8. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Southstar Engineering and Consulting, Inc. to provide on-call engineering services;

9. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Mark Thomas & Company, Inc. to provide on-call engineering services;

10.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to NV5, Inc. to provide on-call engineering services;

11.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to NCM Engineering Corp. to provide on-call engineering services;

12.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to AKM Consulting Engineers to provide on-call engineering services;

13.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Onward Engineering to provide on-call engineering services;

14.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Alta Planning & Design, Inc. to provide on-call engineering services;

15.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to BKF Engineers to provide on-call engineering services;

16.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Yao Engineering Inc. to provide on-call engineering services; and

17. Authorize the City Manager to execute the agreements in a form approved by the City Attorney.

Fiscal Impact:

The contract amount for each firm is not-to-exceed $2,500,000 for a term of five (5) years to provide design engineering services. No Purchase Orders (PO) will be opened upon execution of these agreements. The Engineering Division will process POs on an as-needed basis with selected firms to provide the engineering services. It is CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
ON-CALL ENGINEERING SERVICES – AWARD OF PROFESSIONAL SERVICES

AGREEMENTS

Page 3 of 5 ends

anticipated that future work may be awarded to any of the consulting firms, depending on their competitive task proposals that they will submit on a project-by-project basis.

Accounts for the PO’s will be established based on the task-order and projectappropriated funding source(s) associated with each City capital project assigned to the consulting firm. Funding will be based on appropriations approved for each project’s budget, with funds such as Local Return funds, applicable State grants and budgeted General Fund.

Discussion:

The Public Works Department develops plans, specifications and estimates for Capital Improvement Projects (CIP). In anticipation of the implementing and streamlining projects approved in the City’s adopted budget, staff recommends for the City to have access to on-call engineering services for various Public Works projects. Typical services provided under this procurement include planning, project management, community outreach, preliminary engineering, environmental studies, surveying, utility coordination, right of way coordination and determination, preparation of engineering plans specifications, estimates, and grant administration assistance. The services will be provided for, but not limited to, roadway pavement rehabilitation and/or restoration, streetscape, landscaping and irrigation systems, utility, bridges, safety lighting, traffic signal, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks, general facilities and other Public Works construction projects. All services will be provided on an as-needed basis.

A Request for Proposals (RFP) for on-call engineering services was posted on PlanetBids through the City’s website on January 3, 2024. On February 14, 2024, the City received proposals from 26 firms in response to the RFP. A panel of four (4) staff members independently reviewed the proposals submitted by each firm and scored them based on the qualifications criteria prescribed in the RFP, including responsiveness, capabilities, experience, knowledge, expertise of the firm, qualifications, educational background, track record of proposed team members working together on relevant projects/services, and quality of past performance for the City or similar agencies.

In order to maximize the City’s flexibility, staff recommend awarding contracts to 16 firms to provide engineering services. The 16 firms are necessary because approximately 7-8 firms we are considering as specialty firms that will provide specific trade engineering design (i.e. electrical, structural, rail, etc.). The other 8-9 firms will be general in nature. Due to turnover in staff from consultants and firms being bought out at a growing pace, we feel this number is necessary. On top of that, due to the list of CIP projects requiring design services, more firms may be needed.

CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
ON-CALL ENGINEERING SERVICES – AWARD OF PROFESSIONAL SERVICES

AGREEMENTS

Page 4 of 5 ends

The recommended firms are HDR Engineering, Inc., Willdan Engineering, D’Leon Consulting Engineers, IMEG, JMDiaz, Inc., Cordoba Corporation, Kimley Horn & Associates, Inc., Southstar Engineering and Consulting, Inc., Mark Thomas & Company, Inc., NV5, Inc., NCM Engineering Corp., AKM Consulting Engineers, Onward Engineering, Alta Planning & Design, Inc., BKF Engineers and Yao Engineering Inc.

The City reserves the right to assign projects to one or more of the consultants at its sole discretion based on project requirements, the requirements of the funding source for the project, as well as the availability and ability of each consultant. Selection of a firm does not necessarily guarantee the award of work of any specific contract value.

Having a large pool of consultants will offer the City a wide range of expertise, allow for availability of resources and maintain competitive pricing when selecting firms for specific projects and/or task orders.

A summary of the final ranking of each firm is presented below:

Ranking Consulting Firm Ranking Consulting Firm
1 HDR Engineering, Inc. 14 Alta Planning & Design Services 2 Willdan Engineering 15 BKF Engineers
3 D’Leon Consulting Engineers 16 YAO Engineering
4 IMEG 17 KPFF
5 JMDiaz, Inc. 18 TAIT
6 Cordoba Corporation 19 SA Associates
7 Kimley Horn & Associates, Inc. 20 TRANSTECH
8 Southstar Engineering & Consulting 21 RKA Consulting Group 9 Mark Thomas & Company, Inc. 22 TKE
10 NV5 23 GTS (General Technologies &
Solutions)
11 NCM Engineering Corp. 24 Minagar & Associates
12 AKM Consulting Engineers 25 West & Associates
13 Onward Engineering 26 FEI Associates
Conclusion:

Staff recommends selecting the following 16 firms to provide on-call engineering services:

1. HDR Engineering, Inc. 9. Mark Thomas & Company, Inc.

2. Willdan Engineering 10. NV5

3. D’Leon Consulting Engineers 11. NCM Engineering Corporation

4. IMEG 12. AKM Consulting Engineers

5. JMDiaz, Inc. 13. Onward Engineering

6. Cordoba Corporation 14. Alta Planning & Design Services

7. Kimley Horn & Associates, Inc. 15. BKF Engineers

8. Southstar Engineering & Consulting 16. YAO Engineering CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
ON-CALL ENGINEERING SERVICES – AWARD OF PROFESSIONAL SERVICES

AGREEMENTS

Page 5 of 5 ends

The Professional Service Agreements are for a term of five (5) years for an amount of up to $2,500,000 each. The selected qualified firms will be available to provide services on an as-needed basis for engineering services in the delivery of a variety of projects.

These firms may be contacted during the term of the agreement to provide a fee proposal for individual task orders in accordance with the procedural requirements of the funding source for each project.

Steve Carmona
SC:NN:KG:np
Enclosures: 1) Professional Services Agreement – HDR Engineering, Inc. 2) Professional Services Agreement – Willdan Engineering 3) Professional Services Agreement – D’Leon Consulting Engineers 4) Professional Services Agreement – IMEG
5) Professional Services Agreement – JMDiaz, Inc.
6) Professional Services Agreement – Cordoba Corporation 7) Professional Services Agreement – Kimley Horn & Associates, Inc. 8) Professional Services Agreement – Southstar Engineering and Consulting, Inc
9) Professional Services Agreement – Mark Thomas & Company, Inc. 10)Professional Services Agreement – NV5, Inc.
11)Professional Services Agreement – NCM Engineering Corp. 12)Professional Services Agreement – AKM Consulting Engineers 13)Professional Services Agreement – Onward Engineering 14)Professional Services Agreement – Alta Planning & Design, Inc. 15)Professional Services Agreement – BKF Engineers
16)Professional Services Agreement – Yao Engineering Inc.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND
HDR ENGINEERING, INC.

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and HDR Engineering, Inc., (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call engineering services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : April 23, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 1
13a
Professional Services Agreement
HDR ENGINEERING, INC.

Page 2 of 14 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of Two Million Five Hundred Thousand Dollars ($2,500,000.00), unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement
HDR ENGINEERING, INC.

Page 3 of 14 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. Mark Christoffels, Project Manager, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement.

No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 4 of 14 ends

12. INDEPENDENT CONTRACTOR

12.1 Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City.

12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.3 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

12.4 The Parties further acknowledges the following: (i) that Consultant shall provide the services outlined in the Scope of Services directly to City; (ii) Consultant maintains a business location at the address listed under Section 20 that is separate and distinct from the City; (iii) Consultant contracts with other businesses to provide the same or similar services and maintains a clientele without restriction from the City; (iv) Consultant advertises and holds itself out to the public as available to provide the same or similar services; (v) unless otherwise specified in this Agreement, Consultant provides its own tools, vehicles, and equipment necessary for performing the Scope of Services; (vi) Consultant has proposed and negotiated its own rates; and (vii) consistent with the nature and demands of the project and the City’s business hours, Consultant may set its own hours and location of work.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 5 of 14 ends

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives Professional Services Agreement
HDR ENGINEERING, INC.

Page 6 of 14 ends

its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 7 of 14 ends

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 8 of 14 ends

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 9 of 14 ends

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20. NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

Professional Services Agreement
HDR ENGINEERING, INC.

Page 10 of 14 ends

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Thomas T. Kim, Senior Vice
President
HDR Engineering, Inc.
350 South Grand Ave. Suite 2900
Los Angeles, CA 90071
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt Professional Services Agreement
HDR ENGINEERING, INC.

Page 11 of 14 ends

to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 12 of 14 ends

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

Professional Services Agreement
HDR ENGINEERING, INC.

Page 13 of 14 ends

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This section intentionally left blank]
Professional Services Agreement
HDR ENGINEERING, INC.

Page 14 of 14 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”
CITY OF PICO RIVERA HDR ENGINEERING, INC.
______________________________ ___________________________________ Andrew C. Lara, Mayor Thomas T. Kim, Senior Vice President Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney

EXHIBIT A

SCOPE OF SERVICES

PROPOSAL FOR ON-CALL

ENGINEERING SERVICES
City of Pico Rivera
February | 2024
COPY
01 PROPOSAL
02 A. Letter of Offer................................................................................................................ 01 03 B. Qualifications of the Firm............................................................................................. 05 04 C. Proposed Staffing...........................................................................................................11 05 D. Consultants and/or Sub-Consultants.......................................................................... 15 06 E. Work Approach.............................................................................................................. 23 07 F. Client References........................................................................................................... 29 08 G. Rights to Materials........................................................................................................ 30 09 10 ADDITIONAL ATTACHMENTS
11 H. Schedule of Hourly Rates................................................................................RATES-01 12 I. Non-Collusion Affidavit..........................................................................................AFF-01 13 J. Exceptions or Additions to Sample Agreement..................................................EXC-01 14 K. Resumes ................................................................................................................RES-01

TABLE OF CONTENTS
*HDR acknowledges the page count and page exclusions set forth in both the RFP and Q&A Set 1 and Set 2 (i.e. Dividers, Table of Contents, Schedule of Hourly Rates, Non-Collusion Affidavit, Exceptions or Additions to Sample Agreement, and Resumes do not count towards the total 30-page limit of the proposal)* Proposal
Proposal
A. Letter of Offer
A. Letter of Offer
01 February 14, 2024
City of Pico Rivera
Noe Negrete, PE - Director of Public Works
6615 Passons Boulevard
Pico Rivera, CA 90660
RE: Request for Proposals (RFP) to Provide On-Call Engineering Services Dear Noe Negrete,
The coming years look exciting and full of promise for the City of Pico Rivera (City) as it moves forward with multiple initiatives to transform its economic base with technology-based businesses, create a regional transportation hub, establish a regional sports complex, and pursue local infrastructure improvements to expand mobility choices and create more equity for its residents. In addition, the City will be implementing an expansive infrastructure program of roadway pavement rehabilitation, streetscapes, landscaping and irrigation systems upgrades, utility improvements, bridge upgrades, safety lighting installation, new and modified traffic signals, rail/transit facilities, active transportation and complete streets facilities, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, upgraded and new parks/playgrounds/trails, as well as building improvements.

The City needs a strong partner to help identify, develop, budget, plan, design, and deliver these projects to meet your initiatives. HDR Engineering, Inc. (HDR) is that partner. We will accomplish this by providing you with a highly qualified team that you can trust to deliver your programs and projects. The HDR Team offers:
• An experienced Project Manager, Mark Christoffels, PE, PLS, who has over 38 years of experience, including tenure as the City Engineer for the City of Long Beach and Chief Engineer for the San Gabriel Valley Council of Governments (SGVCOG). His responsibilities included oversight of major capital programs, including transportation and mobility programs, grade separations, National Pollution Discharge Elimination System (NPDES) programs, and related storm water quality projects.

He also established subregional funding allocations and project implementation for Measures W, R, and M Programs. Mark brings strong project management leadership with project controls expertise, plus a broad municipal background that covers multiple disciplines, including complete streets, facilities, and water resources. He will be supported by highly qualified professional engineers, scientists, and subjectmatter experts as needed to serve the City. • A dedicated and local Principal-in-Charge, Gene Bougdanos, PE, who has more than 40 years of experience planning, designing, and constructing infrastructure projects. Gene served as a Program Manager for SGVCOG and managed multiple on-call contracts and Task Orders (TOs) with other agencies, including the Los Angeles County Metropolitan Transportation Authority (LA Metro), Port of Los Angeles (POLA), California Department of Transportation (Caltrans), Los Angeles County A. LETTER OF OFFER
02 Department of Public Works (LACDPW), and the City of Los Angeles Bureau of Engineering (LABOE).

Gene will combine this expertise with his knowledge of responsive and cost-effective TO delivery as he provides support to Mark, our Project Manager, out of our Los Angeles office. • A solid team of professional Task Leads and experts in their respective fields with experience in delivering capital projects for municipalities and regional agencies. We have successfully provided client services related to roadway pavement rehabilitation, streetscapes, landscaping and irrigation systems, utilities, bridges, safety lighting, traffic signals, rail/transit facilities, active transportation and complete streets facilities, water treatment and distribution systems, sewer systems, storm drains and park facilities. Our depth of resources gives us the immediate availability to execute a broad range of multiple TOs simultaneously, providing you with the needed technical skills on demand. We implement projects efficiently through our identified discipline leads which were selected based on your Scope of Services and have experience in delivering complex TO assignments. • Well-established project controls to provide efficient project delivery on time and within budget.

HDR has the scheduling, estimating, and project cost tracking software tools and state-of-the-art internal accounting and project management tools to keep your programs and projects on track. For each TO, we will provide a Project Management Plan with the appropriate level of detail scalable to the size of the TO and will guide the project to successful delivery.
• Familiarity with local, regional, and state agencies that will be stakeholders in the City’s capital improvement efforts. As the future of infrastructure investment unfolds in and around the City, HDR’s decades of relationships with the state and regional agencies, the councils of government, the resource agencies, and adjoining cities will significantly benefit the City. HDR also brings program management experience and expertise in obtaining funding through grant applications for our clients. Our environmental team members shine with recent successes in obtaining environmental clearances with multiple agencies.

The HDR Team combines continuity and experience with a commitment to giving you quality and reliable, professional services. Further details of our capabilities and relevant experience are shown throughout this proposal, demonstrating that our team possesses the expertise, commitment, and vision to deliver your projects successfully. In addition, our team is comprised of highly respected sub-consultants, with whom HDR has a solid history of working together. They are listed below.

Legal Name of Company
Address | DIR Registration
Contact Person
Telephone | Email
Amheart Solutions (DBE, DVBE, SBE)
511 South Harbor Boulevard, Unit R, La Habra, CA 90631
DIR: PW-LR-1001102438
Pauly Jung
714.869.4756
[email protected]
Arellano Associates, LLC (DBE, SBE)
5851 Pine Avenue, Suite A, Chino Hills, CA 91709
DIR: PW-LR-1000446549
Genoveva Arellano
909.627.2974
[email protected]
Geo-Advantec, Inc. (SBE)
457 West Allen Avenue, Suite 113, San Dimas, CA 91773
DIR: 1000017767
Shawn Ariannia, PhD, PE, GE
909.305.0400
[email protected]
03 City of Pico Rivera, On-Call Engineering Services
A. Letter of Offer
Legal Name of Company
Address | DIR Registration
Contact Person
Telephone | Email
GPA Consulting (DBE, SBE)
840 Apollo Street, Suite 312, El Segundo, CA 90245
DIR: 1000035318
Ryan Todaro
310.792.2690, ext. 107
[email protected]
Guida Surveying, Inc. (SBE)
220 Commerce, Suite 150, Irvine, CA 92602
DIR: 1000006862
Tim Fettig, PLS
949.777.2023
[email protected]
Kroner Environmental Services, Inc. (DBE, SBE)
10801 National Boulevard, Suite 415, Los Angeles, CA 90064 DIR: 1000023614
Tamara Kroner
310.474.1500
[email protected]
Suenram and Associates, Inc. (DBE, SBE)
445 South Figueroa Street, 31st Floor, Los Angeles, CA 90071 DIR: 1000063959
Kate Suenram, PE
213.297.7050
[email protected]
Tatsumi and Partners, Inc. (DBE, SBE)
49 Discovery, Suite 120, Irvine, CA 92618
DIR: 1000007452
Michael Aceves
949.453.9901
[email protected]
V&A, Inc. (DBE, SBE)
1111 South Grand Avenue, Suite 103, Los Angeles, CA 90015 DIR: 1000036811
Jose Valle
213.972.9700
[email protected]
Our responsive and qualified team is local and can mobilize quickly upon receiving a Notice to Proceed (NTP). We encourage you to check our references included in Section F Client References as evidence of the quality of our work. HDR is prepared to accept the City’s Sample Professional Services Agreement with some minor requested modifications which have been outlined in Section J Exceptions or Additions to Sample Agreement. Our commitment to you is to complete TOs to your satisfaction.

We appreciate the opportunity to continue our successful track record of delivering TO projects for local cities’ and counties’ capital improvement programs. If you have questions regarding our submittal, please do not hesitate to call our Project Manager, your primary point of contact, Mark Christoffels, at 714.442.2850 or [email protected]. Company details and RFP acknowledgments are provided on the following page.

Sincerely,
HDR Engineering, Inc.

Thomas T. Kim, PE (CA #57374) Mark Christoffels, PE (CA #40599), PLS (CA #6324) Senior Vice President Project Manager
04 Company Details Acknowledgments
Identification of
Consulting Firm
HDR Engineering, Inc.
350 South Grand Avenue
Suite 2900
Los Angeles, CA 90071
213.239.5800

1.Proposal shall remain valid for a period of not less
than 90 calendar days from the date of submittal.

2.HDR acknowledges we are obligated by all
addenda to this RFP. No addenda was released,
but we acknowledge Questions and Answers
(Q&A) Set 1 dated February 05, 2024 and Q&A Set
2 dated February 06, 2024.

3.This proposal is signed by Tom Kim, a person
authorized to bind HDR to the terms of the RFP.

4.All information submitted with the proposal, to the
best of our knowledge, is true and correct.

Contact Person Mark Christoffels, PE, PLS
Project Manager
1851 East First Street
Suite 1400
Santa Ana, CA 92705
714.442.2850
Federal Tax ID 47-0680568
DIR Registration 1000018262
B. Qualifications of the Firm
B. Qualifications
of the Firm
05 City of Pico Rivera, On-Call Engineering Services
B. Qualifications of the Firm
Firm Profile
Founded in 1917 and incorporated in 1985, HDR is
supported by more than 12,500 employee-owners
in more than 200 locations worldwide. We have
been a part of the Southern California business
landscape for over 45 years, with 9 office locations,
including Los Angeles (137 employees), Long Beach
(26 employees), Ventura (6 employees), Santa Ana
(63 employees), Irvine (172 employees), Riverside
(46 employees), Claremont (22 employees), San
Diego-Camino De La Reina (81 employees) and San
Diego-B Street (25 employees).

Locally, we have over 550 professionals
who specialize in engineering and planning
disciplines, including roadway, structures, traffic,
environmental, geotechnical, public outreach,
program management, computer-aided drafting
(CAD), landscape architecture, finance, sewer, water
resources, waterworks, and right-of-way services.

In Los Angeles County alone, we have over
160 staff that are local and available to support
the City.

Our portfolio includes a variety of transportation
and horizontal infrastructure projects similar to
the potential project types identified in the RFP.

Over the past 10 years, HDR’s experienced
professionals have successfully delivered over
250 contract TOs through our multiple on-call
contracts for agencies, including the City of
Pico Rivera, LABOE, City of Long Beach, Port of
Long Beach (POLB), Culver City Transportation
Department, LA Metro, and LACDPW. HDR was
also recently selected for an on-call engineering
services contract with the City of South Pasadena.

Ability to Manage, Control, and Schedule
Concurrent Projects and Tasks at
Multiple Locations
HDR will manage this contract using a web-based
management program as a work planning tool.

It provides a 12-month lookahead work plan that
we incorporate into our projects. In addition, our
transportation group has weekly resource planning
meetings with section managers (operational)
and project managers. This results in the efficient
utilization of resources without double booking. This
is updated weekly by our project managers. For
each TO, we will also provide a Project Management
Plan that will guide the project to successful
delivery. We discuss this plan further in Section E
Work Approach.

Financial Condition of the Firm
Our firm has the financial stability, capacity, and
resources to successfully deliver TOs for the City.

No financial, litigation, or business conditions
exist that will impede our ability to perform the
required Scope of Services. As an employeeowned firm, our assets are managed and invested with exceptional care. Our financial statements are
prepared and audited annually by Ernst & Young
LLC, including a Federal Acquisition Regulation
audit. We are financially sound with gross revenues
of $3.2B, a current working capital ratio of 1.9, and
stockholders’ equity of $0.66B (2022).

B. QUALIFICATIONS OF THE FIRM
06 Previous Project Experience with Sub-Consultants
HDR has partnered with sub-consultants that have experience working with the City and local agencies within Los Angeles County. They will provide additional resources required to successfully complete the required Scope of Services. Previous project experience with our sub-consultants is shown in Table B.1 below. HDR served as Prime for all of the projects listed below and provided a range of engineering services.

Table B.1: List of Previous Project Experience with Sub-Consultants Firm Previous Project Experience with HDR | Role and Responsibilities Amheart
Solutions
• LA Metro, Link Union Station (Link US) Project | Sub-Consultant: Architectural/ Engineering Support
• Los Angeles World Airports (LAWA), Automated People Mover (APM) Landside Access Modernization Program | Sub-Consultant: Architectural/Engineering Support Arellano
Associates,
LLC
• LA Metro, I-605 Corridor Improvement Project (CIP) Project Approval and Environmental Document (PA&ED) | Sub-Consultant: Public Outreach • LA Metro, High Desert Corridor Service Development Plan (SDP) | Sub-Consultant:

Public Outreach
GeoAdvantec, Inc.
• LA Metro, Lynwood Intersection Improvements Plans, Specifications and Estimate (PS&E) | Sub-Consultant: Geotechnical Support
• LA Metro, Rosecrans Avenue/Atlantic Avenue and Artesia Boulevard/Santa Fe Intersection Improvements | Sub-Consultant: Geotechnical Support GPA
Consulting
• City of Ventura, Main Street Bridge over Ventura River Phase 1 Environmental Engineering Services | Sub-Consultant: California Environmental Quality Act (CEQA)/ National Environmental Policy Act (NEPA) Process Support • City of Long Beach, Shoemaker Bridge Replacement PA&ED and PS&E | SubConsultant: Water Quality Assessment Report, Section 4(f) Evaluation, Historical Resources Evaluation Report Support
Guida
Surveying,
Inc.
• LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program | Sub-Consultant: Professional Land Surveying Services
• LA Metro, City of Compton Intersection Improvements PA&ED | Sub-Consultant:

Topographic Surveys and Record Land Net Mapping
Kroner
Environmental
Services, Inc.
• LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E | Sub-Consultant:

Hazardous Waste Investigations
• LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E | Sub-Consultant:

Hazardous Materials Investigation and Report
Suenram and
Associates,
Inc.
• LA Metro, Southeast Gateway Line Transit Corridor Advanced Engineering (formerly known as West Santa Ana Branch Advanced Engineering) | Sub-Consultant: Utility Design and Coordination
• Metrolink, On-Call Professional Engineering Design Services, I-605/Temple Avenue Grade Separation | Sub-Consultant: Utility Design Review Tatsumi and
Partners, Inc.
• LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E | Sub-Consultant:

Irrigation and Planting
• LA Metro, West Los Angeles Veterans Affairs (VA) Medical Center Parking Structure | Sub-Consultant: Irrigation
V&A, Inc. • LA Metro, Southeast Gateway Line Transit Corridor Advanced Engineering | SubConsultant: Civil/Roadway and Traffic Engineering • LA Metro, Link US Project | Sub-Consultant: Civil Engineering and Architecture 07 City of Pico Rivera, On-Call Engineering Services
B. Qualifications of the Firm
Strength and Stability of the
Firm
HDR has not been acquired by or merged with any
other companies since becoming employee-owned
in 1996. We take pride in our strategic plan to remain
independent, subsequently bringing consistency,
stability and strength to our operational efficiency.

We have one of the lowest turnover rates in the
industry. HDR has a focused approach to sustain
our clients’ satisfaction by providing permanence
in our leadership and providing empowered and
motivated staff to work on your projects.

HDR is growing in numbers and expertise. In
2021, HDR acquired WKE, expanding our growth
and adding key resources in addition to the
great staff that was already available in Southern
California. HDR’s acquisition program supports our
strategic growth objectives of enhancing company
capabilities, broadening service offerings, and
expanding geographically to best serve new and
existing clients. Our acquisition investments are a
key part of our long-term growth strategy. We look
at acquisitions to help us deepen our core services
in markets, expand our geographical presence and
grow new services for our clients.

Current Staffing Capability
The HDR Team is available to provide the City with
an entire range of skills for TOs included under this
contract. We are a full-service company with project
managers, discipline leads, and technical experts
that have the experience and understanding to
successfully execute your projects. With thousands
of people in hundreds of locations, we provide
experienced professionals to complement your
existing expertise, providing depth when you need it
and meeting the unique demands of your contract.

Current Staffing Availability and Work
Load
HDR has assembled a team of key personnel and
support staff for this contract based upon numerous
factors. Area of expertise, type and amount of
experience, and availability play a role when we
decide who is best to include on a given project
organizational chart. This personnel selection
process is critical in verifying the City has access to experts in particular specialties and disciplines as
required by the Scope of Services. All of the key
personnel that we have proposed in Section C
Proposed Staffing are 100 percent committed to
serving the City on this contract.

Proven Record of Meeting Schedules on
Similar Types of Projects
Our team specializes in the use of Microsoft Project
and Primavera P6 to establish the primary project
schedule in accordance with the work breakdown
structure so that cost, duration, and resources can
be integrated into each work element for budgeting
and monitoring purposes. We can implement
detailed resource-loaded TO schedules to verify
adequate staffing for on-time delivery.

The depth and range of HDR’s experience in
meeting schedules on similar types of projects
are demonstrated by the successful completion
and delivery of awarded contracts for both oncall and specific projects for numerous agencies.

Specific examples are provided on the following
pages along with Table B.2 which demonstrates
HDR’s capabilities and capacity to deliver
elements of the Scope of Services. We have also
highlighted additional project proofs in Section E
Work Approach.
08 The City contracted with HDR to assist with evaluating the potential for a transit hub within their jurisdiction that would include relocation of the existing Metrolink station from Commerce to Pico Rivera, the establishment of a BRT along the adjacent north-south Lakewood-Rosemead Boulevard corridor from Long Beach to Pasadena, and the incorporation of the proposed Metro E Line Station at Washington Boulevard on this corridor. The project included coordinating with SGVCOG on their Transit Feasibility Study, focusing on their BRT recommendation for Rosemead Boulevard and providing an analysis of the potential benefits and impacts to a BRT route on Rosemead Boulevard in the City. HDR was also tasked with coordinating with the Gateway Cities Council of Governments (GCCOG) on their Lakewood/Rosemead Boulevard Master Plan and Complete Street Evaluation Report and providing an analysis of what elements would have to be modified to pursue a BRT along this corridor. HDR provided the City with a summary of potential regional coordination issues; drafted an implementation schedule; assisted with coordination meetings with LA Metro, Long Beach Transit, and cities along the proposed BRT corridor; and prepared a white paper on the potential creation of a Rosemead-Lakewood Boulevard BRT corridor Joint Powers Authority (JPA) along with a draft JPA Agreement.

City of Pico Rivera and LA Metro, Rosemead-Lakewood Boulevard BRT | Los Angeles County, CA Table B.2: HDR Project Experience with Delivering Scope of Services HDR Relevant Project Experience
Scope of Services
A. Project ManagementB. Community OutreachC. Preliminary Eng and Planning StudiesD. Surveys, Mapping and Field ReviewsE. Environmental Studies and DocumentationF. Utility Research and CoordinationG. Right-of-Way Phase and DeterminationH. DesignI. Construction Phase AuthorizationJ. Bid Support ServicesK. Construction Support ServicesL. Grant AdministrationM. Prior Rights Expertise City of Pico Rivera and LA Metro, RosemeadLakewood Boulevard Bus Rapid Transit (BRT) l l l l l l l
City of Long Beach, As-Needed Contracts l l l l l l l l l l l l l LA Metro, On-Call Highway Program Project
Delivery Support Services
l l l l l l l l l l l
LABOE, On-Call Civil Engineering Consulting
Services, Safe Sidewalks LA Program
l l l l l l l
LACDPW, As-Needed Eng Design & Support
Srvcs for the Road/Flood Control Construction
l l l l l l
09 City of Pico Rivera, On-Call Engineering Services
B. Qualifications of the Firm
Since 2010, HDR has been providing professional engineering, traffic, transportation planning, and environmental consulting services, as well as agency coordination (Caltrans, GCCOG, LACDPW), for various projects under multiple on-call contracts for the City of Long Beach.
6th Street Corridor Bicycle Boulevard: The project included design of roadway, landscaping, signing, striping, signal and sidewalk ramp improvements for the purposes of constructing a 2-mile-long bicycle boulevard on the existing 6th Street residential roadway.

Spring Street Mixed-Use Development Initial Study/Mitigated Negative Declaration (IS/MND) and Environmental Impact Report (EIR): HDR prepared a CEQA IS/MND for the mixed-use development project. Street improvements will include widening of Orange Avenue, sidewalk improvements to Spring Street, additional crosswalks at project site entrances, and the construction of new bicycle facilities along Orange Avenue and Spring Street.

Other Completed TOs: Shoemaker Bridge Water Quality Assessment and Storm Water Report; Design improvements for Multiple Park Lots; Atlantic Boulevard Seismic Certification; Davenport Park Regulatory Compliance Monitoring Services; Deforest Wetlands Independent Quality Review; Stearns Park Baseball Field Design Services; Whaley Field Baseball Facility Cost Estimate; San Gabriel River Bike Path Gap Closure; Waste to Energy Facility Inspection and Capital Expenditure Planning; and Americans with Disabilities Act (ADA) Curb Ramp Design.

City of Long Beach, As-Needed Contracts | Long Beach, CA Since 2020, HDR has been providing roadway, structure, and drainage engineering services, as well as agency coordination (Caltrans, GCCOG, LACDPW), as part of LA Metro’s On-Call Highway Program Project Delivery Support Services contract.

Whittier Boulevard Intersection Improvements PS&E: HDR is currently leading the project while completing aspects of the roadway design and supporting LA Metro with right-of-way engineering. The proposed improvements include enhancing mobility, relieving congestion, and reconstructing sidewalks and curb ramps to ADA compliance at the intersections of Painter Avenue and Santa Fe Springs Road (5-Points) on Whittier Boulevard.

City of Compton Intersection Improvements PA&ED: HDR delivered environmental approval and 35 percent engineering for proposed improvements for the City of Compton, in cooperation with the County of LA, to move forward with final design. The project proposed implementing focused congestion mitigation measures with intersection improvements at Rosecrans Avenue/Atlantic Avenue and Artesia Boulevard/ Santa Fe Avenue, providing congestion relief during peak hours.

City of Lynwood Imperial Highway Corridor Capacity Enhancements PA&ED and PS&E: HDR completed final PS&E and is providing design services during construction (DSDC) for the City of Lynwood at 11 intersections. Proposed enhancements include operational and safety improvements and signal synchronization with additional geometric improvements at 6 of the 11 intersections.

LA Metro, On-Call Highway Program Project Delivery Support Services | Los Angeles County, CA 10 In 2018, HDR was selected by LACDPW to provide as-needed engineering design and support services on various federally and non-federally funded projects located throughout Los Angeles County.

Los Angeles River Bike Path: HDR is providing a constructability assessment and design services, including preparation of signing and striping plans for the proposed bicycle path as well as construction phasing and traffic control plans for the construction of the Lankershim Boulevard undercrossing.

Soledad Canyon Road Bridge over the Santa Clara River: HDR is providing bridge design services for a replacement bridge over the Santa Clara River. The project will replace the existing 27-foot-wide by 31-footlong timber deck bridge with a new 44-foot-wide by 325-foot-long cast-in-place post-tensioned concrete box girder bridge. The proposed bridge replacement is part of LACDPW’s overall reconstruction of Soledad Canyon Road between Agua Dulce Canyon Road and the Santa Clara River. HDR is providing design support to prepare the final PS&E for the proposed replacement.

Norwalk Boulevard and Slauson Avenue Traffic and Pavement Improvements: HDR is currently providing traffic engineering services for a proposed 2-mile-long pavement preservation and road improvement project on Norwalk Boulevard and Slauson Avenue. HDR is providing services required for the preparation of traffic design plans and traffic control plans using the latest standards from the California Manual on Uniform Traffic Control Devices (MUTCD).

LACDPW, As-Needed Engineering Design and Support Services for the Road/Flood Control Construction | Los Angeles County, CA
In 2016, the City of Los Angeles launched Safe Sidewalks LA Program, a 30- year, $1.4B program to make sidewalks accessible. HDR has been the program management consultant since program inception and provided site assessment, design, and construction management of sidewalks and curb ramps throughout the City of Los Angeles.

Initially, HDR performed site visits at city facilities, which included assessing existing conditions, collecting field measurements, taking photographs, preparing engineer’s estimates, developing and issuing construction bid packages, reviewing bids, awarding construction contracts, and providing construction management services during construction. The program has evolved into the Sidewalk Division within the LABOE that encompasses three main areas of addressing the City of Los Angeles’ ADA sidewalk compliance – access request, city facilities, and program access improvements.

HDR’s current role includes overall program management duties, providing ongoing program process improvements to increase capacity and efficiency; providing design and construction management services.

As program manager and designer, HDR has assisted the LABOE in delivering 1920+ curb ramps and 90+ miles of sidewalk.

LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program | Los Angeles, CA
C. Proposed Staffing
C. Proposed Staffing
Mark has over 38 years of experience managing capital improvement programs and projects primarily as the City Engineer and Public Works Director for several cities in both Los Angeles and Orange Counties, including 11 years as City Engineer for the City of Long Beach. More recently, he served as SGVCOG’s Chief Engineer responsible for the establishment of the subregional funding allocations and project implementation for its 30 member agencies under Measures W, R, and M Programs. Mark also served 4 years as an appointee to the Policy Advisory Council of LA Metro.

Mark Christoffels, PE, PLS
Project Manager; A. Project Management D. Surveys, Mapping and Field Reviews Task Lead
Education: MBA, Business Administration | BS, Civil Engineering Gene has over 40 years of experience in the planning, design, and construction management of transportation infrastructure projects. He has led and managed the planning and design on a number of large transportation projects. He has also managed on-call contracts and TOs with numerous agencies, including LA Metro, POLA, LACDPW, LABOE, and Caltrans. Gene has expanded his familiarity with the specifications and standards applicable to each of his contracts with these various agencies.

Gene Bougdanos, PE
Principal-in-Charge
Education: MBA, Business Administration | BS, Civil Engineering 11 City of Pico Rivera, On-Call Engineering Services
C. Proposed Staffing
Key Personnel Qualifications and Experience
HDR will leverage our well-structured team, inclusive of expert leadership and optimal staffing levels needed to carry out the effort required for this on-call contract. As Project Manager, Mark will provide overall management of the team and contract. His ability to manage and deliver successful projects is due to employing a team committed to producing innovative, constructible, and cost-effective designs. Upon receiving NTP for a TO, Mark will work with the City’s Project Manager to develop or confirm the scope of work and match the expertise of our team with the TO scope to develop a staffing plan. This initial coordination with the City’s Project Manager will provide a full understanding of the project objectives and critical schedule for the deliverables.

Each of our key personnel was selected for their roles based on specialized expertise, past experience, and other specialized knowledge specific to the Scope of Services subject matter. They are 100 percent committed to serving the City on this contract. Brief bios that highlight the educational background and experience of our key personnel are included on the following pages. Resumes for all proposed personnel, including key personnel, are included in the resumes section of Additional Attachments.

C. PROPOSED STAFFING
JC has over 23 years of extensive hands-on experience in community outreach, stakeholder engagement, crisis and multicultural communications, media relations, and international relations. He has worked in the full spectrum of our industry, supporting nonprofits, governments, and corporations, promoting social change through his commitment to improving the quality of life of people.

JC Erickson
B. Community Outreach Task Lead
Education: MA, Global Studies | BA, Philosophy, Religion, and Ethics George has over 12 years of experience in environmental planning, policy, project management, and regulatory compliance. He manages the preparation of NEPA and CEQA documents and technical studies for numerous federal, state, and local agencies. George is also a licensed attorney in Colorado and Washington, D.C.

George Gorman
E. Environmental Studies and Documentation Task Lead
Education: JD, Law | MA, Resources Law | BA, Philosophy and Psychology John has over 43 years of experience in the management of public capital improvement projects. He has worked on numerous highway projects with improvements on state right-of-way. He has overseen the preparation of the conflict maps and matrix and has led the preparation of relocation claim letters.

John also has experience preparing utility agreements for Caltrans approval reviews.

John Ballas, PE
F. Utility Research and Coordination Task Lead; M. Prior Rights Expertise Task Lead Education: BS, Civil Engineering
Danny has over 22 years of experience in the right-of-way industry. He has worked on projects related to acquisition, relocation, project management, property management, and project estimating/ budgeting. Danny has been instrumental in the development of key project schedules and budgets for large multimillion-dollar projects.

Danny Mendoza
G. Right-of-Way Phase and Determination Task Lead
Education: College Coursework
Wayne has over 31 years of extensive planning, civil engineering, and project management experience.

His direct experience includes the preparation and review of project planning documents, as well as bid documents for public facilities and infrastructure. Wayne’s project management experience includes project controls and leading multidisciplinary teams from planning and environmental approvals to PS&E.

Wayne Richardson, PE, ENV SP, LEED AP
C. Preliminary Engineering and Planning Studies Task Lead Education: BS, Civil Engineering | BA, Urban Planning
12 Henry has over 12 years of design experience in highway engineering projects. His experience includes designs of numerous regional and local highway facilities, roadway geometrics (horizontal and vertical), interchanges, analyses of Caltrans design exceptions, and preparation of detailed quantity and cost estimates. Henry is specialized in civil surface modeling with InRoads and has prepared 3-D design models for entire freeway interchanges and precise earthwork models for grade separation projects.

Henry Tong, PE
J. Bid Support Services Task Lead
Education: MS, Civil Engineering | BS, Civil Engineering Hank has more than 40 years of experience in transportation, including managing major highway corridor and bridge construction projects. He spent 21 years at Caltrans District 12 directing and managing engineering work related to highway, bridge, and infrastructure design projects. Hank has an insider’s knowledge and insight into the procedures, processes, and standards of Caltrans.

Hank Alonso, PE
K. Construction Support Services Task Lead
Education: BS, Civil Engineering
Robert has 32 years of transportation planning experience in the Southern California area. He has been instrumental in developing strategic planning studies for several of HDR’s clients and awardgenerating grant applications. Robert is an outside-of-the-box innovator in transportation project definition, transportation project development, and funding strategy design.

Robert Yates
I. Construction Phase Authorization Task Lead; L. Grant Administration Task Lead Education: BASc, Geography | AAS, Applied Horticulture and Horticultural Business Studies
Melissa has over 19 years of planning and design experience for transportation projects, including project management, roadway design, and the preparation of utility plans, utility coordination and preliminary relocation design; stage construction and traffic handling plans; quantities and cost estimates; and geometric design. She is skilled in leading multidisciplinary design teams. She has strong working relationships with LA Metro, Caltrans District 7, cities, and agency staff throughout Southern California.

Melissa Rodriguez, PE
H. Design Task Lead
Education: BS, Civil Engineering
13 City of Pico Rivera, On-Call Engineering Services
C. Proposed Staffing
14 C. Proposed Staffing
City of Pico Rivera, On-Call Engineering Services
C. Proposed Staffing
Organizational Chart
Our team was built to meet the anticipated needs of this contract, and we are well suited to staff your projects with local talent. Our organizational chart is shown as Figure C.1 below. Key personnel will be available to the extent proposed for the duration of the Professional Services Agreement (PSA), and HDR acknowledges that no person assigned to a project shall be removed or replaced without the prior written concurrence of the City.

Figure C.1: Organizational Chart

PROJECT MANAGER
Mark Christoffels, PE, PLS

CITY OF PICO RIVERA
Noe Negrete, PE

PRINCIPAL-IN-CHARGE
Gene Bougdanos, PE QUALITY MANAGER
Steve Crouch, PE
A. Project Management
Mark Christoffels, PE, PLS
Terence Pao, PE
Garrett Kaya, PE
B. Community Outreach
JC Erickson - Task Lead
Edna Jimenez (ARE)
Allyson Jeffers
Kolton Kammerer
L. Grant Administration
Robert Yates - Task Lead
Eric Rouse
Bruno Penet
Joel Lessard-Clouston, AICP

MANAGEMENT
D. Surveys, Mapping and Field Reviews
Mark Christoffels, PE, PLS - Task Lead
Tim Fettig, PLS (GSI)
H. Design
Melissa Rodriguez, PE - Task Lead
Josephus Rimorin, PE (V&A)
Shawn Ariannia, PhD, PE, GE (GAI)
Michael Aceves (T&P)
Myles Harrold, PE
Gary Goldman, PE, GE
Kent Ko, PE, TE
Brett Brandle, AIA, LEED AP BD+C
Doug Smith, PE
Yana Loginova, PE
Montse Martin, PE

ENGINEERING
C. Preliminary Engineering and Planning Studies
Wayne Richardson, PE, ENV SP, LEED AP -
Task Lead
Marie Lewis Adams, AICP
Doug Smith, PE
Jonathon Damora, EIT (AMH)
Rohit Itadkar, PE, TE
Alex Kemp, PE
E. Environmental Studies and Documentation
George Gorman - Task Lead
Ryan Todaro (GPA)
Jennifer Johnson (GPA)
Philip Jo, PE (KES)

PLANNING RIGHT-OF-WAY CONSTRUCTION
F. Utility Research and Coordination
John Ballas, PE - Task Lead
Kate Suenram, PE (S&A)
Raymond Ma, EIT
Ryan Quach, PE
G. Right-of-Way Phase and Determination
Danny Mendoza - Task Lead
Jill Craig
Ruben Duran
M. Prior Rights Expertise
John Ballas, PE - Task Lead
Annie Nguyen, EIT
Ryan Quach, PE
I. Construction Phase Authorization
Robert Yates - Task Lead
Eric Rouse
J. Bid Support Services
Henry Tong, PE - Task Lead
Rvee Pontepsiripong, PE
K. Construction Support Services
Hank Alonso, PE - Task Lead
Bill Wood, PE, CCM, QSP
Johnathan Lopez
Andrew Tee, PE
AMH Amheart Solutions DBE, DVBE, SBE
ARE Arellano Associates, LLC DBE, SBE
GAI Geo-Advantec, Inc. SBE
GPA GPA Consulting DBE, SBE
GSI Guida Surveying, Inc. SBE
KES Kroner Environmental Services, Inc. DBE, SBE
S&A Suenram and Associates, Inc. DBE, SBE
T&P Tatsumi and Partners, Inc. DBE, SBE
V&A V&A, Inc. DBE, SBE
Key Personnel
All personnel are HDR unless otherwise noted
D. Consultants and/or
Sub-Consultants
D. Consultants and/or
Sub-Consultants
Sub-Consultants
HDR strategically organized a team of subconsultants that bolsters our ability to provide the right expertise and depth of resources necessary
to provide services for this contract. Although the
City did not establish a small business goal, HDR
remains committed to an all-inclusive team that
includes local small businesses that will address
the Scope of Services required under this contract.

HDR has strong working relationships with our subconsultants, some which have spanned for more than 10 years. Previous project experience with our
sub-consultants was previously highlighted as Table
B.1 in Section B Qualifications of the Firm.

Responsibilities and descriptions of services to be
provided by our sub-consultants are outlined in the
following pages, as well as the address, telephone
number, and company profile for each subconsultant. References for our sub-consultants are highlighted in Table D.1 on the following pages.

Amheart Solutions (AMH) DBE, DVBE, SBE
Responsibilities: Civil Design Support
Address and Telephone Number: 511 South
Harbor Boulevard, Unit R, La Habra, CA 90631 |
714.869.4756
Founded in 2017, AMH is a recognized provider
of program management and design support
services. Their team of experienced professionals
offer a broad range of services, including project
management, construction management, document
control, project coordination, civil design support,
and CAD. Their proven track record includes a wide
range of projects for the City of Los Angeles, LA
Metro, LAWA, and POLB, including large-scale,
complex transportation infrastructure projects.

Arellano Associates, LLC (ARE) DBE, SBE
Responsibilities: Outreach Support
Address and Telephone Number: 5851
Pine Avenue, Suite A Chino Hills, CA 91709 |
909.627.2974
Founded in 1994, ARE is a professional services
consulting firm specializing in communications
and public outreach, community and government
relations, and strategic planning and marketing
programs. They have served many of Southern
California’s most important public programs.

ARE creates and executes specific and
tailored community engagement programs and
evaluate complex and difficult projects and
develop approaches and solutions that provide
positive results.

Geo-Advantec, Inc. (GAI) SBE
Responsibilities: Geotechnical, Pavement Analysis,
and Design Support
Address and Telephone Number: 457 West
Allen Avenue, Suite 113, San Dimas, CA 91773 |
909.305.0400
Founded in 2012, GAI provides a full range of
geotechnical engineering, materials testing, and
inspection services for multiple phases of projects
from conceptual design through construction.

They own a full-service laboratory accredited by
AMRL (AASHTO Materials Reference Laboratory).

GAI has a vast knowledge of regulations
governing geotechnical engineering/engineering
geology and public projects governing codes in
Southern California.
15 City of Pico Rivera, On-Call Engineering Services
D. Consultants and/or Sub-Consultants
D. CONSULTANTS AND/OR SUB-CONSULTANTS
GPA Consulting (GPA) DBE, SBE
Responsibilities: Environmental Support
Address and Telephone Number: 840 Apollo
Street, Suite 312, El Segundo, CA 90245 |
310.792.2690, ext. 107
Founded in 2023, GPA specializes in environmental
planning, biological resource studies, and historic
preservation planning. Their expertise includes
managing the environmental process in compliance
with CEQA, NEPA, Endangered Species Act (ESA),
California Fish and Game Code, Clean Water
Act (CWA), Section 106 of the National Historic
Preservation Act (NHPA), and Secretary of the
Interior’s Standards for the Treatment of Historic
Properties, among other state and federal laws.

Guida Surveying, Inc. (GSI) SBE
Responsibilities: Surveying Support
Address and Telephone Number: 220 Commerce,
Suite 150, Irvine, CA 92602 | 949.777.2023
Founded in 1995, GSI is a woman-owned land
surveying and mapping firm with a long history
of providing project-based and on-call services
throughout California. They have extensive
experience working with various clients, including,
but not limited to, LACDPW, LA Metro, Caltrans
District 7, POLA, POLB, LAWA, and multiple cities.

Kroner Environmental Services, Inc. (KES) DBE,
SBE
Responsibilities: Hazardous Materials Support
Address and Telephone Number: 10801 National
Boulevard, Suite 415, Los Angeles, CA, 90064 |
310.474.1500
Founded in 2004, KES is a full-service consulting,
design, planning, and construction services firm
that concentrates on environmental engineering
and environmental services. As a State of California
licensed engineering contractor certified to remove
hazardous substances, KES evaluates, investigates
and performs site characterizations, underground
tank removals, contaminated and hazardous
waste removal actions under the direction of
regulatory agencies.

Suenram and Associates, Inc. (S&A) DBE, SBE
Responsibilities: Utility Support
Address and Telephone Number: 445 South
Figueroa Street, 31st Floor, Los Angeles, CA 90071 |
213.297.7050
Founded in 2018, S&A is a professional
services firm that provides civil engineering
design and consulting services on public works
infrastructure projects. They specialize in utility
engineering management and utility owner/thirdparty coordination with support on a variety of transportation and civil projects, including commuter
and light-rail projects, heavy rail, highway and
bridge infrastructure.

Tatsumi and Partners, Inc. (T&P) DBE, SBE
Responsibilities: Landscape Design Support
Address and Telephone Number: 49 Discovery,
Suite 120, Irvine, CA 92618 | 949.453.9901
Founded in 1985, T&P provides expertise in
aesthetics, design, irrigation design, irrigation system analysis, public outreach, liability risk management,
and water management. They have provided
unsurpassed service and the highest quality design
solutions addressing the unique requirements of
public works agencies such as Caltrans, LA Metro,
County of Los Angeles, and a variety of cities.

V&A, Inc. (V&A) DBE, SBE
Responsibilities: Civil Design Support
Address and Telephone Number: 1111 South
Grand Avenue, Suite 103, Los Angeles, CA 90015,
213.972.9700
Founded in 2018, V&A provides a team of civil and
traffic engineers that have experience in delivering
engineering design services for various cities
and transportation entities in Southern California.

Services include roadway and site planning
and design, bicycle trail design, water system
design, traffic signal design, street lighting design,
preliminary engineering, and design support during
construction. V&A maintains an excellent knowledge
of local standards which allows them to adapt to
varied tasks.
16 Table D.1: Sub-Consultant References
Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
AMH
LA Metro
Sangjun Lee, PE
Director, Engineering
One Gateway Plaza
Los Angeles, CA 90012
213.364.0354
Link US Project | Los Angeles, CA
Description: The purpose of Link US is to increase the overall capacity of Los Angeles Union Station and prepare Southern California for the expected future growth of both Regional Rail (commuter rail and intercity rail) and the California High-Speed Rail Blended System.

Link US has been identified as the No. 1 needed regional rail project in Southern California.

POLB
Clint Herrera, PE, MPA
Assistant Director of
Engineering Design
415 West Ocean Boulevard
Long Beach, CA 90802
626.384.0945
Pier B On-Dock Rail Support Facility | Long Beach, CA
Description: POLB is modernizing its On-Dock Rail Support Facility infrastructure to reap more of the sustainable benefits of shipping goods by rail rather than by truck.

LAWA
Bill Perente, PE
Project Contract Manager
7301 World Way West, 9th Floor
Los Angeles, CA 90045
949.420.5008
APM Landside Access Modernization Program | Los Angeles, CA Description: This project is a design-build contract to implement an APM system for LAWA. The goal of this modernization program is to provide quick, reliable access to terminals, the Metro rail station, and rental car sites for passengers and users at Los Angeles International Airport (LAX).

ARE
LA Metro
Jenny Cristales-Cevallos
Senior Manager,
Transportation Planning
One Gateway Plaza
Los Angeles, CA 90012
213.418.3026
Eastside Transit Corridor Phase 2 | Los Angeles County, CA Description: The project is an approximate 9-mile extension of the Metro E Line farther east from its current terminus at Pomona Boulevard and Atlantic Boulevard in East Los Angeles.

City of Pico Rivera
Javier Hernandez
Director of Innovation and
Communication
6615 Passons Boulevard
Pico Rivera, CA 90660
562.801.4395
Telegraph Road Over San Gabriel River Bridge Replacement | Pico Rivera, CA
Description: The purpose of the project is to replace and widen the bridge by adding a travel lane in each direction to reduce existing and future congestion from I-605.

LACDPW
Martin Reyes, PE, AICP
Transportation Deputy (former
Project Manager for LACDPW)
4801 East Third Street
Los Angeles, CA 90022
323.881.4601
Rosemead Boulevard Complete Streets Improvements Phase 1 | South El Monte and Pico Rivera, CA
Description: The project is a complete streets treatment on a 2.6- mile segment of Rosemead Boulevard. It is a six-lane divided highway with no bicycle facilities and isolated sidewalk segments on the overcrossing for SR-60.
17 City of Pico Rivera, On-Call Engineering Services
D. Consultants and/or Sub-Consultants
Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
GAI
City of San Dimas
Shari Garwick
Public Works Director
245 East Bonita Avenue
San Dimas, CA 91773
909.394.6240
Pavement Distress within the San Dimas Loop | San Dimas, CA Description: The project involved the design of the geotechnical repair for the San Dimas Loop. The San Dimas Loop within the area of concern is bounded by ascending and descending slopes on both sides.

East Bonita Avenue Pavement Rehabilitation | San Dimas, CA Description: The project involved the pavement rehabilitation of Bonita Avenue between San Dimas Avenue and the eastern City of San Dimas limits approximately 600 feet east of San Dimas Canyon Road.

City of Burbank
Artin Megerdichian
Principal Civil Engineer
150 North Third Street
Burbank, CA 91502
818.238.3942
Burbank Channel Bikeway Project | Burbank, CA
Description: The project included the construction of a new sidewalk and boardwalk, installation of piles where the boardwalk is elevated above the ground surface, installation of modular walls and various culverts, ramps lighting and restriping for the site.

City of La Canada Flintridge
Maged El-Rabaa, PE
City Engineer
1327 Foothill Boulevard
La Canada Flintridge, CA 91011
818.790-8882, ext. 205
Rockfall Stability Between YMCA and Joanne’s Sewing Store | La Canada Flintridge, CA
Description: The project involved the mitigation and stability of the rockfall, which exhibited multiple open fractures with two joint sets, and numerous loose rocks on the face of the rockfall area, which were in danger of falling.

Pavement Failure at 4910 Hampstead Road | La Canada
Flintridge, CA
Description: The purpose of the project was to evaluate the surficial stability of the cut-fill slope, repair and stabilize the slope, if warranted, and repair the distressed pavement along Hampstead Road.

GPA
City of Camarillo, Department
of Public Works
Thang Tran
Associate Engineer
601 Carmen Drive
Camarillo, CA 93010
805.388.5345
Central Avenue Bike Lane | Camarillo, CA
Description: The project aims to make the City of Camarillo safer and more accessible for bicyclists. New bicycle lanes, each about 1,700 feet long, are expected be constructed on both the northeast and southwest sides of Central Avenue, beginning near the US-101 interchange and continuing northwest to the City of Camarillo limits.

Table D.1: Sub-Consultant References (Continued)
18 Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
Caltrans District 8
Aaron Burton
Senior Environmental
Planner, Local Assistance -
Environmental Support
464 West Fourth Street, 6th
Floor, MS 760
San Bernardino, CA 92401
909.383.2841
Nuevo Road Bridge | Riverside County, CA
Description: The Riverside County Transportation Department proposes to rehabilitate and widen Nuevo Road Bridge over San Jacinto River. The bridge, built in 1956, is functionally obsolete in accordance with Caltrans Structure Maintenance and Investigations’ Bridge Inspection Report.

City of Sacramento
Stephanie Saiz
Assistant Civil Engineer,
Department of Public Works
915 I Street, 2nd Floor
Sacramento, CA 95814
916.808.6808
Valley Hi Drive/La Mancha Way Project | Sacramento, CA
Description: The project will enhance safety of the roadway segment of Valley Hi Drive and La Mancha Way bounded to the south by Bruceville Road and to the north by Creek Centre Court. The project consists of installing a new traffic signal and pedestrian crossing, curb extensions, and pedestrian median fencing, and extending the raised medians.

GSI
LACDPW
Jennifer Lung
Project Manager
900 South Fremont Avenue
Alhambra, CA 91803
626.300.2349
On-Call Mapping and Survey Services | Los Angeles County, CA Description: The on-call included providing mapping and surveying services for the construction, repair, and demolition of capital projects throughout Los Angeles County.

Irvine Ranch Water District
Joe McGhee, PE
Senior Engineer
15600 Sand Canyon Avenue
Irvine, CA 92618
949.453.5542
On-Call Land Surveying Services | Irvine, CA
Description: The on-call included providing land surveying, mapping, and right-of-way engineering on numerous improvement projects.

South Coast Water District
Taryn Kjolsing, PE
Engineering Manager
31592 West Street
Laguna Beach, CA 92651
949.499.4555, ext. 3171
On-Call Land Surveying Services | Laguna Beach, CA
Description: The on-call included providing mapping and surveying services for infrastructure sewer and water pipelines, pump stations, reservoirs, and other facility improvements.

Table D.1: Sub-Consultant References (Continued)
19 City of Pico Rivera, On-Call Engineering Services
D. Consultants and/or Sub-Consultants
Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
KES
Metro Gold Line Foothill
Extension Construction
Authority
Chris Burner
Chief Project Officer
406 Huntington Drive, Suite 202
Monrovia, CA 91016
626.305.7003
Metro Gold Line Foothill Extension Phase 2A | Pasadena to Azusa, CA
Description: Phase 2A of the project includes the design and construction of 11.5 miles of double light rail main track in Los Angeles County with 15 elevated guideway bridges, six stations, 14 at-grade rail crossings, and a 24-acre maintenance and operations facility.

Metro Gold Line Foothill Extension Phase 2B | Azusa to Pomona, CA
Description: Phase 2B of the project includes a 12.3-mile light rail from Glendora to Montclair and will connect regional destinations, including two dozen colleges and universities within a short walk, bicycle or bus ride from one of the future stations.

LA Metro
Julio Perucho
Director, Program Management
One Gateway Plaza
Los Angeles, CA 90012
213.922.4387
City of Lynwood Intersection Improvements | Lynwood, CA Description: LA Metro, in cooperation with the City of Lynwood, is proposing improvements to Imperial Highway between State Street and Wright Road in the City of Lynwood.

City of Compton Intersection Improvements | Compton, CA Description: LA Metro, in cooperation with the City of Compton and the County of Los Angeles, is proposing improvements to the Rosecrans Avenue/Atlantic Avenue and Artesia Boulevard/Santa Fe Avenue intersections.

LA Metro
Robert Machuca
Program Manager
One Gateway Plaza
Los Angeles, CA 90012
213.922.2000
SR-57/SR-60 Interchange Improvement Project PS&E | Los
Angeles County, CA
Description: The project consists of 2.5 miles of freeway improvement on the merged section of SR-60 and SR-57 through the Cities of Diamond Bar and Industry.

S&A
LA Metro
Michael Harrington
DEO, Director of Project
Engineering
One Gateway Plaza
Los Angeles, CA 90012
213.893.7163
Regional Connector Transit Corridor | Los Angeles, CA
Description: 1.9 miles of new track was laid as part of this project and will allow light rail trains to travel between Union Station and the busy 7th Street/Metro Center Station in Downtown’s Financial District.

Table D.1: Sub-Consultant References (Continued)
20 Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
LA Metro
Eduardo Cervantes
Senior Executive Officer,
Office of Strategic Innovation
One Gateway Plaza
Los Angeles, CA 90012
213.922.7255
LA Metro
Dan Estrada
Deputy Executive Office
One Gateway Plaza
Los Angeles, CA 90012
[email protected]
213.893.7130
Regional Connector Transit Corridor | Los Angeles, CA
Description: 1.9 miles of new track was laid as part of this project and will allow light rail trains to travel between Union Station and the busy 7th Street/Metro Center Station in Downtown’s Financial District.

East San Fernando Valley Transit Project | Los Angeles, CA Description: The project ill improve connections and access to crucial destinations while connecting transit users to the growing network in the San Fernando Valley.

T&P
LACDPW
Jim Bazinet
Landscape Architect
Architectural Engineering
Division
900 South Fremont Avenue
Alhambra, CA 91803
626.300.3218
On-Call | Los Angeles County, CA
Description: The on-call included various types of projects related to transportation and “green” streets. Specific TO projects included the designs for Altadena Monument Signs, Puente Creek Greenway screening landscape, Burton Chase Park, and Workman Mill Road bikeway landscape.

LA Metro
Ernesto Chaves
Project Manager
One Gateway Plaza
Los Angeles, CA 90012
213.547.4362
I-710 Corridor EIR/EIS | Los Angeles County, CA
Description: The project included a Visual Impact Assessment (VIA).

Over 50 key points along the 18-mile project site were identified and assessed for value to the VIA - 31 key points were selected for inclusion in the VIA.

Caltrans District 8
Miriam Bishop
Landscape Architect
464 West Fourth Street, 10th
Floor
San Bernardino, CA 92401
213.598.5220
I-15/I-215 Devore Interchange Improvements | Devore, CA Description: The project improvements included the addition of one northbound lane and one southbound lane on I-15 between I-215 and Glen Helen Parkway.

Table D.1: Sub-Consultant References (Continued)
21 City of Pico Rivera, On-Call Engineering Services
D. Consultants and/or Sub-Consultants
Client, Contact, Title, Address,
Telephone Number
Description of Projects Completed and Location
V&A
LADOT
Ricardo Rivera
Transportation Engineer – LA
Metro Programs Division
100 South Main Street
Los Angeles, CA 90012
213.928.9680
K-Line (Crenshaw/LAX) Transit Corridor Project | Los Angeles, CA
Description: The project will connect the Expo Line via the Crenshaw Corridor through Inglewood to the C (formerly Green) Line near LAX.

This 8.5-mile light rail expansion is a key expansion of the Metro rail system.

LABOE
Ignacio Villa
Civil Engineering Associate
IV – Bridge Improvement
Division
1149 South Broadway, Suite 750
Los Angeles, CA 90015
213.485.4942
Riverside Bridge Roundabout | Los Angeles, CA
Description: The project consisted of the replacement of the old bridge as well as multiple street and traffic improvements, including the City of Los Angeles’ first modern traffic roundabout. The two lane roundabout on the east side of the bridge was designed to move traffic through the circle in a faster and safer configuration than a traffic light.

LABOE
Curtis Tran
Senior Civil Engineer - LA
Metro Transit Division
1149 South Broadway, 6th Floor
Los Angeles, CA 90015
213.485.4504
I-405 Sepulveda Pass Improvements Project | Los Angeles, CA Description: The project added a 10-mile HOV lane and improved supporting infrastructure such as ramps, bridges, and sound walls.

The segment of the I-405 between the I-10 and US-101 freeways was widened.

Table D.1: Sub-Consultant References (Continued)
22 E. Work Approach
E. Work Approach
A. Project Management
Project management will include coordinating
and being responsible for scheduling meetings,
managing the project schedule, preparing and
distributing minutes, field reviews, tracking action
items for the City and consultant sub-consultants,
and, for federally funded projects, preparing
submissions for the City to submit to Caltrans
Local Assistance.

HDR will develop a Project Management Plan
(PMP) for this contract, similar to those that we have
implemented for the successful project delivery for
our local municipal clients.

As seen as Figure E.1, the PMP will guide our
overall project management, will be scalable, and
can be customized to the specific needs and size
of each TO or project. HDR’s PMP will emphasize
project communication procedures, delivery of
the required services, the submittal process and
securing approvals. The PMP incorporates the four
following key elements:

1. Operations Plan. The Operations Plan will
assign the appropriate staff and verify that they have
a clear direction, well-defined deliverables, and fully understand the scope, process, schedule, budget,
and priorities. Project document control and subconsultant management guidelines will be defined.

2. Communication Plan. The Communication
Plan will establish the communication protocol to
verify that project concerns, issues, and directions
will be handled promptly and effectively. The
Communication Plan will include team member
contact information and communication procedures,
including guidelines for email, distribution
lists, document forms and templates, and a
communication protocol matrix.

It will be distributed to the entire team and defines
the roles and responsibilities of each team member.

3. Quality Management Plan (QMP). The QMP
will define the procedures and requirements for
the project deliverables to meet HDR, City, and
local agencies’ (if applicable) standards. Once the
schedule is approved, the QMP will list mandatory
management reviews, deliverable reviews,
and interdisciplinary reviews, with dates and
identified reviewers.

4. Production Plan. The Production Plan will outline
each team member’s responsibilities, procedures for
initiating and advancing the work, and timing of the
preparation of deliverables. Design criteria and CAD
standards will be defined.

Figure E.1: HDR’s Proven PMP
23 E. WORK APPROACH
City of Pico Rivera, On-Call Engineering Services
E. Work Approach
B. Community Outreach
Community outreach will include attending and
providing support and materials for City and/or City
Council presentations and community outreach
meetings, including but not limited to, PowerPoint
presentations, project fact sheets, concept
renderings, GIS storymaps, plans and drawings
and answering questions from the public and/or
committee or council members. Graphic visuals shall
be prepared for both print and digital applications.

Outreach efforts will be closely coordinated and
based on direction from City staff. Once it is
determined that a study and/or a design effort
requires public input, the HDR Team will offer
specific recommendations on the methods and
timing as well as the types of support material to be
used. We will collaborate with the City on identifying
stakeholders and the most effective outreach
methods. Outreach efforts can range from in-person
community meetings, virtual meetings, or web-based
community input to material that is direct mailed.

The HDR Team is also prepared to support City staff
with community communications during construction
with roadway advisories and pre-construction
community information events.

C. Preliminary Engineering and
Planning Studies
Upon the decision of the City to initiate studies
to determine the feasibility of a project, the HDR
Team will work with City staff to establish a scope
to provide the City, community, and City Council the
information needed to make decisions to pursue the
project further, make modifications, or potentially
take a different approach. These initial studies could
include Feasibility Studies, Preliminary Project
Reports, environmental screening, geometrics,
right-of-way impacts, traffic impact analyses, cost
estimating, energy savings, sustainability reviews,
safety reviews, compliance with the goals of the
mobility element of the City’s General Plan, and
compatibility with regional plans. Under preliminary
engineering and planning studies, plan development
can reach the 30 percent conceptual level and result
in the initiation of required environmental studies.

D. Surveys, Mapping, and Field
Reviews
HDR is prepared to provide requested survey
services, including preparing base mapping for
roadway projects, property boundary surveys,
alta surveys, and of right-of-way maps; setting or
re-establishing survey monuments; establishing
elevation monuments; and checking grades during
construction. The scope of comprehensive base
mapping and surveying will include Control Surveys,
Topographic Surveys, Monument Establishment,
Aerial Photogrammetry, Right-of-Way Retracement,
and a Record of Survey. Formal surveying shall
be conducted in accordance with the Professional
Land Surveyors’ Act and California Business and
Professions Code. Survey work will also include
review of record drawings and field verification.

As part of the LACDPW LA County Proposition
218 Outreach Support Project, our Community
Outreach Task Lead, JC Erickson, is supporting
the Sewer Maintenance Division with community
outreach aimed at raising public awareness of the
needs and benefits associated with the proposed
increase in the annual sewer service charge.

HDR Relevant Project Experience
24 E. Environmental Studies and
Documentation
The HDR Team can assist with the type of
environmental documentation and supporting studies
that are required for the City’s projects. HDR can
prepare documentation from exemption to full EIRs
and can do so for both compliance with CEQA and
NEPA depending on the dedicated funding sources
for the project. The environmental analyses will
also include the application for required regulatory
permits such as NPDES, CWA Section 401
certification, as well as encroachment permits from
agencies such as Caltrans and the County of Los
Angeles. For NEPA documents, HDR will assist in
obtaining the appropriate federal agency approvals,
or when delegated to the state, from Caltrans.

F. Utility Research and
Coordination
Most roadway projects will impact, in some manner,
both existing overhead and underground utilities as
well as proposed additions or upgrades of those
facilities. The HDR Team will assist the City in
determining the location and potential impacts to
utilities within the project limits, including gravity
systems such as sewer and storm drains. This work
will include requesting and reviewing utility maps,
preparing utility base sheets, creating a utility matrix, and verifying utility locations in the field. Once
impacts are determined, the HDR Team will assist
the City in the coordination with the affected utility
companies and/or public agencies responsible for
the modification or relocation of those facilities.

G. Right-of-Way Phase and
Determination
The HDR Team will assist the City on projects
determined to require the acquisition of right-ofway by providing appraisal services and property assessments, preparing offers to purchase, and
coordinating escrow documents and recordation. In
addition, HDR is prepared to provide documentation
required for eminent domain proceedings and filings.

Acquisitions can include temporary construction
easements, right of entries, permanent easements,
and partial and full acquisitions, including relocation assistance (if required by law). If the project
is federally funded, the required right-of-way
certifications in accordance with Caltrans Local
Assistance Procedures Manual will be prepared and
submitted for approval.

H. Design
Upon the City’s determination to proceed with
a project, the HDR Team will assist the City in
completing necessary plans, specifications, and
estimates for the project. These services may
include, but not be limited to, geotechnical, roadway,
geometrics, traffic signal design, striping, signage,
drainage and sewer facilities, lighting, landscaping,
city buildings, bridges, water, sewer, storm drain
systems, transit facilities, bikeways, and ADA
improvements. Plans and specifications will be made
As part of the LA Metro SR-57/SR-60
Interchange Improvement Project PS&E, our
Utility Research and Coordination Task Lead,
John Ballas, coordinated utility permits from six
governmental agencies and six utility companies
while maintaining project schedule.

HDR Relevant Project Experience
25 City of Pico Rivera, On-Call Engineering Services
E. Work Approach
to City standards and requirements (i.e. Greenbook,
AutoCAD standard plans, and specifications), or if
under another agency’s jurisdiction, will be to those
standards. Detailed cost estimates will be prepared
at each phase of design (30 percent, 65 percent, 95
percent, and 100 percent). Design efforts will include
the application for, and the processing of, required
regulatory/encroachment permits which will be made
a part of the project specifications.

I. Construction Phase
Authorization
Most federal grants, as well as some state and
regional grants, will require the City to apply for
Request for Authorization to proceed to construction.

For federally funded projects, this will require
obtaining approval of an E-76 form, that in turn
may require right-of-way certifications, utility
certifications, agency cooperative agreements, as
well as environmental clearance documentation.

When cities, familiarity with these forms and
requirements is limited, the HDR Team can assist in
completing these approval requests and supporting
documentation which we achieve on a regular
basis. The HDR Team is prepared to assist the City
in preparation of these documents for submittal,
including working with the Caltrans Local Assistance
Office, if necessary, and verifying that project
documentation is in order for subsequent audits.

J. Bid Support Services
Under bid support services, HDR will provide
an electronic copy of the final approved plans
and specifications (plans in both AutoCAD and
PDF formats; specifications in both MS Word
and PDF formats) and a hard copy of the final
approved specifications.

Upon the City’s release of the solicitation for bids
for a project, the HDR Team will assist the City
in responding to bid document inquires, prepare
addendums as needed, review bids upon receipt,
assist with responses to protests, and also assist
with processing the award documentation.

K. Construction Support
Services
During construction, the HDR Team will assist
the City, as necessary, with responding to RFIs,
reviewing submittals and shop drawings, reviewing
construction claims, providing inspection and
construction management services, and providing
recommendations and support for unforeseen
conditions during construction. Services will also
include attending pre-construction meetings,
construction progress meetings, and field meetings.

Upon project completion, the City will be provided
as-built final plans that includes AutoCAD files with
necessary revision notations.

L. Grant Administration
The HDR Team is prepared to assist the City in
researching grant opportunities, assessing grant
criteria fit to the various projects or studies the City is pursuing, preparing grant applications and support
material, assisting staff in obtaining agency support
letters, following up on inquiries from the grantors,
and assisting with Award Package and Final Report
As part of the reevaluation of the Environmental
Document for the LA Metro Whittier Boulevard
Intersection Improvements PS&E, HDR
performed a QC review of the traffic analysis
methodology and determined that widening for the
proposed right turning lanes at both intersection
improvements were not necessary. We saved the
City of Whittier additional cost for construction and
eliminated the need for permanent acquisitions
due to the proposed widening.

HDR Relevant Project Experience
26 of Expenditures. Once the City has been awarded
grant funding, the HDR Team will assist the City in
preparing required Authorizations to Proceed (E-76)
for phases and assist with preparation of invoices for
grant reimbursements.

M. Prior Rights Expertise
After the determination that a utility relocation will
be necessary, the City must determine who will be
responsible for the costs of the relocation. This will
be dependent on where the utility is located, when
it was installed, and the franchise agreements it is
operating under. The HDR Team will assist the City
in reviewing the applicable franchise agreements,
applicable state statutes, easements descriptions,
and utility plans to determine cost allocations.

HDR will provide and coordinate research of prior
rights. We will coordinate and track requests and
receipt of prior rights from third-parties as part of
an iterative process. A Report of Investigation (ROI)
will be prepared that will include a review by the City Attorney’s Office to validate prior rights. The HDR
Team will also represent the City at meetings with
utilities regarding the determination of prior rights
and cost allocations.

HDR will serve as the single focal point for utility
issues in relation to prior rights and the nature of
replacements rights that result. In addition, HDR will
provide the City with a detailed utility matrix and log.

Our Work Approach Philosophy
The HDR Team is collectively committed to
achieving client satisfaction and providing an
exceptional level of experience and successful
project delivery. We have the depth of expertise and
resources to be flexible and responsive, and we
recognize the importance of schedule and budget
constraints, as well as the requirements for quality.

Mark and our Task Leads will meet with the City
Project Manager and the Project Development
Team (PDT) to discuss aspects of the task, goals,
objectives and expectations. He will then prepare a
PMP with a Work Plan that includes a well-defined
scope of work, staffing plan, schedule, and budget
for the City Project Manager’s review and approval.

Following City approval, HDR will commence work
by implementing our proven work plan systems and
procedures in accordance with the contract.

As part of the City of Beverly Hills Department
of Public Works North Portal Rebuilding
American Infrastructure with Sustainability
and Equity (RAISE) Grant Application, our
Grant Administration Task Lead, Robert Yates,
implemented the grant development schedule,
narrative outline, reviews in coordination with
City of Beverly Hills staff, and the delivery of the
application and supporting materials for input into
the RAISE Grants website.

HDR Relevant Project Experience
Norwalk Boulevard and Slauson Avenue Traffic
and Pavement Improvements - HDR is preparing
traffic control plans and signing and striping
plans for the roadway pavement reconstruction
work under design by LACDPW staff.
27 City of Pico Rivera, On-Call Engineering Services
E. Work Approach
PCH Mobility Improvement Project PA&ED -
HDR is assisting the City of Hermosa Beach
with addressing pedestrian safety and corridor
aesthetics while implementing traffic-calming and
overall mobility improvements.

The approach for each TO will follow HDR’s wellestablished procedures for similar projects that we have completed. The HDR Team is well versed in
the applicable codes, guidelines, and regulations
applicable to the Scope of Services that may be
needed by the City. Our practice of obtaining early
involvement from stakeholders and identifying
opportunities for cost savings will be of significant
benefit to the City.

The HDR Team will collaborate with the City
Project Manager and engage stakeholders to be
involved in the project development. We will be
effectively engaged to work closely with City staff
and stakeholders to understand and meet project
objectives and expectations.

The HDR Team will:
• anticipate and proactively manage challenges
• control costs, providing efficient and
cost-effective services
• produce quality deliverables and minimize the
amount of rework
• complete the project on schedule and within
budget with the highest level of quality
28 F. Client References
F. Client References
29 F. CLIENT REFERENCES
City of Pico Rivera, On-Call Engineering Services
F. Client References
HDR References
We pride ourselves on providing a quality product that exceeds our clients’ expectations. As evidenced by our client references shown Table F.1 below, HDR has an impressive track record of adhering to budget and schedules to produce successful project delivery.

Table F.1: HDR References
Client Name, Contact
Name, Title, Address,
Phone Number
Description of Projects Completed and Location
City of Pico Rivera
Javier Hernandez
Director of Innovation
and Communication
6615 Passons Boulevard
Pico Rivera, CA 90660
562.801.4395
Rosemead-Lakewood Boulevard BRT | Los Angeles County, CA Description: The City contracted with HDR to assist with evaluating the potential for a transit hub within their jurisdiction that would include relocation of the existing Metrolink station from Commerce to Pico Rivera, the establishment of a BRT along the adjacent north-south Lakewood-Rosemead Boulevard corridor from Long Beach to Pasadena, and the incorporation of the proposed Metro E Line Station at Washington Boulevard on this corridor.

LA Metro
Julio Perucho
Director, Program
Management
One Gateway Plaza
Los Angeles, CA 90012
213.922.4387
On-Call Highway Program Project Delivery Support Services | Los Angeles County, CA
Description: Since 2020, HDR has been providing roadway, structure, and drainage engineering services. Completed TOs include, but are not limited to, Whittier Boulevard Intersection Improvements PS&E, City of Compton Intersection Improvements PA&ED, and City of Lynwood Imperial Highway Corridor Capacity Enhancements PA&ED and PS&E.

City of Compton, Public
Works Department
John Strickland Jr.

Project Manager
205 South Willowbrook
Avenue
Compton, CA 90220
310.605.5505
City of Compton Intersection Improvements PA&ED | City of Compton, CA
Description: The project proposed implementing focused congestion mitigation measures with intersection improvements at Rosecrans Avenue/ Atlantic Avenue and Artesia Boulevard/Santa Fe Avenue, providing congestion relief during peak hours. HDR delivered environmental approval and 35 percent engineering for proposed improvements
LACDPW
Maria Sim
Civil Engineer
900 South Fremont
Avenue
Alhambra, CA 91803
626.458.5956
As-Needed Engineering Design and Support Services for the Road/ Flood Control Construction | Los Angeles County, CA
Description: In 2018, HDR was selected by LACDPW to provide asneeded engineering and design support services on various federally and non-federally funded projects. Completed TOs include, but not limited to, Los Angeles River Bike Path, Soledad Canyon Bridge over the Santa Clara River, and Norwalk Boulevard and Slauson Avenue Traffic and Pavement Improvements.

G. Rights to Materials
G. Rights to Materials
30 G. RIGHTS TO MATERIALS
City of Pico Rivera, On-Call Engineering Services
G. Rights to Materials
All responses, inquiries, and correspondence relating to this RFP and all reports, charts, displays, schedules, exhibits, and other documentation produced by HDR that are submitted as part of the proposal and not withdrawn shall, upon receipt by City, become property of City.

Additional Attachments
Additional Attachments
H. Schedule of Hourly Rates
RATES-01
H. SCHEDULE OF HOURLY RATES
City of Pico Rivera, On-Call Engineering Services
H. Schedule of Hourly Rates
Prevailing Wage assignments will be charged based on the State of California Department of Industrial Relations (DIR). For Scope of Services subject to Prevailing Wage, the hourly pay, including overtime; weekend; holiday; travel and subsistence; and shift provisions is to follow DIR Prevailing Wage. Please refer to the DIR website: https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html

Page 1 of 4 ends

02/14/2024

SCHEDULE OF HOURLY RATES FOR CITY OF PICO RIVERA ON-CALL ENGINEERING SERVICES Prime Firm: HDR Engineering, Inc.

Subconsultant Firm: ---
Classification Hourly Rate
Principal-in-Charge $477.00
Senior Project Manager $460.00
Sr. Technical Advisor $438.00
Project Manager $405.00
Technical Advisor $466.00
Sr. Task Manager $412.00
Sr. Task Manager - Structures $392.00
Sr. Task Manager - Traffic $399.00
Task Manager $355.00
Senior Engineer $318.00
CADD/BIM Task Lead $318.00
Sr. Project Administrator $318.00
Quality Manager $305.00
Sr. Task Lead $286.00
Sr. Task Lead - Environmental $308.00
Sr. Traffic Engineer $298.00
Environmental III $251.00
Sr. Project Engineer/Planner/ Architect/ Geotech $251.00 Engineer III $239.00
CADD/BIM Specialist III $234.00
Traffic Engineer III $227.00
Environmental II $217.00
Project Engineer/ Planner/ Architect/ Geotech $212.00
Sr Project Accountant $198.00
Sr. Landscape Architect $210.00
CADD/BIM Specialist II $186.00
Task Lead $180.00
Engineer II $177.00
Traffic Engineer II $176.00
CADD/BIM Specialist I $167.00
Environmental I $154.00
Designer $151.00
Project Accountant $148.00
Traffic Engineer I $151.00
Engineer I $135.00
Project Administrator II $118.00
Project Administrator I $101.00
RATES-02

Page 2 of 4 ends

Subconsultant Firm: Amheart Solutions
Classification Hourly Rate
Civil Designer I $101.84
Civil Designer II $113.15
Civil Designer III $124.47
Civil Engineer I $135.78
Civil Engineer II $147.10
Subconsultant Firm: Arellano Associates, LLC
Classification Hourly Rate
Project Manager $221.03
Deputy Project Manager $179.06
Creative Lead $179.06
Senior Project Coordinator $151.08
Media Lead $151.08
Project Coordinator $109.11
Creative Coordinator $109.11
Assistant Project Coordinator $78.34
Subconsultant Firm: Geo-Advantec, Inc.

Classification Hourly Rate
Principal Geotechnical Engineer $250.00
Principal Engineering Geologist $250.00
Senior Project Engineer $200.00
Staff Engineer $150.00
GIS Technician $150.00
Laboratory Manager $125.00
Drafter/CAD Technician $90.00
Senior Engineer/Registered Geotechnical
Engineer
$200.00
Senior Field Engineer/Field Operation Manager $150.00
Senior Lab Technician $110.00
Senior Field Technician $150.00
Subconsultant Firm: GPA Consulting
Classification Hourly Rate
Principal Environmental Planner $363.00
Senior Associate Environmental Planner $289.00
Senior Environmental Planner $210.00
Associate Environmental Planner $142.00
Environmental Planner $116.00
Senior Associate Biologist $247.00
RATES-03
City of Pico Rivera, On-Call Engineering Services
H. Schedule of Hourly Rates

Page 3 of 4 ends

Senior Biologist $200.00
Associate Biologist $142.00
Biologist $116.00
Principal Architectural Historian $331.00
Senior Associate Architectural Historian $221.00
Senior Architectural Historian $184.00
Associate Architectural Historian $147.00
Architectural Historian II $116.00
Architectural Historian I $105.00
Senior GIS Analyst $189.00
Project Coordinator $132.00
Administrative Assistant $84.00
Intern $69.00
Subconsultant Firm: Guida Surveying, Inc.

Classification Hourly Rate
Survey Principal $335.00
Senior Survey Project Manager $300.00
Survey Project Manager $265.00
Senior Project Surveyor $250.00
Project Surveyor $230.00
Senior Survey Analyst $205.00
Survey Analyst $150.00
Survey Technician $155.00
Survey Project Coordinator $155.00
Survey Intern $120.00
1-Person Survey Crew** $270.00
2-Person Survey Crew** $430.00
3-Person Survey Crew** $580.00
**Denotes Classifications subject to prevailing wage
Subconsultant Firm: Kroner Environmental Services, Inc.

Classification Hourly Rate
Senior Level Professional $250.00
Mid Level Professional $195.00
Junior Level Professional $165.00
Technician $135.00
Operating Engineer $145.00
Laborer $125.00
Administrator $100.00
RATES-04

Page 4 of 4 ends

Subconsultant Firm: Suenram and Associates, Inc.

Classification Hourly Rate
Principal Utility Lead $211.26
Utility Task Lead $158.10
Utility Engineer III $117.94
Utility Engineer II $98.95
Utility Engineer I $88.31
Subconsultant Firm: Tatsumi and Partners, Inc.

Classification Hourly Rate
Senior Principal $ 265.00
Senior Associate $ 178.00
Senior Designer $ 151.00
Task Leader $ 127.00
Technical Staff III $ 116.00
Technical Staff II $ 105.00
Technical Staff I $ 79.00
Subconsultant Firm: V&A, Inc.

Classification Hourly Rate
Project Manager $249.60
Senior Project Engineer $212.16
CADD Manager $156.00
I. Non-Collusion Affidavit
AFF-01
I. NON-COLLUSION AFFIDAVIT
City of Pico Rivera, On-Call Engineering Services
I. Non-Collusion Affidavit

APPENDIX C
NON‐COLLUSION AFFIDAVIT
The undersigned declares states and certifies that:

1. This Proposal is not made in the interest of, or on behalf of any undisclosed person, partnership, company, association, organization or corporation. This Proposal is genuine and not collusive or sham.

2. I have not directly or indirectly induced or solicited any other Proposer to put in a false or sham proposal and I have not directly or indirectly colluded, conspired, connived, or agreed with any other Proposer or anyone else to put in sham proposal or to refrain from submitting to this RFP.

3. I have not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price or to fix any overhead, profit or cost element of the proposal price or to secure any advantage against the City of Pico Rivera or of anyone interested in the proposed contract.

4. All statements contained in the Proposal and related documents are true.

5. I have not directly or indirectly submitted the proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay any fee to any person, corporation, partnership, company, association, organization, RFP depository, or to any member or agent thereof to effectuate a collusive or sham proposal.

6. I have not entered into any arrangement or agreement with any City of Pico Rivera public officer in connection with this proposal.

7. I understand collusive bidding is a violation of State and Federal law and can result in fines, prison sentences, and civil damage awards.

Signature of Authorized Representative
Name of Authorized Representative Title of Authorized Representative ,p
Thomas T. Kim Senior Vice President
J. Exceptions or Additions
to Sample Agreement
EXC-01
J. EXCEPTIONS OR ADDITIONS TO SAMPLE

AGREEMENT
HDR would like to further discuss the following modifications to the Sample Professional Services Agreement (Appendix B of the RFP). We look forward to working with the City to incorporate language changes to the PSA, if agreeable.

Page 20 of 36 ends

5. CONSULTANT’S SERVICES

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City accordance with the requirements of this Agreement.

6. COMPENSATION

6.3 Fees for such additional services shall be paid within sixty (60) thirty (30) days of the date Consultant issues an invoice to City for such services.

Page 21 of 36 ends

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. However, any modification or reuse of the written products for purposes other than those intended by this Agreement shall be at City’s sole risk and without liability to Consultant.

Page 22 of 36 ends

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials,employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. that are subject to Consultant’s indemnification obligations in this Section 15.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property to the extent resulting from or arising out of any alleged intentional misconduct, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.5 In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, City of Pico Rivera, On-Call Engineering Services
J. Exceptions or Additions to Sample Agreement
EXC-02
elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property to the extent resulting from or arising out of any alleged intentional misconduct, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

Page 25 of 36 ends

16. INSURANCE

16.7 All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced materially changed except on thirty days’ prior written notice to City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or selfinsured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

Consultant shall be entitled to rely upon such documents and information, provided that Consultant will provide City prompt written notice of any known defects in such documents and information.

Page 26 of 36 ends

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant, provided that City will not terminate for cause without providing Consultant written notice of the breach and a period of ten (10) days to cure. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination. Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, provided in accordance with the requirements of this Agreement, prior to the effective date of termination.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, provided in accordance with the requirements of this Agreement, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

Page 28 of 36 ends

27. NON-WAIVER

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole reasonable judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

K. Resumes
Mark Christoffels, PE, PLS
Project Manager; A. Management Task Lead; D. Surveys,
Mapping, and Field Reviews Task Lead
RES-01
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
MBA, Business
Administration
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 40599
PLS, CA 6324

YEARS OF

EXPERIENCE
38 YEARS WITH FIRM
3 Mark has over 38 years of experience managing capital improvement programs and projects primarily as the City Engineer and Public Works Director for several cities in both Los Angeles and Orange Counties, including 11 years as City Engineer for the City of Long Beach. More recently, he served as SGVCOG’s Chief Engineer responsible for the establishment of the subregional funding allocations and project implementation for its 30 member agencies under the Measures W, R, and M Programs. Mark also served 4 years as an appointee to the Policy Advisory Council of LA Metro.

City of Pico Rivera and LA Metro, Rosemead-Lakewood Boulevard BRT, Los Angeles County, CA. Project Manager. Mark is responsible for overall project management, including client meetings, internal coordination, budget, and oversight of deliverables. The City contracted with HDR to assist with evaluating the potential for a transit hub within their jurisdiction that would include relocation of the existing Metrolink station from Commerce to Pico Rivera.

LA Metro, Pacific Coast Highway (PCH) Mobility Improvement Project PA&ED, Hermosa Beach, CA. Task Manager. Mark is the Task Manager responsible for overseeing the development of a Purpose and Need Statement and environmental and traffic studies for the project. The project seeks to improve mobility and pedestrian safety on PCH through the City of Hermosa Beach.

City of Long Beach, Second Street Bike Sharrow, Long Beach, CA.

City Engineer. Mark was responsible for overall project management, including funding, final design approval, environmental clearance, and permits. The project designed and constructed Southern California’s first green sharrow lanes as well as green bicycle boxes. The curb lane on Second Street from Bayshore Drive to Livingston Drive in a commercial district was converted to a joint-use vehicle/bicycle lane to provide a safe avenue for cyclists and preserve curbside parking.

RES-02

MARK CHRISTOFFELS, PE, PLS (CONTINUED)
City of Long Beach, Downtown Cycle Track,
Long Beach, CA. City Engineer. Mark was
responsible for the overall project management,
including funding, final design approval,
environmental clearance, permits, right-of-way
acquisition, utility relocations, and oversight of
construction management. The project included
the design and construction of LA County’s first
cycletrack. The cycletrack occupied the left lane
of a paired couplet of east-west one-way streets
crossing Downtown Long Beach and included
separate bicycle signalization. The cycletrack
was implemented on Broadway and Third Street
from Golden Avenue (immediately east of I-710)
to Alamitos Avenue. The project included the
implementation of a road diet, reducing them from
three car-travel lanes to two.

SGVCOG, San Gabriel Valley Subregional
Mobility Matrix, San Gabriel Valley, CA.

Chief Engineer. Mark was responsible for
overall project management, including funding,
interagency coordination, final study approval, and
implementation. In preparation for a new sales tax
measure in LA County (now known as Measure M),
SGVCOG conducted a subregional mobility matrix
study. The study served as the starting point for LA
Metro’s long-range transportation plan update as
well as the Measure M sales tax ballot measure. The
study covered transportation investment needs from
2015 through 2045 and included significant regional
bicycle path planning and projects throughout the
San Gabriel Valley.

SGVCOG, San Gabriel Valley Vehicle Miles
Travel (VMT) Study and Program, San Gabriel
Valley, CA. Chief Engineer. Mark was responsible
for overall project management, including funding,
interagency coordination, final study approval, and
implementation. To assist member agencies with
complying with Senate Bill (SB) 743 mandates,
SGVCOG worked with 30 member agencies to
analyze existing traffic conditions in the region
to develop a baseline standard that determined
significant CEQA thresholds for future land use
and transportation projects. As part of the process,
a web-based tool was developed to allow various
city staff and developers to determine if a proposed
project would require a full VMT analysis based on
each city’s adopted CEQA criteria. This project was
recently recognized as a finalist project for the
“Sustainable/Environmental Enhancement Program
of the Year Award” at the California Transportation
Foundation’s 32nd Transportation Awards.

Alameda Corridor-East (ACE) Construction
Authority, Jump-Start At-Grade Railroad
Crossing Safety Program, San Gabriel Valley,
CA. Chief Engineer. Mark was responsible for the
overall project management, including funding, final
design approval, environmental clearance, permits,
right-of-way acquisition, utility relocations, and
oversight of construction management, including
project close-out. The ACE Construction Authority of
SGVCOG initiated a grade crossing safety program
called “The Jump-Start Program” to improve the
safety of 39 at-grade rail crossings in the San
Gabriel Valley. Improvements included new traffic
and train signage, striping or re-striping streets,
updated signal preemption, active warning devices,
new pedestrian sidewalks, median concrete barriers,
four-quadrant crossing gates, narrow barrier posts,
and raised traffic dots.

Gene Bougdanos, PE
Principal-in-Charge
RES-03
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
MBA, Business
Administration
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 41533

YEARS OF

EXPERIENCE
40 YEARS WITH FIRM
11 Gene has over 40 years of experience in the planning, design, and construction management of transportation infrastructure projects. He has led and managed the planning and design on a number of large transportation projects. Gene has also managed on-call contracts and TOs with numerous agencies, including LA Metro, POLA, LACDPW, LABOE, and Caltrans. He has expanded his familiarity with the specifications and standards applicable to each of his contracts with these various agencies.

LACDPW, As-Needed Engineering Design and Support Services for the Road/Flood Control Construction, Los Angeles County, CA. Contract/TO Manager. Gene managed two $5M as-needed contracts, including staff assignments and TO scoping with LACDPW.

TO assignments have included extension of staff program management services, guardrail safety improvements, cost estimating, traffic engineering, bridge design, surveying and mapping, and Project Design Concept (PDC) Reports for roadway and bikeway safety and capacity improvements.

LACDPW, Transportation Planning Services, Los Angeles County, CA. Project/TO Manager. Gene led the TO to provide transportation planning services to develop strategies, through organizational changes or operational improvements, to improve LA County project delivery, leverage available funding, and implement Vision Zero principles. Project deliverables included a detailed report that outlined recommendations for process improvements for enhanced project delivery and quality control.

LABOE, Sixth Street Viaduct Replacement, Los Angeles, CA. Civil Engineering Task Lead. Gene was responsible for extensive utility coordination, local roadway and intersection modifications, and stakeholder consensus building. The newly constructed $588M viaduct replaced the iconic structurally deficient Sixth Street Viaduct, connecting Boyle Heights to Downtown Los Angeles.

Los Angeles Department of Transportation (LADOT), I-10/ Robertson/ National Area Circulation Improvement Project, Los Angeles, CA.

Project Manager. Gene was responsible for the overall delivery of a Project Feasibility Study, Project Study Report-Project Development Support (PSR-PDS) and Environmental Document for this freeway RES-04

GENE BOUGDANOS, PE (CONTINUED)
interchange and local circulation improvement
project. This LADOT improvement project included
planning, preliminary engineering and design,
and environmental analyses of a package of
improvements to the I-10/Robertson on- and offramps and arterial streets in the area.

LA Metro, Supplemental Engineering Services
(SES) for Transit/Rail Projects, Los Angeles, CA.

Project Manager. Gene is responsible for managing
a $50M TO-based contract supporting LA Metro’s
transit capital and maintenance programs. Specific
TOs include a grade separation on the Crenshaw/
LAX Transit corridor at the Centinela Avenue/
Florence Avenue grade crossing, early action design
supporting delivery of the 19-mile WSAB Line transit
corridor, and a new replacement parking structure
at the western terminus of the Purple Line Section 3
serving the Los Angeles VA Hospital.

LA Metro, Link US Project, Los Angeles, CA.

QC Reviewer. Gene was responsible for preparing
and reviewing various documents, including HighSpeed Rail Structural Assessment, Gold Line Realignment Feasibility Study, notes to reviewers,
key assumptions and deviations, and Initial Basis of
Design Report. Plan reviews included a 15 percent
design review. HDR is responsible for providing
preliminary engineering, environmental documents,
final design, and construction support.

POLA, I-110/C Street Interchange Improvements,
Los Angeles, CA. Project Manager. Gene was
responsible for resource allocation, scope and
schedule management, cost and budget control,
and aspects of project delivery. The project
reconfigured the northbound off-ramp to directly
access Harry Bridges Boulevard, modified the
northbound on-ramp, realigned Harry Bridges
Boulevard, and combined the I-110 ramp termini/C
Street/Figueroa Street intersection with the John S.

Gibson Boulevard/Harry Bridges Boulevard/Figueroa
Street intersection to minimize traffic congestion
and provide a more direct truck route to the POLA
terminals. The work included preparing the Project
Report/Environmental Document (PR/ED), Storm
Water Data Report (SWDR), fact sheets, and final
PS&E.

ACE Construction Authority, Program
Management Contract, San Gabriel Valley/
Pasadena, CA. Technical Advisor and
Principal-in-Charge. Gene was responsible for
the Joint Venture (JV) Program Management
team implementing a $950M rail and roadway
improvement project in the San Gabriel Valley. Initial
work included development of plans, procedures,
and program documents detailing the value analysis
and quality control/quality assurance guidelines,
design criteria, a right-of-way program, initial
safety improvements at-grade crossings, contract
packaging, scheduling, and community outreach
plans.

RES-05
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
MA, Global Studies
BA, Philosophy,
Religion, and Ethics

YEARS OF

EXPERIENCE
23 YEARS WITH FIRM
1 JC has over 23 years of extensive hands-on experience in community outreach, stakeholder engagement, crisis and multicultural communications, media relations, and international relations. He has worked in the full spectrum of our industry, supporting nonprofits, governments, and corporations, promoting social change through his commitment to improving the quality of life of people.

LACDPW, LA County Proposition 218 Outreach Support, Los Angeles, CA. Strategic Communications Lead. JC is responsible for overseeing the design and execution of communications, stakeholder management, and outreach campaigns to educate and collect meaningful feedback from the community at large. The Los Angeles County Consolidate Sewer Maintenance Division is proposing an increase in the annual sewer service charge. Authorization of the proposed increase depends on voter approval through the Proposition 218 process. HDR will support the Sewer Maintenance Division with community outreach aimed at raising public awareness of the needs and benefits associated with the proposed increase in the annual sewer service charge.

Los Angeles Sanitation and Environment (LASAN), Green Waste Processing Facilities Public Outreach and Technical Services, Los Angeles CA. Strategic Communications Lead. JC is leading the strategic deployment of stakeholder and community engagement efforts to bring community understanding and participation to a transformational project. Through this work LASAN is proposing the addition of green waste composting to an exciting sanitation facility.

Southern California Association of Governments (SCAG), Broadband Program Strategic Services, Southern California. Deputy Project Manager. In this cutting-edge effort, JC is leading the biggest task of this project, providing advisory and operational communications and outreach and stakeholder management support to SCAG as they grow their Broadband Program among isolated and hard-to-reach communities in Southern California. In his role as Deputy Project Manager, JC oversees managing ARE in deploying outreach activities.

JC Erickson
B. Community Outreach Task Lead
RES-06

JC ERICKSON (CONTINUED)
City of Yucaipa, I-10 Wildwood Canyon Road
Interchange PA&ED, Yucaipa, CA. Strategic
Communications Lead. JC is responsible for
engaging the community through in-person and
virtual outreach, media relations, and stakeholder
engagement activities to identify the community’s
preferred alternatives in the design of this highway
improvement project. Public scoping meetings and a
public outreach summary have been used to capture
and communicate the community’s voice to City of
Yucaipa staff, Caltrans, elected officials, and the
community at large.

Southern California Gas (SoCalGas), Community
Engagement Plan for Climate Adaptation
Vulnerability Assessment, Los Angeles, CA.

Strategic Communications Lead. JC is leading
a team across Southern California to design and
help execute a community engagement plan geared
toward disadvantaged communities, in support of
the recent climate change adaptation vulnerability
assessment, ordered by the California Public Utilities
Commission (CPUC) for investor-owned utility
companies. He is currently engaging hundreds
of local community-based organizations and
stakeholder groups in identifying and establishing
efficient public feedback methodologies for
disadvantaged communities to prioritize SoCalGas’
upcoming climate change adaptation investments.

SoCalGas, Customer Affairs Interactive Map,
Statewide CA. Project Manager. JC is responsible
for successfully completing the project, managing
collaborative technical teams, and liaising between
the investor-owned utilities (IOUs), CPUC, and the
HDR GIS team. In April 2022, the CPUC issued
an order instituting rulemaking (OIR) for IOUs to
establish a single statewide database of communitybased organizations at the zip code level. The database, map, and associated sources will be
posted on the Commission Energy Arrearages
website and made accessible to the public. HDR
will work with SoCalGas, Southern California Edison
(SCE), Pacific Gas and Electric, and San Diego Gas
and Electric to host and design a community-based
organizations interactive map to support the case
management pilot program to reduce pandemic
arrearages.

LA Metro, Link US Project - Outreach and
Facilitation Services, Los Angeles, CA. Strategic
Communications Lead. JC and his local team are
supporting the public and stakeholder conversations
needed to align an environmentally secure and
just path for the Link US Project. JC’s experience
proved instrumental in leading this equity-driven
facilitation and engagement effort to create the
needed infrastructure to improve the quality of life
of riders within our community at large focused
on disadvantaged communities. HDR is providing
preliminary engineering, environmental documents,
final design, and construction support for the project.

RES-07
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
BS, Civil Engineering
BA, Urban Planning

REGISTRATIONS
PE, Civil, CA 46808
ENV SP

LEED AP

YEARS OF

EXPERIENCE
31 YEARS WITH FIRM
4 Wayne has over 31 years of extensive planning, civil engineering, and project management experience. His direct experience includes the preparation and review of project planning documents, as well as bid documents for public facilities and infrastructure. His project management experience includes project controls and leading multidisciplinary teams from planning and environmental approvals to PS&E.

City of Culver City, Culver Boulevard Realignment, Culver City, CA.

Project Manager. Wayne was responsible for overseeing the preparation of the Preliminary Design Report and PS&E documents for this complete streets project. The project involved the realignment of Culver Boulevard between Sepulveda Boulevard and Elenda Street, with an enhanced streetscape and a large storm water capture and treatment component.

The new road includes a 58-foot-wide raised landscape median, complete with buffered bicycle and pedestrian paths, ADA improvements, and traffic and pedestrian signal modifications.

LACDPW, Multiple Roadway and Flood Projects, Los Angeles County, CA. Project Manager. Wayne was responsible for budgeting, scheduling, and coordinating with multiple agencies and LA County departments to deliver neighborhood-wide transportation, roadway, and flood control projects. Wayne’s responsibilities included design quality control, permitting, contractor coordination, public outreach, and supervisory district updates.

LABOE, Exposition Line Bikeway, Cheviot Hills, CA. Project Manager.

Wayne was responsible for overseeing the PS&E for this ¾-mile bikeway connection. Wayne led a multidiscipline team of experts through the “design excellence” program at the City of Los Angeles in the development of Class I and Class II bicycle paths. Wayne’s value engineering resulted in reduced retaining structures and innovative drainage solutions for cost savings.

LABOE, Active Transportation Projects (ATP) 2 and 3, Boyle Heights, CA. Project Manager. Wayne was responsible for planning and design development oversight for complete streets in the Boyle Heights Linkage and Art District, based on ATP grants 2 and 3. The goal of these two Caltrans Local Assistance Program-funded projects is to increase mobility Wayne Richardson, PE, ENV SP, LEED AP
C. Preliminary Engineering and Planning Studies Task Lead RES-08

WAYNE RICHARDSON, PE, ENV SP, LEED AP (CONTINUED)
and safety, reduce greenhouse gas, and improve
public health. Wayne supervised the preparation
of the Preliminary Design Reports to improve
pedestrian safety and access to the City of Los
Angeles’ Sixth Street Viaduct and Sixth Street
Park, Arts, and River Connectivity (PARC) Projects,
as well as local community destinations. For ATP
3, the Downtown Los Angeles Arts District will
benefit from pedestrian and cyclist improvements,
including new bicycle lanes, a cycle track, new and
widened sidewalks with curb extensions, new trafficcontrolled intersections, and a new shared street connecting to the Sixth Street Viaduct.

LABOE, Safe Sidewalks LA Program, Los
Angeles, CA. Task Manager. Wayne was
responsible for administering a contract for staff
augmentation in support of the sidewalk repair
program, to comply with a $30M/year mandate to
repair sidewalks and comply with ADA requirements
throughout the City of Los Angeles. Wayne also
supported the EIR for the entire program, including
construction scenarios, identification of impacts, and
technical studies.

City of Cerritos, Hot Spots Intersection
Congestion Management, Cerritos, CA. Principal
and Project Manager. Wayne was responsible for
supervising the PS&E preparation for two arterial
intersection improvements and signal modifications
and managing the geotechnical, survey, landscape,
and right-of-way sub-consultants. The intersections
at Carmenita Road and South Street and Bloomfield
Avenue and Artesia Boulevard are considered
congestion hot spots, and the final design raised
the level of service by widening and adding left-turn
lanes. Wayne was able to redesign the Bloomfield
Avenue roadway realignment to avoid costly utility
relocations and commercial property acquisitions.

LABOE, Potrero Canyon Park Rehabilitation
Project, Los Angeles, CA. Lead Civil
Engineering Advisor and Project Manager.

Wayne was responsible for leading a team of
technical experts in the rehabilitation of the 30-
acre Potrero Canyon Park. The project consisted
of stream reconstruction, storm drain basins, as
well as revegetation and park improvements for the
coastal Pacific Palisades Community Center. The
park improvements include a mile of nature trails, a
½-mile trail to the Temescal Road/PCH intersection,
and a pedestrian bridge over PCH connecting to
Will Rogers State Beach. Wayne’s innovative design
solutions allowed for the elimination of potable
water use in favor of a more sustainable irrigation
source by diversion of storm drain dry weather flows.

Additional responsibilities included leading several
outreach and consensus-building workshops with
stakeholders, resource agencies, and the general
public.

LA Metro, I-710 Preliminary Engineering, Los
Angeles, CA. Deputy Project Manager. Wayne
served as the Deputy Project Manager on behalf
of LA Metro for the bridge APS and the complex
utility relocations in and around the POLB for the
I-710 freeway improvements and freight corridor.

Wayne coordinated with Caltrans, GCCOG, cities,
resource agencies, project partners, and subconsultants regarding utility relocation strategies and agreements. He oversaw the daily project activities,
reviewed consultant progress, and served as the
Quality Control (QC) Manager.

George Gorman
E. Environmental Studies and Documentation Task Lead
RES-09
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
JD, Law
MA, Resources Law
BA, Philosophy and
Psychology

YEARS OF

EXPERIENCE
12 YEARS WITH FIRM
1 George has over 12 years of experience in environmental planning, policy, project management, and regulatory compliance. He manages the preparation of NEPA and CEQA documents and technical studies for numerous federal, state, and local agencies. George is also a licensed attorney in Colorado and Washington, D.C.

Contra Costa Transportation Authority (CCTA), I-680 Northbound Express Lane PA&ED, Contra Costa County, CA. Senior
Environmental Planner. George is responsible with overseeing the preparation of the EIR/EA and preparing the Section 4(f)/6(f) evaluation and VMT Mitigation Memorandum. The project proposes to construct a northbound express lane from Livorna Road to SR-242 and convert an existing northbound High-Occupancy Vehicle (HOV) lane from SR-242 to south of the Benicia-Martinez Bridge Toll Plaza to an express lane. This project is part of the INNOVATE 680 Program.

Bay Area Toll Authority (BATA), Open Road Tolling (ORT) Conversion North Bridges Project, Bay Area, CA. Senior Environmental Planner.

George’s responsibilities included reviewing draft technical studies for the Categorical Exclusion/Categorical Exemption. BATA, in coordination with Caltrans, proposes to convert existing All-Electronic Tolling (AET) systems to ORT systems at the Antioch Bridge, Benicia-Martinez Bridge, and Carquinez Bridge toll plazas.

BATA, ORT Conversion South Bridges Project, Bay Area, CA.

Senior Environmental Planner. George helped prepare the Preliminary Environmental Analysis Report (PEAR) for the project. BATA, in coordination with the Caltrans, proposes to convert existing AET systems to ORT systems at the Dumbarton Bridge and San Mateo-Hayward Bridge toll plazas.

Caltrans, Albion River Bridge Replacement/Rehabilitation Project, Mendocino County, CA. Senior Environmental Planner/Project Manager. George is overseeing the preparation of the Draft EIR/ Environmental Impact Statement (EIS) for the project. Caltrans, in cooperation with the Federal Highway Administration (FHWA), is initiating an EIR/EIS for the proposed replacement or rehabilitation of the historic Albion River Bridge.

RES-10

THIS PAGE INTENTIONALLY LEFT BLANK
John Ballas, PE
F. Utility Research and Coordination Task Lead; M. Prior Rights Expertise Task Lead
RES-11
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 34311

YEARS OF

EXPERIENCE
43 YEARS WITH FIRM
7 John has over 43 years of experience in the management of public capital improvement projects. He has worked on numerous highway projects with improvements on state right-of-way. He has overseen the preparation of the conflict maps and matrix and has led the preparation of relocation claim letters. John also has experience preparing utility agreements for Caltrans approval reviews.

LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E, Los Angeles, CA. Utility Coordinator. John serves as the Utility Coordinator for oil, gas, water, telecommunications, and both SCE transmission/ distribution relocations on five local streets that cross under the proposed bridges along both sides of I-405. LA Metro, Caltrans District 7, and the South Bay Cities Council of Governments are proposing improvements to I-405 from Redondo Beach Boulevard to El Segundo Boulevard. Currently, HDR is the prime consultant delivering the PS&E phase. The project involves the addition of five auxiliary lanes to I-405 that requires extensive coordination with Caltrans and the corridor Cities of Hawthorne, Redondo Beach, Lawndale, and Torrance.

LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E, Los Angeles County, CA. Right-of-Way and Utility Coordinator.

John serves as the Right-of-Way and Utility Coordinator for water, telecommunications, and both SCE transmission/distribution relocations for both $260M freeway contracts under construction and the preceding $45M contract to reconfigure the Diamond Bar Golf Course. HDR was tasked to prepare the PS&E for a westbound SR-60/Grand Avenue offramp. The PS&E was completed and approved by Caltrans District 7 within 15 months, with construction being completed in 2015. In 2019, LA Metro selected HDR to prepare the PS&E of the final phase of the SR‑57/SR60 Confluence Project. HDR completed the final construction documents for the eastbound off-ramp connector, eastbound bypass connector east of Diamond Bar Boulevard, and the replacement of the Grand Avenue overcrossing structure.

RES-12

JOHN BALLAS, PE (CONTINUED)
City of Oxnard, Rice Avenue Grade Separation
PS&E, Oxnard, CA. Deputy Project Manager/
Right-of-Way/Utility Coordinator. John serves
as Deputy Project Manager/ Right-of-Way/ Utility
Coordinator for this $79M project to elevate Rice
Avenue above Union Pacific Railroad (UP) and SR34. HDR is responsible for delivering the PSR-PDS, PA&ED, and the final design (100 percent PS&E)
to elevate Rice Avenue over the Santa Barbara
Subdivision of the UP and SR-34 in the City of
Oxnard and County of Ventura. The project scope
involves developing feasible design alternatives,
preparing the Project Report, and verifying design
parameters complied with UP-BNSF Guidelines
for railroad grade separation projects. HDR also
prepared a Supplemental Project Report, and
Advance Planning Studies for two structures - a
two-span bridge and a four-span bridge were -
considered as possible options for construction.

Industry Urban Development Agency, Grand
Avenue/Golden Springs Drive, Diamond Bar,
CA. Project Manager/ Right-of-Way/ Utility
Coordinator. John is the Project Manager/ Rightof-Way/ Utility Coordinator for this $14M project for intersection widening with construction of golf
cart tunnel underneath Grand Avenue. The project
includes an additional northbound lane, an additional
southbound approach lane along Grand Avenue,
and a dedicated westbound right-turn lane along
Golden Springs Drive. The widening extends 1,600
feet along Grand Avenue and 1,000 feet along
Golden Springs Drive.

Transportation Corridor Agencies (TCA), SR-241/
SR-91 Express Connector PS&E, Orange and
Riverside Counties, CA. Utility Coordinator. John
is the Utility Coordinator for SCE distribution and
AT&T relocations for a $423M contract to construct
a direct connector between 241 Toll Road and 91
Express Lanes. The project is located at the junction
of SR-241 and SR-91 in the Counties of Orange
and Riverside. It proposes to construct a medianto-median connector between SR-241 and SR-91 Express Lanes as a tolled facility.

City of Industry, Industry Business Center
Industrial Complex, City of Industry, CA. City
Engineer. John was responsible for aspects of
developing the City of Industry-owned 600-acre
hillside property into an industrial complex with
300 acres of finished pads, including the mass
grading of 25 million cubic yards, and the layout
and construction of interior roadways, drainage
and City of Industry-owned utilities. He oversaw
the development and implementation of $172M
of infrastructure with funding provided by the sale
of properties mandated by the Redevelopment
Agency Dissolution in California. John successfully
coordinated approvals of enforceable obligations
with the Oversight Board and California State
Department of Finance.

Danny Mendoza
G. Right-of-Way Phase and Determination Task Lead
RES-13
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
College Coursework

YEARS OF

EXPERIENCE
22 YEARS WITH FIRM
5 Danny has over 22 years of experience in the right-of-way industry. He has worked on projects related to acquisition, relocation, project management, property management, and project estimating/budgeting. He has been instrumental in the development of key project schedules and budgets for large multimillion-dollar projects.

City of Manhattan Beach, SR-1/Sepulveda Bridge Widening PS&E, Manhattan Beach, CA. Right-of-Way Project Support. Danny coordinated with the project design team, City of Manhattan Beach, Caltrans, and various utility companies to execute utility agreements and finalize the Caltrans Certification Package. The SR-1/Sepulveda Bridge Widening Project consists of widening Sepulveda Boulevard between 33rd Street and Rosecrans Avenue.

LA Metro, Link US Project, Los Angeles, CA. Right-of-Way Support.

Danny was responsible for establishing parcel impacts, project costs, and right-of-way guidelines for the project. He worked directly with the design team to establish plans based on impacts and costs. HDR is providing preliminary engineering, environmental document, final design, and construction support for the project.

Housing Authority of the City of Los Angeles, Jordan Downs Redevelopment Project, Los Angeles, CA. Project Manager. Danny developed the relocation program for over 150 residential relocations.

He reviewed and updated the project relocation plan, assisted in the development of project forms and templates, tracked progress reports and budgets, and coordinated public outreach efforts. The Jordan Downs Redevelopment Project is a multi-phase housing redevelopment project, and the initial phase included the development of the newly constructed community and the relocation of 150 units.

SGVCOG, Turnbull Canyon Road Grade Separation Project, City of Industry, CA. Right-of-Way Support. Danny is responsible for reviewing the project specifications and establishing the initial right-of-way costs for the project. Additionally, he is maintaining and overseeing the project schedule and project budget. HDR is providing right-of-way delivery services for SGVCOG to purchase right-of-way required to construct the Turnbull Canyon Road Grade Separation Project.

RES-14

DANNY MENDOZA (CONTINUED)
SGVCOG, Montebello Boulevard Grade
Separation Right-of-Way, Montebello, CA. Rightof-Way Support. Danny worked closely with the right-of-way team and the designers to finalize the
project impacts and establish the initial right-of-way
cost estimate. Additionally, he developed the budget
and schedule tracking system used to monitor and
track progress on a case-by-case basis. SGVCOG
is planning to construct a grade separation of the
UP between Olympic Boulevard and Roosevelt
Avenue, which will require the lowering of
Montebello Avenue under the existing UP tracks
in the City of Montebello. In addition, SGVCOG
is planning to enhance the safety improvements
at the railroad crossings on Maple, Greenwood,
and Vail Avenues. The project will serve the public
interest by eliminating crossing collisions, queuing,
and congestion, reducing vehicle emissions at the
underpass and improving safety at the crossings.

City of Santa Ana, Santa Ana Bristol Widening,
Santa Ana, CA. Project Controls/Relocation
Agent. Danny worked directly with client and
project managers to assist with relocating over 40
residential units and 30 businesses. He conducted
occupant interviews and reviewed income
data. The project included both residential and
business acquisitions and relocations for the future
development and widening of Bristol Street between
Washington Avenue and 17th Street in the City of
Santa Ana.

Orange County Transportation Authority
(OCTA), Lincoln Avenue Relocation, Anaheim,
CA. Project Manager. Danny was responsible for
the overall final delivery of the desired site for the
Lincoln Avenue/I-5 off-ramp. He provided technical
support that aided in the relocation efforts of two
auto repair shops and one tire shop. Additionally, he
served as the main point of contact with OCTA and
provided input and support to keep the project on
schedule and within budget. The project provided
relocation assistance for displaced tenants at 1514-
1520 W. Lincoln Avenue, Anaheim, due to I-5 North
Widening Project.

OCTA, Right-of-Way Services for SR-55
Improvement Project (Northbound Only),
Orange County, CA. Project Manager. Danny
was responsible for the overall delivery of property
needed for the project. He worked directly with
OCTA, the design team, legal team, and supporting
sub-consultants. HDR provided right-of-way delivery
services required for OCTA to purchase right-ofway required to construct the SR-55 Improvement project. The project widened SR-55 between I-405
and I-5 and proposed to reduce traffic congestion
and improve mobility and traffic operations of an
existing 4-mile stretch of SR-55.

Melissa Rodriguez, PE
H. Design Task Lead
RES-15
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 77982

YEARS OF

EXPERIENCE
19 YEARS WITH FIRM
7 Melissa has over 19 years of planning and design experience for transportation projects, including project management, roadway design, and the preparation of utility plans, utility coordination and preliminary relocation design; stage construction and traffic handling plans; quantities and cost estimates; and geometric design. She is skilled in leading multidisciplinary design teams. She has strong working relationships with LA Metro, Caltrans District 7, cities, and agency staff throughout Southern California.

LA Metro, Whittier Boulevard Intersection Improvements PS&E, Whittier, CA. Engineering Manager and Task Order Manager. Melissa is responsible for coordinating with LA Metro, City of Whittier, and Caltrans staff for timely delivery of two PS&E packages for the City of Whittier. She is overseeing the roadway, drainage, and signing and striping designs, as well as leading the utility coordination. Additionally, Melissa is coordinating with sub-consultants and providing quality reviews for both plan sets and reports for consistency with Caltrans and City of Whittier comments.

The project proposes the street widening and intersection improvements at Whittier Boulevard/Painter Avenue and Whittier Boulevard/Santa Fe Springs Road and includes the reconstruction of ADA-compliant curb ramps, driveways, sidewalks, curb returns, and curbed medians.

LA Metro, I-605/Valley Boulevard Interchange PS&E, Los Angeles County, CA. Engineering Manager. Melissa is responsible for the design of the pavement delineation and signing improvements. She is managing the drainage design and development of the drainage report and Storm Water Data Report (SWDR) while also providing guidance to the roadway team regarding multi-agency coordination. During the Project Report development, Melissa was responsible for managing the development of the SWDR, Intersection Control Evaluation (ICE) memorandum and Exception to Ramp Metering Policy. This project proposes to improve mobility and relieve congestion, increase capacity, and other related deficiencies on I-605 at the Valley Boulevard interchange, including highaccident-rate locations, inadequate truck turn paths, nonstandard lane and shoulder widths along loop ramps, and non-compliant ADA facilities.

RES-16

MELISSA RODRIGUEZ, PE (CONTINUED)
LA Metro, City of Compton Intersection
Improvements PA&ED, Compton, CA.

Engineering Manager. Melissa was responsible for
managing the analysis and environmental clearance
of two intersection to improve mobility. The project
involved significant coordination with LA Metro, LA
County, and the City of Compton in considering
their on-going projects, including LA Metro’s I-710
Integrated Corridor Management Project and the LA
County Highway Safety Improvement Program.

LA Metro, I-605 CIP PA&ED, Los Angeles
County, CA. Task Lead. Melissa is responsible
for providing support for the development of
geometrics and stage construction concepts for
corridor widening and interchange improvement
alternatives. She is coordinating submittals with
LA Metro and Caltrans staff, assisting in the
development of the Project Report, and providing
support to the environmental team in development
of the Environmental Document. In addition, Melissa
is responsible for the development of the Noise
Abatement Decision Report, requiring coordination
with the I-605/I-5 project team as well as reviewing
right-of-way impacts to reduce/eliminate impacts with
approvable geometric modifications.

LA Metro, I-405 Auxiliary Lanes Improvement
Project PA&ED, Los Angeles, CA. Project
Engineer. Melissa was responsible for developing
engineering studies in support of the Project Report
development. The project proposes improvements
to I-405 from Redondo Beach Boulevard to El
Segundo Boulevard which include the addition of
auxiliary lanes within Caltrans’ right-of-way and a
lane extension along southbound I-405 between
the I-105 connector and the off-ramp to eastbound
Rosecrans Avenue. Melissa was also responsible
for developing the SWDR and providing support
and review for development of the Drainage Report,
Utility Impact Report, and Utility Encroachment
Report.

LA Metro, PCH Mobility Improvement Project
PA&ED, Hermosa Beach, CA. Engineering Lead.

Melissa is responsible for coordinating with LA
Metro, City of Hermosa Beach, and Caltrans staff for
delivery of an Alternative Analysis in preparation for
the Project Report-level tasks. She is coordinating
the traffic analysis results with environmental input to determine the appropriate environmental document
to meet the needs of the City of Hermosa Beach.

This purpose of the project is to improve mobility
and recurring congestion and enhance traffic safety.

LA Metro, City of Lynwood Imperial Highway
Corridor Capacity Enhancements PA&ED
and PS&E, Lynwood, CA. Project Engineer.

Melissa was responsible for providing support in
development of the Traffic Study with accident
analysis and review of proposed geometric
improvements at 11 intersections along Imperial
Highway between State Street and Wright Road.

The project improvements included implementing
focused congestion mitigation measures with
intersection improvements along Imperial Highway,
providing congestion relief during peak hours and
enhancing safety improvements.

Robert Yates
I. Construction Phase Authorization Task Lead; L. Grant Administration Task Lead
RES-17
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
BASc, Geography
AAS, Applied
Horticulture and
Horticultural Business
Studies

YEARS OF

EXPERIENCE
32 YEARS WITH FIRM
5 Robert has 32 years of transportation planning experience in the Southern California area. He has been instrumental in developing strategic planning studies for several of HDR’s clients and award-generating grant applications. He is an outside-of-the-box innovator in transportation project definition, transportation project development, and funding strategy design.

City of Beverly Hills Department of Public Works, North Portal RAISE Grant Application, Beverly Hills, CA. Project Manager. Robert was responsible for the development of a Federal Transit Administration (FTA)- compliant RAISE grant application and associated benefit-cost analysis (BCA) in response to the Notice of Funding Opportunities (NOFO). The application first entailed the strategic identification of project benefits in alignment with the RAISE program evaluation criteria. In managing the project, Robert implemented the grant development schedule, narrative outline, reviews in coordination with City of Beverly Hills staff, and the delivery of the application and supporting materials for input into the RAISE Grants website. A notable feature of this effort was the condensed timeframe required to develop the application package so as to meet the submission date. The grant application requested $10M from the federal government to finalize the construction funding element of the project budget.

LA Metro, Link US Project - Transit and Intercity Rail Capital Program (TIRCP) Grant Application. Los Angeles, CA. Project Manager. At LA Metro’s direction, Robert took a primary role in constructing the narrative for the Link US Project TIRCP grant application necessary in order to complete the funding package. A unique aspect of the application was that it was packaged with the Metrolink Southern California Optimized Rail Expansion (SCORE) Program application which required Robert to work in close collaboration with Metrolink staff and consultants in order to merge the Link US Project into the overall grant application. The award by California State Transportation Agency (CalSTA) for Link US was the entirety of the first ask of $393M.

RES-18

ROBERT YATES (CONTINUED)
Metrolink, SCORE Interim Program Management
Consultant (PMC), Los Angeles, CA. Cost
Benefit and Operations Analysis (CBOA)
Project Manager. Robert was responsible for the
development of the SCORE CBOA. Robert worked
to verify that the modeling efforts were synchronized
between the service goals and objectives identified
by Metrolink and that the forecasting work was
integrated into the scenario development process.

A final report identifying costs, revenues, and
ridership for the various milestone year scenarios
was delivered to Metrolink for use in service delivery
discussions with the member agencies as well as
integration into the recently completed Agency Wide
Strategic Plan.

Metrolink, Agency Wide Strategic Plan,
Los Angeles, CA. HDR Project Manager.

With HDR acting in the role of sub-consultant,
Robert’s role was to support the identification
of the existing agency condition with respect to
capital infrastructure, operations, costs, internal
organization, and political structure. This effort
served as a baseline with which to jump-start the
development of the Agency Wide Strategic Plan.

Upon completion of the baseline, Robert and
the HDR team were tasked with supporting the
future scenario building exercise, relying on HDR’s
underlying knowledge base of Metrolink. Robert and
the HDR team then provided input into the Agency
Wide Strategic Plan which was presented to and
approved by the Metrolink Board of Directors.

RCTC, Coachella Valley-San Gorgonio Pass
Rail Service - Federal Railroad Consolidated
Rail Infrastructure and Safety Improvements
(CRISI) Grant Application, Riverside and
Los Angeles Counties, CA. Project Manager.

Robert was responsible for the preparation of the
grant application for 2021 CRISI funds supporting
the preliminary engineering and environmental
documentation effort for the Coachella Valley-San
Gorgonio Pass Rail Service Project. Additionally,
in support of the CRISI application, Robert and
his team also provided technical assistance at the
state level to secure Interregional Transportation
Improvement Program (ITIP) and State
Transportation Improvement Program (STIP) funding
from the California Transportation Commission for
RCTC which would act as the match to the federal
application.

RCTC, Perris Valley Line Corridor-Wide
Transit-Oriented Communities (TOC) FTA
Grant Application, Riverside County, CA.

Project Manager. Robert was responsible for the
development of a grant application in response
to a FTA NOFO for TOC Planning Studies. The
application entailed the identification of land uses
at the Traffic Analysis Zone level and identification
of congressional districts and opportunity zones, as
well as the development of a planning study scope of
work, schedule, deliverables, and outreach process
along the Perris Valley Line Metrolink corridor. The
grant application award received by RCTC from the
FTA is valued at $750K.

Henry Tong, PE
J. Bid Support Services Task Lead
RES-19
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 81357

YEARS OF

EXPERIENCE
12 YEARS WITH FIRM
12 Henry has over 12 years of design experience in highway engineering projects. His experience includes designs of numerous regional and local highway facilities, roadway geometrics (horizontal and vertical), interchanges, analyses of Caltrans design exceptions, and preparation of detailed quantity and cost estimates. He is specialized in civil surface modeling with InRoads and has prepared 3-D design models for entire freeway interchanges and precise earthwork models for grade separation projects.

LA Metro, City of Lynwood Imperial Highway Corridor Capacity Enhancements PA&ED and PS&E, Lynwood, CA. Senior Project Engineer. Henry was responsible for management and delivery of the 65 percent, 95 percent, and 100 percent PS&E submittal packages. He also provided bidding assistance to the City of Lynwood. In cooperation with the City of Lynwood, LA Metro is proposing enhancements to Imperial Highway between State Street and Wright Road in the City of Lynwood.

The proposed intersection enhancements would include increased storage length to existing turns, additional left-turn lanes, additional turn movements, upgraded signage, raised medians, and improved pedestrian safety with new continental crosswalks for increased visibility. These proposed enhancements are part of the I-710 South Corridor Improvement Early Action Program to complete environmental approval and 35 percent engineering for signal synchronization at 11 intersections with additional geometric improvements at 6 of those intersections in the City of Lynwood.

The intersections are along Imperial Highway at State Street, Long Beach Boulevard, California Avenue, Bullis Road, Atlantic Avenue, and Wright Road. HDR is currently leading the project and will prepare the final PS&E and design services during construction for the proposed enhancements.

LA Metro, I-605 CIP PA&ED, Los Angeles County, CA. Senior Project Engineer. Henry was responsible for identifying and evaluating the nonstandard design features along SR-60 and I-605 to be included in the Project Report and Design Standard Decision Document. Caltrans, LA Metro, GCCOG, and SGVCOG propose 15 miles of highway improvements along the I-605 corridor from I-105 to I-10, and 9 miles of highway improvements along SR-60 from Santa Ana Avenue to Hacienda Boulevard.

RES-20

HENRY TONG, PE (CONTINUED)
City of Oxnard, Rice Avenue Grade Separation
PS&E, Oxnard, CA. Senior Project Engineer.

Henry is responsible for management and delivery
of the 65 percent and 95 percent PS&E submittal
packages. HDR is responsible for delivering the
PSR-PDS, PA&ED, and the final design (100
percent PS&E) to elevate Rice Avenue over the
Santa Barbara Subdivision of the UP and SR-34
in the City of Oxnard and County of Ventura. The
project scope involves developing feasible design
alternatives, preparing the Project Report, and
verifying design parameters complied with UP-BNSF
Guidelines for railroad grade separation projects.

HDR also prepared a Supplemental Project Report,
and Advance Planning Studies for two structures
- a two-span bridge and a four-span bridge - were
considered as possible options for construction.

City of Agoura Hills, Palo Comado Canyon
Road Interchange Improvements PS&E, Agoura
Hills, CA. Project Engineer. Henry developed
the signing, pavement delineation, and stage
construction plans for the US-101 interchange at
Palo Comado Canyon Road. The $22M project
involved realigning the existing northbound on- and
off-ramps and widening the Palo Comado Canyon
Road overcrossing bridge. Henry also prepared
supplemental fact sheets for design exceptions not
identified in the PA&ED phase.

Exposition Construction Authority, Phase
2 Venice Boulevard Roadway Improvement
Design-Build Design Revisions, Los Angeles
County, CA. Project Engineer. Henry was
responsible for revising the previously approved
roadway design along Venice Boulevard from Culver
Boulevard to Ivy Street. The design-build project
involved eliminating the roadway widening east of
National Boulevard to avoid relocations of multiple
high-cost utility poles. Henry managed the design
and revisions of street improvement plans, pavement
delineations, construction details, utility relocations, sign relocations, traffic signal plans, as well as
construction quantities. He completed the design
and obtained approvals of the project with the six
governing agencies, including Caltrans, LABOE and
LADOT. Henry also provided design support during
construction.

Foothill Gold Line Construction Authority, Gold
Line Extension Phase 2B, Los Angeles County,
CA. Project Engineer. Henry was responsible for
preparing and obtaining Caltrans approval of the
PSR-PR for this project. He also coordinated with
LA Metro and rail design consultants to prepare
preliminary designs for two tieback retaining walls
under the existing SR-57 and I-210 bridges, as well
as an emergency access road for the rail within
Caltrans right-of-way. The project involved a 24-mile
light rail extension of the Metro Gold Line from East
Pasadena in Los Angeles County to Montclair in San
Bernardino County.

Hank Alonso, PE
K. Construction Support Services Task Lead
RES-21
City of Pico Rivera, On-Call Engineering Services
K. Resumes

RELEVANT EXPERIENCE
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 44616

YEARS OF

EXPERIENCE
40 YEARS WITH FIRM
< 1
Hank has more than 40 years of experience in transportation, including managing major highway corridor and bridge construction projects. He spent 21 years at Caltrans District 12 directing and managing engineering work related to highway, bridge, and infrastructure design projects. Hank has an insider’s knowledge and insight into the procedures, processes, and standards of Caltrans.

LA Metro, Exposition Line Light Rail Transit (LRT), Los Angeles, CA.

Project Manager. Hank managed projects for construction management of $862M deep trench excavation with cast-in-drilled-hole (CIDH) secant pile walls, massive export of excavated materials, railroad bridge flood control channel crossings, and railroad coordination.

POLB, Ocean Boulevard/Terminal Island Freeway Interchange, Long Beach, CA. Project Manager. Hank was a manager of projects for the $35M construction management contract. He identified lane closure chart deficiencies and supervised an extensive road closure package while the Resident Engineer continuously monitored the traffic switches. Hank saved 45 construction days. The project raised Ocean Boulevard to create gradeseparated interchanges at Terminal Island Freeway and at Pier S Avenue.

The project constructed two new cast-in-place, pre-stressed, reinforced concrete box girder bridges supported on stone columns and steel driven piles.

SGVCOG, San Gabriel Trench Project Construction Management, San Gabriel, CA. Project Manager. Hank was responsible for the $33M, 2.2- mile grade separation project that will result in the lowering of a 1.4-mile section of UP track in a trench through the City of San Gabriel.

TCA, SR-241 Foothill/Eastern Transportation Corridor, Orange County, CA. Construction Manager. Hank developed a comprehensive construction inspection and Quality Assurance (QA) program. This $803M project included 25.4 miles of toll road construction, including four freewayto-freeway interchanges, five interchanges, 69 bridges, three tunnels, and 10 toll plazas. The corridor consists of a four- to six-lane road with structures spanning 12 active highway lanes. Work was performed by four prime contractors. Major segments of the corridor opened 14 months ahead of schedule.

RES-22

HANK ALONSO, PE (CONTINUED)
TCA/Caltrans District 12, SR-73, San Joaquin
Hills Transportation Corridor Design-Build
Project, Orange County, CA. Construction
Manager. Hank served as Construction Manager
while with Caltrans for this project. This $830M,
16-mile, design-build toll road features a new sixlane roadway, 11 interchanges, 76 bridges, and more than 1.2 million square feet of mechanically
stabilized embankment (MSE) walls. The project
won Project of the Year from the American Society
of Civil Engineers, Design-Build Institute of America,
and Orange County Consulting Engineers Council.

The project opened 4 months ahead of schedule
with no outstanding claims or disputes. Change
orders were less than 3 percent.

OCTA/Caltrans District 12, SR-55 Improvement
Project (I-405 to I-5), Orange County, CA.

Constructability/Risk Management. Hank
performed constructability reviews and risk
management for OCTA, in partnership with Caltrans
District 12, to widen SR-55 from I-405 to I-5. The
$45M project will improve mobility and reduce
congestion during peak commute hours. The project
also includes adding a second HOV lane in each
direction for a length of four miles.

SBCTA, I-10 Corridor Express Lanes Contract
One, Design-Build Project and Construction
Management, San Bernardino County, CA.

Oversight Construction Manager. Hank was
responsible for verifying that the contractor complied
with quality requirements during the construction of
I-10 between Los Angeles County line and the I-15
in San Bernardino County. He worked closely with
the procurement team to confirm the project was
constructible and the schedule was achievable.

City of Bakersfield, Wastewater Treatment Plant
No. 3, Bakersfield, CA. Principal-in-Charge. Hank
was responsible for the $250M project that involved
the upgrade and expansion of Wastewater Treatment
Plant No. 3, increasing capacity from 12 to 16 million
gallons per day. Construction included primary and
secondary clarifiers, a trickling filter, two digesters, new sludge drying beds, odor control facilities, and
other work.

City of Palmdale, Infrastructure Improvements
Program, Palmdale, CA. Principal-in-Charge.

Hank was responsible for this $100M project which
required program management expertise to provide
the backbone infrastructure needed to support
new commercial, light industrial, and residential
development in California’s fastest growing city.

City of San Diego, Point Loma Wastewater
Treatment Plant Grit Processing Improvement
Construction Management, San Diego, CA.

Project Director. Hank oversaw the $30M project
with major components, including reconstruction of
the south grit tanks and its adjacent pump gallery
and replacement of the 1962 grit processing
headworks building with an odor-controlled, drivethrough facility which will include new grit-processing equipment. Improvements to the reconstructed
south grit tanks will include widening and deepening
the channels as well as relocation of the tank
influent and effluent ports to increase detention
time, increasing the slope of the tank bottom to
promote grit migration, and installation of longitudinal and transverse baffles to promote grit removal.

Improvements to the new headworks building will
include new grit storage and loading facility which
will replace the existing Cyclone grit separators
with the newer technology of Teacups and Snail grit
classifiers.

Steve Crouch, PE
Quality Manager
FIRM
HDR

EDUCATION
Coursework, Civil/
Structural Engineering

REGISTRATIONS
PE, Civil, CA 59969

YEARS OF

EXPERIENCE
38 YEARS WITH FIRM
11 Steve has worked in the transportation engineering field for over 38 years. He has been involved with developmental aspects of roadway projects, including, but not limited to, PSRs, Environmental Studies and Reports, Project Reports, final PS&E packages, and roadway construction.
• LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program (Sidewalk Acceleration Team Design Manager)
• City of Long Beach, Various Pedestrian Accessibility Improvements Design - Curb Ramps and Path of Travel (Project Manager)
• City of San Juan Capistrano, Camino Capistrano ADA-Compliant Curb Ramp Design (Senior Project Manager)
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 63433

YEARS OF

EXPERIENCE
25 YEARS WITH FIRM
4 Terence has over 25 years of experience managing and designing transportation projects, including managed lanes, freeway corridors, interchanges, grade separations, and local highways. He has served as project manager and lead engineer on multiple projects where he was responsible for stakeholder coordination while managing project delivery. • LABOE, Sixth Street Viaduct Replacement (Project Manager and Roadway Design Lead)
• LABOE, Complete Streets Division (Project Manager)
• LA Metro, Florence Avenue/Centinela Avenue Grade Separation (Task Manager)
Terence Pao, PE
A. Project Management Support
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 78380

YEARS OF

EXPERIENCE
15 YEARS WITH FIRM
7 Garrett has over 15 years of transportation engineering project experience, specializing in PSR, PA&ED, and PS&E for Caltrans and various local agencies. He has managed multiple projects with responsibilities that include client and sub-consultant coordination, project schedule preparation, and project budget management.
• City of Camarillo, US-101 Northbound Auxiliary Lanes and Ramp Metering PSR-PDS (Project Engineer)
• City of Oxnard, Rice Avenue Grade Separation PS&E (Oversight Engineer) • LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E (Design Oversight Engineer)
Garrett Kaya, PE
A. Project Management Support
RES-23
City of Pico Rivera, On-Call Engineering Services
K. Resumes
Edna Jimenez
B. Community Outreach Support
FIRM
ARE

EDUCATION
BS, Urban and
Regional Planning

YEARS OF

EXPERIENCE
11 YEARS WITH FIRM
11 Edna has over 11 years of experience in transportation, planning, environmental, and construction projects. She is a natural leader and excels at building relationships with various stakeholders, including agencies, business organizations, community-based organizations, and faith-based communities. • City of Pico Rivera, Telegraph Road Over San Gabriel River Bridge Replacement (Project Manager)
• City of Pico Rivera, Washington Boulevard Over Rio Hondo Channel (Project Manager)
• LA Metro, Eastside Transit Corridor Phase 2 (Project Manager) FIRM
HDR

EDUCATION
BA, Political Science
and Communication

YEARS OF

EXPERIENCE
4 YEARS WITH FIRM
2 Ally has over 4 years of experience working in public relations and public outreach. She works closely with the Strategic Communication Project Managers to implement successful communications and outreach campaigns, acts as a secondary interface with clients, and manages outreach tactics and deliverables.
• LACDPW, LA County Proposition 218 Outreach Support (Strategic Communications Coordinator)
• SoCalGas, Community Engagement Plan for Climate Adaptation Vulnerability Assessment (Strategic Communications Coordinator) • City of Tracy, Infrastructure Master Plans (Strategic Communications Coordinator)
Allyson Jeffers
B. Community Outreach Support
FIRM
HDR

EDUCATION
BS, Graphic Design/
Artist

YEARS OF

EXPERIENCE
18 YEARS WITH FIRM
12 Kolton has more than 18 years of graphic design experience, which includes creating print, web, and multimedia work for a variety of projects. His skills include extensive experience in Adobe Photoshop, Adobe InDesign, Adobe Illustrator, Adobe AfterEffects, Flash, Dreamweaver, Corel Painter IX, and QuarkXPress 8.
• City of Tracy, 11th Street - East Tracy Overhead Bridge Replacement (Graphic Artist)
• City of Yucaipa, I-10/Wildwood Canyon Road Interchange PA&ED (Graphic Artist)
• San Luis Obispo Council of Governments (SLOCOG), Coast Rail Corridor Service Implementation Plan (SIP) and Passenger Rail Improvement Study (PRIS) (Graphic Artist)
Kolton Kammerer
B. Community Outreach Support
RES-24
Marie Lewis Adams, AICP
C. Preliminary Engineering and Planning Studies Support FIRM
HDR

EDUCATION
MCP, City and
Regional Planning
BA, Geography

REGISTRATIONS
AICP, CA 181750

YEARS OF

EXPERIENCE
18 YEARS WITH FIRM
1 Marie has more than 18 years of experience in the planning and transportation sector. Her varied experience includes bus, rail, roadway, and freight projects as well as extensive public engagement expertise. She has a strong background in developing comprehensive transportation plans. • Santa Maria Area Transit, Zero-Emissions Bus Rollout Plan (Zero-Emissions Planning Lead)
• SLOCOG, Coast Rail Corridor SIP and PRIS (Deputy Project Manager/ Planner)
• OCTA, South Orange County Rail Station Feasibility Study (Project Manager) FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 43549

YEARS OF

EXPERIENCE
44 YEARS WITH FIRM
8 Doug has 44 years of broad experience in the management and development of ITS, transportation, and traffic engineering projects on city and county roadway networks. He has specific experience in the development of final design plans for projects in Caltrans District 7 and LA County. He has directed the preparation of numerous Transportation Management Plans, PSRs, Project Reports, and PS&Es.
• LACDPW, Norwalk Traffic Design (Task Order Manager)
• LACDPW, Smart Streetlight/Smart City Technologies (Task Order Manager) • City of Laguna Beach, Laguna Canyon Road (SR-133) PSR-PDS (Lead Traffic Engineer)
Doug Smith, PE
C. Preliminary Engineering and Planning Studies Support; H. Design Support
FIRM
AMH

EDUCATION
BS, Environmental
Engineering

REGISTRATIONS
EIT, CA 160858

YEARS OF

EXPERIENCE
6 YEARS WITH FIRM
1 Jonathon has over 6 years of experience in civil design, focusing on site development, storm water management, land development, and roadway. His expertise in AutoCAD, Civil 3D, MicroStation, and hydraulic and hydrologic analysis aligns with the demands of large-scale projects. • POLB, Pier B On-Dock Rail Support Facility (Civil Engineer) • Various other project experience includes developing grading, drainage plans, site plans, variance plans, storm water designs, and civil plan sets with cross sections, cut/fill calculations, and hydrologic/hydraulic analysis for optimal Best Management Practices (BMPs).

Jonathon Damora, EIT
C. Preliminary Engineering and Planning Studies Support RES-25
City of Pico Rivera, On-Call Engineering Services
K. Resumes
Rohit Itadkar, PE, TE
C. Preliminary Engineering and Planning Studies Support FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 92404
PE, Traffic, CA 2754

YEARS OF

EXPERIENCE
15 YEARS WITH FIRM
5 Rohit has more than 15 years of experience in multiple facets of the transportation industry. He has a comprehensive knowledge of transportation engineering guidelines and requirements of CEQA/NEPA, SB 743, Institute of Transportation Engineers (ITE), Caltrans Standard Plans, and California MUTCD.
• LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program (Senior Traffic Engineer)
• LACDPW, Smart Streetlight/Smart City Technologies (Engineer) • City of Santa Ana, Santa Ana Safe Mobility Plan (Project Engineer) FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil and
Environmental
Engineering

REGISTRATIONS
PE, Civil, CA 93296

YEARS OF

EXPERIENCE
10 YEARS WITH FIRM
7 Alex is a highway engineer with over 10 years of experience in transportation engineering. His experience includes roadway design, bikeway design, freeway sign planning and design, and traffic analysis for freeway schematics. He has also worked on drainage layout and design, ADA-compliant sidewalk design, and detailed cost estimating.
• LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program (Civil Engineer)
• LAWA, APM Landside Access Modernization Program (Roadway Engineer) • OCPW, Gilbert Street Improvements PS&E (Roadway Engineer) Alex Kemp, PE
C. Preliminary Engineering and Planning Studies Support FIRM
GSI

EDUCATION
Coursework,
Surveying/Mapping

REGISTRATIONS
PLS, CA 7542

YEARS OF

EXPERIENCE
36 YEARS WITH FIRM
28 Tim brings over 36 years of surveying expertise having managed a multitude of projects throughout Southern California, overseeing staff members, workload, and scheduling. He is highly skilled in aspects of both design and construction surveying.
• LABOE, On-Call Civil Engineering Consulting Services, Safe Sidewalks LA Program (Survey Manager)
• LA Metro, Link US Project (Survey Manager)
• City of Pasadena, On-Call Land Surveying Services (Project Manager) Tim Fettig, PLS
D. Surveys, Mapping, and Field Reviews Support
RES-26
Ryan Todaro
E. Environmental Studies and Documentation Support
FIRM
GPA

EDUCATION
BS, Natural Resources
Management

YEARS OF

EXPERIENCE
24 YEARS WITH FIRM
2 Ryan is a former Caltrans environmental planner with over 24 years of experience providing environmental project management for multiple phases of a project’s life cycle. He intimately understands the federal and state agencies and their requirements to verify legally defensible environmental compliance and the coordination necessary to successfully deliver a project on behalf of a client.
• City of Pico Rivera, Telegraph Road Over San Gabriel River Bridge Replacement (Project Manager)
• City of Pico Rivera, Washington Boulevard Bridge Replacement (Project Manager)
• County of Merced, Pioneer Road Widening (Project Manager) FIRM
GPA

EDUCATION
BS, Marine Biology

YEARS OF

EXPERIENCE
16 YEARS WITH FIRM
12 Jennifer manages biological resources database research, habitat assessments, technical reports, regulatory permit applications, construction monitoring, and restoration monitoring for GPA. Her expertise includes compliance pursuant to NEPA, CEQA, federal and state ESAs, CWA, California Fish and Game Code, and other environmental laws.
• City of Pico Rivera, Telegraph Road Over San Gabriel River Bridge Replacement (Biological Resources Lead)
• City of Los Angeles, Sixth Street Viaduct Replacement (Biological Resources Lead)
• City of Los Angeles, Huntington Drive Multimodal Transportation Improvement Project, Phase 1 (Biological Resources QA/QC) Jennifer Johnson
E. Environmental Studies and Documentation Support
FIRM
KES

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 31651

YEARS OF

EXPERIENCE
23 YEARS WITH FIRM
10 Philip has over 23 years of experience in analyzing environmental compliance.

He is responsible for environmental site investigations and environmental compliance on public construction projects.
• LA Metro, Westside Purple Line Section 3 (Principal Environmental Engineer) • LA Metro, Regional Connector (Principal Environmental Engineer) • Valley Transportation Authority (VTA), BART Silicon Valley Extension (Principal Environmental Engineer)
Philip Jo, PE
E. Environmental Studies and Documentation Support
RES-27
City of Pico Rivera, On-Call Engineering Services
K. Resumes
Kate Suenram, PE
F. Utility Research and Coordination Support
FIRM
S&A

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 72757

YEARS OF

EXPERIENCE
20 YEARS WITH FIRM
5 Kate has over 20 years of civil and utility engineering design experience on public works infrastructure projects. Her recent years have been focused on a variety of Los Angeles-based infrastructure projects valued at more than $1B and phased from concept-level planning to design and into construction. • LA Metro, Southeast Gateway Line Transit Corridor Advanced Engineering (Utility Coordination)
• LA Metro, G-Line BRT Improvements Project (Utility Coordination) • Metrolink, I-605/Temple Avenue Grade Separation (Utility Design Review) FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
EIT, CA 145956

YEARS OF

EXPERIENCE
11 YEARS WITH FIRM
7 Raymond has over 11 years of experience in the design and delivery of highway projects. His experience includes roadway geometrics, grading, 3D modeling, preparation of detailed construction plans, cost estimates, utility coordination, and Caltrans roadway retaining walls. He is knowledgeable in both Caltrans design standards and approval processes, as well as local agency requirements.
• LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E (Assistant Engineer)
• LA Metro, I-605 CIP PA&ED (Assistant Engineer)
• TCA, SR-241/SR-91 Express Connector PS&E (Assistant Engineer) Raymond Ma, EIT
F. Utility Research and Coordination Support
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 84953

YEARS OF

EXPERIENCE
11 YEARS WITH FIRM
10 Ryan has over 10 years of design experience in highway/roadway engineering projects. His experience in roadway design includes horizontal roadway geometrics, vertical profiles, contour grading, pavement delineation, signing, stage construction, and preparation of construction cost estimates. He is knowledgeable in both Caltrans and American Association of State Highway and Transportation Officials (AASHTO) design standards and approval processes.
• LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E (Project Engineer/Task Lead)
• LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E (Roadway Lead) • City of Long Beach, Shoemaker Bridge Replacement PS&E (Task Lead - Caltrans Stage Construction)
Ryan Quach, PE
F. Utility Research and Coordination Support; M. Prior Rights Expertise Support
RES-28
Jill Craig
G. Right-of-Way Phase and Determination Support
FIRM
HDR

EDUCATION
BS, City and Regional
Planning

REGISTRATIONS
Real Estate Broker
License, CA 01255902

YEARS OF

EXPERIENCE
26 YEARS WITH FIRM
4 Jill has over 26 years of experience in the right-of-way industry. Her experience includes acquisition and relocation of a wide variety of property owners, tenants, and business owners. She has played a key role in the right-of-way phase of a wide number of highway widening, freeway intersection, and commuter rail projects.
• SCE, Borel Hydroelectric Surrender (Right-of-Way Support) • OCTA, Right-of-Way Services for SR-55 Improvement Project - Northbound Only (Senior Real Estate Services Agent)
• OCTA, PMC Services for Regional Rail Program (M2 Rail Program Support) FIRM
HDR

EDUCATION
BS, Business
Administration and
Management

REGISTRATIONS
Real Estate
Salesperson License,
CA 01950331

YEARS OF

EXPERIENCE
31 YEARS WITH FIRM
< 1
Ruben has over 31 years of working in the public and private sector of real estate services and right-of-way project delivery. He has managed, supervised, and had direct experience in the functions of acquisition and disposition of real property interests, land title review and assessment, escrow coordination, condemnation, property management, relocation, utility relocation coordination, and right-of-way certification.
• Metrolink, SCORE PMC Services (Real Estate Services Project Manager) • SGVCOG, Maple Avenue Overhead Project (Real Estate Services Project Manager)
• SGVCOG, Montebello Boulevard Grade Separation Right-of-Way (Real Estate Services Project Manager)
Ruben Duran
G. Right-of-Way Phase and Determination Support
Josephus Rimorin, PE
H. Design Support
FIRM
V&A

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 78082

YEARS OF

EXPERIENCE
19 YEARS WITH FIRM
14 Josephus has over 19 years of professional engineering experience ranging from preliminary to final engineering on various transit infrastructure projects.

His professional background includes roadway design, grading design, utility design, drainage design, and agency/contractor coordination. • City of Whittier, Environmental Clearance and Preliminary Engineering Services for Intersection Improvements (Senior Project Engineer) • SBCTA, I-10 Express Lanes Phase 1 (Lead Project Engineer) • LA Metro, I-405 Sepulveda Pass Widening (Lead Project Engineer) RES-29
City of Pico Rivera, On-Call Engineering Services
K. Resumes
FIRM
GAI

EDUCATION
PhD, Geotechnical
Engineering
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 65642
PE, Geotech, CA 2824

YEARS OF

EXPERIENCE
38 YEARS WITH FIRM
12 Shawn has over 38 years of experience in the design, supervision, and technical management of projects in the structural and geotechnical fields.

The breadth of his experience includes geotechnical analysis, field and laboratory testing management, slope stability and liquefaction analysis, seismic hazard evaluation, pile and earth retaining structures design, design and implementation of soils and slope stabilization, repair and retrofit methods relevant to soils, foundation, and structural behavior for different types of construction.
• LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E (Principal Geotechnical Engineer)
• LA Metro, I-605 CIP PA&ED (Principal Geotechnical Engineer) • LA Metro, SR-91 Improvement Project PA&ED (Principal Geotechnical Engineer)
Shawn Ariannia, PhD, PE, GE
H. Design Support
Michael Aceves
H. Design Support
FIRM
T&P

EDUCATION
BS, Landscape
Architecture

YEARS OF

EXPERIENCE
31 YEARS WITH FIRM
25 Michael has over 31 years managing transportation-related landscape architecture projects. He has extensive experience with LA Metro, Caltrans, and other stakeholders. He has a comprehensive understanding of the project development process, including VIA, PA&ED, and PS&E.
• LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E (T&P Project Manager)
• LA Metro, I-105 Express Lanes (T&P Project Manager)
• LAWA, APM Landside Access Modernization Program (T&P Project Manager)
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 64770

YEARS OF

EXPERIENCE
23 YEARS WITH FIRM
10 Myles has been responsible for the design and coordination of several multidiscipline transportation and land development projects. He has over 23 years of proven experience with challenging hydrology and hydraulic designs, drainage analyses, water quality management plans, and innovative water quality solutions.
• LA Metro, Link US Project (Concourse Drainage/Utility Manager) • LAWA, APM Landside Access Modernization Program (Drainage Lead) • POLB, Pier B On-Dock Rail Support Facility Program (Drainage and Utility Manager)
Myles Harrold, PE
H. Design Support
RES-30
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 83872
PE, Traffic, CA 2644

YEARS OF

EXPERIENCE
21 YEARS WITH FIRM
7 Kent has over 21 years of professional experience in ITS, traffic, and transportation engineering and design. He has conducted traffic analyses and studies and provided traffic design services on intersection and street improvement projects throughout the Counties of Orange, Los Angeles, San Bernardino, and Riverside.
• LA Metro, I-605 CIP PA&ED (Senior Traffic Engineer)
• LA Metro, Link US Project (Senior Traffic Engineer)
• City of Manhattan Beach, SR-1/Sepulveda Bridge Widening PS&E (Senior Traffic Engineer)
Kent Ko, PE, TE
H. Design Support
Gary Goldman, PE, GE
H. Design Support
FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 54161
PE, Geotech, CA 2587

YEARS OF

EXPERIENCE
34 YEARS WITH FIRM
13 Gary has over 34 years of extensive experience in geotechnical engineering.

His responsibilities have included the preparation of preliminary soils, foundation and percolation reports, and special reports dealing with specific geotechnical challenges. This includes direct contact with the client, consultants, and public agencies as well as coordination and direction of fieldwork, personnel and equipment, laboratory testing, and analysis. • LA Metro, Link US Project (Geotechnical Lead)
• LA Metro, I-605 CIP PA&ED (Task Manager)
• City of Yucaipa, I-10 Wildwood Canyon Road Interchange PA&ED (Task Manager)
FIRM
HDR

EDUCATION
BArch, Architecture

REGISTRATIONS
AIA, CA 35298
LEED AP BD+C

YEARS OF

EXPERIENCE
15 YEARS WITH FIRM
15 Brett embraces the challenge of enhancing rail, bus, and biking infrastructure to improve safety and comfort. She has 15 years of transportation experience, undertaking a variety of projects and coordinating multidisciplinary teams while verifying the design team implements Crime Prevention through Environmental Design (CPTED).
• City of Beverly Hills Public Works Department, Wilshire/Rodeo Station North Portal Project (Architecture Lead)
• LA Metro, Metro Center Project (Project Manager/Architect) • LA Metro, Link US Project (Project Designer)
Brett Brandle, AIA, LEED AP BD+C
H. Design Support
RES-31
City of Pico Rivera, On-Call Engineering Services
K. Resumes
Yana Loginova, PE
H. Design Support
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 95863

YEARS OF

EXPERIENCE
7 YEARS WITH FIRM
< 1
Yana is a transportation engineer with over 7 years of experience in the fields of civil and transportation engineering. Her professional experience includes traffic and electrical design, planning and design for the construction of traffic engineering projects, ITS, traffic signal design, traffic signal communication systems, highway lighting, signing and striping, bikeway design, and traffic control plans.
• City of Pasadena, Union Street Two-Way Protected Cycle Track Project (Design Lead)
• City of Inglewood, Stadium Alternative Mitigation ITS Improvements (Project Manager)
• City of Westminster, Garden Grove Boulevard Active Transportation Program Project (Design Lead)
Montse Martin, PE
H. Design Support
FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 64771

YEARS OF

EXPERIENCE
27 YEARS WITH FIRM
8 Montse has over 27 years of structural engineering experience with the design of bridges, transit stations, and infrastructure facilities. She is highly qualified at multiple levels of project development, from initial concept to the preparation of PS&Es and construction management. She has extensive experience with projects that require multi-agency approval from Caltrans, LA Metro, counties, and cities.
• LA Metro, I-5 North County Improvements (SR-14 to Parker Road) PS&E (Lead Bridge Engineer)
• City of Bakersfield, Centennial Corridor Improvement Project (Senior Bridge Engineer)
• TCA, SR-241/SR-91 Express Connector PS&E (Senior Bridge Engineer) RES-32
Eric Rouse
I. Construction Phase Authorization Support; L. Grant Administration Support
FIRM
HDR

EDUCATION
MS, Community and
Regional Planning
BS, Political Science
and Government

YEARS OF

EXPERIENCE
28 YEARS WITH FIRM
17 Eric has 28 years of experience specializing in the financial, operational, and institutional analyses of existing and planned infrastructure programs. He has been instrumental in the evaluation of potential revenue sources, development of funding strategies, and preparation of successful grant applications for transportation programs across the country.
• City of Lake Elsinore, I-15/SR74 Interchange Improvement Trade Corridor Enhancement Program (TCEP) Grant Application (Project Manager) • City of Las Vegas, Infrastructure Investment and Jobs Act (IIJA) Grant Strategy (Advisor)
• RCTC, Perris Valley Line Corridor Wide TOC FTA Grant Application (Financial and Grant Application Strategist)
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 94964

YEARS OF

EXPERIENCE
5 YEARS WITH FIRM
4 Rvee has 5 years of experience within the transportation engineering field. He assists in the delivery of PA&ED and PS&E projects. He has experience in roadway geometrics, utility process, signing, striping and drainage. Rvee is also familiar with federal and state standards.
• City of Long Beach, Various Pedestrian Accessibility Improvements Design - Curb Ramps and Path of Travel (Highway EIT)
• LA Metro, City of Compton Intersection Improvements PA&ED (Highway EIT) • LA Metro, City of Lynwood Imperial Highway Corridor Capacity Enhancements PA&ED and PS&E (Highway EIT)
Rvee Pontepsiripong, PE
J. Bid Support Services Support
FIRM
HDR

EDUCATION
BS, Civil Engineering

REGISTRATIONS
PE, Civil, CA 37419
CCM, A0074
QSP, 22655

YEARS OF

EXPERIENCE
42 YEARS WITH FIRM
2 Bill has over 42 years of engineering, construction, and project and program management experience with public works projects. His experience includes construction management projects involving construction of highways, rail, municipalities, port/waterfront facilities, marine structures, airports, industrial, commercial, coastal, and recreational facilities.
• POLB, Pier B On-Dock Rail Support Facility Program (Scheduler) • City of San Diego Public Utilities Department, Lake Hodges Near-Term Repair (Task Oversight)
• OCTA, OC Streetcar Program Management Consultant (PMC) Services (Senior Scheduler/Schedule Analyst/Claims Support)
Bill Wood, PE, CCM, QSP
K. Construction Support Services Support
RES-33
City of Pico Rivera, On-Call Engineering Services
K. Resumes
Johnathan Lopez
K. Construction Support Services Support
FIRM
HDR

EDUCATION
High School GED

REGISTRATIONS
Registered
Construction
Inspector, 5984
ICC Reinforced
Concrete Certification,
Inspector, 00044340

YEARS OF

EXPERIENCE
44 YEARS WITH FIRM
2 Johnathan has over 44 years of experience providing construction inspection for public works projects. He has extensive experience with a wide variety of structure construction work, including materials inspection; foundations, including driven and cast in drilled hole piling; inspection of falsework; retaining walls; cast in place and precast structures; post tensioning; and structure demolition.
• City of La Quinta, Adams Street Bridge (Structure Inspector) • City of Indio, Jackson Street Retrofit (Structure Inspector) • RCTC, Construction Management Services I-215/Placentia Interchange (Assistant Structures Representative)
FIRM
HDR

EDUCATION
BS, Electrical
Engineering

REGISTRATIONS
PE, Electrical, CA
23193

YEARS OF

EXPERIENCE
9 YEARS WITH FIRM
1 Andrew has 9 years of experience on a wide range of water, power, and transportation projects. His related water experience includes booster pump station improvements, water treatment plant design, and lift station design. • City of Vista, Agua Hedionda Lift Station Completion Project (Electrical Engineer)
• City of Imperial Beach, On-Call Engineering (Electrical Engineer) • City of San Diego Economic Development, As-Needed Storm Water Engineering Support (Electrical Engineer)
Andrew Tee, PE
K. Construction Support Services Support
RES-34
FIRM
HDR

EDUCATION
BA, Political Science
BA, Economics
MA, Economics

YEARS OF

EXPERIENCE
24 YEARS WITH FIRM
24 Bruno has over 24 years of experience in the economic analysis of transportation infrastructure projects. He possesses strong skills in benefitcost analysis, cost risk analysis, and economic impact analysis. He also has extensive experience in revenue forecasting and construction cost escalation for state departments of transportation.
• City of Beverly Hills Department of Public Works, North Portal RAISE Grant Application (Task Manager)
• City of Camarillo, 2022 Bridge Investment Program (BIP) Grant Application for the Bridge Replacement at Las Posas Road (US-101) and Ventura Boulevard Project (Task Manager)
• SCAG, ADA Paratransit Demand Forecast (Project Manager) Bruno Penet
L. Grant Administration Support
Joel Lessard-Clouston, AICP
L. Grant Administration Support
FIRM
HDR

EDUCATION
MURP, Urban
Planning
BS, Exercise Science

REGISTRATIONS
AICP, CA 35261

YEARS OF

EXPERIENCE
5 YEARS WITH FIRM
3 Joel has over 5 years of experience preparing multimodal planning studies, grant applications, and environmental documents for transportation projects of various modes. He has supported the preparation of grant applications for a variety of state and federal funding programs for intercity rail, regional rail, hybrid rail, heavy rail, and highway projects, securing $68M for local projects. • City of Beverly Hills Public Works Department, North Portal RAISE Grant Application (Grant Writer)
• City of Culver City, Staff Augmentation for Mobility Planning Project Support (Planner)
• City of Ventura, Main Street Bridge over Ventura River Bridge Investment Program (BIP) Grant Application (Grant Writer)
FIRM
HDR

EDUCATION
MS, Civil Engineering
BS, Civil Engineering

REGISTRATIONS
EIT, CA 163559

YEARS OF

EXPERIENCE
6 YEARS WITH FIRM
1 Annie has over 6 years of experience in roadway design and utility coordination. She is proficient in MicroStation and InRoads and is knowledgeable in Caltrans standards, procedures, and plans. • LA Metro, I-405 Auxiliary Lanes Improvement Project PS&E (Highway EIT) • City of Long Beach, Shoemaker Bridge Replacement PA&ED and PS&E (Highway EIT)
• LA Metro, SR-57/SR-60 Interchange Improvement Project PS&E (Highway EIT)
Annie Nguyen, EIT
M. Prior Rights Expertise Support
RES-35
City of Pico Rivera, On-Call Engineering Services
K. Resumes
350 S Grand Ave. Suite 2900
Los Angeles, CA 90071
hdrinc.com
We practice increased use of sustainable
materials and reduction of material use.
© 2024 HDR, Inc., all rights reserved.

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)
RATES-01
H. SCHEDULE OF HOURLY RATES
City of Pico Rivera, On-Call Engineering Services
H. Schedule of Hourly Rates
Prevailing Wage assignments will be charged based on the State of California Department of Industrial Relations (DIR). For Scope of Services subject to Prevailing Wage, the hourly pay, including overtime; weekend; holiday; travel and subsistence; and shift provisions is to follow DIR Prevailing Wage. Please refer to the DIR website: https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html

Page 1 of 4 ends

02/14/2024

SCHEDULE OF HOURLY RATES FOR CITY OF PICO RIVERA ON-CALL ENGINEERING SERVICES Prime Firm: HDR Engineering, Inc.

Subconsultant Firm: ---
Classification Hourly Rate
Principal-in-Charge $477.00
Senior Project Manager $460.00
Sr. Technical Advisor $438.00
Project Manager $405.00
Technical Advisor $466.00
Sr. Task Manager $412.00
Sr. Task Manager - Structures $392.00
Sr. Task Manager - Traffic $399.00
Task Manager $355.00
Senior Engineer $318.00
CADD/BIM Task Lead $318.00
Sr. Project Administrator $318.00
Quality Manager $305.00
Sr. Task Lead $286.00
Sr. Task Lead - Environmental $308.00
Sr. Traffic Engineer $298.00
Environmental III $251.00
Sr. Project Engineer/Planner/ Architect/ Geotech $251.00 Engineer III $239.00
CADD/BIM Specialist III $234.00
Traffic Engineer III $227.00
Environmental II $217.00
Project Engineer/ Planner/ Architect/ Geotech $212.00
Sr Project Accountant $198.00
Sr. Landscape Architect $210.00
CADD/BIM Specialist II $186.00
Task Lead $180.00
Engineer II $177.00
Traffic Engineer II $176.00
CADD/BIM Specialist I $167.00
Environmental I $154.00
Designer $151.00
Project Accountant $148.00
Traffic Engineer I $151.00
Engineer I $135.00
Project Administrator II $118.00
Project Administrator I $101.00
RATES-02

Page 2 of 4 ends

Subconsultant Firm: Amheart Solutions
Classification Hourly Rate
Civil Designer I $101.84
Civil Designer II $113.15
Civil Designer III $124.47
Civil Engineer I $135.78
Civil Engineer II $147.10
Subconsultant Firm: Arellano Associates, LLC
Classification Hourly Rate
Project Manager $221.03
Deputy Project Manager $179.06
Creative Lead $179.06
Senior Project Coordinator $151.08
Media Lead $151.08
Project Coordinator $109.11
Creative Coordinator $109.11
Assistant Project Coordinator $78.34
Subconsultant Firm: Geo-Advantec, Inc.

Classification Hourly Rate
Principal Geotechnical Engineer $250.00
Principal Engineering Geologist $250.00
Senior Project Engineer $200.00
Staff Engineer $150.00
GIS Technician $150.00
Laboratory Manager $125.00
Drafter/CAD Technician $90.00
Senior Engineer/Registered Geotechnical
Engineer
$200.00
Senior Field Engineer/Field Operation Manager $150.00
Senior Lab Technician $110.00
Senior Field Technician $150.00
Subconsultant Firm: GPA Consulting
Classification Hourly Rate
Principal Environmental Planner $363.00
Senior Associate Environmental Planner $289.00
Senior Environmental Planner $210.00
Associate Environmental Planner $142.00
Environmental Planner $116.00
Senior Associate Biologist $247.00
RATES-03
City of Pico Rivera, On-Call Engineering Services
H. Schedule of Hourly Rates

Page 3 of 4 ends

Senior Biologist $200.00
Associate Biologist $142.00
Biologist $116.00
Principal Architectural Historian $331.00
Senior Associate Architectural Historian $221.00
Senior Architectural Historian $184.00
Associate Architectural Historian $147.00
Architectural Historian II $116.00
Architectural Historian I $105.00
Senior GIS Analyst $189.00
Project Coordinator $132.00
Administrative Assistant $84.00
Intern $69.00
Subconsultant Firm: Guida Surveying, Inc.

Classification Hourly Rate
Survey Principal $335.00
Senior Survey Project Manager $300.00
Survey Project Manager $265.00
Senior Project Surveyor $250.00
Project Surveyor $230.00
Senior Survey Analyst $205.00
Survey Analyst $150.00
Survey Technician $155.00
Survey Project Coordinator $155.00
Survey Intern $120.00
1-Person Survey Crew** $270.00
2-Person Survey Crew** $430.00
3-Person Survey Crew** $580.00
**Denotes Classifications subject to prevailing wage
Subconsultant Firm: Kroner Environmental Services, Inc.

Classification Hourly Rate
Senior Level Professional $250.00
Mid Level Professional $195.00
Junior Level Professional $165.00
Technician $135.00
Operating Engineer $145.00
Laborer $125.00
Administrator $100.00
RATES-04

Page 4 of 4 ends

Subconsultant Firm: Suenram and Associates, Inc.

Classification Hourly Rate
Principal Utility Lead $211.26
Utility Task Lead $158.10
Utility Engineer III $117.94
Utility Engineer II $98.95
Utility Engineer I $88.31
Subconsultant Firm: Tatsumi and Partners, Inc.

Classification Hourly Rate
Senior Principal $ 265.00
Senior Associate $ 178.00
Senior Designer $ 151.00
Task Leader $ 127.00
Technical Staff III $ 116.00
Technical Staff II $ 105.00
Technical Staff I $ 79.00
Subconsultant Firm: V&A, Inc.

Classification Hourly Rate
Project Manager $249.60
Senior Project Engineer $212.16
CADD Manager $156.00

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND

WILLDAN ENGINEEERING

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and Willdan Engineering, (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call engineering services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : April 23, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 2
13b
Professional Services Agreement

WILLDAN ENGINEERING

Page 2 of 14 ends

5. CONSULTANT’S SERVICES

5.1 Consultant shall perform the services identified in the Scope of Services. City shall have the right to request, in writing, changes in the Scope of Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement. In no event shall the total compensation and costs payable to Consultant under this Agreement exceed the sum of Two Million Five Hundred Thousand Dollars ($2,500,000.00), unless specifically approved in advance, in writing, by City.

5.2 Consultant shall perform all work to the highest professional standards of Consultant’s profession and in a manner reasonably satisfactory to City.

6. COMPENSATION

6.1 City agrees to compensate Consultant for the services provided under this Agreement, and Consultant agrees to accept in full satisfaction for such services, payment in accordance with the Approved Fee Schedule.

6.2 Consultant shall submit to City an invoice, on a monthly basis or less frequently, for the services performed pursuant to this Agreement. Each invoice shall itemize the services rendered during the billing period and the amount due. Within ten (10) business days of receipt of each invoice, City shall notify Consultant in writing of any disputed amounts included on the invoice. Within thirty (30) calendar days of receipt of each invoice, City shall pay all undisputed amounts included on the invoice. City shall not withhold applicable taxes or other authorized deductions from payments made to Consultant.

6.3 Payments for any services requested in writing by City and not included in the Scope of Services shall be made to Consultant by City on a time-and-materials basis using Consultant’s standard fee schedule. Fees for such additional services shall be paid within sixty (60) days of the date Consultant issues an invoice to City for such services.

7. BUSINESS LICENSE
Consultant shall obtain a City of Pico Rivera business license prior to commencing performance under this Agreement.

8. COMPLIANCE WITH LAWS
Consultant shall keep informed of State, Federal and Local laws, ordinances, codes and regulations that in any manner affect those employed by it or in any way affect the performance of its services pursuant to this Agreement. Consultant shall at all times comply with such laws, ordinances, codes and regulations. Without limiting the generality Professional Services Agreement

WILLDAN ENGINEERING

Page 3 of 14 ends

of the foregoing, if Consultant is an out-of-state corporation or LLC, it must be qualified and registered to do business in the State of California pursuant to sections 2105 and 17708.02 of the California Corporations Code. The City, its officers and employees shall not be liable at law or in equity occasioned by failure of Consultant to comply with this Section.

9. CONFLICT OF INTEREST
Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the services to be performed by Consultant under this Agreement, or which would conflict in any manner with the performance of its services hereunder. During the term of this Agreement, Consultant shall not perform any work for another person or entity for whom Consultant was not working at the Commencement Date of this Agreement if both: (i) such work would require Consultant to abstain from a decision under this Agreement pursuant to a conflict of interest statute; and (ii) City has not consented in writing prior to Consultant’s performance of such work.

10. PERSONNEL
Consultant represents that it has, or will secure at its own expense, all personnel required to perform the services identified in the Scope of Services. All such services shall be performed by Consultant or under its supervision, and all personnel engaged in the work shall be qualified to perform such services. Consultant reserves the right to determine the assignment of its own employees to the performance of Consultant’s services under this Agreement, but City reserves the right, for good cause, to require Consultant to exclude any employee from performing services on City’s premises. Tyrone Peter, Project Manager, shall be Consultant’s project administrator and shall have direct responsibility for management of Consultant’s performance under this Agreement. No change shall be made to Consultant’s project administrator without City’s prior written consent.

11. OWNERSHIP OF WRITTEN PRODUCTS
All reports, documents or other written material (“written products”) developed by Consultant in the performance of this Agreement shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Consultant may take and retain copies of such written products as desired, but no such written products shall be the subject of a copyright application by Consultant. If any state, federal, or local law requires mandatory copyright protection for Consultant’s work product, City shall comply with such laws to the extent feasible.

Professional Services Agreement

WILLDAN ENGINEERING

Page 4 of 14 ends

12. INDEPENDENT CONTRACTOR

12.1 Consultant is, and shall at all times remain as to City, a wholly independent .

Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise to act on behalf of City as an agent. Neither City nor any of its officers, employees or agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not at any time represent that it is, or that any of its agents or employees are, in any manner employees of City.

12.2 The Parties further acknowledge and agree that nothing in this Agreement shall create or be construed to create a partnership, joint venture, employment relationship, joint-employer relationship, or any other relationship between Consultant or Consultant’s employees except as set forth in this Agreement.

12.3 City shall have no direct or indirect control over Consultant’s employees or sub-consultants with respect to wages, hours, and working conditions. In addition, City shall not deduct from the Compensation paid to Consultant any sums required for Social Security, withholding taxes, FICA, state disability insurance or any other federal, state or local tax or charge which may or may not be in effect or hereinafter enacted or required as a charge or withholding on the compensation paid to Consultant, Consultant’s employees or subconsultants. City shall have no responsibility to provide Consultant, its employees or subconsultants with workers’ compensation insurance or any other insurance.

12.4 The Parties further acknowledges the following: (i) that Consultant shall provide the services outlined in the Scope of Services directly to City; (ii) Consultant maintains a business location at the address listed under Section 20 that is separate and distinct from the City; (iii) Consultant contracts with other businesses to provide the same or similar services and maintains a clientele without restriction from the City; (iv) Consultant advertises and holds itself out to the public as available to provide the same or similar services; (v) unless otherwise specified in this Agreement, Consultant provides its own tools, vehicles, and equipment necessary for performing the Scope of Services; (vi) Consultant has proposed and negotiated its own rates; and (vii) consistent with the nature and demands of the project and the City’s business hours, Consultant may set its own hours and location of work.

13. CONFIDENTIALITY
All data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Consultant without prior written consent by City. City shall grant such consent if disclosure is legally required. Upon request, all City data and any copies thereof shall be returned to City upon the termination or expiration of this Agreement.

Professional Services Agreement

WILLDAN ENGINEERING

Page 5 of 14 ends

14. NON-LIABILITY OF CITY OFFICIALS AND EMPLOYEES
No official or employee of the City shall be personally liable to Consultant in the event of any default or breach by City, or for any amount which may become due to Consultant.

15. INDEMNIFICATION

15.1 The Parties agree that City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys’ fees, litigation costs, or any other cost arising out of or in any way related to the performance of this Agreement. Accordingly, the provisions of this indemnity provision are intended by the Parties to be interpreted and construed to provide the fullest protection possible under the law to City. Consultant acknowledges that City would not enter into this Agreement in the absence of Consultant’s commitment to indemnify and protect City as set forth herein. Notwithstanding the foregoing, to the extent Consultant's services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.2 To the full extent permitted by law, Consultant shall indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant or any of its officers, employees, servants, agents, or subconsultants in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees. Notwithstanding the foregoing, to the extent Consultant's Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.

15.3 City shall have the right to offset against the amount of any compensation due Consultant under this Agreement any amount due to City from Consultant as a result of Consultant’s failure to pay City promptly any indemnification arising under this Section 15 or related to Consultant’s failure to either: (i) pay taxes on amounts received pursuant to this Agreement or (ii) comply with applicable workers’ compensation laws.

15.4 The obligations of Consultant under this Section 15 will not be limited by the provisions of any workers’ compensation act or similar act. Consultant expressly waives Professional Services Agreement

WILLDAN ENGINEERING

Page 6 of 14 ends

its statutory immunity under such statutes or laws as to City, its officers, agents, employees and volunteers.

15.5 Consultant agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section 15 from each and every subconsultant or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. In the event Consultant fails to obtain such indemnity obligations from others as required herein, Consultant agrees to be fully responsible and indemnify, hold harmless and defend City, its officers, agents, elected and appointed officials, employees, affiliated public agencies and volunteers from and against any and all claims, demands, lawsuits, causes of action, losses, costs or expenses for any damage due to death or injury to any person and injury to any property resulting from or arising out of any alleged intentional, reckless, negligent, or otherwise wrongful acts, errors or omissions of Consultant’s subconsultants or any other person or entity involved by, for, with or on behalf of Consultant in the performance of this Agreement. Such costs and expenses shall include reasonable attorneys’ fees incurred by counsel of City’s choice and expert witness fees and consultant fees.

15.6 City does not, and shall not, waive any rights that it may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. This hold harmless and indemnification provision shall apply regardless of whether or not any insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost or expense.

15.7 PERS ELIGIBILITY INDEMNITY. In the event that Consultant or any employee, agent, or subconsultant of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subconsultants, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, Consultant and any of its employees, agents, and subconsultants providing service under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Professional Services Agreement

WILLDAN ENGINEERING

Page 7 of 14 ends

16. INSURANCE

16.1 During the term of this Agreement, Consultant shall carry, maintain, and keep in full force and effect insurance against claims for death or injuries to persons or damages to property that may arise from or in connection with Consultant’s performance of this Agreement. Such insurance shall be of the types and in the amounts as set forth below:

16.1.1 Comprehensive general liability, and Umbrella or Excess Liability Insurance covering all operations by or on behalf of Consultant providing insurance for bodily injury liability and property damage liability for the following and including coverage for:

16.1.1.1 Premises, operations, and mobile equipment

16.1.1.2 Products and completed operations

16.1.1.3 Broad form property damage (including completed operations)

16.1.1.4 Explosion, collapse, and underground hazards

16.1.1.5 Personal Injury

16.1.1.6 Contractual liability
in the amount of One Million Dollars ($1,000,000) per occurrence combined single limit; Two Million Dollars ($2,000,000) aggregate for products/completed operation; Two Million Dollars ($2,000,000) general aggregate (General aggregate must apply separately to Consultant’s work under this Agreement.); and Five Million Dollars ($5,000,000) umbrella or excess liability.

16.1.2 Automobile Liability Insurance for owned, hired and non-owned vehicles utilized by Consultant, its employees or subconsultants, in the amount of One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

16.1.3 Worker’s Compensation Insurance as required by the laws of the State of California, with Statutory Limits, and Employer's Liability Insurance with limit of no less than One Million Dollars ($1,000,000) per accident for bodily injury or disease.

16.1.4 Professional Liability Insurance against errors and omissions in the performance of the work under this Agreement with coverage limits of not less than One Million Dollars ($1,000,000) per occurrence of claim/ Two Million Dollars ($2,000,000) in the aggregate.

Professional Services Agreement

WILLDAN ENGINEERING

Page 8 of 14 ends

16.2 Consultant shall require each of its subconsultants, if any, to maintain insurance coverage that meets all of the requirements of this Agreement.

16.3 The policy or policies required by this Agreement shall be issued by an insurer admitted in the State of California and with a rating of at least A:VII in the latest edition of Best’s Insurance Guide.

16.4 Consultant agrees that if it does not keep the aforesaid insurance in full force and effect City may either: (i) immediately terminate this Agreement; or (ii) take out the necessary insurance and pay, at Consultant’s expense, the premium thereon.

16.5 At all times during the term of this Agreement, Consultant shall maintain on file with City’s Risk Manager a certificate or certificates of insurance showing that the aforesaid policies are in effect in the required amounts and, for the general liability and automobile liability policies, naming the City as an additional insured. Consultant shall, prior to commencement of work under this Agreement, file with City’s Risk Manager such certificate(s).

16.6 Consultant shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Consultant shall provide such proof to City at least two weeks prior to the expiration of the coverages.

16.7 The general liability and automobile policies of insurance required by this Agreement shall contain an endorsement naming City, its officers, employees, agents and volunteers as additional insureds. All of the policies required under this Agreement shall contain an endorsement providing that the policies cannot be canceled or reduced except on thirty days’ prior written notice to City. Consultant agrees to require its insurer to modify the certificates of insurance to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word “endeavor” with regard to any notice provisions.

16.8 The general liability and automobile policies of insurance provided by Consultant shall be primary to any coverage available to City. Any insurance or selfinsurance maintained by City, its officers, employees, agents or volunteers, shall be in excess of Consultant’s insurance and shall not contribute with it.

16.9 All insurance coverage provided pursuant to this Agreement shall not prohibit Consultant, and Consultant’s employees, agents or subconsultants, from waiving the right of subrogation prior to a loss. Consultant hereby waives all rights of subrogation against the City.

16.10 Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of City, Consultant shall either reduce or eliminate the deductibles or self-insured retentions with respect to City, or Consultant shall procure a bond guaranteeing payment of losses and expenses.

Professional Services Agreement

WILLDAN ENGINEERING

Page 9 of 14 ends

16.11 Procurement of insurance by Consultant shall not be construed as a limitation of Consultant’s liability or as full performance of Consultant’s duties to indemnify, hold harmless and defend under Section 15 of this Agreement.

16.12 If Consultant maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

17. MUTUAL COOPERATION

17.1 City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available to City for the proper performance of Consultant’s services under this Agreement.

17.2 In the event any claim or action is brought against City relating to Consultant’s performance in connection with this Agreement, Consultant shall render any reasonable assistance that City may require.

18. RECORDS AND INSPECTIONS
Consultant shall maintain full and accurate records with respect to all matters covered under this Agreement for a period of three years after the expiration or termination of this Agreement. City shall have the right to access and examine such records, without charge, during normal business hours. City shall further have the right to audit such records, to make transcripts therefrom and to inspect all program data, documents, proceedings, and activities.

19. PERMITS AND APPROVALS
Consultant shall obtain, at its sole cost and expense, all permits and regulatory approvals necessary in the performance of this Agreement. This includes, but shall not be limited to, encroachment permits and building and safety permits and inspections.

20. NOTICES
Any notices, bills, invoices, or reports required by this Agreement shall be deemed received on: (i) the day of delivery if delivered by hand, facsimile, email, or overnight courier service during Consultant’s and City’s regular business hours; or (ii) on the third business day following deposit in the United States mail if delivered by mail, postage prepaid, to the addresses listed below (or to such other addresses as the Parties may, from time to time, designate in writing).

Professional Services Agreement

WILLDAN ENGINEERING

Page 10 of 14 ends

If to City: If to Consultant:

Steve Carmona, City Manager
City of Pico Rivera
PO Box 1016
6615 Passons Blvd.

Pico Rivera, California 90660-1016
Vanessa Munoz, President and
Director of Engineering
Willdan Engineering
13191 Crossroads Pkwy North,
Suite 405
Industry, CA 91746
With a courtesy copy to:

Arnold M. Alvarez-Glasman, City Attorney
13181 Crossroads Parkway North
Suite 400 - West Tower
City of Industry, CA 91746

21. SURVIVING COVENANTS
The Parties agree that the covenants contained in Sections 13, 15 and Paragraph

17.2 of Section 17, of this Agreement shall survive the expiration or termination of this Agreement.

22. TERMINATION

22.1 City shall have the right to terminate this Agreement for any reason on five (5) calendar days’ written notice to Consultant. Consultant shall have the right to terminate this Agreement for any reason on sixty (60) calendar days’ written notice to City. The effective date of termination shall be upon the date specified in the notice of termination.

Consultant agrees that in the event of such termination, City’s obligation to pay Consultant shall be limited to payment only for those services satisfactorily rendered, as solely determined by the City, prior to the effective date of termination. Consultant agrees to cease all work under this Agreement on or before the effective date of any notice of termination. All City data, documents, objects, materials or other tangible things shall be returned to City upon the termination or expiration of this Agreement.

22.2 If City terminates this Agreement due to no fault or failure of performance by Consultant, then Consultant shall be paid based on the work satisfactorily performed, as solely determined by the City, at the time of termination. In no event shall Consultant be entitled to receive more than the amount that would be paid to Consultant for the full performance of the services required by this Agreement.

23. ASSIGNMENT
Consultant shall not delegate, transfer, subcontract or assign its duties or rights hereunder, either in whole or in part, without City’s prior written consent, and any attempt Professional Services Agreement

WILLDAN ENGINEERING

Page 11 of 14 ends

to do so shall be void and of no effect. City shall not be obligated or liable under this Agreement to any Party other than Consultant.

24. NON-DISCRIMINATION AND EQUAL EMPLOYMENT OPPORTUNITY

24.1 In the performance of this Agreement, Consultant shall not discriminate against any employee, subconsultant, or employment applicant because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation. Consultant will take affirmative action to ensure that subconsultants, employees, and employment applicants are treated without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.2 Consultant will, in all solicitations or advertisements for employees placed by or on behalf of Consultant state either that it is an equal opportunity employer or that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition or sexual orientation.

24.3 Consultant will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Agreement except contracts or subcontracts for standard commercial supplies or raw materials.

25. WARRANTIES

25.1 Each Party has received independent legal advice from its attorneys with respect to the advisability of entering into and executing this Agreement, or been provided with an opportunity to receive independent legal advice and has freely and voluntarily waived and relinquished the right to do so. Each Party who has not obtained independent counsel acknowledges that the failure to have independent legal counsel will not excuse such Party’s failure to perform under this Agreement.

25.2 In executing this Agreement, each Party has carefully read this Agreement, knows the contents thereof, and has relied solely on the statements expressly set forth herein and has placed no reliance whatsoever on any statement, representation, or promise of any other party, or any other person or entity, not expressly set forth herein, nor upon the failure of any other party or any other person or entity to make any statement, representation or disclosure of any matter whatsoever.

25.3 It is agreed that each Party has the full right and authority to enter into this Agreement, and that the person executing this Agreement on behalf of either Party has the full right and authority to fully commit and bind such Party to the provisions of this Agreement.

Professional Services Agreement

WILLDAN ENGINEERING

Page 12 of 14 ends

26. CAPTIONS

26.1 The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and for convenience in reference to this Agreement. Should there be any conflict between such heading, and the section or paragraph thereof at the head of which it appears, the section or paragraph thereof, as the case may be, and not such heading, shall control and govern in the construction of this Agreement.

26.2 Masculine or feminine pronouns shall be substituted for the neuter form and vice versa, and the plural shall be substituted for the singular form and vice versa, in any place or places herein in which the context requires such substitution(s).

27. NON-WAIVER

27.1 The waiver by City or Consultant of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Consultant unless in writing.

27.2 Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any Party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such Party of any of all of such other rights, powers or remedies.

27.3 Consultant shall not be liable for any failure to perform if Consultant presents acceptable evidence, in City’s sole judgment, that such failure was due to causes beyond the control and without the fault or negligence of Consultant.

28. COURT COSTS AND ATTORNEY FEES
In the event legal action shall be necessary to enforce any term, covenant or condition herein contained, the Party prevailing in such action, whether reduced to judgment or not, shall be entitled to its reasonable court costs, including accountants’ fees and expert witness fees, if any, and attorneys’ fees expended in such action. The venue for any litigation shall be Los Angeles County, California.

Professional Services Agreement

WILLDAN ENGINEERING

Page 13 of 14 ends

29. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

30. GOVERNING LAW
This Agreement shall be governed and construed in accordance with the laws of the State of California.

31. COUNTERPARTS
This Agreement may be signed in any one or more counterparts all of which taken together shall be but one and the same Agreement. Any signed copy of this Agreement or of any other document or agreement referred to herein, or copy or counterpart thereof, delivered by facsimile or email transmission, shall for all purposes be treated as if it were delivered containing an original manual signature of the Party whose signature appears in the facsimile or email and shall be binding upon such Party in the same manner as though an originally signed copy had been delivered.

32. ENTIRE AGREEMENT
All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. This instrument contains the entire Agreement between City and Consultant with respect to the transactions contemplated herein. No other prior oral or written agreements are binding upon the Parties.

Amendments hereto or deviations herefrom shall be effective and binding only if made in writing and executed by City and Consultant.
[This section intentionally left blank]
Professional Services Agreement

WILLDAN ENGINEERING

Page 14 of 14 ends

TO EFFECTUATE THIS AGREEMENT, the Parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. “CITY” “CONSULTANT”

CITY OF PICO RIVERA WILLDAN ENGINEERING
______________________________ ___________________________________ Andrew C. Lara, Mayor Vanessa Munoz, President and
Director of Engineering
Dated: ________________________ Dated: _____________________________ ATTEST: APPROVED AS TO FORM:
___________________________ ___________________________________ Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney

EXHIBIT A

SCOPE OF SERVICES

DEPARTMENT OF PUBLIC WORKS

CITY OF PICO RIVERA
Proposal for
February 14, 2024

ON-CALL ENGINEERING

SERVICES
A. Letter of Offer
February 14, 2024
Noe Negrete, P.E.

Director of Public Works
City of Pico Rivera
6615 Passons Blvd.

Pico Rivera, CA 90670-3658
Subject: Proposal for On-Call Engineering Services
The City of Pico Rivera is seeking on-call engineering consultants to provide the City with professional oncall engineering services including the planning and design of roadway and transportation projects, water treatment and distribution systems, sewer systems, flood control and storm drain facilities, parks/playgrounds/trails, and other Public Works construction projects – as well as specialty services including but not limited to grant administration, public outreach, preliminary engineering studies, environmental studies, right-of-way acquisition, geotechnical and multi-discipline support services, and prior rights claim expertise.

Willdan Engineering (Willdan) has a renowned “extension of staff” services delivery model and can provide the City with a project team that excels in the necessary disciplines to complete any project awarded under this on-call contract. Client satisfaction is our number one goal. As a multidisciplinary firm, Willdan offers a full complement of in-house staffing resources that enable us to continue to provide all services requested in the City's Request for Proposals along with a complete range of services to fulfill other City needs that may arise during the on-call engineering services contract. Specifically, Willdan brings superior technical and management expertise and enthusiasm to assist the City in achieving the goals of its Historic Whittier Boulevard Revitalization Program, transforming the site into an engaging, vibrant, and safe environment where all community members thrive. Willdan's team also offers:

Knowledge of the City of Pico Rivera. Our work with the City began in 1983 and has continued to this day, spanning over 40 years of service – 81 Design Engineering projects, 17 Construction Management projects, 11 Planning projects and 5 City Engineering contracts. We have provided planning, city engineering, building official, survey/topography, construction observation, traffic studies, plan checking, geotechnical observation and labor compliance on numerous projects throughout the City. Recent projects include the 2023 Slurry Seal CM/Inspection, Youth Center Renovations Project No. 50100, Golf Course Fire Damage Repairs CIP 21345, Beverly Blvd and San Gabriel Parkway Median, Regional Bikeway CIP No 21280 ATPL 5351(032), Citywide Major Streets 50047, 50048, 50066, 50067 Senior Center Tenant Improvements - CIP No 50036, Emergency Storm Drain, and Mines Ave Pavement Coring & Testing. Willdan knows the City of Pico Rivera and their development requirements and needs, allowing us to provide exceptional services to the City to meet their specific needs. Willdan continues to ensure the City receives exemplary services and maintains our Client-First philosophy to keep the City’s goals and standards at the forefront of our mission.

Key Personnel with Award-Winning Engineering Accomplishments. Project Manager Tyrone Peter, PE has provided leadership on over 400 complex multidiscipline, multiagency infrastructure improvement projects in California, as engineering project manager, civil engineering task manager, and supervising engineer. An 18-year veteran of the design engineering field, he has acquired comprehensive public works experience -- including the 17 projects he has successfully managed or designed for the City to date – in the project management, design, and construction support of civil infrastructure, traffic, reconstruction, rehabilitation, landscape architecture, utility relocation, ADA, drainage, and wastewater projects. He works with many public agencies providing engineering services within Los Angeles, Orange, Riverside, San Bernardino, Fresno, and Northern California counties. This extensive experience ranges from feasibility studies to developing final construction documents and is invaluable in providing the needed perspectives for assisting the City of Pico Rivera with the delivery of the requested on-call services.

Deputy Project Manager Jeffrey Lau, PE, TE, ENV SP has 20 years of accomplishments on large, multidiscipline, multi-agency traffic and transportation projects, including having served as Traffic Task Lead on 24 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract. Jeff has managed design projects for over 100 cities and counties throughout California including Los Angeles and Inglewood. He has recently completed the Traffic Signal Communication Plans for the LAWA ITS Improvement Project at various locations throughout the city including the surrounding LAX roadway network at Century Boulevard from La Cienega Boulevard to Van Ness Avenue and La Cienega Boulevard from Florence Avenue to Century Boulevard. He possesses expertise in overseeing the preparation of plans, specifications, and estimates for traffic signal, signing and striping, and street lighting design projects.

Vanessa Muñoz, PE, TE is President of Willdan Engineering and will serve as the Principal-in-Charge and Quality Assurance Manager for all projects. She has overseen over 200 on-call contracts and served as project manager, principal, and quality lead for the successful completion of 2,000+ traffic and transportation projects, designed more than 1,000 new and modified traffic signal installations, and routinely supervises over 50 engineers and technicians for all types of municipal and transportation projects. Vanessa has served as Project Manager or Traffic Engineer on 29 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract.

Grant Writing and Management. As an added value to the City, Willdan offers an excellent track record pursuing and securing state/federal funding for various cities and counties. Willdan has been awarded $100M+ in funding and obtained $.5B for our municipal clients. Recently, Caltrans released their list of project grant applications selected for HSIP Cycle 11 funding. Willdan achieved a 93% success rate for this cycle, successfully obtained funding for 13 of the 14 applications submitted for our clients, totaling $6,500,000. 60-Year Track Record. Willdan has extensive experience providing a complete range of engineering services to local agencies on an as-needed and project-specific- basis. We provide services in all phases of project development, including site analysis and conceptual development, preliminary and final design, and construction management and inspection. Our services involve environmental planning, facility financing, and state-of-the-art computer-aided design. We have direct experience with county, state, and federal processes, regulations, and requirements.

As President of Willdan Engineering, I am authorized to bind Willdan to the terms of the City’s RFP and to make representations and negotiate on behalf of the firm. Our proposal shall remain valid for a period of not less than 90 calendar days from the date of submittal. I attest that all information submitted with the Proposal is true and correct. We acknowledge that Willdan is aware of/obligated by all addenda to this RFP, if any.

Consulting Firm Contact Person
Willdan Engineering
Corporate Headquarters
2401 E. Katella Avenue, Suite 300
Anaheim, CA 92806
Phone: 714.940.6300
www.willdan.com
Federal ID Number: 95-2295858
Vanessa Muñoz, PE, TE
Willdan Engineering
13191 Crossroads Parkway North, Suite 405
Industry, CA 91746
562.368.4848 O
562.447.6844 M
[email protected].

We thank the City of Pico Rivera for the opportunity to submit our proposal for On-Call Engineering Services.

We are excited about the opportunity to continue our partnership with the City of Pico Rivera and look forward to discussing our qualifications further.

Respectfully submitted,

WILLDAN
Vanessa Munoz, PE, TE, President and CEO
Proposal for On-Call Engineering Services i
 Table of Contents
A. Letter of Offer............................................................................................................................................0 B. Qualifications of the Firm...........................................................................................................................1 Firm Profile.................................................................................................................................................1 City of Pico Rivera Experience...................................................................................................................2 Capability, Availability, Current Workload and Proven Record of Meeting Schedules on Similar Types of Projects......................................................................................................................................................3 Similar Experience .....................................................................................................................................3 Qualifications in the City’s Scope of Work..................................................................................................4 Civil Engineering ....................................................................................................................................5 Drainage Design/Studies........................................................................................................................5 Traffic Design/Studies ............................................................................................................................5 Water Resources Design Services.........................................................................................................6 Utility Coordination .................................................................................................................................6 Environmental Documentation Services.................................................................................................7 Landscape Architecture..........................................................................................................................7 Survey, Mapping and Right-of-Way Engineering....................................................................................7 Geotechnical Engineering ......................................................................................................................7 Utility Investigation and Locating............................................................................................................8 Construction Management and Inspection ........................................................................................... 11 Labor Compliance Management and Oversight ................................................................................... 12 Materials Engineering Services............................................................................................................ 12 C. Proposed Staffing.................................................................................................................................... 12 Organizational Chart ................................................................................................................................ 12 Project Management Team...................................................................................................................... 14 Key Staff Qualifications............................................................................................................................ 14 Key Personnel Matrix/Resumes............................................................................................................... 14 D. Consultants and/or Sub-consultants ...................................................................................................... 21 E. Work Approach........................................................................................................................................ 21 Management Approach............................................................................................................................ 21 Technical Approach ................................................................................................................................. 23 Quality Assurance and Control ................................................................................................................ 24 F. Client References................................................................................................................................... 25 G. Rights to Materials ................................................................................................................................ 30 H. Schedule of Hourly Rates .........................................................................................................................0

APPENDIX

RESUMES

REQUIRED FORMS AND STATEMENTS

Proposal for On-Call Engineering Services 1
B. Qualifications of the Firm
Firm Profile
Willdan Engineering, a California corporation since 1964, is a subsidiary of Willdan Group, Inc., a publicly traded Delaware corporation. Services are provided to nationwide clientele through three subsidiary firms – Willdan Engineering, Willdan Energy Solutions, and Willdan Financial Services – that offer a portfolio of diversified strengths. Throughout our history, Willdan Engineering (Willdan) has served as a full-service, multi-disciplinary firm specializing in building safety, municipal engineering, planning, and construction management and inspection services along with a full complement of support disciplines.

Willdan's corporate-wide staffing resources have grown from 637 in 2014 to over 1,600 employees in 56+ offices nationwide. Our corporate headquarters is located at 2401 East Katella Avenue, Suite 300 in Anaheim, California. Our City of Industry office will be the primary office for execution of this service; however, technical staff may be pulled from any office as needed. The firm's size and organization enable staff to efficiently communicate individual project challenges and goals companywide, thus capitalizing on all Willdan's resources to deliver the highest quality and most costeffective product. Location information for all our offices can be found on our website.

Willdan has served as a full-service, multidisciplinary firm specializing in municipal engineering and planning
services along with a full complement of support disciplines necessary for a sustainable project. Our services and inhouse support disciplines encompass traffic, civil, structural, geotechnical, right-of-way, city, and special district engineering; urban and regional planning;
program/construction management and inspection; plan,
study, and report review; building safety; drainage and flood control; mapping; and other appurtenant services
such as GIS, utility coordination and relocation, and
landscape architecture.

With this depth of experience, expertise, knowledge, and resources, Willdan offers comprehensive solutions that are timely, cost effective, and tailored to meet the needs of individual communities. Our understanding of public agency challenges and needs is what makes Willdan unique.

Financial Stability
Throughout our 60 years in business, Willdan has maintained a strong balance sheet with the financial and staffing resources to perform and complete all contractual obligations. We have continued to grow to better serve our clients by offering an expanding range of municipal services. Financial information, including information on revenue, earnings, and cash flow, are issued quarterly, and can be found at www.willdan.com.

There are no pending conditions such as bankruptcy, pending litigation, outstanding claims in excess of Proposal for On-Call Engineering Services 2
twenty-five thousand dollars ($25,000) for or against the firm; planned office closure, impending merger, etc., that would impede Willdan's ability to provide on-call engineering and professional consulting services.

Corporate Mission and Philosophy
From Day 1, Willdan has maintained a business strategy focused on providing services to only public agencies. Today, 98 percent of our business is with public agencies. This strategy prevents potential conflicts of interest with private enterprises conducting business with our public agency clients or within their jurisdiction. Willdan infuses our corporate culture of Customer-First throughout our entire staffing resources and all services provided.

Extension of Staff
Willdan has provided a full spectrum of professional engineering services that includes design engineering, city and traffic engineering, planning, transportation, building and safety, and construction management and inspection services to over 300 agencies, including jurisdictions, tribal communities, cities, and counties. We have highly trained, experienced staff to complete or enhance local agency staffing and meet their staffing requirements for permanent and/or interim staff on a full- or part-time basis. With over 75 licensed professional and technical personnel, Willdan offers dedicated, qualified staff with many of our skilled staff holding municipal positions prior to joining Willdan. Their specialized experience provides jurisdictions throughout California with efficient, cost-effective staffing assistance to maintain or expand departmental services and capabilities.

City of Pico Rivera Experience
Willdan currently provides design engineering, code enforcement staff, geotechnical engineering, and construction observation and testing to the City of Pico Rivera. Our work with the City began in 1983 and has continued to this day, spanning over 40 years of service. We have provided planning, city engineering, building official, survey/topography, construction observation, traffic studies, plan checking, geotechnical observation and labor compliance on numerous projects throughout the City. Willdan knows the City of Pico Rivera and their development requirements and needs, allowing us to provide exceptional services to the City to meet their specific needs. Below are a few examples of projects we’ve completed:
 Long Beach Boulevard Curb Ramps
 Pico Rivera Urban Bike Trail
o Active, Healthy and Safe Communities
Award Winner
o APWA B.E.S.T Award Winner
 Sewer System Management Plan Update
 Fernwood Avenue Park
 Pico Rivera Construction Inspection- Street Light
Retrofit
 Citywide Sidewalk Transition and CIP
 Burke/Ham Playground
 ATP Cycle 5 Grant Application
 Martin Luther King at Bullis Traffic Signal Modification  Parking Lot Rehabilitation
 City Hall Construction Monitoring
 On-Call Energy Manager Support Services
 Beechwood at Shirley Traffic Study
 On-Call Planning Services
 Wright Road Pavement Rehabilitation
 PFAS Treatment System CM/Inspection
 ADA City Hall CM
 City Hall EV Charging
 Whittier Underpass Repair
 Underpass Drainage Passons, Rosemead &
Paramount and Two Pump Stations
 Telegraph Road Over Rio Hondo Channel Bridge
Repair Pressure-Relief Valve Station Project
 Slurry Seal CM/Inspection
 Youth Center Renovations, Project No 50100
 Golf Course Fire Damage Repairs, CIP No 21345
 Beverly Blvd and San Gabriel Parkway Median
 Regional Bikeway CIP No 21280 ATPL 5351(032)
 Citywide Major Streets 50047, 50048, 50066, 50067
 Senior Center Tenant Improvements - CIP No 50036
 Emergency Storm Drain
 Code Enforcement Services
 Mines Ave Pavement Coring & Testing
 Mines Ave Striping

Proposal for On-Call Engineering Services 3
Capability, Availability, Current Workload and Proven Record of Meeting Schedules on Similar Types of Projects
Within the last seven years, Willdan has completed projects and task orders for over 200 as-needed/on-call contracts at any given time and have ample capacity to provide civil engineering design services for the city including streets and highways, drainage, water/wastewater, signals, traffic programs, bridges and structures, rail facilities, mapping, landscaping, and parks. Our staff also bring significant and relevant qualifications that will result in successful performance. We offer 184 full- and part-time staff in the Southern California area who can be called upon to provide technical support or consulta�on to our project team. Our in-house capabilities and resource bench of over 1,600 staff members enable flexibility in staffing to rapidly reassign project workloads to an expanded team of subject matter experts from a variety of public works construction projects scheduled within the next several years, as well as private developments requiring public works inspection. We invite the City to contact our Reference clients to learn more about our proven record of meeting schedules on similar types of projects.

Similar Experience
Willdan's core competencies are in direct alignment with services identified in the City of Pico Rivera’s requested scope of services. The matrix below represents a small fraction of the local agencies Willdan serves – or has served – with services like the services requested. Detailed descriptions of our most relevant projects are included in the Reference section.

Client
Civil Engineering
Traffic Engineering
Landscape Architectural
Drainage Engineering
Survey/Right-of-Way
Grant Administration
Geotechnical Services
Construction Management/
Inspection
Labor Compliance
Grant Application
Preparation
NPDES/Watershed
Management
Staff Augmentation
Los Angeles County
City of Pico Rivera          
City of Agoura Hills         
City of Bell            

Proposal for On-Call Engineering Services 4
Client
Civil Engineering
Traffic Engineering
Landscape Architectural
Drainage Engineering
Survey/Right-of-Way
Grant Administration
Geotechnical Services
Construction Management/
Inspection
Labor Compliance
Grant Application
Preparation
NPDES/Watershed
Management
Staff Augmentation
City of Calabasas      
City of Cudahy        
City of El Monte        
City of Inglewood           
City of La Puente            
City of Lakewood            
City of Norwalk            
City of Paramount           
City of Pico Rivera            
City of Rancho Palos Verdes          
City of Rolling Hills      
City of Rolling Hills Estates           
City of Rosemead         
City of South Gate           
City of Westlake Village        
Orange County
City of Anaheim        
City of Brea          
City of Buena Park   
City of Laguna Niguel      
City of Los Alamitos            
City of Newport Beach         
City of Placentia        
City of Santa Ana    
City of Tustin     
City of Yorba Linda         
County of Orange     
Emerald Bay Service District       
Qualifications in the City’s Scope of Work
As-needed/on-call engineering services are Willdan's foundation. Our staff includes former public agency or contract agency staff. Therefore, we understand the importance and purpose of as-needed contracts and are very familiar with the processes and procedures for such services. Within the last seven years, Willdan has completed projects and task orders for more than 200 as-needed/ on-call contracts. This experience and the relevant experience of our dedicated and available key personnel are what best suits Willdan to provide the City with as-needed services. Our history of working with as-needed contracts has prepared our staff well to respond to all requests for services in a positive, efficient manner. Our firm's commitment to responsive Proposal for On-Call Engineering Services 5
service and successful project delivery has given us a reputation as a firm that can be trusted to listen, and to deliver a product our clients envision and embrace.

Civil Engineering
Willdan’s highly trained and experienced civil engineering staff is supported by technical experts in various disciplines throughout the company. As a result, Willdan offers a range of expertise that only a large firm can provide. Willdan’s civil design expertise includes transportation engineering; hydrology, drainage, flood control, and water/wastewater engineering. The firm’s team of engineering professionals combines practical knowledge and technical expertise to develop solutions that are unique and customized to each need. With an extensive staff that includes civil, structural, traffic, and bridge engineers, Willdan has designed numerous types of transportation facilities, has managed transportation projects from initial project analysis through final design and construction, and has prepared pavement investigation design reports, pavement failure investigation reports, and pavement management system reports.

Drainage Design/Studies
Willdan has expertise in all aspects of drainage and flood control – ranging from local and regional improvements to hydraulic and sediment transport analyses of major rivers. Quality engineering solutions in drainage and stormwater management have been one of the primary elements of Willdan’s municipal and public works experience. Willdan has prepared many watershed and floodway studies, completed flood control and drainage engineering projects, and performed design and construction inspection services. Our stormwater experts perform designs for major flood control improvements, large earthen dams for debris control, peak flow reduction facilities, and storm drain improvements. Our team assists federal, state, and local agencies and regional jurisdictions by providing ongoing flood control engineering services. Our facilities include an extensive library of computer applications for design, analysis, and modeling of drainage and flood control systems. The applications provide compatibility with the U.S. Army Corps of Engineers, along with state and local agencies.

Traffic Design/Studies
Willdan's traffic engineering experience and expertise covers all facets of traffic engineering and planning, including city traffic engineering, traffic analysis, design, and management. In addition to our proven expertise in traditional design services such as signing, striping, and traffic signal and street lighting design, our traffic engineers are skilled in sophisticated computer-based applications such as arterial corridor and network signal coordination studies.

They are proficient in traffic impact analysis and evaluation of transportation systems management, transportation demand management, and intelligent transportation systems strategies.

Willdan's traffic engineers are experts in conducting traffic surveys and data collection, investigating motorist and vehicle characteristics, identifying and recommending traffic safety and utilizing traffic laws and enforcement to determine traffic signal timing, and evaluating highway operations. Our traffic design team prepares traffic engineering designs to warn, regulate, and guide traffic and develop geometric design and channelization, traffic signal and street lighting plans and electrical design, parking lot designs, and traffic control/detour plans. They routinely lend their expertise for studies, reports, and designs for other improvements such as neighborhood traffic management/traffic calming, traffic impacts, school area and Proposal for On-Call Engineering Services 6
pedestrian safety, crosswalk visibility enhancements, traffic impact fees, local road safety plans and safe routes to school, signal timing, and traffic circulation for local and federally funded projects.

Traffic and Transportation Engineering
Willdan 's traffic engineering experience and expertise covers all facets of traffic engineering and planning, including city traffic engineering, traffic analysis, design, and management. In addition to our proven expertise in traditional design services such as signing, striping, and traffic signal and street lighting design, our traffic engineers are skilled in sophisticated computer-based applications such as arterial corridor and network signal coordination studies. They are proficient in traffic impact analysis and evaluation of transportation systems management, transportation demand management, and intelligent transportation systems strategies. Willdan's traffic engineers are experts in conducting traffic surveys and data collection, investigating motorist and vehicle characteristics, identifying, and making recommendations on traffic safety and utilizing traffic laws and enforcement to determine traffic signal timing, and evaluating highway operations. Willdan prepares traffic engineering designs to warn, regulate, and guide traffic. We develop geometric design and channelization, traffic signal and street lighting plans, parking lot designs, and traffic control plans.

Water Resources Design Services
Willdan incorporates hydrology and hydraulic services into our design services to mitigate hazards caused by flooding events and to assist our clients with Federal Emergency Management Agency criteria floodplain mapping certifications and re-certifications. Our hydrology analyses identify characteristics of watersheds and water sources such as precipitation, snowmelt, riverways, etc. and quantify the watershed flow rates. Hydraulic analysis, water flow force, velocity, and depth are calculated and determined. Through these two processes, Willdan's team utilizes geologic, geographic information system, and topographic mapping and data, hydraulic modeling software, and other technological resources to establish peak discharge, flood frequency, channel and flood control paths, sediment transport, bridge foundation stability, and retention and detention basin capacities. Willdan completed the City’s Sewer System Management Plan Update and prepared plans to upsize several of the Cities water mains.

Utility Coordination
Utility coordination – a critical path activity from design through construction – involves subsurface utility engineering, conflict analysis, communication, and cooperation with utility owners regarding project requirements, and construction observation or inspection of utility relocations. Successful coordination begins with early contact between individual utility owners and the project team. Willdan's utility coordination staff members routinely conduct discussions with agency staff and utility owners to ensure all stakeholders are aware of utility conflicts and assist with utility relocation. Our utility coordinators are knowledgeable in effectively identifying existing utilities, providing timely notification, and anticipating and resolving potential conflicts on plans and specifications. They are keenly aware that utility identification and location are crucial to project planning and development and are essential to saving time and money and keeping a project schedule on track. Our staff is adept at detailed identification and notification processes required for a myriad of project types.

Proposal for On-Call Engineering Services 7
Environmental Documentation Services
Willdan has a prolific history of providing environmental planning services to cities and counties throughout California. Willdan's planners prepare all necessary environmental documentation, as required by CEQA and/or NEPA, for public and private projects. Entitlements include, but are not limited to, general plan amendments, code amendment, rezones, tentative subdivision maps, conditional use permits, design reviews, and specific plans. We have the capability, experience, and expertise to prepare NEPA environmental documents for projects that are federally funded, implementing federal oversight NEPA guidelines, such as the Preliminary Environmental Studies form required by Caltrans Local Assistance, statutory worksheets, and environmental assessments/findings of no significant impacts for projects funded through Department of Housing and Urban Development, Community Development Block Grant, and HOME Investment Partnerships programs. Willdan can assist the county file notices with the County clerk and the State clearinghouse. Environmental documents prepared by Willdan's planners is broad and includes initial studies, negative/mitigated negative declarations, and NEPA/CEQA documents such as environmental impact reports, categorical exclusions, environmental assessments/findings of no significant impacts, and environmental impact statements.

Landscape Architecture
Willdan’s landscape architects offer an array of services and expertise that adds long-term value to communities. Our landscape architectural team possesses knowledge of applicable codes and construction experience to ensure code compliance with a focus on site analysis, user needs programming, site design, parks/sports field design, recreational trails design, landscape preservation, land management and reclamation, water conservation, and arboriculture.

Survey, Mapping and Right-of-Way Engineering
Willdan provides a wide range of surveying, mapping, and right-of-way engineering services for major transportation improvements, street widenings, sewer and water improvements, urban redevelopment, final and parcel maps, and easement descriptions. Field services provided by Willdan include boundary surveys and/or research, topographic base mapping, right-of-way easement stakeout, construction staking, site surveys, ALTA survey, control survey, easements and legal description, Geographic Information System (GIS), aerial mapping, design survey, title report review and GPS.

Willdan provides subdivision map and engineering plan review services. These services include preparing and/or reviewing annexation documents, easement documents, lot line adjustments, parcel and tract maps, dedications, and vacations, along with ensuring compliance with standards. Willdan’s survey and mapping services are provided to numerous cities and counties through teaming arrangements with local surveyors.

These services include design survey and construction staking, monument restoration, boundary survey, right-of-way engineering, and ensuring maps and documents are drawn to applicable standards.

Geotechnical Engineering
Willdan provides a full gamut of geotechnical studies, engineering geology, and materials testing and inspection, including subsurface exploration, geologic and seismic hazard assessment, soil testing, engineering and pavement analyses and designs, construction support (soils and materials testing and inspection), slope stability and settlement analysis, Proposal for On-Call Engineering Services 8
earthquake and seismic hazard analysis, and other special studies. Over the years, Willdan has successfully assisted our clients in completing projects in the areas of geotechnical engineering, engineering geology, and materials testing and inspection. Willdan maintains a full‐service soils and material testing laboratory.

Our laboratory is certified by the California Department of Transportation, Division of State Architect, the City of Los Angles and AASHTO Materials Reference Laboratory (AMRL). We also participate in the AASHTO Materials Reference Laboratory (AMRL), Cement and Concrete Reference Laboratory (CCRL), and Caltrans Proficiency Programs.

Utility Investigation and Locating
Utility coordination – a critical path activity from design through construction – involves subsurface utility engineering, conflict analysis, communication, and cooperation with utility owners regarding project requirements, and construction observation or inspection of utility relocations. Successful coordination begins with early contact between individual utility owners and the project team. Willdan's utility coordination staff members routinely conduct discussions with agency staff and utility owners to ensure all stakeholders are aware of utility conflicts and assist with utility relocation.

Our utility coordinators are knowledgeable in effectively identifying existing utilities, providing timely notification, and anticipating and resolving potential conflicts on plans and specifications. They are keenly aware that utility identification and location are crucial to project planning and development and are essential to saving time and money and keeping a project schedule on track. Our staff is adept at detailed identification and notification processes required for a myriad of project types.

Structural Engineering Services
Willdan provides complete structural engineering design, analysis, inspection, and evaluation of structural systems related to transportation-related infrastructure. Our experienced staff performs bridge advance planning studies and analyzes and designs bridges, sound walls, and retaining walls. They possess in-depth knowledge of all federal, state, and local criteria and methodologies for preparing project development documents, design, construction documents, and processing designs through Caltrans Local Assistance.

Electrical Engineering
Willdan completes engineering-intensive, detailed audits to develop to evaluate a facility’s existing electrical conditions and develop customized solutions that address our clients’ longterm needs. Willdan regularly completes ASHRAE Level II audits as part of our audits, providing the City with the conceptual scope details and cost estimates needed to make informed decisions to move into design phases. In the last five years, Willdan completed 500+ ASHRAE Level II audits in California alone.

Mechanical Engineering
Willdan’s extensive in-house capabilities cover the full spectrum of technical support services for energy related projects, from initial identification and analysis through the creation of conceptual layouts, technical specifications, and full 100% design documents. Willdan’s staff of energy engineers are extensively experienced with all the projects and service types and will work with the City staff to ensure that they receive the necessary mechanical, electrical, controls and civil engineering support. As necessary and as directed Proposal for On-Call Engineering Services 9
by the City, Willdan will leverage the design experience of our turnkey services division to develop the appropriate level of design documents, whether it is conceptual schematics, single-line diagrams, or 50%, 75% or stamped 100% designs.

Landscape Architecture
Willdan's landscape architecture services entail planning, design, management, and nurturing of built and natural
environments. Our landscape architects are well versed in planning, designing, and improving built and natural
environments that can be enjoyed by whole communities. Our designs incorporate art, environment, engineering, architecture, and sociology for improvements such as parks/playgrounds, school/college campuses, neighbor and commercial streets, major thoroughfares and arterial roads, trails and paths, civic buildings such as community centers and city halls, commercial centers, habitat and vegetation restoration, and other projects that strengthen the community and the surrounding environments.

With their combined experience in almost 70 major parks, mostly in California, our landscape architects offer an essential array of services and expertise that adds long-term value to projects and communities.

GIS Services
Willdan has been providing Geographic Information Systems (GIS) services to public agencies for over 30 years. We perform GIS analyses of civil infrastructure for use in planning and design.

We prepare base mapping for engineering design projects and convert them to CAD format for use in Autodesk Civil 3D and Microstation. We routinely convert CAD drawings to GIS format for analysis of sewers, storm drains, water distribution systems and other civil infrastructure. Willdan uses ArcGIS Desktop 10.8.2 Standard and Advanced licenses, ArcGIS Pro 2.9.3, the ArcGIS Spatial Analyst Extension, 3D Analyst Extension, and ArcGIS Online. We also use Autodesk Civil 3D 2021 and Bentley Microstation V8i.

Design Review Services
Willdan's proposed review team members provide plan, mapping, and study reviews for a full complement of development improvements for private development and public infrastructure.

Our team offers highly qualified discipline specialists capable of reviewing civil and traffic engineering, environmental, geotechnical, landscape, and structural designs and reports for residential, industrial, and commercial developments; public buildings; recreational facilities; site grading; landscaping; transportation improvements; and utility, storm drain, and flood control facilities.

Willdan's capabilities in improvement plan reviews encompass street, drainage, sewer, and water plans; hydrology/hydraulic and preliminary drainage studies; FEMA requirements; and design for landscape and irrigation, bridges and structures, and park facilities – to name a few. Willdan provides traffic design plans reviews for land development projects such as traffic signals, signing and striping, street lighting, temporary traffic control and construction de-tours, electric vehicle charging stations, pedestrian and bicycle facilities, and circulation plans. Hydrology and hydraulic calculations are checked for accuracy to verify drainage plans are adequate for design runoff. Structural calculations, when submitted, are checked by our in-house engineers specializing in bridges, retaining walls, and other structural improvements. Grading plans are checked against geotechnical recommendations. Utility offsite improvement plans prepared for other Proposal for On-Call Engineering Services 10
agencies are reviewed for conflict/consistency with established design guidelines. Street improvement plans are reviewed for ADA compliance. Willdan provides local area reviews for parcel and tract maps, lot line adjustments, certificates of compliance, vacations and dedications, and other survey documents. Our team routinely assists clients with parcel and tract maps; boundary, topographic, ALTA, and right-of-way surveys; boundary line adjustments; legal descriptions; and other survey services. Our team utilizes AutoCAD 3D, MicroStation, GIS, and other software to identify, analyze, and determine ownership line discrepancies, overlaps, or gaps. Willdan’s plan check team members possess improvement plan check capabilities in street, sewer, ADA requirements, traffic, street lighting, striping, and erosion control and drainage plans. Our staff regularly attend seminars, affiliated organization events, and workshops to remain current with updated standards and regulations including ADA, National Pollutant Discharge Elimination System (NPDES), and Low Impact Development (LID).

Staff Support and Augmentation
Willdan was founded on the principle of providing staff augmentation services to our municipal clients—a principle that benefited our clients and enabled our growth and success. Willdan personnel serve as land surveyors, city and traffic engineers, building officials, plans examiners, inspectors, planning directors, case planners, public works directors, or project managers. Their backgrounds and experience serving as public agency staff and as contract staff through Willdan's extension of staff services, provide a clear understanding of challenges facing public agencies.

Combining the strength of these personnel with experts nationwide, Willdan offers practical, timely, costeffective solutions that meet community needs.

Grant Administration
Willdan is thoroughly familiar with regulations pertaining to expenditures of federal, state, county, and local funds, including:
 Arterial Highway Rehabilitation Program (AHRP)
 Active Transportation Program (ATP)
 Highway Safety Improvement Program (HSIP)
 Surface Transportation Program Local (STPL)
 Safe, Accountable, Flexible, Efficient Transportation Equity Act (SAFETEA-LU)
 Community Development Block Grant (CDBG)
 Congestion Mitigation and Air Quality (CMQAQ)
 Highway Bridge Program (HBP)
 Transportation Development Act (TDA)
 Call for Projects
 Measure M, R and W
 Proposition A and C
 Proposition 42
 Proposition IB
 SBI
 State Gas Tax
 Urban Greening Grant
 Various other grant and funding
sources
This knowledge is critical in executing projects funded by federal or state programs that have special permitting and reporting requirements. We have worked extensively for and with the CPUC, all Caltrans Districts, Caltrans Division of Structures, Regional Water Quality Control Boards, and the U.S. Army Corps of Engineers. We have processed numerous permits and approvals through FHWA, CPUC, FRA, CTC, CCC, CDFW, RWQCB, etc. We are familiar with funding, permitting, and procedural requirements of these agencies and have an excellent working relationship with the essential staff involved in local agency programs.

Our contacts with personnel in these agencies enable us to facilitate permit processing and compliance when required.

Proposal for On-Call Engineering Services 11
Grant Writing - Local, State and Federal
Willdan offers expertise in
funding sources to assist our
clients with obtaining available
funding for current and future capital
improvement projects. Our team offers vast
knowledge of local/state/federal funding
availability, along with administration and
procurement requirements, for a wide variety
of funding sources. Willdan's staff members
have prepared numerous funding and competitive grant applications for various client cities. The applications generally require extensive research to investigate facilities and existing conditions, soliciting support from local civic groups, and completing a detailed cost estimate for project implementation. Willdan offers expertise in grant writing and selecting winning projects. Our submittals have a greater than 50 percent award rate on competitive state and federal grants. In addition, Willdan's team possesses vast experience preparing and processing required Caltrans forms for local agencies, including state and federal funding forms, checklists, invoices, and reports of expenditures. Willdan has assisted local agencies at various project stages with state and federal funding, from the initiating request to final invoicing. Willdan team members maintain quality relations with Caltrans’ District Local Assistance. Willdan offers expertise in grant writing and selecting winning projects. Willdan has an excellent track record in pursuing and securing state/federal funding.

In HSIP Cycle 11, we submitted 14 applications and 13 were awarded for over $6.5 million, a 93% success rate. To date, we have been awarded a total of $100M+ in funding and have obtained $.5B for our clients!
Construction Management and Inspection
Willdan provides expertise in all areas of project and construction management, construction administration, construction inspection and observation, grant funding administration and compliance, labor, and DBE compliance, claims review and investigation, materials testing, and community relations. We specialize in partnering with clients to maintain good community relations with residents and businesses affected by construction. Willdan's corporate philosophy emphasizes strong leadership, cost effectiveness, timely performance, and consistent reciprocal communication with clients and internal and external resources.

Our resident engineers, construction managers, and construction inspectors offer reliable service, quality workmanship, use of good judgment, fair and equitable treatment, and adherence to our corporate integrity.

These experienced team members identify and correct discrepancies, ambiguities, omissions, or conflicts in plans, specifications, and bid schedules that might generate misinterpretation and/or lead to agency and contractor disagreements. Our professionals are adept at anticipating issues before they arise through continual review of project plans, specifications, contractors’ schedules, and contract documents. Potential problems are brought to the attention of the project manager and/or the contractor, along with constructive recommendations for solutions, so that costly delays and negative impacts to the public are avoided.

Proposal for On-Call Engineering Services 12
Labor Compliance Management and Oversight
Willdan has been providing federal labor compliance services for over 25 years. This experience has enabled our staff to develop an extremely efficient compliance management system – perfected through continual review and updates – that maximizes efficiency, minimizes cost, and provides our clients with a high level of comfort about project progress.

Our staff members have extensive and varied experience with contract administration in general – where state law often has a bearing on contract compliance. In addition, our staff has undergone training to administer projects funded by a variety of state and federal sources, including California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), Federal Transit Administration (FTA), Department of Energy (DOE), Environmental Protection Agency (EPA), State Water Resources Control Board (SWRCB), and U.S. Department of Housing and Urban Development (HUD). Our staff members are cognizant of the reporting requirements for these agencies and have been thoroughly trained in fraud prevention and detection.

Materials Engineering Services
Willdan provides a full gamut of geotechnical studies, engineering geology, and materials testing and inspection, including subsurface exploration, geologic and seismic hazard assessment, soil testing, engineering and pavement analyses and designs, construction support (soils and materials testing and inspection), slope stability and settlement analysis, earthquake and seismic hazard analysis, and other special studies. Over the years, Willdan has successfully assisted our clients in completing projects in the areas of geotechnical engineering, engineering geology, and materials testing and inspection. Willdan maintains a full‐service soils and material testing laboratory. Our laboratory is certified by the California Department of Transportation, Division of State Architect, the City of Los Angles and AASHTO Materials Reference Laboratory (AMRL). We also participate in the AASHTO Materials Reference Laboratory (AMRL), Cement and Concrete Reference Laboratory (CCRL), and Caltrans Proficiency Programs.

C. Proposed Staffing
Willdan Engineering provides services to perform, facilitate and oversee project design, coordinate with public and private utilities, cities, and agencies, assist with bidding and submittal review, and complete asconstructed record drawings related to CIP projects. In line with these services, the firm performs necessary design, surveys, studies, investigations, and other relevant services to deliver a complete design package to our clients.

Organizational Chart
The project organization chart contained herein identifies the key personnel and further illustrates the communication and reporting relationships and project roles for Willdan's team. Willdan attests that key personnel will be available to the extent proposed for the duration of the Professional Services Agreement and that no person assigned to a project will be removed or replaced without the prior written concurrence of the City of Pico Rivera. It is important to note the personnel shown are all Willdan employees and the technical staff depicted represent the caliber of person who may be called upon to provide support to our key staff.

This is far from an exhaustive list of our staffing resources and is shown to assist the City in evaluating the caliber and depth of our staff.

Proposal for On-Call Engineering Services 13

Proposal for On-Call Engineering Services 14
Project Management Team
Tyrone Peter, PE will be the Project Manager and the City’s point of Contact. He possesses extensive expertise with municipal and public works capital improvement and maintenance projects. He is an experienced project manager – skilled at building strong relationships with clients, community members, fellow staff, and supervisors. Tyrone is familiar with approval and permitting procedures for federal, state, county, and local jurisdictions, and regulatory permits. He has experience with funding sources, including assessment districts; enterprise funds; and other federal state, and local programs. Tyrone’s broad experience in city engineering, project management, and supervision of design teams – along with his exceptional understanding of procedures and processes for public works and engineering operations in the municipal arena – provide a strong project manager capable of maintaining budgets and schedules for our client's capital improvement projects.

Key Staff Qualifications
As Willdan explored the contract scope and identified and investigated key City needs based upon the City's Request for Proposals and our knowledge of the City, we assembled our project team – matching expertise to on-call needs. The selected individuals will lend their expertise and knowledge to the City through innovative solutions and quality results. Willdan is committing high-performing key staff to the City's On-Call Civil Engineering Services contract. They will be supported by team members with expertise in maps, lot line adjustments, and quit claim processing; Low Impact Development (LID) review, erosion, grading drainage, and utility plan review; geotechnical engineering and reports; and land surveying. Our Design Engineering Group offers full-and part-time staff who can be called upon to assist or provide consultation to our project team. These resources possess relevant experience as project and task managers, design engineers, GIS and technical report analysts, and technical aids. In total, Willdan offers over 1,500 staff members that can provide consultation in other relevant disciplines such as construction management and inspection; geotechnical and right-of-way engineering; constructability review; safety lighting; environmental; and services related to energy and municipal financing.

Key Personnel Matrix/Resumes
We have highlighted our staff qualifications in the matrices on the following pages to show our key personnel’s role, qualifications, licenses, and experience. Full resumes for our key staff are included in the Appendix.

Tyrone Peter, PE
Project Manager
Education /
Credentials
 BS, Engineering and Civil Engineering, Tamil Nadu College of Engineering  Civil Engineering, Murugappa Polytechnic
 Civil Engineer, California, No. 81888
Experience  18 Years of Experience
 City of Pico Rivera, As-Needed Engineering Services
 City of Los Alamitos, As-Needed Engineering Services
 City of Paramount, On-Call City Engineering Services
 City of La Puente, On-Call City Engineering Services
 County of Orange, On-Call Plan Check Services
 City of Yorba Linda, As-Needed Engineering Services
 City of Cerritos, On-Call Plan Check Services
 City of Inglewood, On-Call Project/Program Management Services Project Manager
Contact Information
Tyrone Peter PE
(657) 223-8557
[email protected]
Scan to save contact information

Proposal for On-Call Engineering Services 15
Jeff Lau, PE, TE, ENV SP
Deputy Project Manager
Education /
Credentials
 BS, Civil Engineering, California State Polytechnic University, Pomona  Civil Engineer, California No. 83887
 Traffic Engineer, California No. 2335
 Envision Sustainability Professional, No. 45376
 Doppler Radar Operator
Experience  20 Years of Experience
 City of Pico Rivera, As-Needed Engineering Services
 County of Los Angeles, On-Call Traffic Engineering Services  City of La Puente, On-Call Traffic Engineering Services  City of Pico Rivera, On-Call Traffic Engineering Services  City of Lakewood, On-Call Traffic Engineering Services  City of Paramount, General Engineering Services
Vanessa Munoz, PE, TE
Principal-in-Charge | Quality Assurance Manager
Education /
Credentials
 BS, Civil Engineering, California State Polytechnic University, Pomona  Traffic Engineer, California No. 2341
 Civil Engineer, California No. 67583
 Doppler Traffic Operator
Experience  26 Years of Experience
 City of Pico Rivera, On-Call Traffic Engineering Services  City of La Puente, On-Call Traffic Engineering Services  City of Lakewood, On-Call Traffic Engineering Services  Traffic Signal Communication Plans for the LAWA ITS Improvement Project City of Paramount
 Garfield Avenue Regional Corridor Capacity Enhancement, City of Paramount  Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood Ron Stein, PE, ENV SP
Preliminary Engineering and Planning Studies | Design | Bid and Construction Support Service Education /
Credentials
 BS, Civil Engineering, Florida State University, Tallahassee  Civil Engineer, California No. 86877
 Envision Sustainability Professional, No. 56028
Experience  12 Years of Experience
 City of Pico Rivera, As-Needed Engineering Services
 City of Lo*s Alamitos, As-Needed Engineering Services  City of La Puente, On-Call City Engineering Services
 County of Orange, On-Call Plan Check Services
 City of Rialto, On-Call Plan Check Services
 City of Inglewood, On-Call Project/Program Management Services Our technical support leads and other staff available to the City are presented on the following pages.

Proposal for On-Call Engineering Services 16
Support Staff / Job
Classification
Education Background / Credentials Experience
Jocelyn Limas, PLS
 Surveys, Mapping and
Field Reviews
 Right of Way Phase &
Determination
 AS, Sociology,
 Continuing Education - Subdivision Map Act
Class
 Land Surveyor, California No. 9596
 Remote Pilot License, Federal Aviation
Administration No. 4080288
 20 Years of Experience
 Plan Checking and Development Services, City Surveyor for City of Elk Grove
 Staff Augmentation, City Surveyor for Rancho Cordova
 Staff augmentation, City Surveyor for City of Ione
 County of Sacramento Survey Services
Salvador Lopez Jr.
 Environmental Studies
and Documentation
 BS, Urban and Regional Planning, California
State Polytechnic University, Pomona
 24 Years of Experience
 Planning and Environmental Services, Cities of Artesia and Culver City
 On-Call Engineering Services, City of La Puente
 On-Call CEQA/NEPA Planning Services, City of
Claremont
Tamara Boeltl
 Utility Research and
Coordination
 General Education, Moorehead State
University, MN
 Blueprint Reading, Fullerton Community
College
 Building Construction, Pasadena Community
College,
 Business English, Rio Hondo College,
Whittier
 35 Years of Experience
 Street Rehab FY22, City of Pico Rivera
 Underpass Drainage, City of Pico Rivera
 Bowman Channel, City of Ridgecrest
 Alondra Boulevard, City of Paramount
 Paramount Bike Trail, City of Paramount
Lani Alfonso, PE
 Construction Phase
Authorization
 Grant Administration
 BS, Civil Engineering
 Civil Engineer, California, No. 5639
 32 Years of Experience
 City of Inglewood Intermodal Transit Facility
 Miscellaneous Engineering Services, City of Pico Rivera  City Engineering Services, City of Westlake Villag
David Knell, PE
 Prior Rights Expertise
 Survey Lead
 BS, Cartography, Boston University, Boston
 Civil Engineering and Land Surveying
Classes, California State University, Long
Beach
 Land Surveyor, California No. 5301
 44 Years of Experience
 Lakewood Blvd Regional Corridor Capacity Enhancement, City of Lakewood
 Firestone Blvd Capacity Enhancement, City of South Gate  On-Call Map Review, City of Hawaiian Gardens
Rafael Casillas, PE
 Civil Design Lead
 BS, Public Administration, University of La
Verne
 Civil Engineering (196 units), California State
University, Los Angeles | Architecture
Studies, Phoenix Institute of Technology
 Civil Engineer, California No. 68234
 34 Years of Experience
 Walker Avenue at Florence Avenue Intersection
Improvements and Widening, City of Bell
 Arterial Street Resurfacing and Garfield Avenue
Regional Corridor Capacity Enhancement, City of
Paramount
George Saba, PE
 Civil Design
 BS, Civil Engineering
 Civil Engineer, California No. C-54563
 30 Years of Experience
 City of Norwalk, Norwalk-Local Street Rehabilitation
 City of Paramount, West Santa Ana Bicycle & Pedestrian Trail
 City of Rolling Hills Estates, Rolling Hills Road Bicycle Lane Improvements
Matthew Crim, PE, ENV SP
 Civil Design
 Envision/Agency
Coordination
 BS, Civil Engineering, Cal Poly Pomona
 Civil Engineer, California No. 94393
 Envision Sustainability Professional, Institute
for Sustainable Infrastructure (ENV SP) No.
45380
 14 Years of Experience
 Guard Rail Project Tioga Drive, City of Modesto
 Marks/Nees/Chestnut Avenues Overlay, City of Fresno
 ADA Design, City of Fresno
 West Ward Avenue Street Rehabilitation, Ridgecrest
Bernardo A. Reyes
 Civil Design
 Experienced Civil Designer  10 Years of Experience
 West Santa Ana Bicycle and Pedestrian Trail, Phase IV, City of Paramount
 HSIP Cycle 8 Design, City of La Puente
 Garfield Avenue Improvements, City of Paramount
Chris Stone
 Civil Design
 Graduate Courses, Mathematics, Oregon
State University; Engineering Mechanics,
Montana State University
 BS, Civil Engineering, Montana State
University
 25 Years of Experience
 On-Call Plan Checking Services, City of La Quinta
 Plan Checking Services, Cities of Paramount, El Monte  Mall Plan Check Services, City of Manhattan Beach
 Improvement Plan Check Services, City of San Bernardino

Proposal for On-Call Engineering Services 17
Support Staff / Job
Classification
Education Background / Credentials Experience
 Civil Engineer, Nevada No. 12379; Arizona,
No. 55200
Yocelin Cruz, ENV SP
 Civil Design
 BS, Civil Engineering, California State
Polytechnic University, Pomona
 Envision Sustainability Professional, Institute
for Sustainable Infrastructure (ENV SP)
 4 Years of Experience
 Traffic Signal Communication Plans for the LAWA ITS
 Grant Funding Support Services, City of Paramount
 HSIP Cycle 10 Grant Application, City of Modesto
Sheila McCracken
 Utility Design Lead
 Highly experienced with utility companies  35 Years of Experience  Sanitary Sewer Master Plan (SSMP) Upgrade, City of
Covina
 Compton Creek Alternatives Study, County of Los Angeles  Roadside Bridge Widening Phase I – City of Agoura Hills  General Engineering Services, City of South Gate
Susy Barrientos
 Survey
 BS, Civil Engineering, California State
 Polytechnic University, Pomona
 24 Years of Experience
 Base Line Street Widening, City of Highland
 On-Call Professional Services, Cities of El Monte, South Gate
 South Highland Ave Widening, City of Fontana
Michael Bustos, PE, ENV
SP
 Storm Drain/Water/Sewer
Lead
 BS, Civil Engineering (Magna Cum Laude),
California Polytechnic State University, San
Luis Obispo
 Caltrans Resident Engineer Academy
 Civil Engineer, California No. 73173
 Envision Sustainability Professional, Institute
for Sustainable Infrastructure No. 2696
 21 Years of Experience
 Annual Street Resurfacing, City of Westlake Village
 Imperial Highway Improvements, City of Inglewood
 Palos Verdes Drive North/Rolling Hills Road Traffic Signal Modifications, City of Rolling Hills Estates, California Christopher Kelley, PE,
QSD/P
 Storm Drain/Water/Sewer
 BS, Civil Engineering, California Polytechnic
State University, Pomona
 Civil Engineer, California No. 83179
 Qualified SWPPP Developer, No. 25874
 18 Years of Experience
 On-Call Engineering Services, City of Los Alamitos
 On-Call Engineering Services, City of Rolling Hills Estates  Manhattan Beach Mall Rehabilitation, City of Manhattan Beach
Ana Ananda, PE
 Storm Drain/Water/Sewer
 MS, Sanitary/Environmental Engineering
 BS, Civil Engineering
 Professional Engineer, California No. 44287
 California WTPO Grade 4; WDSO”Grade 5;
Sewer Collection System Operator Grade 4
 35 Years of Experience
 Various Projects, City of Pico Rivera, California.
 Glenoaks Boulevard HSIP Cycle 7 and Resurfacing
Improvements HSIP-5202(018), City of San Fernando
Kenneth Krieger
 Hydrology/Hydraulics
Lead
 Storm Drain/Water/Sewer
 Experienced Civil Designer  29 Years of Experience
 On Call Services, City of South Gate
 ADA Ramps and Sidewalks, City of Los Alamitos
 Garfield Avenue Improvements, City of Paramount
 Sewer Line Repair Project, City of Ridgecrest
Jennifer Chin
 Storm Drain/Water/Sewer
 BS, Civil Engineering, University of Nevada
Las Vegas
 Civil Engineering, Nevada No. 25725
 Certified PACP/LACP/MACP Professional, U
0817-07009026
 17 Years of Experience
 City of Pico Rivera FY22-Citywide Street Rehabilitation  City of Napa On-Call Engineering Services
 City of Lynwood Lyn-Wright Road Rehabilitation
 Atherton On-Call Engineering Services
Joseph Bellomo, PE,
QSD/P
 SWPPP/WQMD Lead
 BS, Civil Engineering, California State
University, Los Angeles
 Civil Engineer, California No. 75564, Exp.
6/30/24
 Qualified SWPPP Developer (QSD) and
Qualified SWPPP Practitioner (QSP) (exp.
8/29/19) No. 20016
 25 Years of Experience
 NPDES/EWMP Consulting Services, City of San Fernando
 NPDES Consulting Services, City of La Cañada Flintridge  NPDES/Water Quality Consultant Services, City of Hidden Hills
 NPDES Services, City of Bell
Tejal Gandhi, PE, QSD/P
 SWPPP/WQMD
 BS, Civil Engineering, California State
Polytechnic University, Pomona
 Civil Engineer, California No. 79637
 Qualified Stormwater Developer/Practitioner,
California Stormwater
 Quality Association No. 25524
 15 Years of Experience
 Sanitary Sewer Feasibility Study, City of Rolling Hills  Preliminary City Bridle Trail Drainage Analysis, City of Rolling Hills Estates
 Planning & Engineering Services FY 2019, County of
Orange

Proposal for On-Call Engineering Services 18
Support Staff / Job
Classification
Education Background / Credentials Experience
Kelsey Reed, CESSWI,
QSP
 SWPPP/WQMD
 Qualified Stormwater Practitioner (QSP), No.
25680
 Certified Erosion, Sediment and Storm Water
Inspector, No. 4574
 Rainwater/Stormwater Post-Construction
BMP Inspect. & Mtc Cert.
 Certified Hazardous Waste Operations and
Emergency Response (HAZWOPER)
 9 Years of Experience
 NPDES FY 22/23, City of Westlake Village
 Municipal NPDES Services, City of Agoura Hills
 NPDES FY 22/23, City of Hidden Hills
 NPDES FY 22/23, City of La Cañada Flintridge
Mayra Martinez
 NPDES Lead
 BS, Environmental Science and Resource
 Management, California State University,
Channel Islands
 American Red Cross First Aid/CPR/AED
 9 Years of Experience
 On-call City Engineering Services, City of La Puente
 NPDES Consulting Services, cities of San Fernando. La Cañada Flintridge, Hidden Hill, Westlake Village
Kayla Urbina, EIT
 NPDES
 BS, Environmental Engineering, University of
Southern California
 Engineer-in-Training
 2 Years of Experience
 NPDES Consulting Services, Cities of San Fernando, La Cañada
 Flintridge, Hidden Hills, and Canyon Lake
Farhad Iranitalab, PE, TE
 Traffic Studies Lead
 BS, Civil Engineering, Oregon State
University
 MS, Transportation Engineering, Oregon
State
 Civil Engineer, California No. 33142
 Traffic Engineer, California No. 1695
 37 Years of Experience
 On-Call Engineering Services, City of Paramount
 As-Needed Engineering Services, City of Inglewood
 City Traffic Engineering Services, City of La Canada
Flintridge
Nicolle Spann, PE, TE
 Traffic Studies
 BS, Civil Engineering, California State
Polytechnic University, Pomona
 Traffic Engineer, California No. 2933
 Civil Engineer, California No. 91787
 Civil Engineer, New Mexico No.26862
 8 Years of Experience
 West Santa Ana Branch Bicycle Trail, City of Paramount  Garfield Ave Class II Bicycle Lanes, City of South Gate  Lakewood Blvd Regional Corridor Capacity Enhancement, City of Lakewood
Joanne Itagaki
 Traffic Studies
 BS, Civil Engineering, California Polytechnic
State University, Pomona
 Fundamentals of Traffic Engineering,
Fundamentals of Traffic Signal Design, Safety
through Construction and Maintenance
Zones, Institute of Transportation Studies
 Doppler Traffic Radar Operator
 37 Years of Experience
 Parking Intrusion Study, City of Lakewood
 Traffic Calming Program, City of Bellflower
 Plan Checking Services, City of Paramount
 Transportation Engineering Services, Cities of Downey, Bell Gardens, Paramount, Rosemead, Pico Rivera
Emilio J. Murga, EIT
 Traffic Studies
 BS, Civil Engineering
 Engineering-in-Training, California No.
162881
 5 Years of Experience
 6 Years of Experience
 City Traffic Engineer/On-Call Traffic Engineering, City of Paramount
 City Traffic Engineer/On-Call Traffic Engineering, City of Inglewood
 On-Call Traffic Engineering, City of Temecula
Minh Phan, TE
 Traffic Design Lead
 BS, Civil Engineering, California State
Polytechnic University, Pomona
 Registered Traffic Engineer, CA, No. 2219
 24 Years of Experience
 City of Ridgecrest, Upgrade of Traffic Signal Hardware At 7 Intersections; and Installation of Signage and Pavement Markings for 12 Intersections
 Alameda Corridor East Project, Los Angeles County
 HSIP – Avenue R and 55th Street East, City of Palmdale, CA
Kevin Custado, ENV SP
 Traffic Design
 BS, Civil Engineering, California Polytechnic
State University, Pomona
 Engineer-in-Training, California No. 153964
 8 Years of Experience
 RRFB For Various Schools City of Modesto
 Northeast Quadrant Road Rehabilitation, City of Turlock  City Yard Transit Electrification, Fairfield
 Copper Avenue and Auberry Road Traffic Signal, County of Fresno
Robert Burch
 Traffic Design
 AA, Liberal Arts, Mount San Antonio College,
Walnut
 Post Certified Radar Operator, California
State University, Fullerton
 31 Years of Experience
 Traffic Signal Installation at Golden State Blvd and
American Ave, County of Fresno

Proposal for On-Call Engineering Services 19
Support Staff / Job
Classification
Education Background / Credentials Experience
 Extension Courses, Traffic Signal Equipment
and Operations and Construction Inspection
for Traffic Signals and Highway Lighting
Systems, University of California, Berkeley
 Traffic Signal Installation at Copper Ave and Auberry Rd, County of Fresno
 Traffic Signal Installation at Grantland Ave and Shaw Ave, County of Fresno
Maryanne Truong, ENV SP
 Traffic Design
 BS, Civil Engineering
 Engineer-in-Training, California No. 178108
 Envision Sustainability Professional (ENV SP)
#45543
 5 Years of Experience
 On-Call Traffic Engineering, City of Paramount
 On-Call Traffic Engineering, City of Inglewood
 On-Call Traffic Engineering, City of Temecula
Miguel Obregon, ENV SP
 Traffic Design
 BS, Civil Engineering
 Engineer-in-Training, California No. 175555
 Envision Sustainability Professional (ENV SP)
#45742
 4 Years of Experience
 On-Call Traffic Engineering, City of Paramount
 On-Call Traffic Engineering, City of Inglewood
Bryan Cruz, ENV SP
 Traffic Design
 BS, Civil Engineering
 Envision Sustainability Professional (ENV SP)
#45531
 3 Years of Experience
 On-Call Traffic Engineering, City of Paramount
 On-Call Traffic Engineering, City of Inglewood
Reggie Greene
 Traffic Design
 BS, Civil Engineering, California Polytechnic
State University, Pomona
 Doppler Traffic Radar Operator
 24 Years of Experience
 Lakewood Blvd/Hardwick St Traffic Signal, City of
Lakewood
 Garfield Ave/70th St Traffic Signal Installation, City of Paramount
 Bicycle Safety Improvements, City of El Monte
Joseph Ritchey
 Geotechnical Reports
and Testing Lead
 Coursework in inspection of structural
masonry, reinforced concrete, post tension
concrete, and prestressed concrete, Robert
Schiltz School of Inspection
 Epoxy injection inspection: In depth hands-on
training, Sika Seminar, Glendale School
District
 ICC – Certified Special Instructor, Structural
Masonry; Certified Special Instructor, Soil
 DSA – Structural Masonry; Assistant
Inspector-of-Record
 43 Years of Experience
 Geotechnical and Material Special Inspection and Testing Services, City of Pomona
 Geotechnical and Material Special Inspection and Testing Services, City of Covina
 Geotechnical and Material Special Inspection and Testing Services, City of Diamond Bar
Ramon Calbay
 Geotechnical Reports &
Testing
 BS, Civil Engineering, Mapua Institute of
Technology, Manila, Philippines
 Certified in Soils Laboratory Testing, Caltrans
 Nuclear Gauge Operator CPN International,
Inc.
 43 Years of Experience
 El Sobrante Landfill, Riverside County
 Irvine Spectrum Center, Irvine
 University of California; Parking Structure, Long Beach  McArthur Widening/Overcrossing 405 Freeway, Irvine
Christine Kudija, J.D., AICP
 Environmental
Compliance & Permitting
Lead
 Juris Doctor, Northwestern School of Law,
Lewis and Clark College, Portland, OR
 MLA, Landscape Architecture, California
Polytechnic University, Pomona
 BA, Botany, University of California, Santa
Barbara
 Certified Planner, American Institute of
Certified Planners No. 085436
 Attorney, California State Bar No. 22233
 35 Years of Experience
 Planning and Environmental Services, City Cudahy
 Planning and Environmental Services, City Artesia
 Planning and Environmental Services, County of San
Joaquin
 Planning Services, County of Sacramento. Project
Manager
 On-Call Planning and Environmental Services, City of
Willows
Todd Gish, AIA, Ph.D.,

LEED AP
 Environmental
Compliance & Permitting
 PhD, Urban Planning, University of Southern
California
 M Arch, Urban Design, University of
California, Los Angeles
 BS, Architecture, University of Southern
California
 31 Years of Experience
 City of West Hollywood, Department of Planning &
Development Services, West Hollywood
 USC Price School of Public Policy, Los Angeles – Adjunct Associate Professor
Christopher Minniti, AICP,
LEED
 Environmental
Compliance & Permitting
 Masters, Urban Planning, New York
University
 BA, New York University
 American Institute of Certified Planners
 LEED Green Associate
 14 Years of Experience
 Planning Services, cities of Long Beach, Whittier, Downey  Community Development Department, Planning Division,
City of Culver City

Proposal for On-Call Engineering Services 20
Support Staff / Job
Classification
Education Background / Credentials Experience
Kevin Custado, EIT, ENV
SP
 Envision/Agency
Coordination Lead
 BS, Civil Engineering
 Engineer-in-Training, California No. 153964
 Envision Sustainability Professional No. 4540
 9 Years of Experience
 On-Call Traffic Engineering Services, City of La Puente  Firestone Boulevard Traffic Signals (HSIP), City of South Gate
 Street Lighting Design Services Project, City of Santa Monica
John Hidalgo, RLA
 Landscape Design Lead
 BS, Landscape Architecture, California State
Polytechnic University, Pomona
 Landscape Architect, California, No. 3551,
1991
 Landscape Architect, Nevada, No. 788, 2008
 1995, Licensed Contractor, California C-27,
No. 713613
 32 Years of Experience
 Kanan Road at US 101 Freeway Landscape
Modifications, City of Agoura Hills
 Riverfront Park, City of Maywood
 Summerland Parking Design & Circulation Design, County of Santa Barbara
Bryan Nguyen, RLA
 Landscape Design
 BS, Landscape Architecture, California
Polytechnic State University, Pomona*
 Street Tree Seminars
 Landscape Architect, California No. 4967
 25 Years of Experience
 Fountain Valley Recreation Center Expansion, City of
Fountain Valley
 As Needed Landscape Architect & Engineering Design
Services, County of Los Angeles
Carlos Espinoza, RLA
 Landscape Design
 Landscape Architecture Study Abroad,
Castiglione Fiorentino, Italy, ITALART
Associazione Culturale Centro Studi, S.

Chiara. Cal Poly Pomona Tuscany
 AA, General Education
 Landscape Architect, California No. 6534
 22 Years of Experience
 As Needed Landscape Architecture & Engineering Design Services, County of Los Angeles
 Clarksdale Skate Park Renovations, City of Hawaiian
Gardens
 Quality Control Inspection/Customer Services, City of Yorba Linda
Juan Vergara
 Landscape Design
 BS, Landscape Architecture; AS, Arts
 Contractors State License Board No. 1083637
 Landscaping Contractor/Tree Service
Contractor C-27 / C-61 / D-49
 10 Years of Experience
 On-Call Engineering Services, City of Paramount
 As-Needed Engineering Services, City of Los Alamitos
Camryn Lopez, EIT
 GIS Lead
 MS, Water Resources and Environmental
Engineering
 BS, Civil and Environmental Engineering
 Engineer-in-Training, California No. 171555
 4 Years of Experience
 CDBG Overlay, City of Highland
 Sidewalk and Parkway Improvement, City of Westlake
Village
 Street Improvements, City of El Monte
Rex Miller
 GIS
 GIS Specialist  29 Years of Experience
 Traffic Sign Inventory and Condition Assessment, Safety Network Traffic Signs, City of Ridgecrest, CA
 On-Call GIS Services, County of San Bernardino, CA
 On-site Wastewater Treatment System Inventory, Sewer
Connection Reporting and
 Flow Monitoring, City of La Canada Flintridge, CA
Jeffrey Jensen
 GIS
 MS, Civil Engineering, University of Nevada
 BS, Civil Engineering, University of Nevada
 Civil Engineer, Nevada No. 15737
 Certified PACP/LACP/MACP Professional, #U
0817-07009026
 Civil Engineer, Idaho No. P-18791
 22 Years of Experience
 Improvement Plan Review, County of Sutter, CA
 Technical Drainage Study and Improvement Plan Review, Clark County Department of Public Works, NV.
 Technical Drainage Study and Improvement Plan Review, Clark County Department of Public Works, NV.

Aaron Cohen, PE
 Structural Lead
 BS, Civil Engineering, California State
University-Long Beach | Master of Science,
Structural Engineering, Irvine Institute of
Technology
 California Professional Engineer, CE#58878
 ICC Plan Examiner
 29 Years of Experience
 City of Irvine East Campus Housing Structure project
 Structural Plan Check of university buildings, single and multi-family homes, industrial buildings, commercial
warehouses, restaurants, solar plans, tenant
improvements; Loma Linda, Riverside, Moreno Valley,
Orange County, Los Angeles County
Richard Uhlmann
 Structural
 Expert in Microstation CAD Software and
InRoads Civil Design Software
 AS, Civil Engineering Technology, Morrison
Institute of Technology, Morrison, IL
 41 Years Experience
 Walker Creek Bridge Phase II, County of Glenn, California  County Road 67 over Howard Slough Four Bridge
Replacement Projects

Proposal for On-Call Engineering Services 21
Support Staff / Job
Classification
Education Background / Credentials Experience
Jane Freij
 Grant
Funding/Administration
 BA, Linguistics, University of Kansas
 Attorney Assistant Training Program,
Litigation/ Corporations, University of
California, Los Angeles
 22 Years of Experience
 On Call Labor Compliance Services, cities of Long Beach and Brea
 Gridley and Reservoir Hill Parks and Playground CDBG
Improvements (Non-Entitlement)
Amanda Perez
 Grant
Funding/Administration
 AS, Human Resources Management, Mount
San Antonio College
 AS, Business Administration, Mount San
Antonio College
 12 Years of Experience
 Street Resurfacing Project, City of Rolling Hills Estates  Dolphin Ave Improvements, City of Ridgecrest
 Pavement Rehabilitation, City of Bell
Brian Moss, REHS
Grant
Funding/Administration
 BA, Environmental Studies, (Biological
Sciences minor)
 Registered Environmental Health Specialist
 32 Years of Experience
 General Land Development Engineering Services, cities of Los Alamitos, Paramount and Rolling Hills Estates
Casey Smith, PE
 Electrical
 Electrical Engineer, California No. 22029  5 Years of Experience  Eureka City Schools Vehicle-To-Grid Microgrid
Incorporating 140 KW
 City of Dublin $7M of DER Turnkey Projects (Solar PV, BES, EV Charging, Diesel Generators)
Taylor Briglio
 Electrical (Electric
Vehicle Charging)
 Master of Environmental Science and
Management, Bren School of Environmental
Science & Management - UC Santa Barbara,
Santa Barbara, CA
 BS, Environmental Science, UCLA, Los
Angeles, CA
 LEED Green Associate
 6 Years of Experience
 Southern California Association of Governments EV
Infrastructure Plans for 18 cities
 City of Fairfield Transportation Electrification Master Plan  Tulare County Association of Governments EV
Implementation Study
 City of Ridgecrest solar PV system, Level 2 EV chargers, and DC Fast Chargers
Benjamin Laboy, PE
 Mechanical
 MS, Earth Systems, Concentration in Energy
Efficiency, Stanford University, CA
 BS Science, Technology and Society,
Stanford University, CA
 Registered Professional Engineer
(Mechanical), California
 8 Years of Experience
 City of Dublin $7M of DER Turnkey Project Scope at 8
Different Facilities, Escondido Union School District Solar PV
 City of Elk Grove Solar PV System
 Eureka City Schools Vehicle-To-Grid Microgrid
 Golden Empire Transit (GETBus) 438kW PV System and
Associated 50kW Battery Energy Storage (BES) System
D. Consultants and/or Sub-consultants
As a full-service engineering firm, Willdan possesses the professional expertise and staff capabilities and availability required to complete the City’s Scope of Work. However, we bring extensive and long-term relationships with reputable professional DBE firms in Southern California to enable our clients to meet federal goals for their funded projects.

E. Work Approach
Management Approach
Multiple Task Order Project Management Approach Overview Our approach to serving the City on this contract is based upon our 60-year history of serving public agencies.

Willdan utilizes a management approach, whereby each assignment is undertaken by a project team. Each project is assigned to a senior member of our staff with the background, experience, and availability best suited for the assignment. Willdan has designated a team to provide on-call support services to the City for specific projects/task orders. The fundamental goal of Willdan's team is to provide the City with the highest level of support in completing the as-needed special tasks. This will require close personal coordination between Willdan and the City. To accomplish this, we will conduct interactive meetings with City staff Proposal for On-Call Engineering Services 22
throughout the course of each assignment to ensure all issues are addressed. Our team has a broad variety of talent and experience in city engineering; development review; public works permitting and inspection; capital improvement project design, inspection, and contract administration; facility and infrastructure maintenance and repair; surveying; and soils investigation. Combined with our understanding of the desired services, Willdan can assist the City with successful completion of all engineering matters.

Willdan will commit the appropriate staff to ensure specific projects, as well as the overall contract, are successful. Our intended approach is to:
 Fully understand each project
 Review each project scope of work in detail with City staff  Agree on course or extent of best-suited action
 Proceed with project accordingly
Having successfully completed many other assignments of this type for other agencies within the Los Angeles and Southern California regions, Willdan's proposed team understands City processes and possesses the technical and communication skills that are vital to ensuring each task receives the necessary attention, objectives are met, schedules are adhered to, and project tasks are within budget.

Keys to Success – Task Order Project Management
 Be proactive in informing City staff of project issues along with proposed resolutions  Commit to project schedules
 Develop and maintain collaborative, trusting working relationships with City staff  Be flexible on staffing and types of services provided to meet City's needs  Be cost-effective
 Have continuous-improvement mentality
 Be responsive to needs of City and involved communities Communication Approach
Willdan recognizes that effective, ongoing cooperative communication between all parties over the course of any assignment is essential to successful project completion. This communication starts with a project kickoff meeting where the objectives and expectations of the City for each task order/assignment are clearly articulated and understood by Willdan. In addition, agreed-upon methods and scheduling of formal reporting are established with identification of individuals to be involved in the project's decision-making process. This sets forth accountability and responsibility for informing and facilitating the project. As the project progresses, communication continues through regular correspondence, teleconference discussions, and meetings with City staff seeking direction on issues that may arise and keeping City staff apprised of the project. Clear and concise progress updates are provided. Emails and teleconferences are utilized whenever possible and appropriate to minimize City staff time spent in meetings.

Methodology
Willdan's methodology focuses heavily on client service and communications. As a firm with a strong public agency orientation, many of our client relationships are long-term and ones in which our staff develops intimate familiarity with the client's staff since we very often serve as an extension of public agency staff. As such, it is extremely important that our presence on each assignment is seamless. Willdan's staff assigned Proposal for On-Call Engineering Services 23
as Project Manager, City Engineer, Land Surveyor, Traffic Engineer, Building Official, and other higher-level positions most often work independently of the other project team members, since they are generally working directly for and with public agency staff as a part of the agency's staff. In this instance, the project team’s role is subservient to the primary assignment and only comes into play on a support basis or on a project-specific basis, such as for additional services for capital improvement project design, reviewing tract and parcel maps, and structural assessments.

Technical Approach
As previously stated, upon receipt of a project assignment or award, Tyrone will analyze the project and assign a Discipline Manager with the appropriate qualifications and experience to ensure tasks are completed in accordance with the City's goals and visions. Together, they will select qualified team members to provide technical support for the project. Tyrone will convey all-important matters to the assigned Discipline Manager and the selected project team as appropriate. The Discipline Manager will, then, take full responsibility for understanding the project requirements, detailing the project scope requirements, and estimating the fee to complete the project effectively and efficiently. The assigned Discipline Manager will maintain the team members assigned to the project from beginning to end. This means the same individuals responsible for design elements are the same individuals reviewing shop drawings, preparing as-built plans, or responding to questions during the bidding or construction process. This management approach has been proven on past projects to be effective in delivering projects on time, within budget and to the client’s satisfaction.

The Six Key Components Approach
Project Reporting
and Meeting
Tyrone will develop reports to be delivered electronically to key City of Pico Rivera staff as requested using a standard memorandum format developed by our team and as approved by the City. Regular progress meetings will be conducted by Tyrone to acquire information, keep staff informed of key design decisions, and obtain staff concurrence on project issues as the City requests.

Staffing and
Resource
Management Plan
Willdan is completely committed to providing the staffing and resources required to complete projects under this contract on schedule and with high quality. To ensure we meet this commitment, we prepare labor projections for all projects. Projections are made for each individual project and then aggregated by the technical director to produce division/office-wide labor needs and identify shortages or surpluses.

Labor planning for this contract will be conducted on an individualized basis. Tyrone, together with each assigned Discipline Manager, will identify the staff required to complete each awarded project and calculate the hours. This data will be input into our project staffing needs plan on a weekly basis. If the City awards Willdan a significant amount of work, Willdan will hire additional personnel, if needed, to provide additional support, as necessary.

For activities that do not require a specific person (i.e., draftsperson, technical aide, word processing, etc.), this estimate will be done on a position basis. Project staffing assignments will match the experience of personnel with the degree of project complexity. Because resources are often shared for any given project, our project managers are very involved in our staff workload projections.

Proposal for On-Call Engineering Services 24
Project Initiation
Our project approach includes our dedication to meet early with City of Pico Rivera staff to finalize the scope, schedule, and process, as discussed above. The assigned Discipline Manager – together with Tyrone – will hold a kick-off meeting with key City staff outlining the project schedule, specific needs, and project information as appropriate. The Discipline Manager will prepare the meeting agenda and notes and provide them to City staff in a timely manner. Once approved by the City, Willdan will await a notice to proceed from the City of Pico Rivera At this point, we will begin preliminary engineering and the project officially begins.

Project Objectives
The objectives of any project are essentially the objectives of the City of Pico Rivera. Prior to initiating Willdan’s efforts, a thorough understanding of City concerns and objectives is essential to ensure project success. Willdan will work closely with City staff and other involved agencies to identify specific goals, objectives, and challenges. The initial project scope and needs assessment are vital since the City of Pico Rivera’ and other involved agencies' goals could impact the schedule and overall cost.

Project Scoping
Once the Discipline Manager has identified the City of Pico Rivera’s goals for a project, the Discipline Manager will work with Tyrone to develop a comprehensive scope that clearly identifies the various tasks and associated deliverables – a critical component to ensure an effective and attainable project schedule. Willdan will develop a detailed scope of work that adheres to the sequence of tasks necessary to provide for project planning and design.

Development of a comprehensive scope of work will aid Tyrone in minimizing miscommunication among all project team members, including City of Pico Rivera staff and respective stakeholders.

Scheduling
Scheduling is a key component in any design process or project assignment. It enables the team to effectively deliver an on-time, within-budget project. It provides City staff and other reviewing agencies with the information they need to mobilize resources for timely reviews of project deliverables. The schedule allows the project team to mobilize appropriate staff in a timely manner to perform the tasks necessary for each deliverable.

After task requirements are identified, the Discipline Manager will work closely with Tyrone to determine staff availability. Tasks will, then, be allocated to project team members, depending upon the workload and skill sets relative to the scope.

Critical path methodology is used, and resource and cost loading are included when appropriate. Specific critical path items and key critical decisions that affect project progression are identified on a continuous basis.

Quality Assurance and Control
Quality assurance and control are critical to ensuring sound practices are applied and quality deliverables are produced. Vanessa Muñoz, PE, TE, will serve as the Quality Assurance Manager overseeing the quality assurance activities for services provided to the City. Vanessa is an accomplished manager who assists public agencies in serving their constituents with temporary as-needed staffing assistance or long-term assignments. He accomplishes this through his skilled insights into hiring and selecting staff with the right qualifications to create a seamless transition between Willdan and agency staff. Vanessa provides innovative solutions in engineering and construction management services for large-scale multi-discipline public works projects – working diligently to meet public agency budgets and schedules. His areas of expertise encompass capital improvement program (CIP) implementation, annual budget preparation, funding and grant Proposal for On-Call Engineering Services 25
administration, stormwater/National Pollutant Discharge Elimination System (NPDES) guidelines, and Americans with Disabilities Act (ADA) compliance. Vanessa is also a proficient negotiator and collaborator with well-developed decision-making and organizational skills. Typical quality assurance activities entail ensuring the appropriate level of technical staff, monitoring the quality of assignment completion and turnaround times for reviews, providing expert guidance on challenging project components, and keeping open communication regarding contract performance with City personnel.

Keys to Success – Quality Assurance and Control
 Project Kick-Off Meetings – All project team members will meet to discuss and clarify the project scope, schedule, and other pertinent information related to the service or project. This meeting is conducted upon receipt of the notice to proceed and prior to any work being performed. This meeting can be an in-person meeting or conference call depending on the complexity of the assigned project.  Continual Communication – The appropriate people from Willdan identified in the kick-off meeting are responsible for keeping the City up to date on project status and issues raised throughout the project.

This is accomplished through regular meetings, written status reports, or other means of communication requested.
 Periodic Updates through Project Status Meetings – At the project kick-off meeting, the project team determines and selects meeting dates throughout the project to discuss coordination, issues, changes, and other information necessary to keep the project on track in terms of quality, schedule, and budget.  Objective Review of Project by Peers – Prior to the submittal of a project to the City, appropriate staff members review the project to ensure all information is accurate. Willdan staff conducting these reviews are not directly involved with the project – enabling objectivity in the review. Depending upon the complexity of the project, the four levels of our quality assurance review for project deliverables may entail:
 Level 1 – peer review only
 Level 2 – peer review and editorial review (documents)  Level 3 – peer review, editorial review, and professional engineer review  Level 4 – all elements of Level 3 plus additional reviews by specific technical experts Following our keys to success, Vanessa will assign senior staff members experienced in the required disciplines and not directly involved in the assignments to implement project-specific quality assurance activities. Each senior member of staff will report directly to Vanessa but work closely with Tyrone and his Task Managers to ensure project objectives are met at project completion. Random audits will be conducted to ensure proper quality assurance activities have been accomplished with necessary corrective actions taken. These audits involve verifying task completion, validating the quality review, confirming comments resolution, and verifying that agreed-upon changes are reflected in each affected document. Vanessa will regularly seek feedback on how Willdan's team is performing and how we can improve upon the level of service.

F. Client References
Willdan’s most recent similar client references are provided on the following pages.

Proposal for On-Call Engineering Services 26
City of Paramount
Project Description
Willdan is providing civil engineering, traffic engineering, agency engineering, landscape design services, survey, contract administration, construction observation, utility coordination, federal labor compliance, pavement engineering, public works
permits/inspection, development review, CIP design/inspection, CDBG administration, grant writing, and NPDES.

Highlights
 Alondra Boulevard/Passage Avenue Traffic Signal Warrant Study
 Somerset Boulevard/Orange Avenue Left‐Turn Phasing Warrant Study
 Orange/Myrrh HAWK Signal Warrant Study
 2023 Engineering and Traffic Survey- 39 segments
 Merkel Neighborhood Traffic Calming Study
 City of Paramount Local Road Safety Plan
 Traffic Signal Inventory
 Traffic Control Plans for Encroachment Permits
 Developer Improvement Plans
 Metro I-710 ICM Project
 RMC Proposition 68 Grant Program Application (awarded $2.55 million)  Highway Safety Improvement Program Cycle 11 Applications (awarded $1.04 million)  Highway Safety Improvement Program Cycle 10 Applications (awarded $582,000)  Active Transportation Program Cycle 3 Grant Application (awarded $3.43 million)  California Natural Resources Agency Urban Greening Program (awarded $2.93 million)  Clean California Grant Application (award TBA)
 Alondra Boulevard Capacity Enhancement
Traffic Impact Study
 Alta (World) Energy Paramount Traffic Impact
Analysis Peer-Review
 Alondra Boulevard/Passage Avenue Traffic
Signal Design
 Garfield Avenue/70th Street Traffic Signal Design
 Paramount Swap Meet Driveway Study
Staff Included
 Tyrone Peter – PM
 Jeff Lau – PM
 Adel Freij – Client Manager
 Joe Bellomo
 Rafael Casillas – PM/City
Engineer
 Ron Stein – PM
 John Hidalgo – PM
 Mike Bustos
 Jocelyn Limas
 Dr. Chien-Chang Chen
 Christine Kudija
Contract Value
$775,000/yr
Successful Grants
$20,267,296
Years of Service
41 1983 to present
Reference Contact:

Adriana Figueroa
Public Works Director
16400 Colorado Avenue
Paramount, CA 90723
Phone: 562.220.2100
[email protected]

Proposal for On-Call Engineering Services 27
City of La Puente
Project Description
Willdan is providing as-needed city and traffic engineering services to the City of La Puente. In addition to providing extension of staff services, Willdan provides development reviews, engineering design, construction management, project management, development review, pavement engineering, funding administration, plan review, landscape architecture, surveying, and geotechnical engineering services throughout the city.

These services encompass – but are not limited to – study and report research and preparation; plan, specification, and cost estimate preparation; funding application research, preparation, and submittal; citizens' request and complaint investigations/resolutions; development impact studies; City staff, commissions, and council meeting attendance and participation; and City department coordination to implement desired City improvements and updates.

Highlights
 Valley Boulevard Retaining Wall Phases I, II, and III – design and construction management/inspection for a $3 million retaining wall spanning 3,000 feet in length and over 14 feet in height.  Amar Road Traffic Signal Modifications – traffic engineering design, utility coordination, and contract and funding administration for the City's $1 million program for nine traffic signal modifications and ADA-compliant ramp improvements along the arterial roadway.
 Nelson Elementary, Del Valley Elementary, and Sierra Vista Middle Schools Safe Routes to School Improvements – design, project management, and grant administration services for the City's $665,000 program to repair and infill sidewalks, upgrade signing and striping, and install in-roadway flashing lights and high-visibility crosswalks.

Staff Included
 Tyrone Peter – PM
 Jeff Lau– PM
 Adel Freij – Client Manager
 Joe Bellomo
 Rafael Casillas – PM
 Ron Stein – PM
 John Hidalgo – PM
 Mike Bustos – PM
 Dave Knell
 Dr. Chien-Chang Chen
 Christine Kudija
Contract Value
$1,700,000/yr
Successful Grants
$6,834,700
Years of Service
28 1996 to present
Reference Contact:

John DiMario
Community Development
Manager
15900 E. Main Street
La Puente, CA 91744
Phone: 626.855.1517
[email protected]

Proposal for On-Call Engineering Services 28
Project Description
Willdan provides as needed city, civil and traffic engineering services to the City of Los Alamitos. Willdan also provides review services for redevelopment projects, , provides inspections and issues public works permits within the City for public works requirements and provides oncall landscape design. Willdan performs map checking and improvement plan reviews for private developments within the City.

Willdan also provides design of Capital Improvement Projects for the City’s CIP Program. Willdan’s services also included conducting and presenting research, preparing plans, specifications, and cost estimates, researching and submitting funding applications, investigating and resolving citizens' requests and complaints, conducting development impact studies, attending and actively participating in City staff, commission, and council meetings, and coordinating with City departments to implement desired improvements and updates.

Highlights
 On-Call Landscape Design Services
 On-Call City Enigneering Services
 Traffic Engineer & Traffic Engineering Services
 Old Towne West traffic calming project provides innovative striping solutions to encourage safer streets for pedestrians and drivers  Worked with Orange County Sanitation District (OC San) on their current first-phase citywide sewer rehabilitation project. Willdan provides agency coordination, reviews, and inspections for this project.

We have reviewed plans and specifications for the second phase of the OC San citywide sewer work which will begin construction in late 2023.
 Rossmoor Sewer District citywide sewer improvements.
 605 Freeway Interchange at Katella Avenue street improvement project led by the Orange County Transit Authority (OCTA) and Caltrans
 Provide grant support services to the City of Los Alamitos, including CDBG. Willdan understands the request are for support of preparing grant applications and related services including grant reporting.  Measure “Y” Funded repavement/street improvements on nineteen (19) residential streets.

Staff Included
 Tyrone Peter – PM
 Jeff Lau – PM
 Adel Freij – Client Manager
 Joe Bellomo
 Rafael Casillas – PM
 Ron Stein – PM
 John Hidalgo – PM
 Mike Bustos– PM
 Dave Knell
 Dr. Chien-Chang Chen
 Christine Kudija
Contract Value
$900,000/yr
Grant Application
$5,000,000
Years of Service
24 2000 to present
Reference Contact:

Ron Noda
Deputy City Manager and
Development Services Director
3191 Katella Avenue, Los
Alamitos, CA 90720
Phone: 562.431.3538,
ext. 500
[email protected]
City of Los Alamitos

Proposal for On-Call Engineering Services 29
Project Description
Willdan provides on-call engineering and traffic engineering services through our staff augmentation and City Traffic Engineer contract. As City Traffic Engineer, Willdan reviews and make recommendations on residents' requests for stop signs, crosswalks, permit parking, and speed humps; reviews plans, specifications, and estimates for various projects; prepares staff reports and attends Parking and Traffic Commission meetings; prepares traffic signal and signing and striping plans, specifications, and estimates; prepares timing charts for citywide signal coordination timing and individual traffic signals; prepares studies for CMP, warrant analyses, traffic-calming measures, and other areas of concern. Willdan's traffic engineering staff members work directly with the City's Planning Department to review TIAs, develop MOUs, and review upcoming development plans. Services include preparing grants for Los Angeles County Metropolitan Transportation Authority's Call-for-Projects and the Highway Safety Improvement Program.

Highlights
 Willdan is providing professional engineering design services for First/Last Mile Improvement Project - Phase 1.
 Provide professional engineering design services for the preparation of PS&E on N Oak Street from Pine Street to the easterly boundary line of Rogers Park. The design is to provide 30-degree on street parking along the north side of N Oak Street.
 Preparation of drawings and specifications for the re-piping of the storm water drain lines throughout City Hall Task order 22-023-043. The work includes re-piping a variety of piping, new T-bar ceiling, drywall, new lighting systems and relining of pipe.
 Willdan Engineering will serve as project manager and compile and assemble bid document package.  Willdan provides professional design services for Aviation Boulevard. The design includes roadway resurfacing, new curb and gutter, sidewalks, ADA curb ramps, driveways, traffic signal upgrades, streetlighting upgrades, landscaping and Intelligent Transportation Systems (ITS) upgrades on Aviation Boulevard from Arbor Vitae to Manchester Boulevard.
 Provide grant support services to the City of Inglewood. Willdan understands the request are for support of preparing grant applications and related services including grant reporting.  Building Plan Review for Public Works Projects
 Part-Time (As-Needed) Code Enforcement Staffing
Staff Included
 Tyrone Peter – PM
 Jeff Lau – PM
 Adel Freij – PM
 Joe Bellomo
 Rafael Casillas – PM
 Ron Stein – PM
 John Hidalgo – PM
 Mike Bustos – PM
 David Knell
City of Inglewood
Contract Value
$1,400,000/yr
Successful Grants
$13,045,525
Years of Service
18 2006 to present
Reference Contact:

Peter Puglese
City Traffic Engineer
1 W. Manchester Boulevard,
Inglewood, CA 90301
Phone: 310.412.5333
[email protected]

Proposal for On-Call Engineering Services 30
 Dr. Chien-Chang Chen  Christine Kudija
Project Description
Willdan has provided the City with on-call planning, on-call city engineering, construction management and inspection, geotechnical engineering and materials testing, traffic and transportation engineering, drainage and flood engineering, water and wastewater engineering, grant application assistance, utility coordination, assessment district administration, user fee services, and overall project management and contract administration.

Highlights
 Willdan is providing professional traffic engineering design services for HSIP Cycle 11 Design and prepared the grant application for it.
 Stop Warrant Studies
 Water Quality Services for FY 2023 and 2024 and MS4 Permit Compliance
 Eastern Avenue Street Improvement Projects
 Citywide Battery Backup System Deisgn
 Gage Avenue Bus Shelter Improvement Project, including PS&E, Project Management, Contract Administration,
Construction Observation, Engineering Support, & Labor Compliance Services  Citywide LED Street Name Sign Project
 EV Charging Infrastracture Feasibility Study
Staff Included
 Tyrone Peter – PM
 Jeff Lau – PM
 Adel Freij – Contract Manager
 Joe Bellomo
 Rafael Casillas – PM
 Ron Stein – PM
 John Hidalgo – PM
 Mike Bustos – PM
 David Knell
 Dr. Chien-Chang Chen
 Christine Kudija
G. Rights to Materials
Willdan understands that all responses, inquiries, and correspondence relating to this RFP and all reports, charts, displays, schedules, exhibits, and other documentation produced by Willdan that are submitted as part of the Proposal and not withdrawn shall, upon receipt by City, become property of the City.

Contract Value
$1,200,000/yr
Successful Grants
$833,400
Years of Service
7 2017 to present
Reference Contact:

Javier Ochiqui
Contract & Facilities
Manager
6330 Pine Avenue
Bell, CA 90201
Phone: 323.588.6211
[email protected]
City of Bell
Proposal for On-Call Engineering Services
H. Schedule of Hourly Rates
** For Non-Prevailing Wage Project *** For Prevailing Wage Project Mileage/Field Vehicle usage will be charged at the rate in accordance with the current FTR mileage reimbursement rate, subject to negotiation.

Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A sub consultant management fee of fifteen percent (15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid March 2024 – March 2029, rates to be negotiated with City at three years. Thereafter, the rates may be raised once per year to the value between the 12-month % change of the Consumer Price Index for the Los Angeles/Orange County/Sacramento/San Francisco/San Jose area and five percent. For prevailing wage classifications, the increase will be per the prevailing wage increase set by the California Department of Industrial Relations. Rev V02 05.12.2023

WILLDAN ENGINEERING
Schedule of Hourly Rates
Effective March 2024

DESIGN ENGINEERING
Technical Aide I $77
Technical Aide II $100
Technical Aide III $120
CAD Operator I $126
CAD Operator II $146
CAD Operator III $162
GIS Analyst I $164
GIS Analyst II $180
GIS Analyst III $191
Environmental Analyst I $140
Environmental Analyst II $157
Environmental Analyst III $166
Environmental Specialist $180
Designer I $168
Designer II $174
Senior Designer I $184
Senior Designer II $193
Design Manager $191
Senior Design Manager $198
Project Manager I $177
Project Manager II $197
Project Manager III $207
Project Manager IV $223
Principal Project Manager $227
Program Manager I $197
Program Manager II $209
Program Manager III $228
Assistant Engineer I $145
Assistant Engineer II $162
Assistant Engineer III $170
Assistant Engineer IV $180
Associate Engineer I $189
Associate Engineer II $194
Associate Engineer III $196
Senior Engineer I $194
Senior Engineer II $198
Senior Engineer III $201
Senior Engineer IV $204
Supervising Engineer $209
Traffic Engineer I $209
Traffic Engineer II $223
City Engineer I $223
City Engineer II $227
Deputy Director $231
Director $237
Principal Engineer $257

BUILDING AND SAFETY
Assistant Code Enforcement Officer $103
Code Enforcement Officer $118
Senior Code Enforcement Officer $139
Supervisor Code Enforcement $168
Plans Examiner Aide $110
Plans Examiner $168
Senior Plans Examiner $184
Assistant Construction Permit Specialist $118
Construction Permit Specialist $124
Senior Construction Permit Specialist $146
Supervising Construction Permit
Specialist
$154
Assistant Building Inspector $139
Building Inspector $154
Senior Building Inspector $168
Supervising Building Inspector $184
Inspector of Record $196
Deputy Building Official $196
Building Official $198
Plan Check Engineer $192
Supervising Plan Check Engineer $194
Principal Project Manager $227
Deputy Director $231
Director $237

PLANNING
CDBG Technician $82
CDBG Specialists $98
CDBG Analyst $116
CDBG Coordinator $144
CDBG Manager $174
Housing Programs Coordinator $144
Planning Technician $123
Assistant Planner $154
Associate Planner $168
Senior Planner $191
Principal Planner $198
Planning Manager $211
Deputy Director $231
Director $237

ADMINISTRATIVE
Administrative Assistant I $95
Administrative Assistant II $114
Administrative Assistant III $133
Project Accountant I $107
Project Accountant II $125
Project Controller I $133
Project Controller II $150

CONSTRUCTION MANAGEMENT
Labor Compliance Specialist $139
Labor Compliance Manager $174
Utility Coordinator $167
Office Engineer I $140
Office Engineer II $159
Assistant Construction Manager $152
Construction Manager $176
Senior Construction Manager $191
Resident Engineer I $198
Resident Engineer II $206
Project Manager IV $223
Deputy Director $231
Director $237

INSPECTION SERVICES
Public Works Observer ** $125
Public Works Observer *** $151
Senior Public Works Observer** $136
Senior Public Works Observer *** $151

MAPPING AND EXPERT SERVICES
Survey Analyst I $143
Survey Analyst II $164
Senior Survey Analyst $187
Supervisor - Survey & Mapping $197
Principal Project Manager $227

LANDSCAPE ARCHITECTURE
Assistant Landscape Architect $146
Associate Landscape Architect $168
Senior Landscape Architect $184
Principal Landscape Architect $195
Principal Project Manager $227

APPPENDIX
Resumes
Tyrone Peter, PE
Director of Engineering
Tyrone Peter is an accomplished civil engineer for multi-discipline and multi-agency infrastructure projects. He is known for providing innovative, quality engineering services to ensure project delivery within budget and schedule. Tyrone has served as Project Manager or Civil Design Task Lead on 17 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract.

Tyrone’s years of experience managing and designing all types of public works projects provide him with a solid foundation to determine what is needed to deliver a successful project –making him the perfect fit to oversee an entire project, as well as perform specific civil engineering tasks. Tyrone’s comprehensive experience includes design of state highway, new street, street widening, street realignment, pavement rehabilitation, light rail and railroad, grade separation, flood control facility, water, and sewer projects. He has supervised feasibility studies, project study reports, project reports, construction document preparation as well as grade certification issuance, construction administration, and construction inspections. He is proficient at managing large project teams with subconsultants and multiple technical disciplines.

Relevant Project Experience
On-Call Engineering Services, City of Pico Rivera, CA. Project Manager. Willdan has provided general engineering services to the City of Pico Rivera for over 32 years. These services encompass CIP design and construction management and inspection, traffic engineering, public works permitting and inspection, development review, CDBG administration, grant writing, geotechnical engineering and materials testing, right-of-way engineering, drainage engineering; bridge and slope repair, environmental compliance and planning, energy auditing, and NPDES services to name a few. Under these discipline services, Willdan performs study and report research and preparation; plan, specification, and cost estimate preparation; funding source and availability consultation; development impact study research; plan checking; and City department coordination to implement desired City improvements and updates. Tyrone’s projects include:
 HSIP 7 TS Project  Pico Rivera On-Call Contract
 Rosemead Blvd & Whittier  Citywide Pavement Rehab
 Rosemead & Washington  Pico Rivera - CHSRA Plan
 Rosemead Blvd & Slauson  Maintenance Yard General
 Survey Manzanar Between
Telegraph Rd. & Flossnoor Rd.
 FY22-Citywide Street
Rehabilitation
 Pico Rivera Parking Lot  Whittier Underpass Repair
 Pico Rivera ADA & SW  TRH Bridge Repair
 Water Well #3 Plan Review  Pressure Relief Valve
 Senior Cnt Bathroom ADA

EDUCATION
BS, Engineering and Civil
Engineering, Tamil Nadu
College of Engineering
Civil Engineering,
Murugappa Polytechnic

REGISTRATIONS /

CERTIFICATIONS
Civil Engineer, California
No. 81888
18 YEARS OF EXPERIENCE
On-Call Engineering Services, City of El Monte, CA. Project Manager. Willdan provides on-call engineering services to the City of El Monte for projects such as commercial, industrial, residential and public works improvements. Plan documents are reviewed to ensure that the proposed developments and the associated improvements are designed in accordance with City-accepted standards, Los Angeles County Hydrology Manual, Los Angeles County Low Impact Development Manual, as well as other applicable design standards adopted by the City Council.

The CA Construction General Permit is used for SWPPP reviews in conjunction to water quality compliance for construction sites. Plans are also reviewed for grading, drainage and accessibility requirements.

On-Call City Engineering Services, City of Ridgecrest, CA. Project Manager/Civil Task Manager. Willdan has been providing the City of Ridgecrest with as-needed multi-disciplinary engineering services since 2010 and presently provides engineering services for various public works projects. Under our on-call contract, Willdan provides design engineering, environmental compliance, bidding assistance, construction management and inspection, material testing, surveying, special funding administration, labor compliance, pavement management, land development plan check, right-of-way acquisition with legal descriptions, and assessment district engineering for improvements throughout the City of Ridgecrest.

Orange Line Extension, Brutoco Engineering & Construction, Inc.; Los Angeles County Metropolitan Transportation Authority, Los Angeles, CA. Civil Design Task Manager. Willdan provided engineering design services for the design build team led by Brutoco Engineering. The design build project extended from Chatsworth Station to the Canoga Station in the San Fernando Valley along Canoga Avenue. The dedicated roadway was 28 feet wide in most locations consisting of two 14-foot travel lanes. At stations the busway lane was widened to provide passing lanes for buses. The 28-foot-wide roadway was located within Metro's rightof-way which was 100 feet wide in most locations. This provided adequate room within the right-of-way for landscaping as well as space for fences, privacy walls, drainage facilities, and a bikeway/pedestrian path. The busway was designed for potential future conversion to light rail transit service. A Class I bikeway which included a pedestrian path was designed and constructed within Metro's right-ofway from the terminus of the existing MOL bikeway/pedestrian path at Canoga Avenue north to Lassen Street and along Lassen Street to connect within the existing bike path on the east side of the existing Browns Creek drainage channel.

Firestone Boulevard Regional Corridor Capacity Enhancement, City of South Gate, CA. Project Manager. Willdan is providing engineering services for improvements between Alameda Street and Hunt Avenue. The $15.4 million design and construction project increase street capacity to six lanes; rehabilitates street pavement sections, including localized failed-roadway removal and replacement; installs landscaped and hardscaped medians utilizing drought-resistant plants and irrigation and lighting systems; reconstructs deficient sidewalk, curb, gutter, driveway approaches, and ADA noncompliant curb ramps; and plants parkway trees with no irrigation.

Jeffrey Lau, PE, TE, ENV SP
Deputy Director
Jeffrey Lau is an accomplished engineer for multi-discipline and multi-agency traffic and transportation projects such as traffic signals, signing and striping, street lighting, and construction traffic control. Jeff has served as Traffic Task Lead on 24 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract. He oversees transportation design for Willdan's traffic engineering group and manages a variety of large- to small-scale projects.

His responsibilities include the coordination, analysis, and design of various transportation projects such as the preparation of plans, specifications and estimates (PS&E); field investigations; and traffic data collection. He has also assisted with traffic impact studies and analyses, plan reviews, and engineering and traffic survey updates. Jeffrey’s extensive hands-on traffic engineering background encompasses designs for 400+ new and modified traffic signal installations, street lighting inventories for master plans, lighting design plans, street lighting conversions, and street lighting LED upgrades.

Jeffrey understands the importance of meeting schedules and developing the most cost-efficient projects to meet budgetary constraints. He has assisted clients with developing grant funding applications for various local, state, and federal grant programs – successfully securing funding through the Active Transportation Program (ATP) and the Highway Safety Improvement Program (HSIP).

Relevant Project Experience
On-Call Traffic Engineering Services, City of Paramount, California. Project Manager. Responsible for providing professional traffic engineering services to the City of Paramount on a routine basis. Duties included field reconnaissance and data collection; resident request investigations and work order preparation; traffic signal, signal interconnect, signing and striping, and traffic control plan reviews; funding documents preparation to request reimbursement of federally funded projects; and traffic and civil improvement conceptual design plans and council exhibit preparation.

On-Call Traffic Engineering Services, City of Pico Rivera, CA. Project Manager.

Willdan is serving as City Traffic Engineer and provides on-call traffic engineering services. Typical duties include design oversight, response to residents’ and businesses’ requests, review of traffic and parking impact studies, review of development projects, development of “conditions of approval”, review of traffic signal and traffic control plans, preparation of work orders, operational analysis, development of City’s Neighborhood Traffic Calming program, attendance at City Council and Planning Commission meetings as requested.

City Traffic Engineer/On-Call Traffic Engineering, City of Inglewood, California.

Task Manager/Project Traffic Engineer responsible for traffic studies and design services through our staff augmentation City Traffic Engineer contract. Willdan staff review and make recommendations on residents' requests for stop signs, crosswalks, permit parking, and speed humps; review plans, specifications, and

EDUCATION
BS, Civil Engineering,
California State Polytechnic
University, Pomona, CA

REGISTRATIONS /

CERTIFICATIONS
Traffic Engineer, California
No. 2835
Civil Engineer, California
No. 83887
Civil Engineer, Colorado
No. 56366
Civil Engineer, Washington
No. 58065
Civil Engineer, Arizona No.
70072
Civil Engineer, Texas No.
140012
Civil Engineer, Nevada No.
28303
Civil Engineer, Minnesota
No. 59453
Civil Engineer, Florida No.
91068
Envision Sustainability
Professional, Institute for
Sustainable Infrastructure
No. 45376

AFFILIATIONS
American Public Works
Association
20 YEARS OF EXPERIENCE
estimates for various projects; prepare staff reports; attend Parking and Traffic Commission meetings; prepare traffic signal and signing and striping plans, specifications, and estimates; prepare timing charts for citywide signal coordination timing and individual traffic signals; prepare studies for CMP, warrant analyses, traffic-calming measures, and other areas of concern.

On-Call Traffic Engineering Services FY 2016-2017, City of Rancho Palos Verdes, CA. Plan Check Engineer. Willdan provides city traffic engineering services to the City of Rancho Palos Verdes. Duties include preparing traffic studies and reports, investigating citizens' requests, reviewing traffic impacts of developments, plan check traffic control for permit process, preparing staff reports and attending Traffic Commission meetings and working with Public Works staff in implementing traffic-related projects. Willdan prepared a variety of traffic studies for the City, such as stop signs, traffic signals, school circulation, school pedestrian safety, crosswalks/enhanced crosswalks, Engineering & Traffic Surveys to set speed limits, permit parking, sight distance, and safety improvements at intersections and on roadway segments.

Malvern Street Rehabilitation, City of Buena Park, CA. Designer/Traffic Task Manager. Willdan provided engineering design services for the preparation of plans, specifications, and cost estimates (PS&E), traffic control plans, pavement engineering, and utility coordination for the pavement rehabilitation of Malvern Avenue from West City Limits to East City Limits, approximately 1.75 miles. The project improvements included pavement rehabilitation, curb and gutter replacements, sidewalk repair, upgrade of curb ramps to be ADA-compliant, driveway repairs, replacement of slotted cross gutter and spandrels, thermoplastic striping, and signage. Willdan evaluated bicycle facilities and installed Class II bike lanes while maintaining on-street parking and roadway capacity. The objectives of the project were to enhance pavement conditions, improve existing drainage issues, address accessibility definitions, and improve safety for all roadway users.

Piuma Road Signing and Striping, County of Los Angeles, CA. Senior Engineer.

Willdan provided professional engineering design services for the Piuma Road - Malibu Canyon Road to Rambla Pacifico Street Project. The project involved analyzing the existing signing and striping and providing recommendations for the curve warning signs based on the 2012 California Manual on Uniform Traffic Control Devices (CA MUTCD) and preparation of the signing and striping plans for their implementation. Willdan conducted field work to obtain all existing signs, striping, marking, object markers, delineators, and guardrails along the route. Global Positioning System * GPS) coordinates were provided for all existing signs, object markers, delineators, and guardrail locations. Centerline radii were provided for all curves along the project limits. We utilized the Trimble Juno GPS handheld to identify the location of the existing signs, with an electronic ball bank indicator, a GPS receiver and a tablet PC running the TxDOT TRAMS software. Willdan provided signing and striping plans and provided the proposed location of the advisory speed signs for all curves utilizing the traditional ball-bank indicator method as described in the CAMUTCD.

Vanessa Muñoz, PE, TE
President/CEO
Vanessa Muñoz is an accomplished engineer for multi-discipline and multi-agency traffic and transportation projects. Vanessa oversees 500 team members and 200+ active on-call agreements. She has designed 1,000+ signalized intersections and supervised completion of 2,000+ projects for a variety of large- to small-scale projects. Vanessa has served as Project Manager or Traffic Engineer on 29 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract. Her traffic engineering and transportation planning expertise includes traffic impact studies, engineering and traffic surveys, design and operations, municipal engineering, and operational analyses. Vanessa is highly skilled in analysis, coordination, and preparation of plans, specifications, and estimates for traffic signals, signing, striping, traffic control, flashing beacons, street lighting, interconnect, parking lots, street widening, and resurfacing projects. She has performed street lighting inventories for master plans, developed design plans, and performed energy audits for street lighting conversions and street lighting upgrades. She serves on an on-call basis as the City Traffic Engineer for the Cities of Rolling Hills and Inglewood and has served in a traffic engineer capacity or as City Traffic Engineer for the Cities of Arcadia, Camarillo, Fontana, and Rialto.

Relevant Project Experience
On-Call Traffic Engineering Services, City of Paramount, California. Project Manager. Responsible for providing professional traffic engineering services to the City of Paramount on a routine basis. Duties included field reconnaissance and data collection; resident request investigations and work order preparation; traffic signal, signal interconnect, signing and striping, and traffic control plan reviews; funding documents preparation to request reimbursement of federally funded projects; and traffic and civil improvement conceptual design plans and council exhibit preparation.

On-Call Traffic Engineering Services, City of Pico Rivera, CA. Project Manager.

Willdan is serving as City Traffic Engineer and provides on-call traffic engineering services. Typical duties include design oversight, response to residents’ and businesses’ requests, re view of traffic and parking impact studies, review of development projects, development of “conditions of approval”, review of traffic signal and traffic control plans, preparation of work orders, operational analysis, development of City’s Neighborhood Traffic Calming program, attendance at City Council and Planning Commission meetings as requested.

City Traffic Engineer/On-Call Traffic Engineering, City of Inglewood, California.

Task Manager/Project Traffic Engineer responsible for traffic studies and design services through our staff augmentation City Traffic Engineer contract. Willdan staff review and make recommendations on residents' requests for stop signs, crosswalks, permit parking, and speed humps; review plans, specifications, and estimates for various projects; prepare staff reports; attend Parking and Traffic Commission meetings; prepare traffic signal and signing and striping plans,

EDUCATION
BS, Civil Engineering,
California State Polytechnic
University, Pomona, CA

REGISTRATIONS /

CERTIFICATIONS
Traffic Engineer, California
No. 2341
Civil Engineer, California
No. 67583
Civil Engineer, Arizona No.
68013
Civil Engineer, New York
No. 100969
Civil Engineer, Colorado
No. 56033

AFFILIATIONS
City Traffic Engineers
American Public Works
Association
Institute of Transportation
Engineers

26 YEARS OF EXPERIENCE
specifications, and estimates; prepare timing charts for citywide signal coordination timing and individual traffic signals; prepare studies for CMP, warrant analyses, traffic-calming measures, and other areas of concern.

Peck Road Traffic Signal Synchronization, County of Los Angeles, CA. Project Manager. Willdan provided professional traffic engineering services for the Peck Traffic Signal Synchronization Project. The services include meetings and project coordination with LACO and the various municipalities involved (El Monte, South El Monte, Industry and Caltrans) as well as field review, equipment inventory, Report for recommended improvements, traffic signal base plans, traffic signal improvements plans and traffic signal utility plans for 26 signalized intersections along Peck Road corridor.

Paramount Boulevard Traffic Signal Upgrades & Safety Enhancements, City of Downey, CA. Principal-in-Charge/Quality Assurance Manager. Willdan prepared plans, specifications, and cost estimates; conducted an environmental analysis; and performed a traffic safety assessment for 13 traffic signal upgrades and safety enhancement improvements between Gardendale Street and Telegraph Road. The project's goal was to improve traffic safety along Paramount Boulevard by upgrading the traffic signal and installing new controllers, controller cabinets, battery back-up systems, signal hardware equipment, LED safety lighting, and inter-section pedestrian countdown signal heads. Other safety enhancements encompassed installing ADA-compliant curb ramps to improve pedestrian and cyclist safety. All improvements have increased traffic signal visibility, facilitated safer turning movements, and reduced pedestrian- and cyclist-involved vehicle collisions. Willdan prepared both NEPA and CEQA documentation for the environmental approval and processed grant funding documentation for preliminary engineering, right-of-way certification, and request for construction authorization.

Amar Road Corridor Traffic Signal Modifications/Safety Improvements, City of La Puente, CA. Principal-in-Charge/Quality Assurance Manager. The City was awarded $1 million of HSIP Cycle 6 funding to modify traffic signals along the Amar Road corridor at nine intersections. The improvements encompassed upgrading traffic signal poles, controller cabinets, vehicle and pedestrian signal heads, and pedestrian push buttons; implementing protected left-turn phasing; and installing ADA-compliant access ramps to improve safety and comply with current ADA standards. NEPA and CEQA documentation was prepared and processed to obtain necessary environmental approvals. Willdan utilized the documentation as part of the HSIP grant application process for preliminary engineering, right-of-way certification, and request for construction authorization.

La Brea HSIP Improvements & Prairie HSIP Improvements, City of Inglewood, CA. Principal-in-Charge/Quality Assurance Manager. Willdan is providing engineering design services for the Highway Safety Improvement Project (HSIP) – Cycle 8. The City received two grants for the Highway Safety Improvements the La Brea HSIP Grant (H8 07 012 City Project No P621) is for 193800 and the Prairie Ave HSIP Grant (H8 07 013 city Project No P652) is for 875400.

Ron Stein, PE, ENV SP
Preliminary Engineering and Planning Studies |
Design | Bid Support Services | Construction
Support Services
Mr. Ronald Stein has 12 years of experience as a project manager, civil engineer, and QA/QC plan reviewer for various municipalities, including 3 years of public works experience with the Florida Department of Transportation (FDOT). Ron has served as Project Manager or Civil Design Lead on 7 contracts for the City of Pico Rivera including the On-Call Traffic Engineering Services contract. He has led land development engineering teams engaged in the design of projects encompassing grading, erosion control, street improvements, striping, traffic control, storm drains, and utilities. Throughout all stages of design, he has conducted meticulous QA/QC plan reviews to ensure every submittal was a quality product that adhered to all local agency standards. He is also skilled in the development and review of hydrology/hydraulic calculations and reports, cost estimates, stormwater pollution and prevention plans (SWPPPs), water quality management plans and erosion and sediment control plans.

During his time in land development, Ron has worked on a wide array of projects including residential developments, commercial developments, healthcare facilities, universities, stadiums, solar farms, warehouses, and naval facilities. He also brings valuable public works experience from FDOT, where he rotated through every office of the department to create a strong technical foundation from all perspectives throughout the full project lifecycle. Throughout this time, his focus was in construction, where he conducted multiple constructability plan reviews on projects before they went to bid. Ron’s experience in the design and construction of private and public works projects will add value to the City’s plan review process from the perspective of constructability and value engineering.

Relevant Project Experience
Roadside Drive Bridge Widening, City of Agoura Hills, CA. Civil Project Engineer responsible for oversight of production of all final plans, specifications, and estimates for the federally funded widening improvements. The four-span reinforced-concrete slab bridge – constructed in 1964 – is located approximately 0.3 miles east of Kanan Road and crosses Medea Creek. Two east/west traffic lanes provide a travel width of 24 feet. Narrow approaches create traffic bottlenecks in both directions. The bridge has 2-foot-wide sidewalks on the north and south sides with no pedestrian walkway at the west approach. Based upon a Caltrans inspection report, the bridge has a sufficiency rating of 78.6 and is classified as functionally obsolete due to poor deck geometry and the narrow travelways.

Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood, CA. Project Manager responsible for overall project management and oversight of final engineering design services required for 1½-mile complete street/green street improvements between the north City limit and Del Amo

EDUCATION
BS, Civil Engineering,
Florida State University
Tallahassee

REGISTRATIONS /

CERTIFICATIONS
Civil Engineer, California
No. 86877
ENV SP, Institute for
Sustainable Infrastructure
No. 56028
12 YEARS OF EXPERIENCE
Boulevard to provide for a regional bicycle path in compliance with the Gateway Council of Governments Active Transportation Plan and improve pedestrian access to retail/commercial establishments. The design entailed coordination of pedestrian and bicycle movements into the current County Traffic Signal Synchronization Program, undergrounding utility distribution and transmission, Green Streets storm water quality treatment, and drought-tolerant landscaping. Other improvements involved upgraded traffic signal equipment to improve safety, bicycle parking and lockers, improved transit stops, sidewalk additions within the corridor to meet ADA requirements, street resurfacing, and irrigation. Willdan provided preliminary and final design, NEPA/CEQA documentation and permitting, transit partnering outreach, Corridor Committee meeting participation, and construction funding application preparation.

Urban Green Bicycle Trail, City of Lynwood, California. Project Drainage Engineer responsible for design of all drainage and water quality improvements required for the 1.2-mile-long project. Willdan is designing a sustainable, integrated, and efficient bicycle trail on undeveloped Caltrans excess land adjacent to Interstate 105 between Atlantic Avenue and Birch Street. Amenities for the project encompass a bio-swale to reduce storm water runoff, drought-tolerant plants, safety and visibility lighting, and permeable pavers.

Via Vaquero Road Storm Drain Repairs, De Luz Community Services District, Murrieta, CA. Project Manager responsible for overall project management and oversight of services required for the storm drain repairs. The District required the repairs due to a washout of two separate culverts and roadway segments on Via Vaquero Road just south of Sandia Creek Drive. Final design plans, specifications, and estimates will be developed, designed, and produced into a construction document packet for bidding. A geotechnical investigation will be performed to ensure proper backfill requirements and adequate pavement sections are incorporated into the design. A drainage investigation will be conducted on culverts to ensure they are adequately sized and existing drainage patterns will not be disrupted. These repairs will include grading and other control measures to mitigate potential erosion.

District-Wide Storm Drain Repairs, De Luz Community Service District, Murrieta, CA. Project Manager responsible for project management and oversight of all services required for FEMA-funded storm drain improvements at 57 locations identified by the District's maintenance team. Final design plans, specifications, and estimates were developed for each location to provide proper drainage for those areas. The work involved paving, curb and gutter, drain basins, CIPP lining, storm drain improvements, head walls, and grading to ensure proper conveyance of runoff to existing drainage facilities. Hydrologic analyses were required for each site to maintain and improve the existing drainage course. Coordination with FEMA was performed to ensure compliance with funding requirements.

Highway Safety Improvement Cycle 8 Design, City of La Puente, CA. Civil Engineering Task Manager responsible for management of preliminary engineering design, utility coordination, contract administration, and funding administration improvements at eight crosswalk locations throughout the city.

Jocelyn Limas, PLS
Surveys, Mapping and Field Reviews | Right of
Way Phase & Determination
Ms. Jocelyn Limas has 20 years of experience providing design support to a variety of projects at different levels. Her professional background includes drafting and design of residential and commercial land development projects, survey-related drafting, project management experience, supervisor-level survey experience with heavy emphasis on title research, legal descriptions, boundary determinations, and compliance with both State and local ordinances.

Relevant Project Experience
On Call Professional Land Surveying Services for Public Works, City of Fresno, CA. Contract Land Surveyor. Land title research, boundary rectification, subdivision mapping review, records of surveys, corner records, monument placement, deed preparation, legal description preparation and review.

Paramount Engineering Services FY 2024, City of Paramount, CA. Contract Surveyor. Provide general engineering services to the City of Paramount.

County of Madera Acting County Surveyor, CA. Contract County Surveyor Willdan performed all duties of the County Surveyor for the County of Madera.

Duties included the review and analysis of the operations of the County Surveyor function review of maps and legal descriptions and related duties.

La Habra Bishop Sanitation District, CA. Contract Surveyor. Willdan is providing the necessary professional engineering services to realign the proposed storm drain system within the exiting channel alignment. Willdan is preparing a bid document with alternatives to lower the cost of the E. Bishop Storm Drain project and decrease the potential long lead time for the materials (elliptical pipe).

City of Ione On-Call Services, City of Ione, CA. Contract City Surveyor. City Engineering services for the City of Ione. Services may include design and construction management.

Building & Safety Services, City of Rancho Cordova, CA. Contract Surveyor.

Provide building and safety services to include Building Official Services, Plan Review Services, Inspection Services, and Permit Technician Services.

Plan Checking, City of Lake Elsinore, CA. Contract Surveyor. Willdan is providing on-call plan checking services and assisting in streamlining the review process for the City of Lake Elsinore. Willdan is reviewing grading plans, erosion and sediment control, soils reports, street improvement plans,* water plans, landscape plans, hydrology reports, street improvement plans, traffic plans and studies, survey documents, WQMP's, SWPPP's, and structural plans. Willdan will review plans to ensure everything is up to code and fits in with the City's master plan. Willdan will assist the City in upgrading to electronic plan review.

Plan Checking and Development Services, City of Elk Grove, California.

Contract City Surveyor and Survey/Mapping Reviewer responsible for performing

EDUCATION
AS, Sociology, College of
the Sequoias, Visalia
Continuing Education -
Subdivision Map Act Class

REGISTRATIONS /

CERTIFICATIONS
California Professional
Land Surveyor, No. 9596
FAA Remote Pilot License,
Certification No. 4080288
20 YEARS OF EXPERIENCE
reviews for improvements throughout the city. Provided surveying and mapchecking services in support of the city processing applications for multiple residential and commercial developments.

County of San Bernardino Map Checking Services, San Bernardino, CA.

Contract Surveyor. Willdan provided map checking services to the County of San Bernardino.

Development Services FY15-16, City of Cerritos, CA. Willdan provided professional engineering plan check services for civil related disciplines for the City of Cerritos. We performed complete plan check services to ensure that the proposed developments and the associated improvements are designed in accordance with City accepted standards including the Los Angeles County Hydrology Manual, Los Angeles County Low Impact Development Manual, as well as other applicable design standards and the Conditions of Development approved by the City Council and Planning Commission for each development.

On Call Engineering Services, City of Napa, CA. Willdan is providing engineering and surveying plan checking services for a variety of development project submitted to the City of Napa. Projects have included residential commercial and industrial projects of a variety of sizes. Recent projects have included review of site development and public infrastructure for a new Ritz Carlton hotel a new 37 lot subdivision with hillside development and a new commercial development for two chain restaurants and a low income housing project. Most notably, Willdan has provided engineering plan review services on the Napa Pipe Redevelopment Project. Willdan has provided plan review for the following development projects:

Anderson Ranch, Soscol Corner, Napa Courtyards, Redwood Grove, Redwood Duets Subdivision, Manzanita Family Apartments, Keller Apartments, Bridgeview Apartments, Caritas Apartments, Vista Tulocay Phase II, and Napa Pipe Redevelopment .

On-Call Plan Check Services 19/20, City of South Gate, CA. Willdan provided multi-disciplinary plan check including Parcel Maps, Tract Maps, Annexations, Lot Line Adjustments, and Mergers to the City of South Gate.

Survey and Mapping Services, City of Woodlake, California. Contract City Surveyor responsible for performing reviews for public improvements throughout the city.

Survey and Mapping Services, City of Farmersville, California. Assistant City Surveyor responsible for performing reviews for public improvements throughout the city.

QK Inc, Visalia CA. Senior Associate Surveyor, Project Manager, UAV Manager.

Defined and monitored project scope, schedule and budget, including implementing relevant, trend-based measurements to reflect the state of project activities and achievement of clients’ expectations. Was responsible for monitoring the completion of QA/QC forms for all deliverables and coordinated the schedule with other QA/QC reviewers at various points throughout the project development.

Salvador Lopez Jr.

Director of Planning
Mr. Salvador Lopez, Jr. has 24 years of planning experience that spans all aspects of planning, including current, advance, and environmental planning, as well as active transportation planning and housing and community development. He is highly experienced at managing multi-disciplinary teams in the development of policy and long-range planning documents for public agencies.

Relevant Project Experience
Mayfair Park Storm Water Runoff Capture, City of Lakewood, CA.

Environmental Compliance Task Leader responsible for providing and overseeing all environmental services required for stormwater runoff improvements. The project involved diverting water from the nearby Los Angeles County flood control channel into pretreatment devices, such as a hydrodynamic separator, to remove the trash, debris, and sediment before conveying water into a large, buried multi-chambered storage/infiltration facility with a targeted storage capacity of 8 acre-feet. The City of Lakewood studied two park locations - Mayfair Park and Bolivar Park - for suitable locations that would benefit from the improvements.

Special Project Planning Services, City of Artesia, CA. Program Manager responsible for overall on-call project assignment management and oversight for staffing resources provided to the City. Serves as Case Planner responsible for reviewing and processing land use entitlement applications; preparing general plan text or map amendments; preparing or amending specific plans; preparing zoning code text or map amendments; and preparing related environmental studies.

Performance of these responsibilities requires expertise and knowledge in general plan compliance and implementation, CEQA/NEPA conformance, project management, and general planning procedures. Representative projects include the Artesia LIVE II Application Processing, Specific Plan, and IS/MND.

Lakewood Boulevard Capacity Enhancement Project, City of Lakewood, CA.

Environmental Task Manager. Willdan was selected to prepare an Initial Study Checklist and a Mitigated Negative Declaration (IS/MND) pursuant to the California Environmental Quality Act (CEQA) for the proposed Complete Street/Green Street Improvements on Lakewood Boulevard between the north City Limits and Del Amo Boulevard. This project is funded by Metro Measure "R" I/91/605 Hot Spots Expenditure Plan funds.

Fortin Street Development Application Processing and IS/MND, City of Baldwin Park, CA. Project Manager responsible for overall project management and oversight to process an application and preparing an initial study/mitigated negative declaration for a tentative tract map to subdivide four residential properties on 1.75 acres into 15 residential lots as a planned unit development.

Firestone Boulevard Capacity Enhancement, City of South Gate, CA.

Environmental Compliance Task Leader responsible for providing and overseeing all environmental services required for the corridor improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from four to

EDUCATION
BS, Urban & Regional
Planning, California State
Polytechnic University,
Pomona, CA
24 YEARS OF EXPERIENCE
six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach reconstruction; ADAcompliant ramps; parkway trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and drainage engineering; landscape architecture, survey, and right-of-way engineering; and utility relocation.

Garfield Avenue Corridor Improvements, City of Paramount, CA.

Environmental Compliance Task Leader responsible for providing and overseeing all environmental services required for street improvements between the north City and the south city limits. The design involved street widening to accommodate a third lane in each direction; street resurfacing; two concrete intersections; concrete sidewalk, curb and gutter, and driveway approach reconstruction; catch basin construction; streetscape improvements for raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic signal modifications at nine locations along the Garfield Avenue corridor. Services included civil, traffic, and drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement management.

On-Call Planning Services, City of El Monte, CA. Contract Planner responsible for contract planning services emphasizing discretionary case processing and longrange advanced planning programs. Programs involved land use planning; complex land use development projects; general administration of City-initiated planning work and studies; conceptual plans; land use entitlement applications; general plan, specific plan, and zoning code updates and map amendments; and initial studies under the California Environmental Quality Act and related environmental documents. Also responsible for preparing all associated staff reports, resolutions, and ordinances.

Planning Services, City of Hawaiian Gardens, CA. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Staff planners assist with processing development applications and other dayto-day planning activities, including - but not limited to - land use entitlements, special projects, CEQA administration, casino project management, and successor agency management.

Contract Planning Services, City of Long Beach, CA. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Staff planners assist with current planning, advance planning, special projects planning, development project review, entitlement processing, CEQA document preparation and review, historic assessments, community outreach, and other long-range planning activities.

Contract Planning Services, City of Cudahy, CA. Project Manager responsible for overall project management and oversight for staffing resources provided to the City. Staff provides full-time contract planning services for the City's Planning Division as well as for Interim Community Development Director.

On-Call Planning Services, City of Willows, CA. Project Manager responsible for overall project management and oversight for staffing resources provided to the City.

Tamara Boeltl
Utility Coordinator
Ms. Tamara L. Boeltl is responsible for the mapping of plans for various projects undertaken by Willdan. She is computer literate in GIS, CAD, Microsoft PowerPoint, Visio, Illustrator, and Adobe PhotoShop, as well as a variety of spreadsheet and word processing software. Ms. Boeltl has more than seven years of graphics experience including coordination of computer graphic displays, presentation layouts, brochure design, slide creation, and GIS mapping. Her public counter duties consisted of explaining public works codes, ordinances, and requirements to owners, contractors, and the general public. Additionally, Ms. Boeltl reviewed applications, issued permits, maintained records, and prepared status reports for the building and safety departments. She also conducted plan check for minor public works projects. Ms. Boeltl performed all duties on an interim basis for the Cities of Claremont, El Segundo, Hidden Hills, La Habra Heights, Lancaster, and the County of Santa Cruz. Another specialized service Ms. Boeltl has performed for the Cities of Hemet and Indian Wells is counter procedure assessment, preparation of counter manual, and additional staff training.

Relevant Project Experience
Roadside Bridge Widening, City of Agoura Hills, CA. Willdan is providing structural civil and traffic engineering design and other appurtenant services for the federally funded widening. The four span reinforced concrete slab bridge – constructed in 1964 – is located approximately 0.3 miles east of Kanan Road and crosses Medea Creek. Two eastwest traffic lanes provide a travel width of 24 feet.

Narrow approaches create traffic bottlenecks in both directions. The bridge has 2- foot-wide sidewalks on the north and south sides with no pedestrian walkway at the west approach. Based upon a Caltrans inspection report the bridge has a sufficiency rating of 78.6 and is classified as functionally obsolete due to poor deck geometry and the narrow travelways.

Studebaker Road and Rosecrans Boulevard Hot Spots Arterial Intersection Improvement Project, City of Norwalk, CA. Willdan was selected to provide professional engineering design services for the preparation of plans specifications and estimates (PS&E) for the street improvements at Studbaker Road and Rosecrans Boulevard.

On Call Landscape Architectural Services, City of Paramount, CA. Willdan was selected to provide professional engineering design services for the preparation of plans specifications and estimates (PS&E) for the street improvements on Centinela Avenue from La Cienega Boulevard to Florence Avenue.

Street Improvements and Traffic Signal Modifications on Centinela Avenue for the Highway Safety Improvement Program (HSIP), City of Inglewood, CA. The Centinela Avenue resurfacing project will be packaged as a single project for construction advertisement. Although both projects will be bid together as one bid package separate bid schedules will be prepared for federally funded and nonfederally funded components of the project.

EDUCATION
General Education,
Moorehead State
University, Minnesota
Blueprint Reading,
Fullerton Community
College, Fullerton
Building Construction,
Pasadena Community
College, Pasadena
Business English, Rio
Hondo College, Whittier
35 YEARS OF EXPERIENCE
Lower Azusa Road-Los Angeles Street from Rosemead Boulevard to Main Avenue Traffic Signal Synchronization Project, City of Alhambra, CA. Willdan is providing professional traffic engineering services including meetings and project coordination with LACO and the various municipalities involved (Arcadia El Monte Baldwin Park Rosemead Temple City Irwindale and Caltrans). For 29 signalized intersections along the Lower Azusa Road-Los Angeles Street corridor, conducted field review and an equipment inventory report for the recommended improvements, traffic signal base plans, traffic signal improvements plans, and traffic signal utility plans.

Supportive Engineering Services, City of La Puente, CA. Willdan is providing supportive engineering services including third-party review of geotechnical reports and grading plans and specifications submitted to the City. The review is performed to ensure that the submittals comply with the City’s guidelines and applicable codes.

Hot Spots Improvements, City of Pico Rivera, CA. The project included increased left turn storage, additional left turn lanes, additional through travel lanes, dedicated right turn pockets, reconstruction of existing medians to accommodate additional travel lanes, modifying existing traffic signals and striping, pavement rehabilitation, construction of curb ramps, driveway approaches and miscellaneous sidewalk improvements.

City of El Monte Santa Anita Active Transportation Project, City of El Monte, CA. Willdan provided engineering design services for the preparation of plans, specifications, and cost estimates (PS&E) and related construction documents. The project improvements include pedestrian and bicycle safety enhancements, Class II bike lanes, Class III bike routes, bicycle video detection, pedestrian countdown signal heads, thermoplastic striping upgrades, ADA curb ramps, and wayfinding improvements along Santa Anita Avenue, Tyler Avenue, and Ramona Boulevard.

Concrete Repair Project, City of Pico Rivera, CA. Prepared specifications, typical sections, construction details, cost estimates and bid documents for the city-wide concrete repair. The project consisted of the removal and replacement of the damaged curb and gutter sidewalk driveways and AC pavement. The project was funded through Community Development Block Grant (CDBG).

LA River Catch Basin Retrofit, Los Angeles Gateway Region, CA. Willdan provided engineering services to the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (JPA) for the installation of full capture catch basin trash and debris system. The catch basins are located within the Los Angeles River Watershed of 16 Gateway Cities. Willdan services included inventory and field survey of existing catch basins research and data gathering permit coordination and processing data inputting and preparation of plans specifications and estimate.

Lani Alfonso, PE
Construction Phase Authorization | Grant
Administration
Ms. Lani Alfonso is a Willdan Engineering city engineer with over 32 years of experience in public works engineering and project management who combines excellent communication and management skills with analytical and technical qualifications. She is experienced in administrative filings and reporting for a variety of funding sources.

Relevant Project Experience
Foothill Boulevard, CML – 5417(021), City of La Cañada Flintridge, CA. Federal Funding Administrator. This project constructed an approximately half-mile Class I bicycle and pedestrian path and two miles of Class II bike lane and bicycle amenities; raised medians; and a bus stop. Included cold milling existing pavement and repaving with Asphalt Rubber Hot Mix (ARHM); removal and installation of traffic striping and raised pavement marking; replacement of curb and gutter and other drainage improvements; traffic signal improvements to include new equipment, bicycle signal detection, and bicycle/pedestrian push buttons; street lighting; illuminated street name sign; and streetscape beautification with narrowed travel lanes to enhance bike and pedestrian mobility and safety.

Fair Oaks Traffic Signal, Fed No. HSIPL-5071 (020), City of South Pasadena, CA. Federal Funding Administrator. Willdan provided construction management and inspection service for the installation of fiber optic lines throughout Fair Oaks Avenue.

Arrow Highway Resurfacing Project, Fed No. HSIPL 5112 (019), City of Azusa, CA. Federal Funding Administrator. Willdan provided construction engineering services for the City of Azusa’s Arrow Highway Street Resurfacing and Highway Safety Improvement Project. The project included pavement rehabilitation on Arrow Highway, including cold milling, drainage improvements, PCC crosswalks, minor concrete repairs, landscaping, ARHM overlay, traffic detector loops, thermoplastic striping, and other appurtenant work. Willdan’s services included resident engineering, public works inspection, federal invoicing, labor compliance, and material testing services.

Pedestrian Crossings Project, Fed No. HSIPL 5164 (033), City of Inglewood, CA. Grant Funding Engineer responsible for all administrative filings and reporting to satisfy funding requirements for Caltrans reimbursement of HSIP funds. The City received a $250,000 HSIP Cycle 9 grant to upgrade five (5) uncontrolled crosswalks with enhanced crosswalk features.

Citywide Arterial Flashing Stop Signs and Advance Pavement Markings Project HSIP Cycle 10, City of Ridgecrest, CA. Grant Funding Engineer responsible for all administrative filings and reporting to satisfy funding requirements for Caltrans reimbursement of HSIP funds. A $491,100 HSIP Cycle 10 grant was awarded to upgrade existing stop signs with larger stop signs featuring solarEDUCATION BS, Civil Engineering | Civil
Engineer, California
No. 56397

REGISTRATION
Civil Engineer, California
No. 56397
32 YEARS OF EXPERIENCE
powered LED warning lights and new posts with wind bracing and installation of advance “STOP AHEAD” pavement markings at 25 locations.

Wilcox Avenue Complete Street and Safe Routes to School Project, Fed No.

ATPL 5369 (011), City of Cudahy, CA. Grant Funding Engineer responsible for all administrative filings and reporting to satisfy funding requirements for Caltrans reimbursement of ATP funds. The City received a $744,185 ATP grant to install crosswalks, pedestrian scale lighting, bulb outs with curb ramps, truncated domes, pedestrian countdown displays, signage, marking, striping, slurry seal, and realignment of crosswalks at 12 locations.

East and West Downs Street Widening Improvements, STPL 5385(057), City of Ridgecrest, CA. Federal Funding Administrator. The east side project was federally funded and the west side project was locally funded. The east side widening involved new curb, gutter, and sidewalk improvements. The west side widening project encompassed a new raised median, street lighting conduit, curb ramps, curb and gutter, sidewalks, driveway approaches, cement treatment, ARHM overlay, signing, striping and RRFB.

Cudahy Los Angeles River Area Improvement Project, CCL-5369(015), City of Cudahy, CA. Grant Funding Administrator. The City received $4,874,304 in state Clean California Grant funds to construct enhance the Los Angeles River bike path along Cudahy’s jurisdiction with gateway monuments, wayfinding signage, landscaping, architectural fencing, benches, and lighting. The project will also create a link between the Los Angeles River and the Cudahy River Park with pedestrian and cyclist amenities, clean and beautify the Clara Bridge slopes, and create a pocket park at the intersection of Otis Avenue and Elizabeth Street.

Rosecrans Avenue Bridge Project, BRLS 5336(018) and (019), City of Paramount, CA. Federal Funding Administrator. The City received Highway Bridge Program funding to rehabilitate or replace the Rosecrans Avenue bridge over the Los Angeles River.

Alondra at Passage Traffic Signal Project, HSIPSL 5336(023), City of Paramount, CA. State Funding Administrator. The City received $331,900 in HSIP Cycle 10 funds to install a traffic signal at the intersection of Alondra Boulevard and Passage Avenue.

Roadside Bridge Project, BHLO-5435(017), City of Agoura Hills, CA. Federal Funding Administrator. The City received $3,462,900 in Highway Bridge Program funding to rehabilitate the Roadside Bridge over Medea Creek.

Mines Avenue Regional Bikeway Project, ATPL 5351 (032), City of Pico Rivera, CA. Federal/State Funding Administrator. The City received $872,000 in federal ATP funds and $3.06 million in state ATP funds to install a Class IV bike lane, a Class I shared-use path, a Class II bicycle lane, medians with drought tolerant landscaping, sidewalks, curb ramps, signal modifications, and wayfinding signs.

David Knell, PE
Prior Rights Expertise
Mr. David Knell has more than 41 years of experience in the surveying and mapping field. He has been responsible for a variety of mapping and construction jobs as well as performing surveys and acting as an expert witness in legal cases.

His experience includes the supervision of field crews, overseeing office staff completing various survey projects, and extensive experience with local, state, and federal agencies. Mr. Knell has also done considerable work with title companies and attorneys for a variety of jobs. Mr. Knell has a wide range of experience preparing and checking subdivision maps. As a contract checker for the Cities of Agoura Hills, Dana Point, Lake Forest, Bell Gardens, Paramount, and Cerritos, and a surveyor in private practice, Mr. Knell has been involved in the preparation and checking of numerous Parcel Maps and Tract Maps, A.L.T.A Surveys, Records of Survey, Lot Line Adjustments, Parcel Map Waivers, Certificates of Compliance, and boundary determination. He also was responsible for preparing legal descriptions and sketches for a wide range of easements involving utilities, air space reservations, and construction projects. He has also worked with major utilities and title companies in determining easements and correcting defective legal descriptions.

Relevant Project Experience
Survey Map Checking, County of Marin, Surveyor, CA. Willdan has provided professional land surveying map checking services for Records of Survey for the County of Marin since April 2017 and will continue until at least February 2023 when our current contract expires. Our checking group, consisting of 3 Licensed Land Surveyors, reviews between 100 and 150 maps a year, depending on the number being submitted to the county. We have completely eliminated the backlog of 250 maps which existed when we first began working for the Marin County Department of Public Works in 2017. Currently, our turnaround time from 1st Submittal through 1st Check is less than the 90 days mandated by the Professional Land Surveyors’ Act.

City Surveyor Services and Various Survey Projects, City of La Cañada Flintridge, California. Surveyor. Willdan provides City Surveyor service (checking of all submitted maps and easements) as well as performing various topographic surveys for sidewalks which was part of a Safe Route to School Project. When the City embarked on its city-wide survey project, Willdan provided aerial survey and cross-sectional topography. We prepared 350 permanent and temporary easement documents (front sheet, legal description, and plat). Our survey crews constructed staked a major portion of the project. We worked closely with the City on its Town Center project, which entailed our review of the parcel map which included dedications and a large number of street vacations and public easements.

On-Call Surveying Services, Cities of Yorba Linda and La Mirada. As City Surveyor, Mr. Knell handles the interior check of all Tract Maps and Parcel Maps (the County checks the exterior boundary) and the review of Lot Line Adjustments,

EDUCATION
BS, Cartography, Boston
University, Boston
Civil Engineering and Land
Surveying Classes,
California State University,
Long Beach

REGISTRATIONS /

CERTIFICATIONS
Land Surveyor, California
No. 5301
41 YEARS OF EXPERIENCE
Parcel Map Waivers, Easements, and Certificates of Compliance. Willdan’s survey group has also prepared numerous easement quitclaim deeds for unwanted landscaping easements and vacation documents for streets being abandoned. We have performed topographic surveys and provided construction staking for several projects for the City as well as its Redevelopment Agency. We have assisted the City in dealing with several complex boundary and defective title issues.

General Engineering Services, City of Lakewood, CA. The Lakewood Boulevard Capacity Enhancement project limits extend from Del Amo Boulevard to Lakewood’s north city limits, approximately 1.5 miles. Lakewood Boulevard is a designated truck route that supports goods movements from the Ports of Long Beach and Los Angeles. The main objective of the project is to install a Class I bike path and sidewalk in the parkway area and to install minor roadway capacity enhancements on Lakewood Boulevard including dual left turn lanes at the intersection of Hardwick Street. Since the active transportation improvements will be constructed in the parkway, the existing roadway capacity will be maintained.

Other improvements include utility undergrounding, traffic signal improvements, LED street lighting, ADA enhancements, and green street improvements such as landscaped median islands, parkway trees, and stormwater retention. The estimated construction cost of this project is $38 million.

Malvern Avenue Rehabilitation Project, City of Fullerton, CA. Willdan provided design and construction support for the Malvern Avenue Rehabilitation project. The

1.75-mile project provides three travel lanes in each direction along the northerly section and two travel lanes along the easterly section. Improvements included asphalt, curb ramps, curb and gutter, sidewalks and catch basins. Bike lanes were also installed. Street rehabilitation strategies included coldmill with ARHM overlay and/or full-depth reconstruction. During the field review in preparation of the preliminary plan, Willdan identified sections to be reconstructed and noncompliant or missing ADA features; gutter replacements; and existing sidewalk, access ramp, and driveway issues. Prepared 65%, 95% and 100% plans, specifications and estimate and provided construction support.

Garfield Avenue Rehabilitation Project, City of Paramount, CA. Willdan provided design engineering services for street improvements through the Garfield Avenue corridor between the north and south city limits. The design involved street widening to accommodate a third lane in each direction; street resurfacing; two concrete intersections; concrete sidewalk curb and gutter and driveway approach reconstruction; catch basin construction; streetscape improvements for raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic signal modifications at nine locations along the Garfield Avenue corridor. Services included civil traffic and drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement management. Willdan prepared an initial study checklist and mitigated negative declaration pursuant to CEQA requirements.

REQUIRED FORMS AND STATEMENTS

14. EXCEPTIONS OR ADDITIONS
The Proposal shall include a detailed description of all exceptions to the provisions and conditions of this RFP upon which the Consultant’s submittal is contingent and which shall take precedence over this RFP.

Willdan has no exceptions or additions to the provisions and conditions of this RFP upon which our submittal is contingent and which shall take precedence over the City’s RFP. 13191 Crossroads Parkway North, Suite 405
Industry, CA 91746-3443
562.908.6200 | T 800.499.4484 | F 562.695.2120
www.willdan.com

EXHIBIT B

APPROVED FEE SCHEDULE
(SCHEDULE OF HOURLY LABOR RATES AND REIMBURSABLE)
Proposal for On-Call Engineering Services
H. Schedule of Hourly Rates
** For Non-Prevailing Wage Project *** For Prevailing Wage Project Mileage/Field Vehicle usage will be charged at the rate in accordance with the current FTR mileage reimbursement rate, subject to negotiation.

Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime will be charged at 1.5 times, and Sundays and holidays, 2.0 times the standard rates. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus fifteen percent (15%). A sub consultant management fee of fifteen percent (15%) will be added to the direct cost of all sub consultant services to provide for the cost of administration, consultation, and coordination. Valid March 2024 – March 2029, rates to be negotiated with City at three years. Thereafter, the rates may be raised once per year to the value between the 12-month % change of the Consumer Price Index for the Los Angeles/Orange County/Sacramento/San Francisco/San Jose area and five percent. For prevailing wage classifications, the increase will be per the prevailing wage increase set by the California Department of Industrial Relations. Rev V02 05.12.2023

WILLDAN ENGINEERING
Schedule of Hourly Rates
Effective March 2024

DESIGN ENGINEERING
Technical Aide I $77
Technical Aide II $100
Technical Aide III $120
CAD Operator I $126
CAD Operator II $146
CAD Operator III $162
GIS Analyst I $164
GIS Analyst II $180
GIS Analyst III $191
Environmental Analyst I $140
Environmental Analyst II $157
Environmental Analyst III $166
Environmental Specialist $180
Designer I $168
Designer II $174
Senior Designer I $184
Senior Designer II $193
Design Manager $191
Senior Design Manager $198
Project Manager I $177
Project Manager II $197
Project Manager III $207
Project Manager IV $223
Principal Project Manager $227
Program Manager I $197
Program Manager II $209
Program Manager III $228
Assistant Engineer I $145
Assistant Engineer II $162
Assistant Engineer III $170
Assistant Engineer IV $180
Associate Engineer I $189
Associate Engineer II $194
Associate Engineer III $196
Senior Engineer I $194
Senior Engineer II $198
Senior Engineer III $201
Senior Engineer IV $204
Supervising Engineer $209
Traffic Engineer I $209
Traffic Engineer II $223
City Engineer I $223
City Engineer II $227
Deputy Director $231
Director $237
Principal Engineer $257

BUILDING AND SAFETY
Assistant Code Enforcement Officer $103
Code Enforcement Officer $118
Senior Code Enforcement Officer $139
Supervisor Code Enforcement $168
Plans Examiner Aide $110
Plans Examiner $168
Senior Plans Examiner $184
Assistant Construction Permit Specialist $118
Construction Permit Specialist $124
Senior Construction Permit Specialist $146
Supervising Construction Permit
Specialist
$154
Assistant Building Inspector $139
Building Inspector $154
Senior Building Inspector $168
Supervising Building Inspector $184
Inspector of Record $196
Deputy Building Official $196
Building Official $198
Plan Check Engineer $192
Supervising Plan Check Engineer $194
Principal Project Manager $227
Deputy Director $231
Director $237

PLANNING
CDBG Technician $82
CDBG Specialists $98
CDBG Analyst $116
CDBG Coordinator $144
CDBG Manager $174
Housing Programs Coordinator $144
Planning Technician $123
Assistant Planner $154
Associate Planner $168
Senior Planner $191
Principal Planner $198
Planning Manager $211
Deputy Director $231
Director $237

ADMINISTRATIVE
Administrative Assistant I $95
Administrative Assistant II $114
Administrative Assistant III $133
Project Accountant I $107
Project Accountant II $125
Project Controller I $133
Project Controller II $150

CONSTRUCTION MANAGEMENT
Labor Compliance Specialist $139
Labor Compliance Manager $174
Utility Coordinator $167
Office Engineer I $140
Office Engineer II $159
Assistant Construction Manager $152
Construction Manager $176
Senior Construction Manager $191
Resident Engineer I $198
Resident Engineer II $206
Project Manager IV $223
Deputy Director $231
Director $237

INSPECTION SERVICES
Public Works Observer ** $125
Public Works Observer *** $151
Senior Public Works Observer** $136
Senior Public Works Observer *** $151

MAPPING AND EXPERT SERVICES
Survey Analyst I $143
Survey Analyst II $164
Senior Survey Analyst $187
Supervisor - Survey & Mapping $197
Principal Project Manager $227

LANDSCAPE ARCHITECTURE
Assistant Landscape Architect $146
Associate Landscape Architect $168
Senior Landscape Architect $184
Principal Landscape Architect $195
Principal Project Manager $227

EXHIBIT C

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute “public works” as defined in Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code (“Chapter 1”). Further, Consultant acknowledges that this Agreement is subject to (a) Chapter 1 and (b) the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. Therefore, as to those Services that are “public works”, Consultant shall comply with and be bound by all the terms, rules and regulations described in 1(a) and 1(b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725.5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subconsultant that is not registered with DIR pursuant to Section 1725.5. Consultant and subconsultants shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If the Consultant or any subconsultant ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771.4, Consultant’s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request. Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Consultant shall, as a penalty to City, forfeit $200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subconsultant.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subconsultant to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program. Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subconsultants shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. The Consultant shall not perform Work with any Subconsultant that has been debarred or suspended pursuant to California Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. The Consultant and Subconsultants shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777.1 or any other federal or state law providing for the debarment of consultants from public works. If the Consultant or any subconsultant becomes debarred or suspended during the duration of the project, the Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day’s work. Consultant shall comply with and be bound by Labor Code Section 1810.

Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Consultant shall, as a penalty to City, forfeit $25.00 for each worker employed in the performance of this Agreement by the Consultant or by any subconsultant for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one-half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”

12. For every subconsultant who will perform work on the project, Consultant shall be responsible for such subconsultant’s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each subconsultant a copy of those statutory provisions and a requirement that each subconsultant shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subconsultant’s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subconsultant and upon becoming aware of the failure of the subconsultant to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend (at Consultant’s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent consultants serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity (including Consultant, its subconsultants, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys’ fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement.

AGREEMENT NO. _______

PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF PICO RIVERA AND
D’LEON CONSULTING ENGINEERS

1. IDENTIFICATION
THIS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is entered into by and between the City of Pico Rivera, a California municipal corporation (“City”) and D’Leon Consulting Engineers, (“Consultant”). City and Consultant are sometimes hereinafter individually referred to as a “Party” and collectively referred to as “Parties.”

2. RECITALS

2.1 City has determined that it requires professional services from a consultant to provide on-call engineering services.

2.2 Consultant represents that it is fully qualified to perform such professional services by virtue of its experience and the training, education and expertise of its principals and employees. Consultant further represents that it is willing to accept responsibility for performing such services in accordance with the terms and conditions set forth in this Agreement.

NOW, THEREFORE, for and in consideration of the performance by the Parties of the mutual covenants and conditions herein contained, the Parties hereto agree as follows:

3. DEFINITIONS

3.1 “Scope of Services”: Such professional services as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “A” and incorporated herein by this reference.

3.2 “Approved Fee Schedule”: Such compensation rates as are set forth in the Consultant’s February 14, 2024 proposal to City attached hereto as Exhibit “B.”

3.3 “Commencement Date” : April 23, 2024

3.4 “Expiration Date” : June 30, 2029

4. TERM
The term of this Agreement shall commence at 12:00 a.m. on the Commencement Date and shall expire at 11:59 p.m. on the Expiration Date unless extended by written agreement of the Parties or terminated in accordance with Section 22 below.

Enclosure 3
13c
Professional Services Agreement
D’LEON CONSULTING ENGINEERS

Page 2 of 14 ends