Cities Index.
Agenda packet

Ukiah City Council
June 21, 2023

Document
Agenda packet
Meeting
June 21, 2023
Body
Ukiah City Council
Pages
3,073
Original file
264.6 MB
Text extracted from the city's file for reading and search. Open the original on ukiahca.api.civicclerk.com. That file is the official record.

120
121 122
123
124
125
126
127
128
129
130 131
132
133
134
135
137 136 138
139
140
141 142
143
144
145
146
147
148
149 150
151
152
153
154
155
156
157
158
159
160 161
162
163
164
165
166 167 168
169
170
171
172
173
174
175
176
177
178
179
2519
2520
2521
2556
2557
2559
6069
6127

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

BENCHMARK INFORMATION
HPGN- D CA 01 CG
THE STATION IS LOCATED ON U.S. HIGHWAY 101, ABOUT 9 MI (14.5 KM) NORTH OF HOPLAND AND ABOUT 4 MI (6.4 KM) SOUTH OF UKIAH. TO REACH THE STATION FROM THE COUNTY

COURTHOUSE AT THE CORNER OF NORTH STATE STREET AND PERKINS STREET IN UKIAH, GO EAST ON PERKINS STREET FOR 0.52 MI (0.84 KM) TO THE SOUTHBOUND ENTRANCE TO HIGHWAY 101. GO SOUTH ON THE ON RAMP AND ALONG HIGHWAY 101 FOR 3.74 MI (6.02 KM) TO THE COX-SCHRADER ROAD EXIT TO THE RIGHT. PROCEED ALONG THE OFF RAMP FOR 0.14 MI (0.23 KM) TO THE SOUTH SIDE
OF ROBINSON OVERCROSSING(BRIDGE NO. 10-86) AND THE STATION ON THE LEFT AT POST MILE 20.70. THE STATION IS A SURVEY DISK ENCASED IN PVC PIPE WITH ACCESS COVER SET IN CONCRETE FLUSH WITH THE GROUND, 43 FT (13.1 M) SOUTHWEST OF THE WEST END OF THE SOUTH RAIL OF THE OVERCROSSING, 40 FT (12.2 M) SOUTH OF THE EXTENDED CENTERLINE OF THE BRIDGE, 15 FT (4.6 M) EAST OF THE CENTERLINE OF THE RAMP, 12.6 FT (3.8 M) SOUTH OF A FREEWAY ENTRANCE SIGN, 3.7 FT (1.1 M) EAST OF THE BACK OF THE EAST RAMP CURB AND 3.0 FT (0.9 M) NORTHEAST OF A WITNESS

HPGN- UKIAH AIRPORT RESET

THE STATION IS LOCATED AT THE NORTH END OF UKIAH MUNI AIRPORT NEAR THE RUNWAY END OF 15. THE STATION IS 141.8 FT (43.2 M) EAST OF THE AIRPORT PERIMETER FENCE, 93.8 FT (28.6 M) NORTHWEST OF RM NO 3, 88.6 FT (27.0 M) WEST OF THE WESTERLY EDGE OF THE TAXIWAY, 2.0 FT (0.6 M) EAST OF A 4 INCH X 4 INCH WOODEN WITNESS POST, AND 2.9 FT (0.9 M) WEST OF A 4 INCH X 4 INCH WOODEN WITNESS POST. THE STATION IS USCGS TRIANGULATION DISK SET IN THE TOP OF A SQUARE 10 INCH CONCRETE MONUMENT SET FLUSH WITH THE GROUND AND STAMPED UKIAH AIRPORT 1949 1963.

NOTES:

1. BEARINGS AND DISTANCES ARE IN GRID.

2. HORIZONTAL DATUM-BETWEEN FOUND HPGN POINTS DESIGNATED AS UKIAH AIRPORT RESET AND HPGN D CA 01 CG. USE COMBINED SCALE FACTOR 0.99988998 WITH EPOCH DATE 2007.00. USE RECIPROCAL 1.000110032 TO ACHIEVE GROUND DISTANCES.

3. VERTICAL DATUM BASED ON NGS BENCH MARK DESIGNATES AS UKIAH RESET NAVD 1988=622.50.
0 200' 400' 800'
SCALE: 1" = 400'
PROJECT NO.

LAST SAVED BY:

FILE NAME:

RAF
BWH
JM
00G05
5 GENERAL

KEY MAP AND SURVEY CONTROL
8660F1000G05.dwg
JDiDonato
8660F10
4/7/2023 9:18:48 AM Plot Date:

BRUSH ST
ORR ST

MAZZONI ST

STATE ST
OAK ST
ELM ST

PINE ST

PINE ST

BUSH ST

ARLINGTON DR

BUSH ST

HAZEL AVE

JACKSON AVE

MAPLE AVE

LIVE OAK AVE

CYPRESS AVE

LIVE OAK AVE

PARK WEST BLVD

PARK BLVD

DORA AVE

GROVE AVE

WALNUT AVE

MAPLE AVE

DESPINA DR

LOW GAP RD
99C01
99C03 99C02
99C04
99C05
99C06
99C07
99C08 99C09
99C11
99C10
99C12
99C13

NW PACIFIC RR
HWY 101

LOCKWOOD DR
99C14
99C15
99C16
99C17
99C18
99C01
99C02
99C04

COORDINATE CONTROL POINTS
POINT
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146

NORTHING
2186273.10
2186604.62
2186614.67
2186249.07
2186329.69
2186286.37
2186306.03
2186262.01
2186311.62
2183327.36
2183716.20
2183694.79
2184068.01
2184477.78
2184572.39
2183962.57
2185102.81
2185149.26
2185135.90
2185773.44
2186640.16
2184256.33
2184282.15
2184130.30
2184340.66
2184883.23
2185455.14

EASTING
6222121.03
6222286.89
6223021.90
6223015.03
6221748.07
6221243.05
6220346.09
6219806.65
6219323.79
6215308.64
6215652.09
6216322.36
6215978.88
6215680.93
6215178.59
6215258.81
6215665.34
6215417.92
6215495.28
6215540.54
6215142.70
6217140.87
6217278.95
6216661.28
6217769.55
6217714.30
6217581.19

ELEVATION
599.64
599.97
600.50
598.84
602.82
604.44
610.66
613.91
612.71
712.37
702.50
686.74
692.43
692.61
697.58
706.54
682.28
678.24
677.28
675.16
652.07
660.55
652.58
675.77
635.81
630.93
633.86

DESCRIPTION
CP 120 60D
CP 121 60D
CP 122 60D
CP 123 60D
CP 124 60D
CP 125 PKF
CP 126 PKW
CP 127 60D
CP 128 PKW
CP 129 60D
CP 130 PKW
CP 131 PKW
CP 132 PKW
CP 133 PKW
CP 134 60D
CP 135 60D
CP 136 PKW
CP 137 PKW
CP 138 PKF AP
CP 139 60D
CP 140 PKW
TIE CP 141 FPKW
CP 142 PKW
CP 143 PKW
CP 144 PKW
CP 145 PKW
CP 146 PKW

COORDINATE CONTROL POINTS
POINT
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173

NORTHING
2185582.70
2186205.83
2186015.29
2185990.55
2186522.64
2186576.02
2186779.83
2186907.70
2187071.49
2187199.12
2187452.61
2187953.07
2186997.49
2187492.33
2187513.35
2187383.52
2186866.10
2186352.24
2185785.25
2186268.81
2186293.09
2186261.10
2186320.92
2185766.95
2185581.81
2185909.00
2186001.86

EASTING
6216735.01
6216178.85
6216868.82
6217508.22
6217361.06
6217062.14
6216555.70
6216072.56
6215691.59
6215265.36
6215294.34
6215276.17
6217328.08
6217237.81
6217579.43
6217575.79
6217708.31
6217715.66
6217835.64
6218015.44
6218348.60
6218847.50
6221769.30
6217021.76
6216402.66
6216572.62
6216102.39

ELEVATION
637.69
642.98
641.52
643.03
651.77
651.10
654.25
665.99
669.30
672.19
682.06
687.26
654.88
656.12
652.19
653.35
651.24
649.37
643.75
645.15
642.47
633.25
603.48
636.16
640.94
638.64
642.29

DESCRIPTION
CP 147 PKW
CP 148 PKW
CP 149 60D
CP 150 PKW
CP 151 PKW
CP 152 PKW
CP 153 PKW
CP 154 PKW
CP 155 PKW
CP 156 PKW
CP 157 PKW
CP 158 PKW
CP 159 PKW
CP 160 PKW
CP 161 PKW
CP 162 PKW
CP 163 PKWF
CP 164 PKW
CP 165 PKW
CP 166 PKW
CP 167 PKW
CP 168 60D
CP 169 PKWF
CP 170 60D
CP 171 60D
CP 172 60D
CP 173 60D

COORDINATE CONTROL POINTS
POINT
174
175
176
177
178
179
2519
2520
2521
2556
2557
2559
6069
6127

NORTHING
2186332.40
2186550.16
2186158.94
2186240.06
2186177.67
2186440.43
2184458.25
2185482.63
2185905.30
2186364.23
2186795.27
2186701.16
2185810.49
2185853.44

EASTING
6215393.80
6221800.38
6221865.69
6221917.16
6221994.34
6221969.32
6223436.69
6223449.79
6223282.95
6222029.71
6221946.48
6221928.30
6217362.82
6217482.31

ELEVATION
648.18
602.92
604.16
604.76
605.85
607.84
596.52
598.36
598.88
600.72
601.43
604.87
639.90
639.56

DESCRIPTION
CP 174 60D
CP 175 60D
CP 176 60D
CP 177 60D
CP 178 60D
CP 179 PKW
SET 1/2" IP
SET 1/2
SET 1/2
60d N&S_SET
HIGHWAY MONUMENT_FOUND
HPGN
111
109
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:19:58-07'00'

Page 430 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023 12:07:31
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:
6 GENERAL
8660F10

RECYCLED WATER SERVICE

SCHEDULE
CA
CE
JM
8660F1000G06.dgn
00G06
JG
arretty

METER ID

SERVICE LINE

SIZE (INCHES)

METER SIZE
(INCHES)

CUSTOMER APN STATION
METER BOX 1 METER BOX 2 METER BOX 3
TYP. SIZE LID LABEL TYP. SIZE LID LABEL TYP. SIZE LID LABEL 401 2.0 2 Vinewood Park 145001 B24+13 2.0'' METER 2.0'' PRV & Check - N/A 402 2.0 2 Frank Zeek Elementary School 143026, 102066 B19+70 2.0'' METER 2.0'' PRV & Check - N/A 403 3.0 2 Russian River Cemetery 102050, 102049 A70+68 2.0'' METER 2.0'' PRV & Check - N/A 404 8.0 4 Russian River Cemetery 102063 A87+86 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 405 8.0 4 Ukiah High School 102061, 102060, 102074 A89+50 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 406 3.0 2 Pomolita Middle School 108111 C16+50 2.0'' METER 2.0'' PRV & Check - N/A 407 3.0 3 Pomolita Middle School 105011, 108105 C24+80 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 408 6.0 3 City Golf Course (B9) 102078 C39+30 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 409 6.0 3 City Golf Course (B9) 102078 C46+35 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 410 6.0 4 City Golf Course (F9) 103001, 109001 C57+00 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 411 3.0 3 Todd Grove Park 109002, 114101 C57+30 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 412 3.0 2 Anton Stadium (City Park) 113028, 116005, 117101 C68+68 2.0'' METER 2.0'' PRV & Check - N/A 413 1.5 1.5 Anton Stadium (City Park) 116005 C70+40 1.5'' METER 1.5'' PRV & Check - N/A Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:20:15-07'00'

Page 431 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 06-APR
-2023 10:24:06
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00G07
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EY
JBB
7 GENERAL
8660F10 8660F1000G07.dgn

DESIGN CRITERIA PIPE SERVICE ABBREVIATIONS PROCESS AREA NUMBERS

DESIGN CRITERIA, PIPE SERVICE ABBREVIATIONS

AND PROCESS AREA NUMBERS

UNITS VALUE

RECYCLED WATER PUMP STATION
QUANTITY EA 4
DUTY - 3 DUTY + 1 STANDBY

TYPE OF PUMPS - SPLIT CASE CENTRIFUGAL
CAPACITY, EA GPM 1,000
TOTAL DYNAMIC HEAD FT 240

DRIVER TYPE - VFD
MOTOR HORSEPOWER, EA HP 100

RECYCLED WATER STORAGE TANK
TOTAL CAPACITY MG 1.5
DIAMETER FT 120
FLOOR ELEVATION FT 595.08
TOP OPERATIONAL WATER LEVEL FT 620.00
OVERFLOW LEVEL FT 620.00

RECYCLED WATER PIPELINES
RESIDUAL PRESSURE AT SERVICE PSI 50

WASTEWATER TREATMENT PLANT FLOW CONDITIONS
AVERAGE DRY WEATHER (ADWF) MGD 3.01
PEAK WEEK DRY WEATHER (PWDWF) MGD 3.40
AVERAGE WET WEATHER (AWWF) MGD 6.89
PEAK WEEK WET WEATHER (PWWWF) MGD 15.8
PEAK HOUR WET WEATHER (PHWWF) MGD 24.5

COAGULANT FEED SYSTEM

COAGULANT - FERRIC CHLORIDE
CONCENTRATION % BY WT 40

PUMP TYPE - DIAPHRAGM
QUANTITY (EXISTING/NEW) EA 2 / 1
CAPACITY, EA GPH 34.2 (E) / 20.4 (E) / 20.4 (N)
MINIMUM DOSAGE mg/L 20
MAXIMUM DOSAGE mg/L 50
MOTOR HORSEPOWER, EA HP 0.5 (E) / 0.5 (E) / 0.5 (N)

ADVANCED WATER TREATMENT (AWT) CLARIFIER/FILTER SYSTEM

AWT CLARIFIER/FILTER UNITS
QUANTITY (EXISTING) EA 4
MINIMUM CAPACITY, EA MGD 1.2
MAXIMUM CAPACITY, EA MGD 2
LENGTH FT 40
WIDTH FT 12
HEIGHT FT 10

CLARIFIER
MINIMUM LOADING, EA GPM/SF 6
MAXIMUM LOADING, EA GPM/SF 10
MEDIA DEPTH IN 48
MEDIA EFFECTIVE SIZE MM 1.5-3
AVERAGE RUN TIME HRS 4
FILTER
MINIMUM LOADING, EA GPM/SF 3
MAXIMUM LOADING, EA GPM/SF 5
MEDIA DEPTH IN 30
BACKWASH GPM/SF 15

AIR WASH BLOWERS

TYPE - POSITIVE DISPLACEMENT
QUANTITY (NEW) EA 3
CAPACITY, EA SCFM 447
MOTOR HORSEPOWER, EA HP 20

PRODUCTION AUGMENTATION UNIT (PAU)
QUANTITY EA 1
CAPACITY, EA MG 5

CAROUSEL PUMP STATION

PUMP TYPE - VERTICAL TURBINE
QUANTITY (EXISTING/NEW) EA 2 / 1
CAPACITY, EA GPM 4000
MOTOR HORSEPOWER, EA HP 40

PAU PUMP STATION

PUMP TYPE - VERTICAL TURBINE
QUANTITY (NEW) EA 1
CAPACITY, EA GPM 1750
MOTOR HORSEPOWER, EA HP 20

PROCESS STREAMS
1W POTABLE WATER
2W NON-POTABLE CITY WATER
3W NO. 3 SPRAY WATER

AA AERATION AIR/AIR WASH

BA BACKWASH AIR

BW BACKWASH WATER

CCI CHLORINE LIQUID

COAG COAGULANT

CLS CHLORINE SOLUTION

CS CIRCULATING SLUDGE

CSO CAUSTIC SODA

D DRAIN

DS DIGESTED SLUDGE

DW DOMESTIC CITY WATER

F FLOAT

FC FERRIC CHLORIDE

FE FINAL EFFLUENT

FM FORCE MAIN

FW FILTERED WATER

HOCL SODIUM HYPOCHLORITE

IA INSTRUMENT AIR

LSG LOW PRESSURE SLUDGE GAS

OF OVERFLOW

PE PRIMARY EFFLUENT

POLY POLYMER

RCW RECLAIMED WATER

RW RECYCLED WATER

SA SERVICE AIR

SBIS SODIUM BISULFITE

SAM SAMPLE

SE SECONDARY EFFLUENT

SH SODIUM HYDROXIDE

SL SLUDGE

STD STORM DRAIN

SW SURFACE WASH

TD TANK DRAIN

THS THICKENED SLUDGE
V VENT

W WATER

WW WASH WATER

AREA DESCRIPTION
00 GENERAL
00 TYPICAL DETAILS
00 SYMBOLS AND ABBREVIATIONS
01 SITE PLAN
02 ELECTRICAL DUCTBANK SECTIONS
02 I&C CONTROL PANELS & NETWORK RACKS
03 ELECTRICAL ONE-LINE DIAGRAMS
03 I&C SCADA BLOCK DIAGRAMS
04 ELECTRICAL SCHEDULES
04 I&C BLOCK DIAGRAMS
05 ELECTRICAL MISC. SCHEDULES
05 I&C FIBER PINOUTS
05 TITLE 24 COMPLIANCE SHEETS
06 I&C CONTROL SCHEMATICS
09 I&C TABLES
60 DECHLORINATION STRUCTURE
75 DIGESTER
80 FILTER FEED PUMP STATION
85 ADVANCED WASTEWATER TREATMENT (AWT)
85 AWT CLARIFIER/FILTER UNITS
87 BACKWASH PUMP STATION
89 CAROUSEL PUMP STATION
91 PAU PUMP STATION
91 PLAN AND PROFILE FOR PAU PIPING
99 METER AND CONTROL VALVE
99 ELECTRICAL BUILDING
99 PLAN AND PROFILE ALIGNMENTS A, B, C
99 RECYCLED WATER PUMP STATION
99 RECYCLED WATER DISTRIBUTION TANK
eparker
JD
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:50:30-04'00'

Page 432 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 10:23:40
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00G08
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EY
JBB
8 GENERAL
8660F10 8660F1000G08.dgn
PUMPS (3)

HYPOCHLORITE
SODIUM

FILTERS
HOCL
TANKS (2)

STORAGE

HYPOCHLORITE
SODIUM
RCW
SEGMENT 1
PIPECONTACTOR

CHLORINE
SEGMENT 2
PIPECONTACTOR

CHLORINE
HO
C
L
PE
M
SE
FE
FC

STORAGE

CHLORIDE
FERRIC
TOTE

POLYMER
W W
NC
FE
NO
PONDS

EVAPORATION/PERCOLATION

FACILITY

DECHLORINATION
SE

TO RUSSIAN RIVER
NO
STORAGE (2)

RECLAIMED WATER
RCW
(2)

STORAGE
FILTER
RCW
BW
FE
PUMPS (2)

BACKWASH

STATION

BACKWASH PUMPING
HOCL
(2)
BASINS

CHLORINE CONTACT
W W
FEED PUMP (2)

BISULFITE
SODIUM
W W
WW
TANKS

STORAGE

BISULFITE
SODIUM
WW
FC
W W
SYSTEM

DISTRIBUTION
WATER

RECLAIMED
TO

MAIN WASTEWATER FLOW

MAIN SOILS FLOW

SIDE STREAM (RECYCLE)

AUXILIARY FLOW
LEGEND

CLARIFIERS

SECONDARY
FROM

CLARIFIERS

SECONDARY
FROM

TO DAFTS

CHANNEL

TANK INFLUENT

GRIT REMOVAL

TO PREAERATION

LIQUIDS PROCESS FLOW DIAGRAM

EXISTING MAIN WASTEWATER FLOW

EXISTING MAIN SOILS FLOW

EXISTING SIDE STREAM (RECYCLE)

EXISTING AUXILIARY FLOW
TRANSFER PUMPS (4)

POLYMER
M
tum
adhay
PUMPS (3)
WATER

RECLAIMED

PUMP STATION

RECLAIMED WATER

STATION
PUMP

CAROUSEL
PUMP (1)
PAU
(PAU)

AUGMENTATION UNIT

PRODUCTION
POND
SOUTH
POND
MIDDLE
POND
NORTH
AWT PUMPS (3)
WELL
WET
AWT

STATION
PUMP

FILTER FEED

CHLORINATION FACILITY

STATION

AWT PUMP

STATION

PAU PUMP
UNITS (4)

CLARIFIER/FILTER
AWT
PUMPS (3)

FILTER FEED
STRUCTURE 80
M
SYSTEM

DISTRIBUTION
WATER

TO RECYCLED
STORAGE PONDS (3)

RECYCLED WATER

STRUCTURE

FLOW DIVERSION
PUMPS (3)

COAGULANT FEED
PUMPS (4)

RECYCLED WATER
FE
JD
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:50:36-04'00'

Page 433 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 84405
Plot Date: 4/6/2023 10:39:57 AM PROJECT NO. LAST SAVED BY: FILE NAME:

EYY
AL/ART
JD
00G09 9

GENERAL

SITE PLAN
8660F1000G09.dwg kjackson 8660F10

BCDEA PRODUCTION AUGMENTATION UNIT (PAU) F DAFT EQUIPMENT BUILDING G DISINFECTION CHEMICAL STORAGE FACILITIES

CAROUSEL PUMP STATION

CHLORINE CONTACT BASINS

DECHLORINATION STRUCTURE
HIJ

AWT FACILITY

CHLORINATION FACILITY
K

DISSOLVED AIR FLOTATION THICKENERS

SLUDGE DRYING BED

DIGESTER

L SLUDGE DEWATERING FACILITY MNO

STORM DRAIN PUMP STATION

BACKWASH PUMP STATION
P

PRIMARY CLARIFIERS

MAINTENANCE BUILDING

Q MECHANICAL EQUIPMENT BUILDING R SOLIDS CONTACT TANKS STU

TRICKLING FILTER

SECONDARY CLARIFIERS
V

WASHWATER RECOVERY POND

POWER GENERATION BUILDING
WXYZ

PERCOLATION PONDS

AWT PUMP STATION

RECLAIMED WATER FILTERS

RECYCLED WATER STORAGE PONDS
AA

PRE-AERATION GRIT REMOVAL TANK & EQUIPMENT

AERATION BLOWER BUILDING

PAU PUMP STATIONS

TRICKLING FILTER PUMP STATION
AB
AC
AD

PROJECT STAGING AREA

VEHICLE AND PEDESTRIAN ACCESS
(NOT AVAILABLE TO CONTRACTOR)

1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#

1. PAU INLET.

2. TRUCK FILL HYDRANT (PHASE 3) TO BE REMOVED
AND REPLACED DURING POND CONSTRUCTION.

3. PAU PUMP STATION INLET.

GENERAL NOTES:

KEY NOTES:

LEGEND:

STRUCTURES:
3 2
1 I Y
Z
H
G
FE
D
N
M
AD
A
XXX
C
B
J
U
U
V AB
O
Q
AA
S
R
AC
S
T
T
K
K
L
P
W
SCALE
0 30' 60' 120'
SCALE: 1" = 60'
Know what's below.

Callbefore you dig.

FILE:

PLAN
8660F10C04
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:50:41-04'00'

Page 434 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 84405
PlotDate: 06-APR-2023 11:17:20AM User:svcPW Model:Layout1 ColorTable:gshade.ctb DesignScript:Carollo_Std_Pen_v0905.pen PlotScale:1:1 00D01
LASTSAVED BY:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1000D001.dgn

A NO SCALE

SITE PLAN
R
NOPQRS

BACKWASH PUMP STATION

PRIMARY CLARIFIERS

MAINTENANCE BUILDING

MECHANICAL EQUIPMENT BUILDING

SOLIDS CONTACT TANKS

TRICKLING FILTER

TUV POWER GENERATION BUILDING

WASHWATER RECOVERY POND

SECONDARY CLARIFIER
S
S
TT
V
U
U
Q
O
K
K
L
P
MD
EF
G
C
B
H
I
J
EYY
EXISTING STRUCTURES: ABDEC

SLUDGE LAGOONS

CAROUSEL PUMP STATION

DECHLORINATION STRUCTURE

CHLORINE CONTACT BASINS

DISSOLVED AIR FLOTATION THICKENERS

F DAFT EQUIPMENT BUILDING G DISINFECTION CHEMICAL STORAGE FACILITIES H AWT FACILITY I CHLORINATION FACILITY J SLUDGE DRYING BED K DIGESTER L SLUDGE DEWATERING FACILITY M STORM DRAIN PUMP STATION A
N
Y
XXX
W
WXY

RECYCLED WATER STORAGE PONDS

PERCOLATION PONDS

AWT PUMP STATION
8660F1000D01A
GENERAL NOTES:

PANEL UNLESS OTHERWISE NOTED.

BETWEEN EQUIPMENT AND ITS ASSOCIATED MCC OR CONTROL

REPLACED, DEMOLISH ALL ASSOCIATED CONDUITS AND WIRE

ELECTRICAL AND CONTROL CONDUITS AND WIRES BEING

15. FOR EQUIPMENT BEING DEMOLISHED OR HAVING ITS
DIAMETER AND HEAVILY COMPACT EACH LAYER.

HOLES IN LAYERS WITH THICKNESS NOT EXCEEDING TIE HOLE
SPECIFICATION SECTION 03600. PLACE DRY-PACK MORTAR IN

CONDUIT PENETRATION WITH DRY-PACK MORTAR PER
CONDUITS. GRIND ABANDONED CONDUITS DOWN AND FILL

14. REMOVE CABLES FROM ABANDONED IN-SLAB OR BURIED
RECEPTACLES.

PROTECT EXISTING CONDUITS TO SWITCHES, LIGHTS, AND

13. PROTECT EXISTING RECEPTACLES AND LIGHT SWITCHES.

MCC OR CONTROL PANEL.

BETWEEN THE DEMOLISHED EQUIPMENT AND ITS ASSOCIATED

12. DISCONNECT AND DEMOLISH POWER AND CONTROL WIRING
THAT EQUIPMENT OR PIPE SHALL ALSO REMOVED.

DEMOLISHED OR REMOVED, THE ASSOCIATED SUPPORTS FOR

11. WHERE ANY EQUIPMENT OR PIPING IS CALLED OUT TO BE
SURFACE. PATCH HOLE WITH NON-SHRINK GROUT.

REMOVED, FASTENER SHALL BE CUT OFF 1-INCH BELOW

BRACKETS, PIPE SUPPORTS, BASE PLATES, CLAMPS, ETC ARE

10. UNLESS OTHERWISE INDICATED, WHERE EQUIPMENT,
FACILITIES AS NECESSARY.

REROUTE EARTHEN SWALES AND PROVIDE TEMPORARY
MAINTAIN SITE DRAINAGE PATTERNS DURING CONSTRUCTION.

9. SITE DEMOLITION WILL IMPACT EXISTING DRAINAGE PATTERNS.

DEMOLITION.

CONSTRUCTION THAT IS DAMAGED AS A RESULT OF

8. RESTORE TO ITS PRECONSTRUCTION CONDITION ANY EXISTING THOSE SHOWN ON THE DRAWINGS.

III. CONDITIONS OR DETAILS DIFFERENT FROM
AND COMPONENTS.

II. DAMAGE OR DETERIORATION TO MATERIALS
FROM THE CONTRACT DOCUMENTS.

I. SIZES OR DIMENSIONS DIFFERING
CONSTRUCTION INCLUDING BUT NOT LIMITED TO:

COVERED BY THESE DRAWINGS ARE EXPOSED DURING
b. NOTIFY ENGINEER IMMEDIATELY IF CONDITIONS NOT
SHOP DRAWING PREPARATION, AND FABRICATION.

CONDITIONS RELATED TO WORK PRIOR TO DEMOLITION,
a.FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS, AND

7. EXISTING CONDITIONS:

RESTRICTIONS PRIOR TO DEMOLITION.

6. REFER TO SPECIFICATION SECTION 01140 FOR WORK

5. SALVAGE EQUIPMENT PER SPECIFICATION SECTION 01738.

REQUIREMENTS OF THE CONTRACT DOCUMENTS.

4. COORDINATE DEMOLITION WORK WITH ALL APPLICABLE
BELOW GRADE PIPING DEMOLITION.

REQUIRED. SEE YARD PIPING DRAWINGS FOR ADDITIONAL

CONTRACT DRAWINGS FOR ADDITIONAL DEMOLITION WORK
SHOWN ON THE DEMOLITION DRAWINGS. SEE OTHER

3. NOT ALL DEMOLITION WORK REQUIRED ON THIS PROJECT IS
AVAILABLE FROM OWNER FOR CONTRACTOR'S REFERENCE.

SATISFY THEMSELVES PER NOTE 1. ORIGINAL DRAWINGS ARE

CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS TO
PERFORMED AND MAJOR DEVIATIONS HAVE BEEN NOTED.

BE DEMOLISHED. WHERE POSSIBLE, A FIELD VERIFICATION WAS

SCANNING DESIGN DRAWINGS OF THE EXISTING ELEMENT(S) TO

2. THE DEMOLITION DRAWINGS HEREIN HAVE BEEN PRODUCED BY DRAWINGS AVAILABLE FROM THE CITY.

CONTRACTOR IS CAUTIONED TO REVIEW EXISTING REFERENCE
DRAWINGS SHALL BE AT THE CONTRACTOR'S DISCRETION. THE
THEMSELVES AS TO THE FIELD CONDITIONS. THE USE OF THESE

FIELD INVESTIGATIONS AS NECESSARY TO SATISFY
DEMOLITION REQUIRED. THE CONTRACTOR SHALL MAKE SUCH

CONTRACTOR FOR REFERENCE IN DETERMINING THE SCOPE OF

1. THE DEMOLITION DRAWINGS HEREIN ARE PROVIDED TO THE
A
60D01
A
89D01
A
87D01
A
85D01
eparker
A
91D01
JD
10 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:55:49-04'00'

Page 435 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:10
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60D01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1060D001.dgn
A
2 1
#
GENERAL NOTES:

KEY NOTES:

1. REFER TO GENERAL NOTES ON 00D01.

EYY

DECHLORINATION STRUCTURE
1 2
1 2
EX-24" FE
3/8" = 1'-0"

TO RUSSIAN RIVER
8660F1060M9101
EX-42" FE

FACILITY

CHLORINATION
FROM
EX-24" FE
EX-2" SO2
EX-42" FE
EX-42" FE
3 60D02
PLAN

PUMP STATION

TO CAROUSEL
60D02
60D02
CONDUITS AND LABEL THEM AS SPARE.

DISCONNECT SWITCHES. CAP EXISTING UNDERGROUND

CONDUITS, AND EQUIPMENT STANDS ASSOCIATED WITH

3. DEMOLISH EXISTING DISCONNECTS, EXPOSED

2. INSTALLING NEW VALVE.

NOTIFY ENGINEER OF ANY DEVIATIONS PRIOR TO

TO FIELD VERIFY SIZE AND MATERIAL OF PIPE AND

1. DEMOLISH VALVE. CRITICAL DIMENSION: CONTRACTOR
eparker
3 (STP)
(STP)

CONTACT BASINS

CHLORINE
FROM
JD
11 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:55:54-04'00'

Page 436 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:38
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60D02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1060D002.dgn
#
GENERAL NOTES:

KEY NOTES:
1 1. REFER TO GENERAL NOTES ON 00D01.
1 EYY
2 2
1 2
tum
adhay
PHOTOS

DECHLORINATION STRUCTURE
3 60D01 60D01
60D01
8660F1060D002A 8660F1060D002C
8660F1060D002B
3 3. DEMOLISH CHLORINE ANALYZER 4.

2. 1. DEMOLISH VALVE.

JD
12 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:00-04'00'

Page 437 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405 85D01
BAC

DEMOLITION
8660F10 8660F1085D001.dgn
A 3/16"=1'-0"
8660F085D01.jpg
2 85D02
1 1
1 1
1 1 1 1 1
85D03
85D02
1 85D03
3 EYY
4 7
8 8
8 5 5 5
85D02
6 7
7 7
5 9
8 8
P
lotD
ate: 06-APR
-2023 11:19:41
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

GENERAL NOTES:

KEY NOTES:
2 5
B
4 1
3 85D02

AWT CLARIFIER/FILTER PLAN
85D03
6 9
eparker
10 FILTER NO. 4 FILTER NO. 3 FILTER NO. 1
FILTER NO. 2
NO. 3

CLARIFIER
NO. 4

CLARIFIER
NO. 2

CLARIFIER
NO. 1

CLARIFIER

1. REFER TO GENERAL NOTES ON 00D01.
#
12 11
85D03
7 13
13 JD
13 14
14 WALL.

14. RESTORE EXISTING PENETRATION TO MATCH EXISTING
SEQUENCING AND 85M02.

SPECIFICATION SECTION 01140 FOR POSSIBLE WORK
BLOWERS HAVE BEEN DEMOLISHED. REFER TO

13. DEMOLISH 6-INCH AIR PIPING AFTER ALL EXISTING
INSTALLED AND ARE FULLY OPERABLE.

ONSITE UNTIL ALL THE NEW BLOWERS HAVE BEEN

12. CONTRACTOR SHALL STORE ONE EXISTING BLOWER
THE AWT CLARIFIER/FILTER UNITS.

ACTUATORS HAVE BEEN REPLACED FOR ALL FOUR OF

REMAIN IN SERVICE UNTIL THE PNEUMATIC WASTE GATE
NEW BLOWERS PER 85M02. AIR COMPRESSOR SHALL

ASSOCIATED PIPING TO FACILITATE INSTALLATION OF

11. TEMPORARILY RELOCATE AIR COMPRESSOR AND
INDICATED ON 85M02.

10. REPLACE EXISTING 6-INCH ELBOW WITH A TEE AS
PERMANENT BLIND FLANGE.

PIPE FLUSH WITH EXISTING GRADE AND PROVIDE

9. EXISTING 4" SW PIPE TO BE ABANDONED N PLACE. CUT
AND ASSOCIATED PIPING AND SUPPORTS.

8. DEMOLISH THE SURFACE WASH SWEEPS (TYPICAL OF 12)

7. REMOVE ADSORPTION CLARIFIER MEDIA.
6/85D03. OTHER WASTE GATES NOT SHOWN FOR CLARITY.

ON EACH AWT CLARIFIER/FILTER UNIT. REFER TO PHOTO

6. DEMOLISH EXISTING PNEUMATIC WASTE GATE ACTUATOR

5. REMOVE FILTER MEDIA AND FILTER GRAVEL SUPPORT.

4. DEMOLISH AIR PIPING AND SUPPORTS.

3. DEMOLISH PRIMARY COAGULANT FEED PUMP.

2. DEMOLISH AIR BLOWER.

1. DEMOLISH VALVES.

Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:05-04'00'

Page 438 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:11
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85D02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1085D002.dgn
1 #
GENERAL NOTES:

KEY NOTES:
1 B
85D01
1 2 3
85D01 85D01
85D01
1 3
2 2

SECTION AND PHOTOS

1. REFER TO GENERAL NOTES ON 00D01.

NO SCALE
EYY
5 4
4 6
8660F1085D02A 8660F1085D02B
8660F1085D02C 8660F1085D02D
tum
adhay
7 4
2 2
WITH EXISTING GRADE AND PROVIDE PERMANENT BLIND FLANGE.

7. EXISTING 4" SW PIPE TO BE ABANDONED IN PLACE. CUT PIPE FLUSH PIPING AND SUPPORTS.

6. DEMOLISH SURFACE WASH SYSTEM EQUIPMENT AND ASSOCIATED BLOWERS.

5. DEMOLISH EXISTING LOCAL CONTROL PANEL FOR TWO AIR
AND FOUR SOLENOID VALVES.

BLOWER, EIGHT FILTER VALVES, AND FOUR AIR SCOUR VALVES, SOURCE TO EQUIPMENT LOCATION. THIS IS TYPICAL FOR TWO AIR

ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND CONTROL

4. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS FOR FILTERS.

3. DEMOLISH SOLENOID VALVE. TYPICAL OF FOUR SOLENOID VALVES

2. DEMOLISH AIR BLOWER AND ASSOCIATED PIPING AND SUPPORTS.

1. DEMOLISH VALVE. TYPICAL OF EIGHT VALVES FOR THE FILTERS.

AWT CLARIFIER/FILTER
JD
14 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:11-04'00'

Page 439 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:18:43
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85D03
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1085D003.dgn
#
GENERAL NOTES:

KEY NOTES:

PHOTOS
5 8660F1085D03-5
85D01
2 1
1 1. REFER TO GENERAL NOTES ON 00D01
EYY
3 AWT CLARIFIER/FILTER
4 5
4 8660F1085D03-4
85D01
6 85D01
8660F1085D03C
6 7
85D01
EXISTING PLC-3 PANEL ELEVATION EXTERIOR
8660F1085D03D
7 eparker
8 SURFACE WASH SWEEPS.

8. DEMOLISH PIPING AND SUPPORTS ASSOCIATED WITH THE
SECTION 11802 AND CONTRACT DRAWINGS.

BE REPLACED WITH VCP-3 AS SPECIFIED IN SPECIFICATION
ALL COMPONENTS TO THE OWNER. EXISTING PLC-3 PANEL SHALL

7. DEMOLISH THE EXISTING PLC-3 PANEL. SALVAGE AND TURN OVER

6. DEMOLISH PORTION OF AIR WASH LINE.

CLARIFIER/FILTER UNITS.

TO SPECIFICATION SECTION 11802. TYPICAL OF AWT

5. DEMOLISH EXISTING PNEUMATIC RAM OF WASTE GATES. REFER CONTROLLER INSTALLATION.

EXISTING CONDUCTORS AND CONDUITS IN PLACE FOR NEW

4. DEMOLISH COAGULANT FEED PUMP CONTROLLER UNIT. PROTECT FOR CLARIFIERS.

CONTROL SOURCE TO EQUIPMENT LOCATION. THIS IS TYPICAL

ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND

3. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS AND CONTROL CONDUCTORS IN PLACE.

2. DEMOLISH COAGULANT FEED PUMP. PROTECT EXISTING POWER CLARIFIERS.

1. DEMOLISH VALVE. TYPICAL OF EIGHT VALVES FOR THE
JD
15 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:16-04'00'

Page 440 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:18:04
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
87D01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1087D001.dgn
A
2 BACKWASH PUMP STATION

NO SCALE
EB
1 tum
adhay
PLAN
1 #
GENERAL NOTES:

KEY NOTES:

1. REFER TO GENERAL NOTES ON 00D01.
8660F1087D01A
1 -
8660F1087D01B
2 -
8660F1087D01C
2 -
-
1 2
3 EX - 1" FE
EX - 1 1/2" FE
EX - 1 1/2" FE
EX - 3/4" FE
(PVC)
(PVC)
4 (PVC)
(PVC)
ON 87M01.

5. REMOVE, PROTECT, AND REINSTALL BUTTERFLY VALVE AS SHOWN PLACE FOR NEW ANALYZER INSTALLATION.

4. PROTECT SIGNAL AND POWER CONDUCTORS AND CONDUITS IN

3. DEMOLISH EXISTING SURFACE WASH PUMP.

ENCLOSURE IN PLACE.

2. DEMOLISH CHLORINE ANALYZER 3. PROTECT THE EXISTING

1. DEMOLISH SAMPLE PUMP 3.
5 JD
16 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:22-04'00'

Page 441 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405

P
lotD
ate: 06-APR
-2023 11:17:39
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89D01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1089D001.dgn
A
8660F002D01.jpg
1 2

CAROUSEL PUMP STATION

NO SCALE
EB
TRF-3E
1 89D02
PLAN
89D02
5 2
3 4
#
GENERAL NOTES:

KEY NOTES:

1. REFER TO GENERAL NOTES ON 00D01.
eparker
DRAWINGS FOR SPECIFIC REQUIREMENTS.

5. DEMOLISH 1 KVA, 480 V TRANSFORMER. REFER TO ELECTRICAL

4. REMOVE EXISTING MOTOR OF EFFLUENT PUMP.

ELECTRICAL DRAWINGS FOR SPECIFIC REQUIREMENTS.

3. DEMOLISH MAIN DISCONNECT SWITCH 200 A, 3-POLE. REFER TO DRAWINGS FOR SPECIFIC REQUIREMENTS.

2. DEMOLISH MOTOR CONTROL CABINET. REFER TO ELECTRICAL

1. DEMOLISH EFFLUENT PUMP.

JD
17 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:28-04'00'

Page 442 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:43
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89D02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10

CAROUSEL PUMP STATION
EB
#
GENERAL NOTES:

KEY NOTES:

INFORMATION.

DIAGRAM FOR MORE ELECTRICAL DEMOLITION

2. REFER TO CAROUSEL PUMP STATION DEMO ONE-LINE

1. REFER TO GENERAL NOTES ON 00D01.
2 1
2 8660F1002D01-1.JPG
89D01
5 6
2 4
2 1
8660F1002D01-3.JPG
89D01
PHOTOS
8660F1089D002.dgn

6. DEMOLISH MAIN DISCONNECT SWITCH 200 A, 3-POLE.

5. DEMOLISH 1 KVA, 480 V TRANSFORMER.

4. DEMOLISH MOTOR CONTROL CABINET.

PUMP IN PLACE FOR NEW MOTOR INSTALLATION.

3. DEMOLISH EXISTING MOTOR OF EFFLUENT PUMPS. PROTECT
CONTROL SOURCE TO EQUIPMENT LOCATION.

ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND

2. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS

1. DEMOLISH EFFLUENT PUMP.
3 JD
18 eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:34-04'00'

Page 443 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023
2:04:14
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
91D01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

BAC

DEMOLITION
8660F10 8660F1091D001.dgn
A
1 #
GENERAL NOTES:

KEY NOTES:

SLUDGE LAGOON
PLAN
8660F1000D01.jpg

NO SCALE

1. REFER TO GENERAL NOTES ON 00D01.

CA
2 3

3. REGRADE EXISTING POND AREA PER DRAWING 91C01.

2. REMOVED EXISTING SLUDGE PIPING.

1. DEMOLISH CENTER BERM.

JM
19 JG
arretty
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:26:48-07'00'

Page 444 of 3073 ends

CONTROL POINT

SYMBOLS

EXISTING MONUMENT

EXISTING CONTROL POINT

SYMBOL DESCRIPTION

FLOW/SLOPE

DIRECTION

MANHOLE (PROFILE)

MANHOLE (PLAN)

PULL BOX

POWER TOWER

SYMBOL DESCRIPTION

ROCK WALL

HEADWALL

CABLE TV

UTILITY POLE

UTILITY POLE GUY WIRE

COORDINATES

SLOPE CALLOUT

GUARD POST

CONTROL POINT
2 1
X 1325.00
PT
RADIUS
ANGLE

CLOCKWISE
PC
P
CTV
PH

SHRUB/HEDGE
TREE

T TELEPHONE PEDESTAL
CO

CLEANOUT
LIGHT
PP

POWER POLE

SIGN/SIGN POST

ELECTRICAL MANHOLE

AND PULL BOX
GATE

LINE WORK

EDGE OF PVMT OR

OUTSIDE FACE OF
CURB
CXX

SPOT ELEVATION

EXISTING SPOT ELEVATION
2:1
XX
N=XXXXXX.XX
E=XXXXXX.XX
N=1600000 E=1000000

2.0%

FIRE HYDRANT

CATCH BASIN
E

POTHOLE

POTHOLE NUMBER
SHORING /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\

FLOWLINE

GUARDRAIL

NEW ROAD

EXISTING CONTOURS (SCREENED)

NEW FENCE

POWER POLE & LINE

EXISTING FENCE (SCREENED)

EXISTING ROAD (SCREENED)

PROPERTY LINE OR RIGHT OF WAY

REMOVE OR ABANDONED (CROSS
HATCHING: FENCE SHOWN AS EXAMPLE)
SLOPE

EXISTING PIPING (TRIPLE LINES) (SCREENED)

NEW PIPING (SINGLE LINE)

NEW PIPING (TRIPLE LINES)

EXISTING STRUCTURES (SCREENED)

EXISTING PIPING (SINGLE LINE)(SCREENED)

CENTER, MONUMENT, OR SURVEY LINE
PP
X X
X X

OHE OHE

CABLE TV (UNDERGROUND) CTV CTV

FIBER OPTIC

NATURAL GAS G G

SANITARY SEWER

STORM DRAIN
310
310

NEW STRUCTURES OR EDGE OF PAVEMENT

FUTURE ROAD, WATER EDGE OR RIDGE

HIDDEN LINE OR TRAIL EDGE
FO FO

UNDERGROUND ELECTRIC

RAILROAD TRACKS
FUEL

TELEPHONE
WATER

NEW CONTOURS

SILT FENCE SF SF SF

EASEMENT

EXISTING EASEMENT

CITY LIMITS

EXISTING GRADE (PROFILE)

PROPOSED GRADE (PROFILE)
CURB

CURB & GUTTER

HATCH PATTERNS
SWALE
S=0.0020

M METER BOX
NOTE: ALL SYMBOLS SHOWN AS NEW.

EXISTING SYMBOLS ARE SCREENED.

COORDINATES / ELEVATION

ROADWAY / PIPE CURVES

ROADWAY / PIPE CURVE
(SEE TABLE ON EACH

PAVING AND GRADING OR

CIVIL PIPING DWG WITH
ROADWAY / PIPE CURVES.)

LOC LOC

SECTION CUT

TYPICAL DETAIL

REFERENCE

EXTERIOR ELEVATION
VIEWS

PHOTO LOCATION

GRID BUBBLE

PLAN/TITLE

SECTION OR DETAIL

TITLE W/ REFERENCE

DETAIL CALL-OUT
(ENLARGED)

ARROW INDICATES

POINT OF VIEW
DRAWING REFERENCE ##X##

PLAN NOT REFERENCED

DETAIL REFERENCES

SYMBOL DESCRIPTION

REVISION DELTA
SCALE

KEY NOTE

BREAK LINE

ELEVATION
TOC XXXX.XX

EXISTING ELEVATION

PIPE BREAK

PLAN VIEW

PIPE BREAK

CROSS SECTION

PIPE CONTINUATION
(SINGLE LINE)

BRACKET

EX TOW XXXX.X±

UNDERGROUND/

OVERHEAD

WARNING
(STATE/REGION

SPECIFIC)

NORTH ARROW/

PLANT NORTH

EQUIPMENT/DEVICE

KEY TAG

PIPE TAG
VIEW

AREA DESIGNATOR
(WHEN APPLICABLE)

DISCIPLINE DESIGNATOR

CONSECUTIVE

SHEET NUMBER

TYPICAL DETAIL TITLE

SHEETS IN
DETAIL

MODIFICATION NOTE
S = STANDARD
J = JOB SPECIFIC
R = REVISED
N = NOTE TO TYPICAL DETAIL USER

DATE CREATED
(REVISED)
LENGTH

CURVE NUMBER

RADIUS POINT
XX
*

FUTURE PIPING
(WHERE APPLICABLE)
FUTURE
* FOR EXISTING PIPING SHOW AS

EX SIZE FLOW STREAM

UGE UGE
F F
SS SS
SD SD

TEL TEL
W W

FORCEMAIN SANITARY SEWER FM FM

BURIED VALVE

PIPE CAP OR

CONNECTION

CHECK VALVE
FLANGE

PLUG VALVE

REDUCER

AIR RELEASE VALVE

BLOW OFF VALVE

SERVICE CONNECTION

HOSE BIBB / YARD HYDRANT

BALL VALVE

GATE VALVE

BUTTERFLY VALVE

LIMITS OF CONSTRUCTION
##X##
1 SEE INDICATED

DRAWING
VIEW

DRAWING CUT ORIGINATION
ALPHA = SECTION
NUMERIC = DETAIL
PHX

SOIL BORING LOCATIONS
B-XX
XX

EQUIPMENT/DEVICE
NUMBER

STAGING AREA
CLSM

TREAD PLATE

AGGREGATE

BASE COURSE
(ABC)

ASPHALT PAVING

GRATING

BEDROCK

CONCRETE
(ALL CLASSES)

DRAIN ROCK
GRAVEL
RIPRAP

EXISTING/

UNDISTURBED
SOIL

STRUCTURAL

FILL OR BACKFILL
STEEL

LANDSCAPING
OR
(WITH AERIAL)
SPAN
SCALE:

FILE:

PLAN

DESCRIPTION
FILE

A SCALE

VIEW TITLE
A
##X##
- = SHOWN ON SAME DRAWING
##X## = SEE INDICATED DRAWING
VIEW
SCALE:

FILE:

C/1 ELEVATION
##X## SCALE
FILE

DESCRIPTION

VIEW TITLE
TYP
?
TYPICAL DETAIL #
#
-
##X##
A
A
1 TYP
SHT OF XX/XX/20XX XX
LINE 3
LINE 2
S
? LINE 1
TYPICAL DETAIL #
34 1

XXX-XX-XXX
0 10' 20' 40'
SCALE: 1" = 20'
2 MATCH LINE MATCH LINE STA XXX SEE DWG XXX
X" XXX

PIPE SIZE

FLOW STREAM

30.0°
NORTH
TRUE
PLANT
NORTH
XX.XX

ANY SPECIFIC DESIGNATIONS

NOTED WILL NEED TO REFER TO

ABBREVIATIONS
PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JRD
JM
00C01
20 CIVIL

GENERAL CIVIL LEGEND AND SYMBOLS
8660F1000C01.dwg
gdavis
8660F10
10/5/2022 11:08:46 AM
usanorth811.org

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:13:25-07'00'

Page 445 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

SCHEDULES
GENERAL PIPELINE NOTES:

NOTES

1. DIMENSIONS TO STRUCTURES, REFERENCED PIPING, PAVING, AND OTHER IMPROVEMENTS IS APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS 14 DAYS IN ADVANCE OF THE CONSTRUCTION PROGRESS. THE CONTRACTOR SHALL REPORT ANY
DISCREPANCIES TO THE ENGINEER.

2. CONTRACTOR SHALL MAINTAIN A MINIMUM CLEARANCE OF 10 FEET HORIZONTAL AND 3 FEET VERTICAL BETWEEN THE SEWER LINES AND EXISTING WATER LINES.

3. REFER TO THE GEOTECHNICAL REPORT LOCATED IN THE APPENDIX OF

THE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THE
GEOTECHNICAL CONDITIONS AND BORING INFORMATION.

4. IN ALL LOCATIONS WHERE TRENCH PLATE IS USED FOR VEHICULAR OR

PEDESTRIAN TRAFFIC, THE CONTRACTOR SHALL APPLY SKID RESISTANT

COATING ON THE TRENCH PLATES AND COLD MIX ASPHALT CONCRETE AT THE EDGES. THE TRENCH PLATES SHALL BE NOTCHED INTO THE ASPHALT,

CONCRETE, OR TRAVELED SURFACE TO PREVENT SLIPPAGE AND ROCKING UNDER TRAFFIC.

5. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PROPERTIES ADJACENT TO THE WORK, THROUGHOUT THE CONSTRUCTION PERIOD.

6. ALL OPEN TRENCHES, WORK AREAS AND SHAFTS SHALL HAVE A SHORING SYSTEM IN ACCORDANCE WITH OSHA, STATE AND LOCAL REQUIREMENTS.

7. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, COUNTY,

AND LOCAL LAWS AND ORDINANCES RELATING TO THE SAFETY AND CHARACTER OF WORK, EQUIPMENT AND PERSONNEL. THIS INCLUDES BUT

IS NOT LIMITED TO SHEETING, SHORING, BRACING, VENTILATION,

CONFORMANCE WITH TRAFFIC CONTROL AND MAINTENANCE OF
BARRICADES AND WARNING DEVICES.

8. LAYOUT DRAWINGS ARE REQUIRED FOR PIPING INSTALLED.

9. ALL ROAD DITCHES, FENCE LINES, PASTURES AND SIMILAR AREAS SHALL BE RESTORED PER SPECIFICATION 02952.

10. ALL CROPPED AREAS DISTURBED SHALL HAVE THE TOPSOIL REPLACED AND THE ENTIRE AREA DISTURBED SHALL BE RIPPED 2 FT DEEP PER THE LAND OWNERS REQUIREMENTS.

11. CONTRACTOR SHALL TAKE ALL PRACTICAL PRECAUTIONS TO MINIMIZE DISTURBANCES TO STREAMS, VEGETATION, TREES AND CROP LANDS.

WHEREVER PRACTICAL LEAVE EXISTING TREES AND VEGETATED AREAS UNDISTURBED.

UTILITY NOTES:

EARTHWORK NOTES:

1. CLEAR THE CONSTRUCTION AREA OF NATURAL OBSTRUCTIONS EXISTING

FOUNDATIONS, BUILDINGS, FENCES, LUMBER, WALLS, STUMPS, BRUSH,

WEEDS, RUBBISH, TREES, BOULDERS, AND ANY OTHER ITEMS WHICH

INTERFERES WITH CONSTRUCTION OPERATIONS OR ARE DESIGNATED FOR REMOVAL.

2. GRUB OUT AND DISPOSE OF TREE TRUNKS AND ROOT MATERIAL BELOW THE GROUND SURFACE REMAINING AFTER CLEARING.

3. DISPOSE OF THE UNACCEPTABLE BACKFILL MATERIAL FROM THE CLEARING AND GRUBBING OPERATIONS AT NO ADDITIONAL COST TO THE OWNER.

4. STRIP AND STOCKPILE THE TOPSOIL. THE DEPTH OF STRIPPING SHALL BE ESTIMATED TO BE 12-INCHES BUT WILL BE DETERMINED IN THE FIELD AS SOIL CONDITIONS DICTATE.

5. REPLACE STOCKPILED SOIL AND RESTORE SITE AS SPECIFIED.

6. ROCK AND AGGREGATE STORAGE AREAS SHALL BE RESTORED BY

EXCAVATING ANY SOILS CONTAINING ROCK OR AGGREGATE AND
BACKFILLING WITH TOPSOIL. SOIL REMOVED MAY BE USED FOR TRENCH BACKFILL ABOVE THE PIPE ZONE AND 3 FEET BELOW FINISHED GRADE.

1. EXISTING UTILITIES IN THE PROJECT MAY BE IN A FRAGILE CONDITION. THE

CONTRACTOR SHALL EXERCISE NECESSARY CAUTION WHEN WORKING NEAR EXISTING UTILITIES.

2. PLAN LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES ARE BASED ON

RECORD DRAWINGS, POTHOLING AND SURVEY INFORMATION AND ARE CONSIDERED APPROXIMATE ONLY. WHERE NO ELEVATIONS ARE SHOWN, NO INFORMATION WAS AVAILABLE DURING THE DESIGN PERIOD.

3. SOME UTILITY SERVICES MAY NOT BE SHOWN ON THESE DRAWINGS. THE

CONTRACTOR SHALL TAKE NECESSARY MEASURES TO LOCATE AND
PROTECT SERVICE DURING CONSTRUCTION.

4. CONTRACTOR SHALL CALL THE "LOCAL UTILITY LOCATOR" AT 1-800-277-2600 PRIOR TO ANY EXCAVATION ACTIVITIES.

5. THE LOCATION, SIZE, AND MATERIALS OF EXISTING UNDERGROUND

UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND IS SHOWN FOR BIDDING PURPOSES. THE CONTRACTOR SHALL BE RESPONSIBLE TO

CONTACT THE UTILITY OWNERS SO THAT THOSE UTILITIES MAY MARK THE LOCATION OF THEIR UTILITIES PRIOR TO ANY EXCAVATION ACTIVITIES. THE

CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT EXISTING UTILITIES.

GENERAL NOTES:

1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEETS OF THESE CONTRACT DOCUMENTS AS IF THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD

VERIFYING ALL EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT

BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.

3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.

4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK. DETAILS SHALL BE IN THE SAME AS FOR OTHER SIMILAR WORK.

5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE REGULATIONS AND REQUIREMENTS.

6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING

AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR

SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN/CONNECTION LOCATIONS

AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE OWNER.

7. ALL PIPELINES 12" AND LARGER SHALL HAVE A MINIMUM COVER OF 36" UNLESS THE COVER DEPTH IS SPECIFICALLY INDICATED ON THE DRAWINGS. PIPE SMALLER THAN 12" SHALL HAVE A MINIMUM COVER OF 30" UNLESS NOTED OTHERWISE. PIPES SHALL BE ROUTED AS SHOWN UNLESS MINOR REVISIONS ARE NECESSARY TO MISS EXISTING PIPES, STRUCTURES, ETC. CONTRACTOR SHALL BE RESPONSIBLE

FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE ROUTING CHANGES AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL INCLUDE COST FOR THIS IN THE BID.

8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM AVAILABLE RECORDS OR ELECTRONIC FILES. NEITHER THE OWNER NOR ENGINEER ASSUMES ANY RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN. THE

CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL TYPES, AND ELEVATIONS SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF CONSTRUCTION.

9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM DAMAGE EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE.

ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED

OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE WITHOUT ADDITIONAL COMPENSATION.

10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND

SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS. PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.

11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHERWISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE FINISHED GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.

12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE AS FOLLOWS FOR QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES.

SEE SCHEDULE ON SHEET 00G03

13. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED BY THE PLANT.

14. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.

WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER

PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED TO MAINTAIN SERVICE BY THE PLANT.

15. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES. THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE. DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR SHOWN OTHERWISE.

16. ALL SIDEWALKS TO BE 3'-0" WIDE UNLESS SHOWN OTHERWISE.

17. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE OWNER OF THE ELECTRIC LINES.

18. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND FACILITIES.

19. CONTRACTOR SHALL VERIFY LOCATION OF ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL ITEMS BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE. ALSO, STRUCTURAL DIMENSIONS

AND OPENINGS CONTROLLED BY ARCHITECTURAL, MECHANICAL, OR ELECTRICAL EQUIPMENT SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.

20. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND

REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER CONTRACT DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.

PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JDM
BWA
00C02
21 CIVIL

GENERAL CIVIL NOTES AND SCHEDULES
8660F1000C02.dwg
JDiDonato
8660F10
10/5/2022 11:07:47 AM
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:13:40-07'00'

Page 446 of 3073 ends

EC
EC
EC
EC
EC
EC
EC
EC
EC
Plot Date: 4/7/2023 9:49:49 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
00C03
22 CIVIL

WWTP SITE PLAN
8660F1000C03.dwg JDiDonato 8660F10
FILE:

PLAN
8660F10C04

DIGESTER
NO. 1

DIGESTER
NO. 2
SLUDGE

DE-WATERING

FACILITY

NORTH POND MIDDLE POND

BACKWASH

PUMP STATION

TRUCK FILL HYDRANT
(PHASE 3) TO BE REMOVED

AND REPLACED DURING

POND CONSTRUCTION

SOUTH POND
EX 12" SL

EXISTING

DREDGE LINE
2 1
EX 6" SL
6" SL
KEY NOTES:

1. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,

CONTRACTOR SHALL FIELD VERIFY THE

LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 6" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.

2. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,

CONTRACTOR SHALL FIELD VERIFY THE

LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 12" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.

GENERAL NOTES:

1. THE LOCATIONS OF UTILITIES SHOWN ARE
APPROXIMATE. CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFICATION OF ALL RELEVANT
EXISTING UTILITIES.

X
SCALE
0 20' 40' 80'
SCALE: 1" = 40'
Know what's below.

Callbefore you dig.

Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:13:56-07'00'

Page 447 of 3073 ends

EC

G G G G G G G G G G G G G G G G G G G G G G

G G G G G G G G

G G G G G G
570
570
580
580
BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
3:1
3:1
3:1
3:1
3:1
3:1
3:1

9.3%
3:1
3:1
3:1
3:1
3:1
3:1
575
580
572 573 574
576 577 578 579
581
575
580
573
574
576
577
578
579
581
575
580
580
572
573
574
576
576
577
577
578
578
579
579
581
581
580
576
577
578
579
581
570
575
571
571
571
572
572
572
573
574
576
577
580
577
578
579
581
575 576 577 578
571
Plot Date: 4/7/2023 9:32:31 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
OV
BWA
91C01
23 CIVIL

PAU GRADING PLAN
8660F1091C01.dwg atucker 8660F10
FILE:

PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

KEY NOTES:

1. FINISHED GRADE OF THE BOTTOM OF THE PAU

SHALL BE SLOPED FROM THE TOE OF THE SLOPE
TO THE PUMP STATION INLET.

2. RECYCLED WATER INFRASTRUCTURE SHALL
REMAIN IN SERVICE DURING CONSTRUCTION.

PROTECT IN PLACE.

3. REFER TO SHEET 91C07 FOR PAU INLET PIPING
ALIGNMENT AND PROFILE.

4. REFER TO SHEET 91C08 FOR PAU OUTLET PIPING
ALIGNMENT AND PROFILE.

5. REFER TO SHEET 91S04 FOR PAU INLET
STRUCTURE.

6. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCHES AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE SEALED

IN ACCORDANCE WITH SPECIFICATION SECTION
02747.

7. THE CONTRACTOR SHALL DECOMMISSION THE

EXISTING BURIED ELECTRIC UTILITY BEFORE PAU
CONSTRUCTION. REFER TO SPECIFICATION
SECTION 01140 FOR WORK RESTRICTIONS. THE

CONTRACTOR SHALL REESTABLISH THE BURIED

ELECTRIC UTILITY AS SHOWN ON THE ELECTRIC
SITE PLAN. REFER TO DWG 01E02.

8. 8" THICK SLAB ON GRADE WITH #5@12" O.C. EACH
WAY. REFER TO DETAIL 5/91C04.

9. 8" THICK SLOPED SLAB ON GRADE (WALL) WITH
#5@12" O.C. EACH WAY. REFER TO DETAIL 5/91C04
AND DETAIL 7/91C04.

10. CONSTRUCTION JOINTS IN SLAB ON GRADE
SPACED AT MAXIMUM 20'-0" O.C. IN EACH
DIRECTION. THE JOINTS SHALL AS PER TYPICAL
DETAIL S110 WITH WATER STOP AND EXTEND
THROUGH THE SLOPED SLAB ON GRADE (WALL).

11. EXPANSION JOINT PER DETAIL 6 /91C04 TYPICAL
ALL AROUND THE BASIN.

12. TOP OF THE BERM CONCRETE LINER DETAIL PER
DETAIL 7/91C04 TYPICAL ALL AROUND THE BASIN.

13. ADJUST CONSTRUCTION JOINT LOCATION TO
ACCOMMODATE INLET STRUCTURES.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

3. REFER TO SPECIFICATION SECTION 02300 AND
02301 FOR EARTHWORK AND BACKFILL
REQUIREMENTS.

4. THE CONTRACTOR SHALL REMOVE ALL EXISTING
SLUDGE MATERIAL. THE SLUDGE MATERIALS

SHALL BE REMOVED TO AN APPROXIMATE
ELEVATION OF 567 FEET.

X
16" RW 30" RW
16" SE

PRODUCTION

AUGMENTATION UNIT

RW METER
VAULT
(PHASE 3)
TO PHASE 3

DISTRIBUTION SYSTEM

TOP OF BERM

PAU PUMP STATION

INLET INVERT
ELEVATION = 570.0
12" SE
1 TOE OF
SLOPE

CAUTION HIGH

PRESSURE GAS PIPELINE

TOE OF SLOPE
2 2

TOE OF SLOPE
3 4
1 91C03
D
91C02
E
91C02
A
91C02
13'
13'
13'
C
91C02
B
91C02
13'

TOE OF SLOPE
CUT: 31974 CUBIC YARDS
FILL: 2747 CUBIC YARDS
91C06
A

EX SLUDGE

DEWATERING

FACILITY

EX CHLORINE

CONTACT BASINS
LEGEND:

CONCRETE BASIN DESIGN PER 91C03
EX

OPERATIONS

BUILDING

PAU INLET PIPING
INVERT ELEVATION =
570.78

TOE OF SLOPE
ELEVATION = 571.28

TOE OF SLOPE
ELEVATION = 571.40

TOE OF SLOPE
TOE OF SLOPE ELEVATION = 571.24
ELEVATION = 571.37

TOE OF SLOPE
ELEVATION = 571.63

TOE OF SLOPE
ELEVATION = 571.47

TOE OF SLOPE
ELEVATION = 571.47

TOE OF SLOPE
ELEVATION = 571.12

FUTURE CHLORINE CONTACT BASIN

EX CAROUSEL

PUMP STATION

EX BACKWASH

PUMP STATION
6 7
8 9
10 11
12 13
13 TYP
CF161
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:11-07'00'

Page 448 of 3073 ends

560
565
570
575
580
585
590
560
565
570
575
580
585
590
9+60 10+00 11+00 12+00

0.0%

0.0%
STA 10+00.00

BEGIN ACCESS RAMP
FG 581.00
STA 10+43.99OFFSET =12.26' LFG 581.00
STA 11+51.73
OFFSET 34.43' LFG 570.95
FG @

CENTERLINE

APPROX EXIST
GROUND @

CENTERLINE
-9.3%
565

GROUND WATER ELEV
13'

FG ELEV
571.37

TOP OF BERM
FG ELEV 581.00
3:1
579
FG @ CENTERLINE

APPROX EXIST
GROUND @ CENTERLINE
565

GROUND WATER ELEV
3:1

APPROX EXIST
GROUND @ CENTERLINE
13'

APPROX EXIST
GROUND @ CENTERLINE
FG @ CENTERLINE

FG ELEV
571.12

TOP OF BERM
FG ELEV 581.00
579
3:1

PREVENT RUNOFF FROM

COLLECTING AT THE TOE

OF THE SLOPE (TYP)

OUTER SLOPE OF BERM
TO BE MINIMUM 3H:1V.

REGRADE AS REQUIRED
565

GROUND WATER ELEV
-120-100
13'

FG ELEV
571.47

TOP OF BERM
FG ELEV 581.00
579
565

GROUND WATER ELEV
FG @ CENTERLINE
3:1
3:1

APPROX EXIST
GROUND @ CENTERLINE
13'

FG ELEV
571.28

TOP OF BERM
FG ELEV 581.00
-120-100
579
565

GROUND WATER ELEV
3:1
3:1
FG @ CENTERLINE

APPROX EXIST
GROUND @ CENTERLINE
Plot Date: 4/7/2023 9:50:32 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C02
24 CIVIL
PAU

PROFILE AND SECTIONS
8660F1091C02.dwg JDiDonato 8660F10
Know what's below.

Callbefore you dig.

FILE:

A PROFILE
91C01

POND ACESS RAMP
POND AWT STORAGE.dwg
SCALE:

FILE:

B SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 14+25
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 25' 50' 100'
SCALE: 1" = 50'
(VERT)
SCALE:

FILE:

C SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 16+50
SCALE:

FILE:

D SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 19+50
SCALE:

FILE:

E SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION ST 23+60
GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. PAU TO BE CONSTRUCTED PER SPECIFICATION
SECTIONS 02300 AND 02301.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

4. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCH AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE

SEALED IN ACCORDANCE WITH SPECIFICATION
SECTION 02747.

5. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

6. THE CROSS-SECTIONS ON THIS SHEET ONLY
DEPICT EXISTING AND FINAL ELEVATIONS. REFER
TO DRAWING 91C03 FOR CONCRETE BASIN

DETAILS AND SUB-GRADE PREPARATION
REQUIREMENTS.

Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:26-07'00'

Page 449 of 3073 ends

KEY NOTES:

1. EXTEND OVER EXCAVATION 5 FT LATERALLLY
BEYOND THE EDGE OF THE BASIN BOTTOM.

2. SLOPE OUTSIDE OF BERM TO MEET EXISTING
GRADE.

3. NATIVE MATERIAL, MINUS ORGANICS, DEBRIS,

AND OTHER DELETERIOUS MATERIALS ARE

SUITABLE FOR ENGINEERED FILL IF NOT
EXCEEDING A MAXIMUM PARTICLE SIZE OF 4
INCHES. EXCAVATED MATERIALS UNSUITABLE

FOR USE AS STRUCTURAL FILL CAN BE PLACED

OUTSIDE OF THE STRUCTURE LIMITS, OR
DISPOSED OFF-SITE.

4. BENCH FILL INTO THE EXISTING EMBANKMENT AT
A MINIMUM OF 1'H:1'V OF FILL PLACED, OR AS

NECESSARY TO REMOVE LOOSE MATERIAL AND

PROVIDE PROPER COMPACTION ALONG THE
ZONE OF TRANSITION.

5. IF IMPORTED SOIL IS REQUIRED FOR

CONSTRUCTION DUE TO EXISTING BACKFILL

MATERIAL BEING UNSUITABLE, THE

GEOTECHNICAL ENGINEER MUST REVIEW AND

APPROVE SOILS FOR USE PRIOR TO TRANSPORT
TO THE SITE.

6. BERM TO BE CONSTRUCTED IN ACCORDANCE
WITH SPECIFICATION SECTIONS 02300 AND 02301.

GENERAL NOTES:

1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN

ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT

SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

X
PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JRD
BWA
91C03
25 CIVIL
PAU DETAILS 1
8660F1091C03.dwg
JDiDonato
8660F10
9/12/2022 7:29:07 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

SCALE:

FILE:
1 DETAIL
- 3/4"=1'-0"
8660F1091C03

TOP OF BERM
SCALE:

FILE:
2 DETAIL
- 3/4"=1'-0"
8660F1091C03

VEHICULAR ACCESS RAMP
SCALE:

FILE:
3 DETAIL
- 3/4"=1'-0"
8660F1091C03

EXCAVATION SECTION
SCALE:

FILE:
4 DETAIL
- 3/4"=1'-0"
8660F1091C03

CONCRETE BASIN SECTION
2% SLOPE
2'-0"
13'-0"
10'-6" 6"
VARIES
SEE SHEET 91C01

SLOPE VARIES
SEE SHEET 91C01
(3:1 MAX)

TOP OF BERM
6" MIN 100% CRUSHED CLASS 2 AGGREGATE
BASE (1 1/2") COMPLACT WITH VIBRATORY
DRUM TO 95% R.C., ACCESS ROAD TO BE
SEALED IN ACCORDANCE WITH SECTION 02747

CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

BACKFILL STABILIZED AND
COMPACTED IN 8 INCH LIFTS
PER SECTION 02300 3:1
3:1

CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

CONCRETE RAMP
6 91C04
8 91C04
3:1
#5@12" O.C. BOTH WAYS
@ MIDDLE SLAB (TYP)
5 91C04
(TYP)

EX TOP OF BERM
(EL 581)

NATIVE MATERIAL BERM

PROPOSED BASIN AREA

LIMIT OF OVER EXCAVATION
(EL 566)
FG EL 570
5'-0" 5'-0"
1 1

OVER EXCAVATE TO REMOVE

ALL SLUDGE SEDIMENTS FROM

EXISTING BASIN

NATIVE MATERIAL BERM

EX TOP OF BERM
(EL 581)

TOP OF BERM
(FG EL 581)
3:1
3:1
6 91C04
10'-6"

OVERBUILD BERM AND

CUT BACK TO NEAT LINES
4 CONCRETE LINER INSTALLED
PER DETAIL 5/91C04

FINISHED GRADE
PER SHEET 91C01

TOP OF BERM
(FG EL 581)
6 NATIVE MATERIAL BERM. CONSTRUCT BERM IN
8" LOOSE LIFTS COMPACTED TO 90% RC
3 2

ACCESS ROAD FILL

AGGREGATE BASE
LEGEND:

CONCRETE

EXISTING BACKFILL
12'-0"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:14:41-07'00'

Page 450 of 3073 ends

GENERAL NOTES:

1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN

ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT

SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN

OR ACCESS ROAD SHALL BE GRADED TO MEET

EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.

3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS

PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.

PROJECT NO.

LAST SAVED BY:

FILE NAME:

Plot Date:

CDA
JRD
JM
91C04
26 CIVIL
PAU DETAILS 2
8660F1091C04.dwg
atucker
8660F10
9/12/2022 7:29:07 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

COMPACT AGGREGATE

BASE COURSE
COMPACTED TO 95%
SCALE:

FILE:
5 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04

CONCRETE PAVEMENT

OVER EXCAVATION AND

COMPACT AS PER

GEOTECHNICAL REPORT
#5@12" EW
5000 PSI CONCRETE

BROOMED FINISH
5 -
8" 6"
5"
(CLR)
(MIN)
1'-0" 8"
8"
#5@12"
(4) #5 CONT (TYP)
5 -
(TYP)
5 -
(TYP)
(TYP)
#5@12" O.C. EA. WAY
2'-0"
10"
8"
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
12" LAP

BOTH SIDES
12" LAP

BOTH SIDES
8"
1'-0" 8"
1'-0" 8"
1 1.5
1 1.5
Know what's below.

Callbefore you dig.
10" 10" 10" 10"
1'-0" 8"
(4) #5 CONT (TYP)
#5@12"
SCALE:

FILE:
6 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:

FILE:
7 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:

FILE:
8 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04

AGGREGATE BASE
LEGEND:

CONCRETE

EXISTING BACKFILL
1'-8"
1'-8"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:08-07'00'

Page 451 of 3073 ends

BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
L1
L2
L3
L4
L5
L6
L8
L7
L9
L10
L11
L12
L13
L14
L15
L17 L18
C1
C3
C5
C7
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
Curve Table
Curve #
C1
C3
C5
C7
Length

97.48 79.55

40.20 64.42
Radius

61.00 61.00

61.00 41.00
Delta

91.56 74.72

37.76 90.03
Line Table
Line #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L17
L18
Length
210.34

37.34 364.45

43.05 203.84

41.97 134.27

31.23 96.77

39.31 96.77

25.16 5.85

3.52 16.59

14.93 87.28
Direction
N6° 18' 52.04"W
S16° 34' 28.96"W
N85° 14' 31.97"E
S6° 18' 52.04"E
S20° 02' 13.69"E
N5° 53' 12.34"E
S83° 39' 30.43"W
N38° 25' 10.85"W
S9° 52' 16.31"W
N85° 14' 31.97"E
N9° 52' 16.31"E
N6° 17' 51.03"W
N6° 18' 52.04"W
S78° 13' 05.23"W
S57° 44' 59.02"W
N85° 14' 31.97"E
N85° 14' 31.97"E
Plot Date: 4/6/2023 1:19:07 PM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C05
27 CIVIL

PAU SURVEY CONTROL PLAN
8660F1091C05.dwg atucker 8660F10
FILE:

PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

KEY NOTES:

1. LIMIT OF GRADING SHOWN. THE BERM OUTSIDE

OF THE ACCESS ROAD SHOULD BE SLOPED AT
1V:3H TO MEET THE EXISTING GRADE. REFER
TO DRAWING 91C04 FOR TYPICAL BERM
DETAILS.

2. REFER TO DRAWING 91C06 FOR PUMP STATION
AND INLET LOCATIONS.

3. REFER TO DRAWING 91C07 FOR PUMP STATION
AND INLET LOCATIONS.

GENERAL NOTES:

1. REFER TO 91C01 FOR PAU GRADING PLAN.

2. THE PLAN DEPICTS FINISHED GRADE AND
DIMENSIONS. REFER TO 91C04 FOR CONCRETE
BASIN AND SUBGRADE DESIGN DETAILS.

X
TOE OF
SLOPE

TOE OF SLOPE

TOE OF SLOPE
2 3
1 1
1 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:23-07'00'

Page 452 of 3073 ends

L14
N=2168986.26
E=6223803.26
N=2168993.39
E=6223794.92
N=2169020.80
E=6223799.44
N=2169035.82
E=6223789.73
575
580
571
572
573
574
576
577
578
579
Plot Date: 4/6/2023 9:47:21 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
BWA
91C06
28 CIVIL

PAU PUMP STATION PLAN
8660F1091C06.dwg atucker 8660F10
0 2.5' 5' 10'
SCALE: 1" = 5'
Know what's below.

Callbefore you dig.

GENERAL NOTES:

1. REFER TO DRAWING 91S01 FOR PUMP STATION
DIMENSIONS.

SCALE:

FILE:

PLAN
SITE
8660F1073C0801
A 1" = 5'
1 91S03
16" INLET FROM PAU

TO CHLORINATION

STRUCTURE, SEE
DWG 91C08 FOR

CONTINUATION

PRODUCTION

AUGMENTATION UNIT

PAU PUMP

STATION

PAU PUMP STATION

INLET STRUCTURE
LEGEND:

CONCRETE BASIN DESIGN PER 91C03
A
91M01
A/B
91S01
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:15:48-07'00'

Page 453 of 3073 ends

570
580
580
11+75.22
10+00
11+00
STA. 10+22.82
N=2169077.31
E=6224077.77
Δ=90°00'00" LT
EC
11+75.22
10+00
11+00
571.0
STA. 10+93.06
N=2169071.28
E=6224007.79
Δ=45°00'00" RT
STA. 10+04.73
N=2169095.34
E=6224076.24
STA. 11+75.22
N=2169008.41
E=6223954.90
16" PAU INLET
556
560
564
568
572
576
580
584
588
556
560
564
568
572
576
580
584
588
9+50 10+00 11+00 12+00 13+00 STA=10+12 16" 90° BEND INV = 575.95

PROPOSED

PAU BERM
STA=10+12
16" 90° BEND
INV=581.66
DIP
PVC
TYP
CY111
30" RW
TOP=568.78
16" RW
TOP=569.48
36" x 30" CULVERT
TOP=572.06
36" x 30" CULVERT
TOP=571.95
STA:11+75.22

PAU INLET
INV=570.78
165 LF OF 16' PVC DR 18

RESTRAINED JOINTS REQ'D
STA:10+04.73
INV=581.83
STA=10+07.20
16" BFV
INV=581.83

EXISTING GRADE

PAU INLET
STA=10+22.82
16" 90° BEND
INV = 575.95
STA=10+93.06
STA=11+32.56
16" 45° BEND
INV = 575.95
STA=11+40.53
16" 45° BEND
INV = 568.45
16" 45° BEND
INV = 575.95
Plot Date: 4/6/2023 11:14:18 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
JM
91C07
29 CIVIL

PLAN AND PROFILE

PAU INLET YARD PIPING
8660F1091C07.dwg JDiDonato 8660F10
Know what's below.

Callbefore you dig.

KEY NOTES:

1. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.

2. REFER TO DRAWING 89M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL CROSSINGS PRIOR
TO CONSTRUCTION.

X
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
16" RW
30" RW
42" FE
36" FE

EX CULVERT
FILE:

PLAN
8660F1073C0801
FILE:

PROFILE
8660F1073C0801

EX DECHLORINATION

STRUCTURE

EX CAROUSEL

PUMP STATION
1 1 1

EX CHLORINE

CONTACT BASINS
FUTURE

CHLORINE

CONTACT BASIN
95S01
H
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:16:08-07'00'

Page 454 of 3073 ends

L7
L14
580
EC
EC
EC
EC
EC
EC
EC
13+93.35
10+00
11+00
12+00
13+00
STA. 11+21.22
N=2169159.94
E=6223780.02
Δ=45°00'00" RT
STA. 13+78.35
N=2169405.53
E=6223769.41
Δ=90° LT
STA. 11+56.26
N=2169187.03
E=6223802.25
Δ=45°00'00" LT
STA. 13+33.12
N=2169360.93
E= 6223785.66
Δ=11.25° LT
9+74 10+00
11+00
12+00
13+00
13+93.35
STA. 10+02.00
N=2169041.44
E=6223793.13
556
560
564
568
572
576
580
584
588
592
556
560
564
568
572
576
580
584
588
592
9+50 10+00 11+00 12+00 13+00 14+00 14+50 STA=10+02 INV - 570.20 12" EX UTILITY TOP=575.50 6" DRAIN TOP=572.61 2" EX UTILITY TOP=575.50 2" EX UTILITY TOP=575.50 4" SW TOP=575.19 14" BW TOP=573.69 24" FE TOP=576.03 4" DR TOP=574.92

EXISTING GRADE
STA=11+06.79
10" 45° BEND
INV = 566.68
TYP
CY111
STA=13+93.69

CONNECTION TOCHLORINATION FAC
INV = 571.00
42" SE
TOP = 568.00
24" WWTOP = 571.00
42" SCE
TOP = 568.00
394 LF OF 10" PVC DR 18

RESTRAINED JOINTS REQ'D

EXISTING

CHLORINATION

FACILITY
STA=13+33.12
10" 11.25° BEND
INV = 573.50
STA=13+78.35
10" 90° BEND ROLLED 45°
INV = 573.50

PAU PUMP

STATION
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.6±
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.4±
EX 12" UNK
INV=573.6±
2'X1.5' DUCTBANK
INV=573.3±

DUCT BANK (ASSUMED)
TOP=574.56
12" EX UTILITY
TOP=574.21
STA:13+02.00
10" BFV
INV=571.42
STA:13+22.00
10" CHECK VALVE
INV=571.47
STA=11+03.06
10" 45° BEND
INV = 570.20
STA=11+06.79
10" 45° BEND
INV = 566.68
STA=11+21.22
10" 45° BEND
INV = 566.68
STA=11+56.26
10" 45° BEND
INV = 566.68
STA=12+01.46
10" 45° BEND
INV = 566.66
STA=12+06
10" 45° BEND
INV = 571.19
Plot Date: 4/7/2023 9:33:50 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JDM
JM
91C08
30 CIVIL

PLAN AND PROFILE

PAU OUTLET YARD PIPING
8660F1091C08.dwg atucker 8660F10
Know what's below.

Callbefore you dig.

KEY NOTES:

1. REFER TO DRAWING 91M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.

2. SEE DETAIL P300/TYP FOR CONNECTION TO
EXISTING WET WELL. CONTRACTOR TO VERIFY

CONNECTION POINT AND SUPPORT ADJACENT
YARD PIPING WHILE EXCAVATING. CONNECTION

LOCATION SHOULD NOT INTERFERE WITH
EXISTING EFFLUENT FLOW TRANSMITTER.

3. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY OR PIPE
CROSSINGS PRIOR TO CONSTRUCTION.

X
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
STA. 13+93.65
N=2169400.29
E=6223755.35

CONNECTION TO

CHLORINATION FACILITY

EX STORM DRAIN PUMP

STATION (ABANDONED)
EX 4" RCW
EX 24" FE
EX 14" BW
(ABANDONED)
EX 4" FW

PAU PUMP

STATION INLET

EX BACKWASH

PUMP STATION

EX CHLORINE

CONTACT BASINS
EX 24" FE

EX DAFT BUILDING

EX CHEMICAL STORAGE
EX 42" SE
EX 24" WW

EX RECLAIMED

WATER FILTERS

EX AWT WET WELL

EX AWT FACILITY

PAU PUMP STATION
FILE:

PLAN
8660F1073C0801
FILE:

PROFILE
8660F1073C0801

EX CHLORINATION

FACILITY
TYP
MP532
(TYP)
3 3
3 3
91S03
E
1 2
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:16:23-07'00'

Page 455 of 3073 ends

580
584
588
592
596
600
604
608
612
580
584
588
592
596
600
604
608
612
A9+00 A10+00 A11+00 A12+00 A13+00 A14+00 A15+00 A16+00 A17+00 A18+00 A19+00

EXISTING GRADE
STA A10+18.60
INV=593.82
18" 22.5° BEND
STA A10+63.72
INV=590.91
18" 90° VERT BEND
STA A13+00.61
INV=596.62
18" 90° VERT BEND
STA A13+00.61
INV=590.91
18" 90° VERT BEND
EX 6" W
INV=599.3±

EX W
INV=600.6±
EX 6" SS
INV=593.8±
STA B10+62.22
CARV
STA A12+95.60

BLOW OFF
M-28
STA A10+05.00

METER TAP
STA A10+15.39
INV=593.90
18" X 16" RED
STA A17+76.16
INV=598.11
STA A10+63.72
INV=596.52
18" 90° VERT BEND
18" RW
STA A10+02.50
CARV
EX 16" RW
STA=A10+09.83
16" BFV
STA A10+14.54

METER TAP
STA=A13+10.84
18" BFV
S=-6.27%
S=-1.01%
S=-0.50%
S=-0.09%
STA A13+04.68CARV
STA A13+29.02
INV=596.61
18" 45° BEND
STA A13+72.15
INV=596.61
18" 45° BEND
EX 21" SS
INV=592.6±
STA A13+98.58
INV=596.60
18" 45° BEND
STA A15+28.29
INV=597.89

STATE (CALTRANS) ROW
227 LF OF 30" STEEL CASING
INSTALL 227 LF OF FPVC DR 18 INSTALL 318 LF OF FPVC DR 18 INSTALL 288 LF OF 18" PVC DR18 TYP
CY165
TYP
CY111
TYP
CY111
STA A10+00.00STA A16+12.00
EX 21" SS EX 15" SS
EX 18" W

EX T

EX E

EX OHW
EX 16" W

EX W
18" RW
STA A10+18.60
N=2186266.20
E=6222080.74
18" 22.5° BEND
STA A10+63.72
N=2186261.41
E=6222035.87
2-18" 90° VERT BEND
STA A13+00.61
N=2186263.25
E=6221798.99
2- 18" 90° VERT BEND
STA A13+29.02
N=2186283.34
E=6221778.91
18" 45° BEND
STA A13+72.15
N=2186283.34
E=6221735.78
18" 45° BEND
STA A13+98.58
N=2186302.04
E=6221717.09
18" 45° BEND
16" RW
STA A10+15.39
N=2186267.74
E=6222083.56
18" X 16" RED

EX OHW
A10+00
A11+00 A12+00
A13+00
A14+00
A15+00 A16+00 A17+00 A18+00 A19+00
STA A10+00
N=2186274.93
E=6222097.17
16" 90° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 9:34:29 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C01
31 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A09+40 TO A19+00
8660F1099C01.dwg JDiDonato 8660F10
4 REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
Know what's below.

Callbefore you dig.

BRU

BRUSH STREET
STATE HIGHWAY 101

REMOVE EX
16" RW LINE

RECEIVING PIT

JACKING PIT
TYP
CY745
3 5 1 1
2 PROPOSED METER

SERVICE LINE
REMOVE EX. CARV
3 WATER METER M-28
CARV
16" BFV
TYP
CY715
TYP
CARV CY745
TYP
CY745 CARV

BLOW OFF
TYP
CY733
TYP
18" BFV CY715
1 6
KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED

DEFLECTION CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 45

DEGREES

3. EXISTING WATER METER INSTALLED AS PART OF
PHASE 3 SCOPE, SHALL BE REUSED AND
REINSTALLED DURING PHASE 4 CONSTRUCTION.

4. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.

5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND 8.7 DEGREES.

6. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 6.5
DEGREES.

GENERAL NOTES:

1. SEE RECYCLED WATER PROJECT PHASE 1 TO 3
PLANS FOR EXISTING RW PIPE ALIGNMENT.

2. CONTRACTOR TO DETERMINE FINAL LAUNCHING
AND RECEIVING PIT SIZE.

3. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

4. CONTRACTOR TO ASSUME THAT ANY VERTICAL

BENDS SHOWN ON THE PLANS ARE ROTATED

FROM THE CORRESPONDING HORIZONTAL BENDS
UNLESS NOTED OTHERWISE.

INSTALL 16 LF OF 16"
FPVC DR 18
INSTALL 51 LF OF 18" FPVC DR 18

N ORCHARD AVE
MATCH LINE STA A19+00 SEE DWG 99C02
TYP
CY111
TYP
CY165
TYP
CY111
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:22-07'00'

Page 456 of 3073 ends

EX 15" SS
A19+00 A20+00 A21+00 A22+00
A23+00
A24+00 A25+00 A26+00 A27+00
A28+00 A29+00
EX 15" SS
EX 12" W

EX W EX OHW

EX W
EX 6" SS

EX G

EX OHW

EX OHW

EX OHW

EX W

EX W
EX 15" SS EX OHW
EX 16" W

EX OHW
EX 6" SS

EX W
EX 16" W
STA A22+90.95
N=2186305.00
E=6220826.65
18" 45° BEND
STA A22+84.34
N=2186300.33
E=6220831.34
18" 45° BEND
STA A27+73.29
N=2186304.07
E=6220344.32
18" 22.5° BEND
STA A27+88.13
N=2186298.36
E=6220330.61
18" 22.5° BEND
18'' RW
TYP
CARV CY745

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
588
592
596
600
604
608
612
616
588
592
596
600
604
608
612
616
A19+00 A20+00 A21+00 A22+00 A23+00 A24+00 A25+00 A26+00 A27+00 A28+00 A29+00

EXISTING GRADE

EX W
INV=603.4±

EX W LATERAL
INV=606.2±

EX W LATERAL
INV=606.3±
EX 6" SS
INV=597.6±
EX 15" SS
INV=597.4±
EX 6" SS
INV=598.8±

EX GAS
INV=607.1±

EX GAS
INV=607.1±

EX W
INV=607.2±
INSTALL 1000 LF OF 18" PVC DR 18
TYP
CY111
STA A27+73.29
INV=602.59
18" 22.5° BEND
STA A24+50.14
CARV
18" RW
STA A22+52.00STA A23+24.00

RESTRAINED

JOINTS REQ'D
STA A27+57.00STA A28+05.00

RESTRAINED

JOINTS REQ'D
S=-0.50%
S=-1.19%
S=-2.07%
S=-0.20%
S=-0.05%
STA A21+49.42
INV=599.99
STA A22+84.34
INV=600.06
18" 45° BEND
STA A22+90.95
INV=600.07
18" 45° BEND
STA A24+48.88
INV=601.94
STA A27+88.13
INV=602.90
18" 22.5° BEND
Plot Date: 4/6/2023 9:28:19 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C02
32 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A19+00 TO STA A29+00
8660F1099C02.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA 19+00 SEE DWG 99C01
MATCH LINE STA 29+00 SEE DWG 99C03
1 1 1 1 1
2 KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED

DEFLECTION CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. LOCATE ARV MINIMUM 15 FEET FROM SANITARY
SEWER.

GENERAL NOTES:

1. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

ORR STREET
#

BRUSH STREET

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:39-07'00'

Page 457 of 3073 ends

EX 15" SS
EX 6" SS
EX 15" SS
A29+00 A30+00
A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00
EX 12" RW
EX 12" W EX OHW

EX OHW

EX OHW

EX T

EX W

EX T

EX E EX T
EX 15" SS

EX E

EX OHW

EX E

EX T

EX OHW
EX 12" W

EX OHW

EX OHW

EX T

EX T
EX 10"x18" SD
EX 12" SS

EX W
STA A33+84.31
N=2186280.61
E=6219741.18
2-18" 90° VERT BEND
STA A32+26.17
N=2186280.65
E=6219899.32
2-18" 90° VERT BEND
STA A30+36.30
N=2186296.93
E=6220082.45
18" 45° BEND
STA A30+59.21
N=2186280.70
E=6220066.28
18" 45° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
592
596
600
604
608
612
616
620
624
592
596
600
604
608
612
616
620
624
A29+00 A30+00 A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00

EXISTING GRADE
144.99 LF OF 30" STEEL CASING
TYP
CY165

NORTH COAST

RAILWAY AUTHORITY
STA A29+28.30
INV=605.79
EX 15" SS
INV=597.7±
EX 6" SS
INV=604.9±
STA A32+26.17
INV=606.80
18" 90° VERT BEND
STA A33+84.31
INV=605.10
18" 90° VERT BEND
EX 18" SD
INV=610.5±

EX W
INV=609.7±

EX T
INV=611.7±

EX GAS
INV=608.6±

EX W LATERAL
INV=608.2±

EX T
INV=608.1±

EX W
INV=609.0±

EX GAS
INV=609.4±

EX GAS
INV=610.5±

EX W
INV=613.2±
EX 12" SS
INV=600.8±
EX 12" SS
INV=601.2±
STA A33+81.77

BLOWOFF
160 LF OF EX 12" DR18
STA A32+24.00
CARV
STA A35+40.02
CARV
STA A37+39.00

BLOW OFF
18'' RW
EX 15 ' SS
INV=601.9±
EX 18" SD
INV=608.5±
S=-0.34%
S=0.91%
STA A30+36.30
INV=606.16
18" 45° BEND
STA A30+59.21
INV=606.23
18" 45° BEND
STA=A31+79.82
18" BFV
STA A32+26.17
INV=598.24
18" 90° VERT BEND
STA A33+84.31
INV=598.24
18" 90° VERT BEND
STA=A34+19.82
18" BFV
STA A35+39.82
INV=605.10
STA A37+40.40
INV=603.67
18" x 12" RED

TIE-IN TO

EXISTING LINE
S=-0.08%
STA A37+00.00
INV=603.65
Plot Date: 4/7/2023 9:51:18 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C03
33 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A29+00 TO STA A39+00
8660F1099C03.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

JACKING PIT

RECEIVING PIT
MATCH LINE STA 29+00 SEE DWG 99C02MATCH LINE STA 39+00 SEE DWG 99C04 2 2
3 TIE-IN TO EXISTING
12" RW PIPELINE
4 4
INSTALL 321 LF OF 18" FPVC DR 18
STA A29+11
STA A37+40
TYP
CY745 CARV
18" BFV
TYP
CY715
BLOW

TYP OFF
CY733
18" BFV
TYP
CY715
CARV
TYP
CY745
BLOW

TYP OFF
CY733
1 KEY NOTES:

1. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT INFORMATION. CONTRACTOR SHALL

CONFIRM EXISTING JOINT RESTRAINT PRIOR TO
OPEN CUT EXCAVATION. IF JOINT RESTRAINT IS

NOT PRESENT, CONTRACTOR SHALL INSTALL
JOINT RESTRAINTS OF SUFFICIENT LENGTH.

2. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

3. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.

4. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION.

5. REMOVE EXISTING CAP.

GENERAL NOTES:

1. CONTRACTOR TO DETERMINE FINAL JACKING
AND RECEIVING PIT SIZE.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

3. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

BRUSH STREET
5 INSTALL 11 LF OF 18" PVC DR 18
INSTALL 145 LF OF 18" FPVC DR 18 INSTALL 362 LF OF 18" FPVC DR 18

MAZZONI STREET

THIS SHEET
2 5
TYP
CY165
TYP
CY111
TYP
CY111 TYP
CY111
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:07:53-07'00'

Page 458 of 3073 ends

EX 12" SS
EX 16"X29" SS
EX 10"X18" SD
EX 6" SS
A39+00 A40+00 A41+00
A42+00 A43+00 A44+00
EX 12" RW A45+00 A46+00 A47+00 A48+00 A49+00
EX 12" W
EX 18" SD

EX W EX T EX OHW
EX 10" SS

EX W

EX W
EX 6" SS

EX OHW

EX OHW EX OHW
EX 6" SS

EX OHW
EX 16" W

EX G

EX T EX W EX W

EX OHW

EX E

EX OHW
STA A44+09.91
N=2186293.39
E=6218725.04
18" 45° BEND
STA A44+30.23
N=2186278.96
E=6218710.47
18" 45° BEND
18" RW
STA A43+93.86
N=2186293.20
E=6218741.08
18" x 12" RED

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
616
620
624
628
632
636
640
644
648
616
620
624
628
632
636
640
644
648
A39+00 A40+00 A41+00 A42+00 A43+00 A44+00 A45+00 A46+00 A47+00 A48+00 A49+00

EXISTING GRADE
EXISTING 12" CITY LINE EXTENDS
BELOW DRAWING DATUM (NOTE 1)
EX 12" SS
INV=628.0±

EX E
INV=616.4±

EX GAS
INV=624.6±

EX W LATERAL
INV=625.0±

EX W LATERAL
INV=626.6±

EX W LATERAL
INV=627.3±
EX 6" SS
INV=627.7±

EX GAS
INV=628.3±

EX W
INV=628.4±
EX 6" SS
INV=630.1±

EX W LATERAL
INV=630.2±

EX E
INV=631.7±
EX 6" SS
INV=634.5±

EX W LATERAL
INV=634.8±

EX W LATERAL
INV=636.0±

EX E
INV=636.1±

EX W LATERAL
INV=636.6±

EX GAS
INV=636.6±

EX W LATERAL
INV=637.6±

EX W LATERAL
INV=638.4±

EX W LATERAL
INV=639.0±

EX W LATERAL
INV=639.2±

EX GAS
INV=639.2±
INSTALL 506 LF OF 18" PVC DR 18
TYP
CY111

RESTRAINED JOINTS REQUIRED
STA A47+77.30
CARV
S=-2.39%
S=-1.26%
490 LF OF EX 12" PVC
STA A43+96.00
CARV
STA A43+93.86
INV=630.83
18" x 12" RED

TIE-IN TO

EXISTING RW LINE
STA A44+09.91
INV=630.85
18" 45° BEND
STA A44+30.23
INV=630.85
18" 45° BEND
STA=A44+59.82
18" BFV
STA A45+86.92
INV=634.61
STA A47+25.36
INV=636.36
STA A47+77.12
INV=636.36
S=-1.72%
Plot Date: 4/7/2023 9:52:35 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C04
34 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A39+00 TO STA A49+00
8660F1099C04.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A39+00 SEE DWG 99C03
MATCH LINE STA A49+00 SEE DWG 99C05
2 1 1 1

EXISTING WATER VALVE -

CONTRACTOR TO VERIFY

LOCATION
CARV
TYP
CY745
18" BFV
TYP
CY715
CARV
TYP
CY745
4 5
KEY NOTES:

1. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL CONFIRM

EXISTING JOINT RESTRAINT PRIOR TO OPEN CUT
EXCAVATION. IF JOINT RESTRAINT IS NOT

PRESENT, CONTRACTOR SHALL INSTALL JOINT
RESTRAINTS OF SUFFICIENT LENGTH.

3. REMOVE EXISTING CAP.

4. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT AND PIPE INFORMATION.

5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. SEE CITY AS BUILTS FOR EXISTING 12 INCH RW
ALIGNMENT AND PIPE INFORMATION.

2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

3. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3 STA A43+95
STA A49+80

LOW GAP RD

N STATE ST

EX E EX G

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:08-07'00'

Page 459 of 3073 ends

A49+00
A50+00
A51+00
A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00 B10+00
B11+00
C10+00
C11+00
C12+00
EX 8" SS
EX 8" SS EX 6" SS
EX 12" SS
EX 8" SS
EX 12" SD
EX 6" SS EX 18" SD

EX E

EX T

EX OHW
EX 6" SS
EX 16" W

EX W

EX OHW

EX E

EX CATV

EX T
EX 10" W

EX E

EX G
EX 6" SS
EX 12" W

EX OHW

EX W

EX E

EX T

EX E

EX T
EX 16" W
EX 8" W EX E
STA A51+26.74
N=2186297.53
E=6218023.16
18" 11.25° BEND
18" RW
STA A57+58.79
N=2186489.35
E=6217421.45
18"x6" RED WYE
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
10'' RW
12" RW
6" RW
EX 12" SS
STA A49+97.45
N=2186275.60
E=6218143.26
18" 45° BEND
STA A50+29.13
N=2186297.91
E=6218120.77
18" 45° BEND
STA A51+99.29
N=2186311.12
E=6217951.84
18" 11.25° BEND

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
628
632
636
640
644
648
652
656
660
628
632
636
640
644
648
652
656
660
A49+00 A50+00 A51+00 A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00

EXISTING GRADE
STA A51+26.74
INV=638.55
18" 11.25° BEND
STA A57+58.79
INV=643.79
18"x6" RED WYE

EX W
INV=639.7±

EX T
INV=638.3±

EX GAS
INV=640.1±

EX E
INV=640.5±
EX 8" SS
INV=639.2±

EX GAS
INV=640.2±

EX W LATERAL
INV=640.5±
EX 12" SS
INV=635.0±

EX E
INV=640.6±

EX W LATERAL
INV=641.8±

EX W LATERAL
INV=642.8±
EX 2" GAS
INV=643.4±
STA A49+96.00

BLOW OFF
EX 6" W
INV=644.0±

EX GAS
INV=644.6±
EX 6" W
INV=646.2±
EX 6" SS
INV=646.4±
EX 2" GAS
INV=646.8±
EX 2" GAS
INV=647.5±

EX W LATERAL
INV=647.0±

EX GAS
INV=646.8±
STA A57+45.96
CARV

EX COMM
INV=648.5±
EX 18" SD
INV=648.5±

EX E
INV=649.3±
EX 8" W
INV=647.9±
EX 8" SS
INV=648.8±
EX 10" W
INV=646.9±

EX E
INV=646.1±

EX GAS
INV=648.2±
TYP
CY111
STA A51+99.29
INV=639.82
18" 11.25° BEND
S=-6.21%
S=-1.79%
S=-1.04%
S=-1.72%
S=-0.51%
S=-0.31% S=0.06%
STA A49+60STA A50+60STA A51+18STA A51+35STA A51+90STA A52+10

EX G
INV=640.0±

EX G
INV=640.0±
STA A55+20
STA A49+97.45
INV=632.58
18" 45° BEND
STA A50+29.13
INV=632.58
18" 45° BEND
STA A54+59.82
INV=642.51
STA A56+39.82
INV=643.42
STA=A57+39.82
18" BFV
STA A57+75.22
INV=643.84
18"x12" RED TEE
STA A58+13.22
INV=643.82
18" x 10" RED
STA A58+69.82
INV=644.13
S=0.08% S=0.06%

RESTRAINED JOINTS REQ'D
INSTALL 914 LF OF 18" PVC DR18
INSTALL 87 LF OF 10" PVC DR18

RESTRAINED

JOINTS REQ'D

RESTRAINED

RESTRAINED JOINTS REQ'D JOINTS REQ'D
Plot Date: 4/6/2023 9:33:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C05
35 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A49+00 TO STA A59+00
8660F1099C05.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
MATCH LINE STA A59+00 SEE DWG 99C06
MATCH LINE STA A49+00 SEE DWG 99C04
Know what's below.

Callbefore you dig.

TYP
CY111
CARV
TYP
CY745
18" BFV
TYP
CY715
BLOW

OFF TYP
CY733
2 KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING. N BUSH ST

N PINE ST

N OAK ST
ELM ST

LOW GAP RD
EX 12" SS

EX G

EX OHW

EX W

THIS SHEET
2 2 2 1 1 1
3 3
3 3
3 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:22-07'00'

Page 460 of 3073 ends

A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00 EX 18" SD
EX 12" SS
EX 6" W

EX T

EX E EX E

EX T EX 8" W

EX G EX OHW

EX W

EX OHW

EX E EX OHW EX 6" W

EX G

EX E EX T
10" RW EX 8" W

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00

EXISTING GRADE

EX W LATERAL
INV=648.8±

EX W LATERAL
INV=648.8±

EX W LATERAL
INV=648.8±

EX W
INV=648.4±

EX W
INV=648.5±

EX W LATERAL
INV=648.5±
EX 6" W
INV=648.0±

EX W LATERAL
INV=648.2±

EX GAS
INV=647.7±

EX GAS
INV=647.5±

EX W LATERAL
INV=647.6±
EX 18" SD
INV=648.1±

EX E
INV=649.5±

EX W LATERAL
INV=648.6±

EX W
INV=650.9±

EX E
INV=653.8±

EX COMM
INV=654.4±
EX 6" SS
INV=642.3±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
S=-0.16%
S=-0.98%
S=-0.77%
S=-2.75%
S=-3.16%
STA A62+36.40
INV=644.71
STA A64+45.81
INV=646.76
STA A66+59.03
INV=648.40
STA A67+79.03
INV=651.71
STA A59+62.00

RESTRAINED

JOINTS REQ'D
Plot Date: 4/7/2023 9:54:00 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C06
36 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A59+00 TO STA A69+00
8660F1099C06.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A59+00 SEE DWG 99C05
MATCH LINE STA A69+00 SEE DWG 99C07
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.

LOW GAP RD

N BUSH ST

COTTAGE LN

THIS SHEET
1 1 1 1
2 3
2 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:38-07'00'

Page 461 of 3073 ends

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00 EX 12" SS
EX 18" SD
EX 8" W EX OHW

EX E
EX 6" SS

EX E

EX T

EX G EX E

EX OHW EX W

EX OHW

EX W

EX W

EX W

EX OHW EX OHW EX OHW EX T

EX T

EX T

EX T
10'' RW
644
648
652
656
660
664
668
672
676
644
648
652
656
660
664
668
672
676
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00

EXISTING GRADE

EX W LATERAL
INV=661.4±

EX COMM
INV=667.5±

EX COMM
INV=667.8±
EX 18" SD
INV=666.8±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
STA A70+01.12
CARV
M-403
STA A70+68.30

METER TAP
STA A69+73.00
STA A72+27.00

RESTRAINED JOINTS REQ'D
S=-1.23%
S=-3.16%
S=-0.87%
S=-0.61%
S=-0.71%
STA A70+00.15
INV=658.69
STA=A70+99.82
10" GV
STA A71+59.03
INV=660.65
STA A73+29.03
INV=662.12
STA A78+49.42
INV=665.30
Plot Date: 4/7/2023 9:56:16 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
JM
99C07
37 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A69+00 TO STA A79+00
8660F1099C07.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A69+00 SEE DWG 99C06
M-403
MATCH LINE STA A79+00 SEE DWG 99C08

WATER METER
CARV
TYP
CY745
TYP
CY901
10" GV
TYP
CY716
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

LOW GAP RD

THIS SHEET
1 1 1 1
2 2
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:08:52-07'00'

Page 462 of 3073 ends

660
664
668
672
676
680
684
688
692
660
664
668
672
676
680
684
688
692
A79+00 A80+00 A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00

EXISTING GRADE
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111

EX GAS
INV=668.2±

EX COMM
INV=669.5±

EX E
INV=669.6±

EX COMM
INV=669.6±
STA A82+60.00
INV=677.48
STA A83+50.00
INV=679.83
STA A84+70.00
INV=681.12
STA A87+20.00
INV=682.47
STA A87+20.00
CARV
M-404
STA A87+86.48

METER TAP
S=-0.71% S=-6.43%
S=-4.32%
S=-2.61%
S=-1.08%
S=-0.54%
S=-0.18% S=-0.18%

RESTRAINED JOINTS REQ'D
STA=A88+59.82
10" GV
RESTRAINED JOINTS REQ'D STA A80+05.15 INV=666.40 10" 90° BEND STA A80+18.19 INV=667.14 10" 11.25° BEND STA A79+60.00
STA A80+50.00STA A87+30.00
A79+00
A80+00
A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00 EX 6" SS
EX 8" W

EX CATV

EX E

EX T

EX G

EX CATV
EX 8" W

EX E

EX T

EX E

EX OHW
10'' RW
STA A80+05.15
N=2187204.12
E=6215291.84
10" 90° BEND
STA A80+18.19
N=2187216.29
E=6215296.52
10" 11.25° BEND

EX G
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 10:02:34 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C08
38 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A79+00 TO STA A89+00
8660F1099C08.dwg JDiDonato 8660F10
M-404
WATER
METER

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A79+00 SEE DWG 99C07
MATCH LINE STA A89+00 SEE DWG 99C09
TYP
CY901
CARV
TYP
CY745 10" GV
TYP
CY716
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

DESPINA DR

LOW GAP RD

THIS SHEET
2 2 1 1 1 1
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:07-07'00'

Page 463 of 3073 ends

A89+00 A89+55.99
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
668
672
676
680
684
688
692
696
700
668
672
676
680
684
688
692
696
700
A89+00 A90+00 A90+40

EXISTING GRADE
10 INCH

RESTRAINED
CAP
M-405
STA A89+54.00

METER TAP
STA A89+56.01
INV 682.89
STA A89+50.00
CARV
Plot Date: 4/7/2023 8:45:47 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C09
39 CIVIL

PLAN AND PROFILE ALIGNMENT A
STA A89+00 TO STA A89+55.99
8660F1099C09.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA A89+00 SEE DWG 99C08
M-405

WATER METER TYP
CY901
INSTALL 58 LF OF
10" PVC DR18

RESTRAINED

JOINTS REQUIRED
CARV
TYP
CY745
GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

STA A89+58

DESPINA DR
TYP
CPY111

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:22-07'00'

Page 464 of 3073 ends

A57+00
A58+00
A59+00
C10+00
EX 8" SS EX 12" SD
EX 12" SD EX 12" SD
EX 12" SS
EX 6" SS
EX 12" SS
EX 8" SS
EX 18" SD
EX 8" W

EX CATV

EX T

EX E

EX E

EX E

EX CATV

EX T EX G EX E

EX G

EX E
STA B10+18.72
N=2186506.10
E=6217413.11
6" 11.25° BEND
STA B10+00
N=2186489.35
E=6217421.45
18"x6" RED WYE
B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
B9+00 B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00 STA B10+00 INV=643.79 18"x6" RED WYE

EXISTING GRADE

EX E
INV=648.6±
EX 12" SD
INV=648.6±
EX 6" W
INV=647.8±

EX CATV
INV=649.4±

EX COMM
INV=649.6±

EX E
INV=650.0±

EX E
INV=651.4±

EX GAS
INV=654.0±

EX E
INV=655.2±
STA A14+84.40
INV=649.47
STA A18+25.90
INV=651.50
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA B18+25.90
CARV
S=-1.18%
S=-0.59%
S=0.97%
STA B10+09.94

BLOW OFF

RESTRAINED JOINTS REQ'D

RESTRAINED

JOINTS REQ'D
STA B10+00.00STA B10+60.00
STA B10+18.72
INV=644.290
6" 11.25° BEND
STA=B10+606" GV
STA B18+90.00
Plot Date: 4/7/2023 10:04:51 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C10
40 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B9+00 TO STA B19+00
8660F1099C10.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA B19+00 SEE DWG 99C11
1 1
BLOW

OFF TYP
CY733
6" GV
TYP
CY716

BIKE LANE STRIPING
CARV
TYP
CY745
2 N BUSH ST

LOW GAP RD

THIS SHEET
KEY NOTES:

1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:37-07'00'

Page 465 of 3073 ends

640
644
648
652
656
660
664
668
672
640
644
648
652
656
660
664
668
672
B19+00 B20+00 B21+00 B22+00 B23+00 B24+00 B25+00 EX COMM INV=654.6± EX W LATERAL INV=651.2± EX W LATERAL INV=650.6± EX W LATERAL INV=650.2± EX W LATERAL INV=649.6± EX W LATERAL INV=649.2± STA B22+69.11 INV=647.182 6" 90° BEND STA B23+88.90 INV=647.710 6" 11.25° BEND STA B22+69.00 BLOW OFF INSTALL 516 LF OF 6" PVC DR18
TYP
CY111

EXISTING GRADE
M-402
STA B19+70.00

METER TAP
STA B19+94.81
INV=650.090
6" 45° BENDSTA B24+16.24
INV=648.310
6" RESTRAINED CAP
6" RW

EX GAS
INV=652.2±
S=1.06%
S=0.44%
S=2.20%

RESTRAINED JOINTS REQUIRED

RESTRAINED

JOINTS REQUIRED

RESTRAINED

JOINTS REQUIRED
S=0.96%
STA B19+71.65
INV=650.090
6" 45° WYE
STA=B20+406" GV
M-401
STA B24+13.00

METER TAP
STA B24+16.00CARV
STA B21+20.00STA B22+40.00STA B23+00.00STA B23+35.00STA B24+16.00

EX G

EX T

EX G
EX 8" W EX G

EX G
EX 6" SS
EX 6" W
EX 8" W

EX G EX 6" SS

EX G EX 6" W

EX G
STA B19+71.65
N=2187447.98
E=6217274.06
6" 45° WYE
STA B19+94.81
N=2187465.23
E=6217289.50
6" 45° BEND
STA B22+69.11
N=2187485.50
E=6217563.05
6" 90° BEND
STA B23+88.90
N=2187366.08
E=6217572.50
6" 11.25° BEND
6" RW
6" RWB24+16.34
B18+00 B19+00
B20+00 B21+00 B22+00
B23+00
B24+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 8:47:31 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C11
41 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA B19+00 SEE DWG 99C10
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C11
41 CIVIL

PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10
M-401
WATER
METER
TYP
CY901
M-402
WATER

METER TYP
CY901
6" RESTRAINED CAP
6" GV
TYP
CY716
BLOW

TYP OFF
CY733
CARV
TYP
CY745
6" RESTRAINED CAP
2222
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

ARLINGTON DR LOCKWOOD DR

N BUSH ST

N PINE ST

THIS SHEET
3 3
3 3
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:09:53-07'00'

Page 466 of 3073 ends

19+00 0+0 11+0 12+00 13+00 14+00 14+41.55

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
624
628
632
636
640
644
648
652
656
624
628
632
636
640
644
648
652
656
C9+00 C10+00 C11+00 C12+00 C13+00 C14+00 C15+00 C16+00 C17+00 C18+00 C19+00 TYP
CY111

EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18

RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQUIRED
S=0.37% S=0.41% S=0.39%
S=1.18%
S=2.83%
S=2.96%
S=10.69%
S=0.12% S=0.03% S=0.91%
S=0.56%
EX 6" SS
INV=633.7±
EX 8" SS
INV=647.7±
EX 12" W
INV=647.4±

EX E
INV=649.1±

EX GAS
INV=647.8±

EX COMM
INV=648.2±

EX W (HYD)
INV=646.3±

EX COMM
INV=646.3±

EX GAS
INV=646.0±

EX W (HYD)
INV=644.2±

EX W (HYD)
INV=638.9±

EX W
INV=638.2±

EX GAS
INV=638.1±
EX 18" SD
INV=635.5±
EX 12" SD
INV=635.5±
EX 6" SS
INV=639.6±
STA C11+40.61
INV=643.56
STA C11+20.00
CARV
STA C16+12.37
CARV
M-406
STA C16+50.00

METER TAP
STA C10+62.34
INV=643.70
12" 45° BEND
STA C14+60.64
INV=638.79
STA C16+45.06
INV=630.89
12" 11.25° BEND
STA C16+56.80
INV=630.89
12" 45° BEND
STA C16+79
12" GV
STA C17+00.15
INV=630.90
12" 45° BEND
STA C17+38.60
INV=631.06
STA C18+00.15
INV=630.33
12" 90° BEND
STA C12+55.00STA C15+29.00STA C18+55.40
STA C11+01.05
12" GV
STA C16+15.05
INV=634.04
12" 90° BEND
STA C10+00.00 STA C10+00.00
INV=643.92
18"x12" RED TEE
STA C14+00.60
INV=640.49
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
STA C10+62.34
N=2186435.49
E=6217386.03
12" 45° BEND
STA C16+15.05
N=2185892.41
E=6217488.66
12" 90° BEND
STA C16+56.80
N=2185885.48
E=6217447.51
12" 45° BEND
STA C17+00.15
N=2185850.03
E=6217422.56
12" 45° BEND
STA C18+00.15
N=2185832.92
E=6217324.03
12" 90° BEND
C10+00
C11+00
C12+00
C13+00
C14+00
C15+00
C16+00
C17+00
C18+00
C19+00
B10+00
A55+00 A56+00 A57+00 A58+00
EX 12" SS
EX 6" SS
EX 6" SS
EX 12" SD
EX 18" SD
EX 18" SD

EX T

EX G

EX OHW
EX 16" W

EX W

EX W

EX W

EX W

EX W

EX OHW

EX OHW

EX OHW

EX W

EX W

EX G

EX OHW
EX 6" SS

EX W

EX OHW
EX 18" SD
EX 6" SS
12" RW
12" GV
Plot Date: 4/7/2023 5:15:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C12
42 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C10+00 TO STA C19+00
8660F1099C12.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

M-406
WATER
METER
2 TYP
CY901
CARV
TYP
CY745
CARV
TYP
CY745
12" GV
TYP
CY716
1 KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

3. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
MATCH LINE STA C19+00 SEE DWG 99C13

LOW GAP RD

N BUSH ST

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
TYP
CY716
4 3
5 2 2 1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:13-07'00'

Page 467 of 3073 ends

620
624
628
632
636
640
644
648
652
620
624
628
632
636
640
644
648
652
C19+00 C20+00 C21+00 C22+00 C23+00 C24+00 C25+00 C26+00 C27+00 C28+00 C29+00 S=0.56% S=-0.58%
S=-0.82%
S=-0.01% S=0.01% S=0.01%
S=1.36%
STA C21+26.74
INV=628.65
12" 90° BEND
STA C21+36.62
INV=628.70
12" 11.25° BEND
STA C25+25.51
INV=631.90
12" 11.25° BEND
STA C25+98.71
12" GV
STA C27+44.72
INV=631.90
12" 11.25° BEND
STA C27+65.60
INV=631.90
EX 18" SD
INV=633.0±
STA C21+24.73

BLOW OFF

EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18

RESTRAINED JOINTS REQ'D
STA C20+74.00STA C21+82.00

RESTRAINED JOINTS REQ'D
STA C24+49.00STA C27+70.00
STA C27+40.00
CARV
M-407
STA C24+80.00

METER TAP
TYP
CY111
STA C25+25.51
N=2185532.67
E=6216981.94
12" 11.25° BEND
STA C27+44.72
N=2185588.20
E=6216769.88
12" 11.25° BEND
C24+00
C25+00
C26+00 C27+00
C28+00
C29+00
STA C21+26.74
N=2185511.15
E=6217379.91
12" 90° BEND
STA C21+36.62
N=2185509.63
E=6217370.14
12" 11.25° BEND
12" RW 12" RW
C18+00
C19+00
C20+00
C21+00
C22+00
C23+00
C24+00
9+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 5:29:43 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C13
43 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C19+00 TO STA C29+00
8660F1099C13.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
MATCH LINE STA C23+40 SEE LEFT
MATCH LINE STA C19+00 SEE DWG 99C12
Know what's below.

Callbefore you dig.

MATCH LINE STA C23+40 SEE RIGHT
MATCH LINE STA C29+00 SEE DWG 99C14
KEY NOTES:

1. APPROXIMATE SD LOCATION AND ELEVATION
BASED ON CITY GIS MAP. OUTFALL TO CREEK
WAS NOT FOUND IN THE FIELD. CONTRACTOR TO
FIELD VERIFY PRIOR TO CONSTRUCTION.

2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
#
BLOW

OFF TYP
CY733
M-407
WATER
METER
TYP
CY901
1 EX-18" SD
TYP
CY715
CARV
TYP
CY745
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:30-07'00'

Page 468 of 3073 ends

624
628
632
636
640
644
648
652
656
660
624
628
632
636
640
644
648
652
656
660
C29+00 C30+00 C31+00 C32+00 C33+00 C34+00 C35+00 C36+00 C37+00 C38+00 C39+00 STA C29+96.23 INV=629.60 12" 22.5° BEND STA C30+10.59 INV=635.19 12" 22.5° BEND STA C32+16.94 INV=635.19 12" 22.5° BEND STA C33+25 INV=635.19 12" 90° BEND STA C33+25 INV=643.40 12" 90° BEND STA C34+30 INV=643.40 12" 90° BEND STA C34+30 INV=637.17 12" 90° BEND STA C35+34.79 INV=639.32 12" 11.25° BEND STA C38+50.21 INV=646.50 12" 11.25° BEND STA C29+35.18 INV=629.60 STA C34+71.65 INV=637.18 STA C35+74.21 INV=640.68 STA C36+62.55 INV=645.67 STA C37+14.75 INV=646.50 STA C29+75.00 BLOW OFF TYP
INSTALL 405 LF OF 12" PVC DR18 CY111

RESTRAINED JOINTS REQ'D
STA C31+75.00STA C35+80.00

RESTRAINED JOINTS REQ'D
STA C38+09.00
S=1.36% S=0.00% S=0.00%
S=-41.14%
S=0.00% S=0.00%
S=0.00%
S=-0.03%
S=-3.41%
S=-3.49%
S=-5.65%
S=-1.59%
S=0.00%
S=-19.86%
INSTALL 147 LF OF 12" DIP PC350 INSTALL 448 LF OF 12" PVC DR18 TYP
CY111

EXISTING GRADE
STA C33+05.00

PVC TO DI TRANSITION
STA C34+52.00
PVC TO DI TRANSITION STA C34+60.00

BLOW OFF
STA C29+55.64
INV=629.60
12" 22.5° BEND

RESTRAINED JOINTS REQ'D
STA C29+44.00STA C30+55.00
11+00
LIVE
OAK
AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
C29+00
C30+00
C31+00
C32+00
C33+00
C34+00
C35+00
C36+00 C37+00 C38+00 C39+00
STA C32+16.94
N=2185714.69
E=6216324.27
12" 22.5° BEND
STA C35+34.79
N=2185714.69
E=6216006.42
12" 11.25° BEND 12" RW
STA C29+55.64
N=2185600.56
E=6216559.32
12" 22.5° BEND
Plot Date: 4/7/2023 6:13:17 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C14
44 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C29+00 TO STA C39+00
8660F1099C14.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832

THIS SHEET
Know what's below.

Callbefore you dig.

MATCH LINE STA C29+00 SEE DWG 99C13
KEY NOTES:

1. HORIZONTAL BEND ACHIEVED BY ROTATING DUAL
90 DEGREE VERTICAL BENDS.

2. REFER TO SHEET 99S12 FOR BRIDGE, ABUTMENT,
AND PIPE CONNECTION DETAILS.

3. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
#
GENERAL NOTES:

1. NOT USED.

BLOW

OFF TYP
CY733
BLOW

OFF TYP
CY733
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
MATCH LINE STA C39+00 SEE DWG 99C15
2 3
3 3 3 3
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:10:45-07'00'

Page 469 of 3073 ends

648
652
656
660
664
668
672
676
680
684
648
652
656
660
664
668
672
676
680
684
C39+00 C40+00 C41+00 C42+00 C43+00 C44+00 C45+00 C46+00 C47+00 C48+00 C49+00 STA C39+63.47 INV=669.00 12" 11.25° BEND STA C39+77.40 INV=669.00 12" 45° BEND STA C40+14.21 INV=669.00 12" 45° BEND STA C40+56.63 INV=669.00 12" 11.25° BEND STA C40+86.72 INV=663.74 12" 22.5° BEND STA C41+52.61 INV=650.66 12" 11.25° BEND STA C41+58.52 INV=650.64 12" 11.25° BEND STA C43+18.76 INV=653.64 12" 11.25° BEND STA C40+00.00 CARV STA C45+23.97 INV=660.13 12" 11.25° BEND STA C45+33.66 INV=660.42 12" 11.25° BEND STA C45+75.21 INV=670.02 12" 11.25° BEND STA C45+84.50 INV=670.02 12" 11.25° BEND STA C46+68.39 INV=670.02 12" 90° BEND STA C48+81.67 INV=676.50 12" 90° BEND EX 6" SS INV=674.4± EX GAS INV=679.0± EX 8" SS INV=673.0± EX 6" UTIL INV=653.7± STA C39+90 12" GV STA C42+60.00 BLOW OFF STA C48+89.90 CARV TYP
INSTALL 1000 LF OF 12" PVC DR18 CY111

RESTRAINED JOINTS REQ'D
STA C41+65.00
STA C42+24.39
INV=650.67

EXISTING GRADE
S=-19.86%
S=0.00%
S=18.22%
S=19.98%
S=0.40%
S=-0.00%
S=-3.16%
S=-3.18%
S=-3.29%
S=-23.15%
S=0.16% S=0.00%
S=-3.50%
S=-2.76%
STA C47+55.92
INV=673.06
S=0.02%

RESTRAINED JOINTS REQ'D
STA C43+10.00STA C43+25.00

RESTRAINED JOINTS REQ'D
STA C45+15.00STA C47+25.00
RESTRAINED JOINTS REQ'D STA C48+25.00
M-408
STA C39+30.00
METER TAPM-409
STA C46+35.00

METER TAP
STA C39+77.40
N=2185817.96
E=6215576.02
12" 45° BEND
STA C40+14.21
N=2185798.71
E=6215544.63
12" 45° BEND
STA C40+86.72
N=2185728.21
E=6215527.72
12" 22.5° BEND
STA C41+58.52
N=2185657.29
E=6215538.96
12" 11.25° BEND
STA C43+18.76
N=2185497.17
E=6215532.69
12" 11.25° BEND
STA C45+23.97
N=2185297.62
E=6215484.84
12" 11.25° BEND
STA C45+84.50
N=2185237.14
E=6215482.48
12" 11.25° BEND
STA C46+68.39
N=2185156.13
E=6215460.98
12" 90° BEND
STA C48+81.67
N=2185086.95
E=6215662.74
12" 90° BEND
12" RW
C38+00
C39+00
C40+00
C41+00
C42+00
C43+00 C44+00
C45+00
C46+00
C47+00
C48+00
C49+00
11+00
LIVE
OAK
AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:32:02 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C15
45 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C39+00 TO STA C49+00
8660F1099C15.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.

2. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#

THIS SHEET
M-408
METER
TAP
12" BFV
CARV
M-409
METER
TAP
CARV
MATCH LINE STA C39+00 SEE DWG 99C14 MATCH LINE STA C49+00 SEE DWG 99C16 FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH

BLOW OFF
EX 6" UTILITY
1 1
TYP
CY901
TYP
CY715
TYP
CY745
TYP
CY901
TYP
CY745
TYP
CY733
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:11:01-07'00'

Page 470 of 3073 ends

NO PARKING

NO PARKING
NO

PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING
EX 6" SS

EX G
EX 4" W

EX W
EX 6" SS

EX OHW
EX 8" W
EX 8" W

EX OHW

EX OHW
STA C49+07.21
N=2185062.99
E=6215653.93
12" x 8" RED
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00
C56+00
C57+00
C58+00
C59+00
8" RW
STA C56+15.54
N=2184414.14
E=6215379.19
8" 11.25° BEND
STA C56+31.12
N=2184399.91
E=6215372.84
8" 22.5° BEND
STA C57+34.49
N=2184296.57
E=6215370.04
8" x 6" RED
STA. 54+84.74
N=2184520.88
E=6215454.77
Δ=15°07'40"

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
672
676
680
684
688
692
696
700
704
672
676
680
684
688
692
696
700
704
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00 C56+00 C57+00 C58+00 C59+00 EX GAS INV=679.0± EX W INV=686.3± EX 8" W INV=691.0± EX W LATERAL INV=693.4± STA C49+07.21 INV=676.67 12" x 8" RED STA C55+76.78 INV=688.35 8" 11.25° BEND STA C55+87.79 INV=690.36 8" 11.25° BEND STA C56+15.54 INV=690.82 8" 11.25° BEND STA C56+31.12 INV=690.98 8" 22.5° BEND STA C57+34.49 INV=692.42 8" x 6" RED STA C49+18.17 INV=676.67 STA C49+87.21 8" BFVSTA C53+33.90 INV=683.62 STA C54+84.74 INV=688.20 STA C57+14.50 8" GV

EXISTING GRADE
S=0.04% S=-1.67%
S=-1.67%
S=-3.04%
S=-0.16%
S=-19.92%
S=-1.09% S=-1.12% S=-0.99% S=-3.08%
S=-2.49%
TYP
CY111
INSTALL 7 LF OF 12" PVC DR18
INSTALL 827 LF OF 8" PVC DR18 TYP
CY111
INSTALL 162 LF OF 6" PVC DR18
TYP
CY111
RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQ'D STA C50+92.00 STA C55+93.00 STA C58+20.00
M-410
STA A57+00.00
METER TAPM-411
STA A57+30.00

METER TAP
Plot Date: 4/7/2023 11:32:39 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C16
46 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C49+00 TO STA C59+00
8660F1099C16.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.
8" BFV
TYP
CY715
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

3. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.

4. CONTRACTOR SHALL REPLACE ANY CURB AND

GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF

UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
M-411
TYP
CY901
8" GV
TYP
CY716
M-410
TYP
CY901

LIVE OAK AVE

LIVE OAK AVE

CYPRESS AVE

CLUBHOUSE DR

THIS SHEET
4 1
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
MATCH LINE STA C59+00 SEE DWG 99C17
MATCH LINE STA C49+00 SEE DWG 99C15
1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:11:15-07'00'

Page 471 of 3073 ends

688
692
696
700
704
708
712
716
720
688
692
696
700
704
708
712
716
720
C59+00 C60+00 C61+00 C62+00 C63+00 C64+00 C65+00 C66+00 C67+00 C68+00 EX W (HYD) INV=700.4± EX E INV=701.8± EX W (HYD) INV=702.0± EX 6" SS INV=698.5± EX 6" W INV=700.9± EX 8" SS INV=703.0± S=-1.11%
S=-1.35%
S=-1.90% S=-1.43%
S=-1.94%
S=3.58%
S=0.00%
S=-2.57%
STA C60+22.31
INV=699.667
6" 45° BEND
STA C60+73.52
INV=700.230
6" 45° BEND
STA C61+07.35
INV=700.680
6" 11.25° BEND
STA C61+27.21
INV=701.050
6" 11.25° BEND
STA C61+76.36
INV=701.750
6" 11.25° BEND
STA C62+25.44
INV=702.690
6" 22.5° BEND
STA C63+81.67
INV=697.120
6" 90° BEND
STA C64+12.00
INV=697.12
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA C62+20.00
CARV
STA C64+10.00

BLOW OFF
STA C60+10.00STA C60+34.00STA C60+61.00
STA C60+86.00
STA C61+01.00STA C61+14.00
STA C61+20.00STA C61+32.00
STA C61+70.00STA C61+82.00STA C62+18.00STA C62+30.00STA C63+50.00STA C64+11.00STA C67+34.00

NO PARKING

NO PARKING
NO

PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING

NO PARKING
EX 6" SS
EX 8" W

EX OHW
EX 8" W
EX 6" SS

EX OHW
EX 6" SS
STA C60+22.31
N=2184008.86
E=6215362.25
6" 45° BEND
STA C60+73.52
N=2183971.68
E=6215397.47
6" 45° BEND
STA C61+07.35
N=2183937.90
E=6215395.64
6" 11.25° BEND
STA C61+27.21
N=2183918.24
E=6215398.46
6" 11.25° BEND
STA C61+76.36
N=2183871.88
E=6215414.78
6" 11.25° BEND
STA C62+25.44
N=2183829.66
E=6215439.80
6" 22.5° BEND
STA C63+81.67
N=2183744.05
E=6215570.49
6" 90° BEND
6" RWC59+00
6" RW
C60+00
C61+00
C62+00
C63+00
C64+00
C65+00
C66+00

EX OHW
EX 8" SS
EX 4" W
EX 6" SS
6" RW
C65+00 C66+00 C67+00 C68+00

LIVE OAK AVE

N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:33:12 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C17
47 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C59+00 TO C68+00
8660F1099C17.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA C65+00 SEE LEFT
MATCH LINE STA C65+00 SEE RIGHT
MATCH LINE STA C59+00 SEE DWG 99C16
MATCH LINE STA C68+00 SEE DWG 99C18

BLOW OFF
TYP
CY733
CARV
TYP
CY745

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

3. CONTRACTOR TO SUPPORT UTILITY POLE AS
REQUIRED BY UTILITY POLE OWNER.

4. RESTRAINED JOINTS REQUIRED.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
3 1 1 1 1 1 1
#
4 4 4 4 4 4
1 4
4 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:04:13-07'00'

Page 472 of 3073 ends

696
700
704
708
712
716
720
724
728
696
700
704
708
712
716
720
724
728
C68+00 C69+00 C70+00 C71+00 C72+00 S=-2.56% S=-0.65%
S=-0.85%
STA C68+14.64
6" GV
STA C68+38.73
INV=707.98
6" 45° BEND
STA C68+40.15
INV=707.98
6" x 4" RED
STA C68+69.90
INV=708.17
4" 22.5° BEND
M-412
STA C68+68.00
METER TAPM-413
STA C70+40.00

METER TAP
STA C70+45.00
CARV
INSTALL 206 LF OF 4" PVC DR18

RESTRAINED JOINTS REQ'D

GRADE ASSUMED
STA C70+45.45
TYP
CY111
INSTALL 40 LF OF 6" PVC DR18
TYP
CY111

NO PARKING

NO PARKING
C68+00
C69+00
C70+00
C70+45.56
STA C68+69.90
N=2183351.19
E=6215295.37
4" 22.5° BEND
STA C68+38.73
N=2183358.01
E=6215325.78
6" 45° BEND
STA C68+40.15
N=2183357.70
E=6215324.40
6" x 4" RED
4" RW
6" RW
11+00 LIVE OAK AVE N BUSH ST

LOW GAP RD

LOW GAP RD
Plot Date: 4/7/2023 11:33:43 AM
SCALE

KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C18
48 CIVIL

PLAN AND PROFILE ALIGNMENT C
STA C68+00 TO STA C70+45.56
8660F1099C18.dwg JDiDonato 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 76832
Know what's below.

Callbefore you dig.

MATCH LINE STA C68+00 SEE DWG 99C17
M-413
METER
TAP
CARV
M-412
METER
TAP

THIS SHEET
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)

KEY MAP
NORTH
4" RESTRAINED CAP
6" GV
TYP
CY716
KEY NOTES:

1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF

OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE

THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.

2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.

GENERAL NOTES:

1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.

2. THE CONTRACTOR SHALL ASSUME THAT ANY

VERTICAL BENDS SHOWN ARE ROTATED FROM

CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.

3. CONTRACTOR TO REPLACE ALL ROAD STRIPING

DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
TYP
CY901
TYP
CY901
TYP
CY745
111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:03:46-07'00'

Page 473 of 3073 ends

602
601
600
601
600
600
602
600
599
601
602
598
599
600
EX-21" SS
21" SS
21" SS
21" SS
16" RW
4" RW
16" OVERFLOW
EX-16" RW
600 599 598 597 596
601
602
595
602
602
Plot Date: 4/7/2023 11:51:50 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C19
49 CIVIL

PUMP STATION AND

STORAGE SITE PLAN
8660F1099C19.dwg JDiDonato 8660F10
FILE:

PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

RECYCLED WATER

STORAGE TANK

ACCESS ROAD

NEW BLADDER TYPE

SURGE VESSEL

EXISTING PIPE TO BE

DECOMMISSIONED
(ABANDONED/REMOVED)

MAINTAIN EXISTING

SLUDGE POND
NEW

RECONSTRUCTED
POND

TOE OF SLOPE

TOP OF SLOPE
EX 24" DIP TRANSFER PIPE

FROM BOOSTER PS
C
99S02

ELECTRICAL

BUILDING
A
99M01

RECYCLED WATER

PUMP STATION
TYP
CY131
3 5
4 D
99M03
TYP
CY131
3 2
EX 24" SDR 35

PVC OVERFLOW
EX 18" CLCS PW

DISTRIBUTION PIPE
EX 1 1/2"

PVC NPW
EX 6"
PVC SS

EX TREATMENT BLDG
EX 16" RW

FROM WWTP

EX TRANSFORMER
EX 6"
PVC SS

TANK FILL VALVE
F
99S06

ELECTRICAL DUCT BANK

ELECTRICAL DUCT BANK
6 C
99C21

OLD CASTLE PRECAST HEADWALL (TYP),

OR EQUAL, OR CAST IN PLACE WITH

ACCORDANCE WITH CALTRANS
STANDARD PLAN D86B
INV: 595.00
KEY NOTES:

1. MAINTAIN USE OF EXISTING POND. DAMAGE TO

EXISTING BANK MUST BE PROTECTED OR
REPAIRED.

2. CONSTRUCT NEW ACCESS ROAD. TIE INTO
EXISTING PAVING.

3. NEW CONNECTION TO PHASES 1-3 PIPELINE. 16"
PVC 90-DEGREE BEND. PROVIDE THRUST BLOCK
PER CY131/TYP.

4. EXISTING PIPE TO BE DEWATERED, CAPPED, AND
ABANDONED IN PLACE.

5. REROUTE 360 LF OF 21" SANITARY SEWER. SEE
DWG 99C22.

6. PROTECT 24" DIP IN PLACE DURING POND
RECONSTRUCTION. REPLACE IN PLACE SEGMENT

OF PIPE DAYLIGHTED DUE TO POND EXCAVATION
AND CONSTRUCTION.

GENERAL NOTES:

1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#
5 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:05:05-07'00'

Page 474 of 3073 ends

600
599
598 597
596
601
602
595
602
602
3:1
3:1
3:1
3:1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
C1
C2
C3
C4
C5
C6
C7
5' MIN TANK FLOWLINE
100'

COORDINATE CONTROL POINTS
POINT 123456789
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 NORTHING
2186432.31
2186412.37
2186404.57
2186398.81
2186375.82
2186338.26
2186377.89
2186376.76
2186427.13
2186439.15
2186462.03
2186466.02
2186470.77
2186447.73
2186443.74
2186420.69
2186425.31
2186461.67
2186470.13
2186492.11
2186558.26
2186587.34
2186596.62
2186569.87

EASTING
6223035.61
6223037.12
6222933.98
6222919.81
6222892.36
6222847.51
6222804.48
6222789.53
6222768.18
6222781.31
6222765.54
6222765.23
6222828.07
6222854.89
6222855.19
6222882.00
6222929.76
6222962.09
6222806.37
6222781.66
6222778.90
6222804.76
6222927.48
6222957.57

ELEVATION
598.40
597.60
601.20
601.30
601.70

0.00 602.00
602.00
601.95
601.75
601.65
601.60
601.20
601.20
601.20
601.20
601.00
601.00
601.00
601.00
601.00
601.00
601.00
601.00

DESCRIPTION

PI ROAD

PI ROAD
PC C1
PT C1

PI ASPHALT

CENTER OF TANK

PI ASPHALT

PUMP STA SE CORNER

PUMP STA NW CORNER

ELEC BLDG SE CORNER

ELEC BLDG NW CORNER

PI ASPHALT
PC C2
PT C2
PC C3
PT C3
PC C4
PT C4
PC C5
PT C5
PC C6
PT C6
PC C7
PT C7

CURVE TABLE
NO. XX
C1
C2
C3
C4
C5
C6
C7
LENGTH

15.54'

39.27'

39.27'

53.80'

36.91'

43.04'

44.93'
RADIUS

25.00'

25.00'

25.00'

35.00'

23.00'

28.00'

28.00'
DELTA
35°37'06"
90°00'00"
90°00'00"
88°03'54"
91°56'06"
88°03'54"
91°56'06"

TANGENT

8.03'

25.00'

25.00'

33.84'

23.79'

27.07'

28.96'
Plot Date: 4/7/2023 11:52:20 AM

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
BH
BWA
99C20
50 CIVIL

GRADING AND DRAINAGE
PLAN
8660F1099C20.dwg JDiDonato 8660F10
FILE:

PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.

Callbefore you dig.

RECYCLED WATER

STORAGE TANK

NEW BLADDER TYPE

SURGE VESSEL
NEW

RECONSTRUCTED

POND TOE OF SLOPE

TOP OF SLOPE
C
99S02

ELECTRICAL

BUILDING
A
99M01

RECYCLED WATER
PUMP STATION 5
D
99M03
2 KEY NOTES:

1. MATCH EXISTING GRADE WHERE INDICATED.

2. GRADE MIN 4% AWAY FROM TANK IN ALL
DIRECTIONS.

3. REMOVABLE GUARD POST PER CF161/TYP.

4. ALL UNPAVED AREAS WITHIN THE PROJECT SITE

SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS NOTED OTHERWISE.

5. GRAVEL ACCESS ROAD SHALL BE 0'=6" AB OVER
GEOTEXTILE FABRIC WITH 1'=0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.

6. CONDUIT TRENCH PATCH TO MATCH EXISTING
GRADE.

7. REFER TO DWG 99C22 FOR SSMH LOCATIONS.

GENERAL NOTES:

1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#

EX TREATMENT BLDG

EX TRANSFORMER

TANK FILL VALVE
F
99S06
SSMH
SSMH

ELEC HH

ELEC HH

ELEC HH

EX FENCE TO
REMAIN
1 B
99C21
FG 601.25
FL 601.49
FG 601.25
A
99C21
FL 602.90
FG 603.39
FG 602.40
FL 602.20
S=1.00%
S=1.00%
S=0.95% S=1.00%
S=1.00%
FL 602.20
FG 602.40 S=1.00%
S=1.00%
FL 601.60
FG 601.22
FL 601.84
±
±±
-
4 1
4 4
5 5
5 3 TYP OF 4
3 TYP OF 7
TYP OF 4
3 1
1 6
6 6
6 FL 603.19
7 7 SSMH
7 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:06:37-07'00'

Page 475 of 3073 ends

1 10'-0" 10'-0"
1" LIP

2.5 % SLOPE
3 2
CL

FL SWALE
5'-0"
4 % MIN

FF TANK
Plot Date: 4/7/2023 11:53:01 AM
GENERAL NOTES:

1. REFER TO SPECIFICATIONS AND GEOTEXTILE

REPORT FOR SUBGRADE PREPARATION
REQUIREMENTS.

SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JRD
BWA
99C21
51 CIVIL

SECTIONS
8660F1099C21.dwg JDiDonato 8660F10
SCALE:

FILE:

A
99C20

SECTION
1/2" = 1'-0"
8660F1001C107
SCALE:

FILE:

B
99C20

SECTION
1/2" = 1'-0"
8660F1001C107
0 1' 2' 4'
SCALE:
1 2" = 1'-0"
SCALE:

FILE:

C
99C19

SECTION - TYPICAL POND BERM

NO SCALE
8660F1001C107

SCARIFY AND RECOMPACT
TO 90%

BASIN LINING RIVER ROCK
(6" MIN) OVER GEOTEXTILE
FABRIC PER SECTION 02620

EXCAVATION NEAT LINE

BASIN SIDE SLOPE
3H:1V (TYP)
FG: 595.00
3 TOP OF BERM
(MATCH EXISTING GRADE)
3 KEY NOTES:

1. GRAVEL ACCESS ROAD SHALL BE 0'-6" AB OVER
GEOTEXTILE FABRIC WITH 1'-0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.

2. ALL UNPAVED AREAS WITHIN THE PROJECT SITE

SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.

3. REFER TO DWG 99C20 FOR FINAL GRADING
ELEVATIONS.

X
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:08:37-07'00'

Page 476 of 3073 ends

9+00 10+00
11+00
12+00
13+00
14+00 EX 21" SS
EX 21" SS
21" SS 21" SS
STA. 10+00.00
60" MH01
N=2186294.83
E=6222714.84
STA. 10+59.59
60" MH02
N=2186246.87
E=6222750.22
STA. 13+68.52
60" MH03
N=2186295.44
E=6223055.30
16" RW
576
580
584
588
592
596
600
604
576
580
584
588
592
596
600
604
9+00 10+00 11+00 12+00 13+00 14+00 60" MH01 STA. 10+00 RIM=599.18 INV IN=588.84 (21" SE) INV IN=588.94 (21" W) 60" MH02 STA. 10+59.59 RIM=599.16 INV IN=588.68 (21" NW) INV OUT=588.54 (21" E) 60" MH03 STA. 13+68.52 RIM=597.92 INV IN=587.30 (21" W) INV OUT=587.30 (21" E) EX 21" SS
EX 21" SS
21" SS
21" SS
S=0.27%
S=0.40%
Plot Date: 4/7/2023 10:13:35 AM
SCALE

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.

Callbefore you dig.

PROJECT NO. LAST SAVED BY: FILE NAME:

CDA
JDM
BWA
99C22
52 CIVIL

SEWER REALIGNMENT
8660F1099C22.dwg atucker 8660F10
FILE:

PLAN
8660F1001C102

PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
TYP
CS110

EXISTING GRADE
TYP
CS110
TYP
CS110
3 FUTURE

RECYCLED WATER

STORAGE TANK
2 1
1 1
KEY NOTES:

1. CONTRACTOR TO VERIFY THE INVERTS OF ALL

REPLACEMENT MANHOLES PRIOR TO

REPLACEMENT

2. STORAGE TANK, YARD PIPING, AND ELECTRICAL
DUCT BANK SHOWN FOR REFERENCE ONLY.

REFER TO SPECIFIC DRAWINGS FOR
CONSTRUCTION DETAILS. INSTALLATION OF THE

STORAGE TANK, YARD PIPING, AND ELECTRICAL

DUCT BANKS SHALL OCCUR AFTER THE

REPLACEMENT SEWER HAS BEEN CONSTRUCTED

3. SEGMENT OF EXISTING 21-INCH SEWER TO BE
REMOVED.

4. SEGMENT OF EXISTING 16-INCH RECYCLED

WATER PIPELINE TO BE DECOMMISSIONED
GENERAL NOTES:

1. CONTRACTOR TO VERIFY THE HORIZONTAL AND

VERTICAL LOCATIONS OF ALL EXISTING UTILITIES

PRIOR TO THE START OF CONSTRUCTION AND

NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.

2. EXISTING SEWER SEGMENT TO BE REMOVED AND

REPLACED AS SHOWN IN THE NEW SEWER

ALIGNMENT PRIOR TO THE CONSTRUCTION OF
STORAGE TANK.

3. CONTRACTOR TO BYPASS SEWER FLOWS DURING
REPLACEMENT OF SEWER.

X
367 LF 21-INCH SDR 21 PVC SS
TYP
CY111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.10 09:02:27-07'00'

Page 477 of 3073 ends

Plot Date: 4/6/2023 8:53:07 AM PROJECT NO. LAST SAVED BY: FILE NAME:

MH
RGU
MCK
ARCHITECTURAL 99A01

ELECTRICAL BUILDING

CODE ANALYSIS, SCHEDULES, AND EGRESS PLAN
8660F1099A01.dwg vpetersvargas 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
ROOM
NO. ROOM NAME OCCUPANCY ACCESSIBILITY BASIC

ALLOWABLE
AREA

ALLOWABLE

FLOOR AREA

PER OCCUP
ACTUAL
SQ FT

SPRINKLERED
EXITS

REQUIRED/

PROVIDED

OCCUPANCY

SEPARATION

BASIC ALLOW

STORIES/HEIGHT

OCCUPANCY
LOAD

CONSTRUCTION
TYPE
2022 CALIFORNIA BUILDING CODE
101 F-1 II-B 2 STORIES/55 FT 15,500 300 1 2/2 NR NR NR* - BUILDING ACTUAL F-1 II-B 2 STORIES/55 FT 15,500
ELECTRICAL ROOM 264
264

ELECTRICAL BUILDING

COMMENTS
NO.

DOOR

WIDTH THICK HEIGHT
DOOR

MAT'L FINISH WIDTH HEIGHT DEPTH TYPE
FRAME

MAT'L FINISH HEAD JAMB

DETAILS

SILL READER
CARD
LABEL
UL
TYPE

DOOR AND HARDWARE SCHEDULE

REMARKS
HW
GROUP

MAT'L MATERIAL
HW HARDWARE GROUP, REFERENCE SPECIFICATION SECTION 08710

NR NOT REQUIRED

R REQUIRED

UL UNDERWRITERS LABORATORIES FIRE RATING

ELECTRICAL BUILDING
101-1 7'-2" 1 3/4" V HM COATING

COATING
6'-8"
3'-4"
7'-4"
7'-4"
8"
8"
R
R
HM
HM

COATING

COATING
C
C
C
C
E
E
NR
NR
NR
NR
HW-1
HW-2
-
-
PR (3'-0'')
101-2 3'-0" 7'-2" 1 3/4" V HM
ROOM
NO. ROOM NAME
MAT'L
FLOOR

FINISH MAT'L
BASE

MAT'L FINISH

NORTH WALL

MAT'L HEIGHT

CEILING

MAT'L FINISH FINISH

SOUTH WALL

MAT'L FINISH MAT'L FINISH

EAST WALL WEST WALL

ROOM FINISH SCHEDULE

ELECTRICAL BUILDING
101 ELECTRICAL ROOM CONC SEALER CMU CMU PAINTING CMU PAINTING CMU PAINTING CMU PAINTING MTLDK ±18'-0" EXPO

EGRESS ABBREVIATION AND SYMBOL LIST
# #
##
SF: SQUARE FEET
OL: OCCUPANT LOAD
OLF: OCCUPANT LOAD FACTOR
SPR: AUTOMATIC SPRINKLER
NA: NOT APPLICABLE

DIRECTION OF EGRESS PATH

LENGTH OF EGRESS IN FEET

EXIT SIGN

FIRE EXTINGUISHER
FILE:

SCALE:

ELECTRICAL BUILDING - EGRESS PLAN A 1/4" = 1'-0"
8660F10S100
101

ELECTRICAL
ROOM
SF - 264
OL - 1
OLF - 300

SPR - NR

ENVELOPE COMPONENT U-VALUE REQUIRED U-VALUE PROVIDED
2022 CALIFORNIA ENERGY CODE
BUILDING ENVELOPE REQUIREMENTS - MENDOCINO COUNTY, CLIMATE ZONE 2

DOORS - SWINGING

DOORS - NONSWINGING

WALLS ABOVE GRADE, MASS

FLOORS, MASS

ROOFS - ABOVE ROOF DECK
U - 1.45
U - 0.70
CODE ANALYSIS ABBREVIATION LIST:

F-1 FACTORY INDUSTRIAL GROUP, MODERATE HAZARD OCCUPANCY (2022, CBC)

NR NOT REQUIRED

R REQUIRED

R-VALUE THERMAL RESISTANCE, IS THE INVERSE OF THE

TIME RATE OF HEAT FLOW THROUGH A BODY FROM ONE OF

ITS BOUNDING SURFACES TO THE OTHER SURFACE FOR A UNIT

TEMPERATURE DIFFERENCE BETWEEN THE TWO SURFACES,

UNDER STEADY STATE CONDITIONS, PER UNIT AREA
(2022, CBC)

SQ FT SQUARE FEET

U-FACTOR THERMAL TRANSMITTANCE, IS THE

COEFFICIENT OF HEAT TRANSMISSION (AIR TO AIR)

THROUGH A BUILDING COMPONENT OR ASSEMBLY, EQUAL

TO THE TIME RATE OF HEAT FLOW PER UNIT AREA AND UNIT

TEMPERATURE DIFFERENCE BETWEEN THE WARM SIDE AND

COLD SIDE AIR FILMS
(2022, CBC)
11' -2'' 13' -0''
FXE
U - 0.034 R-25
U - 0.039
U - 0.170 *
*
*
*
*
FXE
IN ACCORDANCE WITH SECTION 100.0(e)2.C OF THE 2022 CALIFORNIA ENERGY CODE, PROCESS SPACES. REFERENCE TITLE 24 DOCUMENTS FOR COMPLIANCE. *
IN ACCORDANCE WITH SECTION 11B-203.5 OF THE 2022 CALIFORNIA BUILDING

CODE, ELECTRICAL ROOMS ARE EXEMPT FROM ACCESSIBILITY REQUIREMENTS TYP
AJ103
TYP
AJ100
TYP
AJ105
TYP
AJ107
TYP
AJ109
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:39-04'00'
5263 OF 200

Page 478 of 3073 ends

Plot Date: 4/7/2023 9:59:06 AM PROJECT NO. LAST SAVED BY: FILE NAME:

MH
RGU
JKN
99A02
54 ARCHITECTURAL

ELECTRICAL BUILDING

ELEVATIONS
8660F1099A02.dwg vpetersvargas 8660F10

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13

ABCDEFG
G
®
No. 84405
1 18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
18'-0"

TOP OF MASONRY

EL REFERENCE

STRUCTURAL
TOP OF

FINISH FLOOR

EL REFERENCE

STRUCTURAL
7'-4"
24 SCALE:

FILE:

ELEVATION
E 1/4" = 1'-0"
8660F1001A201
NORTH
SCALE:

FILE:

ELEVATION
F 1/4" = 1'-0"
8660F1001A201
SOUTH
SCALE:

FILE:

ELEVATION
G 1/4" = 1'-0"
8660F1001A201
EAST
SCALE:

FILE:

ELEVATION
H 1/4" = 1'-0"
8660F1001A201
WEST
GENERAL NOTES:

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
DRAWING 00S01.

2. FOR DOOR SCHEDULES, REFER TO DRAWING
98A01.

3. EXTERIOR CONCRETE MASONRY UNITS TO BE
FINISHED WITH WATER REPELLANT.

TYP
AC310 W/ CAGE
TYP
AG225
TYP
AG222
TYP
AG220
TYP
AG225
TYP
AG227
3 TYP
AG220
3 TYP
AC310 W/ CAGE
TYP
AC310 W/ CAGE
TYP
AG220
3 TYP
AG220
3 1
1 1
7'-4"
24 1. 12''x8"x16'' STANDARD CONCRETE MASONRY
UNIT. REFER TO SPECIFICATION SECTION
04220.

2. HOLLOW METAL DOOR AND FRAME. SPEC
SECTION 08110.

3. ALUMINUM COPING OVER PARAPET IN

ACCORDANCE WITH SPECIFICATION SECTION
07700.

4. EXTERNAL LIGHT FIXTURE REFERENCE
ELECTRICAL DRAWINGS.
# KEY NOTES:

Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:45-04'00'

Page 479 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
JKN
AL
KP
00S01
55 STRUCTURAL

GENERAL STRUCTURAL NOTES
8660F100S01.dw
g
kjackson 8660F10
P
lotD
ate:12/14/2022
8:36:08
AM
UnitsDiscipline
P
lotD
ate: 07-APR
-2023 11:42:01
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
GENERAL NOTES: GEOTECHNICAL REPORT / FOUNDATION DESIGN CRITERIA:

TYPICAL STRUCTURAL MATERIALS:

CONSTRUCTION: STRUCTURAL SYMBOLS:

CURED TO THEIR MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.

OF THE WALL ARE IN PLACE, ARE COMPLETE, AND (IN THE CASE OF CONCRETE) HAVE

2.DO NOT PLACE BACKFILL AGAINST WALLS UNTIL STRUCTURES SUPPORTING THE TOP PREPARED, BEFORE PROCEEDING WITH FOUNDATION CONSTRUCTION.

OBTAIN ENGINEER’S OBSERVATION OF SUBGRADE SURFACES, AS EXPOSED AND AS

1. EXPOSE AND PREPARE SUBGRADE AS SHOWN ON THE DRAWINGS AND SPECIFIED.

EXCAVATION AND BACKFILLING:

REINFORCING STEEL (FOR CONCRETE AND MASONRY):

CONCRETE:

STRUCTURAL STEEL:

STAINLESS STEEL:

B. TYPE 304L: E304L-15 ELECTRODES.

A. TYPE 316L: E316L-15 ELECTRODES.

4. WELDED CONNECTIONS:

C. TYPE 304/304L: ASTM F 593, GRADE B8, CLASS 1, HEAVY HEX.

B. TYPE 316/316L: ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.

A. MATCH ALLOY OF THE STRUCTURAL MEMBERS CONNECTED.

3. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:

2. SECTIONS: SHAPES AND BARS: ASTM A 276.

1. ANSI TYPE 316/316L EXCEPT WHERE TYPE 304/304L IS INDICATED ON THE DRAWINGS.

STRUCTURAL ALUMINUM:

ALLOY 4043 ELECTRODES.

A. GAS METAL ARC (MIG) OR GAS TUNGSTEN ARC (TIG) PROCESS USING FILLER

3. WELDED CONNECTIONS:

A. STAINLESS STEEL - TYPE 316, ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.

2. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:

B. SHEET AND PLATE: ASTM B 209, ALLOY 6061-T6.

A. SHAPES: ASTM B 308, ALLOY 6061-T6.

1. SECTIONS
STRUCTURAL ABBREVIATIONS:

DEFERRED DESIGN SUBMITTALS
BRACING, AND BALANCING.

THEIR DESIGN STRENGTH, PROTECT STRUCTURES AS REQUIRED BY SHORING, FACILITIES. UNTIL CONSTRUCTION IS COMPLETE AND MEMBERS HAVE ACHIEVED A. STRUCTURES HAVE BEEN DESIGNED FOR OPERATING LOADS ON COMPLETED

8. CONSTRUCTION LOADS:

STRUCTURAL DESIGN CRITERIA - GENERAL:

A. EARTHQUAKE DESIGN DATA FOR EACH STRUCTURE AS PER SPECIFICATIONS 01850.

7.EARTHQUAKE DESIGN DATA:

C. BASIC WIND SPEED (3 SEC GUST, 33 FEET ABOVE GROUND): 110 MPH.

B. WIND-BORNE DEBRIS REGION: NO
A. SPECIAL WIND REGION: NO

6.WIND DESIGN DATA:

5.FLUID PRESSURE LOADS: 63 PSF/FT (UNO).

E. CONCENTRATED AND IMPACT LOADS: SEE PLANS.

D. EQUIPMENT LOADS: SEE PLANS.

C. ROOF LIVE LOAD: SEE PLANS (20 PSF MINIMUM).

B. GRATING AND CHECKERED PLATE: 100 PSF (UNO).

A. FLOOR LIVE LOAD: SEE PLANS.

4.LIVE LOADS: (REDUCTIONS NOT USED)

3.DEAD LOADS: CALCULATED FOR STRUCTURE SELF-WEIGHT.

2.STRUCTURE RISK CATEGORY: III EXCEPT FOR TANK, RISK CATEGORY IV B. LOCAL AMENDMENTS: UKIAH CITY CODE.

A. 2022 CALIFORNIA BUILDING CODE (“CBC 2022”) WITH ASCE 7-16.

1. BUILDING CODE:

THESE OVERALL CRITERIA FOR THE SITE.

SEE DRAWINGS OF INDIVIDUAL STRUCTURES FOR SPECIFIC DESIGN CRITERIA BASED ON

2. WELDED WIRE FABRIC: ASTM A 1064.

C. ASTM A615 GRADE 80 SPIRALS FOR PILES AS INDICATED ON DRAWINGS.

B. WHERE INDICATED ON THE DRAWINGS: ASTM A 706.

A. TYPICAL: ASTM A 615, GRADE 60.

1. DEFORMED BARS:

THE DRAWINGS.

CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE INDICATED ON ITS MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.

STRUCTURE ABOVE IS COMPLETE AND (IN THE CASE OF CONCRETE) HAS CURED TO ARE COMPLETE, PROVIDE BRACING FOR WALLS. KEEP BRACING IN PLACE UNTIL THE

3. WHERE BACKFILL MUST BE PLACED AGAINST WALLS BEFORE STRUCTURES ABOVE FOR DETAILED AND LOCATION-SPECIFIC REQUIREMENTS.

2. SEE PROJECT SPECIFICATIONS AND NOTES ON DRAWINGS OF SPECIFIC STRUCTURES OTHERWISE INDICATED ON THE DRAWINGS.

1. MATERIALS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS 2) WELDING.
1) BOLTING.

C.STRUCTURAL ALUMINUM.
2) WELDING.
1) HIGH-STRENGTH BOLTING.

B.STRUCTURAL STEEL (CARBON AND STAINLESS).
4) ANCHORS - POST-INSTALLED MECHANICAL AND ADHESIVE.
3) ANCHORS - CAST-IN AND BUILT-IN ANCHOR BOLTS.
2) MEMBER SIZES/TYPES.
1) MEMBER LOCATIONS.

A.GENERAL ALL METALS:

5.DIVISION 5 METALS
G.PROTECTION AND CURING PROCEDURES.

F.GROUT AND GROUTING.

E.MORTAR AND JOINTS.

D.ANCHORS: BUILT-IN AND POST-INSTALLED.

C.REINFORCING STEEL.

B.MEMBER SIZES.

A.LOCATIONS.

4.DIVISION 4 MASONRY
F.PROTECTION AND CURING PROCEDURES.

E.CONCRETE MIX AND PLACEMENT.

D.ANCHORS: CAST-IN AND POST-INSTALLED.

C.REINFORCING STEEL.

B.FORMWORK AND MEMBER SIZES.

A.LOCATIONS.

3.DIVISION 3 CONCRETE:

D.FILL AND BACKFILL.

C.PREPARATION OF SOILS/SURFACES SUPPORTING CONSTRUCTION.

B.ADEQUACY OF EXPOSED SURFACE TO PROVIDE REQUIRED SUPPORT.

A.EXCAVATION DEPTH.

2.DIVISION 2 SITE CONSTRUCTION (EARTHWORK)
AND CONSTRUCTION. SEE SPECIFICATION SECTION 01455 FOR DETAILS.

1. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING STRUCTURAL MATERIALS A. 05500 TRASH RACK GRATING.

1. DIVISION 5 METALS.

DEFERRED DESIGN SUBMITTALS FOR THIS PROJECT INCLUDE:

SUBSEQUENTLY SUBMITTED TO THE BUILDING OFFICIAL.

THAT ARE TO BE REVIEWED BY THE REGISTERED DESIGN PROFESSIONAL AND

OF THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF PERMIT APPLICATION, AND

AS DEFINED IN THE BUILDING CODE, DEFERRED DESIGN SUBMITTALS ARE PORTIONS

DISCREPANCIES
OPENINGS.

8.SEE STRUCTURAL DRAWINGS FOR LOCATIONS AND SIZES OF DOOR AND WINDOW D. SEE MECHANICAL DRAWINGS FOR EQUIPMENT PADS AND PIPE SUPPORTS.

AND ASSOCIATED STRUCTURAL REQUIREMENTS.

C. SEE MECHANICAL DRAWINGS FOR DETAILS OF PIPE PENETRATIONS, PIPE SUPPORTS, DIAMETER ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS.

B. IN GENERAL, OPENINGS, EMBEDMENTS, AND PENETRATIONS LESS THAN 12 INCHES IN ITEMS AND EQUIPMENT FURNISHED.

A. CONFIRM SIZE AND LOCATIONS OF OPENINGS, PENETRATIONS AND EMBEDMENT FOR STRUCTURES.

CONDUITS, AND OTHER ITEMS THAT ARE EMBEDDED INTO OR PASS THROUGH

7.DRAWINGS PREPARED BY OTHER DISCIPLINES INCLUDE OPENINGS, ANCHORS, PIPES, TO WHICH SITE COORDINATES REFER ARE SHOWN ON THE STRUCTURAL PLANS.

6.SEE CIVIL DRAWINGS FOR STRUCTURE COORDINATES. POINTS ON THE STRUCTURES ORIENTATION REQUIRED AT THAT STRUCTURE.

CONCRETE) IS GENERALLY ARBITRARY. SEE DRAWINGS OF EACH STRUCTURE FOR REINFORCEMENT (WHETHER “LINES” OR “DOTS”ARE CLOSER TO THE FACE OF THE B. IN STRUCTURAL TYPICAL DETAILS, ORIENTATION OF BARS IN EACH MAT OF TITLES, EVEN WHEN NOT SPECIFICALLY REFERENCED ON THE DRAWINGS.

A. TYPICAL DETAILS ARE INTENDED TO APPLY AT LOCATIONS DESCRIBED BY THEIR

5.TYPICAL DETAILS ARE INCLUDED ON THE “TS” DRAWINGS.

B. SIZES AND LOCATIONS OF EQUIPMENT PADS FOR EQUIPMENT SELECTED.

A. DIMENSIONS AND WEIGHTS FOR EQUIPMENT SELECTED.

FOLLOWING BEFORE PREPARATION AND SUBMITTAL OF SHOP DRAWINGS:

DIMENSIONS, AND INFORMATION SHOWN ON THESE DRAWINGS. CONFIRM THE

IMMEDIATELY OF BETWEEN EXISTING CONDITIONS AND

4.VERIFY DIMENSIONS AND CONDITIONS BEFORE BEGINNING WORK. ADVISE ENGINEER SHOWS CONSTRUCTION AT AND BELOW ELEVATION 110.)
C. PLANS ARE TREATED AS HORIZONTAL SECTIONS. (I.E.: “PLAN AT ELEVATION 110” B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.

A. SCREENED LINE WORK INDICATES EXISTING CONDITIONS.

3.PRESENTATION CONVENTIONS FOR STRUCTURAL DRAWINGS:

INDICATED IN THE GENERAL NOTES AND TYPICAL DETAILS.

2.UNLESS DETAILED, SPECIFIED, OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS DISCIPLINES AND WITH THE SPECIFICATIONS.

1.USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH PROJECT DRAWINGS BY OTHER PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT C.ELEVATED SLABS
PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT B.CONCRETE WALLS
PRIOR TO CASTING OF CONCRETE.

1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT A. FOUNDATIONS

2. ALL STRUCTURAL IN ALL AREAS:

CONSTRUCTION WHILE CORRECTIONS CAN BE MADE.

1. STRUCTURAL OBSERVATION IS REQUIRED DURING AND AT SPECIFIC STAGES OF STRUCTURAL OBSERVATION:

1. NORMAL DENSITY.

2. MINIMUM SPECIFIED CONCRETE COMPRESSIVE STRENGTH, f’c (AT 28 DAYS UNO).

A. STRUCTURES: “CLASS A”& DRILLED PIERS f’c = 4500 PSI.

B. FILL AND THRUST BLOCKS: “CLASS C” f’c = 2500 PSI.

C. PIPE ENCASEMENT: “CLASS A” f’c = 4500 PSI.

D. ELECTRICAL DUCT ENCASEMENT: “CLASS CE” f’c = 3000 PSI.

MATERIAL.

B.COVER PLATE AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME OTHERWISE NOTED.

A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS

3.COVER PLATES:

FASTEN GRATING TO SUPPORTS AS INDICATED IN S559/TYP.

C.UNLESS INDICATED ON THE DRAWINGS AS “REMOVABLE GRATING”, SECURELY B.GRATING AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME MATERIAL.

OTHERWISE NOTED.

A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS

2.GRATING:

A.ALUMINUM, EXCEPT WHERE OTHER MATERIALS ARE NOTED.

1. HANDRAILS AND GUARDRAILS:

METAL FABRICATIONS:

SLIDING COEFFICIENT OF FRICTION: 0.3 0.3
AT REST (PSF/FT): 65 65
ACTIVE (PSF/FT): 50 50

STATIC SEISMIC
SURCHARGE: EQUIVALENT TO 2 FEET OF SOIL ABOVE FINISHED GRADE.

B. LATERAL EARTH PRESSURE (UNO):

A. NET ALLOWABLE BEARING PRESSURE SEE PLANS.

INVESTIGATION REPORT.

2. FOUNDATION DESIGNS ARE BASED ON RECOMMENDATIONS IN THE GEOTECHNICAL REPORT NO: CRAWFORD FILE NO. 19-503.1 DATED: FEBRUARY 2023.

PREPARED BY: CRAWFORD AND ASSOCIATES.

PHASE 4 DESIGN PROJECT
TITLE: GEOTECHNICAL REPORT CITY OF UKIAH RECYCLED WATER PIPELINE

1. GEOTECHNICAL INVESTIGATION REPORT:
(AWS) A2.4.

2.WELDING: SYMBOLS: IN ACCORDANCE WITH AMERICAN WELDING SOCIETY FOR DEFINITION OF MATERIALS SHADING PATTERNS.

1. SEE DRAWING 00G03 FOR KEY TO DRAWING TITLES AND SECTION CUTS, AND

BAR SIZE)
# NUMBER (REINFORCING
T.O. TOP OF
O.F. OUTSIDE FACE
I.F. INSIDE FACE

EF EACH FACE PL PLATE

BO BOTTOM OF L ANGLE
REINFORCEMENT: OTHER:

ABBREVIATIONS HAVE THE MEANINGS LISTED.

WHEN USED ON THE STRUCTURAL DRAWINGS, THE FOLLOWING

4. ABBREVIATIONS FOR STRUCTURAL DRAWINGS:

THE ALUMINUM ASSOCIATION’S ALUMINUM DESIGN MANUAL, CURRENT EDITION.

B.ALUMINUM: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH MANUAL, CURRENT EDITION.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION’S STEEL CONSTRUCTION A.STEEL: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH THE

3. STRUCTURAL MEMBERS:

PROJECT SPECIFICATIONS.

2. ABBREVIATIONS FOR NAMES OF TECHNICAL GROUPS MAY BE FOUND IN THE

1. SEE DRAWING 00G03 FOR GENERAL LIST OF ABBREVIATIONS USED ON DRAWINGS.

C. WELDS - SHIELDED METAL ARC PROCESS USING E70-XX ELECTRODES.

ASTM F 1554, GRADE 36 GALVANIZED.

ASTM F 593, STAINLESS TYPE 316
ANCHOR BOLTS WITH HEX FORGED HEAD.

B. BOLTS - STEEL TO CONCRETE OR MASONRY:

ASTM A 325 HIGH-STRENGTH BOLTS, WITH LOAD INDICATOR WASHERS.

A. BOLTS - STEEL TO STEEL:

2. CONNECTIONS:

SQUARE AND RECTANGULAR: ASTM A 500, GRADE B (Fy = 46 KSI) ROUND: ASTM A 500, GRADE B (Fy = 42 KSI)
E. HOLLOW STRUCTURAL SECTIONS:

D. PIPES: ASTM A 53, GRADE B (Fy = 35 KSI)
C. PLATES AND BARS: ASTM A 36 (Fy = 36 KSI)
B. SHAPES S, ST, M, MT, HP, C, MC, L: ASTM A 36 (Fy = 36 KSI) A. SHAPES W, WT: ASTM A 992 (Fy = 50 KSI)

1. SECTIONS
E
H
ANCHORS.

LOCATIONS OF REINFORCEMENT IN MEMBERS BEFORE DRILLING HOLES FOR ANCHORS. USE NON-DESTRUCTIVE TESTING EQUIPMENT TO IDENTIFY B.DO NOT CUT, DAMAGE, OR INTERRUPT EXISTING REINFORCEMENT TO INSTALL EVALUATION REPORT AND MANUFACTURER’S INSTRUCTIONS.

A.INSTALL IN FULL COMPLIANCE WITH ACCEPTED BUILDING CODE

4.POST-INSTALLED ANCHORS IN CONCRETE AND MASONRY:

ALUMINUM SURFACES AS SPECIFIED IN SECTION 09960.

B.WHERE ALUMINUM IS IN CONTACT WITH MASONRY OR CONCRETE, COAT ISOLATING SLEEVES AND WASHERS AS SPECIFIED IN SECTION 05190.

AND STAINLESS STEEL, OR ALUMINUM AND STEEL) PROVIDE
A.AT BOLTED CONNECTIONS THAT INCLUDE DIFFERENT METALS (E.G.: STEEL

3.INTERFACE BETWEEN MATERIALS:

BEING JOINED, AND FULL LENGTH OF THE JOINT.

A.FILLET WELDS: PER AWS CODE BASED ON THE THICKNESS OF THE MATERIALS

2.WELDED:

EDGE OF A PLATE OR STRUCTURAL ELEMENT.

C.WITH A DISTANCE OF AT LEAST 1 1/2 INCHES FROM CENTER OF BOLT TO ANY CENTER.

B.HAVING A MINIMUM OF 2 BOLTS, SPACED NOT CLOSER THAN 3 INCHES ON A.MADE USING 3/4-INCH DIAMETER BOLTS.

1. BOLTED:

STEEL, STAINLESS STEEL, AND ALUMINUM - CONNECTIONS:

A.FULLY GROUTED.

4.GROUTING:

DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.

3.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS AS INDICATED IN S410/TYP.

A.AT CORNERS AND JUNCTIONS AS INDICATED IN S412/TYP.

2.PROVIDE REINFORCING:

1. SEE S400/TYP FOR MASONRY NOTES, INCLUDING LAP SPLICE LENGTHS.

MASONRY:

B. HOUSEKEEPING PAD FOR ELECTRICAL EQUIPMENT SEE S350/TYP.

A. EQUIPMENT PAD SEE S302/TYP.

8. CONCRETE PADS

7.FINISH CONCRETE AS SPECIFIED IN SECTION 03366.

AND EMBEDMENTS.

6.MAINTAIN MINIMUM 3 INCHES CLEAR CONCRETE COVER BETWEEN REINFORCING DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.

5.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS - AS INDICATED IN S180/TYP.

ADDED BARS WHERE INDICATED ON THE DRAWINGS.

A.AT CORNERS AND JUNCTIONS - AS INDICATED IN S144/TYP, SUPPLEMENT WITH

4.PROVIDE REINFORCING:

SPECIFICATION 03102 FOR CHAMFERS.

3.PROVIDE CHAMFER AT EXPOSED EDGES OF CAST-IN-PLACE CONCRETE. SEE ACCEPTANCE BY THE ENGINEER BEFORE FORM LAYOUT.

2.SUBMIT LOCATIONS OF CONSTRUCTION JOINTS NOT SHOWN ON THE DRAWINGS FOR LENGTH REQUIREMENTS FOR REINFORCING.

1. SEE S101/TYP FOR CONCRETE NOTES, INCLUDING CLEAR COVER AND LAP SPLICE CONCRETE:

SPECIAL INSPECTION
E. STORAGE POND: “CLASS A” f’c = 5000 PSI.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:22:13-07'00'

Page 480 of 3073 ends

4'-6"
3'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:56
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

STRUCTURAL
8660F10 8660F1085S01.dgn
C
85S02
A 3/16"=1'-0"
CLARIFIER NO.4 CLARIFIER NO.3 CLARIFIER NO.2
FILTER NO.4 FILTER NO.3 FILTER NO.2 FILTER NO.1
#
GENERAL NOTES:

KEY NOTES:

AWT CLARIFIER/FILTER PLAN
B
85S02
8660F1085S100
CLARIFIER NO.1
1 85S02
WORK SEQUENCING).

SPECIFICATION SECTION 01140 FOR CONSTRAINTS AND POSSIBLE

DONE DURING THE MEDIA REPLACEMENT PROCESS (REFER TO

2. ACCESSING ALL OF THE SURFACE REQUIRES THIS WORK TO BE CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 1994 RECORD DRAWINGS.
kjackson
D
85S02 2 (TYP)
1 (TYP)
KP
TU
56 TYP
(TYP) S304
(TYP)
(TYP
)
SECTION 09960.

SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION

2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960 DURING THE MEDIA REPLACEMENT PROCESS.

SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION

1. CONTRACTOR TO FULLY RECOAT INTERIOR AND EXTERIOR
JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:23:26-07'00'

Page 481 of 3073 ends

4'-6"
1'-0"
3'-6"
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:01
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

STRUCTURAL
8660F10 8660F1085S02.dgn
#
GENERAL NOTES:

KEY NOTES:

AWT CLARIFIER/FILTER
1 85S01
866F1085S02A
B
85S01
C
85S01

SECTIONS AND PHOTO
3/8"=1'-0"
3/8"=1'-0"
8660F1085S9303
8660F1085S9304
1 kjackson
3/8"=1'-0"
8660F1085S9305
D
85S01

COLLECTION TROUGH
3 2 4

1. REFER TO GENERAL NOTES ON 00S01.

TU
KP
57 TYP
(TYP) S304
TYP
(TYP) S304
(TYP)
(TYP
)
(TYP)
(TYP
)
TROUGH.

4. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF COLLECTION
SECTION 09960.

SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION

3. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960.

SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION

2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR AWT CLARIFIER/FILTER TANK HAS SIX ANCHOR BOLTS.

1. REPAIR AND REPLACE EXISTING ANCHOR BOLTS AS NEEDED. EACH JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:24:27-07'00'

Page 482 of 3073 ends

5'-0"
18'-0"13'-0" 1'-0"
1'-0" 8'-0"
10'-0"
1'-6"
10"
4'-0"
2'-10" 3'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:16
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S01.dgn

STRUCTURAL
PLANS
8660F10
91S01
(TYP)
D
A 3/8"=1'-0"
866F1091S100
B 3/8"=1'-0"
866F1091S101
91S02
D
91S02
#
GENERAL NOTES:

KEY NOTES:

TU
(TYP
)
(TYP)
(TYP
)
AND PIPE PENETRATION WITH MECHANICAL DRAWINGS.

1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE,
1 C
91S02
1'-6"
KP
(TYP)
12" DIA OPENING
C
91S02

PAU PUMP STATION

PAU PUMP STATION - FOUNDATION PAU PUMP STATION - TOP

1. FOR GENREAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
58 JKN
SPECIFICATION 05500

ACCESS LADDER PER
SPECIFICATION 08320. PROVIDE

BILCO TYPE J-AL OR SIMILAR, SEE
SINGLE LEAF ACCESS HATCH 3'-0".

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:25:58-07'00'

Page 483 of 3073 ends

LAP
2'-10"
#5@12"
1'-0"

FINISHED GRADE
H2E
#8@12"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 12:20:28
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S02.dgn

STRUCTURAL
8660F10
91S02
#
GENERAL NOTES:

KEY NOTES:
1 TOP OF BERM 581.00
TOC 565.00
C
91S01 3/8"=1'-0"
866F1091SS300
D
91S01 3/8"=1'-0"
866F1091SS300

SECTIONS
GRADE

FINISHED
TYP
S180
TU
KP
(TYP
)
SPLIC
E
TOC 582.00
TOP OF CURB 583.00

LAP SPLICE(TYP)

PAU PUMP STATION
#6@12" T&B
#6@12" T&B
(TYP)
#7@12" EF
INVERT 569.00
T&B H2E
#8@12"

1. FOR GENERAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
59 JKN
2 GEOTECHNICAL REPORT.

2. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PENETRATION WITH MECHANICAL DRAWINGS.

1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE, AND PIPE 2 (2) #5 CIRCULAR BAR
TYP
(W/WSTP) S140
(TYP) EF
#7@12"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:26:57-07'00'

Page 484 of 3073 ends

2'-0"
1'-0"
6"
2'-8"
1'-0"
5'-0" 1'-6" 1'-0"
1'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
2'-0"
9"
6'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:44
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1091S03.dgn

STRUCTURAL
8660F10
91S03
#
GENERAL NOTES:

KEY NOTES:

PLAN AND SECTION
16"-PVC
1/4
TYP
1 BEN MEADOWS, AND FORESTRY SUPPLIERS.

STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,

RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.

THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH

1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) SCALE:

FILE:

F
-

SECTION
3/4" = 1'-0"
8660F1000S301
F
-
16"-PVC
1 INV 569.03
TU
1 TOE OF EMBANKMENT
AT 3:1 TO MATCH BASIN SLOPE

FACE OF STRUCTURE - SLOPE

COUPLING

TRANSITION

FLEXIBLE
TYP

SST BATTEN,
316 SST
HSS 4 x 4 x 1/4"
TYP

SST BATTEN,
PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"
#5@12 EW

TRASH RACK
APRON

FLUSH WITH CONCRETE OUTLET AT
ENCASED IN CONCRETE. CUT ELBOW
INSTALL 16" DIA 90 DEG PVC ELBOW

FLEXIBLE COUPLING
#5 @ 12" EWEF
EL 570.00

BOTTOM OF POND
1 KP

PAU PUMP STATION INLET STRUCTURE
SCALE:

FILE:

E
3/4" = 1'-0"
866F1091S102
PLAN
91C08
kjackson
60 JKN
GEOTECHNICAL REPORT.

3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.

FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER

2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.

DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.

PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA. FINAL

CALCULATIONS STAMPED AND SIGNED BY A REGISTERED

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.

1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:28:22-07'00'

Page 485 of 3073 ends

1'-0"
5'-0" 1'-0"
2'-0" 3'-4"
1'-0"
6"
1'-0"
1'-0"
6'-0"
2'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
9"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:51
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1095S01.dgn

STRUCTURAL
8660F10
95S01
GENERAL NOTES:

PLAN AND SECTION
SCALE:

FILE:

J
-

SECTION
3/4" = 1'-0"
8660F1000S302
J
-
(TYP
)
16"-PVC
16"-PVC
1 1
TU
(TYP
)
# KEY NOTES:

BEN MEADOWS, AND FORESTRY SUPPLIERS.

STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,

RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.

THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH

1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) 316 SST 1
HSS 4 x 4 x 1/4"
AT 3:1 TO MATCH BASIN SLOPE

FACE OF STRUCTURE - SLOPE

COUPLING

TRANSITION

FLEXIBLE
TYP

SST BATTEN,

TOE OF EMBANKMENT
TYP

SST BATTEN,

TRASH RACK
#5@12 EW #5 @ 12" EWEF
1/4
TYP
1 PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"

TRASH RACK

FLEXIBLE COUPLING
KP
INV 568.46

PAU INLET STRUCTURE
SCALE:

FILE:

H
3/4" = 1'-0"
866F1091S103
PLAN
91C07
kjackson
61 JKN
GEOTECHNICAL REPORT.

3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.

FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER

2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.

DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.

PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA.. FINAL

CALCULATIONS STAMPED AND SIGNED BY A REGISTERED

CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.

1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
BOTTOM OF POND EL 570.78
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:07-07'00'

Page 486 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:00:58
PM
JKN
JLG
KP
99S01
62 STRUCTURAL

ELECTRICAL BUILDING

FOUNDATION PLAN
8660F1099S01.dw
g
kjackson 8660F10
24'-0"
14'-0"

ELECTRICAL ROOM
3'-4" 4'-4"
6'-8" 1'-4"
B
8660F1001S100

FOUNDATION PLAN
1/2" = 1'-0"
(TYP)
1'-0"
(TYP
)
1'-0"
P
99S03

FULLY GROUTED
12" CMU WALL (TYP)
TYP
CR314
GENERAL NOTES:

KEY NOTES:

MECHANICAL EQUIPMENT.

6. COORDINATE OPENING SIZE AND LOCATION WITH
MANUFACTURER'S ANCHORAGE REQUIREMENTS.

MECHANICAL DRAWINGS AND EQUIPMENT

EQUIPMENT PADS WITH ELECTRICAL AND

5. COORDINATE LOCATION AND DIMENSIONS OF ALL
FINISHED WITH WATER REPELLANT.

4. EXTERIOR CONCRETE MASONRY UNITS TO BE
S451/TYPE AND S461/TYPE.

S410/TYPE, S412/TYPE, S430/TYPE, S440/TYPE,

3. FOR MASONRY DETAILS, SEE DETAILS S400/TYPE,

2. FOR DOOR SCHEDULES, REFER TO DRAWING 99A01.

DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
#
FXE
FXE
4 1
2 101
3 3
101-1
101-2
EQUIPMENT REQUIREMENTS.

REFERENCE ELECTRICAL DRAWINGS FOR
REFER TO SPECIFICATION SECTION 10520.

FIRE EXTINGUISHER PER DETAIL AN400/TYPE.

SPECIFICATION SECTION 08110.

HOLLOW METAL DOOR AND FRAME REFER TO
IN FULLY GROUTED CMU WALL.

PROVIDE #5@16" EACH WAY EACH FACE REBAR
UNIT. REFER TO SPECIFICATION SECTION 04220.
12''x8''x16'' STANDARD CONCRETE MASONRY
TYP
S350
TYP
S350
(TYP)
2 (TYP)
MCJ
(TYP)
12'-0"
G
99A02
H
99A02
E
99A02
F
99A02

TYP ALL AROUND
TOC 602.25
(TYP)
MCJ
TYP
CR314
1'-0"
TOC 602.25
1'-4"

1. 2.

3. 4.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:55-07'00'

Page 487 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:45:47
PM
GENERAL NOTES:

S720/TYP.

WIDTH. PROVIDE ROOF OPENING AS PER DETAIL
SHALL BE LIMITED TO 12" IN DIAMETER OR
MANUFACTURER. MAXIMUM ROOF OPENING

EQUIPMENT AND APPROVED HVAC

LOCATION AS REQUIRED WITH MECHANICAL

5. COORDINATE ROOF OPENING SIZE AND
DIRECTION.

4. INDICATES METAL DECK SPAN
DRAWING 00S01.

3. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 98A01.

2. FOR GENERAL ARCHITECTURAL NOTES, REFER
ROOF DESIGN DEAD LOAD = 20 PSF
ROOF DESIGN LIVE LOAD = 20 PSF

1. ROOF LOADING:

JKN
JLG
KP
99S02
63 STRUCTURAL

ELECTRICAL BUILDING

ROOF FRAMING AND ROOF PLANS
8660F1099S02.dw
g
kjackson 8660F10
C
8660F1001S101

ROOF FRAMING
1/2" = 1'-0"
4 EQ SPACES @5'-6" = 22'-0"
1 2
P
99S03
TYP
AC310
TYP
S708
TYP
S451
AROUND

TYP ALL
HPT 615.25
LPT 615.00
3 S
LO
PE
1/4'PER
FOO
T
2 4
12'-0"
CL
P
99S03
TYP
AG225

W/ CAGE
TYP
AG222
(TYP)
TAPERED RIGID INSULATION.

SLOPE OF THE ROOF SHALL BE ACHIEVED BY
RECOMMENDED BY MANUFACTURER.

SEAL SHALL INCLUDE CAULKING AND PLATE AS
WEATHERTIGHT CONDUIT PENETRATION SEAL.

ENGINEERS REVIEW A WATERPROOF AND

EXISTING CONDITIONS AND PROVIDE FOR

CONTRACTOR SHALL COORDINATE WITH
PROVIDED BY THE CONTRACTOR.

MEET APPLICABLE BUILDING CODES SHALL BE

FRAMING AND ATTACHMENTS ANCHORED TO
STRUCTURAL CALCULATIONS. SECONDARY

PROVIDE SEISMIC BRACING AS REQUIRED BY
SUSPENDED FROM ROOF PER MFR DETAIL.

REQUIREMENTS AND PLACEMENT. FCU

REFERENCE HVAC DRAWINGS FOR EQUIPMENT
MANUFACTURER.

CRICKET AS RECOMMENDED BY
PER DETAIL AG160/TYP.

PROTECTIVE BOARD AND RIGID INSULATION

TPO MEMBRANE ROOFING SYSTEM OVER
SPECIFICATION SECTION 07700.

AG220/TYP IN ACCORDANCE WITH

ALUMINUM COPING OVER PARAPET PER DETAIL
1 1/2" DEEP 18 GAUGE METAL DECK.

D
8660F1001S102
ROOF
1/2" = 1'-0"
W 10x30
W 10x30
W 10x30
3 E
Q SPAC
E
S
@
4'-8"=14'-0"
TYP
S451
(TYP)
W 10x30
W 10x30

MCJ (TYP)
TYP
S502

EXTERIOR
12" CMU WALL (TYP)

MCJ (TYP)
(TYP)
12'-0"
12'-0"
W 10x30W 10x30
TYP
S701
# KEY NOTES:

1. 2.

3. 4.

5. 6.
7 7.

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:30:40-07'00'

Page 488 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:4/5/202311:36:37
AM
GENERAL NOTES:

DRAWING 00S01.

2. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 99A01.

1. FOR GENERAL ARCHITECTURAL NOTES, REFER
JKN
JLG
KP
99S03
64 STRUCTURAL

ELECTRICAL BUILDING

SECTION
8660F1099S03.dw
g
kjackson 8660F10
P
99S01 1/2" = 1'-0"
86600F1001S300
TOC 602.25
EL 618.50 SUBGRADE PREPARATION.

1. REFER TO GEOTECHNICAL REPORT FOR
1 SLOPE

STEEL BEAM PER PLAN
#6@12" EW T&B
HOUSEKEEPING PADS.

LOCATIONS AND DIMENSIONS OF

2. REFER TO ELECTRICAL DRAWINGS FOR
TOS 616.25
2 (TYP)
TYP
AG227
TYP
AG225
TYP
AG160

CMU WALLS PER PLAN
12" FULLY GROUTED
2'-4"
99S02
# KEY NOTES:

Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:31:26-07'00'

Page 489 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:42:14
AM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
JKN
NGB
KP
99S04
65 STRUCTURAL

RECYCLED WATER PUMP STATION

PLAN AND SECTIONS
8660F1099S04.dwg
kjackson
8660F10
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

Q
8660F1001S130
1/4" = 1'-0"
R
- 1/2" = 1'-0"
8660F1001S330
GENERAL NOTES:

AND LOCATION.

2. REFER TO SHEET 99M02 FOR PUMP DETAILS
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
VERIFY DIMENSIONS WITH MANUFACTURER.

END REBAR WITH STD HOOK.

OPENING WITH MECHANICAL.

CONTRACTOR TO COORDINATE SIZE OF THE
HEIGHT OF THE CURB WALL IS 2'-0".

CURB WALL WITH PUMP MANUFACTURER. MAX

CONTRACTOR TO COORDINATE HEIGHT OF THE
TYP
S180
2 #6@12" EF VERT
(TYP)
3 1
#6@12" EF CIRC (TYP)
R
-

PER MFR
TYP
S130
#5@8" CIRCULAR

BARS EF (TYP)
#4 STIRRUPS
@8" (TYP)
1'-0"

PROVIDE

TEMPORARY

SHORING AS

NEEDED AND

CLSM BACKFILL
6" COMPACTED ABC

PROVIDE TEMPORARY

SHORING AS NEEDED

AND CLSM BACKFILL
10" COMPACTED ABC
SCARIFY 8" AND COMPACT TO
95% RELATIVE COMPACTION
1'-3"
1'-3"

W/O WSTP
1" EXP JT
TYP
S140
(TYP)

NATIVE SOIL
EL 587.08
S
-
S
- 1/2" = 1'-0"
8660F1001S330
#6@12" EW T&B
(TYP
)
10'-0"
51'-10"
#6@12" EF CIRC (TYP)
#6@12" EF VERT (TYP)
7'-6"
7'-6"
4 5'-6" 6'-4"
4 LP EL 602.33
HP EL 602.60
10'-0" 5'-6" 4'-6"
20'-0"
LP EL 602.33

SLOPE SLOPE
FG 602.00
TYP
S141
# KEY NOTES:

1. 2.

3. 4.
#6@12" EW T&B
1'-3"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:32:21-07'00'

Page 490 of 3073 ends

2'-0"
R47'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/23/20234:28:55PM
GENERAL NOTES:

CONSTRUCTION.

12. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.

11. FINAL TANK DESIGN TO BE DETERMINED BY THE
DESIGN AND APPROVED BY THE OWNER.

HATCHES TO BE COORDINATED WITH TANK

10. FINAL COORDINATES FOR THE ACCESS
PIPING.

9. SEE SHEET 99C19 FOR CONTINUATION OF YARD
CONCRETE TANK.

DETAILED DESIGN FOR THE PRESTRESSED

8. COORDINATE ALL PIPE PENETRATIONS WITH
S110/TYP.

7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.

S107/TYP. WATERSTOP SHALL BE CONTINUOUS

6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS

5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.

STEEL, PRESTRESSING CONNECTIONS, SEISMIC

WATERSTOPS, BEARING PADS, REINFORCING

ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED

4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.

WITH THE REQUIREMENTS SET FORTH IN

QUALIFIED TANK CONTRACTOR IN ACCORDANCE

TANK DESIGNED AND CONSTRUCTED BY

STRAND WOUND, PRESTRESSED CONCRETE

3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.

2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S05
66 STRUCTURAL

STORAGE TANK

FOUNDATION PLAN
8660F1099S05.dwgkjackson 8660F10 T 8660F1001S110 FOUNDATION 1/8" = 1'-0" 8'-0"
5°
5° 5° 10°

RIDGE LINE OF QUADRANT

BOUNDARY BELOW (TYP)

SEE CIVIL DRAWINGS FOR

COORDINATE POINT

INTERIOR SST

LADDER W/ FALL

PROTECTION SYSTEM

EXTERIOR ALUM LADDER

SWALE LINE
(TYP ALL AROUND)
16" PW
16" RW

TANK INLET

TANK OUTLET
W
99S07
X
99S07
X
99S07
V
99S07
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,

MATCH CL OF OVERFLOW

TO BOOSTER PUMP
STATION SEE DWG 99C19

FOR CONTINUATION
4" RW

FOR CONTINUATION
SYSTEM SEE DWG 99C19

FROM DISTRIBUTION
16" OF
RISER

WASHDOWN
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,

MATCH CL OF OVERFLOW
51°

5.73°
33 .27°
15°
15°
45°

TANK INLET
FLOW
FLOW
Y
99S08

WATER SAMPLING STATION

PRESSURE TRANSMITTER CONNECTIONS

FUTURE CHLORINATOR CONNECTION
16" OF
5 99S08

CAST-IN-PLACE

TYPE I CONCRETE

COREWALL
PER AWWA D110

TANK FOOTING

COLS AS

REQUIRED
SQUARE

FOOTING
(TYP) AS REQUIRED
15'-0"

ASREQUIRED
15'-0"
JKN

Page 491 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/23/20234:29:43PM
GENERAL NOTES:

CONSTRUCTION.

9. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.

8. FINAL TANK DESIGN TO BE DETERMINED BY THE
S110/TYP.

7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.

S107/TYP. WATERSTOP SHALL BE CONTINUOUS

6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS

5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.

STEEL, PRESTRESSING CONNECTIONS, SEISMIC

WATERSTOPS, BEARING PADS, REINFORCING

ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED

4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.

WITH THE REQUIREMENTS SET FORTH IN

QUALIFIED TANK CONTRACTOR IN ACCORDANCE

TANK DESIGNED AND CONSTRUCTED BY

STRAND WOUND, PRESTRESSED CONCRETE

3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.

2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S06
67 STRUCTURAL

STORAGE TANK

ROOF PLAN
8660F1099S06.dwgkjackson 8660F10 U 8660F1001S110 ROOF1/8" = 1'-0"

ALUM ROOF VENT
4'x8' DOUBLE LEAF

ALUM ACCESS HATCH

EXTERIOR ALUM LADDER W/
"SAF-T-CLIMB" LADDER SYSTEM
& CLIMBING DEVICE OR EQUAL

PROVIDE HORIZONTAL LIFELINE

FALL PROTECTION SYSTEM W/

CABLE & ANCHOR POINTS AS
REQD, SEE NOTE 5 (TYP)

ROOF DRAIN SCUPPER W/
GALV STEEL PIPE (TYP 10

PLACES EQUALLY SPACED)
W
99S07
V
99S07

AS REQUIRED

ASREQUIORED

TANK WALL

ROOF SLAB
JKN

Page 492 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:4/5/202311:41:16AM
GENERAL NOTES:

8. FOR BIDDING PURPOSES, NOT FOR CONSTRUCTION.

7. FINAL TANK DESIGN TO BE DETERMINED BY THE TANK DESIGNER.

EVER APPLICABLE .

6. CONTRACTOR TO PROVIDE SHORING FOR ALL EARTHWORK WHERE SHALL BE CONTINUOUS WITH CLOSED LOOP ALL AROUND JOINTS.

5. FOR WATERSTOP SEE DETAILS S106/TYP & S107/TYP. WATERSTOP MINIMUM CONCRETE COVER AT TANK CONNECTION).

PLACEMENT OF CONCRETE FOR PIPE ENCASEMENT (VERIFY

4. INSPECTION OF REBAR BY ENGINEER REQUIRED PRIOR TO

2. PERIMETER 4000 PSF 1. CENTER 2000 PSF
i. ALLOWABLE GROSS BEARING PRESSURE
d. GEOTECHNICAL DESIGN DATA:
7-16 CH 21.2 METHOD 1. * SITE-SPECIFIC GROUND MOTION HAZARD ANALYSIS PER ASCE vii. LONG-PERIOD TRANSITION PERIOD, TL: 8 SECONDS (ANCHORED FLEXIBLE-BASE TANK)
vi. RESPONSE MODIFICATION FACTOR, R: 3.25 v. SEISMIC DESIGN CATEGORY: D iv. DESIGN SPECTRAL RESPONSE ACCELERATION, SD1*: 1.58g
iii. DESIGN SPECTRAL RESPONSE ACCELERATION, SDS*: 1.48g ii. SEISMIC IMPORTANCE FACTOR, Ie: 1.50 i. RISK CATEGORY: IV c. EARTHQUAKE DESIGN DATA (ASCE 7-16):
ii. EXPOSURE: C i. ULTIMATE DESIGN WIND SPEED, Vult (3-SEC GUST): 104 MPH b. WIND DESIGN DATA:
300 LBS CONCENTRATED LOAD.
a. ROOF LIVE LOAD: 40PSF (NON-REDUCIBLE) WITH A
FOR THE TANK DESIGN.

CODE. SEE SPECIFICATION 13027 FOR ADDITIONAL DESIGN CRITERIA STRUCTURAL DESIGN CRITERIA PER 2019 CALIFORNIA BUILDING

3. THE TANK DESIGN SHALL, AS A MINIMUM, MEET THE FOLLOWING

2. SEE ADDITIONAL NOTES ON SHEET 99S05.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. 99S07
68 STRUCTURAL

STORAGE TANK

SECTIONS AND DETAILS
8660F1099S07.dwg 8660F10
115'-0" (INSIDE DIAMETER)
TOW 625.00TOC 624.25
621.75

SPRING LINE
V
99S05 1/8" = 1'-0"
8660F1001S310
16" RW
OUTLET
16" RW
INLET
3- 3/8" = 1'-0"
8660F1001S310
4- 1/2" = 1'-0"
8660F1001S310
X
99S05 3/8" = 1'-0"
8660F1001S310

TANK OUTLET PIPE
W
99S05 1/8" = 1'-0"
8660F1001S310
1% SLOPE
3- 3- 4- 1
4 1% SLOPE 1% SLOPE

TO SWALE

BEGIN SLOPE
2'-0"
10'-0"

TO SWALE

BEGIN SLOPE
2'-0"

FINISH GRADE, SEE CIVIL DWGS
2'-0"MIN
16" W
SLOPE
2%

MAX OPERATION
WATER EL 620.00
SPRING
LINE
HPT
595.50
LPT 595.00
(SWALE LINE

ALL AROUND)
TOC 595.08
(ALL AROUND)
TOC 595.08

CONCRETE WALL

FOOTING AND SLAB

CONCRETE WALL

FOOTING AND SLAB

CONCRETE WALL

ASSEMBLY

ABC LEVELING COURSE

OVER COMPACTED EARTH

SUBGRADE COMPACTED
TO 95% OF MAXIMUM DRY
DENSITY PER ASTM D1557

ABC LEVELING COURSE OVER
COMPACTED EARTH SUBGRADECOMPACTED TO 95% OF MAXIMUM
DRY DENSITY PER ASTM D1557
10" OF SCARIFIED NATIVE MATERIAL
COMPACTED TO 95% RELATIVE COMPACTION

AND MOISTURE CONDITIONED

NATIVE SUBGRADE

CONCRETE WALL

ASSEMBLY

ANGLE POINT

PER OSHA

WHERE SHORING

IS USED (TYP)

SAFE CONSTRUCTIONSLOPE (TYP)

STRUCTURAL BACKFILL

UNLESS OTHERWISE

SPECIFIED COMPACT TO
95% RELATIVE

COMPACTION
(8) #6 CONTINUOUS

REINFORCMENT

CONCRETE WALL

FOOTING AND SLAB

EXTERIOR ALUMINUM

LADDER WITH
"SAF-T-CLIMB"

LADDER SYSTEM AND

CLIMBING DEVICE

OR EQUAL

ALUMINUMANTI-CLIMB DOOR

INTERIOR LADDER WITH
"SAF-T-CLIMB" DEVICE

PROVIDED REMOVABLE

TOP EXTENSION SECTION

ALUMINUM GUARDRAIL
4'x8' DOUBLE LEAF

ALUMINUM ACCESS HATCH
30-MIL MEMBRANE LINER
6-MIL POLYETHYLENE

SHEETING AT

CONTRACTOR OPTION
1 4
TYP
MP140
SAFE

CONSTRUCTION

SLOPE (TYP)

EXTEND CONCRETE

WALL FOOTING AS

REQUIRED

STRUCTURAL BACKFILL

UNLESS OTHERWISE

SPECIFIED COMPACT TO
95% RELATIVE COMPACTION

ENCASEMENT

REINFORCING STEEL
MUST BE INSTALLED 2"MINIMUM FROM ANY

PORTION OF PIPE

WATERSTOP

ANCHORED

FLEXIBLE-BASE

CONNECTION
6 99S08
5 99S08
SLOPE
2%
99S06

WATERSTOP (TYP)

FILTER FABRIC

WATERSTOP

ANCHORED

FLEXIBLE BASE

CONNECTION
JKN
NGB
KP
kjackson

Page 493 of 3073 ends

(TYP)
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:4/5/202311:47:28AM
99S08
69 STRUCTURAL

STORAGE TANK

SECTION AND DETAILS
8660F1099S08.dwgkjackson 8660F10
TYP
MP080
TYP
MP310
3'-0"
4" FLG TEE W/ (2) 4"

BLIND FLANGES,
TAPPED 1 12" IPT, (2) 1
1 2" BRASS NIPPLES, (2)
1 12" HOSE VALVES W/

HANDWHEEL

OPERATOR AND CAP

AND CHAIN
TYPE 304 SST
BAFFLE 1/4" PLATE

NOTCH TO FIT

INSIDE PIPE
SCALE:FILE:
5 DETAIL
99S07 3/8" = 1'-0"
8660F1000S310

TANK INLET
SCALE:FILE:
6 DETAIL
99S07 3/8" = 1'-0"
8660F1000S310

TANK OUTLET
SCALE:FILE:

Y SECTION
99S08 3/8" = 1'-0"
8660F1000S310

TANK OVERFLOW
SCALE:FILE:
7 DETAIL
99S05 3/8" = 1'-0"
8660F1000S310

TANK WASHDOWN RISER
SCALE:FILE:
8 DETAIL - 3/4" = 1'-0"
8660F1000S310

ANTI-VORTEX

TOP OF INFLUENT
16" FLARE
TOC 595.08
3'-0" 10'-0" MIN
CL 591.00
FLOW
TYP
MP140
10'-0" MIN 3'-0"
TOC 595.08
FLOW
16" LR 90° ELBOW
CL 591.00

SPOOL PIECE

PIPE FLOORPENETRATION

FLUSH TO FLOOR
8- 16" RW
TYP
MP310
TYP
MP140
16" RW
TOP OF OVERFLOW 520.00
16" FLARE
6'-0"MAX
TYP
MP250
(TYP)
16" OF
CL 604.00
INV 597.00
TYP
CS202 36"x36" CATCH BASIN
3'-4"
16" DUCKBILL

CHECK VALVE
4" RW
CL 599.00
CL 591.00
TYP
MP140
16" RW
PLAN

SECTION
16" RW
TYPE 304 SST
BAFFLE 1/4" PLATE
16" OF

PIPE CONTINUATION
SEE DWG C01 FOR
SEE DWG 99C19 FOR

PIPE CONTINUATION
SEE DWG 99C19 FOR

PIPE CONTINUATION
JKN
NGB
KP

Page 494 of 3073 ends

(TYP)
1'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/27/202311:14:25AM
GENERAL NOTES:

UTILITIES SHALL BE EXPOSED.

7. PRIOR TO DRILLING OF PIERS, ALL KNOWN
SECITON 03300.

6. FOR CONCRETE CLASS, SEE SPECIFICATION
ENGINEER.

REQUIREMENTS AND AS APPROVED BY THE
TIE IN ACCORDANCE WITH ACI 318

5. IF LAPS ARE REQUIRED FOR SPIRALS, LAP AND
80,000 PSI (ASTM615 GR 80).

4. PROVIDE SPIRALS WITH YIELD STRENGTH OF
TERMINATOR RATHER THAN STANDARD HOOK.

3. CONTRACTORS OPTION TO PROVIDE BAR END
A.H-20 LIVE LOAD
DESIGN LIVE LOADS:

2. BRIDGE STRUCTURAL DESIGN CRITERIA.

DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S09
70 STRUCTURAL
BRIDGE

PLAN AND SECTION
8660F1099S09.dwgkjackson 8660F10
A
8660F1001S120
3/8" = 1'-0"

NEW PREFAB RAILCAR

BRIDGE AND ANCHORAGEBY CONTRACTOR
EXIST
BRIDGE

FND (TYP)
1 99S02
B- 3/8" = 1' - 0"
8660F1001S320
(TYP)
9'-4"
(TYP)
3'-4"
(TYP)
3'-0"
(TYP)
6'-0"

B- (TYP
)
1'-0"
FIN GR 645.00
PROFESSIONAL ENGINEER.

SIGNED BY A CALIFORNIA REGISTERED

CALCULATIONS AND DETAILS STAMPED AND

TALL GUARD RAIL, SHOP DRAWINGS,
CONTRACTOR SHALL PROVIDE MINIMUM 3'-6"
REGISTERED PROFESSIONAL ENGINEER.

STAMPED AND SIGNED BY A CALIFORNIA

DRAWINGS, CALCULATIONS AND DETAILS

CONTRACTOR SHALL PROVIDE SHOP
TOPPING AND A CROSS SLOPE OF 2% MAXIMUM.

BRIDGE WITH 3" MINIMUM ASPHALT CONCRETE
PRE-MANUFACTURED 12' WIDE STEEL RAILCAR
CONTRACTOR TO VERIFY DIMENSION.

MINIMUM BEARING SEAT WIDTH = 20 INCHES.

C
99S02
2 10'-0"
10'-0"
1 99S02
2 (TYP)
3'-0"
12" PIPE PER CIVIL
DRAWING 99C14
90'-0"
(TYP MAX)
4'-0" D
99S02
(MAX)
1'-6"
(MAX)
1'-6"
4 3
5'-0" 1'-0"
4'-0"
TYP
MP100
TYP
P602
ELBOW FLxMJ
12" DI 90 DEG
FLxFL
4'-0" DI SPOOL
TYP
MP898
12" GV FLxFL
JOINT (BY OTHERS) FLxFL

BALANCED EXPANSION
12" FLEX TEND FORCE 1'-0" DI SPOOL FLxFL
1'-0" 5'-0"
4'-0"
TYP
P602
TYP
MP100
TYP
MP898
SPOOL FLxFL
4'-0" DI
ELBOW FLxMJ
12" DI 90 DEG JOINT (BY OTHERS) FLxFL

BALANCED EXPANSION
12" FLEX TEND FORCE
1'-0" DI SPOOL FLxFL
12" GV FLxFL
# KEY NOTES:

1. 2.

3. 4.

JKN

Page 495 of 3073 ends

3"MINCLR
6"MIN
1" TYP
1"TYP
2"
2"
3"
4"MAX
3"MIN

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.

CONSTRUCTION

IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL

UNDER THE AUTHORITY

PURPOSE OF BIDDING

RELEASED FOR THE

THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.

DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.

PlotDate:3/24/20233:28:56PM
GENERAL NOTES:

BEND INTO THE CONCRETE CORE AT ENDS.
(2) EXTRA TURNS AND A 135 DEGREE HOOK

ENSURE THAT THE SPIRAL IS TERMINATED WITH

LENGTH ON SITE PER NEW PIER LENGTHS,

8. FOR REBAR CAGES THAT ARE REDUCED IN
2460.

LOAD TESTING PER SPECIFICATION SECTION
ADDITIONAL INFORMATION. CONDUCT PIER
SPECIFICATION SECTIONS 2467A AND 2466B FOR
PRESSURE-GROUTED PILES. SEE

HOLE CONCRETE PILES OR AUGURED

7. ALL PILES SHALL BE CAST-IN-PLACE DRILLED
UTILITIES SHALL BE EXPOSED.

6. PRIOR TO DRILLING OF PIERS, ALL KNOWN
SECTION 03300.

5. FOR CONCRETE CLASS, SEE SPECIFICATION
ENGINEER.

REQUIREMENTS AND AS APPROVED BY THE
TIE IN ACCORDANCE WITH ACI 318

4. IF LAPS ARE REQUIRED FOR SPIRALS, LAP AND
80,000 PSI (ASTM615 GR 80)

3. PROVIDE SPIRALS WITH YIELD STRENGTH OF
TERMINATOR RATHER THAN STANDARD HOOK.

2. CONTRACTORS OPTION TO PROVIDE BAR END
DRAWING 00S01.

1. FOR GENERAL STRUCTURAL NOTES, REFER TO
JKN
NGB
KP
99S10
71 STRUCTURAL
BRIDGE

SECTIONS AND DETAILS
8660F1099S10.dwgkjackson 8660F10
C
S01 3/4" = 1' - 0"
8660F1001S320
E- 3/4" = 1' - 0"
8660F1001S320
3'-0"

TIES SEE SCHEDULE

PIER SCHEDULE ON THIS SHEET

FOR REINFORCEMENT SEE DRILLED
EXTEND SPIRALS 12 INCHES INTO PIER CAP.

CONNECTION OF W8X.

REQUIRED FOR FULL BEARING AND
SIDES WITH A 1/4" THICK FILLET WELD IF
WELDED TO BRIDGE BEAM AND W8X ON ALL
PROVIDE 3/8" THICK OVERSIZED STEEL PLATE
(TYP).

HOLES TO ALLOW LONGITUDINAL MOVEMENT
PER MANUFACTURER. PROVIDE SLOTTED
BRIDGE BEARING PLATE AND ANCHOR BOLTS LONGITUDINAL BAR.

AROUND THE PERIMETER ENCLOSING THE

CIRCULAR TIES SHALL BE STAGGERED
MINIMUM OVERLAP. ENDS OF ADJACENT
ENGAGE A LONGITUDINAL BAR WITH 6"

DEGREE MINIMUM STANDARD HOOKS AND
TIES ENDS SHALL TERMINATE WITH 135
1 #5@8" EW EF (TYP)

DRILLED PIER SCHEDULE
LABEL
(FT)

DIAMETER
(FT)

PIER LENGTH

REINFORCEMENT

VERTICAL

TIES OR SPIRAL
P1 3'-0" 45'-0" (16) #10 (2) #5@6"

BUNDLED SPIRAL
1- 3/4" = 1' - 0"
8660F1001S320
E- PREFAB RAIL CAR BRIDGE AND ANCHORAGE BY CONTRACTOR (8) #6@8" T&B (TYP) 2 FIN GR 645.00 FIN GR 637.00
EL 635.00EL 632.17
EL 635.00EL 632.17
PIER P1 (TYP)
PIER P1 (TYP)
D
S01 3/4" = 1' - 0"
8660F1001S320
W8x18
L3x3x3/8
W8x18

PREFAB RAIL CAR

BY CONTRACTOR
1" NEOPRENE PAD

PIPE STRAP
12" PIPE PER CIVIL
DRAWING 99C14
3/8" GUSSET

CUT TO FIT
(TYP)
3/4" DIA A325-N BOLTS

IN STD HOLE (TYP)
2'-3" MAX
1/4"
1/4"
1/4"
#6@8" T&B
#6@8" T&B
#6@8" T&B

CONTRACTOR TO MATCH
EXISTING GRADE. REPLACEEXISTING PATH TO MATCH

BRIDGE ELEVATION (TYP)
3 # KEY NOTES:

1. 2.

3. 4
1/4"
TYP

4.

Page 496 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:34
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00M01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:8660F1000M01.dgn

MECHANICAL
8660F10
CE
CE
V
V
K

SILENT CHECK VALVE

ECCENTRIC PLUG VALVE

MUD VALVE (PLAN VIEW)
ELBOW, 11.25 DEGREE
ELBOW, 22.5 DEGREE

SWING CHECK VALVE

FLEXIBLE COUPLING ADAPTER

DISMANTLING JOINT

WAFER CHECK VALVE

GLOBE VALVE
ANCHOR
CAP
CROSS

LATERAL
TEE
UNION

FLANGED COUPLING ADAPTER

GROOVED END ADAPTER

FLANGED COUPLING ADAPTER

FLEXIBLE COUPLING

EXPANSION COMPENSATOR
ELBOW, 90 DEGREE

LUBRICATED PLUG

BALL CHECK VALVE

KNIFE GATE VALVE

MIXING VALVE

DUAL CHECK VALVE

DIAPHRAGM VALVE
FLANGE
ELBOW, 45 DEGREE

EXP JOINT

PINCH VALVE

PLUG VALVE
(RUBBER GASKET)

FLANGED JOINT

ADAPTER SIDE

THRUST TIES

WITH THRUST TIES

WELDED JOINT

CONTROL VALVE

GATE VALVE

BALL VALVE

CHARACTERIZED BALL

BUTTERFLY VALVE

TEE DOWN

METAL BELLOWS EXP JOINT

FLEXIBLE COUPLING WITH

ELASTOMER BELLOWS

HUB & SPIGOT JOINT

GROOVED END JOINT

CONCENTRIC REDUCER

ELBOW DOWN

ELBOW UP
TEE UP

LATERAL DOWN

LATERAL UP
VALVE
(RESTRAINED)

PUSH-ON JOINT
3-WAY GLOBE TYPE

NEEDLE VALVE

PREVENTER

CHECK BACKFLOW
M
S
X
M
PUMP: ROTARY
PUMP: METERING
CAVITY
PUMP: CENTRIFUGAL
PUMP: PLUNGER

VENTURI TUBE
STRAINER: WYE TYPE
STRAINER: WYE TYPE

WITH BLOWOFF
WEIR

SLUICE GATE
PUMP: DIAPHRAGM
VALVE: TELESCOPING
VALVE: PLUG ECCENTRIC
VALVE: SWING CHECK
VALVE: AIR RELIEF
VALVE: ANGLE

PRESSURE-REDUCING REGULATOR

PULSATION DAMPENER
PRIMARY FLOW ELEMENT:

PUMP: RECIPROCATING
PUMP: PROGRESSIVE
X = U - ULTRASONIC
X = TH - THERMAL
X = R - ROTAMETER
X = M - MAGNETIC
X = C - CORIOLIS
PRIMARY FLOW ELEMENT:

PUMP: SUBMERSIBLE
PUMP: SCREW
FLUME
PRIMARY FLOW ELEMENT:

ORIFICE PLATE
X = PT - PITOT TUBE

ROTARY CHEMICAL

RUPTURE DISK

SLIDE GATE

SAMPLE PORT

SIGHT GLASS
FEEDER
PRIMARY FLOW ELEMENT:

X = T - TURBINE
X = P - PROPELLER
PRIMARY FLOW ELEMENT:

X = D - DENSITY
VALVE: CONE
VALVE: GATE

FLOW SWITCH

FIRE HYDRANT
RADAR
PRIMARY LEVEL ELEMENT:

THERMOMETER

W/ EXTERNAL PRESSURE TAP

REGULATOR W/EXTERNAL

BACKPRESSURE REGULATOR
VALVE: THREE WAY

BACKPRESSURE REGULATOR
PUMP: PERISTALTIC TUBE METERING
VALVE: THREE WAY
VALVE: THREE WAY

MOTOR OPERATED

SELF-CONTAINED

AIR OPERATED

SOLENOID OPERATED
VALVE: BUTTERFLY
VALVE: BALL CHECK
VALVE: BALL
VALVE: PLUG CONCENTRIC
VALVE: PRESSURE RELIEF
VALVE: VACUUM

PRESSURE TAP

PRESSURE-REDUCING

PRESSURE-REDUCING
VALVE: PINCH
VALVE: NEEDLE
REGULATOR: SELF-CONTAINED
VALVE: FLAPPER CHECK
VALVE: DIAPHRAGM
VALVE: FOUR WAY
VALVE: GLOBE
VALVE: HOSE

DIFFUSER

AIR VENT

OR FLUSHING

RECIPROCATING
DRAIN
BLOWER

QUICK DISCONNECT
PRIMARY LEVEL ELEMENT:

HIGH PRESSURE AIR

BATCHMETER

AIR OR CHEMICAL
COMPRESSOR:

ELECTRIC MOTOR

EXPANSION JOINT,

EQUIPMENT DRAIN
PUMP: VERTICAL LIFT
PIPE REDUCER: CONCENTRIC

FLEXIBLE VIBRATION

COMPRESSOR/TURBINE

CALIBRATION COLUMN

DIAPHRAGM SEAL
JOINT

EJECTOR OR EDUCTOR

FLAME ARRESTER

FLOOR DRAIN

FLAME ARRESTER WITH

PRESSURE

THERMALLY OPERATED VALVE
FAN: EXHAUST/SUPPLY
FILTER
WEIR

FLOAT SWITCH

ULTRASONIC
PRIMARY LEVEL ELEMENT:

PRIMARY LEVEL ELEMENT:

OIL OR MOISTURE TRAP
GAUGE: PRESSURE
GAUGE: DIFFERENTIAL
MIXER
PRIMARY LEVEL ELEMENT:

BUBBLER

BASKET STRAINER
PRIMARY LEVEL ELEMENT:

ELECTRODE
PRIMARY LEVEL ELEMENT:

FLUID

DOUBLE LINE SINGLE LINE DESCRIPTION DOUBLE LINE SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION SINGLE LINE DESCRIPTION

PROCESS LINE SYMBOLS

LINE SYMBOLS
CONTINUATION TO DWG NO.

CONTINUATION FROM DWG NO.

UNIQUE IDENTIFIER

CHEMICAL INJECTION POINT

CONTINUATION TAG

PIPE ABOVE OR BELOW GROUND
DEMO

EXISTING
FUTURE

OR STRUCTURE

PIPE UNDERNEATH SLAB

PRIMARY PROCESS FLOW IN CHANNEL

SECONDARY PROCESS FLOW IN CHANNEL

PRIMARY PROCESS FLOW IN PIPE

SECONDARY PROCESS FLOW IN PIPE

PIPE DESIGNATOR

EQUIPMENT / VALVE TAG

PIPE SIZE FLOW STREAM

PIPE MATERIAL CHANGE
M

XXX-XX-XXXX
X" XXX
C
B
A
DWG NO.

CHEMICAL
(FOT. FOB)

ECCENTRIC REDUCER
(FOT, FOB)
PIPE REDUCER: ECCENTRIC
VALVE: THREE WAY

PIPING SYMBOLS MECHANICAL SYMBOLS IDENTIFICATION SYMBOLS

INVERTED COLUMN
eparker

GENERAL MECHANICAL SYMBOLS
JD
72 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:50-04'00'

Page 497 of 3073 ends

XX" INSULATION (INSIDE) XX" INSULATION (OUTSIDE)

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405

HUMIDISTAT
THERMOSTAT 60" ABOVE FINISH FLOOR

ROOF VENT OR ROOF FAN

UNIT HEATER (HORIZONTAL TYPE)

INLINE/AXIAL FAN

ROOF/SIDEWALL FAN

CENTRIFUGAL FAN

DIRECT EXPANSION COIL

COOLING COIL

CONTROL PANEL

SOLENOID VALVE

GAS HEATER

ELECTRIC HEATER
FILTER

MOTOR OPERATED VALVE

UNIT HEATER (VERTICAL TYPE)

TURNING VANES

FLEXIBLE DUCT

ACCESS DOOR

FLEXIBLE CONNECTION

SIDE MOUNT DEVICE

ROUND DUCT

DIRECTION OF FLOW

TO SPACE

FROM SPACE
20x12 16 DIA
20x12 16x8
AD
AD
R
20x12
20x12
12x20

MOTORIZED

BACKDRAFT

BALANCING
APPEAR ON THE CONTRACT DRAWINGS.

ABBREVIATIONS. NOT ALL ITEMS SHOWN HERE
NOTE:THIS IS A GENERAL LIST OF SYMBOLS AND
OR
FD

DAMPERS

SUPPLY RETURN EXHAUST
M
M

FIRE W/ ACCESS DOOR

DUCT SMOKE DETECTOR

9. PROVIDE TURNING VANES IN ALL ELBOWS. (SHOWN OR NOT)

8. COORDINATE FINAL LOUVER SIZE AND LOCATION WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.

OUT AT ALL LOCATIONS WHERE THEY APPLY.

7. TYPICAL DETAILS SHALL BE USED FOR ALL PERMANENT WORK EVEN THOUGH THEY ARE NOT CALLED

6. THIS IS A GENERAL LIST OF SYMBOLS. NOT ALL ITEMS SHOWN HERE APPEAR ON CONTRACT DRAWINGS.

FURNISHED AND INSTALLED BY THE CONTRACTOR AS SPECIFIED.

OTHERWISE DETAILED ON THE DRAWINGS ALL PIPE AND DUCT SUPPORTS SHALL BE DESIGNED,

5. NOT ALL AND ONLY CERTAIN TYPES OF SUPPORTS ARE SHOWN ON THE HVAC DRAWINGS. UNLESS AS SHOWN ON THE TYPICAL DETAILS.

4. UNLESS OTHERWISE SHOWN ON THE DRAWINGS ALL FLOOR SLAB AND WALL PENETRATIONS SHALL BE HVAC SYSTEMS TO PROVIDE THE COMPLETE SYSTEM.

NOT EVERY FITTING AND OFFSET IS SHOWN. THE CONTRACTOR SHALL FURNISH, INSTALL AND TEST ALL ETC. REQUIRED FOR THE COMPLETE SYSTEM. SMALL PIPING IS SHOWN APPROXIMATELY TO SCALE BUT

3. HVAC PIPING AND DUCTWORK DRAWINGS DO NOT SHOW ALL DRAINS, VENTS, OFFSETS AND FITTINGS PIPE TO OTHER TYPES OF METALLIC PIPING.

2. DIELECTRIC COUPLINGS, FLANGES OR UNIONS SHALL BE INSTALLED AT ALL CONNECTIONS OF COPPER STRUCTURAL DRAWINGS.

EQUIPMENT SHALL BE SET ON CONCRETE PADS CONFORMING TO DETAILS SHOWN ON THE TYPICAL SHALL BE DETERMINED BY THE CONTRACTOR FOR THE EQUIPMENT FURNISHED. ALL FLOOR MOUNTED

1. SIZES OF EQUIPMENT PADS INDICATED ON THE DRAWINGS ARE APPROXIMATE. EXACT DIMENSIONS

FIRST NUMBER IS TOP

DUCT SECTION, NEGATIVE PRESS

FIRST NUMBER IS TOP

DUCT SECTION, POSITIVE PRESS

RISE, (D) DROP

ELEVATION CHANGE (R)

IS SIDE SHOWN

DUCT SIZE- FIRST NUMBER

COMPRESSOR

A/C OR HEAT PUMP

TRANSFER GRILLE

ARROWS INDICATE FLOW DIRECTION

SUPPLY DIFFUSER OR GRILLE

ARROWS INDICATE FLOW DIRECTION

RETURN DIFFUSER OR GRILLE

ARROWS INDICATE FLOW DIRECTION

EXHAUST DIFFUSER OR GRILLE

OR DUCT TAKEOFF

REGISTER, GRILLE, DIFFUSER

BOTTOM MOUNT DEVICE

TRANSITION

RECTANGULAR

RECTANGULAR TO

ROUND TRANSITION

RECTANGULAR TO

PRESSURE)

DIAGONAL FOR NEGATIVE

ELBOW TURNED UP (USE ONE

POSITIVE PRESSURE DUCT -

PRESSURE)

DIAGONAL FOR NEGATIVE

ELBOW TURNED DOWN (USE ONE

POSITIVE PRESSURE DUCT -

INSTALLATION

CONFIRM ORIENTATION OF

SMOKE DETECTOR

INSTALLATION

CONFIRM ORIENTATION OF
SMOKE

INSTALLATION

CONFIRM ORIENTATION OF

COMBINATION SMOKE AND FIRE
T
S
M
H

TYPE OF REGISTER
SIDEWALL-ADJUSTABLE;
CFM FLOW PATTERN;

BOOT (IF REQ'D)

NECK SIZE

C-CORNER
(AS DESCRIBED IN

OR GRILLE
400/4
SR-1(B)/12x12

SPECIFICATIONS)

LEGEND FOR REGISTERS & GRILLES

PRESSURE DIFFERENTIAL SWITCH
PD

AIR FLOW SWITCH AFS
C
C
D
X

DUCT UP THRU ROOF OR FLOOR

ABBREVIATIONS

BDD BACKDRAFT DAMPER

BOD BOTTOM OF DUCT

AFF ABOVE FINISHED FLOOR

BD BALANCING DAMPER
AT
CH

DG DOOR GRILLE

EA EXHAUST AIR

FA FOUL AIR
MD

RA RETURN AIR

RR RETURN REGISTER OR GRILLE

SA SUPPLY AIR
SD
SFD
SR

SMOKE DAMPER OR SMOKE DETECTOR

SMOKE & FIRE DAMPER COMBINATION

SUPPLY REGISTER, GRILLE OR DIFFUSER

AFS AIR FLOW SWITCH

AHU AIR HANDLING UNIT

BLR BOILER

EF EXHAUST FAN

EUH ELECTRIC UNIT HEATER
NC
NO

NORMALLY CLOSED

NORMALLY OPEN

MAU MAKEUP AIR UNIT

MOTORIZED DAMPER

OA OUTSIDE AIR

PPU POSITIVE PRESSURIZATION UNIT

WUH WATER UNIT HEATER

AC AIR CONDITIONING

CO CARBON MONOXIDE DETECTOR

CHILLER
CT
CS
CU

COOLING TOWER

CURRENT SENSOR

CONDENSING UNIT

DP DIFFERENTIAL PRESSURE

ECU EVAPORATIVE COOLING UNIT

FD FIRE DAMPER

FCU FAN COIL UNIT

GUH GAS UNIT HEATER

HP HEAT PUMP

OCF ODOR CONTROL FAN

SF SUPPLY FAN

VAV VARIABLE AIR VOLUME

LOUVER/BRICK VENT - OPERABLE

LOUVER/BRICK VENT - FIXED

DUCT DOWN

DUCT UP

CURRENT SENSOR CS

SIZE VARIES
(INSIDE) OR (OUTSIDE)

DUCT INSULATION
@
D
A
B
C
E
F
M
P
R
S
N
O
W
G
H
V

NOTES DUCTWORK SYMBOLS EQUIPMENT SYMBOLS REGISTERS, GRILLES & LOUVERS SYMBOLS

FEATURE SYMBOL FEATURE SYMBOL FEATURE SYMBOL
CE
CE
JD
00M02
73 MECHANICAL

GENERAL HVAC NOTES, ABBREVIATIONS,

AND SYMBOLS
8660F1000M02.dw
g 8660F10
P
lotD
ate:2/20/2023
3:24:43
PM
eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:56:55-04'00'

Page 498 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:11
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AL

MECHANICAL

PLANS AND SECTION
8660F10 8660F1060M01.dgn
#
GENERAL NOTES:

KEY NOTES:

A
B
- 1/4" = 1'-0"
1/4" = 1'-0"
8660F1060M9101
8660F1060M9301
B
-
EX-24" FE
EX-24" FE
24" BFV
EX-12" FE

DRAIN RISER
EX-42" FE

FACILITY

CHLORINATION
FROM
EX-24" FE
EX-42" FE
EX-42" FE
EX-24" FE
EYY

DECHLORINATION STRUCTURE
M
M

STRCTURE

DECHLORINATION
24" BFV
24" BFV
EX-2" SO2
1 2
1 2
# KEY TAGS:

1. FCV-60100 DCL STRUCTURE VALVE 1
AE-60101

2. FCV-60102 DCL STRUCTURE VALVE 2

3. C
-
3 C

NOT TO SCALE

PUMP STATION

CAROUSEL
TO
2 RIVER

RUSSIAN
TO
2 3
9 CHLORINE ANALYZER 4
PUMP 5
SAMPLE
FROM
PUMP 4
SAMPLE
FROM
5 6
8 7

SCHEMATIC
8660F1060M9101
(STP)

CONTACT BASINS

CHLORINE
FROM
(STP)
(STP)
4 (STP)
INV 564.5±

3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS MATCHES THE EXISTING CONFIGURATION.

9. CONTRACTOR SHALL PROVIDE A DRAIN CONFIGURATION THAT

8. TIE INTO EXISTING THREE-WAY VALVE.

DIMENSIONS.

7. EXISTING CONCRETE PAD. CONTRACTOR TO FIELD VERIFY
AUTOMATED ACTUATION VALVE.

CHLORINATED SAMPLES. PUMP SENDS FLOW TO A THREE-WAY

6. SAMPLE PUMP 4 IS A ROTARY PUMP THAT IS USED FOR
AUTOMATED ACTUATION VALVE.

DECHLORINATED SAMPLES. PUMP SENDS FLOW TO A THREE-WAY

5. SAMPLE PUMP 5 IS A SUBMERSIBLE PUMP THAT IS USED FOR INFORMATION.

AND INSTRUMENTATION (60N01) DRAWINGS FOR ADDITIONAL
EXISTING ENCLOSURE IN PLACE. REFER TO ELECTRICAL (60E01) 17505. THE EXISTING ENCLOSURE IS TO REMAIN IN USE. PROTECT

4. REPLACE CHLORINE ANALYZER 4 PER SPECIFICATION SECTION STRUCTURE. CONTRACTOR TO FIELD VERIFY AREA.

3. AREA IS A DIAGRAMMATIC VIEW OF PAD EAST OF DECHLORINATION AND SPECIFICATION SECTION 13447.

2. VALVE IS 20 +/- FT DEEP. REFER TO SPECIFICATION SECTION 15112

1. EXISTING VALVE ABANDONED IN PLACE.

CONC VAULT

EXISTING PRECAST
JD
74 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:00-04'00'

Page 499 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
M M
M
M M M
P
lotD
ate: 06-APR
-2023 1:27:41
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
AL

MECHANICAL
8660F10 8660F1085M01.dgn

AWT PUMPS

CLARIFIER FILTER UNITS
MIX
RAPID

BACKWASH PUMPS

AIR WASH BLOWERS

FACILITY

CHLORINATION
FROM
SH SH
SAM
SAM
CLS

RECOVERY BASINS

TO WASHWATER

CONTACT BASINS

TO CHLORINE
C
C
C
C
SH
COAG
POLY
POLY
AA
CC
I
AAFEB
W
W WCC
I
AA
BW
WW
FE
FLR
FLR
FLR
FLR
LEGEND:

SAM
SAM

WW - WASHWATER

SH - SODIUM HYDROXIDE

SAM - SAMPLE

POLY - POLYMER

FLR - FILTER

FE - FINAL EFFLUENT

COAG - COAGULANT

CLS - CHLORINE SOLUTION
CCl - CHLORINE LIQUID

C - CLARIFIER

BW - BACKWASH

AA - AERATION AIR/AIR WASH
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

AWT PROCESS FLOW SCHEMATIC
M
M
M
M
JD
75 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:05-04'00'

Page 500 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:08
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M02
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M02.dgn
C
85M03
E
85M04
G
85M05
B
85M03
A 3/16"=1'-0"
EX-2" FC
8" AA
EX-24" WW
EX-1" POLY
EX-6" AA
EX-6" AA EX-6" AA
CLARIFIER NO.4 CLARIFIER NO.3 CLARIFIER NO.2 CLARIFIER NO.1 FILTER NO.4 FILTER NO.3 FILTER NO.2 FILTER NO.1
EX-12" FE EX-18" FE EX-14" BW
X KEY TAGS:

EX-24" FE
8660F1085M0101

M M M M

STORAGE TANK

FERRIC CHLORIDE

RAPID MIX DIFFUSER ASSEMBLY
12" BFV (TYP)
14" BFV (TYP)
12" BFV (TYP)
M M
M
M
M
M
M M
13 14 10 5
1 1 16
1 15 12 11

1. FCV-85211 INFLUENT VALVE NO.1

2. FV-85212 AIR VALVE NO.1

3. FV-85217 BACKWASH VALVE NO.1

5. FCV-85221 INFLUENT VALVE NO.2

6. FV-85222 AIR VALVE NO.2

7. FCV-85228 EFFLUENT VALVE NO.2

8. FV-85227 BACKWASH VALVE NO.2

9. FCV-85231 INFLUENT VALVE NO.3

10. FV-85232 AIR VALVE NO.3

12. FCV-85238 EFFLUENT VALVE NO.3

13. FCV-85241 INFLUENT VALVE NO.4

14. FV-85242 AIR VALVE NO.4

16. FCV-85248 EFFLUENT VALVE NO.4

15. FV-85247 BACKWASH VALVE NO.4

17. LCP-85106 AIR WASH BLOWER NO. 1

18. LCP-85107 AIR WASH BLOWER NO. 2

19. LCP-85108 AIR WASH BLOWER NO. 3

20. PMP-85181 COAGULANT FEED PUMP NO. 1

21. PMP-85182 COAGULANT FEED PUMP NO. 2

22. PMP-85183 COAGULANT FEED PUMP NO. 3
9 6
22 21
8 7 4 3
2 2 2 2
3 3 3 3 5

4. FCV-85218 EFFLUENT VALVE NO.1

11. FV-85237 BACKWASH VALVE NO.3

23. #
GENERAL NOTES:

KEY NOTES:
1 6" BFV (TYP) 2 1
8" AA
23 4
8" AA
FCV-25214 WEST GATE VALVE NO.1

FEED PUMPS

EXISTING CAUSTIC
EX-4" SW 6

AWT CLARIFIER/FILTER PLAN
20 8
9 ANODE (TYP)

MAGNESUIM
(TYP OF 4)

WASTE GATE
TANK

CAUSTIC STORAGE
(STP) (STP) (STP) (STP)
(PVC)
EX-12" FE
(STP)
(SST) (SST)
EX-12" FE
(STP)
(SST)
EX-12" FE
(STP)
EX-24" FE
7 1
85M04
19 17
2 1/2" FC
3" FE
(STP)
D
85M04
F
85M05
24 M M M M

24. PMP-85104 RAPID MIX PUMP
18 12 25
8" AA
11 10

TROUGH (TYP)

COLLECTION

25. FE-85105 AIR WASH VENTURI FLOW METER
eparker
11 12. REINSTALL EXISTING VENTURI FLOW METER.

11. PENETRATE WALL AS REQUIRED FOR NEW 8-INCH AIR PIPING.

REMOVED. REFER TO 85D01 AND SPECIFICATION SECTION 01140.

10. BLIND FLANGE TEE ONCE EXISTING 6-INCH PIPING HAS BEEN SECTION 11242.

9. PROVIDE A RAPID MIX PUMP PER SPECIFICATION SPECIFICATION REFER TO PHOTO 4/85D03 FOR THE PUMP THAT WILL BE REPLACED.

8. PROVIDE A COAGULANT PUMP PER SEPCIFICATION SECTION 11242.

REFER TO PHOTO 6/85D03 FOR THE TIE-IN LOCATION.

7. PROVIDE A TEE TO TIE INTO THE EXISTING AERATION AIR LINE.

6. ABANDON LINE IN PLACE. REFER TO 85D01 AND 85D02.

PROCESS.

SPECIFICATION SECTION 09960 DURING THE MEDIA REPLACEMENT

5. CONTRACTOR TO FULLY RECOAT THE CLARIFIER/FILTER TANKS PER PHOTO 6/85D03. OTHER WASTE GATES NOT SHOWN FOR CLARITY.

AWT CLARIFIER/FILTER UNIT WITH A LINEAR ACTUATOR. REFER TO

4. REPLACE EXISTING PNEUMATIC WASTE GATE ACTUATOR ON EACH

3. REPLACE ADSORPTION CLARIFIER MEDIA.

2. REPLACE FILTER MEDIA AND FILTER GRAVEL SUPPORT.

AND ACTUATORS PER SPECIFICATION SECTION 13447.

1. PROVIDE BUTTERFLY VALVE PER SPECIFICATION SECTION 15112 JD
76 AWT CLARIFIER/FILTER UNITS.

5. REFER TO SPECIFICATION SECTION 11802 FOR WORK ON THE FOUR

4. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

3. CONTRACTOR SHALL COORDINATE WITH THE CITY THE LOCATION BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

2. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKESTS CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 1994 RECORD DRAWINGS.

Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:11-04'00'

Page 501 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:54
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M03
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL

PLAN AND SECTIONS
8660F10 8660F1085M03.dgn
B
85M02 1/4"=1'-0"
C
85M02 1/4"=1'-0"

M M M M

M M M M
#
GENERAL NOTES:

KEY NOTES:
8660F1085M0300
8660F1085M0302
EX-24" CCI
EX-6" AA
EX-24" CCI
EX-12" CCI
EX-12" CCI
EX-6" AA EX-6" AA EX-6" AA
EX-20" WW EX-18" CCI
EX-18" CCI
EX-20" WW
EX-20" WW
12" BFV (TYP)
6" BFV (TYP)
EX-12" FE
EX-14" BW
EX-12" FE
EX-14" BW
EX-4" SW
EX-14" BW
EX-18" FE
EX-24" FE
EX-4" SW
EX-14" BW EX-24" FE EX-12" FE EX-14" BW
EX-12" FE
EX-14" BW
EX-12" FE
EX-14" BW
M M
M M
M M

M M M M
1 3
2 4
EX-1" VENT EX-1" VENT EX-1" VENT
EX-1" VENT
8" AA
EX-6" AA
(TYP) 1

1. REFER TO GENERAL NOTES ON 85M02.

1. FV-85219 AC AIR SCOUR VALVE NO. 1

2. FV-85229 AC AIR SCOUR VALVE NO. 2

3. FV-85239 AC AIR SCOUR VALVE NO. 3

4. FV-85249 AC AIR SCOUR VALVE NO. 4
X KEY TAGS:
(SST)
(STP) (STP)
(SST)
(STP)
(SST)
(SST)
(STP)
(STP)
(STP)
(STP)
(STP)
(STP)
(STP) (STP)
(STP)
(STP)
(STP)
(STP)
(STP) (STP) (STP)
(STP)
(SST)
(STP) (STP)
(STP)
(STP)
(STP)

AWT CLARIFIER/FILTER
TYP
2 MP272

STANDPIPE
EXISTING 42"
(TYP)
REFER TO SECTION 09960.

2. RESTORE TANK COATINGS AFTER INSTALLING PIPE SUPPORTS.

BE DETERMINED.

SCOUR LINE AS DIRECTED BY THE MANUFACTURER. LOCATION TO

1. PROVIDE NEW PENETRATION IN EXISTING AWT UNITS FOR NEW AIR JD
77 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:16-04'00'

Page 502 of 3073 ends

BLOWER NO.1

AIR WASH
BLOWER NO.3

AIR WASH

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:06
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M04
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M04.dgn
D
85M02 3/8"=1'-0"
E
85M02 3/8"=1'-0"
8" AA
8660F1085M0301 8660F1085M0303
TYP
MP132
1 SECTIONS

AIR WASH BLOWERS
8" AA
4" AA
NO.2
BLOWER

AIR WASH
NO.3
BLOWER

AIR WASH

1. REFER TO GENERAL NOTES ON 85M02.
#

1. PROVIDE OVERHEAD PIPE SUPPORTS FIVE FEET ON CENTER.

GENERAL NOTES:

KEY NOTES:
4" AA 4" AA 4" AA
JD
78 FLOW METER
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:21-04'00'

Page 503 of 3073 ends

RAPID MIXER
PUMP NO.1

COAGULANT FEED
PUMP NO.2

COAGULANT FEED
PUMP NO.3

COAGULANT FEED
9"
1'-0"
3'-6"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:27:12
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85M05
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1085M05.dgn
G
85M02 3/8"=1'-0"
8660F1085M0301
1 RAPID MIX DIFFUSER ASSEMBLY
NTS
8660F1085M0305
85M02

COAGULANT FEED PUMP AND RAPID MIX PUMP
F
85M02 1/4"=1'-0"
8660F1085M0101
TANK

CAUSTIC STORAGE

STORAGE TANK

FERRIC CHLORIDE
EX-2" FC

RAPID MIX DIFFUSER ASSEMBLY
1 85M05
2 1/2" FC
3" FE
G
85M05
EX-1" POLY

FEED PUMPS

EXISTING CAUSTIC
GENERAL NOTES:

RAPID MIX PUMP

PLAN, SECTION, AND DETAIL

1. REFER TO GENERAL NOTES ON 85M02.

CL PIPE
FLOW
(M
IN
)

WALL THICKNESS

CUT AWAY DEPICTS PIPE

DISCHARGE PIPE

FLASH MIX PUMP
3" FE

SIZE, AND MATERIAL

SEE DWGS FOR TYPE,

CHEMICAL SUPPLY LINE,

PIPING MATERIAL LIST
1 2
4 5
3 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
UNION
6" STEEL FLANGE, 150 LB, FLAT FACE, AWWA
LENGTH AS REQD, 2" TITANIUM PIPE

THREADED
1" TITANIUM WELDED OUTLET BRANCH CONNECTION,
1/2" X 1" TITANIUM NIPPLE, THREAD X BUTT

WELD TO INSIDE WALL OF PIPE
1/4" THICK X ID TITANIUM PLUG, FABRICATED AND
6" 316 STN STL, BLIND FLANGE. 150 LB, AWWA
FLANGE
2 1/2" 316 STN STL ALIGNING SOCKET , WELD TO BLIND
3" 316 STN STL, 150 LB FLANGE, FLAT FACE, AWWA
6" 316 STN STL, 150 LB BLIND FLANGE
3" STL, 150 LB FLANGE, FLAT FACE, AWWA
LENGTH AS REQD, 316 STN STL, SCHED 40
SHORT RADIUS ELBOW, 316 STN STL, SCHED 40
INTO SOCKET.

WRAPPED AROUND PIPE/TUBE PRIOR TO INSERTION
1/4" THICK FOOD GRADE, BUNA RUBBER STRIP
1 1/2" SCH 40, 316 STN STL. WELD TO ELBOW

TO BLIND FLANGE
1 1/2" THREADED HALF COUPLING, 316 STN STL, WELD
3" X 2 1/2" REDUCER, 316 STN STL, SCH 40
1 1/2" GROOVED COUPLING, 316 STN STL
3" 316 STN STL BLIND FLANGE, 150 LB, AWWA
6" STL, 150 LB FLANGE, FLAT FACE, AWWA
PIPING MATERIAL LIST NOTES:

2. PROVIDE ISOLATION GASKETS BETWEEN DISSIMILAR METALS.

PIPINHG AND EQUIPMENT.

LISTED OR SHOWN. CONTRACTOR SHALL FURNISH AND INSTALL ALL

REDUCERS, BUSHINGS AND PIPE SUPPORTS OR HANGERS ARE NOT

REQUIRED FITTINGS SUCH AS UNIONS, GASKETS, BOLTS, ELBOWS,

1. THE PIPE MATERIAL LIST FOR THIS DETAIL IS NOT COMPLETE, MANY NOTES:

SYSTEMS CO. MODEL 2.5 H-SS-90.

1. NOZZLE - FULL CONE SPRAY PATTERN. 140 GPM @ 19 PSI, SPRAYING 11 1
2 TYP
M203 (TYP)
NOZZLE
2 1'-0"
12 3
4 9
20 10
DI
316 STN STL
12 17
13 15
18 11
16 19
7 8
14 3
6 5
JD
79 eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:27-04'00'

Page 504 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:27:00
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
87M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

EYY
ELP

MECHANICAL
8660F10 8660F1087M01.dgn
B
8660F1087M0301

PLAN AND SECTION
GENERAL NOTES:
# KEY NOTES:

BACKWASH PUMP STATION
B
-
2 A
-
8660F1087M0101
3/8"=1'-0"
1/4"=1'-0"
1 3 1
2 3
EX-3/4" FE
EX-1" FE
EX-1 1/2" FE
EX-1 1/2" FE
EX-14" BW
14" BW
EX-4" BW
14" BW
# KEY TAGS:

1. PMP-87134

2. AE-87130

BACKWASH CHLORINE SAMPLE PUMP
CHLORINE ANALYZER 3
4 5 8" BFV
TYP
(TYP)MP637
M
14" BFV (TYP) 3
4 3. FV-87130 HIGH RATE BACKWASH VALVE

4. FV-87230

5. FV-87330

HIGH RATE CONTROL VALVE

LOW RATE CONTROL VALVE
(TYP.)
14"X8" CONC. RED.

4. TIE INTO EXISTING PIPE.

EQUIPMENT TO THE EXISTING SAMPLE LINES AS REQUIRED.

3. SUPPLY ADDITIONAL PIPING AND FITTINGS TO CONNECT NEW INFORMATION.

AND INSTRUMENTATION (60N01) DRAWINGS FOR ADDITIONAL
EXISTING ENCLOSURE IN PLACE. REFER TO ELECTRICAL (60E01) 17505. THE EXISTING ENCLOSURE IS TO REMAIN IN USE, PROTECT

2. REPLACE CHLORINE ANALYZER 4 PER SPECIFICATION SECTION

1. RELOCATE THE EXISTING BUTTERFLY VALVE AS SHOWN.

FABRICATION.

CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO

3. PIPE LAYOUT DRAWINGS SHALL BE PREPARED BY THE

2. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.

1. BACKGROUND IS BASED ON THE 2005 RECORD DRAWINGS.

JD
80 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:32-04'00'

Page 505 of 3073 ends

4'-0"±

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:09
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89M01
eparker
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

CA
ELP

MECHANICAL
8660F10 8660F1089M01.dgn
A
#
GENERAL NOTES:

KEY NOTES:

B
3/8" = 1'-0" - 1/2" = 1'-0"
B
-

CAROUSEL PUMP STATION

PLAN AND SECTION
8660F1089M0101
16" SE
EX-36" SE
PMP-89100
EX-12" SE
EX-24" SE
EX-36" SE
EX-16" SE
EX-16" SE
EX-16" SE
EX-48" SE
EX-24" SE
1 1
8660F1089M0301
EX-36" SE
16" SE
# KEY TAGS:

3. CAROUSEL PUMP NO. 3

2. CAROUSEL PUMP NO. 2

1. CAROUSEL PUMP NO. 1
PMP-89101
PMP-89102
1 2
2 3
PUMP NO. 3

CAROUSEL
2 2
16" DMJT
16" SCV
16" BFV
TO PAU
3 TYP
MP034
MATCH LINE STA 10+04.73 ON DWG 91C07
CL 582.50 1

3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS

3. WATER LEVEL PER THE 1994 RECORD DRAWINGS.

2. PROVIDE NEW MOTOR FOR PUMP.

1. FOR PIPING ELEVATION REFER TO DWG 91C07.

JM
81 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:37-04'00'

Page 506 of 3073 ends

1'-0"
5'-0"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 1:26:56
PM
U
ser:svcPW
Model:

Layout1 C
olorTable:gshade.ctb
D
esignS
cript:

C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
91M01
LA
S
T
SAVED
B
Y:

PROJECT NO. FILE NAME:

AL

MECHANICAL

PLAN AND SECTION
8660F10 8660F1091M01.dgn
#
GENERAL NOTES:

KEY NOTES:

A
B
- 3/8" = 1'-0"
3/8" = 1'-0"
8660F1091M0101
8660F1091M0301
CA

PAU PUMP STATION
B
-
TYP
MP370
# KEY TAGS:
1 10" SE
TYP
10" BFV
10" SCV
10" DMJT

SLIDE GATE

OPERATED

MANUALLY
10" RFCA
MP034
TYP
MP032
10" SE
16" SE
PV
C
D
IP

1. PMP-91100 PAU PUMP NO.1

FROM PAU
INV 569.03
M
IN
TYP
(TYP)MP370
CL 584.15
eparker
MATCH LINE STA 10+02 ON DWG 91C08
TOC 565.00
1 3. SEE CIVIL DRAWINGS FOR YARD PIPING CONTINUATION.

AND ORIENTATION OF VALVES AND VALVE ACTUATORS.

2. CONTRACTOR SHALL COORDINATE WITH THE CITY, THE LOCATION, BOLTS, AND GASKETS.

EXISTING PIPING COMPONENTS. DO NOT REUSE THE OLD NUTS,

FOR ALL CONNECTIONS, INCLUDING REINSTALLATION OF ANY

1. CONTRACTOR SHALL PROVIDE NEW NUTS, BOLTS, AND GASKETS TOC 582.00
TOP OF BERM 581.00

RELIEF VALVE
1" AIR
16" SE

1. REFER TO DRAWING 91C08 FOR PIPING ELEVATION.

JM
82 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:43-04'00'

Page 507 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:37:22
PM
GENERAL NOTES:

KEY NOTES:

UNLESS NOTED OTHERWISE.

1. ALL GROOVED END COUPLINGS TO BE RIGID
HMI. PROVIDE PROTECTIVE COVER.

3. SIDE MOUNT PRESSURE INDICATOR WITH
BLIND FLANGE ON PUMP CAN.

FOR FUTURE PUMP INSTALLATION. INSTALL

2. INSTALL UPSTREAM PIPING AND PUMP CAN
SUPPLIED.

EQUIPMENT

BY THE CONTRACTOR TO SUIT THE

1. FINAL DIMENSIONS SHALL BE COORDINATED
CA
BB
JM
99M01
83 MECHANICAL

RECYCLED WATER PUMP STATION

PLAN, SECTION AND DETAIL
8660F1099M01.dw
g
eparker 8660F10
(TYP)
FUTURE
C
99M02
B
-
FE-99411
SCALE:

FILE:

A PLAN
99C19 1/4" = 1'-0"
8660F1000M100
SCALE:

FILE:

B SECTION
- 3/8" = 1'-0"
8660F1000M100

VERTICAL PUMP

TURBINE
-
1 12" RW
16" RW
TYP
MP034
(TYP)
TYP
MP032
14" RW
16" RW
CL 592.00
CL 605.83
SCALE:

FILE:
1 DETAIL
- NO SCALE
-

VERTICAL PUMP MOUNTING
3/4" GAVL STEEL PIPE

AIR RELEASE VALVE
3/4" BALVE VALVE
3/4" 3000 LF FS HALF

COUPLING SHOP WELDED

TO SOUTH SIDE OF PUMP

BASE PLATE

PIPE TO SLAB

PUMP BASE PLATE
TYPE 316 SS W/ NUT AND WASHER

LOCKWASHER OR DOUBLE NUTS
(LENGTH AS REQUIRED)

PROJECT MIN TWO THREADS

ABOVE NUT (TYP)

LEVELING PLATE THICKNESS PER

MANUFACTURER
2" NON-SHRINK GROUT

PUMP PAD
TYPE 316 SS ANCHOR BOLT W/
TWO TYPE 316 SS HEX NUTS AND
LOCKWASHERS FOR LEVELING.

EMBEDMENT AND ANCHOR BOLT

SIZE PER PUMP MANUFACTURER

REQUIREMENTS
TYPE 316 SS BAR 4x4x1/2" (MIN)

TACK WELD TO BOLT
TYPE 316 SS NUT

STEEL PUMP CAN

SEAL WELD

MACHINED GROOVE

AND O-RING SEAL

FROM TANK
1 PMP-99411
PMP-99412
PMP-99413
PMP-99414
PMP-99415
12" RW
16" RW

TO DISTRIBUTION SYSTEM
SEE DWG 99C19 FOR

CONTINUATION
16" RW
FSL-99411
FSL-99412
FSL-99413
FSL-99414
3 PIT-99432
PSH-99432
16" RW
4'-6" 11'-0" 4'-6" 6'-6"
10'-0" 10'-0" 10'-0"
5'-1"
10'-0" 8'-5" 5'-6"

VERTICAL

TURBINE

PUMP (TYP)
14" BFV
(TYP)
12" BFV
(TYP)
(TYP)
12" SWING

CHECK (TYP)
16"x12" REDUCING
BEND
16"x14" RED

A / V VALVE
(TYP)
14" FC
16"x12" RED

TEE (TYP)

FLOW SWITCH

RIGID GROOVED

END COUPLING
12" FLEXIBLE

EXPANSION JOINT

VALVE BOX AND

STEM RISER
16" TEE (TYP)
16" RW
16"x12" REDUCING
BEND
12" MAG METER

A / V VALVE
(TYP)
TYP
MP034

RIGID GROOVED

END COUPLING (TYP)
16"x12" RED
12" RW 2
16" BF
16" RW
14" RW
(TYP)
12" BF
#
PI-99411
PI-99412
PI-99413
PI-99414

PRESSURE
GAUGE
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:09:12-07'00'

Page 508 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:38:51
PM
GENERAL NOTES:

UNLESS NOTED OTHERWISE.

1. ALL GROOVED END COUPLINGS TO BE RIGID
CA
BB
JD
99M02
84 MECHANICAL

RECYCLED WATER PUMP STATION

SECTION
8660F1099M02.dw
g
eparker 8660F10
SCALE:

FILE:

C SECTION
99M01 3/8" = 1'-0"
8660F1000M100
16" RW
(TYP)
TYP
MP034
TO

DISTRIBUTION
SYSTEM
CL 592.00 (TYP)

PUMP CAN (TYP)

CONCRETE ENCASE

PUMP CAN (TYP)

CONC CAN BASE

SUPPORT (TYP)
EL 588.00 (TYP)
14" RW
(TYP)

RIGID GROOVED

END COUPLING (TYP)

VERTICAL TURBINE

PUMP (TYP)
16"x12"

REDUCING
BEND

A / V VALVE
12" MAGNETIC

FLOW METER
16"x12" RED

FUTURE VERTICAL
TURBINE PUMP\
16" RW
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:09:41-07'00'

Page 509 of 3073 ends

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
P
lotD
ate:3/3/202312:39:59
PM
KEY NOTES:

5. RIGID GROOVED END COUPLING

4. 12"X16" REDUCING BEND

3. A / V VALVE (TYP)
SECTION 15117

2. 12" TANK FILL VALVE PER SPECIFICATION

1. 12" MAGNETIC FLOW METER
#
RPF
BB
JM
99M03
85 MECHANICAL

METER AND CONTROL VALVE

PLAN AND SECTION
8660F1099M03.dw
g
eparker 8660F10
SCALE:

FILE:

E METER & CONTROL VALVE SECTION
- 3/8=1'-0"
8660F10M03
SCALE:

FILE:

D METER & CONTROL VALVE PLAN
99C19 3/8=1'-0"
8660F10M03

TO TANK INLET
SEE DWG 99C19
4 -
E

FROM RW DISTRIBUTION
SYSTEM SEE DWG 99C19

FOR CONTINUATION
16" PW
3'-6"
3 2
1 5
(TYP)
3 4
18" PW
TYP
12" S300
THICK
TYP
(TYP) MP034
5'-0" MIN. 3'-0" MIN.
2 VAL-99402
1 FIT-99406
16" RW
4 3
TYP
MP034 (TYP)
5 (TYP)
4 3
16" RW
VAL-99402
FIT-99406

FROM RW DISTRIBUTION
SYSTEM SEE DWG 99C19

FOR CONTINUATION
CL=603.83
TOC=603.33
CL=595.00+/- CL=590.00

TO TANK INLET
SEE DRAWING 99C19
6'-0"
19'-2"
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 15:10:09-07'00'

Page 510 of 3073 ends

3'-4"
3'-4"

REV DATE BY DESCRIPTION
DATE

CHECKED
DRAWN

DESIGNED
8660F.10
JOB NO.

DRAWING NO.

SHEET NO.

SCALES ACCORDINGLY

VERIFY SCALES

THIS SHEET, ADJUST

IF NOT ONE INCH ON

BAR IS ONE INCH ON

ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200

CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405

REFRIGERANT LINES (TYP)
CU-99421 2
FCU-99422 1
3 3
TYP
HE620
18" DRYWELL
CU-99422 2
GENERAL NOTES:

1. MOUNT THERMOSTATS AT 48'' AFF AND LABEL
WITH ITS CONTROLLING DEVICE.

2. REFRIGERANT AND CONDENSATE DRAIN PIPING

SHALL NOT BE ROUTED ABOVE ELECTRICAL
EQUIPMENT. REFRIGERANT PIPING SHALL BE
INSULATED PER SPECIFICATION 15000.

3. PIPE SUPPORTS SHALL BE INSTALLED PER DETAIL
MP132/TYP, MP218/TYP, AND MP215/TYP. INSTALL
WALL PENETRATIONS PER DETAIL MP302/TYP.

KEY NOTES:
1 MINI-SPLIT FAN COIL UNIT SUSPENDED FROM
CEILING. BOTTOM OF UNIT AT 10'-0 AFF.
2 OUTDOOR CONDENSER UNIT. MOUNT UNIT ON
EQUIPMENT PAD PER S300/TYP.
3 1'' SCHEDULE 40 PVC CONDENSATE DRAIN
ROUTED TO 18'' DRYWELL. SLOPE LINES AT A
MINIMUM OF 2% SLOPE.
4 ROUTE REFRIGERANT LINES DOWN INTERIOR SIDE
OF WALL.
#
T
4 T
FCU-99422
TO
FCU-99421
TO
1 FCU-99421
P
lotD
ate:3/3/202312:41:13
PM
TCW
AMT
JM
99M04
86 MECHANICAL

ELECTRICAL BUILDING

HVAC FLOOR PLAN AND SCHEDULE
8660F1099M04.dw
g
eparker 8660F10
F
8660F1000H0101
1/2" = 1'-0"
TYP
S300 (TYP)
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.

Date: 2023.04.07 16:57:48-04'00'

Page 511 of 3073 ends
← All documents from this meeting