City · Energy
San Clemente
Energy contracts the San Clemente City Council took up since 2022. All San Clemente meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
7actions
6vendors
$1,627,177approved (recorded vote)
$3,094,762proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-03-03 | Electric Vehicle Choice | Consideration of a resolution awarding a purchase agreement to Electric Vehicle Choice under the cooperative Sourcewell contract for two alternative qualifying Fleet vehicles | Cooperative purchase | $725,183 | two Karsan-Damera eJest Mini Buses $326,426.67 per vehicle | Approved CARRIED 5-0 | staff report · staff report · agenda · minutes · packet |
| 2025-06-17 | Calstart | Resolution No. 25-103 directing staff to negotiate budget revisions to the CMO Voucher Pilot Program grant to enable purchase of alternative qualifying electric Fleet vehicles | Amendment | $628,000 not to exceed | two electric shuttles | No vote recorded | staff report · packet · packet · packet · city original |
| 2025-03-04 | Calstart | CMO Mobility Project Voucher Agreement with CALSTART, Inc. (San Clemente NEV Shuttles) Fleet vehicles | Award | $1,800,000 not to exceed | light or medium duty battery electric vehicles for the NEV Circulator … | No vote recorded | staff report · staff report · staff report · staff report · packet |
| 2024-06-18 | ACE Capital Engineering | CONTRACT AWARD - CITY HALL STANDBY GENERATOR ADDITION AND ELECTRICAL DISTRIBUTION SYSTEM UPGRADE AND APPROVING A 15% PROJECT CONTINGENCY Microgrids and backup power | Award | $551,994 not to exceed | 350kW generator with 72-hour run sub-base fuel tank | Approved CARRIED 5-0; AYE: Duncan, Enmeier, Knoblock, Loeffler and Mayor Cabral; NOE:… | staff report · staff report · staff report · agenda · minutes |
| 2022-08-16 | Caterpillar | Purchase of a Standby Generator and Electrical Distribution System for the City Hall Building Located at 910 Calle Negocio Microgrids and backup power | Cooperative purchase | $350,000 not to exceed | 350kW generator with 72-hour run sub-base fuel tank | Approved CARRIED 5-0 | staff report · minutes · packet · packet · packet |
| 2022-08-16 | Olinn Power Systems | City of San Clemente City Hall generator purchase via Sourcewell contract 120617-CAT (Quotation 220300R1) Microgrids and backup power | Cooperative purchase | $312,762 | 4 New Caterpillar Model C13 Diesel Standby Generator Sets, 350kW | No vote recorded | packet · packet · packet · packet · city original |
| 2022-07-19 | O'Connell Engineering and Construction | Supplemental appropriation and change order for Cyprus Shore emergency pump station bypass operation Microgrids and backup power | Amendment | $354,000 not to exceed | No vote recorded | packet · packet · packet · packet · packet |