Cities Index.
City · Energy

San Clemente

Energy contracts the San Clemente City Council took up since 2022. All San Clemente meetings.

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
7actions
6vendors
$1,627,177approved (recorded vote)
$3,094,762proposed, no vote in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateVendorItemActionAmountSize · price · savingsOutcomeSources
2026-03-03Electric Vehicle ChoiceConsideration of a resolution awarding a purchase agreement to Electric Vehicle Choice under the cooperative Sourcewell contract for two alternative qualifying
Fleet vehicles
Cooperative purchase$725,183two Karsan-Damera eJest Mini Buses
$326,426.67 per vehicle
Approved
CARRIED 5-0
staff report · staff report · agenda · minutes · packet
2025-06-17CalstartResolution No. 25-103 directing staff to negotiate budget revisions to the CMO Voucher Pilot Program grant to enable purchase of alternative qualifying electric
Fleet vehicles
Amendment$628,000
not to exceed
two electric shuttlesNo vote recordedstaff report · packet · packet · packet · city original
2025-03-04CalstartCMO Mobility Project Voucher Agreement with CALSTART, Inc. (San Clemente NEV Shuttles)
Fleet vehicles
Award$1,800,000
not to exceed
light or medium duty battery electric vehicles for the NEV Circulator …No vote recordedstaff report · staff report · staff report · staff report · packet
2024-06-18ACE Capital EngineeringCONTRACT AWARD - CITY HALL STANDBY GENERATOR ADDITION AND ELECTRICAL DISTRIBUTION SYSTEM UPGRADE AND APPROVING A 15% PROJECT CONTINGENCY
Microgrids and backup power
Award$551,994
not to exceed
350kW generator with 72-hour run sub-base fuel tankApproved
CARRIED 5-0; AYE: Duncan, Enmeier, Knoblock, Loeffler and Mayor Cabral; NOE:…
staff report · staff report · staff report · agenda · minutes
2022-08-16CaterpillarPurchase of a Standby Generator and Electrical Distribution System for the City Hall Building Located at 910 Calle Negocio
Microgrids and backup power
Cooperative purchase$350,000
not to exceed
350kW generator with 72-hour run sub-base fuel tankApproved
CARRIED 5-0
staff report · minutes · packet · packet · packet
2022-08-16Olinn Power SystemsCity of San Clemente City Hall generator purchase via Sourcewell contract 120617-CAT (Quotation 220300R1)
Microgrids and backup power
Cooperative purchase$312,7624 New Caterpillar Model C13 Diesel Standby Generator Sets, 350kWNo vote recordedpacket · packet · packet · packet · city original
2022-07-19O'Connell Engineering and ConstructionSupplemental appropriation and change order for Cyprus Shore emergency pump station bypass operation
Microgrids and backup power
Amendment$354,000
not to exceed
No vote recordedpacket · packet · packet · packet · packet