3.2.4 Nipomo Supplemental Water
The City has contractual obligations to the Nipomo Community Services District (NCSD) to deliver potable water for NCSD’s use. Table 3‐10 shows the demand commitment as estimated by NCSD.
Table 3‐10. Nipomo Community Services District Supplemental Water Demand Current
(MGD)
5 Year
(MGD)
10 Year
(MGD)
Build-out
(MGD)
City ADD 12.06 12.77 14.16 19.80
NCSD ADD 0.58 1.43 1.79 2.68
Total ADD 12.64 14.20 15.95 22.48
3.2.5 Peak Flows
The future demand estimates, shown in Table 3‐11 below, were input into the model and developed as separate demand data sets for use in analyzing the City’s distribution system under future demand conditions. These demands include the projected 2.68 MGD (3,000 AFY) Buildout demands for the Nipomo Supplemental Water Project as presented in Table 3‐10.
Table 3‐11. Future demand estimates
Current
(MGD)
5 Year
(MGD)
5 year
(gpm)
10 Year
(MGD)
10 year
(gpm)
Build-out
(MGD)
Build-out
(gpm)
Average Day Demand
(ADD) 12.64 14.20 9,858 15.95 11,073 22.48 15,612
Maximum Day
Demand (MDD) 20.19 22.68 15,749 25.35 17,606 35.64 24,749 Peak Hour Demand
(PHD) 29.64 33.30 23,128 37.14 25,790 52.12 36,193
3.3 PRODUCTION EVALUATION
The purpose of the production evaluation is to determine if the City has sufficient water production capacity to supply MDD in the event of a reasonable system failure. A reasonable system failure was determined to be the loss of either the State Water Project (SWP) or one large well, and is defined in greater detail later in this section.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 3‐12 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐12
Table 3‐12. 2010 UWMP Future Water Supply
Water Supply
Sources
Projected Water Supply by Year (acre‐feet | MGD)
2015 2020 2025 2030 2035
Groundwater1 34,392 | 30.7 34,277 | 30.6 34,161 | 30.5 34,161 | 30.5 34,045 | 30.4 State Water
Project2
11,227 | 10.0 11,048 | 9.9 10,870 | 9.7 10,870 | 9.7 10,692 | 9.6 Total 45,619 | 40.7 45,325 | 40.5 45,031 | 40.2 45,031 | 40.2 44,737 | 40.0 1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP. 2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
Groundwater is produced from the City’s seven (7) wells. The capacity of each well ranges from 1,000‐ gpm to 2,500‐gpm, as shown in Table 3‐13. The total production capacity of the existing wells is 14,950‐ gpm. The City is actively expanding the well capacity. In late 2014 Well 5H was connected to the potable water system and upgraded from 600‐gpm capacity to 1,000‐gpm capacity. The City is currently in planning and preliminary design for a new well in Adam Basin rated at 1,000‐gpm to be brought on line in 2015 or 2016.
Table 3‐13. Well Summary
Well Number Capacity (gpm)
6 1,000
9 1,800
10 2,500
11 2,150
12 2,500
13 2,500
14 2,500
2014 In‐service Total 14,950
5H1 1,000
Adam Basin2 1,000
Planned 2015 Total 16,950
1 In late 2014 the City completed an upgrade of well
5H to connect to the potable water system and
increase the well capacity from 600‐gpm to 1,000‐
gpm.
2 The City is in the planning and preliminary design
stages for a new well at Adam Basin planned with a
1,000‐gpm capacity.
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐13
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and Buildout conditions:
(1) Meet Buildout MDD with the largest well out of service and the SWP in service. (2) Meet Buildout MDD with the SWP out of service and all the wells in service.
Table 3‐14 shows the total production capacity available under both criteria.
Table 3‐14. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (all wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service. 2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 3‐15. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before Buildout occurs (see Table 3‐15).
Table 3‐15. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning
Timeframe
MDD
(gpm)
Additional Capacity
Required, Incremental2
(gpm)
Total Well Capacity2
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm). 2 The Utility Capacity Study evaluated capacity of the water system. Evaluation of potential water quality issues associated with establishing new groundwater sources in the City is beyond the scope of this study, and should be performed on an individual case by case basis as the City sites and constructs new wells.
3.4 STORAGE CAPACITY EVALUATION
Possessing sufficient water storage is essential to ensure that water is available to meet peak and emergency water demands in the system.
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐14
3.4.1 Existing Storage
The City has three existing water storage reservoirs: Reservoir No. 4, Reservoir No. 5 and Reservoir No.
6. The total combined usable storage volume is 17.9 million gallons, as shown in Table 3‐16.
Table 3‐16. Existing Storage
Storage Facility
(Date Installed)
Usable Volume1
(Million Gallons)
Material
Reservoir No. 4
(2004)
5.2 Concrete,
Partially Buried
Reservoir No. 5
(1960)
6.2 Concrete,
Partially Buried
Reservoir No. 6
(1982)
6.5 Concrete,
Partially Buried
Total 17.9 1 Excludes “dead space,” which is not used in order to protect reservoir structure; “dead space” is assumed to be 3‐ft of storage which translates to 0.87 MG for Reservoir 4, 0.75 MG for Reservoir 5, and 0.39 MG for Reservoir 6.
3.4.2 Required Storage Calculations
WSC’s analysis of water storage requirements consists of three different components. These components are described below and the results of WSC’s storage analysis are shown in Table 3‐17.
3.4.2.1 Operational Storage
Operational storage is an estimate of the volume of water required for normal operation of the water system; it allows pump cycle times to be optimized and allows the City to meet demand when pumps are in the “off” part of the cycle. The operational storage is calculated as 4 times PHD, minus the reliable well capacity which is assumed to be the total capacity of the wells that can be powered by generators.
3.4.2.2 Fire Flow Storage
Fire flow requirements are generally set by the California Fire Code and can be adjusted by the local fire chief. For this analysis, the fire flow storage requirement is calculated assuming 3,000‐gpm of flow is required for 4 hours, which is equal to 720,000 gallons.
3.4.2.3 Emergency Storage
The emergency storage requirement is calculated as 2 days of ADD, minus the reliable well capacity.
The reliable well capacity is assumed to be the total capacity of the wells that can be powered by generators, as was assumed for Operational Storage (Section 3.4.2.1).
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐15
Table 3‐17 presents the water storage calculations for current and Buildout demands. For Buildout, two cases are presented. Case A represents the Buildout storage requirements if the City does not purchase additional generator sets. The City currently has 3 generator sets, which are capable of powering the three largest wells. With only 3 generator sets, the reliable well capacity is assumed to be 7,500‐gpm, and 31 million gallons of storage will be required at Buildout. As shown in Table 3‐16, the City has 17.9 million gallons of usable storage available, so without additional generators this would result in insufficient shortage at Buildout.
To correct this projected storage deficit the City could build additional storage or increase reliable well capacity. WSC’s recommendation is to increase the reliable well capacity by purchasing additional generators. Table 3‐17 Case B, presents the Buildout storage requirement assuming the City purchases 2 additional generator sets, resulting in a total of 5 generator sets. For Case B, the reliable well capacity is assumed to be 12,150‐gpm (total capacity of the City’s five largest wells), and 16.5 million gallons of storage will be required at Buildout. The City has 17.9 million gallons of storage and will therefore have sufficient storage to meet Buildout requirements.
Table 3‐17. Current and Buildout Storage Requirements
Storage Component Current Case A: Buildout
(3 generator sets)
Case B: Buildout
(5 generator sets)
Operational Storage1 (MG) 3.2 6.9 5.8
Fire Flow Storage2 (MG) 0.7 0.7 0.7
Emergency Storage3 (MG) 2.5 23.4 10.0
Total 6.5 31.0 16.5
1 Calculated as 4 hours of PHD (includes obligations to NCSD) minus existing reliable well capacity that can be powered by generators. For Case A, assumes the three largest wells (Well 12, 13, and 14) are powered be generators since City has three generators. For Case B, assumes the City purchases 2 additional generators (5 total), so Well 10, 11, 12, 13, and 14 can be powered by generators. 2 Assumes fire flow of 3,000 gpm for 4 hours. 3 Calculated as 2 days of ADD (includes obligations to NCSD), minus existing reliable well capacity that can be powered be generators. For Case A, assumes the three largest wells (Well 12, 13, and 14) are powered by generators since City has three generators. For Case B, assumes the City purchases 2 additional generators (5 total), so Well 10, 11, 12, 13, and 14 can be powered be generators.
3.5 HYDRAULIC MODEL DEVELOPMENT
3.5.1 Model Development
Accurately evaluating the City of Santa Maria’s (City) water system infrastructure requires an updated water model that represents the current condition of the City’s water distribution system and the spatially allocated current and future demands. To achieve this, WSC created an updated water model based on the City’s updated Geographic Information Systems (GIS) distribution system mapping in InfoWater®, a GIS based hydraulic modeling software product by Innovyze.
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐16
To develop a water model that accurately represents the current condition of the City’s distribution system, WSC imported the relevant features from the City’s most recent GIS geodatabase into InfoWater. The City’s water system geodatabase is continuously updated by the City to reflect the current layout of the City’s water distribution system.
3.5.1.1 Model Skeletonization
The City possesses a software license from Innovyze that allows for a maximum of 2,000 links (pipe segments) in the water model. At the City’s direction, WSC skeletonized the water model to reduce the number of pipe segments from approximately 14,000 to 1,600. This was achieved by removing smaller diameter pipelines and by consolidating individual pipe segments. Initially, only pipelines with a diameter of greater than or equal to 8” were imported into InfoWater. After importation, nodes were appended to each pipe segment endpoint with a tolerance of 3 feet to create the junction features in the model. WSC then used the Innovyze Skeletonizer extension to consolidate all adjacent pipes with the same diameter and material. Next, all dead‐end pipes with a length less than 200 feet and a diameter less than 20” were removed from the model.
Following the initial skeletonization, City staff reviewed the model piping and identified additional pipelines to be removed (e.g. previously unskeletonized dead‐ends) and pipelines to be added (e.g. 6”diameter pipes that connect isolated sections of the distribution system or created important loops).
The model was then updated to incorporate these final edits. Storage facilities and well features were imported from the previous hydraulic model (Version 2008_Base) and connected to the piping in the updated hydraulic model. Elevation data for each of the junctions in the water model were obtained from a Digital Elevation Model (DEM) developed from the City’s 2‐ft elevation contour shapefile, using the Innovyze Elevation Extractor®.
3.5.2 Spatial Demand Allocation
WSC utilized spatially allocated water demands to load the model for the current and future demand scenarios. To develop estimates of current demands, WSC linked customer consumption records (September 2011‐12) from the City’s billing database to their spatial location in the distribution system.
More information on how the customer records were spatially allocated and how current Average Day Demand (ADD) estimates were developed is contained in Section 3.2 with additional detailed information included in Appendix A.
3.5.3 Water Model Calibration
To perform calibration of the water model, WSC used hydraulic data from the City’s Supervisory Control and Data Acquisition (SCADA) system. The City tracks flow, pressure and tank level at key facilities located throughout its distribution system. The City extracted hourly information from its SCADA system from 11/1/2011 to 11/1/2012 and from 1/23/2013 to 1/31/2013 and provided it to WSC for use in calibrating the water model.
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐17
3.5.3.1 Sensitivity Analysis
Prior to selecting specific friction factors for different pipe materials, a sensitivity analysis was performed to determine if the normal operation of the distribution system, captured in the SCADA data, produced sufficient pressure differences to calibrate the water model. Higher flows cause higher head losses and the change in head relative to flow rate is used to select the appropriate friction factors for a water model. Using data from the SCADA system for July 31, 2012 two scenarios were developed to perform the sensitivity analysis: one with the friction factor for all pipelines set at 60; and one with the friction factors set at 150. The results of the sensitivity analysis indicated that the difference in friction factor resulted in a difference in pressure at the key calibration location of greater than 25 psi. This difference in pressure was determined to be sufficient to establish friction factors for each pipe material in the distribution system and to calibrate the water model. The results of the sensitivity analysis are shown in Table 3‐18 below.
Table 3‐18. Water model sensitivity analysis
Junction Description Junction
ID
Time Observed
Pressure
(psi)
Simulated
Pressure (psi)
Difference
(psi)
C = 60 C = 150
Well_14_Pressure J1254 6:00:00 90.0 89.5 88.5 1.0
Well_14_Pressure J1254 12:00:00 95.0 99.4 93.7 5.7
Well_14_Pressure J1254 18:00:00 95.0 98.9 94.2 4.7
Well_14_Pressure J1254 24:00:00 95.0 98.9 94.0 4.9
Well_14_Pressure J1254 30:00:00 93.0 89.3 88.4 1.0
Well_9_Pressure J1894 6:00:00 75.0 80.5 79.5 1.0
Well_9_Pressure J1894 12:00:00 79.0 90.4 84.7 5.7
Well_9_Pressure J1894 18:00:00 79.0 89.9 85.2 4.7
Well_9_Pressure J1894 24:00:00 79.0 89.9 85.0 4.9
Well_9_Pressure J1894 30:00:00 77.0 80.4 79.4 1.0
Well_11_Pressure J3436 6:00:00 74.0 79.5 78.5 1.0
Well_11_Pressure J3436 12:00:00 79.0 89.4 83.7 5.7
Well_11_Pressure J3436 18:00:00 79.0 88.9 84.2 4.7
Well_11_Pressure J3436 24:00:00 79.0 88.9 84.0 4.9
Well_11_Pressure J3436 30:00:00 78.0 79.4 78.4 1.0
Donovan_Pressure J390 6:00:00 72.2 47.5 73.5 -26.0
Donovan_Pressure J390 12:00:00 79.8 72.1 81.3 -9.3
Donovan_Pressure J390 18:00:00 79.4 66.9 81.0 -14.1
Donovan_Pressure J390 24:00:00 78.9 68.3 81.0 -12.7
Donovan_Pressure J390 30:00:00 72.6 47.4 73.3 -26.0
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐18
3.5.3.2 Model Calibration
WSC selected two 24‐hr time periods to utilize for calibrating the City water model: July 31‐August 1st, 2012 and January 24‐25th, 2013. The July time period was selected to represent a time of high demands and higher head loss in the distribution system and the January time period was selected to represent lower demand periods and to take advantage of additional hydrant pressure data.
To perform the calibration, the model was initially loaded using the spatially allocated current ADD demands described in Spatial Demand Allocation. These demands were then adjusted (increased uniformly by a multiplier of 1.28 for July and decreased by a multiplier of 0.67 for January) to match the observed demands for each calibration period. A diurnal demand curve was then applied to the adjusted spatially allocated demands to vary demands throughout the day. To develop the diurnal demand curve, hourly demands were estimated using a mass balance equation that included inflow to the distribution system (i.e. turnouts and well flows) and change in storage (i.e. tank levels). Additional information on the diurnal demand curves is provided later in this chapter.
Once the model was loaded with demands, controls were applied to the flow control valves and wells in the distribution system to mimic the operation of the distribution system during the calibration period.
WSC then used the InfoWater Calibrator tool to select Hazen‐Williams friction factors for the pipelines in the model to mimic the system pressures recorded by the SCADA system. Using the two scenarios, WSC selected C‐factors for each pipe material that allowed the model to accurately represent the hydraulic conditions observed during the two calibration periods. The C‐factors selected, shown in Table 3‐19 below, were within the range of values identified in a common engineering reference manual (4).
Table 3‐19. Water model friction factors
Material Material
Abbreviation
C-Factor
Polyvinyl Chloride PVC 150
Asbestos Cement Pipe ACP 130
Cast Iron Pipe CIP 100
Cement Coated & Cement Lined CC & CL 130
Cement Mortar Lined Steel CMLS 130
Ductile Iron DI 105
High Density Polyethylene HDPE 130
Cement Lined Steel CLS 130
The results of the calibration are shown in Table 3‐20, Figure 3‐3, and Figure 3‐4 below. Of the forty‐five (45) measurements used for calibration thirty‐four (34) were within the desired range of 5 psi of the observed value (5). The outlying values were within 6.5 psi of the observed values.
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐19
Table 3‐20. July 31, 2012 Calibration results
Junction
Description
Junction
ID
Time Observed
Pressure
(psi)
Simulated
Pressure
(psi)
Difference
(psi)
Well_14_Pressure J1254 6:00:00 90.0 88.96 1.04
Well_14_Pressure J1254 12:00:00 95.0 93.16 1.84
Well_14_Pressure J1254 18:00:00 95.0 93.12 1.88
Well_14_Pressure J1254 24:00:00 95.0 93.07 1.93
Well_14_Pressure J1254 30:00:00 93.0 89.19 3.81
Well_9_Pressure J1894 6:00:00 75.0 79.98 -4.98
Well_9_Pressure J1894 12:00:00 79.0 84.18 -5.18
Well_9_Pressure J1894 18:00:00 79.0 84.14 -5.14
Well_9_Pressure J1894 24:00:00 79.0 84.09 -5.09
Well_9_Pressure J1894 30:00:00 77.0 80.22 -3.22
Well_11_Pressure J3436 6:00:00 74.0 79.01 -5.01
Well_11_Pressure J3436 12:00:00 79.0 83.21 -4.21
Well_11_Pressure J3436 18:00:00 79.0 83.16 -4.16
Well_11_Pressure J3436 24:00:00 79.0 83.12 -4.12
Well_11_Pressure J3436 30:00:00 78.0 79.24 -1.24
Donovan_Pressure J390 6:00:00 72.2 75.95 -3.75
Donovan_Pressure J390 12:00:00 79.8 79.74 0.06
Donovan_Pressure J390 18:00:00 79.4 79.69 -0.29
Donovan_Pressure J390 24:00:00 78.9 79.65 -0.75
Donovan_Pressure J390 30:00:00 72.6 76.19 -3.59
Figure 3‐3. July 31, 2012 Calibration results
70.0 75.0
80.0 85.0
90.0 95.0
100.0
105.0
110.0
70.0 80.0 90.0 100.0 110.0
Simulated Pressure (psi)
Observed Pressure (psi)
Well_14_Pressure
Well_11_Pressure
Well_9_Pressure
Donovan_Pressur
e
Y = X
Y=X+5
Y=X‐5
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐20
Table 3‐21. January 24, 2013 Calibration results
Junction Description Junction
ID
Time Observed
Pressure
(psi)
Simulated
Pressure
(psi)
Difference
(psi)
Well_14_Pressure J1254 17:00:00 94.0 91.44 2.56
Well_14_Pressure J1254 23:00:00 95.0 91.29 3.71
Well_14_Pressure J1254 29:00:00 94.0 91.01 2.99
Well_14_Pressure J1254 35:00:00 94.0 91.32 2.68
Well_14_Pressure J1254 41:00:00 95.0 91.33 3.67
Well_9_Pressure J1894 17:00:00 78.0 82.46 -4.46
Well_9_Pressure J1894 23:00:00 79.0 82.32 -3.32
Well_9_Pressure J1894 29:00:00 79.0 82.04 -3.04
Well_9_Pressure J1894 35:00:00 78.0 82.34 -4.34
Well_9_Pressure J1894 41:00:00 79.0 82.35 -3.35
W_Stowell_Pressure J2522 17:00:00 100.8 104.67 -3.87
W_Stowell_Pressure J2522 23:00:00 103.8 104.52 -0.72
W_Stowell_Pressure J2522 29:00:00 102.6 104.24 -1.64
W_Stowell_Pressure J2522 35:00:00 101.3 104.38 -3.08
W_Stowell_Pressure J2522 41:00:00 104.2 104.56 -0.36
Well_11_Pressure J3436 17:00:00 78.0 81.49 -3.49
Well_11_Pressure J3436 23:00:00 80.0 81.34 -1.34
Well_11_Pressure J3436 29:00:00 80.0 81.06 -1.06
Well_11_Pressure J3436 35:00:00 78.0 81.37 -3.37
Well_11_Pressure J3436 41:00:00 80.0 81.37 -1.37
Donovan_Pressure J390 17:00:00 79.7 81.23 -1.53
Donovan_Pressure J390 23:00:00 84.3 81.08 3.22
Donovan_Pressure J390 29:00:00 83.9 80.80 3.1
Donovan_Pressure J390 35:00:00 80.3 80.92 -0.62
Donovan_Pressure J390 41:00:00 83.2 81.11 2.09
Figure 3‐4. January 24, 2013 calibration results
70.0 75.0
80.0 85.0
90.0 95.0
100.0
105.0
110.0
70.0 80.0 90.0 100.0 110.0
Simulated Pressure (psi)
Observed Pressure (psi)
Well_14_Pressure
Well_11_Pressure
Well_9_Pressure
Donovan_Pressure
W_Stowell_Pressure
Y = X
Y=X+5
Y=X‐5
City of Santa Maria 3. Water System Evaluation Utilities Capacity Study
3‐21
3.5.3.3 Diurnal Demand Curves
To develop a demand curve that would allow the model to mimic varying diurnal demands throughout the year, WSC combined the temporal demands calculated from the January and July SCADA data.
Shown below in Figure 3‐5 are the diurnal demand curves used for July 31, 2012, January 24, 2013 and the combined average demand curve. The average demand curve was incorporated into the model to allow for Extended Period Simulation model runs.
Figure 3‐5. Diurnal demand curves
3.6 WATER DISTRIBUTION SYSTEM CONDITION EVALUATION
The City has three pipeline segments with high incidents of breaks and/or leaks that have been identified for replacement. The pipeline segments are included in the recommended capital projects list.
3.7 WATER DISTRIBUTION SYSTEM CAPACITY EVALUATION
WSC used the calibrated hydraulic model to evaluate system pressures and available fire flow for the existing water system and again for the existing water system with Buildout loads, and found the distribution system was capable of meeting the City’s pressure requirements during existing and Buildout PHD and the system was capable of meeting the minimum fire flow requirements during existing and future MDD. No capacity related pipeline improvements are recommended. 0 0.2
0.4 0.6
0.8 1
1.2 1.4
1.6 1.8
0:00 6:00 12:00 18:00 0:00
Ratio to Total Demand
Time
January 24, 2013
July 31, 2012
Average Diurnal
City of Santa Maria 4. Recommended Water Distribution System Capital Improvements Utilities Capacity Study
4‐1
4 RECOMMENDED WATER DISTRIBUTION SYSTEM CAPITAL
IMPROVEMENTS
4.1 PROJECT PRIORITIZATION
The water system project recommendations address improvements to source of supply, production and distribution facilities. The projects have been divided into three groups, Priority A, B, and C, where Priority A projects have the highest priority. In general, Priority A projects are needed to comply with current or anticipated future regulations, correct recurring failures, address significant safety concerns (including correcting fire flow that is well under the required flow), or ensure that adequate water supplies are available to meet projected demands at the 0‐5 year planning stage. Priority B projects address longer‐term needs (5‐10 year planning horizon), often related to future growth or improvements that enhance system reliability or other low‐level risks. Priority C projects include the recommended projects to meet demands for the 10 year to Buildout planning scenario.
4.2 COST OPINION BASIS AND ASSUMPTIONS
The cost opinions (estimates) included in this CIP are based upon the Class 4 Conceptual Report Classification of Opinion of Probable Construction Cost as developed by the Association for the Advancement of Cost Engineering (AACE) Cost Estimate Classification System. The purpose of a Class 4 Estimate is to provide a conceptual level effort that has an expected accuracy range from ‐30% to +50% and the inclusion of an appropriate contingency for planning and feasibility studies. The conceptual nature of the design concepts and associated costs presented in this CIP are based upon limited design information available at this stage of the projects. These cost estimates have been developed using a combination of data from RS Means CostWorks®, recent bids, experience with similar projects, current and foreseeable regulatory requirements and an understanding of the necessary project components.
As the projects progress, the design and associated costs could vary significantly from the project components identified in this CIP.
The recommended projects and these cost opinions are based on the following assumptions:
1. For projects where applicable cost data is available in RS Means CostWorks® (e.g. pipeline installation), cost data released in Quarter 1 of 2014, adjusted for the Central Coast, is used.
Material prices were further adjusted in some cases to provide estimates that align closer with actual local bid results.
2. For projects where RS Means CostWorks® data is not available, cost opinions are generally derived from bid prices from similar projects, vendor quotes, material prices, and labor estimates, with adjustments for inflation, size, complexity and location.
3. Cost opinions are in 2014 dollars (ENR Construction Cost Index of: 9701.96 for March 2014).
When budgeting for future years, appropriate escalation factors should be applied. The past 5 year average increase of the ENR CCI 20 City Average is considered a reasonable factor to use for escalation.
4. Cost opinions are “planning‐level” and may not fully account for site‐specific conditions that will affect the actual costs, such as soil conditions and utility conflicts.
City of Santa Maria 4. Recommended Water Distribution System Capital Improvements Utilities Capacity Study
4‐2
5. Construction Costs include the following mark‐up items:
a. 5% of construction item sub‐total to account for unknown items not included in the opinion of cost.
b. 15% construction contingency based on construction sub‐total.
6. Total Project Costs include the following allowances:
a. 15% of Construction Total for project development, including administration, alternatives analysis, planning, engineering, surveying, etc. b. 10% of Construction Total for construction phase support services, including administration, inspection, materials testing, office engineering, construction administration, etc.
4.3 RECOMMENDED WATER SYSTEM CAPITAL PROJECTS
Detailed project descriptions, which include scope, capacity, alternatives, and estimated project duration and cost are included in Appendix D. Plate 1 enclosed with the study, shows a large scale map of the distribution system and the phased improvements.
Table 4‐1. Recommended Water System Capital Projects
Note: Project A2 is in progress as the City has converted well 5H to the potable water system and upgraded it to 1,000‐gpm and are in the planning and preliminary design phase of a new 1,000‐gpm well in Adam Basin.
4.4 PROJECT SHEETS
Detailed project sheets describing the recommended projects can be found in Appendix D.
Priority
Group
Priority
No. Description TotalLength (ft)
New
Diam
Old
Diam
Total Project
Cost
A 1N Broadway Water Main Upgrade 2,367 88 $ 622,000 A 2 2,000 gpm Potable Well $ 3,443,000
Group A subtotal $ 4,065,000
B 1 2,000 gpm Potable Well $ 3,443,000
B 2 Standby Generator for Existing Well $ 450,000 B 3 South Airport Water Main Upgrade 2,850 88 $ 543,000 B 4N McClelland Street Water Main Upgrade 2,720 12 12 $ 967,000 Group B subtotal $ 5,403,000
C 1 2,000 gpm Potable Well $ 3,443,000
C 2 2,000 gpm Potable Well $ 3,443,000
C 3 2,000 gpm Potable Well $ 3,443,000
C 4 Standby Generator for Existing Well $ 450,000 Group C subtotal $ 10,779,000
Total of All Groups 20,247,000 $
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐1
5 WASTEWATER COLLECTION SYSTEM EVALUATION
This Chapter describes WSC’s development of a sewer system hydraulic model for the City of Santa Maria (City), based on the City’s current Geographic Information System (GIS) mapping data.
5.1 SEWER SYSTEM DESIGN CRITERIA
In planning the needed sewer facilities, accepted engineering standards and practices are utilized to evaluate facilities. The evaluation criteria for the sewer system have been organized into four categories: Customer and Flow Projections (Table 5‐1), Gravity Pipelines (Table 5‐2), Force Mains (Table 5‐3), and Lift Stations (Table 5‐4). The specific criteria included in each of the categories are shown in the following tables.
Table 5‐1. Sewer System Planning and Evaluation Criteria: Customer and Flow Projections Purpose Regulation or Reference Engineering and Planning Criteria Future System Flows City’s General Plan Housing
Element
Calculate wastewater flows at Buildout
from:
(1) Buildout land use from City’s
General Plan Housing Element;
and
(2) Wastewater duty factors by land
use type
(3) Adjust using per capita and
neighborhood data
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐2
Table 5‐2. Sewer System Planning and Evaluation Criteria: Gravity Pipelines Purpose Regulation or Reference Engineering and Planning Criteria Pipe Velocities Recommended Standards for
Wastewater Facilities1; Civil
Engineering Reference Manual2
Maintain minimum velocity of 2 fps
at Average Annual Daily Flow (AAF)
and a maximum velocity of 10 fps at
Peak Hour Wet Weather Flow
(PHWWF)
d/D Survey of utility sewer design
standards; Engineer’s Judgment
Maximum d/D at PHWWF:
0.60 for pipes with diameter 10” or
less
0.75 for pipes with diameter greater
than 10”
Minimum Slope Engineering Calculations (using
Manning’s Equation to meet 2 fps
pipe velocity at half full flow)
The sewer must be designed with a
slope to be able to serve its entire
tributary area. The preferred
minimum slope for gravity sewers is
0.005. When conditions require,
flatter slopes may be approved in
accordance with following:
The minimum slope for an 8” sewer is
0.004;
The minimum slope for a 10” sewer is
0.0028;
The minimum slope for a 12” sewer is
0.0022;
The minimum slope for a 15” sewer is
0.0017.
New Sewer Mains Engineer’s Judgment New sewer mains will be 6” or greater in residential areas and 8” or
greater in all other areas. 1Recommended Standards for Wastewater Facilities (Ten State Standards). Wastewater Committee of the Great Lakes‐Upper Mississippi River Board of State and Provincial Public Health and Environmental Managers. Albany: Health Research, Inc., 2004.
2 Lindeburg, Michael R. Civil Engineering Reference Manual for the PE Exam 8th ed. Belmont: Professional Publications, Inc., 2001. ISBN 1‐888577‐66‐5.
Table 5‐3. Sewer System Planning and Evaluation Criteria: Force Mains Purpose Regulation or Reference Engineering and Planning Criteria Pipe Velocities Pumping Station Design1 Design new mains to operate at velocity of 3 to 4 fps; Maintain velocity as close
to 3 fps as possible for existing mains 1 Jones, Garr M. Editor‐in‐Chief. Pumping Station Design Revised 3rd ed. Burlington: Elsevier, Inc., 2008. ISBN 978‐1‐85617‐ 513‐5.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐3
Table 5‐4. Sewer System Planning and Evaluation Criteria: Lift Stations Purpose Regulation or Reference Engineering and Planning Criteria Pump Capacity Accepted Engineering
Practice
Capacity should be sufficient to meet
PHWWF, with one pump available as a
back up
Wet Well Size Unified Facilities Criteria1 Keep retention times less than 30 minutes unless odor control chemicals
are added; Keep the number of pump
starts per hour below manufacturer
specifications 1Department of Defense. Unified Facilities Criteria (UFC), Wastewater Collection and Pumping, 2004. UFC 3‐240‐06A.
5.2 DEVELOPING EXISTING AND FUTURE SEWAGE FLOWS
The section presents the methodology and results of the sewage flow analysis performed in analysis of the City’s sewer collection system. The basic methodology uses the spatially allocated water demands as discussed in Chapter 3 and Appendix A. The existing spatially allocated water demands were then converted to indoor water use which represents sewage flow and the resulting spatially allocated sewage flow was then calibrated to field collected sewer flow monitoring data.
5.2.1 Sewer Flow Monitoring
To obtain data on actual existing baseline and peak sewer flows, WSC subcontracted Fluid Resource Management (FRM) to install flow monitors at six (6) locations in the City’s collection system. The flow monitoring period began on January 4th, 2013 and ended on March 26th, 2013. FRM used Greyline Stingray meters to measure the depth of flow and the velocity of the sewage flowing in the pipelines.
The flow meters were set to record flow information at five (5) minute intervals. Prior to analyzing the flow data, a “Zero Filter” of 30 minutes was applied to remove any anomalous zero level readings. Once filtered, the depth and velocity data was combined with the pipe diameters for each of the flow monitoring locations to calculate flow rate in the pipelines.
The flow monitoring locations were carefully selected to provide a dataset that allowed evaluation of baseline and peaking flows for three main geographic areas and for the collection system as a whole. An overview map of the sewer flow monitoring locations can be seen in Figure 5‐1. More detailed maps of the flow metering locations are contained in Appendix B.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐4
Figure 5‐1. Sewer flow monitoring locations
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐5
The results from the flow monitoring study are summarized in Table 5‐5 and Figure 5‐2. As shown in Table 5‐5, the total average flow was calculated to be 8.15 MGD based on the flow monitoring results; this compares closely with the average annual flow (AAF) for the wastewater treatment plant (WWTP) of 8.07 MGD for the period of January 2009 through July 2012.
Table 5‐5. Flow monitoring results1
Flow Monitor
Location
Average Daily
Flow Rate1
(gpm)
Average
Daily Flow
Rate (MGD)
Peak Hour
Flow Rate2
(gpm)
Peak Hour
Flow Rate
(MGD)
No. 1 N Blosser Rd 1,122 1.62 1,911 2.75
No. 2 At Plant 3,360 4.84 5,690 8.19
No. 3 W Stowell Rd 2,300 3.31 3,934 5.66
No. 4 A St 806 1.16 1,641 2.36
No. 6 W Knudsen
Way
563 0.81 1,132 1.63
1 Monitoring period (January 4, 2013 to March 26, 2013) 2 Average Daily Flow Rate (ADF) equals average flow rate for the monitoring period 3 Peak Hour Flow Rate (PHF) equals peak hour flow rate for the monitoring period The flow monitoring data was used to determine the PHWWF peaking factor for the collection system, which is discussed in 5.2.25.2.2, and to evaluate inflow and infiltration (I/I), which is discussed below.
5.2.1.1 Inflow and Infiltration (I/I)
Infiltration is the water entering a sewer system and service connections from groundwater, through such means as defective pipes, pipe joints, connections, or manhole walls. Infiltration does not include inflow and is typically relatively constant over a period of days, weeks, or even months as high groundwater conditions persist. Infiltration rates can be estimated by comparing average wet weather flow (AWWF) to average annual flow (AAF). On a system wide basis it does not appear that the City suffers from a major infiltration problem because the AWWF (defined as the average daily flow experienced in December, January, February, and March, historically wet weather months) is 7.78 MGD compared to an AAF of 8.19 MGD for the same 2007 through 2011 period. The higher AAF than AWWF is attributed the operation of agricultural packaging plants during the growing season.
Inflow is the water discharged into a sewer system and service connections from such sources as roof drains, cellar, yard and area drains, foundation drains, cooling water discharges, drains from springs and swampy areas, manhole covers, cross connections from storm sewers, catch basins, storm water, surface runoff, or drainage. Inflow does not include infiltration. Inflow varies rapidly with rainfall conditions, with flows rising and falling within minutes or hours of a severe storm event. Inflow rates can be estimated by comparing PWWF and PDWF. Using the available data from the flow monitoring, the PWWF is 13.86 MGD compared to a PDWF of 12.96 MGD or approximately a 7% increase.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐6
5.2.1.1.1 Additional I/I Study
City staff expressed a concern that the sewer collection system in the southeastern portion of the service area may experience infiltration from groundwater. However, WSC’s analysis of the sewer flow monitoring data collected for that area identified only a 2.8% or 23 gpm increase in the flows rate during the days following a rainfall event. While this does not indicate a significant infiltration contribution, it is possible that there is a baseline infiltration that could not be detected with the limited amount of data, the significant distance between the flow monitor and the suspected area or that wetter hydrologic conditions and associated groundwater levels are necessary for infiltration to occur. It is recommended that the City perform additional flow monitoring for the suspected area to obtain more definitive data.
According to the flow monitoring data collected, rainfall events that occurred during the monitoring period did not appear to have a significant impact on the sewage flow rates in the City’s sewer collection system. Conversations with City staff confirmed that the City does not typically observe a significant correlation between rainfall and increased WWTP flows. However, analysis of historical rainfall data from the Sisquoc CIMIS station indicated that the maximum daily rainfall recorded since 2000 was 3.8 in/day. The maximum observed rainfall during the flow monitoring period was 0.48 in/day. It is likely that increased rainfall could cause increased I/I flows on the collection system. The City could perform additional study if the apparent I/I observed at the WWTP increases to a level of concern.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐7
Figure 5‐2. Flow monitoring summary graph
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐8
5.2.2 Peaking Factors
WSC utilized the flow monitoring data, combined with theoretical methods, to determine an appropriate peaking factor for the City’s sewer collection system. WSC first calculated peaking factors using the average and peak hour flow rates measured by the flow monitors (see 5.2), which are shown in Table 5‐6. The calculated peak hour flow factors using the measured flow data ranged from 1.70 to
2.04. Table 5‐6. Calculated Peak Hour Flow Factors1
Flow Monitor
Location
Average Daily
Flow Rate2
(gpm)
Average
Daily Flow
Rate (MGD)
Peak Hour
Flow Rate3
(gpm)
Peak Hour
Flow Rate
(MGD)
Calculated
Peak Hour
Flow
Factor
No. 1 N Blosser Rd 1,122 1.62 1,911 2.75 1.70
No. 2 At Plant 3,360 4.84 5,690 8.19 1.69
No. 3 W Stowell Rd 2,300 3.31 3,934 5.66 1.71
No. 4 A St 806 1.16 1,641 2.36 2.04
No. 6 W Knudsen
Way 563 0.81 1,132 1.63 2.01
1 Monitoring period (January 4, 2013 to March 26, 2013) 2 Average Daily Flow Rate (ADF) equals average flow rate for the monitoring period 3 Peak Hour Flow Rate (PHF) equals peak hour flow rate for the monitoring period WSC then used three theoretical methods that determine sewer peaking factor based on population to assist with the selection of the Peak Hour Flow Factor for the City’s collection system. The calculated peaking factors using each method are shown in Table 5‐7, additional details on the equations can be found in Appendix C.
Table 5‐7. Calculated peaking factors using population
Method Peaking Factor1
Babbitt 1.99
Harmon 2.00
Ten States Standard 2.00
1 Calculated based on a population of 100,277
Based on the calculated peaking factors shown in Table 5‐6 and Table 5‐7, WSC selected a Peak Hour Wet Weather Flow Factor of 2.0. The peaking factor was used to develop peak flow rates for the City collection system. As observed and verified by calculations, this is an appropriate peaking factor for a system of this size that does not have significant I/I.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐9
5.2.3 Current Sewer Flow Allocation
WSC utilized the spatially allocated customer water consumption records developed for the water model as the basis for developing the spatially allocated sewer flows. Additional information on how the spatially allocated water customer consumption data was developed is contained in Appendix A. To convert consumption to sewer flows, water‐to‐sewer factors (i.e. percentage of water that goes to the sewer) were then applied to the customer water consumption records to allow the model to mimic observed flow conditions. The methodology for developing the water‐to‐sewer factors is described below and the results are summarized in Table 5‐9 and shown in Figure 5‐3 .
5.2.3.1 Water‐to‐Sewer Factors
To develop the water‐to‐sewer factors, WSC analyzed the relationship between the water consumed and the amount of sewage generated for each zoning type in the City collection system by comparing the landscape irrigation and domestic water demand for those customers that had landscape irrigation meters. Assuming that all water from the domestic meters was discharged to the sewer system and all landscape irrigation demands were not, WSC developed initial water‐to‐sewer factors for each zoning type within the City’s service areas.
These water‐to‐sewer factors were then compared to reference values from neighboring municipalities.
Water‐to‐sewer factors developed for the City of Paso Robles Wastewater Collection System Study (2007) and the City of San Luis Obispo Water Use Factors Report (1999) were used to establish a range of expected water‐to‐sewer factors for each zoning type.
Once developed and validated, WSC then applied the initial water‐to‐sewer factors to the total water consumption for each zoning type. The water‐to‐sewer factors were then adjusted until the total estimated sewer flow calculated aligned closely with the measured AAF for the collection system. Table 5‐8 shows the correlation between the observed flows in the collection system and the model for the three key sub‐basin areas and the entire collection system.
Table 5‐8. Sewer Model Calibration
Modeled
Flow Rate
(gpd)
Observed
Flow Rate
(gpd)
Difference
(gpd)
Percent
Difference
Blosser Area 1,579,976 1,616,280 (36,304) ‐2.3%
Central Area 5,443,692 5,373,613 70,079 1.3%
McCoy Area 1,271,242 1,161,013 110,230 8.7%
Entire City
Collection
System
8,294,910 8,150,906 144,004 1.7%
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐10
5.2.3.2 Sewer Service Area Flow Adjustments
Because of the differences between the City’s water and sewer service area and other factors affecting sewer flow in the collection system, the following adjustment were made to the customer consumption record data and the spatially allocated sewer flows.
5.2.3.2.1 Sewer Only Customers
In the southeastern portion of the City, there are customers that only receive sewer service from the City; water is provided by Golden State Water. To project the potential sewer loading for this portion of the collection system, the parcel area and land use for each of these customers was used to calculate their estimated water consumption. This spatially allocated consumption was then added to the customer consumption record dataset.
5.2.3.2.2 Laguna Sanitation District Swap
In the southwestern portion of the City, there are customers that receive water from the City, but their sewer service is provided by Laguna County Sanitation District (LCSD). For the purposes of developing the loading for the sewer model, the water consumption from these customers was removed from the customer consumption record dataset.
Additionally, there are LCSD customers whose sewage is collected by the LCSD but ultimately flows to the City’s collection system. The flow from these customers is metered and tracked as part of the City/LCSD sewer swap. For the purposes of developing the spatially allocated loading for the model, two point nodes, loaded with the observed flow data from the City/LCSD swap meters, were developed at the locations where LCSD flows enter the City’s collection system.
Finally, there are City customers that receive City water but their sewer flow is collected by LCSD mains that ultimately flow to the City’s collection system. The spatially allocated sewer flows for these customers were moved so that they are allocated to the location where the LCSD sewer mains connect to the City’s collection system.
5.2.3.2.3 Dedicated Landscape Irrigation Meter Accounts Demands from dedicated landscape irrigation meters were removed from the customer consumption dataset. Additionally, for parcels with dedicated landscape irrigation meters, sewer flow generation was assumed to be equal to the customer water demand and water‐to‐sewer factors were not applied.
5.2.3.3 Zoning Flow Factors
Utilizing the spatially allocated sewer flows, WSC calculated zoning flow factors (gpd/acre) for each zoning type by intersecting the spatially allocated sewer flows with the underlying parcels and their associated zoning. The calculated zoning flow factors for the City collection system are shown in Table 5‐9.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐11
Table 5‐9. Current sewer flows by zoning and zoning flow factors1 Zoning
Code Zoning Code Description Acres
Water
Consump‐
tion (gpd)
Water‐
to‐Sewer
Factor
(%)
Current
Estimated
AAF(gpd)
Estimated
Zoning Flow
Factor
(gpd/acre)
Residential
R‐1 Single‐Family Residential District 2,120 4,433,976 76% 3,369,822 1,900 R‐2 Medium‐Density Residential District 306 746,326 92% 686,620 2,600 R‐3 High‐Density Residential District 284 1,284,548 92% 1,181,784 4,400 RA Residential Agricultural District
RMH Residential Mobile Home Park District 117 190,150 85% 161,628 1,600 RSL‐1 Residential Small Lot District 160 446,738 88% 393,130 2,800 Commercial
C‐1 Central Business District 44 76,933 80% 61,547 1,000 C‐2 General Business District 282 556,071 80% 444,857 1,200 CC Convenience Center District 8 11,224 80% 8,979 1,800 CPO Commercial Office and Professional
Office District 74 141,831 80% 113,465 800
HC Highway Commercial 80%
FS Freeway Service District 25 49,352 80% 39,481 800 Industrial
CM Commercial and Manufacturing District 265 220,586 44% 97,058 400 M‐1 Light Manufacturing District 156 106,353 51% 54,240 400 M‐2 General Manufacturing District 75 33,791 50% 16,896 400 Other
AA Airport Approach Zone Combining
Regulations
AS‐I Airport Service I Zone
AS‐II Airport Service II Zone 1,412 318 53% 168 1
AS‐III Airport Service III Zone
CZ Clear Zone
OS Open Space District 166 186,740 10% 18,674 120
PD Planned Development Overlay District
PF Public Facilities and Institutional District 252 232,438 49% 113,895 600 SP Specific Plan Zoning District 120 452,255 50% 226,128 2,000
LCSD LCSD Metered Loads2 11 140,978
Landscape
Irrigation
Domestic water for Parcels with
Landscape Irrigation Meters 943 783,281 100% 783,281
Industrial
Billed Industrial Billed3 128 382,281
Infiltration
Allowance Assumed infiltration in the zone 0
Total 6,948 9,952,912 8,294,910 1 The spatially allocated customer consumption records were not scaled to historical production data because billed unmetered or non‐revenue water lost in the distribution should not be entering the sewer collection system. 2 Flow measured by City/LCSD swap meter 3 Flow is measured by City flow meters City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐12
Figure 5‐3. Spatially Allocated Sewer Flows
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐13
5.2.4 Future Sewer Flow Allocation
To estimate flow from future development, WSC applied the zoning flow factors shown in Table 5‐9 to underutilized or vacant land within each Transportation Analysis Zone (TAZ). The future growth areas for each TAZ were categorized into 5 year, 10 year, and build‐out time frames, as described in the Water Model chapter. In order to more precisely estimate future sewer flows in the City’s Downtown Specific Plan Area, the City provided WSC with a detailed map of the area showing the exact locations of future development and densification areas within each of the TAZs in the downtown area. The projected build‐out sewer flows for the whole City are shown in Figure 5‐4 and the Downtown Specific Plan Area sewer flows are shown in Figure 5‐5. The projected sewer flows by zoning type for each timeframe increment and the total cumulative sewer flows are shown in Table 5‐10.
5.2.5 Buildout Sewer Flow Routing
The map in Appendix G depicts the anticipated increase in flow for each pipeline in the sewer collection system at Buildout. The map is shows areas of growth and the pipelines that will potentially be impacted by the anticipated growth.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐14
Figure 5‐4. Projected build‐out sewer flows
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐15
Figure 5‐5. Projected build‐out sewer loads for Downtown Specific Plan Area City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐16
Table 5‐10. Future sewer flows by zoning
Acreage AAF (mgd)
Incremental
Projected
Acreage
Incremental
Projected
AAF (gpd)
Incremental
Projected
Acreage
Incremental
Projected
AAF (gpd)
Incremental
Projected
Acreage
Incremental
Projected
AAF (gpd)
R‐1 Single‐Family Residential District 1,900 2,120 3,458,501 113 213,940 150 284,266 246 467,946 R‐2 Medium‐Density Residential District 2,600 306 709,009 25 66,144 50 130,776 544 1,415,269 R‐3 High‐Density Residential District 4,400 284 1,220,320 34 150,684 63 274,499 305 1,339,300 RA Residential Agricultural DistrictRMH Residential Mobile Home Park District 1,600 117 161,628 RSL‐1 Residential Small Lot District 2,800 160 393,130 0 64 178,704 64 178,704 C‐1 Central Business District 1,000 44 44,621 0 0 1 1,100 C‐2 General Business District 1,200 282 272,475 42 26,510 177 187,935 486 559,410 CC Convenience Center District 1,800 8 5,612 0 33 58,997 38 68,447 CPO
Commercial Office and Professional Office
District 800 74 51,059 5 4,000 8 6,678 134 106,885
HC Highway Commercial
FS Freeway Service District 800 25 18,754 5 3,736 11 8,536 11 8,536 CM Commercial and Manufacturing District 400 265 97,058 2 781 108 43,317 321 128,244 M‐1 Light Manufacturing District 400 156 54,240 8 3,159 69 27,400 647 258,950 M‐2 General Manufacturing District 400 75 16,896 4 1,446 34 13,486 189 75,579 AA Airport Approach Zone Combining Regulations
AS‐I Airport Service I Zone
AS‐II Airport Service II Zone 1 1,412 168 0 0 573 573AS‐III Airport Service III ZoneCZ Clear ZoneOS Open Space District 120 166 18,674 PD Planned Development Overlay District
PF Public Facilities and Institutional District 600 252 113,895 63 37,642 167 100,156 304 182,411 SP Specific Plan Zoning District 2,000 120 226,128
LCSD LCSD Metered Loads 11 140,978LandscapeIrrigation
Domestic water for Parcels with Landscape
Irrigation Meters 943 783,281
IndustrialBilled Industrial Billed 128 382,281
6,948 8,168,708 300 508,042 932 1,314,750 3,863 4,791,354 n/a n/a 7,248 8,676,750 8,181 9,991,499 12,043 14,782,853 10‐Year Build‐out
Cumulative Total
Total
Current
ResidentialCommercialIndustrialOther
Zoning
Code Zoning Code Description
Estimated
Zoning Flow
Factor
(gpd/acre)
5‐Year
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐17
5.2.5 Flow Summary
Table 5‐11 provides a summary of the estimated AAF and PHWWF (using a peaking factor of 2.0) for the City’s collection system for the current and future conditions.
Table 5‐11. Summary of flow estimates
Current
(MGD)
5-Year
(MGD)
10-Year
(MGD)
Build-out
(MGD)
Average Annual Flow (AAF) 8.17 8.68 9.99 14.78
Peak Hour Wet Weather Flow (PHWWF) 16.34 17.35 19.98 29.57
5.3 SEWER MODEL DEVELOPMENT
To develop a hydraulic model that accurately represents the current configuration of the City’s collection system, WSC imported the relevant features from the City’s GIS geodatabase into SewerGEMS. The City’s sewer system geodatabase is continuously updated by the City to reflect the current layout of the City’s sewer collection system. WSC identified numerous sewer mains with inaccurate slope information, and provided that data to the City. Upon identification of the segments, the City researched record drawings and other supporting information and surveyed manholes to obtain more accurate elevation data for the collection system pipelines. The updated elevation attribute data was used in the development of the sewer model.
5.3.1.1 Model Review
During the development of the model, WSC reviewed the pipeline features from the City’s GIS to identify elements in the GIS to be excluded from the model (e.g. private sewer pipes, dead‐end pipes, etc.). The edited GIS pipeline shapefile was then imported into SewerGEMS using Bentley’s ModelBuilder. Pipe connectivity was established with a tolerance of 3 feet.
5.3.1.2 Model Connectivity
Upon development of the SewerGEMS model, WSC reviewed the system features to test connectivity of the manhole and pipeline features and the system as a whole. During the connectivity analysis, WSC identified several locations of potentially looped sewer pipes and pipes that were disconnected from the remainder of the collection system. These locations were highlighted and presented to the City for clarification. Based on the information provided by the City staff, WSC updated the sewer model to better represent the collection system.
5.3.1.3 Attribute Data
Elevation information for the sewer model was provided by the City staff. Invert elevations were contained in the GIS attribute data. Rim elevations were either present in the attribute table, or estimated using the City’s 2‐foot elevation contour data. The pipelines in the sewer system model were assigned a Manning’s coefficient based on pipe material. The coefficients for each material were obtained from reference texts (6). Pipe segments without attribute data were assigned a diameter of
5.8 inches (155 pipes) or a material of unknown (UNK) and a Manning’s Roughness Coefficient of 0.013 (590 pipes).
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐18
5.4 SEWER CONDITION ASSESSMENT
WSC worked with the City’s collection system engineering and operations staff to evaluate collection system pipelines that require cleaning and maintenance in excess of the normal inspection and cleaning rotation. There were 41 areas identified in this evaluation that are included as high priority locations.
Flow monitors have been placed in 18 of these locations to help protect against sewage overflows.
5.5 SEWER COLLECTION SYSTEM CAPACITY EVALUATION
5.5.1 Lift Station Capacity Evaluation
The City has one existing sewage lift station that has no projected growth. The lift station is adequately sized to meet current demands, and therefore does not require any capacity upgrades in the future.
There is a future lift station planned near the intersection of Stowell and Black Roads to serve planned future Area 9 and Mahoney Ranch developments. This lift station will only serve future growth and is expected to be designed and constructed by developers. The City could design and construct the lift station using growth mitigation funds, and seek reimbursement from future users, but that would require policy considerations that are beyond the scope of this study.
5.5.2 Collection System Pipeline Capacity Evaluation
The collection system was analyzed during PHWWF under existing, 5‐yr, 10‐yr and Buildout scenarios.
WSC prepared an initial list of projects based on testing the pipeline for exceedance of the maximum allowable depth/diameter ratio (d/D) of 0.6 for pipes 10‐in and less and 0.75 for pipes 12‐in and larger at each of the flow scenarios. The list was then evaluated by City operations staff for reasonableness, with a focus on determining if the preliminary existing deficiencies matched their observations in the field. After the first preliminary run, numerous pipelines were identified with insufficient elevation or diameter data to accurately determine pipeline capacity. With this information the City surveyor and operators measured the insitu slope of many unknown mains and updated the City GIS database with this information. The collection system operators gathered pipeline diameters at the same time, and the City updated the GIS database with this information.
WSC then updated the hydraulic model with the up to date GIS database and redeveloped a list of preliminary projects for review by the City. The internal review was favorably received by the City, with known problems evident in the analysis and new problems identified in the existing collection system that were believable. A few projects were eliminated at this stage, when additional elevation and diameter data was once again updated.
With the final list of projects failing the d/D test, WSC prepared a comprehensive list of projects with detailed flow and capacity tables for each segment of pipeline failing the d/D capacity test. These tables are included in each project sheet attached in Appendix E.
City of Santa Maria 5. Wastewater Collection System Evaluation Utilities Capacity Study
5‐19
5.5.2.1 Gravity System Inverted Siphons
The City’s sewage collection system has numerous inverted siphons (see Table 5‐12), designed to convey sewage in a pipeline underneath obstructions (such as large storm drains). Inverted siphons use pressure head to convey sewage under the obstruction and back into the gravity flow pipe. Inverted siphons can be vulnerable to plugging and more frequent sanitary sewer overflows (SSOs) than other pipe segments. Although 4 of the City’s 13 inverted siphons experience an increase in flow by Buildout, none of the flow increases are enough to justify a capital project for the adjacent gravity sewer system.
Analysis of the inverted siphons requires more detailed geometric information than is available, and has not been performed. Should anticipated upstream sewer loading change, the City should evaluate the siphon capacities. However, a properly designed inverted siphon will typically have a greater carrying capacity then a similar diameter gravity sewer pipe since the pipe in an inverted siphon is allowed to flow full and under a slight pressure head. The City monitors the level of sewage in the upstream manholes with smart manhole covers. The smart covers monitor sewage level and can notify the City if water levels rise above a preset value.
Table 5‐12. Sewer Collection System Inverted Siphon Inventory No. Siphon Name/Location
Part of a CIP
project?
Does it experience
increased flow at
Buildout?1
1 S Miller: Cook/Orange No Yes
2 S Miller: Orange/Central No Yes
3 S Miller: Central/Boone No Yes
4 W McElhany Ave: Barbara No No
5 W McElhany Ave: Walnut No No
6 W McElhany Ave: Thornburg No No
7 W McElhany Ave: Elm No No
8 100 Block E Palm @
Broadway
No Yes
9 S Western/Church No No
10 319 N Oakley No No
11 927 N School No No
12 923 N Miller No No
13 918 N miller No No
1 The City has installed manhole covers with integral level sensing and notification capabilities in order to monitor the level of flow in the upstream manhole in the siphons. If the level rises too high the City will receive a notification alarm and can respond to prevent an overflow.
City of Santa Maria 6. Recommended Sewer Collection System Capital Projects Utilities Capacity Study
6‐1
6 RECOMMENDED SEWER COLLECTION SYSTEM CAPITAL PROJECTS
This chapter presents the recommended capital improvement projects for the sewer collection system and the assumptions used in the preparation of the cost opinions. The projects are prioritized based on the following:
A. Current deficiency
B. 0‐5 year deficiency
C. 5‐10 year deficiency
D. Build‐out deficiency
Project identification criteria are using peak hour flow with a d/D of greater than 60% for 10‐in and smaller pipes and a d/D of greater than 75% for 12‐in and larger pipes.
There are a few projects that will result in a diameter progressions such as 10 15 12 as sewage moves downstream. Considering that not all of the manholes have been accurately surveyed, WSC recommends survey and confirmation of the projects prior to design.
6.1 COST OPINION BASIS AND ASSUMPTIONS
The cost opinions (estimates) included in this CIP are based upon the Class 4 Conceptual Report Classification of Opinion of Probable Construction Cost as developed by the Association for the Advancement of Cost Engineering (AACE) Cost Estimate Classification System. The purpose of a Class 4 Estimate is to provide a conceptual level effort that has an expected accuracy range from ‐30% to +50% and the inclusion of an appropriate contingency for planning and feasibility studies. The conceptual nature of the design concepts and associated costs presented in this CIP are based upon limited design information available at this stage of the projects. These cost estimates have been developed using a combination of data from RS Means CostWorks®, recent bids, experience with similar projects, current and foreseeable regulatory requirements and an understanding of the necessary project components.
As the projects progress, the design and associated costs could vary significantly from the project components identified in this CIP.
The recommended projects and these cost opinions are based on the following assumptions:
7. For projects where applicable cost data is available in RS Means CostWorks® (e.g. pipeline installation), cost data released in Quarter 1 of 2014, adjusted for the Central Coast, is used.
Material prices were further adjusted in some cases to provide estimates that align closer with actual local bid results.
8. For projects where RS Means CostWorks® data is not available, cost opinions are generally derived from bid prices from similar projects, vendor quotes, material prices, and labor estimates, with adjustments for inflation, size, complexity and location.
9. Cost opinions are in 2014 dollars (ENR Construction Cost Index of: 9701.96 for March 2014).
When budgeting for future years, appropriate escalation factors should be applied. The past 5 year average increase of the ENR CCI 20 City Average is considered a reasonable factor to use for escalation.
City of Santa Maria 6. Recommended Sewer Collection System Capital Projects Utilities Capacity Study
6‐2
10. Cost opinions are “planning‐level” and may not fully account for site‐specific conditions that will affect the actual costs, such as soil conditions and utility conflicts.
11. Construction Costs include the following mark‐up items:
a. 5% of construction item sub‐total to account for unknown items not included in the opinion of cost.
b. 15% construction contingency based on construction sub‐total.
12. Total Project Costs include the following allowances:
a. 15% of Construction Total for project development, including administration, alternatives analysis, planning, engineering, surveying, etc. b. 10% of Construction Total for construction phase support services, including administration, inspection, materials testing, office engineering, construction administration, etc.
6.1.1 Bypass Pumping Allowance
The large diameter sewer projects include a substantial allowance for bypass pumping; however, the intention is to design the large diameter sewers in such a manner that long term bypass pumping is not required. Therefore, the City could plan to reduce or eliminate the bypass pumping costs for the large sewers when it is known the construction will occur parallel to the existing main.
6.1.2 Other Calculation Assumptions
Sewer Laterals: WSC assumed each sewer lateral would be 4‐in diameter and 25‐ft long.
Laterals are counted from GIS lateral data.
Sewer Manholes: Manholes are spaced every 400‐ft with a minimum of two per project.
Pipe Material: All gravity sewer mains are SDR PVC.
Sewer Depths: Sewer depths are based on GIS data.
Pavement Repair: The cost for pavement repair is based on repairing the trench with hot mix asphalt at the trench width plus 2‐ft (t‐section with 1‐ft on each side) at a depth of 5‐inches. Additional paving, overlays, or seal coats are not included. Trench width is the pipe diameter plus 1.5‐ft with a minimum of 2‐ft for mains and 1.5‐ ft for laterals.
6.2 RECOMMENDED SEWER COLLECTION SYSTEM CAPITAL PROJECTS Table 6‐1 provides a summary of the sewer collection system projects. Detailed project descriptions, which include scope, capacity, alternatives, and estimated project duration and cost are included in Appendix E. Plate 2 enclosed with the study, shows a large scale map of the collection system and the phased improvements. Plate 3 enclosed with the study, shows a large scale map of the collection system and the phased sewage flow growth and downstream impacted pipelines.
City of Santa Maria 6. Recommended Sewer Collection System Capital Projects Utilities Capacity Study
6‐3
Table 6‐1. Recommended Sewer Collection System Capital Projects Priority
Group
Priority
No. Group Name
Total
Length
(ft)
New
Diam
(in)
Old
Diam
(in)
Total Project
Cost
A 1 Dejoy Phase II 5,520 36 27, 30 $3,866,000
A 2 Knudsen Way 660 18 15 $257,000
A 3E Cook St 720 15 8 $251,000
A 4 McCoy Ln and CA‐135 Intersection 100 15 8 $54,000 A 5 Between W Creston St and CA‐135 230 12 10 $116,000 A 6 Between S Airpark Dr and Skyway Dr 1,090 12 8, 10 $348,000 Group A subtotal $4,892,000
B 1W Main St 50 21 14 $26,000
Group B subtotal $26,000
C 1Parallel to W Main St 1,920 36 27 $1,483,000
C 2E Tunnel St 550 15 12 $225,000
C 3 East Fesler St 1,700 15 10 $1,112,000
C 4 Between Channel Dr and Preisker Ln 440 15 10, 12 $166,000 C 5 Alcala Dr 1,400 12 6, 8 $531,000
C 6 Rowland Dr 560 12 10 $181,000
C 7W Camino Colegio Rd 500 12 8 $170,000
C 8 Elaine Ave 520 8 6 $141,000
Group C subtotal $4,009,000
D 1 Southwest Trunk 13,320 42 27, 30 $11,675,000
D 2 West Main Trunk 4,880 36 27 $3,510,000
D 4W La Brea Ave 5,230 21 15 $2,035,000
D 5W McCoy Ln 370 18 15 $119,000
D 7 North Railroad 2,440 15 12 $806,000
D 8 Between W Main St and W Church St 1,730 12 9 $625,000 D 9 Santa Maria Trunk 2,410 12 10 $829,000
D 10 S McClelland St 790 10 6, 8 $250,000
D 11 Biscayne St 200 12 8 $86,000
D 12 Between W Chapel St and W Main St 1,260 10 8 $437,000 D 13 Between W Mill St and W Chapel St 1,240 10 8 $436,000 D 14
Between W Pershing St and W Camino
Colegio Rd 870 10 8 $310,000
D 15 Sunrise Dr 300 12 10 $95,000
D 16 Between Skyway Dr and Industrial Pky 810 12 8 $297,000 D 17 Between W Fesler St and W Mill St 3,710 8 6 $1,108,000 Group D subtotal $22,618,000
Total of all Groups $31,545,000
Footnote
Total project cos t i ncludes the following: an added 15% cons truction conti ngency, an added 10% cos t for the cons truction phase, and an added 15% for project development City of Santa Maria 7. Works Cited
Utilities Capacity Study
7‐1
7 WORKS CITED
1. Santa Barbara County Association of Governments . Regional Growth Forecast 2010‐2040. December 2012.
2. State of California, Department of Finance. E‐8 Historical Population and Housing Estimates for Cities, Counties, and the State, 2000‐2010. November 2012.
3. California Department of Public Health. California Water Works Standards. s.l. : CDPH, 2011.
4. Lindeburg, Michael. Civil Engineering Reference Manual. Belmont : Professional Publishers, 2012.
5. Haestad Methods Water Solutions. Advanced Water Distribution Modeling and Management.
Stockton : Bentley Insitute Press, 2007.
6. American Society of Civil Engineers. Gravity Sanitary Sewer Design and Construction. New York :
American Society of Civil Engineers, 1982.
7. HDR. Handbook of Public Water Systems 2nd ed. New York : John Wiley & Sons, Inc., 2001. ISBN 0‐ 471‐29211‐7.
8. California Department of Water Resources. Methodologies for Calculating Baseline and Compliance Urban Per Capita Water Use. February 2011.
9. Commission, San Luis Obispo Local Agency Formation. Templeton‐San Miguel‐Heritage Ranch Community Services Districts Sphere of Influence Update & Municipal Service Review. April 2006 : s.n.
10. Templeton Community Services District. 2011 Consumer Confidence Report. 2012.
11. Fugro Consultants, Inc. Well Field Assessment. s.l. : Templeton Commmunity Services District, 2012.
12. HDR Engineering, Inc. Handbook of Public Water Systems. New York : John Wiley & Sons, Inc., 2001. 2nd Edition.
13. Environmental Protection Agency. Fact Sheet: Announcement of Proposed Revisions to Total Coliform Rule. s.l. : EPA, 2010.
14. Wallace Group. Water System Master Plan Update. 2005.
15. —. City of Morro Bay Wastewater Master Plan Update. 2006.
16. City of Arroyo Grande. Wastewater System Master Plan. December 2012.
City of Santa Maria Appendix A Utilities Capacity Study
A
SPATIAL DEMAND ALLOCATION TECHNICAL MEMORANDUM
Technical
Memorandum
Spatial Demand Allocation TM_FINAL.docx
Date: 2/3/2015
To: Shannon Sweeney, P.E. Phone: (805) 473‐5483 City of Santa Maria
Utilities Department
Prepared by: Spencer Waterman
Reviewed by: Joshua Reynolds, P.E., Jeffery Szytel, P.E.
Project: City of Santa Maria 2012 Utilities Capacity Study SUBJECT: SPATIAL DEMAND ALLOCATION METHODOLOGY ‐ FINAL
This Technical Memorandum (TM) summarizes the methodology used to develop spatially allocated customer demands for the 2012 Utilities Master Plan Update for the City of Santa Maria (City) and is organized into four main sections:
(1) Definitions
(2) Spatially Allocated Demands
(3) Zoning Demand Factors
(4) Projected Spatially Allocated Demands
1 Definitions
For the purposes of this TM, the following defined terms are used:
‐ Customer consumption: The amount of billed metered water consumed by customers from September 2011 through September 2012.
‐ Production: The amount of water delivered into the City’s distribution system based on metered deliveries at the state water turnout and flow meters at each well. The production period is January 2009 through July 2012.
‐ Demand: The amount of water distributed through the water system based on customer consumption and water production. The methodology used to calculate demand using customer consumption and production data is discussed in detail in Section 2. ‐ Demand factor: The calculated amount of water demand per acre of each zoning category. Demand is equal to 1.08 times the customer consumption, see Section 2 for derivation.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 2 of 10
2 Spatially Allocated Demands
WSC developed spatially allocated water demands for the City’s existing distribution system by utilizing multiple techniques and tools within ESRI ArcGIS®.
The first technique utilized was a table join, which linked customer consumption data from the City’s billing database to the matching parcel addresses contained in the City’s parcel polygon shapefile. The initial join was successful for 53% of the customer records.
Customer records that did not join with a parcel address were assigned unique locations using the Geocode tool within ArcGIS®. The City provided custom address locators and composite address locators to provide known spatial references and enhance the accuracy of the geocoded locations. The result of the geocoding process was analyzed for misallocations. Most of the misallocated customers had erroneous addresses due to how they were entered in the City’s customer database and were manually allocated to their correct location. Customer records that could not be geocoded were spatially allocated using the Display XY Data tool within ArcGIS® and coordinates provided by the City.
Once all customer records were assigned a unique location, the spatial join technique was used to associate each customer record point with the data of its underlying parcel and with the City’s 2012 Zoning polygon shapefile. The spatial join of customers to parcels and zoning yielded a geodatabase of the City’s customer water consumption records that included parcel and zoning data.
Customer consumption records only include billed metered water and do not include any billed unmetered use or any non‐revenue water. Furthermore, customer consumption data used for analysis was for a one year period. Ideally, a longer period is used to calculate long term water demand so that one anomalous year does not unduly affect the water projections. Therefore, WSC scaled the one year consumption data to the average water demand (which includes all revenue and non‐revenue water) by using the average daily production of all water from January 2009 through July 2012 (12,060,632 gpd) and divided that by the average daily customer consumption (11,156,020 gpd) to create a scaling factor of 1.08109 (shown hereafter as 1.08 for brevity). The scaling factor was then used to normalize the customer consumption geodatabase to fit a longer period of production data and account for non‐revenue water to better model the total demand distributed through the City’s water system. The scaling factor of 1.08 was used by multiplying the customer consumption geodatabase to yield the demand geodatabase. Table 1 shows customer consumption and demand summarized by zoning category and Appendix A shows the spatially allocated demand map for the City’s system.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 3 of 10
Table 1. Customer Consumption and Demand by Zoning Category Zoning Code Zoning Code Description Customer
Consumption
(gpd)1
Demand (gpd)2
Residential
R‐1 Single‐Family Residential District 4,448,001 4,808,678 R‐2 Medium‐Density Residential District 1,003,775 1,085,168 R‐3 High‐Density Residential District 1,533,013 1,657,320 RA Residential Agricultural District 0 0
RMH Residential Mobile Home Park District 263,620 284,996 RSL‐1 Residential Small Lot District 504,539 545,451 Commercial
C‐1 Central Business District 103,064 111,421
C‐2 General Business District 799,178 863,981
CC Convenience Center District 11,224 12,134
CPO Commercial Office and Professional Office District 175,280 189,493 HC Highway Commercial 2,055 2,222
FS Freeway Service District 96,650 104,487
Industrial
CM Commercial and Manufacturing District 375,939 406,422 M‐1 Light Manufacturing District 385,585 416,851
M‐2 General Manufacturing District 102,089 110,367 Other
AA Airport Approach Zone Combining Regulations 0 0 AS‐I Airport Service I Zone 0 0
AS‐II Airport Service II Zone 55,653 60,166
AS‐III Airport Service III Zone 0 0
CZ Clear Zone 0 0
OS Open Space District 307,926 332,895
PD Planned Development Overlay District 0 0
PF Public Facilities and Institutional District 397,668 429,913 SP Specific Plan Zoning District 498,783 539,228
Unknown Unknown because meter is outside of City Limits 91,979 99,438 Total 11,156,020 12,060,632 1 Includes billed metered customer consumption from September 2011 through September 2012. 2 Includes the amount of water distributed through the water system based on customer consumption scaled to the average production from January 2009 through July 2012. The scaling factor of 1.08 was used to scale customer consumption to demand.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 4 of 10
3 Zoning Water Demand Factors
The final zone demand factors derived from the spatially allocated demand database are shown in Table 2.
These factors are used to project and spatially assign future water demand to the model.
Table 2. Zoning Demand Factors
Zoning
Code
Zoning Code Description Zoning
Demand
Factor
(gpd/acre)
Residential
R‐1 Single‐Family Residential District 2,500
R‐2 Medium‐Density Residential District 3,200
R‐3 High‐Density Residential District 5,000
RA Residential Agricultural District 0
RMH Residential Mobile Home Park District 1,900
RSL‐1 Residential Small Lot District 3,000
Commercial
C‐1 Central Business District 2,100
C‐2 General Business District 2,400
CC Convenience Center District 1,400
CPO Commercial Office and Professional Office District 2,900 HC Highway Commercial 4,000
FS Freeway Service District 2,800
Industrial
CM Commercial and Manufacturing District 2,600
M‐1 Light Manufacturing District 1,100
M‐2 General Manufacturing District 800
Other
AA Airport Approach Zone Combining Regulations 0
AS‐I Airport Service I Zone 0
AS‐II Airport Service II Zone 30
AS‐III Airport Service III Zone 0
CZ Clear Zone 0
OS Open Space District 1,500
PD Planned Development Overlay District 0
PF Public Facilities and Institutional District 1,200 SP Specific Plan Zoning District 4,000
Unknown Unknown because meter is outside of City Limits 1,800 Zoning demand factors were developed using the demand geodatabase to calculate water demand and served acreage for each zoning category. The water demand per acre was calculated to yield zoning demand factors for each zoning category. Table 3 shows the zoning demand factors calculated by using the water demand and served acreages for the City’s entire system.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 5 of 10
Table 3. Zoning Demand Factors
Zoning
Code
Zoning Code Description Demand
(gpd)
Served
Acreage
Demand
Factor
(gpd/acre)
Residential
R‐1 Single‐Family Residential District 4,808,678 2,040 2,357 R‐2 Medium‐Density Residential District 1,085,168 374 2,900 R‐3 High‐Density Residential District 1,657,320 348 4,758 RA Residential Agricultural District 0 0 0
RMH Residential Mobile Home Park District 284,996 149 1,911 RSL‐1 Residential Small Lot District 545,451 320 1,707 Commercial
C‐1 Central Business District 111,421 52 2,123
C‐2 General Business District 863,981 415 2,081
CC Convenience Center District 12,134 8 1,429
CPO Commercial Office and Professional Office District 189,493 91 2,075 HC Highway Commercial 2,222 1 3,980
FS Freeway Service District 104,487 37 2,830
Industrial
CM Commercial and Manufacturing District 406,422 385 1,057 M‐1 Light Manufacturing District 416,851 463 901
M‐2 General Manufacturing District 110,367 142 779 Other
AA Airport Approach Zone Combining Regulations 0 0 0 AS‐I Airport Service I Zone 0 0 0
AS‐II Airport Service II Zone 60,166 2,022 30
AS‐III Airport Service III Zone 0 0 0
CZ Clear Zone 0 0 0
OS Open Space District 332,895 281 1,187
PD Planned Development Overlay District 0 0 0
PF Public Facilities and Institutional District 429,913 470 915 SP Specific Plan Zoning District 539,228 137 3,934 Unknown Unknown because meter is outside of City Limits 99,438 130 764 Total 12,060,632 7,865 ‐
Based on input from the City Utilities and Planning departments, WSC looked at water demand within different portions of the City established based on the U.S. Census Bureau’s 2010 persons per household (pphh) data at the tract level. The analysis of areas based on pphh is based on the expectation that the City will experience infill, redevelopment, and densification of its uses through buildout. Therefore, it is assumed that the areas with higher pphh reflect the anticipated intensity and density of development at buildout. To verify this assumption, the “Northern Study Area” and the “Southern Study Area” were established as shown in Figure 1.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 6 of 10
Figure 1. PPHH Study Area Map
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 7 of 10
Zoning demand factors were developed for each study area and compared with the zoning demand factors for the whole system as shown in Table 4.
After comparing the different demand factors, the City and WSC decided to use the largest demand factor between the whole system and Northern Study Area for each zoning category and round the demand factor to the nearest hundred. This resulted in the zoning demand factors shown in Table 2 and used to project future spatially allocated water demand.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 8 of 10
Table 4. Study Areas - Zoning Usage Factors Comparison
Demand
(gpd)
Served
Acreage
Demand
Factor
(gpd/acre)
Demand
(gpd)
Served
Acreage
Demand
Factor
(gpd/acre)
Demand
(gpd)
Served
Acreage
Demand
Factor
(gpd/acre)
R‐1 Single‐Family Residential District 4,808,678 2,040 2,357 1,585,687 630 2,518 922,472 404 2,284 R‐2 Medium‐Density Residential District 1,085,168 374 2,900 356,636 110 3,231 280,862 98 2,859 R‐3 High‐Density Residential District 1,657,320 348 4,758 791,873 157 5,038 122,231 43 2,868 RA Residential Agricultural District 0000 0
RMH Residential Mobile Home Park District 284,996 149 1,911 200,854 117 1,719 0 RSL‐1 Residential Small Lot District 545,451 320 1,707 239,703 81 2,973 146,260 45 3,261 C‐1 Central Business District 111,421 52 2,123 0 43,308 24 C‐2 General Business District 863,981 415 2,081 161,026 67 2,404 392,622 240 1,636 CC Convenience Center District 12,134 8 1,429 0 0
CPO
Commercial Office and Professional Office
District 189,493 91 2,075 20,296 7 2,853 88,872 49 1,808 HC Highway Commercial 2,222 1 3,980 0 0
FS Freeway Service District 104,487 37 2,830 18,929 10 1,805 21,001 8 2,703 CM Commercial and Manufacturing District 406,422 385 1,057 211,138 81 2,611 128,436 133 967 M‐1 Light Manufacturing District 416,851 463 901 2,087 2 1,107 381,226 395 966 M‐2 General Manufacturing District 110,367 142 779 7810 AA Airport Approach Zone Combining Regulations 0000 0
AS‐I Airport Service I Zone 0000 0
AS‐II Airport Service II Zone 60,166 2,022 30 0 60,166 2,022 AS‐III Airport Service III Zone 0000 0
CZ Clear Zone 0000 0
OS Open Space District 332,895 281 1,187 107,928 70 1,536 80,311 91 880 PD Planned Development Overlay District 0000 0
PF Public Facilities and Institutional District 429,913 470 915 122,397 102 1,200 201,612 199 1,014 SP Specific Plan Zoning District 539,228 137 3,934 140,112 35 3,991 12,015 3 3,754 Unknown Unknown because meter is outside of City
Limits 99,438 130 764 5,211 3 1,786 66,600 84 789
Total 12,060,632 7,865 ‐ 3,752,745 1,480 2,947,993 3,837 Commercial
Industrial
Other
Zoning
Code Zoning Code Description
Whole System Northern Focused Study Area Southern Focused Study Area Residential
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 9 of 10
4 Projected Spatially Allocated Demands
The City provided a spreadsheet (see Appendix B), which identified the amount of underutilized and vacant acres of land within each Transportation Analysis Zones (TAZ). Each TAZ was categorized by zoning type and 5‐ year, 10‐year, and builldout timeframes. The zoning water demand factors were applied to each TAZ’s potential development acreage to develop spatially allocated demand projections by zoning type and timeframe. Table 5 shows projected gross water use at buildout and Appendix C shows the spatially allocated demand points for each of the TAZs at buildout.
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Page 10 of 10
Table 5. Projected Buildout Gross Water Use
Zoning
Code
Zoning Code Description Demand
(gpd)2
5 year
Projected
Demand
(gpd)
10 year
Projected
Demand
(gpd)
Buildout
Projected
Demand
(gpd)
Residential
R‐1 Single‐Family Residential District 4,808,678 5,090,177 5,182,712 5,424,397 R‐2 Medium‐Density Residential District 1,085,168 1,166,576 1,246,123 2,827,038 R‐3 High‐Density Residential District 1,657,320 1,828,552 1,969,873 3,179,874 RA Residential Agricultural District 0
RMH Residential Mobile Home Park District 284,996 284,996 284,996 284,996 RSL‐1 Residential Small Lot District 545,451 545,451 736,920 736,920 Commercial
C‐1 Central Business District 111,421 111,421 111,421 113,731 C‐2 General Business District 863,981 917,561 1,240,410 1,983,360 CC Convenience Center District 12,134 12,134 58,021 65,371 CPO Commercial Office and Professional
Office District
189,493 203,993 213,699 576,949
HC Highway Commercial 2,222 2,222 2,222 2,222
FS Freeway Service District 104,487 117,563 134,363 134,363 Industrial
CM Commercial and Manufacturing
District
406,422 411,496 687,980 1,240,005
M‐1 Light Manufacturing District 416,851 425,538 492,201 1,128,964 M‐2 General Manufacturing District 110,367 113,259 137,339 261,525 Other
AA Airport Approach Zone Combining
Regulations
0 AS‐I Airport Service I Zone 0
AS‐II Airport Service II Zone 60,166 60,166 60,166 77,356 AS‐III Airport Service III Zone 0
CZ Clear Zone 0
OS Open Space District 332,895 332,895 332,895 332,895 PD Planned Development Overlay District 0
PF Public Facilities and Institutional
District
429,913 505,198 630,226 794,736
SP Specific Plan Zoning District 539,228 539,228 539,228 539,228 Unknown Unknown because meter is outside of
City Limits
99,438 99,438 99,438 99,438
Total 12,060,632 12,767,864 14,160,233 19,803,368
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Appendix A
Appendix A. Spatially Allocated Demands Map
See “Santa Maria Demands per Account by Zoning” large scale map attached to this report. (!Õ
(!Õ
!@
(!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
!@ !@
!@
!@
!@
!@!@ !@ !@
!@!@!@
!@
!@!@!@!@!@!@!@
!@!@!@!@!@!@!@
!@!@!@
!@!@ !@
!@
!@
!@
!@!@!@!@!@
!@!@!@
!@ !@!@ !@
!@
!@!@ !@!@!@!@
!@
(!Õ (!Õ
(!Õ
!@
!@
!@
!@ !@
!@
!@Õ !@
!@
!@!@
!@
!@
!@
!@
!@
(!Õ
(!Õ
(!Õ
!@ !@ !@
!@
!@
!@
!@ !@
!@
!@
!@ !@!@
!@
!@ !@
!@ !@ !@ !@
!@
!@
!@ !@Õ
!@!@!@ !@!@!@!@ !@ !@ !@
!@!@
!@!@ !@ !@
!@!@!@
!@ !@
!@
!@ !@ !@!@!@ !@
!@
!@ !@ !@!@!@
!@!@
!@!@
!@
!@!@
!@
!@
!@
!@
!@ !@!@!@ !@
!@!@
!@
!@ !@
!@
!@!@!@
!@
!@ !@
!@
!@
!@
!@
!@!@ !@ !@
!@
!@
!@ !@!@
(!Õ
(!Õ (!(!Õ (!Õ (!Õ (!Õ Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
!@
!@
!@!@Õ
!@ !@!@!@!@ !@
!@
!@
!@
!@
!@ !@ !@!@
!@
!@ !@
!@!@
!@!@
!@
!@ !@
!@
!@
!@
!@
!@
!@!@!@!@ !@!@!@!@ !@ !@ !@ !@!@ !@
!@
!@
!@
!@
!@ !@!@ !@
!@!@Õ !@ !@!@
!@
!@!@!@!@!@!@
!@ !@
!@
!@
!@
!@
(!Õ
(!Õ
(!Õ
(!Õ
!@
!@Õ
!@
(!Õ
(!(!ÕÕ (!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
!@
!@
(!Õ (!Õ
!@ !@!@!@
!@ !@Õ
!@ !@
!@
!@
!@
!@!@ !@
!@
(!Õ
!@
!@ !@ !@
!@!@ !@ !@!@!@!@
!@
!@!@
!@
!@
!@ !@ !@!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ !@!@Õ
!@
!@
!@!@!@!@
!@
(!Õ
!@
!@
!@ !@ !@!@ !@!@ !@
!@!@Õ
!@!@ !@ !@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
!@
(!Õ
(!Õ
!@
!@
!@
!@
!@
!@
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ(!Õ
(!Õ (!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
O
(!Õ
!@
!@!@
!@
!@
!@
!@
!@
!@
!@
(!Õ
(!Õ
!@ !@
!@ !@!@
!@Õ
(!Õ
(!Õ
!@!@
!@!@
!@
!@
!@
!@
!@!@!@!@!@ !@ !@
!@ !@ !@!@ !@!@ !@!@
!@
!@
!@
!@
!@
!@
!@
!@
!@
!@!@
!@
!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(! (!Õ Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
!@
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!
(!Õ (!Õ Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@ !@
!@
!@ !@
!@
!@
!@!@
!@!@
!@
(!Õ
!@
(!Õ (!Õ
(!Õ
(!Õ !@ !@ !@ !@
!@Õ
!@ !@
!@
!@!@
!@
!@
!@
!@
!@ !@
(!Õ
(!Õ
(!Õ
!@!@
(!Õ
(!Õ (!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
OO
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ(!Õ
(!(!ÕÕ
O
(Õ
O(Õ
(Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
O
O O
O
O O O
OO
O(ÕOO
O OOOOO
OOOOOO
OO OOOOO
O
(Õ
O
O O
O
O O O
O O
(Õ
O
O
O
(Õ
O
OO
O
O O
O (Õ
OO O(Õ
OOO OO
OOO (OOOO OOO O
Õ
(OÕ
O
(!Õ
(!Õ
(Õ
!@
!@Õ !@!@
!@
!@!@Õ !@!@
!@!@Õ
!@
!@!@
!@
(!Õ
!@!@
(!Õ
!@ !@ !@ !@
!@
!@!@ !@
!@!@
!@!@
!@
!@
!@
!@!@!@
(!Õ
(!Õ
(!Õ
(!Õ
!@!@
Õ
(!Õ
(!Õ
(!Õ
HWY 101
A
W MAIN
S MILLER
S COLLEGE DR
S BROADWAY
S DEPOT
E MAIN
W STOWELL RD
SKYWAY DR
N BLOSSER RD
PRELL RD
N MILLER
W BETTERAVIA RD
N BROADWAY
N RAILROAD AV
HIGHWAY 135
S BRADLEY RD
W COOK
ORCUTT RD
W MC COY LN
W CARMEN LN
E ST
W BATTLES RD
N SUEY RD
E FESLER
E STOWELL RD
E JONES
S PINE
W TAYLOR
W FESLER
E FOSTER RD
E COOK
E BETTERAVIA RD
W ALVIN AV
W BOONE
E CHAPEL
E MCCOY LN
S SMITH
N LINCOLN
HILLVIEW RD E BOONE
HANSON WY
1ST ST
F
BULL CANYON RD
E ALVIN AV
W CRESTON
W EL CAMINO E EL CAMINO
W FOSTER RD
W CHURCH
N PANTHER DR
E ORANGE
N THORNBURG
N COLLEGE DR
ROSEMARY RD
E BATTLES RD
S BLOSSER RD
E CYPRESS
N WESTERN AV
DRAKE DR
SUNRISE DR
W FAIRWAY DR
W MILL
W DONOVAN RD
FRONTAGE RD
E SEAWARD DR
W MORRISON AV
E PARK AV
MILES AV
S SANTA MARIA WY
S BRADLEY WY
MAHONEY RD
N PREISKER LN
UNNAMED
N PINE
SANTA MARIA WY
LAKEVIEW DR
WINTER RD
N MARY DR
W HARDING AV
E GRANT W GRANT
W TAFT
INDUSTRIAL PY
W UNION VALLEY PY
W SONYA LN
PADEN ST
W POLK
W HIDDEN PINES WY
DUTARD RD
CARLOTTI DR
S LINCOLN
S SPEED
S RANCH
S SUEY RD
FOXENWOOD DR
PRIVATE
E TAFT
N DEJOY
W CHAPEL
E ENOS DR
E INGER DR
E DONOVAN RD
W ENOS DR
W LA BREA AV
CLUBHOUSE DR
S SCHOOL
N EAST AV
W PARK AV
SHIRLEY LN
S EAST AV
N LYNNE DR
N RUSSELL AV
N SCHOOL
JONES
E CAMINO COLEGIO
W WILLIAMS
DICKSON DR
W CANAL ST
W VIA ROSA
S OAKLEY AV
E MC ELHANY AV
E MARIPOSA WY
RAYMOND AV
CAMBRIDGE WY
UNION VALLEY PY
E CRESTON
W AGNES AV
WEST
AIRPARK DR
E CENTRAL AV
ANGELES RD
DAHLIA PL
MITCHELL RD
N BRADLEY RD
N BRIAN AV
NOVA
S WESTERN AV
E NEWLOVE DR
GAYLENE DR
E MILL
PRADINI WY
W MONROE
S DEL SUR
S BISCAYNE ST ALLEY
W BUNNY AV
S ELIZABETH
ESTES DR
LORENCITA DR
S MC CLELLAND
S BERRY LN
S RAILROAD AV
S SAN MIGUEL
RANCHO VERDE
E MONROE
W BETHEL LN
LARK ST
W ATLANTIC PL
S THORNBURG
E SAN YSIDRO ST
S NICHOLSON AV
S RUSSELL AV
OLIVE DR
N PALISADE DR
FAIRMONT AV
S WALLIS AV
E LEE DR
W POPLAR
W WALLER LN
W MC ELHANY AV
S RUBEL WY
E OAK
LANCASTER DR
LOS PADRES RD
HUMMEL DR
N BENWILEY
OCOTILLO AV
SILER LN
S CONCEPCION AV
W TUNNELL
N CONCEPCION AV
WINSTON DR
N SMITH
SOUTHSIDE PKWY
MAJESTIC DR
W JONES
E TAYLOR
W SUNSET AV
W KNUDSEN WY
HARSIN LN
DRIVEWAY
S AIRPARK DR
PABST LN
TAMA LN
E MC CLOUD
E LEWIS RD
VIA ASUETO
N DEPOT
E SIERRA MADRE AV
NITA
W PROVANCE AV
LARCH AVE
W KINGSTON DR
MARIAN DR
N MAGELLAN DR
DOWNING LN
N STOKES AV
ALLEY CHAPEL MILL
W LEE DR
UNION VALLEY PK
N BARBARA
BROOKSIDE AVE
N CANYON DR
W DAL PORTO LN
ALLEY MAIN CHAPEL
AUTO PARK DR
VIA RICO
N TEELYNN AV
N BENTLEY AV
E ROEMER WY
MARVIN ST
N VINE
E VICKIE AV
CALIFORNIA BLVD
LES MAISONS
N CESAR E. CHAVEZ
E COX LN
BERWYN DR
FOXENWOOD LN
S PALISADE DR
VIA QUANTICO
TYLER DR
E DANIEL DR
N BONITA
CORAL DR
S BUNFILL DR
E JEWEL
E PLAZA DR
E BUNNY AV
FURUKAWA WY
N ELM AV
W ORCHARD S PERGOLA ST
E ORCHARD
W LIBERTY
ROBLE
N LAZO WY
FAIR OAKS DR
BANYAN WY
MILLSTONE AVE
E WALLER LN
W MARSALA AV
BLUE RIDGE DR
LUPIN LN
S WESTGATE RD
BERRYWOOD DR
ALLEY E COOK E ORANGE
W HAWTHORN
N ALISON AV
SEQUOIA DR
W CRAIG DR
E LAGUNA AV
COLEBROOK DR
MEREDITH LN
W FAIRWAY VISTA DR
E MONTEREY RD
W ELAINE AV
TIFFANY DR
AMBER LN
W LEMON
W MAYTEN
E ROSE AV
N SCOTT DR
ALLEY E CENTRAL E BOONE
WILSHIRE LN
PARKLAND DR
POPPY LN
N FIESTA WY
E SUNSET AV
SILVER LEAF DR
S ROD DR
E UNION VALLEY PY
W GUNNER
WHITE CT
LA SALLE DR
TERMINAL DR
N VIA CARRO
GOODWIN RD
W FRANK LN
WILDHAVEN CR
E JACKIE LN
S TRINITY DR
N ARRIBA WY
VIA HIELO
E ARCTIC AV
N WOODLAWN DR
SAINT ANDREWS WY
SHEPARD DR
TOWNSEND LN
IRONWOOD DR
EMERALD DR
STANFORD RD
E ALCALA DR
MONTANO DR
TREE LINE DR
MORRO DR
N EASY ST
SAPPHIRE DR
E HAWKINS WY
GREENACRE DR
GARNET WY
E KOVAL LN
ELMWOOD DR
E WILLIAMS
W NEWLOVE DR
QUAIL MEADOWS DR
LOCH LOMOND
E TUNNELL
LILY LN
FELICIA DR
E STACY ANN TR
W ROBERT LN
E ROWLAND DR
N JOHNSON DR
S LINDA DR MELANIE CT
N ACACIA
W CHANNEL DR
N VIA ESTABLO
EVELYN CT
S ELLEN LN
JASMINE LN
HADLEY WY
S BARBARA
COURTNEY DR
S ELLIOT ST
S SCOTT DR
VINELAND DR
PINEWOOD DR
N DIVIDE WY
AMY WY
N MC CLELLAND
N LEXINGTON AV
S ROSITA AV
FLEMING LN
TEAKWOOD DR
E BILBAO DR
BRIDGEPORT RD
CAMERON AV
FLOWER ST
TURTLE CREEK DR
CAMBRIA AV
N LILAC
LAUREN LN
S CURRYER
BROADWAY ALLEY
ALLEY W MAIN W CHURCH
FERNDALE DR
HILLTOP RD
WOODLAND ST
W VISTA DEL RIO
ATHERLY LN
N EBONY
E LOUISA TR
LIGHTNING
W JEWEL
W COX LN
S SUPERIOR
MARILYN WY
S PAYTON WY
N SENECA
W HERMOSA
MARIOTT RD
N MARIAH DR
N GOLDEN DR
W PRAIRIE LN
W JILL
OAKWOOD DR
EAGLE CT
COUNTRY HILL RD
N CAT
STUBBS LN
S EL MIRLO
W EAGLETON AV
E SLOAN TR
W PERSHING
DARTMOUTH LN
W ROSE AV
E BORGES DR
S PARAISO ST
LEONA
MORNING RIDGE RD
S CURTIS CT
PREISKER PARK DR
PRIMROSE LN
E HARDING AV
S LA COSTA DR
E GILEA CT
SWALLOW ST
VIA RUBIO
PIERCE DR
HARRISON DR
RAMP S 101 MAIN
N BAY AV
ODIE LN
FARNEL RD
JODI CT
MURRAY DR
W TRIMERA AV
N SIGNAL AV
E EL NIDO CT
MON CHERE LN
N SUTTER
ANTONE LN
W VISTA MONTANA
S CAPITOL DR
S WALNUT DR
CYPRESS WY
W LOLITA LN
PIONEER DR
SHADYGLADE DR
KAMEO
W SHEILA LN
N LUCAS DR
E CHURCH
S HART DR
W CAMAROSA ST
REDWOOD AV
SAND HILL LN
S BONITA
MIRA LOMA DR
N RANCH
N OXFORD AV
WILLOW WALK WY
S BLUEBIRD ST
ALLEY E TUNNELL E EL CAMINO
S STARDUST DR
W DUVALI DR
GLENVIEW DR
BUCKSKIN DR
LARKSPUR DR
N VALERIE
E LAS FLORES WY
KINGS LN
W SILVERADO AV
CRILENE LN
BEDFORD PL
LINWOOD LN
N CURRYER
S CALDERON DR
DOLCETTO LN
W CAMINO COLEGIO
E AUTO PLAZA DR
E LAHR LN
E HANCOCK AV
N OAKLEY AV
S LUCAS DR
MARGIE AVE
ALLEY W FESLER W TUNNELL
VICTORIA PL
AVIATION WY
W VISTA DEL SOL
CHADWELL DR
W ORANGE
DIXIELEE ST
BIRCH
VIA DE LA CRUZ
N MT WHITNEY WY
RAMP N 101 SANTA MARIA WY
S HASLAM DR
N RIVER ROCK CT
W WINDSOR
W PATTI LN
ALLEY E MILL E FESLER
CABALLERO LN
RAABERG WY
COOLEY LN
LINDALEE ST
N DARBETON AV
COTTAGE LN
TOPAZ WY
ALLEY W MILL W FESLER
E DENA WY
RAMP SANTA MARIA WY S 101
W BARRETT
STOWELL CNTR PZ
W MARIPOSA WY
DANIEL DR
FARRELL DR
MOONDANCE
BRIDLE TRAILS LN
CORSAIR CI
S CASELLI WY
S CALLE MIRASOL
VERONICA LN
LINDEMAN LN
RAYVILLE LN
E FIRE FOX DR
RAMP STOWELL N 101
W ROSEWOOD DR
E BARCELLUS AV
W CYPRESS
RUBY CT
E PLAYA BLANCA
S SANTILLAN AV
RAMP MAIN N 101
YALE PL
E HERMOSA
S EAGLE CT
ALLEY E DONOVAN E LEE
VIA YNEZ
E EVERGREEN AV
ALLEY MAIN CHURCH
ALLEY E HERMOSA E ALVIN
RAMP S 101 BROADWAY
N DEPOT DR
E JONATHAN PL
W HERMOSA DR
N HART DR SUNNYSIDE AVE
S OLYMPIA DR
E SKYLARK CT
W LAS FLORES WY
HWY 135
S CENTERPOINTE PY
W RIMES CT
N KENSINGTON AV
CITATION CT
W TIMBER LN
W ELIZA RD
RAMP S 101 BETTERAVIA
DAKOTA DR
LA PURISIMA AV
E DOANE AV
SARA CT
S SORRENTO LN
BAROLO PL
N SUEY PARK DR
LIBERATOR
SWALLOW CT
W ROSCHELLE LN
E MCNEIL AV
SANDY CT
TERRACE AVE
WALLER PARK ROAD 7
ROEMER CT
W TAUNTON DR
E DE ARMOND PL
BAYLOR LN
REGAL DR
W GINKGO CT
ALLEY S WESTERN S RUSSELL
E CROSSROADS LN
W SOMBRERO WY
RAIN TREE DR
ALLEY E MAIN E CHURCH
EDGEWOOD AVE
RAMP MAIN S 101
S FROSTY WY
ASPEN LN
E KATHRYN WY
E HENRY AV
COSSA
WENDY WAY
MT VERNON
SYCAMORE
QUAIL RIDGE DR
TOWN CENTER EAST
S HIND PL
MICHELLE DR
TIERRA BRISAS DR
VALLEY OAK PL S STRATFORD AV
DE GAMA DR
THOMPSON WY
SWORD CT
NOBLE WY
BETTERAVIA RAMP S 101
ALLEY BROADWAY TARGET
VIA BELIZ
N CONCORD AV
LAVONNE DR
PVT (Casa Grande Mbl Est)
E TABITHA LN
BREEZY GLEN DR
N NAVARRA WY
E PORTLAND DR
HANGAR RD
RONALD PL
W ESSEX CT
RIDGE VIEW DR
E BENETTA DR
S COUNTRY CLB VILLGE DR
W WOOD MILL LN
ERIN CT
E VARNER CT
WILDWOOD RD
E PREMIER CT
E HARPER CT
S SAVOY DR
ASH AV
SHELLIE CT
ALLEY W LEMON W BOONE
HAGERMAN (CITY OF SM)
GLENRIDGE LN
N KATHLEEN CT
FILAMINA
ALLEY SKYWAY THOMPSON
ALLEY S BROADWAY S McCLELLAND
LESLEY CT
MARIE CT
E JONES E 101
W MENUSA CT
S FLORA WY
N ELIZABETH
N BICKNELL AV
RAMP S 101 DONOVAN
S CASTLEROCK LN
ASTER PL
ALLEY MAIN FESLER
S LASSEN DR
S ADLER CT
ALLEY N BROADWAY N McCLELLAND
PRIVATE (AIRPORT MOB HMS)
W CENTURY
LOS PINOS CT
ALLEY S BROADWAY S THORNBURG
DAN CT
LELA LN
E COLUMBIA DR
N ROSALIND DR
E FLOYD CT
DANIJAY WY
N CHRISTINA
S WEDGEWOOD DR
W HACIENDA WY
S KNIGHTBRIDGE DR
ALLEY MARY WESTERN
N WHITE DR
S CETONA LN
W BLANCHE CT
E LAKESIDE PY
E FORBES PL
NORTHPOINT CIR
RAMP DONOVAN N 101
PVT LA MARIA MBL HM PARK
E DEL NORTE
ALLEY S McCLELLAND S SPEED
LADD LN
MAGGIE LN
N DEJOY CT
E ALCAZAR DR
W ANTHONY PL
HIBISCUS CT
ALLEY W BLOSSER W FARMEL
ALLEY BETTERAVIA COOLEY
S JAYE CT
E CALLE BONITA
E GREGORY CT
W ELM AV
E STOWELL RD W 101
ALLEY W COOK W ORANGE
ALLEY E CHAPEL E MILL
PAM CT
SMOKE TREE LN
COVERDALL
CABO SAN JOSE
N GUNDERSON LN
ALLEY E MAIN MILL
S ADAM WY
W JOY WY
GIBSON LN
PINELAKE ST
S LONGDRIVE LN
S IRONRIDGE CT
TILIA ST
E MAMMOTH DR
OAKLEY CT
S WHITEDOVE DR
ALLEY W CHURCH W CYPRESS
RANCH
MABLE CT
N DONNER CT
GLEN LN
HUMMINGBIRD LN
VALENTINE CT
MONICA CT
W PASTORIA AV
E ROSE PL
W COX LN
E BUNNY AV
N CHRISTINA
ALLEY
ROSEMARY RD
N EAST AV
W BOONE
N LINCOLN
N CURRYER
E STOWELL RD
N OAKLEY AV
N LUCAS DR
S THORNBURG
N LUCAS DR
E ALVIN AV
DRIVEWAY
S MC CLELLAND
S DEPOT
W SONYA LN
E ST
E MC ELHANY AV
N WESTERN AV
N RUSSELL AV
E HERMOSA
N DEJOY
E MILL
DAHLIA PL N VINE
S EAST AV
N BENWILEY
E CRESTON
DRIVEWAY
UNNAMED
N SCHOOL
E WILLIAMS
E JEWEL
N MARY DR
W TUNNELL
W CHURCH
N SCHOOL
W WILLIAMS
E TUNNELL
ALLEY
E BETTERAVIA RD
S BRADLEY RD
UNNAMED
ASH AV
N CONCORD AV
S AIRPARK DR
COUNTRY HILL RD
N VINE
S NICHOLSON AV
N BAY AV
E PLAZA DR
S LINCOLN
S ADAM WY
E JONES
E BOONE
W COX LN
ALLEY
N BRADLEY RD
E JONES
E MAIN
N PINE
N LINCOLN
DRIVEWAY
N DEJOY
W SONYA LN
ORCUTT RD
E JEWEL
N DEJOY
ALLEY
N BENWILEY
S BRADLEY RD
S WESTERN AV
N CURRYER
S SMITH N DEPOT
W SUNSET AV
E SUNSET AV
E BATTLES RD
W ORCHARD
E CHURCH
E ENOS DR
W ORANGE
W ORANGE
N PINE
S BRADLEY RD
S THORNBURG
E OAK
S CURRYER
ALLEY
N OXFORD AV
N LINCOLN
S BLOSSER RD
S EAST AV
E DONOVAN RD
ALLEY
00 0.2 .4 0.8
Miles ± Santa Maria Demands per
Account by Zoning
Legend
Water Service Area
TAZ_02_06_2009
Water Mains
Meters Types
Standard Meter
(Õ Landscape Meter
!@ Specific Plan
O Null Zoning Category
Meter Usage Scale (gpd)
0-492
492-891
891-13,234
13,234-29,162
29,162-61,691
61,691-206,577
Meter Zoning Categories
R-1
R-2
R-3
RMH
RSL-1
C-1
C-2
CC
CM
CPO
HC
FS
M-1
M-2
AS-II
OS
PF
SP
Date: 2/3/2015 Path: W:\GIS\Camarillo\Spatially_Allocated_Demands_Plot_22x34.mxd City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Appendix B
Appendix B. City of Santa Maria TAZ Buildout Analysis Spreadsheet INST.
Land Use Ave. FAR 800 sf GP
Intensity Vacant 1,900 1,000 1,200 1,500 0.25 0.25 0.25 0.30 0.10 0.25 0.20 0.20 0.10 0.10 per du LUE SEQ TAZ# DU SF Factor Acres TAZ# Demand Loading Acres R-1 R-2 R-3 RSL-1 C-1 C-2 CC CPO FS** M-1 M-2 CM AS-II PF (Use C-2) (Use R-3) Class 7 7 27,000 0.25 2.48 7 2.479338843 0-5 YRS 2 CC
29 27 120 4.00 36.00 27 30.96 0-5 YRS 31 LWDR-434 32 31,500 0.20 3.62 32 3.615702479 0-5 YRS 3.61570248 GI40 34 40 22.00 1.36 34 1.36 0-5 YRS 1.36 HDR-2241 34 89,298 0.25 8.20 34 7.052 0-5 YRS 7 CC52 43 296,500 0.10 68.07 43 58.53733333 0-5 YRS 58.53733 CF57 47 16 22.00 0.50 47 0.5 0-5 YRS 0.5 HDR-2259 47 49,000 0.25 4.00 47 4 0-5 YRS 4 CC60 47 17,000 0.20 1.95 47 1.951331497 0-5 YRS 1.951331 HCM71 58 296 4.63 63.93 58 54.9798 0-5 YRS 55 LDR-579 60 60 32.43 1.85 60 1.85 0-5 YRS 1.85 HDR-2280 70 138 22.00 6.28 70 6.28 0-5 YRS 6.28 HDR-2281 70 65,340 0.30 5.00 70 5 0-5 YRS 5 CPO85 81 252 12.00 29.00 81 24.94 0-5 YRS 24.94 MDR-1287 82 203 22.00 9.23 82 7.935454545 0-5 YRS 7.94 HDR-2288 82 112 22.00 5.09 82 5.090909091 0-5 YRS 5.09 HDR-2289 82 93 5.00 31.00 82 26.66 0-5 YRS 26.7 LDR-593 84 6 12.00 0.50 84 0.5 0-5 YRS 0.5 MDR-1397 85 80,900 0.31 6.00 85 6 0-5 YRS 6 CC 107 96 100,000 0.25 9.18 96 7.897095799 0-5 YRS 7.8970958 LI112 101 125 22.00 8.00 101 8 0-5 YRS 8 HDR-22118 104 27,700 0.25 2.54 104 2.543617998 0-5 YRS 3 CC119 104 25,225 0.12 4.67 104 4.67 0-5 YRS 4.67 FS130 111 6,307 0.20 4.20 111 4.2 0-5 YRS 4.2 CF132 113 21 22.00 3.23 113 3.23 0-5 YRS 3.23 HDR-22 1 28 8.00 1.00 21 5-10 YRS 1 LMDR-82 2 12,200 0.10 2.80 2 2.8 5-10 YRS 2.8 CF3 4 174 5.00 34.90 4 30.014 5-10 YRS 30 LDR-54 4 165,297 0.33 11.50 4 9.89 5-10 YRS 10 CC5 5 21,780 0.10 5.00 55 5-10 YRS 5 FS6 7 71,000 0.25 6.52 7 6.519742883 5-10 YRS 7 CC8 8 43,550 0.25 4.00 84 5-10 YRS 4 CC9 8 43,550 0.25 4.00 84 5-10 YRS 4 LI 10 8 60,980 0.20 7.00 87 5-10 YRS 7 HCM11 9 132 22.00 6.00 96 5-10 YRS 6 HDR-2212 9 315,800 0.25 29.00 9 24.94 5-10 YRS 25 CC13 9 4,360 0.10 1.00 91 5-10 YRS 1 FS14 10 6,540 0.30 0.50 10 0.5 5-10 YRS 0.5 CPO15 10 10,900 0.25 1.00 10 1 5-10 YRS 1 CC16 17 16 22.00 0.75 17 0.75 5-10 YRS 0.75 HDR-2219 22 9 22.00 0.44 22 0.44 5-10 YRS 0.44 HDR-2220 22 22 0.35 1.88 22 1.88 5-10 YRS 1.88 CD-220 22 28,665 0.35 1.88 22 1.88 5-10 YRS 2 CD-221 22 4,800 0.20 0.55 22 0.55 5-10 YRS 0.55 HCM22 22 7,410 0.10 1.70 22 1.7 5-10 YRS 1.7 CF27 25 7,830 0.30 0.60 25 0.6 5-10 YRS 0.6 1 CPO28 26 1,710 0.30 0.13 26 0.13 5-10 YRS 0.13 CPO30 27 43,550 0.25 4.00 27 4 5-10 YRS 4 CC39 34 39 22.00 1.77 34 1.772727273 5-10 YRS 1.77 HDR-2247 37 6 12.00 0.50 37 0.5 5-10 YRS 0.5 MDR-1249 37 9,810 0.30 0.75 37 0.75 5-10 YRS 0.75 CPO50 38 4 4.00 1.00 38 1 5-10 YRS 1 LWDR-4
RESIDENTIALDISTRICTS COMMERCIAL DISTRICTS INDUSTRIAL DISTRICTS DOWNTOWN Average sf/du Average FAR applied to acreage in the zone Average FAR applied to acreage in the zone INPUTS
Timeline
51 38 6,525 0.25 0.60 38 0.6 5-10 YRS 1 CC
53 43 296,500 0.10 68.07 43 58.53733333 5-10 YRS 58.53733 CF61 47 43,996 0.20 5.05 47 5.05 5-10 YRS 5.05 HCM64 49 17 5.00 3.50 49 3.5 5-10 YRS 3.5 LDR-565 49 27 0.35 2.26 49 2.26 5-10 YRS 2.26 CD-265 49 34,440 0.35 2.26 49 2.26 5-10 YRS 2 CD-266 49 60,980 0.10 14.00 49 12.04 5-10 YRS 12.04 CF67 50 34,850 0.10 8.00 50 8 5-10 YRS 8 CF69 56 435,600 0.20 50.00 56 43 5-10 YRS 43 HCM70 57 435,600 0.20 50.00 57 43 5-10 YRS 43 HCM72 58 304,920 0.20 35.00 58 30.1 5-10 YRS 30.1 GI73 58 152,900 0.20 17.55 58 15.093 5-10 YRS 15.093 NC74 59 180 22.00 8.19 59 7.0434 5-10 YRS 7.04 HDR-2275 59 215 12.00 17.94 59 15.4284 5-10 YRS 15.4284 MDR-1276 59 584 8.00 73.05 59 62.823 5-10 YRS 62.823 LMDR-877 59 135,460 0.20 15.55 59 13.373 5-10 YRS 13.373 NC82 71 87,125 0.25 8.00 71 8 5-10 YRS 8 CC83 71 30,490 0.10 7.00 71 7 5-10 YRS 7 CF90 82 71,480 0.10 16.41 82 14.1126 5-10 YRS 14.1126 CF91 83 8 12.00 0.76 83 0.76 5-10 YRS 0.76 MDR-1292 84 114 12.00 9.50 84 8.17 5-10 YRS 8.17 MDR-1296 85 78,408 0.10 18.00 85 15.48 5-10 YRS 15 CC98 85 326,700 0.25 30.00 85 25.8 5-10 YRS 26 CC 101 94 5 0.00 5.23 94 5.230792329 5-10 YRS 5 AREA 9102 95 78,400 0.20 9.00 95 7.74 5-10 YRS 7.74 HCM103 95 37,540 0.20 4.31 95 4.31 5-10 YRS 4.31 NC106 96 586,075 0.25 53.82 96 46.2829042 5-10 YRS 46.282904 LI116 103 25,710 0.30 1.97 103 1.966942149 5-10 YRS 1.966942 CPO131 112 81,975 0.25 12.00 112 10.32 5-10 YRS 10.32 LI133 114 65,350 0.25 6.00 114 6 5-10 YRS 6 CC134 115 70 22.00 7.23 115 7.23 5-10 YRS 7.23 HDR-22141 129 10 4.00 2.50 129 2.5 5-10 YRS 2.5 LWDR-4142 129 239,575 0.25 22.00 129 18.92 5-10 YRS 19 CC 17 20 30,500 0.20 3.50 20 3.5 BO 3.5 HCM18 21 2 5.00 0.50 21 0.5 BO 0.5 LDR-523 23 657,090 0.35 43.10 23 37.066 BO 37.066 CD-223 23 517 0.35 43.10 23 37.066 BO 37.066 CD-224 24 598,255 0.35 39.24 24 33.7464 BO 33.7464 CD-224 24 471 0.35 39.24 24 33.7464 BO 33.7464 CD-225 25 7 22.00 0.32 25 0.32 BO 0.32 HDR-2226 25 7 0.35 7.39 25 7.39 BO 7.39 CD-231 32 141,570 0.25 13.00 32 11.18 BO 11 CC32 32 43,560 0.25 4.00 32 4 BO 4 LI33 32 249,820 0.20 28.68 32 24.66083563 BO 24.6608356 GI35 32 113,260 0.20 13.00 32 11.18 BO 11.18 HCM36 33 12 12.00 1.00 33 1 BO 1 MDR-1237 33 19 0.35 1.63 33 1.63 BO 1.63 CD-237 33 24,850 0.35 1.63 33 1.63 BO 2 CD-238 33 8,720 0.20 1.00 33 1 BO 1 HCM42 35 5 22.00 0.25 35 0.25 BO 0.25 HDR-2243 35 791,105 0.35 51.89 35 44.6254 BO 44.6254 CD-243 35 622 0.35 51.89 35 44.6254 BO 44.6254 CD-244 35 6,540 0.20 0.75 35 0.75 BO 0.75 HCM45 36 565 0.35 47.09 36 40.4974 BO 40.4974 CD-245 36 717,920 0.35 47.09 36 40.4974 BO 40.4974 CD-246 36 457,380 0.35 30.00 36 25.8 BO 25.8 CD-1 48 37 497 0.35 9.13 37 7.849770432 BO 7.84977 CD-2
48 37 631,190 0.35 41.40 37 35.604 BO 35.604 CD-254 43 296,500 0.10 68.07 43 58.53733333 BO 58.53733 CF55 46 21,775 0.25 2.00 46 2 BO 2 CC56 46 21,780 0.20 2.50 46 2.5 BO 2.5 GI58 47 99 0.35 8.26 47 7.1036 BO 7.1 CD-258 47 125,930 0.35 8.26 47 7.1036 BO 7 CD-262 48 67 0.35 5.59 48 5.59 BO 5.59 CD-262 48 85,225 0.35 5.59 48 5.59 BO 6 CD-263 48 16,765 0.35 1.10 48 1.1 BO 1.1 CD-168 55-57 109 0.00 223.76 55 108.9692892 BO 108.96929 AREA 968 55-57 39 0.00 223.76 56 38.88222364 BO 38.8822236 AREA 968 55-57 45 0.00 223.76 57 44.57834558 BO 44.57835 AREA 978 59 90,080 0.10 20.68 59 17.7848 BO 17.7848 CF84 76-80 550 #VALUE! #VALUE! 494.38 76 425.1707593 BO 425.171 AREA 984 76-80 118 0.00 494.38 77 118.4721794 BO 118.4722 AREA 984 76-80 #VALUE! #VALUE! 494.38 78 173.68 BO 173.67745 AREA 984 76-80 #VALUE! #VALUE! 494.38 79 61.97 BO 61.9712703 AREA 984 76-80 #VALUE! #VALUE! 494.38 80 71.05 BO 71.04986 AREA 986 82 389 22.00 17.68 82 15.20636364 BO 15.2 HDR-2294 85 298 12.00 24.87 85 21.3882 BO 21.3882 MDR-1295 85 93 5.00 18.58 85 15.9788 BO 16 LDR-599 85 326,700 0.25 30.00 85 25.8 BO 26 CC 100 90-94 76 0.00 156.63 90 76.27850243 BO 76.278502 AREA 9100 90-94 27 0.00 156.63 91 27.21755655 BO 27.2175565 AREA 9100 90-94 31 0.00 156.63 92 31.2048419 BO 31.20484 AREA 9104 96 309 22.00 14.07 96 12.1002 BO 12.1 HDR-22105 96 54 12.00 4.50 96 4.5 BO 4.5 MDR-12108 96 62,625 0.25 5.75 96 5.75 BO 6 CC109 99 340,120 0.20 39.04 99 33.5744 BO 33.5744 HCM110 100 242,106 0.25 24.00 100 20.64 BO 20.64 LI111 100 62,178 0.20 18.00 100 15.48 BO 15.48 HCM113 101 71,005 0.30 5.43 101 5.4335 BO 5.4335 CPO114 101 54,450 0.25 5.00 101 5 BO 5 CC115 101 43,550 0.25 4.00 101 4 BO 4 LI117 103 13,500 0.30 1.03 103 1.033057851 BO 1.033058 CPO120 109 676 22.00 30.75 109 26.445 BO 26.4 HDR-22121 109 497 12.00 41.45 109 35.647 BO 35.647 MDR-12122 109 396 5.00 79.25 109 68.155 BO 68.2 LDR-5123 109 45,740 0.20 5.25 109 5.25 BO 5.25 NC124 109 84,330 0.10 19.36 109 16.6496 BO 16.6496 CF125 109 0.05 2.74 109 2.74 BO AOS-2126 109 0.00 104.69 109 90.0334 BO COS127 110 54,450 0.25 5.00 110 5 BO 5 LI128 110 2,613,600 0.10 600.00 110 516 BO 516 AS129 111 294,025 0.25 27.00 111 23.22 BO 23.22 LI135 115 16,325 0.25 1.50 115 1.5 BO 2 CC136 121 261,350 0.25 24.00 121 20.64 BO 20.64 LI137 124 55 22.00 2.50 124 2.5 BO 2.5 HDR-22138 124 56 4.00 14.00 124 12.04 BO 12 LWDR-4139 124 32,675 0.25 3.00 124 3 BO 3 CC140 124 34,850 0.10 8.00 124 8 BO 8 CF143 134 76 12.00 6.33 134 6.33 BO 6.33 MDR-12144 135 225,900 0.20 25.93 135 22.2998 BO 22 SP145 135 182,470 0.10 41.89 135 36.0254 BO 36.0254 AS 146 145 471,325 0.25 43.28 145 37.2208 BO 37.2208 LI
147 145 30,970 0.10 7.11 145 7.11 BO 7.11 AS148 146 809,125 0.25 74.30 146 63.898 BO 63.898 LI149 146 14,370 0.10 3.30 146 3.3 BO 3.3 AS150 147 523,375 0.25 48.06 147 41.3316 BO 41.3316 LI151 147 11,940 0.20 1.37 147 1.37 BO 1 SP152 147 53,580 0.10 12.30 147 10.578 BO 10.578 AS153 158 182,950 0.10 42.00 158 36.12 BO 36.12 CF Vacant areas include right-of-way
City of Santa Maria Utilities Capacity Study
Spatial Demand Allocation Methodology ‐ Final
2/3/2015 Appendix C
Appendix C. Spatially Allocated Projected Demands Map
See “Santa Maria Buildout Demands by Zoning” large scale map attached to this report. (!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
!@ !@
!@
!@
!@
!@!@ !@ !@
!@!@!@
!@
!@!@!@!@!@!@!@
!@!@!@!@!@!@!@
!@!@!@
!@!@ !@
!@
!@
!@
!@!@!@!@!@
!@!@!@
!@ !@!@ !@
!@
!@!@ !@!@!@!@
!@
(!Õ (!Õ
(!Õ
!@
!@
!@
!@ !@
!@
!@Õ !@
!@
!@!@
!@
!@
!@
!@
!@
(!Õ
(!Õ
(!Õ
!@ !@ !@
!@
!@
!@
!@ !@
!@
!@
!@ !@!@
!@
!@ !@
!@ !@ !@ !@
!@
!@
!@ !@Õ
!@!@!@ !@!@!@!@ !@ !@ !@
!@!@
!@!@ !@ !@
!@!@!@
!@!@
!@
!@ !@ !@!@!@ !@
!@
!@ !@ !@!@!@
!@!@
!@!@
!@
!@!@
!@
!@
!@
!@
!@ !@!@!@ !@
!@!@
!@
!@ !@
!@
!@!@!@
!@
!@ !@
!@
!@
!@
!@
!@!@ !@ !@
!@
!@
!@ !@!@
(!Õ
(!Õ (! (!Õ (!(!Õ (!Õ Õ (!Õ (!Õ Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
!@
!@
!@!@Õ
!@ !@!@!@!@ !@
!@
!@
!@
!@
!@ !@ !@!@ !@
!@ !@
!@!@
!@!@
!@
!@ !@
!@
!@
!@
!@
!@
!@!@!@!@ !@!@!@!@ !@ !@!@ !@ !@ !@
!@
!@
!@
!@
!@ !@ !@ !@
!@!@Õ !@ !@!@
!@
!@!@!@!@!@!@
!@ !@
!@
!@
!@
!@
(!Õ
(!Õ
(!Õ
(!Õ
!@
!@Õ
!@
(!Õ
(!(!ÕÕ (!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
!@
!@
(!Õ (!Õ
!@ !@!@!@
!@ !@Õ
!@ !@
!@
!@
!@
!@!@ !@
!@
(!Õ
!@
!@ !@ !@
!@!@ !@ !@!@!@!@
!@
!@!@
!@
!@
!@ !@ !@!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ !@!@Õ
!@
!@
!@!@!@!@
!@
(!Õ
!@
!@
!@ !@ !@!@ !@!@ !@
!@!@Õ
!@!@ !@ !@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ
!@
(!Õ
(!Õ
!@
!@
!@
!@
!@
!@
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ(!Õ
(!Õ (!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
O
(!Õ
!@
!@!@
!@
!@
!@
!@
!@
!@
!@
(!Õ
(!Õ
!@ !@
!@ !@!@
!@Õ
(!Õ
(!Õ
!@!@
!@!@
!@
!@
!@
!@
!@!@!@!@!@ !@ !@
!@ !@ !@!@ !@!@ !@!@
!@
!@
!@
!@
!@
!@
!@
!@
!@
!@!@
!@
!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(! (!Õ Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
!@
!@
(!Õ (!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!
(!Õ (!Õ Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ (!Õ (!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@ !@
!@
!@ !@
!@
!@
!@!@
!@!@
!@
(!Õ
!@
(!Õ (!Õ
(!Õ
(!Õ !@ !@ !@ !@
!@Õ
!@ !@
!@
!@ !@
!@
!@
!@
!@
!@ !@
(!Õ
(!Õ
(!Õ
!@!@
(!Õ
(!Õ (!Õ
(! (!Õ (!Õ Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
OO
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
!@
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!(!ÕÕ
O
(Õ
O(Õ
(Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ
(!Õ (!Õ (!Õ
(!Õ
(!(!ÕÕ
(!Õ
(!Õ
(!Õ
(!Õ
O
O O
O
O O O
OOO(ÕOO
O OOOOO
OOOOOO
OO OOO OO
O
(Õ
O
O O
O
O OO
O O
(Õ
O
O
O
(Õ
O
OO
O
O O
O (Õ
O
O O(Õ
OOO OO
OOOO (OOO OOO O
Õ
(OÕ
O
(!Õ
(!Õ
(Õ
!@
!@Õ !@!@
!@
!@!@Õ !@!@
!@!@Õ
!@
!@!@
!@
(!Õ
!@!@
(!Õ
!@ !@ !@ !@
!@
!@!@ !@
!@!@
!@!@
!@
!@
!@
!@!@
!@
(!Õ
(!Õ
(!Õ
(!Õ
!@!@
Õ
(!Õ
(!Õ
(!Õ
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#* #*
#* #*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#* #*
#*
#*
#
*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#* #*
#*
#* #*
#* #*
#*
#*
#*
#*
#*
#*
#* #*
#*
#*
#*
#*
#*
#*
#*
#*
* #*
#*
#*
#*
#*
#*#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#* #*
#* #*
#*
#*
#*
HWY 101
A
W MAIN
S MILLER
S BLACK RD
S COLLEGE DR
S BROADWAY
S DEPOT
W STOWELL RD
W BETTERAVIA RD
SKYWAY DR
N BLOSSER RD
E MAIN
N MILLER
N BROADWAY
N RAILROAD AV
HIGHWAY 135
S BRADLEY RD
PRELL RD
W COOK
ORCUTT RD
W MC COY LN
W CARMEN LN
E ST
W BATTLES RD
N SUEY RD
E FESLER
E JONES
ROSEMARY RD
S PINE
W TAYLOR
W FESLER
E FOSTER RD
E COOK
W ALVIN AV
W BOONE
MAHONEY RD
E CHAPEL
E MCCOY LN
S SMITH
N LINCOLN
HILLVIEW RD E BOONE
HANSON WY
E STOWELL RD
1ST ST
F DUTARD RD
E BETTERAVIA RD
E ALVIN AV
W CRESTON
W EL CAMINO E EL CAMINO
W FOSTER RD
W CHURCH
N PANTHER DR
E ORANGE
N THORNBURG
N COLLEGE DR
S BLOSSER RD
E BATTLES RD
E CYPRESS
N WESTERN AV
DRAKE DR
SUNRISE DR
W FAIRWAY DR
W MILL
W DONOVAN RD
FRONTAGE RD
E SEAWARD DR
W MORRISON AV
E PARK AV
MILES AV
S SANTA MARIA WY
S BRADLEY WY
BULL CANYON RD
N PREISKER LN
UNNAMED
N PINE
SANTA MARIA WY
LAKEVIEW DR
WINTER RD
N MARY DR
W HARDING AV
E GRANT W GRANT
W TAFT
INDUSTRIAL PY
W UNION VALLEY PY
W SONYA LN
PADEN ST
W POLK
W HIDDEN PINES WY
CARLOTTI DR
S LINCOLN
S SPEED
S RANCH
FOXENWOOD DR
S SUEY RD
PRIVATE
E TAFT
N DEJOY
W CHAPEL
E ENOS DR
E INGER DR
E DONOVAN RD
W ENOS DR
CLUBHOUSE DR
W LA BREA AV
S SCHOOL
N EAST AV
W PARK AV
SHIRLEY LN
S EAST AV
N LYNNE DR
N RUSSELL AV
N SCHOOL
JONES
E CAMINO COLEGIO
W WILLIAMS
DICKSON DR
W CANAL ST
W VIA ROSA
S OAKLEY AV
E MC ELHANY AV
E MARIPOSA WY
RAYMOND AV
UNION VALLEY PY
E CRESTON
W AGNES AV
WEST
AIRPARK DR
E CENTRAL AV
ANGELES RD
DAHLIA PL
MITCHELL RD
N BRADLEY RD
N BRIAN AV
NOVA
S WESTERN AV
E NEWLOVE DR
GAYLENE DR
E MILL
PRADINI WY
W MONROE
S DEL SUR
S BISCAYNE ST ALLEY
W BUNNY AV
S ELIZABETH
ESTES DR
LORENCITA DR
S BERRY LN
S RAILROAD AV
S SAN MIGUEL
RANCHO VERDE
E MONROE
SANDALWOOD DR
W BETHEL LN
LARK ST
W ATLANTIC PL
S THORNBURG
E SAN YSIDRO ST
S NICHOLSON AV
S RUSSELL AV
OLIVE DR
N PALISADE DR
FAIRMONT AV
S WALLIS AV
E LEE DR
W POPLAR
W WALLER LN
W MC ELHANY AV
S RUBEL WY
E OAK
HUMMEL DR
LANCASTER DR
LOS PADRES RD
N BENWILEY
OCOTILLO AV
SILER LN
S CONCEPCION AV
W TUNNELL
N CONCEPCION AV
WINSTON DR
N SMITH
SOUTHSIDE PKWY
MAJESTIC DR
W JONES
E TAYLOR
W SUNSET AV
W KNUDSEN WY
HARSIN LN
DRIVEWAY
S AIRPARK DR
PABST LN
TAMA LN
E MC CLOUD
E LEWIS RD
VIA ASUETO
N DEPOT
E SIERRA MADRE AV
NITA
W PROVANCE AV
LARCH AVE
W KINGSTON DR
MARIAN DR
N MAGELLAN DR
DOWNING LN
N STOKES AV
ALLEY CHAPEL MILL
W LEE DR
UNION VALLEY PK
N BARBARA
BROOKSIDE AVE
N CANYON DR
W DAL PORTO LN
CALIFORNIA BLVD
ALLEY MAIN CHAPEL
AUTO PARK DR
VIA RICO
N TEELYNN AV
N BENTLEY AV
E ROEMER WY
MARVIN ST
N VINE
E VICKIE AV
FOXENWOOD LN
LES MAISONS
N CESAR E. CHAVEZ
E COX LN
BERWYN DR
S MC CLELLAND
S PALISADE DR
VIA QUANTICO
TYLER DR
E DANIEL DR
N BONITA
CORAL DR
S BUNFILL DR
E JEWEL
E PLAZA DR
E BUNNY AV
FURUKAWA WY
N ELM AV
W ORCHARD S PERGOLA ST
E ORCHARD
W LIBERTY
SATINWOOD DR
ROBLE
N LAZO WY
FAIR OAKS DR
BANYAN WY
MILLSTONE AVE
E WALLER LN
W MARSALA AV
BLUE RIDGE DR
LUPIN LN
S WESTGATE RD
BERRYWOOD DR
ALLEY E COOK E ORANGE
W HAWTHORN
N ALISON AV
SEQUOIA DR
W CRAIG DR
E LAGUNA AV
COLEBROOK DR
MEREDITH LN
W FAIRWAY VISTA DR
E MONTEREY RD
W ELAINE AV
TIFFANY DR
AMBER LN
W LEMON
W MAYTEN
E ROSE AV
N SCOTT DR
ALLEY E CENTRAL E BOONE
WILSHIRE LN
PARKLAND DR
POPPY LN
N FIESTA WY
E SUNSET AV
SILVER LEAF DR
S ROD DR
E UNION VALLEY PY
W GUNNER
WHITE CT
LA SALLE DR
TERMINAL DR
N VIA CARRO
GOODWIN RD
W FRANK LN
WILDHAVEN CR
E JACKIE LN
S TRINITY DR
N ARRIBA WY
VIA HIELO
E ARCTIC AV
N WOODLAWN DR
CAMBRIDGE WY
WILLOWOOD RD
SAINT ANDREWS WY
SHEPARD DR
TOWNSEND LN
IRONWOOD DR
EMERALD DR
STANFORD RD
E ALCALA DR
MONTANO DR
TREE LINE DR
MORRO DR
N EASY ST
SAPPHIRE DR
E HAWKINS WY
GREENACRE DR
GARNET WY
E KOVAL LN
ELMWOOD DR
E WILLIAMS
W NEWLOVE DR
QUAIL MEADOWS DR
LOCH LOMOND
E TUNNELL
LILY LN
FELICIA DR
E STACY ANN TR
W ROBERT LN
E ROWLAND DR
N JOHNSON DR
HIGHWAY 1
S LINDA DR MELANIE CT
N ACACIA
W CHANNEL DR
N VIA ESTABLO
EVELYN CT
S ELLEN LN
JASMINE LN
HADLEY WY
S BARBARA
COURTNEY DR
S ELLIOT ST
S SCOTT DR
VINELAND DR
PINEWOOD DR
N DIVIDE WY
AMY WY
N MC CLELLAND
N LEXINGTON AV
S ROSITA AV
FLEMING LN
TEAKWOOD DR
E BILBAO DR
BRIDGEPORT RD
CAMERON AV
FLOWER ST
TURTLE CREEK DR
CAMBRIA AV
N LILAC
LAUREN LN
S CURRYER
BROADWAY ALLEY
ALLEY W MAIN W CHURCH
FERNDALE DR
HILLTOP RD
WOODLAND ST
W VISTA DEL RIO
ATHERLY LN
N EBONY
E LOUISA TR
LIGHTNING
W JEWEL
W COX LN
S SUPERIOR
MARILYN WY
S PAYTON WY
N SENECA
W HERMOSA
MARIOTT RD
N MARIAH DR
N GOLDEN DR
W PRAIRIE LN
W JILL
OAKWOOD DR
EAGLE CT
COUNTRY HILL RD
N CAT
STUBBS LN
S EL MIRLO
W EAGLETON AV
E SLOAN TR
W PERSHING
DARTMOUTH LN
W ROSE AV
E BORGES DR
S PARAISO ST
LEONA
MORNING RIDGE RD
S CURTIS CT
PREISKER PARK DR
PRIMROSE LN
E HARDING AV
S LA COSTA DR
E GILEA CT
SWALLOW ST
VIA RUBIO
PIERCE DR
HARRISON DR
RAMP S 101 MAIN
N BAY AV
ODIE LN
FARNEL RD
JODI CT
MURRAY DR
W TRIMERA AV
N SIGNAL AV
E EL NIDO CT
MON CHERE LN
N SUTTER
ANTONE LN
W VISTA MONTANA
S CAPITOL DR
S WALNUT DR
CYPRESS WY
W LOLITA LN
PIONEER DR
SHADYGLADE DR
KAMEO
W SHEILA LN
N LUCAS DR
E CHURCH
S HART DR
W CAMAROSA ST
REDWOOD AV S BONITA
MIRA LOMA DR
N RANCH
N OXFORD AV
WILLOW WALK WY
S BLUEBIRD ST
ALLEY E TUNNELL E EL CAMINO
S STARDUST DR
W DUVALI DR
GLENVIEW DR
BUCKSKIN DR
LARKSPUR DR
N VALERIE
OLIVEWOOD RD
E LAS FLORES WY
KINGS LN
W SILVERADO AV
CRILENE LN
BEDFORD PL
LINWOOD LN
N CURRYER
S CALDERON DR
DOLCETTO LN
W CAMINO COLEGIO
E AUTO PLAZA DR
E LAHR LN
E HANCOCK AV
N OAKLEY AV
S LUCAS DR
MARGIE AVE
ALLEY W FESLER W TUNNELL
VICTORIA PL
AVIATION WY
W VISTA DEL SOL
W ORANGE
DIXIELEE ST
BIRCH
VIA DE LA CRUZ
PARKVIEW NORTH
N MT WHITNEY WY
RAMP N 101 SANTA MARIA WY
S HASLAM DR
N RIVER ROCK CT
W WINDSOR
W PATTI LN
ALLEY E MILL E FESLER
CABALLERO LN
RAABERG WY
COOLEY LN
LINDALEE ST
N DARBETON AV
COTTAGE LN
TOPAZ WY
ALLEY W MILL W FESLER
E DENA WY
EVORA WAY
RAMP SANTA MARIA WY S 101
W BARRETT
STOWELL CNTR PZ
W MARIPOSA WY
DANIEL DR
FARRELL DR
CORSAIR CI
MOONDANCE
S CASELLI WY
S CALLE MIRASOL
VERONICA LN
LINDEMAN LN
RAYVILLE LN
E FIRE FOX DR
RAMP STOWELL N 101
W ROSEWOOD DR
E BARCELLUS AV
W CYPRESS
RUBY CT
E PLAYA BLANCA
S SANTILLAN AV
RAMP MAIN N 101
YALE PL
E HERMOSA
S EAGLE CT
ALLEY E DONOVAN E LEE
VIA YNEZ
E EVERGREEN AV
ALLEY MAIN CHURCH
ALLEY E HERMOSA E ALVIN
RAMP S 101 BROADWAY
N DEPOT DR
E JONATHAN PL
W HERMOSA DR
N HART DR SUNNYSIDE AVE
QUAIL RIDGE DR S OLYMPIA DR
E SKYLARK CT
MYRTLEWOOD RD
W LAS FLORES WY
HWY 135
S CENTERPOINTE PY
W RIMES CT
N KENSINGTON AV
CITATION CT
W TIMBER LN
W ELIZA RD
RAMP S 101 BETTERAVIA
DAKOTA DR
LA PURISIMA AV
E DOANE AV
SARA CT
S SORRENTO LN
AVILA WAY
N SUEY PARK DR
LIBERATOR
SWALLOW CT
W ROSCHELLE LN
E MCNEIL AV
SANDY CT
TERRACE AVE
WALLER PARK ROAD 7
ROEMER CT
W TAUNTON DR
E DE ARMOND PL
DRIFTWOOD DR
BAYLOR LN
REGAL DR
MALAGA WAY
W GINKGO CT
ALLEY S WESTERN S RUSSELL
E CROSSROADS LN
W SOMBRERO WY
RAIN TREE DR
ALLEY E MAIN E CHURCH
EDGEWOOD AVE
RAMP MAIN S 101
S FROSTY WY
ASPEN LN
E KATHRYN WY
E HENRY AV
COSSA
WENDY WAY
MT VERNON
SYCAMORE
S HIND PL
MICHELLE DR
TIERRA BRISAS DR
VALLEY OAK PL S STRATFORD AV
DE GAMA DR
THOMPSON WY
SWORD CT
NOBLE WY
BETTERAVIA RAMP S 101
ALLEY BROADWAY TARGET
VIA BELIZ
N CONCORD AV
LAVONNE DR
PVT (Casa Grande Mbl Est)
E TABITHA LN
BREEZY GLEN DR
N NAVARRA WY
E PORTLAND DR
HANGAR RD
RONALD PL
W ESSEX CT
RIDGE VIEW DR
E BENETTA DR
S COUNTRY CLB VILLGE DR
W WOOD MILL LN
ERIN CT
E VARNER CT
WILDWOOD RD
E PREMIER CT
E HARPER CT
S SAVOY DR
AMARONE LN
ASH AV
VENETO DR
SHELLIE CT
ALLEY W LEMON W BOONE
HAGERMAN (CITY OF SM)
GLENRIDGE LN
N KATHLEEN CT
FILAMINA
ALLEY SKYWAY THOMPSON
ALLEY S BROADWAY S McCLELLAND
ALLEY W ORANGE W LEMON
LESLEY CT
MARIE CT
E JONES E 101
W MENUSA CT
S FLORA WY
N ELIZABETH
N BICKNELL AV
RAMP S 101 DONOVAN
S CASTLEROCK LN
ASTER PL
ALLEY MAIN FESLER
S LASSEN DR
S ADLER CT
ALLEY N BROADWAY N McCLELLAND
W CENTURY
LOS PINOS CT
ALLEY S BROADWAY S THORNBURG
DAN CT
LELA LN
E COLUMBIA DR
N ROSALIND DR
BRISTOL CT
E FLOYD CT
DANIJAY WY
N CHRISTINA
S WEDGEWOOD DR
W HACIENDA WY
S KNIGHTBRIDGE DR
ALLEY MARY WESTERN
N WHITE DR
W BLANCHE CT
E LAKESIDE PY
E FORBES PL
RAMP DONOVAN N 101
PVT LA MARIA MBL HM PARK
E DEL NORTE
ALLEY S McCLELLAND S SPEED
LADD LN
MAGGIE LN
N DEJOY CT
E ALCAZAR DR
W ANTHONY PL
HIBISCUS CT
ALLEY W BLOSSER W FARMEL
S JAYE CT
E CALLE BONITA
E GREGORY CT
W ELM AV
E STOWELL RD W 101
ALLEY W COOK W ORANGE
ALLEY E CHAPEL E MILL
PAM CT
SMOKE TREE LN
COVERDALL
CABO SAN JOSE
N GUNDERSON LN
ALLEY E MAIN MILL
S ADAM WY
W JOY WY
GIBSON LN
SHADY LN
PINELAKE ST
S LONGDRIVE LN
S IRONRIDGE CT
TILIA ST
E MAMMOTH DR
OAKLEY CT
S WHITEDOVE DR
ALLEY W CHURCH W CYPRESS
RANCH
MABLE CT
N DONNER CT
GLEN LN
HUMMINGBIRD LN
VALENTINE CT
MONICA CT
W PASTORIA AV
E ROSE PL
N CHRISTINA
E BUNNY AV
S MC CLELLAND
ALLEY
N MARY DR
N BAY AV
N SMITH
UNNAMED
S AIRPARK DR
E PLAZA DR
N PINE
E JONES
N MARY DR
N CONCORD AV
N BENWILEY
N DEJOY
W SONYA LN
N VINE
ALLEY
E MC ELHANY AV
N MC CLELLAND
S DEPOT
W LEE DR
E MILL
S WESTERN AV
S THORNBURG
E CRESTON
E MAIN
N WESTERN AV
N CURRYER
W BOONE
W ORCHARD
N SCHOOL
ALLEY
E STOWELL RD
E TUNNELL
DRIVEWAY
W WILLIAMS
COUNTRY HILL RD
E BETTERAVIA RD S EAST AV
S NICHOLSON AV
N SCHOOL
N VINE
E JEWEL
S LINCOLN
S ADAM WY
ASH AV
S MC CLELLAND
E ALVIN AV
DAHLIA PL
W JEWEL
N LINCOLN
ORCUTT RD
N BRADLEY RD
DRIVEWAY
E JONES
E OAK
S CURRYER
N LINCOLN
N LUCAS DR
DRIVEWAY
N DEJOY
W SONYA LN
E JEWEL
N EAST AV
N DEJOY
W ORANGE
E ST
S BRADLEY RD
S SMITH
W CHURCH
S BRADLEY RD
UNNAMED
N DEPOT
E SUNSET AV
N LINCOLN
E WILLIAMS
W SUNSET AV
S BLOSSER RD
N LUCAS DR
E HERMOSA
N CURRYER
E ENOS DR
N OAKLEY AV
W ORANGE
ALLEY
N PINE
S BRADLEY RD
S THORNBURG
N BENWILEY
ALLEY
E CHURCH
E BOONE
E BATTLES RD
ALLEY
E DONOVAN RD
ALLEY
00 0.2 .4 0.8
Miles ± Santa Maria Buildout Demands by Zoning
Legend
Water Service Area
Sphere of Influence
TAZ Boundaries
Water Mains
Projected Usage Scale (gpd)
TotalUsage
* 0-11,750
* 11,750-36,150
* 36,150-75,035
* 75,035-141,163
* 141,163-343,569
*343,569-1,360,546
NCSD Turnout Demand
2,592,000
Meters Types
Standard Meter
(Õ Landscape Meter
!@ Specific Plan
O Null Zoning Category
Meter Usage Scale (gpd)
0-492
492-891
891-13,234
13,234-29,162
29,162-61,691
61,691-206,577
Zoning Categories
R-1
R-2
R-3
RMH
RSL-1
C-1
C-2
CC
CM
CPO
HC
FS
M-1
M-2
AS-II
OS
PF
SP
Date: 2/3/2015 Path: W:\GIS\CSM\UtilityMasterPlanUpdate_2012\Spatially_Allocated_Demands_BO_Plot_22x34.mxd City of Santa Maria Appendix B Utilities Capacity Study
B
FLOW MONITORING LOCATION MAPS
!(
!(
!( !( !( !(
!( !( !(
!(
!(
!(
!(
!( !(
!( !( !( !(
!(
!(
!(
!(
!(
!(
!( !(
!(
!( !(
!(
!(
!(
!(
!(
!( !(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !(
!( !(
!( !(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !( !( !(
!(
!(
!(
!(
!(
!( !( !( !(
!(
!(
!(
!(
!(
L 3-C
L 3-B
L 3-D M 3-D
L 3-A M 3-A 8
30 12
15 18
6 15
8 8
8 8 6
8 15
8 8
15 8
8 8
8 8
8 8
12 15
30 8
8 12
30 8
15 6
8 8
12 8
6 15
6 8
15 8
8 15
12 8
8 12
15 12
6 8
8 12
8 15
8 8
15 6
6 8
12 6
12 15
8 8
8 15 15
8 6
15 8
18 6 8
8 15
8 8
8 30
15 8
8 15
8 8
8 8
12 30
15 8
8 12
8 8
15 8
15 6
W TAYLOR
N WESTERN AV
N BLOSSER RD
GAYLENE DR
N DEJOY
W COX LN
W JEWEL
N LAZO WY
N DEJOY
W JEWEL
12 12
8 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02 0.04 0.08
Miles
Name: Flow Monitoring Location No. 1a_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 1
(N Blosser Rd)
30" Diameter
(15" Abandoned)
!(
!(
!(
!(
!(
J 5-C !( K 5-D
J 6-B
J 5-B
K 6-A
K 5-A
J 5-D
J 6-A
J 5-A
27 30
30 30
27 30
30 30
S BLACK RD
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02250.045 0.09
Miles
Name: Flow Monitoring Location No. 2a_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 2
(At Plant)
30" Diameter
!( !( !( !( !(
!(
!(!( !(
!(
!(
!(
!( !( !(
K 6-C L 6-D
K 7-B L 7-A
K 6-B L 6-A
30 21
15 21
15 15
21 21
30 21
21 30
30 15
W STOWELL RD
A
E ST
W LA BREA AV
HANSON WY
21 15
8 12
30 15
Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02250.045 0.09
Miles
Name: Flow Monitoring Location No. 3a_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 3
(W Stowell Rd)
30" Diameter
!(
!(
!( !(
!( !(
!( !(
!(
!(
!(
!(
!(
!( !( !( !(
!( !(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!( !(
L 8-A L 8-B
L 7-D L 7-C
24 6
12 8
6 6
24 24
8 12
12 6
6 8
6 8
6 12
12 24
12 6
8 6
6 6
8 6
24 6
6 6
6 6
6 6
6 8
6 24
6 6
6 6 6
6 6
6 12
6 12
8 A
W BETTERAVIA RD
W CARMEN LN
W VIA ROSA
S BLOSSER RD
W BETHEL LN
S WESTGATE RD
1ST ST
S TRINITY DR
S ROSITA AV
DRIVEWAY
W TRIMERA AV
W CAMAROSA ST
S YBARRA AV
S CALLE MIRASOL
S PASEO PALMILLA
W CALLE MARGARITA
W VIA ARBOLITOS
S BERRY LN
W CALLE LAURELES
S LAS POSAS AVE
S REGINA CT
W SABRINA CT
DRIVEWAY
8 8
10 8
88 24
8 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02 0.04 0.08
Miles
Name: Flow Monitoring Location No. 4_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 4
(A St)
24" Diameter
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
L 7-D
L 7-A
L 7-C
L 7-B
21 27
15 24
6 18
8 18
21 8
21 8
6 6
24 21
27 15
27 18
6 6
21 27
18 8
A
W BATTLES RD
S BLOSSER RD
W BETHEL LN
S WESTGATE RD
W SONYA LN
W MARSALA AV
UNNAMED
DOLCETTO LN
CHIANTI LN
S TROPEA AV
S SANTILLAN AV
S ROSITA AV
S ALHAMBRA AV
S SORRENTO LN
BAROLO PL
W AVOLA AV
W LE RIDA AV
DRIVEWAY
AMARONE LN
W ALMERIA AV
S VALONIA LN
W CAMAROSA ST
S CETONA LN
S YBARRA AV
S CONCHITA AV
W PASTORIA AV
W SABRINA CT
W BUNCH CT
S SIENA LN
DRIVEWAY
DRIVEWAY
30 12
10 12
15 15
18 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02 0.04 0.08
Miles
Name: Flow Monitoring Location No. 5a_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 5
(W Sonya Ln)
21" Diameter
!(
!(
!(
!(
!(
!(
!( !(
!(
!(!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!( !(
!(
!( !( !( !( !(
!( !(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(!( !( !(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!( !(
!( !(
!(
!(
!(
!( !(
!(
!(
!( !(
L 6-B
L 6-C
L 6-A M 6-A
L 6-D M 6-D
6 8
15 10
24 12
8 12
6 6
6 15
12 8
6 12
6 8
6 6
15 6
24 12
12 8
6 6
24 15
6 6
10 6
6 6
12 6
12 10
6 6
12 24
24 12
24 12
12 8
6 12
8 8
12 12
6 6
12 6
6 6
6 6 6
8 6 6
8 12
6 6
6 15 15
12 6
6 15
6 8
12 6
12 PRIVATE
S BLOSSER RD
S WESTERN AV
W MORRISON AV
FURUKAWA WY
W LIBERTY
S RUSSELL AV
W CRAIG DR
W JILL
W PERSHING
KAMEO
W LAS FLORES WY
ALLEY
W LIBERTY
W PERSHING
10 24 1212
15 12
12 15
12 12
12 6
12 Source: Esri, i-cubed, USDA, USGS, AEX, GeoEye, Getmapping, Aerogrid, IGN, IGP, and the GIS User Community
0 0.01250.025 0.05 0.075
Miles
Legend
Sewer Basins
Blosser Basin
Cook-Orange Basin
Enos Basin
Fesler Basin
Inger Basin
McCoy Basin
McElhaney Basin
Morrison Basin
SE_PIPES
DIAMETER
0 1 - 8
9 - 12
13 - 21
22 - 30
Atlas_Grid
± 0 0.02 0.04 0.08
Miles
Name: Flow Monitoring Location No. 6a_CSM Date: 2/4/2015 City of Santa Maria
Utilities Capacity Study
Wastewater System Monitoring Locations
Flow Monitoring
Location No. 6
(W Knudsen Way)
15" Diameter
City of Santa Maria Appendix C Utilities Capacity Study
C
SEWAGE FLOW PEAKING FACTOR CALCULATIONS
Sewage Flow Peaking Factors
Textbook Peak Hour Wet Weather Flow Methods
There are several methods available for estimating peak sewage flows using empirical formulas. For the City of Santa Maria each of these equations resulted in a peaking factor of about 2.0 times the average annual flow.
Method Peaking Factor1
Babbitt 1.99
Harmon 2.00
Ten States Standard 2.00
Babbitt Method
Qpeaked = Qbase൭ ହ
ቀ ು
భబబబቁ
.మ൱
P = Population
Q = Flow
Source:
Babbitt, H.E. and E.R. Baumann, Sewerage and Sewage Treatment, John Wiley & Sons Inc., New York, NY, 1958
Link: http://www.innovyze.com/bookstore/cscsa/Chap2dload.pdf Harmon Method
Qpeaked = 1 +
ଵସ
ସା√
P = Population
Q = Flow
Source:
Emad H. Imam, Haitham Y. Elnakar, Design flow factors for sewerage systems in small arid communities, Journal of Advanced Research, Available online 4 July 2013, ISSN 2090‐1232, http://dx.doi.org/10.1016/j.jare.2013.06.011.
Link: http://www.sciencedirect.com/science/article/pii/S2090123213000908
1 Calculated based on a population of 100,277
Ten States Standard
ொ
ொ௦
=
ଵ଼ା √
ସା √
P= Population
Q= Flow
Source:
"A Report of the Wastewater Committee of the Great Lakes." Recommended Standards for Wastewater Facilities: SECTION 370.APPENDIX D. Web. 1 Jan. 2014.
Link:
http://www.dwsd.org/downloads_n/about_dwsd/masterplan_wastewater/volume1/Evaluation_of_Coll ection_System_Design_Standards.pdf
City of Santa Maria Appendix D Utilities Capacity Study
D
RECOMMENDED WATER DISTRIBUTION SYSTEM CAPITAL
PROJECTS
N Broadway Water Main-8" PVC
N McClelland Street Water Main-12" PVC South Airport Water Main-8" PVC Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
City of Santa Maria
Utilities Capacity Study
Water System CIP
±
Legend
Water Pipeline CIP
System Pipelines
00 0.45 .9
Miles
Name: Water_CIP_RipnRun_v4 Date: 2/4/2015
Project: A
N Broadway Water Main Upgrade
A
Utilities Capacity Study Capital Project Descriptions
1 City of Santa Maria
Construction (Months): 5
Project Development (Months): 6
Need for Project:
The existng 8 in Cast Iron main is old, at the end of its service life, and has maintenance issues. The main is located on a major street.
Alternatives:
No major alternative identified for this project.
Recommended Solution:
It is recommended that the lines be replaced with a 8 in PVC line. Recommended project is approximately 2370 ft of 8 in PVC pipeline with new water services. See next page for map of project location.
Opinion of Total Project Cost: $621,600
2/4/2015 A‐1‐1
Project: A
N Broadway Water Main Upgrade
A
Utilities Capacity Study Capital Project Descriptions
1 City of Santa Maria
2/4/2015 A‐1‐2
Project: A
N Broadway Water Main Upgrade
A
Utilities Capacity Study Capital Project Descriptions
1 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $497,294
Mobilization $10,039
Insurance $10,039
Survey 1% $3,346
Site Clearing 1% $3,346
SWPPP (per LF) $2 $4,734
Traffic Control (per LF) $28 $66,276
Subtotal $432,429
Construction Contingency $64,865
Project Development $74,594
Construction Phase $49,728
Project Cost $621,616
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1095 S.Y. $9.61 $10,523
Hauling Pavement 154 $6.45 L.C.Y. $993
Pavement Repair 1095 $64.08 S.Y. $70,168
Shoring 14202 SF Wall $0.68 $9,657
Excavation‐Trench 570 B.C.Y. $7.65 $4,361
Pipe Bedding (sand import) 347 L.C.Y. $32.82 $11,389
Bedding Compaction 347 E.C.Y. $3.66 $1,270
Native Backfill & Compaction 223 $4.23 E.C.Y. $943
Water Compaction 223 $2.48 E.C.Y. $553
Hauling Excavation 1372 $4.98 B.C.Y. $6,833
Abandon Existing Main In Place 2367 $2.00 L.F. $4,734
Unaccounted‐for Items $14,487
Utility Conflict Resolution $30,423
8" PVC Pressure Pipe AWWA C900 2367 $19.49 L.F. $46,133 8" Gate Valve 27 Ea. $2,401.40 $64,838
8" Tee 6 $1,510.63 Ea. $9,064
Pipeline Testing and Disinfection 2367 L.F. $0.50 $1,184 8" Cross 2 $1,787.16 Ea. $3,574
1" Copper Service Line 625 $14.35 L.F. $8,969
New Utility Box 25 Ea. $828.90 $20,723
Saddle & Tap for Service 25 Ea. $553.28 $13,832
2/4/2015 A‐1‐3
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
2/4/2015
Project: A‐2
2,000 gpm Potable Well
Design and Permitting (Months): 14 Opinion of Total Project Cost: $3,442,800 Construction (Months): 12
Need for Project:
As discussed in Section 3.4 of the Utility Capacity Study, WSC evaluated the City’s water production capacity and determined that additional production facilities are required to meet future Maximum Day Demand (MDD) with the State Water Project out of service.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 1 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
Table 1. Future Water Supply
Water Supply Sources Projected Water Supply by Year (acre‐feet) 2015 2020 2025 2030 2035
Groundwater1 34,392 34,277 34,161 34,161 34,045
State Water Project2 11,227 11,048 10,870 10,870 10,692 Total 45,619 45,325 45,031 45,031 44,737
1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP.
2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and buildout conditions:
(1) Meet buildout MDD with the largest well out of service and the SWP in service. (2) Meet buildout MDD with the SWP out of service and all the wells in service.
Table 2 shows the total production capacity available under both criteria.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
2/4/2015
Table 2. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (All wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service.
2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 3. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before buildout occurs (see Table 3).
Table 3. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning Timeframe MDD
(gpm)
Additional Capacity
Required, Incremental
(gpm)
Total Well Capacity
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm).
The analysis does not consider water rights, well siting, property acquisition, or hydrogeologic constraints.
Recommended Solution:
Drill and equipping one new well, with a production capacity of approximately 2,000‐gpm. The cost opinion is based on a 350‐hp well drilled to 700 ft bgs, with a pump setting at 250‐ft bgs and the pumped water surface at 200‐ft bgs.
Alternatives:
The City could offset demand with reclaimed water, or non‐potable use, or otherwise reduce system demands to delay or eliminate the need for a new well.
Wells could be established as part of an aquifer storage and recovery system instead of being purely potable water supply.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
2/4/2015
Budget Discussion:
Estimated costs for this project are as follows:
Construction Contingency (15%): $359,200
Construction Phase (10%): $275,400
Project Development (15%): $413,100
Construction Total: $2,754,200
Project Cost: $3,442,800
Client: City of Santa Maria
Project: Utilities Capacity Study
Number: A‐2 Prepared by: JLD
Description: Water Supply Well A‐2 Reviewed by: JHR
Date: 2/4/2015
Opinion of Probable Construction Cost
Line No Item Description Qty Unit Unit Price Cost
1 Well drilling contractor mobilization 1 LS 53,000$ $ 53,000 2 Drill 700 ft deep well 1 LS 268,000$ $ 268,000 3 Furnish and install 316 stainless steel well
screen, casing and appurtenance 1 LS 667,000$ $ 667,000 4 Well disinfection, testing, development 1 LS 130,000$ $ 130,000 5 Well equipping contractor mobilization 1 LS 62,000$ $ 62,000 6 350 HP vertical turbine pump and assemblies,
start‐up, testing, and disinfection 1 LS $ 287,000 $ 287,000 7 Site grading, 38' x 28' well pump building, and
related appurtenances 1 LS 307,000$ $ 307,000 8 Furnish and install VFD, MCC, and electrical
equipment 1 LS 446,000$ $ 446,000
9 Chloramination system 1 LS 61,000$ $ 61,000 10 Unaccounted for items (5% allowance) 1 LS 114,000$ $ 114,000 Subtotal 2,395,000 $
Construction Contingencies (15%) $ 359,250
Construction Total 2,754,250 $
Project Development (15%) 413,138 $
Construction Phase (10%) 275,425 $
Project Total Cost 3,442,813 $
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Project: B‐1
2,000 gpm Potable Well
Design and Permitting (Months): 14 Opinion of Total Project Cost: $3,442,800 Construction (Months): 12
Need for Project:
As discussed in Section 3.4 of the Utility Capacity Study, WSC evaluated the City’s water production capacity and determined that additional production facilities are required to meet future Maximum Day Demand (MDD) with the State Water Project out of service.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 1 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
Table 1. Future Water Supply
Water Supply Sources Projected Water Supply by Year (acre‐feet) 2015 2020 2025 2030 2035
Groundwater1 34,392 34,277 34,161 34,161 34,045
State Water Project2 11,227 11,048 10,870 10,870 10,692 Total 45,619 45,325 45,031 45,031 44,737
1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP.
2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and buildout conditions:
(1) Meet buildout MDD with the largest well out of service and the SWP in service. (2) Meet buildout MDD with the SWP out of service and all the wells in service.
Table 2 shows the total production capacity available under both criteria.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Table 2. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (All wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service.
2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 3. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before buildout occurs (see Table 3).
Table 3. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning Timeframe MDD
(gpm)
Additional Capacity
Required, Incremental
(gpm)
Total Well Capacity
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm).
The analysis does not consider water rights, well siting, property acquisition, or hydrogeologic constraints.
Recommended Solution:
Drill and equipping one new well, with a production capacity of approximately 2,000‐gpm. The cost opinion is based on a 350‐hp well drilled to 700 ft bgs, with a pump setting at 250‐ft bgs and the pumped water surface at 200‐ft bgs.
Alternatives:
The City could offset demand with reclaimed water, or non‐potable use, or otherwise reduce system demands to delay or eliminate the need for a new well.
Wells could be established as part of an aquifer storage and recovery system instead of being purely potable water supply.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Budget Discussion:
Estimated costs for this project are as follows:
Construction Contingency (15%): $359,200
Construction Phase (10%): $275,400
Project Development (15%): $413,100
Construction Total: $2,754,200
Project Cost: $3,442,800
Client: City of Santa Maria
Project: Utilities Capacity Study
Number: B‐1 Prepared by: JLD
Description: Water Supply Well B‐1 Reviewed by: JHR
Date: 7/9/2014
Opinion of Probable Construction Cost
Line No Item Description Qty Unit Unit Price Cost
1 Well drilling contractor mobilization 1 LS 53,000$ $ 53,000 2 Drill 700 ft deep well 1 LS 268,000$ $ 268,000 3 Furnish and install 316 stainless steel well
screen, casing and appurtenance 1 LS 667,000$ $ 667,000 4 Well disinfection, testing, development 1 LS 130,000$ $ 130,000 5 Well equipping contractor mobilization 1 LS 62,000$ $ 62,000 6 350 HP vertical turbine pump and assemblies,
start‐up, testing, and disinfection 1 LS 287,000 $ $ 287,000 7 Site grading, 38' x 28' well pump building, and
related appurtenances 1 LS 307,000$ $ 307,000 8 Furnish and install VFD, MCC, and electrical
equipment 1 LS 446,000$ $ 446,000
9 Chloramination system 1 LS 61,000$ $ 61,000 10 Unaccounted for items (5% allowance) 1 LS 114,000$ $ 114,000 Subtotal 2,395,000 $
Construction Contingencies (15%) $ 359,250
Construction Total $ 2,754,250
Project Development (15%) 413,138 $
Construction Phase (10%) 275,425 $
Project Total Cost 3,442,813 $
Project: B
South Airport Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
3 City of Santa Maria
Construction (Months): 6
Project Development (Months): 6
Need for Project:
The existing 8 in Cast Iron main is old, at the end of its service life, leaks, and has maintenance issues. Services are located in a field south of the airport.
Alternatives:
No major alternative identified for this project.
Recommended Solution:
It is recommended that the lines be replaced with a 8 in PVC line. Recommended project is approximately 2850 ft of 8 in PVC pipeline with new water services. See next page for map of project location.
Opinion of Total Project Cost: $542,500
2/4/2015 B‐3‐4
Project: B
South Airport Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
3 City of Santa Maria
2/4/2015 B‐3‐5
Project: B
South Airport Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
3 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $434,022
Mobilization $8,107
Insurance $8,107
Survey 1% $2,702
Site Clearing 1% $2,702
SWPPP (per LF) $2 $5,706
Traffic Control (per LF) $28 $79,884
Subtotal $377,411
Construction Contingency $56,611
Project Development $65,104
Construction Phase $43,401
Project Cost $542,527
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1321 S.Y. $9.61 $12,695
Hauling Pavement 184 $6.45 L.C.Y. $1,187
Pavement Repair 1321 $64.08 S.Y. $84,650
Shoring 17118 SF Wall $0.68 $11,640
Excavation‐Trench 686 B.C.Y. $7.65 $5,248
Pipe Bedding (sand import) 414 L.C.Y. $32.82 $13,587
Bedding Compaction 414 E.C.Y. $3.66 $1,515
Native Backfill & Compaction 272 $4.23 E.C.Y. $1,151
Water Compaction 272 $2.48 E.C.Y. $675
Hauling Excavation 1648 $4.98 B.C.Y. $8,207
Abandon Existing Main In Place 2853 $2.00 L.F. $5,706
Unaccounted‐for Items $11,697
Utility Conflict Resolution $24,564
8" PVC Pressure Pipe AWWA C900 2853 $19.49 L.F. $55,605 8" Gate Valve 9 Ea. $2,401.40 $21,613
8" Tee 3 $1,510.63 Ea. $4,532
8" 90 Bend 1 Ea. $1,024.06 $1,024
Pipeline Testing and Disinfection 2853 L.F. $0.50 $1,427 1" Copper Service Line 50 L.F. $14.35 $718
New Utility Box 2 Ea. $828.90 $1,658
Saddle & Tap for Service 2 Ea. $553.28 $1,107
2/4/2015 B‐3‐6
Project: B
N McClelland Street Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
4 City of Santa Maria
Construction (Months): 6
Project Development (Months): 6
Need for Project:
The existing 12 in Cast Iron main is old and at the end of its service life. The main has leaded joints and a history of breaks and leaks under houses.
Alternatives:
No major alternative identified for this project.
Recommended Solution:
It is recommended that the lines be replaced with a 12 in PVC line. Recommended project is approximately 2720 ft of 12 in PVC pipeline with new water services. See next page for map of project location.
Opinion of Total Project Cost: $966,500
2/4/2015 B‐4‐7
Project: B
N McClelland Street Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
4 City of Santa Maria
2/4/2015 B‐4‐8
Project: B
N McClelland Street Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
4 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $773,165
Mobilization $16,411
Insurance $16,411
Survey 1% $5,469
Site Clearing 1% $5,469
SWPPP (per LF) $2 $5,436
Traffic Control (per LF) $28 $76,104
Subtotal $672,317
Construction Contingency $100,848
Project Development $115,976
Construction Phase $77,316
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1361 S.Y. $9.61 $13,079
Hauling Pavement 190 $6.45 L.C.Y. $1,226
Pavement Repair 1361 $64.08 S.Y. $87,213
Shoring 16308 SF Wall $0.68 $11,089
Excavation‐Trench 757 B.C.Y. $7.65 $5,791
Pipe Bedding (sand import) 508 L.C.Y. $32.82 $16,673
Bedding Compaction 508 E.C.Y. $3.66 $1,859
Native Backfill & Compaction 249 $4.23 E.C.Y. $1,053
Water Compaction 249 $2.48 E.C.Y. $618
Hauling Excavation 1816 $4.98 B.C.Y. $9,044
Abandon Existing Main In Place‐B 2718 $3.50 L.F. $9,513 Unaccounted‐for Items $23,681
Utility Conflict Resolution $49,729
12" PVC Pressure Pipe AWWA C900 2718 L.F. $36.12 $98,174 12" Gate Valve 34 Ea. $3,007.65 $102,260
12" Tee 5 $2,718.19 Ea. $13,591
12" 90 Bend 2 $1,826.43 Ea. $3,653
Pipeline Testing and Disinfection 2718 L.F. $0.50 $1,359 12" Cross 9 Ea. $3,279.94 $29,519
1" Copper Service Line 975 $14.35 L.F. $13,991
New Utility Box 39 Ea. $828.90 $32,327
Saddle & Tap for Service 39 $553.28 Ea. $21,578
2/4/2015 B‐4‐9
Project: B
N McClelland Street Water Main Upgrade
B
Utilities Capacity Study Capital Project Descriptions
4 City of Santa Maria
Project Cost $966,457
2/4/2015 B‐4‐10
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Project: C‐1
2,000 gpm Potable Well
Design and Permitting (Months): 14 Opinion of Total Project Cost: $3,442,800 Construction (Months): 12
Need for Project:
As discussed in Section 3.4 of the Utility Capacity Study, WSC evaluated the City’s water production capacity and determined that additional production facilities are required to meet future Maximum Day Demand (MDD) with the State Water Project out of service.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 1 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
Table 1. Future Water Supply
Water Supply Sources Projected Water Supply by Year (acre‐feet) 2015 2020 2025 2030 2035
Groundwater1 34,392 34,277 34,161 34,161 34,045
State Water Project2 11,227 11,048 10,870 10,870 10,692 Total 45,619 45,325 45,031 45,031 44,737
1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP.
2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and buildout conditions:
(1) Meet buildout MDD with the largest well out of service and the SWP in service. (2) Meet buildout MDD with the SWP out of service and all the wells in service.
Table 2 shows the total production capacity available under both criteria.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Table 2. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (All wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service.
2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 3. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before buildout occurs (see Table 3).
Table 3. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning Timeframe MDD
(gpm)
Additional Capacity
Required, Incremental
(gpm)
Total Well Capacity
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm).
The analysis does not consider water rights, well siting, property acquisition, or hydrogeologic constraints.
Recommended Solution:
Drill and equipping one new well, with a production capacity of approximately 2,000‐gpm. The cost opinion is based on a 350‐hp well drilled to 700 ft bgs, with a pump setting at 250‐ft bgs and the pumped water surface at 200‐ft bgs.
Alternatives:
The City could offset demand with reclaimed water, or non‐potable use, or otherwise reduce system demands to delay or eliminate the need for a new well.
Wells could be established as part of an aquifer storage and recovery system instead of being purely potable water supply.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Budget Discussion:
Estimated costs for this project are as follows:
Construction Contingency (15%): $359,200
Construction Phase (10%): $275,400
Project Development (15%): $413,100
Construction Total: $2,754,200
Project Cost: $3,442,800
Client: City of Santa Maria
Project: Utilities Capacity Study
Number: C‐1 Prepared by: JLD
Description: Water Supply Well C‐1 Reviewed by: JHR
Date: 7/9/2014
Opinion of Probable Construction Cost
Line No Item Description Qty Unit Unit Price Cost
1 Well drilling contractor mobilization 1 LS 53,000$ $ 53,000 2 Drill 700 ft deep well 1 LS 268,000$ $ 268,000 3 Furnish and install 316 stainless steel well screen,
casing and appurtenance 1 LS 667,000$ $ 667,000 4 Well disinfection, testing, development 1 LS 130,000$ $ 130,000 5 Well equipping contractor mobilization 1 LS 62,000$ $ 62,000 6 350 HP vertical turbine pump and assemblies,
start‐up, testing, and disinfection 1 LS 287,000 $ $ 287,000 7 Site grading, 38' x 28' well pump building, and
related appurtenances 1 LS 307,000$ $ 307,000 8 Furnish and install VFD, MCC, and electrical
equipment 1 LS 446,000$ $ 446,000
9 Chloramination system 1 LS 61,000$ $ 61,000 10 Unaccounted for items (5% allowance) 1 LS 114,000$ $ 114,000 Subtotal 2,395,000 $
Construction Contingencies (15%) $ 359,250
Construction Total $ 2,754,250
Project Development (15%) 413,138 $
Construction Phase (10%) 275,425 $
Project Total Cost 3,442,813 $
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Project: C‐2
2,000 gpm Potable Well
Design and Permitting (Months): 14 Opinion of Total Project Cost: $3,442,800 Construction (Months): 12
Need for Project:
As discussed in Section 3.4 of the Utility Capacity Study, WSC evaluated the City’s water production capacity and determined that additional production facilities are required to meet future Maximum Day Demand (MDD) with the State Water Project out of service.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 1 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
Table 1. Future Water Supply
Water Supply Sources Projected Water Supply by Year (acre‐feet) 2015 2020 2025 2030 2035
Groundwater1 34,392 34,277 34,161 34,161 34,045
State Water Project2 11,227 11,048 10,870 10,870 10,692 Total 45,619 45,325 45,031 45,031 44,737
1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP.
2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and buildout conditions:
(1) Meet buildout MDD with the largest well out of service and the SWP in service. (2) Meet buildout MDD with the SWP out of service and all the wells in service.
Table 2 shows the total production capacity available under both criteria.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Table 2. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (All wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service.
2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 3. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before buildout occurs (see Table 3).
Table 3. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning Timeframe MDD
(gpm)
Additional Capacity
Required, Incremental
(gpm)
Total Well Capacity
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm).
The analysis does not consider water rights, well siting, property acquisition, or hydrogeologic constraints.
Recommended Solution:
Drill and equipping one new well, with a production capacity of approximately 2,000‐gpm. The cost opinion is based on a 350‐hp well drilled to 700 ft bgs, with a pump setting at 250‐ft bgs and the pumped water surface at 200‐ft bgs.
Alternatives:
The City could offset demand with reclaimed water, or non‐potable use, or otherwise reduce system demands to delay or eliminate the need for a new well.
Wells could be established as part of an aquifer storage and recovery system instead of being purely potable water supply.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Budget Discussion:
Estimated costs for this project are as follows:
Construction Contingency (15%): $359,200
Construction Phase (10%): $275,400
Project Development (15%): $413,100
Construction Total: $2,754,200
Project Cost: $3,442,800
Client: City of Santa Maria
Project: Utilities Capacity Study
Number: C‐2 Prepared by: JLD
Description: Water Supply Well C‐2 Reviewed by: JHR
Date: 7/9/2014
Opinion of Probable Construction Cost
Line No Item Description Qty Unit Unit Price Cost
1 Well drilling contractor mobilization 1 LS 53,000$ 53,000$ 2 Drill 700 ft deep well 1 LS 268,000$ 268,000$ 3 Furnish and install 316 stainless steel well screen,
casing and appurtenance 1 LS 667,000$ 667,000$ 4 Well disinfection, testing, development 1 LS 130,000$ 130,000$ 5 Well equipping contractor mobilization 1 LS 62,000$ 62,000$ 6 350 HP vertical turbine pump and assemblies, start‐
up, testing, and disinfection 1 LS $ 287,000 287,000$ 7 Site grading, 38' x 28' well pump building, and
related appurtenances 1 LS 307,000$ 307,000$
8 Furnish and install VFD, MCC, and electrical
equipment 1 LS 446,000$ 446,000$
9 Chloramination system 1 LS 61,000$ 61,000$ 10 Unaccounted for items (5% allowance) 1 LS 114,000$ 114,000$ Subtotal 2,395,000$
Construction Contingencies (15%) 359,250$
Construction Total 2,754,250$
Project Development (15%) 413,138$
Construction Phase (10%) 275,425$
Project Total Cost 3,442,813$
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Project: C‐3
2,000 gpm Potable Well
Design and Permitting (Months): 14 Opinion of Total Project Cost: $3,442,800 Construction (Months): 12
Need for Project:
As discussed in Section 3.4 of the Utility Capacity Study, WSC evaluated the City’s water production capacity and determined that additional production facilities are required to meet future Maximum Day Demand (MDD) with the State Water Project out of service.
The City has two primary water supply sources: (1) groundwater, and (2) the SWP. Table 1 presents the City’s anticipated future water supply through 2035, as reported in the City’s 2010 Urban Water Management Plan (UWMP).
Table1. Future Water Supply
Water Supply Sources Projected Water Supply by Year (acre‐feet) 2015 2020 2025 2030 2035
Groundwater1 34,392 34,277 34,161 34,161 34,045
State Water Project2 11,227 11,048 10,870 10,870 10,692 Total 45,619 45,325 45,031 45,031 44,737
1 Includes Groundwater from the Santa Maria Groundwater Basin, Twitchell Yield/Commingled Groundwater, and Return Flows from SWP Water. Source: 2010 UWMP.
2 Source: 2010 UWMP.
On an annual basis, the City’s projected supply sources are adequate to meet projected demands.
Therefore, this analysis focused on the system’s ability to meet demands during maximum day demand conditions.
WSC defined two criteria to evaluate if the City has sufficient production capacity to meet estimated MDD for 5‐Year, 10‐Year and buildout conditions:
(1) Meet buildout MDD with the largest well out of service and the SWP in service. (2) Meet buildout MDD with the SWP out of service and all the wells in service.
Table 2 shows the total production capacity available under both criteria.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Table 1. Criteria Used for Production Evaluation
Criteria Production (gpm)
SWP Wells Total
1. Largest well out of service (SWP in service)1 12,050 12,450 24,500
2. SWP out of service (All wells in service)2 0 14,950 14,950 1 Assumes maximum capacity at SWP turnout (26.85 cfs), and Well 10 (one of the largest wells) is out of service.
2 Assumes SWP is out of service and all wells are in service.
Criteria 2 is the controlling criteria for determining if additional production capacity is required since it results in the lowest available production capacity (14,950‐gpm); this value was compared to the MDD for current, 5‐Year, 10‐Year, and Buildout conditions, which are shown in Table 2. The City is unable to meet 5‐Year, 10‐Year, and Buildout MDD with a reliable production capacity of 14,950‐gpm. The City must add a total of 10,000‐gpm of well capacity to meet Buildout MDD; 2,000‐gpm must be added in the next 5 years, another 2,000‐gpm in the 5‐ to 10‐year timeframe, and another 6,000‐gpm of capacity before buildout occurs (see Table 2).
Table 2. Additional Capacity to Meet 5‐Year, 10‐Year, and Buildout MDD Planning Timeframe MDD
(gpm)
Additional Capacity
Required, Incremental
(gpm)
Total Well Capacity
(gpm)
Current 13,940 0 14,950
5‐Year1 15,749 2,000 16,950
10‐Year1 17,606 2,000 18,950
Buildout1 24,749 6,000 24,950
1 Includes obligations to NCSD (approx. 1,860 gpm).
The analysis does not consider water rights, well siting, property acquisition, or hydrogeologic constraints.
Recommended Solution:
Drill and equipping one new well, with a production capacity of approximately 2,000‐gpm. The cost opinion is based on a 350‐hp well drilled to 700 ft bgs, with a pump setting at 250‐ft bgs and the pumped water surface at 200‐ft bgs.
Alternatives:
The City could offset demand with reclaimed water, or non‐potable use, or otherwise reduce system demands to delay or eliminate the need for a new well.
Wells could be established as part of an aquifer storage and recovery system instead of being purely potable water supply.
City of Santa Maria Capital Project Descriptions
Utilities Capacity Study
7/9/2014
Budget Discussion:
Estimated costs for this project are as follows:
Construction Contingency (15%): $359,200
Construction Phase (10%): $275,400
Project Development (15%): $413,100
Construction Total: $2,754,200
Project Cost: $3,442,800
Client: City of Santa Maria
Project: Utilities Capacity Study
Number: C‐3 Prepared by: JLD
Description: Water Supply Well C‐3 Reviewed by: JHR
Date: 7/9/2014
Opinion of Probable Construction Cost
Line No Item Description Qty Unit Unit Price Cost
1 Well drilling contractor mobilization 1 LS 53,000$ 53,000$ 2 Drill 700 ft deep well 1 LS 268,000$ 268,000$ 3 Furnish and install 316 stainless steel well screen,
casing and appurtenance 1 LS 667,000$ 667,000$ 4 Well disinfection, testing, development 1 LS 130,000$ 130,000$ 5 Well equipping contractor mobilization 1 LS 62,000$ 62,000$ 6 350 HP vertical turbine pump and assemblies, start‐
up, testing, and disinfection 1 LS 287,000$ 287,000$ 7 Site grading, 38' x 28' well pump building, and
related appurtenances 1 LS 307,000$ 307,000$
8 Furnish and install VFD, MCC, and electrical
equipment 1 LS 446,000$ 446,000$
9 Chloramination system 1 LS 61,000$ 61,000$ 10 Unaccounted for items (5% allowance) 1 LS 114,000$ 114,000$ Subtotal 2,395,000$
Construction Contingencies (15%) 359,250$
Construction Total 2,754,250$
Project Development (15%) $ 413,138
Construction Phase (10%) 275,425$
Project Total Cost 3,442,813$
City of Santa Maria Appendix E Utilities Capacity Study
E
RECOMMENDED SEWER COLLECTION SYSTEM CAPITAL
PROJECTS
Project: A
Dejoy Phase II
A
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
Construction (Months): 10
Project Development (Months): 9
Need for Project:
Pipeline has inadequate capacity at Current Conditions. See table below for capacity information for each segment included in the project.
Alternatives:
Project: A) The City and design engineer should evaluate possible parallel construction options. Decreased pipe size could be feasible depending on condition and long term life cycle cost evaluation of maintaining two parallel trunk lines.
Evaluate in conjunction will all of the Main Street Trunk Main/Dejoy Phase II upgrade projects.
B) The City is evaluating the feasibility of re‐instating a parallel 14‐in main to defer the need for this project.
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 36 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 5540 ft of 36 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $3,866,200
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
27 SP01641‐K5B 674 4,796,730 5,286,771 5,380,384 5,738,174 7,231,012 36 10,330,355 27 SP02336‐J5C 592 3,991,121 5,286,771 5,380,384 5,738,174 7,231,012 36 8,595,375 27 SP02338‐J5C 491 15,342,616 5,286,771 5,380,384 5,738,174 7,231,012 36 33,042,232 27 SP01640‐K5Bb 433 940,716 5,286,771 5,380,384 5,738,174 7,231,012 36 2,025,949 30 SP01281‐K5A 993 4,132,139 5,286,771 5,380,384 5,738,174 7,231,012 36 6,719,313 30 SP01282‐K5A 1034 3,939,840 5,286,771 5,380,384 5,738,174 7,231,012 36 6,406,614 30 SP02346‐K5D 1196 3,737,660 5,286,771 5,380,384 5,738,174 7,231,012 36 6,077,848 30 SP01280‐K5A 120 14,741,531 5,286,771 5,380,384 5,738,174 7,231,012 36 23,971,354 2/3/2015 A‐1‐1
Project: A
Dejoy Phase II
A
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
2/3/2015 A‐1‐2
Project: A
Dejoy Phase II
A
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $3,092,939
Mobilization $70,094
Insurance $70,094
Survey 1% $23,365
Site Clearing 1% $23,365
SWPPP (per LF) $2 $11,074
Traffic Control (per LF) $28 $155,038
Subtotal $2,689,512
Construction Contingency $403,427
Project Development $463,941
Construction Phase $309,294
Project Cost $3,866,174
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 3999 S.Y. $9.63 $38,510
Hauling Pavement 555 $6.47 L.C.Y. $3,591
Pavement Repair 3999 $64.30 S.Y. $257,136
Shoring 80149 SF Wall $0.68 $54,501
Excavation‐Trench 6680 B.C.Y. $7.67 $51,236
Pipe Bedding (sand import) 3798 L.C.Y. $32.83 $124,688
Bedding Compaction 3798 E.C.Y. $3.67 $13,939
Native Backfill & Compaction 2882 $4.25 E.C.Y. $12,249
Water Compaction 2882 E.C.Y. $2.48 $7,147
Hauling Excavation 8016 $4.94 B.C.Y. $39,599
Abandon Existing Sewer In Place‐I 5538 $10.00 L.F. $55,380 36" ‐ PVC SDR 35 5538 $199.66 L.F. $1,105,717
Bypass Pumping‐ 36" ‐ Fixed Costs 37 Day $2,665.00 $98,605 Bypass Pumping‐ 36" ‐ Variable Costs 204871 L.F.‐Day $0.60 $122,923 New Manholes 16 Ea. $15,000.00 $240,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 24" Gravity Main 0 Ea. $4,616.84 $0 Unaccounted‐for Items $111,261
Segment Label Laterals Diam in Depth ft
SP01281‐K5A 0 36 6.7
SP01282‐K5A 0 36 6.5
SP01641‐K5B 0 36 6.5
SP02336‐J5C 0 36 7.7
SP02338‐J5C 0 36 9.0
SP02346‐K5D 0 36 7.5
SP01280‐K5A 0 36 5.8
SP01640‐K5Bb 0 36 8.4
2/3/2015 A‐1‐3
Project: A
Knudsen Way
A
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Current Conditions. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 18 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 660 ft of 18 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $257,200
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
15 SP01561‐L6B 12 877,500 576,891 583,891 622,221 732,952 18 1,426,911 15 SP02377‐L6B 321 877,500 744,126 751,126 789,456 900,188 18 1,426,911 15 SP02375‐L6B 328 734,169 744,127 751,127 789,457 900,188 18 1,193,839 2/3/2015 A‐2‐4
Project: A
Knudsen Way
A
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
2/3/2015 A‐2‐5
Project: A
Knudsen Way
A
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $205,735
Mobilization $4,418
Insurance $4,418
Survey 1% $1,473
Site Clearing 1% $1,473
SWPPP (per LF) $2 $1,324
Traffic Control (per LF) $28 $18,535
Subtotal $178,900
Construction Contingency $26,835
Project Development $30,860
Construction Phase $20,574
Project Cost $257,169
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 367 S.Y. $9.63 $3,534
Hauling Pavement 51 $6.47 L.C.Y. $330
Pavement Repair 367 $64.30 S.Y. $23,598
Shoring 16528 SF Wall $0.68 $11,239
Excavation‐Trench 918 B.C.Y. $7.67 $7,041
Pipe Bedding (sand import) 257 L.C.Y. $32.83 $8,437
Bedding Compaction 257 E.C.Y. $3.67 $943
Native Backfill & Compaction 661 $4.25 E.C.Y. $2,809
Water Compaction 661 E.C.Y. $2.48 $1,639
Hauling Excavation 1102 $4.94 B.C.Y. $5,444
Abandon Existing Sewer In Place‐D 661 $5.00 L.F. $3,305 18" ‐ PVC SDR 35 661 $27.81 L.F. $18,382
Bypass Pumping‐ 18" ‐ Fixed Costs 5 Day $1,225.00 $6,125 Bypass Pumping‐ 18" ‐ Variable Costs 3310 L.F.‐Day $0.30 $993 New Manholes 3 Ea. $15,000.00 $45,000
4" PVC for Sewer Laterals 25 L.F. $6.37 $159
Service Connection to 18" Gravity Main 1 Ea. $1,267.84 $1,268 Unaccounted‐for Items $7,012
Segment Label Laterals Diam in Depth ft
SP02375‐L6B 1 18 12.5
SP02377‐L6B 0 18 12.6
SP01561‐L6B 0 18 10.9
2/3/2015 A‐2‐6
Project: A
E Cook St
A
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Current Conditions. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 720 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $250,700
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP02462‐M5C 432 142,991 384,891 384,891 389,411 675,168 15 1,056,649 8 SP02712‐M5C 291 132,764 384,891 384,891 389,411 675,168 15 981,074 2/3/2015 A‐3‐7
Project: A
E Cook St
A
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
2/3/2015 A‐3‐8
Project: A
E Cook St
A
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $200,580
Mobilization $4,241
Insurance $4,241
Survey 1% $1,414
Site Clearing 1% $1,414
SWPPP (per LF) $2 $1,449
Traffic Control (per LF) $28 $20,289
Subtotal $174,417
Construction Contingency $26,163
Project Development $30,087
Construction Phase $20,058
Project Cost $250,725
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 382 S.Y. $9.63 $3,679
Hauling Pavement 53 $6.47 L.C.Y. $343
Pavement Repair 382 $64.30 S.Y. $24,563
Shoring 15675 SF Wall $0.68 $10,659
Excavation‐Trench 799 B.C.Y. $7.67 $6,128
Pipe Bedding (sand import) 248 L.C.Y. $32.83 $8,142
Bedding Compaction 248 E.C.Y. $3.67 $910
Native Backfill & Compaction 551 $4.25 E.C.Y. $2,342
Water Compaction 551 E.C.Y. $2.48 $1,366
Hauling Excavation 959 $4.94 B.C.Y. $4,737
Abandon Existing Sewer In Place‐C 725 $4.00 L.F. $2,900 15" ‐ PVC SDR 35 725 $25.13 L.F. $18,219
Bypass Pumping‐ 15" ‐ Fixed Costs 4 Day $985.00 $3,940
Bypass Pumping‐ 15" ‐ Variable Costs 2899 L.F.‐Day $0.24 $696 New Manholes 3 Ea. $15,000.00 $45,000
4" PVC for Sewer Laterals 25 L.F. $6.37 $159
Service Connection to 15" Gravity Main 1 Ea. $854.14 $854 Unaccounted‐for Items $6,732
Segment Label Laterals Diam in Depth ft
SP02462‐M5C 1 15 10.5
SP02712‐M5C 0 15 11.3
2/3/2015 A‐3‐9
Project: A
McCoy Ln and CA‐135 Intersection
A
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Diameter for this pipeline needs to be confirmed. If the pipeline is already 15" in diameter, then there is adequate capacity and there is no need for project. If diameter of pipeline is less than 15" then the pipeline has inadequate capacity at Current Conditions. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 100 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $53,300
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP03308‐M8C 103 189,625 418,867 418,867 418,867 418,866 15 1,401,254 2/3/2015 A‐4‐10
Project: A
McCoy Ln and CA‐135 Intersection
A
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
2/3/2015 A‐4‐11
Project: A
McCoy Ln and CA‐135 Intersection
A
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $42,658
Mobilization $944
Insurance $944
Survey 1% $315
Site Clearing 1% $315
SWPPP (per LF) $2 $206
Traffic Control (per LF) $28 $2,890
Subtotal $37,094
Construction Contingency $5,564
Project Development $6,399
Construction Phase $4,266
Project Cost $53,322
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 54 S.Y. $9.63 $520
Hauling Pavement 8 $6.47 L.C.Y. $52
Pavement Repair 54 $64.30 S.Y. $3,472
Shoring 4259 SF Wall $0.68 $2,896
Excavation‐Trench 217 B.C.Y. $7.67 $1,664
Pipe Bedding (sand import) 35 L.C.Y. $32.83 $1,149
Bedding Compaction 35 E.C.Y. $3.67 $128
Native Backfill & Compaction 182 $4.25 E.C.Y. $774
Water Compaction 182 E.C.Y. $2.48 $451
Hauling Excavation 260 $4.94 B.C.Y. $1,284
15" ‐ PVC SDR 35 103 $25.13 L.F. $2,588
New Manholes 1 $15,000.00 Ea. $15,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 15" Gravity Main 0 Ea. $854.14 $0 Unaccounted‐for Items $1,499
Segment Label Laterals Diam in Depth ft
SP03308‐M8C 0 15 20.6
2/3/2015 A‐4‐12
Project: A
Between W Creston St and CA‐135
A
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Current Conditions. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 230 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $115,800
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP00493‐M3C 202 235,853 238,267 238,267 239,867 241,467 12 530,165 10 SP00492‐M3C 26 536,102 254,502 257,477 269,876 282,274 12 1,205,080 2/3/2015 A‐5‐13
Project: A
Between W Creston St and CA‐135
A
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
2/3/2015 A‐5‐14
Project: A
Between W Creston St and CA‐135
A
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $92,628
Mobilization $2,046
Insurance $2,046
Survey 1% $682
Site Clearing 1% $682
SWPPP (per LF) $2 $459
Traffic Control (per LF) $28 $6,423
Subtotal $80,546
Construction Contingency $12,082
Project Development $13,894
Construction Phase $9,263
Project Cost $115,785
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 114 S.Y. $9.63 $1,098
Hauling Pavement 16 $6.47 L.C.Y. $104
Pavement Repair 114 $64.30 S.Y. $7,330
Shoring 10598 SF Wall $0.68 $7,207
Excavation‐Trench 491 B.C.Y. $7.67 $3,766
Pipe Bedding (sand import) 69 L.C.Y. $32.83 $2,265
Bedding Compaction 69 E.C.Y. $3.67 $253
Native Backfill & Compaction 422 $4.25 E.C.Y. $1,794
Water Compaction 422 E.C.Y. $2.48 $1,047
Hauling Excavation 589 $4.94 B.C.Y. $2,910
Abandon Existing Sewer In Place‐B 230 $3.50 L.F. $805
12" ‐ PVC SDR 35 230 $21.03 L.F. $4,837
Bypass Pumping‐ 12" ‐ Fixed Costs 2 Day $745.00 $1,490
Bypass Pumping‐ 12" ‐ Variable Costs 459 L.F.‐Day $0.12 $55 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 12” Gravity Main 0 Ea. $573.65 $0 Unaccounted‐for Items $3,248
Segment Label Laterals Diam in Depth ft
SP00492‐M3C 0 12 24.7
SP00493‐M3C 0 12 22.9
2/3/2015 A‐5‐15
Project: A
Between S Airpark Dr and Skyway Dr
A
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Current Conditions. Slopes for each pipeline need to be confirmed prior to planning. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1090 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $347,900
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP03512‐L9C 260 95,737 230,623 230,623 230,623 265,674 12 390,191 10 SP03089‐L9C 317 326,524 240,327 240,327 240,327 275,378 12 733,980 10 SP03092‐L9C 328 326,524 240,327 240,327 240,327 275,378 12 733,980 10 SP03093‐L9C 181 326,524 240,327 240,327 240,327 275,378 12 733,980 2/3/2015 A‐6‐16
Project: A
Between S Airpark Dr and Skyway Dr
A
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
2/3/2015 A‐6‐17
Project: A
Between S Airpark Dr and Skyway Dr
A
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $278,286
Mobilization $5,814
Insurance $5,814
Survey 1% $1,938
Site Clearing 1% $1,938
SWPPP (per LF) $2 $2,178
Traffic Control (per LF) $28 $30,489
Subtotal $241,988
Construction Contingency $36,298
Project Development $41,743
Construction Phase $27,829
Project Cost $347,858
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 544 S.Y. $9.63 $5,239
Hauling Pavement 76 $6.47 L.C.Y. $492
Pavement Repair 544 $64.30 S.Y. $34,979
Shoring 25522 SF Wall $0.68 $17,355
Excavation‐Trench 1181 B.C.Y. $7.67 $9,058
Pipe Bedding (sand import) 325 L.C.Y. $32.83 $10,670
Bedding Compaction 325 E.C.Y. $3.67 $1,193
Native Backfill & Compaction 856 $4.25 E.C.Y. $3,638
Water Compaction 856 E.C.Y. $2.48 $2,123
Hauling Excavation 1417 $4.94 B.C.Y. $7,000
Abandon Existing Sewer In Place‐B 1089 $3.50 L.F. $3,812 12" ‐ PVC SDR 35 1089 $21.03 L.F. $22,902
Bypass Pumping‐ 12" ‐ Fixed Costs 7 Day $745.00 $5,215
Bypass Pumping‐ 12" ‐ Variable Costs 7623 L.F.‐Day $0.12 $912 New Manholes 4 Ea. $15,000.00 $60,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 12” Gravity Main 0 Ea. $573.65 $0 Unaccounted‐for Items $9,229
Segment Label Laterals Diam in Depth ft
SP03089‐L9C 0 12 10.5
SP03092‐L9C 0 12 11.3
SP03093‐L9C 0 12 17.0
SP03512‐L9C 0 12 10.0
2/3/2015 A‐6‐18
Project: B
W Main St
B
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 0 to 5 year scenerion. See table below for capacity information for each segment included in the project.
Alternatives:
Project: The City and design engineer should evaluate possible parallel construction options. Decreased pipe size could be feasible depending on condition and long term life cycle cost evaluation of maintaining two parallel trunk lines.
Evaluate in conjunction will all of the Main Street Trunk Main/Dejoy Phase II upgrade projects.
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 27 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 50 ft of 27 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $26,200
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
14 SP01820‐M5A 46 1,045,254 1,552,790 1,611,614 1,693,728 2,542,486 27 6,023,522 2/3/2015 B‐1‐19
Project: B
W Main St
B
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
2/3/2015 B‐1‐20
Project: B
W Main St
B
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $21,000
Mobilization $468
Insurance $468
Survey 1% $156
Site Clearing 1% $156
SWPPP (per LF) $2 $93
Traffic Control (per LF) $28 $1,307
Subtotal $18,260
Construction Contingency $2,739
Project Development $3,150
Construction Phase $2,100
Project Cost $26,249
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 30 S.Y. $9.63 $289
Hauling Pavement 4 $6.47 L.C.Y. $26
Pavement Repair 30 $64.30 S.Y. $1,929
Shoring 2361 SF Wall $0.68 $1,605
Excavation‐Trench 164 B.C.Y. $7.67 $1,258
Pipe Bedding (sand import) 25 L.C.Y. $32.83 $821
Bedding Compaction 25 E.C.Y. $3.67 $92
Native Backfill & Compaction 139 $4.25 E.C.Y. $591
Water Compaction 139 E.C.Y. $2.48 $345
Hauling Excavation 197 $4.94 B.C.Y. $973
Abandon Existing Sewer In Place‐G 47 $8.00 L.F. $376
27" ‐ PVC SDR 35 47 $97.78 L.F. $4,596
Bypass Pumping‐ 27" ‐ Fixed Costs 1 Day $1,945.00 $1,945 Bypass Pumping‐ 27" ‐ Variable Costs 47 L.F.‐Day $0.48 $23 New Manholes 0 Ea. $15,000.00 $0
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 24" Gravity Main 0 Ea. $4,616.84 $0 Unaccounted‐for Items $743
Segment Label Laterals Diam in Depth ft
SP01820‐M5A 0 27 25.3
2/3/2015 B‐1‐21
Project: C
Parallel to W Main St
C
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
Construction (Months): 6
Project Development (Months): 6
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Project: The City and design engineer should evaluate possible parallel construction options. Decreased pipe size could be feasible depending on condition and long term life cycle cost evaluation of maintaining two parallel trunk lines.
Evaluate in conjunction will all of the Main Street Trunk Main/Dejoy Phase II upgrade projects.
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 36 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1910 ft of 36 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $1,483,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
27 SP01863‐L5B 497 4,207,010 3,527,045 3,617,682 3,817,826 5,150,016 36 9,060,320 27 SP01815‐L5B 138 15,457,543 3,695,317 3,785,954 3,987,643 5,321,380 36 33,289,743 27 SP01864‐L5B 150 4,207,010 3,695,317 3,785,954 3,987,643 5,321,380 36 9,060,320 27 SP00733‐L5B 541 3,643,378 3,699,873 3,790,510 3,992,199 5,328,136 36 7,846,468 27 SP00734‐L5B 325 4,207,010 3,700,823 3,791,460 3,993,149 5,329,885 36 9,060,320 27 SP00728‐L5A 225 4,207,010 3,700,838 3,791,475 3,993,164 5,329,900 36 9,060,320 27 SP00727‐L5A 32 18,954,905 3,700,852 3,791,490 3,993,179 5,329,915 36 40,821,746 2/3/2015 C‐1‐22
Project: C
Parallel to W Main St
C
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
2/3/2015 C‐1‐23
Project: C
Parallel to W Main St
C
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $1,186,439
Mobilization $27,066
Insurance $27,066
Survey 1% $9,022
Site Clearing 1% $9,022
SWPPP (per LF) $2 $3,821
Traffic Control (per LF) $28 $53,500
Subtotal $1,031,686
Construction Contingency $154,753
Project Development $177,966
Construction Phase $118,644
Project Cost $1,483,049
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1380 S.Y. $9.63 $13,289
Hauling Pavement 192 $6.47 L.C.Y. $1,242
Pavement Repair 1380 $64.30 S.Y. $88,734
Shoring 58297 SF Wall $0.68 $39,642
Excavation‐Trench 4857 B.C.Y. $7.67 $37,253
Pipe Bedding (sand import) 1310 L.C.Y. $32.83 $43,007
Bedding Compaction 1310 E.C.Y. $3.67 $4,808
Native Backfill & Compaction 3547 $4.25 E.C.Y. $15,075
Water Compaction 3547 E.C.Y. $2.48 $8,797
Hauling Excavation 5829 $4.94 B.C.Y. $28,795
Abandon Existing Sewer In Place‐I 1910 $10.00 L.F. $19,100 36" ‐ PVC SDR 35 1910 $199.66 L.F. $381,351
Bypass Pumping‐ 36" ‐ Fixed Costs 14 Day $2,665.00 $37,310 Bypass Pumping‐ 36" ‐ Variable Costs 26749 L.F.‐Day $0.60 $16,049 New Manholes 8 Ea. $15,000.00 $120,000
4" PVC for Sewer Laterals 25 L.F. $6.37 $159
Service Connection to 24" Gravity Main 1 Ea. $4,616.84 $4,617 Unaccounted‐for Items $42,961
Segment Label Laterals Diam in Depth ft
SP00727‐L5A 0 36 14.9
SP00728‐L5A 0 36 17.1
SP00733‐L5B 0 36 11.8
SP00734‐L5B 0 36 14.2
SP01815‐L5B 0 36 9.8
SP01863‐L5B 1 36 19.6
SP01864‐L5B 0 36 18.0
2/3/2015 C‐1‐24
Project: C
E Tunnel St
C
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 550 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $224,500
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
12 SP02285‐N5A 276 459,136 350,909 409,733 473,461 537,444 15 832,469 12 SP02289‐N5A 263 459,136 358,740 417,564 481,292 545,276 15 832,469 12 SP02290‐N5A 12 4,878,284 365,376 424,200 487,928 551,912 15 8,844,917 2/3/2015 C‐2‐25
Project: C
E Tunnel St
C
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
2/3/2015 C‐2‐26
Project: C
E Tunnel St
C
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $179,610
Mobilization $3,878
Insurance $3,878
Survey 1% $1,293
Site Clearing 1% $1,293
SWPPP (per LF) $2 $1,105
Traffic Control (per LF) $28 $15,464
Subtotal $156,182
Construction Contingency $23,427
Project Development $26,941
Construction Phase $17,961
Project Cost $224,512
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 292 S.Y. $9.63 $2,812
Hauling Pavement 40 $6.47 L.C.Y. $259
Pavement Repair 292 $64.30 S.Y. $18,776
Shoring 20904 SF Wall $0.68 $14,215
Excavation‐Trench 1065 B.C.Y. $7.67 $8,169
Pipe Bedding (sand import) 189 L.C.Y. $32.83 $6,205
Bedding Compaction 189 E.C.Y. $3.67 $694
Native Backfill & Compaction 876 $4.25 E.C.Y. $3,723
Water Compaction 876 E.C.Y. $2.48 $2,172
Hauling Excavation 1279 $4.94 B.C.Y. $6,318
Abandon Existing Sewer In Place‐C 552 $4.00 L.F. $2,208 15" ‐ PVC SDR 35 552 $25.13 L.F. $13,872
Bypass Pumping‐ 15" ‐ Fixed Costs 5 Day $985.00 $4,925
Bypass Pumping‐ 15" ‐ Variable Costs 2762 L.F.‐Day $0.24 $663 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 200 L.F. $6.37 $1,274
Service Connection to 15" Gravity Main 8 Ea. $854.14 $6,833 Unaccounted‐for Items $6,156
Segment Label Laterals Diam in Depth ft
SP02285‐N5A 5 15 19.5
SP02289‐N5A 3 15 18.4
SP02290‐N5A 0 15 19.0
2/3/2015 C‐2‐27
Project: C
East Fesler St
C
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
Construction (Months): 6
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1700 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $1,112,200
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP00219‐N5B 259 240,717 117,156 175,980 239,604 303,228 15 981,074 10 SP02009‐N5B 247 215,304 137,934 196,758 260,382 324,006 15 877,500 10 SP02321‐N5B 247 225,812 148,302 207,126 270,750 334,374 15 920,329 10 SP01999‐N5B 504 198,500 154,505 213,329 277,057 340,784 15 809,015 10 SP02319‐N5B 140 315,697 155,299 214,123 277,851 341,579 15 1,286,667 10 SP02319‐N5B 247 315,697 155,299 214,123 277,851 341,579 15 1,286,667 10 SP02320‐N5B 50 225,812 161,876 220,700 284,428 348,156 15 920,329 2/3/2015 C‐3‐28
Project: C
East Fesler St
C
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
2/3/2015 C‐3‐29
Project: C
East Fesler St
C
Utililties Capcity Study Capital Project Descriptions
3 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $889,767
Mobilization $20,077
Insurance $20,077
Survey 1% $6,692
Site Clearing 1% $6,692
SWPPP (per LF) $2 $3,395
Traffic Control (per LF) $28 $47,536
Subtotal $773,711
Construction Contingency $116,057
Project Development $133,465
Construction Phase $88,977
Project Cost $1,112,209
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1101 S.Y. $9.63 $10,603
Hauling Pavement 152 $6.47 L.C.Y. $983
Pavement Repair 1101 $64.30 S.Y. $70,794
Shoring 61007 SF Wall $0.68 $41,485
Excavation‐Trench 3108 B.C.Y. $7.67 $23,838
Pipe Bedding (sand import) 715 L.C.Y. $32.83 $23,473
Bedding Compaction 715 E.C.Y. $3.67 $2,624
Native Backfill & Compaction 2393 $4.25 E.C.Y. $10,170
Water Compaction 2393 E.C.Y. $2.48 $5,935
Hauling Excavation 3730 $4.94 B.C.Y. $18,426
Abandon Existing Sewer In Place‐C 2087 $4.00 L.F. $8,348 15" ‐ PVC SDR 35 2087 $25.13 L.F. $52,446
Bypass Pumping‐ 15" ‐ Fixed Costs 16 Day $985.00 $15,760 Bypass Pumping‐ 15" ‐ Variable Costs 33376 L.F.‐Day $0.24 $8,010 New Manholes 10 Ea. $15,000.00 $150,000
4" PVC for Sewer Laterals 450 L.F. $6.37 $2,867
Service Connection to 15" Gravity Main 18 Ea. $854.14 $15,375 Unaccounted‐for Items $23,057
Segment Label Laterals Diam in Depth ft
SP00219‐N5B 0 15 22.7
SP01999‐N5B 9 15 10.7
SP02319‐N5B 3 15 11.5
SP02320‐N5B 0 15 11.7
SP02321‐N5B 3 15 11.1
SP02319‐N5B 0 15 17.0
SP02009‐N5B 0 15 17.0
2/3/2015 C‐3‐30
Project: C
Between Channel Dr and Preisker Ln
C
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 440 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $165,800
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP00550‐M3B 98 204,255 152,196 152,196 230,392 308,588 15 832,469 12 SP00549‐M3B 73 241,986 152,115 152,115 224,377 296,638 15 438,750 12 SP01124‐M3B 272 639,478 152,115 152,115 230,311 308,506 15 1,159,451 2/3/2015 C‐4‐31
Project: C
Between Channel Dr and Preisker Ln
C
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
2/3/2015 C‐4‐32
Project: C
Between Channel Dr and Preisker Ln
C
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $132,649
Mobilization $2,833
Insurance $2,833
Survey 1% $944
Site Clearing 1% $944
SWPPP (per LF) $2 $890
Traffic Control (per LF) $28 $12,454
Subtotal $115,347
Construction Contingency $17,302
Project Development $19,897
Construction Phase $13,265
Project Cost $165,811
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 235 S.Y. $9.63 $2,263
Hauling Pavement 32 $6.47 L.C.Y. $207
Pavement Repair 235 $64.30 S.Y. $15,111
Shoring 11961 SF Wall $0.68 $8,133
Excavation‐Trench 609 B.C.Y. $7.67 $4,671
Pipe Bedding (sand import) 152 L.C.Y. $32.83 $4,990
Bedding Compaction 152 E.C.Y. $3.67 $558
Native Backfill & Compaction 457 $4.25 E.C.Y. $1,942
Water Compaction 457 E.C.Y. $2.48 $1,133
Hauling Excavation 731 $4.94 B.C.Y. $3,611
Abandon Existing Sewer In Place‐C 445 $4.00 L.F. $1,780 15" ‐ PVC SDR 35 445 $25.13 L.F. $11,183
Bypass Pumping‐ 15" ‐ Fixed Costs 4 Day $985.00 $3,940
Bypass Pumping‐ 15" ‐ Variable Costs 1779 L.F.‐Day $0.24 $427 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 15" Gravity Main 0 Ea. $854.14 $0 Unaccounted‐for Items $4,497
Segment Label Laterals Diam in Depth ft
SP00549‐M3B 0 15 13.8
SP00550‐M3B 0 15 12.3
SP01124‐M3B 0 15 13.8
2/3/2015 C‐4‐33
Project: C
Alcala Dr
C
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
Construction (Months): 5
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1420 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $531,100
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
6 SP04336‐O5A 84 89,822 553 29,965 59,377 88,788 12 788,402 6 SP03916‐O5A 304 88,632 4,431 63,255 122,079 180,903 12 777,959 6 SP03810‐O5A 353 90,996 7,752 66,576 125,400 184,224 12 798,708 6 SP03811‐O5A 253 90,996 10,537 69,361 128,185 187,008 12 798,708 8 SP03812‐O5A 29 150,496 10,732 69,556 128,380 187,204 12 613,366 8 SP03813‐O5A 157 174,719 21,213 80,037 143,661 207,284 12 712,093 8 SePipes_Update 34 226,288 22,784 81,608 145,232 208,856 12 922,269 8 SePipes_Update 198 171,878 22,784 81,608 145,232 208,856 12 700,513 2/3/2015 C‐5‐34
Project: C
Alcala Dr
C
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
2/3/2015 C‐5‐35
Project: C
Alcala Dr
C
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $424,845
Mobilization $9,081
Insurance $9,081
Survey 1% $3,027
Site Clearing 1% $3,027
SWPPP (per LF) $2 $2,833
Traffic Control (per LF) $28 $39,668
Subtotal $369,431
Construction Contingency $55,415
Project Development $63,727
Construction Phase $42,485
Project Cost $531,057
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 708 S.Y. $9.63 $6,818
Hauling Pavement 99 $6.47 L.C.Y. $641
Pavement Repair 708 $64.30 S.Y. $45,524
Shoring 24428 SF Wall $0.68 $16,611
Excavation‐Trench 1130 B.C.Y. $7.67 $8,667
Pipe Bedding (sand import) 423 L.C.Y. $32.83 $13,887
Bedding Compaction 423 E.C.Y. $3.67 $1,552
Native Backfill & Compaction 707 $4.25 E.C.Y. $3,005
Water Compaction 707 E.C.Y. $2.48 $1,753
Hauling Excavation 1356 $4.94 B.C.Y. $6,699
Abandon Existing Sewer In Place‐B 1417 $3.50 L.F. $4,960 12" ‐ PVC SDR 35 1417 $21.03 L.F. $29,800
Bypass Pumping‐ 12" ‐ Fixed Costs 11 Day $745.00 $8,195 Bypass Pumping‐ 12" ‐ Variable Costs 15584 L.F.‐Day $0.12 $1,864 New Manholes 8 Ea. $15,000.00 $120,000
4" PVC for Sewer Laterals 625 L.F. $6.37 $3,981
Service Connection to 12” Gravity Main 25 Ea. $573.65 $14,341 Unaccounted‐for Items $14,415
Segment Label Laterals Diam in Depth ft
SePipes_Updated19 0 12 7.5
SePipes_Updated31 1 12 9.7
SP03810‐O5A 9 12 8.7
SP03811‐O5A 4 12 8.4
SP03812‐O5A 0 12 8.0
SP03813‐O5A 0 12 7.8
SP03916‐O5A 9 12 8.7
SP04336‐O5A 2 12 8.5
2/3/2015 C‐5‐36
Project: C
Rowland Dr
C
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 560 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $181,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP01740‐O5A 309 225,812 36,633 95,457 159,081 222,704 12 507,594 10 SP01741‐O5A 252 159,673 38,093 96,917 160,541 224,164 12 358,923 2/3/2015 C‐6‐37
Project: C
Rowland Dr
C
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
2/3/2015 C‐6‐38
Project: C
Rowland Dr
C
Utililties Capcity Study Capital Project Descriptions
6 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $144,763
Mobilization $3,029
Insurance $3,029
Survey 1% $1,010
Site Clearing 1% $1,010
SWPPP (per LF) $2 $1,123
Traffic Control (per LF) $28 $15,717
Subtotal $125,881
Construction Contingency $18,882
Project Development $21,714
Construction Phase $14,476
Project Cost $180,954
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 281 S.Y. $9.63 $2,706
Hauling Pavement 40 $6.47 L.C.Y. $259
Pavement Repair 281 $64.30 S.Y. $18,068
Shoring 14273 SF Wall $0.68 $9,706
Excavation‐Trench 661 B.C.Y. $7.67 $5,070
Pipe Bedding (sand import) 167 L.C.Y. $32.83 $5,483
Bedding Compaction 167 E.C.Y. $3.67 $613
Native Backfill & Compaction 494 $4.25 E.C.Y. $2,100
Water Compaction 494 E.C.Y. $2.48 $1,225
Hauling Excavation 793 $4.94 B.C.Y. $3,917
Abandon Existing Sewer In Place‐B 561 $3.50 L.F. $1,964 12" ‐ PVC SDR 35 561 $21.03 L.F. $11,798
Bypass Pumping‐ 12" ‐ Fixed Costs 4 Day $745.00 $2,980
Bypass Pumping‐ 12" ‐ Variable Costs 2245 L.F.‐Day $0.12 $269 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 12” Gravity Main 0 Ea. $573.65 $0 Unaccounted‐for Items $4,808
Segment Label Laterals Diam in Depth ft
SP01741‐O5A 0 12 12.9
SP01740‐O5A 0 12 12.6
2/3/2015 C‐6‐39
Project: C
W Camino Colegio Rd
C
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 500 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $170,400
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP01307‐M6D 495 118,748 112,777 112,777 119,740 159,106 10 215,304 2/3/2015 C‐7‐40
Project: C
W Camino Colegio Rd
C
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
2/3/2015 C‐7‐41
Project: C
W Camino Colegio Rd
C
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $136,291
Mobilization $2,879
Insurance $2,879
Survey 1% $960
Site Clearing 1% $960
SWPPP (per LF) $2 $991
Traffic Control (per LF) $28 $13,868
Subtotal $118,514
Construction Contingency $17,777
Project Development $20,444
Construction Phase $13,629
Project Cost $170,364
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 238 S.Y. $9.63 $2,292
Hauling Pavement 33 $6.47 L.C.Y. $214
Pavement Repair 238 $64.30 S.Y. $15,303
Shoring 17543 SF Wall $0.68 $11,929
Excavation‐Trench 758 B.C.Y. $7.67 $5,814
Pipe Bedding (sand import) 134 L.C.Y. $32.83 $4,399
Bedding Compaction 134 E.C.Y. $3.67 $492
Native Backfill & Compaction 624 $4.25 E.C.Y. $2,652
Water Compaction 624 E.C.Y. $2.48 $1,548
Hauling Excavation 910 $4.94 B.C.Y. $4,495
Abandon Existing Sewer In Place‐A 495 $3.00 L.F. $1,485 10" ‐ PVC SDR 35 495 $17.94 L.F. $8,880
Bypass Pumping‐ 10" ‐ Fixed Costs 3 Day $585.00 $1,755
Bypass Pumping‐ 10" ‐ Variable Costs 1486 L.F.‐Day $0.10 $149 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 10” Gravity Main 0 Ea. $461.57 $0 Unaccounted‐for Items $4,570
Segment Label Laterals Diam in Depth ft
SP01307‐M6D 0 10 17.7
2/3/2015 C‐7‐42
Project: C
Elaine Ave
C
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at 5 to 10 year scenerio. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 8 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 520 ft of 8 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $141,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
6 SP03885‐L7C 276 90,996 2,599 53,253 103,907 154,560 8 195,971 6 SP03886‐L7C 244 92,155 2,599 53,253 103,907 154,560 8 198,468 2/3/2015 C‐8‐43
Project: C
Elaine Ave
C
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
2/3/2015 C‐8‐44
Project: C
Elaine Ave
C
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $112,794
Mobilization $2,291
Insurance $2,291
Survey 1% $764
Site Clearing 1% $764
SWPPP (per LF) $2 $1,042
Traffic Control (per LF) $28 $14,582
Subtotal $98,082
Construction Contingency $14,712
Project Development $16,919
Construction Phase $11,279
Project Cost $140,993
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 241 S.Y. $9.63 $2,321
Hauling Pavement 34 $6.47 L.C.Y. $220
Pavement Repair 241 $64.30 S.Y. $15,496
Shoring 4828 SF Wall $0.68 $3,283
Excavation‐Trench 194 B.C.Y. $7.67 $1,488
Pipe Bedding (sand import) 126 L.C.Y. $32.83 $4,137
Bedding Compaction 126 E.C.Y. $3.67 $462
Native Backfill & Compaction 68 $4.25 E.C.Y. $289
Water Compaction 68 E.C.Y. $2.48 $169
Hauling Excavation 232 $4.94 B.C.Y. $1,146
Abandon Existing Sewer In Place 521 $2.00 L.F. $1,042
8" ‐ PVC SDR 35 521 $12.95 L.F. $6,747
Bypass Pumping‐ 8" ‐ Fixed Costs 4 $425.00 Day $1,700
Bypass Pumping‐ 8" ‐ Variable Costs 2083 $0.08 L.F.‐Day $167 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 300 L.F. $6.37 $1,911
Service ConnecƟon to 8” Gravity Main 12 $178.05 Ea. $2,137 Unaccounted‐for Items $3,636
Segment Label Laterals Diam in Depth ft
SP03885‐L7C 6 8 4.6
SP03886‐L7C 6 8 4.7
2/3/2015 C‐8‐45
Project: D
Southwest Trunk
D
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
Construction (Months): 20
Project Development (Months): 15
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Project: The City and design engineer should evaluate possible parallel construction options. Decreased pipe size could be feasible depending on condition and long term life cycle cost evaluation of maintaining two parallel trunk lines.
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 42 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 13330 ft of 42 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $11,675,400
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
27 SP02163‐L7A 868 4,796,730 2,402,849 2,782,136 3,606,977 6,070,872 42 15,582,603 30 SP02954‐L7A 894 4,132,139 2,402,849 2,782,136 3,606,977 6,070,872 42 10,135,605 30 SP00747‐L6D 1103 4,132,139 2,406,011 2,785,298 3,618,738 6,100,150 42 10,135,605 30 SP00745‐L6D 1035 4,132,139 2,730,605 3,109,891 3,951,932 6,466,411 42 10,135,605 30 SP02339‐K5C 1258 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02340‐K5C 1192 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02342‐K5C 1228 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02343‐K5D 921 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02344‐K5D 1000 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02345‐K5D 1005 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02347‐K6B 1002 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02348‐K6B 1031 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02335‐J5C 692 4,132,139 2,733,158 3,112,444 3,954,484 6,468,964 42 10,135,605 30 SP02337‐J5C 98 4,132,139 2,733,158 3,130,006 4,024,368 7,162,409 42 10,135,605 2/3/2015 D‐1‐46
Project: D
Southwest Trunk
D
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
2/3/2015 D‐1‐47
Project: D
Southwest Trunk
D
Utililties Capcity Study Capital Project Descriptions
1 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $9,340,291
Mobilization $214,499
Insurance $214,499
Survey 1% $71,500
Site Clearing 1% $71,500
SWPPP (per LF) $2 $26,669
Traffic Control (per LF) $28 $373,359
Subtotal $8,121,992
Construction Contingency $1,218,299
Project Development $1,401,044
Construction Phase $934,029
Project Cost $11,675,364
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 10371 S.Y. $9.63 $99,873
Hauling Pavement 1442 $6.47 L.C.Y. $9,330
Pavement Repair 10371 $64.30 S.Y. $666,855
Shoring 431008 SF Wall $0.68 $293,085
Excavation‐Trench 39909 B.C.Y. $7.67 $306,102
Pipe Bedding (sand import) 10598 L.C.Y. $32.83 $347,932 Bedding Compaction 10598 E.C.Y. $3.67 $38,895
Native Backfill & Compaction 29311 $4.25 E.C.Y. $124,572 Water Compaction 29311 E.C.Y. $2.48 $72,691
Hauling Excavation 47889 $4.94 B.C.Y. $236,572
Abandon Existing Sewer In Place‐J 13335 $13.00 L.F. $173,355 42" ‐ PVC SDR 35 13335 $205.00 L.F. $2,733,675
Bypass Pumping‐ 42" ‐ Fixed Costs 96 Day $3,145.00 $301,920 Bypass Pumping‐ 42" ‐ Variable Costs 1280090 L.F.‐Day $0.66 $844,859 New Manholes 37 Ea. $15,000.00 $555,000
4" PVC for Sewer Laterals 25 L.F. $6.37 $159
Service Connection to 24" Gravity Main 1 Ea. $4,616.84 $4,617 Unaccounted‐for Items $340,475
Segment Label Laterals Diam in Depth ft
SP00745‐L6D 0 42 17.2
SP00747‐L6D 0 42 12.5
SP02163‐L7A 0 42 17.4
SP02339‐K5C 0 42 18.3
SP02340‐K5C 0 42 17.3
SP02342‐K5C 0 42 16.9
SP02343‐K5D 0 42 16.2
SP02344‐K5D 0 42 14.8
SP02345‐K5D 1 42 12.8
SP02347‐K6B 0 42 18.9
SP02348‐K6B 0 42 18.3
SP02954‐L7A 0 42 17.8
SP02335‐J5C 0 42 10.2
SP02337‐J5C 0 42 11.5
2/3/2015 D‐1‐48
Project: D
West Main Trunk
D
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
Construction (Months): 10
Project Development (Months): 8
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Project: The City and design engineer should evaluate possible parallel construction options. Decreased pipe size could be feasible depending on condition and long term life cycle cost evaluation of maintaining two parallel trunk lines.
Evaluate in conjunction will all of the Main Street Trunk Main/Dejoy Phase II upgrade projects.
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 36 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 4860 ft of 36 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $3,510,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
27 SP00720‐L5A 675 4,412,350 3,712,382 3,803,020 4,004,709 5,341,445 36 9,502,544 27 SP00722‐L5A 709 4,310,903 3,712,382 3,803,020 4,004,709 5,341,445 36 9,284,066 27 SP00723‐L5A 692 4,100,487 3,712,382 3,803,020 4,004,709 5,341,445 36 8,830,908 27 SP00726‐L5A 519 4,703,581 3,712,382 3,803,020 4,004,709 5,341,445 36 10,129,746 27 SP01285‐K5B 668 4,412,350 3,712,382 3,803,020 4,004,709 5,341,445 36 9,502,544 27 SP01636‐K5B 668 4,412,350 3,712,382 3,803,020 4,004,709 5,341,445 36 9,502,544 27 SP01637‐K5B 686 4,412,350 3,712,382 3,803,020 4,004,709 5,341,445 36 9,502,544 27 SP01640‐K5Ba 245 7,225,778 3,712,382 3,803,020 4,004,709 5,341,445 36 15,561,611 2/3/2015 D‐2‐49
Project: D
West Main Trunk
D
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
2/3/2015 D‐2‐50
Project: D
West Main Trunk
D
Utililties Capcity Study Capital Project Descriptions
2 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $2,807,999
Mobilization $63,772
Insurance $63,772
Survey 1% $21,257
Site Clearing 1% $21,257
SWPPP (per LF) $2 $9,730
Traffic Control (per LF) $28 $136,213
Subtotal $2,441,738
Construction Contingency $366,261
Project Development $421,200
Construction Phase $280,800
Project Cost $3,509,999
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 3513 S.Y. $9.63 $33,830
Hauling Pavement 488 $6.47 L.C.Y. $3,157
Pavement Repair 3513 $64.30 S.Y. $225,886
Shoring 97518 SF Wall $0.68 $66,312
Excavation‐Trench 8127 B.C.Y. $7.67 $62,334
Pipe Bedding (sand import) 3336 L.C.Y. $32.83 $109,521
Bedding Compaction 3336 E.C.Y. $3.67 $12,243
Native Backfill & Compaction 4791 $4.25 E.C.Y. $20,362
Water Compaction 4791 E.C.Y. $2.48 $11,882
Hauling Excavation 9753 $4.94 B.C.Y. $48,180
Abandon Existing Sewer In Place‐I 4864 $10.00 L.F. $48,640 36" ‐ PVC SDR 35 4864 $199.66 L.F. $971,146
Bypass Pumping‐ 36" ‐ Fixed Costs 36 Day $2,665.00 $95,940 Bypass Pumping‐ 36" ‐ Variable Costs 175130 L.F.‐Day $0.60 $105,078 New Manholes 14 Ea. $15,000.00 $210,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 24" Gravity Main 0 Ea. $4,616.84 $0 Unaccounted‐for Items $101,226
Segment Label Laterals Diam in Depth ft
SP00720‐L5A 0 36 10.5
SP00722‐L5A 0 36 10.2
SP00723‐L5A 0 36 9.4
SP00726‐L5A 0 36 10.8
SP01285‐K5B 0 36 9.1
SP01636‐K5B 0 36 9.4
SP01637‐K5B 0 36 10.7
SP01640‐K5Ba 0 36 10.2
2/3/2015 D‐2‐51
Project: D
W La Brea Ave
D
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
Construction (Months): 10
Project Development (Months): 7
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 21 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 5220 ft of 21 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $2,034,700
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
15 SP03505‐L7B 312 784,859 274,030 312,862 645,997 1,076,372 21 1,925,159 15 SP03501‐L7B 666 784,859 274,030 312,862 618,465 1,021,309 21 1,925,159 15 SP02183‐L7B 226 981,074 274,473 313,305 646,440 1,076,814 21 2,406,449 15 SP02947‐L7B 503 981,074 275,157 313,989 660,707 1,104,666 21 2,406,449 15 SP01090‐L7A 509 981,074 275,398 366,461 791,034 1,312,846 21 2,406,449 15 SP02948‐L7B 495 981,074 275,398 314,230 680,552 1,144,114 21 2,406,449 15 SP01091‐L7A 561 920,329 275,399 418,692 895,496 1,469,540 21 2,257,449 15 SP01088‐L7A 204 1,359,416 275,400 418,693 895,497 1,469,541 21 3,334,474 15 SP01089‐L7A 417 1,056,649 275,400 418,693 895,497 1,469,541 21 2,591,825 15 SP02166‐L7A 555 941,013 275,400 418,693 895,497 1,469,541 21 2,308,185 15 SP02167‐L7A 431 1,056,649 275,400 418,693 895,497 1,469,541 21 2,591,825 15 SP02168‐L7A 337 784,859 275,400 418,693 895,497 1,469,541 21 1,925,159 2/3/2015 D‐4‐52
Project: D
W La Brea Ave
D
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
2/3/2015 D‐4‐53
Project: D
W La Brea Ave
D
Utililties Capcity Study Capital Project Descriptions
4 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $1,627,755
Mobilization $34,967
Insurance $34,967
Survey 1% $11,655
Site Clearing 1% $11,655
SWPPP (per LF) $2 $10,443
Traffic Control (per LF) $28 $146,200
Subtotal $1,415,439
Construction Contingency $212,316
Project Development $244,163
Construction Phase $162,775
Project Cost $2,034,693
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 3046 S.Y. $9.63 $29,333
Hauling Pavement 422 $6.47 L.C.Y. $2,730
Pavement Repair 3046 $64.30 S.Y. $195,858
Shoring 154737 SF Wall $0.68 $105,221
Excavation‐Trench 9313 B.C.Y. $7.67 $71,431
Pipe Bedding (sand import) 2272 L.C.Y. $32.83 $74,590
Bedding Compaction 2272 E.C.Y. $3.67 $8,338
Native Backfill & Compaction 7041 $4.25 E.C.Y. $29,924
Water Compaction 7041 E.C.Y. $2.48 $17,462
Hauling Excavation 11175 $4.94 B.C.Y. $55,205
Abandon Existing Sewer In Place‐E 5223 $6.00 L.F. $31,338 21" ‐ PVC SDR 35 5223 $34.81 L.F. $181,813
Bypass Pumping‐ 21" ‐ Fixed Costs 32 Day $1,465.00 $46,880 Bypass Pumping‐ 21" ‐ Variable Costs 167086 L.F.‐Day $0.36 $60,151 New Manholes 13 Ea. $15,000.00 $195,000
4" PVC for Sewer Laterals 25 L.F. $6.37 $159
Service Connection to 24" Gravity Main 1 Ea. $4,616.84 $4,617 Unaccounted‐for Items $55,502
Segment Label Laterals Diam in Depth ft
SP01088‐L7A 0 21 15.0
SP01089‐L7A 0 21 15.5
SP01090‐L7A 0 21 15.9
SP01091‐L7A 0 21 16.0
SP02166‐L7A 0 21 16.4
SP02167‐L7A 0 21 15.9
SP02168‐L7A 0 21 15.3
SP02183‐L7B 1 21 17.2
SP02947‐L7B 0 21 17.1
SP02948‐L7B 0 21 16.2
SP03505‐L7B 0 21 11.8
SP03501‐L7B 0 21 8.1
2/3/2015 D‐4‐54
Project: D
W McCoy Ln
D
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 18 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 370 ft of 18 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $119,400
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
15 SP03448‐L8C 365 1,092,478 853,560 902,972 991,396 1,142,742 18 1,776,490 2/3/2015 D‐5‐55
Project: D
W McCoy Ln
D
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
2/3/2015 D‐5‐56
Project: D
W McCoy Ln
D
Utililties Capcity Study Capital Project Descriptions
5 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $95,514
Mobilization $2,003
Insurance $2,003
Survey 1% $668
Site Clearing 1% $668
SWPPP (per LF) $2 $730
Traffic Control (per LF) $28 $10,226
Subtotal $83,056
Construction Contingency $12,458
Project Development $14,327
Construction Phase $9,551
Project Cost $119,393
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 203 S.Y. $9.63 $1,955
Hauling Pavement 28 $6.47 L.C.Y. $181
Pavement Repair 203 $64.30 S.Y. $13,053
Shoring 8020 SF Wall $0.68 $5,454
Excavation‐Trench 446 B.C.Y. $7.67 $3,421
Pipe Bedding (sand import) 142 L.C.Y. $32.83 $4,662
Bedding Compaction 142 E.C.Y. $3.67 $521
Native Backfill & Compaction 304 $4.25 E.C.Y. $1,292
Water Compaction 304 E.C.Y. $2.48 $754
Hauling Excavation 535 $4.94 B.C.Y. $2,643
Abandon Existing Sewer In Place‐D 365 $5.00 L.F. $1,825 18" ‐ PVC SDR 35 365 $27.81 L.F. $10,151
Bypass Pumping‐ 18" ‐ Fixed Costs 2 Day $1,225.00 $2,450 Bypass Pumping‐ 18" ‐ Variable Costs 730 L.F.‐Day $0.30 $219 New Manholes 1 Ea. $15,000.00 $15,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 18" Gravity Main 0 Ea. $1,267.84 $0 Unaccounted‐for Items $3,179
Segment Label Laterals Diam in Depth ft
SP03448‐L8C 0 18 11.0
2/3/2015 D‐5‐57
Project: D
North Railroad
D
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
Construction (Months): 7
Project Development (Months): 6
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Project: Connection of upstream development could be different then assumed for this project. City should evaluate the need for this project based on metering and actual point of connecƟon for new projects.
Refer to the loading map to evaluate changes in the future.Alignment: No major alternaƟves idenƟfied. Design engineer should align new main to minimize bypass pumping and service interruptions.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 15 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 2440 ft of 15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $805,900
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
12 SP00072‐M2D 248 459,136 220,333 220,333 359,555 498,778 15 832,469 12 SP00074‐M2D 345 459,136 220,333 220,333 359,555 498,778 15 832,469 12 SP00075‐M2D 339 459,136 220,333 220,333 359,555 498,778 15 832,469 12 SP00076‐M2D 250 831,249 220,333 220,333 359,555 498,778 15 1,507,155 12 SP00119‐M2D 403 459,136 220,333 220,333 359,555 498,778 15 832,469 12 SP00097‐M3A 459 432,878 265,567 265,567 404,790 544,012 15 784,859 12 SP00098‐M3A 392 446,200 310,802 310,802 450,025 589,248 15 809,015 2/3/2015 D‐7‐58
Project: D
North Railroad
D
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
2/3/2015 D‐7‐59
Project: D
North Railroad
D
Utililties Capcity Study Capital Project Descriptions
7 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $644,752
Mobilization $13,540
Insurance $13,540
Survey 1% $4,513
Site Clearing 1% $4,513
SWPPP (per LF) $2 $4,880
Traffic Control (per LF) $28 $68,326
Subtotal $560,654
Construction Contingency $84,098
Project Development $96,713
Construction Phase $64,475
Project Cost $805,940
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1287 S.Y. $9.63 $12,394
Hauling Pavement 179 $6.47 L.C.Y. $1,158
Pavement Repair 1287 $64.30 S.Y. $82,754
Shoring 53005 SF Wall $0.68 $36,043
Excavation‐Trench 2701 B.C.Y. $7.67 $20,717
Pipe Bedding (sand import) 836 L.C.Y. $32.83 $27,446
Bedding Compaction 836 E.C.Y. $3.67 $3,068
Native Backfill & Compaction 1865 $4.25 E.C.Y. $7,926
Water Compaction 1865 E.C.Y. $2.48 $4,625
Hauling Excavation 3241 $4.94 B.C.Y. $16,011
Abandon Existing Sewer In Place‐C 2441 $4.00 L.F. $9,764 15" ‐ PVC SDR 35 2441 $25.13 L.F. $61,342
Bypass Pumping‐ 15" ‐ Fixed Costs 15 Day $985.00 $14,775 Bypass Pumping‐ 15" ‐ Variable Costs 36602 L.F.‐Day $0.24 $8,784 New Manholes 8 Ea. $15,000.00 $120,000
4" PVC for Sewer Laterals 75 L.F. $6.37 $478
Service Connection to 15" Gravity Main 3 Ea. $854.14 $2,562 Unaccounted‐for Items $21,492
Segment Label Laterals Diam in Depth ft
SP00072‐M2D 2 15 10.5
SP00074‐M2D 1 15 10.5
SP00075‐M2D 0 15 8.8
SP00076‐M2D 0 15 9.0
SP00097‐M3A 0 15 12.1
SP00098‐M3A 0 15 12.9
SP00119‐M2D 0 15 11.0
2/3/2015 D‐7‐60
Project: D
Between W Main St and W Church St
D
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
Construction (Months): 5
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in and 15 in. to provide sufficient capacity to meet buildout needs. Recommended project is approximately 1490 ft of 12 &240 ft of15 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $624,800
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP02743‐M5C 450 185,869 26,056 26,056 26,056 201,311 12 757,536 8 SP01226‐M5D 528 1,646,271 30,785 30,785 30,785 304,766 12 6,709,604 8 SP01225‐M5D 510 185,869 37,070 37,070 37,070 311,051 12 757,536 12 SP00185‐M5A 237 459,136 173,357 173,357 174,274 512,512 15 832,469 2/3/2015 D‐8‐61
Project: D
Between W Main St and W Church St
D
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
2/3/2015 D‐8‐62
Project: D
Between W Main St and W Church St
D
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
Construction Total $499,814
Mobilization $10,634
Insurance $10,634
Survey 1% $3,545
Site Clearing 1% $3,545
SWPPP (per LF) $2 $3,453
Traffic Control (per LF) $28 $48,338
Subtotal $434,621
Construction Contingency $65,193
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 869 S.Y. $9.63 $8,368
Hauling Pavement 120 $6.47 L.C.Y. $776
Pavement Repair 869 $64.30 S.Y. $55,877
Shoring 56507 SF Wall $0.68 $38,425
Excavation‐Trench 2668 B.C.Y. $7.67 $20,464
Pipe Bedding (sand import) 525 L.C.Y. $32.83 $17,236
Bedding Compaction 525 E.C.Y. $3.67 $1,927
Native Backfill & Compaction 2143 $4.25 E.C.Y. $9,108
Water Compaction 2143 E.C.Y. $2.48 $5,315
Hauling Excavation 3202 $4.94 B.C.Y. $15,818
Abandon Existing Sewer In Place‐B 1489 $3.50 L.F. $5,212 Abandon Existing Sewer In Place‐C 237 $4.00 L.F. $948
12" ‐ PVC SDR 35 1489 $21.03 L.F. $31,314
15" ‐ PVC SDR 35 237 $25.13 L.F. $5,956
Bypass Pumping‐ 12" ‐ Fixed Costs 8 Day $745.00 $5,960
Bypass Pumping‐ 12" ‐ Variable Costs 14891 L.F.‐Day $0.12 $1,781 Bypass Pumping‐ 15" ‐ Fixed Costs 2 Day $985.00 $1,970
Bypass Pumping‐ 15" ‐ Variable Costs 2374 L.F.‐Day $0.24 $570 New Manholes 4 Ea. $15,000.00 $60,000
4" PVC for Sewer Laterals 1725 L.F. $6.37 $10,988
Service Connection to 12” Gravity Main 69 Ea. $573.65 $39,582 Service Connection to 15" Gravity Main 0 Ea. $854.14 $0 Unaccounted‐for Items $16,880
Segment Label Laterals Diam in Depth ft
SP00185‐M5A 0 15 23.6
SP01225‐M5D 17 12 16.0
SP01226‐M5D 32 12 20.0
SP02743‐M5C 20 12 8.8
2/3/2015 D‐8‐63
Project: D
Between W Main St and W Church St
D
Utililties Capcity Study Capital Project Descriptions
8 City of Santa Maria
15%
10%
Project Development $74,972
Construction Phase $49,981
Project Cost $624,768
2/3/2015 D‐8‐64
Project: D
Santa Maria Trunk
D
Utililties Capcity Study Capital Project Descriptions
9 City of Santa Maria
Construction (Months): 5
Project Development (Months): 6
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 2410 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $829,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP03373‐M9B 107 259,260 155,466 155,466 187,278 263,166 12 582,779 10 SP03369‐M9B 339 215,304 156,229 156,229 195,241 278,328 12 483,972 10 SP03168‐M9B 292 235,853 156,992 156,992 196,004 279,092 12 530,165 10 SP03169‐M9B 224 414,145 157,655 157,655 196,667 279,755 12 930,939 10 SP03170‐M9B 129 254,751 158,910 158,910 197,922 281,010 12 572,643 10 SP03553‐M9A 270 215,304 168,459 168,459 207,471 290,559 12 483,972 10 SP03552‐M9A 375 215,304 170,426 170,426 209,438 292,526 12 483,972 10 SP02070‐M9A 317 215,304 172,682 172,682 211,694 294,782 12 483,972 10 SP02069‐M9A 353 215,304 174,332 174,332 213,344 296,432 12 483,972 2/3/2015 D‐9‐65
Project: D
Santa Maria Trunk
D
Utililties Capcity Study Capital Project Descriptions
9 City of Santa Maria
2/3/2015 D‐9‐66
Project: D
Santa Maria Trunk
D
Utililties Capcity Study Capital Project Descriptions
9 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $663,233
Mobilization $14,011
Insurance $14,011
Survey 1% $4,670
Site Clearing 1% $4,670
SWPPP (per LF) $2 $4,823
Traffic Control (per LF) $28 $67,523
Subtotal $576,725
Construction Contingency $86,509
Project Development $99,485
Construction Phase $66,323
Project Cost $829,042
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1206 S.Y. $9.63 $11,614
Hauling Pavement 169 $6.47 L.C.Y. $1,093
Pavement Repair 1206 $64.30 S.Y. $77,546
Shoring 61660 SF Wall $0.68 $41,929
Excavation‐Trench 2854 B.C.Y. $7.67 $21,890
Pipe Bedding (sand import) 720 L.C.Y. $32.83 $23,638
Bedding Compaction 720 E.C.Y. $3.67 $2,642
Native Backfill & Compaction 2134 $4.25 E.C.Y. $9,070
Water Compaction 2134 E.C.Y. $2.48 $5,292
Hauling Excavation 3425 $4.94 B.C.Y. $16,920
Abandon Existing Sewer In Place‐B 2413 $3.50 L.F. $8,446 12" ‐ PVC SDR 35 2413 $21.03 L.F. $50,745
Bypass Pumping‐ 12" ‐ Fixed Costs 15 Day $745.00 $11,175 Bypass Pumping‐ 12" ‐ Variable Costs 36173 L.F.‐Day $0.12 $4,326 New Manholes 9 Ea. $15,000.00 $135,000
4" PVC for Sewer Laterals 800 L.F. $6.37 $5,096
Service Connection to 12” Gravity Main 32 Ea. $573.65 $18,357 Unaccounted‐for Items $22,239
Segment Label Laterals Diam in Depth ft
SP02069‐M9A 4 12 16.2
SP02070‐M9A 7 12 16.5
SP03169‐M9B 2 12 8.4
SP03170‐M9B 3 12 8.8
SP03369‐M9B 3 12 12.2
SP03373‐M9B 0 12 13.2
SP03552‐M9A 7 12 14.2
SP03553‐M9A 5 12 11.2
SP03168‐M9B 1 12 10.0
2/3/2015 D‐9‐67
Project: D
S McClelland St
D
Utililties Capcity Study Capital Project Descriptions
10 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 790 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $249,700
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
6 SP02443‐M5C 98 105,073 2,075 2,075 2,075 111,666 10 410,288 6 SP02436‐M6B 348 44,454 11,981 11,981 11,981 124,864 10 173,583 8 SP02439‐M5C 338 215,134 17,277 17,277 17,277 259,281 10 390,064 2/3/2015 D‐10‐68
Project: D
S McClelland St
D
Utililties Capcity Study Capital Project Descriptions
10 City of Santa Maria
2/3/2015 D‐10‐69
Project: D
S McClelland St
D
Utililties Capcity Study Capital Project Descriptions
10 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $199,767
Mobilization $4,171
Insurance $4,171
Survey 1% $1,390
Site Clearing 1% $1,390
SWPPP (per LF) $2 $1,571
Traffic Control (per LF) $28 $21,987
Subtotal $173,711
Construction Contingency $26,057
Project Development $29,965
Construction Phase $19,977
Project Cost $249,709
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 378 S.Y. $9.63 $3,640
Hauling Pavement 53 $6.47 L.C.Y. $343
Pavement Repair 378 $64.30 S.Y. $24,305
Shoring 15622 SF Wall $0.68 $10,623
Excavation‐Trench 676 B.C.Y. $7.67 $5,185
Pipe Bedding (sand import) 212 L.C.Y. $32.83 $6,960
Bedding Compaction 212 E.C.Y. $3.67 $778
Native Backfill & Compaction 464 $4.25 E.C.Y. $1,972
Water Compaction 464 E.C.Y. $2.48 $1,151
Hauling Excavation 811 $4.94 B.C.Y. $4,006
Abandon Existing Sewer In Place‐A 785 $3.00 L.F. $2,355 10" ‐ PVC SDR 35 785 $17.94 L.F. $14,083
Bypass Pumping‐ 10" ‐ Fixed Costs 5 Day $585.00 $2,925
Bypass Pumping‐ 10" ‐ Variable Costs 3926 L.F.‐Day $0.10 $393 New Manholes 3 Ea. $15,000.00 $45,000
4" PVC for Sewer Laterals 350 L.F. $6.37 $2,230
Service Connection to 10” Gravity Main 14 Ea. $461.57 $6,462 Unaccounted‐for Items $6,621
Segment Label Laterals Diam in Depth ft
SP02436‐M6B 1 10 11.4
SP02439‐M5C 10 10 9.1
SP02443‐M5C 3 10 7.8
2/3/2015 D‐10‐70
Project: D
Biscayne St
D
Utililties Capcity Study Capital Project Descriptions
11 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 200 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $86,400
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP03876‐L7C 203 156,903 0 57,316 114,632 238,856 12 639,478 2/3/2015 D‐11‐71
Project: D
Biscayne St
D
Utililties Capcity Study Capital Project Descriptions
11 City of Santa Maria
2/3/2015 D‐11‐72
Project: D
Biscayne St
D
Utililties Capcity Study Capital Project Descriptions
11 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $69,118
Mobilization $1,500
Insurance $1,500
Survey 1% $500
Site Clearing 1% $500
SWPPP (per LF) $2 $408
Traffic Control (per LF) $28 $5,706
Subtotal $60,103
Construction Contingency $9,015
Project Development $10,368
Construction Phase $6,912
Project Cost $86,398
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 102 S.Y. $9.63 $982
Hauling Pavement 14 $6.47 L.C.Y. $91
Pavement Repair 102 $64.30 S.Y. $6,559
Shoring 1477 SF Wall $0.68 $1,004
Excavation‐Trench 68 B.C.Y. $7.67 $522
Pipe Bedding (sand import) 61 L.C.Y. $32.83 $2,003
Bedding Compaction 61 E.C.Y. $3.67 $224
Native Backfill & Compaction 7 $4.25 E.C.Y. $30
Water Compaction 7 E.C.Y. $2.48 $17
Hauling Excavation 82 $4.94 B.C.Y. $405
Abandon Existing Sewer In Place‐B 204 $3.50 L.F. $714
12" ‐ PVC SDR 35 204 $21.03 L.F. $4,290
Bypass Pumping‐ 12" ‐ Fixed Costs 1 Day $745.00 $745
Bypass Pumping‐ 12" ‐ Variable Costs 204 L.F.‐Day $0.12 $24 New Manholes 2 Ea. $15,000.00 $30,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 12” Gravity Main 0 Ea. $573.65 $0 Unaccounted‐for Items $2,380
Segment Label Laterals Diam in Depth ft
SP03876‐L7C 0 12 3.6
2/3/2015 D‐11‐73
Project: D
Between W Chapel St and W Main St
D
Utililties Capcity Study Capital Project Descriptions
12 City of Santa Maria
Construction (Months): 5
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1260 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $437,300
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP00133‐M5A 447 187,756 24,572 24,572 25,292 205,474 10 340,425 8 SP00024‐M5A 429 187,756 27,769 27,769 28,489 211,424 10 340,425 8 SP01987‐M5A 378 1,896,060 29,134 29,134 29,854 212,788 10 3,437,786 2/3/2015 D‐12‐74
Project: D
Between W Chapel St and W Main St
D
Utililties Capcity Study Capital Project Descriptions
12 City of Santa Maria
2/3/2015 D‐12‐75
Project: D
Between W Chapel St and W Main St
D
Utililties Capcity Study Capital Project Descriptions
12 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $349,851
Mobilization $7,405
Insurance $7,405
Survey 1% $2,468
Site Clearing 1% $2,468
SWPPP (per LF) $2 $2,510
Traffic Control (per LF) $28 $35,144
Subtotal $304,218
Construction Contingency $45,633
Project Development $52,478
Construction Phase $34,985
Project Cost $437,313
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 604 S.Y. $9.63 $5,817
Hauling Pavement 84 $6.47 L.C.Y. $543
Pavement Repair 604 $64.30 S.Y. $38,837
Shoring 40129 SF Wall $0.68 $27,288
Excavation‐Trench 1734 B.C.Y. $7.67 $13,300
Pipe Bedding (sand import) 339 L.C.Y. $32.83 $11,129
Bedding Compaction 339 E.C.Y. $3.67 $1,244
Native Backfill & Compaction 1395 $4.25 E.C.Y. $5,929
Water Compaction 1395 E.C.Y. $2.48 $3,460
Hauling Excavation 2081 $4.94 B.C.Y. $10,280
Abandon Existing Sewer In Place‐A 1255 $3.00 L.F. $3,765 10" ‐ PVC SDR 35 1255 $17.94 L.F. $22,515
Bypass Pumping‐ 10" ‐ Fixed Costs 6 Day $585.00 $3,510
Bypass Pumping‐ 10" ‐ Variable Costs 7531 L.F.‐Day $0.10 $753 New Manholes 4 Ea. $15,000.00 $60,000
4" PVC for Sewer Laterals 1075 L.F. $6.37 $6,848
Service Connection to 10” Gravity Main 43 Ea. $461.57 $19,848 Unaccounted‐for Items $11,753
Segment Label Laterals Diam in Depth ft
SP00024‐M5A 11 10 16.1
SP00133‐M5A 14 10 15.8
SP01987‐M5A 18 10 16.0
2/3/2015 D‐12‐76
Project: D
Between W Mill St and W Chapel St
D
Utililties Capcity Study Capital Project Descriptions
13 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interruptions.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 1240 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $436,200
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP01783‐M5B 458 187,756 26,026 26,026 26,026 194,910 10 340,425 8 SP00704‐M5A 449 187,756 29,419 29,419 29,419 204,476 10 340,425 8 SP01203‐M5A 329 187,756 33,716 33,716 33,716 208,774 10 340,425 2/3/2015 D‐13‐77
Project: D
Between W Mill St and W Chapel St
D
Utililties Capcity Study Capital Project Descriptions
13 City of Santa Maria
2/3/2015 D‐13‐78
Project: D
Between W Mill St and W Chapel St
D
Utililties Capcity Study Capital Project Descriptions
13 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $348,945
Mobilization $7,397
Insurance $7,397
Survey 1% $2,466
Site Clearing 1% $2,466
SWPPP (per LF) $2 $2,477
Traffic Control (per LF) $28 $34,672
Subtotal $303,430
Construction Contingency $45,515
Project Development $52,342
Construction Phase $34,894
Project Cost $436,181
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 597 S.Y. $9.63 $5,749
Hauling Pavement 83 $6.47 L.C.Y. $537
Pavement Repair 597 $64.30 S.Y. $38,387
Shoring 34255 SF Wall $0.68 $23,293
Excavation‐Trench 1480 B.C.Y. $7.67 $11,352
Pipe Bedding (sand import) 334 L.C.Y. $32.83 $10,965
Bedding Compaction 334 E.C.Y. $3.67 $1,226
Native Backfill & Compaction 1146 $4.25 E.C.Y. $4,871
Water Compaction 1146 E.C.Y. $2.48 $2,842
Hauling Excavation 1775 $4.94 B.C.Y. $8,769
Abandon Existing Sewer In Place‐A 1239 $3.00 L.F. $3,717 10" ‐ PVC SDR 35 1239 $17.94 L.F. $22,228
Bypass Pumping‐ 10" ‐ Fixed Costs 6 Day $585.00 $3,510
Bypass Pumping‐ 10" ‐ Variable Costs 7429 L.F.‐Day $0.10 $743 New Manholes 4 Ea. $15,000.00 $60,000
4" PVC for Sewer Laterals 1475 L.F. $6.37 $9,396
Service Connection to 10” Gravity Main 59 Ea. $461.57 $27,233 Unaccounted‐for Items $11,741
Segment Label Laterals Diam in Depth ft
SP00704‐M5A 20 10 13.9
SP01203‐M5A 17 10 13.8
SP01783‐M5B 22 10 13.8
2/3/2015 D‐13‐79
Project: D
Between W Pershing St and W Camino Colegio Rd
D
Utililties Capcity Study Capital Project Descriptions
14 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
No major alternative identified for this project. The design engineer could evaluate trenchless technologies for alternative construction methods.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 860 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $310,000
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP02031‐M6C 190 109,480 97,844 97,844 104,807 144,173 10 198,500 8 SP01944‐M6C 199 118,748 104,631 104,631 111,593 150,960 10 215,304 8 SP02467‐M6C 207 118,748 106,053 106,053 113,015 152,381 10 215,304 8 SP02466‐M6C 265 118,748 106,492 106,492 113,454 152,820 10 215,304 2/3/2015 D‐14‐80
Project: D
Between W Pershing St and W Camino Colegio Rd
D
Utililties Capcity Study Capital Project Descriptions
14 City of Santa Maria
2/3/2015 D‐14‐81
Project: D
Between W Pershing St and W Camino Colegio Rd
D
Utililties Capcity Study Capital Project Descriptions
14 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $247,965
Mobilization $5,270
Insurance $5,270
Survey 1% $1,757
Site Clearing 1% $1,757
SWPPP (per LF) $2 $1,727
Traffic Control (per LF) $28 $24,184
Subtotal $215,622
Construction Contingency $32,343
Project Development $37,195
Construction Phase $24,797
Project Cost $309,956
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 416 S.Y. $9.63 $4,006
Hauling Pavement 58 $6.47 L.C.Y. $375
Pavement Repair 416 $64.30 S.Y. $26,749
Shoring 27468 SF Wall $0.68 $18,678
Excavation‐Trench 1187 B.C.Y. $7.67 $9,104
Pipe Bedding (sand import) 233 L.C.Y. $32.83 $7,649
Bedding Compaction 233 E.C.Y. $3.67 $855
Native Backfill & Compaction 954 $4.25 E.C.Y. $4,055
Water Compaction 954 E.C.Y. $2.48 $2,366
Hauling Excavation 1425 $4.94 B.C.Y. $7,040
Abandon Existing Sewer In Place‐A 864 $3.00 L.F. $2,592 10" ‐ PVC SDR 35 864 $17.94 L.F. $15,500
Bypass Pumping‐ 10" ‐ Fixed Costs 5 Day $585.00 $2,925
Bypass Pumping‐ 10" ‐ Variable Costs 4319 L.F.‐Day $0.10 $432 New Manholes 4 Ea. $15,000.00 $60,000
4" PVC for Sewer Laterals 200 L.F. $6.37 $1,274
Service Connection to 10” Gravity Main 8 Ea. $461.57 $3,693 Unaccounted‐for Items $8,365
Segment Label Laterals Diam in Depth ft
SP01944‐M6C 4 10 15.6
SP02466‐M6C 0 10 16.6
SP02467‐M6C 4 10 16.3
SP02031‐M6C 0 10 14.8
2/3/2015 D‐14‐82
Project: D
Sunrise Dr
D
Utililties Capcity Study Capital Project Descriptions
15 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 12 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 300 ft of 12 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $95,400
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
10 SP03180‐M9C 304 127,375 101,297 101,297 101,297 143,572 12 286,322 2/3/2015 D‐15‐83
Project: D
Sunrise Dr
D
Utililties Capcity Study Capital Project Descriptions
15 City of Santa Maria
2/3/2015 D‐15‐84
Project: D
Sunrise Dr
D
Utililties Capcity Study Capital Project Descriptions
15 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $76,303
Mobilization $1,589
Insurance $1,589
Survey 1% $530
Site Clearing 1% $530
SWPPP (per LF) $2 $609
Traffic Control (per LF) $28 $8,529
Subtotal $66,351
Construction Contingency $9,953
Project Development $11,445
Construction Phase $7,630
Project Cost $95,379
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 152 S.Y. $9.63 $1,464
Hauling Pavement 21 $6.47 L.C.Y. $136
Pavement Repair 152 $64.30 S.Y. $9,774
Shoring 7606 SF Wall $0.68 $5,172
Excavation‐Trench 352 B.C.Y. $7.67 $2,700
Pipe Bedding (sand import) 91 L.C.Y. $32.83 $2,988
Bedding Compaction 91 E.C.Y. $3.67 $334
Native Backfill & Compaction 261 $4.25 E.C.Y. $1,109
Water Compaction 261 E.C.Y. $2.48 $647
Hauling Excavation 422 $4.94 B.C.Y. $2,085
Abandon Existing Sewer In Place‐B 305 $3.50 L.F. $1,068 12" ‐ PVC SDR 35 305 $21.03 L.F. $6,414
Bypass Pumping‐ 12" ‐ Fixed Costs 2 Day $745.00 $1,490
Bypass Pumping‐ 12" ‐ Variable Costs 609 L.F.‐Day $0.12 $73 New Manholes 1 Ea. $15,000.00 $15,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 12” Gravity Main 0 Ea. $573.65 $0 Unaccounted‐for Items $2,523
Segment Label Laterals Diam in Depth ft
SP03180‐M9C 0 12 12.5
2/3/2015 D‐15‐85
Project: D
Between Skyway Dr and Industrial Pky
D
Utililties Capcity Study Capital Project Descriptions
16 City of Santa Maria
Construction (Months): 4
Project Development (Months): 5
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 10 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 810 ft of 10 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $296,900
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
8 SP03514‐L9C 468 124,543 118,708 118,708 118,708 126,964 10 225,812 8 SP03513‐L9C 340 229,954 122,214 122,214 122,214 130,470 10 416,934 2/3/2015 D‐16‐86
Project: D
Between Skyway Dr and Industrial Pky
D
Utililties Capcity Study Capital Project Descriptions
16 City of Santa Maria
2/3/2015 D‐16‐87
Project: D
Between Skyway Dr and Industrial Pky
D
Utililties Capcity Study Capital Project Descriptions
16 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $237,543
Mobilization $5,064
Insurance $5,064
Survey 1% $1,688
Site Clearing 1% $1,688
SWPPP (per LF) $2 $1,617
Traffic Control (per LF) $28 $22,644
Subtotal $206,559
Construction Contingency $30,984
Project Development $35,631
Construction Phase $23,754
Project Cost $296,929
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 390 S.Y. $9.63 $3,756
Hauling Pavement 54 $6.47 L.C.Y. $349
Pavement Repair 390 $64.30 S.Y. $25,077
Shoring 38805 SF Wall $0.68 $26,387
Excavation‐Trench 1677 B.C.Y. $7.67 $12,863
Pipe Bedding (sand import) 218 L.C.Y. $32.83 $7,157
Bedding Compaction 218 E.C.Y. $3.67 $800
Native Backfill & Compaction 1459 $4.25 E.C.Y. $6,201
Water Compaction 1459 E.C.Y. $2.48 $3,618
Hauling Excavation 2013 $4.94 B.C.Y. $9,944
Abandon Existing Sewer In Place‐A 809 $3.00 L.F. $2,427 10" ‐ PVC SDR 35 809 $17.94 L.F. $14,513
Bypass Pumping‐ 10" ‐ Fixed Costs 4 Day $585.00 $2,340
Bypass Pumping‐ 10" ‐ Variable Costs 3235 L.F.‐Day $0.10 $324 New Manholes 3 Ea. $15,000.00 $45,000
4" PVC for Sewer Laterals 0 L.F. $6.37 $0
Service Connection to 10” Gravity Main 0 Ea. $461.57 $0 Unaccounted‐for Items $8,038
Segment Label Laterals Diam in Depth ft
SP03514‐L9C 0 10 33.8
SP03513‐L9C 0 10 10.5
2/3/2015 D‐16‐88
Project: D
Between W Fesler St and W Mill St
D
Utililties Capcity Study Capital Project Descriptions
17 City of Santa Maria
Construction (Months): 6
Project Development (Months): 6
Need for Project:
Pipeline has inadequate capacity at Build‐out. See table below for capacity information for each segment included in the project.
Alternatives:
Alignment: No major alternatives identified. Design engineer should align new main to minimize bypass pumping and service interrupƟons.
Construction: Possible candidate for trenchless rehabilitation. Design engineer should evaluate feasibility, cost and benefits of trenchless construction for this project.
Recommended Solution:
*Capacity is shown in Average Daily Flow (ADF) equivalence. ADF equivalence is calculated by determining the peak capacity of the pipeline (established as 0.6 d/D for <12 in and 0.75 d/D for =>12 in) and dividing the peak flow capacity by the peak hour wet weather flow factor of 2.0 to arrive at the ADF equivalent pipe capacity. This allows a simple comparison between ADF and pipe capacity.
It is recommended that the lines be upgraded to 8 in to provide sufficient capacity to meet buildout needs.
Recommended project is approximately 3710 ft of 8 in pipeline. See next page for map of project location.
Opinion of Total Project Cost: $1,108,300
Current
Dia (in)
Current Capacity
ADF (gpd)*
Propsed
Dia (in)
Upgrade
Capacity ADF
(gpd)*
Projected 0‐5
ADF (gpd)
Projected 5‐10
ADF (gpd)
Projected
Build Out ADF
(gpd)
Segment Label Length (ft) Existing Flow
(gpd)
6 SP00533‐M5B 35 44,454 16,637 16,637 19,277 54,432 8 95,737 6 SP00534‐M5B 369 44,454 18,060 18,060 20,700 55,856 8 95,737 6 SP00510‐M5B 450 44,454 20,737 20,737 23,377 68,325 8 95,737 6 SP01699‐M5B 409 88,908 23,150 23,150 25,790 80,530 8 191,475 6 SP00330‐M5B 414 86,305 24,893 24,893 27,533 92,120 8 185,869 6 SP00331‐M5B 448 85,420 26,498 26,498 29,138 103,570 8 183,963 6 SP00702‐M5A 450 87,182 30,251 30,251 32,891 107,324 8 187,756 6 SP00703‐M5A 352 86,305 33,917 33,917 36,557 110,989 8 185,869 6 SP01831‐M5A 406 91,437 37,463 37,463 40,103 114,535 8 196,920 6 SP02108‐M5A 368 164,494 41,494 41,494 44,134 118,566 8 354,258 2/3/2015 D‐17‐89
Project: D
Between W Fesler St and W Mill St
D
Utililties Capcity Study Capital Project Descriptions
17 City of Santa Maria
2/3/2015 D‐17‐90
Project: D
Between W Fesler St and W Mill St
D
Utililties Capcity Study Capital Project Descriptions
17 City of Santa Maria
JLD
JHR
Prepared By:
Reviewed By: Opinion of Probable Construction Cost
15%
10%
15%
Construction Total $886,663
Mobilization $18,329
Insurance $18,329
Survey 1% $6,110
Site Clearing 1% $6,110
SWPPP (per LF) $2 $7,411
Traffic Control (per LF) $28 $103,755
Subtotal $771,011
Construction Contingency $115,652
Project Development $132,999
Construction Phase $88,666
Project Cost $1,108,328
3%
3%
Item Description Quantity Unit Units Total Cost Item Cost Sawcut & Remove 1714 S.Y. $9.63 $16,506
Hauling Pavement 239 $6.47 L.C.Y. $1,546
Pavement Repair 1714 $64.30 S.Y. $110,210
Shoring 112275 SF Wall $0.68 $76,347
Excavation‐Trench 4504 B.C.Y. $7.67 $34,546
Pipe Bedding (sand import) 894 L.C.Y. $32.83 $29,350
Bedding Compaction 894 E.C.Y. $3.67 $3,281
Native Backfill & Compaction 3610 $4.25 E.C.Y. $15,343
Water Compaction 3610 E.C.Y. $2.48 $8,953
Hauling Excavation 5405 $4.94 B.C.Y. $26,701
Abandon Existing Sewer In Place 3706 $2.00 L.F. $7,412
8" ‐ PVC SDR 35 3706 $12.95 L.F. $47,993
Bypass Pumping‐ 8" ‐ Fixed Costs 19 $425.00 Day $8,075
Bypass Pumping‐ 8" ‐ Variable Costs 70405 $0.08 L.F.‐Day $5,632 New Manholes 9 Ea. $15,000.00 $135,000
4" PVC for Sewer Laterals 4075 L.F. $6.37 $25,958
Service ConnecƟon to 8” Gravity Main 163 $178.05 Ea. $29,022 Unaccounted‐for Items $29,094
Segment Label Laterals Diam in Depth ft
SP00330‐M5B 18 8 14.8
SP00331‐M5B 16 8 15.0
SP00510‐M5B 21 8 15.0
SP00533‐M5B 0 8 11.6
SP00534‐M5B 20 8 12.7
SP00702‐M5A 13 8 14.8
SP00703‐M5A 16 8 14.7
SP01699‐M5B 25 8 14.6
SP01831‐M5A 20 8 15.8
SP02108‐M5A 14 8 19.5
2/3/2015 D‐17‐91
City of Santa Maria Appendix F Utilities Capacity Study
F
RECOMMENDED SEWER COLLECTION SYSTEM CAPITAL
PROJECTS MAP
See “Sewer System CIP Map” large exhibit attached to this report.
A-4
D-11
A-5
D-15
D-10
D-5
B-1
C-4
C-7
C-8
C-6
A-2
A-3
D-16
D-14
C-2
A-6
D-12 C-5
C-3
D-8
C-1
D-9
D-7
D-17
A-1 D-2
D-4
D-1
D-13
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp., NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
City of Santa Maria
Utilities Capacity Study
Sewer System CIP
±
Legend
Manholes
Sewer System
Sewer System (Not CIP)
CIP Pipeline Priority
Exceeds Current Capacity
Exceeds Capacity-0-5-PHF
Exceeds Capacity-5-10-PHF
Exceeds Capacity-Build-Out
0 2,500 5,000
Feet
Name: Santa_Maria_CIP_Project_Map Date: 2/3/2015
Project Name
Total
Length
(ft)
Diam
(in)
Total Project
Cost
A1 Dejoy Phase II 5,520 36 $3,866,000
A2 Knudsen Way 660 18 $257,000
A3 E Cook St 720 15 $251,000
A4 McCoy Ln and CA-135
Intersection 100 15 $54,000
A5 Between W Creston St
and CA-135 230 12 $116,000
A6 Between S Airpark Dr
and Skyway Dr 1,090 12 $348,000
B1 W Main St 50 21 $26,000
C1 Parallel to W Main St 1,920 36 $1,483,000
C2 E Tunnel St 550 15 $225,000
C3 East Fesler St 1,700 15 $1,112,000
C4 Between Channel Dr
and Preisker Ln 440 15 $166,000
C5 Alcala Dr 1,400 12 $531,000
C6 Rowland Dr 560 12 $181,000
C7 W Camino Colegio Rd 500 12 $170,000
C8 Elaine Ave 520 8 $141,000
D1 Southwest Trunk 13,320 42 $11,675,000
D2 West Main Trunk 4,880 36 $3,510,000
D4 W La Brea Ave 5,230 21 $2,035,000
D5 W McCoy Ln 370 18 $119,000
D7 North Railroad 2,440 15 $806,000
D8 Between W Main St and
W Church St 1,730 12 $625,000
D9 Santa Maria Trunk 2,410 12 $829,000
D 10 S McClelland St 790 10 $250,000
D 11 Biscayne St 200 12 $86,000
D 12 Between W Chapel St
and W Main St 1,260 10 $437,000
D 13 Between W Mill St and
W Chapel St 1,240 10 $436,000
D 14
Between W Pershing St
and W Camino Colegio
Rd
870 10 $310,000
D 15 Sunrise Dr 300 12 $95,000
D 16 Between Skyway Dr
and Industrial Pky 810 12 $297,000
D 17 Between W Fesler St
and W Mill St 3,710 8 $1,108,000
Footnote
Total project cost includes the following: an added 15% construction contingency, an added 10% cost for the construction phase, and an added 15% for project development
Project List
City of Santa Maria Appendix G Utilities Capacity Study
G
SEWER SYSTEM BUILD‐OUT IMPACT MAP
See “Build‐Out Flow Impact Map” large exhibit attached to this report.
Santa Maria
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
£¤101
ST1
ST135
ST166
ST176
ST135
ST135
ST166
ST135
ST ST166
166
ST135
ST135
ST166
ST135
ST166
ST166
ST135
ST135
ST1
ST ST166 166 ST166
ST135
ST135
ST135
ST135
ST1
ST166
ST166
ST135
ST135
ST166
ST166
ST166
ST135
ST ST166
166
ST135
ST166
ST166
ST1
ST166
ST135
ST135
ST135
ST135
ST135
ST1
ST135
ST135
ST135
ST135
ST166
ST176
ST135
ST135
ST166
ST166
ST135
ST135
ST135
ST135
ST135
ST135
ST135
ST166
ST166
ST135
ST ST176 176
ST135
ST135
ST135
ST135
ST166 ST166
ST135
ST135
ST176 ST135
ST135
ST135
ST135
ST166
ST176
ST176
ST166 ST176
ST135
ST135
ST166
ST135
ST135
ST135
ST135
ST135
ST166
ST166
ST135
ST166
ST166
ST135
ST135
ST135
ST135
ST166
ST135
ST135
ST135
ST135
ST166
ST176
ST135
ST135
ST135
ST166
ST176
ST135
ST135
ST166
ST1
ST135
ST135
ST135
ST135
ST135
ST135
ST166
ST135
ST135
ST135
ST135
ST166
ST135
ST135
ST135
ST135
ST135
ST135
ST135
ST135
ST135
ST135
ST166
ST135
ST135
ST166
ST135
ST135
ST135
ST135
ST135
ST135
ST135HWY 135
Rosemary Rd
California Blvd
W Betteravia Rd
Blosser Rd
S Bradley Rd
E Betteravia Rd
N Blosser Rd
E Main St
S Miller St
E Stowell Rd
N Miller St
Bradley Rd
Suey Rd
Bull
Canyon Rd
E Foster Rd
Lakeview Rd
Mahoney Rd
S Blosser Rd
W Foster Rd
Suey Crossing Rd
Miller St
Black Rd
Santa Maria Way
W Donovan Rd
W Alvin Ave
W Stowell Rd
E Donovan Rd
E Alvin Ave
Skyway Dr
W Stowell Rd
Santa Maria Way
S Blosser Rd
S Miller St
Bul l C a nyon Rd
Skyway Dr
Skyway Dr
W Betteravia Rd
S Miller St
Bradley Rd
Skyway Dr
N Blosser Rd
Santa Maria Way
E Alvin Ave
S Blosser Rd
Miller St S Miller St
S Blosser Rd
Black Rd
Black Rd
HWY 135
Black Rd
S Miller St
W Betteravia Rd
E Stowell Rd
W Betteravia Rd
S M il le r St
Mahoney Rd
Lakeview Rd
S Bradley Rd
Skyway Dr
Suey Rd
Skyway Dr
Black Rd
Califo
rnia Blvd
S Blosser Rd
Mahoney Rd
Bradley Rd
Skyway Dr
Suey Rd Black Rd
Sk y wa y Dr
E Betteravia Rd
Black Rd
Black Rd
Bradley Rd
Black Rd
W Betteravia Rd
E Stowell Rd
E Donovan Rd
Black Rd Black Rd
Rosemary Rd
Black Rd
W Foster Rd
Rosemary Rd
Black Rd Black Rd
Rosemary Rd
E Betteravia Rd
Dutard St
Founders Ave
Prell Rd
Crew Ln
Bush Ln
F St
Pade n St
Siler Ln
Polk St
Plaza Dr W Stowell Rd Easy St
Fremont St
E St
B St
Majestic Dr
Hana
St
Amber Ln
White Ct
Revere St
Valley Dr
Battles Rd Appaloosa Trl
W Taft St
Elmwood Dr
Hagerman Ln
Dutard Rd
Lark St
Courtney Dr
Erin Ct
Kris Dr
Berry Ln
Provance Ave
Vineland Dr
Lolita Ln
Teakwood Dr
E Cox Ln
Casmalia Rd
Kari Ln
Paint Horse Trl
Divide Way
Lauren Ln
Stockton St
Union Valley Pky
Bluebird St
Sheila Ln
Nita Ct
Schuman Pl
Wildh aven Cir
Pabst Ln
Hadley Way
Primrose Ln
Sequoia Dr
Koval Ln
Beverly Dr
Baldwin Way
Ka
pa
lua
Dr
Mary Dr
West St
Lazo Way
Lilac St
Larkspur Dr
Patti Ln
Curtis Ct
Sutter St
Marsala Ave
Harsin Ln
La Brea Ave
Ivory Dr
Bonita Lateral Rd
Glen view Dr
Rita Ln
Eagle Ct
Riverton Dr
Rimes Ct
Sand Hill Ln
Dahlia Pl
S Walnut Dr
Amy
Way
Arriba Way
Chadwell Dr
W Williams St
VIA Carro
Cypress Way
Fiesta Way
Mario tt Rd
Bridle Trails Ln
Odie Ln
Evelyn Ct
Barrett St
Foster Rd
S Barbara St
Ybarra
Ave
N Palisade Dr
Gunner St
Cat Ln
Canyon Dr
S Hart Dr
Damask Ct
Loma Way
Eastwood Dr Valerie St
Fair Oaks Dr
E Lily Ln
Wisteria Dr
VIA Nuevo
Manor Ln
Kingston Dr
Nightshade Ln
Flower St
Ebony St
Raven Ct
VIA Establo
Goodwin Rd
Shay Ave
Tilbury Ct
Martin Ave
Louisa Ter
W Creston St
Linda Dr
Prescott Ln
Dena Way
A St
Yale Pl
Palomino Dr
Sumner Pl
Biscayne St
Sunnyside Ave
W Sunset Ave
Hilltop Rd
Stansbury Dr
Bluejay Dr
Dal Porto Ln
VIA Nina Aviation Way Iliff Ln
Firefox Dr
Laguna Ave
Townsend Ln
S Depot St
Tyler Dr
Sara Ct
S Ranch St
Jackie Ln
Rutgers Dr
Spencer Dr
Poppy Ln
Sunshine Ct
W Mariposa Way
Sandy Ct
N Walnut Dr
Adler Ct
N Hart Dr
W Jewel St
Kameo St
Acacia St
Flagstone Dr
Avola Ave
Melanie Ct
Manda Dr
Cortez Dr
S Oakley Ave
Brandy Ct
Edgewood Ave
Ventura Rd
Rain Tree Dr
Avila Way
Savoy Dr
E Taylor St
Edenbury Dr
Camlin Ct
Balboa Dr
N
Ranch St
Thompson Way
Elm Ave
Kathleen Ct
Lahr Ln
Southside Pky
Rios Ct
Charlotte Dr
E Mccoy Ln
Depot St
Mi Tierra Ln
E Monroe St
Menusa Ct
Jason Way
Rachel Dr
La Verne Ave
San Luis Dr
Shepard Dr
Gem Ct
Patterson Rd
Logan Dr
Shirley Ln
Paraiso Dr
De Soto Dr
Haslam Dr
Sandpiper Dr
Beverly Ct
N Oakley Ave
Talmadge Rd
Costa Pl
Tabitha Ln
Hill Ct
Radcliff Ln
Montano Dr
Raaberg Way
Earl Ln
Parkview S
Amethyst Dr
Ree
St
Les Maisons Dr
Flora Way
Turquoise Ct
Parkview St
Shelley Ct
S Scott Dr
Wailea Ct
Locust St
Winston Dr
Naratez Ct
Glen Eagles Dr
Citation Ct
VIA Visalia
Coachman Way
Niles
Ct
Dakota Dr
Tree Line Dr
W Mill St
Wedgewood Dr
E Cook St Rio Vista Ln
Fern Ln
Annie Way
Glines Ave
Garden Dr
N Blosser Rd
Red Bark Rd
Forest Cir
N Benwiley Ave
North Ave
Village Ct
Pleman Pl
Covey Ln
Molera Dr
Bicknell Ave
Columbus Dr
Bristol Ct Hanson Way
Alison Ave
Burlington Dr
Professional Pky
Lassen Dr
Coral Dr
Tallyho Rd
Fairmont Ave
Lockwood Ln
Re
gina Ct
Parkview N
Rod Dr
E Jones St
Lupin Ln
S Mcclelland St
Farnel Rd
N Bonita St
Del Sur
W Monroe St
Harrison Dr
Humbolt Dr
W Grant St
W Battles Rd
S Suey Rd
Bay Ave
Blosser Rd
E Grant St
E Orange St
S Pine St
E Creston St
Brian St
Dejoy St
Lorencita Dr
Trinity Dr
Cordoban Ln
Auto Plaza Dr
E Cypress St
Basque Dr
Drake Dr
W Cook St
Edward St
E Chapel St
Hal Ave
Dancer Ave
Quail Run
Camelo t Dr Lightning St
Ellen
Ln
Foxenwood Ln
Industrial Pky
Poplar St
Golden Dr
Cain Dr
Dickson Dr
W Lee Dr
E Las Flores Way
Blue Ridge Dr
Vine St
E Williams St
Meredith Ln
Kit Way
Oak Knoll Rd
Cesar E Chavez Dr
E Jewel St
Sonya Ln
Espalier Dr
E Foster Rd
Marv ni St
Roble St
Air Park Dr
S Lincoln St
Woodlawn Dr
S Thornburg St
VIA Rosa
W Cox Ln
Robert Ln
Myrtlewood Rd
Airpark Dr
Boardwalk Ln
Knudsen Way
Doverlee Dr
11Th St
Rosita Ave
La Costa Dr
W Las Flores Way Sierra Vis
W CAMINO Colegio
Big Pine Dr
Estes Dr
Termin al Dr
Windsor St
Suey Rd
Blue Lake Dr
S Blosser Rd
Hillv ei w Rd
H ummel Dr
Riverside Ct
Sandalwood Dr
Ironwood Dr
Tanglewood Dr
Morn ingside Dr
Frank Ln Mitchell Rd
Mitchell St Wilson Dr
Village Dr
Signal Ave
Mccloud St
Liberty St Teelynn Ave Darbeton Ave
W Donovan Rd
Inger Dr
Jill St
E Boone St
E Mill St
Hartnell Rd
W Church St
W Cypress St
Tama Ln
Fairway Dr
Carmen Ln
Juleston Dr
Craig D r
Oak St
W Orange St
Preisker Ln
W Boone St
Sierra Madre Ave
E Battles Rd
Daniel Dr
Agnes Ave
Foxenwood
Dr
E Church St
E Park Ave E Newlove Dr
Pershing St
Crestmont Dr
E Fesler St
S Smith St
Cambria Ave
Roemer Way
Speed St
W Bunny Ave
W Morrison Ave Bentley Ave
E Bunny Ave
E Sunset Ave
E Orchard St
Central Ave
W Orchard St
W Mccoy Ln
S College Dr
W Hermosa St
N Western Ave
W El Camino St
E Mariposa Way
Concord Ave
Drake Dr
A St
W Cook St
W Orchard St
A St A St
W Lee Dr
Airpark Dr
W Cypress St
W Taft St
Battles Rd
Tallyho Rd
Vine St
E Battles Rd
Fremont St
Bonita Lateral Rd
E Jones St
Sonya Ln A St
S Lincoln St
Kris Dr
N Western Ave
E St
Patterson Rd
Kapalua Dr
A St
E Jo nes St
E St
Fairway Dr
Blosser Rd
Jackie Ln
Brian St
Prell Rd
Central Ave S College Dr
W Stowell Rd
S Depot St
Sonya Ln
Industrial Pky
Ivory Dr
E St
E St
Polk St
E Jewel St
E Cook St
Plaza Dr
S Mcclelland St
Valerie St
Fremont St
Fairmont Ave
Mitchell St
S Pine St
E Jones St
E St
Battles Rd
W Stowell Rd W Stowell Rd
Hanson Way
Hana St
Patterson Rd
Santa Maria River
Suey Cre ek
Or cutt Creek
Orcutt Cre ek
Orcutt Creek
Santa Maria
Public Airport-Captain
G Allan
Hancock
Allan Hancock
College
Righetti High
School
Saint Joseph
High School
Lakeview Junior
High School
Valley Christian
Academy
Santa Maria
Town Center
Rancho Maria
Golf Course
Santa Maria
Country Club
Sunset Ridge
Golf Center
Waller Park
Pioneer Park
Preisker Park
Alice Threfts
Park
± 0 2,500 5,000
CSM Sewer System Feet
Build-out Flow Impact Map
Date: 2/4/2015 Path: W:\GIS\CSM\UtilityMasterPlanUpdate_2012\Sewer Model\SewerGEMS\BOFlowIncreaseMap.mxd Legend
Build-out Flow Increase (gpd)
0 1 - 255,978
255,979 - 868,716
868,717 - 2,473,881
2,473,882 - 4,429,252
Buildout Sewer Generation Scale (gpd)
0-14,888
14,888-40,113
40,113-87,696
87,696-197,451
197,451-1,105,443
Zoning Categories
R-1
R-2
R-3
RMH
RSL-1
C-1
C-2
CC
CM
CPO
HC
FS
M-1
M-2
AS-II
OS
PF
SP
(Zero or negative slope)
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 6: Liquid Treatment Approach
for Addressing General Order
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 6: Liquid Treatment Approach
for Addressing General Order
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.24 11:17:03-07'00'
Digitally signed by Daniel L. Meacham
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.25 08:23:31-05'00'
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 6/_Cover-SealPage-TOC-Abbrev.docx Contents
CHAPTER 1 SCREENING AND EVALUATION OF LIQUID TREATMENT
PROCESS ALTERNATIVES
1.1 Background and Introduction 1-1
1.2 Screening of Technologies 1-3
1.2.1 Identification of Potential Technologies 1-3
1.2.2 Screening Criteria for Technologies 1-3
1.2.3 Screening Results 1-4
1.3 Liquid Treatment Alternatives Analysis 1-7
1.3.1 Development of Alternatives 1-7
1.3.2 Influent Conditions 1-8
1.3.3 Description of Alternatives 1-8
1.3.4 Alternatives Sizing Criteria 1-11
1.4 Summary 1-14
CHAPTER 2 SCREENING AND EVALUATION OF SOLIDS TREATMENT
ALTERNATIVES
2.1 Background and Introduction 2-1
2.2 Screening of Technologies 2-3
2.2.1 Sludge Thickening 2-3
2.2.2 Sludge Digestion 2-9
2.2.3 Sludge Storage 2-11
2.2.4 Sludge Dewatering 2-13
2.3 Thickening and Dewatering Evaluations 2-18
2.3.1 Thickening Process Evaluation 2-18
2.3.2 Dewatering Process Evaluation 2-22
2.4 Recommendations and Findings 2-26
CHAPTER 3 PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION
3.1 Purpose 3-1
3.2 Background 3-1
3.3 Siting Evaluation 3-2
3.3.1 Existing Wastewater Treatment Plant Site 3-3
3.3.2 Greenfield Site 3-5
3.3.3 Hybrid Approach 3-7
3.4 Conclusions 3-7
CHAPTER 4 CAPITAL AND O&M COST DEVELOPMENT
4.1 Purpose 4-2
4.2 Background 4-2
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
4.3 Level of Accuracy 4-4
4.4 Capital Costs 4-4
4.5 Operations and Maintenance Costs 4-9
4.6 Present Value Life-Cycle Cost 4-10
4.7 Conclusions 4-12
CHAPTER 5 TREATMENT ALTERNATIVE SELECTION
5.1 Purpose 5-1
5.2 Selection of Final WWTP Upgrades 5-1
5.2.1 Liquid Treatment Processes 5-1
5.2.2 Solids Treatment Processes 5-5
5.3 Selection of Final WWTP Site 5-8
5.4 Updated Project Costs 5-12
5.5 Conclusions 5-14
CHAPTER 6 PROJECT DESCRIPTION
6.1 Introduction and Purpose 6-1
6.1.1 Project Applicant 6-1
6.1.2 Project Location 6-1
6.2 Existing Wastewater Treatment Plant Operations 6-5
6.3 Proposed Project Characteristics 6-5
6.4 Near-Term Projects 6-7
6.4.1 Temporary Tertiary Filtration 6-7
6.4.2 Dewatering Facility 6-8
6.4.3 Project 1 - Percolation Pond Construction 6-8
6.5 Wastewater Treatment Plant Phase 1 Upgrades 6-10
Appendices
APPENDIX A DETAILED SCREENING RESULTS
APPENDIX B PROCESS MODELING OF LIQUID TREATMENT ALTERNATIVES
APPENDIX C PRELIMINARY LAYOUTS
APPENDIX D OPERATIONS AND MAINTENANCE COSTS
Tables
Table 1.1 Summary of Previous Discharge Requirements (Order No. R3-2010-000) 1-1 Table 1.2 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 2033 1-2
Table 1.3 Summary of New Discharge Limits (Order No. R3-2020-0020) Effective June 2033 1-2
Table 1.4 Screening Criteria 1-3
Table 1.5 Summary of Selected Technologies 1-5
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Table 1.6 Influent Conditions 1-8
Table 1.7 Planning Level Sizing Criteria for Selected Liquid Treatment Process Alternatives 1-12
Table 2.1 Solids Treatment Processes Suitable for Use in Evaluated Liquid Treatment Alternatives 2-2
Table 2.2 Dewatering Centrifuge Preliminary Design Criteria 2-15 Table 2.3 Dewatering Screw Press Preliminary Design Criteria 2-16 Table 2.4 BFP Preliminary Design Criteria 2-17
Table 2.5 Estimated Primary Sludge and WAS Flows and Loads Summary 2-19 Table 2.6 Primary Sludge Equipment Sizing 2-19
Table 2.7 WAS Thickening Equipment Sizing 2-20
Table 2.8 Sludge Thickening Alternatives Summary 2-21
Table 2.9 Estimated Sludge Flows and Loads to Dewatering Summary 2-23 Table 2.10 Dewatering Equipment Sizing 2-24
Table 2.11 Sludge Dewatering Alternatives Summary 2-25
Table 2.12 Solids Treatment Train Summary 2-26
Table 3.1 Summary of Key Considerations for Each Site Location 3-8 Table 4.1 Current Raw Wastewater Characteristics Compared With Existing Design Criteria Values 4-3
Table 4.2 Alternative Treatment Train Processes Included in the Capital Cost Estimates 4-3 Table 4.3 AACE Classification of Cost Estimates 4-4
Table 4.4 Summary of Capital Costs for Treatment Alternatives on the Existing Site 4-7 Table 4.5 Summary of Capital Costs for Treatment Alternatives on the Greenfield Site 4-8 Table 4.6 Summary of Unit Costs Used to Calculate O&M Costs 4-9 Table 4.7 Summary of Annual O&M Cost for Each Treatment Alternative 4-10 Table 5.1 Revised Alternative 4 Phase 1 Cost Estimate 5-13 Table 6.1 Site Information 6-4
Table 6.2 Existing Structures at the Santa Maria WWTP 6-5 Table 6.3 Structures to be Removed During Proposed Phase 1 Project 6-6 Table 6.4 Structures to be Constructed During Proposed Phase 1 Project 6-6 Figures
Figure 1.1 MLE Extended Aeration Process Flow Schematic 1-9 Figure 1.2 Oxidation Ditch Process Flow Schematic With Primary Clarifiers 1-10 Figure 1.3 Oxidation Ditch Process Flow Schematic Without Primary Clarifiers 1-10 Figure 1.4 4-Stage Bardenpho Process Flow Schematic With Primary Clarifiers 1-11 Figure 1.5 4-Stage Bardenpho Process Flow Schematic Without Primary Clarifiers 1-11 Figure 2.1 Gravity Thickener Diagram 2-4
Figure 2.2 DAFT Diagram 2-5
Figure 2.3 RDT 2-6
Figure 2.4 GBT Diagram 2-7
Figure 2.5 Alternative 5b - Bardenpho Without Primary Clarification Using Drying Beds 2-14 Figure 2.6 Dewatering Centrifuge Diagram 2-15
Figure 2.7 Dewatering Screw Press Diagram 2-16
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Figure 2.8 Belt Filter Press 2-17
Figure 3.1 Potential Site Locations for New Treatment Facilities 3-2 Figure 3.2 Phase 1 Layout for Alternative 1 at the Existing WWTP 3-4 Figure 3.3 Phase 1 Layout for Alternative 1 on the Greenfield Site 3-6 Figure 4.1 Approach Used for Developing Capital Cost Estimates 4-5 Figure 4.2 Approach Used for Developing Major Equipment Cost Estimates 4-5 Figure 4.3 Comparison of Capital, O&M, and 30-Year NPV for All Alternatives for Two Siting Options 4-11
Figure 5.1 Phase 1 WWTP Facilities Layout 5-10
Figure 5.2 Phase 2 WWTP Facilities Layout 5-11
Figure 6.1 Proposed Project Location 6-3
Figure 6.2 Proposed Project Extents 6-4
Figure 6.3 Proposed Phase 1 (Light Blue and Orange) and Phase 2 (Dark Blue) Structures on Existing WWTP Site 6-7
Figure 6.4 Preliminary Layout of Proposed Percolation Pond Project 6-9 Figure 6.5 Phase 1 Upgrades 6-11
Figure 6.6 Phase 1 - Preliminary Arrangement for Digester Area and Truck Routing Improvements 6-11
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
Abbreviations
AAF average annual flow
ADWF average dry weather flow
AGS anaerobic granular sludge
API Atlas Performance Industries
APN Assessor's Parcel Number
BAF biologically aerated filters
BAS ballasted activated sludge
BFP belt filter presses
BNR biological nutrient removal
BOD biochemical oxygen demand
BOD5 5-day biochemical oxygen demand test
C Celsius
CaCO3 calcium carbonate
Carollo Carollo Engineers
CBOD carbonaceous biochemical oxygen demand
CEQA California Environmental Quality Act
CHP combined heat and power
City City of Santa Maria
CM construction management
COD chemical oxygen demand
DAF dissolved air flotation
DAFT dissolved air flotation thickener
DG digester gas
DO dissolved oxygen
EI&C electrical, instrumentation and control
EPA United States Environmental Protection Agency
ESDC Engineering Services During Construction
F Fahrenheit
FOG fats, oils, and grease
ft foot or feet
GBT gravity belt thickener
gpd gallons per day
gpm gallons per minute
hp horsepower
hr hour
IFAS integrated fixed film activated sludge
kWh kilowatt hour
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vi
lb pound
MG million gallons
MABR membrane aerated biofilm reactor
MBBR moving bed biofilm reactor
MBR membrane bioreactor
MG million gallons
mg/L milligrams per liter
mgd million gallons per day
mL/g milliliters per gram
mL/L milliliters per liter
MLE Modified Ludzack-Ettinger
MLR mixed liquor recirculation
MLSS mixed liquor suspended solids
N/A not applicable
NH3 ammonia
NH3-N ammonia-nitrogen
NOA Notice of Applicability
NPV net present value
NTF nitrifying trickling filter
O&M operations and maintenance
PC primary clarifier
PH peak hour
psi pounds per square inch
RAS return activated sludge
RDT rotary drum thickener
RWQCB Regional Water Quality Control Board
scfm standard cubic feet per minute1
sf square foot
SRT solids retention time
SVI sludge volume index
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TM technical memorandum
TN total nitrogen
TS total solids
TSCP Time Schedule Compliance Plan
TSS total suspended solids
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vii
USD United States dollar
WAS waste activated sludge
WEF Water Environment Federation
WT wet ton
WWTP wastewater treatment plant
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 SCREENING AND EVALUATION OF LIQUID
TREATMENT PROCESS ALTERNATIVES
1.1 Background and Introduction
The City of Santa Maria’s (City) Wastewater Treatment Plant (WWTP) is located at 601 Black Road, Santa Maria, California 93458. It is a two-stage trickling filter process designed to treat 12.5 million gallons per day (mgd) of annual average flow (AAF). The purpose of the Santa Maria WWTP is to treat wastewater to a degree so that its disposal will not endanger public health or degrade groundwater quality. The degree of treatment is set by discharge requirements established by the Central Coast Regional Water Quality Control Board (RWQCB) Region 3. The 2011 treatment plant expansion allowed the Santa Maria WWTP to comply with the waste discharge requirements Order No. R3-2010-000 with limits shown in Table 1.1.
Table 1.1 Summary of Previous Discharge Requirements (Order No. R3-2010-000) Constituent Monthly Average Daily Maximum
CBOD, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
CBOD - carbonaceous biochemical oxygen demand; mg/L - milligrams per liter; mL/L - milliliters per liter; TDS - total dissolved solids; TSS - total suspended solids
(1) Compliance shall be based on a three-year running mean.
In June 2023, the City received a Notice of Applicability (NOA) from the RWQCB for enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements, for discharges from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd). The NOA terminated Order No. R3-2010-000. The Santa Maria WWTP has been granted Interim Effluent Limits for two years, which are shown in Table 1.2. These are the same as those shown in Table 1.1, except that the effluent parameter has changed from CBOD to 5-day biochemical oxygen demand (BOD₅). Given the length of time that it will take to implement changes to the treatment process to achieve the limits required by the new Order (Table 1.3), the City has requested, as part of its Time Schedule Compliance Plan (TSCP) submitted in June 2024, that the RWQCB extend the interim limits until June 2033. The TSCP is discussed in more detail in Volume 2, Chapter 4.
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
Table 1.2 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 2033(1) Constituent Monthly Average Daily Maximum
BOD₅, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(2), mg/L 1,000 --
Sodium(2), mg/L 180 --
Chloride(2), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
(1) June 2033 timeline requested by the City in the TSCP submitted to the RWQCB in June 2024. (2) Compliance shall be based on a three-year running mean.
After June 2033, the Interim Discharge Limits will not be applicable, and the Santa Maria WWTP will be required to meet the new discharge limits as summarized in Table 1.3.
Table 1.3 Summary of New Discharge Limits (Order No. R3-2020-0020) Effective June 2033(1) Constituent 30-day Average 7-day Average Sample Maximum BOD₅, mg/L 30 45 Not Applicable
TSS, mg/L 30 45 Not Applicable
Settleable Solids, mL/L 0.1 0.3 0.5
pH between 6.5 to 8.4 Not Applicable Not Applicable
25-month Rolling Median(2)
TDS, mg/L 1,000
Chloride, mg/L 165
Sodium, mg/L 230
Sulfate, mg/L 500
Boron, mg/L 0.5
TN, mg/L 10
Notes:
TN - total nitrogen
(1) Per the City’s TSCP submitted to the RWQCB in June 2024. (2) Based on the Upper Guadalupe Groundwater Basin. Rolling Median is the median from all data collected over the most recent 25 months.
Volume 3 provided a detailed description of the existing facilities and evaluated the performance and capacity of the existing facilities. Based on the performance and capacity evaluation, it was concluded in Volume 3 that Santa Maria WWTP is at design capacity and is not able to comply with the interim discharge limits. Since the new discharge limits (Order No. R3-2020-0020) are more stringent than the interim discharge limits, it was concluded that the existing process will not be able to achieve the new discharge limits either. Therefore, the goal of this chapter is to screen, identify, and evaluate the various VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
liquid treatment process technologies that will meet the new discharge requirements. The contents of this chapter include:
Identification and screening of potential technologies. Development and evaluation of the selected technologies. Summary of sizing criteria for selected technologies.
1.2 Screening of Technologies
1.2.1 Identification of Potential Technologies
During a workshop, Carollo Engineers presented a comprehensive “universe” of liquid stream nutrient removal technologies that could be considered to address the new discharge limits. The universe of nitrogen removal technologies presented was classified into three main categories:
Activated Sludge Biological Nutrient Removal (BNR).
Activated Sludge Intensification:
» Established.
» Emerging.
Post-Secondary Removal.
Within each of these three main categories, several nutrient removal technologies were identified and considered for screening. Pass/Fail screening criteria were developed for selection of feasible technologies and are summarized in Section 1.2.2.
1.2.2 Screening Criteria for Technologies
As mentioned, screening criteria were developed and utilized for screening the “universe” of nitrogen removal technologies, and are presented in Table 1.4. The screening criteria establish the minimum criteria that all selected technologies must meet in order to be considered feasible and, therefore, be selected for further evaluation. The selected technologies from screening will be used to develop alternatives.
Table 1.4 Screening Criteria
Criteria Description Metric
Ability to meet regulations Complies with near-term water, air, and land-related regulations, and can be adapted to meet anticipated regulations
Pass/Fail
Technology maturity and
risk
Proposed technology/approach has at least one installation with a capacity of 10 mgd or more, with at least 1 year of successful operation (within the last 10 years) at 90 percent
Pass/Fail
Site constraints Structures, equipment, etc., fit within the existing WWTP boundaries
Pass/Fail
Costs Relative Capital and O&M Costs based on experience from existing facilities
Pass/Fail
Chemical usage Doesn’t require more than one chemical truck delivery per week Pass/Fail Notes:
O&M - operations and maintenance
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
1.2.3 Screening Results
Screening results were developed during a workshop conducted with City staff and are presented in Table 1.5. Detailed screening results are presented in Appendix A. The following are the main conclusions based on the screening:
None of the emerging technologies were selected due to the limited number of installations across the country and insufficient O&M experience.
Membrane bioreactor (MBR) technology was considered in two separate configurations, both with and without primary clarifiers; one with the Modified Ludzack-Ettinger (MLE) configuration of the aeration basins, and the second with a Bardenpho configuration. In both cases, either with or without primary clarifiers, these alternatives were all ruled out due to having the highest power consumption, no future plans for reuse that would require having full flow membrane filtration, and high capital cost. The City also noted that, for future removal of salinity, the preferred TDS reduction location would be for drinking water instead of treated wastewater, which would be cheaper and provide a benefit to the customers via a lower TDS drinking water. Furthermore, the City does not have space limitations, which might prompt more serious consideration of an MBR approach. The existing secondary treatment facilities are not able to provide sufficient treatment to meet new discharge requirements (Order No. R3-2020-0020), and, therefore, post-secondary removal technologies were eliminated as they would require expansion of the existing trickling filter process. Of the activated sludge biological nutrient removal (BNR) technologies, 5-Stage Bardenpho and Step Feed were not selected. Five-Stage Bardenpho is similar to the 4-Stage Bardenpho process but also provides phosphorus removal. It is anticipated that the City will not have a phosphorus limit in the future, and, therefore, 5-Stage Bardenpho was not selected. Step Feed was not selected, as well, since it is not able to provide TN < 10 mg/L reliably.
In summary, a total of three technologies passed the screening process and were carried forward for further development of alternatives:
MLE.
Oxidation Ditch.
4-Stage Bardenpho.
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Table 1.5 Summary of Selected Technologies
Category Technology Technology
Status Result Basis for Selection or Non-Selection for Further Evaluation Activated Sludge BNR
MLE Established Selected MLE provides lowest level of TN removal (8-10 mg/L) Oxidation Ditch Established Selected Oxidation ditches are easiest to operate and achieve TN < 8.0 mg/L without chemical addition
4-Stage Bardenpho Established Selected 4-Stage Bardenpho provides highest level of nitrogen removal and can meet TN < 8.0 mg/L with a small amount of chemical addition 5-Stage Bardenpho Established Not Selected 5-Stage Bardenpho provides highest level of nitrogen and phosphorus, however, phosphorus removal is not required
Step Feed Established Not Selected Would not reliably achieve nitrogen removal Simultaneous Nitrification/Denitrification Emerging Not Selected Complex operation and more difficult to control than other processes Can be implemented as part of an operation with any of the alternatives Susceptible to poor settleability
Activated Sludge Intensification
MBR Established Not Selected MBR was eliminated after preliminary evaluation due to highest power consumption, high capital costs, and no future need for membrane quality effluent for full flow; also, no site space limitations IFAS Established Not Selected Not broadly applied across the industry BAS Established Not Selected Significant mechanical equipment and supply of external ballast; high risk of equipment failure
Limited installation; high maintenance
AGS
MABR
High-Rate A-Stage/B-Stage (A/B)
Mainstream Deammonification
Nitrate Shunt
Anaerobic MBR
Emerging Not Selected None of the emerging intensification technologies were selected due to:
Insufficient full-scale operating experience
Limited installations
Not feasible as a first step toward nitrogen removal
Can be implemented in the future
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Category Technology Technology
Status Result Basis for Selection or Non-Selection for Further Evaluation Post Secondary Removal
NTF Established Not Selected Does not nitrify as reliably and consistently as other technologies Denitrification Filters Established Not Selected Most common technology; can be an alternative to BAF for denitrification
BAF Established Not Selected Smallest footprint; can be implemented for both nitrification/denitrification
MBBR Established Not Selected Slightly large footprint and less industry experience in the United States than BAF; can be an alternate to BAF for nitrification
Notes:
AGS - anaerobic granular sludge; BAF - biologically aerated filters; BAS - ballasted activated sludge; IFAS - integrated fixed film activated sludge; MABR - membrane aerated biofilm reactor; MBBR - moving bed biofilm reactor; NTF - nitrifying trickling filters VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
1.3 Liquid Treatment Alternatives Analysis
This section summarizes the development (Section 1.3.1) and further evaluation of the alternatives. The evaluation included development of sizing criteria, layouts, capital costs, and O&M costs for each of the selected alternatives. Section 1.3.2 presented the influent conditions used for developing the sizing of the alternatives, and Section 1.3.3 provides a description of the selected alternatives.
The remainder of the evaluation, including the development of layouts and costs, is described in Chapters 2 and 3 of this volume.
1.3.1 Development of Alternatives
Each selected technology was considered with and without primary clarifiers for the development of the alternatives.
MLE - with and without primary clarifiers.
Oxidation Ditch - with and without primary clarifiers. 4-Stage Bardenpho - with and without primary clarifiers.
Process models were developed for each of the technologies for configurations with and without primary clarifiers. Appendix B describes the process model development and shows the six different configurations modeled.
During the screening workshop, a key performance target was developed for all alternatives. For an alternative to be considered for further evaluation, it needs to meet an effluent TN target of 8 mg/L. The process configurations with primary clarifiers require less reactor volume and better support the implementation of anaerobic digesters and energy recovery. However, the process configurations with primary clarifiers also result in carbon limitations for denitrification, and therefore, supplemental carbon is needed to meet nutrient performance objectives.
Although each of the alternatives with primary clarifiers might require some supplemental carbon to meet a TN target of 8 mg/L, the MLE alternative with primary clarifiers could not achieve the effluent TN target even with addition of a significant amount of supplemental carbon. Therefore, MLE with primary clarifiers was not evaluated further. The five alternatives that were evaluated further are as follows:
Alternative 1: MLE with extended aeration and without primary clarifiers. Alternative 2: Oxidation Ditch with primary clarifiers. Alternative 3: Oxidation Ditch without primary clarifiers. Alternative 4: 4-Stage Bardenpho with primary clarifiers. Alternative 5: 4-Stage Bardenpho without primary clarifiers.
It is important to note that tertiary filtration was originally planned as a sidestream treatment process to help the City meet interim effluent quality objectives prior to completion of the Phase 1 improvements.
Although the interim need has since been eliminated, at the time of this liquid treatment process evaluation, tertiary filters were assumed to be included in the project for this reason. Because the filters will still be relatively new during the startup of Phase 1 improvements, the tertiary filtration facilities are assumed to remain in service for the useful life of the equipment and are therefore included in the preliminary project costs presented in Chapter 3 of this volume. Continued operation of the filters could VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
provide incremental improvements in effluent quality for the percolation ponds, even if only a portion of the plant flow is treated. However, because tertiary filtration is not required to meet the long-term regulatory requirements following completion of the Phase 1 improvements, it is not included in the liquid treatment process modeling or comparative alternatives analysis presented herein.
1.3.2 Influent Conditions
Flow and loading projections were developed as part of Volume 2. Projections were developed for annual average and maximum month loadings. These projections are available in more detail in Section 5.6 of Volume 2.
There are several driving factors for the sizing of each nitrogen removal process. Typically, agencies need to meet monthly limits for nutrients, so sizing is based on maximum, or peak month loading conditions.
Since the City’s future limits are based on the 25-month rolling median for TN, it was decided that sizing criteria based on annual average conditions will provide a sufficient safety factor for nitrogen removal. The selected technologies will achieve biochemical oxygen demand (BOD) and TSS well below the future limits. Although there will be periods when the flow, BOD, and TSS loads will be higher than annual average conditions, these periods will be a short enough duration and will not affect the ability to meet the 25-month rolling median for nutrients or the monthly or weekly limits for BOD and TSS. To confirm this, performance was verified with the process model for maximum month loadings conditions, and target solids retention time (SRT) during those conditions is listed in Table 1.6.
Table 1.6 Influent Conditions
Parameter 2060 Annual Average 2060 Maximum Month
BOD Loading, lb/day 41,252 48,678
CBOD Loading, lb/day 35,064 41,376
TSS Loading, lb/day 33,960 42,676
TKN Loading, lb/day 6,282 7,653
NH3-N Loading, lb/day 4,386 5,344
Alkalinity, mg/L as CaCO₃ 355 355
Temperature, degrees C 18 18
Notes:
CaCO₃ - calcium carbonate; C - Celsius; lb - pounds; NH3-N - ammonia-nitrogen; TKN - total Kjeldahl nitrogen
1.3.3 Description of Alternatives
1.3.3.1 Alternative 1: Modified Ludzack-Ettinger with Extended Aeration and Without Primary Clarifiers
This alternative requires construction of new facilities including a headworks, aeration tanks, secondary clarifiers, blowers, mixed liquor recirculation (MLR) pumps, return activated sludge (RAS) and waste activated sludge (WAS) pump stations, and tertiary filters for the liquid treatment process. With this alternative, there is a possibility of repurposing existing secondary clarifiers, solids handling treatment facilities, and percolation ponds.
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
Figure 1.1 shows a process flow schematic for this alternative downstream of screening and grit removal.
For this alternative, the aeration tanks will be configured with an MLE process. This process is the most common configuration implemented across the industry for nitrogen removal. The aeration tanks include a separate anoxic zone followed by aerobic zones. Nitrification occurs in the aerobic zones and denitrification occurs in the anoxic zone. MLR pumps bring nitrate from the aerobic zone back to the anoxic zone where denitrification occurs. Since influent is directly introduced to the anoxic zone, most of the carbon demand for denitrification is fulfilled with the incoming wastewater. However, the Santa Maria WWTP receives high concentrations of TKN and NH3-N, and, therefore, supplemental carbon may still be needed. The aeration tanks will be equipped with fine bubble diffusers, and pressurized air will be supplied through blowers.
Figure 1.1 MLE Extended Aeration Process Flow Schematic
1.3.3.2 Alternative 2: Oxidation Ditch With Primary Clarifiers This alternative includes headworks, primary clarifiers, oxidation ditches with a mechanical aerator, secondary clarifiers, RAS and WAS pump stations, and tertiary filters for the liquid treatment process. With this alternative, there is a possibility of repurposing existing primary clarifiers, secondary clarifiers, solids handling treatment facilities, and percolation ponds. Figure 1.2 shows a process flow schematic for this alternative.
An oxidation ditch is another modification of the activated sludge biological treatment process that utilizes long SRTs rather than a typical MLE or Bardenpho process to remove biodegradable organics.
A typical oxidation ditch treatment system consists of a single or multi-channel configuration within a ring, oval, or horseshoe-shaped basin with horizontally or vertically mounted mechanical aerators that provide circulation and oxygen transfer. For this alternative, the aeration tanks will be configured as a “racetrack type.” Like the MLE alternative, the reactors include a separate anoxic zone followed by the oxidation ditch. Nitrification occurs in the aerobic zones, and denitrification occurs in the anoxic zone.
Since influent is directly introduced to the anoxic zone, most of the carbon demand for denitrification is fulfilled with the incoming wastewater. Additionally, oxidation ditches can be operated to achieve partial denitrification. Therefore, supplemental carbon might not be needed for this alternative. The oxidation ditches will be equipped with mechanical aerators.
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Figure 1.2 Oxidation Ditch Process Flow Schematic With Primary Clarifiers
1.3.3.3 Alternative 3: Oxidation Ditch Without Primary Clarifiers This alternative is the same as Alternative 2 but without primary clarifiers. Figure 1.3 shows a process flow schematic for this alternative.
Figure 1.3 Oxidation Ditch Process Flow Schematic Without Primary Clarifiers
1.3.3.4 Alternative 4: 4-Stage Bardenpho With Primary Clarifiers This alternative includes headworks, primary clarifiers, aeration tanks, secondary clarifiers, blowers, RAS and WAS pump stations, and tertiary filters for the liquid treatment process. With this alternative there is a possibility of repurposing existing primary clarifiers, secondary clarifiers, solids handling treatment facilities, and percolation ponds.
For this alternative, the aeration tanks will be configured as the 4-Stage Bardenpho process, as shown in Figure 1.4. This process is essentially the same as the MLE process, but it also includes a second anoxic zone (post-anoxic) and a small aerobic zone (post-aerobic or re-aeration). The post-anoxic and aerobic zones allow for improved nutrient removal performance compared to the MLE process. The post-anoxic zone allows for denitrification of the remaining nitrate not removed in the first anoxic zone and is capable of achieving what’s considered the limit of technology for biological nitrogen removal (i.e., TN less than 3 mg/L). The re-aeration zone (post-aerobic) ensures that the mixed liquor remains aerobic for better settling in secondary clarifiers. Supplemental carbon will be needed in the post-anoxic zone to optimize performance. While achieving the limit of technology is not required for the City, this process VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
configuration provides the City increased operational flexibility and the ability to adapt to future regulations.
Figure 1.4 4-Stage Bardenpho Process Flow Schematic With Primary Clarifiers
1.3.3.5 Alternative 5: 4-Stage Bardenpho Without Primary Clarifiers This alternative is the same as Alternative 4 but without primary clarifiers, as shown in Figure 1.5.
Figure 1.5 4-Stage Bardenpho Process Flow Schematic Without Primary Clarifiers
1.3.4 Alternatives Sizing Criteria
Table 1.7 summarizes the major elements and key planning level sizing criteria that were developed for each of the alternatives. Appendix B contains detailed planning-level sizing criteria.
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
Table 1.7 Planning Level Sizing Criteria for Selected Liquid Treatment Process Alternatives Parameter
Alternative 1:
MLE With Extended
Aeration Without
Primary Clarifiers
Alternative 2:
Oxidation Ditch With
Primary Clarifiers
Alternative 3:
Oxidation Ditch Without
Primary Clarifiers
Alternative 4:
4-Stage Bardenpho
With Primary Clarifiers
Alternative 5:
4-Stage Bardenpho
Without Primary
Clarifiers
Influent
AAF, mgd 10 10 10 10 10
Peak Hour Flow, mgd 19 19 19 19 19
Primary Clarifiers
Number in Service -- 3 -- 3 --
Area in Service at AAF, sf -- 10,000 --- 10,000 ---
Overflow Rate at AAF, gpd/sf -- 1,000 -- 1,000 --
Overflow Rate at Peak, gpd/sf -- 1,900 -- 1,900 --
Aeration Basin
Number in Service 3 4 5 3 3
Total Volume, MG 13.4 10.1 15.0 6.0 13.0
Anoxic Fraction, % 25% 21% 21% 35% 35%
MLSS, mg/L 3,000 3,000 3,000 3,000 3,000
Total SRT, days
Annual Average 15 15 15 9.5 15
Maximum Month 12 12 12 7.5 12
DO in Aerobic Zone 1, mg/L 2.0 2.0 2.0 2.0 2.0
DO in Aerobic Zone 2, mg/L 1.0 1.0 1.0 1.0 1.0
Air Demand, scfm 21,000 -- -- 16,000 22,000
Power Draw, hp 776 1,074 1,487 586 775
MLR pumping, % 500 -- -- 400 200
Methanol, lb COD/day 450 -- -- 3,380 --
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Parameter
Alternative 1:
MLE With Extended
Aeration Without
Primary Clarifiers
Alternative 2:
Oxidation Ditch With
Primary Clarifiers
Alternative 3:
Oxidation Ditch Without
Primary Clarifiers
Alternative 4:
4-Stage Bardenpho
With Primary Clarifiers
Alternative 5:
4-Stage Bardenpho
Without Primary
Clarifiers
Secondary Clarifiers
Number in Service 3 3 3 3 3
Surface Area, sf 26,000 26,000 26,000 26,000 26,000
Surface Overflow Rate at AAF, gpd/sf 385 385 385 385 385 Surface Overflow Rate at PH, gpd/sf 731 731 731 731 731 SVI, mL/g 150 150 150 150 150
RAS
Flow, % 100 100 100 100 100
Flow, mgd 10 10 10 10 10
WAS
Flow, mgd 0.43 0.23 0.48 0.28 0.44
TSS, mg/L 6,000 6,000 6,000 6,000 6,000
Notes:
COD - chemical oxygen demand; DO - dissolved oxygen; hp - horsepower; MG - million gallons; mL/g - milliliter per gram; MLSS - mixed liquor suspended solids; PH - peak hour; scfm - standard cubic feet per minute; sf - square foot; SVI - sludge volume index VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
1.4 Summary
After an initial screening and evaluation process, six treatment train alternatives were considered further.
One of these, MLE plus primary treatment, was eliminated because process modeling showed that this configuration would not be able to meet the target effluent TN value of 8 mg/L. Achieving a target of 8 mg/L provides a safety factor of 2 mg/L below the permit limit of 10 mg/L.
Each of the six initial treatment configurations was discussed in detail with the City during Workshop No. 2 in May 2024, and the remaining five process configurations were carried forward for development of preliminary process layouts. The five remaining process configurations still under consideration were:
Alternative 1: MLE with extended aeration and without primary clarifiers. Alternative 2: Oxidation Ditch with primary clarifiers. Alternative 3: Oxidation Ditch without primary clarifiers. Alternative 4: 4-Stage Bardenpho with primary clarifiers. Alternative 5: 4-Stage Bardenpho without primary clarifiers.
The development of process layouts for the five process alternatives and selection of the preferred site is discussed in Volume 6, Chapter 3.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
CHAPTER 2 SCREENING AND EVALUATION OF SOLIDS
TREATMENT ALTERNATIVES
2.1 Background and Introduction
Solids treatment is a fundamental component of the overall wastewater treatment process, responsible for transforming the raw sludge produced during primary and secondary treatment into a stable, dewatered biosolids product suitable for final disposal off-site. While solids treatment is often secondary to the liquid treatment process, solids handling can account for a significant portion of a facility's capital and operating costs. Effective solids treatment not only supports regulatory compliance and operational efficiency but also helps minimize environmental impact by reducing the volume and improving the quality of the residual biosolids. Currently, the Santa Maria Wastewater Treatment Plant (WWTP) faces challenges with insufficient capacity in their existing sludge drying beds during wet weather months. This issue is compounded by the limited space on the existing site for expansion of the current sludge drying bed operation. This deficit is not sustainable with the overall treatment goals for the facility and needs to be addressed as a part of the first phase of treatment upgrades.
This chapter presents a comprehensive overview of the solids treatment processes, including thickening, digestion, sludge storage, dewatering, and cake storage. Each step plays a critical role in managing water content, stabilizing organic material, and producing a biosolids product that is both manageable and cost-effective to haul off-site for disposal. Thoughtful selection and design of solids treatment technologies are essential, as they directly influence the characteristics of the final cake, including its moisture content, odors, and vector attraction. With biosolids disposal often representing one of the largest ongoing expenses for wastewater utilities, optimizing solids treatment processes offers substantial opportunity for long-term cost savings. This chapter will evaluate treatment options with a focus on performance, operational reliability, and overall costs to guide informed decision-making for solids handling strategies.
For the Santa Maria WWTP, all five selected liquid treatment alternatives, discussed in detail in Chapter 1, include the following two solid waste streams:
1. Waste Activated Sludge (WAS): This is the excess biomass produced during the secondary treatment process. It is largely composed of microorganisms and biological floc with 0.5 percent to 1 percent total solids (TS) concentration.
2. Secondary Scum: This is the floatable solid waste from the secondary clarifiers including filamentous organisms, foam, and grease.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
In addition to WAS and secondary scum, Alternatives 2 and 4 both include:
1. Primary Sludge: The solid materials that settle out of raw wastewater during primary clarification. This waste stream is largely composed of organic material, fecal solids, and grit at a concentration of 1 percent to 3.5 percent TS.
2. Primary Scum: Primary scum is similar in nature to secondary scum and consists of a floatable solid waste stream that accumulates in the primary clarifiers (PCs), comprised of fats, oils, and grease (FOG) and other buoyant materials poorly suited for settling.
The technologies reviewed as a part of this chapter are shown in Table 2.1. This table lists the five treatment alternatives under consideration and indicates only whether a specific solids handling technology can be considered, in general, for the solids produced by each alternative. As shown, many technologies can be considered; however, not all technologies are compatible or practical in every combination for a complete solids treatment alternative. The combinations of solids treatment trains with these technologies will be reviewed in the subsequent sections of this chapter.
Table 2.1 Solids Treatment Processes Suitable for Use in Evaluated Liquid Treatment Alternatives Treatment
Process
Liquid Treatment
Alternative 1
(MLE Without
PCs)
Liquid Treatment
Alternative 2
(Ox-Ditch With
PCs)
Liquid Treatment
Alternative 3
(Ox-Ditch Without
PCs)
Liquid Treatment
Alternative 4
(Bardenpho With
PCs)
Liquid Treatment
Alternative 5
(Bardenpho
Without PCs)
Gravity
Thickening
DAF Thickening
Rotary Drum
Thickening
Gravity Belt
Thickening
Anaerobic
Digestion
Aerobic Sludge
Digestion
Non-Aerated
Sludge Storage
Aerated Sludge
Storage
Dewatering Screw
Press
BFP
Dewatering
Centrifuge
Sludge Drying
Beds
Notes:
DAF - dissolved air flotation; MLE - Modified Ludzack-Ettinger VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3
2.2 Screening of Technologies
When identifying suitable treatment technologies for solids, the primary consideration is what types of solids will comprise the solids stream. As mentioned in the introduction, each alternative will have both WAS and secondary scum, and, depending on whether or not the selected liquid treatment alternative includes PCs, primary sludge and primary scum may also be present. A review of each solids processing technology is provided in the following sub-sections under each intended use of the technology.
2.2.1 Sludge Thickening
The sludge thickening process is a critical step in solids treatment to help reduce the water content of the sludge, that is, increase the solids concentration, which reduces the required hydraulic capacity of all downstream solids processes. This also allows for more water to return to the liquid treatment process, where it can receive full liquid treatment. Lowering the volume of sludge moving through the solids treatment process not only allows for capital investment savings by reducing hydraulic capacity requirements but also provides the long-term benefit of increasing operational efficiency. Lower overall solids volume will reduce mixing and heating requirements in digesters and sludge storage volume. It also can benefit dewatering equipment, which may be hydraulically limited for the dewatering process.
A variety of technologies are available for thickening different types of sludge. For this evaluation, the following technologies were reviewed for primary and WAS sludge thickening:
Primary sludge thickening only:
» Gravity thickening.
WAS thickening only:
» DAF.
Suitable for both separate thickening of primary sludge and WAS or co-thickening:
» Rotary drum thickening.
» Gravity belt thickening.
These technologies were all considered for use at the Santa Maria WWTP, and each offers unique advantages and disadvantages depending on the characteristics of the sludge. Selecting the appropriate thickening technology is essential for achieving reliable, cost-effective, and sustainable biosolids management with an operating philosophy that meets the needs of City of Santa Maria (City) staff.
2.2.1.1 Gravity Thickening
Gravity thickening has a long-standing history of reliable sludge thickening of settleable solids and, at its core, is a gravity settling tank, similar in design to a PC. Sludge settles to form a thickened sludge blanket in the conical bottom section of the tank, and using a slow-moving rake mechanism, thickened sludge is moved into a hopper, which allows collection of thickened sludge from the tank. Settled sludge is then pumped out of the tank and sent downstream, usually to a sludge digester. The process relies on gravity to drive settling within the tank while the supernatant (water overflow) is discharged from the thickener and sent back to the head of the WWTP. This is the thickening technology currently utilized at the Santa Maria WWTP and provides consistent and efficient sludge thickening. Figure 2.1 provides an overview of a typical gravity thickener.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4
Figure 2.1 Gravity Thickener Diagram
Gravity thickening is most effective for primary sludge because of its relatively high solids concentration with high settleability of its constituents (e.g., grit, large fecal solids, and other dense debris). Typical primary sludge enters the gravity thickener at a concentration of 1 to 3.5 percent TS and can be thickened to 4 to 6 percent TS. It is common for gravity thickeners to operate continuously with their energy-efficient mechanism, making them a reliable and low-maintenance process for primary sludge thickening.
While gravity thickening is a low-energy and relatively simple process with minimal mechanical components, it does have operational challenges. One significant limitation is its inability to handle floatable materials like WAS and scum. Scum and FOG materials rise to the surface, forming thick mats that interfere with supernatant overflow, generate odors, and complicate maintenance and operation.
Similarly, WAS does not settle well due to its generally buoyant biological structure without costly chemical conditioning. For this reason, it is not recommended that WAS and scum be directed to gravity thickeners. Additionally, due to the long hydraulic residence times, uncovered gravity thickeners may produce odors if not properly ventilated or managed, particularly in warmer climates or at facilities with longer sludge storage periods.
Despite these challenges, gravity thickeners remain a viable option for the Santa Maria WWTP for primary sludge thickening, which already has a significant history working with the existing gravity thickeners. If the selected liquid treatment train includes primary clarification, gravity thickeners are recommended for primary sludge thickening. Rehabilitation of Sludge Thickener No. 2 is also recommended, in this case, during Phase 1 construction. However, Sludge Thickener No. 1 is not suitable for long-term use and should be replaced during Phase 1 if primary sludge thickening is required in the selected treatment alternative; see Volume 4 for additional information. They offer low operational costs and reliable VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5
thickening performance when properly designed and maintained. However, when considering thickening of WAS or scum, other thickening technologies will be more appropriate.
2.2.1.2 Dissolved Air Flotation Thickening
DAF thickening is a solids concentration process effective for floating solids, such as WAS and scum.
Unlike gravity thickeners that rely on settleability, a dissolved air flotation thickener (DAFT) operates on the principle of flotation, using microbubbles of air to carry solids upward. In a DAFT, air is dissolved into a pressurized recycle stream of clarified water and then released into the DAFT tank. This pressure drop between the recycle stream and the DAFT tank causes the dissolved air to form microscopic bubbles, which attach to the suspended solids and lift them to the surface, where a thickened sludge blanket is formed and removed by a rotating surface skimmer. Clarified water exits from the bottom of the unit and can be recycled back into the liquid treatment process. Figure 2.2 provides an overview of a DAFT unit.
Figure 2.2 DAFT Diagram
DAF thickening is especially well suited for WAS due to its colloidal and low-density nature, which prevents effective gravity settling. Typical thickening results for WAS can increase solids concentrations from 0.5 to 1 percent up to 3 to 5 percent, depending on the feed characteristics and polymer used. To optimize performance, DAF systems are often designed with conservative performance expectations, and then polymer testing is performed post-startup to determine the best polymer choice for the sludge characteristics.
DAFTs provide consistent performance under variable loading conditions along with 24-hour (hr) operation, offering operational flexibility. In addition to thickening WAS, DAF systems can be designed to accept scum. In these cases, their ability to float solids makes it uniquely capable of handling floatable, greasy materials such as scum and foam with minimal fouling risk. For plants using DAF thickening for WAS, scum can be co-thickened in the same unit. A bypass line can also be installed to send scum directly to digestion when needed.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
Despite its advantages, DAF thickening does have trade-offs. It requires more mechanical equipment and energy input than other thickening systems and includes pressurization systems, air compressors, and chemical feed systems, which require additional operations and maintenance (O&M) effort. Additionally, the need for polymer addition increases operating costs and chemical handling complexity. Still, for facilities handling large amounts of WAS, especially with a need to thicken scum, DAFTs should be considered.
2.2.1.3 Rotary Drum Thickening
RDTs are enclosed mechanical thickening devices designed to separate water from sludge through a rotating, cylindrical drum covered with a fine mesh screen. Sludge is first conditioned with polymer to form flocs in a flocculation tank. Flocculated sludge is fed into the drum and gently conveyed through it by internal flights or panels as the drum rotates. Free water drains through the screen under gravity, while the thickened sludge continues forward and is discharged from the opposite end. Internally, a spray system at the top of the drum keeps the mesh clean to maintain permeability through the drum, and slow rotation prevents excessive turbulence, which helps retain floc structure and thickening performance.
Figure 2.3 shows an RDT with major components identified.
Figure 2.3 RDT
RDTs are typically used for thickening WAS, particularly in smaller to mid-sized plants where footprint and ease of operation are important; however, they can be used to thicken primary sludge as well. With polymer conditioning, RDTs can achieve solids concentrations in the range of 4 percent to 6 percent, depending on sludge characteristics and retention time. Based on past experience, once polymer testing is performed, it is not uncommon for RDTs to achieve 6 percent TS when thickening WAS. They offer the advantage of continuous operation with relatively low energy usage and minimal operator attention, with 24-hr operation possible, making them well-suited to facilities looking for a low-maintenance mechanical thickening solution.
A distinct advantage of RDTs, when compared to both gravity thickeners and DAFTs, is that they can co-thicken primary sludge and WAS, producing a uniform thickened sludge for digestion. This change in VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7
operation would require additional equipment, such as a sludge blending tank to provide consistent feed to the RDTs and additional RDTs to handle the increased combined sludge flow. Though the enclosed design of an RDT helps with odors, additional odor control may be required due to the addition of primary sludge. Despite the additional equipment requirements, co-thickening often produces a higher concentration of solids in the thickened sludge stream, sometimes upwards of 8 percent, which can help recapture existing capacity or minimize capacity requirements for new equipment downstream. When co-thickening, RDTs can be sensitive to fluctuating inlet solids concentrations since polymer dosing is typically flow-paced and controlled independently of solids concentration. Though WAS often provides consistent solids concentrations, primary sludge solids concentrations can vary significantly depending on the sludge banket within the PCs. Careful coordination in the operation of the PCs is required when co-thickening in an RDT.
However, RDTs are not recommended for handling scum. The floatable and sticky nature of scum, especially if it contains high concentrations of FOG, can cause severe fouling of the perforated drum, clogging the mesh and reducing throughput or even leading to equipment failure. Scum can also disrupt the polymer-aided flocculation process within the drum, leading to poor capture rates and inconsistent solids concentration. For this reason, RDTs should be reserved for sludge streams free of problematic floatable solids, and scum should be diverted to alternative processes such as digestion or DAFT systems, if available.
2.2.1.4 Gravity Belt Thickening
Gravity belt thickeners (GBTs) are the final thickening technology reviewed herein and are another form of mechanical thickening equipment, which uses a continuously moving porous belt to separate water from sludge via gravity. Sludge is mixed with polymer and applied to the belt, where it is evenly distributed and slowly moves through a series of gravity drainage zones. Rollers or plows gently mix and redistribute the sludge to enhance drainage, while filtrate drains through the porous belt below and is collected for return to the liquid treatment process. GBTs are known for their consistent performance, good solids capture efficiency, and relatively compact footprint. Figure 2.4 shows a diagram of a GBT and its general operation.
Figure 2.4 GBT Diagram
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
GBTs are commonly used to thicken WAS and sometimes combined sludges, producing a thickened product in the range of 4 percent to 6 percent solids. Similar to other polymer-using thickening processes, a conservative design is selected, and post-start-up, sampling and testing are performed with a variety of polymers to determine the most suitable flocculant for the site-specific sludge. Once a polymer has been selected and the system is optimized. Typical applications of GBTs can often achieve 5 percent TS in their thickened sludge. Their modular design allows them to be scaled to meet different plant sizes and solids loading rates, and they are often integrated with polymer dosing and control systems for automated operation. GBTs are not enclosed, leaving them visually accessible and user-friendly. This facilitates troubleshooting, which is important considering the complexity of the rollers within this system.
Despite these advantages, GBTs have similar limitations to RDTs when it comes to scum handling. The floatable, greasy nature of scum can quickly foul the belt, reduce drainage performance, and result in excessive maintenance and cleaning demands. Greasy scum can also impair polymer effectiveness, leading to poor floc formation and lower capture rates. Even with belt washing systems, the fouling from scum often reduces overall performance, even when operating within normal parameters. Therefore, unless the scum has been thoroughly screened or emulsified into the sludge stream, it is generally advised not to send scum through GBTs. As with RDTs, digestion or DAF systems offer more appropriate alternatives for scum management. Additionally, GBTs can create a significant mess during equipment failure, especially if the failure involves belt destruction. Because of this, GBTs are often operated only when facilities have staff on-site. This allows any potential mess to be addressed quickly before it gets out of hand. This limitation requires batch operation of the GBTs with the need for upstream sludge storage or storage within the primary or secondary processes themselves. This also leads to batch loading of digesters, which has the potential to create upsets in the process, though it is unlikely for only a short period of time between batch loading.
2.2.1.5 Thickening Screening Results
The information on thickening technologies was presented to the City on February 19, 2025, in Workshop No. 5. The City ultimately decided to eliminate GBTs from further consideration. GBTs have similar performance expectations when compared to RDTs, but come with additional risk and O&M requirements when operated continuously, especially without staff on-site for long weekends. GBTs are also more mechanically complex and do not keep odors contained. Since an RDT addresses these concerns while generally providing slightly better performance with reduced O&M, this technology will be considered further and compared with DAFTs for WAS thickening. Because of the familiarity, cost savings, and reliability associated with the existing gravity thickeners, the City has also chosen to advance the selection of gravity thickeners for primary thickening needs. Based on the outcome of the Workshop and a site visit with the City to a facility operating RDTs, the following two thickening alternatives will be considered for further evaluation:
1. Gravity thickeners for primary sludge with DAFTs for WAS and scum thickening.
2. Gravity thickeners for primary sludge with RDTs for WAS thickening and possible redundancy for both primary sludge and WAS thickening. Scum will be sent directly to anaerobic digesters under this thickening alternative.
These alternatives are developed further in Section 2.4 of this chapter.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
2.2.2 Sludge Digestion
Sludge digestion stabilizes organic matter through volatile solids destruction, reduces pathogens, and minimizes odors in sludge prior to final handling or disposal. By breaking down the biodegradable portion of the sludge through microbial activity, digestion significantly decreases the volume of volatile solids and contributes to the production of a more stable and manageable biosolids product that meets all regulatory requirements.
There are two primary digestion approaches in municipal wastewater treatment:
1. Anaerobic digestion.
2. Aerobic digestion.
Each process has unique advantages, limitations, and operational requirements, and its selection is influenced by factors such as plant size, sludge characteristics, and available energy. This section provides an overview of both technologies, including their general operating principles, required support infrastructure, and typical sizing considerations for achieving Class B biosolids.
At the Santa Maria WWTP, anaerobic digestion currently plays the principal role in meeting regulatory standards for biosolids classification, by allowing the facility to produce Class B biosolids under the requirements of the United States Environmental Protection Agency (EPA) Part 503.
2.2.2.1 Anaerobic Digestion
Anaerobic digestion is a biological process in which microorganisms break down organic matter in the absence of oxygen. It is widely used in medium to large wastewater treatment facilities due to its ability to reduce volatile solids while producing biogas, which can be used as an energy source. Anaerobic digestion is capable of processing both primary sludge and WAS. However, it traditionally does not perform well when treating solids streams that are largely composed of WAS. Because of this, anaerobic digestion was only considered for alternatives with primary sludge as a major component of the waste stream.
Anaerobic digesters are typically heated and mixed continuously and operated in mesophilic (around 95 degrees Fahrenheit [F]) or thermophilic (around 131 degrees F) temperature ranges, with mesophilic being more common for municipal applications. In order to achieve Class B biosolids, a 15-day minimum solids retention time (SRT) must be met. In order to meet the required anaerobic digester volume for Phase 1, a total of 1.43 million gallons (MG) of capacity is needed, based on thickening both WAS and primary sludge prior to digestion and sending unthickened scum directly to the digesters. This can be accomplished with the rehabilitation of existing Digester No. 4 and the addition of one new 75-foot (ft) diameter anaerobic digester, which is slightly larger than the existing Digester No. 4. In order to provide redundancy, a second new 75-ft diameter digester would also be provided to allow for minimum SRT even with one of the largest digesters out of service.
Anaerobic digesters also require heating in order to maintain the operating temperature, mixing to provide uniform distribution of the solids and prevent solids settling, and digester gas handling to safely collect and transfer the biogas. These systems often require their own support systems, for example, biogas conditioning systems and backup heating systems.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
The advantages of anaerobic digestion include the potential for energy recovery, relatively low operating costs compared to aerobic digestion, and high volatile solids reduction. However, anaerobic digestion comes with greater complexity in terms of heating, gas handling, and digester maintenance.
2.2.2.2 Aerobic Digestion
Aerobic digestion is a process where microorganisms decompose organic material in the presence of oxygen. It is typically used in smaller treatment plants without PCs or where anaerobic digestion is not feasible due to scale, energy recovery limitations, or operational preferences. Aerobic digestion is simpler to operate with fewer ancillary systems, but it can often be more costly to construct due to the longer retention time required for Class B biosolids, which can greatly increase the amount of tankage required to serve a facility. Aerobic digestion is also significantly more energy-intensive due to the continuous aeration required to maintain oxygen levels for microbial metabolism.
The main benefits of aerobic digestion include simpler operation, no need for heating and gas handling, and generally fewer odor control challenges compared to anaerobic digestion, although odor from aerobic digesters can be problematic depending on the proximity of neighbors. The process does not produce usable biogas and typically results in higher operating costs due to power consumption for blowers and mixing systems. Aerobic digesters are often operated at ambient temperatures, although in colder climates, insulating or enclosing the tanks may be necessary to maintain biological activity.
For Class B biosolids production, aerobic digestion must meet an SRT of 40 days at 68 degrees F as defined by EPA 503 regulations, equaling over 3.81 MG of total required storage capacity at the Santa Maria WWTP, without redundancy, more than double the required digester volume and associated infrastructure compared to anaerobic digestion. This greatly increases the required capital investment into tankage and long-term aeration expenses when compared to anaerobic digestion. Additionally, aeration demand for these digesters would be a large long-term O&M cost to add to the facility. Because of this, aerobic digestion is usually best suited for smaller facilities, especially in the absence of PCs, where the simplified operation is more cost-effective, even with the investment in larger tankage and sludge aeration when compared to the more complex needs of anaerobic digestion systems.
2.2.2.3 Digestion Screening Results
Sludge digestion can be a complex and costly component of solids treatment; however, for a medium-sized facility, like the Santa Maria WWTP, digestion can often present a beneficial overall balance between site space, cost, operational goals, and treatment requirements when Class B or better biosolids are required. A Class B biosolid product opens the door for significant cost savings for biosolids hauling and disposal, especially in the case of the Santa Maria WWTP, where both an adjoining composting facility and the City's landfill can accept Class B biosolids at a current fee far below the general market. Further discussion of biosolids disposal is presented in Volume 8.
Digestion with Primary Sludge
The Santa Maria WWTP already has four existing anaerobic digesters; only one of these digesters is known to be suitable for rehabilitation with the ability to serve the City through the end of the Phase 1 design horizon. Digester No. 1 may also be a candidate for rehabilitation, pending inspection of the digester interior during upcoming maintenance. The external assessment of Digester No. 1 does not show severe deterioration, though leakage through the digester is present. If the interior assessment shows that VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
rehabilitation is a viable approach, Digester No. 1 may be considered for use during Phase 1 either as an anaerobic digester or as a sludge storage tank. For the purpose of this master plan, it is assumed that Digester No. 1 can be rehabilitated for use as a sludge storage tank. This assumption will need to be re-evaluated once further inspection is complete.
The City has requested that a spare digester is provided so that if a single digester is down for maintenance, the spare digester can be brought online as another is taken down. Based on the loading rates for Alternatives 2 and 4, to accommodate this operational requirement and the minimum 15-day SRT for Class B biosolids, three anaerobic digesters will be required. Two will work in tandem to provide the 15-day SRT, with one on standby for redundancy. Rehabilitation of Digester No. 4, and possibly Digester No. 1, provides a cost-savings advantage to anaerobic digestion by providing up to two like-new digesters at a fraction of the new construction cost.
Assuming the same loading rates from Alternatives 2 and 4, aerobic digestion would require more than double the active tankage volume, all of which would be new construction. A new aeration system would also be required, which will significantly impact long-term O&M costs.
Digestion with 100 Percent Waste Activated Sludge
For Alternatives 1, 3, and 5, where there is no primary sludge, anaerobic digestion is not a recommended option due to the 100 percent WAS solids stream to the digesters. In these instances, aerobic digestion is the most appropriate digestion process for volatile solids destruction. Due to the lack of PCs in these alternatives, the biological treatment process would be proportionally larger to provide sufficient treatment to the incoming wastewater. This ultimately produces a higher overall flow rate of WAS to the solids treatment process, which has a lower solids content when compared to combined primary sludge and WAS. This higher hydraulic loading to the aerobic digesters further increases the required digester volume to meet Class B requirements, exacerbating the high cost of construction and ongoing aeration.
Conclusion
As discussed further in Technical Memorandum (TM) 2 (Appendix A of Volume 8), aerobic digestion ultimately becomes the highest cost alternative overall for both capital investment and operating expenses, even when compared to eliminating digestion and paying for the higher disposal cost of sub-Class B biosolids. This information was presented to the City during a Progress Meeting to discuss TM 2 on January 29, 2025. It is because of this significant detraction that the decision was made to eliminate aerobic digestion from further consideration.
2.2.3 Sludge Storage
Sludge storage acts as a buffer between treatment processes upstream of dewatering, providing operational flexibility in sludge handling, dewatering, and disposal. Effective storage allows facilities to manage variations in sludge production, dewatering schedules, and maintenance of dewatering equipment, and maintain consistent feed rates to dewatering systems when in operation.
The design and operation of sludge storage facilities must consider several critical factors, including sludge type (digested or undigested), solids concentration, potential for odor generation, and the need for mixing or aeration. For liquid treatment Alternatives 2 and 4, where anaerobic digested sludge is being VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-12
stored, a typical sludge storage tank with mechanical mixing is appropriate. However, for Alternatives 1, 3, and 5, aerated sludge storage tanks are recommended to minimize odors.
2.2.3.1 Anaerobically Digested Sludge Storage
In facilities where sludge undergoes anaerobic digestion, a small volume of post-digestion storage is typically provided to accommodate dewatering system downtime, maintenance, or variability in hauling schedules. In this scenario, a 3-day storage volume is provided for stabilized sludge, which generally has a solids concentration of 2 to 4 percent after digestion. Because the sludge has already been biologically stabilized, odors are minimal, and the potential for additional biological activity is low.
The main design consideration for digested sludge storage is mixing, which is essential to prevent solids settling and accumulation in the tank. Short-duration storage tanks are usually equipped with mechanical mixers (e.g., propeller mixers) or recirculation pumps to maintain a homogeneous mixture and provide a consistent solids concentration for feeding downstream dewatering equipment. Tanks are typically covered or enclosed to control any residual odors and maintain a clean operating environment. The goal of this type of storage is not to provide further treatment. With adequate mixing and odor control, a 3-day storage tank can support smooth, continuous dewatering operations and provide operational flexibility without reactivating digestion processes. Additionally, sludge storage can provide more detention time, if needed during digester downtime.
For the purpose of this master plan and its cost estimates, Digester No. 1 is assumed to be rehabilitated and placed in service as a sludge storage tank. It will provide more than 3 days of storage for alternatives with anaerobically digested sludge.
2.2.3.2 Waste Activated Sludge Storage
For Alternatives 1, 3, and 5, the WWTP will store unthickened, undigested WAS prior to dewatering, in an aerated sludge storage tank. In this scenario, a 3-day storage tank is used to hold raw WAS - typically with a low solids concentration of 0.5 to 1.0 percent - prior to feeding it directly to dewatering equipment.
Because the sludge has not been stabilized, biological activity continues during storage, which can lead to significant odor production, foaming, and solids degradation if not properly managed.
To address these concerns, aerated storage is used to maintain aerobic conditions in the tank and prevent anaerobic fermentation, which can lead to severe odor issues and reduced dewatering performance.
Fine-bubble diffused aeration or mechanical surface aerators are typically installed to maintain sufficient dissolved oxygen levels, suppress septicity, and reduce the risk of filamentous foaming. In addition to odor control, aeration also helps mix the sludge, reducing settling and providing a more uniform feed to dewatering units. However, aerated storage requires significant energy input and operational attention, especially in warmer climates where microbial activity is more intense.
For the purpose of this master plan and its cost estimates, Digester No. 1 does not have sufficient volume for 3 days of undigested WAS storage, so a new storage tank is required.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-13
2.2.4 Sludge Dewatering
Sludge dewatering is the final liquid-solids separation process used in wastewater treatment before biosolids disposal. Like thickening, dewatering aims to reduce the water content of sludge; however, while thickening increases solids concentrations to 4 to 6 percent, dewatering produces a much drier material, typically in the range of 15 to 70 percent TS depending on the feed sludge characteristics and dewatering process. This significant reduction in volume reduces hauling and disposal costs, which are typically based on either wet weight or volume. Dewatering also improves the handling characteristics of biosolids, creating a cake-like product that is easier to store, convey, and dispose of. Because biosolids disposal is one of the highest operational costs for wastewater treatment facilities, optimizing the dewatering process is essential for financial and operational sustainability.
Several technologies are available for dewatering sludge, each with its own strengths and weaknesses depending on sludge characteristics, operational preferences, and site constraints. This section evaluates four technologies: centrifuges, screw presses, belt filter presses (BFPs), and sludge drying beds. For the Santa Maria WWTP, regardless of the technology selected, 6 weeks of on-site dewatered cake storage is planned to provide redundancy and flexibility when disposal outlets are temporarily unavailable.
2.2.4.1 Sludge Drying Beds
Sludge drying beds are the current dewatering process used at the Santa Maria WWTP and consist of a passive dewatering system that uses solar drying and gravity drainage to reduce water content in sludge.
This process has consistently provided 70 percent TS during dry weather, drastically reducing the volume and weight of dewatered biosolids for disposal. Sludge is applied to concrete containment areas and allowed to dry over time, with liquid draining downward and evaporating from the surface. Routine turning of the cake is required throughout the drying process using a front-end loader. Once dry, the solids are removed with the loader and placed in a dump truck for hauling to the disposal site. Drying beds are simple to operate, require minimal energy, and are cost-effective where land is available and climate conditions are favorable.
Though drying beds provide excellent performance in dry months, the existing WWTP site is constrained by available space. During 2024, additional temporary mechanical dewatering capacity was brought in to meet sludge processing demands during the wet weather season, and the City is planning something similar in the Fall of 2025. To complicate this issue, if the new Phase 1 facility is located on the existing WWTP site, much of the new treatment process will be constructed in the area currently occupied by the existing drying beds. In order to maintain continuous operation of the existing facility during construction of Phase 1, new permanent mechanical dewatering facilities or additional sludge drying bed area will be needed to free up the existing drying bed area.
In order to serve any liquid treatment alternative, not only do the existing drying beds need to be relocated, but also expanded. This is especially true for Alternatives 1, 3, and 5, which will not include digestion. For these alternatives, a 3-month retention period is required within the drying beds to convert undigested sludge into Class B biosolids. As an example, Figure 2.5 shows Alternative 5b, which is a variant of Alternative 5, providing Class B biosolids through the use of drying beds.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-14
Figure 2.5 Alternative 5b - Bardenpho Without Primary Clarification Using Drying Beds The space requirements for this alternative, for Phase 1 only, would eliminate 29 acres of existing percolation ponds on the existing WWTP site. These percolation ponds are necessary and would require replacement with new ponds on the greenfield site east of the existing WWTP. Given the capital cost, site complexity, and operational limits during wet weather, the City has eliminated drying beds from further consideration as a primary means of dewatering and for meeting Class B requirements. However, if the final alternative layout can accommodate two of the existing drying beds, these can be converted into a dewatered cake storage area, providing the 6-week storage requirement of the facility.
2.2.4.2 Centrifuges
Centrifuges are high-speed mechanical dewatering devices that use centrifugal force to separate water from solids. The feed sludge is introduced into a rotating bowl, where the rapid spinning action forces the heavier solids to the outer wall, while the lighter liquid phase forms an inner layer. A scroll conveyor continuously moves the dewatered solids toward the discharge end, while separated liquid (centrate) exits through a different outlet. Polymer is added prior to centrifugation to enhance solids capture and improve cake dryness. Figure 2.6 shows the key elements of a typical centrifuge for dewatering.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-15
Figure 2.6 Dewatering Centrifuge Diagram
Centrifuges are highly effective for a wide range of sludges, including anaerobically digested mixed sludge or undigested WAS. They are capable of achieving 17 to 25 percent TS in the final cake, depending on the feed characteristics and polymer use. They can operate continuously with relatively high throughput in a compact footprint. Typical design characteristics of dewatering centrifuges are shown in Table 2.2.
Table 2.2 Dewatering Centrifuge Preliminary Design Criteria Established
Manufacturers Unit Size and Capacity System Components
Expected
Sludge
Thickness
Polymer Dosing Utility Water
Demand
Alfa Laval
Centrisys
Hydraulic Loading:
132 gpm/unit(1)
Solids Loading:
30,800 lb/day/unit(1)
Rotating bowl
Screw and
drive motor
Feed pipe
Liquid weirs
18-22% solids(2) 10-20 lb active
polymer/
dry ton sludge(1)
180-250 gpm/unit
Notes:
gpm - gallons per minute; lb - pound
(1) Based on manufacturer-provided information.
(2) Based on typical expected performance for anaerobically digested sludge.
A significant disadvantage to centrifuge dewatering is the high energy requirements and more frequent maintenance due to the high-speed rotating components. Centrifuges also generate high decibel noise levels and may require sound attenuation and vibration isolation for indoor installations. Due to their complexity, they require skilled maintenance staff and regular monitoring of wear components, such as bearings and scroll flights. This technology is best suited for facilities with space limitations and high throughput capacity requirements, unlike the Santa Maria WWTP, which can be well-served by other mechanical dewatering technologies. This information was presented to the City on February 19, 2025, in Workshop No. 5, and it was decided to eliminate centrifuges from further consideration for these reasons.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-16
2.2.4.3 Dewatering Screw Presses
Screw presses are enclosed, low-speed mechanical dewatering devices that use a slowly rotating auger enclosed within a cylindrical screen to press water from sludge. As the screw rotates, sludge is gradually compacted against a pressure cone or gate at the discharge end. Water drains through the screen, while the dewatered cake is extruded out. Polymer is used to improve dewatering efficiency and solids capture.
The slow speed and enclosed design minimize noise, odor, and maintenance. Figure 2.7 shows the key elements of a typical screw press for dewatering.
Figure 2.7 Dewatering Screw Press Diagram
Screw presses are capable of producing cakes with 15 to 20 percent TS, depending on feed characteristics and polymer selection. They are especially well-suited for digested sludge, which has a more uniform, stable solids structure, but can also be used for WAS. Their modular and enclosed design makes them attractive for retrofit or expansion projects, and their simple operation allows for automation and remote monitoring. Screw presses can operate continuously; however, batch dewatering operations are more common. Typical design characteristics of dewatering screw presses are shown in Table 2.3.
Table 2.3 Dewatering Screw Press Preliminary Design Criteria Established
Manufacturers
Unit Size and
Capacity System Components
Expected
Sludge
Thickness
Polymer Dosing Utility Water
Demand
Andritz FKC Co. Hydraulic Loading:
84 gpm/unit(1)
Solids Loading:
28,000 lb/day/unit(1)
Flocculation tank
and mixer
Screw and drive
motor
Drain pan
Washdown
system
Perforated
plate/mesh
screen
15-20% solids(2) 25-30 lb active
polymer/ dry ton
sludge(1)
210-400
gpm/unit at
35 psi
Notes:
psi - pounds per square inch
(1) Based on manufacturer-provided information.
(2) Based on typical expected performance for anaerobically digested sludge.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-17
2.2.4.4 Belt Filter Press
BFPs are widely used mechanical dewatering systems that use multiple porous belts to sandwich the sludge and gradually squeeze out water through pressure and shearing action. The process consists of a gravity drainage zone followed by low- and high-pressure zones using rollers. Polymer conditioning is critical for successful dewatering and solids capture. BFPs can dewater anaerobically digested sludge or raw WAS and typically produce 15 to 20 percent TS in the final cake. Figure 2.8 shows the key elements of a typical BFP for dewatering.
Figure 2.8 Belt Filter Press
Typical performance characteristics for BFPs are provided in Table 2.4.
Table 2.4 BFP Preliminary Design Criteria
Established
Manufacturers Unit Size and Capacity System Components
Expected
Sludge
Thickness
Polymer Dosing Utility Water
Demand
Andritz Ashbrook
Corp.
Hydraulic Loading:
251 gpm/unit(1)
Solids Loading:
17,400 lb/day/unit(1)
Polymer injector
Belt filter cloth
Sludge inlet
distribution
assembly
Belt supports,
rollers, and skirts
Discharge
deflection plate
17-20%
solids(2)
10-20 lb active
polymer/ dry ton
sludge(2)
75 gpm/unit
at 116 psi(1)
Notes:
(1) Based on manufacturer-provided information.
(2) Based on typical expected performance for anaerobically digested sludge.
While BFPs are a proven and reliable technology, they have several operational considerations. They require more operator oversight than screw presses and are prone to spills or belt misalignment if not VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-18
properly maintained. Belt failures can cause significant sludge spillage and mess, which is a concern for the City, especially during unattended hours. As a result, BFPs are often operated in batch mode during staffed hours. This requires upstream sludge storage and batch feeding to digesters or downstream handling processes, which can introduce process variability. For this reason, although BFPs remain a viable option, they are less preferred compared to screw presses for the Santa Maria WWTP. The City has some experience operating BFP through operation of the temporary unit brought to the site in 2024 to augment dewatering capacity.
2.2.4.5 Dewatering Screening Results
The City evaluated the four dewatering technologies described above in the context of both anaerobically digested sludge and a 100 percent WAS scenario. While all technologies are viable under certain conditions, the City has eliminated both drying beds and centrifuges for the reasons discussed in their respective sections. Of the two remaining technologies, BFPs and dewatering screw presses, both offer viable options for the Santa Maria WWTP and have been selected for further evaluation in the next section of this chapter.
2.3 Thickening and Dewatering Evaluations
This section refines the equipment screening process with the City's selected alternatives for both thickening and dewatering equipment. The goal is to provide additional information to assist in the development of next steps in the design process for these areas as the City considers the final treatment alternative.
2.3.1 Thickening Process Evaluation
This section evaluates the two selected thickening alternatives identified to determine the most appropriate solution for the Santa Maria WWTP, namely:
1. Gravity thickeners for primary sludge with DAFTs for WAS and scum thickening.
2. Gravity thickeners for primary sludge with RDTs for WAS thickening and possible redundancy for both primary sludge and WAS thickening. Scum will be sent directly to anaerobic digesters under this thickening alternative.
Each technology is assessed across a set of key criteria that reflect both performance and operational priorities. The evaluation criteria include:
Capital investment: initial infrastructure and equipment cost. Site space: number of units and area requirements.
O&M costs: long-term expenses such as energy, polymer use, and maintenance. Operational flexibility: the technology's ability to perform under variable sludge conditions and process demands.
Thickening performance: the ability of each system to increase sludge solids concentration efficiently and consistently.
Ease of use: captures the complexity of daily operation, automation level, and the required level of operator attention.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-19
Reliability: how prone the equipment is to mechanical failure or performance disruptions over time. Continuous operation: Ability to operate on a continuous 24/7 schedule without staff on-site. Scum handling: Ability for the process to accept scum without significant detriment to performance. Co-thickening: Ability for equipment to accept and thicken blended primary and secondary sludge.
Table 2.5 summarizes the projected primary sludge and WAS flows for each of the five liquid treatment alternatives.
Table 2.5 Estimated Primary Sludge and WAS Flows and Loads Summary Flows and Loads
Liquid
Treatment
Alternative 1
Liquid
Treatment
Alternative 2
Liquid
Treatment
Alternative 3
Liquid
Treatment
Alternative 4
Liquid
Treatment
Alternative 5
Primary Sludge Flow (mgd)(1) N/A 0.086 N/A 0.085 N/A
Primary Sludge Solids Concentration
(% TS)(1)(2) N/A 3.65 N/A 3.53 N/A
Primary Sludge Loading (lb/day)(1) N/A 26,160 N/A 24,922 N/A WAS Flow (mgd)(1) 0.54 0.29 0.61 0.35 0.55
WAS Solids Concentration (%TS)(1) 0.6 0.58 0.61 0.6 0.61 WAS Loading (lb/day)(1) 27,136 14,148 30,802 17,732 27,739 Notes:
mgd - million gallons per day; N/A - not applicable
(1) Flow and loads based on maximum month modeling results for all treatment alternatives presented in Chapter 1 of this Volume.
(2) Although design parameters for the PCs are the same for both Alternatives 2 and 4, the recycle streams for the overall system are not the same, leading to some variance in primary sludge solids content.
Based on the information in Table 2.5, preliminary sizing and number of each type of thickening unit can be determined. Table 2.6 summarizes the sizing criteria for the gravity thickeners, which are only applicable to liquid treatment Alternatives 2 and 4, which feature PCs and therefore primary sludge.
Table 2.7 provides sizing information for the WAS thickening alternatives, DAFTs, and RDTs, which is applicable to all five liquid treatment alternatives.
Table 2.6 Primary Sludge Equipment Sizing
Parameter Liquid Treatment
Alternative 2
Liquid Treatment
Alternative 4
Gravity Thickener Loading Rate(1) 24 lb/sf/day
Gravity Thickener Surface Area(2) 962 sf/unit
Maximum Gravity Thickener Loading 22,898 lb/unit/day
Phase 1 Primary Sludge Loading(3) 26,160 lb/day 24,922 lb/day Number of Units Required 2 Duty
1 Standby
Notes:
sf - square foot
(1) Loading rate design criteria based on criteria published in Water Environment Federation (WEF). 2010. Design of Municipal Wastewater Treatment Plants: WEF Manual of Practice No. 8 ASCE Manuals and Reports on Engineering Practice No. 76.
WEF Press.
(2) Measurement based on record drawings from the 1998 Wastewater Treatment Facilities project. (3) Based on modeling results for Alternatives 2 and 4 as presented in Chapter 1 of this Volume.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-20
Table 2.7 WAS Thickening Equipment Sizing
Solids Treatment
Alternative
Liquid Treatment
Alternative 1(1)
Liquid Treatment
Alternative 2
Liquid Treatment
Alternative 3(1)
Liquid Treatment
Alternative 4
Liquid Treatment
Alternative 5(1)
DAFT RDT DAFT RDT DAFT RDT DAFT RDT DAFT RDT
Process Design
Loading Rate
1.0 lb/sf/hr(2)
350
gpm/unit(3)
1.0 lb/sf/hr(2)
350
gpm/unit(3)
1.0 lb/sf/hr(2)
350
gpm/unit(3)
1.0 lb/sf/hr(2)
350
gpm/unit(3)
1.0 lb/sf/hr(2)
350
gpm/unit(3)
WAS Flow (gpm) 377 205 422 246 382
WAS Loading (lb/hr) 1,131 590 1,283 739 1,156
DAFT Surface Area
(sf/DAFT) 962 N/A 962 N/A 962 N/A 962 N/A 962 N/A
# of Required Units(4) 2 duty
1 standby
2 duty
1 standby
1 duty
1 standby
2 duty
1 standby
2 duty
1 standby
2 duty
1 standby
1 duty
1 standby
1 duty
1 standby
2 duty
1 standby
2 duty
1 standby
Estimated Space
Required(5) 7,300 sf 2,600 sf 4,900 sf 2,600 sf 9,800 sf 2,600 sf 7,300 sf 2,600 sf 7,300 sf 2,600 sf Notes:
hr - hour
(1) For Alternatives 1, 3, and 5, WAS thickening prior to sludge storage and dewatering is only recommended if a reduction in the 3-day aerated sludge storage tank volume is desired. Otherwise, the investment does little to benefit the final biosolids process. (2) DAFT loading rate design criteria based on criteria published in WEF 2010. Design of Municipal Wastewater Treatment Plants: WEF Manual of Practice No. 8, ASCE Manuals and Reports on Engineering Practice No. 76. WEF Press. (3) The thickeners for this application have a nominal hydraulic capacity of 400 gpm, but based on operational experience at other facilities, performance is optimized when the flow is limited to 350 gpm. WAS flow and loads were based on modeling results for all treatment alternatives defined in Chapter 1 of this Volume. (4) Number of required DAFTs assumes a 35-ft diameter circular DAFT for surface area calculations. For Alternatives 3 and 4, keeping this assumption necessitates more DAFTs that would likely be constructed. In practicality, the DAFTs for these alternatives would be made slightly larger in order to reduce the total number of DAFTs to be constructed. For the purposes of this evaluation, the size of the DAFTs is kept the same across all alternatives to provide a clearer comparison. Similarly, the FKC RTD400 RDT was used for the purpose of equipment requirements across all alternatives. For Alternatives 2 and 4, smaller RDTs may be available that more closely match the hydraulic loading requirements for these alternatives, potentially reducing the overall required footprint. (5) Footprint required assumes that the rotary drum thickening process area will be constructed during Phase 1 to accommodate the additional RDTs required for Phase 2 construction. The DAFTs assume only the area required for Phase 1 construction, as the additional tankage will not be built until needed.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-21
Table 2.8 summarizes each technology's strengths and limitations across these categories to support a recommendation that balances cost, performance, reliability, and operational goals for the two thickening combinations under consideration. In both cases, primary solids would be thickened using gravity thickeners, so much of the comparison in Table 2.8 is focused on thickening of WAS.
Table 2.8 Sludge Thickening Alternatives Summary
Criteria Gravity Thickeners for Primary Sludge
With DAFTs for WAS and scum
Gravity Thickeners for Primary Sludge With RDTs for WAS (scum directly to digesters)
Capital
Investment
Higher capital investment due to significant
reinforced concrete construction, greater
number of support systems, and
specialized construction
Lower capital investment due to a smaller compact unit with fewer support system components for the contractor to
coordinate
Site Space Larger footprint required due to multiple
35-ft diameter elevated tanks with large
external components, like the recirculation
equipment
The RDT 400 units used for comparison are nearly 1/3 of the size of a single DAFT unit, allowing for significant space savings, even when considering a building large enough to install Phase 2 equipment
O&M Costs Higher O&M costs due to multiple external
components, notably the polymer,
compressors, and recirculation systems
associated with DAFTs
Lower O&M cost due to relatively minimal external support equipment and energy-efficient RDT motors. Polymer
consumption is generally higher, which will be the primary annual cost.
Operational
Flexibility
DAFTs are more forgiving when it comes
to changing sludge characteristics and
have the distinct advantage of being able
to handle scum as well as WAS. However,
they are not suitable for co-thickening and
cannot provide cross-redundancy to the
gravity thickeners
RDTs can provide co-thickening of both WAS and primary
sludge, with improved thickening performance. This would require additional units to handle the added hydraulic and solids load to the RDTs, but does provide additional
redundancy to the gravity thickeners, if sufficient capacity is installed. Scum would be handled in the digesters.
Thickening scum in an RDT is not recommended, although it is possible with an expected reduction in thickening
performance and additional cleaning with steam or hot water Thickening
Performance
When thickening 100% WAS, DAFTs
routinely provide 4% TS or greater
thickened WAS
When thickening 100% WAS, RDTs routinely provide 6% TS
or greater thickened WAS
Ease of Use Both technologies present similar ease of
use for operators although DAFTs may be
more challenging when it comes to
replacing the DAFT mechanism
RDTs offer similar ease of use, however, a thoughtful
approach to equipment access by cranes or other large
lifting machinery is necessary, as the RDTs are often
located inside a building or under a canopy structure
Reliability DAFTs are highly reliable, but do have
more overall moving components within
the system, which contributes to slightly
more maintenance requirements
RDTs are highly reliable and offer similar expected
performance to DAFTs when it comes to lifetime of the
mechanical equipment
Continuous
Operation
DAFTs are typically operated continuously
in order to maintain solids capture
efficiency and minimize wear on the
system components
RDTs can be operated continuously, or in a batch operation if a means to store un-thickened sludge upstream is
provided.
Overall
Ranking
0/+ +
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-22
Based on the evaluation of RDTs and DAFTs, both technologies offer reliable thickening performance for waste-activated sludge and have been successfully implemented in facilities of similar size and complexity.
However, RDTs offer a slight advantage in this case due to their lower energy usage, enclosed design for improved odor control, and reduced operator attention during continuous operation. Additionally, RDTs generally require less mechanical complexity compared to DAFT systems, particularly regarding the need for air pressurization systems. While DAFTs remain a strong and proven option, particularly for facilities with significant scum volumes or variable sludge characteristics, the relative simplicity and operational efficiency of RDTs provide a favorable balance of performance and O&M requirements for the Santa Maria WWTP. Ultimately, both technologies are viable for WAS thickening. The City visited a local WWTP that operates RDTs in co-thickening mode on a blend of primary solids and WAS, and thought favorably about the technology and approach. As an option for co-thickening ahead of RDTs for Santa Maria, one or both of the existing gravity thickeners could be converted to a sludge holding/blending tank. This refinement and the final decision regarding the process configuration can be confirmed during the preliminary design phase with further operational input from City staff.
2.3.2 Dewatering Process Evaluation
This section evaluates the two selected dewatering alternatives identified by the City to determine the most appropriate solution for the Santa Maria WWTP, namely:
1. BFPs.
2. Screw Presses.
Each technology is assessed across a set of key criteria that reflect both performance and operational priorities. The evaluation criteria include:
Capital investment: initial infrastructure and equipment cost. Site space: Number of units and area requirements.
O&M costs: long-term expenses such as energy, polymer use, and maintenance. Dewatering performance: the ability of each system to increase sludge solids concentration efficiently and consistently.
Ease of use: captures the complexity of daily operation, automation level, and the required level of operator attention.
Reliability: how prone the equipment is to mechanical failure or performance disruptions over time.
Table 2.9 summarizes the projected sludge flows to dewatering for each of the five liquid treatment alternatives, which establishes the required flow and loading to the dewatering equipment.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-23
Table 2.9 Estimated Sludge Flows and Loads to Dewatering Summary Flows and Loads
Liquid
Treatment
Alternative 1
Liquid
Treatment
Alternative 2
Liquid
Treatment
Alternative 3
Liquid
Treatment
Alternative 4
Liquid
Treatment
Alternative 5
Thickened Primary Sludge Flow
(mgd) N/A 0.05 N/A 0.05 N/A
Thickened WAS Flow (mgd) N/A 0.03 N/A 0.04 N/A
Total Thickened Sludge Flow
(mgd) N/A 0.08 N/A 0.09 N/A
Digested Sludge Flow to
Dewatering (gpm)(1) N/A 211 N/A 223 N/A
Digested Sludge Solids
Concentration (% TS)(1) N/A 2.9 N/A 2.8 N/A
Digested Sludge Loading to
Dewatering (lb/day)(1) N/A 21,431 N/A 21,896 N/A
WAS Flow to Dewatering (gpm)(2) 1,294 N/A 1,446 N/A 1,308 WAS Solids Concentration
(% TS)(2) 0.6 N/A 0.61 N/A 0.61
WAS Loading to Dewatering
(lb/day)(2) 27,136 N/A 30,802 N/A 27,739
Notes:
(1) For Alternatives 2 and 4, the digested sludge loads are based on model results (thickened primary sludge and thickened WAS) and a dewatering schedule of 7 hours per day, 5 days per week. (2) For Alternatives 1, 3, and 5, the WAS flows and loads are based on the modeling results and a dewatering schedule of 7 hours per day, 5 days per week.
(3) Although design parameters for the PCs are the same for both Alternatives 2 and 4, the recycle streams for the overall system are not the same, leading to some variance in primary sludge solids content.
Based on the information in Table 2.9, preliminary sizing and number of each type of dewatering unit were determined. Table 2.10 summarizes the sizing criteria for the BFP and dewatering screw press, which are suitable for all five liquid treatment alternatives.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-24
Table 2.10 Dewatering Equipment Sizing
Solids Treatment
Alternative
Liquid Treatment
Alternative 1
Liquid Treatment
Alternative 2
Liquid Treatment
Alternative 3
Liquid Treatment
Alternative 4
Liquid Treatment
Alternative 5
BFP Screw Press BFP Screw Press BFP Screw Press BFP Screw Press BFP Screw Press Design Hydraulic
Loading Rate(1)(2)
22 gpm/ft of
belt width 175 gpm/unit 15 gpm/ft of belt width 84 gpm/unit 22 gpm/ft of belt width 175 gpm/unit 15 gpm/ft of belt width 84 gpm/unit 22 gpm/ft of belt width 175 gpm/unit Design Solids
Loading Rate(1)(2)
100 lb/ft of
belt width/hr 916 dry lb/hr 200 lb/ft of belt width/hr
1,170 dry
lb/hr
100 lb/ft of
belt width/hr 916 dry lb/hr 200 lb/ft of belt width/hr
1,170 dry
lb/hr
100 lb/ft of
belt width/hr 916 dry lb/hr
Influent Sludge
Flow (gpm) 1,294 211 1,446 223 1,308
Influent Sludge
Loading (lb/hr) 3,877 3,062 4,400 3,128 3,963
Belt Width 7.2 ft N/A 7.2 ft N/A 7.2 ft N/A 7.2 ft N/A 7.2 ft N/A # of Required
Units(3)
9 duty
1 standby
8 duty
1 standby
3 duty
1 standby
3 duty
1 standby
10 duty
1 standby
9 duty
1 standby
3 duty
1 standby
3 duty
1 standby
9 duty
1 standby
8 duty
1 standby
Estimated Motor
Size (hp/unit)(4) 6 9.5 6 9.5 6 9.5 6 9.5 6 9.5
Estimated Space
Required (sf)(5) 14,000 14,000 8,000 8,000 16,000 16,000 8,000 8,000 16,000 14,000 Notes:
(1) Hydraulic and solids design criteria for BFPs is based on criteria published in WEF. 2010. Design of Municipal Wastewater Treatment Plants: WEF Manual of Practice No. 8, ASCE Manuals and Reports on Engineering Practice No. 76. WEF Press. (2) Hydraulic and solids loading design criteria for screw presses are based on FKC screw press performance data provided by the manufacturer. (3) The number of required units is based on dewatering 7 hours per day, and 7 days per week for all alternatives. For the WAS-only alternatives, the number of duty units is high. This could be reduced if the dewatering schedule is changed to either 16 or 22 hours per day for 5 days per week. (4) Total estimate horsepower (hp) for BFP units is based on two 3-hp drive units per BFP. Total estimated hp for screw press is based on a single 7.5-hp screw press motor and a 2-hp motor for the flocculation tank.
(5) Footprint required assumes that the dewatering process area will be constructed during Phase 1 to accommodate the additional dewatering units required for Phase 2 construction.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-25
Table 2.11 summarizes each technology's strengths and limitations across the noted categories to support a recommendation that balances cost, performance, reliability, and operational goals.
Table 2.11 Sludge Dewatering Alternatives Summary
Criteria Dewatering BFPs Dewatering Screw Presses
Capital
Investment
Slightly lower capital investment. Simple design
and long-standing standard sizes keep the market
competitive
Slightly higher capital cost investment. Significant
amounts of custom stainless steel components in
the equipment
Site Space Similar site space requirements for both technologies. Though BFPs tend to require slightly more space per unit than screw presses
O&M Costs Higher O&M costs, typically due to a greater use of polymer and routine belt and roller adjustments
Lower O&M costs, typically due to higher efficiency
and mostly automated operation, with fewer
routine adjustments required
Operational
Flexibility
Can handle various sludge types, but often
requires more polymer usage, especially for 100%
WAS, which is difficult to dewater
Can handle various sludge types and can perform
better than a BFP, especially for high WAS content
sludge
Thickening
Performance
Both technologies typically produce 15 to 20% TS dewatered cake, with the appropriate selection and dosing of polymer
Ease of Use Fairly simple O&M requirements, however, the complexity of the equipment and open design
leads to additional adjustments and cleaning
activities when compared to screw presses
More simple operation, with fewer moving parts,
made easier by the enclosure and inherent design
that minimizes the potential for sludge spillage and
messes surrounding the equipment
Reliability Both technologies are well-established and provide excellent reliability when dewatering conventional digested sludge at a wastewater facility
Continuous
Operation
Both technologies are often operated in batch modes, favoring operating strategies where staff is present to monitor not only the dewatering equipment, but the dewatered cake conveyance operation as well
Overall
Ranking
+ +
Based on the evaluation of BFPs and screw presses, both technologies are capable of providing effective and reliable dewatering performance for both anaerobically digested primary sludge and WAS, and also 100 percent WAS sludge. These technologies have been widely used in municipal wastewater treatment facilities with a proven track record of performance, with multiple manufacturers offering suitable equipment. Screw presses offer a slight advantage in this case due to their lower energy usage, enclosed design for improved odor control, and reduced O&M requirements. Their ability to operate with minimal oversight also aligns well with Alternatives 1, 3, and 5, where 100 percent WAS loading may require extended dewatering hours in order to minimize the high number of units required to process the larger hydraulic loading. BFPs, on the other hand, remain a proven and cost-effective technology with greater familiarity across the industry, particularly where operational flexibility and lower capital costs are priorities. While screw presses may offer some operational efficiencies, both options are well-suited to the Santa Maria WWTP. The final selection of technology can be made during the preliminary design phase based on the selected treatment train configuration, budget considerations, site constraints, and input from City staff.
VOLUME 6 / CHAPTER 2: SCREENING AND EVALUATION OF SOLIDS TREATMENT ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-26
2.4 Recommendations and Findings
The solids treatment evaluation completed to date has considered the full range of thickening, digestion, storage, and dewatering processes necessary to manage different sludge sources generated at the Santa Maria WWTP. This included an analysis of thickening options for both primary sludge and WAS, with gravity thickening selected for primary sludge and RDTs favored for WAS due to their operational simplicity, co-thickening capabilities, and enclosed design. Scum handling was also addressed, with a recommendation to send scum directly to the anaerobic digesters under alternatives that include digestion. Anaerobic digestion is proposed for Alternatives 2 and 4, with digested sludge stored in mixed tanks before dewatering. For dewatering, both BFPs and screw presses were evaluated, and either is considered viable, with a slight operational advantage noted for screw presses. Across all alternatives, the dewatered cake will be sent either to a truck loading hopper or to an on-site cake storage area for up to 6 weeks, providing operational flexibility during times when off-site disposal facilities are unavailable.
For the five liquid treatment alternatives, Table 2.12 summarizes the solids handling treatment trains that are further considered in the development of site layouts in Chapter 3 of this volume:
Table 2.12 Solids Treatment Train Summary
Process Alternatives 2 and 4
(Primary Sludge + WAS)
Alternatives 1, 3, and 5
(100% WAS only)
Sludge Thickening Primary sludge: Gravity Thickeners
WAS: RDTs WAS: RDTs
Scum Handling Sent directly to anaerobic digesters Sent directly to sludge storage Sludge Digestion Anaerobic digestion N/A
Sludge Storage Mixed, 3-day storage post-digestion Aerated, 3-day storage Dewatering BFP or Screw Press BFP or Screw Press
Cake Management Conveyance with truck loading hopper and 6-week storage area
Conveyance with truck loading hopper and
6-week storage area
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-1
CHAPTER 3 PRELIMINARY LAYOUT CONSIDERATIONS
AND EVALUATION
3.1 Purpose
The purpose of this chapter is to evaluate the siting options for the new wastewater treatment facilities planned as part of the master plan. The goal is to assess the potential sites, examine their respective pros and cons, and make a final recommendation that will provide the greatest benefit to the City of Santa Maria (City) in terms of cost-effectiveness, operational efficiency, and long-term sustainability. The three siting options being considered include (1) construction of new and rehabilitated facilities on the existing wastewater treatment plant (WWTP) site, (2) developing a greenfield site across Black Road in the undeveloped farmland area, and (3) adopting a hybrid approach. Each option presents unique challenges and opportunities, and the decision on which layout to pursue has significant potential to impact construction, maintenance, and overall site operation.
3.2 Background
The existing WWTP is situated on approximately 177 acres of land and includes 14 percolation ponds, which are essential to the current operations and must remain in service until the new Phase 1 treatment facilities are constructed, regardless of the chosen siting option. The City also owns an undeveloped (greenfield) property to the east of the existing WWTP, covering roughly 163 acres. This land is currently used for agricultural purposes, but will be integrated into the future expansion plans, including the construction of 42 acres of new percolation ponds, regardless of the chosen site. Both of these potential sites for the new WWTP are shown in Figure 3.1.
In the context of the planned treatment process upgrades during Phase 1, excluding the new percolation ponds, there are three potential options for siting:
1. Existing Site Expansion: All new facilities and infrastructure will be built within the boundaries of the current WWTP property, and only the new percolation ponds will be constructed on the greenfield site. This prioritizes cost savings by maximizing the use of existing infrastructure and equipment, with a combination of rehabilitation and new process construction for reaching Phase 1 treatment capacity goals.
2. Greenfield Site Development: This alternative involves building all new infrastructure on the greenfield property east of Black Road, including process areas, percolation ponds, and associated facilities. Only the existing maintenance and administration buildings, along with the existing percolation ponds, will remain on the current WWTP site. This approach streamlines construction sequencing and minimizes disruptions to existing plant operations.
3. Hybrid Approach: Under this approach, a combination of new construction on the greenfield site and rehabilitated treatment processes at the existing WWTP site will be implemented. This approach attempts to minimize new construction on the greenfield site while allowing for some of the construction sequencing benefits of minimizing new construction on the existing WWTP site.
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-2
Figure 3.1 Potential Site Locations for New Treatment Facilities For all siting options, use of the greenfield site is required for percolation pond construction to fully accommodate the treatment capacity needs of the Santa Maria WWTP for Phase 1 construction. Because of this, the key to evaluating these locations will be to balance the amount of new construction on the greenfield site such that the maximum short-term benefits during construction are achieved without sacrificing long-term benefits for operations and maintenance (O&M) benefits and future expansion plans.
3.3 Siting Evaluation
Siting the new wastewater treatment facility is a significant decision that involves careful consideration of various factors. The multi-million-dollar investment in Phase 1 will serve the community for the next 25 years and form the foundation for future expansions, so it is crucial to assess both the long-term VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-3
operational efficiency and community impact of each potential location. The chosen site must not only accommodate the physical infrastructure and operational processes but also minimize disruption to the surrounding area, consider environmental concerns, and be responsive to community feedback.
Several critical factors were evaluated, including the cost, constructability, future growth, accessibility, environmental impacts, and negative impacts upon the community. WWTPs often face challenges related to visibility, odor control, and general public relations. The site should ideally be located away from residential or highly populated areas, when possible, to avoid potential complaints. Additionally, considerations such as construction sequencing, the existing infrastructure, and operational efficiency play a significant role in determining the most appropriate site.
In the discussion of each siting option below, the treatment facility layout for Alternative 1 was used as an example. Layouts for all alternatives, on both sites for Phase 1 and Phase 2, are included in Appendix C.
All treatment train alternatives are presented and discussed in Volume 6, Chapter 1.
3.3.1 Existing Wastewater Treatment Plant Site
Expanding the WWTP on the existing site has the primary benefit of leveraging the City's existing infrastructure. The layout of process structures on the existing site is largely dictated by the temporary constraint of keeping the existing treatment systems in operation during construction and the long-term goal of producing the most efficient layout in coordination with the existing structures that will be rehabilitated. The possibility of reusing existing infrastructure was based on the findings of the facilities condition assessment, details of which can be found in Volume 4, Chapter 1.
Figure 3.2 shows the layout for treatment train Alternative 1, and as shown, the shaded areas with an asterisk (*) at the end of the process area label indicate existing process structures that will be rehabilitated and reused for Phase 1. Figure 3.2 shows the completed layout at the end of construction after demolition of any remaining unneeded facilities. The new process areas would ideally be constructed adjacent to either the upstream or downstream process in the treatment train for layout efficiency; for example, the new dewatering building is located near the existing digesters. This provides a more streamlined path through the facility as staff perform daily activities. However, due to the critical need to keep the existing plant online during construction, some facilities must be located farther from adjoining treatment processes to allow continued wastewater treatment/operations during construction; for example, the new aeration basins are located within the current sludge drying bed area so that the existing clarifiers and trickling filters can remain in operation until a transition to the new biological treatment train can be completed. In all treatment alternatives on the existing WWTP site, new facilities often require layout within the area occupied by the existing sludge drying beds to accommodate these sequencing constraints. This, in turn, triggers the need to advance some systems early, like sludge dewatering, to allow for the decommissioning of the existing drying beds to make room for the new processes.
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-4
Figure 3.2 Phase 1 Layout for Alternative 1 at the Existing WWTP VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-5
Due to the need for the existing facility to remain in operation throughout construction, a more complex construction sequence is required to maintain continuous treatment. This added construction difficulty has a negative impact on capital costs for all treatment alternatives, and a 10 percent direct cost was added to the capital cost estimates for all alternatives constructed on the existing site to accommodate this. Costs are discussed in greater detail within Chapter 4 of this Volume. Although construction on the existing WWTP site will come with increased complexity during construction, the opportunity to reuse existing structures provides a net financial benefit to the Phase 1 construction for all treatment alternatives. Additionally, this siting option provides the long-term benefit of having all treatment processes and support facilities on one site, with the exception of the new percolation ponds, which is far more convenient for daily O&M activities.
3.3.2 Greenfield Site
Building a new wastewater treatment facility on the greenfield site provides a fresh opportunity to design the facility with an optimal layout unencumbered by existing structures and other site constraints. It also offers the flexibility to build a facility without the hindrance of working around currently operating treatment processes. The greenfield site ultimately produces the most streamlined layout for daily activities that is also well-organized for future expansions without congestion. Figure 3.3 shows the Alternative 1 layout on the greenfield site, which allows for siting of each treatment process to be sequential along the path of water flow throughout the facility. The greenfield site generally slopes from the northeast to the southwest, and, conveniently, the incoming trunk sewers would need to be routed to the site from the northeast corner. This allows for a layout that takes advantage of the property grade to minimize pumping costs throughout treatment.
The benefits of the greenfield site do come at the cost of additional infrastructure and financial investment, since all treatment facilities on the existing WWTP site would be decommissioned, and any process areas that could serve during Phase 1 would need to be rebuilt on the greenfield site. This adds significant cost due to the need for new facilities that would have been otherwise rehabilitated if the existing site is selected. In addition to the increased capital investment required for construction on the greenfield site, this would relocate the WWTP closer to the community and potentially create new visual or odor impacts in the future.
The City has determined that the existing administration building, maintenance building, and laboratory would remain on the existing WWTP site and be utilized through Phase 1, even for the greenfield siting option, to preserve significant support infrastructure. These areas need rehabilitation to provide long-term service, so rehabilitation efforts in these areas are still required, similar to the existing WWTP siting option.
However, because the vast majority of the WWTP would now be located on the greenfield site, new O&M facilities, though likely smaller, would still be required on the greenfield site to avoid significant traffic across Black Road throughout the day for O&M staff. Overall, the greenfield site requires more new facilities, which will require capital investment and long-term maintenance.
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-6
Figure 3.3 Phase 1 Layout for Alternative 1 on the Greenfield Site VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-7
3.3.3 Hybrid Approach
The hybrid approach combines the existing WWTP site and the greenfield site by preserving some treatment processes at the original site and constructing new facilities on the greenfield site. This alternative attempts to balance the benefits of utilizing the existing infrastructure with the opportunity for new development on the greenfield site, where conflicts with existing infrastructure can be minimized.
The hybrid approach presents its own challenges, as it would involve splitting the operations between two locations, complicating the daily operations and leading to inefficiencies due to increased travel and disjointed workflows. Although detailed design and hydraulics have not been performed, it is likely that additional pumping would also be required for all treatment alternatives to accommodate the hybrid approach. It is clear that the facility would gain the short-term benefit of reducing the amount of construction on the existing site, but would ultimately not allow for streamlined daily O&M activities.
Not only would the hybrid approach create a disjointed workflow for the City's staff, but the same conflict would be created for outside vendors providing on-site services such as chemical delivery, biosolids disposal, and other contracted services. This approach has been eliminated from further consideration due to these challenges and overall negative impact to long-term operations.
3.4 Conclusions
The siting options discussed above were presented to the City in Workshop No. 4 in November 2024. The conclusions presented below are based on the outcome of the discussions during the workshop.
Utilizing the existing site for the Phase 1 expansion offers several long-term advantages, including minimal staff travel across Black Road and the ability to utilize existing structures and equipment. It also has the benefit of leveraging existing processes to minimize capital investment. However, this alternative presents challenges related to construction sequencing, existing underground utilities, and space constraints on the site.
While the greenfield site allows for a streamlined, modern facility design, it introduces significant challenges in terms of increased visibility, the potential for impact to the nearby community, and the need to build additional new supporting infrastructure. Additionally, staff would have to travel across Black Road frequently to access the existing maintenance building, administration building, and laboratory, leading to operational inefficiencies. Ultimately, this option is less favorable due to its logistical challenges and costs despite the opportunity for a more idealized facility design.
The hybrid approach introduces the most complexity and inefficiency. The need for staff to travel back and forth between the sites multiple times per day creates logistical challenges that would disrupt the operational flow. The disjointed nature of this approach could compromise overall operational efficiency and put undue strain on staff. This option is also more complicated than the other two, as it requires coordination between two sites. Ultimately, while it offers some benefits, the inefficiencies and operational challenges make this the least favorable alternative.
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-8
Table 3.1 captures the key considerations for each siting option.
Table 3.1 Summary of Key Considerations for Each Site Location Consideration Existing Site Expansion Greenfield Site Development Hybrid Approach Cost Lower capital costs due to
use of existing infrastructure
Higher capital costs due to
new infrastructure and
demolition
Moderate, due to dual-site
development and demolition
Community Impact
(Visibility)
Lower risk, as the facility
remains on the current site,
further from the city
Higher risk of visibility and
public perception as an
eyesore due to proximity to
the city
Moderate, as part of the facility is
still located on the existing site
Odor Control Easier to manage, as the
existing site is already
operational
Higher risk of odor impacting
the community near the
greenfield site
Moderate, with potential odor
control issues at the greenfield
site
Operational Efficiency High, as all processes are
located on a single site,
minimizing travel
Lower, due to staff travel
across Black Road and
potential logistical issues
Lowest, due to frequent travel
between sites and operational
separation
Construction
Constraints
Challenging due to existing
underground utilities and
space limitations
Easier layout planning,
though higher visibility and
environmental concerns
High complexity due to dual-site
development and construction
sequencing
Long-Term
Flexibility/Expansion
Somewhat limited, but
demolition of old facilities
creates space for future
facilities
High, as the greenfield site
allows for future growth and
new infrastructure
Moderate, as the greenfield site
offers space for expansion, but
with inefficiencies due to dual-site
operations
Staff Travel/Logistics Minimal travel between sites
(only for percolation ponds)
Moderate travel required
between sites for
maintenance, admin, and
processes
Substantial travel between sites,
leading to inefficiency in
operations
Based on the evaluation of the siting alternatives, the existing site expansion was determined to be the most suitable option for the City's long-term needs. While this alternative presents some challenges in construction sequencing and spatial constraints, it minimizes travel between sites, leverages existing infrastructure, and provides a more cohesive arrangement of process equipment. The factors considered important in the decision to use the existing site for the Phase 1 project were:
Through leverage of existing facilities that have remaining useful life, the City can realize some meaningful cost savings by continuing to use the existing site. The existing site has been a treatment plant site since the 1940s and has already had a California Environmental Quality Act (CEQA) environmental review performed in the past for this fully disturbed site. An initial study would be required to determine the extent of CEQA review and mitigation for the project, however with continued use of a fully disturbed site, mitigation measures are expected to be less for this siting alternative compared to new construction on a greenfield site. There is adequate space to lay out the Phase 1 and Phase 2 and potentially future facilities in an orderly manner on the existing site.
Moving the site to the east, even though a small distance, would bring the treatment facility closer to more populated areas. Building on the greenfield site has a greater potential for traffic, noise, odor, and visual impacts to the community when compared to reuse of the existing WWTP site.
VOLUME 6 / CHAPTER 3: PRELIMINARY LAYOUT CONSIDERATIONS AND EVALUATION OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-9
Once the existing sludge drying beds are removed, there is sufficient space for new buildings and structures on the existing site.
Percolation ponds on the greenfield site would be a suitable use of that site, with plans from around 2016 already developed for some percolation ponds on that property. There would be no need to re-route sewer mains across existing farmland.
The City's commitment to overcoming the challenges of the existing site demonstrates their prioritization of long-term operational efficiency and community relations over the short-term difficulties of construction.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-2
CHAPTER 4 CAPITAL AND O&M COST DEVELOPMENT
4.1 Purpose
The purpose of this chapter is to build on the cost-estimating assumptions and methodology established in Volume 2, Chapter 6 of the Master Plan and detail the projected capital investment, O&M costs, and net present worth for each of the treatment alternatives presented in Chapters 1 and 2 of this Volume.
The cost estimates presented in this Chapter, with the exception of the net present values, are as discussed in detail with the City during a workshop in November 2024 (Workshop No. 4).
Feedback obtained from the City following the workshop and other refinements to the cost estimates for the preferred treatment alternative since that time is included in Volume 6, Chapter 5.
4.2 Background
This Master Plan, when completed, presents an updated plan that meets the expansion and replacement needs of the City's wastewater treatment systems until 2060. During the planning period of this Master Plan, two major and separate phases of capital improvements will be constructed. Phase 1 of the improvements will take the facility through 2052 with 10 mgd average dry weather flow (ADWF) of hydraulic capacity at the projected loading rates for this expansion's horizon. Phase 2 construction will be completed by 2050, prior to exceeding Phase 1 treatment capacity, and will provide a total plant capacity of 12 mgd ADWF, to take the City beyond 2060 in terms of the projected flow and loading needs. The costs within this chapter reflect Phase 1 construction only.
Peak flow conditions and constituent loading concentrations are often driving factors in process and equipment selection, sizing, and quantities. As shown in Table 4.1 the current BOD and TSS concentrations at the facility are well above the original design criteria used for the sizing of the existing facilities.
Additionally, the measured values are higher than the typical range expected for domestic wastewater not only for BOD and TSS, but for TKN and ammonia (NH3). As future flows were considered, using the actual concentrations at the Santa Maria WWTP drove the costs for additional treatment capacity higher. This was not only because of the projected increase in flows, but also to provide sufficient treatment capacity based on these higher-than-average constituent concentrations. Volume 2, Chapter 5 presented the anticipated future flows and loads for the treatment plant, and different flow scenarios were presented.
Although the Phase 1 average flow to the facility could be around 10 mgd, the higher concentrations associated with the City's wastewater mean that the BOD and TSS loads are equivalent to those for a significantly larger treatment facility treating "typical" domestic wastewater.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-3
Table 4.1 Current Raw Wastewater Characteristics Compared With Existing Design Criteria Values Constituent Santa Maria WWTP Average
Influent(1)
Existing WWTP Design
Criteria(3) Typical Values(4)
BOD5, mg/L 491(2) 317 133 - 400
TSS, mg/L 396 323 130 - 389
TKN, mg/L 73 -- 35 - 60
NH3, mg/L 49 -- 14 - 41
Notes:
(1) Based on average recorded values from 2018 through 2024, unless otherwise noted. (2) Based on average recorded values from October 2023 through 2024. (3) Based on stated design criteria in the 2008 WWTP Expansion Phase II record drawings. (4) Typical values based on data summarized in Metcalf & Eddy Inc. et al. Wastewater Engineering: Treatment and Resource Recovery. 5th ed., McGraw-Hill Professional, 2013.
This cost analysis focused on five separate treatment alternatives, which are described in detail within Chapters 1 and 2 of this Volume. Costs have been prepared for these treatment alternatives based on the liquids and solids treatment processes shown in Table 4.2. In addition to evaluating the five treatment alternatives, siting of the new treatment facilities was also considered. The City owns sufficient land on the east side of Black Road, across from the existing WWTP, to construct a new facility during Phase 1. Both construction on this property (greenfield) and the existing WWTP site (existing) were considered when preparing capital cost estimates. This resulted in a total of 10 capital cost estimates for the Phase 1 evaluation.
Table 4.2 Alternative Treatment Train Processes Included in the Capital Cost Estimates Treatment
Train
Alternative 1:MLE
Without PCs and
Digester
Alternative 2:
Oxidation Ditch With
PCs and Digester
Alternative 3:
Oxidation Ditch
Without PCs and
Digester
Alternative 4:
Bardenpho With
PCs and Digester
Alternative 5:
Bardenpho Without
PCs and Digester
Liquid
Stream
Screening and
Grit Removal
MLE Process
w/ Carbon
Addition
Secondary
Clarifiers
Tertiary Filters
Screening and
Grit Removal
Primary
Clarifiers
Oxidation Ditch
Secondary
Clarifiers
Tertiary Filters
Screening and Grit
Removal
Oxidation Ditch
Secondary
Clarifiers
Tertiary Filters
Screening and
Grit Removal
Primary
Clarifiers
Bardenpho
Process
Secondary
Clarifiers
BAF
Tertiary Filters
Screening and
Grit Removal
Bardenpho
Process
Secondary
Clarifiers
Tertiary Filters
Solids
Stream
Aerated sludge
storage
Mechanical
dewatering
Sludge
Thickening
Anaerobic
Digestion
Sludge Storage
Mechanical
dewatering
Aerated sludge
storage
Mechanical
dewatering
Sludge
Thickening
Anaerobic
Digestion
Sludge Storage
Mechanical
dewatering
Aerated sludge
storage
Mechanical
dewatering
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-4
4.3 Level of Accuracy
The costs shown herein are estimates and are prepared as guidance for project evaluation and planning purposes using limited information available at the time of the estimate. For this reason, based on AACE International's definitions of the five "class estimates" in AACE International Recommended Practice No. 18R-97, the classification of costs presented in this Master Plan are Class 4 estimates. The expected accuracy of any estimates included herein are defined as Class 4 with the expected costs to be within a range of 50 percent over the estimate to 30 percent under the estimate, as shown in Table 4.3.
Table 4.3 AACE Classification of Cost Estimates
Primary Characteristic Secondary Characteristic
Estimate
Class
Maturity Level of Project
Definition Deliverables End Usage Methodology Expected Accuracy Range Class 5 0% to 2% Concept Screening Capacity factored, parametric models, judgement, or analogy -50% to +100%
Class 4 1% to 15% Study of Feasibility Equipment factored or parametric -30% to +50% Class 3 10% to 40% Budget authorization
or control
Semi-detailed unit costs with
assembly level line items -20% to +30%
Class 2 30% to 75% Control of bid/tender Detailed unit cost with forced detailed take-off -15% to +20%
Class 1 65% to 100% Check estimate or
bid/tender
Detailed unit cost with detailed
take-off -20% to +15%
More accurate and detailed cost estimates should be prepared during the preliminary design phase of each project in which alternative analyses would be conducted to determine the best alternative for the City using the most up-to-date information at that time.
4.4 Capital Costs
Capital costs represent the total value of completing a new project, including design, bidding, and construction. These estimates consist of all the items that will be constructed/purchased for the projects that are being evaluated for the Master Plan during Phase I. The direct cost of each equipment item or process area will be based on gathering reference costs, calculating unit costs in 2024 dollars, then scaling the costs to the appropriate size for the Santa Maria WWTP. An outline of this approach is shown in Figure 4.1.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-5
Figure 4.1 Approach Used for Developing Capital Cost Estimates For major equipment, Carollo pulled information from multiple recent project estimates, bid tabs, and worked with manufacturers of various technologies to develop capital costs. For these estimates, manufacturers typically provide equipment and material costs only. Depending on the scope of their budgetary quote, allowances for ancillary work, such as installation and electrical, instrumentation and control (EI&C), were added to the direct costs. Additionally, some process equipment requires additional infrastructure or equipment beyond the manufacturer's quote, such as buildings or storage facilities, which were also added to the direct costs. An example of the methodology described herein is shown in Figure 4.2 below.
Figure 4.2 Approach Used for Developing Major Equipment Cost Estimates VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-6
For most projects, depending on applicability, general factors will be added to the direct costs derived from the information listed above. These factors are discussed in greater detail in Volume 2 Chapter 6, but are summarized here:
Direct Costs:
» Site Work and Yard Piping - 15 percent.
» EI&C - 20 percent.
Indirect Costs:
» Contingency - 30 percent.
» General Condition - 12.5 percent.
» General Contractor Overhead, Profit, and Risk - 15 percent. » Sales Tax - 8.8 percent.
» Escalation to Midpoint - 3.7 percent.
» Engineering Support (Design and Engineering Services During Construction [ESDC]) - 15 percent. » Engineering Support - Construction Management - 7 percent. » Legal and Administration Fees - 3 percent.
» Regulatory Compliance - 6 percent.
These costs are typically refined further as the design advances and more is known about the necessary scope of work. For planning purposes, these estimated values capture real but undefined costs while providing a uniform comparison across the treatment alternatives.
The estimated construction and total capital costs for all five alternatives, for both construction on the existing site or on the greenfield site, are shown in Tables 4.4 and 4.5, respectively.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-7
Table 4.4 Summary of Capital Costs for Treatment Alternatives on the Existing Site Facilities % Alternative 1 - MLE Without
PCs and Digester
Alternative 2 - Oxidation Ditch With PCs
and Digester
Alternative 3 - Oxidation Ditch Without
PCs and Digester
Alternative 4 - Bardenpho With
PCs and Digester
Alternative 5 - Bardenpho Without
PCs and Digester
Necessary Demolition $2,146,000 $1,429,000 $1,405,000 $1,429,000 $1,294,000 Remaining Demolition $4,509,000 $5,522,386 $6,030,791 $5,523,000 $6,257,188 Site Work and Yard Piping 15% $21,014,000 $21,700,000 $21,500,000 $20,300,000 $21,600,000 Landscaping $189,000 $189,000 $189,000 $189,000 $189,000 O&M Buildings Rehabilitation $1,755,000 $1,755,000 $1,755,000 $1,755,000 $1,755,000 Headworks $4,247,000 $4,247,000 $4,247,000 $4,247,000 $4,247,000 Primary Clarifiers N/A $2,163,000 N/A $2,163,000 N/A
Aeration Basins $26,205,000 N/A N/A $18,144,000 $39,978,000 Oxidation Ditch N/A $31,041,000 $46,100,000 N/A N/A
Blower Building $6,360,000 N/A N/A $4,846,000 $6,360,000 Secondary Clarifiers $8,366,000 $8,366,000 $8,366,000 $8,366,000 $8,366,000 RAS/WAS Pump Station $3,608,000 $3,700,000 $3,700,000 $3,700,000 $3,700,000 Chemical Addition $160,000 N/A N/A $747,000 N/A
Tertiary Filters $8,122,000 $8,122,000 $8,122,000 $8,122,000 $8,122,000 BAF $10,686,000 N/A N/A N/A N/A
Percolation Ponds $21,644,000 $21,644,000 $21,644,000 $21,644,000 $21,644,000 Scum Handling $731,000 $1,462,000 $731,000 $1,462,000 $731,000 Sludge Thickening N/A $10,209,000 N/A $10,209,000 N/A
Digestion N/A $6,732,000 N/A $6,732,000 N/A
Sludge Storage $5,096,000 $1,152,000 $5,096,000 $1,152,000 $5,096,000 Dewatering $17,974,000 $14,664,000 $17,974,000 $14,664,000 $17,974,000 Boiler Facility N/A $2,428,000 N/A $2,428,000 N/A
Gas Handling and Flare N/A $624,000 N/A $624,000 N/A
Electrical Buildings (building only) $1,596,000 $1,596,000 $1,596,000 $1,596,000 $1,596,000 EI&C 20% $23,348,000 $24,001,000 $23,886,000 $22,540,000 $23,934,000 Difficulty of Construction 10% $16,776,000 $17,266,000 $17,225,000 $16,249,000 $17,276,000 Total Direct Cost $184,600,000 $190,000,000 $189,500,000 $178,800,000 $190,100,000 Contingency(1) 30% $55,380,000 $57,000,000 $56,850,000 $53,700,000 $57,030,000 General Conditions(2) 12.5% $29,998,000 $30,875,000 $30,794,000 $29,100,000 $30,892,000 General Contractor Overhead, Profit, and Risk(3) 15% $40,497,000 $41,682,000 $41,572,000 $39,300,000 $41,704,000 Sales Tax(4) 8.8% $10,500,000 $10,807,000 $10,777,813 $10,200,000 $10,812,000 Escalation to Midpoint (2030)(2) 3.7% $80,947,000 $83,315,000 $83,095,000 $78,500,000 $83,358,000 Total Estimated Base Construction Cost $402,000,000 $413,700,000 $412,600,000 $389,600,000 $413,900,000 Design, CM, Admin, and Regulatory Compliance 31% $124,620,000 $128,247,000 $127,906,000 $120,900,000 $128,309,000 Total Estimated Project Cost $527,000,000 $542,000,000 $541,000,000 $511,000,000 $543,000,000 Notes:
CM construction management
(1) Contingency is calculated based on the Total Direct Cost. (2) General Conditions and Escalation to Midpoint are both calculated based on Total Direct Cost + Contingency. (3) General Contractor Overhead, Profit, and Risk is calculated based on Total Direct Cost + Contingency + General Conditions. (4) Sales taxes are based on 50% of the Total Direct Cost.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-8
Table 4.5 Summary of Capital Costs for Treatment Alternatives on the Greenfield Site Facilities % Alternative 1 - MLE Without
PCs and Digester
Alternative 2 - Oxidation Ditch With
PCs and Digester
Alternative 3 - Oxidation Ditch
Without PCs and Digester
Alternative 4 - Bardenpho With
PCs and Digester
Alternative 5 - Bardenpho Without
PCs and Digester
Necessary Demolition N/A N/A N/A N/A N/A
Remaining Demolition $5,320,000 $5,320,000 $5,320,000 $5,320,000 $5,320,000 Site Work and Yard Piping 15% $24,787,000 $28,497,000 $25,271,000 $27,182,000 $25,314,000 Fencing and Landscaping $1,189,000 $1,189,000 $1,189,000 $1,189,000 $1,189,000 Existing O&M Building Rehab $878,000 $878,000 $878,000 $878,000 $878,000 Headworks $7,331,000 $7,331,000 $7,331,000 $7,331,000 $7,331,000 Primary Clarifiers N/A $10,812,000 N/A $10,812,000 N/A
Aeration Basins $26,205,000 N/A N/A $18,144,000 $39,978,000 Oxidation Ditch N/A $31,041,000 $46,100,000 N/A N/A
Blower Building $6,360,000 N/A N/A $4,846,000 $6,360,000 Secondary Clarifiers $13,942,000 $13,942,000 $13,942,000 $13,942,000 $13,942,000 RAS/WAS Pump Station $3,608,000 $3,608,000 $3,608,000 $3,608,000 $3,608,000 Chemical Addition $160,000 N/A N/A $747,000 N/A
Tertiary Filters $8,122,000 $8,122,000 $8,122,000 $8,122,000 $8,122,000 BAF $10,686,000 N/A N/A N/A N/A
Percolation Ponds $21,644,000 $21,644,000 $21,644,000 $21,644,000 $21,644,000 Scum Handling $731,000 $1,462,000 $731,000 $1,462,000 $731,000 Sludge Thickening N/A $10,209,000 N/A $10,209,000 N/A
Digestion N/A $11,220,000 N/A $11,220,000 N/A
Sludge Storage $7,280,000 $2,879,000 $7,280,000 $2,879,000 $7,280,000 Dewatering $17,974,000 $14,664,000 $17,974,000 $14,664,000 $17,974,000 Boiler Facility N/A $6,069,000 N/A $6,069,000 N/A
Gas Handling & Flare N/A $600,000 N/A $600,000 N/A
Electrical Buildings (Building Only) $3,191,000 $3,191,000 $3,191,000 $3,191,000 $3,191,000 Maintenance and Operations Buildings $7,430,000 $7,430,000 $7,430,000 $7,430,000 $7,430,000 Incoming Sewer Modifications $973,000 $973,000 $973,000 $973,000 $973,000 EI&C 20% $27,541,000 $31,663,000 $28,079,000 $30,202,000 $28,127,000 Total Direct Cost $195,400,000 $223,800,000 $199,100,000 $213,800,000 $199,400,000 Contingency(1) 30% $58,620,000 $67,140,000 $59,730,000 $64,140,000 $59,820,000 General Conditions(2) 12.5% $31,752,500 $36,367,500 $32,353,750 $34,742,500 $32,402,500 General Contractor Overhead, Profit, and Risk(3) 15% $42,865,875 $49,096,125 $43,677,563 $46,902,375 $43,743,375 Sales Tax(4) 8.75% $11,113,375 $12,728,625 $11,323,813 $12,159,875 $11,340,875 Escalation to Midpoint (2030)(2) 3.7% $85,681,890 $98,135,143 $87,304,321 $93,750,195 $87,435,869 Total Estimated Base Construction Cost $425,500,000 $487,300,000 $433,500,000 $465,500,000 $434,200,000 Design, CM, Admin, and Regulatory Compliance 31% $131,905,000 $151,063,000 $134,385,000 $144,305,000 $134,602,000 Total Estimated Project Cost $558,000,000 $639,000,000 $568,000,000 $610,000,000 $569,000,000 Notes:
(1) Contingency is calculated based on the Total Direct Cost. Note that numbers are rounded. (2) General Conditions and Escalation to Midpoint are both calculated based on Total Direct Cost + Contingency. (3) General Contractor Overhead, Profit, and Risk is calculated based on Total Direct Cost + Contingency + General Conditions. (4) Sales taxes are based on 50% of the Total Direct Cost + Contingency.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-9
4.5 Operations and Maintenance Costs
O&M costs were estimated as a simple annual operating cost in order to compare alternatives. These costs include the supplies, utility costs for operations, preventive and corrective maintenance, inspections, and repair and replacement of parts. O&M costs are based on the information provided by the following sources:
Historical costs from recent Carollo Engineers (Carollo) projects. Vendor-supplied motor sizing.
Costs supplied by City staff (i.e., solids disposal, power and propane gas). Calculations as necessary to supplement other sources.
The cost estimates are generally based on applying the above information to plant schematic layouts, estimated pumping elevation head, and major equipment components developed for the Master Plan.
These costs were broken down by the following categories, and the assumed unit costs for these categories are summarized in Table 4.6:
Equipment energy (electricity).
Heating demand (Propane).
Chemical consumption (carbon and polymer).
Maintenance (labor and parts).
Biosolids hauling and disposal.
Table 4.6 Summary of Unit Costs Used to Calculate O&M Costs Unit Cost
Power $0.25/kWh
Carbon $19.63/gallon
Polymer $2.95/lb
Propane $3.50/gallon
Equipment Costs 25% of total direct cost
Maintenance Costs 2% of equipment cost
Biosolids Disposal $32/WT(1)
$73.45/WT(2)
Notes:
kWh - kilowatt hour; WT - wet ton
(1) This cost is used for alternatives producing Class B biosolids. Cost based on weighted total of hauling and disposal costs per WT to Engel & Grey ($33.91/WT) and the City's Landfill ($26.63/WT). Approximately 70 percent of the biosolids are assumed to be disposed of at Engel & Grey with the remaining 30 percent sent to the City's landfill. (2) This cost is used for alternatives producing sub-Class B biosolids. Cost is based on the estimated combined hauling and disposal fee for Synagro’s nearest facilities that accept sub-Class B biosolids (SKIC and Liberty composting facilities).
Electricity usages for most items were based on estimated pumping requirements and manufacturer's motor size data. Propane usages were estimated using historical use data, scaled up to reflect the Phase I treatment capacity of 10 mgd. For alternatives with anaerobic digestion, it was assumed that a majority of heating requirements would be fulfilled by use of the digester gas (DG), with occasional need for use of VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-10
the propane boiler to allow for DG boiler maintenance and repair. Propane use was also assumed to be required for the pilot light of the digester gas flaring operation as well.
Though operational differences exist for each alternative when comparing construction on the existing site versus construction on the greenfield site, these differences are minimal at this planning level in comparison to the differences between different treatment alternatives. Because of this, for each alternative, an annual operation and maintenance cost was prepared regardless of facility siting. A summary of the annual operating costs are shown in Table 4.7. Further details of the annual operating costs for each alternative can be found in Appendix D.
Table 4.7 Summary of Annual O&M Cost for Each Treatment Alternative Element Alternative 1 Alternative 2 Alternative 3 Alternative 4 Alternative 5 Total Annual Operating Cost (1 year) $5.8 million $4.6 million $6.5 million $4.7 million $5.3 million Power $2,310,000 $2,701,000 $3,131,000 $2,185,000 $2,207,000 Propane $0 $5,300 $0 $5,300 $0
Chemicals $576,800 $402,000 $251,000 $1,160,000 $227,000 Maintenance $976,000 $1,112,000 $996,000 $889,000 $951,000 Biosolids Disposal $1,897,000(2) $398,000(1) $2,080,000(2) $430,000(1) $1,882,000(2) Notes:
(1) Cost assumes current biosolids disposal at Engel & Gray (70 percent) and the City Landfill (30 percent). (2) Cost assumes sub-Class B biosolids, which eliminates E&G and the City's landfill as disposal sites. For these costs, hauling and disposal at one of Synagro's nearest facilities is assumed which is significantly higher in cost than current disposal operations at E&G and the City's landfill.
4.6 Present Value Life-Cycle Cost
In order to further evaluate the financial viability of each alternative under both siting conditions, the net present value (NPV) was used as a financial metric to assess the total value of each alternative by accounting for the time value of money. For all five treatment alternatives and for both siting options, a total of ten NPVs were calculated for comparison. Each alternative includes both capital costs and annual O&M costs.
The evaluation spans a 30-year period to match the anticipated duration of a loan that the City might be able to secure for the project. Interest on the loan amount was applied at 5 percent, inflation on annual O&M costs was applied at 3.7 percent, and a discount rate of 1.3 percent was applied to determine the present value of the future costs. Details of how the various rates were determined is included in Volume 2, Chapter 6.
Upon evaluating all five alternatives, Alternative 4 (Bardenpho Activated Sludge with primary treatment) on the existing WWTP site results in the lowest net present worth among the options. Alternative 4 on the existing WWTP site has the lowest capital cost while maintaining one of the lowest O&M costs. It should be noted that the O&M cost for Alternative 4 includes a conservative estimate for the addition of an additional carbon source to assist with full denitrification - see Table 4.7. It is possible that in practice the actual chemical dose would be less than estimated, or not needed at all, which would make Alternative 4 even more financially attractive. Overall, Alternative 4 is the most financially advantageous choice, offering the best balance of initial investment and ongoing operational expenses. Figure 4.3 shows the annual O&M costs for each of the five alternatives, along with the capital cost and net present value for all alternatives and siting options. This visual comparison highlights the most cost-effective solution in terms of both short-term investment and long-term operational costs.
VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-11
Figure 4.3 Comparison of Capital, O&M, and 30-Year NPV for All Alternatives for Two Siting Options VOLUME 6 / CHAPTER 4: CAPITAL AND O&M COST DEVELOPMENT
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-12
4.7 Conclusions
An analysis of the capital cost estimate for five treatment train alternatives and their associated annual O&M costs were performed considering both the existing WWTP site and a new greenfield site. The analysis determined the following:
1. The project cost, which includes the capital and engineering cost estimates, ranges between $511 million and $543 million for expansion of the WWTP at the existing treatment plant site. The equivalent project cost for the greenfield site ranges between $558 million and $639 million. The alternative with the lowest total project cost was Alternative 4 ($511 million).
2. O&M cost estimates range between $4.6 million for Alternative 2 and $6.8 million for Alternative 3.
3. When considering the 30-year NPV the lowest cost alternative is Alternative 4 at the existing site ($1,020,000).
4. Based on this analysis, the most financially advantageous choice for the Phase 1 project, which offers the best balance of initial investment and ongoing operational expenses, is Alternative 4 (Primary treatment followed by a Bardenpho Activated Sludge process and anaerobic digestion for solids treatment) located on the existing WWTP site.
5. The addition of carbon is included in both the capital and O&M costs for Alternative 4 for planning purposes. Ultimately, carbon addition may not be required to meet nitrogen removal requirements, which will be determined during startup testing of the Bardenpho process. If carbon is not required, this will save approximately $3 million in estimated construction costs and $300,000 in annual chemical costs, making Alternative 4 even more attractive as the preferred alternative.
Updated costs and site layouts for the selected project alternative are presented in Chapter 5 of this volume based on modifications made after completion of the analysis presented herein.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-1
CHAPTER 5 TREATMENT ALTERNATIVE SELECTION
5.1 Purpose
This chapter presents the final selected alternative for the Santa Maria WWTP upgrades. The alternative was selected by the City following a comprehensive evaluation of treatment technologies, site configurations, costs, and resource recovery opportunities; see Volume 6, Chapters 1 through 4 for additional details, along with site visits to existing facilities featuring the treatment technologies under consideration.
Based on this multi-criteria assessment and input from City staff, Alternative 4 was selected as the preferred treatment strategy. This alternative features a Bardenpho treatment process with upstream primary clarifiers and downstream secondary clarifiers. Treated effluent will be discharged to percolation ponds as is the current practice. The supporting solids treatment process will include primary and WAS thickening, anaerobic digestion to a Class B biosolid, and mechanical dewatering with 6 weeks of dewatered cake storage.
This chapter summarizes the selection rationale and describes the final treatment train in greater detail, while referencing prior chapters to provide context and continuity.
5.2 Selection of Final WWTP Upgrades
In addition to the volumes of this Master Plan, the decision for the final treatment upgrades was supported by meetings to review alternatives and findings, site visits to multiple wastewater facilities operating processes under consideration, and coordination between the City's stakeholders. This section summarizes the liquids and solids treatment processes selected for the Phase I treatment plant upgrade for the Santa Maria WWTP and key considerations leading to this decision.
5.2.1 Liquid Treatment Processes
The following list summarizes the liquid treatment train selection and key considerations that have helped determine this selection.
1. Septage Receiving:
a. Construction: Rehabilitation and upgrading.
b. Benefits:
i. The City provides the only local septage receiving station to its customers and residents. ii. Leverages existing infrastructure to reduce capital expenditure. iii. Tipping fees are expected to offset a portion of the additional cost of operating an upgraded facility.
c. Treatment Impacts:
i. Septage can have high concentrations of varied constituents when compared to residential wastewater. The irregular loading may add complexity to treatment requirements.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-2
2. Screenings Removal/Headworks:
a. Construction: Rehabilitation.
b. Benefits:
i. This process serves to protect and maintain performance of downstream processes by removing larger inorganic materials from wastewater.
ii. Existing headworks mechanical equipment is beyond its useful life; however, the structure is suitable for continued use through Phase 1. Rehabilitation provides significant cost savings by removing the need for complex concrete work typically required in headworks structures. iii. Rehabilitation of the existing facility will ease some construction difficulty by minimizing site space required in a highly congested area of the WWTP.
c. Considerations:
i. Creates a need for screenings handling and disposal, for which the City already has a standard operating procedure in place.
ii. Screenings generate odors and can hold considerable water, which can increase hauling costs, but this can be mitigated with washing and compacting equipment, if desired. iii. Some organics are removed in the screening process, but the impact is minimal compared to the benefit of debris removal. Organics can be washed out of the screenings and returned to the influent stream.
3. Grit Removal:
a. Construction: New.
b. Benefits:
i. It removes quickly settling debris, which will often build up in downstream basins and become difficult to remove, reducing overall treatment performance and increasing labor during basin cleaning. Grit is also detrimental to pumps, valve seats, and piping due to its coarse and hard nature, and reduces their lifespan through abrasion. ii. A new facility will ease some construction sequencing constraints compared to rehabilitation of the existing aerated grit removal system.
iii. A new facility provides flexibility during design to incorporate improvements in controls, bypassing, and operating conditions.
c. Considerations:
i. Creates a need for grit handling and disposal, for which the City already has a standard operating procedure in place.
4. Primary Clarification:
a. Construction: Rehabilitation.
b. Benefits:
i. Significantly reduces both TSS and BOD concentrations, allowing for a smaller secondary treatment process downstream, thus reducing aeration demand, which is often the highest expense in wastewater treatment.
ii. Existing primary clarifiers provide an opportunity to maximize use of existing infrastructure through rehabilitation.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-3
c. Considerations:
i. Produces primary sludge, requiring a means to treat the sludge to achieve Class B biosolids in order to maintain current biosolids disposal operations. ii. Removes carbon from the downstream treatment process, possibly requiring some carbon addition in the Bardenpho process to achieve TN removal target of <8.0 mg/L. iii. The existing primary clarifiers are large and handle high recycle flows from the existing process. For the Phase I project, the primary influent flow will be a lot smaller, leading to potential odor issues. Mitigation options are available but need to be confirmed during preliminary design.
5. 4-Stage Bardenpho:
a. Construction: New.
b. Benefits:
i. Provides a high level of BOD, TSS, and nitrogen removal. ii. Has the ability to operate with multiple anoxic zones, providing nitrogen removal, which is improved through the addition of external carbon, if and as needed, especially in the future, if the facility needs to comply with more stringent nitrogen limits. iii. Due to its 4-stage design, it has more flexibility for DO control and process optimization when compared to oxidation ditches and MLE configured activated sludge systems. iv. Lower capital and operating costs when compared to alternatives featuring MLE with extended aeration or oxidation ditches.
c. Considerations:
i. Due to primary clarifiers, the process is slightly carbon-deficient, which will be corrected through carbon addition at the Bardenpho process, as needed. ii. This can be impacted by upstream treatment and consistency of wastewater quality, potentially requiring a more hands-on approach to operation at times. iii. A means to remove scum from the process should be considered in case of foaming.
6. Secondary Clarification:
a. Construction: New.
b. Benefits:
i. Settles out biomass from the Bardenpho process and allows for return of activated sludge to facilitate the biological treatment.
ii. Allows removal of excess activated sludge for treatment in the solids treatment process. iii. The existing secondary clarifiers are in need of replacement, and new construction during Phase 1 allows the secondary clarifiers to be relocated, streamlining the overall site layout for long-term O&M benefit.
c. Considerations:
i. Care required to prevent algal growth in the clarifier. If this is a considerable issue, covers can be installed on the clarifiers' weirs to block sunlight. ii. Short-circuiting can occur and increase TSS in the effluent. Density current baffles can help prevent short-circuiting and improve settling.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-4
7. Tertiary Filters:
a. Construction: New.
b. Benefits:
i. Tertiary filtration can be utilized for an in-plant utility water system. This has two major benefits, the first being it removes a portion of the flow from the effluent flow to the percolation ponds, reducing the overall loading on the ponds. The second benefit is that the utility water system provides for multiple water needs on site, which would otherwise come from potable water at an additional cost to the City.
ii. Use of the existing intermediate clarifier as a disinfection and storage tank for treated utility water would be a benefit.
iii. Tertiary treatment will reduce the solids load to the percolation ponds, which rely on active surface area to maintain percolation rates. Removal of solids remaining in the secondary effluent is expected to reduce the long-term costs of maintaining the percolation ponds. c. Considerations:
i. Utility water would require the addition of disinfection, adding another chemical on-site with additional safety, delivery, and cost considerations.
ii. Utility water could be an early deliverable for Phase 1 to provide wash water for the new dewatering facility. Accordingly, the filters would need to be located in an area that will not hamper the Phase 1 construction efforts.
The tertiary filtration concept evolved significantly throughout the planning process as project priorities, regulatory requirements, and operational needs became better defined. Initially, tertiary cloth filters were proposed as an interim treatment measure to improve effluent quality and help the City meet anticipated interim permit requirements until the Phase 1 liquid treatment improvements were completed. Following pilot testing and subsequent discussions with the Regional Water Board, the interim effluent quality objectives were revised such that the interim need for tertiary filtration was eliminated.
The planning effort then shifted to evaluating tertiary filtration to support both utility water and as a permanent treatment process for all secondary effluent to improve water quality delivered to the percolation ponds, reduce biological fouling, and extend pond rehabilitation intervals. While this concept offered operational benefits, there was no need for it to meet regulatory compliance because the upgraded secondary treatment facilities are expected to do so without tertiary treatment.
The current project approach is therefore to implement tertiary filtration only as needed to supply disinfected utility water for plant operations, while preserving a practical path for future expansion. The proposed facility should be planned with sufficient space and infrastructure to allow tertiary filtration capacity to be expanded in the future should operational objectives, regulatory requirements, future reuse needs, or percolation pond performance justify treatment of a larger portion of the plant flow.
1. Percolation Ponds:
a. Construction: Rehabilitated and New.
b. Benefits:
i. Maintains the current treated effluent practice.
ii. Passive system with low routine maintenance.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-5
iii. Familiar to City staff.
iv. A recycled water study (Volume 7, Chapter 1) did not show any benefit to implementing a local recycled water program to irrigate agricultural areas. c. Considerations:
i. Buildup of biological film and solids on the bottom of percolation ponds diminishes percolation performance.
ii. The City has identified an approach and is embarking on a long-term plan to provide regular "cleaning" of the bottom layers of the ponds to maintain percolation rates. Tertiary filtration will help to reduce the frequency of this maintenance process. iii. Additional pond capacity will be constructed to allow time for older ponds to be taken off-line for maintenance.
5.2.2 Solids Treatment Processes
The following list summarizes the solids treatment train selection and key considerations that have helped determine this selection.
1. Gravity Thickening:
a. Construction: Rehabilitation.
b. Benefits:
i. The existing gravity thickeners perform well and one of them has sufficient remaining life in its structure to merit rehabilitation to like-new condition, saving significant capital investment. ii. Simple and low-energy operation, leading to low O&M costs. iii. Operates continuously and provides consistent thickened primary sludge feed to digesters. c. Considerations:
i. Not suitable for scum, WAS, or other floatable solids. ii. Requires a larger footprint on site when compared to rotary drum thickeners and gravity belt thickeners. Due to the size and condition of the existing two gravity thickeners, a total of one rehabilitated gravity thickener and two new gravity thickeners would be required to serve through Phase 1.
iii. Can potentially be converted to sludge blending tanks to blend primary and secondary sludge prior to feeding the rotary drum thickeners. This would need to be confirmed during preliminary design.
2. RDT:
a. Construction: New.
b. Benefits:
i. Can thicken both primary sludge and WAS, allowing for the possibility of using spare RDT equipment to provide additional redundancy to the gravity thickeners. ii. Commonly operated continuously, even when staff are not onsite for monitoring. An equipment failure does not present much risk for a mess in the thickening facility due to the enclosed design, especially when compared to a gravity belt thickener. iii. Requires significantly less site space and power than a DAFT system.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-6
iv. With sufficient equipment installed, it can also provide a pathway to co-thickening in the future.
v. Can consistently provide better water removal than DAFTs and gravity belt thickeners. c. Considerations:
i. Not recommended for scum handling due to the scum often blinding the perforated drum, which is difficult to clean compared to WAS or primary sludge thickening without scum.
Because neither the gravity thickeners nor RDTs are suitable for scum, primary and secondary scum will be sent directly to the digesters.
ii. Rotary drum thickeners often have higher polymer consumption than DAFTs and gravity belt thickeners.
iii. Polymer is often flow-paced, and RDT performance can be sensitive to fluctuations in incoming solids concentrations.
3. Anaerobic Digestion:
a. Construction: Rehabilitated and New.
b. Benefits:
i. Provides the most practical approach to Class B biosolids production when considering cost, site space requirements, and O&M.
ii. Further reduces biosolids, lowering disposal costs when compared to alternatives that do not include anaerobic digestion.
iii. Allows for continued use of current disposal options (Engel & Grey Composting and the City's landfill), which are significantly more cost-effective than other disposal options. iv. Leverages at least one, possibly two, of the largest existing digesters for rehabilitation, at a significant cost savings in digester construction.
v. Digester gas may have beneficial use, not only for hot water boiler operation, but for use in a gas engine to produce heat and power. This will provide beneficial use for a majority of the digester gas, unlike current operation, where most of the gas produced is flared. c. Considerations:
i. Digester gas is produced, requiring means of using or flaring the gas. A digester gas-burning hot water boiler will be included as a support system for the anaerobic digesters, along with a gas conditioning system to remove hydrogen sulfide from the biogas prior to use. A flare will burn excess gas not used by the boiler to meet air quality requirements. ii. Beneficial use of digester gas in other technologies, such as cogeneration engines, will require additional gas scrubbing equipment to remove contaminants, such as siloxanes. iii. Heating is required, which is provided through waste heat from gas engines, the hot water boiler, sludge mixing, and heat exchange systems.
4. Mixed Sludge Storage:
a. Construction: New.
b. Benefits:
i. Provide 3 days of storage for digested sludge, creating a "wide spot" in the solids process to facilitate weekends and downtime for downstream equipment repair. ii. Allows batch processing of solids during daytime work hours of the WWTP. iii. Provides homogenized sludge feed to the dewatering process.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-7
c. Considerations:
i. If only a single sludge storage tank is desired, it is more cost-effective to consider the 3-day storage requirements for Phase 2 construction, to avoid the need for an additional storage tank in the future.
5. Mechanical Dewatering (Belt Filter Press or Screw Press):
a. Construction: New.
b. Benefits:
i. Provides additional treatment capacity when compared to sludge drying beds, with a significantly smaller footprint.
ii. Frees up existing site space occupied by sludge drying beds. This area provides a suitable location for the secondary treatment Bardenpho process and secondary clarifiers. iii. Equipment is not dependent on dry weather for dewatering. iv. Cleaner process with less labor associated with dewatering cake turning or loading when compared to existing sludge drying bed operation.
v. More cost-effective for both capital and operating costs when compared to dewatering centrifuges.
c. Considerations:
i. Screw presses may require slightly more installed duty presses when compared to belt filter presses.
ii. Belt filter presses are mechanically more complex and tend to have more routine O&M requirements.
iii. Dewatered cake from either selected technology will not achieve the same level of dryness as a sludge drying bed, increasing the total weight of biosolids for disposal. iv. The City has identified the need for a 6-week storage area for dewatered cake, during periods of time when biosolids disposal sites are unavailable. This storage area may be used in dry weather months to allow for additional drying of dewatered cake, to reduce the cost of biosolids disposal.
6. Dewatered Cake Storage:
a. Construction: Rehabilitation.
b. Benefits:
i. Allows for storage of dewatered cake during periods of time when biosolids haulers or disposal facilities are unable to accept biosolids from the City. ii. Reuse of two existing sludge drying beds for this storage area allows for a lower-cost retrofit solution near the new mechanical dewatering facility, reducing manual cake handling to accomplish storage goals.
iii. Allows for additional drying, if desired, during dry weather periods to increase water removal from mechanically dewatered cake.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-8
c. Considerations:
i. If covered storage is desired, a canopy could provide protection from wet weather while still allowing air movement across the solids to facilitate evaporation. However, a cover will prevent additional drying through direct sunlight.
ii. To minimize labor, an extended cake conveyor can provide conveyance of solids past the truck loading hopper and into the storage area. Multiple discharge gates can be provided on the conveyor to help distribute solids and reduce the required spreading effort in the storage area.
7. Cogeneration Engine:
a. Construction: New.
b. Benefits:
i. Digester gas produced during anaerobic digestion can be burned within a cogeneration internal combustion engine to produce electricity for the facility and heat for the digesters. ii. Although this adds a new process to the facility, it utilizes far more of the digester gas produced than the existing boiler, leading to less flaring and increased overall beneficial use of the gas.
iii. A detailed evaluation of beneficial biogas use options (Volume 9) showed that the gas engine alternative provides the most benefits and is the preferred approach. Together with the City's planned solar power project, the gas engine alternative would meet all power demands for the Phase 1 treatment facilities.
iv. Adds additional resiliency to the power supply for the plant, joining the existing Pacific Gas & Electric service connection as well as the future solar array. c. Considerations:
i. Digester gas often contains levels of hydrogen sulfide and siloxanes, which can damage gas-burning equipment. Treatment of the gas to remove these constituents will be required. ii. Current digester gas composition contains approximately 60 percent methane. Typical combined heat and power (CHP) engines require methane content between 55 percent and 65 percent for reliable ignition and operation.
iii. New digester gas flares will be provided, which are capable of burning all biogas should that be required.
iv. There are tax credits, grants, and/or other funding sources and incentive programs that improve the payback of these systems. Because of the timeframe for implementation, current financial programs have not been considered since they are likely to change before design of this system. Accordingly, costs included in Volume 9 of this master plan do not reflect any financial incentives.
5.3 Selection of Final WWTP Site
Based on review of information presented in Chapter 3 of this volume and Workshops 4, 5, and 6, expansion/modification of the treatment facilities on the existing Santa Maria WWTP site has been selected to serve the City's needs in the future. Using the existing site does present short-term construction challenges, but provides the overall preferred approach when balancing use of existing infrastructure, cost, spatial constraints, future growth, cohesive facility layout, and ease of operation and VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-9
maintenance. Based on feedback provided by the City, updated layouts for Phase 1 and Phase 2 of Alternative 4 are provided in Figure 5.1 and Figure 5.2, respectively. Major changes incorporated into the layout include:
1. Replacement of both the grit removal system and the secondary clarifiers with new facilities during Phase 1, and not Phase 2 as originally presented.
2. Based on further analysis and the results of tertiary filter pilot testing and the costs to provide and operate a "temporary" filtration system to meet the interim effluent discharge limits, a temporary tertiary treatment system is not required. This determination was made by the Regional Quality Control Board during a meeting held with the City on November 19, 2025. The current approach is to implement tertiary filtration only as needed to supply disinfected utility water for plant operations, while preserving a practical path for future expansion. Accordingly, sufficient space has been allocated to allow the tertiary filtration capacity to be expanded in the future should operational objectives, regulatory requirements, future reuse needs, or percolation pond performance justify treatment of a larger portion of the plant flow.
3. To allow for possible future disinfection of excess tertiary filtered water, over and above that required for plant utility water needs, space has been allocated for future UV disinfection facilities.
4. Due to existing subgrade infrastructure and available conduit in duct banks, the new electrical building has been relocated to the south side of the facility, near the new blower building, where most power load will be drawn.
5. The final layout assumes use of existing Digester No. 1 as a sludge storage tank during Phase 1 once it has been rehabilitated. The final determination on the viability of this alternative will be made once Digester No. 1 is taken offline and inspected during 2027. Space on site has been reserved for a new rectangular sludge storage tank, in the event that Digester No. 1 cannot be rehabilitated, or if Digester No. 1 can be sufficiently rehabilitated to resume operation as an anaerobic digester.
6. A 6-week dewatered cake storage area is now included in the solids treatment process train.
7. A separate septage treatment facility has been included to provide a biological treatment step for ammonia and BOD removal as pretreatment ahead of the activated sludge process. This assumes that the City will continue to accept septage at the WWTP.
8. Road improvements for disposal of dewatered biosolids to both the west, to the Engel & Grey composting facility, and the east via the front entrance to the WWTP, have been included.
9. A contractor staging area has been shown, located to the north of proposed solids cake storage area.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-10
Figure 5.1 Phase 1 WWTP Facilities Layout
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-11
Figure 5.2 Phase 2 WWTP Facilities Layout
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-12
5.4 Updated Project Costs
Throughout the selection process, the City provided feedback on multiple aspects of the work, which impacted both capital and operational costs. These modifications were not included in Volume 6, Chapter 4, as that would not have allowed for an equal comparison amongst the alternatives. Now that the preferred alternative has been selected (Alternative 4), updates to the costs can be made, and the following lists the changes which have been incorporated into the updated project and annual operating cost estimates:
1. Septage handling improvements are now included with 3 (2 duty + 1 standby) Huber RotaShield units included in the cost, along with dedicated biological treatment of septage flows for ammonia and BOD removal as pretreatment ahead of the main Bardenpho treatment process.
2. Secondary clarifiers will be replaced during Phase 1 to remove the existing structures, which are beyond their useful life, and provide a more cohesive site layout.
3. The existing grit removal facility will also be replaced as part of Phase 1.
4. Alternative analysis for mechanical thickening was refined to include only WAS, lowering the total number of mechanical thickeners required for Phase 1 to one duty, one standby.
5. Selection of gravity thickening for primary sludge is now included in the selected alternative, adding two new gravity thickeners and the rehabilitation of the existing Sludge Thickener No. 2.
6. Based on review comments of Technical Memorandum 2, the City gave direction to include new flares in the selected alternative to replace aging equipment. Two new flares are now included in the cost estimate.
7. A 6-week dewatered cake storage area with conveyor has been included in the cost.
8. In Workshop No. 6, the City gave direction that digesters require one standby unit to allow for a redundant digester when one digester is down for repairs. The project will include two duty digesters and one standby.
9. An additional new boiler (two total) is now included, assuming rehabilitation of the existing unit.
10. In Workshop No. 6, the City gave direction to include a new gas engine co-generation facility along with required support systems to maximize beneficial reuse of digester gas.
11. In a weekly progress meeting, the City gave direction that tertiary filtration will be provided to meet the Phase 1 utility water demands of 1 mgd average flow with storage to accommodate peak utility water demand. Two filters will be provided at 1 mgd each in a duty/standby configuration. The filters will be sized so they can be expanded in the future to a total of 2.5 mgd per filter. This will facilitate possible expansion in the future to provide full tertiary treatment, if desired. The supporting infrastructure will be currently configured to accommodate only the two filters required for utility water system needs. Space on site has been allocated to allow for future growth for up to a total of six filters, each 2.5 mgd, allowing for 10 mgd average and 20 mgd peak flow through the filters with space for two standby units. This system includes disinfection, backwashing equipment, utility water pumps, piping, and storage required to support in-plant utility water demands at the WWTP.
12. The percolation ponds and addition of effluent pumps to support the ponds have been removed from the project cost because this work is now part of an early project under a separate construction project from the Phase 1 improvements.
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-13
In addition to these changes, after discussion with the City, modifications have also been made to the factors used to calculate indirect costs, so that they more closely match the City's anticipated distribution of project finances. The final factors used to calculate total project costs are shown below, with the modified factors in bold:
1. Contingency - 30 percent.
2. General Condition - 12.5 percent.
3. General Contractor Overhead, Profit, and Risk - 15 percent.
4. Sales Tax - 8.75 percent.
5. Escalation to Midpoint - 3.7 percent.
6. Engineering Support (Design and ESDC) - 15 percent.
7. Engineering Support - Construction Management - 7 percent.
8. Legal and Administration Fees - 3 percent.
a. Formerly 5 percent.
9. Regulatory Compliance - 6 percent.
a. Formerly 5 percent.
Table 5.1 Revised Alternative 4 Phase 1 Cost Estimate
Facilities %
Alternative 4 - Bardenpho With
Primary Clarifiers and Digesters
Necessary Demolition $1,409,000
Remaining Demolition $5,320,000
Site Work and Yard Piping 15% $17,000,000
Landscaping $189,000
O&M Buildings Rehabilitation $3,165,000
Septage Handling $4,790,000
Headworks (Rehab, New screens x3) $4,247,000
Primary Clarifiers (Rehab x2) $2,163,000
Aeration Basins (New) $18,144,000
Blower Building (New) $4,846,000
Secondary Clarifiers (New x3) $13,942,000
RAS / WAS Pump Station (New) $3,608,000
Chemical Addition (New) $747,000
Tertiary Filtration and Utility Water System $6,053,000 Scum Handling (New) $1,462,000
Sludge Thickening (Rehab x1 GT, New x2 GT, New
RDTs x 2)
$10,209,000
Digestion (Rehab x1, New x2) $12,268,000
Sludge Storage (Rehab Dig. No. 1) $1,152,000
Dewatering (New x 4) $14,664,000
VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-14
Facilities %
Alternative 4 - Bardenpho With
Primary Clarifiers and Digesters
Boiler Facility (New Boiler x1) $3,630,000
Gas Handling and Flare (New flare x2) $2,530,000
Electrical Building (New x1) $1,596,000
Cogeneration (New x1 engine, battery bank and
microgrid)
$6,772,000
Electrical, Instrumentation, and Controls (New) 20% $21,071,000 Difficulty of Construction Factor 10% $16,098,000
Total Direct Cost(5) $177,100,000
Contingency(1) 30% $53,130,000
General Conditions(2) 12.5% $28,779,000
General Contractor Overhead, Profit, and Risk(3) 15% $38,852,000 Sales Tax(4) 8.75% $10,073,000
Escalation to Midpoint (2034)(2) 3.7% $100,863,000
Total Estimated Base Construction Cost
(2034 $USD) (5)
$408,800,000
Design, CM, Admin, and Regulatory Compliance 31% $126,728,000 Total Estimated Project Cost (2034 $USD)(5) $536,000,000 Notes:
CM - construction management; USD - United States dollar (1) Contingency is calculated based on the Total Direct Cost. Note that numbers are rounded. (2) General Conditions and Escalation to Midpoint are both calculated based on Total Direct Cost + Contingency. (3) General Contractor Overhead, Profit, and Risk is calculated based on Total Direct Cost + Contingency + General Conditions.
(4) Sales taxes are based on 50 percent of the Total Direct Cost + Contingency. (5) Totals may not add up due to rounding.
5.5 Conclusions
Following the evaluation of siting options, the City selected the existing WWTP site for future facility expansion. This option provides long-term benefits by leveraging existing infrastructure and minimizing operational disruptions, staff travel, and capital costs. While the existing site poses challenges related to space constraints and construction sequencing, it remains the most practical and cost-effective choice.
Alternatives involving a greenfield site or a hybrid approach were found to introduce significant operational inefficiencies, increased infrastructure costs, and greater community impact.
Alternative 4, a 4-Stage Bardenpho process with primary clarification, was selected after comprehensive modeling and evaluation of multiple treatment configurations. This alternative was chosen for its ability to reliably meet the target TN concentration of 8 mg/L, which includes a safety margin below the permit limit of 10 mg/L. It also integrates well with existing plant infrastructure and supports long-term nutrient removal goals.
The recommended solids treatment approach under Alternative 4 includes gravity thickening for primary sludge and RDT for WAS, offering operational efficiency and flexibility. Anaerobic digestion is proposed to stabilize solids, followed by sludge storage to provide flexibility and consistent feed to the mechanical VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-15
dewatering process. The system includes provisions for cake storage or direct loading for off-site disposal, providing flexibility under variable hauling conditions. Together, these decisions support a robust, integrated solution that aligns with the City's long-term treatment objectives.
For budgeting and financial planning purposes, the Phase 1 technology replacement and expansion project has an estimated construction cost of $409 million. This cost includes a contingency of 30 percent and escalation to the midpoint of construction, currently estimated as 2034. The total project cost, including engineering, construction management, legal, regulatory, and other support requirements to provide a complete project, is estimated at $536 million (2034 dollars).
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-1
CHAPTER 6 PROJECT DESCRIPTION
6.1 Introduction and Purpose
This chapter summarizes the overall project description for Phases 1 and 2. This information was used as a basis for the CEQA documentation process.
The City provides wastewater treatment services to residents, industrial, and commercial dischargers at the Santa Maria WWTP, and provides septage receiving services for the community and the region at the same location. Per a newly issued General Permit by the Central Coast RWQCB, the City is now required to comply with updated effluent discharge limits. The current treatment plant does not meet some of those effluent limits. Consequently, the proposed project would increase the treatment capacities of the wastewater system to comply with the newly issued general permit as well as address planned growth in the City.
The proposed project involves the modification and expansion of wastewater treatment facilities owned and operated by the City. The intent of the project is to expand and update the existing Wastewater Treatment Plant to accommodate the existing and future anticipated growth, provide long-term and reliable treatment, and protect the community and environment while adhering to all applicable regulations.
6.1.1 Project Applicant
City of Santa Maria, Utilities Department
2065 East Main Street
Santa Maria, CA, 93454
6.1.2 Project Location
The wastewater treatment site is located at 601 Black Road, Santa Maria, CA 93458, approximately four miles west of U.S. Highway 101, west of the City of Santa Maria, within the city limits, and in Santa Barbara County, as shown in Figure 6.1. The project area is an irregular shape located southeast of the intersection of Ray Road and West Main Street, bifurcated by Black Road. The existing Wastewater Treatment Plant is located on the west side of Black Road, and the remaining project area is located on City-owned land east of Black Road, currently being leased as interim farmland. The site occupies City-owned land, including Assessor's Parcel Numbers (APNs) 113-120-034, 117-191-010, 117-820-002, and 117-191-013. The current WWTP is situated on APN 113-120-034.
Approximately one-half of the project site is developed, consisting of preliminary and primary treatment, secondary trickling filters and secondary clarification, anaerobic digestion, sludge drying beds, percolation ponds, pumps, tanks, process areas, and associated buildings for the existing WWTP. The remainder of the site consists mainly of interim agricultural row crops with sparse cover of ruderal vegetation along the margins of the fields. Several irrigation ditches are also present along the road shoulders and in the WWTP. According to historical aerial imagery, vegetation within the project site is subject to regular anthropogenic disturbance associated with the operations of the existing facilities (i.e., vegetation VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-2
clearing, facility maintenance, and agriculture), and the site has remained in its current condition for more than 60 years. Adjacent parcels consist of agricultural fields to the north, south, east, and west; Ray Road to the west; an irrigated pasture and Atlas Performance Industries (API) Trailers to the east; Santa Maria Railroad right-of-way to the south; and an auto wrecking yard is located to the south. There are no undisturbed open spaces in the vicinity of the project site.
The project site is located within the Central Coast sub-region of the California Floristic Province (Baldwin et al. 2012) and within the Corralitos Canyon watershed (Hydrologic Unit Code 180600080503).
The project site is relatively flat with almost no topographic variation and is at an elevation of approximately 168 feet above mean sea level. There are several irrigation ditches present within the project site; however, these features are maintained and have no downstream connection to other waters.
All storm water that falls within the WWTP site is collected and treated in the plant and then sent to the percolation ponds to disposal.
As illustrated in Figure 6.2, the project will proceed within the outlined portions east and west of Black Road.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-3
Figure 6.1 Proposed Project Location
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-4
Table 6.1 Site Information
Characteristic Description
Project Size West Black Road: 210 acres
East Black Road: 100 acres
Existing Land Use Community Facilities
Surrounding Land Use Agriculture
Public Services and Utilities Water Supply: City of Santa Maria Sewage: City of Santa Maria
Fire and Police: City of Santa Maria Police and Fire
Departments
Electricity: Pacific Gas & Electric
Telecommunications: Verizon
Figure 6.2 Proposed Project Extents
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-5
6.2 Existing Wastewater Treatment Plant Operations
Over the 18-month period between July 2023 and December 2024, the WWTP received an average influent flow of 6.9 mgd. It treats the incoming domestic wastewater flow through screening and grit removal, primary clarification, primary and secondary trickling filters, secondary clarification, and disposal via percolation ponds. Separate solids handling facilities, including anaerobic digestion, are utilized to process biosolids to Class B requirements. Digested solids are partially dried in open lined sludge drying beds before the solids are trucked from the site for disposal. The current facilities at the site include the items listed in Table 6.2.
Table 6.2 Existing Structures at the Santa Maria WWTP
Existing Process Area Quantity
Liquids
Septage Receiving Station 1x
Bar Screen Facility 1x
Grit Chambers 1x
Primary Trickling Filters 2x
Primary Clarifiers 2x
Intermediate Clarifier 1x
Secondary Trickling Filters 2x
Secondary Clarifiers 2x
Percolation Ponds 18x (1)
Solids
Solids Thickeners 2x
Anaerobic Digesters 4x
Gas Flare 2x
Sludge Drying Beds (lined) 13x
Notes:
(1) Original 15 ponds plus Ponds A-1, A-2 and A-3.
6.3 Proposed Project Characteristics
The Proposed Project would provide a maximum monthly capacity of 11.5 mgd and change the biological treatment regime from trickling filters to a nutrient removal activated sludge process. The treatment processes would be constructed on the existing disturbed site and would be built in two phases. In addition, new percolation ponds would be constructed on the farmland area east of Black Road. The construction on the existing site would entail removal of several existing structures, and the addition of multiple new facilities. The existing process areas and equipment to be demolished and the new process areas and equipment to be constructed are shown in Table 6.3 and Table 6.4, respectively.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-6
Table 6.3 Structures to be Removed During Proposed Phase 1 Project Process Structure to be Removed Quantity
Primary Trickling Filters(1) 2x
Secondary Trickling Filters 2x
Sludge Drying Beds 8x
Sludge Thickeners(2) 1x
Grit Chamber 1x
Secondary Clarifiers 2x
Utility Building(3) 1x
Notes:
(1) Although both primary trickling filters are slated for demolition, there is ongoing discussion about the possibility of retaining one of these units for re-use.
(2) There are two gravity thickeners, one of which is planned for demolition and the other would be rehabilitated. (3) Will be replaced.
Table 6.4 Structures to be Constructed During Proposed Phase 1 Project Process Structures Added as part of Phase 1 Project Quantity Aeration Basins 4x(1)
Secondary Clarifier 3x
Tertiary Filters 2x
Anaerobic Digesters 2x
Dewatering Facility 1x
Sludge Storage 1x
Percolation Ponds 6x(2)
Digester Gas Flare 2x
Hot Water Boiler 2x
Utility Building 1x
Cogeneration Gas Engine 1x
Septage Treatment 1x
Notes:
(1) Preliminary estimate. The number of aeration basins to be installed will be determined as part of the preliminary and final design.
(2) The percolation ponds will be constructed as a “near-term” project – discussed in more detail in the following sections.
The proposed project is anticipated to fulfill the demands of the community beyond 2060. Phase 1, to be constructed by the end of 2034, will be sized to meet flow and loading projections until 2052, by which time construction of the Phase 2 facilities will be complete. The structures listed in Table 6.4 are for the Phase 1 expansion. The Phase 2 expansion is anticipated to be modifications and expansion to the new facilities provided in Phase 1. However, changes in future growth, regulations, and treatment objectives could significantly change both the timeline and design requirements of the Phase 2 expansion.
The preliminary layout for the Phase 1 and 2 project is shown in Figure 6.3. Facilities shown in light blue are the liquid treatment facilities that would be constructed or reused in the Phase 1 configuration, and those shown in dark blue are those that would be constructed in Phase 2. The solids handling facilities that will be provided in Phase 1 are shown in the light orange color, both new and existing. O&M facilities VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-7
are shown in green, most of which will be reused. Note that the new percolation ponds are not shown in Figure 6.3. These ponds are discussed later.
Figure 6.3 Proposed Phase 1 (Light Blue and Orange) and Phase 2 (Dark Blue) Structures on Existing WWTP Site
6.4 Near-Term Projects
To prepare the site for the upcoming Phase 1 project, some near-term projects were considered as part of the planning process. The objective was to confirm whether these projects needed to be completed prior to the Phase 1 project to ensure that the core treatment functions of the WWTP are not impacted during construction, so that the plant remains in compliance with its interim permit limits. In addition, these projects were also considered to set the stage for the construction activities that will follow in Phase 1.
The first project considered is the percolation pond expansion east of Black Road. The second was possible construction of some temporary tertiary filters to improve the quality of the existing effluent to more closely align with the initial interim discharge limits. The third project was construction of a dewatering facility and sludge storage system to create space for constructing Phase 1 secondary treatment structures. The tertiary filters and the dewatering facility projects are briefly discussed below.
Neither of these projects were ultimately selected as near-term projects.
6.4.1 Temporary Tertiary Filtration
To reduce biochemical oxygen demand and total suspended solids to facilitate meeting interim effluent limits, the City was tasked with conducting a pilot study to assess the suitability of installing a temporary tertiary filtration system. This was a requirement from the Time Schedule Compliance Plan. The City VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-8
completed piloting testing of a tertiary cloth filter unit in March 2025. Based on the results of the pilot testing, a cost estimate to provide temporary filtration to treat about 80 percent of the secondary trickling effluent was developed. The results of the pilot testing and the estimated cost to install and operate the filters were discussed with the RWQCB at a meeting in November 2025. Based on those discussions, it was concluded that the added cost of installing a temporary filtration system that would likely take years to get operational and would be an extra financial burden for the City would not be required. In addition, the RWQCB agreed to modify the interim effluent quality limits to values that more closely match what the existing WWTP can achieve. As a result, this near-term project is no longer needed and will not be constructed.
6.4.2 Dewatering Facility
A majority of the new WWTP Phase 1 and Phase 2 site improvements will be constructed in the area currently occupied by the sludge drying beds. Because of this, a new mechanical dewatering facility was considered for a near-term project to be completed prior to demolition of the existing sludge drying beds. The City conducted a preliminary evaluation of what the new dewatering facilities would look like and how they would tie into the existing plant, including road improvements to provide access for construction, and regular operation for dewatered sludge storage and removal.
After further consideration, the City decided that because of required number of tie-ins to the existing facilities, and potential interferences with the future Phase 1 facilities, it would be best not to construct the dewatering facility as a separate near-term project. Rather, this project will be incorporated into the Phase 1 project and will be constructed as an early project milestone in order to free up site space for the other Phase 1 facilities.
6.4.3 Project 1 - Percolation Pond Construction
The only project that will move forward as a near-term project is construction of new percolation ponds and the associated facilities. These ponds will be constructed on City-owned land that is currently leased for interim farming. The project will construct up to 6 new percolation ponds for a total of 42 acres of percolation ponds, within about 100 acres of available land, including contractor laydown areas, soil stockpiles, and access roads, etc. The preliminary location of the new ponds is shown in Figure 6.4. A solar array will be constructed by the City along the northeastern portion of the boundary line, which is outside of the scope of this project and due to be constructed prior to the completion of the ponds. Permanent access to the ponds will be established off Black Road. One possible access point is shown in the figure, and this will confirmed during the design phase of the project. A possible contractor laydown area for storage of equipment and materials is shown, along with areas temporarily designated for storage of spoils from excavation prior to reuse or removal from the project site.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-9
Figure 6.4 Preliminary Layout of Proposed Percolation Pond Project The depth of the new percolation ponds is expected to vary depending on the geological and morphological qualities of the soil within the project site. Current estimations put the average depth of each pond at approximately 13 feet below grade level. Associated infrastructure, including berms, would VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-10
vary in height depending on the final grading of the area; however, the maximum berm height is generally estimated to be less than 5 feet above the existing grade across the site. Given that there are 6 ponds to be installed, with an area of 7 acres each, this means that the expected excavated soil volumes will reach around 390,000 cubic yards. As noted, the designated temporary stockpile areas are also shown in Figure 6.4.
It is expected that the construction of the ponds will begin around Q3 2027 and be completed by Q3 2029.
6.5 Wastewater Treatment Plant Phase 1 Upgrades
Most of the facilities described above for Phase 1 will be constructed beginning around Q1 2030. The specific structures to be built were noted in Tables 6.3 and 6.4 above. By the time this work begins, construction of the new percolation ponds will be complete, and the Phase 1 construction activities will all occur within the limits of the existing WWTP.
Because the WWTP must continue to operate and treat wastewater during construction, the sequencing and location of the proposed improvements are critical. Each of the new process structures must not impact ongoing operation of the WWTP during their construction. As such, most of the new construction will occur in areas currently occupied by the existing sludge drying beds. Road improvements and underground piping improvements will be required throughout the site.
Figure 6.5 summarizes the proposed layouts for the new liquid and solids treatment Phase 1 structures.
The construction area impacted during this upgrade totals approximately 40 acres. In addition to the treatment upgrades discussed herein, the existing Utility Building is also at the end of its useful life and will be replaced as a part of Phase 1. The existing building will be demolished, and the new Utility Building will be located in the same place, but shifted south to allow greater clearance for tractor-trailer traffic through the facility for cake hauling and chemical delivery. These changes are illustrated in Figure 6.6.
Corresponding abbreviations for the acronyms highlighted in the figures are: PC: Primary Clarifier, HW:
Headworks, OP: Operations Building, GC: Grit Chamber, AD: Anaerobic Digester, SS: Solids Storage, DB:
Dewatering Building, ThF: Thickening Facility, GT: Gravity Thickener, AB: Aeration Basin, BLWR: Blower, SC:
Secondary Clarifier, TF: Tertiary Filters, C: Carbon Addition, ELEC: Electrical Building, BATT: Battery Bank and Microgrid Controller, SepTr: Septage Treatment, SepRec: Septage Receiving.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-11
Figure 6.5 Phase 1 Upgrades
Figure 6.6 Phase 1 - Preliminary Arrangement for Digester Area and Truck Routing Improvements Given the scope and size of this project, it is expected that it will take 5 years to construct, beginning in Q1 2030 and completion in Q4 2034.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A DETAILED SCREENING RESULTS
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN A-1 pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 6/Appendix A.docx
DETAILED SCREENING RESULTS
Category Technology Technology Maturity
and Risk
Screening Criteria Selected for
Further Evaluation
Justification Notes for Selection / Non-Selection for Further Evaluation (Based on BioWin process modeling for some technologies) Ability to meet regulations
Technology
Maturity & Risk
Site
Constraints
Chemical
Usage
Costs Conclusion
Activated Sludge Biological Nutrient Removal MLE Established Pass Pass Pass Pass Pass Pass Selected Will provide TN < 8 mg/L with chemical addition Oxidation Ditch Established Pass Pass Pass Pass Pass Pass Selected Easiest to operate and will provide TN < 8 mg/L 4-Stage Bardenpho Established Pass Pass Pass Pass Pass Pass Selected Provides highest level of TN removal 5-Stage Bardenpho Established Pass Pass Pass Pass Pass Pass 5-Stage Bardenpho is similar to 4-Stage Bardenpho with phosphorus removal. Although 5-Stage Bardenpho meets all the screening criteria, phosphorus removal is not anticipated to be a future requirement for the City and therefore, 5-Stage was not selected Step Feed Established Fail Pass Pass Pass Pass Fail Will not achieve TN < 10 mg/L reliably Simultaneous Nitrification / Denitrification
Emerging Pass Fail Pass Pass Pass Fail Complex operation, and more difficult to control than other processes. Could be implemented as part of an operational strategy with any of the alternatives. In addition, very susceptible to poor settling due to high risk of low DO filament growth Activated Sludge Intensification
MBR Established Pass Pass Pass Pass Fail Fail Would achieve permit requirements but has significantly higher capital and O&M costs, and additionally there are no space limitations and / or need for membrane quality effluent IFAS Established Pass Fail Pass Pass Pass Fail Not broadly applied across industry, insufficient O&M experience BAS Established Pass Fail Pass Pass Pass Fail In addition to technology maturity, lots of mechanical equipment that are points of failure and risk AGS Emerging Pass Fail Pass Pass Pass Fail Insufficient successful full-scale operating experience MABR Emerging Pass Fail Pass Pass Pass Fail Requires operation at low SRTs and needs piloting to confirm process performance, can be considered in future for capacity expansion
High-Rate A-Stage / B-Stage
(A / B)
Emerging Pass Fail Pass Pass Pass Fail Insufficient successful full-scale operating experience, complex process controls and increased risk of poor settle ability due to low DO operation, and difficulty meeting permit requirements without addition of other processes Mainstream Deammonification Emerging Pass Fail Pass Pass Pass Fail Nitrate Shunt Emerging Pass Fail Pass Pass Pass Fail
Anaerobic MBR Emerging Fail Fail Pass Pass Pass Fail
Post Secondary Removal
Nitrification Trickling Filters Established Fail Pass Pass Pass Pass Fail Would require expansion of the current trickling filter process which is an outdated process and is currently not performing well, additionally will have high chemical costs due to chemical addition Denitrification Trickling Filters Established Fail Pass Pass Fail Pass Fail BAF Established Fail Pass Pass Fail Pass Fail
MBBR Established Fail Pass Pass Pass Pass Fail
Notes: AGS - Aerobic Granular Sludge, BAF - Biologically Aerated Filter, BAS - Biofilm Activated Sludge, IFAS - Integrated Fixed-Film Activated Sludge, MABR - Membrane Aerated Biofilm Reactor, MBBR - Moving Bed Biofilm Reactor, MBR - Membrane Bioreactor, MLE - Modified Ludzack Ettinger VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B PROCESS MODELING OF LIQUID
TREATMENT ALTERNATIVES
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 6/Appendix B.docx
PROCESS MODELING OF LIQUID TREATMENT
ALTERNATIVES
Process Model Development
Steady-state process models were developed using BioWin version 6.2 (EnviroSim) for each of the future facilities process configurations. The flow and load projections developed in Volume 2: Basis of Planning were used as input for modeling of the process configurations for future facilities. The process models were developed using custom-configured unit process modules that reflect the process configuration of the selected nitrogen removal technologies. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model.
Influent Conditions
Influent conditions used for process modeling of alternatives are described in Table 1.6 in Volume 6 Chapter 1.
Wastewater Characteristics
BioWin model utilizes chemical oxygen demand (COD) modeling which uses influent COD data as an input and calculates various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) are not a direct input but are calculated based on the influent COD and wastewater fractions values. To calibrate the model to the existing wastewater treatment plant (WWTP), wastewater characteristics were sampled and analyzed as described in Volume 3. However, with the exception of ammonia (NH3) and orthophosphate fraction, the influent COD fractions were not used for modeling future facilities because the sampling event was conducted during a period when the City of Santa Maria’s (City) WWTP experienced low incoming flows and loads. The sampling event was conducted in December, and the City staff noted that incoming flows and loads are typically lower during the wet weather months. Since the historical data is more consistent and has been collected and analyzed over several years, it is considered more reliable compared to data collected during the one week of sampling event. To better match the historical data for the modeling of future facilities default influent wastewater characteristics were utilized. If wastewater characterization developed in Volume 3 was utilized for modeling purposes, the future facilities would be sized for higher loads than historical data, which would result in future facilities being oversized. The flow and load projections were also developed based on the historical influent data.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-2
Table B.1 summarizes the wastewater characteristics utilized for modeling for future facilities.
Table B.1 Wastewater Characteristics
Parameter Default Modeled
Fbs - readily biodegradable COD (including acetate) 0.16 0.16 Fus - unbiodegradable soluble 0.05 0.05
Fna - NH3 0.66 0.70
Fpo4 - phosphate 0.50 0.48
Particulate COD: VSS 1.63 1.63
BOD calculation rate constant for Xsc degradation 0.5 0.5 BOD calculation rate constant for Xsp degradation 0.5 0.5 Notes:
BOD - biochemical oxygen demand; VSS - volatile suspended solids Process Configurations
The following liquid treatment processes were modeled and evaluated. Each of the alternatives was modeled and evaluated with and without primary clarifiers (PCs) and digesters. Modified Ludzack Ettinger (MLE).
Oxidation Ditches.
4-Stage Bardenpho.
Figure B.1 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.1 MLE With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-3
Figure B.2 shows the process model configuration for MLE without the addition of PCs and digesters.
Figure B.2 MLE Without PCs and Digesters
Figure B.3 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.3 Oxidation Ditch With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-4
Figure B.4 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.4 Oxidation Ditch Without PCs and Digesters
Figure B.5 shows the process model configuration for 4-Stage Bardenpho with the addition of PCs and digesters.
Figure B.5 4-Stage Bardenpho With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-5
Figure B.6 shows the process model configuration for 4-Stage Bardenpho with the addition of PCs and digesters.
Figure B.6 4-Stage Bardenpho Without PCs and Digesters
Detailed Sizing Criteria
Table B.2 summarizes a detailed planning level sizing criteria that was developed for liquid treatment process alternatives.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-6 Table B.2 Summary of Planning Level Sizing Criteria for Alternatives Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
Recycle Streams
Thickener Overflow Flow, mgd 0.30 0.42 0.21 0.47 0.28 0.43 TSS, mg/L 717 308 900 313 735 311 TSS, lb/day 1,793 1,079 1,576 1,225 1,287 1,220 Decant from Drying Beds Flow, mgd 0.06 -- 0.05 -- 0.06 -- TSS, mg/L 1,649 -- 1,402 -- 1,641 -- TSS, lb/day 825 -- 584 -- 684 -- PCs
Flow, mgd 10 -- 10 -- 10 -- Area in Service, sf - Average 10,000 -- 10,000 -- 10,000 -- Overflow Rate, gpd/sf - Average 1,000 -- 1,000 -- 1,000 -- Overflow Rate, gpd/sf - Peak 1,900 -- 1,900 -- 1,900 -- COD, mg/L 551 -- 551 -- 550 -- CBOD, mg/L 282 -- 280 -- 282 -- TSS, mg/L 141 -- 145 -- 141 -- TKN, mg/L 74 -- 72 -- 74 -- NH3, mg/L 60 -- 58 -- 60 -- Primary Sludge
Flow, mgd 0.07 -- 0.07 -- 0.07 -- % TS 3.5 -- 3.5 -- 3.5 -- TS, lb/day 20,433 -- 20,433 -- 20,433 -- % VS 0.95 -- 0.95 -- 0.95 -- VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-7 Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
Aeration Basins
Anoxic Fraction, % 25 25 21 21 35 35 Total Volume, MG 5.9 13.4 10.1 15.0 5.9 13.0 aSRT, days Annual Average 7 11.2 11.9 11.9 7 9.7 Maximum Month 5.5 9 9.5 9.5 5.5 7.8 Total SRT, days Annual Average 8.8 15.0 15.0 15.0 9.4 15.0 Maximum Month 6.9 12.0 12.0 12.0 7.4 12.0 MLSS, mg/L 3,000 3,000 3,000 3,000 3,000 3,000 MLR, % 600 500 -- -- 400 200 HRT, hrs 14 32 18 36 14 31 DO Concentration, mg/L Aerobic Zone 1 2.0 2.0 2.0 2.0 2.0 2.0 Aerobic Zone 2 1.0 1.0 1.0 1.0 1.0 1.0 Re-aeration 0.5 0.5 Air Demand, scfm 16,200 20,600 15,600 20,600 Power Draw, hp 620 780 1,080 1,490 590 780 Methanol, lb COD/day 6,940 439 0 0 3,680 0 Secondary Clarifiers
Total Area in Service, sf - Peak 26,000 26,000 26,000 26,000 26,000 26,000 Design SVI, mL/g 150 150 150 150 150 150 Overflow Rate, gpd/sf - Average 385 385 385 385 385 385 Overflow Rate, gpd/sf - Peak 781 781 781 781 781 781 RAS Rate, % 100% 100% 100% 100% 100% 100% VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-8 Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
WAS
Flow, mgd 0.30 0.43 0.22 0.48 0.28 0.44 TSS, mg/L 6,000 6,000 6,000 6,000 6,000 6,000 TSS, lb/day 15,012 21,517 11,200 24,019 14,011 22,017 VSS, % 88 88 88 88 88 88 Effluent
COD, mg/L 63 62 63 65 62 62 CBOD, mg/L 6 4 5 5 6 4.5 TSS, mg/L 12 12 12 12 12 12 TKN, mg/L 3.2 3.1 3.4 3.6 2.9 3.2 NH3, mg/L 0.2 0.1 0.6 0.7 0.1 0.4 NO3, mg/L 6.5 6.0 0.1 0.0 5.5 4.2 NO2, mg/L 0.1 0.0 0.5 0.1 0.0 0.1 TN, mg/L 9.8 9.1 4.0 3.8 8.5 7.5 TWAS
Flow, mgd 0.07 -- 0.07 -- 0.07 -- % TS 6.0 -- 6.0 -- 6.0 -- TS, lb/day 35,028 -- 35,028 -- 35,028 -- % VS 92 -- 92 -- 92 -- Notes: aSRT - aerobic solids retention time; DO - dissolved oxygen; gpd - gallons per day; hp - horsepower; hrs - hours; HRT - hydraulic residence time; lb/day - pounds per day; MG - million gallons; mg/L - milligrams per liter; mgd - million gallons per day; mL/g - milliliters per gram; MLR - mixed liquor recirculation; MLSS - mixed liquor suspended solids; NO2 - nitrite; NO3 - nitrate; RAS - return activated sludge; scfm - standard cubic feet per minute; sf - square foot; SRT - solids retention time; SVI - sludge volume index; TKN - total Kjeldahl nitrogen; TN - total nitrogen; TS - total solids; TWAS - thickened waste activated sludge; VS - volatile solids; WAS - waste activated sludge VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX C PRELIMINARY LAYOUTS
BLWR
SS* SC SC SC HW* GC* DB
SS* BAF
TF ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
AB
ALTERNATIVE 1 - PHASE 1
BLWR
SS* SC SC SC SC HWGC BAF
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
DB AB
TF
AB AB
SS SC SC ALTERNATIVE 1 - PHASE 2
KEY:
O&M Buildings
Phase 1
Electrical Buildings
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SRS
Aqueduct Easement
Boundary HWGC
SC SCSC DB TF BLWR OP MAINT
SS SS ELEC ELEC
BAF
AB ALTERNATIVE 1 - PHASE 1
KEY:
O&M Buildings
Phase 1
Electrical Buildings
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SRS
Aqueduct Easement
Boundary HWGC
SC SC SC SC DB SC SC TF BLWR OP MAINT
SS SS ELEC ELEC
BAF
AB AB AB ALTERNATIVE 1 - PHASE 2
AD* SC SC SC TF
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
HW* ELEC
GC* PC* PC* ODODOD AD SS*
DB
ThF MAINT*
OP*
ALTERNATIVE 2 - PHASE 1
AD* SC SC SC TF
SC AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
HW ELEC
GC PC* PC* SC SC ODODOD ODOD AD SS*
DB MAINT*
OP*
ThF PCPC ALTERNATIVE 2 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
PC PC
OD ODOD
ThFAD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ALTERNATIVE 2 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
PC
PC PC
PC ODOD ODODOD
ThF AD AD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ALTERNATIVE 2 - PHASE 2
SC SC SC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ELEC
ODODODSS*
DB MAINT*
OP*
SS* HW* OD TF GC* ALTERNATIVE 3 - PHASE 1
SC SC SC SC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ELEC
SC SC ODODOD ODOD DB MAINT*
OP*
SS* SS* HWGC OD TF
ALTERNATIVE 3 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
OD ODODOD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SS ALTERNATIVE 3 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
ODOD ODODOD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SS
OD
ALTERNATIVE 3 - PHASE 2
BLWR
SC SC SC SS* C
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
PC* PC* AD* AD
AB DB
HW*GC* TF
ThF
ALTERNATIVE 4 - PHASE 1
BLWR
SC SC SC SC HW C
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building MAINT*
OP*
PC* PC* PC GC AD*ADAD SC SC
AB TF
DB
SS PC ThF
ALTERNATIVE 4 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
PC PC ThFAD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
AB
C BLWR
ALTERNATIVE 4 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
PC
PC PC
PC
ThF AD AD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
C BLWR
ALTERNATIVE 4 - PHASE 2
BLWR
SC SC SC HW* SS* ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
GC* SS*
AB TF
DB
ALTERNATIVE 5 - PHASE 1
BLWR
SC SC SC SC HW SS* ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
GC SS* SC SC
AB TF
DB
SS ALTERNATIVE 5 - PHASE 2
SC SC
SRS
HWGC
SC DB TF OP MAINT
SS ELEC ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
M = Methanol Chemical Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
BLWR SS ALTERNATIVE 5 - PHASE 1
SC SC SC
SRS
HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
M = Methanol Chemical Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
BLWR SS ALTERNATIVE 5 - PHASE 2
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX D OPERATIONS AND MAINTENANCE COSTS
PROJECT: Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria PREPARED BY: KR/DM
JOB #: COST ESTIMATE PREPARATION DATE: 07-Oct-24
LOCATION: Santa Maria, CA REVIEWED BY:
$ 5,760,000
$ 4,620,000
$ 6,460,000
$ 4,680,000
5 Bardenpho w/o PCs and Digs $ 5,270,000
4 Barndepho w/ PCs and Digs
2 Ox Ditch w/ PCs and Digs
3 Ox Ditch w/o PCs and Digs
1 MLE w/o PCs and Digs
CITY OF SANTA MARIA
ELEMENT # DESCRIPTION ANNUAL COST
The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers has no control over variances in the cost of labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown.
PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 1
DESCRIPTION : MLE w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/yr) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 2% Eq Cost Labor hours (hr/day) Unit Cost $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814 Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083 2 Aeration Basin
Mixers 3 0 15 45 34 24 293,955 $ 73,489 $ 73,489
Blowers 2 1 416 832 620 24 5,432,335 $ 1,358,084 $ 1,358,084 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041MLR Pumping 3 0 21 63 47 24 409,535 $ 102,384 $ 102,384 3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 3 3 2 5 4,403 $ 1,101 $ 1,101
4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 BAF
Effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 6 Chemical Addition
Methanol 17,739 $ 19.63 $ 348,217 $ 348,217
7 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Aerobic Sludge Storage
Aeration Blowers 1 1 28.9 29 22 24 188,784 $ 47,196 $ 47,196 Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 9 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978
Polymer Mixing 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461
Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 25829 $73 $ 1,897,111.89 $ 1,897,112
Polymer Consumption (20lb/DT) 77,486 $ 2.95 $ 228,583 $ 228,583 10 Maintenance $ 976,000 $ 976,000
SUM $ 5,759,818
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 2
DESCRIPTION : Ox Ditch w/ PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/yr) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Usage (gal/yr) Unit Cost ($/gal) Propane Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 2% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Primary Treatment 1 0 40 40 30 24 261,293 $ 65,323 $ 65,323 3 Aeration Basin
Mech Aerators 1,074 1,074 801 24 7,015,725 $ 1,753,931 $ 1,753,931Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041 4 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721WAS pumping 1 1 2 2 1 5 2,048 $ 512 $ 512 5 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 6 Primary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
7 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Sludge Thickening
Thickeners 3 1 2.55 8 6 7 10,382 $ 2,596 $ 2,596Thickened Sludge Pumps 2 1 6.375 13 10 7 17,304 $ 4,326 $ 4,326 Polymer Mixing 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730
Drain Pumps 1 1 8.5 9 6 7 11,536 $ 2,884 $ 2,884
Polymer Consumpion (12lb/DT) 66,902 $ 2.95 $ 197,362 $ 197,362 9 Anaerobic Digestion
Mixing Pumps 2 2 63.75 128 95 24 832,872 $ 208,218 $ 208,218 Sludge Transfer Pumps 2 1 21.25 43 32 24 277,624 $ 69,406 $ 69,406 Propane 1,520 $ 3.50 $ 5,319 $ 5,319
10 Aerobic Sludge Storage
Sludge Transfer Pumps 2 1 21.25 43 32 7 57,680 $ 14,420 $ 14,420 11 Dewatering Building
Screw Press 3 1 6.375 19 14 7 25,956 $ 6,489 $ 6,489
Polymer Mixing 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730
Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 12394 $32 397,739 $ $ 397,739Polymer Consumption (28lb/DT) 69,409 $ 2.95 $ 204,757 $ 204,757 12 Maintenance $ 1,112,000 $ 1,112,000
SUM $ 4,618,033
Notes
(1) Biosolids disposal costs based on current disposal operations: 70% of biosolids sent to Engel & Grey, 30% of biosolids sent to the City's landfill.
Process Power Carbon Addition Polymer Propane Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 3
DESCRIPTION : Ox Ditch w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (lb chemical/yr) Unit Cost ($/lb) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Aeration Basin
Mech Aerators 1,487 1,487 1109 24 9,713,578 $ 2,428,394 $ 2,428,394Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041 3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721WAS pumping 1 1 4 4 3 5 4,914 $ 1,229 $ 1,229 4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
6 Aerobic Sludge Storage
Aeration Blowers 1 1 28.9 29 22 24 188,784 $ 47,196 $ 47,196 Sludge Transfer Pumps 2 1 21.25 43 32 24 277,624 $ 69,406 $ 69,406 7 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978Polymer Metering Pump 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 28315 $73 2,079,772 $ $ 2,079,772Polymer Consumption (20lb/DT) 84,946 $ 2.95 $ 250,592 $ 250,592 8 Maintenance $ 995,500 $ 995,500
SUM $ 6,456,639
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 4
DESCRIPTION : Barndepho w/ PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Usage (gal/yr) Unit Cost ($/gal) Propane Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Primary Treatment 1 0 42 42 31 24 274,358 $ 68,589 $ 68,589 3 Aeration Basin
Mixers 6 0 15 90 67 24 587,910 $ 146,977 $ 146,977
Blowers 2 1 321 643 479 24 4,197,713 $ 1,049,428 $ 1,049,428 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041
MLR Pumping 3 0 17 50 37 24 327,628 $ 81,907 $ 81,907
4 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 2 2 2 5 2,867 $ 717 $ 717
5 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 6 Chemical Addition
Micro-C 153,838 4.61 $ 709,191 $ 709,191
7 Primary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
9 Sludge Thickening
Thickeners 3 1 2.55 8 6 7 10,382 $ 2,596 $ 2,596
Thickened Sludge Pumps 2 1 6.375 13 10 7 17,304 $ 4,326 $ 4,326 Polymer Pumps 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730 Drain Pumps 1 1 8.5 9 6 7 11,536 $ 2,884 $ 2,884
Polymer Consumpion (10lb/DT) 76,819 $ 2.95 $ 226,615 $ 226,615 10 Anaerobic Digestion
Mixing Pumps 2 2 63.75 128 95 24 832,872 $ 208,218 $ 208,218Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 Propane 1,520 $ 3.50 $ 5,319 $ 5,319
11 Sludge Storage
Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 12 Dewatering Building
Screw Press 3 1 6.375 19 14 7 25,956 $ 6,489 $ 6,489Polymer Metering Pump 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652 Cake Hauling 13557 $32 435,044.53 $ $ 435,045
Polymer Consumption (28lb/DT) 75,919 $ 2.95 $ 223,962 $ 223,962 13 Maintenance $ 889,000 $ 889,000
SUM $ 4,674,501
Notes
(1) Biosolids disposal costs based on current disposal operations: 70% of biosolids sent to Engel & Grey, 30% of biosolids sent to the City's landfill.
Process Power Carbon Addition Polymer Propane Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 5
DESCRIPTION : Bardenpho w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (lb chemical/yr) Unit Cost ($/lb) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814 Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083 2 Aeration Basin
Mixers 6 0 15 90 67 24 587,910 $ 146,977 $ 146,977
Blowers 2 1 416 832 620 24 5,432,335 $ 1,358,084 $ 1,358,084 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041
MLR Pumping 3 0 8 25 19 24 163,814 $ 40,954 $ 40,954
3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 3 3 2 5 4,505 $ 1,126 $ 1,126
4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
6 Aerobic Sludge Storage
Aeration Blowers 1 1 34 34 25 24 222,099 $ 55,525 $ 55,525 Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 7 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978
Polymer Metering Pump 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 25629 $73 1,882,456.17 $ $ 1,882,456
Polymer Consumption (20lb/DT) 76,887 $ 2.95 $ 226,817 $ 226,817 8 Maintenance $ 950,500 $ 950,500
SUM $ 5,267,232
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1)
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 7: Water Reuse and Liquid
Disposal
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 7: Water Reuse and Liquid
Disposal
FINAL/ October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.24 11:19:30-07'00'
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 7/_Cover-SealPage-TOC-Abbrev.docx Contents
CHAPTER 1 REUSE FEASIBILITY STUDY
1.1 Introduction 1-1
1.1.1 Purpose and Scope 1-1
1.2 Background 1-2
1.2.1 Study Area Description and Demographics 1-2
1.3 Water Supply Characteristics 1-3
1.3.1 Water Sources and Water Rights 1-3
1.3.2 Long-Term Water Supply Reliability 1-6
1.4 Water Use and Demands Projections 1-7
1.5 Projected Water Supply Versus Demands 1-8
1.6 Wastewater Characteristics and Facilities 1-8
1.6.1 Wastewater Treatment 1-8
1.7 Treatment Requirements for Reuse 1-9
1.7.1 Non-potable Recycled Water Regulations 1-9
1.7.2 Title 22 Use Area Requirements 1-11
1.7.3 Summary Treatment Requirements for Agricultural Reuse 1-12
1.7.4 Summary Treatment Requirements for Urban Reuse 1-13
1.7.5 General Irrigation Use Guidelines 1-13
1.8 Overview of Recycled Water Market 1-15
1.8.1 Agricultural Reuse 1-15
1.8.2 Urban Reuse 1-15
1.9 Agricultural Reuse 1-15
1.9.1 Demand Analysis - Market Identification and Quantification 1-15
1.10 Urban Reuse 1-24
1.10.1 Demand Analysis - Market Identification and Quantification 1-24
1.11 Viable Reuse Users/Opportunities 1-26
1.11.1 City-Owned Agricultural Land 1-26
1.11.2 Urban Development Complex 1-28
1.12 Project Alternatives Analysis 1-32
1.12.1 Pipeline Routing and Sizing 1-33
1.12.2 Alternative 1 1-33
1.12.3 Alternative 2 1-36
1.12.4 Alternative 3 1-38
1.12.5 Alternative 4 1-40
1.13 Planning and Design Assumptions 1-42
1.14 Key Infrastructure Components 1-42
1.14.1 Booster Pump Stations 1-42
1.14.2 Reservoir: Storage 1-44
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
1.14.3 Treatment Process Requirements for Title 22 Compliance 1-45
1.15 Planning Level Cost Estimates 1-46
1.16 Evaluating the Need for a Recycled Water Program 1-47
1.17 Conclusions 1-49
CHAPTER 2 EFFLUENT DISPOSAL
2.1 Introduction 2-1
2.1.1 Overview 2-1
2.1.2 Evaluation of Percolation Pond Performance 2-2
2.1.3 Pond Operations 2-4
2.2 Pond Area Estimates 2-5
2.2.1 Historical Percolation Pond Area 2-5
2.2.2 Updated Pond Area Survey 2-6
2.3 Pond Soils Assessment 2-7
2.3.1 Soils and Hydrogeological Investigation 2-7
2.4 Water Balance and Pond Capacity 2-8
2.4.1 Methodology 2-8
2.4.2 Pond Area Assessment 2-9
2.4.3 Water Balance Analysis 2-12
2.4.4 Maximum Pond Capacity Analysis 2-12
2.4.5 Results 2-15
2.4.6 Pond Percolation Capacity 2-18
2.5 Pond Rehabilitation and Cost 2-19
2.5.1 Need for Additional Percolation Pond Capacity 2-19
2.6 Conclusions/Recommendations 2-21
Appendices
APPENDIX A PRELIMINARY COST ESTIMATES
APPENDIX B CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
APPENDIX C YEH AND ASSOCIATES GEOTECHNICAL DATA REPORT
APPENDIX D GSI WATER SOLUTIONS PERCOLATION POND PERFORMANCE EVALUATION
APPENDIX E PROJECT MEMORANDUM - PERCOLATION POND EVALUATION
APPENDIX F SUMMARY OF PRIOR POND REHABILITATION WORK AND COST ESTIMATES FOR SOIL
CLEANING
Tables
Table 1.1 Population - Current and Projected 1-2
Table 1.2 Current and Projected Water Supplies (AFY) for the City 1-3 Table 1.3 Wholesale Supplies - Existing and Planned Sources of Water (Long-Term Average) 1-5
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Table 1.4 Groundwater Pumping Rights 1-6
Table 1.5 Supply Reliability for the City for Year 2040 1-7 Table 1.6 Current and Projected Water Use (AFY) for the City 1-8 Table 1.7 Current and Projected Water Supply Versus Demands (AFY) 1-8 Table 1.8 Summary Title 22 Recycled Water Types 1-10
Table 1.9 Comparison of Santa Maria's Treated Effluent Quality With Irrigation Water Quality Criteria 1-14
Table 1.10 Crop Acreages in 1-, 2-, and 5-Mile Buffers 1-16 Table 1.11 Monthly ET₀ Values (Inches per Month) for Zone 3 1-19 Table 1.12 Crop-Specific Kc Crop Coefficient Values 1-20 Table 1.13 Turf Grass Kc Crop Coefficient Values (From CIMIS) 1-31 Table 1.14 Alternative 1: Pipeline Specifications 1-33
Table 1.15 Alternative 2: Pipeline Specifications 1-36
Table 1.16 Alternative 3: Pipeline Specifications 1-38
Table 1.17 Alternative 4: Pipeline Specifications 1-40
Table 1.18 Alternative Parameter Summary 1-42
Table 1.19 Planning and Design Criteria 1-42
Table 1.20 Pump Station Sizing Requirements 1-44
Table 1.21 Storage Capacity Requirements 1-45
Table 1.22 Estimated Pond Surface Areas 1-45
Table 1.23 Summary of Preliminary Cost Estimates 1-46
Table 2.1 Average Effluent Discharge - July 2023 to December 2024 2-1 Table 2.2 Percolation Pond Construction and Performance 2-3 Table 2.3 Percolation Pond Areas 2-5
Table 2.4 Summary of Parameters Used to Obtain a Water Balance 2-8 Table 2.5 Percolation Pond Estimation Descriptions 2-9
Table 2.6 Pond 15 Topographic Survey Results - Area Estimation 2-10 Table 2.7 Calculated Percolation Pond Average Surface Areas 2-11 Table 2.8 Summary of Method Used to Determine the Water Balance 2-12 Table 2.9 Percolation Pond Maximum Depths 2-12
Table 2.10 Correction Factors For Calibrating New and Old Pond Depth Measurements 2-13 Table 2.11 Percolation Pond Rehabilitation and Estimated Cost 2-19 Figures
Figure 1.1 Zoning Map 1-4
Figure 1.2 Statewide Crop Mapping Dataset (i15) With 1-, 2-, and 5-Mile Buffers 1-17 Figure 1.3 Statewide Crop Mapping Dataset (i15) With 1- and 2-Mile Buffer Showing Crop Distribution 1-18
Figure 1.4 CIMIS Reference Evapotranspiration Zone Classifications 1-21 Figure 1.5 Monthly Irrigation Demand Graph for 1-Mile Buffer 1-22 Figure 1.6 Monthly Irrigation Demand Graph for 2-Mile Buffer 1-22 Figure 1.7 Monthly Irrigation Demand Graph for 5-Mile Buffer 1-23 Figure 1.8 Spatial Distribution of Urban Water Demand 1-25 Figure 1.9 Layout of City-Owned Agricultural Land 1-27
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
Figure 1.10 Monthly Irrigation Demand Graph for City-Owned Agricultural Land 1-28 Figure 1.11 Map of Urban Development Complex Showing the Total Irrigable Area for the Different Urban Users 1-30
Figure 1.12 Monthly Irrigation Demand Graph for Urban Development Complex 1-32 Figure 1.13 Pipeline Route: Alternative 1 1-35
Figure 1.14 Pipeline Route: Alternative 2 1-37
Figure 1.15 Pipeline Route: Alternative 3 1-39
Figure 1.16 Pipeline Route: Alternative 4 1-41
Figure 2.1 Aerial View of Existing WWTP and Percolation Ponds (2023) 2-2 Figure 2.2 Visual Comparison of Percolation Pond Performance in 2023 2-4 Figure 2.3 Topographic Survey Data for Percolation Ponds (2025) 2-6 Figure 2.4 Schematic of Pond Water Balance Calculation 2-9 Figure 2.5 Topographic Analysis of Pond 15 - Total Pond Overview 2-10 Figure 2.6 Topographic Analysis of Pond 15 - Zoomed-in View of Contours 2-11 Figure 2.7 Topographic and Aerial of Pond 4 2-14
Figure 2.8 Daily Influent Flow to the WWTP and 30-Day Rolling Average 2-15 Figure 2.9 Total Working Volume in All Ponds 2-17
Figure 2.10 Calculated Monthly Average Volume Percolated 2-18 Figure 2.11 Preliminary Layout for the Proposed New Percolation Ponds 2-20 VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vi
Abbreviations
AF acre-feet
AFY acre-feet per year
BOD5 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
CAD computer-aided design
CBOD carbonaceous biochemical oxygen demand
CCR California Code of Regulations
CCWA Central Coast Water Authority
CIMIS California Irrigation Management Information System CIP Capital Improvement Plan
City City of Santa Maria
CPT cone penetration test
CT Concentration Time
DDW Division of Drinking Water
DWR Department of Water Resources
EIR Environmental Impact Report
ET evapotranspiration
ft foot/feet
ft3 cubic feet
GIS geographical information system
gpm gallons per minute
GSI GSI Water Solutions
GSWC Golden State Water Company
GW groundwater
hp horsepower
L liter
µS/cm micro-Siemens per centimeter
MG million gallons
mg milligrams
mg/L milligrams per liter
mgd million gallons per day
min minute
mL milliliters
MPN most probable number
N/A not applicable
NOA Notice of Applicability
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vii
NTU nephelometric turbidity unit
O&M operations and maintenance
psi pounds per square inch
PVC polyvinyl chloride
RWQCB Regional Water Quality Control Board
SBCAG Santa Barbara County Association of Governments
SWP State Water Project
SWRCB State Water Resources Control Board
TDH total dynamic head
TDS total dissolved solids
TSCP Time Schedule Compliance Plan
TSS total suspended solids
UV ultraviolet
UWMP Urban Water Management Plan
WWTP wastewater treatment plant
Yeh Yeh and Associates
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 REUSE FEASIBILITY STUDY
1.1 Introduction
This chapter aims to assess the feasibility and potential benefits of implementing a recycled water program for the Santa Maria Wastewater Treatment Plant (WWTP). The City of Santa Maria (City) currently percolates all the secondary effluent from its WWTP into the groundwater basin of which a calculated amount is applied as a return flow credit that is added to the City's water rights. While this method has been a longstanding practice, as part of this long-range master planning effort an evaluation of alternative uses for the treated effluent is being considered. In addition, the City is required to evaluate the feasibility of implementing reuse as a requirement of the City's waste discharge permit.
Specifically, this chapter will explore if beneficial reuse of treated effluent, such as for agricultural and urban irrigation/reuse presents a more sustainable and advantageous approach compared to continued percolation. The evaluation will consider technical requirements, demands analysis, identifying viable users and outlining their infrastructure needs, regulatory compliance, financial viability, and ultimately conclude if reuse would be in alignment with the City's long-term water resource planning objectives.
The objective of this analysis is to provide a technical foundation for understanding recycled water implementation possibilities, ensuring alignment with the regulatory framework.
1.1.1 Purpose and Scope
This study examines the feasibility of various recycled water applications, primarily for agricultural and urban irrigation, within the vicinity of the City. This evaluation includes:
Estimating demands for the available agricultural/urban users. Identifying potential reuse opportunities within the City. Assessing viable users for recycled water distribution. Determining infrastructure needs, including storage, pipelines and routing, and treatment technologies.
Evaluating regulatory requirements to ensure compliance with California Title 22 standards. Conducting a cost analysis to outline financial considerations.
By bringing these together, this chapter provides a foundation for understanding how and where recycled water could be integrated into existing water management practices if deemed advantageous.
Potable reuse scenarios are not being evaluated in this chapter, as the City does not have a water supply/demand imbalance that would necessitate implementing expensive projects such as the Indirect Potable Reuse. Further details on the City's Water Supply/demands are discussed in Sections 1.3, Water Supply Characteristics, and 1.4, Water Use and Demands Projections.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
1.2 Background
1.2.1 Study Area Description and Demographics
Santa Maria is located in the Santa Maria Valley within Santa Barbara County, California. It is bounded on the north by the Santa Maria River and the San Luis Obispo County line and includes a mix of developed and undeveloped areas to the west, east, and south of the City limits. The study area for this project focuses on a 5-mile radius from the City's WWTP, capturing the potential users and opportunities for water reuse.
1.2.1.1 Land Use
The City encompasses a variety of land uses, including residential, commercial, agricultural, industrial, and public spaces, reflecting its historical development from predominantly agricultural land to a more diverse urban landscape. The City’s land area is primarily characterized by residential and commercial uses. The City's urban development has historically followed a pattern of outward expansion, with annexation of surrounding lands to accommodate new housing and employment growth.
Figure 1.1 illustrates the land use distribution in the City. Residential developments represent the majority of land use in Santa Maria, with a predominance of single-family homes. The remaining portion of the City's land use is distributed between commercial and industrial uses. A majority of the agricultural land in the vicinity of the WWTP is comprised of truck nursery and berry crops.
Santa Maria's service area encompasses both incorporated and unincorporated areas of Santa Barbara County. While most of the service area falls within City limits, approximately 99 acres of the unincorporated county receive water from the City, and another 96 acres within the City limits are served by the Golden State Water Company (GSWC). This means that over 95 percent of the City's population relies on the municipal water system (2020 Urban Water Management Plan [UWMP] Santa Maria).
1.2.1.2 Population
The Santa Maria General Plan Update and the Santa Barbara County Association of Governments (SBCAG) forecast developed population, jobs, and housing projections until 2050, as presented in Volume 2:
Chapter 5, Table 5.1. This projection accounts for reduced growth rates over time, meaning the population will grow more quickly initially before tapering off in later years. A population deviation of 10 percent is included to account for any potential changes in real-world conditions. A summary of historic and projected population within the City's service boundaries is presented in Table 1.1.
Table 1.1 Population - Current and Projected(1)
Year Service Area Population
2010 99,553
2020 107,407
2030 127,600 ± 12,000
2040(2) 135,350 ± 13,600
2050 143,100 ± 14,500
Notes:
(1) Source: Santa Maria General Plan Update (2020).
(2) Estimated based on the Santa Maria General Plan Update (2020).
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Santa Maria has an average household size of 3.77 people, and while the City does not fully meet the criteria for a disadvantaged community, some areas are classified as a disadvantaged community based on state mapping tools. The City's median household income was estimated at $59,366 in 2018, which is approximately 93.1 percent of the statewide median (2020 UWMP Santa Maria).
1.3 Water Supply Characteristics
1.3.1 Water Sources and Water Rights
Santa Maria benefits from a multi-source water portfolio that ensures supply reliability across various hydrologic conditions. Table 1.2 summarizes the current and planned water supplies available to the City between 2020 and 2045. This information is based on the Stipulation and data provided by Central Coast Water Authority (CCWA), extracted from the 2020 UWMP.
The Stipulation defines the City's Water Rights in the Santa Maria Groundwater Basin. Under this agreement, established through the Santa Maria Groundwater Adjudication (Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al., Case No. 770214), the City has been assigned 5,100 acre-feet per year (AFY) of prescriptive groundwater rights and 14,300 AFY from Twitchell Reservoir recharge operations. Additionally, the Stipulation entitles the City to capture 65 percent of every acre-feet (AF) of State Water Project (SWP) water that is brought into the Basin by the City as an additional groundwater source from the Basin, reinforcing its long-term water supply reliability. A five-year rolling average of SWP water imported by the City multiplied by 0.65 is used to determine the City's additional water right.
Table 1.2 Current and Projected Water Supplies (AFY) for the City(1) Source 2020 2025 2030 2035 2040 2045
SWP Water(2) 10,492 10,399 10,305 10,212 10,118 10,025
Groundwater(3) 5,100 5,100 5,100 5,100 5,100 5,100
Twitchell Yield/Commingled GW(4) 14,300 14,300 14,300 14,300 14,300 14,300 Return Flows From SWP Water(5) 6,820 6,759 6,698 6,638 6,577 6,516 Total Supply Available 36,712 36,558 36,403 36,250 36,095 35,941 Notes:
GW - groundwater
(1) Source: 2020 UWMP, Table 6.1.
(2) Volumes shown for all years are based on the long-term reliability documented in The SWP Final Delivery Capability 2019 Report (California Department of Water Resources, Natural Resources Agency, 2020). (3) Groundwater supplies are based on prescriptive rights in Santa Maria Groundwater Basin as defined in the Judgement.
Pursuant to the Court's Phase 5 Statement of Decision, the City has been assigned 5,100 AFY of prescriptive right. (4) Further details can be found in Exhibit "F" of the Stipulation. (5) Pursuant to the Stipulation, the City is entitled to recapture 65 percent of its SWP purchases in the Basin based on a 5-year rolling average.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO