Cities Index.
Agenda

Hemet City Council
June 27, 2023

Document
Agenda
Meeting
June 27, 2023
Body
Hemet City Council
Pages
1,938
Original file
253.7 MB
Text extracted from the city's file for reading and search. Open the original on hemetca.civicweb.net. That file is the official record.

12.D

Page 184 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Plan Review Fee Permit Inspection Fee Note
Accessibility Ramp
1 Accessibility Ramp $184 $322
Cellular Antenna/Pole
2 Cellular Antenna/Pole $414 $368
3 Cellular Antenna/Pole Modification $184 $230
Christmas Tree Lot/Pumpkin Patch/Similar Event
4 Christmas Tree/Pumpkin Patch $184 $276
Construction Trailer
5 Construction Trailer $322
Demolition
6 Demolition - Patio Cover or Room $138
7 Demolition - Swimming Pool or Building $368
Residential Building - New Door, Window, or Skylight
8 Door, Window or Skylight (Addition of New) $184 $414
Drywall Repair
9 Drywall Repair
a) Up To 1,000 SF $230
b) Each Add'l 1,000 SF or Fraction Thereof $46
EVR System Upgrade
10 EVR System Upgrade $276 $552
Fence Building Permit
11 Fence - Residential $184 $230
12 Fence - Commercial $276 $368
Flag Pole
13 Flag Pole - Greater Than Or Equal To 25' $276 $414
14 Flag Pole - Less Than 25' $184 $276
Fireplace
15 Fireplace $184 $644
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
14

Page 23 of 136 ends

12.D

Page 185 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Plan Review Fee Permit Inspection Fee Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Food Truck or Carnival Event
16 Food Truck or Carnival Event $184 $368
Gas Line Building Permit - Max 500'
17 Gas Line Building Permit - Max 500' $138
Generator
18 Generator
a) 10kW or less $92 $138
b) Over 10kW $138 $184
Landscape
19 Landscape - Minor Or Modification Of Existing $46 $184 20 Landscape - Major - New Construction $184 $184
Meter Reset Residential
21 Meter Reset Residential $83
Mobilehome Plan Review and Permit Fees
22 Standard Plan Mobile Home Park: Building Plan Check and Permit Fees (Fee Per Title 25 of California Code of Regulations) See Title 25 CA Code of
Regulations
See Title 25 CA Code of
Regulations
Model Home Conversion to SFR
23 Model Home Conversion to SFR $0 $414
Parking Lot Re-Stripe
24 Parking Lot Re-Stripe
a) 1-2 Accessible Stalls $92 $138
b) Each Additional 2 Accessible Stalls $15 $15
Sales Office and Model Home Complex for Tract
25 Sales Office and Model Home Complex For Tract $322 $644 Septic System (New or Replace)
26 Septic System (New or Replace) $184 $368
Sewer Hook Up
27 Sewer Hook Up $598
Sewer Repair
28 Sewer Repair $322
15

Page 24 of 136 ends

12.D

Page 186 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Plan Review Fee Permit Inspection Fee Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Siding / Stucco Repair
29 Siding / Stucco Repair $368
Signs
30 Wall Sign $138 $138
31 Wall Sign Illuminated $230 $230
32 Monument Sign $184 $368
33 Monument Sign Illuminated $276 $414
34 Site Signage $368 $460
Spray Booth
35 Spray Booth $874 $460
Storage Racks
36 Storage Racks
a) Storage Racks - First 100 LF $184 $184
b) Storage Racks - Each Additional 100 LF $15
Swimming Pool - Commercial
37 Swimming Pool - Commercial $276 $1,380
Swimming Pool and Spa - Residential
38 Swimming Pool Residential $184 $828
39 Spa/Hot Tub Above Ground $460
Tent Sale
40 Tent Sale No Generator $184 $368
41 Tent Sale W/Generator $230 $460
Trash Enclosure
42 Trash Enclosure $276 $460
Utilities - Temporary Commercial Electrical and Gas
43 Utilities - Temporary Commercial Electrical and Gas $276 Utilities to Shed
44 Utilities To Shed Elec Plumb Gas Building Permit $92 $230 16

Page 25 of 136 ends

12.D

Page 187 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Plan Review Fee Permit Inspection Fee Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Wall Addition
45 Wall Addition - Interior Residential $276 $552
46 Wall Addition With Plumbing - Interior Residential $368 $736 47 Wall Addition - Interior Commercial $368 $782
48 Wall Addition With Plumbing - Interior Commercial $460 $1,288 17

Page 26 of 136 ends

12.D

Page 188 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note

STAND ALONE PERMIT FEES
Temporary Electrical Service
1 Temporary Electrical, Prior To Final $276
2 Temporary Electrical W/Gas Release $368
3 Temporary Power Pole $184
4 Span Poles $15

ALL OTHER PERMIT FEES
Receptacles, Switches, Fixtures, and Outlets
5 Each receptacle, switch, fixture, or outlet, lights $6 each Residential Appliances
6 For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter-mounted cooking tops; electric ranges; self-contained room, console or through-wall air conditions; space heater; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding 1 horsepower (HP)
$9 each
Non-Residential Appliances
7 For nonresidential appliances and self-contained factory-wired, nonresidential appliances not exceeding 1 horsepower (HP), kilowatt (kW) or kilovolt-ampere (kVA) in rating, including medical and dental devices; food, beverage and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment.
$9 each
Power Apparatus
8 Power Apparatus: Up To 1 HP, kW, Or kVA $9 each
9 Power Apparatus: 1- 10 HP, kW, Or kVA $31 each
10 Power Apparatus: 11 - 50 HP, kW, Or kVA $46 each
11 Power Apparatus: 50 - 100 HP, kW, Or kVA $92 each
12 Power Apparatus: > 100 HP, kW, Or kVA $138 each
Busways and Trolley
13 Busways-Plug In Type, Each 100 FT $9 each
14 Trolly, Each 100 FT $9 each
Electrical Permit Fees
Activity Description
18

Page 27 of 136 ends

12.D

Page 189 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note
Electrical Permit Fees
Activity Description
Signs, Outline Lighting and Marquees
15 For signs, outline lighting systems or marquees supplied from one branch circuit
$46 each
16 For additional branch circuits within the same sign, outline lighting system or marquee
$9 each
Services (Service Change)
17 Service: Up To 600 Volts And 200 Amperes $46 each
18 Services: Up To 600 Volts And 201-1,000 Amperes $92 each 19 Service: Over 600 Volts Or Over 1,000 Amperes $138 each Temporary Power Service
20 Temporary Pedestal $46 each
21 Temporary Distribution System $15 each
22 Temporary Lighting $15 each
Carnivals and Circuses
23 Generator $31 each
24 For electrical generators and electrically drive rides $31 each 25 For mechanically driven rides and walk-through attractions or displays having electric lighting
$9 each
26 For a system of area and booth lighting $9 each
Miscellaneous Apparatus, Conduits and Conductors
27 For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth.
$31 each
19

Page 28 of 136 ends

12.D

Page 190 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note

STAND ALONE PERMIT FEES
Commercial Hood & Duct
1 Commercial Hood & Duct $460 each

ALL OTHER PERMIT FEES
Furnaces
2 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance,
a) Up to and including 100,000 Btu/h (29.3 kW) $21 each b) Over 100,000 Btu/h (29.3 kW) $31 each
3 For the installation or relocation of each floor furnace, including vent. $21 each 4 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater.
$21 each
Appliance Vents
5 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit.
$9 each
Repairs or Additions
6 For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code. $21 each
Boilers, Compressor and Absorption Systems
7 For the installation or relocation of each boiler or compressor or absorption system:
a) Up to 3 HP; and including 100,000 Btu/h (29.3 kW) $21 each b) Over 3 HP; Over 100,000 Btu/h (29.3 kW) $37 each
Air Handlers
8 For each air-handling units to and including 10,000 cubic feet per minute (CFM), including ducts attached thereto.
$15 each
9 For each air-handling unit over 10,000 CFM $31 each
Evaporative Coolers
10 For each evaporative cooler other than portable type $15 each Mechanical Permit Fees
Activity Description
20

Page 29 of 136 ends

12.D

Page 191 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note
Mechanical Permit Fees
Activity Description
Ventilation and Exhaust
11 For each ventilation fan connected to a single duct $9 each 12 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit
$15 each
13 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood.
$15 each
Incinerators
14 For the installation or relocation of each domestic-type incinerator $31 each 15 For the installation or relocation of each commercial of industrialtype incinerator$92 each Miscellaneous
16 For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which other fee is listed in the table.
$15 each
21

Page 30 of 136 ends

12.D

Page 192 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note

STAND ALONE PERMIT FEES
Gas Connection / Release Prior To Final
1 Gas Connection Prior To Final $276
2 Gas Release Prior To Final W/Elec Release $368

ALL OTHER PERMIT FEES
Fixtures and Vents
3 For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection thereof) $15 each
4 For repair or alteration of drainage or vent piping $6 each Sewers, Disposal Systems and Interceptors
5 For each residential building sewer and each trailer park sewer $46 each 6 For each cesspool $46 each
7 For each private sewage disposal system, ex: septic tank $92 each 8 For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps
$46 each
9 Rainwater systems - per drain (inside building) $15 each Water Piping, Water Heaters and Water Softeners
10 For installation, alteration, or repair of water piping or water-treating equipment, or both
$6 each
11 For each water heater including vent $21 each
12 For each water softener $21 each
Gas Piping Systems
13 Gas Piping: 1-4 Outlets $6 each
14 Gas Piping: 5 Or More, Per Outlet $3 each
Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices 15 For each lawn sprinkler system on any one meter, including backflow protection devices thereof
$21 each
16 For each backflow-protection device 2 inches and smaller $21 each 17 For each backflow-protection device over 2 inches $46 each Plumbing Permit Fees
Activity Description
22

Page 31 of 136 ends

12.D

Page 193 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUILDING FEES
Fee Charge Basis Note
Plumbing Permit Fees
Activity Description
Miscellaneous
17 For each appliance or piece of equipment regulated by the Plumbing Code but not classed in other appliance categories, or for which no other fee is listed in this code.
$21 each
23

Page 32 of 136 ends

12.D

Page 194 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Fee Charge Basis Note
1 Administrative Fee $77

FIRE SPECIFIC ITEMS
2 Water Based Fire Protection Systems (1)
a) Fire Sprinkler Commercial/Multi Family/Other - New System i) Plan Review (up to 100 heads) $460 per installation
ii) Inspection (up to 100 heads) $552 per installation
b) Fire Sprinkler Commercial/Multi Family/Other - Alteration i) Plan Review (up to 25 heads) $230 per installation
ii) Inspection (up to 25 heads) $276 per installation
c) Fire Sprinkler, Per additional head - New or Alteration i) Plan Review $2 per head
ii) Inspection $2 per head
d) Fire Sprinkler Single Family/Duplex - New System
i) Plan Review $368 per installation
ii) Inspection $552 per installation
e) Fire Sprinkler Single Family/Duplex - Alteration of Existing System i) Plan Review $138 per installation
ii) Inspection $276 per installation
f) Standpipe
i) Plan Review (per standpipe system) $368 per system
ii) Inspection (per standpipe system) $736 per system
g) Fire Protection Underground System
i) Plan Review $552 each
ii) Inspection $736 each
h) Fire Pump
i) Plan Review $368 each
ii) Inspection $368 each
i) Per Additional Sprinkler Riser or Hydrant
i) Plan Review $184 each
ii) Inspection $368 each
3 Fire Alarm System (1):
a) Fire Alarm - New System
i) Plan Review (up to 25 devices) $322 per system
ii) Inspection (up to 25 devices) $460 per system
b) Fire Alarm - New System
i) Plan Review (> 25 devices) $552 per system
ii) Inspection (> 25 devices) $552 per system
c) Fire Alarm - Alteration
i) Plan Review (up to 5 devices) $184 per system
ii) Inspection (up to 5 devices) $276 per system
Activity Description
24

Page 33 of 136 ends

12.D

Page 195 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee Charge Basis Note
4 Alternative Automatic Extinguishing Systems (2):
a) Dry, Wet, CO2, Halon, UL 300, Clean Agent, Spray Booth, Other i) Plan Review $276 per system
ii) Inspection $414 per system
5 Other Fire Construction Reviews and Inspections (2):
a) LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, Industrial Oven, High-Piled Storage, and other Fire Construction Permit
i) Plan Review $460 per system
ii) Inspection $552 per system
b) Emergency Responder Radio Coverage
i) Plan Review & Coordination Deposit (3) $552 per system ii) Inspection & Coordination Deposit (3) $1,104 per system c) Public School Access & Water Supply Plan Check (hourly) - Minimum 1 hour review deposit required (3)
$184 per review
d) Alternative Materials & Methods of Construction (hourly) - Minimum 1 hour review deposit required (3)
$184 per review
6 Hazardous Activities Installation/Removal Permits (4):
a) Above Ground - Hazardous Materials Tank and/or Pipe
Installation or Removal (1 tank)
$736 per tank system
b) Under Ground - Hazardous Materials Tank Installation, New System (1 tank)
$736 per tank system
c) Under Ground - Hazardous Materials Tank Removal (1 tank) $736 per tank system d) Under Ground - Hazardous Materials Tank Pipe Installation or Removal (per additional tank)
$736 per tank
e) Above Ground Tank or Underground Tank installation or removal (per additional tank)
$368 per tank
7 Fire Code Verification:
a) Operational permit Plan Review/Application Code Review and Presubmittal Planning Related Reviews (hourly) - Minimum 1/2 hour review deposit, additional time billed at hourly rate (3) $92 per 1/2 hour
b) Operational permit inspection (hourly) - Minimum 2 hour review deposit, additional time billed at hourly rate (3)
$184 per hour
c) Special Events or Temporary Use Events (hourly) - Minimum 2 hour review deposit, additional time billed at hourly rate (3) $184 per hour
d) Inspection Outside of Normal Work Hours - Hourly Rate (7) $221 per hour 8 Annual Inspection:
a) Above Ground - Flammable / Combustible Liquid Tank and/or Pipe (>10,000 gallons)
$736 per tank system
b) Above Ground - Flammable / Combustible Liquid Tank and/or Pipe (<10,000 gallons)
$368 per tank system
c) Underground Hazardous Materials Tank Inspection $690 per tank system d) CalARP Facility $552 per site
9 California Fire Code Verification $184 per hour
25

Page 34 of 136 ends

12.D

Page 196 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee Charge Basis Note

OTHER MISCELLANEOUS FEES
10 High Rise Building $230 per floor
11 Day Care Inspection
a) Residential (Child / Elderly / Community) Less Than 26 (per hour) $184 b) Residential (Child / Elderly / Community) 26 & Over (per hour) $184 12 Detention Facilitites $368
13 Educational Facilities
a) 1 - 250 Students $184
b) 251 - 500 Students $368
c) > 500 Students $736
14 Fire Clearance Inspection (5):
a) Less than 500 SqFt $138 per certificate
b) 501 - 1,000 SqFt $184 per certificate
c) 1,001 - 3,000 SqFt $276 per certificate
d) Greater than 3,000 SqFt $506 per certificate
15 Research $92 per half-hour
16 Re-Inspection Fee $184 per hour
17 Service Required in Excess of Standard. Applies to all fees listed in schedule. See footnote (6)
$184 per hour
18 Supplemental Plan Check Fee (per hour for more than two reviews) $184 per hour 19 Certificate of Occupancy
a) Temporary Certificate of Occupancy $138 each
b) Certificate of Occupancy $138 each
20 Change of Use Inspection
a) Change of Use - 4,999 SF or Less $138 each
b) Change of Use - 5,000 - 9,999 SF $276 each
c) Change of Use 10,000 - 19,999 SF $552 each
d) Change of Use 20,000 SF or greater $1,104 each
21 New Construction Plan Check (8):
a) A - Assembly $460 each
b) B, I, M - Business, Institutional, Mercantile $368 each c) F, S, H - Factory, Storage, Hazardous $460 each
d) All Tenant Improvements $276 each
e) U - Utility Structures and Buildings $184 each
22 Technology Fee (percent of permit fee) 5% % of fee
23 Work Without a Permit 2x applicable fee
26

Page 35 of 136 ends

12.D

Page 197 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee Charge Basis Note
24 Special Request for Fire Department Personnel Services a) Fire Prevention Personnel and Contract Support $184 per person; per hr. b) Fire Operations Staff overtime rate by rank per person; per hr. 25 Fees for Services Not Listed in this Fee Schedule $184 per person; per hr. 26 Assembly A-1, A-4, A-5 Occupancy Fire Permit $405
27 Assembly A-2, A-3, Shell, VTI, TI Occupancy Fire Permit $214 28 Business Fire Permit $184 per each 10,000 sq ft
29 Commercial Carport Plan Fire Permit $214
30 Carport Commercial Fire Plan Review $214
31 Commercial Interior Wall Addition Fire Permit $92
32 F-2 Occupancy IIA, IIIA, VA, IV, IIB, IIIB, VB Fire Permit $414 33 F-2 Occupancy IA, IB $214
34 F Shell Occupancy IIA, IIB, IIIA, IIIB, VA, VB Fire Permit $230 35 Generator Fire Permit $92
36 Generator Fire Plan Review $92
37 Hazardous Occupancy Fire Permit $1,012
38 Institutional Occupancy $368
39 Multi-Family 3+ Units Fire Permit
a) Up to 10 buildings $214
b) Each building over 10 $20
40 Multi-Family 3+ Units Fire Plan Review $318
41 Photovoltaic Commercial Fire Plan Review $111
42 Photovoltaic Fire Permit $111
43 Special Event Fire Permit $59
44 Tent Commercial Sale Generator Fire Permit $111
45 Tent Commercial Sale No Generator Fire Permit $92
46 Fire Tenant Improvement Plan Review Fee $214
27

Page 36 of 136 ends

12.D

Page 198 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES
Activity Description Fee Charge Basis Note
47 False Alarm Penalties (within 12 months)
a) Permitted
i) First Response No Charge
ii) Second Response $100
iii) Third Response $125
iv) Fourth Response $150
v) Fifth Response $175
vi) Each Additional Response $200
b) Non-Permitted
i) First Response Warning
ii) Second Response $200
iii) Third Response $250
iv) Fourth Response $300
v) Fifth Response $350
vi) Each Additional Response $400

OPERATIONAL PERMITS
48 Operational Permits
a) Initial Permit $184 see Operational Permits
Worksheet
b) Each Additional Permit $46 see Operational Permits
Worksheet
(1) Fee includes up to two plan checks or three inspections. Additional costs to be recovered at staff hourly rate. (2) Fee includes up to two plan checks or two inspections. Additional costs to be recovered at staff hourly rate. (3) Actual costs - may also be charged by actual costs using the fully burdened hourly rates plus any outside consultant costs if applicable.

Review time exceeding initial hours assumed for establishing deposit is billed at hourly rate. (4) Fee includes plan check and up to two inspections. Additional costs to be recovered at staff hourly rate. (5) Fee includes research and up to two inspections. Additional costs to be recovered at staff hourly rate. (6) Each fee listed in this schedule is based on the estimated number of hours required to perform a standard service request.

The standard number of hours estimated can be calculated by dividing the fee amount by $184, the Division's fully-burdened hourly rate.

For example, a fee amount of $368 assumes roughly 2 hours will be required to perform a standard request for the fee related service.

Review and inspection efforts that exceed the standard number of hours used to calculate the fee by more than one hour will be billed hourly for any time spent in excess of the standard hours built into the fee. (7) Inspection outside normal work hours will require hourly fees in addition to other required fees. (8) Planning submittals for fire review and related correspondence, meetings, etc. may be charged for at hourly rate during the construction plan review.
28

Page 37 of 136 ends

12.D

Page 199 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES

OPERATIONAL PERMITS
CFC 105.6: Required Operational Permits
The fire code official is authorized to issue operational permits for the operations set forth in 105.5.2 through 105.5.52 Code
Additive Manufacturing 105.5.1
Aerosol Products, Aerosol Cooking Spray Products and Plastic Aerosol 3 Products in excess of 500lbs 105.5.2 Amusement Buildings 105.5.3
Aviation Facilities 105.5.4
Carnivals and Fairs 105.5.5
Cellulose Nitrate Film 105.5.6
Combustibles Dust-Producing Operations 105.5.7
Combustible Fibers 105.5.8
Compressed Gases 105.5.9
Covered and Open Mall Buildings 105.5.10
Cryogenic Fluids 105.5.11
Cutting and Welding 105.5.12
Dry Cleaning 105.5.13
Energy Storage Systems 105.5.14
Exhibits and Trade Shows 105.5.15
Explosives 105.5.16
Fire Hydrants and Valves 105.5.17
Flammable and Combustibles 105.5.18
Floor Finishing 105.5.19
Fruit and Crop Ripening 105.5.20
Fumigation and Insecticidal Fogging 105.5.21
Hazardous Materials 105.5.22
HPM Facilities 105.5.23
High-Piled Storage 105.5.24
Hot Works Operations 105.5.25
Industrial Ovens 105.5.26
Lumber Yards and Woodworking Plants 105.5.27
Liquid-or Gas-Fueled Vehicles or Equipment in Assembly Buildings 105.5.28 LP-Gas 105.5.29
Magnesium 105.5.30
Miscellaneous Combustible Storage 105.5.31
Mobile Fueling of Hydrogen-Fueled Vehicles 105.5.32
Motor Fuel-Dispensing Facilities 105.5.33
Open Burning 105.5.34
Open Flames and Torches 105.5.35
Open Flames and candles 105.5.36
Organic Coatings 105.5.37
Outdoor assembly Event 105.5.38
Places of Assembly 105.5.39
Plant Extraction Systems 105.5.40
Description
29

Page 38 of 136 ends

12.D

Page 200 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FIRE PREVENTION FEES

OPERATIONAL PERMITS
CFC 105.6: Required Operational Permits
The fire code official is authorized to issue operational permits for the operations set forth in 105.5.2 through 105.5.52 Description Code
Private Fire Hydrants 105.5.41
Pyrotechnic Special Effects Material 105.5.42
Pyroxylin Plastics 105.5.43
Refrigeration Equipment 105.5.44
Repair Garages and Motor Fuel-Dispensing Facilities 105.5.45 Rooftop Heliports 105.5.46
Spraying or Dipping 105.5.47
Storage of Scrap Tires and Tire Byproducts 105.5.48
Temporary Membrane Structures and Tents 105.5.49
Tire-Rebuilding Plants 105.5.50
Waste Handling 105.5.51
Wood Products 105.5.52
30

Page 39 of 136 ends

12.D

Page 201 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PLANNING FEES
Fee
Initial
Deposit Charge Basis Note
Agreement
1 Density bonus Agreement $3,690 [a]
2 Development Agreement
a) Agreement $20,000 Deposit [a]
b) Agreement Amendment $10,000 Deposit [a]
Application
3 SDR Modification - Minor (CDDR) $2,621
4 Administrative Adjustment (Zoning standards) $996
5 Administrative Use
a) Permit (CDDR) $4,539
b) Permit Modification $2,261
6 Adult Business Permit $8,960
7 Alcoholic Beverage Control Review - Finding of Public Convenience or Necessity (CDDR)
$2,271
8 Annexation $10,000 Deposit [b]
9 Appeals
a) Community Development Director Decision $1,594
b) Planning Commission Decision $1,594
10 Certificate of Compliance (Not Including Lot Line Adjustment) $912 11 Conditional Use Permit (CUP)
a) Major $9,614
b) Minor $6,854
c) Modification $6,184
12 Conditions of Approval - Amendment $3,724
13 Conversion from Senior Housing Permit- (PC) $8,629
14 Conversion to Condominiums $8,389
15 Determination of Use (CDDR) $515
Activity Description
31

Page 40 of 136 ends

12.D

Page 202 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PLANNING FEES
Fee
Initial
Deposit
Activity Description Charge Basis Note
16 Downtown Project Site Development Review
a) Major - PC $3,498
b) Minor - CDDR $1,395
17 Extension of Time - Community Development Director Review $2,421 18 Extension of Time - Planning Commission Review $3,816 19 General Plan Amendment (GPA)
a) Text/Policy Change - Major $10,000 Deposit [c]
b) Text/Policy Change - Minor $4,800
c) Land Use or Circulation Map Change $8,000 Deposit [d] 20 Habitat Acquisition and Negotiation Strategy (HANS) Application Review
$1,992
21 Lot Line Adjustment $1,946
22 Mobile Home Park Conversion $10,169
23 Model Home Complex/Sales Office: Model Home Plan Complex $2,732 24 Parcel Map Waiver $3,889
25 Planned Community Development (PCD) $15,000 Deposit
26 Planned Community Development (PCD) Amendment $5,000 Deposit 27 Planned Unit Development (PUD) $10,000 Deposit
28 Planned Unit Development (PUD) Amendment $5,000 Deposit 29 Preliminary Application Review - conceptual $1,618
30 SDR Modification - Major (PC)
a) Major (PC) $3,571
b) Minor $1,586
31 Sign Program
a) Minor Amendment (CDDR) $843
b) Major Amendment (PC) $1,686
32

Page 41 of 136 ends

12.D

Page 203 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PLANNING FEES
Fee
Initial
Deposit
Activity Description Charge Basis Note
32 Site Development Review (SDR)
a) Minor - CDDR $7,564
b) Major- Commercial/industrial (PC) $11,143 Base Fee Plus $15.00 per acre
c) Auto Center Review $4,705
33 Site Development Review Major- residential (PC) $11,143 Base Fee Plus $10.00 per unit
34 Small Group Home Permit $1,430
35 Specific Plan $20,000 Deposit [c]
36 Specific Plan Amendment $10,000 Deposit [c]
37 Sphere Of Influence Amendment $15,000 Deposit [c]
38 Subdivision
a) Reversion to acreage/lot merger $4,735
b) Amended Final Map $5,023
39 Substantial Conformance Determination (Subdivision, SDR,CUP) (CDDR)
$5,271
40 Tentative Map Revision/Resubmittal $6,850
41 Tentative Parcel Map
a) Commercial/Industrial $8,214
b) Residential $6,980
42 Tentative Tract Map
a) Condominium or Conveyance $10,076 Base Fee + $15/acre b) Residential $12,513 Base Fee + $15/lot
43 Variance (Major) $4,383
44 Vesting Tentative Tract Map Actual Cost @ FBHR [c]
45 Zone Change - map designation $8,826 Plus GIS mapping fee [e] 46 Zoning Verification Letter $299
47 Zoning Ordinance Amendment $3,000 Deposit [c]
33

Page 42 of 136 ends

12.D

Page 204 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PLANNING FEES
Fee
Initial
Deposit
Activity Description Charge Basis Note
Direct Cost
48 Public Hearing Notice
a) Ad Publication $345
b) Mail Out $399 Plus postage costs
Permit
49 Home Occupation Permit $100
50 Homemade Food Operator
a) Permit $232
b) Annual Renewal $100
51 Permanent Sign Permit $199
52 Temporary Sign/Banner Permit $100
53 Temporary Use Permit
a) Permit $399 Plus cost for
inspections, if needed
b) Permit for Non-Profit Council
Determination for no
cost recovery for
processing
Professional Services
54 City Attorney Review/Meeting Time FBHR Deposit
55 Planning Division Hourly Rate for other services Actual Cost Deposit [c] 56 Planning Research Fee Actual Cost Deposit [c]
Review
57 Airport Compatibility Study Review $1,046
58 Airport Influence Area Review $398
Technical Review
59 GIS - Mapping Fee $215 Base Fee + $10/acre
60 Mitigation Monitoring $2,000 Deposit [c]
61 Technical Study review Deposit for FBHR - I
hour minimum
34

Page 43 of 136 ends

12.D

Page 205 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PLANNING FEES
Fee
Initial
Deposit
Activity Description Charge Basis Note
62 CEQA
a) Categorical Exemption $299
b) Environmental Impact Report $20,000 Deposit [f]
c) Initial Study w/Mitigated Negative Declaration $5,000 Deposit [f] d) Initial Study w/Negative Declaration $2,000 Deposit [f] 63 Credit Card Transaction Processing Fee 3% % of fees paid by credit card
64 Building Plan Check $100
65 Planning Final Inspection $398
66 Sidewalk Vendor Permit $398
67 Food Truck Permit $398
68 Commercial Cannabis Permit $9,772
69 Special Events Permit $199
70 Fees for Services Not Listed in this Fee Schedule
a) In-house Planning personnel $199 per person; per hr. b) Contract Service Support Actual Cost passthrough of actual cost
71 Metal Storage Container $446
[a] Plus city attorney costs at fully burdened hourly rate. [b] Full cost deposit for staff time + deposit for city attorney time (minimum $10,000.00 + gis mapping fee). [c] Actual cost at fully burdened hourly rate.
[d] Deposit for full cost plus gis mapping fee.
[e] Plus GIS mapping fee.
[f] Full cost deposit + staff time deposit at 20% of contract amount + deposit for city attorney time. 35

Page 44 of 136 ends

12.D

Page 206 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Fee Charge Basis Note
Land Subdivision
1 Parcel Map:
a) Final Parcel Map (up to 3 reviews)
i) Initial Sheet $4,300
ii) Each Additional Sheet $1,290
b) Final Parcel Map - Amendment
i) Initial Sheet $3,117
ii) Each Additional Sheet $860
c) Substantial Conformance Review
i) Initial Sheet $2,580
ii) Each Additional Sheet $860
2 Tract Map: (up to 3 reviews)
a) Final Tract Map
i) Initial Sheet $5,590
ii) Each Additional Sheet $1,720
b) Final Tract Map - Amendment
i) Initial Sheet $3,332
ii) Each Additional Sheet $967
c) Substantial Conformance Review
i) Initial Sheet $3,010
ii) Each Additional Sheet $1,290
3 Reversion to Acreage: (up to 3 reviews)
a) Initial Sheet $4,300
b) Each Additional Sheet $860
4 Lot Line Adjustment/Parcel Merger (up to 3 reviews)
a) Lot Line Adjustment $2,580
b) Parcel Merger $2,580
5 Street Dedication/Vacation
a) Summary $6,020
b) Detailed $7,954
6 Land Survey (up to 3 reviews)
a) Record of Survey $4,300
b) Certificate of Correction $1,720
Activity Description
36

Page 45 of 136 ends

12.D

Page 207 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Mass Grading / Stockpile
i) Initial Sheet $645
ii) Each Additional Sheet $215
iii) Revisions - Initial Sheet $107
iv) Revisions - Each Additional Sheet $107
b) Rough Grading
i) Initial Sheet $1,774
ii) Each Additional Sheet $967
iii) Revisions - Initial Sheet $1,505
iv) Revisions - Each Additional Sheet $1,075
c) Precise Grading - Commercial
i) Initial Sheet $1,935
ii) Each Additional Sheet $1,505
iii) Revisions - Initial Sheet $1,290
iv) Revisions - Each Additional Sheet $1,075
d) Precise Grading - Tract Homes
i) Initial Sheet $1,397
ii) Each Additional Sheet $430
iii) Revisions - Initial Sheet $752
iv) Revisions - Each Additional Sheet $269
e) Precise Grading
i) Precise Grading - Infill Home $1,075
ii) Precise Grading - Custom Home $1,290
f) PM 10 (Fugitive Dust Control)
i) PM 10 Packet $537
ii) PM 10 Full Size Plan $860
iii) Revisions - Packet $430
iv) Revisions - Full Size Plan $322
g) Street Improvements
i) Initial Sheet $1,935
ii) Each Additional Sheet $860
iii) Revisions - Initial Sheet $1,290
iv) Revisions - Each Additional Sheet $645
h) Storm Drain
i) Initial Sheet $1,935
ii) Each Additional Sheet $860
iii) Revisions - Initial Sheet $1,290
iv) Revisions - Each Additional Sheet $645
37

Page 46 of 136 ends

12.D

Page 208 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
i) Signing and Striping
i) Initial Sheet $1,720
ii) Each Additional Sheet $860
iii) Revisions - Initial Sheet $1,505
iv) Revisions - Each Additional Sheet $860
j) Traffic Signal
i) Initial Sheet $2,580
ii) Each Additional Sheet $1,290
iii) Revisions - Initial Sheet $1,075
iv) Revisions - Each Additional Sheet $645
k) Sidewalk (when submitted separately from grading plan) i) Initial Sheet $645
ii) Each Additional Sheet $322
iii) Revisions - Initial Sheet $860
iv) Revisions - Each Additional Sheet $430
l) Traffic Control Plan $645
m) Record Drawings Review
i) Initial Sheet $1,075
ii) Each Additional Sheet $215
n) Hydrology Report $2,580
i) Revisions $1,075
o) Traffic Study $2,580
p) Traffic Letter $430
q) Water Quality Mgmt. Plan Report (WQMP) $2,580
i) Revisions $1,075
r) Stormwater Pollution Prevention Plan (SWPPP) $645
i) Revisions $215
s) Sewer and Water - Onsite or Offsite
i) Initial Sheet $1,075
ii) Each Additional Sheet $430
iii) Revisions - Initial Sheet $107
iv) Revisions - Each Additional Sheet $107
8 Plan Review (per review>3 Reviews) $215 per hour
9 Expedited Plan Review Fee 1.5x fee [a]
10 Offsite Landscape Review Fee
a) Initial Sheet $1,935
b) Each Additional Sheet $860
c) Revisions - Initial Sheet $107
d) Revisions - Each Additional Sheet $107
38

Page 47 of 136 ends

12.D

Page 209 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
11 Street Light Review Fee
a) Initial Sheet $1,720
b) Each Additional Sheet $860
c) Revisions - Initial Sheet $107
d) Revisions - Each Additional Sheet $107
12 Building Submittal Review Fee $215 per hour
13 Easements
a) Dedication/Quitclaim $3,010
b) Vacation $3,870
14 Centerline Ties Review $1,720
15 Import/Export Fee $0.35 per cubic yard
16 Special Financing District Formation (LMD, CFD, Etc.) $30,000 Deposit [b] 17 Permit Inspection (per permit)
a) Mass Grading / Stockpile
i) Per 1,000 CY $159
b) Rough Grading
i) First 3 Acres $796
ii) Each Additional Acre $119
c) Precise Grading
i) Single Family Infill Lot $478
ii) Single Family Custom Home Lot $637
iii) Tract Home (per lot) $318
iv) All Others
a) Without Rough Grading
i) First 3 Acres $796
ii) Each Additional Acre $159
b) Subsequent to Rough Grading
i) First 3 Acres $478
ii) Each Additional Acre $80
d) Sewer and Water - Private On Site $239
e) All Other (Including Public Improvements and Private Street Improvements) i) Engineer's Estimate - for first $250,000 a) Minimum Fee $1,274
b) Percent of Engineer's Estimate 6%
ii) Engineer's Estimate - for next $250,000
a) Base Fee $13,058
b) plus, Percent of Engineer's Estimate > $250,000 3%
iii) Engineer's Estimate - for amount exceeding $500,000 a) Base Fee $21,338
b) plus, Percent of Engineer's Estimate > $500,000 2%
39

Page 48 of 136 ends

12.D

Page 210 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
f) PM10 (per year)
i) Single Family Infill Lot <10,000 Sq Ft $637 [c]
ii) > 10,000 Sq Ft - < 10 Acres $1,911 [c] , [d]
iii) 10 - 50 Acres $2,866 [c] , [d]
iv) 51 - 200 Acres $3,822 [c] , [d]
v) > 200 Acres $4,777 [c] , [d]
18 Encroachment Permits
a) Minor Encroachment Work Inspection $398
b) Street Improvements - Off-Site
i) Up to 500 LF $628 [e]
ii) 500 - 1,000 LF $943 [e] , [f]
iii) Each Additional 1,000 LF $628 [e] , [f]
c) Storm Drain Line
i) Up to 500 LF $1,257
ii) 500 - 1,000 LF $2,199 [f]
iii) Each Additional 1,000 LF $943 [f]
d) Storm Drain Inlet/Outlet Structures
i) Up to 5 $628
ii) Each Additional $157
e) Off-site Signing and Striping
i) Up to 500 LF $628 [g]
ii) 500 - 1,000 LF $1,257 [f] , [g]
iii) Each Additional 1,000 LF $236 [f] , [g]
f) Traffic Signal $2,513
g) Bond Reduction Request $1,807
h) Final Inspection/Acceptance
i) Single Family Lot <10,000 Sq Ft $157 [h]
ii) > 10,000 Sq Ft - < 2 Acres $471 [i]
ii) > 2 Acres - < 10 Acres $628 [i]
iii) > 10 - < 50 Acres $943 [i]
iv) > 50 - 200 Acres $1,257 [i]
v) > 200 Acres $1,571 [i]
i) Traffic Control
i) Up to Two Consecutive Days $196 [j]
ii) Three - Five Consecutive Days $471
iii) Each Additional Consecutive Day (Up to 10 Days) $118 iv) 11+ Days (Up to 60 Calendar Days Max) $1,571
j) Cut/Bore/Vault/Pot Hole $314
k) Driveway
i) Residential $196
ii) Commercial $628
40

Page 49 of 136 ends

12.D

Page 211 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
l) Excavation / Trenching
i) First 100 LF $471
ii) Each Additional 100 LF $79
m) Sidewalk
i) Up to 20 Lineal Feet $118
ii) 20 - 100 Lineal Feet $157
iii) Each Additional 100 Lineal Feet $157
n) Night Work (per night) $1,274
o) Excess Inspection / Missed Inspection / Re-Inspection / Re-Call Compliance Inspections
$159 per hour
p) Stop Work Notice Release $478
19 Research/Administrative
a) Subdivision Improvement Agreement (SIA) $1,885
b) SIA - Time Extension $1,100
c) Assignment & Assumptions Agreement $2,042
d) Flood Plain
i) Research/FEMA App $471
ii) Community Acknowledgement Form $236
e) Bid Protest Review $1,257
f) Misc Research (per request, per hour) $157 [k]
g) Misc Covenant Review & Approval $393
h) CC&R Review (per request) $2,513
i) Streetlight Application Review and Covenant $393
20 Reactivation of Permit
a) Reactivation of an Expired Minor Permit $157 [l]
b) Reactivation of an Expired Major Permit $314 [l]
21 Technology Enhancement Fee (percent of permit fee) 5% 22 Transportation Permits
a) Annual $90
b) Single Event $16
23 Plan Review - Water and Sewer
a) Residential Tract - per 500 LF Water $107
b) Residential Tract - per 500 LF Sewer $107
24 Fees for Services Not Listed in this Fee Schedule $215 per person; per hr. 41

Page 50 of 136 ends

12.D

Page 212 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - ENGINEERING FEES
Activity Description Fee Charge Basis Note
[a] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [b] Deposit amount may be adjusted based on consultant estimate. [c] For PM10 annual permit.
[d] Fee generally assumes one inspection per month. Additional inspections billed using re-inspection fee. [e] Includes, curb, gutter, and sidewalk. Excludes driveways. [f] Rounded up to nearest thousand feet.
[g] Footage based on centerline street length.
[h] Includes tract single family homes, does not include tract final. [i] Includes tract finals.
[j] Permanent patching of pavement at same location will count as a subsequesnt consecutive day. [k] Estimate provided up front.
[l] Assumes no changes to original permit.
42

Page 51 of 136 ends

12.D

Page 213 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PUBLIC WORKS - PUBLIC WATER UTILITY SERVICES FEES Fee Note
1 Utility account set up $42
2 Shut Off Notice
a) First Unit $50
b) Each Additional Unit $11
3 Delinquent Shut-Off/Reconnect
a) Low Income
i) During normal work hours $54
ii) After normal work hours $136
b) All Others
i) During normal hours (Before 3pm) $82
ii) After normal hours (After 3pm) $250
4 Non-Sufficient Funds/Returned Check Fee
a) First $25 [a]
b) Each Additional $35 [a]
5 Temporary Construction Water Meter
a) Temporary Construction Water Meter $141, plus cost of water; $1,200 deposit for meter and water
b) Temporary Construction Water Meter and Backflow device with test $228, plus cost of water; $2,200 deposit for meter and water
c) Temporary Construction Meter Relocation $86
d) Temporary Construction Meter and backflow Device with Test Relocation $241 6 Temporary Service $61
7 Water Turn-On/Turn-Off by Customer Request - Out of Schedule a) During normal work hours (Before 3pm) $54
b) After normal work hours (After 3pm) $136
8 Illegal Reconnect
a) Broken Lock $109
b) Removal of Meter w/ plug $109
c) Removal of Jumper $109
9 Meter Purchase
a) 5/8" x 3/4" Actual Cost
b) 1" Actual Cost
c) 2" Actual Cost
d) Larger than 2" Actual Cost
Activity Description
43

Page 52 of 136 ends

12.D

Page 214 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PUBLIC WORKS - PUBLIC WATER UTILITY SERVICES FEES Activity Description Fee Note
10 Backflow Testing Program - Annual Fees
a) Backflow device inspection (new/replaced) $138
b) Backflow Inspection and Test $224
c) Backflow non-compliance test $293
d) Backflow non-compliance shut-off $276
11 Fire Flow Testing for New Fire Services $172
12 Meter Testing
a) 5/8" to 1" $115
b) 1.5" or 2" $150
c) Larger than 2" $150
13 Collection Agency Processing $50
14 Dye Test $184
15 Utility Connections (Water & Sewer)
a) Plan Review $391
b) Inspection $376
16 Fees for Services Not Listed in this Fee Schedule
a) Maint Worker II $113 [b]
b) Water/Fin. - Cust Serv Rep $125 [b]
c) Water Quality/ conservat. $141 [b]
d) Backflow Cross-Connection $138 [b]
e) Water Customer Service Field $118 [b]
[a] California Civil Code Section 1719.
[b] Per person, per hour.
44

Page 53 of 136 ends

12.D

Page 215 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - PUBLIC WORKS - MAINTENANCE FEES
Fee Note
1 Banner Installation and Removal
a) Banner (Across Street) $258 [a]
b) Pennants/Flag Banners (per pole) $218 [b]
2 Graffiti Removal
a) Up to 250 SF $201
b) Each Additional 100 SF $23
3 Response and cleanup of sewer spills, spills affecting the storm drains, nuisance abatement, etc.

Actual Cost [c]
4 NPDES Ongoing Inspection Fee
a) Industrial
i) High Priority $287 [d]
ii) Medium Priority $287 [d]
b) Commercial
i) High Priority $236 [d]
ii) Medium Priority $236 [d]
iii) Low Priority $201 [d]
c) Restaurant
i) High Priority $236 [d]
ii) Medium Priority $236 [d]
iii) Low Priority $201 [d]
e) Re-inspections $201 [d]
f) Post Construction BMPs $322 [d]
5 Self Haul Permit $298
6 NPDES Construction Activities Inspection $110
7 Equipment Supplied by City See Caltrans rate schedule [e] 8 Fees for Services Not Listed in this Fee Schedule $131 [f] [a] Banner to be provided to City by fee payer.
[b] Fee amount per pole includes cost of materials.
[c] Actual cost including materials, equipment, and labor time billed at fully-burdened hourly rates. [d] Per inspection.
[e] fema.gov/assistance/public/schedule-equipment-rates [f] Billed at fully-burdened hourly rate of staff providing services.

Activity Description
45

Page 54 of 136 ends

12.D

Page 216 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - POLICE FEES
Fee Charge Basis Note
1 DUI Accident Investigation direct costs +
staff FBHR
fbhr + testing costs
2 Crime Scene Photo Reproduction (digital only, no paper reproduction)
$37 [a]
3 Concealed Weapons Investigation $52 plus vendor costs [a] 4 False 911 calls $100
5 Civil Subpoenas Maximum Allowed by Law per hour; per person; per mile
6 Massage Establishment Inspection $200
7 Firearms Dealers $40
8 Photographs (Digital Media) $29 [a]
9 Citation Sign-Off (Non Hemet PD citation) $26
10 Duplicate Citations $6
11 Massage Technician/Establishment Hearing $365
12 Gun Storage Admin Fee $50
13 Storage of Vendor Equipment or Products $50
14 Police Report - Non-Collision Report $10 [b]
15 Police Report - Call for Service $5 [a]
16 Police Report - Traffic Collision w / injury $32 [a] 17 Police Report - Traffic Collision without injury $15 [a] 18 Agency Live-scan fee $35 [a]
19 Subpoena Fee
a) Clerical Retrieval $24 per hour [c]
b) Copies up to 8.5 x 14 $0.10 per page [c]
20 Bicycle License $8 for 3 years [a]
21 Repossession Fee $15 [a]
22 VIN Verification $40 [a]
23 Vehicle Impound Fee $200 [d]
24 Statistical Report (per location) $10 [a]
Activity Description
46

Page 55 of 136 ends

12.D

Page 217 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - POLICE FEES
Activity Description Fee Charge Basis Note
25 Clearance Letter $35 [a]
26 Witness Fee (Civil) $275 per person; per day [e]
27 HPD Inspection/Admin Processing - Ice Cream / Food Truck Vendors $80 per cart / vehicle
[f]
28 2nd Hand Dealer / Pawn Broker - HPD Clerical/Admin DOJ License Processing Recovery
$60 per license [f]
29 Fees for Services Not Listed in this Fee Schedule Varies per person; per hour
[g]
[a] Per Resolution 3891.
[b] Per California Governement Code 6253(b).
[c] Per California Evidence Code Section 1563.
[d] Per California Vehicle Code 22850.5.
[e] Per Government Code 68097.2
[f] Does not include business license fees.
[g] Billed at fully-burdened hourly rate of staff providing services. 47

Page 56 of 136 ends

12.D

Page 218 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - CODE ENFORCEMENT FEES
Fee Charge Basis Note
1 Foreclosure
a) Registration $420
b) Foreclosure Re-registration $161
2 Garage Sale Permit $20
3 Abandoned Vehicle Removal $138
4 Code Enforcement Inspection (per hour) $156 per hour
Activity Description
48

Page 57 of 136 ends

12.D

Page 219 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - FINANCE
Fee Charge Basis Note
1 Non-Sufficient Funds Processing
a) First $25 Each [a]
b) Each Additional $35 Each [a]
2 Copy or Replacement of Business License $5 Each
[a] California Civil Code Section 1719.

Activity Description
49

Page 58 of 136 ends

12.D

Page 220 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - CITY CLERK
Fee Charge Basis Note
1 Copying and Printing Service
a) Documents 8.5" x 14" or less (per single-sided page) $0.10 per page b) Oversize Documents Actual Cost
2 Digital Media Fee $10 [a]
3 Research Service $24 per hour
4 Minute/Agenda Mailing Service
a) With Stamped Envelopes Provided by Requestor $88
b) Without Stamped Envelope Provided by Requestor $112
5 Subpoena Document Preparation and Witness Fees Maximum Allowed by Law
per hour, per mile, per person
6 Fee for Services Not Otherwise Specified $101 per hour [a] Applies when digital media device provided by City.

Activity Description
50

Page 59 of 136 ends

12.D

Page 221 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - LIBRARY
Fee Charge Basis Note
1 Late fees for all materials $0.50 Per day
2 Maximum late fees for all material $10 Per item
3 Replacement fees $10 processing fee
plus cost of materials
Per item
4 Copies and printing
a) Black and white $0.15 Per page
b) Color $0.35 Per page
5 Public fax - National
a) First page $1.75 Per page
b) Each Add'l page $1.00 Per page
6 Public fax - International
a) First page $3.95 Per page
b) Each Add'l page $3.45 Per page
7 Collection agency fees $15 Per Account
8 Replacement Card $3
9 Visitors Card $5
10 Buying Computer Time (additional time) $8 Per hour
11 Study Room $5 Per Hour
12 Passport processing $35 Set by Dept of State
Activity Description
51

Page 60 of 136 ends

12.D

Page 222 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - SCHEDULE OF FACILITY RENTAL RATES AND CHARGES Reservation Fee Facility Setup /
Teardown Fee
Facility
Attendant Fee
Cleaning /
Damage Deposit Note
1 Conference Room Rental $55 for up to 3 hours;
$25 each additional hour
No Charge No Charge n/a [a]
2 Hall Rental $525 for up to 3 hours;
$125 each additional hour
$150 per rental $38 per hour $500 per rental [a] [b]
3 Kitchen Use Fee
(in addition to base rental fee)
$25 per hour
4 Dance Floor Use Fee
(in addition to base rental fee)
$300 flat fee per use
5 Patio Use Fee
(in addition to base rental fee)
$75 per hour
[a] The City reserves the right to collect additional amounts to cover all costs of cleaning, repair, and damage. [b] Rental times include your setup and tear down.

Activity Description
52

Page 61 of 136 ends

12.D

Page 223 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUSINESS LICENSE FEES
Fee Charge Basis Code
1 Adult Businesses refer to Planning first Sec. 18-351
2 Advertising billboards $154.00 per board face Sec. 18-61 3 Amusement, recreation, entertainment Sec. 18-61
(a) any coin operated game $44.00
i) Plus fee per coin operated game $5.00
(b) spectator events $19.00
i) Plus fee per concession $5.00
4 Billiards $44.00 Sec. 18-61
a) Plus Fee per table $5.00
5 Bingo $44.00 Sec. 18-121
6 Booth Rental $29.00
7 Bowling Alley $104.00 plus employees Sec. 18-61
a) Plus fee per alley in excess of 3 alleys $12.00
8 Carnival / Circus / Fair Sec. 18-61
(a) 1st Day $204.00
(b) Each Succeeding Day $100.00
9 Child Care Sec. 18-59
(a) 6 or less not required
(b) 7 or more $44.00
10 Contractor Sec. 18-60
(a) General - A or B
(i) per year, or $84.00
(ii) 1 Job Only $44.00
(b) Sub - C
(i) per year, or $64.00
(ii) 1 Job Only $34.00
11 Delivery Vehicles based on gross vehicle
weight
Sec. 19-54
12 Farmer's Market Sec. 18-61
(a) Per Day $19.00
(b) Plus fee per concession $6.00
13 Gardener $44.00 Sec. 18-61
14 Gas Station $64.00 plus employees Sec. 18-61
15 Handyman $44.00 Sec. 18-61
16 Handbills, advertising samples $254.00 Sec. 18-61
(a) Plus per person $25.00
(b) Plus per day $25.00
Activity Description
53

Page 62 of 136 ends

12.D

Page 224 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUSINESS LICENSE FEES
Activity Description Fee Charge Basis Code
17 Ice Cream Truck $104.00 per vehicle Sec. 18-62
18 Massage $44.00 plus clearance from the
Police Dept.

Sec. 18-211
19 Motion Picture refer to
Planning first
Sec. 18-181
20 Nursing Homes Sec. 18-450
(a) 6 or less not required
(b) 7 or more $44.00
21 Property Rental Sec. 18-56
(a) For 3 units $44.00
(b) per each additional over 3 $1.00
22 Service - Retail $44.00 plus employees Sec. 18-57
23 Secondhand Dealers $154.00 Sec. 18-61
24 Solicitors Sec. 18-61
(a) For 6 Months $104.00
(b) Per Day $10.00
25 Shoeshine Stand $14.00 Sec. 18-61
26 Shooting Gallery $104.00 plus employees Sec. 18-61
27 Social Club $104.00 Sec. 18-61
28 Tobacco Retailers refer to
Planning first
Sec. 18-410
29 Taxi $44.00 plus clearance from the
Police Dept.

Sec. 18-52
30 Theatre $54.00 Sec. 18-61
a) Plus fee per seat for 1st 500 seats $0.10
b) Plus fee per seat over 500 seats $0.05
31 Temporary Events Sec. 18-61
(a) Per day $19.00
(b) Plus fee per concession $5.00
32 Vending - Food Vehicle $104.00 Sec. 18-61
33 Vending - Laundry based on gross receipts Sec. 18-59 34 Vending - Machine (Intangible) based on gross receipts Sec. 18-55 35 Vending - Machine (Tangible) based on gross receipts Sec. 18-55 54

Page 63 of 136 ends

12.D

Page 225 of 1938 ends

City of Hemet

MASTER FEE SCHEDULE - BUSINESS LICENSE FEES
Activity Description Fee Charge Basis Code
Fee for Employees (based on Full Time Equivalent)
NOT APPLICABLE TO CONTRACTORS OR "SPECIAL" TYPE BUSINESS LISTED IN SEC 18-61
36 1-2 $10.00
37 3-6 $30.00
38 7-10 $50.00
39 11-14 $70.00
40 15-20 $100.00
41 21-30 $120.00
42 31-40 $150.00
43 41-50 $200.00
44 51+ $200.00
1 full time employee = 1 full time equivalent
3 part-time employees = 1 full time equivalent
* No license required for those under 18 years of age or 65 years of age with gross income from business < $600.00 ** Fees listed include SB1186 tax of $4
55

Page 64 of 136 ends

12.D

Page 226 of 1938 ends

Schedule of Current Fees and Proposed Fees

Page 65 of 136 ends

12.D

Page 227 of 1938 ends

FEE SCHEDULE PAGE
Building Fees 1
Fire Prevention Fees 25
Planning Fees 34
Engineering Fees 40
Public Works Fees 50
Police Fees 55
Code Enforcement Fees 57
Finance Fees 58
City Clerk Fees 59
Library Fees 60
Facility Rental Rates and Charges 61
Business License Fees 63
Table of Contents

Page 66 of 136 ends

12.D

Page 228 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Unit Adjustment Note
1 Permit Processing Fee (Applies to All Permits Issued) $85 $92 CPI 2 Minimum Permit Fee - Commercial $381 $414 CPI 3 Minimum Permit Fee - Residential $212 $230 CPI 4 Technology Fee (% of valuation) valuation x .002 valuation x .002 n/a 5 Strong Motion Instrumentation (SMI) Fee Calculation a) Residential $0.50 or valuation x .00013 $0.50 or valuation x .00013 n/a b) Commercial $0.50 or valuation x .00028 $0.50 or valuation x .00028 n/a 6 Building Standards (SB 1473) Fee Calculation (Valuation) a) $1 - $25,000 $1 $1 n/a
b) Each Add'l $25,000 or fraction thereof Add $1 Add $1 n/a 7 Certificate of Occupancy
a) Temporary Certificate of Occupancy $677 $736 CPI
b) Certificate of Occupancy
i) 1 - 5000 sq ft $226 $245 CPI
ii) 5001 - 25,000 sq ft $338 $368 CPI
iii) each additional 25,000 sq ft $85 $92 CPI
8 Change of Use $338 $368 CPI 9 Change of Address $169 $184 CPI Permit Processing and Other Fees
Activity Description
1

Page 67 of 136 ends

12.D

Page 229 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Unit Adjustment Note
Permit Processing and Other Fees
Activity Description
Copies, Re-Print, Change Of Contractor
10 Printing Scanned / Archived Drawings actual cost plus $40 per 15 min. of staff time
actual cost plus $46
per 15 min. of staff time
CPI [a]
11 Job Card / Permit Re-Print $42 $46 CPI
Violation Fees
12 Work Done Without Permits Per Hemet Municipal Code. Per Hemet Municipal Code. n/a Other Fees
13 Permit / Plan Review Extension $85 $92 each CPI
14 Planning & Fire Plan Review Processing Fee $85 $92 each CPI 15 Planning & Fire Permit Processing Fee $85 $92 each CPI 16 Excess Plan Review Fee (for 3rd and subsequent reviews) $169 $184 per hour CPI 17 Expedited Plan Review 1.5x Base Plan Review Fee 1.5x Base Plan Review Fee n/a 18 Partial Inspection / Extra Inspection Fee (per inspection) $85 $92 each CPI 19 Re-inspection Fee Per California Building Code and Hemet Municipal Code as Amended
$85 $92 each CPI
20 Missed inspection Fee $85 $92 each CPI
21 After Hours Inspections (Overtime) $203 $221 per hour CPI 22 Records Research $169 $184 per hour CPI
23 Month or Yearly Building Permit Activity $85 $92 CPI 24 Special Inspector Registration n/a $92 CPI
2

Page 68 of 136 ends

12.D

Page 230 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Unit Adjustment Note
Permit Processing and Other Fees
Activity Description
25 Microfilm Fee
a) 11" x 17" or less (per page) $1 $1 per page n/a
b) Over 11" x 17" (per sheet) $6 $6 per sheet n/a
26 Plan Storage valuation x .00018 valuation x .00018 n/a 27 Training Fee (% of valuation) valuation x .0003 valuation x .0003 n/a 28 Credit Card Transaction Processing Fee (% of Fees Paid by Credit Card) 3% 3% n/a 29 Fees for Services Not Listed in this Fee Schedule (per 1/2 hour) $85 $92 CPI [a] Printing Scanned / Archived Drawings-Price of printing service, consultant services actual fee plus $184/hour of staff time, charged in 15 minute increments, to research, review, and pick up from service.
3

Page 69 of 136 ends

12.D

Page 231 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection Fee Plan Review Fee Permit Inspection Fee Adjustment Note Electrical Panel/Pedestal
1 Electrical Pedestal/Panel Install or Upgrade (Max 200 AMP) $296 $322 CPI HVAC Change-Out
2 HVAC Change-Out (Residential) $254 $276 CPI 3 HVAC Change-Out (Commercial) a) First Unit $296 $322 CPI
b) Each Additional Unit $42 $46 CPI
Re-Pipe
4 Re-Pipe of SFR $85 $381 $92 $414 CPI
Reroof
5 Reroof Of Non Habitable Space <500 SF $254 $276 CPI 6 Reroof SFR a) <4,000 SF $338 $368 CPI
b) <4,000 SF From Composition To Tile $127 $423 $138 $460 CPI 7 Reroof Commercial
a) 25,000 SF or less $423 $460 CPI
b) Each additional 25,000 SF $85 $92 CPI
Commonly Requested Minor Permits
Activity Description
Fees for Commonly Requested Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Current Fees Proposed Fees
4

Page 70 of 136 ends

12.D

Page 232 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection Fee Plan Review Fee Permit Inspection Fee Adjustment Note Commonly Requested Minor Permits
Activity Description
Fees for Commonly Requested Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Current Fees Proposed Fees
Solar / Photovoltaic
8 Solar Streamline Permit $381 $414 CPI 9 Solar / Photovoltaic Roof Mounted a) Less than 50kw $169 $169 $184 $184 CPI
b) 50kw - 250kw $254 $338 $276 $368 CPI
c) Above 250kW $677 $846 $736 $920 CPI
10 Solar / Photovoltaic Ground Mounted
a) Less than 50kw $254 $254 $276 $276 CPI
b) 50kw - 250kw $338 $423 $368 $460 CPI
c) Above 250kW $846 $1,015 $920 $1,104 CPI
11 Battery Storage
a) First Battery $127 $296 $138 $322 CPI
b) Each Additional $42 $46 CPI
12 Battery Storage with Solar Installation
a) First Battery $85 $42 $92 $46 CPI
b) Each Additional $42 $46 CPI
13 Residential EV Charging Plug $85 $169 $92 $184 CPI
Tub to Walk-In Shower
14 Tub To Walk In Shower $85 $254 $92 $276 CPI
Wall Heater Replacement
15 Wall Heater Residential Replacement $212 $230 CPI
5

Page 71 of 136 ends

12.D

Page 233 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection Fee Plan Review Fee Permit Inspection Fee Adjustment Note Commonly Requested Minor Permits
Activity Description
Fees for Commonly Requested Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Current Fees Proposed Fees
Water Heater Replacement
16 Water Heater Residential Replacement $127 $138 CPI
Window Change-Out
17 Window Change-out $85 $127 $92 $138 CPI
Block and Retaining Walls
18 Block 50' or less 6' in height or less $254 $254 $276 $276 CPI a) Each additional 100' $42 $46 CPI
19 Block Wall Over 6' in height 50' in length $338 $338 $368 $368 CPI a) Each additional 100' $56 $61 CPI
20 Retaining Wall 50' or less 6' in height or less $338 $338 $368 $368 CPI a) Each additional 100' $56 $61 CPI
21 Retaining Wall Over 6' in height 50' in length $423 $423 $460 $460 CPI a) Each additional 100' $71 $77 CPI
Special Inspection and Housing Assessment
22 Special Housing Inspection $254 $276 CPI
23 Housing Assessment Permit $423 $460 CPI
6

Page 72 of 136 ends

12.D

Page 234 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
1 100 $1,692 $1,839 CPI
200 $1,861 $2,023 CPI
300 $1,946 $2,115 CPI
400 $2,115 $2,299 CPI
500 $2,284 $118 $2,483 $129 CPI
1,000 $2,877 $102 $3,127 $110 CPI
1,500 $3,384 $135 $3,679 $147 CPI
2,000 $4,061 $203 $4,415 $221 CPI
2,500 $5,077 $203 $5,518 $221 CPI
3,000 $6,092 $102 $6,622 $110 CPI
4,000 $7,107 $68 $7,726 $74 CPI
5,000 $7,784 $51 $8,461 $55 CPI
2 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 3 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 4 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 5 Production Phase Units /
Identical Buildings
10% of Base Plan Review Fee;
100% of Base Permit Inspection Fee
10% of Base Plan Review Fee;
100% of Base Permit Inspection Fee
n/a [a]
[a] For identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time. * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. ** Amounts exclude City of Hemet standard Permitting fees and State of California fees.

New Construction and Residential Additions
R3 - Single-Family, Duplex,
Additional Dwelling Units
New Construction, Room
Addition, Garage
Current Fees Proposed Fees
7

Page 73 of 136 ends

12.D

Page 235 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
1 100 $677 $736 CPI
200 $1,015 $1,104 CPI
300 $1,565 $1,701 CPI
400 $1,692 $1,839 CPI
500 $1,861 $68 $2,023 $74 CPI
1,000 $2,200 $51 $2,391 $55 CPI
2 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 3 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 4 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. ** Amounts exclude City of Hemet standard Permitting fees and State of California fees.

R3 - Single-Family, Duplex,
Additional Dwelling Units
Garage/Room Conversions
and Residential Remodels
with Structural Improvements
Garage/Room Conversions and Residential Remodels with Structural Improvements Current Fees Proposed Fees
8

Page 74 of 136 ends

12.D

Page 236 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
1 100 $592 $644 CPI
200 $931 $1,012 CPI
300 $1,396 $1,518 CPI
400 $1,523 $1,655 CPI
500 $1,692 $68 $1,839 $74 CPI
1,000 $2,031 $51 $2,207 $55 CPI
2 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 3 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 4 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. ** Amounts exclude City of Hemet standard Permitting fees and State of California fees.

Garage/Room Conversions and Residential Remodels without Structural Improvements R3 - Single-Family, Duplex,
Additional Dwelling Units
Garage/Room Conversions
and Residential Remodels
without Structural
Improvements
Current Fees Proposed Fees
9

Page 75 of 136 ends

12.D

Page 237 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
1 500 $5,077 $135 $5,518 $147 CPI
1,000 $5,753 $110 $6,254 $120 CPI
5,000 $10,153 $68 $11,037 $74 CPI
10,000 $13,537 $34 $14,715 $37 CPI
20,000 $16,922 $65 $18,394 $71 CPI
50,000 $36,551 $54 $39,732 $59 CPI
100,000 $63,626 $41 $69,162 $44 CPI
2 500 $3,300 $203 $3,587 $221 CPI
1,000 $4,315 $82 $4,691 $90 CPI
5,000 $7,615 $51 $8,277 $55 CPI
10,000 $10,153 $17 $11,037 $18 CPI
25,000 $12,691 $59 $13,796 $64 CPI
50,000 $27,413 $44 $29,799 $48 CPI
3 500 $4,738 $102 $5,150 $110 CPI
1,000 $5,246 $13 $5,702 $14 CPI
5,000 $5,753 $20 $6,254 $22 CPI
10,000 $6,769 $17 $7,358 $18 CPI
20,000 $8,461 $33 $9,197 $36 CPI
50,000 $18,276 $27 $19,866 $29 CPI
100,000 $31,813 $20 $34,581 $22 CPI
Commercial / Non-Residential - New Construction, Tenant Improvement, and Shell A, B, E, F, H, I, M, R4, S -
Assembly; Business; Care /
Assisted Living; Educational;
Factory; Hazard; Institutional;
Mercantile; Storage
New Construction / SF
Addition
A, B, E, F, H, I, M, R1, R2, R4, S -
Assembly; Business; Care /
Assisted Living; Educational;
Factory; Hazard; Institutional;
Mercantile; Hotel/Motel;
Apartment; Storage
Tenant Improvement
A, B, E, F, H, I, M, R4, S -
Assembly; Business; Care /
Assisted Living; Educational;
Factory; Hazard; Institutional;
Mercantile; Hotel/Motel;
Apartment; Storage
Shell
Current Fees Proposed Fees
10

Page 76 of 136 ends

12.D

Page 238 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
Commercial / Non-Residential - New Construction, Tenant Improvement, and Shell Current Fees Proposed Fees
4 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 5 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 6 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 7 Projects that Include SF
Addition and Tenant
Improvement
See Note [a] See Note [a] n/a
8 Foundation Only Permit See Note [b] See Note [b] n/a
[b] For foundation only permits, fee shall be 25% of regularly applicable permit fee. 100% of base fees will apply when actual permit is pulled. * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. * Amounts exclude City of Hemet standard Permitting fees and State of California fees. [a] For projects that include square footage addition and tenant improvements, fee calculated shall be 100% of the square footage addition or tenant improvement fee, whichever is greater, and 25% of the lower fee.
11

Page 77 of 136 ends

12.D

Page 239 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification # of Units Total
Base Fee
Fee Per
Add'l Unit
Total
Base Fee
Fee Per
Add'l Unit Adjustment Note
1 1 - 25 $18,952 $20,602 CPI
26 - 50 $37,566 $790 $40,835 $858 CPI
51 - 75 $56,519 $776 $61,437 $843 CPI
76 - 100 $75,133 $740 $81,670 $805 CPI
101+ Units $92,900 $555 $100,984 $604 CPI
2 1 - 10 $10,153 $11,037 CPI
11 - 25 $25,721 $1,668 $27,959 $1,813 CPI
26 - 50 $49,073 $1,029 $53,343 $1,119 CPI
51 - 75 $73,779 $1,001 $80,199 $1,088 CPI
76 - 100 $97,808 $1,001 $106,319 $1,088 CPI
101+ Units $121,837 $751 $132,438 $816 CPI
3 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 4 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 5 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 6 Production Phase Units /
Identical Buildings
10% of Base Plan Review Fee;
100% of Base Permit Inspection Fee
10% of Base Plan Review Fee;
100% of Base Permit Inspection Fee
n/a [a]
7 Tenant Improvement or Shell See Commerical / Non-Residential Fees See Commerical / Non-Residential Fees n/a [a] For identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time. * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. * Amounts exclude City of Hemet standard Permitting fees and State of California fees.

New Construction - R1 and R2 Occupancies
R1 Occupancy
Hotel/Motel/Other
New Construction / SF
Addition
R2 Occupancy
Apartment/Other
New Construction / SF
Addition
Current Fees Proposed Fees
12

Page 78 of 136 ends

12.D

Page 240 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Occupancy Classification Threshold SqFt Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Total
Base Fee
Fee Per
Add'l 100 SF or
Fraction Thereof
Adjustment Note
1 100 $423 $460 CPI
200 $508 $552 CPI
300 $592 $644 CPI
400 $719 $782 CPI
500 $846 $93 $920 $101 CPI
1,000 $1,311 $23 $1,426 $25 CPI
2 Patio, Carport, Awning -
Nationally Recognized
Approved Plan Set
$169 $184 CPI
3 Electrical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 4 Mechanical Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a 5 Plumbing Plan Review and
Permitting, if Required
10% of Plan Review and Permit Inspection Fee 10% of Plan Review and Permit Inspection Fee n/a * Plan review fees include up to two plan checks. The City will bill hourly for additional plan review required. ** Amounts exclude City of Hemet standard Permitting fees and State of California fees.

Awning / Balcony / Carport / Patio / Deck / Screen Room Awning / Balcony / Carport /
Patio / Deck / Screen Room /
Patio Enclosure
Current Fees Proposed Fees
13

Page 79 of 136 ends

12.D

Page 241 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection
Fee
Plan Review Fee Permit Inspection
Fee
Adjustment Note
Accessibility Ramp
1 Accessibility Ramp $169 $296 $184 $322 CPI
Cellular Antenna/Pole
2 Cellular Antenna/Pole $381 $338 $414 $368 CPI 3 Cellular Antenna/Pole Modification $169 $212 $184 $230 CPI Christmas Tree Lot/Pumpkin Patch/Similar Event
4 Christmas Tree/Pumpkin Patch $169 $254 $184 $276 CPI
Construction Trailer
5 Construction Trailer $296 $322 CPI
Demolition
6 Demolition - Patio Cover or Room $127 $138 CPI 7 Demolition - Swimming Pool or Building $338 $368 CPI Residential Building - New Door, Window, or Skylight
8 Door, Window or Skylight (Addition of New) $169 $381 $184 $414 CPI Drywall Repair
9 Drywall Repair
a) Up To 1,000 SF $212 $230 CPI
b) Each Add'l 1,000 SF or Fraction Thereof $42 $46 CPI
EVR System Upgrade
10 EVR System Upgrade $254 $508 $276 $552 CPI
Fence Building Permit
11 Fence - Residential $127 $184 $230 CPI
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Current Fees Proposed Fees
14

Page 80 of 136 ends

12.D

Page 242 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection
Fee
Plan Review Fee Permit Inspection
Fee
Adjustment Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Current Fees Proposed Fees
12 Fence - Commercial $254 $338 $276 $368 CPI
Flag Pole
13 Flag Pole - Greater Than Or Equal To 25' $254 $381 $276 $414 CPI 14 Flag Pole - Less Than 25' $169 $254 $184 $276 CPI
Fireplace
15 Fireplace $169 $592 $184 $644 CPI
Food Truck or Carnival Event
16 Food Truck or Carnival Event $169 $338 $184 $368 CPI Gas Line Building Permit - Max 500'
17 Gas Line Building Permit - Max 500' $127 $138 CPI
Generator
18 Generator
a) 10kW or less $85 $127 $92 $138 CPI
b) Over 10kW $127 $169 $138 $184 CPI
Landscape
19 Landscape - Minor Or Modification Of Existing $42 $169 $46 $184 CPI 20 Landscape - Major - New Construction $169 $169 $184 $184 CPI Meter Reset Residential
21 Meter Reset Residential $76 $83 CPI
Mobilehome Plan Review and Permit Fees
22 Standard Plan Mobile Home Park: Building Plan Check and Permit Fees (Fee Per Title 25 of California Code of Regulations)
See Title 25 CA
Code of
Regulations
See Title 25 CA
Code of
Regulations
See Title 25 CA
Code of
Regulations
See Title 25 CA
Code of
Regulations
n/a
15

Page 81 of 136 ends

12.D

Page 243 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection
Fee
Plan Review Fee Permit Inspection
Fee
Adjustment Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Current Fees Proposed Fees
Model Home Conversion to SFR
23 Model Home Conversion to SFR $0 $381 $0 $414 CPI
Parking Lot Re-Stripe
24 Parking Lot Re-Stripe
a) 1-2 Accessible Stalls $85 $127 $92 $138 CPI
b) Each Additional 2 Accessible Stalls $14 $14 $15 $15 CPI Sales Office and Model Home Complex for Tract
25 Sales Office and Model Home Complex For Tract $296 $592 $322 $644 CPI Septic System (New or Replace)
26 Septic System (New or Replace) $169 $338 $184 $368 CPI Sewer Hook Up
27 Sewer Hook Up $550 $598 CPI
Sewer Repair
28 Sewer Repair $296 $322 CPI
Siding / Stucco Repair
29 Siding / Stucco Repair $338 $368 CPI
Signs
30 Wall Sign $127 $127 $138 $138 CPI
31 Wall Sign Illuminated $212 $212 $230 $230 CPI
32 Monument Sign $169 $338 $184 $368 CPI
33 Monument Sign Illuminated $254 $381 $276 $414 CPI
34 Site Signage $338 $423 $368 $460 CPI
16

Page 82 of 136 ends

12.D

Page 244 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection
Fee
Plan Review Fee Permit Inspection
Fee
Adjustment Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Current Fees Proposed Fees
Spray Booth
35 Spray Booth $804 $423 $874 $460 CPI
Storage Racks
36 Storage Racks
a) Storage Racks - First 100 LF $169 $169 $184 $184 CPI b) Storage Racks - Each Additional 100 LF $14 $15 CPI
Swimming Pool - Commercial
37 Swimming Pool - Commercial $254 $1,269 $276 $1,380 CPI Swimming Pool and Spa - Residential
38 Swimming Pool Residential $761 $184 $828 CPI
39 Spa/Hot Tub Above Ground $423 $460 CPI
Tent Sale
40 Tent Sale No Generator $169 $338 $184 $368 CPI
41 Tent Sale W/Generator $212 $423 $230 $460 CPI
Trash Enclosure
42 Trash Enclosure $254 $423 $276 $460 CPI
Utilities - Temporary Commercial Electrical and Gas
43 Utilities - Temporary Commercial Electrical and Gas $254 $276 CPI Utilities to Shed
44 Utilities To Shed Elec Plumb Gas Building Permit $85 $212 $92 $230 CPI Wall Addition
45 Wall Addition - Interior Residential $254 $508 $276 $552 CPI 17

Page 83 of 136 ends

12.D

Page 245 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Plan Review Fee Permit Inspection
Fee
Plan Review Fee Permit Inspection
Fee
Adjustment Note
Miscellaneous Items Permits
Fees for Miscellaneous Building Permit Types. Fees shown in this section include all applicable inspection, and plan review fees). Additional fees apply for permit processing and services provided by other City Departments (e.g. Planning Review), Technology Enhancement Fees, and Fees Collected on Behalf of Other Agencies (e.g. State of California).

Activity Description
Current Fees Proposed Fees
46 Wall Addition With Plumbing - Interior Residential $338 $677 $368 $736 CPI 47 Wall Addition - Interior Commercial $338 $719 $368 $782 CPI 48 Wall Addition With Plumbing - Interior Commercial $423 $1,185 $460 $1,288 CPI 18

Page 84 of 136 ends

12.D

Page 246 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note

STAND ALONE PERMIT FEES
Temporary Electrical Service
1 Temporary Electrical, Prior To Final $254 $276 CPI 2 Temporary Electrical W/Gas Release $338 $368 CPI 3 Temporary Power Pole $169 $184 CPI 4 Span Poles $14 $15 CPI

ALL OTHER PERMIT FEES
Receptacles, Switches, Fixtures, and Outlets
5 Each receptacle, switch, fixture, or outlet, lights $6 $6 each CPI Residential Appliances
6 For fixed residential appliances or receptacle outlets for same, including wallmounted electric ovens; counter-mounted cooking tops; electric ranges; selfcontained room, console or through-wall air conditions; space heater; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding 1 horsepower (HP) $8 $9 each CPI
Non-Residential Appliances
7 For nonresidential appliances and self-contained factory-wired, nonresidential appliances not exceeding 1 horsepower (HP), kilowatt (kW) or kilovolt-ampere (kVA) in rating, including medical and dental devices; food, beverage and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment.
$8 $9 each CPI
Power Apparatus
8 Power Apparatus: Up To 1 HP, kW, Or kVA $8 $9 each CPI 9 Power Apparatus: 1- 10 HP, kW, Or kVA $28 $31 each CPI 10 Power Apparatus: 11 - 50 HP, kW, Or kVA $42 $46 each CPI 11 Power Apparatus: 50 - 100 HP, kW, Or kVA $85 $92 each CPI Electrical Permit Fees
Activity Description
19

Page 85 of 136 ends

12.D

Page 247 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
Electrical Permit Fees
Activity Description
12 Power Apparatus: > 100 HP, kW, Or kVA $127 $138 each CPI Busways and Trolley
13 Busways-Plug In Type, Each 100 FT $8 $9 each CPI
14 Trolly, Each 100 FT $8 $9 each CPI
Signs, Outline Lighting and Marquees
15 For signs, outline lighting systems or marquees supplied from one branch circuit $42 $46 each CPI 16 For additional branch circuits within the same sign, outline lighting system or marquee
$8 $9 each CPI
Services (Service Change)
17 Service: Up To 600 Volts And 200 Amperes $42 $46 each CPI 18 Services: Up To 600 Volts And 201-1,000 Amperes $85 $92 each CPI 19 Service: Over 600 Volts Or Over 1,000 Amperes $127 $138 each CPI Temporary Power Service
20 Temporary Pedestal $42 $46 each CPI
21 Temporary Distribution System $14 $15 each CPI
22 Temporary Lighting $14 $15 each CPI
Carnivals and Circuses
23 Generator $28 $31 each CPI
24 For electrical generators and electrically drive rides $28 $31 each CPI 25 For mechanically driven rides and walk-through attractions or displays having electric lighting
$8 $9 each CPI
26 For a system of area and booth lighting $8 $9 each CPI Miscellaneous Apparatus, Conduits and Conductors
27 For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth.
$28 $31 each CPI
20

Page 86 of 136 ends

12.D

Page 248 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note

STAND ALONE PERMIT FEES
Commercial Hood & Duct
1 Commercial Hood & Duct $423 $460 each CPI

ALL OTHER PERMIT FEES
Furnaces
2 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, a) Up to and including 100,000 Btu/h (29.3 kW) $20 $21 each CPI b) Over 100,000 Btu/h (29.3 kW) $28 $31 each CPI
3 For the installation or relocation of each floor furnace, including vent. $20 $21 each CPI 4 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater.
$20 $21 each CPI
Appliance Vents
5 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit.
$8 $9 each CPI
Repairs or Additions
6 For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code.
$20 $21 each CPI
Boilers, Compressor and Absorption Systems
7 For the installation or relocation of each boiler or compressor or absorption system: a) Up to 3 HP; and including 100,000 Btu/h (29.3 kW) $20 $21 each CPI b) Over 3 HP; Over 100,000 Btu/h (29.3 kW) $34 $37 each CPI Air Handlers
8 For each air-handling units to and including 10,000 cubic feet per minute (CFM), including ducts attached thereto.
$14 $15 each CPI
Mechanical Permit Fees
Activity Description
21

Page 87 of 136 ends

12.D

Page 249 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
Mechanical Permit Fees
Activity Description 9 For each air-handling unit over 10,000 CFM $28 $31 each CPI Evaporative Coolers
10 For each evaporative cooler other than portable type $14 $15 each CPI Ventilation and Exhaust
11 For each ventilation fan connected to a single duct $8 $9 each CPI 12 For each ventilation system which is not a portion of any heating or airconditioning system authorized by a permit$14 $15 each CPI 13 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood.
$14 $15 each CPI
Incinerators
14 For the installation or relocation of each domestic-type incinerator $28 $31 each CPI 15 For the installation or relocation of each commercial of industrial-type incinerator
$85 $92 each CPI
Miscellaneous
16 For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which other fee is listed in the table.
$14 $15 each CPI
22

Page 88 of 136 ends

12.D

Page 250 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note

STAND ALONE PERMIT FEES
Gas Connection / Release Prior To Final
1 Gas Connection Prior To Final $254 $276 CPI 2 Gas Release Prior To Final W/Elec Release $338 $368 CPI

ALL OTHER PERMIT FEES
Fixtures and Vents
3 For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection thereof)
$14 $15 each CPI
4 For repair or alteration of drainage or vent piping $6 $6 each CPI Sewers, Disposal Systems and Interceptors
5 For each residential building sewer and each trailer park sewer $42 $46 each CPI 6 For each cesspool $42 $46 each CPI 7 For each private sewage disposal system, ex: septic tank $85 $92 each CPI 8 For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps $42 $46 each CPI
9 Rainwater systems - per drain (inside building) $14 $15 each CPI Water Piping, Water Heaters and Water Softeners
10 For installation, alteration, or repair of water piping or water-treating equipment, or both
$6 $6 each CPI
11 For each water heater including vent $20 $21 each CPI 12 For each water softener n/a $21 each CPI
Gas Piping Systems
13 Gas Piping: 1-4 Outlets $6 $6 each CPI
14 Gas Piping: 5 Or More, Per Outlet $3 $3 each CPI
Plumbing Permit Fees
Activity Description
23

Page 89 of 136 ends

12.D

Page 251 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUILDING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
Plumbing Permit Fees
Activity Description
Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices 15 For each lawn sprinkler system on any one meter, including backflow protection devices thereof
$20 $21 each CPI
16 For each backflow-protection device 2 inches and smaller $20 $21 each CPI 17 For each backflow-protection device over 2 inches $42 $46 each CPI Miscellaneous
17 For each appliance or piece of equipment regulated by the Plumbing Code but not classed in other appliance categories, or for which no other fee is listed in this code.
$20 $21 each CPI
24

Page 90 of 136 ends

12.D

Page 252 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
1 Administrative Permit Processing Fee $71 $77 CPI

FIRE SPECIFIC ITEMS
2 Water Based Fire Protection Systems (1)
a) Fire Sprinkler Commercial/Multi Family/Other - New System i) Plan Review (up to 100 heads) $423 $460 per installation CPI ii) Inspection (up to 100 heads) $508 $552 per installation CPI b) Fire Sprinkler Commercial/Multi Family/Other - Alteration i) Plan Review (up to 25 heads) $212 $230 per installation CPI ii) Inspection (up to 25 heads) $254 $276 per installation CPI c) Fire Sprinkler, Per additional head - New or Alteration i) Plan Review $2 $2 per head CPI
ii) Inspection $2 $2 per head CPI
d) Fire Sprinkler Single Family/Duplex - New System
i) Plan Review $338 $368 per installation CPI
ii) Inspection $508 $552 per installation CPI
e) Fire Sprinkler Single Family/Duplex - Alteration of Existing System i) Plan Review $127 $138 per installation CPI
ii) Inspection $254 $276 per installation CPI
f) Standpipe
i) Plan Review (per standpipe system) $338 $368 per system CPI ii) Inspection (per standpipe system) $677 $736 per system CPI g) Fire Protection Underground System
i) Plan Review $508 $552 each CPI
ii) Inspection $677 $736 each CPI
h) Fire Pump
i) Plan Review $338 $368 each CPI
ii) Inspection $338 $368 each CPI
i) Per Additional Sprinkler Riser or Hydrant
i) Plan Review $169 $184 each CPI
ii) Inspection $338 $368 each CPI
Activity Description
25

Page 91 of 136 ends

12.D

Page 253 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 3 Fire Alarm System (1):
a) Fire Alarm - New System
i) Plan Review (up to 25 devices) $296 $322 per system CPI ii) Inspection (up to 25 devices) $423 $460 per system CPI b) Fire Alarm - New System
i) Plan Review (> 25 devices) $508 $552 per system CPI
ii) Inspection (> 25 devices) $508 $552 per system CPI
c) Fire Alarm - Alteration
i) Plan Review (up to 5 devices) $169 $184 per system CPI ii) Inspection (up to 5 devices) $254 $276 per system CPI 4 Alternative Automatic Extinguishing Systems (2):
a) Dry, Wet, CO2, Halon, UL 300, Clean Agent, Spray Booth, Other i) Plan Review $254 $276 per system CPI
ii) Inspection $381 $414 per system CPI
5 Other Fire Construction Reviews and Inspections (2):
a) LPG, Cryogenics, Compressed Gas, Medical Gas, Battery Storage Systems, Industrial Oven, High-Piled Storage, and other Fire Construction Permit i) Plan Review $423 $460 per system CPI ii) Inspection $508 $552 per system CPI
b) Emergency Responder Radio Coverage
i) Plan Review & Coordination Deposit (3) $508 $552 per system CPI ii) Inspection & Coordination Deposit (3) $1,015 $1,104 per system CPI c) Public School Access & Water Supply Plan Check (hourly) - Minimum 1 hour review deposit required (3)
$169 $184 per review CPI
d) Alternative Materials & Methods of Construction (hourly) - Minimum 1 hour review deposit required (3)
$169 $184 per review CPI
26

Page 92 of 136 ends

12.D

Page 254 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 6 Hazardous Activities Installation/Removal Permits (4):
a) Above Ground - Hazardous Materials Tank and/or Pipe Installation or Removal (1 tank)
$677 $736 per tank system CPI
b) Under Ground - Hazardous Materials Tank Installation, New System (1 tank) $677 $736 per tank system CPI c) Under Ground - Hazardous Materials Tank Removal (1 tank) $677 $736 per tank system CPI d) Under Ground - Hazardous Materials Tank Pipe Installation or Removal (per additional tank)
$677 $736 per tank CPI
e) Above Ground Tank or Underground Tank installation or removal (per additional tank)
$338 $368 per tank CPI
7 Fire Code Verification:
a) Operational permit Plan Review/Application Code Review and Presubmittal Planning Related Reviews (hourly) - Minimum 1/2 hour review deposit, additional time billed at hourly rate (3)
$85 $92 per 1/2 hour CPI
b) Operational permit inspection (hourly) - Minimum 2 hour review deposit, additional time billed at hourly rate (3)
$169 $184 per hour CPI
c) Special Events or Temporary Use Events (hourly) - Minimum 2 hour review deposit, additional time billed at hourly rate (3)
$169 $184 per hour CPI
d) Inspection Outside of Normal Work Hours - Hourly Rate (7) $203 $221 per hour CPI 8 Annual Inspection:
a) Above Ground - Flammable / Combustible Liquid Tank and/or Pipe (>10,000 gallons)
$677 $736 per tank system CPI
b) Above Ground - Flammable / Combustible Liquid Tank and/or Pipe (<10,000 gallons)
$338 $368 per tank system CPI
c) Underground Hazardous Materials Tank Inspection $635 $690 per tank system CPI d) CalARP Facility $508 $552 per site CPI
9 California Fire Code Verification $169 $184 per hour CPI

OTHER MISCELLANEOUS FEES
10 High Rise Building $212 $230 per floor CPI
11 Day Care Inspection
a) Residential (Child / Elderly / Community) Less Than 26 (per hour) $169 $184 CPI b) Residential (Child / Elderly / Community) 26 & Over (per hour) $169 $184 CPI 12 Detention Facilitites $338 $368 CPI
27

Page 93 of 136 ends

12.D

Page 255 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 13 Educational Facilities
a) 1 - 250 Students $0 $184 n/a
b) 251 - 500 Students $0 $368 n/a
c) > 500 Students $0 $736 n/a
14 Fire Clearance Inspection (5):
a) Less than 500 SqFt $127 $138 per certificate CPI
b) 501 - 1,000 SqFt $169 $184 per certificate CPI
c) 1,001 - 3,000 SqFt $254 $276 per certificate CPI
d) Greater than 3,000 SqFt $465 $506 per certificate CPI 15 Research $85 $92 per half-hour CPI
16 Re-Inspection Fee $169 $184 per hour CPI
17 Service Required in Excess of Standard. Applies to all fees listed in schedule. See footnote (6)
$169 $184 per hour CPI
18 Supplemental Plan Check Fee (per hour for more than two reviews) $169 $184 per hour CPI 19 Certificate of Occupancy
a) Temporary Certificate of Occupancy $127 $138 each CPI b) Certificate of Occupancy $127 $138 each CPI
20 Change of Use Inspection
a) Change of Use - 4,999 SF or Less $127 $138 each CPI
b) Change of Use - 5,000 - 9,999 SF $254 $276 each CPI
c) Change of Use 10,000 - 19,999 SF $508 $552 each CPI
d) Change of Use 20,000 SF or greater $1,015 $1,104 each CPI 21 New Construction Plan Check (8):
a) A - Assembly $423 $460 each CPI
b) B, I, M - Business, Institutional, Mercantile $338 $368 each CPI c) F, S, H - Factory, Storage, Hazardous $423 $460 each CPI d) All Tenant Improvements $254 $276 each CPI
e) U - Utility Structures and Buildings $169 $184 each CPI 28

Page 94 of 136 ends

12.D

Page 256 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 22 Technology Fee (percent of permit fee) 5% 5% % of fee n/a 23 Work Without a Permit 2x applicable fee 2x applicable fee n/a 24 Special Request for Fire Department Personnel Services a) Fire Prevention Personnel and Contract Support $169 $184 per person; per hr. CPI b) Fire Operations Staff overtime rate by
rank
overtime rate by
rank
per person; per hr. n/a
25 Fees for Services Not Listed in this Fee Schedule $169 $184 per person; per hr. CPI 26 Assembly A-1, A-4, A-5 Occupancy Fire Permit $372 $405 CPI 27 Assembly A-2, A-3, Shell, VTI, TI Occupancy Fire Permit $197 $214 CPI 28 Business Fire Permit $169 $184 per each 10,000 sq ft CPI 29 Commercial Carport Plan Fire Permit $197 $214 CPI
30 Carport Commercial Fire Plan Review $197 $214 CPI
31 Commercial Interior Wall Addition Fire Permit $85 $92 CPI 32 F-2 Occupancy IIA, IIIA, VA, IV, IIB, IIIB, VB Fire Permit $381 $414 CPI 33 F-2 Occupancy IA, IB $197 $214 CPI
34 F Shell Occupancy IIA, IIB, IIIA, IIIB, VA, VB Fire Permit $212 $230 CPI 35 Generator Fire Permit $85 $92 CPI
36 Generator Fire Plan Review $85 $92 CPI
37 Hazardous Occupancy Fire Permit $931 $1,012 CPI
38 Institutional Occupancy $338 $368 CPI
39 Multi-Family 3+ Units Fire Permit
a) Up to 10 buildings $197 $214 CPI
b) Each building over 10 $20 CPI
40 Multi-Family 3+ Units Fire Plan Review $292 $318 CPI 41 Photovoltaic Commercial Fire Plan Review $102 $111 CPI 29

Page 95 of 136 ends

12.D

Page 257 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 42 Photovoltaic Fire Permit $102 $111 CPI
43 Special Event Fire Permit $54 $59 CPI
44 Tent Commercial Sale Generator Fire Permit $102 $111 CPI 45 Tent Commercial Sale No Generator Fire Permit $85 $92 CPI 46 Fire Tenant Improvement Plan Review Fee $197 $214 CPI 47 False Alarm Penalties (within 12 months)
a) Permitted
i) First Response No Charge No Charge n/a
ii) Second Response $100 $100 n/a
iii) Third Response $125 $125 n/a
iv) Fourth Response $150 $150 n/a
v) Fifth Response $175 $175 n/a
vi) Each Additional Response $200 $200 n/a
b) Non-Permitted
i) First Response Warning Warning n/a
ii) Second Response $200 $200 n/a
iii) Third Response $250 $250 n/a
iv) Fourth Response $300 $300 n/a
v) Fifth Response $350 $350 n/a
vi) Each Additional Response $400 $400 n/a

OPERATIONAL PERMITS
48 Operational Permits
a) Initial Permit $184 see Operational
Permits Worksheet
CPI
b) Each Additional Permit $46 see Operational
Permits Worksheet
CPI
30

Page 96 of 136 ends

12.D

Page 258 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note (1) Fee includes up to two plan checks or three inspections. Additional costs to be recovered at staff hourly rate. (2) Fee includes up to two plan checks or two inspections. Additional costs to be recovered at staff hourly rate. (3) Actual costs - may also be charged by actual costs using the fully burdened hourly rates plus any outside consultant costs if applicable.

Review time exceeding initial hours assumed for establishing deposit is billed at hourly rate. (4) Fee includes plan check and up to two inspections. Additional costs to be recovered at staff hourly rate. (5) Fee includes research and up to two inspections. Additional costs to be recovered at staff hourly rate. (6) Each fee listed in this schedule is based on the estimated number of hours required to perform a standard service request.

The standard number of hours estimated can be calculated by dividing the fee amount by $184, the Division's fully-burdened hourly rate.

For example, a fee amount of $368 assumes roughly 2 hours will be required to perform a standard request for the fee related service.

Review and inspection efforts that exceed the standard number of hours used to calculate the fee by more than one hour will be billed hourly for any time spent in excess of the standard hours built into the fee. (7) Inspection outside normal work hours will require hourly fees in addition to other required fees. (8) Planning submittals for fire review and related correspondence, meetings, etc. may be charged for at hourly rate during the construction plan review. 31

Page 97 of 136 ends

12.D

Page 259 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES

OPERATIONAL PERMITS
CFC 105.6: Required Operational Permits
The fire code official is authorized to issue operational permits for the operations set forth in 105.5.2 through 105.5.52 Code
Additive Manufacturing 105.5.1
Aerosol Products, Aerosol Cooking Spray Products and Plastic Aerosol 3 Products in excess of 500lbs 105.5.2 Amusement Buildings 105.5.3
Aviation Facilities 105.5.4
Carnivals and Fairs 105.5.5
Cellulose Nitrate Film 105.5.6
Combustibles Dust-Producing Operations 105.5.7
Combustible Fibers 105.5.8
Compressed Gases 105.5.9
Covered and Open Mall Buildings 105.5.10
Cryogenic Fluids 105.5.11
Cutting and Welding 105.5.12
Dry Cleaning 105.5.13
Energy Storage Systems 105.5.14
Exhibits and Trade Shows 105.5.15
Explosives 105.5.16
Fire Hydrants and Valves 105.5.17
Flammable and Combustibles 105.5.18
Floor Finishing 105.5.19
Fruit and Crop Ripening 105.5.20
Fumigation and Insecticidal Fogging 105.5.21
Hazardous Materials 105.5.22
HPM Facilities 105.5.23
High-Piled Storage 105.5.24
Hot Works Operations 105.5.25
Industrial Ovens 105.5.26
Lumber Yards and Woodworking Plants 105.5.27
Liquid-or Gas-Fueled Vehicles or Equipment in Assembly Buildings 105.5.28 LP-Gas 105.5.29
Magnesium 105.5.30
Miscellaneous Combustible Storage 105.5.31
Mobile Fueling of Hydrogen-Fueled Vehicles 105.5.32
Motor Fuel-Dispensing Facilities 105.5.33
Open Burning 105.5.34
Open Flames and Torches 105.5.35
Open Flames and candles 105.5.36
Organic Coatings 105.5.37
Outdoor assembly Event 105.5.38
Places of Assembly 105.5.39
Plant Extraction Systems 105.5.40
Description
32

Page 98 of 136 ends

12.D

Page 260 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FIRE PREVENTION FEES

OPERATIONAL PERMITS
CFC 105.6: Required Operational Permits
The fire code official is authorized to issue operational permits for the operations set forth in 105.5.2 through 105.5.52 Description Code
Private Fire Hydrants 105.5.41
Pyrotechnic Special Effects Material 105.5.42
Pyroxylin Plastics 105.5.43
Refrigeration Equipment 105.5.44
Repair Garages and Motor Fuel-Dispensing Facilities 105.5.45 Rooftop Heliports 105.5.46
Spraying or Dipping 105.5.47
Storage of Scrap Tires and Tire Byproducts 105.5.48
Temporary Membrane Structures and Tents 105.5.49
Tire-Rebuilding Plants 105.5.50
Waste Handling 105.5.51
Wood Products 105.5.52
33

Page 99 of 136 ends

12.D

Page 261 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Charge Basis Adjustment Note
Agreement
1 Density bonus Agreement $3,394 $3,690 CPI [a] 2 Development Agreement a) Agreement $20,000 $20,000 Deposit n/a [a]
b) Agreement Amendment $10,000 $10,000 Deposit n/a [a]
Application
3 SDR Modification - Minor (CDDR) $2,411 $2,621 CPI 4 Administrative Adjustment (Zoning standards) $916 $996 CPI 5 Administrative Use a) Permit (CDDR) $4,176 $4,539 CPI
b) Permit Modification $2,080 $2,261 CPI
6 Adult Business Permit $8,243 $8,960 CPI 7 Alcoholic Beverage Control Review - Finding of Public Convenience or Necessity (CDDR)
$2,090 $2,271 CPI
8 Annexation $10,000 $10,000 Deposit n/a [b] 9 Appeals
a) Community Development Director Decision $1,466 $1,594 CPI b) Planning Commission Decision $1,466 $1,594 CPI
10 Certificate of Compliance (Not Including Lot Line Adjustment) $839 $912 CPI 11 Conditional Use Permit (CUP)
a) Major $8,845 $9,614 CPI
b) Minor $6,305 $6,854 CPI
c) Modification $5,689 $6,184 CPI
12 Conditions of Approval - Amendment $3,426 $3,724 CPI 13 Conversion from Senior Housing Permit- (PC) $7,938 $8,629 CPI Activity Description
Current Fees Proposed Fees
34

Page 100 of 136 ends

12.D

Page 262 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Activity Description Charge Basis Adjustment Note
Current Fees Proposed Fees
14 Conversion to Condominiums $7,717 $8,389 CPI
15 Determination of Use (CDDR) $473 $515 CPI
16 Downtown Project Site Development Review
a) Major - PC $3,218 $3,498 CPI
b) Minor - CDDR $1,283 $1,395 CPI
17 Extension of Time - Community Development Director Review $2,227 $2,421 CPI 18 Extension of Time - Planning Commission Review $3,510 $3,816 CPI 19 General Plan Amendment (GPA)
a) Text/Policy Change - Major $10,000 $10,000 Deposit n/a [c] b) Text/Policy Change - Minor $4,416 $4,800 CPI
c) Land Use or Circulation Map Change $8,000 $8,000 Deposit n/a [d] 20 Habitat Acquisition and Negotiation Strategy (HANS) Application Review
$1,833 $1,992 CPI
21 Lot Line Adjustment $1,791 $1,946 CPI
22 Mobile Home Park Conversion $9,355 $10,169 CPI
23 Model Home Complex/Sales Office: Model Home Plan Complex $2,513 $2,732 CPI 24 Parcel Map Waiver $3,577 $3,889 CPI
25 Planned Community Development (PCD) $15,000 $15,000 Deposit n/a 26 Planned Community Development (PCD) Amendment $5,000 $5,000 Deposit n/a 27 Planned Unit Development (PUD) $10,000 $10,000 Deposit n/a 28 Planned Unit Development (PUD) Amendment $5,000 $5,000 Deposit n/a 29 Preliminary Application Review - conceptual $1,488 $1,618 CPI 30 SDR Modification - Major (PC)
a) Major (PC) $3,285 $3,571 CPI
b) Minor $1,459 $1,586 CPI
35

Page 101 of 136 ends

12.D

Page 263 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Activity Description Charge Basis Adjustment Note
Current Fees Proposed Fees
31 Sign Program
a) Minor Amendment (CDDR) $775 $843 CPI
b) Major Amendment (PC) $1,551 $1,686 CPI
32 Site Development Review (SDR)
a) Minor - CDDR $6,958 $7,564 CPI
b) Major- Commercial/industrial (PC) $10,251 $11,143 Base Fee Plus $15.00 per acre
CPI
c) Auto Center Review $4,328 $4,705 CPI
33 Site Development Review Major- residential (PC) $10,251 $11,143 Base Fee Plus $10.00 per unit
CPI
34 Small Group Home Permit $1,316 $1,430 CPI
35 Specific Plan $20,000 $20,000 Deposit n/a [c]
36 Specific Plan Amendment $10,000 $10,000 Deposit n/a [c] 37 Sphere Of Influence Amendment $15,000 $15,000 Deposit n/a [c] 38 Subdivision
a) Reversion to acreage/lot merger $4,356 $4,735 CPI
b) Amended Final Map $4,621 $5,023 CPI
39 Substantial Conformance Determination (Subdivision, SDR,CUP) (CDDR)
$4,849 $5,271 CPI
40 Tentative Map Revision/Resubmittal $6,302 $6,850 CPI 41 Tentative Parcel Map
a) Commercial/Industrial $7,556 $8,214 CPI
b) Residential $6,422 $6,980 CPI
36

Page 102 of 136 ends

12.D

Page 264 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Activity Description Charge Basis Adjustment Note
Current Fees Proposed Fees
42 Tentative Tract Map
a) Condominium or Conveyance $9,269 $10,076 Base Fee +
$15/acre
CPI
b) Residential $11,511 $12,513 Base Fee +
$15/lot
CPI
43 Variance (Major) $4,032 $4,383 CPI
44 Vesting Tentative Tract Map Actual Cost @
FBHR
[c]
45 Zone Change - map designation $8,120 $8,826 Plus GIS mapping fee
CPI [e]
46 Zoning Verification Letter $275 $299 CPI
47 Zoning Ordinance Amendment $3,000 $3,000 Deposit n/a [c] Direct Cost
48 Public Hearing Notice
a) Ad Publication $317 $345 CPI
b) Mail Out $367 $399 Plus postage
costs
CPI
Permit
49 Home Occupation Permit $92 $100 CPI
50 Homemade Food Operator
a) Permit $214 $232 CPI
b) Annual Renewal $92 $100 CPI
51 Permanent Sign Permit $183 $199 CPI
52 Temporary Sign/Banner Permit $92 $100 CPI
37

Page 103 of 136 ends

12.D

Page 265 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Activity Description Charge Basis Adjustment Note
Current Fees Proposed Fees
53 Temporary Use Permit
a) Permit $367 $399 Plus cost for
inspections, if
needed
CPI
b) Permit for Non-Profit Council
Determination
for no cost
Professional Services recovery for
54 City Attorney Review/Meeting Time FBHR FBHR Deposit n/a 55 Planning Division Hourly Rate for other services Actual Cost Actual Cost Deposit n/a [c] 56 Planning Research Fee Actual Cost Actual Cost Deposit n/a [c] Review
57 Airport Compatibility Study Review $962 $1,046 CPI
58 Airport Influence Area Review $367 $398 CPI
Technical Review
59 GIS - Mapping Fee $197 $215 Base Fee +
$10/acre
CPI
60 Mitigation Monitoring $2,000 $2,000 Deposit n/a [c]
61 Technical Study review Deposit for FBHR
- I hour
minimum
62 CEQA
a) Categorical Exemption $275 $299 CPI
b) Environmental Impact Report $20,000 $20,000 Deposit n/a [f] c) Initial Study w/Mitigated Negative Declaration $5,000 $5,000 Deposit n/a [f] d) Initial Study w/Negative Declaration $2,000 $2,000 Deposit n/a [f] 63 Credit Card Transaction Processing Fee 3% 3% % of fees paid by credit card
n/a
64 Building Plan Check $92 $100 CPI
38

Page 104 of 136 ends

12.D

Page 266 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PLANNING FEES
Fee
Initial
Deposit
Fee
Initial
Deposit
Activity Description Charge Basis Adjustment Note
Current Fees Proposed Fees
65 Planning Final Inspection $367 $398 CPI
66 Sidewalk Vendor Permit $367 $398 CPI
67 Food Truck Permit $367 $398 CPI
68 Commercial Cannabis Permit $8,990 $9,772 CPI
69 Special Events Permit $183 $199 CPI
70 Fees for Services Not Listed in this Fee Schedule
a) In-house Planning personnel $183 $199 per person; per hr.

CPI
b) Contract Service Support Actual Cost Actual Cost passthrough of actual cost
n/a
71 Metal Storage Container $410 $446 CPI
[a] Plus city attorney costs at fully burdened hourly rate. [b] Full cost deposit for staff time + deposit for city attorney time (minimum $10,000.00 + gis mapping fee). [c] Actual cost at fully burdened hourly rate.
[d] Deposit for full cost plus gis mapping fee.
[e] Plus GIS mapping fee.
[f] Full cost deposit + staff time deposit at 20% of contract amount + deposit for city attorney time. 39

Page 105 of 136 ends

12.D

Page 267 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
Land Subdivision
1 Parcel Map:
a) Final Parcel Map (up to 3 reviews)
i) Initial Sheet $3,955 $4,300 CPI
ii) Each Additional Sheet $1,187 $1,290 CPI
b) Final Parcel Map - Amendment
i) Initial Sheet $2,868 $3,117 CPI
ii) Each Additional Sheet $791 $860 CPI
c) Substantial Conformance Review
i) Initial Sheet $2,373 $2,580 CPI
ii) Each Additional Sheet $791 $860 CPI
2 Tract Map: (up to 3 reviews)
a) Final Tract Map
i) Initial Sheet $5,142 $5,590 CPI
ii) Each Additional Sheet $1,582 $1,720 CPI
b) Final Tract Map - Amendment
i) Initial Sheet $3,065 $3,332 CPI
ii) Each Additional Sheet $890 $967 CPI
c) Substantial Conformance Review
i) Initial Sheet $2,769 $3,010 CPI
ii) Each Additional Sheet $1,187 $1,290 CPI
3 Reversion to Acreage: (up to 3 reviews)
a) Initial Sheet $3,955 $4,300 CPI
b) Each Additional Sheet $791 $860 CPI
4 Lot Line Adjustment/Parcel Merger (up to 3 reviews)
a) Lot Line Adjustment $2,373 $2,580 CPI
b) Parcel Merger $2,373 $2,580 CPI
Activity Description
40

Page 106 of 136 ends

12.D

Page 268 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 5 Street Dedication/Vacation a) Summary $5,538 $6,020 CPI
b) Detailed $7,318 $7,954 CPI
6 Land Survey (up to 3 reviews)
a) Record of Survey $3,955 $4,300 CPI
b) Certificate of Correction $1,582 $1,720 CPI
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
a) Mass Grading / Stockpile
i) Initial Sheet $593 $645 CPI
ii) Each Additional Sheet $198 $215 CPI
iii) Revisions - Initial Sheet $99 $107 CPI
iv) Revisions - Each Additional Sheet $99 $107 CPI
b) Rough Grading
i) Initial Sheet $1,632 $1,774 CPI
ii) Each Additional Sheet $890 $967 CPI
iii) Revisions - Initial Sheet $1,384 $1,505 CPI
iv) Revisions - Each Additional Sheet $989 $1,075 CPI
c) Precise Grading - Commercial
i) Initial Sheet $1,780 $1,935 CPI
ii) Each Additional Sheet $1,384 $1,505 CPI
iii) Revisions - Initial Sheet $1,187 $1,290 CPI
iv) Revisions - Each Additional Sheet $989 $1,075 CPI
d) Precise Grading - Tract Homes
i) Initial Sheet $1,286 $1,397 CPI
ii) Each Additional Sheet $396 $430 CPI
iii) Revisions - Initial Sheet $692 $752 CPI
iv) Revisions - Each Additional Sheet $247 $269 CPI
41

Page 107 of 136 ends

12.D

Page 269 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note e) Precise Grading
i) Precise Grading - Infill Home $989 $1,075 CPI
ii) Precise Grading - Custom Home $1,187 $1,290 CPI
f) PM 10 (Fugitive Dust Control)
i) PM 10 Packet $494 $537 CPI
ii) PM 10 Full Size Plan $791 $860 CPI
iii) Revisions - Packet $396 $430 CPI
iv) Revisions - Full Size Plan $297 $322 CPI
g) Street Improvements
i) Initial Sheet $1,780 $1,935 CPI
ii) Each Additional Sheet $791 $860 CPI
iii) Revisions - Initial Sheet $1,187 $1,290 CPI
iv) Revisions - Each Additional Sheet $593 $645 CPI
h) Storm Drain
i) Initial Sheet $1,780 $1,935 CPI
ii) Each Additional Sheet $791 $860 CPI
iii) Revisions - Initial Sheet $1,187 $1,290 CPI
iv) Revisions - Each Additional Sheet $593 $645 CPI
i) Signing and Striping
i) Initial Sheet $1,582 $1,720 CPI
ii) Each Additional Sheet $791 $860 CPI
iii) Revisions - Initial Sheet $1,384 $1,505 CPI
iv) Revisions - Each Additional Sheet $791 $860 CPI
j) Traffic Signal
i) Initial Sheet $2,373 $2,580 CPI
ii) Each Additional Sheet $1,187 $1,290 CPI
iii) Revisions - Initial Sheet $989 $1,075 CPI
iv) Revisions - Each Additional Sheet $593 $645 CPI
42

Page 108 of 136 ends

12.D

Page 270 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note k) Sidewalk (when submitted separately from grading plan) i) Initial Sheet $593 $645 CPI
ii) Each Additional Sheet $297 $322 CPI
iii) Revisions - Initial Sheet $791 $860 CPI
iv) Revisions - Each Additional Sheet $396 $430 CPI
l) Traffic Control Plan $593 $645 CPI
m) Record Drawings Review
i) Initial Sheet $989 $1,075 CPI
ii) Each Additional Sheet $198 $215 CPI
n) Hydrology Report $2,373 $2,580 CPI
i) Revisions $989 $1,075 CPI
o) Traffic Study $2,373 $2,580 CPI
p) Traffic Letter $396 $430 CPI
q) Water Quality Mgmt. Plan Report (WQMP) $2,373 $2,580 CPI i) Revisions $989 $1,075 CPI
r) Stormwater Pollution Prevention Plan (SWPPP) $593 $645 CPI i) Revisions $198 $215 CPI
s) Sewer and Water - Onsite or Offsite
i) Initial Sheet $198 $1,075 restructured
ii) Each Additional Sheet $99 $430 restructured
iii) Revisions - Initial Sheet $99 $107 CPI
iv) Revisions - Each Additional Sheet $99 $107 CPI
8 Plan Review (per review>3 Reviews) $198 $215 per hour CPI 9 Expedited Plan Review Fee 1.5x fee 1.5x fee n/a [a] 10 Offsite Landscape Review Fee
a) Initial Sheet n/a $1,935 new fee
b) Each Additional Sheet n/a $860 new fee
c) Revisions - Initial Sheet n/a $107 new fee
d) Revisions - Each Additional Sheet n/a $107 new fee
43

Page 109 of 136 ends

12.D

Page 271 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 11 Street Light Review Fee
a) Initial Sheet n/a $1,720 new fee
b) Each Additional Sheet n/a $860 new fee
c) Revisions - Initial Sheet n/a $107 new fee
d) Revisions - Each Additional Sheet n/a $107 new fee
12 Building Submittal Review Fee n/a $215 per hour new fee 13 Easements
a) Dedication/Quitclaim $2,769 $3,010 CPI
b) Vacation $3,560 $3,870 CPI
14 Centerline Ties Review $1,582 $1,720 CPI
15 Import/Export Fee $0.35 $0.35 per cubic yard n/a
16 Special Financing District Formation (LMD, CFD, Etc.) $20,000 $30,000 Deposit n/a [b] 17 Permit Inspection (per permit)
a) Mass Grading / Stockpile
i) Per 1,000 CY $146 $159 CPI
b) Rough Grading
i) First 3 Acres $732 $796 CPI
ii) Each Additional Acre $110 $119 CPI
c) Precise Grading
i) Single Family Infill Lot $439 $478 CPI
ii) Single Family Custom Home Lot $586 $637 CPI
iii) Tract Home (per lot) $293 $318 CPI
iv) All Others
a) Without Rough Grading
i) First 3 Acres $732 $796 CPI
ii) Each Additional Acre $146 $159 CPI
b) Subsequent to Rough Grading
i) First 3 Acres $439 $478 CPI
ii) Each Additional Acre $73 $80 CPI
44

Page 110 of 136 ends

12.D

Page 272 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note d) Sewer and Water - Private On Site $220 $239 CPI
e) All Other (Including Public Improvements and Private Street Improvements) i) Engineer's Estimate - for first $250,000
a) Minimum Fee $1,172 $1,274 CPI
b) Percent of Engineer's Estimate 6% 6% n/a
ii) Engineer's Estimate - for next $250,000
a) Base Fee $12,013 $13,058 CPI
b) plus, Percent of Engineer's Estimate > $250,000 3% 3% n/a iii) Engineer's Estimate - for amount exceeding $500,000 a) Base Fee $19,630 $21,338 CPI
b) plus, Percent of Engineer's Estimate > $500,000 2% 2% n/a 45

Page 111 of 136 ends

12.D

Page 273 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note f) PM10 (per year)
i) Single Family Infill Lot <10,000 Sq Ft $586 $637 CPI [c] ii) > 10,000 Sq Ft - < 10 Acres $1,758 $1,911 CPI [c] , [d] iii) 10 - 50 Acres $2,637 $2,866 CPI [c] , [d]
iv) 51 - 200 Acres $3,516 $3,822 CPI [c] , [d]
v) > 200 Acres $4,395 $4,777 CPI [c] , [d]
18 Encroachment Permits
a) Minor Encroachment Work Inspection $366 $398 CPI
b) Street Improvements - Off-Site
i) Up to 500 LF $578 $628 CPI [e]
ii) 500 - 1,000 LF $867 $943 CPI [e] , [f]
iii) Each Additional 1,000 LF $578 $628 CPI [e] , [f]
c) Storm Drain Line
i) Up to 500 LF $1,156 $1,257 CPI
ii) 500 - 1,000 LF $2,023 $2,199 CPI [f]
iii) Each Additional 1,000 LF $867 $943 CPI [f]
d) Storm Drain Inlet/Outlet Structures
i) Up to 5 $578 $628 CPI
ii) Each Additional $145 $157 CPI
e) Off-site Signing and Striping
i) Up to 500 LF $578 $628 CPI [g]
ii) 500 - 1,000 LF $1,156 $1,257 CPI [f] , [g]
iii) Each Additional 1,000 LF $217 $236 CPI [f] , [g]
f) Traffic Signal $2,312 $2,513 CPI
g) Bond Reduction Request $1,662 $1,807 CPI
46

Page 112 of 136 ends

12.D

Page 274 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note h) Final Inspection/Acceptance
i) Single Family Lot <10,000 Sq Ft $145 $157 CPI [h]
ii) > 10,000 Sq Ft - < 2 Acres $434 $471 CPI [i]
ii) > 2 Acres - < 10 Acres $578 $628 CPI [i]
iii) > 10 - < 50 Acres $867 $943 CPI [i]
iv) > 50 - 200 Acres $1,156 $1,257 CPI [i]
v) > 200 Acres $1,445 $1,571 CPI [i]
i) Traffic Control
i) Up to Two Consecutive Days $181 $196 CPI [j]
ii) Three - Five Consecutive Days $434 $471 CPI
iii) Each Additional Consecutive Day (Up to 10 Days) $108 $118 CPI iv) 11+ Days (Up to 60 Calendar Days Max) $1,445 $1,571 CPI j) Cut/Bore/Vault/Pot Hole $289 $314 CPI
k) Driveway
i) Residential $181 $196 CPI
ii) Commercial $578 $628 CPI
l) Excavation / Trenching
i) First 100 LF $434 $471 CPI
ii) Each Additional 100 LF $72 $79 CPI
m) Sidewalk
i) Up to 20 Lineal Feet $108 $118 CPI
ii) 20 - 100 Lineal Feet $145 $157 CPI
iii) Each Additional 100 Lineal Feet $145 $157 CPI
n) Night Work (per night) $1,172 $1,274 CPI
o) Excess Inspection / Missed Inspection / Re-Inspection / Re-Call Compliance Inspections
$146 $159 per hour CPI
p) Stop Work Notice Release $439 $478 CPI
47

Page 113 of 136 ends

12.D

Page 275 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 19 Research/Administrative
a) Subdivision Improvement Agreement (SIA) $1,734 $1,885 CPI b) SIA - Time Extension $1,012 $1,100 CPI
c) Assignment & Assumptions Agreement $1,879 $2,042 CPI d) Flood Plain
i) Research/FEMA App $434 $471 CPI
ii) Community Acknowledgement Form $217 $236 CPI
e) Bid Protest Review $1,156 $1,257 CPI
f) Misc Research (per request, per hour) $145 $157 CPI [k] g) Misc Covenant Review & Approval $361 $393 CPI
h) CC&R Review (per request) $2,312 $2,513 CPI
i) Streetlight Application Review and Covenant $361 $393 CPI 20 Reactivation of Permit
a) Reactivation of an Expired Minor Permit $145 $157 CPI [l] b) Reactivation of an Expired Major Permit $289 $314 CPI [l] 21 Technology Enhancement Fee (percent of permit fee) 5% 5% n/a 22 Transportation Permits
a) Annual $90 $90 n/a
b) Single Event $16 $16 n/a
23 Plan Review - Water and Sewer
a) Residential Tract - per 500 LF Water $99 $107 CPI
b) Residential Tract - per 500 LF Sewer $99 $107 CPI
24 Fees for Services Not Listed in this Fee Schedule $198 $215 per person; per hr. CPI 48

Page 114 of 136 ends

12.D

Page 276 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - ENGINEERING FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note [a] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload. [b] Deposit amount may be adjusted based on consultant estimate. [c] For PM10 annual permit.
[d] Fee generally assumes one inspection per month. Additional inspections billed using re-inspection fee. [e] Includes, curb, gutter, and sidewalk. Excludes driveways. [f] Rounded up to nearest thousand feet.
[g] Footage based on centerline street length.
[h] Includes tract single family homes, does not include tract final. [i] Includes tract finals.
[j] Permanent patching of pavement at same location will count as a subsequesnt consecutive day. [k] Estimate provided up front.
[l] Assumes no changes to original permit.
49

Page 115 of 136 ends

12.D

Page 277 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PUBLIC WORKS - PUBLIC WATER UTILITY SERVICES FEES Current Fee Proposed Fee Adjustment Note
1 Utility account set up $38 $42 CPI 2 Shut Off Notice
a) First Unit $50 $50 n/a
b) Each Additional Unit $10 $11 CPI
3 Delinquent Shut-Off/Reconnect
a) Low Income
i) During normal work hours $50 $54 CPI
ii) After normal work hours $125 $136 CPI
b) All Others
i) During normal hours (Before 3pm) $75 $82 CPI
ii) After normal hours (After 3pm) $230 $250 CPI
4 Non-Sufficient Funds/Returned Check Fee
a) First $25 $25 n/a [a]
b) Each Additional $35 $35 n/a [a]
5 Temporary Construction Water Meter
a) Temporary Construction Water Meter $137, plus cost of water; $1,200 deposit for meter and water
$141, plus cost of water; $1,200
deposit for meter and water
CPI
b) Temporary Construction Water Meter and Backflow device with test $222, plus cost of water; $2,200 deposit for meter and water
$228, plus cost of water; $2,200
deposit for meter and water
CPI
c) Temporary Construction Meter Relocation $79 $86 CPI
d) Temporary Construction Meter and backflow Device with Test Relocation $222 $241 CPI Activity Description
50

Page 116 of 136 ends

12.D

Page 278 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PUBLIC WORKS - PUBLIC WATER UTILITY SERVICES FEES Activity Description Current Fee Proposed Fee Adjustment Note 6 Temporary Service $56 $61 CPI 7 Water Turn-On/Turn-Off by Customer Request - Out of Schedule a) During normal work hours (Before 3pm) $50 $54 CPI
b) After normal work hours (After 3pm) $125 $136 CPI
8 Illegal Reconnect
a) Broken Lock $100 $109 CPI
b) Removal of Meter w/ plug $100 $109 CPI
c) Removal of Jumper $100 $109 CPI
9 Meter Purchase
a) 5/8" x 3/4" Actual Cost Actual Cost n/a
b) 1" Actual Cost Actual Cost n/a
c) 2" Actual Cost Actual Cost n/a
d) Larger than 2" Actual Cost Actual Cost n/a
10 Backflow Testing Program - Annual Fees
a) Backflow device inspection (new/replaced) $127 $138 CPI b) Backflow Inspection and Test $206 $224 CPI
c) Backflow non-compliance test $270 $293 CPI
d) Backflow non-compliance shut-off $254 $276 CPI
11 Fire Flow Testing for New Fire Services $159 $172 CPI 51

Page 117 of 136 ends

12.D

Page 279 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PUBLIC WORKS - PUBLIC WATER UTILITY SERVICES FEES Activity Description Current Fee Proposed Fee Adjustment Note 12 Meter Testing
a) 5/8" to 1" $106 $115 CPI
b) 1.5" or 2" $138 $150 CPI
c) Larger than 2" $138 $150 CPI
13 Collection Agency Processing $50 $50 n/a
14 Dye Test $169 $184 CPI
15 Utility Connections (Water & Sewer)
a) Plan Review $359 $391 CPI
b) Inspection $346 $376 CPI
16 Fees for Services Not Listed in this Fee Schedule
a) Maint Worker II $104 $113 CPI [b]
b) Water/Fin. - Cust Serv Rep $115 $125 CPI [b]
c) Water Quality/ conservat. $130 $141 CPI [b]
d) Backflow Cross-Connection $127 $138 CPI [b]
e) Water Customer Service Field $109 $118 CPI [b]
[a] California Civil Code Section 1719.
[b] Per person, per hour.
52

Page 118 of 136 ends

12.D

Page 280 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PUBLIC WORKS - MAINTENANCE FEES Current Fee Proposed Fee Adjustment Note
1 Banner Installation and Removal
a) Banner (Across Street) $237 $258 CPI [a]
b) Pennants/Flag Banners (per pole) $201 $218 CPI [b]
2 Graffiti Removal
a) Up to 250 SF $185 $201 CPI
b) Each Additional 100 SF $21 $23 CPI
3 Response and cleanup of sewer spills, spills affecting the storm drains, nuisance abatement, etc.

Actual Cost Actual Cost n/a [c]
4 NPDES Ongoing Inspection Fee
a) Industrial
i) High Priority $264 $287 CPI [d]
ii) Medium Priority $264 $287 CPI [d]
b) Commercial
i) High Priority $217 $236 CPI [d]
ii) Medium Priority $217 $236 CPI [d]
iii) Low Priority $185 $201 CPI [d]
c) Restaurant
i) High Priority $217 $236 CPI [d]
ii) Medium Priority $217 $236 CPI [d]
iii) Low Priority $185 $201 CPI [d]
d) Construction Activities Inspection
e) Re-inspections $185 $201 CPI [d]
f) Post Construction BMPs $296 $322 CPI [d]
5 Self Haul Permit new $298 CPI 6 NPDES Construction Activities Inspection new $110 CPI 7 Equipment Supplied by City See FEMA rate schedule See Caltrans rate schedule n/a [e] 8 Fees for Services Not Listed in this Fee Schedule $120 $131 CPI [f] Activity Description
53

Page 119 of 136 ends

12.D

Page 281 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - PUBLIC WORKS - MAINTENANCE FEES Activity Description Current Fee Proposed Fee Adjustment Note [a] Banner to be provided to City by fee payer.
[b] Fee amount per pole includes cost of materials.
[c] Actual cost including materials, equipment, and labor time billed at fully-burdened hourly rates. [d] Per inspection.
[e] fema.gov/assistance/public/schedule-equipment-rates [f] Billed at fully-burdened hourly rate of staff providing services. 54

Page 120 of 136 ends

12.D

Page 282 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - POLICE FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
1 DUI Accident Investigation direct costs +
staff FBHR
direct costs +
staff FBHR
fbhr + testing costs n/a
2 Crime Scene Photo Reproduction (digital only, no paper reproduction) $37 $37 n/a [a] 3 Concealed Weapons Investigation $52 $52 plus vendor costs n/a [a] 4 False 911 calls $100 $100 n/a 5 Civil Subpoenas Maximum Allowed by Law
Maximum Allowed by
Law
per hour; per person; per mile n/a
6 Massage Establishment Inspection $200 $200 n/a 7 Firearms Dealers $40 $40 n/a 8 Photographs (Digital Media) $29 $29 n/a [a] 9 Citation Sign-Off (Non Hemet PD citation) $26 $26 n/a 10 Duplicate Citations $6 $6 n/a
11 Massage Technician/Establishment Hearing $365 $365 n/a 12 Gun Storage Admin Fee $50 $50 n/a
13 Storage of Vendor Equipment or Products $50 $50 n/a
14 Police Report - Non-Collision Report $10 $10 n/a [b] 15 Police Report - Call for Service $5 $5 n/a [a]
16 Police Report - Traffic Collision w / injury $32 $32 n/a [a] 17 Police Report - Traffic Collision without injury $15 $15 n/a [a] 18 Agency Live-scan fee $35 $35 n/a [a]
19 Subpoena Fee
a) Clerical Retrieval $24 $24 per hour n/a [c]
b) Copies up to 8.5 x 14 $0.10 $0.10 per page n/a [c]
20 Bicycle License $8 $8 for 3 years n/a [a]
Activity Description
55

Page 121 of 136 ends

12.D

Page 283 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - POLICE FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Note 21 Repossession Fee $15 $15 n/a [a]
22 VIN Verification $40 $40 n/a [a]
23 Vehicle Impound Fee $200 $200 n/a [d]
24 Statistical Report (per location) $10 $10 n/a [a]
25 Clearance Letter $35 $35 n/a [a]
26 Witness Fee (Civil) $291 $275 per person; per day n/a [e] 27 HPD Inspection/Admin Processing - Ice Cream / Food Truck Vendors $80 $80 per cart / vehicle
n/a [f]
28 2nd Hand Dealer / Pawn Broker - HPD Clerical/Admin DOJ License Processing Recovery
$60 $60 per license n/a [f]
29 Fees for Services Not Listed in this Fee Schedule Varies Varies per person; per hour
n/a [g]
[a] Per Resolution 3891.
[b] Per California Governement Code 6253(b).
[c] Per California Evidence Code Section 1563.
[d] Per California Vehicle Code 22850.5.
[e] Per Government Code 68097.2
[f] Does not include business license fees.
[g] Billed at fully-burdened hourly rate of staff providing services. 56

Page 122 of 136 ends

12.D

Page 284 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - CODE ENFORCEMENT FEES
Current Fee Proposed Fee Charge Basis Adjustment Note
1 Foreclosure
a) Registration $386 $420 CPI
b) Foreclosure Re-registration $148 $161 CPI
2 Garage Sale Permit $20 $20 n/a 3 Abandoned Vehicle Removal $127 $138 CPI 4 Code Enforcement Inspection (per hour) $144 $156 per hour CPI Activity Description
57

Page 123 of 136 ends

12.D

Page 285 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - FINANCE
Current Fee Proposed Fee Charge Basis Adjustment Note
1 Non-Sufficient Funds Processing
a) First $25 $25 Each n/a [a]
b) Each Additional $35 $35 Each n/a [a]
2 Copy or Replacement of Business License n/a $5 Each n/a [a] California Civil Code Section 1719.

Activity Description
58

Page 124 of 136 ends

12.D

Page 286 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - CITY CLERK
Current Fee Proposed Fee Charge Basis Adjustment Note
1 Copying and Printing Service
a) Documents 8.5" x 14" or less (per single-sided page) $0.10 $0.10 per page n/a b) Oversize Documents Actual Cost Actual Cost n/a
2 Digital Media Fee $10 $10 n/a [a] 3 Research Service $24 $24 per hour n/a 4 Minute/Agenda Mailing Service a) With Stamped Envelopes Provided by Requestor $88 $88 n/a b) Without Stamped Envelope Provided by Requestor $112 $112 n/a 5 Subpoena Document Preparation and Witness Fees Maximum Allowed by Law
Maximum Allowed by
Law
per hour, per mile, per person n/a
6 Fee for Services Not Otherwise Specified $93 $101 per hour CPI [a] Applies when digital media device provided by City.

Activity Description
59

Page 125 of 136 ends

12.D

Page 287 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - LIBRARY
Current Fee Proposed Fee Charge Basis Adjustment Note
1 Late fees for all materials $0.50 $0.50 Per day n/a 2 Maximum late fees for all material $10 $10 Per item n/a 3 Replacement fees $10 processing fee plus cost of materials
$10 processing fee
plus cost of materials
Per item n/a
4 Copies and printing
a) Black and white $0.15 $0.15 Per page n/a
b) Color $0.35 $0.35 Per page n/a
5 Public fax - National
a) First page $1.75 $1.75 Per page n/a
b) Each Add'l page $1.00 $1.00 Per page n/a
6 Public fax - International
a) First page $3.95 $3.95 Per page n/a
b) Each Add'l page $3.45 $3.45 Per page n/a
7 Collection agency fees $15 $15 Per Account n/a 8 Replacement Card $3 $3 n/a 9 Visitors Card $5 $5 n/a 10 Buying Computer Time (additional time) $8 $8 Per hour n/a 11 Study Room $5 $5 Per Hour n/a
12 Passport processing $35 $35 Set by Dept of State n/a Activity Description
60

Page 126 of 136 ends

12.D

Page 288 of 1938 ends

City of Hemet

CURRENT - SCHEDULE OF FACILITY RENTAL RATES AND CHARGES Reservation Fee Facility Setup /
Teardown Fee
Facility
Attendant Fee
Cleaning / Damage
Deposit
Adjsutment Note
1 Conference Room Rental $55 for up to 3 hours;
$25 each additional hour
No Charge No Charge n/a n/a [a]
2 Hall Rental $525 for up to 3 hours;
$125 each additional hour
$150 per rental $35 per hour $500 per rental n/a [a]
3 Kitchen Use Fee
(in addition to base rental fee)
$25 per hour n/a
4 Dance Floor Use Fee
(in addition to base rental fee)
$300 flat fee per use n/a
5 Patio Use Fee
(in addition to base rental fee)
$75 per hour n/a
[a] The City reserves the right to collect additional amounts to cover all costs of cleaning, repair, and damage.

Activity Description
61

Page 127 of 136 ends

12.D

Page 289 of 1938 ends

City of Hemet

PROPOSED - SCHEDULE OF FACILITY RENTAL RATES AND CHARGES Reservation Fee Facility Setup /
Teardown Fee
Facility
Attendant Fee
Cleaning / Damage
Deposit
Adjsutment Note
1 Conference Room Rental $55 for up to 3 hours;
$25 each additional hour
No Charge No Charge n/a n/a [a]
2 Hall Rental $525 for up to 3 hours;
$125 each additional hour
$150 per rental $38 per hour $500 per rental n/a [a] [b] 3 Kitchen Use Fee
(in addition to base rental fee)
$25 per hour n/a
4 Dance Floor Use Fee
(in addition to base rental fee)
$300 flat fee per use n/a
5 Patio Use Fee
(in addition to base rental fee)
$75 per hour n/a
[a] The City reserves the right to collect additional amounts to cover all costs of cleaning, repair, and damage. [b] Rental times include your setup and tear down.

Activity Description
62

Page 128 of 136 ends

12.D

Page 290 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE FEES
Current Fee Proposed Fee Charge Basis Adjustment Code
1 Adult Businesses refer to Planning first refer to Planning first n/a Sec. 18-351 2 Advertising billboards $154.00 $154.00 per board face n/a Sec. 18-61 3 Amusement, recreation, entertainment Sec. 18-61 (a) any coin operated game $44.00 $44.00 n/a
i) Plus fee per coin operated game $5.00 $5.00 n/a
(b) spectator events $19.00 $19.00 n/a
i) Plus fee per concession $5.00 $5.00 n/a
4 Billiards $44.00 $44.00 n/a Sec. 18-61
a) Plus Fee per table $5.00 $5.00 n/a
5 Bingo $44.00 $44.00 n/a Sec. 18-121 6 Booth Rental $29.00 $29.00 n/a 7 Bowling Alley $104.00 $104.00 plus employees n/a Sec. 18-61 a) Plus fee per alley in excess of 3 alleys $12.00 $12.00 n/a 8 Carnival / Circus / Fair Sec. 18-61
(a) 1st Day $204.00 $204.00 n/a
(b) Each Succeeding Day $100.00 $100.00 n/a
9 Child Care Sec. 18-59
(a) 6 or less not required not required n/a
(b) 7 or more $44.00 $44.00 n/a
10 Contractor Sec. 18-60
(a) General - A or B
(i) per year, or $84.00 $84.00 n/a
(ii) 1 Job Only $44.00 $44.00 n/a
(b) Sub - C
(i) per year, or $64.00 $64.00 n/a
(ii) 1 Job Only $34.00 $34.00 n/a
Activity Description
63

Page 129 of 136 ends

12.D

Page 291 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Code 11 Delivery Vehicles based on gross vehicle
weight
based on gross vehicle
weight
n/a Sec. 19-54
12 Farmer's Market Sec. 18-61
(a) Per Day $19.00 $19.00 n/a
(b) Plus fee per concession $6.00 $6.00 n/a
13 Gardener $44.00 $44.00 n/a Sec. 18-61
14 Gas Station $64.00 $64.00 plus employees n/a Sec. 18-61 15 Handyman $44.00 $44.00 n/a Sec. 18-61
16 Handbills, advertising samples $254.00 $254.00 n/a Sec. 18-61 (a) Plus per person $25.00 $25.00 n/a
(b) Plus per day $25.00 $25.00 n/a
17 Ice Cream Truck $104.00 $104.00 per vehicle n/a Sec. 18-62 18 Massage $44.00 $44.00 plus clearance from the Police Dept.
n/a Sec. 18-211
19 Motion Picture refer to
Planning first
refer to
Planning first
n/a Sec. 18-181
20 Nursing Homes Sec. 18-450
(a) 6 or less not required not required n/a
(b) 7 or more $44.00 $44.00 n/a
21 Property Rental Sec. 18-56
(a) For 3 units $44.00 $44.00 n/a
(b) per each additional over 3 $1.00 $1.00 n/a
22 Service - Retail $44.00 $44.00 plus employees n/a Sec. 18-57 23 Secondhand Dealers $154.00 $154.00 n/a Sec. 18-61
24 Solicitors Sec. 18-61
(a) For 6 Months $104.00 $104.00 n/a
(b) Per Day $10.00 $10.00 n/a
64

Page 130 of 136 ends

12.D

Page 292 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Code 25 Shoeshine Stand $14.00 $14.00 n/a Sec. 18-61
26 Shooting Gallery $104.00 $104.00 plus employees n/a Sec. 18-61 27 Social Club $104.00 $104.00 n/a Sec. 18-61
28 Tobacco Retailers refer to
Planning first
refer to
Planning first
n/a Sec. 18-410
29 Taxi $44.00 $44.00 plus clearance from the Police
Dept.
n/a Sec. 18-52
30 Theatre $54.00 $54.00 n/a Sec. 18-61
a) Plus fee per seat for 1st 500 seats $0.10 $0.10 n/a
b) Plus fee per seat over 500 seats $0.05 $0.05 n/a
31 Temporary Events Sec. 18-61
(a) Per day $19.00 $19.00 n/a
(b) Plus fee per concession $5.00 $5.00 n/a
32 Vending - Food Vehicle $104.00 $104.00 n/a Sec. 18-61 33 Vending - Laundry based on gross receipts based on gross receipts n/a Sec. 18-59 34 Vending - Machine (Intangible) based on gross receipts based on gross receipts n/a Sec. 18-55 35 Vending - Machine (Tangible) based on gross receipts based on gross receipts n/a Sec. 18-55

Page 131 of 136 ends

12.D

Page 293 of 1938 ends

City of Hemet

BEFORE AND AFTER ILLUSTRATION - BUSINESS LICENSE FEES
Activity Description Current Fee Proposed Fee Charge Basis Adjustment Code Fee for Employees (based on Full Time Equivalent)
NOT APPLICABLE TO CONTRACTORS OR "SPECIAL" TYPE
BUSINESS LISTED IN SEC 18-61
36 1-2 $10.00 $10.00 n/a
37 3-6 $30.00 $30.00 n/a
38 7-10 $50.00 $50.00 n/a
39 11-14 $70.00 $70.00 n/a
40 15-20 $100.00 $100.00 n/a
41 21-30 $120.00 $120.00 n/a
42 31-40 $150.00 $150.00 n/a
43 41-50 $200.00 $200.00 n/a
44 51+ $200.00 $200.00 n/a
1 full time employee = 1 full time equivalent
3 part-time employees = 1 full time equivalent
* No license required for those under 18 years of age or 65 years of age with gross income from business < $600.00 ** Fees listed include SB1186 tax of $4

Page 132 of 136 ends

12.D

Page 294 of 1938 ends

City of Hemet
User and Regulatory Fee Study
Cost of Service Calculation - Building
Time Est.

Hourly
Rate Cost of Svc Current Fee
Current
Cost Rec. Proposed Fee
Proposed
Cost Rec.

Charge
Basis
Note
Fence Building Permit
11 Fence - Residential (Plan Review) 1.00 $184 $184 n/a n/a $184 100% 11 Fence - Residential (Inspection) 1.25 $184 $230 $138 n/a $230 100% Permit Processing and Other Fees
12 For each water softener 0.12 $184 $21 n/a n/a $21 100% Plumbing Permit Fees
24 Special Inspector Registration 0.50 $184 $92 n/a n/a $92 100% Swimming Pool and Spa - Residential
38 Swimming Pool Residential (Plan Review) 1.00 $184 $184 n/a n/a $184 100% Activity Description
1

Page 133 of 136 ends

12.D

Page 295 of 1938 ends

City of City of Hemet
User and Regulatory Fee Study
Cost of Service Calculation - Fire Prevention Fees
Fee Description
Estimated
Labor Hours
Estimated
Cost Current Fee
Current Cost
Recovery
Proposed
Fee
Proposed
Cost
Recovery Unit Notes

OTHER MISCELLANEOUS FEES
13 Educational Facilities
a) 1 - 250 Students 1.00 $184 n/a n/a $184 100%
b) 251 - 500 Students 2.00 $368 n/a n/a $368 100%
c) > 500 Students 4.00 $736 n/a n/a $736 100%
39 Multi-Family 3+ Units Fire Permit
b) Each building over 10 0.17 $31 n/a n/a $20 65%

OPERATIONAL PERMITS
48 Operational Permits
a) Initial Permit 1.00 $184 n/a n/a $184 100%
b) Each Additional Permit 0.25 $46 n/a n/a $46 100%
2

Page 134 of 136 ends

12.D

Page 296 of 1938 ends

City of Hemet
User and Regulatory Fee Study
Cost of Service Calculation - Engineering
Fee Description
Est. Eng Dept
Labor Hrs
FullyBurdened
Hourly Rate
Cost of
Service Current Fee
Current Cost
Recovery
Proposed
Cost
Recovery
Proposed
Fee
Proposed
Fee Structure Note
Grading / Project Improvements
7 Plan Review (First 3 Reviews):
s) Sewer and Water - Onsite or Offsite
i) Initial Sheet 5.00 $215 $1,075 198.00 18% 100% $1,075 ii) Each Additional Sheet 2.00 $215 $430 99.00 23% 100% $430 10 Offsite Landscape Review Fee
a) Initial Sheet 9.00 $215 $1,935 n/a n/a 100% $1,935
b) Each Additional Sheet 4.00 $215 $860 n/a n/a 100% $860 c) Revisions - Initial Sheet 0.50 $215 $107 n/a n/a 100% $107 d) Revisions - Each Additional Sheet 0.50 $215 $107 n/a n/a 100% $107 11 Street Light Review Fee
a) Initial Sheet 8.00 $215 $1,720 n/a n/a 100% $1,720
b) Each Additional Sheet 4.00 $215 $860 n/a n/a 100% $860 c) Revisions - Initial Sheet 0.50 $215 $107 n/a n/a 100% $107 d) Revisions - Each Additional Sheet 0.50 $215 $107 n/a n/a 100% $107 12 Building Submittal Review Fee 1.00 $215 $215 n/a n/a 100% $215 per hour 3

Page 135 of 136 ends

12.D

Page 297 of 1938 ends

City of Hemet
User and Regulatory Fee Study
Cost of Service Calculation - Public Works - Maintenance $110 $149
Fee Description PW Maint PW Admin Total
M'tls /
Contract
Svc
Est. Cost of
Service Current Fee
Current Cost
Recovery
Targeted Cost
Recovery Proposed Fee Note
1 Self Haul Permit 2.00 2.00 $298 n/a 100% $298 [a] 2 NPDES Construction Activities Inspection 1.00 $110 n/a 100% $110 Hourly Rate
4

Page 136 of 136 ends

12.D

Page 298 of 1938 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 27 2023
Department: Administration
Submitted by: Mark Prestwich, City Manager
John Maier, City Clerk;
☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:

Approval of the Regular City Council Meeting Minutes of June 13, 2023 RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Approve the Regular City Council Meeting Minutes of June 13, 2023.

STRATEGIC PLAN INTEGRATION:

N/A
ATTACHMENT(S):

City Council Meeting - Jun 13 2023 - Minutes (004)

Page 1 of 13 ends

13.A

Page 299 of 1938 ends

DRAFT MINUTES
City Council Meeting
City of Hemet
City Council Chamber
Tuesday, June 13, 2023

1. WORK STUDY SESSION - 6:30 P.M.

2. CALL TO ORDER

3. ROLL CALL
City Clerk Maier provided the Roll Call as follows:

Present: Mayor Males
Mayor Pro Tem Lilienthal
Council Members Krupa and Peterson
Staff Present:

City Manager:

City Attorney:

City Clerk:

Prestwich
Graham
Maier

4. PUBLIC COMMENT PERIOD - RULES OF DECORUM, RESOLUTION NO. 4545
Mayor Males asked for public comments, no one spoke.

5. WORK STUDY ITEM

5.A Discussion of Possible Car Wash Facility Moratorium Action:

The City Council received a report on consideration of a potential car wash facility moratorium and zoning code update and directed staff to

Page 2 of 13 ends

13.A

Page 300 of 1938 ends

provide a report on the Car Wash Facility Moratorium and Zoning Code Update.

6. ADJOURNMENT OF WORK STUDY SESSION
Mayor Males adjourned at 6:47 p.m.

REGULAR MEETING - 7:00 P.M.

7. CALL TO ORDER
The City Council of the City of Hemet met this date in a Regular Session at 7:00 p.m. in the City Council Chamber, 450 E. Latham Avenue, Hemet, California with Mayor Males presiding.

8. ROLL CALL
City Clerk Maier provided the Roll Call as follows:

Present: Mayor Males
Mayor Pro Tem Lilienthal
Council Member Krupa
Council Member Peterson

Absent:

Staff Present: City Manager Prestwich
City Attorney Graham
City Clerk Maier

9. INVOCATION
Invocation was given by Pastor Dale Garland.

10. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Council Member Krupa.

11. COMMUNICATIONS FROM THE PUBLIC
Mayor Males asked for Public Comments, the following citizen spoke:

Chris Engel, Robert Betancourt Jr., Gail Wesson, and Pat Gregory.

11.A Public Comment for Items Listed on the Agenda: Consent and Discussion Items

11.B Public Comment for Items Not Listed on the Agenda, but within Jurisdictional Matter

12. PRESENTATIONS

12.A Juneteenth Independence Day Proclamation

Page 3 of 13 ends

13.A

Page 301 of 1938 ends

Mayor Pro Tem Lilienthal presented the proclamation to George Sykes Jr. and Anita Sykes.

12.B National Month of Prayer Proclamation
Mayor Males presented the proclamation to the pastors of Hemet.

Page 4 of 13 ends

13.A

Page 302 of 1938 ends

12.C Certificate of Appreciation - Adopt-A-Street Program Council Member Peterson presented the Certificate of Appreciation to Girl Scout Troop 95 representatives.

Council Member Krupa presented the Certificate of Appreciation to a representative of the Hemet Valley Recovery Center Alumni.

13. RECEIVE AND FILE

13.A The City of Hemet Warrant Registers Dated April 20, 2023, in the amount of $1,962,804.38, May 4, 2023, in the amount of
$1,311,680.46 and May 18, 2023, in the amount of $2,734,676.45.

The Payroll Periods of April 3, 2023 – April 16, 2023, in the amount of $831,792.40, April 17, 2023 – April 30, 2023, in the amount of $878,587.30 and May 1, 2023 – May 14, 2023, in the amount of $824,109.42
Action:

The City Council received and filed the City of Hemet Warrant Registers.

13.B Investment Reports for February, March, and April 2023 Action:

The City Council received and filed the Investment Reports for February, March, and April 2023.

14. PUBLIC HEARINGS

14.A Public Hearing to Consider Establishing City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing), to Establish an Appropriations Limit, Therefore, to Authorize the Submittal of the Levy of Special Taxes, to Submit the Establishment of an Appropriations Limit to the Qualified Electors of Such Community Facilities District; Calling a Special Election and Submitting to the Qualified Electors of City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) Propositions Regarding the Establishment of an Appropriations Limit and the Annual Levy of a Special Tax Within the Community Facilities District; and, Declaring the Results of a Special Election in City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) and Directing the Recording of a Notice of Special Tax Lien, Generally located between Stetson Avenue, South Cawston Avenue, West Thornton Avenue, and Warren Road.

Page 5 of 13 ends

13.A

Page 303 of 1938 ends

Action:

Mayor Males opened the Public Hearing.

Mayor Males asked for public comment; no one spoke.

Mayor Males closed the Public Hearing.

City Clerk Maier read the special election results, highlighting that the total votes (49) registered a “Yes” vote.

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to:

1. Adopt a Resolution 2023-086 of the City Council of the City of Hemet, California, to establish City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing), to establish an appropriations limit therefore, to authorize the submittal of the levy of special taxes, and to submit the establishment of an appropriations limit, to the qualified electors of such Community Facilities District; and,

2. Adopt a Resolution 2023-087 of the City Council of the City of Hemet, California, calling a special election and submitting to the qualified electors of City of Hemet Community Facilities District No. 2023- 01 (Morgan Crossing) propositions regarding the
establishment of an appropriations limit and the annual levy of a special tax within the Community Facilities District; and

3. Adopt a Resolution 2023-088 of the City Council of the City of Hemet, California, declaring the results of a special election in City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) and directing the recording of a notice of special tax lien; and

4. Waive full reading, read by title only, and introduce an Ordinance entitled, An Ordinance of the City Council of the City of Hemet, California, acting in its capacity as the legislative body of City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) authorizing the levy of a special tax therein.

14.B Public Hearing to Consider Authorizing the Annexation of Territory to Community Facilities District No. 2005-1 (Public Safety Services) as Annexation No. 22 and Authorizing the Submittal of the Levy of Special Taxes to the Qualified Electors of Such Community Facility District; Calling a Special Election and Submitting to the Qualified Electors of Community Facilities District No. 2005-1 (Public Safety Services) Propositions Regarding the Establishment of an Appropriations Limit and the Annual Levy of a Special Tax Within the Community Facilities District; Making Certain Findings, Certifying the Results of an Election, and Adding Property to Community Facilities

Page 6 of 13 ends

13.A

Page 304 of 1938 ends

District No. 2005-1 (Public Safety Services), the Annexed Territory, Generally Located Between Stetson Avenue, South Cawston Avenue, West Thornton Avenue, and Warren Road.

Action:

Mayor Males opened the Public Hearing.

Mayor Males asked for public comment; no one spoke.

Mayor Males closed the Public Hearing.

City Clerk Maier read the special election results, highlighting that the total votes (49) registered a “Yes” vote.

MOTION BY COUNCIL MEMBER PETERSON, SECOND BY MAYOR
PRO TEM LILIENTHAL, CARRIED 4-0, to:

1. Adopt a Resolution 2023-089 of the City Council of the City of Hemet, California, Authorizing Annexation of Territory to Community Facilities District No. 2005-01 (Public Safety Services) as Annexation No. 22 and Authorizing the Submittal of the Levy of Special Taxes to the Qualified Electors of such Community Facilities District; and,

2. Adopt a Resolution 2023-090 of the City Council of the City of Hemet, California, calling a special election and submitting to the Qualified Electors of City of Hemet Community Facilities District No. 2005- 01 (Public Safety Services) Propositions Regarding the Establishment of an Appropriations Limit and the Annual Levy of a Special Tax within the Community Facilities District; and

3. Adopt a Resolution 2023-091 of the City Council of the City of Hemet, California, Making Certain Findings, Certifying the Results of an Election and Adding Property to Community Facilities District No. 2005-01 (Public Safety Services).

15. CONSENT CALENDAR

MOTION BY MAYOR PRO TEM LILIENTHAL, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to approve the Consent Calendar, with the removal of Items 15 C, D, G, and H for separate consideration.

15.A Approval of the Regular City Council Meeting Minutes of May 23, 2023, Special City Council Meeting Minutes of May 24, and Special City Council Meeting Minutes of June 2, 2023
Action:

MOTION BY MAYOR PRO TEM LILIENTHAL, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to approve the Regular City Council Meeting Minutes of May 23, 2023, Special City Council Meeting

Page 7 of 13 ends

13.A

Page 305 of 1938 ends

Minutes of May 24, and Special City Council Meeting Minutes of June 2, 2023.

15.B Second Reading and Adoption of Ordinance 2012, An Ordinance of the City Council of the City of Hemet, California, Adding Article VI "Electronic And Paperless Filing of Fair Political Practices Commission Campaign Disclosure Statements and Statements of Economic Interests" to Chapter 2 "Administration" of the Hemet Municipal Code Action:

MOTION BY MAYOR PRO TEM LILIENTHAL, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to waive full reading and adopt Ordinance 2012, an Ordinance of the City Council of the City of Hemet, California, adding Article VI "Electronic And Paperless Filing of Fair Political Practices Commission Campaign Disclosure Statements and Statements of Economic Interests" to Chapter 2 "Administration" of the Hemet Municipal Code.

15.C A Resolution of the City Council of the City of Hemet, Approving Reinstatement and Second Amendment for Services between the City of Hemet and Kimley-Horn and Associates, Inc. to allow an additional $22,500 for a Contract not to Exceed the Amount of $213,635 and to Execute Reinstatement Agreement to Extend the Term of the Agreement until December 1, 2023 to complete the 6th Cycle Housing Element Update (2021-2029), Addendum to the City's General Plan Safety Element, and Addition of New Environmental Justice Element.

Action:

MOTION BY MAYOR MALES, SECOND BY MAYOR PRO TEM
LILIENTHAL, CARRIED 4-0, to Adopt a Resolution 2023-092 approving Reinstatement and Second Amendment for Services between the City of Hemet and Kimley-Horn and Associates, Inc. to allow an additional $22,500 for a Contract not to Exceed the Amount of $213,635 and to Execute a Reinstatement Agreement to Extend the Term of the Agreement until December 1, 2023, to complete the 6th Cycle Housing Element Update (2021-2029), Addendum to the City's General Plan Safety Element, and Addition of New Environmental Justice Element.

15.D A Resolution of the City Council of the City of Hemet, California, Approving the Three Year Agreement for Services between the City of Hemet and the 9th Shield Incorporated in the amount of $267,960 and Authorizing the City Manager to Approve all documents related to the Agreement

Page 8 of 13 ends

13.A

Page 306 of 1938 ends

Action:

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY MAYOR PRO
TEM LILIENTHAL, CARRIED 4-0, to continue the item, and to direct staff to provide additional information, including request from 9th Shield a quote for armed services and night security services.

15.E A Resolution of the City Council of the City of Hemet, California, Authorizing the City Manager to Execute Amendment No. 1 in the amount of $234,571 to the City of Hemet Agreement with SirsiDynix for Proprietary Library Automation Services for an Additional Seven Year Term.

Action:

MOTION BY MAYOR PRO TEM LILIENTHAL, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to adopt a Resolution 2023- 094 of the City Council of the City of Hemet, California, Authorizing the City Manager to Execute Amendment No. 1 to the City of Hemet Agreement with SirsiDynix for Proprietary Library Automation Services for an Additional Seven Year Term.

15.F California Fire Foundation Wildland Personal Protection Equipment Grant
Action:

MOTION BY MAYOR PRO TEM LILIENTHAL, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to adopt a Resolution 2023-095 of the City Council of the City of Hemet, California, Accepting the 2023 Wildland Personal Protection Equipment Grant from California Fire Foundation for (64) Wildland Battle Dress Uniforms in the Amount of $10,000.00 and Authorizing the Finance Director to Appropriate Funds for the Purchase of sixty-four (64) Wildland Battle Dress Uniforms.

15.G An Annual Review and Approval of the Annual Report for the Hemet Police Department's Specialized Equipment Use Policy, Per Ordinance 1998, Section 38-3
Action:

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to approve the Annual Report for the Hemet Police Department's Specialized Equipment Use Policy, per Ordinance 1998, Section 38-3.

15.H A Resolution of the City Council of the City of Hemet, California,

Page 9 of 13 ends

13.A

Page 307 of 1938 ends

Amending Resolution No. 3944 and the Goals and Policies for the Use of the Mello-Roos Community Facilities Act of 1982
Action:

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY MAYOR PRO
TEM LILIENTHAL, CARRIED 4-0, to adopt a Resolution 2023-096 of the City Council of the City of Hemet, California, Amending the Goals and Policies for the Use of the Mello-Roos Community Facilities Act of 1982.

16. DISCUSSION - ACTION ITEMS

16.A Discussion and Action on City Council District 1 Vacancy Including Potentially Calling a Special Election to Fill the Vacancy or Appointment of a Qualified Individual to Fill the Vacancy City Clerk Maier presented a brief staff report on the Application and Appointment Process for City Council District One.

City Clerk Maier announced that 11 candidates submitted applications and seven candidates were qualified to participate in the interview process:

George “Dick” Clark, Carole Kendrick, Norman Kyriss III, Terry Larned, Deni Antionette Mazingo, Roger Meyer, and George Schaeffer. Mayor Males pulled names from a bucket providing a randomized order for the interview process.

Mayor Males called a recess at 9:59 p.m.

Mayor Males called the meeting back to order at 10:04 p.m.

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to continue the meeting past 10:00 p.m.

City Clerk Maier provided a list of the qualified candidates to the City Council. The City Council provided the City Clerk with two names from each of their lists to determine the top two candidates of their choice for nomination. City Clerk Maier read the results: Carole Kendrick received three nominations, Norman Kyriss III received one nomination, Terry Larned received one nomination, and Roger Meyer received two nominations. Council Members Peterson, Krupa, and Mayor Pro Tem Lilienthal nominated Carole Kendrick.

Action:

MOTION BY COUNCIL MEMBER KRUPA, SECOND BY COUNCIL
MEMBER PETERSON, CARRIED 4-0, to appoint Carole Kendrick to finish the remainder of the unexpired term of the District 1 City Council seat.

Page 10 of 13 ends

13.A

Page 308 of 1938 ends

City Clerk Maier provided Carole Kendrick with the Oath of Office.

17. CITY COUNCIL AND STAFF REPORTS
Mayor Males asked for Council Comments. No reports were provided

COUNCIL MEMBER KRUPA

1. Hemet Housing Authority

2. Investment Oversight Committee

3. Hemet Public Library Board of Trustees

4. Riverside County Airport Land Use Commission *

5. League of California Cities

6. Riverside County Transportation Commission *

7. Riverside Transit Agency

8. Western Riverside County Conservation Authority *

9. Hemet San Jacinto Water Master Board *

10. Planning Commission

COUNCIL MEMBER PETERSON

1. Infrastructure Commission

2. League of California Cities

3. Riverside County Habitat Conservation Agency

4. Western San Jacinto Water Master Board *

5. Ramona Bowl Board of Directors

6. Western Riverside Council of Governments *

7. CAJPIA Board

MAYOR PRO TEM LILIENTHAL

1. Hemet Housing Authority

2. Skate Park Committee

3. Community Action Commission of Riverside County

4. League of California Cities

5. Riverside County Transportation Commission *

6. Riverside Transit Agency *

7. Western Riverside Council of Governments *

Page 11 of 13 ends

13.A

Page 309 of 1938 ends

MAYOR MALES

1. Skate Park Committee

2. League of California Cities

3. Western Riverside Council of Governments *

4. Western Community Energy

5. Planning Commission

AD-HOC COMMITTEE REPORTS

1. Council Protocols Ad-Hoc Committee (Peterson/Krupa)

2. Clean up/Graffiti Ad-Hoc Committee (Lilienthal/Males)

3. Homeless Outreach Ad-Hoc Committee (Lilienthal)

4. Business Outreach Ad-Hoc Committee (Males/Lilienthal)

5. Cal Trans Liaison Ad-Hoc Committee (Peterson/Krupa)

6. CDBG Ad-Hoc Committee (Lilienthal/Males)

7. Banner Program Ad-Hoc Committee (Krupa/Males)

8. Veteran Memorial Ad-Hoc Committee (Males/Peterson)

CITY MANAGER PRESTWICH
City Manager Prestwich announced the bi-weekly City Updates that are posted on the City’s website and Movies in the Park at Mary Henley Park at 7:00 p.m. on June 30th, July 28th, and August 25th.

18. FUTURE AGENDA ITEMS
Mayor Males asked Council if there were any requests for Future Agenda Items; no changes were made. Mayor Males requested for a Closed Session Item to be discussed regarding the County’s advertisement of the proposal of the Mental Health Facility.

1. Broadcasting of City Council Meetings

2. Animal Control Regulations for Businesses

3. Solar Feasibility

4. Traffic Study for the Intersection of Warren Road/Devonshire Avenue

5. American Rescue Plan Act Funding Assessment for Security Services

6. Disability Programs Research and Review by Infrastructure Commission/Staff

19. ADJOURNMENT
There being no further business, Mayor Males adjourned the meeting at 10:45 p.m. The next Regular City Council Meeting will be at 7:00 p.m. on June 27, 2023.

APPROVAL: ATTEST:

Page 12 of 13 ends

13.A

Page 310 of 1938 ends

_______________________________
Joe Males
_____________________________
John P. Maier, MMC
Mayor City Clerk

Page 13 of 13 ends

13.A

Page 311 of 1938 ends
Page 312 of 1938 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 27 2023
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Noah Rau, Public Works Director/City Engineer;
☐ Receive and File ☐ Consent Calendar ☐ Business Item ☒ Public Hearing TITLE:

Second Reading and Adoption of Ordinance 2013, An Ordinance of the City Council of the City of Hemet, California, Acting in its capacity as the Legislative Body of City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing), Authorizing the Levy of a Special Tax Therein RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Waive full reading and adopt Ordinance 2013, an Ordinance entitled, An Ordinance of the City Council of the City of Hemet, California, Acting in its capacity as the Legislative Body of City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing), Authorizing the Levy of a Special Tax Therein.

BACKGROUND:

On May 9, 2023, the City Council took the first step in the process of forming CFD 2023-01 (Morgan Crossing) (“CFD No. 2023-01”). At that time the City Council approved a Resolution of Intention, Resolution No. 2023-076, to form CFD No. 2023-01 and to authorize the levy of a special tax. At that meeting the City Council set June 13, 2023, as the date for this public hearing.

The State Legislature enacted the Mello-Roos Act of 1982 (the “Act”) to assist public agencies in financing certain public services. The developer, Pulte Home Company, LLC, ("Pulte"), and owner Pulte Home Company, LLC, a Michigan limited liability company ("Owner") requested that the City assist them in forming a district in order to cover the costs associated with the maintenance of public improvements within the proposed project area which is projected to include 150 single family residential units, four park parks, two drainage basins and a drainage channel at buildout. The CFD was formed for:
• Conduct street light maintenance including energy charges, operation, maintenance and administrative costs of streetlights within the boundaries of the CFD;

Page 1 of 21 ends

13.B

Page 313 of 1938 ends

• Conduct the maintenance of landscaping, including streetscape, slopes, medians and monuments specifically identified within the CFD;
• Conduct the maintenance of park landscaping and park facilities including play structures and related park facilities specifically identified within the CFD; • Conduct the maintenance, administration and inspections of stormwater facilities and BMPs including water quality basins, channel, modular wetlands, drywells and any other NPDES/WQMP/BMP related devices;
• Conduct litter and graffiti removal on soundwalls and other amenities, plus normal painting as required, within the CFD;
• All other services necessary or useful for, or in connection with, the authorized services listed above, including building a reserve fund for replacement; and • Levy and collect the special tax to fund these services.

The proposed district will be composed of Special Tax A and Special Tax B. Special Tax A provides funding for maintenance of the streetlights, landscaping, detention basins, storm drains, stormwater modular wetlands and drywells, catch basins and graffiti abatement not located in Special Tax Area B.

Special Tax B provides funding for maintenance of the landscaping, monuments, open space, four parks including play structures and park facilities. Maintenance of the Special Tax B improvements shall be the responsibility of the Property Owner’s Association which will enter into a Dormancy Agreement with the City. The Dormancy Agreement states that Special Tax B will not be levied in any year, unless and until, the first year the City determines that the Special Tax B improvements have not been maintained by the Property Owner’s Association to a standard acceptable to the City.

ANALYSIS:

Special Tax Area A will have a Maximum Special Tax of $1,083.00 per dwelling unit for Single Family Residential property, $758.00 per dwelling unit for Condominium Residential Property and $6,814.00 per acre for Multifamily Residential and Non-Residential property. Special Tax Area B will have a Maximum Special Tax of $270.00 per dwelling unit for Single Family Residential property, $189.00 per dwelling unit for Condominium Residential Property and $1,700.00 per acre for Multifamily Residential and Non-Residential property. These rates will increase based on the percentage increase in the Consumer Price Index with a maximum annual increase of 6% and a minimum annual increase of 2% of the Maximum Special Tax in effect in the previous fiscal year.

PREVIOUS COUNCIL ACTION:
• On August 23, 2005, the City Council considered and approved goals and policies concerning Community Facility Districts.
• On May 9, 2023, the City Council adopted Resolution 2023-076, Resolution of Intention (ROI) to establish City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 1: Enhance the visual appearance of the community to make it attractive and reduce blight.

Page 2 of 21 ends

13.B

Page 314 of 1938 ends

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

FISCAL IMPACT:

There is no impact to the General Fund with this action. The individual property owners are responsible for the annual payments of special taxes. The City will work with the County concerning the filing of the annual special tax to the County Auditor-Controller.

The property owners have filed a petition representing their willingness to move forward and have submitted a deposit to pay for City costs incurred in connection with the formation of CFD No. 2023-

01. After CFD No. 2023-01is formed, a special tax lien will be recorded on the property within CFD No. 2023-01and the individual property owners shall be responsible for the annual payments of special taxes. The City will file the annual special tax to be collected with the County Auditor-Controller for placement on the property tax bills. The City’s cost to administer CFD No. 2023-01 annually will be reimbursed through the special taxes charged to property owners. The revenue from the annual special tax will be deposited into a fund for CFD No. 2023-01 and will be used to pay said administrative expenses and for the maintenance services listed above. Both the revenue and expenses will be part of the City’s FY 2023-2024 Adopted Budget.

ALTERNATIVE(S):

1. Do not adopt the Resolution of Formation (ROF) or other resolutions associated with this Public Hearing for City of Hemet Community Facilities District No. 2023-01.

2. Provide alternate directions to staff.

REVIEWED BY LEGAL:
☒ Staff report ☒ Resolution
☒ Ordinance ☐ Agreement
ATTACHMENT(S):

Attachment 5_Ordinance Authorizing Levy of Special Tax_CFD 2023-01_MorganCrossing R1 Attachment 6 - Morgan Crossing CFD 2023-01 RMA
Attachment 7 - Maintenance-Responsibilty Exhibit-04-13-23 FINAL

Page 3 of 21 ends

13.B

Page 315 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Ordinance No. XXX
-1-

CITY OF HEMET
Hemet, California
ORDINANCE NO. _____

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

HEMET, CALIFORNIA ACTING IN ITS CAPACITY AS THE

LEGISLATIVE BODY OF CITY OF HEMET COMMUNITY
FACILITIES DISTRICT NO. 2023-01 (MORGAN

CROSSING) AUTHORIZING THE LEVY OF A SPECIAL

TAX THEREIN
WHEREAS, the City Council of the City of Hemet (the “City Council”), has previously adopted Resolution No. 2023-076 entitled “A Resolution of Intention of the City Council of the City of Hemet, California, to Establish City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) and to Authorize the Levy of a Special Tax within City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing)” (the “Resolution of Intention”), stating its intention to conduct proceedings to form City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) (the “CFD”) pursuant to the Mello-Roos Community Facilities Act of 1982, as amended, commencing with Section 53311 of the California Government Code (the “Act”) to finance certain services (the “Services”) including incidental expenses, to serve the CFD; and
WHEREAS, the Resolution of Intention set June 13, 2023, at 7:00 p.m., or as soon thereafter as practical, as the date of a public hearing on all matters pertaining to the formation of the CFD, the extent of the CFD, the furnishing of Services to serve the CFD, and the proposed rate and method of apportionment of the special tax within the CFD (the “Rate and Method”); and
WHEREAS, a notice of public hearing was published and sent to all landowners proposed to be included in the CFD in accordance with the Act; and WHEREAS, at the public hearing, evidence was presented to the City Council on such matters before it, including a special report (the “Report”) describing the services necessary to adequately meet the needs of the CFD and the estimated costs of financing such Services as required by Section 53321.5 of the Act; and WHEREAS, at the public hearing, all persons desiring to be heard on all matters pertaining to the formation of the CFD, the extent of the CFD, the furnishing of Services to serve the CFD, and the Rate and Method were heard and a full and fair hearing was held; and
WHEREAS, subsequent to the public hearing, the City Council adopted a

Page 4 of 21 ends

13.B

Page 316 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Ordinance No. XXX
-2-
resolution entitled “Resolution of Formation of the City Council of the City of Hemet, California, to Establish City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing), to Establish an Appropriations Limit therefor, to Authorize the Submittal of the Levy of Special Taxes, and to Submit the Establishment of an Appropriations Limit, to the Qualified Electors of such Community Facilities District” (the “Resolution of Formation”) which established the CFD and authorized the levy of a special tax within the CFD; and
WHEREAS, subsequent to the public hearing, the City Council also adopted a resolution entitled “Resolution of the City Council of the City of Hemet, California, Calling a Special Election and Submitting to the Qualified Electors of City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) Propositions Regarding the Establishment of an Appropriations Limit and the Annual Levy of a Special Tax Within the Community Facilities District” (the “Resolution Calling Election”) which called a special election of the qualified electors within the CFD; and WHEREAS, pursuant to the terms of the Resolution Calling Election, an election was held in which qualified electors of the CFD approved the establishment of an appropriations limit for the CFD and the levy of a special tax (the “Special Tax”) within the CFD; and
WHEREAS, on June 13, 2023, the City Council adopted a resolution entitled “Resolution of the City Council of the City of Hemet, California, Declaring the Results of a Special Election in the City of Hemet Community Facilities District No. 2023-01 (Morgan Crossing) and Directing the Recording of a Notice of Special Tax Lien” (the “Resolution Declaring Results of Election”) which certified the results of the June 13, 2023 election conducted by the City Clerk, which results showed that more than twothirds of the votes cast in the CFD were in favor of the proposition to levy the Special Tax and the proposition to establish an appropriations limit for the CFD;

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET DOES HEREBY ORDAIN AS FOLLOWS:

1. Recitals. The above recitals are all true and correct.

2. Authorization of the Levy of a Special Tax. By the passage of this Ordinance, the City Council authorizes the levy of the Special Tax in the CFD in accordance with the Rate and Method set forth in the Exhibit “B” to the Resolution of Formation, which is on file in the office of the City Clerk and incorporated by reference herein.

3. Annual Rate Determination. The City Council is hereby further authorized to determine on or before August 10 each year, or such other date as is established by law or by the County Auditor-Controller of the County of Riverside, the specific Special Tax to be levied on each parcel of land in the CFD, except that special taxes to be levied shall not exceed the maximum rates set forth in the Rate and Method, but the special tax may be levied at a lower rate.

4. Exempt Property. Except as provided in Section 53340.1 of the Act and except for properties that a local agency is a landowner of within the meaning of subdivision (f) of Section 53317 of the Act, pursuant to Section 53340 of the Act,

Page 5 of 21 ends

13.B

Page 317 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Ordinance No. XXX
-3-
properties of entities of the state, federal and local governments shall be exempt from the levy of the Special Tax. Reference is hereby made to the Rate and Method for a description of other properties or entities that are expressly exempted from the levy of the Special Tax.

5. Use of Collections. All of the collections of the Special Tax shall be used only as provided by the Act and in the Resolution of Formation. The Special Tax shall be levied only so long as needed for the purposes as described in the Resolution of Formation.

6. Collection. The Special tax shall be collected in the same manner as ordinary ad valorem taxes and shall be subject to the same penalties and the same procedure, sale and lien in any case of delinquency as applicable for ad valorem property taxes; provided, however, that the Special Tax may be collected by direct billing by the City of the property owners in the CFD or in such other manner as may be provided by the City Council. In addition, the provisions of Section 53356.1 of the Act shall apply to any delinquent Special Tax payments.

7. Authorization. The specific authorization for adoption of the Ordinance is Section 53340 of the Act.

8. Severability. If for any reason any portion of the Ordinance is found to be invalid, or if the Special Tax is found inapplicable for any particular parcel within the CFD, by a court of competent jurisdiction, the balance of this Ordinance, and the application of the Special Tax to the remaining parcels within the CFD shall not be affected.

9. Certification. The City Clerk shall certify the passage of this Ordinance and cause it to be published or posted in accordance with law.

SECTION 1: PUBLICATION.

The City Clerk is authorized and directed to cause this Ordinance to be published within fifteen (15) days after its passage in a newspaper of general circulation and circulated within the City in accordance with Government Code Section 36933(a) or, to cause this Ordinance to be published in the manner required by law using the alternative summary and pasting procedure authorized under Government Code Section 39633(c).

INTRODUCED at the regular meeting of Hemet City Council on June 13, 2023.

APPROVED AND ADOPTED this 13th day of June, 2023.
_________________________
Joe Males, Mayor

Page 6 of 21 ends

13.B

Page 318 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Ordinance No. XXX
-4-
ATTEST: APPROVED AS TO FORM:
_________________________ _________________________
John Maier, City Clerk Steven Graham
City Attorney

Page 7 of 21 ends

13.B

Page 319 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
City of Hemet Ordinance No. XXX
-5-
State of California )
County of Riverside )
City of Hemet )
I, John Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing Ordinance was introduced and first read on the 13th day of June 2023, and had its second reading at the regular meeting of the Hemet City Council on the day of _______ , 2023, and was passed by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
_________________________________
John Maier, City Clerk

Page 8 of 21 ends

13.B

Page 320 of 1938 ends
Page 9 of 21 ends

13.B

Page 321 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 1

RATE AND METHOD OF APPORTIONMENT OF SPECIAL TAX FOR
COMMUNITY FACILITIES DISTRICT NO. 2023-01 (MORGAN CROSSING)

OF THE CITY OF HEMET, COUNTY OF RIVERSIDE, STATE OF CALIFORNIA A Special Tax (all capitalized terms are defined in Section A., “Definitions”, below) shall be applicable to each Parcel of Taxable Property located within the boundaries of Community Facilities District No. 2023-01 (Morgan Crossing) (the CFD). The amount of Special Tax to be levied on a Parcel in each Fiscal Year, commencing in Fiscal Year 2023-2024, shall be determined by the City Council of the City of Hemet, acting in its capacity as the legislative body of the CFD by applying the appropriate Special Tax as set forth in Sections B, C and D, below. All of the real property within the CFD, unless exempted by law or by the provisions of Section E. below, shall be taxed for the purposes, to the extent and in the manner herein provided.

A. DEFINITIONS
The terms hereinafter set forth have the following meanings:
“Acre or Acreage” means the land area of a Parcel as indicated on the most recent Assessor’s Parcel Map, or if the land area is not shown on the Assessor’s Parcel Map, the land area shown on the applicable Final Map, condominium plan, other recorded County map, or the land area calculated to the reasonable satisfaction of the Administrator using the boundaries set forth on such map or plan. “Act” means the Mello-Roos Community Facilities Act of 1982, as amended, being Chapter 2.5 of Part 1 of Division 2 of Title 5 of the Government Code of the State of California (Sections 53311 - 53368).
“Administrative Expenses” means all actual or reasonably estimated costs and expenses of the CFD that are chargeable or allocable to carry out duties of the CFD as allowed by the Act. This may include, without limitation, all costs and expenses arising out of or resulting from the annual levy and collection of the Special Tax (whether by the City, the Administrator or both), any litigation or appeal involving the CFD, and other administrative expenses of the City or Administrator directly related to the CFD.

Administrative Expenses shall also include amounts estimated or advanced by the City or CFD for attorney’s fees and other costs related to commencing and pursuing to completion any foreclosure as a result of delinquent Special Taxes. “Administrator” means an official of the City, or designee thereof, responsible for determining the annual amount of the levy and collection of the Special Taxes. “Approved Property” means all Parcels of Taxable Property: (i) that are included in a Final Map that was recorded prior to January 1st preceding the Fiscal Year in which the Special Tax is being levied; and (ii) that have not been issued a Building Permit prior to the April 1st preceding the Fiscal Year in which the Special Tax is being levied.

Page 10 of 21 ends

13.B

Page 322 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 2
“Assessor” means the Assessor of the County.
“Assessor’s Parcel Map” means an official map of the Assessor of the County designating Parcels by Assessor’s Parcel Number.
“Assessor’s Parcel Number” means the number assigned to a lot or Parcel for purposes of identification as determined from an Assessor Parcel Map or the applicable assessment roll.
“Base Year” means the Fiscal Year ending June 30, 2023. Rates in this Rate and Method of Apportionment are based on FY 2022-23 costs which will be escalated beginning in FY 2023-24.
“Boundary Map” means a recorded map of the CFD that indicates by a boundary line the extent of the territory identified to be subject to the levy of Special Taxes. "Building Permit" means the first legal document issued by a local agency giving official permission for new construction. For purposes of this definition, "Building Permit" shall not include any subsequent Building Permits issued or changed after the first issuance. “Capital Replacement” means to repair or replace improvements being maintained by the CFD.
“CFD” means Community Facilities District No. 2023-01 (Morgan Crossing) of the City of Hemet.
“City” means the City of Hemet, California
“Condominium Residential Property” means a Developed Parcel with an approved land use for residential condominiums (two or more attached units which can each be owned individually). Parcels that are open space, recreation, clubhouse, etc., owned by a condominium association, homeowner’s association or property owner’s association, are Exempt Property.
“Consumer Price Index” or “CPI” means the Consumer Price Index published by the U.S. Bureau of Labor Statistic for “All Urban Consumers” in the Riverside-San Bernardino-Ontario area.
“Consumer Price Index Inflation Factor” means, for any Fiscal Year, the annual change in the Consumer Price Index which shall be measured from the month of March in the Calendar Year that ends in the previous Fiscal Year to the month of March preceding the Fiscal Year. The Maximum Special Tax Rates in Table 1 and Table 2 shall be increased by the amount of the Consumer Price Index Inflation Factor, with a maximum annual increase of six percent (6%) and a minimum annual increase of two percent (2%) of the Maximum Special Tax Rates in effect for the previous Fiscal Year. In the event this index ceases to be published, the Consumer Price Index shall be another index as

Page 11 of 21 ends

13.B

Page 323 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 3
determined by the Administrator that is reasonably comparable to the Consumer Price Index for the Riverside-San Bernardino-Ontario Area.
“Council” means the City Council of the City acting as the legislative body of the CFD. “County” means the County of Riverside, California.
“Developed Property” means all Parcels of Taxable Property: (i) that are included in a Final Map that was recorded prior to January 1st preceding the Fiscal Year in which the Special Tax is being levied; and (ii) for which a Building Permit for new construction has been issued prior to April 1st preceding the Fiscal Year in which the Special Tax is being levied.
“Dwelling Unit” or “(D/U)” means a residential unit that is used or intended to be used as a domicile by one or more persons, as determined by the Administrator. “Exempt Property” means any Parcel that is exempt from Special Taxes pursuant to Section E., below.
“Final Map” means a subdivision of property by recordation of a Assessor’s Parcel Map or lot line adjustment, pursuant to the Subdivision Map Act (California Government Code Section 66410 et seq.) or recordation of a condominium plan pursuant to California Civil Code 1352 that creates individual lots for which Building Permits may be issued without further subdivision.
“Fiscal Year” means the 12-month period starting on July 1 of any calendar year and ending the following June 30.
“Land Use Class” means any of the classes listed in Table 1 of Section C., below. “Maximum Special Tax” means, for each Parcel in each Fiscal Year, the greatest Special Tax amount, determined in accordance with Section C., below, that may be levied on such Parcel in such Fiscal Year.
“Maximum Special Tax Rate (s)” means, for each Fiscal Year, the greatest Special Tax rate, determined in accordance with Section C., below, that may be levied on a Parcel in such Fiscal Year.
“Mixed Use Property” means all Parcels of Developed Property with more than one land use including residential, commercial, retail or other land uses. “Multifamily Residential Property” means all Parcels of Developed Property that consists of a building or buildings comprised of attached Dwelling Units available for rental by the general public, not for sale to an end user, and under common management.

Page 12 of 21 ends

13.B

Page 324 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 4
“Non-Residential Property” means all Parcels of Developed Property for which a Building Permit was issued, permitting the construction of one or more commercial, retail or other types of structure other than a residential structure. “Operating Reserves” means cash reserves to fund the Special Tax Requirement in the event of cash flow shortages or unexpected increases in operating, repair and maintenance costs (excluding capital improvements).
“Parcel(s)” means a lot or parcel within the CFD shown on an Assessor’s Parcel Map with an assigned Assessor’s Parcel Number valid as of July 1st for the Fiscal Year for which the Special Tax is being levied.
“Property Owner’s Association Property” means all Parcels that have been conveyed, dedicated to, or irrevocably offered for dedication to a property owner association, including any master or sub-association, prior to April 1 preceding the Fiscal Year in which the Special Tax is being levied. The Special Tax shall not be levied on Property Owner’s Association Property. If any Property Owner’s Association Property is converted to Taxable Property as the result of a sale of an Exempt Parcel to a private owner for residential or non-residential development, it shall become subject to the Special Tax in accordance with this Rate and Method of Apportionment as determined pursuant to Sections C. and D.
“Proportionately” means for Parcels of Taxable Property that are (i) Developed Property, the ratio of the applied Special Tax levy to the Maximum Special Tax is the same for all Parcels of Developed Property; (ii) Approved Property, the ratio of the applied Special Tax levy to the Maximum Special Tax is the same for all Parcels of Approved Property; and (iii) Undeveloped Property, Public Property or Property Owner’s Association Property, the ratios of the applied Special Tax levy per Acre to the Maximum Special Tax per Acre is the same for all Parcels of Undeveloped Property, Public Property and Property Owner’s Association Property.
“Public Property” means all Parcels which, as of April 1 st preceding the Fiscal Year in
which the Special Tax is being levied, are (i) used for rights-of-way or any other purpose and is owned by, dedicated to, or irrevocably offered for dedication to the federal government, the State, the County, City or any other public agency, provided, however, that any property leased by a public agency to a private entity and subject to taxation under Section 53340.1 of the Act shall be taxed and classified according to its use; or (ii) encumbered by an unmanned utility easement making impractical its utilization for other than the purpose set forth in the easement.
“Residential Property” means all Parcels of Developed Property for which a Building Permit has been issued permitting the construction of one or more residential Dwelling Units.
“Single Family Residential Property” means all Parcels of Residential Property, other than Condominium Residential Property and Multifamily Residential Property.

Page 13 of 21 ends

13.B

Page 325 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 5
“Special Tax(es)” means the Special Tax A or Special Tax B to be levied in each Fiscal Year on each Parcel of Taxable Property in accordance with Section D. “Special Tax A” means the special tax to be levied in each Fiscal Year on each Parcel of Taxable Property in accordance with Section D.1 to fund the Special Tax A Requirement.
“Special Tax Area A” means the parcels comprising Special Tax Area A as depicted and defined in the Boundary Map.
“Special Tax A Requirement” means for each Fiscal Year, the Special Tax A amount required to: (i) pay the estimated cost of Special Tax A Services for such Fiscal Year as determined by the City; (ii) fund the Special Tax A Reserve Fund in an amount not to exceed 20% of the Special Tax A Reserve Fund Requirement; (iii) pay Administrative Expenses; (iv) pay for an actual or anticipated shortfall due to Special Tax A delinquencies in the current or prior Fiscal Year; and (v) provide a credit for funds that are available to reduce the annual Special Tax A levy, if any, as determined by the Administrator. “Special Tax A Reserve Fund” means a fund to be used for Capital Replacement and Operating Reserves related to the Special Tax A Services. “Special Tax A Reserve Fund Requirement” equals $325,045 in the Base Year. The Special Tax A Reserve Fund Requirement shall be increased annually, commencing July 1, 2023, based on the percentage increase in the Consumer Price Index with a maximum annual increase of six percent (6%) and a minimum annual increase of two percent (2%) of the amount in effect in the previous Fiscal Year.
“Special Tax A Services” means: (i) Street light maintenance including energy charges, operation, maintenance, and administrative costs of streetlights within the CFD; (ii) the area known as Lot L on Tract Map 35392, including landscape maintenance (iii) landscape maintenance in the City right-of-way, or easement, to be financed, including streetscape, hardscape, pathways, access roads, slopes, and open space areas but excluding those areas/devices specifically identified in Special Tax B Services; and (iv) stormwater facilities and BMPs, including Lots A and O of Tract Map 35392. BMP maintenance means maintenance, administration and inspection of the stormwater facilities and BMPs including open space areas, and any other NPDES/WQMP/BMP related devices. BMP and landscape maintenance may include, but is not limited, to all landscaping materials such as turf, ground cover, shrub, trees, plants, irrigation and drainage systems, weed control and other abatements, street lights, electricity, repair/replacement and inspection. Inspection is inclusive of scheduling, travel time, visual inspection process and procedures, GPS location recording, reporting by device, annual reporting; visual inspection for functionality, vegetated as designed, irrigation is complete and in working order, noting any of the following: deficiencies, erosion, trash, silt, sediment, structural deficiencies. Maintenance is inclusive of repair or replacing any of the items noted as deficient or needing to be corrected to not be deficient.

Administration is inclusive of quality assurance and control of inspection and maintenance, general contract administration, including phone calls and procurement of

Page 14 of 21 ends

13.B

Page 326 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 6
goods and services; (iv) Litter and graffiti removal on soundwalls and other amenities and normal painting as required; and (iv) Other services as authorized under the Act. “Special Tax B” means the special tax that may be levied on each Parcel of Taxable Property in accordance with Section D.2 to fund the Special Tax B Requirement.

Maintenance of the Special Tax B Improvements shall be the responsibility of the Property Owner’s Association as long as the Special Tax B Improvements are being maintained to a standard acceptable to the City. Special Tax B shall not be levied in any year the City determines that the Special Tax B Improvements have been maintained to a standard acceptable to the City. Special Tax B shall begin to be levied in the first year in which the City determines that the Special Tax B Improvements, have not been maintained to a standard acceptable to the City. The City shall not levy Special Tax B without first giving notice to the Property Owner’s Association specifying the maintenance deficiency related to the Special Tax B Improvements and allowing a sufficient period, as determined by the City, for curing such deficiency.
“Special Tax Area B” means the parcels comprising Special Tax Area B as depicted and defined in the Boundary Map.
“Special Tax B Improvements” means the improvements that are maintained and operated as described in Special Tax B Services.
“Special Tax B Requirement” means for each Fiscal Year, the Special Tax B amount required to: (i) pay the estimated cost of Special Tax B Services for such Fiscal Year as determined by the City; (ii) fund the Special Tax B Reserve Fund in an amount not to exceed 20% of the Special Tax B Reserve Fund Requirement; (iii) pay Administrative Expenses related to Special Tax B Services; (iv) pay for the actual or anticipated shortfall due to Special Tax B delinquencies in the current or prior Fiscal Year; and (v) provide a credit for funds that are available to reduce the annual Special Tax B levy, if any, as determined by the Administrator. Special Tax B Reserve Fund shall not be funded unless it is determined Special Tax B Services are required.
“Special Tax B Reserve Fund” means a fund to be used for Capital Replacement and Operating Reserves related to the Special Tax B Services. “Special Tax B Reserve Fund Requirement” equals $81,083 in the Base Year. The Special Tax B Reserve Fund Requirement shall be increased annually, commencing July 1, 2023, based on the percentage increase in the Consumer Price Index with a maximum annual increase of six percent (6%) and a minimum annual increase of two percent (2%) of the amount in effect in the previous Fiscal Year.

“Special Tax B Services” means maintenance of (i) The area known as Lot E on Tract Map 35392, including landscape maintenance and (ii) Maintenance of four parks (Lot B, C, F J, and K of Tract Map 35392) including play structures and other park facilities and equipment; (iii) Entry monuments (iv) Litter and graffiti removal on soundwalls and other amenities and normal painting as required; and (v) Other services as authorized under the Act. Landscape maintenance may include, but is not limited to, all landscaping

Page 15 of 21 ends

13.B

Page 327 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 7
materials such as turf, ground cover, shrub, trees, plants, irrigation and drainage systems, weed control and other abatements, street lights, electricity, repair/replacement and inspection. Inspection is inclusive of scheduling, travel time; visual inspection processes and procedures, GPS location recording, reporting by device, annual reporting, visual inspection for functionality, vegetated as designed, irrigation is complete and in working order, noting any of the following: deficiencies, erosion, trash, silt, sediment, structural deficiencies. Maintenance is inclusive of repair or replacing any of the items noted as deficient or needing to be corrected to not be deficient. Administration is inclusive of quality assurance and control of inspection and maintenance, general contract administration, including phone calls and procurement of goods and services. “State” means the State of California.
“Taxable Property” means all Parcels within the boundary of the CFD, inclusive of Special Tax Area A and Special Tax Area B pursuant to the Boundary Map that are not exempt from the Special Tax pursuant to Section E., below. “Taxable Unit” means either a Dwelling Unit or an Acre, as shown in Table 1 or Table 2 of Section C.
“Undeveloped Property” means all Parcels of Taxable Property not classified as Developed Property, Approved Property, Public Property, or Property Owner’s Association Property.

B. ASSIGNMENT TO LAND USE CLASS
For each Fiscal Year, commencing Fiscal Year 2023-2024, all Parcels of Taxable Property shall be classified as either Developed Property, Approved Property, Undeveloped Property, Public Property, or Property Owner’s Association Property; and subject to the levy of Special Taxes in accordance with this Rate and Method of Apportionment as determined pursuant to Sections C. and D.

Parcels of Developed Property shall further be classified as Residential Property or NonResidential Property. Parcels of Residential Property shall further be classified as Single Family Residential Property, Condominium Residential Property or Multifamily Residential Property.

C. MAXIMUM SPECIAL TAX RATES
For each Fiscal Year commencing Fiscal Year 2023-2024, Maximum Special Tax Rates shall be determined as described below.

Page 16 of 21 ends

13.B

Page 328 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 8

1. Developed Property
The Maximum Special Tax Rate that may be levied on each Parcel classified as Developed Property shall be determined by reference to Table 1 below. Maximum Special Tax Rates are subject to annual escalation in accordance with Section C. 5.

TABLE 1
Maximum Special Tax Rates for Developed Property
Fiscal Year 2022-2023
1 Land Use
Class Description
Taxable
Unit
Maximum
Special Tax A
Per Taxable Unit
Maximum
Special Tax B
Per Taxable Unit
1 Single Family Residential Property D/U $1,083 $270
2 Condominium Residential Property D/U $758 $189
3 Multifamily Residential Property Acre $6,814 $1,700
4 Non-Residential Property Acre $6,814 $1,700
1 Max Rates are based on FY 2022-23 costs and will be increased by the Consumer Price Index Inflation Factor for the first levy in FY 2023-24.

Mixed Use Property
The Maximum Special Tax that may be levied on a Parcel of Mixed Use Property shall be the sum of the Maximum Special Tax for each of the Parcels land uses based on Table 1. The Maximum Special Tax Rate for Single Family Residential Property shall apply to any Dwelling Units on the property. The Maximum Special Tax Rate for Acreage shall apply to the other land uses on the property, with Acreage for each land use determined by reference to the approved site plan for such Parcel. Maximum Special Tax Rates are subject to annual escalation in accordance with Section C. 5.

2. Approved Property
In determining the Maximum Special Tax for each Parcel of Approved Property, the Undeveloped Property Maximum Special Tax Rate from Table 1 times the Acreage of such Parcel shall be applied; provided, however, that for a Parcel of Approved Property that is expected to become Single Family Residential Property, as reasonably determined by the Administrator based on the Final Map for such Parcel, the Maximum Special Tax for such Parcel of Approved Property shall be calculated utilizing Table 1 as if such Parcel were already designated as Single Family

Page 17 of 21 ends

13.B

Page 329 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 9
Residential Property. Maximum Special Tax Rates are subject to annual escalation in accordance with Section C. 5.

3. Undeveloped Property
The Maximum Special Tax Rate that may be levied on each Parcel of Undeveloped Property shall be determined by reference to Table 2 below. Maximum Special Tax Rates are subject to annual escalation in accordance with Section C. 5.

TABLE 2
Maximum Special Tax Rates for Undeveloped Property
Fiscal Year 2022-2023
1 Maximum Special Tax A
Per Acre
Maximum Special Tax B
Per Acre
$6,814 $1,700
1 Max Rates are based on FY 2022-23 costs and will be increased by the Consumer Price Index Inflation Factor for the first levy in FY 2023-24.

4. Taxable Public Property and Property Owner’s Association Property The Maximum Special Tax Rate that may be levied on each Parcel of Taxable Public Property or Taxable Property Owners Association Property shall be equal to the product of the applicable Undeveloped Property Maximum Special Tax Rates shown in Table 2 multiplied by the Acreage of such Parcel. Maximum Special Tax Rates are subject to annual escalation in accordance with Section C. 5.

5. Annual Maximum Special Tax Rate Increase
The Maximum Special Tax Rates in Table 1 and Table 2, shall be increased by the amount of the Consumer Price Index Inflation Factor, with a maximum annual increase of six percent (6%) and a minimum annual increase of two percent (2%) of the Maximum Special Tax Rates in effect for the previous Fiscal Year.

D. METHOD OF APPORTIONMENT OF THE SPECIAL TAX

1. Special Tax A
Commencing with Fiscal Year 2023-2024 and for each following Fiscal Year, the Administrator shall levy Special Tax A on all Taxable Property within Special Tax Area A up to the amount of the Special Tax A Requirement in accordance with the following steps:

Page 18 of 21 ends

13.B

Page 330 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 10
First: The Special Tax A shall be levied Proportionately on each Parcel of Developed Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax A Requirement; then Second: If additional moneys are needed to satisfy the Special Tax A Requirement after the first step has been completed, Special Tax A shall be levied Proportionately on each Parcel of Approved Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax A Requirement; then
Third: If additional moneys are needed to satisfy the Special Tax A Requirement after the first two steps have been completed, Special Tax A shall be levied Proportionately on each Parcel of Undeveloped Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax A Requirement.

2. Special Tax B
Commencing with Fiscal Year 2023-2024 and for each following Fiscal Year, the Administrator may levy Special Tax B on all Taxable Property within Special Tax Area B up to the amount of the Special Tax B Requirement in accordance with the following steps:

First: If levied, Special Tax B shall be levied Proportionately on each Parcel of Developed Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax B Requirement; then Second: If additional moneys are needed to satisfy the Special Tax B Requirement after the first step has been completed, Special Tax B shall be levied Proportionately on each Parcel of Approved Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax B Requirement; then
Third: If additional moneys are needed to satisfy the Special Tax B Requirement after the first two steps have been completed, Special Tax B shall be levied Proportionately on each Parcel of Undeveloped Property at up to 100% of the applicable Maximum Special Tax for each Parcel as needed to satisfy the Special Tax B Requirement.

Notwithstanding the above, under no circumstances will the Special Tax be levied in any Fiscal Year against any Parcel of Residential Property for which a Building Permit has been issued be increased by more than ten percent (10%) as a result of a delinquency in the payment of the Special Tax applicable to any other Parcel above the amount that would have been levied in that Fiscal Year had there never been any such delinquency or default.

Page 19 of 21 ends

13.B

Page 331 of 1938 ends

City of Hemet
CFD No. 2023-01 (Morgan Crossing)
Rate and Method of Apportionment Page 11
E. EXEMPTIONS
The Special Tax shall not be levied on Public Property or Property Owner’s Association Property. If any Public Property or Property Owner’s Association Property is converted to Taxable Property as the result of a sale of an Exempt Parcel to a private owner for residential or non-residential development, it shall become subject to the Special Tax in accordance with this Rate and Method of Apportionment as determined pursuant to Sections C. and D.

F. MANNER OF COLLECTION
The Special Tax shall be collected in the same manner and at the same time as ordinary ad valorem property taxes and shall be subject to the same penalties, the same procedure, sale and lien priority in the case of delinquency; provided, however, that the Administrator may directly bill the Special Tax or may collect the Special Tax at a different time or in a different manner if necessary to meet the financial obligations of the CFD, and provided further that the CFD may covenant to foreclose and may actually foreclose on Parcels having delinquent Special Taxes as permitted by the Act.

G. APPEALS
Any taxpayer may file a written appeal of the Special Tax on their Parcel(s) with the Administrator, provided that the appellant is current in their payments of Special Taxes.

During pendency of an appeal, all Special Taxes must be paid on or before the payment due date established when the levy was made. The appeal must specify the reasons why the appellant claims the Special Tax is in error. The Administrator shall review the appeal, meet with the appellant if the Administrator deems necessary, and advise the appellant of its determination. If the Administrator agrees with the appellant, the Administrator shall grant a credit to eliminate or reduce future Special Taxes on the appellant’s Parcel(s). No refunds of previously paid Special Taxes shall be made.

The Administrator shall interpret this Rate and Method of Apportionment and make determinations relative to the annual levy and administration of the Special Tax and any taxpayer who appeals, as herein specified.

H. TERM OF THE SPECIAL TAX
The Special Tax may not be prepaid. The Special Tax shall be levied annually in perpetuity unless terminated earlier by the City.

Page 20 of 21 ends

13.B

Page 332 of 1938 ends

40810 COUNTY CENTER DR.,
SUITE 200
TEMECULA, CA 92591
PHONE: (951) 676-8042
MBAKERINTL.COM s
V
V
V
V
V
V
FH s s
FH s s s s s
FH
FH
FH s
V s s
V
V
V
V
V
V
V
V
V
V
FH
FH
FH s
V s
FH FH
FH
FH
V
V
V V V
V
V V
V
V
V s
V
VFH
V V
V
V s s s

FH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X V
FH
V FH
V X
V

Page 21 of 21 ends

13.B

Page 333 of 1938 ends
Page 334 of 1938 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 27 2023
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Noah Rau, Public Works Director/City Engineer;
☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:

A Resolution of the City Council of the City of Hemet, California, Adopting a List of Projects for FY 2023- 2024 Funded by SB1: The Road Repair and Accountability Act of 2017 RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Adopting a List of Projects for FY 2023-2024 Funded by SB1: The Road Repair and Accountability Act of 2017.

BACKGROUND:

Senate Bill (SB) 1, Chapter 5, Statutes of 2017, created the Road Maintenance and Rehabilitation Program (RMRP) to address deferred maintenance on the State Highway System and the local street and road system, and the Road Maintenance and Rehabilitation Account (RMRA) for the deposit of various funds for the program. A percentage of this new RMRA funding is apportioned by formula to eligible cities and counties pursuant to Streets and Highways Code section 2032(h) for basic road maintenance, rehabilitation, and critical safety projects on the local streets and roads system.

The City of Hemet must adopt a budget each fiscal year appropriating revenues and expenditures for RMRA funds in accordance with SB1. The City must also submit an adopted list of projects to the California Transportation Commission (CTC) each fiscal year in order to receive RMRA funds.

The City Engineer has prepared the RMRA proposed project list for FY 2023/2024.

ANALYSIS:

The City is expected to receive approximately $2,172,264 of RMRA funding in FY 2023-2024.

There is one project proposed to be funded with the City’s FY 2023-2024 RMRA apportionment:
2023-2024 SB1 Pavement Rehabilitation

Page 1 of 9 ends

13.C

Page 335 of 1938 ends

• Project Description: The reconstruction of approximately 330,000 square feet of existing streets throughout the City.
• Project Location:
o Columbia Street - Florida Avenue to Grand Teton Avenue o Lyon Avenue - Hackney Street to Esplanade
o Raymond Street - Acacia Avenue to Florida Avenue
o Palm Avenue - Chambers Street to Thornton Avenue
o Gardenia Circle - Magnolia Circle to Buena Vista Street o Magnolia Circle - Gardenia Circle to Buena Vista Street o Fremont Place - Johnston Avenue to Northerly limits
• Estimated Project Schedule: Start design January 2024, Complete construction June 2024 • Estimated Useful Life: 20 years
DISCUSSION:

There are currently an abundance of streets in need of rehabilitation or reconstruction throughout the City. This FY 2023/2024 RMRA proposed project has been compiled with locations in need of reconstruction. The focus of most other projects that will be proposed this fiscal year will be rehabilitation projects intending to catch as much road area as possible in the rehabilitation category before it falls into the reconstruction category.

On June 12, 2023, the Infrastructure Commission reviewed the proposed project and recommended it for City Council approval.

STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 1: Enhance the visual appearance of the community to make it attractive and reduce blight.

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

FISCAL IMPACT:

There is no General Fund impact related to this item.

ALTERNATIVE(S):

1. Do not adopt the Resolution adopting the list of projects for FY 2023-2024 funded by SB1, the Road Repair and Accountability Act of 2017.

2. Provide alternate direction to staff.

Page 2 of 9 ends

13.C

Page 336 of 1938 ends

REVIEWED BY LEGAL:
☒ Staff report ☒ Resolution
☐ Ordinance ☐ Agreement
ATTACHMENT(S):

Attachment 1 - Reso Adopt FY2324 RMRA_Project-FINAL
Attachment 2 - FY 2324 RMRA Project Location Map

Page 3 of 9 ends

13.C

Page 337 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
CITY COUNCIL RESOLUTION NO. 2023-XXX
1 CITY OF HEMET
Hemet, California
RESOLUTION NO. 2023-XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

HEMET, CALIFORNIA, ADOPTING A LIST OF PROJECTS
FOR FISCAL YEAR 2023-24 FUNDED BY SB1: THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $2,172,264 in RMRA funding in Fiscal Year 2023-2024 from SB 1; and
WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and

Page 4 of 9 ends

13.C

Page 338 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
CITY COUNCIL RESOLUTION NO. 2023-XXX
2 WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and costeffective projects that also meet the communities’ priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate roughly 330,000 square feet of streets/roads with one project throughout the City this year and hundreds of similar projects into the future; and WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City’s streets and roads are in an “At Lower Risk” condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a “Good” condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials, and practices, will have significant positive co-benefits statewide.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET DOES HEREBY FIND AND RESOLVE:

1. The foregoing recitals are true and correct.

2. The following list of proposed projects will be funded in-part or solely with fiscal year 2023-2024 Road Maintenance and Rehabilitation Account revenues:
a) 2023-2024 SB1 Pavement Rehabilitation
• Project Description: The reconstruction of approximately 330,000 square of existing residential streets throughout the City.
• Project Location:
i. Columbia Street - Florida Avenue to Grand Teton Avenue ii. Lyon Avenue - Hackney Street to Esplanade
iii. Raymond Street - Acacia Avenue to Florida Avenue

Page 5 of 9 ends

13.C

Page 339 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
CITY COUNCIL RESOLUTION NO. 2023-XXX
3 iv. Palm Avenue - Chambers Street to Thornton Avenue
v. Gardenia Circle - Magnolia Circle to Buena Vista Street vi. Magnolia Circle - Gardenia Circle to Buena Vista Street vii. Fremont Place - Johnston Avenue to northerly limits • Estimated Project Schedule: Start design January 2024, Complete construction June 2024.
• Estimated Useful Life: 20 years
PASSED, APPROVED, AND ADOPTED this 27th day of June, 2023.

________________________________
Joe Males, Mayor

ATTEST:
__________________________
John Paul Maier, City Clerk

Page 6 of 9 ends

13.C

Page 340 of 1938 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
CITY COUNCIL RESOLUTION NO. 2023-XXX
4 State of California )
County of Riverside )
City of Hemet )
I, John Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 27th day of June 2023, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSTAIN: Council Members:

ABSENT: Council Members:
__________________________
John Paul Maier, City Clerk

Page 7 of 9 ends

13.C

Page 341 of 1938 ends
Page 8 of 9 ends

13.C

Page 342 of 1938 ends

Hemet, CA
445 E Florida Avenue
Hemet, CA 92543 -XQH202
202/2 SB1505$ PAVEMENT
RE&216758&7,21 LOCATION MAP
·
Legend
Project Streets
City Boundary
City Council Districts





Magnolia Cir
Gardenia Cir
Palm Ave
Fremont Pl
Lyon Ave
Columbia St
Raymond St.

Page 9 of 9 ends

13.C

Page 343 of 1938 ends
Page 344 of 1938 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 27 2023
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Greg Holyoak, Street Supervisor;
☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:

A Resolution of the City Council of the City of Hemet, California, Authorizing the Award of a Purchase Order to Quinn Caterpillar for a Caterpillar Model 259D3 Compact Track Loader in the Amount of $135,427.21 and Authorizing the Finance Director to Record a Supplemental Appropriation in the Streets Equipment Replacement Fund 380-4200-5400 in the amount of $10,427.21 and Authorizing the City Manager to Execute Purchase Orders in Support of this Purchase RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Authorizing the Award of a Purchase Order to Quinn Caterpillar for a Caterpillar Model 259D3 Compact Track Loader in the Amount of $135,427.21 and Authorize the Finance Director to Record a Supplemental Appropriation in the Streets Equipment Replacement Fund 380-4200-5400 in the amount of $10,427.21 and Authorizing the City Manager to Execute Purchase Orders in Support of this Purchase.

BACKGROUND:

The Streets Division is responsible for the maintenance and repairs of approximately 300 centerline miles of roadway. This entails maintenance and repairs to the asphalt surfaces, removal and replacement of the concrete cross gutters, handicap ramps, curb and gutter lines, and all City owned sidewalks, walkways, and drive approaches.

The Streets Division is also responsible for maintaining the roadside earthen ditches that serve to convey storm water runoff during storm events. Regular maintenance of these areas helps to maintain flow lines that will keep storm water off the traveled lanes. The division is also tasked with removing mud, rocks and other debris off the roadway.

Funding for the purchase of this Compact Track Loader is in the approved FY 22/23 Operating Budget Gas Tax (Streets) Equipment Replacement Fund No. 380-4200-5400 in the amount of $125,000. Staff is requesting a supplemental appropriation for the purchase of an additional asphalt grinder/planer

Page 1 of 42 ends

13.D

Page 345 of 1938 ends

attachment that will allow staff the ability to utilize the equipment to make more permanent asphalt repairs.

ANALYSIS:

Public works staff researched a number of compact track loaders in various makes, models and sizes prior to this recommendation to purchase the Caterpillar Model 259D3 Compact Track Loader from Quinn Caterpillar. This piece of equipment is equipped with a Tier 4 Final compliant engine, meeting the current highest emission standards, and is in compliance with Air Resources Board clean air regulations.

The Quinn Caterpillar Corporation provided a quote of $135,427.21 through a Sourcewell cooperative purchasing option contract #032119-CAT. Sourcewell allows municipalities the opportunity to procure equipment at competitive pricing that has been established through bid solicitations administered by other municipalities. Use of a Sourcewell contract for purchasing equipment meets the requirements of the Hemet Municipal Code and reduces administrative costs and delays associated with preparing a separate bid solicitation.

DISCUSSION:

Purchase of this compact track loader will provide an invaluable, multipurpose tool for the Public Works Department. Compact track loaders are a highly versatile piece of machinery that can perform a variety of tasks with their a large array of attachments. This piece of equipment is being purchased with a variety of attachments that include a mowing deck, a broom with a pickup bucket, a standard bucket, a brush grapple, and an asphalt planer/grinder with water tank. This piece of equipment can be used to assist the Streets Division with a variety of tasks like grinding asphalt to repair and patch bad sections of pavement, cleaning up debris from storms, loading vegetation and large illegal dumps, removing encampments, and mowing City owned properties and right of ways.

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

Objective 2: Evaluate existing practices to ensure continuity with industry best practices.

FISCAL IMPACT:

No General Fund Impact. Funding for this purchase was previously approved through Operating Budgets in Gas Tax (Streets) Equipment Replacement Fund No. 380-4200-5400 in the amount of $125,000. A supplemental appropriation is requested in the amount of $10,427.21 and is available in Fund 380.

As a result of staff's recommended action the available Gas Tax (Streets) Equipment Replacement Fund balance will be reduced by 135,427.21 and the Gas Tax (Streets) Equipment Replacement Fund projected available fund balance will amount to $593,027 for the remainder of the fiscal year 2022-23.

Page 2 of 42 ends

13.D

Page 346 of 1938 ends

ATTACHMENT(S):

Attachment 1: Resolution for CAT Compact Track Loader
Attachment 2: Compact Track Loader Price Quote
Attachment 3: Compact Track Loader Pictures
Attachment 4: CAT 032119-Contract Extension
Attachment 5: 032119-CAT - Pricing Information (1)
Attachment 6: CAT Contract 032119

Page 3 of 42 ends

13.D

Page 347 of 1938 ends

City of Hemet Resolution No. 2023-xxx

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2023-xxx

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF HEMET, CALIFORNIA AUTHORIZING

AWARD OF A PURCHASE ORDER TO QUINN

CATERPILLAR FOR A CATERPILLAR MODEL
259D3 COMPACT TRACK LOADER IN THE
AMONT OF $135,427.21 AND AUTHORIZING THE

FINANCE DIRECTOR TO RECORD A

SUPPLEMENTAL APPROPRIATION IN THE

STREETS EQUIPMENT REPLACEMENT FUND
380-4200-5400 IN THE AMOUNT OF $10,427.21

AND AUTHORIZING THE CITY MANAGER TO

EXECUTE A PURCHASE ORDER IN SUPPORT OF

THE AWARD
The City Council of the City of Hemet, California (hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, The Streets Division is responsible for the
maintenance and repairs of approximately 300 centerline miles of roadway; and
WHEREAS, The maintenance entails repair to asphalt
surfaces, removal and replacement of concrete surfaces, maintenance of roadside areas including shoulders and storm water ditches; and
WHEREAS, The compact track loader is a multipurpose tool that can perform a variety of tasks with its large array of attachments; and

Page 4 of 42 ends

13.D

Page 348 of 1938 ends

City of Hemet Resolution No. 2023-xxx
WHEREAS, Staff is requesting to purchase a Caterpillar
Model 259D3 Compact Track Loader from Quinn Caterpillar for $135,427.21; and
WHEREAS, Quinn Caterpillar provided a quote of
$135,427.21 through a Sourcewell Cooperative Purchasing Contract which allows municipalities the opportunity to procure equipment at competitive pricing that has been established through bid solicitations administered by other municipalities; and
WHEREAS, Majority funding for this purchase was
previously approved through Operating Budgets in Gas Tax (Streets) Equipment Replacement Fund No. 380-4200-5400 in the amount of $125,000; and
WHEREAS, Supplemental funding in the amount of
$10,427.21 is available
from Equipment Replacement Fund No. 380 Fund Balance
($603,454).

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY

OF HEMET FINDS, DETERMINES, ORDERS AND RESOLVES
AS FOLLOWS:

SECTION 1. The above recitals are all true and correct.

SECTION 2. Authorizes award of a purchase order to Quinn Caterpillar for a Caterpillar Model 259D3 Compact Track Loader in the amount of $135,427.21.

Page 5 of 42 ends

13.D

Page 349 of 1938 ends

City of Hemet Resolution No. 2023-xxx
SECTION 3. Authorizes the Finance Director to record a
supplemental appropriation in the amount of $10,427.21 from Gas Tax (Streets) Equipment Replacement Fund No. 380-4200-5400.

SECTION 4. Authorizing the City Manager to execute a
purchase order in support of the award.

SECTION 5. EFFECTIVE DATE - This Resolution shall
become effective on June 27, 2023.

Page 6 of 42 ends

13.D

Page 350 of 1938 ends

City of Hemet Resolution No. 2023-xxx
PASSED, APPROVED AND ADOPTED this 27th day of June,
2023.
____________________________
Joe Males, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 7 of 42 ends

13.D

Page 351 of 1938 ends

City of Hemet Resolution No. 2023-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 27th day of June, 2023, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members:

ABSTAIN: Council Members:

ABSENT: Council Members:
_____________________________
John Paul Maier, City Clerk

Page 8 of 42 ends

13.D

Page 352 of 1938 ends
Page 9 of 42 ends

13.D

Page 353 of 1938 ends

Quote 166218-01

Page 1 of 5 ends

166218-01
Apr 14, 2023

CITY OF HEMET
Attention: Account Payable
445 E FLORIDA AVE
HEMET, California 92543-4209
Attention: GREGG HOLYOAK
Dear Sir,
We would like to thank you for your interest in our company and our products, and are pleased to quote the following for your consideration.
2023 Sourcewell Contract#032119-Cat
One (1) New Caterpillar Inc. Model: 259D3 Compact Track Loader including standard and optional equipment as listed below.

STOCK NUMBER: TBD SERIAL NUMBER: TBD YEAR: 2023 SMU:

We wish to thank you for the opportunity of quoting on your equipment needs. This quotation is valid for 30 days, after which time we reserve the right to re-quote. If there are any questions, please do not hesitate to contact me.

Sincerely,
Justin Usary
Machine Sales Representative

Page 10 of 42 ends

13.D

Page 354 of 1938 ends

Quote 166218-01

Page 2 of 5 ends

One (1) New Caterpillar Inc. Model: 259D3 Compact Track Loader including standard and optional equipment as listed below.

Standard Equipment

POWERTRAIN
Cat C3.3B diesel engine Filter, cartridge type, hydraulic -Gross horsepower per SAE J1349 Filters, canister type, fuel

74.3 hp (55.4 kW) @ 2400 RPM and water separator
-Electric fuel priming pump Radiator / hydraulic oil
-Glow plugs starting aid cooler (side-by-side)
-Liquid cooled, direct injection Spring applied, hydraulically released, Air cleaner, dual element, radial seal parking brakes
S-O-S sampling valve, hydraulic oil Hydrostatic transmission

UNDERCARRIAGE
Suspension - independent torsion axle(4) Two speed motor

HYDRAULICS
ISO or H pattern controls: transmission control
Electro/hydraulic implement control Speed sensor guarding Electro/hydraulic hydrostatic

ELECTRICAL
12 volt electrical system -Two rear tail lights
80 ampere alternator -Dome light
Ignition key start / stop / aux switch Backup alarm
Lights: Electrical outlet, beacon
-Gauge backlighting

OPERATOR ENVIRONMENT
Operator warning system indicators: leaves seat or armrest raised:
-Air filter restriction -Hydraulic system disables
-Alternator output -Hydrostatic transmission disables
-Armrest raised / operator out of seat -Parking brake engages -Engine coolant temperature ROPS cab, open, tilt up
-Engine oil pressure Anti-theft security system w/6-button -Glow plug activation keypad
-Hydraulic filter restriction FOPS, Level I
-Hydraulic oil temperature Top and rear windows
-Park brake engages Floormat
-Engine emission system Interior rear view mirror
Gauges: fuel level and hour meter USB charging port
Storage compartment with netting Horn
Ergonomic contoured armrest Hand (dial) throttle, electronic

Page 11 of 42 ends

13.D

Page 355 of 1938 ends

Quote 166218-01

Page 3 of 5 ends

Control interlock dystem, when operator
FRAMES
Lift linkage, vertical path Belly pan cleanout
Chassis, one piece welded Support, lift arm
Machine tie down points (6) Rear bumper, welded

OTHER STANDARD EQUIPMENT
Engine enclosure - lockable Heavy duty flat faced quick disconnects Extended life antifreeze (-37C, -34F) with integrated pressure release Work tool coupler Split D-ring to route work tool hoses Hydraulic oil level sight gauge along side of left lift arm Radiator coolant level sight gauge Hydraulic demand cooling fan Radiator expansion bottle Per SAE J818-2007 and EN 474-3:2006 and Cat ToughGuard TM hose ISO 14397-1:2007

Page 12 of 42 ends

13.D

Page 356 of 1938 ends

Quote 166218-01

Page 4 of 5 ends

MACHINE SPECIFICATIONS
259D3 COMPACT TRACK LOADER 512-4259
LANE 2 - AVAILABLE FROM SANFORD FACTORY
LANE 3 - AVAILABLE FROM SANFORD FACTORY
Meets U.S. EPA Tier 4 Final emission standards
Available for AM-N, Chile, Puerto Rico, South Korea and Japan LANE 2 ORDER 0P-9002
CAB PACKAGE, ULTRA 588-9122
RUBBER BELT, 2 SPD, TF IDLERS 357-0240
TRACK,RUBBER,400MM(15.7 IN)BAR 454-6049
BATTERY,HD,DISCONNECT, 850 CCA 560-7824
REAR LIGHTS 356-6082
DOOR, CAB, POLYCARBONATE 539-8616
SEAT BELT, 3'' 542-6995
PRODUCT LINK, CELLULAR PL243 566-7115
CERTIFICATION ARR, P65 563-1163
INSTRUCTIONS, ANSI, USA 512-3765
SERIALIZED TECHNICAL MEDIA KIT 421-8926
FILM, RIDE CONTROL, ANSI 422-3445
COUNTERWEIGHT,MACHINE,EXTERNAL 345-5148
MOUNTING, FIRE EXTINGUISHER 563-7518
RIDE CONTROL 512-3484
BUCKET-GP, 74'', BOCE 279-5373
RAKE, IND. GRAPPLE, 84'' 286-9301
BROOM, UTILITY, BU118, BOCE 493-2259
BRUSHCUTTER, BR118 264-9400
COLD PLANER, PC305 529-5780
KIT, WATER SPRAY, PCX03/4/5 231-2590
KIT, WATER TANK, 44 US GAL 571-6876

Page 13 of 42 ends

13.D

Page 357 of 1938 ends

Quote 166218-01

Page 5 of 5 ends

WARRANTY & COVERAGE
Standard Warranty: 24 MONTHS / 2,000 HOURS FULL MACHINE Extended Coverage: 259-48 MO/2000 HR PREMIER
SELL PRICE $124,530.77
EXT WARRANTY Included
NET BALANCE DUE $124,530.77
SALES TAX (8.75%) $10,896.44
AFTER TAX BALANCE $135,427.21
F.O.B/TERMS:

Accepted by___________________________________ on ____________________ ______________________________
Signature

Page 14 of 42 ends

13.D

Page 358 of 1938 ends

Caterpillar 259D3 Compact Track Loader

Page 15 of 42 ends

13.D

Page 359 of 1938 ends

Compact Loader with Grapple Attachment
Compact Track Loader with Brush Mower Attachment

Page 16 of 42 ends

13.D

Page 360 of 1938 ends

Compact Track Loader with Pick up Broom Attachment
Compact Track Loader with Asphalt Grinder/Planer Attachment

Page 17 of 42 ends

13.D

Page 361 of 1938 ends

Letter of Agreement
To Extend the Contract
Between
Caterpillar Inc.
100 NE Adams St.

Peoria, IL 61629
And

Sourcewell
202 12th Street NE
Staples, MN 56479
Phone: (218) 894-1930

The Vendor and Sourcewell have entered into an Agreement (Contract #032119-CAT) for the procurement of Heavy Construction Equipment with Related Accessories, Attachments and Supplies. This Agreement has an expiration date of May 13, 2023, but the parties may extend the Agreement for one additional year by mutual consent.

The parties acknowledge that extending the Agreement for another year benefits the Vendor, Sourcewell and Sourcewell’s members. The Vendor and Sourcewell therefore agree to extend the Agreement listed above for a fifth year. This existing Agreement will terminate on May 14, 2024. All other terms and conditions of the Agreement remain in force.

Sourcewell
By: ___________________________________________, Its: Director of Operations & Procurement/CPO

Name printed or typed: Jeremy Schwartz___________________________________________

Date

Caterpillar Inc.

By: ___________________________________________, Its: _________________________

Name printed or typed: _________________________________________________________ Date







 




'


$%
"& %$&
"
#$&
!

'


&$
$"%

Page 18 of 42 ends

13.D

Page 362 of 1938 ends

2023 Sourcewell Caterpillar Cooperative Contract Discounts by Model Machine Model* New
Equipment
2023 Discount to Customer
(Off List Price)
Pavers
AP300 18.00% NOTE: Due to global supply chain cost increases:

AP355 18.00% 1. All new machines are subject to a commodity surcharge of up to 20%. (In some cases, increased tire costs may cause this number to be greater) AP400 18.00% 2. All new attachments are subject to a commodity surcharge of up to 25%.

AP455 18.00%
AP500 18.00%
AP555 18.00%
AP600 18.00%
AP655 18.00%
AP1000 18.00%
AP1055 18.00%
Rollers
CB1.7 19.00%
CB1.8 19.00%
CB7 19.00%
CB8 19.00%
CB10 19.00%
CB13 19.00%
CB15 19.00%
CB16 19.00%
CB2.5 19.00%
CB2.5GC 19.00%
CB2.7 19.00%
CB2.7GC 19.00%
CB2.9 19.00%
CB4.0 19.00%
CB4.4 19.00%
CC2.7 19.00%
CC2.7GC 19.00%
CC4.0 19.00%
CCS9 19.00%
CP11GC 19.00%
CP12GC 19.00%
CP34 19.00%
CP44 19.00%
CP54 19.00%
CP56 19.00%
CP68 19.00%
CP74 19.00%
CS10GC 19.00%
CS11GC 19.00%
CS12GC 19.00%
CS34 19.00%
CS44 19.00%
CS54 19.00%
CS56 19.00%
CS64 19.00%
CS68 19.00%
CS74 19.00%
CS78 19.00%
CW16 19.00%
CW34 19.00%
Track Type Tractors
D1 23.00%
D1 Fire Dozer 23.00%
D2 23.00%
D2 Fire Dozer 23.00%
D3 23.00%
D3 Fire Dozer 23.00%
D4 23.00%
D5 23.00%
D5 Fire Dozer 23.00%
D6 23.00%
D7 19.00%
D8 19.00%
D9 OTO
D10 OTO
Wheeled Excavators
M314 26.00%
M315 26.00%
M316 26.00%
M318 26.00%
M319 26.00%
M320 26.00%
M322 26.00%
Material Handlers
MH3022 26.00%
MH3024 26.00%
MH3026 26.00%
MH3040 26.00%
Cold Planers
PM310 20.00%
PM312 20.00%
PM313 20.00%
PM620 20.00%
PM622 20.00%
PM820 20.00%
PM822 20.00%
PM825 20.00%
Reclaimers
RM400 20.00%
RM500 20.00%
*Note: Base machines are listed. There may be several different base machine configurations available. The base machine discount will be applied to any model configuration plus any and all options listed on the Caterpillar Machine price list.
1 of 8 #Caterpillar: Confidential Green Page 19 of 42

13.D

Page 363 of 1938 ends

Machine Model* New
Equipment
2023 Discount to Customer
(Off List Price)
*Note: Base machines are listed. There may be several different base machine configurations available. The base machine discount will be applied to any model configuration plus any and all options listed on the Caterpillar Machine price list.

Telehandlers
TH255 23.00%
TH3510 24.00%
TH357 24.00%
TH408 24.00%
TL642 24.00%
TL943 24.00%
TL1055 24.00%
TL1255 24.00%
Motor Graders
120 34.00%
140 30.00%
140GC 30.00%
150 30.00%
160 30.00%
14 19.00%
Skid Steer Loaders
226 21.00%
232 21.00%
236 21.00%
242 21.00%
246 21.00%
262 21.00%
272 21.00%
Compact Track Loaders
239 21.00%
249 21.00%
259 21.00%
279 21.00%
289 21.00%
299 21.00%
299XE Land Management 21.00%
2 of 8 #Caterpillar: Confidential Green Page 20 of 42

13.D

Page 364 of 1938 ends

Machine Model* New
Equipment
2023 Discount to Customer
(Off List Price)
*Note: Base machines are listed. There may be several different base machine configurations available. The base machine discount will be applied to any model configuration plus any and all options listed on the Caterpillar Machine price list.

Excavators
300.9 20.00%
301.5 20.00%
301.7 20.00%
301.8 20.00%
302 20.00%
302.7 20.00%
303 20.00%
303.5 20.00%
304 20.00%
305 20.00%
306 20.00%
307.5 20.00%
308 20.00%
309 20.00%
310 20.00%
313 15.00%
313GC 16.00%
315 19.00%
315GC 20.00%
317 19.00%
317GC 20.00%
320 15.00%
320GC 16.00%
323 15.00%
325 15.00%
326 15.00%
330 15.00%
330GC 16.00%
335 15.00%
336 15.00%
340 15.00%
350 10.00%
352 10.00%
374 10.00%
Forest Machines
538 15.00%
548 15.00%
558 15.00%
568 15.00%
Backhoe Loaders
415 22.00%
416 22.00%
420 22.00%
428 Side Shift 22.00%
430 22.00%
432 Side Shift 22.00%
434 Side Shift 22.00%
440 22.00%
450 22.00%
Wheel Tractor Scrapers
621 18.00%
623 18.00%
627 18.00%
631 18.00%
637 18.00%
651 18.00%
657 18.00%
Articulated Trucks
725 17.00%
730 17.00%
735 17.00%
740 17.00%
740GC 17.00%
745 17.00%
Rigid Frame Trucks
770 3.00%
772 3.00%
773 3.00%
Landfill Compactors
816 12.00%
826 12.00%
836 12.00%
Wheel Dozers and Soil Compactors
814 15.00%
815 13.00%
816 15.00%
824 15.00%
825 13.00%
834 15.00%
Wheel Loaders
903 23.00%
906 23.00%
907 23.00%
908 23.00%
910 23.00%
914 23.00%
920 24.00%
926 24.00%
930 24.00%
938 24.00%
950GC 20.00%
950M 18.00%
962 18.00%
966 15.00%
3 of 8 #Caterpillar: Confidential Green Page 21 of 42

13.D

Page 365 of 1938 ends

Machine Model* New
Equipment
2023 Discount to Customer
(Off List Price)
*Note: Base machines are listed. There may be several different base machine configurations available. The base machine discount will be applied to any model configuration plus any and all options listed on the Caterpillar Machine price list.
966GC 20.00%
972 11.00%
980 11.00%
982 11.00%
988 11.00%
Track Loaders
953 19.00%
963 22.00%
973 23.00%
Aftermarket Worktools 15.00%
Caterpillar Safety Services 15.00%
Technology Enabled Safety
Solutions N/A
Used Equipment is discounted 20% from Original Customer List Rental Equipment is offered under Sourcewell contract #062320-CAT Parts & Service is discounted by the servicing dealer according to work order volume 4 of 8 #Caterpillar: Confidential Green Page 22 of 42

13.D

Page 366 of 1938 ends

this number to be greater)
5 of 8 #Caterpillar: Confidential Green Page 23 of 42

13.D

Page 367 of 1938 ends

6 of 8 #Caterpillar: Confidential Green Page 24 of 42

13.D

Page 368 of 1938 ends

7 of 8 #Caterpillar: Confidential Green Page 25 of 42

13.D

Page 369 of 1938 ends

8 of 8 #Caterpillar: Confidential Green Page 26 of 42

13.D

Page 370 of 1938 ends
Page 27 of 42 ends

13.D

Page 371 of 1938 ends
Page 28 of 42 ends

13.D

Page 372 of 1938 ends
Page 29 of 42 ends

13.D

Page 373 of 1938 ends
Page 30 of 42 ends

13.D

Page 374 of 1938 ends
Page 31 of 42 ends

13.D

Page 375 of 1938 ends
Page 32 of 42 ends

13.D

Page 376 of 1938 ends
Page 33 of 42 ends

13.D

Page 377 of 1938 ends
Page 34 of 42 ends

13.D

Page 378 of 1938 ends
Page 35 of 42 ends

13.D

Page 379 of 1938 ends
Page 36 of 42 ends

13.D

Page 380 of 1938 ends
Page 37 of 42 ends

13.D

Page 381 of 1938 ends
Page 38 of 42 ends

13.D

Page 382 of 1938 ends
Page 39 of 42 ends

13.D

Page 383 of 1938 ends
Page 40 of 42 ends

13.D

Page 384 of 1938 ends
Page 41 of 42 ends

13.D

Page 385 of 1938 ends

Sourcewell Contract #032119-CAT | Amendment #1

Page 1 of 1 ends

AMENDMENT #1
TO
CONTRACT #032119-CAT
THIS AMENDMENT is by and between Sourcewell and Caterpillar Inc. (Vendor).

Sourcewell awarded a contract to Vendor for Heavy Construction Equipment with Related Accessories, Attachments, and Supplies effective May 13, 2019, through May 13, 2023 (Contract). Vendor implemented changes to its dealer reporting system and now wishes to modify the Contract to accurately report Administrative Fee payment calculations.

The parties wish to amend the following terms within the Contract:

1. This Amendment is effective upon the date of the last signature below.

2. Any Contract term related to calculation of Administrative Fee that is paid to Sourcewell is deleted and replaced with the following:
“Vendor will pay to Sourcewell an Administration Fee calculated at 0.33% of Caterpillar’s MSRP for each piece of equipment purchased by Sourcewell’s Participating Entities.

Caterpillar will pay the Administration Fee to Sourcewell on a quarterly basis.” Except as amended above, the Contract remains in full force and effect.

Sourcewell Caterpillar Inc.

By: By:

Jeremy Schwartz, Chief Procurement Officer Dawn Zink
Date: Title:

Approved: Date:

By:

Chad Coauette, Executive Director/CEO
Date:




 
























 



Page 42 of 42 ends

13.D

Page 386 of 1938 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 27 2023
Department: Public Works
Submitted by: Mark Prestwich, City Manager
Travis Holyoak, Water/Waste Water Superintendent;
☐ Receive and File ☒ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:

A Resolution of the City Council of the City of Hemet, California, Awarding a Purchase Order in the Amount of $175,000.00 for Fiscal Year 2023/2024 for Pipeline Materials to Core and Main and Authorizing the City Manager to Execute the Purchase Order and Approve Change Orders up to 10% or $17,500
RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

Adopt a Resolution of the City Council of the City of Hemet, California, Awarding the Purchase of Pipeline Materials to Core and Main in the Amount of $175,000.00 for Fiscal Year 23/24 and Authorizing the City Manager to Execute a Purchase Order (PO) in Support of the Award and Change Orders up to 10%.

BACKGROUND:

The Water Division operates and maintains water distribution infrastructure serving over 9,700 residential and commercial water connections and a population of approximately 32,600 people. The system includes City-owned wells, water storage reservoirs, main lines and service laterals, fire hydrants, valve systems, and interagency connections. In order to safely supply water to our customers, the purchase of equipment, parts, and supplies are needed in a timely manner to provide maintenance and necessary repairs to the system 24 hours a day. Having an established annual purchase order allows staff to respond immediately by securing access to adequate inventory and saves staff time by eliminating the need for performing frequent bid solicitations.

ANALYSIS:

A solicitation to obtain competitive FY 23/24 pricing was posted through Planet Bids on May 4th, 2023, and bids were opened on May 25th, 2023. A total of 46 vendors were notified through Planet Bids. The City received three (3) responsive bids. Bid submissions were reviewed by the City’s Procurement Administrator and staff, and Core and Main were determined to be the lowest responsive bidder for Pipeline materials.

Page 1 of 51 ends

13.E

Page 387 of 1938 ends

DISCUSSION:

The Water Division forecasts the materials that will be needed each fiscal year for the operation and maintenance of the related infrastructure and obtains bids through a competitive process. Once awarded and a PO issued, this process makes material acquisitions much more efficient throughout the fiscal year for a variety of routine maintenance and emergency repairs to the system.

STRATEGIC PLAN INTEGRATION:

GOAL FIVE: ORGANIZATIONAL EFFECTIVENESS
To identify the work needed inside the City organization to effectively provide services to the community and ensure financial stability.

Objective 1: Operate in a financially sustainable manner.

Objective 2: Evaluate existing practices to ensure continuity with industry best practices.

FISCAL IMPACT:

There is no General Fund impact. Funding for water material purchases is in the recommended FY23/24 Operating Budget for Water Fund 571.

ALTERNATIVE(S):

1. Do not award the purchase order to Core and Main.

2. Provide alternative direction to City Staff.

ATTACHMENT(S):

Attachment 1 - Resolution Water Materials Award 23-24
Attachment 2 - Price Comparison 23-24 Materials Bids
Attachment 3 - Core & Main Bid
Attachment 4 - Ferguson Bid
Attachment 5 - HydroPro Solutions Bid

Page 2 of 51 ends

13.E

Page 388 of 1938 ends

City of Hemet Resolution No. 2023-xxx

CITY OF HEMET

HEMET, CALIFORNIA
RESOLUTION NO. 2023-xxx

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF HEMET, CALIFORNIA, AWARD A

PURCHASE ORDER IN THE AMOUNT OF
$175,000.00 FOR FISCAL YEAR 2023/2024 FOR

PIPELINE MATERIALS TO CORE AND MAIN AND

AUTHORIZING THE CITY MANAGER TO EXECUTE

THE PURCHASE ORDER AND APPROVE CHANGE
ORDERS UP TO 10% OR $17,500.

The City Council of the City of Hemet, California (hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, The Water Division operates and maintains
water distribution infrastructure serving over 9,700 residential and commercial water connections and a population of approximately 32,600; and
WHEREAS, In order to safely supply water to customers,
equipment, parts and supplies are needed in a timely manner to provide maintenance and necessary repairs to the system 24 hours a day; and
WHEREAS, A solicitation for annual pipeline materials to obtain competitive fiscal year 23/24 pricing was posted through Planet Bids and received three (3) responsivive bids; and WHEREAS, Staff has determined that the bid submitted by Core & Main is the lowest responsive bid for the requested annual Pipeline Materials.

NOW, THERFORE, THE CITY COUNCIL OF THE CITY OF

HEMET FINDS, DETERMINES, ORDERS AND RESOLVES AS
FOLLOWS: Award of a purchase order to Core and Main for annual pipeline materials purchases and; authorize the city manager to execute a purchase order in the amount of $175,000.00 in support of the award.

SECTION 1. The above recitals are all true and correct.

Page 3 of 51 ends

13.E

Page 389 of 1938 ends

City of Hemet Resolution No. 2023-xxx
SECTION 2. Authorizes the award of a purchase order to
Core and Main in the amount of $175,000.

SECTION 3. Authorizes the City Manager to execute all
documents related to the purchase order and approve change orders up to 10% or $17,500.

SECTION 4. This Resolution shall take effect upon its
adoption.

PASSED, APPROVED AND ADOPTED this 27th day of June 2023. .
____________________________
Joe Males, Mayor
ATTEST:
_____________________________
John Maier, City Clerk

Page 4 of 51 ends

13.E

Page 390 of 1938 ends

City of Hemet Resolution No. 2023-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing resolution was adopted by the Hemet City Council on the 27th day of June, 2023, and was passed by the following vote:

AYES: Council Members:

NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.
_____________________________
John Paul Maier, City Clerk

Page 5 of 51 ends

13.E

Page 391 of 1938 ends
Page 6 of 51 ends

13.E

Page 392 of 1938 ends

City of Hemet
Bid Results for Project 2023/2024 Pipeline Materials Bid Issued on 05/04/2023
Bid Due on May 25, 2023 3:00 PM (PDT)
Exported on 05/30/2023
Line Totals (Unit Price * Quantity) Ferguson CORE & MAIN Item Num Item Code Description UOM Qty Unit Price Line Total Unit Price Line Total Unit Price Line Total Line Total Line Total 1 W0001 Brass - 3/4" Coupling - Domestic Ea 1 $11.20 $11.20 $10.31 $10.31 $11.20 $10.31 2 W0003 Brass - 3/4" Close Nipple - Domestic Ea 1 $2.50 $2.50 $2.49 $2.49 $2.50 $2.49 3 W0005 Brass - 3/4 " X 4" Nipple - Domestic Ea 1 $5.40 $5.40 $5.36 $5.36 $5.40 $5.36 4 W0007 Brass - 3/4" X 6" Nipple - Domestic Ea 1 $7.90 $7.90 $7.83 $7.83 $7.90 $7.83 5 W0009 Brass - 3/4" X 12" Nipple - Domestic Ea 1 $14.20 $14.20 $13.98 $13.98 $14.20 $13.98 6 W0011 Brass - 3/4" Union - Domestic Ea 1 $40.70 $40.70 $37.37 $37.37 $40.70 $37.37 7 W0013 Brass - 3/4" Tee - Domestic Ea 1 $15.90 $15.90 $14.65 $14.65 $15.90 $14.65 8 W0015 Brass- 3/4" FIP Hose Bibb - Domestic Ea 1 $21.80 $21.80 $17.49 $17.49 $21.80 $17.49 9 W0016 Brass - 3/4 " MIP Hose Bibb - Domestic Ea 1 $38.40 $38.40 $17.49 $17.49 $38.40 $17.49 10 W0017 Brass - 3/4" - 45 Elbow - Domestic Ea 1 $16.60 $16.60 $16.28 $16.28 $16.60 $16.28 11 W0019 Brass - 3/4"- 90 Elbow - Domestic Ea 1 $12.70 $12.70 $12.48 $12.48 $12.70 $12.48 12 W0021 Brass - 3/4"- 90 St Elbow - Domestic Ea 1 $17.60 $17.60 $17.17 $17.17 $17.60 $17.17 13 W0023 Brass - 3/4" Plug - Domestic Ea 1 $8.00 $8.00 $7.80 $7.80 $8.00 $7.80 14 W0025 Brass - 3/4" Cap - Domestic Ea 1 $8.00 $8.00 $7.80 $7.80 $8.00 $7.80 15 W0060 Brass - 1" Coupling - Domestic Ea 1 $19.10 $19.10 $18.68 $18.68 $19.10 $18.68 16 W0062 Brass - 1" Close Nipple - Domestic Ea 1 $3.70 $3.70 $3.88 $3.88 $3.70 $3.88 17 W0064 Brass - 1" X 2" Nipple - Domestic Ea 1 $4.60 $4.60 $4.79 $4.79 $4.60 $4.79 18 W0066 Brass - 1" X 4" Nipple - Domestic Ea 1 $7.90 $7.90 $8.24 $8.24 $7.90 $8.24 19 W0068 Brass - 1" X 6" Nipple - Domestic Ea 1 $11.60 $11.60 $12.14 $12.14 $11.60 $12.14 20 W0070 Brass - 1" x 12" Nipple - Domestic Ea 1 $21.40 $21.40 $22.28 $22.28 $21.40 $22.28 21 W0072 Brass - 1" Union - Domestic Ea 1 $61.40 $61.40 $59.87 $59.87 $61.40 $59.87 22 W0074 Brass - 1" Tee - Domestic Ea 1 $33.20 $33.20 $32.40 $32.40 $33.20 $32.40 23 W0076 Brass - 1" X 45 Elbow - Domestic Ea 1 $28.40 $28.40 $27.77 $27.77 $28.40 $27.77 24 W0078 Brass - 1" X 90 Elbow - Domestic Ea 1 $20.80 $20.80 $20.29 $20.29 $20.80 $20.29 25 W0080 Brass - 1" X 90 St Elbow - Domestic Ea 1 $35.40 $35.40 $28.09 $28.09 $35.40 $28.09 26 W0082 Brass - 1" Plug - Domestic Ea 1 $12.70 $12.70 $12.48 $12.48 $12.70 $12.48 27 W0084 Brass - 1" Cap - Domestic Ea 1 $15.40 $15.40 $15.02 $15.02 $15.40 $15.02 28 W0086 Brass - 1" X 3/4" Reducer Bushing - Domestic Ea 1 $10.90 $10.90 $10.69 $10.69 $10.90 $10.69 29 W0088 Brass - 1" X 3/4" Bell Reducer - Domestic Ea 1 $21.60 $21.60 $21.15 $21.15 $21.60 $21.15 30 W0090 Brass - 1-1/2" Plug - Domestic Ea 1 $22.40 $22.40 $21.84 $21.84 $22.40 $21.84 31 W0092 Brass - 1" X 1-1/2" Bushing - Domestic Ea 1 $28.40 $28.40 $27.69 $27.69 $28.40 $27.69 32 W0096 Brass - 1-1/4" X 1" Reducer Bushing - Domestic Ea 1 $19.90 $19.90 $19.49 $19.49 $19.90 $19.49 33 W0100 Brass - 2" Coupling - Domestic Ea 1 $42.10 $42.10 $67.07 $67.07 $42.10 $67.07 34 W0102 Brass - 2" X Close Nipple - Domestic Ea 1 $10.90 $10.90 $11.40 $11.40 $10.90 $11.40 35 W0104 Brass - 2" X 4" Nipple/ Domestic Ea 1 $16.60 $16.60 $17.36 $17.36 $16.60 $17.36 36 W0106 Brass - 2" X 6" Nipple - Domestic Ea 1 $24.60 $24.60 $25.60 $25.60 $24.60 $25.60 37 W0108 Brass - 2" X 12" Nipple - Domestic Ea 1 $48.40 $48.40 $50.45 $50.45 $48.40 $50.45 38 W0110 Brass - 2" Union - Domestic Ea 1 $142.50 $142.50 $139.02 $139.02 $142.50 $139.02 39 W0112 Brass - 2" Tee - Domestic Ea 1 $92.70 $92.70 $90.48 $90.48 $92.70 $90.48 40 W0114 Brass - 2" X 45 Elbow - Domestic Ea 1 $92.00 $92.00 $89.77 $89.77 $92.00 $89.77 41 W0116 Brass- 2" X 90 - Domestic Ea 1 $73.10 $73.10 $71.29 $71.29 $73.10 $71.29 42 W0118 Brass - 2" X 90 St Elbow - Domestic Ea 1 $97.50 $97.50 $95.14 $95.14 $97.50 $95.14 43 W0120 Brass - 2" Plug - Domestic Ea 1 $36.70 $36.70 $35.84 $35.84 $36.70 $35.84 44 W0122 Brass - 2" Cap - Domestic Ea 1 $57.50 $57.50 $56.14 $56.14 $57.50 $56.14 45 W0124 Brass - 2" X3/4" Bell Reducer - Domestic Ea 1 $96.30 $96.30 $93.93 $93.93 $96.30 $93.93 46 W0126 Brass - 2" X 1" Bell Reducer - Domestic Ea 1 $96.30 $96.30 $93.93 $93.93 $96.30 $93.93 47 W0128 Brass - 2" X 1-1/2" Bell Reducer - Domestic Ea 1 $89.10 $89.10 $86.97 $86.97 $89.10 $86.97 48 W0130 Brass- 2" X 3/4" Reducing Bushing - Domestic Ea 1 $35.00 $35.00 $34.17 $34.17 $35.00 $34.17 49 W0132 Brass - 2" X 1" Reducing Bushing -Domestic Ea 1 $31.00 $31.00 $34.17 $34.17 $31.00 $34.17 50 W0134 Brass - 2" X 1-1/2" Reducer Bushing - Domestic Ea 1 $35.00 $35.00 $34.17 $34.17 $35.00 $34.17 51 W0140 Brass - 5/8" X 3" Bolt - Domestic Ea 1 $7.30 $7.30 $7.34 $7.34 $7.30 $7.34 52 W0142 Brass - 5/8" X 2-1/2" Bolt - Domestic Ea 1 $6.20 $6.20 $6.26 $6.26 $6.20 $6.26 53 W0146 Brass - 5/8" Nut- Domestic Ea 1 $2.30 $2.30 $2.32 $2.32 $2.30 $2.32 54 W0148 Brass - 5/8" Washer - Domestic Ea 1 $1.70 $1.70 $1.76 $1.76 $1.70 $1.76 55 W0201 Repair Band - 3/4" x 3" Redi-Clamp (Smith-Blair 245-00010503-000) Ea 1 $7.50 $7.50 $9.06 $9.06 $7.50 $9.06 56 W0203 Repair Band - 3/4" (.88) X 3" Full circle (Smith-Blair 244-00008803-000) Ea 1 $25.70 $25.70 $30.84 $30.84 $25.70 $30.84 57 W0205 Repair Band - 3/4" (.88) X 6" Full circle (Smith-Blair 244-00008806-000) Ea 1 $54.60 $54.60 $65.62 $65.62 $54.60 $65.62 58 W0207 Repair Band - 3/4" (1.05) X 3" Full Circle (Smith-Blair 244-00010503-000) Ea 1 $25.90 $25.90 $31.12 $31.12 $25.90 $31.12 59 W0209 Repair Band - 3/4" (1.05) X 6" Full Circle (Smith-Blair 244-00010506-000) Ea 1 $54.80 $54.80 $58.05 $58.05 $54.80 $58.05 60 W0211 Repair Band - 1" x 3" Redi-Clamp (Smith-Blair 245-00013203-000)Ea 1 $8.20 $8.20 $8.73 $8.73 $8.20 $8.73 61 W0213 Repair Band - 1" (1.13) X 3" Full Circle (Smith-Blair 244-00011303-000) Ea 1 $27.00 $27.00 $28.63 $28.63 $27.00 $28.63 62 W0215 Repair Band - 1" (1.32) X 3" Full Circle (Smith-Blair 244-00013203-000) Ea 1 $27.40 $27.40 $29.05 $29.05 $27.40 $29.05 63 W0217 Repair Band - 1" (1.13) X 6" Full Circle (Smith-Blair 244-00011306-000) Ea 1 $54.90 $54.90 $58.49 $58.49 $54.90 $58.49 64 W0219 Repair Band - 1"(1.32) X 6" Full Circle (Smith-Blair 244-00013206-000) Ea 1 $110.40 $110.40 $58.49 $58.49 $110.40 $58.49 65 W0221 Repair Band - 1.5" (1.63) X 3" Full Circle (Smith-Blair 244-00016303-000) - Copper Tubing Ea 1 $28.10 $28.10 $29.78 $29.78 $28.10 $29.78 66 W0223 Repair Band - 1.5"(1.90) X 3" Full Circle (Smith-Blair 244-00019003-000) - Steel Pipes Ea 1 $28.80 $28.80 $30.59 $30.59 $28.80 $30.59 67 W0225 Repair Band - 1.5" (1.63) X 6" Full Circle (Smith-Blair 244-00016306-000) - Copper Tubing Ea 1 $56.00 $56.00 $59.39 $59.39 $56.00 $59.39 68 W0227 Repair Band - 1.5" (1.90) X 6" Full Circle (Smith-Blair 244-00019006-000) - Steel Pipes Ea 1 $56.90 $56.90 $60.35 $60.35 $56.90 $60.35 69 W0229 Repair Band - 2" X 3" Redi-Clamp (Smith-Blair 245-00020003-000)Ea 1 $9.20 $9.20 $18.44 $18.44 $9.20 $18.44 70 W0231 Repair Band - 2" (2.13) X 3" Full Circle (Smith-Blair 244-00021303-000) Ea 1 $30.90 $30.90 $32.72 $32.72 $30.90 $32.72 71 W0233 Repair Band - 2" (2.38) X 3" Redi-Clamp (Smith-Blair 245-00023803-000) Ea 1 $9.90 $9.90 $10.53 $10.53 $9.90 $10.53 72 W0235 Repair Band - 2" (2.38) X 3" Full Circle (Smith-Blair 244-00023803-000) Ea 1 $31.40 $31.40 $33.32 $33.32 $31.40 $33.32 73 W0236 Full Circle Repair Clamp- 3" X 7.5" (2.97-3.35 OD Smith-Blair 261-00030007-000) Ea 1 $76.60 $76.60 $81.11 $81.11 $76.60 $81.11 74 W0237 Tapped Full Circle Repair Clamp w/1" Tap- 3" X 7.5" (3.46-3.70 OD Smith-Blair 264-35007-008) Ea 1 $113.00 $113.00 $122.40 $122.40 $113.00 $122.40 75 W0239 Full Circle Wide Range Repair Clamp - 3" X 12.5" (3.46-4.04 OD Smith-Blair 281-00035012-000) Ea 1 $159.30 $159.30 $172.51 $172.51 $159.30 $172.51 76 W0241 Tapped Full Circle Repair Clamp w/1" Tap- 3" X 7.5" (3.73-4.00 OD Smith-Blair 264-37507-008) Ea 1 $114.00 $114.00 $123.40 $123.40 $114.00 $123.40 77 W0243 Tapped Full Circle Repair Clamp w/1" Tap- 4" x 7.5" (3.96-4.25 OD Smith-Blair 264-40007-008) Ea 1 $115.90 $115.90 $125.48 $125.48 $115.90 $125.48 78 W0245 Tapped Full Circle Repair Clamp w/1" Tap- 4" X 7.5" (4.45-4.73 OD Smith Blair 264-45007-008) Ea 1 $121.20 $121.20 $131.26 $131.26 $121.20 $131.26 79 W0247 Tapped Full Circle Repair Clamp w/1" Tap- 4" X 7.5" (4.74-5.14 OD Smith-Blair 264-45007-008) Ea 1 $123.10 $123.10 $133.30 $133.30 $123.10 $133.30 80 W0249 Full Circle Wide Range Repair Clamp - 4" X 12.5" (4.45-5.14 OD Smith-Blair 281-00045012-000) Ea 1 $163.50 $163.50 $177.06 $177.06 $163.50 $177.06 81 W0251 Full Circle Wide Range Repair Clamp - 4" X 12.5" (4.75-5.45 OD Smith-Blair 281-00048012-000) Ea 1 $168.20 $168.20 $182.06 $182.06 $168.20 $182.06 82 W0253 Full Circle Repair Clamp - 4" X 12.5" (4.74-5.14 OD Smith-Blair 261-00048012-000) Ea 1 $132.70 $132.70 $143.63 $143.63 $132.70 $143.63 83 W0255 Full Circle Repair Clamp - 4" X 12.5" (4.95-5.35 OD Smith-Blair 261-00050012-000) Ea 1 $133.40 $133.40 $144.44 $144.44 $133.40 $144.44 84 W0256 Full Circle Repair Clamp - 4"-5" X 7.5" (5.22-5.62 OD Smith-Blair 226-00052507-000) Ea 1 $79.50 $79.50 $84.22 $84.22 $79.50 $84.22 85 W0257 Full Circle Repair Clamp - 4" X 12.5" (4.95-5.35 OD Smith-Blair 261-00050012-000) Ea 1 $133.40 $133.40 $144.44 $144.44 $133.40 $144.44 86 W0258 Full Circle Repair Clamp- 6" X 7.5" (5.95-6.35 OD Smith-Blair 226-00060007-000) Ea 1 $81.60 $81.60 $83.53 $83.53 $81.60 $83.53 HydroPro Solutions Ferguson Waterworks CORE & MAIN
Direct Comparison by Line

Page 7 of 51 ends

13.E

Page 393 of 1938 ends

87 W0259 Full Circle Wide Range Repair Clamp 6" X 7.5" (6.56-7.36 OD Smith-Blair 281-00066307-000) Ea 1 $99.80 $99.80 $120.27 $120.27 $99.80 $120.27 88 W0261 Full Circle Wide Range Repair Clamp 6" X 12.5" (6.56-7.36 OD Smith-Blair 281-00066312-000) Ea 1 $192.70 $192.70 $201.48 $201.48 $192.70 $201.48 89 W0263 Full Circle Wide Range Repair Clamp 6" X 7.5" ( 6.83-7.63 OD Smith-Blair 281-00069007-000) Ea 1 $106.40 $106.40 $108.87 $108.87 $106.40 $108.87 90 W0265 Full Circle Wide Range Repair Clamp 6" X 12.5" (6.83-7.63 OD Smith-Blair 281-00069012-000) Ea 1 $195.60 $195.60 $168.95 $168.95 $195.60 $168.95 91 W0267 Tapped Full Circle Repair Clamp w/2" Tap 6" X 12.5" (6.56-6.96 OD Smith-Blair 264-66312-014) Ea 1 $220.60 $220.60 $230.70 $230.70 $220.60 $230.70 92 W0269 Tapped Full Circle Repair Clamp w/2" Tap 6" X 12.5" (6.84-7.24 OD Smith-Blair 264-69012-014) Ea 1 $222.10 $222.10 $232.22 $232.22 $222.10 $232.22 93 W0271 Full Circle Wide Range Repair Clamp- 8" X 7.5" (8.54-9.34 OD Smith-Blair 281-00086307-000) Ea 1 $113.60 $113.60 $118.79 $118.79 $113.60 $118.79 94 W0273 Full Circle Wide Range Repair Clamp- 8" X 12.5" (8.54-9.34 OD Smith-Blair 281-00086312-000) Ea 1 $214.70 $214.70 $224.47 $224.47 $214.70 $224.47 95 W0275 Full Circle Wide Range Repair Clamp- 8" X 7.5" (8.99-9.79 OD Smith-Blair 281-00090507-000) Ea 1 $123.70 $123.70 $129.41 $129.41 $123.70 $129.41 96 W0277 Full Circle Wide Range Repair Clamp- 8" x 12.5" (8.99-9.79 OD Smith-Blair 281-00090512-000) Ea 1 $214.70 $214.70 $230.15 $230.15 $214.70 $230.15 97 W0279 Tapped Full Circle Repair Clamp w/2" Tap- 8" X 12.5" (8.54-8.94 OD Smith Blair 264-86312-014) Ea 1 $248.10 $248.10 $259.38 $259.38 $248.10 $259.38 98 W0281 Tapped Full Circle Repair Clamp w/2" Tap- 8" X 12.5" (8.99-9.39 OD Smith-Blair 264-90512-014) Ea 1 $248.80 $248.80 $260.14 $260.14 $248.80 $260.14 99 W0283 Full Circle Wide Range Repair Clamp- 10" X 7.5" (10.64-11.54 OD Smith-Blair 281-00107507-000) Ea 1 $139.10 $139.10 $145.52 $145.52 $139.10 $145.52 100 W0285 Full Circle Wide Range Repair Clamp- 10" X 12.5" (10.64-11.54 OD Smith-Blair 281-00107512-000) Ea 1 $268.30 $268.30 $280.57 $280.57 $268.30 $280.57 101 W0287 Full Circle Wide Range Repair Clamp- 10" X 7.5" (11.34-12.24 OD Smith-Blair 281-00114007-000) Ea 1 $158.00 $158.00 $165.22 $165.22 $158.00 $165.22 102 W0289 Full Circle Wide Range Repair Clamp- 10" X 12.5" (11.34-12.24 OD Smith-Blair 281-00114012-000) Ea 1 $270.90 $270.90 $283.30 $283.30 $270.90 $283.30 103 W0291 Full Circle Repair Clamp- 10-12" X 7.5" (12.00-12.40 OD Smith-Blair 261-00120007-000) Ea 1 $172.90 $172.90 $180.82 $180.82 $172.90 $180.82 104 W0293 Full Circle Repair Clamp- 10-12" X 12.5" (12.00-12.40 OD Smith-Blair 261-00120012-000) Ea 1 $276.60 $276.60 $289.27 $289.27 $276.60 $289.27 105 W0295 Full Circle Wide Range Repair Clamp- 12" X 7.5" (12.62-13.57 OD Smith-Blair 281-00127507-000) Ea 1 $158.00 $158.00 $165.21 $165.21 $158.00 $165.21 106 W0297 Full Circle Wide Range Repair Clamp- 12" X 12.5" (12.62-13.57 OD Smith-Blair 281-00127512-000) Ea 1 $277.10 $277.10 $289.78 $289.78 $277.10 $289.78 107 W0299 Full Circle Wide Range Repair Clamp- 12" X 7.5" (13.44-14.39 OD Smith-Blair 281-00135007-000) Ea 1 $188.80 $188.80 $197.43 $197.43 $188.80 $197.43 108 W0301 Full Circle Wide Range Repair Clamp- 12" X 12.5" (13.44-14.39 OD Smith Blair 281-00135012-000) Ea 1 $305.30 $305.30 $319.24 $319.24 $305.30 $319.24 109 W0303 Full Circle Repair Clamp- 12-14" X 7.5" (14.00-14.40 OD Smith-Blair 229-00140007-000) Ea 1 $162.78 $162.78 110 W0305 Full Circle Repair Clamp- 12-14" X 12.5" (14.00-14.40 OD Smith-Blair 229-00140012-000) Ea 1 $258.64 $258.64 111 W0307 Full Circle Repair Clamp- 14.38-15.13 X 15" (14.48-15.13 OD Smith Blair 228-201-43815-000) Ea 1 $553.60 $553.60 $578.80 $578.80 $553.60 $578.80 112 W0309 Full Circle Repair Clamp- 15.07-15.82 X 15" (15.07-15.82 OD Smith-Blair 228-20150715-000) Ea 1 $579.20 $579.20 $605.63 $605.63 $579.20 $605.63 113 W0311 Full Circle Repair Clamp- 15.92-16.67 X 15" (15.92-16.67 OD Smith-Blair 228-20159215-000) Ea 1 $590.10 $590.10 $616.95 $616.95 $590.10 $616.95 114 W0313 Full Circle Repair Clamp- 16.56-17.31 X 15" (16.56-17.31 OD Smith-Blair 228-20165615-000) Ea 1 $602.20 $602.20 $629.64 $629.64 $602.20 $629.64 115 W0510 Ball Valve - 1/4" Brass - Thread - FIP x FIP Ea 1 $24.40 $24.40 $25.72 $25.72 $24.40 $25.72 116 W0512 Ball Valve - 3/8" Brass - Thread - FIP x FIP Ea 1 $24.40 $24.40 $25.72 $25.72 $24.40 $25.72 117 W0514 Ball Valve - 1/2" Brass - Thread - FIP xFIP Ea 1 $24.40 $24.40 $25.72 $25.72 $24.40 $25.72 118 W0516 Ball Valve - 3/4" Brass - Thread - FIP x FIP Ea 1 $40.30 $40.30 $42.92 $42.92 $40.30 $42.92 119 W0518 Ball Valve - 1" MIP X COMP - Jones - E1935 Ea 1 $77.40 $77.40 $81.53 $81.53 $77.40 $81.53 120 W0520 Ball Valve - 1" MIP X FIP - Jones - E1931 Ea 1 $70.30 $70.30 $74.13 $74.13 $70.30 $74.13 121 W0522 Ball Valve - 2" MIP X COMP - Jones - E1935 Ea 1 $288.90 $288.90 $300.38 $300.38 $288.90 $300.38 122 W0524 Ball Valve - 2" MIP X FIP - Jones - E1931 Ea 1 $273.30 $273.30 $284.57 $284.57 $273.30 $284.57 123 W0540 Bolts - 10" - 12" Flange Set - Zinc Plated - Class 150# Ea 1 $34.60 $34.60 $30.60 $30.60 $34.60 $30.60 124 W0542 Bolts - 4" Flange Set -Zinc Plated - Class 150# Ea 1 $6.90 $6.90 $7.34 $7.34 $6.90 $7.34 125 W0544 Bolts - 6" - 8" Flange Set - Zinc Plated - Class 150# Ea 1 $17.60 $17.60 $11.78 $11.78 $17.60 $11.78 126 W0545 Nuts - 5/8" - Zinc Plated Ea 1 $1.60 $1.60 $0.27 $0.27 $1.60 $0.27 127 W0546 Bolts - 5/8" X 3" Hollow Bolt Ea 1 $1.50 $1.50 $1.34 $1.34 $1.50 $1.34 128 W0547 6" x 6-hole Hydrant Break-off Bolt Set 5/8" x 3" Zinc Plated Ea 1 $46.70 $46.70 $9.67 $9.67 $46.70 $9.67 129 W0600 Valve - 6" Butterfly FLG X FLG - Mueller Model Lineseal3 Ea 1 $880.60 $880.60 $880.69 $880.69 $880.60 $880.69 130 W0604 Valve - 8" Butterfly FLG X FLG - Mueller Model Lineseal3 Ea 1 $1,125.00 $1,125.00 $1,100.00 $1,100.00 $1,125.00 $1,100.00 131 W0608 Valve - 10" Butterfly FLG X FLG - Mueller Model Lineseal3 Ea 1 $1,551.10 $1,551.10 $1,516.67 $1,516.67 $1,551.10 $1,516.67 132 W0610 Valve - 12" Butterfly FLG X FLG - Mueller Model LIneseal3 Ea 1 $1,857.90 $1,857.90 $1,816.67 $1,816.67 $1,857.90 $1,816.67 133 W0620 Valve - 1" Brass Gate Ea 1 $92.00 $92.00 $98.45 $98.45 $92.00 $98.45 134 W0622 Valve - 1-1/4" Brass Gate Ea 1 $140.30 $140.30 $150.10 $150.10 $140.30 $150.10 135 W0624 Valve - 2" Brass Gate Ea 1 $195.20 $195.20 $208.82 $208.82 $195.20 $208.82 136 W0628 Valve - 4" Gate RW FLG X FLG - Muller 2360 Series Ea 1 $661.20 $661.20 $672.28 $672.28 $661.20 $672.28 137 W0629 Valve - 4" Gate RW SL X SL - Muller 2360 Series Ea 1 $873.60 $873.60 $696.24 $696.24 $873.60 $696.24 138 W0630 Valve - 4" Gate RW FLG X SL - Mueller 2360 Series Ea 1 $673.00 $673.00 $684.33 $684.33 $673.00 $684.33 139 W0634 Valve - 6" Gate RW SL X SL - Mueller 2360 Series Ea 1 $901.20 $901.20 $906.03 $906.03 $901.20 $906.03 140 W0636 Valve - 6" RW FLG X FLG - Mueller 2360 Series Ea 1 $883.80 $883.80 $888.60 $888.60 $883.80 $888.60 141 W0640 Valve - 6" Gate RW FLG X SL - Mueller 2360 Series Ea 1 $886.50 $886.50 $891.29 $891.29 $886.50 $891.29 142 W0646 Valve - 8" Gate RW FLG X FLG - Mueller 2360 Series Ea 1 $1,381.20 $1,381.20 $1,388.59 $1,388.59 $1,381.20 $1,388.59 143 W0648 Valve - 8" Gate RW FLG X SL - Mueller 2360 Series Ea 1 $1,401.10 $1,401.10 $1,408.57 $1,408.57 $1,401.10 $1,408.57 144 W0650 Valve - 10" Gate RW SL X SL - Mueller 2360 Series Ea 1 $2,211.60 $2,211.60 $2,174.54 $2,174.54 $2,211.60 $2,174.54 145 W0652 Valve - 10" Gate RW FLG X FLG/Mueller 2360 Series Ea 1 $2,194.90 $2,194.90 $2,158.13 $2,158.13 $2,194.90 $2,158.13 146 W0654 Valve - 10" Gate RW FLG X SL - Mueller 2360 Series Ea 1 $2,203.40 $2,203.40 $2,166.54 $2,166.54 $2,203.40 $2,166.54 147 W0656 Valve - 12" Gate RW SL X SL - Mueller 2360 Series Ea 1 $2,772.20 $2,772.20 $2,725.79 $2,725.79 $2,772.20 $2,725.79 148 W0658 Valve - 12" Gate RW FLG X FLG - Mueller 2360 Series Ea 1 $2,650.00 $2,650.00 $2,605.61 $2,605.61 $2,650.00 $2,605.61 149 W0660 Valve - 12" Gate RW FLG X SL - Mueller 2360 Series Ea 1 $2,710.90 $2,710.90 $2,665.52 $2,665.52 $2,710.90 $2,665.52 150 W0700 Comp Fit (Y) 1" X 3/4" X 3/4" - Jones - E2625 Ea 1 $45.10 $45.10 $48.78 $48.78 $45.10 $48.78 151 W0702 Comp Fit - 1" Comp Coupling - Jones - E2609 Ea 1 $25.00 $25.00 $26.13 $26.13 $25.00 $26.13 152 W0704 Comp Fit - 1" Comp X Comp 90 - Jones - E2611 Ea 1 $40.60 $40.60 $37.79 $37.79 $40.60 $37.79 153 W0706 Comp Fit - 1" Comp X MIP - Jones - E2605 Ea 1 $22.20 $22.20 $23.21 $23.21 $22.20 $23.21 154 W0708 Comp Fit - 1" Corp X MIP - Jones - E3403 Ea 1 $62.20 $62.20 $64.91 $64.91 $62.20 $64.91 155 W0710 Comp Fit - 1" X Corp (Taper) - Jones - E3401 Ea 1 $53.80 $53.80 $64.91 $64.91 $53.80 $64.91 156 W0712 Comp Fit - 1" X Flare Adapter - Jones - E2623 Ea 1 $28.60 $28.60 $32.83 $32.83 $28.60 $32.83 157 W0714 Comp Fit - 2" Comp Coupling - Jones - E2609 Ea 1 $119.20 $119.20 $124.38 $124.38 $119.20 $124.38 158 W0716 Comp Fit - 2" Comp X Comp 90 - Jones - E2611 Ea 1 $248.80 $248.80 $259.61 $259.61 $248.80 $259.61 159 W0718 Comp Fit - 2" Comp X FIP - Jones - E2607 Ea 1 $93.60 $93.60 $67.02 $67.02 $93.60 $67.02 160 W0720 Comp Fit - 2" Comp X MIP - Jones - E2605 Ea 1 $89.50 $89.50 $93.41 $93.41 $89.50 $93.41 161 W0722 Comp Fit - 3/4" Comp Coupling - Jones - E2609 Ea 1 $22.90 $22.90 $24.79 $24.79 $22.90 $24.79 162 W0724 Comp Fit - 3/4" Comp X Comp 90 - Jones - E2611 Ea 1 $28.20 $28.20 $30.48 $30.48 $28.20 $30.48 163 W0726 Comp Fit - 3/4" Corp X MIP - Jones - E3403 Ea 1 $41.00 $41.00 $44.37 $44.37 $41.00 $44.37 164 W0728 Comp Fit - 3/4" Flare Adapter - Jones - E2623 Ea 1 $15.60 $15.60 $23.13 $23.13 $15.60 $23.13 165 W0732 Comp Fit - 3/4" X FIP 90 - Jones - E2621 Ea 1 $29.00 $29.00 $31.39 $31.39 $29.00 $31.39 166 W0734 Comp Fit - 3/4" X FIP - Jones - E2607 Ea 1 $20.10 $20.10 $21.77 $21.77 $20.10 $21.77 167 W0736 Comp Fit - 3/4" X MIP - Jones - E2605 Ea 1 $18.80 $18.80 $19.63 $19.63 $18.80 $19.63 168 W0738 Comp Fit - 1" Insert For Plastic - Jones - J2810 Ea 1 $4.10 $4.10 $5.12 $5.12 $4.10 $5.12 169 W0740 Comp Fit - 3/4" Insert For Plastic - Jones - J2810 Ea 1 $2.90 $2.90 $3.64 $3.64 $2.90 $3.64 170 W0750 Copper Tubing -3/4" Schedule K- Domestic - 100' roll Ea 1 $631.00 $631.00 $6.25 $6.25 $631.00 $6.25 171 W0752 Copper Tubing - 1" Schedule K - Domestic - 100' roll Ea 1 $836.00 $836.00 $8.30 $8.30 $836.00 $8.30 172 W0754 Copper Tubing - 2" Schedule K - Domestic - 20' stick Ea 1 $417.20 $417.20 $23.87 $23.87 $417.20 $23.87 173 W0761 Fire Hyd - 2-1/2" X 2-1/2" X 4" - Jones - J3765R - Plastic Caps w/ 1-1/8" operator nut - Painted Yellow Ea 1 $5,308.50 $5,308.50 $5,423.92 $5,423.92 $5,308.50 $5,423.92 174 W0763 Fire Hyd - 2-1/2" X 4" - Jones - J3700R - Plastic Caps - w/ 1-1/8" operator nut - Painted Yellow Ea 1 $3,968.00 $3,968.00 $4,054.35 $4,054.35 $3,968.00 $4,054.35 175 W0769 Fire Hyd Breakaway - 6" X 12" - 6H X 6H Ea 1 $197.30 $197.30 $159.77 $159.77 $197.30 $159.77 176 W0771 Fire Hyd Breakaway - 6" X 12" - 6H X 8H Ea 1 $197.30 $197.30 $159.77 $159.77 $197.30 $159.77 177 W0773 Fire Hyd Breakaway - 6" X 4" - 6H X 6H Ea 1 $148.00 $148.00 $127.82 $127.82 $148.00 $127.82 178 W0775 Fire Hyd Breakaway - 6" X 4" - 6H X 8H Ea 1 $148.00 $148.00 $127.82 $127.82 $148.00 $127.82 179 W0777 Fire Hyd Breakaway - 6" X 6" - 6H X 6H Ea 1 $149.30 $149.30 $140.45 $140.45 $149.30 $140.45 180 W0779 Fire Hyd Breakaway - 6" X 8" - 6H X 6H Ea 1 $165.30 $165.30 $140.45 $140.45 $165.30 $140.45

Page 8 of 51 ends

13.E

Page 394 of 1938 ends

181 W0781 Fire Hyd Breakaway - 6" X 8" - 6H X 8H Ea 1 $165.30 $165.30 $140.45 $140.45 $165.30 $140.45 182 W0783 Fire Hyd Breakaway - 6" X 8" - 8H X 8H Ea 1 $165.30 $165.30 $140.45 $140.45 $165.30 $140.45 183 W0785 Fire Hyd Breakaway - 6" X 6" - 6H X8H Ea 1 $149.30 $149.30 $135.99 $135.99 $149.30 $135.99 184 W0790 Fire Hyd Bury - 6" x 36" - 6H x SL Ea 1 $502.60 $502.60 $429.22 $429.22 $502.60 $429.22 185 W0791 Fire Hyd Bury - 6" x 42" - 6H x SL Ea 1 $504.00 $504.00 $430.66 $430.66 $504.00 $430.66 186 W0792 Fire Hyd Bury - 6" x 48" - 6H x SL Ea 1 $521.30 $521.30 $445.71 $445.71 $521.30 $445.71 187 W0794 Fire Hyd Head - 2" Flusher - Jones - J342 Ea 1 $585.00 $585.00 $583.34 $583.34 $585.00 $583.34 188 W0796 Fire Hyd Nuts - 1-3/4" - For the Jones 3700 & 3765 Ea 1 $28.00 $28.00 $23.87 $23.87 $28.00 $23.87 189 W0850 12" Blind Flange - Steel - 12" X 12 Hole - Ea 1 $370.60 $370.60 $245.46 $245.46 $370.60 $245.46 190 W0852 3" Blind Flange - Steel - 3" X 4 Hole - Ea 1 $79.00 $79.00 $25.18 $25.18 $79.00 $25.18 191 W0854 4" Blind Flange - Steel - 4" X 8 Hole - Ea 1 $79.00 $79.00 $35.39 $35.39 $79.00 $35.39 192 W0856 6" Blind Flange - Steel - 6" X 6 Hole - Ea 1 $134.30 $134.30 $52.03 $52.03 $134.30 $52.03 193 W0858 6" Blind Flange - Steel - 6" X 8 Hole - Ea 1 $102.60 $102.60 $98.08 $98.08 $102.60 $98.08 194 W0860 8" Blind Flange - Steel - 8" X 8 Hole - Ea 1 $201.40 $201.40 $84.62 $84.62 $201.40 $84.62 195 W0900 Flex Adapter - 3/4" Rubber Gasket Insert - SmithBlair 000-00038421-069 Ea 1 $7.60 $7.60 $8.06 $8.06 $7.60 $8.06 196 W0902 Flex Adapter - 1" Rubber Gasket Insert - SmithBlair 000-00038422-069 Ea 1 $8.00 $8.00 $8.50 $8.50 $8.00 $8.50 197 W0904 Flex Coupler - 3/4" X 6" Pvc/Stl R1.05 - SmithBlair Type 411 Ea 1 $29.90 $29.90 $31.71 $31.71 $29.90 $31.71 198 W0906 Flex Coupler - 1" X 6" Pvc/Stl R1.32 - SmithBlair Type 411 Ea 1 $30.90 $30.90 $32.82 $32.82 $30.90 $32.82 199 W0908 Flex Coupler - 1-1/2" Pvc/Stl R1.90 - SmithBlair Type 411 Ea 1 $38.70 $38.70 $41.03 $41.03 $38.70 $41.03 200 W0910 Flex Coup - 2" Standard - SmithBlair Type 411 Ea 1 $43.90 $43.90 $46.49 $46.49 $43.90 $46.49 201 W0912 Flex Coup - 2-1/2" - R2.65-2.88 - SmithBlair Type 461 Ea 1 $57.30 $57.30 $78.19 $78.19 $57.30 $78.19 202 W0915 Flex Coup - 4" - 4.46-5.60 - SmithBlair Type 461 Ea 1 $110.70 $110.70 $117.31 $117.31 $110.70 $117.31 203 W0926 Flex Coup - 6" - 6.28-6.63 - SmithBlair Type 461 Ea 1 $159.78 $159.78 204 W0928 Flex Coup - 6" - 6.54-7.65 - SmithBlair Type 461 Ea 1 $152.80 $152.80 $159.78 $159.78 $152.80 $159.78 205 W0937 Flex Coup - 8" - 8.54-9.85 - SmithBlair Type 461 Ea 1 $178.30 $178.30 $186.43 $186.43 $178.30 $186.43 206 W0946 Flex Coup - 10" - 10.65-12.20 - SmithBlair Type 461 Ea 1 $224.10 $224.10 $234.36 $234.36 $224.10 $234.36 207 W0947 Flex Coup - 10" - 10.64-11.97 - SmithBlair Type 461 Ea 1 $234.36 $234.36 208 W0948 Flex Coup - 10" - 11.90-12.20 - SmithBlair Type 461 Ea 1 $234.36 $234.36 209 W0950 Flex Coup - 12" - 13.20-13.50 - SmithBlair Type 461 Ea 1 $277.21 $277.21 210 W0952 Flex Coup - 12" - 12.75-14.40 - SmithBlair Type 461 Ea 1 $265.10 $265.10 $277.21 $277.21 $265.10 $277.21 211 W1000 2" Top Bolt Flex Coupling - Smith-Blair # 421-02130295-031 Ea 1 $109.70 $109.70 $109.93 $109.93 $109.70 $109.93 212 W1002 3" Top Bolt Flex Coupling - Smith-Blair # 421-03100420-031 Ea 1 $144.70 $144.70 $145.03 $145.03 $144.70 $145.03 213 W1004 4" Top Bolt Flex Coupling - Smith-Blair # 421-04460560-031 Ea 1 $181.50 $181.50 $181.98 $181.98 $181.50 $181.98 214 W1006 6" Top Bolt Flex Coupling - Smith-Blair # 421-06560760-031 Ea 1 $239.70 $239.70 $320.41 $320.41 $239.70 $320.41 215 W1008 8" Top Bolt Flex Coupling - Smith-Blair # 421-08540985-031 Ea 1 $271.50 $271.50 $262.83 $262.83 $271.50 $262.83 216 W1010 10" Top Bolt Flex Coupling - Smith-Blair # 421-10641183-031 Ea 1 $345.40 $345.40 $334.43 $334.43 $345.40 $334.43 217 W1012 12" Top Bolt Flex Coupling - Smith-Blair # 421-12621367-031 Ea 1 $422.10 $422.10 $408.64 $408.64 $422.10 $408.64 218 W1014 10" OS TopBolt Coupling - Smith-Blair # 421-10641220-031 Ea 1 $375.90 $375.90 $363.93 $363.93 $375.90 $363.93 219 W1016 12" OS TopBolt Coupling - Smith-Blair # 421-12621440-031 Ea 1 $502.40 $502.40 $486.35 $486.35 $502.40 $486.35 220 W1018 2" HYMAX2 Flex Coupling Part # 860-54-0054-16 Ea 1 $138.40 $138.40 $144.03 $144.03 $138.40 $144.03 221 W1020 3" HYMAX2 Flex Coupling Part # 860-54-0088-16 Ea 1 $182.70 $182.70 $190.00 $190.00 $182.70 $190.00 222 W1022 4" HYMAX2 Flex Coupling Part # 860-54-0108-16 Ea 1 $234.10 $234.10 $243.46 $243.46 $234.10 $243.46 223 W1024 6" HYMAX2 Flex Coupling Part # 860-54-0163-16 Ea 1 $310.00 $310.00 $322.44 $322.44 $310.00 $322.44 224 W1026 7" HYMAX2 Flex Coupling Part # 860-54-0190-16 Ea 1 $336.00 $336.00 $34.19 $34.19 $336.00 $34.19 225 W1028 8" HYMAX2 Flex Coupling Part # 860-54-0217-16 Ea 1 $350.00 $350.00 $351.63 $351.63 $350.00 $351.63 226 W1030 10" HYMAX2 Flex Coupling Part # 860-54-0272-16 (OD Closed 10.70-11.37 Open 11.33-12.00) Ea 1 $450.30 $450.30 $452.35 $452.35 $450.30 $452.35 227 W1032 10" HYMAX2 Flex Coupling Part # 860-54-0278-16 (OD Closed 10.96 -11.63 Open 11.59-12.26) Ea 1 $476.10 $476.10 $478.29 $478.29 $476.10 $478.29 228 W1034 12" HYMAX2 Flex Coupling Part # 860-54-0315-16 (OD Closed 12.40-13.03 Open 12.99-13.66) Ea 1 $531.50 $531.50 $533.91 $533.91 $531.50 $533.91 229 W1036 12" HYMAX2 Flex Coupling Part # 860-54-0334-16 (OD Closed 13.15-13.78 Open 13.74-14.41) Ea 1 $635.90 $635.90 $638.75 $638.75 $635.90 $638.75 230 W1038 4" Rubber Gasket - 1/8" Neoprene (8 Holes) Full Face 150# Ea 1 $9.20 $9.20 $2.13 $2.13 $9.20 $2.13 231 W1040 6" Rubber Gasket - 1/8" Neoprene (6 Holes) Full Face 150# Ea 1 $4.40 $4.40 $3.32 $3.32 $4.40 $3.32 232 W1042 6" Rubber Gasket - 1/8" Neoprene (8 Holes) Full Face 150# Ea 1 $11.80 $11.80 $3.32 $3.32 $11.80 $3.32 233 W1044 8" Rubber Gasket - 1/8" Neoprene (8 Holes) Full Face 150# Ea 1 $16.10 $16.10 $4.43 $4.43 $16.10 $4.43 234 W1103 FCA - 6" - 6.28 - 6.63 - SmithBlair Type 912 Ea 1 $207.40 $207.40 $216.83 $216.83 $207.40 $216.83 235 W1105 FCA - 6" - 6.90 - 7.20 - SmithBlair Type 912 Ea 1 $207.40 $207.40 $216.83 $216.83 $207.40 $216.83 236 W1108 FCA - 8" - 8.54 - 8.70 - SmithBlair Type 912 Ea 1 $284.60 $284.60 $297.63 $297.63 $284.60 $297.63 237 W1109 FCA - 8" - 8.56 - 8.69 -SmithBlair Type 912 Ea 1 $297.63 $297.63 238 W1110 FCA - 8" - 8.54 - 9.11 - SmithBlair Type 912 Ea 1 $284.60 $284.60 $297.63 $297.63 $284.60 $297.63 239 W1111 FCA - 10" - 11.04 - 11.16 - SmithBlair Type 912 Ea 1 $532.76 $532.76 240 W1112 FCA - 10" - 11.90 - 12.12 - SmithBlair Type 912 Ea 1 $515.30 $515.30 $532.76 $532.76 $515.30 $532.76 241 W1113 FCA - 10" - 11.10 - 11.60 - SmithBlair Type 912 Ea 1 $515.30 $515.30 $532.76 $532.76 $515.30 $532.76 242 W1114 FCA - 10" - 10.70 - 11.10 - SmithBlair Type 912 Ea 1 $532.76 $532.76 243 W1117 FCA - 12" - 13.20 - 13.50 - SmithBlair Type 912 Ea 1 $573.10 $573.10 $532.76 $532.76 $573.10 $532.76 244 W1118 FCA - 12" - 13.14 - 13.26 - SmithBlair Type 912 Ea 1 $532.76 $532.76 245 W1201 Gasket - 3" Flange - Non-Asbestos - Ring Ea 1 $2.30 $2.30 $2.32 $2.32 $2.30 $2.32 246 W1203 Gasket - 4" Flange - Non-Asbestos - Ring Ea 1 $2.30 $2.30 $3.00 $3.00 $2.30 $3.00 247 W1205 Gasket - 6" Flange - Non-Asbestos - Ring Ea 1 $3.90 $3.90 $4.40 $4.40 $3.90 $4.40 248 W1207 Gasket - 8" Flange - Non-Asbestos - Ring Ea 1 $5.60 $5.60 $6.97 $6.97 $5.60 $6.97 249 W1209 Gasket - 10" Flange - Non-Asbestos - Ring Ea 1 $7.90 $7.90 $10.68 $10.68 $7.90 $10.68 250 W1211 Gasket - 12" Flange - Non-Asbestos - Ring Ea 1 $11.50 $11.50 $13.44 $13.44 $11.50 $13.44 251 W1213 Gasket - 14" Flange - Non-Asbestos - Ring Ea 1 $14.10 $14.10 $15.13 $15.13 $14.10 $15.13 252 W1215 Gasket - 3" Flange FF 1/8" Rubber Ea 1 $1.74 $1.74 253 W1217 Gasket - 4" Flange FF 1/8" Rubber Ea 1 $2.03 $2.03 254 W1219 Gasket - 6" Flange FF 1/8" Rubber (6 Hole) Ea 1 $3.13 $3.13 255 W1221 Gasket - 6" Flange FF 1/8" Rubber (8 Hole) Ea 1 $3.13 $3.13 256 W1223 Gasket - 8" Flange FF 1/8" Rubber Ea 1 $3.84 $3.84 257 W1225 Gasket - 10" Flange FF 1/8" Rubber Ea 1 $5.42 $5.42 258 W1227 Gasket - 12" Flange FF - 1/8" Rubber Ea 1 $7.40 $7.40 259 W1301 Meter - 5/8 Meter Swivel Nut X 3/4" Pack Joint 90 -Ford - L34-23-NL Ea 1 $26.90 $26.90 $28.20 $28.20 $26.90 $28.20 260 W1303 Meter - 1" Meter Swivel Nut X 1" Pack Joint 90 - Ford - L34-44-NLEa 1 $42.70 $42.70 $44.66 $44.66 $42.70 $44.66 261 W1305 Meter - 3/4" X Comp Tailpiece - Ford Ea 1 $19.63 $19.63 262 W1307 Meter - 1" X Comp Tailpiece - Ford Ea 1 $23.21 $23.21 263 W1309 Meter - 3/4" X MIP Tailpiece (2-1/2") - Jones - E130 Ea 1 $11.40 $11.40 $11.91 $11.91 $11.40 $11.91 264 W1311 Meter - 1" X MIP Tailpiece (2-1/2") - Jones - E130 Ea 1 $46.40 $46.40 $48.48 $48.48 $46.40 $48.48 265 W1313 Meter - 1" Bushing - Jones - J128H - 1" X 1.25" Ea 1 $17.30 $17.30 $18.08 $18.08 $17.30 $18.08 266 W1314 Meter - 1" Bushing - Ford Part # BBIM-44-NL Ea 1 $13.90 $13.90 $14.31 $14.31 $13.90 $14.31 267 W1315 Meter - 2" Flange - Jones - J129 Ea 1 $73.50 $73.50 $76.71 $76.71 $73.50 $76.71 268 W1316 Meter - 1.5" Flange - Jones - J129 Ea 1 $56.30 $56.30 $58.77 $58.77 $56.30 $58.77 269 W1317 Gasket - Meter 2" w/Fiber - Full Face - Rubber Ea 1 $1.60 $1.60 $1.25 $1.25 $1.60 $1.25 270 W1318 Gasket - Meter 2" w/Fiber - Drop in - Rubber Ea 1 $1.60 $1.60 $1.13 $1.13 $1.60 $1.13 271 W1319 Gasket - Meter 1.5" w/Fibre - Full Face - Rubber Ea 1 $1.40 $1.40 $0.88 $0.88 $1.40 $0.88 272 W1320 Gasket - Meter Gasket - Nylon - 3/4" X 1/8" (& 3/4" X 1/16") Ea 1 $0.50 $0.50 $0.32 $0.32 $0.50 $0.32 273 W1321 Gasket - Meter Gasket - Nylon - 1" X 1/8" (& 1" X 1/16") Ea 1 $0.50 $0.50 $0.35 $0.35 $0.50 $0.35 274 W1323 Meter - 3/4" Ams X Comp - Jones - J4201 Ea 1 $48.80 $48.80 $50.95 $50.95 $48.80 $50.95

Page 9 of 51 ends
← All documents from this meeting