Cities Index.
Agenda

Hemet City Council
August 9, 2022

Document
Agenda
Meeting
August 9, 2022
Body
Hemet City Council
Pages
2,213
Original file
183.3 MB
Text extracted from the city's file for reading and search. Open the original on hemetca.civicweb.net. That file is the official record.

14.A

Page 194 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 4,986.38 $ $ 4,986.38
Planning/Design 39,891.04 $ $ 39,891.04
ROW $ - $ -
Construction 413,869.54 $ $ 413,869.54
CM/Inspection 39,891.04 $ $ 39,891.04
Other $ - $ -
Total Cost $ - 498,638 $ - $ - $ - $ - $ 498,638 $
RMRA 498,638 $ $ 498,638
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 498,638 $ - $ - $ - $ - $ 498,638 $ - $
FY 2022/2023 - FY 2026/2027
2020/21 SB1 PAVEMENT REHABILITATION
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
Project Cost:

Engineering
26/27 NEW

REQUEST
COST

COMPLETE
$ -

PROJECTED

FUTURE YEARS
Project Description/Justification:

Design

PROJECTED

FUTURE YEARS
22/23 NEW

REQUEST

PREVIOUSLY

APPROPRIATED
The project will provide rehabilitation to Devonshire Ave from Sanderson Ave to Kirby St, Devonshire Ave from State St to Thompson St, Latham Ave from Gilmore St to Palm Ave, and Buena Vista St from Johnston Ave to Stetson Ave in Districts 1, 3, and 5. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

LOCATION MAP
26/27 NEW

REQUEST
COST

COMPLETE
5713
Public Works
Roads

CAPITAL IMPROVEMENT PROGRAM
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST

Page 53 of 112 ends

14.A

Page 195 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 50,000 $ $ 50,000
Planning/Design 400,000 $ $ 400,000
ROW $ - $ -
Construction 4,150,000 $ $ 4,150,000
CM/Inspection 400,000 $ $ 400,000
Other $ - $ -
Total Cost $ - 5,000,000 $ - $ - $ - $ - $ 5,000,000 $
WATER 5,000,000 $ $ 5,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 5,000,000 $ - $ - $ - $ - $ 5,000,000 $
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -
Water
FY 2022/2023 - FY 2026/2027
COST

COMPLETE
5717
Public Works
Infrastructure

CAPITAL IMPROVEMENT PROGRAM
WELL 15 & 16 TREATMENT
Project Cost: 26/27 NEW

REQUEST
This project will provide for the treatment of wells 15 and 16. During recent testing it was found that both wells exceeded the maximum contaminant level (MCL) for 1,2,3- Trichloropropane (TCP). Granular activated carbon (GAC) treatment is needed to bring these wells back on-line for potable use.

LOCATION MAP
25/26 NEW

REQUEST
COST

COMPLETE
$ -

PROJECTED

FUTURE YEARS
Project Description/Justification:

Planning

PROJECTED

FUTURE YEARS
22/23 NEW

REQUEST

PREVIOUSLY

APPROPRIATED
23/24 NEW

REQUEST
24/25 NEW

REQUEST

Page 54 of 112 ends

14.A

Page 196 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 10,000 $ $ 10,000
Planning/Design 25,000 $ $ 25,000
ROW $ -
Construction 1,900,500 $ $ 1,900,500
CM/Inspection 180,000 $ $ 180,000
Other $ -
Total Cost $ - 2,115,500 $ - $ - $ - $ - $ 2,115,500 $
PARKS 165,500 $ $ 165,500
ARPA 1,950,000 $ $ 1,950,000
$ -
$ -
$ -
$ -
Total Cost $ - 2,115,500 $ - $ - $ - $ - $ 2,115,500 $
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -
Parks
FY 2022/2023 - FY 2026/2027
COST

COMPLETE
5718
Public Works
Facilities

CAPITAL IMPROVEMENT PROGRAM

SKATEBOARD PARK AT GIBBEL PARK
Project Cost: 26/27 NEW

REQUEST
The project calls for the construction of a skate park in Gibbel Park. The skate park will provide the community's youth a healthy recreational activity.

LOCATION MAP
25/26 NEW

REQUEST
COST

COMPLETE
$ -

PROJECTED

FUTURE YEARS
Project Description/Justification:

Design

PROJECTED

FUTURE YEARS
22/23 NEW

REQUEST

PREVIOUSLY

APPROPRIATED
23/24 NEW

REQUEST
24/25 NEW

REQUEST

Page 55 of 112 ends

14.A

Page 197 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ -
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 155,000 $ $ 155,000
Total Cost $ - 155,000 $ - $ - $ - $ - $ 155,000 $
WATER 155,000 $ $ 155,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 155,000 $ - $ - $ - $ - $ 155,000 $
Project Description/Justification:

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

WATER DISTRIBUTION SYSTEM ANALYSIS
5719
$ -
COST

COMPLETE
$ -

PROJECTED

FUTURE YEARS
Source of Funds: 23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
The City water system consists of wells, pumps, tanks and distribution lines which provide a uniform pressure system and adequate delivery to meet normal and peak demands, and provide adequate flow for fire suppression systems. In order to ensure that the system is operating effectively and to identify service areas which may have a variety of issues such as undersized piping, lack of redundancy for service delivery (looping) and pressure issues, it is necessary to undertake a Water System Distribution Analysis. The City last undertook such an analysis in 1990; since then, the City has grown and service demands have changed. This study is necessary in order to identify various service distribution area deficiencies which may then be used to establish future Capital Improvement Projects to continue to ensure that the City may meet both current and future service needs.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
26/27 NEW

REQUEST
Planning
Infrastructure
Public Works
Water

Page 56 of 112 ends

14.A

Page 198 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 5,000 $ $ 5,000
Planning/Design $ -
ROW $ -
Construction 50,000 $ $ 50,000
CM/Inspection 5,000 $ $ 5,000
Other $ -
Total Cost $ - 60,000 $ - $ - $ - $ - $ 60,000 $
Water 60,000 $ $ 60,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 60,000 $ - $ - $ - $ - $ 60,000 $ - $
$ -
COST

COMPLETE
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Design

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
WELL SITE SECURITY FENCING (FIRE STATION #2)
5720
Facilities
Public Works
Facilities Maintenance
Project Description/Justification:

This project installs new security fencing around both the well site at the intersection of Palm and Stetson and the employee parking lot at Fire Station #2.

Page 57 of 112 ends

14.A

Page 199 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 2,340 $ $ 2,340
Planning/Design 5,000 $ $ 5,000
ROW $ -
Construction 92,000 $ $ 92,000
CM/Inspection 8,000 $ $ 8,000
Other $ -
Total Cost $ - 107,340 $ - $ - $ - $ - $ 107,340 $
DIF 107,340 $ $ 107,340
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 107,340 $ - $ - $ - $ - $ 107,340 $ - $
$ -
COST

COMPLETE
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Planning

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
CLARIFIER UNITS FOR CORP. YARD
5721
Facilities
Public Works
Facilities Maintenance
Project Description/Justification:

The Corp. Yard Storm Water Polution Prevention Plan (SWPPP) / a field review conducted by CASC Engineering and Consulting in 2014 identified the best management practices (BMPs) to prevent potential of urban runoff pollutants from leaving the Corporate Yard site and entering the storm drain system. This project further funds implentation of the CASC recommendation and includes evaluation of several filter-type BMPs.

Page 58 of 112 ends

14.A

Page 200 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 3,576 $ $ 3,576
Planning/Design 28,606 $ $ 28,606
ROW $ -
Construction 296,785 $ $ 296,785
CM/Inspection 28,606 $ $ 28,606
Other $ -
Total Cost $ - 357,572 $ - $ - $ - $ - $ 357,572 $
CDBG 257,572 $ $ 257,572
MEASURE 'A' 100,000 $ $ 100,000
$ -
$ -
$ -
$ -
Total Cost $ - 357,572 $ - $ - $ - $ - $ 357,572 $ - $
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2021/22 ACCESSIBLE SIDEWALK AND ADA RAMPS
5722
Infrastructure
Public Works
Engineering
Project Description/Justification:

Design
Removal of existing non-compliant access ramps and construction of new ADA compliant access ramps and sidewalks on Elmwood Street between Gilbert and State, Apricot Lane between Mayberry and Central, Taylor Street between Whittier and Mayberry, and Whittier Avenue between Santa Fe Lanier. This project will provide greater ADA access in the area.

Page 59 of 112 ends

14.A

Page 201 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration 3,900 $ $ 3,900
Planning/Design 117,000 $ $ 117,000
ROW $ -
Construction 269,100 $ 1,408,000 $ $ 1,677,100
CM/Inspection $ 192,000 $ 192,000
Other $ -
Total Cost $ 1,600,000 390,000 $ - $ - $ - $ - $ 1,990,000 $ DIF 390,000 $ 1,600,000 $ $ 1,990,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 1,600,000 390,000 $ - $ - $ - $ - $ 1,990,000 $ Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

TRAFFIC SIGNAL INSTALLATION, WARREN AND DEVONSHIRE
5723
Engineering
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will install a new traffic signal at Warren Road and Devonshire Avenue. In addition, the project will also implement new signing and striping to accommodate for the upgrades. These improvements will improve safety and help control traffic flow in the area.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 60 of 112 ends

14.A

Page 202 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration 5,000 $ 2,458 $ $ 7,458
Planning/Design 48,079 $ $ 48,079
ROW $ - $ -
Construction $ 221,220 $ 221,220
CM/Inspection $ 22,122 $ 22,122
Other $ - $ -
Total Cost $ 245,800 53,079 $ - $ - $ - $ - $ 298,879 $ HSIP 53,079 $ 245,800 $ $ 298,879
$ -
$ -
$ -
$ -
$ -
Total Cost $ 245,800 53,079 $ - $ - $ - $ - $ 298,879 $ Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

CITYWIDE TRAFFIC SIGNAL VISIBILITY UPGRADES
5724
Engineering
Project Description/Justification:

Design
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project includes improving forty (40) signalized intersections by replacing the signal head backplates with backplates with retroreflective borders per the CA MUTCD. The project will increase the visibility of existing City traffic signals.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 61 of 112 ends

14.A

Page 203 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration 5,000 $ $ 5,000
Planning/Design $ -
ROW $ -
Construction 30,000 $ $ 30,000
CM/Inspection 5,000 $ $ 5,000
Other $ -
Total Cost $ - 40,000 $ - $ - $ - $ - $ 40,000 $
MEASURE 'A' 40,000 $ $ 40,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 40,000 $ - $ - $ - $ - $ 40,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2021/22 CITYWIDE SLURRY SEAL, LOCATIONS TBD
5725
Engineering
Project Description/Justification:

Closeout
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 62 of 112 ends

14.A

Page 204 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration 19,925 $ $ 19,925
Planning/Design 159,400 $ $ 159,400
ROW $ - $ -
Construction 1,653,775 $ $ 1,653,775
CM/Inspection 159,400 $ $ 159,400
Other $ - $ -
Total Cost $ - 1,992,500 $ - $ - $ - $ - $ 1,992,500 $
MEASURE 'A' 1,992,500 $ $ 1,992,500
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,992,500 $ - $ - $ - $ - $ 1,992,500 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2021/22 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD 5726
Engineering
Project Description/Justification:

Construction
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 63 of 112 ends

14.A

Page 205 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 16,500 $ 16,500
Planning/Design $ 132,000 $ 132,000
ROW $ - $ -
Construction $ 1,369,500 $ 1,369,500
CM/Inspection $ 132,000 $ 132,000
Other $ - $ -
Total Cost $ 1,650,000 - $ - $ - $ - $ - $ 1,650,000 $
RMRA $ 1,650,000 $ 1,650,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 1,650,000 - $ - $ - $ - $ - $ 1,650,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2021/22 SB1 PAVEMENT REHABILITATION, EL GRANDE ESTATES
5727
Engineering
Project Description/Justification:

Construction
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will provide rehabilitation within the El Grande Estates Community in the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 64 of 112 ends

14.A

Page 206 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 3,309 $ $ 3,309
Planning/Design 26,475 $ $ 26,475
ROW $ -
Construction 274,674 $ $ 274,674
CM/Inspection 26,475 $ $ 26,475
Other $ -
Total Cost $ - 330,933 $ - $ - $ - $ - $ 330,933 $
MEASURE 'A' 82,733 $ $ 82,733
SB 821 248,200 $ $ 248,200
$ -
$ -
$ -
$ -
Total Cost $ - 330,933 $ - $ - $ - $ - $ 330,933 $
COST

COMPLETE
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

STATE STREET IMPROVEMENTS, FRUITVALE TO ESPLANADE
5728
Roads
Public Works
Engineering
Project Description/Justification:

Design
Install new sidewalk or complete sidewalk infill at various locations along State Street between Fruitvale and Esplanade. This work will be constructed with the State Streete Strorm Drain Improvements and include rehabilitation on a portion of the existign roadway.

Page 65 of 112 ends

14.A

Page 207 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration 15,000 $ $ 15,000
Planning/Design 120,000 $ $ 120,000
ROW $ -
Construction 1,245,000 $ $ 1,245,000
CM/Inspection 120,000 $ $ 120,000
Other $ -
Total Cost $ - 1,500,000 $ - $ - $ - $ - $ 1,500,000 $
SEWER 1,500,000 $ $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,500,000 $ - $ - $ - $ - $ 1,500,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2021/22 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD 5729
Wastewater
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 66 of 112 ends

14.A

Page 208 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration 550 $ 550 $ 550 $ $ 1,650
Planning/Design 4,400 $ 4,400 $ 4,400 $ $ 13,200
ROW $ - - $ - $ $ -
Construction 45,650 $ 45,650 $ 45,650 $ $ 136,950
CM/Inspection 4,400 $ 4,400 $ 4,400 $ $ 13,200
Other $ - - $ - $ $ -
Total Cost $ 55,000 55,000 $ 55,000 $ - $ - $ - $ 165,000 $ STORM DRAIN 55,000 $ 55,000 $ 55,000 $ $ 165,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 55,000 55,000 $ 55,000 $ - $ - $ - $ 165,000 $ Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

CATCH BASIN TRASH CAPTURE DEVICE INSTALLATION
5730
Streets
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
Install State certified trash capture devices on all stormwater catch basins in priority locations throughout the City. The City maintains approximately 165 catch basins within these identified areas. These are required to be install by the State Water Resources Control Board (SWRCB).

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 67 of 112 ends

14.A

Page 209 of 2213 ends

Project Number:

Category: Facilities
Department:

Division:

Project Status:

Administration $ -
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 55,000 $ $ 55,000
Total Cost $ - 55,000 $ - $ - $ - $ - $ 55,000 $
PARKS 19,000 $ $ 19,000
PRE 218 LLMD 18,000 $ $ 18,000
POST 218 LLMD 18,000 $ $ 18,000
$ -
$ -
$ -
Total Cost $ - 55,000 $ - $ - $ - $ - $ 55,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

PARK STRUCTURE EVALUATION
5731
Parks
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
This evaluation would be to assess all park structures such as gazebos and playground equipment and prepare a recommendation for renovation and replacement. Several of the gazebos at a couple of City parks (Mary Henley / Weston) are in poor condition and should be evaluated for either replacement or upgrade.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 68 of 112 ends

14.A

Page 210 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 7,000 $ $ 7,000
Planning/Design 63,000 $ $ 63,000
ROW $ -
Construction $ -
CM/Inspection $ -
Other $ -
Total Cost $ - 70,000 $ - $ - $ - $ - $ 70,000 $
M.U. - POLICE 70,000 $ $ 70,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 70,000 $ - $ - $ - $ - $ 70,000 $
COST

COMPLETE
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

POLICE DEPARTMENT/PIO FACILITY UPGRADE
5732
Facilities
Police Department
Project Description/Justification:

Planning
The assessment of current office configurations, including technology upgrades, interior design and layout, interior decoration (including wall treatments, floor treatments, color development, furniture specifications and other aspects of interior design), and ADA compliance assessment, includign the design of the identified improvements.

Page 69 of 112 ends

14.A

Page 211 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 1,500 $ $ 1,500
Planning/Design 12,000 $ $ 12,000
ROW $ - $ -
Construction 124,500 $ $ 124,500
CM/Inspection 12,000 $ $ 12,000
Other $ - $ -
Total Cost $ - 150,000 $ - $ - $ - $ - $ 150,000 $
M.U. - FIRE 150,000 $ $ 150,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 150,000 $ - $ - $ - $ - $ 150,000 $
COST

COMPLETE
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
FIRE STATION NO. 3 FACILITY SAFETY ENHANCEMENTS
5733
Facilities
Fire
Project Description/Justification:

Planning
New landscape and irrigation as well as construction of block walls capable of providing vehicle protection while enhancing the appearance of the site.

Page 70 of 112 ends

14.A

Page 212 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 7,450 $ $ 7,450
Planning/Design $ -
ROW $ -
Construction 677,950 $ $ 677,950
CM/Inspection 59,600 $ $ 59,600
Other $ -
Total Cost $ - 745,000 $ - $ - $ - $ - $ 745,000 $
M.U. - FIRE 745,000 $ $ 745,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 745,000 $ - $ - $ - $ - $ 745,000 $
COST

COMPLETE
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

FIRE TRAINING FACILITY
5734
Facilities
Fire
Project Description/Justification:

Construction
Construction of a new training facility to be located at Fire Station #4.

Page 71 of 112 ends

14.A

Page 213 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 1,513 $ $ 1,513
Planning/Design $ -
ROW $ -
Construction 137,660 $ $ 137,660
CM/Inspection 12,102 $ $ 12,102
Other $ - $ -
Total Cost $ - 151,275 $ - $ - $ - $ - $ 151,275 $
PARKS 151,275 $ $ 151,275
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 151,275 $ - $ - $ - $ - $ 151,275 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

NATIONAL FITNESS CAMPAIGN EQUIPMENT
5735
Facilities
Public Works
Parks
Project Description/Justification:

Construction of an outdoor fitness court at Mary Henley Park. The court will feature 7 functional training zones, thousands of bodyweight exercises, and digital programming for adults of all ages and abilities. The Fitness Court will accommodate up to 30 individuals at once, over 36 progressive training stations, an integrated sports floor, and adaptable community programming.

Construction

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
$ -
$ -
$ -

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
$ -
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 72 of 112 ends

14.A

Page 214 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 6,962 $ $ 6,962
Planning/Design 55,697 $ $ 55,697
ROW $ -
Construction 577,858 $ $ 577,858
CM/Inspection 55,697 $ $ 55,697
Other $ -
Total Cost $ - 696,215 $ - $ - $ - $ - $ 696,215 $
ARPA 696,215 $ $ 696,215
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 696,215 $ - $ - $ - $ - $ 696,215 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

MARY HENLEY PARK IMPROVEMENTS
TBD
Facilities
Public Works
Parks
Project Description/Justification:

The project will include various improvements to the existign Mary Henley Park such as replacement of aging/deteriorated restrooms, playground equipment, shade structures, and gazebos.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 73 of 112 ends

14.A

Page 215 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 10,320 $ $ 10,320
Planning/Design 82,563 $ $ 82,563
ROW $ -
Construction 856,589 $ $ 856,589
CM/Inspection 82,563 $ $ 82,563
Other $ -
Total Cost $ - 1,032,035 $ - $ - $ - $ - $ 1,032,035 $
ARPA 1,032,035 $ $ 1,032,035
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,032,035 $ - $ - $ - $ - $ 1,032,035 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

BRUBAKER PARK IMPROVEMENTS
TBD
Facilities
Public Works
Parks
Project Description/Justification:

The project will include various improvements to the existign Brubaker Park such as replacement of aging/deteriorated restrooms, playground equipment, shade structures, and gazebos.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 74 of 112 ends

14.A

Page 216 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 18,000 $ $ 18,000
Planning/Design 144,000 $ $ 144,000
ROW $ -
Construction 1,494,000 $ $ 1,494,000
CM/Inspection 144,000 $ $ 144,000
Other $ -
Total Cost $ - 1,800,000 $ - $ - $ - $ - $ 1,800,000 $
ARPA 1,800,000 $ $ 1,800,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,800,000 $ - $ - $ - $ - $ 1,800,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

CITYWIDE ROADWAY IMPROVEMENTS
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation or improvement to various streets within the City.

The improvement of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 75 of 112 ends

14.A

Page 217 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 2,000 $ $ 2,000
Planning/Design 16,000 $ $ 16,000
ROW $ -
Construction 166,000 $ $ 166,000
CM/Inspection 16,000 $ $ 16,000
Other $ -
Total Cost $ - 200,000 $ - $ - $ - $ - $ 200,000 $
ARPA 200,000 $ $ 200,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 200,000 $ - $ - $ - $ - $ 200,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

SOLAR POWERED STREET LIGHTS
TBD
Infrastructure
Public Works
Streets
Project Description/Justification:

This project will install new solar powered street lights at the intersections of Myers/Devonshire and Warren/Stetsion as well as other potential locations illuminating areas with little lighting to increase safety.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 76 of 112 ends

14.A

Page 218 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 3,500 $ $ 3,500
Planning/Design 28,000 $ $ 28,000
ROW $ -
Construction 290,500 $ $ 290,500
CM/Inspection 28,000 $ $ 28,000
Other $ -
Total Cost $ - 350,000 $ - $ - $ - $ - $ 350,000 $
ARPA 350,000 $ $ 350,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 350,000 $ - $ - $ - $ - $ 350,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

SIMPSON CENTER - ADA PARKING AND FIRE LANE IMPROVEMENTS TBD
Facilities
Public Works
Engineering
Project Description/Justification:

This project will re-pave the existing Simpson Center parking lot including providing an adequate number of ADA parking spaces as well as a concrete fire lane for access to Fire Station No. 1.

Design

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 77 of 112 ends

14.A

Page 219 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 15,000 $ $ 15,000
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 150,000 $ $ 150,000
Total Cost $ - 165,000 $ - $ - $ - $ - $ 165,000 $
ARPA 165,000 $ $ 165,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 165,000 $ - $ - $ - $ - $ 165,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will replace existing combination code or traditional key locks with badge readers to gain access to various City buildings.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

BADGE READERS AT CITY FACILITIES
TBD
Facilities
Public Works/IT
Facilities Maintenance
Project Description/Justification:

Page 78 of 112 ends

14.A

Page 220 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 10,525 $ $ 10,525
Planning/Design 84,198 $ $ 84,198
ROW $ -
Construction 873,553 $ $ 873,553
CM/Inspection 84,198 $ $ 84,198
Other $ -
Total Cost $ - 1,052,473 $ - $ - $ - $ - $ 1,052,473 $
ARPA 1,052,473 $ $ 1,052,473
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,052,473 $ - $ - $ - $ - $ 1,052,473 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will upgrade the existing HVAC system at the City Library.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

LIBRARY VENTILATION IMPROVEMENTS
TBD
Facilities
Public Works/Library
Facilities Maintenance
Project Description/Justification:

Page 79 of 112 ends

14.A

Page 221 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 25,000 $ $ 25,000
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 975,000 $ $ 975,000
Total Cost $ - 1,000,000 $ - $ - $ - $ - $ 1,000,000 $
ARPA 1,000,000 $ $ 1,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 1,000,000 $ - $ - $ - $ - $ 1,000,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will upgrade/modernize the City's existing telephone and network infrastructure.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

TELEPHONE AND NETWORK MODERNIZATION
TBD
Equipment
IT
Equipment Maintenance
Project Description/Justification:

Page 80 of 112 ends

14.A

Page 222 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ -
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 50,000 $ $ 50,000
Total Cost $ - 50,000 $ - $ - $ - $ - $ 50,000 $
ARPA 50,000 $ $ 50,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 50,000 $ - $ - $ - $ - $ 50,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will enhance the children's patio on the east side of the Library to include tables with benches, a drinking fountain, sunshades, and play equipment. These improvements will provide a safe place for children and families that walk to the Library to play before and after storytime.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

CHILDREN'S PATIO AT LIBRARY
TBD
Facilities
Library
Facilities Maintenance
Project Description/Justification:

Page 81 of 112 ends

14.A

Page 223 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ -
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 350,000 $ $ 350,000
Total Cost $ - 350,000 $ - $ - $ - $ - $ 350,000 $
ARPA 350,000 $ $ 350,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 350,000 $ - $ - $ - $ - $ 350,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will replace/refresh the existing network firewall at the Library.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

REFRESH LIBRARY FIREWALL
TBD
Infrastructure
IT
Equipment Maintenance
Project Description/Justification:

Page 82 of 112 ends

14.A

Page 224 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ -
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other 500,000 $ $ 500,000
Total Cost $ - 500,000 $ - $ - $ - $ - $ 500,000 $
ARPA 500,000 $ $ 500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 500,000 $ - $ - $ - $ - $ 500,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
This project will rehabilitate the exterior areas of the Police Department and Fire Department facility to improve safety as well as ingress and egress of public safety equipment. It would include an exterior block wall around both facilities, redesign of the parking lot, upgraded lighting, and new entry and exit signs.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

POLICE EXTERNAL SAFETY AND INFRASTRUCTURE UPGRADES
TBD
Infrastructure
Police
Facilities Maintenance
Project Description/Justification:

Page 83 of 112 ends

14.A

Page 225 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration 50,000 $ $ 50,000
Planning/Design 150,000 $ $ 150,000
ROW $ -
Construction $ -
CM/Inspection $ -
Other 1,800,000 $ $ 1,800,000
Total Cost $ - 2,000,000 $ - $ - $ - $ - $ 2,000,000 $
ARPA 2,000,000 $ $ 2,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - 2,000,000 $ - $ - $ - $ - $ 2,000,000 $ - $

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
$ -
This project includes the evaluation, retrofit, and remodel of various fire statiosn in the City. The improvements include the retrofit/remodel as necessary per the evaluation for station 1, 2, and 3, installation of Heartsaver station alarm notification systems in all stations, diesel smoke extractioin systems in all stations, and professional washing machines at stations 1, 2, and 3.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
$ -
$ -

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

FIRE STATION FACILITY EVALUATION/RETROFIT/REMODEL, INTERNAL FIRE STATION

SYSTEM UPGRADES
TBD
Facilities
Fire
Facilities Maintenance
Project Description/Justification:

Page 84 of 112 ends

14.A

Page 226 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 7,500 $ 7,500
Planning/Design $ 60,000 $ 60,000
ROW $ -
Construction $ 622,500 $ 622,500
CM/Inspection $ 60,000 $ 60,000
Other $ -
Total Cost $ 750,000 - $ - $ - $ - $ - $ 750,000 $
MEASURE 'A' $ 750,000 $ 750,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 750,000 - $ - $ - $ - $ - $ 750,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2022/23 CITYWIDE SLURRY SEAL, LOCATIONS TBD
TBD
Engineering
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 85 of 112 ends

14.A

Page 227 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 25,000 $ 25,000
Planning/Design $ 200,000 $ 200,000
ROW $ - $ -
Construction $ 2,075,000 $ 2,075,000
CM/Inspection $ 200,000 $ 200,000
Other $ - $ -
Total Cost $ $ - 2,500,000 $ - $ - $ - $ - $ 2,500,000
MEASURE 'A' $ 2,500,000 $ 2,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ $ - 2,500,000 $ - $ - $ - $ - $ 2,500,000
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2022/23 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD TBD
Engineering
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 86 of 112 ends

14.A

Page 228 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ 19,000 $ 19,000
Planning/Design $ 152,000 $ 152,000
ROW $ -
Construction $ 1,577,000 $ 1,577,000
CM/Inspection $ 152,000 $ 152,000
Other $ -
Total Cost $ 1,900,000 - $ - $ - $ - $ - $ 1,900,000 $
RMRA $ 1,900,000 $ 1,900,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 1,900,000 - $ - $ - $ - $ - $ 1,900,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2022/23 SB1 PAVEMENT REHABILITATION
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation of Trevor Lane, Woodland Drive - westerly limit to Meridian, Cawston Avenue - Devonshire to Meno, and Olive Tree Lane - westerly limit to San Jacinto. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Design

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED
$ -
$ -
$ -

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
$ -
$ -
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 87 of 112 ends

14.A

Page 229 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ -
Total Cost $ 1,500,000 - $ - $ - $ - $ - $ 1,500,000 $
WATER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 1,500,000 - $ - $ - $ - $ - $ 1,500,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2022/23 CITYWIDE WATER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Water
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
The project calls for the replacement of aging water mains. The project will allow the City to maintain its overall water system to mitigate against corrosion and health risks that come with aging water mains.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 88 of 112 ends

14.A

Page 230 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ - $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ - $ -
Total Cost $ 1,500,000 - $ - $ - $ - $ - $ 1,500,000 $
SEWER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 1,500,000 - $ - $ - $ - $ - $ 1,500,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2022/23 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Wastewater
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 89 of 112 ends

14.A

Page 231 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 25,000 $ 25,000
Planning/Design $ -
ROW $ -
Construction $ -
CM/Inspection $ -
Other $ 475,000 $ 475,000
Total Cost $ 500,000 - $ - $ - $ - $ - $ 500,000 $
WATER $ 250,000 $ 250,000
SEWER $ 250,000 $ 250,000
$ -
$ -
$ -
$ -
Total Cost $ 500,000 - $ - $ - $ - $ - $ 500,000 $
Public Works

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027

WATER/SEWER SYSTEM GIS MAPPING
TBD
Water/Wastewater
Project Description/Justification:

Planning
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
Digitation and verification of the City's existing water and sewer atlas maps. This would include GPS field work to identify the location and type of manholes, valves, fire hydrants, etc.. The City has been utilitizing old assessor maps whichave not been updated and are not efficient.

LOCATION MAP
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
COST

COMPLETE
26/27 NEW

REQUEST
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE
26/27 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
$ -

Page 90 of 112 ends

14.A

Page 232 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 5,000 $ 5,000
Planning/Design $ 15,000 $ 15,000
ROW $ -
Construction $ 300,000 $ 300,000
CM/Inspection $ 30,000 $ 30,000
Other $ -
Total Cost $ 350,000 - $ - $ - $ - $ - $ 350,000 $
WATER $ 350,000 $ 350,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ 350,000 - $ - $ - $ - $ - $ 350,000 $ - $
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
TANK 4 RE-COAT
TBD
Public Works
Water
Project Description/Justification:

The project entails the interior recoating of Tank 4. The City of Hemet's four potable water tanks were constructed over 30 years ago. In FY 15/16, inspection of the tanks by divers concluded that the tanks are in need of a recoating. Keeping the interior of the tanks maintained properly is a priority as poor tank conditions can negatively impact water quality.

Page 91 of 112 ends

14.A

Page 233 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 7,500 $ 7,500
Planning/Design $ 60,000 $ 60,000
ROW $ -
Construction $ 622,500 $ 622,500
CM/Inspection $ 60,000 $ 60,000
Other $ -
Total Cost $ - - $ 750,000 $ - $ - $ - $ 750,000 $
MEASURE 'A' $ 750,000 $ 750,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 750,000 $ - $ - $ - $ 750,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2023/24 CITYWIDE SLURRY SEAL, LOCATIONS TBD
TBD
Public Works
Engineering
Project Description/Justification:

The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 92 of 112 ends

14.A

Page 234 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 20,000 $ 20,000
Planning/Design $ 160,000 $ 160,000
ROW $ -
Construction $ 1,660,000 $ 1,660,000
CM/Inspection $ 160,000 $ 160,000
Other $ -
Total Cost $ - - $ 2,000,000 $ - $ - $ - $ 2,000,000 $
MEASURE 'A' $ 2,000,000 $ 2,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 2,000,000 $ - $ - $ - $ 2,000,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2023/24 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD TBD
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 93 of 112 ends

14.A

Page 235 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ 20,000 $ 20,000
Planning/Design $ 160,000 $ 160,000
ROW $ -
Construction $ 1,660,000 $ 1,660,000
CM/Inspection $ 160,000 $ 160,000
Other $ -
Total Cost $ - - $ 2,000,000 $ - $ - $ - $ 2,000,000 $
RMRA $ 2,000,000 $ 2,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 2,000,000 $ - $ - $ - $ 2,000,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2023/24 SB1 PAVEMENT REHABILITATION, LOCATIONS TBD
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation of various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 94 of 112 ends

14.A

Page 236 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ - $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ - $ -
Total Cost $ - - $ 1,500,000 $ - $ - $ - $ 1,500,000 $
WATER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 1,500,000 $ - $ - $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2023/24 CITYWIDE WATER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Water
Project Description/Justification:

The project calls for the replacement of aging water mains. The project will allow the City to maintain its overall water system to mitigate against corrosion and health risks that come with aging water mains.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 95 of 112 ends

14.A

Page 237 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ - $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ - $ -
Total Cost $ - - $ 1,500,000 $ - $ - $ - $ 1,500,000 $
SEWER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 1,500,000 $ - $ - $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2023/24 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Wastewater
Project Description/Justification:

Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 96 of 112 ends

14.A

Page 238 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 5,000 $ 5,000
Planning/Design $ 15,000 $ 15,000
ROW $ -
Construction $ 300,000 $ 300,000
CM/Inspection $ 30,000 $ 30,000
Other $ -
Total Cost $ - - $ 350,000 $ - $ - $ - $ 350,000 $
WATER $ 350,000 $ 350,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ 350,000 $ - $ - $ - $ 350,000 $ - $
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
TANK 1 RE-COAT
TBD
Public Works
Water
Project Description/Justification:

The project entails the interior recoating of Tank 1. The City of Hemet's four potable water tanks were constructed over 30 years ago. In FY 15/16, inspection of the tanks by divers concluded that the tanks are in need of a recoating. Keeping the interior of the tanks maintained properly is a priority as poor tank conditions can negatively impact water quality.

Page 97 of 112 ends

14.A

Page 239 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 7,500 $ 7,500
Planning/Design $ 60,000 $ 60,000
ROW $ -
Construction $ 622,500 $ 622,500
CM/Inspection $ 60,000 $ 60,000
Other $ -
Total Cost $ - - $ - $ 750,000 $ - $ - $ 750,000 $
MEASURE 'A' $ 750,000 $ 750,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ 750,000 $ - $ - $ 750,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2024/25 CITYWIDE SLURRY SEAL, LOCATIONS TBD
TBD
Public Works
Engineering
Project Description/Justification:

The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 98 of 112 ends

14.A

Page 240 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 17,500 $ 17,500
Planning/Design $ 140,000 $ 140,000
ROW $ -
Construction $ 1,452,500 $ 1,452,500
CM/Inspection $ 140,000 $ 140,000
Other $ -
Total Cost $ - - $ - $ 1,750,000 $ - $ - $ 1,750,000 $
MEASURE 'A' $ 1,750,000 $ 1,750,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ 1,750,000 $ - $ - $ 1,750,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2024/25 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD TBD
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 99 of 112 ends

14.A

Page 241 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ 22,000 $ 22,000
Planning/Design $ 176,000 $ 176,000
ROW $ -
Construction $ 1,826,000 $ 1,826,000
CM/Inspection $ 176,000 $ 176,000
Other $ -
Total Cost $ - - $ - $ 2,200,000 $ - $ - $ 2,200,000 $
RMRA $ 2,200,000 $ 2,200,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ 2,200,000 $ - $ - $ 2,200,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2024/25 SB1 PAVEMENT REHABILITATION, LOCATIONS TBD
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation of various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 100 of 112 ends

14.A

Page 242 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ -
Total Cost $ - - $ - $ 1,500,000 $ - $ - $ 1,500,000 $
WATER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ 1,500,000 $ - $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2024/25 CITYWIDE WATER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Water
Project Description/Justification:

The project calls for the replacement of aging water mains. The project will allow the City to maintain its overall water system to mitigate against corrosion and health risks that come with aging water mains.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 101 of 112 ends

14.A

Page 243 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ -
Total Cost $ - - $ - $ 1,500,000 $ - $ - $ 1,500,000 $
SEWER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ 1,500,000 $ - $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2024/25 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Wastewater
Project Description/Justification:

Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 102 of 112 ends

14.A

Page 244 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 7,500 $ 7,500
Planning/Design $ 60,000 $ 60,000
ROW $ -
Construction $ 622,500 $ 622,500
CM/Inspection $ 60,000 $ 60,000
Other $ -
Total Cost $ - - $ - $ - $ 750,000 $ - $ 750,000 $
MEASURE 'A' $ 750,000 $ 750,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ 750,000 $ - $ 750,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2025/26 CITYWIDE SLURRY SEAL, LOCATIONS TBD
TBD
Public Works
Engineering
Project Description/Justification:

The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

Planning

LOCATION MAP

PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 103 of 112 ends

14.A

Page 245 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 20,000 $ 20,000
Planning/Design $ 160,000 $ 160,000
ROW $ -
Construction $ 1,660,000 $ 1,660,000
CM/Inspection $ 160,000 $ 160,000
Other $ -
Total Cost $ - - $ - $ - $ 2,000,000 $ - $ 2,000,000 $
MEASURE 'A' $ 2,000,000 $ 2,000,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ 2,000,000 $ - $ 2,000,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2025/26 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD TBD
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 104 of 112 ends

14.A

Page 246 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ 24,000 $ 24,000
Planning/Design $ 192,000 $ 192,000
ROW $ -
Construction $ 1,992,000 $ 1,992,000
CM/Inspection $ 192,000 $ 192,000
Other $ -
Total Cost $ - - $ - $ - $ 2,400,000 $ - $ 2,400,000 $
RMRA $ 2,400,000 $ 2,400,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ 2,400,000 $ - $ 2,400,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2025/26 SB1 PAVEMENT REHABILITATION, LOCATIONS TBD
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation of various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 105 of 112 ends

14.A

Page 247 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ -
Total Cost $ - - $ - $ - $ 1,500,000 $ - $ 1,500,000 $
WATER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ 1,500,000 $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2025/26 CITYWIDE WATER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Water
Project Description/Justification:

The project calls for the replacement of aging water mains. The project will allow the City to maintain its overall water system to mitigate against corrosion and health risks that come with aging water mains.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 106 of 112 ends

14.A

Page 248 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 $ 15,000
Planning/Design $ 120,000 $ 120,000
ROW $ -
Construction $ 1,245,000 $ 1,245,000
CM/Inspection $ 120,000 $ 120,000
Other $ -
Total Cost $ - - $ - $ - $ 1,500,000 $ - $ 1,500,000 $
SEWER $ 1,500,000 $ 1,500,000
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ 1,500,000 $ - $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2025/26 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Wastewater
Project Description/Justification:

Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 107 of 112 ends

14.A

Page 249 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 7,500 7,500 $
Planning/Design $ 60,000 60,000 $
ROW $ -
Construction $ 622,500 622,500 $
CM/Inspection $ 60,000 60,000 $
Other $ -
Total Cost $ - - $ - $ - $ - $ 750,000 $ 750,000 $
MEASURE 'A' $ 750,000 750,000 $
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ - $ 750,000 $ 750,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2026/27 CITYWIDE SLURRY SEAL, LOCATIONS TBD
TBD
Public Works
Engineering
Project Description/Justification:

The project will provide slurry seal improvements to various streets within the City. The project will help the City maintain its roads by preventing these streets from further deteriorating.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 108 of 112 ends

14.A

Page 250 of 2213 ends

Project Number:

Category: Roads
Department:

Division:

Project Status:

Administration $ 20,000 20,000 $
Planning/Design $ 160,000 160,000 $
ROW $ -
Construction $ 1,660,000 1,660,000 $
CM/Inspection $ 160,000 160,000 $
Other $ -
Total Cost $ - - $ - $ - $ - $ 2,000,000 $ 2,000,000 $
MEASURE 'A' $ 2,000,000 2,000,000 $
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ - $ 2,000,000 $ 2,000,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2026/27 CITYWIDE PAVEMENT REHABILITATION, LOCATIONS TBD TBD
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation to various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 109 of 112 ends

14.A

Page 251 of 2213 ends

Project Number:

Category:

Department:

Division:

Project Status:

Administration $ 26,000 26,000 $
Planning/Design $ 208,000 208,000 $
ROW $ -
Construction $ 2,158,000 2,158,000 $
CM/Inspection $ 208,000 208,000 $
Other $ -
Total Cost $ - - $ - $ - $ - $ 2,600,000 $ 2,600,000 $
RMRA $ 2,600,000 2,600,000 $
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ - $ 2,600,000 $ 2,600,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2026/27 SB1 PAVEMENT REHABILITATION, LOCATIONS TBD
TBD
Roads
Public Works
Engineering
Project Description/Justification:

The project will provide rehabilitation of various streets within the City. The rehabilitation of these streets will provide vehicle safety and help the City maintain its roads.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24

PROJECTED
24/25

PROJECTED
25/26

PROJECTED
26/27

PROJECTED

PROJECTED

FUTURE YEARS

COST TO

COMPLETE
$ -

Page 110 of 112 ends

14.A

Page 252 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 15,000 $
Planning/Design $ 120,000 120,000 $
ROW $ -
Construction $ 1,245,000 1,245,000 $
CM/Inspection $ 120,000 120,000 $
Other $ -
Total Cost $ - - $ - $ - $ - $ 1,500,000 $ 1,500,000 $
WATER $ 1,500,000 1,500,000 $
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ - $ 1,500,000 $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2026/27 CITYWIDE WATER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Water
Project Description/Justification:

The project calls for the replacement of aging water mains. The project will allow the City to maintain its overall water system to mitigate against corrosion and health risks that come with aging water mains.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 111 of 112 ends

14.A

Page 253 of 2213 ends

Project Number:

Category: Infrastructure
Department:

Division:

Project Status:

Administration $ 15,000 15,000 $
Planning/Design $ 120,000 120,000 $
ROW $ -
Construction $ 1,245,000 1,245,000 $
CM/Inspection $ 120,000 120,000 $
Other $ -
Total Cost $ - - $ - $ - $ - $ 1,500,000 $ 1,500,000 $
SEWER $ 1,500,000 1,500,000 $
$ -
$ -
$ -
$ -
$ -
Total Cost $ - - $ - $ - $ - $ 1,500,000 $ 1,500,000 $

CAPITAL IMPROVEMENT PROGRAM
FY 2022/2023 - FY 2026/2027
2026/27 CITYWIDE SEWER MAIN REPLACEMENTS, LOCATIONS TBD TBD
Public Works
Wastewater
Project Description/Justification:

Reline, repair, or replace existing sewer main lines to provide adequate protection to the City's sewer infrastructure and to address areas previously identified as deteriorating or in need of serious maintenance. City runs the risk of the weakest points in infrastructure becoming in violation of State of CA and Riverside Public Health Department requirements. Failed infrastructure can result in system back ups and ground water contamination.

Planning

LOCATION MAP
Project Cost: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
COST

COMPLETE
$ -
Source of Funds: PREVIOUSLY

APPROPRIATED
22/23 NEW

REQUEST
23/24 NEW

REQUEST
24/25 NEW

REQUEST
25/26 NEW

REQUEST
26/27 NEW

REQUEST

PROJECTED

FUTURE YEARS
$ -
COST

COMPLETE

Page 112 of 112 ends

14.A

Page 254 of 2213 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Aug 09 2022
Department: Community Development
Submitted by: Eddie Pust, Interim City Manager
H. P. Kang, Community Development Director, Monique Alaniz-Flejter, Principal Planner;
☐ Receive and File ☐ Consent Calendar ☐ Business Item ☒ Public Hearing TITLE:

An Interim Urgency Ordinance of the City of Hemet, California, Extending Interim Urgency Ordinance No. 2022-2000 Establishing Temporary Emergency Sleeping Cabins, to June 28, 2023 RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

1. Open the Public Hearing and take testimony, if any; and,

2. Adopt an Interim Urgency Ordinance of the City of Hemet, California, Extending Interim Urgency Ordinance No. 2022-2000 Establishing Temporary Emergency Sleeping Cabins, to June 28, 2023.

DISCUSSION:

On June 28, 2022, the City Council adopted Interim Urgency Ordinance No. 2022-2000 (attached), which amended Chapter 90 of the Municipal Code to allow emergency sleeping cabins, during a shelter crisis, on-site(s) identified in subsection 90-303(b) as necessary to accommodate the city’s need for emergency shelter. The Interim Urgency Ordinance also adopted the 2019 California Building Code, Appendix O, and the 2019 California Residential Code, Appendix X.

As set forth in Government Code Section 65858, interim urgency ordinances must be extended by the legislative body, forty-five (45) days after adoption, to remain in effect. This item will extend the ordinance for 10 months and 15 days, for a total duration of one year.

The Staff Report from the original adoption is attached.

On July 28, 2022 public notice for this item was given pursuant to Government Code Section 65090.

STRATEGIC PLAN INTEGRATION:

Page 1 of 86 ends

14.B

Page 255 of 2213 ends

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 2: Explore and implement homelessness solutions for the City of Hemet.

FISCAL IMPACT:

No Fiscal Impact
ATTACHMENT(S):

Attachment No. 1 EXTENSION - Emergency Sleeping Cabins
Attachment No. 2 ORD_2022-2000 Authorizing the Establishment of Temporary Emergency Sleeping Cabins and Declaring the Ordinance to be an Emergency Measure to Take Effect Immediately Upon Adoption
Attachment No. 3 June 28, 2022 City Council Staff Report

Page 2 of 86 ends

14.B

Page 256 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx

CITY OF HEMET

HEMET, CALIFORNIA
ORDINANCE NO. 2022-

AN INTERIM URGENCY ORDINANCE

OF THE CITY OF HEMET,

CALIFORNIA, EXTENDING INTERIM
URGENCY ORDINANCE NO. 2022-
2000 ESTABLISHING TEMPORARY

EMERGENCY SLEEPING CABINS, TO
JUNE 28, 2023.

The City Council of the City of Hemet, California
(hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, on September 25, 2018, the City
Council adopted Resolution No. 4837, a resolution
declaring that a “shelter crisis” exists in the City of Hemet, pursuant to Government Code § 8698.2
(“Shelter Crisis Law”), because a significant number of persons in the City are without the ability to obtain
shelter and such condition has resulted in a threat to
the health and safety of those persons; and
WHEREAS, the 2022 Point in Time Count for the
County of Riverside identified eighty-two (82)
unsheltered individuals experiencing homelessness
within the City (“Unsheltered Persons”); and
WHEREAS, there are currently thirty-five (35)
shelter beds located throughout the City for different
subpopulations of individuals experiencing homeless,
thirty-five (35) of which are located at 200 E. Menlo
Avenue, a site operated by Valley Restart Shelter, Inc., a California nonprofit corporation (hereafter “Valley
Restart Campus”); and
WHEREAS, Valley Restart Shelter, Inc. is
working towards the development of an alternative
temporary housing model to augment the supply of
currently available shelter beds at the Valley Restart
Campus; and

Page 3 of 86 ends

14.B

Page 257 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
WHEREAS, there still exists a need for
additional shelter beds as the number of beds currently available is insufficient for the number of Unsheltered Persons identified in the 2022 Point in Time Count in
the City; and
WHEREAS, Unsheltered Persons frequently
occupy public spaces and other places not meant for
human habitation, which poses a significant threat to
the health and safety of these Unsheltered Persons
who are already vulnerable to illness, crime,
malnutrition, and harmful weather exposures (such as
excessive heat, excessive cold, rain, and flooding); and WHEREAS, to preserve life, health, and
property, there is a need to provide Unsheltered
Persons with temporary shelter and overnight sleeping
accommodations; and
WHEREAS, the purpose of this ordinance is to
provide a process by which the City can review and
authorize the establishment of temporary emergency
sleeping cabins that meet certain health and safety
standards, for the duration of the shelter crisis; and
WHEREAS, the City of Hemet, pursuant to its
police power, may adopt regulations to protect the
health, safety, and welfare of the public under California Constitution, Article XI, Section 7 and California
Government Code § 37100, and thereby is authorized
to establish land use regulations that promote orderly
development and protect the health and safety of
residents; and
WHEREAS, in exercising its inherent police
power, the City may not enact or enforce laws or
ordinances that conflict with the state’s general laws, either expressly or by legislative implication; and
WHEREAS, on September 25, 2020, the
Governor signed Assembly Bill 2553 (Ting and
Berman), which expanded the Shelter Crisis Law,
giving cities additional flexibility to tackle the homeless crisis and to provide additional shelter options to
individuals experiencing homelessness. In particular,
the law allows local jurisdictions to adopt reasonable
local standards for emergency housing that, at a
minimum, meet the standards provided in the 2019

Page 4 of 86 ends

14.B

Page 258 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
California Residential Code Appendix X and the
California Building Code Appendix O; and
WHEREAS, strict compliance with current
building standards would prevent, hinder, and delay the mitigation of the effects of the shelter crisis,
necessitating the immediate adoption of the emergency
housing standards set forth in 2019 California
Residential Code Appendix X and the California
Building Code Appendix O, as amended herein; and
WHEREAS, on June 28, 2022, the City Council
adopted Interim Urgency Ordinance No. 2022 -2000
which amended Chapter 90 of the Hemet Municipal
Code to allow emergency sleeping cabins, during a
shelter crisis, on site(s) identified in subsection 90- 303(b) as necessary to accommodate the city’s need
for emergency shelter (“Interim Urgency Ordinance”).

The Interim Urgency Ordinance also adopted the 2019
California Building Code, Appendix O, and the 2019
California Residential Code, Appendix X; and
WHEREAS, on July 28, 2022 a public notice was
published for the August 9, 2022 City Council Meeting
to consider extending the Interim Urgency Ordinance;
and
WHEREAS, California Government Code
Section 65858 authorizes the City to extend an urgency
measure by a four-fifths (4/5ths) vote where necessary
to protect the public health, safety, and welfare; and
WHEREAS, the extension of the Interim Urgency
Ordinance is necessary to protect public health and
safety, and it is also necessary to provide sufficient time for the City to study ways to improve shelter options for Unsheltered Persons; and
WHEREAS, with this extension, the Interim
Urgency Ordinance shall expire on June 28, 2023.

NOW, THEREFORE, THE CITY COUNCIL OF

THE CITY OF HEMET FINDS, DETERMINES,
ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1. The above recitals are all true
and correct.

Page 5 of 86 ends

14.B

Page 259 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
SECTION 2. This extension of the Interim
Urgency Ordinance is adopted as an urgency measure
pursuant to the authority granted the City of Hemet
under Government Code § 36934 and is for the
immediate preservation of the public safety, health, and welfare. The facts constituting urgency are:
(A) The 2022 Point in Time Count for the
County of Riverside identified eighty-two
(82) unsheltered individuals
experiencing homelessness within the
City (“Unsheltered Persons”); and
(B) There are currently thirty-five (35)
shelter beds located throughout the City
for different subpopulations of
individuals experiencing homeless; and
(C)There still exists a need for additional
shelter beds as the number of beds
currently available is insufficient for the
number of Unsheltered Persons
identified in the 2022 Point in Time
Count in the City; and
(D)Unsheltered Persons frequently occupy
public spaces and other places not
meant for human habitation, which
poses a significant threat to the health
and safety of these Unsheltered
Persons who are already vulnerable to
illness, crime, malnutrition, and harmful
weather exposures (such as excessive
heat, excessive cold, rain, and flooding);
and
(E) To preserve life, health, and property,
there is a need to provide Unsheltered
Persons with temporary shelter and
overnight sleeping accommodations;
and
(F) The purpose of this ordinance is to
provide a process by which the City can
review and authorize the establishment
of temporary emergency sleeping
cabins that meet certain health and

Page 6 of 86 ends

14.B

Page 260 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
safety standards, for the duration of the
shelter crisis; and
(G)The City of Hemet, pursuant to its police
power, may adopt regulations to protect
the health, safety, and welfare of the
public under California Constitution,
Article XI, Section 7 and California
Government Code § 37100, and thereby
is authorized to establish land use
regulations that promote orderly
development and protect the health and
safety of residents; and
(H)On September 25, 2020, the Governor
signed Assembly Bill 2553 (Ting and
Berman), which expanded the Shelter
Crisis Law, giving cities additional
flexibility to tackle the homeless crisis
and to provide additional shelter options
to individuals experiencing
homelessness. In particular, the law
allows local jurisdictions to adopt
reasonable local standards for
emergency housing that, at a minimum,
meet the standards provided in the 2019
California Residential Code Appendix X
and the California Building Code
Appendix O; and
(I) Strict compliance with current building
standards would prevent, hinder, and
delay the mitigation of the effects of the
shelter crisis, necessitating the
immediate adoption of the emergency
housing standards set forth in 2019
California Residential Code Appendix X
and the California Building Code
Appendix O, as amended herein; and
(J) The adoption of this ordinance as an
interim urgency ordinance is necessary
to protect public health and safety, and it
is also necessary to ensure compliance
with state law.

SECTION 3. The City Council hereby declares
that should any section, paragraph, sentence, phrase,

Page 7 of 86 ends

14.B

Page 261 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
term or word of this ordinance be declared for any
reason to be invalid, it is the intent of the City Council that it would have adopted all other portions of this
ordinance independent of the elimination herefrom of
any such portion as may be declared invalid. If any
section, subdivision, paragraph, sentence, clause, or
phrase of this ordinance is for any reason held to be
invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance.

The City Council hereby declares that it would have
passed this ordinance, and each section, subdivision,
paragraph, sentence, clause and phrase thereof,
irrespective of the fact that anyone (or more) section, subdivision, paragraph, sentence, clause or phrase had
been declared invalid or unconstitutional.

SECTION 4. The City Council finds and
determines that, pursuant to Government Code §§
65852.21 and 66411.7, this ordinance is not subject to
the California Environmental Quality Act (“CEQA”),
Division 13, commencing with Section 21000 of the
Public Resources Code, because it is not a project as
defined in Section 15378 of the CEQA Guidelines (Title
14, Chapter 3 of the California Code of Regulations).

The ordinance is also exempt from review under CEQA
Guidelines § 15269(c) as it is an action “necessary to
prevent or mitigate an emergency.” Specifically, the
proposed ordinance is designed to mitigate the City’s
shelter crisis, as declared by the City Council on
September 25, 2018 (Resolution No. 4837) under
Government Code § 8698 et seq. In declaring a shelter
crisis, the City, consistent with the law, found that a significant number of persons within the jurisdiction are without the ability to obtain shelter, resulting in a threat to their health and safety. Lastly, the proposed
ordinance is also exempt from CEQA review under
various categorical exemptions including CEQA
Guidelines §§ 15303(c) (related to new construction or
conversion of small structures), 15304(e) (related to the temporary use of land having negligible or no
permanent effects on the environment), and 15311
(related to accessory structures). The proposed
ordinance authorizes the temporary expansion,
establishment, and operation of emergency shelters
during—and only during—the shelter crisis emergency,
as declared by the City Council. The anticipated
improvements on the land to operate these shelters are

Page 8 of 86 ends

14.B

Page 262 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
small, limited, and temporary, and have negligible or no effects on the environment.

SECTION 5. Pursuant to Government Code
Section 65858, the Interim Urgency Ordinance is
hereby extended for ten (10) months and fifteen (15)
days from the date of this duly noticed public hearing, and shall expire on June 28, 2023.

SECTION 6. In accordance with Section 36934
of the Government Code, this Ordinance shall become
effective immediately upon adoption if adopted by at
least a four-fifths vote of the City Council. The City
Clerk shall cause this ordinance to be posted in at least three (3) public places in the City of Hemet in
accordance with Section 36933 of the Government
Code.

PASSED, APPROVED AND ADOPTED this
____ day of ___________ 2022.
____________________________
Malcolm Lilienthal, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk

Page 9 of 86 ends

14.B

Page 263 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of
Hemet, do hereby certify that the foregoing ordinance
was adopted by the Hemet City Council on the ___
day of ______ 2022, and was passed by the following
vote:

AYES: Council Members: None.

NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.
____________________________
John Paul Maier, City Clerk

Page 10 of 86 ends

14.B

Page 264 of 2213 ends
Page 11 of 86 ends

14.B

Page 265 of 2213 ends

2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 E: 3
19 20
21 22
23 24
25 26
27 28

CITY OF HEMET

HEMET, CALIFORNIA
URGENCY ORDINANCE NO. 2022- 2000

AN URGENCY ORDINANCE OF THE CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA, AUTHORIZING THE ESTABLISHMENT

OF TEMPORARY EMERGENCY SLEEPING CABINS AND

DECLARING THE ORDINANCE TO BE AN EMERGENCY MEASURE

TO TAKE EFFECT IMMEDIATELY UPON ADOPTION
The City Council of the City of Hemet, California ( hereafter referred to as the " City Council") does resolve as follows:

WHEREAS, on September 25, 2018, the City Council adopted Resolution No. 4837, a resolution declaring that a " shelter crisis" exists in the City of Hemet, pursuant to Government Code § 8698. 2 (" Shelter Crisis Law"), because a significant number of persons in the City are without the ability to obtain shelter and such condition has resulted in a threat to the health and safety of those persons; and WHEREAS, the 2022 Point in Time Count for the County of Riverside identified eighty- two ( 82) unsheltered individuals experiencing homelessness within the City Unsheltered Persons"); and
WHEREAS, there are currently thirty- five ( 35) shelter beds located throughout the City for different subpopulations of individuals experiencing homeless, thirty-five 35) of which are located at 200 E. Menlo Avenue, a site operated by Valley Restart Shelter, Inc., a California nonprofit corporation ( hereafter "Valley Restart Campus"); and
WHEREAS, Valley Restart Shelter, Inc. is working towards the development of an alternative temporary housing model to augment the supply of currently available shelter beds at the Valley Restart Campus; and
WHEREAS, there still exists a need for additional shelter beds as the number of beds currently available is insufficient for the number of Unsheltered Persons identified in the 2022 Point in Time Count in the City; and WHEREAS, Unsheltered Persons frequently occupy public spaces and other places not meant for human habitation, which poses a significant threat to the health and safety of these Unsheltered Persons who are already vulnerable to illness, crime, malnutrition, and harmful weather exposures (such as excessive heat, excessive cold, rain, and flooding); and
CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 12 of 86

14.B

Page 266 of 2213 ends

1 WHEREAS, to preserve life, health, and property, there is a need to provide 2 Unsheltered Persons with temporary shelter and overnight sleeping accommodations; and
3 WHEREAS, the purpose of this ordinance is to provide a process by which the 4 City can review and authorize the establishment of temporary emergency sleeping cabins that meet certain health and safety standards, for the duration of the shelter 5 crisis; and
6 WHEREAS, the City of Hemet, pursuant to its police power, may adopt 7 regulations to protect the health, safety, and welfare of the public under California Constitution, Article XI, Section 7 and California Government Code § 37100, and 8 thereby is authorized to establish land use regulations that promote orderly development and protect the health and safety of residents; and 9 10
WHEREAS, in exercising its inherent police power, the City may not enact or enforce laws or ordinances that conflict with the state' s general laws, either expressly 11 or by legislative implication; and
12 WHEREAS, on September 25, 2020, the Governor signed Assembly Bill 2553 Ting and Berman), which expanded the Shelter Crisis Law, giving cities additional 13 flexibility to tackle the homeless crisis and to provide additional shelter options to 14 individuals experiencing homelessness. In particular, the law allows local jurisdictions to adopt reasonable local standards for emergency housing that, at a minimum, meet 15 the standards provided in the 2019 California Residential Code Appendix X and the California Building Code Appendix O; and
16 WHEREAS, strict compliance with current building standards would prevent, 17 hinder, and delay the mitigation of the effects of the shelter crisis, necessitating the 18 immediate adoption of the emergency housing standards set forth in 2019 California Residential Code Appendix X and the California Building Code Appendix O, as 19 amended herein; and
20 WHEREAS, the adoption of this ordinance as an interim urgency ordinance is necessary to protect public health and safety, and it is also necessary to ensure 21 compliance with state law; and
22 WHEREAS, following the adoption of this ordinance, the City will continue to 23 work with regional partners, including Valley Restart Shelter, Inc., to study ways to improve shelter options for Unsheltered Persons.
24 25

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HEMET FINDS, DETERMINES, ORDERS AND RESOLVES AS FOLLOWS:
26 SECTION 1. The above recitals are all true and correct. 27 SECTION 2. Chapter 90 of the Hemet Municipal Code is hereby amended to 28 add the following provision:

CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 13 of 86

14.B

Page 267 of 2213 ends

2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 B]
IK'
20 21
22 23
24 25
26 27
28 Sec. 90- 303. 5. Shelter Crisis.
a) Applicability. Notwithstanding any other requirements of this division, the following provisions shall only be effective for the duration of a shelter crisis, as declared by the City Council pursuant to Government Code § 8698. 2. Upon the expiration of the City' s shelter crisis declaration, or the repeal or expiration of this ordinance, the emergency shelter must immediately cease its expanded emergency sleeping cabin operations and immediately return the site to its previous condition. Approvals issued pursuant to this section are not property, have no value, and do not create vested rights or confer nonconforming status. b) Emergency sleeping cabins.
i) For purposes of this section 90- 303. 5, ` emergency sleeping cabin' shall mean a relocatable hard -sided structure, constructed in accordance with Chapter 14 - Article XIV of the Hemet Municipal Code, which may be occupied only for emergency shelter.
ii) For the duration of the shelter crisis, emergency sleeping cabins shall be allowed on the site(s) identified in subsection 90- 303( b) as necessary to accommodate the city' s need for emergency shelter pursuant to Government § 65583, provided the emergency sleeping cabins comply with all applicable building, health, and safety standards set forth herein. c) Site plan.
i) To establish emergency sleeping cabins, an emergency shelter provider shall submit to the City a site plan for the emergency sleeping cabins that complies with the standards set forth in Chapter 14 - Article XIV of the Hemet Municipal Code.
ii) To protect occupants in the event of an emergency, the site plan must also satisfy the following requirements:

A. A fire flow of 1, 500 gpm at 20 psi residual pressure shall be available from hydrants within 600 feet of the furthest point of any building; B. Approved fire apparatus access shall be within one hundred fifty 150) feet of any point of the building;
C. Fire Sprinklers designed to 2016 NFPA 13D may be required; D. The site shall conform to all pertinent requirements of the Americans with Disabilities Act ( https // www ada qov/ pcatoolkit/ chap7shelterchk. htm ;
CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 14 of 86

14.B

Page 268 of 2213 ends

1 E. At least one ( 1) accessible route shall be provided within the site from 2 accessible parking spaces and accessible parking loading zones, public streets and sidewalks, and public transportation stops, to the 3 accessible building or facility entrance they serve. If more than one ( 1) 4 route is provided, all routes must be accessible;
5 F. The site shall provide adequate space for emergency response vehicles; and
6 7
G. As part of the site plan, a building egress plan shall be provided to the Building Department for review and approval.
8 iii) A site plan must be approved prior to the establishment of emergency 9 sleeping cabins on a site. The City Manager, or his or her designee, shall have the ability to impose any and all site conditions necessary to ensure 10 the adequate protection of life, health, and property. 11 ( d) Management. Emergency sleeping cabin operators shall comply with the 12 development and management standards set forth in Sec. 90- 304 ( a), ( c) — (f), and ( h) — ( n), including the submission of an onsite management plan. A 13 management plan must be approved by the City prior to the establishment of emergency sleeping cabins on a site. The City Manager, or his or her designee, 14 shall have the ability to impose any and all management conditions necessary 15 to ensure the adequate protection of life, health, and property. 16 ( e) Inspection. The City shall have a right to inspect the site to ensure compliance with the requirements set forth herein.
17 18 (
f) Violations. Violations of this chapter include:
19 (
i) Operating emergency sleeping cabins without an approved site plan, or failing to operate emergency sleeping cabins in accordance with an 20 approved site plan, pursuant to Sec. 90- 303. 5( c); 21 ( ii) Operating emergency sleeping cabins without an approved management plan, or failing to operate emergency sleeping cabins in accordance with 22 an approved management plan, pursuant to Sec. 90- 303. 5( d); 23 iii) Failing to maintain facilities in good repair;
24 iv) Denying or otherwise interfering with the City' s inspection of the site 25 pursuant to Sec. 90- 303. 5( e);
26 ( v) Failing to abide by the management standards set forth in Sec. 90- 27 303. 5( d);
28 CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 15 of 86

14.B

Page 269 of 2213 ends

1 ( vi) Failing to comply with any other provision of the Hemet Municipal Code, 2 including those provisions in Chapter 30; and
3 ( vii) Failing to comply with state and local health, environmental, and safety standards.
4 g) Enforcement. In addition to other remedies allowed by law, any person who 5 violates this chapter or operates an unauthorized emergency sleeping cabin 6 facility may be subject to civil action, including ( but not limited to) a petition for the appointment of a receiver under California Health & Safety Code § 17980 et 7 seq., administrative penalties, criminal citation, and all other actions set forth in Article 1 of the Hemet Municipal Code. Violations of this chapter are hereby 8 declared a public nuisance. All remedies prescribed under this section shall be cumulative and the election of one or more remedies shall not bar the City from 9 the pursuit of any other remedy for the purpose of enforcing provisions hereof. 10 ( h) Sunset. The provisions set forth in this Sec. 90- 303. 5 and Chapter 14 - Article 11 XIV of the Hemet Municipal Code shall expire twelve ( 12) months after the effective date of this Ordinance, unless earlier extended by ordinance. The 12 provisions set forth herein are intended to be temporary, and the City Manager, or his or her designee, is hereby directed to study and develop a permanent 13 regulatory framework by which emergency sleeping cabins may be utilized 14 during the existence of a shelter crisis."
15 SECTION 3. Chapter 14, Article XIV, Emergency Housing, is hereby added to the Hemet Municipal Code:
16 ARTICLE I. — EMERGENCY HOUSING
17 18
Sec. 14- 560. Adoption of standards.
19 The 2019 California Building Code, Appendix O, and the 2019 California Residential Code, Appendix X, as such Codes may be amended from time to 20 time, are hereby adopted together with certain amendments, deletions, additions, and exceptions.
21 22
Sec. 14-570. Amendments.
23 Section 0101, General, is deleted in its entirety from the California Building Code, Appendix O, and replaced to read as follows:
24 Title. These regulations shall be known as the Emergency Housing Standards 25 of City of Hemet, hereinafter "Emergency Housing Standards." 26 101. 1 Scope. The provisions of this chapter shall apply only to those 27 emergency shelters identified in section 90- 303. 5 of the Hemet Municipal Code and shall only be effective for the duration of a shelter crisis, as declared by 28 the City Council of the City of Hemet pursuant to Government Code § 8698. 2.

CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 16 of 86

14.B

Page 270 of 2213 ends

1 Upon the expiration of the City' s shelter crisis declaration, or the repeal or 2 expiration of this ordinance, these Emergency Housing Standards shall terminate.
3 Section AX101, General, is deleted in its entirety from the California Residential 4 Code, Appendix X, and replaced to read as follows:
5 Title. These regulations shall be known as the Emergency Housing Standards 6 of City of Hemet, hereinafter " Emergency Housing Standards." 7 101. 1 Scope. The provisions of this chapter shall apply only to those emergency shelters identified in Section 90- 303. 5 of the Hemet Municipal 8 Code and shall only be effective for the duration of a shelter crisis, as declared by the City Council of the City of Hemet pursuant to Government Code § 9 8698. 2. Upon the expiration of the City' s shelter crisis declaration, or the repeal 10 or expiration of this ordinance, these Emergency Housing Standards shall terminate."
11 SECTION 4. The City Council hereby finds and declares that this ordinance is 12 adopted as an urgency measure pursuant to the authority granted the City of Hemet under Government Code § 36934 and is for the immediate preservation of the public 13 safety, health, and welfare. The facts constituting urgency are:
14 ( A) The 2022 Point in Time Count for the County of Riverside identified eighty- two 15 ( 82) unsheltered individuals experiencing homelessness within the City Unsheltered Persons"); and
16 17 (
B) There are currently thirty-five ( 35) shelter beds located throughout the City for different subpopulations of individuals experiencing homeless; and 18 C) There still exists a need for additional shelter beds as the number of beds 19 currently available is insufficient for the number of Unsheltered Persons identified in the 2022 Point in Time Count in the City; and 20 21 (
D) Unsheltered Persons frequently occupy public spaces and other places not meant for human habitation, which poses a significant threat to the health and 22 safety of these Unsheltered Persons who are already vulnerable to illness, crime, malnutrition, and harmful weather exposures ( such as excessive heat, 23 excessive cold, rain, and flooding); and
24 ( E) To preserve life, health, and property, there is a need to provide Unsheltered 25 Persons with temporary shelter and overnight sleeping accommodations; and 26 ( F) The purpose of this ordinance is to provide a process by which the City can review and authorize the establishment of temporary emergency sleeping 27 cabins that meet certain health and safety standards, for the duration of the shelter crisis; and
28 CITY COUNCIL ORDINANCE NO. 2022-2000 Page 17 of 86

14.B

Page 271 of 2213 ends

1 ( G) The City of Hemet, pursuant to its police power, may adopt regulations to protect 2 the health, safety, and welfare of the public under California Constitution, Article XI, Section 7 and California Government Code § 37100, and thereby is 3 authorized to establish land use regulations that promote orderly development and protect the health and safety of residents; and
4 H) On September 25, 2020, the Governor signed Assembly Bill 2553 ( Ting and 5 Berman), which expanded the Shelter Crisis Law, giving cities additional 6 flexibility to tackle the homeless crisis and to provide additional shelter options to individuals experiencing homelessness. In particular, the law allows local 7 jurisdictions to adopt reasonable local standards for emergency housing that, at a minimum, meet the standards provided in the 2019 California Residential 8 Code Appendix X and the California Building Code Appendix O; and 9 ( 1) Strict compliance with current building standards would prevent, hinder, and 10 delay the mitigation of the effects of the shelter crisis, necessitating the immediate adoption of the emergency housing standards set forth in 2019 11 California Residential Code Appendix X and the California Building Code Appendix O, as amended herein; and
12 J) The adoption of this ordinance as an interim urgency ordinance is necessary to 13 protect public health and safety, and it is also necessary to ensure compliance 14 with state law.
15 SECTION 5. The City Council hereby declares that should any section, paragraph, sentence, phrase, term or word of this ordinance be declared for any reason 16 to be invalid, it is the intent of the City Council that it would have adopted all other portions of this ordinance independent of the elimination herefrom of any such portion 17 as may be declared invalid. If any section, subdivision, paragraph, sentence, clause, 18 or phrase of this ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance. The 19 City Council hereby declares that it would have passed this ordinance, and each section, subdivision, paragraph, sentence, clause and phrase thereof, irrespective of 20 the fact that anyone ( or more) section, subdivision, paragraph, sentence, clause or phrase had been declared invalid or unconstitutional.
21 22
SECTION 6. The City Council finds and determines that, pursuant to Government Code §§ 65852. 21 and 66411. 7, this ordinance is not subject to the 23 California Environmental Quality Act ("CEQA"), Division 13, commencing with Section 21000 of the Public Resources Code, because it is not a project as defined in Section 24 15378 of the CEQA Guidelines ( Title 14, Chapter 3 of the California Code of Regulations). The ordinance is also exempt from review under CEQA Guidelines § 25 15269( c) as it is an action " necessary to prevent or mitigate an emergency." 26 Specifically, the proposed ordinance is designed to mitigate the City' s shelter crisis, as declared by the City Council on September 25, 2018 ( Resolution No. 4837) under 27 Government Code § 8698 et seq. In declaring a shelter crisis, the City, consistent with the law, found that a significant number of persons within the jurisdiction are without 28 1
the ability to obtain shelter, resulting in a threat to their health and safety. Lastly, the CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 18 of 86

14.B

Page 272 of 2213 ends

1 proposed ordinance is also exempt from CEQA review under various categorical 2 exemptions including CEQA Guidelines §§ 15303( c) ( related to new construction or conversion of small structures), 15304( e) ( related to the temporary use of land having 3 negligible or no permanent effects on the environment), and 15311 ( related to accessory structures). The proposed ordinance authorizes the temporary expansion, 4 establishment, and operation of emergency shelters during— and only during— the shelter crisis emergency, as declared by the City Council. The anticipated 5 improvements on the land to operate these shelters are small, limited, and temporary, 6 and have negligible or no effects on the environment. 7 SECTION 7. In accordance with Section 36934 of the Government Code, this Ordinance shall become effective immediately upon adoption if adopted by at least a 8 four-fifths vote of the City Council. The City Clerk shall cause this ordinance to be posted in at least three (3) public places in the City of Hemet in accordance with Section 9 36933 of the Government Code.
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 CITY COUNCIL ORDINANCE NO. 2022-2000 Page 19 of 86

14.B

Page 273 of 2213 ends

1 PASSED, APPROVED AND ADOPTED this 28th day of June, 2022. 2 v..
4 Malcolm Lilienthal, Mayor
6 7 ATTEST:
8 10
John Paul Maier, City Clerk
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
CITY COUNCIL ORDINANCE NO. 2022- 2000 Page 20 of 86

14.B

Page 274 of 2213 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
State of California )
County of Riverside )
City of Hemet )
I, John Paul Maier, City Clerk of the City of Hemet, do hereby certify that the foregoing Ordinance is the actual Ordinance adopted by the City Council of the City of Hemet and was passed at a regular meeting of the City Council on the 28th day of June, 2022.

AYES: Council Members: Brown, Krupa, Males, Mayor Pro Tem Meyer, Mayor Lilienthal
NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.

John Paul Maier, -City Clerk
CITY COUNCIL ORDINANCE NO. 2022- 2000

Page 21 of 86 ends

14.B

Page 275 of 2213 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Jun 28 2022
Department: City Council
Submitted by: Eddie Pust, Acting City Manager
H. P. Kang, Community Development Director, Monique Alaniz-Flejter, Principal Planner;
☐ Receive and File ☐ Consent Calendar ☐ Business Item ☐ Public Hearing TITLE:

Interim Urgency Ordinance of the City Council of the City of Hemet, California, Authorizing Establishment of Temporary Emergency Shelters and Declaring the Ordinance to be an Emergency Measure to take Effect Immediately upon Adoption
RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

1. Open the Public Hearing and take testimony, if any; and

2. Introduce, read by title only, and waive further reading of an Urgency Ordinance of the City Council of the City of Hemet, California, an Interim Urgency Ordinance Authorizing the Establishment of Temporary Emergency Shelters and Declaring the Ordinance to be an Emergency Measure to take effect immediately upon adoption.

3. Direct staff to prepare a Zoning Code Amendment to Section 90-303 for Emergency Shelters to allow an increase to the permanent bed capacity at Valley Restart; and

4. Direct staff to prepare a Zoning Code Amendment to Section 90-73 of the Zoning Code for Temporary Uses to include Emergency Sleeping Cabins at the Valley Restart facility, and/or to make any other changes necessary to formalize minimum development criteria, maintenance responsibility, and operations, consistent with Shelter Crisis Law.

BACKGROUND:

On September 25, 2018, the City Council adopted Resolution No. 4837, a resolution declaring that a “shelter crisis” exists in the City of Hemet, pursuant to Government Code Section 8698.2 (“Shelter Crisis Law”), because a significant number of persons in the City are without the ability to obtain shelter and such condition has resulted in a threat to the health and safety of those persons.

On September 25, 2020, the Governor signed Assembly Bill 2553 (Ting and Berman), which expanded the Shelter Crisis Law, giving cities additional flexibility to tackle the homeless crisis and to provide additional shelter options to individuals experiencing homelessness. In particular, the law allows local jurisdictions to adopt reasonable local standards for emergency housing that, at a minimum, meet the

Page 1 of 65 ends

14.B

Page 276 of 2213 ends

standards provided in the 2019 California Residential Code Appendix X and the California Building Code Appendix O.

Valley Restart is requesting approval to install Palette Shelter Village Homes (Emergency Sleeping Cabins) to serve the homeless population within the City. These cabins provide an immediate and inexpensive housing alternative while transitioning to permanent housing. Additionally, Valley Restart has obtained a grant for the development through State Emergency Solutions Grant ProgramCoronavirus (ESG-CV) program. Currently, the Zoning Code and the Building Code does not address this type of emergency housing.

At the May 10, 2022 City Council meeting staff presented a work study of the following alternatives for the establishment of Palette Shelter Homes at the Valley Restart facility. At that meeting staff was directed to proceed with an option that would allow Palette Shelter Homes at the Valley Restart facility on a temporary trial basis as needed based on state legislation concerning shelter crisis law.

ANALYSIS:

Valley Restart is requesting approval to install Palette Shelter Village Homes (PSV) and associated Community Bathrooms and Showers. As illustrated below, the Palette Shelter Home proposed is a premanufactured aluminum product totaling 64 square feet and includes storage shelves, two (2) sleeping bunks per unit, air conditioning and heat. The bathrooms would include door locks, showers, toilets, wash station, air-conditioning, fan, power outlets and towel racks. The initial phase involves installation of six (6) palette homes with the potential for expansion in the future.

Source: Palletshelter.com/build-a-village/

Page 2 of 65 ends

14.B

Page 277 of 2213 ends

Source: The Orion, News Editor Ava Norgrove February 6, 2022 DISCUSSION:

At the May 10, 2022 City Council meeting staff presented a work study of the following alternatives for the establishment of Palette Shelter Homes at the Valley Restart facility. At that meeting staff was directed to proceed with an option that would allow Palette Shelter Homes at the Valley Restart facility on a temporary trial basis as needed.

Site Development Criteria

Page 3 of 65 ends

14.B

Page 278 of 2213 ends

For the duration of the shelter crisis, emergency sleeping cabins shall be allowed at the Valley Restart facility to accommodate the city’s need for emergency shelter pursuant to Government § 65583, provided the emergency sleeping cabins comply with all applicable building, health, and safety standards established by this ordinance. A plan must be submitted to the City that complies with the following:
• A fire flow of 1,500 gpm at 20 psi residual pressure shall be available from hydrants within 600 feet of the furthest point of any building;
• Approved fire apparatus access shall be within one hundred fifty (150) feet of any point of the building;
• Fire Sprinklers designed to 2016 NFPA 13D may be required; • At least one (1) accessible route shall be provided within the site from accessible parking spaces and accessible parking loading zones, public streets and sidewalks, and public transportation stops, to the accessible building or facility entrance they serve. If more than one (1) route is provided, all routes must be accessible;
• The site shall conform to all pertinent requirements of the Americans with Disabilities Act (https://www.ada.gov/pcatoolkit/chap7shelterchk. htm);
• The site shall provide adequate space for emergency response vehicles; and • As part of the site plan, a building egress plan shall be provided to the Building Department for review and approval.
• A site plan must be approved prior to the establishment of emergency sleeping cabins on a site.

The City Manager, or his or her designee, shall have the ability to impose any and all site conditions necessary to ensure the adequate protection of life, health, and property. • Operations Management Plan shall be reviewed for approval. • The City shall have the right to inspect site to ensure compliance. • Facilities must be maintained in good repair
Sunset of Ordinance
It is recommended that the proposed Ordinance expire within twelve (12) months from the effective date of adoption, unless extended by the Council. This provides the Council to evaluate the progress and success of the pilot program, as well as adjust operational health and safety criteria as necessary.

It is the intent that this ordinance would remain in effect for the duration of the shelter crisis. Upon the expiration of the City’s shelter crisis declaration, or the repeal or expiration of this ordinance, the emergency shelter must immediately cease its expanded emergency sleeping cabin operations and immediately return the site to its previous condition.

Zoning Code Amendment Updates
In the interim, it is recommended that Council direct staff to prepare a zoning code amendment to follow this action:

1. Direct staff to prepare a Zoning Code Amendment to Section 90-303 for Emergency Shelters to allow an increase to the permanent bed capacity at Valley Restart. Pursuant to Section 90-303 of the Hemet Municipal Code, which was adopted in 2013 (Ordinance 2013-1867), Valley Restart Shelter is permitted in the C-1 zone by right unless the building is expanded, exceeds a capacity of 35 beds nightly. The zoning code update would provide opportunity for a permanent solution to individual experiencing homelessness in the City.

2. Direct staff to prepare an Zoning Code Amendment to Section 90-73 of the Zoning Code for Temporary Uses to include Emergency Sleeping Cabins at the Valley Restart facility. This option would allow staff to formalize minimum development criteria, maintenance responsibility and operations, and provisions that aligns with Shelter Crisis Law.

Page 4 of 65 ends

14.B

Page 279 of 2213 ends

STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

Objective 2: Explore and implement homelessness solutions for the City of Hemet.

FISCAL IMPACT:

None
ATTACHMENT(S):

Attachment No. 1 Pallet Shelter Ordinance
Attachment No. 2 Letter from Applicant
Attachment No. 3 Conceptual Plans
CC_RESO_2018-04837 Shelter Crisis Senate Bill 850 GC 8698.2 CC_RESO_1996-03203 Establishes policy for operation of emergency shelters and transitional housing facilities in City

Page 5 of 65 ends

14.B

Page 280 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx

CITY OF HEMET

HEMET, CALIFORNIA
ORDINANCE NO. 2022-xxx

AN INTERIM URGENCY ORDINANCE

AUTHORIZING THE ESTABLISHMENT

OF TEMPORARY EMERGENCY

SLEEPING CABINS AND DECLARING

THE ORDINANCE TO BE AN

EMERGENCY MEASURE TO TAKE

EFFECT IMMEDIATELY UPON

ADOPTION
The City Council of the City of Hemet, California
(hereafter referred to as the “City Council”) does resolve as follows:

WHEREAS, on September 25, 2018, the City
Council adopted Resolution No. 4837, a resolution
declaring that a “shelter crisis” exists in the City of Hemet, pursuant to Government Code § 8698.2
(“Shelter Crisis Law”), because a significant number of persons in the City are without the ability to obtain
shelter and such condition has resulted in a threat to
the health and safety of those persons; and
WHEREAS, the 2022 Point in Time Count for the
County of Riverside identified eighty-two (82)
unsheltered individuals experiencing homelessness
within the City (“Unsheltered Persons”); and
WHEREAS, there are currently thirty-five (35)
shelter beds located throughout the City for different
subpopulations of individuals experiencing homeless,
thirty-five (35) of which are located at 200 E. Menlo
Avenue, a site operated by Valley Restart Shelter, Inc., a California nonprofit corporation (hereafter “Valley
Restart Campus”); and
WHEREAS, Valley Restart Shelter, Inc. is
working towards the development of an alternative
temporary housing model to augment the supply of
currently available shelter beds at the Valley Restart
Campus; and

Page 6 of 65 ends

14.B

Page 281 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
WHEREAS, there still exists a need for
additional shelter beds as the number of beds currently available is insufficient for the number of Unsheltered Persons identified in the 2022 Point in Time Count in
the City; and
WHEREAS, Unsheltered Persons frequently
occupy public spaces and other places not meant for
human habitation, which poses a significant threat to
the health and safety of these Unsheltered Persons
who are already vulnerable to illness, crime,
malnutrition, and harmful weather exposures (such as
excessive heat, excessive cold, rain, and flooding); and WHEREAS, to preserve life, health, and
property, there is a need to provide Unsheltered
Persons with temporary shelter and overnight sleeping
accommodations; and
WHEREAS, the purpose of this ordinance is to
provide a process by which the City can review and
authorize the establishment of temporary emergency
sleeping cabins that meet certain health and safety
standards, for the duration of the shelter crisis; and
WHEREAS, the City of Hemet, pursuant to its
police power, may adopt regulations to protect the
health, safety, and welfare of the public under California Constitution, Article XI, Section 7 and California
Government Code § 37100, and thereby is authorized
to establish land use regulations that promote orderly
development and protect the health and safety of
residents; and
WHEREAS, in exercising its inherent police
power, the City may not enact or enforce laws or
ordinances that conflict with the state’s general laws, either expressly or by legislative implication; and
WHEREAS, on September 25, 2020, the
Governor signed Assembly Bill 2553 (Ting and
Berman), which expanded the Shelter Crisis Law,
giving cities additional flexibility to tackle the homeless crisis and to provide additional shelter options to
individuals experiencing homelessness. In particular,
the law allows local jurisdictions to adopt reasonable
local standards for emergency housing that, at a

Page 7 of 65 ends

14.B

Page 282 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
minimum, meet the standards provided in the 2019
California Residential Code Appendix X and the
California Building Code Appendix O; and
WHEREAS, strict compliance with current
building standards would prevent, hinder, and delay the mitigation of the effects of the shelter crisis,
necessitating the immediate adoption of the emergency
housing standards set forth in 2019 California
Residential Code Appendix X and the California
Building Code Appendix O, as amended herein; and
WHEREAS, the adoption of this ordinance as an
interim urgency ordinance is necessary to protect public health and safety, and it is also necessary to ensure
compliance with state law; and
WHEREAS, following the adoption of this
ordinance, the City will continue to work with regional partners, including Valley Restart Shelter, Inc., to study ways to improve shelter options for Unsheltered
Persons.

NOW, THEREFORE, THE CITY COUNCIL OF

THE CITY OF HEMET FINDS, DETERMINES,
ORDERS AND RESOLVES AS FOLLOWS:

SECTION 1. The above recitals are all true
and correct.

SECTION 2. Chapter 90 of the Hemet
Municipal Code is hereby amended to add the following
provision:
“Sec. 90-303.5. Shelter Crisis.
(a) Applicability. Notwithstanding any other
requirements of this division, the
following provisions shall only be
effective for the duration of a shelter
crisis, as declared by the City Council
pursuant to Government Code § 8698.2.

Upon the expiration of the City’s shelter
crisis declaration, or the repeal or
expiration of this ordinance, the
emergency shelter must immediately
cease its expanded emergency sleeping
cabin operations and immediately return

Page 8 of 65 ends

14.B

Page 283 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
the site to its previous condition.

Approvals issued pursuant to this
section are not property, have no value,
and do not create vested rights or confer
nonconforming status.
(b) Emergency sleeping cabins.
(i) For purposes of this section 90-
303.5, ‘emergency sleeping
cabin’ shall mean a relocatable
hard-sided structure, constructed
in accordance with Chapter 14 -
Article XIV of the Hemet
Municipal Code, which may be
occupied only for emergency
shelter.
(ii) For the duration of the shelter
crisis, emergency sleeping cabins
shall be allowed on the site(s)
identified in subsection 90-303(b)
as necessary to accommodate
the city’s need for emergency
shelter pursuant to Government §
65583, provided the emergency
sleeping cabins comply with all
applicable building, health, and
safety standards set forth herein.
(c) Site plan.
(i) To establish emergency sleeping
cabins, an emergency shelter
provider shall submit to the City a
site plan for the emergency
sleeping cabins that complies
with the standards set forth in
Chapter 14 - Article XIV of the
Hemet Municipal Code.
(ii) To protect occupants in the event
of an emergency, the site plan
must also satisfy the following
requirements:

Page 9 of 65 ends

14.B

Page 284 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
A. A fire flow of 1,500 gpm at
20 psi residual pressure shall
be available from hydrants
within 600 feet of the furthest
point of any building;
B. Approved fire apparatus
access shall be within one
hundred fifty (150) feet of any
point of the building;
C. Fire Sprinklers designed to
2016 NFPA 13D may be
required;
D. The site shall conform to
all pertinent requirements of
the Americans with
Disabilities Act

Page 10 of 65 ends

14.B

Page 285 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
(https://www.ada.gov/pcatoolkit/chap7 Page 11 of 65 Page 32 of 86

14.B

Page 286 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
shelterchk. htm);
E. At least one (1) accessible
route shall be provided within
the site from accessible
parking spaces and
accessible parking loading
zones, public streets and
sidewalks, and public
transportation stops, to the
accessible building or facility
entrance they serve. If more
than one (1) route is provided,
all routes must be accessible;
F. The site shall provide
adequate space for
emergency response
vehicles; and
G. As part of the site plan, a
building egress plan shall be
provided to the Building
Department for review and
approval.
(iii) A site plan must be approved
prior to the establishment of
emergency sleeping cabins on a
site. The City Manager, or his or
her designee, shall have the
ability to impose any and all site
conditions necessary to ensure
the adequate protection of life,
health, and property.
(d) Management. Emergency sleeping
cabin operators shall comply with the
development and management
standards set forth in Sec. 90-304 (a),
(c) – (f), and (h) – (n), including the
submission of an onsite management
plan. A management plan must be

Page 12 of 65 ends

14.B

Page 287 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
approved by the City prior to the
establishment of emergency sleeping
cabins on a site. The City Manager, or
his or her designee, shall have the
ability to impose any and all
management conditions necessary to
ensure the adequate protection of life,
health, and property.
(e) Inspection. The City shall have a right to
inspect the site to ensure compliance
with the requirements set forth herein.
(f) Violations. Violations of this chapter
include:
(i) Operating emergency sleeping
cabins without an approved site
plan, or failing to operate
emergency sleeping cabins in
accordance with an approved site
plan, pursuant to Sec. 90-
303.5(c);
(ii) Operating emergency sleeping
cabins without an approved
management plan, or failing to
operate emergency sleeping
cabins in accordance with an
approved management plan,
pursuant to Sec. 90-303.5(d);
(iii) Failing to maintain facilities in
good repair;
(iv) Denying or otherwise interfering
with the City’s inspection of the
site pursuant to Sec. 90-303.5(e);
(v) Failing to abide by the
management standards set forth
in Sec. 90-303.5(d);
(vi) Failing to comply with any other
provision of the Hemet Municipal
Code, including those provisions
in Chapter 30; and

Page 13 of 65 ends

14.B

Page 288 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
(vii) Failing to comply with state and
local health, environmental, and
safety standards.
(g) Enforcement. In addition to other
remedies allowed by law, any person
who violates this chapter or operates an
unauthorized emergency sleeping cabin
facility may be subject to civil action,
including (but not limited to) a petition
for the appointment of a receiver under
California Health & Safety Code §
17980 et seq., administrative penalties,
criminal citation, and all other actions
set forth in Article 1 of the Hemet
Municipal Code. Violations of this
chapter are hereby declared a public
nuisance. All remedies prescribed under
this section shall be cumulative and the
election of one or more remedies shall
not bar the City from the pursuit of any
other remedy for the purpose of
enforcing provisions hereof.
(h) Sunset. The provisions set forth in this
Sec. 90-303.5 and Chapter 14 - Article
XIV of the Hemet Municipal Code shall
expire twelve (12) months after the
effective date of this Ordinance, unless
earlier extended by ordinance. The
provisions set forth herein are intended
to be temporary, and the City Manager,
or his or her designee, is hereby
directed to study and develop a
permanent regulatory framework by
which emergency sleeping cabins may
be utilized during the existence of a
shelter crisis.”
SECTION 3. Chapter 14, Article XIV, Emergency
Housing, is hereby added to the Hemet Municipal
Code:
“ARTICLE I. – EMERGENCY HOUSING
Sec. 14-560. Adoption of standards.

Page 14 of 65 ends

14.B

Page 289 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
The 2019 California Building Code, Appendix O,
and the 2019 California Residential Code,
Appendix X, as such Codes may be amended
from time to time, are hereby adopted together
with certain amendments, deletions, additions,
and exceptions.

Sec. 14-570. Amendments.

Section O101, General, is deleted in its entirety
from the California Building Code, Appendix O,
and replaced to read as follows:

Title. These regulations shall be known as the
Emergency Housing Standards of City of
Hemet, hereinafter “Emergency Housing
Standards.”
101.1 Scope. The provisions of this chapter
shall apply only to those emergency shelters
identified in section 90-303.5 of the Hemet
Municipal Code and shall only be effective for
the duration of a shelter crisis, as declared by
the City Council of the City of Hemet pursuant
to Government Code § 8698.2. Upon the
expiration of the City’s shelter crisis declaration,
or the repeal or expiration of this ordinance,
these Emergency Housing Standards shall
terminate.

Section AX101, General, is deleted in its entirety
from the California Residential Code, Appendix
X, and replaced to read as follows:

Title. These regulations shall be known as the
Emergency Housing Standards of City of
Hemet, hereinafter “Emergency Housing
Standards.”
101.1 Scope. The provisions of this chapter
shall apply only to those emergency shelters
identified in Section 90-303.5 of the Hemet
Municipal Code and shall only be effective for
the duration of a shelter crisis, as declared by
the City Council of the City of Hemet pursuant
to Government Code § 8698.2. Upon the
expiration of the City’s shelter crisis declaration,
or the repeal or expiration of this ordinance,

Page 15 of 65 ends

14.B

Page 290 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
these Emergency Housing Standards shall
terminate.”
SECTION 4. The City Council hereby finds and
declares that this ordinance is adopted as an urgency
measure pursuant to the authority granted the City of
Hemet under Government Code § 36934 and is for the
immediate preservation of the public safety, health, and welfare. The facts constituting urgency are:
(A) The 2022 Point in Time Count for the
County of Riverside identified eighty-two
(82) unsheltered individuals
experiencing homelessness within the
City (“Unsheltered Persons”); and
(B) There are currently thirty-five (35)
shelter beds located throughout the City
for different subpopulations of
individuals experiencing homeless; and
(C)There still exists a need for additional
shelter beds as the number of beds
currently available is insufficient for the
number of Unsheltered Persons
identified in the 2022 Point in Time
Count in the City; and
(D)Unsheltered Persons frequently occupy
public spaces and other places not
meant for human habitation, which
poses a significant threat to the health
and safety of these Unsheltered
Persons who are already vulnerable to
illness, crime, malnutrition, and harmful
weather exposures (such as excessive
heat, excessive cold, rain, and flooding);
and
(E) To preserve life, health, and property,
there is a need to provide Unsheltered
Persons with temporary shelter and
overnight sleeping accommodations;
and
(F) The purpose of this ordinance is to
provide a process by which the City can
review and authorize the establishment

Page 16 of 65 ends

14.B

Page 291 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
of temporary emergency sleeping
cabins that meet certain health and
safety standards, for the duration of the
shelter crisis; and
(G)The City of Hemet, pursuant to its police
power, may adopt regulations to protect
the health, safety, and welfare of the
public under California Constitution,
Article XI, Section 7 and California
Government Code § 37100, and thereby
is authorized to establish land use
regulations that promote orderly
development and protect the health and
safety of residents; and
(H)On September 25, 2020, the Governor
signed Assembly Bill 2553 (Ting and
Berman), which expanded the Shelter
Crisis Law, giving cities additional
flexibility to tackle the homeless crisis
and to provide additional shelter options
to individuals experiencing
homelessness. In particular, the law
allows local jurisdictions to adopt
reasonable local standards for
emergency housing that, at a minimum,
meet the standards provided in the 2019
California Residential Code Appendix X
and the California Building Code
Appendix O; and
(I) Strict compliance with current building
standards would prevent, hinder, and
delay the mitigation of the effects of the
shelter crisis, necessitating the
immediate adoption of the emergency
housing standards set forth in 2019
California Residential Code Appendix X
and the California Building Code
Appendix O, as amended herein; and
(J) The adoption of this ordinance as an
interim urgency ordinance is necessary
to protect public health and safety, and it
is also necessary to ensure compliance
with state law.

Page 17 of 65 ends

14.B

Page 292 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
SECTION 5. The City Council hereby declares
that should any section, paragraph, sentence, phrase,
term or word of this ordinance be declared for any
reason to be invalid, it is the intent of the City Council that it would have adopted all other portions of this
ordinance independent of the elimination herefrom of
any such portion as may be declared invalid. If any
section, subdivision, paragraph, sentence, clause, or
phrase of this ordinance is for any reason held to be
invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this ordinance.

The City Council hereby declares that it would have
passed this ordinance, and each section, subdivision,
paragraph, sentence, clause and phrase thereof,
irrespective of the fact that anyone (or more) section, subdivision, paragraph, sentence, clause or phrase had
been declared invalid or unconstitutional.

SECTION 6. The City Council finds and
determines that, pursuant to Government Code §§
65852.21 and 66411.7, this ordinance is not subject to
the California Environmental Quality Act (“CEQA”),
Division 13, commencing with Section 21000 of the
Public Resources Code, because it is not a project as
defined in Section 15378 of the CEQA Guidelines (Title
14, Chapter 3 of the California Code of Regulations).

The ordinance is also exempt from review under CEQA
Guidelines § 15269(c) as it is an action “necessary to
prevent or mitigate an emergency.” Specifically, the
proposed ordinance is designed to mitigate the City’s
shelter crisis, as declared by the City Council on
September 25, 2018 (Resolution No. 4837) under
Government Code § 8698 et seq. In declaring a shelter
crisis, the City, consistent with the law, found that a significant number of persons within the jurisdiction are without the ability to obtain shelter, resulting in a threat to their health and safety. Lastly, the proposed
ordinance is also exempt from CEQA review under
various categorical exemptions including CEQA
Guidelines §§ 15303(c) (related to new construction or
conversion of small structures), 15304(e) (related to the temporary use of land having negligible or no
permanent effects on the environment), and 15311
(related to accessory structures). The proposed
ordinance authorizes the temporary expansion,
establishment, and operation of emergency shelters
during—and only during—the shelter crisis emergency,
as declared by the City Council. The anticipated

Page 18 of 65 ends

14.B

Page 293 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
improvements on the land to operate these shelters are
small, limited, and temporary, and have negligible or no effects on the environment.

SECTION 7. In accordance with Section 36934
of the Government Code, this Ordinance shall become
effective immediately upon adoption if adopted by at
least a four-fifths vote of the City Council. The City
Clerk shall cause this ordinance to be posted in at least three (3) public places in the City of Hemet in
accordance with Section 36933 of the Government
Code.

PASSED, APPROVED AND ADOPTED this
____ day of ___________ 2022.
____________________________
Malcom Lilienthal, Mayor
ATTEST:
_____________________________
John Paul Maier, City Clerk
State of California )
County of Riverside )
City of Hemet )

Page 19 of 65 ends

14.B

Page 294 of 2213 ends

CITY COUNCIL ORDINANCE NO. 2022-xxx
I, John Paul Maier, City Clerk of the City of
Hemet, do hereby certify that the foregoing ordinance
was adopted by the Hemet City Council on the
28th day of June 2022, and was passed by the
following vote:

AYES: Council Members: None.

NOES: Council Members: None.

ABSTAIN: Council Members: None.

ABSENT: Council Members: None.
____________________________
John Paul Maier, City Clerk

Page 20 of 65 ends

14.B

Page 295 of 2213 ends
Page 21 of 65 ends

14.B

Page 296 of 2213 ends

on a Lam s,
02/22/2022
City of Hemet
c/o Planning Department/ Development ReviewCommittee
Subject Property: 200 E.MenloAve. , Hemet ,CA92543
Project: Installationof a 6 PalletSheltervillage Homes (PSV)/ infrastructure / One unit with2 ADACommunity Bathrooms and Showers.

The purposeof the 6 PSVhomes isto increase our bed capacity at Valley Restart Shelter. The 6 PSV willguidethe future character and independent identity of the organizations program and its participants. The Valley Restart isworking with residentsand stakeholdersto identify how to maintain and improve the quality of lifein our communitiesthrough updated goals, policies, mapping, and implementation guides.

The resulting plans, guides, and maps willbe implementedby County government, local authority, community residents, localstakeholders, and/orservice providers.

The improvements include installing a total of 6 PSVhomes to the property and a one unit with 2 AD A
bathrooms to include sinks and stand up showers. Our construction teams willbe running underground utilities, a blockwall, and sidewalkleading into the 6 PSVhomes area.

The pallet homes willconsist of 64 sq ft. storage shelves, a sleeping bunk, electricity air conditioning and heat. The bathrooms willprovidea safe and private space withdoor locks,showers ,toilets, wash station, air-conditioning, automaticfan, poweroutlets and towel racks.

I have attached the cut sheets for your review and peryour request our Architectwillupdate the plan to reflecttheproposedlandscape design requested by the planning department.

Please advise iffurther detail is required withthis submittal packet.

Thank
951-390-9200
Agent for Owner
VRS—Project Consultant
Member

Page 22 of 65 ends

14.B

Page 297 of 2213 ends

_ 3.":

I
I . ' -. —
.

I
j
'-""'.'-'-I.l-'-'r-'-? _ I
'- I'.'l'l'I-H'l'l L H...‘
'
-
' --I-I--I-I}-I-I.—.j
?
I-. r-I.-:.|.|.I-I.-.-_-.a....l_....j....|. _
4- I-L-r-'-iii.-rarrux-.—.p.I.....q....|.._
_ £ E
|
"“
|. -"lZbI1 —.*
I _
'1-'I'“ I
' "—"— '-I-H--— i-Ia.-.I-.-1 _
. -qj.j.:ua-I—.—..-.... H__.I_ .
-é-H ----I-u.-lulu!-.-.4-
|- I I‘-"—iI'I-I-I—I-I-I--j——I
. _ .-I .. . . . I -I. - -._ -

Page 23 of 65 ends

14.B

Page 298 of 2213 ends

l? .1423.

Date
1/H4250.

IJAVIERLOPEZhereby certify that we are the owner(s) of the above-described property. i am respectfullyrequesting processing and approvalofthe above referenced permlt(s)review. I hereby authorize:SONIAMARTHALAMASto act on our behalf during the processing and presentation ofthisrequest. They shal l be the principalcontact withthe City in processingthis application.

Signature
AuthorizedAgent for Owner: Sonia Martha Lamas Date

Page 24 of 65 ends

14.B

Page 299 of 2213 ends
Page 25 of 65 ends

14.B

Page 300 of 2213 ends

VALLEY RESTART
SH
E TER
GENERAL WOOD FRAMING NOTES 1 ALLBEARING WALLS SHALLBE SUPPORTED BVA CONTINUOUS GRADE BEAM

2. ALLWALLS RESTING ON CONCRETE FOOTING SHALLHAVEA PRESSURE TREATEDSILLPLATE AITACHED WITH5/8' DIA ANCHOR BOLTS WITH3'x3'x1/4' WASHER PLATE, SPACED @ NO MORE THAN4'-0'
O C.G EMBEDDED NOT LESS THAN7' IN CONCRETE 3 ALLWALLS ON WOOD FLOORS SHALL BE SUPPORTED WITHDOUBLEJOISTS AND/OR SOLID 4x BLOCKING 4 ALLWALLS SHALLHAVE DOUBLE TOP PLATES, TOP PLATE SPLICES SHALL BE 4'-0' MINIMUMAND HAVENO LESS THAN 10-16d NAILS EVENLY SPA CED

5. STUDS SHALLBE PLACEDWITHTHEIR IMDE DIMENSIONS PERPENDICULAR TO THE WALLAXIS

6. B(TERIOR AND BEARING PARTITIONS, WOOD
S TUDS MAYNOT BE NOTCHED MORE THAN25% OF ITS WIDTH.BORED HOLES SHALLNOT HAVEA DIAMETERGREATER THAN40% OF THE STUD WIDTH (23DB.9.10& 11) AND 60% OF STUD WIDTHIN NON-BEARINGPARTITION WALLS

7. ALLLUMBERSHALLHAVEGRADESTAMPED IN ACCORDANCE WITHTHE AMERICAN LUMBER STANDARDS COMMITTEE (ALSO) ALLLUMBERSHALLBE DOUGLAS FIR LARCH SELECT STRUCTURAL AND/ OR #1 FOR BEAMS, GIRDERS, COLUMNA POSTS & #2 OR BETTER FOR STUD, RAFTERS E JOISTS WITHA MOISTURE CONTENT OF 19% MAXIMUMAND BE FREE OF HEARTS OR CENTERS

9. ALLLUMBERHARDWARE SHALLBE SIMPSON STRONG TIE OR APPROVED EQUAL AND SHALLBE

INSTALLEDFOLLOWING MANUFACTURER'SRECOMMENDATIONS

10. ALLWOOD CONSTRUCTION SHALLAT LEAST MEET THE MINIMUMREQUIREMENTSOF CBC 2019 SECTION 2305,‘ CONVENTIONALUGHT FRAMED CONSTRUCTION.
11 ALLNAILINGSHALLBE PER CBC 2016 TABLE2.104
9 1

12. ALLWOOD IN CONTACT WITHCONCRETE AND/OR SOIL SHALLBE REDWOOD DECAVRESISTANCE AND/OR PRESSURE TREATED

13. GRADE AND SPECIES OF ALLLUMBER FRAMINGMEMBERS MUSTBE GRADE MARKED 14 ALLMANUFACTURED MEMBERS TO BE FABRICATED BY CITYAPPROVED FABRICATOR.

15. RIDGE BOARDS 13.HIP/ VALLEYRAFTERS SHALLBE NO LESS THANTHE CUT END DEPTH OF THE ROOF RAFTERS 16 ROOF PURLINS SHALLNOT BE SMALLER THAN THERAFTER THEYSUPPORT

17. PROVIDE RAFTER TIES SPACED
@ NO MORE THAN4'-0'

OC WHEN CEILINGJOISTS ARE NOT

PARALLEL TO ROOF RAFTERS

18. THE LETTERS 3 NUMBERS INSIDE PARENTHESIS (RR-1) ARE THE CALCULATIONIDENTIFICATION

REFERENCE
19 THREE 5 FOUR STORIES STRUCTURES REQUIRE 314 OR 2x6 STUDS@ 16'O C. MAX IN BEARING

TOP TWO STORIES NAILING SCHEDULE

CONNECTION

JOIST TO SILL OR GIRDER, TOE-NAIL

BRIDGING TO JOIST, TOE-NAILEACH END
1'
X 6' SUBFLOOR OR LESS TO EACH JOIST, FACE NAIL WIDERTHAN1' X 6' SUBFLOOR TO EACH JOIST, FACE NAIL 2‘ SUBFLOOR TO JOIST OR GIRDER, BLINDAND FACE NAIL

SOLE PLATETO JOIST OR BLOCKING, TYPICALFACE NAIL

SOLE PLATE TO JOIST OR BLOCKING, AT BRACED WALLPANELS

TOP PLATE TO STUD, END NAIL
STUD T0 SOLE PLATE DOUBLE STUDS, FACE NAIL

DOUBLE TOP PLATES, TYPICALFACE NAIL DOUBLETOP PLATES, LAPSPLICE

BLOCKINGBETWEEN JOISTS OR RAFTERS TO TOP PLATE, TOENAIL RIMJOIST TO TOP PLATE.TOENAIL

TOP PLATES, LAPS AND INTERSECTION, FACE NAIL

CONTINUOUSHEADER, TWOPIECES

CEILINGJOIST TO PLATETOE-NAIL

CONTINUOUS HEADER TO STUD, TOE-NAIL

CEILINGJOISTS, LAPS OVER PARTITIONS, FACE NAIL

CEIUNGJOISTS TO PARALLELRAFTERS, FACE NAIL
RAFTER TO PLATE.TOE-NAIL
1' BRACE TO EACH STUD AND PLATE, FACE NAIL
1'X 8' SHEATHING OR LESS TO EACH BEARING, FACE NAIL

BUILT-UP CORNER STUDS

BUILT-UP GIRDERAND BEAMS
2' PLANKS

NOTE ALLNAILS SHALLBE GALVANIZED COMMONNAILS
(PER CBC 2019 TABLENO 23049.1)

NAILING
I3} 541
(2) 5d
(2) 5d
(3) 5d
(2) 15.1
16d
@ 15-
o c
(.3) 16d PER 15'
(2) 1:54
(4; Bd TOE-NAIL/ (2) 16d END NAIL
154@ 24' o.c, sTAGG (2 Rows,
16d@ 15-
o c.
(8) 15d
(3) 34
ed
@ so c.
(2) 16d
16d@ 15-
o c ALoNG EA EDGE
I3} 561
(4) Bd
(3; 16d
(3) 15d
(3) 5d
(2) 3d
(2) 54
16d@ 24-0 c
20d@ 32'o.c. ATTBB AND
STAGG. (2) 2o¢1@ ENDs AND
@ EA SPLICE.
(2) 16d@ EA BEARING
ABBREVIATIONS @ AT Q. cENTER LINE DIAMETERoR RoI.IND

11. NAILPENNVWEIGHT
II. POUND OR NUMBER
It PLATE 5 AND
I: CHANNEL 1 ANGLE
souA RE
AB ANCHOR BOLT ARCH. ARCHITECTURAL ALT. ALTERNATE BLK. BLOCK

EILKG BLOCKING
C.-I. CONTROLJOINT CLR cLEAR
CMU coNc. MASONRY UNIT
coL COLUMN
coNc coNcRETE
CONT. CONTINUOUS
coNN. coNNEcTIoN

DFL DOUGLAS FIR LARCH

DBL DOUBLE
I5
E.J EMB
EAFTG
F.F. FDN. GLB GA
HORIZ. HDR
LGMAX. M.B MFR. MIN MTL MLB N.T.s
(N)
0/ OC. OH.

EXISTING
9(PANSION JOINT

EMBEDMENT
EACH

FOOTING

FINISHFLOOR

FOUNDATION

GLU-LAMBEAM

GAGE HORIZONTAL HEADER

LONG MAXIMUM

MACHINEBOLT MANUFACTURER MINIMUM

METAL MICROLLAMBEAM
NOT TO SCALE NEW 0 VER ON CENTER OPPOSITE HAND
REQ'D
ROT. SW. SCH
SIM. SPEC
STD
STL
STAG T 1!G T AB
THK. TYP. TSU N.O
UP. V.I F. VERT.

I/1/K W/O WWF.

REQUIRED
ROTATE
SHEA
R WALL

SCHEDULE

SIMILAR

SPECIFICATION

STANDARD STEEL

STA GGERED

TONGUE& GROOVE
TOP

A BOTTOM
THICK

TYPICAL

TUBE SECTION

UNLESS NOTED

OTHERVWSE UP VERIFYIN FIELD

VERTICAL WIDEFLANGE VWTH WITHOUT WELDEDIMRE
FABRIC
DEF. InzncncSUBMITTALS sac mu NOTE APPLICABLECODES(CBC) BUILDINGSUMMARY LEGALDESCRIPTION 4.zp LOT 31
TRACT 439

CITY HEMET

COUNTY RIVEIBIDE
A.P.N.
# .................................. 043-507-3012

CONSTRUCTIONTYPE V-B
OCCUPANU............................. .. GROUP
B
2019 CALIFORNIABUILDINGCODE
2019 ALIFORNIAMECHANICALCODE
2019 CALIFORNIAPLUMBINGCODE
2019 CALIFORNIAELECTRICALCODE
2019 BUILDINGENERGYEFF.S'|'DS.
2019 CALIFORNIAFIRECODE A PERMITSHALLBEOBTAINEDFROMTHESTATE DIVISIONOF INDUSTRIALSAFETYFORTHEWORKIN TRENCHESOR EXCAVATIONS5' OR DEEPER. SUBMITA COPYOFTHOSEPERMITSTO THEINSPECTOR DURINGCONSTRUCTIONDUSTCONTROLMEASURESSHALLBEREQUIRED. GRADINGWIL BE DISCONTINUEDDURINGFIRST STAGESMOGALERTSANDSUSPENDEDDURINGPERIODSOF HIGH WIND(i.e.: OVER15 MILESPERHOUR). ALLHAULINGTRUCIGSHALLHAVELOADSCOVEREDORWEITEDANDLOADEDBELOWTHE SIDEBOARDSTO MINIMIZEDUST."(APPLIS TO DEMOLITION,GRADING&CONSTRUCTION)

SUBMTITALDOCUMENTSFORDEFERREDSUBMITTALITEMSSHALLBESUBMITTEDTO THE ARCHITECT OR ENGINEEROF RECORD,WHO SHALLREVIEWTHEMANDFORWARDTHEMTO THEBUIIDING

OFFICIALWITHANOTATIONINDICATINGTHATTHE DEFERREDSUBMITTALDOCUMENTSHAVEBEEN

REVIEWEDANDTHATTHEYHAVEBEENFOUNDTO BEIN GENERALCONFORMANCEWITHTHE DESIGN OFTHEBUILDING.THE DEFERREDSUBMTITALI'|'EMS SHALLNOT BEINSTALLEDUNTILTHEIRDESIGN ANDSUBMITTALDOCUMENTSHAVEBEENAPPROVEDBYTHEBUILDINGOFFICIAL. 1) NONE

VICINITYMAP SCOPEOF WORK SHOPASSYDRAWINGS ARCHITECTURALDRAWINGS SHEET.NO.

T-1
A1.0
A2.0
A3.0
A4.0
SHEET.NO.
34010
20009
10146
30503
10368
E1.1B
E2.G

DOCUMENTATIONTO INSTALLPALLETHOUSINGON
'|TTLE OF SHEET

GENERALPROJECTINFORMATION

PLOTPLAN

PALLETAREALAYOUT

FOUNDATIONSLABLAYOUT

GREENBUILDINGSTANDARDS

ADAHYGIENEUNTTPLUMBING

BASEFRAMESHELTERUNTT

BASEFRAMEHYGIENEUNIT

ADMINSTALLUNIT

COMPONENTSHOPDRAWINGS WIRINGDIAGRAMS WATERHEATERWIRING DIAGRAM

SITE OF VALLEYRESTART PROPERTY
2-!-2

MENLOAVE
E
I-
[K< .1, EL”
V
< " E
g § 2 f ‘.5B
UJ
o 5 <' 1' 2 °. 3 > O 3 g .. < <0 2 0 - co
“‘ 5 3
I—
<
O ‘L
2<
(D
1:
l.|.l
I-
_l
5:‘
en
E 5 |- 3 -
‘-_',J
M _|
6 o
< z
I: Lu [5 D. 5 2 5 DJ
In’I =
>-
Lu
.1
2' >
REVISIONS:

DATE: FEB. 20, 2022 SCALE= AS NDTED
DRAWN: DVANE
PRUJECT :GAM-D58
um. msooavnzunsnesms nmeenvvorwm Aweaaru nnsouu
your 1:: nsmow:::nwmo\.I1 newarrsn Dom-Em tr tun Auoauss SHEET NUMBER:

Page 26 of 65 ends

14.B

Page 301 of 2213 ends
Page 27 of 65 ends

14.B

Page 302 of 2213 ends

EXISTING BUILDI

GRASS AREA
MAN

ADA STALL

SIGNRGE
-NI

HVDRANT
AV
418

SHELTER

ADA RESVRUDMS
(N) 6' HIGH CMU WA @ E43’ LUNG

GRASS AREA
(E) ASPHALT PARKING AREA
SCALE: 1. 80-0’
FNIE: FEB E0. 2022 SCALE: AS NDTED
nRAvN- DUANE
PRUJE?1 ; GAI1-053
SHEETNLMBER:
._<>
JJ 1-
REVIEONS:

Page 28 of 65 ends

14.B

Page 303 of 2213 ends
Page 29 of 65 ends

14.B

Page 304 of 2213 ends

am: In an.
ace:
smc ~s wvtn
xmw um»:
amp: mmwas * PLUMBINGPLAN SHALL ADHERE TO THE
2019 CALIFORNIA PLUMBING CODE (2019 CPC)
NOTES: PIPING MATERIAL WATER — TYPE "L" COPPER WASTE — CAST IRON OR HUB/PLASTIC VENT
— CAST IRON OR HUB/PLASTIC
HB.

W
WH

GAS GAS
____5.___

HOSE EBS
COLD WATER LINE 1/2"¢
& 3/4" an HOT WATER LINE 1/2"¢

WATER HEATER

GAS UNE

SEWER UNE
32’
6X PALLET SHELTER

HDMES TYP
SEE SHEETS 10368
&
ELIB
96' 7%”
6 TYP TYP TYP
4’TYP
10’

LANDCAPE LANDCAPE

E) CDNCRETE
EXIST 400 AMP ELECT PANEL W/6’ CDPPER GREIUND RDD
EXIST. WATER METER MAIN

EXISTING BUILDING
ARE
A I U | SCALE: 1/8' =1/-0‘
IWW

E-STALLS ADA RESTRDDMS
SEE SHEET 30503
&
EEG

CDNCRETE SLAB
7’6”TYP
3-1/E” ¢ DRAIN
PIPE
(E) SEWER MAN
HDLE
1/_0n

REVIS ONS
SHEET NUMBER :
_.'._.______|_______1_______.r_______'___1
<0
.<u._.u<n._:
.u><o._zm2 .u8~
E.5u_._.u. ._.~_<._.m_¢ >m_._._<>
r--r--

Page 30 of 65 ends

14.B

Page 305 of 2213 ends
Page 31 of 65 ends

14.B

Page 306 of 2213 ends

m
r
DC
Va
66 4.7
80/1

3.3 UN WAIIN JLAN
1555
(AT BUIDING)
14 90
REVISIONS:
#4 HEIRIZ.
@ 24' #5 REBAR AT JAMB
#4 VERT.
@ 84'
8' CEINC BLK WALL

FILL CELLS SEILID

CEMENT CAP

CEMENT PLASTER V/DRKYVIT
FINISH DVER 8'X8"X16' CMU PAINT WHITE
TU MATCH (E) BLDG.
#4 VERT
@ 84' DC W/ BENDS ALTERNAE TAILS
#4 90° REBARS
@
32" EIC
12'
84 REBAR T/B
/T\ CMU WALL DETAIL
W39
20" MIN
18" 15"

19.7 4”
C 1 3f79NC.SLAB W/
6X6 WIRE MESH
DVER
10 MI

16.3 45.7
R 53SS
8”SAND DVER

VISQUEEN
181/
SLAB

EACH TRAP SURFACE

AREA SHALL HAVE
A
1-1/8” SLDPE
4” THK
-CII

N N/IZVM
15/1

TRAPS TYP
DATE: FEB 20. 2022 SCALE= AS NEITED

DRAWN DVANE
PRDJECT : GAM'U55
f2)TRENCHFOR WATER LINE
,’3)TRENcHFOR ELEC. CONDUI1

Page 32 of 65 ends

14.B

Page 307 of 2213 ends
Page 33 of 65 ends

14.B

Page 308 of 2213 ends

N STAN

NMN AT RYM
mlrmuhul won .1... .... -«day CHI ?w... ;..w«. nc?uhv
amtumu cannon
41052 Storm water drainage and retention during construction This Project which disturb less than one acre or soil and is not part ol a larger common plan at development which in total disturbs an acre or more, shall manage storm water drainage during construction in order to manage storm water drainage during construction, one or more ol the lallawing measures shall be implemented to prevent llooding or adjacent property, prevent erosion and retain soil runall an the site 12 Retention basins oi sullicient size shall be utilized to retain storm water on the site where storm water is conveyed to a public drainage system, collection point, gutter or similar disposal method, water shall be littered by use ol a barrier system, wattle or other method approved by the entorcing agency.

Compliance with lawlully enacted storm water management ordinance 4 too 3 Surlace drainage ;
The site shall be planned and developed to keep surlace water lrom entering buildings construction plans shall indicate the site grading away train buildings at least 2 z or a drainage system that will manage surlace water llows Examples oi methods to manage surlace water include, but are not limited to, the lallawingz I2345 swdles water collection and disposal systems
French drains water retention gardens
other water measures which keep surlace water away lrom buildings and aid in groundwater recharge 4303 Indoor water use : 1 Each plumbing liitture and litting shall meet reduced llow rates specilied in Table 43032 431133 Plumbing liitures and littings
Plumbing lixtures (water closets and urinals) and littings (Faucets and showerhedds) shall meet the standards reterenced in Table
4 5033
4 304 4 304 I Irrigation controllers Automatic
inspection I Controllers shall be weather-or soil n'laisture—based controllers that automatically adjust irrigation in response to changes in plants‘ needs as weather conditions change
2 Weathar—based controllers without integral rain sensors or communication systems that account tar local rainlall shall have a separate wired or wireless rain sensor which connects or communicates with the contro||er(s) Soil moisture—based controllers are not required to have rain sensor input 4 406 ENHANCED DURABILITVAND REDUCED MAINTENANCE 4 4051 Joints and openings : Openings in the building envelope separating conditioned space lrom unconditioned space needed to accomodate gas. plumbing, electrical lines and other necessary penetrations must be sealed in compliance with the Calilarnia Energy Code Exceptions :

Annulor spaces around pipes, electric cables. conduits or protected against the passage bl rodents by closing such openings concrete masonry or a method acceptable to the entorcing agency.
4405 CONSTRUCTION WASTE REDUCTION, DISPOSAL AND RECYCLING 44051 Construction waste reduction at at least 50 percent :

Recycle and/cir salvage lor reuse a minimum at 50 percent or the non hazardous construction and demolition debris. or meet a local construction and demolition waste management ordinance. whichever is more stringent Exceptions : I2
Excavated sail and lond—clearing debris
Alternate waste reduction methods developed by working with local agencies it diversion or recycle locilities capable at compliance with this item do not exist ar are not located reasonably close to the jobsite 44082 Construction Waste Management Plan : Where 0 local 'prisdictian does not have a construction and demolition waste management ardinance. a construction waste management plan shall be submitted tor approval to the entorcing agency that : I2345 Identifies the materials to be diverted lrom disposal by recycling, reuse on the project or salvage tor luture use or sale Specilies it materials will be sorted on—sile or mixed for transportation to a diversion lacility Identities the diversion iocility where the material collected will be taken Identities construction methods employed to reduce the amount at waste generated Specities that the amount at moterials diverted shall be calculated by weight or volume. but not by both 4 408 21 Documentation : Documentation shall be provided to the entorcing agency which demonstrates compliance with section 4405 2. items 1 through 5 The waste management plan shall be updated as necessary and shall be accessible during construction lor examination by the entorcing agency 4 408 2 2 Isolated Jobsiles :

The entorcing agency may make exception to the requirements at this section when jabsiles are located in areas beyond the houl boundaries at the diversion lacility. 4 410 BUILDING MAINTENANCE AND OPERATION
44101 Operation and maintenance manual 1 At the time at linal inspection, a manual, compact disc, web—based releronce or other media acceptable to the entorcing agency which includes all or the lallawing shall be placed in the building :

1. Directions to the owner or occupant that the manual shall remain with the building throughout the lite cycle at the structure
2 Operation and maintenance instructions lor the lollowing : A Equipment and appliances, including water-saving devices and systems, HVAC systems. woler—heoling systems and other major appliances and equipment Root and yard drainage. including gutters and downspouts space conditioning systems, including candensors and air litters Landscape irrigation systems
moon:

Water reuse systems 3 y, woter and waste recovery providers on methods to lurther reduce resource consumption, including e yce
4 Public transportation and/or carpool options available in the area 5 Educational material an the positive impacts at on interior relative humidity between 30-60 percent and what methods on occupant may use to maintain the relative humidity level in that range 6 inlarmotion about water—conserving landscape and irrigation design and controllers which conserve water 7 instructions lor maintaining gutters and downspouts and the importance or diverting water at least 5 feet away lrom the loundation 5 iniormatian an required routine maintenance measure, including. but not limited to caulking, pointing, grading around the building etc
9 to
A copy at all special inspection veritications required by the entorcing agency or this code 4 so: FIREFLACES 4 5031 General : Any installed gas lireplace shall be a direct-vent sealed-combustion type Any installed woodstavc or pellet stove shall comply with US EPA Phase II emission limits where applicable Waodstaves, pellet slaves and lireplaces shall also comply with applicable lacal ordinances 4 504 4 5041 Covering oi duct openings and protection at mechanical equipment during construction :

At the time at rough installation ar during storage on the construction site and until linal startup or the heating and cooling equipment, all duct and other related air distribution component openings shall be covered with tape, plastic. sheetmetal or other methods acceptable to the entorcing agency to reduce the amount at dust or debris which may collect in the system 4 5042 Finish moterial pollutant control Finish materials shall comply with this section 4 504 2 I Finish moterial pollutant control Adhesives. sealants and counts used on the p oec shall meet the requirements ol the lollowing standards unless more stringent local or regional air pollution or air
g
y management district rules apply ; l Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers. and coulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAOMD rule 1155 voc limits, as shown in Table 4 5041 or 4504 2. as applicable such products also shall comply with the rule llsa prohibition on the use or certain toxic compounds (chlorolorm, ethylene dichloride, methylene chloride, perchloraethytene and trichloroethylene), except lor aerosol products. as specilied in subsection 2 below 2 Aerosol adhesives. and smaller unit sizes at adhesives. and sealant or caulking compounds (in units ol product, less packaging, which do not weigh more than 1 pound and do not consist at more than is lluid ounces) sholl comply with statewide voc standards and other requirements,
including prohibitions on use at certain toxic compounds. at calilornio code ol Regulations Title 17, commencing with section 94507 4 504 2 2 Points and coatings Architectural points and coatings shall comply with voc limits in Table l at the ARB Architectural suggested control Measure. as shown in Table 4504 3. unless more stringent local limits apply The voc canlenl limit tor coatings that do not meet the delinitians tor the specialty coatings categories listed in Table 45043 shall be determined by clossilying the cooling as a Flat. Non?at or Nonllat—l-tigh Gloss coating, based on its glass. as delined in subsections 421, 435, and 437 at the 2013 caiilarnia Air Resources Board, suggested control llleosure, and the corresponding Flat. Nontlot or Nanllal-l-ligh class voc limit in Table 4504 3 shall apply. 4 504 2 3 Aerosol paints and coatings Aerosol paints and coatings shall meet the Product—Weighted MIR limits tor Roc in section 94522 (o)(3) and other requirements, including prohibitions on use at certain toxic compounds and ozone depleting substances, in Section 94522 (c) (2) and (d) (2) at calilornia code ol Regulations, Title I7. commencing with section 94520; and in areas under the jurisdiction oi the Bay Area Air auolily Management District additionally comply with the percent voc by weight or product limits at Regulations 5. Rule 49 A 506 2 4 Veriticatian Verilicatian at compliance with this section shall be provided at the request ol the entorcing agency Documentation may include, but is not limited to, the lallowing : l Manulacturer's product specilication 2 Field verilication oi on—site product containers 4 504 3 Carpet Systems All carpet installed in the building interior shall meet the testing and product requirements at one at the lollowing 1 carpet sc Rug lnstitute's Green Label Plus Program 2 colitornia Department at Public Health standard Practice tor the testing at vocs (speciticatian 01350) 3 NSF/ANSI140 at the cold level 4 scientilic certilications systems ‘indoor Advantage Gold 4 504 31 Carpet Cushion All carpet cushion installed in the building interior shall meet the requirements at the carpet and Rug Institute Green Label Program 4 504 3 2 Carpet Adhesive All carpet adhesive shall meet the requirements 0! Table 4 5041 4 504 4 Resilient lloaring system where resilient lloaring is installed, at least 50 percent ol lloor arch receiving resilient lloaring shall comply with the voc emission limits delined in the collaborative tor high perlormance schools (CHPS) Low—amitting Materials List or certilied under the resilient Floor covering institute (Rrcl) F|oarScare program 4 504 5 composite wood products Hardwood plywood, particle board and medium density liberbaard composite wood products used an the interior or exterior at the building shall meet the requirements tor larmal dehyde as specilied in ARB's Air Toxics control Measure lor composite wood (17 ccR 93120 at sea), by or belare the dates specilied in those sections. as shown in Table 4504 5 4 504 51 Documentation
verilication or compliance with this section shall be provided as requested by the enlorcing agency Documentation of the lollawing : l Product certilications and speciiicotians 2 chain at custody certilications 3 other methods acceptable to the entorcing agency 4505 INTERIOR MOISTURE CONTROL 4 505 2 concrete slab laundatians concrete slab loundotians required to have a vapor retarder by colilornio Building Code, ccR, title 24, Part 2. chapter 19, shall also comply with this section 4 505 21 Capillary break A capillary break shall be installed in compliance with at least one at the lollowing :
l.A 4-inch (101.5 mm) thick base at is inch (127 mm) or larger clean aggregate shall be provided with a vapor barrier in direct contact with concrete and a concrete mix design, which will address bleeding, shrinkage, and curling, shall be used For additional information, see American concrete institute, Act 302 2R—06 2 other equivalent methods approved by the entorcing agency. 3 A slab design specilied by a licensed design prolessianai 4 505 3 Maisture content or building materials Building materials with visible signs at water damage shall not be installed Wall and lloor lroming shall not be enclosed when the lroming members exceed 19 percent moisture content Moisture canlenl shall be veriticd in compliance with the tallawing
2 1 Moisture content shall be determined with either a prabe—type moisture meter 2 Moisture readings shall be taken at a paint 2 reel (510 mm) to 4 leel (1219 mm) lrorn the grade stamped end at each piece to be veri?ed 3 At least three random moisture readings shall be perlormed on wall and lloor lroming with documentation acceptable to the entorcing agency provided at the time at approval to enclose the wall and lloor lroming insulation products which are visibly wet or have a high moisture content shall be replaced or allowed to dry prior to enclosure in wall or lloor cavities wet-applied insulation products shall iollow the monuraclurer's drying recommendations prior to enclosure 4 505 INDOOR AlR QUALITYAND EXHAUST 45051 Bathroom exhaust ions Mechanical exhaust tans which eilhaust directly from bathrooms shall comply with the Iollowing : 1 Fans shall be ENERGY STAR camplaint and be ducted to terminate outside the building 2 Unless lunclianing as 0 component at a whole house ventilation system. tons must be controlled by a humidistat which shall be readily
accessible
t-lumidistot controls shall be capable ol adjustment between a relative humidity range or 50 to 50 percent Note : For the purposes at this section, a bathroom is a room which contains a bathtub, shower or tub/shower combination 4 507 ENVIRONMENTALCOMFORT 4 507 1 Openings Whole house exhaust lans shall have insulated ar covers which close when the tan is all Covers ar 4 507 2 Heating and Air—conditioning system design He and air—canditianing systems, shall be sized, designed and have their equipment selected using the lot methods : l The heat loss and heat goin is established according to ACCA Manual J, ASHRAE handbooks or other equivalent design soltware or methods 2 Duct systems are sized according to AccA 29-0 Manual D. ASHRAE handbooks or other equivalent design soltware or pnethads 3 Select healing and cooling equipment according to ACCA 35-5 Manual 5 or other equivalent design soltware or methods Exception : use at alternate design tempralures necessary to ensure the systems lunction REV
S ONS
DATE: FEB 20. 2022 SCALE= AS NUTE D DRAWN: Dlw/ANE
PREIJECT : GANFD58
SHEET NUMBER:
ivrigo Ion system conlrollars (or landscaping provided by lhe builder and installed at the lime of Iinal shall comply with true Vcllowingz a mu. ms nocuuzm Is he sols mzvznrv or mull lssncurss MD sruu. nowas R£Nl0DUCEDW1>O01lT V>€WHl'1EN oonssm or lnssouluss _ >n._._._<>

GREEN BUILDI
G
Bmsowa

Page 34 of 65 ends

14.B

Page 309 of 2213 ends
Page 35 of 65 ends

14.B

Page 310 of 2213 ends

64 SQ FTFront Vie
lace so
I anchors
O0# hol och of f0
Customer respo le to
F
1 given The speci ubsfr
nn1E wr’
From bottom
f
b from ‘to
d freshh Id IT 2-7/8'

DIMENSIONSNEEININCHES
bonovscuenuwmo
_..k.._!.___.__...- ..
_.?_._
__.__ . ..

REVISIONS
ZONE DESCRIPTION DATE A Original Release 9/I/
2020
TOLERANCES:

Sign FRACTIONAL:I/32
ANGULAR:MACH:1' BENDzI' Date TWOPLACEDECIMAL:g.o3
THREEPLACEDECIMAL:3.01
rnomsww ANDCONFIDEN'I1AL
THEINFORMATIONCONTAINEDINmus DRAWINGISTHESOLEPROPERIYor DRAWNBY Part Number Palet src LLCANYREPRODUCHONIN DATE Date _.<.‘-.1... . PARTon As A WHOLEWITHOUTTHE WRITTENPERMISSIONOF Pallei SPC IS PROHIBITED.

Approved by
REV

89.50 .75" Dion.Steel Hold Down Rod 4 Places
_
P nd bags or use me_chcmIcc1 2 d down load required on e ur corners. nsib determine best method
tic 5 ate that the
shelter unit issitting on (soil, concrete,c1spholt, etc)

6.28 103.50
AD TITLE:,.
64 SQFT Pallet Shelter
0 Use e FrontView
OO|'
0 IS
signature Don Bender REV 10368 A

Page 36 of 65 ends

14.B

Page 311 of 2213 ends
Page 37 of 65 ends

14.B

Page 312 of 2213 ends

support
c
42 inches
Place sand bags or use mechonicat anchors
200# hold down load required on each of four corners.

Customer responsible to determine best method
g?vehthe specific substrate that the s elter unit issitting on (soil, concrete, asphalt, etc) DCITGq._,\......:ZO._... PARTon ASA WHOLEWITHOUTTHE WR|1TEN PERMISSIONor Pallet SPCIS PROHlB1'|'ED. ___. .

REVISIONS
ZONE REVA Original Release 9/1/
2020

DIMENSIONSAREININCHES
TOLERANCES:

FRAC11ONAL.0.l/32
ANGULAR:MACH:l' 8END:l' Date TWOPLACEDECIMAL:2.03
THREEPLACEDECIMALI2.01

PROPRIEIARYANDCONFIDENTIAL
INFORMATIONCONTAINEDINTHIS DRAWNBY IsTHESOLEPROPERTYOF Part Number SPCLLCANYREPRODUCTIONIN Approved

DESCRIPTION DATE
Fire Extinguisher mounted to shelf
2300 hdnnel post
from floor surface
Shelves QTY3
Fold Up Bed

38.75 80.00
.75"Did.Steel Hold Down Rod 4 Places
Fold Up Bed

72.96 TITLE:
64 SQ FT Pallet Shelter
Plan View
Don Bender REV 10368 A1 Page 38 of 65 Page 59 of 86

14.B

Page 313 of 2213 ends
Page 39 of 65 ends

14.B

Page 314 of 2213 ends

64 SQ FTBack Wall Vie
Place sand bags or use mechanical anchors
200# hold down load required on each of four corners.

Customer responsible to determine best method
given the specific substrate that the
shelter unit issitting on (soil. concrete. asphalt, etc) _-_ Approv 3 -K
Ap;;c:ekw: ' cguc?o
_
AA
7 —— . . —
—
_;_ ' ‘ i ‘W!

REVISIONS
ZON
E
Original Release
UNLESS OTHERWISE SPECIFIED: DIMENSIONSAREININCHES
TOLERANCES:

FRACIIONAL: I/32
ANGULAR:MACH:I ' BEND:l'
TWOPLACEDECIMAL:2.03
THREEPLACEDECIMAL:1.01
PIIOPRIEIARYANDCONFIDENTIAL [)0 N01"5cA|_E mmwmg THEINFORMAIIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYor DRAWN“Y REV FaIIeISPCLLCANYREPRODUCTIONIN DATE Dclte PARTon ASA WHOLEWITHOUTTHE WRII'|'EN PERMISSIONOFPa||e1SPC IS REV DESCRIPTION DATE A 9/1/2o2o
Opening for Op?onal AC

89.50 .75" Dia. Steel Hold Down Rod 4 Places
|<628
103.50
Emergency
Egress Panel 111153
"="=' 64 SQ FT Pallet Shelter
BackWallView
Date
Don Bender Par, Number
10368
A
EIGHT: SHEET1OF

Page 40 of 65 ends

14.B

Page 315 of 2213 ends
Page 41 of 65 ends

14.B

Page 316 of 2213 ends

[
"" ’_1
200# hold down load required on ecuch of four com
Customer responsible to determine best mefhod
given the specific substrate that The
shelfer unh‘issitting on (soil, concrete, asphalt, etc) —
n armrbyF
signcrure.b_. .

2.:.\;ZD_
_
DIMENSIONSAREINmcna
DECIMAL: no No! sen: ouwms ——4—
umessomsnwnssrzcuaaz:" 1
~.7_1_j:_.

REVISIONS
REV.
9/1/2020
64 SQ Fl End Wall View

89.50 Hitch Clip Pin 33,51/g'l 510
.75" Dia. Sleel Hold Down Rod 4 Places
Place sand bags or use mechanical anchors
ers
P'''“‘ 64 SQ FT Pallet Shelter
End WallView
Approved PROPRIETARYANDCONFIDENTIAL Eclmzgggder Part Number RE " " V l0368 A SHEEl'l or

ZONE DESCRIPTION DAT E
Original Release
91'.25
TOLERANCES:

FRACTIONAL: I/32
ANGULAR:MACH:1‘ BEND:l' Date TWOPLACEDECIMAL:1.03
THREEPLACE 2.01
THEINFORMAHONCONTAINEDINTHIS DRAWINGISTHEsou: PROPERTYor DRAWN“Y Palletsrc LLCANYREPRODUCTIONI Dafe DATE met oneAS Awuouswumourme WR|'|TB~l PERMISSIONOFPol|e1SPC IS

Page 42 of 65 ends

14.B

Page 317 of 2213 ends
Page 43 of 65 ends

14.B

Page 318 of 2213 ends

.125
Both
“IJTEs§?rTE?M§§P’E<?EE ’ i ’ ’ ’"”" ’ ” ’ ’ ’ ’ ”'
" "'
olmmsauus

REVISIONS

ZONE REV DAT E
Original Release
AREINwcues TOLERANCES:

FRACTIONAL:l/32
ANGULAR:MACHz1' BEND:1‘
Date rwo PLACEDECIMAL:.oa
THREEPLACEDECIMAL:2.01 PROPRIETARYANDCONFIDENIIAL Appro ve d b y me|NFORMA'l1ON CONTAINEDINn-us DRAWINGIS DRAWNBY THEsousPROPERTYor Part Number Palletsrc LLC ANYREPRODUCHONIN DME Dafe ‘ PARToneASA WHOLEWITHOUTTHE WRITTENPERMISSIONOF PalletSPC IS

DESCRIPTION
A 9/
T/2020

32.00 __ , , Dlclmeler HI’rchCllp Pm
ends of .75 Die.

Steel Rod

DETAILA

6.28 TITLE:

Base Frame Bottom View
64 SQ FT Pallet Shelter
Sig Don Bender REV 10368 A
SHEET

Page 44 of 65 ends

14.B

Page 319 of 2213 ends

\. /‘!_'L
—

Page 45 of 65 ends

14.B

Page 320 of 2213 ends

" 2"
X .065
HIFchPu Clip
-‘
P
—~ 100
wuss OVHERWSESPECIHED: ’ _ , nuususxxms/ms INmcuss 6-? , . _aseFra - \ ~ xgnProt 7 gem nuwma ‘ i » — l l 166-11-2019 ‘ 1 u l ‘ ECN: n n n |tem# PCIYTNunmber

28.4]
Rec lube I"X 2"X .U6b"
Length

90.00"

99.50"
QTY
IOIQ
14 mA——

31.25 Cut Type
45 degree mner
TOLERANCES:

FRACTIONAL:I/32
ANGULAR:MACH:1' BEND1l' TWOPLACEDECIMAL:2.03 THREEPLACEDECIMAL:£»0| DO NOT Port No / Drawing No REV A 10098 10099
10100
10101
10001
20018
20019
20036 10295
.38
25 22.25

44.50 66.75

28.41 MCl1el'lC1|
Rec Tube 1''
x 2"
x .065"
Rec: Tube 1 x
Rec Tube 1''
x 2"x .065"
SQ Bar 1"
Pldscore Front Floor
>|dscore Back Floor
Hold Down Rod .75 645cm H

23.41 3150

31.25 21.25 J21.25

21.25 21.25

50.25 101 .50"

21.25"

2.00"

69.00 .50

99.50 1/8
1/8
10 77.08 101.50
TYP
FillWeld Crdter
45 degree miter
SQ Cut
SQ Cut
SQ Cut

1.00 .38

1.90 1_
‘/8 TYP
1/3 FillWeld Crater
Items 6,7,8,9 Not Shown For Cldrity
TITLE:

Pallet 64 sqft
B
New des
Don Bender
20009
.50
me
o-Type
CDC;-\
u )0 H‘
w 13¢: _‘)_
REV: DESCRIPTION

PROPRIETARYANDCONFIDENTIAL

THEINFORMATIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYOF PALLEISHELTER LLC ANYREPRODUCTION

INPARTOR ASA WHOLEWITHOUTTHE WRITTENPERMISSIONOFPALLEISHELTER ISPROHIBITED. PATENTPENDING

DRAWNBY DATE REVBY
REVDATE iWEI

Page 46 of 65 ends

14.B

Page 321 of 2213 ends

--j
II.
.
.”-

Page 47 of 65 ends

14.B

Page 322 of 2213 ends

REVISIONS
ZONE REV DESCRIPTION DATE APPROVED A Original Release 1/] 7/2022 Approved by Qualify
Signature
Date
Approved by Production
Signature PCITTNumber
Dore
A
ECN: REV: DESCRIPTION:

SHEETI OF]
THLE
"""°' ADA-Admin Stall Hygiene Uni
100SF t
Don Bendel
1/17/2022
ISO View

24.75 19.75 9.75
167.38
63 38
Back View
638
Combo Heater/AC
AC=75OO BTU
Heater=385O BTU
145.75550
Load Center
Breaker Box
25 AMP
165.50
ADA Stall
Toi|et—Shower—Sink
36 Inch Doo
Entrance Light
Entrance Light
32 Inch Door
Front View

PROPRIETARYANDCONFIDENTIAL
THEINFORMATIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYOF Pallet SPC ANYREPRODUCTIONINPART OR ASA WHOLEWITHOUTHEWRITTEN PERMISSIONOF Pallel SPC ISPROHIBITED.

Admin Stall
Toi|et—Sink

8.56 UNLESSOTHERWISESPECIFIED: DIMENSIONSAREININCHES TOLERANCES: FRACTIONAL:I/32 ANGULAR:MACH:1’ BEND1| ' TWOPLACEDECIMALZ1.03 THREEPLACEDECIMAL:2.01 DO NOT SCALEDRAWING DRAWN BY DATE Reviwed By
Approved By
93 93.48
End View
111.77
2 inch Schedule 40
PVC Sink Drain
Toilet Hook up

3.5 inch Schedule 40
2 Inch
PVC
hedule 40
Shower Drain 2 Inch PVC
Sink Mount Plate
Access Panel
Instant Hot Electrical
Water Heater
Sink Drain 2 Inch Schedule 40
PVC
oilet Hook up

3.5|nch
Option: Gas
Water Heater
Sink Mount Plate
Incoming Water 1 Inch NPT
col
wr
[ill

Page 48 of 65 ends

14.B

Page 323 of 2213 ends

-uJI—-'-

Page 49 of 65 ends

14.B

Page 324 of 2213 ends

REVISIONS
ZONE REV DESCRIPTION DATE APPROVED A Original Release I/I 7/2022 Optionzlnstant Hot Water Heater
Second Heater For Cold
Weather Area
80 CFM Ventalation Fan
Instant Hot Water Heater CFM Ve"”C"G?°"‘ F0” Safety Bar Incoming Water Line
Load Center 1 Inch NPT
Breaker Box
125 AMP
Option:

Gas Water Heater
Safety
Floor Drain
Floor Drain
Combo Heater/AC
AC= 7500 BTU
Heater: 3850 BTU Cal. Shower ADA
63 x 37x 82
ADA Compliant
Sink
Interior Wall
V
T Radius
36 Incn Door Opening 32 Inch Door Opening

DESCRIPTION
I8.0 I 65.50
UNLI:3b U|HI:KW|3I: 5I"I:C|I'|tl): DIMENSIONSAREININCHES TOLERANCES: FRACTIONAL:I/32 ANGULAR:MACH2| ' BEND:I ° TWOPLACE DECIMAL: 2.03 THREEPLACEDECIMALZ’_'.0I PROPRIETARYANDCONFIDENTIAL no Not scA|_E nnAw|N¢; THEINFORMATIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYor DRAWN BY Palletspc ANYREPRODUCTIONINPART oneASA WHOLEwrmourTHEWRITTEN PERMISSIONor Pallet SPC ISPROHIBITED. Reviwed By
Approved By

93.47 Approved by Quality
Pam
Signature
Date
Approved by Production
signature Pan‘ Number
Date
|WE|
TITLE:

ADA- Admin Hygiene Unit
100 SF
Plan View
DODBender
1/I7/2022 3401
O
SHEET1 OF

Page 50 of 65 ends

14.B

Page 325 of 2213 ends
Page 51 of 65 ends

14.B

Page 326 of 2213 ends

Box
REV: DESCRIPTION:

REVISIONS
ZONE REV DESCRIPTION DATE APPROVED A Original Release 1/] 7/2022 Approved by Quality
Signofure
Date
Approved by Production
Signature RE
Date
VA
|WElGHT SHEET1 OF
TITLE:
""'°' ADAIAdmin Hygiene Unit 100SF
Don Bende' Part Number
1/17/2022
Combo Heofer/AC
AC= 7500 BTU
Combo Heme’/AC Heater: 3850 BTU
166.00
Elecfricol Brecrker
Box 125Amp
cv§|<r
Breaker
r\ <r T1 r_r,\
ED &
93i" 2
ADA sink Drain Floor Drain Floor Drain
Toilet Drorin
Toilet Droin
Admin’ sink Dram Op?on: Gos Wafer Heater
ECN

1.60I47.38400 39. 5400 62. I8.00 8.25 9.98 53.8656I86.61 02.00

PROPRIETARYANDCONFIDENTIAL THEINFORMATIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYOF Pa||eI SPC ANYREPRODUCTIONINPART OR ASA WHOLEWITHOUTTHEWRITTEN PERMISSIONOF Pa|IeI SPC ISPROHIBITED.

93.48 UNLI:5b UIHI:KW|3I: bI‘I:L,'lI'|I:D: DIMENSIONSAREININCHES TOLERANCES: FRACT|ONAL1I/32 ANGULAR:MACH:I ' BEND:I ' TWO PLACE DECIMAL: 2.03 THREEPLACEDECIMAL2:.0I DO NOT SCALE DRAWING DRAWNBY Reviwed By
Approved By
III.77

Page 52 of 65 ends

14.B

Page 327 of 2213 ends
Page 53 of 65 ends

14.B

Page 328 of 2213 ends

l’rem#
CI\lD~(J'IJ>CAJN
25 22.25

66.75 90.00
Part Number
10103
10099
10104
10101
10157
10147
10796
IUZ‘/b

30.25 21.25

21.25 21.25
Rec Tube l"
X 2"X .065"
Rec Tube 1"
x 2"x .065"
Rec Tube 1"
x 2"
x .065"
Rec Tube 1"
x 2"
X .065"
SQ Bar 1''
SQ Bar
_/5 L)I(1_STeeIROd
HiTCh C110

53.66 6175
31 160.00
.38
G
1/8
1/8

80.50 31.25 162.00" 2

90.00"
2 l60.00" 3

21.25" 22

2.00‘
(V)
1-0 ('0 N .< O C
ox r—-
Tvio
FillWeld Crdler
130.75
Cut Type
45 degree miter
45 degree miter
SQ Cul
SQ Cul
SQ Cut 48
161.002

30.25 .38
Pallet

1.00 1.00
75 1/8
1/8
25 1.00
TYP
.50
FillWeld Crdler

30.25 DETAILB
SCALE1 1 10
TITLE:
100 sqft base frame
New design Proto-type 1.00
Material Length QTY 7 5 2

1.25 “-7
Por1No / Drawing No REV 10146 c
OF
50 PROPRIETARYAND CONFIDENTIAL THEINFORMATIONCONTAINEDINTHIS DRAWINGISTHESOLEPROPERTYOF PALLEISHELTERLLC ANYREPRODUCTION

INPART OR AS

A WHOLEWITHOUTTHE WRITTENPERMISSIONOF PALLEISHELTER REVBY

ISPROHIBITEDPATENTPENDING

AREININCHES
I6.75
I/8 / I/8
TYP
I7.I3
FRACT|ONAL:I/32
ANGULARIM/\CH:1'BEND:l ' TWOPLACE DECIMALI $.03 THREEPLACEDECIMALZ:.0| 12 Points OfContact Do NOT SCALEDRAWING DRAWNBY DOT} Bender one O6-1I-2019 DESCRIPTION:

Page 54 of 65 ends

14.B

Page 329 of 2213 ends
Page 55 of 65 ends

14.B

Page 330 of 2213 ends

SCHNEIDER HOM SEIES -10.900AIC RATED (BAED ON CIRCUIT BREAKERS INSTALLED) BREAKER TRIP AIC RA'l1NG 1 15A-1P IDKAIC 2 2UA»2P 10K Alc 13 15A—1P 1OKAIC

NOT SCALE

USE LOAD
PORTABLELIGHTFIXTURE 18 3 VA
X
(2) GFG RECEPTMILES 360 VAX
ELEC WALLHEATER /AC UNIT 1500 VA
X
120V SMOKE DETECTOR 3 VA
X
TOTAL @ 120
V
[I2 Cu
— BLACK(HOT),90 DEC PVCINSULATION, UNLESSNOTEDOTHERWISE [I2 Cu
— WHITE(NEUTRAL) 90 DEG.PVCINSULATION, UNLESSNOTEDOTHERWISE [I2 Cu
— BARE(GROUND), UNLESSNOTEDOTHERWISE
SCALE: NOT TO SCALE
ELECTRICAL EOUPMENTINPANELASSEMBLY (PATEL WIRING.FITTNGS, ETC )ARE ULLISTED.AND IS DESKBNEDTO MEET FEDERALANDSTATE OODES.INCLUDINGTHE LATEST AIJDITIONS OF:

NATIONALFIREPROTECTION ASSOCIATION
2017 - NATIONALELECTRICAL CODE
2018 - INTERNATDNALBULDNG CODE UNDERVIRITERS LABORATORES

THE SERVICEINSTALLATIONANDGROUNDNGSHALLBE BYCUSTOMERANDNSTALLEDBYA LICENSED ELECTRICIANALLVIDRKSHALLCOMPLYWITHAUJITIONALREOUIREMBTTSOF LOCALCOEES.

ADDITDNALSTATE ANDLOCALCODEREQUREMENTS FOR NSTALLATION SHALL BE BYCUSTOMER CABLE SUPPORT INPANELASSEMBLY SHALL COMPLYWITHNEC$4 30 - SECURINGANDSUPPORTING

NMCABLE
CUSTOMER TO PROVIDE ANEQUPMENT GROUNDING CONDUCTOR ANDGROUNDNG ELECTRODE SYSTEMINCOMPLIANCEWI'THNEC250 32 - BULDNG OR STRUCTURESSUPPUEDBYA FEEDERIS) OR BRANCHCRCUTT(S). 19015 36:}: Avenue West, Suite
E
Lynnwaod, Waahingtun 98036 Him: (428 775-1799FAX(425)TM-9570

1.585
9 VA

15.7 AMPS
3/17/2021 REVISED
A 8/81/2021 USB PORTS
02/05/2021
AB
BB
20039
mi: February 5th, 2021
stunuan
LOAD CALCULATION:20AMP.120V.1PH, 3w WIRING KEY GENERAL NOTES Elect-lealconulhnts, Inc.

PROJECT: PAlJ.ET SHELTERS

PANEL ASSEMBLY- WIRING DIAGRAM

PANEL ASSEMBLY - WIRING DIAGRAM
129:’:
= 22
9 VA -NFPA
100%
= 360
0 VA -NEG
= 1.500
0 VA -|3C
10056
= 3 0 VA -UL

EXTERIORWALL

ALTERNATE OVERHEADSERVICE- BYCUSTOMER
’.‘I‘EATHERPRUOF
J- BOX
— BYCUSTOMER
1/4 INSULATED GROUNDING
BUSHING» BY CUSTOMER
SERVICEWlRING,='CCNDl,|IlTjp‘ ANDCUNNECTIGNTo PANEL
er CUSTOMER—
(MINIMUM3cAMI=s, MEI.)

PANELASSEMBLY WALL
5;‘5'

Z SCREW

NM CABLELOCKING

CONNECTOR
3,-‘A‘LOCKNUTSr {TUSTOMER
5/4' CLOSE

THREADEDNIPPLE HYCUSTOMER

WALLHEATER
NMCABLESUPPORT— PER NECEMASO
(TYPICAL)
Ox
IA/2

TAMPERRESISTANT
I-1/2
nocu
LABEUNGPERNEC405
4 NMCABLESUPPORT— PER NEC354-10
(TYPICAL)
PORTABLEAIR CONDITIONERRECEPTACLE- 5.000BTU(OR 3.00::BTU).EST 950V-\ 20 AMPRATED 12/2
NOTE:RECEPTACLESSHOWNAREREPRESENTATIVE ANDMAYCHANCESHAPEANDCOLOR DEPENDINGUPONSUPPLYCHAINAVAILABILITY PANEL— IUD AMP 2-an,-=I2ov1 PH. 3 w 5“ NOTE5 TUKAIC K
I.4.I i
.4C: u:
‘S8 L) E; 3; 5
5A 5A
UL LISTEDNM CABLE CONNECTOR— BY

SUPPLIER(TYPICAL)

EGAMFRATEDTOCGLE

SELECTORSWITCH
WALLHEATER— ISOUVAIZOV

NEUTRALBAR
SERVICEWIRING. CCNDUIT,CDNNEFTING
T0 PANEL- BY

CUSTOMER
(MINIMUMSGAMP, ?IUCu)
PROVIDEWTH USE P(.-TITS

NM CABLESUPPORT
SHALLBE IIITIIIN I2‘ or ENTRYTDDEV|CE- PER NEC
33: so (TYPICAL)
TAMFEI?RESISTANT
NM—E
“/2

NOTE WIREROUTINGIS REPRESENTATIVEAND MAY CHANCEAS A RESULTOF ACTUAL AFCIBREAKERCHOSE ELTUIPMENT CROUNDINGCONDUCTOR- Ev CUSTOMERMINIMUM(2) ;','5Cu OR OTHERWISEREQUIRED

BY THELOCALAHJ

CUSTOMERTOPROVIDECROLINDINC
ELECTRODESVSTEM- As REQUIRED
Bv STATEANDLOCALJURISDICTIONS
(MINIMUM[2] 3/II"x I0'—a" GROUNDRODS)

NON- METALLIC

CUNDUITFITTING
IZOV
SMOKEALARMWIT BATTERYBACKUP H - EV’SUPPLIER

ROUNDPVC
SURFACEMOUNTE OUTLETBOXD — BY

SUPPLIER
PANEL I] U

IOK WK WCK IUK

AIC NC AIC NC

Page 56 of 65 ends

14.B

Page 331 of 2213 ends
Page 57 of 65 ends

14.B

Page 332 of 2213 ends

L,
Hltnannuvuzusal
eauucavv-u'u.u
rm-ncum Iran
...a I:-mun-n numa mum mmmm
an
ua
sum
mu
avwu
CKL Mn
12OI2DB~24OV. 1 Ph. 3W
Jescrhtion/ nrsfnn
General (NUT-Callinums) Llming Razaptnclas -la10 KVA
our 10 KVA
Kilchun Hnuing Mala’: Llvgul Mala! Waur Hontnr Cominuoun Gcnoml Loud IOOABus 3DAMP
M
C
B
C B. NA

2.800 VA

2.560 VA
Canneclod Subbd Loads Lands 5
3,700O 1 360 D O OOOOOOD00

STALL(I
PLUG5: CORD
ToIn| Loett Dunund Facla 100%
125%
|OO"b 50%
100%
100%
100%
I25%
125%
125%
Domnnd Lmd 3.700
2,075

TAMPERESISTANT
OFC

TAMPERESISTANT
EOUIPMENTQROUNDINGCONDUCTOR- BYCUSTOMERMINIMUM(2) [6 ON

OROTHERWISEROUIRED

BYTHELOCALAHJ

CUSTOMERTOPROVIDEGROUNDING
ELECTRODESYSTEM— AS REOUIRED
av STATEANDLOCALJURISDICTIONS
(MINIMUM[2] 3/4'
x ID'—D' GROUNDRODS)
13-Sep-21 on
[T2 Cu
[I2 Cu
[I2 Cu

WIRING KEY

EIARE(GROUND), UNLESSNOTEDOTHERWISE
BLACK(PHASEA). 90 DEC PVCINSULATION. UNLESSNOTEDOTHERWISE WHITE(NEUTRAL) 90 DEC.PVCINSULATION. UNLESSNOTEDOTHERWISE [I2 Cu
— RED(PHASEB), 90 DECPVCINSULATIONUNLESSNOTEDOTHERWISE.

LOADCALCULATION SHOVMIS

A REPRESENTATION ONLY, ANDIS THEFUNCTION
OF VOLTAGE(EITHERZOBV,OR 240V),ANDOF THEACTUALA/CUNITCHOSEN

THE FINALLOADCALCULATIONWILLBE DEVELOPEDUPONCUSTOMERSFINAL SELECTIONOF VOLTAGE,AND A/CUNIT. THE INSTALLINGCONTRACTORIS REQUIREDTO MEETNECANDANYADDITIONALLOCALCODEREOUIREMENTS AS

PARTOF THE INSTALLATIONANDPERMITTING
PANEL— Ioo AMP
240/120v,IPH, aw
10K AIC
50A/2P 3 MAIN
IOKAlc
20A IOK HAcR AIC
7 SPACE
II I"' ' ' ' ' ‘I
20A
20A HACR
ZDA
HACR
IOK
AIC

IOK AIC
IOK
AIC

SERVICE CONDUIT, TOPANEL- BY

CUSTOMER

SIZEDTONECEL LOCALCODES

CIRCUIT

GENERAL NOTES

1. ELECTRICALEQUPMENTN PANELASSEMBLY(PANEL. WIRING, FITTNGS. ETC ) ARE UL LISTED, AND IS DESIGNEDTO MEETFEDERALAMI) STATE CODES NCLUDING THE LATEST ADDITIONSOF:
-NFPA
-NEC
-ac
-UL

EXTERIORLIGHTS
11, :2 (TYPICAL)
HS/MS

TAMPERESISTANT
GFCI

TAMPERRESISTANT / LT
120V.20W
>2:

PLUG& CORD

DETAIL NOTES

LIGHTSTOBECONTROLLEDBY
L.

NOTE:WIREROUTINGIS REPRESENTATIVE AND MAYCHANGECONDUITFILLANDROUTINGEV CONTRACTOR A PHASE(BLACK) 3 PHASE(RED) GROUND(GREEN) cm = GROUNDFAULTCIRCUITINTERRUPTER HS/MS= HUMIDITYSENSOR/MOTION SENSORSWIT HTR= HEATER CH LT
= LIGHT MCE= MAINCIRCUITBREAKER N = NEUTRAL(WHITE) REC= RECEPTACLE ABG STALLI12
Fl FCTRICAI PANFI . 7 STAI I 3 1 SIM
Q??
11 EFACE
IOTES:ALLCIRCUIT BREAKERS ARE H?CR TYPE
\EATHQPROOF I SERVICE RATE PANEL
INTERIORLIGHTS20 WA1'|'S EACH (MAXIMUM)
G
D
7|‘!
7!]
WI M
In
70 Total Demand Load:
’ROJECT: PALLETSHELTERS RESTROOM
180 JGIFANS

A EXTERIOR LTG
500
960 Ii
10DG '53 WATER IIITIICONTROL 1 no G EFCI RECEFT - EXTERIOR 10 war: 43

5.8 KVA
AB
EA
21007
2021
ulna:

PANEL SCHEDULE
G {TR - NC IJNITSTALLI -
PROJECT: PAlJ.E|' SHELTERS 2 STALLRESTROOM-
(GAS WATER
HEATER) 2 STALL RESTROOM - GAS WATER
HEATER
Load Load
C
B
C
B
C
B Load L031 DasorbtionI Tvna Amn Pal; Phase Amn Pole NAI Tvne .ncaInn No Mm Inc‘ 19015 36th Avenue West, Suit: E NATIONAL FIREPROTECTIONASSOCIATION Lyn.-|wggd_ waghjngggn 93035 NATIONALELECTRICAL CODE Flame [415]775-1799FAX(425)TM-9870 1 NTERNATDNALHJLDNG CODE 3 UNDERIARITERSLABORATORES 2 THE SERVICE NSTALLATION ANDGROUIDNG SHALLBE BYCUSTOMERANDNSTALLEDBYA LKIENSED ELECTRICIAN ALLVIDRKSHALLCOMPLVWITHADDITIONALREQUIREMENTSOF LOCALCODES Connected Luad: Ph A Connected Load: Ph 3
55>> 3 ADDITIONALSTATE ANDLOCALCODE REQUIREMENTSFOR INSTALLATDNSHALLBE BYCUSTOMER 4 CABLE SUPPORT INFANELASSEMBLY SHALL COMPLY WITHNEC 334.30 - SECLRING ANDSUPPORTING 5 4 KVA

NMCABLE

5. CUSTOMERTO PROVIDEANEOUIPMBITGROUNDNGCONDUCTORAND GROUNDNG ELECTRODE SYSTEMINCOMPLIANCEWITHDEC250.32 - BULDINGDR STRUCTLRES SLIPPLEDBY A FEEDER(S) OR BRANCHClRCUIT(S)
VJRING. CONNECTING
20W 20W 5 360 VA VA 5 360 VA 5 715 VA 2 :

HACR
9/13/2021

EXTERIORECEPTACLE WEATHERPROOF TAMPERESISTANT GASWATERHEATER

CONTROLS
COMBOAlc 11HEATER- 960W.120V COMBOA/C& HEATER- 960W, IZOV SCALE: NOT TO SCALE
wwwmwunlaccum
@ AWA.INC.
?eso
FAN
30 Tl ____l
L___J

Page 58 of 65 ends

14.B

Page 333 of 2213 ends

I

Page 59 of 65 ends

14.B

Page 334 of 2213 ends

1,"...
4 CITY OF HEMET
Hemet, California
4 RESOLUTION NO. 4837
5 A RESOLUTION OF THE CITY COUNCIL OF THE CITY
6 OF HEMET, OF THE STATE OF CALIFORNIA
7 DECLARING A SHELTER CRISIS PURSUANT TO
SENATE BILL 850 AND GOVERNMENT CODE § 8698. 2
8 9 WHEREAS, California' s Governor Edmund G. Brown, Jr. and the members of the 12130California Legislature have recognized the urgent and immediate need for funding at th 11 local level to combat homelessness; and
12 WHEREAS, the Governor and Legislature have provided funding to loca 13 governments under the Homeless Emergency Aid Program as part of SB 850 and th 14 2018- 19 Budget Act ( Chapter 48, Statutes of 2018); and 15 - WHEREAS, the Governor and Legislature require jurisdictions seeking a 16 allocation through the Homeless Emergency Aid Program to declare a Shelter Crisi 17 pursuant to Government Code § 8698. 2; and
18 WHEREAS, the City of Hemet finds that the 2018 Point in Time Count showe•. 19 83 persons within the City of Hemet and 2, 316 persons within the County of Riversid 20 are homeless; and
21 WHEREAS, the City of Hemet finds that the number of homeless is significant, 22 and these persons are without the ability to obtain shelter; and 23 WHEREAS, the City of Hemet finds that the health and safety of unsheltere• 24 persons in the City of Hemet is threatened by lack of shelter; and 25 WHEREAS, the City of Hemet affirms the City's commitment to combattin• 26 homelessness and creating or augmenting a continuum of shelter and service option27 for those living without shelter in our communities. 28 RN# 4848- 4772- 7475 vl 1

Page 60 of 65 ends

14.B

Page 335 of 2213 ends

NOW, THEREFORE, the City Council of the City of Hemet does hereby resolve that 2 the shelter crisis pursuant to Government Code § 8698. 2 exists in the City of Hemet and 3 authorizes the City of Hemet' s participation in the Homeless Emergency Aid Program. 4 5
PASSED, APPROVED, AND ADOPTED this 25th day of September, 2018. 6 7
Mich oul f Percif a or
9 ayor
ATTEST: APPROVED AS TO FORM:
11 12
1: On\lb'
13 Sarah McComas, City Clerk Eric S. Vail, City Attorney 14 15
16 17
19 20
21 22
23 24
25 26
27 28
RN# 4848- 4772- 7475 vl 2

Page 61 of 65 ends

14.B

Page 336 of 2213 ends

L
7°_
r
I:

RESOLUTION NO. 32Q3
s
1Q
11 12
I3
I4
15 16
17'
18 19
20 21
251
26'
27'
ARESOLU71pN OFTHECITYCOUNCIL OFTHECITYOFHEMET,

CALIFORNIA, ESTABLISHINGAPOLICYFORTHEOPERATIONOF
EMERGENCYSHELTERSAf DTRANSlTtONALHOUSINGFACILITIESINTHE CITYOFHEMET.

WHEREAS, theCityofHemeYs General Plan and1995 Consolidated Plan have established programs andstrategies toassist with thecreation ofemergency shelter andtransitional housing forthehomeless;
WHEREAS, theCityofHemet desires tominimize thesecondary impacts of emergencyshelterandtransitionalhousing;
WHEREAS, theoperational characteristics ofemergency shelters and transitional housing areacritical component intheestablishment ofapositive environment forhomeless persons such thatthey canbecome self- sufFicient and transitionbackintosociety; and,
WHEREAS, thecreation ofastructured environment forresidents of emergency shelters andtransitional housing through theadoption andenforcement ofoperationaf criteria willhelp tominimize thepotential secondary effects ofthe facility.

NOW, THEREFORE, BEITRESOLVEDthatiheCityCounciloftheCityof Hemet, doeshereby setthefollowing guidelines forestablishment ofemerger, cy sheltersandtransitionalhousing:

Filing Requirements. Theapplication foratransitional shelterlhousing facilityshalfincludethefoilowinginformation/ documentation:

2. 3.

Ciientprofilewhichidentifies theintended grouptobeserved, such assinglemen, families, developmentaily disabled, orothers.

Themaximum numberofoccupants andthefacility' shoursof
operation.

Thetype ofservices tobeproved, such asanemergency shelter, and theintendedlengthofstayallowedforeachgroupatthefacility.

Thesupport services tobemade available onoroff- siteand projected staffing levels.

5. Anidentification oftheproposed funding sources toconstruct and maintain thefacility.

Sitelocation Criteria. Inevaluating aproposed transitionai shelterlhousing facility thefollowing findings mustbemet:

Page 62 of 65 ends

14.B

Page 337 of 2213 ends

1 RESOWTION NO. 3203
PAGE 2

1. V

2. J
6 3.
7 9II

4. 1Q!
11 12
13 14I
15 16
17 18!
19 20
21 23
24 25
26 271
3 5.

Nosubstantially adverse imoacts must occur toadjoining properties orlanduses.

Noover- concentration ofshelterfacilities mustoccurintheimmediate area.

Adjacentdevelopmentmustnotconstituteahazardtoshelter
occupants.

Theestablishmentofthefacilitywillnotresultinharmtothehealth, safety, orgeneral welfare ofthesurrounding neighborhood.

Thefacilityshalibelocatedadjacentto, orwithineasywalking distanceof, publictransportationservices.

C. Facility Criteria. Thefacility shall beequipped and maintain thefollowing levelofservices which areappropriate fortheproper functioning ofthe proposed operation:

1. Laundry, shower, andrestroomfacilities. Ifinenandwomenare permittedinthefacility, thenseparaterestroomandshowerfacilities aretobeprovided.

2. Kitchen facilities anddining facilities. Said facilities aretobeofan adequatesizetoprepareandserveatleasttwo (2) mealsduringnot morethantwo (2) sittings toallpersons usingthefacility.

3. 4.

5. 6.

Office facilities/ space forthestaff andanyon- siteeducational orjob training program.

Anindicationofthenumber, type, anddurationofon- site, full- time andtemporary stafftobeprovided.

Anadequateoccupancyratiooffacilitysizetothenumberof
occupants based upon theadopted Uniform Building Code.

ProjectshallcomplywithallapplicableprovisionsoftheStateCodes, including, butnotlimitedto, Building, FireandHandicapped.

D. Operational Criteria. Thefacility shallprovide andmaintain thefollowing levelofservices which areappropriate fortheproper functioning ofthe proposedoperation:

1. Support services provided either onand/ oroff- site, including, butnot limitedto, ci ugandalcoholrehabilitation, educationalprograms, and

Page 63 of 65 ends

14.B

Page 338 of 2213 ends

RESOLUTION NO. 3203
PAGE3
jobplacement. Iftheseservicesaretobeprovidedbyotheragencies orgroups, then agreements ormemorandums ofunderstanding are tobeprovidedtotheCity.

2. Acontract withtheRiverside Couniy Departmenl ofCommunity ActionDepartment, orotherentityapprovedbytheCity, toensure compliancewiththeprovisionsofthisSectionandanyconditionsof approval.
9 10
i
11 I2
13 14
15 I61
I7
18 19
20 21
2425
26 7
s

3. Programsandinternalprocesseswhichprovidefortheinitial interoiew andscreening ofindividuals entering thefacility, rulesand regulationswhicheachresidentmustcomplywith, goalsforthe eventualreocation ofresidents outofthefacility, andaprocess whereby theresident isaccountable totheowneNoperator forhis/ her locationandconduct.

4. Afundingsource( s) availabletomaintainthefacility.

5. Amethod ofensuring thecleanliness ofthefacility through acontract orotheracceptablemethod.

6. Anidentificationofascheduleforcompfetingallofthefacilityand operational criteria required bySections CandDabove.

E. DevelopmentStandards. Thefacilityshailmeetthefollowingstandards, based upon theproposed operational characteristics ofthefacility:

Sufficienton- siteparking, asdeterminedbythePlanning
Commission.

2. Sufficientoutdooropenspaceand/ orrecreationalfacilities.

F. Application Procedure. Requests foremergency shelterortransitional housingfacilitiesshallbeprocessedasaconditionalusepermitconsistent withtheprovisions ofArticleXLIVoftheCity' sZoningOrdinance.

Page 64 of 65 ends

14.B

Page 339 of 2213 ends

s
1I
UI
6 7
8 9
l0Iil
RESOLUTION NO. 3203
PAGE4
MOVED, PASSED, AND ADOPTED attheregular meeting ofJani ary72, 1996bythe4o! lowingvote:

AYES: CouncilMembersLowe, Schroeder, Tandy, VenableandVanArsdale NOES: None
ABSTAIN: None
ABSENT: None J7''
iST'fErT:

QL 3 .i "iRyy_ -` G.l—
ren aWackerle, CityClerk
14 15
16 17'
18 19
21 51
26I
iii rii% 1t
I i
II// /, IIII e III+ I` I/.
r..- I
s

Page 65 of 65 ends

14.B

Page 340 of 2213 ends

City of Hemet
City Council Meeting

STAFF REPORT
Meeting: City Council Meeting - Aug 09 2022
Department: Public Works
Submitted by: Eddie Pust, Interim City Manager
Noah Rau, Public Works Director/City Engineer, Steve Loriso; ☐ Receive and File ☐ Consent Calendar ☐ Business Item ☒ Public Hearing TITLE:

Public Hearing to Consider Establishing City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos), to Establish an Appropriations Limit, Therefore, to Authorize the Submittal of the Levy of Special Taxes, to Submit the Establishment of an Appropriations Limit to the Qualified Electors of Such Community Facilities District; Calling a Special Election and Submitting to the Qualified Electors of City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) Propositions Regarding the Establishment of an Appropriations Limit and the Annual Levy of a Special Tax Within the Community Facilities District; and, Declaring the Results of a Special Election in City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) and Directing the Recording of a Notice of Special Tax Lien, generally located between Warren Road, Celeste Road and Rose Road (DR Horton) RECOMMENDED ACTION:

It is respectfully recommended that the City Council:

1. Open the Public Hearing and take testimony, if any; and,

2. Adopt a Resolution of the City Council of the City of Hemet, California, to establish City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos), to establish an appropriations limit therefore, to authorize the submittal of the levy of special taxes, and to submit the establishment of an appropriations limit, to the qualified electors of such Community Facilities District; and,

3. Adopt a Resolution of the City Council of the City of Hemet, California, calling a special election and submitting to the qualified electors of City of Hemet Community Facilities District No. 2022- 01 (Tres Cerritos) propositions regarding the establishment of an appropriations limit and the annual levy of a special tax within the Community Facilities District; and

4. Adopt a Resolution of the City Council of the City of Hemet, California, declaring the results of a special election in City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) and directing the recording of a notice of special tax lien; and

5. Waive full reading, read by title only, and introduce an Ordinance entitled, An Ordinance of the City Council of the City of Hemet, California, acting in its capacity as the legislative body of City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) authorizing the levy of a special tax therein.

BACKGROUND:

Page 1 of 89 ends

14.C

Page 341 of 2213 ends

On July 12, 2022, the City Council took the first step in the process of forming CFD 2022-01 (Tres Cerritos) (“CFD No. 2022-01”). At that time the City Council approved a Resolution of Intention, Resolution No. 2022-133, to form CFD No. 2022-01 and to authorize the levy of a special tax. At that meeting the City Council set August 9, 2022, as the date for this public hearing.

The State Legislature enacted the Mello-Roos Act of 1982 (the “Act”) to assist public agencies in financing certain public services. The developer, D.R. Horton Holding Company, Inc. (D.R. Horton), requested that the City assist them in forming a district in order to cover the costs associated with the maintenance of public improvements within the proposed project area which is projected to include 176 single-family units, one (1) park, three (3) basins, and vernal pools at buildout. The CFD was formed for:
• Street lights maintenance including energy charges, operation, maintenance and administrative costs of in-tract streetlights within the boundaries of the CFD and off-site streetlights; • Conduct the maintenance of park landscaping and park facilities. • Conduct the maintenance of landscaping, including streetscape and slopes specifically identified within the CFD;
• Conduct the maintenance of vernal pools including annual inspection, annual governmental reporting and annual maintenance, including but not limited to removal of debris, plant control/removal and restoration as required
• Conduct the maintenance, administration and inspections of stormwater facilities and BMPs including water quality basins, channel and any other NPDES/WQMP/BMP related devices; • Conduct litter and graffiti removal on soundwalls and other amenities, plus normal painting as required, within the CFD;
• All other services necessary or useful for, or in connection with, the authorized services listed above, including building a reserve fund for replacement; and • Levy and collect the special tax to fund these services.

The proposed district shall be composed of Special Tax A and Special Tax B. Special Tax A provides funding for maintenance and operation of authorized facilities that are not funded by Special Tax B, including streetlights and vernal pools. Special Tax B provides funding for maintenance and operation of (i) landscaping maintenance of streetscapes and slopes, (ii) park landscaping and facilities maintenance, (iii) stormwater facilities (drainage basins) including landscaping maintenance, (iv) fuel modification and (v) graffiti abatement. Maintenance of the Special Tax B improvements shall be the responsibility of the Property Owner’s Association pursuant to a Dormancy Agreement with the City.

The Dormancy Agreement states that Special Tax B shall not be levied in any year, unless and until, the City determines that the Special Tax B improvements have not been maintained by the Property Owner’s Association to a standard acceptable to the City.

ANALYSIS:

Special Tax A will have a Maximum Special Tax equal to $320.00 for Special Tax A and $552.00 for Special Tax B, per taxable unit per year for Single Family Residential Property, $224.00 for Special Tax A and $386.00 for Special Tax B, per taxable unit per year for Condominium Residential Property and $1,680.00 for Special Tax A and $2,894.00 for Special Tax B, per acre per year for Multifamily Residential, Non-Residential Property and Undeveloped. The Maximum Special Tax rates shall

Page 2 of 89 ends

14.C

Page 342 of 2213 ends

increase annually based on the percentage increase in the Consumer Price Index each March, with a maximum annual increase of 6% and a minimum annual increase of 2%.

PREVIOUS COUNCIL ACTION:
• On August 23, 2005, the City Council considered and approved goals and policies concerning Community Facility Districts.
• On July 12, 2022, the City Council adopted Resolution 2021-133, Resolution of Intention (ROI) to establish City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) STRATEGIC PLAN INTEGRATION:

GOAL ONE: QUALITY OF LIFE:

To ensure that Hemet is safe, clean, attractive and comfortable for all who live, work, and visit.

The implementation of this CFD will enhance the visual appearance of the community to make it attractive and reduce blight.

GOAL THREE: COMMUNITY ENGAGEMENT
To connect and participate in a constant dialogue between members of the community, City staff, and elected officials to promote togetherness and positivity.

Through the implementation of this CFD, maintenance of public infrastructure is ensured, which can increase the community's pride within the City.

FISCAL IMPACT:

There is no impact to the General Fund with this action. The individual property owners are responsible for the annual payments of special taxes. The City will work with the County concerning the filing of the annual special tax to the County Auditor-Controller.

The property owners have filed a petition representing their willingness to move forward and have submitted a deposit to pay for City costs incurred in connection with the formation of the District. After the district is formed, a special tax lien will be recorded on the property within the District and the individual property owners shall be responsible for the annual payments of special taxes. The City will file the annual special tax to be collected with the County Auditor-Controller for placement on the property tax bills. The City’s cost to administer CFD No. 2022-01 annually will be reimbursed through the special taxes charged to property owners. The revenue from the annual special tax will be deposited into a fund for CFD No. 2022-01 and will be used to pay said administrative expenses and for the maintenance services listed above. No parcels in the District will be taxed for FY 2022-2023, therefore, it is expected both the revenue and expenses will be part of the City’s FY 2023-2024 Adopted Budget.

ALTERNATIVE(S):

1. Do not adopt the Resolution of Formation (ROF) or other resolutions associated with this Public Hearing for City of Hemet Community Facilities District No. 2022-01.

2. Provide alternate directions to staff.

ATTACHMENT(S):

Attachment 1 - Resolution - CFD 2022-01_ROF

Page 3 of 89 ends

14.C

Page 343 of 2213 ends

Attachment 2 - Resolution - CFD 2022-01_Call_Election
Attachment 3 - Resolution - CFD 2022-01_Declare_Election_results Attachment 4 CFD REPORT CFD 2022-01(TresCerritos)
Attachment 5 - CFD 2022-01-TresCerritos_Ordinance
Hemet_CFD2022-01(TresCerritos)_boundarymapCORRECTED-RECORDED

Page 4 of 89 ends

14.C

Page 344 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

CITY OF HEMET
Hemet, California
RESOLUTION NO. 2022-XXX

A RESOLUTION OF FORMATION OF

THE CITY COUNCIL OF THE CITY OF

HEMET, CALIFORNIA, TO ESTABLISH

CITY OF HEMET COMMUNITY
FACILITIES DISTRICT NO. 2022-01
(TRES CERRITOS), TO ESTABLISH AN

APPROPRIATIONS LIMIT THEREFORE,

TO AUTHORIZE THE SUBMITTAL OF

THE LEVY OF SPECIAL TAXES, AND

TO SUBMIT THE ESTABLISHMENT OF

AN APPROPRIATIONS LIMIT, TO THE

QUALIFIED ELECTORS OF SUCH

COMMUNITY FACILITIES DISTRICT
WHEREAS, on July 12, 2022, the City Council
adopted a resolution entitled “A Resolution of Intention of the City Council of the City of Hemet, California, to Establish City of Hemet Community Facilities District
No. 2022-01 (Tres Cerritos) and to authorize the Levy
of a Special Tax within City of Hemet Community
Facilities District No. 2022-01 (Tres Cerritos)” (the
“Resolution of Intention”) Resolution No. 2022-133,
stating its intention to form Community Facilities District No. 2022-01 (Tres Cerritos) (the “CFD”), of the City
pursuant to Chapter 2.5 of Part 1 of Division 2 of Title 5, commencing with Section 53311, of the California

Page 5 of 89 ends

14.C

Page 345 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
Government Code (the “Act”) to finance certain services to serve the CFD (the “Services”);
WHEREAS, the Resolution of Intention, setting
forth a description of the proposed boundaries of the
CFD, Services to be financed by the CFD, including
incidental expenses, and the rate and method of
apportionment (the “Rate and Method”) of the special
tax (the “Special Tax”) to be levied within the CFD to
pay for the Services, is on file with the City Clerk and the provisions thereof are incorporated herein by this
reference as if fully set forth herein;
WHEREAS, the Resolution of Intention set
August 9, 2022 at 7:00 p.m., or as soon thereafter as
practical, as the date for a public hearing on the
establishment of the CFD, the extent of the CFD, the
furnishing of the Services within the CFD, and the
proposed Rate and Method;
WHEREAS, on this date, this Council held a
noticed public hearing as required by the Act and the
Resolutions of Intention relative to the proposed
formation of the CFD;
WHEREAS, at the hearing all interested persons
desiring to be heard for or against the establishment of the CFD, the extent of the CFD, the furnishing of the

Page 6 of 89 ends

14.C

Page 346 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
Services and the Rate and Method were heard and a
full and fair hearing was held;
WHEREAS, at the hearing evidence was
presented to this Council on such matters before it,
including a special report (the “CFD Report”) as to the Services to be provided through the CFD and the costs
thereof, a copy of which is on file with the City Clerk, and this Council, at the conclusion of said hearing, is fully advised in the premises;
WHEREAS, written protests with respect to the
formation of the CFD, the furnishing of specified types of services and the Rate and Method have not been
filed with the City Clerk by fifty percent (50%) or more of the registered voters residing within the territory of the CFD or property owners of one-half (1/2) or more of the area of land within the CFD and not exempt from the
proposed special taxes; and
WHEREAS, the Special Tax proposed to be
levied in the CFD to pay for the proposed services has
not been eliminated by protest by fifty percent (50%) or more of the registered voters residing within the territory of the CFD or the owners of one-half (1/2) or more of
the area of land within the CFD and not exempt from
the special taxes.

Page 7 of 89 ends

14.C

Page 347 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
WHEREAS, City Staff reviewed the proposed
CFD formation and determined that forming the CFD
and financing the Services, as described in Section 7 of this Resolution, does not constitute a project for
purposes of the California Environmental Quality Act,
commencing with Section 21000 of the California Public
Resources Code and the California Environmental
Quality Act Guidelines, Article 5 of Chapter 3 of Division 6 of Title 14 of the California Code of Regulations,
(collectively “CEQA”). CEQA Guidelines Section 15378
specifically state that the term “project” for CEQA
purposes does not include “continuing administrative or maintenance activities” or “the creation of government
funding mechanisms or other government fiscal
activities which do not involve any commitment to any
specific project which may result in a potentially
significant physical impact on the environment.” (CEQA
Guidelines §§ 15378 (b)(2) and (b)(4).)
WHEREAS, the CFD is intended to fund street
light and pedestrian lights, landscaping, stormwater and water quality basin maintenance services, and litter and graffiti removal on sound walls and other amenities,
plus normal painting as required within the District, all other services necessary or useful for, or in connection

Page 8 of 89 ends

14.C

Page 348 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
with, the foregoing services, including building a
reserve fund for replacement, which constitute
administrative and maintenance functions of the City.

Further, establishment of a revenue stream to fund
ongoing services does not involve commitment to any
specific project that would have a potentially significant impact on the environment because the funds would
not be used to construct new or expand existing
facilities.

WHEREAS, in addition to the foregoing,
because the project is a financing mechanism to fund
ongoing administrative and maintenance operations, it
can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, and therefore is exempt from
CEQA’s provisions. (CEQA Guidelines §15061(b)(3).)

NOW, THEREFORE, THE CITY COUNCIL OF

THE CITY OF HEMET HEREBY RESOLVES AS
FOLLOWS:

1. Recitals Correct. The foregoing
recitals are true and correct.

2. Public Hearing. On August 9, 2022,
pursuant to notice thereof duly given as provided by
law, the City Council held a public hearing with respect

Page 9 of 89 ends

14.C

Page 349 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
to the establishment of the CFD and the annual levying
of the Special Tax within the CFD to pay for the
Services.

3. No Majority Protest. The proposed
Special Tax to be levied within the CFD has not been
precluded by majority protest pursuant to section 53324 of the Act.

4. Prior Proceedings Valid. All prior
proceedings taken by this City Council in connection
with the establishment of the CFD and the levy of the
Special Tax have been duly considered and are hereby
found and determined to be valid and in conformity with the Act.

5. Name of the District. The community
facilities district designated “City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos)” of the City is hereby established pursuant to the Act.

6. Boundaries of the District. The
Resolutions of Intention provide the boundaries of the
territory proposed for inclusion in the CFD, as set forth in the map of the CFD heretofore recorded in the
Riverside County Recorder’s Office on July 26, 2022, in Book 89 at Page 30 as Instrument No. 2022-0332299 of

Page 10 of 89 ends

14.C

Page 350 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
Maps of Assessment and Community Facilities
Districts.

7. Description of Services. The Services
proposed to be financed by the CFD and pursuant to
the Act shall consist of those items shown in Exhibit “A” hereto and by this reference incorporated herein.

8. Special Tax.
a. Except to the extent that funds
are otherwise available to the CFD to pay for the
Services, a Special Tax sufficient to pay the
costs thereof, secured by the recordation of a
continuing lien against all non-exempt real
property in the CFD, is intended to be levied
annually within the CFD, and collected in the
same manner as ordinary ad valorem property
taxes or in such other manner as may be
prescribed by this Council.
b. The proposed Rate and Method,
in sufficient detail to allow each landowner within
the proposed CFD to estimate the maximum
amount such owner will have to pay, is shown in
Exhibit “B” attached hereto and hereby
incorporated herein.

Page 11 of 89 ends

14.C

Page 351 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

9. Report. The CFD Report is hereby
approved and is made a part of the record of the public hearing regarding the formation of the CFD, and is
ordered to be kept on file with the City Clerk as part of the transcript of these proceedings.

10. Responsible Official. The Finance
Director of the City of Hemet, located at City Hall, 445 East Florida Avenue, Hemet, CA 92543, telephone
number (951) 765-2300, is the officer of the City who
will be responsible for preparing annually a current roll of the levy of the Special Tax obligations by assessor’s parcel number and who will be responsible for
estimating future levies of the Special Tax.

11. Tax Lien. Upon recordation of a notice
of special tax lien pursuant to Section 3114.5 of the
California Streets and Highways Code, a continuing lien to secure each levy of the Special Tax shall attach to all nonexempt real property in the CFD and this lien shall
continue in force and effect until the Special Tax
obligation is prepaid and permanently satisfied and the lien canceled in accordance with law or until collection of the Special Tax by the CFD ceases.

12. Description of Voting Procedures.

The voting procedures to be followed in conducting the

Page 12 of 89 ends

14.C

Page 352 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
special election (the “Special Election”) on the
proposition of the annual levy of the Special Tax and on the proposition to establish an appropriations limit for the CFD, if the CFD is established, shall be as follows:
a. If at least 12 persons have been
registered to vote within the territory of the CFD
for each of the 90 days preceding the close of
the public or protest hearing (the “protest
hearing”), the vote in the Special Election shall
be by the registered voters of the CFD with each
voter having one vote. In that event, the Special
Election shall be conducted by the City Clerk,
and shall be held on a date selected by the City
Council in conformance with the provisions of
Section 53326 of the Act and pursuant to the
provisions of the California Elections Code
governing elections of cities, insofar as they may
be applicable, and pursuant to said Section
53326 the ballots for the Special Election shall
be distributed to the qualified electors of the CFD
by mail with return postage prepaid or by
personal service, and the Special Election shall
be conducted as a mail ballot election.

Page 13 of 89 ends

14.C

Page 353 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
b. If 12 persons have not been
registered to vote within the territory of the CFD
for each of the 90 days preceding the close of
the protest hearing, the vote in the Special
Election is to be by the landowners of the CFD,
with each landowner of record at the close of the
protest hearing having one vote for each acre or
portion of an acre of land that he or she owns
within the CFD and the Special Election shall be
conducted by the City Clerk pursuant Section
53326 of the Act as follows:
(i) The Special
Election shall be held on the earliest date,
following the adoption by the City Council
of this Resolution and a resolution calling
the Special Election, to submit to the
qualified electors of the CFD the
propositions with respect to: (i) the levy of
Special Tax to finance the Services and
(ii) the establishment of an appropriations
limit for the CFD.
(ii) Pursuant to said
Section 53326, the Special Election may
be held earlier than 90 days following the

Page 14 of 89 ends

14.C

Page 354 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
close of the protest hearing if the qualified
electors of the CFD waive the time limits
for conducting the elections set forth in
said Section 53326 by unanimous written
consent and the Clerk concurs in such
earlier election date as shall be consented
to by the qualified electors.
(iii) Pursuant to said
Section 53326, ballots for the Special
Election shall be distributed to the
qualified electors by the Clerk by mail with
return postage prepaid, or by personal
service.
(iv) Pursuant to
applicable sections of the California
Elections Code governing the conduct of
mail ballot elections of cities, the City
Clerk shall mail (or deliver) to each
qualified elector an official ballot and shall
also mail to all such qualified electors a
ballot pamphlet and instructions to voter,
including a sample ballot identical in form
to the official ballot but identified as a
sample ballot, a return identification

Page 15 of 89 ends

14.C

Page 355 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
envelope with prepaid postage thereon
addressed to the City Clerk for the return
of voted official ballots, and a copy of this
Resolution and the exhibits hereto;
provided, however, that analysis and
arguments regarding the ballot measure
may be waived with the unanimous
consent of all the landowners, and in such
event a finding regarding such waivers
shall be made in the resolution adopted
by the City Council calling the Special
Election.
(v) The official ballot to
be mailed (or delivered) by the Clerk to
each landowner shall have printed or
typed thereon the name of the landowner
and the number of votes to be voted by
the landowner and shall have appended
to it a certification to be signed by the
person voting the official ballot which shall
certify that the person signing the
certification is the person who voted the
official ballot, and if the landowner is other
than a natural person, that he or she is an

Page 16 of 89 ends

14.C

Page 356 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
officer of or other person affiliated with the
landowner entitled to vote such official
ballot, that he or she has been authorized
to vote such official ballot on behalf of the
landowner, that in voting such official
ballot it was his or her intent, as well as
the intent of the landowner, to vote all
votes to which the landowner is entitled
based on its land ownership on the
propositions set forth in the official ballot
as marked thereon in the voting square
opposite each such proposition, and
further certifying as to the acreage of the
landowner's land ownership within the
CFD.
(vi) The return
identification envelope delivered by the
Clerk to each landowner shall have
printed or typed thereon the following: (i)
the name of the landowner, (ii) the
address of the landowner, (iii) a
declaration under penalty of perjury
stating that the voter is the landowner or
the authorized representative of the

Page 17 of 89 ends

14.C

Page 357 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
landowner entitled to vote the enclosed
ballot and is the person whose name
appears on the identification envelope,
(iv) the printed name and signature of the
voter, (v) the address of the voter, (vi) the
date of signing and place of execution of
said declaration, and (vii) a notice that the
envelope contains an official ballot and is
to be opened only by the Clerk.
(vii) The instruction to
voter form to be mailed by the Clerk to the
landowners shall inform them that the
official ballots shall be returned to the
Clerk properly voted as provided thereon
and with the certification appended
thereto properly completed and signed in
the sealed return identification envelope
with the certification thereon completed
and signed and all other information to be
inserted thereon properly inserted no later
than 7:00 p.m. on the date of the Special
Election, or immediately after the
Resolution Calling the Special Election is
adopted.

Page 18 of 89 ends

14.C

Page 358 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
(viii) Upon receipt of the
return identification envelopes, which are
returned prior to the voting deadline on
the date of the Special Election, the Clerk
shall canvass the votes cast in the Special
Election, and shall file a statement with
the City Council as to the results of such
canvass and the election on each
proposition set forth in the official ballot.

13. Exempt Property. Except as provided in
Section 53340.1 of the Act and except for properties
that a local agency is a landowner of within the
meaning of subdivision (f) of Section 53317 of the Act, pursuant to Section 53340 of the Act, properties of
entities of the state, federal and local governments shall be exempt from the levy of the Special Tax. Reference
is hereby made to the Rate and Method for a
description of other properties or entities that are
expressly exempted from the levy of the Special Tax.

14. Appropriations Limit. An appropriations limit
for the CFD is hereby established, subject to voter
approval, as an amount equal to 300 percent of all the
proceeds of the Special Tax collected annually within
such CFD and as defined by Article XIIIB of the

Page 19 of 89 ends

14.C

Page 359 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
California Constitution, as adjusted for changes in the cost of living and changes in population.

15. Special Tax Accountability Measures.

Pursuant to and in compliance with the provisions of
Government Code Section 50075.1, the City Council
hereby establishes the following accountability
measures pertaining to the levy by the CFD of the
Special Tax described in Section 8 above:
a. The Special Tax shall be levied
for the specific purposes set forth in Section 7
hereof.
b. The proceeds of the levy of the
Special Tax shall be applied only to the specific
purposes set forth in Section 7 hereof.
c. The CFD shall establish an
account or accounts into which the proceeds of
such Special Tax shall be deposited.
d. The City Manager, or his or her
designee, acting for and on behalf of the CFD,
shall annually file a report with the City Council
as required pursuant to Government Code
Section 50075.3.

16. CEQA. The City Council hereby finds that the
CFD formation involves creation of a funding

Page 20 of 89 ends

14.C

Page 360 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
mechanism for certain ongoing service and
maintenance activities that do not have any potential for significantly impacting the environment. Further, the
City Council hereby finds that it can be seen with
certainty that the proposed financing mechanism and
services funded thereby have no possibility of resulting in a significant effect on the environment. Therefore,
the City Council, in its independent judgment, finds that the project is exempt from CEQA, and hereby directs
City Staff to prepare and file a Notice of Exemption with the County Clerk within five days of adoption of this
Resolution pursuant to Section 21152 of the California
Public Resources Code and Section 15062 of the
CEQA Guidelines.

17. Effective Date. This resolution shall take
effect upon its adoption.

PASSED, APPROVED AND ADOPTED this
9th day of August, 2022.
____________________________
Malcolm Lilienthal, Mayor
ATTEST:
_____________________________
John Maier, City Clerk

Page 21 of 89 ends

14.C

Page 361 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Maier, City Clerk of the City of Hemet,
do hereby certify that the foregoing resolution was
adopted by the Hemet City Council on the 9th day of
August, 2022, and was passed by the following vote:

AYES: Council Members:

NOES: Council Member:

ABSTAIN: Council Member:

ABSENT: Council Member:
_________________________________
John Maier, City Clerk

Page 22 of 89 ends

14.C

Page 362 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

Page 23 of 89 ends

14.C

Page 363 of 2213 ends

A-1

EXHIBIT A

CITY OF HEMET
COMMUNITY FACILITIES DISTRICT NO. 2022-01
(TRES CERRITOS)

DESCRIPTION OF SERVICES
Authorized Services shall be the following:
▪ Street lights maintenance including
energy charges, operation, maintenance
and administrative costs of in-tract street
lights within the boundaries of the CFD
and off-site streetlights.
▪ Landscape maintenance to be financed,
including streetscape, fencing,
monuments and related facilities
specifically identified within the CFD. The
maintenance may include, but is not
limited to, all landscaping materials such
as turf, ground cover, shrub, trees, plants,
irrigation, fencing and drainage systems,
weed control, fuel modification, and other
abatements, lighting, electricity,
repair/replacement and inspection.

Inspection is inclusive of scheduling,
travel time, visual inspection process and
procedures, GPS location recording,
reporting by device, annual reporting,
visual inspection for functionality,
vegetated as designed, irrigation is
complete and in working order, noting any
of the following: any deficiencies, erosion,
trash, silt, sediment, structural
deficiencies. Maintenance is inclusive of
repair or replacing any of the items noted
as deficient or needing to be corrected to
not be deficient. Administration is
inclusive of quality assurance and control
of inspection and maintenance, general
contract administration, including phone
calls and procurement of goods and
services.

Page 24 of 89 ends

14.C

Page 364 of 2213 ends

A-1
▪ Park maintenance to be financed,
including maintenance of landscaping and
park facilities. Park facilities may include,
but is not limited to, play and exercise
structures, public gathering spaces and
shade structures, multi-purpose tables,
trash and recycling receptacles, barbeque
areas and related facilities specifically
identified within the CFD. The landscape
maintenance may include, but is not
limited to, all landscaping materials such
as turf, ground cover, shrub, trees, plants,
irrigation and drainage systems, weed
control and other abatements, electricity,
repair/replacement and inspection.
▪ Vernal Pool maintenance to be financed,
including annual inspection, annual
governmental reporting and annual
maintenance, including but not limited to
removal of debris, plant control/removal
and restoration as required.
▪ Maintenance, administration and
inspection of the stormwater facilities and
BMPs including water quality basins and
any other NPDES/WQMP/BMP related
devices. The maintenance may include,
but is not limited to, all landscaping
materials such as turf, ground cover,
shrub, trees, plants, irrigation, fencing and
drainage systems, weed control and other
abatements, lighting, electricity,
repair/replacement and inspection.

Inspection is inclusive of scheduling,
travel time, visual inspection process and
procedures, GPS location recording,
reporting by device, annual reporting,
visual inspection for functionality,
vegetated as designed, irrigation is
complete and in working order, noting any
of the following: any deficiencies, erosion,
trash, silt, sediment, structural
deficiencies. Maintenance is inclusive of
repair or replacing any of the items noted
as deficient or needing to be corrected to
not be deficient. Administration is

Page 25 of 89 ends

14.C

Page 365 of 2213 ends

A-1
inclusive of quality assurance and control
of inspection and maintenance, general
contract administration, including phone
calls and procurement of goods and
services.
▪ Litter and graffiti removal on soundwalls
and other amenities, plus normal painting
as required, within the CFD.
▪ All other related services necessary or
useful for, or in connection with, the
authorized services listed above, including
building a reserve fund for replacement.

Page 26 of 89 ends

14.C

Page 366 of 2213 ends

B-1

EXHIBIT B

CITY OF HEMET
COMMUNITY FACILITIES DISTRICT NO. 2022-01
(TRES CERRITOS)

RATE AND METHOD OF APPORTIONMENT
[please see attached]

Page 27 of 89 ends

14.C

Page 367 of 2213 ends

B-1

Page 28 of 89 ends

14.C

Page 368 of 2213 ends

Attach RATE AND METHOD OF APPORTIONMENT
OF SPECIAL TAX FOR here

Page 29 of 89 ends

14.C

Page 369 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

CITY OF HEMET
Hemet, California
RESOLUTION NO. 2022-XXX

A RESOLUTION OF THE

CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA,

CALLING A SPECIAL

ELECTION AND

SUBMITTING TO THE

QUALIFIED ELECTORS OF

CITY OF HEMET

COMMUNITY FACILITIES
DISTRICT NO. 2022-01
(TRES CERRITOS)

PROPOSITIONS

REGARDING THE

ESTABLISHMENT OF AN

APPROPRIATIONS LIMIT

AND THE ANNUAL LEVY OF

A SPECIAL TAX WITHIN THE

COMMUNITY FACILITIES

DISTRICT
WHEREAS, on August 9, 2022, the City
Council (the “City Council”) of the City of Hemet (the
“City”) held a public hearing (the “Public Hearing”) on the establishment of Community Facilities District No.
2022-01 (Tres Cerritos) (the “District”); and
WHEREAS, following the Public Hearing, the
City Council adopted a resolution entitled “Resolution
of Formation of the City Council of the City of Hemet,

Page 30 of 89 ends

14.C

Page 370 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
California, to Establish City of Hemet Community
Facilities District No. 2022-01 (Tres Cerritos), to
Establish an Appropriations Limit therefor, to
Authorize the Submittal of the Levy of Special Taxes,
and to Submit the Establishment of an Appropriations
Limit, to the Qualified Electors of such Community
Facilities District” (the “Resolution of Formation”)
ordering the formation of the District, and subject to
approval of the qualified electors of the District,
authorizing the levy of a special tax (the “Special
Tax”) on property within the District and establishing
an appropriations limit for the District, pursuant to the Mello-Roos Community Facilities Act of 1982, as
amended, commencing with Section 53311 of the
California Government Code (the “Act”); and
WHEREAS, pursuant to the Resolution of
Formation, the propositions relating to the levy of the Special Tax and the establishment of an
appropriations limit will be submitted to the qualified electors of the District as required by the Act; and
WHEREAS, no persons are registered to vote
in the territory of the District; and
WHEREAS, the City Clerk has advised the City
Council that she has received a Consent and Waiver

Page 31 of 89 ends

14.C

Page 371 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
from each and every landowner within the District,
pursuant to which each landowner has expressly
waived certain requirements related to the conduct of
the election;
NOW, THEREFORE, the City Council of the
City of Hemet does hereby find and resolve:

1. Recitals Correct. The foregoing
recitals are true and correct.
a. Call of Election. The City
Council hereby calls and
schedules a special
election for August 9,
2022, to consider the
proposition described in
Section 3 below.

2. Proposition.
a. Pursuant to
Sections 53325.7,
53326 and 53353.5 of
the Act, the proposition
relating to the levy of
the Special Tax and
the proposition relating
to the establishment of

Page 32 of 89 ends

14.C

Page 372 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
the appropriations limit
shall be combined into
one ballot proposition
and shall be submitted
to the qualified electors
of the District as
required by the Act.
b. If the combined
proposition for the levy
of the Special Tax and
the establishment of
the appropriations limit
receives the approval
of more than two-thirds
of the votes cast on the
proposition, the
Special Tax may be
levied and the
appropriations limit
may be established as
provided for in the
Resolution of
Formation.

Page 33 of 89 ends

14.C

Page 373 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
c. The amount,
method of collection
and purpose of the
Special Tax are
specified in the
Resolution of
Formation, on file in
the office of the City
Clerk and by this
reference incorporated
herein.
d. The proposition to
be submitted to the
voters of the District at
such special election
shall be as follows:
“Shall special taxes with a rate
and method of apportionment
as set forth in Exhibit “B” to the
resolution entitled “Resolution
of Formation of the City Council
of the City of Hemet, California,
to Establish City of Hemet

Page 34 of 89 ends

14.C

Page 374 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
Community Facilities District
No. 2022-01 (Tres Cerritos), to
Establish an Appropriations
Limit therefor, to Authorize the
Submittal of the Levy of Special
Taxes, and to Submit the
Establishment of an
Appropriations Limit, to the
Qualified Electors of such
Community Facilities District”
(the “Resolution of Formation”)
be levied annually on taxable
property within City of Hemet
Community Facilities District
No. 2022-01 (Tres Cerritos), to
pay for street lights,
landscaping, park maintenance,
vernal pool, stormwater and
water quality basin
maintenance services, and litter
and graffiti removal on sound
walls and other amenities, plus
normal painting, as required
within the District, all other

Page 35 of 89 ends

14.C

Page 375 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
related services necessary or
useful for, or in connection with,
the foregoing services,
including building a reserve
fund for replacement, and
incidental expenses thereto, all
as set forth in Exhibit “A” of the
Resolution of Formation, and
shall the appropriations limit be
established as set forth in
Section 14 of the Resolution of
Formation?”

3. Electors Determined. The City
Council finds that 12 persons
have not been registered to
vote within the territory of the
District for the 90 days
preceding the close of the
Public Hearing and that
pursuant to Section 53326 of
the Act, the vote in the special
election called by this
Resolution shall be by the
landowners of the District

Page 36 of 89 ends

14.C

Page 376 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
whose property would be
subject to the special taxes if
they were levied at the time of
the election, and each
landowner shall have one vote
for each acre, or portion
thereof, which he or she owns
within the District which would
be subject to the proposed
special taxes if they were
levied at the time of the
election.

4. Conduct of Election. Except as
otherwise provided in Section
6 hereof, the special election
shall be conducted by the City
Clerk in accordance with the
provisions of the California
Elections Code governing mail
ballot elections of cities, and in
particular the provisions of
Division 4 (commencing with
Section 4000), of that Code,

Page 37 of 89 ends

14.C

Page 377 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
insofar as they may be
applicable.

5. Election Procedures.
a. The procedures to
be followed in
conducting the special
election on the
proposition described
in Section 3 shall be as
provided in Section 12
of the Resolution of
Formation. It is hereby
acknowledged that the
City Clerk has on file a
copy of the Resolution
of Formation.
b. The City Council
hereby finds that the
qualified electors of the
District have waived
the time limits for
conducting the special
election by unanimous
written consent as

Page 38 of 89 ends

14.C

Page 378 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
provided in the
Consent & Waiver
signed by the land
owner.

6. Concurrence of the City Clerk.

The City Council hereby finds
and determines that the City
Clerk has concurred in the
shortened time for the
election, pursuant to Section
53326 of the Act,
PASSED, APPROVED AND ADOPTED this 9th
day of August, 2022.
__________________________
Malcolm Lilienthal, Mayor
ATTEST:
__________________________
John Maier, City Clerk

Page 39 of 89 ends

14.C

Page 379 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

CERTIFICATION
State of California )
County of Riverside )
City of Hemet )
I, John Maier, City Clerk of the City of Hemet,
do hereby certify that the foregoing resolution was
adopted by the Hemet City Council on the 9th day of
August, 2022, and was passed by the following vote:

AYES: Council Members:

NOES: Council Member:

ABSTAIN: Council Member:

ABSENT: Council Member:
_________________________________
John Maier, City Clerk

Page 40 of 89 ends

14.C

Page 380 of 2213 ends
Page 41 of 89 ends

14.C

Page 381 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx

CITY OF HEMET
Hemet, California
RESOLUTION NO. 2022-XXX

A RESOLUTION OF THE

CITY COUNCIL OF THE CITY

OF HEMET, CALIFORNIA,

DECLARING THE RESULTS

OF A SPECIAL ELECTION IN

CITY OF HEMET

COMMUNITY FACILITIES
DISTRICT NO. 2022-01
(TRES CERRITOS) AND

DIRECTING THE

RECORDING OF A NOTICE

OF SPECIAL TAX LIEN
WHEREAS, in proceedings heretofore
conducted by the City Council of the City of Hemet
(the “City Council”) pursuant to the Mello-Roos
Community Facilities Act of 1982, as amended,
commencing with Section 53311, of the California
Government Code (the “Act”), the City Council
adopted Resolution No. 2022-___ on August 9, 2022,
entitled “Resolution of the City Council of the City of Hemet, California, Calling a Special Election and
Submitting to the Qualified Electors of City of Hemet
Community Facilities District No. 2022-01 (Tres
Cerritos) Propositions Regarding the Establishment of
an Appropriations Limit and the Annual Levy of a

Page 42 of 89 ends

14.C

Page 382 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
Special Tax within the Community Facilities District”
(the “Resolution Calling Election”), calling for a special election (the “Special Election”) of the qualified
electors within Community Facilities District No. 2022- 01 (Tres Cerritos); and
WHEREAS, pursuant to the terms of the
Resolution Calling Election, which are by this
reference incorporated herein, the Special Election
was held on August 9, 2022, and the City Clerk has
on file a Certificate of the City Clerk as to the Results of the Canvass of the Election Returns (the
“Certificate”), a copy of which is attached hereto as
Exhibit A and by this reference incorporated herein;
and
WHEREAS, this City Council has reviewed said
Certificate and hereby approves it;
NOW, THEREFORE, the City Council of the
City of Hemet does hereby find and resolve:

1. Recitals Correct. The foregoing
recitals are true and correct.

2. Ballot Measure. The ballot
measure (the “Ballot Measure”)
presented to the qualified
electors is set forth in Exhibit B

Page 43 of 89 ends

14.C

Page 383 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
attached hereto and by this
reference incorporated herein.

3. Election Results. The results of
the Special Election are as set
forth in the Certificate on file with
the City Clerk and attached
hereto as Exhibit A. Pursuant to
the Certificate, the Ballot
Measure presented at the Special
Election was approved by the
qualified electors of the District.

4. Ballot Measure Authorized.

This City Council, acting in it
capacity as legislative body of the
District, is hereby authorized to
levy on the land within the District
the special tax described in the
Ballot Measure for the purposes
described therein and to take the
necessary steps to levy the
special tax authorized by the
Ballot Measure. The
appropriations limit as specified

Page 44 of 89 ends

14.C

Page 384 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
in the Ballot Measure is hereby
established.

5. Findings of Validity. It is hereby
found that all prior proceeding
and actions taken by this City
Council with respect to the
District were valid and in
conformity with the Act.

6. Notice of Special Tax Lien. The
City Clerk is hereby directed to
record in the office of the County
Recorder of the County of
Riverside within fifteen days of
the date hereof a notice of
special tax lien with respect to the
District in substantially the form
required by California Streets and
Highways Code Section 3114.5.

PASSED, APPROVED AND ADOPTED this
9th day of August, 2022.
____________________________
Malcolm Lilienthal, Mayor

Page 45 of 89 ends

14.C

Page 385 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
ATTEST:
_____________________________
John Maier, City Clerk

Page 46 of 89 ends

14.C

Page 386 of 2213 ends

CITY COUNCIL RESOLUTION NO. 2022-xxx
State of California )
County of Riverside )
City of Hemet )
I, John Maier, City Clerk of the City of Hemet,
do hereby certify that the foregoing resolution was
adopted by the Hemet City Council on the 9th day of
August, 2022, and was passed by the following vote:

AYES: Council Members:

NOES: Council Member:

ABSTAIN: Council Member:

ABSENT: Council Member:
_________________________________
John Maier, City Clerk

Page 47 of 89 ends

14.C

Page 387 of 2213 ends

A-1

EXHIBIT A

CITY OF HEMET
COMMUNITY FACILITIES DISTRICT NO. 2022-01
(TRES CERRITOS)

CERTIFICATE OF THE CITY CLERK AS TO THE

RESULTS OF THE CANVASS OF THE ELECTION

RETURNS
I, John Maier, City Clerk of the City of Hemet,
hereby certify that I canvassed the returns of the
Special Election in the City of Hemet Community
Facilities District No. 2022-01 (Tres Cerritos), and that the election was held in the Chambers of the City
Council at 450 E. Latham Avenue, Hemet, CA on
August 9, 2022.

I further certify that the total number of ballots
cast in said election and the total number of votes cast for and against the measure are full, true and correct:

Community Facilities District No. 2022-01
(Tres Cerritos) Special Tax Election,
August 9, 2022
Qualified
Eligible
Voters
Votes
Cast Yes No
Ballot Measure 1 116

IN WITNESS WHEREOF, I HAVE HEREUNTO
SET MY HAND this 9th day of August, 2022.

By:
______
______
______
______
__
John
Maier, City
Clerk
City of
Hemet

Page 48 of 89 ends

14.C

Page 388 of 2213 ends

A-1

Page 49 of 89 ends

14.C

Page 389 of 2213 ends

B-1

EXHIBIT B

BALLOT MEASURE

SPECIAL ELECTION

CITY OF HEMET
COMMUNITY FACILITIES DISTRICT NO. 2022-01
(TRES CERRITOS)
This ballot is for a special landowner election. You must return this ballot in the enclosed postage paid envelope to the office of the City Clerk of the City of Hemet no later than 4:00 p.m. on August 9, 2022, by mail; or in
person to the location of the public hearing no later than 7:00 p.m. on August 9, 2022. The City Clerk’s office is located at 445 E Florida Avenue, Hemet, CA 92543.

The public hearing will be held at the City Council
Chambers, 450 E. Latham Ave., Hemet, CA, 92543.

This ballot is provided to Forestar USA Real Estate
Group, Inc., a Texas Corporation, (the “Owner”) or
authorized representative of such Owner of land with
Community Facilities District No. 2022-01 (Tres
Cerritos) of the City of Hemet and represents one
hundred sixteen (116) votes on assessor parcel
numbers:
448-070-002 448-070-011
448-070-005 448-080-001
448-070-007 448-080-002
448-070-009 448-080-004
448-070-010 448-080-006
To vote, mark a cross (X) in the voting square after
the word “YES” or after the word “NO”. All marks
otherwise made are forbidden and make the ballot
void.

If you wrongly mark, tear, or deface this ballot, return it to the City Clerk of the City of Hemet to obtain a
replacement ballot.

Page 50 of 89 ends

14.C

Page 390 of 2213 ends

B-1

Page 51 of 89 ends

14.C

Page 391 of 2213 ends

B-3
MEASURE: “Shall special taxes with a rate
and method of apportionment as set forth in
Exhibit “B” to the resolution entitled “Resolution
of Formation of the City Council of the City of
Hemet, California, to Establish City of Hemet
Community Facilities District No. 2022-01 (Tres
Cerritos), to Establish an Appropriations Limit
therefor, to Authorize the Submittal of the Levy
of Special Taxes, and to Submit the
Establishment of an Appropriations Limit, to the
Qualified Electors of such Community Facilities
District” (the “Resolution of Formation”) be
levied annually on taxable property within City
of Hemet Community Facilities District No.
2022-01 (Tres Cerritos), to pay for street lights,
landscaping, park maintenance, vernal pool,
stormwater and water quality basin
maintenance services, and litter and graffiti
removal on sound walls and other amenities,
plus normal painting, as required within the
District, all other related services necessary or
useful for, or in connection with, the foregoing
services, including building a reserve fund for
replacement, and incidental expenses thereto,
all as set forth in Exhibit “A” to the Resolution of
Formation, and shall the appropriations limit be
established as set forth in Section 14 of the
Resolution of Formation?”
Yes
No
Property Owner/Authorized Representative Signature:
____________________________________________
Daniel C. Bartok, Authorized Signatory

Page 52 of 89 ends

14.C

Page 392 of 2213 ends

B-3

Page 53 of 89 ends

14.C

Page 393 of 2213 ends

B-3

Page 54 of 89 ends

14.C

Page 394 of 2213 ends
Page 55 of 89 ends

14.C

Page 395 of 2213 ends

CFD Report
City of Hemet
Community Facilities District 2022-01 (Tres
Cerritos)
July 2022
Prepared for:

City of Hemet
445 E Florida Avenue
Hemet, CA 92543
Prepared by:
41593 Winchester Rd, Suite 200
Temecula, California 92590
(949) 655-3900

Page 56 of 89 ends

14.C

Page 396 of 2213 ends

1 TABLE OF CONTENTS
COMMUNITY FACILITIES DISTRICT 2022-01 (Tres Cerritos)
Section A – Introduction Page 2
Section B – Description of Services Page 2
Section C – Cost Estimate Page 5
Section D – Rate and Method of Apportionment of Special Tax Page 7 Section E – Proposed Boundaries Page 9

APPENDIX
Rate and Method of Apportionment A
Boundary Map B

Page 57 of 89 ends

14.C

Page 397 of 2213 ends

2 Agency: City of Hemet
Project: City of Hemet
Community Facilities District No. 2022-01 (Tres Cerritos) County of Riverside, State of California
Community Facilities District Report
“Mello-Roos Community Facilities Act of 1982”
A. Introduction
Whereas, the City Council of the City of Hemet, County of Riverside, State Of California (Council), did, pursuant to the provisions of the Mello-Roos Community Facilities Act of 1982, as amended, being Chapter 2.5 of Division 2 of Title 5 of the California Government Code (Act), on July 12, 2022, adopt Resolution No. 2022-133 and on ______________, adopt Resolution 2022- ___ (Resolutions) expressly ordering the preparation and filing of a written Report for a proposed Community Facilities District (Report). This Community Facilities District shall be referred to as City of Hemet Community Facilities District No. 2022-01 (Tres Cerritos) (CFD) and (CFD No. 2022-01 (Tres Cerritos)); and,
Whereas, The Resolution ordering said Report, did direct that the Report generally contain the following:
 A brief description of the services by type proposed to be financed by the CFD which will adequately meet the needs of the CFD; and
 An estimate of the costs of providing such services, including the incidental expenses, to be incurred in connection with the CFD;
Now, Therefore, the undersigned, authorized representative of Harris & Associates, the appointed Special Tax Consultant and responsible officer or person directed to prepare the Report, pursuant to the provisions of the Act, does hereby submit the following data.

B. Description of Services
A Community Facilities District may provide for financing of certain public services which are necessary to meet increased demands placed upon local agencies as a result of development or rehabilitation occurring with the CFD.

Page 58 of 89 ends

14.C

Page 398 of 2213 ends

3 A general description of the proposed services, pursuant to the terms stated in Exhibit “A” of the Resolution, is as follows:

Street Lights
 Street lights maintenance including energy charges, operation, maintenance and administrative costs of in-tract street lights within the boundaries of the CFD and off-site street lights.

Landscaping
 Landscape maintenance to be financed, including streetscape, fencing, monuments and related facilities specifically identified within the CFD. The maintenance may include, but is not limited to, all landscaping materials such as turf, ground cover, shrub, trees, plants, irrigation, fencing and drainage systems, weed control, fuel modification, and other abatements, lighting, electricity, repair/replacement and inspection. Inspection is inclusive of scheduling, travel time, visual inspection process and procedures, GPS location recording, reporting by device, annual reporting, visual inspection for functionality, vegetated as designed, irrigation is complete and in working order, noting any of the following: any deficiencies, erosion, trash, silt, sediment, structural deficiencies. Maintenance is inclusive of repair or replacing any of the items noted as deficient or needing to be corrected to not be deficient. Administration is inclusive of quality assurance and control of inspection and maintenance, general contract administration, including phone calls and procurement of goods and services.

Parks
 Park maintenance to be financed, including maintenance of landscaping and park facilities.

Park facilities may include, but is not limited to, play and exercise structures, public gathering spaces and shade structures, multi-purpose tables, trash and recycling receptacles, barbeque areas and related facilities specifically identified within the CFD.

The landscape maintenance may include, but is not limited to, all landscaping materials such as turf, ground cover, shrub, trees, plants, irrigation and drainage systems, weed control and other abatements, electricity, repair/replacement and inspection.

Vernal Pool Maintenance
 Vernal Pool maintenance to be financed, including annual inspection, annual governmental reporting and annual maintenance, including but not limited to removal of debris, plant control/removal and restoration as required.

Stormwater Facilities
 Maintenance, administration and inspection of the stormwater facilities and BMPs including water quality basins and any other NPDES/WQMP/BMP related devices. The maintenance may include, but is not limited to, all landscaping materials such as turf,

Page 59 of 89 ends

14.C

Page 399 of 2213 ends

4 ground cover, shrub, trees, plants, irrigation, fencing and drainage systems, weed control and other abatements, lighting, electricity, repair/replacement and inspection. Inspection is inclusive of scheduling, travel time, visual inspection process and procedures, GPS location recording, reporting by device, annual reporting, visual inspection for functionality, vegetated as designed, irrigation is complete and in working order, noting any of the following: any deficiencies, erosion, trash, silt, sediment, structural deficiencies.

Maintenance is inclusive of repair or replacing any of the items noted as deficient or needing to be corrected to not be deficient. Administration is inclusive of quality assurance and control of inspection and maintenance, general contract administration, including phone calls and procurement of goods and services.

Graffiti Abatement
 Litter and graffiti removal on soundwalls and other amenities, plus normal painting as required, within the CFD.

Incidentals
 All other related services necessary or useful for, or in connection with, the authorized services listed above, including building a reserve fund for replacement.

The services listed herein are representative of the types of services authorized to be financed by Community Facilities District No. 2022-01 (Tres Cerritos). Detailed scope and limits of specific projects will be determined as appropriate, consistent with the standards of the City of Hemet.

Addition, deletion or modification of descriptions of the services may be made consistent with the requirements of the City Council of the City of Hemet, the Community Facilities District No. 2022-01 (Tres Cerritos), and the Act.

Based upon the above, it is my opinion that the services being funded are those that are necessary to meet certain increased demands placed upon the City of Hemet, as a result of development occurring within the boundaries of the CFD.

Dated this 9th of August 2022.

Harris & Associates
___________________________
Special Tax Consultant
CFD 2022-01 (Tres Cerritos)
City of Hemet
County of Riverside
State of California

Page 60 of 89 ends

14.C

Page 400 of 2213 ends

5 C. Cost Estimate

1. The cost estimate, including incidental expenses, is approximately $56,388.34 annually for Special Tax A and $97,122.52 for Special Tax B. The Maximum Special Taxes within the CFD have been established to pay for these services up to $320.00 for Special Tax A and $552.00 for Special Tax B, per taxable unit per year for Single Family Residential Property, $224.00 for Special Tax A and $386.00 for Special Tax B, per taxable unit per year for Condominium Residential Property and $1,680.00 for Special Tax A and $2,894.00 for Special Tax B, per acre per year for Multifamily Residential, Non-Residential Property and Undeveloped (as defined in the Rate and Method of Apportionment attached in Appendix A). These amounts shall be increased annually based upon the percentage change in the Consumer Price Index, with a maximum annual increase of six percent (6%) and a minimum increase of two percent (2%) of the Maximum Special Tax in effect in the previous Fiscal Year, in accordance with the Rate and Method of Apportionment.

2. Pursuant to Section 53340 of the Act, the proceeds of any special tax levied and collected by CFD No. 2022-01 (Tres Cerritos) may be used only to pay for the cost of providing services and incidental expenses. As defined by the Act, incidental expenses include, but are not limited to, the annual costs associated with determination of the amount of special taxes, collection of special taxes, payment of special taxes, or costs otherwise incurred in order to carry out the authorized purposes of the community facilities district. The incidental expenses associated with the annual administration of CFD No. 2022-01 (Tres Cerritos) are initially estimated to be $10,000. This amount shall be increased based upon the percentage change in the Consumer Price Index, with a maximum annual increase of six percent (6%) and a minimum increase of two percent (2%) of the Maximum Special Tax in effect in the previous Fiscal Year, in accordance with the Rate and Method of Apportionment.

3. The cost of the services shall include incidental expenses, including costs associated with formation of the CFD, determination of the amount of the special tax, collection of the special tax, payment of the special tax, costs incurred in order to carry out the authorized purposes of the CFD, and the costs of engineering, inspecting, coordinating, completing, planning and designing the services, including the costs of environmental evaluations.

The following incidental expenses are examples of those that may be incurred in the formation of the CFD:
 Engineering services,
 Publishing, mailing and posting of notices,
 Governmental notification and filing costs,
 Election costs, and
 Charges and fees of the City of Hemet other than those waived.

The following incidental expenses are examples of those that may be incurred in each annual special tax levy:

Page 61 of 89 ends

14.C

Page 401 of 2213 ends

6  Necessary consultant costs,
 Costs of posting and collecting the special taxes, and  Administrative costs of the City of Hemet related to each annual special tax levy.

Dated this 9th of August 2022.

Harris & Associates
___________________________
Special Tax Consultant
CFD 2022-01 (Tres Cerritos)
City of Hemet
County of Riverside
State of California

Page 62 of 89 ends

14.C

Page 402 of 2213 ends

7 D. Rate and Method of Apportionment of Special Tax

1. The Rate and Method of Apportionment of the special tax is attached hereto as Appendix A (Rate and Method). The special tax will be collected in the same manner and at the same time as ad valorem property taxes and subject to the same penalties and provisions; however, the special tax may be collected at a different time or in a different manner if necessary, for CFD No. 2022-01 (Tres Cerritos) to meet its financial obligations as permitted by the Act.

2. Maintenance of the Special Tax B Improvements shall be the responsibility of the Property Owner’s Association as long as the Special Tax B Improvements are being maintained to a standard acceptable to the City. Special Tax B shall not be levied in any year the City determines that the Special Tax B Improvements have been maintained to a standard acceptable to the City. Special Tax B shall begin to be levied in the first year in which the City determines that the Special Tax B Improvements, have not been maintained to a standard acceptable to the City of Hemet. The City shall not levy Special Tax B without first giving notice to the Property Owner’s Association specifying the maintenance deficiency related to the Special Tax B Improvements and allowing a sufficient period for curing such deficiency.

2. All the property located within CFD No. 2022-01 (Tres Cerritos), unless exempt by law or by the Rate and Method of Apportionment of the special tax proposed for CFD No. 2022- 01 (Tres Cerritos), shall be taxed for the purpose of providing necessary services to the CFD. Pursuant to Section 53325.3 of the Act, the tax imposed “is a special tax and not a special assessment, and there is no requirement that the tax be apportioned on the basis of benefit to any property”. The special tax may be based on benefit received by property, the cost of maintaining facilities or authorized services available or other reasonable basis as determined by the Council, although the special tax may not be apportioned on an ad valorem basis pursuant to Article XIII A of the California Constitution.

3. In order to establish the special tax for the CFD, Harris & Associates has relied upon information including, but not limited to: building square footage, net taxable acreage, land use type, types of services, square footage of service areas, street light parameters, groundcover, shrubs, trees, and plant material expected to be included within the CFD, and estimated costs to maintain which were provided to Harris & Associates by developers, City of Hemet, County of Riverside, and others. Harris & Associates has not independently verified such data and disclaims responsibility for the impact of inaccurate data provided by others, if any, on the Rate and Method of Apportionment for CFD No. 2022-01 (Tres Cerritos), including the inability to meet the financial obligations of the CFD.

Page 63 of 89 ends
← All documents from this meeting