Cities Index.
Agenda packet

Pico Rivera City Council
April 23, 2024

Document
Agenda packet
Meeting
April 23, 2024
Body
Pico Rivera City Council
Pages
38
Original file
263.9 MB
Text extracted from the city's file for reading and search. Open the original on picoriveraspeaks.org. That file is the official record.

*Commissioners receive a $30.00 stipend per each meeting held and attended. .

Tuesday, April 23, 2024
Regular Meeting 6:00 p.m.

Council Chamber
6615 Passons Boulevard
Next Resolution No. 7328
Next Ordinance No. 1184
Next Agreement No. 24-2317
Successor Agency to PRRA
Next Resolution No. SA-24-29
Next Ordinance No. SA-01
Next Agreement No. S24-006
Housing Assistance Agency
Next Resolution No. HA-108
Next Ordinance No. HA-16
Water Authority
Next Resolution No. 24-37
Next Ordinance No. 24-01
Next Agreement No. 24-78
Public Financing Authority
Next Resolution No. PFA-24-13
ROLL CALL:

Mayor/Chairman/President:

Andrew C. Lara
Mayor Pro Tempore/Vice Chairman/Vice President:

John R. Garcia
Councilmembers/Directors/Commissioners:

Gustavo V. Camacho
Erik Lutz
Dr. Monica Sanchez

TELECONFERENCE NOTICE
Pursuant to Government Code Section 54953, subdivision (b), the following Council meeting will include teleconference participation by Councilmember Dr. Monica Sanchez from:

Hyatt House Tempe/Phoenix/University
601 E 6th Street
Tempe, Arizona 85281
The Notice and Agenda will be posted at the teleconference location. Public comment from this address shall be allowed pursuant to Government Code Section 54954.3 COMMISSIONERS SCHEDULED TO BE PRESENT:

Maricela Lizarraga, Parks and Recreation Commission
Ana Rosa Ascencio, Sister City Commission
INVOCATION:

PLEDGE OF ALLEGIANCE:

PLEASE TURN OFF OR SILENCE CELL PHONES WHILE MEETING IS IN SESSION

AND PLEASE REFRAIN FROM TEXTING DURING THE MEETING
**************************************************************************************************** In compliance with the Americans with Disabilities Act of 1990, the City of Pico Rivera is committed to providing reasonable accommodations for a person with a disability. Please call the City Clerk’s office at (562) 801-4389, if special accommodations are necessary and/or if information is needed in an alternative format. Special requests must be made in a reasonable amount of time in order that accommodations can be arranged (within 24 to 48 hours’ notice).

Meeting jointly and regularly with the Pico Rivera Successor Agency to the Pico Rivera Redevelopment Agency (as needed); Pico Rivera *Housing Assistance Agency (as needed); Pico Rivera Water Authority (as needed); and Public Financing Authority (as needed) 4-23-2024 Agenda City Council

Page 2 of 9 ends

SPECIAL PRESENTATION(S):
• Proclamation – 55th Annual Municipal Clerk’s Week May 5-11, 2024 • Certificates of Recognition for the 2023-2024 El Rancho High School Varsity Cheer team
PUBLIC HEARING:

City Council:

1. Public Hearing – Vesting Tentative Tract Map No. 84271 – Request to Subdivide One Parcel for a 95-Unit Townhouse Condominium Development Located at 6540 Rosemead Boulevard. (1300)
a) Open public hearing
b) Memo from City Manager
c) Written Communications
d) Oral Communications
e) Close public hearing
f) Recommendation:

1. Approve a resolution authorizing a Vesting Tentative Tract Map No. 84271; and

2. Find that the Project categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15332 (Class 32 – Infill Development).

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF PICO RIVERA, CALIFORNIA, APPROVING VESTING
TENTATIVE TRACT MAP NO. 84271 FOR A 95-UNIT

TOWNHOUSE CONDOMINIUM DEVELOPMENT LOCATED AT
6540 ROSEMEAD BOULEVARD (APN 6378-017-004)

2. Public Hearing – Fiscal Year 2024-2025 Community Development Block Grant Annual Action Plan Approval. (1600)
a) Open public hearing
b) Memo from City Manager
c) Written Communications
d) Oral Communications
e) Close public hearing
f) Recommendation:

1. Approve a resolution authorizing the City Manager, or designee, to submit the fiscal year 2024-2025 Annual Action Plan to the U.S.

Department of Housing and Urban Development; and

2. Authorize the City Manager to enter into agreements with eligible subrecipients and purchase of supplies, programs, and equipment as noted in the fiscal year 2024-2025 Annual Action Plan and budget. 4-23-2024 Agenda City Council

Page 3 of 9 ends

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PICO RIVERA, CALIFORNIA, APPROVING THE FISCAL YEAR 2024-2025 ANNUAL ACTION PLAN IN ACCORDANCE WITH THE U.S.

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

REGULATIONS
PUBLIC COMMENTS:

IF YOU WOULD LIKE TO COMMENT ON ANY LISTED AGENDA ITEMS OR NONAGENDA ITEMS, PLEASE FILL OUT A GREEN PUBLIC COMMENT REQUEST FORM

AND PROVIDE IT TO THE STAFF MEMBER AT THE BACK TABLE BEFORE THE MEETING STARTS.

When you are called to speak, please come forward and state your name and city of residency for the record. You have three (3) minutes to make your remarks. In accordance with Government Code Section 54954.2, members of the City Council may only: 1) respond briefly to statements made or questions posed by the public; 2) ask a question for clarification; 3) provide a reference to staff or other resources for factual information; 4) request staff to report to the City Council at a subsequent meeting concerning any matter raised by the public; and 5) direct staff to place a matter of business on a future agenda.

City Council members cannot comment on items that are not listed on a posted agenda.

CONSENT CALENDAR ITEMS:

All items listed on the Consent Calendar may be acted on by a single motion without separate discussion. Any motion relating to a Resolution or Ordinance shall also waive the reading of the titles in full and include its adoption as appropriate. If discussion or separate vote on any item is desired by a Councilmember or staff, that item may be pulled from the Consent Calendar for separate consideration.

CONSENT CALENDAR:

City Council:

3. Minutes:
• City Council regular meeting April 9, 2024
Recommendation: Approve

4. 15th Warrant Register for the 2023-2024 Fiscal Year. (700) Check Numbers: 294283-294386
Special Check Numbers: None
Recommendation: Approve

5. Authorizing Application Submittal for the Local Government Waste Tire Cleanup Grant from the California Department of Resources Recycling and Recovery. (700)
Recommendation:

1. Approve a resolution authorizing the submission of applications for funding under the California Department of Resources Recycling and Recovery Local Government Waste Tire Cleanup Grant; and 4-23-2024 Agenda City Council

Page 4 of 9 ends

2. Authorize the City Manager or his designee to execute all programrelated documents, including future grant applications and administer funding if the City’s application is awarded.

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PICO RIVERA, CALIFORNIA, AUTHORIZING SUBMISSION

OF GRANT APPLICATIONS AND RELATED AUTHORIZATIONS FOR

THE WASTE TIRE CLEANUP GRANT PROGRAM ADMINISTERED BY

CALRECYCLE

6. Establishing Job Classification for the Full-Time Senior Water Treatment Supervisor and Reclassify the Current Water Treatment Supervisor to Senior Water Treatment Supervisor. (200)
Recommendation:

1. Approve a resolution establishing job classification for the Senior Water Treatment Supervisor; and

2. Approve the reclassification of a Public Works employee from their current position as the Water Treatment Supervisor to the Senior Water Treatment Supervisor.

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PICO RIVERA, CALIFORNIA, ESTABLISHING JOB

CLASSIFICATION FOR THE FULL-TIME SENIOR WATER

TREATMENT SUPERVISOR AND RECLASSIFY A PUBLIC WORKS

EMPLOYEE FROM WATER TREATMENT SUPERVISOR TO SENIOR

WATER TREATMENT SUPERVISOR

7. Approval of Final Tract Map No. 83619 – 45-Unit Townhome Home Development Located at 4820 Durfee Avenue. (1300)
Recommendation:

1. Approve a resolution for Final Tract Map No. 83619 – 45-unit townhome development located at 4820 Durfee Avenue;

2. Approve Final Tract Map No. 83619 as it conforms to the requirements in the Subdivision Map Act and previously approved Vesting Tentative Tract Map No. 83619;

3. Accept dedication of an easement for public street and utility purposes;

4. Authorize the Public Works Director/City Engineer to sign the Final Parcel Map; and

5. Authorize the City Clerk to sign and submit the Final Tract Map No. 83619 for recordation with the Los Angeles County Registrar-Recorder’s Office.

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PICO RIVERA, CALIFORNIA, APPROVING THE FINAL
TRACT MAP NO. 83619 TO ALLOW FOR CONSTRUCTION OF
FORTY-FIVE (45) TOWNHOMES LOCATED AT 4820 DURFEE AVE
4-23-2024 Agenda City Council

Page 5 of 9 ends

8. Approve a Resolution Declaring Designated Fleet Inventory and Equipment as Surplus Personal Property. (200)
Recommendation:

1. Approve a resolution declaring the vehicles and equipment included in Exhibit A to the resolution as surplus personal property and direct the City Manager, or his designee, to proceed with the disposal of such vehicles and equipment, and approving of the sale of any such vehicles or equipment over $5,000 to the highest bidder; and

2. Authorize the City Manager, or his designee, to execute any agreements necessary to facilitate the sale or disposal of vehicles and equipment listed on Exhibit A of the resolution.

Resolution No._____ A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF PICO RIVERA, CALIFORNIA, DECLARING DESIGNATED

FLEET INVENTORY AND EQUIPMENT AS SURPLUS PERSONAL

PROPERTY AND AUTHORIZING THE CITY MANAGER TO PROCEED

WITH THE DISPOSAL OR SALE OF THE VEHICLES AND EQUIPMENT

9. Approve Amendment No. 1 to Agreement No. 21-2049, for On-Call Information Technology Management Services. (500)
Recommendation:

1. Approve Amendment No. 1 to Agreement No. 21-2049 with Infinity Technologies for On-Call Information Technology Management Services, to increase compensation by an additional $100,000 per fiscal year for a total amount not-to-exceed $300,000, for augmentation of Information Technology services; and

2. Authorize the City Manger to execute the amendment in a form approved by the City Attorney.

Agreement No.21-2049-1

10. Pavement Management Program Update (Non-CIP No. 30057) – Award of Professional Services Agreement. (500)
Recommendation:

1. Award a Professional Services Agreement to Infrastructure Management Services, LLC (IMS), to prepare and update the Pavement Management Program Update (Non-CIP No. 30057) for an amount not-to-exceed $67,459 and authorize the City Manager to execute an agreement in a form approved by the City Attorney; and

2. Authorize the City Manager or his designee to process change orders, as needed, in an amount not-to-exceed a $6,750 contingency (approximately 10% of the total contract amount) for unforeseen field conditions during data collection
Agreement No.________

11. Award a Professional Services Agreement to Diego’s Auto Repair for Vehicle and Equipment Maintenance Repair Services. (500)
Recommendation:
4-23-2024 Agenda City Council

Page 6 of 9 ends

1. Award a Professional Services Agreement to Diego’s Auto Repair, Inc. to provide vehicle and equipment maintenance services for City-owned vehicles and equipment for a term of three (3) years with two (2), one-year options to extend, for the annual amount of $75,000, and a not-to-exceed amount of $225,000 for the three-year term of the Agreement; and

2. Authorize the City Manager to execute the Agreement, in a form approved by the City Attorney, including any amendments to exercise the two (2) oneyear extension options at a not-to-exceed annual amount of $75,000.

Agreement No.________

12. Approve Amendment No. 4 to Agreement No. 18-1825 with Mariposa Landscapes Inc. for Landscape Maintenance Services. (500) Recommendation:

1. Approve an Amendment No. 4 to Agreement No. 18-1825 with Mariposa Landscapes, Inc. pursuant to the exemptions provided in section 3.20.030 of the Pico Rivera Municipal Code, for an annual amount of $348,240 and a not-to-exceed amount of $696,500 ($29,020 per month for a term of two (2) years);

2. Authorize the City Manager or designee to process change orders in an amount not-to-exceed 10% of the total amendment, as needed, up to $69,650 for contingency purposes;

3. Find the approval of Amendment No. 4 to Agreement No. 18-1825, to be pursuant to Pico Rivera Municipal Code Section 3.20.030 (B), in order to modify agreement compensation, scope of work, and extend the term for Landscape Maintenance Services with Mariposa Landscapes, Inc.; and

4. Authorize the City Manager to execute the amendment in a form approved by the City Attorney.

Agreement No.18-1825-4

13. On-Call Engineering Services – Award of Professional Services Agreement.

Recommendation: (500)

1. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to HDR Engineering, Inc. to provide on-call engineering services;

2. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Willdan Engineering. to provide on-call engineering services;

3. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to D’Leon Consulting Engineers to provide on-call engineering services;

4. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to IMEG to provide on-call engineering services;

5. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to JMDiaz, Inc. to provide on-call engineering services;
4-23-2024 Agenda City Council

Page 7 of 9 ends

6. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Cordoba Corporation to provide on-call engineering services;

7. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Kimley Horn & Associates, Inc. to provide on-call engineering services;

8. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Southstar Engineering and Consulting, Inc. to provide on-call engineering services;

9. Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Mark Thomas & Company, Inc. to provide on-call engineering services;

10.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to NV5, Inc. to provide on-call engineering services;

11.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to NCM Engineering Corp. to provide oncall engineering services;

12.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to AKM Consulting Engineers to provide on-call engineering services;

13.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Onward Engineering to provide on-call engineering services;

14.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Alta Planning & Design, Inc. to provide on-call engineering services;

15.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to BKF Engineers to provide on-call engineering services;

16.Award a Professional Services Agreement for a term of five (5) years in the total amount of up to $2,500,000 to Yao Engineering Inc. to provide on-call engineering services; and

17.Authorize the City Manager to execute the agreements in a form approved by the City Attorney.

14. Landscape Maintenance Services – Reject All Bids. (500) Recommendation:

1. Reject all bids for the landscape maintenance services.

15. Request for Approval of the 2024 Fireworks Stand Permits. (200) Recommendation:

1. Approve the attached list of fireworks stand applications and authorize the issuance of permits to operate.

16. Equipment Purchase for the Public Works Department. (700) Recommendation:
4-23-2024 Agenda City Council

Page 8 of 9 ends

1. Authorize the purchase of a Utility Cab Tractor in the amount of $51,400 from Kubota Tractor Corporation by way of Sourcewell Contract No. 031121-KBA for tractors, spreaders, lawn equipment, and related services;

2. Authorize the purchase of two (2) John Deere Gators and three (3) SmithCo Sand Star Groomers (field-rakes) in the aggregate amount of $172,800 from Deere & Company by way of Sourcewell Contract No. 031121-DAC for grounds maintenance equipment; and

3. Authorize the City Manager to execute all documents related to the purchase of the recommended vehicles.

17. Third Quarter Treasurer’s Report and the Monthly Investment Transaction Report as of March 31, 2024 – Fiscal Year 2023-2024. (700) Recommendation:

1. Receive and file the Treasurer’s Report for the quarter ending March 31, 2024, which represents balances and activities for the third quarter (January through March) of the 2023-24 fiscal year; and

2. Receive and file the Treasurer’s Monthly Investment Transaction Report as of March 31, 2024.

CONSENT CALENDAR ITEMS PULLED FOR FURTHER DISCUSSION
REGULAR AGENDA:

18. Adoption of the Historic Whittier Boulevard Multimodal Revitalization Plan.

Recommendation: (100)

1. Approve the Historic Whittier Boulevard Multimodal Revitalization Plan which will serve as the formal transportation and circulation element of the Historic Whittier Boulevard Specific Plan.

CITY MANAGER/STAFF REPORTS
GOOD OF THE ORDER (INTERGOVERNMENTAL AGENCY MEETINGS, AB 1234

REPORTS, NEW BUSINESS, OLD BUSINESS)
CLOSED SESSION:
a. CONFERENCE WITH LABOR NEGOTIATOR
Pursuant to Government Code Section 54957.6
Agency Designated Representative: City Manager Carmona, Human Resources Director Shirinian and Assistant City Manager Garcia
Employee Organizations: Service Employees International Union Local 721 FullTime, Part-Time and Directors Units, and Confidential Employees Association ADJOURNMENT:
4-23-2024 Agenda City Council

Page 9 of 9 ends

AFFIDAVIT OF POSTING
I, Cynthia Ayala, City Clerk, for the City of Pico Rivera, DO HEREBY CERTIFY, under penalty of perjury under the laws of the State of California, that the foregoing notice was posted at the Pico Rivera City Hall bulletin board, Pico Rivera website www.pico-rivera.org, Pico Rivera Post Office and Parks: Smith, Pico and Rivera which are available for the public to view on this 18th, day of April 2024.

Dated this 18th, day of April 2024.

Cynthia Ayala, CMC
City Clerk
SB343 NOTICE
In compliance with and pursuant to the provisions of SB343 any public writing distributed by the City Clerk to at least a majority of the City Council Members regarding any item on this regular meeting agenda will be available on the City’s website.

STATEMENT REGARDING DECORUM AT CITY COUNCIL MEETINGS
If you wish to speak at the time set aside for public comments, the City Council has established the following standards and Rules of Decorum as allowed by State law. • Public comment is limited to those portions of the meeting referred to as Public Comments. These portions are intended for members of the public to address the City Council, Successor Agency, Housing Assistance Agency or Water Authority on matters related to agendas or any other items under the subject matter jurisdiction of the City Council or Agencies. Please fill out the desired color-coded card prior to the start of the meeting at 6:00 p.m. Once the meeting has begun, no further cards will be accepted. • A yellow Public Hearing Comment Request card must be completed to speak during a Public Hearing.
• A green Public Comment Request – Card is for those wishing to address the Council/Agency on agenda items or any other items under the subject jurisdiction of the City Council/Agency.
• Citizens may address the Council, Successor Agency or Housing Assistance Agency once for a maximum of three minutes. After each speaker returns to his/her seat, the Mayor shall determine the time and manner of response, but typically if answers are available, they will be given after all speakers have had an opportunity to address the City Council.
• Members of the audience are asked to refrain from clapping or otherwise speaking from their seats. Those not meeting the standards for decorum may be escorted from the meeting.

RULES OF DECORUM CAN BE FOUND IN THE PICO RIVERA MUNICIPAL CODE SECTION

2.08.050 AS ESTABLISHED BY ORDINANCE 783 ADOPTED ON AUGUST 20, 1990 AND AMENDED BY ORDINANCES 822 (SEPTEMBER 21, 1992) AND 1020 (MARCH 21, 2006).

To: Mayor and City Council
From: City Manager
Meeting Date: April 23, 2024
Subject: PUBLIC HEARING – VESTING TENTATIVE TRACT MAP
NO. 84271 – REQUEST TO SUBDIVIDE ONE PARCEL FOR
A 95-UNIT TOWNHOUSE CONDOMINIUM DEVELOPMENT
LOCATED AT 6540 ROSEMEAD BOULEVARD
Recommendation:

1. Approve a resolution authorizing a Vesting Tentative Tract Map No. 84271; and

2. Find that the Project categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15332 (Class 32 – Infill Development).

Fiscal Impact:

There is no impact to the General Fund.

Background:

On November 21, 2023, the Community and Economic Development Department received an application from Chris Courtney on behalf of Brandywine Homes, for real property located at 6540 Rosemead Boulevard requesting approval of Conditional Use Permit No. 758 and Vesting Tentative Tract Map No. 84271.

On March 25, 2024, the Division of Land Committee, that includes the Directors of Public Works, Parks and Recreation and Community and Economic Development, met, reviewed the subdivision application, and voted unanimously in favor of both applications and recommended approval to the Planning Commission.

On April 15, 2024, the Planning Commission held a public hearing, took public testimony, and voted unanimously in favor of recommendation to approve the Vesting Tentative Tract Map No. 84271 to the City Council.
1 CITY COUNCIL AGENDA REPORT - MEETING OF APRIL 23, 2024 PUBLIC HEARING – VESTING TENTATIVE TRACT MAP NO. 84271 – REQUEST TO SUBDIVIDE ONE PARCEL FOR A 95-UNIT TOWNHOUSE CONDOMINIUM DEVELOPMENT LOCATED AT 6540 ROSEMEAD BOULEVARD

Page 2 of 4 ends

Discussion:

The applicant requests approval of Vesting Tentative Tract Map No. 84271 to subdivide the subject property (APN 6378-017-004) for condominium purposes. It is currently one parcel and will be subdivided by way of a condominium map that shows the layout, location, boundaries, dimensions, and numbers of condominium units and common areas. Whenever a provision of Title 17 (Subdivisions) requires that a tentative map be filed, a vesting tentative map may instead be filed. The vesting tentative map shall be filed and processed in the same manner as a tentative.

The project includes the demolition and removal of the Knights Inn Hotel and associated parking lot currently on the subject property. The development will consist of a gated community of 95 townhouse units within 15, three-story structures, guest parking and common open space. The 4.04-acre project with 95 units results in a project density of

23.5 dwelling units per acre.

Vehicular access will be taken from Rosemead Boulevard frontage road via a two-way driveway of 48 feet in length. Pedestrian access will be taken from a gated entrance adjacent to the driveway.

Pico Rivera Municipal Code Chapter 18.44.040 requires two (2) spaces within a garage for each dwelling unit and one (1) open guest parking space for each eight (8) dwelling units or fraction thereof. The proposed townhouse development requires 190 spaces within a garage (2 spaces X 95 units = 190 spaces). The proposed development requires 12 guest parking spaces (95 units /8 = 12 spaces). The applicant proposes 190 spaces within a two-car garage per unit and 24 guest parking spaces: 22 regular and 2 ADA compliant parking spaces.

Surrounding Properties
The subject property is in the General Commercial (C-G) zone and is designated Mixed Use (M-U) under the Land Use Element of the General Plan. The subject property is located north of Washington Boulevard, South of Balfour Street, West of Bequette Avenue and East of Rosemead Boulevard. Land uses surrounding the proposed project are commercial and residential.
[This space internationally left blank]
CITY COUNCIL AGENDA REPORT - MEETING OF APRIL 23, 2024
PUBLIC HEARING – VESTING TENTATIVE TRACT MAP NO. 84271 – REQUEST TO SUBDIVIDE ONE PARCEL FOR A 95-UNIT TOWNHOUSE CONDOMINIUM DEVELOPMENT LOCATED AT 6540 ROSEMEAD BOULEVARD

Page 3 of 4 ends

General Plan Zone Existing Uses
North Mixed Use (M-U)
Housing Element Site
General-Commercial (C-G)
Mixed Use Overlay (M-U) Offices
South Mixed Use (M-U)
Low-Density Residential
General-Commercial (C-G)
Mixed Use Overlay (M-U)
Single-Family Residential (S-F)
Pico Water District
Well/ Residential
East Low-Density Residential Single-Family Residential (S-F) Residential West Mixed Use (M-U)
Housing Element Site
Professional and Administrative
(P-A) Residential
Regional Housing Needs Assessment
For the 2021-2029 Housing Element planning period, Southern California Association of Governments (SCAG) assigned the City with a requirement of 1,024 dwelling units. The table below demonstrates the City’s Regional Housing Needs Assessment (RHNA) allocation and is divided into various income levels, based on a percentage of the Area Median Income (AMI).

Upon completion, the 430 units in the Above Moderate category will be lowered by 95 units or an equivalent 22% reduction of the required number of units.

Housing Needs for 2021-2029
Income Category (% of County AMI) Number of Units Percent Extremely Low (30% or less) 1501
Very Low (31 to 50%) 299 29.1%
Low (51 to 80%) 146 14.3%
Moderate (81% to 120%) 149 14.6%
Above Moderate (Over 120%) 430 42.0%
Total 1,024 100.0%
Note 1. Extremely low units are included within the 299 very low units shown in this table.

General Plan:

The proposed project is consistent with the City of Pico Rivera General Plan for the following reasons:
• The site is identified as a Housing Element site and opportunity area within the adopted Fifth Cycle Housing Element.
• Goal 3.7 of the General Plan, which states: Protect and enhance existing residential neighborhoods, assuring that they are safe, attractive, provide quality housing choices and are designed and maintained to enhance livability.

CITY COUNCIL AGENDA REPORT - MEETING OF APRIL 23, 2024
PUBLIC HEARING – VESTING TENTATIVE TRACT MAP NO. 84271 – REQUEST TO SUBDIVIDE ONE PARCEL FOR A 95-UNIT TOWNHOUSE CONDOMINIUM DEVELOPMENT LOCATED AT 6540 ROSEMEAD BOULEVARD

Page 4 of 4 ends

• Policy 3.7.2, states Neighborhood Revitalization. Promote revitalization of neighborhoods in need by maintaining public improvements, encouraging infill development compatible with the scale and character of existing development, and supporting public and private efforts to upgrade and maintain neighborhood appearance and the existing housing stock.

Environmental Analysis:

The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15332, Class 32 – Infill Development Projects. Class 32 consists of projects characterized as in-fill development meeting the conditions as enumerated below:
a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.
b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c) The project site has no value as habitat for endangered, rare or threatened species.
d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
e) The site can be adequately served by all required utilities and public services.

Conclusion:

Staff recommends that the City Council approve the enclosed resolution authorizing Vesting Tentative Tract Map No. 84271.

Steve Carmona
SC:AB:AG:jj
Enclosures: 1) Resolution – Vesting Tentative Tract Map No. 84271 2) Vesting Tentative Tract Map
3) Notice of Exemption
4) Public Hearing Notice
RESOLUTION NO. ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PICO

RIVERA, CALIFORNIA, APPROVING VESTING TENTATIVE TRACT
MAP NO. 84271 FOR A 95-UNIT TOWNHOUSE CONDOMINIUM
DEVELOPMENT LOCATED AT 6540 ROSEMEAD BOULEVARD (APN
6378-017-004)
WHEREAS, on November 21, 2023, the Community and Economic Development Department received an application from Chris Courtney on behalf of Brandywine Homes Residential, for real property located at 6540 Rosemead Boulevard requesting approval of Vesting Tentative Tract Map No. 84271 to develop a new 95-unit townhouse residential development; and
WHEREAS, on March 4, 2024, staff held an open house to discuss the proposed project at Smith Park community room from 5:00 – 7:00 p.m. The project applicant provided enlarged architectural plans and discussed the project at length with those in attendance. A flyer was mailed to owners and occupants within a 1,000’ radius of the subject property notifying them of the open house; and
WHEREAS, on March 25, 2024, the Division of Land Committee, that includes the Directors of Public Works, Parks and Recreation and Community and Economic Development, met, reviewed the subdivision application, and voted unanimously in favor of the application and recommended approval to the Planning Commission; and WHEREAS, on April 15, 2024, the Planning Commission held a public hearing, took public testimony, voted unanimously in favor of a recommendation of approval of Vesting Tentative Tract Map No. 84271 to the City Council; and WHEREAS, studies and investigations were made and a staff report with recommendations was submitted, and the City Council, upon giving the required notice, did on the 23rd of April 2024, conduct a duly noticed public hearing as required by law to consider said Vesting Tentative Tract Map application. Notice of the hearing was originally posted and mailed to property owners and properties within a 1,000- foot radius of the project site by April 12, 2024, and published in the Cerritos Community Newspaper on April 12, 2024.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pico Rivera as follows:

SECTION 1. The City Council finds that the foregoing recitals are true and correct and are incorporated herein by reference.

SECTION 2. This Resolution with reports, findings and recommendations herein contained shall constitute a report to the City Council.

Enclosure 1
1a
RESOLUTION NO. ____

Page 2 of 7 ends

SECTION 3. Pursuant to Pico Rivera Municipal Code Section 17.16.040, and based upon all testimony and comments from the general public, the examination and review of the investigations by staff included in the staff report contained herein, the report of the Division of Land Committee, the report and recommendation of the Planning Commission, and all other pertinent and relevant fact pertaining hereto, the City Council finds as follows:
1) That the proposed map is consistent with the applicable goals and objectives set forth in the Pico Rivera General Plan. The General Plan identifies the proposed project site as a Housing Element Opportunity Site. Specifically, the project will support Goal 3.7 of the General Plan, which states: “Protect and enhance existing residential neighborhoods, assuring that they are safe, attractive, provide quality housing choices and are designed and maintained to enhance livability.” The project site is in close proximity to a mix of residential and commercial uses, thus creating the demand for this project and is conveniently located for residents in the area. Due to the proposed development’s consistency with several General Plan policies, the City’s desire to facilitate a diverse supply of new residential construction to accommodate the City’s anticipated growth, the City finds the proposal is consistent with the policies and guidance provided within the General Plan. The proposal is consistent with the direction provided within the General Plan.
2) That the subdivision is in compliance with the development standards and regulations contained in Titles 17 and 18 (Subdivision & Zoning respectively) of the Pico Rivera Municipal Code (PRMC) relevant to the development of multi-family housing on General Commercial (C-G) zoned properties.
3) That the subject property is suitable for development of this type as the site contains approximately 4.04 acres of land area and provides access to publicly dedicated streets.
4) That the site is physically suitable for the proposed density of the development. The residential development will not exceed the maximum density allowed in the Mixed Use (M-U) General Plan land use designation, which allows for up to 30 dwelling units per acre. The proposed development is for 95 airspace condominiums, which has the density of approximately 23.5 dwelling units per acre. 5) That the subdivision will not result in conditions or circumstances contrary to the public health, safety, or welfare.
6) That pursuant to the provisions of the State of California Public Resources Code and State Guidelines for the California Environmental Quality Act (CEQA), the project qualifies for a Class 32 Categorical Exemption (In-Fill Development Projects) in accordance with the requirements of Section 15332 of the State CEQA Guidelines, a Notice of Exemption (Class 32-Infill) was prepared concerning the 95-airspace condominium.

RESOLUTION NO. ____

Page 3 of 7 ends

7) That the design of the subdivision or type of improvements is not likely to cause serious public health problems. The proposed subdivision has been reviewed under the guidelines of the CEQA and City guidelines which determined that the project would result in no adverse impacts or cause serious public health problems. 8) That the design of the subdivision or type of improvements will not conflict with easements acquired by the public at large for access through or use of the property within the proposed subdivision. The subdivision includes the appropriate dedication of easements and access agreements to ensure that the subdivision and public at large have access throughout the property for emergency purposes. 9) That the proposed project will not be detrimental to adjoining properties as the project site is located at the eastern side of Rosemead Boulevard. Ingress and egress to the project site will be provided off Rosemead Boulevard Frontage Road. The proposed development is conditioned to provide adequate landscaping in compliance with State Law, consisting of trees, shrubs, and groundcover throughout the project site and a 6’-0” high block wall along the perimeters of the project site. In addition shrubs along the eastern perimeter wall, creating a visual buffer to protect adjacent existing residences located to the east and south. Development of the project site for high density residential purposes, in the form of multiple-family airspace condominiums, is considered compatible with the surrounding area. In addition, each single-family home will have a 2-car garage, 24 on-site guest parking spaces. These improvements will enhance the appearance and functionality of the site while protecting adjacent properties.
10)That the traffic generating capacity and operation of the proposed multiple-family condominiums will not place a burden or demand upon other municipal improvements, services, or utilities as each multiple-family home will have direct access through Rosemead Boulevard Frontage Road. In addition, two-car garages for each unit will be provided along with twenty-four guest parking spaces. 11)That adequate consideration for the protection of the environment has been satisfactorily demonstrated as no significant impact is anticipated with the inclusion of best management practices (BMP’s) and with the inclusion of conditions of approval that require the development to comply with the most current California Building Code, submit a grading and drainage plan, and implement of dust and noise control measures.
12)That adequate consideration has been given to assure the conservation and stabilization of property values, the direction of development and land use planning of the area in which the use is proposed to be located and the peculiar suitability of such zone as the proposed development is maintained and consistent with the community’s overall planning goals and programs through the conditions of approval.

SECTION 4. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section RESOLUTION NO. ____

Page 4 of 7 ends

15332, Class 32 – InFill Development Projects. Class 32 consists of projects characterized as in-fill development meeting the conditions enumerated below:
a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.
b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c) The project site has no value as habitat for endangered, rare or threatened species.
d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
e) The site can be adequately served by all required utilities and public services. f) None of the exceptions to the application of categorical exemptions under CEQA Guidelines Section 15300.2 apply.

The project meets all the foregoing criteria. A Notice of Exemption shall be filed with the County Clerk of the County of Los Angeles and Office of Planning and Research pursuant to the California Environmental Quality Act.

SECTION 5. Vesting Tentative Tract Map No. 84271 complies with Chapter 17.18 Vesting Tentative Tract Map of the Pico Rivera Municipal Code.

SECTION 6. The City Council of the City of Pico Rivera has reviewed Vesting Tentative Tract Map No. 84271 and related environmental aspects of this subdivision as required by law subject to the Conditions of Approval contained in Exhibit "A”; and SECTION 7. In the event that any portion of this Resolution is deemed invalid or is unenforceable, such provision shall be severable from the remainder and that the remainder of the Resolution shall be given full force and effect.

SECTION 8. The City Clerk shall certify to the adoption of this Resolution and hereafter the same shall be in full force and effect.
[Signatures on the following page]
RESOLUTION NO. ____

Page 5 of 7 ends

APPROVED AND PASSED this 23rd day of April, 2024,
_________________________________
Andrew C. Lara, Mayor
ATTEST: APPROVED AS TO FORM:
_____________________________ __________________________________ Cynthia Ayala, CMC, City Clerk Arnold M. Alvarez-Glasman, City Attorney AYES:

NOES:

RESOLUTION NO. ____

Page 6 of 7 ends

EXHIBIT “A”

CONDITIONS OF APPROVAL
TENTATIVE PARCEL MAP N0. 84271

1. The applicant shall comply with the City of Pico Rivera Building Division requirements identified as Attachment “A”, dated December 21, 2023.

2. The applicant shall comply with the City of Pico Rivera Public Works Department requirements identified as Attachment “B”, dated January 25, 2024.

3. The applicant shall comply with the County of Los Angeles Fire Department requirements identified as Attachment “C”, dated March 13, 2024.

4. The applicant shall comply with the County Sanitation District of Los Angeles County requirements identified as Attachment “D”, dated December 21, 2023.

5. The applicant shall comply with the Pico Water District requirements identified as Attachment “E,” dated January 8, 2024.

6. The property shall be subdivided in accordance with the Vesting Tentative Tract Map No. 84271 date stamped April 11, 2024, labeled Attachment “F”,

7. The applicant shall comply with the requirements of Southern California Edison.

8. The applicant shall provide a mylar copy of the recorded Tract Map to the Pico Rivera Public Works Department and the Planning Division prior to issuance of a building permit for the development.

9. The applicant shall provide sidewalks throughout the subdivision development, unless waived by the Pico Rivera City Council.

10. All deficient and damaged curb and gutter damaged during the project construction shall be reconstructed to the satisfaction of the City Engineer. along the entire frontage of public streets to match existing.

11.The applicant shall identify that all streets within the subdivision are public right-ofways.

12.The applicant to provide easements as necessary for utility placement on private property.

13.Applicant to submit full set of plans to the Pico Rivera Building Division for plan check review and obtain all required permits.

14.All structures, signage, pavement, etc. shall be demolished prior to any construction of a new development.

RESOLUTION NO. ____

Page 7 of 7 ends

15.Final Tract Map shall reflect all subsequent applicable changes that may result from approval of Tentative Tract Map and Conditional Use Permit.

16.The applicant shall in-lieu of dedicating park land pay park fees equal to the value of the land prescribed for dedication. The amount of the fee shall be based upon the average fair market value for the City per Section 17.36.150 of the Pico Rivera Municipal Code. The applicant shall pay the park fees prior to issuance of the building permit.

17.Final Tract Map to be prepared in accordance with subdivision requirements of the Pico Rivera Municipal Code, the State Subdivision Map Act and applicable conditions contained herein.

18.Proof of recordation of the Final Map shall be submitted to the Community and Economic Development Department.

19.Applicant shall pay all fees associated with the Final Map plan check review.

20. Approval of Tentative Tract Map No. 84271 is subject to the concurrent approval of Conditional Use Permit No. 758.

21.The applicant shall commence construction within 24 months of the effective date of this grant, or this approval shall become null and void. The effective date is to be considered the date of recordation of Final Tract Map No. 84271.

22.Applicant shall comply with all conditions stipulated under Conditional Use Permit No. 758

23.Failure to comply with all conditions of approval set forth herein may result in revocation of the Conditional Use Permit in accordance with Section 18.56.110 and Section 18.60.070 of the Zoning Ordinance.

Attachment A

DEPARTMENT OF PUBLIC WORKS

INTEROFFICE MEMORANDUM
DATE: April 16, 2024
TO: Planning Division, Community and Economic Development FROM: Engineering Division, Public Works
SUBJECT: (PRELIMINARY) CONDITIONS OF APPROVAL FOR PROPOSED DEVELOPMENT AT 6540 ROSEMEAD BOULEVARD –
CONDITIONAL USE PERMIT NO. 758 AND VESTING
TENTATIVE TRACT MAP NO. 84271
The Public Works Department has reviewed the proposed development and provides the following (preliminary) conditions of approval pertaining to the subject project:

STREET IMPROVEMENTS

1. Street Improvement Plans shall be prepared by a Registered Civil Engineer showing all existing and proposed public improvements to the satisfaction of the Public Works Department.

2. All deficient existing public improvements within the frontage of the project shall be upgraded to current City Standards and to the satisfaction of the City Engineer.

3. Existing curb, gutter and sidewalk damaged by the project construction shall be reconstructed as required by the City Engineer.

4. Asphalt paving that is damaged by the project construction shall be reconstructed as required by the City Engineer.

5. Close existing driveways on Rosemead Boulevard service road, which will no longer be utilized as part of the new development, with curb and gutter and full-width sidewalk to match existing.

6. Construct new driveways at least 3 feet away from any above-ground obstructions in the public right-of-way to the top of the driveway “X.” Otherwise, the obstruction shall be relocated at the developer’s expense. Ensure that each driveway provides proper pedestrian access across the driveway in compliance with the Americans with Disabilities Act (ADA). The final layout and site driveway design shall be subject to the review and approval of the City Engineer.

7. No parking will be allowed on Rosemead Boulevard service road. The entire length Attachment B
of the curb on Rosemead Boulevard service road shall be painted red.

8. Where utility cuts on concrete pavement are proposed, the entire concrete panel shall be removed and reconstructed.

9. Cape seal the full-width of Rosemead Boulevard service road along the frontage of the project per the recommendation of the latest street pavement study. Restore pavement markings as necessary. Repair any visible utility-cut pavement failures.

10. All on-site parking and circulation areas shall be paved as required by a geotechnical report prepared by a Registered Civil Engineer, subject to the review and approval of the Public Works and Community Development Departments.

11. Centerline ties and benchmark monuments shall be preserved. In the event that ties and benchmark monuments are disturbed, a licensed Land Surveyor shall be secured for their re-establishment. All documentation shall be submitted to the City for record keeping.

12. Preserve survey monuments (property corners, centerline ties, etc) in the public right-of-way. All disturbed and removed survey monuments in the public right-of-way shall be re-established and a record of survey shall be filed with the County Surveyor in accordance with applicable provisions of the state law.

13. All public works improvements shall be constructed in accordance with the latest edition of the APWA Standard Specifications for Public Works Construction (“Green Book”) and Pico Rivera City Standards, and to the satisfaction of the Director of Public Works/City Engineer prior to the issuance of a Certificate of Occupancy.

RIGHT-OF-WAY DEDICATION AND EASEMENTS

14. This project requires the dedication of the necessary street right-of-way for Rosemead Boulevard service road and public sidewalk purposes across the project frontage.

15. Easement(s) shall be dedicated to the City of Pico Rivera for all parts of public sewer and water systems not located within the public right-of-way.

TRAFFIC SAFETY

16. A transportation impact study shall be prepared by a Registered Traffic Engineer and submitted to the Engineering Division for review and approval. The study shall be prepared using the City of Pico Rivera Vehicle Miles Traveled Transportation Study Guidelines and focus on access locations, inbound/outbound turning movements, internal circulation, and parking operations, to determine the need for additional striping, pavement markings, and signage that will improve motor vehicle and pedestrian safety.

17. The developer shall be responsible for installing or repairing all centerline striping, traffic legends, raised reflective pavement markers and other traffic delineation required by the City Engineer, including signal loops damaged or required to be installed as part of the project.

18. A Signage and Striping Plan shall be prepared by a Registered Traffic Engineer and submitted to the Public Works Department for review and approval.

19. Clear unobstructed sight distances shall be provided at all site driveways.

20. The developer shall install street name signs, stop signs, and all other miscellaneous signage related to project development as required by the City Engineer.

GRADING AND DRAINAGE

21. Grading and drainage plans shall be prepared by a Registered Civil Engineer to the satisfaction of the Public Works Department and Building Division. Show all existing and proposed driveways, curb & gutter, sidewalks, handicap ramps, street trees, tree wells, street lights, street signs, power poles, fire hydrants, bus stop furnishings, utility boxes, meters, traffic signal poles and cabinets, parkway drains, etc. on the plans.

22. A Low Impact Development (LID) Plan Determination Form must be completed and if determined, the project must incorporate one or more LID system(s) in the project design. Submittal of an LID plan is required, and the system(s) proposed must be shown on the grading and drainage plans. The Los Angeles County Low Impact Development Manual may be used as reference on potential LID systems.

23. Where redevelopment results in alteration to more than fifty percent of impervious surfaces of a previously existing development, and the existing development was not subject to post-construction stormwater quality control requirements, the entire project must be mitigated.

24. A catch basin shall be installed at the rear of the property to capture all surface water not captured by implemented LID system(s). The catch basin shall be connected to the existing storm drain system on Homebrook Street. The existing outlets draining to Homebrook Street shall be closed off.

25. Comply with all Federal, State, and local agency requirements pertaining to the Clean Water Act, which establishes regulations, set forth in the Countywide National Pollutant Discharge Elimination System (NPDES) Permit.

26. Comply with the City’s Storm Water Management Ordinance and SUSMP requirements. Implement all NPDES requirements and Best Management Practices during and after construction. Provide and obtain approval of a site-specific Erosion Control Plan and/or Storm Water Pollution Prevention Plan (SWPPP) from the City’s plan-check consultants.

27. All catch basins and on-site storm drain inlet facilities shall be stenciled with the appropriate “No Dumping” message.

28. Dust control operations shall be performed by the developer at the time, location, and in the amount required and as often as necessary to prevent the excavation or fill work, demolition operation, or other activities from producing dust in amounts harmful to people or causing a nuisance to persons living nearby or occupying buildings in the vicinity of the work. The developer is responsible for compliance with Fugitive Dust Regulations issued by the Air Quality Management District (AQMD).

29. Control of dust shall be by sprinkling of water, use of approved dust preventatives, modifications of operations, or any other means acceptable to the City Engineer, City of Pico Rivera, the Regional Water Quality Control Board (RWQCB), the AQMD, and any Health or Environmental Control Agency having jurisdiction over the area. The City Engineer shall have the authority to suspend all construction operations if, in his opinion, the developer fails to adequately provide for dust control.

UTILITIES

30. Developer is responsible for research on private utility lines (Gas, Edison, Telephone, Cable, Irrigation, etc.) to ensure there are no conflicts with the site.

31. All utility companies (for non-City owned utilities) shall be contacted to establish appropriate easements to provide services to each unit.

32. All existing on-site utility lines and existing utility lines serving the proposed development, that conflict with this project, shall be relocated, removed, or sealed at the developer’s expense to the satisfaction of the City Engineer.

33. Remove any encroachments or interfering facilities from the public right-of-way as directed by the City Engineer.

34. The subject property shall be served by underground utilities (SCE, Telephone, and Cable TV).

35. All overhead utility services within the perimeter of the project shall be placed underground.

36. Relocation of any public water or sewer lines shall be subject to approval by the City Engineer.

37. All proposed on-site sewer, water, and drainage facilities shall be private system(s) maintained by the property owner unless otherwise approved by the City as public system(s).

SEWER

38. Sewer Improvement Plans shall be prepared by a Registered Civil Engineer showing all existing and proposed sewer improvements to the satisfaction of the Public Works Department.

39. The developer shall consult the City Engineer to determine the sewer location and design requirements.

40. Should any modification of public sewer mains be required, developer shall prepare sewer plans per Los Angeles County Public Works Consolidated Sewer Maintenance Division template.

41. Install adequate sewer lateral(s) as necessary to serve the proposed development and abandon any existing sewer laterals that will not be used, to the satisfaction of the Building Division.

42. Conduct a sewer capacity study and provide a copy to the Engineering Division subject to City Engineer’s approval. In the event that proposed sewer discharge from the development exceeds the existing sewer system capacity, developer shall upgrade existing sewer system. The limits of the upgrade shall be to the downstream point of connection to where sufficient capacity exists.

43. Developer shall secure sewer system connection permit from the Los Angeles County Sanitation District at 1955 Workman Mill Road, Whittier, CA, Telephone No. (562) 698-7411 or (562) 685-5217.

44. Easements may be required and shall be subject to review by the City Engineer to determine the final locations and requirements.

WATER

45. Water Improvement Plans shall be prepared by a Registered Civil Engineer showing all existing and proposed public works improvements to the satisfaction of the Public Works Department.

46. The water supply system serving the development shall be adequately sized to accommodate the total required domestic and fire flows, as required by the Pico Rivera Water Authority (PRWA) and Los Angeles County Fire Department.

Coordinate with the PRWA to remove all existing water meters that will not be used by the development.

47. Conduct a water system capacity study and provide a copy of the report to the Engineering Division for review and approval. The water supply system serving the proposed development shall be adequately sized to accommodate the total required domestic and fire flows, as required by the PRWA. Coordinate with the PRWA regarding removal of all existing water meters that will not be used by the development. The water mains shall be of sufficient size to accommodate the total domestic and fire flows required for the subdivision. The domestic flows required are to be determined by the PRWA and City Engineer. Fire flows required are to be determined by the Los Angeles County Fire Department. Developer shall obtain Los Angeles County Fire Department’s approval of fire flow adequacy prior to issuance of building permits.

48. Developer shall be responsible to meet all water requirements and guidelines of the PRWA, the Los Angeles County Health Department, and Los Angeles County Fire Department.

49. The provision of fire protection water systems, hydrants, and appropriate easements shall be in conformance with the Los Angeles County Fire Department.

50. All water facilities shall be installed outside any driveways and drive approaches and shall be in accordance with PRWA standards.

51. Prior to the filing of the final map, there shall also be filed with the City Engineer, a statement from the water purveyor indicating subdivider compliance with the fire flow requirements of the Los Angeles County Fire Department.

TRACT MAP

52. Details shown on the tentative tract map are not necessarily approved. Any details that are not consistent with the City’s ordinances, general conditions of approval, or City Engineer's policies must be specifically approved during the final map or improvement plan review.

53. A final tract map prepared by, or under the direction of a Registered Civil Engineer authorized to practice land surveying, or a Licensed Land Surveyor, must be processed through the City Engineer's office prior to being filed with the County Recorder.

54. A preliminary subdivision guarantee is required showing all fee interest holders and encumbrances. An updated title report shall be provided before the final tract map is released for filing with the County Recorder.

55. Monumentation of the tract map boundaries, street centerline and lot boundaries is required for a map based on a field survey.

56. Comply with all requirements of the Subdivision Map Act.

GENERAL

57. Developer shall deposit $25,000 with the City to cover the City’s costs incurred in reviewing the project plans, including the costs of traffic, civil, planning and environmental consultants.

58. Pay permit and inspection fees associated with this project in accordance with the latest fee schedule at the time of permit issuance and inspection.

59. Comply with the City’s Community Development Ordinance pertaining to construction debris recycling. Contact the Building Division to obtain a Construction & Demolition Debris Waste Reduction Recycling Plan form(s).

60. Developer shall coordinate with NASA Services at (888) 888-0388 to provide proper construction waste disposal container(s), including facilities for recycling.

61. Developer must comply with all applicable South Coast Air Quality Management District (AQMD) regulations.

62. Final conditions and comments cannot be determined until all plans are submitted that are sufficiently complete.

COUNTY OF LOS ANGELES FIRE DEPARTMENT

FIRE PREVENTION DIVISION
Land Development Unit
5823 Rickenbacker Road
Commerce, CA 90040
Telephone (323) 890-4293, Fax (323) 890-9783
EPIC-LA NUMBER: FLDU2023006269 PROJECT NUMBER: TR84271
CITY/COMMUNITY: STATUS: Cleared
PROJECT ADDRESS: 6540 Rosemead Boulevard
Pico Rivera, CA 90660
DATE: 03/13/2024

CONDITIONS
Tentative Tract Map 84271 has satisfied the County of Los Angeles Fire Department Fire Prevention Division Land Development Unit review.

1. Install 1 new public fire hydrant.

PUBLIC FIRE HYDRANT FIRE FLOW REQUIREMENTS: REQUIRED FIRE FLOW 2,000 GPM @ 20 PSI FOR 2 HOURS
See Tentative Map Grading Plan Mark Up or Site Plan Mark Up for plotted fire hydrant location.

All hydrants shall measure 6”x 4"x 2-1/2" brass or bronze, conforming to current AWWA standard C503 or approved equal.

Vehicular access must be provided and maintained serviceable throughout construction to all required fire hydrants. All required fire hydrants shall be installed, tested, and accepted prior to construction.

Water Systems improvement plans for the required public fire hydrant shall be submitted through epicla.lacounty.gov from the local water purveyor and reference FLDU2023006269.

Verification of financial obligation for the installation of the required public fire hydrant shall be submitted to the County of Los Angeles Fire Department through epicla.lacounty.gov prior to Final Map clearance for recordation.

2. Install 3 private on site fire hydrants.

REQUIRED FIRE FLOW FOT THE REQURIED PRIVATE ON-SITE FIRE HYDRANTS; REQUIRED FIRE FLOW 2,500 GPM @ 20 PSI FOR 2 HOURS.

Underground piping plans for the required private on-site fire hydrants shall be submitted to the County of Los Angeles Fire Department Fire Prevention Division Engineering Section Sprinkler Plan Check Unit for review and approval prior to installation. You may reach them at (323)890-4125 for specific submittal requirements.

3. A digital copy of the Final Map shall be submitted to the Fire Department's Land Development Unit for review and approval prior to recordation. Submittal shall be provided through EPIC-LA using the following Plan Type:

Fire Land Development–City Request–Final Map (Tract/Parcel).

4. For any questions regarding the report, please contact Nancy Rodeheffer at (323) 890-4243 or [email protected].

Reviewed by: Page 1 of 1
Attachment C
DOC 7107728.D02 A Century of Service
December 21, 2023
Ref. DOC 7107720
VIA EMAIL [email protected]
Ms. Aneli Gonzalez
Assistant Planner
City of Pico Rivera
Community and Economic Development Department
6615 Passons Boulevard
Pico Rivera, CA 90660
Dear Ms. Gonzalez:

Comment Letter for Conditional Use Permit No. 758 and Vesting Tentative Tract Map No. 84271 The Los Angeles County Sanitation Districts (Districts) received the email and plans for the subject project, located in the City of Pico Rivera, forwarded by your office on December 18, 2023. The proposed project is located within the jurisdictional boundary of District No. 2. We offer the following comments regarding sewerage service:

1. The wastewater flow originating from the proposed project will discharge to a local sewer line, which is not maintained by the Districts, for conveyance to the Districts’ Downey-Bellflower Trunk Sewer, located in Passons Boulevard at Washington Boulevard. The Districts’ 18-inch diameter trunk sewer has a capacity of 2.1 million gallons per day (mgd) and conveyed a peak flow of 1.6 mgd when last measured in 2016.

2. The wastewater generated by the proposed project will be treated at the A.K. Warren Water Resource Facility located in the City of Carson, which has a capacity of 400 mgd and currently processes an average flow of 237 mgd, or the Los Coyotes Water Reclamation Plant located in the City of Cerritos, which has a capacity of 37.5 mgd and currently processes an average flow of 19.9 mgd.

3. The expected increase in average wastewater flow from the project, described in the plan as 95 attached townhomes and a 1,260 square-foot recreation building, is 6,183 gallons per day, after all structures on the project site are demolished. For a copy of the Districts’ average wastewater generation factors, go to www.lacsd.org, under Services, then Wastewater Program and Permits and select Will Serve Program, and click on the Table 1, Loadings for Each Class of Land Use link.

4. The Districts are empowered by the California Health and Safety Code to charge a fee to connect facilities (directly or indirectly) to the Districts’ Sewerage System or to increase the strength or quantity of wastewater discharged from connected facilities. This connection fee is used by the Districts for its capital facilities. Payment of a connection fee may be required before this project is permitted to discharge to the Districts’ Sewerage System. For more information and a copy of the Connection Fee Information Sheet, go to www.lacsd.org, under Services, then Wastewater (Sewage) and select Rates & Fees. In determining the impact to the Sewerage System and applicable connection fees, the Districts will determine the user category (e.g. Condominium, Single Family Home, etc.) that best represents the actual or anticipated use of the parcel(s) or facilities on the parcel(s) in the development. For more specific information regarding the Attachment D
Ms. Aneli Gonzalez 2 December 21, 2023
DOC 7107728.D02 A Century of Service
connection fee application procedure and fees, please contact the Districts’ Wastewater Fee Public Counter at (562) 908-4288, extension 2727.

5. In order for the Districts to conform to the requirements of the Federal Clean Air Act (CAA), the capacities of the Districts’ wastewater treatment facilities are based on the regional growth forecast adopted by the Southern California Association of Governments (SCAG). Specific policies included in the development of the SCAG regional growth forecast are incorporated into clean air plans, which are prepared by the South Coast and Antelope Valley Air Quality Management Districts in order to improve air quality in the South Coast and Mojave Desert Air Basins as mandated by the CAA. All expansions of Districts’ facilities must be sized and service phased in a manner that will be consistent with the SCAG regional growth forecast for the counties of Los Angeles, Orange, San Bernardino, Riverside, Ventura, and Imperial. The available capacity of the Districts’ treatment facilities will, therefore, be limited to levels associated with the approved growth identified by SCAG. As such, this letter does not constitute a guarantee of wastewater service, but is to advise the applicant that the Districts intend to provide this service up to the levels that are legally permitted and to inform the applicant of the currently existing capacity and any proposed expansion of the Districts’ facilities.

If you have any questions, please contact the undersigned at (562) 908-4288, extension 2708 or at [email protected].

Very truly yours,
Shirly Wang
Customer Service Specialist
Facilities Planning Department
SW:sw
cc: A. Schmidt
A. Howard
Attachment E

℄ ℄ ℄℄ Attachment F
0 1" = 30'
15 30 60
VAN
0 1" = 30'
15 30 60
VAN
0 1" = 30'
15 30 60
VAN

FIRE LANE

FIRE LANE

VIOLATING VEHICLES WILL BE CITED OR TOWED
AT OWNER'S EXPENSE CVC 22658A CVC 22500.1 POLICE OR SHERIFF'S

PHONE NUMBER
0 1" = 30'
15 30 60

5. ℄ ℄ ℄℄ Enclosure 2
1b
0 1" = 30'
15 30 60
VAN
0 1" = 30'
15 30 60
VAN
0 1" = 30'
15 30 60
VAN

FIRE LANE

FIRE LANE

VIOLATING VEHICLES WILL BE CITED OR TOWED
AT OWNER'S EXPENSE CVC 22658A CVC 22500.1 POLICE OR SHERIFF'S

PHONE NUMBER
0 1" = 30'
15 30 60

5. CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA ● CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 1

CATEGORICAL EXEMPTION
AND

ENVIRONMENTAL ASSESSMENT

ROSEMEAD TOWNHOMES
6540 ROSEMEAD BOULEVARD
PICO RIVERA, CALIFORNIA 90660
LEAD AGENCY:

CITY OF PICO RIVERA

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
6615 PASSONS BOULEVARD
PICO RIVERA, CALIFORNIA 90660
REPORT PREPARED BY:

BLODGETT BAYLOSIS ENVIRONMENTAL PLANNING
2211 S. HACIENDA BOULEVARD, SUITE 107
HACIENDA HEIGHTS, CALIFORNIA 91745
APRIL 11, 2024
PICO 049
Enclosure 3
1c

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA ● CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 2
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA ● CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 3

TABLE OF CONTENTS

1.0 INTRODUCTION .............................................................................................................. 7

2.0 PROJECT LOCATION ....................................................................................................... 7

3.0 ENVIRONMENTAL SETTING ........................................................................................... 8 Exhibit 1 Regional Map ................................................................................................................................. 9 Exhibit 2 Citywide Map ................................................................................................................................ 10 Exhibit 3 Local Map ...................................................................................................................................... 11 Exhibit 4 Aerial Photograph ........................................................................................................................ 12 Exhibit 5 On-Site Photographs .................................................................................................................... 13

4.0 PROJECT DESCRIPTION ............................................................................................... 14 Exhibit 6 Site Plan ......................................................................................................................................... 17 Exhibit 7 Building Elevations ....................................................................................................................... 18 Exhibit 8 Building Elevations ...................................................................................................................... 19 Exhibit 9 Building Elevations ..................................................................................................................... 20 Exhibit 10 Building Elevations ..................................................................................................................... 21 Exhibit 11 Building Elevations .................................................................................................................... 22

5.0 CATEGORICAL EXEMPTION FINDINGS ....................................................................... 23 FINDING 5.1. - LAND USE COMPATIBILITY (CEQA SECTION 15332 (A) ...............................................................24 FINDING 5.2 - PROJECT SITE SIZE (CEQA SECTION 15332 (B) ........................................................................... 25 FINDING 5.3 - HABITAT VALUE (CEQA SECTION 15332 (C) ................................................................................ 25 FINDING 5.4 - SIGNIFICANT EFFECTS (TRAFFIC, NOISE, AIR, PUBLIC SERVICES AND UTILITIES) (CEQA SECTION 15332 (D) .......................................................................................................................................................... 26 FINDING 5.5 - SIGNIFICANT EFFECTS ON UTILITIES AND PUBLIC SERVICES (CEQA SECTION 15332 (E) .............. 35 FINDING 5.6.1. - DISLOCATION ........................................................................................................................... 39 FINDING 5.6.2. - SENSITIVE ENVIRONMENTAL RESOURCES ................................................................................ 39 FINDING 5.6.3. - SCENIC NATURAL VIEWS ......................................................................................................... 40 FINDING 5.6.4. - CORTESE LISTING ................................................................................................................... 40 FINDING 5.6.5. - HISTORIC RESOURCES ............................................................................................................ 40 FINDING 5.6.6. - STATE TRUSTEE OR RESPONSIBLE AGENCY APPROVAL ............................................................. 41

APPENDICES (UNDER A SEPARATE COVER)
Appendix A – Air Quality Report
Appendix B – Noise Measurements
Appendix C – Traffic Impact Study
Appendix D – Phase I and II Environmental Site Assessment

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA ● CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 4
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 5

CATEGORICAL EXEMPTION
TO: Los Angeles County Registrar Recorder FROM: City of Pico Rivera Los Angeles County Clerk, Main Office Community and Economic Development Department. 12400 Imperial Highway 6615 Passons Boulevard
Norwalk, California 90650 Pico Rivera, California 90660 NAME: Rosemead Townhomes.

ADDRESS: 6540 Rosemead Boulevard, Pico Rivera, California, 90660.

CITY/COUNTY: City of Pico Rivera, Los Angeles County.

APPLICANT: Chris Courtney, Brandywine Homes, 16580 Aston Road, Irvine, California 92606.

PROJECT: The City of Pico Rivera, in its capacity as a Lead Agency, is reviewing an application that would include a Conditional Use Permit and Vesting Tentative Tract Map that would include the construction of 95 townhome units within a 4.04-acre site located at 6540 Rosemead Boulevard. The site is currently occupied by a two level motel (the Knights Inn Hotel) consisting of 100 guest rooms and other amenities. The existing onsite improvements would be demolished to accommodate the proposed new residential development. The new residential development would consist of 16 new buildings including 7, five-plex buildings (each building would contain 5 residential units); 3, six-plex buildings (each building would contain 6 units; 3, eight-plex buildings (each building would contain 8 units; 2, nineplex buildings (each building would contain 9 units); and an amenity building. The 15 residential buildings would contain 3 levels and the amenity building would consist of a single level. The 95- residential units would consist of four floor plans (referred to as Plan 1, Plan 2, Plan 3, and Plan 4).

Plans 1 and 2 would consist of 2 bedrooms and 2 ½ baths, Plan 3 would consist of 3 bedrooms and 3 ½ baths, and Plan 4 would consist of 4 bedrooms and 3 ½ baths. The proposed project would provide a total of 202 parking spaces including 190 enclosed garage spaces for residents and 24 parking spaces for guests. Common open space would total 25,047 square feet. Vehicular access would be provided by a gated driveway with the west side of Rosemead Boulevard. The internal drive aisles are 26-feet in width and consists of two travel lanes. The project site’s zoning designation is General Commercial (GC).

EXEMPTION: The project qualifies as exempt pursuant to CEQA Guidelines Section 15332 (Class 32 Infill Development Exemption).

STATUS: __ Ministerial (Section 21080 (b)(1); (Section No. ______); __ Declared Emergency (Section 21080 (b)(3); (Section No. ______); __ Emergency Project (Section 21080 (b)(4); (Section No. ______); __ Statutory Exemption (Section No. ______);
√ Categorical Exemption Section No. 15332, Infill Exemption). __ The activity is not subject to CEQA (Section No. ______); __ Other.

CITY CONTACT Aneli Gonzalez, Assistant Planner
City of Pico Rivera Community and Economic Development Department 6615 Passons Boulevard
Pico Rivera, California. 90660
Signature Date:

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 6
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 7

1.0 INTRODUCTION
The City of Pico Rivera, in its capacity as a Lead Agency, is reviewing an application of a Conditional Use Permit and Vesting Tentative Tract Map that would involve the construction of 95 townhome units within the 4.04-acre site located at 6540 Rosemead Boulevard. The site is currently occupied by a two level motel (the Knights Inn Hotel) consisting of 100 guest rooms, a restaurant, and other amenities. The existing onsite improvements would be demolished to accommodate the proposed new townhome development. The new residential development would consist of 16 new buildings including 7, five-plex buildings (each building would contain 5 units); 3, six-plex buildings (each building would contain 6 units; 3, eight-plex buildings (each building would contain 8 units; 2, nine-plex buildings (each building would contain 9 units); and an amenity building. The 15 residential buildings would contain 3 levels and the amenity building would consist of a single level. The 95-residential units would consist of four floor plans (referred to as Plan 1, Plan 2, Plan 3, and Plan 4). Plans 1 and 2 would consist of 2 bedrooms and 2 ½ baths, Plan 3 would consist of 3 bedrooms and 3 ½ baths, and Plan 4 would consist of 4 bedrooms and 3 ½ baths. The proposed project would provide a total of 202 parking spaces including 190 enclosed garage spaces for residents and 24 parking spaces for guests. Common open space would total 25,047 square feet. Vehicular access would be provide by a gated driveway access with the east side of Rosemead Boulevard. The internal drive aisles would be 26-feet in width and consists of two travel lanes. The project site’s zoning designation is General Commercial (G-C). The project site’s address is 6540 Rosemead Boulevard, in the City of Pico Rivera.1 Pursuant to the California Environmental Quality Act (CEQA) Guidelines, a Notice of Exemption (NOE) may be filed if the City of Pico Rivera, in its capacity as the Lead Agency for the proposed project, determines that a proposed action or project is exempt from CEQA. According to the CEQA Guidelines, a NOE must contain the following information:
● A description of the proposed action or project;
● A finding that the proposed action or project is exempt, including a citation of the State CEQA Guidelines section or statute under which the project is found to be exempt; and, ● A brief statement in support of the finding.2
The analyses of potential impacts that support the Categorical Exemption’s (CE’s) findings are provided herein in Section 5.0, Findings Supporting the Applicable CEQA Exemption. This CE and the supporting environmental analysis represent the City’s independent judgment and the position of the City of Pico Rivera, in its capacity as the Lead Agency. The project Applicant is Chris Courtney, Brandywine Homes, 16580 Aston Road, Irvine, California 92606.

2.0 PROJECT LOCATION
The project site is located within the central portion of the City of Pico Rivera. Pico Rivera is located in southeastern Los Angeles County, approximately 10 miles southeast of downtown Los Angeles. Pico Rivera is bounded by the City of Downey on the south, the City of Montebello on the west, the Whittier Narrows Regional Park on the north, and the City of Whittier and the City of Santa Fe Springs on the east.3 Major physiographic features in the surrounding area include the Rio Hondo River located approximately 4,000 1 Danielian Associates Architects and Planners. Brandywine Homes. 6540 Rosemead Boulevard] Architectural Site Plan. January 1, 2023.
2 CEQA Guidelines California Code of Regulations, Title 14, Division 6, Chapter 3, Article 19. Categorical Exemptions. (Section 15332). 3 United States Geological Survey. Whittier 7½ Minute Quadrangle. Photo revised 1994.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 8
feet to the west, the San Gabriel River located approximately 1.06 miles to the east, the Montebello Hills located approximately 2.6 miles to the northwest, and the Puente Hills located approximately 4.5 miles to the northeast.4 The location of the City of Pico Rivera in a regional context, is shown in Exhibit 1. A citywide map is provided in Exhibit 2 indicating the site’s location in the City.

The project site is located on the east side of Rosemead Boulevard. The site’s address is 6540 Rosemead Boulevard. The Assessor’s Parcel Number (APN) that is applicable to the project site is 6378-017-004. The project site is located approximately 1.17 miles south of Whittier Boulevard and 1,455 feet north of Washington Boulevard. The project site’s latitude and longitude are 33°98'58.29"N; -118°09'40.81"N. A local map is provided in Exhibit 3. An aerial photograph of the project site is shown in Exhibit 4.

3.0 ENVIRONMENTAL SETTING
The project site is located on a developed property that is currently designated as General Commercial (GC) which permits Multiple Family Residential developments under the City of Pico Rivera Zoning Ordinance.

The site is currently occupied by a two level motel (the Knights Inn Hotel) that consists of 100 guest rooms and other amenities. Within the paved portions of the project site, surface water is collected in stormwater drains and culverts, and is diverted to the sanitary sewer. On the unpaved portions of the project site, surface runoff infiltrates (percolates)into the ground surface. Approximately 90% of the site is covered over in impervious surfaces (buildings and parking areas). An aerial photograph of the project site is provided in Exhibit 4. Photographs of the project site are provided in Exhibit 5. The surrounding land uses include the following:5
● North of the Site: A two level office building is located to the north of the site (6500 Rosemead Boulevard). This existing building is occupied by the United Auto Workers (UAW) Region 6. This area is zoned as General Commercial (C-G).
6 ● South of the Site: A water well (Well No. 11) operated by Pico Water District, is located to the south of the site. A liquor store (6616 Rosemead Boulevard) is located on the northwest corner of Rosemead Boulevard and Carron Drive. Single-family homes are located further east, on the north site of Carron Drive. These homes have frontage along the north side of Carron Drive. This area is zoned as SingleFamily Residential (S-F) and General Commercial (C-G). ● West of the Site: The Rosemead Boulevard right-of-way (ROW) extends along the project site’s west side. Various office uses and the Pico Rivera Gardens housing complex are located further west, along the west side of Rosemead Boulevard. This area is zoned as Professional Administrative (P-A). 7 ● East of the Site: Single-family homes are located to the east of the site. These homes have frontage on Bequette Avenue. This area is zoned as Single-Family Residential (S-F).8 4 Google Maps and City of Pico Rivera Zoning Map. Website accessed on March 11, 2024. 5 Ibid.
6 Ibid.
7 Ibid.
8 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 9
EXHIBIT 1 REGIONAL MAP
Source: Blodgett Baylosis Environmental Planning

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 10
EXHIBIT 2 CITYWIDE MAP
Source: Blodgett Baylosis Environmental Planning

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 11
EXHIBIT 3 LOCAL MAP
Source: Blodgett Baylosis Environmental Planning

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 12
EXHIBIT 4 AERIAL PHOTOGRAPH
Source: Google Maps

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 13
EXHIBIT 5 ON-SITE PHOTOGRAPHS
Source: Blodgett Baylosis Environmental Planning

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 14
The environmental setting of the project site and the surrounding area are summarized are summarized in Table 1.

Table 1 Environmental Setting
Location Existing Use Zoning Designation
Project Site Motel (Knights Inn Motel) General Commercial (G-C) North of the Site Office Building (UAW Region 6). General Commercial (G-C) South of the Site Market and Water Well No. 6.

Single family homes (4 units).

General Commercial (G-C) and
Single Family Residential (S-F)
West of the Site Rosemead Blvd.

Offices and Pico Rivera Gardens housing complex Professional Administrative (P-A) East of the Site Single-family homes (10 units). Single Family Residential (S-F) Source: Blodgett Baylosis Environmental Planning

4.0 PROJECT DESCRIPTION
The site is currently occupied by a two level motel (Knights Inn Hotel) consisting of 100 guest rooms, a restaurant, and other amenities. The existing on-site improvements would be demolished to accommodate the proposed new townhome development. The proposed project would then involve the site’s development with 95-townhomes.9 The key project elements are summarized below:
● Site Plan. The proposed project would involve the construction of 95 townhome units within the

4.04-acre site located at 6540 Rosemead Boulevard. The new 95 townhome units would be located within 15 new, three level buildings. A single one-level building would be a clubhouse. The proposed project’s development density would be 23.5 units per acre. The proposed project’s lot coverage is 44%. The total floor area of the new buildings would be 227,861 square feet. The development’s floor area ratio (FAR) is 1.32.10
● New Buildings. The new residential development would consist of 16 new buildings including 7, fiveplex buildings (each building would contain 5 units); 3, six-plex buildings (each building would contain 6 units; 3, eight-plex buildings (each building would contain 8 units; 2, nine-plex buildings (each building would contain 9 units); and an amenity building. The 15 residential buildings would contain 3 levels and the amenity building would consist of a single level. The maximum height of the three story townhome units would be 37 feet, 3-inches.11 Each townhome unit would be provided a two-car enclosed garage. The characteristics are summarized in Table 2. 9 Danielian Associates Architects and Planners. Brandywine Homes. 6540 Rosemead Boulevard] Architectural Site Plan. January 1, 2023.
10 Ibid.
11 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 15
Table 2 Description of New Buildings
Building Type Description Buildings
5 Plex Building 5 units/building 4,5,7,10,11,14,15
6-Plex Building 6 units /building 2,3,8
8-Plex Building 8 units/building 6,12,13
9-plex Building 9 units/building 1,9
Amenity Building One level clubhouse --
Source: Danielian Associates Architects
● Housing Units. The 95-residential units would consist of four floor plans (referred to as Plan 1, Plan 2, Plan 3, and Plan 4). Plans 1 and 2 would consist of 2 bedrooms and 2 ½ baths, Plan 3 would consist of 3 bedrooms and 3 ½ baths, and Plan 4 would consist of 4 bedrooms and 3 ½ baths. The floor area of the proposed units would range from 1,396 square feet to 2,038 square feet. As indicated in Table 3, 43 units would consist of 2-bedrooms, 2 ½ bathrooms, 30 units would consist of 3 bedrooms, 3 ½ bathrooms, and 22 units would consist of 4 bedrooms and 3 ½ bathrooms. Each unit would have 150 square feet of ground level open space yard area and 100 square feet of open space on the upper level decks. Each townhome unit would be provided with a two-car enclosed garage. Table 3 summarizes the housing unit types.12
Table 3 Description of Unit Types
Unit Plan Unit Type Floor Area # Units
Plan 1 (Tandem Garage) 2 bd., 2 ½ bath 1,396 sq. ft. 13 units Plan 2 (Tandem Garage) 2 bd., 2 ½ bath 1,366 sq. ft. 30 units Plan 3 (Side by Side Garage) 3 bd., 3 ½ bath 1,809 sq. ft. 30 units Plan 4 (Side by Side Garage) 4 bd., 3 ½ bath 2,038 sq. ft. 22 units Total -- -- 95 units
Source: Danielian Associates Architects
● Amenities. This new development would include a one level 1,260 square foot clubhouse. The clubhouse would include a multi-purpose room, a covered patio, and a pool area. In addition to the common open space, each unit would have 150 square feet of ground level open space yard area and 100 square feet of open space on the upper level decks.13 ● Parking and Access. The proposed project would provide a total of 202 parking spaces including 190 spaces for residents and 24 parking spaces for guests. Each of the 95 units would be provided with two enclosed parking spaces in the garages. Of the total 190 enclosed parking spaces, 52 units would have side by side parking and 43 units would include tandem parking. Vehicular access would be 12 Danielian Associates Architects and Planners. Brandywine Homes. 6540 Rosemead Boulevard] Architectural Site Plan. January 1, 2023.
13 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 16
provide by a gated driveway with the east side of Rosemead Boulevard. The gates are setback from the Rosemead Boulevard right-of-way (ROW) 46-feet. The is room for cars to turn-around in the event the resent is not home to open the gate. The internal drive aisles would be 26-feet in width and would consist of two travel lanes.14
● Open Space and Landscaping. Landscaping would be installed around the site’s perimeter and along the development’s Rosemead Boulevard frontage. Common open space would total 25,047 square feet.15
The proposed project is summarized below in Table 4.

Table 4 Project Summary
Project Element Description Total Floor Area
Site Area 4.04-acres --
Building 1 9-plex (3 story residential bldg.) 22,564 sq. ft.

Building 2 6-plex (3 story residential bldg.) 14,591 sq. ft.

Building 3 6-plex (3 story residential bldg.) 14,591 sq. ft.

Building 4 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 5 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 6 8-plex (3 story residential bldg.) 17,622 sq. ft.

Building 7 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 8 6-plex (3 story residential bldg.) 14,591 sq. ft.

Building 9 9-plex (3 story residential bldg.) 22,564 sq. ft.

Building 10 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 11 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 12 8-plex (3 story residential bldg.) 17,622 sq. ft.

Building 13 8-plex (3 story residential bldg.) 17,662 sq. ft.

Building 14 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 15 5-plex (3 story residential bldg.) 12,282 sq. ft.

Building 16 Clubhouse 1,260 sq. ft.

Landscaping 25,047 sq. ft. --
Parking 202 spaces --
Danielian Associates Architects and Planners.

The proposed site plan is shown in Exhibit 6. Building elevations are provided in Exhibits 7 through 10. 14 Danielian Associates Architects and Planners. Brandywine Homes. 6540 Rosemead Boulevard] Architectural Site Plan. January 1, 2023.
15 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 17
EXHIBIT 6 SITE PLAN
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 18
EXHIBIT 7 BUILDING ELEVATIONS
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 19
EXHIBIT 8 BUILDING ELEVATIONS
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 20
EXHIBIT 9 BUILDING ELEVATIONS
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 21
EXHIBIT 10 BUILDING ELEVATIONS
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 22
EXHIBIT 11 BUILDING ELEVATIONS
Source: Danielian Associates Architects and Planners

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 23

5.0 CATEGORICAL EXEMPTION FINDINGS
The City of Pico Rivera is required to make the following environmental findings in support of this this Infill Exemption (refer to CEQA Guidelines §15332).16 The analysis in support of the findings is summarized under each finding and where required, a more detailed technical analysis is provided in the Appendices. ● Section 15332 (a). The project must be consistent with the applicable General Plan designation and all applicable General Plan policies as well as with the applicable zoning designation and regulations (refer to Section 5.1).
● Section 15332 (b). The proposed development site is located within the City limits on a project site of no more than five acres. The site is substantially surrounded by urban development (refer to Section 5.2).
● Section 15332 (c). The project site has no value as habitat for endangered, rare or threatened species (refer to Section 5.3).
● Section 15332 (d). The approval of the proposed project must not result in any significant effects relating to traffic, noise, air quality, or water quality (refer to Section 5.4). ● Section 15332 (e). The approval of the proposed project must not result in any significant effects on utilities and public services. (refer to Section 5.5).
● (Section 15300.2 [c][d][[e]). In addition to the above requirements, the proposed infill project must not result in any significant adverse impacts that would include any of the following impacts outlined herein in Section 5.6:
- The approval of the proposed project must not result in any dislocation impacts (refer to Section

5.6.1).
- The approval of the proposed project must not result in any impacts on sensitive environmental resources (refer to Section 5.6.2).
- The project must not impact scenic natural views (refer to Section 5.6.3). - The project site is not located within an area, nor does it include a site, the Department of Toxic Substances Control (DTSC) and the Secretary for Environmental Protection has identified as being on a Cortese site. (refer to Section 5.6.4).
- The proposed project would not result in any adverse impacts on historic resources (refer to Section 5.6.5).
● The proposed project would not require any permits or approvals from State responsible or trustee agencies (refer to Section 5.6.6).
16 CEQA Guidelines California Code of Regulations, Title 14, Division 6, Chapter 3, Article 19. Categorical Exemptions. (Section 153332).

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 24
FINDING 5.1. - LAND USE COMPATIBILITY (CEQA SECTION 15332 (A)

THRESHOLDS OF SIGNIFICANCE
To be categorically exempt, the proposed project must be consistent with the applicable City of Pico Rivera land use designations (General Plan and Zoning).

ENVIRONMENTAL ANALYSIS
The project site is located on a developed property that is currently designated as General Commercial (G-C) with a Mixed-Use (M-U) Overlay which permits Multiple Family Residential developments under the City of Pico Rivera Zoning Ordinance. The site is currently occupied by a two level motel (the Knights Inn Hotel) that consists of 100 guest rooms and other amenities. The project site’s elevation is approximately 165 feet above mean sea level (amsl) with a slight gradient towards the east. The surrounding land uses include the following:17
● North of the Site: A two level office building is located to the north of the site (6500 Rosemead Boulevard). This existing building is occupied by the United Auto Workers (UAW) Region 6. This area is zoned General Commercial (C-G).
18 ● South of the Site: A water well (Well No. 11) operated by Pico Water District, is located to the south of the site. A liquor store (6616 Rosemead Boulevard) is located on the northwest corner of Rosemead Boulevard and Carron Drive. Single-family homes are located further east, on the north site of Carron Drive. These homes have frontage along the north side of Carron Drive. This area is zoned as SingleFamily Residential (S-F) and General Commercial (C-G) ● West of the Site: The Rosemead Boulevard right-of-way (ROW) extends along the project site’s west side. Various office uses are located further west, along the west side of Rosemead Boulevard. This area is zoned as Profession Administrative (P-A).
19 ● East of the Site: Single-family homes are located to the east of the site. These homes have frontage on Bequette Avenue. This area is zoned as Single-Family Residential (S-F).20 The project and its proposed residential use are consistent with the existing surrounding land uses. Pico Rivera’s share of the applicable Regional Housing Needs Allocation (RHNA) for the 6th Cycle (2021-2029) planning period is as follows:
● Extremely Low Income Households 150 Units
● Very Low Income Households 299 units
● Low Income Households 146 units
● Moderate Income Households 149 units
17 Website accessed on March 11, 2024. Ibid.
18 Ibid.
19 Ibid.
20 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 25
● Above Moderate Income Households 430 units
The proposed 95 townhome units would enable the City to accommodate its current RHNA need for the above moderate housing units. The project is consistent with this finding and the impacts would be less than significant.

FINDING 5.2 - PROJECT SITE SIZE (CEQA SECTION 15332 (B)

THRESHOLDS OF SIGNIFICANCE
To be categorically exempt, the proposed project must be located within the City limits on a project site of no more than five acres. The site’s land area is 4.04-acres.

ENVIRONMENTAL ANALYSIS
The proposed project site is located within the corporate boundaries of the City of Pico Rivera on a project site consisting of less than five acres. The site’s land area is 4.04-acres (175,982 square feet). As indicated herein in Section 5.1, the site is surrounded by urban development. Therefore, less than significant project impacts would result.

FINDING 5.3 - HABITAT VALUE (CEQA SECTION 15332 (C)

THRESHOLDS OF SIGNIFICANCE
To be categorically exempt, the proposed project must be located on a site that has no value as habitat for endangered, rare or threatened species.

ENVIRONMENTAL ANALYSIS
The proposed project site in its entirety is fully developed with no areas of native and natural habitat. The site is covered-over in both impervious surfaces that includes the existing motel buildings and surface pavement and landscaped areas. The project site’s isolation from other natural open space areas limits its utility as a habitat or an animal migration corridor. The project site and the surrounding areas are not conducive for the survival of any special status species due to the lack of suitable riparian and/or natural habitat. Constant disturbance from traffic and other human activity further limits the site’s utility as a sensitive habitat or migration corridor.21 Since the site is located within an established urban area that extends along the Rosemead Boulevard corridor and lacks suitable habitat, the site’s utility as a natural habitat and migration corridor is restricted. No natural habitat is present in the area. Therefore, less than significant project impacts would result.
21 Google Maps and City of Pico Rivera Zoning Map. Website accessed on July 29, 2022.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 26
FINDING 5.4 - SIGNIFICANT EFFECTS (TRAFFIC, NOISE, AIR, PUBLIC SERVICES AND UTILITIES) (CEQA SECTION 15332 (D)

5.4.1 TRAFFIC

THRESHOLDS OF SIGNIFICANCE
To be categorically exempt, the proposed project must not result in any significant effects relating to traffic.

A significant traffic impact will be first determined by the number of vehicle trips that will be generated by the proposed project and the attendant vehicle miles travelled (VMT) impacts.

ENVIRONMENTAL ANALYSIS
Traffic Generation
The proposed project will be replacing the currently operational Knights Inn Pico Rivera. Since the Knights Inn is currently operational, trip credits were taken to account for the trips from the existing land use. As such, trip generation for this existing motel was developed using driveway survey counts at the existing project driveway for typical weekdays. The surveys were conducted on August 23rd, 24th, 29th and 30th, 2023. As a conservative estimate, the lowest of the driveway survey counts were subtracted from the estimated trip generation of the proposed townhomes to develop the net new project trip generation (refer to Table 5). The trip generation for the proposed project has been developed using the rates from the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition) for Land Use 220 – “Multifamily Housing (Low-Rise) Not Close to Rail Transit", Setting/Location – “General Urban/Suburban”. Trip generation for the Knights Inn was subtracted from the proposed project trip generation to determine the net new trips for the project. The net new project trip generation is summarized in Table 5.

Table 5 Project Trip Generation Overall, an esitated
Land Use ITE Code Quantity AM Peak
Hour
PM Peak
Hour
Average
Daily Traffic
(ADT)
Existing Trip Generation Rate
Existing Hotel 100 rooms 13 25 461
Proposed Project Trip Generation Rate
Proposed Low-rise Residential ITE 220 95 Units 39 48 640 Net Difference (Existing – Proposed)
-- -- 26 23 179
As shown in Table 5, the project is anticipated to generate 179 net new daily trips, with 26 net new trips occurring during the AM peak hour and 23 net new trips occurring during the PM peak hour. An estimated 40 average trips per hour would occur between 6:00 AM and 10:00 PM, excluding the AM and PM peak hours.

Project Driveway Sight Distance
A sight distance analysis was conducted at the project driveway along Rosemead Boulevard Frontage Road.

Sight distance is the length of the visible roadway a driver can see approaching vehicles before their line of

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 27
sight is blocked by any object. For purposes of this analysis, only the stopping sight distance and corner sight distance have been evaluated. That is because those are the only two sight distance issues that would affect safe maneuver of ingress/egress traffic from the project driveway. The stopping sight distance was evaluated on the roadway abutting the project (i.e., Rosemead Boulevard Frontage Road). A 25-mph speed limit was considered for local streets with no posted speed limits. Therefore, for the purpose of this analysis, a 25 mph speed limit has been considered as the design speed for Rosemead Boulevard Frontage Road. As stated in Table 201.1 of the HDM, the minimum stopping sight distance is 150 feet for a design speed of 25 mph.

Therefore, the minimum stopping sight distance has been considered as 150 feet for the Project Driveway along Rosemead Boulevard Frontage Road. Based on the requirements established in the HDM, it was determined that a minimum corner sight distance of 280 feet would be required for left-turn maneuvers and a minimum corner sight distance of 240 feet would be required for right-turn maneuvers. Since the corner sight distance required at the project driveway would be greater than the stopping sight distance, sight triangle figures were created using corner sight distance. As a conservative measure, left-turn corner sight distance were used for both right- and left-turn sight triangles for the project driveway. As a result, project driveway will provide adequate sight distance for left- and right-turn maneuvers onto Rosemead Boulevard Frontage Road.

Project Driveway and Intersection Spacing
The project driveway would be approximately 325 feet south of the intersection of Rosemead Boulevard Frontage Road/Coffman and Pico Road, respectively, and 410 feet north of the intersection of Rosemead Boulevard Frontage Road – Carron Road. As such, the driveway would not be within close proximity of any existing and future intersections, and there would be sufficient spacing between all existing and future intersections, including the project driveway intersection.

Project Parking
A total of 202 parking spaces is required for the project per City Code. Based on the current site plan, the project not only satisfies the City’s parking requirements but also offers an additional surplus of 12 accessible parking spaces in the project site. As such, the project provides adequate parking per the City’s parking requirements.

Vehicle Miles Travelled
The City has adopted thresholds of significance for determining impacts related to vehicle miles traveled (VMT) consistent with the California Office of Planning and Research’s Technical Advisory. The City has also adopted the County of Los Angeles Transportation Impact Analysis Guidelines which are used to determine whether a project would adequately reduce total VMT, and as such, determined the following screening criteria for certain land development projects that may be presumed to result in a less than significant VMT impact:
● Projects that result in a net increase of 110 or less daily vehicle trips. As discussed in the previous section and shown in Table 5, the project is estimated to generate 179 net new daily trips. Therefore, the project does not satisfy this criterion.
● Projects located in a High-Quality Transit Area (i.e., within half-mile distance of an existing rail transit station or located within half-mile of two or more existing bus routes with a frequency of service interval of 15 minutes or less during morning and evening peak hours). Given the project

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 28
consists of only residential land use, the City’s VMT per capita map was used to evaluate whether the project is in a low VMT Area. Based on the review of the City of Pico Rivera’s Daily Home-Based VMT per Capita screening map (Figure 3 of the TIS Guidelines), the project is not located in a low VMT area; therefore, this criterion does not apply to the project. ● Transit Proximity Area. The project is not located within an existing Transit Priority Area (TPA) but is located within the future TPA which is the Eastside Transit Corridor Phase 2 project to be completed in 2035, as shown in Figure 1 of the TIS Guidelines. The TIS Guidelines recommends that projects located within the future Transit Priority Area that are estimated to be completed after the Eastside Transit Corridor Phase 2 is operational are eligible to be screened out. However, Eastside Transit Corridor Phase 2 is estimated to be completed by the year 2035, while the project is estimated to be completed by 2025. Therefore, this screening criteria does not apply to the project. ● Project is locally serving retail (less than 50,000 square feet), including gas stations, banks, restaurants, shopping center. The project consists of residential land uses only; therefore, this screening criteria does not apply to the project.
● Local-serving community colleges, K-12 schools, local parks, daycare centers, etc. The project consists of residential land uses only; therefore, this screening criteria does not apply to the project. ● Residential projects with 100 percent affordable housing. The project consists of market-rate residential land uses only; therefore, this screening criteria does not apply to the project. ● Community institutions project (public library, fire station, local government). The project consists of residential land uses only; therefore, this screening criteria does not apply to the project. ● Local-serving hotels (e.g., non-destination hotels). The project consists of residential land uses only; therefore, this screening criteria does not apply to the project. ● Local-serving assembly uses (places of worship, community organizations). The project consists of residential land uses only; therefore, this screening criteria does not apply to the project. ● Public parking garages and parking lots. The project consists of residential land use only; therefore, this screening criteria does not apply to the project.
● Assisted living or senior housing projects. The project consists of market-rate residential land uses only; therefore, this screening criteria does not apply to the project. ● Affordable, supportive, or transitional housing projects. The project consists of market-rate residential land use only; therefore, this screening criteria does not apply to the project.

Based on the City’s Guidelines, if the project does not have a significant VMT impact under baseline scenario, and is consistent with the SCAG RTP/SCS, no further VMT analysis is necessary for the cumulative scenario evaluation. Since the project is consistent with the City’s General Plan Land Use designation, it is consistent with the SCAG RTP/SCS. Accessible EV parking and the provision of charging for electric vehicles in the residential units will encourage the use of EVs. The latest California Green Building Standards (CALGreen), California Building Code, requires provision of infrastructure to accommodate electric vehicle chargers for new single family and attached dwelling units/town houses. With consideration of the project design features, the project VMT impact would be improved. As a result, the trip generation, trip distribution, and site access impacts resulting from the proposed project would be less than significant.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 29

5.4.2 NOISE

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to noise. A significant noise impact would potentially result if the proposed project would potentially impact noise sensitive land uses in the area or create noise levels that would exceed located noise regulations. Consistent with the California Environmental Quality Act (CEQA) and the State CEQA Guidelines, a significant impact related to noise would occur if a proposed project were determined to result in any of the following impacts:
 Noise and Land Use Compatibility. The generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies; ● Ground-Borne Vibration Noise. The generation of excessive ground-borne vibration or groundborne noise levels; or ● Aircraft/Airport Noise Exposure. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels.

The most commonly used unit for measuring the level of sound is the decibel (dB). Zero on the decibel scale represents the lowest limit of sound that can be heard by humans. Noise levels may also be expressed as dBA where an “A” weighting has been incorporated into the measurement metric to account for increased human sensitivity to noise. The A-weighted measurements correlate well with the perceived nose levels at lower frequencies. Noise may be generated from a point source, such as a piece of construction equipment, or from a line source, such as a road containing moving vehicles. The eardrum may rupture at 140 dB. In general, an increase of between 3.0 dB and 5.0 dB in the ambient noise level is considered to represent the threshold for human sensitivity. In other words, increases in ambient noise levels of 3.0 dB or less are not generally perceptible to persons with average hearing abilities.22 Noise may be generated from a point source, such as machinery, or from a line source, such as a roadway segment containing moving vehicles. Because the area of the sound wave increases as the sound gets further and further from the source, less energy strikes any given point over the surface area of the wave. This phenomenon is known as “spreading loss.” Due to spreading loss, noise attenuates (decreases) with distance.

Stationary, or point, noise subject to spreading loss experiences a 6.0 dBA reduction for every doubling of the distance beginning with the initial 50-foot distance.23 Based on the principles of spreading loss noise levels would decrease by 6.0 dBA for every doubling distance beginning with the first 50 feet for point sources (speakers, construction equipment) and approximately 4.5 dBA over a soft surface such as vegetation. 24 Meanwhile, line sources (roadways, railroads) experience a 3.0 dBA reduction for every doubling of the 22 Bugliarello, et. al., The Impact of Noise Pollution, Chapter 127, 1975. 23 United States Department of Transportation – Federal Highway Administration. Transit Noise and Vibration Impact Assessment Manual. Report dated September 2018.
24 Ibid.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 30
distance. Objects that obstruct the line-of-sight between a noise source and a noise receptor reduce noise generated by or within the noise source. Operational noise is expected to decrease by an additional 6.0 dBA at the neighboring residential uses based on the principals of spreading loss.25

ENVIRONMENTAL ANALYSIS
The project site is located in an urbanized setting that contains both commercial and residential uses. The predominant source of noise in the area is related to traffic travelling on Rosemead Boulevard. An Extec Digital Sound Meter was used to conduct the on-site noise measurements. The noise levels were measured using the decibel (dB) metric. The dBA metric uses an “A” frequency weighting to allow for increased sensitivity during the night-time and early morning periods. For purposes of this analysis, the decibel (dB) metric and dBA metric should be considered the same. The noise meter was calibrated using an “A” weighting with the slow response setting. A series of 100 discreet noise measurements were recorded on Friday, March 8th, 2024, at 9:00 AM within a 30-minute time period at the project site (6540 Rosemead Boulevard). The average ambient noise level was recorded at 64.4 dBA, with the main source of ambient noise coming from street traffic travelling on Rosemead Boulevard. Table 6 indicates the variation in noise levels over time during the measurement period. For example, the L50 represents the noise levels that were exceeded during the measurement period 50 percent of the time (half the time the noise level exceeded this level and half the time the noise level was less than this level). The median ambient exterior noise level (L50) was 64.0 dBA at the measurement location.

Table 6 Noise Measurement Results
Noise Metric Noise Level (dBA)
Lmax (Maximum Noise Level) 71.7 dBA
L99 (Noise levels <99% of time) 70.5 dBA
L90 (Noise levels <90% of time) 69.1 dBA
L75 (Noise levels <75% of time) 65.8 dBA
Median Noise Level 64.0 dBA
Lmin (Minimum Noise Level) 59.4 dBA
Average Noise Level 64.4 dBA
Source: Blodgett Baylosis Environmental Planning
Noise and Land Use Compatibility Impacts.

The City of Pico Rivera has developed its own land use compatibility standards based on recommended parameters from the California Governor’s Office of Planning and Research (OPR) land use and noise compatibility guidelines. Based on these guidelines, the City has established interior and exterior noise standards for various types and/or categories of development. The City’s compatibility standards provide only for normally acceptable conditions based on State recommendations and City land use designations. For medium density residential development, the City’s noise compatibility standard is 45 dBA for interior noise 25 United States Department of Transportation – Federal Highway Administration. Transit Noise and Vibration Impact Assessment Manual. Report dated September 2018.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 31
exposure and 65 dBA for exterior noise exposure.26 The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Ground-Borne Vibration Noise
Composite construction noise is best characterized in a study prepared by Bolt, Beranek, and Newman.27 In the aforementioned study, the noisiest phases of construction are anticipated to be 89 dBA as measured at a distance of 50 feet from the construction activity. In later phases during building erection, noise levels are typically reduced from these values and the physical structures further break up line-of-sight noise. The City’s General Plan Noise Element Policy 11.3-1, Construction Noise, states that construction-related noise and vibration within 500 feet of noise-sensitive uses be limited to 7:00 a.m. to 7:00 p.m., and that haul truck deliveries be subject to the same hours specified for construction. The City does not have an established criterion for construction noise. The project contractors would be required to adhere to the City’s Noise Ordinance. Construction noise would include noise emanating from equipment such as backhoes, dozers, or graders. This noise would be attenuated by the exterior walls of the adjacent sensitive receptors, which would contribute to a reduction of up to 20 dBA with closed windows and a reduction of 10 dBA with open windows.28 In addition, the nearest sensitive receptor is approximately 20 feet south of the site. Adherence to the aforementioned Noise Ordinance requirements would ensure construction noise is kept to levels that are less than significant. Ground vibrations associated with construction activities using modern construction methods and equipment rarely reach the levels that result in damage to nearby buildings though vibration related to construction activities may be discernible in areas located near the construction site.

The interior noise levels would be reduced by complying with the California Green Building code, which requires the use energy efficient windows and insulation which would further reduce interior noise levels.

Insulation would be placed between the joists and studs and would serve as an additional buffer which, when combined with stucco and drywall, would reduce interior noise levels by a minimum of 10.0 dBA. Once occupied, the overall increase in the ambient noise levels would not be readily apparent to an individual with normal hearing. In addition, the project would not result in the exposure of nearby residents to the generation of excessive ground-borne noise due to the nature of the proposed use (no heavy machinery or equipment is anticipated to be in operation once the project is complete). The proposed project’s future residents would be required to adhere to all pertinent City noise regulations. Furthermore, the traffic associated with the proposed project would not be great enough to result in a measurable or perceptible increase in traffic noise (it typically requires a doubling of traffic volumes to increase the ambient noise levels to 3.0 dBA or greater).

As indicated previously, the proposed residential use would not result in a doubling of traffic volumes on Rosemead Boulevard. As a result, the traffic noise impacts resulting from the proposed project would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Aircraft/Airport Noise Exposure
There are no airports or airfields that are located in the City of Pico Rivera. The project site is not located within two miles of a public airport. The closest airport to the project site is the San Gabriel Valley Airport, 26 City of Pico Rivera General Plan Noise Element. Table N‐3. 27 USEPA, Protective Noise Levels. 1971.
28 California Department of Transportation. Technical Noise Supplement to the Traffic Noise Analysis Protocol – Table 7-1 FHWA Building Noise Reduction Factors. Report dated 2013.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 32
located more than 8 miles to the northeast in the City of El Monte.29 As a result, the project will not expose people working in the project area to excessive noise levels and no impacts will occur. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

5.4.3 AIR QUALITY

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to air quality. The South Coast Air Quality Management District (SCAQMD) has jurisdiction over a 10,743 square-mile area that includes Orange County, Los Angeles County (except for Antelope Valley), the non-desert portion of western San Bernardino County, and western Riverside County. The SCAQMD is responsible for the implementation of the protocols of the Federal Clean Air Act. In addition, the SCAQMD is responsible for ensuring that the more stringent California Clean Air standards are met. The SCAQMD is responsible for the formulation and implementation of a long-range plan referred to as the Air Quality Management Plan or AQMP that indicates how these objectives would be met. Projects in the South Coast Air Basin (SCAB) generating construction-related emissions that exceed any of the following emissions thresholds are considered to be significant under CEQA:
● 75 pounds per day of reactive organic compounds;
● 100 pounds per day of nitrogen dioxide;
● 550 pounds per day of carbon monoxide;
● 150 pounds per day of PM10;
● 55 pounds per day of PM2.5; or,
● 150 pounds per day of sulfur oxides.

The proposed project would have a significant long-term impact on air quality if any of the operational emission significance thresholds for criteria pollutants are exceeded:
● 55 pounds per day of reactive organic compounds;
● 55 pounds per day of nitrogen dioxide;
● 550 pounds per day of carbon monoxide;
● 150 pounds per day of PM10;
● 55 pounds per day of PM2.5; or,
● 150 pounds per day of sulfur oxides.30

ENVIRONMENTAL ANALYSIS
The analysis of daily construction and operational emissions was prepared utilizing the California Emissions Estimator Model (CalEEMod V.2022.1.1.22). As shown in Table 7, the daily construction emissions would not exceed the SCAQMD significance thresholds. The analysis of daily construction emissions has been prepared utilizing the California Emissions Estimator Model (CalEEMod V.2022.1.1.22) developed for the SCAQMD (these CalEEMod computer worksheets are attached as an Appendix to this CE. The project’s construction period would include the demolition of the existing motel, the construction of the 95 townhome 29 Google Earth. Website accessed October 18, 2021.
30 South Coast Air Quality Management District. Final 2016 Air Quality Plan [AQMP]. Adopted March 2017.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 33
units, and the finishing of the project (paving, painting, and the planting of landscaping). The Applicant has indicated the construction period would be 32 months. As shown in Table 7, daily construction emissions would not exceed the SCAQMD’s significance thresholds and represents a maximum-case scenario.

Therefore, the maximum daily construction-related emissions would be less than significant. The Applicant would be required to ensure that the contractors adhere to all pertinent provisions of SCAQMD Rule 403 pertaining to the generation of fugitive dust during grading and/or the use of equipment on unpaved surfaces.

The contractors would be responsible for being familiar with and implementing any pertinent best available control measures. As a result, the project would not result in significant impacts in this regard.

Table 7 Estimated Daily Construction Emissions (lb/day) Construction Phase ROG NOx CO SO2 PM10 PM2.5
Building Demolition (1 month) 2.4 22.2 19.9 0.03 0.92 0.84 Site Preparation (1 month) 3.31 31.6 30.2 0.05 21.07 11.36 Building Construction (10 months) 1.13 10.4 13.0 0.02 0.43 0.40 Paving (1 month) 1.0 7.12 9.94 0.01 0.32 0.29
Architectural Coatings (1 months) 32.72 0.86 1.13 -- 0.02 0.02 Maximum Daily Emissions 32.8 31.7 31.2 0.05 21.3 11.4
Daily Thresholds 75 100 55o 150 150 55
Significant Impact? No No No No No No
Source: CalEEMod V.2022.1.1.22.

Long-term emissions refer to those air quality impacts that would occur once the proposed project has been constructed and is operational. These impacts would continue over the operational life of the project. The two main sources of operational emissions include area emissions and on-site emissions related to the production and consumption of energy. Table 8 depicts the estimated project operational emissions related to the project’s operation. As indicated in Table 8 the projected maximum long-term emissions are below thresholds considered to represent a significant impact.

Table 8 Estimated Operational Emissions (lb/day)
Emission Source ROG NOx CO SO2 PM10 PM2.5
Mobile 2.09 1.52 15.4 0.03 3.06 0.78
Area 2.82 0.05 5.38 -- -- --
Energy 0.39 0.17 -- -- 0.03 0.03
Total 4.93 1.91 21.0 0.04 3.06 0.82
Daily Thresholds 55 55 55o 15o 15o 55
Significant Impact? No No No No No No
Source: CalEEMod V.2022.1.1.22.

Sensitive receptors refer to land uses and/or activities that are especially sensitive to poor air quality and typically include residences, board and care facilities, schools, playgrounds, hospitals, parks, childcare centers, and outdoor athletic facilities, and other facilities where children or the elderly may congregate.

These population groups are generally more sensitive to poor air quality. The nearest noise sensitive receptors to the project site are the single-family homes that extend along the project site’s southerly and easterly sides. The SCAQMD requires that CEQA air quality analyses indicate whether a proposed project

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 34
would result in an exceedance of localized emissions thresholds or LSTs. LSTs only apply to short-term (construction) emissions at a fixed location and do not include off-site or area-wide emissions. The pollutants that are the focus of the LST analysis include the conversion of NOx to NO2; carbon monoxide (CO) emissions from construction; PM10 emissions from construction; and PM2.5 emissions from construction. For purposes of the LST analysis, the receptor distance used was 25 meters since the nearest sensitive receptor abuts the project site on the south and east sides.

Table 9 Local Significance Thresholds Exceedance SRA 5 for 5-acre sites Emissions
Project
Emissions
(lbs./day)
Type
Allowable Emissions Threshold (lbs./day) and
a Specified Distance from Receptor (in meters)
25 5o 100 200 500
NOx 31.7/1.91 Construction/Operation 172 165 176 194 244 CO 31.2/21.0 Construction/ Operation 1,480 1,855 2,437 3,867 9,312 PM10 21.3* Construction 14 42 60 95 203
PM10 3.06 Operation 4 10 15 23 49
PM2.5 11.4* Construction 7 10 15 30 103
PM2.5 0.82 Operation 2 3 4 8 25
Source: CalEEMod V.2022.1.1.22
*=Does not include implementation of other SCAQMD Standard Conditions. The adherence to standard regulations would reduce fugitive dust emissions by 50%.

As shown in the Table 9, the proposed project would not result in an exceedance in LSTs. Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

5.4.4 WATER QUALITY

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to water quality. A significant water quality impact would potentially result if the proposed project would result in water pollution impacts on-site or offsite during construction or operations.

ENVIRONMENTAL ANALYSIS
The proposed project’s construction would not violate any water quality standards, waste discharge requirements, or otherwise degrade surface or groundwater quality. Construction of the proposed project would not include any significant new include grading, excavation, and other earthmoving activities that have the potential to cause erosion that would subsequently degrade water quality and/or violate water quality standards. As required by the Clean Water Act, the contractors/developer must comply with the Santa Ana Municipal Separate Storm Sewer (MS4) National Pollution Discharge Elimination System (NPDES) Permit.

The NPDES MS4 Permit Program, which is administered in the project area by the County of Los Angeles Regional Water Quality Control Board (RWQCB), regulates storm water and urban runoff discharges from developments to natural and constructed storm drain systems in the City. The contractor/developer would be required to obtain coverage under the General Permit for Discharges of Stormwater Associated with

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 35
Construction Activity. The implementation of the proposed project would not result in a violation in water quality standards or discharge requirements because the project contractors would be required to implement the operational Best Management Practices (BMPs) identified in the Erosion and Sediment Control Plan during construction and the operational BMPs identified in the Non-priority Water Quality Management Plan (NP-WQMP), for reducing runoff and potential contaminants. Adherence to the aforementioned City mandated requirements ensure that impacts remain less than significant. The project is consistent with this finding and the environmental impacts would be less than significant.

FINDING 5.5 - SIGNIFICANT EFFECTS ON UTILITIES AND PUBLIC SERVICES (CEQA SECTION 15332 (E)

5.5.1 UTILITIES

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to utilities. A significant impact on utilities would potentially result if the proposed project would require new utilities or service systems to accommodate potential demand.

ENVIRONMENTAL ANALYSIS
Sewers and Wastewater Treatment
There would be a total of 95 town home units. The proposed project is anticipated to generate 19,000 gallons per day (gpd) of wastewater. The City of Pico Rivera’s Sewer Division is responsible for the collection of wastewater within the City’s limits and delivery to the trunk sewer mains of Los Angeles County Sanitation District (LACSD). The collected wastewater flows south towards the Los Coyotes Water Reclamation Plant of LACSD in the city of Cerritos. The LACSD is responsible for all trunk sewer line and treatment. The Los Coyotes Water Reclamation Plant has a design capacity of 37.5 mgd. The projected sewer demand of 32,398 gpd represents approximately 0.507 percent of the wastewater treatment plant’s design capacity. As such, the proposed project would not result in or require the construction of new or expanded wastewater treatment facilities. The proposed project would connect to an existing 8-inch sewer line located in the project site. The existing and future sewage consumption for the existing use and the proposed project are indicated in Table 10.

Table 10 Projected Effluent Generation (in gallons/day) Project Element (Use) Unit of Measure Usage Factor Consumption Existing Motel 100 guest Rooms 125 gals./room 12,500 gals./day Proposed Project 95 Townhomes 200.0 gals./day/unit 19,000 gals./day Proposed Project 6,500 gals./day
Source: Blodgett Baylosis Environmental Planning.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 36
The existing and proposed sanitary sewer lines can accommodate the sewage flows from the proposed 95 units. Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Water
The proposed project would provide additional onsite domestic water connections onsite to accommodate the additional 95 townhome units. No off-site upgrades will be required. The estimated daily water consumption per unit is 300 gallons per day. Based on these rates, the proposed project would consume a total of 28,500 gallons per day. The proposed project would connect to an existing 12-inch water main along the project’s west side. The existing and future water consumption for the existing use and the proposed project are indicated in Table 11.

Table 11 Projected Water Consumption (in gallons/day)
Project Element (Use) Unit of Measure Usage Factor Consumption Existing Motel 100 guest Rooms 187 gals./day/room 18,700 gals./day Proposed Project 95 Townhomes 300.0 gals./day/unit 28,500 gals./day Total 9,800 gals./day
Source: Blodgett Baylosis Environmental Planning
Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Stormwater
The project site is located in an urbanized setting that contains commercial and residential uses. Overall, the amount of impervious surfaces would not measurably change. The existing storm drain system in the project site area includes a parkway culvert storm drain system in Rosemead Boulevard that collects existing street drainage flows from the roadway as well as on-site runoff and off-site adjacent properties runoff. The proposed project would include a storm drain system to collect, treat, and convey stormwater into the existing storm drain system and introduce pervious landscaping on the project site. Therefore, the proposed project would result in a less than significant impact and no mitigation measures are required.. Therefore, project impacts would be less than significant.

Solid Waste Collection
The proposed project is expected to generate 636 pounds of conventional solid waste per day. This figure assumes a generation rate of 12.23 pounds of waste per day per unit. The existing and future solid waste generation for the existing use and the proposed project are indicated in Table 12.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 37
Table 12 Projected Solid Waste Generation (in pounds [lbs]/day) Project Element (Use) Unit of Measure Usage Factor Generation Existing Motel 100 guest Rooms 6.0 lbs./day/room 600 lbs./day Proposed Project 95 Townhomes 12.23 lbs/day/units 1,162 lbs./day Total 562 lbs./day
Source: Los Angeles County Sanitation Districts
Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

5.5.2 PUBLIC SERVICES

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to public services. A significant impact on public services would potentially result if the proposed project would require new facilities or increased services to accommodate potential demand.

ENVIRONMENTAL ANALYSIS
Fire Department
Fire protection and emergency medical services in the city of Pico Rivera are provided by the Los Angeles County Fire Department (LACFD). Services include fire suppression, emergency medical, rescue and fire prevention, and hazardous materials coordination services. There are three existing fire stations within two miles of the project site. The first response station is Fire Station 103, located at 7300 S. Paramount Boulevard, The proposed project would not negatively impact fire protection services since the new units would be constructed in accordance with current fire and building codes.31 As part of the project review process, the LACFD would review the new housing development and make recommendations for fire protection services. The buildings’ construction, height, and use would not require any special equipment or apparatus in the event of a fire or emergency. the proposed project’s population and housing is consistent with the growth projections for the city of Pico Rivera. Further, the operation of the proposed project would contribute to property taxes that would help fund LACFD and hire more personnel, if needed. Development of the project would not result in the need for construction associated with an expansion of existing or development of a new fire station. Therefore, the project would result in less than significant impacts related to fire protection services. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Law Enforcement
Pico Rivera policing services are provided by the Los Angeles County Sheriff’s Department (LASD). The closest Sheriff’s station is the Pico Rivera Sheriff’s Station located at 6631 Passons Boulevard, 0.8 miles from the project site (see Figure 11). According to the LASD, the Pico Rivera Sheriff’s Station typically has a daily 31 Los Angeles County Fire Department. Fire Stations.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 38
staffing between 4-7 cars and 1-3 motorcycles. The LASD current response time within the service area is

34.5 minutes for routine calls, 9.3 minutes for priority calls, and 3.6 minutes for emergency calls, which is within policy standards. There are no existing deficiencies in police protection services within the City.

The proposed project may lead to an increase in demand for police protection services, such as increase in service calls and traffic enforcement, by adding new residents to the area, such an increase is within the projected growth for the City of Pico Rivera, and LASD has indicated that there are no existing deficiencies.

The proposed project would also include design elements that would discourage criminal activity, such as security gates, and residents-only key cards for the residential areas, as well as security lighting. LASD indicates that its primary source of funding for this station is through its contract with the city of Pico Rivera.

The proposed project would be required to pay all applicable impact fees and would contribute to applicable taxes to continue funding the police station. These fees are in place to address any incremental development project impact and are to be used for infrastructure improvements and services. The proposed project would not result in the need for new or physically altered police protection facilities. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Schools
The El Rancho Unified School District (District) would serve the proposed project. The District serves grades kindergarten through 12, with one Elementary School, one Middle School, and two High Schools. The proposed project would be required to pay all development fees required pursuant to Assembly Bill 2926 and Section 17620 of the California Government Code. The Applicant would be required to pay $2.63 per square foot to the El Rancho School District to offset the impact to school services. Therefore, impacts associated with schools would be less than significant and no mitigation would be required. The payment of the aforementioned school impact fees to the applicable school district is considered to be full mitigation for project-related impacts. The proposed project's school enrollment impacts would be offset by the school fees that would be paid by the developer. Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

Parks and Recreation
The City of Pico Rivera has approximately 102 acres of developed park and recreation facilities. The nearest park to the project site is Smith Park located approximately 1,500 feet to the north of the project site. This new development would include a one level 1,260 square foot clubhouse. The clubhouse would include a multi-purpose room, a covered patio, and a pool area. In addition to the common open space, each unit would have 150 square feet of ground level open space yard area and 100 square feet of open space on the upper level decks. The proposed project may be subject to the Quimby Act or pay in-lieu fees for park improvements.

Pursuant to the Quimby Act, the Applicant would pay its fair share of in-lieu fees based on the number and type of dwelling units. Therefore, project impacts would be less than significant. The proposed project is consistent with this finding and the environmental impacts would be less than significant.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 39
FINDING 5.6 - SIGNIFICANT EFFECTS RELATED TO INFILL DEVELOPMENT PROJECTS CEQA SECTION 15300 (C)(D)(E)
FINDING 5.6.1. - DISLOCATION

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to the displacement or dislocation of an existing population group. The emphasis is on the displacement of housing, especially affordable housing.

ENVIRONMENTAL ANALYSIS
The project site is currently occupied by an existing motel. This motel is a commercial development and is not being used for interim or supportive housing. The proposed project would be limited to the project site and no dislocation of off-site structural improvements would be required to accommodate the proposed project. Therefore, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts.

FINDING 5.6.2. - SENSITIVE ENVIRONMENTAL RESOURCES

THRESHOLDS OF SIGNIFICANCE
To be categorically exempt, the proposed project must be located on a site that has no impact on sensitive environmental resources.

ENVIRONMENTAL ANALYSIS
The project site is located in an urbanized setting that contains commercial and residential uses. The proposed project site in its entirety is fully developed with no areas of native and natural habitat. The site is covered over in both impervious surfaces that includes the existing buildings and surface pavement and landscaped areas. The project site’s isolation from other natural open space areas limits its utility as a habitat or an animal migration corridor. The project site and the surrounding areas are not conducive for the survival of any special status species due to the lack of suitable riparian and/or natural habitat. Constant disturbance from traffic, especially on Rosemead Boulevard, and other human activity further limits the site’s utility as a sensitive habitat or migration corridor.32 Since the site is within an established urban area that extends along the Rosemead Boulevard corridor and lacks suitable habitat, the site’s utility as a natural habitat and migration corridor is restricted. Therefore, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts. 32 Google Maps and City of Pico Rivera Zoning Map. Website accessed on March 11, 2024.

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 40
FINDING 5.6.3. - SCENIC NATURAL VIEWS

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to a significant impact on a scenic vista. A scenic vista is a viewpoint that provides expansive views of a highly valued landscape for the benefit of the public.

ENVIRONMENTAL ANALYSIS
The project site is located in an urbanized setting that contains commercial and residential uses. No scenic natural resources or scenic corridor would be affected by the proposed project. Because of the nature of the proposed project, no alteration of the views would occur. Therefore, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts.

FINDING 5.6.4. - CORTESE LISTING

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not be located on a property that has been identified by the Department of Toxic Substances Control (DTSC) and the Secretary for Environmental Protection as being located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5

ENVIRONMENTAL ANALYSIS
Government Code Section 65962.5 refers to the Hazardous Waste and Substances Site List, commonly known as the Cortese List. The Cortese List is a planning document used by the State and other local agencies to comply with CEQA requirements that require the provision of information regarding the location of hazardous materials release sites. A search was conducted through the California Department of Toxic Substances Control Envirostor website to identify whether the project site is listed in the database as a Cortese site.33 The search indicates the project site is not located on a Cortese site. Therefore, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts.

FINDING 5.6.5. - HISTORIC RESOURCES

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not result in any significant effects relating to the historic resources. According to CEQA, a project may be deemed to have a significant adverse impact on cultural resources if it results in any of the following:
33 California, State of. Department of Toxic Substances Control. https://www.envirostor.dtsc.ca.gov/public/map/

CITY OF PICO RIVERA CATEGORICAL EXEMPTION AND ENVIRONMENTAL ASSESSMENT ROSEMEAD TOWNHOMES ● 6540 ROSEMEAD BOULEVARD ● PICO RIVERA, CALIFORNIA CLASS 32 INFILL DEVELOPMENT EXEMPTION PAGE 41
● The proposed project would cause a substantial adverse change in the significance of a historical resource pursuant to §15064.5.
● The proposed project would cause a substantial adverse change in the significance of an archaeological resource pursuant to §15064.5.
● The proposed project would disturb any human remains, including those interred outside of formal cemeteries.

Historic structures and sites are defined by local, State, and Federal criteria. A site or structure may be historically significant if it is locally protected through a General Plan or historic preservation ordinance. In addition, a site or structure may be historically significant according to State or Federal criteria even if the locality does not recognize such significance. The California Register of Historical Resources (CRHR) is a listing of all properties considered to be significant historical resources in the state. The California Register includes all properties listed or determined eligible for listing on the National Register, including properties evaluated under Section 106, and State Historical Landmarks No. 770 and above. The California Register statute specifically provides that historical resources listed, determined eligible for listing on the California Register by the State Historical Resources Commission, or resources that meet the California Register criteria are resources which must be given consideration under CEQA. Other resources, such as resources listed on local registers of historic resources or in local surveys, may be listed if they are determined by the State Historic Resources Commission to be significant.

ENVIRONMENTAL ANALYSIS
The project site is not included on the City’s list of designated historic resources. Thus, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts.

FINDING 5.6.6. - STATE TRUSTEE OR RESPONSIBLE AGENCY APPROVAL

THRESHOLDS OF SIGNIFICANCE
The approval of the proposed project must not require any approvals from a State responsible or trustee agency.

ENVIRONMENTAL ANALYSIS
The proposed project would not require any review by a state trustee or responsible agency. No encroachment permit to a State Highway would be required as part of the proposed project’s implementation. Therefore, no project impacts would result. The proposed project is consistent with this finding and there would be no environmental impacts.

CONCLUSIONS
Based on the analysis provided in this Categorical Exemption, the project meets and complies with the conditions and requirements of Class 32 (Infill Exemption) and would not have any significant environmental impacts.

CITY OF PICO RIVERA CITY COUNCIL

NOTICE OF PUBLIC HEARING TO CONSIDER THE APPROVAL OF VESTING TENTATIVE TRACT MAP 84271
NOTICE IS HEREBY GIVEN that a public hearing will be held before the City of Pico Rivera City Council to consider the approval of the following: Vesting Tentative Tract Map 84271, a request by Brandywine Homes to subdivide a parcel for a 95-unit townhome development on a 4.04-acre lot located at 6540 Rosemead Boulevard (Assessor Property Number 6378-017-004).

WHEN: Tuesday , April 23, 2024
TIME: 6:00 P.M.

WHERE: City Hall Council Chambers
6615 Passons Boulevard
Pico Rivera, CA 90660
This project has been assessed in accordance with the authority and criteria contained in the California Environmental Quality Act (CEQA, Public Resources Code Sections 21000 et seq.), the State CEQA Guidelines (California Code of Regulations, Title 14, Sections 15000 et seq.), and the environmental regulations of the City. Upon review, the project qualifies for a Class 32 Categorical Exemption (In-Fill Development Projects) in accordance with the requirements of Section 15332 of the State CEQA Guidelines.

PERSONS INTERESTED IN THIS MATTER wishing to observe the meeting may do so in the following ways:
(1) Turn your TV to Channel 3;
(2) City’s website at http://www.pico-rivera.org/depts/admin/pio/programming.asp; (3) Email public comments to [email protected] prior to 4:00 p.m. on the day of the meeting;
(4) Attend the Public Hearing in person
Copies of all relevant material including project specifications are available to the public for review in the Community & Economic Development Department at City Hall, 6615 Passons Boulevard, Pico Rivera, California. Additional information may be found at the City’s website at https://www.picorivera.org/private-projects/. Please contact Aneli Gonzalez, Assistant Planner at 562-801-4307 for additional questions.

If you challenge the consideration or adoption of the proposed applications in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or written correspondence delivered to the City of Pico Rivera City Clerk at, or prior to, the public hearing.
****************************************************************************************************************** In compliance with the Americans with Disabilities Act of 1990, the City of Pico Rivera is committed to providing reasonable accommodations for a person with a disability. Please contact Cynthia Ayala at (562) 801-4389 if special program accommodations are necessary and/or if program information is needed in an alternative format. Special requests must be made in a reasonable amount of time in order that accommodations can be arranged.

Enclosure 4
1d
Project Location
REUNION DEL CONCEJO DE PICO RIVERA AVISO DE AUDIENCIA PÚBLICA PARA CONSIDERAR LA APROBACIÓN DEL MAPA DEL TRACTO TENTATIVO 84271 POR LA PRESENTE SE NOTIFICA que se llevará a cabo una audiencia pública antes el Concejo Municipal de Pico Rivera para considerar la aprobación de lo siguiente: Mapa Tentativo del Tracto 84271, una solicitud de Brandywine Homes para desarrollar casas adosadas de 95 unidades y un edificio recreativo con piscina en un lote de 4.04 acres ubicado en 6540 Rosemead Boulevard (Tasador Numero de Propiedad 6378-017-004).

CUÁNDO: Martes, 23 de Abril de 2024
HORA: 6:00 P.M.

DÓNDE: Cámara del Consejo (Pico Rivera City Hall)
6615 Passon Boulevard
Pico Rivera, CA 90660
Este proyecto ha sido evaluado de acuerdo con la autoridad y los criterios contenidos en la Ley de Calidad Ambiental de California (CEQA, Código de Recursos Públicos, Secciones 21000 y siguientes), las Pautas de la CEQA del Estado (Código de Regulaciones de California, Título 14, Secciones 15000 y siguientes), y la normativa ambiental de la Ciudad. Tras la revisión, el proyecto califica para una Exención Categórica de Clase 32 (Proyectos de Desarrollo de Relleno) de acuerdo con los requisitos de la Sección 15332 de las Directrices Estatales de CEQA.

LAS PERSONAS INTERESADAS EN ESTE ASUNTO que deseen observar la reunión pueden hacerlo de las siguientes maneras:
(1) Encienda su televisor en el Canal 3;
(2) Sitio web de la ciudad en http://www.pico-rivera.org/depts/admin/pio/programming.asp; (3) Enviar comentarios públicos por correo electrónico a [email protected] antes de las 4:00 p. m. el día de la reunión;
(4) Asistir personalmente a la Audiencia Pública
Las copias de todo el material relevante, incluyendo las especificaciones del proyecto, están disponibles para el público para su revisión en el Departamento de Desarrollo Económico y Comunitario en el Ayuntamiento, 6615 Passons Boulevard, Pico Rivera, California. Se puede encontrar información adicional en el sitio web de la Ciudad en https://www.pico-rivera.org/privateprojects/. Comuníquese con Aneli González, Planificadora Asistente al 562-801-4307 si tiene preguntas adicionales.

Si impugna la consideración o adopción de las solicitudes propuestas en el tribunal, es posible que se limite a plantear solo aquellas cuestiones que usted u otra persona hayan planteado en la audiencia pública descrita en este aviso, o la correspondencia escrita entregada al Secretario Municipal de la Ciudad de Pico Rivera en o antes de la audiencia pública. ******************************************************************************************************** De conformidad con la Ley de Estadounidenses con Discapacidades de 1990, la Ciudad de Pico Rivera se compromete a proporcionar adaptaciones razonables para una persona con discapacidad.

Comuníquese con Cynthia Ayala al (562) 801-4389 si se necesitan adaptaciones especiales del programa y/o si se necesita información del programa en un formato alternativo. Las solicitudes especiales deben hacerse en un período de tiempo razonable para que se puedan organizar las adaptaciones.

Localización del Proyecto
To: Mayor and City Council
From: City Manager
Meeting Date: April 23, 2024
Subject: PUBLIC HEARING – FISCAL YEAR 2024-2025

COMMUNITY DEVELOPMENT BLOCK GRANT ANNUAL

ACTION PLAN APPROVAL
Recommendation:

1. Approve a resolution authorizing the City Manager, or designee, to submit the fiscal year 2024-2025 Annual Action Plan to the U.S. Department of Housing and Urban Development; and

2. Authorize the City Manager to enter into agreements with eligible subrecipients and purchase of supplies, programs, and equipment as noted in the fiscal year 2024-2025 Annual Action Plan and budget.

Fiscal Impact:

There is no fiscal impact to the General Fund as a result of the approval of the Fiscal Year (FY) 2024-2025 Community Development Block Grant (CDBG) Annual Action Plan. It is anticipated that the City will receive $550,000 in CDBG funds. The attached FY 2024-2025 CDBG budget (Enclosure 2), reflects the projected appropriation of the FY 2024-2025 funding and projected expenditures and will be presented to the City Council with the FY 2024-25 Citywide Budget for appropriation.

Background:

The City of Pico Rivera (City) receives an annual funding allocation in Community Development Block Grant (CDBG) funds from the U.S. Department of Housing and Urban Development (HUD). These funds are used to develop viable communities by promoting integrated approaches that provide and expand economic opportunities for low- and moderate-income people. Examples include public services programs, social services, and economic development activities. Each year, the City prepares an Annual Action Plan in connection with the five-year Consolidated Plan, which details how the City will spend its allocated CDBG funds.

The Annual Action Plan has two (2) principal purposes:
• Identify the projects and programs to be undertaken during the upcoming fiscal year, and the proposed objectives and outcomes to be achieved within the overall context of the five-year Consolidated Plan; and 2 CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
PUBLIC HEARING – FISCAL YEAR 2024-2025 COMMUNITY DEVELOPMENT

BLOCK GRANT ANNUAL ACTION PLAN APPROVAL

Page 2 of 4 ends

• Act as the City’s application process for federal formula grants, comprised of the CDBG programs.

Activities funded with CDBG must meet at least one (1) of the following objectives:
• Benefit low- and moderate-income persons;
• Aid in the prevention or elimination of slums or blight; and • Meet a need having a particular urgency (referred to as urgent need).

Priority funding for CDBG activities are typically given to activities that:
• Have a high benefit to low- and moderate-income persons; • Have a detailed plan for permanent funding;
• Are likely to achieve their objectives and be successful; • Use other public and private sources to the greatest extent possible; • Support or coordinate with other community development efforts; • Present a reasonable, sound budget; and
• Are implemented by organizations with a solid track record.

Discussion:

On January 19, 2024, the City issued a notice inviting community-based organizations, non-profits, city departments, and residents to submit proposals for CDBG funds to deliver public services in the Pico Rivera community. The deadline for proposal submissions was February 8, 2024. To assist potential applicants, a Public Services Technical Assistance Workshop was conducted on January 31, 2024, to answer any questions. City staff thoroughly reviewed all applications and collaborated closely with applicants to ensure that all required documentation was provided to establish program eligibility for funding of proposed activities.

In accordance with the HUD-approved Citizen Participation Plan, the City is required to hold a 30-day public comment period and publish a public notice specifying the date, time, and location of a public hearing to adopt the Annual Action Plan. The City hosted this 30-day public comment period from March 22, 2024, to April 23, 2024. The draft Action Plan, outlining the City's proposed uses of CDBG funds, was made available for public review during this period, with a notice published in Los Cerritos Community News.

HUD has not yet announced the final funding allocations for FY 2024-2025. The proposed allocations are based on estimates derived from the previous year's funding levels. Funding for activities may need to be adjusted after HUD announces final allocations.

CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
PUBLIC HEARING – FISCAL YEAR 2024-2025 COMMUNITY DEVELOPMENT

BLOCK GRANT ANNUAL ACTION PLAN APPROVAL

Page 3 of 4 ends

The City’s estimated CDBG entitlement allocation for FY 2024-2025 is $550,000.

Additionally, the City has approximately $132,356 in CDBG funds available to commit from prior fiscal years. This provides the City a total of $682,356 in available funds to program in FY 2024-2025.

The proposed new CDBG estimated funding allocations for FY 2024-2025 are below:

Program Activity/Project Funding
Recommendation
Program Administration* $99,500
Fair Housing Services* $10,500
Southeast Area Social Services Funding Authority** $40,000 Heart of Compassion** $42,500
Handyworker Grant Program $125,000
Teen Center Renovation Project $364,856
Total $682,356
* Subject to 20% Administration cap
** Subject to 15% Public Service cap
Staff recommends allocating funds to the above-listed activities, which are further outlined below:
• Program administration funds are utilized for administration and planning activities, such as general management, oversight, preparing budgets and schedules, and preparing reports and other HUD-required documents. These funds help cover the consultant costs for the administration of the program.

Planning and administration costs are capped to 20% of the program year’s allocated CDBG entitlement, plus any program income received during that year. • The City is required to provide fair housing resources via a provider who can provide guidance and mediation for fair housing issues and complaints involving landlords and tenants. Fair housing activities are eligible administrative activities, and these costs are also subject to the 20% administration cap. • The Southeast Area Social Services Funding Authority (SASSFA) provides congregate meals at the Senior Center and home delivered meals to senior Pico Rivera residents. In addition to meals, SASSFA provides home chores/personal care and respite services. These are public service activities with costs capped to 15% of the program year’s allocated CDBG entitlement, plus any program income received during that year.
• Heart of Compassion plans to offer direct assistance to low-income Pico Rivera residents by distributing fresh fruits, vegetables, and other essential items twice a CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024
PUBLIC HEARING – FISCAL YEAR 2024-2025 COMMUNITY DEVELOPMENT

BLOCK GRANT ANNUAL ACTION PLAN APPROVAL

Page 4 of 4 ends

week. As public service activities these costs are also subject to the 15% public service cap.
• The Handyworker Grant Program is a home rehabilitation program. It allows up to $30,000 in grant funds for low-income homeowners with critical home repair needs. Staff recommends allocating $125,000 to this program for the upcoming fiscal year.
• Infrastructure and Public Facilities Improvements: Additional CDBG funds are recommended for allocation towards facility improvements at the Pico Rivera Youth Center. The additional funds support necessary change orders for the completion of this project. An extra $364,856 will be added to the prior year’s CDBG program allocation of $348,812, resulting in a total of $713,668 in CDBG funding to go towards the Youth Center Renovation Project.

Environmental Analysis:

The plan has been reviewed with respect to the applicability of the California Environmental Quality Act (Public Resources Code Section 21000 et seq.) (CEQA). City staff has determined that the approval of the Annual Action Plan and budget does not have the potential for creating a significant effect on the environment and is therefore exempt from further review under CEQA pursuant to State CEQA Guidelines Section 15060(c)(3) because it is not a project as defined by the CEQA Guidelines Section 15378. Adoption of the resolution does not have the potential for resulting in either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment.

Conclusion:

It is recommended that the City Council approve a resolution authorizing the City Manager, or designee, to submit the FY 2024-2025 Annual Action Plan to HUD and enter into agreements with eligible subrecipients for the purchase of supplies, programs and equipment.

Steve Carmona
SC:AB:JG:EL:jj
Enclosures: 1) Resolution
2) Budget
3) FY 2024-2025 Annual Action Plan
4) Public Notice
RESOLUTION NO. ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PICO
RIVERA, CALIFORNIA, APPROVING THE FISCAL YEAR 2024-2025 ANNUAL ACTION PLAN IN ACCORDANCE WITH THE U.S.

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

REGULATIONS
WHEREAS, the U.S. Department of Housing and Urban Development (“HUD”) requires all jurisdictions that receive federal entitlement funds to prepare an Annual Action Plan that identifies the projects and programs to be funded with Community Development Block Grant (“CDBG”); and
WHEREAS, a fiscal year (FY) 2024-2025 Annual Action Plan was prepared which identifies several programs and projects for the fiscal year that are funded through the City of Pico Rivera’s (“City”) FY 2024-2025 estimated entitlement of $550,000; and WHEREAS, City issued a notice soliciting proposals on January 19, 2024, from community-based organizations, non-profits, City departments, and residents interested in applying for these funds and providing services to the Pico Rivera community with a deadline to submit applications/proposals by February 8, 2024; and WHEREAS, City staff published a public notice announcing the development of the aforementioned plans in the March 22, 2024, edition of the Los Cerritos Community News and a draft of the Annual Action Plan was uploaded on the City’s Housing Services Division website for public review.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pico Rivera as follows:

SECTION 1. The City Council does hereby declare that the above recitals are true and correct and incorporated herein by reference.

SECTION 2. The City Council of the City of Pico Rivera does hereby approve the FY 2024-2025 Annual Action Plan and budget.

SECTION 3. The City Manager, or designee, is hereby authorized to make all conforming modifications and edits and to execute all implementing documents required by HUD to receive and reallocate funding identified under the approved Annual Action Plan.

SECTION 4. The City Manager is hereby authorized to enter into agreements with eligible subrecipients.

Enclosure 1
2a
RESOLUTION NO. ____
PAGE 2 OF 2
SECTION 5. The City Clerk shall certify the passage and approval of this resolution, and it shall thereupon be in full force and effect.

APPROVED AND PASSED this 23rd day of April, 2024.

Andrew C. Lara, Mayor
ATTEST: APPROVED AS TO FORM:
_________________________________ ___________________________________ Cynthia Ayala, CMC, City Clerk Arnold M. Alvarez-Glasman, City Attorney AYES:

NOES:

COMMUNITY DEVELOPMENT BLOCK GRANT
DRAFT FISCAL YEAR (FY) 2024-2025 BUDGET
FY 23-24
BUDGET
FY 23-24

PROJECTED

EXPENDITURES

PROJECTED

ACTIVITY

BALANCE

AT END OF
FY 23-24
FY 24-25
BUDGET
A B A – B = C
HUD ENTITLEMENT ALLOCATION $559,364 $550,000* $550,000* FUNDS AVAILABLE TO COMMIT $132,356
TOTAL BUDGET $682,356
ADMINISTRATION (20% CAP) = $110,000*
Program Administration $101,372 $101,372 $ – $99,500
Fair Housing Services $10,500 $10,500 $ – $10,500
ADMINISTRATION TOTAL $111,872 $111,872 $ – $110,000

PUBLIC FACILITIES & INFRASTRUCTURE
Teen Center Renovation Project – Construction $348,812 $348,812 $ – $364,856

PUBLIC FACILITIES & INFRASTRUCTURE
TOTAL
$348,812 $348,812 $ – $364,856

AFFORDABLE HOUSING
Handyworker Grant Program $125,000 $ – $125,000** $125,000 AFFORDABLE HOUSING TOTAL $125,000 $ – $125,000** $125,000 PUBLIC SERVICES (15% CAP) = $82,500*
Southeast Area Social Services Funding
Authority
$44,000 $44,000 $ – $40,000
Heart of Compassion $39,904 $39,904 $ – $42,500
PUBLIC SERVICES TOTAL $83,904 $83,904 $ – $82,500
TOTAL APPROVED BUDGET $669,588 $544,588 $125,000** $682,356 * Based on an estimated FY 2024-2025 HUD entitlement amount. ** Funds allocated for the Handyworker Grant Program in FY 2023-2024 are anticipated to remain unspent due to the need to issue a competitive bid process for an administrator. Funding is expected to be carried over and reallocated at a forthcoming City Council public hearing.

Enclosure 2
2b
Annual Action Plan 1
OMB Control No: 2506-0117 (exp. 09/30/2021)
Fiscal Year 2024-2025 Annual Action Plan
Community & Economic Development Department
DRAFT
POSTED 3/22/2024
REVISED 3/28/2024
Enclosure 3
2c
Annual Action Plan 2
OMB Control No: 2506-0117 (exp. 09/30/2021)
Table of Contents
Executive Summary.......................................................................................................................................3 AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b) ........................................................................3 PR-05 Lead & Responsible Agencies – 91.200(b)......................................................................................6 AP-10 Consultation – 91.100, 91.200(b), 91.215(l)...................................................................................7 AP-12 Participation – 91.105, 91.200(c) .................................................................................................13 Expected Resources....................................................................................................................................14 AP-15 Expected Resources – 91.220(c)(1,2) ...........................................................................................14 Annual Goals and Objectives......................................................................................................................17 Projects ...................................................................................................................................................19 AP-35 Projects – 91.220(d) .....................................................................................................................19 AP-38 Project Summary ..........................................................................................................................20 AP-50 Geographic Distribution – 91.220(f).............................................................................................24 Affordable Housing .....................................................................................................................................25 AP-55 Affordable Housing – 91.220(g) ...................................................................................................25 AP-60 Public Housing – 91.220(h)...........................................................................................................26 AP-65 Homeless and Other Special Needs Activities – 91.220(i)............................................................27 AP-75 Barriers to affordable housing – 91.220(j) ...................................................................................30 AP-85 Other Actions – 91.220(k) ............................................................................................................32 Program Specific Requirements..................................................................................................................35 Annual Action Plan 3
OMB Control No: 2506-0117 (exp. 09/30/2021)
Executive Summary
AP-05 Executive Summary - 24 CFR 91.200(c), 91.220(b)

1. Introduction
The 2024-2025 Annual Action Plan for the City of Pico Rivera satisfies the requirements to receive Community Development Block Grant (CDBG) funds from the U.S. Department of Housing and Urban Development (HUD). The CDBG program was created by the Housing and Community Development Act (HCDA) of 1974. The primary objective of the CDBG program is to develop viable urban communities by providing decent housing, a suitable living environment, and economic opportunities, principally for persons of low- and moderate-income.

Regulations governing the CDBG program require that each activity undertaken with CDBG funds meet one of the three national objectives:
• Benefit low- and moderate-income persons.
• Aid in the prevention or elimination of slums and blight. • Meet a community development need having a particular urgency.

As a recipient of CDBG funds, the City is required to prepare a five-year strategic plan that identifies housing and community needs, prioritizes these needs, and develops a strategic plan to address priority needs. This document is called the Consolidated Plan. The City’s most recent Consolidated Plan covers the fiscal years 2020-2025. On an annual basis, the City prepares an annual action plan that identifies the specific activities the City will undertake with its annual CDBG allocation to meet the priority needs identified in the Consolidated Plan. Fiscal Year (FY) 2024-2025 is the fifth year of the Consolidated Plan cycle.

For FY 2024-25, the City’s CDBG Entitlement grant is estimated at $550,000. Additionally the City anticipates having approximately $132,356 of carryover and previously unprogrammed CDBG funds; this provides the City a total of $682,356 in available funds to program in FY 2024- 2025. The City does not anticipate any program income.

2. Summarize the objectives and outcomes identified in the Plan The 2020-2025 Consolidated Plan is a five-year strategic plan that utilizes an extensive analysis of housing and community market data to identify priority needs. Corresponding goals and objectives for the use of CDBG funds are established and are carried out through the development of the Annual Action Plan.

Annual Action Plan 4
OMB Control No: 2506-0117 (exp. 09/30/2021)
The following are high priority activities that have been identified as part of the five-year Consolidated Plan period:
• Housing Rehabilitation
• Neighborhood Preservation
• Promote Fair Housing
• Public Facilities and Infrastructure
• Public Services
• Emergency Services
• CDBG Administration
The table below summarizes the goals/objectives and outcomes identified in the 2020-2025 Consolidated Plan:

Sort
Order
Goal Name Start
Year
End
Year
Category Geographic
Area
Objective/Needs
to Address
Goal Outcome Indicator
1 Affordable
Housing
2020 2025
Affordable
Housing
Citywide Provide decent
affordable
housing
Homeowner Housing
Rehabilitated:
50 Households/
Housing
Units
2 Neighborhood
Preservation
2020 2025
Non-Housing
Community
Development
Neighborhood
Preservation
Citywide Maintain and
promote
neighborhood
preservation
Housing Code
Enforcement/Foreclose
d Property Care:
500
Households/Housing
Units
3 Fair Housing
2020 2025
Affordable
Housing
Citywide Affirmatively
further fair
housing
Public Service
Activities Other than
Low/Moderate Income
Housing Benefit:
550 Persons Assisted
4 Public Services
2020 2025
Public Services Citywide Provide public
services for
extremely low,
low and
moderateincome
residents
Public Service
Activities Other than
Low/Moderate Income
Housing Benefit:
2,000 Persons Assisted
Annual Action Plan 5
OMB Control No: 2506-0117 (exp. 09/30/2021)

3. Evaluation of past performance
FY 2023-24, the fourth year of the City’s 2020-2025 Consolidated Plan cycle, is not yet complete. The evaluation below is based on the City’s performance in meeting the prior year’s Annual Action Plan goals as noted in the FY 2022-2023 Consolidated Annual Performance and Evaluation Report (CAPER). A summary of prior accomplishments is listed below:

Through the Handy Worker Program, three (3) homes were rehabilitated. The program helps senior, disabled, and/or low- or moderate- income homeowners.

Public services were provided to 378 low- or moderate- income individuals.

Fair Housing services were provided to 93 Pico Rivera residents through Southern California Housing Rights Center.

4. Summary of Citizen Participation Process and Consultation Process As required by HUD, the public was provided an opportunity to review and comment on the draft 2024-2025 Annual Action Plan. The draft Action Plan was available for public review for and comment for a minimum of 30 days from March 22, 2024 to April 23, 2024. Copies of the Action Plan were available to the public on the City’s website.

5. Summary of public comments
Pending – to be updated after public hearing.

6. Summary of comments or views not accepted and the reasons for not accepting them Pending – to be updated after public hearing.

7. Summary
The Annual Action Plan serves as the link between the Consolidated Plan objectives developed to address priority housing and community needs with the use of federal resources (i.e., CDBG).

The Annual Action Plan provides specific information regarding the resources and activities the City will utilize to address priority needs and specific objectives identified in the Consolidated Plan during a 12-month period. The implementation of the FY 2024-2025 Action Plan will begin July 1, 2024, and end June 30, 2025. The Annual Action Plan will serve as the City’s application to HUD for the anticipated $550,000 in CDBG funds for FY 2024-2025, and as an expenditure plan for grant funds, prior year grant funds, and program income resources.

Annual Action Plan 6
OMB Control No: 2506-0117 (exp. 09/30/2021)
PR-05 Lead & Responsible Agencies – 91.200(b)

1. Agency/entity responsible for preparing/administering the Consolidated Plan Describe the agency/entity responsible for preparing the Consolidated Plan and those responsible for administration of each grant program and funding source.

Agency Role Name Department/Agency
CDBG Administrator City of Pico Rivera Community & Economic Development Department
Table 1 – Responsible Agencies
Narrative (optional)
The City of Pico Rivera’s Community and Economic Development Department is primarily responsible for administration of CDBG funds. The City is not a direct recipient of HUD HOME grant funds.

Consolidated Plan Public Contact Information
Julia Gonzalez, Deputy Director
Community & Economic Development Department
6615 Passons Boulevard, Pico Rivera, CA 90660
T: (562) 801-4447 | F: (562) 949-0280
Annual Action Plan 7
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-10 Consultation – 91.100, 91.200(b), 91.215(l)

1. Introduction
As required by HUD, nonprofits and community residents were provided an opportunity to review and comment on the draft 2024-2025 Annual Action Plan.

Residents were encouraged to participate in a public hearing held on April 23, 2024. The draft Annual Action Plan was available for public review and comment for a minimum of 30 days, March 22, 2024 to April 23, 2024. Copies of the Action Plan were available to the public on the City’s website.

Provide a concise summary of the jurisdiction’s activities to enhance coordination between public and assisted housing providers and private and governmental health, mental health and service agencies (91.215(l))
The principal provider of community development and economic development programs, housing projects, and financial support is the City of Pico Rivera. The Pico Rivera Housing Assistance Agency administers the Section 8 Voucher program. Activities to be undertaken by the Housing Assistance Agency are identified in the Public Housing Agency (PHA) Five-Year Action Plan.

Activities to enhance coordination between public and assisted housing providers and governmental health, mental health, and service agencies are conducted on a regular basis including inviting applications from various (i.e., housing, mental health, etc.) providers.

Continued coordination is anticipated for planning efforts, as well as project implementation, between all these groups.

Describe coordination with the Continuum of Care and efforts to address the needs of homeless persons (particularly chronically homeless individuals and families, families with children, veterans, and unaccompanied youth) and persons at risk of homelessness.

The City coordinates the delivery of homeless services with the Los Angeles Homeless Services Authority (LAHSA). For over 20 years, LAHSA has been the primary applicant to HUD on behalf of the Los Angeles Continuum of Care. LAHSA provides grants to homeless organizations in Pico Rivera. These programs provide support services and shelter opportunities for situationally homeless individuals and families, and the chronically homeless.

The City of Pico Rivera is also a member of the Gateway Cities Council of Governments (COG) which leads efforts to address homelessness within the southeast Los Angeles County Annual Action Plan 8
OMB Control No: 2506-0117 (exp. 09/30/2021)
region. COG members collaborate and continually seek funding to develop a plan to advance individuals from homelessness to a stable and productive life. Existing models of success have been identified in the work of the Gateway Cities Ad Hoc Committee on Homelessness.

CDBG funding is also provided to social services organizations to assist low-income Pico Rivera residents in need of assistance.

Describe consultation with the Continuum(s) of Care that serves the jurisdiction's area in determining how to allocate ESG funds, develop performance standards for and evaluate outcomes of projects and activities assisted by ESG funds, and develop funding, policies and procedures for the operation and administration of HMIS.

The City of Pico Rivera is not a recipient of ESG funds thus it is not involved in the allocation of ESG funds, developing performance standards, program outcomes, or operational/Homeless Management Information System (HMIS) policies and procedures.

2. Describe Agencies, groups, organizations and others who participated in the process and describe the jurisdiction’s consultations with housing, social service agencies and other entities
The agencies and organizations below participated in the consultation during the City’s Consolidated Plan and remain active partners with the City to enhance the coordination of services to City residents.

Table 2 – Agencies, groups, organizations who participated 1 Agency/Group/Organization Housing Rights Center
Agency/Group/Organization Type Services-Fair Housing
What section of the Plan was addressed by Consultation? Fair Housing Briefly describe how the Agency/Group/Organization was
consulted. What are the anticipated outcomes of the
consultation or areas for improved coordination?
Organization providesinput on
fair housing issues, and
landlord/tenant complaints.
2 Agency/Group/Organization Los Angeles Housing Services Authority (LAHSA)
Agency/Group/Organization Type Services-Homeless
Annual Action Plan 9
OMB Control No: 2506-0117 (exp. 09/30/2021)
What section of the Plan was addressed by Consultation? Homeless Needs Homeless Strategy Continuum of
Care
Briefly describe how the Agency/Group/Organization was
consulted. What are the anticipated outcomes of the
consultation or areas for improved coordination?
Input was obtained via website
and published reports.

City homeless count, strategies,
and ongoing coordination.
3 Agency/Group/Organization Habitat for Humanity
Agency/Group/Organization Type Housing
What section of the Plan was addressed by Consultation? Housing Need Assessment Briefly describe how the Agency/Group/Organization was
consulted. What are the anticipated outcomes of the
consultation or areas for improved coordination?
Via public services application
and e-mail.

Homeowner housing
rehabilitation needs
4 Agency/Group/Organization Los Angeles County Department of Health
Agency/Group/Organization Type Services – Persons with HIV/AIDS Services – Childhood Lead Based
Paint Poisoning
What section of the Plan was addressed by Consultation? Data on People Living with

HIV/AIDS (PLWA)
Lead Based Paint Strategy
Briefly describe how the Agency/Group/Organization was
consulted. What are the anticipated outcomes of the
consultation or areas for improved coordination?
Via reviews of published reports
Improved coordination on
addressing lead-based paint
hazards
Annual Action Plan 10
OMB Control No: 2506-0117 (exp. 09/30/2021)
Identify any Agency Types not consulted and provide rationale for not consulting.

No agency was knowingly excluded from the consultation process.

Annual Action Plan 11
OMB Control No: 2506-0117 (exp. 09/30/2021)
Other local/regional/state/federal planning efforts considered when preparing the Plan.

Name of Plan Lead Organization How do the goals of your Strategic Plan overlap with the goals of each plan?
State Plan for Independent Living (SPIL) for
2021- 2023
State Independent Living Council (SILC) The Strategic Plan has goals in support of the State Plan for Independent living for seniors and those
who may be frail and/or disabled.

Los Angeles Continuum of Care Los Angeles Homeless Services Authority (LAHSA)
The Continuum of Care identifies funding and
activities assisting LA County’s homeless.

The City’s homeless goals and strategy support
those of the Continuum of Care.

Area Plan on Aging
July 1, 2024 to June 30, 2028
Area Plan Update
July 1, 2023 to June 30, 2024
Los Angeles County PSA 19 The Strategic Plan supportive housing goals for the elderly and frail elderly support those of the Area
Plan on Aging.

Los Angeles County Comprehensive HIV Plan
(2017-2021)
Los Angeles County Commission on HIV
County of Los Angeles Department of
Public Health
The Strategic Plan includes goals based on the
goals, needs and strategies identified in the
County’s Comprehensive HIV Plan.
2014-2021 Housing Element of the General
Plan
City of Pico Rivera Primary policy document for the development of affordable and market rate housing to address
current and future needs.

Capital Improvement Plan City of Pico Rivera Multi-year public facility and infrastructure improvement plan.

Table 3 – Other local / regional / federal planning efforts Annual Action Plan 12
OMB Control No: 2506-0117 (exp. 09/30/2021)
Narrative (optional)
None
Annual Action Plan 13
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-12 Participation – 91.105, 91.200(c)

1. Summary of citizen participation process/Efforts made to broaden citizen participation To ensure residents were aware of the draft 2024-2025 Annual Action Plan, the City published a notice in the Los Cerritos Community Newspaper which announced a 30-day public review period for the plan and announced a City Council-held public hearing.

Citizen Participation Outreach
Sort Order Mode of Outreach Target of Outreach Summary of response/attendance
Summary of
comments received
Summary of comments
not accepted
and reasons
1 Public Hearing
City Council Mtg.
09/12/2023
Non-targeted/
broad community
No public comments
received.

No public
comments
received.

N/A
2 Public Notice
Published
03/22/2024
Non-targeted/
broad community

N/A N/A N/A
3 Public Review
Period
03/22/2024-
04/23/2024
Non-targeted/
broad community

N/A N/A N/A
4 Public Hearing
City Council –
04/23/2024
Non-targeted/
broad community
Pending – to be
updated after
public hearing.

Pending – to be
updated after
public hearing.

Pending – to be
updated after public
hearing.

Table 4 – Citizen Participation Outreach
Annual Action Plan 14
OMB Control No: 2506-0117 (exp. 09/30/2021)
Expected Resources
AP-15 Expected Resources – 91.220(c)(1,2)
Introduction
Anticipated Resources
Program Source
of
Funds
Uses of Funds Expected Amount Available Year 1 Expected Amount
Available
Remainder
of ConPlan
$
Narrative Description
Annual
Allocation:
$
Program
Income: $
Prior Year
Resources: $
Total:
$
CDBG
Public -
Federal
Acquisition,
Admin &
Planning,
Economic
Development,
Housing,
Public
Improvements,
Public Services
$550,000 $0.00 $132,356 $682,356 $0
A formula-based
program that
annually allocates
funds to
metropolitan
cities, urban
counties, and
statesfor a wide
range of eligible
housing and
community
development
activities.

Table 5 - Expected Resources – Priority Table
Explain how federal funds will leverage those additional resources (private, state and local funds), including a description of how Annual Action Plan 15
OMB Control No: 2506-0117 (exp. 09/30/2021)
matching requirements will be satisfied.

The City will attempt to leverage grants and other funding when appropriate to meet the objectives of the Annual Action Plan.

As needed and available, the City will allocate local funds to undertake CDBG Administration, Housing Services Activities, ADA public facility improvement projects, and other activities that support local organizations that provide social services for residents.

Annual Action Plan 16
OMB Control No: 2506-0117 (exp. 09/30/2021)
If appropriate, describe publicly owned land or property located within the jurisdiction that may be used to address the needs identified in the plan.

There is no publicly owned land that is available at this time to address the needs described in the Consolidated Plan. However, the City does explore opportunities to partner with nonprofits to address unmet housing needs.

Discussion
N/A
Annual Action Plan 17
OMB Control No: 2506-0117 (exp. 09/30/2021)
Annual Goals and Objectives
AP-20 Annual Goals and Objectives
Goals Summary Information
Sort
Order
Goal Name Start
Year
End
Year
Category Geographi
c Area
Needs Addressed Funding Goal Outcome Indicator
1 Affordable Housing 2024 2025 Affordable
Housing Citywide Provide decent
affordable housing
CDBG:
$125,000
Homeowner Housing
Rehabilitated:
4 Household/Housing Units
2 Fair Housing 2024 2025 Affordable
Housing Citywide Affirmatively furtherfair housing
CDBG:
$10,500 80 Persons Assisted
3 Public Services 2024 2025 Public Services Citywide
Provide public services
for extremely- low to
moderate- income
residents
CDBG:
$82,500
Public Service Activities
Other than Low/Moderate
Income Housing Benefit:
425 Persons Assisted
4 Public Facilities and
Infrastructure 2023 2025
Non-Housing
Community
Development
Citywide
Construct or upgrade
public facilities and
infrastructure
CDBG:
$364,856
Public Facility or
Infrastructure
Activities Other than
Low/Moderate Income
Housing Benefit:
100 Persons Assisted
5 Administration 2024 2025 Administration Citywide Administration CDBG:
$99,500
Other:
0 other
Table 6 – Goals Summary
Annual Action Plan 18
OMB Control No: 2506-0117 (exp. 09/30/2021)
Goal Descriptions
1 Goal Name Affordable Housing
Goal
Description CDBG funds will be used to help low/moderate income homeowners to rehabilitate their homes. 2 Goal Name Fair Housing
Goal
Description
CDBG funds will be used to pay for fair housing services to promote equal housing opportunity and affirmatively further fair housing.
3 Goal Name Public Services
Goal
Description CDBG funds will be used to provide a variety of public services. 4 Goal Name Public Facilities and Infrastructure
Goal
Description CDBG funds will be used to upgrade and construct public facilities and infrastructure. 5 Goal Name Administration
Goal
Description CDBG funds will be used to implement the funded activities and projects.

Annual Action Plan 19
OMB Control No: 2506-0117 (exp. 09/30/2021)
Projects
AP-35 Projects – 91.220(d)
Projects
# Project Name
1 CDBG PROGRAM ADMINISTRATION
2 FAIR HOUSING (ADMIN)
3 SOUTHEAST AREA SOCIAL SERVICES FUNDING AUTHORITY
4 HEART OF COMPASSION
5 HANDYWORKER GRANT PROGRAM
6 TEEN CENTER RENOVATION- CONSTRUCTION
Table 7 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs.

CDBG funds have been allocated to address the housing and services of City residents.

Services are aimed at providing a safety net for at risk populations (e.g., seniors, low-income households at risk of becoming homeless), and to help maintain safe and decent housing and neighborhoods.

Annual Action Plan 20
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-38 Project Summary
Project Summary Information
1 Project Name CDBG PROGRAM ADMINISTRATION
Target Area City Wide
Goals Supported CDBG Grant Administration
Needs Addressed Administration
Funding CDBG: $99,500
Description Program Management and Oversight
Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
N/A
Location Description 6615 Passons Boulevard, Pico Rivera, CA 90660 Planned Activities CDBG Administration
2 Project Name FAIR HOUSING (ADMIN)
Target Area City Wide
Goals Supported Promote equal housing opportunity
Needs Addressed Promote equal housing opportunity
Funding CDBG: $10,500
Annual Action Plan 21
OMB Control No: 2506-0117 (exp. 09/30/2021)
Description CDBG funds will be used to provide fair housing services to residents to prevent discrimination,
provide referrals, investigations, case
management, and litigation, and resolve landlord
tenant disputes.

Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
80 persons assisted
Location Description City Wide
Planned Activities Fair housing activities.
3 Project Name SOUTHEAST AREA SOCIAL SERVICES FUNDING AUTHORITY (SASSFA)
Target Area City Wide
Goals Supported Support special needs programs and services Needs Addressed Support special needs programs and services Funding CDBG: $40,000
Description Senior Nutrition Services at the Senior Center and home delivered meals.

Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
400 Households
Location Description City Wide
Annual Action Plan 22
OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities Senior Nutrition Services at the Senior Center and home delivered meals.
4 Project Name Heart of Compassion
Target Area City Wide
Goals Supported Support special needs programs and services Needs Addressed Support special needs programs and services Funding CDBG: $42,500
Description Provide direct assistance to low-income persons through the public distribution of fresh fruits, vegetables, and other essential items two times a week.

Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
25 Households
Location Description City Wide
Planned Activities Provide direct assistance to low-income persons through the public distribution of fresh fruits, vegetables, and other essential items two times a week.
5 Project Name HANDYWORKER GRANT PROGRAM
Target Area City Wide
Goals Supported Provide decent affordable housing
Needs Addressed Provide decent affordable housing
Funding CDBG: $125,000
Description Home rehabilitation program that offers grants to lowincome homeowners for critical home repair needs Annual Action Plan 23
OMB Control No: 2506-0117 (exp. 09/30/2021)
Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
4 households
Location Description City Wide
Planned Activities Home rehabilitation program that offers grants to lowincome homeowners for critical home repair needs 6 Project Name TEEN CENTER RENOVATION- CONSTRUCTION
Target Area City Wide
Goals Supported Public Facilities and Infrastructure
Needs Addressed Public Facilities and Infrastructure
Funding CDBG: $364,856
Description CDBG funds will be used for upgrades to the teen center. Additional funds are being added to the existing activity to cover additional costs. With the additional funds the overall project total is $713,668.

Target Date 6/30/2025
Estimate the number and type of
families that will benefit from the
proposed activities
Improvement will benefit low to moderate income youth
who visit the center.

Location Description City Wide
Planned Activities CDBG funds will be used for upgrades to the teen center.

Additional funds are being added to the existing activity to cover additional costs.

Annual Action Plan 24
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-50 Geographic Distribution – 91.220(f)
Description of the geographic areas of the entitlement (including areas of low-income and minority concentration) where assistance will be directed.

CDBG program funds will be expended based on program criteria. For example, public services are available on a citywide basis for qualified beneficiaries; Capital Improvement Projects will target eligible low-moderate income areas; fair housing and program administration activities will also be carried out on a citywide basis.

Geographic Distribution
Target Area Percentage of Funds
Citywide 100
Table 8 - Geographic Distribution
Rationale for the priorities for allocating investments geographically.

As the City’s CDBG-eligible areas tend to be older sections of the City, area-wide activities will help to improve and sustain neighborhoods.

Discussion
CDBG-funded services will be available citywide.

Annual Action Plan 25
OMB Control No: 2506-0117 (exp. 09/30/2021)
Affordable Housing
AP-55 Affordable Housing – 91.220(g)
Introduction
One Year Goals for the Number of Households to be Supported Homeless 0
Non-Homeless 350
Special-Needs 0
Total 350
Table 9 - One Year Goals for Affordable Housing by Support Requirement One Year Goals for the Number of Households Supported Through Rental Assistance 0
The Production of New Units 0
Rehab of Existing Units 4
Acquisition of Existing Units 0
Total 4
Table 10- One Year Goals for Affordable Housing by Support Type Discussion
An estimated four housing units will be rehabilitated during the FY 2024-2025, which will help support households maintain affordable housing. The Pico Rivera Housing Assistance Agency will also provide rental assistance to 350 households (total vouchers).

Annual Action Plan 26
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-60 Public Housing – 91.220(h)
Introduction
Neither the City of Pico Rivera, nor the City's Housing Assistance Agency, own or operate public housing. The City’s Housing Assistance Agency does provide rental assistance vouchers and certificates to eligible households (leased up vouchers).

Actions planned during the next year to address the needs of public housing.

Not applicable.

Actions to encourage public housing residents to become more involved in management and participate in homeownership.

Not applicable.

If the PHA is designated as troubled, describe the manner in which financial assistance will be provided or other assistance.

Not applicable.

Discussion
Not applicable.

Annual Action Plan 27
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-65 Homeless and Other Special Needs Activities – 91.220(i) Introduction
Pico Rivera recognizes its responsibility to assist at risk households and the homeless as such, it has designated homelessness prevention as a high priority for the community; emergency and transitional shelters are also designated as high priority needs. City partnerships with local agencies support client outreach and assessment.

Describe the jurisdiction’s one-year goals and actions for reducing and ending homelessness including reaching out to homeless people (especially unsheltered persons) and assessing their individual needs.

The City makes use of and partners with available County resources to outreach and address issues pertaining to homelessness. The Los Angeles Homeless Services Authority (LAHSA) operates the Los Angeles County Homeless Outreach Portal where anyone in the City (i.e., City staff, business owners, residents) can request that a County homeless outreach team be dispatched to assess a person’s needs and potentially make a referral for additional services.

Addressing the emergency shelter and transitional housing needs of homeless people.

The City is an active participant in regional homeless planning efforts including those of LAHSA. Through these efforts, the City can coordinate the use of limited CDBG funds to address local homeless needs and contribute to a regional strategy to reduce homelessness. CDBG public service grants may be used to provide a safety net for area residentsthat are also at risk of becoming homeless.

Helping homeless persons (especially chronically homeless individuals and families, families with children, veterans and their families, and unaccompanied youth) make the transition to permanent housing and independent living, including shortening the period of time that individuals and families experience homelessness, facilitating access for homeless individuals and families to affordable housing units, and preventing individuals and families who were recently homeless from becoming homeless again.

Permanent housing and independent living are the end goal of the City’s homeless prevention efforts. To this end, the City will encourage service providers to make every effort to minimize the amount of time an individual/household remain homeless, provide access to affordable housing, and to minimize recidivism. In recent years, the "housing first" model has been implemented by several homeless service providers. These rapid rehousing programs have helped reduce the number of those experiencing homelessness Annual Action Plan 28
OMB Control No: 2506-0117 (exp. 09/30/2021)
by providing permanentshelter and criticalsupportive services.

Helping low-income individuals and families avoid becoming homeless, especially extremely low-income individuals and families and those who are: being discharged from publicly funded institutions and systems of care (such as health care facilities, mental health facilities, foster care and other youth facilities, and corrections programs and institutions); or, receiving assistance from public or private agencies that address housing, health, social services, employment, education, or youth needs.

Although the City has limited funds, it is committed to assisting low-income individuals and families avoid experiencing homelessness. The City is an active participant in regional homeless planning efforts including those of LAHSA. Through these efforts, the City can coordinate the use of limited CDBG funds to address local homeless needs and contribute to a regional strategy to reduce homelessness. CDBG public service grants can provide a safety net for area residents that are also at risk of becoming homeless.

The City of Pico Rivera is actively engaged in a range of coordinated efforts and active collaboration among community organizations, the business community and concerned residents dedicated to overcoming homelessness in our community. The City currently engages a full-time Sheriff’s Deputy who assists the unsheltered in the city. The City of Pico Rivera partners with the following non-profits that assist low-income individuals and families to avoid homelessness:

Whittier First Day- local non-profit organization which provides the following services:
transitional bridge housing, on-site meals, clothing, 12 step meetings, education, training, employment assistance, transportation, on-site health clinic, health screenings, mental health services, and case management.

The Whole Child - provides children, adolescents, and families in the community with affordable, culturally sensitive, and professional mental services. Services include free parenting education in English and Spanish, child abuse prevention, anger management classes, substance abuse help, and counseling for teens.

LosAngelesHomeless ServicesAuthority (LAHSA)- which is a joint government agency that is responsible for addressing homelessness in our region. LAHSA also operated the County Homeless assistance portal LA-HOP.org, which is an outreach portal designed to allow government agencies and residents to initiate an outreach referral and connect a person experiencing homelessness directly to local services.

Annual Action Plan 29
OMB Control No: 2506-0117 (exp. 09/30/2021)
People Assisting the Homeless (PATH) - Lead agency assisting single adults experiencing homelessness within our community. PATH helps people find permanent housing and provides case management, medical and mental healthcare, benefits advocacy, employment training, and other services to people experiencing homelessness.

Jovenes- Assists youth ages 18-25. Provides housing assistance, healthcare, education, employment, and trauma recovery.

Transit Deputy – Serve as point of contact for people experiencing homelessness throughout the City. The Los Angeles County Deputy provides in-the-field case management (connect persons to shelter, food, and housing). He also serves as the lead on encampment clean-ups and addresses local business concerns related to homelessness.

Discussion
The City also makes referrals to 2-1-1 which is a comprehensive informational and referral system linking Los Angeles County residents to community health and human services and support. 2-1-1 connects people every day to shelters, food, low-cost counseling, subsidized childcare, employment services, and a range of services for individual and family selfsufficiency.

The programs identified above, which address various needs that can help support individuals or families avoid homelessness, demonstrate that addressing this issue is complex and requires many partners to come to the table. The City is fortunate that it can utilize this network of agencies to provide housing and supportive services.

Annual Action Plan 30
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-75 Barriers to affordable housing – 91.220(j)
Introduction:

Barriers to affordable housing and actions to overcome barriers are detailed in the City’s Housing Element and mirrored in the Consolidated Plan.

Actions it planned to remove or ameliorate the negative effects of public policies that serve as barriers to affordable housing such as land use controls, tax policies affecting land, zoning ordinances, building codes, fees and charges, growth limitations, and policies affecting the return on residential investment.

The City will utilize several policies intended to provide additional flexibility in housing site planning and promote more intense development where appropriate:
• The City’s Housing Sites Inventory Program helps ensure that the City continuously monitors available sites in the area that may be appropriate for residential uses. • Density Floor is another tool that can be used to promote the maximum use of residential land. The Density Floor would establish a minimum density requirement within a given residential land-use designation. The availability of developable acreage in upper density ranges allows for the development of certain types of housing.
• The City will continue to consider alternate forms of residential development, including various types of small-lot, single-family subdivisions; mobile home parks that allow owner-occupied spaces; senior citizen multifamily housing developments offering various degrees of care and assistance; mixed-use residential, and planned unit developments.
• Developers will be encouraged to pursue projects providing low- and moderateincome housing. California has provided regulations to govern the approval process, permitting greater density for affordable housing projects that include additional incentives to the developer. The City utilizes this Density Bonus to encourage developers interested in additional density with an incentive to develop a portion of their market rate project as affordable to low- and moderate- income households.

Discussion:

The Pico Rivera Housing Element and 2020-2025 Consolidated Plan identify barriers to the provision of affordable housing and provided a strategy to address barriers. Outlined above are steps the City identified it will undertake during the 2020-2025 planning period Annual Action Plan 31
OMB Control No: 2506-0117 (exp. 09/30/2021)
to overcome barriers. These actions will continue to be implemented during FY 2024-25.

Annual Action Plan 32
OMB Control No: 2506-0117 (exp. 09/30/2021)
AP-85 Other Actions – 91.220(k)
Introduction:

Outlined below are the actions the City will implement to address the “Other” sub-strategies of the Consolidated Plan.

Actions planned to address obstacles to meeting underserved needs.

The City of Pico Rivera’s 2020-2025 Consolidated Plan proposes projects and activities to meet housing and community priorities needs. The Plan includes programs, projects, and activities to be undertaken that address the needs of the underserved in Pico Rivera.

Specific activities to be carried out during FY 2024-25 include the following:
• Support for nonprofit agencies, particularly those that provide social services for special needs populations, i.e. – senior and lower income households with a cost burden.
• Programs that improve the living environment of low- and moderate-income families residing in substandard housing, e.g., handy worker repairs/improvements, public facility/infrastructure improvements. • Programsthat promote fair housing, especially among lower income households.

Actions planned to foster and maintain affordable housing.

In general, the City will utilize several policies to provide flexibility in housing site planning and to promote more intense development where appropriate. The City’s Housing Sites Inventory Program helps ensure that the City monitors available sites that may be appropriate for residential uses. The City will also continue to consider alternate forms of residential development, including small-lot, single-family subdivisions; mobile home parks that allow owner-occupied spaces; senior citizen multifamily housing developments offering various degrees of care and assistance; mixed-use residential, office and commercial developments; and planned unit developments. Additionally, the City will encourage developers to pursue projects providing low- and moderate-income housing by providing incentives such as a density bonus. If appropriate and available, subsidies to offset the cost of acquisition, development or project-related off-site improvements may be considered.

Actions planned to reduce lead-based paint hazards.

HUD’s Lead Based Paint regulations require all units assisted with CDBG and HOME Annual Action Plan 33
OMB Control No: 2506-0117 (exp. 09/30/2021)
funds be inspected and abated. The City does not receive HOME funds, but its CDBG Handyworker program guidelines include measures to ensure compliance with the regulations which comply with the requirements of Lead Safe Housing Regulation 24 CFR Part 35 effective September 15, 2000, and the subsequent September 2000 HUD transition assistance policy. The City will refer any cases of suspected lead poisoning to the Los Angeles County Public Health Department for investigation.

Additionally, in accordance with current federal regulations, the City of Pico Rivera’s policy regarding lead-based paint hazards states that all housing units that receive some form of City housing rehabilitation assistance, that were built prior to 1978, must undergo lead- based paint testing prior to receiving funding for rehabilitation. If deteriorated lead-based paint surfaces are found, they must be stabilized during the rehabilitation of the property. Abatement must be performed by a certified lead-based paint professional, and a Clearance Inspection must be issued by the certified lead-based paint assessor prior to the issuance of a Notice of Completion.

Actions planned to reduce the number of poverty-level families.

The activities and services the City will provide during FY 2024-25 to combat and prevent poverty include the following:
• Preserve affordable housing options for residents including housing rehabilitation assistance and federal rental assistance via Housing Choice Voucher and Certificates administered by the Pico Rivera Housing Assistance Agency. • Provide public services to assist lower-income seniors and households to improve their quality of life.

Actions planned to develop institutional structure.

The City has tried to develop an institutional structure that will help identify and access resources to improve the community. The City will continue to work with nonprofit entities to deliver public services. As a partner of LAHSA, the City will provide critical information to the County of Los Angeles for preparation of the County’s Continuum of Care Homeless Assistance grant applications. Pico Rivera will provide critical information regarding mainstream funds the City will make available to serve the homeless and will also assist in identifying and prioritizing gaps and needs in the regional system of care. Additionally, the Annual Action Plan 34
OMB Control No: 2506-0117 (exp. 09/30/2021)
City will continue to assist the Housing Authority implement its Five-year Public Housing Authority (PHA) Plan.

The City is also a participant in the Gateway Cities Council of Governments (COG) which is addressing homelessnessin southeast Los Angeles County region. COGmembersrepresent a variety of local, County, and special districts government agencies. The COG model helps break down existing institutional barriers and create new opportunities for cooperativebased regional solutions.

Actions planned to enhance coordination between public and private housing and social service agencies.

The City’s Community and Economic Development Department works closely with other City departments and the community to develop programs and activities that improve lowand moderate-income neighborhoods throughout Pico Rivera. The administration of program activities includes housing, public facility and infrastructure improvements, public and social service activities, and economic development activities. The City collaborates with public agencies, for-profit agencies, and non-profit organizations to provide the programming and services. As outlined above,the City also participatesin numerous efforts to coordinate short- term and long-term solutions to regional issues.

Discussion:

HUD regulations require that the City prepare an Analysis of Impediments to Fair Housing choice (Al). In addition to identifying fair housing impediments, a strategy to overcome barriers must be developed and implemented; accomplishments are to be reported annually. The City has updated the document and prepared a new AI for the time-period of FY 2020-21 through 2024-25.

The City's current AI evaluates existing demographic data, past fair housing enforcement activity, city- specific mortgage lender data, and existing housing and land use public policies. Based on an analysis of this data, and the input of residents, a list of impediments to fair housing choice was developed. A corresponding set of action steps to ameliorate these barriers was also prepared.

Annual Action Plan 35
OMB Control No: 2506-0117 (exp. 09/30/2021)
Program Specific Requirements
AP-90 Program Specific Requirements – 91.220(l)(1,2,4)
Introduction:

Community Development Block Grant Program (CDBG)
Reference 24 CFR 91.220(l)(1)
Projects planned with all CDBG funds expected to be available during the year are identified in the Projects Table. The following identifies program income that is available for use that is included in projects to be carried out.

1. The total amount of program income that will have been received before the start of the next program year and that has not yet been reprogrammed 0 2. The amount of proceeds from section 108 loan guarantees that will be used during the year to address the priority needs and specific objectives identified in the grantee's strategic plan
0 3. The amount of surplus funds from urban renewal settlements 0

4. The amount of any grant funds returned to the line of credit for which the planned use has not been included in a prior statement or plan. 0 5. The amount of income from float-funded activities 0 Total Program Income 0
Other CDBG Requirements

1. The amount of urgent need activities 0

PROOF OF PUBLICATION
(2015.5 C.C.P.)
Los Cerritos Community Newspaper Group
13017 Artesia Blvd., Suite C-102
Cerritos CA 90703
(562) 407-3873

STATE OF CALIFORNIA,

COUNTY OF LOS ANGELES
I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years,
and not a party to or interested in the above-entitled
matter.

I am the principal clerk of the printer of the Los Cerritos Community News, a newspaper of general circulation, printed and published one time each week in the County of Los Angeles, and which newspaper has
been adjudged a newspaper of general circulation by
the Superior Court of the County of Los Angeles, State
of California, under the date of September 9, 1996, in
Case Number V5005861 that the notice, of which the
annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit:
11/24 and 12/1/17
I certify (or declare) under penalty of perjury that the foregoing is true and correct.

DATED AT CERRITOS, CALIFORNIA,
THIS 1st DAY OF DECEMBER, 2017
Signature
Brian Hews
Los Cerritos Community News
13047 Artesia Blvd. Suite C-102, Cerritos, CA 90703
562-407-3873
LCCN FORM 82180 PROOF
County Clerk’s Filing Stamp

Proof of Publication of
), on or after Firestone Blvd., Norwalk, CA 90650 will sell by competitive bidding by Climer’s Auctions ( Bond # 5181494 of the Commercial Code, Section 535 of the Penal Code. 1812.607, that Norwalk Self Storage at 11564 E. Notice is given that pursuant to sections 21700-21713 of the Business and Professions Code, Section 2328 NOTICE OF SALE OF ABANDONED PROPERTY DECEMBER 12th, 2017 @ 10:00 a.m., property belonging to those listed below. Auction is to be held at the above address. Property to be sold as follows: boxes, totes, fishing poles, bikes, bat, compresNAME cutters belonging to the following. hose, loose wood, picture frames, tent, pillows, loose bedding, gas can, shelving, book cases, basket, and bolt mirror, key boards, globe, couch, duffle bags, ice chest, flat screen TV, tool box, bike parts, suitcase, VCR, loose clothing, dresser, art frame, hangers, night stand, trash bags, chairs, rug cleaner, exercise equipment, sors, cart, trike, 5 gallon buckets, tables, printer, ironing boards, light fixture, speakers, dollie, wood trunk, UNIT #ISMAEL FLORES B605MELITHIA R BUTLER MELISSA ELLIE LARA/EARTHLY JUICES B716 B499
GREGORY RODRIGUEZ B143/B141LORRI CORNEJO B117GLORIA BAKER A253DELIAH H LOPEZ B764/B770This notice is given in accordance with the provisions of Section 21700 et seq. of the Business and ProfesDates: NOVEMBER 24, 2017 and DECEMBER 1, 2017. Sales subject to prior cancellation in the event of settlement between Owner and obligated party. Publication sions Code of the State of California.

Published at Los Cerritos Community Newspaper 11/24 and 12/1/17 Clerk, LCCN
THIS 25th DAY OF March 2024

PROOF OF PUBLICATION
(2015.5 C.C.P.)
Los Cerritos Community Newspaper Group
13017 Artesia Blvd., Suite C-102
Cerritos CA 90703
(562) 407-3873

STATE OF CALIFORNIA,

COUNTY OF LOS ANGELES
I am a citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years,
and not a party to or interested in the above-entitled
matter.

I am the principal clerk of the printer of the Los Cerritos Community News, a newspaper of general circulation, printed and published one time each week in the County of Los Angeles, and which newspaper has
been adjudged a newspaper of general circulation by
the Superior Court of the County of Los Angeles, State
of California, under the date of September 9, 1996, in
Case Number V5005861 that the notice, of which the
annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit:
11/24 and 12/1/17
I certify (or declare) under penalty of perjury that the foregoing is true and correct.

DATED AT CERRITOS, CALIFORNIA,
THIS 1st DAY OF DECEMBER, 2017
Signature
Brian Hews
Los Cerritos Community News
13047 Artesia Blvd. Suite C-102, Cerritos, CA 90703
562-407-3873
LCCN FORM 82180 PROOF
County Clerk’s Filing Stamp
Proof of Publication of
), on or after Firestone Blvd., Norwalk, CA 90650 will sell by competitive bidding by Climer’s Auctions ( Bond # 5181494 of the Commercial Code, Section 535 of the Penal Code. 1812.607, that Norwalk Self Storage at 11564 E. Notice is given that pursuant to sections 21700-21713 of the Business and Professions Code, Section 2328 NOTICE OF SALE OF ABANDONED PROPERTY DECEMBER 12th, 2017 @ 10:00 a.m., property belonging to those listed below. Auction is to be held at the above address. Property to be sold as follows: boxes, totes, fishing poles, bikes, bat, compresNAME cutters belonging to the following. hose, loose wood, picture frames, tent, pillows, loose bedding, gas can, shelving, book cases, basket, and bolt mirror, key boards, globe, couch, duffle bags, ice chest, flat screen TV, tool box, bike parts, suitcase, VCR, loose clothing, dresser, art frame, hangers, night stand, trash bags, chairs, rug cleaner, exercise equipment, sors, cart, trike, 5 gallon buckets, tables, printer, ironing boards, light fixture, speakers, dollie, wood trunk, UNIT #ISMAEL FLORES B605MELITHIA R BUTLER MELISSA ELLIE LARA/EARTHLY JUICES B716 B499
GREGORY RODRIGUEZ B143/B141LORRI CORNEJO B117GLORIA BAKER A253DELIAH H LOPEZ B764/B770Dates: NOVEMBER 24, 2017 and DECEMBER 1, 2017.Sales subject to prior cancellation in the event of settlement between Owner and obligated party. Publication sions Code of the State of California.This notice is given in accordance with the provisions of Section 21700 et seq. of the Business and ProfesPublished at Los Cerritos Community Newspaper 11/24 and 12/1/17 County of Los Angeles
3/22/24
I am the principal clerk of the printer of the
Los Cerritos Community News, a newspaper of
general circulation, printed and published one
time each week in the County of Los Angeles,
City of Cerritos and which newspaper has been
adjudged a newspaper of general circulation
by the Superior Court of the County of Los
Angeles, State of California, under the date of
September 9, 1996, in Case Number V5005861
that the notice, of which the annexed is a printed
copy (set in type not smaller than nonpareil), has
been published in each regular and entire issue
of said newspaper and not in any supplement
thereof on the following dates, to wit:
12 Online at loscerritosnews.net To advertise call 562-407-3873 MARCH 22, 2024

ABC UNIFIED SCHOOL DISTRICT
Request for Qualification
NOTICE IS HEREBY GIVEN that the ABC Unified School District will receive up to but not later than 11:00 AM on the 26th day of April 2024 proposals for:

RFP 1654 Dietetic Consulting Services
All proposals shall be made and presented on a form furnished by the District. Proposals submitted conform to the terms and conditions stated on said form. Contact Esthela Perez (562) 926-5566 x 21218 for a copy of the RFQ. Bids shall be received in the office of the Purchasing Department at 16700 Norwalk Blvd., Cerritos, CA., 90703.

Los Cerritos News March 22, 2024
March 29, 2024
Published at Los Cerritos Community News 3/22 and 3/29/24

PUBLIC NOTICE

CITY OF PICO RIVERA

NOTICE OF PUBLIC HEARING AND PUBLIC COMMENT PERIOD
FISCAL YEAR (FY) 2024-2025 ANNUAL ACTION PLAN
NOTICE IS HEREBY GIVEN that a public hearing will be held before the City of Pico Rivera City Council to receive public comment for the Fiscal Year (FY) 2024-2025 Annual Action Plan. The City is an entitlement community and is expected to receive federal Community Development Block Grant (CDBG) funds from the United States Department of Housing and Urban Development (HUD) for the FY 2024-2025 (July 1, 2024 – June 30, 2025).

WHEN: Tuesday, April 23, 2024
TIME: 6:00 P.M.

WHERE: City Hall Council Chambers
6615 Passons Boulevard
Pico Rivera, CA 90660
As an entitlement jurisdiction, the City is required to prepare and submit to HUD an Annual Action Plan that generally describes how the City will utilize federal money during the next fiscal year to meet the goals and objectives approved by the City Council in the Five-Year Consolidated Plan.

For FY 2024-2025, the City expects to receive approximately $550,000 in CDBG funds. Additionally, the City has an estimated $93,320 in unspent funds available for programming. The total available funds for programming as part of the FY 24-25 Annual Action Plan is approximately $643,320.

Priority Funding for CDBG activities are given to activities that:
• Provide decent affordable housing;
• Maintain and promote neighborhood preservation;
• Affirmatively further fair housing choice for all;
• Provide public services for extremely low, low- and moderate-income residents;
• Construct or upgrade public facilities and infrastructure; and • Planning and administration.

Pursuant to the provisions of the California Environmental Quality Act (CEQA), the proposed Annual Action Plan is exempt under State CEQA Guidelines §15061(b)(3) common sense exemption. It can be seen with certainty that there is no possibility that the Plan would have a significant effect on the environment; therefore, the Plan is exempt from CEQA under the common sense exemption.

PERSONS INTERESTED IN THIS MATTER wishing to observe the meeting may do so in the following ways:
(1) Turn your TV to Channel 3;
(2) Visit the City’s website at https://bit.ly/picorivera-ctv3live; (3) Email public comments to [email protected] prior to 4:00 p.m. on the day of the meeting;
(4) Attend the Public Hearing in person.

Availability of Documents for Public Comment: The City of Pico Rivera encourages citizen participation in the planning process. The 30-day public review period for the FY 2024-2025 Annual Action Plan runs from Friday, March 22, 2024 through Tuesday, April 23, 2024. A copy of the draft Annual Action Plan will be made available for public review on the City of Pico Rivera’s website:
https://www.pico-rivera.org/housing-services-division/. For more information, please contact Eduardo Lizarraga, Analyst, at (562) 801-4420 or via email at [email protected].

If you challenge the consideration or adoption of the proposed Annual Action Plan in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or written correspondence delivered to the City of Pico Rivera City Clerk at, or prior to, the public hearing.

In compliance with the Americans with Disabilities Act of 1990, the City of Pico Rivera is committed to providing reasonable accommodations for a person with a disability. Please contact the Pico Rivera City Clerk’s office at (562) 801-4389 if special program accommodations are necessary and/or if program information is needed in an alternative format. Special requests must be made in a reasonable amount of time in order that accommodations can be arranged.

Published: March 22, 2024
Los Cerritos Community News
Published at Los Cerritos Community News 3/22/24

ABC UNIFIED SCHOOL DISTRICT
played the right way,” he later said.
“Again, it’s trusting the process and
continuing despite maybe having some
bumps in the road, but we still persevered. The system worked and we continued to this day and it’s what we
have right now.”
Artesia (19-3-3), who was ranked
10th in the division, controlled the first
30 minutes of the contest, both in field
possession and shots taken finally leading up to Remigio’s winning kick.

The Artesia girls soccer program
began in the 1996-1997 season and the
next season, it went 11-9-0 but finished
in fourth place in the former Suburban
League. At that time, only the top three
advanced to the playoffs. The Pioneers
finally made their playoff debut during
the 2008-2009 season and finished
10-10-2. After that, the program went
through seven straight winnings season,
advancing to the playoffs each time,
including a quarterfinal appearance in
the 2012-2013 season.

However, the program went the opposite direction after former head coach Octavio Marquez stepped down to take
over the boys soccer program following
the 2015-2016 season. Artesia would go
through four losing seasons and missed
the playoffs four times since then. This
season, the Pioneers posted 17 shutouts,
four by 1-0 scores and all three losses
were by a combined 10-0 score with all
three ties ending scoreless. Two of the
three losses came to league champion
Cerritos High.
“Last year we missed the playoffs,
and we actually had a decent team last
year,” said Umana. “But things didn’t
happen the way [we wanted]. But I
really feel things happen for a reason
because we have a new, revamped group
this year.”
“Since the very beginning, even
coach [Umana] said that he knew there
was something special with this team,”
said Remigio. “I have a lot of trust in
him, and I felt like he was right. Also, I
want to thank all the staff that pushed us
and helped us and also our families who
are always supporting us.”
Artesia from page 1

VETERANS RESOURCE FAIR TO BE

HELD IN WHITTIER THIS WEEKEND
Staff Report
Veterans in Whittier can learn more
about housing, healthcare and more at a
resource fair this weekend.

Whittier’s Veterans Resource Center
is hosting a resource fair on Saturday,
March 23, from 10 a.m. to 1 p.m. at the
Central Library, 7344 Washington Ave.,
in the Community Room.

Information on housing, health care,
education, benefits, jobs and more will
be available. Veterans can discover support networks as well.

Celebrating 10 years of providing
services to the veteran community in
Whittier, the Veterans Resource Center is open Monday through Friday to connect veterans with trained volunteers
who provide information and resources.

For more information, email
[email protected]
or call 562-567-9905.

Enclosure 4
2d
Tuesday, April 9, 2024
A Regular Meeting of the City Council and Water Authority was held in the Council Chamber, Pico Rivera City Hall, 6615 Passons Boulevard, Pico Rivera, California.

Mayor/President Lara called the regular meeting to order at 6:00 p.m. on behalf of the City Council and the Water Authority.

PRESENT: Camacho, Garcia, Lutz, Sanchez, Lara
ABSENT: None
COMMISSIONERS PRESENT:
• Robert Martinez, Planning Commission
• Gil Perez, Veterans Commission
INVOCATION: Delivered by Mayor Lara
PLEDGE OF ALLEGIANCE: Led by Mayor Pro Tem Garcia
SPECIAL PRESENTATION(S):
• Certificates of Recognition were presented to the Pico Rivera Dons Flag Football Gold
• Certificates of Recognition were presented to the Pico Rivera Dons Gremlin Cheer
• Certificates of Recognition were presented to the Pico Rivera Dons Jr. Midget Cheer
PUBLIC COMMENTS:

Lauren Talbott, Pico Rivera Library Manager:
• Addressed the City Council regarding library updates and upcoming events for the month of April.

The following speakers addressed the City Council regarding Tax Fraud Awareness Month related to the tax fraud in the construction industry.

1. Christopher Luna Jr.

2. Emmit Cromwell

3. Gerardo Huerta
The following speakers addressed the City Council requesting a Palestine Ceasefire Resolution.
3 4-9-24.CityCouncilMinutes

Page 2 of 4 ends

1. Lauren 5. Alex Rocha

2. Rodolfo

3. Armando

4. Fernando
Written communication was received by the following:

Michael Wauschek:
• Addressed the City Council regarding ceasefire in Palestine.

Pico-Whittier Alliance for Liberation and Peace:
• Addressed the City Council regarding a proposed resolution relating to ceasefire in Palestine.

CONSENT CALENDAR ITEMS:

City Council:

1. Minutes:
• Approved City Council regular meeting of March 26, 2024

2. Approved 14th Warrant Register of the 2023-2024 Fiscal Year. (700) Check Numbers: 294171-294282; 13430-13497
Special Check Numbers: None

3. Award an Agreement to Helpmates Staffing Services, LLC for Temporary Staffing Services. (500)

1. Awarded an agreement to Helpmates Staffing Services, LLC, for temporary staffing services, as authorized under the City’s piggyback purchasing procurement procedures in an amount not-to-exceed $150,000 per fiscal year from April 9, 2024, through June 30, 2026, with the option for two (2), one (1) – year extensions as stated in the City of Santa Ana Agreement No. A-2023-122-03.

Agreement No. 23-2314

4. Vehicle and Equipment Purchase Authorization. (700)

1. Authorized the transfer of “General Fund Reserves – Assigned” via Account No. 100.98.9800-56900 in the amount of $1,089,702;

2. Appropriated $1,089,702 in the Equipment Replacement Fund as follows; $225,000 to Streets Account No. 170.40.4033-57300, $15,000 to Facilities Account No. 170.40.4031-57300, $225,000 to Parks Account No. 170.40.4032-57300 and $624,702 to Fleet Account No. 170.40.4033- 57300 for vehicle and equipment purchases;
4-9-24.CityCouncilMinutes

Page 3 of 4 ends

3. Appropriated $150,000 in Equipment Replacement Fund No. 40.4033- 57300 received from the proceeds from sales of vehicles and equipment; and

4. Authorized the City Manager to execute all documents related to the purchase of the recommended vehicles and equipment.

5. Senior Center Restrooms ADA Improvement Project (CIP No. 50036) – Notice of Completion. (500)

1. Accepted the work as completed for the Senior Center Restrooms ADA Improvement Project, (CIP No. 50036) constructed by Global Builders, Inc. and authorized the City Clerk to file the Notice of Completion with the Los Angeles County Register-Recorder;

2. Authorized the City Manager or designee to release the retention payment to Global Builders, Inc. following the mandatory waiting period from the date the Notice of Completion is recorded; and

3. Appropriated the unused balance of approximately $42,703 from the fiscal year (FY) 2022-23 Senior Center ADA Restroom Improvement Project (CIP No. 50036) to the Teen Center Renovation Project (CIP No. 50100).

Water Authority:

6. Minutes:
• Approved the Water Authority regular meeting of March 12, 2024

7. Approved Purchase of a Case 590SN Tractor Loader Backhoe from Sonsray Machinery, LLC. (700)

1. Approved the purchase of a 590SN Tractor Loader Backhoe Case Heavy Equipment from Sonsray Machinery, LLC utilizing Cooperative Agreement Contract No. 011723-CNH through Sourcewell in the amount of $186,00 and authorized the Executive Director to execute all documents related to the purchase of the equipment.

Motion by Councilmember/Commissioner Lutz, seconded by
Councilmember/Commissioner Dr. Sanchez to approve Consent Calendar Item Nos. 1 through 7. Motion carries by the following roll call vote:

AYES: Camacho, Garcia, Lutz, Sanchez, Lara
NOES: None
CONSENT CALENDAR ITEMS PULLED FOR FURTHER CLARIFICATION: None REGULAR AGENDA: None
CITY MANAGER/STAFF REPORTS: None
4-9-24.CityCouncilMinutes

Page 4 of 4 ends

GOOD OF THE ORDER (INTERGOVERNMENTAL AGENCY MEETINGS, AB 1234 REPORTS, NEW BUSINESS, OLD BUSINESS):

Councilmember Lutz commented on the Nasa Services annual 2024 Spring Bulky Item collection week and the commencement of the Pico Rivera Farmers Market at Pico Park.

Councilmember Dr. Sanchez commented on her attendance at the Pico Boys Baseball Opening Day Ceremony and the El Rancho High School Girls Softball game.

Councilmember Camacho reported on his attendance at the California Contract Cities Advocacy Day.

Mayor Pro Tem Garcia congratulated Pico Boys Baseball for their recent Opening Day Ceremony and requested the establishment of an ad hoc committee related to traffic calming measures and parking; seconded by Councilmember Camacho.

Mayor Lara commented on the Pico Boys Baseball Opening Day ceremony, the relocation of the Farmers Market to Pico Park, and a meeting with the District Attorney regarding unprosecuted cases.

ADJOURNMENT:

Mayor/President Lara adjourned the City Council and Water Authority meeting at 6:49 p.m. There being no objection it was so ordered.

AYES: Camacho, Garcia, Lutz, Sanchez, Lara
NOES: None

_____________________________________
Andrew C. Lara, Mayor/President
ATTEST:
_______________________________
Cynthia Ayala, CMC, City Clerk/Authority Secretary
I hereby certify that the foregoing is a true and correct report of the proceedings of the City Council regular meeting dated April 9, 2024 and approved by the City Council on April 23, 2024.
________________________________
Cynthia Ayala, CMC, City Clerk/Authority Secretary
MEETING DATE: 04/23/2024

CHECK DATE STARTING ENDING AMOUNT
CHECK NUMBERS: 03/29/24-04/11/24 294283 294386 $849,545.19 ACH NUMBERS: 03/29/24-04/11/24 13498 13557 $892,157.14

PRE-NOTE
TOTAL REGISTER AMOUNT: $ 1,741,702.33
15th WARRANT REGISTER OF THE 2023 - 2024 FISCAL YEAR

SPECIAL CHECKS/EFT

VOIDED CHECKS
4 Number Date Description
Transaction
Amount
294283 04/03/2024 $819.13
Invoice Amount
8810406635332 $115.30
8810407128962 $506.93
8810407135519 $196.90
294284 04/03/2024 $2,999.97
Invoice Amount
14559 $2,999.97
294285 04/03/2024 $121.00
Invoice Amount
IS709166 $121.00
294286 04/03/2024 $10,235.00
Invoice Amount
2024APRATTYFEES $10,235.00
294287 04/03/2024 04/05/2024 Accounts Payable C.S. Legacy Construction, Inc. $4,848.00 Accounts Payable Alvarez-Glasman & Colvin
Description
CITY ATTORNEY RETAINER FEE APRIL 2024
Accounts Payable ALTA LANGUAGE SERVICES, INC.

Description

WRITING TEST (ONLINE)/LISTENING & SPEAKING TEST (IVR)
Accounts Payable Alan's Lawnmower & Garden Center
Description

SMALL TOOLS & EQUIPMENT

MECHANIC SHOP SUPPLIES

MECHANIC SHOP SUPPLIES

MECHANIC SHOP SUPPLIES
CBC GenOpe - CBC General Operating
Check
Accounts Payable ADVANCE AUTO PARTS
Description
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
user: Georgina Ortiz Pages: 1 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
PROGRESS PMT 15 $4,848.00
294288 04/03/2024 04/10/2024 $15,574.65
Invoice Amount
24-427 $15,574.65
294289 04/03/2024 $4,000.00
Invoice Amount
LAP-02336 $4,000.00
294290 04/03/2024 04/09/2024 $1,946.38
Invoice Amount
107631 $1,946.38
294291 04/03/2024 04/09/2024 $2,217.88
Invoice Amount
107630 $2,217.88
294292 04/03/2024 $8,955.00
Invoice Amount
Accounts Payable CliftonLarsonAllen LLP
Description
Accounts Payable CivicWell
Description
WHITTIER BL CALTRANS GRANT JANUARY 2024
Accounts Payable CivicWell
Description
WHITTIER BL SPECIFIC PLAN JANUARY 2024
Accounts Payable City of Vernon
Description
SEWC MEMBERSHIP DUES 23/24
Accounts Payable CATALINA TOURS
Description
CATALINA EXCURSION ON 04/27/24
Description
RELEASE OF STOP PAYMENT NOTICE W/HELD UNDER PAY APP NO.6 user: Georgina Ortiz Pages: 2 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
L241154930 $8,955.00
294293 04/03/2024 $31,090.50
Invoice Amount
2754777 $31,090.50
294294 04/03/2024 $90.00
Invoice Amount
LAC9031054 $90.00
294295 04/03/2024 $418.53
Invoice Amount
RE-PW23081400826 $418.53
294296 04/03/2024 04/09/2024 $359.88
Invoice Amount
RE-PW23081400442 $359.88
294297 04/03/2024 04/10/2024 $13,139.00
Invoice Amount
SI-1298701 $13,139.00
Accounts Payable CPACINC.COM
Description
1 Year Maraki renewal - License & Support
Accounts Payable County of Los Angeles Dept of Public Works Description
KITS MONITORING THROUGH JUNE 2023
Accounts Payable County of Los Angeles Dept of Public Works Description

TRAFFIC SIGNAL MAINTENANCE ROSE HILLS & SAN GABRIEL
Accounts Payable Coastal Occupational Medical Group
Description

PRE-EMPLOYMENT PHYSICALS
Accounts Payable CLUB CAR, LLC
Description
PURCHASED 12 GOLF COURSE CARTS
FY 23-24 Annual Audit Services
user: Georgina Ortiz Pages: 3 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294298 04/03/2024 04/09/2024 $2,806.45
Invoice Amount
CV4038184 $2,806.45
294299 04/03/2024 04/09/2024 $355.00
Invoice Amount
10301 $355.00
294300 04/03/2024 04/09/2024 $43,252.50
Invoice Amount
202401620 $43,252.50
294301 04/03/2024 04/10/2024 $250.00
Invoice Amount
396573 $250.00
294302 04/03/2024 $1,160.37
Invoice Amount
3422971 $1,160.37
Accounts Payable Ferguson Enterprises, Inc
Description

PLUMBING SUPPLIES
Accounts Payable Empower Trust Company, LLC
Description
QUARTERLY INVESTMENT ACCESS FEE 12/16/23-3/15/24
Accounts Payable Dudek
Description
PROF SVCS THROUGH 01/27/24-02/23/24, COMMUNITY CITYWIDE Accounts Payable Donnoe & Associates, Inc.

Description
ACCOUNTANT III EXAM AND TEST BOOK RENTAL 02/01/24-02/15/24 Accounts Payable CW PRODUCTS INC DBA ANYPROMO.COM
Description

TOTE/BACKPACKS FOR OUTDOOR EQUITY PROGRAMS
user: Georgina Ortiz Pages: 4 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294303 04/03/2024 04/10/2024 $157.72
Invoice Amount
9060539815 $33.40
9067476086 $124.32
294304 04/03/2024 04/10/2024 $57.00
Invoice Amount
842857 $57.00
294305 04/03/2024 04/10/2024 $1,338.31
Invoice Amount
61385 $1,338.31
294306 04/03/2024 $20.00
Invoice Amount
842840 $20.00
294307 04/03/2024 04/09/2024 $5,246.98
Invoice Amount
241847EC HELICOPTER SVC NOVEMBER 2023 $5,246.98

REFUND ON CANCELED DJ PARTY AT SENIOR CENTER
Accounts Payable LA County Sheriffs Department
Description
BUS TRANSPORATION FOR PANTAGES THEATER ON 03/23/24
Accounts Payable INSUASTI, GUILLERMO
Description
REFUND FOR CANCELLED WINE TASTING 04/20/24
Accounts Payable Inland Empire Stages, LTD
Description

SMALL TOOLS
Accounts Payable HERNANDEZ, JOSE, BASILIO
Description
Accounts Payable Grainger
Description

MAINTENANCE SUPPLIES
user: Georgina Ortiz Pages: 5 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294308 04/03/2024 $1,387.94
Invoice Amount
16284009 $1,387.94
294309 04/03/2024 $1,924.50
Invoice Amount
262583 $358.50
262596 $696.00
261836 $870.00
294310 04/03/2024 04/10/2024 $580.96
Invoice Amount
71707 $445.80
71706 $135.16
294311 04/03/2024 04/09/2024 $10,000.00
Invoice Amount
2023-1588 $10,000.00
294312 04/03/2024 04/09/2024 $58,480.57
Invoice Amount
REFUND FOR WASTE MANAGEMENT DEPOSIT 9257 SLAUSON AVE #2023- 1588
Accounts Payable Moore Iacofano & Goltsman Inc
Description
WEEKLY ENROLLMENT NOTICES OON1 & OON2
Accounts Payable MLP Properties
Description
Accounts Payable Minuteman Press
Description
WEEKLY OON1 & OON2 POSTCARDS
PROF SVCS THROUGH 02/29/24, PERSONNEL RULES REVIEW AND REVISION PROF SVCS THROUGH 02/29/24, REVIEW OF MOUs-2023/2024
PROF SVCS THROUGH 02/29/24, GENERAL
Lease of Konica Minolta C4070 Copier FY 23-24
Accounts Payable Liebert Cassidy Whitmore
Description
Accounts Payable LEAF CAPITAL FUNDING LLC
Description
user: Georgina Ortiz Pages: 6 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
0083524 $44,737.12
0085395 $13,743.45
294313 04/03/2024 $230.04
Invoice Amount
211897 ($1,969.12)
211948 $265.17
222259 $589.52
222502 $40.69
223679 $273.64
274376 $161.37
274550 $868.77
294314 04/03/2024 04/08/2024 $5,245.00
Invoice Amount
0245724 $3,575.00
0245524 $1,670.00
294315 04/03/2024 $1,700.00
Invoice Amount
04122024ADEPEI $500.00
Accounts Payable Passage Entertainment
Description
DJ SVCS FOR ADAPTIVE DANCE ON 04/12/2024
Description
PRV ASSESSMENT THROUGH FEBRUARY 2024

CLEARANCE AIR MONITORING AND REPORT DEVELOPMENT

MECHANIC SHOP SUPPLIES

MECHANIC SHOP SUPPLIES
Accounts Payable OMEGA ENVIRONMENTAL SERVICES, INC.

MECHANIC SHOP SUPPLIES

MECHANIC SHOP SUPPLIES

MECHANIC SHOP SUPPLIES
Description

CREDIT TO ACCOUNT

MECHANIC SHOP SUPPLIES
PROF SVCS 09/01/23-09/30/23, HISTORIC WHITTIER BLVD MULTI-MODAL PROF SVCS 02/01/24-02/29/24, HISTORIC WHITTIER BLVD MULTI Accounts Payable Napa Auto Parts
user: Georgina Ortiz Pages: 7 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
03232024PRPEI $1,200.00
294316 04/03/2024 04/09/2024 $1,020.74
Invoice Amount
7518 $193.87
7548 $826.87
294317 04/03/2024 04/08/2024 $5,000.00
Invoice Amount
24-003 $5,000.00
294318 04/03/2024 04/10/2024 $521.02
Invoice Amount
Q1261623 $521.02
294319 04/03/2024 $60.00
Invoice Amount
823032-A $60.00
294320 04/03/2024 04/08/2024 $177,995.50
Invoice Description Amount
Description
GO GETTERS PROGRAM CANCELED DUE TO COVID-19 REISSUED
Accounts Payable RHA LANDSCAPE ARCHITECTS-PLANNERS,
INC.

Description
LEASE AND TAX 01/25/24-04/24/24
Accounts Payable REYNOSO, HENRY
Description
LAW ENFORCEMENT SVCS MARCH 2024
Accounts Payable Quadient Leasing USA, Inc.

FIRE EXTINGUISHER SVCS RIO VISTA PARK

FIRE EXTINGUISHER SVCS PICO PARK
Accounts Payable PM Law Enforcement Services, LLC
EASTER EVENT SOUND FOR STAGE 03/23/24
Accounts Payable Phil's Fire Extinguisher Co.

Description
user: Georgina Ortiz Pages: 8 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
102553 $89,106.50
1123059 $39,520.00
1123062 $49,369.00
294321 04/03/2024 $600.00
Invoice Amount
2024-113 $600.00
294322 04/03/2024 $10.00
Invoice Amount
842844 $10.00
294323 04/03/2024 04/09/2024 $40.00
Invoice Amount
3191-2024 $20.00
3153 $20.00
294324 04/03/2024 $25,488.00
Invoice Amount
20240339 $25,488.00
Description
CITY BRAND SIGNAGE & FURNITURE MASTER PLAN, FEBRUARY 2024 TIRE REPAIR FOR UNIT 249
TIRE REPAIR FOR UNIT 454
Accounts Payable SELBERT PERKINS DESIGN, INC.

REFUND FOR DJ PARTY AT SENIOR CENTER
Accounts Payable Salgado Tire Service
Description
2024 PLAYPASS VOUCHERS
Accounts Payable ROSALES, CLARA
Description
PROF SVCS 10/26/23-11/25/23, 23109 RIO HONDO PARK
Accounts Payable Rivera Baseball Association Inc
Description
PROF SVCS 09/26/23-10/25/23, 23109 RIO HONDO PARK
PROF SVCS 10/26/23-11/25/23, 23126 ALEBRIJI DOG PARK
user: Georgina Ortiz Pages: 9 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294325 04/03/2024 $1,505.40
Invoice Amount
SUNRUNREFUND2023 $1,505.40
294326 04/03/2024 04/08/2024 $120.00
Invoice Amount
145278 $120.00
294327 04/03/2024 04/09/2024 $165.32
Invoice Amount
21053 $165.32
294328 04/03/2024 04/10/2024 $288.00
Invoice Amount
20242028 $288.00
294329 04/03/2024 $346.93
Invoice Amount
2190141758 $346.93
294330 04/03/2024 04/09/2024 $8,410.79
Description

UNIFORM RENTAL SVCS
Accounts Payable United Waterworks, Inc
Description
PROF SVCS THROUGH 02/29/24, PR CITY ENGINEERING SERVICES Accounts Payable UNIFIRST CORPORATION
Description

FLAGS FOR FACILITIES
Accounts Payable Transtech Engineers, Inc
Description

ACTING WORKSHOP SCENE STUDY
Accounts Payable The Flag Shop
Description
REFUND FOR CANCELLED PV SOLAR PERMITS 2023-1734
Accounts Payable TAMEZ, VICTORIA, ANN
Accounts Payable SUNRUN INSTALLATION SERVICES, INC.
user: Georgina Ortiz Pages: 10 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
S100129132.001 $7,691.26
S100129136.001 $592.76
S100129342.001 $126.77
294331 04/03/2024 04/09/2024 $2,496.00
Invoice Amount
409116 $299.88
409126 $1,596.36
409132 $599.76
294332 04/10/2024 $401.24
Invoice Amount
22138 $401.24
294333 04/10/2024 $113.11
Invoice Amount
8810407329055 $113.11
294334 04/10/2024 $156.00
Invoice Amount
Accounts Payable AM-TEC TOTAL SECURITY INC
Description
Accounts Payable ADVANCE AUTO PARTS
Description

MECHANIC SHOP SUPPLIES
Accounts Payable A & G SALES
Description

ITEMS FOR FENCE REPAIR AT GOLF COURSE

PLAYGROUND CHIPS

LANDSCAPING SUPPLIES

PLAYGROUND CHIPS

MAINTENANCE SUPPLIES
Accounts Payable Whittier Fertilizer Company
Description
Description

MAINTENANCE SUPPLIES

MAINTENANCE SUPPLIES
user: Georgina Ortiz Pages: 11 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
633563 $156.00
294335 04/10/2024 $104.20
Invoice Amount
240406025101 $104.20
294336 04/10/2024 $3,969.00
Invoice Amount
7098-45009 $3,969.00
294337 04/10/2024 $32,763.75
Invoice Amount
10689 $32,763.75
294338 04/10/2024 $5,828.88
Invoice Amount
RIV-DEC23 $2,432.02
RIV-FEB24 $1,311.23
RIV-JAN24 $2,085.63
294339 04/10/2024 $2,782.69
UTILITIES FOR JANUARY 2024
UTILITIES FOR DECEMBER 2023
Accounts Payable CINTAS CORP.

Accounts Payable Central Basin Municipal Water District Description
UTILITIES FOR NOVEMBER 2023
Accounts Payable CASCADIA CONSULTING SERVICES
Description
PROFESSIONAL SVCS 1/26/24-2/25/24, PR CAP2023
Accounts Payable C & O Manufacturing
Description
Custom Lids for catch basins
Accounts Payable Ansafone Contact Center, Labell Exchange & BTE Com
Description
AFTER HOURS ANSWERING SVC MARCH 2024, WATER DEPT.

CAMERA REPAIR, RIO HONDO PARK
user: Georgina Ortiz Pages: 12 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
8406753041 $218.30
8406753236 $1,019.70
8406753039 $1,309.79
840675 $234.90
294340 04/10/2024 $3,208.19
Invoice Amount
12647 $3,208.19
294341 04/10/2024 $2,938.30
Invoice Amount
IN7102804978 $2,938.30
294342 04/10/2024 $42,586.25
Invoice Amount
W9Y31500-08 $42,586.25
294343 04/10/2024 $586.96
Invoice Amount
16314018 $586.96
Description
1 MBM 352F PLOTTER & TRIUMPH 5225
Description
PROF SVCS 05/27/23-12/31/23, PFAS TREATMENT SYSTEMS PROJECT Accounts Payable LEAF CAPITAL FUNDING LLC
Description
TELECOMMUNICATIONS SERVICES VOIP, APRIL 2024
Accounts Payable Jacobs Engineering Group Inc
Description
LIGHT BAR INSTALLATION, UNIT 125
Accounts Payable GoTo Communications, Inc.

REPLENISH AND SERVICE FIRST AID KITS AND AED

REPLENISH AND SERVICE FIRST AID KITS AND AED GOLF COURSE Accounts Payable EMERGENCY VEHICLE SPECIALTIES, EVS INC.

Description

REPLENISH AND SERVICE FIRST AID KITS AND AED

REPLENISH AND SERVICE FIRST AID KITS AND AED
user: Georgina Ortiz Pages: 13 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294344 04/10/2024 $1,851.71
Invoice Amount
5841848 $1,851.71
294345 04/10/2024 $14,298.00
Invoice Amount
INV-000934 $14,298.00
294346 04/10/2024 $66.00
Invoice Amount
NHMFIETRIP0424 $66.00
294347 04/10/2024 $131.26
Invoice Amount
71943 $131.26
294348 04/10/2024 $372.26
Invoice Amount
211858 $372.26
Description

MECHANIC SHOP SUPPLIES
Description
WEEKLY OON1 & OON2 ENROLLMENT NOTICES.

Accounts Payable Napa Auto Parts
Description
REACH FIELD TRIP PARKING PASS, 04/17/24 TO NATURAL HISTORY Accounts Payable Minuteman Press
Description
PROF SVCS THROUGH 03/20/24, AMI PROJECT
Accounts Payable MILLAN (EE), IVAN
Description
Rain Gear & Safety supplies for field staff
Accounts Payable MeterSYS
Accounts Payable MALLORY SAFETY & SUPPLY LLC
user: Georgina Ortiz Pages: 14 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294349 04/10/2024 $6,345.00
Invoice Amount
362144 $2,775.00
362143 $170.00
362138 $45.00
362137 $1,035.00
362136 $1,735.00
371483 $585.00
294350 04/10/2024 $400.00
Invoice Amount
04132024SCPE $400.00
294351 04/10/2024 $42.07
Invoice Amount
2024PETCASRE0324 $42.07
294352 04/10/2024 $6,787.25
Invoice Amount
7513 FIRE EXTINGUISHER SVCS PICO PARK $6,787.25
REPLENISH PETTY CASH FOR MARCH 2024
Accounts Payable Phil's Fire Extinguisher Co.

Description
DJ SERVICES FOR DADDY/DAUGHTER EVENT 04/13/24
Accounts Payable PETTY CASH
Description
PROFESSIONAL SVCS 11/29/23-12/31/23, 9036 BEVERLY BL-TPM Accounts Payable Passage Entertainment
Description
PROF SVCS 10/01/23-10/31/23, GALLATIN WATER EASEMENT
PROF SVCS 09/26/23-10/31/23, PARCEL MAP 83251, FINAL PARCEL MAP PROF SVCS 09/26/23-10/31/23, 10016 BEVERLY BLVD WAREHOUSE Description
PROF SVCS 10/26/23-11/07/23, 8345 SLAUSON AVE-GRADING
PROF SVCS 10/01/23-10/31/23, 7655 SERAPIS AVENUE
Accounts Payable NV5, Inc.
user: Georgina Ortiz Pages: 15 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294353 04/10/2024 $10,000.00
Invoice Amount
20240077 $10,000.00
294354 04/10/2024 $10,998.99
Invoice Amount
2024FEB-PICOWD-A $4,706.16
2024FEB-PICOWD-B $6,259.77
2024FEB-PICOWD-C $33.06
294355 04/10/2024 $266.53
Invoice Amount
19760 $266.53
294356 04/10/2024 $97,258.44
Invoice Amount
RETENTION-204863 $97,258.44
294357 04/10/2024 $340.00
Invoice Amount
3291 $120.00
Accounts Payable Salgado Tire Service
Description
TIRE MOUNT FOR UNIT 288
Accounts Payable Ruiz Engineering and All American Asphalt Description

RELEASE RETENTION-CITYWIDE RESURFACING
Accounts Payable Roadline Products Inc., USA
Description
Paint for street painting/markings
UTILITIES FOR FEBRUARY 2024
UTILITIES FOR FEBRUARY 2024
UTILITIES FOR FEBRUARY 2024
QUARTERLY INVESTMENT FOR JANUARY THROUGH MARCH 2024
Accounts Payable Pico Water District
Description
Accounts Payable PICO RIVERA CHAMBER OF COMMERCE
Description
user: Georgina Ortiz Pages: 16 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
3292 $220.00
294358 04/10/2024 $5,401.89
Invoice Amount
INV14121693 $3,167.51
INV14124393 $2,234.38
294359 04/10/2024 $3,588.74
Invoice Amount
PSO118776-1 $2,305.67
PSO119266-1 $1,283.07
294360 04/10/2024 $175.00
Invoice Amount
RG 3610171 $175.00
294361 04/10/2024 $420.00
Invoice Amount
ZRCS81321 $420.00
294362 04/10/2024 Accounts Payable TKM ENGINEERING $1,560.00 Accounts Payable The Nelrod Company
Description

HOUSING RENTAL MARKET COMPARABLES UPDATE
Accounts Payable Swank Motion Pictures Inc
Description

SENIOR CENTER MOVIE LICENSE FEE, PRISCILLA
Description

EQUIPMENT MAINTENANCE SUPPLIES

EQUIPMENT MAINTENANCE SUPPLIES

STORAGE CONTAINER FOR YOUTH CENTER

YOUTH CENTER FURNITURE
Accounts Payable Sonsray Machinery , LLC
TIRE MOUNT FOR BOBCAT UNIT 340
Accounts Payable School Outfitters LLC
Description
user: Georgina Ortiz Pages: 17 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
1270 $1,560.00
294363 04/10/2024 $3,278.94
Invoice Amount
12060 $3,278.94
294364 04/10/2024 $1,818.00
Invoice Amount
CINV-034758 $1,818.00
294365 04/10/2024 $115,381.53
Invoice Amount
PROGRESS PMT 1 $48,049.50
PROGRESS PMT 1-A ($2,402.48)
PROGRESS PMT 1-1 $73,404.75
PROGRESS PMT1-1A ($3,670.24)
294366 04/10/2024 $2,426.93
Invoice Amount
3641601 $2,426.93
Accounts Payable VALIN CORPORATION
Description

RAIN DIVERTER VALVE FOR SPORTS ARENA

ROSEMEAD BLVD MEDIAN AND PARKWAY BEAUTIFIACTION

MAJOR CORRIDORS MEDIAN AND PARKWAY BEAUTIFIACTION

MAJOR CORRIDORS MEDIAN AND PARKWAY BEAUTIFIACTION
Accounts Payable URBAN HABITAT
Description
Rosemead Blvd Median and Parkway Beautification Project Accounts Payable TRUSAIC
Description
2024 ACA APRIL PAYMENT
Accounts Payable Tripepi, Smith and Associates, Inc.

Description
PROFESSIONAL SVCS, PR INNOVATIVE MUNICIPAL ENERGY 3/4/24-3/27/24 Description
PROF SVCS 02/06/24-02/20/24, ITS MASTER PLAN CIP 50052
user: Georgina Ortiz Pages: 18 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294367 04/10/2024 $10,839.00
Invoice Amount
202403-24008 $10,839.00
294368 04/11/2024 $17.14
294369 04/11/2024 $6.49
294370 04/11/2024 $55.66
294371 04/11/2024 $4.07
294372 04/11/2024 $8.88
294373 04/11/2024 $95.72
294374 04/11/2024 $11.05
294375 04/11/2024 $108.04
294376 04/11/2024 $101.82
294377 04/11/2024 $52.28
294378 04/11/2024 $47.61
294379 04/11/2024 $100.29
294380 04/11/2024 $397.71
Invoice Amount
041124 $397.71
Accounts Payable BMG Money, Inc
Description
EMPLOYEE DEDUCTION FOR P/E 04/05/24
Utility Management Refund TREJO, JOE
Utility Management Refund YSN IMPORTS INC
Utility Management Refund ZENG, JUN
Utility Management Refund RAMIREZ, ROSA
Utility Management Refund RE CAPITAL PARTNERS
Utility Management Refund RODRIGUEZ, ARTHUR
Utility Management Refund PEARSON, BRANDY
Utility Management Refund PINEDO, PATRICIA
Utility Management Refund RAMIREZ, ANDREW
Utility Management Refund BARAHONA, SYLVIA
Utility Management Refund GONZALES, MARIA
Utility Management Refund OPENDOOR LABS INC.

Accounts Payable Yao Engineering, Inc.

Description
PROF SVCS 03/01/24-03/31/24, PLAN AND SPEC REVIEW FOR AQUATIC user: Georgina Ortiz Pages: 19 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
294381 04/11/2024 $50.00
Invoice Amount
041124 $50.00
294382 04/11/2024 $500.00
Invoice Amount
041124 $500.00
294383 04/11/2024 $347.23
Invoice Amount
040124 $347.23
294384 04/11/2024 $107.00
Invoice Amount
041124 $107.00
294385 04/11/2024 $2,781.22
Invoice Amount
040124 $2,781.22
294386 04/11/2024 Accounts Payable Western Dental Services, Inc. $190.91 Accounts Payable Standard Insurance Company
Description
VISION SERVICES FOR APRIL 2024
Accounts Payable SEIU Local 721-COPE
Description
COPE FEES FOR P/E 04/05/24
Accounts Payable NUFIC
Description
SUPPLEMENTAL LIFE INSURANCE FOR APRIL 2024
Accounts Payable Levying Officer
Description
EMPLOYEE DEDUCTION FOR P/E 04/05/24
Accounts Payable Franchise Tax Board
Description
EMPLOYEE DEDUCTION FOR P/E 04/05/24
user: Georgina Ortiz Pages: 20 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
326625 $190.91
$849,545.19
13498 04/03/2024 $121.10
Invoice Amount
9147868315 $121.10
13499 04/03/2024 $60.00
Invoice Amount
SPNGWK1'24 $60.00
13500 04/03/2024 $90.35
Invoice Amount
849703 $90.35
13501 04/03/2024 $2,507.93
Invoice Amount
82255540 $2,507.93
CBC GenOpe - CBC General Operating
CITYWIDE COPIERS LEASE 4/1/24-4/30/24
EFT
Accounts Payable Airgas USA, LLC
Description
DE LAGE LANDEN FINANCIAL SERVICES, INC.

Comlock Security Group
Bland, Renee

NEW KEYS FOR SUPERVISORS
Accounts Payable
Description
OFFICIATING SVCS 03/21/24
Accounts Payable
Description

MAINTENANCE SUPPLIES
Accounts Payable
Description
Type Check Totals:

Description
DENTAL SERVICES (DHMO) FOR APRIL 2024
user: Georgina Ortiz Pages: 21 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13502 04/03/2024 $120.00
Invoice Amount
30327 $120.00
13503 04/03/2024 $1,291.95
Invoice Amount
36500 $1,291.95
13504 04/03/2024 $1,099.50
Invoice Amount
791840622 $640.44
794285536 $459.06
13505 04/03/2024 $145.52
Invoice Amount
464399 $18.19
464400 $18.19
464401 $36.38
464531 $18.19
464691 $18.19

MAINTENANCE AND TONER EQUIPMENT SENIOR CENTER

MAINTENANCE AND TONER EQUIPMENT SENIOR CENTER
Description

MAINTENANCE AND TONER EQUIPMENT CED

MAINTENANCE AND TONER EQUIPMENT

JANITORIAL SUPPLIES

JANITORIAL SUPPLIES
Accounts Payable I Copy, Inc (ibe digital)
Description
MAINTENANCE AND REPAIR OF UNIT 120
Accounts Payable Eastern County Newspaper Group, Inc.

Description
Accounts Payable
Description
Maintenance & Operations of Konica Minolta Copier
Home Depot

DIEGO'S AUTO REPAIR

BIDS INVITE NOTICE, PR PREFABRICATED RESTROOM PROJECT
Accounts Payable
user: Georgina Ortiz Pages: 22 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
465329 $18.19
465349 $18.19
13506 04/03/2024 $875.00
Invoice Amount
PR1UOR12312 $875.00
13507 04/03/2024 $60.00
Invoice Amount
SPNGWK2'24 $60.00
13508 04/03/2024 $304,375.67
Invoice Amount
2024APRRBBISHFEE $304,375.67
13509 04/03/2024 $2,340.00
Invoice Amount
145329-145337 $2,340.00
13510 04/03/2024 $782.83
Invoice Description Amount
Description
INSTRUCTOR FOR TIKI TAKA SOCCER, 03/05/24-03/28/24
Accounts Payable Shoeteria, Inc.

Description
RUBBISH ASSESSMENT FOR APRIL 2024
Accounts Payable Serrano, Leon
Description
OFFICIATING SVCS 03/28/24
Accounts Payable NASA Services Inc
Description
UOR AND BCR PROGRAM SVCS DECEMBER 2023
Accounts Payable Martinez, Ben

MAINTENANCE AND TONER EQUIPMENT HOUSING

MAINTENANCE AND TONER EQUIPMENT FINANCE
Accounts Payable John L Hunter & Associates Inc.
user: Georgina Ortiz Pages: 23 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
0063978-IN $200.00
0064011-IN $193.48
0064024-IN $189.50
0064249-IN $199.85
13511 04/03/2024 $630.00
Invoice Amount
145272 $630.00
13512 04/03/2024 $1,140.48
Invoice Amount
69481 $1,140.48
13513 04/03/2024 $1,776.46
Invoice Amount
4891-2 $85.27
4962-1 $43.61
5162-7 $1,545.98
9830-5 $101.60
13514 04/03/2024 $728.22

PAINT FOR GRAFFITI ABATEMENT

PAINT FOR GRAFFITI ABATEMENT
Accounts Payable Vulcan Materials Co.

Description

PAINT FOR GRAFFITI ABATEMENT

PAINT FOR GRAFFITI ABATEMENT
Description
STREET LIGHT MAINTENANCE AND REPAIR MARCH 2024
Accounts Payable The Sherwin-Williams Co.

Description
INSTRUCTOR FOR ZUMBA 03/05/24-03/28/24
Accounts Payable Tanko Streetlighting, Inc

SAFETY SHOES FOR JAVIER GARCIA

SAFETY SHOES FOR ALBERT RAMIREZ
Accounts Payable Silva, Luz

SAFETY SHOES FOR FRANCISCO SIGALA

SAFETY SHOES FOR ROBERT SETTERS
user: Georgina Ortiz Pages: 24 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
73944965 $223.42
73947886 $280.30
73950000 $224.50
13515 04/03/2024 $1,196.43
Invoice Amount
82358670 $269.50
82361084 $840.14
82369385 $86.79
13516 04/01/2024 $330.90
Invoice Amount
Import - 13327 $330.90
13517 04/01/2024 $28,512.80
Invoice Amount
Import - 13328 $28,512.80
13518 04/02/2024 $379.98
Invoice Amount
Accounts Payable Frontier California
Description
Accounts Payable So Calif Edison Company
Description
ELECTRIC SVC-4332 1/2 SAN GABRIEL RIVER
Accounts Payable So Calif Gas Company
Description
GAS SVC-9633 BEVERLY

JANITORIAL SUPPLIES FOR PARKS

JANITORIAL SUPPLIES FOR PARKS

JANITORIAL SUPPLIES FOR PARKS

ASPHALT MAINTENANCE
Accounts Payable Waxie Sanitary Supply
Description
Description

ASPHALT MAINTENANCE

ASPHALT MAINTENANCE
user: Georgina Ortiz Pages: 25 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Import - 13329 $379.98
13519 04/02/2024 $11,998.09
Invoice Amount
Import - 13333 $11,998.09
13520 03/06/2024 03/31/2024 ($60.99)
Invoice Amount
03/06/24 ($60.99)
13521 04/04/2024 $2,909.28
Invoice Amount
Import - 13336 $2,909.28
13522 04/04/2024 $805.07
Invoice Amount
Import - 13337 $805.07
13523 04/05/2024 $201.76
Invoice Amount
Import - 13338 $201.76
Accounts Payable Frontier California
Description
Radio & Telecommunication
Accounts Payable Verizon Wireless
Description

RADIO & TELECOMMUNICATION
Accounts Payable So Calif Gas Company
Description
GAS SVC-9025 MINES
Accounts Payable Frontier California
Description
CREDIT RECEIVED FROM FRONTIER W/O 03/06/24
Accounts Payable City of Pico Rivera
Description

WATER SVC
Radio & Telecommunication
user: Georgina Ortiz Pages: 26 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13524 04/05/2024 $35,582.82
Invoice Amount
Import - 13339 $35,582.82
13525 04/05/2024 $906.02
Invoice Amount
Import - 13340 $906.02
13526 04/08/2024 $61.12
Invoice Amount
Import - 13341 $61.12
13527 04/03/2024 $52.99
Invoice Amount
Import - 13334 $52.99
13528 04/03/2024 $4,476.90
Invoice Amount
Import - 13335 $4,476.90
Accounts Payable So Calif Edison Company
Description
ELECTRIC SVC-4632 ORANGE
Accounts Payable Time Warner Cable
Description

RADIO & TELECOMMINICATION
Accounts Payable Frontier California
Description
Radio & Telecommunication
Accounts Payable Time Warner Cable
Description

RADIO & TELECOMMINICATION
Accounts Payable So Calif Edison Company
Description

ELECTRIC SVC-VARIOUS LOCATIONS
user: Georgina Ortiz Pages: 27 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13529 04/09/2024 $2,628.51
Invoice Amount
Import - 13342 $2,628.51
13530 04/10/2024 $820.00
Invoice Amount
013386 $820.00
13531 04/10/2024 $1,653.62
Invoice Amount
318670-00 $167.58
318643-00 $531.85
318476-00 $954.19
13532 04/10/2024 $975.00
Invoice Amount
10118 $975.00
13533 04/10/2024 $2,923.75
Invoice Amount
24031083 $2,923.75
Description
PROF SVCS 01/29/24-02/25/24, WHITTIER BRIDGE STUDY
Description
PROF SVCS FEBRUARY 2024, SENIOR RESTROOM PROJECT 3009.21 Accounts Payable BKF Engineers

ELECTRICAL SUPPLIES

ELECTRICAL SUPPLIES
Accounts Payable Advanced Avant-Garde Corp.

Accounts Payable AAA Electrical Supply, Inc.

Description

ELECTRICAL SUPPLIES
Accounts Payable A & D Transportation, L.P.

Description
BUS TRANSPORATION TO CA SCIENCE CENTER 03/28/24
Accounts Payable City of Pico Rivera
Description

WATER SVC
user: Georgina Ortiz Pages: 28 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13534 04/10/2024 $199.00
Invoice Amount
2404632 $199.00
13535 04/10/2024 $7,680.14
Invoice Amount
CL12665 $7,680.14
13536 04/10/2024 $1,628.95
Invoice Amount
120673388 $1,628.95
13537 04/10/2024 $1,657.35
Invoice Amount
36517 $1,657.35
13538 04/10/2024 $8,778.77
Invoice Amount
18540 $8,778.77
Description
JANITORIAL SVCS MARCH 2024
Description
LEGAL AD- FY 24/25 ANNUAL ACTION
Accounts Payable GENERAL BUILDING MANAGEMENT
Description
REAL ESTATE ONLINE SVCS APRIL 2024
Accounts Payable Eastern County Newspaper Group, Inc.

Description
FUEL FOR CITY VEHICLES 3/11/24-3/20/24
Accounts Payable COSTAR REALTY INFORMATION, INC.

Description
PRIME 800 # FOR MARCH 2024
Accounts Payable Cosby Oil Company
Accounts Payable Corporate Image Marketing, Inc
user: Georgina Ortiz Pages: 29 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13539 04/10/2024 $3,040.33
Invoice Amount
0500939 $20.00
0502139 $29.18
0502140 $2,366.46
0500946 $10.62
0500945 $47.87
0500944 $80.96
0500943 $23.42
0500942 $301.63
0500941 $40.70
0500940 $119.49
13540 04/10/2024 $443.94
Invoice Amount
794969964 $33.38
795426824 $410.56
13541 04/10/2024 $54.57
Invoice Amount
465370 $36.38
Accounts Payable I Copy, Inc (ibe digital)
Description

MAINTENANCE AND TONER EQUIPMENT FINANCE
Description

JANITORIAL SUPPLIES FOR FACILITIES

JANITORIAL SUPPLIES FOR PARKS
MONTHLY FILE STORAGE MARCH 2024, CED
MONTHLY FILE STORAGE MARCH 2024, CITY CLERK
Accounts Payable Home Depot
MONTHLY FILE STORAGE MARCH 2024, PUBLIC WORKS
MONTHLY FILE STORAGE MARCH 2024, PARK & REC
MONTHLY FILE STORAGE MARCH 2024, FINANCE
CED SCANNING PROJECT MARCH 2024
INITIAL MOVEIN FEE MARCH 2024
MONTHLY FILE STORAGE MARCH 2024, BUILDING DIV
Description
MONTHLY ACCOUNT MAINTENANCE FEE, MARCH 2024
MONTHLY FILE STORAGE MARCH 2024, HOUSING
Accounts Payable GRM Information Management Services, Inc user: Georgina Ortiz Pages: 30 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
465428 $18.19
13542 04/10/2024 $800.00
Invoice Amount
PIC-0033 $800.00
13543 04/10/2024 $5,260.50
Invoice Amount
PR1MS412401 $3,385.50
PR1UOR12311 $250.00
PR1UOR12401-A $1,625.00
13544 04/10/2024 $21,027.83
Invoice Amount
107085 $21,027.83
13545 04/10/2024 $227,893.53
Invoice Amount
PROGRESS PMT 17 $239,887.93
PROGRESS PMT 17A PFAS WATER TREATMENT SYSTEMS, PLANTS1,2, AND WELLS 5 02/03/24 ($11,994.40) Accounts Payable Metro Builders & Engineers Group, Ltd
Description
PFAS TREATMENT SYSTEMS-PLANTS 1,2, AND WELL 5 02/03/24-03/01/24 Accounts Payable Mariposa Landscapes, Inc
Description
LANDSCAPE MAINTENANCE SVCS MARCH 2024
PROF SVCS 01/01/24-01/31/24, NPDES PROGRAM SERVICES
UOR AND BCR PROGRAM SVCS, NOVEMBER 2023
UOR AND BCR PROGRAM SVCS, JANUARY 2024
WEBSITE APP AND MODULES APRIL 2024
Accounts Payable John L Hunter & Associates Inc.

Description

MAINTENANCE AND TONER EQUIPMENT SMITH PARK
Accounts Payable Jason Sperling DBA People Speak, LLC
Description
user: Georgina Ortiz Pages: 31 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13546 04/10/2024 $800.00
Invoice Amount
0061483-IN $200.00
0061705-IN $200.00
0061706-IN $200.00
0064894-IN $200.00
13547 04/10/2024 $11,588.69
Invoice Amount
69432 $4,395.86
69469 $2,276.85
69470 $520.12
69476 $4,395.86
13548 04/10/2024 $3,966.66
Invoice Amount
116881 $3,966.66
13549 04/10/2024 $105,728.85
Invoice Amount
3853-0224 GROUND WATER PRODUCTION & ASSESSMENT $105,728.85 CLAIMS ADMIN FEES APRIL 2024
Accounts Payable Water Replenishment District of So. California Description
STREET LIGHT MAINTENANCE AND REPAIR MARCH 2024
Accounts Payable Tristar Risk Management
Description
MONTHLY STREET LIGHT MAINTENANCE AND REPAIR FEBRUARY 2024 STREET LIGHT MAINTENANCE AND REPAIR MARCH 2024
STREET LIGHT MAINTENANCE AND REPAIR MARCH 2024

SAFETY SHOES FOR CARLOS RIVERA
Accounts Payable Tanko Streetlighting, Inc
Description

SAFETY SHOES FOR JOSE GUTIERREZ

SAFETY SHOES FOR CHRIS MADRIGAL

SAFETY SHOES FOR JAIRO BARRERAS
Accounts Payable Shoeteria, Inc.

Description
user: Georgina Ortiz Pages: 32 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
13550 04/10/2024 $61,721.00
Invoice Amount
00419622 $14,384.00
00419621 $1,408.00
00627154 $10,000.00
00627298 $5,040.00
00627309 $4,770.00
00419818 $9,609.00
00419654 $2,940.00
00231408 $13,570.00
13551 04/10/2024 $114.99
Invoice Amount
Import - 13343 $114.99
13552 04/11/2024 $5,907.50
Invoice Amount
003 $5,907.50
13553 04/11/2024 $5,448.26
Description
PROFESSIONAL SVCS 3/25/24-4/5/24, TEMP FINANCE DIRECTOR Accounts Payable Nationwide Retirement Solutions
Description

RADIO & TELECOMMINICATION
Accounts Payable LOUIE, KENNETH, L.

PROF SVCS THROUGH 01/26/24, PAVEMENT CORING & ENVIRONMENT SOIL PROF SVCS THROUGH 02/29/24, PR-INSPECTIONS
Accounts Payable Time Warner Cable
PROF SVCS THROUGH 02/23/24, PR TRAFFIC ENGINEERING SVCS PROF SVCS THROUGH 02/23/24, MINES AVE STRIPING
PROF SVCS THROUGH 02/23/24, PR REGIONAL BIKEWAY CIP NO 21280 PROF SVCS THROUGH 01/26/24, SENIOR CENTER TENANT IMPROVEMENT PROF SVCS THROUGH 01/26/24, YOUTH CENTER RENOVATIONS
PROF SVCS THROUGH 01/26/24, PR EMERGENCY STORM DRAIN
Accounts Payable Willdan Engineering
Description
user: Georgina Ortiz Pages: 33 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Invoice Amount
041124 $5,448.26
13554 04/11/2024 $1,184.62
Invoice Amount
041124 $1,184.62
13555 04/11/2024 $663.00
Invoice Amount
041124 $663.00
13556 04/11/2024 $1,932.20
Invoice Amount
041124 $1,932.20
13557 04/11/2024 $137.40
Invoice Amount
Import - 13344 $137.40
$892,157.14
CBC GenOpe - CBC General Operating Totals
Description
Radio & Telecommunication
Type EFT Totals:

Description
UNION DUES FOR P/E 04/05/24
Accounts Payable Frontier California
Description
UNION DUES FOR P/E 04/05/24
Accounts Payable SEIU Local 721
Description
PEHP BENEFIT/DEDUCTION FOR P/E 04/05/24
Accounts Payable PRMPCEA
Description
EMPLOYEE/EMPLOYER CONTRIBUTIONS FOR P/E 04/05/24 (401A) Accounts Payable Nationwide RS
user: Georgina Ortiz Pages: 34 of 35 Thursday, April 11, 2024 Number Date Description
Transaction
Amount
City of Pico Rivera
Payment Register
From Payment Date: 3/29/2024 - To Payment Date: 4/11/2024 Source Payee Name
Checks
EFTs
All
$849,545.19
Grand Totals:

Transaction Amount
$1,741,702.33
Transaction Amount
$892,157.14
Transaction Amount
user: Georgina Ortiz Pages: 35 of 35 Thursday, April 11, 2024 To: Mayor and City Council
From: City Manager
Meeting Date: April 23, 2024
Subject: AUTHORIZING APPLICATION SUBMITTAL FOR THE

LOCAL GOVERNMENT WASTE TIRE CLEANUP GRANT

FROM THE CALIFORNIA DEPARTMENT OF RESOURCES

RECYCLING AND RECOVERY
Recommendation:

1. Approve a resolution authorizing the submission of applications for funding under the California Department of Resources Recycling and Recovery Local Government Waste Tire Cleanup Grant; and

2. Authorize the City Manager or his designee to execute all program-related documents, including future grant applications and administer funding if the City’s application is awarded.

Fiscal Impact:

There is no direct fiscal impact to the General Fund from this action. The costs associated with activities of CalRecycle’s Local Government Waste Tire Cleanup Grant Program (Grant Program) are funded entirely by awarded monies received from the competitive grant program. If the application is selected, the City will receive a one-time $90,000 grant. No additional appropriations are being requested at this time.

Background:

The California Department of Resources Recycling and Recovery (CalRecycle) is administering $1.25 million through the fiscal year (FY) 2024-25 Local Government Waste Tire Cleanup Grant Program funding cycle. The Grant Program aims to fund the cleanup and abatement of waste tires collected through responsive citywide illegal dumping reports. Funding from this program derives from the California Tire Recycling Management Fund, where fees are levied on the sale of new tires.

California leads the country with the most registered vehicles than any other state.

Consequently, more than 51 million reusable and waste tires are generated annually, ultimately posing a potential threat to public health. For example, discarded tires may become a habitat for pests, including mosquitoes, which are capable of transmitting various diseases. Additionally, these waste tires pose a fire hazard and can emit harmful smoke when burned. CalRecycle aims to collaborate with local governments to remove 5 CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024

AUTHORIZING APPLICATION SUBMITTAL FOR THE LOCAL GOVERNMENT WASTE

TIRE CLEANUP GRANT FROM THE CALIFORNIA DEPARTMENT OF RESOURCES

RECYCLING AND RECOVERY

Page 2 of 2 ends

the public health threats that waste tires pose to our community.

Discussion:

CalRecycle administers approximately $1.7 million annually in competitive grants to eligible cities and counties, for activities that support the abatement of illegally disposed waste tires. The Grant Program funds the collection, removal, transportation, recycling, and disposal of waste tires, including staff time, equipment, and contracts.

This is the first time the City of Pico Rivera (City) is applying for this Grant Program. Staff recommends submitting a grant requesting $90,000 to administer a responsive program to public reports of illegally dumped tires. Under this program, the City will dispatch a team to travel to the subject site, collect the tires, transport the tires to a certified CalRecycle facility, and dispose and recycle the tires.

CalRecycle’s guidelines require jurisdictions to submit its completed funding request certification along with an adopted resolution that authorizes application submission, identifies the specific CalRecycle program for which the applicant is eligible, designates staff for administration of the program-related documentation, and establishes the time period for which the authorizations are valid, preferably until rescinded. Program expenditures may start no earlier than the date of the award, which will tentatively begin in August 2024. Distribution of payments will begin in August 2024, and the term will end on October 29, 2026.

Since the City has not previously submitted for this Grant Program, the City must submit an approved and passed resolution to CalRecycle to participate and receive funds from the Grant Program.

Conclusion:

Staff recommends that the City Council approve a resolution (Enclosure 1) authorizing the City’s submission of an application for the Grant Program and authorizing the City Manager or his authorized designee to execute all program-related documents and administer the program if the City’s application is selected for funding.

Steve Carmona
SC:AG:VHF:ac
Enclosure: 1) Resolution
RESOLUTION NO. ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PICO

RIVERA, CALIFORNIA, AUTHORIZING SUBMISSION OF GRANT

APPLICATIONS AND RELATED AUTHORIZATIONS FOR THE WASTE

TIRE CLEANUP GRANT PROGRAM ADMINISTERED BY CALRECYCLE
WHEREAS, the California Public Resources Code authorizes the Department of Resources Recycling and Recovery (CalRecycle) to administer various grant programs, including the Waste Tire Cleanup Grant; and
WHEREAS, in furtherance of this authority, CalRecycle is required to establish procedures governing the administration of the grant programs; and WHEREAS, CalRecycle grant application procedures require, among other things, an applicant’s governing body to declare by resolution certain authorizations related to the administration of CalRecycle grants.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pico Rivera as follows:

SECTION 1. That the City of Pico Rivera is authorized to submit applications to CalRecycle for the Waste Tire Cleanup Grant, including future grant applications.

SECTION 2. The City Manager, or his/her designee, is hereby authorized as Signature Authority to execute all documents necessary to implement and secure payment.

SECTION 3. That this authorization is effective until rescinded by the Signature Authority or this governing body.

SECTION 4. The City Clerk shall attest and certify the passage and approval of this resolution and it shall become effective immediately upon its approval.

APPROVED AND PASSED this 23rd day of April, 2024.
____________________________
Andrew C. Lara, Mayor
ATTEST: APPROVED AS TO FORM:
______________________ ______________________________
Cynthia Ayala, City Clerk Arnold M. Alvarez-Glasman, City Attorney AYES:

NOES:

Enclosure 1
5a
To: Mayor and City Council
From: City Manager
Meeting Date: April 23, 2024
Subject: ESTABLISHING JOB CLASSIFICATION FOR THE FULLTIME SENIOR WATER TREATMENT SUPERVISOR AND

RECLASSIFY THE CURRENT WATER TREATMENT

SUPERVISOR TO SENIOR WATER TREATMENT

SUPERVISOR
Recommendation:

1. Approve a resolution establishing job classification for the Senior Water Treatment Supervisor, and

2. Approve the reclassification of a Public Works employee from their current position as the Water Treatment Supervisor to the Senior Water Treatment Supervisor.

Fiscal Impact:

Sufficient funding has been appropriated in the fiscal year (FY) 2023-24 Adopted Budget.

No additional funding is needed for this recommended action.

Background:

The Pico Rivera Water Authority (PRWA) has built Treatment Facilities at each active well site to remove Perfluoroalkyl and Polyfluoroalkyl (PFAS) substances as part of the citywide PFAS project. The City of Pico Rivera (City) must adhere to water treatment protocols and guidelines established by the State Water Resources Control Board, which have stringent regulations and guidelines. As a result, it is necessary to employ certified personnel capable of operating and maintaining materials, equipment, and supplies required to operate water treatment plants.

Discussion:

The PFAS project includes strict requirements and guidelines as described above. The City would need to employ a certified supervisor to oversee all aspects associated with the operation of water treatment plants. The position will use electronic and computerbased systems for gathering and analyzing real-time data, known as Supervisory Control 6 CITY COUNCIL AGENDA REPORT – MEETING OF APRIL 23, 2024

ESTABLISHING JOB CLASSIFICATION FOR THE FULL-TIME SENIOR WATER

TREATMENT SUPERVISOR AND RECLASSIFY THE CURRENT WATER

TREATMENT SUPERVISOR TO SENIOR WATER TREATMENT SUPERVISOR

Page 2 of 2 ends

and Data Acquisition (SCADA) for various water treatment areas. Due to the size and complexity of this new undertaking, the City’s Public Works team has assessed the experience level required and has determined a senior level supervisor would best meet the needs of the City and the new treatment process. As such, staff recommend the establishment of the job description for a Senior Water Treatment Supervisor.

This role requires a higher level of education and certifications than other Water Division classifications. As a result, it will be necessary to have a Senior Water Treatment Supervisor who will be responsible for overseeing the day-to-day operations of these facilities. The current Water Treatment Supervisor meets the requirements for this recommended position. Staff seeks authorization to reclassify this person to the Senior Water Treatment Supervisor.

Conclusion:

Staff recommends that the City Council approve a resolution (Enclosure 1) establishing the job classification for the Senior Water Treatment Supervisor and reclassify a Public Works employee from their current position as the Water Treatment Supervisor to the Senior Water Treatment Supervisor.

Steve Carmona
SC:KS:sp
Enclosure: 1) Resolution/Exhibit A and Exhibit B

RESOLUTION NO. ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PICO RIVERA, CALIFORNIA, ESTABLISHING JOB CLASSIFICATION FOR THE FULLTIME SENIOR WATER TREATMENT SUPERVISOR AND RECLASSIFY A

PUBLIC WORKS EMPLOYEE FROM WATER TREATMENT SUPERVISOR

TO SENIOR WATER TREATMENT SUPERVISOR
WHEREAS, the City Council of the City of Pico Rivera seeks to establish new classification, and job description for the Senior Water Treatment Supervisor position; and WHEREAS, it is agreeable and desirable to reclassify a current Public Works employee from Water Treatment Supervisor to Senior Water Treatment Supervisor; and WHEREAS, this Resolution shall remain in effect until superseded by a subsequent resolution concerning this matter.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Pico Rivera as follows:

SECTION 1. The job description for the position of “Senior Water Treatment Supervisor” as reviewed and approved by Human Resources and the members of the Pico Rivera Mid Managers and Professional & Confidential Employees Association as set forth in Exhibit “A” attached hereto is hereby adopted.

SECTION 2. The Salary Schedules for Senior Water Treatment Supervisor, as set forth in Exhibit “B” is hereby established.

SECTION 3. The City Council reserves the right and discretion to review and amend this Resolution as it deems necessary.

SECTION 4. The City Clerk shall attest to the passage of this resolution, and it shall thereupon be in full force effect.

APPROVED AND PASSED this 23rd day of April 2024.
____________________________
Andrew C. Lara, Mayor
ATTEST: APPROVED AS TO FORM:
____________________________ _______________________________ Cynthia Ayala, CMC, City Clerk Arnold M. Alvarez-Glasman, City Attorney AYES:

NOES:

ENCLOSURE 1
6a
RESOLUTION NO. ____

Page 2 of 9 ends

EXHIBIT “A”

GENERAL PURPOSE
Supervises staff, contractors and vendors and performs a variety of administrative and technical functions related to the water treatment and production operations and pumping and treatment facilities.

The Senior Water Treatment Supervisor is a section head in the Water Division responsible for supervising the day-to-day operations of all water production and treatment related functions including the construction and maintenance and operation of telemetry, underground wells, pumps, meters, engines, storage, and related water treatment facilities.

The employee supervises staff, responds to emergencies, and ensures continuity of services and the safety of the water supply.

EXAMPLES OF ESSENTIAL FUNCTIONS
The duties listed below are intended only as illustrations of the various types of work that may be performed by employees in this classification. Functions may be added, modified or deleted to meet the needs of the City.
 Carries out supervisory responsibilities in accordance with policies, procedures, and applicable laws, including: interviewing, hiring and training staff; developing schedules and distributing work orders; establishing deadlines; briefing staff on safety procedures; appraising performance; rewarding and disciplining employees; coordinating, developing and approving staff training; and addressing complaints and resolving problems.
 Plans, schedules, organizes, directs, and inspects the work of crews engaged in the operation, installation, repair, renewal, and maintenance of all water pumps, and operating valves and piping in water pumping facilities. Supervises, inspects, and participates in the work crews performing water treatment and production activities, including the maintenance and repair of water treatment facilities, booster pump stations, underground wells, and pumping facilities.
 Supervises the testing, repair, replacement and/or installation of all water meters, fire services and hydrants, electrical equipment, regulators, relief and control valves, vacuum breakers, air release valves, pumps, and appurtenances; operation of water treatment and pumping plants; cleaning, maintenance, and repair of reservoirs and storage tanks; maintenance of water division properties and structures.

RESOLUTION NO. ____

Page 3 of 9 ends
← All documents from this meeting