5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of Two Million Five Hundred Thousand Dollars ($2,500,000.00), unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement

BKF ENGINEERS

Page 3 of 14 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises.

Sheila Amparo, Senior Project Manager/Associate, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

Professional Services Agreement

BKF ENGINEERS

Page 4 of 14 ends

12. INDEPENDENT CONTRACTOR

12.1 Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City.

12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.3 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

12.4 The Parties further acknowledges the following: (i) that Consultant shall provide the services outlined in the Scope of Services directly to City; (ii) Consultant maintains a business location at the address listed under Section 20 that is separate and distinct from the City; (iii) Consultant contracts with other businesses to provide the same or similar services and maintains a clientele without restriction from the City; (iv) Consultant advertises and holds itself out to the public as available to provide the same or similar services; (v) unless otherwise specified in this Agreement, Consultant provides its own tools, vehicles, and equipment necessary for performing the Scope of Services; (vi) Consultant has proposed and negotiated its own rates; and (vii) consistent with the nature and demands of the project and the City’s business hours, Consultant may set its own hours and location of work.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
Professional Services Agreement

BKF ENGINEERS

Page 5 of 14 ends

No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

Professional Services Agreement

BKF ENGINEERS

Page 6 of 14 ends

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

16. INSURANCE
Professional Services Agreement

BKF ENGINEERS

Page 7 of 14 ends

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

16.2 Consultant shall require each of its subconsultants, if any, to maintain Professional Services Agreement

BKF ENGINEERS

Page 8 of 14 ends

insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

Professional Services Agreement

BKF ENGINEERS

Page 9 of 14 ends

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20. NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

Professional Services Agreement

BKF ENGINEERS

Page 10 of 14 ends

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Chris Rideout, Principal/Vice
President
BKF Engineers
4675 MacArthur Ct, Suite 400
Newport Beach, CA 92660
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Professional Services Agreement

BKF ENGINEERS

Page 11 of 14 ends

Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has Professional Services Agreement

BKF ENGINEERS

Page 12 of 14 ends

the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
Professional Services Agreement

BKF ENGINEERS

Page 13 of 14 ends

In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.

Professional Services Agreement

BKF ENGINEERS

Page 14 of 14 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”

CITY OF PICO RIVERA BKF ENGINEERS
______________________________ ___________________________________ Andrew C. Lara, Mayor Chris Rideout, Principal/Vice President Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney

EXHIBIT A

SCOPE OF SERVICES

CITY OF PICO RIVERA

PROPOSAL FOR ON-CALL ENGINEERING SERVICES
FEBRUARY 14, 2024
BKF Engineers
4675 MacArthur Court, Suite 400
Newport Beach CA 92660
www.bkf.com
Contact
Chris Rideout, PE
(949) 526-8462
[email protected]

TABLE OF CONTENTS
LETTER OF OFFER ..............................................................................................................................................1 QUALIFICATIONS OF THE FIRM.................................................................................................................... 3 PROPOSED STAFFING ...................................................................................................................................... 7 KEY PERSONNEL RESUMES ...........................................................................Not included in Page Count CONSULTANTS AND/OR SUB-CONSULTANTS .........................................................................................8 WORK APPROACH........................................................................................................................................... 14 CLIENT REFERENCES......................................................................................................................................24 SCHEDULE OF HOURLY RATES....................................................................................................................26 EXCEPTIONS OR ADDITIONS.......................................................................................................................30 BKF Engineers
4675 MacArthur Court Suite 400
Newport Beach CA 92660 – 949-526-8462
Chris Rideout, PE [email protected]
CA Secretary Business Entity:

California Corporation, Date: 5/26/1970
Entity Number: C0599256

CONTACT INFORMATION

LETTER OF OFFER
City of Pico Rivera
Proposal for On-Call Engineering Services 1
February 14, 2024
Noe Negrete, PE
Director of Public Works
City of Pico Rivera
6615 Passons Blvd.

Pico Rivera, CA 90660
SUBJECT: CITY OF PICO RIVERA | LETTER OF OFFER

REQUEST FOR PROPOSALS ON-CALL ENGINEERING SERVICES
Dear Mr. Negrete,
The City of Pico Rivera has set forth a comprehensive long-term vision aimed at revitalizing and sustaining a thriving community through the implementation of projects and programs along major corridors. These initiatives are designed to enhance connectivity, promote safety, and foster an equitable, sustainable environment. BKF Engineers has proudly worked alongside the City for over five years on various projects, including the Washington Bridge, Pico Rivera Bikeway Project, and the Historic Whittier Boulevard Feasibility Study, establishing ourselves as an integral partner to the community. The Pico Rivera Bikeway Project is currently in the construction phase. The BKF Team has done multiple public outreach, meetings, and bike rides for this Project, where we had the opportunity and pleasure of meeting City staff and residents.

We recognize the importance of aligning with the City’s objectives and understand the needs of its residents, we are eager to submit our proposal for On-Call Engineering Services for the City’s consideration to continue serving the City and its residents.

ABOUT US. BKF is a full-service consulting engineering and survey firm with more than 108 years of experience in public works engineering. BKF’s decades of engineering, surveying, and planning experience is evident in our legacy projects throughout the West Coast. By leveraging our diverse project portfolio in combination with innovative design solutions, BKF’s team of more than 450+ experienced staff is dedicated to successfully delivering sustainable projects for our communities.

EXPERIENCED TEAM. Our Team members have recently worked on typical capital improvement projects including intersection/mobility, beautification projects and roadway design such as the Yorba Linda Boulevard Widening Project, Los Alisos/Muirlands Improvements Project, Harvard/ Michelson Intersection Improvement Project, Trabuco/Remington Intersection Improvement Project, Lakewood/Florence Intersection Widening, Pico Rivera Regional Bikeway Project, and Jeffrey/Walnut Intersection Improvement Project. We have included the same team working on these similar projects to ensure continuity and to streamline project deliverables. We included our hand-picked team of trusted subconsultants that we have worked alongside for over a decade to bring value to the City and its partners.

LETTER OF OFFER
City of Pico Rivera
Proposal for On-Call Engineering Services 2
NAME
ROLE

PROJECT

CONTACT

PRIME CONSULTANT
BKF Engineers
Civil Engineering, Survey Chris Rideout, PE | [email protected]

SUBCONSULTANT
MIG
Lanscape Architecture Steve Lang | [email protected]
Earth Mechanics, Inc. (EMI)
Geotechnical Engineering Alahesh Thurairajah | [email protected] LSA
Environmental Deborah Pracilio | [email protected] Monument
Right of Way Acquisition Amber Costello | [email protected] Ninyo & Moore
Geotechnical Engineering Michael Putt | [email protected] RMA Group
Utility Locating Slawek Dymerski | [email protected] Stantec
Traffic Engineering Keith Rutherfurd | [email protected] Vicus Planning
Environmental Planning Monica Villalobos | [email protected] STATEMENTS. This Proposal shall remain valid for a period of not less than 90 calendar days from the date of submittal of February 14, 2024. As Principal and Vice President, I have full signing authority and am authorized to bind to the terms and conditions of this proposal and can confirm that the information submitted within this proposal is true and correct. Our Team has reviewed the City’s Agreement provided in the RFP, and while we can accept the Agreement, we have made edits/revisions for the City’s review and consideration, which are included in the appendices section of our proposal.

I am available to expand on any portion of our proposal. Please feel free to contact me during the selection process at (949) 526-8462. We eagerly anticipate the opportunity to maintain our partnership with the City of Pico Rivera.

Sincerely,
BKF Engineers
Chris Rideout, PE Sheila Amparo, PE, QSP/D
Principal/Vice President Senior Project Manager/Associate

QUALIFICATIONS OF THE FIRM
City of Pico Rivera
Proposal for On-Call Engineering Services 3
Delivering Inspired Infrastructure for over 108 years
Since 1915, BKF Engineers earned a reputation for its ability to successfully plan, design, survey, and implement complex projects. We draw upon and utilize our experience diligently guiding projects from the initial due diligence and feasibility stages, progressing project designs and permitting approvals, and concluding with construction and implementation. This proven approach recognizes that developing dynamic projects is informed by focused team collaboration, mitigating physical constraints and potential risks, and balancing designs goals with value engineering solutions.

Through our network of 16 west coast offices, BKF provides civil engineering, land surveying, and land planning services for government agencies, institutions, developers, design professionals, contractors, Utility and Flood Control District, school districts, and corporations. Facilitating the unique permitting and expertise requirements of projects, we provide a number of specialty services, including Agency permit expediting, sustainable infrastructure, site accessibility consulting, hydrology/hydraulics, traffic signal and traffic handling designs, utility locating services, automated construction surveying monitoring, and 3D laser scanning.

BKF Engineers

FIRM PROFILE
450+
Employees
Founded in
1915
16 West Coast
Offices
160
Professional
Engineers &
Surveyors

FIRM INFORMATION
Services Provided
▪ Civil Engineering
▪ Surveying
▪ Planning
▪ Transportation
▪ Water Resources
▪ Construction Management
▪ Utility Locating
Office Locations
▪ Newport Beach
▪ San Diego
▪ Oakland
▪ Redwood City
▪ San Jose
▪ Walnut Creek
▪ Pleasanton
▪ Santa Rosa
▪ Sacramento
▪ San Francsico
▪ San Rafael
▪ Modesto
▪ Roseville
▪ Salinas
▪ San Luis Obispo
▪ Portland, OR
Form of Organization California Corporation | 05/26/1970 | Entity No. C0599256

QUALIFICATIONS OF THE FIRM
City of Pico Rivera
Proposal for On-Call Engineering Services 4

CLIENT PROJECT TITLE CONTACT
City of
Pico Rivera
▪ Pico Rivera Regional Bikeway
▪ Telegraph Road Bridge
▪ Mines Avenue Parking Study
▪ Whittier Boulevard Bridge
Feasibility Study
Kenner Guerrero
Associate Engineer
(562) 801-4351
[email protected]
City of Anaheim
Public Utilities
Department
▪ APUD As-Needed Civil Services FY
2023-28
▪ APUD GSA #5, FY 22/23, Civil Base
Maps for Street Light Improvements
▪ APUD GSA #4, FY 22/23, Park
Substation Line
Vinh Tran
Senior Electrical Engineer
(714) 765-4273
[email protected]
City of
Buena Park
▪ Altura Pavement Rehabilitation Project
▪ Rosecrans Pavement Rehab Project
Teddy Luong, PE
Assistant Engineer
(714) 562-3689
[email protected]
City of Chino
▪ 2023 Civil Engineering On-Call
▪ Benson Avenue Storm Drain Extension
▪ Russell Ave. Waterline Replacement
James Pagani
Construction Manager
(626) 863-3232
[email protected]
City of
Costa Mesa
▪ Costa Mesa On-Call
Engineering Services
▪ Costa Mesa Sound Walls
▪ Costa Mesa Paularino Channel
Arash Rahimian, PE, QSD
Senior Engineer
(714) 754-5096
arash.rahimian@
costamesaca.gov
City of Downey
▪ Downey On-Call Civil Engineering
▪ Florence Avenue Bridge Over Rio
Hondo Channel Rehabilitation Project
▪ Downey 5 Parks Project
▪ Lakewood Florence Intersection
Desi Gutierrez, PE
Former Principal Civil
Engineer (Retired)
(562) 271-3188
City of Irvine
▪ Irvine Consultant Team 2023-2026
▪ Hicks Canyon Wash H&H Study
▪ Jamboree/Barranca Intersection Imp.
▪ Jeffrey/Walnut Intersection Imp.
▪ Trabuco/Remington Traffic Signal
▪ PR/ED for Jamboree/Main Intersection
Tran Tran, PE
Former Sr. Transportation
Engineer (now with City
of Lake Forest)
(949) 461-3485
[email protected]

SUMMARY OF SIMILAR PROJECTS

FIRM INFORMATION
Financial Condition
BKF has more than 100 years of being financially conservative and is in excellent financial condition. We have been audited by several public agencies and have always been in compliance with generally accepted accounting practices.

QUALIFICATIONS OF THE FIRM
City of Pico Rivera
Proposal for On-Call Engineering Services 5

BKF ENGINEERSEARTH MECHANICS INCLSAMIGMONUMENTNINYO & MOORESITESCANSTANTECVICUS PLANNING Pico Rivera Regional Bikeway X X X
Mines Avenue Traffic Study X X
Brea Country Hills Pavement Rehab X X
Del Amo Storm Drain Channel, I-196 X X X X
Harvard/Michelson Intersection Improv. X X X
Jeffrey Walnut Intersection Improvement X X
Jeffrey Open Space Trail X X X
PR/ED for Jamboree/Main Intersection X X X
Trabuco/Remington Traffic Signal X X X
Los Alisos Blvd./Muirlands Blvd. Intersection X X X X
Yorba Linda Blvd. Improvements X X X X
Shaw Avenue Roadway Improvements X X
Euclid Avenue Bridge Replacement X X X
Herndon OL Valentine to Marks X X
Costa Mesa Paularino Channel X X X
Chino On-Call Civil Engineering X X X X
El Rivino Road @ Agua Mansa Road X X
BKF Engineers has served the City of Pico Rivera for the past six (6) years, and will continue to serve the City to the best of our abilities when given the opportunity. We have purposefully selected and invited our subconsultants that we have partnered with nearly ten (10) years, and a couple of new partners like Monument and Vicus Planning. The BKF Team has decades of industry experience with cities and agencies, similar to the City of Pico Rivera, and we are eager to bring forth the expertise and capabilities our team offers to you.

SUMMARY OF PROJECTS WITH OUR SUBCONSULTANTS
* Projects in BOLD are off of an On-Call Contract

QUALIFICATIONS OF THE FIRM
City of Pico Rivera
Proposal for On-Call Engineering Services 6
BKF Engineers and our subconsultants see to it that to the extent within our control, the personnel proposed to work on this project shall remain available to the project for the full term of the contract and if a personnel change becomes necessary, the City shall have approval authority of any proposed new personnel.

In addition, BKF has the resources available to provide additional experienced personnel, office support, and field staff should that need arise. The table below illustrates key personnel current assignments and the allocation percentage each key member is committed to the City.

TEAM ALLOCATION + AVAILABILITY

KEY BKF STAFF ASSIGNED CURRENT ASSIGNMENTS COMMITMENT

TO THE CITY
Chris Rideout, PE
BKF Engineers
▪ Rancho Palos Verdes Landslide
Program Manager
▪ Lake Forest Los Alisos/ Muirlands
▪ Irvine Jeffrey Open Space Trail
30 %
Sheila Amparo, PE, QSD
BKF Engineers
▪ Lake Forest Los Alisos/ Muirlands
▪ Irvine Jeffrey Open Space Trail
▪ IBC Multi-Use Trail along Creekwalk &
Barranca Channel
45 %
Jason Kirchmann,

PE, PLS, QSD
BKF Engineers
▪ SMART Bridge Hydraulic Analysis
▪ Herndon Avenue Repair
▪ Marin County As-Needed Hydrology
and Hydraulics
25 %
Dan Villines, PE, QSD
BKF Engineers
▪ Del Amo Channel, Torrance
▪ Montalvo Storm Drain, San Clemente
▪ Kern River Hatchery Siphon, CA Dept. of
General Services
35 %
Roger Chung, PE, CFM,

ENV SP, QSD/QSP
BKF Engineers
▪ Rancho Palos Verdes Landslide
Program Manager
▪ Crest Road Wall Improvements, Rancho
Palos Verdes
▪ Line J-1 Channel Improvements, Lancaster
45 %
Nate Parker, PLS
BKF Engineers
▪ Park Place Extension, El Segundo
▪ Kaiser ED Expansion, Baldwin Park
▪ Culverdale Elementary School, Irvine
40 %

QUALITY CONTROL
Jason Kirchmann, PE, PLS,
QSD
QA/QC Manager

BKF ENGINEERS

PROPOSED STAFFING
City of Pico Rivera
Proposal for On-Call Engineering Services 7

ORGANIZATIONAL CHART

PROJECT MANAGEMENT
Chris Rideout, PE
Principal in Charge

BKF ENGINEERS
Sheila Amparo, PE, QSD
Project Manager

BKF ENGINEERS
Bobby Lin, PE
Deputy Project Manager

BKF ENGINEERS
Michael Buccelli, EIT
Civil Team

BKF ENGINEERS
Kevin Wakayama, EIT
Civil Team

BKF ENGINEERS
Dan Villines, PE, QSD
Drainage Task Lead

BKF ENGINEERS
Roger Chung, PE, QSD
Water Resources Task Lead

BKF ENGINEERS
Robin Hayes, PE
Water Resources Team

BKF ENGINEERS
Nate Parker, PLS
Survey Task Lead

BKF ENGINEERS
Grady Roth, LSIT
Survey Team

BKF ENGINEERS
Travis Freitag
Survey Team

BKF ENGINEERS
Deborah Pracilio
Environmental Task Lead
LSA
Alahesh Thurairajah, PE
Geotechnical Task Lead
EARTH MECHANICS, INC.

Michael Putt, PG, CEG
Geotechnical Task Lead

NINYO & MOORE
Steve Lang, PLA
Landscape/Outreach Task Lead
MIG
BJ Swanner
Right of Way Task Lead

MONUMENT
Keith Rutherfurd, PE, TE
Traffic Engineering Task Lead

STANTEC
Monica Villalobos
Urban Planning Task Lead
VICUS
Slawek Dymerski, PE, GE
Utility Locating + Potholing Task Lead

RMA GROUP

AS-NEEDED SUBCONSULTANT TEAM

PROJECT TEAM
The organizational chart presented below displays our proposed team organization, depth of resources, and coordination between team members available to the City of Pico Rivera.

By assigning seasoned engineers and surveyors, BKF will assure a thorough work product, a cross-pollination of design expertise, and effective management of the project as necessary.

City of Pico Rivera

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

CHRIS RIDEOUT, PE

PRINCIPAL IN CHARGE
Chris Rideout has more than 37 years of design experience on numerous streetscape, roadway, utility infrastructure, and municipal improvement projects. He has been able to develop strong relationships with the local and regional approval agencies throughout his career, which helps with obtaining timely jurisdictional approvals. His strengths include providing creative alternatives with a maximum amount of flexibility during the design, while maintaining the project objectives and schedule.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Civil
Engineering,
California Polytechnic
University, Pomona

REGISTRATION
Professional Civil
Engineer CA No.
44922

AFFILIATIONS
American Public
Works Association -
Member

TOTAL YEARS

EXPERIENCE
37 years
Pico Rivera Regional Bikeway
Pico Rivera, CA
Chino Hills Parkway Rehabilitation Projects
Chino Hills, CA
Chino Hills On-Call Engineering
Chino Hills, CA
Los Alisos Blvd./Muirlands Blvd. Intersection
Improvements Project
Lake Forest, CA
South Gate Residential Resurfacing I&II
South Gate, CA
South Gate E. Frontage Road Pavement Rehabilitation
South Gate, CA
Altura Pavement Rehabilitation Project
Buena Park, CA
Rosecrans Pavement Rehabilitation Project
Buena Park, CA
PR/ED for Jamboree/Main Intersection Enhancements
Irvine, CA
Jeffrey Open Space Trail (JOST) Extension
Irvine, CA
Trabuco/Remington Traffic Signal
Irvine, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

SHEILA AMPARO, PE, QSD

PROJECT MANAGER
Sheila has over 24 years of civil engineering experience in roadway design, grading, and highway/bridge projects with municipal agencies, as the project engineer, design manager, and project manager. Sheila has lead the design efforts for roadway geometrics, grading, signing and striping, stage construction and traffic handling. She will oversee all the geometric design, and ensure that coordination among the team members are consistent and clear.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Civil
Engineering,
California Polytechnic
University, Pomona

REGISTRATION
Professional Civil
Engineer CA No.
78003

AFFILIATIONS
Qualified SWPPP
Developer (QSD) &
Practitioner (QSP)
CA No. 26297

TOTAL YEARS

EXPERIENCE
24 years
Pico Rivera Regional Bikeway
Pico Rivera, CA
Whittier Bridge Study
Pico Rivera, CA
Central Avenue Grade Separation Project
Montclair, CA
Euclid Avenue Bridge Replacement Project
Chinio, CA
Pavement Reconstruction & Rehabilitation on Phillips Blvd.

San Bernardino, CA
Chino Hills Parkway Rehabilitation Projects
Chino Hills, CA
Los Alisos Blvd./Muirlands Blvd. Intersection Improv.

Lake Forest, CA
South Gate Residential Resurfacing I&II
South Gate, CA
South Gate E. Frontage Road Pavement Rehabilitation
South Gate, CA
Altura Pavement Rehabilitation Project
Buena Park, CA
Jeffrey Open Space Trail (JOST) Extension
Irvine, CA
Trabuco/Remington Traffic Signal
Irvine, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

JASON KIRCHMANN, PE, PLS

QUALITY ASSURANCE/QUALITY CONTROL MANAGER
Jason has a wide variety of experience in civil engineering design and land surveying for local municipalities and private sector clients. He has provided design support and project management on civic, healthcare, residential, education, parks, and commercial projects. Jason has been responsible for surveying tasks related to the design and construction of transportation, residential, commercial and public works projects. He understands the importance of providing seamless coordination with clients, other professional consultants, and reviewing agencies. He brings a keen sense of urgency to projects, consistently demonstrating the ability to stay on schedule and within budget.

SELECT PROJECT EXPERIENCE

EDUCATION
Civil Engineering,
Surveying and
Technology (CEST)
Program, Santa Rosa
Jr. College

REGISTRATIONS
Professional Civil
Engineer CA No.
78079, Professional
Surveyor CA No.
8806

TOTAL YEARS

EXPERIENCE
21 years
City of San Rafael On-Call Engineering
San Rafael, CA
City of American Canyon On-Call Engineering
American Canyon, CA
Town of Corte Madera On-Call Engineering
Corte Madera, CA
City of Sausalito On-Call Engineering
Sausalito, CA
City of Santa Rosa On-Call Engineering
Santa Rosa, CA
Alameda County GSA On-Call Engineering
Alameda County, CA
San Francisco As-Needed Architectural Services
San Francisco, CA
West Sac On-Call Survey (2021-24)
West Sacramento, CA
Sacramento County On-Call Land Surveying Services
Sacramento, CA
City of San Rafael Survey and Plan Check
San Rafael, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

BOBBY LIN, PE

DEPUTY PROJECT MANAGER
Bobby brings more than 14 years of experience delivering public works engineering and transportation design projects.

His expertise includes civil transportation design for roadway, intersection improvement and enhancements, mobility and connectivity projects, widenings, and safety improvement projects. His ability to effectively communicate and manage projects and coordinate with stakeholders is keen. In addition to working with public and government agencies, he has also worked with municipality projects under Caltrans guidelines.

Bobby will work alongside the Project Manager to ensure project deliverables are met.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Civil
Engineering;
University of
California, Irvine

REGISTRATIONS
Registered
Professional
Engineer, CA, No.
85563

TOTAL YEARS

EXPERIENCE
14 years
Pico Rivera Regional Bikeway
Pico Rivera, CA
Pavement Reconstruction and Rehabilitation on Phillips
Boulevard
Chino/Montclair, CA
Chino Hills Parkway Rehabilitation Projects
Chino Hills, CA
South Gate Residential Resurfacing I&II
South Gate, CA
South Gate E. Frontage Road Pavement Rehabilitation
South Gate, CA
Downey Lakewood/Florence Intersection Improvement
Downey, CA
Yorba Linda Blvd./Imperial Hwy. Intersection Improv.

Yorba Linda, CA
#D034 El Rivino Rd @ Agua Mansa Rd
Bloomington, CA
Central Avenue Grade Separation Project
Montclair, CA
Harvard/Michelson Intersection Improvements
Irvine, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

DAN VILLINES, PE, QSD

WATER RESOURCES MANAGEMENT LEAD
Dan offers more than 31 years of professional civil engineering experience in the technical field of water resources. His experience includes hydraulic and structural analyses for the preparation of design plans, specifications and cost estimates for retaining walls, flood walls, dams, detention basins, water supply, wastewater, and flood control facilities.

Dan has performed plan-check services for public agencies to verify hydrology and hydraulic design considerations. He has extensive knowledge of computer based hydraulic models for both open canal and piping systems for the purpose of determining cost effective and efficient hydraulic conveyance systems. Dan has been involved in the structural analysis, design, and construction of several hydraulic based projects in Southern California.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Civil
Engineering,
California Polytechnic
University, Pomona

REGISTRATIONS
Registered
Professional
Engineer, CA, No.
55210

AFFILIATIONS
Hydrology and
Hydraulic Technical
Group
American Society of
Civil Engineers

TOTAL YEARS

EXPERIENCE
31 years
Pico Rivera Regional Bikeway
Pico Rivera, CA
Benson Avenue Storm Drain Extension
Chino CA
Pavement Reconstruction & Rehabilitation on Phillips Blvd.

San Bernardino, CA
Via Montego Storm Drain Extension
San Clemente, CA
Galaxy Drive Emergency Storm Drain Repair
Newport Beach, CA
Del Amo Storm Drain Channel, I-196
Torrance, CA
Jeffrey Open Space Trail (JOST) Extension
Irvine, CA
Harvard/Michelson Intersection Improvements
Irvine, CA
Downey Lakewood/Florence Intersection Improvement
Downey, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

ROGER CHUNG, PE, CFM, ENV SP, QSD/QSP

WATER RESOURCES PROJECT MANAGER
Roger has more than 23 years of civil engineering experience with expertise in hydrology, hydraulic and structural analysis for the preparation of drainage studies, drainage master plans and the preparation of design plans, specifications, and cost estimates for water supply and flood control facilities.

He has been involved in the hydraulic analysis and design of numerous water recharge and flood control projects in San Bernardino, Riverside, Orange, Los Angeles, and San Diego County including coastal cities.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Environmental
Engineering,
University of
California, Irvine
B.S., Civil
Engineering,
University of
California, Irvine

REGISTRATION
Professional Civil
Engineer, CA No.
65388
Qualified Stormwater
Pollution Prevention
Plan Developer &
Practitioner (QSD/
QSP) #20600
Certified Floodplain
Manager #US-19-
11182, Association
of State Floodplain
Managers
Envision
Sustainability
Professional (ENV
SP) #43157

TOTAL YEARS

EXPERIENCE
23 years
Washington Boulevard Bridge Project
Pico Rivera, CA
Benson Avenue Storm Drain Extension
Chino CA
Chino On-Call Civil Engineering, 2020 - 2021
Chino, CA
County of San Bernardino Carbon Canyon Channel
Improvements
Chino Hills, CA
South Gate Residential Resurfacing I&II
South Gate, CA
Jeffrey Open Space Trail (JOST) Extension
Irvine, CA
Harvard/Michelson Intersection Improvements
Irvine, CA
Los Alisos Blvd./Muirlands Blvd. Intersection
Improvements Project
Lake Forest, CA
Yorba Linda Blvd./Imperial Hwy. Intersection Improv.

Yorba Linda, CA
Kingsdale Avenue Resurfacing
Redondo Beach , CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

NATE PARKER, PLS

SURVEY PROJECT MANAGER
Nate Parker has over 20 years of experience in field
surveying. He is a registered Professional Land Surveyor.

His project experience covers all aspects of field surveys including boundary, topographic, ALTA surveys; settlement and movement studies; and construction surveys involving subdivisions, high-rise buildings, bridges, grade separations, highways, utility layout, railroad layout, port surveys and airports. He handles all aspects of boundary, control,
construction and topographic data collection.

SELECT PROJECT EXPERIENCE

EDUCATION
Surveying, Santiago
Canyon College,
Orange, CA

REGISTRATIONS
Professional Land
Surveyor CA No.
9813

TOTAL YEARS

EXPERIENCE
20 years
Pico Rivera Regional Bikeway
Pico Rivera, CA
Benson Avenue Storm Drain Extension
Chino, CA
Russell Avenue Water Main Line Replacement
Chino, CA
Pavement Reconstruction and Rehabilitation on Phillips
Boulevard
San Bernardino, CA
Chino Hills Parkway Rehabilitation Projects
Chino Hills, CA
Los Alisos Blvd./Muirlands Blvd. Intersection
Improvements Project
Lake Forest, CA
South Gate Residential Resurfacing I&II
South Gate, CA
Altura Pavement Rehabilitation Project
Buena Park, CA
Rosecrans Pavement Rehabilitation Project
Buena Park, CA
Jeffrey Open Space Trail (JOST) Extension
Irvine, CA
Trabuco/Remington Traffic Signal
Irvine, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

SUBCONSULTANT RESUMES

DEBORAH PRACILIO
LSA ASSOCIATES, INC. | ENVIRONMENTAL PLANNING
Deborah is an expert in the Environmental Assessment
processing procedures for NEPA and CEQA. With more
than 30 years of experience, she has been responsible for project oversight as Principal in Charge and preparation and project management of CEQA- and NEPA-mandated
environmental documents for land use, institutional, and capital improvement projects, as well as for numerous
controversial transportation and land use projects. Deborah brings her substantial experience with transportation projects and extensive knowledge of FHWA and Caltrans requirements and procedures to projects. She is also experienced with federal and State resource/regulatory requirements related to protection of environmental resources.

SELECT PROJECT EXPERIENCE

EDUCATION
B.A., Social Ecology,
University of
California, Irvine

AFFILIATIONS
American Planning
Association
Women’s
Transportation
Seminar

TOTAL YEARS

EXPERIENCE
38 years

AVAILABILITY TO

PICO RIVERA
30 %
Caltrans District 12, On-Call Environmental Services
Orange County, California
San Gabriel Valley Council of Governments, Alameda
Corridor-East Construction Authority, On-Call Services
Los Angeles, CA
Caltrans District 7, On-Call Environmental Services (I-5 Corridor from Kern County to the Orange County Line
and Los Angeles County, Central Area)
Los Angeles County, CA
Caltrans District 7, South of I-10 On-Call Environmental Services (Contract No. 07A1893)
Los Angeles, CA
Caltrans District 7, I-5 Widening EIR/EIS On-Call Services Los Angeles County, CA
County of Orange/OC Public Works, On-Call
Environmental Services
Orange County, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

ALAHESH THURAIRAJAH, PE, GE
EARTH MECHANICS, INC. | GEOTECHNICAL ENGINEER
Alahesh is a geotechnical principal/project manager
with 14 years of experience on California transportation projects. He has provided geotechnical design/construction recommendations for 250+ bridges including 15 HBP bridges, 300+ standard and non-standard retaining walls, and 100+ miles of roadway. He has prepared Foundation Reports and Geotechnical Reports in compliance with Caltrans standards for numerous bridge/roadway projects.

SELECT PROJECT EXPERIENCE

EDUCATION
M.S., Civil
Engineering,
University of
California, Los
Angeles
B.S., Magna
Cum Laude, Civil
Engineering,
California State
Polytechnic
University, Pomona

REGISTRATIONS
Professional Civil
Engineer CA No.
81439
Professional
Geotechnical
Engineer CA No.
3123

TOTAL YEARS

EXPERIENCE
14 years

AVAILABILITY TO

PICO RIVERA
40 %
Venta Spur Bicycle-Pedestrian Bridge
Irvine, CA
WB SR-91 from Shoemaker Avenue to Alondra Blvd (PAED and PS&E) Los Angeles County, CA
Rosecrans/Marquardt Grade Separation Project
Santa Fe Springs, CA
Pacific Ave. Pedestrian and Bicycle Improvements Project Jurupa Valley, CA
I-605/Katella Avenue Interchange Improvement Project
Orange County, CA
Centennial Corridor Project, Design Package 2
Bakersfield, CA
SR-178/Morning Drive Interchange
Bakersfield, CA
7th Street Bridge Replacement over Tuolumne River
Stanislaus County, CA
Washington Street Bridge Seismic Rehabilitation
Petaluma, CA
I-605/I-5 Interchange (PA-ED), LA Metro
Los Angeles County, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

MICHAEL PUTT, PG, CEG
NINYO & MOORE | GEOTECHNICAL ENGINEER
Michael is a Principal Geologist with Ninyo & Moore and has extensive experience in providing engineering geology consultation in Southern California. Michael has extensive experience on a variety of project types, including highways, bridges, bore and jack tunneled undercrossings, hillside and flat-land mass grading projects for residential, commercial, and industrial developments, pipelines, and forensic investigations.

Mr. Putt performs project administration and management, prepares and reviews geologic and geotechnical reports and provides third party review services for geotechnical reports.

He conducts geologic and geotechnical field evaluations, including detailed logging of large- and small-diameter borings and trenches, and geologic evaluation/mapping.

Projects have included fault hazard evaluations, landslide studies, slope stability analysis, seismic refraction studies, geologic reconnaissance studies, forensic evaluations, and construction and inspection services.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Geology,
California State
University, Fullerton

REGISTRATIONS
Professional
Geologist, CA No.
7581
Certified Engineering
Geologist, CA No.
2341

TOTAL YEARS

EXPERIENCE
27 years

AVAILABILITY TO

PICO RIVERA
80 %
On-Call Geotechnical Engineering Services
Diamond Bar, CA
On-Call Geotechnical Third-Party & Plan Review Services Orange County, CA
On-Call Geotechnical Services and Plan Review Services
Rancho Santa Margarita, CA
On-Call Geotechnical and Third-Party Review Services
Jurupa Valley, CA
On-Call Consulting Support for Public Works
Development Services
Anaheim, CA
On-Call Professional Services
Corona, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

STEVE LANG, PLA
MIG, INC. | LANDSCAPE ARCHITECT
Steve is an award-winning landscape architect who has
dedicated his career to creating outdoor environments that offer memorable, positive connections for people to each other and to nature. His early artistic talents converged with his love for the spaces beyond building walls to forge a 40-year vocation. Licensed in four states, Steve’s work can be found around schools and sports fields, in forests and downtowns, through plazas and parks and along streets and waterways.

He believes there is a deeper story to every project, and he strives to bring it to the surface through interpretation, education and art.

SELECT PROJECT EXPERIENCE

EDUCATION
B.A., Landscape
Architect, UC
Berkeley

REGISTRATIONS
Professional
Landscape Architect,
CA No. 1771
Professional
Landscape Architect,
Nevada No.461

TOTAL YEARS

EXPERIENCE
27 years

AVAILABILITY TO

PICO RIVERA
80 %
Pine Avenue Streetscape Improvements
Long Beach, CA
Firestone Boulevard Streetscape Improvements
Downey, CA
Long Beach Transit Gallery
Long Beach, CA
Beverly Boulevard
Pico Rivera, CA
Yorba Linda City-Wide Transitional Median Landscape
Yorba Linda, CA
Firestone Boulevard Streetscape
Apollo, Golden, Dennis the Menace, and Wilderness
Parks Renovation
Downey, CA
Santa Ana Dog Park at Centennial Park
Santa Ana, CA
Ponderosa Park and Family Center
Anaheim, CA
Anaheim Coves Phase I and II
Anaheim, CA
Anaheim Urban Greening
Anaheim, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

BJ SWANNER
MONUMENT ROW | RIGHT OF WAY SUPPORT SERVICES
BJ has over 16 years of experience managing right-of-way programs for a variety of public infrastructure projects from small to large. He has demonstrated experience
managing projects, as well as developing and implementing technological solutions to real estate challenges utilizing GIS and other systems. Throughout his career, BJ’s focus has been on supporting engineers and planners during the preacquisition phases of project development. As a recognized leader in the Southern California right-of-way profession, he is knowledgeable about local markets and infrastructure, and has relationships with key stakeholders in the region.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Geography, GIS,
and Remote Sensing,
UCLA

TOTAL YEARS

EXPERIENCE
16 years

AVAILABILITY TO

PICO RIVERA
50 %
Inglewood Transit Connector
Inglewood, CA
Sepulveda Pass Transit (Tunnel), Los Angeles County
Metropolitan Transportation Authority
Los Angeles, CA
Arroyo Seco Parkway Safety Enhancement Project,
Caltrans District 7
Pasadena, CA
PA&ED, PS&E, and Utility Investigation for I-105 Express Lanes, Los Angeles County Metropolitan Transportation
Authority
Los Angeles, CA
Nogales Street South Grade Separation, San Gabriel
Valley Council of Governments and Alameda Corridor
East Program
Industry, CA
Los Angeles River Valley Bikeway and Greenway Design
Completion Project
Los Angeles, CA
SR-710 North Study, Los Angeles County Metropolitan
Transportation Authority
Los Angeles, CA
Valley View Grade Separation, City of Santa Fe Springs
Santa Fe Springs, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

KEITH RUTHERFURD, TE
STANTEC | TRANSPORTATION ENGINEERING
Keith offers 38 years of transportation and traffic
engineering experience with a comprehensive background
in transportation analysis and design plan preparation. He performs technical analyses and studies, prepares various reports, and designs improvement plans for numerous
public works projects. Specific transportation engineering experience includes road alignment studies; highway and street improvements design, including geometric studies, interchanges, and ramps; traffic engineering, including site impact studies, parking and bikeway studies, bus operations, signing, striping, traffic signal, and traffic control plan design.

SELECT PROJECT EXPERIENCE

EDUCATION
B.S., Administrative
Studies, University of
California, Riverside
M.S., Civil/
Transportation
Engineering,
University of
California, Irvine

REGISTRATIONS
Professional Traffic
Engineer, CA No.

TR 1647

TOTAL YEARS

EXPERIENCE
38 years

AVAILABILITY TO

PICO RIVERA
40 %
Mines Avenue Regional Bikeway
Pico Rivera, CA
Telegraph Road Traffic Throughput and Safety
Enhancements Project
Downey/Pico Rivera, CA
Lakewood Boulevard Improvements Phases 3B and 3C
Downey, CA
Jamboree Road/Main Street Intersection Enhancements
Traffic Analysis
Irvine, CA
University Dr./Ridgeline Dr. Traffic Engineering Services Irvine, CA
Ocean Avenue Protected Bikeway
Santa Monica, CA
Ceremony Traffic Calming and Pedestrian Crossing Safety Enhancements, PA 6 N5A
Irvine, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

MONICA VILLALOBOS
VICUS | ENVIRONMENTAL PLANNING
Monica’s unique experience includes work at the intersection of transportation, strategic planning, land use, environmental justice and award-winning community engagement strategies.

With 20 years of experience, she has a proven record as a technical expert and public engagement strategist on a variety of large-scale multidisciplinary transportation planning and policy projects. Over the course of her career, she has led several transit and station area planning projects for Metro.

She is experienced in construction management for transit and street projects. Her work in public relations includes Metro, cities, SCAG and SANDAG. She has worked closely
with key decision makers, community groups, stakeholders, elected officials, and the public to successfully plan, design and implement projects.

SELECT PROJECT EXPERIENCE

EDUCATION
Ph.D, City and
Regional Planning,
UC Berkeley
MRP, City and
Regional Planning,
Cornell University
BS, Community
and Regional
Development, UC
Davis

AFFILIATIONS
MPact, National
Steering Committee
(2016 – Present)
American Planning
Association, Chair,
National Latinos in
Planning Division
(2010 – 2016)

TOTAL YEARS

EXPERIENCE
20 years

AVAILABILITY TO

PICO RIVERA
40 %
Eastside Transit Corridor Phase 2
Los Angeles, CA
C Line (Green Line) Extension to Torrance
Los Angeles, CA
K Line Northern Extension
Los Angeles, CA
Rail-to-Rail Construction Management Support Services
Los Angeles, CA

KEY PERSONNEL RESUMES
City of Pico Rivera
Proposal for On-Call Engineering Services

SLAWEK DYMERSKI, PE, GE
RMA GROUP | UTILITY LOCATING + POTHOLING
Slawek has three decades of engineering experience, including 20 years in project and quality management. He has been involved in all aspects of field exploration and data analysis for a wide range of pavement evaluation, construction inspection, geotechnical exploration, and design projects involving materials tests on asphalt concrete, Portland cement concrete, masonry, soils, aggregates, and steel by DSA, Caltrans, ASTM, and AASHTO test methods. In a Quality Assurance role, Slawek will be responsible for verifying that our deliverables fully meet project requirements and provide technical quality review of all geotechnical reports and material tests. Most critically, he understands the importance of timely, accurate, and fully vetted geotechnical and testing information.

SELECT PROJECT EXPERIENCE

EDUCATION
Ph.D, City and
Regional Planning,
UC Berkeley
MRP, City and
Regional Planning,
Cornell University
BS, Community
and Regional
Development, UC
Davis

AFFILIATIONS
MPact, National
Steering Committee
(2016 – Present)
American Planning
Association, Chair,
National Latinos in
Planning Division
(2010 – 2016)

TOTAL YEARS

EXPERIENCE
30 years

AVAILABILITY TO

PICO RIVERA
30 %
Park to Playa Trail,
Los Angeles County
Los Angeles County Department of Public Works
Los Angeles, CA
I-405/Sepulveda Pass Improvements Project
Los Angeles, CA

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 8

SUBCONSULTANT FIRM QUALIFICATIONS

EARTH MECHANICS, INC
Firm Information
Address: 17800 Newhope Street, Suite B,
Fountain Valley, CA 92708
Phone Number: 714-751-3826
Key Personnel Contact Name: Alahesh Thurairajah
Project Function: Geotechnical Project Manager
Firm Profile
Founded as a California Corporation in 1989, Earth Mechanics, Inc. (EMI) is a geotechnical and earthquake engineering consulting firm specializing in major geotechnical site investigations and testing, seismic hazard and earthquake retrofit evaluations, and foundation design for projects related to transportation infrastructure including bridges, roadways, freeways, and tunnels. With a staff of 38, EMI has offices located throughout California. The headquarters is in Fountain Valley, California in Orange County. Other offices are in Hayward, Corona, San Marcos, and San Bernardino. For this contract, work will be led from the Fountain Valley office, which has a Caltrans-certified soil testing laboratory and rock laboratory.

Relevant Project
Experience
▪ Rosecrans/Marquardt Grade Separation
▪ Venta Spur Bicycle/Pedestrian Trail
▪ WB SR-91 from Shoemaker Ave. to Alondra Blvd. Improvements ▪ City of Los Angeles Bridge/Civil On-Call Contracts

LSA ASSOCIATES, INC
Firm Information
Address: 3210 El Camino Real, Suite 100, Irvine, CA 92602 Phone Number: 949-553-0666
Key Personnel Contact Name: Deborah Pracilio
Project Function: Principal/Environmental Planning
Firm Profile
LSA Associates, Inc. (LSA) is a multidisciplinary environmental consulting firm with more than 47 years of experience in helping public- and privatesector clients navigate the often-complex process of environmental review. Founded in 1976, LSA has nine offices in California with a total staff of approximately 180 full-time employees capable of fulfilling any project assignment, large or small. LSA has operated as a full-service environmental planning and impact assessment firm with strong inhouse technical support services covering the majority of the areas necessary to prepare and/or review environmental documents, prepare and obtain regulatory permits, and provide environmental compliance monitoring during construction.

Relevant Project
Experience
▪ Caltrans District 7, On-Call Environmental Services
▪ Caltrans District 12 On-Call Environmental Services
▪ City of Cypress On-Call Environmental Services, Cypress, CA ▪ City of Irvine 2022-2025 Consultant Team, Irvine, CA

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 9
MOORE IACOFANO GOLTSMAN, INCORPORATED (MIG, INC.), CORPORATION Firm Information
Address: 109 W. Union Avenue, Fullerton, CA 92832
Phone Number: 714-871-3638 ext. 4040
Key Personnel Contact Name: Steve Lang
Project Function: Landscape Architecture/Outreach
Firm Profile
MIG, Inc., is a multidisciplinary firm that focuses on developing plans that can be implemented. Our unique combination of design, management and communications expertise allows us to conduct planning in a highly interactive process involving all constituent groups. Through MIG’s participatory planning process, client goals and community interests work together to frame key issues and generate workable solutions.

Relevant Project
Experience
▪ Long Beach Pine Avenue Streetscape Improvements
▪ Long Beach Transit Gallery
▪ Big Bear Valley Pedestrian, Bicycle and Equestrian Master Plan ▪ Moonridge Road Streetscape Improvements, Big Bear Lake ▪ Firestone Boulevard Streetscape Improvements
▪ City Gateway Signage and Downtown Downey Monuments

MONUMENT ROW
Firm Information
Address: 200 Spectrum Center Suite 300, Irvine, CA 92618 Phone Number: 562-260-0507
Key Personnel Contact Name: Amber Costello
Project Function: Right of Way Phase & Determination
Firm Profile
Monument, a DBE, SBE, and WBE certified firm, is a full-service real estate and right of way company providing exceptional service, strategic planning, innovation, and timely delivery. They serve local, state, and federal agencies, transportation authorities, and engineering partners with public infrastructure projects throughout California. At Monument, they understand the difference an experienced, solutions-minded right of way partner can bring in achieving the goals and objectives of a project and that’s exactly what they are. Monument have successfully delivered hundreds of projects as a Team with our success attributed to their Company motto “we listen, we innovate, we deliver.” Relevant Project
Experience
▪ Foothill Gold Line, Foothill Gold Line Construction Authority ▪ Lincoln Boulevard Bridge Improvement, City of LA
▪ 2nd Street Bridge, City of Long Beach
▪ Sepulveda Pass Transit (Tunnel), Los Angeles County
Metropolitan Transportation Authority
▪ I-405 Auxiliary Lane Improvements, LA Metro

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 10

NINYO & MOORE GEOTECHNICAL & ENVIRONMENTAL SCIENCES CONSULTANTS Firm Information
Address: 355 S Grand Avenue, Suite 2450, Los Angeles, CA 90071 Phone Number: 213-488-5111
Key Personnel Contact Name: Michael Putt, PG, CEG
Project Function: Geotechnical Engineering
Firm Profile
Ninyo & & Moore, a California Corporation, is a minority-owned,, multidisciplinary consulting firm that provides high-quality geotechnical and environmental consulting services. The firm was incorporated in 1987 to provide consulting services in geotechnical engineering, construction inspection and testing, engineering geology, hydrogeology, hazardous waste remediation and
environmental assessment. We are committed to being responsive, thorough, technically sound, and active in the business community.

Ninyo & Moore serves its clients through 15 offices in California, Arizona, Colorado, Nevada, Texas, and Utah. Ninyo & Moore has had the privilege of providing geotechnical and environmental consulting, soils and materials testing services to the County of Los Angeles on various contracts either as a prime consultant or as a subconsultant for numerous capital improvement projects.

Relevant Project
Experience
▪ City of Los Angeles On-Call Geotechnical/Environmental Services ▪ City of Diamond Bar On-Call Geotechnical Services
▪ City of Anaheim On-Call Consulting Support for Public Works

RMA GROUP
Firm Information
Address: 12130 Santa Margarita Court,
Rancho Cucamonga, CA 91730
Phone Number: 909-989-1751
Key Personnel Contact Name: Slawek Dymerski, PE, GE
Project Function: Materials Testing & Special Inspection Firm Profile
RMA Group (RMA), established in 1962, is a California corporation with professional offices and laboratory facilities strategically located throughout California. RMA Group’s geotechnical and geologic design services include preliminary geotechnical investigations, foundation studies, fault investigations, liquefaction analysis, Phase 1 environmental site assessments, and geotechnical and geologic review of grading and foundation plans. Their inspectors and technicians are highly qualified to perform all aspects of construction inspection and materials testing.

They are experienced, cross-trained, and hold multiple certifications including ICC, ACI, AWS, ASNT, OSHPD, DSA, NICET, and more than 500 individual Caltrans certifications, which allows them to inspect diverse elements of construction projects simultaneously.

Relevant Project
Experience
▪ Minor Streets Rehabilitation
▪ Park to Playa Pedestrian Overcross
▪ Flower Street

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 11
STANTEC CONSULTING SERVICES INC.

Firm Information
Address: 38 Technology Drive, Suite 200, Irvine, CA 92618-5312 Phone Number: 949-926-6000
Key Personnel Contact Name: Keith Rutherfurd
Project Function: Traffic Engineering/Planning
Firm Profile
Stantec, provides professional consulting services in planning, engineering, architecture, interior design, landscape architecture, surveying, environmental sciences, project management, and project economics for infrastructure and facilities projects.

Continually striving to balance economic, environmental, and social responsibilities, Stantec is recognized as a world-class leader and innovator in the delivery of sustainable solutions. We support public and private sector clients in a diverse range of markets, at every stage, from initial concept and financial feasibility to project completion.

Our local Irvine office staffs traffic engineers and planners familiar with the latest state-of-the-art computer-based traffic analysis, modeling, and design tools.

Relevant Project
Experience
▪ Mines Avenue Regional Bikeway, Pico Rivera
▪ Jamboree Road/Main Street Intersection Enhancement, Irvine ▪ Harvard Ave./Michelson Dr. Intersection Improvements, Irvine ▪ Jeffrey Open Space Trail (JOST) Extension, Irvine

VICUS LLC
Firm Information
Address: 1808 Manning Avenue #303, Los Angeles, CA 90025 Phone Number: 562-477-0987
Key Personnel Contact Name: Monica Villalobos
Project Function: Urban Planning
Firm Profile
VICUS specializes in Planning, Design, and Environmental consulting services. We are a female-led and minority-owned and operated company, founded in 2017, SBE/ DBE certified. We offer our clients integrated services at every stage of the project delivery process from early planning and analysis to environmental clearance, design, and construction. VICUS is headquartered in Los Angeles. The VICUS team provides planning expertise, urban design, environmental consulting, and outreach support services on infrastructure projects throughout California. This combination of experience informs the delivery of projects that are inclusive, well designed, and centered around transportation
Relevant Project
Experience
▪ Eastside Transit Corridor Phase 2
▪ C Line (Green Line) Extension to Torrance
▪ K Line Northern Extension
▪ Rail-to-Rail Construction Management Support Services

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 12

SUBCONSULTANT PROJECT EXPERIENCE CLIENT REFERENCE
LSA | Caltrans District 7 On-Call Environmental Services LSA has provided on-call environmental services for District 7 since 2005. LSA was awarded two on-call environmental contracts with Caltrans District 7: (1) I-5 Corridor from Kern County to Orange County Borderline (Contract No. 07A3453); and (2) Los Angeles County, Central Area (Contract No. 07A3451).

LSA provided professional and environmental generalist services on an “asneeded” basis for the preparation of environmental documents and related environmental technical studies to support the development and construction of proposed State transportation facilities. LSA completed all 15 task order requests issued by Caltrans for Contract No. 07A3451.

Caltrans District 7
Jason Roach
Ph. 213-310-2653
[email protected]
EMI | Venta Spur Bicycle-Pedestrian Bridge
The proposed two-span bridge over SR-133 will be approximately 264 feet long and 17 feet wide, and will be supported on 16-inch and 24-inch CIDH piles. The proposed single-span bridge over Marshburn Channel will be approximately 23 feet long and 17 feet wide, and will be supported on 16-inch CIDH piles.

In addition, four retaining walls and an overhead sign are proposed. EMI prepared two Preliminary Foundation Reports for Type Selection, managed geotechnical field investigation, provided recommendations for foundations, and prepared three Foundation Reports. Performed ADL study and prepared ADL report. EMI worked with Caltrans and TCA reviewers to minimize the review time gaining approval of the Foundation Reports.

City of Irvine
Vu Tran, PE
Ph. 949-724-6358
[email protected]
MIG | Anaheim Coves Multi-Use Trail
Anaheim Coves, formerly Burris Basin, was a commercial source for sand and gravel before the Orange County Water District (OCWD) bought and transformed the quarry pit into a groundwater recharge basin. MIG developed a master plan and construction documents to create a universally accessible trail with viewing decks, interpretive signage, and California native plantings.

From a safe distance, visitors are able to enjoy the wildlife and 14 acres of open space around the basin. Due to the ongoing issue of improper maintenance for native planting, training of landscape maintenance staff was included in the specifications. This training portion of the specifications was developed as a living document that can be updated as the project matures.

City of Anaheim
Pamela Galera
Former Principal Project Planner
Ph. (951) 826-2075
[email protected]
NINYO & MOORE | Geotechnical & Environmental Consulting Services Since 2006, Ninyo & Moore has been providing on-call services to the City of Los Angeles, Department of Public Works, Bureau of Engineering, Geotechnical Division to provide geotechnical and environmental engineering services.

Scope of services includes preparing geotechnical data and investigation reports, as well as construction support services, including geotechnical observation and testing during construction utilizing our City of Los Angelescertified Deputy Grading Inspectors. Environmental scope of services includes hazardous materials evaluations for soils, groundwater, and building materials, including asbestos and lead paint. These projects have included sewer and storm drains, landslide and slope evaluations, parks and recreational facilities, fire and police stations, and other capital improvement projects.

City of Los Angeles
Patrick Schmidt
Ph. (213) 847-0535
[email protected]

CONSULTANTS AND/OR SUB-CONSULTANTS
City of Pico Rivera
Proposal for On-Call Engineering Services 13

SUBCONSULTANT PROJECT EXPERIENCE CLIENT REFERENCE
STANTEC | Jamboree Rd./Main St. Intersection Enhancements Traffic Analysis Stantec prepared the traffic analysis supporting the Project Report / Environmental Document (PR/ED) during the preliminary engineering phase of enhancement to this critical intersection of two major arterial roadways located in the Irvine Business Complex (IBC). Seven (7) alternative enchancement scenarios were identifed and analyzed using both the Intersection Capacity Utilization (ICU) Method and the Highway Capacity Manual (HCM) operations method to determine level of service (LOS) and vehicle delay under existing, near-term, and buildout traffic conditions for weekday and Saturday peak hour conditions. Queuing analysis was also performed to confirm the required storage lenths for turn lanes using SimTraffic version 10. SimTraffic was also used to develop visulations of intersection operations for use at public meetings.

City of Irvine
Melissa Dugan
Ph. 949-724-7384
[email protected]
MONUMENT | Interstate 405 Improvement Project
The right of way program included 286 partial acquisitions and 2 full take acquisitions. The partial acquisitions consisted of fee, roadway easements, slope easements, footing easements, public utility easements, and temporary construction easements. Both full acquisitions required the displacement of a total of 6 commercial tenants. The original parcel count was 386 acquisitions, however, through diligent collaboration between the right of way team and the design team during the preliminary design phase, nearly 100 parcels were eliminated from the project by adjusting the design requirements and minimizing the right of way footprint.

Orange County
Transportation Authority
Joe Gallardo
Ph. 714-560-5546
[email protected]
VICUS | C Line (Green Line) Extension
VICUS serves as the Community Integration lead for the Metro Green Line Extension to Torrance including overseeing TOC, FLM, Urban Design and community coordination. The project involves analysis of light rail alternatives connecting the existing Metro Green Line station terminus in Redondo Beach to possible connections in the City of Torrance. Evaluation of station areas and community fit will be conducted through TOC and FLM analysis, walk audits with local stakeholders and coordination with partner agencies.

Los Angeles County
Metropolitan Transportation
Authority
Georgia Sheridan
Ph. (213) 922-6000
[email protected]
RMA GROUP | Flower Street Sewer Main Improvements
RMA Group provided construction inspection and testing services for the Flower Street Sewer Main Improvements project. Our scope of services included trench earthwork, crushed aggregate base, asphalt concrete paving and concrete paving operations.

City of Santa Ana
Arnie Cvek
Ph. (714) 647-5051
[email protected]

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 14

TYPICAL PROJECT APPROACH
BKF Engineers recognize that an organized On-Call project delivery approach is critical for project success. We understand that managing, building consensus, and obtaining project approvals and permits are often more challenging than preparing the actual design documents. Ensuring that these processes are managed will allow projects to be delivered on schedule and within budget.

BKF’s management philosophy integrates the following key components: managing the process; defining the critical issues; developing coordinated design documents; and validating implementation.

COMPONENT 1: MANAGING THE PROCESS
PROJECT WORK PROGRAM: When the City identifies a scope specific project, our Principal-in-Charge, Chris Rideout, PE and Project Manager, Sheila Amparo will be available to meet and review the Project goals. Based on the specific tasks provided, will assign a team who will be committed to the Project for the duration. We will develop a detailed project work program that identifies tasks and deliverables tailored to deliver the Project. We intend for this work program to be a living document that we update regularly to reflect the progress and needs of the Project.

DEFINED SCHEDULE: We will develop our work program with reference to a schedule in Microsoft Project format. Our dedicated Project Managers will update the schedule with the completion of each phase, discuss and gain concurrence with the City. The schedule is a critical tool for the Project Team, City, and other Stakeholders to ensure all agree to the tasks and delivery dates. It is imperative to regularly review the baseline schedule and identify any potential tasks that are slipping behind schedule. If this situation occurs, our PMs will work with the team to establish a recovery plan to bring the design schedule back into alignment with the baseline schedule. This recovery schedule will be discussed with the City to ensure concurrence moving forward.

DESIGN FEE: The BKF team will develop a fee for our services based on the agreed to scope of services and schedule.

COMPONENT 2: DEFINING CRITICAL ISSUES
CRITICAL CONSIDERATIONS: For street/roadway projects, the Project Team will prepare geometric alignment studies to ensure the objective and standards for the improvements are adequately addressed. This early establishment and agreement with the City on the geometrics will allow the Project Team to identify critical issues, such as right of way acquisitions and utility relocations that require lengthy lead times that may affect the Project schedule and budget.

DEFINING CONSTRUCTION RISK: Risk assessment is key to managing the overall construction budget. Our experience is that characterizing subsurface soils and utilities is critical to managing unknowns that could lead to contractor change order and/or delays. BKF will work with City Staff to identify on any environmental considerations/mitigations early on in the project to ensure the project stays on schedule and can meet the environmental needs of the project as the design is developed. Comprehensive Construction Staging and Traffic Handling plans depicting vehicle/pedestrian circulation as well as efficient Contractor work areas are critical in clearly showing the intent/limit of any closures.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 15
STAKEHOLDERS: Understanding the concerns of the Project’s stakeholders at the earliest stage in the design process is essential to prevent delays or conflicts. BKF will coordinate and attend all meetings to understand goals and objectives of all stakeholders and confirm they are aligned properly with the City. Engaging all stakeholders from the beginning of the design process through construction will minimize misunderstandings and will result in a project that meets all objectives.

COMPONENT 3: DEVELOPING COORDINATED DESIGN DOCUMENTS
COORDINATION: The communication conduit with the City will be with Sheila Amparo, PE, QSD, Project Manager. This single point of contact eliminates possible misunderstandings and duplication of effort.. This team will be responsible for solving technical challenges while developing the design in accordance with the City’s goals.

We will coordinate the work with other consultants, Staff, and other agencies to ensure collaboration and obtain Project approvals.

COORDINATING AGENCIES: BKF’s experience with public infrastructure projects has taught the value of having clear direct communication and of being accessible at all times during critical project stages. We believe our working relationships with local, state and federal agencies will allow us to streamline the process by minimizing costly lags in communication.

TECHNOLOGY: BKF implements the latest technology to develop designs including AutoCAD Civil 3D. We also have specialized simulation software to assist in the design of infrastructure including AutoTurn, StormCAD, WaterCAD, SewerCAD, HEC HMS, and HEC RAS.

For preparation of illustrative exhibits, we have Adobe Illustrator, Photoshop, and InDesign.

All staff has access to the most current Microsoft Office applications suite.

COMPONENT 4: VALIDATING IMPLEMENTATION
INTERNAL QA/QC: BKF will complete an internal review of all project documents.

Under direct communication with the assigned Project Manager, Jason Kirchmann, PE, PLS will check the documents for errors, perform a constructability review, ensure our documents are coordinated with other disciplines, and suggest alternatives for cost savings. During this period all consultants on the team are required to review not only their own work, but evaluate the other disciplines designs to ensure there are no conflicts and design intent is consistent among the team members.

PROBABLE CONSTRUCTION COST: Evaluating the potential construction cost throughout the Project’s life is essential to create a feasible project. BKF is consistently involved in the design and construction of numerous projects each month that provide excellent insight into construction trends and costs. With each submittal, BKF will prepare an opinion of cost to assist in developing a project budget.

With BKF’s four-component approach, a detailed work plan, and continually monitoring, we believe that partnering is both aligned and reinforced. This ensures that the City together with BKF’s leadership and the team’s technical expertise, will meet its goals and objectives for a successful On-Call experience.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 16
The BKF team is well organized to tackle the City of Pico Rivera’s needs in a timely manner.

We will assist the City in developing creative solutions to challenges as we have done so on previous projects. The continuity and long tenure of our staff is evidence that the personnel who we have committed to this On-Call will see the various projects through from start to finish. Each team member is cross trained and has a clear understanding of their role for each assignment. This will allow each team member to properly allocate their resources and make the necessary commitments to the project team. The following is a sample of our scope of services and will be revised according to the needs of each project issued by the City.

PROJECT MANAGEMENT
PROJECT MANAGEMENT: As Project Manager, Sheila Amparo, PE, QSD/P, will be responsible for the day-to-day management of the project design team, including the technical management of the project.

PROJECT KICKOFF MEETING/PUBLIC OUTREACH/PDT MEETINGS: BKF will develop the agenda, invite project team members and stakeholders and administer a project kick-off meeting. This meeting will confirm project scope, deliverables, schedule, communication conduits, invoicing, and establish future Project Development Team (PDT) meetings. BKF will prepare meeting minutes and distribute to all in attendance for review and concurrence. Our team will attend Project Development Meetings, Public Outreach, and City Council Meetings to support City Staff and the convey the Project goals.

MASTER PROJECT SCHEDULE/PROGRESS
REPORTS: Upon receipt of a task order from the
City, we will provide a Project Master Schedule
in Microsoft Project to the City. The schedule will
be updated and distributed during PDT meetings
to confirm the Project is tracking according to
expectations. BKF will prepare progress reports
indicating current tasks, outstanding items,
schedule monitoring, and future anticipated
meetings. The progress reports will be prepared
and submitted monthly to the City Project
Manager prior to the 15th of every month for the
duration of the project.

MONTHLY INVOICING: BKF will collect, review and compile invoices from the design team on a monthly basis and will provide the City with the teams composite invoice. Invoices will delineate the current percent complete by task which along with the project schedule can be used to confirm effort, payment, and deliverables are in agreement.

PROJECT MANAGEMENT - DELIVERABLES
• Master Schedule and Updates
• Meeting Agendas and Minutes
• Invoices
• Monthly Status/Progress Reports
• Public Outreach Concept Plans and Drawings
• Public Outreach Materials

TYPICAL SCOPE OF SERVICES
ID Task Name Duration Start Finish
1 CONTRACT AWARD/EXECUTION 1 day Wed 10/24/18 Wed 10/24/18 2 3 KICK-OFF MEETING 1 day Wed 10/31/18 Wed 10/31/18
4 KICK-OFF MEETING 0 days Wed 11/7/18 Wed 11/7/18
5 1 day? Wed 10/31/18 Wed 10/31/18
6 PICO RIVERA REGIONAL BIKEWAY (CIP NO. 21280) 451 days Wed 10/24/18 Wed 7/15/20 7 Task 1 - Project Management, Meetings and Outreach 150 days Wed 10/31/18 Tue 5/28/19 8 Task 1.1 - Project Administration 880 days Wed 10/31/18 Tue 3/15/22 9 Attend Kick-Off Meeting 1 day Wed 10/31/18 Wed 10/31/18 10 Attend Coordination Meetings 44 mons Wed 10/31/18 Tue 3/15/22 11 Community Outreach and Council Meetings 44 mons Wed 10/31/18 Tue 3/15/22 12 Task 2 - Project Report and Environmental Clearance 227 days Wed 10/31/18 Thu 9/12/19 13 Task 2.1 - Base/Preliminary Data Review 880 days Wed 10/31/18 Tue 3/15/22 14 Utility Record Request/Notification (Utility A, B and C Letters) 9 mons Thu 11/1/18 Wed 7/10/19 15 Utility Base Mapping 3 wks Thu 11/22/18 Wed 12/12/18 16 Utility Coordination Meetings (3 Meetings) 44 mons Wed 10/31/18 Tue 3/15/22 17 Task 3 - Preliminary Engineering 216 days Wed 10/31/18 Wed 8/28/19 18 Task 3.1 - Design Survey 15 days Thu 11/1/18 Wed 11/21/18 22 Task 3.2 - Records Research and Field Reviews 150 days Wed 10/31/18 Tue 5/28/19 26 Task 3.3 - NPDES Program Compliance 40 days Fri 4/17/20 Thu 6/11/20 27 NPDES Compliance Memo 4 wks Fri 4/17/20 Thu 5/14/20
28 NPDES Technical Documents and Design 8 wks Fri 4/17/20 Thu 6/11/20 29 Task 3.4 - Pavement Investigation 51 days Mon 1/28/19 Mon 4/8/19 30 Pavement Evaluation 10 wks Mon 1/28/19 Fri 4/5/19
31 Submit Draft Pavement Engineering Report 1 day Mon 4/8/19 Mon 4/8/19 32 Task 3.5 - Geotechnical Engineering 397 days Thu 11/8/18 Fri 5/15/20 33 Geotechnical Investigation Report 397 days Thu 11/8/18 Fri 5/15/20 34 408 Permit Application (For Geotechnical Borings at San Gabriel River) 84 days Thu 11/8/18 Tue 3/5/19 46 Conduct Geotechnical Borings 1 wk Mon 2/17/20 Fri 2/21/20 47 Prepare Geotechnical Investigation Report 12 wks Mon 2/24/20 Fri 5/15/20 48 Task 3.6 - Hydraulic Analysis 135 days Mon 3/9/20 Fri 9/11/20 49 Hydrology/Hydraulics Study Report 12 wks Mon 3/9/20 Fri 5/29/20 50 Draft and Final SUSMP 15 wks Mon 6/1/20 Fri 9/11/20
51 Task 3.7 - Concept Plans 58 days Wed 10/31/18 Fri 1/18/19 52 Task 3.7.1 - Concept Plans (Road, Bridge and Landscape) 2 wks Thu 11/15/18 Wed 11/28/18 55 Task 3.7.2 - Public Outreach and Meetings 1 day Mon 8/12/19 Mon 8/12/19 56 Task 3.7.3 - Final Concept Plans 1 wk Fri 8/2/19 Thu 8/8/19 59 Task 3.8 - Environmental Document 483 days Wed 10/31/18 Fri 9/4/20 60 PES Form and Intitial Study (ISA Check List) 70 days Wed 10/31/18 Tue 2/5/19 61 Prepare PES Form 15 days Wed 10/31/18 Tue 11/20/18
62 Caltrans Review #1 of PES Form 25 days Wed 11/21/18 Tue 12/25/18 63 Revise PES Form and Provide Additional Information to Caltrans 5 days Wed 12/26/18 Tue 1/1/19 64 Caltrans Review #2 25 days Wed 1/2/19 Tue 2/5/19
65 Technical Studies and NEPA Categorical Exclusion 82 days Wed 2/6/19 Thu 5/30/19 72 NEPA Revalidation 81 days Fri 5/15/20 Fri 9/4/20
73 Review NEPA Revalidation 1 wk Fri 5/15/20 Thu 5/21/20 74 Submit NEPA Revalidation to City 1 day Fri 5/22/20 Fri 5/22/20 75 City Review of NEPA Revalidation 1 wk Mon 5/25/20 Fri 5/29/20 76 Revise Revalidaton and Submit Final to City to Submit to Caltrans 5 days Mon 6/1/20 Fri 6/5/20 77 Caltrans Review 30 days Mon 6/8/20 Fri 7/17/20
78 Submit Revised NEPA Revalidation 5 days Mon 7/20/20 Fri 7/24/20 79 Caltrans Review 30 days Mon 7/27/20 Fri 9/4/20
80 CEQA Initial Study 126 days Wed 1/2/19 Wed 6/26/19
83 CEQA Initial Study (ADDENDUM) 249 days Tue 6/25/19 Fri 6/5/20 84 City Adopted CEQA Document 1 day Tue 6/25/19 Tue 6/25/19 10/3110/31
11/7
21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 1724 3 10 1724 31 7 1421 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 1522 29 6 1320 27 3 1017 24 1 8 15 22 29 5 12 19 26 2 9 16 23 1 8 15 22 29 5 1219 26 3 1017 2431 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 4 1118 25 1 8 15 2229 6 13 2027 3 10 17 24 31 7 14 21 28 7 14 21 28 4 11 18 25 2 9 16 2330 6 13 2027 4 11 1825 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 2128 5 12 1926 2 9 1623 30 6 1320 27 6 13 Oct '18 Nov '18 Dec '18 Jan '19 Feb '19 Mar '19 Apr '19 May '19 Jun '19 Jul '19 Aug '19 Sep '19 Oct '19 Nov '19 Dec '19 Jan '20 Feb '20 Mar '20 Apr '20 May '20 Jun '20 Jul '20 Aug '20 Sep '20 Oct '20 Nov '20 Dec '20 Jan '21 Feb '21 Mar '21 Apr '21 May '21 Jun '21 Jul '21 Aug '21 Sep '21 Oct '21 Nov '21 Dec '21 Jan '22 Feb '22 Mar '22 Task Milestone Summary Project Summary Project Deliverable City Review Manual Summary Rollup Manual Summary Progress CITY OF PICO RIVERA REGIONAL BIKEWAY PROJECT (CIP NO. 21280) Mon 6/15/20 BKF NO. 20181006
LEGEND

SAMPLE PROJECT SCHEDULE

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 17

AGENCY AND UTILITY COORDINATION
STAKEHOLDER COMMUNICATION: We will engage with the project stakeholders during the early phase of work. The BKF team will reach out and communicate with the project stakeholders, and update the contact person as necessary. As part of this effort, we will:
▪ Make necessary contacts with districts, parks and recreation or other involved agencies concerning facilities to determine design requirements for the construction of new facilities and structures.
▪ Coordinate with all affected agencies, including school districts, utilities, irrigation districts and government agencies, as necessary.
▪ Communicate with property owners as necessary.

UTILITY RESEARCH AND COORDINATION: Our standard practice when starting a new project is to engage the utility companies early in the project, and pro-actively work with them to protect their utilities, or to determine ideal relocation routes. We start by establishing the lines of communication with utility companies present within the project area, such as City of Pico Rivera Municipal Utilities Company, Southern California Gas Company, Southern California Edison and coordinate with the City of Pico Rivera Public Works Department as needed, by sending out Utility “A” Letters requesting for their record drawings and as-builts.

Once we have received all the as-builts and record drawings from each agency, we will incorporate the existing facilities into the utility base mapping in AutoCAD format. Upon completion of the utility base mapping, we will schedule a meeting simultaneously with all third-party utility companies in an “all-hands” meeting. At that meeting, we will present the project and identify utilities needing relocation. Most importantly, we will discuss the timeline for when the utility requires relocation to maintain the project schedule. At this “allhands” utility meeting, these utility companies are able to coordinate with each other and find opportunities to be in joint relocations reducing their construction costs and reduce their relocation schedules.

We will distribute the Utility “B” Letters with the composite utility plans, and request that they confirm their existing and future facilities. All the gathered utility information will update our comprehensive utility map and matrix that were used to supplement the project base sheets to provide a complete existing utility base. This level of effort will minimize construction costs and ensure the correct placement of the proposed improvements. As part of the utility coordination work, we will:
▪ Review and update as-built utility information
▪ Request utility mapping from all affected utility owners ▪ Update base mapping with existing utility information ▪ Based on our understanding of the utilities and the impact of our project on those utilities, we are not anticipating needing any potholing ▪ Submit utility maps to impacted utility owners for verification ▪ Identify potential utility conflicts
▪ Coordinate the above work with the utility owners

AGENCY & UTILITY COORDINATION - DELIVERABLES
• Utility Map and Matrix
• Utility Notification Letters

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 18
• Meeting Agendas and Minutes
• Utility Meetings
• Existing Conditions Base Mapping

PRELIMINARY ENGINEERING
DESIGN SURVEY: BKF will establish project controls, both vertically and horizontally, on the City datum and will set panels for the aerial survey. In areas where more detailed surveying will be required, BKF field crews will conduct a supplemental survey to gather information on critical points (i.e., CL, BCR, ECR, flow lines, edge of gutter) grades, utility structures, and other items necessary to complete the design. In addition, using available record information, BKF will review, research, and tie-in the existing right of way for the project limits.

Our survey crews utilize Leica and Trimble robotic total stations, Trimble R10 GPS receivers, and a Leica C10 & P40 high-definition laser scanner. Our computers include Dell desktops, laptops, and enterprise servers. We regularly invest in updates to our hardware and software including a full suite of Microsoft, Adobe, and Autodesk products. Scheduling is done with Microsoft Project. Our CAD software includes AutoCAD Civil 3D 2021 with AutoTurn, survey, and hydrology extensions. Electronic submittals can be provided in any format.

With the use of Leica P40 HDS Scanners, BKF has the ability to collect high resolution point cloud data at 1,000,000 points per second. The data gathered allows the ability to create 3-dimensional models of projects, including as-built surveys, topographical site surveys, roadway and highway surveys, ADA surveys, buildings, bridges, striping, and utility plants.

Typical Surveying Services include:

CONSTRUCTION STAKING
- Review plans
- Calculate offset points
- Prepare cut sheets
- Collect as-built stake location
- Perform field staking

RESEARCH
- Review title reports provided
- Review data provided by the City
- Research maps of record
- Research City/County road files/available
field notes
- Research Caltrans records
- Calculate record information to identify
title conflicts

GPS CONTROL
- Identify horizontal and vertical
control datum
- Reconnaissance of existing control
- Pre–planning of static survey
- Field observations
- Post process data
- Prepare GPS Control Report

BOUNDARY SURVEY
- Calculate search ties for existing corners
- Field surveys to tie out found points to
control net
- Adjustment of data
- Resolve discrepancies between record
data & found evidence
- Prepare hardcopy of title information,
found evidence and resolved boundary

RIGHT OF WAY MAPPING
- Review City right of way requirements
- Prepare appraisal maps and
individual plats
- Prepare property descriptions
and plats
- Monument right of way
- Prepare Record of Survey

TOPOGRAPHIC MAPPING
- Determine best method for topographic
(topo) mapping based on
client’s needs
- If aerial mapping, provide photo
control utilizing RTK or fast static GPS
- Perform on the ground topo mapping
ALTA
- Research maps and deeds of record
- Calculate record documents
- Locate field evidence of property corners
and movements
- Boundary information
- Plot title exceptions & easements
3D LASER SCANNING
- Topo, as-built and monitoring surveys
- High speed data capture for future
manipulation and extraction
- Geo-reference using onsite
project control
- 3-D models
- Utilizes Leica C10 & P40
High-Definition Scanners

CONVENTIONAL SURVEYS
- Provide accurate, fast and efficient results
for topographic surveys and
construction staking
- Adaptable to project needs
- Provides highly repeatable results

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 19
RECORDS RESEARCH AND FIELD REVIEWS: We will perform site visits with the City Staff, especially its Maintenance Crew and the Design Team, to identify key issues and concerns, that may not be as apparent. This is the opportunity to not only identify key issues and concerns, but identify and determine the scope and limits of work. To minimize construction cost, we will work closely with the City staff to identify critical items of work and satisfy the City’s vision in revitalizing its community. We will create an inventory of the field conditions, identifying areas that are non-ADA compliant to make recommendations to satisfy the standard requirements. As part of this task, a Field Condition Assessment Memo and a Photo Diary will be prepared and submitted.

NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (NPDES) PROGRAM COMPLIANCE: If required, our team can prepare an NPDES compliance memo which identifies the applicable NPDES Technical Documents and proposed Best Management Practices (BMPs). Possible Technical Documents may include, but are not limited to, a Water Quality Management Plan, Storm Water Pollution Prevention Plan (SWPPP), or Storm Water Pollution Control Program (WPCP) as required by the Regional Water Quality Control Board, Caltrans, or other state and federal agencies. A draft NPDES compliance memo will be submitted to the City for review and comments. Upon receiving of the review comments, the comments will be incorporated into the final NPDES compliance memo. Following NPDES compliance concurrence, the prescribed NPDES Technical Documents will be prepared.

PAVEMENT INVESTIGATION: On pavement rehabilitation projects, our Team will initially perform visual inspections. Based on the visual inspection of the existing pavement, we will identify the potential cause of any pavement failure such that an effective reconstruction/ rehabilitation strategy can be developed. We will explore the site’s subgrade soil condition and provide recommendations for the structural pavement section, as well as grading requirements for construction of the pavement, curb, gutter, and sidewalk.

Should on-site infiltration using BMP facilities is planned, we will evaluate the percolation characteristics of the site soils using appropriate site-specific percolation tests. The feasibility evaluation of the proposed BMP facilities should appropriately address the depth to groundwater and settlement/hydro collapse concerns of underlying soils. We will prepare and submit the Draft and Final Geotechnical Investigation Report, as well as the electronic version to the City.

GEOTECHNICAL INVESTIGATION: BKF Engineers subconsultants, EMI or Ninyon & Moore, will provide, based on literature review, field explorations, laboratory testing, engineering analyses, and constructability reviews. The field exploration type, equipment, location, depth, and sampling pattern will be carefully selected so that required data is collected in an efficient manner. We will develop design solutions that are innovative yet practical and readily constructible, considering site constraints, design requirements, existing subsurface conditions, and long-term performance.

HYDROLOGY/HYDRAULICS/DRAINAGE IMPROVEMENTS: Based on the needs of a project, our Team will initiate the drainage design consistent with the concept design by performing a hydrology study of the drainage areas tributary to the project area. The hydrology study will typically consist of a Rational Method analysis performed with software developed by Advanced Engineering Software (AES). The software was designed to accept watershed data and perform Rational Method analyses in accordance with the Orange County Department of Public Works Hydrology Manual. The hydrology study will determine 10- and 25-year peak discharges at locations critical to flood water management.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 20
Projects will be evaluated with respect to current water quality requirements as defined by the County’s National Pollutant Discharge Elimination System (NPDES) Permit as issued by the Los Angeles Regional Water Quality Control Board. Once the requirements are established, preliminary plans for the implementation of storm water quality Best Management Practices (BMPs) will be developed in parallel with the design of the flood control elements of the Project.

This parallel approach will result in an integrated water quality and flood control plan.

DRAFT CONCEPT PLANS: BKF will prepare the Draft Concept Plans that includes the critical elements of the project. These conceptual plans will depict the various design alternatives and aesthetic options the City will select from to progress to the Final Design.

With the budget permitting, a 3D visualization in support of public presentations and council meetings may be developed. Photosimulations (a technique in which proposed conditions are superimposed on photographs) shall be used to convey the various alternatives to City Council and project stakeholders.

We will capture ground and aerial photography, which the City will be able to provide input on the preferred ground and aerial perspective for use in the photosimulations. The exhibits shall include:
▪ Existing and proposed view from an aerial perspective ▪ Existing and proposed view from a ground perspective
INITIAL STUDY: BKF Subconsultant, LSA, will prepare an Initial Study briefly summarizing the proposed project, the existing project setting, and potential project impacts related to each of the environmental resource topics contained in the Environmental Information Form, which is provided as Appendix G of the CEQA Guidelines.

The purpose of this Initial Study will be to provide the City with express findings related to each of these thresholds, thereby providing the City with the information needed to decide whether a Categorical Exemption is applicable to the proposed project. Otherwise if the Initial Study determines the Project may have significant impacts requiring mitigation then the Initial Study will serve as the basis for an IS/MND.

FINAL ENGINEERING
We will advance the preliminary concept plans to the final design level that have been reviewed and selected by the City.

PREPARATION OF PLANS, SPECIFICATIONS, AND ESTIMATES
Building on the Preliminary Engineering efforts, the Team will develop, as necessary, the following Construction Documents.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 21

TITLE SHEET
Prepared to provide an overview of the project limits
and an index of project sheets.

TYPICAL CROSS SECTIONS
Prepared to depict significant changes to the
roadbed geometry and roadway features.

GENERAL AND CONSTRUCTION NOTES
Included in the construction plan documents for City
requirements, such as general traffic control, BMPs,
are clearly conveyed and satisfied by the contractor.

PLAN AND PROFILES (ROADWAY PLANS)
These plans will show roadway improvements
including geometry, profiles, curb ramp
locations, sidewalk improvements and pavement
reconstruction areas.

CONSTRUCTION DETAIL SHEETS
Identify various elements of work which require
additional detail or enlarged scales such as custom
curb ramps and sidewalk transitions.

SIGNING AND STRIPING PLANS
Show the new signage and striping needs to
incorporate the new improvements based on
Manual Uniform Traffic Control Devices (MUTCD)
standard requirements, and include striping for offsite parking stalls.

COMPOSITE UTILITY PLANS
Show the existing utilities as well as any relocations
necessary due to the improvements associated
with the project.

STREET LIGHTING PLANS
Developed and will be alternating to ensure footcandle requirements are satisfied. Plans will include conductor/pullbox sizes and locations and service
point location.

PLANTING AND IRRIGATION PLANS
Developed by landscape architect and will show
the location and type of landscaping and irrigation
system proposed for the project. These plans will
reflect the planting palette approved by the City.

DRAINAGE SHEETS
Prepare and incorporate the findings of the
Drainage Analysis and stormwater treatment in the
plan and profile on the drainage sheets.

TRAFFIC SIGNAL MODIFICATION PLANS
Prepared for intersections and may, if the City
necessitates, include mounting bicycle pedestrian
signal heads on the traffic poles, rewiring of the
intersection and the installation of new conduit for
the bicycle pedestrian signalization, in conformance
with Caltrans standards and MUTCD guidelines.

CONSTRUCTION STAGING/

TRAFFIC CONTROL PLANS
Prepared by traffic engineer, showing the logical
sequence of the order of work. Traffic control plans
will be developed for each stage of construction.

Traffic control plans in conformance with MUTCD
guidelines will show construction area signs, lane
closures, and work zone areas of sufficient size to
allow the Contractor to work efficiently.

COST ESTIMATES
The BKF team will develop a line item cost estimate matching the measurement and payment clauses in the specifications that will be used as the baseline estimate for the project throughout the design and into construction. Detailed construction cost estimates and quantity calculations will be submitted as part of each milestone PS&E submittal packages.

SPECIFICATIONS
We will prepare the specifications for all work items necessary for the construction of the Project. BKF will assemble data and assemble the appropriate Special Provisions consistent with County, State, Federal, and funding regulations.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 22

PROJECT CONTROLS
BKF’s project controls process helps assist our team in producing and delivering quality documents that meet the project delivery, cost and quality objectives. BKF will keep the City of Pico Rivera informed and will work to exceed expectations and maintain the project on schedule.

PROJECT MANAGEMENT
▪ PROJECT KICKOFF MEETING/PUBLIC OUTREACH/PDT MEETINGS: BKF will develop the agenda, invite project team members and stakeholders and administer a project kickoff meeting. This meeting will confirm project scope, deliverables, schedule, communication conduits, invoicing, and establish future Project Development Team (PDT) meetings. BKF will prepare meeting minutes and distribute to all in attendance for review and concurrence.

Our team will attend Project Development Meetings, Public Outreach, and City Council Meetings to support City Staff and the convey the Project goals. ▪ MASTER PROJECT SCHEDULE/PROGRESS REPORTS: Upon receipt of Notice to Proceed (NTP) from the City, we will develop and deliver a Project Master Schedule in Microsoft Project to the City within 10 days. The schedule will be updated and distributed during PDT meetings to confirm the Project is tracking according to expectations. BKF will prepare progress reports indicating current tasks, outstanding action items, schedule monitoring, and future anticipated meetings. The progress reports will be prepared and submitted monthly to the City Project Manager prior to the 15th of every month for the duration of the project.
▪ MONTHLY INVOICING: BKF will collect, review and compile invoices from the design team on a monthly basis and will provide the City with the teams composite invoice. Invoices will delineate the current percent complete by task which along with the project schedule can be used to confirm effort, payment, and deliverables are in alignment.

DELIVERY CONTROL
▪ DEFINED SCHEDULE: A Microsoft Project schedule will be based on the work plan jointly developed by the City and BKF. At each phase, BKF will update the schedule which will incorporate time for the City to review the documents. Any deviations in the schedule will be discussed promptly with the City.
▪ OUTSTANDING ISSUES MATRIX: BKF will track all outstanding design and program issues in a matrix to facilitate discussions with the City and internal team. This matrix tracks design issues, costs and the schedule.
▪ SCHEDULE RECOVERY: If a delay in the schedule is encountered, either by the stakeholders or by the design team, BKF will develop a comprehensive revised schedule to bring the project back in compliance with the project delivery date. BKF will develop this plan, gain commitment from sub-consultants and present and gain agreement from the City. The plan will include staffing augmentations, possible concurrent activities, and a monitoring mechanism to ensure the schedule recovery remains on track. BKF has more than 450+ employees that are experienced in all aspects of municipal projects, which allows us to bring the staffing horsepower to the project to avoid slippage in schedules and maintain the City’s delivery date.

WORK APPROACH
City of Pico Rivera
Proposal for On-Call Engineering Services 23

COST CONTROL
▪ PROGRESS REPORTS: Our Project Manager will provide progress reports to the City to demonstrate the team is tracking with the project schedule. These reports will be comprehensive in nature to keep all design team members, City, and project Stakeholders appraised of the status of various tasks, any schedule
▪ CONSTRUCTION COST: BKF integrates cost estimates for each milestone delivery and compares to the baseline costs established early on in the project. During the initial tasks the BKF Team will refine the intent of the Concept Plan and develop a conceptual construction estimate in alignment with current construction costs due to inflation. BKF understands there are finite budgets associated with these capital improvement projects and will track and tailor the design accordingly.

QUALITY ASSURANCE /QUALITY CONTROL
QUALITY ASSURANCE PROGRAM: BKF will utilize Jason Kirchmann, PE, PLS as our dedicated Quality Assurance/Quality Control Manager. Jason’s key role is to ensure the Quality Control procedures delineated below are closely followed and the procedure documented.

LEVEL 1: INTERNAL REVIEW - EACH DISCIPLINE IS REQUIRED TO CONDUCT AN INTERNAL REVIEW PERFORMED PRIOR TO EACH MILESTONE SUBMITTAL.

A senior staff member at the firm, other than on the design team, shall review the documents prepared by the design team. This review will require that all items on the documents be highlighted in yellow indicating the review has occurred and there are no exceptions to the document. This process is for the entire document (i.e. north arrows, station call-outs, profile grid designation, etc.).
▪ If the reviewer identifies an item on the document that is not correct, then it is marked in red. If the reviewer has comments for clarifications, then it is marked in green. ▪ After the review is complete, the document is returned to the design team with a signature (documentation) indicating the review is complete.
▪ The design team will review and address all items in red and meet with the reviewer on the items in green until a clarification allows for the reviewer to yellow the item, or a red mark is added.
▪ The design team will then resolve the red marks and return the reviewers original markup along with a clean print. The reviewer will document the comments that have been addressed by yellowing out the original red mark and placing yellow on the clean set, and signing the document.

LEVEL 2: INTER-DISCIPLINARY REVIEW - THIS REVIEW IS TO CONFIRM THAT THERE ARE NO INTER- DISCIPLINARY CONFLICTS AND OCCURS AT THE 95% AND FINAL SUBMITTAL MILESTONES.
▪ All disciplines provide their plans to BKF for collation. BKF will assemble the sets and distribute to the design team.
▪ Each discipline will review the others and similar to the process delineated in Level 1 above, marking in yellow, red, or green, and return to BKF for collation. ▪ A meeting will be held with all the disciplines in attendance, and the documents with all red or green comments will be discussed and resolved between disciplines. ▪ The resolutions will be marked in red and returned to the designer for incorporation as described above in the Level 1 procedure.

CLIENT REFERENCES
City of Pico Rivera
Proposal for On-Call Engineering Services 24
The Project includes the roadway, sidewalk, and ADA curb ramp improvements of the local streets at the westside of the City of South Gate. To the maximum extent practical, the design shall consider sustainability in pavement technologies, air quality, storm water treatment, water conservation, green streets technologies, complete streets, etc. BKF Engineers was selected to provide professional services, including preliminary engineering, surveying, civil design, preparation of plans, specifications and estimates (PS&E), assist during Construction Bidding Phase, provide Construction Support and assist in Project Closeout for the Citywide Residential Resurfacing Project.

REFERENCE
City of South Gate
Kenneth Tang, PE,
8650 California Avenue
South Gate CA 90280
Ph. (323) 563-9574
[email protected]

SOUTH GATE RESIDENTIAL RESURFACING PHASES I,II, & III
South Gate, CA
BKF Engineers is leading the civil design for the Pico Rivera Bikeway Project, a 1.5-mile bicycle facility that will add a connection over the San Gabriel River. The project includes a Class I bike path along Mines Ave. from the Rio Hondo Channel to the San Gabriel River, a new bridge structure located north of Mines Ave. spanning the San Gabriel River and Class I and II bike lanes along Dunlap Crossing Rd. from the San Gabriel River to Norwalk Blvd. Additionally, there is a complete streets improvement along Mines Avenue from the Rio Hondo Channel to the San Gabriel River. The improvements on Mines Ave. include but are not limited to: pavement reconstruction; installation of bioswales; reconfiguration of parking lanes; upgrading street lights; traffic signal modifications at Rosemead Blvd and Mines Ave; and landscaping.

REFERENCE
City of Pico Rivera
Kenner Guerrero
6615 Passons Boulevard
Pico Rivera CA 90660
Ph. (562) 801-4351
[email protected]

PICO RIVERA REGIONAL BIKEWAY
Pico Rivera, CA
As part of the City of Buena Park’s pavement rehabilitation program, the City has identified the segment of Rosecrans Avenue between the eastern and western City Limits in the vicinity of Ralph B. Clark Regional Park as part of the 2020 construction cycle. Rosecrans has a longitudinal slope sufficient to not allow for ponding which in turn would lead to isolated flatwork/pavement failures. The landscape area are at the back of the sidewalk with large trees and tree roots damaging segments of sidewalk. The Project included localized sidewalk repair and tree root barriers. BKF’s scope of work included; pavement rehabilitation, curb, gutter, cross gutter and sidewalk replacement and the installation of ADA compliant curb ramps.

REFERENCE
City of Buena Park
Teddy Luong, PE
6650 Beach Blvd.

Buena Park CA 90280
Ph. (714) 562-3689
[email protected]

ROSECRANS PAVEMENT REHABILITATION PROJECT,
Buena Park, CA

CLIENT REFERENCES
City of Pico Rivera
Proposal for On-Call Engineering Services 25
The intersection of Los Alisos Boulevard and Muirlands Boulevard is within a residential and community/regional park area, with Los Alisos Boulevard classified as a Major Arterial and Muirlands Boulevard as a Primary Arterial. With Muirlands being heavily travelled and used as an alternate route to the Interstate 5-Freeway during peak hours, the City saw the need and intends to construct second left turn lanes for all legs of the intersection. In order to accommodate the dual left lanes for the Los Alisos Boulevard/ Muirlands Boulevard Intersection Improvements Project.. With the build-out conditions at the intersection of Los Alisos Boulevard and Muirlands Boulevard, the opportunities for the widening occur on the east side of Muirlands Boulevard impacting the Los Alisos Intermediate School and El Toro Park on the upstream side of the Muirlands Bridge over the Los Alisos Creek.

REFERENCE
City of Lake Forest
Tran Tran
100 Civic Center Drive
Lake Forest CA 92630
Ph. (949) 467-3485
[email protected]
LOS ALISOS BLVD./MUIRLANDS BLVD. INTERSECTION
IMPROVEMENTS PROJECT, Lake Forest, CA
BKF with the Project Team developed a scenario that optimized the intersection traffic operations beyond the alternatives and scenarios identified in the RFP, and developed the Geometric Approval Drawing (GAD), preliminary design plans, and prepared the Project Report, Environmental Document, Preliminary Water Quality Management Plan. As part of the Project, traffic simulations were created for the Preferred Alternative/Scenario to be used during the Transportation and Planning Commissions, and the City Council. BKF also prepared right of way exhibits for each property impacted by the project improvements, which were used to discuss the project with the property owners.

REFERENCE
City of Irvine
Cheryl Lea
1 Civic Center Plaza
Irvine CA 92675
Ph. (949) 724-7313
[email protected]

JAMBOREE/MAIN INTERSECTION ENHANCEMENTS,
Irvine, CA

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 26

BKF ENGINEERS PROFESSIONAL SERVICES RATE SCHEDULE
EFFECTIVE JANUARY 1, 2024
Rates effective for the duration of the contract

CLASSIFICATION HOURLY RATE

PROJECT MANAGEMENT
Principal $314.00
Senior Associate Principal $291.00
Associate Principal $284.00
Senior Project Manager | Senior Technical Manager $276.00 Project Manager | Technical Manager $270.00
Engineering Manager | Surveying Manager | Planning Manager $249.00

TECHNICAL STAFF
Senior Project Engineer | Senior Project Surveyor | Senior Project Planner $231.00 Project Engineer | Project Surveyor | Project Planner $203.00 Design Engineer | Staff Surveyor | Staff Planner $177.00 BIM Specialist I, II, III $177.00 - $203.00 - $231.00
Technician I, II, III, IV $168.00 - $179.00 - $197.00 - $211.00 Drafter I, II, III, IV $132.00 - $145.00 - $156.00 - $174.00 Engineering Assistant | Surveying Assistant | Planning Assistant $110.00

FIELD SURVEYING
Survey Party Chief $231.00
Instrument Person $198.00
Survey Chainperson $149.00
Utility Locator I, II, III, IV $121.00 - $171.00 - $205.00 - $233.00 Apprentice I, II, III, IV $92.00 - $123.00 - $135.00 - $144.00

CONSTRUCTION ADMINISTRATION
Senior Consultant $302.00
Senior Construction Administrator $263.00
Resident Engineer $196.00
Field Engineer I, II, III $177.00 - $203.00 - $231.00

FUNDING & GRANT MANAGEMENT
Director of Funding Strategies $216.00
Funding Strategies Manager $198.00
Funding/Research Analyst I, II, III, IV $135.00 - $156.00 - $166.00 - $183.00

PROJECT ADMINISTRATION
Project Coordinator $148.00
Senior Project Assistant $127.00
Project Assistant $112.00
Clerical | Administrative Assistant $94.00
Expert witness rates are available upon request.

Subject to the terms of a services agreement:
• Charges for outside services, equipment, materials, and facilities not furnished directly by BKF Engineers will be billed as reimbursable expenses at cost plus 10%. Such charges may include, but shall not be limited to: printing and reproduction services; shipping, delivery, and courier charges; subconsultant fees and expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable materials. • Allowable mileage will be charged at the prevailing IRS rate per mile. • Monthly invoices are due within 30 days from invoice date. Interest will be charged at 1.5% per month on past due accounts.

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 27
1 CITY OF PICO RIVERA –
ON‐C ALL E NGINEERING SERVICES

PRICING PROPOSAL
Job Classification Hourly Rate1,2
Environmental/Technical Services
Principal $335
Associate Planner/Scientist/Technical Specialist $245
Senior Planner/Scientist/Technical Specialist $215
Traffic Engineer $185
Planner/Scientist/Technical Specialist $160
Assistant Planner/Scientist/Technical Specialist $140
Field Services
Senior Field Crew/Field Crew $130
Office Services
Senior GIS/Graphics $195
Graphics/GIS $155
Office Assistant $105
Project Assistant $125
Senior Technical Editor $155
Word Processor/Technical Editor $135 1 The hourly rate for work involving actual expenses in court (e.g., giving depositions or similar expert testimony) will be billed at $400 per hour regardless of job classifications. 2 These rates are valid for the entire duration of the contract (June 30, 2026).

LSA IN‐HOUSE DIRECT EXPENSES 1
Description Unit Cost Description Unit Cost
Reproduction (8.5 x 11) B/W $0.07 per page Total Station Surveying Instrument $50.00 per day Reproduction (8.5 x 11) Color $0.40 per page Level (Laser or Optical) $25.00 per day Reproduction (11 x 17) B/W $0.10 per page Laser Rangefinder $25.00 per day Reproduction (11 x 17) Color $0.75 per page Sound Meter $75.00 per day CD Production $5.00 per CD Sound Meter with Velocity Transducer $85.00 per day USB Flash Drive $5.00 per drive Aerial Photo Cost
Plotting $3.75 per sq ft Boat Rental Cost
Aerial Drone $200.00 per day Water Quality Meter $25.00 per day Mileage On‐Road Current federal rate Night Vision Goggles $50.00 per unit per night Mileage Off‐Road Current federal rate Wildlife Camera $25.00 per day GPS Unit $75.00 per day Outside Reproduction Cost 1 Direct costs shall be reimbursed at cost plus 10 percent. 17800 Newhope Street, Suite B, Fountain Valley, California 92708  Tel: (714) 751-3826 EARTH MECHANICS, INC. FEE SCHEDULE
2024 – 2028
City of Pico Rivera
On-Call Engineering Services
Rates effective for the term of the PSA
Classification Fully Burdened
Hourly Rate
Principal/Senior Consultant $ 334.00
Principal Engineer/Geologist $ 333.00
Senior Engineer/Geologist $ 247.00
Senior Project Geologist $ 225.00
Project Engineer/Geologist $ 192.00
Senior Staff Engineer/Geologist $ 169.00
Staff Engineer/Geologist $ 148.00
Senior Technician $ 172.00
Technician* $ 89.00
Project Analyst $ 162.00
* Non-exempt staff subject to overtime pay per California law.

Reimbursable expenses including, but not limited to, drilling, traffic control, waste disposal, specialty testing, and private utility location services will be reimbursed at actual cost with supporting invoice.

Charges invoiced for travel, lodging, and subsistence shall not exceed the current Caltrans rates.

Combined Overhead Rate = 170.68%
Profit = 10 %
Ninyo & Moore | City of Pico Rivera, On-Call CM and Inspection Serivces | 04-04368. | January 22, 2024 CA16 Schedule of Fees
Hourly Charges for Personnel
Professional Staff
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 250 Senior Engineer/Geologist/Environmental Scientist ................................................................................................ $ 235 Senior Project Engineer/Geologist/Environmental Scientist.................................................................................... $ 220 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 210 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 200 Staff Engineer/Geologist/Environmental Scientist ................................................................................................... $ 180 GIS Analyst............................................................................................................................................................... $ 160 Technical Illustrator/CAD Operator .......................................................................................................................... $ 140 Field Staff
Certified Asbestos/Lead Technician ........................................................................................................................ $ 220 Field Operations Manager........................................................................................................................................ $ 150 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 145 Supervisory Technician ............................................................................................................................................ $ 140 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing)............................................. $ 135 Senior Technician..................................................................................................................................................... $ 135 Technician ................................................................................................................................................................ $ 130 Administrative Staff
Information Specialist ............................................................................................................................................... $ 120 Geotechnical/Environmental/Laboratory Assistant .................................................................................................. $ 120 Data Processor ......................................................................................................................................................... $ 95 Other Charges
Concrete Coring Equipment (includes technician) .............................................................................................. $ 190/hr Anchor Load Test Equipment (includes technician) ............................................................................................ $ 190/hr GPR Equipment ................................................................................................................................................... $ 180/hr Inclinometer .......................................................................................................................................................... $ 100/hr Hand Auger Equipment ....................................................................................................................................... $ 80/hr Rebar Locator (Pachometer) ............................................................................................................................... $ 25/hr Vapor Emission Kit ............................................................................................................................................... $ 65/kit Field Equipment ................................................................................................................................................... $ 12/hr X-Ray Fluorescence ............................................................................................................................................ $ 70/hr PID/FID................................................................................................................................................................. $ 25/hr Air Sampling Pump .............................................................................................................................................. $ 10/hr Field Vehicle ......................................................................................................................................................... $ 15/hr Expert Witness Testimony ................................................................................................................................... $ 450/hr Direct Expenses ..................................................................................................................................... Cost plus 15 % Special equipment charges will be provided upon request.

Notes
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays.

Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding 4 hours.

Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid within 30 days.

Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the project, as applicable.

Ninyo & Moore | 2021 Laboratory Testing
Schedule of Fees for Laboratory Testing

SOILS CONCRETE
Atterberg Limits, D 4318, CT 204 ............................................................. $ 170 Compression Tests, 6x12 Cylinder, C 39 ...................................................$ 35 California Bearing Ratio (CBR), D 1883................................................... $ 550 Concrete Mix Design Review, Job Spec.....................................................$ 300 Chloride and Sulfate Content, CT 417 & CT 422 .................................... $ 175 Concrete Mix Design, per Trial Batch, 6 cylinder, ACI ...............................$ 850 Consolidation, D 2435, CT 219................................................................. $ 300 Concrete Cores, Compression (excludes sampling), C 42........................$ 120 Consolidation, Hydro-Collapse only, D 2435 ........................................... $ 150 Drying Shrinkage, C 157..............................................................................$ 400 Consolidation – Time Rate, D 2435, CT 219 ........................................... $ 200 Flexural Test, C 78 .......................................................................................$ 85 Direct Shear – Remolded, D 3080............................................................ $ 350 Flexural Test, C 293 .....................................................................................$ 85 Direct Shear – Undisturbed, D 3080......................................................... $ 300 Flexural Test, CT 523...................................................................................$ 95 Durability Index, CT 229............................................................................ $ 175 Gunite/Shotcrete, Panels, 3 cut cores per panel and test, ACI ................$ 275 Expansion Index, D 4829, IBC 18-3 ......................................................... $ 190 Lightweight Concrete Fill, Compression, C 495 .........................................$ 80 Expansion Potential (Method A), D 4546................................................. $ 170 Petrographic Analysis, C 856.......................................................................$ 2,000 Geofabric Tensile and Elongation Test, D 4632...................................... $ 200 Restrained Expansion of Shrinkage Compensation...................................$ 450 Hydraulic Conductivity, D 5084................................................................. $ 350 Splitting Tensile Strength, C 496 .................................................................$ 100 Hydrometer Analysis, D 6913, CT 203..................................................... $ 220 3x6 Grout, (CLSM), C 39 .............................................................................$ 55 Moisture, Ash, & Organic Matter of Peat/Organic Soils .......................... $ 120 2x2x2 Non-Shrink Grout, C 109 .................................................................$ 55 Moisture Only, D 2216, CT 226 ................................................................ $ 35 Moisture and Density, D 2937 ................................................................... $ 45 ASPHALT Permeability, CH, D 2434, CT 220 ........................................................... $ 300 Air Voids, T 269 ............................................................................................$ 85 pH and Resistivity, CT 643........................................................................ $ 175 Asphalt Mix Design, Caltrans (incl. Aggregate Quality) .............................$ 4,500 Proctor Density D1557, D 698, CT 216, AASHTO T-180....................... $ 220 Asphalt Mix Design Review, Job Spec........................................................$ 180 Proctor Density with Rock Correction D 1557.......................................... $ 340 Dust Proportioning, CT LP-4........................................................................$ 85 R-value, D 2844, CT 301........................................................................... $ 375 Extraction, % Asphalt, including Gradation, D 2172, CT 382 ....................$ 250 Sand Equivalent, D 2419, CT 217 ............................................................ $ 125 Extraction, % Asphalt without Gradation, D 2172, CT 382........................$ 150 Sieve Analysis, D 6913, CT 202 ............................................................... $ 145 Film Stripping, CT 302..................................................................................$ 120 Sieve Analysis, 200 Wash, D 1140, CT 202............................................ $ 100 Hveem Stability and Unit Weight D 1560, T 246, CT 366..........................$ 225 Specific Gravity, D 854.............................................................................. $ 125 Marshall Stability, Flow and Unit Weight, T 245.........................................$ 240 Thermal Resistivity (ASTM 5334, IEEE 442)........................................... $ 925 Maximum Theoretical Unit Weight, D 2041, CT 309..................................$ 150 Triaxial Shear, C.D, D 4767, T 297........................................................... $ 550 Moisture Content, CT 370............................................................................$ 95 Triaxial Shear, C.U., w/pore pressure, D 4767, T 2297 per pt................ $ 450 Moisture Susceptibility and Tensile Stress Ratio, T 238, CT 371 .............$ 1,000 Triaxial Shear, C.U., w/o pore pressure, D 4767, T 2297 per pt.......................$ 350 Slurry Wet Track Abrasion, D 3910.............................................................$ 150 Triaxial Shear, U.U., D 2850 ..................................................................... $ 250 Superpave, Asphalt Mix Verification (incl. Aggregate Quality) ..................$ 4,900 Unconfined Compression, D 2166, T 208................................................ $ 180 Superpave, Gyratory Unit Wt., T 312 ..........................................................$ 100 Superpave, Hamburg Wheel, 20,000 passes, T 324.................................$ 1,000 MASONRY Unit Weight sample or core, D 2726, CT 308 ............................................. $ 100 Brick Absorption, 24-hour submersion, 5-hr boiling, 7-day, C 67........... $ 70 Voids in Mineral Aggregate, (VMA) CT LP-2..............................................$ 90 Brick Compression Test, C 67 .................................................................. $ 55 Voids filled with Asphalt, (VFA) CT LP-3.....................................................$ 90 Brick Efflorescence, C 67.......................................................................... $ 55 Wax Density, D 1188................................................................................... $ 140 Brick Modulus of Rupture, C 67 ................................................................ $ 50 Brick Moisture as received, C 67 .............................................................. $ 45 AGGREGATES Brick Saturation Coefficient, C 67............................................................. $ 60 Clay Lumps and Friable Particles, C 142....................................................$ 180 Concrete Block Compression Test, 8x8x16, C 140................................. $ 70 Cleanness Value, CT 227 ............................................................................$ 180 Concrete Block Conformance Package, C 90 ......................................... $ 500 Crushed Particles, CT 205...........................................................................$ 175 Concrete Block Linear Shrinkage, C 426 ................................................. $ 200 Durability, Coarse or Fine, CT 229..............................................................$ 205 Concrete Block Unit Weight and Absorption, C 140................................ $ 70 Fine Aggregate Angularity, ASTM C 1252, T 304, CT 234 .......................$ 180 Cores, Compression or Shear Bond, CA Code....................................... $ 70 Flat and Elongated Particle, D 4791............................................................$ 220 Masonry Grout, 3x3x6 prism compression, C 39 .................................... $ 45 Lightweight Particles, C 123.........................................................................$ 180 Masonry Mortar, 2x2 cube compression, C 109...................................... $ 35 Los Angeles Abrasion, C 131 or C 535.......................................................$ 200 Masonry Prism, half size, compression, C 1019...................................... $ 120 Material Finer than No. 200 Sieve by Washing, C 117..............................$ 90 Masonry Prism, Full size, compression, C 1019...................................... $ 200 Organic Impurities, C 40...............................................................................$ 90 Potential Alkali Reactivity, Mortar Bar Method, Coarse, C 1260...............$ 1,250 REINFORCING AND STRUCTURAL STEEL Potential Alkali Reactivity, Mortar Bar Method, Fine, C 1260 .................... $ 950 Chemical Analysis, A 36, A 615................................................................ $ 135 Potential Reactivity of Aggregate (Chemical Method), C 289 ...................$ 475 Fireproofing Density Test, UBC 7-6.......................................................... $ 90 Sand Equivalent, T 176, CT 217 .................................................................$ 125 Hardness Test, Rockwell, A 370............................................................... $ 80 Sieve Analysis, Coarse Aggregate, T 27, C 136 ........................................$ 120 High Strength Bolt, Nut & Washer Conformance, Sieve Analysis, Fine Aggregate (including wash), T 27, C 136.................$ 145 per assembly, A 325............................................................................. $ 150 Sodium Sulfate Soundness, C 88................................................................$ 450 Mechanically Spliced Reinforcing Tensile Test, ACI ............................... $ 175 Specific Gravity and Absorption, Coarse, C 127, CT 206..........................$ 115 Pre-Stress Strand (7 wire), A 416............................................................. $ 170 Specific Gravity and Absorption, Fine, C 128, CT 207...............................$ 175 Reinforcing Tensile or Bend up to No. 11, A 615 & A 706..................... $ 75 Structural Steel Tensile Test: Up to 200,000 lbs., A 370 ........................ $ 90 ROOFING Welded Reinforcing Tensile Test: Up to No. 11 bars, ACI...................... $ 80 Roofing Tile Absorption, (set of 5), C 67 .....................................................$ 250 Roofing Tile Strength Test, (set of 5), C 67.................................................$ 250 Special preparation of standard test specimens will be charged at the technician’s hourly rate.

Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 28
Stantec Consulting Services Inc. A1. Civil Engineering Design 1 Stantec Consulting Services Inc.

LABOR CLASSIFICATION HOURLY RATE
LEVEL 17
Principal
QA/QC Manager
Sr. Transportation Specialist
$278.00
$278.00
$278.00
LEVEL 16
Sr. Project Manager $269.00
LEVEL 15
Project Manager
Sr. Architect
Environmental Services Manager
Structural Engineer
Survey
Mapping
Right-of-Way Manager
$244.00
$244.00
$244.00
$244.00
$244.00
$244.00
$244.00
LEVEL 14
Deputy Project Manager
Task Manager
Field Survey Manager
Sr. Project Engineer
Sr. Traffic Engineer
Sr. Project Surveyor
$230.00
$230.00
$230.00
$230.00
$230.00
$230.00
LEVEL 13
Sr. Engineer
Project Engineer
Project Architect
Project Surveyor
Sr. Transportation Planner
Geotechnical Engineer
Landscape Architect
Senior Scientist II
Transportation Specialist
Field Survey Coordinator
Traffic Engineer II
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
LEVEL 12
Civil Engineer
Architect
Surveyor
Transportation Planner
Traffic Engineer I
Design Engineer
Architect Job Captain
Senior Scientist I
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
PRICING PROPOSAL T5
Rates effective for the term of the PSA
Stantec Consulting Services Inc. A1. Civil Engineering Design 2

LABOR CLASSIFICATION HOURLY RATE
LEVEL 11
Engineering and Landscape Designer
Survey Technician
Associate Scientist II
$198.00
$198.00
$198.00
LEVEL 10
Senior Designer
CAD Technician
Associate Scientist I
Jr. Survey Technician
Asst. Engineer III
$182.00
$182.00
$182.00
$182.00
$182.00
LEVEL 9
Design Technician
CAD Technician
Asst. Engineer II
Sr. Project Coordinator
Project Scientist II
Assistant Planner
$176.00
$176.00
$176.00
$176.00
$176.00
$176.00
LEVEL 8
Project Coordinator
Junior Engineer
Asst. Engineer I
Project Scientist I
$17000
$170.00
$170.00
$170.00
LEVEL 7
Administrative Support
Processing
Lab Tech
Staff Scientist III
$160.00
$160.00
$160.00
$160.00
LEVEL 6
Staff Scientist II $150.00
LEVEL 5
Staff Scientist I $146.00
LEVEL 4
Junior Level Position $128.00
LEVEL 3
Junior Level Position $117.00
1-PERSON SURVEY CREW
2-PERSON SURVEY CREW
3-PERSON SURVEY CREW

OVERTIME RATES
1-PERSON SURVEY CREW OVERTIME RATE
2-PERSON SURVEY CREW OVERTIME RATE
3-PERSON SURVEY CREW OVERTIME RATE
Reimbursable expenses will be billed at cost.
$220.00
$345.00
$470.00
$275.00
$455.00
$635.00
Expert Witness Services carry a 50% premium on labor. Overtime may be charged at 1.5 times the standard billing rate.

All labor rates are fixed for the term of the contract. If contract is extended beyond the original term, rates will be subject to increases.

T-2 2024

MONUMENT

HOURLY RATE SCHEDULE
Right of Way Management & Implementation
Program Manager / Principal $290.00 per hour
Senior Project Manager / Sr. Utility Project Manager $210.00 per hour ROW Project Manager 2 / Utility Project Manager 2 $190.00 per hour ROW Project Manager 1 / Utility Project Manager 1 $160.00 per hour Utility Coordinator $130.00 per hour
Senior Acquisition Agent / Senior Relocation Agent / Senior Analyst $145.00 per hour
Acquisition Agent 2 / Relocation Agent 2 / Property Manager $120.00 per hour Acquisition Agent 1/ Relocation Agent 1 $110.00 per hour Senior Project Coordinator $120.00 per hour
Project Coordinator 2 $110.00 per hour
Project Coordinator 1 $100.00 per hour
Senior Project Analyst $135.00 per hour
Project Analyst $110.00 per hour
Researcher $90.00 per hour
Project Support / Administrative
Professional Staff $85.00 per hour
Project Controller 2 $100.00 per hour
Project Controller 1 $75.00 per hour
Project Support Specialist $75.00 per hour
The above hourly rates are exclusive of local travel/mileage, photocopying, first class postage and overnight courier service. These expenses including out-of-pocket expenses such as pre-approved travel and lodging, outside exhibit preparation, requested overnight courier or registered and/or certified mail (return receipt requested) charges, and specialty reproduction (unless otherwise specified) are in addition to the contract amount and will be charged at cost plus ten percent (+10%) for administration, coordination, and handling. Subcontracted services, other than those listed above, will be invoiced at cost plus ten percent (+10%).

In the event Monument is required to perform any act in relation to litigation arising out of any project with the Client (for example, expert consulting, responding to a complaint, or proceeding with discovery and trial), such services are not part of this contract, nor are they part of our normal fees.

If required, these types of services will be invoiced at two times the regular hourly rates.

In the event this contract extends beyond the initial term of the PSA, the hourly rates and any remaining amount in the contract shall be adjusted upwardly by five percent (5%) per annum, compounded annually, on the anniversary date of this contract.

Written communication services in other languages would be an additional cost and would be billed separately based on quoted hourly rates by independent translation services. Verbal communication in Spanish, if necessary, will be included at no additional charge.

Monument will submit monthly invoices for the professional and trade services rendered based on the hourly rate schedule provided above. The client shall promptly pay the uncontested amount due within no more than thirty (30) days after receipt of invoice. Upon completion of services, the remaining unbilled amount of the project balance shall become immediately due and payable.

MIG Schedule of Fees/Hourly Rates 2024 through 2028

CLASSIFICATION FIVE YEAR

AVERAGE
Principal $250
Senior Project Manager $215
Project Manager $205
Deputy Project Manager $145
Landscape Architect $150
Irrigation Designer $180
Project Associate $140
Senior Project Accountant $190
Project Administrative Support $115

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 29
Schedule of Fees and General Terms
Personnel Charges - Professional Staff
Product Name Units Rate ($)
Project Engineer ‐ Laboratory HR $190.00
Administrative HR $70.00
Principal Engineer ‐ Office HR $220.00
Principal Engineer ‐ Field HR $220.00
Principal Engineer ‐ Consultation HR $220.00
Principal Engineer ‐ Job Conference HR $220.00
Principal Engineer ‐ Expert Witness HR $500.00
Project Engineer ‐ Consultation HR $190.00
Principal Engineer ‐ Court Appearance HR $600.00
Project Engineer ‐ Office HR $190.00
Project Engineer ‐ Field HR $190.00
Project Engineer ‐ Job Conference HR $190.00
Staff Engineer ‐ Office HR $145.00
Staff Engineer ‐ Field HR $145.00
Drafting HR $110.00
Project Manager ‐ Office HR $165.00
Principal Geologist ‐ Field HR $200.00
Project Manager ‐  Field HR $165.00
Project Manager ‐ Job Conference HR $165.00
Principal Geologist ‐ Office HR $200.00
Principal Geologist ‐ Consultation HR $200.00
Principal Geologist ‐ Job Conference HR $200.00
Principal Geologist ‐ Expert Witness HR $450.00
Principal Geologist ‐ Court Appearance HR $550.00
Project Geologist ‐ Office HR $180.00
Qualified SWPPP Developer QSD HR $160.00
Project Geologist ‐ Field HR $180.00
Project Geologist ‐ Consultation HR $180.00
Project Geologist ‐ Job Conference HR $180.00
Staff Geologist ‐ Office HR $145.00
Staff Geologist ‐ Field HR $145.00
Qualified SWPPP Practitioner QSP HR $150.00
Personnel Charges - Field Staff
Product Name Units Rate ($)
Soils Engineering Technician HR $130.00
Soils Technician Compaction Testing HR $130.00
Soils Technician Rough Grading HR $130.00
Soils Technician Retesting HR $130.00
Public Works Inspector HR $135.00
Public Works Technician HR $130.00
Public Works Inspector ‐ Asphalt Paving HR $130.00
Public Works Inspector ‐ Asphalt Plant HR $130.00
Public Works Inspector ‐ Concrete Paving HR $130.00
Public Works Inspector ‐ Concrete Plant HR $130.00
Public Works Technician ‐ Asphalt HR $130.00
Public Works Technician ‐ Concrete HR $130.00
Laboratory Technician ‐ Field Lab HR $120.00
Lead Roadway and Structures Inspector HR $140.00
Structures Inspector HR $140.00
Roadway Inspector HR $130.00
Civil Inspector HR $135.00
Building Inspector HR $140.00
Schedule of Fees and General Terms
ASTM D244 Emulsion Sieve Analysis EA $185.00
ASTM D3910 Wet Track Abrasion EA $285.00
AASHTO T324 Hamburg Wheel Tracking Test EA $1,100.00
AASHTO T283 Tensile Strength Ratio EA $1,200.00
AASHTO T275 Core Denisty Paraffin Coated EA $85.00
AASHTO T312/T275 LTMD Gyratory Compactor EA $480.00
AASHTO T308 Asphalt Content by Ignition EA $285.00
AASHTO T308A AC Correction Factor EA $550.00
AASHTO T209 Theoretical Maximum Density EA $295.00
AASHTO T324 Hamburg Wheel Tracking ‐ RHMA EA $1,100.00
AASHTO T283 Tensile Strength Ratio ‐ RHMA EA $1,200.00
AASHTO T312/T275 LTMD Gyratory Comp.‐ RHMA EA $480.00
Laboratory Tests - Aggregates
Product Name Units Rate ($)
ASTM C131 Abrasion, Los Angeles Rattler EA $375.00
ASTM C40 Organic Impurities in Fine Agg EA $135.00
ASTM C127 Specific Gravity, Coarse Agg EA $255.00
ASTM C128 Specific Gravity, Fine Agg EA $290.00
ASTM C1252 Angularity & Voids, Fine Agg EA $280.00
ASTM C566 Moisture Content by Drying EA $35.00
ASTM C117 Materials Finer than No. 200 EA $160.00
ASTM D2419 Sand Equivalent EA $180.00
ASTM C289 Alkali‐Silica Reactivity EA $950.00
ASTM D4791 Flat & Elongated Particles EA $395.00
ASTM D5821 Percent Fractured Particles EA $275.00
ASTM C123 Percent Lightweight Particles EA $295.00
ASTM C88 Soundness by Sodium Sulfate EA $635.00
ASTM C136 Sieve Analysis, Fine Agg EA $265.00
ASTM C136 Sieve Analysis, Combined Agg EA $290.00
ASTM C136 Sieve Analysis, Coarse Agg EA $255.00
ASTM C142 Clay Lumps & Friable Particles EA $260.00
ASTM C535, Abrasion Large Aggregate EA $465.00
AASHTO T304 Angularity & Voids in Fines EA $255.00
AASHTO T84 Specific Gravity, Fine Agg EA $280.00
AASHTO T85 Specific Gravity, Coarse Agg EA $255.00
AASHTO T27 Sieve Analysis, Combined Agg EA $290.00
AASHTO T96 Abrasion, Los Angeles Rattler EA $375.00
AASHTO T27 Sieve Analysis, Fine Agg EA $285.00
AASHTO T27 Sieve Analysis, Coarse Agg EA $255.00
AASHTO T335 Percent Fractured Particles EA $255.00
AASHTO T176 Sand Equivalent EA $180.00
Equipment Charges
Product Name Units Rate ($)
Portable Drilling Equipment HR $750.00
Mobile Laboratory Trailer Mobilization EA $1,500.00
Mobile Laboratory Trailer & Testing Equipment DAY $700.00 Stationary Laboratory Trailer & Testing Equipment MO $1,500.00 Mileage MILE Quote
Diamond Bit Core Rig and Generator DAY $750.00
Nuclear Density Test Gauge DAY $35.00
Hand Held Turbidity Meter DAY $50.00
Ultrasonic Test Unit and Consumables DAY $100.00
Magnetic Particle Test Unit DAY $100.00
Name on Org Chart Company Job Title Hourly Rate**
Monica Villalobos President | Principal $274.07
Jason Cheng Transportation Planner $92.52
Gema Martinez‐ Castillo Planner/Designer (If Needed) 82.01 **Hourly ratesreflect all costs for office overhead, including direct and indirect costs. The Schedule of Hourly Rates shall remain fixed for the term of the PSA.

Schedule of Fees and General Terms
Skidmore DAY $80.00
Schmidt Hammer DAY $100.00
Torque Wrench DAY $80.00
Proof Load Testing Equipment DAY $150.00
Drilling Equip Mobilization / De‐Mob EA $800.00
ASTM C1028 Coefficient of Friction DAY $800.00
Mini Environmental Quality Meter DAY $400.00
Inertial Profiler DAY $2,000.00
Materials / Supplies LS Quote
Holiday Tester DAY $250.00
VOC Meter DAY $200.00
Misc Permits LS Quote
Misc Fees HR Quote
Misc Subconsultant LS Quote
Set of Aerial Photographs EA Quote
Blueprinting EA Quote
Dutch Cone Penetrometer with Operator HR $875.00
Hollow Stem Auger Drill Rig w/ Operator HR $775.00
Portable Drilling Equipment w/ Operator HR $750.00
Bucket Auger Drill Rig with Operator HR $875.00
Air Rotary Drill Rig with Operator HR $900.00
Rotary Wash Drill Rig with Operator HR $950.00
Per Diem DAY $150.00
Schedule of Fees and General Terms

TERMS AND CONDITIONS

GENERAL CHARGES
RMA Group requirestwenty‐four (24) hour prior notification forscheduling inspectors and/or technicians.

Inspection chargesstart at the scheduled show up time at the job site.  All inspection hours will be billed in the following increments:

There will be a minimum two (2) hour charge for any RMA Group employee presence on site.

Any time less than four (4) hours of work will be billed as four (4) hours.

Four (4) to eight (8) hours will be billed as eight (8) hours.

When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due to project constraints, ½ hour will be charged at double time rates in addition to any applicable hours worked.

Rates are valid through June 30, 2024. Rates for personnel will increase by 5% per year on July 1st of each subsequent year.

Outside services will be billed at cost plus 15% unless billed directly to and paid for by Client.

Requests made by client for management attendance at meetings at the projectsite will be charged atstandard rate.

Administrative/clerical support will be charged at 3% of the monthly direct charges.

OVERTIME CHARGES
Work performed in excess of 8 hours per day and / or up to eight (8) hours on Saturdays will be billed at 1.50 timesthe unit rate.

Work performed on Sunday, recognized holidays, or in excess of eight (8) hours on Saturdays will be billed at 2.00 times the unit rate.

A 20% surcharge will be applied for laboratory tests performed on a Saturday or Sunday.

PER DIEM AND TRAVEL CHARGES
A $150.00 charge per day will be applied when our personnel are required to stay overnight at remote locations. Time will be billed at the unit rate while traveling to a remote location or if a location requires an overnight Mileage forstaytravel outside a 50 mile radius from either the projectsite or the nearest RMA facility whichever is closest, will be charged at a rate of $0.60 per mile.

NIGHT WORK
A $10.00 per hour surcharge will be added to all personnel rates for work performed during night shifts.

RMA Group is a multi dicipline firm with additional service sector rates that may not be inluded in the rates shown above . Full 8 page rates sheet available upon request

EXCEPTIONS OR ADDITIONS
City of Pico Rivera
Proposal for On-Call Engineering Services 30
Our Team has reviewed the City’s Agreement provided in the RFP.  While we can accept the Agreement, we would like to present the following edits for you consideration:

Section 5.2 ‐ Consultant shall perform all work in a manner consistent with and limited to that degree of care and skill ordinarily exercised by members of the same profession concurrently practicing under similar circumstances at the same time and in the same or similar locality (the “Standard of Care”). to the highest professional standards of consultants profession and in a manner reasonably satisfactory to City.

Section 15.1 ‐ The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteersshould, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the negligent performance of this Agreement. Accordingly, the provisions of thisindemnity provision are intended by the Partiesto be interpreted and construed to provide the fullest extent permitted by protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

Section 15.2 ‐ To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claimsthat arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant Section 25 – WARRANTIES REPRESENTATIONS

CONTACT

CHRIS RIDEOUT, PE
(949) 526-8462
[email protected]

SHEILA AMPARO, PE
(949) 526-8478
[email protected]
BKF Engineers
4675 MacArthur Court, Suite 400
Newport Beach CA 92660
www.bkf.com

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 26

BKF ENGINEERS PROFESSIONAL SERVICES RATE SCHEDULE
EFFECTIVE JANUARY 1, 2024
Rates effective for the duration of the contract

CLASSIFICATION HOURLY RATE

PROJECT MANAGEMENT
Principal $314.00
Senior Associate Principal $291.00
Associate Principal $284.00
Senior Project Manager | Senior Technical Manager $276.00 Project Manager | Technical Manager $270.00
Engineering Manager | Surveying Manager | Planning Manager $249.00

TECHNICAL STAFF
Senior Project Engineer | Senior Project Surveyor | Senior Project Planner $231.00 Project Engineer | Project Surveyor | Project Planner $203.00 Design Engineer | Staff Surveyor | Staff Planner $177.00 BIM Specialist I, II, III $177.00 - $203.00 - $231.00
Technician I, II, III, IV $168.00 - $179.00 - $197.00 - $211.00 Drafter I, II, III, IV $132.00 - $145.00 - $156.00 - $174.00 Engineering Assistant | Surveying Assistant | Planning Assistant $110.00

FIELD SURVEYING
Survey Party Chief $231.00
Instrument Person $198.00
Survey Chainperson $149.00
Utility Locator I, II, III, IV $121.00 - $171.00 - $205.00 - $233.00 Apprentice I, II, III, IV $92.00 - $123.00 - $135.00 - $144.00

CONSTRUCTION ADMINISTRATION
Senior Consultant $302.00
Senior Construction Administrator $263.00
Resident Engineer $196.00
Field Engineer I, II, III $177.00 - $203.00 - $231.00

FUNDING & GRANT MANAGEMENT
Director of Funding Strategies $216.00
Funding Strategies Manager $198.00
Funding/Research Analyst I, II, III, IV $135.00 - $156.00 - $166.00 - $183.00

PROJECT ADMINISTRATION
Project Coordinator $148.00
Senior Project Assistant $127.00
Project Assistant $112.00
Clerical | Administrative Assistant $94.00
Expert witness rates are available upon request.

Subject to the terms of a services agreement:
• Charges for outside services, equipment, materials, and facilities not furnished directly by BKF Engineers will be billed as reimbursable expenses at cost plus 10%. Such charges may include, but shall not be limited to: printing and reproduction services; shipping, delivery, and courier charges; subconsultant fees and expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable materials. • Allowable mileage will be charged at the prevailing IRS rate per mile. • Monthly invoices are due within 30 days from invoice date. Interest will be charged at 1.5% per month on past due accounts.

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 27
1 CITY OF PICO RIVERA –
ON‐C ALL E NGINEERING SERVICES

PRICING PROPOSAL
Job Classification Hourly Rate1,2
Environmental/Technical Services
Principal $335
Associate Planner/Scientist/Technical Specialist $245
Senior Planner/Scientist/Technical Specialist $215
Traffic Engineer $185
Planner/Scientist/Technical Specialist $160
Assistant Planner/Scientist/Technical Specialist $140
Field Services
Senior Field Crew/Field Crew $130
Office Services
Senior GIS/Graphics $195
Graphics/GIS $155
Office Assistant $105
Project Assistant $125
Senior Technical Editor $155
Word Processor/Technical Editor $135 1 The hourly rate for work involving actual expenses in court (e.g., giving depositions or similar expert testimony) will be billed at $400 per hour regardless of job classifications. 2 These rates are valid for the entire duration of the contract (June 30, 2026).

LSA IN‐HOUSE DIRECT EXPENSES 1
Description Unit Cost Description Unit Cost
Reproduction (8.5 x 11) B/W $0.07 per page Total Station Surveying Instrument $50.00 per day Reproduction (8.5 x 11) Color $0.40 per page Level (Laser or Optical) $25.00 per day Reproduction (11 x 17) B/W $0.10 per page Laser Rangefinder $25.00 per day Reproduction (11 x 17) Color $0.75 per page Sound Meter $75.00 per day CD Production $5.00 per CD Sound Meter with Velocity Transducer $85.00 per day USB Flash Drive $5.00 per drive Aerial Photo Cost
Plotting $3.75 per sq ft Boat Rental Cost
Aerial Drone $200.00 per day Water Quality Meter $25.00 per day Mileage On‐Road Current federal rate Night Vision Goggles $50.00 per unit per night Mileage Off‐Road Current federal rate Wildlife Camera $25.00 per day GPS Unit $75.00 per day Outside Reproduction Cost 1 Direct costs shall be reimbursed at cost plus 10 percent. 17800 Newhope Street, Suite B, Fountain Valley, California 92708  Tel: (714) 751-3826 EARTH MECHANICS, INC. FEE SCHEDULE
2024 – 2028
City of Pico Rivera
On-Call Engineering Services
Rates effective for the term of the PSA
Classification Fully Burdened
Hourly Rate
Principal/Senior Consultant $ 334.00
Principal Engineer/Geologist $ 333.00
Senior Engineer/Geologist $ 247.00
Senior Project Geologist $ 225.00
Project Engineer/Geologist $ 192.00
Senior Staff Engineer/Geologist $ 169.00
Staff Engineer/Geologist $ 148.00
Senior Technician $ 172.00
Technician* $ 89.00
Project Analyst $ 162.00
* Non-exempt staff subject to overtime pay per California law.

Reimbursable expenses including, but not limited to, drilling, traffic control, waste disposal, specialty testing, and private utility location services will be reimbursed at actual cost with supporting invoice.

Charges invoiced for travel, lodging, and subsistence shall not exceed the current Caltrans rates.

Combined Overhead Rate = 170.68%
Profit = 10 %
Ninyo & Moore | City of Pico Rivera, On-Call CM and Inspection Serivces | 04-04368. | January 22, 2024 CA16 Schedule of Fees
Hourly Charges for Personnel
Professional Staff
Principal Engineer/Geologist/Environmental Scientist/Certified Industrial Hygienist .............................................. $ 250 Senior Engineer/Geologist/Environmental Scientist ................................................................................................ $ 235 Senior Project Engineer/Geologist/Environmental Scientist.................................................................................... $ 220 Project Engineer/Geologist/Environmental Scientist ............................................................................................... $ 210 Senior Staff Engineer/Geologist/Environmental Scientist ....................................................................................... $ 200 Staff Engineer/Geologist/Environmental Scientist ................................................................................................... $ 180 GIS Analyst............................................................................................................................................................... $ 160 Technical Illustrator/CAD Operator .......................................................................................................................... $ 140 Field Staff
Certified Asbestos/Lead Technician ........................................................................................................................ $ 220 Field Operations Manager........................................................................................................................................ $ 150 Nondestructive Examination Technician (UT, MT, LP) ........................................................................................... $ 145 Supervisory Technician ............................................................................................................................................ $ 140 Special Inspector (Concrete, Masonry, Structural Steel, Welding, and Fireproofing)............................................. $ 135 Senior Technician..................................................................................................................................................... $ 135 Technician ................................................................................................................................................................ $ 130 Administrative Staff
Information Specialist ............................................................................................................................................... $ 120 Geotechnical/Environmental/Laboratory Assistant .................................................................................................. $ 120 Data Processor ......................................................................................................................................................... $ 95 Other Charges
Concrete Coring Equipment (includes technician) .............................................................................................. $ 190/hr Anchor Load Test Equipment (includes technician) ............................................................................................ $ 190/hr GPR Equipment ................................................................................................................................................... $ 180/hr Inclinometer .......................................................................................................................................................... $ 100/hr Hand Auger Equipment ....................................................................................................................................... $ 80/hr Rebar Locator (Pachometer) ............................................................................................................................... $ 25/hr Vapor Emission Kit ............................................................................................................................................... $ 65/kit Field Equipment ................................................................................................................................................... $ 12/hr X-Ray Fluorescence ............................................................................................................................................ $ 70/hr PID/FID................................................................................................................................................................. $ 25/hr Air Sampling Pump .............................................................................................................................................. $ 10/hr Field Vehicle ......................................................................................................................................................... $ 15/hr Expert Witness Testimony ................................................................................................................................... $ 450/hr Direct Expenses ..................................................................................................................................... Cost plus 15 % Special equipment charges will be provided upon request.

Notes
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged for work performed in excess of 8 hours in one day Monday through Friday and all day on Saturday. Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day, all day Sunday and on holidays.

Field technician and special inspection hours are charged at a 4-hour minimum, and 8-hour minimum for hours exceeding 4 hours.

Invoices are payable upon receipt. A service charge of 1.5 percent per month may be charged on accounts not paid within 30 days.

Our rates will be adjusted in conjunction with the increase in the Prevailing Wage Determination during the life of the project, as applicable.

Ninyo & Moore | 2021 Laboratory Testing
Schedule of Fees for Laboratory Testing

SOILS CONCRETE
Atterberg Limits, D 4318, CT 204 ............................................................. $ 170 Compression Tests, 6x12 Cylinder, C 39 ...................................................$ 35 California Bearing Ratio (CBR), D 1883................................................... $ 550 Concrete Mix Design Review, Job Spec.....................................................$ 300 Chloride and Sulfate Content, CT 417 & CT 422 .................................... $ 175 Concrete Mix Design, per Trial Batch, 6 cylinder, ACI ...............................$ 850 Consolidation, D 2435, CT 219................................................................. $ 300 Concrete Cores, Compression (excludes sampling), C 42........................$ 120 Consolidation, Hydro-Collapse only, D 2435 ........................................... $ 150 Drying Shrinkage, C 157..............................................................................$ 400 Consolidation – Time Rate, D 2435, CT 219 ........................................... $ 200 Flexural Test, C 78 .......................................................................................$ 85 Direct Shear – Remolded, D 3080............................................................ $ 350 Flexural Test, C 293 .....................................................................................$ 85 Direct Shear – Undisturbed, D 3080......................................................... $ 300 Flexural Test, CT 523...................................................................................$ 95 Durability Index, CT 229............................................................................ $ 175 Gunite/Shotcrete, Panels, 3 cut cores per panel and test, ACI ................$ 275 Expansion Index, D 4829, IBC 18-3 ......................................................... $ 190 Lightweight Concrete Fill, Compression, C 495 .........................................$ 80 Expansion Potential (Method A), D 4546................................................. $ 170 Petrographic Analysis, C 856.......................................................................$ 2,000 Geofabric Tensile and Elongation Test, D 4632...................................... $ 200 Restrained Expansion of Shrinkage Compensation...................................$ 450 Hydraulic Conductivity, D 5084................................................................. $ 350 Splitting Tensile Strength, C 496 .................................................................$ 100 Hydrometer Analysis, D 6913, CT 203..................................................... $ 220 3x6 Grout, (CLSM), C 39 .............................................................................$ 55 Moisture, Ash, & Organic Matter of Peat/Organic Soils .......................... $ 120 2x2x2 Non-Shrink Grout, C 109 .................................................................$ 55 Moisture Only, D 2216, CT 226 ................................................................ $ 35 Moisture and Density, D 2937 ................................................................... $ 45 ASPHALT Permeability, CH, D 2434, CT 220 ........................................................... $ 300 Air Voids, T 269 ............................................................................................$ 85 pH and Resistivity, CT 643........................................................................ $ 175 Asphalt Mix Design, Caltrans (incl. Aggregate Quality) .............................$ 4,500 Proctor Density D1557, D 698, CT 216, AASHTO T-180....................... $ 220 Asphalt Mix Design Review, Job Spec........................................................$ 180 Proctor Density with Rock Correction D 1557.......................................... $ 340 Dust Proportioning, CT LP-4........................................................................$ 85 R-value, D 2844, CT 301........................................................................... $ 375 Extraction, % Asphalt, including Gradation, D 2172, CT 382 ....................$ 250 Sand Equivalent, D 2419, CT 217 ............................................................ $ 125 Extraction, % Asphalt without Gradation, D 2172, CT 382........................$ 150 Sieve Analysis, D 6913, CT 202 ............................................................... $ 145 Film Stripping, CT 302..................................................................................$ 120 Sieve Analysis, 200 Wash, D 1140, CT 202............................................ $ 100 Hveem Stability and Unit Weight D 1560, T 246, CT 366..........................$ 225 Specific Gravity, D 854.............................................................................. $ 125 Marshall Stability, Flow and Unit Weight, T 245.........................................$ 240 Thermal Resistivity (ASTM 5334, IEEE 442)........................................... $ 925 Maximum Theoretical Unit Weight, D 2041, CT 309..................................$ 150 Triaxial Shear, C.D, D 4767, T 297........................................................... $ 550 Moisture Content, CT 370............................................................................$ 95 Triaxial Shear, C.U., w/pore pressure, D 4767, T 2297 per pt................ $ 450 Moisture Susceptibility and Tensile Stress Ratio, T 238, CT 371 .............$ 1,000 Triaxial Shear, C.U., w/o pore pressure, D 4767, T 2297 per pt.......................$ 350 Slurry Wet Track Abrasion, D 3910.............................................................$ 150 Triaxial Shear, U.U., D 2850 ..................................................................... $ 250 Superpave, Asphalt Mix Verification (incl. Aggregate Quality) ..................$ 4,900 Unconfined Compression, D 2166, T 208................................................ $ 180 Superpave, Gyratory Unit Wt., T 312 ..........................................................$ 100 Superpave, Hamburg Wheel, 20,000 passes, T 324.................................$ 1,000 MASONRY Unit Weight sample or core, D 2726, CT 308 ............................................. $ 100 Brick Absorption, 24-hour submersion, 5-hr boiling, 7-day, C 67........... $ 70 Voids in Mineral Aggregate, (VMA) CT LP-2..............................................$ 90 Brick Compression Test, C 67 .................................................................. $ 55 Voids filled with Asphalt, (VFA) CT LP-3.....................................................$ 90 Brick Efflorescence, C 67.......................................................................... $ 55 Wax Density, D 1188................................................................................... $ 140 Brick Modulus of Rupture, C 67 ................................................................ $ 50 Brick Moisture as received, C 67 .............................................................. $ 45 AGGREGATES Brick Saturation Coefficient, C 67............................................................. $ 60 Clay Lumps and Friable Particles, C 142....................................................$ 180 Concrete Block Compression Test, 8x8x16, C 140................................. $ 70 Cleanness Value, CT 227 ............................................................................$ 180 Concrete Block Conformance Package, C 90 ......................................... $ 500 Crushed Particles, CT 205...........................................................................$ 175 Concrete Block Linear Shrinkage, C 426 ................................................. $ 200 Durability, Coarse or Fine, CT 229..............................................................$ 205 Concrete Block Unit Weight and Absorption, C 140................................ $ 70 Fine Aggregate Angularity, ASTM C 1252, T 304, CT 234 .......................$ 180 Cores, Compression or Shear Bond, CA Code....................................... $ 70 Flat and Elongated Particle, D 4791............................................................$ 220 Masonry Grout, 3x3x6 prism compression, C 39 .................................... $ 45 Lightweight Particles, C 123.........................................................................$ 180 Masonry Mortar, 2x2 cube compression, C 109...................................... $ 35 Los Angeles Abrasion, C 131 or C 535.......................................................$ 200 Masonry Prism, half size, compression, C 1019...................................... $ 120 Material Finer than No. 200 Sieve by Washing, C 117..............................$ 90 Masonry Prism, Full size, compression, C 1019...................................... $ 200 Organic Impurities, C 40...............................................................................$ 90 Potential Alkali Reactivity, Mortar Bar Method, Coarse, C 1260...............$ 1,250 REINFORCING AND STRUCTURAL STEEL Potential Alkali Reactivity, Mortar Bar Method, Fine, C 1260 .................... $ 950 Chemical Analysis, A 36, A 615................................................................ $ 135 Potential Reactivity of Aggregate (Chemical Method), C 289 ...................$ 475 Fireproofing Density Test, UBC 7-6.......................................................... $ 90 Sand Equivalent, T 176, CT 217 .................................................................$ 125 Hardness Test, Rockwell, A 370............................................................... $ 80 Sieve Analysis, Coarse Aggregate, T 27, C 136 ........................................$ 120 High Strength Bolt, Nut & Washer Conformance, Sieve Analysis, Fine Aggregate (including wash), T 27, C 136.................$ 145 per assembly, A 325............................................................................. $ 150 Sodium Sulfate Soundness, C 88................................................................$ 450 Mechanically Spliced Reinforcing Tensile Test, ACI ............................... $ 175 Specific Gravity and Absorption, Coarse, C 127, CT 206..........................$ 115 Pre-Stress Strand (7 wire), A 416............................................................. $ 170 Specific Gravity and Absorption, Fine, C 128, CT 207...............................$ 175 Reinforcing Tensile or Bend up to No. 11, A 615 & A 706..................... $ 75 Structural Steel Tensile Test: Up to 200,000 lbs., A 370 ........................ $ 90 ROOFING Welded Reinforcing Tensile Test: Up to No. 11 bars, ACI...................... $ 80 Roofing Tile Absorption, (set of 5), C 67 .....................................................$ 250 Roofing Tile Strength Test, (set of 5), C 67.................................................$ 250 Special preparation of standard test specimens will be charged at the technician’s hourly rate.

Ninyo & Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 28
Stantec Consulting Services Inc. A1. Civil Engineering Design 1 Stantec Consulting Services Inc.

LABOR CLASSIFICATION HOURLY RATE
LEVEL 17
Principal
QA/QC Manager
Sr. Transportation Specialist
$278.00
$278.00
$278.00
LEVEL 16
Sr. Project Manager $269.00
LEVEL 15
Project Manager
Sr. Architect
Environmental Services Manager
Structural Engineer
Survey
Mapping
Right-of-Way Manager
$244.00
$244.00
$244.00
$244.00
$244.00
$244.00
$244.00
LEVEL 14
Deputy Project Manager
Task Manager
Field Survey Manager
Sr. Project Engineer
Sr. Traffic Engineer
Sr. Project Surveyor
$230.00
$230.00
$230.00
$230.00
$230.00
$230.00
LEVEL 13
Sr. Engineer
Project Engineer
Project Architect
Project Surveyor
Sr. Transportation Planner
Geotechnical Engineer
Landscape Architect
Senior Scientist II
Transportation Specialist
Field Survey Coordinator
Traffic Engineer II
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
$219.00
LEVEL 12
Civil Engineer
Architect
Surveyor
Transportation Planner
Traffic Engineer I
Design Engineer
Architect Job Captain
Senior Scientist I
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
$208.00
PRICING PROPOSAL T5
Rates effective for the term of the PSA
Stantec Consulting Services Inc. A1. Civil Engineering Design 2

LABOR CLASSIFICATION HOURLY RATE
LEVEL 11
Engineering and Landscape Designer
Survey Technician
Associate Scientist II
$198.00
$198.00
$198.00
LEVEL 10
Senior Designer
CAD Technician
Associate Scientist I
Jr. Survey Technician
Asst. Engineer III
$182.00
$182.00
$182.00
$182.00
$182.00
LEVEL 9
Design Technician
CAD Technician
Asst. Engineer II
Sr. Project Coordinator
Project Scientist II
Assistant Planner
$176.00
$176.00
$176.00
$176.00
$176.00
$176.00
LEVEL 8
Project Coordinator
Junior Engineer
Asst. Engineer I
Project Scientist I
$17000
$170.00
$170.00
$170.00
LEVEL 7
Administrative Support
Processing
Lab Tech
Staff Scientist III
$160.00
$160.00
$160.00
$160.00
LEVEL 6
Staff Scientist II $150.00
LEVEL 5
Staff Scientist I $146.00
LEVEL 4
Junior Level Position $128.00
LEVEL 3
Junior Level Position $117.00
1-PERSON SURVEY CREW
2-PERSON SURVEY CREW
3-PERSON SURVEY CREW

OVERTIME RATES
1-PERSON SURVEY CREW OVERTIME RATE
2-PERSON SURVEY CREW OVERTIME RATE
3-PERSON SURVEY CREW OVERTIME RATE
Reimbursable expenses will be billed at cost.
$220.00
$345.00
$470.00
$275.00
$455.00
$635.00
Expert Witness Services carry a 50% premium on labor. Overtime may be charged at 1.5 times the standard billing rate.

All labor rates are fixed for the term of the contract. If contract is extended beyond the original term, rates will be subject to increases.

T-2 2024

MONUMENT

HOURLY RATE SCHEDULE
Right of Way Management & Implementation
Program Manager / Principal $290.00 per hour
Senior Project Manager / Sr. Utility Project Manager $210.00 per hour ROW Project Manager 2 / Utility Project Manager 2 $190.00 per hour ROW Project Manager 1 / Utility Project Manager 1 $160.00 per hour Utility Coordinator $130.00 per hour
Senior Acquisition Agent / Senior Relocation Agent / Senior Analyst $145.00 per hour
Acquisition Agent 2 / Relocation Agent 2 / Property Manager $120.00 per hour Acquisition Agent 1/ Relocation Agent 1 $110.00 per hour Senior Project Coordinator $120.00 per hour
Project Coordinator 2 $110.00 per hour
Project Coordinator 1 $100.00 per hour
Senior Project Analyst $135.00 per hour
Project Analyst $110.00 per hour
Researcher $90.00 per hour
Project Support / Administrative
Professional Staff $85.00 per hour
Project Controller 2 $100.00 per hour
Project Controller 1 $75.00 per hour
Project Support Specialist $75.00 per hour
The above hourly rates are exclusive of local travel/mileage, photocopying, first class postage and overnight courier service. These expenses including out-of-pocket expenses such as pre-approved travel and lodging, outside exhibit preparation, requested overnight courier or registered and/or certified mail (return receipt requested) charges, and specialty reproduction (unless otherwise specified) are in addition to the contract amount and will be charged at cost plus ten percent (+10%) for administration, coordination, and handling. Subcontracted services, other than those listed above, will be invoiced at cost plus ten percent (+10%).

In the event Monument is required to perform any act in relation to litigation arising out of any project with the Client (for example, expert consulting, responding to a complaint, or proceeding with discovery and trial), such services are not part of this contract, nor are they part of our normal fees.

If required, these types of services will be invoiced at two times the regular hourly rates.

In the event this contract extends beyond the initial term of the PSA, the hourly rates and any remaining amount in the contract shall be adjusted upwardly by five percent (5%) per annum, compounded annually, on the anniversary date of this contract.

Written communication services in other languages would be an additional cost and would be billed separately based on quoted hourly rates by independent translation services. Verbal communication in Spanish, if necessary, will be included at no additional charge.

Monument will submit monthly invoices for the professional and trade services rendered based on the hourly rate schedule provided above. The client shall promptly pay the uncontested amount due within no more than thirty (30) days after receipt of invoice. Upon completion of services, the remaining unbilled amount of the project balance shall become immediately due and payable.

MIG Schedule of Fees/Hourly Rates 2024 through 2028

CLASSIFICATION FIVE YEAR

AVERAGE
Principal $250
Senior Project Manager $215
Project Manager $205
Deputy Project Manager $145
Landscape Architect $150
Irrigation Designer $180
Project Associate $140
Senior Project Accountant $190
Project Administrative Support $115

SCHEDULE OF HOURLY RATES
City of Pico Rivera
Proposal for On-Call Engineering Services 29
Schedule of Fees and General Terms
Personnel Charges - Professional Staff
Product Name Units Rate ($)
Project Engineer ‐ Laboratory HR $190.00
Administrative HR $70.00
Principal Engineer ‐ Office HR $220.00
Principal Engineer ‐ Field HR $220.00
Principal Engineer ‐ Consultation HR $220.00
Principal Engineer ‐ Job Conference HR $220.00
Principal Engineer ‐ Expert Witness HR $500.00
Project Engineer ‐ Consultation HR $190.00
Principal Engineer ‐ Court Appearance HR $600.00
Project Engineer ‐ Office HR $190.00
Project Engineer ‐ Field HR $190.00
Project Engineer ‐ Job Conference HR $190.00
Staff Engineer ‐ Office HR $145.00
Staff Engineer ‐ Field HR $145.00
Drafting HR $110.00
Project Manager ‐ Office HR $165.00
Principal Geologist ‐ Field HR $200.00
Project Manager ‐  Field HR $165.00
Project Manager ‐ Job Conference HR $165.00
Principal Geologist ‐ Office HR $200.00
Principal Geologist ‐ Consultation HR $200.00
Principal Geologist ‐ Job Conference HR $200.00
Principal Geologist ‐ Expert Witness HR $450.00
Principal Geologist ‐ Court Appearance HR $550.00
Project Geologist ‐ Office HR $180.00
Qualified SWPPP Developer QSD HR $160.00
Project Geologist ‐ Field HR $180.00
Project Geologist ‐ Consultation HR $180.00
Project Geologist ‐ Job Conference HR $180.00
Staff Geologist ‐ Office HR $145.00
Staff Geologist ‐ Field HR $145.00
Qualified SWPPP Practitioner QSP HR $150.00
Personnel Charges - Field Staff
Product Name Units Rate ($)
Soils Engineering Technician HR $130.00
Soils Technician Compaction Testing HR $130.00
Soils Technician Rough Grading HR $130.00
Soils Technician Retesting HR $130.00
Public Works Inspector HR $135.00
Public Works Technician HR $130.00
Public Works Inspector ‐ Asphalt Paving HR $130.00
Public Works Inspector ‐ Asphalt Plant HR $130.00
Public Works Inspector ‐ Concrete Paving HR $130.00
Public Works Inspector ‐ Concrete Plant HR $130.00
Public Works Technician ‐ Asphalt HR $130.00
Public Works Technician ‐ Concrete HR $130.00
Laboratory Technician ‐ Field Lab HR $120.00
Lead Roadway and Structures Inspector HR $140.00
Structures Inspector HR $140.00
Roadway Inspector HR $130.00
Civil Inspector HR $135.00
Building Inspector HR $140.00
Schedule of Fees and General Terms
ASTM D244 Emulsion Sieve Analysis EA $185.00
ASTM D3910 Wet Track Abrasion EA $285.00
AASHTO T324 Hamburg Wheel Tracking Test EA $1,100.00
AASHTO T283 Tensile Strength Ratio EA $1,200.00
AASHTO T275 Core Denisty Paraffin Coated EA $85.00
AASHTO T312/T275 LTMD Gyratory Compactor EA $480.00
AASHTO T308 Asphalt Content by Ignition EA $285.00
AASHTO T308A AC Correction Factor EA $550.00
AASHTO T209 Theoretical Maximum Density EA $295.00
AASHTO T324 Hamburg Wheel Tracking ‐ RHMA EA $1,100.00
AASHTO T283 Tensile Strength Ratio ‐ RHMA EA $1,200.00
AASHTO T312/T275 LTMD Gyratory Comp.‐ RHMA EA $480.00
Laboratory Tests - Aggregates
Product Name Units Rate ($)
ASTM C131 Abrasion, Los Angeles Rattler EA $375.00
ASTM C40 Organic Impurities in Fine Agg EA $135.00
ASTM C127 Specific Gravity, Coarse Agg EA $255.00
ASTM C128 Specific Gravity, Fine Agg EA $290.00
ASTM C1252 Angularity & Voids, Fine Agg EA $280.00
ASTM C566 Moisture Content by Drying EA $35.00
ASTM C117 Materials Finer than No. 200 EA $160.00
ASTM D2419 Sand Equivalent EA $180.00
ASTM C289 Alkali‐Silica Reactivity EA $950.00
ASTM D4791 Flat & Elongated Particles EA $395.00
ASTM D5821 Percent Fractured Particles EA $275.00
ASTM C123 Percent Lightweight Particles EA $295.00
ASTM C88 Soundness by Sodium Sulfate EA $635.00
ASTM C136 Sieve Analysis, Fine Agg EA $265.00
ASTM C136 Sieve Analysis, Combined Agg EA $290.00
ASTM C136 Sieve Analysis, Coarse Agg EA $255.00
ASTM C142 Clay Lumps & Friable Particles EA $260.00
ASTM C535, Abrasion Large Aggregate EA $465.00
AASHTO T304 Angularity & Voids in Fines EA $255.00
AASHTO T84 Specific Gravity, Fine Agg EA $280.00
AASHTO T85 Specific Gravity, Coarse Agg EA $255.00
AASHTO T27 Sieve Analysis, Combined Agg EA $290.00
AASHTO T96 Abrasion, Los Angeles Rattler EA $375.00
AASHTO T27 Sieve Analysis, Fine Agg EA $285.00
AASHTO T27 Sieve Analysis, Coarse Agg EA $255.00
AASHTO T335 Percent Fractured Particles EA $255.00
AASHTO T176 Sand Equivalent EA $180.00
Equipment Charges
Product Name Units Rate ($)
Portable Drilling Equipment HR $750.00
Mobile Laboratory Trailer Mobilization EA $1,500.00
Mobile Laboratory Trailer & Testing Equipment DAY $700.00 Stationary Laboratory Trailer & Testing Equipment MO $1,500.00 Mileage MILE Quote
Diamond Bit Core Rig and Generator DAY $750.00
Nuclear Density Test Gauge DAY $35.00
Hand Held Turbidity Meter DAY $50.00
Ultrasonic Test Unit and Consumables DAY $100.00
Magnetic Particle Test Unit DAY $100.00
Name on Org Chart Company Job Title Hourly Rate**
Monica Villalobos President | Principal $274.07
Jason Cheng Transportation Planner $92.52
Gema Martinez‐ Castillo Planner/Designer (If Needed) 82.01 **Hourly ratesreflect all costs for office overhead, including direct and indirect costs. The Schedule of Hourly Rates shall remain fixed for the term of the PSA.

Schedule of Fees and General Terms
Skidmore DAY $80.00
Schmidt Hammer DAY $100.00
Torque Wrench DAY $80.00
Proof Load Testing Equipment DAY $150.00
Drilling Equip Mobilization / De‐Mob EA $800.00
ASTM C1028 Coefficient of Friction DAY $800.00
Mini Environmental Quality Meter DAY $400.00
Inertial Profiler DAY $2,000.00
Materials / Supplies LS Quote
Holiday Tester DAY $250.00
VOC Meter DAY $200.00
Misc Permits LS Quote
Misc Fees HR Quote
Misc Subconsultant LS Quote
Set of Aerial Photographs EA Quote
Blueprinting EA Quote
Dutch Cone Penetrometer with Operator HR $875.00
Hollow Stem Auger Drill Rig w/ Operator HR $775.00
Portable Drilling Equipment w/ Operator HR $750.00
Bucket Auger Drill Rig with Operator HR $875.00
Air Rotary Drill Rig with Operator HR $900.00
Rotary Wash Drill Rig with Operator HR $950.00
Per Diem DAY $150.00
Schedule of Fees and General Terms

TERMS AND CONDITIONS

GENERAL CHARGES
RMA Group requirestwenty‐four (24) hour prior notification forscheduling inspectors and/or technicians.

Inspection chargesstart at the scheduled show up time at the job site.  All inspection hours will be billed in the following increments:

There will be a minimum two (2) hour charge for any RMA Group employee presence on site.

Any time less than four (4) hours of work will be billed as four (4) hours.

Four (4) to eight (8) hours will be billed as eight (8) hours.

When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due to project constraints, ½ hour will be charged at double time rates in addition to any applicable hours worked.

Rates are valid through June 30, 2024. Rates for personnel will increase by 5% per year on July 1st of each subsequent year.

Outside services will be billed at cost plus 15% unless billed directly to and paid for by Client.

Requests made by client for management attendance at meetings at the projectsite will be charged atstandard rate.

Administrative/clerical support will be charged at 3% of the monthly direct charges.

OVERTIME CHARGES
Work performed in excess of 8 hours per day and / or up to eight (8) hours on Saturdays will be billed at 1.50 timesthe unit rate.

Work performed on Sunday, recognized holidays, or in excess of eight (8) hours on Saturdays will be billed at 2.00 times the unit rate.

A 20% surcharge will be applied for laboratory tests performed on a Saturday or Sunday.

PER DIEM AND TRAVEL CHARGES
A $150.00 charge per day will be applied when our personnel are required to stay overnight at remote locations. Time will be billed at the unit rate while traveling to a remote location or if a location requires an overnight Mileage forstaytravel outside a 50 mile radius from either the projectsite or the nearest RMA facility whichever is closest, will be charged at a rate of $0.60 per mile.

NIGHT WORK
A $10.00 per hour surcharge will be added to all personnel rates for work performed during night shifts.

RMA Group is a multi dicipline firm with additional service sector rates that may not be inluded in the rates shown above . Full 8 page rates sheet available upon request

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND
YAO ENGINEERING, INC.

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and Yao Engineering, Inc., (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call engineering management services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : April 23, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 16
13p
Professional Services Agreement
YAO ENGINEERING, INC.

Page 2 of 14 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of Two Million Five Hundred Thousand Dollars ($2,500,000.00), unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement
YAO ENGINEERING, INC.

Page 3 of 14 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. Felix Yao, Principal, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 4 of 14 ends

12. INDEPENDENT CONTRACTOR

12.1 Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City.

12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.3 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

12.4 The Parties further acknowledges the following: (i) that Consultant shall provide the services outlined in the Scope of Services directly to City; (ii) Consultant maintains a business location at the address listed under Section 20 that is separate and distinct from the City; (iii) Consultant contracts with other businesses to provide the same or similar services and maintains a clientele without restriction from the City; (iv) Consultant advertises and holds itself out to the public as available to provide the same or similar services; (v) unless otherwise specified in this Agreement, Consultant provides its own tools, vehicles, and equipment necessary for performing the Scope of Services; (vi) Consultant has proposed and negotiated its own rates; and (vii) consistent with the nature and demands of the project and the City’s business hours, Consultant may set its own hours and location of work.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 5 of 14 ends

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives Professional Services Agreement
YAO ENGINEERING, INC.

Page 6 of 14 ends

its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 7 of 14 ends

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 8 of 14 ends

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 9 of 14 ends

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20.NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

Professional Services Agreement
YAO ENGINEERING, INC.

Page 10 of 14 ends

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Felix Yao, Principal
Yao Engineering, Inc.
60 N. Daisy Ave, Suite 2C
Pasadena, CA 91107
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt Professional Services Agreement
YAO ENGINEERING, INC.

Page 11 of 14 ends

to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 12 of 14 ends

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

Professional Services Agreement
YAO ENGINEERING, INC.

Page 13 of 14 ends

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This section intentionally left blank]
Professional Services Agreement
YAO ENGINEERING, INC.

Page 14 of 14 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”
CITY OF PICO RIVERA YAO ENGINEERING, INC.
______________________________ ___________________________________ Andrew C. Lara, Mayor Felix Yao, Principal
Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney

EXHIBIT A

SCOPE OF SERVICES
Yao Engineering, Inc. · 60 N. Daisy Ave. Unit 2C, Pasadena, CA. 91107 January 17, 2024
Mr. Noe Negrete
Director of Public Works
City of Pico Rivera
Request for Proposal (RFP) No. PR-RFP-037
Proposal for On-Call Engineering Services

Yao Engineering, Inc. (Yao Engineering) is pleased to submit our Statement of Qualifications (SOQ) to provide Professional Electrical, Instrumentation, and Controls Engineering and Mechanical, Plumbing, and Fire Protection Engineering Services.

Yao Engineering was incorporated in 2018 in the State of California and has a single office located in Pasadena.

Yao Engineering is a certified DBE, MBE, SBE, and 8(a) firm. Our key personnel have worked together for over 9 years dating back to when we worked together at CDM Smith.

Yao Engineering is currently one of Pico Rivera’s On-Call Engineers via the On-Call Engineering Services RFP issued in November 2019. Through this contracting vehicle, we have provided two (2) plan reviews for Pico Rivera: peer review of the PFAS Project that Jacobs is providing at the three (3) Water Plants and Well No.5 and peer review of the City Yard Generator. Additionally, we have designed four (4) additional projects under this same contract vehicle for Pico Rivera.

Yao Engineering’s FEIN is 82-4919022. All information within our proposal is true and correct. We acknowledge all addenda to this RFP. Our proposal is valid for 90 calendar days from the date of submittal.

If you have questions or need additional information, please feel free to contact Felix Yao. We look forward to continuing to work with the City of Pico Rivera to deliver each of the task orders from this on-call contract to meet the objectives of the scope, to stay within the budget, and to stay on schedule.

Very Truly Yours,

Felix Yao, P.E.

Principal
60 N Daisy Ave, Suite 2C, Pasadena, CA. 91107
(407) 493-4941
[email protected]
P a g e | 2
SECTION B. QUALIFICATIONS OF THE FIRM
Yao Engineering Profile
Yao Engineering, Inc. was founded in 2018 and specializes in providing Mechanical, Electrical, Instrumentation and Controls, Plumbing, and Fire Protection Engineering Services. Yao Engineering was incorporated in February 2018 in California and has a single headquarter office in Pasadena. Our Principal is located in our Pasadena office, while the remainder of the proposed staff are located in work-fromhome offices in Florida and Pennsylvania. Yao Engineering’s proposed staffing is shown in Section C.

Yao Engineering Financial Condition
Yao Engineering’s financial stability has continued to increase every year since our inception. Since our inception we have never applied for bankruptcy, have not had and do not currently have any pending litigation or outstanding claims, and have no plans to close offices or merge with another firm that will impede our ability to execute our services in accordance with this proposal.

Yao Engineering Past Experience
Felix, Mike, and Josh have been working together for 9+ years dating back to our time at CDM Smith, where Felix led the Southwest Electrical Group, Mike led the Southeast Electrical Group, and Josh led the Southeast Mechanical Group. Many times Felix was the peer review for Mike’s designs and vice versa, while Josh was on our multidisciplinary teams so there were numerous projects where we had to review each other’s designs during the interdisciplinary reviews. Below is a sample list of projects where Felix, Mike, and Josh worked together:

Client – Project Name
Roles and Responsibilities
Felix Mike Josh
LADWP – Arc Flash Projects Lead Electrical QA/QC Electrical N/A LADWP – Owens Lake Lead Electrical QA/QC Electrical Lead Mechanical Broward County – Lift Station QA/QC Electrical Lead Electrical Lead Mechanical PWP – Generator Tap Boxes Lead Electrical QA/QC Electrical N/A Pico Rivera – Water Plant No.3 Lead Electrical QA/QC Electrical N/A Pico Rivera – Well No.5 Lead Electrical QA/QC Electrical N/A SoCalGas – EV Charging Stations Lead Electrical QA/QC Electrical N/A Pasadena – Arroyo Seco Stormwater Capture Lead Electrical QA/QC Electrical N/A Paramount – Spane Park Stormwater Capture Lead Electrical QA/QC Electrical N/A Glendora – Finkbiner Park Stormwater Capture Lead Electrical QA/QC Electrical N/A LA – Puente Hills Landfill Lead Electrical QA/QC Electrical N/A San Jose Water – Williams PFAS Lead Electrical QA/QC Electrical N/A Lynwood – Lynwood Park Stormwater Capture Lead Electrical QA/QC Electrical N/A MWD – Security Upgrades Lead Electrical QA/QC Electrical N/A Mendocino – Critical Facilities Generators Lead Electrical QA/QC Electrical Lead Mechanical P a g e | 3
Yao Engineering Strength and Stability
Yao Engineering continues to grow quarter over quarter and year over year. We have worked exclusively for Municipalities and Public and Private Utility Agencies since our inception in 2018. We are either the prime consultant or the sub-consultant to these Agencies:

Yao Engineering is a sub-consultant to these major engineering firms supporting their major projects:

Yao Engineering has been awarded multi-year On-call Electrical Engineering prime contracts with:
- City of Pico Rivera
- Pasadena Water and Power
- City of Corona
- City of Montclair
- County of Santa Barbara
- City of Anaheim
- Three Valleys Metropolitan Water District
- Long Beach Utilities
- City of Azusa
- City of Chino
- South Coast Water District
In addition to our licensed Professional Engineers (PE’s): Felix, Mike, Josh, and Adam. We also have senior engineers, junior engineers, and CAD designers that are able to support projects on an as-needed basis.

Only the licensed PE’s are shown in this proposal to condense the proposal length.

Felix and Josh would be the primary engineers for their respective disciplines. Mike and Adam would primarily be responsible for independent QA/QC of deliverables. Our current workload provides the flexibility to meet any volume of work that could be produced under this contract.

Yao Engineering has completed every project to the satisfaction of the Client and have a proven track record of staying on schedule on 97% of our projects. For the projects that were not on schedule, it was due to circumstances outside of our control. Due to our successful history, our repeat Clients represent a vast majority of our current workload and backlog.

P a g e | 4
SECTION C. PROPOSED STAFFING
Table 1: Summary of Proposed Staffing
Name Role Degree License Years of Work Experience
Felix Yao Principal BSEE PE – Electrical 20
Mike Cahill Senior Electrical Engineer BSEE PE – Electrical 18 Josh Goenner Senior Electrical Engineer BSEE 22
Greg Ward Junior Electrical Engineer BSEE EIT – Electrical 9 Josh Meinig Senior Mechanical Engineer BSME PE – Mechanical 17 Adam Barney Senior Mechanical Engineer BSME PE – Mechanical 20 Simon Rojas Junior Mechanical Engineer BSME EIT – Mechanical 9 Zach Schlueb Junior Mechanical Engineer BSME EIT – Mechanical 5 Samuel King Junior Mechanical Engineer BSME 4
Felix Yao:

Felix graduated with a Bachelor of Science in Electrical Engineering (BSEE) from Kettering University and began his career at Jones Edmunds, where he designed facilities for NASA at Kennedy Space Center. Felix took the next step in his career at Tetra Tech and CDM Smith where he served local municipalities and the Federal government on international projects designing Electrical and Instrumentation (E&I) systems.

At Tetra Tech, Felix led the E&I Group responsible for all the projects in the Southeast US, while at CDM Smith, Felix led the Electrical Group responsible for all the projects in the Western US. At Tetra Tech and CDM Smith, Felix’s responsibilities included project management; leading the E&I designs; peer reviews and QA/QC of design deliverables; analysis, evaluation, and troubleshooting of issues within existing electrical systems and individual components; and construction inspections.

Mike Cahill:

Mike graduated with a BSEE from University of Central Florida. Upon graduation Mike began his career at CDM Smith, where he learned how to design electrical systems and provide engineering services during construction on municipal projects throughout the Southeast US. Mike’s reputation grew quickly and was assigned to projects throughout the US and internationally.

Before leaving CDM Smith Mike rose to become a Project Manager who led multi-discipline teams. At CDM Smith, Mike and Felix were selected for a program that included 2 members of each discipline to revamp the QA/QC procedure and training. We’ve adopted the same QA/QC procedures and protocols.

Josh Meinig:

Josh has more than 17 years of experience in the specialties of building mechanical systems for commercial, institutional, governmental and industrial projects. His specific design experience includes heating, ventilation, and air conditioning; plumbing; fire protection design; fueling system design; compressed air system design; chilled water design; boiler design; and construction administration for water and wastewater treatment plants and various other projects, including more than 25 pipeline projects and more than 100 pump station projects. He has extensive experience with codes and standards, including the Florida Building Code; International Building Code; American Society of Heating, P a g e | 5
Refrigerating, and Air Conditioning Engineers Standards, including 62 and 90.1; and National Fire Protection Association Standards, including 30, 37, 90A, 90B, and 820.

Adam Barney:

Adam has more than 20 years of professional experience in mechanical engineering. His specialization is in the commercial and industrial mechanical design of HVAC, plumbing, and mechanical systems. Adam strives to incorporate an efficient and effective approach to mechanical systems that are elegant and innovative to provide an aesthetic, cost effective, and practical solution. He has worked on projects for clients such as Walt Disney World, Homewood Suites and UPS. In addition, he has been involved in the design of mechanical systems for a variety of hotel, restaurant, residential / commercial buildings, and numerous aviation facilities. Adam graduated from the University of Central Florida with his B.S. in Mechanical Engineering.

Proposed Staff Availability:

Proposed staff shall be available for the duration of the contract, unless extreme situations dictate otherwise (e.g. termination of employment, death, extended medical leave, etc.). In the event a proposed staff becomes unavailable, this will be communicated with Pico Rivera immediately and the other discipline lead will assume the responsibilities.

Resumes of Project Team:

In order to reduce the length of our proposal, the only staff descriptions and resumes included are for our Licensed Professional Engineers in Appendix A.

SECTION D. CONSULTANTS AND/OR SUB-CONSULTANTS
Yao Engineering has the internal expertise to provide Mechanical, Electrical, Instrumentation and Control, Plumbing, and Fire Protection Engineering design and engineering services during construction.

SECTION E. WORK APPROACH:

A. Project Management: actively managing task orders as the City of Pico Rivera determines them.

Actively managing by staying in close communication – via in-person meetings, phone calls, site visits, etc. – to understand the City’s objectives and how to best include all key stakeholders to gain consensus and determine the best path forward. Every interaction between Yao Engineering and the City of Pico Rivera will be documented in meeting minutes or email to track decisions that were made at key junctures of each task order.

B. Community Outreach: provide assistance to the City of Pico Rivera and/or City Council related to Mechanical, Electrical, Instrumentation, Plumbing, and Fire Protection portions that are relevant at City Council and/or Community Outreach Meetings. Specific examples include creating Power Point presentations, conceptual plans and drawings, creating cost analysis spreadsheets, and technical memorandums.

C. Preliminary Engineering and Planning Studies:
a. Create preliminary studies for the parameters related to the Mechanical, Electrical, Instrumentation, Plumbing, and Fire Protection portion of task orders. b. Our typical studies include the following sub-sections:
i. Codes and Standards
ii. General Mechanical, Electrical, Instrumentation, Plumbing, and Fire Protection P a g e | 6
iii. Area Classifications
iv. HVAC
v. Conductors
vi. Conduit
vii. Motor Controllers
viii. Variable Frequency Drives
ix. Motor Control Centers
x. Lighting and Controls
xi. Panelboards
xii. Equipment Control
xiii. SCADA
xiv. Programmable Logic Controller (PLC)
xv. Grounding System
xvi. Plumbing Fixtures
xvii. Fire Protection
D. Surveys, Mapping, and Field Reviews: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary surveys in the Preliminary Engineering Studies.

E. Environmental Studies and Documentation: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary environmental documentation.

F. Utility Research and Coordination: coordinate with the City, other consultants, and/or Southern California Edison (SCE) to provide accurate locations of existing utilities, demolition plans, construction sequencing, proposed locations of new utility equipment, etc. for only the Electrical components of each task order. Research and coordination includes completing any documentation and paperwork from SCE (e.g. new service and/or change to existing service request form, including Customer/Project Information Sheet, Site/Plot, Load Schedules and Panel Drawings, Design Option Letter, EUSERC Drawings, and any native files SCE may request). Attend coordination meetings or any meetings on-site to assist with understanding the impact of the electrical service changes as it relates to the task order. Yao Engineering is not capable of selfperforming potholing, but would be willing to work with the City’s preferred Consultant to include any necessary potholing information.

G. Right of Way Phase & Determination: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary right of way phase & determination.

H. Design – Mechanical, Electrical, Instrumentation, Plumbing, and Fire Protection Aspects Only:
a. Create plans, specifications, and cost estimates per the City’s, Public Works, and Caltrans Standards based on preliminary budgetary constraints.
b. Design deliverables will include 60%, 90%, and Final Contract Drawings. c. Reviews of the 60% and 90% deliverables will be held with the City and any key stakeholders the City deems necessary in order to discuss specific design components of the task order.
d. Plans will be created in AutoCAD per the City’s standard format and plot styles. Native AutoCAD files (.dwg) will be provided with each submittal to the City’s Project Manager.

Each DWG file will be e-transmitted so all necessary x-refs, plot settings, and pen tables will be included.

P a g e | 7
e. Technical Special Provisions will be provided per the City’s requirements and Greenbook format, the latest edition.
f. Cost estimates will be created per RS Means, the latest edition. g. Native files will be made available to the City at any given time during the duration of the contract.

I. Construction Phase Authorization: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary construction phase authorization.

J. Bid Support Services: provide PDF and native copies of the Final Deliverables (e.g. DWG, DOC, XLS, etc.) to the City to assist with bidding purposes. Respond to bidder questions during the bid phase and prepare addendums as necessary.

K. Construction Support Services: provide engineering services during construction:
a. Attend pre-construction meeting
b. Review and respond to RFIs
c. Provide submittal list
d. Review and approve submittals/shop drawings
e. Attend construction progress meetings
f. Corrections and change orders related to errors and omissions shall be provided with no cost impact to the City
g. Collaborate with the City to resolve discrepancies in the contract documents h. Document deviations, defects, and/or deficiencies by the construction contractor during site visits
i. Create as-built plans based on the construction contractor’s redlines and provide native files to the City
L. Grant Administration: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary grant administration.

M. Prior Rights Expertise: Yao Engineering is not capable of self-performing this aspect of the RFP, but would be willing to work with the City’s preferred Consultant to include any necessary prior rights expertise.

P a g e | 8
SECTION F. CLIENT REFERENCES:

YAO ENGINEERING RECENT PROJECTS:

Client – Project Name
Summary of Work
Status Project
Duration
Reference Contact Information
LADWP – Numerous Owens Lake Projects.
4800V electrical distribution and fiber optic and
telemetry upgrades; SCADA system training; and
construction support services (e.g. inspections, shop
drawings, and as-builts); drone surveying; etc.

On-going 2018 –
Present
David Ebersold
Vice President
(213) 457-2139
[email protected]
Pasadena Water & Power (PWP) – Arc Flash Studies.

Providing arc flash studies and labels at 25 booster
station and well facilities throughout the water
department.

Completed Apr 2020 –
Aug 2021
Norman Lara
Water Operations Supervisor
(626) 744-7607
[email protected]
PWP – Generator Tap Boxes.

Modify electrical system to add a Manual Transfer
Switch with Camlocks to provide connections for a
portable generator at 9 booster stations.

Completed Apr 2021 –
Nov 2022
Michele Carina
Principal Engineer
(626) 744-7012
[email protected]
Southern California Gas (SoCalGas) – EV Chargers.

Design of 95 dual Level 2 and Level 3 EV Chargers at
five (5) SoCalGas bases.

Completed Dec 2021 –
Nov 2022
Greg Kelley
Vice President
(562) 944-3408
[email protected]
City of Paramount – Spane Park Stormwater Capture.

The design includes installing a stormwater retention
basin, pump station, and treatment below the park
90% Feb 2022 –
Present
Oliver Galang
Principal
(213) 598-4178
[email protected] City of Pasadena – Arroyo Seco Stormwater Basin. The design includes installing a diversion structure,
actuated valve, pre-treatment, and filtration unit
90% Mar 2022 –
Present
City of Glendora – Finkbiner Park Stormwater Capture.

The design includes installing a stormwater retention
basin, pump station, and treatment unit below the
park’s soccer field and baseball fields
60% Jan 2023 –
Present
Metropolitan Water District – Security Upgrades.

Upgrading existing cameras, add new cameras, replace
card readers, add PA and intercom systems
Final
Design
Feb 2023 –
Present
Keenan Bull
Senior Project Manager
(949) 930-7258
[email protected]
P a g e | 9
SECTION H. SCHEDULE OF HOURLY RATES:

December 2024-2028 Labor Rates
Title Hourly Rate
Principal Electrical Engineer $225
Senior Electrical Engineer $215
Principal Mechanical Engineer $225
Senior Mechanical Engineer $215
Administrative $115
A. All Other Direct Costs (ODCs) and mileage shall be confirmed with Pico Rivera prior to purchase or expenditure.

B. Other Direct Costs shall be reimbursed AT COST + 10%. Receipts shall be provided with the invoice.

C. Mileage reimbursement rates shall abide by the current IRS Mileage Reimbursement Rate which the mileage is incurred.

D. Labor rates shown above are valid for up to 5 years (February 14, 2028) from the submittal due date (February 14, 2024).
36 APPENDIX C
NON‐COLLUSION AFFIDAVIT
The undersigned declares states and certifies that:

1. This Proposal is not made in the interest of, or on behalf of any undisclosed person, partnership, company, association, organization or corporation. This Proposal is genuine and not collusive or sham.

2. I have not directly or indirectly induced or solicited any other Proposer to put in a false or sham proposal and I have not directly or indirectly colluded, conspired, connived, or agreed with any other Proposer or anyone else to put in sham proposal or to refrain from submitting to this RFP.

3. I have not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price or to fix any overhead, profit or cost element of the proposal price or to secure any advantage against the City of Pico Rivera or of anyone interested in the proposed contract.

4. All statements contained in the Proposal and related documents are true.

5. I have not directly or indirectly submitted the proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay any fee to any person, corporation, partnership, company, association, organization, RFP depository, or to any member or agent thereof to effectuate a collusive or sham proposal.

6. I have not entered into any arrangement or agreement with any City of Pico Rivera public officer in connection with this proposal.

7. I understand collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards.

Signature of Authorized Representative
Name of Authorized Representative Title of Authorized Representative

Mr. Yao is an electrical engineer with 20 years of experience in consulting engineering and management. He has designed electrical systems for water and wastewater facilities, industrial facilities, architectural facilities, commercial facilities, and federal facilities. He has provided technical leadership, quality control, and design and construction services.

Mr. Yao has power system experience which includes transmission voltages up to 115kV and distribution voltages up to 69kV; prime, standby, and emergency generators; switchgear; switchboards; motor control centers; variable frequency drives; uninterruptible power supplies; lighting; lighting control; fire alarm; telecommunications; security and access control; lightning protection; paging and area warning systems; and microgrids (solar and wind).

Mr. Yao has SCADA systems experience which includes both ring and star topology system architectures, programmable logic controllers (PLC), remote I/O (RIO), and human machine interfaces (HMI). He has experience with major PLC manufacturers such as Allen-Bradley, Square D (Schneider Electric), and Siemens.

Mr. Yao has performed electrical and automation inspections, including underground raceways and ductbanks, grounding, factory inspections, on-site storage, mounting, terminations, substantial completion, final completion, etc.

MUNICIPAL/INDUSTRIAL FACILITIES
Owens Lake Electrical and Instrumentation Training, Los Angeles Department of Water and Power (LADWP), Los Angeles, California. Mr. Yao served as the principal engineer for specific electrical and instrumentation training topics held by LADWP for their engineering staff.

Owens Lake Asset Condition Assessment, Los Angeles Department of Water and Power (LADWP), Los Angeles, California. Mr. Yao served as the electrical and instrumentation subject matter expert for a condition assessment program for the electrical and instrumentation assets on Owens Lake.

Pasadena Water and Power (Water) Arc Flash Studies – Pasadena, CA. Mr. Yao served as the principal engineer for arc flash studies at 25 booster and/or well stations throughout PWP’s distribution system.

City of Pico Rivera Well No.5 Electrical Upgrades – Pico Rivera, CA. Mr. Yao served as the principal engineer for the design of the replacement of the existing electrical and instrumentation system. The design includes a 480V switchboard, MCC, VFD, grounding, lighting, and control panel that communicates via spread spectrum radio.

Pasadena Water and Power (Water) Generator Tap Boxes – Pasadena, CA. Mr.

Yao served as the principal electrical engineer for the design of the addition of a Manual Transfer Switch (MTS) and Cam-lock Cabinet at nine booster stations. The design includes modifying the incoming service or the existing switchboard to accommodate the addition of the MTS. Coordination with PWP’s Power group was necessary to understand their requirements as it relates to modifying the incoming services.

Registration
Professional Engineer:

California #20976
Florida #69636
Nevada #24103
Washington #53989
NCEES Record #45739
Education
B.S. – Electrical Engineering,
Kettering University, 2003
Felix Yao, P.E.

Principal

FELIX W. YAO, P.E.

City of Pico Rivera Water Plant No.3 Electrical Upgrades – Pico Rivera, CA. Mr. Yao served as the principal engineer for the design of the replacement of the existing electrical and instrumentation system. The design includes a 480V switchboard, MCC, VFDs, grounding, lighting, and control panel that communicates via spread spectrum radio.

Santa Anita Racetrack Duplex Pump Stations – Arcadia, CA. Mr. Yao served as the principal electrical and instrumentation engineer for the design of four duplex pump stations. The design includes a master control panel and four individual 240V control panel and grounding that communicates via spread spectrum radios to a master control panel.

Colorado River Pumping Plants Sump Rehabilitation, The Metropolitan Water District of Southern California (MWD), Los Angeles, California. Mr. Yao served as the principal electrical engineer responsible for QA/QC to support the contractor. Additional responsibilities include designing the electrical system and control panels for the temporary bypass pumping systems at each of the five pumping plants that communicates via spread spectrum radios.

City of Manteca Duplex Pump Station – Manteca, CA. Mr. Yao served as the principal electrical and instrumentation engineer for the design of a duplex pump station. The design includes a 240V control panel, grounding, and communication via spread spectrum radio.

City of Scottsdale Thomas Groundwater Treatment Facility – Scottsdale, AZ Mr. Yao served as the senior electrical and instrumentation QA/QC engineer for the design of a water treatment facility whose electrical system was being upgraded. The design includes 12.47kV switches, 12.47kV ATS, 480V switchboard, MCC, VFDs, active harmonic filter, lighting, grounding, traveling bridge crane, main control panel, local control panels, and numerous Emerson PLCs.

City of Scottsdale Shea Water Treatment Plant – Scottsdale, AZ Mr. Yao served as the senior electrical and instrumentation engineer for the design of a water treatment facility chemical feed systems whose electrical system was being replaced. The design includes 480V switchboard, MCC, VFDs, lighting, grounding, and local control panels communicating on the existing star network.

South Haiwee Reservoir Water Treatment Facility, Los Angeles Department of Water and Power (LADWP), Los Angeles, California. Mr. Yao served as project engineer for the electrical and instrumentation design of a water treatment facility. The design includes a 240V power distribution system, lighting, grounding, multiple control panels, control strategies, short circuit analysis, coordination study, arc flash analysis, and arc flash labels.

Bay Delta Habitat & Conservation & Conveyance Program, The Metropolitan Water District of Southern California (MWD), Los Angeles, California. Mr. Yao served as electrical engineer during the conceptual phase of the Bay Delta project. The conceptual design includes 115kV substation, 15kV switchgear, 480V switchgear and motor control centers (MCCs), 15kV variable frequency drives (VFDs), and emergency standby generators.

Owens Lake Ph.7A and Ph.9/10, Los Angeles Department of Water and Power (LADWP), Los Angeles, California. Mr. Yao served as project engineer during construction for Phases 7a and 9/10.

The construction includes 4.8kV power distribution, 480V power distribution, grounding, remote telemetry, and a fully automated SCADA system.

Mr. Cahill has over 18 years of experience in power distribution design and construction services for environmental, industrial, and commercial facilities. He provides all aspects of power distribution design and construction service including medium and low voltage distribution design, electrical master planning, short circuit and protective device coordination studies, arc flash hazard evaluations and mitigation, LEED® building certification and design services, and construction services. His experience includes water and wastewater treatment plants, solid waste facilities, water and wastewater pumping stations, industrial and chemical facilities, commercial buildings, and facilities design.

MUNICIPAL/INDUSTRIAL FACILITIES
Electrical Engineer of Record, Monterey WRF Centrifuge Replacement, JEA, FL Mr.

Cahill is the Electrical Engineer of Record for the Monterey WRF Centrifuge Replacement project. The project includes a new centrifuge, control panels, polymer system and control panels, motor control section with variable frequency drive, and integration to JEA’s existing SCADA system.

Electrical Engineer of Record, Ocmulgee WPCP Electrical Upgrade, City of Warner Robins, GA
Mr. Cahill was the Electrical Engineer of Record for the Warner Robins Ocmulgee WPCP Electrical Upgrade. The project included removal and replacement of all existing 208 volt electrical equipment with new 480 volt, 1200 amp automatic transfer switch, 400kW standby generator, motor control centers, and provisions for future PLC equipment. Project includes refeeding all existing equipment and upgrading motors for operation on 480 volt service. Also includes removal and replacement of interior lighting with LED lighting.

Electrical Engineer of Record, Buffalo Ave Class III/IV Pump Station Rehabilitation Project, JEA, Florida.

Mr. Cahill was the Electrical Engineer of Record for the rehabilitation/improvements for the JEA Buffalo Avenue Pump Station. The project includes a complete rehabilitation of the existing lift station including land acquisition for a new MCC building and generator. Design included 480V new motor control center, 400kW generator, variable frequency drives, new PLC system, security system, and ancillary equipment. Mr. Cahill worked closely with JEA staff to ensure compliance with JEA Wastewater Pump Station and Facilities standards. The project also included maintenance of plant operations plans to incorporate a bypass pumping and an emergency bypass pumping system with diesel pumps.

Electrical Engineer of Record, Anastasia Island Wastewater Treatment UV Improvements, St. Johns County, Florida.

Mr. Cahill provided electrical design services for the improvements to the Anastasia Island WWTF UV Improvements which includes new 480 volt distribution equipment, integration to the existing PLC system, extensive maintenance of plant operations plan during construction, integration with the existing PLC system, and coordination with the concurrent reuse system improvements project.

Electrical Engineer, Kingsport Wastewater Treatment Plant (WWTP) – 5kV Switchgear Replacement, Kingsport, Tennessee.

Mr. Cahill provided electrical design services to replace the service entrance 4160-volt switchgear and a downstream 480-volt switchgear. The project consisted of removal of the 4160-volt switchgear and installation of a new 4160-volt switchgear in an outdoor power house enclosure. A detailed sequence of construction was developed in order to maintain plant operations while the new 4160-volt switchgear was connected to the existing 4160- volt loops.

Electrical Engineer, Progressive Design-Build for WWTP Improvements, City of Kingsport, Tennessee.

The City of Kingsport 12.5-mgd (with a peak flow of 35 mgd) WWTP improvements $23.4M award-winning project included the influent pump station, yard piping and flow splitting devices for several unit processes, conversion of the plant aeration process, addition of a Registration
Professional Engineer:

Florida #70837
Tennessee #115297
Georgia #044736
Leadership in Energy and
Environmental Design
Accredited Professional:

LEED AP GBCI #10225518
Education
B.S. – Electrical Engineering,
University of Central Florida,
2005
Mike Cahill, P.E.

Electrical Engineer

MIKE CAHILL
fourth clarifier, improvements to the sludge pumping system, and additional sludge digestion capacity. Mr.

Cahill was responsible for the electrical design which included modifications to the 480-volt distribution system to add two UV modules to the process train. This project was awarded the 2010 American Council Engineering Companies (ACEC) of Tennessee’s Grand Award for Special Projects for the evaluation, design, and construction management at risk (CMAR) implementation of the WWTP upgrades.

Electrical Engineer, Kingsport WWTP – Electrical Evaluation & Master Plan, City of Kingsport, Tennessee.

Mr. Cahill provided an electrical evaluation of the City of Kingsport’s 4160 volt and 480-volt distribution system.

The state of condition of all equipment, utility service, utility metering data, existing arc flash evaluations, and generated equipment load data sheets was evaluated and a recommended master plan for equipment replacement based on the findings was provided.

Electrical Engineer, JEA Mandarin Water Reclamation Facility UV Improvements, JEA, Florida.

Mr. Cahill provided the electrical design and construction services. Equipment consisted of a new building, 480- volt distribution switchboard, and capabilities for adding redundancy to the reuse and UV system in the future.

Electrical Engineer, Design-Build-Operate (DBO) Regional Surface WTP 72 – 120 mgd Expansion, Tampa Bay Water, Tampa, Florida.

Mr. Cahill provided electrical design and construction services for the plant expansion. Mr. Cahill was responsible for the electrical design, which included 15kv distribution (13,200 Volts), paralleling generator switchgear with 2-1250kw diesel engine drive generators and space for a future unit as part of a significant $120M design-build expansion of the surface WTP from 72 mgd to 120 mgd capacity. He also participated in the original plant design, and served as the electrical project engineer. The expansion included two new 33 mgd ACTIFLO™ units, two new 33 mgd ozone contact chambers, a new 2,000 ppd ozone generation system with LOX feed gas, additional filters to accommodate an additional 48 mgd of net filtered water, chemical feed and storage facility expansion, and expansion of the residuals handling system.

Electrical Engineer, Design-Build of David L. Tippin Water Treatment Facility Improvements, Tampa, Florida.

This $2.86 million project included the design, permitting, and construction of high service pumps at the 156 mgd David L. Tippin Water Treatment Facility. Mr. Cahill provided electrical design and construction services for this design-build project. This first phase of the project involved evaluating options to address aging pumping station infrastructure and better utilize the existing clearwell storage. The second phase included removing and replacing three medium voltage high service pump variable frequency drives with new 4160-volt (V) variable frequency drives. The project also consisted of rewinding two 2300V, 1000-hp motors to operate on a 4160V power supply. Critical to the project success was the need to maintain operation of existing pumps during the installation of the new equipment.

Electrical Engineer, Naval Submarine Base Kings Bay, NAVFAC Southeast, Kings Bay, Georgia.

Mr. Cahill was tasked with providing a comprehensive power system analysis of the entire Naval Submarine Base Kings Bay electrical utility, and electrical assessment of all equipment within the base master plan. Mr.

Cahill was also tasked with providing a master plan for replacement of aging infrastructure and arc flash hazard mitigation recommendations. The scope of the facility included two 230kV metering stations, three 230kV substations, various 4160-volt distribution switchgear.

Electrical Engineer, Power System Analysis and Training, Los Angeles Department of Water & Power, Los Angeles, California.

Mr. Cahill was responsible for performing power system analyses on six existing pump station facilities. His duties included reviewing field collected data against the electrical system models in SKM, and performing the short circuit analysis, developing time current characteristic (TCC) curves, and performing arc flash analysis.

Mr. Cahill was also responsible for assisting in the development of training and instructing client on site specific power system analysis, hazards associated with performing energized electrical work, NFPA-70E, and selection and use of personal protection equipment (PPE).

Mr. Meinig has more than 17 years of experience in the specialties of building mechanical systems for commercial, institutional, governmental and industrial projects.

His specific design experience includes heating, ventilation, and air conditioning (HVAC); plumbing; fire protection design; fueling system design; compressed air system design; chilled water design; boiler design; and construction administration for water and wastewater treatment plants and various other projects, including more than 25 pipeline projects and more than 100 pump station projects. He has extensive experience with numerous codes and standards, including the Florida Building Code; International Building Code; American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) Standards, including 62 and 90.1; and National Fire Protection Association (NFPA) Standards, including NFPA 30, 37, 90A, 90B, and 820.

MUNICIPAL/INDUSTRIAL FACILITIES
Mechanical Engineer, Golden Rod Storage Facility, Orange Co. Florida, 2022.

Mr. Meinig oversaw the mechanical design of a 4-story storage facility for the commercial market.

Mechanical Engineer, Great Hearts Charted School, Jacksonville, Florida, 2022 Mr. Meinig oversaw the mechanical design of a 2-story 60,000 sq. ft chart school.

Design included 250 tons of cooling equipment and full kitchen design. Design included full BMS system with VAVs and energy recovery.

Mechanical Engineer-of-Record, 118th St and Wilson Ave Pump Stations, JEA, Jacksonville, Florida, 2018.

Mr. Meinig provided design, permitting, bidding, and engineering services during construction for the rehabilitation of the pump stations. The building mechanical design included, general ventilation systems for the NFPA 820 high service pump room, high density electrical room cooling systems, HVAC and plumbing systems for office space, emergency plumbing fixtures for the chemical canopy, 4,000-gallon diesel fueling system for the emergency generator, and fire protection systems for the high service pump station.

Mechanical Engineer-of-Record, Fleming Island Regional WWTF BTU No. 3 Expansion, Clay County, Florida, 2020.

Mr. Meinig oversaw the all the building mechanical aspects of the project, including HVAC, and fueling systems. The design included renovations to the existing electrical room and relocation of the existing diesel fuel tank for the new emergency generator. The building mechanical design included, high density cooling systems for the electrical room and modifications to the diesel fueling system.

Mechanical Engineer-of-Record, Rivertown WTP Project, JEA, Jacksonville, Florida, 2021.

Mr. Meinig provided the design and permitting services for the Rivertown Water Treatment Plant Project. The Water Plant building mechanical design included, sodium hypochlorite ventilation systems including 100% outside air unit and emergency ventilation, general ventilation systems, control room HVAC system, high density electrical room cooling systems, emergency shower/eyewash plumbing fixtures, and fire protection systems.

Mechanical Engineer-of-Record, Greenland Water Treatment Plant Expansion From

6.0 to 9.0 MGD, JEA, Jacksonville, Florida, 2021.

Mr. Meinig provided fuel system design, permitting, bidding, and engineering services during construction. The design included a 5,000 gallon diesel storage tank Mechanical Engineer-of-Record, West Nassau Regional WTP (WNRWTP) Expansion Phase 1B, JEA, Jacksonville, Florida, 2018.

Mr. Meinig provided design, permitting, bidding, and engineering services during construction for the 3.6 mgd AADF WNRWTP Expansion. Part 2 included preliminary and Registration
Professional Engineer:

Florida
North Carolina
Alabama
Kentucky
South Carolina
Tennessee
Georgia
Louisiana
Member of American Society of
Heating, Refrigerating, and Air
Conditioning Engineers
Education
B.S. – Mechanical Engineering,
University of Central Florida,
2005
Josh Meinig, P.E.

Mechanical Engineer

JOSH MEINIG
final design, permitting, and engineering services during construction for the expansion of the WTP components, including a 0.75-MG new pre-stressed GST, well pump and header, sodium hypochlorite disinfection system, four high service pumps equipped with variable frequency drives (VFD), emergency diesel engine driven generator with a 4,000 gallon above ground fuel tank, pre-engineered metal building, supervisory control and data acquisition (SCADA) instrumentation, and large diameter raw water pipeline. The building mechanical design included, general ventilation systems for the high service pump room, high density electrical room cooling systems, HVAC and plumbing systems for office space, emergency plumbing fixtures for the chemical canopy, 4,000-gallon diesel fueling system for the emergency generator, and fire protection systems for the high service pump station.

Mechanical Engineer-of-Record, North 2 Utility Extension Project (UEP), City of Cape Coral, Florida, 2016.

The North 2 UEP area consists of adding potable water, wastewater, and irrigation services to an approximately

6.2 square miles residential area. Mr. Meinig oversaw the all the building mechanical aspects of the project; including HVAC, plumbing, and fire protection. The design included 2 canal pump stations, and 2 master pump stations. The canal pump stations building mechanical design included, hypochlorite ventilation system, general ventilation systems, high density cooling systems, emergency plumbing fixtures, diesel fueling systems, and fire protection systems. The master pump stations building mechanical design included, general ventilation systems, high density cooling systems, emergency plumbing fixtures, and diesel fueling systems.

Mechanical Engineer-of-Record. Lake Eve Pump Station Rehabilitation and Construction Services, Orange County, Florida, 2017.

Mr. Meinig was retained by Orange County Utilities to rehabilitate the County’s existing 13-million gallons per day submersible pump station located in Orlando, FL. Due to aging equipment and infrastructure, the Lake Eve Pump Station required rehabilitation or replacement. The design consisted of the analysis of two alternatives:
utilize the existing wetwell in tandem with a new wetwell or completely abandon the existing wetwell and install a new submersible pump station on the same site. It was recommended installing a new 26 million gallons per day submersible pump station due to comparable construction costs between the two alternatives, available space to construct the new wetwell on the parcel, and constructing a submersible pump station that is consistent with Orange County Utilities design standards. Mr. Meinig was the mechanical Engineer-of-Record for this project.

Mechanical Engineer, Rehabilitation and Replacement Project, Shady Hills WWTP, Pasco County, FL.

Mr. Meinig was the mechanical engineer for the improvements at the Shady Hills WWTP. The improvements include a new, 17-mgd internal recycle pump station and piping, effluent flow metering, headworks odor control, improved process control for the activated sludge process, and new storage and mixing systems for the Grease/Septage Receiving Facility.

Mechanical Engineer, South and Central AWWTF Support Services, City of Fort Myers, FL.

Mr. Meinig provided support services to address regulatory and process issues at the City’s two AWWTFs, including participating in capital budgeting; reviewing, analyzing, and commenting on laboratory results and regulatory data; participating in plant visits and walkthroughs; troubleshooting various process issues; and assisting with revisions to the implementation schedule of FDEP operating permits. Josh provides mechanical engineering services under this contract
Mechanical Engineer, Energy Efficiency and Conservation Block Grant Program Police Department Chiller Replacement, City of Fort Myers, Florida, 2014.

Mr. Meinig was a mechanical engineer for the design of the chiller replacement for the City of Fort Myers Police Department as part of the Department of Energy American recovery and Reinvestment Act. The project included replacement of two smaller chillers (30-ton and 95-ton) with a single high efficiency chiller (120 tons), pumps, valving, and controls. The existing air handling units were utilized in the design, but all new controls were provided to integrate the new chilled water system and the existing air handling units. This project was part of the comprehensive energy efficiency strategy with focus on cost savings and greenhouse gas reduction.

The estimated annual energy savings was over $18,000 with a reduction of 100.2 tons of greenhouse gases.

Adam has more than 18 years of professional experience in mechanical engineering. His specialization is in the commercial and industrial mechanical design of HVAC, plumbing, and mechanical systems. Adam strives to incorporate an efficient and effective approach to mechanical systems that are elegant and innovative to provide an aesthetic, cost effective, and practical solution. He has worked on projects for clients such as Walt Disney World, Homewood Suites and UPS. In addition, he has been involved in the design of mechanical systems for a variety of hotel, restaurant, residential / commercial buildings, and numerous aviation facilities. Adam graduated from the University of Central Florida with his B.S. in Mechanical Engineering.

Mechanical Engineer, Brownwood Senior Apartments, The Villages, Florida.

Provide mechanical, electrical, plumbing and fire protection performance specification design for the construction of the new senior apartment project. - 3 Building Types
- 265 Units
- 3 Basic Unit Types & ADA Versions
- 9,000 SF Clubhouse
Mechanical Engineer, Avalon Apartments, Spring, Texas
Provide the reuse of existing mechanical, electrical, plumbing and fire protection construction documents for the new construction.
- 3 Building Types (2 or 3 Story’s)
- 5 Basic Unit Types (368 Units Total)
- 3 Additional Unit Types for Solariums
- Free Standing Clubhouse
- Free Standing Fitness Building
- Free Standing Leasing Building
- Trash Compactor
Mechanical Engineer, Summerbay Apartments, Clermont, Florida.

Provide mechanical, electrical, plumbing and fire protection construction documents for the new construction.
- 2 Building Types (4 Story Wood Frame)
- 5 Basic Unit Types (270 Units Total)
- 3 Additional Unit Types for Solariums
- 5,500 SF Clubhouse (Leasing / Fitness)
- 1,000 SF Maintenance Building
- Trash Compactor
Mechanical Engineer, Tru Hotel by Hilton, Orlando, Florida.

Provide mechanical, electrical, plumbing and fire protection design for the common area spaces, pool area, internal corridors, and guestrooms. 120 Guestrooms, 6 Stories Mechanical Engineer, Hyatt Place Hotel, Palm Bay, Florida.

Provide mechanical, electrical, plumbing and fire protection design for the common area spaces, pool area, internal
corridors, and guestrooms.
- 106 Guestrooms, 5 Stories, +/- 63,000 SF
Mechanical Engineer, Gardens of Venice ALF, Venice, Florida.

Provide mechanical, electrical, plumbing and fire protection design for the construction of a new assisted living facility.
- 1 New 3-Story Building
- 5 Unit Types
- 3 Alternate Unit Types for ADA
Registration
Professional Engineer:

Alabama
Arkansas
Arizona
Colorado
Connecticut
Florida
Georgia
Illinois
Indiana
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Mississippi
Missouri
Nevada
New Mexico
New York
North Carolina
Ohio
Oklahoma
Pennsylvania
Rhode Island
South Carolina
Tennessee
Texas
Virginia
Washington DC
Education
B.S. – Mechanical Engineering,
University of Central Florida,
2005
Adam Barney, P.E.

Mechanical Engineer

ADAM BARNEY
Mechanical Engineer, Savannah ALF, Savannah, Georgia.

Provide mechanical, electrical, plumbing and fire protection design for a new assisted living facility.

Mechanical Engineer, Morimoto Restaurant, Disney Springs, Florida.

Provide mechanical and plumbing engineering design services for the construction of the new Morimoto restaurant, located at Walt Disney World’s Disney Springs.

Mechanical Engineer, Paddlefish Restaurant, Disney Springs, Florida.

Provide mechanical and plumbing engineering design services for the renovation of an existing building into the new Paddlefish Restaurant, located at Walt Disney World’s Disney Springs.

Mechanical Engineer, IAAPA Office Renovation, Orlando, Florida.

Provide mechanical, electrical, and plumbing engineering design for the renovation of an existing 16,980 SF space into a new IAAPA Office.

Mechanical Engineer, Orange Theory Corporate Office, Boca Raton, Florida.

Provide mechanical, electrical, and plumbing engineering design services for the build-out of a new Orange Theory Fitness Technology Lab Building with int the existing corporate office complex.

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)
P a g e | 9
SECTION H. SCHEDULE OF HOURLY RATES:

December 2024-2028 Labor Rates
Title Hourly Rate
Principal Electrical Engineer $225
Senior Electrical Engineer $215
Principal Mechanical Engineer $225
Senior Mechanical Engineer $215
Administrative $115
A. All Other Direct Costs (ODCs) and mileage shall be confirmed with Pico Rivera prior to purchase or expenditure.

B. Other Direct Costs shall be reimbursed AT COST + 10%. Receipts shall be provided with the invoice.

C. Mileage reimbursement rates shall abide by the current IRS Mileage Reimbursement Rate which the mileage is incurred.

D. Labor rates shown above are valid for up to 5 years (February 14, 2028) from the submittal due date (February 14, 2024).

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

To: Mayor and City Council
From: City Manager
Meeting Date: April 23, 2024
Subject: LANDSCAPE MAINTENANCE SERVICES – REJECT ALL
BIDS
Recommendation:

1. Reject all bids for the landscape maintenance services.

Fiscal Impact:

There is no fiscal impact to the General Fund due to this action.

Discussion:

The Public Works Department, Field Operations Division, is responsible for landscape maintenance services for all parks, public facilities, parkways, parkettes, and raised center median islands. Landscape maintenance services consist of but are not limited to, pruning and trimming shrubs and ground cover plants, controlling weeds, mowing and edge turf grass, removing leaves, trash, and debris, inspecting, maintaining, and repairing all irrigation systems.

On October 23, 2023, a Request for Bids (RFB) was advertised on the Planet Bids platform for landscape maintenance services. A total of eight (8) proposals were received by the bid closing date on November 29, 2023.

The following table summarizes the bids received:

Contractor Total Bid (2-years)
BrightView Landscape Services, Inc. $696,471.36
Mariposa Landscape, Inc. $719,112.24
DMS Facilities Services, Inc. $768,960.00
Greentech Landscape, Inc. $833,880.00
CG Landscape, Inc. $899,614.80
Parkwood Landscape Maintenance, Inc. $930,648.00
North Star Land Care $1,123,209.60
SGD Enterprises $1,254,360.00
14 CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024 LANDSCAPE MAINTENANCE SERVICES – REJECT ALL BIDS

Page 2 of 2 ends