Reduced Harmonic Variable Frequency Drives
16265-12 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16265 (BidSetFinal)

2.08 ACCESSORIES
A. Surge protection:

1. Metal oxide varistors:
a. Provide protection for the VFD against:
1) Line transients: 5,000-volt peak minimum.
2) Line to ground transients: 7,000-volt peak minimum.

B. Conformal coating:

1. Provide conformal coating material applied to electronic circuitry and printed circuit boards to act as protection against moisture, dust, temperature extremes, and chemicals such as H2S and chlorine.

C. Air filters:

1. Mounted on the outside of the VFD enclosure:
a. Replaceable without requiring that the VFD be turned off or the door opened.

2. Located on the front or top of the VFD enclosure:
a. Side or rear mounted air filters are not acceptable.

2.09 FABRICATION (NOT USED)

2.10 FINISHES
A. Enclosure finish shall be manufacturer’s standard gray.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION
A. Anchoring and bracing to structures:

1. Prepare equipment anchor setting template(s) and use to position anchors during construction of supporting structure(s).

2. Install anchors of type and material indicated on approved anchoring designs.

3. Install anchors with embedment indicated on approved anchoring designs.

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details.

B. General:

1. Furnish all cables, conduit, lugs, bolts, and other accessories needed to complete installation of the VFD (free-standing or within motor control center).

2. Assemble and install the VFD in the locations and with the layouts indicated on the Drawings.

3. Perform Work in accordance with the manufacturer’s instructions and shop drawings.

Page 2297 of 3073 ends

Reduced Harmonic Variable Frequency Drives
16265-13 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16265 (BidSetFinal)

4. Furnish components, and equipment as required to complete the installation.

5. Replace any hardware lost or damaged during the installation or handling to provide a complete installation.

6. Install free-standing enclosures on a raised concrete housekeeping pad:
a. Provide structural leveling channels in accordance with the manufacturer’s recommendations to provide proper alignment of the units. b. Weld and/or bolt the VFD frame to the leveling channels.

7. Provide openings in top or bottom of the VFD (free-standing or within motor control center) enclosure for conduit only, no additional openings will be allowed:
a. Improperly cut holes will require that the entire panel be replaced:
1) No hole closers or patches will be allowed.

8. Bundle circuits together and terminate in each unit:
a. Tie with nylon wire ties. As specified in Section 16123 - 600-Volt or Less Wires and Cables.
b. Label all wires at each end with wire numbers shown on the approved Control Drawings.
c. All connections to and from the VFD (free-standing or within motor control center) enclosure must be made via terminal blocks.

3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

B. Installation Verification:

1. Furnish Manufacturer’s Certificate of Installation Verification.

C. Functional Testing:

1. As specified in Section 16950 - Field Electrical Acceptance Tests.

D. Owner Training:

1. Perform Owner training as specified in Section 01756 - Commissioning.

2. Topics:
a. Operation topics limited to:
1) Auto/Manual Control of VFD’s.
b. Maintenance topics limited to:
1) Auto/Manual Control of VFD’s.
2) Troubleshooting VFD’s.

3. Number of sessions:
a. Operations: 1 Session – 1 Hour.
b. Maintenance: 1 Session – 2 Hours.

3.05 FIELD QUALITY CONTROL
A. As specified in Section 16050 - Common Work Results for Electrical.

Page 2298 of 3073 ends

Reduced Harmonic Variable Frequency Drives
16265-14 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16265 (BidSetFinal) B. Provide the services of a VFD manufacturer representative for start-up assistance and training:

1. Inspection and field adjustment:
a. Supervise the equipment installation and confirm controls have been properly installed, aligned, adjusted, and readied for operation. b. Configure AFE drives for all new and existing sources (utility sources and on-site generation in possible operating configurations).

2. Start-up field testing:
a. Provide technical direction for testing, checkout, and startup of the VFD equipment in the field.
b. Under no circumstances are any portions of the drive system to be energized without authorization from the manufacturer's representative. c. Compliance with the following specified parameters shall be verified by the VFD manufacturer:
1) Motor terminal voltage:
a) Make field measurements at the motor connection box. b) Make measurements of the full speed range of the VFD. c) Make measurements with a recording type oscilloscope. 2) Harmonics:
a) Make field measurements at the input terminals of the VFD with and without the VFD in operation.
b) Harmonic testing shall include utility power as well as generator standby power.
c) Make measurements with a recording type harmonic analyzer displaying individual and total harmonic currents and voltages:
(1) Record currents and voltages for a minimum of 10 minutes. (2) Analyzers using snapshots are not acceptable.
d. All utility sources and on-site generation shall be operational for start-up field testing.

3.06 ADJUSTING
A. Make all adjustments as necessary and recommended by the manufacturer, Engineer, or testing firm.

B. Provide the services of a VFD manufacturer factory technician to make all drive parameter and protective device settings:

1. Protective device settings provided by the VFD manufacturer in accordance with the manufacturer of the driven equipment requirements.

2. Provide documentation of VFD settings included but not limited to:
a. Minimum speed.
b. Maximum speed.
c. Skip speeds.
d. Current limit.
e. Acceleration time.
f. Deceleration time.
g. Carrier frequency.

Page 2299 of 3073 ends

Reduced Harmonic Variable Frequency Drives
16265-15 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16265 (BidSetFinal) C. Programming:

1. Manufacturer/supplier may contract with the project Programmer for portions of the tasks below.

2. Provide network communication card between the drive to the Owner's control system as required.

3. Provide all control logic as indicated in the control descriptions.

4. Configure all network communications with applicable security settings, IP addresses and any other addressing tables required to provide a fully functioning system.

5. Coordinate all IP addresses with the Owner.

6. Coordinate data exchange approach for efficient communications to the Owner's control and maintenance systems. This effort will include a coordination meeting to discuss the data exchange approach including formatting and mapping.

END OF SECTION

Page 2300 of 3073 ends
Page 2301 of 3073 ends

Dry-Type Transformers
16272-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal) SECTION 16272

DRY-TYPE TRANSFORMERS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Enclosed dry-type transformers:
a. Rated 1 to 1,000 kilovolt-amperes, single and 3-phase. b. Primary voltage 600 volts and below.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Institute of Electrical and Electronics Engineers (IEEE):

1. 389 - IEEE Recommended Practice for Testing Electronics Transformers and Inductors.

2. C57.12.01 - IEEE Standard General Requirements for Dry-Type Distribution and Power Transformers Including Those with Solid Cast and/or Resin Encapsulated Windings.

3. C57.96 - IEEE Guide for Loading Dry-Type Distribution and Power Transformers.

C. Underwriters Laboratory (UL):

1. 1561 - Standard for Dry-Type General Purpose and Power Transformers.

D. U.S. Department of Energy (DOE):

1. 10 CFR Part 431 - Energy Efficiency Program for Certain Commercial and Industrial Equipment.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

1.04 SYSTEM DESCRIPTIONS
A. Provide 3-phase or 1-phase, 60 hertz dry-type with voltage ratings, kilovolt-ampere capacities, and connections as indicated on the Drawings:

1. Transformers shall provide full capacity at the Project elevation and environmental conditions as specified in Section 01850 - Design Criteria after all derating factors have been applied.

2. Suitable for continuous operation at full rating with normal life expectancy in accordance with IEEE C57.96.

Page 2302 of 3073 ends

Dry-Type Transformers
16272-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal)

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Catalog cutsheets.

2. Nameplate data.

3. Dimensions:
a. Height.
b. Width.
c. Depth.

4. Inrush current.

5. Insulation system and temperature constraints.

6. Number and rating of taps.

7. Sound levels.

8. Connection diagrams:
a. Primary.
b. Secondary.

9. BIL rating.

10. Required clearances.

11. Percent impedance.

12. Efficiency.

13. Certification of full capacity capability at the Project elevation and ambient conditions.

14. For equipment installed in structures designated as seismic design category C, D, E, or F submit the following as specified in Section01610 - Design Criteria:
a. Manufacturer’s statement of seismic qualification with substantiating test data.
b. Manufacturer’s special seismic certification with substantiating test data.

C. Installation instructions:

1. Detail the complete installation of the equipment including rigging, moving, and setting into place.

2. For equipment installed in structures designated as seismic design category A or B:
a. Provide manufacturer’s installation instructions and anchoring details for connecting equipment to supports and structures.

3. For equipment installed in structures designated as seismic design category C, D, E, or F:
a. Provide project-specific installation instructions and anchoring details based on support conditions and requirements to resist seismic and wind loads as specified in Section 01850 - Design Criteria.
b. Submit anchoring drawings with supporting calculations. c. Drawings and calculations shall be stamped by a professional engineer registered in the state where the Project is being constructed.

1.06 QUALITY ASSURANCE (NOT USED)

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

Page 2303 of 3073 ends

Dry-Type Transformers
16272-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. GE by ABB.

2. Jefferson.

3. Schneider Electric.

4. Eaton.

5. ABB.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS
A. Cores:

1. Non-aging, grain-oriented silicon steel.

2. Magnetic flux densities below the saturation point.

B. Windings:

1. High-grade magnet wire.

2. Impregnated assembly with non-hydroscopic, thermo-setting varnish:
a. Cured to reduce hot-spots and seal out moisture.

3. Material electrical grade:
a. Copper.

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. General:

1. 10 kilovolts BIL for 600-volt class windings.

Page 2304 of 3073 ends

Dry-Type Transformers
16272-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal)

2. Sound levels, in accordance with IEEE 389 test conditions, not to exceed:

Kilovolt-Amperes Range Audible Sound Level (db)
1-9 40
10-50 45
51-150 50
151-300 55
301-500 60
501-700 62
701-1000 64

3. Taps:
a. 15 kilovolt-amperes and less:
1) Two 5 percent full capacity primary taps below rated voltage. b. 25 kilovolt-amperes and larger:
1) Four 2.5 percent full capacity primary taps below rated voltage. 2) Two 2.5 percent full capacity primary taps above rated voltage. c. Operated by a tap changer handle or tap jumpers accessible through a panel.

4. Terminals:
a. UL listed for either copper or aluminum conductors.
b. Rated for 75 degrees Celsius.

5. Daily overload capacities, at rated voltage and without reduction in life, in accordance with IEEE C57.96.

B. Transformers less than 15 kilovolt-amperes:

1. Insulation class: 185 degrees Celsius.

2. Temperature rise: 115 degrees Celsius.

C. Energy efficient transformers 15 kilovolt-amperes and larger:

1. Insulation class: 220 degrees Celsius.

2. Temperature rise: 80 degrees Celsius, except as noted below:
a. 150-degree Celsius rise for dry-type transformers located in motor control centers.

3. Efficiency:
a. In accordance with DOE 10 CFR Part 431.

D. Enclosures:

1. Heavy gauge steel:
a. Outdoor: Moisture and water resistant with rodent screens over all openings and in a weather-protected enclosure, NEMA Type 3R. b. Indoor: NEMA Type 2.

2. Louvers to limit coil temperature rise to the value stated above, and case temperature rise to 50 degrees Celsius.

3. Built-in vibration dampeners to isolate the core and coils from the enclosure:
a. Neoprene vibration pads and sleeves.

2.06 COMPONENTS (NOT USED)

Page 2305 of 3073 ends

Dry-Type Transformers
16272-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal)

2.07 ACCESSORIES
A. Nameplates:

1. Non-corrosive metal or UL listed non-metallic:
a. Stamped, engraved or printed with the following information:
1) Phases.
2) Frequency.
3) Kilovolt-ampere rating.
4) Voltage ratings.
5) Temperature rise.
6) Impedance.
7) Insulation class.
8) BIL rating.
9) Connection diagram.
10) Weight.
11) Manufacturer.
12) The identification “transformer”.
13) Classes of cooling.
14) Tap voltage(s).
15) Vector diagram.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES
A. Finish to consist of de-greasing, phosphate cleaning, and an electrodeposited manufacturer’s standard gray enamel rust-inhibiting paint.

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.

B. General:

1. Mounted as indicated on the Drawings.

2. Install where not in direct contact with building structure.

3. Install on single layer vibration pad under the entire mounting surface. a. Manufacturers: The following or equal:
1) Korfund.

Page 2306 of 3073 ends

Dry-Type Transformers
16272-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16272 (BidSetFinal)

4. Make any necessary connections to the enclosure with liquidtight flexible conduit having neoprene gaskets and insulated ground bushings.

5. Ground the enclosure:
a. To an equipment ground conductor in the conduit.
b. To the facility grounding electrode system.

6. Floor mounted transformers:
a. Install transformers on a housekeeping pads.
b. Install transformers with adequate space from walls or other enclosures for proper ventilation in accordance with the manufacturer’s recommendations.

3.04 ERECTION, INSTALLATION, APPLICATIONS, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

B. Factory tests:

1. Applied voltage test to each winding and from each winding to the core:
a. 600-volt class winding 4.5 kilovolt.

2. Induced voltage test at 2 times normal voltage and 400 hertz for 1,080 cycles.

3. Voltage ratio and polarity.

4. Sound level, performed in a test room with ambient sound level not exceeding 24 db.

5. Perform all tests in accordance with UL 1561.

3.08 FIELD QUALITY CONTROL (NOT USED)

3.09 ADJUSTING
A. Set the transformer taps as required to obtain nominal output voltage on the secondary terminals.

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2307 of 3073 ends

Surge Protective Devices
16285-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal) SECTION 16285

SURGE PROTECTIVE DEVICES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. High-energy surge protective devices.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Institute of Electrical and Electronics Engineers (IEEE):

1. C62.41.1 - Guide on the Surge Environment in Low-Voltage (1000 V and less) AC Power Circuits.

2. C62.41.2 - Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits.

3. C62.45 - Recommended Practice on Surge Testing for Equipment Connected to Low-Voltage (1000 V and Less) AC Power Circuits.

4. C62.62- Standard Test Specifications for Surge Protective Devices (SPDs) for Use on the Load Side of the Service Equipment in Low Voltage (1000 V and less) AC Power Circuits.

C. National Fire Protection Agency (NFPA):

1. 20 - Standard for the Installation of Stationary Pumps for Fire Protection.

2. 75 - Standard for the Fire Protection of Information Technology Equipment.

3. 780 - Standard for the Installation of Lightning Protection Systems.

D. Underwriters Laboratory (UL):

1. 1283 - Standard for Electromagnetic Interference Filters.

2. 1449 - Standard for Surge Protective Devices.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Specific definitions:

1. SPD: Surge protective device.

2. SAD: Silicon avalanche diode.

3. MOV: Metal oxide varistor.

4. MCOV: Maximum continuous operating voltage.

5. In: Nominal discharge current.

6. VPR: Voltage protection rating.

7. SCCR: Short circuit current rating.

Page 2308 of 3073 ends

Surge Protective Devices
16285-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal)

1.04 SYSTEM DESCRIPTION
A. Surge protection as indicated on the Drawings.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Furnish complete product data confirming detailed compliance or exception statements to all provisions of this Section.

2. Manufacturer’s catalog cutsheets indicating:
a. Manufacturer and model numbers.
b. Ratings of each SPD including but not limited to:
1) Short circuit current rating.
2) Nominal discharge current.
3) Maximum continuous operating voltage.
4) Voltage protection rating.
5) System voltage.
6) System frequency.
7) Surge current capacity.

3. Submit independent test data from a nationally recognized testing laboratory verifying the following:
a. Overcurrent protection.
b. UL 1449.

C. Shop drawings:

1. Provide electrical and mechanical drawings by the manufacturer that detail:
a. Unit dimensions.
b. Weights.
c. Components.
d. Field connection locations.
e. Mounting provisions.
f. Connection details.
g. Wiring diagram.

D. Operation and maintenance manuals:

1. Provide the manufacturer’s manual with installation, start-up, spare parts lists, and operating instructions for the specified system.

1.06 QUALITY ASSURANCE
A. Provide SPD units that are designed, manufactured, tested and installed in compliance with the following codes and standards:

1. Institute of Electrical and Electronics Engineers (IEEE C62.41.1, C62.41.2, C62.45, C62.62).

2. Federal Information Processing Standards Publication 94 (FIBS PUB 94).

3. National Electrical Manufacturers Association (NEMA).

4. National Fire Protection Association (NFPA 20, 75 and 780).

5. National Electric Code (NFPA 70).

Page 2309 of 3073 ends

Surge Protective Devices
16285-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal)

6. Underwriters Laboratories (UL 1449 4th Edition and UL 1283).

7. International Electrotechnical Commission (IEC 801).

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING
A. Coordinate with and provide SPD equipment to the electrical equipment manufacturer before final assembly and factory testing.

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

B. Extended warranty:

1. Furnish a manufacturer’s full 5-year parts and labor warranty from date of shipment against any part failure when installed in compliance with manufacturer's written instructions, UL listing requirements, and any applicable national, state, or local electrical codes.

2. Warranty shall include:
a. Direct, factory trained employees must be available within 48 hours for assessment of the problem.
b. A 24-hour toll-free 800-number for warranty support.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER'S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Southern Tier Technologies.

2. Eaton.

3. Schneider Electric.

4. GE by ABB.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

Page 2310 of 3073 ends

Surge Protective Devices
16285-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. Provide Type 1 or Type 2 SPD units as required for the locations indicated on the Drawings.

B. Electrical requirements:

1. SPD ratings are to be consistent with the nominal system operating voltage, phase, and configuration as indicated on the Drawings.

2. MCOV:
a. For the SPD and all components in the suppression path (including all MOVs, SADs, and selenium cells): Greater than 115 percent of the nominal system operating voltage.

3. Operating frequency:
a. 47 to 63 hertz.

4. SCCR:
a. 65 kAIC minimum, but not less than the equipment it is connected to as indicated on the Drawings.
b. The SCCR shall be marked on the SPD in accordance with UL 1449 and the NEC.

5. Nominal discharge current In:
a. 20 kA.

6. Maximum VPR:

Modes 240/120 3W 208Y/120 480Y/277 480V
L-N, L-G, N-G 700 700 1,200 1,800
L-L 1,200 1,200 1,800 1,800

7. Peak surge current:
a. Service entrance locations:
1) 240 kA per phase minimum.
2) 120 kA per mode minimum.
b. Branch locations:
1) 120 kA per phase, minimum.
2) 60 kA per mode minimum.

C. Protection modes:

1. Provide SPD protection modes as follows:
a. Line to Neutral (L-N) where applicable.
b. Line to Ground (L-G).
c. Neutral to Ground (N-G), where applicable.

D. Environmental requirements:

1. Storage temperature:
a. -40 degrees to 122 degrees Fahrenheit.

2. Operating temperature:
a. 32 degrees to 140 Fahrenheit.

3. Relative humidity:
a. 5 percent to 95 percent.

Page 2311 of 3073 ends

Surge Protective Devices
16285-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal)

4. Audible noise:
a. Less than 45 dBa at 5 feet (1.5 m).

5. Operating altitude:
a. Zero to 12,000 feet above sea level.

E. Provide surge protective devices that are suitable for application in IEEE C62.41.1, C62.41.2 Category A, B and C3 environments, as tested to IEEE C62.45.

2.06 COMPONENTS
A. Enclosure:

1. Located in electrical equipment as indicated on the Drawings.

B. Internal connections:

1. Provide low impedance copper plates for intra-unit connections:
a. Attach surge modules using bolted connections to the plates for low impedance connections.

2. Size all connections, conductors, and terminals for the specified surge current capacity.

C. Surge diversion modules:

1. MOV:
a. Where multiple MOVs are used in parallel, utilize computer matched MOVs to within 1 volt variance and tested for manufacturer's defects.

D. Overcurrent protection:

1. Individually fuse all components, including suppression, filtering, and monitoring components:
a. Rated to allow maximum specified nominal discharge current capacity. b. Overcurrent protection that limits specified surge currents is not acceptable.

E. Connections:

1. Provide terminals to accommodate wire sizes up to No. 2 AWG.

2.07 ACCESSORIES
A. Unit status indicators:

1. Provide red and green solid-state indicators, with printed labels, on the front cover to redundantly indicate on-line unit status:
a. The absence of the green light and the presence of the red light indicate that surge protection is reduced and service is needed to restore full operation.
b. Indicates the status of protection on each mode or phase.

B. Dry contacts for remote monitoring:

1. Electrically isolated Form C dry contacts (1 A/125 VAC) for remote monitoring of system integrity, and indication of under voltage, phase and/or power loss.

Page 2312 of 3073 ends

Surge Protective Devices
16285-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal) C. Provide an audible alarm which activates under any fault condition.

1. Provide an alarm On/Off switch to silence the alarm.

2. A visible LED will confirm whether alarm is On or Disabled.

3. Locate both switches and the audible alarm on the unit’s front cover.

2.08 MIXES (NOT USED)

2.09 MIXES (NOT USED)

2.10 FABRICATION (NOT USED)

2.11 FINISHES (NOT USED)

2.12 SOURCE QUALITY CONTROL
A. Permanently affix surge rating to the SPD.

B. Perform manufacturer’s standard factory test:

1. Perform testing in accordance with UL 1449.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Follow the manufacturer's recommended installation practices and comply with all applicable codes.

B. Special techniques:

1. Install SPDs internal to equipment with as short and straight conductors including ground conductor as practically possible:
a. Twist the input conductors together to reduce input conductor inductance.

2. Do not subject SPD to insulation resistance testing.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 16950 - Field Electrical Acceptance Tests.

Page 2313 of 3073 ends

Surge Protective Devices
16285-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16285 (BidSetFinal)

3.09 ADJUSTING (NOT USED)

3.10 CLEANING (NOT USED)

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2314 of 3073 ends
Page 2315 of 3073 ends

Electrical Power Monitoring
16290-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16290 (BidSetFinala) SECTION 16290

ELECTRICAL POWER MONITORING
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Power meters and accessories.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. American National Standard Institute (ANSI):

1. C12.20 - Electricity Meters - 0.2 and 0.5 Accuracy Classes.

C. Institute of Electrical and Electronics Engineers (IEEE):

1. C57.13.6 - Standard for High Accuracy Instrument Transformers.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Specific definitions:

1. FS - Full Scale.

2. RDG - Of Reading.

3. SSM - Solid State Multifunction Power Meter.

4. THD - Total Harmonic Distortion.

1.04 SYSTEM DESCRIPTION (NOT USED)

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Power meter data including but not limited to:
a. Power requirements.
b. Communications protocols.
c. Input/outputs.
d. Dimensions.
e. Measurement functions.
f. Front panel controls.
g. Display characteristics.

2. Accessory data:
a. Test switch dimensions and wiring diagrams.

Page 2316 of 3073 ends

Electrical Power Monitoring
16290-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16290 (BidSetFinala) C. Operation and maintenance manuals:

1. Descriptive and technical bulletins and sales aids edited to reflect only the equipment to be provided and covering each of the components in the system.

2. A maintenance section including all instruction leaflets and technical data necessary to setup, change setup and maintain the power meters.

3. Original licensed copies of all software and software manuals.

D. Configuration files and reports:

1. Settings including but not limited to:
a. Device tag name.
b. IP addresses.
c. Alarm settings.
d. Time synchronization settings.
e. Security settings.

2. Configuration files are to be provided in the selected manufacturer’s native format.

3. Configuration reports are to be submitted in .PDF format, listing each configured parameter setting and description of each parameter.

1.06 QUALITY ASSURANCE (NOT USED)

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER'S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Allen-Bradley.

2. Eaton.

3. ABB.

4. Schneider Electric.

5. GE Multilin.

Page 2317 of 3073 ends

Electrical Power Monitoring
16290-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16290 (BidSetFinala)

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS
A. Power meters:

1. Power meter type 2 (SSM2) device which shall include at a minimum:
a. Individual phase currents, plus or minus 0.3 percent FS. b. Phase-to-phase and phase-to-neutral voltages, plus or minus 3 percent FS.
c. Watts, VARs, VA, plus or minus 6 percent FS.
d. Watt-hours 0.6 percent FS; VAR-hours 0.6 percent FS; VA-hours

0.6 percent FS.
e. PF apparent 1 percent FS; PF displacement 1 percent FS. f. Frequency 0.17 percent FS.
g. THD:
1) Voltage - 31st harmonic.
2) Current - 31st harmonic.
h. Demand:
1) Ampere, plus or minus 0.3 percent FS.
2) Watt, VAR, VA, plus or minus 0.6 percent FS.
i. Minimum and maximum values:
1) Volts (L-L), volts (L-N), current (L), watts, VARs, VA. 2) PF (apparent and displacement).
3) Frequency.
4) THD-amps, THD-volts.
5) Demand:
a) Ampere, watt, VAR, VA.
j. Trend analysis:
1) 2 selectable parameters.
k. Other features:
1) 3 form C relays, rated 10 amps.
l. Synch-input kilowatt utility.
m. Graphic LCD with LED backlight:
1) Seven lines, 147 characters.
n. Ethernet connection:
1) Provide EtherNet/IP communication.

Page 2318 of 3073 ends

Electrical Power Monitoring
16290-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16290 (BidSetFinala)

2.07 ACCESSORIES
A. Current transformers:

1. Ring type current transformers:
a. Suitable for service within low or medium voltage equipment as indicated on the Drawings.
b. Designed to have a mechanical and thermal rating to withstand short-circuit current, stresses, and heating effects equal to the rating of the equipment of the application.

2. Current ratio: As indicated on the Drawings.

3. Rated in accordance with IEEE C57.13.6 with accuracy of the current transformers suitable for relay accuracy class and rated for 200 percent burden for the required connected devices.

4. Identify polarity with standard marking or symbols.

5. Capable of carrying rated primary current continuously without damage.

6. Install secondary wiring from current transformers in a suitable wiring trough, or conduit to proper short-circuiting type terminal blocks for connection to relays, instruments, and other devices.

B. Test switches:

1. Ten pole.
a. 3 potential poles, for phase voltage.
1) 600V rated.
b. Four 30A, non-shorting current poles, for neutral current and let-thru phase currents.
c. Three 30A, shorting current poles, for shorting phase currents.

2. Base to be made of electrical grade plastic.

3. Barriers between poles for pole isolation and separation.

4. Clear cover encapsulating the test switch to enable visual verification of each switch position.

5. Knife-blade type switches, accepting a horizontal gang interlocking bar.

6. Screw type terminals on each switch.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install power meters in the electrical equipment as indicated on the Drawings.

Page 2319 of 3073 ends

Electrical Power Monitoring
16290-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16290 (BidSetFinala)

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL (NOT USED)

3.09 ADJUSTING (NOT USED)

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2320 of 3073 ends
Page 2321 of 3073 ends

Electrical System Studies
16305-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) SECTION 16305

ELECTRICAL SYSTEM STUDIES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Short-circuit fault analysis study.

2. Protective device coordination study.

3. Arc-flash hazard study.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Institute of Electrical and Electronics Engineers (IEEE):

1. 1584 - IEEE Guide for Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculations Study in Accordance with IEEE Std 1584 (TM).

C. National Fire Protection Association (NFPA).

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

1.04 SYSTEM DESCRIPTION
A. General study requirements:

1. Scope:
a. The short-circuit fault analysis, protective device coordination, and arc-flash hazard studies shall include all new and existing equipment in the power distribution system including, but not limited to:
1) Utility equipment.
2) All electrical equipment including:
a) Dry-type transformers.
b) Switchgears.
c) Switchboards.
d) MCCs.
e) 480-volt panelboards.
f) 240 and 208 volt panelboards.
3) Generators.
4) Motors.
5) Vendor control panels.
6) HVAC equipment.

Page 2322 of 3073 ends

Electrical System Studies
16305-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) b. Study scenarios:
1) The studies shall include all possible electrical system configurations, for example:
a) Operation on normal (utility) source.
b) Operation on generator source.
c) Parallel operation on normal and generator sources.
d) A side feeder breaker close, and B side feeder breaker open for gears with A and B feeder configuration (only for WWTP). e) A side feeder breaker open, and B side feeder breaker close for gears with A and B feeder configuration (only for WWTP). f) Obtain, for all equipment, the required data for preparation of the study including, but not limited to:
c. Transformer kilovolt-ampere (kVA) and impedances.
d. Generator impedances.
e. Generator decrement curves.
f. Bus withstand ratings.
g. Cable and bus data.
h. Protective device taps, time dials, instantaneous pickups, and time-delay settings.
i. As-built lengths for all new wire and cable installations covered by the studies.

2. Obtain the Electric Utility information on the minimum and maximum available fault current, minimum and maximum utility impedances, utility protective device settings including manufacturer and model number, interrupting ratings, X/R ratios, and model information one level above the point of connection:
a. Utility tolerances and voltage variations.

3. The individual performing the studies shall visit the site and collect all necessary field data in order to perform and complete comprehensive electrical system studies.

4. Obtain equipment layouts and configurations from the manufacturer’s final submittal requirements and project layout drawings as required.

5. Bus and conductor data:
a. Use impedances of the actual installed or specified conductors, unless otherwise indicated.
b. Use cable and bus impedances calculated at 25 degrees Celsius, unless otherwise indicated.
c. Use 600-volt cable reactance based on typical dimensions of actual installed or specified conductors, unless otherwise indicated. d. Use bus withstand values for all equipment having buses. e. Use medium-voltage cable reactance based on typical dimensions of shielded cables with 133-percent insulation levels, unless otherwise indicated.

6. Motors:
a. Each motor shall be individually modeled:
1) Grouping of motors for fault contribution current is not acceptable. b. Motors with variable frequency drives (VFDs) may be assumed to have no contribution to fault current, unless VFDs are equipped with Bypass Contactors.
1) If VFDs are equipped with bypass contactors, perform the fault current and arc flash study assuming all of bypass contactors are in the closed position.

Page 2323 of 3073 ends

Electrical System Studies
16305-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal)

7. Use the equipment, bus, and device designations as indicated on the Drawings for all studies.

8. Studies shall include, but not be limited to, all equipment and connections shown on Contract Drawing:
a. 03E01: WTP MODIFIED OVERALL ONE-LINE DIAGRAM.
b. 03E06: SWBD70281 AND SWBD70282 ONE-LINE DIAGRAM.

B. Short-circuit fault analysis study additional requirements:

1. The short-circuit fault analysis shall be performed and submitted in 2 phases:
a. Initial short-circuit fault analysis:
1) Based on the Contract Documents and Electric Utility information. 2) The initial short-circuit fault analysis study shall indicate the estimated available short-circuit current at the line side terminals of each piece of equipment covered by the scope of the study. a) Measure conductor lengths from the Drawings. Use of arbitrary short conductor lengths is not allowed.
3) Provide a list of assumptions used in the initial study. b. Final short-circuit fault analysis:
1) The final short-circuit fault analysis shall modify the initial analysis as follows:
a) Utilize the actual equipment provided on the project. b) Utilize conductor lengths based on installation.

2. Calculate 3-phase bolted fault, line-to-line fault, line-to-ground fault, double line-to-ground fault, short-circuit 1/2 cycle momentary symmetrical and asymmetrical RMS, 1-1/2 to 4 cycle interrupting symmetrical RMS, and 30-cycle steady-state short-circuit current values at each piece of equipment in the distribution system.

3. Evaluate bus bracing, short-circuit ratings, fuse interrupting capacity and circuit-breaker-adjusted interrupting capacities against the fault currents, and calculate X/R values:
a. Identify and document all devices and equipment as either inadequate or acceptable.

4. Calculate line-to-ground and double line-to-ground momentary short-circuit values at all buses having ground-fault devices.

5. Provide calculation methods, assumptions, one-line diagrams, and source impedance data, including utility X/R ratios, typical values, recommendations, and areas of concern.

C. Protective device coordination study additional requirements:

1. Furnish protective device settings for all functions indicated on the Drawings including, but not limited to:
a. Current.
b. Voltage:
1) Provide settings for all voltage relays based upon actual utility and generator tolerances and specifications.
c. Frequency:
1) Provide settings for all frequency relays based upon actual utility and generator tolerances and specifications.
d. Negative sequence.
e. Reverse power.

Page 2324 of 3073 ends

Electrical System Studies
16305-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) f. Machine protection functions:
1) Provide settings for all motor and generator protective relays based on the manufacturer’s recommended protection requirements.

2. Provide log-log form time-current curves (TCCs) graphically indicating the coordination proposed for the system:
a. Include with each TCC a complete title and one-line diagram with legend identifying the specific portion of the system covered by the particular TCC:
1) Typical TCCs for identical portions of the system, such as motor circuits, are acceptable as allowed by the Engineer.
b. Include a detailed description of each protective device identifying its type, function, manufacturer, and time-current characteristics:
1) These details can be included on the TCC.
c. Include a detailed description of each protective device tap, time dial, pickup, instantaneous, and time delay settings:
1) These details can be included on the TCC.

3. TCCs shall include all equipment in the power distribution system where required to demonstrate coordination. Include utility relay and fuse characteristics, medium-voltage equipment protective relay and fuse characteristics, low-voltage equipment circuit breaker trip device characteristics, transformer characteristics, motor and generator characteristics, and characteristics of other system load protective devices:
a. Include all devices down to the largest branch circuit and largest feeder circuit breaker in each motor control center, main breaker in branch panelboards, and fused disconnect switches.
b. Provide ground fault TCCs with all adjustable settings for ground fault protective devices.
c. Include manufacturing tolerances and damage bands in plotted fuse and circuit breaker characteristics.
d. On the TCCs, show transformer full load currents, transformer magnetizing inrush, ANSI transformer withstand parameters, and transformer damage curves.
e. Cable damage curves.
f. Terminate device characteristic curves at a point reflecting the maximum symmetrical or asymmetrical fault current to which the device is exposed based on the short-circuit fault analysis study.
g. Coordinate time interval medium-voltage relay characteristics with upstream and downstream devices to avoid nuisance tripping.

4. Site generation: When site generation (including cogeneration, standby, and emergency generators) is part of the electrical system, include phase and ground coordination of the generator protective devices:
a. Show the generator decrement curve and damage curve along with the operating characteristic of the protective devices.

5. Suggest modifications or additions to equipment rating or settings in a tabulated form.

D. Arc-flash hazard study additional requirements:

1. Include the calculated arc-flash boundary and incident energy (calories/square centimeter) at each piece of equipment in the distribution system:
a. Perform study with 15 percent arcing fault variation as defined by IEEE 1584.

Page 2325 of 3073 ends

Electrical System Studies
16305-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) b. Perform arc-flash calculations at minimum and maximum utility and generator fault contributions.
c. Perform arc-flash calculations for both the line side and load side of the switchgear, switchboard, motor control center, and panelboard main breakers.
d. Perform arc-flash calculations for all short-circuit scenarios with all motors on for 3 to 5 cycles and with all motors off.

2. Provide executive summary of the study results:
a. Provide summary based upon worst case results.

3. Provide a detailed written discussion and explanation of the tabulated outputs:
a. Include all scenarios.

4. Provide alternative device settings to allow the Owner to select the desired functionality of the system:
a. Minimize the arc-flash energy by selective trip and time settings for equipment maintenance purposes.
b. Identify the arc-flash energy based upon the criteria of maintaining coordination and selectivity of the protective devices.

E. Electrical system study meetings:

1. The individual conducting the short-circuit fault analysis, protective device coordination, and the arc-flash hazard studies shall meet with the Owner and Engineer 3 times.

2. The purpose of the 3 meetings is as follows:
a. Initial meeting:
1) Meet with the Owner and Engineer to discuss the scope of the studies.
a) Confirm assumptions to be used in the electrical system study with the Owner including but not limited to:
(1) Maximum protective device fault clearing time.
2) Discuss the Owner’s operational requirements for both normal operation and maintenance.
b. Preliminary results meeting:
1) This meeting will be held after the studies have been completed, reviewed, and accepted by the Engineer.
2) The purpose of this meeting is to inform the Owner of the results of the study and impacts on normal operation and maintenance including:
a) Protective device coordination problems and recommended solutions.
b) Explanation of the arc-flash hazard study results and its potential impact on operations.
c) Recommendations for reduction of arc-flash category levels including reduction of protective device settings or changes in operational practices.
c. Final meeting:
1) Discuss changes to the studies based on the previous meeting. 2) Discuss with the Owner how changes to the electrical system may change the arc-flash hazard category.
d. Deliver the final report after substantial completion.

Page 2326 of 3073 ends

Electrical System Studies
16305-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal)

3. The meetings will be at the Owner’s facility:
a. Provide a minimum of 3-weeks’ notice to the Owner and Engineer in advance of the projected meeting date.
b. Submit a draft of the meeting agenda when each meeting is requested.

4. Meeting materials:
a. Prepare and provide the following materials:
1) Meeting agenda. Include, at a minimum, the scope of the meeting, estimated time length for the meeting, and meeting goals. 2) 6 copies of the project one-line diagrams for the initial meeting. 3) 6 copies of the submitted studies.

F. Owner training:

1. Training shall include, but is not limited to:
a. Introduction and basics of NFPA 70E: At least 1 hour. b. Detailed review of the electrical system study for at least 2 hours. c. Questions and Answers period: 0.5 hours.

G. By virtue of the fact that this is a professional study, the Owner reserves the right to modify the requirements of the study to comply with its operational requirements.

The protective device coordination study and the arc-flash hazard study shall be modified based on the results of the meetings with the Owner.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Initial studies and reports:

1. Include the following in the initial short-circuit current report:
a. List of all devices included in the studies.
b. A description of all operating scenarios.
c. Form and format of arc-flash labels.

C. Final studies and reports:

1. Format and quantity:
a. Provide 6 bound copies of all final reports.
b. Provide 3 complete sets of electronic files on CD or DVD media, including the electrical system model(s), configuration files, custom libraries, and any other files used to perform the studies and produce the reports. Also provide an electronic version of the bound reports in PDF format. c. Provide the number of copies specified in Section 01330 - Submittal Procedures.

2. Include the sections below in the final report:
a. Copies of correspondence and data obtained from the electric utility company.
b. Letter certifying the inspection and verification of existing equipment. c. One-line diagrams:
1) The following information shall be included at a minimum:
a) Motor horsepower.
b) Transformer data:
(1) kVA.
(2) Configuration.

Page 2327 of 3073 ends

Electrical System Studies
16305-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) c) Cable data:
(1) Insulation.
(2) Size.
(3) Length.
2) One-line diagrams shall be fully legible at 11-inch by 17-inch size. d. Include in the short-circuit fault analysis study:
1) Descriptions, purpose, basis, assumptions, recommendations, and scope of the study.
2) Normal system connections and those that result in maximum fault conditions.
3) Tabulation of circuit breaker, fuse, and other protective device ratings compared to maximum calculated short-circuit duties.
4) Fault current calculations for the cases run including a definition of terms and guide for interpretation of computer software printouts. e. Protective device coordination study shall include:
1) Descriptions, purpose, basis, assumptions, recommendations, and scope of the study.
2) List all requirements used in the selection and setting criteria for any protective devices.
3) Manufacturer’s time-current curves for circuit breakers, fuses, motor circuit protectors, and other protective devices for all new equipment. 4) TCCs graphically indicating the coordination proposed for the system on log-log graphs:
a) All TCCs shall be in color.
5) Tabulation of relay, fuse, circuit breaker, and other protective devices in graphical form with a one-line diagram to display area coordination.
6) Where coordination could not be achieved, an explanation shall be included in the report to support the statement along with recommendations to improve coordination. Recommended
equipment modifications or settings shall be in a tabulated form. f. Include in the arc-flash hazard study:
1) Descriptions, purpose, basis, assumptions, recommendations, and scope of the study.
2) Normal system connections and those that result in maximum arc-flash conditions.
3) Arc-flash raw data, calculations, and assumptions.
4) Arc-flash label data:
a) Identifying the content of each label.
b) Identifying the location of each label.

D. Certification:

1. Submit written certification, sealed and signed by the professional engineer conducting the study, equipment supplier, and electrical subcontractor stating that the data used in the study is correct.

E. Submit the credentials of the individual(s) performing the study and the individual in responsible charge of the study.

F. The Engineer will review all studies and reports. After review, the Engineer will make recommendations and/or require changes to be made to the short-circuit fault

Page 2328 of 3073 ends

Electrical System Studies
16305-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) analysis, protective device coordination, or arc-flash hazard studies. These changes shall be provided as part of the scope of work.

G. Submit course outline for Owner’s training.

1.06 QUALITY ASSURANCE
A. Qualifications of the entity responsible for electrical system studies:

1. The studies shall be performed, stamped, and signed by a professional engineer registered in the state where the project is located.

2. A minimum of 5 years of experience in power system analysis is required for the individual in responsible charge of the studies.

3. The short-circuit fault analysis, protective device coordination, and arc-flash hazard studies shall be performed with the aid of a digital computer program:
a. Point-to-point calculations are not acceptable.

B. The study shall be performed by an independent firm

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT/SITE CONDITIONS (NOT USED)

1.09 SEQUENCING
A. Below is an outline of the typical work sequence. Proposed changes to the work sequence may be reviewed and approved by the Engineer.

1. Site visit to gather data on the existing facility systems for all studies:
a. Make multiple trips as required to obtain all data for the short-circuit fault analysis, protection device coordination, and arc flash hazard studies.

2. Initial electrical system study meeting.

3. Submit the initial short-circuit fault analysis study before submittal of any electrical equipment.
a. Only the initial short-circuit results will be reviewed.

4. Submit the preliminary short-circuit fault analysis, protective device coordination, and arc-flash hazard studies after the approval of all electrical equipment.

5. Second electrical system study meeting for preliminary results.

6. Update the model with all changes to the electrical system made during start-up and commissioning.

7. Final arc-flash meeting and final short-circuit fault analysis, protective device coordination, and arc-flash hazard studies.

8. Submit the final electrical system studies.

9. Label equipment with approved arc-flash labels.

10. Owner’s training.

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY (NOT USED)

1.12 SYSTEM START-UP (NOT USED)

Page 2329 of 3073 ends

Electrical System Studies
16305-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Electrical system study software: One of the following or equal:

1. Operation Technology, Inc., ETAP.

2. SKM Systems Analysis, Powertools.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS
A. Arc-flash hazard labels:

1. Dimensions:
a. Minimum 5 inches by 3.5 inches.

2. Materials:
a. Polyester with polyvinyl polymer over-laminate.
b. Self-adhesive.
c. Resistant to:
1) UV.
2) Chemicals and common cleaning solvents.
3) Scuffing.
4) Wide temperature changes.

3. Contents:
a. Short-circuit bus identification.
b. Calculated incident energy (calories/square centimeter) range:
1) Based on worst-case study results.
c. Site specific personnel protective equipment level number. d. Arc-flash protection boundary.
e. Shock hazard boundary:
1) The Contractor may provide separate labels for indication of the shock hazard boundary.
f. Fed from:
1) Identify the tag number of the upstream equipment providing power.

4. Color scheme:
a. For locations above 40 calories/square centimeter:
1) White label with red “DANGER” strip across the top.
2) Black lettering.

Page 2330 of 3073 ends

Electrical System Studies
16305-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal) b. For locations below 40 calories/square centimeter:
1) White label with orange “WARNING” strip across the top. 2) Black lettering.

2.07 ACCESSORIES (NOT USED)

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. After review and acceptance of the arc-flash hazard study by the Engineer, install all arc-flash hazard labels:

1. Install labels at all locations required by NFPA, ANSI, or IEEE standards.

2. At a minimum, install labels in the following locations:
a. The front of each main or incoming service compartment. b. The front of each low-voltage switchgear section.
c. The front of each accessible auxiliary or conductor compartment. d. Each accessible rear or side vertical section.
e. Each motor control center vertical section.
f. Each panelboard covered by the study.
g. Each control panel, individual starter or VFD, or other equipment covered by the scope of the study.

B. After review and acceptance of the draft arc-flash hazard study and protective device coordination study by the Engineer, adjust protective device settings per final study prior to equipment energization.

1. Devices that require power for configuration may be set during energization, but before any subfed loads are energized.

2. Ensure that settings for upstream equipment are set prior to energizing downstream devices.

3.04 ERECTION, INSTALLATION, APPLICATION, AND CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

Page 2331 of 3073 ends

Electrical System Studies
16305-11 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16305 (BidSetFinal)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL
A. The individual performing the arc-flash hazard study shall direct the installation of the arc-flash hazard labels:

1. Remove and replace any improperly applied labels.

2. Repair the equipment finish damaged by removal of any label.

3. Install labels level or plumb across the entire dimension of the label.

3.09 ADJUSTING (NOT USED)

3.10 CLEANING (NOT USED)

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2332 of 3073 ends
Page 2333 of 3073 ends

Disconnect Switches
16411-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal) SECTION 16411

DISCONNECT SWITCHES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Fusible and non-fusible disconnect switches.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. National Electric Manufacturer’s Association (NEMA):

1. KS 1-2001 - Enclosed and Miscellaneous Distribution Equipment Switches (600 Volts Maximum).

C. Underwriters Laboratories Inc. (UL):

1. 20 - General-Use Snap Switches.

2. 98 - Enclosed and Dead-Front Switches.

3. 508 - Standard for Industrial Control Equipment.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Specific definitions:

1. Safety switches and disconnect switches are to be considered synonymous.

1.04 SYSTEM DESCRIPTION
A. Provide heavy-duty type disconnect switches as indicated on the Drawings and specified in the Contract Documents.

B. Provide disconnect switches with the number of poles, voltage, current, short circuit, and horsepower ratings as required by the load and the power system.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Manufacturer.

2. Manufacturer's specifications and description.

3. Ratings:
a. Voltage.
b. Current.

Page 2334 of 3073 ends

Disconnect Switches
16411-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal) c. Horsepower.
d. Short circuit rating.

4. Fused or non-fused.

5. NEMA enclosure type.

6. Dimensions:
a. Height.
b. Width.
c. Depth.

7. Weight.

8. Cross-referenced to the disconnect schedule indicated on the Drawings.

C. Shop drawings:

1. Manufacturer's installation instructions:
a. Indicate application conditions and limitations of use stipulated by product testing agency specified under Quality Assurance, Regulatory Requirements below.
b. Include instructions for storage, handling, protection, examination, preparation, installation, and operation of product.

2. For each switch, indicate nameplate inscription, including voltage, circuit, fuse size (if applicable), and equipment served.

D. Installation instructions:

1. Provide anchorage instructions and requirement based on the seismic requirements at the Project Site as specified in Section 01850 - Design Criteria and calculations:
a. Stamped by a professional engineer registered in the state where the Project is being constructed.

1.06 QUALITY ASSURANCE
A. Regulatory requirements:

1. NEMA Type KS1 - Enclosed and Miscellaneous Distribution Switches (600 V Maximum).

2. UL 98 - Enclosed and Dead-Front Switches.

B. Disconnect switches shall be UL listed and labeled.

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING
A. Conduct the initial fault current study as specified in Section 16305 - Electrical System Studies and submit results for Engineer’s review.

B. After successful review of the initial fault current study, submit complete equipment submittal.

Page 2335 of 3073 ends

Disconnect Switches
16411-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER'S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Schneider Electric.

2. Eaton.

3. GE by ABB.

4. Siemens.

5. Appleton.

6. Crouse-Hinds.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. Switch mechanism:

1. Quick-make, quick-break heavy-duty operating mechanisms:
a. Provisions for padlocking the switch in the Off position. b. A minimum of 90-degree handle travel position between Off and On positions:
1) Provide handle position indicators to identify the handle position. c. Full cover interlock to prevent opening of the switch door in the On position and to prevent closing the switch mechanism with the door open:
1) With an externally operated override.

B. Switch interior:

1. Switch blades visible when the switch is Off and the cover is open.

2. Lugs:
a. Front accessible.
b. Removable.
c. UL listed for 60/75-degree Celsius copper conductors.

3. Current carrying parts completely plated to resist corrosion.

Page 2336 of 3073 ends

Disconnect Switches
16411-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal)

4. Removable arc suppressors to facilitate easy access to line side lugs.

5. Furnish equipment ground kits for every switch.

C. Fused switches:

1. Furnish with fuses as indicated on the Drawings:
a. Provide fuses as specified in Section 16494 - Low Voltage Fuses.

2. UL approved for field conversion from standard Class H fuse spacing to Class J fuse spacing:
a. Ratings 100 amperes through 600 amperes at 240 volts. b. Ratings 30 amperes through 600 amperes at 600 volts. c. Provide spring reinforced and plated fuse clips.

D. Ratings:

1. UL horsepower rated for AC or DC with the rating not less than the load served.

2. Current:
a. 30 to 1,200 amperes.

3. Voltage:
a. 250 volts AC, DC.
b. 600 volts (30 A to 200 A, 600 volts DC).

4. Poles:
a. 2, 3, 4, and 6 poles.

5. UL listed short circuit ratings:

6. Where not indicated on the Drawings, provide switches with the NEMA ratings specified in Section 16050 - Common Work Results for Electrical for the installed location.

E. Size, fusing and number poles as indicated on the Drawings or as required:

1. Provide solid neutral where indicated on the Drawings.

2.06 COMPONENTS (NOT USED)

2.07 ACCESSORIES
A. Disconnect switches to have provisions for a field installable “B” type electrical interlock for position indication as indicated on the Drawings.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)

Page 2337 of 3073 ends

Disconnect Switches
16411-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal) PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.

B. General:

1. Use Myers hubs or bolt-on hubs for all conduit penetrations on NEMA Type 12, Type 4, and Type 4X enclosures.

2. Provide all mounting brackets, stands, supports and hardware as required:
a. Match finish and materials for all brackets, stands, and hardware with the switch installed.
b. Provide adequate supporting pillar(s) for disconnect switches in accordance with the approved seismic calculations, and locate aboveground or above decks, where there is no structural wall or surface for box.

3. When possible, mount switches rigidly to exposed building structure or equipment structural members:
a. For NEMA Type 4 and Type 4X locations, maintain a minimum of 7/8 inch air space between the enclosure and supporting surface. b. When mounting on preformed channel, position channel vertically so that water may freely run behind the enclosure.

4. Provide a nameplate for each disconnect switch:
a. Provide per requirements specified in Section 16075 - Identification for Electrical Systems.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 16050 - Common Work Results for Electrical.

3.09 ADJUSTING (NOT USED)

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

Page 2338 of 3073 ends

Disconnect Switches
16411-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16411 (BidSetFinal)

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2339 of 3073 ends

Low Voltage Molded Case Circuit Breakers
16412-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16412 (BidSetFinal) SECTION 16412

LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Low voltage molded case circuit breakers.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Underwriter’s Laboratories (UL):

1. 489 - Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

B. In accordance with UL 489.

1.04 SYSTEM DESCRIPTION
A. Molded case thermal magnetic, solid-state, or motor circuit protector type circuit breakers as indicated on the Drawings and connected to form a completed system.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Catalog cutsheets.

2. Manufacturer’s time-current curves for all molded case circuit breakers furnished.

1.06 QUALITY ASSURANCE
A. Low voltage molded case circuit breakers shall be UL listed and labeled.

1.07 DELIVERY, STORAGE AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

Page 2340 of 3073 ends

Low Voltage Molded Case Circuit Breakers
16412-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16412 (BidSetFinal)

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Eaton.

2. GE by ABB.

3. Schneider Electric.

4. ABB.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS
A. General:

1. Conforming to UL 489.

2. Operating mechanism:
a. Quick-make, quick-break, non-welding silver alloy contacts. b. Common Trip, Open and Close for multi-pole breakers such that all poles open and close simultaneously.
c. Mechanically trip free from the handle.
d. Trip indicating handle - automatically assumes a position midway between the manual ON and OFF positions to clearly indicate the circuit breaker has tripped.
e. Lockable in the "OFF" position.

3. Arc extinction:
a. In arc chutes.

4. Voltage and current ratings:
a. Minimum ratings as indicated on the Drawings.
b. Minimum frame size 100A.

Page 2341 of 3073 ends

Low Voltage Molded Case Circuit Breakers
16412-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16412 (BidSetFinal)

5. Interrupting ratings:
a. Minimum ratings as indicated on the Drawings.
b. Modify as required to meet requirements of the short circuit fault analysis - as specified in Section 16305 - Electrical System Studies. c. Not less than the rating of the assembly (panelboard, switchboard, motor control center, etc.).

B. Motor circuit protectors:

1. Instantaneous only circuit breaker as part of a listed combination motor controller.

2. Each pole continuously adjustable in a linear scale with ‘LO’ and ‘HI’ settings factory calibrated.

2.05 EQUIPMENT (NOT USED)

2.06 COMPONENTS
A. Terminals:

1. Line and load terminals suitable for the conductor type, size, and number of conductors in accordance with UL 489.

B. Case:

1. Molded polyester glass reinforced.

2. Ratings clearly marked.

C. Trip units:

1. Provide thermal magnetic or solid-state trip units as indicated on the Drawings.

2. Thermal magnetic:
a. Instantaneous short circuit protection.
b. Inverse time delay overload.
c. Ambient or enclosure compensated by means of a bimetallic element.

3. Solid state:
a. With the following settings as indicated on the Drawings. 1) Adjustable long time current setting.
2) Adjustable long time delay.
3) Adjustable short time pickup.
4) Adjustable short time delay.
5) Adjustable instantaneous pickup.
6) Adjustable ground fault pickup as indicated on the Drawings. 7) Adjustable ground fault delay as indicated on the Drawings.

D. Provide ground fault trip devices as indicated on the Drawings.

E. Molded case circuit breakers for use in panelboards:

1. Bolt-on type:
a. Plug-in type breakers are not acceptable.

2. Ground fault trip devices as indicated on the Drawings.

Page 2342 of 3073 ends

Low Voltage Molded Case Circuit Breakers
16412-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16412 (BidSetFinal)

2.07 ACCESSORIES
A. Lockable handle:

1. Provide assembly to lock operating handle in ‘OPEN’ position.

2. Where a molded case circuit breaker is located in a dedicated enclosure, provide a lockable handle. Reference the Electrical Specifications for additional locking requirements associated with other mounting installations.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL
A. Test breakers in accordance with:

1. UL 489.

2. Manufacturer’s standard testing procedures.

PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install breakers to correspond to the accepted shop drawings.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL (NOT USED)

3.09 ADJUSTING
A. Adjust trip settings in accordance with Protective Device Coordination Study as accepted by the Engineer and in accordance with manufacturer’s recommendations.

B. Adjust motor circuit protectors in accordance with NEC and the manufacturer’s recommendation based on the nameplate values of the installed motor.

Page 2343 of 3073 ends

Low Voltage Molded Case Circuit Breakers
16412-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16412 (BidSetFinal)

3.10 CLEANING (NOT USED)

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2344 of 3073 ends
Page 2345 of 3073 ends

Motor Starters
16422-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) SECTION 16422

MOTOR STARTERS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Motor starters and contactors.

1.02 REFERENCES
A. Abbreviations:

1. FVNR: Full voltage non-reversing.

2. FVR: Full voltage reversing.

3. PWS: Part winding start.

4. RVAT: Reduced voltage auto transformer.

5. RVSS: Reduced voltage solid state.

6. TS1W: 2 speed 1 winding (consequent pole).

7. TS2W: 2 speed 2 winding.

B. Definitions:

1. Overload relay class: A classification of an overload relay time current characteristic by means of a number which designates the maximum time in seconds at which it will operate when carrying a current equal to 600 percent of its current rating.

C. Standards:

1. Institute of Electrical and Electronics Engineers (IEEE).

2. International Electrotechnical Commission (IEC):
a. 801-1 - Electromagnetic Compatibility for Industrial-Process Measurement and Control Equipment - Part 1: General Information.
b. 947-4 - Low-Voltage Switchgear and Control Gear.

3. National Electrical Manufacturer's Association (NEMA):
a. 250 - Enclosures for Electrical Equipment (1000 V Maximum). ICS 2-230 - Industrial Control and Systems: Controllers, Contactors, and Overload Relays Rated 600 V.

4. Underwriters Laboratories, Inc. (UL):
a. 508 - Standard for Industrial Control Equipment.
b. 508A - Standard for Industrial Control Panels.

1.03 DELEGATED DESIGN
A. As specified in Section 01357 - Delegated Design Procedures.

B. Anchoring and bracing.

Page 2346 of 3073 ends

Motor Starters
16422-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal)

1.04 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures:

1. Submit motor starter data with equipment submittal.

B. Product data:

1. Manufacturer.

2. Catalog cutsheets.

3. Technical information.

4. Complete nameplate schedule.

5. Complete bill of material.

6. List of recommended spare parts.

7. Confirmation that the overload relay class for each starter meets the requirements of the equipment and motor supplier.

8. Electrical ratings:
a. Phase.
b. Wire.
c. Voltage.
d. Ampacity.
e. Horsepower.

9. Furnish circuit breaker submittals as specified in Section 16412 - Low Voltage Molded Case Circuit Breakers.

C. Shop drawings:

1. Elementary and schematic diagrams:
a. Provide 1 diagram for every starter and contactor.
b. Indicate wire numbers for all control wires on the diagrams:
1) Wire numbering as specified in Section 16075 - Identification for Electrical Systems.
c. Indicate interfaces with other equipment on the drawings.

D. Delegated design submittals:

1. Anchoring and bracing: Provide project-specific calculations based on support conditions and requirements to resist loads specified in Section 01850 - Design Criteria:
a. To structures for equipment installed in structures designated as seismic design category C, D, E, or F.
b. For equipment installed outdoors.
c. For wall mounted equipment weighing 125 pounds or more.

E. Commissioning submittals:

1. As specified in Section 01756 - Commissioning, including the following:
a. Manufacturer’s representative qualifications.
b. Certificates:
1) Requirements as specified in this Section.
c. Test Plans:
1) Test requirements as specified in this Section.
d. Test Reports.
e. Manufacturer’s representatives field notes and data. f. Owner training.

Page 2347 of 3073 ends

Motor Starters
16422-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) F. Operation and maintenance manuals:

1. Submit complete operating and maintenance instructions presenting full details for care and maintenance of equipment furnished or installed under this Section. Including but not limited to:
a. Electrical ratings:
1) Phase.
2) Wire.
3) Voltage.
4) Ampacity.
b. Complete bill of material.
c. Manufacturer’s operating and maintenance instructions starter and/or contactor component parts, including:
1) Protective devices (fuses, breakers, overload relays, heater elements, etc.).
2) Pilot devices.
d. Complete renewal parts list.
e. As-built drawings:
1) Furnish as-built drawings for each starter and contactor indicating final:
a) Wire numbers.
b) Interfaces with other equipment.
2) 11-inch by 17-inch format.

1.05 QUALITY ASSURANCE
A. Regulatory requirements:

1. All starters and components shall be UL listed and labeled:
a. UL 508 - Industrial Control Equipment.
b. UL 508A - Industrial Control Panels.

2. NEMA ICS 2 - Industrial Control and System Controllers; Contactors and Overload Relays Rated: 600 Volts.

3. Combination starters shall be UL listed and labeled.

1.06 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.08 ADMINISTRATIVE REQUIREMENTS (NOT USED)

1.09 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.10 MAINTENANCE
A. Spare parts:

1. Provide the following spare parts, suitably packaged and labeled with the corresponding equipment number:
a. 1 spare fuse of each size and type per starter.

Page 2348 of 3073 ends

Motor Starters
16422-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) PART 2 PRODUCTS

2.01 GENERAL
A. Starters for motor control centers, individual enclosed starters, or control panels.

2.02 DESIGN AND PERFORMANCE CRITERIA
A. Provide equipment and components that are fully rated for the site elevation and operating environment where the equipment will be installed as specified in Section 01850 - Design Criteria and as indicated on the Drawings.

2.03 MANUFACTURERS
A. One of the following or equal:

1. NEMA starters and contactors:
a. ABB.
b. Allen-Bradley.
c. Eaton.
d. Schneider Electric.

2. Manual motor starters:
a. ABB.
b. Cutler-Hammer.
c. Schneider Electric.

3. Reduced voltage solid state starters:
a. Eaton (Westinghouse Series 2100).

2.04 MATERIALS (NOT USED)

2.05 MANUFACTURED UNITS
A. General:

1. Provide combination type starters with motor circuit protector or thermal-magnetic circuit breaker and control power transformer with ratings as indicated on the Drawings.

2. NEMA size, design, and rated:
a. NEMA Size 1 minimum.

3. Coordinate motor circuit protector, thermal magnetic circuit breaker, or fusible disconnect, and overload trip ratings with nameplate horsepower and current ratings of the installed motor:
a. If motors provided are different in horsepower rating than those specified or indicated on the Drawings, provide starters coordinated to the actual motors furnished.

4. Provide starters NEMA Size 2 and larger with arc quenchers on load breaking contacts.

5. Mount extended overload reset buttons to be accessible for operation without opening starter enclosure door.

B. Full voltage starters:

1. Across-the-line full voltage magnetic starters.

2. Rated for 600 volts.

Page 2349 of 3073 ends

Motor Starters
16422-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal)

3. Electrical characteristics as indicated on the Drawings.

4. Provide positive, quick-make, quick-break mechanisms, pad lockable enclosure doors.

5. Furnish starter with bi-metallic overload relays.

6. Double-break silver alloy contacts.

7. Remote indicators:
a. Provide Form C dry contacts for remote indication of:
1) Internal fault error.
2) Undervoltage.
3) Overvoltage.
4) Phase reversal.
5) Phase loss.
6) Overload.
7) Frequency out of range.
8) Excessive starts per hour.
9) Drive electronics over temperature.
10) Stall.
11) Jam.
12) System failure.
13) Starter failure.
14) Run status.
15) Full speed.

C. Manual motor starters:

1. General:
a. Provide with number of poles as indicated on the Drawings or as required by the connected load.
b. Provide handles that clearly indicate the On and Off (with lockout), positions.
c. Switch shall have positive, quick-make, quick-break mechanisms.

2. Thermal overload switches:
a. Provide thermal overloads in manual motor starters where integral overloads are not furnished with the motor.
b. Size heater elements for approximately 115 percent of the nameplate full load current, for motors with a 1.15 service factor.
c. Thermal overload units in all phase legs.
d. Overload conditions interrupts all ungrounded conductors.

3. Enclosure:
a. Provide the NEMA enclosure type specified in Section 16050 - Common Work Results for Electrical for the starter location.

D. RVSS:

1. Manufactured and tested in accordance with the applicable requirements of IEEE, UL, and NEMA, including the following:
a. Dielectric withstand per UL 508.
b. Noise and RF immunity per NEMA ICS-2.

2. Furnish with a motor circuit protector or thermal magnetic circuit breaker as indicated on the Drawings.

3. Provide protection against internal faults and high SCR temperature during operation of the motor including starting, running (except when bypassed), and stopping modes.

Page 2350 of 3073 ends

Motor Starters
16422-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal)

4. Capable of continuously delivering full rated current of the motor plus the motor service factor in ambient temperatures from 0 degrees Celsius to 40 degrees Celsius at the installed altitude.

5. Provide a magnetically operated bypass contactor in parallel with the solid state starter:
a. The bypass contactor to energize when the motor has reached full speed:
1) The electronic overload protection circuits must be fully functional with the bypass contactor closed.

6. RVSS control module requirements:
a. Microcomputer based, and contains the required circuitry to drive the power semiconductors in the power section of the starter. b. Integrally mounted on the power section and requires no additional panel space or wiring.
c. Mounted for easy wiring, testing, service, and replacement. d. Provide 3-phase current sensing.
e. Quick disconnect plug-in connectors for current transformer inputs, line and load voltage inputs, and SCR gate firing output circuits. f. Operates on power supplied from a control power transformer. g. Phase insensitive or with phase rotation protection. h. Control modes:
1) Soft start with adjustable linear ramp time and a “kick start” or “boost” feature to provide a short time (typically 0.1 seconds) application of approximately full voltage.
2) Soft start with adjustable linear ramp time, with a current limit:
a) The current limit shall be adjustable over the range of 2 to 4 times normal full load current.
3) Reverse voltage ramp (line voltage to zero voltage):
a) Adjustable from 2 to 30 seconds to provide smooth stop. b) Automatic shutdown at end of voltage ramp.
i. Protective functions:
1) Single phase protection.
2) Under voltage protection.
3) Short circuit electronic trip overcurrent protection. Time not to exceed 3 cycles.
4) Inverse time running overcurrent protection.
5) Auxiliary trip circuitry.
6) Gate firing circuit lockout protection on trip.
7) Jam and stall detection.
8) Fault relay lockout protection.
9) 100 percent to 130 percent full load running current trip adjustment. 10) 100 percent to 450 percent of starting current limit adjustment. 11) Dwell time at current limit with ramp continuation after acceleration. 12) Individual light emitting diodes (LEDs) for trip and phase loss. 13) Minimum and maximum initial starting voltage adjustments. 14) Initial torque adjustment.

7. RVSS power section requirements:
a. 3 sets of back-to-back phase-controlled power semiconductors:
1) Minimum repetitive peak inverse voltage of 1,500 volts at 480 VAC. 2) Resistor/capacitor snubber networks to prevent false firing of the SCRs.

Page 2351 of 3073 ends

Motor Starters
16422-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) 3) Equipped with individual heat sink assemblies.
4) Provide high-speed fuses for protection of the SCR stacks against short circuit conditions.
b. Provide metal oxide varistors for surge protection on the line and load side power terminal connections:
1) Rated for a minimum of 120 joules.
c. Capable of supplying the following current levels:
1) 600 percent of full load current for a minimum of 10 seconds. 2) 450 percent of full load for a minimum of 30 seconds. d. Furnish ground lugs, one for incoming and one for outgoing ground connections.
e. Furnish pressure type terminals for top or bottom entry power terminations.

8. Remote indicators:
a. Provide Form C dry contacts for remote indication of:
1) Internal fault error.
2) Undervoltage.
3) Overvoltage.
4) Phase reversal.
5) Phase loss.
6) Overload.
7) Frequency out of range.
8) Excessive starts per hour.
9) Drive electronics over temperature.
10) Stall.
11) Jam.
12) System failure.
13) Starter failure.
14) Run status.
15) Full speed.

2.06 EQUIPMENT (NOT USED)

2.07 COMPONENTS
A. Molded case circuit breakers:

1. Circuit breaker type and ratings as indicated on the Drawings.

2. Provide as specified in Section 16412 - Low Voltage Molded Case Circuit Breakers.

B. Contactors:

1. NEMA size as indicated on the Drawings.

2. Electrically held:
a. For lighting loads designed to withstand the initial inrush currents of ballast and lamp loads.

3. Factory adjusted and chatter free.

4. Auxiliary contacts:
a. Contact ratings as per NEMA A 600 rating:
1) Auxiliary contacts rated 10 amps at 600 volts.

Page 2352 of 3073 ends

Motor Starters
16422-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) b. Provide all contacts indicated on the Drawings, and any additional contacts required for proper operation.
c. Provide at least 1 normally open and 1 normally closed spare auxiliary contact.

5. Constructed in accordance with the following standards:
a. UL 508.
b. IEC 947-4:
1) Type 1 coordination when protected by a circuit breaker. 2) Type 2 coordination when protected by a suitable UL listed fuse. c. IEC 801-1 parts 2 through 6.

C. Overloads:

1. Bi-metallic overload relay:
a. Class 20 protection.
b. Ambient compensated.
c. Interchangeable heater pack:
1) 1 heater per phase.
2) Coordinate with installed motor full load amps and service factor. d. Visible trip indicator.
e. Push-to-trip test.
f. Isolated normally open alarm contact.
g. Normally closed trip contacts.
h. Manual reset.

D. Control power transformer:

1. Furnish integral control power transformer capacity to power:
a. All motor controls: Motor and starter accessories indicated on the Drawings or specified.

2. Primary and secondary fusing as indicated on the Drawings:
a. Fusing sized by the manufacturer for the rating of the transformer furnished.

3. Control power transformer secondary voltage:
a. As indicated on the Drawings.

2.08 ACCESSORIES
A. Lugs and terminals:

1. For all external connections of No. 6 AWG and larger.

2. UL listed for either copper or aluminum conductors.

B. Surge protective devices:

1. Furnish surge protection devices across the coil of each starter, contactor, and relay.

C. Pilot devices:

1. Provide pilot lights, switches, elapsed time meters, and other devices as specified or as indicated on the Drawings.

2. As specified in Section 17710 - Control Systems: Panels, Enclosures, and Panel Components.

Page 2353 of 3073 ends

Motor Starters
16422-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) D. Nameplates and wire markers:

1. As specified in Section 16075 - Identification for Electrical Systems.

E. Conformal coating:

1. Provide conformal coating material applied to electronic circuitry and printed circuit boards to act as protection against moisture, dust, temperature extremes, and chemicals such as H2S and chlorine.

2.09 FABRICATION (NOT USED)

2.10 FINISHES (NOT USED)

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION
A. Anchoring and bracing to structures:

1. Prepare equipment anchor setting template(s) and use to position anchors during construction of supporting structure(s).

2. Install anchors of type and material indicated on approved anchoring designs.

3. Install anchors with embedment indicated on approved anchoring designs.

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details.

B. Starters in motor control centers:

1. Install as specified in Section 16444 - Low Voltage Motor Control Centers.

C. Starters in control panels:

1. Install as specified in Section 17710 - Control Systems: Panels, Enclosures, and Panel Components.

D. Manual motor starters:

1. Provide complete mounting brackets and hardware as necessary for complete support of manual motor starter at locations indicated on the Drawings.

2. Mount manual motor starter rigidly to exposed building or equipment structural members.

3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

B. Source Testing (NOT USED).

Page 2354 of 3073 ends

Motor Starters
16422-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16422 (BidSetFinal) C. Owner Training:

1. Perform Owner training as specified in Section 01756 - Commissioning.

2. Topics:
a. Operation topics limited to:
1) Soft Starter Operation and Control
b. Maintenance topics limited to:
1) Soft Starter Operation and Control

3. Number of sessions:
a. Operations 1.
b. Maintenance 1.

3.05 FIELD QUALITY CONTROL

3.06 ADJUSTING
A. Make all adjustments as necessary and recommended by the manufacturer, Engineer, or testing firm.

B. Set all overloads and motor circuit protectors based on the nameplate values of the installed motor.

END OF SECTION

Page 2355 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal) SECTION 16441

GROUP-MOUNTED CIRCUIT BREAKER SWITCHBOARDS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Free standing, dead-front type metal-enclosed distribution, low voltage switchboards, utilizing group mounted circuit protective devices.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. National Electrical Manufacturers' Association (NEMA):

1. PB-2 - Dead-front Distribution Switchboards.

C. Underwriters' Laboratories, Inc. (UL):

1. 50 - Standard for Enclosures for Electrical Equipment.

2. 891 - Switchboards.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

1.04 SYSTEM DESCRIPTION
A. Factory assembled, wired, and tested switchboards, with major components being products of a single manufacturer, including but not limited to, circuit breakers, bus and enclosure with accessories and features specified in this Section and indicated on the Drawings.

B. Description of sections:

1. Space for future devices:
a. Where indicated on the Drawings, space for future devices shall include:
1) All necessary bus.
2) Device supports.
3) Device mounting equipment.
4) Device connections to bus work.
5) Wire troughs or raceway space.
6) Unused device space shall be covered with blank code gauge steel covers or doors.

Page 2356 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal)

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Manufacturer of switchboard.

2. Manufacturer of all component parts of switchboard.

3. Weight of switchboard.

4. Dimensions:
a. Height.
b. Length.
c. Width.

5. Nameplate schedule.

6. Bill of material.

7. Ratings:
a. Voltage.
b. Phase.
c. Current.
d. Interrupting rating (circuit breakers and fuses).
e. Momentary current rating.

8. List of recommended spare parts.

9. Name and telephone number of manufacturer’s authorized parts and repair provider.

10. Furnish circuit breaker submittals as specified in:
a. Section 16412 - Low Voltage Molded Case Circuit Breakers.

11. For equipment installed in structures designated as seismic design category C, D, E, or F submit the following as specified in Section 01850 - Design Criteria:
a. Manufacturer’s statement of seismic qualification with substantiating test data.
b. Manufacturer’s special seismic certification with substantiating test data.

C. Shop drawings:

1. Layout drawings:
a. Complete, detailed, and scaled switchboard layout:
1) Front panel.
2) Sub-panels.
3) Interior panels.
4) Top and bottom conduit windows.

D. Installation instructions:

1. Detail the complete installation of the equipment including rigging, moving, and setting into place.

2. For equipment installed in structures designated as seismic design category A or B:
a. Provide manufacturer’s installation instructions and anchoring details for connecting equipment to supports and structures.

3. For equipment installed in structures designated as seismic design category C, D, E, or F:
a. Provide project-specific installation instructions and anchoring details based on support conditions and requirements to resist seismic and wind loads as specified in Section 01850 - Design Criteria.

Page 2357 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal) b. Submit anchoring drawings with supporting calculations. c. Drawings and calculations shall be stamped by a professional engineer registered in the state where the Project is being constructed.

E. Operating and maintenance manuals:

1. Submit operating instructions and a maintenance manual for the switchboard(s) furnished and/or installed under this Contract.

2. Operating instructions:

3. Maintenance manual:
a. Furnish maintenance manuals with instructions covering all details pertaining to care and maintenance of all equipment as well as data identifying all parts.
b. Manuals to include but are not limited to the following:
1) Adjustment and test instructions covering the steps involved in the initial test, adjustment, and start-up procedures.

F. Test forms and reports:

1. Submit complete factory acceptance test procedures and all forms used during the test.

2. Manufacturer to furnish a certified report after the shop tests.

3. Manufacturer to furnish a certified report after the start-up:
a. Report must state that the installation is complete and satisfactory, or list items requiring additional work and a proposal for the corrective actions.

G. Certification letters:

1. Provide a letter from the switchboard manufacturer that lists every paragraph, subparagraph etc. of this Section and states compliance or non-compliance with said paragraph. If non-compliance is indicated, provide an explanation for the deviation and alternative method to address the non-compliance.

H. Calculations:

1. Detailed calculations or details of the actual physical testing performed on the switchboard to prove the switchboard is suitable for the seismic requirements at the Project Site.

1.06 QUALITY ASSURANCE
A. Sections and devices shall be UL listed and labeled.

B. The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of 5 years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement.

1.07 DELIVERY STORAGE AND HANDLING
A. Ship the switchboard to the job site on a dedicated air ride vehicle that will allow the Contractor to utilize onsite off-loading equipment:

B. Furnish temporary equipment heaters within the switchboard to prevent condensation from forming.

Page 2358 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING
A. Conduct the initial fault current study as specified in Section 16305 - Electrical System Studies and submit results for Engineer’s review.

B. After successful review of the initial fault current study, submit complete equipment submittal.

C. Conduct factory acceptance test and submit certified test results for Engineer’s review.

D. Ship equipment to Project Site after successful completion of factory acceptance test.

E. Assemble equipment in the field.

F. Conduct field acceptance test and submit results for Engineer’s review.

G. Submit manufacturer’s certification that equipment has been properly installed and is fully functional for Engineer’s review.

H. Conduct Owner’s training sessions.

I. Commissioning as specified in Section 01756 - Commissioning.

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. The following, no equal, to match owner standard:

1. GE by ABB.

B. Circuit breakers: Same manufacturer as the switchboard.

Page 2359 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal)

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. Switchboard:

1. Furnish low voltage Class 2 switchboards as specified and indicated on the Drawings.

2. Provide complete and functional switchboards with required controls.

3. Furnish and install devices or accessories not described in this Section but necessary for the proper installation and operation of the equipment.

B. Voltage ratings:

1. Voltage level and configuration: As indicated on the Drawings.

2. Frequency: 60 hertz.

C. Bus:

1. General:
a. Tin-plated copper.
b. Bus cross-section in accordance with UL heat rise requirements. c. Current density of 1,000 amperes per square inch.
d. Mounted on supports of high-impact, non-tracking insulators. e. Phase A-B-C bus arrangement:
1) Top-to-bottom, left-to-right, front-to-back throughout the switchboard. f. Symmetrical short circuit current bracing of as indicated on the Drawings. g. Continuous current rating as indicated on the Drawings.

2. Horizontal bus:
a. Provisions for future connections to additional switchboard sections.

3. Ground bus:
a. Sized per UL 891.

D. Enclosure:

1. General:
a. Self-supporting structures bolted together to form the required line-up. b. All sections rear aligned.
c. Dead-front.
d. Conduit entry:
1) Open-bottom.
2) Removable top cover.

2. Frame:
a. Die-formed 12 gauge steel.

3. Covers:
a. Bolt-on.
b. Code gauge steel.
c. Removable front covers.
1) Held in place by captive screws.

4. Rating:
a. NEMA Type 1.

Page 2360 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal)

2.06 COMPONENTS
A. Circuit breakers:

1. General:
a. Molded case circuit breakers as specified in Section 16412 - Low Voltage Molded Case Circuit Breakers.

2. Main circuit breaker:
a. Frame, trip and short circuit ratings as indicated on the Drawings. b. 100 percent rated.

3. Feeder breakers:
a. Frame, trip and short circuit ratings as indicated on the Drawings.

B. Wiring:

1. Provide all necessary internal wiring, fuse blocks, and terminal blocks as required.

2. Number all wires at each end and indicate wire numbers on shop drawings.

3. Type SIS switchboard wire with at least 26 strands.

4. Minimum wire size:
a. No. 14 for control circuits.
b. No. 12 for potential and current transformer circuits.

5. Numbered and labeled in accordance with Section 16075 - Identification for Electrical Systems.

2.07 ACCESSORIES
A. Metering system:

1. Include metering as indicated on the Drawings.

2. Provide microprocessor based power meters as specified in Section 16290 - Electrical Power Monitoring.

B. Surge protective devices:

1. Provide surge protective devices as indicated on the Drawings and as specified in Section 16285 - Surge Protective Devices.

C. Nameplates:

1. Provide engraved plastic nameplates to identify:
a. Switchboard units.
b. Door mounted components.
c. Interior mounted devices.

2. As specified in Section 16075 - Identification for Electrical Systems.

3. Engraved with the circuit number and circuit name as indicated on the Drawings.

4. Manufacturers labels:
a. Each vertical section shall have a label identifying:
1) Serial number.
2) Shop order number.
3) Bus rating.
4) Vertical section reference number.
5) Date of manufacture.

Page 2361 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal) D. Warning signs:

1. Voltage:
a. Provide a minimum of 2 warning signs on the front of the switchboard lineup and 2 on the back.
b. Red laminated plastic engraved with white letters approximately 1/2 inch high.
c. Signs shall read:
1) "WARNING-HIGH VOLTAGE-KEEP OUT".

2. Arc flash:
a. Provide one warning sign for each switchboard compartment. b. Signs shall have read a minimum of:
1) “DANGER ELECTRIC ARC FLASH HAZARD.”
2) Signs shall meet the requirements of NFPA 70E and NEC Article 110.16.

E. Lugs:

1. For all external connections of No. 6 AWG or larger.

2. UL listed for copper or aluminum conductors.

3. Rated for 75-degree Celsius conductors.

4. Lugs shall be of the compression type in design requiring a hydraulic press and die for installation.

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES
A. Chemically clean all steel surfaces before painting.

B. Exterior color manufacturer’s standard gray over phosphate-type rust inhibitor.

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.

Page 2362 of 3073 ends

Group-Mounted Circuit Breaker Switchboards
16441-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16441 (BidSetFinal) B. General:

1. Furnish all cables, conduit, lugs, bolts, expansion anchors, sealants, and other accessories needed to complete the installation of the switchboard.

2. Assemble and install the switchboard in the location and layout indicated on the Drawings.

3. Perform work in accordance with manufacturer’s instructions and shop drawings.

4. Furnish components and equipment as required to complete the installation.

5. Replace any hardware lost or damaged during the installation or handling to provide a complete installation.

6. Install the switchboard on a raised concrete housekeeping pad:
a. Provide structural leveling channels in accordance with the manufacturer’s recommendations to provide proper alignment of the units. b. Weld and/or bolt the switchboard frame to be to the leveling channels.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 REINSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

B. Factory tests:

1. Owner and Engineer will witness the factory acceptance test as specified in Section 16050 - Common Work Results for Electrical.

2. Completely assemble, wire, and test the switchboard:
a. Provide groups of wires leaving the shipping-assembled equipment with terminal blocks with suitable numbering strips.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 16050 - Common Work Results for Electrical.

3.09 ADJUSTING
A. Make all adjustments as necessary and recommended by the manufacturer, Engineer, or testing firm.

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2363 of 3073 ends

Panelboards
16445-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal) SECTION 16445

PANELBOARDS
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Panelboards serving feeder circuits and branch circuits.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Underwriter's Laboratories, Inc. (UL):

1. 67 - Standard for Panelboards.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

1.04 SYSTEM DESCRIPTION
A. Circuit breaker panelboards as indicated in the panelboard schedules, one-lines, and where indicated on the Drawings:

1. Service voltage and configuration as indicated on the panel schedules.

1.05 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. Manufacturer of panelboard.

2. Bill of material.

3. Assembly ratings including:
a. Voltage.
b. Phase.
c. Continuous current.
d. Short circuit interrupting rating.

4. NEMA enclosure type.

5. Cable terminal sizes based upon actual feeder and sub-feeder conductors used.

6. Furnish circuit breaker submittals as specified in Section 16412 - Low Voltage Molded Case Circuit Breakers.

7. For equipment installed in structures designated as seismic design category C, D, E, or F submit the following as specified in Section 01850 - Design Criteria:
a. Manufacturer’s statement of seismic qualification with substantiating test data.
b. Manufacturer’s special seismic certification with substantiating test data.

Page 2364 of 3073 ends

Panelboards
16445-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal) C. Shop drawings:

1. Drawings to contain:
a. Overall panelboard dimensions, interior panel dimensions, and wiring gutter dimensions:
1) Height.
2) Length.
3) Width.
b. Weight.
c. Anchoring locations.
d. Breaker layout drawing with dimensions:
1) Location of the main, branches, solid neutral, and ground. e. Conduit entry/exit locations:
1) Identify all conduit entry/exit locations and restrictions. f. Individual panel schedules identifying breaker locations, ratings, and nameplate designations within the panelboard, for every panelboard.

D. Installation instructions:

1. Detail the complete installation of the equipment including rigging, moving, and setting into place.

2. For equipment installed in structures designated as seismic design category A or B:
a. Provide manufacturer’s installation instructions and anchoring details for connecting equipment to supports and structures.

3. For equipment installed in structures designated as seismic design category C, D, E, or F:
a. Provide project-specific installation instructions and anchoring details based on support conditions and requirements to resist seismic and wind loads as specified in Section 01850 - Design Criteria.
b. Submit anchoring drawings with supporting calculations. c. Drawings and calculations shall be stamped by a professional engineer registered in the state where the Project is being constructed.

E. Operations and maintenance manual:

1. Provide a complete manual for the operation and maintenance of the panelboard, circuit breakers, devices, and accessories:
a. Including but not limited to:
1) Instruction narratives and bulletins.
2) Renewal parts lists.
3) Time-current curves for all devices.

F. Calculations:

1. Detailed calculations or details of the actual physical testing performed on the panelboard to prove the panelboard is suitable for the seismic requirements at the Project Site.

1.06 QUALITY ASSURANCE
A. Panelboards shall be UL listed and labeled.

1. Where indicated as service entrance equipment, panelboards shall be UL labeled and listed “Suitable for Service Entrance.”

Page 2365 of 3073 ends

Panelboards
16445-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal)

1.07 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING (NOT USED)

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

1.13 OWNER’S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS

2.01 MANUFACTURERS
A. One of the following or equal:

1. Eaton.

2. GE by ABB.

3. Schneider Electric.

B. Circuit breakers:

1. Same manufacturer as the panelboard.

2.02 EXISTING PRODUCTS (NOT USED)

2.03 MATERIALS (NOT USED)

2.04 MANUFACTURED UNITS (NOT USED)

2.05 EQUIPMENT
A. Provide panelboards with:

1. Molded-case circuit breakers with trip ratings as shown on the panel schedules.

2. Spares and spaces for future circuit breakers in panels as shown on the panel schedules.

Page 2366 of 3073 ends

Panelboards
16445-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal) B. Short circuit rating:

1. Provide panelboards with short-circuit ratings as indicated on the Drawings:

2. Testing method in accordance with UL 67.

3. Mark each panelboard with its maximum short circuit rating at the supply voltage.

4. Panelboards shall be fully rated.

2.06 COMPONENTS
A. Enclosure:

1. NEMA enclosure type as indicated on the Drawings.
a. Where not indicated on the Drawings, as specified in Section 16050 - Common Work Results for Electrical for the installed location.

2. Minimum width: 20 inches.

3. Gutter space in accordance with the NEC:
a. Minimum of 4 inches of gutter space.

4. Dead-front, no live parts when the panelboard is in service.

5. Enclose entire panelboard bus assembly in a corrosion resistant galvanized steel cabinet.

6. 4-piece front to provide ease of wiring access.

7. Lockable, hinged door over the protective devices with a flush, cylinder tumbler-type lock with catch and door pull.
a. Minimum 2 keys per panelboard.
b. Key all panelboard locks alike.
1) Match locks on existing panelboards to the extent possible.

8. Circuit directory frame and card on the inside of the door.

9. Door-in-door construction consists of a one-piece front with 2 doors:
a. The smaller door provides access to all device handles and rating labels and shall be lockable.
b. The larger door provides access to all conductors and wiring terminals.

10. Interior design such that replacement of circuit breakers does not require disturbing adjacent units or removal of the main bus connectors.

11. Outdoor locations: Provide NEMA Type 4X enclosures with a NEMA Type 4X stainless steel outer enclosure (with a hinged door) and a NEMA Type 1 interior panelboard, unless otherwise indicated.

B. Bus:

1. General:
a. Tin-plated copper.

2. Phase bus:
a. Full size and height without reduction.
b. Dimensions and temperature rise in accordance with UL 67:
1) Limit current density to less than 1,000 amps per square inch. c. Insulate all current carrying parts from ground and phase-to-phase with a high dielectric strength insulator.

3. Ground bus:
a. Copper, solidly bonded.

Page 2367 of 3073 ends

Panelboards
16445-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal)

4. Neutral bus:
a. Provide where indicated on the Drawings.
b. 100 percent rated.
c. Provide lugs for each outgoing feeder requiring a neutral connection.

5. Provide insulation barriers over the vertical bus behind the dead front shield to provide increased safety during field service.

C. Lugs:

1. UL listed for copper and aluminum wire:
a. Provide lugs rated for 75-degree Celsius terminations. b. Provide bolted or compression main lug terminations as required for the incoming cable size.

D. Circuit breakers: As specified in Section 16412 - Low Voltage Molded Case Circuit Breakers and as indicated on the Drawings:

1. Provide all circuit breakers with bolt-on connections:
a. Plug-in circuit breakers are not allowed.

2.07 ACCESSORIES
A. Surge protective devices:

1. Furnish panelboards with surge protective devices as indicated on the Drawings.

2. As specified in Section 16285 - Surge Protective Devices.

B. Nameplates:

1. As specified in Section 16075 - Identification for Electrical Systems.

2. Install on outside of door.

3. Indicating:
a. Panel designation.
b. Voltage.
c. Number of phases and configuration.

C. Circuit identification labels:

1. Provide index cards behind heavy clear plastic in cardholders on the inside of the doors.

2. Type all information on the cards using designations in the panel schedules.

3. Laminated on both sides.

D. Pad locking mechanism:

1. Provide a pad locking attachment to allow circuit breakers to be locked in the off position.

2. At a minimum, provide 1 mechanism per panelboard:
a. Provide multiple mechanisms if required to accommodate all circuit breaker frame sizes in the panelboard.

Page 2368 of 3073 ends

Panelboards
16445-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal)

2.08 MIXES (NOT USED)

2.09 FABRICATION (NOT USED)

2.10 FINISHES
A. Finish stand-alone panelboards with a primer, rust-resistant phosphate undercoat, and 2 coats of oven-baked enamel with manufacturer’s standard gray.

B. Finish panelboards mounted in motor control centers to match the motor control center finish and color.

2.11 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install the equipment in accordance with the accepted installation instructions and anchorage details to meet the seismic and wind load requirements at the Project site.

B. General:

1. Mounted as indicated on the Drawings.

2. Mount rigidly to structural members with exposed surfaces plumb and level to within 1/32 inch.

3. Perform work in accordance with the manufacturer’s instructions and shop drawings.

4. Provide all brackets, hangers, supports, and hardware for mounting as required.

5. In all NEMA Type 4 and NEMA Type 4X locations, mount panelboards on 7/8-inch deep stainless steel preformed channel, with channel running vertically from top to bottom of panelboard:
a. Use only stainless steel mounting hardware.

6. Mount panelboard so that top operating handle is not more than 6 feet-7 inches above the operating floor.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

Page 2369 of 3073 ends

Panelboards
16445-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16445 (BidSetFinal)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

B. Factory testing:

1. Perform standard factory tests on the panelboards:

2. Test in accordance with the latest version of NEMA and UL standards.

3.08 FIELD QUALITY CONTROL
A. As specified in Section 16050 - Common Work Results for Electrical.

3.09 ADJUSTING (NOT USED)

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES
A. Circuiting within the panelboard shall match the panel schedules as indicated on the Drawings.

B. Provide typewritten schedule in each panelboard.

END OF SECTION

Page 2370 of 3073 ends
Page 2371 of 3073 ends

Low Voltage Fuses
16494-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (BidSetFinal) SECTION 16494

LOW VOLTAGE FUSES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Fuses: 600-volt class and lower.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

1.03 DELEGATED DESIGN (NOT USED)

1.04 SUBMITTALS
A. Furnish submittals as specified in Sections 01330 - Submittal Procedures.

B. Product data:

1. Catalog cut sheets.

2. Complete fuse schedule.

3. Manufacturer original 11-inch by 17-inch, time current curves for all fuses furnished.

C. Shop drawings:

1. Include drawings of spare fuse cabinets.

1.05 QUALITY ASSURANCE
A. All low voltage fuses shall be UL listed and labeled.

1.06 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.08 ADMINISTRATIVE REQUIREMENTS (NOT USED)

1.09 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

Page 2372 of 3073 ends

Low Voltage Fuses
16494-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (BidSetFinal)

1.10 MAINTENANCE
A. Spare parts:

1. Provide 3 spare fuses for each size and type used or supplied under any Section of the Contract Documents.

2. Provide spare fuse cabinet(s):
a. Metal cabinet with hinged door and shelves or fuse holders. b. Gray enamel finish.
c. Mount near equipment and label "Spare Fuses" on face of cabinet. d. Suitable pocket inside door of each cabinet with typewritten spare fuse inventory in clear plastic protective insert.
e. Provide as many cabinets as required to hold entire spare fuse inventory.

PART 2 PRODUCTS

2.01 GENERAL
A. Fuses for overcurrent protection and/or current limiting applications as indicated on the Drawings.

2.02 DESIGN AND PERFORMANCE CRITERIA (NOT USED)

2.03 MANUFACTURERS
A. One of the following or equal:

1. Bussmann.

2. Ferraz Shawmut.

3. Littelfuse.

2.04 MATERIALS (NOT USED)

2.05 MANUFACTURED UNITS
A. General:

1. Provide durable, readily visible label inside each fuse enclosure, clearly indicating the correct type, size, and ratings of replacement fuse:
a. Label shall not cover or interfere with equipment manufacturer's instructions.

2. Affix a label indicating recommended torque for fuse mounting bolts or studs to the inside of fuse access doors.

3. To ensure selective coordination of protective devices:
a. Provide fuses for new facilities by the same manufacturer. b. Provide fuses for renovations of the same manufacturer as existing fuses.

4. Provide fuses rated for the voltage and available short circuit current at which they are applied.

Page 2373 of 3073 ends

Low Voltage Fuses
16494-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (BidSetFinal) B. Fuses for services, switchboard mains, feeders, and branch circuits:

1. 600 amperes and less:
a. Provide UL listed RK1 dual-element, time-delay fuses with ampere ratings as indicated on the Drawings except as may be modified by the Contract Documents.

2. 601 to 6,000 amperes:
a. Provide UL listed Class L fuses.

C. Fuses for motor branch circuits:

1. Ampere ratings shall not exceed motor controller manufacturer’s recommended values:
a. If manufacturer does not have such standards, provide fuses as specified in this Section.

2. Provide Class RK1 fuses or fuses as indicated on the Drawings and as specified in the Contract Documents, rated in accordance with the fuse manufacturer’s recommendations for backup running protection of motor circuits containing overload relays.

3. Determine fuse ratings for overload protection of motor branch circuits by actual full-load currents of motors provided.

4. Fuses in motor control centers may be time-delay Class J or Class CC fuses, if MCC manufacturer’s standard designs use these fuse types:
a. Time-delay Class J fuse ratings shall not exceed 150 percent of motor full load current except as permitted.
b. Follow fuse manufacturer’s recommendations for Class CC fuses. c. A motor having starting duty or other special characteristics requiring larger fuses than specified above, may have branch circuit fuse ratings increased as necessary to meet motor’s requirements, but no larger than maximum permitted by the NEC.
1) Increased requirements for an individual motor shall not be cause for increasing size of all fuses.

5. Provide Class L fuses for motor branch circuits requiring fuses over 600 amperes, sized at 150 percent of motor full load current except as permitted below:
a. A motor having starting duty or other special characteristics requiring larger fuses than specified above, may have branch circuit fuse ratings increased as necessary to meet motor’s requirements, but no larger than maximum permitted by the NEC.
1) Increased requirements for an individual motor shall not be cause for increasing size of all fuses.

D. Fusing of control circuits:

1. Provide:
a. RK1 fuses installed in UL listed Class CC fuse blocks as specified in the Contract Documents.

2. Provide minimum protection for control circuits in accordance with the latest revision of UL Standard 508 for Industrial Control.

3. Fuse both the primary and secondary circuit of control power transformers:
a. Fuse ratings shall be in accordance with NEC requirements.

Page 2374 of 3073 ends

Low Voltage Fuses
16494-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16494 (BidSetFinal) PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. General:

1. Install fuses properly aligned, electrically and mechanically secure.

2. Evenly torque mounting bolts and nuts to ASTM recommendations for type and diameter of mounting bolts or studs provided.

3. Paralleling of fuses is not permitted.

4. Install fuses so that the fuse nameplate and rating are easily readable in the equipment.

B. Replace fuses, on all phases, for any fuses that opened during start-up and testing.

C. After completion of testing, deliver spare fuses in quantities specified:

1. Fuses shall be new, in manufacturer's original packaging, and stored in a clean, dry location.

D. Install spare fuse cabinets where instructed by the Owner.

3.04 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

END OF SECTION

Page 2375 of 3073 ends

Lighting: LED Luminaires
16510-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal) SECTION 16510
LIGHTING: LED LUMINAIRES
PART 1 GENERAL

1.01 SUMMARY
A. Section includes: LED luminaires, drivers, poles, and accessories.

1.02 REFERENCES
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Illuminating Engineering Society (IES):

1. LM-79 - Approved Method: Optical and Electrical Measurements of Solid-State Lighting Products.

2. LM-80 - Measuring Luminous Flux and Color Maintenance of LED Packages, Arrays and Modules.

3. TM-21 - Projecting Long Term Lumen, Photon, and Radiant Flux Maintenance of LED Light Sources.

4. RP-7 - Recommended Practice for Lighting Industrial Facilities.

C. Institute of Electrical and Electronics Engineers (IEEE):

1. C62.41 - IEEE Recommended Practice for Surge Voltages in Low-Voltage AC Power Circuits.

D. National Electrical Manufacturers Association (NEMA):

1. 410 - Performance Testing for Lighting Controls and Switching Devices with Electronic Drivers and Discharge Ballasts.

E. Underwriters Laboratories (UL):

1. 1598 - Luminaires.

2. 8750 - Light Emitting Diode (LED) Equipment For Use In Lighting Products.

1.03 DEFINITIONS
A. As specified in Section 16050 - Common Work Results for Electrical.

B. Specific definitions and abbreviations:

1. CCT: Correlated color temperature - Scientific scale to describe how “warm” or how “cool” the light source is, measured in Kelvin. The lower the Kelvin temperature, the warmer the light feels, or appears.

2. CRI: Color Rendering Index - A quantitative measure of the ability of a light source to reveal the colors of various objects faithfully in comparison with an ideal or natural light source.

3. Driver - Device that manages power and controls the current flow from AC to DC for an LED lighting product.

Page 2376 of 3073 ends

Lighting: LED Luminaires
16510-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

4. Efficacy - Lumen output of a light source per unit of power supplied to that source (lumens per watt).

5. EMI: Electromagnetic Interference - Electrical interference (noise) generated by electrical and electronic devices.

6. FC: Foot Candles - Measure of light level on a surface being illuminated.

7. L70 - The extrapolated life in hours of the luminaire when the luminous output depreciates 30 percent from initial values.

8. LED: Light emitting diode - A solid-state semiconductor device that produces light when electrical current flows through it.

9. LED light source - See LED luminaire.

10. LED luminaire - A complete lighting unit consisting of LED-based light emitting elements and a matched driver together with parts to distribute light, to position and protect the light emitting elements, and to connect the unit to a branch circuit.

11. Lumen - The international (SI) unit of luminous flux or quantity of light. The amount of light that is spread over a square foot of surface by one candle power when all parts of the surface are exactly one foot from the light source.

12. Lumen ambient temperature multiplier - LED light source relative lumen output when compared to a standard ambient temperature.

13. Lumen maintenance factor - How well an LED light source is able to retain its intensity when compared to new.

14. Luminaire - Lighting unit.

15. THD: Total harmonic distortion - The combined effect of harmonic Distortion on the AC waveform produced by a driver or other device.

1.04 SUBMITTALS
A. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Product data:

1. LED Luminaires:
a. Catalog literature for each luminaire specified, cross-referenced to the luminaire type on the Luminaire Schedule in the Drawings. b. Provide for each luminaire type:
1) Materials.
2) Type of diffuser.
3) Hardware.
4) Gasketing.
5) Reflector.
6) Chassis.
7) Finish and color.
8) Driver type and protection.
9) LED luminaire:
a) Initial lumen output at 40 degrees Celsius ambient.
b) Correlated color temperature.
c) Lumen maintenance factors.
d) Lumen ambient temperature multipliers.
e) Drive current.
f) Efficacy.
10) Picture of luminaire.
11) IES optical distributions.

Page 2377 of 3073 ends

Lighting: LED Luminaires
16510-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal) 12) Dimensioned drawings:
a) Effective projected area rating for pole mounted luminaires. 13) Weight.
14) Photometric data:
a) Coefficient of utilization tables based on the IES zonal cavity system by an approved testing laboratory.
b) Luminaire dirt depreciation factor.
c) Candlepower distribution curves.
d) Average luminaire brightness.
e) Lumen output charts.
15) Furnish support method for interior luminaires weighing more than 30 pounds and all wall-mounted luminaires:
a) Support methods shall be based on seismic requirements at the project site as specified in Section 01850 - Design Criteria. c. Luminaire substitutions:
1) Provide complete literature for each luminaire substitution:
2) Submittals for substituted luminaires shall be sufficient for competent comparison of the proposed luminaire to the originally specified luminaire:
a) Photometric data:
(1) IES file in standard IES format.
(2) Coefficient of utilization tables based on the IES zonal cavity system by an approved testing laboratory.
(3) Candlepower distribution curves.
(4) Average luminaire brightness.
(5) Lumen output charts.
(6) Power requirements in watts and volt-amperes.
b) Calculations:
(1) Provide software generated calculations showing
illuminance levels in footcandles and power usage in watts per square foot for each of the areas in which substitutions are proposed:
(a) Use surface reflectance values in accordance with
IES RP-7.
(b) Use manufacturer Projected Lumen Maintenance
factor for minimum of 60,000 hours to perform all
calculations.
c) Specification sheets:
(1) If lacking sufficient detail to indicate compliance with contract documents, standard specification sheets will not be accepted. This includes, but is not limited to, luminaire type designation, manufacturer's complete catalog number, voltage, LED type, CCT, CRI, specific driver information, system efficacy, L70 life rating, and any modifications necessary to meet the requirements of the contract
documents.
3) Substitutions for specified luminaires will be evaluated upon quality of construction, light distribution, energy use, appearance, and maintenance.
4) Substitutions shall comply with all applicable building and energy codes.

Page 2378 of 3073 ends

Lighting: LED Luminaires
16510-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

2. Driver: Provide for each driver type:
a. Catalog number.
b. Type of driver.
c. Output wattage.
d. Input voltage.
e. Operating voltage range.
f. Maximum input power.
g. Efficiency.
h. Operating line current.
i. Power factor.
j. Operating temperature range.
k. Current output range in ambient temperatures of 30 to 55 degrees Celsius.
l. Surge suppression data.

3. Photocell:
a. Provide for each photocell type:
1) Switching capacity.
2) Life expectancy when used on LED sources.
3) The means of adjusting the lighting pickup level.
4) Enclosure type.
5) Mounting method.

4. Luminaire poles:
a. Submit complete data for each pole type including but not limited to:
1) Material.
2) Finish and color.
3) Handholes.
4) Anchoring.
5) Luminaire attachment methods and fittings.
6) Pole height.
7) Pole dimensions.
8) Bolt hole circle layout and hardware.
9) Accessories.
10) Provide the EPA wind load rating.

C. Calculations:

1. Provide complete design calculations and installation documents for pole mounting piers and poles mounted from structures:
a. Include in the calculations the wind and seismic requirements at the project site.
b. Calculations and design shall be performed by and signed by a Professional Engineer registered in the state where the project is being constructed:

D. Record documents:

1. Update the Luminaire Schedule in the Drawings to reflect the acceptable substitutions, after the substitution has been reviewed and accepted by the Engineer.

1.05 QUALITY ASSURANCE
A. Luminaires shall be UL listed and labeled.

Page 2379 of 3073 ends

Lighting: LED Luminaires
16510-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

1.06 DELIVERY, STORAGE, AND HANDLING (NOT USED)

1.07 PROJECT OR SITE CONDITIONS
A. As specified in Section 01850 - Design Criteria.

1.08 SEQUENCING (NOT USED)

1.09 SCHEDULING
A. Exterior and outdoor lighting system operation shall be demonstrated during the hours of darkness.

B. Lighting demonstration shall occur within 2 weeks before substantial completion.

1.10 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

B. LED luminaire:

1. 5-year warranty from the date of installation including material, workmanship, photometrics, driver, and LED modules.

1.11 SYSTEM START-UP

1.12 OWNER’S INSTRUCTIONS (NOT USED)

1.13 MAINTENANCE
A. Furnish 1 complete spare LED luminaire, with driver, of each type used.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Luminaires:

1. The following or equal:
a. As noted on the Luminaire Schedule.

B. Drivers:

1. One of the following or equal:
a. Philips Advance.
b. Thomas Research.
c. eldoLED.

C. Substitutions:

1. The lighting design and luminaire selection has been based upon the photometric data of the identified luminaire. It is the Contractor’s responsibility to ensure and prove to the Engineer at time of submittal the substitutions meet the quality and photometric requirements of the original design.

Page 2380 of 3073 ends

Lighting: LED Luminaires
16510-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

2.02 SYSTEM DESCRIPTION
A. Provide luminaires, and accessories for all lighting systems, complete and operable, in accordance with the requirements of the Contract Documents.

B. Individual luminaire types are indicated on the Drawings and on the Luminaire Schedule.

2.03 EXISTING PRODUCTS (NOT USED)

2.04 MATERIALS (NOT USED)

2.05 MANUFACTURED UNITS (NOT USED)

2.06 EQUIPMENT
A. LED Luminaires:

1. General:
a. Pre-wired with leads of 18-AWG, minimum, for connection to building circuits.
b. Provide the luminaires furnished per the Luminaire Schedule in the Drawings:
1) The Specifications noted in this Section are an addition or supplement to the Luminaire Schedule.
c. Individual LEDs connected such that a catastrophic loss or the failure of 1 LED will not result in the loss of the entire luminaire.

2. Minimum ambient temperature range of 0 degrees Celsius to 40 degrees Celsius.

3. Minimum rated life:
a. Process Areas: 100,000 hours when operated at 40 degrees Celsius.

4. Minimum efficacy of 70 lumens/watt.

5. Minimum Color Rendering Index of 70.

6. Tested according to IES LM-79 and LM-80.

7. Lumen maintenance projection in accordance with IES TM-21.

8. RoHS compliant.

9. Integral driver.

10. Suitable for dry, damp, or wet locations as indicated on the Drawings or on the Luminaire Schedule.
a. Wet or damp locations: UL 1598 listed.

11. Designed as a complete LED assembly. Retrofit LED lamps in luminaires not designed specifically for LED light sources shall not be used.

12. Exterior/outdoor luminaires:
a. Luminaires in combination with their mounting pole and bracket shall be capable of withstanding:
1) Wind levels at the project site without damage.
2) Seismic levels at the project site.
b. Corrosion-resistant hardware and hinged doors or lens retainer. c. Luminaires furnished with integral photoelectrical control shall be of the luminaire manufacturer's standard design.

Page 2381 of 3073 ends

Lighting: LED Luminaires
16510-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal) d. California Energy Code Light Pollution Reduction Compliance:
1) Provide all exterior luminaires with cutoff photometrics. a) Luminaire design shall allow no more than 0.01 horizontal footcandles to escape beyond the site boundary.
2) Provide exterior luminaires with photocells to automatically control exterior lighting dusk to dawn to turn off or lower the lighting levels during inactive periods. Reference the Drawings for specific luminaires to be controlled.

B. Photo-electric cells:

1. Photoelectric cell for control of a single luminaire:
a. Integral to the luminaire.

C. Drivers:

1. Dimmable, with dimming signal protocol of 0-10 VDC or DALI.

2. Input power source:
a. As indicated on the Drawings.

3. Drive current:
a. As indicated in the Luminaire Schedule.

4. Power factor: greater than 0.90.

5. Efficiency: greater than 80 percent.

6. Total harmonic distortion (THD) of the input current less than 20 percent.

7. Rated life of 60,000 hours in an LED luminaire operated at an ambient temperature of 40 degrees Celsius.

8. Minimum operating temperature of 0 degrees Celsius.

9. Sound rating: Class A+ or quieter.

10. UL listed Class 2 Outdoor in accordance with UL 8750.

11. In accordance with IEEE C62.41 Category A for transient protection.

12. Driver must limit inrush current:
a. Meet or exceed NEMA 410 driver inrush standard:
1) 230 Amps per 10 Amp load with a maximum of 106 Amps
squared-seconds at 120V.
2) 430 Amps per 10 Amp load with a maximum of 370 Amps
squared-seconds at 277V.

2.07 COMPONENTS
A. Luminaire poles:

1. As indicated on the Luminaire Schedule.

2. Anchor bolts:
a. Use anchor bolts, bolts, or welded studs for anchors for resisting seismic and wind forces.
1) Standard hex bolt head.
2) Do not use anchor bolts fabricated from rod stock with an L or J-shape.
b. Complete with leveling shims.

3. Anchor base:
a. Fabricated from the same type of material as the pole shaft. b. Base plate to telescope the pole shaft.
c. Welded top and bottom along the entire perimeter.
d. With slotted bolt holes on the bolt circles as submitted.

Page 2382 of 3073 ends

Lighting: LED Luminaires
16510-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

4. Pole shaft:
a. As indicated on the Luminaire Schedule.

5. Handhole:
a. Reinforced handhole located approximately 18 inches above the base. b. Complete with cover fabricated from the same material as the pole shaft and stainless steel attachment screws.
c. With an integral ground connection nut, 1/2 inch by 13 inch UNC welded to the pole for connection to the grounding system.

6. Shroud:
a. Fabricated from the same type of material as the pole shaft. b. 1-piece formed channel section that shall conform to the pole shaft taper. c. Secured by a locking device with provisions for a padlock to prevent accidental lowering.

7. Fastening hardware:
a. All fasteners shall be stainless steel.

8. Finish:
a. As indicated on the Luminaire Schedule.

2.08 ACCESSORIES
A. Pole mounted convenience outlet:

1. Where indicated, furnish a 120 Volt, GFCI protected receptacle:
a. Integrally mounted in the pole shaft at 24 inches above the base.

2. Complete with corrosion resistant and weatherproof cover.

2.09 MIXES (NOT USED)

2.10 FABRICATION (NOT USED)

2.11 FINISHES (NOT USED)

2.12 SOURCE QUALITY CONTROL (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION (NOT USED)

3.03 INSTALLATION
A. Install luminaires per the manufacturer’s guidelines and submitted installation calculations to meet seismic and wind requirements at the project site.

B. Special techniques:

1. Support luminaires from structural elements capable of carrying the total weight.

Page 2383 of 3073 ends

Lighting: LED Luminaires
16510-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

2. Install luminaires plumb and square with building and wall intersections:
a. Suspend pendant-mounted luminaries that are mounted from sloping ceilings with ball hangers, unless otherwise indicated on the Drawings. b. Install luminaires in machinery rooms after machines have been installed, so as to ensure no conflict with machinery, piping, or ductwork.

3. In all cases, coordinate luminaire locations with work of other trades to prevent obstruction of light from the fixtures:
a. Locate bottom of luminaire approximately at the bottom of ductwork, unless otherwise specified or indicated on the Drawings.

4. Support luminaires weighing more than 25 pounds independently of the outlet box and the conduit.

5. Provide ceiling or pendent mounted luminaires with a safety chain connecting the lens, driver, and other components to the building structure.

6. Provide recessed luminaires with auxiliary safety supports attached directly to the building structure:
a. The safety supports shall consist of number 12 AWG soft drawn galvanized wires.

7. Install luminaires in accordance with the architectural reflected ceiling Drawings:
a. Center luminaires on ceiling tiles unless otherwise indicated.

8. Support luminaires installed in suspended grid ceilings, independently of the grid:
a. Provide seismic restraint clips for all luminaires installed in suspended grid ceilings.

C. Luminaire poles:

1. Set poles on anchor bolts and secured with double nuts on each bolt.

2. Dry-pack the pole base, after the luminaire and pole has been leveled and plumbed.

3. Bond metal poles to the plant grounding system, utilizing a ground lug connection within the pole:
a. Route ground conductor through pier and pole base sleeve using Schedule 40 PVC conduit.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. As specified in Section 01756 - Commissioning.

3.08 FIELD QUALITY CONTROL

3.09 ADJUSTING
A. Aim and verify all exterior and outdoor luminaires alignment, during dark evening hours, as directed by Owner or the Engineer.

Page 2384 of 3073 ends

Lighting: LED Luminaires
16510-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16510 (BidSetFinal)

3.10 CLEANING
A. Clean all lenses, diffusers, and reflectors.

B. Refinish all luminaires’ trim, poles, and support brackets, where finish has been damaged.

C. Clean all LED luminaires (new and old), used during construction for construction lighting, before substantial completion.

D. Clean and re-lamp all existing fluorescent and HID luminaires used during construction for construction lighting, before substantial completion.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES
A. Refer to the Luminaire Schedule in the Drawings.

END OF SECTION

Page 2385 of 3073 ends

Field Electrical Acceptance Tests
16950-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) SECTION 16950

FIELD ELECTRICAL ACCEPTANCE TESTS

TABLE OF CONTENTS
PART 1 GENERAL................................................................................................................. 3

1.01 SUMMARY ................................................................................................................... 3 A. Section includes:................................................................................................ 3 B. Copyright information:........................................................................................ 3

1.02 REFERENCES ............................................................................................................. 3 A. General standards: ............................................................................................ 3 B. National standards:............................................................................................ 3

1.03 DEFINITIONS............................................................................................................... 3 A. Project definitions:.............................................................................................. 3 B. Specific definitions: ............................................................................................ 3

1.04 SYSTEM DESCRIPTION ............................................................................................. 4 A. General requirements: ....................................................................................... 4 B. Responsibilities:................................................................................................. 4

1.05 SUBMITTALS............................................................................................................... 4 A. General submittal requirements:........................................................................ 4 B. Copper Ethernet test form:................................................................................. 4 C. Manufacturers’ testing procedures:.................................................................... 5 D. Test report:......................................................................................................... 5 E. Test data records:.............................................................................................. 5 F. Testing laboratory qualifications: ....................................................................... 5 G. Division of responsibilities:................................................................................. 5

1.06 QUALITY ASSURANCE............................................................................................... 6 A. Testing laboratory qualifications: ....................................................................... 6

1.07 DELIVERY, STORAGE, AND PROTECTION (NOT USED)........................................ 6

1.08 PROJECT OR SITE CONDITIONS.............................................................................. 6 A. General site and project conditions:................................................................... 6

1.09 SEQUENCING ............................................................................................................. 6 A. Prior to testing:................................................................................................... 6 B. Perform testing in the following sequence: ........................................................ 6

1.10 SCHEDULING (NOT USED)........................................................................................ 6

1.11 WARRANTY................................................................................................................. 6 A. As specified in Section 01783 - Warranties and Bonds. .................................... 6

1.12 SYSTEM START-UP (NOT USED).............................................................................. 6

1.13 OWNER'S INSTRUCTIONS (NOT USED)................................................................... 7

1.14 MAINTENANCE (NOT USED) ..................................................................................... 7 PART 2 PRODUCTS (NOT USED) ........................................................................................ 7 PART 3 EXECUTION ............................................................................................................. 7

3.01 EXAMINATION (NOT USED)....................................................................................... 7

3.02 PREPARATION ............................................................................................................ 7 A. Test instrument calibration:................................................................................ 7 B. Requirements prior to testing:............................................................................ 7

3.03 INSTALLATION............................................................................................................ 7 A. Test decal: ......................................................................................................... 7

Page 2386 of 3073 ends

Field Electrical Acceptance Tests
16950-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal)

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)......... 8

3.05 REPAIR/RESTORATION (NOT USED) ....................................................................... 8

3.06 RE-INSTALLATION (NOT USED)................................................................................ 8

3.07 COMMISSIONING........................................................................................................ 8 A. General commissioning requirements: .............................................................. 8 B. Testing and Training Phase: Installation Testing:.............................................. 8 C. Panelboards:...................................................................................................... 8 D. Switchgear and switchboard:...........................................................................10 E. Dry type transformers: .....................................................................................13 F. Low voltage cables, 600 volt maximum: ..........................................................14 G. Low voltage molded case and insulated case circuit breakers: .......................14 H. Instrument transformers - current transformers: ..............................................16 I. Instrument transformers - voltage transformers: ..............................................18 J. Metering devices, microprocessor based: .......................................................19 K. Metering devices electromechanical and solid state:.......................................20 L. Grounding systems:.........................................................................................21 M. Rotating machinery, ac induction motors and generators:...............................21 N. Motor starters, low voltage:..............................................................................23 O. Variable frequency drive systems:...................................................................25 P. Surge arresters, low-voltage:...........................................................................26 Q. Switches, air, medium-voltage, metal-enclosed:..............................................27 R. Fiber-optic cables:............................................................................................29 S. Copper Ethernet cable installation testing: ......................................................30

3.08 FIELD QUALITY CONTROL (NOT USED) ................................................................30

3.09 ADJUSTING (NOT USED) .........................................................................................30

3.10 CLEANING .................................................................................................................30 A. As specified in Section 16050 - Common Work Results for Electrical.............30 B. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas. ..30

3.11 PROTECTION (NOT USED)......................................................................................30

3.12 SCHEDULES (NOT USED)........................................................................................30

Page 2387 of 3073 ends

Field Electrical Acceptance Tests
16950-3 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) PART 1 GENERAL

1.01 SUMMARY
A. Section includes:

1. Responsibilities for testing the electrical installation.

2. Adjusting and calibration.

3. Acceptance tests.

B. Copyright information:

1. Some portions of this Section are copyrighted by the InterNational Electrical Testing Association, Inc. (NETA). See NETA publication ATS for details.

1.02 REFERENCES
A. General standards:

1. As specified in Section 16050 - Common Work Results for Electrical.

2. Specification sections for the electrical equipment being tested.

3. Shop drawings.

B. National standards:

1. American National Standards Institute (ANSI).

2. Institute of Electrical and Electronics Engineers (IEEE):
a. 43 - IEEE Recommended Practice for Testing Insulation Resistance of Rotating Machinery.
b. 81 - IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System.
c. C57.13 - IEEE Standard Requirements for Instrument Transformers. d. C57.13.1 - IEEE Guide for Field Testing of Relaying Current Transformers.
e. C57.13.3 - IEEE Guide for Grounding of Instrument Transformer Secondary Circuits and Cases.

3. Insulated Cable Engineer’s Association (ICEA).

4. InterNational Electrical Testing Association (NETA). a. ATS- Standard for Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems.

5. International Electrotechnical Commission (IEC).

6. Manufacturer’s testing recommendations and instruction manuals.

7. National Fire Protection Association (NFPA):
a. 70 - National Electrical Code (NEC).
b. 110 - Standard for Emergency and Standby Power Systems.

8. National Institute of Standards and Technology (NIST).

1.03 DEFINITIONS
A. Project definitions:

1. As specified in Sections 01756 - Commissioning and 16050 - Common Work Results for Electrical.

B. Specific definitions:

1. Testing laboratory: The organization performing acceptance tests.

Page 2388 of 3073 ends

Field Electrical Acceptance Tests
16950-4 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal)

1.04 SYSTEM DESCRIPTION
A. General requirements:

1. Testing of all electrical equipment installed under this Contract in accordance with the manufacturer’s requirements and as specified in this Section.

2. Conduct all tests in the presence of the Engineer or the Engineer’s representative:
a. Engineer will witness all visual, mechanical, and electrical tests, and inspections.

3. The testing and inspections shall verify that the equipment is operational within the tolerances required and expected by the manufacturer, and these Specifications.

B. Responsibilities:

1. Contractor responsibilities:
a. Ensure that all resources are made available for testing, and that all testing requirements are met.

2. Electrical subcontractor responsibilities:
a. Perform routine tests during installation.
b. Demonstrate operation of electrical equipment.
c. Commission the electrical installation.
d. Provide the necessary services during testing, and provide these services to the testing laboratory, Contractor, and other subcontractors, including but not limited to:
1) Providing electrical power as required.
2) Operating of electrical equipment in conjunction with testing of other equipment.
3) Activating and shutting down electrical circuits.
4) Making and recording electrical measurements.
5) Replacing blown fuses.
6) Installing temporary jumpers.

3. Testing laboratory responsibilities:
a. Perform all acceptance tests specified in this Section. b. Provide all required equipment, materials, labor, and technical support during acceptance tests.

1.05 SUBMITTALS
A. General submittal requirements:

1. Furnish submittals as specified in Section 01330 - Submittal Procedures.

B. Copper Ethernet test form:

1. Cable test reports:
a. Submit 3 copies of test reports showing the results of all tests specified in this Section:
1) Test type.
2) Test location.
3) Test date.

Page 2389 of 3073 ends

Field Electrical Acceptance Tests
16950-5 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) 4) Cable number.
5) Cable length.
6) Certification that the cable meets or exceeds the specified standard. b. Furnish hard copy and electronic copy for all traces.

C. Manufacturers’ testing procedures:

1. Submit manufacturers’ recommended testing procedures and acceptable test results for review by the Engineer prior to beginning testing.

D. Test report:

1. Include the following:
a. Summary of Project.
b. Description of equipment tested.
c. Description of tests performed.
d. Test results.
e. Conclusions and recommendations.
f. Completed test forms.
g. List of test equipment used and calibration dates.
h. LAN cable test reports.

E. Test data records:

1. Include the following:
a. Identification of the testing organization.
b. Equipment identification.
c. Nameplate data.
d. Humidity, temperature and or other conditions that may affect the results of the tests and or calibrations.
e. Dates of inspections, tests, maintenance and or calibrations. f. Indication of the inspections, tests, maintenance, and or calibrations to be performed and recorded.
g. Expected results when calibrations are to be performed. h. Indication of as-found and as-left results as applicable. i. Indication of all test results outside specified tolerances.

F. Testing laboratory qualifications:

1. Submit a complete resume and statement of qualifications from the proposed testing laboratory detailing their experiences in performing the tests specified:
a. This statement will be used to determine whether the laboratory is acceptable, and shall include:
1) Corporate history and references.
2) Resume of individual performing test.
3) Equipment list and test calibration data.

G. Division of responsibilities:

1. Submit a list identifying who is responsible for performing each portion of the testing.

Page 2390 of 3073 ends

Field Electrical Acceptance Tests
16950-6 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal)

1.06 QUALITY ASSURANCE
A. Testing laboratory qualifications:

1. The testing laboratory may be qualified testing personnel from the electrical subcontractor’s staff or an independent testing company.

2. NETA certification required.

3. Selection of the testing laboratory and testing personnel is subject to approval by the Engineer based on testing experience and certifications of the individuals and testing capabilities of the organization.

1.07 DELIVERY, STORAGE, AND PROTECTION (NOT USED)

1.08 PROJECT OR SITE CONDITIONS
A. General site and project conditions:

1. As specified in Section 01850 - Design Criteria.

1.09 SEQUENCING
A. Prior to testing:

1. At least 30 days before commencement of the acceptance tests, submit the manufacturer’s complete field testing procedures to the Engineer and to the testing laboratory, complete with expected test results and tolerances for all equipment to be tested.

B. Perform testing in the following sequence:

1. Perform routine tests as the equipment is installed including:
a. Insulation-resistance tests.
b. Continuity tests.
c. Rotational tests.

2. Adjusting and preliminary calibration.

3. Acceptance tests.

4. Demonstration.

5. Commissioning and plant start-up.

1.10 SCHEDULING (NOT USED)

1.11 WARRANTY
A. As specified in Section 01783 - Warranties and Bonds.

1.12 SYSTEM START-UP (NOT USED)

Page 2391 of 3073 ends

Field Electrical Acceptance Tests
16950-7 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal)

1.13 OWNER'S INSTRUCTIONS (NOT USED)

1.14 MAINTENANCE (NOT USED)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 EXAMINATION (NOT USED)

3.02 PREPARATION
A. Test instrument calibration:

1. Utilize a testing laboratory with a calibration program which maintains all applicable test instrumentation within rated accuracy.
a. The calibrating standard shall be of better accuracy than that of the equipment tested.

2. The accuracy shall be traceable to the NIST in an unbroken chain.

3. Calibrate instruments in accordance with the following frequency schedule:
a. Field instruments: 6 months maximum.
b. Laboratory instruments: 12 months maximum.
c. Leased specialty equipment where the accuracy is guaranteed by the lessor (such as Doble): 12 months maximum.

4. Dated calibration labels shall be visible on all test equipment.

5. Maintain an up-to-date instrument calibration record for each test instrument:
a. The records shall show the date and results of each calibration or test.

6. Maintain an up-to-date instrument calibration instruction and procedure for each test instrument.

B. Requirements prior to testing:

1. Do not begin testing until the following conditions have been met:
a. All instruments required are available and in proper operating condition. b. All required dispensable materials such as solvents, rags, and brushes are available.
c. All equipment handling devices such as cranes, vehicles, chain falls and other lifting equipment are available or scheduled.
d. All instruction books, calibration curves, or other printed material to cover the electrical devices are available.
e. Data sheets to record all test results are available.

3.03 INSTALLATION
A. Test decal:

1. The testing laboratory shall affix a test decal on the exterior of equipment or equipment enclosure of protective devices after performing electrical tests.

Page 2392 of 3073 ends

Field Electrical Acceptance Tests
16950-8 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal)

2. The test decal shall be color coded to communicate the condition of maintenance of the protective. The color scheme for condition of maintenance of overcurrent protective devices shall be:
a. White: electrically and mechanically acceptable.
b. Yellow; minor deficiency not affecting fault detection and operation, but minor electrical or mechanical condition exists.

3. The decal shall include the following information at a minimum:
a. Testing organization.
b. Project identifier.
c. Test date.
d. Technician identifier.

3.04 ERECTION, INSTALLATION, APPLICATION, CONSTRUCTION (NOT USED)

3.05 REPAIR/RESTORATION (NOT USED)

3.06 RE-INSTALLATION (NOT USED)

3.07 COMMISSIONING
A. General commissioning requirements:

1. As specified in Section 01756 - Commissioning.

B. Testing and Training Phase: Installation Testing:

1. Also called "Field Acceptance Testing".

C. Panelboards:

1. Cleaning:
a. Visually inspect panelboard for evidence of discoloration, abnormal dust accumulation, metal shards, or any other indication of overheating, wear, or other abnormal conditions prior to cleaning.
b. Clean cabinet with a brush, vacuum cleaner, or clean, dry, lint-free rags to remove any accumulation of dust, dirt, or other foreign matter. Do not use liquids, solvents or detergents when cleaning panelboards or components. c. Avoid blowing dust into panelboards. Do not use a blower or compressed air.
d. Clean Supports, terminals, and other major insulating surfaces with clean, dry, lint-free rags or soft bristled brushes.
e. Remove dust, soot, grease, moisture, and foreign material from surface of circuit breakers.

2. General:
a. Compare equipment nameplate data with the Contract Documents. b. Check panelboard circuit schedule for accuracy.
c. Verify appropriate anchorage, required area clearances, and correct alignment.
d. Inspect overall general condition for physical damage. Check for broken studs and loose or damaged wires, connector, terminations, etc. Check all bolts, nuts, washer, and pins for tightness. Tighten or use manufacture’s replacement parts as required.

Page 2393 of 3073 ends

Field Electrical Acceptance Tests
16950-9 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) e. Inspect cabinets for signs of rust, corrosion, or deteriorating paint. Inspect cabinets for evidence of localized heat damage to the paint. Investigate sources of heat. Repair painted surfaces.
f. Check that covers are in place and fastened. Plug any open unused knockouts.
g. Inspect panelboard for moisture. Seal off any cracks or openings which have allowed moisture to enter the cabinet. Inspect all component devices. Replace any components that show evidence of damage from moisture.
h. Look for any recent changes in sprinklers or other plumbing that might expose indoor panelboards to a source of liquids. Eliminate sources of water, moisture, or liquids, or provide adequate barriers to protect panelboards from sources of water, moisture, or liquids. i. Inspect panelboards and internal components for evidence of overheating, arc spatter, sooty deposits, and tracking. Investigate and correct sources of arcing or overheating. Consult the panelboard manufacturer for recommendations.
j. Verify that fuse and/or circuit breaker sizes and types correspond to record drawings, if available, as well as to the circuit breaker’s address for microprocessor communications packages, if equipped.
k. Set adjustable circuit breakers in accordance with engineering coordination study supplied by Contractor.

3. Terminations, Connections, and Lugs:
a. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
a) Compare bolted connection resistance values to values of similar connections:
(1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
b. Inspect terminations, connection, and lugs for alignment, physical damage, burns, corrosion, discoloration, flaking, heat damage, arcing, pitting, melting, deterioration, carbonization, cracks, chips, breaks, partial discharge, or moisture. Investigate and eliminate sources of any damage. c. Follow manufacturer recommendations for cleaning, repairing, and replacing damaged parts.
d. Replace overheated connections. Tighten connections to proper torque levels as specified above.

4. Conductors and raceways:
a. Inspect supply conductors and terminations for overheating, discoloration, and oxidation. Investigate and correct any deficiencies. b. Ensure the conductors are protected within their ampacities. c. Visually check panelboard, cables, and raceways for proper bonding and grounding. Correct improper bonding and grounding.

Page 2394 of 3073 ends

Field Electrical Acceptance Tests
16950-10 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Inspect conductors for discoloration, arcing, pitting, melting, flaking of insulation and/or metal parts. Repair or replace damaged components in accordance with manufacturer’s recommendations.
e. Inspect for frayed or broken wires. Replace or repair damaged components in accordance with manufacturer recommendations. f. Inspect for frayed or broken wires. Replace or repair conductors as necessary.
g. Inspect conduits for moisture. Seal conduits which are a source of moisture and provide means to drain moisture away from the panelboard.

5. Circuit breakers:
a. Breakers rated less than 100 A:
1) Operate circuit breakers several times in order to exercise the mechanisms and the contacts, and to ensure smooth operation. Do not oil or grease parts of molded case circuit breakers. 2) Visually check circuit breakers for evidence of overheating and thermal damage. Investigate and eliminate sources of overheating. 3) Check circuit breakers for visual defects, chipping, cracks, breaks, burns, and deterioration. Replace damaged circuit breakers. 4) Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, and antipump function.
5) Inspect interchangeable trip-unit circuit breakers for tightness of trip units.
6) Check circuit breaker terminals and connections for tightness as specified above.
b. Breakers rated 100 A and higher:
1) Perform visual and mechanical inspection as specified in this Section.
2) Perform electrical tests as specified in this Section.

D. Switchgear and switchboard:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding and required area clearances. d. Verify the unit is clean and all shipping bracing, loose parts, and documentation shipped inside cubicles have been removed. e. Verify that circuit breaker/fuse sizes and types correspond to the approved submittals and the coordination study as well as to the circuit breakers address for microprocessor-communication packages. f. Verify that current and voltage transformer ratios correspond to those indicated on the Drawings.
g. Verify that wiring connections are tight and that wiring is secure to prevent damage during routine operation of moving parts.
h. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.

Page 2395 of 3073 ends

Field Electrical Acceptance Tests
16950-11 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) i. Verify operation and sequencing of interlocking systems:
1) Attempt closure on locked-open devices.
2) Attempt to open locked-closed devices.
3) Make/attempt key-exchanges in all positions.
j. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
k. Inspect insulators for evidence of physical damage or contaminated surfaces.
l. Verify correct barrier and shutter installation and operation. m. Exercise all active components.
n. Inspect mechanical indicating devices for correct operation. o. Verify that filters are in place and/or vents are clear. p. Perform visual and mechanical inspection of instrument transformers as specified in this Section.
q. Perform visual and mechanical inspection of surge arresters as specified in this Section.
r. Inspect control power transformers:
1) Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.
2) Verify that primary and secondary fuse/circuit breaker ratings match the submittal drawings.
3) Verify correct functioning of drawout disconnecting contacts, grounding contacts, and interlocks.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests on each bus section, phase-to-phase and phase-to-ground for 1 minute.
1) Perform test in accordance with NETA ATS tables.
c. Perform electrical tests on instrument transformers as specified in this Section.
d. Perform ground-resistance tests:
1) Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, system neutral and derived neutral points.
e. Test metering devices as specified in this Section.
f. Control power transformers:
1) Perform insulation-resistance tests. Perform measurements from winding-to-winding and each winding-to-ground:
a) Test voltages shall be in accordance with NETA ATS tables or as specified by the manufacturer.
b) Perform a turns-ratio test on all tap positions.
2) Perform secondary wiring integrity test:
a) Disconnect transformer at secondary terminals and connect secondary wiring to a rated secondary voltage source:
(1) Verify correct potential at all devices.
3) Verify correct secondary voltage by energizing primary winding with system voltage:
a) Measure secondary voltage with the secondary wiring
disconnected.

Page 2396 of 3073 ends

Field Electrical Acceptance Tests
16950-12 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) g. Perform current injection tests on the entire current circuit of each switchgear or switchboard:
1) Perform current tests by secondary injection with magnitudes such that a minimum current of 1.0 ampere flows in the secondary circuit:
a) Verify the correct magnitude of current at each device in the circuit.
h. Perform system function tests.
i. Verify operation of space heaters.
j. Perform electrical tests of surge arresters as specified in this Section.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of bus insulation shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. 3) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
d. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
e. Instrument transformer test values shall be as specified in this Section. f. Meter test values shall be as specified in this Section. g. Investigate grounding system point-to-point resistance values that exceed

0.5 ohm.
h. Control power transformers:
1) Insulation-resistance values of control power transformers shall be in accordance with manufacturer’s published data:
a) Refer to NETA ATS tables in the absence of manufacturer’s published data.
b) Investigate insulation values less than the allowable minimum. 2) Turns-ratio test results shall not deviate by more than 1/2 percent from either the adjacent coils or the calculated ratio. a) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
3) Secondary wiring shall be as indicated on the Drawings and specified in the Specifications.
4) Secondary voltage shall be as indicated on the Drawings. i. Current-injection tests shall prove current wiring is as indicated on the Drawings and specified in the Specifications.
j. Results of system function tests shall match the drawings and Specifications.
k. Heaters shall be operational.

Page 2397 of 3073 ends

Field Electrical Acceptance Tests
16950-13 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) l. Phasing checks shall prove the switchgear or switchboard phasing is correct and in accordance with the system design.
m. Results of electrical tests on surge arresters shall be as specified in this Section.

E. Dry type transformers:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Verify that resilient mounts are free and that any shipping brackets have been removed.
e. Inspect equipment for cleanliness.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that as-left tap connections are as specified.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests winding-to-winding and each winding-to-ground:
1) Apply voltage in accordance with manufacturer’s published data. a) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Calculate dielectric absorption ration or polarization index. d. Verify correct secondary voltage, phase-to-phase and phase-to-neutral after energization and before loading.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Tap connections are left as found unless otherwise specified. d. Minimum insulation-resistance values of transformer insulation shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. e. The dielectric absorption ratio or polarization index shall not be less than

1.0.

Page 2398 of 3073 ends

Field Electrical Acceptance Tests
16950-14 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) f. Turns-ratio results should not deviate more than 1/2 percent from either the adjacent coils or calculated ratio.
g. Phase-to-phase and phase-to-neutral secondary voltages shall be in agreement with nameplate data.

F. Low voltage cables, 600 volt maximum:

1. Visual and mechanical inspection:
a. Compare cable data with the Drawings and Specifications. b. Inspect exposed sections of cable for physical damage and correct connection as indicated on the Drawings.
c. Inspect bolted electrical connections for high resistance by one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect compression applied connectors for correct cable match and indentation.
e. Inspect for correct identification and arrangement.
f. Inspect cable jacket insulation and condition.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation resistance test on each conductor sized No. 8 AWG or larger with respect to ground and adjacent conductors:
1) Applied potential shall be 500 volts dc for 300 volt rated cable and 1,000 volts dc for 600 volt rated cable.
2) Test duration shall be 1 minute.
c. Perform continuity tests on all power and control conductors to insure correct cable connection.
d. Verify uniform resistance of parallel conductors.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.
c. Cable shall exhibit continuity.
d. Deviations in resistance between parallel conductors shall be investigated.

G. Low voltage molded case and insulated case circuit breakers:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.

Page 2399 of 3073 ends

Field Electrical Acceptance Tests
16950-15 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) c. Inspect anchorage and alignment.
d. Verify the unit is clean.
e. Operate the circuit breaker to ensure smooth operation. f. Inspect bolted electrical connections for high resistance by one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Perform adjustments for final protective device settings in accordance with the coordination study.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase-to-ground with the circuit breaker closed and across each open pole:
1) Apply voltage in accordance with manufacturer’s published data. 2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Perform a contact/pole-resistance test.
d. Determine long-time pickup and delay by primary current injection. e. Determine short-time pickup and delay by primary current injection. f. Determine ground-fault pickup and delay by primary current injection. g. Determine instantaneous pickup value by primary current injection. h. Perform minimum pickup voltage tests on shunt trip and close coils in accordance with manufacturer’s published data.
i. Verify correct operation of any auxiliary features such as trip and pickup indicators, zone interlocking, electrical close and trip operation, trip-free, anti-pump function and trip unit battery condition:
1) Reset all trip logs and indicators.
j. Verify operation of charging mechanism.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.

Page 2400 of 3073 ends

Field Electrical Acceptance Tests
16950-16 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data:
1) If manufacturer’s data is not available, investigate any values which deviate from adjacent poles or similar breakers by more than 50 percent of the lowest value.
e. Long-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current characteristic tolerance band including adjustment factors:
1) If manufacturer’s curves are not available, trip times shall not exceed the value shown in NETA ATS tables.
f. Short-time pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. g. Ground fault pickup values shall be as specified, and the trip characteristic shall not exceed manufacturer’s published time-current tolerance band. h. Instantaneous pickup values shall be as specified and within manufacturer’s published tolerances:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
i. Pickup values and trip characteristics shall be within manufacturer’s published tolerances.
j. Determine energy reducing maintenance switch pickup value by primary current injection.
k. Breaker open, close, trip, trip-free, anti-pump, and auxiliary features shall function as designed.
l. The charging mechanism shall operate in accordance with manufacturer’s published data.

H. Instrument transformers - current transformers:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements. d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify the unit is clean.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that all required grounding and shorting connections provide contact.
h. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.

Page 2401 of 3073 ends

Field Electrical Acceptance Tests
16950-17 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) b. Perform insulation-resistance test of each current transformer and its secondary wiring with respect to ground at 1,000 VDC for 1 minute:
1) For solid state devices that cannot tolerate the applied voltage, follow the manufacturer’s recommendation.
c. Perform a polarity test of each current transformer in accordance with IEEE C57.13.1.
d. Perform a ratio verification test using the voltage or current method in accordance with IEEE C57.13.1.
e. Perform an excitation test on current transformers used for relaying applications in with accordance with IEEE C57.13.1.
f. Measure current circuit burdens at transformer terminals in accordance with IEEE C57.13.1.
g. When applicable perform insulation-resistance tests on the primary winding with the secondary grounded:
1) Test voltages shall be in accordance with NETA ATS tables. h. Perform power-factor or dissipation-factor tests in accordance with test equipment manufacturer’s published data.
i. Verify that current transformer secondary circuits are grounded and have only 1 grounding point in accordance with IEEE C57.13.3:
1) That grounding point should be located as specified by the Engineer in the Contract Documents.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of instrument transformers shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Polarity results shall agree with transformer markings. e. Ratio errors shall be in accordance with IEEE C57.13. f. Excitation results for current transformers shall match the curve supplied by the manufacturer or be in accordance with IEEE C57.13.1. g. Measured burdens shall be compared to instrument transformer ratings. h. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the primary winding is considered to have passed the test.
i. Power-factor or dissipation-factor values shall be compared to manufacturer’s published data:
1) In the absence manufacturer’s published data, use the test equipment manufacturer's published data.
j. Test results shall indicate that the circuits have only 1 grounding point.

Page 2402 of 3073 ends

Field Electrical Acceptance Tests
16950-18 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) I. Instrument transformers - voltage transformers:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Verify correct connection of transformers with system requirements. d. Verify that adequate clearances exist between primary and secondary circuit wiring.
e. Verify the unit is clean.
f. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
g. Verify that all required grounding and connections provide contact. h. Verify correct primary and secondary fuse sizes for voltage transformers. i. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.
j. Perform as-left tests.

2. Electrical tests - voltage transformers:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests winding-to-winding and winding-to-ground:
1) Test voltage shall be applied for 1 minute in accordance with NETA ATS requirements.
2) For solid state devices that cannot tolerate the applied voltage, follow the manufacturer’s recommendation.
c. Perform a polarity test on each voltage transformer to verify the polarity marks on H1- X1 relationship as applicable.
d. Perform a turns ratio test on all tap positions.
e. Measure voltage circuit burdens at transformer terminals. f. Perform a dielectric withstand test on the primary windings with the secondary windings grounded:
1) The dielectric voltage shall be in accordance with NETA ATS tables. 2) Apply the test voltage for 1 minute.
g. Perform power-factor or dissipation-factor tests in accordance with test equipment manufacturers published data.
h. Verify that voltage transformer secondary circuits are grounded and have only 1 grounding point in accordance with IEEE C57.13.3:
1) That grounding point should be located as specified by the Engineer in the Contract Documents.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.

Page 2403 of 3073 ends

Field Electrical Acceptance Tests
16950-19 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values of instrument transformers shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Polarity results shall agree with transformer markings. e. Ratio errors shall be in accordance with IEEE C57.13. f. Measured burdens shall be compared to instrument transformer ratings. g. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the primary winding is considered to have passed the test.
h. Power-factor or dissipation-factor values shall be compared to manufacturer’s published data:
1) In the absence manufacturer’s published data, use the test equipment manufacturer's published data.
i. Test results shall indicate that the circuits have only 1 grounding point.

J. Metering devices, microprocessor based:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect meters and cases for physical damage.
c. Clean front panel.
d. Verify tightness of electrical connections.
e. Record the following:
1) Model number.
2) Serial number.
3) Firmware revision.
4) Software revision.
5) Rated control voltage.
f. Verify operation of display and indicating devices.
g. Record passwords.
h. Verify the unit is grounded in accordance with the manufacturer's instructions.
i. Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements.

2. Electrical tests:
a. Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.
b. Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital and analog.
c. After initial system energization, confirm measurements and indications are consistent with loads present.

3. Test values:
a. Nameplate data shall match the Contract Documents.
b. Tightness of electrical connections shall ensure a low resistance connection.

Page 2404 of 3073 ends

Field Electrical Acceptance Tests
16950-20 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) c. Display and indicating devices shall operate per manufacturer's published data.
d. Measurement and indication of applied voltages and currents shall be within the manufacturer's published tolerances for accuracy. e. All auxiliary input/output features shall operate per settings and manufacturer's published data.
f. Measure and indications shall be consistent with energized system loads.

K. Metering devices electromechanical and solid state:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Record model number, serial number, firmware revision, software revision, and rated control voltage.
e. Verify operation of display and indicating devices.
f. Record passwords.
g. Verify unit is grounded in accordance with manufacturer’s instructions. h. Set all required parameters including instrument transformer ratios, system type, frequency, power demand methods/intervals, and communications requirements.
i. Inspect cover gasket, cover glass, condition of spiral spring, disk clearance, contacts, and case shorting contacts as applicable. j. Verify the unit is clean.

2. Electrical tests:
a. Apply voltage or current as appropriate to each analog input and verify correct measurement and indication.
b. Confirm correct operation and setting of each auxiliary input/output feature including mechanical relay, digital, and analog.
c. After initial system energization, confirm measurements and indications are consistent with loads present.
d. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
e. Verify accuracy of meter at all cardinal points.
f. Calibrate meters in accordance with manufacturer’s published data. g. Verify that current transformer, and voltage transformer secondary circuits are intact.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value.

Page 2405 of 3073 ends

Field Electrical Acceptance Tests
16950-21 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Meter accuracy shall be in accordance with manufacturer’s published data.
d. Calibration results shall be within manufacturer’s published tolerances. e. Instrument multipliers shall be in accordance with system design specifications.
f. Test results shall confirm the integrity of the secondary circuits of current and voltage transformers.

L. Grounding systems:

1. Visual and mechanical inspection:
a. Inspect ground system for compliance with the Contract Documents, and the NEC.
b. Inspect physical and mechanical condition.
c. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
d. Inspect anchorage.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform fall of potential test or alternative test in accordance with IEEE 81 on the main grounding electrode or system.
c. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, the system neutral and any derived neutral points.

3. Test values:
a. Grounding system electrical and mechanical connections shall be free of corrosion.
b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. The resistance between the main grounding electrode and ground shall be as specified in Section 16060 - Grounding and Bonding. e. Investigate point-to-point resistance values that exceed 0.5 ohm.

M. Rotating machinery, ac induction motors and generators:

1. Visual and mechanical inspection:
a. Compare equipment nameplate information with the Contract Documents.

Page 2406 of 3073 ends

Field Electrical Acceptance Tests
16950-22 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Inspect air baffles, filter media, cooling fans, slip rings, brushes, and brush rigging.
e. Inspect bolted electrical connections for high resistance using one or more of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
f. Manually rotate the rotor and check for problems with the bearings or shaft.
g. Rotating equipment:
1) Operate at rated design load conditions.
2) Confirm that equipment is properly assembled.
3) Confirm the equipment moves or rotates in the proper direction. 4) Confirm shafting, drive elements, and bearings are installed and lubricated in accordance with proper tolerances.
5) Confirm that no unusual power consumption, lubrication temperatures, bearing temperatures, or other conditions are observed.
h. Verify correct application of appropriate lubrication and lubrication systems.
i. Verify that resistance temperature detector (RTD) circuits conform to that indicated on the Drawings.

2. Electrical tests - AC Induction:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance test in accordance with IEEE 43:
1) On motors 200 horsepower and smaller, test duration shall be 1 minute. Calculate dielectric absorption ratio for 60/30 second periods.
c. Perform insulation-resistance test on insulated bearings in accordance with manufacturer’s published data.
d. Test surge protection devices as specified in this Section. e. Test motor starter as specified in this Section.
f. Perform resistance tests on resistance temperature detector (RTD) circuits.
g. Verify operation of motor space heater, if applicable.

3. Test values:
a. Inspection:
1) Air baffles shall be clean and installed in accordance with the manufacturer’s published data.
2) Filter media shall be clean and installed in accordance with the manufacturer’s published data.
3) Cooling fans shall operate.
4) Slip ring alignment shall be within manufacturer’s published tolerances.
5) Brush alignment shall be within manufacturer’s published tolerances. 6) Brush rigging shall be within manufacturer’s published tolerances.

Page 2407 of 3073 ends

Field Electrical Acceptance Tests
16950-23 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) b. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. c. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
d. Airgap spacing and machine alignment shall be in accordance with manufacturer’s published data.
e. The recommended minimum insulation-resistance (IR1 min) test results in megohms shall be in accordance with NETA ATS tables.
1) The polarization index value shall not be less than 2.0. 2) The dielectric absorption ratio shall not be less than 1.4. f. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.
g. Investigate phase-to-phase stator resistance values that deviate by more than 5 percent.
h. Power factor or dissipation factor values shall be compared to manufacturer’s published data:
1) In the absence of manufacturer’s published data, compare values of similar machines.
i. Tip-up values shall indicate no significant increase in power factor. j. If no evidence of distress, insulation failure, or waveform nesting is observed by the end of the total time of voltage application during the surge comparison test, the test specimen is considered to have passed the test.
k. Bearing insulation-resistance measurements shall be within manufacturer’s published tolerances:
1) In the absence of manufacturer’s published data, compare values of similar machines.
l. Test results of surge protection devices shall be as specified in this Section.
m. Test results of motor starter equipment shall be as specified in this Section.
n. RTD circuits shall conform to the design intent and machine protection device manufacturer’s published data.
o. Heaters shall be operational.
p. Vibration amplitudes of the uncoupled and unloaded machine shall be in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, vibration amplitudes shall not exceed values in NETA ATS tables.
2) If values exceed those in the NETA ATS tables, perform a complete vibration analysis.

N. Motor starters, low voltage:

1. Visual and mechanical inspection:
a. Compare equipment nameplate information with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.

Page 2408 of 3073 ends

Field Electrical Acceptance Tests
16950-24 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Verify the unit is clean.
e. Inspect contactors:
1) Verify mechanical operation.
2) Verify contact gap, wipe, alignment, and pressure is in accordance with manufacturer’s published data.
f. Motor-running protection:
1) Verify overload element rating/motor protection settings are correct for its application.
2) If motor running protection is provided by fuses, verify correct fuse rating.
g. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
h. Lubrication requirements:
1) Verify appropriate lubrication on moving current-carrying parts. 2) Verify appropriate lubrication on moving and sliding surfaces.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase to ground with the starter closed, and across each open pole for 1 minute:
1) Test voltage shall be in accordance with manufacturer’s published data.
2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Test motor protection devices in accordance with manufacturer’s published data.
d. Test circuit breakers as specified in this Section.
e. Perform operational tests by initiating control devices.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate values of insulation-resistance less than the allowable minimum.

Page 2409 of 3073 ends

Field Electrical Acceptance Tests
16950-25 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Motor protection parameters shall be in accordance with manufacturer’s published data.
e. Circuit breaker test results shall as be specified in this Section. f. Control devices shall perform in accordance with system design requirements.

O. Variable frequency drive systems:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, and grounding.
d. Verify the unit is clean.
e. Ensure vent path openings are free from debris and that heat transfer surfaces are clean.
f. Verify correct connections of circuit boards, wiring, disconnects, and ribbon cables.
g. Motor running protection:
1) Verify drive overcurrent setpoints are correct for their application. 2) If drive is used to operate multiple motors, verify individual overload element ratings are correct for their application.
3) Apply minimum and maximum speed setpoints. Verify setpoints are within limitations of the load coupled to the motor.
h. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
i. Verify correct fuse sizing in accordance with manufacturer’s published data.
j. Perform visual and mechanical inspection of input circuit breaker as specified in this Section.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with low resistance ohmmeter.
b. Test the motor overload relay elements by injecting primary current through the overload circuit and monitoring trip time of the overload element.
c. Test for the following parameters in accordance with relay calibration procedures specified in NETA ATS or as recommended by the manufacturer:
1) Input phase loss protection.
2) Input overvoltage protection.
3) Output phase rotation.
4) Overtemperature protection.
5) Direct current overvoltage protection.
6) Overfrequency protection.
7) Drive overload protection.
8) Fault alarm outputs.

Page 2410 of 3073 ends

Field Electrical Acceptance Tests
16950-26 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Harmonic distortion measurements for both voltage and current is within the specification limits at the installed site.
e. Peak voltage at the motor terminations is less than 90 percent of the motor insulation dielectric withstand level.
f. Perform continuity tests on bonding conductors as specified in accordance with NETA ATS.
g. Perform start-up of drive in accordance with manufacturer’s published data. Calibrate drive to the system’s minimum and maximum speed control signals.
h. Perform operational tests by initiating control devices:
1) Slowly vary drive speed between minimum and maximum. Observe motor and load for unusual noise or vibration.
2) Verify operation of drive from remote start/stop and speed control signals.
i. Perform electrical tests of input circuit breaker as specified in this Section. j. Measure fuse resistance.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Overload test trip times at 300 percent of overload element rating shall be in accordance with manufacturer’s published time-current curve. d. Test values for input circuit breaker shall be as specified in this Section. e. Relay calibration results shall be as specified in this Section. f. Continuity of bonding conductors shall be in accordance with NETA ATS. g. Control devices shall perform in accordance with system requirements. h. Operational tests shall conform to system design requirements. i. Investigate fuse resistance values that deviate from each other by more than 15 percent.

P. Surge arresters, low-voltage:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding, and clearances. d. Verify the arresters are clean.
e. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of low-resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by the calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
f. Verify that the ground lead on each device is individually attached to a ground bus or ground electrode.

Page 2411 of 3073 ends

Field Electrical Acceptance Tests
16950-27 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) g. Verify that stroke counter is correctly mounted and electrically connected, if applicable.
h. Record stroke counter reading.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Perform an insulation-resistance test on each arrester, phase terminal-to-ground:
1) Apply voltage in accordance with manufacturers published data. 2) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Test grounding connection as specified in this Section.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. d. Resistance between the arrester ground terminal and the ground system shall be less than 0.5 ohm.

Q. Switches, air, medium-voltage, metal-enclosed:

1. Visual and mechanical inspection:
a. Compare equipment nameplate data with the Contract Documents. b. Inspect physical and mechanical condition.
c. Inspect anchorage, alignment, grounding, and required clearances. d. Verify the unit is clean.
e. Verify correct blade alignment, blade penetration, travel stops, arc interrupter operation, and mechanical operation.
f. Verify that fuse sizes and types are as indicated on the Drawings, short-circuit study, and coordination study.
g. Verify that expulsion-limiting devices are in place on all holders having expulsion-type elements.
h. Verify that each fuseholder has adequate mechanical support and contact integrity.
i. Inspect bolted electrical connections for high resistance using one of the following methods:
1) Use of a low resistance ohmmeter.
2) Verify tightness of accessible bolted electrical connections by calibrated torque wrench method:
a) Refer to manufacturer’s instructions for proper foot-pound levels or NETA ATS tables.
j. Verify operation and sequencing of interlocking systems.

Page 2412 of 3073 ends

Field Electrical Acceptance Tests
16950-28 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) k. Verify correct phase barrier installation.
l. Verify correct operation of all indicating and control devices. m. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.

2. Electrical tests:
a. Perform resistance measurements through bolted connections with a low-resistance ohmmeter.
b. Measure contact resistance across each switchblade and fuseholder. c. Perform insulation-resistance tests for 1 minute on each pole, phase-to-phase and phase-to ground with switch closed, and across each open pole. Apply voltage in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, use NETA ATS requirements.
d. Perform a dielectric withstand voltage test on each pole with switch closed. Test each pole-to-ground with all other poles grounded. Test voltage shall be in accordance with manufacturer’s published data:
1) In the absence of manufacturer’s published data, use NETA ATS requirements.
e. Measure fuse resistance.
f. Verify cubicle space heater operation.

3. Test values:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Bolt-torque levels shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.

4. Test values - electrical:
a. Compare bolted connection resistance values to values of similar connections:
1) Investigate values which deviate from those of similar bolted connections by more than 50 percent of the lowest value. b. Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data. 1) If manufacturer’s published data is not available, investigate values which deviate from those of similar bus connections and sections by more than 50 percent of the lowest value.
c. Insulation-resistance values shall be in accordance with manufacturer’s published data:
1) Refer to NETA ATS tables in the absence of manufacturer’s published data.
2) Investigate insulation values less than the allowable minimum. 3) Do not proceed with dielectric withstand voltage tests until insulation-resistance values are above minimum values.
d. If no evidence of distress or insulation failure is observed by the end of the total time of voltage application during the dielectric withstand test, the test specimen is considered to have passed the test.

Page 2413 of 3073 ends

Field Electrical Acceptance Tests
16950-29 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) e. Investigate fuse resistance values that deviate from each other by more than 15 percent.
f. Heaters shall be operational.

R. Fiber-optic cables:

1. Visual and mechanical inspection:
a. Compare cable, connector, and splice data with the Contract Documents. b. Inspect cable and connections for physical and mechanical damage. c. Verify that all connectors and splices are correctly installed.

2. Optical tests:
a. Perform cable length measurement, fiber fracture inspection, and construction defect inspection using an optical time domain reflectometer (OTDR):
1) OTDR test performed on fiber cables less than 100 meters shall be performed with the aid of a launch cable.
2) Adjust OTDR pulse width settings to a maximum setting of 1/1,000th of the cable length or 10 nanoseconds.
b. Perform connector and splice integrity test using an optical time domain reflectometer.
c. Perform cable attenuation loss measurement with an optical power loss test set:
1) Perform attenuation tests with an Optical Loss Test Set capable and calibrated to show anomalies of 0.1 dB as a minimum.
2) Test multimode fibers at 850 nanometer and 1,300 nanometer. 3) Test single mode fibers at 1,310 nanometer and 1,550 nanometer. d. Perform connector and splice attenuation loss measurement from both ends of the optical cable with an optical power loss test set:
1) At the conclusion of all outdoor splices at 1 location, and before they are enclosed and sealed, all splices shall be tested with OTDR at the optimal wavelengths (850 and 1,300 for multimode, 1,310 and 1,550 for single mode), in both directions. The splices shall be tested for integrity as well as attenuation.
e. Perform fiber links integrity and attenuation tests using each link shall be an OTDR and an Optical Loss Test Set:
1) OTDR traces shall be from both directions on each fiber at the 2 optimal wavelengths, 850 nanometer, and 1,300 nanometer for multimode fibers.
2) Optical loss testing shall be done with handheld test sets in 1 direction at the 2 optimal wavelengths for the appropriate fiber type.

Test equipment shall equal or exceed the accuracy and resolution of Agilent/HP 8147 high performance OTDR.

3. Test values:
a. Cable and connections shall not have been subjected to physical or mechanical damage.
b. Connectors and splices shall be installed in accordance with industry standards.
c. The optical time domain reflectometer signal should be analyzed for excessive connection, splice, or cable backscatter by viewing the reflected power/distance graph.

Page 2414 of 3073 ends

Field Electrical Acceptance Tests
16950-30 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16950 (BidSetFinal) d. Attenuation loss measurement shall be expressed in dB/km. Losses shall be within the manufacturer’s recommendations when no local site specifications are available.
e. Individual fusion splice losses shall not exceed 0.1 dB. Measurement results shall be recorded, validated by trace, and filed with the records of the respective cable runs.

S. Copper Ethernet cable installation testing:

1. Pre-installation:
a. Immediately prior to installation, verify that cable to be installed matches that which was submitted.
b. Verify that no damage has been done to the cable during shipping or handling.
c. Inspect cable for physical and mechanical damage.
d. Engineer shall be notified if a cable fails to meet inspection and the cable shall not be installed unless otherwise directed by the Engineer.

2. Post-installation:
a. Prior to copper Ethernet cable termination, perform cable end-to-end continuity validation testing on all installed cables, conductor pairs and cable shields using toner and probe kit. Any cable that fails testing shall be removed and replaced.
b. Inspect equipment outlet connectors for damage and ensure connectors hold tightly in field device ports.

3. Test equipment:
a. Certification equipment used for the testing shall be capable of verifying twisted pair cable installation with end-to-end continuity testing. b. Use only test cords and adapters that are qualified by test equipment manufacturer for channel or link test configuration.
c. Manufacturers: The following or equal:
1) Fluke Networks, IntelliTone Pro 200 Toner and Probe Kit, MT-8200-60-KIT.
d. Refer to Section 17950 - Commissioning for Instrumentation and Controls for Permanent Link testing requirements.

3.08 FIELD QUALITY CONTROL (NOT USED)

3.09 ADJUSTING (NOT USED)

3.10 CLEANING
A. As specified in Section 16050 - Common Work Results for Electrical.

B. After the acceptance tests have been completed, dispose of all testing expendables, vacuum all cabinets, and sweep clean all surrounding areas.

3.11 PROTECTION (NOT USED)

3.12 SCHEDULES (NOT USED)

END OF SECTION

Page 2415 of 3073 ends

Conduit Schedule
16990-1 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (BidSetFinal) SECTION 16990

CONDUIT SCHEDULE
PART 1 GENERAL

1.01 SUMMARY
A. Specific definitions:

1. Conduits:
a. ARM: Armored cable.
b. GRC: Galvanized rigid conduit.
c. PCS: PVC jacketed rigid steel conduit.
d. IMC: Intermediate metallic conduit.
e. EMT: Electrical metallic steel tubing.
f. PVC: Polyvinyl chloride rigid plastic conduit.
g. SLT: Sealtight - liquidtight flexible conduit.
h. RAC: Rigid aluminum conduit.
i. FLX: Flexible metallic conduit.
j. NFC: Non-metallic flexible conduit.

2. Cables:
a. DN Thick: DeviceNet “thick” cable.
b. DN Thin: DeviceNet “thin” cable.
c. PBPA: Profibus PA cable.
d. PBDP: Profibus DP cable.
e. PBDPP: Profibus DP cable with 24VDC power.
f. FFBUS: Foundation Fieldbus cable.
g. RS-485 RS-485 cable.
h. CAT5e: Category 5 enhanced Ethernet cable.
i. CAT6: Category 6 Ethernet cable.
j. CNET: ControlNet cable.
k. DH+: Data Highway Plus cable.
l. RIO: Remote I/O cable.
m. DF1: Serial cable.
n. MODB: Modbus cable.
o. MODB+: Modbus Plus cable.
p. */FO: Fiber optic cable (* indicates number of fibers). q. 2/C#16S: 2 conductor, 16 gauge, twisted shielded pair. (*/2/C#16S * indicates number of pairs).
r. 3/C#16S: 3 conductor, 16 gauge, twisted shielded triplet. (*/3/C#16S * indicates number of triplets).
s. */C#Y: Multiconductor cable (* indicates number of conductors, Y indicates conductor size and insulation).
t. MFR: Manufacturer or vendor furnished cable.

Page 2416 of 3073 ends

Conduit Schedule
16990-2 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (BidSetFinal) PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 CONDUIT SCHEDULE
A. As specified in Attachment A - Conduit Schedule.

END OF SECTION

Page 2417 of 3073 ends

Conduit Schedule
16990-Attachment A 8660F10 April 2023
pw://Carollo/Documents/Client/CA/Ukiah/8660F10/Specifications/New Scope/16990 (BidSetFinal)

ATTACHMENT A - CONDUIT SCHEDULE

Page 2418 of 3073 ends
Page 2419 of 3073 ends

PART 1 GENERAL

1.01 SUMMARY
A. Conduit requirements:

1. As defined in Section 16050 and Section 16130.

B. Cable requirements and definitions:

1. As defined in Section 16050 and Section 16123.

2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.

3. 3/CS#16: 3 conductor, 16 gauge, twisted shielded triplet.

4. */C#Y: Multiconductor cable (* indicates number of
conductors, Y indicates conductor size and insulation).

5. CAT6: Category 6 Ethernet cable.

6. MFR: Manufacturer or vendor furnished cable.

7. PULL: Pull Rope.

8. VFD: Shielded VFD cable with integral ground.

PART 2 PRODUCTS
Not Used.

PART 3 EXECUTION

3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.

SECTION 16990

CONDUIT SCHEDULE

AREA WTP RECYCLED WATER PS
April 2023 16990-1 8660F10

Page 2420 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-2011 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99411 C-2015 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99411 CONTROL
2 #12 >> MWH-99411 POWER
C-2012 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99411 C-2015 TO: J-BOX
2 #14 >> AUX3-99411 CONTROL
C-2013 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99411 C-2015 TO: J-BOX
8 #14 >> LCP-99411 CONTROL
C-2015 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99411
2 #14 >> TSH-99411 CONTROL C-2011
2 #12 >> MWH-99411 POWER C-2011
2 #14 >> AUX3-99411 CONTROL C-2012
8 #14 >> LCP-99411 CONTROL C-2013
4 #14 >> FSL-99411 CONTROL C-2019
C-2019 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99411 C-2015 TO: J-BOX
4 #14 >> FSL-99411 CONTROL C-2018
C-2021 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99412 C-2025 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99412 CONTROL
2 #12 >> MWH-99412 POWER
C-2022 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99412 C-2025 TO: J-BOX
2 #14 >> AUX3-99412 CONTROL
C-2023 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99412 C-2025 TO: J-BOX
8 #14 >> LCP-99412 CONTROL
C-2025 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99412
2 #14 >> TSH-99412 CONTROL C-2021
2 #12 >> MWH-99412 POWER C-2021
2 #14 >> AUX3-99412 CONTROL C-2022
8 #14 >> LCP-99412 CONTROL C-2023
4 #14 >> FSL-99412 CONTROL C-2029
C-2029 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99412 C-2025 TO: J-BOX
4 #14 >> FSL-99412 CONTROL C-2028
C-2031 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99413 C-2035 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99413 CONTROL
2 #12 >> MWH-99413 POWER
C-2032 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99413 C-2035 TO: J-BOX
2 #14 >> AUX3-99413 CONTROL
C-2033 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99413 C-2035 TO: J-BOX
8 #14 >> LCP-99413 CONTROL
C-2035 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99413
2 #14 >> TSH-99413 CONTROL C-2031
2 #12 >> MWH-99413 POWER C-2031
2 #14 >> AUX3-99413 CONTROL C-2032
8 #14 >> LCP-99413 CONTROL C-2033
4 #14 >> FSL-99413 CONTROL C-2039
C-2039 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99413 C-2035 TO: J-BOX
4 #14 >> FSL-99413 CONTROL C-2038
C-2041 10E03 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-99414 C-2045 2 #14 XHHW-2 TO: J-BOX
2 #14 >> TSH-99414 CONTROL
2 #12 >> MWH-99414 POWER
C-2042 10E03 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: DISC-99414 C-2045 TO: J-BOX
2 #14 >> AUX3-99414 CONTROL
April 2023 16990-2 8660F10

Page 2421 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-2043 10E03 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-99414 C-2045 TO: J-BOX
8 #14 >> LCP-99414 CONTROL
C-2045 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: J-BOX
10E03 16 #14 XHHW-2 TO: VFD-99414
2 #14 >> TSH-99414 CONTROL C-2041
2 #12 >> MWH-99414 POWER C-2041
2 #14 >> AUX3-99414 CONTROL C-2042
8 #14 >> LCP-99414 CONTROL C-2043
4 #14 >> FSL-99414 CONTROL C-2049
C-2049 10E03 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-99414 C-2045 TO: J-BOX
4 #14 >> FSL-99414 CONTROL C-2048
C-3001 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: ZSOC-99402 C-3005 TO: J-BOX
4 #14 >> ZSOC-99402 CONTROL
C-3002 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: SV1-99402 C-3005 TO: J-BOX
4 #14 >> SV1-99402 CONTROL
C-3003 10E04 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: SV2-99402 C-3005 TO: J-BOX
4 #14 >> SV2-99402 CONTROL
C-3005 10E04 2" 12 #14 XHHW-2 1 #14 XHHW-2 FR: J-BOX C-3105 TO: HH-4
4 #14 >> ZSOC-99402 CONTROL C-3001
4 #14 >> SV1-99402 CONTROL C-3002
4 #14 >> SV2-99402 CONTROL C-3003
C-3100 10E04 0.75" 2 MFR CABLE 1 #14 XHHW-2 FR: LSLL-99403/LSHH-99403 TO: J-BOX
1 MFR >> LSLL-99403 CONTROL
1 MFR >> LSHH-99403 CONTROL
C-3102 10E04 2" 4 #14 XHHW-2 1 #14 XHHW-2 FR: J-BOX
TO: PCM-99400 (VIA HH-4)
2 #14 >> LSLL-99403 CONTROL
2 #14 >> LSHH-99403 CONTROL
C-3105 10E02 2" 12 #14 XHHW-2 1 #14 XHHW-2 FR: HH-4
TO: PCM-99400
4 #14 >> ZSOC-99402 CONTROL C-3005
4 #14 >> SV1-99402 CONTROL C-3005
4 #14 >> SV2-99402 CONTROL C-3005
L-1000 10E02 1.5" 4 #3 XHHW-2 1 #8 XHHW-2 FR: PNL-RWPS-L TO: XFMR-RWPS-L
4 #3 >> PNL-RWPS-L POWER
L-1100 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FCU-99421 TO: CU-99421
2 #12 >> FCU-99421 POWER
L-1101 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: CU-99421 L-1102 TO: DISC-99421
2 #8 >> CU-99421 POWER
L-1102 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: DISC-99421 TO: PNL-RWPS-L
2 #8 >> CU-99421 POWER L-1101
L-1110 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FCU-99422 TO: CU-99422
2 #12 >> FCU-99422 POWER
L-1111 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: CU-99422 L-1112 TO: DISC-99422
2 #8 >> CU-99422 POWER
L-1112 10E02 0.75" 2 #8 XHHW-2 1 #10 XHHW-2 FR: DISC-99422 TO: PNL-RWPS-L
2 #8 >> CU-99422 POWER L-1111
L-1200 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PCM-99400 TO: PNL-RWPS-L
2 #12 >> PCM-99400 POWER NO. 1
April 2023 16990-3 8660F10

Page 2422 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
L-1201 10E02 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PCM-99400 TO: PNL-RWPS-L
2 #12 >> PCM-99400 POWER NO. 2
L-2100 10E03 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: PUMP STATION LIGHTING AND RECEPTACLE TO: PNL-RWPS-L
4 #12 >> LIGHTING AND RECEPTACLE
L-2431 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FIT-99431 10E03 TO: PCM-99400
2 #12 >> FIT-99431 POWER
L-3100 10E04 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: TANK LIGHT AND RECEPTACLE L-3102 TO: HH-4
4 #12 >> TANK LIGHTING AND RECEPTACLE
L-3101 10E04 2" 4 #12 XHHW-2 1 #12 XHHW-2 FR: ROAD LIGHT L-3102 TO: HH-4
4 #12 >> ROAD LIGHTING AND RECEPTACLE
L-3102 10E02 2" 8 #12 XHHW-2 1 #12 XHHW-2 FR: HH-4
TO: PNL-RWPS-L
4 #12 >> ROAD LIGHTING AND RECEPTACLE L-3101
4 #12 >> TANK LIGHTING AND RECEPTACLE L-3100
L-3200 10E02 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: FIT-99406 10E04 TO: PCM-99400
2 #12 >> FIT-99406 POWER
N-1000 10E02 0.75" 1 CAT6 1 #14 XHHW-2 FR: RAD2-99400
TO: PLC-99400
1 CAT6 >> RAD2-99400 NETWORK
N-2001 10E02 0.75" 1 CAT6 1 #14 XHHW-2 FR: SWBD-RWPS
TO: PCM-99400
1 CAT6 >> SWBD-RWPS METER NETWORK
N-2011 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99411
TO: PCM-99400
1 CAT6 >> VFD-99411 NETWORK
N-2021 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99412
TO: PCM-99400
1 CAT6 >> VFD-99412 NETWORK
N-2031 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99413
TO: PCM-99400
1 CAT6 >> VFD-99413 NETWORK
N-2041 10E02 1" 1 CAT6 1 #14 XHHW-2 FR: VFD-99414
TO: PCM-99400
1 CAT6 >> VFD-99414 NETWORK
N-3100 10E02 2" 1 MFR CABLE 1 #14 XHHW-2 FR: ANT2-99400 10E04 TO: RAD2-99400
1 MFR >> ANT2-99400 NETWORK
N-5000 11E01 1" 1 CAT6 1 #14 XHHW-2 FR: RAD2-99400
TO: PLC12199
1 CAT6 >> RAD2-99400 NETWORK
N-5100 11E01 1" 1 MFR CABLE 1 #14 XHHW-2 FR: ANT2-99400 TO: RAD2-99400
1 MFR >> ANT2-99400 NETWORK
P-0001 10E01 4" 3 350 XHHW-2 1 #1 XHHW-2 FR: PNL-RWPS
TO: MCC-E
3 350 >> PNL-RWPS POWER NO. 1
P-0002 10E01 4" 3 350 XHHW-2 1 #1 XHHW-2 FR: PNL-RWPS
TO: MCC-E
3 350 >> PNL-RWPS POWER NO. 2
P-0010 10E01 4" 3 500 XHHW-2 1 #2/0 XHHW-2 FR: SWBD-RWPS 10E02 TO: PNL-RWPS (VIA HH-1, HH-2, HH-3)
3 500 >> SWBD-RWPS POWER NO. 1
P-0011 10E01 4" 3 500 XHHW-2 1 #2/0 XHHW-2 FR: SWBD-RWPS 10E02 TO: PNL-RWPS (VIA HH-1, HH-2, HH-3)
3 500 >> SWBD-RWPS POWER NO. 1
April 2023 16990-4 8660F10

Page 2423 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
P-1000 10E02 1.5" 3 #3 XHHW-2 1 #8 XHHW-2 FR: XFMR-RWPS-L TO: SWBD-RWPS
3 #3 >> XFMR-RWPS-L POWER
P-2011 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99411 P-2012 TO: DISC-99411
1 3/C-#1:VFD >> PMP-99411 POWER
P-2012 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99411 10E03 TO: VFD-99411
1 3/C-#1:VFD >> PMP-99411 POWER P-2011
P-2013 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99411 TO: SWBD-RWPS
3 #1/0 >> VFD-99411 POWER
P-2021 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99412 P-2022 TO: DISC-99412
1 3/C-#1:VFD >> PMP-99412 POWER
P-2022 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99412 10E03 TO: VFD-99412
1 3/C-#1:VFD >> PMP-99412 POWER P-2021
P-2023 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99412 TO: SWBD-RWPS
3 #1/0 >> VFD-99412 POWER
P-2031 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99413 P-2032 TO: DISC-99413
1 3/C-#1:VFD >> PMP-99413 POWER
P-2032 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99413 10E03 TO: VFD-99413
1 3/C-#1:VFD >> PMP-99413 POWER P-2031
P-2033 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99413 TO: SWBD-RWPS
3 #1/0 >> VFD-99413 POWER
P-2041 10E03 2" 1 3/C-#1:VFD VFD INTEGRAL FR: PMP-99414 P-2042 TO: DISC-99414
1 3/C-#1:VFD >> PMP-99414 POWER
P-2042 10E02 2" 1 3/C-#1:VFD VFD INTEGRAL FR: DISC-99414 10E03 TO: VFD-99414
1 3/C-#1:VFD >> PMP-99414 POWER P-2041
P-2043 10E02 1.5" 3 #1/0 XHHW-2 1 #6 XHHW-2 FR: VFD-99414 TO: SWBD-RWPS
3 #1/0 >> VFD-99414 POWER
S-2011 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99411
10E03 TO: VFD-99411
1 3/CS-#16 >> HSS-99411 SIGNAL
S-2021 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99412
10E03 TO: VFD-99412
1 3/CS-#16 >> HSS-99412 SIGNAL
S-2031 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99413
10E03 TO: VFD-99413
1 3/CS-#16 >> HSS-99413 SIGNAL
S-2041 10E02 2" 1 3/CS-#16 1 #14 XHHW-2 FR: LCP-99414
10E03 TO: VFD-99414
1 3/CS-#16 >> HSS-99414 SIGNAL
S-2429 10E03 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-99432 S-2431 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-99432 SIGNAL
S-2430 10E03 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-99431 S-2431 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-99431 SIGNAL
S-2431 10E02 2" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX 10E03 TO: PCM-99400
1 2/CS-#16 >> PIT-99432 SIGNAL S-2429
1 2/CS-#16 >> FIT-99431 SIGNAL S-2430
April 2023 16990-5 8660F10

Page 2424 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
S-3100 10E04 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-99405 S-3101 TO: DESIC-99405
1 2/CS-#16 >> LIT-99405 SIGNAL
S-3101 10E04 2" 1 2/CS-#16 1 #14 XHHW-2 FR: DESIC-99405 TO: PCM-99400 (VIA HH-4)
1 2/CS-#16 >> LIT-99405 SIGNAL S-3100
S-3102 10E02 2" 1 2/CS-#16 1 #14 XHHW-2 FR: HH-4
TO: PCM-99400
1 2/CS-#16 >> FIT-99406 SIGNAL S-3200
S-3200 10E04 2" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-99406 S-3102 TO: HH-4
1 2/CS-#16 >> FIT-99406 SIGNAL
X-0010 10E01 4" 1 PULL ROPE FR: STUB-UP BY WATER TREATMENT BUILDING 10E02 TO: STUB-UP AT RWPS ELECTRICAL BUILDING (VIA HH-1, HH-2, HH-3 1 PULL >> SPARE
X-0011 10E01 4" 1 PULL ROPE FR: STUB-UP BY WATER TREATMENT BUILDING 10E02 TO: STUB-UP AT RWPS ELECTRICAL BUILDING (VIA HH-1, HH-2, HH-3 1 PULL >> SPARE
X-1500 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-1501 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-1502 10E02 2" 1 PULL ROPE FR: HH-4
TO: STUB-UP AT RWPS ELECTRICAL BUILDING
1 PULL >> SPARE
X-2011 10E02 2" 1 PULL ROPE FR: PMP-99411
10E03 TO: VFD-99411
1 PULL >> SPARE
X-2021 10E02 2" 1 PULL ROPE FR: PMP-99412
10E03 TO: VFD-99412
1 PULL >> SPARE
X-2031 10E02 2" 1 PULL ROPE FR: PMP-99413
10E03 TO: VFD-99413
1 PULL >> SPARE
X-2041 10E02 2" 1 PULL ROPE FR: PMP-99414
10E03 TO: VFD-99414
1 PULL >> SPARE
X-2051 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2052 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2053 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2054 10E02 2" 1 PULL ROPE FR: PMP-99415
10E03 TO: VFD-99415
1 PULL >> SPARE
X-2055 10E02 2" 1 PULL ROPE FR: VFD-99415
TO: SWBD-RWPS
1 PULL >> SPARE
X-2056 10E02 2" 1 PULL ROPE FR: VFD-99415
TO: PCM-99400
1 PULL >> SPARE
X-2100 10E02 2" 1 PULL ROPE FR: STUB-UP AT PUMP STATION 10E03 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-2101 10E02 2" 1 PULL ROPE FR: STUB-UP AT PUMP STATION 10E03 TO: ELECTRICAL ROOM
1 PULL >> SPARE
April 2023 16990-6 8660F10

Page 2425 of 3073 ends

CONDUIT SCHEDULE AREA WTP RECYCLED WA ENGINEER AMM
Ukiah Recycled Water Project REVISION 0
DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
X-3100 10E02 2" 1 PULL ROPE FR: STUB-UP BY TANK
10E04 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3101 10E02 2" 1 PULL ROPE FR: STUB-UP BY TANK
10E04 TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3102 99E04 2" 1 PULL ROPE FR: STUB-UP BY CONTROL VALVE TO: HH-4
1 PULL >> SPARE
X-3103 99E04 2" 1 PULL ROPE FR: STUB-UP BY CONTROL VALVE TO: HH-4
1 PULL >> SPARE
X-3104 99E02 2" 1 PULL ROPE FR: HH-4
TO: ELECTRICAL ROOM
1 PULL >> SPARE
X-3200 10E02 2" 1 PULL ROPE FR: HH-4
TO: ELECTRICAL ROOM
1 PULL >> SPARE

END OF CONDUIT SCHEDULE

END OF SECTION
April 2023 16990-7 8660F10

Page 2426 of 3073 ends
Page 2427 of 3073 ends

PART 1 GENERAL

1.01 SUMMARY
A. Conduit requirements:

1. As defined in Section 16050 and Section 16130.

B. Cable requirements and definitions:

1. As defined in Section 16050 and Section 16123.

2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.

3. CAT6: Category 6 Ethernet cable.

4. MFR: Manufacturer or vendor furnished cable.

PART 2 PRODUCTS
Not Used.

PART 3 EXECUTION

3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.

SECTION 16990

CONDUIT SCHEDULE
AREA 85
April 2023 16990-1 8660F10

Page 2428 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-85-100 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8511 C-85-201 TO: CONDUIT TEE
10 #14 >> FV-85217 CONTROL P-85-100
8 #14 >> FCV-85218 CONTROL P-85-105
10 #14 >> FV-85219 CONTROL P-85-110
C-85-110 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSL-85101 C-85-112 TO: JUNCTION BOX
1 MFR >> LSL-85101 CONTROL
C-85-111 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSH-85101 C-85-112 TO: JUNCTION BOX
1 MFR >> LSH-85101 CONTROL
C-85-112 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-85-123 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-111
2 #14 >> LSL-85101 CONTROL C-85-110
C-85-120 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSL-85102 C-85-122 TO: JUNCTION BOX
1 MFR >> LSL-85102 CONTROL
C-85-121 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: LSH-85102 C-85-122 TO: CONDUIT TEE
1 MFR >> LSH-85102 CONTROL
C-85-122 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-123 TO: CONDUIT TEE
2 #14 >> LSH-85102 CONTROL C-85-121
2 #14 >> LSL-85102 CONTROL C-85-120
C-85-123 0.75" 8 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-133 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-112
2 #14 >> LSL-85101 CONTROL C-85-112
2 #14 >> LSH-85102 CONTROL C-85-122
2 #14 >> LSL-85102 CONTROL C-85-122
C-85-130 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSL-85103 C-85-132 TO: CONDUIT TEE
2 #14 >> LSL-85103 CONTROL
C-85-131 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSH-85103 C-85-132 TO: CONDUIT TEE
2 #14 >> LSH-85103 CONTROL
C-85-132 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-133 TO: CONDUIT TEE
2 #14 >> LSH-85103 CONTROL C-85-131
2 #14 >> LSL-85103 CONTROL C-85-130
C-85-133 1" 12 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-145 TO: CONDUIT TEE
2 #14 >> LSH-85101 CONTROL C-85-123
2 #14 >> LSL-85101 CONTROL C-85-123
2 #14 >> LSH-85102 CONTROL C-85-123
2 #14 >> LSL-85102 CONTROL C-85-123
2 #14 >> LSH-85103 CONTROL C-85-132
2 #14 >> LSL-85103 CONTROL C-85-132
C-85-140 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSL-85104 C-85-142 TO: CONDUIT TEE
2 #14 >> LSL-85104 CONTROL
C-85-141 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: LSH-85104 C-85-142 TO: CONDUIT TEE
2 #14 >> LSH-85104 CONTROL
C-85-142 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-145 TO: CONDUIT TEE
2 #14 >> LSH-85104 CONTROL C-85-141
2 #14 >> LSL-85104 CONTROL C-85-140
C-85-145 1" 16 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-402 TO: PB-8501
2 #14 >> LSH-85101 CONTROL C-85-133
2 #14 >> LSL-85101 CONTROL C-85-133
2 #14 >> LSH-85102 CONTROL C-85-133
2 #14 >> LSL-85102 CONTROL C-85-133
2 #14 >> LSH-85103 CONTROL C-85-133
2 #14 >> LSL-85103 CONTROL C-85-133
2 #14 >> LSH-85104 CONTROL C-85-142
2 #14 >> LSL-85104 CONTROL C-85-142
April 2023 16990-2 8660F10

Page 2429 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-85-150 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8521 C-85-251 TO: CONDUIT TEE
8 #14 >> FCV-85211 CONTROL
10 #14 >> FV-85212 CONTROL
10 #14 >> FV-85214 CONTROL
C-85-200 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8512 C-85-201 TO: CONDUIT TEE
10 #14 >> FV-85227 CONTROL P-85-200
8 #14 >> FCV-85228 CONTROL P-85-205
10 #14 >> FV-85229 CONTROL P-85-210
C-85-201 2" 56 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-301 TO: CONDUIT TEE
10 #14 >> FV-85217 CONTROL C-85-100
8 #14 >> FCV-85218 CONTROL C-85-100
10 #14 >> FV-85219 CONTROL C-85-100
10 #14 >> FV-85227 CONTROL C-85-200
8 #14 >> FCV-85228 CONTROL C-85-200
10 #14 >> FV-85229 CONTROL C-85-200
C-85-250 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8522 C-85-251 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL
10 #14 >> FV-85222 CONTROL
10 #14 >> FV-85224 CONTROL
C-85-251 2" 56 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-351 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL C-85-250
10 #14 >> FV-85222 CONTROL C-85-250
10 #14 >> FV-85224 CONTROL C-85-250
8 #14 >> FCV-85211 CONTROL C-85-150
10 #14 >> FV-85212 CONTROL C-85-150
10 #14 >> FV-85214 CONTROL C-85-150
C-85-300 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8513 C-85-301 TO: CONDUIT TEE
10 #14 >> FV-85239 CONTROL P-85-310
8 #14 >> FCV-85238 CONTROL P-85-305
10 #14 >> FV-85237 CONTROL P-85-300
C-85-301 2.5" 84 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-401 TO: CONDUIT TEE
10 #14 >> FV-85239 CONTROL C-85-300
8 #14 >> FCV-85238 CONTROL C-85-300
10 #14 >> FV-85237 CONTROL C-85-300
10 #14 >> FV-85217 CONTROL C-85-201
8 #14 >> FCV-85218 CONTROL C-85-201
10 #14 >> FV-85219 CONTROL C-85-201
10 #14 >> FV-85227 CONTROL C-85-201
8 #14 >> FCV-85228 CONTROL C-85-201
10 #14 >> FV-85229 CONTROL C-85-201
C-85-350 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8523 C-85-351 TO: CONDUIT TEE
8 #14 >> FCV-85231 CONTROL
10 #14 >> FV-85232 CONTROL
10 #14 >> FV-85234 CONTROL
C-85-351 2.5" 84 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-455 TO: CONDUIT TEE
8 #14 >> FCV-85221 CONTROL C-85-251
10 #14 >> FV-85222 CONTROL C-85-251
10 #14 >> FV-85224 CONTROL C-85-251
8 #14 >> FCV-85211 CONTROL C-85-251
10 #14 >> FV-85212 CONTROL C-85-251
10 #14 >> FV-85214 CONTROL C-85-251
8 #14 >> FCV-85231 CONTROL C-85-350
10 #14 >> FV-85232 CONTROL C-85-350
10 #14 >> FV-85234 CONTROL C-85-350
C-85-400 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8514 C-85-401 TO: CONDUIT TEE
10 #14 >> FV-85247 CONTROL P-85-400
8 #14 >> FCV-85248 CONTROL P-85-405
10 #14 >> FV-85249 CONTROL P-85-410
April 2023 16990-3 8660F10

Page 2430 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-85-401 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-402 TO: PB-8501
10 #14 >> FV-85247 CONTROL C-85-400
8 #14 >> FCV-85248 CONTROL C-85-400
10 #14 >> FV-85249 CONTROL C-85-400
10 #14 >> FV-85239 CONTROL C-85-301
8 #14 >> FCV-85238 CONTROL C-85-301
10 #14 >> FV-85237 CONTROL C-85-301
10 #14 >> FV-85217 CONTROL C-85-301
8 #14 >> FCV-85218 CONTROL C-85-301
10 #14 >> FV-85219 CONTROL C-85-301
10 #14 >> FV-85227 CONTROL C-85-301
8 #14 >> FCV-85228 CONTROL C-85-301
10 #14 >> FV-85229 CONTROL C-85-301
C-85-402 3" 138 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8501
TO: VCP-3
10 #14 >> FV-85247 CONTROL C-85-401
8 #14 >> FCV-85248 CONTROL C-85-401
10 #14 >> FV-85249 CONTROL C-85-401
10 #14 >> FV-85239 CONTROL C-85-401
8 #14 >> FCV-85238 CONTROL C-85-401
10 #14 >> FV-85237 CONTROL C-85-401
10 #14 >> FV-85217 CONTROL C-85-401
8 #14 >> FCV-85218 CONTROL C-85-401
10 #14 >> FV-85219 CONTROL C-85-401
10 #14 >> FV-85227 CONTROL C-85-401
8 #14 >> FCV-85228 CONTROL C-85-401
10 #14 >> FV-85229 CONTROL C-85-401
2 #14 >> LSH-85101 CONTROL C-85-145
2 #14 >> LSL-85101 CONTROL C-85-145
2 #14 >> LSH-85102 CONTROL C-85-145
2 #14 >> LSL-85102 CONTROL C-85-145
2 #14 >> LSH-85103 CONTROL C-85-145
2 #14 >> LSL-85103 CONTROL C-85-145
2 #14 >> LSH-85104 CONTROL C-85-145
2 #14 >> LSL-85104 CONTROL C-85-145
10 #14 >> FV-87130 CONTROL
C-85-450 1.5" 28 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8524 C-85-455 TO: CONDUIT TEE
8 #14 >> FCV-85241 CONTROL
10 #14 >> FV-85242 CONTROL
10 #14 >> FV-85244 CONTROL
C-85-455 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-85-457 TO: PB-8501
8 #14 >> FCV-85221 CONTROL C-85-351
10 #14 >> FV-85222 CONTROL C-85-351
10 #14 >> FV-85224 CONTROL C-85-351
8 #14 >> FCV-85211 CONTROL C-85-351
10 #14 >> FV-85212 CONTROL C-85-351
10 #14 >> FV-85214 CONTROL C-85-351
8 #14 >> FCV-85231 CONTROL C-85-351
10 #14 >> FV-85232 CONTROL C-85-351
10 #14 >> FV-85234 CONTROL C-85-351
8 #14 >> FCV-85241 CONTROL C-85-450
10 #14 >> FV-85242 CONTROL C-85-450
10 #14 >> FV-85244 CONTROL C-85-450
C-85-457 2.5" 112 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8501
TO: VCP-3
8 #14 >> FCV-85221 CONTROL C-85-455
10 #14 >> FV-85222 CONTROL C-85-455
10 #14 >> FV-85224 CONTROL C-85-455
8 #14 >> FCV-85211 CONTROL C-85-455
10 #14 >> FV-85212 CONTROL C-85-455
10 #14 >> FV-85214 CONTROL C-85-455
8 #14 >> FCV-85231 CONTROL C-85-455
10 #14 >> FV-85232 CONTROL C-85-455
10 #14 >> FV-85234 CONTROL C-85-455
8 #14 >> FCV-85241 CONTROL C-85-455
10 #14 >> FV-85242 CONTROL C-85-455
10 #14 >> FV-85244 CONTROL C-85-455
C-85-501 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85106 C-85-510 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85106 MWH
2 #14 >> BLO-85106 TSH
C-85-503 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85106 C-85-510 TO: JUNCTION BOX
4 #14 >> PDSH-85106 CONTROL
April 2023 16990-4 8660F10

Page 2431 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-85-505 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85106 C-85-510 TO: JUNCTION BOX
2 #14 >> PSH-85106 CONTROL
C-85-507 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85106 C-85-510 TO: JUNCTION BOX
6 #14 >> LCP-85106 CONTROL
C-85-510 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85106 CONTROL C-85-507
2 #14 >> PSH-85106 CONTROL C-85-505
4 #14 >> PDSH-85106 CONTROL C-85-503
2 #12 >> BLO-85106 MWH C-85-501
2 #14 >> BLO-85106 TSH C-85-501
C-85-511 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85107 C-85-520 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85107 MWH
2 #14 >> BLO-85107 TSH
C-85-513 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85107 C-85-520 TO: JUNCTION BOX
4 #14 >> PDSH-85107 CONTROL
C-85-515 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85107 C-85-520 TO: JUNCTION BOX
2 #14 >> PSH-85107 CONTROL
C-85-517 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85107 C-85-520 TO: JUNCTION BOX
6 #14 >> LCP-85107 CONTROL
C-85-520 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85107 CONTROL C-85-517
2 #14 >> PSH-85107 CONTROL C-85-515
4 #14 >> PDSH-85107 CONTROL C-85-513
2 #12 >> BLO-85107 MWH C-85-511
2 #14 >> BLO-85107 TSH C-85-511
C-85-521 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: BLO-85108 C-85-530 2 #14 XHHW-2 TO: JUNCTION BOX
2 #12 >> BLO-85108 MWH
2 #14 >> BLO-85108 TSH
C-85-523 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: PDSH-85108 C-85-530 TO: JUNCTION BOX
4 #14 >> PDSH-85108 CONTROL
C-85-525 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSH-85108 C-85-530 TO: JUNCTION BOX
2 #14 >> PSH-85108 CONTROL
C-85-527 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85108 C-85-530 TO: JUNCTION BOX
6 #14 >> LCP-85108 CONTROL
C-85-530 1" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-85-545 14 #14 XHHW-2 TO: PB-8530
6 #14 >> LCP-85108 CONTROL C-85-527
2 #14 >> PSH-85108 CONTROL C-85-525
4 #14 >> PDSH-85108 CONTROL C-85-523
2 #12 >> BLO-85108 MWH C-85-521
2 #14 >> BLO-85108 TSH C-85-521
C-85-540 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PSL-85100 C-85-542 TO: PB-8530
2 #14 >> PSL-85100 CONTROL
C-85-542 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: PB-8530
TO: VCP-3
2 #14 >> PSL-85100 CONTROL C-85-540
April 2023 16990-5 8660F10

Page 2432 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-85-545 2" 6 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8530
42 #14 XHHW-2 TO: MCC-C
6 #14 >> LCP-85108 CONTROL C-85-530
2 #14 >> PSH-85108 CONTROL C-85-530
4 #14 >> PDSH-85108 CONTROL C-85-530
2 #12 >> BLO-85108 MWH C-85-530
2 #14 >> BLO-85108 TSH C-85-530
6 #14 >> LCP-85107 CONTROL C-85-520
2 #14 >> PSH-85107 CONTROL C-85-520
4 #14 >> PDSH-85107 CONTROL C-85-520
2 #12 >> BLO-85107 MWH C-85-520
2 #14 >> BLO-85107 TSH C-85-520
6 #14 >> LCP-85106 CONTROL C-85-510
2 #14 >> PSH-85106 CONTROL C-85-510
4 #14 >> PDSH-85106 CONTROL C-85-510
2 #12 >> BLO-85106 MWH C-85-510
2 #14 >> BLO-85106 TSH C-85-510
C-85-550 1.5" 39 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: VCP-3
10 #14 >> BLO-85106 CONTROL
3 #14 >> FAN-85109 CONTROL
10 #14 >> BLO-85107 CONTROL
3 #14 >> FAN-85110 CONTROL
10 #14 >> BLO-85108 CONTROL
3 #14 >> FAN-85111 CONTROL
C-85-610 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-85104 C-85-612 TO: JUNCTION BOX
6 #14 >> LCP-85104 CONTROL
C-85-612 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX 8 #14 XHHW-2 TO: CONDUIT TEE
2 #12 >> PMP-85104 MWH P-85-610
2 #14 >> PMP-85104 TSH P-85-610
6 #14 >> LCP-85104 CONTROL C-85-610
C-85-614 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: CONDUIT TEE 2 #14 XHHW-2 TO: MCC-C
2 #12 >> PMP-85104 MWH
2 #14 >> PMP-85104 TSH
C-85-616 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE TO: PLC-4
6 #14 >> LCP-85104 CONTROL
C-85-620 0.75" 10 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: PLC-4
10 #14 >> PMP-85104 CONTROL
N-85-500 0.75" 1 CAT6 1 #14 XHHW-2 FR: VCP-3
TO: PLC-4
1 CAT6 >> VCP-3 NETWORK
N-85-510 0.75" 1 CAT6 1 #14 XHHW-2 FR: HMI WORK STATION TO: PLC-4
1 CAT6 >> HMI WORK STATION NETWORK
P-85-100 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85217 C-85-100 10 #14 XHHW-2 TO: PB-8511
3 #12 >> FV-85217 POWER
10 #14 >> FV-85217 CONTROL
P-85-101 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85217 TO: PB-8511
6 #12 >> FV-85217 POWER
P-85-105 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85218 C-85-100 8 #14 XHHW-2 TO: PB-8511
3 #12 >> FCV-85218 POWER
8 #14 >> FCV-85218 CONTROL
P-85-106 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85218 TO: PB-8511
6 #12 >> FCV-85218 POWER
P-85-110 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85219 C-85-100 10 #14 XHHW-2 TO: PB-8511
3 #12 >> FV-85219 POWER
10 #14 >> FV-85219 CONTROL
April 2023 16990-6 8660F10

Page 2433 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
P-85-111 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85219 TO: PB-8511
6 #12 >> FV-85219 POWER
P-85-120 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8511 P-85-221 TO: CONDUIT TEE
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER
P-85-150 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85211
8 #14 XHHW-2 TO: PB-8521
3 #12 >> FCV-85211 POWER
8 #14 >> FCV-85211 CONTROL
P-85-151 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85211 TO: PB-8521
6 #12 >> FCV-85241 POWER
P-85-155 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85212
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85212 POWER
10 #14 >> FV-85212 CONTROL
P-85-156 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85212 TO: PB-8521
6 #12 >> FV-85212 POWER
P-85-160 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85214
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85214 POWER
10 #14 >> FV-85214 CONTROL
P-85-161 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-85214 TO: PB-8521
6 #10 >> FV-85214 POWER
P-85-170 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8521 P-85-275 TO: CONDUIT TEE
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER
P-85-200 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85227 C-85-200 10 #14 XHHW-2 TO: PB-8512
3 #12 >> FV-85227 POWER
10 #14 >> FV-85227 CONTROL
P-85-201 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85227 TO: PB-8512
6 #12 >> FV-85227 POWER
P-85-205 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85228 C-85-200 8 #14 XHHW-2 TO: PB-8512
3 #12 >> FCV-85228 POWER
8 #14 >> FCV-85228 CONTROL
P-85-206 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85228 TO: PB-8512
6 #12 >> FCV-85228 POWER
P-85-210 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85229 C-85-200 10 #14 XHHW-2 TO: PB-8512
3 #12 >> FV-85229 POWER
10 #14 >> FV-85229 CONTROL
P-85-211 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85229 TO: PB-8512
6 #12 >> FV-85229 POWER
P-85-220 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8512 P-85-221 TO: CONDUIT TEE
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER
P-85-221 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-222 TO: PB-8501
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER P-85-120
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER P-85-220
P-85-222 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FV-85217, FCV-85218, FV-85219 POWER P-85-221
3 #10 >> FV-85227, FCV-85228, FV-85229 POWER P-85-221
April 2023 16990-7 8660F10

Page 2434 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
P-85-250 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85221
8 #14 XHHW-2 TO: PB-8522
3 #12 >> FCV-85221 POWER
8 #14 >> FCV-85221 CONTROL
P-85-251 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85221 TO: PB-8522
6 #12 >> FCV-85221 POWER
P-85-255 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85222
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85222 POWER
10 #14 >> FV-85222 CONTROL
P-85-256 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85222 TO: PB-8522
3 #12 >> FV-85222 POWER
P-85-260 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85224
10 #14 XHHW-2 TO: PB-8522
3 #12 >> FV-85224 POWER
10 #14 >> FV-85224 CONTROL
P-85-261 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85224 TO: PB-8522
6 #12 >> FV-85224 POWER
P-85-270 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8522 P-85-275 TO: CONDUIT TEE
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER
P-85-275 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-277 TO: PB-8501
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER P-85-270
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER P-85-170
P-85-277 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FCV-85221, FV-85222, FV-85224 POWER P-85-275
3 #10 >> FCV-85211, FV-85212, FV-85214 POWER P-85-275
P-85-300 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85237 C-85-300 10 #14 XHHW-2 TO: PB-8513
3 #12 >> FV-85237 POWER
10 #14 >> FV-85237 CONTROL
P-85-301 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85237 TO: PB-8513
6 #12 >> FV-85237 POWER
P-85-305 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85238 C-85-300 8 #14 XHHW-2 TO: PB-8513
3 #12 >> FCV-85238 POWER
8 #14 >> FCV-85238 CONTROL
P-85-306 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85238 TO: PB-8513
6 #12 >> FCV-85238 POWER
P-85-310 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85239 C-85-300 10 #14 XHHW-2 TO: PB-8513
3 #12 >> FV-85239 POWER
10 #14 >> FV-85239 CONTROL
P-85-311 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85239 TO: PB-8513
6 #12 >> FV-85239 POWER
P-85-320 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8513 P-85-421 TO: CONDUIT TEE
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER
P-85-350 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85231
8 #14 XHHW-2 TO: PB-8523
3 #12 >> FCV-85231 POWER
8 #14 >> FCV-85231 CONTROL
P-85-351 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85231 TO: PB-8523
6 #12 >> FCV-85231 POWER
April 2023 16990-8 8660F10

Page 2435 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
P-85-355 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85232
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85232 POWER
10 #14 >> FV-85232 CONTROL
P-85-356 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85232 TO: PB-8523
3 #12 >> FV-85232 POWER
P-85-360 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85234
10 #14 XHHW-2 TO: PB-8523
3 #12 >> FV-85234 POWER
10 #14 >> FV-85234 CONTROL
P-85-361 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85234 TO: PB-8523
6 #12 >> FV-85234 POWER
P-85-370 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8523 P-85-475 TO: CONDUIT TEE
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER
P-85-400 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85247 C-85-400 10 #14 XHHW-2 TO: PB-8514
3 #12 >> FV-85247 POWER
10 #14 >> FV-85247 CONTROL
P-85-401 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85247 TO: PB-8514
3 #12 >> FV-85247 POWER
P-85-405 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85248 C-85-400 8 #14 XHHW-2 TO: PB-8514
3 #12 >> FCV-85248 POWER
8 #14 >> FCV-85248 CONTROL
P-85-406 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85248 TO: PB-8514
6 #12 >> FCV-85248 POWER
P-85-410 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85249 C-85-400 10 #14 XHHW-2 TO: PB-8514
3 #12 >> FV-85249 POWER
10 #14 >> FV-85249 CONTROL
P-85-411 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85249 TO: PB-8514
6 #12 >> FV-85249 POWER
P-85-420 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8514 P-85-421 TO: CONDUIT TEE
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER
P-85-421 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-422 TO: PB-8501
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER P-85-420
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER P-85-320
P-85-422 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FV-85247, FCV-85248, FV-85249 POWER P-85-421
3 #10 >> FV-85237, FCV-85238, FV-85239 POWER P-85-421
P-85-450 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FCV-85241
8 #14 XHHW-2 TO: PB-8524
3 #12 >> FCV-85241 POWER
8 #14 >> FCV-85241 CONTROL
P-85-451 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85241 TO: PB-8524
6 #12 >> FCV-85241 POWER
P-85-455 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85242
10 #14 XHHW-2 TO: PB-8521
3 #12 >> FV-85242 POWER
10 #14 >> FV-85242 CONTROL
P-85-456 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85242 TO: PB-8524
3 #12 >> FV-85242 POWER
April 2023 16990-9 8660F10

Page 2436 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
P-85-460 1" 3 #12 XHHW-2 1 #12 XHHW-2 FR: FV-85244
10 #14 XHHW-2 TO: PB-8524
3 #12 >> FV-85244 POWER
10 #14 >> FV-85244 CONTROL
P-85-461 0.75" 6 #12 XHHW-2 1 #12 XHHW-2 FR: DISC-85244 TO: PB-8524
6 #12 >> FV-85244 POWER
P-85-470 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8524 P-85-475 TO: CONDUIT TEE
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER
P-85-475 0.75" 6 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-85-477 TO: PB-8501
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER P-85-370
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER P-85-470
P-85-477 1" 9 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: DP2
3 #10 >> FCV-85231, FV-85232, FV-85234 POWER P-85-475
3 #10 >> FCV-85241, FV-85242, FV-85244 POWER P-85-475
3 #10 >> FV-87130 POWER
P-85-501 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85106
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85109 POWER
3 #6 >> BLO-85106 POWER
P-85-511 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85107
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85110 POWER
3 #6 >> BLO-85107 POWER
P-85-521 1" 3 #6 XHHW-2 1 #8 XHHW-2 FR: BLO-85108
3 #12 XHHW-2 TO: MCC-C
3 #12 >> FAN-85111 POWER
3 #6 >> BLO-85108 POWER
P-85-610 0.75" 5 #12 XHHW-2 1 #12 XHHW-2 FR: PMP-85104 C-85-612 2 #14 XHHW-2 TO: JUNCTION BOX
3 #12 >> PMP-85104 POWER
2 #12 >> PMP-85104 MWH
2 #14 >> PMP-85104 TSH
P-85-612 0.75" 3 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX TO: MCC-C
3 #12 >> PMP-85104 POWER
P-85-710 1.5" 3 #2 XHHW-2 1 #8 XHHW-2 FR: DP2
TO: MCC-C
3 #2 >> DP2 POWER
S-85-100 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85211 S-85-110 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85211 SIGNAL
S-85-105 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85218 S-85-110 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85218 SIGNAL
S-85-110 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-211 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-105
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-100
S-85-150 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85211 S-85-170 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85211 SIGNAL
S-85-170 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-271 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-150
S-85-200 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85221 S-85-210 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85221 SIGNAL
S-85-205 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85228 S-85-210 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85228 SIGNAL
April 2023 16990-10 8660F10

Page 2437 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
S-85-210 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-211 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-205
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-200
S-85-211 1.5" 6 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-311 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-110
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-110
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-210
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-210
S-85-250 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85221 S-85-270 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85221 SIGNAL
S-85-270 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-271 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-250
S-85-271 1" 4 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE
TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-170
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-270
S-85-300 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85231 S-85-310 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85231 SIGNAL
S-85-305 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85238 S-85-310 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85238 SIGNAL
S-85-310 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-311 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-305
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-300
S-85-311 1.5" 9 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-411 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-211
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-211
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-211
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-211
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-310
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-310
S-85-350 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85231 S-85-370 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85231 SIGNAL
S-85-370 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-371 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-350
S-85-371 1.5" 6 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-471 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85211 SIGNAL P-85-271
2 2/CS-#16 >> FCV-85221 SIGNAL P-85-271
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-370
S-85-400 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-85241 S-85-410 TO: JUNCTION BOX
1 2/CS-#16 >> LIT-85241 SIGNAL
S-85-405 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85248 S-85-410 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85248 SIGNAL
S-85-410 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-411 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-405
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-400
April 2023 16990-11 8660F10

Page 2438 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
S-85-411 2" 12 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-415 TO: PB-8502
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-311
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-311
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-410
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-410
S-85-415 2" 12 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: VCP-3
2 2/CS-#16 >> FCV-85218 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85211 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85228 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85221 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85238 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85231 SIGNAL S-85-411
2 2/CS-#16 >> FCV-85248 SIGNAL S-85-411
1 2/CS-#16 >> LIT-85241 SIGNAL S-85-411
S-85-450 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: FCV-85241 S-85-470 TO: JUNCTION BOX
2 2/CS-#16 >> FCV-85241 SIGNAL
S-85-470 0.75" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-85-471 TO: CONDUIT TEE
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-450
S-85-471 1.5" 8 2/CS-#16 1 #14 XHHW-2 FR: CONDUIT TEE S-85-475 TO: PB-8502
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-371
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-470
S-85-475 1.5" 8 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: VCP-3
2 2/CS-#16 >> FCV-85211 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85221 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85231 SIGNAL S-85-471
2 2/CS-#16 >> FCV-85241 SIGNAL S-85-471
S-85-510 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85106 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85106 SIGNAL
S-85-520 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85107 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85107 SIGNAL
S-85-530 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: PIT-85108 S-85-540 TO: JUNCTION BOX
1 2/CS-#16 >> PIT-85108 SIGNAL
S-85-540 1" 3 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX
TO: VCP-3
1 2/CS-#16 >> PIT-85108 SIGNAL S-85-530
1 2/CS-#16 >> PIT-85107 SIGNAL S-85-520
1 2/CS-#16 >> PIT-85106 SIGNAL S-85-510
C-87-100 0.75" 6 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-87134
TO: JUNCTION BOX
6 #14 >> LCP-87134 CONTROL
C-87-101 2" 2 #12 XHHW-2 1 #12 XHHW-2 FR: JUNCTION BOX C-87-115 8 #14 XHHW-2 TO: PB-8530
2 #14 >> PMP-87134 TSH
2 #12 >> PMP-87134 MWH
6 #14 >> LCP-87134 CONTROL
C-87-105 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: VCP-87130
TO: FV-87130
1 MFR >> VCP-87130 CONTROL
C-87-110 2" 10 #14 XHHW-2 1 #14 XHHW-2 FR: FV-87130 C-87-115 TO: PB-8530
10 #14 >> FV-87130 CONTROL
April 2023 16990-12 8660F10

Page 2439 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-87-115 1.5" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8530 C-87-117 18 #14 XHHW-2 TO: PB-8501
10 #14 >> FV-87130 CONTROL C-87-110
2 #14 >> PMP-87134 TSH C-87-101
2 #12 >> PMP-87134 MWH C-87-101
6 #14 >> LCP-87134 CONTROL C-87-101
C-87-117 0.75" 2 #12 XHHW-2 1 #12 XHHW-2 FR: PB-8501
8 #14 XHHW-2 TO: MCC-C
2 #14 >> PMP-87134 TSH C-87-115
2 #12 >> PMP-87134 MWH C-87-115
6 #14 >> LCP-87134 CONTROL C-87-115
C-87-119 0.75" 10 #14 XHHW-2 1 #14 XHHW-2 FR: MCC-C
TO: PLC-4
10 #14 >> PMP-87134 CONTROL
P-87-100 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PMP-87134
2 #12 XHHW-2 TO: JUNCTION BOX
2 #14 XHHW-2 3 #10 >> PMP-87134 POWER
2 #14 >> PMP-87134 TSH
2 #12 >> PMP-87134 MWH
P-87-101 2" 3 #10 XHHW-2 1 #10 XHHW-2 FR: JUNCTION BOX P-87-115 TO: PB-8530
3 #10 >> PMP-87134 POWER
P-87-110 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-87130
TO: JUNCTION BOX
3 #10 >> FV-87130 POWER
P-87-112 2" 7 #10 XHHW-2 1 #10 XHHW-2 FR: JUNCTION BOX P-87-115 TO: PB-8530
2 #10 >> FIT-88101 POWER L-88-101
2 #10 >> FIT-88102 POWER L-88-102
3 #10 >> FV-87130 POWER P-88-100
P-87-115 1" 10 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8530
TO: PB-8501
3 #10 >> PMP-87134 POWER P-87-101
2 #10 >> FIT-88101 POWER P-87-112
2 #10 >> FIT-88102 POWER P-87-112
3 #10 >> FV-87130 POWER P-87-112
P-87-117 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: MCC-C
3 #10 >> PMP-87134 POWER
S-87-100 2" 1 2/CS-#16 1 #14 XHHW-2 FR: AIT-87130 S-88-110 TO: PB-8535
1 2/CS-#16 >> AIT-87130 SIGNAL
L-88-101 0.75" 2 #10 XHHW-2 1 #10 XHHW-2 FR: FIT-88101 P-87-112 TO: JUNCTION BOX
2 #10 >> FIT-88101 POWER
L-88-102 0.75" 2 #10 XHHW-2 1 #10 XHHW-2 FR: FIT-88102 P-87-112 TO: JUNCTION BOX
2 #10 >> FIT-88102 POWER
L-88-105 0.75" 4 #10 XHHW-2 1 #10 XHHW-2 FR: PB-8501
TO: PLC-4
2 #10 >> FIT-88101 POWER
2 #10 >> FIT-88102 POWER
S-88-101 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-88101 S-88-105 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-88101 SIGNAL
S-88-102 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: FIT-88102 S-88-105 TO: JUNCTION BOX
1 2/CS-#16 >> FIT-88102 SIGNAL
S-88-105 2" 2 2/CS-#16 1 #14 XHHW-2 FR: JUNCTION BOX S-88-110 TO: PB-8535
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-102
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-101
S-88-110 1" 3 2/CS-#16 1 #14 XHHW-2 FR: PB-8535 S-88-112 TO: PB-8502
1 2/CS-#16 >> AIT-87130 SIGNAL S-87-100
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-105
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-105
April 2023 16990-13 8660F10

Page 2440 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HADI

RECYCLE WATER PROJECT REVISION
AWT BUILDING DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
S-88-112 1" 3 2/CS-#16 1 #14 XHHW-2 FR: PB-8502
TO: PLC-4
1 2/CS-#16 >> AIT-87130 SIGNAL S-88-110
1 2/CS-#16 >> FIT-88102 SIGNAL S-88-110
1 2/CS-#16 >> FIT-88101 SIGNAL S-88-110

END OF CONDUIT SCHEDULE

END OF SECTION
April 2023 16990-14 8660F10

Page 2441 of 3073 ends

PART 1 GENERAL

1.01 SUMMARY
A. Conduit requirements:

1. As defined in Section 16050 and Section 16130.

B. Cable requirements and definitions:

1. As defined in Section 16050 and Section 16123.

2. 2/CS#16: 2 conductor, 16 gauge, twisted shielded pair.

3. 3/CS#16: 3 conductor, 16 gauge, twisted shielded triplet.

4. */C#Y: Multiconductor cable (* indicates number of
conductors, Y indicates conductor size and insulation).

5. */FO: Fiber optic (* indicates strand count).

6. CAT6: Category 6 Ethernet cable.

7. MFR: Manufacturer or vendor furnished cable.

8. PULL: Pull Rope.

9. VFD: Shielded VFD cable with integral ground.

PART 2 PRODUCTS
Not Used.

PART 3 EXECUTION

3.01 CONDUIT SCHEDULE
A. Conduit Schedule is presented on the following pages.

SECTION 16990

CONDUIT SCHEDULE
AREA WWTP Pump Stations
April 2023 16990-1 8660F10

Page 2442 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
C-60-100 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: CONDUIT TEE TO: LCP-60102
1 MFR >> LCP-60102 CONTROL P-60-100
C-60-105 0.75" 1 MFR CABLE 1 #14 XHHW-2 FR: CONDUIT TEE TO: LCP-60100
1 MFR >> LCP-60100 CONTROL P-60-105
L-60-109 0.75" 2 #14 XHHW-2 1 #14 XHHW-2 FR: NJB-60001 L-60-111 TO: PB-6001
2 #14 >> NETWORK COMM'S POWER
L-60-110 0.75" 4 #10 XHHW-2 1 #10 XHHW-2 FR: DECNLORINATION LIGHTING AND RECEPT. L-60-111 TO: PB-6001
4 #10 >> DECNLORINATION LIGHTING AND RECEPT.

L-60-111 2" 4 #10 XHHW-2 1 #10 XHHW-2 FR: PB-6001
2 #14 XHHW-2 1 #14 XHHW-2 TO: PB-8901
4 #10 >> DECNLORINATION LIGHTING AND RECEPT. L-60-110
2 #14 >> NJB-60001
N-60-100 0.75" 1 CAT6 1 #14 XHHW-2 FR: FV-60102
TO: NJB-60001
1 CAT6 >> FV-60102 NETWORK
N-60-105 1" 1 CAT6 1 #14 XHHW-2 FR: FV-60100
TO: NJB-60001
1 CAT6 >> FV-60100 NETWORK
N-60-110 2" 1 12/FO 1 #14 XHHW-2 FR: NJB-60001 N-60-111 TO: PB-8901
1 12/FO >> NJB-60001 NETWORK
N-60-111 2" 1 12/FO 1 #14 XHHW-2 FR: PB-8901 N-60-112
TO: HH-11
1 12/FO >> NJB-60001 NETWORK N-60-110
N-60-112 2" 1 12/FO 1 #14 XHHW-2 FR: HH-11 N-60-113
TO: HH-13
1 12/FO >> NJB-60001 NETWORK N-60-111
N-60-113 2" 1 12/FO 1 #14 XHHW-2 FR: HH-13 N-60-114
TO: PB-7002
1 12/FO >> NJB-60001 NETWORK N-60-112
N-60-114 2" 1 12/FO 1 #14 XHHW-2 FR: PB-7002
TO: PLC70299
1 12/FO >> NJB-60001 NETWORK N-60-113
P-60-100 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-60102 C-60-100 1 MFR TO: CONDUIT TEE
3 #10 >> FV-60102 POWER
1 MFR >> LCP-60102 CONTROL
P-60-101 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE P-60-102 TO: DISC-60102
3 #10 >> FV-60102 POWER
P-60-102 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-60102 P-60-120 TO: PB-6001
3 #10 >> FV-60102 POWER P-60-101
P-60-105 1" 3 #10 XHHW-2 1 #10 XHHW-2 FR: FV-60100 C-60-105 1 MFR CABLE TO: CONDUIT TEE
3 #10 >> FV-60100 POWER
1 MFR >> LCP-60100 CONTROL
P-60-106 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: CONDUIT TEE TO: DISC-60100
3 #10 >> FV-60100 POWER
P-60-107 0.75" 3 #10 XHHW-2 1 #10 XHHW-2 FR: DISC-60100 P-60-120 TO: PB-6001
3 #10 >> FV-60100 POWER
P-60-120 2" 6 #10 XHHW-2 1 #10 XHHW-2 FR: PB-6001 P-89-131 TO: PB-8901
3 #10 >> FV-60100 POWER P-60-107
3 #10 >> FV-60102 POWER P-60-102
X-60-100 2" 1 PULL ROPE FR: CONDUIT STUBUP-DECHLOR STRUCTURE TO: CONDUIT STUBUP-CAROUSEL PS
1 PULL >> SPARE
April 2023 16990-2 8660F10

Page 2443 of 3073 ends

CONDUIT SCHEDULE AREA ENGINEER HR
Ukiah Recycle Water Project REVISION
Waste Water Treatment Plant DATE 4/4/23

CONDUIT CONDUCTORS GROUND
NUMBER DWG SIZE # SIZE TYPE # SIZE TYPE DESCRIPTION CONNECTING

SEGMENTS
X-60-105 2" 1 PULL ROPE FR: CONDUIT STUBUP-DECHLOR STRUCTURE TO: CONDUIT STUBUP-CAROUSEL PS
1 PULL >> SPARE
N-70-100 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-91100 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-91100 NETWORK
N-70-101 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89102 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89102 NETWORK
N-70-102 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89101 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89101 NETWORK
N-70-103 0.75" 1 CAT6 1 #14 XHHW-2 FR: VFD-89100 N-70-104 TO: JUNCTION BOX
1 CAT6 >> VFD-89100 NETWORK
N-70-104 1.5" 4 CAT6 1 #14 XHHW-2 FR: JUNCTION BOX
TO: PLC70299
1 CAT6 >> VFD-89100 NETWORK N-70-103
1 CAT6 >> VFD-89101 NETWORK N-70-102
1 CAT6 >> VFD-89102 NETWORK N-70-101
1 CAT6 >> VFD-91100 NETWORK N-70-100
S-80-100 0.75" 1 2/CS-#16 1 #14 XHHW-2 FR: LIT-80100 S-80-101 TO: PB-8001
1 2/CS-#16 >> LIT-80100 SIGNAL
S-80-101 2" 1 2/CS-#16 1 #14 XHHW-2 FR: PB-8001
TO: PLC70299
1 2/CS-#16 >> LIT-80100 SIGNAL S-80-100
X-80-100 2" 1 PULL ROPE FR: PB-8001
TO: STUB UP
1 PULL >> SPARE
X-80-101 2" 1 PULL ROPE FR: PB-8001
TO: STUB UP
1 PULL >> SPARE
C-89-100 0.75" 3 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-89102 C-89-102 TO: JUNCTION BOX
3 #14 >> FSL-89102 CONTROL
C-89-101 0.75" 5 #14 XHHW-2 1 #14 XHHW-2 FR: LCP-89102 C-89-102 1 3/CS-#16 TO: JUNCTION BOX
5 #14 >> LCP-89102 CONTROL
1 3/CS-#16 >> LCP-89102 SPEED CONTROL
C-89-102 1" 8 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-89-108 1 3/CS-#16 TO: CONDUIT TEE
5 #14 >> LCP-89102 CONTROL C-89-101
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-101
3 #14 >> FSL-89102 CONTROL C-89-100
C-89-106 0.75" 2 MFR CABLE 1 #14 XHHW-2 FR: LSLL-89100/LSHH-89100 TO: JUNCTION BOX
1 MFR >> LSLL-89100 CONTROL
1 MFR >> LSHH-89100 CONTROL
C-89-107 0.75" 4 #14 XHHW-2 1 #14 XHHW-2 FR: JUNCTION BOX C-89-108 TO: CONDUIT TEE
2 #14 >> LSLL-89100 CONTROL
2 #14 >> LSHH-89100 CONTROL
C-89-108 1" 12 #14 XHHW-2 1 #14 XHHW-2 FR: CONDUIT TEE C-89-113 1 3/CS-#16 TO: JUNCTION BOX
2 #14 >> LSLL-89100 CONTROL C-89-107
2 #14 >> LSHH-89100 CONTROL C-89-107
5 #14 >> LCP-89102 CONTROL C-89-102
1 3/CS-#16 >> LCP-89102 SPEED CONTROL C-89-102
3 #14 >> FSL-89102 CONTROL C-89-102
C-89-110 0.75" 3 #14 XHHW-2 1 #14 XHHW-2 FR: FSL-89101 C-89-113 TO: JUNCTION BOX
3 #14 >> FSL-89101 CONTROL
April 2023 16990-3 8660F10

Page 2444 of 3073 ends