Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) B. Definitions:

1. Core Wall - That portion of the concrete tank wall that is circumferentially post-tensioned.

2. Prestressed Concrete - Concrete in which internal compressive stresses of such magnitude and distribution have been introduced through post-tensioning to offset tensile stress development from service loads.

3. Prestressing Reinforcement - High-strength steel used to prestress the concrete tank wall.

4. Rebound - The shotcrete material that ricochets off of the receiving surface and falls.

5. Shotcrete - Pneumatically applied wet mortar or concrete used for embedment protection of the circumferential prestressed wall reinforcement.

6. Strand - A symmetrically arranged and helically twisted assembly of seven high-strength steel wires used for prestressing reinforcement or as nonprestressed seismic cables.

7. Stressing Machine - May refer to the automated wrapping machinery used to post-tension the strand around the tank circumference or vertical post-tensioning equipment used to post-tension vertical thread bars.

8. Tank Contractor - A qualified tank manufacturer and/or contractor that specializes in the design and construction of an AWWA D110 type of tank specified herein.

9. Tendon - High-strength thread bar, including end anchorages, used to impart vertical prestressed forces to the tank wall.

10. Wire - High-strength, cold-drawn steel wire used to assemble strands.

C. Reference Standards:

1. American Concrete Institute (ACI):
a. ACI 301-16 - Specifications for Structural Concrete, 2016. b. ACI 305.1-14 - Specification for Hot Weather Concreting, 2014. c. ACI 306.1-90 - Standard Specification for Cold Weather Concreting, 1990. d. ACI 350-06 - Code Requirements for Environmental Concrete Structures and Commentary, 2006.
e. ACI 350.1-10 - Specification for Tightness Testing for Environmental Engineering Concrete Containment Structures and Commentary, 2010. f. ACI 350.3-06 - Seismic Design of Liquid-Containing Concrete Structures and Commentary, 2006.
g. ACI 350.5-12 - Specifications for Environmental Concrete Structures, 2012.
h. ACI 372R-13 - Design and Construction of Circular Wire- and Strand-Wrapped Prestressed Concrete Structures, 2013.
i. ACI 506R-16 - Guide to Shotcrete, 2016.
j. ACI 506.2-13 - Specification for Shotcrete, 2013.

2. ASTM International (ASTM):
a. A 185 - Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete.
b. A 416 - Standard Specifications for Steel Strand, Uncoated Seven-Wire for Prestressed Concrete.
c. A 475 - Standard Specification for Zinc-Coated Steel Wire Strand. d. A 615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.

Page 1820 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) e. A 706 - Standard Specification for Low-Alloy Deformed and Plain Bars for Concrete Reinforcing.
f. A 722 - Standard Specification for Uncoated High-Strength Steel Bars for Prestressed Concrete.
g. C 33 - Standard Specification for Concrete Aggregates. h. C 150 - Standard Specification for Portland Cement.
i. C 171 - Standard Specification for Sheet Materials for Curing Concrete. j. C 618 - Type F Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
k. D 570 - Standard Test Method for Water Absorption of Plastics. l. D 624 - Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers.
m. D 638 - Standard Test Method for Tensile Properties of Plastics. n. D 746 - Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact.
o. D 747 - Standard Test Method for Apparent Bending Modulus of Plastics by Means of a Cantilever Beam.
p. D 792 - Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement.
q. D 1056 - Standard Specification for Flexible Cellular Materials- Sponge or Expanded Rubber.
r. D 2000 - Standard Classification System for Rubber Products in Automotive Applications.
s. D 2240 - Standard Test Method for Rubber Property-Durometer Hardness.

3. American Society of Civil Engineers (ASCE):
a. 7-10 - Minimum Design Loads for Buildings and Other Structures.

4. American Water Works Association (AWWA):
a. C652 - Standard for Disinfection of Water-Storage Facilities. b. D110-13 - Wire- and Strand-Wound, Circular, Prestressed Concrete Water Tanks, 2013.

5. Code of Federal Regulations (CFR):
a. Part 1910 - Occupational Safety and Health Standards (OSHA).

6. NSF International (NSF):
a. 61 - Drinking Water System Components - Health Effects.

7. U.S. Army Corps of Engineers (USACE):
a. CRD C 572 - Corps of Engineers Specifications for Polyvinylchloride Waterstop.

1.03 SUBMITTALS
A. Product data:

1. Waterstops:
a. Submit samples, prints, and complete physical property data covering waterstops.
b. Laboratory test reports: Submit reports indicating that average properties of polyvinyl chloride waterstops material and finish conform to requirements specified in this Section.

2. Epoxy grouting equipment: Submit product information.

3. Neoprene bearing pads: Submit product information.

Page 1821 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

4. Stressing machine:
a. Submit a description of the proposed equipment.
b. Submit calibration reports for force recording equipment used installation of vertical thread bars and circumferential prestressing.

B. Shop drawings:

1. Drawings showing all plan views, sections, and details of the tank construction, including, but not limited to, all structural elements, all appurtenances, connections, joints, waterstop, roof hatches, vents, ladders, fall arrest and protection systems, guardrails, piping, pipe penetrations, pipe supports, sub-grade preparation, base liners, tank instrumentation, and materials for roof drainage and conductance.

2. Drawings of entire prestressing operation showing vertical thread bar and circumferential strand placement with associated schedules and intermediate lock-off elevations, prestressing bar and strand size, ducts for vertical thread bars, and anchorage details.

3. Drawings for placement and detailing of all reinforcing steel.

4. Drawings showing:
a. Neoprene bearing pads and methods of pad installation. b. Waterstop and methods of installation.
c. Sponge filler pads or sleeves and methods of installation. d. Exterior coating system.

5. All shop drawings shall be signed and sealed by a registered California structural or civil engineer.

C. Design submittals:

1. Structural calculations for all aspects of the structural design of the tank, along with calculations for prestressing reinforcement, elongation estimates, soil capacity checks, and calculations for any other structural design aspect.

2. Concrete mix designs in accordance with Section 03300 - Cast-in-Place Concrete and additional provisions specified herein.

3. Shotcrete mix designs in accordance with the provisions specified herein.

4. Admixtures to be used in the concrete and/or shotcrete and their purpose.

5. All design submittals shall be signed and sealed by a registered California structural or civil engineer.

D. Tank responsibility statement:

1. The Tank Contractor shall submit a statement attesting that they have assumed responsibility for the tank design and construction. The statement shall be signed and sealed by the Tank Contractor’s
engineer-in-responsible-charge of the tank design. No other submittal items will be reviewed until a satisfactory statement has been received.

E. Qualification Statement:

1. Failure to submit a qualifications statement package will be deemed an irregularity, which will cause bid to be rejected as nonresponsive.

2. Submit pertinent information that demonstrates conformance with Quality Assurance requirements specified herein.

Page 1822 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

3. To include:
a. Company history, contact person(s), address, and telephone number. b. Project references with owner and engineer’s contact information. c. Name and work history of the on-site project manager to be assigned to the project.

F. Quality control submittal:

1. Certificates of Compliance:
a. Thread Bars: Submit certified test reports that verify bars and anchorage meet specified material standards.
b. Waterstop: Submit certificates certifying that waterstops provided on this project meet or exceed physical property requirements of current USACE CRD C 572.
c. Circumferential prestressing: Submit certified test reports for each size, heat, and reel that verify conformance to applicable ASTM standards for materials, strength, and yield properties.

G. Test reports:

1. Strand and vertical thread bar prestressing records.

H. Manufacturer's instructions:

1. Tank appurtenances: Submit manufacturer’s installation instructions.

1.04 NON-RESPONSIVE BID
A. Qualifications statement package:

1. Submit a qualifications statement package with the bid. The package shall contain information as required per Section 1.03.E.

2. Failure to submit a qualifications statement package will be deemed an irregularity that may cause bid to be rejected as non-responsive.

1.05 QUALITY ASSURANCE
A. Qualifications:

1. Singular Responsibility:
a. It is the intent of these Specifications to create singular responsibility for design, construction, and performance of the prestressed concrete tank.

The design and construction of all aspects of the foundation, floor slab, core wall, columns, prestressing, shotcrete, and roof of the tank shall be performed by the Tank Contractor.
1) No portion of the work on the tank shall be subcontracted unless:
a) Prior acceptance is obtained from the Engineer; and
b) The Tank Contractor’s on-site project manager personally supervises the work of any subcontractors and their personnel. b. If the Tank Contractor believes that any requirement of this Section represents a departure from its normal recommendations that will affect the quality or performance of the tank, notify the Engineer in writing of such concerns. For each provision of concern, cite the relevant

Page 1823 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) paragraphs of this Section and indicate the Tank Contractor’s recommended modifications or alternatives to those provisions. 1) Acceptance of Tank Contractor’s alternatives shall be at the discretion of the Engineer, and the decision of the Engineer shall be final.

2. The specified tank shall be designed and constructed by a single Tank Contractor. The Tank Contractor shall be experienced in the design and construction of circumferentially prestressed tanks with cast-in-place concrete core wall sections using freed neoprene bearing pad connections at the top and base of the wall, PVC waterstops, seismic cables placed between the wall and the foundation, and a flat supported concrete roof deck. a. No Tank Contractor is considered qualified unless it has designed and built the following projects in its own name:
1) At least twenty circumferentially prestressed concrete tanks with flat concrete roofs conforming to AWWA D110, Type I in the last ten years.
2) At least ten circumferentially prestressed concrete tanks with flat concrete roofs conforming to AWWA D110, Type I used for potable water storage that have been in successful operation for at least five years.
3) At least five circumferentially prestressed concrete tanks with flat concrete roofs conforming to AWWA D110, Type I that are 1.5 MG or larger in the last ten years.
b. The Tank Contractor shall have in its employ a design engineer with a minimum of ten years of experience in the design of AWWA D110 Type I tanks with flat concrete roofs. The design engineer shall have been the engineer of record for a minimum of ten AWWA D110 Type I tanks designed for and constructed by the Tank Contractor in its own name. The design engineer shall be licensed as a civil or structural engineer in the state of California.
c. The Tank Contractor shall have in its employ for this project a team consisting of an on-site project manager, concrete foreman, shotcrete foreman, shotcrete nozzleman, and prestressing foreman, each of whom shall have constructed in the last ten years a minimum of five AWWA D110 Type I tanks with flat concrete roofs having a capacity of

1.5 MG or greater.
1) Experience gained on shotcrete pool and ditch construction will not be considered as qualifying experience for nozzleman.
2) Skill of nozzleman:
a) Capable of applying thin coats of even and uniform thickness. b) Certified shotcrete nozzleman in accordance with ACI 506R.

3. Experience in the design and construction of AWWA D110 Type II, Type III, or Type IV tanks will not be accepted as demonstrating the qualifications required by the preceding paragraphs.

Page 1824 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

1.06 DESIGN CRITERIA
A. Except as modified herein, the prestressed concrete tank shall be designed and constructed in compliance with the provisions of AWWA D110 for strand-wound circular, prestressed concrete water tanks with Type I core wall.

1. The prestressed concrete tank core wall shall be of cast-in-place concrete construction. Shotcrete or precast core walls are not permitted under the provisions of this Section.

B. Standards/Codes:

1. The prestressed concrete tank shall be designed and constructed as specified herein, and in accordance with provisions of the following standards and codes:
a. AWWA D110-13.
b. ACI 350-06.
c. ACI 350.3-06.
d. ASCE 7-10.

2. Where conflicts between the requirements of this Section and of these standards and codes occur, the more restrictive provisions shall apply. a. Exception: Requirements for concrete cover and member thickness shall be as specified in this Section.

C. Load criteria and requirements to be used by the Tank Contractor in the design calculations:

1. Capacity: 2.0 MG usable storage below the maximum water elevation shown on the Drawings.
a. Inside Diameter: 115 feet.

2. Dead Load: shall be the estimated weight of all permanent imposed loads. a. Unit weight of concrete shall be taken as 150 pounds per cubic foot. b. Unit weight of steel shall be taken as 490 pounds per cubic foot.

3. Fluid Load: shall be the lateral pressure and weight of the water when the tank is filled to a level that is 6 inches above the elevation of the top of the overflow elevation as indicated on the Drawings (to allow for overflow conditions). a. Unit weight of water shall be taken as 62.4 pounds per cubic foot.

4. Roof Live Load:
a. Uniform: 40 pounds per square foot, non-reducible.
b. Any concentrated reactions due to the use of fall protection equipment. c. Application of fall protection equipment reaction loads shall be applied concurrently with uniform roof live load. However, load factors for the load case where the combination of uniform and fall protection reactions are considered simultaneously may be taken as unity.

5. Construction Loads:
a. Loads applied to the tank during construction shall be accounted for in the design of the tank.

6. Geotechnical Report: See Appendices to the Specifications.

Page 1825 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

7. Foundation Loads: the tank foundation shall be proportioned so that the net foundation bearing pressure shall be less than the net allowable soil bearing pressure specified in the Geotechnical Report.
a. The allowable soil bearing pressure may be increased by 33 percent for load combinations that include wind or seismic loads.
b. Settlement Loads: the tank shall be designed to resist the effects of total and differential settlement indicated in the Geotechnical Report.

8. The final design for wind and seismic loads shall consider a reduced capacity to resist sliding due to any membranes placed between the bottom of the concrete foundation and the soil.

9. Wind Load: determined in accordance with ASCE 7-10.
a. Exposure Category C.
b. Basic Wind Speed = 104 mph (3-sec gust).
c. Importance Factor, IW = 1.00.

10. Seismic Design Criteria: seismic design shall be based on the applicable sections of AWWA D110-13, ASCE 7-10, and ACI 350.3-06. The seismic forces shall be calculated using each code separately. The total base shear used for design shall be the maximum value obtained from the three codes used.
a. When comparing force and base shear values, those obtained from ASCE and ACI shall be based on service level loads.
b. AWWA D110-13 Design Criteria:
1) Occupancy Category, IV.
2) Importance Factor, I = 1.50.
3) Mapped Spectral Acceleration for Short Period, SS = 1.48g. 4) Mapped Spectral Acceleration for 1-second Period, S1 = 1.58g. 5) Site Class D.
6) Impulsive Structure Coefficient, RI = 3.5.
7) Convective Structure Coefficient, RC = 1.0.
8) Overstrength Factor,Ωo, 2.0.
c. ASCE 7-10 Design Criteria:
1) Risk Category IV.
2) Mapped Spectral Acceleration for Short Period, SS = 1.48g. 3) Mapped Spectral Acceleration for 1-second Period, S1 = 1.58g. 4) Site Class D.
5) Response Modification Factor, R = 3.25.
6) Overstrength Factor,Ωo, 2.0.
7) Long-period Transition Period, TL = 12 sec.
8) Importance Factor, I = 1.50.
d. ACI 350.3-06 Design Criteria:
1) Mapped Spectral Acceleration for Short Period, SS = 1.48g. 2) Mapped Spectral Acceleration for 1-second Period, S1 = 1.58g. 3) Site Class D.
4) Response Modification Factor, R = 3.25.
5) Long-period Transition Period, TL = 12 sec.
6) Importance Factor, I = 1.50.
e. The sloshing wave height shall be taken as the larger of the values calculated in accordance with AWWA D110-13, ASCE 7-10, and ACI 350.3-06.
1) In the event that the calculated height of the “sloshing wave” exceeds the freeboard of the tank (distance from the maximum operating

Page 1826 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) water surface elevation to the bottom of the roof deck at the wall), the tank and the roof deck shall be designed to accommodate the dynamic effects as follows:
a) Any portion of the convective sloshing wave that extends above the top of the tank wall (bottom of the roof deck at the wall) shall be calculated and applied to the roof deck as an uplift pressure in accordance with section 15.7.6.1.2.c of ASCE 7-10.
b) Additionally, the mass of any confined portion of the convective sloshing wave shall be included with the impulsive mass used in the estimation of the hydrodynamic forces applied to the tank for design, also in accordance with section 15.7.6.1.2.c of ASCE 7-10.
c) Any revisions to the tank, including but not limited to, the roof elevation, water overflow level, and roof slab that are required to meet the specified provisions to resist sloshing loads and its effect on the hydrodynamic design shall not result in additional costs to the Owner.

11. Temperature and moisture gradients: effects due to changes in temperature and due to temperature and moisture gradients across structural members shall be considered in the design. Refer to Section 1850 - Design Criteria.

12. Prestressing application: forces applied to the wall shall be considered in the design of the wall, especially where wall penetrations result in locally increased prestressing force application to the wall.

13. On screen mesh size and screen open area:
a. The vent shall be sized for a minimum rate of 750 cfm or the rate of volumetric withdrawal assuming the outlet pipe has ruptured, whichever is greater.

14. Overflow Design Capacity: 2,000 gpm with maximum 9-inch water height over the top of the overflow weir.

D. Floor Slab and Wall Footing Requirements:

1. The floor slab shall be designed as a membrane floor slab as defined in ACI 372R, Section 3.2.2 that is not less than 24 inches thick; or the floor slab may be designed as a slab-on-ground with a thickness not less than 24 inches.

2. Construction joint locations shall be submitted to the Engineer for review. a. Where construction joint spacing exceeds 50 feet, provide means for reducing shrinkage below the limit specified in Section 03300 - Cast-in-Place Concrete in proportion to the extent the spacing limit of 50 feet is exceeded.
b. Use of construction joints in the floor slab shall be minimized.

3. Minimum ratio of floor slab reinforcement area to concrete area shall be

0.5 percent for each orthogonal direction, with bars spaced no greater than 12 inches on center or two times the slab thickness, whichever is less.

4. Minimum concrete cover over reinforcing steel shall be in accordance with Table 3.3.2.3 of ACI 350.5.

Page 1827 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-11 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

5. Wall footings shall bear below floor sub-grade and shall be placed monolithically with the floor slab.
a. The bottom of the wall footing shall be embedded a minimum of 60 inches below the lowest finish grade elevation over the outside edge of the footing or as indicated on the Drawings, whichever is greater.

6. Design of the floor and wall footing shall consider the differential base stiffness and at concrete encasements or hard points below the floor and wall footing.

E. Column Footing Design Requirements:

1. Column footings shall be designed in accordance with ACI 350.

2. Column footings shall be constructed on top of the floor slab (no projections below the floor slab).

3. Where column footings are to be located, recess the floor slab 2 inches and roughen the top surface of the slab in the recessed area to a 1/4-inch magnitude.

F. Wall Design Requirements:

1. The prestressed concrete tank wall shall be constructed with a cast-in-place core wall that is circumferentially wrapped with seven-wire strand prestressing reinforcement at the exterior and encapsulated within protective shotcrete layers. The core wall is to be vertically prestressed with post-tensioned thread bars.

2. The thickness of the core wall shall not be less than 10 inches thick.

3. The minimum average vertical compressive axial prestress in the core wall provided by the vertical prestressing reinforcement shall be 200 psi after deduction for all losses.
a. Vertical prestressing reinforcement shall be spaced on average no greater than 50 inches on center or seven times the thickness of the core wall, whichever is less.

4. The minimum average circumferential residual prestress compression in the wall shall not be less than 200 psi for the aboveground portion of the tank wall, tapering linearly to 50 psi at 6 feet below grade.

5. The connection between the base of the wall and the foundation shall be an anchored flexible connection in accordance with Section 4.2.1 and Figure 4B of AWWA D110-13.
a. The joint at the base of the wall shall permit unrestrained radial expansion and contraction of the wall relative to the foundation. b. The joint at the base of the wall shall provide restraint against lateral seismic loads acting tangentially to the wall.
c. Restraint cables shall be provided between the core wall and the foundation to resist seismic loads. The cable installation shall be detailed in a manner that does not introduce radial restraint between the wall and the foundation.

6. The joint at the wall to the roof shall allow the roof to expand and contract radially while maintaining full vertical load bearing capacity under all conditions.

7. The minimum concrete cover over non-prestressed reinforcing shall be in accordance with Table 3.3.2.3 of ACI 350.5.

8. Vertical non-prestressed reinforcing:
a. Provide vertical non-prestressed reinforcing over the full height of the wall. b. The tensile stress shall be limited to a maximum of 18,000 psi.

Page 1828 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-12 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) c. Reinforcing size shall not exceed 3/4-inch in diameter. d. Reinforcing spacing shall not exceed 12 inches on center.

G. Flat Roof and Column Design Requirements:

1. The roof shall be a flat, cast-in-place concrete structure that spans in two directions.

2. The minimum thickness of the roof slab shall be 9 inches.

3. The roof slab shall be provided with drop panels at concrete column supports.

4. Columns shall be limited to a maximum spacing of as shown on the Drawings.

5. Columns shall be circular with a minimum diameter of 18 inches.

6. Columns shall be reinforced with spirals.

7. Minimum concrete cover over reinforcing steel shall be in accordance with Table 3.3.2.3 of ACI 350.5.

8. The reinforcing steel for the roof structure shall be sized in accordance with ACI 350 with the environmental durability factor, Sd, applied to limit flexural stress. Reinforcing steel shall be proportioned and distributed to control cracking for normal environmental exposure.

9. The effects of thermal expansion and contraction shall be accounted for in the design of the roof structure. Appurtenances and roof connections shall be detailed to limit restraint to thermal radial movement.

10. The Tank Contractor shall submit, for the Engineer's approval, a plan showing the roof configuration that includes construction joints. Construction joints shall incorporate a 6-inch PVC waterstop.

1.07 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Prestressing steel shall be adequately packaged for protection against corrosion and physical damage during shipping and storage.

B. Prestressing steel that has rusted or has otherwise sustained damage will be rejected.

C. Prestressing material and appurtenances delivered to project site: Store off ground on planks, supported by 4-by-4 timber. Cover with polyethylene sheeting or treated paper to prevent exposure to moisture.

1.08 PROJECT CONDITIONS
A. Environmental requirements:

1. Cold weather epoxy grouting of tendons:
a. In cold weather, and especially during frosts, take special precautions to avoid freezing of epoxy.
b. In event that grouting procedure cannot be postponed, keep wall temperature above freezing point with hot blankets or by other means acceptable to Engineer.

B. Site safety precautions:

1. Take every precaution to keep personnel and visitors outside the area of danger from breaking prestressing strands or bars.

2. At no time shall anyone stand in the line of stressed circumferential strand.

Page 1829 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-13 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

3. No work shall be performed by anyone, other than the prestressing crew within 100 feet of circumferential wrapping operation or vertical bar stressing operation.

4. Where access to the site by unauthorized persons cannot be controlled while prestressing work is in progress, or where property lines are less than 100 feet from the wrapping operation, erect protective fencing to prevent breaking strands from endangering such persons.

C. Welding:

1. Perform no welding to anchor plates after prestressing tendons have been assembled.

2. Do not use prestressing steel as ground for welding operations.

1.09 SEQUENCING AND SCHEDULING
A. Polyvinyl chloride waterstops:

1. Welding of polyvinyl chloride waterstops: Prior to installing waterstops in forms, demonstrate ability to weld acceptable joints in waterstops.

2. Quality of welded joints: Are to be subject to acceptance of the Engineer.

B. Restrictions on shotcrete operations:

1. Abrasive Blasting:
a. Do not commence prior to the completion date of curing period of tank corewall.
b. Do not commence until all form tie holes have been drypacked.

2. Wind conditions: Do not apply shotcrete under such strong wind conditions that considerable amount of cement and moisture is removed by wind from mortar spray between nozzle and surface on which shotcrete is applied.

3. Temperature requirements:
a. Peak temperature during day must be expected to rise to at least 55 degrees Fahrenheit.
b. Night temperature of first night after shotcrete application must not be expected to drop below 33 degrees Fahrenheit.

4. Cold weather conditions:
a. Application of shotcrete under cold weather conditions is solely at the Tank Contractor's risk.
b. Shotcrete may be applied in cold weather provided surfaces are not frozen.
c. Damage to shotcrete: Whenever rain or frost damages shotcrete which has not had chance to take set:
1) Remove and replace such shotcrete.
2) Remove damaged shotcrete before applying any new layers of shotcrete.
d. Type III Portland cement may be utilized for shotcrete for cold weather application.

C. Ultimate initial prestressing force for vertical thread bars: Do not apply until concrete compressive strength in walls reaches specified strength.

Page 1830 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-14 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) D. Wrapping of circumferential prestressing strands:

1. May start when core wall concrete has reached a compressive strength of 3,000 pounds per square inch and intermediate layers of shotcrete coats over prestressing strands has reached a compressive strength of 250 pounds per square inch or 12 hours after the shotcrete coat was applied, whichever is greater.

2. The compressive stress in the concrete due to wrapping shall not exceed 55 percent of f'c at any time.

E. Backfilling of tanks:

1. Do not backfill until and unless the Engineer has accepted leakage testing results and the concrete has reached specified strength.

1.10 GUARANTEE
A. The Tank Contractor shall guarantee the structure against defective materials or workmanship for a period of two years from the final date of completion. If any materials or workmanship prove to be defective within two years, those materials shall be replaced or repaired by the Tank Contractor at the expense of the Tank Contractor.

B. Access hatch (through-roof access) warranty:

1. Manufacturer is to warranty proper operation and against defects in material or workmanship for a period of 5 years.

PART 2 PRODUCTS

2.01 MATERIALS
A. General:

1. Materials of construction for the strand-wound prestressed concrete tank shall be selected by the Tank Contractor, subject to the limitations of this Section.

B. Concrete:

1. Concrete shall conform to Section 03300 - Cast-in-Place Concrete and ACI 301, except as modified herein.

2. Unless otherwise specified, all concrete for tank construction shall have a minimum 28-day compressive strength of 4,000 psi.

3. The concrete for the tank floor, footings, and pipe encasement shall conform to the following requirements.
a. Concrete shall not be air-entrained.
b. The coarse and fine aggregate shall meet the requirements of ASTM C33 and sized to meet member thickness and clearance requirements of ACI 350.
c. Superplasticizer and water-reducing admixtures shall be incorporated into the concrete for the floor slab and wall footing.

4. Proportioning for concrete shall be in accordance with ACI 301.

5. All concrete shall have a maximum water-soluble chloride ion concentration of

0.06 percent by weight of cement.

Page 1831 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-15 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

6. Cement shall conform to ASTM C 150, Type I or Type II.

7. Accelerating and retarding admixtures shall not be incorporated into the any concrete mix without prior acceptance by the Engineer.

C. Reinforcing Steel:

1. Reinforcing steel shall be new billet steel Grade 60 meeting the requirements of ASTM A 615.

2. Reinforcing steel that is to be welded shall be ASTM A 706, Grade 60.

3. Reinforcing steel shall be accurately fabricated and shall be free from loose rust, scale, and contaminants.

4. Reinforcing steel shall be accurately positioned on supports, spacers, hangers, or other reinforcement and shall be secured in place with wire ties or suitable clips. Rebar chair supports shall be provided in accordance with Section 03200 - Concrete Reinforcing.

D. Prestressing Materials:

1. Seven-wire strand:
a. Prestressing strand shall be in accordance with ASTM A 416 prior to hot-dip galvanizing.
b. Individually hot-dip galvanize each wire of strand before forming the wires into a strand.
c. Hot-dip galvanized 7-wire strand shall meet following minimum requirements:

Physical Characteristics Required Results
Nominal Strand Diameter Before Galvanizing 3/8 inch
Nominal Area After Galvanizing 0.089 square inch
Nominal Weight Per 1,000 Linear Feet 303 pounds
Pitch of Strand 12 to 16
Minimum Yield Strength At 1 Percent Extension 180,000 psi Minimum Ultimate Strength After Galvanizing 240,000 psi Elongation In 24 Inches At Fracture 4.5 percent
Weight Of Zinc Coating per ASTM A475 0.85 ounces per square foot

2. High strength thread bars:
a. Thread bars and deformations: Hot rolled.
1) Thread bars with cold rolled threads or with quenched or tempered steels will not be permitted.
b. Deformations of thread bars:
1) Provide deformations that form screw-thread suitable for mechanically coupling lengths of thread bar and provide positive attachment of anchor assemblies.
2) Provide deformations that are in accordance with ASTM A 722, Type II requirements and are uniform such that any length of bar may be cut at any point and internal threads of coupler designated for that size of bar can be freely screwed on bar.

Page 1832 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-16 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) c. Tensile and physical properties: Bars manufactured in accordance with ASTM A 722, Type II requirements are to comply with following minimum requirements:

Physical Characteristics Required Results
Nominal Diameter 1.25 inches or 1.375 inches
Nominal Cross-Sectional Area 1.245 square inches or

1.577 square inches
Nominal Bar Weight 4.39 pounds per foot or

5.56 pounds per foot
Minimum Tensile Stress 150 ksi
Minimum Yield Stress at 0.2 Percent Offset 120 ksi
Elongation At Rupture In Gauge Length of
20 Bar Diameters
4 percent minimum
Maximum Carbon Content of Bar 0.55 percent
d. Nuts: Minimum ultimate strength shall be 95 percent of minimum ultimate strength of thread bar.

3. Anchorages for vertical post-tensioned thread bars:
a. All post-tensioned prestressing shall be secured at the ends by means of approved permanent anchoring devices, which shall hold the prestressing steel at a force not less than 95 percent of the guaranteed minimum tensile strength of the prestressing steel.
b. The load from the vertical prestressing anchoring device shall be distributed to the concrete through steel bearing plates and shall not exceed the values specified by the Post-Tensioning Institute (PTI), Guide Specifications, Paragraph 3.1.7.
c. Fully-threaded anchor connections shall be used at both ends of the vertical prestressing bar, which shall incorporate a spherical-shaped bearing surface to match the conical surface in the bearing plate. d. Wedge anchors shall not be used for permanent anchor hardware.

4. Testing of Prestressing Material:
a. Provide mill certificates.
b. Prior to preparation of shop drawings and installation of vertical thread bars, provide proof that the thread bar anchorage system meets the requirements specified herein.
c. Before any prestressing operations may be started, the Tank Contractor shall calibrate all recording equipment at an approved testing laboratory to the satisfaction of the Engineer.
d. All continuous force readings for either the vertical or the circumferential prestressing operations shall be developed with electronic (or the substantial equivalent) force (strain gauge method) sensing transducers, all having a maximum nonlinearity error of +/- 0.5 percent and a maximum hysteresis error of +/- 0.25 percent.

Page 1833 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-17 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

5. Anchor pockets for vertical thread bars:
a. Consist of steel cans fabricated from steel tubing, hot-dip galvanized after cutting and subsequently welded to the top bearing plate. b. Provide adequate means for flushing of vertical ducts during concrete placement.

6. Ducts for vertical thread bars:
a. Duct enclosures shall be standard 1.25 inch or 1.375 inch diameter PVC pipe class 160 or class 200, respectively, unless otherwise specified on the Drawings.
b. Threaded hose connections shall be provided at the top of each duct for water flushing.
c. All ducts shall be provided with expandable valves to facilitate the injection of epoxy grout after prestressing.

7. Epoxy grout for vertical thread bars:
a. The vertical thread bar system shall offer complete two-part epoxy protection of the prestressing steel inside ducting and anchors. b. Portland cement grout will not be accepted.

E. Seismic Cables and Sleeves:

1. Seismic cables:
a. Hot-dipped galvanized seven-wire strand:
b. Prestressing strand shall be in accordance with ASTM A 416 prior to galvanizing and ASTM A 475 after galvanizing.
c. Individually hot-dip galvanize each wire of strand before forming the wires into a strand.
d. The galvanized strand shall have a minimum ultimate tensile strength of 240,000 psi.
e. The cables shall be installed to connect the wall and the foundation. f. The minimum weight of zinc galvanic coating shall be 0.85 ounces per square foot.
g. Only seven-wire strand will be allowed. Single wire will not be allowed.

2. Neoprene sleeves for seismic cables shall conform to SCE-43 of ASTM D 1056 and as further modified by the following:

Physical Characteristics Required Results
Compressive deflection 9 to 13 psi
Shore 00 durometer 60 to 80 pcf
Density 12 to 28 pcf
Water absorption by weight 5 percent
Temperature range: Low (flex without cracking)
High continuous
High intermittent
-40 degrees F
150 degrees F
250 degrees F
Compressive set (average): 1/2-inch sample
compressed at 50 percent for 22 hours at 70 degrees F
and 24 hour recovery
15 to 35 percent
Maximum linear shrinkage during heat aging (7 days at
158 degrees F)
5 percent

Page 1834 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-18 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) Physical Characteristics Required Results
Minimum tensile strength 175 psi
Minimum elongation 180 percent
Resilience (bayshore – percent rebound average
1/2-inch thickness at 72 degrees F)
20 to 40 percent
F. Shotcrete:

1. General:
a. Shotrcrete shall conform to ACI 506.2, except as modified herein. b. Minimum compressive strength of shotcrete shall be 4,500 psi at 28 days. c. Shotcrete used in the tank construction shall have a maximum water soluble chloride ion concentration of 0.06 percent by weight of cement. d. Rebound materials shall not be reused in any form for shotcrete

2. Portland cement shall meet the general requirements in Section 03300 - Cast-in-Place Concrete.

3. Fine aggregates:
a. Fine aggregates shall meet the requirements as specified in Section 03300 - Cast-in-Place Concrete and the following paragraphs. b. Coarse sand:
1) Shotcrete applications: Use well graded coarse sand, unless otherwise noted.
2) Gradations:

Sieve Size Percent Passing by Weight
3/8 inch 100
Number 4 95-100
Number 8 80-100
Number 16 50-85
Number 30 25-60
Number 50 10-30
Number 100 2-10
c. Fineness modulus shall be between 2.7 and 3.0.

4. Water shall be in accordance with Section 03300 - Cast-in-Place Concrete.

5. Class F fly ash shall conform to ASTM C618 and shall not make up more than 20 percent of the cementitious material in the shotcrete mix.

G. Elastomeric Materials:

1. Bearing pads shall be natural rubber or neoprene:
a. Natural rubber bearing pads shall contain only virgin natural polyisoprene as the raw polymer and the physical properties shall comply with ASTM D 2000 Line Call-Out M4AA414A13.
b. Neoprene bearing pads shall have a hardness of 40 to 50 durometer, a minimum tensile strength of 1,500 psi, a minimum elongation of 500 percent, and a maximum compressive set of 50 percent. Pads shall

Page 1835 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-19 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) meet the requirements of ASTM D 2000 Line Call-Out M2BC410 A14 B14 or 2 BC 415 A1 4 B14 for 40 durometer material.

2. Sponge filler shall be closed-cell neoprene or rubber conforming to ASTM D 1056, Type 2, Class A, and Grade 3. Compression deflection limited to 25 percent at two to five psi.

H. Waterstops:

1. Requirements:
a. Material: Polyvinyl chloride.
b. Size and type:
1) Centered at construction joints in cast-in-place concrete: 6-inch flat ribbed type.
2) At tank walls to tank wall-footing joints: 9-inch wide with 1-inch diameter hollow bulb ribbed type.
3) Type not allowed: Dumbbell type.
c. Physical characteristics:

Physical Characteristics Test Method Required Results
Specific Gravity ASTM D 792 Not less than 1.3
Hardness ASTM D 2240 70 to 90 Type A Shore
durometer
Tensile Strength ASTM D 638 Not less than 2,000 pounds per square inch
Ultimate Elongation ASTM D 638 Not less than 300 percent Alkali Extraction CRD C 572 7 day weight change between minus 0.1 percent and plus

0.25 percent. Hardness change
within 5 points.

Low Temperature Brittle
Point
ASTM D 746 No sign of cracking or chipping
at minus 35 degrees Fahrenheit
Water Absorption ASTM D 570 24 hours, not more than

0.15 percent
Accelerated Extraction
Tensile
CRD C 527 Not less than 1,600 pounds per
square inch
Stiffness in Flexure ASTM D 747 Not less than 600 pounds per square inch
Tear Resistance ASTM D 624 225 pounds per square inch
Weight Requirements
Thickness 3/8 inch
Center Bulb Outside
Diameter
1 inch nominal
Allowable Tolerances
Width Plus or minus 3/16 inch
Thickness Plus or minus 1/32 inch

Page 1836 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-20 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) d. Manufacturers: One of the following or equal:
1) Burke Concrete Accessories, Inc.
2) Greenstreak PVC Waterstops, Sika Corporation.
3) Kirkhill Rubber Company.
4) Williams Products, Inc.
5) Vinylex Corporation.

I. Tank Appurtenances:

1. General:
a. Provide and install all appurtenances as shown on the Drawings and as specified herein.

2. Piping:
a. Inlet: As indicated on the Drawings.
b. Outlet: As indicated on the Drawings,
c. Overflow piping and overflow cone: As indicated on the Drawings.

3. Pipe Supports:
a. Provide as required to adequately support piping under all load and operating conditions.
b. Refer to Section 15061 - Pipe Supports.

4. Ladders
a. Conforming to all requirements of OSHA and as indicated on the Drawings.
1) Provide brackets and fasteners required for support and secure mounting to tank structure.
2) Rungs: solid bar stock.
3) Welds: fillet or full penetration as appropriate to the condition. 4) Fasteners Ladder bolts, concrete anchors, nuts, washers, and flush steel inserts: Type 316 stainless steel.
b. Interior:
1) Materials: Type 304/304L stainless steel.
2) Fall protection: Fall arrest device as specified in the following paragraphs. Material to match that of ladder. Provide removable center rail extension projecting at least 48 inches above top rung of ladder.
c. Fall arrest device consisting of sliding/locking mechanism with safety belt and belt attachment to center climbing rail.
1) Device material: Type 304 stainless steel.
2) Devices: To include following items, all fabricated of device material unless otherwise accepted by the Engineer:
a) Rails: Lengths as required.
b) Brackets: Complete with brackets necessary for attaching rail to ladders.
c) Removable rail extension: 48-inch long.
3) Sleeve assemblies and safety belts: 2.
4) Manufacturers: The following or equal:
a) Norton Company, Air Space Device Division, Cerritos, CA, Saf-T-Climb with SAF-T-NOTCH RAIL and SAF-T-LOCK
SLEEVE.

5. Access hatches (through-roof access):
a. Sizes: Nominal size(s) as indicated on the Drawings.

Page 1837 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-21 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) b. Material and construction:
1) Door leaf/leaves: Aluminum diamond pattern plate with reinforcement if required for spans provided.
2) Frame: Minimum 1/4-inch thick, aluminum channel with anchor flange around perimeter.
3) Door hardware: Equip doors with following:
a) Hinges: Minimum 2 heavy forged stainless steel hinges and pins for each leaf.
b) Operators, hold-open and handle: Spring operators and automatic hold-open arm with release handle for each leaf. c) Lock: A Type 316 stainless steel snap lock with fixed handle shall be mounted on the underside of one cover. In addition, the lock shall be a cylinder style with a threaded security cover plug. d) Seals: Leaf seals shall be dust and water tight.
e) Drainage coupling: 1-1/2-inch coupling located in front right corner of frame. Drain shall be installed to drain to the exterior side of the tank, adjust curb height as required.
4) Finish: Manufacturer's standard mill finish.
5) Manufacturers: One of the following or equal:
a) Bilco Co., Type JD-AL.
b) Babcock-Davis Associates, Inc., Type AM or GT.
c) Nystrom, Inc.

6. Grating, Guardrail, and Miscellaneous Fabrications:
a. Refer to Section 05500 - Metal Fabrications.
b. Materials: As indicated on the Drawings.

7. Roof Ventilator:
a. Size: As required to meet the air flow design requirements, but not less than indicated on the Drawings.
b. Materials and construction:
1) Aluminum components.
2) Stainless steel anchors.
3) Flashing shall wrap over the edge of the concrete curb and extend down a minimum of 2 inches.
4) 2-inch aluminum filters.
5) Insect screens.
6) 12-inch tall base.
7) Fiberglass hood insulation.
c. Manufacturers: The following or equal:
1) Greenheck Fabra Hood.
d. Finish: Manufacturer’s standard mill finish.

8. Downspouts and conductor heads:
a. Minimum 22 gauge steel.
b. Galvanized in accordance with ASTM A 653 to G90 designation. c. Fastened to the tank wall with stainless steel anchors. d. Field painted. Color to be selected by Owner.

J. Form ties:

1. General: The requirements of this Section supplement the form ties requirements stated in Section 03102 - Concrete Formwork.

Page 1838 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-22 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

2. Requirements:
a. Form ties for forming system selected for concrete other than corewall:

Cone-snap tie or flat bar type with waterstops.
b. Form ties for forming system selected for tank corewall: Tapered ties.

K. Wall Forms: As specified in Section 03102 - Concrete Formwork, regular plywood forms may be used for forming of circular walls, as long as there are no straight sections longer than 36 inches at any place around the outside circumference of such walls.

1. Forms shall be designed to resist the construction loads for full height wall pours.

L. Polyethylene sheeting:

1. Minimum 6-mils thick and in accordance with ASTM C 171.

M. Granular leveling base:

1. Material shall meet the requirements for aggregate base course specified in Section 02050 - Soils and Aggregates for Earthwork.

N. Epoxy injection materials: As specified in Section 03931 - Epoxy Injection Systems and the following products:

1. Epoxy materials: Nontoxic to potable water.

2. Grout injection pipes: Provide with positive mechanical shutoff valves.

O. Materials for repair of chipped out concrete areas:

1. Epoxy bonding agent: As specified in Section 03071 - Epoxies.

2.02 SOURCE QUALITY CONTROL
A. Concrete testing:

1. As specified in Section 03300 - Cast-in-Place Concrete.

2.03 COMPLIANCE TESTING
A. Not used.

PART 3 EXECUTION

3.01 SUPERVISION
A. The Tank Contractor shall provide a full-time on-site project manager during all aspects of tank construction.

3.02 INSTALLATION
A. Waterstops:

1. General: The requirements of this Section supersede the waterstop requirements stated in Section 03150 - Concrete Accessories.

Page 1839 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-23 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

2. Requirements:
a. Install in concrete joints where indicated on the Drawings. b. Connect the ends of the radial waterstop in the wall footing joints to the circumferential waterstop in the wall to wall footing joint and to the circumferential waterstops in the floor to wall-footing joints if they should exist.
c. Provide waterstop in each joint in water-bearing structures, whether indicated on the Drawings or not.
d. Provide waterstops that are continuous.
e. Set accurately to position and line indicated on the Drawings. f. Hold and securely fix edges in position at intervals of not more than 12 inches and secure in manner that they cannot move during placing of concrete.
g. A hog-ring or nail may be driven through both ends of the waterstop to facilitate placing and tying of waterstops to reinforcing steel forms or form-ties.
h. Tank Contractor's option: One of the following:
1) Use waterstop tie wires at not more than 12 inches on centers, near outer ribs, to tie waterstops into position.
2) Use special clips.
i. Waterstop terminations: Terminate 3 inches from top of finished surfaces of walls and slabs unless otherwise specified or indicated on the Drawings.
j. Installation of waterstops:
1) Install so that joints are watertight.
2) Provide field welded polyvinyl chloride waterstop joints such as unions, crosses, ells, and tees.
3) Make all splices to waterstop in accordance with manufacturer's recommendations.
4) Clean waterstops of all concrete, dirt, and foreign matter.

B. Form and accessories removal:

1. General: The requirements of this Section supercede the form and accessories removal requirements stated in Section 03102 - Concrete Formwork.

2. Requirements:
a. Other forms supporting concrete and shoring: Remain in place as follows:
1) Sides of footings, sides of slabs, and columns: 24 hours minimum. 2) Core walls: 12 hours minimum.

C. Neoprene bearing pads:

1. General:
a. Secure bottom surface of pads by positive attachment to structure such that horizontal crawling is prevented.

D. Closed cell neoprene joint fillers and sleeves (“sponge filler”):

1. When joint filler pads or sponge filler sleeves are indicated on the Drawings or specified, place materials in correct position before concrete is placed against them.

2. Holes and joints in pads are to be filled with caulking to prevent passage of mortar or concrete from one side of the joint to the other.

Page 1840 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-24 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

3.03 FLOOR
A. Prior to placement of the floor reinforcing, a 6-mil polyethylene moisture barrier shall be placed over the leveling base material. Joints in the polyethylene shall be overlapped a minimum of six inches.

B. Prior to placement of the floor concrete, all piping that penetrates the floor shall be set and encased in concrete to the limits indicated on the Drawings. Provide waterstops at the joints between the encasement and the concrete floor slab where indicated on the Drawings.

C. The vertical waterstops between the wall and footing shall be placed and supported to locate the center bulb within the joint as indicated on the Drawings and as required by the Tank Contractor. The waterstop shall be spliced using a thermostatically controlled sealing iron and each splice shall be successfully spark tested prior to encasement in concrete.

D. The floor shall be poured without construction joints, except as otherwise allowed by the Engineer. There shall be no construction joints between the floor and wall footing.

3.04 CONCRETE
A. All concrete shall be conveyed, placed, finished, and cured as specified in Section 03300 - Cast-in-Place Concrete, except as modified herein.

B. Requirements:

1. Cold joints:
a. Cold joints in floors, roof slabs, and wall footings are not allowed. b. Continuously cover joints with new concrete, and thoroughly integrate through vibration, even if it means that horizontal passes of only 6 inches in width can be made until additional concrete and equipment becomes available to permit wider passes in concrete placement.

2. Blockouts or other types of wall openings: Do not provide openings other than those indicated on the Drawings.

C. Weather Limitations:

1. Unless specifically authorized in writing by the Engineer, concrete shall not be placed without special protection during cold weather when the ambient temperature is below 35 degrees Fahrenheit and when the concrete is likely to be subjected to freezing temperatures before initial set has occurred and the concrete strength has reached 500 psi. Concrete shall be protected in accordance with ACI 306.1. The temperature of the concrete shall be maintained in accordance with the requirements of ACI 301 and ACI 306.1. All methods and equipment for heating and for protecting concrete in place shall be subject to the approval of the Engineer.

2. During hot weather, concreting shall be in accordance with the requirements of ACI 305.1.

3. Placement of concrete during periods of low humidity (below 50 percent) shall be avoided when feasible and economically possible, particularly when large surface areas are to be finished. In any event, surfaces exposed to drying wind

Page 1841 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-25 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) shall be covered with polyethylene sheets immediately after finishing, or flooded with water, or shall be water cured continuously from the time the concrete has taken initial set. Curing compounds may be used in conjunction with water curing, provided they are compatible with coatings that may be applied later and if they are degradable.

D. Finishes:

1. Provide manufacturer’s standard finish unless otherwise noted.

2. Coordinate finishes and surface preparation with coatings indicated on the Drawings.

E. Curing:

1. Except where specified herein, concrete curing shall be as specified in Section 03300 - Cast-in-Place Concrete.

2. Requirements:
a. Any concrete surface that is designated to receive paint or upon which any material is to be bonded: No curing compound shall be used. b. Concrete designated to be painted: Water or plastic membrane cure. c. Tank core walls: Water curing.
d. Floor slab:
1) The floor shall be cured by flooding with water and shall remain saturated for a minimum of seven days after placement.
2) Alternatively, the floor slab may be cured with a sprayed-on curing compound and prepared as follows:
a) After the surface is dry to the touch, a 6-mil thick polyethylene sheet shall be carefully taped and sealed to the concrete surface and kept on such surface for as long as possible, but not less than 7 days, to minimize the loss of moisture trapped between the polyethylene sheet and the concrete.
b) Alternatively, heavy curing blankets may be used in lieu of the polyethylene sheet.
e. Roof slab: Water or plastic membrane cure.
f. Other concrete surfaces: Water curing.

F. Testing Cast-in-Place Concrete:

1. All concrete testing shall be in accordance with Section 03300 - Cast-in-Place Concrete, except as noted herein.

2. Testing shall be at the expense of the Tank Contractor, and shall be conducted by an independent testing agency approved by the Engineer.

3.05 SEISMIC CABLES
A. Requirements:

1. Provide seismic cables to connect wall and wall footing.

2. Quantity and spacing of seismic cables shall be as indicated on the Shop Drawings.

3. Where necessary, seismic cables shall be pre-bent before placing units in wall and wall footing.

4. Tie seismic cables to lower horizontal circumferential tie-bar for vertical prestress tendons as indicated on the Drawings.

5. In wall-footing, tie seismic cables to radial footing bars.

Page 1842 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-26 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

3.06 PRESTRESSING
A. Circumferential Prestressing Equipment:

1. The circumferential stressing system shall produce a continuously, electronically (or substantial equivalent) monitored permanent stress or force recording along its full length as it is being applied and the stress variation in any strand at any point around the circumference shall not be greater than +/- 1.5 percent of the ultimate strength of the steel. In addition to this recording, any system which deflects the tensioned prestressing material between the tensioning device and the wall after it has left the tensioning device, shall provide a similar continuously monitored stress or force record along its full length as it is being applied to the wall. These recordings shall show that either before or after deflection that the stress variation in the prestressing material at any point around the circumference shall not be greater than +/- 1.5 percent of the ultimate strength of the steel.

2. Due to prior instances of force measurement inaccuracies and the inherent problems associated with hand-held stressometers, no manually recorded force readings will be accepted. This requirement shall be strictly followed.

3. Any wrapping that does not meet the stress tolerances specified and/or cannot meet the requirements of above will not be accepted and will be removed at the expense of the Tank Contractor. The Tank Contractor is responsible for all costs associated with meeting the specified tolerances.

4. Since intermittent force applications can result in an unequal stress distribution around the wall (due to friction losses), the prestressing system shall be capable of applying a continuous wrapped force at any point around the circumference within the specified tolerances. Circumferential stressing systems based on jack-operated cable or rod-type tendons (such as those placed inside of ducts incorporated in the corewall or placed manually around the exterior of the corewall) will not be allowed.

5. Since wrapping systems which utilize single solid prestressing material will not provide the desired bond between the prestressing material and the shotcrete and since single solid prestressing material will not provide an adequate safety factor against failure, only machine wrapping systems which utilize seven-wire prestressing strandwrapping will be allowed.

B. Circumferential Prestressing Application:

1. All cracks in the core wall and floor slab shall be repaired as specified following the circumferential prestressing of the tank walls.

2. Wrapped strand shall be anchored to the wall at least once for every coil or reel.

3. Permanently anchoring one strand to a previously wrapped strand will not be permitted. Wrapped strand ends shall be joined by suitable splicing methods that shall develop 90 percent of the full strength of the strand.

4. Use of different alloys in the splicing material shall not be permitted.

5. The clear vertical spacing between any two wrapped strands shall be

1.5 strand diameters or 3/8-inch, whichever is larger. A 1/4-inch construction tolerance shall apply to strand spacing, as well as to this minimum spacing requirement.

6. All wrapped strand not meeting the spacing requirements shall be spread by approved methods or shall otherwise be removed.

Page 1843 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-27 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) C. Vertical Prestressing Equipment:

1. The Tank Contractor shall provide a continuously, electronically (or substantial equivalent), monitored permanent force elongation record from zero to full force at the final lock-off for all of the vertical prestressing work.

2. The ordinate of the permanent recording shall show the elongation in inches and the abscissa shall show the force in pounds or kips.

3. Manually recorded force and elongation readings will not be accepted.

4. The vertical prestressing machinery shall have automatic electronic tensioning cut-off devices or equivalent means to ensure that the specified force and elongation is not exceeded at any time during any thread bar stressing operation.

5. The force readings at the stressed bar ends, immediately after lock-off, for any stressing operation, on any thread bar, shall not fluctuate more than +/- 1.5 percent (of the minimum ultimate strength of the steel) from the desired average force setting.

6. The applied force, immediately after lock-off for the final stressing operation on any thread bar, shall be no less than 72 percent of the ultimate strength of the steel and the applied force before lock-off shall be no greater than 75 percent of the ultimate strength of the steel.

D. Vertical Prestressing Application:

1. All permanent anchor hardware shall have a ball-shaped threaded nut that can be screwed down on to a matching cone-shaped bearing surface in the bearing plate after the desired tension on the anchor hardware and/or prestressing steel has been applied.

2. The number and spacing of the thread bars shall not be altered under any condition.

3. High-strength thread bars shall be used for vertical prestressing.

4. All ducts shall be clean and free of water and deleterious materials that would impair bonding of the grout or interfere with grouting procedures.

5. Grout injection pipes shall be fitted with positive mechanical shutoff valves, which shall not be removed within the first 24 hours.

6. Grouting of thread bars shall begin at the lowest grout connection.

7. Each vertical thread bar duct shall be pumped until the entire nut at the top anchor has been covered with epoxy.

8. In cold weather, and especially during frosts, special precautions must be taken to avoid the freezing of grout. In the event that the grouting procedure cannot be postponed, the wall temperature must be kept above the freezing point with hot blankets or by other approved means.

9. Upon completion of the vertical stressing and grouting operation, all anchor pocket areas above the anchor nuts shall be dry packed with a 1 part cement to 2 parts sand mortar mix immediately after the epoxy coating on the inside can surface has become tacky, or alternatively, the metal can may be filled with concrete aggregates and epoxy.

10. The inside surfaces of any metal cans to be dry packed shall be coated with a 2 part epoxy. Dry packing shall not proceed until the epoxy coat has become tacky. The dry pack surface shall be finished flush with the adjoining concrete surface.

11. Damaged PVC tubing shall be replaced unless repairs are made and approved by the Engineer.

Page 1844 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-28 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

12. Vertical thread bar components shall be assembled off the ground and as detailed on the Shop Drawings. All vertical thread bars must be fully assembled before they are installed in the forms.

13. Vertical thread bars shall be accurately placed and fastened securely in place to reinforcing steel and form ties to prevent movement during placement of concrete.

14. All vertical thread bars must be flushed with water from the top immediately upon completion of the concrete vibrating operation. Water shall be introduced through a taped-off hole in the wooden lids on the anchor pockets and be permitted to drain through the bottom grout tube. Flushing shall not be accomplished by introducing water through the bottom connection. Should a thread bar duct not flush properly, the Engineer shall be notified immediately.

15. Cleaning of ducts with air only (not water), or removal of water with air from the bottom connection, will not be permitted.

16. Placing of vertical thread bars shall be done to proper locations, elevations, and alignments, with a maximum tolerance of plus or minus 1/4 inch.

17. All vertical thread bars shall be properly tied at the anchor plates and shall be tied with No. 4 bars at intervals of 24 inches or less between the anchor plates.

The maximum permissible misalignment of the anchor plate to the vertical thread bar is +/- 2.5 degrees.

18. Anchor plates must be installed at right angles to the thread bar alignment near the anchor. Anchor plates must be installed with long sides, aligned parallel with the wall forms and secured to prevent their rotation while concrete is placed.

19. Unless indicated otherwise on the Plans, the minimum concrete cover around steel anchor pockets and bearing plates shall be 1.5 inches.

20. The vertical clearance between bottom anchor plate and the waterstop at the base of the tank walls shall be no less than 2 inches nor more than 4 inches.

E. Circumferential and Vertical Prestressing Operations:

1. The maximum initial electronically recorded steel stress shall not exceed 75 percent of the guaranteed minimum ultimate strength of the steel at any time during or after stressing.

2. An automatic, continuously electronically (or substantial equivalent) monitored permanent recording of the applied force, at any point on the strand, at any point on and around the tank wall, must be made during the entire circumferential prestressing application. All such recordings must be based on a continuous sensing of the applied force on the strand between the tensioning drum and the wall when, and as, the strand is being wrapped and laid on the wall.

3. The force setting on wrapping and vertical thread bar stressing machinery shall be such that the applied forces fall within the specified minimum or maximum stress or force limitations; the force setting shall be corrected immediately when the applied force falls outside the required force tolerance limitations.

4. In the event that the stressing machinery is incapable of holding the applied forces within the specified stress or force limitations, the Engineer will order, at the expense of the Tank Contractor, the removal and replacement of such machinery in favor of a different unit capable of maintaining such tolerance requirements.

Page 1845 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-29 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

5. The loss in stress in post-tensioned prestressing steel due to creep and shrinkage of concrete and sequence stressing is to be assumed as 25,000 psi.

The final stress is the average initial stress reduced by the stress loss of 25,000 psi.

6. The final force is the steel section multiplied by the final stress.

7. The final force for the vertical thread bars shall be no less than the required final force shown on the Shop Drawings.

8. The initial force for the circumferential wrapped strand shall be no less than the required initial force shown on the Shop Drawings.

9. The continuous, electronically-produced force application chart during the wrapping application becomes the property of the Owner.

10. An automatic, continuously electronically (or substantial equivalent) monitored and simultaneously recorded force-elongation reading must be made for each vertical stressing application.

11. The force-elongation reading must represent the true relationship between the elongation at any given point of the vertical stressing operation and the applied force on the prestressing steel at that same point.

12. The force-elongation relationship must be constantly maintained from the beginning, starting with the removal of the slack to the point of lock-off and complete release of the force on the vertical prestressing steel after retraction of the stressing piston or equivalent stressing device.

13. All electronically produced force-elongation readings during the vertical thread bar stressing operations become the property of the Owner.

14. After the concrete core wall has reached the specified 28-day compressive strength, the vertical thread bars shall be stressed.

15. Circumferential wrapping shall not start until the vertical thread bars have been stressed.

16. In the event gaps between concrete core wall and wrapped strand develop that exceed 3/8 inch, discontinue wrapping. Before resuming any wrapping, either:
a. Build-up walls with shotcrete to provide proper curvature before resuming any wrapping.
b. If acceptable to Engineer, drypack gaps after wrapping is completed and before shotcreting is started.

17. Wrapping over intermediate shotcrete coats or built-up shotcrete areas may commence 12 hours after shotcrete has been applied, or when the shotcrete has reached a strength of 250 psi, whichever duration is longest.

18. Prestressing strand exposed to excessive temperatures greatly increases the possibility of irrevocable damage to the strand such as steel embrittlement, stress corrosion, and strand splitting. The temperature of the prestressed strand during wrapping shall not be allowed to increase by more than 50 degrees at any time during application due to stressing technique.

19. All vertical thread bar ducting and anchors (both vertical and circumferential prestressing) shall be pressure grouted with an approved 2 part water insensitive epoxy and approved epoxy grouting equipment.

3.07 SHOTCRETING
A. Shotcrete Equipment:

1. Shotcrete mixing shall be in conformance with the requirements of Section 03300 - Cast-in-Place Concrete.

Page 1846 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-30 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

2. The delivery equipment shall be of an approved design and size that has given satisfactory results in similar previous work.

3. The equipment must be capable of discharging mixed materials into the hose under close control and it must be able to deliver a continuous smooth stream of uniformly mixed material at the proper velocity to the discharge nozzle, free from slugs of any kind.

4. The nozzle shall be of a design and size that will insure a smooth and uninterrupted flow of materials.

5. Delivery equipment shall be thoroughly cleaned at the end of each shift.

6. Equipment parts shall be regularly inspected and replaced as required.

7. The capacity of the compressor shall be large enough that the minimum amount of air to be available at the nozzle shall be no less than 400 cfm, irrespective of whether or not air from the same air supply is used for other purposes.

B. Placement and Testing of Shotcrete:

1. Shotcrete shall be applied by an ACI 506 certified nozzleman.

2. Manually applied shotcrete shall be applied with the nozzle held at a small upward angle not exceeding five degrees and constantly moving during application in a smooth motion with the nozzle pointing in a radial direction toward the center of the tank. The nozzle distance from the prestressing shall be such that shotcrete does not build up or cover the front face of the wire or strand until the spaces behind and between the prestressing elements are filled.

3. Unless applied by an automated shotcrete process, total cover coat thickness shall be controlled by shooting guide wires. Vertical wires shall be installed under tension and spaced no more than two feet apart to establish uniform and correct coating thickness. Monofilament line (100 lb. test) or 18 or 20 gauge high tensile strength steel wire shall be used. Guide wires shall be removed after placement of the cover coat.

4. Shotcrete applied by an automated shotcrete process shall be applied using the wet mix only. Nozzles shall be kept mounted on power driven machinery enabling the nozzle to travel parallel to the surface to be sprayed at a uniform linear or bi-directional speed. The nozzle shall be kept at a uniform constant distance from the surface, always maintaining a right angle spray of the material to the surface. The high velocity impact shall be developed pneumatically by injecting compressed air at the nozzle.

5. Testing:
a. Testing shall be by an independent testing laboratory, acceptable to Engineer, and engaged by and at the expense of the Tank Contractor. b. Test shotcrete in accordance with ACI 506, except as specified herein.

One test panel shall be made for each of the following operations: core wall, cove, wire cover, and cover coat. Test panels shall be made from the shotcrete as it is being placed, and shall, as nearly as possible, represent the material being applied. The method of making a test sample shall be as follows: A frame of wire fabric (one foot square, three inches in depth) shall be secured to a plywood panel and hung or placed in the location where shotcrete is being placed. This form shall be filled in layers simultaneously with the nearby application. After 24 hours, the fabric and

Page 1847 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-31 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) plywood backup shall be removed and the sample slab placed in a safe location at the site.
c. The sample slab shall be moist cured in a manner identical to that used for the regular surface application. The sample slab shall be sent to the testing laboratory. Nine three-inch cubes shall be cut from the sample slab and subjected to compression tests in accordance with current ASTM Standards. Three cubes shall be tested at the age of 7 days, three shall be tested at the age of 28 days, and three shall be retained as spares.

C. Shotcrete Placing and Finishing:

1. Shotcrete shall be applied in a steady, uninterrupted flow. Should the flow become intermittent for any cause, the machine operator shall direct the nozzle away from the work until it again becomes constant, or shut off the flow of materials.

2. The nozzle shall be held at approximately right angles to the surface and shall be kept at the proper and the same distance from the surface dictated by good practice standards for the type of application, type of nozzle and air pressure employed.

3. Sufficient time shall be allowed for each layer of shotcrete to set up so it may take the next layer without sagging.

4. The shotcrete shall be started at the bottom of the wall until all wrapped strand has been covered. Subsequent shotcrete layers may be applied from the top down or from the bottom up at the discretion of the Tank Contractor.

5. While the nozzle travels around the wall, the nozzle shall be raised or lowered at a uniform rate in such a manner that an adequate overlapping of coatings and a uniform finish will develop.

6. The nozzle shall be spiraled up or down around the tank to either the top or the bottom of the wall or to the termination of the intermediate strand layer.

7. To ensure proper penetration around the strand and proper conveyance of the material through the hose, a 5 to 7-inch slump of the mortar at the pump is recommended.

8. The application of the shotcrete in the number and thickness of layers specified herein is mandatory for proper penetration of shotcrete behind prestressing material and to reduce shrinkage due to more uniform in-depth drying of the shotcrete.

9. Each layer of wrapped prestressing steel shall be covered with shotcrete until a minimum clear cover of 3/8-inch or the diameter of the strand, whichever is greater, has been placed over the prestressing steel.

10. The final cover coat, to make up for the full thickness of shotcrete over the final strand layer, shall be applied in at least 3 layers of equal thickness.

11. Each layer of shotcrete shall be completed for the full circumference of the tank and substantially the full height of that layer before the next layer of shotcrete may be applied.

12. All shotcrete coatings shall be built up in layers of approximately 3/8-inch in thickness until the final required thickness has been obtained. The Tank Contractor shall demonstrate by a reliable means that the proper thickness of shotcrete has been obtained with each layer applied.

13. Unless otherwise specified on the Drawings, the minimum shotcrete cover over all wrapped steel shall not be less than the following:
a. For shotcrete in contact with soil: 2 inches.
b. For other shotcrete exposures: 1.5 inches.

Page 1848 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-32 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

14. The Tank Contractor shall make provisions to protect adjacent structures, equipment, vehicles, etc., from being damaged by overshooting shotcrete and rebound materials. Overshot shotcrete deposited onto the roof slab shall be removed before it adheres to the concrete surface.

15. After the minimum shotcrete cover specified over the wrapped prestressing strand has been completed by the automated shotcrete procedure, and if such finish requirements are shown on the Drawings, the exterior surface shall be given an acceptable float finish true to line and curvature and to details shown on the Drawings.

16. If a float finish is required on the Drawings, plaster or hand-applied shotcrete may be used to build up and level the surface and to obtain the desired surface finish and projections.

17. The finish coat mix (if a smooth float finish is required on the Drawings), shall consist of a minimum of one sack of cement for each 3-1/2 cubic feet of moist plaster sand.

18. The Tank Contractor shall be responsible for all damages caused by shotcreting operations and shall bare the cost for making repairs.

D. Hand Placed Shotcrete for Repairs Only:

1. To ensure a high quality shotcrete, the Tank Contractor shall satisfy the Engineer that the nozzleman has had sufficient and acceptable experience in the application of structural shotcrete and is a certified nozzleman in accordance with ACI 506.

2. Experience gained on shotcrete pool and ditch construction will not be considered as experience for qualifying the nozzleman.

3. The nozzleman shall be capable of applying thin coats of even and uniform thickness.

4. The nozzleman's skill shall be tested and the results of such tests shall be acceptable to the Engineer before that nozzleman may start any work.

E. Restrictions on Shotcrete Operation:

1. Shotcrete shall not be applied under such strong wind conditions that a considerable amount of cement and moisture will be removed by the wind from the mortar spray between the nozzle and the surface on which the shotcrete is applied.

2. Shotcrete may be applied in cold weather provided the surfaces are not frozen.

3. The temperature during the day must be expected to rise to at least 40 degrees F and the night temperature of the first night after the shotcrete application must not be expected to drop below 27 degrees F.

4. The use of Type 3 Portland cement is required (when readily available) in the event shotcrete is applied at temperatures below 40 degrees F.

5. The Tank Contractor may apply shotcrete under the conditions specified herein solely at his own risk.

6. Whenever rain or frost has damaged shotcrete which has not had a chance to set up, such shotcrete must be removed and replaced.

7. The Tank Contractor shall consult with the Engineer to determine whether or not he will accept the shotcrete damaged by rain or frost before applying any new layers of shotcrete.

Page 1849 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-33 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal) F. Shotcrete Curing:

1. Intermediate layers of shotcrete shall be kept damp by hand curing or other means no sooner than 12 hours after the shotcrete has been applied.

2. Watercuring is not required should additional shotcrete be applied on the entire wall surface within the following 12 hours.

3. Indiscriminate use of continuous watercure for intermediate layers should be avoided.

4. Complete shotcrete surfaces, which do not receive any additional shotcrete coatings, shall be membrane cured with plastic for a period of at least seven (7) days. Plastic membrane used shall contain and prevent loss of moisture from shotcrete as much as possible. Membrane curing methods utilizing curing compounds or wax-based residuals will not be permitted.

5. Wall coatings, specified in Section 09986 - Painting Prestressed Concrete Water Tanks, shall be applied no later than five (5) days after completion of the curing. If conditions make it impossible to apply coatings within the five (5) day period, or if no coatings are required, shotcrete shall be membrane cured for a period of ten (10) days instead of the seven (7) days specified here-in.

3.08 CLEANING
A. After construction is completed, the interior of the tank shall be completely cleaned of debris and flushed with clean water to remove all dirt and loose material.

3.09 DISINFECTING
A. Not Used.

3.10 FILLING AND WATERTIGHTNESS TESTING
A. Filling:

1. The water used for the first filling of the tank will be furnished by the Owner. If the leakage test fails, the Tank Contractor shall refill the tank and retest it. The Tank Contractor shall be responsible for the cost of refilling the tank for subsequent tests.

2. The tank shall be filled in approximately 8-foot increments with 8 working hours between each increment for observation of possible leaks through ring drains, wall, and wall-footing.

B. Testing:

1. If only damp spots and small puddles of water are observed during filling, the filling of tank can continue. If leaks that are large enough to potentially fail the leakage test specified in Section 01759 - Water Leakage Test for Concrete Structures are observed, the filling process shall cease, and those leaks shall be thoroughly investigated prior to continuing to fill the tank.

2. Fill tank with water and hold water level at 3 inches below the overflow level for a period of 24 hours.

3. Test tank for leakage in accordance with the provisions of Section 01759 - Water Leakage Test for Concrete Structures.

Page 1850 of 3073 ends

Strand-Wound Circular Prestressed Concrete Tank With a Type I Core Wall and Flat Roof 13207-34 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13207 (BidSetFinal)

4. Examine the tank and soil at the perimeter of the tank footings for evidence of leaks.
a. Acceptance criteria shall be as specified in Section 01759 - Water Leakage Test for Concrete Structures .

C. Repairing tank leaks:

1. Repair leaks to satisfaction of the Engineer.

2. Any areas that, in opinion of the Engineer, are exposed to contamination during repair work shall be sprayed with disinfection water mix.

3. Leakage through joints, which may have resulted from bent over waterstops or honeycomb under or around waterstops, may require removal of concrete around waterstops in suspected areas.

4. Repair of chipped out concrete areas:
a. Coat chipped out concrete surface with epoxy bonding agent. b. Properly drypack with drypack mix for repair of concrete tank areas.

5. Any cracks, voids, honeycomb, or cold joints showing or causing running leaks of water, shall be repaired by epoxy injection as specified in Section 03931 - Epoxy Injection System until such cracks and voids have been completely sealed.

END OF SECTION

Page 1851 of 3073 ends

Manual Actuators
13446-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal) SECTION 13446

MANUAL ACTUATORS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Valve and gate actuators.

2. Handwheel actuators.

3. Hand-cranked geared actuators.

4. Floor Boxes.

5. Floor stands.

6. Key operated valves.

7. Bench stands.

8. Accessory equipment and floor boxes.

1.02 REFERENCES
A. Aluminum Association (AA):

1. DAF-45 - Designation System for Aluminum Finishes.

B. American Water Works Association (AWWA).

C. National Electrical Manufacturers Association (NEMA):

1. 250 - Enclosures for Electrical Equipment (1000 V Maximum).

D. National Electrical Code (NEC).

1.03 SUBMITTALS
A. Shop drawings: Include shop drawings and product data with associated gate or valve as an integrated unit.

1.04 QUALITY ASSURANCE
A. Provide valve actuators integral with valve or gate, except for valve actuators utilizing T-wrenches or keys, and portable gate actuators intended to operate more than 1 valve.

B. Provide similar actuators by 1 manufacturer.

C. Provide gates and hand operating lifts by 1 manufacturer.

D. Provide hydraulic gate lifts by 1 manufacturer.

E. Provide hydraulic valve actuators and motorized actuators by 1 manufacturer.

Page 1852 of 3073 ends

Manual Actuators
13446-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal)

1.05 MAINTENANCE
A. Extra materials:

1. Key operated valve keys or wrenches: Furnish a minimum 4 keys with 4-foot shafts and 3-foot pipe handles or wrenches with 4-foot shafts and 3-foot handles for operating key operated valves.

PART 2 PRODUCTS

2.01 VALVE AND GATE ACTUATORS
A. Valve actuators:

1. Manual actuators:
a. Material: Type 316 stainless steel.
b. Design: Hand lever.
c. Spring release handle: 12-inch.
d. Notch plate: 10 position.
e. Secure with mounting bolts.
f. Locking device so that valve can be locked in any position with a wing nut.

2. Stem and cover:
a. For submerged valves, provide extension stem as indicated on the Drawings.

B. Stem covers:

1. Aluminum pipe:
a. Threaded cap on top.
b. Bolted aluminum flange on bottom.
c. Slots cut 1- by 12-inch at 18 inches on center in front and back of pipe. d. Capable of covering threaded portion of greased stems that project above actuators when gates or valves are opened or closed.

2. Ultraviolet light resistant, clear butyrate plastic or polycarbonate pipe:
a. Capped on the upper end.
b. Either threaded into the top of the gate operators or held in place by bolt-down aluminum brackets.
c. Capable of covering threaded portion of greased stems that project above actuators when gates or valves are opened or closed.

3. Staff gauges:
a. Adhesive-backed mylar, suitable for outdoor service. b. Calibrated in hundredths of feet.
c. Read the weir crest elevations directly.
d. Gauge range: 1.5 feet minimum.
e. Indicate the following elevations on each staff gauge:
1) -0.75, -0.50, -0.25, 0.0, 0.25, 0.50, 0.75.
f. Supplement with a stem-mounted pointer or indicator that permits direct observation of the weir gate crest elevation.
g. Apply staff gauges to each stem cover after installation of the cover and after calibration and testing of the weir gates.
h. Set gauges precisely by a survey crew using instruments acceptable to the Engineer.

Page 1853 of 3073 ends

Manual Actuators
13446-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal) C. Stem cover flanges, pipes, and caps:

1. After fabrication, etch and anodize to produce the following chemical finishes in accordance with AA publication DAF-45:
a. A 41 - Clear Anodic Coating.
b. C 22 - Medium Matte Finish.

D. Gate stem covers: Concentric with stem.

E. Position indicators:

1. For all aboveground worm gear or traveling nut manual actuators, provide position indication on the actuator enclosure.

2. Tail rods on hydraulic cylinders, or dial indicators with clear full-open and closed position indicators, calibrated in number of turns or percentage of opening.

F. Manual or power actuator size:

1. Sized to deliver maximum force required under most severe specified operating condition, including static and dynamic forces, seat and wedge friction, and seating and unseating forces with safety factor of 5, unless otherwise specified.

G. Actuator size: Capable of supporting weight of suspended shafting unless carried by bottom thrust bearings; shaft guides with wall mounting brackets.

H. Provisions for alternate operation: Where specified or indicated on the Drawings, position and equip crank or handwheel operated geared valve actuators or lifts for alternate operation with tripod mounted portable gate actuators.

I. Operation: Counterclockwise to open with suitable and adequate stops, capable of resisting at least twice normal operating force to prevent overrun of valve or gate in open or closed position.

J. Open direction indicator: Cast arrow and legend indicating direction to rotate actuator on handwheel, chain wheel rim, crank, or other prominent place.

K. Buried actuator housing: Oil and watertight, specifically designed for buried service, factory packed with suitable grease, completely enclosed space between actuator housing and valve body so that no moving parts are exposed to soil; provide actuators with 2-inch square AWWA operating nut.

L. Worm gear actuators: Provide gearing on worm gear actuators that is self-locking with gear ratio such that torque in excess of 160 foot-pounds will not need to be applied to operate valve at most adverse conditions for which valve is designed.

M. Traveling nut actuators: Capable of requiring maximum 100 foot-pounds of torque when operating valve under most adverse condition; limit stops on input shaft of manual actuators for fully open and closed positions; non-moving vertical axis of operating nut when opening or closing valve.

Page 1854 of 3073 ends

Manual Actuators
13446-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal)

2.02 HANDWHEEL ACTUATORS
A. Manufacturers: One of the following or equal:

1. Rodney Hunt Co.

2. Waterman Industries, Inc.

B. Coating: Handwheel as specified in Section 09960 - High-Performance Coatings.

C. Mounting: Floor stand or bench stand. Unless otherwise indicated on the Drawings position actuator 36 inches (nominal) above top of walkway surface.

D. Bearings above and below finished threaded bronze operating nut: Ball or roller.

E. Wheel diameter: Minimum 24 inches.

F. Indicator: Counterclockwise opening with arrow, and word OPEN cast on top of handwheel indicating direction for opening.

G. Pull to operate: Maximum 40 pounds pull at most adverse design condition.

H. Stem travel limiting device: Setscrew locked stop nuts above and below lift nut.

I. Grease fittings: Suitable for lubrication of bearings.

2.03 HAND-CRANKED GEARED ACTUATORS
A. Type: Single removable crank; fully enclosed.

B. Mounting: Floor and bench stand. Unless otherwise indicated on the Drawings position actuator 36 inches (nominal) above top of walkway surface.

C. Operating nut: When scheduled for portable gate actuators.

D. Geared lifts: Single speed with minimum ratio of 2 to 1.

E. Teeth on gears, spur pinions, bevel gears, and bevel pinions: Cut.

F. Lift nuts: Cast manganese bronze.

G. Exterior surfaces on cast-iron lift parts: Smooth.

H. Bearings above and below flange on lift nuts: Ball or roller; capable of taking thrust developed by opening and closing of gates under maximum operating head; with bronze sleeve bearings and sufficient grease fittings for lubrication of moving parts, including bearings and gears.

I. Crank rotation indicator: Cast arrow with word OPEN in prominent location readily visible indicating correct rotation of crank to open gate.

J. Hand cranks: 15-inch radius; requiring maximum 25 pounds pull to operate gate at maximum operating head; with:

1. Revolving brass sleeves.

Page 1855 of 3073 ends

Manual Actuators
13446-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal)

2. Gears, spur pinions, bevel gears, and bevel pinions with cut teeth.

3. Cast manganese bronze lift nuts.

4. Cast-iron lift parts with smooth exterior surfaces.

K. Indicator: Dial position type mounted on gear actuator; enclosed in cast-iron or aluminum housing with clear plastic cover; marked with fully open, 3/4, 1/2, 1/4, and closed positions.

2.04 FLOOR BOXES
A. Manufacturers: The following or equal:

1. Waterman Industries, Inc.

B. Floor boxes: Cast-iron; with:

1. Counter type indicator.

2. Hinged, lockable lid with directional arrow.

3. 2-inch square AWWA operating nut.

4. Packing gland providing drip-tight seal around valve shaft.

2.05 FLOOR STAND
A. Manufacturers: One of the following or equal:

1. Rodney Hunt Co.

2. Waterman Industries, Inc.

B. Floor stand assemblies: Heavy-duty cast-iron, suitable for mounting specified actuator.

2.06 BENCH STANDS
A. Manufacturers: One of the following or equal:

1. Rodney Hunt Co.

2. Waterman Industries, Inc.

B. Bench stands: Handwheel actuators or hand crank, geared actuators conforming to hand-cranked geared actuator requirements, except capacity to be mounted on haunch, wall bracket, or self-contained gate yoke.

2.07 ACCESSORY EQUIPMENT
A. Wall brackets or haunches: As indicated on the Drawings.

B. Stems: Stainless steel; sized to match output of actuator; minimum gate or valve operating stem diameter; maximum 200 slenderness ratio.

C. Stem couplings: Stainless steel; internally threaded to match stem; lockable to stem by set screw.

D. Stem guides: Cast-iron with silicon bronze bushing; maximum 200 slenderness ratio; capable of being mounted with wall bracket; adjustable in 2 directions.

Page 1856 of 3073 ends

Manual Actuators
13446-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13446 (BidSetFinal) E. Wall brackets: Cast-iron, capable of withstanding output of actuator, adjustable in 2 directions.

F. Stem stuffing boxes: Cast-iron, with adjustable gland and packing.

G. Fasteners: Type 316 stainless steel.

H. Anchor bolts: As specified in Section 05190 - Mechanical Anchoring and Fastening to Concrete and Masonry except that the material shall be Type 316 stainless steel.

I. Geared valve actuators: Provided with cut gears, either spur or worm; sized to operate valves at most adverse design condition; with maximum 40-pound pull at handwheel or chain wheel rim.

J. Geared valve traveling nut actuators: Acceptable only where specified or indicated on the Drawings.

K. Accessory equipment for valves and gates requiring remote actuators: Operating stems, stem couplings, stem guides, wall brackets, and stem stuffing boxes.

PART 3 EXECUTION

3.01 INSTALLATION
A. Install floor boxes in concrete floor with lid flush with floor.

B. After installation of gate and stem covers, mark stem covers at point where top of stems are at full-open position and at closed position.

C. Attach floor stand to structure with anchor bolts.

D. Install stem stuffing boxes where operating stems pass through intermediate concrete floor slabs.

3.02 SCHEDULES
A. Geared actuators: Provide geared actuators for following valves:

1. Butterfly valves larger than 6 inches, nominal size, on liquid service.

2. Butterfly valves larger than 10 inches, nominal size, on gas and air service.

3. Plug valves 6 inches, nominal size, and larger.

B. Handwheel actuators: Provide handwheel actuators for valves mounted 6 feet or less above floors.

C. Chain wheel actuators: Provide chain wheel actuators for valves mounted more than 6 feet to centerline above floors.

END OF SECTION

Page 1857 of 3073 ends

Electric Actuators
13447-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) SECTION 13447

ELECTRIC ACTUATORS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Electric motor-driven actuators for valves and gates.

1.02 REFERENCES
A. American Water Works Association (AWWA):

1. C504 - Standard for Rubber-Seated Butterfly Valves.

2. C542 - Standard for Electric Motor Actuators for Valves and Slide Gates.

B. National Electrical Manufacturers Association (NEMA):

1. 250 - Enclosures for Electrical Equipment (1000 V Maximum).

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures and Section 15050 - Common Work Results for Mechanical Equipment.

B. Provide a complete list/schedule of all actuators being provided with their associated tag names as indicated on the design drawings and/or specifications, service process area and the size of the valve they are actuating.

C. Product data:

1. Electrical ratings:
a. Voltage and number of phases.
b. Starting and running current.
c. Voltage levels and source for control and status.

2. Description of integral control interface.

3. Remote control station components (If applicable).

4. Environmental ratings, including NEMA enclosure rating and submergence capabilities.

5. Gear ratios for both manual and motorized actuation.

6. Opening and closing directions.

7. Allowable starts per hour.

8. List of all included options and accessories.

9. Full travel times.

10. Gearbox data including gear ratio, and gearbox efficiency.

D. Shop drawings:

1. Wiring diagrams:
a. Include all options and expansion cards furnished with each actuator.

2. Dimensioned drawings of each valve and actuator combination.

Page 1858 of 3073 ends

Electric Actuators
13447-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal)

3. Dimensioned drawings of each valve gearbox.

4. Electric motor data.

E. Calculations:

1. Operating torque.

2. Maximum torque calculations for seating and unseating.

3. Maximum operating torque at starting and normal operation.

4. Signed by Professional Engineer licensed in the State where project is located.

F. Provide draft vendor operation and maintenance manual as specified in Section 01782 - Operation and Maintenance Manuals:

1. Include a list of all configurable parameters, and the final values for each.

2. Include a troubleshooting chart covering the complete valve and controls/electrical power systems, showing description of trouble, probable cause, and suggested remedy.

G. Commissioning submittals:

1. Provide Manufacturer’s Certificate of Source Testing as specified in Section 01756 - Commissioning.
a. Affidavit in accordance with AWWA C542.

2. Provide Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.

H. Project closeout documents:

1. Provide final vendor operation and maintenance manual as specified in Section 01782 - Operation and Maintenance Manuals.

1.04 WARRANTY
A. Provide warranty as specified in Section 01783 - Warranties and Bonds.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Manufacturer for actuators on valves FV-60100 and FV-60102:

1. The following, no equal:
a. Bray, Series 70.

B. Manufacturers for actuators on other valves:

1. The following or equal:
a. Rotork Controls Inc. IQ3 Range:
1) IQ for multi-turn applications.
2) IQT for quarter-turn applications.
b. Limitorque Corp.:
1) Accutronix MX for multi-turn applications.
2) Accutronix QX quarter-turn applications.

Page 1859 of 3073 ends

Electric Actuators
13447-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) C. Linear actuators:

1. The following or equal:
a. Rotork Controls Inc.:
1) CML Series.

2. As required to actuate the waste gates for the advanced water treatment (AWT) clarifier/filter units. Refer to Specification Section 11802 - Packaged Water Treatment System Rehabilitation.

2.02 CHARACTERISTICS FOR ACTUATORS ON LINES 4 INCHES AND LARGER A. Provide actuators complete and operable with all components and accessories required for operation.

B. Power supply:

1. Voltage and phases as indicated in the Motorized Actuator Schedule.

2. Valve or gate motion independent of power supply phase rotation.

3. Provide an internal backup power source or mechanical indicator to maintain settings and track valve position when main power is off.

4. The actuators shall incorporate all major components such as the motor, starter, local controls, terminals, etc. housed within a self-contained, sealed enclosure.

C. Size actuator to move gates or valves from full open to closed position within the time indicated in the Motorized Actuator Schedule:

1. If an operating time is not indicated on the Motorized Actuator Schedule, size the actuator to move gates or valves at minimum 12 inches per minute under maximum load. Measure rate of closure for valves at maximum diameter of disc, plug, or ball.

2. Size actuators so that gear boxes are not required where possible.

D. Control interface:

1. Configuration:
a. Provide a non-intrusive, non-contacting interface for configuring all input and output settings, control values, ranges, torque switch settings, valve positions switch settings, and options.
1) Configurable from a handheld configuring tool or input devices on the actuator.

2. Local interface, integral to actuator:
a. Non-intrusive, non-contacting selector switches:
1) LOCAL-STOP-REMOTE:
a) Motor actuator operation is prevented with the switch in STOP. 2) OPEN-CLOSE:
a) Controls the valve when LOCAL-STOP-REMOTE is in LOCAL. b) Spring return to center.
c) Configurable between maintained (actuator runs until end of travel, high torque, or a LOCAL-STOP-REMOTE is switched to STOP) and momentary (actuator stops when lever is released). b. Local display:
1) Valve fully open and fully closed indicators.
2) Numerical display showing actual valve or gate position in percent of travel.

Page 1860 of 3073 ends

Electric Actuators
13447-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal)

3. Remote control station - (VCP):
a. Provide remote control stations for all actuators located more than 5 feet above finished floor/grade or where indicated on the Drawings in the Schedule.
1) NEMA rating to match those to the associated Actuator Schedule. a) Where the rating is not listed, use NEMA Type 4X enclosures for non-hazardous areas, and explosion-proof (XP) Class I
Division 1 for hazardous areas.
b) All pilot devices shall 30 millimeters, and pilot lights shall be illuminated by LEDs.
2) LOCAL-STOP-REMOTE selector switch.
3) LOCAL mode control devices:
a) Operate valve when LOCAL-STOP-REMOTE integral to
actuator is in REMOTE and LOCAL-STOP-REMOTE on remote
control station is in LOCAL.
b) OPEN-STOP-CLOSE maintained switch or OPEN, STOP, and CLOSE pushbuttons where Maintained operation is indicated in the Actuator Schedule.
c) OPEN-CLOSE spring-return switch or OPEN and CLOSE
pushbuttons where momentary operation is indicated in the Attachment A - Intelligent Actuator Schedule.
4) Pilots’ lights to indicate valve position:
a) Fully open.
b) Fully closed.

4. Coatings:
a. Material requirements:
1) Factory prime and coat with an ISO 12944 classification coating of C5M (Marine, offshore estuaries with high salinity) coating with 15-year durability.
2) Touch-up damaged coatings with manufacturer provided coating repair kit.
b. Application requirements:
1) Painting shall commence within four hours of blast cleaning. 2) Each paint coat within the system is to be applied in accordance with the paint manufacturer’s instructions.
3) Paint thickness shall be checked for each coat on each actuator. c. Qualification requirements:
1) Operators shall be experienced and proficient in surface preparation and coating application techniques.
2) Personnel shall have relevant knowledge of health and safety hazard, use of protective equipment, coating materials, mixing and thinning coatings, coating pot life, surface requirements etc. 3) Personnel carrying out inspection or verification shall be certified as NACE coating inspector or equivalent such as ICorr.

5. Control inputs:
a. Capable of using discrete 120 VAC.
b. Controls the valve when LOCAL-STOP-REMOTE is in REMOTE. c. Isolated inputs capable of operating from external control voltage source or internal power supply:

Page 1861 of 3073 ends

Electric Actuators
13447-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) d. Provide the following inputs:
1) OPEN.
2) CLOSE.
3) STOP.
e. OPEN and CLOSE inputs configurable between maintained (actuator runs until end of travel, high torque, or a STOP input) and momentary (actuator stops when command is removed).

6. Status outputs:
a. Monitor relay output: Dry contact, normally closed, opens when actuator is not in REMOTE or in the event of any internal fault or alarm condition. b. Dry contact outputs configured for the functions indicated on the Drawings. Provide the following outputs for all actuators:
1) Fully closed.
2) Fully open.
3) LOCAL-STOP-REMOTE in REMOTE position.
a. All output contacts rated for 5 amps, 120 VAC, and 24 VDC.

7. Analog input:
a. Provide a 4-20 milliampere analog input for analog modulating valves when indicated on the Drawings.
b. Modulate valve to maintain position based on analog input value. c. Maximum input impedance 250 ohms.

8. Analog output:
a. Provide an isolated 4-20 milliampere analog output(s) when indicated on the Drawings.
1) Loop power sourced from the actuator power supply.
2) Capable of driving into a load up to 500 ohms.
3) Output proportional to process value(s) indicated on the Drawings. 4) Valve or gate position.
5) Operating torque.

9. For actuators for non-vendor provided systems, provide native EtherNet/IP connectivity.

E. Features:

1. Time delay on reversal: Incorporate time delay between stopping actuator and starting in opposite direction to limit excessive current, torque, and heating from instantaneous reversal.

2. Data logging:
a. Store diagnostic data and reference data.
b. Time-stamped historical operating data, including number of operations and most recent operations.

3. Provide display of logged data on the actuator, or provisions to download to a personal computer.

F. Materials:

1. Construct motorized actuators of materials suitable for the environment in which actuator is to be installed.
a. Enclosure ratings:
1) As scheduled with the following requirements.
a) All actuators will be double sealed for corrosion protection rated at ip68.

Page 1862 of 3073 ends

Electric Actuators
13447-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) 2) NEMA 4X for all actuators located outside of Class I areas. 3) All others shall be rated FM - Class I Groups B,C and D and Class II E, F, and G.

G. Components:

1. Motors:
a. Specifically designed for valve actuator service with high starting torque, totally enclosed non-ventilated construction.
b. Torque ratings equal to or greater than that required for valve seating and dynamic torques with a 25 percent factor of safety.
1) Design requirements for rubber-seated AWWA butterfly valves:
a) Design actuators for maximum gate or valve operating torque, in accordance with and using safety factors required in
AWWA C504 and AWWA C542.
(1) Valve actuator torque requirement for open-close service:

Not less than the required valve-seating and dynamic
torques under design operating conditions in accordance with AWWA C504.
(2) Valve actuator torque requirement for modulating service:

Not less than twice the required valve dynamic torque
under design operating conditions in accordance with
AWWA C504.
2) Design requirements for slide gates, gate valves, knife gate valves, globe valves, and diaphragm valves:
a) Design valves and actuators for maximum operating torque, in accordance with and using safety factors required in
AWWA C542.
b) Design for the maximum torque and thrust running load over the full cycle.
c) Maximum torque or thrust rating: The actuator stall torque or maximum thrust output shall not exceed the torque or thrust capability of the valve or gate, as determined by the valve or gate manufacturer.
c. Capable of being removed and replaced without draining the actuator gear case.
d. Motor bearings shall be amply proportioned of the anti-friction type and permanently lubricated.
e. Rated for operating under the following conditions without exceeding temperature limits with ambient temperature of 40 degrees Celsius. 1) Continuous operation for 15 minutes or twice the open-to-close operating time (whichever is greater) at normal operating torque or 33 percent of maximum torque (whichever is greater).
2) 60 starts per hour for open/close service or 1,200 starts per hour for modulating service.
f. Provide the following motor protection features:
1) Jammed valve (no valve motion detected through a time delay). 2) High motor temperature (sensed by an embedded thermostats). 3) High torque.
4) Single phasing protection.

Page 1863 of 3073 ends

Electric Actuators
13447-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) H. Enclosures:

1. Actuator housing ratings as indicated in the Motorized Actuator Schedule.

2. Stainless steel external fasteners.

3. Provide O-ring seals for each of the following areas:
a. Between the terminal compartment and the internal electrical elements. b. Between the mechanical and electrical portions to protect from the ingress of oil, and to protect the mechanical components of oil from dust and moisture when the electrical terminal is open.

4. Provide actuators with the following minimum enclosure ratings as scheduled:
a. NEMA Type 4X enclosure for general applications.
b. NEMA Type 6P rated for actuators in underground vaults or where possible submergence is indicated in the Drawings.
1) Suitable for a minimum of 48 hours submerged under 3 meters of water.
c. NEMA Type 7 certified by FM for Class I, Division 1, Groups C, D, E, F, and G, for actuators installed in Class I, Division 1 and 2 areas.

I. Position sensing:

1. Electronic and adjustable using a solid-state encoder wheel. a. Mechanical limit switches and potentiometers are not acceptable.

2. Capable of retaining position and monitoring valve or gate motion when valve is manually actuated and when main power is not present.

3. Valve range and position switch outputs field adjustable.

J. Torque sensing:

1. Torque shutdown setting: 40 percent to 100 percent rated torque:
a. Adjustable in 1 percent increments.

2. Capable of interrupting control circuit during both opening and closing and when valve torque overload occurs.

3. Electrical or electronic torque sensing.

4. Independent of variations in frequency, voltage, or temperature.

5. The actuator shall store actual operational torque curves for retrieval by plant maintenance staff.

6. Provide a temporary inhibit of the torque sensing system during unseating or during starting in mid-travel against high inertia loads.

7. Provide visible verification of torque switch status without any housing disassembly.

K. Manual actuators:

1. Hand wheel for manual operation.
a. Maximum 80-pound pull on rim when operating gate or valve under maximum load.
b. Provide pull chain when motorized actuator is located more than 6 feet above floor surface.
1) Chain shall be of sufficient length to reach approximately 4 feet above the operating level.

Page 1864 of 3073 ends

Electric Actuators
13447-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) 2) Where the chain obstructs an aisle or walkway, provide holdback or other means to ensure chain does not create a nuisance or hazard to operating personnel.
3) Provide Type 316 stainless steel.

2. Declutch lever: Padlockable, capable of mechanically disengaging motor and related gearing and freeing hand wheel for manual operation.

L. Gearing: Hardened alloy steel spur or helical gears and self-locking, alloy bronze worm gear set.

1. Accurately cut to ensure minimum backlash.

M. Bearings:

1. Anti-friction bearing with caged balls or rollers throughout.

2. Sealed-for-life type thrust bearings housed in a separate thrust base.

N. Drive bushing:

1. Easily detachable for machining to suit the valve stem or gearbox input shaft.

2. Positioned in a detachable base of the actuator.

O. Lubrication:

1. Provide totally enclosed actuator gearing with oil or grease filled gear case suitable for operation at any angle.

2. Actuators requiring special or exotic lubricants are not acceptable.

2.03 ACCESSORIES
A. Software:

1. Furnish PC-based diagnostic and configuration software to display diagnostic data.

2. Provide software communications to the valve actuator using Bluetooth wireless communications.
a. Provide all accessories and drivers required for operation and communications with a standard personal computer running Microsoft Windows.

B. Termination module cover:

1. For actuators on a valve network, provide a means to keep the valve network in service, in the event where the actuator must be removed.

2. Provide sunshades for all outdoor installations of remote control stations that use an LCD or similar screen. Regular pushbutton, sector switches, and pilot light control stations will not require a sunshade.

2.04 SPARE PARTS AND SPECIAL TOOLS
A. As specified in Section 01600 - Product Requirements.

B. Spare parts:

1. Provide the following (minimum 10 percent of total number of actuators of each model type furnished, but not less than 1 for each model of actuator furnished):
a. Stem nut.

Page 1865 of 3073 ends

Electric Actuators
13447-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) b. Worm shaft subassembly.
c. Drive sleeve subassembly.
d. Complete actuator seal kit.
e. Actuator gearbox oil (sufficient quantity to fill 4 gearboxes). f. Encoder.
g. Control module.

2. Provide 1 spare motor for each size motor furnished.

PART 3 EXECUTION

3.01 GENERAL
A. As specified in Section 15050 - Common Work Results for Mechanical Equipment.

B. Position visual indicators so that they are most easily visible.

3.02 COMMISSIONING
A. As specified in Section 01756 - Commissioning, Section 15958 - Mechanical Equipment Testing, and this Section.

B. Manufacturer services:

1. Provide certificates:
a. Manufacturer’s Certificate of Source Testing:
1) Proof-of-Design and Performance Test Reports in accordance with AWWA C542.
b. Manufacturer’s Certificate of Installation and Functionality Compliance.

2. Manufacturer’s Representative on-site requirements:
a. Installation: 2 trips, 2-day minimum each.
b. Functional testing: 2 trips, 2-day minimum each.

3. Training:
a. Maintenance: 4 hours per session, 2 sessions.
b. Operation: 2 hours per session, 2 sessions.

C. Source testing:

1. Design and Performance Test Reports in accordance with AWWA C542.

2. Test each actuator with a simulated load.
a. Simulate a typical valve load.

3. Electrical Instrumentation and Controls:
a. Test witnessing: not witnessed.
b. Conduct testing as specified in Section 17950 - Commissioning for Instrumentation and Controls.

D. Functional testing:

1. Installed actuator:
a. Test witnessing: Witnessed.
b. Conduct Level 2 General Equipment Performance Tests. c. Conduct Level 2 Vibration Tests.
d. Conduct Level 2 Noise Tests.

Page 1866 of 3073 ends

Electric Actuators
13447-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal)

2. Electrical Instrumentation and Controls:
a. Test witnessing: Witnessed.
b. Conduct testing as specified in Section 17950 - Commissioning for Instrumentation and Controls.

3.03 INTELLIGENT ACTUATOR SCHEDULE
A. Provide actuators indicated on the Drawings:

1. Major process actuators are listed in the Intelligent Actuator Schedule shown in Attachment A - Intelligent Actuator Schedule
a. Attachment A - Intelligent Actuator Schedule does not include all number and types of actuators required for the Project.

END OF SECTION

Page 1867 of 3073 ends

Electric Actuators
13447-Attachment A 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal)

ATTACHMENT A - INTELLIGENT ACTUATOR SCHEDULE

Page 1868 of 3073 ends
Page 1869 of 3073 ends

Electric Actuators
13447-Attachment A-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal)

INTELLIGENT ACTUATOR SCHEDULE
Item Reference DWG Type Size Duty NEMA Rating Voltage/Phase/Hz Notes Service Controls FV-60100 60M01, 60N01 BFV 24” ST 4X 480/3
60 Hz - O/C E-IP
FV-60102 60M01, 60N01 BFV 24” ST 4X 480/3
60 Hz - O/C E-IP
FCV-85211 85M02, 85N01 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85212 85M02, 85N01 BFV 6” ST 4X 480/3
60 Hz - O/C D O/C
FV-85214 85M02, 85N01 LA - ST 4X 480/3
60 Hz - O/C D O/C
FV-85217 85M02, 85N01 BFV 14” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85218 85M02, 85N01 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85219 85M02, 85N01 BFV 8” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85221 85M02, 85N02 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85222 85M02, 85N02 BFV 6” ST 4X 480/3
60 Hz - O/C D O/C
FV-85224 85M02, 85N02 LA - ST 4X 480/3
60 Hz - O/C D O/C
FV-85227 85M02, 85N02 BFV 14” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85228 85M02, 85N02 BFV 12” MD 4X 480/3
60 Hz - MOD A

Page 1870 of 3073 ends

Electric Actuators
13447-Attachment A-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) Item Reference DWG Type Size Duty NEMA Rating Voltage/Phase/Hz Notes Service Controls FV-85229 85M02, 85N02 BFV 8” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85231 85M02, 85N03 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85232 85M02, 85N03 BFV 6” ST 4X 480/3
60 Hz - O/C D O/C
FV-85234 85M02, 85N03 LA - ST 4X 480/3
60 Hz - O/C D O/C
FV-85237 85M02, 85N03 BFV 14” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85238 85M02, 85N03 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85239 85M02, 85N03 BFV 8” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85241 85M02, 85N04 BFV 12” MD 4X 480/3
60 Hz - MOD A
FV-85242 85M02, 85N04 BFV 6” ST 4X 480/3
60 Hz - O/C D O/C
FV-85244 85M02, 85N04 LA - ST 4X 480/3
60 Hz - O/C D O/C
FV-85247 85M02, 85N04 BFV 14” ST 4X 480/3
60 Hz - O/C D O/C
FCV-85248 85M02, 85N04 BFV 12” MD 4X 480/3
60 Hz - MOD A

Page 1871 of 3073 ends

Electric Actuators
13447-Attachment A-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/13447 (BidSetFinal) Item Reference DWG Type Size Duty NEMA Rating Voltage/Phase/Hz Notes Service Controls FV-85249 85M02, 85N04 BFV 8” ST 4X 480/3
60 Hz - O/C D O/C
FV-87130 87M01, 87N01 BFV 14” ST 4X 480/3
60 HZ - O/C D O/C
Notes:

None.

Abbreviations:

Types:

BFV = Butterfly Valve.

BV = Ball Valve.

PV = Plug Valve.

SG = Slide Gate.

Duty:

ST = Standard service (0-60 starts/hr) duty.

MD = Modulating duty (~1000 starts/hr).

Service:

O/C = Open/Close.

MOD = Modulating.

Controls:

PA = Profibus PA.

DP = Profibus DP.

DN = DeviceNet.

E-IP = Ethernet/IP.

E-TCP = Ethernet TCP or TCP/IP.

FF = Foundation Fieldbus H1.

MB = Modbus RTU (RS-485).

NET = Manufacturer’s proprietary network.

A = Analog (4-20 mA) control, modulating.

D O/C = Discrete open/close.

D JOD = Position control using discrete jumps.

Page 1872 of 3073 ends
Page 1873 of 3073 ends

2795 MITCHELL DRIVE • WALNUT CREEK, CALIFORNIA 94598-1601 • P. 925.932.1710 pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00002b

CITY OF UKIAH

UKIAH, CA
RECYCLED WATER PIPELINE PROJECT – PHASE 4
CLIENT PROJECT NO. 8860F10

TECHNICAL SPECIFICATIONS

BID SET
VOLUME 2 OF 3
APRIL 2023
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 07:24:57-07'00'
ATTACHMENT 4 - VOLUME 2

Page 1874 of 3073 ends
Page 1875 of 3073 ends

Seals Page
00003-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00003 (BidSetFinala)

CITY OF UKIAH
RECYCLED WATER PIPELINE PROJECT - PHASE 4

DISCIPLINES RESPONSIBLE FOR SPECIFICATION SECTIONS

CIVIL PROCESS/MECHANICAL

STRUCTURAL ELECTRICAL

INSTRUMENTATION & CONTROLS
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 10:06:15-07'00'
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:12:04-04'00'
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 13:14:10-07'00'
Digitally signed by Erik M. Bahneman
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 13:04:40-07'00'
Digitally signed by Brett A. Lee
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 11:16:48-06'00'

Page 1876 of 3073 ends
Page 1877 of 3073 ends

Table of Contents
00010-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal)

CITY OF UKIAH
RECYCLED WATER PIPELINE PROJECT – PHASE 4

TABLE OF CONTENTS
VOLUME 1 OF 3
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF

THE CONTRACT
SECTION NO. TITLE
00101 SPECIAL PROVISIONS
00436 LIST OF EQUIPMENT MANUFACTURERS
00602 ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF

RETENTION
00625 CERTIFICATE OF SUBSTANTIAL COMPLETION
00632 REQUEST FOR INFORMATION OR INTERPRETATION (RFI)
00820 FEDERAL AND STATE FUNDING REQUIREMENTS
00823 ESCROW BID DOCUMENTS
00940 WORK CHANGE DIRECTIVE
00941 CHANGE ORDER
00942 FIELD ORDER
DIVISION 01 - GENERAL REQUIREMENTS
SECTION NO. TITLE
01110 SUMMARY OF WORK
01116 CONTRACT DOCUMENT LANGUAGE
01140 WORK RESTRICTIONS
01150 MITIGATION AND MONITORING REQUIREMENTS
01220 MEASUREMENT AND PAYMENT
01260 CONTRACT MODIFICATION PROCEDURES
01292 SCHEDULE OF VALUES
01294 APPLICATIONS FOR PAYMENT
01312 PROJECT MEETINGS
01321 SCHEDULES AND REPORTS
01322 WEB BASED CONSTRUCTION DOCUMENT MANAGEMENT
01330 SUBMITTAL PROCEDURES
01340 PHOTOGRAPHIC AND VIDEOGRAPHIC DOCUMENTATION
01354 HAZARDOUS MATERIAL PROCEDURES
01357 DELEGATED DESIGN PROCEDURES
01410 REGULATORY REQUIREMENTS
01439 MOCKUPS
01450 QUALITY CONTROL
01455 REGULATORY QUALITY ASSURANCE

Page 1878 of 3073 ends

Table of Contents
00010-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) 01460 CONTRACTOR QUALITY CONTROL PLAN
01500 TEMPORARY FACILITIES AND CONTROLS
01550 TRAFFIC CONTROL
01562 TEMPORARY TREE AND PLANT PROTECTION
01573 EROSION AND SEDIMENT CONTROL
01600 PRODUCT REQUIREMENTS - PLANT
01601 PRODUCT REQUIREMENTS - LINEAR INFRASTRUCTURE
01722 FIELD ENGINEERING
01734 WORK WITHIN PUBLIC RIGHT-OF-WAY
01738 SELECTIVE ALTERATIONS AND DEMOLITION
01756 COMMISSIONING
01759 WATER LEAKAGE TEST FOR CONCRETE STRUCTURES
01770 CLOSEOUT PROCEDURES
01782 OPERATION AND MAINTENANCE MANUALS
01783 WARRANTIES AND BONDS
01850 DESIGN CRITERIA
DIVISION 02 - SITE CONSTRUCTION
SECTION NO. TITLE
02001 COMMON WORK RESULTS FOR GENERAL PIPING - LINEAR

INFRASTRUCTURE
02003 PIPE IDENTIFICATION - LINEAR INFRASTRUCTURE
02005 PIPING SPECIALTIES - LINEAR INFRASTRUCTURE
02007 PIPE COUPLINGS - LINEAR INFRASTRUCTURE
02009 PIPING SYSTEMS TESTING - LINEAR INFRASTRUCTURE
02050 SOILS AND AGGREGATES FOR EARTHWORK
02200 SITE CLEARING
02240 DEWATERING - PLANT
02241 DEWATERING - LINEAR INFRASTRUCTURE
02260 EXCAVATION SUPPORT AND PROTECTION
02280 SUBSURFACE UTILITY ENGINEERING
02300 EARTHWORK
02301 LINED POND EARTHWORK
02312 CONTROLLED LOW STRENGTH MATERIAL (CLSM)
02318 TRENCHING
02370 RIPRAP AND GABIONS EROSION AND SEDIMENTATION CONTROL 02441 MICROTUNNELING
02448 JACKING STEEL PIPE CASINGS
02460 PILE LOAD TESTS
02466A BORED AND AUGERED PILES
02466B AUGERED PRESSURE-GROUTED PILES
02467A DRILLED CONCRETE PIERS
02581 PRECAST ELECTRICAL HANDHOLES AND ELECTRICAL MANHOLES 02600 CONCRETE MANHOLES

Page 1879 of 3073 ends

Table of Contents
00010-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) 02620 FILTER FABRIC
02621 STABILIZATION FABRIC
02693 DUCTILE IRON PIPE: AWWA C151
02705 POLYVINYL CHLORIDE (PVC) PIPE: GRAVITY
02706 POLYVINYL CHLORIDE (PVC) PIPE: PRESSURE - LINEAR

INFRASTRUCTURE
02710 POLYVINYL CHLORIDE (PVC) PIPE: SCHEDULE TYPE
02742A ASPHALTIC CONCRETE PAVING (CA)
02747 BITUMINOUS PAVEMENT SURFACE SEAL
02762 PAVEMENT MARKINGS
02772 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
02820 FENCES AND GATES
02939 SEEDING
02952 PAVEMENT RESTORATION AND REHABILITATION
DIVISION 03 - CONCRETE
SECTION NO. TITLE
03055 ADHESIVE-BONDED REINFORCING BARS AND ALL THREAD RODS IN

CONCRETE
03071 EPOXIES
03072 EPOXY RESIN/PORTLAND CEMENT BONDING AGENT
03102 CONCRETE FORMWORK
03150 CONCRETE ACCESSORIES
03154 HYDROPHILIC RUBBER WATERSTOP
03200 CONCRETE REINFORCING
03300 CAST-IN-PLACE CONCRETE
03366 TOOLED CONCRETE FINISHING
03371 SHOTCRETE
03600 GROUTING
03922 PREPACKAGED SMALL AGGREGATE REPAIR CONCRETE
03931 EPOXY INJECTION SYSTEM
DIVISION 04 - MASONRY
SECTION NO. TITLE
04055 ADHESIVE BONDING REINFORCING BARS AND ALL THREAD RODS IN

MASONRY
04090 MASONRY ACCESSORIES
04100 MORTAR AND MASONRY GROUT
04220 CONCRETE UNIT MASONRY
04221 BRICK MASONRY

Page 1880 of 3073 ends

Table of Contents
00010-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) DIVISION 05 - METALS
SECTION NO. TITLE
05120 STRUCTURAL STEEL FRAMING
05140 STRUCTURAL ALUMINUM
05190 MECHANICAL ANCHORING AND FASTENING TO CONCRETE AND

MASONRY
05310 STEEL DECKING
05500 METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION NO. TITLE
07110 DAMPPROOFING
07190 WATER REPELLENTS
07220 ROOF AND DECK INSULATION
07530 ELASTOMERIC MEMBRANE ROOFING
07540 THERMOPLASTIC POLYOLEFIN (TPO) MEMBRANE ROOFING
07600 FLASHING AND SHEET METAL
07700 ROOF SPECIALTIES
07722 ROOF HATCHES
07723 STEEL ROOFING WALKWAYS
07900 JOINT SEALANTS
DIVISION 08 - DOORS AND WINDOWS
SECTION NO. TITLE
08110 HOLLOW METAL DOORS AND FRAMES
08320 FLOOR ACCESS DOORS
08710 DOOR HARDWARE
DIVISION 09 - FINISHES
SECTION NO. TITLE
09910 PAINTING
09960 HIGH-PERFORMANCE COATINGS
09986 PAINTING PRESTRESSED CONCRETE WATER TANKS
DIVISION 10 - SPECIALTIES
SECTION NO. TITLE
10400 SIGNAGE
10520 FIRE PROTECTION SPECIALTIES
10732 SHADE FABRIC

Page 1881 of 3073 ends

Table of Contents
00010-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) DIVISION 11 - EQUIPMENT
SECTION NO. TITLE
11242 LIQUID CHEMICAL DIAPHRAGM-TYPE METERING PUMPS
11294B HEAVY-DUTY FABRICATED STAINLESS STEEL SLIDE GATES 11312D VERTICAL TURBINE SHORT SETTING CENTRIFUGAL PUMPS 11312O HORIZONTAL ANSI CENTRIFUGAL PUMPS
11313E HORIZONTAL SELF-PRIMING SAMPLE CENTRIFUGAL PUMPS 11376A ROTARY-LOBE BLOWERS
11802 PACKAGED WATER TREATMENT SYSTEM REHABILITATION
DIVISION 13 - SPECIAL CONSTRUCTION
SECTION NO. TITLE
13206F HYDROPNEUMATIC BLADDER TANK
13207 STRAND-WOUND CIRCULAR PRESTRESSED CONCRETE TANK WITH

A TYPE I CORE WALL AND FLAT ROOF
13446 MANUAL ACTUATORS
13447 ELECTRIC ACTUATORS
VOLUME 2 OF 3
DIVISION 15 - MECHANICAL
SECTION NO. TITLE
15050 COMMON WORK RESULTS FOR MECHANICAL EQUIPMENT
15052 COMMON WORK RESULTS FOR GENERAL PIPING
15061 PIPE SUPPORTS
15062 PREFORMED CHANNEL PIPE SUPPORT SYSTEM
15063 NON-METALLIC PIPE SUPPORT SYSTEM
15076 PIPE IDENTIFICATION
15082 PIPING INSULATION
15110 COMMON WORK RESULTS FOR VALVES
15111 BALL VALVES
15112 BUTTERFLY VALVES
15114 CHECK VALVES
15115 GATE, GLOBE, AND ANGLE VALVES
15116 PLUG VALVES
15117 SPECIALTY VALVES
15118 PRESSURE CONTROL VALVES
15119 AIR AND VACUUM RELIEF VALVES
15120 PIPING SPECIALTIES
15121 PIPE COUPLINGS
15127 DUCTILE IRON BALL-TYPE FLEXIBLE EXPANSION JOINTS
15200 METERED SERVICES
15209 HIGH-SILICON CAST IRON PIPE FOR DIGESTER GAS

Page 1882 of 3073 ends

Table of Contents
00010-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) 15211 DUCTILE IRON PIPE: AWWA C151
15230 PLASTIC PIPING AND TUBING
15244 POLYVINYL CHLORIDE (PVC) PIPE: PRESSURE
15249 POLYVINYL CHLORIDE (PVC) PIPE: SCHEDULE TYPE
15286 STAINLESS STEEL PIPE AND TUBING
15400 PLUMBING SYSTEMS
15500 COMMON WORK RESULTS FOR HVAC
15732 AIR CONDITIONING UNITS
15936 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
15954 TESTING, ADJUSTING, AND BALANCING FOR HVAC
15956 PIPING SYSTEMS TESTING
15958 MECHANICAL EQUIPMENT TESTING
DIVISION 16 - ELECTRICAL
SECTION NO. TITLE
16050 COMMON WORK RESULTS FOR ELECTRICAL
16060 GROUNDING AND BONDING
16070 HANGERS AND SUPPORTS
16075 IDENTIFICATION FOR ELECTRICAL SYSTEMS
16123 600-VOLT OR LESS WIRES AND CABLES
16125 FIBER OPTIC CABLE AND APPURTENANCES
16130 CONDUITS
16133 DUCT BANKS
16134 BOXES
16140 WIRING DEVICES
16150 LOW VOLTAGE WIRE CONNECTIONS
16210 UTILITY COORDINATION
16222 LOW VOLTAGE MOTORS UP TO 500 HORSEPOWER
16262 VARIABLE FREQUENCY DRIVES 0.50 - 50 HORSEPOWER
16265 REDUCED HARMONIC VARIABLE FREQUENCY DRIVES
16272 DRY-TYPE TRANSFORMERS
16285 SURGE PROTECTIVE DEVICES
16290 ELECTRICAL POWER MONITORING
16305 ELECTRICAL SYSTEM STUDIES
16411 DISCONNECT SWITCHES
16412 LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS
16422 MOTOR STARTERS
16441 GROUP-MOUNTED CIRCUIT BREAKER SWITCHBOARDS
16445 PANELBOARDS
16494 LOW VOLTAGE FUSES
16510 LIGHTING: LED LUMINAIRES
16950 FIELD ELECTRICAL ACCEPTANCE TESTS
16990 CONDUIT SCHEDULE

Page 1883 of 3073 ends

Table of Contents
00010-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/00010 (BidSetFinal) DIVISION 17 - INSTRUMENTATION AND CONTROLS
SECTION NO. TITLE
17050 COMMON WORK RESULTS FOR PROCESS CONTROL AND

INSTRUMENTATION SYSTEMS
17100 CONTROL STRATEGIES
17101 SPECIFIC CONTROL STRATEGIES
17201 LEVEL MEASUREMENT: SWITCHES
17206 LEVEL MEASUREMENT: ULTRASONIC
17208 LEVEL MEASUREMENT: RADAR PULSE TIME OF FLIGHT (PTOF) 17301 FLOW MEASUREMENT: SWITCHES
17302 FLOW MEASUREMENT: MAGNETIC FLOWMETERS
17316 FLOW MEASUREMENT: ROTAMETERS (VARIABLE AREA

FLOWMETERS)
17317 FLOW MEASUREMENT: OPEN CHANNEL
17402 PRESSURE/VACUUM MEASUREMENT: INSTRUMENT VALVES
17404 PRESSURE/VACUUM MEASUREMENT: GAUGES
17405 PRESSURE/VACUUM MEASUREMENT: DIRECT
17407 PRESSURE MEASUREMENT: SUBMERSIBLE
17505 ANALYZERS: RESIDUAL CHLORINE
17710 CONTROL SYSTEMS: PANELS, ENCLOSURES, AND PANEL

COMPONENTS
17720 CONTROL SYSTEMS: PROGRAMMABLE LOGIC CONTROLLERS
17721 CONTROL SYSTEMS: LOCAL OPERATOR INTERFACE (LOI)
17733 CONTROL SYSTEMS: NETWORK MATERIALS AND EQUIPMENT
17750 CONTROL SYSTEMS: WIRELESS COMMUNICATIONS - RADIO
17901 SCHEDULES: FIELD INSTRUMENTS
17903 SCHEDULES: I/O LIST
17950 COMMISSIONING FOR INSTRUMENTATION AND CONTROLS

APPENDICES

APPENDIX TITLE

APPENDIX A MITIGATION MONITORING AND REPORTING PROGRAM
APPENDIX B WWTP GEOTECHNICAL REPORT (REVISION 2)

APPENDIX C RECYCLED WATER PIPELINE GEOTECHNICAL REPORT

Page 1884 of 3073 ends
Page 1885 of 3073 ends

Common Work Results for Mechanical Equipment
15050-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) SECTION 15050

COMMON WORK RESULTS FOR MECHANICAL EQUIPMENT
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Mechanical equipment requirements for:
a. Basic design and performance criteria.
b. Prescriptive requirements for common components.
c. Installation requirements.

1.02 REFERENCES
A. American Bearing Manufactures Association (ABMA):

1. 9 - Load Ratings and Fatigue Life for Ball Bearings.

2. 11 - Load Ratings and Fatigue Life for Roller Bearings.

B. American Gear Manufacturer's Association (AGMA) Standards.

C. ASTM International (ASTM):

1. A193 - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications.

2. A194 - Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both.

3. A320 - Standard Specification for Alloy-Steel and Stainless Steel Bolting for Low-Temperature Service.

4. F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs.

5. F594 - Standard Specification for Stainless Steel Nuts.

D. Hydraulic Institute (HI):

1. 9.6.8 - Guideline for Dynamics of Pumping Machinery.

E. International Concrete Repair Institute (ICRI):

1. Guideline No. 310.2R, Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair.

F. International Organization for Standardization (ISO):

1. 21940 - Mechanical Vibration - Rotor Balancing - Part 1: Introduction.

G. National Electrical Manufacturers Association (NEMA):

1. MG-1 - Motors and Generators.

H. Society for Protective Coatings (SSPC):

1. SP-1-Solvent Cleaning.

Page 1886 of 3073 ends

Common Work Results for Mechanical Equipment
15050-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

1.03 DEFINITIONS
A. Definitions used in this specification and equipment submittals for terms related to rotor-dynamic pumps shall be in accordance with HI 9.6.8, Appendix A, as clarified below.

B. These definitions shall be applied to equipment other than pumps, unless otherwise specified in technical sections.

C. Rotordynamic Analysis Level:

1. The level of detail required for rotordynamic analysis is indicated in the technical sections schedules as None (no analysis required), Analysis Level 1, Analysis Level 2, or Analysis Level 3, which correlate to increasing levels of required detailed equipment design analysis. Analysis Levels 1, 2 and 3 are based on HI 9.6.8.

2. Where these specifications differ from HI the more stringent shall apply.

D. Resonant Frequency:

1. The frequency of a periodic excitation force that is close to the natural frequencies of an object. Also known as critical frequency, critical speed, or resonant speed.

2. An undamped resonant frequency within the separation margin is always considered harmful under Level 1 analysis.

3. A resonant frequency that occurs within a separation margin of 15 percent above or below the operating speed range and has a log decrement greater than +0.3 is considered harmful under Level 2 and Level 3 analysis.

E. Separation margin:

1. The span of operating speeds within which interference between excitation orders and resonant frequencies indicate the possibility of harmful vibrations.

2. The separation margin for a specific application extends 15 percent above and 15 percent below the span of operating speed required for the specified performance conditions.

1.04 ADMINISTRATIVE REQUIREMENTS
A. Roof coordination:

1. Show roof penetrations for mechanical equipment on roof drawing submittal and include mechanical equipment information:
a. Type.
b. Size.
c. Location.
d. Configuration of penetration and the surround.
e. Weight.
f. Anchoring and support details.

Page 1887 of 3073 ends

Common Work Results for Mechanical Equipment
15050-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

1.05 SUBMITTALS
A. Items in this Section are components of equipment or systems specified in other sections.

1. Include data for this Section’s components with the equipment or system submittal.

PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. General:

1. Equipment manufacturer's responsibility extends to selection and mounting of gear drive units, motors or other prime movers, accessories, and auxiliaries to provide a complete, operable unit.

2. Manufacturer shall analyze all rubber-bearing vertical-column pumps, and equipment identified as non-reversing in the technical sections for reverse rotation and provide non reversing motor ratchets.

3. Equipment that prevents reverse rotation shall be capable of both:
a. Handling 150 percent of the maximum torque at maximum operating speed.
b. 150 percent of torque that will be generated in reverse direction due to equipment shutoff head as calculated by the manufacturer.

4. The motor shall be designed to run safely in the reverse direction at up to 140 percent times the reverse runaway speed under shutoff head conditions.

B. Rotordynamic analysis and vibration testing:

1. Submit information for the Rotordynamic Analysis Level specified for each piece of equipment as shown in the Technical Sections prior to manufacture of the equipment.

2. Rotordynamic analysis shall be performed on "like-new" and "as-worn" conditions, representing conditions when first installed and conditions when parts wear to the manufacturer's maximum allowable operating tolerances.

Conditions assumed for the "as-worn" condition shall be 2 times the "like-new" tolerances unless specified otherwise.

3. Rotordynamic analysis criteria:
a. Torsional excitation forcing function magnitudes shall be no less than 1 percent of the maximum transmitted torque at given speed. b. Motor mass elastic information in accordance with NEMA MG-1 shall be obtained from the original equipment manufacturer and included in the analysis. Motors shall be precision balanced to ISO 21940 grade G2.5. c. Bearings:
1) At maximum bearing loads an L-10 life of 100,000 hours in accordance with ABMA 9-11 to be proven.

4. Submit factory and field testing requirements as specified in the Technical Sections and specified in Section 15958 - Mechanical Equipment Testing after manufacture and installation respectively.

Page 1888 of 3073 ends

Common Work Results for Mechanical Equipment
15050-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

5. Repair, replace, and modify equipment exhibiting vibration performance that does not meet criteria specified in this Section at no additional cost to Owner.

Acceptable remedies include adjustments to equipment component geometry, materials, energy absorbing couplings, etc. Locking out speed interval(s) within equipment specified operating range is unacceptable.

6. Vibration analysis expert:
a. Provide vibration analysis expert when specified in the equipment Technical Sections:
1) The vibration analysis expert must be a 3rd party, unaffiliated with the equipment vendor or Contractor.
b. The vibration analysis expert, and analysis shall be provided by one of the following or equal:
1) Mechanical Solutions, Inc. (MSI, New Jersey).
2) Engineering Dynamics Inc. (EDI, Texas).
c. The analysis shall be:
1) Stamped by a registered professional mechanical engineer. 2) Verified in-situ by the vibration analysis expert including certification that installation conforms to field conditions assumed in the reports. 3) Verified in-situ by the vibration analysis expert including witness of at least one field vibration test, and certification that vibration measurements corroborate the rotordynamic analysis.
4) Supplemented with additional field investigation and analysis should conditions during field vibration testing activity indicate non-compliance with these specifications; supplemental field investigation and analysis shall indicate remedies to comply with the specifications and shall be stamped by a registered professional mechanical engineer.

7. Rotordynamic Analysis Level 1:
a. Before the equipment is released for manufacture it shall be determined that the equipment/motor structures do not have any harmful resonant frequencies in the lateral and torsional modes. Representative analysis results for identical equipment may be submitted.
b. Calculate rotor lateral and torsional and equipment structural components' lateral frequencies with a spreadsheet calculation or finite element analysis software.
1) Equipment structure lateral frequency shall include the motor. 2) Speed changing drive systems (belt, gear) effects on rotational inertia and stiffness shall be incorporated.
c. Determine the equipment system components (rotor and structure) resonant frequencies.
d. An intersection of an equipment component resonant frequency with the 1x run speed excitation order that occurs within separation margin is unacceptable.

8. Rotordynamic Analysis Level 2:
a. Before the equipment and motor are released for manufacture it shall be determined that the equipment/motor structures do not have any harmful critical speeds in the lateral and torsional modes.
b. Calculate rotor lateral and torsional and structure lateral frequencies with finite element analysis software.
1) Equipment structure lateral frequency shall include the motor.

Page 1889 of 3073 ends

Common Work Results for Mechanical Equipment
15050-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) 2) Speed changing drive systems (belt, gear) effects on rotational inertia and stiffness shall be incorporated.
3) The rotational inertia of water within the impeller, in the wet well and inside the equipment structure, e.g., the column of a vertical pump, shall be included in the calculation at both the high level and low level conditions.
c. Potentially harmful critical speeds shall be investigated further with a forced, damped analysis to determine component stresses do not exceed material properties.
d. Forced damped analysis:
1) Forced lateral analysis shall include forcing function magnitudes at least 10 percent of rotor disc weight at each disc position and hydraulic imbalance at 5 operating conditions spaced equally over the equipment operating range. If synchronous motors are used ensure that the rotor analysis includes startup, shutdown, and motor control transients.
2) Forced torsional analysis shall include not less than 1 percent of the maximum permitted torque at any given speed. Damping shall be one percent of critical at all shaft elements.
3) The equipment rotor total stress (steady-state and alternating torque components plus lateral-bending stresses) shall not exceed:
a) Constant torque: Total stress limited to 30 percent of the material fatigue limit and to a maximum of 18 percent of ultimate tensile strength.
b) Variable torque (including variable speed equipment): Total stress limited to 50 percent of the material fatigue limit and to a maximum of 4 percent of the material ultimate tensile strength. c) Submit documentation of material fatigue limit.
e. Report submittals:
1) Confirmation of compliance with this Section, or detailed exceptions taken.
2) Software used for analysis.
3) Results with interpretation.
4) Preparer's professional engineering stamp and seal.
5) Input data including component properties, materials, and connectivity to other components.
6) Schematic diagram of model mode shapes, nodes, and elements. 7) Bearing stiffness and damping properties, impeller/diffuser interaction coefficients, and seal dynamic properties.
8) Campbell diagrams showing the system natural frequencies, excitation orders, and operating speed range for both lateral and torsional analysis.
a) Campbell diagram shall include equipment operating range; excitation lines at 1x, 2x run speed, and vane pass (or equivalent); and critical speeds associated with equipment system components including the rotor, each major equipment structural component and the motor.
9) Forced, damped analysis indicating acceptable material stress limits are maintained at interference points shown on the Campbell diagram.

Page 1890 of 3073 ends

Common Work Results for Mechanical Equipment
15050-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

9. Rotordynamic Analysis Level 3:
a. Before the equipment and motor are released for manufacture it shall be determined that the equipment/motor structures do not have any harmful critical speeds in the lateral and torsional modes.
b. Calculate rotor lateral and torsional and structure lateral frequencies with finite element analysis software.
1) Equipment structure lateral frequency shall include the motor. 2) Speed changing drive systems (belt, gear) effects on rotational inertia and stiffness shall be incorporated.
3) The rotational inertia of water within the impeller, in the wet well and inside the equipment structure, e.g., the column of a vertical pump, shall be included in the calculation at both the high level and low level conditions.
c. Potentially harmful critical speeds shall be investigated further with a forced, damped analysis to determine component stresses do not exceed material properties.
d. Forced damped analysis:
1) Forced lateral analysis shall include forcing function magnitudes at least 10 percent of rotor disc weight at each disc position and hydraulic imbalance at 5 operating conditions spaced equally over the equipment operating range. If synchronous motors are used ensure that the rotor analysis includes startup, shutdown, and motor control transients.
2) Forced torsional analysis shall include 1 percent of the maximum permitted torque at any given speed. Damping shall be 1 percent of critical at all shaft elements.
3) The equipment rotor total stress (steady-state and alternating torque components plus lateral-bending stresses) shall not exceed:
a) Constant torque: Total stress limited to 30 percent of the material fatigue limit and to a maximum of 18 percent of ultimate tensile strength.
b) Variable Torque (including variable speed equipment): Total stress limited to 50 percent of the material fatigue limit and to a maximum of 4 percent of the material ultimate tensile strength. c) Submit documentation of material fatigue limit.
e. Report submittals:
1) Report 1: Executive Summary including:
a) Confirmation of compliance with this specification section, or detailed exceptions taken.
b) Software used for analysis.
c) Results with interpretation.
d) Preparer's professional engineering stamp and seal.

Page 1891 of 3073 ends

Common Work Results for Mechanical Equipment
15050-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) e) Campbell diagrams showing the system natural frequencies, excitation orders, and operating speed range for both lateral and torsional analysis.
(1) Campbell diagram shall include equipment operating range; excitation lines at 1x, 2x run speed, vane pass (or
equivalent), line- and twice-line frequency, motor-pole frequency, torsional harmonics from reciprocating drivers (including up to 6 times operating speed), control pulse frequencies induced by VFDs (with certification from VFD manufacturer of frequencies up to 24 times motor running speed), any torque harmonic greater than 1 percent of
steady torque at primary excitation, and synchronous motor requirements; and critical speeds associated with
equipment system components including the rotor and each major equipment structural component.
f) Report 1 shall not include detailed analysis elements listed for submittal under Report 2 below, submittal of full analysis details in Report 1 is unacceptable.
g) Following submittal of Report 1, submit Report 2: Detailed Analysis including responses to comments made on Report 1:

Rotor-dynamic Executive Summary.
2) Report 2: Rotor-dynamic Detailed Analysis including:
a) Input data including component properties, materials, and connectivity to other components.
b) Schematic diagram of model mode shapes, nodes, and
elements.
c) Bearing stiffness and damping properties, impeller/diffuser interaction coefficients, and seal dynamic properties.
d) Forced, damped analysis indicating acceptable material stress limits are maintained at interference points shown on the Campbell diagram.
e) Synchronous motor information including time-integration study results showing transient peak stresses at startup, shutdown, and motor control transient events. Provide tomographic diagrams including root and keyway stress concentration locations and the corresponding speeds that result in reported peak stresses.

2.02 POWER TRANSMISSION SYSTEMS
A. V-belts, sheaves, shaft couplings, chains, sprockets, mechanical variable-speed drives, variable frequency drives, gear reducers, open and enclosed gearing, clutches, brakes, intermediate shafting, intermediate bearings, and U-joints:

1. Rated for 24 hour-a-day continuous service, or for intermittent service with frequent stops-and-starts, whichever is most severe.

2. Sized with a service factor of 1.5 or greater:
a. Apply service factor to nameplate horsepower and torque of prime source of power and not to actual equipment loading.
b. Apply service factors in accordance with AGMA or as specified in the Technical Sections.

Page 1892 of 3073 ends

Common Work Results for Mechanical Equipment
15050-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

2.03 BEARINGS
A. Oil or grease lubricated, ball or roller antifriction type, of standard manufacture.

1. Design lubrication system based on the equipment location to operate in the temperatures as specified in Section 01850 - Design Criteria. a. Design lubrication system to safely start after being shut off for 24 hours and operate safely:
1) Suitable for the outdoor winter temperature as specified in Section 01850 - Design Criteria.

B. Oil-lubricated bearings:

1. Provide either pressure lubricating system or separate oil reservoir splash-type system as specified in the Technical Section.

2. Design oil-lubrication system to safely absorb heat energy generated in bearings when equipment is operating in the following conditions:
a. With the highest load and the temperature 15 degrees Fahrenheit above the outdoor summer temperature as specified in Section 01850 - Design Criteria.

C. Grease lubricated bearings, except those specified to be factory sealed:

1. Fit with easily accessible grease supply, flush, drain, and relief fittings.

2. Lubrication lines and fittings:
a. Lines: Minimum 1/4-inch diameter stainless steel tubing. b. Multiple fitting assemblies: Mount fittings together in easily accessible location.
c. Use standard hydraulic-type grease supply fittings:
1) Manufacturers: One of the following or equal:
a) Alemite.
b) Zerk.

D. Ratings: Rated in accordance with ABMA 9 or ABMA 11 L10 life for bearings rating life of not less than 50,000 hours.

2.04 BELT DRIVES
A. Sheaves:

1. Separately mounted on bushings by means of at least 3 pull-up bolts or cap tightening screws.

2. When 2 sheave sizes are specified, provide separate belts sized for each set of sheaves.

3. Statically balanced for all; dynamically balanced for sheaves that operate at a peripheral speed of more than 5,500 feet per minute.

4. Key bushings to drive shaft.

B. Belts:

1. Anti-static type when explosion-proof equipment or environment is specified.

2. When spare belts are specified, furnish 1 spare belt for every different type and size of belt-driven unit:
a. Where 2 or more belts are involved, furnish matched sets.

Page 1893 of 3073 ends

Common Work Results for Mechanical Equipment
15050-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) b. Identify as to equipment, design, horsepower, speed, length, sheave size, and use.
c. Package in boxes labeled with identification of contents.

C. Manufacturers: One of the following or equal:

1. Dodge, Dyna-V belts with matching Dyna-V sheaves and Taper-Lock bushings.

2. T. B. Woods, Ultra-V belts with matching Sure-Grip sheaves and Sure-Grip bushings.

2.05 FLANGED PIPING CONNECTIONS
A. Unless otherwise in the Technical Sections or indicated on the Drawings, provide flat face flanges.

2.06 ASSEMBLY FASTENERS
A. General service: Stainless steel, Type 316:

1. Bolts: In accordance with ASTM F593, Alloy Group 2.

2. Nuts: In accordance with ASTM F594, Alloy Group 2.

3. Washers: Alloy group matching bolts and nuts.

B. High-temperature service or high-pressure service: Stainless steel, Type 316:

1. Bolts: In accordance with ASTM A193, Grade B8M, Class 1, heavy hex.

2. Nuts: In accordance with ASTM A194, Grade 8, heavy hex.

3. Washers: Alloy group matching bolts and nuts.

C. Low-temperature service: Stainless steel, Type 316:

1. Bolts: In accordance with ASTM A320, Grade B8M, Class 1, heavy hex.

2. Nuts: In accordance with ASTM A194, Grade B8M, heavy hex.

3. Washers: Alloy group matching bolts and nuts.

2.07 GUARDS AT HIGH-TEMPERATURE SURFACES
A. Exposed surfaces having an external surface temperature of 120 degrees Fahrenheit or higher and located within 7 feet measured vertically from floor or working level or within 15 inches measured horizontally from stairways, ramps, or fixed ladders.

B. Cover with a thermal insulating material unless otherwise guarded against contact.

1. Insulation thickness such that the insulation exterior temperature is below 120 degrees Fahrenheit.

2. Insulation Type 3 and cover Type 5 as specified in Section 15082 - Piping Insulation.

2.08 GUARDS AT MOVING COMPONENTS
A. Provide guards on rotating components that are within 7.5 vertical feet of an operating floor or platform.

B. Allow visual inspection of moving parts without removal.

Page 1894 of 3073 ends

Common Work Results for Mechanical Equipment
15050-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) C. Allow access to lubrication fittings.

D. Easily removable for maintenance.

E. Prevent entrance of rain or dripping water for outdoor locations.

F. Size belt and sheave guards to allow for installation of sheaves 15 percent larger and addition of 1 belt.

G. Materials:

1. Sheet metal: Carbon steel, 12-gauge minimum thickness, hot-dip galvanized after fabrication.

2. Fasteners: Type 316 stainless steel.

2.09 SHOP FINISHES
A. Manufacturer's standard primer and finish coatings.

1. Primer only if field coatings are to be applied.

2.10 GEAR MOTORS
A. Parallel shaft drives: Helical gearing.

B. Right-angle drives: Worm gearing.

C. Manufacturers: One of the following or equal:

1. Baldor Electric Company.

2. Bodine Electric Company.

2.11 GEAR REDUCTION UNITS
A. Design and performance criteria:

1. Gear type:
a. Helical or herringbone.

2. AGMA Class II service:
a. Use more severe service condition when such is recommended by unit's manufacturer.

3. Cast-iron housing with gears running in oil.

4. Anti-friction bearings.

5. Thermal horsepower rating based on maximum horsepower rating of prime mover, not actual load.

2.12 MOUNTING AND LIFTING PROVISIONS FOR EQUIPMENT
A. Equipment bases and base plates:

1. Provide equipment bases with machined support pads, dowels for alignment for mating of adjacent items, openings for electrical conduits, and openings to facilitate grouting.

2. Provide jacking screws in bases and supports for equipment and for equipment weighing 500 pounds or more.

Page 1895 of 3073 ends

Common Work Results for Mechanical Equipment
15050-11 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

3. Materials:
a. Match equipment material or steel.
b. Coating: Match equipment.

B. Steel support frames:

1. Carbon steel:
a. At exterior locations, and at interior wet or moist locations, provide continuous welds on both sides to close seams and edges between steel members.
b. Grind closure welds smooth.

C. Lifting lugs or eyes:

1. Equipment units weighing 50 pounds or more:
a. Provide with lifting lugs or eyes to allow removal with lifting device.

2.13 SPRING VIBRATION ISOLATORS
A. Design requirements:

1. Telescopic top and bottom housing with vertical stabilizers to resist lateral and vertical forces.

2. Use steel coil springs.

3. Design vibration isolators in accordance with seismic design criteria as specified in Section 01850 - Design Criteria.

B. Performance requirements: Minimum spring deflection of 1-inch under static load and capable of limiting transmissibility to 10 percent maximum at design operating load.

C. Manufacturers: One of the following or equal:

1. California Dynamics Corporation, Type RJSD.

2. Mason Industries, equivalent product.

D. Materials:

1. Fabricate isolators using welded-steel or shatterproof ductile iron in accordance with ASTM A536 Grade CS-45-12.

2. Spring steel: ASTM A125.

2.14 NAMEPLATES
A. Fastened to equipment at factory in an accessible and visible location.

B. Metal engraved or stamped with text, holes drilled or punched for fasteners.

C. Material: Aluminum or stainless steel.

D. Fasteners: Number 4 or larger oval head stainless steel screws or drive pins.

E. Text:

1. Manufacturer’s name, equipment model number, equipment serial number, and identification tag number.

2. Additional items indicated in the Technical Sections.

Page 1896 of 3073 ends

Common Work Results for Mechanical Equipment
15050-12 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

3. Indicate the following additional information as applicable:
a. Maximum and normal rotating speed.
b. Service class per applicable standards.

4. Include for pumps:
a. Rated total dynamic head in feet of fluid.
b. Rated flow in gallons per minute.
c. Impeller, gear, screw, diaphragm, or piston size.

5. Include for motors:
a. Drive speed.
b. Motor horsepower with rated capacity.

6. Include for gear reduction units:
a. AGMA class of service.
b. Service factor.
c. Input and output speeds.

2.15 PUMP SHAFT COUPLINGS
A. General:

1. Type and ratings: Non-lubricated designed for not less than 50,000 hours of operating life.

2. Sizes: Provide as recommended by manufacturer for specific application, considering horsepower, speed of rotation, balance, and type of service.

3. Suitable for an ambient temperature range between -40 degrees to +200 degrees Fahrenheit.

B. Close-couplings for electric-motor-driven equipment:

1. Manufacturers: One of the following or equal:
a. Lovejoy.
b. T.B. Woods.

2. Provide flexible couplings designed to accommodate angular misalignment, parallel misalignment, and end float.

3. Manufacture flexible component of coupling from synthetic rubber or urethane.

4. Provide service factor of 2.5 for electric motor drives and 3.5 for engine drives.

5. Do not allow metal-to-metal contact between driver and driven equipment.

C. Flexible couplings for direct connected electric-motor-driven equipment:

1. Manufacturers: One of the following or equal:
a. Rexnord.
b. T.B. Woods.

2. Provide flexible couplings designed to accommodate shock loading, vibration, and shaft misalignment or offset.

3. Provide flexible connecting element of rubber and reinforcement fibers.

4. Provide service factor of 2.0.

5. Connect stub shafts through collars or round flanges, firmly keyed to their shafts with neoprene cylinders held to individual flanges by through pins.

D. Spacer couplings:

1. Where cartridge-type mechanical seals or non-split seals are specified, provide a spacer-type coupling of sufficient length to remove the seal without disturbing the driver or driven equipment.

Page 1897 of 3073 ends

Common Work Results for Mechanical Equipment
15050-13 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

2.16 PUMP SEAL CHAMBER AND SEALS
A. Seal chamber (stuffing box):

1. Large enough to retrofit with double mechanical seal.

B. Seal Types: Based on the following and as specified in the Technical Section:

1. Type 1: Packing:
a. Provide when specified in the Technical Section for wastewater, non-potable water, and sludge applications:
1) Asbestos free.
2) PTFE (Teflon™) free.
3) Braided graphite.
4) Manufacturers: One of the following or equal:
a) Chesterton, 1400.
b) John Crane.
b. Provide when specified for drinking water service:
1) Asbestos free.
2) Material: Braided PTFE (Teflon™).
3) Manufacturers: One of the following or equal:
a) Chesterton, 1725.
b) John Crane.
c. Design:
1) Packing gland to allow adjustment and repacking without dismantling pump except to open up stuffing box.
2) Seal chamber (stuffing box) large enough to retrofit with double mechanical seal.
3) Manufacturers: One of the following or equal:
a) Chesterton, 1725.
b) John Crane.

2. Type 2: Mechanical seal, flushing, cartridge, single O-ring. a. Manufacturers: One of the following or equal:
1) Chesterton, S10.
2) John Crane, 5610 Series.

3. Type 3: Mechanical seal, flushing, cartridge, double O-ring:
a. Manufacturers: One of the following or equal:
1) Chesterton, S20.
2) John Crane, 5620 Series.

4. Type 4: Mechanical seal, flushing, cartridge, double split-ring:
a. Manufacturers: One of the following or equal:
1) Chesterton, S20.
2) John Crane, 5620 Series.

5. Type 5: Mechanical seal, flushing, cartridge, single split-ring:
a. Manufacturers: One of the following or equal:
1) Chesterton, 442.
2) John Crane, 5860.

6. Type 6: Mechanical seal, flushless, cartridge, single split-ring:
a. Manufacturers: One of the following or equal:
1) Chesterton, 156.
2) John Crane, 3740 Series.

Page 1898 of 3073 ends

Common Work Results for Mechanical Equipment
15050-14 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) C. Mechanical seals, Types 2 to 6:

1. Balanced hydraulically.

2. Spring:
a. Stationary, out of pumping fluid.
b. Material as specified in the Technical Section. Hastelloy C; Type Elgiloy or 17-7 PH stainless steel for split seals.

3. O-ring: Viton™ 747.

4. Gland: Type 316L stainless steel.

5. Set screws: Type 316L stainless steel.

6. Faces: Reaction bonded, silicon carbide/carbon.

7. Minimum differential pressures in either direction: 300 pounds per square inch gauge.
a. Manufacturers: One of the following or equal:
1) Chesterton, 1400.
2) John Crane, equivalent product.

8. Drinking water service:
a. Asbestos free.
b. Material: Braided PTFE (Teflon™).
c. Manufacturers: One of the following or equal:
1) Chesterton, 1725.
2) John Crane, equivalent product.

D. Flushing system:

1. Provide flushing connections:
a. 3/4-inch size.
b. Provide API Standard 682 seal water plan arrangement as specified in the Technical Section:
1) Plan 11 - Product stream seal water from discharge thru seal. 2) Plan 13 - Product stream seal water thru seal to suction. 3) Plan 23 - Closed loop seal water with cooler and pumping ring. 4) Plan 32 - Production seal water discharged to product stream. 5) Plan 54 - Production Seal Water Excluded from Product Stream.

2.17 SAFETY SIGNS
A. Material, sign size, and text: As specified in Section 10400 - Signage.

2.18 SHIPPING
A. Prior to shipment of equipment:

1. Bearings (and similar items):
a. Pack separately or provide other protection during transport. b. Greased and lubricated.

2. Gear boxes:
a. Oil filled or sprayed with rust preventive protective coating.

3. Fasteners:
a. Inspect for proper torques and tightness.

Page 1899 of 3073 ends

Common Work Results for Mechanical Equipment
15050-15 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) PART 3 EXECUTION

3.01 PRE-INSTALLATION
A. Field measurements:

1. Prior to shop drawings preparation, take measurements and verify dimensions indicated on the Drawings.

2. Ensure equipment and ancillary appurtenances fit within available space.

B. Sequencing and scheduling:

1. Coordinate details of equipment with other related parts of the Work, including verification that structures, piping, wiring, and equipment components are compatible.

2. Equipment anchoring: Obtain anchoring material and setting drawings from equipment manufacturers in adequate time for templates to be constructed and anchors to be cast-in-place.

3.02 LUBRICATION LINES AND FITTINGS
A. Support and protect lines from source to point of use.

B. Fittings:

1. Bring fittings to outside of equipment in manner such that they are readily accessible from outside without necessity of removing covers, plates, housings, or guards.

2. Mount fittings together wherever possible using factory-mounted multiple fitting assemblies securely mounted, parallel with equipment lines, and protected from damage.

3. Fittings for underwater bearings: Bring fittings above water surface and mount on edge of structure above.

3.03 ALIGNMENT OF DRIVERS AND EQUIPMENT
A. Where drive motors or other drivers are connected to driven equipment by flexible coupling, disconnect coupling halves and align driver and equipment after driven equipment has been leveled on its foundation.

B. Comply with procedures of appropriate HI, AGMA Standards, alignment tolerances of equipment manufacturers and the following requirements to bring components into angular and parallel alignment:

1. Maximum total coupling offset (not the per-plane offset): Not to exceed

0.5 mils per inch of coupling length for spacer couplings based on coupling length (not dial separation).

2. Utilize jacking screws, wedges, or shims as recommended by the equipment manufacturer and as specified in the equipment sections.

C. Use reverse-indicator arrangement dial-type or laser-type alignment indicators:

Mount indicators on the driver/coupling flange and equipment/coupling flange.

Alignment instrumentation accuracy shall be sufficient to read angular and radial misalignment at 10 percent or less of the manufacturer's recommended acceptable misalignment.

Page 1900 of 3073 ends

Common Work Results for Mechanical Equipment
15050-16 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) D. Alignment and calculations shall include measurement and allowance for thermal growth, spacer coupling length, indicator separation, and axial spacing tolerances of the coupling.

E. When alignment satisfies most stringent tolerance of system components, grout between base and foundation.

1. Allow minimum 48 hours for grout to harden.

2. After grout hardens, remove jacking screws, tighten anchor bolts and other connections, and recheck alignment.

3. Correct alignment as required.

3.04 EQUIPMENT SUPPORT AND ANCHORING TO STRUCTURES
A. Anchor equipment to structures as indicated on the Drawings and as specified.

B. Obtain final anchor bolt layouts for equipment prior to:

1. Detailing reinforcement for equipment pads.

2. Preparation of shop drawings for metal structures supporting equipment.

C. Anchor bolt templates:

1. Provide templates as specified in the Technical Sections.

2. Use final anchor bolt layout to construct templates for setting anchor bolts.

3. Make templates:
a. Rigid, and non-deformable during use.
b. With longitudinal axes of anchors parallel.
c. With longitudinal axes of anchors perpendicular to surface supporting the equipment.

4. Templates may be reused for multiple locations of the same equipment only if:
a. Templates are in "like-new" condition prior to each reuse. b. The anchor layout has not been deformed or damaged by previous installation, removal, or handling of templates.

5. Sequence:
a. Set and support templates prior construction of structures surrounding anchors.
b. Position anchors in templates to provide designated embedment in supporting structure, with required projection for installation of grout, base plates, and hardware for tightening.
c. Construct concrete or masonry around anchors using methods that preserve required anchor positions and alignment, and clearances to edges of supports or structures.

D. Anchor adjustment sleeves:

1. Use of adjustment sleeves around anchors:
a. Is at the option of the Contractor.
b. Does not relieve Contractor of obligation to construct and use templates for setting of anchors.
c. May required increased anchor embedment length to develop the strength of the anchor in the embedded length below the adjustment sleeve.

2. Submittal requirements for anchor adjustment sleeves:
a. Provide within sufficient time for Engineer approval and not less than 10 working days before setting those items.

Page 1901 of 3073 ends

Common Work Results for Mechanical Equipment
15050-17 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal) b. Proposed locations of sleeves.
c. Details and dimensions of sleeves.
d. Sleeve materials of construction, and coatings.
e. Information on sleeve filler material and means of filler removal. f. Type, details, and dimensions of anchor bolts or anchor rods to be used with sleeves.
g. Calculations showing development of anchor load capacity below the bottom of the sleeve.
h. Plan for removal of sleeve fillers, if any.
i. Plan for placement and consolidation of flowable grout inside sleeves and to a level equal to top of concrete slab or equipment pad surrounding the sleeve.

3.05 GROUTING UNDER EQUIPMENT BASES, BASE PLATES, SOLE PLATES, AND SKIDS
A. General:

1. Comply with equipment manufacturer's installation instructions including:
a. Tolerances for level.
b. Tolerances for vertical and horizontal alignment.
c. Requirements or recommendations for grouting spaces and grout installation.
d. Recommendations for tightening of equipment anchors after grout has cured.

2. Install equipment over grout as indicated on the Drawings or specified only after:
a. Equipment is leveled and in proper alignment.
b. Piping connections are complete and in alignment with no strain transmitted to equipment.

3. Install flowable grout, as specified in Section 03600 - Grouting, placed with forms and head boxes.
a. Use flowable, non-shrink grout.
b. Use flowable, non-shrink epoxy grout, only where indicated on the Drawings, where specified in Technical Sections, or when approved in advance by the Engineer.
c. Grouting with dry-pack materials is not permitted.

B. Prepare equipment bases, base plates, soleplates, and skids for grouting:

1. Concrete equipment bases:
a. Roughen surface in accordance with ICRI, Guideline No. 310.2R, Surface Preparation Profiles CSP-3 and CSP-4.
b. Clean roughened concrete surfaces:

2. Base plates, soleplates, and skids:
a. Clean surfaces in accordance with SSPC-SP-1-Solvent Cleaning, to remove dirt, dust, oil, grease, paint, and other material.

C. Level equipment for grouting:

1. Use removable jack screws, or removable steel wedges and shims to support and level equipment bases, base plates, sole plates, and skids. a. Do not use leveling nuts placed on equipment anchors to support or level equipment bases, base plates, sole plates, and skids.

Page 1902 of 3073 ends

Common Work Results for Mechanical Equipment
15050-18 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

2. Removable jack screws:
a. Provide number, size, and locations of jack screws required to support and level equipment in accordance with manufacturer's
recommendations.
b. Drill and tap equipment base plates, sole plates, and skids for jack screws.
c. Support jack screws on circular steel plates that have been epoxy bonded to the equipment foundation.
1) Provide plates fabricated from Type 316 stainless steel where edges of support plates will have grout side cover of 3 inches or less in the finished work.
d. Make provision for removal of jack screws after grouting:
1) Prevent grout from bonding to jack screws by wrapping jack screw threads that will be in contact with grout with multiple layers of tape or other material acceptable to Engineer.
e. Place and cure grout.
f. After grout is placed and cured:
1) Remove jack screws and material used to prevent grout from bonding to jack screws.
2) Provide jack screws to Owner for future use.
3) Fill jack screw holes with grout.
4) Cure grout as specified.

3. Removable steel wedges and shims:
a. Use for equipment bases, base plates, sole plates, and skids where it is not practical to use jack screws.
b. Provide number, size, and locations of wedges and shims required to support and level equipment in accordance with manufacturer's recommendations.
c. Make provision for removal of wedges and shims after grouting:
1) Prevent grout from bonding to wedges and shims by wrapping wedges and shims that contact grout with multiple layers of tape or other material acceptable to Engineer.
2) Locate and orient wedges and shims to allow for removal after grouting, and to facilitate placement of grout in the remaining voids. d. Place and cure grout.
e. After grout is placed and cured:
1) Remove wedges and shims, and material used to prevent grout from bonding to them.
2) Fill jack screw holes with grout.
3) Cure grout as specified.

D. Construct grout forms:

1. Provide forms:
a. Rigid with adequate strength to withstand placement of grout. b. With surfaces that will produce a smooth, uniform finish for grout edges exposed in the finished work.
c. That allow grout to flow horizontally beyond the perimeter of the equipment base plate a distance not less than the thickness of the grout, and not less than 1 inch.

Page 1903 of 3073 ends

Common Work Results for Mechanical Equipment
15050-19 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15050 (BidSetFinal)

2. Install forms:
a. Seal form cracks and joints with elastomeric sealant to make form watertight.
b. Line form surfaces in contact with grout with polyethylene film, or coat with 2 coats of heavy-duty paste wax.

3. Construct grout "head box" over entire length of one side of form. a. Make head box height sufficient to force grout to flow under full dimensions of equipment base and to the surrounding form faces.

E. Pre-grouting procedures:

1. Concrete surfaces receiving flowable, non-shrink grout:
a. Saturate concrete surface in contact with grout and concrete surfaces extending not less than least 6 inches beyond limits of grout with clean water for a minimum of 24 hours prior to grouting.
b. Just prior to grout placement, remove standing water using clean rags or oil-free compressed air. Provide "saturated surface dry" (SSD) concrete for grout placement.

2. Concrete surfaces receiving flowable, non-shrink epoxy grout:
a. Do not saturate concrete prior to grout placement.

F. Grout placement and curing:

1. Place and cure grout as specified in Section 03600 - Grouting, and in this Section.

2. Grouting:
a. Keep level of grout in head box above bottom of equipment bases, base plates, sole plates, and skids always to drive flow under base. b. Maintain continuous grout flow from head box to opposite sides of forms without trapping air or forming voids.
c. Vibrate, rod, or chain grout to facilitate grout flow, to consolidate grout, and to remove entrapped air.

3. After grout sets, remove forms and trim grout edges at 45-degree angle from bottom edge of equipment bases, base plates, sole plates, and skids.

4. Cure grout as specified in Section 03600 - Grouting.

G. After grout is cured:

1. Remove jack screws or wedges and shims, and material used to prevent grout from bonding to leveling devices.

2. Fill pockets from removed leveling devices with grout.

3. Cure filled voids as specified in Section 03600 - Grouting.

4. Tighten equipment anchors in accordance with equipment manufacturer requirements.

3.06 FIELD FINISHES
A. When touchup or repair is required, apply primer and coating systems as recommended by the equipment manufacturer.

END OF SECTION

Page 1904 of 3073 ends
Page 1905 of 3073 ends

Common Work Results For General Piping
15052-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) SECTION 15052

COMMON WORK RESULTS FOR GENERAL PIPING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Basic materials and methods for metallic and plastic piping systems.

1.02 REFERENCES
A. American Society of Mechanical Engineers (ASME):

1. B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 Through 24.

2. B16.47 - Large Diameter Steel Flanges: NPS 26 Through NPS 60 Metric/Inch Standard.

B. American Water Work Association (AWWA):

1. C11 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe.

2. C105 - Polyethylene Encasement for Ductile-Iron Pipe Systems.

3. C151 - Ductile-Iron Pipe, Centrifugally Cast.

4. C207 - Standard for Steel Pipe Flanges for Waterworks Services-Size 4 In.

Through 144 In.

C. ASTM International (ASTM):

1. A74 - Standard Specification for Cast Iron Soil Pipe and Fittings.

2. A193 - Standard Specification for Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications.

3. A194 - Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both.

4. A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60,000 PSI Tensile Strength.

5. A320 - Standard Specification for Alloy-Steel and Stainless Steel Bolting for Low-Temperature Service.

6. A563 - Standard Specification for Carbon and Alloy Steel Nuts.

7. B88 - Standard Specification for Seamless Copper Water Tube.

8. D2000 - Standard Classification System for Rubber Products in Automotive Applications.

9. D2513 - Standard Specification for Polyethylene (PE) Gas Pressure Pipe, Tubing and Fittings.

10. F37 - Standard Test Methods for Sealability of Gasket Materials.

11. F2329 - Standard Specification for Zinc Coating, Hot-Dip, Requirements of Application to Carbon and Alloy Steel Bolts, Screws, Washers, Nuts, and Special Threaded Fasteners.

Page 1906 of 3073 ends

Common Work Results For General Piping
15052-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) D. California Health and Safety Code.

E. NSF International (NSF):

1. 61 - Drinking Water System Components - Health. Effects.

1.03 DEFINITIONS
A. Buried pipes: Pipes that are buried in the soil with or without a concrete pipe encasement.

B. Exposed pipe: Pipes that are located above ground, or located inside a structure, supported by a structure, or cast into a concrete structure.

C. Underground pipes: Buried pipes - see A. above.

D. Underwater pipes: Pipes below the top of walls in basins or tanks containing water.

E. Wet wall: A wall with water on at least 1 side.

F. Pipes adjacent to a wet wall: Pipe centerline within 10 inches of the wet wall.

PART 2 PRODUCTS

2.01 GENERAL
A. Materials as specified in Section 01600 - Product Requirements including special requirements for materials in contact with drinking water.

2.02 LINK TYPE SEALS
A. Characteristics:

1. Modular mechanical type, consisting of interlocking neoprene or synthetic rubber links shaped to continuously fill the annular space between the pipe and wall opening.

2. Links to form a continuous rubber belt around the pipe.

3. Provide a nylon polymer pressure plate with Type 316 stainless steel hardware. Isolate pressure plate from contact with wall sleeve.

4. Hardware to be Type 316 stainless steel.
a. Provide anti-galling lubricant for threads.

B. One of the following or equal:

1. Link-Seal.

2. Pipe Linx.

2.03 FLANGE BOLTS AND NUTS
A. General:

1. Washer:
a. Provide a washer for each nut.
b. Washer shall be of the same material as the nut.

Page 1907 of 3073 ends

Common Work Results For General Piping
15052-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

2. Nuts: Heavy hex-head.

3. Cut and finish flange bolts to project:
a. Face of the bolt shall exceed face of nut by 1/8 inch minimum. b. A maximum of 1/4 inch beyond outside face of nut after assembly.

4. Tap holes for cap screws or stud bolts when used.

5. Lubricant for stainless steel bolts and nuts:
a. Chloride-free.
b. Manufacturers: One of the following or equal:
1) Huskey FG-1800 Anti-Seize.
2) Weicon Anti-Seize High-Tech.

B. Ductile iron pipe:

1. On exposed pipes with pressures equal to or less than 150 pounds per square inch gauge (psig):
a. Bolts: In accordance with ASTM A307, Grade B.
b. Nuts: In accordance with ASTM A563, Grade A.
c. Bolts and Nuts: Hot-dip galvanized in accordance with ASTM F2329.

2. On exposed pipes with pressures greater than 150 psig:
a. Bolts: In accordance with ASTM A193, Grade B7.
b. Nuts: In accordance with ASTM A194, Grade 2H.
c. Bolts and nuts: Hot-dip galvanized in accordance with ASTM F2329.

3. On underwater pipes and pipes adjacent to wet walls:
a. Bolts: In accordance with ASTM A193, Grade B8M.
b. Nuts: In accordance with ASTM A194, Grade 8M.

C. Plastic pipe:

1. On exposed pipes:
a. Bolts: In accordance with ASTM A307, Grade B.
b. Nuts: In accordance with ASTM A563, Grade A.
c. Bolts and Nuts: Hot-dip galvanized in accordance with ASTM F2329.

2. On underwater pipes and pipes adjacent to wet walls:
a. Bolts: In accordance with ASTM A193, Grade B8M.
b. Nuts: In accordance with ASTM A194, Grade 8M.

D. Steel pipe:

1. On exposed pipes:
a. For ASME B16.5 Class 150 flanges and AWWA C207 Class D flanges:
1) Bolts: In accordance with ASTM A307, Grade B.
2) Nuts: In accordance with ASTM A563, Grade A.
3) Bolts and Nuts: Hot-dip galvanized in accordance with ASTM F2329. b. For ASME B16.5 and B16.47 Class 300 flanges and AWWA C207 Class E and F flanges:
1) Bolts: In accordance with ASTM A193, Grade B7.
2) Nuts: In accordance with ASTM A194, Grade 2H.

2. On underwater pipes and pipes adjacent to wet walls:
a. Bolts: In accordance with ASTM A193, Grade B8M.
b. Nuts: In accordance with ASTM A194, Grade 8M.

3. Low-temperature service: Stainless steel, Type 316:
a. Bolts: In accordance with ASTM A320, Grade B8M, Class 1, heavy hex. b. Nuts: In accordance with ASTM A194, Grade B8M, heavy hex. c. Washers: Alloy group matching bolts and nuts.

Page 1908 of 3073 ends

Common Work Results For General Piping
15052-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

4. High-temperature service or high-pressure service: Stainless steel, Type 316:
a. Bolts: In accordance with ASTM A193, Grade B8M, Class 1, heavy hex. b. Nuts: In accordance with ASTM A194, Grade 8, heavy hex. c. Washers: Alloy group matching bolts and nuts.

2.04 MECHANICAL JOINTS BOLTS AND NUTS
A. Bolts including T-Bolts:

1. High strength low alloy steel in accordance with AWWA C111.

B. Heavy Hex Nuts:

1. High strength low alloy steel in accordance with AWWA C111.

2.05 GASKETS
A. General.

1. Gaskets shall be suitable for the specific fluids, pressure, and temperature conditions.

2. Capable of being applied on surface of piping with cavities to provide for an improved seal with the internal piping pressure.

B. Gaskets for flanged joints in ductile iron and steel piping for sewage service:

1. Suitable for pressures equal and less than 150 pounds per square inch gauge, temperatures equal and less than 250 degrees Fahrenheit, and raw sewage service.

2. Gasket material:
a. SBR or neoprene elastomer with minimum Shore A hardness value of 70. b. Reinforcement: Cloth or synthetic fiber.
c. Thickness: Minimum 3/32-inch thick for less than 10-inch pipe; minimum 1/8 inch thick for 10-inch and larger pipe.

3. Manufacturers: One of the following or equal:
a. Pipe less than 48 inches in diameter:
1) Garlock, Style 7797.
2) John Crane, similar product.
b. Pipe 48 inches in diameter and larger:
1) Garlock, Style 3760.
2) John Crane, similar product.

C. Gaskets for flanged joints in polyvinyl chloride and polyethylene piping:

1. Suitable for pressures equal to and less than 150 pounds per square inch gauge, with low flange bolt loadings, temperatures equal to and less than 120 degrees Fahrenheit, and polymer, chlorine, caustic solutions, and other chemicals, except chemicals which liberate free fluorine including fluorochemicals and gaseous fluorine.

2. Material:
a. Chemical systems: 0.125-inch thick Viton™ rubber.
b. Sewer and water: 0.125-inch thick SBR.

3. Manufacturers: One of the following or equal:
a. Garlock.
b. John Crane, similar product.

Page 1909 of 3073 ends

Common Work Results For General Piping
15052-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) D. Gaskets for flanged joints in low pressure air piping:

1. Suitable for pressures equal to and less than 150 pounds per square inch gauge, temperatures equal to and less than 300 degrees Fahrenheit, and compressed air service.

2. Material: EPDM elastomer, 1/8-inch thick, 60 Shore hardness, smooth surface.

3. Manufacturers: One of the following or equal:
a. Garlock, Style 8314.
b. John Crane, similar product.

E. Gaskets for flanged joints in ductile iron or steel water piping:

1. Suitable for hot or cold water, pressures equal to and less than 150 pounds per square inch gauge, and temperatures equal to and less than 160 degrees Fahrenheit.

2. Material:
a. SBR or neoprene elastomer, compressed, with non-asbestos fiber reinforcement.

3. Manufacturers: One of the following or equal:
a. Garlock, Bluegard 3300.
b. John Crane, similar product.

F. Gaskets for flanged joints in ductile iron or steel drinking water piping meeting NSF 61 requirements:

1. Suitable for hot or cold water, pressures equal to or less than 150 pounds per square inch gauge, and temperatures equal to or less than 160 degrees Fahrenheit.

2. Material:
a. EPDM material with 80 Shore A durometer rating.

3. Manufacturers: One of the following or equal:
a. Garlock, 98206.
b. John Crane, similar product.

PART 3 EXECUTION

3.01 INSTALLATION
A. General:

1. Piping drawings:
a. Except in details, piping is indicated diagrammatically. Not every offset and fitting, or structural difficulty that may be encountered has been indicated on the Drawings. Sizes and locations are indicated on the Drawings.
b. Perform minor modifications to piping alignment where necessary to avoid structural, mechanical, or other type of obstructions that cannot be removed or changed.
1) Modifications are intended to be of minor scope, not involving a change to the design concept or a change to the Contract Price or Contract Times.

2. Piping alternatives:
a. Provide piping as specified in this Section, unless indicated on the Drawings or specified otherwise.

Page 1910 of 3073 ends

Common Work Results For General Piping
15052-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) b. Alternative pipe ratings:
1) Piping with greater pressure rating than specified may be substituted in lieu of specified piping without changes to the Contract Price. 2) Piping of different material may not be substituted in lieu of specified piping.
c. Valves in piping sections: Capable of withstanding specified test pressures for piping sections and fabricated with ends to fit piping. d. Grooved joints: Use couplings, flange adapters, and fittings of the same manufacturer.
1) Manufacturer’s factory trained representative:
a) Provide on-site training for Contractor’s field personnel. b) Periodically visit the jobsite to verify Contractor is following best recommended practices.
2) Distributor’s representative is not considered qualified to conduct the training or jobsite visits.
e. Flanged joints: where 1 of the joining flanges is raised face type, provide a matching raised face type flange for the other joining flange.

3. Unless otherwise indicated on the Drawings, piping at pipe joints, fittings, couplings, and equipment shall be installed without rotation, angular deflection, vertical offset, or horizontal offset.

B. Wall and slab penetrations:

1. Provide sleeves for piping penetrations through aboveground masonry and concrete walls, floors, ceilings, roofs, unless specified or otherwise indicated on the Drawings.

2. For piping 1 inch in nominal diameter and larger, provide sleeves with minimum inside diameters of 1 inch plus outside diameter of piping. For piping smaller than 1 inch in nominal diameter, provide sleeve of minimum twice the outside diameter of piping.
a. Arrange sleeves and adjacent joints so piping can be pulled out of sleeves and replaced without disturbing the structure.
b. Cut ends of sleeves flush with surfaces of concrete, masonry, or plaster. c. Conceal ends of sleeves with escutcheons where piping runs through floors, walls, or ceilings of finished spaces within buildings. d. Seal spaces between pipes and sleeves with link-type seals when not otherwise specified or indicated on the Drawings.

3. Provide flexibility in piping connecting to structures to accommodate movement due to soil settlement and earthquakes. Provide flexibility using details indicated on the Drawings.

4. Core drilled openings:
a. Do not damage or cut existing reinforcing bars, electrical conduits, or other items embedded in the existing concrete without acceptance by Engineer.
b. Determine location of reinforcing bars or other obstructions with a non-destructive indicator device.
c. Remove dust and debris from hole using compressed air.

Page 1911 of 3073 ends

Common Work Results For General Piping
15052-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) C. Exposed piping:

1. Install exposed piping in straight runs parallel to the axes of structures, unless otherwise indicated on the Drawings:
a. Install piping runs plumb and level, unless otherwise indicated on the Drawings.
1) Slope plumbing drain piping with a minimum of 1/4-inch per foot downward in the direction of flow.

2. Install exposed piping after installing equipment and after piping and fitting locations have been determined.

3. Support piping: As specified in Sections 15061 - Pipe Supports, 15062 - Preformed Channel Pipe Support System, and 15063 - Non-Metallic Pipe Support System:
a. Do not transfer pipe loads and strain to equipment.

4. In addition to the joints indicated on the Drawings, provide unions, flexible couplings, flanged joints, flanged coupling adapters, and other types of joints or means which are compatible with and suitable for the piping system, and necessary to allow ready assembly and disassembly of the piping.

5. Assemble piping without distortion or stresses caused by misalignment:
a. Match and properly orient flanges, unions, flexible couplings, and other connections.
b. Do not subject piping to bending or other undue stresses when fitting piping.
c. Do not correct defective orientation or alignment by distorting flanged joints or subjecting flange bolts to bending or other undue stresses. d. Flange bolts, union halves, flexible connectors, and other connection elements shall slip freely into place.
e. Alter piping assembly to fit when proper fit is not obtained. f. Install eccentric reducers or increasers with the top horizontal for pump suction piping.

D. Buried piping:

1. Bury piping with minimum 4-foot cover without air traps, unless otherwise indicated on the Drawings.

2. Where 2 similar services run parallel to each other, piping for such services may be laid in the same trench.
a. Lay piping with sufficient room for assembly and disassembly of joints, for thrust blocks, for other structures, and to meet separation requirements of public health authorities having jurisdiction.

3. Laying piping:
a. Lay piping in finished trenches free from water or debris. Begin at the lowest point with bell ends up slope.
b. Place piping with top or bottom markings with markings in proper position. c. Lay piping on an unyielding foundation with uniform bearing under the full length of barrels.
d. Where joints require external grouting, banding, or pointing, provide space under and immediately in front of the bell end of each section laid with sufficient shape and size for grouting, banding, or pointing of joints. e. At the end of each day's construction, plug open ends of piping temporarily to prevent entrance of debris or animals.

Page 1912 of 3073 ends

Common Work Results For General Piping
15052-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal) E. Venting piping under pressure:

1. Lay piping under pressure flat or at a continuous slope without air traps, unless otherwise indicated on the Drawings.

2. Install plug valves as air bleeder cocks at high points in piping. a. Provide 1-inch plug valves for water lines, and 2-inch plug valves for sewage and sludge lines, unless otherwise indicated on the Drawings.

3. Provide additional pipe taps with plug cocks and riser pipes along piping as required for venting during initial filling, disinfecting, and sampling.

4. Before piping is placed into service, close plug valves and install plugs. Protect plugs and plug valves from corrosion in as specified in Section 09960 - High-Performance Coatings.

F. Restraining buried piping:

1. Restrain piping at valves and at fittings where piping changes direction, changes sizes, and at ends:
a. When piping is underground, use concrete thrust blocks, mechanical restraints, or push-on restraints.
b. Determine thrust forces by multiplying the nominal cross-sectional area of the piping by design test pressure of the piping.

2. Provide restraints with ample size to withstand thrust forces resulting from test pressures:
a. During testing, provide suitable temporary restraints where piping does not require permanent restraints.

3. Place concrete thrust blocks against undisturbed soil.

4. Place concrete so piping joints, fittings, and other appurtenances are accessible for assembly and disassembly.

5. Provide underground mechanical restraints where specified in Attachment A - Piping Schedule.

G. Restraining above ground piping:

1. Restrain piping at valves and at fittings where piping changes direction, changes sizes, and at ends:
a. When piping is aboveground or underwater, use mechanical or structural restraints.
b. Determine thrust forces by multiplying the nominal cross-sectional area of the piping by design test pressure of the piping.

2. Provide restraints with ample size to withstand thrust forces resulting from test pressures:
a. During testing, provide suitable temporary restraints where piping does not require permanent restraints.

H. Connections to existing piping:

1. Expose existing piping to which connections are to be made with sufficient time to permit, where necessary, field adjustments in line, grade, or fittings:
a. Protect domestic water/potable water supplies from contamination:
1) Make connections between domestic water supply and other water systems in accordance with requirements of public health authorities. 2) Provide devices approved by Owner of domestic water supply system to prevent flow from other sources into the domestic supply system.

Page 1913 of 3073 ends

Common Work Results For General Piping
15052-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

2. Make connections to existing piping and valves after sections of new piping to be connected have been tested and found satisfactory.

3. Provide sleeves, flanges, nipples, couplings, adapters, and other fittings needed to install or attach new fittings to existing piping and to make connections to existing piping.

4. For flanged connections, provide stainless steel bolts with isolation bushings and washers, and full-face flange gaskets.

I. Connections between ferrous and nonferrous metals:

1. Connect ferrous and nonferrous metal piping, tubing, and fittings with dielectric couplings especially designed for the prevention of chemical reactions between dissimilar metals.

2. Nonferrous metals include aluminum, copper, and copper alloys.

J. Flanged connections between dissimilar metals such as ductile iron pipe and steel pipe:

1. Provide stainless steel bolts with isolation bushings and washers, and full-face flange gaskets.

3.02 CLEANING
A. Piping cleaning:

1. Upon completion of installation, clean piping interior of foreign matter and debris.

2. Perform special cleaning when required by the Contract Documents.

B. Conduct pressure and leak test, as specified.

3.03 PIPING SCHEDULE
A. As specified in Attachment A - Piping Schedule.

END OF SECTION

Page 1914 of 3073 ends
Page 1915 of 3073 ends

Common Work Results For General Piping
15052-Attachment A 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

ATTACHMENT A - PIPING SCHEDULE

Page 1916 of 3073 ends
Page 1917 of 3073 ends

Common Work Results For General Piping
15052-Attachment A-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

PIPING SCHEDULE
Process
Abbrev. Service
Nominal
Diameter
(inches) Material
Pressure Class
Special
Thickness Class
Schedule Wall
Thickness
Pipe Spec.

Section
Joints/
Fittings
Test
Pressure/
Method Lining Coating
Service
Conditions Comments
AA Aeration Air
Exposed 4-14 Type 304L
SST SCH 10S
15286 -
Stainless
Steel Pipe
WLD or
FL, FL
where
shown
25 psig/AM None None Insulated per
Section 15082
BW Backwash
Exposed 8-14 DIP 150
15211 -
Ductile Iron
Pipe:

AWWA C151
FL 120 psig/HH CM EPU-M-1
FC Ferric Chloride
Exposed 0.5-3 CPVC SCH 80
15230 -
Plastic Piping
and Tubing
SW 120 psig/HH None None
FE Final Effluent
Buried < 4 CPVC SCH 80
15230 -
Plastic Piping
and Tubing
SW 120 psig/HH None None
Exposed < 4 CPVC SCH 80
15230 -
Plastic Piping
and Tubing
SW 120 psig/HH None None
Submerged < 4 CPVC SCH 80
15230 -
Plastic Piping
and Tubing
SW 120 psig/HH None None

Page 1918 of 3073 ends

Common Work Results For General Piping
15052-Attachment A-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

PIPING SCHEDULE
Process
Abbrev. Service
Nominal
Diameter
(inches) Material
Pressure Class
Special
Thickness Class
Schedule Wall
Thickness
Pipe Spec.

Section
Joints/
Fittings
Test
Pressure/
Method Lining Coating
Service
Conditions Comments
SE Secondary
Effluent
Buried 10-16 PVC C900 DR-25
15244 -
Polyvinyl
Chloride
(PVC) Pipe:

Pressure
Push on
Mech
Rest.
120 psig/HH None None As Shown on
Drawings
Buried 10-16 DIP 150
15211 -
Ductile Iron
Pipe:

AWWA C151
RPO 120 psig/HH CM
EPX-M-6-BG
and
1 layer
V-Bio
As Shown on
Drawings
Exposed 12-16 DIP 150
15211 -
Ductile Iron
Pipe:

AWWA C151
FL 120 psig/HH CM EPU-M-1 As Shown on
Drawings

Page 1919 of 3073 ends

Common Work Results For General Piping
15052-Attachment A-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15052 (BidSetFinal)

PIPING SCHEDULE
Process
Abbrev. Service
Nominal
Diameter
(inches) Material
Pressure Class
Special
Thickness Class
Schedule Wall
Thickness
Pipe Spec.

Section
Joints/
Fittings
Test
Pressure/
Method Lining Coating
Service
Conditions Comments
SL Sludge
Buried 6 DIP 150
15211 -
Ductile Iron
Pipe:

AWWA C151
RPO 120 psig/HH CE
EPX-M-6-BG
and
1 layer
V-Bio
Abbreviations:

1. The following abbreviations used in the column of test method refer to the respective methods as specified in Section 15956 - Piping Systems Testing.

AM Air method
GR Gravity method
HH High head method
LH Low head method
SC Special case

2. Abbreviations to designate piping include the following:

B&SP Bell and spigot
BSP Black Steel Pipe
CE Ceramic epoxy lining
CI Cast iron
CISP Cast iron soil pipe
CL Class, followed by the designation
CM Cement mortar
CTP Coal tar pitch
DIP Ductile iron piping
EPP Epoxy polyurethane coating
FL Flange
GA Gauge, preceded by the designation GEGrooved end joint GL Glass lined
GSP Galvanized steel pipe
MJ Mechanical joint
MWA Mechanical wedge action
NPS Nominal pipe size, followed by the number in inches psi pounds per square inch
psig pounds per square inch gauge
PE Polyethylene
PEE Polyethylene encasement
PTW Polyethylene tape wrap
PVC Polyvinyl Chloride
RPO Restrained push-on
SCH Schedule, followed by the designation
SCRD Screwed-On
SST Stainless steel
STP Steel pipe
SW Solvent welded
VCP Vitrified clay piping
WLD Weld

Page 1920 of 3073 ends
Page 1921 of 3073 ends

Pipe Supports
15061-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) SECTION 15061

PIPE SUPPORTS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Supports for pipe, fittings, valves, and appurtenances.

1.02 REFERENCES
A. ASTM International (ASTM):

1. A123 - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products.

2. A380 - Standard Practice for Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems.

3. A967 - Standard Specification for Chemical Passivation Treatments for Stainless Steel Parts.

B. Manufacturer's Standardization Society (MSS):

1. SP-58 - Pipe Hangers and Supports - Materials, Design, and Manufacture.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures B. Product data:

1. Design features.

2. Load capacities.

3. Material designations by UNS alloy number or ASTM Specification and Grade.

4. Data needed to verify compliance with the Specifications.

5. Catalog data.

6. Clearly mark submittal information to show specific items, materials, and accessories or options being furnished.

1.04 WARRANTY
A. Provide warranty as specified in Section 01783 - Warranties and Bonds.

PART 2 PRODUCTS

2.01 GENERAL
A. As specified in Section 01600 - Product Requirements.

Page 1922 of 3073 ends

Pipe Supports
15061-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal)

2.02 MATERIALS
A. General:

1. Hot dip galvanized:
a. Fabricate as specified in Section 05120 - Structural Steel Framing. b. Hot dip after fabrication of support in accordance with ASTM A123. c. Repair galvanized surface as specified in Section 05120 - Structural Steel Framing.

2. Stainless steel:
a. Fabricate as specified in Section 05120 - Structural Steel Framing. b. Finish requirements: Remove free iron, heat tint oxides, weld scale, and other impurities, and obtain a passive finished surface. c. At the shop, perform pickling and passivation on all surfaces inside and out in accordance with ASTM A380 or A967.
1) Passivation treatments using citric acid are not allowed. d. Field welding is prohibited unless specifically allowed by the Owner. All field welds shall be passivated.

B. Outdoor areas: Areas exposed to the natural outdoor environment:

1. Hot Dip Galvanized.

C. Indoor areas: Areas exposed to an indoor environment including galleries and tunnels:

1. Hot Dip Galvanized.

D. Submerged, 3 feet or less above water level in a structure, or inside a water bearing structure:

1. Type 316 Stainless Steel.

E. Stainless steel piping system:

1. Type 316 Stainless Steel or Type 316L Stainless Steel.

F. Chemical containment areas and chemical piping:

1. Type 316 Stainless Steel.

G. Fasteners:

1. As specified in Section 05120 - Structural Steel Framing.

2.03 PIPE SUPPORTS
A. Hanger rods: Sized to match suspended pipe hanger, or as indicated on the Drawings:

1. Manufacturers: One of following or equal:
a. For stainless steel piping:
1) Bergen-Power, Figure 133.
2) Nibco-Tolco, Figure 103.

Page 1923 of 3073 ends

Pipe Supports
15061-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 140.
2) Bergen-Power, Figure 133.
3) Cooper B-Line Systems, Inc., Figure B3205.

B. Hanger rods, continuously threaded: Sized to match suspended pipe hanger, or as indicated on the Drawings:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Bergen-Power, Figure 94.
2) FM Stainless Fasteners.
b. For steel and ductile iron piping:
1) Anvil International, Figure 146.
2) Bergen-Power, Figure 94.

C. Eye bolts:

1. For stainless steel piping:
a. Type 316 stainless steel, welded and rated equal to full load capacity of rod.

2. For all other piping, unless indicated on the Drawings:
a. Welded and rated equal to full load capacity of rod.

D. Welded eyebolt rod:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 101.
2) FM Stainless Fasteners.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 278.
2) Bergen-Power, Figure 93.
3) Cooper B-Line Systems, Inc., Figure B3210.

E. Adjustable ring hangers: MSS SP-58, Type 7 or Type 9 (system dependent):

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 1C.I.
2) Bergen-Power, Figure 100SS.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 69.
2) Cooper B-Line Systems, Inc., Figure B3172.

F. Adjustable clevis hangers: MSS SP-58, Type 1:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Cooper B-Line Systems, Inc., Figure B3100 or B3102.
2) FM Stainless Fasteners, Figure 60.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 260 or Figure 590.
2) Bergen-Power, Figure 100.
3) Cooper B-Line Systems, Inc., Figure B3100 or B3102.

Page 1924 of 3073 ends

Pipe Supports
15061-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) G. Adjustable clevis hangers for insulated pipe: Oversize:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 1A.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 300.
2) Bergen-Power, Figure 100EL.
3) Cooper B-Line Systems, Inc. Figure B3108.

H. Single rod hangers for steam pipe: MSS SP-58, Type 43; malleable iron or steel yoke and roller hangers; swivel to allow rotation of yoke on rod:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 324.
2) Cooper B-Line Systems, Inc., Figure B3110.
3) FM Fasteners, Figure 81.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 181.
2) Cooper B-Line Systems, Inc., Figure B3110.

I. Double rod hangers for steam pipe: MSS SP-58, Type 41:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) FM Stainless Fasteners, Figure 71.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 171.
2) Cooper B-Line Systems, Inc., Figure B3114.

J. Brackets: MSS SP-58, Type 32 with back plate; rated for 1,500 pounds:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 30M.
2) Cooper B-Line Systems, Inc., Figure B3066.
3) FM Stainless Fasteners, Figure 98.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 195.
2) Cooper B-Line Systems, Inc., Figure B3066.

K. Brackets, heavy duty: MSS SP-58, Type 33 with back plate; rated for 3,000 pounds:

1. Manufacturers: One of following or equal:
a. Anvil International, Figure 199.
b. Cooper B-Line Systems, Inc., Figure B3067.

L. Standard U-bolt: MSS SP-58, Type 24:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 110.
2) Cooper B-Line Systems, Inc., Figure B3188.
3) FM Stainless Fasteners, Figure 37.

Page 1925 of 3073 ends

Pipe Supports
15061-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 137.
2) Bergen-Power, Figure 283.
3) Cooper B-Line Systems, Inc., Figure B3188.

M. Riser clamps: MSS SP-58, Type 8:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Cooper B-Line Systems, Inc., Figure B3373.
2) FM Stainless Fasteners, Figure 61.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 261.
2) Bergen-Power, Figure 126.
3) Cooper B-Line Systems, Inc., Figure B3373.

N. Pipe clamps: MSS SP-58, Type 4:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 4.
2) Cooper B-Line Systems, Inc., Figure 3140.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 212.
2) Bergen-Power, Figure 175.
3) Cooper B-Line Systems, Inc., Figure B3140.

O. Adjustable offset pipe clamp:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 4.
2) Cooper B-Line Systems, Inc., Figure B3149.
3) FM Stainless Fasteners, Figure 63.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 100.
2) Cooper B-Line Systems, Inc., Figure B3149.

P. Offset pipe clamp:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 8.
2) Cooper B-Line Systems, Inc., Figure 3148.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 103.
2) Cooper B-Line Systems, Inc., Figure B3148.

Q. Floor stand or stanchion saddles: MSS SP-58, Type 37. Provided with U-bolt hold down yokes:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 318.
2) FM Stainless Fasteners, Figure 59.

Page 1926 of 3073 ends

Pipe Supports
15061-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 259.
2) Bergen-Power, Figure 125.
3) Cooper B-Line Systems, Inc., Figure B3090.
c. Threaded pipe stand support stanchion. Match pipe support material:
1) Anvil International, Figure 63T.
2) Bergen-Power, Figure 138.
3) Cooper B-Line Systems Inc., Figure B3088ST.

R. Spring hangers:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Bergen-Power, Figure 920.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure B-268, Type G.
2) Bergen-Power, Figure 920.

S. One hole pipe clamps:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping: Engineer knows of no product. b. For all other piping:
1) Anvil International, Figure 126.
2) Carpenter & Paterson, Figure 237S.

T. Welded beam attachment: MSS SP-58, Type 22:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 304.
2) Cooper B-Line Systems, Inc., Figure 3083.
b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 66.
2) Bergen-Power, Figure 113A or 113B.
3) Cooper B-Line Systems, Inc., Figure B3083.

U. Heavy pipe clamp: MSS SP-58, Type 4:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 4H.
b. For all other piping, unless called out otherwise on the drawings:
1) Anvil International, Figure 216.
2) Bergen-Power, Figure 298.

V. PTFE pipe slide assembly: MSS SP-58, Type 35 with lateral and vertical restraint:

1. Manufacturers: One of the following or equal:
a. For stainless steel piping:
1) Nibco-Tolco, Figure 426.

Page 1927 of 3073 ends

Pipe Supports
15061-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) b. For all other piping, unless indicated on the Drawings:
1) Anvil International, Figure 257, Type 3.
2) Cooper B-Line Systems, Inc., Figure B3893.

W. Anchor bolts, concrete anchors, concrete inserts, powder-actuated fasteners, and sleeve anchors: As specified in Section 05120 - Structural Steel Framing.

2.04 THERMAL PIPE HANGER SHIELD
A. Thermal shields shall be provided at hanger, support and guide locations on pipe requiring insulation.

B. The shield shall consist of an insulation layer encircling the entire circumference of the pipe and a steel jacket encircling the insulation layer.

C. The thermal shield shall be the same thickness as the piping system insulation specified in Section 15082 - Piping Insulation.

D. The standard shield shall be used for hot systems and the vapor barrier shield shall be used for cold systems.

E. Stainless steel band clamps shall be used where specified to protect against slippage between the pipe wall and the thermal shield.

F. Standard shield:

1. Insulation:
a. Hydrous calcium silicate, high density, waterproof.
b. Compressive strength: 100 pounds per square inch average. c. Flexural strength: 75 pounds per square inch average d. K factor: 0.38 at 100 degrees Fahrenheit mean.
e. Temperature range: 20 degrees Fahrenheit to 500 degrees Fahrenheit.

2. Steel jacket:
a. The jacket shall be galvanized steel.
b. Gage shall be the manufacturer's standard supplied for the given pipe size.

3. Connection:
a. Shield shall have butt connection to pipe insulation. b. Steel jacket and insulation ends shall be flush.

G. Vapor barrier shield:

1. Insulation:
a. Hydrous calcium silicate, high density, waterproof.
b. Compressive strength: 100 pounds per square inch average. c. Flexural strength: 75 pounds per square inch average. d. K factor: 0.38 at 100 degrees Fahrenheit mean.
e. Temperature range: 20 degrees Fahrenheit to 500 degrees Fahrenheit.

H. Steel jacket:

1. The jacket shall be of galvanized steel.

2. Gage shall be the manufacturer's standard supplied for the given pipe size.

Page 1928 of 3073 ends

Pipe Supports
15061-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal) I. Connection:

1. Shield shall have butt connection to pipe insulation.

J. Insulation shall extend 1 inch each side of steel jacket for vapor tight connection to the pipe insulation vapor barrier.

PART 3 EXECUTION

3.01 INSTALLATION
A. Support, suspend, or anchor exposed pipe, fittings, valves, and appurtenances to prevent sagging, overstressing, or movement of piping; and to prevent thrusts or loads on or against connected pumps, blowers, and other equipment.

B. Field verify support location, orientation, and configuration to eliminate interferences prior to fabrication of supports.

C. Carefully determine locations of inserts. Anchor to formwork prior to placing concrete.

D. Use flush shells only where indicated on the Drawings.

E. Do not use anchors relying on deformation of lead alloy.

F. Do not use powder-actuated fasteners for securing metallic conduit or steel pipe larger than 1-inch to concrete, masonry, or wood.

G. Suspend pipe hangers from hanger rods and secure with double nuts.

H. Install continuously threaded hanger rods only where indicated on the Drawings.

I. Use adjustable ring hangers or adjustable clevis hangers for 4-inch and smaller diameter pipe.

J. Use adjustable clevis hangers for pipe larger than 4 inches in diameter.

K. Secure pipes with double nutted U-bolts or suspend pipes from hanger rods and hangers.

1. For stainless steel piping, use stainless steel U-bolts.

2. For all other piping, use galvanized U-bolts.

L. Support spacing:

1. Support 2-inch and smaller piping on horizontal and vertical runs at maximum 5 feet on center, unless otherwise specified.

2. Support larger than 2-inch piping on horizontal and vertical runs at maximum 10 feet on center, unless otherwise specified.

3. Support exposed polyvinyl chloride and other plastic pipes at maximum 5 feet on center, regardless of size.

Page 1929 of 3073 ends

Pipe Supports
15061-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15061 (BidSetFinal)

4. Support tubing, PVC pipe 1-inch and smaller, copper pipe and tubing, fiber-reinforced plastic pipe or duct, and rubber hose and tubing at intervals close enough to prevent sagging greater than 1/4-inch between supports.

5. Do not suspend or support valves, pipe and fittings from another pipe or conduit.

M. Install supports at:

1. Any change in direction.

2. Both sides of flexible pipe connections.

3. Base of risers.

4. Floor penetrations.

5. Connections to pumps, blowers, and other equipment.

6. Valves and appurtenances.

N. Securely anchor plastic pipe, valves, and headers to prevent movement during operation of valves.

O. Anchor plastic pipe between expansion loops and direction changes to prevent axial movement through anchors.

P. Provide elbows or tees supported from floors with base fittings where indicated on the Drawings.

Q. Support base fittings with metal supports or when indicated on the Drawings support on concrete piers.

R. Do not use chains, plumbers' straps, wire, or similar devices for permanently suspending, supporting, or restraining pipes.

S. Support plumbing drainage and vents in accordance with plumbing code as specified in Section 01410 - Regulatory Requirements.

T. Supports, clamps, brackets, and portions of support system bearing against copper pipe: Copper plated, copper throughout, or isolated with neoprene or polyvinyl chloride tape.

U. Where pipe is insulated, install over-sized supports and hangers.

V. Install thermal pipe shield in accordance with MSS SP-58, Type 40 on all pipe supports for insulated pipes.

W. Install riser clamps at floor penetrations and where indicated on the Drawings.

X. Coat support system components as specified in Section 09960 - High-Performance Coatings.

END OF SECTION

Page 1930 of 3073 ends
Page 1931 of 3073 ends

Preformed Channel Pipe Support System
15062-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15062 (BidSetFinal) SECTION 15062

PREFORMED CHANNEL PIPE SUPPORT SYSTEM
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Preformed channel pipe support system consisting of preformed channels, fittings, straps, and fasteners engineered to support piping.

1.02 REFERENCES
A. American Institute of Steel Construction (AISC).

B. American Iron and Steel Institute (AISI).

C. Manufacturer's Standardization Society (MSS):

1. SP-58 - Pipe Hangers and Supports - Materials, Design, and Manufacture.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Product data.

1.04 QUALITY ASSURANCE
A. Design preformed channel pipe support system for loads in accordance with applicable provisions of:

1. AISC Manual of Steel Construction.

2. AISI Cold-Formed Steel Design Manual.

B. Product standards:

1. Pipe support materials: In accordance with MSS SP-58.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Fabricate preformed channel pipe support system using, as a minimum, parts specified below and meeting the requirements specified under Design Criteria.

1. Manufacturers: One of the following or equal:
a. Unistrut, Series P1000 or P1001; P5500 or P5501.
b. Allied Support Systems, Power Strut, Figure PS-200 or PS-200 2TS; PS-150 or PS-150 2TS.
c. Cooper Ind., B-Line, Channel Type B22 or B22A; B12 or B12A.

Page 1932 of 3073 ends

Preformed Channel Pipe Support System
15062-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15062 (BidSetFinal)

2.02 DESIGN AND PERFORMANCE CRITERIA
A. Design responsibility:

1. The manufacturer of the preformed channel pipe support system is responsible for the design of the support system.

2. Prepare design calculations utilizing the design criteria included in these Specifications.

3. Prepare detailed shop drawings illustrating the layout of the support system and identifying the components of the support system.

B. Design criteria:

1. Include live, dead, and seismic loads associated with piping, valves, and appurtenances. Consider the content of the pipes in load calculations.

2. Minimum gauge thickness: 12-gauge.

3. Allowable stress of channels:
a. Steel channels: The lesser of 25,000 pounds per square inch, or

0.66 times yield stress of steel.
b. Stainless steel channels: 0.66 times the yield stress of the stainless steel alloy.

4. Maximum deflection: 1/240 of span.

5. Allowable column loads: As recommended by manufacturer in published instruction for column's unsupported height and "K" value for calculating effective column length of not less than 1.0.

6. Future loads:
a. Support systems indicated on the Drawings may include spaces intended to accommodate future pipes.
b. Assume such spaces are occupied by 6-inch diameter ductile iron pipes.

Only the number of pipes that would physically fit into the space need be considered.
c. Include the weight of the pipe contents in determining future loads.

Assume pipe contents are water.

7. Seismic design criteria: As specified in Section 01850 - Design Criteria as specified for mechanical equipment.

8. Spacing of supports: As required to comply with design requirements but not more than 5 feet.

C. Supports below the top of walls of water bearing structures: Use Type 316 stainless steel for support system components.

1. Supports in other locations: Use hot-dipped galvanized components unless other materials are specifically indicated on the Drawings.

2.03 ACCESSORIES
A. Preformed channel concrete inserts: Minimum 12 inches long:

1. Manufacturers: One of the following or equal:
a. Unistrut, Series P-3200.
b. Allied Support Systems, Figure 282.
c. Cooper Ind., B-Line Series B32I.

Page 1933 of 3073 ends

Preformed Channel Pipe Support System
15062-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15062 (BidSetFinal) B. 90-degree angle fittings:

1. Manufacturers: One of the following or equal:
a. Unistrut, P1026.
b. Allied Support Systems, Power Strut, P603.

C. Pipe straps:

1. For pipes 8 inches in diameter and smaller: Use 2-piece universal strap with slotted hex head screw and nut.
a. Manufacturers: One of the following or equal:
1) Unistrut, Series P1109 through P1126.
2) Allied Support Systems, PS1100.
3) Cooper Ind., B-Line Series B2000.

2. For pipes greater than 8 inches in diameter: Unless different material is otherwise indicated on the Drawings use 1-piece 1-inch wide by 1/8-inch thick steel strap, hot-dip galvanized after fabrication.

3. For stainless steel pipes: Use type of strap required for the pipe sizes specified above, but use Type 316 stainless steel materials.

D. Prefabricated double channel bracket:

1. Manufacturers: One of the following or equal:
a. Unistrut, P2542-P2546.
b. Cooper Ind., B-Line Series B297.

E. Touch-up paint for galvanized surfaces:

1. Manufacturers: The following or equal:
a. Galvinox, Galvo-Weld.

F. Touch-up paint for painted surfaces: Same formulation as factory paint.

G. Cushion strip:

1. For solvent welded plastic pipes in elevated temperatures, use a thermoplastic elastomer, cushion wrap designed for use from -50 degrees Fahrenheit to 275 degrees Fahrenheit. Contractor to add a cushion strip at each pipe support strap that meets this criteria.
a. Manufacturers: One of the following or equal:
1) Anvil, AS 3795.
2) Unistrut, P2600 Unicushion.

2.04 FABRICATION
A. Hot-dip galvanize support system components after fabrication to required length and shape.

B. Do not galvanize or paint stainless steel components.

Page 1934 of 3073 ends

Preformed Channel Pipe Support System
15062-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15062 (BidSetFinal) PART 3 EXECUTION

3.01 INSTALLATION
A. Install preformed channel concrete inserts for vertical support, quantity based on manufacturer's structural design calculations.

B. Fasten preformed channel pipe supports to existing walls using Z-fittings and concrete anchors as indicated on the Drawings.

C. Fasten preformed channel pipe supports to preformed channel concrete inserts embedded in ceiling using U-shaped fittings.

D. Suspend threaded rods from concrete inserts embedded in ceiling. Support preformed channel pipe supports with threaded rods.

E. Touchup cut or damaged galvanized surfaces.

F. Prevent contact between pipes and support components of dissimilar metals. Utilize rubber coated, plastic coated, or vinyl coated components, stainless steel components, or wrap pipe with PVC or polyethylene tape.

G. Install support as near as possible to concentrated loads.

H. Install support within 2 feet of horizontal and vertical changes in pipe alignment.

I. Adjust supports or install shims to obtain specified slope or elevation.

END OF SECTION

Page 1935 of 3073 ends

Non-Metallic Pipe Support System
15063-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15063 (BidSetFinal) SECTION 15063

NON-METALLIC PIPE SUPPORT SYSTEM
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Non-metallic pipe support system including the following:

1. Channel framing and components.

2. Pipe clamps.

3. Fittings.

4. Fasteners.

1.02 REFERENCES
A. ASTM International (ASTM):

1. E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Shop drawings.

C. Calculations.

1.04 QUALITY ASSURANCE
A. Supply materials from a single manufacturer with sole responsibility for the pipe support system.

B. The supplied system, including pipe clamps, shall be interchangeable with industry standard 1-5/8-inch steel and fiberglass channel framing systems.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Transportation, handling, storage, and installation shall be in accordance with the manufacturers printed instructions.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. StrutTech.

2. Unistrut.

Page 1936 of 3073 ends

Non-Metallic Pipe Support System
15063-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15063 (BidSetFinal)

2.02 DESIGN AND PERFORMANCE CRITERIA
A. Design responsibility:

1. The manufacturer of the non-metallic pipe support system shall be considered the designer of the support system.

2. Prepare design calculations utilizing the design criteria included in these Specifications.

3. Prepare detailed shop drawings illustrating the layout of the support system and identifying the components of the support system.

B. Design requirements:

1. Include live, dead, and seismic loads associated with piping, valves, and appurtenances. Consider the content of the pipes in load calculations.

2. Maximum allowable deflection: 1/240 of span.

3. Allowable column loads: As recommended by manufacturer in published instruction for column's unsupported height and "K" value for calculating effective column length of not less than 1.0.

4. Future loads:
a. Support systems indicated on the Drawings may include spaces intended to accommodate future pipes.
b. Assume such spaces are occupied by 6-inch diameter ductile iron pipes.

Only the number of pipes that would physically fit into the space need be considered.
c. Include the weight of the pipe contents in determining future loads.

Assume pipe contents are water.

5. Seismic design criteria: As specified in Section 01850 - Design Criteria as specified for mechanical equipment.

6. Spacing of supports: As required to comply with design requirements but not more than 5 feet.

2.03 MATERIALS
A. Fiberglass resin: Corrosion-resistant premium grade vinylester.

B. Injection molded components: Polyurethane thermoplastics.

C. Flame spread of fiberglass:

1. Vinylester fiberglass (Series VF): Class 1, ASTM E84.

2. Polyurethane: V-O UL 94V.

Page 1937 of 3073 ends

Non-Metallic Pipe Support System
15063-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15063 (BidSetFinal) D. Physical properties of fiberglass:

Physical Property Longitudinal Transverse
Tensile Strength 37,500 pounds per
square inch (psi)
10,000 psi
Tensile Modules 3.0 X 106 psi 1.0 X 106 psi
Flexural Strength 37,500 psi 14,000 psi
Flexural Modules 2.0 X 106 psi 1.0 X 106 psi
Compressive Strength 37,500 psi 20,000 psi
Shear Strength 6,000 psi 5,500 psi
Izod Impact 30 foot-pounds per
square inch
5 foot-pounds per
square inch
E. Surface veil: Fiberglass channel shall have polyester surface veil over 100 percent of the surface to provide protection against degradation from ultraviolet light.

F. Touch-up resin:

1. Manufacturers: The following or equal:
a. Krylon, 7006-Satin Polyurethane Clear Finish.

2.04 COMPONENTS
A. Channel framing:

1. All channel framing shall be supplied with integral notches 1 inch on center.

2. Locate notches on interior flange to prevent slippage of pipe clamps and fittings after installation.

B. Pipe clamps:

1. Adjustable type: Non-metallic and non-conductive.

2. Fixed type:
a. Pipe clamps for pipe less than 6 inches in diameter shall be non-metallic and non-conductive.
b. Pipe clamps for pipe equal to and greater than 6 inches in diameter shall be fiberglass.

C. Channel fittings:

1. Make fittings and post bases from glass-filled polyurethane or polyester.

D. Fasteners:

1. Make fasteners from one of the following materials:
a. Glass-filled polyurethane.
b. Vinylester fiberglass.

E. Cushion strip:

1. For solvent welded plastic pipes in elevated temperatures, use a thermoplastic elastomer, cushion wrap designed for use from -50 degrees Fahrenheit to

Page 1938 of 3073 ends

Non-Metallic Pipe Support System
15063-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15063 (BidSetFinal) 275 degrees Fahrenheit. Contractor to add a cushion strip at each pipe support strap that meets this criteria.
a. Manufacturers: One of the following or equal:
1) Anvil, AS 3795.
2) Unistrut, P2600 Unicushion.

PART 3 EXECUTION

3.01 INSTALLATION
A. General:

1. Install in accordance with manufacturer’s instructions, shop drawings, and as indicated on the Drawings.

2. Seal machined edges and holes with touch-up resin.

END OF SECTION

Page 1939 of 3073 ends

Pipe Identification
15076-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15076 (BidSetFinal) SECTION 15076

PIPE IDENTIFICATION
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Pipe identification including the following:

1. Pipe identification markers, flow direction arrows, tags, and bands.

2. Underground warning tape.

3. Tracer wire.

4. Witness markers.

1.02 REFERENCES
A. American Society of Mechanical Engineers (ASME):

1. A13.1 - Scheme for the Identification of Piping Systems.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Submit following:

1. Product data.

2. Samples.

3. Manufacturer's installation instructions.

4. Submit following as specified in Section 01770 - Closeout Procedures:
a. Operation and Maintenance Data.
b. Warranty.

PART 2 PRODUCTS

2.01 EXPOSED AND IN-CHASE PIPE IDENTIFICATION
A. For piping with outer diameter greater than or equal to 3/4-inch, provide lettered pipe markers and flow direction arrows:

1. General requirements:
a. Pipe markers shall include the following, minimum:
1) Printed text identifying the pipe fluid.
a) The text shall be all capital letters matching the text listed in the "Service" column of the Piping Schedule for the corresponding piping system.

Page 1940 of 3073 ends

Pipe Identification
15076-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15076 (BidSetFinal) 2) An arrow identifying the direction of fluid flow:
a) The arrow can either be integral to the text marker or provided separately. If provided separately, the arrow must be placed immediately adjacent to each text marker, with the arrow aligned with the text such that the text and arrow are both visible from the same viewpoint.
b) The arrow color shall match the text color, and the arrow background color shall match the text background color. b. Suitable for outdoor application from -40 degrees to 180 degrees Fahrenheit; in accordance with ASME A13.1 requirements. c. Lettering:

Outside Pipe Diameter Including Covering Lettering Height Less than 0.75 inches N/A

0.75 to 1.5 inches 1/2-inch

1.5 inches to 2 inches 3/4-inch

2.5 inches to 6 inches 1-1/4 inches
8 inches to 10 inches 2-1/2 inches
Over 10 inches 3-1/2 inches
d. Marker colors:

Marker
Color
System ID(1)
Fluid Service Text/Arrow Color Background Color
1 Flammable and oxidizing fluids Black Yellow
2 Potable, cooling, boiler feed,
and other waters
White Green
3 Compressed air White Blue
4 Fire quenching fluids White Red
5 Toxic and corrosive fluids Black Orange
6 Combustible fluids White Brown
7 Recycled Water White Purple
Notes: (1) See Piping Schedule.

2. Self-adhesive type markers:
a. Manufacturers: One of the following or equal:
1) Seton, (of Brady Corporation), Opti Code Pipe Markers. 2) Marking Services, Inc.
b. Materials:
1) Self-adhesive vinyl.

3. Snap-on markers:
a. Manufacturers: One of following or equal:
1) Brady Snap-On.
2) Seton (of Brady Corporation) Setmark.

Page 1941 of 3073 ends

Pipe Identification
15076-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15076 (BidSetFinal) B. For piping with outer diameter less than 3/4-inch, provide identification tags and flow direction arrows:

1. Manufacturer: One of the following or equal:
a. Seton (of Brady Corporation).

2. Tag and chain materials:
a. Copper piping: Brass.
b. Ferrous piping: Type 316 stainless steel.
c. Plastic piping: PVC.

3. Flow direction arrow colors shall adhere to the same requirements as for piping with outer diameter greater than or equal to 3/4-inch, as specified in this Section.

C. Pipe bands:

1. When bands are required by the Piping Schedule for a specific piping system, provide solid-colored 4-inch-wide bands.
a. Color as specified in the Piping Schedule.

2. Self-adhesive type.

3. Suitable for outdoor application from -40 degrees to 180 degrees Fahrenheit.

2.02 BURIED PIPELINE IDENTIFICATION
A. Underground warning tape:

1. Manufacturer: One of the following or equal:
a. Seton (of Brady Corporation).
b. T. Christy Enterprises, Inc.

2. Material:
a. Polyethylene tape for prolonged underground use.
b. Minimum tape thickness: 4 mils.
c. Overall tape width: 4 inches.
d. Message: “CAUTION” with the name of the service followed by “LINE BURIED BELOW.” in black lettering on colored background in accordance with approved APWA colors.

Service Color
Potable water Blue
Reclaimed water, irrigation, and slurry lines Purple
Sewers and drain lines Green
Gas, oil, steam, petroleum, chemicals, or other
service
Yellow
B. Tracer wire:

1. Manufacturers: One of the following or equal:
a. Kris-Tech Wire.
b. Aegion Corrpro.

2. Materials: One of the following or equal:
a. Solid copper conductor
b. Thickness minimum: 10 gauge.

Page 1942 of 3073 ends

Pipe Identification
15076-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15076 (BidSetFinal) c. Insulation:
1) Match insulation color to the color of the pipe being installed. 2) UF type, direct bury.
3) 30 mil HMWPE.

3. Splicing kit:
a. Manufacturers: One of the following or equal:
1) 3M, Model 82 A1N.

4. Station box:
a. Lid and collar materials: Cast iron.
b. Lid type: Locking.
c. Able to withstand heavy traffic loading.
d. Manufacturers: One of the following or equal:
1) CP Test & Valve Products, Inc., Glenn Test Station.
2) Farwest Corrosion Control.

C. Witness markers:

1. Manufacturers: One of the following or equal:
a. Carsonite Composites, Utility Marker.

2. Materials:
a. Glass fiber and resin reinforced thermosetting composite material. b. UV resistant.

3. Constructed as a single piece.

4. Pointed at the bottom end.

5. Information to be included on the marker:
a. “Caution” (type of service) “Pipeline”.
b. Phone number for Underground Service Alert.
c. Phone number for Owner in case of emergency.
d. Station number.
e. Offset:
1) Only provide offset if marker is not directly over the pipe. f. Name of appurtenance or fitting (e.g., 45, BO, ARV, etc.) PART 3 EXECUTION

3.01 EXAMINATION
A. Verify satisfactory conditions of substrate for applying identification.

B. Verify that conditions are satisfactory for installation and application of products as specified in Section 01600 - Product Requirements.

3.02 PREPARATION
A. Prepare and coat piping with the coating systems defined in the Piping Schedule.

B. Prepare surface in accordance with identification product manufacturer's instructions.

Page 1943 of 3073 ends

Pipe Identification
15076-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15076 (BidSetFinal)

3.03 EXPOSED AND IN-CHASE PIPING IDENTIFICATION
A. Identify exposed and in-chase piping with flow direction arrows and lettering (for piping with outer diameter greater than or equal to 3/4-inch) or tags (for piping with outer diameter less than 3/4-inch).

B. Provide lettering (or tags for pipes with outer diameter less than 3/4-inch) and flow direction arrows near equipment served, adjacent to valves, both sides of walls and floors where pipe passes through, at each branch or tee, and at intervals of not more than 50 feet in straight runs of pipe.

1. Label all chemical tank fill pipelines at locations that are visible from chemical fill stations.

2. Place markers on piping so they are visible from operator's position in walkway or working platform near piping. Locate markers along horizontal centerline of pipe, unless better visibility is achieved elsewhere.

3. Do not apply markers, arrows, or tags to piping that is regularly submerged.

C. Where scheduled in the Piping Schedule, space solid-color bands along piping at 10-foot intervals.

1. Do not apply bands to piping that is regularly submerged.

3.04 BURIED PIPING IDENTIFICATION
A. Underground warning tape:

1. Non-detectable warning tape:
a. Place continuous run of warning tape in pipe trench, 12 inches above the pipe.

2. Detectable warning tape:
a. Place continuous run of warning tape in pipe trench, 12 inches above the pipe or a greater height if necessary to limit the tape bury depth to 36 inches. Do not bury detectable warning tape deeper than 36 inches.

B. Tracer wire:

1. Install on all non-metallic pipe.

2. Install an electrically continuous run of tracer wire along the entire length of the pipe with wire terminations in valve boxes, vaults, or structures.

3. Install tracer wire on top of the pipe and secure to pipe with tape a minimum of every 10 feet.

4. Where approved by the Engineer, splice sections of wire together using approved direct bury wire nuts.
a. Twisting the wires together is not acceptable.

C. Witness markers:

1. Install over pipe in unpaved open-space areas at intervals not greater than 200 feet.

2. Place markers at appurtenances located in unpaved areas.

3. Embed markers at least 18 inches into the soil.

END OF SECTION

Page 1944 of 3073 ends
Page 1945 of 3073 ends

Piping Insulation
15082-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal) SECTION 15082

PIPING INSULATION
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Insulation for piping and related systems that are not plumbing systems.

1.02 REFERENCES
A. American Association of State Highway and Transportation Officials (AASHTO):

1. Standard Specifications for Highway Bridges.

B. ASTM International (ASTM):

1. A53 - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded, and Seamless.

2. C177 - Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.

3. C518 - Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus.

4. C533 - Standard Specification for Calcium Silicate Block and Pipe Thermal Insulation.

5. C547 - Standard Specification for Mineral Fiber Pipe Insulation.

6. C552 - Standard Specification for Cellular Glass Thermal Insulation.

7. C795 - Standard Specification for Thermal Insulation for Use in Contact with Austenitic Stainless Steel.

8. C929 - Standard Practice for Handling, Transporting, Shipping, Storage, Receiving, and Application of Thermal Insulation Materials for Use in Contact with Austenitic Stainless Steel.

9. C1136 - Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation.

10. D1784 - Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds.

11. D2310 - Standard Classification of Machine-Made "Fiberglass" (Glass-Fiber-Reinforced-Thermosetting-Resin) Pipe.

12. E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.

13. E96 - Standard Test Methods for Water Vapor Transmission of Materials.

C. California Energy Commission:

1. Title 24 - Building Energy Efficiency Standards.

Page 1946 of 3073 ends

Piping Insulation
15082-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal)

1.03 DEFINITIONS
A. Buried: Piping that is installed below buildings, foundations, or finish grade, either in soil or encased in concrete in soil.

B. Concealed: Piping above suspended ceilings and within walls, partitions, shafts, or service spaces and spaces not normally exposed to view but not buried.

C. Exterior: Piping that is installed outside a building or within a pipe trench or tunnel.

D. Flame Spread and Smoke Density: Burning characteristics determined in accordance with ASTM E84.

E. Interior: Piping that is installed inside a building.

F. K Factor: Thermal conductivity determined in accordance with ASTM C177 or C518.

G. Mineral Fiber: Fibers manufactured of glass, rock, or slag processed from a molten state, with or without a binder.

H. Water Vapor Permeance: Water vapor transmission determined in accordance with ASTM E96 and expressed in units of perm-inch.

1.04 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Product data: As specified in Section15050 - Common Work Results for Mechanical Equipment.

1. Insulation properties: Include K factor, thickness, density, operating temperature limits, tensile strength, compressive strength, moisture absorption, flame spread, and smoke developed in accordance with ASTM E84 and corrosivity to stainless steel piping in accordance with ASTM C795.

2. Jacket properties: Include covering material, cover thickness, tensile strength, tear strength, permeability in accordance with ASTM E96, flame spread, and smoke developed in accordance with ASTM E84, closure type or devices, and accessories.

3. Insulating blankets: Include materials, performance characteristics, method of attaching to equipment, listing of locations where insulating blankets will be installed.

4. Manufacturer's application instructions: Include assembly and application drawings and detailed instructions.

1.05 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

Page 1947 of 3073 ends

Piping Insulation
15082-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal) PART 2 PRODUCTS

2.01 GENERAL
A. As specified in Section 01600 - Product Requirements with additional requirements in Section 15050 Common Work Results for Mechanical Equipment and Section 15500 - Common Work Results for HVAC.

B. In accordance with California Energy Commission Title 24.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. As specified in Section 15050 Common Work Results for Mechanical Equipment and Section 15500 - Common Work Results for HVAC.

B. Insulation thicknesses: Provide insulation thickness in inches in accordance with the following table. Insulation thickness shown is nominal. Manufacturing tolerance of 15 percent variation is permissible.

Table 1. Required Insulation Thicknesses
Required Insulation Thicknesses (inches)
Service Temperature Range
as Designated in Insulation
Schedule at End of
this Section
Nominal Pipe Diameters
1 inch
and Less

1.25 to
2 inches

2.5 to
4 inches
5 to
10 inches
Over
10 inches
Above 200 degrees
Fahrenheit

2.0 2.5 3.0 3.5 3.5
100 to 200 degrees Fahrenheit 1.5 1.5 1.5 2.0 2.5
40 to 100 degrees Fahrenheit 0.5 1.0 1.0 1.5 2.0
Below 40 degrees Fahrenheit 1.0 1.0 1.5 2.0 2.0
Airwash Air Pipes 0.5 0.5 1.0 1.0 1.0

2.03 PIPE INSULATION
A. Insulation types: Provide in accordance with the insulation types listed and scheduled.

B. Insulation, Type 2:

1. Insulation material: Preformed mineral fiberglass insulation made from glass fibers bonded with a thermosetting resin.
a. In accordance with ASTM C547, Class 1.
b. Provide with factory installed vapor barrier.
1) Material: White Kraft paper bound to aluminum foil in accordance with ASTM C1136, Type I.
2) Longitudinal lap seals: Pressure-sensitive, self-sealing longitudinal lap strip with factory applied adhesive.
3) Circumferential butt seals: 4-inch wide tape or similar properties or 4-inch wide overlap with adhesive seal.
4) Vapor barrier permeability: 0.02 perms or lower.
5) Vapor barrier flame spread rating: 25 or less.

Page 1948 of 3073 ends

Piping Insulation
15082-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal)

2. Minimum temperature range: Minus 0 degrees Fahrenheit to plus 850 degrees Fahrenheit.

3. K factor at 75 degrees Fahrenheit: Not more than 0.23 BTU-inch/hour-square feet degrees Fahrenheit.

4. Maximum moisture absorption, volume percent: 5.

5. Manufacturers: One of the following or equal:
a. Owens-Corning , Fiberglas™ FLEXWRAP® ASJ.
b. Johns Manville, Micro-Lok® HP.
c. Knauf Insulation, Earthwool® Redi-Klad® 1000° Pipe Insulation.

2.04 INSULATION JACKETS
A. Jacket, Type 2:

1. Material: Ultraviolet-resistant polyvinyl chloride jacketing, 20 mil minimum thickness.

2. Fire rating: 25 maximum flame spread, smoke developed 50 or less.

3. Color: White.

4. Overlap: 1-inch minimum at joints and fittings.

5. Joint seal: PVC solvent welded or adhesive as recommended by the manufacturer.

6. Fittings: Factory made with full thickness insulation.

7. Manufacturers: One of the following or equal:
a. Johns Manville, Zeston® 2000 PVC.
b. Proto Corp., LoSMOKE PVC.
c. Speedline® Corp., Smoke-Safe™ PVC.

2.05 VAPOR BARRIERS
A. Vapor barrier, Type 1:

1. Material: White Kraft paper bound to aluminum foil in accordance with ASTM C1136, Type 1.

2. Permeability: 0.02 perms or lower.

3. Maximum flame spread rating: 25.

4. Edge seal: Pressure-sensitive tape lap seal.

5. Circumferential joints: 4-inch wide tape or 4-inch overlap with adhesive seal.

B. Vapor barrier, Type 2:

1. Material: Mastic.

2. Manufacturers: One of the following or equal:
a. Benjamin Foster, No. 30-76.
b. Insul-Coustic, No. I.C.-580.
c. Foster Products, 36-10/46-10 Weatherite.
d. Childers Products CP10/11 VI-CRYL.

2.06 RELATED MATERIALS
A. Cover adhesive: Premium adhesive as recommended by the insulation cover supplier for heavy-duty service in corrosive, wet environments. Standard-duty adhesives are not permitted.

Page 1949 of 3073 ends

Piping Insulation
15082-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal)

2.07 REMOVABLE INSULATING BLANKETS
A. In piping systems specified to be insulated, use removable insulating blankets for valves, meters, strainers, filters, catalytic converters, engine exhaust silencers, pumps, and other in-line piping appurtenances and equipment requiring periodic servicing, regardless of pipe size.

B. Size limits: Use removable insulating blankets for equipment and piping appurtenances 3 inches in nominal size and larger. For equipment and piping appurtenances less than 3 inches that do not require periodic servicing, insulate with molded sections of insulation or by field cutting insulation to conform to the shape of the component and to fit tightly around the component.

C. Manufacturers: One of the following, or equal:

1. Thermal Energy Products, Inc., Energy Wrap.

2. Accessible Products, Thermazip 2000 Jacket.

3. Owens Corning, Temp-Mat.

D. Low temperature insulating blankets rated up to 800 degrees Fahrenheit:

1. Use: For service temperatures up to 800 degrees Fahrenheit.

2. Insulation: Fiberglass fiber, K factor 0.27 at 75 degrees Fahrenheit.

3. Cover: 17-ounce fabric with both sides covered with silicone-impregnated glass cloth suitable for temperatures up to 800 degrees Fahrenheit.

4. Cover fasteners: Use one of the following systems:
a. Grommets in the blanket and stainless steel wire.
b. 1-inch wide straps with stainless steel rectangular ring buckles and Velcro on strap tail.

2.08 SHIPPING, SPARE PARTS, MAINTENANCE PRODUCTS, AND SPECIAL TOOLS A. As specified in Section 01600 - Product Requirements.

PART 3 EXECUTION

3.01 GENERAL
A. As specified in Section 01600 - Product Requirements.

B. Handle and store insulation for use on stainless steel in accordance with ASTM C929.

3.02 PREPARATION
A. Pressure test piping and complete application of coating system before applying insulation.

Page 1950 of 3073 ends

Piping Insulation
15082-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal) B. When piping is to be heat traced, install and functionally test heat tracing before installation of insulation.

C. Before beginning installation of piping insulation, verify that the Engineer has accepted piping tests, pipe coating applications, and heat tracing tests.

3.03 INSULATION SCHEDULE
A. Table 2. Insulation Schedule, does not include insulation required for plumbing systems. Plumbing systems insulation: As specified in Section 15400 - Plumbing Systems.

Table 2. Insulation Schedule
Service
Designation(1) Location(2)
Insulation
Type(3)
Jacket
Type(3)
Service
Temp. °F(4) Vapor Barrier
Airwash Air (AA)(5) Interior/Exterior 2 2 Note 4 Required Notes:
(1) Refer to Piping Schedule in Section 15052 - Common Work Results for General Piping for service designations.
(2) Insulation jackets are not required for interior installations that are concealed. See definitions for description of concealed locations.
(3) Contractor may select from options listed.
(4) Unless noted otherwise, use service temperature range provided in this table to establish insulation thickness as required by TABLE 1. Required Insulation Thicknesses. (5) Install insulation on all new AA piping located from the discharge of blowers to the AWTs. Insulation is not required for existing AA piping or new AA that is installed higher than 10 feet above the slab.

3.04 INSTALLATION
A. Install insulation and jacket materials in accordance with manufacturer's written instructions.

B. Apply insulation in smooth, clean manner with tight and finished smooth joints. Fit insulation tightly against surfaces. Insulate each continuous run of pipe with full-length sections of insulation with a single piece cut to length to complete the run of pipe. Do not use cut pieces or scraps to complete the installation.

C. Butt longitudinal and circumferential insulation joints firmly together.

D. Maintain the integrity of vapor barrier jacketing. Do not use staples to hold vapor barrier overlaps in place.

E. Apply sealant or cement when previous applications of adhesives and cement have thoroughly dried.

F. Apply insulation to permit expansion or contraction of pipelines without damage to insulation or jacketing.

G. Fittings:

1. Insulate fittings by covering with mitered sections of insulation or utilize factory-made prefabricated fitting shapes.

Page 1951 of 3073 ends

Piping Insulation
15082-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15082 (BidSetFinal)

2. Terminate preformed pipe jackets or covering at sufficient distance from flanges to permit removal of bolts.

3. Overlap flange and flanged fitting insulation on adjacent pipe covering by at least 2 inches.

H. Valves:

1. Insulate valves 3 inches in nominal size and larger with removable insulating blankets.

2. Size blanket to extend up to packing gland only so that replacement of packing does not require removal of insulating blanket.

I. Provide continuous insulation through and over pipe supports and provide protection saddles at supports.

J. Extend insulation against insulation end protection shields or covers so that insulation voids do not exist and provide watertight end seals and covers where insulation terminates.

K. Provide continuous pipe insulation and covering through sleeves or openings in walls and floors. When buried pipe enters a building through a below grade wall or slab penetration, begin insulation system on interior side of penetration.

L. Apply pre-molded pipe insulation with extended legs when used on pipe traced with either tubing or electric cable type.

M. Thermally isolate all insulation closure locations (end caps, transitions, etc.) Type 1 or 2 jacket installation on piping with potential reach temperatures greater than 150 degrees Fahrenheit.

N. Apply piping identification on jackets as specified in Section 15076 - Pipe Identification.

END OF SECTION

Page 1952 of 3073 ends
Page 1953 of 3073 ends

Common Work Results for Valves
15110-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal) SECTION 15110

COMMON WORK RESULTS FOR VALVES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Basic requirements for valves.

1.02 REFERENCES
A. American Water Works Association (AWWA):

1. C111/A21.11 - Standard for Rubber-Gasket Joints for Ductile-Iron Pressure Pipe Fittings.

B. ASTM International (ASTM):

1. A126 - Standard Specification for Gray Iron Casting for Valves, Flanges, and Pipe Fittings.

2. A480 - Standard Specification for General Requirements for Flat-Rolled Stainless and Heat-Resisting Steel Plate, Sheet, and Strip.

3. A536 - Standard Specification for Ductile Iron Castings.

C. NSF International (NSF):

1. 61 - Drinking Water System Components - Health Effects.

D. Society for Protective Coatings (SSPC):

1. SP7 - Brush-Off Blast Cleaning.

2. SP10 - Near-White Blast Cleaning.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Submit the following information for each valve:
a. Valve type, size, pressure rating, Cv factor.
b. Coatings.
c. Power valve actuators:
1) Information on valve actuator including size, manufacturer, model number, limit switches, mounting; and motor enclosure, seating and unseating torque coefficient, dynamic torque, and bearing friction for calculation of maximum operating torque.
2) Complete wiring diagrams and control system schematics. d. Manual valve actuators:
1) Information on valve actuator including size, manufacturer, model number.
e. Certified drawings with description of component parts, dimensions, weights, and materials of construction.

Page 1954 of 3073 ends

Common Work Results for Valves
15110-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal) f. Certifications of reference standard compliance:
1) Submit certification that the valves and coatings are suitable in potable water applications in accordance with NSF 61.
g. Clearly mark submittal information to show specific items, materials, and accessories or options being furnished.
h. Factory test data.

C. Provide vendor operation and maintenance manual as specified in Section 01782 - Operation and Maintenance Manuals.

1. Furnish bound sets of installation, operation, and maintenance instructions for each type of manual valve 4 inches in nominal size and larger, and all non-manual valves. Include information on valve operators.

D. Provide Manufacturer’s Certificate of Source Testing as specified in Section 01756 - Commissioning.

E. Provide Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.

1.04 QUALITY ASSURANCE
A. Manufacturer qualifications:

1. Valves manufactured by manufacturers whose valves have had successful operational experience in comparable service.

1.05 DELIVERY STORAGE AND HANDLING
A. Protect valves and protective coatings from damage during handling and installation; repair coating where damaged.

PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. Pressure rating:

1. Suitable for service under minimum working pressures of 150 pounds per square inch gauge.

2. When a piping system is specified in the Piping Schedule to be tested at a pressure greater than 150 pounds per square inch gauge, provide valves for that piping system with design working pressure which is sufficient to withstand the test pressure.

B. Valve to piping connections:

1. Metallic valves:
a. Valves 3 inches nominal size and larger: Flanged ends. b. Valves less than 3 inches nominal size: Screwed ends.

Page 1955 of 3073 ends

Common Work Results for Valves
15110-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal)

2. Plastic valves in plastic piping systems:
a. Up to 4 inches: Provide solvent or heat welded unions, except for plastic butterfly valves.
1) Plastic butterfly valves shall be flanged per Section 15112 - Butterfly Valves.
b. 6 inches and above: Provide solvent or heat-welded flanges.

2.02 MATERIALS
A. Stainless steel: In accordance with ASTM A480, Type 316, or Type 304, UNS Alloy S31600 or S30400.

B. Valve and operator bolts and nuts (not including flange bolts and nuts, which are specified in Section 15052 - Common Work Results for General Piping):

1. Fabricated of stainless steel for the following installation conditions:
a. Submerged in sewage or water.
b. In an enclosed space above sewage or water.
c. In structures containing sewage or water, below top of walls. d. At openings in concrete or metal decks.

2. Where dissimilar metals are being bolted, use stainless steel bolts with isolation bushings and washers.

3. Underground bolts: Low-alloy steel in accordance with AWWA C111/A21.11.

C. Bronze and brass alloys: Use bronze and brass alloys with not more than 6 percent zinc and not more than 2 percent aluminum in the manufacture of valve parts; UNS Alloy C83600 or C92200 unless specified otherwise.

D. Cast iron valve bodies: In accordance with ASTM A126, Class 30 minimum.

E. Ductile iron valve bodies: In accordance with ASTM A536, Grade 65-45-12 minimum unless specified otherwise.

2.03 INTERIOR PROTECTIVE LINING
A. When specified in the particular valve specification, provide valves with type of protective lining specified in the particular valve Specification.

B. Apply protective lining to interior, non-working surfaces, except stainless steel surfaces.

C. Lining types:

1. Fusion bonded epoxy:
a. Manufacturers: The following or equal:
1) 3-M Company, ScotchKote 134; certified to NSF 61 for drinking water use.
b. Clean surfaces in accordance with SSPC SP 7 or SP 10, as recommended by epoxy manufacturer.
c. Apply in accordance with manufacturer's published instructions. d. Lining thickness: 0.010 to 0.012-inch, except that:
1) Lining thickness in grooves for gaskets: 0.005-inch. 2) Do not coat seat grooves in valves with bonded seat.

Page 1956 of 3073 ends

Common Work Results for Valves
15110-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal) e. Quality control:
1) Lining thickness: Measured with a non-destructive magnetic type thickness gauge.
2) Verify lining integrity with a wet sponge-testing unit operating at approximately 60 volts, or as recommended by the lining manufacturer.
3) Consider tests successful when lining thickness meets specified requirements and when no pinholes are found.
4) Correct defective lining disclosed by unsuccessful tests, and repeat test.
5) Repair pinholes with liquid epoxy recommended by manufacturer of the epoxy used for lining.

2. High solids epoxy:
a. Product equivalent to high solids epoxy as specified in Section 09960 - High-Performance Coatings.
1) Certified in accordance with NSF 61 for drinking water use. 2) Interior: Coat valve interior with manufacturer's equivalent high performance high solids epoxy coating system with a certifiable performance history for the service conditions and as approved by the Engineer. Manufacturer shall provide for approval, coating information sufficient to allow Engineer to assess equivalence to the specified high solids epoxy as specified in Section 09960 - High-Performance Coatings.
b. Clean surfaces to meet SP-7 or SP-10, or as recommended by coating manufacturer.
c. Quality control: After coating is cured, check coated surface for porosity with a holiday detector set at 1,800 volts, or as recommended by coating manufacturer.
1) Repair holidays and other irregularities and retest coating. 2) Repeat procedure until holidays and other irregularities are corrected.

2.04 UNDERGROUND VALVES
A. Provide underground valves with flanged, mechanical, or other type of joint required for the type of pipe to which the valve is to be connected.

B. Coating and wrapping:

1. After installation, encase valves in polyethylene wrap as specified for ductile iron piping in Section 15211 - Ductile Iron Pipe: AWWA C151. a. Ascertain that polyethylene wrapping does not affect operation of valve.

2.05 STEAM VALVES
A. Valves in steam or steam condensate piping: Ductile iron body in accordance with ASTM A536, Grade 65-45-12 minimum or cast steel or forged steel.

Page 1957 of 3073 ends

Common Work Results for Valves
15110-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal)

2.06 VALVE BOXES
A. Provide cast-iron valve boxes at each buried valve to access valve and valve operators.

B. Do not support boxes on valve, valve operator, or pipe.

C. Boxes:

1. 2-piece, fabricated of cast iron; provide cover, with asphalt varnish or enamel protective coating.

2. Adjustable to grade, install centered around the upper portions of the valve and valve operator.

D. Manufacturers: One of the following or equal:

1. Tyler Pipe Industries, Inc.

2. Neenah Foundry Co.

2.07 VALVE OPERATORS
A. Valve operator "Open" direction: Open counterclockwise.

B. Provide valves located below operating level or deck with extensions for key operation or floor stands and handwheels, as indicated on the Drawings.

C. Provide manually operated valves located not more than 6 feet above the operating level with tee handles, wrenches, or handwheels.

1. Make the valve operator more conveniently accessible by rolling valves, located more than 5 feet but less than 6 feet above the operating level, toward the operating side.

2. Secure tee handles and wrenches to the valve head or stem, except where a handle or wrench so secured constitutes a hazard to personnel; in which case, stow handle or wrench immediately adjacent to the valve on or in a suitable hanger, bracket, or receptacle.

D. Fit valves located more than 6 feet above operating level with chain operated handles or valve wheels.

1. Chains: Sufficient length to reach approximately 4 feet above the operating level.

2. Where chains constitute a nuisance or hazard to operating personnel, provide holdbacks or other means for keeping the chains out of the way.

E. Provide an operator shaft extension from valve or valve operator to finished grade or deck level when buried valves, and other valves located below the operating deck or level, are specified or indicated on the Drawings to be key operated; provide 2 inches square AWWA operating nut, and box and cover as specified, or a cover where a box is not required.

Page 1958 of 3073 ends

Common Work Results for Valves
15110-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal) PART 3 EXECUTION

3.01 EXAMINATION
A. Preparation prior to installation:

1. Install valves after the required submittal on installation has been accepted.

2. Determine after flanged valves and flanged check valves are selected, the face-to-face dimensions of flanged valves and flanged check valves.

B. Fabricate piping to lengths taking into account the dimensions of flanged valves and flanged check valves.

3.02 INSTALLATION
A. Provide incidental work and materials necessary for installation of valves including flange gaskets, flange bolts and nuts, valve boxes and covers, concrete bases, blocking, and protective coating.

B. Where needed, furnish and install additional valves for proper operation and maintenance of equipment and plant facilities under the following circumstances:

1. Where such additional valves are required for operation and maintenance of the particular equipment furnished by Contractor.

2. Where such additional valves are required as a result of a substitution or change initiated by Contractor.

C. Valve and actuator orientation:

1. Contractor shall coordinate with valve supplier final orientation of valve and actuator assembly based on Contractor's selection of equipment manufacturers and the valve and piping arrangement as indicated on the Drawings.
a. Contractor shall rotate valve and/or actuator mounting orientation as specified in this Section unless otherwise indicated on the Drawings.

2. Install valves with their stems in vertical position above the pipe, except as follows:
a. Butterfly valves, gate valves aboveground, globe valves, ball valves, and angle valves may be installed with their stems in the horizontal position. b. Install buried plug valves with geared operators with their stems in a horizontal position.

3. Install valves so that handles clear obstructions when the valves are operated from fully open to fully closed.

D. Place top of valve boxes flush with finished grade or as otherwise indicated on the Drawings.

E. Valves with threaded connections:

1. Install valves by applying wrench on end of valve nearest the joint to prevent distortion of the valve body.

2. Apply pipe joint compound or Teflon™ tape on external (male) threads to prevent forcing compound into valve seat area.

Page 1959 of 3073 ends

Common Work Results for Valves
15110-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15110 (BidSetFinal) F. Valves with flanged connections:

1. Align flanges and gasket carefully before tightening flange bolts.

2. When flanges are aligned, install bolts and hand tighten.

3. Tighten nuts opposite each other with equal tension before moving to next pair of nuts.

G. Valves with soldered connections:

1. Do not overheat connection to prevent damage to resilient seats and metal seat rings.

2. Position valves in full open position before starting soldering procedure.

3. Apply heat to piping rather than to valve body.

3.03 FIELD APPLIED COATING OF VALVE EXTERIOR
A. Match color and be compatible with manufacturer’s coating system and as specified in Section 09960 - High-Performance Coatings.

1. When shop applied finish coating matches field applied coating on adjacent piping, touch up shop coating in damaged areas in accordance with instructions recommended by the paint manufacturer.

2. When shop applied coating does not match field coating on adjacent piping, or when damage has occurred to the shop applied coating that requires more than touchup, blast clean valve surfaces or utilize other surface preparation recommended by the manufacturer of the coating material and apply the coating system used for coating adjacent piping.

3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning and this Section.

B. Manufacturer services from each manufacturer for all valves supplied:

1. Provide Manufacturer’s Certificate of Source Testing.

2. Provide Manufacturer’s Certificate of Installation and Functionality Compliance.

C. As specified elsewhere for specific valve types, sizes, or actuators.

1. Source testing.

2. Manufacturers on site services for Owner Training, Installation Testing, Functional Testing, and during the Process Operational Period.

END OF SECTION

Page 1960 of 3073 ends
Page 1961 of 3073 ends

Ball Valves
15111-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15111 (BidSetFinal) SECTION 15111

BALL VALVES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: Ball valves.

B. As specified in Section 15110 - Common Work Results for Valves.

1.02 REFERENCES
A. American Society of Mechanical Engineers (ASME):

1. B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and 250.

2. B16.5 - Pipe Flanges and Flanged Fittings: NPS 1/2 through 24.

B. American Water Works Association (AWWA):

1. C507 - Standard for Ball Valves 6 Inch Through 48 Inch.

C. ASTM International (ASTM):

1. A48 - Standard Specification for Gray Iron Castings.

2. A216 - Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for High-Temperature Service.

3. A351 - Standard Specification for Castings, Austenitic, for Pressure-Containing Parts.

1.03 SUBMITTALS
A. Submit as specified in Section 01330 - Submittal Procedures.

B. Product data: As specified in Section 15110 - Common Work Results for Valves:

1. Metal body ball valves: 6 inches and larger only: Submit affidavit of compliance in accordance with AWWA C507.

2. Operation and maintenance manual.

C. Commissioning submittals:

1. Provide Manufacturer’s Certificate of Installation and Functionality Compliance as specified in Section 01756 - Commissioning.

1.04 WARRANTY
A. Provide warranty as specified in Section 01783 - Warranties and Bonds.

Page 1962 of 3073 ends

Ball Valves
15111-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15111 (BidSetFinal) PART 2 PRODUCTS

2.01 DESIGN AND PERFORMANCE CRITERIA
A. General: Unless otherwise indicated on the Drawings use:

1. Metal body ball valves on metallic pipelines.

2. Plastic body ball valves on plastic pipelines.

B. Do not use metal body ball valves in sodium hypochlorite or sodium bisulfite systems.

2.02 METAL BODY BALL VALVES – FULL PORT (BAV00)
A. Metal Body Ball Valves, 6-Inch Size and Larger:

1. Manufacturers: One of the following or equal:
a. Crane ChemPharma Energy, Resilient seated valve.
b. DeZURIK/APCO, Metal seated valve.
c. Henry Pratt Company, Resilient seated valve.

2. General:
a. Type: Non-lubricated, resilient seated or metal seated and capable of sealing in either flow direction.
b. In accordance with AWWA C507.
c. Stem packing: Manually adjustable while valve is under pressure. d. ASME B16.1, Class 125 flanged ends.

3. Materials:
a. Body: ASTM A48 cast iron with 400 series Monel seats (metal seated valves only) and integrally cast bronze bushed trunnions. b. Ball: Type 304 or 316 stainless steel.
c. Seats:
1) Resilient seated valves:
a) PTFE.
2) Metal seated valves:
a) 300 series stainless steel.
d. Stem seals: PTFE or Viton™.

4. Valve actuator:
a. Manually operated valves: Self-locking worm gear type actuator with position indicator. Permanently lubricate gearing. Provide adjustable screws to stop travel at both open and closed positions. b. Electric motor operated valves: Provide electric motor operator as specified in Section 13447 - Electric Actuators.

B. Metal body ball valves, less than 6-inch size

1. Manufacturers: One of the following, or equal:
a. Conbraco Industries, Inc., Apollo Valves.
b. Flow-Tek, Inc.
c. Metso Automation/Jamesbury.
d. NIBCO, Inc.

2. General:
a. Type: Non-lubricated, full port and capable of sealing in either direction. b. End connections:
1) Threaded or solder ends for sizes 3-inch and smaller.

Page 1963 of 3073 ends

Ball Valves
15111-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15111 (BidSetFinal) 2) Class 150 flanged for sizes larger than 3 inches.
a) Flanges: In accordance with ASME B16.1 standards.
c. Stem packing: Manually adjustable while valve is under pressure. d. Shafts:
1) Rigidly connected to the ball by a positive means.
a) Design connection to transmit torque equivalent to at least 75 percent of the torsional strength of the shaft.
e. Handles: Stainless steel latch lock handle with vinyl grip and stainless steel nut designed to open and close the valve under operating conditions.
f. Temperature limits: Suitable for operation between minus 20 and 350 degrees Fahrenheit.

3. Materials:
a. Valves in copper lines: Bronze body.
b. Valves in steel and ductile iron piping: Ductile iron or cast steel body. c. Valves in stainless steel piping: Stainless steel body, material type to match piping material as specified in Section 15052 - Common Work Results for General Piping.
d. Ball: Type 304 or 316 stainless steel, Type 316 in digester gas applications.
e. Seats: PTFE.
f. Stem seals: PTFE or Viton™.
g. Bearings: Self-lubricated, corrosion resistant material that will not contaminate potable water.
h. Valves for combustible fluid applications (digester gas, natural gas, fuel oil, etc.) must be of fire safe design.

4. Venting requirements:
a. Metal ball valves for hydrogen peroxide service:
1) Provide valve with factory drilled 0.125-inch hole in the upstream side of the ball.
2) Provide an engraved Type 316 stainless steel tag permanently attached to the valve stem stating, "One side of ball drilled for hydrogen peroxide service".

2.03 PLASTIC BODY BALL VALVES – FULL PORT (BAV40)
A. Manufacturers: One of the following or equal:

1. Asahi America.

2. Chemtrol Division, NIBCO, Inc.

3. Georg Fischer Piping Systems.

4. Hayward Flow Control.
a. For sodium hypochlorite service, provide model TB-Z. Model TBH-Z shall not be used.

5. IPEX USA, LLC

6. Plast-O-Matic Valves, Inc.

Page 1964 of 3073 ends

Ball Valves
15111-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15111 (BidSetFinal) B. General:

1. Type: Non-lubricated and capable of sealing in either flow direction.

2. End connections:
a. 4 inches and smaller size: Socket end true unions for solvent welded connection to adjacent piping.
b. 6-inch size: Socket end true unions with attached flanges for flanged connection to adjacent piping.

3. All valves shall have integral ISO 5211 mounting pad for actuator installation.

4. All valves shall have integral plate for lock-out/tag-out.

5. Stem: Double O-ring seal with shear point above seal.

6. Pressure rating: Suitable for the test pressure and maximum temperature of the corresponding piping system listed in the Piping Schedule.

C. Materials:

1. Body and ball:
a. PVC piping systems: PVC.
b. CPVC piping systems: CPVC.

2. Seats: PTFE (Teflon™).

3. O-rings: Match gasket material of corresponding piping system listed in the Piping Schedule.

D. Limit switches, when indicated on the Drawings:

1. Mechanical cam type with watertight enclosure and suited for remote indication of valve open-close status.

2. Mount on valve actuator.

3. Contacts: 120-volt alternating current, 20 amperes at 75 to 100 percent power factor and 24-volt direct current, 5 amperes minimum.

E. Valve actuator:

1. Valves shall be quarter turn operated with valve seat adjustability.

2. Manually operated valves: Lever.

Electric motor operated valves, when indicated on the Drawings: Provide electric motor operator as specified in Section 13447 - Electric Actuators.

F. Venting requirements:

1. PVC and CPVC ball valves for hypochlorite service:
a. Provide valve with factory drilled 0.125-inch hole in the upstream side of the ball.
b. Provide an engraved plastic tag permanently attached to the valve stem stating, "One side of ball drilled for hypochlorite service". c. Provide an arrow inscribed on the valve body to indicate direction of flow.

2.04 PLASTIC BODY BALL VALVES – V-PORT (BAV50):

A. Provide proportional flow control ("V-port") ball valve when indicated on the Drawings.

B. Manufacturer and model shall be the following or equal:

1. Hayward Flow Control CVH Series.

Page 1965 of 3073 ends

Ball Valves
15111-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/15111 (BidSetFinal) PART 3 EXECUTION

3.01 INSTALLATION
A. General: Install each type of valve in accordance with manufacturers' printed instructions.

3.02 COMMISSIONING
A. As specified in Section 01756 - Commissioning and this Section.

B. Manufacturer services:

1. Provide certificates:
a. Manufacturer's Certificate of Installation and Functionality Compliance.

C. Functional testing:

1. Valves:
a. Test witnessing: Witnessed.
b. Conduct pressure and leak test, as specified in Section 15956 - Piping Systems Testing.

END OF SECTION