April 2026 Page 21

4. CEQA Thresholds

NOISE THRESHOLDS
According to Appendix G of the CEQA Guidelines, a project would normally have a significant effect on the environment if the project would result in:

N-1 Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies.

N-2 Generation of excessive groundborne vibration or groundborne noise levels.

N-3 For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, if the project would expose people residing or working in the project area to excessive noise levels.

SIGNIFICANCE THRESHOLDS

4.2.1 Traffic Noise
As mentioned above under the General Plan Noise Element, Implementation 10, a significant traffic noise impact would occur if the proposed project would result in a noise increase at noise sensitive land uses of:
 1.5 dBA or more where the existing noise level is above 65 dBA CNEL.  3 dBA or more where the existing noise level is between 60 to 65 dBA CNEL.  5 dBA or more where the existing noise level is less than 60 dBA CNEL.

4.2.2 Construction Noise
Section 9.22.050 of the Bakersfield Municipal Code prohibits construction activities from 9:00 p.m. to 6:00 a.m. Monday through Friday (including federal holidays), and before 8:00 a.m. or after 9:00 p.m. on weekends.

The City of San Bakersfield does not have an established noise threshold for construction noise. The FTA provides criteria for acceptable construction noise levels and recommends a daytime noise threshold of 80 dBA Leq for residential uses, 85 dBA Leq for commercial uses, and 90 dBA Leq for industrial uses. For the purposes of this analysis, the FTA criterion is used for nearby receptors.

4.2.3 Stationary Noise
As discussed above in Section 2, Regulatory Setting, the City’s General Plan Noise Element establishes exterior noise levels based on receiving land use. Residential areas shall not exceed an exterior daytime noise level of 75 dBA Lmax or 55 dBA L50 and an exterior nighttime noise level of 70 dBA Lmax or 50 dBA L50. For the purposes of this analysis, these exterior noise standards (summarized in Table 5 above) are used to determine impact significance at nearby sensitive receptors.

4.1 4.2

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

4. CEQA Thresholds

Page 22 ends

4.2.4 Vibration
The City of Bakersfield does not have specific thresholds for vibration-induced architectural damage related to construction activities. The FTA provides criteria for acceptable levels of ground-borne vibration for various types of buildings. Therefore, to determine impact significance, the FTA criteria were used for this analysis.

These criteria are shown in Table 8, Groundborne Vibration Criteria: Architectural Damage. For purposes of this analysis, the threshold of 0.2 PPV (in/sec) will be used to determine impact significance for building vibration damage to residential uses and 0.3 PPV (in/sec) will be used for commercial buildings.

Table 8 Groundborne Vibration Criteria: Architectural Damage Building Category PPV (in/sec)
I. Reinforced concrete, steel, or timber (no plaster) 0.5 II. Engineered concrete and masonry (no plaster) 0.3
III. Nonengineered timber and masonry buildings 0.2
IV. Buildings extremely susceptible to vibration damage 0.12 Source: FTA 2018.

Note: PPV = peak particle velocity
The City of Bakersfield does not have specific thresholds for vibration-induced annoyance related to construction activities. The FTA provides criteria for acceptable levels of ground-borne annoyance. Therefore, to determine impact significance, the FTA criteria were used for this analysis. These criteria are shown in Table 9, Groundborne Annoyance Criteria. According to FTA’s Transit Noise and Vibration Impact Assessment Manual, a vibration velocity (VdB) of 75 to 85 VdB will annoy individuals. For purposes of this analysis, the threshold of 75 VdB was used to determine impact significance for human vibration annoyance for residential uses and 85 VdB was used for commercial uses.

Table 9 Groundborne Annoyance Criteria
Vibration Velocity
Level
Nosie Level
Low Frequency Mid Frequency Human Response
65 VdB 25 dBA 40 dBA
Approximate threshold of perception for many humans. Low-frequency sound: usually inaudible. Mid-frequency sound:
excessive for quiet sleeping areas.
75 VdB 35 dBA 50 dBA
Approximate dividing line between barely perceptible and distinctly perceptible. Many people find transit vibration at this level annoying. Low-frequency noise: tolerable for sleeping areas. Mid-frequency noise: excessive in most quiet occupied areas. 85 VdB 45 dBA 60 dBA
Vibration tolerable only if there are an infrequent number of events per day. Low-frequency noise: excessive for sleeping areas.

Midfrequency noise: excessive even for infrequent events for some activities.

Source: FTA 2018, Table 5-5.

Notes: Low Frequency= Approximate noise level when vibration spectrum peak is near 30 hertz (Hz).

Mid Frequency= Approximate noise level when vibration spectrum peak is near 60 Hz.

April 2026 Page 23

5. Environmental Impacts

METHODOLOGY
The analysis of construction noise from future development projects anticipated under the City’s General Plan utilizes the FHWA Roadway Construction Noise Model (RCNM). The model is based on a representative equipment mix for standard construction activities. Given the variable nature of construction, the worst-case scenario is modeled by combining the Leq contributions from the simultaneous operation of the three loudest pieces of equipment for a given activity. Construction noise levels are modeled from the acoustical center of a hypothetical construction area of each phase to the property line of the nearest noise-sensitive receptor.

Future traffic noise levels were calculated for roadway segments forecasted to experience the most substantial increases in traffic volume. Transportation noise levels were modeled using the Federal Highway Administration (FHWA) Traffic Noise Prediction Model, incorporating the provided traffic volumes, posted speeds, vehicle type percentages, number of lanes, and intervening site conditions. Average daily traffic (ADT) segment volumes provided by Integrated Engineering Group (IEG) for existing and project buildout are used to estimate traffic noise increases.

Groundborne vibration and noise from construction is determined using FTA methodology and reference vibration levels for typical equipment (FTA, 2018). Vibration levels are modeled from the nearest disturbance area of the construction site to the foundation or building façade of the nearest sensitive receptor.

IMPACTS ANALYSIS
This section discusses the project-specific impacts related to noise and vibration.

NOISE-1 The proposed project’s construction activities would result in temporary noise increases in the vicinity of the project site that would not exceed applicable standards. [Threshold N-1] Two types of short-term noise impacts could occur during construction: (1) mobile-source noise from transport of workers, material deliveries, and debris and soil haul and (2) stationary-source noise from use of construction equipment. Existing uses surrounding the project site would be exposed to construction noise.

Construction is anticipated to be completed in two development phases over approximately 22 months, estimated to begin in 2026.

Construction Vehicles
The transport of workers and materials to and from the construction site would incrementally increase noise levels along Rosedale Highway. Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Based on data provided by the applicant, the proposed project would generate up

5.1 5.2

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts

Page 24 ends

to 264 combined temporary worker and vendor daily trips during the overlapping building construction and site preparation phases. A maximum of 140 daily haul truck tips is estimated during off-site improvements.

Existing trips along Rosedale Highway are over 20,000 ADT (see Table 10, below). The addition of these construction trips would be temporary and not substantially increase ambient noise levels. When compared to the thousands of existing daily trips along Rosedale Highway and Coffee Road, the traffic noise increase would be less than 0.1 dBA CNEL. Therefore, the proposed project would have a less than significant impact.

Construction Equipment
Noise generated by on-site construction equipment is based on the type of equipment used, its location relative to sensitive receptors, and the timing and duration of noise-generating activities. Each phase of construction involves different types of equipment and has distinct noise characteristics. Noise levels from construction activities are typically dominated by the loudest pieces of equipment. The dominant equipment noise source is typically the engine, although work-piece noise (such as dropping of materials) can also be noticeable.

As shown in Table 1, the proposed project would be constructed in two phases. Each phase has its own set of construction activities; however, they all have similar equipment mixes in each activity (e.g., site preparation, demolition, and paving). This construction noise analysis modeled the worst-case phase in terms of number of equipment, equipment noise levels, and proximity to off-site sensitive receptors. The noise produced by each activity is determined by combining the Leq contributions from the top three loudest pieces of equipment used at a given time while accounting for the ongoing time variations of engine under load (commonly referred to as the usage factor). Heavy equipment, such as a dozer or a loader, can have maximum, short-duration noise levels of up to 85 dBA at 50 feet. However, overall noise emissions vary considerably, depending on the specific activity at any given moment.

Noise attenuation due to distance, the number and type of equipment, and the load and power requirements to accomplish tasks at each construction phase would result in different noise levels at a given receptor. Since noise from construction equipment is intermittent and diminishes at a rate of at least 6 dBA per doubling of distance (conservatively ignoring other attenuation effects from air absorption, ground effects, and shielding effects), the average noise levels at noise-sensitive receptors could vary considerably as mobile construction equipment moves around the site (site of each development phase) with different loads and power requirements. The City of Bakersfield does not have an established construction noise threshold. Therefore, the FTA criterion of 80 dBA Leq is used to determine impact significance at off-site sensitive receptors and 85 dBA Leq is used for off-site non-noise sensitive receptors.

Construction noise levels associated with the proposed project were modeled using RCNM from the acoustical center of the construction activity area to the nearest sensitive receptors. Equipment for grading and site preparation is modeled at spatially averaged distances (i.e., from the acoustical center of the general construction site to the property line of the nearest receptors) because the area around the center of construction activities best represents the potential average construction-related noise levels at the various sensitive receptors for mobile equipment. Building construction and architectural coating are measured from the edge of the proposed buildings to the nearest sensitive receptors. Additionally, paving is measured from the nearest paving areas to the nearest sensitive receptors. Construction noise modeling does not account for existing masonry walls at nearby residential property lines (e.g., single-family residential uses to the southwest

RIVERVIEW MARKE PLACE T NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 25
along El Toro Viejo Road), which could provide up to 6 dBA reduction based on existing wall heights. Results are summarized in Table 10, Phase 1 Project-Related Construction Noise, dBA Leq, Table 11, Phase 2 Project-Related Construction Noise, dBA Leq.

As demonstrated in Tables 10 and 11, construction noise levels due to development of Phase 1 and Phase 2 of the proposed project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, project related construction noise impacts would be less than significant.

Table 10 Phase 1 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM
Reference
Noise Level
Nearest Off-Site Receptors
Commercial
Receptor to North
Commercial
Receptor to East
Residential Receptor
to South
Commercial
Receptor to West
Distance in feet: 50 300 580 275 225
Site Prep 84 68 62 69 71
Rough Grading 84 69 63 70 71
Fine Grading 83 67 61 68 70
Distance in feet: 50 215 415 380 70
Building Construction 75 62 56 57 72
Architectural Coating 77 64 58 59 74
Distance in feet: 50 180 395 130 55
Paving 79 68 61 71 78
Distance in feet: 50 200 415 185 65
Utilities Trenching 81 69 62 69 78
Maximum dBA Leq 69 63 71 78
Exceeds FTA Threshold? 1 No No No No
Notes: Calculations with the FHWA RCNM software are in Appendix A. 1FTA Thresholds: 80 dBA residential, 85 dBA commercial Table 11 Phase 2 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM Reference
Noise Level
Nearest Off-Site Receptors
Commercial Receptor to
North
Commercial Receptor to
East
Residential Receptor to
West
Distance in feet: 50 1,350 585 1,950
Site Prep 84 55 62 52
Rough Grading 84 56 63 53
Fine Grading 83 54 61 51
Distance in feet: 50 1,200 505 1,825
Building Construction 75 47 54 43
Architectural Coating 77 49 57 45
Distance in feet: 50 1,150 465 1,770
Paving 79 52 60 48

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts

Page 26 ends

Table 11 Phase 2 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM Reference
Noise Level
Nearest Off-Site Receptors
Commercial Receptor to
North
Commercial Receptor to
East
Residential Receptor to
West
Distance in feet: 50 1,175 435 1,795
Utilities Trenching 81 53 62 50
Maximum dBA Leq 56 63 53
Exceeds FTA Threshold? 1 No No No
Notes: Calculations with the FHWA RCNM software are in Appendix A. 1FTA Thresholds: 80 dBA residential, 85 dBA commercial Construction Noise from Off-Site Roadway Improvements
As a part of the project, various roadway improvement would be implemented along Rosedale Highway and Coffee Road, as discussed in detail in Section 1.2, Project Description. These off-site improvements would require construction equipment, including but not limited to water trucks, loaders, pavers, rollers, air compressors, tractors, scrapers, and graders. Construction activities from roadway improvements would not expose surrounding sensitive receptors to prolonged periods of construction noise. Though some equipment could reach up to 85 dBA Leq at a distance of 50 feet, construction for the off-site improvements would progress in a linear fashion, generating less noise at each receptor each day. The nearest off-site sensitive receptor is approximately 700 feet south of the proposed roadway improvements and noise levels would be up to 62 dBA Leq. Additionally, off-site roadway improvements would be temporary and anticipated to last a limited period—22 work days—and would not occur during nighttime hours. Construction noise levels due to off-site roadway improvements of the proposed project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, project related off-site roadway improvements construction noise impacts would be less than significant.

NOISE-2 Project implementation would result in long-term, operation-related noise that would not exceed local standards. [Threshold N-1]
Mobile-Source Noise Impacts
A project will normally have a significant effect on the environment related to noise if it substantially increases the ambient noise levels at adjoining areas. Most people can detect changes in sound levels of approximately 3 dBA under normal, quiet conditions, and changes of 1 to 3 dBA under quiet, controlled conditions. Changes of less than 1 dBA are usually indiscernible. A change of 5 dBA is readily discernible to most people in an exterior environment. Noise levels above 65 dBA CNEL are normally unacceptable at sensitive receptor locations such as residences, schools, and noise environments in these areas would be considered degraded.

Based on this, a significant impact would occur if the following traffic noise increases occur relative to the existing noise environment or exceed 65 dBA CNEL.

The proposed project traffic analysis included 26 study roadway segments in the project vicinity. Table 12, Project and Cumulative Traffic Noise Increase, shows that the estimated project and cumulative traffic noise increase over existing conditions at the 26 study roadway segments would be up to 0.4 dBA CNEL. As shown in the table,

RIVERVIEW MARKE PLACE T NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 27
the proposed project would not exceed the 1.5 dBA minimum threshold. In addition, the estimated cumulative related traffic noise increase would be less than 1 dBA CNEL and the contribution from the proposed project would also be less 1 dBA CNEL. As shown in Table 12, the proposed project would comply with General Plan Noise Element Implementation 10. Therefore, project related traffic noise impacts would be less than significant.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts

Page 28 ends

This page intentionally left blank.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 29
Table 12 Project and Cumulative Traffic Noise Increase
Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 73.9 74.2 0.2 73.9 74.2 0.2 73.9 74.2 0.3 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way

75.1 75.4 0.3 75.1 75.4 0.3 75.1 75.5 0.4
Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade

75.3 75.7 0.4 75.3 75.7 0.4 75.3 75.7 0.5
Rosedale Highway (CA-58) Northwest Promenade to Coffee
Road

75.4 75.6 0.2 75.4 75.6 0.2 75.4 75.6 0.3
Rosedale Highway (CA-58) Coffee Road to Patton Way 74.9 75.0 0.1 74.9 75.0 0.1 74.9 75.0 0.1 Coffee Road Olive Drive to Hageman Road 75.0 75.2 0.2 75.1 75.2 0.1 75.7 75.9 0.2 Coffee Road Hageman Road to Meany
Avenue/Riverlakes Drive

75.8 76.0 0.2 75.8 76.0 0.1 76.5 76.7 0.2
Coffee Road Riverlakes Drive/Meany Avenue to
Downing Avenue

76.7 76.9 0.2 76.7 76.9 0.2 77.4 77.6 0.2
Coffee Road Downing Avenue to Granite Falls
Drive

76.9 77.1 0.2 77.0 77.1 0.2 77.6 77.9 0.2
Coffee Road Granite Falls Drive to Rosedale
Highway (CA-58)

76.7 76.9 0.2 76.7 76.9 0.2 77.3 77.6 0.3
Coffee Road Rosedale Highway (CA-58) to Jet
Way

77.4 77.6 0.2 77.4 77.6 0.2 78.0 78.3 0.2
Coffee Road Jet Way to Brimhall Road 77.5 77.9 0.5 77.5 77.9 0.4 78.1 78.6 0.5 Coffee Road Brimhall Road to Westside Parkway
EB Ramps

78.3 78.4 0.2 78.3 78.4 0.1 78.9 79.0 0.2
Coffee Road Westside Parkway EB Ramps to
Truxtun Road

77.5 77.7 0.2 77.5 77.7 0.2 78.1 78.3 0.2
Coffee Road Truxtun Road and Stockdale
Highway

78.2 78.4 0.1 78.2 78.4 0.1 78.3 78.5 0.2
Calloway Drive Noriega Road to Hageman Road 75.4 75.4 0.1 75.4 75.4 0.0 75.9 75.9 0.1 Calloway Drive Hageman Road to Meacham Road 75.5 75.6 0.1 75.6 75.6 0.1 75.6 75.7 0.1

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts

Page 30 ends

Table 12 Project and Cumulative Traffic Noise Increase
Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Calloway Drive Meacham Road to Rosedale
Highway (CA-58)

75.8 75.9 0.1 75.8 75.9 0.1 75.9 76.0 0.1
Calloway Drive Rosedale Highway (CA-58) to
Brimhall Road

76.7 76.8 0.1 76.7 76.8 0.1 77.0 77.1 0.1
Brimhall Road Allen Road to Old Farm Road 69.3 69.5 0.2 69.3 69.5 0.2 69.7 69.9 0.2 Brimhall Road Old Farm Road to Jewetta Avenue 70.1 70.4 0.3 70.1 70.4 0.2 70.6 70.8 0.3 Brimhall Road Jewetta Avenue to Verdugo Lane 70.8 71.2 0.4 70.9 71.2 0.3 71.3 71.7 0.4 Brimhall Road Verdugo Lane to Calloway Drive 71.6 71.9 0.3 71.6 71.9 0.3 72.0 72.4 0.4 Brimhall Road Calloway Drive to Harvest Creek
Road

71.9 72.3 0.4 71.9 72.3 0.4 72.4 72.8 0.5
Brimhall Road Harvest Creek Road to Coffee Road 72.3 72.8 0.4 72.4 72.8 0.4 73.0 73.4 0.4 Hageman Road Calloway Drive to Coffee Road 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Source: Project traffic provided by IEG (2025).

See Appendix A for modeling inputs and results.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 31
Stationary-Source Noise Impacts
Car Wash
The proposed project includes the development of a car wash near the northwestern end of the project site (see Figure 2). The car wash would generate noise at the nearby receptors primarily due to vacuums and the tunnel dryers. Dryer and vacuum noise levels decrease by approximately 6 dBA for each doubling of distance from the source (not including ground attenuation effects and shielding factors). The analysis below uses the City’s 75 dBA Lmax or 55 dBA L50 daytime and 70 dBA Lmax or 50 dBA L50 nighttime exterior noise standards to determine impact significance at nearby sensitive receptors. It should be noted that Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period.

Vacuum Noise
Noise measurements from a car wash study with similar layout, equipment, and capacity were conducted by PlaceWorks staff. Based on these measurements, noise from unholstered, in-use vacuums was 64 dBA at a distance of 40 feet. Typically, the average person uses a vacuum for 5 minutes, and 60 percent of the vacuums are conservatively assumed to operate at once, which would be 13 vacuums. The simultaneous use of 13 vacuums would equal approximately 75 dBA at 40 feet. The nearest residential receptor to the proposed vacuum stalls is approximately 780 feet southwest and the nearest commercial receptor is approximately 345 feet to the north. Vacuum stall noise levels at the nearest residential receptor would be approximately 49 dBA, and approximately 56 dBA at nearest commercial use to the north, without accounting for shielding provided by the proposed storage building and proposed Pad 2 building. Conservatively assuming a 3 dBA reduction to account for shielding that would be provided by the current site plan showing an on-site storage building and 8 dBA reduction to account for shielding that would be provided by the Pad 2 building, vacuum stall noise levels would be approximately 45 dBA at the nearest residential receptor and 48 dBA at the nearest commercial receptor.

Tunnel Dryer
Tunnel dryers are typically placed one to two feet within the car wash exit structure. Dryer noise levels are approximately 80 dBA at 30 feet, based on previous PlaceWorks car wash measurements. The nearest residential receptor to the tunnel dryer is approximately 780 feet southwest and the nearest commercial receptor is approximately 265 feet to the north. Tunnel dryer noise levels at the nearest residential receptor would be approximately 52 dBA, and approximately 61 dBA at nearest commercial use to the north, without accounting for shielding provided by the proposed storage building. Conservatively assuming a 5 dBA reduction to account for shielding that would be provided by the on-site storage building, tunnel dryer noise levels would be approximately 47 dBA at the nearest residential receptor.

Table 13 shows approximate car wash noise levels at the nearest sensitive receptors with operation of the project. These calculations conservatively take into account shielding from proposed on-site buildings. Ambient noise monitoring indicates that existing ambient noise levels currently exceed the daytime noise standard.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY O F BAK ERSFIELD

5. Environmental Impacts

Page 32 ends

Table 13 Attenuated Noise Levels at Sensitive Receptors, dBA Lmax Reference Noise Source Reference Noise Level Commercial to North1, 2 Residential to South1 Distance in feet 40 345 770
Vacuum on (unholstered) 64 48 45
Distance in feet 30 265 780
Tunnel dryers 80 61 47
Cumulative Noise Level 61 49
Measured L50 (Existing Ambient)3 73.9 57.6
Measured Lmax (Existing Ambient)3 101.8 83.5
Note: dBA = A-weighted Sound Pressure Level.

Noise levels rounded up or down to the nearest whole number. 1 Distance measured from the center of vacuum stalls and tunnel dryers to nearest receptor (based on site plans provided by applicant). 2 Accounts for shielding from on-site structures. 3 See Table 7 for ambient noise measurements.

As shown in Table 13, existing ambient L50 and Lmax noise levels currently exceed daytime and nighttime City thresholds. Referenced car wash equipment manufacturer specifications noise levels are shown in Lmax, the attenuated noise levels in Table 13 represent Lmax values that are evaluated against the City's Lmax exterior noise standard. Cumulative vacuum and tunnel dryer Lmax noise levels would not exceed the existing ambient noise levels at the nearest residential receptor to the southwest and commercial uses to the north. Proposed project car wash operational noise levels would not exceed the City’s 75 dBA Lmax daytime and 70 dBA Lmax nighttime exterior noise standards. Furthermore, Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period. Conservatively assuming Table 13 Lmax car wash noise levels occurred 50% over a given sample period, operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards as well. In addition, car wash operational noise would be less than the existing ambient noise by approximately 8 dBA to 12 dBA. Therefore, project related operational car wash noise impacts would be less than significant.

Loading and Unloading
The proposed project includes a mix of commercial and retail uses that would include loading and unloading activities. The nearest residential receptor is approximately 1,800 feet west from the nearest proposed retail building with loading docks (see “Major Retail E and I” on Figure 2). PlaceWorks staff collected noise measurements for loading dock operations with trailers that have truck refrigeration units (TRU).

Measurements data showed a single TRU generated average noise levels 63.0 dBA L50 at 20 feet. The nearest “Major Retail” buildings support three trailers at each loading dock. At a distance of 1,800 feet, operations from a single TRU would attenuate to approximately 24 dBA L50. When accounting for three TRUs operating simultaneously, noise would be up to 29 dBA L50 at the nearest residences. Assuming all seven Major Retail loading docks were operating simultaneously, noise would be up to 38 dBA L50 at the nearest residences.

Proposed project loading and unloading operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. In addition, loading dock operational noise would be less than the existing ambient noise. Therefore, project related operational loading dock noise impacts would be less than significant.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 33
Mechanical Equipment
The proposed project would include the use of rooftop heating, ventilation, and cooling (HVAC) systems for the commercial and retail buildings. HVAC equipment would be no closer than 360 feet from the nearest receptor property line. Typical HVAC noise is approximately 72 dBA at a distance of 3 feet (York 2026). At 360 feet, HVAC noise would attenuate to approximately 30 dBA Leq. Because HVAC mechanical equipment is a steady-state noise source, the Leq would not vary considerably from the L50. Therefore, HVAC noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. Additionally, HVAC noise levels would be below the existing ambient noise level of 67.3 dBA Leq at the nearest residence (see Table 7 at measurement ST-2). Therefore, project related operational HVAC noise impacts would be less than significant.

Drive-Thru Operations
The proposed project would include multiple drive-thru restaurants with varying hours of operation. Noise associated with drive-thru windows would be predominantly from the speaker boxes. Field measurements by PlaceWorks staff measured typical drive-thru speaker box noise at approximately 73.6 dBA L50 at 4 feet. The closest noise-sensitive receptor to a proposed drive-thru speaker box is approximately 650 feet to the southwest, adjacent to Rosedale Highway on the north side of the proposed Pad 1, See Figure 2. At 650 feet, noise levels would attenuate to approximately 52 dBA L50, without accounting for shielding provided by the proposed Pad 1 building. Conservatively assuming an 8 dBA reduction to account for shielding that would be provided by the Pad 1 building, speaker box noise levels would be approximately 46 dBA L50 at the nearest noise sensitive receptors. Therefore, speaker box noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards, and impacts would be less than significant.

Combined Stationary Source Noise
Ambient noise levels measured 67.3 dBA Leq, 57.6 dBA L50, and 83.5 dBA Lmax at the nearest residence (see Table 7 at measurement ST-2) to the project site. The combined noise level from operation of the proposed Project at the nearest residence to the southwest would be approximately 51 dBA L50, when accounting for existing and proposed intervening structures. Combined Project noise levels would not exceed the City’s 55 dBA L50 daytime exterior noise standard at the nearest noise sensitive residential use to the southwest. Project operational hours would not extend past 10:00 PM on any given day, which would result in combined stationary noise levels that would comply with the 50 dBA L50 nighttime exterior noise standard at the nearest noise sensitive residential use to the southwest. Additionally, combined noise levels would be below existing ambient noise levels. Therefore, combined stationary noise impacts would be less than significant.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY O F BAK ERSFIELD

5. Environmental Impacts

Page 34 ends

NOISE-3 The project would not create excessive short-term or long-term groundborne vibration and groundborne noise. [Threshold N-2]
Construction Vibration
Potential vibration impacts associated with development projects are usually related to the use of heavy construction equipment during the demolition and grading phases of construction. Construction can generate varying degrees of ground vibration depending on the construction procedures and equipment. Construction equipment generates vibration that spreads through the ground and diminishes with distance from the source.

The effect on buildings in the vicinity of the construction site varies depending on soil type, ground strata, and receptor-building construction. The effects from vibration can range from no perceptible effects at the lowest vibration levels, to low rumbling sounds and perceptible vibrations at moderate levels, to slight structural damage at the highest levels. Vibration from construction activities rarely reaches the levels that can damage structures. Pile driving is not proposed.

Architectural Damage
The FTA criteria for architectural damage varies based on the building category. The applicable FTA threshold for the surrounding off-site commercial structures is 0.30 in/sec PPV, and the applicable FTA threshold for residential uses is 0.20 in/sec PPV. At a distance greater than approximately 20 feet, construction-generated vibration levels at the commercial buildings would be less than the 0.30 in/sec PPV threshold, and at a distance greater than approximately 25 feet, vibration levels would be less than the 0.20 in/sec PPV threshold. To determine potential vibration-induced architectural damage, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 project site area. Table 14, Vibration Impact Levels for Phase 1 Construction Equipment (in/sec PPV), summarizes vibration levels at the various receptors. As shown in Table 14, Phase 1 construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential structures, respectively.

Table 14 Vibration Levels for Phase 1 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference levels
at 25 feet
Commercial to north
at 180 feet1
Commercial to east
at 395 feet1
Residential to
south at 130 feet1
Commercial to west
at 55 feet1
Vibratory Roller 0.21 0.011 0.003 0.018 0.064
Large Bulldozer 0.089 0.005 0.001 0.008 0.027
Caisson Drilling 0.089 0.005 0.001 0.008 0.027
Loaded Trucks 0.076 0.004 0.001 0.006 0.023
Jackhammer 0.035 0.002 0.001 0.003 0.011
Small Bulldozer 0.003 0.000 0.000 0.000 0.001
Source: FTA 2018. Calculations included in Appendix D. 1 As measured from the nearest edge of construction site to structure/building facade.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 35
The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site area. Table 15, Vibration Impact Levels for Phase 2 Construction Equipment (in/sec PPV), summarizes vibration levels at the various receptors. As shown in Table 15, Phase 1 construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively.

Table 15 Vibration Levels for Phase 2 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east at 465
feet1
Residential to west at 1,770
feet1
Vibratory Roller 0.21 0.001 0.003 0.000
Large Bulldozer 0.089 0.000 0.001 0.000
Caisson Drilling 0.089 0.000 0.001 0.000
Loaded Trucks 0.076 0.000 0.001 0.000
Jackhammer 0.035 0.000 0.000 0.000
Small Bulldozer 0.003 0.000 0.000 0.000
Source: FTA 2018. Calculations included in Appendix D. 1 As measured from the nearest edge of construction site to structure/building facade.

As demonstrated in Tables 14 and 15, construction vibration levels due to Phase 1 and Phase 2 of the proposed project would be below the FTA thresholds for vibration levels and would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively. Therefore, project related architectural damage vibration impacts would be less than significant.

Vibration Annoyance
The City of Bakersfield does not have specific thresholds for vibration-induced annoyance related to construction activities. For purposes of this analysis, the threshold of 75 VdB will be used to determine impact significance for human vibration annoyance for residential uses and 85 VdB will be used for commercial uses.

At a distance greater than approximately 50 feet, construction-generated vibration levels would be less than the 85 VdB or less, and at a distance greater than approximately 85 feet, vibration levels would be 78 VdB or less.

To determine potential vibration-induced annoyance, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 project site area. Table 16, Vibration Impact Levels for Phase 1 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 16, Phase 1 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY O F BAK ERSFIELD

5. Environmental Impacts

Page 36 ends

Table 16 Vibration Levels for Phase 1 Construction Equipment (VdB) Equipment
Levels in VdB
Reference levels
at 25 feet
Commercial to north
at 180 feet1
Commercial to east
at 395 feet1
Residential to
south at 130 feet1
Commercial to west
at 55 feet1
Vibratory Roller 94 68 58 73 84
Large Bulldozer 87 61 51 66 77
Caisson Drilling 87 61 51 66 77
Loaded Trucks 86 60 50 65 76
Jackhammer 79 53 43 58 69
Small Bulldozer 58 32 22 37 48
Source: FTA 2018. Calculations included in Appendix D. 1 As measured from the nearest edge of construction site to structure/building facade.

The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site area. Table 17, Vibration Impact Levels for Phase 2 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 17, Phase 2 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

Table 17 Vibration Levels for Phase 2 Construction Equipment (VdB) Equipment
Levels in VdB
Reference levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east at 465
feet1
Residential to west at 1,770
feet1
Vibratory Roller 94 44 56 38
Large Bulldozer 87 37 49 31
Caisson Drilling 87 37 49 31
Loaded Trucks 87 37 49 31
Jackhammer 86 36 48 30
Small Bulldozer 79 29 41 23
Source: FTA 2018. Calculations included in Appendix D. 1 As measured from the nearest edge of construction site to structure/building facade.

As demonstrated in Tables 16 and 17, construction vibration levels due to Phase 1 and Phase 2 of the proposed project would be below the FTA thresholds for vibration levels and would not exceed the 85 and 78 VdB in/sec PPV thresholds at the nearest commercial and residential receptors, respectively. Therefore, project related architectural damage vibration impacts would be less than significant.

Operational Vibration
Commercial operations would generate varying degrees of ground vibration, depending on the operational procedures and equipment. Commercial uses would not be immediately adjacent to vibration-sensitive uses and no significant vibration impacts would occur from vibration generated by proposed project uses. The proposed project is not the type of land use that could generate significant vibration. Proposed project operation would not include any substantial long-term vibration sources. Therefore, project related operational vibration impacts would be less than significant.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

5. Environmental Impacts
April 2026 Page 37
NOISE-4 The proximity of the project site to an airport or airstrip would not result in exposure of future customers and/or workers to excessive airport-related noise. [Threshold N-3] The nearest airport to the project site is the Meadows Field Airport, approximately 3.5 miles to the northeast (Airnav.com 2023). The proposed project would not expose people residing or working in the project area to excessive aircraft noise levels. Therefore, no impact would occur.

CONCLUSION
As demonstrated in the analysis provided above, the proposed project would not result in any significant construction- or operational-related noise or vibration impacts. The proposed project would also not result in the exposure of future customers and/or workers to excessive airport-related noise. Because no significant impacts were identified, no mitigation measures are necessary.

5.3 RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY O F BAK ERSFIELD

5. Environmental Impacts

Page 38 ends

This page intentionally left blank.

April 2026 Page 39

6. References
AirNav, LLC. 2023. Airport Information. Accessed January 11, 2023. http://www.airnav.com/airports.

Bakersfield, City of. December 2002. General Plan Noise Element. https://content.civicplus.com/api/assets/37a2e20d-e610-431f-a222-9f4f2ecd2ddd.

Bakersfield, City of. October 2022. City of Bakersfield Municipal Code. https://bakersfield.municipal.codes/Code/9.22
California Department of Transportation (Caltrans). 2013, September. Technical Noise Supplement (“TeNS”).

Prepared by ICF International. Available at:
http://www.dot.ca.gov/hq/env/noise/pub/TeNS_Sept_2013B.pdf ———. 2020, April. Transportation and Construction Vibration Guidance Manual. Prepared by ICF International. https://dot.ca.gov/programs/environmental-analysis/noise-vibration/guidance-manuals Federal Highway Administration. 2006. Roadway Construction Noise Model (RCNM), Version 1.1. Available at:
https://www.fhwa.dot.gov/Environment/noise/construction_noise/rcnm/ Federal Transit Administration. 2018, September. Transit Noise and Vibration Impact Assessment Manual. US Department of Transportation.

Integrated Engineering Group. 2022. Rosedale & Coffee Commercial and Retail Project Traffic Assessment.

York. 2026. Heating and Air Conditioning Technical Guide https://www.upgnet.com/dsmarketingprod/gatekeeper/Documents/Archive_CDs/York_2014/PD F_FILES/528195-ytg-l-1014.pdf

RIVERVIEW MARKET PROJECT NOISE AND VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD

6. References

Page 40 ends

This page intentionally left blank.
.

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD
Appendices
February 2026
Appendix A. Noise and Vibration

RIVERVIEW MARKET PROJECT NOISE & VIBRATION TECHNICAL STUDY

CITY OF BAKERSFIELD
Appendices
PlaceWorks
This page intentionally left blank.
........................................................................................................................

N OISE M ONITORING D ATA
Date:

Site:

Hour Leq Lmax L50 L90
14:00 73.6 90.6 71.2 63.2 Leq Lmax L50 L90
15:00 74.1 93.7 71.9 63.9 74.9 94.5 71.8 63.716:00 75.6 102.2 71.8 63.7 72.4 90.5 68.8 61.017:00 75.8 96.8 72.1 64.5 71.5 89.7 62.4 55.618:00 74.6 93.5 71.8 63.519:00 73.4 91.7 70.5 63.120:00 72.3 86.4 68.7 61.021:00 71.2 93.5 67.1 59.0 Daytime 68%22:00 75.4 106.4 66.2 58.9 Evening 9%23:00 68.5 83.4 63.4 57.0 Nighttime 23% 0:00 67.0 82.6 60.0 53.11:00 67.0 85.0 58.3 51.42:00 65.5 82.4 55.7 51.23:00 66.6 82.9 58.4 52.04:00 69.9 90.0 63.6 56.25:00 72.3 92.6 66.2 58.86:00 76.0 102.1 69.6 62.17:00 74.7 88.8 71.1 64.08:00 75.1 98.3 71.7 64.19:00 74.8 97.5 71.0 62.9 10:00 74.3 88.5 71.8 63.111:00 76.0 99.6 72.8 63.512:00 75.7 98.7 71.9 64.513:00 73.9 85.8 72.2 64.0 Calculated CNEL, dBA

78.7 Daytime (7 a.m. - 7 p.m.)
Evening (7 p.m. - 9 p.m.)
Nighttime (9 p.m. - 7 a.m.)
Percentage of Energy
Long-Term 24 Hour Continuous Noise Monitoring
Calculation Input Sheet
Averages
Project: LOKH-01
November 17-18, 2022LT-1
Project: LOKH-01
User: AK
Location: LT-1
No. Start Date Start Time End Time Duration Leq Lmax Lmin L1 L2 L5 L8 L10 L25 L50 L90 L95 L99 1 11/17/2022 2:00 PM 3:00 PM 1:00 73.6 90.6 51.9 80.3 79.5 78.5 77.8 77.4 74.8 71.2 63.2 60.2 55.52 11/17/2022 3:00 PM 4:00 PM 1:00 74.1 93.7 54.8 80.5 79.7 78.6 78.0 77.6 75.4 71.9 63.9 61.0 57.23 11/17/2022 4:00 PM 5:00 PM 1:00 75.6 102.2 54.9 82.0 80.1 78.8 77.9 77.6 75.5 71.8 63.7 61.6 57.64 11/17/2022 5:00 PM 6:00 PM 1:00 75.8 96.8 57.2 83.3 80.5 78.9 78.3 78.0 75.9 72.1 64.5 62.4 59.75 11/17/2022 6:00 PM 7:00 PM 1:00 74.6 93.5 54.5 82.0 80.6 79.2 78.5 78.1 75.5 71.8 63.5 61.3 57.76 11/17/2022 7:00 PM 8:00 PM 1:00 73.4 91.7 56.3 80.7 79.7 78.5 77.8 77.3 74.6 70.5 63.1 61.3 58.77 11/17/2022 8:00 PM 9:00 PM 1:00 72.3 86.4 54.4 80.0 79.1 77.9 77.2 76.7 73.6 68.7 61.0 59.3 56.58 11/17/2022 9:00 PM 10:00 PM 1:00 71.2 93.5 54.1 79.1 78.1 76.8 75.9 75.4 71.4 67.1 59.0 57.8 55.79 11/17/2022 10:00 PM 11:00 PM 1:00 75.4 106.4 55.0 81.4 79.4 77.4 76.0 75.3 71.4 66.2 58.9 57.9 56.5 10 11/17/2022 11:00 PM 12:00 AM 1:00 68.5 83.4 53.2 78.0 76.8 74.8 73.4 72.7 68.4 63.4 57.0 56.0 54.311 11/17/2022 12:00 AM 1:00 AM 1:00 67.0 82.6 48.9 77.8 76.5 74.0 72.2 71.0 65.6 60.0 53.1 52.1 50.212 11/18/2022 1:00 AM 2:00 AM 1:00 67.0 85.0 47.4 78.3 76.5 73.7 71.9 70.7 65.1 58.3 51.4 50.3 48.713 11/18/2022 2:00 AM 3:00 AM 1:00 65.5 82.4 47.1 77.6 75.5 72.5 70.4 69.2 62.2 55.7 51.2 50.3 48.114 11/18/2022 3:00 AM 4:00 AM 1:00 66.6 82.9 48.4 77.1 75.9 73.4 71.6 70.6 65.2 58.4 52.0 51.0 49.615 11/18/2022 4:00 AM 5:00 AM 1:00 69.9 90.0 51.4 80.3 78.8 76.1 74.5 73.6 68.4 63.6 56.2 55.2 53.816 11/18/2022 5:00 AM 6:00 AM 1:00 72.3 92.6 54.8 82.3 81.1 78.7 77.0 76.2 71.2 66.2 58.8 57.8 56.217 11/18/2022 6:00 AM 7:00 AM 1:00 76.0 102.1 56.7 83.1 81.7 79.8 78.6 78.0 74.0 69.6 62.1 60.7 58.618 11/18/2022 7:00 AM 8:00 AM 1:00 74.7 88.8 58.4 82.3 81.8 80.5 79.7 79.1 75.6 71.1 64.0 62.6 60.619 11/18/2022 8:00 AM 9:00 AM 1:00 75.1 98.3 56.8 82.2 81.4 80.0 79.1 78.7 75.8 71.7 64.1 62.2 59.420 11/18/2022 9:00 AM 10:00 AM 1:00 74.8 97.5 56.5 81.0 80.3 79.4 78.7 78.2 75.6 71.0 62.9 60.6 58.221 11/18/2022 10:00 AM 11:00 AM 1:00 74.3 88.5 55.8 80.8 80.4 79.5 78.7 78.2 75.9 71.8 63.1 60.5 57.822 11/18/2022 11:00 AM 12:00 PM 1:00 76.0 99.6 56.5 81.8 80.6 79.6 78.9 78.5 76.3 72.8 63.5 60.9 58.723 11/18/2022 12:00 PM 1:00 PM 1:00 75.7 98.7 55.0 82.0 79.9 78.9 78.2 77.9 75.8 71.9 64.5 62.5 59.024 11/18/2022 1:00 PM 2:00 PM 1:00 73.9 85.8 54.1 80.2 79.4 78.3 77.7 77.4 75.5 72.2 64.0 60.8 57.3 Measurement Report
Report Summary
Meter's File Name LxT_Data.008.s Computer's File Name LxT_0005426-20221117 165803-LxT_Data.008.ldbin Meter LxT1 0005426 Firmware 2.404
User AK Location ST-1
Job Description LOKH-01 Riverview Market
Note
Start Time 2022-11-17 16:58:03 Duration 0:15:05.2
End Time 2022-11-17 17:13:08 Run Time 0:15:05.2 Pause Time 0:00:00.0 Pre-Calibration 2022-11-17 15:33:50 Post-Calibration None Calibration Deviation --- Results
Overall Metrics
LAeq

80.2 dB
LAE 109.8 dB SEA 131.5 dB
EA 10.5 mPa²h
EA8 335.1 mPa²h
EA40 1.7 Pa²h
LZSpeak 121.5 dB 2022-11-17 17:12:38
LASmax 101.8 dB 2022-11-17 17:10:21
LASmin 58.0 dB 2022-11-17 17:04:05
LAeq 80.2 dB
LCeq 84.4 dB LCeq - LAeq 4.2 dB
LAIeq 83.7 dB LAIeq - LAeq 3.5 dB
Exceedances Count Duration
LAS > 85.0 dB 7 0:00:33.4
LAS > 90.0 dB 3 0:00:13.9
LZSpk > 105.0 dB 9 0:00:17.0
LZSpk > 137.0 dB 0 0:00:00.0
LZSpk > 140.0 dB 0 0:00:00.0
Community Noise LDN LDay LNight
--- dB --- dB 0.0 dB
LDEN LDay LEve LNight
--- dB --- dB --- dB --- dB
Any Data A C Z
Level Time Stamp Level Time Stamp Level Time Stamp
Leq 80.2 dB --- dB --- dB
Ls(max) 101.8 dB 2022-11-17 17:10:21 --- dB None --- dB None LS(min) 58.0 dB 2022-11-17 17:04:05 --- dB None --- dB None LPeak(max) --- dB None --- dB None 121.5 dB 2022-11-17 17:12:38 Overloads Count Duration OBA Count OBA Duration
0 0:00:00.0 3 0:00:06.8
Statistics
LAS 2.0 86.8 dB
LAS 8.0 81.2 dB
LAS 25.0 78.7 dB
LAS 50.0 73.9 dB
LAS 90.0 63.4 dB
LAS 100.0 58.1 dB
Measurement Report
Report Summary
Meter's File Name LxT_Data.007.s Computer's File Name LxT_0005426-20221117 163318-LxT_Data.007.ldbin Meter LxT1 0005426 Firmware 2.404
User AK Location ST-2
Job Description LOKH-01 Riverview Market
Note
Start Time 2022-11-17 16:33:18 Duration 0:15:02.2
End Time 2022-11-17 16:48:21 Run Time 0:15:02.2 Pause Time 0:00:00.0 Pre-Calibration 2022-11-17 15:33:50 Post-Calibration None Calibration Deviation --- Results
Overall Metrics
LAeq

67.3 dB
LAE 96.9 dB SEA --- dB
EA 538.3 µPa²h
EA8 17.2 mPa²h
EA40 85.9 mPa²h
LZSpeak 108.7 dB 2022-11-17 16:48:00
LASmax 83.5 dB 2022-11-17 16:48:01
LASmin 50.1 dB 2022-11-17 16:33:51
LAeq 67.3 dB
LCeq 76.0 dB LCeq - LAeq 8.7 dB
LAIeq 70.3 dB LAIeq - LAeq 3.0 dB
Exceedances Count Duration
LAS > 85.0 dB 0 0:00:00.0
LAS > 90.0 dB 0 0:00:00.0
LZSpk > 105.0 dB 3 0:00:03.7
LZSpk > 137.0 dB 0 0:00:00.0
LZSpk > 140.0 dB 0 0:00:00.0
Community Noise LDN LDay LNight
--- dB --- dB 0.0 dB
LDEN LDay LEve LNight
--- dB --- dB --- dB --- dB
Any Data A C Z
Level Time Stamp Level Time Stamp Level Time Stamp
Leq 67.3 dB --- dB --- dB
Ls(max) 83.5 dB 2022-11-17 16:48:01 --- dB None --- dB None LS(min) 50.1 dB 2022-11-17 16:33:51 --- dB None --- dB None LPeak(max) --- dB None --- dB None 108.7 dB 2022-11-17 16:48:00 Overloads Count Duration OBA Count OBA Duration
0 0:00:00.0 0 0:00:00.0
Statistics
LAS 2.0 77.4 dB
LAS 8.0 72.7 dB
LAS 25.0 64.1 dB
LAS 50.0 57.6 dB
LAS 90.0 53.0 dB
LAS 100.0 50.2 dB
Measurement Report
Report Summary
Meter's File Name LxT_Data.006.s Computer's File Name LxT_0005426-20221117 153258-LxT_Data.006.ldbin Meter LxT1 0005426 Firmware 2.404
User AK Location ST-3
Job Description LOKH-01 Riverview Market
Note
Start Time 2022-11-17 15:32:58 Duration 0:00:20.9
End Time 2022-11-17 15:33:19 Run Time 0:00:20.9 Pause Time 0:00:00.0 Pre-Calibration 2022-11-17 14:11:07 Post-Calibration None Calibration Deviation --- Results
Overall Metrics
LAeq

93.9 dB
LAE 107.1 dB SEA --- dB
EA 5.7 mPa²h
EA8 7.9 Pa²h
EA40 39.3 Pa²h
LZSpeak 100.1 dB 2022-11-17 15:33:10
LASmax 94.0 dB 2022-11-17 15:33:18
LASmin 93.9 dB 2022-11-17 15:32:59
LAeq 93.9 dB
LCeq 94.0 dB LCeq - LAeq 0.1 dB
LAIeq 93.9 dB LAIeq - LAeq 0.0 dB
Exceedances Count Duration
LAS > 85.0 dB 1 0:00:20.9
LAS > 90.0 dB 1 0:00:20.9
LZSpk > 105.0 dB 0 0:00:00.0
LZSpk > 137.0 dB 0 0:00:00.0
LZSpk > 140.0 dB 0 0:00:00.0
Community Noise LDN LDay LNight
--- dB --- dB 0.0 dB
LDEN LDay LEve LNight
--- dB --- dB --- dB --- dB
Any Data A C Z
Level Time Stamp Level Time Stamp Level Time Stamp
Leq 93.9 dB --- dB --- dB
Ls(max) 94.0 dB 2022-11-17 15:33:18 --- dB None --- dB None LS(min) 93.9 dB 2022-11-17 15:32:59 --- dB None --- dB None LPeak(max) --- dB None --- dB None 100.1 dB 2022-11-17 15:33:10 Overloads Count Duration OBA Count OBA Duration
0 0:00:00.0 0 0:00:00.0
Statistics
LAS 2.0 94.0 dB
LAS 8.0 94.0 dB
LAS 25.0 94.0 dB
LAS 50.0 93.9 dB
LAS 90.0 93.9 dB
LAS 100.0 93.9 dB
........................................................................................................................

C ONSTRUCTION M ODELING R ESULTS
LOKH-01 - Phase 1 Construction Noise Modeling Attenuation Calculations Levels in dBA Leq
Phase
RCNM Reference
Noise Level
Commercial
Receptor to North
Commercial
Receptor to East
Residential
Receptor to South
Commercial
Receptor to West
Distance in feet 50 300 580 275 225
Site Preparation 84 68 62 69 71Rough Grading 84 69 63 70 71Fine Grading 83 67 61 68 70 Distance in feet 50 215 415 380 70
Building Construction 75 62 56 57 72Architectural Coating 77 64 58 59 74 Distance in feet 50 180 395 130 55
Paving 79 68 61 71 78
Distance in feet 50 200 415 185 65
Utilities Trenching 81 69 62 69 78Other
Attenuation calculated through Inverse Square Law: Lp(R2) = Lp(R1) - 20Log(R2/R1) LOKH-01 - Phase 2 Construction Noise Modeling Attenuation Calculations Levels in dBA Leq
Phase
RCNM Reference
Noise Level
Commercial
Receptor to North
Commercial
Receptor to East
Residnetial
Receptor to West
Distance in feet 50 1,350 585 1,950
Site Preparation 84 55 62 52Rough Grading 84 56 63 53Fine Grading 83 54 61 51 Distance in feet 50 1,200 505 1,825
Building Construction 75 47 54 43Architectural Coating 77 49 57 45 Distance in feet 50 1,150 465 1,770
Paving 79 52 60 48
Distance in feet 50 1,175 435 1,795
Utilities Trenching 81 53 62 50Other
Attenuation calculated through Inverse Square Law: Lp(R2) = Lp(R1) - 20Log(R2/R1) Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Site Preparation **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Grader No 40 85.0 50.0 0.0Tractor No 40 84.0 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Grader 85.0 81.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ATractor 84.0 80.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 85.0 83.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Rough Grading **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Grader No 40 85.0 50.0 0.0Scraper No 40 83.6 50.0 0.0Dozer No 40 81.7 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Grader 85.0 81.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AScraper 83.6 79.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ADozer 81.7 77.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 85.0 84.4 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Fine Grading **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Grader No 40 85.0 50.0 0.0Front End Loader No 40 79.1 50.0 0.0Backhoe No 40 77.6 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Grader 85.0 81.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AFront End Loader 79.1 75.1 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ABackhoe 77.6 73.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 85.0 82.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Utilities Trenching **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Excavator No 40 80.7 50.0 0.0Excavator No 40 80.7 50.0 0.0Backhoe No 40 77.6 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Excavator 80.7 76.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AExcavator 80.7 76.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ABackhoe 77.6 73.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 80.7 80.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Building Construction **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Crane No 16 80.6 50.0 0.0Welder / Torch No 40 74.0 50.0 0.0Forklift No 40 0.0 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Crane 80.6 72.6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AWelder / Torch 74.0 70.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AForklift 0.0 -4.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 80.6 74.5 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Asphalt Paving **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Paver No 50 77.2 50.0 0.0Roller No 20 80.0 50.0 0.0Front End Loader No 40 79.1 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Paver 77.2 74.2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ARoller 80.0 73.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/AFront End Loader 79.1 75.1 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 80.0 79.0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Roadway Construction Noise Model (RCNM),Version 1.1
Report date: 02/05/2026Case Description: LOKH-01 - Architectural Coating **** Receptor #1 **** Baselines (dBA)Description Land Use Daytime Evening Night----------- -------- ------- ------- -----Receptor at 50 feet Residential 65.0 60.0 55.0 Equipment --------- Spec Actual Receptor Estimated Impact Usage Lmax Lmax Distance ShieldingDescription Device (%) (dBA) (dBA) (feet) (dBA)----------- ------ ----- ----- ----- -------- ---------Compressor (air) No 40 77.7 50.0 0.0Compressor (air) No 40 77.7 50.0 0.0 Results ------- Noise Limits (dBA) Noise Limit Exceedance (dBA) ---------------------------------------------- ---------------------------------------------- Calculated (dBA) Day Evening Night Day Evening Night ---------------- -------------- ------------- -------------- -------------- -------------- --------------Equipment Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq Lmax Leq---------------------- ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ ------Compressor (air) 77.7 73.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/ACompressor (air) 77.7 73.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Total 77.7 76.7 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A LOKH-01 - Phase 1 Vibration Damage Attenuation Calculations Levels, PPV (in/sec)
Commercial
Receptor to North
Commercial
Receptor to East
Residential Receptor
to South
Commercial
Receptor to West
Distance in feet 180 395 130 55
Vibratory Roller 0.21 0.011 0.003 0.018 0.064Large Bulldozer 0.089 0.005 0.001 0.008 0.027Caisson Drilling 0.089 0.005 0.001 0.008 0.027Loaded Trucks 0.076 0.004 0.001 0.006 0.023Jackhammer 0.035 0.002 0.001 0.003 0.011Small Bulldozer 0.003 0.000 0.000 0.000 0.001 Vibration
Reference Level
at 25 feet
LOKH-01 - Phase 2 Vibration Damage Attenuation Calculations Levels, PPV (in/sec)
Commercial
Receptor to North
Commercial
Receptor to East
Residnetial Receptor
to West
Distance in feet 1150 465 1770
Vibratory Roller 0.21 0.001 0.003 0.000Large Bulldozer 0.089 0.000 0.001 0.000Caisson Drilling 0.089 0.000 0.001 0.000Loaded Trucks 0.076 0.000 0.001 0.000Jackhammer 0.035 0.000 0.000 0.000Small Bulldozer 0.003 0.000 0.000 0.000 Vibration
Reference Level
at 25 feet
LOKH-01 - Phase 1 Vibration Annoyance Attenuation Calculations Levels in VdB
Equipment
Commercial Receptor
to North
Commercial Receptor
to East
Residential Receptor
to South
Commercial Receptor
to West
Distance in feet 180 395 130 55
Vibratory Roller 94 68 58 73 84
Large Bulldozer 87 61 51 66 77
Caisson Drilling 87 61 51 66 77
Loaded Trucks 86 60 50 65 76
Jackhammer 79 53 43 58 69
Small Bulldozer 58 32 22 37 48
Vibration @ 25 ft
LOKH-01 - Phase 2 Vibration Annoyance Attenuation Calculations Levels in VdB
Equipment
Commercial Receptor
to North
Commercial Receptor
to East
Residnetial Receptor
to West
Distance in feet 1150 465 1770
Vibratory Roller 94 44 56 38
Hoe Ram 87 37 49 31
Large Bulldozer 87 37 49 31
Caisson Drilling 87 37 49 31
Loaded Trucks 86 36 48 30
Jackhammer 79 29 41 23
Small Bulldozer 58 8 20 2
Vibration @ 25 ft
........................................................................................................................

T RAFFIC M ODELING R ESULTS
ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 69.8 72.6 73.3 83 179 385 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 22,291 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.5 73.3 73.9 91 197 425 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 25,807 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 71.6 74.4 75.1 109 235 506 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 31,761 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 4 71.8 74.6 75.3 112 242 521 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 33,172 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 5 71.9 74.7 75.4 114 247 531 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 34,182 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 686 71.5 74.3 74.9 107 230 495 Rosedale Highway (CA-58) Coffee Road to Patton Way 30,790 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 71.5 74.3 74.9 107 230 496 Coffee Road Olive Drive to Hageman Road 24,459 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 72.2 75.0 75.7 120 258 556 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 29,066 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.1 75.9 76.6 138 297 640 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 35,841 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 73.4 76.2 76.8 143 308 663 Coffee Road Downing Avenue to Granite Falls Drive 37,867 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.1 75.9 76.6 138 297 639 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 35,814 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 73.9 76.7 77.3 154 332 716 Coffee Road Rosedale Highway (CA-58) to Jet Way 42,426 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 73.9 76.7 77.4 155 335 721 Coffee Road Jet Way to Brimhall Road 42,941 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 14 74.7 77.5 78.2 176 379 817 Coffee Road Brimhall Road to Westside Parkway EB Ramps 51,734 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 73.9 76.7 77.4 156 336 724 Coffee Road Westside Parkway EB Ramps to Truxtun Road 43,166 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 16 74.8 77.5 78.2 177 381 821 Coffee Road Truxtun Road and Stockdale Highway 52,165 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 71.8 74.6 75.3 113 244 525 Calloway Drive Noriega Road to Hageman Road 26,639 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.1 74.9 75.5 117 252 543 Calloway Drive Hageman Road to Meacham Road 28,037 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.3 75.1 75.8 121 261 563 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 31,286 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.2 76.0 76.6 139 299 644 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 38,237 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 65.7 68.5 69.2 44 96 206 Brimhall Road Allen Road to Old Farm Road 8,709 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 4422 66.6 69.4 70.1 51 109 235 Brimhall Road Old Farm Road to Jewetta Avenue 10,604 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.3 70.1 70.8 56 121 262 Brimhall Road Jewetta Avenue to Verdugo Lane 12,485 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.1 70.9 71.5 63 137 294 Brimhall Road Verdugo Lane to Calloway Drive 14,892 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 68.4 71.2 71.9 67 143 309 Brimhall Road Calloway Drive to Harvest Creek Road 16,029 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 68.8 71.6 72.3 71 153 329 Brimhall Road Harvest Creek Road to Coffee Road 16,644 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 27 69.4 72.2 72.8 77 167 359 Hageman Road Calloway Drive to Coffee Road 24,360 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) Existing 2025 Traffic Noise Traffic Conditions dBA at 50 feet Distance to CNEL Contour
Output Inputs Auto Inputs
ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 69.8 72.6 73.3 83 179 385 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 22,291 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.5 73.3 73.9 91 197 425 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 25,807 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 71.6 74.4 75.1 109 235 506 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 31,762 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 684 71.8 74.6 75.3 112 242 521 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 33,173 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 5 71.9 74.7 75.4 114 247 531 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 34,183 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 686 71.5 74.3 74.9 107 230 495 Rosedale Highway (CA-58) Coffee Road to Patton Way 30,791 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 71.6 74.3 75.0 108 233 502 Coffee Road Olive Drive to Hageman Road 24,930 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 72.3 75.1 75.8 121 261 563 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 29,626 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.2 76.0 76.7 140 301 648 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 36,531 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 73.5 76.2 76.9 145 312 672 Coffee Road Downing Avenue to Granite Falls Drive 38,596 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.2 76.0 76.7 139 300 646 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 36,414 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 73.9 76.7 77.4 156 336 724 Coffee Road Rosedale Highway (CA-58) to Jet Way 43,136 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 74.0 76.8 77.5 157 339 730 Coffee Road Jet Way to Brimhall Road 43,705 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 14 74.8 77.6 78.3 178 383 825 Coffee Road Brimhall Road to Westside Parkway EB Ramps 52,545 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.0 76.8 77.5 158 340 731 Coffee Road Westside Parkway EB Ramps to Truxtun Road 43,842 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 16 74.8 77.6 78.2 177 382 822 Coffee Road Truxtun Road and Stockdale Highway 52,238 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 71.9 74.7 75.4 114 246 529 Calloway Drive Noriega Road to Hageman Road 26,987 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.1 74.9 75.5 117 252 544 Calloway Drive Hageman Road to Meacham Road 28,102 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.3 75.1 75.8 122 262 564 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 31,358 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.2 76.0 76.7 139 300 647 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 38,538 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 65.8 68.6 69.3 45 96 207 Brimhall Road Allen Road to Old Farm Road 8,810 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 22 66.7 69.4 70.1 51 110 236 Brimhall Road Old Farm Road to Jewetta Avenue 10,727 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.4 70.1 70.8 57 122 264 Brimhall Road Jewetta Avenue to Verdugo Lane 12,629 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.1 70.9 71.6 64 138 297 Brimhall Road Verdugo Lane to Calloway Drive 15,064 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 68.4 71.2 71.9 67 145 311 Brimhall Road Calloway Drive to Harvest Creek Road 16,214 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 68.9 71.7 72.3 72 154 333 Brimhall Road Harvest Creek Road to Coffee Road 16,929 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

69.5 72.3 73.0 79 170 365 Hageman Road Calloway Drive to Coffee Road 25,019 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2027 No Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs dBA at 50 feet Distance to CNEL Contour ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 70.0 72.8 73.5 85 183 395 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 23,160 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.7 73.5 74.2 95 204 439 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 27,165 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 71.9 74.7 75.4 115 247 533 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 34,315 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 4 72.2 75.0 75.7 119 257 553 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 36,324 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 5 72.1 74.9 75.6 118 255 548 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 35,867 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 6 71.6 74.3 75.0 108 233 502 Rosedale Highway (CA-58) Coffee Road to Patton Way 31,389 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 71.7 74.5 75.2 111 239 515 Coffee Road Olive Drive to Hageman Road 25,908 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 72.5 75.3 76.0 125 269 580 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 30,930 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.4 76.2 76.9 144 310 668 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 38,269 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 73.7 76.5 77.1 150 322 694 Coffee Road Downing Avenue to Granite Falls Drive 40,552 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.4 76.2 76.9 144 311 671 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 38,478 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6812 74.1 76.9 77.6 161 347 748 Coffee Road Rosedale Highway (CA-58) to Jet Way 45,309 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 74.5 77.2 77.9 169 364 783 Coffee Road Jet Way to Brimhall Road 48,594 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 14 75.0 77.8 78.4 183 394 849 Coffee Road Brimhall Road to Westside Parkway EB Ramps 54,772 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.2 77.0 77.7 163 350 754 Coffee Road Westside Parkway EB Ramps to Truxtun Road 45,906 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 16 74.9 77.7 78.4 181 389 839 Coffee Road Truxtun Road and Stockdale Highway 53,868 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 72.0 74.8 75.4 115 248 535 Calloway Drive Noriega Road to Hageman Road 27,422 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.2 74.9 75.6 119 256 551 Calloway Drive Hageman Road to Meacham Road 28,645 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.4 75.2 75.9 123 265 572 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 32,010 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.3 76.1 76.8 141 305 656 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 39,353 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 66.0 68.8 69.5 46 99 214 Brimhall Road Allen Road to Old Farm Road 9,245 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 22 66.9 69.7 70.4 53 114 246 Brimhall Road Old Farm Road to Jewetta Avenue 11,379 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.7 70.5 71.2 60 129 279 Brimhall Road Jewetta Avenue to Verdugo Lane 13,716 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.5 71.2 71.9 67 145 312 Brimhall Road Verdugo Lane to Calloway Drive 16,259 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 68.9 71.6 72.3 72 154 332 Brimhall Road Calloway Drive to Harvest Creek Road 17,844 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 69.3 72.1 72.8 76 165 355 Brimhall Road Harvest Creek Road to Coffee Road 18,667 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

69.5 72.3 73.0 79 170 367 Hageman Road Calloway Drive to Coffee Road 25,128 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2027 with Phase 1 Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs dBA at 50 feet Distance to CNEL Contour ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 69.8 72.6 73.3 83 179 385 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 22,292 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.5 73.3 73.9 91 197 425 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 25,808 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 71.6 74.4 75.1 109 235 506 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 31,762 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 684 71.8 74.6 75.3 112 242 521 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 33,173 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 5 71.9 74.7 75.4 114 247 531 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 34,183 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 686 71.5 74.3 74.9 107 230 495 Rosedale Highway (CA-58) Coffee Road to Patton Way 30,791 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 71.6 74.4 75.1 109 235 505 Coffee Road Olive Drive to Hageman Road 25,165 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 72.3 75.1 75.8 122 263 567 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 29,905 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.3 76.0 76.7 140 303 652 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 36,876 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 73.5 76.3 77.0 146 314 676 Coffee Road Downing Avenue to Granite Falls Drive 38,960 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.2 76.0 76.7 140 302 650 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 36,714 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 74.0 76.8 77.4 157 338 728 Coffee Road Rosedale Highway (CA-58) to Jet Way 43,492 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 74.0 76.8 77.5 158 341 734 Coffee Road Jet Way to Brimhall Road 44,087 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6814 74.8 77.6 78.3 179 385 830 Coffee Road Brimhall Road to Westside Parkway EB Ramps 52,950 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.0 76.8 77.5 158 341 735 Coffee Road Westside Parkway EB Ramps to Truxtun Road 44,180 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6816 74.8 77.6 78.2 177 382 823 Coffee Road Truxtun Road and Stockdale Highway 52,275 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 71.9 74.7 75.4 115 247 532 Calloway Drive Noriega Road to Hageman Road 27,161 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.1 74.9 75.6 117 253 544 Calloway Drive Hageman Road to Meacham Road 28,134 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.3 75.1 75.8 122 262 564 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 31,394 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.2 76.0 76.7 140 301 649 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 38,689 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 65.8 68.6 69.3 45 97 208 Brimhall Road Allen Road to Old Farm Road 8,860 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 4422 66.7 69.5 70.1 51 110 237 Brimhall Road Old Farm Road to Jewetta Avenue 10,788 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.4 70.2 70.9 57 123 265 Brimhall Road Jewetta Avenue to Verdugo Lane 12,701 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.1 70.9 71.6 64 138 298 Brimhall Road Verdugo Lane to Calloway Drive 15,150 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 68.5 71.3 71.9 67 145 313 Brimhall Road Calloway Drive to Harvest Creek Road 16,307 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 68.9 71.7 72.4 72 155 334 Brimhall Road Harvest Creek Road to Coffee Road 17,072 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

69.5 72.3 73.0 79 171 369 Hageman Road Calloway Drive to Coffee Road 25,348 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 dBA at 50 feet Distance to CNEL Contour
Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2028 No Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs
ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 70.0 72.8 73.5 86 184 397 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 23,347 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.7 73.5 74.2 95 205 442 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 27,456 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 72.0 74.8 75.5 116 250 538 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 34,861 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 4 72.3 75.1 75.7 121 260 560 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 36,997 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 685 72.2 75.0 75.6 119 256 552 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 36,227 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 6 71.6 74.4 75.0 108 234 503 Rosedale Highway (CA-58) Coffee Road to Patton Way 31,516 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 71.8 74.6 75.3 112 242 521 Coffee Road Olive Drive to Hageman Road 26,352 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 72.6 75.4 76.0 126 272 587 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 31,487 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.5 76.3 77.0 146 314 676 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 38,986 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 73.8 76.5 77.2 152 326 703 Coffee Road Downing Avenue to Granite Falls Drive 41,333 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.5 76.3 77.0 146 315 679 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 39,219 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 74.2 77.0 77.7 163 351 757 Coffee Road Rosedale Highway (CA-58) to Jet Way 46,129 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 74.6 77.4 78.1 172 371 799 Coffee Road Jet Way to Brimhall Road 50,021 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 14 75.0 77.8 78.5 185 398 858 Coffee Road Brimhall Road to Westside Parkway EB Ramps 55,653 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.3 77.1 77.8 164 354 763 Coffee Road Westside Parkway EB Ramps to Truxtun Road 46,685 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 16 74.9 77.7 78.4 182 391 843 Coffee Road Truxtun Road and Stockdale Highway 54,253 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 72.0 74.8 75.5 116 250 538 Calloway Drive Noriega Road to Hageman Road 27,688 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.2 75.0 75.7 119 257 553 Calloway Drive Hageman Road to Meacham Road 28,793 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.4 75.2 75.9 124 266 574 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 32,185 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.3 76.1 76.8 142 306 660 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 39,678 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 66.1 68.9 69.5 47 100 216 Brimhall Road Allen Road to Old Farm Road 9,387 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 4422 67.0 69.8 70.5 54 116 249 Brimhall Road Old Farm Road to Jewetta Avenue 11,579 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.8 70.6 71.3 61 131 283 Brimhall Road Jewetta Avenue to Verdugo Lane 14,020 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.5 71.3 72.0 68 147 316 Brimhall Road Verdugo Lane to Calloway Drive 16,600 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 69.0 71.8 72.4 73 157 337 Brimhall Road Calloway Drive to Harvest Creek Road 18,285 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 69.4 72.2 72.9 78 168 361 Brimhall Road Harvest Creek Road to Coffee Road 19,182 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

69.6 72.4 73.0 80 172 370 Hageman Road Calloway Drive to Coffee Road 25,480 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 dBA at 50 feet Distance to CNEL Contour
Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2028 with Phase 1 and Phase 2 Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs
ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 69.8 72.6 73.3 83 179 385 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 22,295 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.5 73.3 73.9 91 197 425 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 25,812 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 71.6 74.4 75.1 109 235 506 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 31,767 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 684 71.8 74.6 75.3 112 242 521 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 33,179 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 5 71.9 74.7 75.4 114 247 531 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 34,189 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 686 71.5 74.3 74.9 107 230 495 Rosedale Highway (CA-58) Coffee Road to Patton Way 30,796 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 72.3 75.1 75.7 121 260 560 Coffee Road Olive Drive to Hageman Road 29,403 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 73.0 75.8 76.5 135 292 629 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 34,941 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 73.9 76.7 77.4 156 336 723 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 43,085 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 74.2 77.0 77.6 162 348 750 Coffee Road Downing Avenue to Granite Falls Drive 45,521 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 73.8 76.6 77.3 153 331 712 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 42,111 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 74.6 77.4 78.0 172 370 797 Coffee Road Rosedale Highway (CA-58) to Jet Way 49,886 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 74.7 77.4 78.1 174 375 809 Coffee Road Jet Way to Brimhall Road 50,966 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6814 75.4 78.2 78.9 195 420 904 Coffee Road Brimhall Road to Westside Parkway EB Ramps 60,245 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.6 77.4 78.1 173 372 801 Coffee Road Westside Parkway EB Ramps to Truxtun Road 50,267 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6816 74.8 77.6 78.3 179 385 829 Coffee Road Truxtun Road and Stockdale Highway 52,935 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 72.4 75.2 75.9 123 265 572 Calloway Drive Noriega Road to Hageman Road 30,294 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.2 75.0 75.6 119 256 552 Calloway Drive Hageman Road to Meacham Road 28,716 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.4 75.2 75.9 123 266 572 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 32,044 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.5 76.3 77.0 146 315 679 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 41,402 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 66.2 69.0 69.7 48 103 222 Brimhall Road Allen Road to Old Farm Road 9,766 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 4422 67.1 69.9 70.6 55 118 253 Brimhall Road Old Farm Road to Jewetta Avenue 11,891 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 67.8 70.6 71.3 61 131 282 Brimhall Road Jewetta Avenue to Verdugo Lane 14,000 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.6 71.4 72.0 68 147 318 Brimhall Road Verdugo Lane to Calloway Drive 16,699 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 68.9 71.7 72.4 72 155 334 Brimhall Road Calloway Drive to Harvest Creek Road 17,974 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 69.5 72.3 73.0 79 170 367 Brimhall Road Harvest Creek Road to Coffee Road 19,640 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

70.5 73.2 73.9 91 197 424 Hageman Road Calloway Drive to Coffee Road 31,279 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 dBA at 50 feet Distance to CNEL Contour
Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2046 No Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs
ID Leq-24hr Ldn CNEL 70 dBA 65 dBA 60 dBA Roadway Segment From - To ADT Posted Speed Limit Grade % Autos % Med Trucks % Heavy Trucks % Daytime % Evening % Night Number of Lanes Site Condition Distance to Reciever Ground Absorption Lane Distance 1 70.0 72.8 73.5 86 184 397 Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 23,350 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 2 70.7 73.5 74.2 95 205 443 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 27,460 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 3 72.0 74.8 75.5 116 250 538 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 34,866 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 4 72.3 75.1 75.7 121 260 560 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 37,003 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 685 72.2 75.0 75.6 119 256 552 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 36,233 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 6 71.6 74.4 75.0 108 234 503 Rosedale Highway (CA-58) Coffee Road to Patton Way 31,521 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 7 72.4 75.2 75.9 124 267 575 Coffee Road Olive Drive to Hageman Road 30,590 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 8 73.2 76.0 76.7 140 301 648 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 36,523 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 9 74.1 76.9 77.6 161 346 746 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 45,195 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 10 74.4 77.2 77.9 167 360 776 Coffee Road Downing Avenue to Granite Falls Drive 47,894 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 6811 74.1 76.9 77.6 159 344 740 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 44,616 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 12 74.8 77.6 78.3 178 383 825 Coffee Road Rosedale Highway (CA-58) to Jet Way 52,523 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 13 75.1 77.9 78.6 188 404 870 Coffee Road Jet Way to Brimhall Road 56,900 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 14 75.6 78.4 79.0 201 432 931 Coffee Road Brimhall Road to Westside Parkway EB Ramps 62,948 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 15 74.8 77.6 78.3 178 384 828 Coffee Road Westside Parkway EB Ramps to Truxtun Road 52,772 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 16 75.0 77.8 78.5 183 395 850 Coffee Road Truxtun Road and Stockdale Highway 54,913 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 17 72.5 75.3 75.9 125 268 578 Calloway Drive Noriega Road to Hageman Road 30,821 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 18 72.3 75.1 75.7 121 260 560 Calloway Drive Hageman Road to Meacham Road 29,375 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 19 72.5 75.3 76.0 125 270 582 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 32,835 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 20 73.6 76.4 77.1 149 320 690 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 42,391 55 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 21 66.5 69.3 69.9 50 107 230 Brimhall Road Allen Road to Old Farm Road 10,293 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 22 67.4 70.2 70.8 57 123 264 Brimhall Road Old Farm Road to Jewetta Avenue 12,682 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 23 68.2 71.0 71.7 65 139 300 Brimhall Road Jewetta Avenue to Verdugo Lane 15,319 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 24 68.9 71.7 72.4 72 156 336 Brimhall Road Verdugo Lane to Calloway Drive 18,149 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 25 69.3 72.1 72.8 77 166 358 Brimhall Road Calloway Drive to Harvest Creek Road 19,952 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 4 Soft 50 0.5 44 26 70.0 72.7 73.4 85 182 393 Brimhall Road Harvest Creek Road to Coffee Road 21,750 50 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68

70.5 73.3 73.9 92 197 425 Hageman Road Calloway Drive to Coffee Road 31,411 45 0.0% 96.0% 2.5% 1.5% 75.0% 15.0% 10.0% 6 Soft 50 0.5 68 dBA at 50 feet Distance to CNEL Contour
Traffic Noise Calculator: FHWA 77-108 Riverview Market (LOKH-01.0) 2046 with Phase 1 and Phase 2 Project Traffic Noise Traffic Conditions Output Inputs Auto Inputs
H V A C V a c u u m and Tunnel Dryer Noise Data
ilYORK®
Heating and Air Conditioning

TECHNICAL GUIDE
R-410A

XP SERIES

6.5 THRU 12.5 TON
60 Hertz

6.5 THROUGH 10 TON

12.5 TON
®
528195-YTG-L-1014
Description
ASHRAE 90.1 COMPLIANT
YORK® Predator® units are convertible single packages with a common footprint cabinet and common roof curb for all 6.5 through 12.5 ton models. All units have two compressors with independent refrigeration circuits to provide 2 stages of cooling.

The units were designed for light commercial applications and can be easily installed on a roof curb, slab, or frame.

All Predator® units are self-contained and assembled on rigid full perimeter base rails allowing for 3-way forklift access and overhead rigging. Every unit is completely charged, wired, piped, and tested at the factory to provide a quick and easy field installation.

Predator® units in all tonnage sizes are convertible between side airflow and down airflow, with corresponding economizer if economizer option is desired.

Predator® XP units are available in the following configurations:
heat pump and heat pump with electric heat. Electric heaters are available as factory-installed options or field-installed accessories.

Tested in accordance with:
�® C US

FOR DISTRIBUTION USE ONLY - NOT TO BE USED AT POINT OF RETAIL SALE /E/AO)
me - =====
")
1 DESIGN
SP I
1 CERTIFIC"
1 A
YORK sclmssod
ee
s
AMM CERTIFIED.
wew ahridirectary.org
. 11
Unitary Large HP
AlA Stand 340/360
528195- YTG-L-1014
Physical Data
XP078-150 Physical Data
Models
Component
XP078 XP090 XP102 XP120 XP150

6.5 7.5 8.5 10 12.5
80000 92550 105600 122000 158300
78000 90000 102000 117000 150000

11.5 11.2 11.2 11.2 11.0

75.0 88.0 90 5 102.0 135.0

6.2 / 3.35 7.7/3.35 7.9/3.35 8.6/3.30 13 2/3.2

43.0 51.0 530 58.0 90.0

5.7/2.20 6.4/2.25 6.9 / 2.25 7.8/2.20 13.5/2.05
89 89 89 89 119-7/16
59 59 59 59 59
Height 50-3/4 50-3/4 50-3/4 50-3/4 50-3/4
1080 1090 1137 1135 1403
Scroll Scroll Scroll Scroll Scroll
2 2 2 2 2
50/100 50/100 50/100 50/100 50/100

13.2 4
12 Johnson Controls Unitary Products
14-2
12-10
13-12
13-13
13-0
13-2
12-14
12-12
17-6
17-8
120
12 4
2600

6.78 R-410A
Length
Width

12.0 12 4
3000

8.18 R-410A

11.4 12.4
3750

10.45 R-410A

13.2 4

11.4 12.4
3750
927
R-410A

10.5 119
4900

13.64 R-410A
OPERATING WT. (lbs.)

COMPRESSORS

29.0 2
16 3/8
Split-face
TXV

29.0 2
16 3/8
Split-face

29.0 29.0
2 16
3/8
Split-face
TXV

29.0 2
16 3/8
Split-face

29.0 13.2
4 15
3/8
Split-face
TXV

47.5 2
15 3/8
Split-face
TXV
Gross Capacity @ AHRI A point (Mbh)
AHRI net capacity (Mbh)
EER

13.2 4
15 3/8
Split-face
TXV
13 2
4 15
3/8
Split-face
TXV
15 3/8
Split-face
TXV
IEER____________________________
IPLV
Nominal CFM
System power (KW)
Refrigerant type
Refrigerant charge (ib-oz)
System 1
System 2

AHRI HEATING PERFORMANCE
15 3/8
Split-face
TXV
47°F capacity rating (Mbh)
System power (KW) / COP
17°F capacity rating (Mbh)
System power (KW) / COP
HSPF (Btu/Watts-hr)
DIMENSIONS (inches)
Type
Quantity
Unit Capacity Steps (%)

CONDENSER COIL DATA
Nominal Tonnage

AHRI COOLING PERFORMANCE
Face area (Sq. FL)
Rows
Fins per inch
Tube diameter (in.)
Circuitry Type
Refrigerant control

EVAPORATOR COIL DATA
Face area (Sq. Ft.)
Rows
Fins per inch
Tube diameter
Circuitry Type
Refrigerant control
528195-YTG-L-1014
XP078-150 Physical Data (Continued)
Models
Component
XP078 XP090 XP102 XP120 XP150

6.5 7.5 8.5 10 12.5
2 2 2 2 4
24 24 24 24 24
2 2 2 2 4
1/3 1/3 1/3 1/3 1/3
1 11 1 1
850 850 850 850 850
Nominal total CFM 6800 6800 6800 6800 14000

BELT DRIVE EVAP FAN DATA
1 11 1 1
15 x 15 15x15 15 x 15 15 x 15 15 x 15
Centrifugal Centrifugal Centrifugal Centrifugal Centrifugal VL40 1VL40 1VM50 1VP50 1VP50 1VM50 1VM50 1VM50 1VP56 VL44 Blower Sheave AK84 AK71 AK69 AK69 AK89 AK74 AK84 AK74 AK74 BK77 Belt A54 A52 A52 A54 A56 A54 A56 A54 A54 BX56
Motor HP each 1-1/2 2 1-1/2 3 2 3 2 3 3 5
RPM 1725 1725 1725 1725 1725 1725 1725 1725 1725 1725
Frame size 56 56 56 56 56 56 56 56 56 184T

FILTERS
Quantity - Size
XP078-150 Unit Limitations
Unit Limitations
Model Unit Voltage Applied Voltage
Min Max
208/230-3-60 187 252
XP 460-3-60 432 504 125
575-3-60 540 630 125
208/230-3-60 187 252 125
XP 460-3-60 432 504 125
575-3-60 540 630 125
208/230-3-60 187 252 125
XP 460-3-60 432 504 125
575-3-60 540 630 125
208/230-3-60 187 252 125
XP 460-3-60 432 504 125
575-3-60 540 630 125
208/230-3-60 187 252 125
XP 460-3-60 432 504 125
575-3-60 540 630 125
Johnson Controls Unitary Products 13
Size
(Tons)
150
(12.5)
120
(10)
078
(6.5)
102
(8.5)
090
(7.5)
Prop
Direct
Prop
Direct
Prop
Direct
Prop
Direct
Prop
Direct

1. 2 In. Throwaway, Standard, MERV (Minimum Efficiency Reporting Value) 3.

2. 2 In. Pleated, Optional, MERV 7

3. 4 In. Pleated, Optional, MERV 13.

Quantity of Fans
Fan diameter (Inch)
Type
Drive Type
Quantity of motors
Motor HP each
Quantity
Fan Size (Inch)
Type
Motor Sheave
No. speeds
RPM
4 - (24 x 20 x 2)1 2
4 - (24 x 20 x 4)3
Nominal Tonnage

CONDENSER FAN DATA
4 - (24 x 20 x 2)1 2
4 - (24 x 20 x 2)3
4 - (24 x 20 x 2)1 2
4 - (24 x 20 x 2)3
4 - (24 x 20 x 2)1 2
4 - (24 x 20 x 4)3
4-(24 x 20 x 2)12
4 - (24 x 20 x 4)3
Outdoor DB Temp
Max (°F)
125
528195- YTG-L-1014
Capacity Performance
XP078-150 Cooling Capacities
XP078 (6.5 Ton)
Temperature of Air on Condenser Coil
CFM 1 1 I I 1 1 I I 1 I
90 80 75 70 65 90 80 75 70 65
1625

37.4 374
1950
2275
2600
2925
3250
1625
37 3 325
1950
2275
2600
2925
3250
14 Johnson Controls Unitary Products
402

50.5 54.0
420
408

55.8 55.6

30.8 40.2

48.9 482

35.5 364

37.0 38.0
364

45.5 28.1

38.5 47.9
325

44.9 56 1

57.0 45.8

60.0 61.0

32.7 43.0

43.8 42.7

45.1 35.7

36.3 358

48.1 61 2
622

49.9 65.1

67.1 51.8

69.6 69.4
41 9
41 9

40.0 42.3

45.3 48.0

34.0 34.8

34.4 34.7
373

49.5 59.8
633
336

44.9 570
579

34.0 45.0

35.2 45.3

47.9 62 9
62 2
376
507
51 8

48.9 53.1

41.8 42.9

47.1 48.1
358
479

48.9 45.1

48.9 388
398

32.5 43.1
532

40.9 53.1

55.6 34.6

45.8 46.7

43.7 57.1

59.7 38.3

48.7 49.3

40.1 48.7

49.0 WB (°F)
40 3
41 3

35.5 472
584

60.6 33.5

44.5 537

48.0 60.6

64.7 43.9
562

55.1 52.4

54.3 36.5

48.6 49.6
Sensible Capacity (MBh)
Return Dry Bulb (°F)

38.5 51 3
636

66.0 38.0

49.2 51 4
394
536

54.7 Sensible Capacity (MBh)
Return Dry Bulb (°F)

31.4 41.7

52.7 Total
Capacity1
(MBh)
Total
Capacity1
(MBh)

41.1 54.6
660

69.8 41.2

44.7 30.3

41.7 52.0
528

44.8 59.7

72.2 76.4

47.0 62.6

77.8 79.8

49.1 65.6

83.5 83.2

44.1 556

59.4 41 7

54.9 54.9

47.0 57.9

68.8 81.6

53.0 652

77.4 85.8
83 3

58.9 72.5

86.0 90.0

87.4 64.9

79.7 94.5

94.2 91.5

85.1 102.9

97.1 94.2

90.6 111.3

99.9 97.0
38 1
51 2

65.4 66.5

40.6 54.7
679
679

43.0 58.1
705

69.3 34.7

48.1 602
61 2

36.9 51 3
61 6
62 3

39.0 54.4
630
633
107.3

99.2 91 1

81.6 112 8
104.3
957

85.8 83.3
118 3
109.4
100.4

90.0 87.4
123.8
114.4
105.1

94.2 91.5
117.9
108.2

97.1 94.2
121.3
111.3

99.9 97.0

99.2 90.3

81.5 75.1
102.7

93.5 84.4
778
767
106.2

96.8 873

80.4 79.3
109.8
100.0

90.2 831

82.0 100.9
91 1

83.9 82.7
101.9

91.9 84.7

83.5 30.7

41.7 52.6
61 8

34.4 46.6

58.8 691
726

38.0 51.5
65 1

76.5 80.3

41.6 56.5

71.3 83.8

88.0 59.7

75.4 90.5

92.5 62.9

79.5 97.3

97.0 6.2
6 '

6.1 6.1

6.2 62
6 1

6.1 6 1
62 62

6.1 6 1
6 1

6.2 62

6.1 6 1
6 1
6 1
6 1

6.1 6 1
6 1
6 1
60 60

5.5 5.4

5.4 5.3

5.5 5.5

5.4 5.4

5.4 5.5

5.5 5.5

5.4 5.4

5.6 5.5

5.5 5.4

5.4 5.5

5.5 5.4

5.4 5.5

5.5 5.4

5.4 44.1

54.5 64.8
75 1

49.6 60.8
72 1
77 8
76 7

55.0 67.2

79.4 80.4

79.3 60.4

73.5 867

83.1 82 0

79.6 89.3

83.9 82 7

85.7 91.9
84 7

83.5 45.6

56.2 66 8

78.4 51 3

63.0 74.7
81 8
800
56 9

69.8 82.7

85.2 83.4

62.6 76.6

90.6 88.7

86.7 82.4
96 1

90.5 88 5

88.1 101.6

92.3 90.2

28.8 39.1

49.4 60.4

31.4 42.7

53.9 66.0
670

34.1 46.3

58.5 71 6

72.7 36.7

49.9 631

77.2 784
536

67.7 80.9

80.9 572

72.3 84.7
835

92.8 84.1

75.4 69 4
957
868
778
71 6

71.9 98.7
894
802
738

74.1 101.6
92 1
826
760
763

92.9 833
766
770

93.7 840
773
777
| 85
85= F

37.7 48.3
58 9
708
42 1
538
656
76 8
790

46.5 59.4

72.2 82.7

82.9 50.9

64.9 78.9

88.7 86.7

69.5 84.4

90.5 88.5

74.1 89.9

92.3 90.2
105=F

33.2 43.5

53.9 67.0

37.0 48.3

59.7 70.0

70.8 40.8
53 1
65 5
730
735

44.6 579

71.3 760
76 3
62 8
76 3
766
770
67 6

81.4 77.3

77.7 25.5

35.8 46.2
556

28.0 39.3

50.7 610

61.8 30.5

42.8 552

66.4 67 3

33.0 46.3
597

71.8 728

49.8 64.2

74.6 752

53.3 68.7
773
777
103.2

94.7 863

78.4 1077

98.9 90.1
81 8
800
112.3
103 1
939

85.2 83.4
116.8
107.2

97.6 88.7

86.7 109.4
996
90 5
885
111.6
101.6

92.3 90.2
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57

7.0 7.0

7.0 6.9

7.0 7.0

7.0 69
69 7.0
70 7.0
69 69

7.0 7.0

7.0 69
69 7.0
69 69
69 6.9
69 69
69 29.7

40.4 51 0
61 1

32.9 44.6

56.4 676
698

36.0 48.9
61 8

74.0 76.5

39.2 53.2

67.2 80.5

83.2 56.6

71.5 85.7

86.7 60.1

75.9 91.0

90.2 39 9

51.2 62.6

69.4 46 0
57 3

68.7 71 6
71 9

52.1 63.4

74.8 738

74.1 58.2
69 5

80.8 76 0
76 3
757

82.4 766
770
81 9

84.0 77 3
777

4.8 4.7

4.7 4.6

4.8 4.8

4.7 4.7

4.6 4.9

4.8 4.8

4.7 4.7

4.9 4.9

4.8 4.8

4.7 4.9

4.8 4.8

4.7 4.9

4.9 4.8

4.8 85
75°F

38.9 49.8
607
705

43.7 559
681
784
81 9

48.5 62.0

75.5 86.3

86.7 53.3

68.1 82.9

94.2 91.5

72.4 88.1

97.1 94.2

76.7 93.3

99.9 97.0
95°F

36.5 46.8

57.1 71.1

40.5 51.7
630
751
761

44.5 567

68.9 79.1

79.0 48.6

61.7 74.9
831
820

66.6 807
839

82.7 71.4

86.5 84.7

83.5 41.5

55.5 68.8
71 4

43.8 58.7

72.9 73.8

46.1 61.9

77.0 76.2
Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195-YTG-L-1014
XP078 (6.5 Ton) (Continued)
Temperature of Air on Condenser Coil
CFM I I I I I I i i i
90 80 75 70 65 90 80 75 70 65
1625

27.6 22.7
1950
2275
2600
2925
3250
Johnson Controls Unitary Products 15

29.2 29.8

29.5 30.8
233

25.3 27.6

35.3 244

30.4 26.5

33.2 33.6
243

24.7 24.9

35.3 43.0

30.7 388

39.3 27.6

28.1 29.6
38 1
387

33.6 43.7

44.4 35.0

42.4 43.7

26.7 28.6

23.8 35.3
420

42.5 26.0

26.4 19.1
225
31 6

40.9 41.5

32.3 33.0

25.9 38.6

46.0 46.4

32.5 336

37.0 27.1

38.5 470
476

36.3 41.1

43.0 30.7
31 4

21.7 32.1

38.1 28.6

36.0 364
31 6
362

38.1 Total
Capacity1
(MBh)
292
41 7
51 0
51 7
Total
Capacity1
(MBh)
WB
(°F)
Sensible Capacity (MBh)
Return Dry Bulb (°F)

28.0 41 8

49.9 50.4

29.5 44.4

49.0 51.0

31.0 47.0

48.1 51.5
Sensible Capacity (MBh)
Return Dry Bulb (°F)

19.0 29.4

39.8 45.8

21.1 32.6

44.2 509
51 3
232
359
486

56.0 56.5

25.4 39.2

53.0 61 1

61.6 42.4

57.3 61.8

63.8 45.5

61.5 62.6

66.0 86.5

77.9 69.4

63.7 88.8

80.0 71.2

65.4 67.1
91 1
82 1
731
67 1

68.9 93.4

84.2 74.9

68.8 70.6

84.9 75.6

69.4 71.2

85.6 76.2

69.9 71.8
31 4

45.0 55.1

55.8 33.2

47.8 55.3

56.6 35.0

50.7 55.5

57.4 35.6

48.0 60.5

63.7 42.4

53.8 65.3

65.4 67 1

49.3 59.7
70 1
67 1

68.9 56.1

65.5 74.9

68.8 70.6

71.9 75.6

69.4 71.2

78.2 76.2

69.9 71.8

8.7 8.6

8.6 8.6

8.7 8.6

8.6 86
85 8.6

8.6 8.6
86 85

8.6 8.6

8.6 8.6

8.5 8.6

8.6 8.6

8.5 8.6

8.6 8.6

8.5 30.4

44.8 58.3

58.0 38.8

50.4 61.9

59.2 62.4

47.3 55.9
65 5

60.4 637
55 7

61.5 67 3

61.6 65.0

68.0 67.8
62 1

65.5 74.5

68.3 626

66.0 | 85
125=F

26.7 37.1

47.5 58.0

30.0 41.5

53.0 592
602

33.3 45.9

58.6 60.4
626

36.5 50.3
64 1

61.6 65.0

55.2 67.6

62.1 65.5

60.0 68.3

62.6 66.0

22.2 32.6

43.0 50.7

24.6 36.0

47.4 55.9

56.5 269

39.4 51 9

61.2 61 9

29.2 42.8

56.3 66.5

67.2 46.1

60.7 68.2

69.5 49.4

65.1 69.9

71.8 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57

7.8 7.8

7.8 7.8

7.8 7.8

7.8 78
77 7.8
78 7.8
78 77

7.8 7.8

7.8 7.8

7.7 7.8

7.8 7.8

7.7 7.8

7.8 7.8

7.7 | 85
115°F

29.9 40.3

50.7 62.9

33.5 44.9

56.4 64.9

65.5 37.0

49.5 62.0
668
681

40.5 54.1
677

68.8 70.6

59.0 72.0

69.4 71.2

63.8 76.2

69.9 71.8

1. These capacities are gross ratings. For net capacity, deduct air blower motor, MBh = 3 415 x kW Refer to the appropriate Blower Performance Table for the kW of the supply air blower motor.

2. These ratings include the condenser fan motors (total 1 kW) and the compressor motors but not the supply air blower motor.

Air on
Evaporator Coil

80.1 71.7

63.3 58.0

81.8 73.2

64.6 592
624

83.5 747

65.9 604
637

85.2 762

67.3 61.6

65.0 76.8

67.8 62.1

65.5 77.4

68.3 626
660
Total
Input
(kW)2
Total
Input
(kW)2
528195- YTG-L-1014
XP090 (7.5 Ton)
Temperature of AT on Condenser Coil
CFM I I 1 I I i i i i 90 80 75 70 65 90 80 75 70 65
1875

48.9 45.4
2250
2625
3000
3375
3750
1875

41.9 37.9
2250
2625
3000
3375
3750
16 Johnson Controls Unitary Products

34.8 45.9

32.0 45.8

58.4 47.9
51 1

42.9 57.5

37.5 50.1

29.0 429

54.0 50.3

53.8 527

56.5 48 1

65.2 696

39.9 53.6

56.0 567

61.5 605

60.9 45.2

45.0 39.6

56.0 72.0

75.5 34.6

48.6 622

42.5 59.2

76.3 80.7

34.4 49.3

63.0 65.4

55.9 78.2

74.3 44.6
60 5
63 3

48.7 51.5
470

48.2 31 2

46.3 584
599
334

49.8 62.9

64.5 502

66.7 67.5
537

54.6 367

52.8 67.6

70.2 50 7

69.1 73.8

42.2 570
596
642
603

54.1 58.6

40.2 53.8
427

57.5 60.7

52.8 68.6

66.5 54.7

52.6 42.2
43 7
39 1
38 7

47.2 597

61.0 497
590
58 7

51.5 556

46.4 52 5

52.1 39.8

55.3 71 2

75.3 45.5

61.4 65.4

53.3 73.6

74.1 39.4

52.5 54.1

44.1 54.2

54.8 44 3

46.0 37.2

51.5 66.1

37.1 523

67.1 70.3

37.1 492

50.7 40.0

41.5 WB
(“F)

46.5 49.0
Sensible Capacity (MBh)
Return Dry Bulb (DF)
Sensible Capacity (MBh)
Return Dry Bulb (°F)

44.2 46.6
Total
Capacity1
(MBh)
452

61.1 64.6
477
648

68.5 41.7
42 3
Total
Capacity1
(MBh)

31.5 45.7

60.0 746

34.1 496

65.1 81.0

85.1 368

53.5 70.2

87.3 91.8
39 5

57.4 75.4

93.7 984
607
796
999
100.4
640
839
106.2
102.3

41.7 55.8

57.5 26 5
40 3
540
666
288
438
587
724
748

31.1 47.3

63.4 782

80.8 33.4

50.8 68.1
840
868
542
727

85.3 86.5

57.6 77.3
86 5

86.3 6.5

6.5 6.4

6.3 6.5

6.5 64

6.3 6.3

6.6 6.5

6.4 6.4

6.4 6.6

6.5 6.4

6.4 6.4

6.5 6.5

6.4 6.4

6.5 6.5

6.4 6.4

42.1 59.7
768

80.6 44.5
632
796

80.5 46.9

66.7 825
804

45.1 63.0

81.4 86.1

47.6 66.5

86.8 87.2

50.0 69.9

92.2 88.3

48.6 629
T12
937

53.8 69.3

84.8 97.0
934
590

75.7 924
100 3

96.6 64.1
82 1
100.0
103.7
998
870
106.1
104.9
101.1
91 9
112.3
106.2
102.3

8.2 8 '

8.1 8.0

8.2 3 2
8 '

8.0 8.0

8.3 82

8.1 8.1

8.1 8.3
82 8.1

8.1 8.1

8.2 82

8.1 8.1

8.3 82

8.1 8.1

35.6 53.3

67.4 69.1

37.7 56.5

66.7 67.3

39.8 59.8

65.9 65.6
116.6
107.8

99.0 93.7
120.7
111.7
102 6

97.0 93.4
124.9
115 5
106 1
1003

96.6 129 1
119 4
109 6
103.7

99.8 120.8
111.0
104.9
101.1
122.3
112.3
106.2
102.3
103.4

95.0 86.6

79.0 106.3

97.7 89.0

81.3 81.1
109.3
100.4
91 5

83.6 83.4
112.2
103 1

94.0 85.8

85.6 103.5

94.4 862

86.0 104.0

94.8 86.5

86.3 39.0

56.3 722

75.0 41.4

59.9 72.5

73.8 43.8

63.5 72.8

72.5 7.3

7.2 7.2

7.1 73

7.3 72

7.1 7.1

7.4 7.3

7.2 7.1

7.1 7.4

7.3 7.2

7.2 7.2

7.3 7.3

7.2 7.2

7.3 7.3

7.2 7.2
110.0
101.4

92.8 86.4
113.5
104.7

95.8 892
872
117.1
108 0

98.8 92.0

90.0 120 7
111.2
101.8

94.8 927
112.2
102.7

95.6 93.5
113.1
103.5

96.4 94 3
232
370

50.9 62.0

25.3 404
555
676

69.1 274

43.8 60.2

73.3 748

29.5 47.1

64.8 78.9

80.6 502

69.0 79.1

79.8 53.3

73.2 794

79.0 29.0

43.0 57.0

70.6 31.5

46.7 61.9

76.7 80.0

34.0 504

66.8 82.8

86.3 36.5

54.1 71.7
888
926
574
762

92.6 934
608

80.6 96.4

94.3 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57

45.8 59.8

73.8 86.4

50.7 65.9

81.2 89.2

87.2 55 6
72 1
88 5

92.0 90.0
60 5

78.2 95.8

94.8 92.7

83.4 99.7
956

93.5 88.6
103.5

96.4 94.3

43.0 568
705
790

47.7 626
776
81 3

81.1 523
684

84.6 836
834

56.9 74.3
91 6

85.8 85.6
797
932
862

86.0 85.2

94.8 86.5

86.3 95.4

87.7 79.9

74.0 976

89.7 81.8

75.7 75.4

99.9 91 8
837
775

77.1 102 1

93.8 856
792
788

93.9 856

79.3 78.9

94.0 857

79.4 79.0
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 | 85
85= F

37.4 51.4
654

82.1 41.1

56.3 71 5

86.3 872

44.8 61 2
777

90.5 90.0

48.5 66 1

83.8 94.8
927

70.4 89.1

95.6 935

74.7 94.5

96.4 94.3
105°F

31.2 45.1

58.9 74.0

34.5 49.6

64.7 75.7

75.4 37.7

54.1 70.5
775

77.1 41.0

58.7 763
792
788
627

80.1 793
789

66.7 83.9
794

79.0 5.8

5.7 5.6

5.5 58

5.7 5.6

5.6 5.6

5.8 5.7

5.6 5.6

5.6 5.8

5.7 5.6

5.6 5.6
57 5.7

5.6 5.6
57 57

5.6 5.6
37 5

53.1 68.7

74.0 43.7

58.8 73.9

75.7 75.4

49.8 64 5
792
775
77 1
56 0

70.2 84.4
792
788
752
85 1
793

78.9 80 1

85.7 79.4
790
85 75°F

40.0 54.3
686
852

44.0 59.5

75.0 91 3

93.4 479

64.6 81 3
975

96.6 51 8
697
877
103 7
998

73.9 928
1049
101 1
780
979
1062
1023
95°F

34.8 48.5
623
790
382
532
68 1
81 3
81 1
41 7
579

74.0 836
834
452

62.5 799
858
856

67.0 85.5
862
860
71 4

91.1 86.5

86.3 Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195-YTG-L-1014
XP090 (7.5 Ton) (Continued)
Temperature of Air on Condenser Coil
CFM I I I 1 I I I i i 90 80 75 70 65 90 80 75 70 65
1875

33.9 29.9
2250
2625
3000
3375
3750
Johnson Controls Unitary Products 17

26.0 40.0

49.6 366
48 1
486

43.0 46.0
45 5

29.5 37.5
31 2

30.6 26.9
262
389

51.2 51.8

33.8 43.6

43.0 36.0
466

46.0 31.8

31.3 35.5

34.9 41.0

48.6 48.7

39.9 40 5

23.0 37.1

45.1 26.8

43.8 53.5

53.0 33.0
32 5

33.6 33.1

28.1 43.4

53.9 54.4

30.1 46.8

58.2 58.7

34.4 44.9

45.4 36.4
365

31.7 40.6

40.1 379

43.1 425

24.9 40.4

49.3 48.8

39.7 39.6

38.9 32.2

41.7 379

38.4 35.9

36.4 Total
Capacity1
(MBh)
Total
Capacity1
(MBh)
WB
(°F)
32 2
502

62.5 63.1

34.0 53.1

60.8 60.8

35.9 56.1

59.1 58.6
Sensible Capacity (MBh)
Return Dry Bulb (DF)

9.1 9.1

9.0 8.9

9.2 9.1

9.0 9.0

9.0 9.2

9.1 9.0

9.0 9.0

9.2 9.1

9.1 9.0

9.0 9.2

9.1 9.0
90 9.2

9.1 9.1

9.0 87.4

80.3 73.3

68.9 89.0

81.7 74.5
701

69.6 90.5

83.2 758

71.3 708

92.0 84.6

77.1 72.5

72.0 84.3

76.9 72.4

71.8 84.1

76.7 72.2

71.7 Sensible Capacity (MBh)
Return Dry Bulb (°F)

79.5 73.0

66.6 63.9

80.3 73.8

67.3 64.5

63.9 81.1

74.5 68.0

65.2 64.6

81.9 75.3

68.7 65.9

65.2 74.8

68.2 65.4
648

74.2 67.7
650

64.3 10.1

10.0 9.9

9.9 10.1

10.0 9.9

9.9 9.9
10 1
10 0

9.9 9.9

9.9 10 1
101

10.0 9.9

9.9 10.1

10.0 10.0

10.0 10.1

10.0 10.0

10.0 16.5

30.6 44.7

52.7 18.1

33.7 49.2

58.1 57.6
198

36.8 53.7
634

62.9 21 5
399
582
659
652

42.2 61 6
654

64.8 44.6

65.1 65.0

64.3 32.0

49.4 66.9
689

39.7 55.0

70.3 70.1

69.6 47.4

60.6 73.7

71.3 708

55.1 66.1

77.1 72.5
720

70.6 769
724

71.8 75.1
767
722
71 7

25.8 45.8

65.4 63.9

35.7 51.2

66.7 64.5

63.9 45 5
566
68 0

65.2 646
554

62.0 68.7
65 9

65.2 66.0

68.2 65.4

64.8 70.0
67 7

65.0 64.3

28.8 47.1

57.6 57.1
303

49.8 550
544

31.9 524
523

51.6 19.8

33.8 47.8
574

21.7 370
524
629

63.3 236

40.3 56.9

68.3 68.9
25 5
43 5

61.5 73.8
744

46.2 65.3

73.0 73.0

48.9 692
722

71.7 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57
| 85
115
:F

27.6 41.6
556
689

30.7 460
61 3

70.1 696
337

50.4 67.1

71.3 708

36.8 54.8
728
725
720

58.4 748
724
71 8
620
767

72.2 71.7
| 85
125=F

23.8 38.2

52.3 63.9

26.9 42.4

57.9 64.5
639
30 1

46.7 636
652

64.6 332

50.9 687

65.9 65.2

54.1 68.2

65.4 64.8

57.3 67.7

65.0 64.3

1. These capacities are gross ratings. For net capacity, deduct air blower motor, MBh = 3.415 x kW. Refer to the appropriate Blower Performance Table for the kW of the supply air blower motor.

2. These ratings include the condenser fan motors (total 1 kW) and the compressor motors but not the supply air blower motor.

Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195- YTG-L-1014
XP102 (8.5 Ton)
Temperature of Air on Condenser Coil
CFM I I I i i i i i i 90 80 75 70 65 90 80 75 70 65
2125

50.2 45.9
2550
2975
3400
3825
4250
2125

41.5 38.3
2550
2975
3400
3825
4250
18 Johnson Controls Unitary Products
50 3

49.9 56.1

66.1 66.1
58 3

60.6 48.6

66.1 835

85.8 45.6

59.9 62.4

64.9 43.5

42.1 57.3

58.1 49 5
654
67 5

50.8 670

66.1 40.8

55.3 69.6
575

76.4 78.9

62.7 82.1

81.4 53.4

66.5 66.1

48.6 47.8
323

46.4 58.5

42.5 55.7

53.5 542

48.4 48.5

52.2 51 3

45.2 632
793

80.0 39.4

57.0 72 1

67.9 47.2

63.8 592

40.0 535

49.8 52.2

56.5 58.2

41.8 38.1
497

50.3 39.5

51.5 45.1

44.4 54.3

56.3 50.3
664

67.1 43.6

58.7 54.5

56.8 72 9

73.1 48.7

44.1 56.8

56.5 53.5
709
732

60.1 79.2

80.1 37.7
524

65.6 36.3
484

45.2 41.1
384

40.1 57.1

57.3 65.2

64.5 41.5

57.8 724

73.1 46.4

61.0 61.7
WB (°F)
41 9
602
750

74.3 470
61 8

61.0 49.7
60 1

58.7 63.8

64.7 Sensible Capacity (MBh)
Return Dry Bulb (°F)

59.4 74.1

73.7 54.1

71.7 725

34.7 49.5

61.6 38.3

54.9 68.3

67.6 359

51.7 65.3

61.6 Sensible Capacity (MBh)
Return Dry Bulb (°F)

43.3 56.7

56.0 Total
Capacity1
(MBh)
Total
Capacity1
(MBh)

44.7 60.7
765
786

45.5 65.6
81 8
809

48.2 69.7
82 8
82 3

50.9 738
838
838

43.0 62.3
789
743

45.6 66.3

76.7 753

48.2 703

74.6 763
525
71 5

90.4 92.9

55.3 75.5

94.7 95.5

58.1 79.5

98.9 98.2
118.6
109.4
100.2

92.3 123.3
113.7
104.2

96.0 95.7
128.0
118 1
108 1
996

99.3 132 7
1224
112.1
103.3
103.0
1255
115.0
105 9
105 6
128.6
117.8
108.6
108 2
116.2
105.1

94.0 87.9
120.4
108.9

97.4 91.1

91.1 124.5
112.6
100.7

94.2 94.2
128 7
116.4
104.1

97.4 97.4
118.8
106.3

99.4 99.4
121.3
108.4
101 4
101.4

36.0 50.5

65.0 79.3

39.8 55.8

71.8 877
897

43.6 61 2
787
961
983

47.5 66.5
856
104.5
106.9

70.7 91.0
110.1
111.0

74.9 96.4
115.7
115.0

6.2 6.1

6.0 5.9

6.2 6.1

6.0 60
59 6.2
6 1
60 60
60 62
6 1

6.0 6.0

6.0 6.2

6.1 6.0

6.0 6.3

6.2 6.1

6.1 | 85
85=F

42.8 57.4

72.1 91.1

47.9 64.2

80.5 952

95.7 531
71 0

89.0 992

99.3 58.3
77 8

97.4 103.3
103.0

83.4 104.3
105.9
105.6

89.0 1111
108.6
108.2
105°F

37.9 52.5

67.1 80.7

43.5 59.4

75.2 83.5

85.0 49.2

66.3 83.4

86.4 87 9

54.8 732

91.5 892

90.9 78 8

95.6 90.9
926

84.4 99.7
926

94.4 29.8

44.7 59.6

71.6 33.3

49.9 66.5

79.9 79.2

36.8 55 1

73.4 882
87 5

40.2 603

80.4 96.6
957

64.4 85.9

99.0 98.6

68.6 91 4
101 4
101.4

8.9 8.8

8.8 8.7

8.9 8.9

8.8 8.7

8.8 9.0

8.9 8.9
88 88

9.0 9.0

8.9 88
88 9.0

8.9 88
88 9.0

8.9 89
89 107.5

97.2 86.8

80.7 111.4
100.6

89.9 83.5

85.1 115.2
1040
92 9

86.4 880
119.0
1075

96.0 892
909
109.5
978
909
926
1116
997
926
944

32.9 47.6

62.3 75.4

36.6 529

69.2 83.8

84.5 40.2

58.1 76 1

92.2 92.9

43.8 634

83.0 100.5
101.3

67.6 884
104.5
104.8

71.8 93.9
108.6
108.2

49.0 68.5

86.1 86.9

51.8 726

88.7 88.9

54.5 76.7

91.3 91.0

58.3 69.9

81.4 96.7

62.1 78.1

94.1 100.9
100.3

65.9 86.3
106.8
1051
104.4

69.7 94.6
119.5
109.3
108.6
101.6
123.3
112.5
111.8
108.6
127.2
115.7
115.0

28.3 42 4

56.5 68.6

31.8 47.6

63.5 77.0

73.3 35.3

52.9 70.4

85.5 81.4

38.8 58.1

77.4 93.9

89.4 622
82 9

93.3 91.9

66.3 88.4

92.6 94.4
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 52.6

67.3 82.0

92.3 59.3

75.6 91.9

96.0 95.7
66 0
83 9
101.8

99.6 99.3

72.7 92.2
111.8
103.3
103.0

99.2 114.8
105.9
105.6
106.2
117.8
108.6
108.2
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 120.9
113.7
106.4

96.7 126.2
118.6
110.9
100.9
100.3
131.4
1235
115.5
105.1
104.4
136.7
128.4
120.1
109.3
108.6
132.2
123.6
112.5
111.8
136.0
127.2
115.7
115.0

46.9 64.7

82.5 87.9

56.5 73.1

89.7 91.1

91.1 66.1

81.5 96.9

94.2 94.2

75.7 89.9
104.1

97.4 97.4

96.9 106.3

99.4 99.4
103.9
108.4
101.4
101.4
85 75°F

45.7 60.2

74.6 94.3

51.0 67.0

83.0 99.3
1005

56.2 73.7
91 3
104.3
104.6

61.5 80.5

99.6 109.3
108.6

86.1 106.7
112.5
111.8

91.8 113.8
115.7
115.0
95°F

39.8 54.7

69.6 87.9

44.9 61.5
781
91 1

90.8 50.0

68.3 86.6
942
941

55.0 75 1

95.2 97.4

97.4 80.7
101 8

99.4 99.4
862
108.4
101.4
101.4

44.1 62.6
81 1

80.7 56.2

71.1 86 0

83.5 85.1
68 4
797

91.0 86.4
88 0
80 5
88 3

96.0 89.2

90.9 95.4
97 8
909

92.6 102.5

99.7 926

94.4 7.0

6.9 6.9

6.8 7.0

7.0 6.9

6.8 6.8

7.0 7.0
69 69
69 7.1

7.0 7.0

6.9 6.9

7.1 7.0

6.9 6.9

7.1 7.0

7.0 7.0

7.8 7.8

7.8 7.7

7.8 7.8

7.8 7.7

7.7 7.9

7.9 7.8
77 77

7.9 7.9

7.9 7.8

7.8 7.9

7.9 7.8

7.8 7.9

7.9 7.8

7.8 Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195-YTG-L-1014
XP102 (8.5 Ton) (Continued)
Temperature of Air on Condenser Coil
CFM I I I I I I i i i
90 80 75 70 65 90 80 75 70 65
2125

35.2 32.0
2550
2975
3400
3825
4250
Johnson Controls Unitary Products 19

33.2 45.3

28.3 31.8
402

55.5 48.0

27.6 40.2

52.3 35.2

25.5 183
234

30.0 42.2

36.8 52.3

41.5 30.0

26.6 46.0

53.7 51.3

48.3 46.8

50.3 45.2

37.0 42.3
473

43.9 38.5

27.7 30.0

43.3 55.4
437

60.6 52.3
370
538

69.1 61 6

31.1 45.4
592

49.6 334

47.2 37.6

40.2 574

45.5 38 5
31 8

36.8 34.4

41.7 298

33.5 48.6
62 3

55.6 Total
Capacity1
(MBh)

36.7 50.4
437
Total
Capacity1
(MBh)

34.6 50.6

66.1 553

41.8 34.4
WB
(°F)

44.4 37.2

42.4 41.2

60.4 79.6

73.4 55.9

69.1 82.4
760
79 1
70 7

77.9 85.1

78.5 81.8

85.4 866

87.9 81.1

84.4 93.9

89.4 82.5

85.9 101.1

90.9 83.9

87.3 Sensible Capacity (MBh)
Return Dry Bulb (°F)
Sensible Capacity (MBh)
Return Dry Bulb (°F)

38.0 55.8

73.0 61.1

40.5 59.6

64.6 61.2

42.9 63.4

56.2 61.3

98.9 89.2

79.6 73.4
102.3

92.4 82.4
760
791
105.8

95.5 85.1

78.5 81 8
109.2

98.6 87.9

81.1 84.4
100.3

89.4 82.5

85.9 101.9

90.9 83.9

87.3 40.5
59 1

75.9 67.7

43.0 63.0

70.7 68.3

45.6 66.8

65.4 68.8

90.2 81.3

72.4 66.2

93.3 84.1

74.9 685

73.1 964
86 9
773

70.7 75.6

99.5 897
798

73.0 78.0
910

81.0 74.0
791
92 3

82.1 751
80 3

25.3 37.8

50.4 66.2

28.8 43.1
574
685
61 6
32 3

48.4 64.5
707
692

35.9 53.7

71.5 73.0

76.8 57.8

76.9 74.0

78.5 61.8

82.1 75.1

80.3 26.8

40.1 53.4

65.6 30.3

45.4 60.5
741
675
338

50.6 67 5
827
753

37.3 55.9

74.5 91 3

83.1 60.0

79.9 87.6

85.2 64.1

85.4 83.9

87.3 | 85
125=F

31.8 48.0

62.0 66.2

40.8 55.1

69.4 68 5

73.1 49.9
622
76 9
707
756

58.9 69.4

79.8 73.0

78.0 75.1

81.0 74.0

79.1 80.8

82.1 75.1

80.3 44.1

58.2 72.4

66.2 59.4

67.2 74.9
68 5

73.1 74 8
76 1
77 3

70.7 756

90.2 85.0

79.8 73.0

78.0 91.0

81.0 74.0
79 1

92.3 82 1

75.1 80.3

10.0 9.9

9.8 9.7

10.0 9.9

9.8 9.8

9.8 10 1
100
99 9.8

9.8 10 1
100

9.9 9.8

9.9 10.0

9.9 9.9

9.9 10.1

10.0 9.9

9.9 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57
| 85
115°F

36.0 50.3

64.5 73.4

42.2 57.3

72.3 760
791

48.4 64.3
801
785
81 8

54.6 71.3

87.9 81 1

84.4 76.9

89.4 82.5

85.9 82.6

90.9 83.9

87.3 11.1

11.0 10.9

10.8 11.1

11.0 10.9

10.8 10.8

11.2 11.0

10.9 10.8

10.9 112
111

10.9 10.9

10.9 11.1

11.0 10.9

10.9 11.1

11.0 10.9

11.0 1. These capacities are gross ratings. For net capacity, deduct air blower motor, MBh = 3.415 x kW. Refer to the appropriate Blower Performance Table for the kW of the supply air blower motor.

2. These ratings include the condenser fan motors (total 1 kW) and the compressor motors but not the supply air blower motor.

Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195- YTG-L-1014
XP120(10 Ton)
Temperature of Air on Condenser Coil
CFM 1 I I i i i i i i 90 80 75 70 65 90 80 75 70 65
2500

58.5 60.4
3000
3500
4000
4500
5000
2500

62.3 52.6
3000
3500
4000
4500
5000
20 Johnson Controls Unitary Products

66.9 67.6

55.8 80.5

98.1 101 6
59 5
60 3

62.8 606
552
592

60.5 81.0

81.6 69.8
833

86.4 48.9
659

63.8 68.3
702

53.3 75.3
732
63 3
61 0

43.5 61 4

78.4 764
504

68.6 664

55.7 67.8

69.1 57.2
762

76.7 702
709

50.5 51.8

46.7 63.0

83.7 55.4

69.7 668

84.4 878

73.5 92.5

95.5 52.2

73.0 64.6
678

77.6 79.9

63.7 64.2
664

69.6 74.5

93.2 95.5
60 1
767
775

76.7 80.4

53.1 74.6

95.1 95.7

54.7 524

48.5 65.8

87.9 858

51.0 735

89.5 92 7

49.7 69.7

88.7 892
474
632

59.5 64.4

69.2 46.3

51.1 533

51.3 639
859

86.5 66.8

84.6 86.5

53.8 71.3

54.0 51.9
WB (°F)

50.3 687
92 1

89.9 46.1

66.6 80.8
725

91.7 95.4

46.4 64.8

82.3 45.6

64.9 83.1

80.9 41.3

57.9 73.7
61 1
770
803
650
733
77 4
638
61 4
Total
Capacity1
(MBh)
706

74.1 Total
Capacity1
(MBh)
Sensible Capacity (MBh)
Return Dry Bulb (°F)
Sensible Capacity (MBh)
Return Dry Bulb (°F)

77.2 80.2
51 8

71.3 68.9

59.2 79.6
100.1
121.6

65.7 88.3
110.9
124.9
127.2

72.3 97.0
121 7
128.2
130.6

78.9 105.7
132.5
131.6
134.0
107.3
133.0
128.0
130.4
109.0
133.5
124.4
126.7

54.3 777

75.4 10.6
104

10.2 10.1

10.6 104

10.2 10.1

10.2 10.6
104

10.2 10.1

10.2 10.6

10.4 10.2

10.2 10.2

10.5 10.3

10.2 10.2

10.5 10.3

10.2 10.2

38.9 57.3

75.7 93.2

42.3 622
822
101 2
101 8

45.6 67.2

88.7 1092
109.8

49.0 72.1

95.2 117.2
117.8

75.2 99.3
117.1
119.0

78.4 103.5
117.0
120.2

9.3 9.1

8.9 8.9

9.4 9.2

9.0 8.9
89 9.4
92 90
89 89

9.4 92
90 90
89 93
90 90
89 93
9 1
90 90
564

79.5 101 5
102 2

59.0 83.1
100.8
102 8

61.5 86.6
100.2
103.3

47.7 68.4
878

85.5 51.0

73.0 852
864

54.4 776
826
874
119.6
112.1
104.5

97.9 122.6
114.9
107.1
100.3
105 1
125 6
117.7
109.7
102 8
107.7
1286
120 5
112.4
105 2
110 2
117.9
110 0
103 0
107 9
115 3
107 5
1007
105 5
53 1

73.0 92.9

97.9 63.1
81 1

99.0 100.3
105.1

73.2 89.2
105.2
102.8
107 7
83 3
97 3
111 4
105.2
110 2
103.1
109.5
103.0
107.9
108.8
107.5
100.7
105.5
143.9
137.2
130.5
121.6
147.9
141.0
134.1
124.9
127.2
151.8
144.7
137.7
128.2
130.6
155.8
148 5
141.3
131.6
134.0
144.4
137.4
128.0
130.4
140.3
133.5
124.4
126.7
130.2
121.9
113.6
106.1
133.6
125.1
116.5
108.8
112.8
137.0
128.2
119.4
111 6
115.7
1404
131.4
122.4
114.3
118.5
128.7
119.9
112.0
1161
126.1
117.4
109.7
113.7

55.3 800
777

62.5 78.8

95.1 106.1

68.9 86.2
103.6
108.8
112.8

75.2 93.6
112.0
111 6
115 7

81.6 101 0
120.5
114.3
1185
108.2
118.9
112.0
1161
115.3
117 4
109.7
113.7
522
71 6

96.3 94.0

56.5 774
939

94.8 60.8
832

91.5 95.6

41.1 57.4

73.7 94.4

43.7 61 1

78.4 100.5

98.4 46.4

64.8 831
106.6
104.3
49 0

68.4 879
112.6
110 3
737

94.6 1112
112 0

78.9 101 3
109.7
1137
607
875
106.7
110.4

61.5 88.8
107.8
110.7

62.3 90.1
108.8
111.1

8.3 8.1

7.9 7.9

8.3 8.1

7.9 79
78 8.3

8.1 7.9
79 78

8.3 8.1

8.0 7.9

7.9 8.2

8.0 8.0

7.9 8.3

8.1 8.0

8.0 60.8

79.2 97.6
113.8

67.3 87.3
107 2
116 9
120.0
73 8

95.3 1169
119.9
123.2

80.3 103.4
126 5
123.0
126.3
107.8
126.0
120.0
123.3
112.1
125.5
117.0
120.2
| 85
85=F

49.9 68.3

86.7 109.1

54.8 74.8

94.7 113 7
114 3

59.7 81 2
102 8
118 3
120.3

64.6 87.7
110.8
123.0
126.3

91.5 115.6
120.0
123.3

95.3 120.4
117.0
120.2
105°F

45.8 62.4

79.0 97.9

50.6 68.5

86.5 100.3
101 5

55.4 74.7

94.0 102 8
105.9

60.1 80.8
101 5
105.2
110.2

85.7 1045
1030
1079

90.6 1075
1007
105.5
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57

35.3 51.9

68.5 84.3

38.0 56.0

73.9 91.0

88.9 40.8
60 1

79.4 97.7

95.5 43.6

64.3 84.9
104.3
1020

68.4 90.3
102 5
1038

72.5 95.7
1007
105.5
137.1
129.6
122.0
113.8
140.7
133.0
1253
116 9
120 0
144.4
1365
1286
119.9
123.2
148.1
139.9
131.8
123.0
126.3
136.6
128.7
120.0
123.3
133.2
1255
117.0
120 2

7.2 7.0

6.9 6.9

7.2 7.0

6.9 69
68 7.2
70 69
69 68
72 7.1

6.9 6.9

6.8 7.1

7.0 7.0

6.9 7.2

7.1 7.0

7.0 85
75°F

48.0 68.4

88.9 112.1

53.3 75.9

98.4 118.6
117.6

58.6 833
1080
125 1
1258
639

90.7 117.5
131.6
134.0

92.1 120.4
128.0
130.4

93.4 123.4
124.4
126.7
95°F

51.8 68.1

84.4 106.1

56.3 73.6

91.0 108.8
110.9

60.8 79.2
976
111.6
114.7

65.3 84.7
104 2
114.3
118.5

90.9 110.8
112.0
116.1

97.1 117.4
109.7
113.7

36.8 57.3
77 7

92.0 40.8

63.4 86.0
101 9
1052

44.9 69.6

94.2 111 8
1153
489
757
102.5
121.7
125.4

76.8 104.1
123.0
126.0

77.8 105.7
124.4
126.7
Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195-YTG-L-1014
XP120 (10 Ton) (Continued)
Temperature of Air on Condenser Coil
CFM I I I I I I i i i
90 80 75 70 65 90 80 75 70 65
2500

43.0 334
3000
3500
4000
4500
5000
Johnson Controls Unitary Products 21

43.9 420

37.6 43.6

35.6 33.5

44.8 427
457

43.4 51.2

59.0 60.6

30.6 47.8

53.8 40.1

47.0 45.1

36.7 344
326

34.7 37.4

43.0 36.1

57.3 65 1
63 1
484

46.6 52.9

53.9 55.5

61.1 44.9
537
51 5

38.4 57.0
689
670

36.0 52.9

63.8 41.6

43.2 334

52.5 595

57.6 40.8
61 1

74.1 72 0

42.5 53.4

44.5 56.4

54.5 48.4

62.5 60.2

42.5 50.4

48.3 46.7
502
52 2

46.4 595
573
Total
Capacity1
(MBh)

34.5 32.6
Total
Capacity1
(MBh)
Sensible Capacity (MBh)
Return Dry Bulb (°F)

28.5 34.9
Sensible Capacity (MBh)
WB Return Dry Bulb (°F)
(°F)
36 1

61.3 86.4

81.4 53.3

70.8 88.4

83.2 896
70 5

80.4 90.3

85.1 91 6
87 6

89.9 92.3

86.9 93.6

92.8 90.0

84.8 91.3

93.9 87.8

82.7 89.1

43.6 67.1

90.6 89.6

57.4 76.0

94.5 91.8

97.4 71.2

84.8 98.4

93.9 99.6

85.0 93.6
102.3

96.1 101.9

97.9 100.0

93.9 99.6
102.3

97.7 91.7

97.3 98.4

92.4 86.4

81.4 100.7

94.5 88.4
832
896
102 9

96.6 90.3
851

91.6 105 2

98.7 92 3

86.9 936

96.3 900
848

91.3 93.9

87.8 827
89 1

38.8 62.0

70.8 68.5

40.2 64.2

67.7 69.8

41.6 66.5

64.6 71.0

13.1 12.9

12.7 12.6

13.1 12.9

12.7 126

12.7 13.0
129

12.7 12.5

12.7 13.0

12.8 12.7

12.5 12.7

12.9 12.7

12.6 12.8

13.0 12.8

12.6 12.8

29.5 46.4

63.3 74.2

32.4 50.9

69.5 81 5

79.5 35.3

55.5 757

88.8 86.6

38.2 60.1
820

96.1 93.8

63.1 86.0

93.9 95.5

66.1 90.1

91.7 97.3
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 | 85
115°F

39.8 56.7

73.6 89.6

44.9 63.4

82.0 91 8

92.0 49.9

70.1 90.4

93.9 97.0

55.0 76.8

98.7 96.1
101 9

80.5 98.2

93.9 99.6

84.2 97.7

91.7 97.3

1. These capacities are gross ratings. For net capacity, deduct air blower motor, MBh = 3 415 x kW Refer to the appropriate Blower Performance Table for the kW of the supply air blower motor.

2. These ratings include the condenser fan motors (total 1 kW) and the compressor motors but not the supply air blower motor.

11.8 11.6

11.5 11.3

11.8 11.6

11.5 11 3
11 4

11.8 116
114
11 3
11 4

11.8 116
114

11.3 11.4

11.7 11.5

11.4 11.5

11.7 11.5

11.4 11.5
| 85
125=F

32.0 51.1

68.3 81.4

39.2 58.3

77.5 83.2
826

46.3 656

86.8 85.1
881

53.5 729

92.3 86.9

93.6 75.3

90.0 84.8

91.3 77.7

87.8 82.7

89.1 109.0
102.2

95.4 89.6
111.7
104.7

97.7 91.8

97.4 114.3
107.1
100.0

93.9 99.6
116.9
109.6
102.3

96.1 101.9
107.1
100.0

93.9 99.6
104.6

97.7 91 7

97.3 23.6

40.8 58.0

64.0 26.7

45.9 65.0
71 9
70 1

29.7 50.9

72.0 79 9
77 8

32.7 55.9

79.0 86.9

85.5 57.7

81.8 84.8

87.3 59.6

84.5 82.7

89.1 433
652

79.3 77.0

45.6 68.6

76.4 78.1

48.0 72.0

73.6 79.2
Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195- YTG-L-1014
XP150(12.5 Ton)
Temperature of Air on Condenser Coil
CFM I I I i i i i i i 90 80 75 70 65 90 80 75 70 65
3125

74.0 724
3750
4375
5000
5625
6250
3125

70.8 642
3750
4375
5000
5625
6250
22 Johnson Controls Unitary Products

97.3 101.0
923
1087
1064
100.5
108.0

69.0 693
104.0
110.8

85.1 90.4
859
836

80.7 83.8

89.0 924

73.9 74.2

79.8 78.5

80.9 78.0
102.4
122.8
130.3
756
990
100 1

68.8 89.3

64.9 84.5

81.5 105.5
108.9

93.1 1153
118.4

97.3 1158
1184

86.7 103.4
100.5

61.0 776

59.2 84.1
104.6
874
1120
117 6

61.1 85.7
107.2
108.2

78.1 1006
1058

99.6 1231
129.9
809
1063
1075
107 5
113.7
86 5

86.0 69.7

98.0 121 9
125.3

88.9 1148
1184
763

97.9 98.2

95.3 98.4
932

95.8 66.1
92 9
1163
1174

96.8 123.3
129.4

96.3 102.0
61 5
884
1083
108.6

52.1 74.4

91.0 81.5
100 6

99.3 66.1

84.3 84.6

78.8 79.1

66.2 93.6
116 1
121 3
733
103 1
1276
133 3
866
1075
1069

76.2 77.3
81 7
828
87 1
88 3

56.8 81 4

99.6 99.9
71 2
91 1

91.4 WB (°F)

70.2 91.7

92.8 57.7

81.3 101 4

66.8 86.9

74.2 962

99.3 Sensible Capacity (MBh)
Return Dry Bulb (°F)
Sensible Capacity (MBh)
Return Dry Bulb (°F)
Total
Capacity1
(MBh)
Total
Capacity1
(MBh)

56.2 78.5

98.1 71 1
100 1
1254
1266
764
107 6
1285
1279

81.6 115 1
131 6
1292

80.4 112.6
139.1
145.2

84.1 118.6
142.1
148.9

87.9 124.7
145.1
152.6

12.7 12.6

12.4 12.2

12.8 12.6

12.5 12.3
12 3

12.9 12.7

12.6 123
123

12.9 12.8

12.6 12.4

12.4 12.8

12.6 12.4

12.4 12.8

12.7 12 4
12 4

10.4 10.2

10.0 9.9

10.5 10.3

10.1 99
99 10.6

10.4 10.2
10 0

10.0 106
104

10.2 10.1

10.1 10.5

10.3 10.1

10.1 10.5

10.3 10.2

10.2 47.4

69.8 92.2
111.8

52.1 76.6
101.2
122.7
123.7

56.7 83.4
110.2
133.6
134.7

61.3 90.3
119 2
144.5
145.8
973
128 5
149.5
148.9
104.4
137 9
154.4
152 1

48.5 72.2

95.8 115.9

53.2 79.2
105.1
127.1
130.3

57.9 86.2
114.4
138.4
141 8
627

93.2 1238
149.7
153.4
100.2
133.1
1553
1584
107.3
142.5
160.9
163.5

74.7 97.1
119.5
131.3

83.0 107.6
132.2
138.2
136 2

91.3 118.1
144.8
145.2
143.0

99.6 128.6
157.5
152.1
149.8
139.3
163.0
153.2
150.9
150.0
168.5
154.4
152 1
167.8
160.2
152.6
136.6
176.1
168.2
160.2
143.4
145.7
184.5
176 1
167 8
150 2
152 7
192.8
184.1
175 4
157 0
159.6
186.4
177.6
159.0
161.5
188.6
179.7
1609
163 5

63.7 89.6
111.7
114.8

66.2 95.4
116.9
117 2
71 0
102.3
121 4
120 1

75.7 109.3
125.9
123.0

80.2 105.2
130.1
142.0

85.3 112.7
140.0
148.6
155.3

90.4 120.2
149.9
155.3
162.3

95.5 127.7
159.9
162.0
169.3
141.2
175.4
164.7
172.1
154.7
190.9
167.4
174.9
158.2
150.8
143.3
131.3
166.6
158.8
150.9
138.2
136.2
175.0
166.7
158.5
145.2
143.0
183.3
174.7
166.0
152.1
149.8
176.0
167.3
153.2
150.9
177.3
168.5
154.4
152.1
177.3
169.6
161.9
142.0
185.6
177.6
169.5
148.6
155.3
194 0
185.6
177.2
155.3
162.3
202.3
193.6
184.8
162.0
169.3
196.8
187.9
164.7
172.1
200.0
190.9
167.4
174.9

68.2 92.3
116.4
128.8

78.0 102.7
127.3
134.3
131 7

87.9 113 1
138.2
139.8
137.2
97 8
123.5
149.2
145.4
142 6
133.3
152.9
146 9
144.1
143.2
156.6
148.4
145.5

49.6 74.5

99.4 120.0

54.4 81.7
109.1
131 6
1368

59.2 88.9
118 7
143.2
148.9

64.0 96.2
128 3
154 8
161.0
103.2
137.7
161.1
167.9
110.2
147.0
167.4
174.9
| 85
85=F

63.0 86.6
110.3
135.4

68.7 94.7
120.6
1426
145.7

74.4 1027
1309
149.8
152 7
80 1
110 7
141.2
157.0
159.6
120.3
153.1
159.0
161.5
129.8
165.0
160.9
163.5
105°F

56.5 78.9
101.2
122.6

62.7 87.4
112.0
130.2
128.9

69.0 95.9
1228
137.8
1358

75.2 104.4
133 6
145.4
142.6
112.6
143 1
146 9
144.1
120.7
152 7
148.4
145.5

75.8 106.3
132 2
1359

80.2 113 1
1353
1384

84.7 1199
1383
140.9
77 72
67 62
77 72
67 62
57 77
72 67
62 57
77 72
67 62
57 72
67 62
57 72
67 62
57 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57

11.4 11.3

11.1 10.9

11.5 11.3

11.2 11.0

10.9 11.6
11 4
112
110
110

11.6 115
113
111
111

11.5 113
111
111
115
113
111
111

9.4 9.2

8.9 8.8

9.5 9.2

9.0 89
89 9.6
93 9 1
90 90

9.7 9.4

9.1 9.1

9.1 9.5

9.2 9.1

9.2 9.6

9.3 9.2

9.3 43.1

65.5 87.8
104.4

47.5 72.1

96.7 114.9
115.2

51.8 78.7
105.6
125.5
1257

56.2 85.3
114.5
136.0
136.3
91 8
123.1
142.2
140.9

98.2 131 8
148.4
145.5

77.5 101.1
124.8
136.6

84.2 110.1
136.1
143.4
145.7
90 9
119 1
147.4
150.2
152 7
976
128.1
158.7
157.0
159.6
140.3
169.2
159.0
161.5
152.4
179.7
160.9
163.5
154.6
145.2
135.7
128.8
161.3
151.5
141.6
134.3
131.7
168 0
157.8
147.5
139 8
137.2
174 6
164 0
153.4
145.4
142.6
165 7
155.0
146 9
144 1
167 4
156.6
148 4
145 5
85 75°F

64.9 89.8
114.8
139.6

69.8 97.2
124.5
147 1
155.3
748
104.6
134.3
154.5
162 3

79.7 111.9
144.1
162.0
169.3
122.2
156.7
164.7
172.1
132.4
169.3
167.4
174.9
95°F

61.1 83.5
105.8
131.2

67.5 92.1
116.7
138.2
136.2

74.0 100.8
1275
145.1
143.0

80.5 109.4
138.4
152.1
149.8
118.3
149.5
153.2
150.9
127.2
1607
154.4
152.1
Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195-YTG-L-1014
XP150 (12.5 Ton) (Continued)
Temperature of Air on Condenser Coil
CFM I I I I I I i i i
90 80 75 70 65 90 80 75 70 65
3125
57 5 50.9
3750
4375
5000
5625
6250
Johnson Controls Unitary Products 23

57.2 70.7
61 9
61 3

81.2 98.0

94.6 70.5

69.8 53 3

63.8 523

79.5 923
908

57.9 69.6
682

73.1 71.1

43.9 66.2

76.7 62.5

75.3 73.9

66.5 637
547

53.3 662

65.6 622

60.6 48.0

70.3 83.8

66.9 832
826

76.5 93.7

91.7 75.8

72.4 48.1

72.9 84.5

83.1 67.1

81.1 79.5

71.4 86.9

84.1 584

56.9 62.0
770
764
Sensible Capacity (MBh)
Return Dry Bulb (°F)

75.7 92.6

88.7 Sensible Capacity (MBh)
Return Dry Bulb (°F)

71.7 89.5

88.8 Total
Capacity1
(MBh)
Total
Capacity1
(MBh)

70.7 66.8

56.9 839
1003

99.7 WB
(°F)

61.4 907
108.5
107.8

65.6 97.1
114.3
112.3

69.8 103.4
120.2
116.8

56.5 86.1
100.1

98.5 60.2

91.9 107.3
104.5

63.9 97.6
114.5
110.6
151.0
139.6
128.2
126.2
156.0
144.2
132.4
130.4
127 3
161.0
148.8
136.6
134.5
131 3
166.0
153.4
140.8
138.7
135.4
155.5
142.7
140.5
137.2
157.5
144.6
142.4
139.0
147.4
134.0
120.6
123.6
150.7
136.9
123.1
126.4
122 8
154 0
139 8
1257
129.2
125.5
157.3
142 8
128.2
132.0
128.2
145.2
130.4
134 2
130 3
147.6
132.7
136 4
132 5

38.8 61.1

83.5 97.0

42.8 67.5

92.2 107 2
106.6

46.9 74.0
101 0
117 3
116 7

51.0 80.4
1098
127.5
126.8

86.2 117.7
135.0
132.9

92.0 125.6
142.4
139.0

15.3 15.2

15.0 14.7

15.4 15.2

15.1 14.8

14.9 15.4

15.3 15.2

14.9 15.0

15.5 154

15.3 15.0
15 1

15.4 15.3

15.0 15.1
15 4

15.3 15.0

15.1 1. These capacities are gross ratings. For net capacity, deduct air blower motor, MBh = 3.415 x kW. Refer to the appropriate Blower Performance Table for the kW of the supply air blower motor.

2. These ratings include the condenser fan motors (total 1 kW) and the compressor motors but not the supply air blower motor.

34.5 56.8

79.2 89.6

38.2 63.0

87.8 99.4
98 1

42.0 692
964
1092
107.7

45.8 75.4
105.0
119.0
117.4

80.6 112.3
127.7
124.9

85.8 119.5
136.4
132.5

14.0 13.9

13.7 13.5

14.1 13.9

13.8 13 5
13 6

14.2 140
13 9
13 6
13 7

14.2 14 1

13.9 13.7

13.7 14.1

14.0 13.7

13.7 14.1

14.0 13.7

13.7 77
72 67
62 77
72 67
62 57
77 72
67 62
57 77
72 67
62 57
72 67
62 57
72 67
62 57
| 85
115°F

51.9 74.3

96.7 114.1

57.9 82.6
107.4
122.3
121.7

64.0 91 0
118 1
1305
1286

70.0 99.4
1288
1387
1354
106.8
136.7
140.5
137.2
114.2
144.6
142.4
139.0

52.9 82.6
110.2
123.6

68.1 92.8
117.6
126.4
122.8

83.2 103 1
125 1
129.2
125.5
98 3
113 3
128 2
132.0
128.2
121.4
130.4
134.2
130.3
129.6
132.7
136.4
132.5
| 85
125=F

47.4 69.7

92.1 105.5

53.1 77.9
102.7
1143
114.5

58.9 86 1
113 3
123.1
121 3

64.7 94.3
124.0
132.0
128.2
101.0
130.3
134.2
130.3
107.7
132.7
136.4
132 5

61.6 87.4
113.3
126.2

73.1 97.8
122.5
130.4
127.3

84.5 1081
131 6
134.5
131 3

95.9 118.4
140.8
138.7
135.4
127.4
142.7
140.5
137.2
136.4
144.6
142.4
139.0

52.4 77.1
92 1

91.5 Air on
Evaporator Coil Total
Input
(kW)2
Total
Input
(kW)2
528195- YTG-L-1014
XP078-150 Heating Capacities
XP078-150
Capacity ,1 Outdoor Temperature (°F @ 72% RH) 1 &
Model
kW CFM DB (°F)
55 1950 70
80 55
XP 2600 70
80 55
3250 70
80 55
2250 70
80 55
XP 3000 70
80 55
3750 70
80 55
2550 70
80 55
XP 3400 70
80 55
4250 70
80 24 Johnson Controls Unitary Products
078
(6 5)
090
(7 5)
102
(8.5)
Size
(Tons)
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
MBH
KW
20 44 S

4.70 39.5

5.55 35.7

6.14 48.1
422

42.7 505
390
567

48.5 385
432
470
39 3

5.29 53.0

5.6 51.0

6.7 48.6

7.5 55.7

5.1 53.6

6.1 51.5

7.0 56.7

4.6 54.7

5.7 52.3

6.5 48.0

5.5 50 8
67 49.7

7.5 53 5

4.9 56.3

6.2 55.1
70 55 8

4.6 586

5.9 57 5
67 0

21.7 4.30

16.4 5.15

12.5 5.74

25.0 383
196

4.65 158
527
253
345
200

4.30 162
489

29.3 5.2

27.3 6.3

24.9 7.1
320

4.6 299

5.7 27.7

6.6 33.0

4.2 31.0

5.3 28.6

6.1 22 3

5.1 251

6.3 24.0

7.1 278
45 306
58 294

6.6 301

4.2 329

5.4 31 8

6.3 40

68.0 5.09

62.7 5.94

58.8 6.53

71.3 462

65.9 5.44

62.1 6.06

71.6 424
66 3

5.10 62.4
568
76 7

6.1 74.7

7.1 72.3

7.9 79.4

5.5 77.3

6.6 75.2

7.4 80 5

5.1 78.5

6.1 76.1

6.9 73.7

5.9 76.5

7.1 75.4
79 79.2

5.4 820
66 808

7.4 81.5

5.0 84.3
63 832
71 10

33.3 4.50

28.0 5.35

24.1 5.94

36.6 4.03

31.2 4.85

27.4 5.47

36.9 3.65

31.6 450

27.7 509

41.1 54

39.1 6.5

36.7 7.3

43.8 4.9

41.8 5.9

39.6 6.8

44.9 4.4

42.9 5.5

40.5 6.3

35.1 5.3

37.9 6.5

36.8 7.3

40.6 4.7
434

6.0 42.3

6.8 42.9

4.4 45.7

5.6 44.6

6.5 60

91.1 5.49

85.8 6.34

81.9 6.93

94.4 5.02

89.0 5.84

85.2 6.46
947
464

89.5 5.49

85.6 6.08
100.5

6.5 984
76 96.0
84 1032
59 101.1

7.0 98.9

7.8 1042
55 1022

6.6 99.8

7.3 99.4

6.3 1022

7.5 101.1
84 104.9

5.8 107.7

7.0 106.6

7.8 107.2

5.4 110.0

6.7 108.9

7.5 30

56.4 489

51.1 5.75
472
633

59.7 442

54.3 524

50.5 5.86

60.0 405
547
490

50.9 548

64.9 59
628
69 604
77 676

5.3 65.5

6.3 633
72 686
48 666
59 642
67 60.8

5.7 63.7

6.9 625

7.7 66.3

5.2 69.1

6.4 68.0

7.2 68.6

4.8 71 4

6.1 70.3

6.9 50
79 5

5.29 74.2

6.14 704

6.73 82.8

4.82 77.4

5.64 73.7

6.26 832

4.44 779
529

74.0 588

88.6 6.3

86.6 7.4

84.2 8.1

91.3 5.7

89.2 6.8

87.1 7.6

92.3 5.3

90.3 6.3

87.9 71

86.5 6.1

89.4 7.3

88.2 8.2
920
56 94.8

6.8 937
76 94.3

5.2 97 1

6.5 96.0

7.3 -10

10.1 4.10

4.8 4.95

0.9 5.54

13.4 363

8.0 445

4.3 507

13.8 325

8.5 4.11

4.6 4.69

17.4 5.0

15.4 6.1

13.0 6.9

20.1 44

18.0 5.5
15 9
64 21 2

4.0 19.1

5.1 16.7
59 9.4

4.9 122

6.1 111

6.9 14.9

4.3 17.7

5.6 166

6.4 172

4.0 20.0

5.2 18.9

6.1 Air Over Evaporator
Coil
528195-YTG-L-1014
XP078-150 (Continued)
Capacity ,1 Outdoor Temperature (°F @ 72% RH) 1 &
Model
kW
CFM DB {°F)
55 3000 70
80 55
XP 4000 70
80 55
5000 70
80 55
3750 70
80 55
XP 5000 70
80 55
6250 70
80 1. These capacities do not include the supply air blower motor heat. For net capacity, add motor heat, MBh = 3.415 x kW.

Johnson Controls Unitary Products 25
Size
(Tons)
120
(10)
150
(12 5)
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
MBH
kW
50 124.5

6.79 113.8

7.93 111.0

8.68 125.7

6.13 115.0

7.27 112 2

8.03 1254

4.94 114 7

6.08 1118

6.83 143.9

10.76 139.8

12.57 137.8

14.26 152.0

9.49 148.0

11.32 146.0

13.02 153.3

8.90 149.2

10.71 147.2

12.40 60
136.7

7.03 126 1

8.17 1232
892
1379

6.37 1272

7.51 124 4

8.28 137.6

5.18 1269

6.32 1240

7.07 163.5

11.15 159.4
1296
157 4
1465
171.5
988
1675

11.71 1655
1340
1729
929
1688

11.10 1668
1279
10 75.7

5.83 65.0

6.97 62.2

7.72 76.8

5.16 66.2

6.31 63.4

7.07 76.6

3.97 65.9

5.11 63.0
586

65.7 9.21

61.6 11.02

59.6 12.71

73.7 7.94

69.7 9.77

67.7 11.46

75.1 7.35

71.0 9.16

69.0 10.85
20 87.9

6.07 77.2

7.21 74.4

7.96 89.1

5.40 78.4
655

75.6 731

88.8 4.21

78.1 535

75.2 6.11

85.2 9.60
81 2

11.41 79.1

13.10 93.3

8.32 89.3

10.16 87.3

11.85 94.6

7.74 90.6

9.55 88.5

11.23 0

63.5 5.59

52.8 6.73

50.0 7.48

64.6 4.92

54.0 607

51.2 683

64.4 373
537
487
508
562

46.1 882

42.0 10.63

40.0 12.32

54.2 7.55

50.2 9.38

48.2 11.08

55.5 696

51.4 8.77

49.4 10.46
40 112.3

6.55 101.6

7.69 98.8

8.44 113 5

5.89 102.8

7.03 100.0

7.79 113.2
470
102.5

5.84 996

6.59 124 4

10.38 120.3

12.18 118.2

13.87 132.4

9.10 128.4

10.93 126.4
1263
133.8

8.51 129.7

10.32 127.7

12.01 30
100.1

6.31 894

7.45 86.6
820
101.3

5.65 90.6

6.79 878

7.55 101.0
445
903

5.59 874
635
104.8
999
100.7

11.80 987
1348
112.9
871
108.9
1055
106.9
1224
1142
8 13
110.1
993
108.1

11.62 -10

51.3 5.35

40.6 6.49

37.7 7.24

52.4 4 68

41.8 583

39.0 659

52.1 349

41.5 463

38.6 538

26.6 844
225

10.24 20.5

11.93 34.6

7.16 30.6
899

28.6 10.69

36.0 6.57

31.9 8.38

29.9 10.07
Air Over Evaporator
Coil
528195- YTG-L-1014
Airflow Performance
XP078-150 Side Duct Application
XP078 (6.5 Ton) Side Duct
1 Available External Static Pressure - IWG

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP FS4 Hi Static 2 HP & Drive
XP090 (7.5 Ton) Side Duct
1 Available External Static Pressure - IWG

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP FS7 Standard 1.5 HP & Drive
XP102 (8.5 Ton) Side Duct

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP
Standard 2 HP & Drive
3 HP & Field Supplied Drive
26 Johnson Controls Unitary Products

RPM BHP RPM BHP
2 HP & Field Supplied Drive
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
4200
783
790
797
805
813
823
834
846
860
874
890
1800
2000
2200
2400
2600
2800
3000
3200
3400
768
781
793
804
814
825
837
850
864
880
826
840
852
862
873
884
896
909
923
939

0.65 0.74
082

0.92 1.02

1.13 1.25

1.39 1.55

1.72 1.92
859
870
882
894
906
918
931
943
956

0.99 1.09

1.18 1.29
1 40

1.51 1.63

1.76 1.89
920
932
944
956
968
980
992
1005
1018

1.16 1.25

1.35 1.45

1.56 1.68

1.80 1 92

2.06 966
972
980
987
996
1006
1017
1029
1043
1057
1073
2000
2200
2400
2600
2800
3000
3200
3400
3600
3800

1.56 1.65

1.74 1.83

1.93 2.05
2 17

2.31 2.47

2.64 2.83

1.43 1.53

1.62 1.73
1 84

1.95 2.07

2.20 639
654
669
686
705
725
746
768
792
734
741
748
756
765
774
785
798
811
826
842

0.73 0.81

0.90 1.01
1 13

1.26 1.41

1.58 1.76

1.96 1003
1016
1028
1039
1049
1060
1072
1085
1100
1115

0.63 0.69

0.76 0.85

0.94 1.04
1 15

1.27 1.40

0.96 1.04

1.14 1.24

1.36 1.50

1.65 1.82

2.00 2.20

1.79 1.87

1.97 207
2 19
233
248
265
283

3.03 1.61

1.69 1 78

1.89 201
2 14
229
246
264
284
1058
1072
1084
1094
1105
1116
1128
1141
1155
1171
1110
1124
1136
1146
1157
1168
1180
1193

0.84 0.93

1.02 1.11

1.21 1.32

1.45 1.59

1.75 1.92
2 11
1066
1078
1090
1102
1114
1126
1138
1151
Air Flow
(CFM)

0.48 0.57

0.66 0.76

0.88 1.02

1.17 1.34

1.52 1.72

1.95 204
2 13
224
236
249

2.64 2.81
Air Flow
(CFM)
Air Flow
(CFM)
711
724
736
747
757
768
780
793
807
823
830
837
844
552
861
871
882
894
907
922
938
441
470
500
529
558
587
616
645
674
656
670
682
692
703
714
726
739
753
769
921
928
936
943
952
962
973
985
999
1013
1029

1.91 2.00

2.09 2.18
228

2.39 252

2.66 2.81

2.99 3.18
719
730
743
756
771
788
806
825
846
876
883
890
898
907
917
928
940
953
968
984
966
978
990
1002
1014
1026
1038
1051
1064
632
639
646
654
663
673
684
696
709
724
740
552
571
591
612
635
658
683
710
737

0.44 0 53
062
0 71
0 81

0.93 1.05

1.19 1.35

1.52 1.71
785
795
806
819
832
847
863
879
897

0.81 0.89

0.97 1.07

1.17 1.29

1.41 1.55

1.70 886
899
911
922
932
943
955
968
983
998

1.21 1.30

1.39 1.48

1.58 1.69
1 82
1 96

2.12 229
248

1.39 1.48

1.57 1.66

1.76 1.87
200

2.14 229

2.47 266

1.35 1.44

1.54 1.64

1.75 1.87

1.99 2.12
225

0.72 0.79

0.87 0.96

1.05 1.16

1.28 1.41

1.55 945
959
970
981
992
1003
1014
1027
1042
1058

1.74 1.83

1.92 2.01

2.11 2.22
234

2.48 2.64
282
301
619
631
642
652
663
675
688
703
718
684
691
698
706
714
724
735
747
761
776
792

0.24 0.32

0.41 0.52

0.64 0.77

0.92 1.09

1.28 1.47

0.07 0 16

0.27 0.39

0.53 0.68

0.84 1.03

1.23 0.23

0.32 0.41
0 50
060
071
0 84

0.98 1.14

1.31 1 50

1.41 1.49

1.58 1.69
1 81

1.94 209
226
244
264

1. Blower performance includes gas heat exchangers and 2” filters. See STATIC RESISTANCE table for additional applications.

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP.

3. kW = BHP x 0.932

4. Field Supplied Drive.

0.44 0.48

0.54 0.60
068

0.78 0 88

1.00 1.14

0.54 0.59

0.66 0.73

0.82 0.92

1.02 1.14

1.27 1.03

1.12 1.21

1.30 1.40

1.51 1.63

1.78 1.93
2 11

2.30 1.25

1.35 1.44

1.55 1.66

1.77 1.89
202

2.15 1. Blower performance includes 2” filters. See STATIC RESISTANCE table for additional applications

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP x 0.932.

1.19 1.27

1.36 1 47
1 59

1.73 1.88

2.04 2.23

2.43 1051
1058
1065
1073
1082
1091
1102
1115
1128
1143
1159

1. Blower performance includes gas heat exchangers and 2" filters See STATIC RESISTANCE table for additional applications. 2 See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHPx .932.

4. Field Supplied Drive.
1009
1015
1023
1031
1039
1049
1060
1072
1086
1100
1116
1018 '
1030 '
1042 •
1054 '
1066 '
1078 '
1090 •
1103 ;
1116 ;
FS4

RPM BHP RPM BHP RPM BHP
Standard 1.5 HP & Drive
Available External Static Pressure - IWG1

RPM BHP RPM BHP RPM BHP
Hi Static 3 HP & Dnve

RPM BHP RPM BHP RPM BHP
Hi Static 3 HP & Drive
528195-YTG-L-1014
XP120 (10 Ton) Side Duct
1 Available External Static Pressure - IWG

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP
Standard 2 HP & Drive
3 HP & Field Supplied Drive
XP150(12.5 Ton) Side Duct

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP 3 HP & Field Supplied Drive Standard 3 HP & Drive
Hi Static 5 HP & Drive 5 HP & Field Supplied Drive
Johnson Controls Unitary Products 27
2600
2800
3000
3200
3400
3600
3800
4000
4200
4400
4600
4800
5000
3200
3400
3600
3800
4000
4200
4400
4600
4800
5000
5200
5400
5600
5800
6000
6200

RPM BHP RPM BHP
Hi Static 3 HP & Drive
Air Flow
(CFM)
Air Flow
(CFM)
797
805
813
823
834
846
860
874
890
908
926
946
967
844
852
861
871
882
894
907
922
938
955
974
993
1014
962
973
985
999
1013
1029
1046
1065
1085
1106
1128
1151
1176
1201
1228
1256
1006
1017
1029
1043
1057
1073
1091
1109
1129
1150
1172
1195
1220
1246
1272
1300
698
706
714
724
735
747
761
776
792
809
827
847
868
774
785
798
811
826
842
859
877
897
918
940
964
988
1014
1041
1068
917
928
940
953
968
984
1001
1020
1040
1061
1083
1106
1131
1156
1183
1211
936
943
952
962
973
985
999
1013
1029
1046
1065
1085
646
654
663
673
684
696
709
724
740
757
776
795
816
724
735
747
761
776
792
809
827
847
868
890
914
938
964
990
1018
871
882
894
907
922
938
955
974
993
1014
1037
1060
1084
1110
1137
1165

1.21 1.30

1.40 1.51

1.63 1.78

1.93 2 11

2.30 2.51

2.74 2.98

3.25 1.39

1.48 1.58

1.69 1.82

1.96 2.12

2.29 2.48

2.69 2.92

3.16 3.43

1.51 1.63

1.78 1.93
2 11

2.30 2.51

2.74 2.98

3.25 3.53
382

4.14 4.47
482
518
673
684
696
709
724
740
757
776
795
816
839
862
886
912
939
967
1 87
200

2.14 229

2.47 266
287
3 10
334

3.61 389
4 18

4.50 483

5.18 5.54

1.74 1.83

1.93 2.05

2.17 231

2.47 264

2.83 3.04

3.27 748
756
765
774
785
798
811
826
842
859
877
897
918

1.57 1.66

1.76 1.87
200

2.14 229

2.47 266
287

3.10 3.34
239
252

2.66 281
299
3 18

3.39 362

3.86 4 13

4.41 4.70

5.02 5.35

5.70 0.82

0.92 1.02

1.13 1.25

1.39 1.55

1.72 1.92

2.13 2.35
260

2.86 1.13

1.25 1.39

1.55 1.72

1.92 2.13

2.35 2.60

2.86 3.14

3.44 3.76

4.09 4.44

4.80 823
834
846
860
874
890
908
926
946
967
989
1012
1037
1063
1089
1117

1.32 1.45

1.59 1.75

1.92 211

2.32 2 55

2.79 3.06

3.34 3.64

3.95 4.28
463

4.99 980
987
996
1006
1017
1029
1043
1057
1073
1091
1109
205

2.17 231
247
264
283

3.04 327

3.52 378

4.06 436
467

5.01 5.35

5.72 1.92

2.01 2 11
222
234

2.48 2.64
282

3.01 3.22

3.45 222
234

2.48 2.64
282

3.01 322

3.45 3.69
395
423
453
485

5.18 5.53
890
898
907
917
928
940
953
968
984
1001
1020
1040
1061
1 69

1.82 1.96
2 12

2.29 2.48

2.69 2.92

3.16 3.43

3.71 401
4 32

4.65 500
5 36
1049
1060
1072
1086
1100
1116
1134
1152
1172
1193
1215
1238
1263
1289
1315
1065
1073
1082
1091
1102
1115
1128
1143
1159
1176
209
2 18
228
239
252

2.66 2.81

2.99 3.18

3.39 1. Blower performance includes 2" filters See STATIC RESISTANCE table for additional applications 2 See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP X 0.932.

1. Blower performance includes 2” filters. See STATIC RESISTANCE table for additional applications

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP x 0.932.

0.41 0.50

0.60 0.71

0.84 0.98

1.14 1.31

1.50 1.71

1.94 2.19
245

1.02 1.11

1.21 1.32

1.45 1.59

1.75 1.92
2 11

2.32 2.55

2.79 3.06
1091
1102
1115
1128
1143
1159
1176
1194
1214
1235
1257
1281
1305
1331
1358

0.62 0.71

0.81 0.93

1.05 1.19

1.35 1.52

1.71 1.92
2 15

2.40 266

0.93 1.05

1.19 1.35

1.52 1.71

1.92 2.15

2.40 2.66

2.94 3.24

3.55 3.89

4.23 4.60
1023
1031
1039
1049
1060
1072
1086
1100
1116
1134
1152

0.71 0.84

0.98 1.14

1.31 1.50

1.71 1.94

2.19 2.45

2.73 3.03

3.34 3.67

4.02 4.39
Available External Static Pressure - IWG1

RPM BHP RPM BHP RPM BHP
2 HP & Field Supplied Drive
528195- YTG-L-1014
XP078-150 Bottom Duct Application
XP078 (6.5 Ton) Bottom Duct

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP FS Hi Static 2 HP & Drive 4
XP090 (7.5 Ton) Bottom Duct
Available External Static Pressure - IWG1

0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP Standard 1.5 HP & Drive Hi Static 3HP& Drive
3 HP & Field Supplied Drive
XP102 (8.5 Ton) Bottom Duct

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP Standard 2 HP & Drive Hi Static 3 HP & Drive
3 HP & Field Supplied Drive
28 Johnson Controls Unitary Products

RPM BHP RPM BHP
2 HP & Field Supplied Drive

RPM BHP RPM BHP
Standard 1.5 HP & Drive
2000
2200
2400
2600
2800
3000
3200
3400
3600
3800
990
1012
1035
1058
1082
1107
1133
1160
1187
1215
799
820
846
867
889
915
943
972
1005
1086
1109
1137
1156
1178
1201
1225
1252
1800
2000
2200
2400
2600
2800
3000
3200
3400
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
4200
698
720
743
766
790
815
840
867
894
923

0.38 0.53

0.69 0.87

1.06 1.27

1.49 1.73

1.97 2.22

0.75 0.87

1.03 1.14

1.27 1.43

1.60 1.81

2.03 1.66

1.81 1.97
2 15
234
255
277

3.01 1.46
1 61

1.77 1.95

2.14 235
257
280
305
330
Air Flow
(CFM)
Air Flow
(CFM)
Air Flow
(CFM)
648
674
705
729
758
788
822
858
897
730
753
781
801
826
854
885
917
953
874
896
919
942
967
991
1017
1044
1071
1099
933
956
978
1002
1026
1051
1076
1103
1130
1158
1010
1025
1041
1060
1081
1104
1130
1158
1189
1222
1256
1090
1113
1135
1159
1183
1208
1233
1260
559
589
624
653
685
719
757
797
839
770
784
801
819
841
864
890
918
948
981
1016
814
836
859
882
906
931
957
984
1011
1039
918
933
949
968
989
1012
1038
1066
1097
1130
1164
937
960
988
1007
1028
1051
1076
1102
1130
1038
1061
1088
1108
1128
1151
1176
1203
1230

1.59 1.69

1.80 1.94
209

2.26 245

2.67 2.91

3.16 3.44

2.09 224

2.40 2.58

2.78 298

3.20 445
486
530
567
605
645
686
729
772
0 11

0.26 0.42

0.60 0.80

1.00 1.22

1.46 1.70

1.96 717
732
748
767
788
811
837
865
896
928
963

0.62 0.77

0.93 1.11

1.31 1.52

1.74 1.97

2.21 2.47
821
835
852
871
892
915
941
969
999
1032
1067
875
898
924
944
965
988
1013
1038
1066
1043
1065
1088
1111
1135
1160
1186
1212
1055
1069
1085
1104
1125
1149
1174
1203
1233
1266
1301
1131
1153
1176
1199
1223
1248
1274

0.68 0 78

0.90 1.03

1.18 1.36
1 55
1 76

2.00 2.26

2.53 0 83
0 93

1.04 1 17

1.33 1.50
1 69
1 91

2.14 2.40
268

0.72 0.83

0.99 1.09

1.21 1.36

1.53 1.73

1.93 1.06
1 21

1.37 1.55

1.74 1.95

2.17 2.40

2.65 2.90

1.35 1.44

1.56 1.69

1.84 202
221

2.43 266
292
320
662
677
693
712
733
757
782
810
841
874
909

1.87 202
2 18
236
255
276
298
321
644
666
689
712
736
761
787
813
841
869

0.85 1.00

1.16 1.34

1.53 1.74

1.96 2.19

2.44 2.69

1.08 1.21

1.39 1.50

1.63 1.80

1.97 2.16

2.36 755
777
800
823
847
872
898
924
952
980

0.99 1.13

1.31 1.41

1.55 1.71

1.88 207
227

1.47 1.57

1.68 1.81

1.97 2.14

2.33 2.55

2.78 3.04

3.32 0.63

0.71 0.84

0.91 1.02

1.16 1.31

1.49 1.70

1. Blower performance includes gas heat exchangers and 2” filters. See STATIC RESISTANCE table for additional applications.

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP.

3. kW = BHP x 0.932.

4. Field Supplied Drive.

1. Blower performance includes 2” filters. See STATIC RESISTANCE table for additional applications

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP x 0.932.

0.69 0.79

0.94 1.04

1.16 1.29

1.46 1.64

1.84 1.09

1.19 1.31

1.44 1.59

1.77 1.96

2.18 2.41
267
2 95

1.05 1 18

1.35 1.47

1.60 1.75

1.93 2 11

2.31 0.96

1.06 1.18

1.31 1.46
1 64
1 83

2.04 2.28

2.54 281
1 26

1.41 1.57

1.75 1.94

2.15 2.37

2.61 2.85

3.10 965
979
996
1014
1036
1059
1085
1113
1143
1176
1211

1.11 1.25

1.42 1.54

1.67 1.83

2.00 2.19

1. Blower performance includes gas heat exchangers and 2" filters See STATIC RESISTANCE table for additional applications.

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHPx.932.
4 Field Supplied Drive.

0.89 1.02

1.19 1.31

1.45 1 60

1.77 1 96
2 16

1.22 1.32

1.44 1.57

1.72 1.89

2.09 2.30

2.54 2 80
307

1.71 1.81

1.92 2.06

2.21 238

2.58 2.79

3.03 3.28
0 53

0.63 0.75

0.88 1.03

1.20 1.40
1 61

1.85 2 11
2 38
870
885
901
920
941
964
990
1018
1049
1082
1117
1098
1112
1129
1148
1169
1192
1218
1246
1276
1309

0.66 0.76

0.90 0.98

1.10 1.24

1.39 1.57

1.77 984 '
1007 ’
1034 ■
1055 •
1075 ’
1099 •
1123 '
1149 ;
1177 ;
FS4

2.0 RPM BHP

0.2 RPM BHP
FS3
Available External Static Pressure - IWG1
Available External Static Pressure - IWG1
528195-YTG-L-1014
XP120 (10 Ton) Bottom Duct
I

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP Standard 2 HP & Drive Hi Static 3 HP & Drive
3 HP & Field Supplied Drive
XP150 (12.5 Ton) Bottom Duct
Available External Static Pressure - IWG1

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP RPM BHP
Standard 3 HP & Drive
5 HP & Field Supplied Drive
RPM Selection
Model HP

1.5 XP
XP
XP
XP
XP
Johnson Controls Unitary Products 29

RPM BHP RPM BHP
2 HP & Field Supplied Drive
2600
2800
3000
3200
3400
3600
3800
4000
4200
4400
4600
4800

RPM BHP RPM BHP
Hi Static 5 HP & Drive
3200
3400
3600
3800
4000
4200
4400
4600
4800
5000
5200
5400
5600
5800
1129
1148
1169
1192
1218
1246
1276
1309

1.92 2.06

2.21 238

2.58 2.79

3.03 3.28
Air Flow
(CFM)
Air Flow
(CFM)
693
712
733
757
782
810
841
874
909
946
985
1026
748
767
788
811
837
865
896
928
963
1000
1040
915
941
969
999
1032
1067
1104
1143
1184
1228
1273
1319
1368
1418
AK71
AK69
AK69
AK89
AK74
AK84
AK74
AK74
BK77
NA
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1052
1012
1038
1066
1097
1130
1164
1202
1241
1282
1325
1370
1417
1465
1041
1060
1081
1104
1130
1158
1189
1222
1256
1149
1174
1203
1233
1266
1301
1338
1377
1418
1461
1506
1553
VL44
1VL40
1VM50
1VP50
1VP50
1VM50
1VM50
1VM50
1VP56

1.56 1.69

1.84 202
221

2.43 266
292
320
1104
1130
1158
1189
1222
1256
1294
1333
1374
1417
1462
1509
1192
1218
1246
1276
1309
1344
1381
1420
1461
1505
1550
1596
801
819
841
864
890
918
948
981
1016
1053
1092
852
871
892
915
941
969
999
1032
1067
1104
1143
202
221

2.43 266
292
320

3.49 381
4 15
450
487
526
567

1.68 1.81

1.97 2.14
233
255

2.78 3.04

3.32 2.14
233
255
278

3.04 332

3.62 3.93
427
462

5.00 5.38
238
258
279

3.03 328

3.56 3.86
4 18

4.51 487
524

5.63 811
837
865
896
928
963
1000
1040
1081
1124
1169
1216
1264
1315
790
690
955
735
880
785
880
880
1095
226
245
267
291

3.16 3.44

3.74 4.05
439

4.74 5 12

5.51 0.90

1.03 1.18

1.36 1.55

1.76 2.00

2.26 2 53
283
3 15
949
968
989
1012
1038
1066
1097
1130
1164
1202
989
902
1168
889
1067
940
1067
1067
1272

1.50 1.69

1.91 2.14

2.40 2.68

2.98 3.29

3.63 3.98

4.35 4.74

5.15 5.57
1085
1104
1125
1149
1174
1203
1233
1266
1301
757
782
810
841
874
909
946
985
1026
1069
1114
1161
1210
1260
2 30
1 73

3.45 2.30

3.45 2 30

3.45 3.45
5 75
864
890
918
948
981
1016
1053
1092
1133
1177
1222
1268
1317
1367
843
743
1008
775
928
821
928
928
1136
887
796
1062
815
972
858
972
972
1175

1.80 1.94

2.09 226

2.45 2.67
291

3.16 3.44
2 0

1.5 3
2 3
2 3
3 5

1.04 1.17

1.33 1.50

1.69 1.91

2.14 2.40

2.68 2.98
329
Blower
Sheave
AK84
4 Turns
Open
618
Size
(Tons)
078
(6.5)
090
(7.5)
102
(8.5)
120
(10)
150
(12.5)

1.20 1.40

1.61 1.85

2.11 2.38
268

3.00 3.33

3.69 4.06

4.45 4.86

5.28 5 Turns
Open
576
996
1014
1036
1059
1085
1113
1143
1176
1211
2 Turns
Open
702

1. Blower performance includes 2” filters. See STATIC RESISTANCE table for additional applications 2 See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP x 0.932.

1.36 1.55

1.76 2.00

2.26 2.53

2.83 3.15

3.48 3.84

4.21 4.60

5.01 5.43
Max
BHP
1 73

1.64 1.83
2 04

2.28 2.54

2.81 3 11

3.43 3.76
4 12

4.49 4.88

5.29 5.71
6 Turns
Open
NA

1.77 1.96

2.18 2.41

2.67 2.95

3.24 3.56

3.90 4.25

4.62 5.01

5.42 1.44

1.57 1.72

1.89 2.09

2.30 2.54
280

3.07 3.37
1059
1085
1113
1143
1176
1211
1248
1287
1328
1372
1417
1463
1512
1 Turn
Open
748

1. Blower performance includes 2” filters. See STATIC RESISTANCE table for additional applications

2. See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP

3. kW = BHP x 0.932.

Motor
Sheave
VL40
3 Turns
Open
661

0.75 0.88

1.03 1.20

1.40 1.61

1.85 2 11

2.38 268

3.00 3.33

1.18 1.31

1.46 1.64

1.83 2.04

2.28 2 54

2.81 311
3 43

1.89 2.09

2.30 2 54
280

3.07 3.37

3.69 4.02
4 38
4 75

5.14 5.55
Fully
Closed
792
1041
955
1221
930
1110
980
1110
1110
N/A
936
849
1115
851
1016
901
1016
1016
1216
901
920
941
964
990
1018
1049
1082
1117
1154
964
990
1018
1049
1082
1117
1154
1193
1234
1277
1322
1369
1418

1.31 1.44

1.59 1.77

1.96 2.18

2.41 267

2.95 324

RPM BHP RPM BHP RPM BHP
3 HP & Field Supplied Drive
Available External Static Pressure - IWG1
528195- YTG-L-1014
Additional Static Resistance
Economizer1 2 4” Filter Model CFM 1
XP
30 Johnson Controls Unitary Products
Size
(Tons)
078 (6.5)
090 (7.5)
102 (8.5)
120 (10)
150(12.5)
1900
2100
2300
2500
2700
2900
3100
3300
3500
3700
3900
4100
4300
4500
4700
4900
5100
5300
5500
5700
5900
6100
6300
9 0.05

0.06 0.07

0.08 0.09

0.10 0.12

0.13 0.15

0.17 0.19

0.21 0.23

0.25 028

0.30 0.33

0.35 0.38

0.41 0.44

0.47 0.50

0.12 0.13

0.14 0.16

0.17 0.19

0.20 0.22

0.26 0.27

0.29 0.32

0.35 0.38

0.41 0.44

0.47 0.51

0.55 0.58

0.62 0.67

0.71 18

0.06 0.07

0.08 0.09

0.10 0.11

0.13 0.14

0.16 0.18

0.20 0.22

0.24 0.26

0.29 0 31

0.34 0.37

0.40 0.43

0.46 0.49

0.53 0.02

0.02 0.04

0.11 0.18

0.25 0.31

0.37 0.43

0.49 0.54

0.58 0.65

0.69 0.74

0.78 082
086
089
093
096
098

1.01 24

0.07 0.08

0.09 0.10

0.12 0.13

0.15 0.17

0.19 0.21

0.23 0.25

0.28 0.30

0.33 0 35
0 38

0.41 0.44

0.47 050
053

0.56 1. Deduct these values from the available external static pressure shown in the respective Blower Performance Tables.

2. The pressure drop through the economizer is greater for 100% outdoor air than for 100% return air. If the resistance of the return air duct is less than 0.25 IWG, the unit will deliver less CFM during full economizer operation.
54 0.10

0.11 0.13

0.14 0.16

0.18 0.20

0.22 0.24

0.26 0.28

0.31 0.34

0.37 0.40

0.43 0.46

0.49 0.53
0 56
0 59
062

0.65 36

0.08 0.09

0.10 0.11

0.13 0.14

0.16 0.18

0.20 0.22

0.24 0.26

0.29 0.31

0.34 0 37

0.40 0.43

0.46 0.49

0.53 0 56

0.59 Electric Heat kW1
528195-YTG-L-1014
Drive Selection

1. Determine side or bottom supply duct Application.

2. Determine desired airflow.

3. Calculate or measure the amount of external static pressure.

4. 5. Noting the RPM and BHP from step 4, locate the appropriate motor and, or drive on the RPM selection table.

6. Review the BHP compared to the motor options available. Select the appropriate motor and, or drive.

7. 8. Determine turns open to obtain the desired operation point.

Example

1. 2600 CFM

2. 1.6 iwg

3. Using the supply air blower performance table below, the following data point was located: 1268 RPM & 1.95 BHP.

4. Using the RPM selection table below, Size X and Model Y is found.

5. 1.95 BHP exceeds the maximum continuous BHP rating of the 1.5 HP motor. The 2 HP motor is required.

6. 1268 RPM is within the range of the 2 HP drives.

7. Using the 2 HP motor and drive, .5 turns open will achieve 1268 RPM.

Airflow Performance
Example Supply Air Blower Performance
Available External Static Pressure - IWG

0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0

RPM BHP RPM BHP RPM BHP RPM BHP

1.5 HP & Field Supplied Drive
Table X: RPM Selection
Model HP
X Y
Johnson Controls Unitary Products 31
1203
1234
1268
1304
Size
(Tons)
982
1013
1047
1084
2200
2400
2600
2800
925
956
990
1027
1317
1348
1382

1.87 203
221
15 2
1147
1178
1212
1249

0.90 1.06

1.24 1.43

1.48 1.64
1 82
202

1.06 1.22

1.40 1.60

1.61 1 77

1.95 2.14
Air Flow
(CFM)
Using the operating point determined from steps 1,2 & 3, locate this point on the appropriate supply air blower performance table. (Linear interpolation may be necessary.)
1259
1290
1324
1361
1092
1124
1158
1194
Review the RPM range for the motor options available. Select the appropriate drive if multiple drives are available for the chosen motor.
1038
1069
1103
1139

1.21 1.37

1.55 1 75

1.35 1.51
1 69

1.89 0.50

0.66 0.84

1.03 804
835
869
906
866
897
931
968

0.71 0.87

1.05 1.25
Motor
Sheave
1VM50
1VM50
Blower
Sheave
AK74
AK64
Max
BHP

1.73 2 30
2 Turns
Open
1035
1207
1 Turn
Open
1079
1256
5 Turns
Open
897
1039
4 Turns
Open
945
1094
6 Turns
Open
N/A
N/A

1.73 1.90
207
227
3 Turns
Open
“991
1150
Fully
Closed
1126
1308

RPM BHP RPM BHP RPM BHP
Alternate 2 HP & Drive

RPM BHP RPM BHP RPM BHP
Standard 1.5 HP & Drive

1.100

1.050

1.000
Sea Level 0.950
1000 ft

0.900 2000 ft
3000 ft 0.850
4000 ft

0.800 5000 ft

0.750
8000 ft 0.700
9000 ft
10000 ft 0.650

0.600
40 50 60 70 80 90 100
Air Temperature (°F)
6000 ft
7000 ft
528195-YTG-L-1014
Altitude/Temperature Correction Factors
Altitude (Ft.

Electric Heat Minimum Supply Air
Model Voltage
54 XP
XP
XP
XP
XP
32 Johnson Controls Unitary Products
Size
(Tons)
120
(10)
150
(12.5)
078
(6.5)
090
(7.5)
102
(8.5)
3500
3000
3500
4000
3750
3750
7000

0.818

0.802

0.787

0.772

0.758

0.744

0.730
36 1950
1950
1950
2250
2250
2250
2550
2550
2550
3000
3000
3000
3750
3750
3750
1000

1.022

1.002

0.982

0.964

0.947

0.929

0.912
8000

0.788

0.772

0.757

0.743

0.730

0.716

0.703
6000

0.849

0.832

0.816

0.801

0.787

0.772

0.758
4000

0.916

0.898

0.880

0.864

0.848

0.833

0.817
5000

0.882

0.864

0.848

0.832

0.817

0.802

0.787
9000

0.758

0.743

0.729

0.715

0.702

0.689

0.676
3000

0.950

0.931

0.913

0.896

0.880

0.864

0.848
18 1950
1950
1950
2250
2250
2250
2550
2550
2550
3000
3000
3000
3750
3750
3750
10000

0.729

0.715

0.701

0.688

0.676

0.663

0.651
2000

0.986

0.966

0.948

0.930

0.913

0.897

0.880
24 1950
1950
1950
2250
2250
2250
2550
2550
2550
3000
3000
3000
3750
3750
3750
Air
Temp.
40 50
60 70
80 90
100
0 1.060

1.039

1.019

1.000

0.982

0.964

0.946
208/230-3-60
460-3-60
600-3-60
208/230-3-60
460-3-60
600-3-60
208/230-3-60
460-3-60
600-3-60
208/230-3-60
460-3-60
600-3-60
208/230-3-60
460-3-60
600-3-60
9 1950
1950
1950
2250
2250
2250
2550
2550
2550
Minimum Supply Air (CFM)
Heater kW
Correction Factor
528195-YTG-L-1014
Indoor Blower Specifications
Motor Motor Sheave Blower Sheave
Model Belt HP RPM Eff. SF Frame Bore (in.) Model Bore (in.) Model XP
XP
XP
XP
XP
Power Exhaust Specifications
Model Voltage Fuse Size

1. Motors are multi-tapped and factory wired for high speed.

Electric Heat Multipliers
Voltage
Nominal
240
Sound Performance
Indoor Sound Power Levels
Blower
Model CFM ,1
RPM BHP 63 125 250 500 1000 2000 4000 8000
XP 2600 0.6 812 1.14 74 71 73 73 71 69 65 65 60
XP 3000 0.6 854 1.47 77 74 76 76 74 72 68 68 63
XP 3400 0.6 872 1.65 80 77 79 79 77 75 71 71 66
XP 4000 0.6 959 2 29 83 80 82 82 80 78 74 74 69
XP 5000 0.6 1132 3.74 87 84 86 86 84 82 78 78 73
Johnson Controls Unitary Products 33
Size
(Tons)
Size
(Tons)
ESP
(IWG)
2PE04703225
2PE04703246
2PE04703258
480
600
Motor
RPM1
1075
1075
1050
HP
3/4
3/4
3/4

0.75 0.92

0.92 0.92
1725
1725
1725
1725
1725
1725
1725
1725
1725
1725
AK84
AK71
AK69
AK69
AK89
AK74
AK84
AK74
AK74
BK77
CFM @

0.1 ESP
3800
3800
3800
7/8
7/8
7/8
7/8
7/8
7/8
7/8
7/8
7/8
1-1/8
VL40
VL44
1VL40
1VM50
1VP50
1VP50
1VM50
1VM50
1VM50
1VP56
078
(65)
090
(7.5)
102
(85)
120
(10)
150
(12.5)

1. These values have been accessed using a model of sound propagation from a point source into the hemispheric/free field. The dBA values provided are to be used for reference only. Calculation of dBA values cover matters of system design and the fan manufacture has no way of knowing the details of each system. This constitutes an exception to any specification or guarantee requiring a dBA value of sound data in any other form than sound power level ratings.

A54
A52
A52
A54
A56
A54
A56
A54
A54
BX56

0.8 0.8

0.8 0.8

0.8 0.8

0.8 0.8

0.8 0.87
1 1
1 1
1 1
1 1
1 1

1.15 1.15

1.15 1.15

1.15 1.15

1.15 1.15

1.15 1.15
LRA

7.8 3.4

2.9 MCA

6.3 2.8

1.9 078
(6.5)
090
(7.5)
102
(8.5)
120
(10)
150
(12.5)
QTY
1 1
1 56
56 56
56 56
56 56
56 56
184T
208/230-1-60
460-1-60
575-1-60
1-1/2
2 1-1/2
3 2
3 2
3 3
5 Applied
208
230
460
575
Motor
FLA
5 2.2

1.5 10
5 4

1. Electric heaters are rated at nominal voltage. Use this table to determine the electric heat capacity for heaters applied at lower voltages.

Datum Dia.
(in.)

8.1 6.7

6.5 6.5

8.5 7.0

8.0 7.0

7.0I

6.7 Sound Rating
dB(A)
Datum Dia.
(in.)
24-3.4

2.8-3.8

2.6 - 3.6

3.6-4.6

3.4-4.4

3.4-44

3.4-4.4

3.4-4.4

3.4-44

4.3 - 5.3
Sound Power, dB (10-12) Watts
Octave Band Centerline Frequency (Hz)
kW Capacity Multipliers1
528195- YTG-L-1014
Outdoor Sound Power Levels
1 Octave Band Centerline Frequency (Hz)
Model 125 250 500 1000 2000 4000 8000
XP 83 88.0 82.5 81.5 78.0 73.0 69.0 62.0
XP 83 89.5 83.5 82 0 78.0 72.5 680 60.5
XP 83 89.0 84.5 81.5 78.0 72.5 68.5 70.5
XP 83 89.5 83.5 81.0 78.0 72.0 68.5 70.5
XP 84 90.0 84 5 81.5 77.5 72.0 68.5 61.5

1. Rated in accordance with AHRI 270 standard
34 Johnson Controls Unitary Products
Size
(Tons)
078
(6.5)
090
(7.5)
102
(8.5)
120
(10)
150
(12.5)
Sound Rating
dB (A)
528195-YTG-L-1014
Electrical Data
XP078-150 Standard Motor - Without Powered Convenience Outlet Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 13.5 88.0 21.1 2.1 5.2 5.5 0.0
230 13.5 88.0 21 1 2.1 5.2 5.5 0.0
460 6.0 44.0 9.3 1.3 26 22 0.0
575 4.9 34.0 7.7 0.7 20 1.8 0.0
208 13.7 83.1 21.4 2.1 52 5.5 0.0
230 13.7 83.1 21.4 2.1 52 5.5 0.0
460 6.2 41.0 9.7 1.3 26 22 0.0
575 48 33.0 7.5 0.7 2.0 1.8 0.0
208 14.5 98.0 226 2.1 6.8 5.5 0.0
230 14.5 98.0 226 2.1 6.8 5.5 0.0
460 6.3 55.0 9.9 1.3 3.4 22 0.0
575 6.0 41.0 9.4 0.7 2.4 1.8 0.0
Johnson Controls Unitary Products 35
OD Fan
Motors
(each)
Supply
Blower
Motor Size
(Tons)
Pwr
Exh
Motor MCA1
(Amps)
090
(7.5)
078
(6.5)
Pwr
Conv
Outlet
102
(8.5)
MCA1
w/Pwr
Exh
(Amps)
Max Fuse2/
Breaker3
Size
(Amps)

18.9 37.5

50.0 70.8

6.8 13.5

18.0 25.5

18.9 37.5

50.0 70.8

10.8 21.7

28.9 40.9

18.9 37 5

50.0 708

6.8 13.5

18.0 25.5

6.8 13.5
180
255

9.0 180
240

34.0 21 7

43.3 57 7

81.8 10.8
21 7
289

40.9 21.7

43.3 57 7

81.8 21.7

43.3 57.7

81.8 8.7

17.3 23 1

32.7 9.0

18.0 24.0

34.0 8.7

17.3 23.1

32.7 10.8
21 7

28.9 40.9
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36

8.7 17 3

23.1 32.7

9.0 180
24 0
34 0

9.0 18.0

24.0 34.0

9.0 18.0
24 0
34 0

9.0 18.0

24.0 34.0
90 18 0

24.0 34.0
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2

9.0 18 0
24 0

34.0 9.0
18 0
24 0

34.0 39.8

63.4 86.6
102.2
128.3
398
66 8

93.9 111.9
142 0
186
322
45 7
54 7
69 7

14.3 252

36.0 43.2

55.2 40.2

63.8 87.1
102.7
128.7

40.2 67.3

94.4 112.4
142.5

19.1 32.6

46.1 55.2

70.2 14.1
24 9
35 8
43 0

55.0 436
672

90.5 106 1
132 1
436
70 7
97 8
115 8
145 9
20 1
336
472
562

71.2 17.2
280
389
46 1
58 1
50 70
90 110
150
50 70
100
125
150
20 35
50 60
70 15
30 40
45 60
50 70
90 110
150
50 70
100
125
150
25 35
50 60
80 15
25 40
45 60
50 70
100
110
150
50 80
100
125
150
25 35
50 60
80 20
30 40
50 60
1 2
2 2

45.3 68.9

92.1 107.7
133.8
453

72.3 99.4
117.4
1475

20.8 34 4

47.9 56.9

71.9 16.1

27.0 37.8

45.0 57.0

45.7 69.3

92.6 108.2
134.2

45.7 72.8

99.9 117.9
148.0
21 3

34.8 48.3

57.4 72.4
159

26.7 37.6
44 8
568
49 1

72.7 960
111.6
137.6

49.1 762
103.3
121.3
151 4

22.3 35.8
49 4
584
734

19.0 29.8
407

47.9 599
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
Max Fuse1/
Breaker3
Size w/
Pwr Exh
(Amps)
50 70
100
110
150
50 80
100
125
150
25 35
50 60
80 20
30 40
45 60
50 70
100
110
150
50।
80 100
125
150
25 35
50 60
80 20
30 40
45 60
60 80
100
125
150
60 80
110
125
175
25 40
50 60
80 25
30 45
50 60
Compressors
(each)
528195- YTG-L-1014
XP078-150 Standard Motor - Without Powered Convenience Outlet (Continued) Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 16.0 110.0 24.9 2.1 6.8 5.5 0.0
230 16.0 110.0 24.9 2.1 6.8 5.5 0.0
460 7.8 52.0 12.1 1.3 3.4 22 0.0
575 5.7 38.9 8.9 0.7 2.4 1.8 00
208 224 149.0 35.0 2.1 96 5.5 0.0
230 224 149.0 35.0 2.1 96 5.5 0.0
460 10.6 75.0 16.5 1.3 47 22 0.0
575 7.7 54.0 12.0 0.7 3.6 1.8 0.0
36 Johnson Controls Unitary Products
Supply
Blower
Motor
120
(10)
OD Fan
Motors
(each)
Pwr
Exh
Motor Size
(Tons)
150
(12.5)
MCA1
(Amps)
Pwr
Conv
Outlet
MCA1
w/Pwr
Exh
(Amps)
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
Max Fuse2/
Breaker3
Size
(Amps)

13.5 18.0

25.5 40.6

13.5 180

25.5 40.6

1. Minimum Circuit Ampacity.

2. Dual Element, Time Delay Type

3. HACR type per NEC.

43.3 57.7

81.8 129.9

21.7 28.9

40.9 65.0

18.0 24.0
340

54.0 18.0
24 0

34.0 54.0

37.5 50.0

70.8 112.7

43.3 57.7

81.8 129.9
21 7
289

40.9 65.0

37.5 50.0

70.8 112.7

52.5 99.3
115.0
141 d
156.2

52.5 1066
124.7
1547
1547

25.7 52.7

61.8 768
768

18.3 40.0
472

59.2 59.2
739
120.7
136.4
162.4
162.4

73.9 128.0
146.1
176.1
176.1

35.8 62.9

71.9 86.9

86.9 25.4

47.0 54.2

66.3 663
17 3

23.1 32.7

52.0 17.3
23 1

32.7 52.0
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54

18.0 24.0
34 0

54.0 18.0
240

34.0 54 0

47.0 93.8
109.5
135.5
149.4

47.0 101.1
119.2
1492
1492
23 5

50.5 596
746
746
16 5
382

45.4 57.4

57.4 68.4
115.2
130.9
156.9
156.9

68.4 122.5
140.6
170.6
170.6

33.6 60.7

69.7 84.7

84.7 23.6

45.2 524

64.5 64.5
60 100
110
150
150
60 110
125
150
150
30 60
60 80
80 20
40 50
60 60
90 125
150
175
175
90 125
150
175
175
40 70
70 90
90 30
50 60
70 70

18.0 24.0

34.0 54.0

18.0 24.0

34.0 54.0
Max Fuse1/
Breaker3
Size w/
Pwr Exh
(Amps)
60 100
125
150
175
60 110
125
175
175
30 60
70 80
80 20
40 50
60 60
90 125
150
175
175
90 150
150
200
200।
45 70
80 90
90 30
50 60
70 70
Compressors
(each)
528195-YTG-L-1014
XP078-150 Hi Static Motor - Without Powered Convenience Outlet Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 13.5 88.0 21.1 2 1 6.8 5.5 0.0
230 13.5 88.0 21 1 2.1 6.8 5.5 0.0
460 6.0 44.0 9.3 1.3 3.4 22 0.0
575 4.9 34.0 7.7 0.7 2.4 1.8 00
208 13.7 83.1 21.4 2.1 9.6 5.5 0.0
230 13.7 83.1 21.4 2.1 96 5.5 0.0
460 6.2 41.0 9.7 1.3 47 22 0.0
575 4.8 33.0 7.5 0.7 3.6 1.8 0.0
208 14.5 98.0 226 2.1 9.6 5.5 0.0
230 14.5 98.0 226 2.1 9.6 5.5 0.0
460 6.3 55.0 9.9 1.3 47 22 0.0
575 6.0 41.0 9.4 0.7 3.6 1.8 0.0
Johnson Controls Unitary Products 37
Supply
Blower
Motor
OD Fan
Motors
(each) Size
(Tons)
MCA1
(Amps)
MCA1
w/Pwr
Exh
(Amps)
078
(6.5)
Max Fuse2/
Breaker3
Size
(Amps)
090
(7.5)
102
(8.5)
Pwr
Conv
Outlet
Pwr
Exh
Motor

18.9 37.5

50.0 70.8

6.8 13.5

18.0 25.5

6.8 13.5
180

25.5 18.9

37.5 50.0

70.8 8.7

17.3 23.1

32.7 18.9

37.5 50.0
708

6.8 135
180

25.5 8.7

17.3 23.1

32.7 108

21.7 289

40.9 21.7
433

57.7 81.8
87 17.3

23.1 32.7

9.0 18.0

24.0 34.0

21.7 43.3
577
81 8

21.7 43.3

57.7 81.8

9.0 18.0

24.0 34.0

9.0 18.0

24.0 34.0

10.8 21.7

28.9 40.9
10 8

21.7 28.9

40.9 9.0

18.0 24.0

34.0 9.0
180

24.0 34.0

9.0 18.0
240

34.0 9.0
180

24.0 34.0

9.0 180

24.0 34.0
1 2
2 2
50 70
90 110
150
50 70
100
125
150
25 35
50 60
80 15
30 40
45 60
50 70
100
110
150
50 80
100
125
150
25 35
50 60
80 20
30 40
45 60
60 70
100
110
150
60 80
110
125
150
25 35
50 60
80 20
30 45
50 60
1 2
2 2
1 2
2 2
1 2
2 2

41.4 65.0

88.2 103.8
129.9

41.4 68.4

95.5 113.5
1436

19.4 33 0

46.5 55.5

70.5 14.7
256

36.4 436

55.6 44.6

68.2 91.5
107.1
133.1

44.6 71.7

98.8 116.8
146.9
21 2

34.7 48.2

57.3 72 3

15.7 26 5

37.4 44.6

56.6 46.4

70.0 93 3
108 9
134 9

46.4 73.5
1006
1186
148 7

21.4 349
48 5

57.5 72.5

18.4 29.2

40.1 47.3
59 3

9.0 18.0

24.0 34.0
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
Compressors
(each)

46.9 70.5

93.7 109.3
135.4

46.9 73.9
101.0
119.0
149 1
21 6

35.2 48 7

57.7 72 7
16 5
274

38.2 45.4

57.4 50.1

73.7 97.0
112.6
138.6

50.1 77.2
104.3
122.3
152.4

23.4 36.9

50.4 59.5

74.5 17.5

28.3 39.2
464
584

51.9 75 5
98 8
1144
1404

51.9 79 0
106 1
124 1
1542
236
37 1

50.7 59 7
74 7
202

31.0 41 9
49 1
61 1
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
EC9
E18
E24
E36
None
EC9
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
Max Fuse2/
Breaker3
Size w/ Pwr
Exh
(Amps)
60 80I
100
110
150
60 80 1
110
125
150
25 40
50 60
80 20
30 40
50 60
60 80
100
125
150
60 80
110
125
175
25 40
60 60
80 20
30 40
50 60
60 80
100
125
150
60 80
110
125
175
25 40
60 60
80 25
35 45
50 70
528195- YTG-L-1014
XP078-150 Hi Static Motor - Without Powered Convenience Outlet (Continued) Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 16.0 110.0 24.9 2.1 9.6 5.5 0.0
230 16.0 110.0 24.9 2.1 9.6 5.5 0.0
460 7.8 520 12.1 1.3 4.7 22 00
575 5.7 38.9 8.9 0.7 3.6 1.8 00
208 224 149.0 35.0 2.1 14.0 5.5 0.0
230 22.4 149.0 35.0 2.1 14.0 5.5 0.0
460 10.6 75.0 16.5 1.3 6.6 22 0.0
575 7.7 54.0 12.0 0.7 52 1.8 0.0
38 Johnson Controls Unitary Products
Supply
Blower
Motor
120
(10)
OD Fan
Motors
(each) Size
(Tons)
150
(12.5)
Max Fuse2/
Breaker3
Size
(Amps)
MCA1
(Amps)
MCA1
w/Pwr
Exh
(Amps)
Pwr
Conv
Outlet
Pwr
Exh
Motor

1. Minimum Circuit Ampacity.

2. Dual Element, Time Delay Type

3. HACR type per NEC.
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2

13.5 18.0

25.5 40.6

13.5 180

25.5 40.6
2 2
2 2

43.3 57.7
81 8
1299

43.3 577

81.8 129.9

17.3 23.1

32.7 52.0

18.0 24.0

34.0 54.0

18.0 240

34.0 54.0
21 7
289

40.9 65.0

17.3 23 1

32.7 52.0

21.7 28.9

40.9 65.0

49.8 96.6
112.3
138.3
152.9

49.8 103.9
122.0
152 0
152 0
24 8

51.8 60.9
75 9
759
177

39.4 466

58.6 58.6

72.8 119.6
135.3
161.3
161.3

72.8 126.9
145.0
175.0
175.0

35.5 62.6

71.6 86.6

86.6 252

46.8 54.0

66.1 66.1

18.0 24.0

34.0 54.0

18.0 24.0

34.0 54.0

55.3 102.1
117.8
143.8
159.7

55.3 109.4
127.5
157 5
157 5
27 0

54.0 63 1
78 1
78 1
19 5
41 2

48.4 60.4

60.4 78.3
125.1
140.8
166.8
166.8

78.3 132.4
150.5
180.5
180.5

37.7 64.8

73.8 88.8

88.8 27.0

48.6 55.8

67.9 67.9
60 100
125
150
175
60 110
125
175
175
30 60
70 80
80 20
40 50
60 60
90 125
150
175
175
90 150
150
175
175
45 70
80 90
90 30
50 60
70 70

37.5 50.0

70.8 112.7

37.5 500

70.8 112.7

18.0 24.0
340
540

18.0 240

34.0 54.0
Compressors
(each)
Max Fuse2/
Breaker3
Size w/ Pwr
Exh
(Amps)
70 110
125
150
175
70 110
150
175
175
30 60
70 80
80 25
45 50
70 70
100
150
150
175
175
100
150
175
200
200
45 70
80 90
90I
30 50
60 70
70 None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
528195-YTG-L-1014
XP078-150 Standard Motor -With Powered Convenience Outlet Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 13.5 88.0 21.1 2 1 5.2 5.5 10.0
230 13.5 88.0 21 1 2.1 5.2 5.5 100
460 6.0 44.0 9.3 1.3 26 22 5.0
575 4.9 34.0 7.7 0.7 2.0 1.8 40
208 13.7 83.1 21.4 2.1 5.2 5.5 10.0
230 13.7 83.1 21.4 2.1 52 5.5 100
460 6.2 41.0 9.7 1.3 26 22 5.0
575 4.8 33.0 7.5 0.7 20 1.8 4.0
208 14.5 98.0 226 2.1 6.8 5.5 100
230 14 5 98.0 226 2.1 6.8 5.5 100
460 6.3 55.0 9.9 1.3 3.4 22 5.0
575 6.0 41.0 9.4 0.7 2.4 1.8 4.0
Johnson Controls Unitary Products 39
Supply
Blower
Motor
OD Fan
Motors
(each) Size
(Tons)
MCA1
(Amps)
078
(6.5)
MCA1
w/Pwr
Exh
(Amps)
090
(7.5)
102
(8.5)
Pwr
Conv
Outlet
Pwr
Exh
Motor

18.9 37.5

50.0 70.8
Max Fuse2/
Breaker3
Size
(Amps)

6.8 13.5

18.0 25.5

6.8 13.5
180

25.5 6.8
135
180

25.5 8.7

17.3 23.1

32.7 18.9

37.5 50.0
708
87 17.3

23.1 32.7

18.9 37.5

50.0 70.8

8.7 17.3
23 1
327

9.0 18.0

24.0 34.0

21.7 43.3
577
81 8
108

21.7 289

40.9 21.7
433

57.7 81.8

21.7 43.3

57.7 81.8

9.0 18.0

24.0 34.0

9.0 18.0

24.0 34.0

10.8 21.7

28.9 40.9
10 8

21.7 28.9

40.9 9.0

18.0 24.0

34.0 9.0

18.0 24.0

34.0 49.8

73.4 96.6
112.2
138.3

49.8 76.8
103.9
121.9
152.0
23 6
372
507

59.7 747

18.3 29.2

40.0 472

59.2 50.2

73.8 97.1
112.7
138.7

50.2 77.3
104.4
122.4
152.5

24.1 37.6

51.1 60.2

75.2 18.1
289

39.8 47 0
59 0

53.6 772
100.5
116 1
142.1

53.6 80 7
107.8
125.8
155.9
25 1
386

52.2 61 2
762
21 2
320
42 9

50.1 62 1

9.0 18.0
240

34.0 9.0
180

24.0 34.0

9.0 18.0

24.0 34.0
60 80
100
125
150
60 80
110
125
175
25 40
60 60
80 20
30 40
50 60
60 80
100
125
150
60 80
110
125
175
30 40
60 70
80 20
30 40
50 60
60 80
110
125
150
60 90
110
150
175
30 40
60 70
80 25
35 45
60 70

9.0 18.0

24.0 34.0
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2
1 2
2 2

55.3 78.9
102.1
1177
143.8

55.3 82.3
1094
1274
157.5

25.8 39.4

52.9 61 9

76.9 20 1

31.0 41.8

49.0 61.0

55.7 79.3
102.6
1182
144.2

55.7 82.8
109.9
127.9
158.0

26.3 39.8

53.3 62.4

77.4 19.9

30.7 41.6

48.8 60.8
59 1

82.7 106.0
121.6
147.6
59 1

86.2 113.3
131 3
161 4
273

40.8 54.4

63.4 78.4

23.0 338

44.7 51.9

63.9 Compressors
(each)
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
None
EC9
E18
E24
E36
None
EC9
E18
E24
E36
None
E09
E18
E24
E36
None
E09
E18
E24
E36
Max Fuse2/
Breaker3
Size w/ Pwr
Exh
(Amps)
60 80I
110
125
150
60 !90I
110
150
175
30 40
60 70
80 25
35 45
50 70
60 80
110
125
150
60 90
110
150
175
30I
40 60
70 80
20I
35 45
50 70
70 90
110
125
150
70 90
125
150
175
30 45
60 70
80 25
35 45
60 70
528195- YTG-L-1014
XP078-150 Standard Motor - With Powered Convenience Outlet (Continued) Electric Heat Option
Volt
RLA LRA MCC FLA FLA FLA FLA Model kW Stages Amps
208 16.0 110.0 24.9 2.1 6.8 5.5 10.0
230 16.0 110.0 24.9 2.1 6.8 5.5 10.0
460 7.8 520 12.1 1.3 3.4 22 5.0
575 5.7 38.9 8.9 0.7 2.4 1.8 4.0
208 224 149.0 35.0 2.1 96 5.5 10.0
230 22.4 149.0 35.0 2.1 96 5.5 100
460 10.6 75.0 16.5 1.3 47 22 5.0
575 7.7 54.0 12.0 0.7 3.6 1.8 4.0
40 Johnson Controls Unitary Products
Supply
Blower
Motor
120
(10)
OD Fan
Motors
(each) Size
(Tons)
150
(12.5)
MCA1
(Amps)
MCA1
w/Pwr
Exh
(Amps)
Pwr
Conv
Outlet
Pwr
Exh
Motor
Max Fuse2/
Breaker3
Size
(Amps)

1. Minimum Circuit Ampacity.

2. Dual Element, Time Delay Type

3. HACR type per NEC.
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2

13.5 18.0

25.5 40.6

13.5 180

25.5 40.6
2 2
2 2

43.3 57.7
81 8
1299

43.3 577

81.8 129.9

17.3 23.1

32.7 52.0

18.0 24.0

34.0 54.0

18.0 240

34.0 54.0
21 7
289

40.9 65.0

17.3 23 1

32.7 52.0

21.7 28.9

40.9 65.0

18.0 24.0
340
540

18.0 24.0

34.0 54.0

37.5 50.0

70.8 112.7

37.5 500

70.8 112.7

18.0 24.0
340
540
70 110
125
150
175
70 125
150
175
175
35 60
70 80
80 25
45 50
70 70
100
150
150
175
175
100
150
175
200
200
45 70
80 90
90 35
50 60
70 70

18.0 24.0

34.0 54.0
Compressors
(each)

57.0 103.8
119.5
145.5
161.9

57.0 111.1
129.2
159.2
159.2
28 5

55.5 64.6
796
796

20.5 422

49.4 61 4

61.4 78.4
125.2
140.9
166.9
166.9

78.4 132.5
150.6
180.6
180.6

38.6 65.7

74.7 89.7

89.7 27.6

49.2 56.4

68.5 68.5
Max Fuse2/
Breaker3
Size w/ Pwr
Exh
(Amps)
70 110
125
175
175
70 125
150
175
175
35 60
70 90
90 25
45 60
70 70
100
150
150
175
175
100
150
175
200
200
50 70
80 100
100
35 60
60 80
80 None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54
None
E18
E24
E36
E54

62.5 109.3
125.0
151.0
168.7

62.5 116.6
134.7
164.7
164.7

30.7 57.7
668

81.8 81.8

22.3 44.0

51.2 63.2

63.2 83.9
130.7
146.4
172.4
172.4

83.9 138.0
156.1
186.1
186.1

40.8 67.9

76.9 91.9

91.9 29.4

51.0 58.2

70.3 70.3
Provided By Applicant
Ambiant Ambiant 64.5
Dryers Dryers 94.2
Ambiant 59.2Dryers 90.5Ambiant 58.1Dryers 88.1Ambiant 55.5Dryers 86.4 Settings were as follows: 40 ~ 90 dB range, "A" weighting mode, FAST (High Speed) modeAll sound measurements below were taken with a VLIKE Model - VL6708 digital sound level meter. 30'
Sound Data
56 55.6 55.4 0'
30'

76.2 4 Sons No. 509 Chevron Express Wash
1446 E. Chandler Blvd. Phoenix, AZ 85048
DRYERS
QTY-8 MACNEIL TECH 21 15HP DRYERS
10'20'
Tunnel Exit
20' 10'

78.4 82.6
Summary
File Name on Meter LxT_Data.001
File Name on PC
Serial Number 0005426
Model SoundTrack LxT®
Firmware Version 2.302
User IG
Location Chino
Job Description All American Car Wash
Note
Measurement
Description
Start 2019-09-21 11:13:10
Stop 2019-09-21 11:16:12
Duration 00:03:01.5
Run Time 00:03:01.5
Pause 00:00:00.0
Results
dB Time Stamp
Leq 64.3
LS(max) 69.1 2019/09/21 11:14:23
LS(min) 62.6 2019/09/21 11:14:52
LPeak(max)
Statistics
LAS2.00 66.8 dB
LAS8.00 65.4 dB
LAS25.00 64.3 dB
LAS50.00 64.0 dB
LAS66.60 63.8 dB
LAS90.00 63.4 dB
SLM_0005426_LxT_Data_001.05.ldbin
A
Sheet of
Date: aql2 2010 Start: A1‘/AA“End:

Site Location: (/W 61 U&cu A
Primary Noise Source:
2 wW
Measurement Results
Time dBA
S&
SC(A o !
Data File: 009 L Photos:
241/
Matv C__ b(o/
Temperature (F) Relative Humidity (%)
Comments:

Traffic Description:

Roadway # Lanes Posted Speed Autos MD HD
Leq
Lmax
Lmin
Lpeak
L2
L8
L25
L50

SEL/CNEL
Max Wind Velocity
(knots/hr)

62.6 64L

60.4 60.0
60 7
Go
ject Number: A PE -6\
.oject Name:

Monitorin? Personnel: t
Site Number: 4000
Average Wind Velocity
(knots/hr)
dBA

60.2 C6/
<84
Comments/Wall Heights: olkedUccenLS
_ _ ____ _ “ C b(oe 4
Observed Noise Sources/Events
Noise Source Event
MUs_[o auuoooo -dob
M *1
KKo
Summary
File Name on Meter L-T_Data.011
File Name on PC
Serial Number 0005427
Model SoundTrack LxT®
Firmware Version 2.302
User IG
Location Drive Thru
Job Description Speaker Box
Note
Measurement
Description
Start 2019-03-21 12:30:19
Stop 2019-03-21 12:30:23
Duration 00:00:03.7
Run Time 00:00:03.7
Pause 00:00:00.0
Overall Settings
RMS Weight A Weighting
Peak Weight A Weighting
Detector Slow
Preamp PRMLxT1
Microphone Correction Off
Integration Method Linear
Overload 146.6 dB
Results
dB Time Stamp
Leq 72.3
LS(max) 76.0 2019/03/21 12:30:19
LS(min) 70.4 2019/03/21 12:30:20
LPeak(max) 91.2 2019/03/21 12:30:20
# Overloads 0
Overload Duration 0.0 s
Statistics
LAS2.00 75.7 dB
LAS8.00 75.5 dB
LAS25.00 74.8 dB
LAS50.00 73.6 dB
LAS66.60 72.4 dB
LAS90.00 71.1 dB
SLM_0005427_L-T_Data_011.00.ldbin
A

Appendix H
Transportation Analysis and Vehicle Miles Traveled
(VMT) Analysis

Kimley»Horn

Appendix H-1
Transportation Analysis

Klmley^HOrn
Prepared for:
535 Anton Blvd. Suite 850
Costa Mesa. CA. 92626
Prepared by:
23905 Clinton Keith Road, 114-280
Wildomar, CA 92595
May 2026
Riverview Market
Transportation Analysis
DJM
Where People Theive
2/0. o-G
19O
I
6-30-26 *
%7areS7 FOFCAY”

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
OFESS/On, sce3CHo,G /o C
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
i

EXECUTIVE SUMMARY
Purpose of the Report
The purpose of this Transportation Analysis (TA) is to update the previously approved SWC Rosedale & Coffee Traffic Study dated January 2023. This TA reflects revisions to the proposed site land uses, utilizes the latest Kern Council of Governments (Kern COG) regional transportation model, utilizes the updated ITE Trip Generation Manual (12th Edition), and includes updated traffic count data. The objective of this analysis is to identify and document potential traffic deficiencies associated with the proposed Riverview Market project in the City of Bakersfield. Where applicable, this report also recommends transportation improvements to mitigate project related impacts to local and regional transportation facilities.

Project Overview
The proposed project involves the construction and operation of the Riverview Market (the “Project”), which will include the land uses and associated square footages described below. The Project is proposed to be developed in two phases, as follows:

Phase I
• 244,417 square feet (sf) of shopping center (retail & restaurant with no drive-thru) • 9,129 sf of medical office
• 16,884 sf of fast-food restaurant with drive through window • Gasoline service station with 40 vehicle fueling positions and no convenience store • 4,100 sf of automated carwash with 1 service tunnel
• 40,000 sf self-storage space
Phase II
• 89,818 sf of shopping center (retail & restaurant with no drive-thru) The traffic analysis presented in this study is based on land use intensities that reflect only those components of the project expected to generate vehicular trips. Ancillary building areas such as electrical rooms, fire riser rooms, and similar utility or service spaces totaling approximately 1,949 square feet have been excluded from the intensity calculations, as they do not function as trip-generating uses. Accordingly, the trip generation estimates, and subsequent traffic impact findings are not influenced by these non-occupiable, support-oriented areas, and instead focus solely on the portions of the development that contribute to travel demand.

The project trip generation was calculated using the ITE Trip Generation Manual (12 th Edition). It is
estimated that the project will generate 13,185 total daily trips, 676 AM peak hour trips and 1,183 PM peak hour trips. Project trip distribution and assignment were developed, in coordination with City staff, based on the land use characteristics of the proposed project and surrounding area, existing travel patterns within the study area, anticipated travel patterns to and from the project site, and approved projects located in the vicinity of the project site. Project scenarios and study area were then established in coordination with City staff to determine the potential project deficiencies on the transportation network.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
ii
Project Scenarios:
• Existing Conditions (Year 2025)
• Year 2027 Cumulative Conditions
• Year 2027 Cumulative + Project Phase I Conditions
• Year 2028 Cumulative Conditions
• Year 2028 Cumulative + Project Phases I & II Conditions • Buildout Year (based on current KCOG model) Conditions (Year 2046) • Buildout Year (based on current KCOG model) + Project Phases I & II Conditions (Year 2046) Study Area Intersections:

1. Patton Way and Rosedale Highway (CA-58)

2. Coffee Road and Rosedale Highway (CA-58)

3. Northwest Promenade/Project Driveway and Rosedale Highway (CA-58)

4. El Toro Viejo Road/Clay Patrick Farr Way and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

6. Verdugo Lane and Rosedale Highway (CA-58)

7. Old Farm Road and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

9. Harvest Creek Road and Brimhall Road – not collector

10. Calloway Drive and Brimhall Road

11. Verdugo Lane and Brimhall Road

12. Jewetta Avenue and Brimhall Road

13. Old Farm Road and Brimhall Road

14. Allen Road and Brimhall Road

15. Coffee Road and Olive Drive

16. Coffee Road and Hageman Road

17. Coffee Road and Riverlakes Drive/Meany Avenue

18. Coffee Road and Downing Avenue

19. Coffee Road and Granite Falls Drive

20. Coffee Road and Jet Way/Project Driveway

21. Coffee Road and Westside Parkway EB Ramps

22. Coffee Road and Truxtun Avenue

23. Coffee Road/Gosford Road and Stockdale Highway

24. Calloway Drive and Noriega Road

25. Calloway Drive and Hageman Road

26. Callaway Drive and Meacham Road
Study Area Roadway Segments:

1. Rosedale Highway (CA-58) between Old Farm Road and Verdugo Lane

2. Rosedale Highway (CA-58) between Verdugo Lane and Calloway Drive

3. Rosedale Highway (CA-58) between Calloway Drive and El Toro Viejo Road/Clay Patrick Farr Way

4. Rosedale Highway (CA-58) between El Toro Viejo Road/Clay Patrick Farr Way and Project Driveway/Northwest Promenade

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
iii

5. Rosedale Highway (CA-58) between Project Driveway/Northwest Promenade and Coffee Road

6. Rosedale Highway (CA-58) between Coffee Road and Patton Way

7. Coffee Road between Olive Drive and Hageman Road

8. Coffee Road between Hageman Road and Meany Avenue/Riverlakes Drive

9. Coffee Road between Meany Avenue/Riverlakes Drive and Downing Avenue

10. Coffee Road between Downing Avenue and Granite Falls Drive

11. Coffee Road between Granite Falls Drive and Rosedale Highway (CA-58)

12. Coffee Road between Rosedale Highway (CA-58) and Project Driveway/Jet Way

13. Coffee Road between Project Driveway/Jet Way and Brimhall Road

14. Coffee Road between Brimhall Road and Westside Parkway EB Ramps

15. Coffee Road between Westside Parkway EB Ramps and Truxtun Road

16. Coffee Road between Truxtun Road and Stockdale Highway

17. Calloway Drive between Noriega Road and Hageman Road

18. Calloway Drive between Hageman Road and Meacham Road

19. Calloway Drive between Meacham Road and Rosedale Highway (CA-58)

20. Calloway Drive between Rosedale Highway (CA-58) and Brimhall Road

21. Brimhall Road between Allen Road and Old Farm Road

22. Brimhall Road between Old Farm Road and Jewetta Avenue

23. Brimhall Road between Jewetta Avenue and Verdugo Lane

24. Brimhall Road between Verdugo Lane and Calloway Drive

25. Brimhall Road between Calloway Drive and Harvest Creek Road

26. Brimhall Road between Harvest Creek Road and Coffee Road

27. Hageman Road between Calloway Drive and Coffee Road Analysis Results and Recommended Improvements
Existing Conditions (Year 2025) Scenario
Intersections
All analyzed intersections are operating at an acceptable LOS under Existing Year 2025 scenario except for the following intersections:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

9. Coffee Road/Gosford Road and Stockdale Highway

23. Coffee Road/Gosford Road and Stockdale Highway
Roadway Segments
All analyzed roadway segments are operating at an acceptable LOS under Existing year 2025 scenario except for the following roadway segments:

23. Coffee Road between Truxtun Road and Stockdale Highway

24. Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road Year 2027 Cumulative Scenario

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
iv
Intersections
All analyzed intersections are operating at an acceptable LOS under Year 2027 Cumulative scenario except for the following intersections:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway
The deficient intersection locations with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

Roadway Segments
All roadway segments analyzed are operating at an acceptable LOS under Year 2027 Cumulative Conditions except at the following locations:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the Metropolitan Bakersfield General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program. The project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

Year 2028 Cumulative Scenario
Intersections
All analyzed intersections are operating at an acceptable LOS under Year 2028 Cumulative scenario except for the following:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
v
The deficient intersection locations with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

Roadway Segments
The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the Metropolitan Bakersfield General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program. The project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

Buildout Year 2046 Scenario
Intersections
All analyzed intersections are operating at an acceptable LOS under Buildout Year 2046 scenario except for the following:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway

31. Coffee Road & Project Dwy F

32. Coffee Road & Project Dwy H
Deficient roadway intersections 2, 5, 8, and 23 with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

Project driveways intersections 31 and 32 would improve with installation of traffic signals; however, a traffic signal is not warranted at either location. Therefore, no improvements are recommended.

Roadway Segments
All analyzed roadway segments are operating at an acceptable LOS under Buildout Year 2046 Conditions except at the following locations:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Brimhall Road to Westside Parkway EB Ramps • Coffee Road between Westside Parkway EB Ramps to Truxtun Road

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Executive Summary
vi
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the Metropolitan Bakersfield General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program. The project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Table of Content
i
Table of Contents
EXECUTIVE SUMMARY...............................................................................................................................................I Purpose of the Report.....................................................................................................................................i Project Overview.............................................................................................................................................i Analysis Results and Recommended Improvements.....................................................................................iii

1.0 PROJECT INTRODUCTION .............................................................................................................................. 1 PROJECT DESCRIPTION .............................................................................................................................................1 STUDY AREA ..........................................................................................................................................................2 PROJECT TRIP GENERATION.......................................................................................................................................3 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT.............................................................................................................6 PROJECT ACCESS .....................................................................................................................................................8 PARKING ...............................................................................................................................................................8

2.0 METHODOLOGIES ......................................................................................................................................15 STUDY SCENARIOS.................................................................................................................................................15 TRAFFIC VOLUME DEVELOPMENT..............................................................................................................................15 ANALYSIS METHODOLOGIES ....................................................................................................................................15 Intersection Capacity Analysis.....................................................................................................................16 Signalized Intersections...........................................................................................................................16 Roadway Segments .....................................................................................................................................17 City of Bakersfield General Plan Compliance...............................................................................................17

3.0 EXISTING CONDITION (YEAR 2025) SCENARIO ..................................................................................................19 ROADWAY NETWORK.............................................................................................................................................19 TRANSIT SYSTEM...................................................................................................................................................19 ACTIVE TRANSPORTATION SYSTEM ............................................................................................................................20 TRAFFIC VOLUMES ................................................................................................................................................20 ANALYSIS RESULTS ................................................................................................................................................20

4.0 YEAR 2027 CUMULATIVE CONDITIONS ............................................................................................................29 INTERSECTION ANALYSIS RESULTS .............................................................................................................................29 INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS .................................................................................32 ROADWAY SEGMENT CAPACITY ANALYSIS RESULTS .......................................................................................................32 ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS........................................................................32

5.0 YEAR 2028 CUMULATIVE CONDITIONS ............................................................................................................39 INTERSECTION ANALYSIS RESULTS .............................................................................................................................39 INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS.................................................................................42 ROADWAY SEGMENT ANALYSIS RESULTS ....................................................................................................................42 ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS........................................................................42

6.0 BUILDOUT YEAR 2046 CONDITIONS................................................................................................................49 INTERSECTION ANALYSIS RESULTS .............................................................................................................................49 INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS .................................................................................52 ROADWAY SEGMENT ANALYSIS RESULTS ....................................................................................................................52 ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS........................................................................53

7.0 RECOMMENDED IMPROVEMENTS ...................................................................................................................60

8.0 VEHICLE MILES TRAVELED.............................................................................................................................62

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Table of Content
ii
SB 743...............................................................................................................................................................62 VMT ANALYSIS GUIDELINES....................................................................................................................................62 VMT ANALYSIS ....................................................................................................................................................62 List of Figures
FIGURE 1-1 – PROJECT SITE PLAN ..................................................................................................................................9 FIGURE 1-2 – PROJECT STUDY AREA .............................................................................................................................10 FIGURE 1-3A – PROJECT AM/PM PEAK HOUR INTERSECTION VOLUMES – PHASE I...............................................................11 FIGURE 1-3B – PROJECT AM/PM PEAK HOUR INTERSECTION VOLUMES – PHASE I...............................................................12 FIGURE 1-4A – PROJECT AM/PM PEAK HOUR INTERSECTION VOLUMES – PHASES I & II .......................................................13 FIGURE 1-4B – PROJECT AM/PM PEAK HOUR INTERSECTION VOLUMES – PHASES I & II.......................................................14 FIGURE 3-1 – CITY OF BAKERSFIELD GENERAL PLAN CIRCULATION NETWORK .......................................................................26 FIGURE 3-2A – EXISTING YEAR 2025 AM/PM PEAK HOUR INTERSECTION VOLUMES............................................................27 FIGURE 3-2B – EXISTING YEAR 2025 AM/PM PEAK HOUR INTERSECTION VOLUMES............................................................28 FIGURE 4-1A – YEAR 2027 CUMULATIVE AM/PM PEAK HOUR INTERSECTION VOLUMES ......................................................35 FIGURE 4-1B – YEAR 2027 CUMULATIVE AM/PM PEAK HOUR INTERSECTION VOLUMES ......................................................36 FIGURE 4-2A – YEAR 2027 WITH PROJECT PHASE I AM/PM PEAK HOUR INTERSECTION VOLUMES ........................................37 FIGURE 4-2B – YEAR 2027 WITH PROJECT PHASE I AM/PM PEAK HOUR INTERSECTION VOLUMES ........................................38 FIGURE 5-1A – YEAR 2028 CUMULATIVE AM/PM PEAK HOUR INTERSECTION VOLUMES ......................................................45 FIGURE 5-1B – YEAR 2028 CUMULATIVE AM/PM PEAK HOUR INTERSECTION VOLUMES ......................................................46 FIGURE 5-2A – YEAR 2028 WITH PROJECT PHASES I-II AM/PM PEAK HOUR INTERSECTION VOLUMES....................................47 FIGURE 5-2B – YEAR 2028 WITH PROJECT PHASES I-II AM/PM PEAK HOUR INTERSECTION VOLUMES....................................48 FIGURE 6-1A – BUILDOUT YEAR 2046 AM/PM PEAK HOUR INTERSECTION VOLUMES ..........................................................56 FIGURE 6-1B – BUILDOUT YEAR 2046 AM/PM PEAK HOUR INTERSECTION VOLUMES ..........................................................57 FIGURE 6-2A – BUILDOUT YEAR 2046 WITH PROJECT PHASES I-II AM/PM PEAK HOUR INTERSECTION VOLUMES .....................58 FIGURE 6-2B – BUILDOUT YEAR 2046 WITH PROJECT PHASES I-II AM/PM PEAK HOUR INTERSECTION VOLUMES .....................59 List of Tables
TABLE 1-1 PROJECT TRIP GENERATION RATES...................................................................................................................3 TABLE 1-2 PROJECT TRIP GENERATION – PHASE I..............................................................................................................5 TABLE 1-3 PROJECT TRIP GENERATION – PHASES I & II ......................................................................................................6 TABLE 1-4 PROJECT TRIP DISTRIBUTION ..........................................................................................................................6 TABLE 1-5 PROJECT TRIP ASSIGNMENT – ROADWAY SEGMENTS...........................................................................................7 TABLE 2-1 VEHICULAR LEVEL OF SERVICE DEFINITIONS .....................................................................................................16 TABLE 2-2 SIGNALIZED INTERSECTION LEVEL OF SERVICE HCM OPERATIONAL ANALYSIS METHOD............................................16 TABLE 2-3 ROADWAY SEGMENT CAPACITY THRESHOLDS...................................................................................................17 TABLE 3-1 EXISTING YEAR 2025 INTERSECTION OPERATION ANALYSIS ...............................................................................21 TABLE 3-2 EXISTING YEAR 2025 SCENARIO ROADWAY SEGMENT CAPACITY ANALYSIS............................................................23 TABLE 4-1 YEAR 2027 CUMULATIVE SCENARIO INTERSECTION OPERATION ANALYSIS ............................................................30 TABLE 4-2 YEAR 2027 CUMULATIVE SCENARIO ROADWAY SEGMENT CAPACITY ANALYSIS ......................................................33 TABLE 4-3 OPENING YEAR 2027 PROJECT ACCESS VEHICULAR QUEUEING ANALYSIS.............................................................34 TABLE 5-1 YEAR 2028 CUMULATIVE SCENARIO INTERSECTION OPERATION ANALYSIS ............................................................40 TABLE 5-2 YEAR 2028 CUMULATIVE SCENARIO ROADWAY SEGMENT CAPACITY ANALYSIS ......................................................43 TABLE 5-3 OPENING YEAR 2028 PROJECT ACCESS VEHICULAR QUEUEING ANALYSIS.............................................................44 TABLE 6-1 BUILDOUT YEAR 2046 SCENARIO INTERSECTION OPERATION ANALYSIS ................................................................50 TABLE 6-2 BUILDOUT YEAR 2046 WITH IMPROVEMENTS INTERSECTION OPERATION ANALYSIS ...............................................52 TABLE 6-3 BUILDOUT YEAR 2046 SCENARIO ROADWAY SEGMENT CAPACITY ANALYSIS..........................................................54 TABLE 6-4 BUILDOUT YEAR 2046 PROJECT ACCESS VEHICULAR QUEUEING ANALYSIS ...........................................................55 TABLE 7-1 RECOMMENDED IMPROVEMENTS ..................................................................................................................61

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Table of Content
iii
Appendices

APPENDIX A - TRAFFIC VOLUME DEVELOPMENT

APPENDIX B - EXISTING CONDITIONS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX C - YEAR 2027 CUMULATIVE PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX D - YEAR 2027 WITH PROJECT PHASE I PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX E - YEAR 2028 CUMULATIVE PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX F - YEAR 2028 WITH PROJECT PHASES I & II PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX G - BUILDOUT YEAR 2046 PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS APPENDIX H - BUILDOUT YEAR 2046 WITH PROJECT PHASES I, II PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS

APPENDIX I - RECOMMENDED IMPROVEMENTS PEAK HOUR INTERSECTION ANALYSIS WORKSHEETS

APPENDIX J - VEHICULAR QUEUING ANALYSIS

APPENDIX K - TRANSIT INFORMATION

APPENDIX L - VEHICLE MILES TRAVELED

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
1 1.0 PROJECT INTRODUCTION
The purpose of this Transportation Analysis (TA) is to update the previously approved SWC Rosedale & Coffee Traffic Study dated January 2023. This TA reflects revisions to the proposed site land uses, utilizes the latest Kern Council of Governments (Kern COG) regional transportation model, utilizes the updated ITE Trip Generation Manual (12th Edition), and includes updated traffic count data. The objective of this analysis is to identify and document potential traffic deficiencies associated with the proposed Riverview Market project in the City of Bakersfield. Where applicable, this report also recommends transportation improvements to mitigate project related impacts to local and regional transportation facilities.

The Project is proposed to be developed in two phases on an approximately 46-acre site (46.16 net acres). The Project Site consists of a single legal parcel (APN 368-010-05) and is currently undeveloped.

The L-shaped property is generally located along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road (the “Project Site”).

PROJECT DESCRIPTION
The proposed project involves the construction and operation of the Riverview Market (the “Project”), which will include the land uses and associated square footages described below. The Project is proposed to be developed in two phases, as follows:

Phase I
• 244,417 square feet (sf) of shopping center (retail & restaurant with no drive-thru) • 9,129 sf of medical office
• 16,884 sf of fast-food restaurant with drive through window • Gasoline service station with 40 vehicle fueling positions and no convenience store • 4,100 sf of automated carwash with 1 service tunnel
• 40,000 sf self-storage space
Phase II
• 89,818 sf of shopping center (retail & restaurant with no drive-thru) The traffic analysis presented in this study is based on land use intensities that reflect only those components of the project expected to generate vehicular trips. Ancillary building areas such as electrical rooms, fire riser rooms, and similar utility or service spaces totaling approximately 1,949 square feet have been excluded from the intensity calculations, as they do not function as trip-generating uses. Accordingly, the trip generation estimates and subsequent traffic impact findings are not influenced by these non-occupiable, support-oriented areas, and instead focus solely on the portions of the development that contribute to travel demand.

Figure 1-1 shows the project site plan.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
2 STUDY AREA
The study area for this project was developed consistent with the City of Bakersfield Subdivision & Engineering Design Manual (BDM, October 2019). IEG prepared a project Transportation Analysis scoping agreement defining the study area, which was reviewed and approved by City staff prior to the preparation of this technical report.

Figure 1-2 presents the study area that includes the following key locations:

Study Area Intersections:

1. Patton Way and Rosedale Highway (CA-58)

2. Coffee Road and Rosedale Highway (CA-58)

3. Northwest Promenade/Project Driveway and Rosedale Highway (CA-58)

4. El Toro Viejo Road/Clay Patrick Farr Way and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

6. Verdugo Lane and Rosedale Highway (CA-58)

7. Old Farm Road and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

9. Harvest Creek Road and Brimhall Road – not collector

10. Calloway Drive and Brimhall Road

11. Verdugo Lane and Brimhall Road

12. Jewetta Avenue and Brimhall Road

13. Old Farm Road and Brimhall Road

14. Allen Road and Brimhall Road

15. Coffee Road and Olive Drive

16. Coffee Road and Hageman Road

17. Coffee Road and Riverlakes Drive/Meany Avenue

18. Coffee Road and Downing Avenue

19. Coffee Road and Granite Falls Drive

20. Coffee Road and Jet Way/Project Driveway

21. Coffee Road and Westside Parkway EB Ramps

22. Coffee Road and Truxtun Avenue

23. Coffee Road/Gosford Road and Stockdale Highway

24. Calloway Drive and Noriega Road

25. Calloway Drive and Hageman Road

26. Callaway Drive and Meacham Road
Study Area Roadway Segments:

1. Rosedale Highway (CA-58) between Old Farm Road and Verdugo Lane

2. Rosedale Highway (CA-58) between Verdugo Lane and Calloway Drive

3. Rosedale Highway (CA-58) between Calloway Drive and El Toro Viejo Road/Clay Patrick Farr Way

4. Rosedale Highway (CA-58) between El Toro Viejo Road/Clay Patrick Farr Way and Project Driveway/Northwest Promenade

5. Rosedale Highway (CA-58) between Project Driveway/Northwest Promenade and Coffee Road

6. Rosedale Highway (CA-58) between Coffee Road and Patton Way

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
3 7. Coffee Road between Olive Drive and Hageman Road

8. Coffee Road between Hageman Road and Meany Avenue/Riverlakes Drive

9. Coffee Road between Meany Avenue/Riverlakes Drive and Downing Avenue

10. Coffee Road between Downing Avenue and Granite Falls Drive

11. Coffee Road between Granite Falls Drive and Rosedale Highway (CA-58)

12. Coffee Road between Rosedale Highway (CA-58) and Project Driveway/Jet Way

13. Coffee Road between Project Driveway/Jet Way and Brimhall Road

14. Coffee Road between Brimhall Road and Westside Parkway EB Ramps

15. Coffee Road between Westside Parkway EB Ramps and Truxtun Road

16. Coffee Road between Truxtun Road and Stockdale Highway

17. Calloway Drive between Noriega Road and Hageman Road

18. Calloway Drive between Hageman Road and Meacham Road

19. Calloway Drive between Meacham Road and Rosedale Highway (CA-58)

20. Calloway Drive between Rosedale Highway (CA-58) and Brimhall Road

21. Brimhall Road between Allen Road and Old Farm Road

22. Brimhall Road between Old Farm Road and Jewetta Avenue

23. Brimhall Road between Jewetta Avenue and Verdugo Lane

24. Brimhall Road between Verdugo Lane and Calloway Drive

25. Brimhall Road between Calloway Drive and Harvest Creek Road

26. Brimhall Road between Harvest Creek Road and Coffee Road

27. Hageman Road between Calloway Drive and Coffee Road

PROJECT TRIP GENERATION
Trip generation is a measure or forecast of the number of trips that begin or end at the project site.

The traffic generated is a function of the extent and type of development proposed for the site. These trips will result in some traffic increases on the streets where they occur. Per the BDM, project vehicular traffic generation characteristics should be estimated based on established rates contained in the Trip Generation Manual (TGM), 12
th Edition, published by the Institute of Transportation Engineers (ITE). Project ITE average trip generation rates are presented in Table 1-1.

Table 1-1
Project Trip Generation Rates
Land Use1 Units2
ITE LU
Code
AM Peak Hour PM Peak Hour
Daily
In Out Total In Out Total
Shopping Center (>150 TSF) TSF 820 0.62 0.39 1.01 1.72 1.78 3.50 36.39 Medical Office3TSF 720 2.36 0.67 3.03 0.92 2.15 3.07 32.37 Fast Food Restaurant w/ Drive-through
Window TSF 934 16.95 16.29 33.24 16.43 15.17 31.60 448.12 Automated Carwash Tunnel N/A4 34 34 68 57 57 114 1,447
Self-Storage TSF 151 0.05 0.03 0.08 0.07 0.07 0.14 1.29 Gasoline Service Station VFP N/A4 7.12 7.12 14.24 10.25 10.24 20.49 254.91 1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 12th Edition (2025). 2TSF = Thousand Square Feet; VFP = Vehicle Fueling Positions 3Peak hour and daily trip rates for Medical Office use are based on fitted curve equations for total 9,129 sf of medical office proposed for entire project. 4ADT and Peak Hour rates are based on Costco survey data Per ITE TGM, LU 820 Shopping Center typically contains retail merchandising facilities, office space, restaurants, banks and health clubs in both one building or outparcels. However, LU 820 trip

INTEGRATED ENGINEERING GROUP

TRANSPORTAT PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
4 generation rates were only applied to the proposed retail merchandising, bank, and health club uses, and the respective individual use trip generation rates were applied to the proposed restaurant, medical office, gas station with convenience store and carwash uses. These individual rates have higher AM peak hour splits, consistent with the hours of operation of these uses that typically begin prior to the shopping center retail uses and resulting in more conservative approach.

Since individual rates were applied to multiple proposed uses, internal capture rates were calculated based on the procedure presented in NCHRP Report 684, as recommend in the ITE Trip Generation Handbook, 3
rd Edition. This procedure provides AM in, AM out, PM in and PM out internal capture rates for office, retail and restaurant uses. Internal capture rates for daily trips were calculated based on the total PM reduction. ITE land use information and internal capture rate calculations are included in Appendix A.

Tables 1-2 through 1-5 summarize the calculated trip generation based on the land use units associated with the five proposed Project phases. As shown on Table 1-3, the proposed development is anticipated to generate approximately 13,185 total daily trips, 676 AM peak hour trips and 1,183 PM peak hour trips.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
5 Table 1-2
Project Trip Generation – Phase I
Land Use1 Intensity Units2
AM Peak Hour PM Peak Hour Daily
In Out Total In Out Total
Shopping Center (>150) 244.417 TSF 152 95 247 420 436 856 8,894 Pass-by Reduction (29% - PM Peak Hour & Daily)5 0 0 0 122 126 248 2,579 Subtotal 152 95 247 298 310 608 6,315
Medical Office 9.129 TSF 22 6 28 8 20 28 295
Internal Capture (18% - AM In, 83% - AM Out, 50% - PM In, 25% - PM Out, 32% - Daily)4
4 5 9 4 5 9 94
Subtotal 18 1 19 4 15 19 201
Fast Food Restaurant w/ Drive-through Window 16.884 TSF 286 275 561 277 256 533 7,566 Internal Capture (22% - AM In, 15% - AM Out, 29% - PM In, 42% - PM Out, 35% - Daily)4
63 41 104 80 108 188 2,648
Pass-by Reduction (50% - AM Peak Hour, 55% - PM Peak Hour & Daily)5
112 117 229 108 81 189 2,705
Subtotal 111 117 228 89 67 156 2,213
Automated Carwash 1 Tunnel (Costco) 34 34 68 57 57 114 1,447 Internal Trip Capture Shared with Costco Fuel (Per Costco Data Specific)6
22 22 44 40 40 80 1,025
Pass-by Reduction (Per Costco Data)6 8 8 16 12 12 24 295 Subtotal 4 4 8 5 5 10 127
Self-Storage 40 TSF 2 1 3 3 3 6 52
Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily)4
0 0 0 0 0 0 5
Subtotal 2 1 3 3 3 6 47
Gasoline Service Station 40 VFP (Costco) 285 285 570 410 410 820 10,196 Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily)4
23 37 60 41 29 70 816
Pass-by Reduction (Per Costco Data Specific)6 216 214 430 293 292 585 7,316 Subtotal 46 34 80 76 89 165 2,064
Total 333 252 585 475 485 960 10,865
1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 12th Edition (2025). 2TSF = Thousand Square Feet; VFP = Vehicle Fueling Positions 3Peak hour and daily trip rates for Medical Office use are based on fitted curve equations for total 9,129 sf of medical office proposed for entire project. 4 Internal capture calculations are included in Appendix A 5Pass-by reduction percentage is based on the ITE methodology per 2025 Pass-By Tables for ITE Trip Generation Appendices. Refer to Appendix A 6ADT and Peak Hour rates are based on Costco survey data Included in Attachment A

INTEGRATED ENGINEERING GROUP

TRANSPORTAT PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
6 Table 1-3
Project Trip Generation – Phases I & II
Land Use1 Intensity Units2
AM Peak Hour PM Peak Hour Daily
In Out Total In Out Total
Shopping Center (>150) 89.818 TSF 56 35 91 154 160 314 3,268 Pass-by Reduction (29% - PM Peak Hour & Daily)3 0 0 0 45 46 91 948 Total Phase II 56 35 91 109 114 223 2,320
Total Phases I & II 389 287 676 584 599 1,183 13,185
1Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 12th Edition (2025). 2TSF = Thousand Square Feet
3Pass-by reduction percentage is based on the ITE methodology per 2025 Pass-By Tables for ITE Trip Generation Appendices.

PROJECT TRIP DISTRIBUTION AND ASSIGNMENT
Trip distribution and assignment is the process of identifying the probable destinations, directions, and traffic routes that project related traffic will likely affect. For this project, the trip distribution was developed based on the land use characteristics, surrounding land uses in the vicinity of the project site, anticipated travel patterns to and from the project site and existing travel patterns within the study area. Table 1-4 below shows the project’s trip distribution.

Table 1-4
Project Trip Distribution
Direction Distribution Primary Corridors
North 21% Coffee Road and Callaway Drive
East 22% Rosedale Highway (CA-58), Westside Parkway and Truxton Road South 24% Coffee Road and Callaway Drive
West 33% Rosedale Highway (CA-58), Brimhall Avenue and Westside Parkway Figures 1-1 through 1-4 show project site plan, study area, and trip assignment at study intersections for each project phase. Table 1-5 below shows trip assignment at study roadway segments.

INTEGRATED ENGINEERING GROUP

TRANSPORTAT PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
7 Table 1-5
Project Trip Assignment – Roadway Segments
Roadway Segment Phase I ADT Phase I & II ADT
Total ADT 10,865 13,185
Rosedale Highway (CA-58)
Old Farm Road to Verdugo Lane 869 1,055
Verdugo Lane to Calloway Drive 1,358 1,648
Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 2,553 3,099 El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 3,151 3,824 Northwest Promenade to Coffee Road 1,684 2,044
Coffee Road to Patton Way 598 725
Coffee Road
Olive Drive to Hageman Road 978 1,187
Hageman Road to Meany Avenue/Riverlakes Drive 1,304 1,582 Riverlakes Drive/Meany Avenue to Downing Avenue 1,738 2,110 Downing Avenue to Granite Falls Drive 1,956 2,373
Granite Falls Drive to Rosedale Highway (CA-58) 2,064 2,505 Rosedale Highway (CA-58) to Jet Way 2,173 2,637
Jet Way to Brimhall Road 4,889 5,934
Brimhall Road to Westside Parkway EB Ramps 2,227 2,703
Westside Parkway EB Ramps to Truxtun Road 2,064 2,505
Truxtun Road to Stockdale Highway 1,630 1,978
Calloway Drive
Noriega Road to Hageman Road 435 527
Hageman Road to Meacham Road 543 659
Meacham Road to Rosedale Highway (CA-58) 652 791
Rosedale Highway (CA-58) to Brimhall Road 815 989
Brimhall Road
Allen Road to Old Farm Road 435 527
Old Farm Road to Jewetta Avenue 652 791
Jewetta Avenue to Verdugo Lane 1,087 1,319
Verdugo Lane to Calloway Drive 1,195 1,450
Calloway Drive to Harvest Creek Road 1,630 1,978
Harvest Creek Road to Coffee Road 1,738 2,110
Hageman Road
Calloway Drive to Coffee Road 109 132

INTEGRATED ENGINEERING GROUP

TRANSPORTAT PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Project Introduction
8 PROJECT ACCESS
Access to the project site will be provided via one (1) proposed full access driveway along El Toro Viejo Road, three (3) proposed right in/right out only driveways along Rosedale Highway (CA-58), one (1) proposed right in/right out only driveway along Coffee Frontage Road, and the addition of a fourth approach at existing signalized intersections at Rosedale Highway (CA-58) and Northwest Promenade, and Coffee Road and Jet Way.

PARKING
The proposed development will be required to provide on-site parking spaces consistent with City of Bakersfield parking requirements.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
SWC Rosedale & Coffee, Bakersfield
Project Site Plan
Figure 1-1
FFRC f

TLAN FOOUIT
PAD 5—
_____ DJ/EAST CASUAL___________PAD 6 - = - - PAD _______ PAD 8_____

DT RESTAURANT
4271 SF
NON-SPRINKLEFEO BPRINMGLERED SPRINKLERED £
PG&E SETBACK 2,
-
— PROPERTY LINE L 1
1 5 LANDSCAPE SETBACK §
CHE A 15 L .NOSCAPE SETBACK B
22 at tlre - [I ?
[S 1 2;"
tpp t s -
—
5 “V —3 - £ P
Mg £ 8
, a e oou F. J
£
t
t
u *PP
----------- -—4,979 8F—s—R 4,579 8= # SPRIMLCIED -d— I l : EE W ttte*== MAORB . 1 — ieve S ' r
$ A F 99 12 W fl’ ’ t
/! 8 MAJOR A □ ’ }
HEALTH CLUB .

I w *
.0 0
PG&E SETBACK 8
MARKET 8
245r U =ut ie GREEN SPACE i; 2 I 1 0 0 t
Ce J 441
8 A $ mCASUAL REST 7
(
PLAZA 1
7 •amtr —== ?
1 q mbio s / - -PROPERTY UNE
- Psza 7 r
) 1
7 T 67 3:0 ' CASUAL REST- “• CASUAL REST. -frrns 1m—e / —-=a-l,4—jvoo—
—
d
I ( ee
67 ' zan an an m
■
I Site Summary - Future Expansion I ■4 19 d
8 H1 0 I
7 S' J RA 1 4 fl mass 2, I
35 4
61 et-r
ol
1* 6 fl 6
I
7 &
I
I
25 1‛L 5
1%
9 I
Hn TOTAL SITE AREA &
91 I 8 i %
fh? • T/ 1
I 7
6e_61/1188EFTTpa.
a
I
/0 I
I
#
I
2 6. i %
PARKING REQUIRED “S
I
5 •fl REQ AREA (BE) STALLS
1/300 SF 270,168 SOI 8
1 |
0 1
"*
TOTAL: 405,531 1,760 1 I I 8 •s
&
#
I
PROJECT SITE USES i 5
°, LEGEND -
10- 4,0,
"* 0 4 C
I
2014. - N 1 "2
I
PHASE 1
an U
PHASE 2 I

FUTURE EXPANSION I
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING

24.803 SF

SFHNKLEPED
woo

SETBACK
2 20 DUAL SIDED

DISPENSERS
£
§

MAJOR E
RETAIL
25,047 SF

SFR INKLERED
LU
LU

MAJOR G
RETAIL
15,562 SF

SPHINKLEREO
S
A
MAJOR,
t.0T
43,231
1930
4,100
40,000

MAJOR I
RETAIL
25,013 SF
MAJORD
RETAIL

10.0008F
8PRINKLERED
-WDE

MLTHJSEPATH
10-
STBAC
O
O
MAJOR C s
19/00 SF i
OFFICE
208 SF
T3
I

MAJOR I
RETAIL
25013SF
SPANKLEnED 169
RETAIL
4,694 SF
6 d
6 MAJOR F
RETAIL
I.012SF

SPANKLENED
—
1200 SF
175 SF
1200
• Employee
-PG4E

SETBACK

PRELIMINARY

RETENTION BASIN
SHOPS 2

RETAIL/FAST
Q
<
o
C
MAJORJ
14,176 SF
PAD 9
REST.

SPNKLERED
35,008 SF

EFRINKLEFED

MAJOR H
REJAL.
/STORAGE
120 SF

MAJOR E
BEJAL

MAJOR J

SPRINKLERED

MAJOR H
RETAJL
19,2218F

SPANKLERED
2,010,574 St
405,531 Si
$85,531 Si
395 /1

19.18 %

TOTAL GROSS FLOOR AREA

TOTAL GROSS FLOOR FOOTPRINT AREA

LAND TO BUILDING RATIO

BUILDING COVERAGE
- EXSIa TRAFFIC
SDNA
PAD 12
MED. OFFICE
9,129 SF

SFHINKLEREO
100
644
45 0
0 — PAD 14

REST/RETAIL
7,135 SF

SPANKLEED
(T5 SHOPS?-------------- F
RETAIL/FAST • -
1 CASUAL REST. wmp
10 WIDE

MU THJSE PATH
SQuAnrOOTAGe/Unn
217,203
31,799
154%
4,100
24,993
8,966
ML.CIUsEPAn
PAD 11

DT REST/RETAIL
SFRINKLEFEO APN: $68-010-05
ZONING USE: (M-2) GENERAL MANUFACTURING
LAND USE DESIGNATION: (LI-1) LIGHT INDUSTRIAL
REQUIRED SETBACKS:

Front 10 Ft
Reanrya
Side: 10 Ft
BLDG. HEIGHT: SO FL Max
PARKING DIMENSIONS: 9FL.xIBFL
DRIVE AISLE WIDTH: 25 R
FIRELANE ACCESS WIDTH: 20 FL Min
LANDSCAPE SETBACK: 10FLMn.

TREE PLANTING: ITFEE PER6 PARKING SPACES

MAJOR D
RETAIL
10,000 SF
PAD 13

RESTAURANT
RETAIL
4,684 SF
PARKING PROVIDED__________________

PROPOSED PARKING STALLS

PICK-UP WINDOW CREDIT
OVERALL PROPOSED PARKING STALLS:

PROPOSED PARKING RATIO:

Retsurant (Si Down and Fast Cassal)
Reetsurant (Drie-Thru)
CaWash
Heath Club
Medical Office
Publa Storage
Elec. A Frre Room________________
TOTAL LEASEABLE AREA_________

TOTAL CROSS FLOOR AREA
2,057 Stak
24 SMB

5.13 1.00C8f
B.J

MAJOR F
RETAIL
18,012 SF
1 ---- w3*—
SANKErEO
100
E
l==
8Q
8 >
o
%

RESTAURANT
66BBSF
• 0 ON GRADE LOMDN3-
f • (6

DT RESTAURANT
2578 SF

NON-SPRINKLEFEO

CONTROLLER FUEL CANOPY CONTROLLER
________DT EAST CASUAL_

RESTAURANT
5224 3

SPRINKLEREO
THmmmlHIP
USE
Ratsil Snge Tenant
JBsnkiFitees Cffice
Ratsil Muli Tenant Shops
Reetaurants/ DIT
Medical Cinic
Carman
Publa Storage
Eloo. &FreRoom
PAD 10

DT/FAST
CASUAL REST.

RETAIL
10,110 SF

SANKLERED

ROSEDALE HIGHWAY

MAJOR G
RETAIL
saa
-------ues------
I
= = PAD ______

DT RESTAURANT
700 SP

NONSPANKLEAED
h. UJ
M&XREsasam
PAD 2

CAR WASH
1100 Sf
EXISTING ""TYWPL
PGsE SETBACK
SWC Rosedale and Coffee, Bakersfield
Project Study Area
Figure 1-2

PROJECT SITE
7 6 5 4 3 2 1
20 8
21 22
23 10
26 25
12 11 9
19 16
15 LEGEND # Intersection
17 18
24 14 13
32 31
28 29 30
27 4
tW aner -eomes
mnd
3e . avers stot.
#
whs • L 474
htg D 11 2 5557 J eea" St
3 a
OS -54 7
$ “2 C r 2
TP helmASCR d HSIgSEPHOre
Tmaeii (TU.L UMA17 CITI GW, sere, - • 22’24 %222. Dne 127 V ye J K
Y
HO SV 7,. MMMMNmg "ITTMIITY tormyaoterge aa-dit gi v
wa. eree"of so 0
co
C CMat
V mnnnn. l
If ( Me"
4 h
4 kr i “ ■
5 "I
EC 5
r
da
(‘4 "e 4
dadl e d
f 4 2
l
are. delr.
l o ■ "an "SCCN hr
58 H 3
OPr A N50 u : AP .2 Ths 127 J
saE ts Aatt WW559(/a 4 □11
Pi
WO y W.
; 5at l.1
, its W ■
I
Le. $ * . ad" whahtl • O 2 ya “if a ill22 C TIIT"
$ NC7 1
I L 0-0
Tit. P
smeu .
•' 1 (= al k 0 he," 4 “alybte ' ' 7 Pee -----== 7. us "Uyame at SRer amill
t
$ ' (2217731) 38
M21) •
UDTMU C "1“ A
nd 1274.7
O(- /
E
tor
o
a ««s "91
V he
cag, C2S
D./cu", Li 222141 i memotn
Reeneme . Eontheert PM17 I -: -4 E
1 W) e
is . $0 ) ee FFFib. Htfl 0 3
", H AMAAETR s
I
-e. Vit
OMTet,
“-Teng" Meacham Rd P
* EEAe-2)
As955 AEUSE
n - 35‘s
9wur
PkW)
7C at
s
amnt
ngnnt
\ 1
A

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
S
5$
o"
O
ear —
Pr
—C “PA ‘s
44 517
"ZlA9
1 2)7
mere
wld;
"TAs
2 2
on oo
. V
En "s
meAte
JudETe Wa-l
remme Cenerme mbit
i .

K. ।
•0 . e it itm
tele FnmnanTi
&OUOU/
ymuuoenE 4 prmpemeert)
PPRRFPFr % 25 . mretem) P t 3
Rem 7‘stg
t - "
he
mmebaes
CgL “ae
CM
‘heaiTlt l’et <fn. wdsder" sa
‘Woalo.t
' tU)"" 211213 T0%
-—T
SEsEHd y — yedd1 ■ PrIm mwn" / SNWEumT. wUMe,
S3W
e
“2
fa
-
: whr peouge .4 2 0. E ‘ 1
an - a
. -' ■ "
Finut 4
has
J'/IViHri/Wi TAMA1a-A38/zMf2r.

ACAMap
remrenras
e
A
s5 . ,
FPITs T I" " ,
-at
J >'
“het
Et
- "he
-
alme
A RRNg 783 42
4 MM! -a amt
WEAUee ■■ “7
. PA
==
Th
3 EW 41 1 ; Ag
aomanlry
JSMERMCaTS edt THSOE G.’ Seelg- C tomneeas "is
anseeesemoee
FU
art “6d s '
—mang
BAITsl
o
anet./A EG; Th & tTL $. ■ rn TO • CKost, W - i “ss “amnee aadsersere. watt
(EAMage
lew am u
MEgM tge"
. ■ faes
Iheae
ogi 11
--lsEMS 4-
egee ULASngUs2n"2tt"
at
d tssmEE,
I i JFFEWEa ““*di
Je
“e
avnCif E
Alr
S."reor
tlii_J
IJ3mA1"y euue He " EC. TrT101 SFFEUH mag (hl ding tJ rnmtnn 11 191,52JC0 29 eh. Sel s
,8 R 7 riet wreptyn d nr 1222? ■ TAah M ae
—
Tt
=reesemawds sat.

SWC Rosedale and Coffee, Bakersfield
Project Phase I Peak Hour Volumes
Figure 1-3a
Signalized
0/0 J *1 t P
0/0 -
3/5)
0/0 •
0/0 -
3/5-1
— 0/0
- 34/59
f 5/10
V o/o
• 0/0
C 0/0
Signalized
0/0 J
0/0 at
Signalized
0/0 J
13/20 *
JIL
O
o
C
o
C 3/5
4 9/15
C 8/15
6/10
- 20/35
r 3/s
Signalized
“i t r
9 o o
315J
13/24 -
3/5 n
0 J 4 L
o
o
o
C 0/0
— 0/0
C 80/123
L 0/0
- 46/71
J 4 U C 0/0
o
o
o
— 0/0
— 17/24
C 0/0
0/0 J
132/212 -
78/120 n)
0/0 J
66/110 =
) 64/ 101 "1
17 18 Coffee Rd & Downing Ave Coffee Rd & Granite Falls Dr 19 20 Coffee Rd & Project Dwy GlJet Way Coffee Rd & Riverlakes Dr/Meany
Ave
t R D
D o
0/0 •
0/0 =
) 3/51
C
J 4 L
o
o
o
L 0/0
— 0/0
C 10/14
L 0/0
- 3/5
r 3/5
9 JIL
Harvest Creek
D
o
O
o
o
o
t r 0/0
D
a
22/35 •
) 0/0 1
Rd & Brimhall Rd 10 II Calloway Dr & Brimhall Rd Verdugo Ln & Brimhall Rd Jewetta Ave & Brimhall Rd 12 L 3/5
- 21/35
r io/i9
t r 0/0
D
D o
13/19 m
1 0/0 n)
— 0/0
— 96/159
C 0/0
Signalized
42/69 J
0/0 -
204 / 337 •
0/0 •
0/0 -
7/10 •
0/0
3/5
0/0
Signalized S gnalized
14 15 16
0 0 0
O
JIL
Brimhall Rd Allen Road & Brimhall Rd Coffee Rd & Olive Drive Coffee Rd & Hageman Rd t 0/0
— 0/0
^7/10
t 0/0
— 6/10
r 3/5
12/20
22/35
0/0
Signalized S gnalized
0/0
22/34
0/0
Signalized S gnalized
5 Calloway Dr &
58)
Signalized
n 1 r 66/110
42/69
12/ 17
9 o
3/57
13/24-6
3/5
1 2 3 4 Patton Wy & Rosedale Hwy (CA-58) Coffee Rd & Rosedale Hwy (CA-58) El Toro Viejo Rd/Clay Patrick Farr Wy & Rosedale Hwy (CA-58)
NW Promenade/Project Dwy D &
Rosedale Hwy (CA-58)
Signalized Signalized Signalized
Signalized
0/0 J
6/10 =
0/0 1
h
o
13 J 4 L
Old Farm Rd &
o
O
o
O
o
Signalized
0/0 J
25 / 40 *
0/0 1
h
o
Signalized
0/0 J
42/63 -
0/0 1
h
o
6 7 8
C
JIL J 4 L JIL
Rosedale Hwy (CA-Coffee Rd & Brimhall Rd
O
o
D
o
D
o
C
o
O
o
D
o
t 23/40
— 35/64
C 18/34
Old Farm Rd & Rosedale Hwy (CA-58)
Verdugo Ln & Rosedale Hwy (CA-58)
L 0/0
— 17/24
C 0/0
L 3/5
— BI IS
^6/10
t 10/19
— 17/30
C Bl 15
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized Signalized £0/0 10/0 — 56/83 F0io Lo'o — SO/73 f 0/0 61 /0l • SI /8^ 0/0
• 36/53
F0/o
5/10 )
4 6€ / IZ
10/19 m
3/ 5
6/ 10 )
0/0 m
t 01 /9
0/0
0/0 m
01/9.3
.0/0
40/0
6/10 )
0/ 0
0/0 m
~0/0
• 20/30
0/o
(0/0
84/ 131
1 34/52
— 0/0
18/30
72/119
36/60)
6/10 m)
96/
0/0
159
42/69
0/0 •
~0/0
•26/ 38
0/o
7/10 ")
0/0 m
0/0 m)0/0 ")
253/ 386
4 t 0/0
5/10 )
29/54 =>
5 / 10
o/o J
46/70
30/42
7/10 )
0/0 =
38/59 )
0/0 =
66 ISlJ
10/0
4= 0/0
SWC Rosedale and Coffee, Bakersfield
Project Phase I Peak Hour Volumes
Figure 1-3b
Signalized
e-Way Stof
0/0
0/0 *
18/25
— 0/0
- 80 : 123
C 0/0
Signalized
J h t r 0/0
u
0/0
00 C
o
3/5 "I
— 17/24
- 0/0
C 0/0
r
o
—
One-Way Stop
— 13/19
- 0/0
C 0/0
— 0/0
- 0/0
C 0/0
L 0/0
- 0/0
C 0/0
27 t 90/149
— 0/0
C 6/10
El Toro Viejo Rd & Project
Driveway A
31 32 Coffee Rd & Project Dwy H
Rosedale Hwy (CA-Coffee Rd & Project Dwy F
28 Project Dwy B
58)
One-Way Stop
0/0 J h i r
50 0/0 *
0/0 “I o o
Signalized
J htr 0/0
0/0 -
0/0 1
C
o
o
o
0/0 -
0/0 •
18/25 1
One-Way Stop-0/0 -
106/171 •
26/41
Meacham Nd
t 0/0
— 0/0
C 3/5
26 Calloway Dr &
i t r
2 s
D
o
D
o
& Rosedale Hwy (CA-t 0/0
— 96/ 159
C 0/0
0/0 J
0/0 •
30 JIL
0/0 -
84/ 140 •
18/30 )
O
o
O
o
Project Dwy E
58)
a
0/0 J
106/171 •
24/40 ")
21 22 23 24 Coffee Rd&Ti ruxtun Ave Calloway Dr &
Coffee Rd/Gosford Rd & Stockdale
Hwy
Coffee Rd & Westside Pkwy EB
Ramps
Signalized
17/24 J h 1 r
One-Way Stop-29
JIL
O
o
Project Dwy C & Rosedale Hwy (CA-58)
o o
L 0/0
— 96/159
C 0/0
[
Signalized
Hageman Rd
t 0/0
— 0/0
r 3/5
Noriega Road
L 0/0
— 0/0
C 0/0
XX/XX AM / PM Peak Hour Volumes
25 G
J I L
Calloway Dr &
O
o
0/0 J
0/0 -
3/55)
o
One-Way Stop
Signalized
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
HI ci J
+= 13/24
56/ tl •)
253/386
0/0
F 0/0
- 69/z— 0/0
— 32/51
• 64 197
(0/0
0/0
Lo/o^10/14
—
— 0/0
ttui
P 0/0
0/0 J
Lo/o
4 234/379
OS I / 86 •
~0/0
4=0/0Lo/o
4 0/0
(0/0
o/o J
Lo/o
• 19/29
Lo/o^39/73^10/19
0/0 J
49/92
Hl CI ”1
24 / 40 •
3/5
0/00/0 m)
T
17/30 =>
3/5
0/0 —
0/0
24/40 n 0/0
60/86
0/0 r
«- OC/ II
- S/E
s/t
SWC Rosedale and Coffee, Bakersfield
Project Phases I-II Peak Hour Volumes
Figure 1-4a
)
0/0
0/0 •)
4/6 n)
2 Coffee Rd & Rosedale
S gna ized
JIL
-
Signalized
o
9 o
316 J
14/30 -
3/6 1
0/0 •
70/131 -
72/118 ")
1 J I U
Patton Wy & Rosedale Hwy (CA-58)
o
D
o
L 0/0
— 19/29
C 0/0
V o/o
— 0/0
C 0/0
0/0
0/0
4/6
O
o
L
t r
o o
c --
— 0/0
- 0/0
C 12/18
L 0/0 Pi
— 3/6
C 3/6
D -
o —
J 4
0/0 J
16/24 -
0/0
t r
O
o
00 t
Signa izec
17 18 Coffee Rd & Downing Ave 19 Coffee Rd & Granite Falls Dr 20 Coffee Rd & Project Dwy G/Jet Way Coffee Rd & Riverlakes Dr/Meany
Ave
J i L
O
o
D
o
o
o
L 0/0
- 6/ 12
C 3/6
U 4/6
- 21/42
( 11/24
5 6 7 8 Coffee Rd & Brimhall
Old Farm Rd & Rosedale Hwy (CA-58)Calloway Dr & Rosedale Hwy (CA-58)Verdugo Ln & Rosedale Hwy (CA-58) Pl
JIL
9 o
9 o
L 24/48
— 38/78
C 20/42
L 11/24
— 18/36
C 9/ 18
Hwy (CA-58)
0/0
50/82
0/0
69 1 129 J
43/82 -
13/23 1
n
o
6 3
9 OIO
JIL
L o/o
— o/o
C 07/142
NW Promenade/Project Dwy D &
Rosedale Hwy (CA-58)
44/81 J
0/0 -
212/397
0/0
0/0 •
4/6
Brimhall Rd 14 Allen Road & Brimhall Rd 15 Coffee Rd & Olive Drive Coffee Rd & Hageman Rd 16 0/0 •
16/24 -
0/0 n)
0/0 •
28 / 42 -
0/0 n) )
— 3/6
- 9/ 18
C 9/ 18
Signalized
h t r
I
0 D
6 O
o
0/0 J
28/42 -
0/0 )
U 0/0
— 99/188
C 0/0
Signalized
J htr
1 8
5 Signalized
0/0 J
4/6 -
0/0 1
h
o
Brimhall Rd II Verdugo Ln & Brimhall Rd 12 Jewetta Ave & Brimhall Rd — 6/12
- 21/42
c 3/6
Signalized
0/0 J
150 / 250 -
87/ 140 n)
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
0/0
0/0
4/6
S gna ized Signalized
0/0
0/0 =
8/ 12
13 J I L
Old Farm Rd &
O
o o
o
o
0/0
8/ 12 •
0/0 n)
Signalized S gna ized
0/0 •
32 / 48 -
0/0 n)
Signalized
t r
9 o
o
o
3/6 J
14/30 —
3/6 “J
9 10
00 3
J 1 L JIL
Harvest Creek Rd & Brimhall Rd Calloway Dr &
16/24
28/42
0/0
9 o
9 o
9 o
9 o
L o/o
— 36/72
r 6/12
n t r
9 — —
Signalized
0/03
52/77 -
0/0 1
h
o
Rd
0/0
19/29
0/0
Signalized Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized
■
Signalized
Signalized
Signalized
Signalized
9 / 18
11 /24
3/6
0/0 J
94/ 153
1 37/60
UZ1/8
0/0
0/0 m
99/188
0/0 J 1
- 18/15 n 89/86 =
L0/0
• 60/89
P0/0
0/0 J
101 /89 -
0/01
4 0/0
0/0
911
•0/0
0/0
c
0/0
+ 44/65
F0ro
— 0/0
0/0 m)
275/446
U 0/0
50/ 102
3/6
8/12 )
0/0
0/0 m
U ZI /8
0/0
0/0 =
0/0 •
28/41 -
4/6 -
48/71 "J
0/0 m
8v /It J
10/0
4=0/0
0/0
• 22/35
F0ro
Lo/o
40/0
— 0/0
19/35
01/52
38 / 70 )
6/12 •
6/12 )
32/66 =
6/12
Z1/9
23 /48
3/ 6
Z1/8
0/00/0 =
0/0
•32/ 47
^0/0
8/12 ")
0/00/0 m
SWC Rosedale and Coffee, Bakersfield
Project Phases I-II Peak Hour Volumes
Figure 1-4b
t r
00 o
1 0/0 •
0/0 •
19/35 )
— 0/0
- 87/142
C 0/0
— 94/175
- 0/0
C 6112
One-Way Stop
27 28
El Toro Viejo Rd & Project
Driveway A
Project Dwy B
58)
C 0/0
- 0/0
C 0/0
Signalized One-Way Stop
0/0 J h t P 0/0 J hh 1 r
-0 0/0 * e
0/0 )
O
o
O
o
0/0 •
4/6
#
— 19/29
- 0/0
C 0/0
31 32
Rosedale Hwy (CA-Coffee Rd & Project Dwy F Coffee Rd & Project Dwy H One-Way Stop
0/0 -
121/202 •
29 / 48
23 24 Calloway Dr &
Coffee Rd/Gosford Rd & Stockdale
Hwy
22 r
L.

Coffee Rd & Truxtun Ave
L 16/23
*0/0
C 0/0
Meacham Nd
L 0/0
4 0/0
C Mt
1 Signalized
8/12 J ht r
)
N
0/0
0/0
9 o o
30 0
JIL
9 o
9 o
0/0 •
87/ 165 •
21/36")
Project Dwy E
SS)
Signalized
0/0 •
0/0 •
19/35 1
One-Way Stop
0/0
)
0/0
4/6
21 7
JIL
I }
Signalized
J -1 1 r 19/29
o
o
L 0/0
— 0/0
C 0/0
Coffee Rd & Westside Pkwy EB
Ramps
& Rosedale Hwy (CA
L 0/0
- 99/188
1 0/0
Hageman Rd Calloway Dr & 26
a
D
t C
o s
D "
& Rosedale wy (CA-L 0/0
— 99/ 188
C 0/0
t r
D 09
Noriega Road
o
L 0/0
— 0/0
C 0/0
29 JIL
9 o
9 o o
0/0 J
118/201 •
28/48 n
Project DwyC
58)
25 JIL
Calloway Dr &
O
o
0/0 J
0/0 •
416")
o
Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized
One-Way Stop
(0/0
Oil / IZ
— 36/60
( 109/ 175
0/0
L 0/0
0/0 J
Lo/o
#0/0
06/£► •0£/ SI “Ot/H - Ot/H J
L 0/0
38 / 58 “)
0/00/0 =)
0/0
54/82
0/0
t 0/0
275 / 446 m)
0/0 •
0/0 J
Lo/o
+ 250/455
s
r
0/0
70/ 105
0/0
Lo/o^12/18
ro/o
0/0 J
Lo/o4- 24/36
L 8k m
- 0/0
r o/o
• w/ci
L 9/8
r 9/6
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Methodologies
15 2.0 METHODOLOGIES
This section documents the methodologies and assumptions used to conduct the circulation impact analysis for the proposed project. This section contains the following background information:
• Study scenarios
• Study time periods
• Analysis methodologies

STUDY SCENARIOS
This report presents an analysis of the intersections and roadway segments operating conditions which were selected for the following anticipated timeframe scenarios:
• Existing Conditions (Year 2025)
• Year 2027 Cumulative Conditions
• Year 2027 Cumulative + Project Phase I Conditions
• Year 2028 Cumulative Conditions
• Year 2028 Cumulative + Project Phases I & II Conditions • Buildout Year (based on current KCOG model) Conditions (Year 2046) • Buildout Year (based on currently KCOG model) + Project Phases I & II Conditions

TRAFFIC VOLUME DEVELOPMENT
Daily segment and intersection peak hour volumes were conducted on Thursday, February 20, 2025.

Daily segment volumes for all future study scenarios in this report were developed by applying a compounded annual growth rate calculated from a comparison of the Kern Council of Governments (COG) Model Improvement Program (MIP) travel demand model Base Year 2020 and Future Year 2046 plots. Intersection peak hour volumes for all study scenarios were developed based on the Directional Volume Method described in NCHRP Report 2551 Chapter 8. This method is an iterative process that balances inflows and outflows for each intersection approach based on fixed baseline and future segment volumes (all study scenarios). The calculated annual growth rates for roadway segments included in the MIP model network and study intersection volume forecast worksheets are included in Appendix A.

In consultation with the City of Bakersfield Department of Transportation, the future project traffic volumes forecasted by the model account for projected growth over existing conditions from three primary sources: (1) ambient growth resulting from overall regional development occurring outside the study area; (2) traffic generated by planned and approved development projects within or near the study area that are incorporated into the model; and (3) roadway capacity enhancements and, in some cases, traffic redistribution associated with planned regional transportation improvements.

ANALYSIS METHODOLOGIES
Street system operating conditions are typically described in terms of “level of service.” Level of service is a report-card scale used to indicate the quality of traffic flow on roadway segments and at 1 http://ajhassoc.com/wp-content/uploads/2017/01/Report255.pdf

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Methodologies
16 intersections. Level of service (LOS) ranges from LOS A (free flow, little congestion) to LOS F (forced flow, extreme congestion). Table 2-1 describes generalized definitions of auto LOS A through F.

Table 2-1
Vehicular Level of Service Definitions
LOS Characteristics
A
Primarily free-flow operation. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Controlled delay at the boundary intersections is minimal. The travel speed exceeds 80% of the base free-flow speed, and the volume-to-capacity ratio is no greater than 1.0.

B
Reasonably unimpeded operation. The ability to maneuver within the traffic stream is only slightly restricted and control delay at the boundary intersections is not significant. The travel speed is between 67% and 80% of the base free-flow speed, and the volume-to-capacity ratio is no greater than 1.0.

C
Stable operation. The ability to maneuver and change lanes at mid-segment locations may be more restricted than at LOS B. Longer queues at the boundary intersections may contribute to lower travel speeds. The travel speed is between 50% and 67% of the base free-flow speed, and the volume-to-capacity ratio is no greater than

1.0. D
Less stable condition in which small increases in flow may cause substantial increases in delay and decreases in travel speed. This operation may be due to adverse signal progression, high volume, or inappropriate signal timing at the boundary intersections. The travel speed is between 40% and 50% of the base free-flow speed, and the volume-to-capacity ratio is no greater than 1.0.

E
Unstable operation and significant delay. Such operations may be due to some combination of adverse signal progression, high volume, and inappropriate signal timing at the boundary intersections. The travel speed is between 30% and 40% of the base free-flow speed, and the volume-to-capacity ratio is no greater than 1.0.

F
Flow at extremely low speed. Congestion is likely occurring at the boundary intersections, as indicated by high delay and extensive queuing. The travel speed is 30% or less of the base free-flow speed, or the volume-to-capacity ratio is greater than 1.0.

Source: Highway Capacity Manual 7th Edition
Intersection Capacity Analysis
The analysis of peak hour intersection performance was conducted using the Synchro 12 software program, which uses methodologies defined in the Highway Capacity Manual 7th Edition (HCM) to calculate LOS. Level of service (LOS) for intersections is determined by control delay. Control delay is defined as the total elapsed time from when a vehicle stops at the end of a queue to the time the vehicle departs from the stop line. The total elapsed time includes the time required for the vehicle to travel from the last-in-queue position to the first-in-queue position, including deceleration of vehicles from free-flow speed to the speed of vehicles in the queue.

Signalized Intersections
The HCM analysis methodology for evaluating signalized intersections is based on the “operational analysis” procedure. This technique uses 1,900 passenger cars per hour of green per lane (pcphpl) as the maximum saturation flow of a single lane at an intersection. Average control delay is calculated by taking a volume-weighted average of all the delays for all vehicles entering the intersection. Table 2-2 summarizes the level of service criteria for signalized intersections.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Methodologies
Table 2-2
Signalized Intersection Level of Service HCM Operational Analysis Method Source: Highway Capacity Manual 7th Edition
Roadway Segments
Roadway segment operations were evaluated by comparing the existing and forecasted traffic volumes to the two-way daily traffic volume capacities from the Circulation Element of the Metropolitan Bakersfield General Plan. Table 2-3 shows roadway classifications with volume capacities used for this study area.

Table 2-3
Roadway Segment Capacity Thresholds
Roadway Classification Maximum Two-Way Volume Capacity
6-lane arterial 60,000
4-lane arterial 40,000
4-lane collector 30,000
2-lane collector 15,000
Source: Metropolitan Bakersfield General Plan Circulation Element Page III-4 (2002) A volume-to-capacity ratio (v/c) of greater than 0.80 corresponds to a LOS of less than C, as defined in the HCM.

City of Bakersfield General Plan Compliance
In coordination with City staff, the Transportation Analysis will identify LOS deficiencies for compliance with the Metropolitan Bakersfield General Plan goals. The BDM has established LOS “C” as the minimum allowable level of service at intersections and roadway segments. Therefore, if the addition of project traffic causes the following at any intersection or roadway segment, it will be considered deficient for the purposes of this analysis:
 Drops to LOS D or worse
Average Control Delay
Per Vehicle (seconds) Level of Service (LOS) Characteristics <10.0
LOS A occurs when the volume-to-capacity ratio is low and either progression is exceptionally favorable or the cycle length is very short. If it is due to favorable progression, most vehicles arrive during the green indication and travel through the intersection without stopping.

10.1 – 20.0 LOS B occurs when the volume-to-capacity ratio is low and either progression is highly favorable or the cycle length is short. More vehicles stop than with LOS A. >20.0 – 35.0
LOS C occurs when progression is favorable or the cycle length is moderate. Individual cycle failures (i.e., one or more queued vehicles are not able to depart as a result of insufficient capacity during the cycle) may begin to appear at this level. The number of vehicles stopping is significant, although many vehicles still pass through the intersection without stopping. >35.0 – 55.0 LOS D occurs when the volume-to-capacity ratio is high and either progression is ineffective or the cycle length is long. Many vehicles stop and individual cycle failures are noticeable. >55.0 – 80.0 LOS E occurs when the volume-to-capacity ratio is high, progression is unfavorable, and the cycle length is long. Individual cycle failures are frequent. >80.0 LOS F occurs when the volume-to-capacity ratio is very high, progression is very poor, and the cycle length is long. Most cycles fail to clear the queue. 17 I
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Methodologies
 Operates at LOS D or worse under pre-project conditions and project traffic lowers the LOS below pre-project conditions
 For intersections only, an increase in delay per vehicle greater than 5 seconds when operating at LOS D or worse in pre-project conditions
Improvements
New development projects within the City of Bakersfield are required to provide needed infrastructure improvements to meet the demand created by the development and provide off-site improvements designed to ensure construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements and the project will pay its fair share contribution towards the coast of these improvements.
18 Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Existing Conditions (2025)
19 3.0 EXISTING CONDITION (YEAR 2025) SCENARIO
This section documents the circulation system conditions within the study area of the project and operational deficiencies on the existing local and regional circulation networks under Existing Conditions scenario. No network improvements are assumed under Existing Conditions.

ROADWAY NETWORK
Locally significant roadways located within the study area of the proposed project are discussed below.

Brimhall Road functions as a 4-lane collector from Jewetta Avenue to Coffee Road. The posted speed limit on Brimhall Road is 50 miles per hour (mph). Per the Metropolitan Bakersfield General Plan, the buildout classification for Brimhall Road is an arterial from Jewetta Avenue to Calloway Drive and a collector between Calloway Drive and Coffee Road.

Calloway Drive functions as a 6-lane arterial from Meacham Road to Rosedale Highway (CA-58) and Brimhall Road to Westside Parkway EB Ramps, and a 4-lane arterial from Rosedale Highway (CA-58) to Brimhall Road. The posted speed limit on Calloway Drive is 55 mph. Per the Metropolitan Bakersfield General Plan, the buildout classification for these segments of Calloway Drive is an arterial.

Coffee Road functions as a six-lane arterial from Olive Drive to Stockdale Highway. The posted speed limit on Coffee Road is 55 mph. Per the Metropolitan Bakersfield General Plan, the buildout classification for this segment of Coffee Road is an arterial.

Rosedale Highway (CA-58) functions as a 4-lane arterial from Old Farm Road to Verdugo Lane and a 6-lane arterial from Verdugo Lane to Fruitvale Road. The posted speed limit on Rosedale Highway (CA-58) is 50 mph. Per the Metropolitan Bakersfield General Plan, the buildout classification for these segments of Rosedale Highway is an arterial.

Figure 3-1 shows the Metropolitan Bakersfield General Plan Circulation Network.

TRANSIT SYSTEM
The Golden Empire Transit (GET) District is the main transit agency servicing the City of Bakersfield.

Currently, GET operates buses on the following three (3) routes within the vicinity of the project:
• Route 61 operates seven days a week and connects the project site to Bakersfield College to the east and California State University at Bakersfield to the south. Daily service frequency is 60 minutes. Bus stops for Route 61 are currently located across the project site, east of the intersection of Northwest Promenade and Rosedale Highway (CA-58) for eastbound travel and along the west side of Coffee Road, south of Granite Falls Drive for southbound travel.

Pedestrian accessibility and connectivity from the project site to these bus stops within a half-mile walking distance is provided along both sides of Rosedale Highway and the west side of Coffee Road.
• Route 82 operates seven days a week and connects the project site to Liberty High School, Bakersfield Christian High School and California State University at Bakersfield to the west and south, and to the Downtown Transit Center to the east. Daily service frequency is 60 minutes.

Bus stops for Route 82 are currently located along Rosedale Highway (CA-58) at Northwest

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Existing Conditions (2025)
20 Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the project site to these bus stops within a half-mile walking distance is provided along both sides of Rosedale Highway.
• Route 84 operates seven days a week and connects the project site to Frontier High School to the west and the Downtown Transit Center to the east. Daily service frequency is 90 minutes.

Bus stops for Route 84 are currently located along Rosedale Highway (CA-58) at Northwest Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the project site to these bus stops within a half-mile walking distance is provided along both sides of Rosedale Highway.

Bus route information is included in Appendix K.

ACTIVE TRANSPORTATION SYSTEM
Pedestrian facilities within the study area of the project include sidewalk along both sides of Rosedale Highway (CA-58), both sides of Coffee Road north of Jet Way and the westside of Coffee Road south of Jet Way. Pedestrian crosswalks are provided at signalized intersections along Rosedale Highway (CA-58) and Coffee Road. Existing Class II Bike Lanes are provided in both directions along Rosedale Highway (CA-58) and Coffee Road.

TRAFFIC VOLUMES
Daily segment and intersection peak hour volumes were conducted on Thursday, February 20, 2025.

ANALYSIS RESULTS
Tables 3-1 and 3-2 show Existing Conditions intersection operation and roadway segment capacity analysis results, respectively.

Figure 3-2 shows intersection turning movement volumes under Existing Conditions.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Existing Conditions (2025)
21 Table 3-1
Existing Year 2025 Intersection Operation Analysis
Intersection
Existing Year 2025
Delay (a) LOS (b)
AM Peak/PM Peak

1. Patton Way and Rosedale Highway (CA-58) 8.3/ 8.7 A / A

2. Coffee Road and Rosedale Highway (CA-58) 34.1 / 36.2 C / D

3. Northwest Promenade/Project Driveway and Rosedale Highway (CA-58) 6.0 / 8.0 A / A

4. El Toro Viejo Road/Clay Patrick Farr Way and Rosedale Highway (CA-58) 14.3 / 15.1 B / B

5. Calloway Drive and Rosedale Highway (CA-58) 27.2 / 35.5 C / D

6. Verdugo Lane and Rosedale Highway (CA-58) 19.3 / 18.7 B / B

7. Old Farm Road and Rosedale Highway (CA-58) 17.0 / 16.5 B / B

8. Coffee Road and Brimhall Road 69.4 / 63.0 E / E

9. Harvest Creek Road and Brimhall Road – not collector 7.3 / 5.9 A / A

10. Calloway Drive and Brimhall Road 23.7 / 23.9 C / C

11. Verdugo Lane and Brimhall Road 18.3 / 15.2 B / B

12. Jewetta Avenue and Brimhall Road 29.0 / 24.0 C / C

13. Old Farm Road and Brimhall Road 16.5 / 13.8 B / B

14. Allen Road and Brimhall Road 23.8 / 19.2 C / B

15. Coffee Road and Olive Drive 21.5 / 20.4 C / C

16. Coffee Road and Hageman Road 19.7 / 21.0 B / C

17. Coffee Road and Riverlakes Drive/Meany Avenue 22.2 / 24.4 C / C

18. Coffee Road and Downing Avenue 13.0 / 16.0 B / B

19. Coffee Road and Granite Falls Drive 9.9 / 11.0 A / B

20. Coffee Road and Jet Way/Project Driveway 4.8 / 5.8 A / A

21. Coffee Road and Westside Parkway EB Ramps 6.2 / 5.6 A / A

22. Coffee Road and Truxtun Avenue 12.0 / 15.3 B / B

23. Coffee Road/Gosford Road and Stockdale Highway 37.7 / 40.0 D / D

24. Calloway Drive and Noriega Road 7.7 / 7.1 A / A

25. Calloway Drive and Hageman Road 21.9 / 24.5 C / C

26. Callaway Drive and Meacham Road 17.8 / 18.7 B / B
Notes:

Bold values indicate intersections operating at LOS D, E or F. (a) Delay refers to the average control delay for the entire intersection, measured in seconds per vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 7th Edition and performed using Synchro 12.

INTEGRATED ENGINEERING GROUP

TRANSPORTATICPLANNING AND ENGINEERIN
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Existing Conditions (2025)
22 Per the analysis results shown in Table 3-1, all analyzed intersections are operating at an acceptable LOS under Existing Conditions scenario except for the following intersections:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway
Existing Conditions peak hour analysis worksheets are provided in Appendix B.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Existing Conditions (2025) 23 Table 3-2
Existing Year 2025 Scenario Roadway Segment Capacity Analysis Roadway Segment Description (a) Classification LOS E
Capacity
Existing Year 2025

ADT V/C LOS
Rosedale Highway (CA-58)
Old Farm Road to Verdugo Lane 4A 4-lane Arterial 40,000 22,291 0.557 C or Better
Verdugo Lane to Calloway Drive 6A 6-lane Arterial 60,000 25,807 0.430 C or Better
Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 6A 6-lane Arterial 60,000 31,761 0.529 C or Better
El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 6A 6-lane Arterial 60,000 33,172 0.553 C or Better
Northwest Promenade to Coffee Road 6A 6-lane Arterial 60,000 34,182 0.570 C or Better
Coffee Road to Patton Way 6A 6-lane Arterial 60,000 30,790 0.513 C or Better
Coffee Road
Olive Drive to Hageman Road 6A 6-lane Arterial 60,000 24,459 0.408 C or Better
Hageman Road to Meany Avenue/Riverlakes Drive 6A 6-lane Arterial 60,000 29,066 0.484 C or Better
Riverlakes Drive/Meany Avenue to Downing Avenue 6A 6-lane Arterial 60,000 35,841 0.597 C or Better
Downing Avenue to Granite Falls Drive 6A 6-lane Arterial 60,000 37,867 0.631 C or Better
Granite Falls Drive to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 35,814 0.597 C or Better
Rosedale Highway (CA-58) to Jet Way 6A 6-lane Arterial 60,000 42,426 0.707 C or Better
Jet Way to Brimhall Road 6A 6-lane Arterial 60,000 42,941 0.716 C or Better
Brimhall Road to Westside Parkway EB Ramps 6A 6-lane Arterial 68,500 b 51,734 0.755 C or Better

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Existing Conditions (2025) 24 Roadway Segment Description (a) Classification LOS E Capacity
Existing Year 2025

ADT V/C LOS
Westside Parkway EB Ramps to Truxtun Road 6A 6-lane Arterial 60,000 43,166 0.719 C or Better
Truxtun Road and Stockdale Highway 6A 6-lane Arterial 60,000 52,165 0.869 D Calloway Drive
Noriega Road to Hageman Road 6A 6-lane Arterial 60,000 26,639 0.444 C or Better
Hageman Road to Meacham Road 6A 6-lane Arterial 60,000 28,037 0.467 C or Better
Meacham Road to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 31,286 0.521 C or Better
Rosedale Highway (CA-58) to Brimhall Road 4A 4-lane Arterial 40,000 38,237 0.956 E Brimhall Road
Allen Road to Old Farm Road 4A 4-lane Arterial 40,000 8,709 0.218 C or Better
Old Farm Road to Jewetta Avenue 4A 4-lane Arterial 40,000 10,604 0.265 C or Better
Jewetta Avenue to Verdugo Lane 4A 4-lane Arterial 40,000 12,485 0.312 C or Better
Verdugo Lane to Calloway Drive 4A 4-lane Arterial 40,000 14,892 0.372 C or Better
Calloway Drive to Harvest Creek Road 4A 4-lane Arterial 40,000 16,029 0.401 C or Better
Harvest Creek Road to Coffee Road 4A 4-lane Arterial 40,000 16,644 0.416 C or Better
Hageman Road
Calloway Drive to Coffee Road 6A 6-lane Arterial 60,000 24,360 0.406 C or Better
Notes:

Bold values indicate roadway segment capacity resulting in LOS D, E or F (a) Thresholds based on Metropolitan Bakersfield General Plan Circulation Element Page III-4 (2002) (b) Accounts for auxiliary lane (4th southbound lane) capacity, calculated based on HCM6 Equation 19-13 Adjustment for Right Turns at a rate of 1/1.18 = 0.85 applied to the capacity for one lane (60,000 ADT/6 lanes = 10,000 ADT/Lane*.85 = 8500 ADT

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Existing Conditions (2025) 25 Per the analysis results shown in Table 3-2, all analyzed roadway segments are operating at an acceptable LOS under Existing Conditions except for the following roadway segments:
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
SWC Rosedale & Coffee, Bakersfield
City of Bakersfield General Plan Circulation Network
Figure 3-1
t
—
E
lesedal efioe
._A
J
T 43
I
A
-
• :
10 ith □
-4-J 9!
—
Z.‘HarrisHd
F
eaar amh
I LP
<99;
I -
■I (119- J
ill H
223-
0 2
N
EEMlase: fr‘=nm
VAfi
t
—
1 J
I
1 I
I
I
4 ■ Miles
fr
111 ‘Ftal ilo wria I
-++
J
4 Pi
janl
1 t
H
1 Lamont
— F
PA Sphere of Influence
•i Planning Boundary
= Freeway
Expressway
------- Highway
-- Arterial
-- Collector
Local
T
I
Oildale
adm Ta.-Sm. S-plmnduld, Ze
(65) BAKERSFIELD 204S
RISE
' l_.

U
5 8
City of Bakersfield
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
+T
L
r
fainfa-LRoln
sdellmt
SWC Rosedale and Coffee, Bakersfield
Existing Year 2025 Peak Hour Volumes
Figure 3-2a
— 19/13
- 443 / 736
C III/142
L 48/100
— 10/34
( 84/125
L 59/78
- 107/125
C 151/239
Signalized
I t r
G
33 124 J
1142/993 -
28/6 1
19 Coffee Rd & Granite Falls Dr
L 0/0
— 0/0
L C 0/0
Nd & Downing Ave
Coffee Rd & Riverlakes DrMeany
Ave
— Ln
4 1
)
— 38/24
- 811/1494
C 2/3
L 72/92
- 254/321
c 40 J 48
L 91 /278
- 519/1007
C 20/21
6 7 8 Coffee Rd & Brimhall Old Farm Road & Rosedale Hwy (CA-58)
Verdugo Ln & Rosedale Hwy (CA-SB)
S gnalized
Patton Vy & Rosedale Hwy (CA-56) 2 Coffee Rd & Rosedale Hwy (CA-58) L 151/242
— 614/949
C 137 / 241
L 12/75
— 0/0
C 60/88
0/0
0/0 -
0/0)
134 / 253
0/0
189/155 n)
Od -arm ox0 A Brmha Kg 14 Allen Rond 2 Brimba|| Rd
L 44/44
- 550 / 825
C 214/174
L 99/142
- 158 / 223
C 147/95
Signalized
141 / 120 J
793 1483 -
117/ 127 1
Signalised
64124 J
416/248 -
193/159 1
22/ 18
629 / 778
1 231/76
L 90/145
- 711/1256
C 13/56
3 t 61 1 134
— 808/1358
C 0/0
NW Promenade & Rosedale Hwy
(CA-58)
Coffee Nd & Jet YYay
"I
15 Coffee Rd & Olive Drive 16 Coffee Rd & Hageman Rd
t 41/85
— 503 / 678
( 139/171
50/43 •
998 / 463 -
204/136
10 Calloway Dr &
6/10
686 / 476 •
156/27 1
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
120/146
1069/ 1017 •
11 /19 n
67/149
1265/ 1127 •
0/0 n)
17/47
4/20
32/81
Signalized S gnalized Signalized
43 / 67 •
921 67 -
267/188 "I
"I
9 O G
O G
JIL
Harvest Creek Rd & Brimhall Rd
t 0/0
— 519/860
C 30/58
1 C 6/20
— 166 / 656
r 92/54
Signalized
127 / 243
485 / 9I0 •
I59/36I )
5 L 110/115
— 717/603
f 306 / 235
Calloway Dr & Rosedale Hwy (CA-58)
)
22/39
322 /134
374 / 203
Signa ized S gna ized
55/41
586/330 •
25/44)
172 /173
336 / 227
292/ 165
Signalized Signalized
0/0
755/552 •
31 / 57 t
II 12
G I
JIL
Brimhall Rd Verdugo Ln & Brimhall Rd Jewetta Avenue & Brimhall Rd t 231 / 282
— 305/ 344
C I3I/I56
t 52/79
- 242 / 291
C 279 / 225
80 /111
689 / 745
20/20
38/24
8II / 1494
2/3
Rd
Signalized
n 1 r 176 / 188
n 700 / 68l
o
384 / 363
33 / 21J
1112 / 993 -6
28/6 3
SignalizedSignalizedSignalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized
Signalized
Signalized
Signalized
C 38/ 39
r 60 / 79
II9I /1333
L 27/41
w
(44/24
867 / 993
t 18/29
T
(33/50
12/0
v/OE
L 8£l /8L1
25/31 —
117/ I0I
I 137/1309
— 168 / 249

OS/EE -J
0III -
l^lOt n
►I/0l •
1555/ 1753
10/0
1 T
C 228/ III
37/ 31
ZS/18)
(338/179
77/46
► II / 66 “I
8H / IS I •
1062/ 1102
U 128/ 174
Z9I 1983
0/0
901 /OS "I
4 61*1 /tOH
U 0/0
177/296
— 06/911
1166/1418
49/81
6vl /8SI •
SZ0I /fZII
t26/63
1111 lU/iS9
IZI
^44/ 69
49/85576 / 616
468 / 648 m)
157/ 165 1

ISZ /SEI
U 0Z/6SI
6/3 =)
153/35
34 / 28 "I
88 / 8
52/47
P 224 / 222
24/34
9SI /II I "I
— Z0I III
4= SI8I /9Z9I
0/0
196/ 150 “)187/ 329
576/ 887
124/ 192
883 / 1284
197/ 439
C 245 / 205
ZHI / 651 1
El/Zi "I
240/ 180 “I
• ELI IU
128/ 109 “I128/ 157
6EE 1 / 068
222 / 219
U 0/0
0/00/0 -4
— S6I IS71
1223/ 1384
286 / 400
201/179 “)
4 IZH/ 818
170/218
9 I3L •
86 / SZI •
£1 /SI
— OSE I OK
664/ 1089 —4
239/ 320
4 940 / 911
(92/ 141
22/19=46 / 30 ")
9/19
129 / 44 ")
41 / 3749 / 33 -4
—88/88
0/0 =
71 / 50
SWC Rosedale and Coffee, Bakersfield
Existing Year 2025 Peak Hour Volumes
Figure 3-2b
21 22 23
1 L
Signalized
J 0/0 157/308 -1 t r J
0/0 324 / 530
0/0 63/ 155 1 1
Coffee Rd & Westside Pkwy EB Ramps Coffee Rd & Truxtun Ave Coffee Rd/Gosford Rd & Stockdale Hwy t 324/ 369
— 521/671
C 199 / 306
o
o
8 25 Calloway Dr & Hageman Rd Calloway Dr & Meacham Rd 26 Signalized
24 Calloway Dr & Noriega Road
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
1 t r j 199/ 143 ‘1 i r
0/0 O
240/ 151 1
J t r 292/254
0/0
196/ 162 3
Signalized
1 Signalized Signalized
[
Signalized
C 330/ 188
3 t 439 / 300
0/0 •0/0 1
v 592 / 642
60/84
co
675/ 1273 $
96/ 173
C 52/30
8 51 1074/1115
8 V 55 / 62
188/211 8
479/907
87/200 J
C 366 / 208
771/802
C 91/ 107
1 CC
P
0/0
996/ 1003
SU /ZI l ")
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 29 4.0 YEAR 2027 CUMULATIVE CONDITIONS
This section documents the circulation system conditions within the study area of the project under Year 2027 scenarios. As stated in Chapter 2, compounded annual growth rates were applied to 2025 daily roadway segment counts for 2 years to develop Year 2027 Cumulative segment volumes. These developed volumes and NCHRP Report 255 Directional Volume Method were then applied to 2025 peak hour intersection turning counts to develop Year 2027 Cumulative intersection peak hour volumes (shown in Appendix A). Project Phase I traffic volumes are then added to the Year 2027 Cumulative traffic volumes to develop Year 2027 with Project Phase I Conditions traffic volumes.

This section also documents potential operational deficiencies on the existing circulation network.

The following network improvements are assumed under Year 2027 with Project Phase I scenario:
• Addition of a fourth (south) approach at existing signalized intersection of Rosedale Highway (CA-58) and Northwest Promenade.
• Addition of a fourth (west) approach at existing signalized intersection of Coffee Road and Jet Way.

INTERSECTION ANALYSIS RESULTS
Table 4-1 shows Year 2027 Cumulative Conditions intersection operation analysis results.

Figures 4-1 and 4-2 show intersection turning movement volumes under Year 2027 Cumulative scenarios.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 30 Table 4-1
Year 2027 Cumulative Scenario Intersection Operation Analysis Intersection
Year 2027 Cumulative Year 2027
With Project Phase I
Year 2027
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

1. Patton Way and Rosedale Highway
(CA-58) 8.3 / 8.7 A / A 8.4 / 8.9 A / A

2. Coffee Road and Rosedale Highway
(CA-58) 35.2 / 37.2 D / D 38.5 / 40.2 D
C
/ D
C

3. Northwest Promenade/Project
Driveway D and Rosedale Highway
(CA-58)

6.0 / 8.0 A / A 17.4 / 7.8 B / A

4. El Toro Viejo Road/Clay Patrick Farr
Way and Rosedale Highway (CA-58) 14.3 / 15.1 B / B 14.7 / 16.6 B / B

5. Calloway Drive and Rosedale Highway
(CA-58) 27.5 / 36.0 C / D 29.0 / 38.5 C / D
C

6. Verdugo Lane and Rosedale Highway
(CA-58) 19.3 / 18.7 B / B 20.0 / 20.0 B / B

7. Old Farm Road and Rosedale Highway
(CA-58) 17.2 / 16.8 B / B 17.5 / 17.4 B / B

8. Coffee Road and Brimhall Road 71.0 / 61.4 E / E 73.4 / 65.5 E C
/ E
C

9. Harvest Creek Road and Brimhall Road
– not collector 7.4 / 6.0 A / A 7.6 / 6.3 A / A

10. Calloway Drive and Brimhall Road 24.0 / 24.1 C / C 24.6 / 25.2 C / C

11. Verdugo Lane and Brimhall Road 18.3 / 15.2 B / B 18.7 / 15.3 B / B

12. Jewetta Avenue and Brimhall Road 29.2 / 24.1 C / C 29.5 / 24.7 C / C

13. Old Farm Road and Brimhall Road 16.6 / 13.9 B / B 16.9 / 13.9 B / B

14. Allen Road and Brimhall Road 24.0 / 19.3 C / B 24.1 / 19.4 C / B

15. Coffee Road and Olive Drive 21.8 / 20.5 C / C 22.2 / 20.8 C / C

16. Coffee Road and Hageman Road 20.0 / 21.4 B / C 20.3 / 21.8 C / C

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 31 Intersection
Year 2027 Cumulative Year 2027
With Project Phase I
Year 2027
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

17. Coffee Road and Riverlakes
Drive/Meany Avenue 22.8 / 25.1 C / C 24.2 / 27.3 C / C

18. Coffee Road and Downing Avenue 13.2 / 16.3 B / B 13.5 / 17.1 B / B

19. Coffee Road and Granite Falls Drive 9.9 / 11.2 A / B 10.2 / 11.6 B / B

20. Coffee Road and Jet Way/Project Dwy
G

4.9 / 5.8 A / A 12.1 / 21.1 B / C

21. Coffee Road and Westside Parkway EB
Ramps 6.3 / 5.6 A / A 6.5 / 5.7 A / A

22. Coffee Road and Truxtun Avenue 12.5 / 15.6 B / B 12.9 / 16.5 B / B

23. Coffee Road/Gosford Road and
Stockdale Highway 37.9 / 40.2 D / D 40.3 / 43.9 D
C
/ D
C

24. Calloway Drive and Noriega Road 7.7 / 7.1 A / A 7.7 / 7.1 A / A

25. Calloway Drive and Hageman Road 22.4 / 25.0 C / C 22.6 / 25.4 C / C

26. Callaway Drive and Meacham Road 17.8 / 18.7 B / B 18.3 / 19.4 B / B

27. El Toro Viejo Rd & Project Dwy A
Doesn’t Exist

9.1 / 9.5 A / A

28. Project Dwy B & Rosedale Highway 18.1 / 18.3 C / C

29. Project Dwy C & Rosedale Highway 18.1 / 18.4 C / C

30. Project Dwy E & Rosedale Highway 17.6 / 18.5 C / C

31. Coffee Road & Project Dwy F 20.4 / 23.2 C / C

32. Coffee Road & Project Dwy H 23.7 / 24.2 C / C
Notes:

Bold values indicate intersections operating at LOS D, E or F. (a) Delay refers to the average control delay for the entire intersection, measured in seconds per vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 7th Edition and performed using Synchro 12. (c) Project traffic does not add more than 5 seconds of delay. (d) Change in delay between Year 2027 With Project and Improvement and Year 2027 Cumulative baseline.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 32 Per the analysis results shown in Table 4-1, all analyzed intersections are operating at an acceptable LOS under Year 2027 Cumulative scenario except for the following intersections:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway

INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS
As shown in Table 4-1, the deficient locations with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

Year 2027 Cumulative Baseline and Year 2027 with Project Phase I peak hour analysis worksheets are provided in Appendices C and D, respectively.

ROADWAY SEGMENT CAPACITY ANALYSIS RESULTS
Table 4-2 shows Year 2027 Cumulative Conditions roadway segment capacity analysis results. As shown, all analyzed roadway segments are operating at an acceptable LOS under Year 2027 Cumulative Conditions except at the following locations:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road

ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the Metropolitan Bakersfield General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program. The project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 33 Table 4-2
Year 2027 Cumulative Scenario Roadway Segment Capacity Analysis Roadway Segment Description(a) Classification LOS E Capacity(a) Opening Year 2027 Opening Year 2027 + Project Phase I

ADT V/C LOS ADT V/C LOS
Rosedale Highway (CA-58)
Old Farm Road to Verdugo Lane 4A 4-lane Arterial 40,000 22,291 0.557 C or Better 23,160 0.579 C or Better Verdugo Lane to Calloway Drive 6A 6-lane Arterial 60,000 25,807 0.430 C or Better 27,165 0.453 C or Better Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 6A 6-lane Arterial 60,000 31,762 0.529 C or Better 34,315 0.572 C or Better El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 6A 6-lane Arterial 60,000 33,173 0.553 C or Better 36,324 0.605 C or Better Northwest Promenade to Coffee Road 6A 6-lane Arterial 60,000 34,183 0.570 C or Better 35,867 0.598 C or Better Coffee Road to Patton Way 6A 6-lane Arterial 60,000 30,791 0.513 C or Better 31,389 0.523 C or Better Coffee Road
Olive Drive to Hageman Road 6A 6-lane Arterial 60,000 24,930 0.416 C or Better 25,908 0.432 C or Better Hageman Road to Meany Avenue/Riverlakes Drive 6A 6-lane Arterial 60,000 29,626 0.494 C or Better 30,930 0.516 C or Better Riverlakes Drive/Meany Avenue to Downing Avenue 6A 6-lane Arterial 60,000 36,531 0.609 C or Better 38,269 0.638 C or Better Downing Avenue to Granite Falls Drive 6A 6-lane Arterial 60,000 38,596 0.643 C or Better 40,552 0.676 C or Better Granite Falls Drive to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 36,414 0.607 C or Better 38,478 0.641 C or Better Rosedale Highway (CA-58) to Jet Way 6A 6-lane Arterial 60,000 43,136 0.719 C or Better 45,309 0.755 C or Better Jet Way to Brimhall Road 6A 6-lane Arterial 60,000 43,705 0.728 C or Better 48,594 0.810 D Brimhall Road to Westside Parkway EB Ramps 6A 6-lane Arterial 68,500 b 52,545 0.767 C or Better 54,772 0.800 C or Better Westside Parkway EB Ramps to Truxtun Road 6A 6-lane Arterial 60,000 43,842 0.731 C or Better 45,906 0.765 C or Better Truxtun Road and Stockdale Highway 6A 6-lane Arterial 60,000 52,238 0.871 D 53,868 0.898 D Calloway Drive
Noriega Road to Hageman Road 6A 6-lane Arterial 60,000 26,987 0.450 C or Better 27,422 0.457 C or Better Hageman Road to Meacham Road 6A 6-lane Arterial 60,000 28,102 0.468 C or Better 28,645 0.477 C or Better Meacham Road to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 31,358 0.523 C or Better 32,010 0.534 C or Better Rosedale Highway (CA-58) to Brimhall Road 4A 4-lane Arterial 40,000 38,538 0.963 E 39,353 0.984 E Brimhall Road
Allen Road to Old Farm Road 4A 4-lane Arterial 40,000 8,810 0.220 C or Better 9,245 0.231 C or Better Old Farm Road to Jewetta Avenue 4A 4-lane Arterial 40,000 10,727 0.268 C or Better 11,379 0.284 C or Better Jewetta Avenue to Verdugo Lane 4A 4-lane Arterial 40,000 12,629 0.316 C or Better 13,716 0.343 C or Better Verdugo Lane to Calloway Drive 4A 4-lane Arterial 40,000 15,064 0.377 C or Better 16,259 0.406 C or Better Calloway Drive to Harvest Creek Road 4A 4-lane Arterial 40,000 16,214 0.405 C or Better 17,844 0.446 C or Better Harvest Creek Road to Coffee Road 4A 4-lane Arterial 40,000 16,929 0.423 C or Better 18,667 0.467 C or Better Hageman Road
Calloway Drive to Coffee Road 6A 6-lane Arterial 60,000 25,019 0.417 C or Better 25,128 0.419 C or Better Notes:

Bold values indicate roadway segment capacity resulting in LOS D, E or F (a) Thresholds based on Metropolitan Bakersfield General Plan Circulation Element Page III-4 (2002) (b) Accounts for auxiliary lane (4th southbound lane) capacity, calculated based on HCM6 Equation 19-13 Adjustment for Right Turns at a rate of 1/1.18 = 0.85 applied to the capacity for one lane (60,000 ADT/6 lanes = 10,000 ADT/Lane*.85 = 8500 ADT

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 34 Per the project access vehicular queuing analysis results shown in Table 4-3, the project access points will not experience vehicular excess demand except at Coffee Rd & Project Dwy G/Jet Way intersection. A dual left turn lane with 250 foot lanes is recommended at this location.

Vehicular queue analysis worksheets are provided in Appendix J.

Table 4-3
Opening Year 2027 Project Access Vehicular Queueing Analysis Intersection Movement Lane Length
(ft)
Queue (ft) Excess
Demand
Recommended
Turn Lane Length
AM PM AM PM (ft)

3. Project Dwy D/NW
Promenade &
Rosedale Hwy
EBL 225 59 99 -- -- 225
EBR 400 32 54 -- -- 400
WBL
NBLTR
200 105 149 -- -- 200
200 115 182 -- -- 200

20.Coffee Rd & Project
Dwy G/Jet Wy
EB LTR 400 140 383 -- -- 400
NBL 280 223 485 -- 205 5001
SBR 400 41 58 -- -- 400

27.El Toro Viejo Rd &
Project Dwy A
WBLR 200 55 61 -- -- 200
SBL 200 34 43 -- -- 200

28.Project Dwy B &
Rosedale Hwy
EBR 90 0 0 -- -- 90
NBR 100 45 52 -- -- 100

29.Project Dwy C &
Rosedale Hwy
EBR 250 0 0 -- -- 250
NBR 150 49 57 -- -- 150

30.Project Dwy E &
Rosedale Hwy
EBR 400 0 0 -- -- 400
NBR 150 53 58 -- -- 150

31.Coffee Rd & Project
Dwy F
EBR 200 40 48 -- -- 200
SBR 50 6 7 -- -- 50

32.Coffee Rd & Project
Dwy H EBR 100 38 50 -- -- 100
1 Dual left turn pocket with 250’ lanes

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
SWC Rosedale and Coffee, Bakersfield
Year 2027 Cumulative Peak Hour Volumes
Figure 4-1a
— 18/12
— 447 / 745
C 107/138
C 0/0
- 0/0
C 0/0
7 Old Farm Road & Rosedale Hwy
(CA-58)
o
136 / 256 J
0/0 ->
189/ 155 n)
L
L 90/145
— 710/1255
C 14/59
L 38/24
- 8117 1494
C 2/3
2 Coffee Rd & Rosedale Hwy (CA-58)
L 152/244
- 611/945
C 139 / 244
Rd & Downing 19 Coffee Rd & Granite Falls Dr
L 73/93
- 257 / 325
F 40/49
r
Signalized
L 91 /278
— 519/ 1007
r 20/21
3 t 61/134
— 808/1358
C 0/0
NW Promenade & Rosedale Hwy
(CA-58)
Sig a ized
L 59/78
• 107/124
C 153 / 242
Old -arm Kon0 2 Brmna Ko 14 Allen Road 8 Brimhal Rd
L 43/43
• 551/827
C 220/180
L 100/143
- 161/227
C 148/96
Signalized
144/123 J
817 / 498 -
150/130 1
— 0/0
- 556/870
( 31/61
Signalized
64124
421/251 -
195/161 1
CoTee Ko & Brmna
23/ 19 J
633 / 784 -
242/83 n)
80/111 •
689 / 745 •
20 / 20 )
Ln & Rosedale Hwy (CA-I Patton Wy & Rosedale Hwy (CA-58) 4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
48/101
10/34
85/126
Ave
17/47 J
4/20 -
32/81 1
Coffee Nd & Riverlakes DrMeany
Ave
15 Coffee Rd & Olive Drive Coffee Rd & Hageman Rd 16
L 42/87
— 518/699
F 143/175
49/42 •
1001 463 -
211 /140 •
6/ 10
696/482 -
156/27
Signalized
htr
r
o
33 / 24 J
1142 / 993 -
28/6 n
120/146
1067/1016 -
12/20 "I
67/ 149
1265/1127 =
0/0 "1
0/0 •
0/0 -
0/0 “I
L 12/75
- 0/0
C 60/89
1 9 Harvest Creek Rd & Brimhall Rd 10 Calloway Dr &
)
U 6/20
• 473/664
( 92/54
176/189
696 / 677
o
388 366
t r
ei ei
n
Signalized
43/67 J
91167 -
271 / 191
Coffee Rd & Jet Way
22/39
327/136
377 / 205
Signalized S galized
55/41
593/334 •
25 / 44
173/174
340/230
296/168
Signalized S galized
0/0
765/560 •
31 /58 n)
II 12
P
JIL
Brimhall Rd Verdugo Ln & Brimhall Rd Jewetta Avenue & Brimhall Rd t 233/284
— 309 / 348
C 133/159
t 52/79
— 245/295
C 282/227
Signalized
126 / 241 J
484 / 907 •
161 /365
5 6
t 109/144 $
— 745 / 601
C 309/ 238
Verdugo
58)
Calloway Dr & Rosedale Hwy (CA-58)
O F
J I
Signalized Signa ized Signalized Signalized
38/24
811 / 1494
2/3
Rd
33/24
1142/993 -
28/6 n
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized
Signalized Signalized
Signalized
Signalized
81 /SS^
civi n
177/296
174/ 133 ")
+Z£/9
Oil /SCI
25/36
951/n । n
OS/EE •
U 30/47
t 12/0
f 1 88 / 250
SZI 1 /£801
SLI/81")
C861 167
0/0
901/05“*
C60/80
1215/1361
t 27/41
] 60
ZIl I (XI J
37/ 31
^82/ 52
rH
05 /EE J
Lv/06 n
0/ZI -
C 338 / 179
886/1014
L 18/29
1 P 160/ 151
LZ01/vII
t 26/64
6H / 891 JSI SvL / 669
I /SZI n
(43/68
48/83
582 / 624
473 / 654 -4
162/ 170
8EC /OH
907 / L¥l J
1169/1258
U. 143 / 144
159/70
• £ /9
153 / 35
52/4728/38
34/28 “I
►«l /6SI I
— 170 / 252
I 17/91 “)
ZFH / 6811
49/81
586/ 903
127/ 197
m)
197/ 151 “I191/ 336
9871/•88
198/ 443
o/oJ
Lo/o
4 0/0
— Z81 / EH
92/174 m
129/ 159
— Ill /0£l
887 / 1350
225 / 222
0/00/0 -60/0
258/ 197 “I
1247/1412
289/403
0/0 ")
1227/1448 •
►I/0l•
1584/ 1785
10/0
9 I3L •
4 176 / 98
ti /sin
10/20
23 / 2048 / 32 73/107 ")
1704/1847 •)
0/0
— 181 /vOl
836/1196
172/221
130/44
41 / 3749 /33 -4
87/40 “I
0/0 =
72/51
202 / 354
668/ 1095 =)
242 / 323
Ovl / 16 J
— 254/210
4946/916
SWC Rosedale and Coffee, Bakersfield
Year 2027 Cumulative Peak Hour
Volumes Figure 4-1b
t r
8 57/38 J
87/77 •
180/ 199 1
134/151 J
784 / 520 •
183/ 178 1
©
o-o
x
25 Calloway Dr & Hageman Rd 26
C
O
O
J 1 L.

Calloway Dr & Meacham Rd
t 71/49
— 36/123
C 84/83
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
[
Signalized
21 22 23 24
C O

I L I L I L
[ 1 { 1 { } Signalized Signalized Signalized Signalized J i t r J h t r J i t r J h 1 r 297 / 259 0/0 157/309 200/ 143 0/0 0/0 324/531 0/0
201 / 166 0/0 63/155 243/ 153 T 1 1 1
Coffee Rd & Westside Pkwy EB Ramps Coffee Rd & Truxtun Ave Coffee Rd/Gosford Rd & Stockdale Hwy Calloway Dr & Noriega Road ©
o
©
o
©
o
O
o
O
o
o
o
O
co
©
o
o
t 325/370
— 522/672
C 199 / 306
L 0/0
— 0/0
C 0/0
L 0/0
4- 0/0
C 0/0
©
o
J
2 1
4 1
O O
4 o
o
L
t 68 / 242
— 0/0
C 408/905
?
J
8co
O
Signalized
60/84
677/ 1276
96/ 173
$
Co
380/217
C 92/ 109
4 772 / 805
SWC Rosedale and Coffee, Bakersfield
Year 2027 With Project Phase I Peak Hour Volumes
Figure 4-2a
Signalized
36/29 J
1155/1017 -
31/11 "I
— 21/17
- 455/760
C 113/148
)
C 38/24
- 828/1518
r 2/3
136/256
0/0 =
192/160 n)
Kd & Downing
L 73/93
- 263/335
C 43/54
L 101/297
- 536/1037
C 28/36
6 7 8 Coffee Rd & Brimhall
Old Farm Rd & Rosedale Hwy (CA-58)Verdugo Ln & Rosedale Hwy (CA-58) Signalized
2 Coffee Rd & Rosedale Hwy (CA-58) 3
L 61/134
— 808'1358
C 80/123
NW Promenade/Project Dwy D &
Rosedale Hwy (CA-58)
Tatton YVy & Rosedale Hwy (CA-50)
L 152 / 244
- 657/1016
C 139/244
19 J J L
Coffee Rd & Granite Falls Di
L 0/0
— 0/0
C 0/0
Sig - a ized
L 59/78
- 107/124
( \WI151
Old -arm Ka & Brimna Ko M Allen Road 8 Brimhall Rd
L 43/43
- 551/827
C 230/194
L 100/143
- 164/232
r i5i/IOI
Signalized
144/123 J
817 / 498 -
153/135 1
— 236 / 289
- 330 / 383
C 143/178
23/ 19
646 803
1 242 / 83
L 90/145
— 806/ 1414
C 14/59
48/101
10/34
88/131
Lh
Ave
“I
£
17/47
4/20 »
35/86 )
Coffee Rd & Riverlakes DrMeany
Ave
15 Coffee Rd & Olive Drive Coffee Rd & Hageman Rd 16
L 42/87
— 518/699
C 150/185
49 / 42 J
1001 /463 •
214/145
L 0/0
4 590/929
C 36/71
185 / 194
362 / 265
296/ 168
64/24 •
434/271 -
195/161
6/ 10
718/517 •
156/27 "I
— 55/84
- 254 / 310
C 290 / 242
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
120/146 •
1199/1228 -
90/ 140 "I
67/149 •
1331/1237 -
64/101 "I
42/69 •
0/0 -
204/337 n)
L 12/75
- 0/0
C 60/89
)
9 Harvest Creek Rd & Brimhall Rd 10 Calloway Dr & Brimhall Rd II 12 Verdugo Ln & Brimhall Rd Jewetta Ave & Brimhall Rd — 12/30
- 493/699
C 95/59
Signalized
126 / 241
526 / 970 •
161/365 n)
5 L 132/184
— 780 / 665
g mini
Calloway Dr & Rosedale Hwy (CA-58)
)
Signalized
43/67 J
-
278 / 201 n)
Cofee Kd & Project Dwy Gjet Way
22/39
330/141
377 / 205
Signalized Signalized
55/41
599/344 •
25 / 44
Signalized S gna ized
0/0
790 / 600 •
31/58
IIm
c
N
o
80/111
711 /779
20/20
38/24
828/ 1518
2/3
Rd
Signalized
■
36129 J n t r 242/299
N 738 / 746 *
00 400 / 383
1155/ 1017 -
31/11
a ized SignalizedSign Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized Signalized
Signalized
Signalized
Signalized
Signalized
— EFI /08I
26 / 32
011 / SZI
C 33/ 50
12/0
L 33/52
E /Fl 1
Bl /SSEv/0
05/EE•
L 33/52t 12/0
180/301
08/09 J
•EvliS9I
L27/41
c
ZIl /0EZ •
IE lit
L82/ 52
861 / ISE J
77/ 46
199/ 114
P 188 1 250
1167/ 1256
mi Z91 n
£91/98 J
6/10
901 /0S“)
C44/24
£901 / Z6
L 18/29
I
P 160/ 151
1174/ 1027
L 26/64
C 168/ 149
725 / 783
Sil /SZI "I
(43/68
48/83
595 / 643
— SSI / 0£l
143 / 243
483 / 673
~9/ I l
— 16/4
F271 14
— 8E / IF
52/4728/38
IZZIEZ
45/66
9SI / El l
170 / 2521215/1417
120 / 96 “)
1228/1521
607 / 942 •)
132/ 207
IFE / F6I
— 951 /00£
884/ 1286
198 / 443
C 247 / 206
all
651/ ISI
/ 6£I l
249/ 192 “I
92/ 174 •)
129/ 159
165 / 80
6/ 3 m)
153 / 35
36/60 )
6/10 m)
96/159
— £61 /8SC
1289/ 1481
289 / 403
0/0
1272/1532 •)
P 10/ 14
1614/1827
^46/70
0/03
Lo/o
4 0/0
— 911 /EEI
910/1384

EEE / SEE
IS / 18 •
• 176 / 98
El /SI "I
— EIF/OFE
668/ 1095 =)
tU IlH
641/911 23
L 254/210
4 946 / 916
41 /50 •)48/32
6EI /E8
73/107 ")
1704/1847 •)
253 / 386
— 161 /60E
865/ 1250 =)
177/231
— FS / Lt 1
41 / 37
49/33 -e
94 / 50 “I
0/0 m
72/51
SWC Rosedale and Coffee, Bakersfield
Year 2027 With Project Phase I Peak Hour Volumes
Figure 4-2b
— 342/394
- 522/672
C 199 / 306
— 0/0
- 949/ 1615
C 0/0
— 90/149
- 0/0
C 6/10
164/319
324/ 531
63/ 155 1
23 Coffee Rd/Gosford Rd & Stockdale
Hwy
22 Coffee Rd & Truxtun Ave
L 81/261
— 0/0
C 408 / 905
0/0 •
0/0 •
18/25 ")
32 Coffee Rd & Project Dwy H
1 & Rosedale HwY (CA-L 0/0
- 954/ 1623
C 0/0
30 Project Dwy E & Rosedale Hwy (CA-58)
27 28
Project Dwy B
58)
El Toro Viejo Rd & Project
Driveway A
57 / 38 J
VJ tn •
183/204
26 Calloway Dr & Meacham Rd
L 71/49
— 36/123
C 87 /88
One-Way Stop
0/0 •
1344/ 1372 •
18 / 30
One-Way Stop
0/0 J ht r
R
cq
0/0 •
0/0 ) o
Signalized [Signalized
21 Coffee Rd & Westside Pkwy EB
Ramps
One-Way Stop
0/0
0/0
18/25
Cofee Kd & Project Dwy F
One-Way Stop
Signalized
200/ 143
0/0
246/ 158 1
0/0 J
1444/ 1440 •
26/41 "I
Hageman Rd
L 158 / 294
- 384/827
C 209 / 244
25 Calloway Dr &
314/283
0/0
201 / 166 1
24 Calloway Dr & Noriega Road
& Rosedale Hwy (CA-v 0/0
- 910/1618
C o/o
134/ 151 -
784 / 520 •
186/ 183 "I
29 JIL
9 o
9 o
9 Project Dwy C
58)
0/0 •
1438/ 1447 -
24 / 40
[
Signalized Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
One-Way Stop
S gna ized One-Way Stop CCCIELC.978/ 1767 — 453/ 326 0/0 10/0 4 0/0 ( 98/150 51/115 ~0/0 163/215 “) 1621/1185 243 / 159 L0/0 4 15 18 / 1787 C 369/224 — 0/0
2030/2340 m)
0/0
010 J
4 1878/1866
0/0’1
0/0
1836/2081
0/0
F0/0
5681 / 8991
t 32/51
0/00/0
36/56 63 / 89 “J
• 90EI/H9
99/ 178
L
4 1096 / 1147
( 52/30
55/62
— £6€ / VZL
1632/ 1697
0/0
0/03
1691 / 1863
— 618/680
0/0 w
C
. 0/0
#0/0
380/217
785 / 824
— 92 / 109
0/0
619/ 1 146
106/210
0/0
1713/ 1956
0/0
4 1019/ 1030
^0/0
Sti /til
1 06/«
0/0 •0/0
24 / 40
0/00/0 m)
193/219
Of 6/ 166
89/202
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2028 Cumulative Conditions 39 5.0 YEAR 2028 CUMULATIVE CONDITIONS
This section documents the circulation system conditions within the study area of the project under Year 2028 scenarios. As stated in Chapter 2, compounded annual growth rates were applied to 2025 daily roadway segment counts for 3 years to develop Year 2028 Cumulative segment volumes. These developed volumes and NCHRP Report 255 Directional Volume Method were then applied to 2025 peak hour intersection turning counts to develop Year 2028 Cumulative intersection peak hour volumes. Project Phases I and II traffic volumes are then added to the Year 2028 Cumulative traffic volumes to develop Year 2028 with Project Phases I-II Conditions traffic volumes.

This section also documents potential operational deficiencies on the existing local and regional circulation networks. The following network improvements are assumed under Year 2028 with Project Phases I-II scenario:
• Addition of a fourth (south) approach at existing signalized intersection of Rosedale Highway (CA-58) and Northwest Promenade.
• Addition of a fourth (west) approach at existing signalized intersection of Coffee Road and Jet Way.

INTERSECTION ANALYSIS RESULTS
Table 5-1 shows Year 2028 Cumulative Conditions intersection operation analysis results.

Figures 5-1 and 5-2 show intersection turning movement volumes under Year 2028 Cumulative scenarios.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 40 Table 5-1
Year 2028 Cumulative Scenario Intersection Operation Analysis Intersection Year 2028 Cumulative Year 2028
With Project Phases I-II
Year 2028
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

1. Patton Way and Rosedale Highway (CA-58) 8.3 / 8.7 A / A 8.4 / 9.0 A / A

2. Coffee Road and Rosedale Highway (CA-58) 35.1 / 38.1 D / D 39.1 / 41.7 D C
/ D
C

3. Northwest Promenade/Project Dwy D
and Rosedale Highway (CA-58) 6.0 / 8.0 A / A 16.4 / 22.8 B / C

4. El Toro Viejo Road/Clay Patrick Farr Way
and Rosedale Highway (CA-58) 14.3 / 15.1 B / B 14.7 / 16.9 B / B

5. Calloway Drive and Rosedale Highway (CA-58) 27.7 / 36.2 C / D 29.5 / 39.5 C / D C

6. Verdugo Lane and Rosedale Highway (CA-58) 19.3 / 18.7 B / B 20.1 / 20.3 C / C

7. Old Farm Road and Rosedale Highway (CA-58) 17.3 / 17.0 B / B 17.6 / 17.7 B / B

8. Coffee Road and Brimhall Road 71.8 / 64.5 E / E 74.6 / 68.5 E C
/ E
C

9. Harvest Creek Road and Brimhall Road –
not collector 7.5 / 6.0 A / A 7.7 / 6.4 A / A

10. Calloway Drive and Brimhall Road 24.0 / 24.4 C / C 24.9 / 25.6 C / C

11. Verdugo Lane and Brimhall Road 18.3 / 15.2 B / B 18.8 / 15.4 B / B

12. Jewetta Avenue and Brimhall Road 29.4 / 24.2 C / C 29.8 / 24.8 C / C

13. Old Farm Road and Brimhall Road 16.7 / 13.9 B / B 17.1 / 14.0 B / B

14. Allen Road and Brimhall Road 24.1 / 19.4 C / B 24.2 / 19.5 C / B

15. Coffee Road and Olive Drive 22.0 / 20.6 C / C 22.4 / 21.0 C / C

16. Coffee Road and Hageman Road 20.1 / 21.6 C / C 20.5 / 22.2 C / C

17. Coffee Road and Riverlakes Drive/Meany
Avenue 23.2 / 25.5 C / C 24.8 / 27.2 C / C

18. Coffee Road and Downing Avenue 13.2 / 16.4 B / B 13.7 / 17.5 B / B

19. Coffee Road and Granite Falls Drive 10.0 / 11.2 A / B 10.3 / 11.7 B / B

20. Coffee Road and Jet Way/Project Dwy G 4.9 / 5.8 A / A 13.0 / 32.3 B / C

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2027 Cumulative Conditions 41 Intersection Year 2028 Cumulative Year 2028
With Project Phases I-II
Year 2028
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

21. Coffee Road and Westside Parkway EB
Ramps 6.3 / 5.6 A / A 6.6 / 5.8 A / A

22. Coffee Road and Truxtun Avenue 12.9 / 15.8 B / B 13.3 / 16.8 B / B

23. Coffee Road/Gosford Road and Stockdale
Highway 37.9 / 40.2 D / D 40.8 / 45.0 D
C
/ D
C

24. Calloway Drive and Noriega Road 7.7 / 7.1 A / A 7.7 / 7.2 A / A

25. Calloway Drive and Hageman Road 22.6 / 25.2 C / C 22.9 / 25.7 C / C

26. Callaway Drive and Meacham Road 17.8 / 18.8 B / B 18.4 / 19.7 B / B

27. El Toro Viejo Rd & Project Dwy A
Doesn’t Exist

9.2 / 9.8 A / A

28. Project Dwy B & Rosedale Highway 18.4 / 19.1 C / C

29. Project Dwy C & Rosedale Highway 18.2 / 19.2 C / C

30. Project Dwy E & Rosedale Highway 17.7 / 19.0 C / C

31. Coffee Road & Project Dwy F 20.8 / 24.5 C / C

32. Coffee Road & Project Dwy H 21.5 / 24.7 C / C
Notes:

Bold values indicate intersections operating at LOS D, E or F. (e) Delay refers to the average control delay for the entire intersection, measured in seconds per vehicle. (f) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 7th Edition and performed using Synchro 12. (g) Project traffic does not add more than 5 seconds of delay. (h) Change in delay between Year 2027 With Project and Improvement and Year 2027 Cumulative baseline.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA)
Year 2027 Cumulative Conditions
42 Per the analysis results shown in Table 5-1, all analyzed intersections are operating at an acceptable LOS under Year 2028 Cumulative scenario except for the following:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway

INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS
As shown in Table 5-1, the deficient locations with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

Year 2028 Cumulative Baseline and Year 2028 with Project Phases I-II peak hour analysis worksheets are provided in Appendices E and F, respectively.

ROADWAY SEGMENT ANALYSIS RESULTS
Table 5-2 shows Year 2028 Cumulative Conditions roadway segment capacity analyses results. As shown, all analyzed roadway segments are operating at an acceptable LOS under Year 2028 Cumulative Conditions except at the following locations:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Brimhall Road to Westside Parkway EB Ramps • Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road

ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification per the Metropolitan Bakersfield General Plan with no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program.

The project will provide dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Accordingly, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2028 Cumulative Conditions 43 Table 5-2
Year 2028 Cumulative Scenario Roadway Segment Capacity Analysis Roadway Segment Description(a) Classification LOS E Capacity Opening Year 2028 Opening Year 2028 + Project Phases I & II

ADT V/C LOS ADT V/C LOS
Rosedale Highway (CA-58)
Old Farm Road to Verdugo Lane 4A 4-lane Arterial 40,000 22,292 0.557 C or Better 23,347 0.584 C or Better Verdugo Lane to Calloway Drive 6A 6-lane Arterial 60,000 25,808 0.430 C or Better 27,456 0.458 C or Better Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 6A 6-lane Arterial 60,000 31,762 0.529 C or Better 34,861 0.581 C or Better El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 6A 6-lane Arterial 60,000 33,173 0.553 C or Better 36,997 0.617 C or Better Northwest Promenade to Coffee Road 6A 6-lane Arterial 60,000 34,183 0.570 C or Better 36,227 0.604 C or Better Coffee Road to Patton Way 6A 6-lane Arterial 60,000 30,791 0.513 C or Better 31,516 0.525 C or Better Coffee Road
Olive Drive to Hageman Road 6A 6-lane Arterial 60,000 25,165 0.419 C or Better 26,352 0.439 C or Better Hageman Road to Meany Avenue/Riverlakes Drive 6A 6-lane Arterial 60,000 29,905 0.498 C or Better 31,487 0.525 C or Better Riverlakes Drive/Meany Avenue to Downing Avenue 6A 6-lane Arterial 60,000 36,876 0.615 C or Better 38,986 0.650 C or Better Downing Avenue to Granite Falls Drive 6A 6-lane Arterial 60,000 38,960 0.649 C or Better 41,333 0.689 C or Better Granite Falls Drive to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 36,714 0.612 C or Better 39,219 0.654 C or Better Rosedale Highway (CA-58) to Jet Way 6A 6-lane Arterial 60,000 43,492 0.725 C or Better 46,129 0.769 C or Better Jet Way to Brimhall Road 6A 6-lane Arterial 60,000 44,087 0.735 C or Better 50,021 0.834 D Brimhall Road to Westside Parkway EB Ramps 6A 6-lane Arterial 68,500 b 52,950 0.773 C or Better 55,653 0.812 D Westside Parkway EB Ramps to Truxtun Road 6A 6-lane Arterial 60,000 44,180 0.736 C or Better 46,685 0.778 C or Better Truxtun Road and Stockdale Highway 6A 6-lane Arterial 60,000 52,275 0.871 D 54,253 0.904 E Calloway Drive
Noriega Road to Hageman Road 6A 6-lane Arterial 60,000 27,161 0.453 C or Better 27,688 0.461 C or Better Hageman Road to Meacham Road 6A 6-lane Arterial 60,000 28,134 0.469 C or Better 28,793 0.480 C or Better Meacham Road to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 31,394 0.523 C or Better 32,185 0.536 C or Better Rosedale Highway (CA-58) to Brimhall Road 4A 4-lane Arterial 40,000 38,689 0.967 E 39,678 0.992 E Brimhall Road
Allen Road to Old Farm Road 4A 4-lane Arterial 40,000 8,860 0.222 C or Better 9,387 0.235 C or Better Old Farm Road to Jewetta Avenue 4A 4-lane Arterial 40,000 10,788 0.270 C or Better 11,579 0.289 C or Better Jewetta Avenue to Verdugo Lane 4A 4-lane Arterial 40,000 12,701 0.318 C or Better 14,020 0.351 C or Better Verdugo Lane to Calloway Drive 4A 4-lane Arterial 40,000 15,150 0.379 C or Better 16,600 0.415 C or Better Calloway Drive to Harvest Creek Road 4A 4-lane Arterial 40,000 16,307 0.408 C or Better 18,285 0.457 C or Better Harvest Creek Road to Coffee Road 4A 4-lane Arterial 40,000 17,072 0.427 C or Better 19,182 0.480 C or Better Hageman Road
Calloway Drive to Coffee Road 6A 6-lane Arterial 60,000 25,348 0.422 C or Better 25,480 0.425 C or Better Notes:

Bold values indicate roadway segment capacity resulting in LOS D, E or F (a) Thresholds based on Metropolitan Bakersfield General Plan Circulation Element Page III-4 (2002) (b) Accounts for auxiliary lane (4th southbound lane) capacity, calculated based on HCM6 Equation 19-13 Adjustment for Right Turns at a rate of 1/1.18 = 0.85 applied to the capacity for one lane (60,000 ADT/6 lanes = 10,000 ADT/Lane*.85 = 8500 ADT

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Year 2028 Cumulative Conditions 44 Per the project access vehicular queuing analysis results shown in Table 5-3, the project access points will not experience vehicular excess demand except at Coffee Rd & Project Dwy G/Jet Way intersection. A dual left turn lane with 250 foot lanes is recommended at this location.

Vehicular queue analysis worksheets are provided in Appendix J.

Table 5-3
Opening Year 2028 Project Access Vehicular Queueing Analysis Intersection Movement Lane Length
(ft)
Queue (ft) Excess
Demand
Recommended
Turn Lane Length
AM PM AM PM (ft)

3. Project Dwy D/NW
Promenade &
Rosedale Hwy
EBL 225 61 93 -- -- 225
EBR 400 33 48 -- -- 400
WBL 200 101 196 -- -- 200
NBLTR 200 129 236 -- -- 200

20. Coffee Rd &
Project Dwy G/Jet
Wy
EB LTR 400 142 342 -- -- 400
NBL 280 278 4631
-- 183 5002
SBR 400 44 95 -- -- 400

27. El Toro Viejo Rd &
Project Dwy A
WBLR 200 57 71 -- -- 200
SBL 200 38 48 -- -- 200

28.Project Dwy B &
Rosedale Hwy
EBR 90 0 0 -- -- 90
NBR 100 47 54 -- -- 100

29.Project Dwy C &
Rosedale Hwy
EBR 250 0 0 -- -- 250
NBR 150 46 57 -- -- 150

30.Project Dwy E &
Rosedale Hwy
EBR 400 0 0 -- -- 400
NBR 150 54 58 -- -- 150

31.Coffee Rd & Project
Dwy F
EBR 200 39 56 -- -- 200
SBR 50 10 7 -- -- 50

32.Coffee Rd & Project
Dwy H EBR 100 40 55 -- -- 100
Notes:
1Queue length decreases, but queuing penalty increases
2Dual left turn pocket with 250’ lanes

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
SWC Rosedale and Coffee, Bakersfield
Year 2028 Cumulative Peak Hour Volumes
Figure 5-1a
— 18/12
— 449 / 750
f 105/136
L 91 /278
- 519/1007
r 20/21
U 38/24
- 811/1494
C 2/3
137/258
0/0 =)
189/154 "I
C 0/0
- 0/0
C 0/0
Nd & Downing
7 Old Farm Road & Rosedale Hwy
(CA-58)
Ln & Rosedale Hwy (CA-2 Coffee Rd & Rosedale Hwy (CA-58) 3 NW Promenade & Rosedale Hwy
(CA-58)
t 61 /134
— 808 / 1358
C 0/0
atton VVy & Rosedale Hwy (CA-58)
L 152 / 244
— 610/943
( 140/245
Signa ized
— 59/78
- 106/124
C 155 / 244
L 101/144
- 162/229
c 148/96
U 73/93
- 259 / 327
f 41 /49
Signalized
146/ 124 J
828 / 505 -
152/131 1
Signalized
64124 J
424 / 253 -
196/161 1
C
24/20 J
635/787 -
247 / 87 1
Signa ized
L 89/144
— 710/1254
C 14/60
Lotee Ko & Granite rals Dr
48/101
10/34
85/127
Ave
17/47 J
4/20 -
32/81 1
Coffee nd & Riverlakes DrMeany
Ave
L 43/88
- 526/709
C 144/177
Old -arm Kox0 & Brmna] Ko 14 Allen Road 8 Brimhal Rd
49 / 42 J
1003 464 -
214/143 n)
6/ 10
701/485 •
157 / 27 n)
10 Calloway Dr & Brimhall Rd
6 *
1 J
1 Verdugo
58)
G G
J
80/111
689/745
20/20
5 Calloway Dr & Rosedale Hwy (CA-58)
t 109/143
— 745/600
C 311/239
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
120/146
1067/1016
12/21 n)
67/150
1265/1126 -
0/0 n)
0/0
0/0
0/0 “I
L 12/74
- 0/0
C 60/89
15 Coffee Rd & Olive Drive Coffee Kd & Hageman Kd
t 43/43
- 551/827
C 223/183
22/40
330/138
378 / 206 "I
)
II Verdugo Ln & Brimhall Rd 12 Jewetta Avenue & Brimhall Rd L 52/80
- 267/296
C 284/229
Rd & Brimhall Rd
L 0/0
— 559/875
r 32/62
O
I
JIL
— 234/285
- 311 /35l
C 134/160
C 6/20
— 476 / 668
C 92/54
8 2
Signalized
h 1 r
Coffee Rd & Brimhall Rd
N
o
33124 J
1142/993 *
29/6 1
L 38/24
— 811/1494
r 2/3
O C “
J 1 L
)
Signalized
43/67 •
91 /66 -
272/192 ”1
Coffee Nd & Jet YYay
Signa ized S gna ize :
173/174
342 / 232
298, 169
Signa ized S gna ize:
9 Harvest Creek
Signalized
126 / 240 •
483 / 906 •
162/367 1
Signalized
33124 J n t r 177/189
N 694/676
o
389/368
1142/993 -
29/6 “I
Signalized Signalized Signalized
Signalized
56/42 J
597 / 336 -
25 / 45 1
h
cora
Signalized
h
P
0/0
771 /564 -
32 / 58 1
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized Signalized
Signalized
8 IL—
► /►I n
61/9$^
(338/179
OS/EE •
L 30/47t 12/0
177/296
^0/0
1170/1346
•SC/LI“)
C60/80
1227/ 1375
L 27/41
]
«
P 188 / 250
9El I / >601
SLI /8l n
40/0
C861 168
901 /OS “»
(44/24
895 1 1025
L 18/29
1 ISI / 091
I 175/ 1027
t 26/64
1 f 11 / I&7—
l€ /L=
K/Z8^
U ELI / S9I
142 / 242
476 / 657
159/70
4 €/9
154/35
in/Rz •
26/37
9SI /Zl 1 ")
I 17/91 “)
Z9H / I0ZI
49/81
ISI / 0Z I •
705 / 751
L 177/116
2 — 661 / 611
198/ 152 “I193/ 339
592/911 •)
885/1287
199 / 445
— £81 /*H
92/ 174
6SI /0£l
— ill / HI
891 /1356
227/ 224
( 248 / 207
£971 / Ll l
U. 143/ 144
52/4728/38
34/28 n
6£I / 16•
— 253 / 210
4= 949 / 919
0/00/0 m)0/0
259/ 198
1259/ 1425
SOv/067
U 0/0
1239 /1463 •)
P 10/ 14
1598/ 1801
10/0
( 586 / 627
(43/67
t8/84“l
131 / 45 "I
50/33 •)
9 !U •
86/921^
€1 /SI “I
10/21
24/2150 / 32 73/ 107 n)
1719 /1863 •)
0/0
205/ 182
844 / 1208
174/222
89/41
0/0 m
40/0
(0/0
0/0
— OEI /ELI
— SSE /EOZ
4- Zf / 92
670/ 1098 m)
244 / 325
SWC Rosedale and Coffee, Bakersfield
Year 2028 Cumulative Peak Hour Volumes
Figure 5-1b
23 L C 199/306
200/ 143
0/0
244/ 154 1
Coffee Rd/Gosford Rd & Stockdale Hwy
o
2 t 325/ 370
4- 522/672
r 411/907
C 72/254
— 0/0
Coffee Rd & Truxtun Ave
]
Signalized
t r
©
o
21 Coffee Rd & Westside Pkwy EB Ramps
[
Signalized
0/0
1 0/0
0/0
25 26 Calloway Dr & Hageman Rd Calloway Dr & Meacham Rd t r
©
o
o
□
C
s
24 Calloway Dr & Noriega Road
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
t r 300 / 261
o o
0/0 O ©
203/168 1
[
Signalized
[ ] Signalized i
Signalized
I
Signalized
965/ 1743
C 374/ 214
L 440/301
1478/ 1715
V 0/0
163/215
1599/1153
243/ 159
Co3
0/0
1653/ 1784
U 611/663
60/84
co
677/1277 $
96/174 J
C 52/30
8 C
1078/ 1119
co Co 79 / ss 1
8 192/215
8 2
co
481/911 =>
85/195 J
388 / 222
3 773 / 806
co C 92/ 109
0/0
— 113/145
4= 1016/ 1023
SWC Rosedale and Coffee, Bakersfield
Year 2028 With Project Phases I-II Peak Hour Volumes
Figure 5-2a
L 89/144
- 809 1442
C 14/60
L 38/24
- 830/ 1523
r 2/3
L 152/244
— 660/1025
( 140/245
137/258
0/0 =)
193/160 n
Rd & Downing
146/ 124
828/ 505 •
156/137 n)
Signalized
2 Coffee Rd & Rosedale Hwy (CA-58) 3
NW Promenade/Project Dwy D &
Rosedale Hwy (CA 58)
L 61/134
— 808/1358
C 87 / 142
19 Cofee Rd 8 Granite Falls Dr
Signa ized
L 59/78
— 106/124
C 163 / 256
L 101/144
— 165/235
P 151/102
L 133/191
— 783/678
( 331/281
1 Patton Wy & Rosedale Hwy (CA-58) 4
El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
48/101
10/34
89/133
Ave
17/47 .
4/20 -
36/87 1
Coffee Rd & Riverlakes DrMeany
Ave
• 43/88
- 526/709
( 152/189
L 43/43
- 551 /827
C 235 / 201
14 Allen Road 8 Brimhal Rd
49/42 •
1003 / 464 -
218/149 n)
Signalized
64 / 24 J
440 / 277
196/ 161
6/ 10
729/527 •
157 / 27 "I
10 Calloway Dr & Brimhall Rd
" 12/32
- 497 / 710
C 95/60
Signalized
n t r
*
N
o
36 / 30 J
1156/1023 -
32/12 "I
24/20 J
651 /8l1 -
247 / 87 n)
L 38/24
- 830/ 1523
r 2/3
120/ 146
1217/ 1266 •)
99/161 n)
67/150
1335/ 1257 =)
72/118 )
44/81 •
0/0 -
212/397
L 12/74
— 0/0
C 60/89
CoTeo Ko & Orve Drive Coffee Kd & Hageman Kd
22/40
334/144
378 / 206
Signalized
Brimhall Nd
t 73/93
— 265/339
C 44/55
)
Signalized
)
11 Verdugo Ln & Brimhall Rd 12 Jewetta Ave & Brimhall Rd t 55/86
— 256/314
r 293 1247
Rd & Brimhall Rd
t 0/0
- 595/947
( 38/74
U 238/291
- 332/393
C 145/184
1 5 6 7 8 Coffee Rd & Brimhall Rd
Old Farm Rd & Rosedale Hwy (CA-58)Calloway Dr & Rosedale Hwy (CA-58)Verdugo Ln & Rosedale Hwy (CA-58) C $
*
L 21/18
— 458 / 768
C 111 / 148
L 102 / 302
- 537/1043
C 29/39
— Lh “
J l L
246/318
737/758
o
402/391
t r
ei ei
1 Signalized
43/67 •
91 /66 -
280 1 204 n
Coffee Kd & Project Dwy Gjet WVay
Signalized S gnalized
13 Old Farm Rd &
189/198
370 / 274
298/169
Signalized S gnalized
9 Harvest Creek
80/111
717/787
20/20
Signalized Signalized S gnalized
126 / 240 J
535 / 983 -
162/367 1
Signalized Signalized Signalized Signalized
56/42
605 / 348 •
25/45
0/0
803 /612 •
32 / 58 n)
36/30
1156/ 1023 -
32/12 “I
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized Signalized IZZ/EZZ •48/72 9SI /II I ") OS/EE • U 34/53
t 12/0
C 86/168
7/12
901 /0S“)
180/302
^60/80
1287/ 1464
L 27141
3 C SH/961
OSC / 881 •
1188/ 1289
L 165 / 235
f 0/0
1238/ 1447
•S I UI
I
939/ 1090
L 18/29
1 P 160/151
1175/1027
L 26/ 64
174/ 191 )145
487 / 681
/ 248
Ull KE •
77/ 46
199/ 114
120 / 97 “)
1245/ 1552
52/87
151 / 0ZI •
737 / 798
911 /ZZI t
ai
(43/67
602/650
88/8")
202/ 158
615 / 959 •)
135/211
L8Zl / 588
199/ 445
252/ 195
167/82 )
92/ 174 m)
E /9
154/35
— 811 /SEI
Z6EI/ 616
227 / 224
P 248 / 207
1185 / 1287
Z91/ZSI n
91 161J
11 / 6 •
+191 —
181 / 142 n)
26/32
511 /6Z1
— OvIZ
28/38
/►/IS
38/70
6/12
881/66
259/ 198 “I
1303 / 1506
290 / 405
U 0/0
1289/1565
P 10/14
1636/ 1859
18/ IS
139/57
50/33 m)
C86/Z
97/53 n)
0/0 m
72/51
4 176 / 98
(83/52
€1 /SI "I U 34/ 53
t 12/0
P 33/ 50
43 / 56 m)
50 / 32 ")
85/ 161
73/ 107 •)
1719/1863 •)
211/194275/446
4 ►ZII/9Z8
180/234
C 231 / 113
37/ 31
— 82/53
0/0 J
~0/0
4=0/0
251/426 )
670/ 1098 m)
244/ 325 1
Z8I /EZI •
— 253 / 210
4 949 / 919
SWC Rosedale and Coffee, Bakersfield
Year 2028 With Project Phases I-II Peak Hour Volumes
Figure 5-2b
27 28
El Toro Viejo Rd & Project
Driveway A
Project Dwy B
58)
— 344/399
- 522 / 672
C 199 / 306
One-Way Stop
0/0 J h i r
r
3 31 Coffee Rd & Project Dwy F
0/0 •
0/0 )
9 o
166/321
324 / 531
63/ 155 1
23 24 Calloway
Coffee Rd/Gosford Rd & Stockdale
Hwy
22 Coffee Rd & Truxtun Ave
L 88 / 277
— 0/0
C 411/907
0/0 •
0/0 •
19/35
32 Coffee Rd & Project Dwy H
0/0 •
0/0 •
19/35
Meacham Rd
t 71/49
— 36/123
C 88/89
0/0 J
1461 / 1471 •
29/48 ")
Calloway Dr &
Signalized Signalized
21 Coffee Rd & Westside Pkwy EB
Ramps
One-Way Stop One-Way Stop
57 / 38 -
87 / 77 •
185 / 206 "I
200/ 143
0/0
248/ 160 1
319/290
0/0
203 / 168 1
Dr & Noriega Road
L 0/0
— 0/0
C 0/0
o
o
L
30 JIL
One-Way Stop-0/0 J h t r
2 8
O
o
D
o
D
o
O
o
Project Dwy E & Rosedale Hwy (CA-58)
L 0/0
— 956 / 1634
C 0/0
1347/ 1398 •
21/36)
& Rosedale Hwy (CA-L 0/0
- 957/1652
C 0/0
Signalized
Hageman Rd
L 161/301
— 388 / 836
C 211/246
25 Calloway Dr &
135/153 J
793 / 527 •
186/ 183 “I
29 JIL
6 D
o
Project Dwy C
58)
0/0 J
1450/ 1477 •
28 /48 ")
—
& Rosedale wy (CA-9
L 0/0
— 912/ 1646
C 0/0
t r
o •
0 —
Signalized Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized One-Way Stop
One-Way Stop
0/0 J
C 2
L 0/0
4 0/0
R
SL1/601
52 / I 18
•
— 0/0
1773
— 455/331
163/215 )
1626/1 194
243 / 159
Lo/o4- 1521 / 1805
( 385/238
1- 0/0
2067 / 2416
0/0
0/0 J
Lo/o
4 1726/1898
0/0
36/60
1679/ 1865
J
0/0 ")
• 6OIZ/ZS8I
0/0
— 06/(9
695/1313 =)
99/180
724 / 397
1648/ 171 5
0/0
1 52/30
SSI I / Wil
L 55/62
1 0/0
1707/1898
J
— 625 / 693
L 113/145
4 1028/ 1041
0/0 ")
1735/1989
0/0
r 388/222
789 / 830
601/16 1
— 0/0
9SI1 /S79
107/212
24/48 ")
0/00/0 493/935
195/221 ")
88/201
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 49 6.0 BUILDOUT YEAR 2046 CONDITIONS
This section documents the circulation system conditions within the study area of the project under Buildout Year 2046 scenarios. As stated in Chapter 2, compounded annual growth rates were applied to 2025 daily roadway segment counts for 21 years to develop Buildout Year 2046 segment volumes.

These developed volumes and NCHRP Report 255 Directional Volume Method were then applied to 2025 peak hour intersection turning counts to develop Buildout Year 2046 intersection peak hour volumes (shown in Appendix A). Project Phases I and II traffic volumes are then added to the Buildout Year 2046 traffic volumes to develop Buildout Year 2046 with Project Phases I-II Conditions traffic volumes.

This section also documents potential operational deficiencies on the existing local and regional circulation networks. The following network improvements are assumed under Buildout Year 2046 with Project Phases I-II scenario:
• Addition of a fourth (south) approach at existing signalized intersection of Rosedale Highway (CA-58) and Northwest Promenade.
• Addition of a fourth (west) approach at existing signalized intersection of Coffee Road and Jet Way.

INTERSECTION ANALYSIS RESULTS
Table 6-1 shows Buildout Year 2046 Conditions intersection operation analysis results.

Figures 6-1 and 6-2 show intersection turning movement volumes under Buildout Year 2046 scenarios.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 50 Table 6-1
Buildout Year 2046 Scenario Intersection Operation Analysis Intersection
Buildout Year 2046 Buildout Year 2046
With Project Phases I-II
Buildout Year 2046
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

1. Patton Way and Rosedale Highway (CA-58) 8.3 / 8.6 A / A 8.4 / 8.8 A / A

2. Coffee Road and Rosedale Highway (CA-58) 37.1 / 47.0 D / D 37.9 / 51.3 D c
/ D
c

3. Northwest Promenade/Project Driveway
and Rosedale Highway (CA-58) 6.0 / 8.2 A / A 15.9 / 22.3 C / C

4. El Toro Viejo Road/Clay Patrick Farr Way
and Rosedale Highway (CA-58) 14.3 / 15.7 B / B 14.6 / 17.9 B / B

5. Calloway Drive and Rosedale Highway (CA-58) 32.9 / 40.7 C / D 36.1 / 43.4 D c
/ D
c

6. Verdugo Lane and Rosedale Highway (CA-58) 19.7 / 19.0 B / B 20.6 / 20.7 C / C

7. Old Farm Road and Rosedale Highway (CA-58) 18.5 / 18.5 B / B 18.6 / 19.1 B / B

8. Coffee Road and Brimhall Road 74.0 / 92.2 E / F 77.1 / 96.5 E c
/ F
c

9. Harvest Creek Road and Brimhall Road –
not collector 8.2 / 6.7 A / A 8.5 / 7.1 A / A

10. Calloway Drive and Brimhall Road 24.4 / 28.1 C / C 25.2 / 29.4 C / C

11. Verdugo Lane and Brimhall Road 18.9 / 15.2 B / B 19.3 / 15.4 B / B

12. Jewetta Avenue and Brimhall Road 29.6 / 24.8 C / C 30.0 / 25.4 C / C

13. Old Farm Road and Brimhall Road 17.1 / 14.2 B / B 17.4 / 14.2 B / B

14. Allen Road and Brimhall Road 27.5 / 22.1 C / C 27.9 / 22.2 C / C

15. Coffee Road and Olive Drive 25.8 / 22.3 C / C 26.3 / 22.9 C / C

16. Coffee Road and Hageman Road 24.5 / 25.6 C / C 25.1 / 26.4 C / C

17. Coffee Road and Riverlakes Drive/Meany
Avenue 27.8 / 31.4 C / C 30.1 / 34.6 C / C

18. Coffee Road and Downing Avenue 14.7 / 16.4 B / B 15.5 / 17.1 B / B

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 51 Intersection
Buildout Year 2046 Buildout Year 2046
With Project Phases I-II
Buildout Year 2046
With Project and
Improvement
Δ
Delay (d)
Delay (a) LOS (b) Delay (a) LOS (b) Delay (a) LOS (b)
AM Peak/PM Peak

19. Coffee Road and Granite Falls Drive 10.3 / 12.7 B / B 10.8 / 13.8 A / C

20. Coffee Road and Jet Way/Project Driveway 4.9 / 6.2 A / A 13.2 / 33.1 B / C

21. Coffee Road and Westside Parkway EB
Ramps 7.2 / 6.5 A / A 7.5 / 7.0 A / A

22. Coffee Road and Truxtun Avenue 17.8 / 20.7 B / C 18.3 / 22.1 B / C

23. Coffee Road/Gosford Road and Stockdale
Highway 37.9 / 40.2 D / D 42.4 / 43.9 D
c
/ D
c

24. Calloway Drive and Noriega Road 7.8 / 7.3 A / A 7.9 / 7.3 A / A

25. Calloway Drive and Hageman Road 28.7 / 29.0 C / C 29.2 / 29.3 C / C

26. Callaway Drive and Meacham Road 18.4 / 19.5 B / B 18.8 / 20.5 B / C

27. El Toro Viejo Rd & Project Dwy A
Doesn’t Exist

9.3 / 10 A / B

28. Project Dwy B & Rosedale Highway 17.8 / 19.1 C / C

29. Project Dwy C & Rosedale Highway 17.7 / 19.2 C / C

30. Project Dwy E & Rosedale Highway 17.2 / 18.7 C / C

31. Coffee Road & Project Dwy F 23.7 / 31.7 C / D

32. Coffee Road & Project Dwy H 24.1 / 33.4 C / D
Notes:

Bold values indicate intersections operating at LOS D, E or F. (a) Delay refers to the average control delay for the entire intersection, measured in seconds per vehicle. (b) LOS calculations are based on the methodology outlined in the Highway Capacity Manual 7th Edition and performed using Synchro 12. (c) Project traffic does not add more than 5 seconds of delay. (d) Change in delay between Buildout Year 2046 With Project and Improvement and Buildout Year 2046 baseline.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 52 Per the analysis results shown in Table 6-1, all analyzed intersections are operating at an acceptable LOS under Year 2046 Cumulative scenario except for the following:

2. Coffee Road and Rosedale Highway (CA-58)

5. Calloway Drive and Rosedale Highway (CA-58)

8. Coffee Road and Brimhall Road

23. Coffee Road/Gosford Road and Stockdale Highway

31. Coffee Road & Project Dwy F

32. Coffee Road & Project Dwy H
Project driveways operating at LOS D are considered acceptable.

INTERSECTION DEFICIENCIES AND RECOMMENDED IMPROVEMENTS
As shown in Table 6-1 for street intersections 2, 5, 8, and 23, the deficient locations with the addition of the proposed project will not add more than 5 seconds of delay. Therefore, no transportation improvements are recommended at these locations.

As shown in Table 6-1 for project driveways intersections 31 and 32, the installation of traffic signals at these intersections will improve the operations.

Table 6-2 shows the effectiveness of implementing this improvement; however, a traffic signal is not warranted at either location. Therefore, no improvements are recommended.

Table 6-2
Buildout Year 2046 With Improvements Intersection Operation Analysis Intersection
Buildout Year 2046
With Project Phases I-II
Buildout Year 2046
With Project Phases I-II
With Improvements
Delay (a) LOS (b) Delay (a) LOS (b)
AM/PM Peak

31. Coffee Road & Project Dwy F 23.7 / 31.7 C / D 2.1/2.3 A/A

32. Coffee Road & Project Dwy H 24.1 / 33.4 C / D 1.8/1.9 A/A Buildout Year 2046 Baseline and Buildout Year 2046 with Project Phases I-V peak hour analysis worksheets are provided in Appendices G and H, respectively. Improvement peak hour analysis worksheet and signal warrants are provided Appendix I.

ROADWAY SEGMENT ANALYSIS RESULTS
Table 6-3 shows Buildout Year 2046 Conditions roadway segment capacity analysis results. As shown, all analyzed roadway segments are operating at an acceptable LOS under Year 2046 Cumulative Conditions except at the following locations:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Brimhall Road to Westside Parkway EB Ramps

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 53 • Coffee Road between Westside Parkway EB Ramps to Truxtun Road • Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway (CA-58) to Brimhall Road

ROADWAY SEGMENT DEFICIENCIES AND RECOMMENDED IMPROVEMENTS The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification per the Metropolitan Bakersfield General Plan with no additional improvements are identified for these segments in the Bakersfield Regional Transportation Impact Fee (RTIF) Program.

The project will provide dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Accordingly, no additional improvements are recommended.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the Metropolitan Bakersfield General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements are recommended.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 54 Table 6-3
Buildout Year 2046 Scenario Roadway Segment Capacity Analysis Roadway Segment Description(a) Classification LOS E Capacity Buildout Year 2046 Buildout Year 2046 + Project Phases I & II

ADT V/C LOS ADT V/C LOS
Rosedale Highway (CA-58)
Old Farm Road to Verdugo Lane 4A 4-lane Arterial 40,000 22,295 0.557 C or Better 23,350 0.584 C or Better Verdugo Lane to Calloway Drive 6A 6-lane Arterial 60,000 25,812 0.430 C or Better 27,460 0.458 C or Better Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 6A 6-lane Arterial 60,000 31,767 0.529 C or Better 34,866 0.581 C or Better El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 6A 6-lane Arterial 60,000 33,179 0.553 C or Better 37,003 0.617 C or Better Northwest Promenade to Coffee Road 6A 6-lane Arterial 60,000 34,189 0.570 C or Better 36,233 0.604 C or Better Coffee Road to Patton Way 6A 6-lane Arterial 60,000 30,796 0.513 C or Better 31,521 0.525 C or Better Coffee Road
Olive Drive to Hageman Road 6A 6-lane Arterial 60,000 29,403 0.490 C or Better 30,590 0.510 C or Better Hageman Road to Meany Avenue/Riverlakes Drive 6A 6-lane Arterial 60,000 34,941 0.582 C or Better 36,523 0.609 C or Better Riverlakes Drive/Meany Avenue to Downing Avenue 6A 6-lane Arterial 60,000 43,085 0.718 C or Better 45,195 0.753 C or Better Downing Avenue to Granite Falls Drive 6A 6-lane Arterial 60,000 45,521 0.759 C or Better 47,894 0.798 C or Better Granite Falls Drive to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 42,111 0.702 C or Better 44,616 0.744 C or Better Rosedale Highway (CA-58) to Jet Way 6A 6-lane Arterial 70,000 49,886 0.713 C or Better 52,523 0.750 C or Better Jet Way to Brimhall Road 6A 6-lane Arterial 70,000 50,966 0.728 C or Better 56,900 0.813 D Brimhall Road to Westside Parkway EB Ramps 6A 6-lane Arterial 68,500 b 60,245 0.879 D 62,948 0.919 E Westside Parkway EB Ramps to Truxtun Road 6A 6-lane Arterial 60,000 50,267 0.838 D 52,772 0.880 D Truxtun Road and Stockdale Highway 6A 6-lane Arterial 60,000 52,935 0.882 D 54,913 0.915 E Calloway Drive
Noriega Road to Hageman Road 6A 6-lane Arterial 60,000 30,294 0.505 C or Better 30,821 0.514 C or Better Hageman Road to Meacham Road 6A 6-lane Arterial 60,000 28,716 0.479 C or Better 29,375 0.490 C or Better Meacham Road to Rosedale Highway (CA-58) 6A 6-lane Arterial 60,000 32,044 0.534 C or Better 32,835 0.547 C or Better Rosedale Highway (CA-58) to Brimhall Road 4A 4-lane Arterial 40,000 41,402 1.035 F 42,391 1.060 F Brimhall Road
Allen Road to Old Farm Road 4A 4-lane Arterial 40,000 9,766 0.244 C or Better 10,293 0.257 C or Better Old Farm Road to Jewetta Avenue 4A 4-lane Arterial 40,000 11,891 0.297 C or Better 12,682 0.317 C or Better Jewetta Avenue to Verdugo Lane 4A 4-lane Arterial 40,000 14,000 0.350 C or Better 15,319 0.383 C or Better Verdugo Lane to Calloway Drive 4A 4-lane Arterial 40,000 16,699 0.417 C or Better 18,149 0.454 C or Better Calloway Drive to Harvest Creek Road 4A 4-lane Arterial 40,000 17,974 0.449 C or Better 19,952 0.499 C or Better Harvest Creek Road to Coffee Road 4A 4-lane Arterial 40,000 19,640 0.491 C or Better 21,750 0.544 C or Better Hageman Road
Calloway Drive to Coffee Road 6A 6-lane Arterial 60,000 31,279 0.521 C or Better 31,411 0.524 C or Better Notes:

Bold values indicate roadway segment capacity resulting in LOS D, E or F (a) Thresholds based on Metropolitan Bakersfield General Plan Circulation Element Page III-4 (2002) (b) Accounts for auxiliary lane (4th southbound lane) capacity, calculated based on HCM6 Equation 19-13 Adjustment for Right Turns at a rate of 1/1.18 = 0.85 applied to the capacity for one lane (60,000 ADT/6 lanes = 10,000 ADT/Lane*.85 = 8500 ADT

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Buildout Year 2046 Conditions 55 Per the project access vehicular queuing analysis results shown in Table 6-4, the project access points will not experience vehicular excess demand except at Coffee Rd & Project Dwy G/Jet Way intersection. A dual left turn lane with 250 foot lanes is recommended at this location.

Vehicular queue analysis worksheets are provided in Appendix J.

Table 6-4
Buildout Year 2046 Project Access Vehicular Queueing Analysis Intersection Movement Lane Length
(ft)
Queue (ft) Excess
Demand
Recommended
Turn Lane Length
AM PM AM PM (ft)

3. Project Dwy D/NW
Promenade &
Rosedale Hwy
EBL 225 63 97 -- -- 225
EBR 400 30 53 -- -- 400
WBL 200 99 147 -- -- 200
NBLTR 200 119 214 -- -- 200

20. Coffee Rd &
Project Dwy G/Jet
Wy
EB LTR 400 151 311 -- -- 400
NBL 280 306 443
1 26 163 5002
SBR 400 43 136 -- -- 400

27. El Toro Viejo Rd &
Project Dwy A
WBLR 200 51 68 -- -- 200
SBL 200 42 61 -- -- 200

28.Project Dwy B &
Rosedale Hwy
EBR 90 0 0 -- -- 90
NBR 100 45 57 -- -- 100

29.Project Dwy C &
Rosedale Hwy
EBR 250 0 0 -- -- 250
NBR 150 46 57 -- -- 150

30.Project Dwy E &
Rosedale Hwy
EBR 400 0 0 -- -- 400
NBR 150 52 59 -- -- 150

31.Coffee Rd & Project
Dwy F
EBR 200 40 75 -- -- 200
SBR 50 0 27 -- -- 50

32.Coffee Rd & Project
Dwy H EBR 100 43 54 -- -- 100
Notes:
1Queue length decreases, but queuing penalty increases
2Dual left turn pocket with 250’ lanes

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
SWC Rosedale and Coffee, Bakersfield
Buildout Year 2046 Peak Hour Volumes
Figure 6-1a
— 80/101
- 288 / 362
g 44/53
153/284
0/0 •)
191 /151 n)
C 52/109
- 665/896
C 176/216
V 40/25
- 810/1492
P 2/3
19 L 0/0
— 0/0
L C 0/0
Rd & Downing
— 36/36
- 557/837
C 280 / 237
L 110/156
- 186 / 263
r 156/101
Signalized
174/ 149
1042 / 638 -
180/154 1
2 Coffee Rd & Rosedale Hwy (CA-58) 3
L 63/137
— 8071 1355
C 0/0
NW Promenade & Rosedale Hwy
(CA-58)
Patton Wy & Rosedale Hwy (CA-58)
L 161/258
- 586 907
C 154/268
Coteo Ka & Grane rals Dy
Signa ized
25/44
377/159
402/221
13 Old Farm Road & Brimhall Rd Allen Road & Brimhall Rd 14 15 Coffee Rd & Olive Drive 16 Coffee Rd & Hageman Rd 42/35 •
1031 /465 •
275/184 "I
— 0/0
• 619/965
C 46/89
— 100/134
• 730 / 585
C 339/262
L 86/140
- 705/1243
C 20/86
50/107
9/33
91 / 137
Ave
18/50 J
4/19 -
35/88 1
17 1 LJ
t 61 (80
— 103/120
C 1761 275
Coffee Rd & Riverlakes Dr/Meany
Ave
"I
9 Harvest Creek Rd & Brimhall Rd 10 Calloway Dr &
67/35 J
473/333 -
214/115
6/ 10 •
789 / 541 -
1 159 / 27 n
5 6 7 8 Coffee Rd & Brimhall Rd
Old Farm Road & Rosedale Hwy
(CA-58)
Calloway Dr & Rosedale Hwy (CA-38)Verdugo Ln & Rosedale Hwy (CA-58) Signalized
34 1 25 J
1141 /99l .
36/33 J
671 /834 -
338/158
— 40/25
- 810/ 1492
r 2/3
— 14/8
- 479 / 825
r 74/97
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
119/148
1053/1009 -
17/30 "I
69/153 •
1263/ 1123 -
0/0
L 11/73
— 0/0
C 64/96
Signalized Signalized Signalized
60145 J
663 / 373 -
27 148 1
C 6/21
- 537 / 741
r 92/55
— 92/280
- 518/1005
r 20/21
Signalized
43/69 •
861 63 =
303 / 215 “I
Cofee Kd & Jet ay
182/ 182
381 /259
336/192
Signalized S gna ized
0/0
862 / 636 -
34/62 n)
11 12
D Ln
JIL
Brimhall Rd Verdugo Ln & Brimhall Rd Jewetta Avenue & Brimhall Rd I
t 249 / 301
— 346/ 389
C 153/184
t 55/117
— 275 / 387
C 312/165
81/112
687/744
20/20
Signalized Signalized Signalized
119/225 J
473 / 883 -
181 1402 1
Signalized
h i r 182/196
N 662 / 645
o
417/393
34/25 J
1141/991 -6
29/6 1
Signalized Signalized Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized Signalized
Signalized Signalized P 174/165 1 187/ 1041 L 29/ 71 178/298 f34/52 0/€ 1 ■*
L 31/49
C63/84
1445/ 1625
•• 191 t
60 UI fISlJ
89/ 57
40/ 33
C 209 / 187
898 / •18
— 211 / 139
85 lit •
640 / 692
—42/ 71
213 / 222
4 802 /8IS
lit /S8I
p 198 / 265
1290/ 1345
1132/183
p88/ 171
0/0
51/109
— 6>/ EFI
53,35 •
157/ 243
685 / 1055 •)
207/ 161230/402
897 /1306
212/479
40/0
po/o
0/0
p 340/ 180
78/ 47
SI I 7 001 "I
p 216 / 215
37/53
BSI / El l
1368 /1570
— 190 / 285
126 / 98 “)
1412/1724
53/89
1065/1218
OE/81
p264/2l9
1264/ 1361
661 / OS I
267/ 131 “I
95/ 137 •)
141/ 112
160 / 72
6/3 =)
157/35
150/ 129 “)
6Srl / 656
254 / 253
Otl iv
4 1002/967
961 / 0H •)
0/2 1
• 1 /v
G
L 68/ 191
30/34
206/ 207
—8liv
52/4729/39
EE /&—
8 /sz“
8 /9=
— 0/0
0/00/0 -4
283/215
1479 / 1677
310/434
(1 /6
1853 / 2069
•
Lo/o
45/41 1
p83/ 68
84/181 =)
— 16/ 19
— 88E /on
704 / 1 153
L31/49— 13/0
p 34/ 52
14/30
34 / 30 •)
70/46
229/201
1002 / 1433 ■*
194/248
126/61
0/0 m
76/55 P SSE ULl
— CI 1 /9Z
1974 / 2149 •)
0/0
L 0/0
1454/1726 ••
SWC Rosedale and Coffee, Bakersfield
Buildout Year 2046 Peak Hour Volumes
Figure 6-1b
21 22 23 24

I L JIL
I { } Signalized Signalized
J n t r J
i t r 349 / 304 0/0 161/315 207/ 146 J n t r J hI6
0/0 0/0 327/535 0/0
1 1 1 1 O
248 / 205 0/0 63/154 268/ 170
Coffee Rd & Westside Pkwy EB Ramps Coffee Rd&T ruxtun Ave Coffee Rd/Gosford Rd & Stockdale Hwy Calloway Dr & Noriega Road O
o
O
o
O
o
O
o
o
o
L 332/ 378
— 526/678
C 199 / 305
L 0/0
— 0/0
C 0/0
3 Signalized Signalized
25 26
O
J 1 L J I L
} { Signalized Signalized
150/ 173 J i t r a 1 r
S
184 / 203 1
XX/XX AM / PM Peak Hour Volumes
I
Calloway Dr & Hageman Rd Calloway Dr & Meacham Rd
58/39
959/642 • 89/78
165/158 1
50 CO

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
t 227/417
— 472/ 1007
C 238 / 264
L 72/50
— 37/125
C 86/85
t 449 / 307
co
659 / 380
0/0
0/0
— 725 / 786
SWC Rosedale and Coffee, Bakersfield
Buildout Year 2046 With Project Phases I-II Peak Hour
Volumes Figure 6-2a
L 110/156
- 189 / 269
P 159/107
14 Allen Road & Brimhall Rd
25 / 44 •
381 1 165 -
402/221 n)
Brimhall nd
L 80/101
— 294/374
( 47159
— 40/25
- 829/1521
C 2/3
Rd & Downing
42/35 •
1031 /465 -
279/190 n)
L 36/36
- 557/837
C 292 / 255
10 II Calloway Dr & Brimhall Rd Verdugo Ln & Brimhall Rd atton VVy & Rosedale Hwy (CA-58) 2 Coffee Rd & Rosedale Hwy (CA-58) L 161/258
- 636 / 989
( 154/268
Signa ized
Signalized
15 Coffee Rd & Olive Drive
12 L 58/123
— 284/405
( 321/183
— 17/14
— 488 / 843
P 80/ 109
L 103 / 304
- 536/1041
C 29/39
L 86/140
— 804/1431
C 20/86
3 L 63/137
— 807/ 1355
C 87/ 142
NW Promenade/Project Dwy D &
Rosedale Hwy (CA-58)
19 153/284
§
00 Coffee Rd & Granite Falls Dr
L 0/0
— 0/0
C 0/0
0/0 =
195/157 1
L
50/107
9/33
95 /143
‘I
2 Ave
18/50 J
At 19 ->
39/94 1
17 J I L
t 61 /80
— 103/120
C 184/287
Coffee Rd & Riverlakes Dr/Meany
Ave
13 Old Farm Rd &
9 Harvest Creek
Signalized
67/35 J
489 / 357 -
214/115
6/ 10
817/583 •
159 / 27 "I
& Brimhall Kd
L 12/33
- 558 / 783
P 95/61
Signalized
* G
37/31 J
1155/1021 -
32/12 1
36/33 J Ir
687 / 858 -
338/158
4 El Toro Viejo Rd/Clay Patrick Farr
Wy & Rosedale Hwy (CA-58)
119/148
1203/1259 -
104/170 n)
69/153
1333/1254 -
72/118 ")
44/81 •
0/0 -
212/397 “I
L 11/73
- 0/0
C 64/96
L 52/109
- 665 / 896
( 184 / 228
1 Rd & Brimhall Rd
L 0/0
— 655/1037
( 52/101
L 253 / 307
- 367 / 431
C 164 / 208
8 Rosedale Hwy (CA-Coffee Rd & Brimhall Rd
L 40/25
- 829/1521
r 2/3
81 /112
715/786
20/20 "I
5 6 7
Old Farm Rd &
58)
Calloway Dr & Rosedale Hwy (CA-58)Verdugo Ln & Rosedale Hwy (CA-58) L 124/182
- 768 / 663
r 359/304
1 S gna ized
43 / 69 •
86163 =
311 /227 T.

Coffee Kd & Project Dwy Gjet Way
Signalized
174/149
1042 / 638 •)
184/160 ")
60/45
671 / 385 •
27/48 n)
Coffee Kd & Hageman Kd
198 / 206
409/301
336/ 192
Signalized 5 gna ized
Signalized Signalized Signalized
119 / 225 J
525 / 960 =
181 1402 1
Signalized
n t r 251 / 325
705 / 727 *
430/416
37/31 J
1155/1021
32/ 12 1
SignalizedSigna ized Signalized
Signalized
0/0 J h
894 / 684 -
34/62 1
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Signalized
Signalized Signalized
Signalized
P 174/ 165
1187/ 1041
U 29/ 71
21 1/167 “)
897 / 1306
212/479
L 35/55 — 13/0
- 34/52
C63/84
1505/ 1714
L 28/44
] T«
188/ 317
851 a J
42/71
656/715
(264/219
1275/1385
Z9I / 65 I n
P 198/265
1384/ 1498
L 169/243
£88/171
7/12
6011 IS “)
— 35/55
— 13/0
F 341 52
W /*9— 66
8 /Sz n
P 216 / 215
59/88
851 / €1 1 ")
1291/9£>I
— 190 / 285
129/ 104
1456/ 1814
1109/ 1283
Of/8I
40/ 33
—89/ 57 Lo/o
4 0/0
po/o
4 LEI /56

L CH /SL
168/84 )
€ /9
157/35
— SCI /►SI
987 /1500
254/ 253
91 /Qt^
4 15/4
11 /0l "I
— 101 /6H
30/34
206/ 207
52/4729/3942 / 40 “I
— 240 / 196• 1002 / 967
C 116/ 178
38/70
6/12
99/188
283 / 215 “I
1523 /1758
310/434
U 0/0
1504/ 1828 -♦
(9/13
1891/2147
18/15)
p209/ 187
846/915
L 211 / 139
134 / 73
0/0 m)
►Z/Z8•
— 16/ 19
• 181 /78
268 / 459 1
704 / 1153 m)
( 356 / 203
78/47
Sil /OOI "I
53 / 65 m)70 / 46 ")
89/ 170
— 211 I9L
1974 / 2149 m)
235 / 213275 / 446
1034/ 1499
200/260
163/255 “)
708 /1103
529 / 732
222/ 240233 / 408
151/61
45/4153 /35 m)
1 SSf IZLZ
SWC Rosedale and Coffee, Bakersfield
Buildout Year 2046 With Project Phases I-II Peak Hour Volumes Figure 6-2b
Way Stop
h
o
—
L 351/407
- 526/678
C 199'305
169/327
327 / 535
63/ 154 )
23 24 Calloway Dr & Noriega Road
Coffee Rd/Gosford Rd & Stockdale
Hwy
L 173 / 506
— 0/0
C 450 / 921
L 94/175
- 0/0
C 6/ 12
27 El Toro Viejo Rd & Project
Driveway A
Signalized
21 Cofoo Ko & rutun Avo
Coffee Rd & Westside Pkwy EB
Ramps
U 0/0
- 0/0
( 0/0
0/0
1348/ 1399 "
21 / 36 ")
207/146
0/0
272/176
30 31 32 Coffee Rd & Project Dwy F Coffee Rd & Project Dwy H JJIL
& Rosedale Hwy (CA-O
o
O
o
Project Dwy E & Rosedale Hwy (CA-58)
L 0/0
- 957/1652
C 0/0
L 0/0
— 957/ 1634
C 0/0
26 L
Calloway Dr & Meacham Rd
L 72/50
— 37/125
C 90/91
Signalized
One-Way Stop
0/0 -
1460 / 1472 •
29/48 ")
58/39 J
89/78 •
188 / 209
28 Project Dwy B
58)
0/0
0/0 17
0/0 1
25 Calloway Dr &
368 / 333
0/0
248 / 205 1
■
Signalized
Hageman Rd
L 227 / 417
— 472/1007
C 242 / 270
150/ 173 -
959 / 642 •
169/ 164 “I
29 JIL
o
D
o
D
o
Project Dwy C
58)
0/0 •
1450/ 1477 -
28/48 n
t r
a
& Rosedale Hwy (CA-D
o
D
o
L 0/0
— 9101 1657
C 0/0
Signalized Signalized
XX/XX AM / PM Peak Hour Volumes
I

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
One-Way Stop
Signalized One-Way Stop Lo/o + 1955 / 2271 f 0/0 0/0 "1 21 16 / 2407 C 0/0 £0/01933 / 2212 o
t 36/60
P
s
P 279/346
987/1788
— 464/337
163/215 ->
1641/1203
8SI /
+O+/049 •
H8I / 9051
Lo/o
0/0 "
2325 / 2707 •)
P 109/ 175
691/vL
L0/0
9vL I / E6Z 1
6L / soz
0/0
0/0
1919/2130
J
— 739 / 816
— 8S/80
0/0 •0/0
118/ 106
0/0 J
as
U 56/63
4 II 25 / 11 79
— 16/H
710/ 1340
101 / 183
0/0 •
P 522/ 310
U 0/0#0/0
799/850
£Z1/66")
0/0
700/ 1284
1 17/232
0/0 “I
I >11/956 I
0/0
• 1150 / 1161
C0/0
LI /911
24 / 48
0/00/0 502/956
215/243 ")
78/ 179
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Recommended Improvements
55 7.0 RECOMMENDED IMPROVEMENTS
This section summarizes the recommended improvements at deficient locations under all analyzed scenarios discussed in this report.

New development projects within the City of Bakersfield are required to provide needed infrastructure improvements to meet the demand created by the development and provide off-site improvements designed to ensure construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements, and the project will pay its fair share contribution towards the cost of these improvements.

Table 7-1 show recommended transportation improvements needed to address future growth and cumulative traffic intersection and roadway segment deficiencies within the City of Bakersfield. This table also highlights which improvements are included in the RTIF and which improvements would be local improvements.

Additionally, the Project will be conditioned to fully construct the following project features at the main access points to the development:
• Addition of a fourth (south) approach at existing signalized intersection of Rosedale Highway (CA-58) and Northwest Promenade including the construction of a westbound dual left turn pocket with 250-foot lanes to match the existing eastbound dual left turn pocket. • Addition of a fourth (west) approach at existing signalized intersection of Coffee Road and Jet Way including the construction of a northbound dual left turn pocket with 250-foot lanes.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Recommended Improvements
56 Table 7-1
Recommended Improvements
Improvement
Recommended Improvements
Improvement Funding
Year 2027 with Project Year 2028 with Project Buildout Year 2046 With Project Coffee Road and Project Driveway F
Installation of traffic signals at these intersections will improve the operations. However, a traffic signal is not warranted at either location. Therefore, no
improvements are recommended.

N/A
Coffee Road and Project Driveway H N/A
Coffee Road between Rosedale Highway (CA-58) and Jet
Way
These roadway segments are at their buildout
classification per the Metropolitan Bakersfield General Plan and no improvements are identified in the
Bakersfield RTIF. Therefore, no improvements are
recommended. However, the project will construct
exclusive southbound right turn lanes along the Coffee
Road frontage that will maintain capacity for
southbound through movements.

These roadway segments are at their buildout
classification per the Metropolitan Bakersfield General Plan and no improvements are identified in the
Bakersfield RTIF. Therefore, no improvements are
recommended. However, the project will construct
exclusive southbound right turn lanes along the Coffee
Road frontage that will maintain capacity for
southbound through movements.

Project
Coffee Road between Jet Way and Brimhall Road
Coffee Road between Westside Parkway EB Ramps and
Truxton Road
N/A
Coffee Road between Truxton Road and Stockdale
Highway
These roadway segments are at their buildout
classification per the Metropolitan Bakersfield General Plan and no improvements are identified in the
Bakersfield RTIF. Therefore, no improvements are
recommended.

N/A
Calloway Drive between Rosedale Highway (CA-58) and
Brimhall Road Roadway widening to 6 lanes Roadway widening to 6 lanes Roadway widening to 6 lanes RTIF Project B62

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Riverview Market, City of Bakersfield, CA
Transportation Analysis (TA) Vehicle Miles Traveled
57 8.0 VEHICLE MILES TRAVELED
The purpose of this section is to evaluate the project’s vehicle miles traveled (VMT) analysis requirements and compliance with Senate Bill 743 (SB 743) and the California Environmental Quality Act (CEQA).

SB 743
On September 27, 2013, Senate Bill (SB) 743 was signed into State law and started a process intended to fundamentally change transportation impact analysis as part of the California Environmental Quality Act (CEQA) compliance. The California Natural Resource Agency updated the CEQA transportation analysis guidelines in 2018. In this update automobile delay and level of service (LOS) metrics are no longer to be used in determining transportation impacts. After July 1, 2020, transportation analysis under CEQA must use VMT to determine impacts for land use projects.

VMT ANALYSIS GUIDELINES
The project is within the jurisdiction of the City of Bakersfield (City). The City currently does not have guidance on evaluating VMT for transportation impacts under CEQA. In absence of direct guidance from the lead agency, this VMT analysis was prepared consistent with requirements of Senate Bill 743 (SB 743), the Office of Planning and Research’s (OPR’s) Technical Advisory and with the Fresno County SB 743 Implementation Regional Guidelines.

VMT ANALYSIS
A VMT analysis was prepared for this project and provided by separate document included in Appendix L.

INTEGRATED ENGINEERING GROUP

TRANSPORTATION PLANNING AND ENGINEERING
Appendix A. Volume Development
Traffic Counts
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 1
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0 0 0 0 0
7:00 AM 1 0 3 6 0 5 10 181 2 0 118 7 333 0 0 1 3 4
7:15 AM 4 1 2 5 2 5 7 206 4 0 102 5 343 0 0 0 1 1
7:30 AM 0 0 0 9 3 6 6 272 2 0 159 6 463 0 0 0 6 6
7:45 AM 2 1 0 4 1 3 10 253 3 1 201 14 493 0 0 1 2 3
8:00 AM 1 1 0 5 0 9 8 280 7 1 171 9 492 0 0 2 1 3
8:15 AM 2 1 0 5 4 5 7 236 8 0 173 3 444 0 0 2 3 5
8:30 AM 1 0 3 4 0 7 2 215 3 0 167 4 406 0 0 3 1 4
8:45 AM 5 2 0 8 2 9 8 216 1 0 177 2 430 0 0 3 2 5
VOLUMES 16 6 8 46 12 49 58 1,859 30 2 1,268 50 3,435 0 0 12 19 31 APPROACH % 53% 20% 27% 43% 11% 46% 3% 95% 2% 0% 95% 4%
APP/DEPART 30 / 114 107 / 44 1,959 / 1,932 1,339 / 1,345 0

BEGIN PEAK HR
VOLUMES 5 3 0 23 8 23 31 1,041 20 2 704 32 1,909 0 0 5 12 APPROACH % 63% 38% 0% 43% 15% 43% 3% 95% 2% 0% 94% 4%
PEAK HR FACTOR 0.667 0.750 0.923 0.860 0.962
APP/DEPART 8 / 66 54 / 30 1,097 / 1,076 750 / 737 0
4:00 PM 6 0 5 15 1 7 4 287 2 1 334 7 669 0 0 6 0 6
4:15 PM 3 1 0 5 0 7 3 236 0 0 329 3 587 0 0 2 0 2
4:30 PM 2 0 1 10 0 7 5 231 1 1 332 2 592 0 0 2 1 3
4:45 PM 4 2 1 9 0 8 3 228 2 0 379 9 645 0 0 4 0 4
5:00 PM 3 0 0 18 0 18 4 235 1 1 307 5 592 0 0 5 1 6
5:15 PM 0 0 0 5 0 10 7 244 0 0 426 4 696 0 0 3 0 3
5:30 PM 0 0 1 5 0 5 2 244 0 0 308 3 568 0 0 2 1 3
5:45 PM 3 4 1 1 0 9 3 230 0 0 268 5 524 0 0 2 0 2
VOLUMES 21 7 9 68 1 71 31 1,935 6 3 2,683 38 4,902 0 0 26 3 29 APPROACH % 57% 19% 24% 49% 1% 51% 2% 97% 0% 0% 98% 1%
APP/DEPART 37 / 76 140 / 10 1,998 / 2,015 2,727 / 2,801 0

BEGIN PEAK HR
VOLUMES 9 2 2 42 0 43 19 938 4 2 1,444 20 2,541 0 0 14 2 APPROACH % 69% 15% 15% 49% 0% 51% 2% 96% 0% 0% 98% 1%
PEAK HR FACTOR 0.464 0.590 0.960 0.853 0.909
APP/DEPART 13 / 41 85 / 6 975 / 984 1,468 / 1,510 0
Patton Way

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Patton Way

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 1 2 0 0 3 1 2 0 0 3 0 0 0 0 0
8:15 AM 1 2 0 0 3 1 0 0 0 1 0 2 0 0 2
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 2 4 0 0 6 2 2 0 0 4 0 2 0 0 2
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 2 0 1 3 0 1 0 1 2 0 1 0 0 1
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
5:00 PM 1 1 0 1 3 0 0 0 0 0 1 1 0 1 3
5:15 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1
5:30 PM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
5:45 PM 0 1 0 1 2 0 1 0 1 2 0 0 0 0 0
TOTAL 2 6 0 3 11 1 3 0 2 6 1 3 0 1 5

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Patton Way
Rosedale Hwy

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:30 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS
[ ]
[ ]
247 120 13 114 TOTAL 190
140 71 1 68 PM 76
107 49 12 46 AM 114 1,339 2,727 4,066 4,146 2,801 1,345 50 38 88 1,268 2,683 3,951 TOTAL PMAM2 3 5 89 31 58 AMPM TOTAL 3,794 1,935 1,859 36 6 30 1,932 2,015 3,947 3,957 1,998 1,959 44 AM 16 6 8 30
10 PM 21 7 9 37
54 TOTAL 37 13 17 67
139 66 8 65 TOTAL 107
85 43 0 42 PM 41
54 23 8 23 AM 66 750 1,468 2,218 2,247 1,510 737 32 20 52 704 1,444 2,148 TOTAL PMAMAM 7:30 AM 8:45 AM 2 2 4 50 19 31
#N/A AMPM TOTAL 1,979 938 1,041 PM 4:30 PM
3:45 PM 24 4 20 1,076 984 2,060 2,072 975 1,097
30 AM 5 3 0 8
6 PM 9 2 2 13
36 Total 14 5 2 21
Patton Way
AimTD LLC

TURNING MOVEMENT COUNTS
Patton Way Rosedale HwyRosedale Hwy ALL HOURS
Patton Way
Patton Way Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC5147
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 2 0 6 8 0 9 11 203 2 0 142 12 392 0
7:15 AM 8 2 3 6 2 8 9 221 4 0 120 7 389 0
7:30 AM 0 0 0 16 3 10 6 300 4 0 186 7 531 0
7:45 AM 2 2 0 4 1 4 11 273 3 1 223 18 540 0
8:00 AM 1 2 0 6 0 11 9 305 9 1 208 11 561 0
8:15 AM 2 1 0 7 8 5 8 265 12 0 196 4 506 0
8:30 AM 2 0 3 7 0 10 2 244 3 0 193 5 467 0
8:45 AM 6 3 0 8 3 15 11 239 1 0 197 4 485 0
VOLUMES 22 9 12 61 17 71 65 2,048 38 2 1,462 65 3,869 0 0 0 0 0 APPROACH % 52% 20% 28% 41% 11% 48% 3% 95% 2% 0% 96% 4%
APP/DEPART 42 / 139 148 / 57 2,151 / 2,120 1,529 / 1,554 0

BEGIN PEAK HR
VOLUMES 5 4 0 33 12 30 33 1,142 28 2 811 38 2,137
APPROACH % 56% 44% 0% 44% 16% 40% 3% 95% 2% 0% 95% 4%
PEAK HR FACTOR 0.643 0.654 0.932 0.883 0.952
APP/DEPART 9 / 75 75 / 42 1,203 / 1,175 851 / 846 0
4:00 PM 6 0 5 18 1 9 5 303 2 1 349 9 707 0
4:15 PM 3 1 0 6 0 7 3 249 0 0 340 3 612 0
4:30 PM 2 0 1 13 0 7 8 248 2 2 348 2 632 0
4:45 PM 4 2 1 10 0 9 4 245 3 0 395 12 685 0
5:00 PM 3 0 0 20 0 20 5 246 1 1 319 5 620 0
5:15 PM 0 0 0 8 0 11 7 256 0 0 432 5 718 0
5:30 PM 0 0 1 5 0 6 2 258 0 0 315 5 591 0
5:45 PM 3 4 1 1 0 9 3 240 0 0 280 6 546 0
VOLUMES 21 7 9 79 1 78 36 2,042 8 4 2,778 47 5,109 0 0 0 0 0 APPROACH % 57% 19% 24% 50% 1% 49% 2% 98% 0% 0% 98% 2%
APP/DEPART 37 / 90 158 / 13 2,086 / 2,130 2,828 / 2,876 0

BEGIN PEAK HR
VOLUMES 9 2 2 50 0 47 24 993 6 3 1,494 24 2,653
APPROACH % 69% 15% 15% 52% 0% 48% 2% 97% 1% 0% 98% 2%
PEAK HR FACTOR 0.464 0.606 0.974 0.871 0.924
APP/DEPART 13 / 49 97 / 9 1,023 / 1,045 1,521 / 1,550 0 Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 0 0 0 3 0 2 9 161 2 0 91 3 271 0 0 1 2 3
7:15 AM 0 0 1 4 2 2 3 186 4 0 86 2 290 0 0 0 1 1
7:30 AM 0 0 0 2 3 3 6 239 1 0 128 5 387 0 0 0 6 6
7:45 AM 2 0 0 4 1 2 9 227 3 1 176 10 435 0 0 1 1 2
8:00 AM 1 0 0 4 0 6 6 254 4 1 130 6 412 0 0 2 0 2
8:15 AM 2 1 0 1 0 5 6 204 4 0 147 2 372 0 0 2 2 4
8:30 AM 0 0 3 2 0 2 2 183 3 0 138 3 336 0 0 2 1 3
8:45 AM 4 1 0 8 1 4 6 190 1 0 145 1 361 0 0 2 2 4
VOLUMES 9 2 4 28 7 26 47 1,644 22 2 1,041 32 2,889 0 0 10 15 25 APPROACH % 60% 13% 27% 46% 11% 43% 3% 95% 1% 0% 96% 3%
APP/DEPART 15 / 81 61 / 31 1,723 / 1,691 1,090 / 1,086 0

BEGIN PEAK HR
VOLUMES 5 1 0 11 4 16 27 924 12 2 581 23 1,620 0 0 5 9
APPROACH % 83% 17% 0% 35% 13% 52% 3% 95% 1% 0% 94% 4%
PEAK HR FACTOR 0.500 0.775 0.910 0.818 0.927
APP/DEPART 6 / 51 31 / 18 968 / 944 615 / 607 0
4:00 PM 6 0 5 13 1 6 3 267 2 1 314 6 624 0 0 6 0 6
4:15 PM 3 1 0 4 0 7 3 221 0 0 311 3 553 0 0 2 0 2
4:30 PM 2 0 1 6 0 7 3 211 0 0 308 2 540 0 0 1 1 2
4:45 PM 4 2 1 7 0 6 2 212 0 0 358 6 598 0 0 2 0 2
5:00 PM 3 0 0 17 0 17 2 221 1 1 292 5 559 0 0 5 1 6
5:15 PM 0 0 0 3 0 8 7 233 0 0 417 3 671 0 0 3 0 3
5:30 PM 0 0 1 5 0 4 2 232 0 0 297 2 543 0 0 2 1 3
5:45 PM 3 4 1 1 0 9 3 219 0 0 256 4 500 0 0 2 0 2
VOLUMES 21 7 9 56 1 64 25 1,816 3 2 2,553 31 4,614 0 0 23 3 26 APPROACH % 57% 19% 24% 46% 1% 53% 1% 97% 0% 0% 99% 1%
APP/DEPART 37 / 63 121 / 6 1,867 / 1,884 2,589 / 2,661 0

BEGIN PEAK HR
VOLUMES 9 2 2 33 0 38 14 877 1 1 1,375 16 2,381 0 0 11 2 APPROACH % 69% 15% 15% 46% 0% 54% 2% 97% 0% 0% 99% 1%
PEAK HR FACTOR 0.464 0.522 0.929 0.830 0.883
APP/DEPART 13 / 32 71 / 2 903 / 914 1,394 / 1,433 0
Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 1 0 0 3 0 1 1 11 0 0 17 1 35 0 0 0 1 1
7:15 AM 0 0 1 1 0 2 4 16 0 0 8 3 35 0 0 0 0 0
7:30 AM 0 0 0 4 0 1 0 24 0 0 19 1 49 0 0 0 0 0
7:45 AM 0 1 0 0 0 0 1 16 0 0 15 3 36 0 0 0 1 1
8:00 AM 0 1 0 0 0 2 2 17 2 0 27 3 54 0 0 0 1 1
8:15 AM 0 0 0 4 0 0 1 19 1 0 15 1 41 0 0 0 1 1
8:30 AM 1 0 0 1 0 4 0 21 0 0 19 0 46 0 0 1 0 1
8:45 AM 1 1 0 0 0 3 1 16 0 0 27 0 49 0 0 1 0 1
VOLUMES 3 3 1 13 0 13 10 140 3 0 147 12 351 0 0 2 4 6
APPROACH % 43% 43% 14% 50% 0% 50% 6% 90% 2% 0% 90% 7%
APP/DEPART 7 / 25 26 / 3 155 / 158 163 / 165 0

BEGIN PEAK HR
VOLUMES 0 2 0 8 0 3 4 76 3 0 76 8 183 0 0 0 3
APPROACH % 0% 100% 0% 73% 0% 27% 5% 92% 4% 0% 87% 9%
PEAK HR FACTOR 0.500 0.550 0.865 0.702 0.832
APP/DEPART 2 / 14 11 / 3 83 / 87 87 / 79 0
4:00 PM 0 0 0 1 0 0 1 14 0 0 16 0 32 0 0 0 0 0
4:15 PM 0 0 0 1 0 0 0 10 0 0 14 0 25 0 0 0 0 0
4:30 PM 0 0 0 3 0 0 1 15 0 0 18 0 37 0 0 0 0 0
4:45 PM 0 0 0 2 0 2 0 9 2 0 16 2 33 0 0 2 0 2
5:00 PM 0 0 0 0 0 0 2 9 0 0 12 0 23 0 0 0 0 0
5:15 PM 0 0 0 1 0 2 0 5 0 0 6 1 15 0 0 0 0 0
5:30 PM 0 0 0 0 0 1 0 5 0 0 10 0 16 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 7 0 0 7 0 14 0 0 0 0 0
VOLUMES 0 0 0 8 0 5 4 74 2 0 99 3 197 0 0 2 0 2
APPROACH % 0% 0% 0% 62% 0% 38% 5% 90% 2% 0% 97% 3%
APP/DEPART 0 / 7 13 / 2 82 / 82 102 / 106 0

BEGIN PEAK HR
VOLUMES 0 0 0 6 0 4 3 38 2 0 52 3 110 0 0 2 0
APPROACH % 0% 0% 0% 60% 0% 40% 7% 84% 4% 0% 95% 5%
PEAK HR FACTOR 0.000 0.625 0.703 0.764 0.743
APP/DEPART 0 / 6 10 / 2 45 / 44 55 / 58 0
Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 0 0 1 0 0 1 0 2 0 0 4 2 10 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
7:30 AM 0 0 0 1 0 1 0 1 0 0 3 0 6 0 0 0 0 0
7:45 AM 0 0 0 0 0 1 0 4 0 0 3 0 8 0 0 0 0 0
8:00 AM 0 0 0 1 0 1 0 1 0 0 4 0 7 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 1 0 0 4 0 5 0 0 0 0 0
8:30 AM 0 0 0 0 0 1 0 2 0 0 3 0 6 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 2 0 0 3 0 5 0 0 0 0 0
VOLUMES 0 0 1 2 0 5 0 13 0 0 25 2 48 0 0 0 0 0
APPROACH % 0% 0% 100% 29% 0% 71% 0% 100% 0% 0% 93% 7%
APP/DEPART 1 / 2 7 / 0 13 / 16 27 / 30 0

BEGIN PEAK HR
VOLUMES 0 0 0 2 0 3 0 7 0 0 14 0 26 0 0 0 0
APPROACH % 0% 0% 0% 40% 0% 60% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.625 0.438 0.875 0.813
APP/DEPART 0 / 0 5 / 0 7 / 9 14 / 17 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 2 0 0 3 0 5 0 0 0 0 0
4:30 PM 0 0 0 1 0 0 0 0 0 0 4 0 5 0 0 1 0 1
4:45 PM 0 0 0 0 0 0 1 1 0 0 2 0 4 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 3 0 0 0 0 3 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 2 0 0 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 1 0 0 2 1 4 0 0 0 0 0
VOLUMES 0 0 0 1 0 0 1 11 0 0 13 1 28 0 0 1 0 1
APPROACH % 0% 0% 0% 100% 0% 0% 8% 85% 0% 0% 93% 7%
APP/DEPART 0 / 2 1 / 0 13 / 12 14 / 14 0

BEGIN PEAK HR
VOLUMES 0 0 0 1 0 0 1 6 0 0 7 0 16 0 0 1 0
APPROACH % 0% 0% 0% 100% 0% 0% 13% 75% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.250 0.667 0.438 0.667
APP/DEPART 0 / 1 1 / 0 8 / 7 7 / 8 0
Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 0 0 0 0 0 1 0 7 0 0 5 1 14 0 0 0 0 0
7:15 AM 0 0 0 0 0 1 0 3 0 0 6 0 10 0 0 0 0 0
7:30 AM 0 0 0 2 0 1 0 7 1 0 5 0 16 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 2 0 0 4 1 7 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 7 0 0 9 0 16 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 6 0 0 4 0 10 0 0 0 0 0
8:30 AM 0 0 0 1 0 0 0 7 0 0 6 0 14 0 0 0 0 0
8:45 AM 0 0 0 0 0 2 1 5 0 0 1 1 10 0 0 0 0 0
VOLUMES 0 0 0 3 0 5 1 44 1 0 40 3 97 0 0 0 0 0
APPROACH % 0% 0% 0% 38% 0% 63% 2% 96% 2% 0% 93% 7%
APP/DEPART 0 / 4 8 / 1 46 / 47 43 / 45 0

BEGIN PEAK HR
VOLUMES 0 0 0 2 0 1 0 22 1 0 22 1 49 0 0 0 0
APPROACH % 0% 0% 0% 67% 0% 33% 0% 96% 4% 0% 96% 4%
PEAK HR FACTOR 0.000 0.250 0.719 0.639 0.766
APP/DEPART 0 / 1 3 / 1 23 / 24 23 / 23 0
4:00 PM 0 0 0 1 0 1 0 3 0 0 3 1 9 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 3 0 0 0 0 3 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 1 4 0 0 1 0 6 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 5 0 0 3 1 9 0 0 0 0 0
5:00 PM 0 0 0 1 0 1 0 1 0 0 3 0 6 0 0 0 0 0
5:15 PM 0 0 0 1 0 0 0 3 0 0 0 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 4 0 0 1 1 6 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 2 0 0 3 0 5 0 0 0 0 0
VOLUMES 0 0 0 3 0 2 1 25 0 0 14 3 48 0 0 0 0 0
APPROACH % 0% 0% 0% 60% 0% 40% 4% 96% 0% 0% 82% 18%
APP/DEPART 0 / 4 5 / 0 26 / 28 17 / 16 0

BEGIN PEAK HR
VOLUMES 0 0 0 2 0 1 1 13 0 0 7 1 25 0 0 0 0
APPROACH % 0% 0% 0% 67% 0% 33% 7% 93% 0% 0% 88% 13%
PEAK HR FACTOR 0.000 0.375 0.700 0.500 0.694
APP/DEPART 0 / 2 3 / 0 14 / 15 8 / 8 0
Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 1 / 1 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 1 / 1 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.250 0.000 0.250
APP/DEPART 0 / 0 0 / 0 1 / 1 0 / 0 0
Patton Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Patton Way LOCATION #: 1
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 1 0 0 1 0 1 3 0 1 3 0
7:00 AM 0 0 2 0 0 0 0 0 0 0 1 0 3 0 0 0 0 0
7:15 AM 4 1 0 0 0 0 0 1 0 0 1 0 7 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 1 0 0 4 0 5 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 4 0 0 3 0 7 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 1 1 0 1 0 3 0 0 0 0 0
8:15 AM 0 0 0 0 4 0 0 6 3 0 3 0 16 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 2 0 0 0 1 3 0 0 0 0 0
8:45 AM 0 0 0 0 1 0 0 3 0 0 1 0 5 0 0 0 0 0
VOLUMES 4 1 2 0 5 0 0 18 4 0 14 1 49 0 0 0 0 0
APPROACH % 57% 14% 29% 0% 100% 0% 0% 82% 18% 0% 93% 7%
APP/DEPART 7 / 2 5 / 9 22 / 20 15 / 18 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 4 0 0 12 4 0 11 0 31 0 0 0 0
APPROACH % 0% 0% 0% 0% 100% 0% 0% 75% 25% 0% 100% 0%
PEAK HR FACTOR 0.000 0.250 0.444 0.688 0.484
APP/DEPART 0 / 0 4 / 8 16 / 12 11 / 11 0
4:00 PM 0 0 0 0 0 0 0 3 0 0 0 0 3 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 1 1 1 1 0 4 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 8 1 1 4 0 14 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 89% 11% 20% 80% 0%
APP/DEPART 0 / 0 0 / 2 9 / 8 5 / 4 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 3 1 1 3 0 8 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 75% 25% 25% 75% 0%
PEAK HR FACTOR 0.000 0.000 0.500 0.500 0.500
APP/DEPART 0 / 0 0 / 2 4 / 3 4 / 3 0
Patton Way

NORTH SIDE
WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Patton Way
Rosedale Hwy

U-TURNS
Patton Way Patton Way Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
T020624
DATE: LOCATION: PROJECT #: SC4983
Thu, Oct 24, 24 NORTH & SOUTH: LOCATION #: 2
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1 0 0 0 0
7:00 AM 41 133 31 27 169 10 20 131 59 28 73 10 732 0 0 0 0 0 7:15 AM 45 210 37 39 200 13 18 151 86 33 96 16 944 0 0 0 1 1 7:30 AM 51 208 53 42 234 20 21 173 79 19 97 26 1,023 0 0 0 0 0 7:45 AM 67 344 72 44 312 26 56 196 117 29 138 25 1,426 1 1 1 0 3 8:00 AM 70 335 56 30 237 26 35 167 98 28 117 44 1,243 0 1 1 0 2 8:15 AM 68 261 54 45 245 37 38 162 69 32 124 29 1,164 0 0 0 0 0 8:30 AM 60 224 45 53 228 24 29 125 72 29 135 38 1,062 0 0 2 0 2 8:45 AM 67 208 47 29 162 28 33 156 85 28 115 39 997 0 1 2 1 4 VOLUMES 469 1,923 395 309 1,787 184 250 1,261 665 226 895 227 8,603 1 3 6 2 12 APPROACH % 17% 69% 14% 14% 78% 8% 11% 58% 30% 17% 66% 17% APP/DEPART 2,788 / 2,403 2,283 / 2,679 2,182 / 1,967 1,350 / 1,554 0

BEGIN PEAK HR
VOLUMES 265 1,164 227 172 1,022 113 158 650 356 118 514 136 4,902 1 2 4 0 APPROACH % 16% 70% 14% 13% 78% 9% 14% 56% 30% 15% 67% 18% PEAK HR FACTOR 0.856 0.854 0.789 0.950 0.858
APP/DEPART 1,657 / 1,460 1,309 / 1,497 1,168 / 1,049 768 / 896 0 4:00 PM 119 318 52 58 262 37 41 179 103 66 236 77 1,548 0 0 1 0 1 4:15 PM 107 359 49 44 284 46 34 132 85 65 186 52 1,443 0 4 1 1 6 4:30 PM 109 266 40 63 259 32 42 160 103 56 244 69 1,443 0 2 0 0 2 4:45 PM 97 365 47 57 294 38 52 143 83 63 228 70 1,537 0 3 0 0 3 5:00 PM 89 302 42 68 251 41 42 174 105 59 247 51 1,471 0 1 1 0 2 5:15 PM 95 365 51 60 274 55 49 135 65 53 222 67 1,491 0 1 2 0 3 5:30 PM 108 326 43 56 267 34 41 189 100 51 221 49 1,485 0 0 1 0 1 5:45 PM 90 290 35 44 243 41 49 143 73 41 177 53 1,279 0 1 2 2 5 VOLUMES 814 2,591 359 450 2,134 324 350 1,255 717 454 1,761 488 11,720 0 12 8 3 23 APPROACH % 22% 69% 10% 15% 73% 11% 15% 54% 31% 17% 65% 18% APP/DEPART 3,764 / 3,441 2,920 / 3,305 2,330 / 2,067 2,706 / 2,907 0

BEGIN PEAK HR
VOLUMES 389 1,358 183 241 1,086 168 184 641 353 226 918 237 5,993 0 5 4 0 APPROACH % 20% 70% 9% 16% 72% 11% 16% 54% 30% 16% 66% 17% PEAK HR FACTOR 0.944 0.957 0.893 0.956 0.973
APP/DEPART 1,930 / 1,784 1,500 / 1,665 1,182 / 1,065 1,381 / 1,479 0 Coffee Rd

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Coffee Rd

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 3 0 0 0 3 1 0 0 0 1 2 0 0 0 2
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 1 0 1 0 0 1 0 1 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 1 0 0 0 1 0 0 0 0 0 1 0 0 0 1
8:15 AM 0 1 1 0 2 0 0 1 0 1 0 1 0 0 1
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
TOTAL 4 2 2 0 8 1 1 2 0 4 3 1 0 0 4
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 1 0 1 2 0 0 0 0 0 0 1 0 1 2
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 2 1 0 0 3 0 0 0 0 0 2 1 0 0 3
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 1 0 1 1 3 0 0 0 0 0 1 0 1 1 3
5:45 PM 1 0 1 1 3 0 0 0 0 0 1 0 1 1 3
TOTAL 4 2 2 3 11 0 0 0 0 0 4 2 2 3 11

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:45 AM PM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Coffee Rd
Rosedale Hwy

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
[ ]
[ ]
5,203 508 3,921 759 TOTAL 5,844
2,920 324 2,134 450 PM 3,441
2,283 184 1,787 309 AM 2,403 1,350 2,706 4,056 4,461 2,907 1,554 227 488 715 895 1,761 2,656 TOTAL PMAM226 454 680 600 350 250 AMPM TOTAL 2,516 1,255 1,261 1,382 717 665 1,967 2,067 4,034 4,512 2,330 2,182 2,679 AM 469 1,923 395 2,788
3,305 PM 814 2,591 359 3,764
5,984 TOTAL 1,283 4,514 754 6,552
2,809 281 2,108 413 TOTAL 3,244
1,500 168 1,086 241 PM 1,784
1,309 113 1,022 172 AM 1,460 768 1,381 2,149 2,375 1,479 896 136 237 373 514 918 1,432 TOTAL PMAMAM 7:45 AM 8:45 AM 118 226 344 342 184 158
#N/A AMPM TOTAL 1,291 641 650 PM 4:45 PM
3:45 PM 709 353 356 1,049 1,065 2,114 2,350 1,182 1,168 1,497 AM 265 1,164 227 1,657
1,665 PM 389 1,358 183 1,930
3,162 Total 654 2,522 410 3,587
Coffee Rd
AimTD LLC

TURNING MOVEMENT COUNTS
Coffee Rd Rosedale HwyRosedale Hwy ALL HOURS
Coffee Rd
Coffee Rd Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC4983
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 43 142 33 30 191 14 21 144 63 40 97 12 827 0
7:15 AM 50 219 41 42 212 15 21 165 95 46 118 24 1,045 0 7:30 AM 54 217 56 43 246 26 22 193 86 23 121 29 1,114 0 7:45 AM 72 354 78 48 322 33 62 207 124 33 161 31 1,523 0 8:00 AM 74 347 64 35 246 31 40 180 106 31 140 49 1,340 0 8:15 AM 76 286 64 49 255 40 41 173 76 42 158 31 1,288 0 8:30 AM 65 237 50 56 239 25 33 140 79 31 157 41 1,150 0 8:45 AM 71 219 53 31 173 32 37 170 91 32 132 42 1,080 0 VOLUMES 503 2,018 437 332 1,882 214 277 1,372 719 277 1,081 257 9,365 0 0 0 0 0 APPROACH % 17% 68% 15% 14% 78% 9% 12% 58% 30% 17% 67% 16% APP/DEPART 2,957 / 2,551 2,428 / 2,877 2,367 / 2,140 1,614 / 1,797 0

BEGIN PEAK HR
VOLUMES 286 1,223 255 187 1,062 128 176 700 384 137 614 151 5,300 APPROACH % 16% 69% 14% 14% 77% 9% 14% 56% 30% 15% 68% 17% PEAK HR FACTOR 0.876 0.854 0.801 0.980 0.870
APP/DEPART 1,763 / 1,549 1,376 / 1,583 1,260 / 1,141 902 / 1,028 0 4:00 PM 122 335 57 61 270 39 42 188 108 72 249 81 1,622 0 4:15 PM 110 377 54 44 289 48 34 139 88 68 196 53 1,497 0 4:30 PM 114 275 42 65 270 33 44 172 108 60 253 70 1,502 0 4:45 PM 98 372 48 58 303 41 54 155 84 68 244 73 1,596 0 5:00 PM 94 311 47 71 253 42 43 188 107 66 251 52 1,522 0 5:15 PM 98 369 52 61 276 57 50 142 69 54 227 68 1,521 0 5:30 PM 111 333 49 58 271 34 42 197 104 54 228 49 1,527 0 5:45 PM 91 298 38 44 248 42 49 149 75 41 183 54 1,311 0 VOLUMES 836 2,668 386 461 2,178 335 356 1,328 741 481 1,830 498 12,096 0 0 0 0 0 APPROACH % 21% 69% 10% 16% 73% 11% 15% 55% 31% 17% 65% 18% APP/DEPART 3,890 / 3,522 2,974 / 3,399 2,425 / 2,175 2,808 / 3,001 0

BEGIN PEAK HR
VOLUMES 400 1,384 195 248 1,102 174 188 681 363 241 949 242 6,165 APPROACH % 20% 70% 10% 16% 72% 11% 15% 55% 29% 17% 66% 17% PEAK HR FACTOR 0.953 0.948 0.901 0.932 0.966
APP/DEPART 1,979 / 1,814 1,523 / 1,706 1,232 / 1,123 1,432 / 1,523 0 Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 38 124 28 24 154 7 19 116 53 14 46 6 629 0 0 0 0 0 7:15 AM 40 200 29 34 189 10 15 136 76 17 69 9 824 0 0 0 1 1 7:30 AM 46 195 49 41 218 13 19 154 71 13 73 22 914 0 0 0 0 0 7:45 AM 62 332 67 40 299 19 50 180 110 23 111 19 1,312 1 1 1 0 3 8:00 AM 63 320 46 27 226 20 31 153 89 26 92 39 1,132 0 1 1 0 2 8:15 AM 58 232 45 39 232 33 33 146 62 22 93 26 1,021 0 0 0 0 0 8:30 AM 54 210 40 49 213 23 25 111 65 26 109 35 960 0 0 2 0 2 8:45 AM 63 196 42 26 149 24 28 138 77 24 92 36 895 0 1 2 1 4 VOLUMES 424 1,809 346 280 1,680 149 220 1,134 603 165 685 192 7,699 1 3 6 2 12 APPROACH % 16% 70% 13% 13% 80% 7% 11% 58% 31% 16% 66% 18% APP/DEPART 2,580 / 2,224 2,112 / 2,449 1,963 / 1,762 1,044 / 1,264 0

BEGIN PEAK HR
VOLUMES 237 1,094 198 155 970 95 139 590 326 97 405 119 4,432 1 2 4 0 APPROACH % 15% 72% 13% 13% 79% 8% 13% 56% 31% 16% 65% 19% PEAK HR FACTOR 0.828 0.851 0.776 0.913 0.843
APP/DEPART 1,530 / 1,354 1,222 / 1,394 1,059 / 943 621 / 741 0 4:00 PM 115 298 47 55 253 36 40 168 99 61 218 72 1,462 0 0 1 0 1 4:15 PM 103 340 43 44 278 44 34 121 83 61 172 51 1,374 0 4 1 1 6 4:30 PM 104 257 37 61 250 31 40 149 98 53 233 68 1,381 0 2 0 0 2 4:45 PM 95 351 46 56 285 35 51 130 82 59 213 68 1,471 0 3 0 0 3 5:00 PM 82 290 39 65 249 39 41 159 101 51 240 49 1,405 0 1 1 0 2 5:15 PM 93 360 49 59 271 54 48 127 61 52 217 65 1,456 0 1 2 0 3 5:30 PM 103 321 35 53 263 34 39 177 95 47 214 49 1,430 0 0 1 0 1 5:45 PM 88 281 32 44 240 40 49 136 71 41 169 52 1,243 0 1 2 2 5 VOLUMES 783 2,498 328 437 2,089 313 342 1,167 690 425 1,676 474 11,245 0 12 8 3 23 APPROACH % 22% 69% 9% 15% 73% 11% 15% 53% 31% 16% 65% 18% APP/DEPART 3,609 / 3,326 2,851 / 3,204 2,207 / 1,935 2,578 / 2,780 0

BEGIN PEAK HR
VOLUMES 373 1,322 169 233 1,068 162 179 593 339 209 884 231 5,771 0 5 4 0 APPROACH % 20% 71% 9% 16% 73% 11% 16% 53% 30% 16% 67% 17% PEAK HR FACTOR 0.928 0.953 0.893 0.974 0.979
APP/DEPART 1,864 / 1,737 1,468 / 1,616 1,115 / 995 1,324 / 1,423 0 Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 3 6 3 2 3 1 1 10 4 10 15 4 62 0 0 0 0 0
7:15 AM 3 5 8 4 5 3 2 10 6 11 18 3 78 0 0 0 0 0
7:30 AM 4 11 2 0 12 4 2 12 5 5 12 3 72 0 0 0 0 0
7:45 AM 3 9 2 3 10 4 2 12 4 4 19 3 75 0 0 0 0 0
8:00 AM 6 11 5 1 8 5 2 7 6 0 15 3 69 0 0 0 0 0
8:15 AM 7 18 3 4 8 3 4 10 5 4 15 3 84 0 0 0 0 0
8:30 AM 4 7 1 3 13 1 2 8 3 2 17 2 63 0 0 0 0 0
8:45 AM 3 9 3 3 9 2 4 12 6 3 17 2 73 0 0 0 0 0
VOLUMES 33 76 27 20 68 23 19 81 39 39 128 23 576 0 0 0 0 0 APPROACH % 24% 56% 20% 18% 61% 21% 14% 58% 28% 21% 67% 12% APP/DEPART 136 / 118 111 / 146 139 / 128 190 / 184 0

BEGIN PEAK HR
VOLUMES 20 45 11 11 39 13 10 37 18 10 66 11 291 0 0 0 0 APPROACH % 26% 59% 14% 17% 62% 21% 15% 57% 28% 11% 76% 13% PEAK HR FACTOR 0.679 0.926 0.855 0.837 0.866
APP/DEPART 76 / 66 63 / 67 65 / 59 87 / 99 0
4:00 PM 2 13 2 2 5 0 1 6 1 3 14 4 53 0 0 0 0 0
4:15 PM 3 12 4 0 5 0 0 8 1 3 11 1 48 0 0 0 0 0
4:30 PM 3 5 2 1 2 1 1 5 2 1 6 1 30 0 0 0 0 0
4:45 PM 2 14 1 0 4 1 0 8 0 2 7 1 40 0 0 0 0 0
5:00 PM 5 9 1 1 1 2 1 8 4 6 7 2 47 0 0 0 0 0
5:15 PM 0 4 2 0 3 0 1 5 3 1 2 2 23 0 0 0 0 0
5:30 PM 5 1 7 2 2 0 2 9 3 3 4 0 38 0 0 0 0 0
5:45 PM 2 6 2 0 0 0 0 5 1 0 6 1 23 0 0 0 0 0
VOLUMES 22 64 21 6 22 4 6 54 15 19 57 12 302 0 0 0 0 0
APPROACH % 21% 60% 20% 19% 69% 13% 8% 72% 20% 22% 65% 14% APP/DEPART 107 / 82 32 / 56 75 / 81 88 / 83 0

BEGIN PEAK HR
VOLUMES 12 28 11 3 10 3 4 30 10 12 20 5 148 0 0 0 0
APPROACH % 24% 55% 22% 19% 63% 19% 9% 68% 23% 32% 54% 14% PEAK HR FACTOR 0.750 0.800 0.786 0.617 0.787
APP/DEPART 51 / 37 16 / 32 44 / 44 37 / 35 0
Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 0 0 0 0 2 1 0 1 2 0 6 0 12 0 0 0 0 0
7:15 AM 1 3 0 0 3 0 0 1 2 0 3 1 14 0 0 0 0 0
7:30 AM 1 1 2 0 2 0 0 0 2 1 3 1 13 0 0 0 0 0
7:45 AM 0 1 0 0 0 0 1 1 1 2 1 0 7 0 0 0 0 0
8:00 AM 1 1 0 0 0 0 0 3 0 1 5 1 12 0 0 0 0 0
8:15 AM 0 4 2 0 3 0 1 3 0 3 4 0 20 0 0 0 0 0
8:30 AM 1 3 0 0 0 0 1 1 1 0 5 0 12 0 0 0 0 0
8:45 AM 0 0 0 0 1 0 0 3 1 0 4 0 9 0 0 0 0 0
VOLUMES 4 13 4 0 11 1 3 13 9 7 31 3 99 0 0 0 0 0
APPROACH % 19% 62% 19% 0% 92% 8% 12% 52% 36% 17% 76% 7% APP/DEPART 21 / 19 12 / 27 25 / 17 41 / 36 0

BEGIN PEAK HR
VOLUMES 2 9 2 0 3 0 3 8 2 6 15 1 51 0 0 0 0
APPROACH % 15% 69% 15% 0% 100% 0% 23% 62% 15% 27% 68% 5% PEAK HR FACTOR 0.542 0.250 0.813 0.786 0.638
APP/DEPART 13 / 13 3 / 11 13 / 10 22 / 17 0
4:00 PM 0 1 0 0 3 0 0 4 1 0 2 0 11 0 0 0 0 0
4:15 PM 1 1 1 0 0 1 0 2 0 0 0 0 6 0 0 0 0 0
4:30 PM 1 1 1 0 3 0 1 2 2 0 2 0 13 0 0 0 0 0
4:45 PM 0 0 0 1 0 0 0 1 0 0 3 0 5 0 0 0 0 0
5:00 PM 1 2 0 2 1 0 0 3 0 0 0 0 9 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
5:30 PM 0 1 0 0 1 0 0 2 2 1 1 0 8 0 0 0 0 0
5:45 PM 0 1 0 0 0 0 0 0 1 0 1 0 3 0 0 0 0 0
VOLUMES 3 7 2 3 8 1 1 15 6 1 10 0 57 0 0 0 0 0
APPROACH % 25% 58% 17% 25% 67% 8% 5% 68% 27% 9% 91% 0%
APP/DEPART 12 / 8 12 / 15 22 / 20 11 / 14 0

BEGIN PEAK HR
VOLUMES 1 3 0 3 2 0 0 7 2 1 5 0 24 0 0 0 0
APPROACH % 25% 75% 0% 60% 40% 0% 0% 78% 22% 17% 83% 0%
PEAK HR FACTOR 0.333 0.417 0.563 0.500 0.667
APP/DEPART 4 / 3 5 / 5 9 / 10 6 / 6 0
Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 0 3 0 1 8 1 0 3 0 3 4 0 23 0 0 0 0 0
7:15 AM 1 1 0 0 3 0 1 4 2 2 4 2 20 0 0 0 0 0
7:30 AM 0 1 0 0 2 1 0 7 1 0 6 0 18 0 0 0 0 0
7:45 AM 1 2 2 1 2 2 1 1 2 0 5 1 20 0 0 0 0 0
8:00 AM 0 2 0 2 2 1 2 2 2 1 5 1 20 0 0 0 0 0
8:15 AM 1 5 2 0 1 0 0 0 2 2 10 0 23 0 0 0 0 0
8:30 AM 1 2 0 0 2 0 1 5 1 0 4 1 17 0 0 0 0 0
8:45 AM 1 3 2 0 2 1 1 2 1 1 2 1 17 0 0 0 0 0
VOLUMES 5 19 6 4 22 6 6 24 11 9 40 6 158 0 0 0 0 0
APPROACH % 17% 63% 20% 13% 69% 19% 15% 59% 27% 16% 73% 11% APP/DEPART 30 / 31 32 / 42 41 / 34 55 / 51 0

BEGIN PEAK HR
VOLUMES 3 11 4 3 7 3 4 8 7 3 24 3 80 0 0 0 0
APPROACH % 17% 61% 22% 23% 54% 23% 21% 42% 37% 10% 80% 10% PEAK HR FACTOR 0.563 0.650 0.679 0.625 0.870
APP/DEPART 18 / 18 13 / 17 19 / 15 30 / 30 0
4:00 PM 0 3 1 1 1 1 0 1 1 2 2 1 14 0 0 0 0 0
4:15 PM 0 5 1 0 1 0 0 0 1 0 1 0 9 0 0 0 0 0
4:30 PM 1 2 0 0 3 0 0 3 1 1 1 0 12 0 0 0 0 0
4:45 PM 0 0 0 0 2 0 1 3 0 2 4 1 13 0 0 0 0 0
5:00 PM 0 1 2 0 0 0 0 3 0 2 0 0 8 0 0 0 0 0
5:15 PM 1 1 0 0 0 1 0 1 1 0 1 0 6 0 0 0 0 0
5:30 PM 0 2 1 0 1 0 0 0 0 0 2 0 6 0 0 0 0 0
5:45 PM 0 2 1 0 2 0 0 1 0 0 1 0 7 0 0 0 0 0
VOLUMES 2 16 6 1 10 2 1 12 4 7 12 2 75 0 0 0 0 0
APPROACH % 8% 67% 25% 8% 77% 15% 6% 71% 24% 33% 57% 10% APP/DEPART 24 / 19 13 / 21 17 / 19 21 / 16 0

BEGIN PEAK HR
VOLUMES 1 4 3 0 3 1 1 7 1 4 7 1 33 0 0 0 0
APPROACH % 13% 50% 38% 0% 75% 25% 11% 78% 11% 33% 58% 8% PEAK HR FACTOR 0.667 0.500 0.563 0.429 0.635
APP/DEPART 8 / 6 4 / 8 9 / 10 12 / 9 0
Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 1 0 0 0 0 0 0 1 0 0 0 2 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 1 0 0 0 0 0 0 1 0 0 0 2 0 0 0 0 0
APPROACH % 0% 100% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0%
APP/DEPART 1 / 1 0 / 1 1 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 1 0 0 0 0 0 0 1 0 0 0 2 0 0 0 0
APPROACH % 0% 100% 0% 0% 0% 0% 0% 0% 100% 0% 0% 0%
PEAK HR FACTOR 0.250 0.000 0.250 0.000 0.250
APP/DEPART 1 / 1 0 / 1 1 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:00 PM 1 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 1 0 0 0 0 0 0 2 0 0 2 0 5 0 0 0 0 0
APPROACH % 100% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
APP/DEPART 1 / 0 0 / 0 2 / 2 2 / 3 0

BEGIN PEAK HR
VOLUMES 1 0 0 0 0 0 0 2 0 0 1 0 4 0 0 0 0
APPROACH % 100% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.250 0.000 0.500 0.250 1.000
APP/DEPART 1 / 0 0 / 0 2 / 2 1 / 2 0
Coffee Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 2
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 3 1 2 3 1
7:00 AM 0 0 0 0 2 0 0 1 0 1 2 0 6 0 0 0 0 0
7:15 AM 0 1 0 1 0 0 0 0 0 3 2 1 8 0 0 0 0 0
7:30 AM 0 0 0 1 0 2 0 0 0 0 3 0 6 0 0 0 0 0
7:45 AM 1 0 1 0 1 1 2 2 0 0 2 2 12 0 0 0 0 0
8:00 AM 0 1 5 0 1 0 0 2 1 0 0 0 10 0 0 0 0 0
8:15 AM 2 2 2 2 1 1 0 3 0 1 2 0 16 0 0 0 0 0
8:30 AM 0 1 4 1 0 0 0 0 1 1 0 0 8 0 0 0 0 0
8:45 AM 0 0 0 0 1 1 0 1 0 0 0 0 3 0 0 0 0 0
VOLUMES 3 5 12 5 6 5 2 9 2 6 11 3 69 0 0 0 0 0
APPROACH % 15% 25% 60% 31% 38% 31% 15% 69% 15% 30% 55% 15% APP/DEPART 20 / 10 16 / 14 13 / 26 20 / 19 0

BEGIN PEAK HR
VOLUMES 3 4 12 3 3 2 2 7 2 2 4 2 46 0 0 0 0
APPROACH % 16% 21% 63% 38% 38% 25% 18% 64% 18% 25% 50% 25% PEAK HR FACTOR 0.792 0.500 0.688 0.500 0.719
APP/DEPART 19 / 8 8 / 7 11 / 22 8 / 9 0
4:00 PM 2 3 2 0 0 0 0 0 1 0 0 0 8 0 0 0 0 0
4:15 PM 0 1 0 0 0 1 0 1 0 1 1 0 5 0 0 0 0 0
4:30 PM 0 1 0 1 1 0 0 1 0 1 2 0 7 0 0 0 0 0
4:45 PM 0 0 0 0 3 2 0 1 1 0 0 0 7 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:15 PM 1 0 0 1 0 0 0 0 0 0 1 0 3 0 0 0 0 0
5:30 PM 0 1 0 1 0 0 0 0 0 0 0 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 1 1 0 1 0 0 0 0 3 0 0 0 0 0
VOLUMES 3 6 2 3 5 4 0 5 2 2 4 0 36 0 0 0 0 0
APPROACH % 27% 55% 18% 25% 42% 33% 0% 71% 29% 33% 67% 0% APP/DEPART 11 / 6 12 / 9 7 / 10 6 / 11 0

BEGIN PEAK HR
VOLUMES 1 1 0 2 3 2 0 2 1 0 1 0 13 0 0 0 0
APPROACH % 50% 50% 0% 29% 43% 29% 0% 67% 33% 0% 100% 0% PEAK HR FACTOR 0.500 0.350 0.375 0.250 0.464
APP/DEPART 2 / 1 7 / 4 3 / 4 1 / 4 0
Coffee Rd

NORTH SIDE
Rosedale HwyWEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Coffee Rd AM
7:45 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Rosedale Hwy Rosedale Hwy
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 3
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1 0 0 0 0
7:00 AM 0 0 0 19 0 4 12 228 0 0 103 9 375 0 0 0 0 0
7:15 AM 0 0 0 21 0 4 10 221 0 0 95 8 359 0 0 0 0 0
7:30 AM 0 0 0 20 0 6 10 319 0 0 171 9 535 0 0 1 0 1
7:45 AM 0 0 0 16 0 18 9 332 0 0 199 15 589 0 0 1 0 1
8:00 AM 0 0 0 19 0 9 20 266 0 0 165 11 490 0 0 0 0 0
8:15 AM 0 0 0 21 0 15 23 250 0 0 169 19 497 0 0 1 0 1
8:30 AM 0 0 0 29 0 12 8 219 0 0 152 17 437 0 0 1 0 1
8:45 AM 0 0 0 16 0 13 24 197 0 0 198 21 469 0 0 1 0 1
VOLUMES 0 0 0 161 0 81 116 2,032 0 0 1,252 109 3,756 0 0 5 0 5 APPROACH % 0% 0% 0% 67% 0% 33% 5% 94% 0% 0% 92% 8%
APP/DEPART 0 / 225 242 / 0 2,153 / 2,193 1,361 / 1,338 0

BEGIN PEAK HR
VOLUMES 0 0 0 76 0 48 62 1,167 0 0 704 54 2,114 0 0 3 0 APPROACH % 0% 0% 0% 61% 0% 39% 5% 95% 0% 0% 93% 7%
PEAK HR FACTOR 0.000 0.861 0.901 0.886 0.896
APP/DEPART 0 / 116 124 / 0 1,232 / 1,243 758 / 755 0
4:00 PM 0 0 0 55 0 33 30 243 0 0 317 27 705 0 0 1 0 1
4:15 PM 0 0 0 39 0 30 41 225 0 0 322 25 682 0 0 3 0 3
4:30 PM 0 0 0 33 0 30 38 240 0 0 328 39 708 0 0 4 0 4
4:45 PM 0 0 0 54 0 25 41 259 0 0 307 35 721 0 0 2 1 3
5:00 PM 0 0 0 40 0 25 38 276 0 0 329 26 734 0 0 1 1 2
5:15 PM 0 0 0 41 0 26 31 254 0 0 368 38 758 0 0 3 0 3
5:30 PM 0 0 0 30 0 30 36 273 0 0 318 28 715 0 0 2 0 2
5:45 PM 0 0 0 40 0 30 32 260 0 0 288 46 696 0 0 0 0 0
VOLUMES 0 0 0 332 0 229 287 2,030 0 0 2,577 264 5,737 0 0 16 2 18 APPROACH % 0% 0% 0% 59% 0% 41% 12% 87% 0% 0% 91% 9%
APP/DEPART 0 / 551 561 / 0 2,333 / 2,364 2,843 / 2,822 0

BEGIN PEAK HR
VOLUMES 0 0 0 165 0 106 146 1,062 0 0 1,322 127 2,938 0 0 8 2 APPROACH % 0% 0% 0% 61% 0% 39% 12% 87% 0% 0% 91% 9%
PEAK HR FACTOR 0.000 0.858 0.965 0.893 0.965
APP/DEPART 0 / 273 271 / 0 1,216 / 1,229 1,451 / 1,436 0 Northwest Promenade

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Northwest Promenade

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 1 0 1 2 0 0 0 0 0 0 1 0 1 2
4:30 PM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1
5:30 PM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
5:45 PM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
TOTAL 3 2 0 1 6 3 0 0 0 3 0 2 0 1 3

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Northwest Promenade
Rosedale Hwy

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS
[ ]
[ ]
803 310 0 493 TOTAL 776
561 229 0 332 PM 551
242 81 0 161 AM 225 1,361 2,843 4,204 4,160 2,822 1,338 109 264 373 1,252 2,577 3,829 TOTAL PMAM0 0 0 403 287 116 AMPM TOTAL 4,062 2,030 2,032 0 0 0 2,193 2,364 4,557 4,486 2,333 2,153 0 AM 0 0 0 0
0 PM 0 0 0 0
0 TOTAL 0 0 0 0
395 154 0 241 TOTAL 389
271 106 0 165 PM 273
124 48 0 76 AM 116 758 1,451 2,209 2,191 1,436 755 54 127 181 704 1,322 2,026 TOTAL PMAMAM 7:30 AM 8:45 AM 0 0 0 208 146 62
#N/A AMPM TOTAL 2,229 1,062 1,167 PM 4:45 PM
3:45 PM 0 0 0 1,243 1,229 2,472 2,448 1,216 1,232
0 AM 0 0 0 0
0 PM 0 0 0 0
0 Total 0 0 0 0
Northwest Promenade
AimTD LLC

TURNING MOVEMENT COUNTS
Northwest Promenade Rosedale HwyRosedale Hwy ALL HOURS
Northwest Promenade
Northwest Promenade Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC5147
I I ] A A A
V V [ I I
I I ] A A A
V V [ I I
j
[
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 26 0 4 13 253 0 0 127 9 431 0
7:15 AM 0 0 0 26 0 4 12 249 0 0 115 10 415 0
7:30 AM 0 0 0 23 0 6 12 349 0 0 195 10 595 0
7:45 AM 0 0 0 17 0 20 9 357 0 0 225 17 644 0
8:00 AM 0 0 0 23 0 9 20 287 0 0 196 14 548 0
8:15 AM 0 0 0 24 0 15 26 272 0 0 193 21 550 0
8:30 AM 0 0 0 31 0 12 8 237 0 0 170 19 477 0
8:45 AM 0 0 0 17 0 13 25 219 0 0 230 23 526 0
VOLUMES 0 0 0 185 0 83 124 2,223 0 0 1,450 121 4,184 0 0 0 0 0 APPROACH % 0% 0% 0% 69% 0% 31% 5% 95% 0% 0% 92% 8%
APP/DEPART 0 / 245 267 / 0 2,346 / 2,407 1,571 / 1,532 0

BEGIN PEAK HR
VOLUMES 0 0 0 86 0 50 67 1,265 0 0 808 61 2,336
APPROACH % 0% 0% 0% 63% 0% 37% 5% 95% 0% 0% 93% 7%
PEAK HR FACTOR 0.000 0.869 0.909 0.899 0.907
APP/DEPART 0 / 128 136 / 0 1,332 / 1,351 869 / 857 0
4:00 PM 0 0 0 57 0 33 30 254 0 0 336 29 739 0
4:15 PM 0 0 0 41 0 31 42 236 0 0 334 26 709 0
4:30 PM 0 0 0 35 0 32 40 255 0 0 343 41 744 0
4:45 PM 0 0 0 55 0 25 42 284 0 0 319 39 763 0
5:00 PM 0 0 0 41 0 25 39 290 0 0 340 27 761 0
5:15 PM 0 0 0 41 0 26 33 268 0 0 374 40 782 0
5:30 PM 0 0 0 30 0 30 36 285 0 0 325 28 734 0
5:45 PM 0 0 0 40 0 30 33 268 0 0 301 47 718 0
VOLUMES 0 0 0 339 0 232 293 2,139 0 0 2,671 277 5,949 0 0 0 0 0 APPROACH % 0% 0% 0% 59% 0% 41% 12% 88% 0% 0% 91% 9%
APP/DEPART 0 / 569 571 / 0 2,431 / 2,478 2,947 / 2,902 0

BEGIN PEAK HR
VOLUMES 0 0 0 167 0 106 149 1,127 0 0 1,358 134 3,040
APPROACH % 0% 0% 0% 61% 0% 39% 12% 88% 0% 0% 91% 9%
PEAK HR FACTOR 0.000 0.857 0.971 0.900 0.972
APP/DEPART 0 / 283 273 / 0 1,276 / 1,294 1,491 / 1,464 0 Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 15 0 4 11 205 0 0 76 9 320 0 0 0 0 0
7:15 AM 0 0 0 15 0 4 9 195 0 0 75 6 304 0 0 0 0 0
7:30 AM 0 0 0 14 0 6 7 280 0 0 141 8 456 0 0 1 0 1
7:45 AM 0 0 0 15 0 16 9 305 0 0 171 13 529 0 0 1 0 1
8:00 AM 0 0 0 15 0 9 20 242 0 0 133 9 428 0 0 0 0 0
8:15 AM 0 0 0 19 0 15 20 225 0 0 143 17 439 0 0 1 0 1
8:30 AM 0 0 0 25 0 12 8 192 0 0 130 16 383 0 0 1 0 1
8:45 AM 0 0 0 15 0 13 23 173 0 0 160 19 403 0 0 1 0 1
VOLUMES 0 0 0 133 0 79 107 1,817 0 0 1,029 97 3,267 0 0 5 0 5 APPROACH % 0% 0% 0% 63% 0% 37% 6% 94% 0% 0% 91% 9%
APP/DEPART 0 / 204 212 / 0 1,929 / 1,950 1,126 / 1,113 0

BEGIN PEAK HR
VOLUMES 0 0 0 63 0 46 56 1,052 0 0 588 47 1,855 0 0 3 0 APPROACH % 0% 0% 0% 58% 0% 42% 5% 95% 0% 0% 93% 7%
PEAK HR FACTOR 0.000 0.801 0.882 0.863 0.875
APP/DEPART 0 / 103 109 / 0 1,111 / 1,115 635 / 637 0
4:00 PM 0 0 0 51 0 33 30 229 0 0 297 26 666 0 0 1 0 1
4:15 PM 0 0 0 38 0 29 40 214 0 0 303 24 648 0 0 3 0 3
4:30 PM 0 0 0 30 0 29 36 224 0 0 310 36 665 0 0 4 0 4
4:45 PM 0 0 0 53 0 25 40 235 0 0 294 32 679 0 0 2 1 3
5:00 PM 0 0 0 38 0 25 37 258 0 0 317 25 700 0 0 1 1 2
5:15 PM 0 0 0 41 0 26 29 238 0 0 361 36 731 0 0 3 0 3
5:30 PM 0 0 0 30 0 30 36 260 0 0 309 28 693 0 0 2 0 2
5:45 PM 0 0 0 40 0 30 31 252 0 0 273 45 671 0 0 0 0 0
VOLUMES 0 0 0 321 0 227 279 1,910 0 0 2,464 252 5,471 0 0 16 2 18 APPROACH % 0% 0% 0% 59% 0% 41% 13% 87% 0% 0% 91% 9%
APP/DEPART 0 / 531 548 / 0 2,205 / 2,233 2,718 / 2,707 0

BEGIN PEAK HR
VOLUMES 0 0 0 162 0 106 142 991 0 0 1,281 121 2,813 0 0 8 2 APPROACH % 0% 0% 0% 60% 0% 40% 12% 87% 0% 0% 91% 9%
PEAK HR FACTOR 0.000 0.859 0.957 0.884 0.958
APP/DEPART 0 / 263 268 / 0 1,141 / 1,155 1,404 / 1,395 0 Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 1 0 0 1 10 0 0 16 0 28 0 0 0 0 0
7:15 AM 0 0 0 5 0 0 0 13 0 0 10 1 29 0 0 0 0 0
7:30 AM 0 0 0 6 0 0 2 28 0 0 19 0 55 0 0 0 0 0
7:45 AM 0 0 0 1 0 1 0 16 0 0 15 0 33 0 0 0 0 0
8:00 AM 0 0 0 3 0 0 0 16 0 0 18 1 38 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 1 16 0 0 17 1 35 0 0 0 0 0
8:30 AM 0 0 0 4 0 0 0 22 0 0 16 0 42 0 0 0 0 0
8:45 AM 0 0 0 1 0 0 1 14 0 0 26 1 43 0 0 0 0 0
VOLUMES 0 0 0 21 0 1 5 135 0 0 137 4 303 0 0 0 0 0
APPROACH % 0% 0% 0% 95% 0% 5% 4% 96% 0% 0% 97% 3%
APP/DEPART 0 / 9 22 / 0 140 / 156 141 / 138 0

BEGIN PEAK HR
VOLUMES 0 0 0 10 0 1 3 76 0 0 69 2 161 0 0 0 0
APPROACH % 0% 0% 0% 91% 0% 9% 4% 96% 0% 0% 97% 3%
PEAK HR FACTOR 0.000 0.458 0.658 0.934 0.732
APP/DEPART 0 / 5 11 / 0 79 / 86 71 / 70 0
4:00 PM 0 0 0 4 0 0 0 10 0 0 13 0 27 0 0 0 0 0
4:15 PM 0 0 0 0 0 1 1 7 0 0 16 0 25 0 0 0 0 0
4:30 PM 0 0 0 3 0 0 1 11 0 0 11 2 28 0 0 0 0 0
4:45 PM 0 0 0 1 0 0 1 10 0 0 8 1 21 0 0 0 0 0
5:00 PM 0 0 0 2 0 0 1 12 0 0 7 0 22 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 10 0 0 4 0 14 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 8 0 0 6 0 14 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 1 5 0 0 10 0 16 0 0 0 0 0
VOLUMES 0 0 0 10 0 1 5 73 0 0 75 3 167 0 0 0 0 0
APPROACH % 0% 0% 0% 91% 0% 9% 6% 94% 0% 0% 96% 4%
APP/DEPART 0 / 8 11 / 0 78 / 83 78 / 76 0

BEGIN PEAK HR
VOLUMES 0 0 0 3 0 0 2 40 0 0 25 1 71 0 0 0 0
APPROACH % 0% 0% 0% 100% 0% 0% 5% 95% 0% 0% 96% 4%
PEAK HR FACTOR 0.000 0.375 0.808 0.722 0.807
APP/DEPART 0 / 3 3 / 0 42 / 43 26 / 25 0
Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 0 0 0 0 5 0 0 4 0 9 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 4 0 0 3 0 7 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 4 0 0 3 0 7 0 0 0 0 0
7:45 AM 0 0 0 0 0 1 0 2 0 0 6 0 9 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 5 0 5 0 0 0 0 0
8:15 AM 0 0 0 1 0 0 0 4 0 0 3 0 8 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 3 0 0 2 0 5 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 4 0 0 5 0 9 0 0 0 0 0
VOLUMES 0 0 0 1 0 1 0 26 0 0 31 0 59 0 0 0 0 0
APPROACH % 0% 0% 0% 50% 0% 50% 0% 100% 0% 0% 100% 0%
APP/DEPART 0 / 0 2 / 0 26 / 27 31 / 32 0

BEGIN PEAK HR
VOLUMES 0 0 0 1 0 1 0 10 0 0 17 0 29 0 0 0 0
APPROACH % 0% 0% 0% 50% 0% 50% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.500 0.625 0.708 0.806
APP/DEPART 0 / 0 2 / 0 10 / 11 17 / 18 0
4:00 PM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 1 0 0 5 0 6 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 7 0 0 2 0 9 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 4 0 0 2 0 6 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 3 0 0 2 1 6 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 21 0 0 17 1 39 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 94% 6%
APP/DEPART 0 / 1 0 / 0 21 / 21 18 / 17 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 16 0 0 8 1 25 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 89% 11%
PEAK HR FACTOR 0.000 0.000 0.571 0.750 0.694
APP/DEPART 0 / 1 0 / 0 16 / 16 9 / 8 0
Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 3 0 0 0 7 0 0 5 0 15 0 0 0 0 0
7:15 AM 0 0 0 1 0 0 1 8 0 0 5 0 15 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 5 0 0 3 0 8 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 6 0 0 5 0 11 0 0 0 0 0
8:00 AM 0 0 0 1 0 0 0 5 0 0 8 1 15 0 0 0 0 0
8:15 AM 0 0 0 1 0 0 0 5 0 0 6 0 12 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 2 0 0 4 1 7 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 5 0 0 7 0 12 0 0 0 0 0
VOLUMES 0 0 0 6 0 0 1 43 0 0 43 2 95 0 0 0 0 0
APPROACH % 0% 0% 0% 100% 0% 0% 2% 98% 0% 0% 96% 4%
APP/DEPART 0 / 3 6 / 0 44 / 49 45 / 43 0

BEGIN PEAK HR
VOLUMES 0 0 0 2 0 0 0 21 0 0 22 1 46 0 0 0 0
APPROACH % 0% 0% 0% 100% 0% 0% 0% 100% 0% 0% 96% 4%
PEAK HR FACTOR 0.000 0.500 0.875 0.639 0.767
APP/DEPART 0 / 1 2 / 0 21 / 23 23 / 22 0
4:00 PM 0 0 0 0 0 0 0 2 0 0 5 1 8 0 0 0 0 0
4:15 PM 0 0 0 1 0 0 0 3 0 0 1 0 5 0 0 0 0 0
4:30 PM 0 0 0 0 0 1 0 4 0 0 2 0 7 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 6 0 0 3 1 10 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 3 0 0 1 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 3 0 0 1 0 4 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 2 0 0 3 0 5 0 0 0 0 0
VOLUMES 0 0 0 1 0 1 0 25 0 0 18 2 47 0 0 0 0 0
APPROACH % 0% 0% 0% 50% 0% 50% 0% 100% 0% 0% 90% 10%
APP/DEPART 0 / 2 2 / 0 25 / 26 20 / 19 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 14 0 0 7 1 22 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 88% 13%
PEAK HR FACTOR 0.000 0.000 0.583 0.500 0.550
APP/DEPART 0 / 1 0 / 0 14 / 14 8 / 7 0
Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Northwest Promenade

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Northwest Promenade LOCATION #: 3 THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: X X X 2 X 1 2 3 X X 3 1
7:00 AM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 1 0 0 2 1 4 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 1 2 0 0 5 1 9 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 3 0 0 2 2 7 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 3 0 0 1 0 4 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 2 0 0 0 0 1 3 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 1 0 0 0 1 2 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 3 11 0 0 12 6 32 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 21% 79% 0% 0% 67% 33%
APP/DEPART 0 / 9 0 / 0 14 / 11 18 / 12 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 3 8 0 0 8 4 23 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 27% 73% 0% 0% 67% 33%
PEAK HR FACTOR 0.000 0.000 0.917 0.500 0.639
APP/DEPART 0 / 7 0 / 0 11 / 8 12 / 8 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 1 0 0 0 0 1 2 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 1 0 0 0 1 2 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 2 0 0 0 0 1 3 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 1 1 2 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 3 1 0 0 3 6 13 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 75% 25% 0% 0% 33% 67%
APP/DEPART 0 / 9 0 / 0 4 / 1 9 / 3 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 2 1 0 0 1 3 7 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 67% 33% 0% 0% 25% 75%
PEAK HR FACTOR 0.000 0.000 0.375 0.500 0.583
APP/DEPART 0 / 5 0 / 0 3 / 1 4 / 1 0
Northwest Promenade

NORTH SIDE
WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Northwest Promenade
Rosedale Hwy

U-TURNS
Northwest Promenade Northwest Promenade Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 4
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1 0 0 0 0
7:00 AM 1 4 19 35 1 21 13 184 0 3 92 6 379 0 0 0 2 2
7:15 AM 2 3 13 29 3 17 16 197 3 2 82 9 376 0 0 1 0 1
7:30 AM 3 7 16 67 3 20 21 245 1 5 146 18 552 0 0 0 0 0
7:45 AM 3 7 10 42 6 36 45 291 5 3 165 22 635 0 0 1 0 1
8:00 AM 3 6 6 50 4 25 30 229 0 3 167 20 543 0 0 5 0 5
8:15 AM 0 2 10 47 10 19 18 220 3 1 146 20 496 0 1 4 0 5 8:30 AM 1 3 6 29 4 18 30 198 3 8 147 20 467 0 1 4 1 6
8:45 AM 1 3 10 33 3 22 21 178 2 5 183 14 475 0 1 0 0 1
VOLUMES 14 35 90 332 34 178 194 1,742 17 30 1,128 129 3,944 0 3 15 3 21 APPROACH % 10% 25% 65% 61% 6% 33% 10% 89% 1% 2% 87% 10% APP/DEPART 139 / 361 547 / 81 1,968 / 2,167 1,290 / 1,335 0

BEGIN PEAK HR
VOLUMES 9 22 42 206 23 100 114 985 9 12 624 80 2,237 0 1 10 0 APPROACH % 12% 30% 58% 62% 7% 30% 10% 88% 1% 2% 87% 11% PEAK HR FACTOR 0.702 0.917 0.817 0.942 0.879
APP/DEPART 73 / 217 330 / 44 1,118 / 1,233 716 / 743 0
4:00 PM 3 8 11 50 9 40 38 215 4 6 302 33 719 0 2 3 2 7
4:15 PM 6 4 5 46 7 28 40 216 1 12 297 38 700 0 1 6 1 8
4:30 PM 2 8 9 59 12 34 38 208 5 7 308 24 714 0 2 6 3 11 4:45 PM 6 7 7 56 6 31 38 231 2 17 296 29 726 0 7 6 4 17 5:00 PM 4 4 11 56 9 45 32 237 5 13 312 40 768 0 2 11 3 16 5:15 PM 2 3 7 42 8 35 39 245 7 7 330 40 765 0 5 11 2 18 5:30 PM 5 5 5 65 10 31 34 240 4 11 290 36 736 0 3 5 3 11 5:45 PM 5 3 6 66 5 25 39 214 9 12 272 32 688 0 4 6 4 14 VOLUMES 33 42 61 440 66 269 298 1,806 37 85 2,407 272 5,918 0 26 54 22 102 APPROACH % 24% 31% 45% 55% 8% 34% 14% 82% 2% 3% 86% 10% APP/DEPART 136 / 638 801 / 188 2,195 / 2,329 2,786 / 2,763 0

BEGIN PEAK HR
VOLUMES 17 19 30 219 33 142 143 953 18 48 1,228 145 3,057 0 17 33 12 APPROACH % 26% 29% 45% 53% 8% 35% 12% 83% 2% 3% 86% 10% PEAK HR FACTOR 0.825 0.917 0.950 0.945 0.975
APP/DEPART 66 / 324 411 / 99 1,147 / 1,214 1,433 / 1,420 0 Clay Patrick Farr Way

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
El Toro Viejo Rd

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 2 2 0 0 0 2 2 0 0 0 0 0
8:00 AM 0 0 0 2 2 0 0 0 1 1 0 0 0 1 1
8:15 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 2 0 0 2 0 1 0 0 1 0 1 0 0 1
TOTAL 0 2 0 6 8 0 1 0 4 5 0 1 0 2 3
4:00 PM 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 1 1 0 1 3 1 0 0 0 1 0 1 0 1 2
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 2 0 0 0 2 2 0 0 0 2 0 0 0 0 0
TOTAL 4 1 0 2 7 4 0 0 0 4 0 1 0 2 3

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
El Toro Viejo Rd
Rosedale Hwy

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS
[ ]
[ ]
1,348 447 100 772 TOTAL 999
801 269 66 440 PM 638
547 178 34 332 AM 361 1,290 2,786 4,076 4,098 2,763 1,335 129 272 401 1,128 2,407 3,535 TOTAL PMAM30 85 115 492 298 194 AMPM TOTAL 3,548 1,806 1,742 54 37 17 2,167 2,329 4,496 4,163 2,195 1,968 81 AM 14 35 90 139
188 PM 33 42 61 136
269 TOTAL 47 77 151 275
741 242 56 425 TOTAL 541
411 142 33 219 PM 324
330 100 23 206 AM 217 716 1,433 2,149 2,163 1,420 743 80 145 225 624 1,228 1,852 TOTAL PMAMAM 7:30 AM 8:45 AM 12 48 60 257 143 114
#N/A AMPM TOTAL 1,938 953 985 PM 4:45 PM
3:45 PM 27 18 9 1,233 1,214 2,447 2,265 1,147 1,118
44 AM 9 22 42 73
99 PM 17 19 30 66
143 Total 26 41 72 139
El Toro Viejo Rd
AimTD LLC

TURNING MOVEMENT COUNTS
Clay Patrick Farr Way Rosedale HwyRosedale Hwy ALL HOURS El Toro Viejo Rd
Clay Patrick Farr Way Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC5147
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 1 4 24 36 1 22 18 202 0 4 112 10 432 0
7:15 AM 2 4 13 33 3 19 19 224 4 3 100 11 434 0
7:30 AM 3 7 20 72 3 20 24 272 1 5 170 19 614 0
7:45 AM 3 7 10 47 7 39 47 312 7 3 184 25 690 0
8:00 AM 3 6 6 54 4 30 31 247 0 4 195 23 602 0
8:15 AM 0 2 10 52 10 24 18 238 3 1 162 24 543 0
8:30 AM 2 6 6 32 4 22 34 214 3 8 166 20 515 0
8:45 AM 1 3 12 35 3 26 24 199 2 6 215 16 540 0
VOLUMES 15 39 101 359 35 200 214 1,906 20 33 1,302 146 4,368 0 0 0 0 0 APPROACH % 9% 25% 65% 60% 6% 34% 10% 89% 1% 2% 88% 10%
APP/DEPART 155 / 399 593 / 88 2,140 / 2,366 1,481 / 1,516 0

BEGIN PEAK HR
VOLUMES 9 22 46 224 24 112 120 1,069 11 13 711 90 2,448 APPROACH % 12% 29% 60% 62% 7% 31% 10% 89% 1% 2% 87% 11% PEAK HR FACTOR 0.642 0.951 0.820 0.919 0.887
APP/DEPART 77 / 231 360 / 47 1,199 / 1,339 813 / 832 0
4:00 PM 3 8 11 50 9 41 40 226 4 8 316 34 749 0
4:15 PM 6 4 5 48 7 30 41 227 1 12 306 39 725 0
4:30 PM 2 8 11 61 12 35 38 220 5 9 323 24 747 0
4:45 PM 6 7 7 56 6 31 40 259 2 20 304 29 766 0
5:00 PM 5 4 11 57 9 48 33 248 6 16 321 40 796 0
5:15 PM 3 3 7 44 8 40 40 259 8 7 336 40 793 0
5:30 PM 5 5 5 65 11 37 34 251 4 13 296 36 762 0
5:45 PM 5 3 6 67 5 26 40 222 12 13 285 33 716 0
VOLUMES 35 42 63 447 67 287 305 1,910 41 98 2,485 275 6,052 0 0 0 0 0 APPROACH % 25% 30% 45% 56% 8% 36% 14% 85% 2% 3% 87% 10% APP/DEPART 140 / 621 800 / 205 2,256 / 2,420 2,857 / 2,806 0

BEGIN PEAK HR
VOLUMES 19 19 30 222 34 156 146 1,017 19 56 1,256 145 3,116 APPROACH % 27% 28% 44% 54% 8% 38% 12% 86% 2% 4% 86% 10% PEAK HR FACTOR 0.844 0.904 0.965 0.952 0.978
APP/DEPART 68 / 310 411 / 108 1,182 / 1,268 1,456 / 1,430 0 Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 1 4 16 33 1 19 9 167 0 1 71 3 325 0 0 0 1 1
7:15 AM 2 2 13 25 3 14 14 174 2 1 68 7 325 0 0 1 0 1
7:30 AM 3 7 11 64 3 20 19 211 1 5 117 17 478 0 0 0 0 0
7:45 AM 3 7 10 38 5 33 42 267 3 3 140 20 571 0 0 1 0 1
8:00 AM 3 6 6 45 4 20 29 206 0 2 136 18 475 0 0 5 0 5
8:15 AM 0 2 10 40 10 13 18 201 3 1 129 17 444 0 1 4 0 5 8:30 AM 0 1 6 24 4 13 24 173 3 8 124 20 400 0 1 4 1 6
8:45 AM 1 3 9 30 3 18 16 157 2 4 145 11 399 0 1 0 0 1
VOLUMES 13 32 81 299 33 150 171 1,556 14 25 930 113 3,437 0 3 15 2 20 APPROACH % 10% 25% 64% 62% 7% 31% 10% 89% 1% 2% 87% 11% APP/DEPART 126 / 319 485 / 72 1,756 / 1,938 1,070 / 1,108 0

BEGIN PEAK HR
VOLUMES 9 22 37 187 22 86 108 885 7 11 522 72 1,979 0 1 10 0 APPROACH % 13% 32% 54% 63% 7% 29% 11% 88% 1% 2% 86% 12% PEAK HR FACTOR 0.810 0.851 0.807 0.928 0.865
APP/DEPART 68 / 203 296 / 40 1,010 / 1,109 605 / 627 0
4:00 PM 3 8 11 50 9 39 36 198 4 5 285 32 680 0 2 3 2 7
4:15 PM 6 4 5 45 7 26 38 205 1 12 284 37 670 0 1 6 1 8
4:30 PM 2 8 8 56 12 32 38 196 5 6 287 24 674 0 2 6 3 11 4:45 PM 6 7 7 56 6 31 37 206 2 15 286 29 688 0 7 6 4 17 5:00 PM 2 4 11 55 9 42 31 222 4 11 302 40 733 0 2 11 3 16 5:15 PM 1 3 7 39 8 30 38 230 6 7 324 40 733 0 5 11 2 18 5:30 PM 5 5 5 65 9 28 34 226 4 9 282 36 708 0 3 5 3 11
5:45 PM 5 3 6 64 5 24 37 207 7 11 259 31 659 0 4 6 4 14 VOLUMES 30 42 60 430 65 252 289 1,690 33 76 2,309 269 5,647 0 26 54 22 102 APPROACH % 23% 32% 45% 56% 8% 33% 14% 82% 2% 3% 86% 10% APP/DEPART 132 / 626 773 / 174 2,066 / 2,202 2,676 / 2,645 0

BEGIN PEAK HR
VOLUMES 14 19 30 215 32 131 140 884 16 42 1,194 145 2,924 0 17 33 12 APPROACH % 22% 30% 48% 54% 8% 33% 13% 82% 1% 3% 86% 10% PEAK HR FACTOR 0.788 0.914 0.941 0.934 0.973
APP/DEPART 63 / 321 395 / 90 1,073 / 1,141 1,393 / 1,372 0 Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 0 0 0 2 0 2 1 7 0 2 13 1 28 0 0 0 1 1
7:15 AM 0 0 0 3 0 2 1 10 0 0 5 0 21 0 0 0 0 0
7:30 AM 0 0 4 1 0 0 1 24 0 0 19 1 50 0 0 0 0 0
7:45 AM 0 0 0 2 1 2 2 15 0 0 16 0 38 0 0 0 0 0
8:00 AM 0 0 0 2 0 3 0 18 0 1 18 1 43 0 0 0 0 0
8:15 AM 0 0 0 5 0 3 0 10 0 0 10 1 29 0 0 0 0 0
8:30 AM 1 0 0 5 0 3 4 21 0 0 17 0 51 0 0 0 0 0
8:45 AM 0 0 0 3 0 3 4 11 0 1 27 2 51 0 0 0 0 0
VOLUMES 1 0 4 23 1 18 13 116 0 4 125 6 312 0 0 0 1 1
APPROACH % 20% 0% 80% 55% 2% 43% 10% 90% 0% 3% 92% 4%
APP/DEPART 5 / 19 42 / 5 129 / 144 136 / 144 0

BEGIN PEAK HR
VOLUMES 0 0 4 10 1 8 3 67 0 1 63 3 160 0 0 0 0
APPROACH % 0% 0% 100% 53% 5% 42% 4% 96% 0% 1% 94% 4%
PEAK HR FACTOR 0.250 0.594 0.700 0.838 0.800
APP/DEPART 4 / 6 19 / 2 70 / 81 67 / 71 0
4:00 PM 0 0 0 0 0 1 1 14 0 0 13 0 29 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 2 7 0 0 10 1 20 0 0 0 0 0
4:30 PM 0 0 0 3 0 2 0 7 0 0 16 0 28 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 11 0 1 7 0 19 0 0 0 0 0
5:00 PM 2 0 0 1 0 2 1 10 1 0 7 0 24 0 0 0 0 0
5:15 PM 1 0 0 2 0 3 1 8 1 0 3 0 19 0 0 0 0 0
5:30 PM 0 0 0 0 1 0 0 10 0 0 6 0 17 0 0 0 0 0
5:45 PM 0 0 0 2 0 1 2 3 0 0 9 0 17 0 0 0 0 0
VOLUMES 3 0 0 8 1 9 7 70 2 1 71 1 173 0 0 0 0 0
APPROACH % 100% 0% 0% 44% 6% 50% 9% 89% 3% 1% 97% 1%
APP/DEPART 3 / 8 18 / 4 79 / 78 73 / 83 0

BEGIN PEAK HR
VOLUMES 3 0 0 3 1 5 2 39 2 1 23 0 79 0 0 0 0
APPROACH % 100% 0% 0% 33% 11% 56% 5% 91% 5% 4% 96% 0%
PEAK HR FACTOR 0.375 0.450 0.896 0.750 0.823
APP/DEPART 3 / 2 9 / 4 43 / 42 24 / 31 0
Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 0 0 0 0 0 0 1 6 0 0 2 0 9 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 3 1 1 3 0 8 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 2 0 0 6 0 8 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 1 1 0 0 6 0 8 0 0 0 0 0
8:15 AM 0 0 0 1 0 2 0 4 0 0 3 1 11 0 0 0 0 0
8:30 AM 0 0 0 0 0 2 2 3 0 0 2 0 9 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 4 0 0 4 1 9 0 0 0 0 0
VOLUMES 0 0 0 1 0 4 4 25 1 1 27 2 65 0 0 0 0 0
APPROACH % 0% 0% 0% 20% 0% 80% 13% 83% 3% 3% 90% 7%
APP/DEPART 0 / 6 5 / 2 30 / 26 30 / 31 0

BEGIN PEAK HR
VOLUMES 0 0 0 1 0 2 1 9 0 0 16 1 30 0 0 0 0
APPROACH % 0% 0% 0% 33% 0% 67% 10% 90% 0% 0% 94% 6%
PEAK HR FACTOR 0.000 0.250 0.625 0.708 0.682
APP/DEPART 0 / 2 3 / 0 10 / 10 17 / 18 0
4:00 PM 0 0 0 0 0 0 0 2 0 0 1 1 4 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 1 0 0 3 0 4 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 5 0 0 2 0 7 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 4 0 0 1 0 5 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 3 0 0 2 0 5 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 2 0 2 1 0 5 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 2 1 0 0 1 4 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 20 1 2 11 2 36 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 95% 5% 13% 73% 13%
APP/DEPART 0 / 2 0 / 3 21 / 20 15 / 11 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 14 0 2 6 0 22 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 25% 75% 0%
PEAK HR FACTOR 0.000 0.000 0.700 0.667 0.786
APP/DEPART 0 / 0 0 / 2 14 / 14 8 / 6 0
Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 0 0 2 0 0 0 1 4 0 0 5 1 13 0 0 0 0 0
7:15 AM 0 0 0 1 0 0 1 9 0 0 6 0 17 0 0 0 0 0
7:30 AM 0 0 1 2 0 0 1 5 0 0 4 0 13 0 0 0 0 0
7:45 AM 0 0 0 2 0 1 0 4 0 0 2 1 10 0 0 0 0 0
8:00 AM 0 0 0 0 0 1 0 4 0 0 6 1 12 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 4 0 0 4 1 9 0 0 0 0 0
8:30 AM 0 1 0 0 0 0 0 1 0 0 4 0 6 0 0 0 0 0
8:45 AM 0 0 1 0 0 1 0 5 0 0 7 0 14 0 0 0 0 0
VOLUMES 0 1 4 5 0 3 3 36 0 0 38 4 94 0 0 0 0 0
APPROACH % 0% 20% 80% 63% 0% 38% 8% 92% 0% 0% 90% 10%
APP/DEPART 5 / 8 8 / 0 39 / 45 42 / 41 0

BEGIN PEAK HR
VOLUMES 0 0 1 4 0 2 1 17 0 0 16 3 44 0 0 0 0
APPROACH % 0% 0% 100% 67% 0% 33% 6% 94% 0% 0% 84% 16%
PEAK HR FACTOR 0.250 0.500 0.750 0.679 0.846
APP/DEPART 1 / 4 6 / 0 18 / 22 19 / 18 0
4:00 PM 0 0 0 0 0 0 0 1 0 1 3 0 5 0 0 0 0 0
4:15 PM 0 0 0 1 0 0 0 3 0 0 1 0 5 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 0 3 0 1 2 0 7 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 1 8 0 1 1 0 11 0 0 0 0 0
5:00 PM 0 0 0 0 0 1 0 1 0 1 2 0 5 0 0 0 0 0
5:15 PM 0 0 0 0 0 1 0 3 0 0 1 0 5 0 0 0 0 0
5:30 PM 0 0 0 0 0 3 0 2 0 0 1 0 6 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 2 1 0 4 0 7 0 0 0 0 0
VOLUMES 0 0 1 1 0 5 1 23 1 4 15 0 51 0 0 0 0 0
APPROACH % 0% 0% 100% 17% 0% 83% 4% 92% 4% 21% 79% 0%
APP/DEPART 1 / 1 6 / 5 25 / 25 19 / 20 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 5 1 14 0 2 5 0 27 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 100% 7% 93% 0% 29% 71% 0%
PEAK HR FACTOR 0.000 0.417 0.417 0.583 0.614
APP/DEPART 0 / 1 5 / 2 15 / 14 7 / 10 0
Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Clay Patrick Farr Way

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: El Toro Viejo Rd LOCATION #: 4
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2 1 2 2 1 2 3 1 1 3 1
7:00 AM 0 0 1 0 0 0 1 0 0 0 1 1 4 0 0 0 0 0
7:15 AM 0 1 0 0 0 1 0 1 0 0 0 2 5 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 3 0 0 5 0 8 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 1 3 2 0 1 1 8 0 0 0 0 0
8:00 AM 0 0 0 3 0 1 0 0 0 0 1 0 5 0 0 0 0 0
8:15 AM 0 0 0 1 0 1 0 1 0 0 0 0 3 0 0 0 0 0
8:30 AM 0 1 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 1 1 0 0 0 0 2 0 0 0 0 0
VOLUMES 0 2 1 4 0 3 3 9 2 0 8 4 36 0 0 0 0 0
APPROACH % 0% 67% 33% 57% 0% 43% 21% 64% 14% 0% 67% 33% APP/DEPART 3 / 9 7 / 2 14 / 14 12 / 11 0

BEGIN PEAK HR
VOLUMES 0 0 0 4 0 2 1 7 2 0 7 1 24 0 0 0 0
APPROACH % 0% 0% 0% 67% 0% 33% 10% 70% 20% 0% 88% 13%
PEAK HR FACTOR 0.000 0.375 0.417 0.400 0.750
APP/DEPART 0 / 2 6 / 2 10 / 11 8 / 9 0
4:00 PM 0 0 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0
4:15 PM 0 0 0 0 0 2 0 0 0 0 1 0 3 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0
5:15 PM 0 0 0 1 0 1 0 1 0 0 0 0 3 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 1 0 3 1 3 0 2 1 0 11 0 0 0 0 0
APPROACH % 0% 0% 0% 25% 0% 75% 25% 75% 0% 67% 33% 0%
APP/DEPART 0 / 1 4 / 2 4 / 4 3 / 4 0

BEGIN PEAK HR
VOLUMES 0 0 0 1 0 1 0 2 0 1 0 0 5 0 0 0 0
APPROACH % 0% 0% 0% 50% 0% 50% 0% 100% 0% 100% 0% 0%
PEAK HR FACTOR 0.000 0.250 0.500 0.250 0.417
APP/DEPART 0 / 0 2 / 1 2 / 3 1 / 1 0
Clay Patrick Farr Way

NORTH SIDE
WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
El Toro Viejo Rd

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
El Toro Viejo Rd Clay Patrick Farr Way Rosedale Hwy Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:45 PM
T020624
DATE: LOCATION: PROJECT #: SC4983
Thu, Oct 24, 24 NORTH & SOUTH: LOCATION #: 5
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1 0 0 0 0
7:00 AM 27 115 32 15 168 28 17 73 26 55 113 17 686 1 0 2 1 4 7:15 AM 34 114 25 15 175 40 23 90 28 64 142 11 761 0 2 1 4 7 7:30 AM 41 140 33 17 239 51 24 93 37 75 163 26 939 3 0 13 3 19 7:45 AM 70 190 51 26 253 68 34 113 40 66 175 25 1,111 9 1 13 7 30 8:00 AM 64 155 51 18 223 63 24 115 29 71 169 18 1,000 1 0 2 12 15 8:15 AM 50 132 41 23 194 68 40 92 34 69 148 28 919 3 0 4 6 13 8:30 AM 37 137 47 22 194 52 34 128 47 51 140 23 912 0 0 4 6 10 8:45 AM 47 131 44 12 161 56 29 101 32 47 128 22 810 1 0 4 7 12 VOLUMES 370 1,114 324 148 1,607 426 225 805 273 498 1,178 170 7,248 18 3 43 46 110 APPROACH % 20% 61% 18% 7% 74% 20% 17% 60% 20% 26% 62% 9% APP/DEPART 1,826 / 1,512 2,184 / 2,396 1,346 / 1,323 1,892 / 2,017 0

BEGIN PEAK HR
VOLUMES 225 617 176 84 909 250 122 413 140 281 655 97 4,046 16 1 32 28 APPROACH % 22% 60% 17% 7% 73% 20% 17% 58% 20% 26% 62% 9% PEAK HR FACTOR 0.808 0.894 0.884 0.972 0.887
APP/DEPART 1,034 / 837 1,244 / 1,346 707 / 701 1,061 / 1,162 0 4:00 PM 73 259 86 25 188 42 56 186 68 54 146 38 1,221 0 0 11 11 22 4:15 PM 68 223 85 42 218 53 51 204 78 51 148 35 1,256 1 0 9 15 25 4:30 PM 74 253 67 28 224 50 49 193 76 60 149 34 1,257 1 1 10 12 24 4:45 PM 66 244 89 32 236 40 62 194 94 55 148 39 1,299 0 2 6 12 20 5:00 PM 82 282 77 32 250 53 49 206 87 69 143 28 1,358 2 0 5 12 19 5:15 PM 77 268 84 35 207 42 69 263 81 52 148 38 1,364 0 2 11 19 32 5:30 PM 88 280 91 33 204 72 58 215 93 54 134 36 1,358 0 1 10 13 24 5:45 PM 77 225 74 31 203 52 59 176 84 58 151 35 1,225 1 3 5 16 25 VOLUMES 605 2,034 653 258 1,730 404 453 1,637 661 453 1,167 283 10,529 5 9 67 110 191 APPROACH % 18% 62% 20% 11% 72% 17% 16% 58% 23% 23% 58% 14% APP/DEPART 3,297 / 2,779 2,401 / 2,849 2,818 / 2,658 2,013 / 2,243 0

BEGIN PEAK HR
VOLUMES 313 1,074 341 132 897 207 238 878 355 230 573 141 5,474 2 5 32 56 APPROACH % 18% 62% 20% 11% 72% 17% 16% 58% 24% 23% 57% 14% PEAK HR FACTOR 0.942 0.926 0.886 0.973 0.980
APP/DEPART 1,730 / 1,458 1,241 / 1,484 1,503 / 1,407 1,000 / 1,125 0 Calloway Dr

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Calloway Dr

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 1 2 3 0 0 0 1 1 0 0 1 1 2
7:30 AM 0 2 0 1 3 0 2 0 0 2 0 0 0 1 1
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 1 0 1 0 0 1 0 1 0 0 0 0 0
8:30 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1
8:45 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
TOTAL 0 3 2 4 9 0 3 1 1 5 0 0 1 3 4
4:00 PM 2 1 0 6 9 2 1 0 6 9 0 0 0 0 0
4:15 PM 1 0 0 2 3 1 0 0 1 2 0 0 0 1 1
4:30 PM 0 1 2 1 4 0 1 2 1 4 0 0 0 0 0
4:45 PM 5 1 0 1 7 2 0 0 1 3 3 1 0 0 4
5:00 PM 0 1 3 1 5 0 0 1 0 1 0 1 2 1 4
5:15 PM 0 0 3 4 7 0 0 0 1 1 0 0 3 3 6
5:30 PM 0 0 1 0 1 0 0 1 0 1 0 0 0 0 0
5:45 PM 5 1 2 3 11 2 0 1 0 3 3 1 1 3 8
TOTAL 13 5 11 18 47 7 2 5 10 24 6 3 6 8 23

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Calloway Dr
Rosedale Hwy

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
[ ]
[ ]
4,585 830 3,337 406 TOTAL 4,291
2,401 404 1,730 258 PM 2,779
2,184 426 1,607 148 AM 1,512 1,892 2,013 3,905 4,260 2,243 2,017 170 283 453 1,178 1,167 2,345 TOTAL PMAM498 453 951 678 453 225 AMPM TOTAL 2,442 1,637 805 934 661 273 1,323 2,658 3,981 4,164 2,818 1,346 2,396 AM 370 1,114 324 1,826
2,849 PM 605 2,034 653 3,297
5,245 TOTAL 975 3,148 977 5,123
2,485 457 1,806 216 TOTAL 2,295
1,241 207 897 132 PM 1,458
1,244 250 909 84 AM 837 1,061 1,000 2,061 2,287 1,125 1,162 97 141 238 655 573 1,228 TOTAL PMAMAM 7:30 AM 8:45 AM 281 230 511 360 238 122
#N/A AMPM TOTAL 1,291 878 413 PM 4:45 PM
3:45 PM 495 355 140 701 1,407 2,108 2,210 1,503 707
1,346 AM 225 617 176 1,034
1,484 PM 313 1,074 341 1,730
2,830 Total 538 1,691 517 2,764
Calloway Dr
AimTD LLC

TURNING MOVEMENT COUNTS
Calloway Dr Rosedale HwyRosedale Hwy ALL HOURS
Calloway Dr
Calloway Dr Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC4983
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 30 128 39 18 183 29 18 87 34 61 131 20 776 0
7:15 AM 39 124 26 19 180 44 24 108 31 68 160 15 835 0
7:30 AM 46 160 43 17 246 54 26 116 41 86 185 30 1,046 0 7:45 AM 75 200 55 28 264 68 35 127 45 71 191 29 1,185 0 8:00 AM 67 166 57 24 230 65 26 139 35 75 192 20 1,094 0 8:15 AM 52 138 46 23 201 69 41 104 39 75 180 31 996 0
8:30 AM 38 142 49 27 203 53 35 145 49 62 162 27 989 0
8:45 AM 49 138 52 14 173 56 34 120 34 48 144 25 885 0
VOLUMES 394 1,195 365 169 1,677 436 237 944 306 544 1,344 197 7,805 0 0 0 0 0 APPROACH % 20% 61% 19% 7% 73% 19% 16% 64% 21% 26% 64% 9% APP/DEPART 1,954 / 1,628 2,282 / 2,526 1,486 / 1,478 2,084 / 2,174 0

BEGIN PEAK HR
VOLUMES 239 664 200 92 940 255 127 485 159 306 747 110 4,320 APPROACH % 22% 60% 18% 7% 73% 20% 16% 63% 21% 26% 64% 9% PEAK HR FACTOR 0.837 0.895 0.933 0.968 0.911
APP/DEPART 1,102 / 900 1,286 / 1,404 771 / 776 1,162 / 1,241 0 4:00 PM 76 266 86 26 194 43 57 193 73 56 155 42 1,264 0 4:15 PM 70 227 86 45 230 55 52 211 81 54 158 36 1,302 0 4:30 PM 77 260 68 30 229 53 49 209 79 63 153 36 1,303 0 4:45 PM 67 246 92 33 241 43 64 202 94 58 157 41 1,336 0 5:00 PM 85 286 80 34 255 55 50 213 90 69 147 30 1,391 0 5:15 PM 77 276 86 39 208 43 71 274 83 52 155 38 1,398 0 5:30 PM 92 282 93 36 207 72 59 222 94 56 145 37 1,392 0 5:45 PM 80 229 75 31 209 52 59 180 84 58 153 38 1,246 0 VOLUMES 621 2,070 664 272 1,772 413 460 1,702 678 465 1,221 295 10,631 0 0 0 0 0 APPROACH % 19% 62% 20% 11% 72% 17% 16% 60% 24% 23% 62% 15% APP/DEPART 3,354 / 2,825 2,457 / 2,915 2,840 / 2,637 1,981 / 2,255 0

BEGIN PEAK HR
VOLUMES 320 1,089 350 141 911 212 243 910 361 235 603 145 5,516 APPROACH % 18% 62% 20% 11% 72% 17% 16% 60% 24% 24% 61% 15% PEAK HR FACTOR 0.944 0.919 0.886 0.961 0.986
APP/DEPART 1,758 / 1,477 1,263 / 1,506 1,514 / 1,400 982 / 1,134 0 Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 22 102 26 13 151 26 16 57 19 50 92 14 588 1 0 2 1 4 7:15 AM 29 103 24 13 170 37 22 71 24 60 119 6 678 0 2 1 4 7 7:30 AM 38 121 23 17 229 49 21 67 34 67 138 21 825 3 0 13 3 19 7:45 AM 65 180 45 23 243 68 32 97 36 60 154 21 1,024 9 1 13 7 30 8:00 AM 61 143 44 11 214 61 23 97 23 68 143 15 903 1 0 1 12 14 8:15 AM 46 124 33 23 188 67 39 75 28 64 121 25 833 3 0 2 5 10 8:30 AM 36 130 44 16 186 50 33 109 45 42 113 16 820 0 0 3 5 8 8:45 AM 44 120 40 9 147 56 24 85 31 45 111 16 728 1 0 4 7 12 VOLUMES 341 1,023 279 125 1,528 414 210 658 240 456 991 134 6,503 18 3 39 44 104 APPROACH % 21% 62% 17% 6% 74% 20% 18% 57% 21% 28% 61% 8% APP/DEPART 1,661 / 1,370 2,070 / 2,242 1,147 / 1,106 1,625 / 1,785 0

BEGIN PEAK HR
VOLUMES 210 568 145 74 874 245 115 336 121 259 556 82 3,658 16 1 29 27 APPROACH % 22% 60% 15% 6% 73% 21% 19% 56% 20% 28% 60% 9% PEAK HR FACTOR 0.785 0.891 0.844 0.955 0.868
APP/DEPART 939 / 766 1,194 / 1,270 601 / 582 924 / 1,040 0 4:00 PM 69 247 86 24 182 41 54 179 64 50 136 35 1,167 0 0 11 10 21 4:15 PM 66 217 84 38 207 50 49 195 73 48 135 34 1,196 1 0 9 15 25 4:30 PM 72 244 66 25 217 48 49 178 72 57 143 31 1,202 1 1 10 12 24 4:45 PM 64 241 86 31 232 38 59 183 94 52 136 37 1,253 0 2 6 12 20 5:00 PM 80 275 74 29 241 50 48 197 85 69 139 25 1,312 2 0 5 12 19 5:15 PM 77 261 81 31 206 41 66 251 80 52 141 38 1,325 0 2 11 19 32 5:30 PM 84 277 88 30 201 72 56 208 92 51 123 34 1,316 0 1 10 13 24 5:45 PM 74 221 73 31 197 52 59 169 84 58 148 31 1,197 1 3 5 16 25 VOLUMES 586 1,983 638 239 1,683 392 440 1,560 644 437 1,101 265 10,158 5 9 67 109 190 APPROACH % 18% 62% 20% 10% 72% 17% 16% 58% 24% 23% 58% 14% APP/DEPART 3,212 / 2,697 2,323 / 2,769 2,711 / 2,546 1,912 / 2,146 0

BEGIN PEAK HR
VOLUMES 305 1,054 329 121 880 201 229 839 351 224 539 134 5,301 2 5 32 56 APPROACH % 18% 62% 19% 10% 73% 17% 16% 58% 24% 24% 57% 14% PEAK HR FACTOR 0.941 0.943 0.889 0.953 0.977
APP/DEPART 1,690 / 1,422 1,207 / 1,457 1,451 / 1,345 953 / 1,077 0 Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 4 6 2 1 7 2 1 10 3 3 12 2 53 0 0 0 0 0
7:15 AM 3 7 1 0 3 1 0 13 2 2 18 4 54 0 0 0 0 0
7:30 AM 1 8 3 0 6 1 3 17 1 1 13 4 58 0 0 0 0 0
7:45 AM 3 5 4 3 3 0 2 10 1 4 16 3 54 0 0 0 0 0
8:00 AM 2 8 5 4 7 1 0 6 3 1 18 2 57 0 0 1 0 1
8:15 AM 4 6 7 0 1 1 1 11 4 1 13 2 51 0 0 2 1 3
8:30 AM 1 6 2 4 3 2 1 11 1 5 16 6 58 0 0 1 1 2
8:45 AM 2 9 0 2 9 0 3 5 0 2 10 6 48 0 0 0 0 0
VOLUMES 20 55 24 14 39 8 11 83 15 19 116 29 439 0 0 4 2 6 APPROACH % 20% 56% 24% 23% 64% 13% 10% 73% 13% 11% 70% 17% APP/DEPART 99 / 95 61 / 73 113 / 123 166 / 148 0

BEGIN PEAK HR
VOLUMES 10 27 19 7 17 3 6 44 9 7 60 11 224 0 0 3 1
APPROACH % 18% 48% 34% 26% 63% 11% 10% 71% 15% 9% 76% 14% PEAK HR FACTOR 0.824 0.563 0.738 0.859 0.966
APP/DEPART 56 / 44 27 / 33 62 / 71 79 / 76 0
4:00 PM 3 10 0 0 3 1 2 3 2 4 7 1 36 0 0 0 1 1
4:15 PM 1 4 1 3 4 3 2 6 4 1 9 1 39 0 0 0 0 0
4:30 PM 1 5 0 3 4 1 0 5 2 2 4 3 30 0 0 0 0 0
4:45 PM 2 3 1 1 2 1 2 8 0 2 8 1 31 0 0 0 0 0
5:00 PM 1 6 2 2 8 3 1 5 1 0 3 3 35 0 0 0 0 0
5:15 PM 0 3 3 3 1 1 3 7 0 0 3 0 24 0 0 0 0 0
5:30 PM 1 3 3 1 2 0 2 4 0 3 7 2 28 0 0 0 0 0
5:45 PM 1 3 1 0 4 0 0 6 0 0 2 3 20 0 0 0 0 0
VOLUMES 10 37 11 13 28 10 12 44 9 12 43 14 244 0 0 0 1 1 APPROACH % 17% 64% 19% 25% 55% 20% 18% 68% 14% 17% 61% 20% APP/DEPART 58 / 63 51 / 49 65 / 69 70 / 63 0

BEGIN PEAK HR
VOLUMES 4 15 9 7 13 5 8 24 1 5 21 6 118 0 0 0 0
APPROACH % 14% 54% 32% 28% 52% 20% 24% 73% 3% 16% 66% 19% PEAK HR FACTOR 0.778 0.481 0.825 0.667 0.843
APP/DEPART 28 / 29 25 / 19 33 / 40 32 / 30 0
Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 1 2 0 0 5 0 0 3 0 0 5 0 16 0 0 0 0 0
7:15 AM 1 2 0 0 1 0 1 1 0 1 0 0 7 0 0 0 0 0
7:30 AM 0 3 1 0 1 0 0 3 1 0 9 0 18 0 0 0 0 0
7:45 AM 1 2 1 0 2 0 0 2 0 0 2 0 10 0 0 0 0 0
8:00 AM 0 1 0 2 1 1 0 2 2 1 2 1 13 0 0 0 0 0
8:15 AM 0 1 1 0 3 0 0 5 1 2 1 0 14 0 0 0 0 0
8:30 AM 0 0 0 1 2 0 0 2 0 0 7 0 12 0 0 0 0 0
8:45 AM 1 2 0 1 2 0 1 6 0 0 3 0 16 0 0 0 0 0
VOLUMES 4 13 3 4 17 1 2 24 4 4 29 1 106 0 0 0 0 0
APPROACH % 20% 65% 15% 18% 77% 5% 7% 80% 13% 12% 85% 3% APP/DEPART 20 / 16 22 / 25 30 / 31 34 / 34 0

BEGIN PEAK HR
VOLUMES 1 7 3 2 7 1 0 12 4 3 14 1 55 0 0 0 0
APPROACH % 9% 64% 27% 20% 70% 10% 0% 75% 25% 17% 78% 6% PEAK HR FACTOR 0.688 0.625 0.667 0.500 0.764
APP/DEPART 11 / 8 10 / 14 16 / 17 18 / 16 0
4:00 PM 1 2 0 1 1 0 0 2 0 0 1 1 9 0 0 0 0 0
4:15 PM 1 2 0 1 3 0 0 1 1 1 1 0 11 0 0 0 0 0
4:30 PM 0 3 0 0 3 0 0 5 2 0 2 0 15 0 0 0 0 0
4:45 PM 0 0 1 0 0 0 1 1 0 0 2 1 6 0 0 0 0 0
5:00 PM 0 1 0 1 1 0 0 3 0 0 0 0 6 0 0 0 0 0
5:15 PM 0 2 0 0 0 0 0 2 0 0 2 0 6 0 0 0 0 0
5:30 PM 3 0 0 2 0 0 0 1 1 0 1 0 8 0 0 0 0 0
5:45 PM 2 0 0 0 0 0 0 1 0 0 1 1 5 0 0 0 0 0
VOLUMES 7 10 1 5 8 0 1 16 4 1 10 3 66 0 0 0 0 0
APPROACH % 39% 56% 6% 38% 62% 0% 5% 76% 19% 7% 71% 21%
APP/DEPART 18 / 14 13 / 13 21 / 22 14 / 17 0

BEGIN PEAK HR
VOLUMES 3 3 1 3 1 0 1 7 1 0 5 1 26 0 0 0 0
APPROACH % 43% 43% 14% 75% 25% 0% 11% 78% 11% 0% 83% 17% PEAK HR FACTOR 0.583 0.500 0.750 0.500 0.813
APP/DEPART 7 / 5 4 / 2 9 / 11 6 / 8 0
Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 0 3 2 1 1 0 0 3 2 2 3 1 18 0 0 0 0 0
7:15 AM 1 2 0 2 1 1 0 5 0 1 4 1 18 0 0 0 0 0
7:30 AM 2 5 1 0 0 1 0 5 1 3 3 1 22 0 0 0 0 0
7:45 AM 1 2 0 0 2 0 0 3 1 1 3 1 14 0 0 0 0 0
8:00 AM 1 3 1 1 1 0 1 9 1 1 6 0 25 0 0 0 0 0
8:15 AM 0 1 0 0 1 0 0 0 1 1 11 1 16 0 0 0 0 0
8:30 AM 0 1 0 1 2 0 0 3 0 4 3 0 14 0 0 0 0 0
8:45 AM 0 0 4 0 2 0 1 5 1 0 4 0 17 0 0 0 0 0
VOLUMES 5 17 8 5 10 2 2 33 7 13 37 5 144 0 0 0 0 0
APPROACH % 17% 57% 27% 29% 59% 12% 5% 79% 17% 24% 67% 9% APP/DEPART 30 / 24 17 / 30 42 / 46 55 / 44 0

BEGIN PEAK HR
VOLUMES 4 11 2 1 4 1 1 17 4 6 23 3 77 0 0 0 0
APPROACH % 24% 65% 12% 17% 67% 17% 5% 77% 18% 19% 72% 9% PEAK HR FACTOR 0.531 0.750 0.500 0.615 0.770
APP/DEPART 17 / 15 6 / 14 22 / 20 32 / 28 0
4:00 PM 0 0 0 0 1 0 0 1 2 0 2 1 7 0 0 0 0 0
4:15 PM 0 0 0 0 3 0 0 1 0 0 1 0 5 0 0 0 0 0
4:30 PM 1 0 0 0 0 1 0 3 0 1 0 0 6 0 0 0 0 0
4:45 PM 0 0 0 0 2 1 0 1 0 1 1 0 6 0 0 0 0 0
5:00 PM 1 0 1 0 0 0 0 0 1 0 1 0 4 0 0 0 0 0
5:15 PM 0 2 0 1 0 0 0 2 1 0 1 0 7 0 0 0 0 0
5:30 PM 0 0 0 0 1 0 0 2 0 0 3 0 6 0 0 0 0 0
5:45 PM 0 1 0 0 2 0 0 0 0 0 0 0 3 0 0 0 0 0
VOLUMES 2 3 1 1 9 2 0 10 4 2 9 1 44 0 0 0 0 0
APPROACH % 33% 50% 17% 8% 75% 17% 0% 71% 29% 17% 75% 8% APP/DEPART 6 / 4 12 / 15 14 / 12 12 / 13 0

BEGIN PEAK HR
VOLUMES 1 2 1 1 3 1 0 5 2 1 6 0 23 0 0 0 0
APPROACH % 25% 50% 25% 20% 60% 20% 0% 71% 29% 14% 86% 0% PEAK HR FACTOR 0.500 0.417 0.583 0.583 0.821
APP/DEPART 4 / 2 5 / 6 7 / 7 7 / 8 0
Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 1 / 1 1 / 1 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 1 / 1 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.250 0.250
APP/DEPART 0 / 0 0 / 0 0 / 0 1 / 1 0
Calloway Dr

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Calloway Dr LOCATION #: 5
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 2 1 2 3 1 2 3 1
7:00 AM 0 2 2 0 4 0 0 0 2 0 1 0 11 0 0 0 0 0
7:15 AM 0 0 0 0 0 1 0 0 2 0 1 0 4 0 0 0 0 0
7:30 AM 0 3 5 0 3 0 0 1 0 4 0 0 16 0 0 0 0 0
7:45 AM 0 1 1 0 3 0 0 1 2 1 0 0 9 0 0 0 0 0
8:00 AM 0 0 1 0 0 0 0 1 0 0 0 0 2 0 0 0 0 0
8:15 AM 0 0 0 0 1 0 0 1 0 1 2 0 5 0 0 0 0 0
8:30 AM 0 0 1 0 1 0 0 2 1 0 0 1 6 0 0 0 0 0
8:45 AM 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 6 10 0 13 1 0 6 7 6 4 1 54 0 0 0 0 0
APPROACH % 0% 38% 63% 0% 93% 7% 0% 46% 54% 55% 36% 9%
APP/DEPART 16 / 7 14 / 26 13 / 16 11 / 5 0

BEGIN PEAK HR
VOLUMES 0 4 7 0 7 0 0 4 2 6 2 0 32 0 0 0 0
APPROACH % 0% 36% 64% 0% 100% 0% 0% 67% 33% 75% 25% 0%
PEAK HR FACTOR 0.344 0.583 0.500 0.500 0.500
APP/DEPART 11 / 4 7 / 15 6 / 11 8 / 2 0
4:00 PM 0 0 0 0 1 0 0 1 0 0 0 0 2 0 0 0 0 0
4:15 PM 0 0 0 0 1 0 0 1 0 1 2 0 5 0 0 0 0 0
4:30 PM 0 1 1 0 0 0 0 2 0 0 0 0 4 0 0 0 0 0
4:45 PM 0 0 1 0 0 0 0 1 0 0 0 0 2 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 1 2 0 2 0 0 7 0 1 3 0 16 0 0 0 0 0
APPROACH % 0% 33% 67% 0% 100% 0% 0% 100% 0% 25% 75% 0%
APP/DEPART 3 / 1 2 / 3 7 / 9 4 / 3 0

BEGIN PEAK HR
VOLUMES 0 0 1 0 0 0 0 3 0 0 1 0 5 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.250 0.000 0.750 0.250 0.625
APP/DEPART 1 / 0 0 / 0 3 / 4 1 / 1 0
Calloway Dr

NORTH SIDE
Rosedale HwyWEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Rosedale Hwy Rosedale Hwy
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 6
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1 0 0 0 0
7:00 AM 4 4 2 81 9 16 14 106 1 2 75 12 326 0 0 0 0 0
7:15 AM 9 5 3 95 7 14 7 128 3 3 72 13 359 0 0 0 1 1
7:30 AM 11 13 7 101 26 21 15 138 6 1 87 16 442 0 0 0 0 0 7:45 AM 11 5 8 87 25 30 17 182 4 8 113 19 509 0 0 2 2 4 8:00 AM 13 4 6 75 18 18 24 156 7 3 110 28 462 0 0 2 5 7 8:15 AM 13 5 8 60 8 24 18 169 2 6 133 17 463 0 0 2 1 3
8:30 AM 2 3 12 57 6 12 10 158 5 5 120 15 405 0 0 0 2 2
8:45 AM 9 5 3 38 4 9 13 132 6 4 111 23 357 0 0 0 4 4
VOLUMES 72 44 49 594 103 144 118 1,169 34 32 821 143 3,344 0 0 6 15 21 APPROACH % 44% 27% 30% 71% 12% 17% 9% 88% 3% 3% 81% 14% APP/DEPART 165 / 305 841 / 169 1,327 / 1,827 1,011 / 1,043 0

BEGIN PEAK HR
VOLUMES 48 27 29 323 77 93 74 645 19 18 443 80 1,890 0 0 6 8 APPROACH % 46% 26% 28% 66% 16% 19% 10% 87% 3% 3% 81% 15% PEAK HR FACTOR 0.839 0.833 0.907 0.874 0.921
APP/DEPART 104 / 181 493 / 114 744 / 1,005 549 / 590 0
4:00 PM 14 5 5 48 8 21 19 191 5 3 237 57 613 0 0 1 2 3
4:15 PM 9 4 8 46 9 18 20 185 7 8 228 60 602 0 0 0 5 5
4:30 PM 11 7 8 32 11 22 22 156 5 7 258 57 596 0 0 1 2 3 4:45 PM 12 12 6 42 10 27 26 175 5 3 228 75 621 0 0 0 4 4 5:00 PM 11 9 7 42 7 27 27 179 3 2 250 67 631 0 0 2 3 5
5:15 PM 13 9 5 61 17 34 28 175 4 8 234 69 657 0 0 2 1 3 5:30 PM 7 5 6 61 4 27 27 169 4 7 217 54 588 0 0 2 4 6
5:45 PM 6 9 5 45 5 29 24 174 5 4 214 67 587 0 0 0 1 1
VOLUMES 83 60 50 377 71 205 193 1,404 38 42 1,866 506 4,925 0 0 8 22 30 APPROACH % 43% 31% 26% 58% 11% 31% 12% 85% 2% 2% 77% 21% APP/DEPART 193 / 759 653 / 151 1,643 / 1,853 2,436 / 2,162 0

BEGIN PEAK HR
VOLUMES 47 37 26 177 45 110 103 685 17 20 970 268 2,520 0 0 5 10 APPROACH % 43% 34% 24% 53% 14% 33% 13% 85% 2% 2% 76% 21% PEAK HR FACTOR 0.917 0.741 0.960 0.978 0.955
APP/DEPART 110 / 408 332 / 82 810 / 898 1,268 / 1,132 0 Verdugo Ln

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Verdugo Ln

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 1 1 0 0 0 1 1 0 0 0 0 0
7:15 AM 4 0 1 1 6 4 0 0 1 5 0 0 1 0 1
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 1 4 0 1 6 1 4 0 1 6 0 0 0 0 0
8:00 AM 0 0 0 2 2 0 0 0 2 2 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 5 5 1 5 16 5 5 0 5 15 0 0 1 0 1
4:00 PM 2 1 0 0 3 2 1 0 0 3 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 1 0 0 1 2 0 0 0 0 0 1 0 0 1 2
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 3 1 1 1 6 2 1 0 0 3 1 0 1 1 3

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:30 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Verdugo Ln
Rosedale Hwy

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
[ ]
[ ]
1,494 349 174 971 TOTAL 1,064
653 205 71 377 PM 759
841 144 103 594 AM 305 1,011 2,436 3,447 3,205 2,162 1,043 143 506 649 821 1,866 2,687 TOTAL PMAM32 42 74 311 193 118 AMPM TOTAL 2,573 1,404 1,169 72 38 34 1,827 1,853 3,680 2,970 1,643 1,327 169 AM 72 44 49 165
151 PM 83 60 50 193
320 TOTAL 155 104 99 358
825 203 122 500 TOTAL 589
332 110 45 177 PM 408
493 93 77 323 AM 181 549 1,268 1,817 1,722 1,132 590 80 268 348 443 970 1,413 TOTAL PMAMAM 7:30 AM 8:45 AM 18 20 38 177 103 74
#N/A AMPM TOTAL 1,330 685 645 PM 4:30 PM
3:45 PM 36 17 19 1,005 898 1,903 1,554 810 744
114 AM 48 27 29 104
82 PM 47 37 26 110
196 Total 95 64 55 214
Verdugo Ln
AimTD LLC

TURNING MOVEMENT COUNTS
Verdugo Ln Rosedale HwyRosedale Hwy ALL HOURS
Verdugo Ln
Verdugo Ln Rosedale HwyRosedale Hwy

PEAK HOUR
Bakersfield
SC5147
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 4 5 2 90 9 19 17 118 1 3 92 16 374 0
7:15 AM 11 6 4 99 8 16 8 145 5 3 84 16 402 0
7:30 AM 14 14 8 105 26 23 15 155 7 1 106 18 490 0
7:45 AM 12 5 10 90 25 31 19 189 4 9 128 23 541 0
8:00 AM 13 4 8 79 18 18 28 165 7 3 128 33 503 0
8:15 AM 13 5 9 65 8 27 19 181 3 7 157 18 511 0
8:30 AM 2 3 15 59 7 14 10 174 6 5 138 16 446 0
8:45 AM 9 5 3 44 4 10 15 139 6 4 128 28 394 0
VOLUMES 78 46 58 629 105 156 128 1,264 37 34 960 165 3,658 0 0 0 0 0 APPROACH % 43% 25% 32% 71% 12% 18% 9% 88% 3% 3% 83% 14% APP/DEPART 181 / 339 890 / 176 1,429 / 1,950 1,159 / 1,194 0

BEGIN PEAK HR
VOLUMES 52 28 34 338 77 99 80 689 20 20 519 91 2,044
APPROACH % 46% 24% 30% 66% 15% 19% 10% 87% 3% 3% 82% 14% PEAK HR FACTOR 0.799 0.836 0.934 0.866 0.944
APP/DEPART 114 / 198 514 / 117 788 / 1,061 629 / 669 0
4:00 PM 14 5 5 51 8 24 20 200 6 3 248 58 639 0
4:15 PM 9 4 8 47 10 20 23 194 8 8 237 62 628 0
4:30 PM 11 7 8 33 11 24 26 168 6 8 273 58 632 0
4:45 PM 12 13 7 43 10 28 27 196 6 3 237 79 659 0
5:00 PM 11 9 8 42 7 27 31 189 3 2 258 71 657 0
5:15 PM 13 9 5 62 18 35 28 192 5 9 240 70 684 0
5:30 PM 7 7 6 66 4 30 30 178 4 7 227 54 619 0
5:45 PM 6 9 5 47 5 30 28 178 6 4 218 72 606 0
VOLUMES 83 63 52 389 73 217 211 1,493 43 43 1,936 522 5,122 0 0 0 0 0 APPROACH % 42% 32% 26% 57% 11% 32% 12% 86% 2% 2% 77% 21% APP/DEPART 197 / 795 678 / 158 1,746 / 1,933 2,501 / 2,236 0

BEGIN PEAK HR
VOLUMES 47 38 28 179 46 114 111 745 20 21 1,007 278 2,631 APPROACH % 42% 33% 25% 53% 13% 34% 13% 85% 2% 2% 77% 21% PEAK HR FACTOR 0.903 0.741 0.956 0.964 0.962
APP/DEPART 112 / 426 338 / 87 876 / 951 1,306 / 1,168 0 Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 4 2 2 72 9 12 12 96 1 1 55 9 275 0 0 0 0 0
7:15 AM 7 4 2 88 6 12 6 114 1 3 60 10 313 0 0 0 1 1
7:30 AM 8 12 6 95 26 19 15 117 5 1 64 13 381 0 0 0 0 0
7:45 AM 10 5 6 83 25 29 15 172 4 7 95 15 466 0 0 2 2 4
8:00 AM 13 4 3 73 18 18 21 148 7 3 90 23 421 0 0 2 5 7
8:15 AM 13 5 7 54 8 20 17 157 1 5 107 16 410 0 0 2 1 3
8:30 AM 2 3 10 55 5 9 10 139 4 5 96 14 352 0 0 0 2 2
8:45 AM 9 5 3 30 4 8 11 121 6 4 89 18 308 0 0 0 4 4
VOLUMES 66 40 39 550 101 127 107 1,064 29 29 656 118 2,947 0 0 6 15 21 APPROACH % 46% 28% 27% 71% 13% 16% 9% 88% 2% 4% 80% 14% APP/DEPART 145 / 265 778 / 159 1,206 / 1,668 818 / 855 0

BEGIN PEAK HR
VOLUMES 44 26 22 305 77 86 68 594 17 16 356 67 1,692 0 0 6 8 APPROACH % 48% 28% 24% 65% 16% 18% 10% 87% 2% 4% 80% 15% PEAK HR FACTOR 0.885 0.836 0.887 0.866 0.900
APP/DEPART 92 / 161 468 / 110 685 / 929 447 / 492 0
4:00 PM 14 5 5 44 8 18 18 179 4 3 223 56 577 0 0 1 2 3
4:15 PM 9 4 8 45 8 15 17 175 6 8 214 58 567 0 0 0 5 5
4:30 PM 11 7 8 30 11 21 16 147 4 6 240 55 556 0 0 1 2 3 4:45 PM 12 11 5 41 10 26 25 157 4 3 218 70 582 0 0 0 4 4 5:00 PM 11 9 6 42 7 27 24 167 3 2 240 63 601 0 0 2 3 5
5:15 PM 13 9 5 60 16 32 28 158 3 7 227 68 626 0 0 1 1 2 5:30 PM 7 4 6 58 4 25 25 159 4 7 209 54 562 0 0 2 4 6
5:45 PM 6 9 5 43 5 27 21 170 4 4 207 62 563 0 0 0 1 1
VOLUMES 83 58 48 363 69 191 174 1,312 32 40 1,778 486 4,663 0 0 7 22 29 APPROACH % 44% 31% 25% 58% 11% 31% 11% 86% 2% 2% 76% 21% APP/DEPART 189 / 718 623 / 141 1,525 / 1,745 2,326 / 2,059 0

BEGIN PEAK HR
VOLUMES 47 36 24 173 44 106 93 629 14 18 925 256 2,379 0 0 4 10 APPROACH % 44% 34% 22% 54% 14% 33% 13% 85% 2% 1% 77% 21% PEAK HR FACTOR 0.955 0.748 0.944 0.981 0.947
APP/DEPART 107 / 385 323 / 76 740 / 836 1,209 / 1,082 0 Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 0 2 0 4 0 3 1 3 0 1 14 1 29 0 0 0 0 0
7:15 AM 1 1 0 7 0 1 1 6 1 0 6 1 25 0 0 0 0 0
7:30 AM 0 1 0 5 0 0 0 15 1 0 16 3 41 0 0 0 0 0
7:45 AM 0 0 1 3 0 1 1 9 0 1 13 3 32 0 0 0 0 0
8:00 AM 0 0 3 0 0 0 1 3 0 0 12 2 21 0 0 0 0 0
8:15 AM 0 0 0 4 0 2 1 6 1 0 14 1 29 0 0 0 0 0
8:30 AM 0 0 1 1 1 3 0 13 1 0 18 1 39 0 0 0 0 0
8:45 AM 0 0 0 6 0 0 1 10 0 0 15 3 35 0 0 0 0 0
VOLUMES 1 4 5 30 1 10 6 65 4 2 108 15 251 0 0 0 0 0
APPROACH % 10% 40% 50% 73% 2% 24% 8% 87% 5% 2% 86% 12%
APP/DEPART 10 / 25 41 / 7 75 / 100 125 / 119 0

BEGIN PEAK HR
VOLUMES 0 1 4 12 0 3 3 33 2 1 55 9 123 0 0 0 0
APPROACH % 0% 20% 80% 80% 0% 20% 8% 87% 5% 2% 85% 14%
PEAK HR FACTOR 0.417 0.625 0.594 0.855 0.750
APP/DEPART 5 / 13 15 / 3 38 / 49 65 / 58 0
4:00 PM 0 0 0 3 0 2 1 9 1 0 11 1 28 0 0 0 0 0
4:15 PM 0 0 0 0 0 3 1 6 1 0 13 1 25 0 0 0 0 0
4:30 PM 0 0 0 2 0 0 5 4 0 1 10 2 24 0 0 0 0 0
4:45 PM 0 1 1 1 0 1 0 6 0 0 7 4 21 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 1 7 0 0 8 2 18 0 0 0 0 0
5:15 PM 0 0 0 1 1 2 0 8 0 1 5 1 19 0 0 0 0 0
5:30 PM 0 0 0 1 0 0 0 7 0 0 3 0 11 0 0 0 0 0
5:45 PM 0 0 0 1 0 2 1 3 1 0 6 3 17 0 0 0 0 0
VOLUMES 0 1 1 9 1 10 9 50 3 2 63 14 163 0 0 0 0 0
APPROACH % 0% 50% 50% 45% 5% 50% 15% 81% 5% 3% 80% 18%
APP/DEPART 2 / 24 20 / 6 62 / 60 79 / 73 0

BEGIN PEAK HR
VOLUMES 0 1 1 4 1 3 6 25 0 2 30 9 82 0 0 0 0
APPROACH % 0% 50% 50% 50% 13% 38% 19% 81% 0% 5% 73% 22% PEAK HR FACTOR 0.250 0.500 0.861 0.788 0.854
APP/DEPART 2 / 16 8 / 3 31 / 30 41 / 33 0
Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 0 0 0 3 0 0 0 4 0 0 1 1 9 0 0 0 0 0
7:15 AM 1 0 0 0 0 1 0 2 0 0 2 1 7 0 0 0 0 0
7:30 AM 3 0 0 1 0 1 0 1 0 0 2 0 8 0 0 0 0 0
7:45 AM 1 0 0 1 0 0 0 0 0 0 2 0 4 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 1 3 0 0 4 2 10 0 0 0 0 0
8:15 AM 0 0 1 1 0 1 0 1 0 1 6 0 11 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
8:45 AM 0 0 0 1 0 1 1 0 0 0 5 1 9 0 0 0 0 0
VOLUMES 5 0 1 7 0 4 2 13 0 1 23 5 61 0 0 0 0 0
APPROACH % 83% 0% 17% 64% 0% 36% 13% 87% 0% 3% 79% 17%
APP/DEPART 6 / 7 11 / 1 15 / 21 29 / 32 0

BEGIN PEAK HR
VOLUMES 4 0 1 3 0 2 1 5 0 1 14 2 33 0 0 0 0
APPROACH % 80% 0% 20% 60% 0% 40% 17% 83% 0% 6% 82% 12%
PEAK HR FACTOR 0.417 0.625 0.375 0.607 0.750
APP/DEPART 5 / 3 5 / 1 6 / 9 17 / 20 0
4:00 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
4:15 PM 0 0 0 1 1 0 2 1 0 0 0 0 5 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 1 0 1 0 5 0 7 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 1 4 1 0 0 0 6 0 0 0 0 0
5:00 PM 0 0 1 0 0 0 1 4 0 0 0 1 7 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 1 1 0 1 0 3 0 0 1 0 1
5:30 PM 0 0 0 0 0 1 1 1 0 0 0 0 3 0 0 0 0 0
5:45 PM 0 0 0 1 0 0 1 0 0 0 1 1 4 0 0 0 0 0
VOLUMES 0 0 1 2 1 1 7 13 3 0 8 2 39 0 0 1 0 1
APPROACH % 0% 0% 100% 50% 25% 25% 29% 54% 13% 0% 80% 20% APP/DEPART 1 / 9 4 / 4 24 / 16 10 / 10 0

BEGIN PEAK HR
VOLUMES 0 0 1 0 0 0 3 9 3 0 6 1 24 0 0 1 0
APPROACH % 0% 0% 100% 0% 0% 0% 19% 56% 19% 0% 86% 14%
PEAK HR FACTOR 0.250 0.000 0.667 0.350 0.857
APP/DEPART 1 / 4 0 / 3 16 / 10 7 / 7 0
Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 0 0 0 2 0 0 1 3 0 0 4 1 11 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 6 0 0 3 0 9 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 3 0 0 4 0 7 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 1 0 0 3 1 5 0 0 0 0 0
8:00 AM 0 0 0 2 0 0 1 2 0 0 4 1 10 0 0 0 0 0
8:15 AM 0 0 0 1 0 0 0 3 0 0 5 0 9 0 0 0 0 0
8:30 AM 0 0 1 0 0 0 0 3 0 0 3 0 7 0 0 0 0 0
8:45 AM 0 0 0 1 0 0 0 1 0 0 2 1 5 0 0 0 0 0
VOLUMES 0 0 1 6 0 0 2 22 0 0 28 4 63 0 0 0 0 0
APPROACH % 0% 0% 100% 100% 0% 0% 8% 92% 0% 0% 88% 13%
APP/DEPART 1 / 6 6 / 0 24 / 29 32 / 28 0

BEGIN PEAK HR
VOLUMES 0 0 0 3 0 0 1 9 0 0 16 2 31 0 0 0 0
APPROACH % 0% 0% 0% 100% 0% 0% 10% 90% 0% 0% 89% 11%
PEAK HR FACTOR 0.000 0.375 0.833 0.900 0.775
APP/DEPART 0 / 3 3 / 0 10 / 12 18 / 16 0
4:00 PM 0 0 0 0 0 1 0 1 0 0 2 0 4 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
4:30 PM 0 0 0 0 0 1 0 5 0 0 2 0 8 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 6 0 0 2 1 9 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 1 1 0 0 2 1 5 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 4 0 0 1 0 5 0 0 0 0 0
5:30 PM 0 1 0 2 0 1 1 2 0 0 3 0 10 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 1 1 0 0 0 1 3 0 0 0 0 0
VOLUMES 0 1 0 2 0 3 3 22 0 0 13 3 47 0 0 0 0 0
APPROACH % 0% 100% 0% 40% 0% 60% 12% 88% 0% 0% 81% 19%
APP/DEPART 1 / 7 5 / 0 25 / 24 16 / 16 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 1 1 16 0 0 7 2 27 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 100% 6% 94% 0% 0% 78% 22%
PEAK HR FACTOR 0.000 0.250 0.708 0.750 0.750
APP/DEPART 0 / 3 1 / 0 17 / 16 9 / 8 0
Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 1 / 1 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Verdugo Ln

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Verdugo Ln LOCATION #: 6
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 0 1 1 0 1 3 1 1 2 1
7:00 AM 0 0 0 0 0 1 0 0 0 0 1 0 2 0 0 0 0 0
7:15 AM 0 0 1 0 1 0 0 0 1 0 1 1 5 0 0 0 0 0
7:30 AM 0 0 1 0 0 1 0 2 0 0 1 0 5 0 0 0 0 0
7:45 AM 0 0 1 0 0 0 1 0 0 0 0 0 2 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 1 0 2 0 0 1 0 4 0 0 0 0 0
8:30 AM 0 0 0 1 0 0 0 1 0 0 1 0 3 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 3 1 1 3 1 5 1 0 5 1 21 0 0 0 0 0
APPROACH % 0% 0% 100% 20% 20% 60% 14% 71% 14% 0% 83% 17% APP/DEPART 3 / 2 5 / 2 7 / 9 6 / 8 0

BEGIN PEAK HR
VOLUMES 0 0 2 0 0 2 1 4 0 0 2 0 11 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 100% 20% 80% 0% 0% 100% 0%
PEAK HR FACTOR 0.500 0.500 0.625 0.500 0.550
APP/DEPART 2 / 1 2 / 0 5 / 6 2 / 4 0
4:00 PM 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 0 1 2 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 4 0 0 0 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 1 0 0 0 7 0 0 4 1 13 0 0 0 0 0
APPROACH % 0% 0% 0% 100% 0% 0% 0% 100% 0% 0% 80% 20%
APP/DEPART 0 / 1 1 / 0 7 / 8 5 / 4 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 6 0 0 2 0 8 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.000 0.375 0.500 0.500
APP/DEPART 0 / 0 0 / 0 6 / 6 2 / 2 0
Verdugo Ln

NORTH SIDE
WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Verdugo Ln AM
7:30 AM PM
4:30 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Rosedale Hwy

U-TURNS
Verdugo Ln Verdugo Ln Rosedale Hwy Rosedale Hwy
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 7
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0 0 0 0 0
7:00 AM 12 3 26 7 6 0 0 94 12 13 64 1 238 0 0 0 1 1
7:15 AM 9 1 29 11 5 3 0 103 24 26 58 1 270 0 0 0 0 0
7:30 AM 17 2 24 10 13 1 2 136 63 26 79 5 378 0 0 0 0 0
7:45 AM 44 11 62 12 19 5 2 137 83 35 90 4 504 0 0 3 1 4 8:00 AM 27 5 46 7 14 4 4 172 43 20 95 2 439 0 0 16 0 16 8:15 AM 20 3 37 6 6 1 6 143 30 26 114 6 398 0 0 20 1 21 8:30 AM 16 0 25 8 1 3 3 142 12 9 106 7 332 0 0 4 1 5
8:45 AM 13 0 20 11 2 2 2 110 15 13 89 1 278 0 0 2 1 3
VOLUMES 158 25 269 72 66 19 19 1,037 282 168 695 27 2,887 0 0 45 5 50 APPROACH % 35% 6% 60% 46% 42% 12% 1% 75% 20% 19% 78% 3% APP/DEPART 452 / 71 157 / 516 1,383 / 1,383 895 / 917 0

BEGIN PEAK HR
VOLUMES 108 21 169 35 52 11 14 588 219 107 378 17 1,760 0 0 39 2 APPROACH % 36% 7% 57% 36% 53% 11% 2% 68% 25% 21% 75% 3% PEAK HR FACTOR 0.637 0.681 0.915 0.857 0.866
APP/DEPART 298 / 52 98 / 378 860 / 794 504 / 536 0
4:00 PM 29 3 34 11 7 2 3 179 20 34 158 6 486 0 0 3 1 4
4:15 PM 39 5 30 8 2 3 4 192 21 25 169 6 504 0 0 0 2 2
4:30 PM 21 8 30 9 4 1 1 173 17 37 158 7 466 0 0 2 1 3
4:45 PM 19 5 27 6 5 0 3 180 15 34 196 1 491 0 0 1 1 2
5:00 PM 28 5 43 6 3 3 2 176 18 39 156 6 485 0 0 0 2 2
5:15 PM 27 8 36 11 3 0 5 171 25 33 189 5 513 0 0 4 7 11 5:30 PM 23 12 25 13 4 0 6 190 15 33 168 1 490 0 0 1 4 5 5:45 PM 23 5 30 9 3 3 3 158 21 40 147 2 444 0 0 0 1 1
VOLUMES 209 51 255 73 31 12 27 1,419 152 275 1,341 34 3,909 0 0 11 19 30 APPROACH % 41% 10% 50% 63% 27% 10% 2% 88% 9% 16% 80% 2% APP/DEPART 515 / 112 116 / 458 1,609 / 1,766 1,669 / 1,573 0

BEGIN PEAK HR
VOLUMES 97 30 131 36 15 3 16 717 73 139 709 13 1,999 0 0 6 14 APPROACH % 38% 12% 51% 67% 28% 6% 2% 88% 9% 16% 81% 1%
PEAK HR FACTOR 0.849 0.794 0.958 0.935 0.954
APP/DEPART 258 / 59 54 / 227 812 / 898 875 / 815 0
Old Farm Rd

NORTH LEG
Rosedale Hwy WEST LEG EAST LEG Rosedale Hwy

SOUTH LEG
Old Farm Rd

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 1 1 1 3 0 1 0 0 1 0 0 1 1 2
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 4 0 1 5 0 2 0 1 3 0 2 0 0 2
8:00 AM 0 0 0 2 2 0 0 0 1 1 0 0 0 1 1
8:15 AM 0 4 0 0 4 0 4 0 0 4 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
TOTAL 0 10 1 4 15 0 8 0 2 10 0 2 1 2 5
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 1 1 0 1 3 0 0 0 0 0 1 1 0 1 3
5:00 PM 0 1 0 1 2 0 0 0 0 0 0 1 0 1 2
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 1 2 0 2 5 0 0 0 0 0 1 2 0 2 5 AM PM AM PM
7:30 AM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS BICYCLE & SCOOTER CROSSINGS

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Old Farm Rd
Rosedale Hwy
[ ]
[ ]
273 31 97 145 TOTAL 183
116 12 31 73 PM 112
157 19 66 72 AM 71 895 1,669 2,564 2,490 1,573 917 27 34 61 695 1,341 2,036 TOTAL PMAM168 275 443 46 27 19 AMPM TOTAL 2,456 1,419 1,037 434 152 282 1,383 1,766 3,149 2,992 1,609 1,383 516 AM 158 25 269 452
458 PM 209 51 255 515
974 TOTAL 367 76 524 967
152 14 67 71 TOTAL 111
54 3 15 36 PM 59
98 11 52 35 AM 52 504 875 1,379 1,351 815 536 17 13 30 378 709 1,087 TOTAL PMAMAM 7:30 AM 8:45 AM 107 139 246 30 16 14
#N/A AMPM TOTAL 1,305 717 588 PM 4:45 PM
3:45 PM 292 73 219 794 898 1,692 1,672 812 860
378 AM 108 21 169 298
227 PM 97 30 131 258
605 Total 205 51 300 556
Old Farm Rd
AimTD LLC

TURNING MOVEMENT COUNTS
Old Farm Rd
Bakersfield
SC5147 Rosedale Hwy Rosedale Hwy Rosedale Hwy Rosedale Hwy ALL HOURS Old Farm Rd
Old Farm Rd

PEAK HOUR
I I I]] A A A
V V [ [ I I
I I I ] ] A A A
V V [
[ I I I
]]
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 13 3 26 9 6 0 0 109 13 15 84 1 278 0
7:15 AM 12 1 31 12 6 4 0 116 24 29 68 1 303 0
7:30 AM 18 4 25 11 13 2 3 151 69 26 98 6 425 0
7:45 AM 48 11 66 13 20 6 2 145 87 36 103 4 538 0
8:00 AM 29 5 48 8 16 4 7 177 43 20 108 2 466 0
8:15 AM 23 5 39 7 6 1 10 156 32 29 135 7 449 0
8:30 AM 18 0 25 9 1 4 3 152 14 11 122 9 366 0
8:45 AM 14 0 23 12 4 2 3 121 17 14 101 1 310 0
VOLUMES 173 29 282 80 71 22 28 1,126 298 179 817 31 3,133 0 0 0 0 0 APPROACH % 36% 6% 58% 46% 41% 13% 2% 78% 21% 17% 80% 3% APP/DEPART 484 / 88 172 / 547 1,451 / 1,487 1,027 / 1,011 0

BEGIN PEAK HR
VOLUMES 117 25 178 38 54 13 22 629 231 111 443 19 1,878 APPROACH % 37% 8% 56% 36% 52% 12% 2% 71% 26% 19% 77% 3% PEAK HR FACTOR 0.641 0.697 0.944 0.839 0.872
APP/DEPART 319 / 66 105 / 395 882 / 845 573 / 572 0
4:00 PM 29 3 37 11 8 2 4 188 21 34 168 7 509 0
4:15 PM 39 5 32 8 2 3 5 202 21 27 175 6 525 0
4:30 PM 25 9 34 9 4 1 1 188 19 42 169 8 508 0
4:45 PM 21 5 28 8 6 0 4 200 18 35 205 1 530 0
5:00 PM 30 5 44 6 4 3 2 192 19 41 159 6 509 0
5:15 PM 28 8 40 12 3 0 6 189 25 33 197 5 545 0
5:30 PM 24 13 26 13 4 0 6 198 15 33 176 1 508 0
5:45 PM 24 5 30 9 3 3 3 166 21 41 150 2 457 0
VOLUMES 218 53 270 76 33 12 31 1,522 158 285 1,397 36 4,088 0 0 0 0 0 APPROACH % 40% 10% 50% 63% 27% 10% 2% 89% 9% 17% 81% 2% APP/DEPART 540 / 119 121 / 476 1,710 / 1,867 1,718 / 1,627 0

BEGIN PEAK HR
VOLUMES 101 31 138 39 17 3 18 778 76 142 736 13 2,091
APPROACH % 37% 11% 51% 67% 28% 5% 2% 89% 9% 16% 83% 1%
PEAK HR FACTOR 0.860 0.860 0.984 0.925 0.959
APP/DEPART 270 / 62 59 / 234 872 / 955 890 / 840 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 10 3 26 6 6 0 0 81 11 11 45 1 200 0 0 0 1 1
7:15 AM 7 1 28 9 4 2 0 90 24 24 46 1 236 0 0 0 0 0
7:30 AM 16 0 23 8 13 0 1 117 56 26 58 3 321 0 0 0 0 0
7:45 AM 41 11 58 11 18 4 2 127 80 33 77 4 466 0 0 3 1 4 8:00 AM 24 5 45 6 12 4 1 164 43 20 80 2 406 0 0 16 0 16 8:15 AM 17 2 34 5 6 1 2 129 27 23 91 5 342 0 0 19 1 20
8:30 AM 14 0 25 7 1 2 3 128 10 8 89 4 291 0 0 4 1 5
8:45 AM 11 0 18 10 1 2 1 99 13 12 73 1 241 0 0 2 0 2
VOLUMES 140 22 257 62 61 15 10 935 264 157 559 21 2,551 0 0 44 4 48 APPROACH % 33% 5% 61% 45% 44% 11% 1% 75% 21% 21% 75% 3% APP/DEPART 419 / 53 138 / 482 1,253 / 1,258 741 / 758 0

BEGIN PEAK HR
VOLUMES 98 18 160 30 49 9 6 537 206 102 306 14 1,575 0 0 38 2 APPROACH % 36% 7% 58% 34% 56% 10% 1% 68% 26% 24% 72% 3% PEAK HR FACTOR 0.627 0.667 0.878 0.883 0.838
APP/DEPART 276 / 38 88 / 357 787 / 729 424 / 451 0
4:00 PM 29 3 30 11 6 2 2 165 19 34 146 5 452 0 0 3 1 4
4:15 PM 39 5 28 8 2 3 2 181 21 24 160 6 479 0 0 0 2 2
4:30 PM 17 7 27 9 4 1 1 159 16 31 146 6 424 0 0 1 1 2
4:45 PM 17 5 26 5 4 0 2 164 13 33 186 1 456 0 0 0 1 1
5:00 PM 25 5 42 6 2 3 2 161 17 38 151 6 458 0 0 0 2 2
5:15 PM 26 8 33 9 3 0 4 154 25 33 178 5 478 0 0 3 7 10
5:30 PM 22 11 23 13 4 0 6 182 15 33 161 1 471 0 0 1 4 5 5:45 PM 22 5 30 9 3 3 3 149 21 39 144 2 430 0 0 0 1 1
VOLUMES 197 49 239 70 28 12 22 1,315 147 265 1,272 32 3,675 0 0 8 19 27 APPROACH % 41% 10% 49% 64% 25% 11% 1% 88% 10% 17% 80% 2% APP/DEPART 485 / 103 110 / 440 1,492 / 1,643 1,588 / 1,489 0

BEGIN PEAK HR
VOLUMES 90 29 124 33 13 3 14 661 70 137 676 13 1,881 0 0 4 14 APPROACH % 37% 12% 51% 67% 27% 6% 2% 88% 9% 16% 80% 2%
PEAK HR FACTOR 0.844 0.721 0.918 0.942 0.964
APP/DEPART 243 / 56 49 / 220 749 / 832 840 / 773 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 2 0 0 0 0 0 0 5 0 1 11 0 19 0 0 0 0 0
7:15 AM 1 0 0 2 0 1 0 6 0 0 6 0 16 0 0 0 0 0
7:30 AM 1 0 0 2 0 0 0 14 2 0 11 2 32 0 0 0 0 0
7:45 AM 0 0 1 1 1 1 0 8 1 2 7 0 22 0 0 0 0 0
8:00 AM 3 0 0 0 1 0 0 6 0 0 10 0 20 0 0 0 0 0
8:15 AM 1 0 2 1 0 0 0 8 2 1 14 0 29 0 0 0 0 0
8:30 AM 1 0 0 0 0 1 0 11 1 0 11 2 27 0 0 0 0 0
8:45 AM 2 0 1 1 0 0 0 7 1 1 10 0 23 0 0 0 1 1
VOLUMES 11 0 4 7 2 3 0 65 7 5 80 4 189 0 0 0 1 1
APPROACH % 73% 0% 27% 58% 17% 25% 0% 90% 10% 6% 89% 4%
APP/DEPART 15 / 4 12 / 14 72 / 77 90 / 94 0

BEGIN PEAK HR
VOLUMES 5 0 3 4 2 1 0 36 5 3 42 2 103 0 0 0 0
APPROACH % 63% 0% 38% 57% 29% 14% 0% 88% 12% 6% 89% 4%
PEAK HR FACTOR 0.667 0.583 0.641 0.783 0.805
APP/DEPART 8 / 2 7 / 10 41 / 43 47 / 48 0
4:00 PM 0 0 3 0 1 0 1 12 1 0 9 1 28 0 0 0 0 0
4:15 PM 0 0 1 0 0 0 2 6 0 0 8 0 17 0 0 0 0 0
4:30 PM 2 1 1 0 0 0 0 7 0 4 6 0 21 0 0 1 0 1
4:45 PM 1 0 0 0 0 0 0 6 1 1 6 0 15 0 0 0 0 0
5:00 PM 3 0 0 0 1 0 0 7 1 0 5 0 17 0 0 0 0 0
5:15 PM 1 0 0 2 0 0 0 6 0 0 9 0 18 0 0 1 0 1
5:30 PM 1 0 2 0 0 0 0 5 0 0 3 0 11 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 6 0 1 2 0 9 0 0 0 0 0
VOLUMES 8 1 7 2 2 0 3 55 3 6 48 1 138 0 0 2 0 2
APPROACH % 50% 6% 44% 50% 50% 0% 5% 87% 5% 11% 87% 2%
APP/DEPART 16 / 5 4 / 11 63 / 64 55 / 58 0

BEGIN PEAK HR
VOLUMES 6 0 2 2 1 0 0 24 2 1 23 0 62 0 0 1 0
APPROACH % 75% 0% 25% 67% 33% 0% 0% 89% 7% 4% 96% 0%
PEAK HR FACTOR 0.667 0.375 0.844 0.667 0.816
APP/DEPART 8 / 0 3 / 4 27 / 28 24 / 30 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 0 0 0 0 0 0 0 4 1 0 2 0 7 0 0 0 0 0
7:15 AM 0 0 0 0 1 0 0 2 0 0 3 0 6 0 0 0 0 0
7:30 AM 0 0 1 0 0 1 0 1 1 0 6 0 10 0 0 0 0 0
7:45 AM 1 0 1 0 0 0 0 0 0 0 3 0 5 0 0 0 0 0
8:00 AM 0 0 0 1 1 0 0 2 0 0 2 0 6 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 1 0 1 2 1 5 0 0 0 0 0
8:30 AM 1 0 0 1 0 0 0 1 1 0 0 1 5 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 1 1 1 0 5 0 8 0 0 0 0 0
VOLUMES 2 0 2 2 2 1 1 12 4 1 23 2 52 0 0 0 0 0
APPROACH % 50% 0% 50% 40% 40% 20% 6% 71% 24% 4% 88% 8%
APP/DEPART 4 / 3 5 / 7 17 / 16 26 / 26 0

BEGIN PEAK HR
VOLUMES 1 0 2 1 1 1 0 4 1 1 13 1 26 0 0 0 0
APPROACH % 33% 0% 67% 33% 33% 33% 0% 80% 20% 7% 87% 7%
PEAK HR FACTOR 0.375 0.375 0.625 0.625 0.650
APP/DEPART 3 / 1 3 / 3 5 / 7 15 / 15 0
4:00 PM 0 0 1 0 0 0 0 1 0 0 1 0 3 0 0 0 0 0
4:15 PM 0 0 1 0 0 0 0 2 0 0 0 0 3 0 0 0 0 0
4:30 PM 1 0 1 0 0 0 0 3 0 1 2 1 9 0 0 0 0 0
4:45 PM 1 0 1 0 0 0 1 2 0 0 2 0 7 0 0 0 0 0
5:00 PM 0 0 1 0 0 0 0 3 0 0 0 0 4 0 0 0 0 0
5:15 PM 0 0 1 0 0 0 1 5 0 0 1 0 8 0 0 0 0 0
5:30 PM 0 1 0 0 0 0 0 1 0 0 0 0 2 0 0 0 0 0
5:45 PM 1 0 0 0 0 0 0 1 0 0 0 0 2 0 0 0 0 0
VOLUMES 3 1 6 0 0 0 2 18 0 1 6 1 38 0 0 0 0 0
APPROACH % 30% 10% 60% 0% 0% 0% 10% 90% 0% 13% 75% 13%
APP/DEPART 10 / 4 0 / 1 20 / 24 8 / 9 0

BEGIN PEAK HR
VOLUMES 1 1 3 0 0 0 2 11 0 0 3 0 21 0 0 0 0
APPROACH % 20% 20% 60% 0% 0% 0% 15% 85% 0% 0% 100% 0%
PEAK HR FACTOR 0.625 0.000 0.542 0.375 0.656
APP/DEPART 5 / 3 0 / 0 13 / 14 3 / 4 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 0 0 0 1 0 0 0 4 0 0 6 0 11 0 0 0 0 0
7:15 AM 1 0 1 0 0 0 0 3 0 1 1 0 7 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 3 0 0 3 0 6 0 0 0 0 0
7:45 AM 1 0 0 0 0 0 0 2 1 0 3 0 7 0 0 0 0 0
8:00 AM 0 0 1 0 0 0 0 0 0 0 3 0 4 0 0 0 0 0
8:15 AM 0 1 0 0 0 0 0 3 0 0 5 0 9 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 1 0 1 4 0 6 0 0 0 0 0
8:45 AM 0 0 1 0 1 0 0 3 0 0 1 0 6 0 0 0 0 0
VOLUMES 2 1 3 1 1 0 0 19 1 2 26 0 56 0 0 0 0 0
APPROACH % 33% 17% 50% 50% 50% 0% 0% 95% 5% 7% 93% 0%
APP/DEPART 6 / 1 2 / 4 20 / 23 28 / 28 0

BEGIN PEAK HR
VOLUMES 1 1 1 0 0 0 0 8 1 0 14 0 26 0 0 0 0
APPROACH % 33% 33% 33% 0% 0% 0% 0% 89% 11% 0% 100% 0%
PEAK HR FACTOR 0.750 0.000 0.750 0.700 0.722
APP/DEPART 3 / 1 0 / 1 9 / 9 14 / 15 0
4:00 PM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 2 0 1 1 0 4 0 0 0 0 0
4:30 PM 1 0 1 0 0 0 0 4 1 1 2 0 10 0 0 0 0 0
4:45 PM 0 0 0 1 0 0 0 7 1 0 2 0 11 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 4 0 1 0 0 5 0 0 0 0 0
5:15 PM 0 0 1 0 0 0 0 4 0 0 1 0 6 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
VOLUMES 1 0 2 1 0 0 0 26 2 3 11 0 46 0 0 0 0 0
APPROACH % 33% 0% 67% 100% 0% 0% 0% 93% 7% 21% 79% 0%
APP/DEPART 3 / 0 1 / 5 28 / 29 14 / 12 0

BEGIN PEAK HR
VOLUMES 0 0 1 1 0 0 0 17 1 1 5 0 26 0 0 0 0
APPROACH % 0% 0% 100% 100% 0% 0% 0% 94% 6% 17% 83% 0%
PEAK HR FACTOR 0.250 0.250 0.563 0.750 0.591
APP/DEPART 1 / 0 1 / 2 18 / 19 6 / 5 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 1 / 1 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Old Farm Rd

NORTH SIDE
Rosedale Hwy WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Old Farm Rd LOCATION #: 7
THURSDAY EAST & WEST: Rosedale Hwy CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 1 1 1 1 1 1 1 2 0 1 2 0
7:00 AM 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 2 0 1 2 0 5 0 0 0 0 0
7:30 AM 0 2 0 0 0 0 1 1 4 0 1 0 9 0 0 0 0 0
7:45 AM 1 0 2 0 0 0 0 0 1 0 0 0 4 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 3 0 0 0 0 0 3 0 0 0 0 0
8:15 AM 2 0 1 0 0 0 4 2 1 1 2 0 13 0 0 1 0 1
8:30 AM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 3 2 3 0 0 0 8 6 6 3 6 0 38 0 0 1 0 1
APPROACH % 38% 25% 38% 0% 0% 0% 38% 29% 29% 33% 67% 0%
APP/DEPART 8 / 10 0 / 9 21 / 9 9 / 10 0

BEGIN PEAK HR
VOLUMES 3 2 3 0 0 0 8 3 6 1 3 0 30 0 0 1 0
APPROACH % 38% 25% 38% 0% 0% 0% 44% 17% 33% 25% 75% 0%
PEAK HR FACTOR 0.667 0.000 0.563 0.333 0.536
APP/DEPART 8 / 10 0 / 7 18 / 6 4 / 7 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
4:45 PM 0 0 0 0 1 0 0 1 0 0 0 0 2 0 0 1 0 1
5:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
5:15 PM 0 0 1 0 0 0 0 2 0 0 0 0 3 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 1 0 1 0 0 5 0 0 4 0 12 0 0 1 0 1
APPROACH % 0% 0% 100% 0% 100% 0% 0% 83% 0% 0% 100% 0%
APP/DEPART 1 / 0 1 / 1 6 / 6 4 / 5 0

BEGIN PEAK HR
VOLUMES 0 0 1 0 1 0 0 4 0 0 2 0 9 0 0 1 0
APPROACH % 0% 0% 100% 0% 100% 0% 0% 80% 0% 0% 100% 0%
PEAK HR FACTOR 0.250 0.250 0.625 0.250 0.750
APP/DEPART 1 / 0 1 / 1 5 / 5 2 / 3 0
Old Farm Rd

NORTH SIDE
WEST SIDE EAST SIDE Rosedale Hwy

SOUTH SIDE
Old Farm Rd
Rosedale Hwy
7:30 AM
4:45 PM AM PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Old Farm Rd Old Farm Rd Rosedale Hwy Rosedale Hwy
T020624
DATE: LOCATION: PROJECT #: SC4983
Thu, Oct 24, 24 NORTH & SOUTH: LOCATION #: 8
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1 0 0 0 0
7:00 AM 32 144 0 1 220 18 37 0 86 49 35 60 682 0 1 0 0 1 7:15 AM 37 192 0 0 283 32 38 1 112 57 52 80 884 0 2 0 0 2 7:30 AM 70 208 0 0 275 32 57 0 121 78 93 81 1,015 1 3 0 0 4 7:45 AM 98 333 0 0 434 54 57 0 151 117 125 116 1,485 0 3 0 0 3 8:00 AM 64 272 1 0 269 44 72 0 161 118 105 104 1,210 0 4 0 0 4 8:15 AM 54 231 1 2 355 43 63 0 120 81 84 88 1,122 0 1 0 0 1 8:30 AM 56 208 0 1 286 45 44 0 118 83 71 83 995 0 4 0 0 4 8:45 AM 62 222 1 0 273 24 46 0 108 67 71 94 968 0 2 0 0 2 VOLUMES 473 1,810 3 4 2,395 292 414 1 977 650 636 706 8,382 1 20 0 0 21 APPROACH % 21% 79% 0% 0% 88% 11% 30% 0% 70% 33% 32% 35% APP/DEPART 2,287 / 2,950 2,711 / 4,023 1,392 / 8 1,992 / 1,401 0

BEGIN PEAK HR
VOLUMES 286 1,044 2 2 1,333 173 249 0 553 394 407 389 4,844 1 11 0 0 APPROACH % 21% 78% 0% 0% 88% 11% 31% 0% 69% 33% 34% 33% PEAK HR FACTOR 0.773 0.773 0.861 0.831 0.814
APP/DEPART 1,333 / 1,693 1,519 / 2,281 802 / 4 1,190 / 866 0 4:00 PM 84 322 0 4 357 53 57 0 157 114 118 132 1,398 1 4 0 0 5 4:15 PM 75 360 10 0 389 61 45 1 153 125 117 114 1,450 0 3 0 0 3 4:30 PM 74 280 3 2 415 50 48 1 157 95 114 114 1,353 0 4 0 0 4 4:45 PM 81 300 1 1 379 75 57 0 123 136 144 140 1,437 1 8 0 0 9 5:00 PM 79 307 1 1 396 46 62 0 197 122 113 106 1,430 0 2 0 0 2 5:15 PM 62 309 8 1 357 63 84 0 179 118 127 118 1,426 0 6 0 0 6 5:30 PM 78 281 0 1 368 60 50 1 143 113 128 113 1,336 2 4 0 0 6 5:45 PM 74 300 1 1 345 54 39 1 108 90 84 97 1,194 1 5 0 0 6 VOLUMES 607 2,459 24 11 3,006 462 442 4 1,217 913 945 934 11,065 5 36 0 0 41 APPROACH % 20% 79% 1% 0% 86% 13% 27% 0% 73% 33% 34% 33% APP/DEPART 3,095 / 3,871 3,515 / 5,141 1,663 / 39 2,792 / 2,014 0

BEGIN PEAK HR
VOLUMES 309 1,247 15 4 1,579 232 212 2 630 478 488 474 5,688 1 17 0 0 APPROACH % 20% 79% 1% 0% 86% 13% 25% 0% 75% 33% 34% 33% PEAK HR FACTOR 0.883 0.972 0.815 0.857 0.979
APP/DEPART 1,572 / 1,950 1,832 / 2,688 844 / 21 1,440 / 1,029 0 Coffee Rd

NORTH LEG
Brimhall Rd WEST LEG EAST LEG Brimhall Rd

SOUTH LEG
Coffee Rd

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 1 0 1 0 2 1 0 1 0 2 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1
TOTAL 1 0 2 0 3 1 0 1 0 2 0 0 1 0 1
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 1 1 0 1 3 0 0 0 0 0 1 1 0 1 3
4:30 PM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1
4:45 PM 2 0 0 0 2 0 0 0 0 0 2 0 0 0 2
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1
5:45 PM 0 0 2 0 2 0 0 0 0 0 0 0 2 0 2
TOTAL 3 1 4 1 9 0 0 0 0 0 3 1 4 1 9

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:15 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Coffee Rd
Brimhall Rd

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
[ ]
[ ]
6,226 754 5,401 15 TOTAL 6,821
3,515 462 3,006 11 PM 3,871
2,711 292 2,395 4 AM 2,950 1,992 2,792 4,784 3,415 2,014 1,401 706 934 1,640 636 945 1,581 TOTAL PMAM650 913 1,563 856 442 414 AMPM TOTAL 5 4 1 2,194 1,217 977 8 39 47 3,055 1,663 1,392 4,023 AM 473 1,810 3 2,287
5,141 PM 607 2,459 24 3,095
9,164 TOTAL 1,080 4,269 27 5,382
3,351 405 2,912 6 TOTAL 3,643
1,832 232 1,579 4 PM 1,950
1,519 173 1,333 2 AM 1,693 1,190 1,440 2,630 1,895 1,029 866 389 474 863 407 488 895 TOTAL PMAMAM 7:30 AM 8:45 AM 394 478 872 461 212 249
#N/A AMPM TOTAL 2 2 0 PM 4:15 PM
3:45 PM 1,183 630 553 4 21 25 1,646 844 802
2,281 AM 286 1,044 2 1,333
2,688 PM 309 1,247 15 1,572
4,969 Total 595 2,291 17 2,905
Coffee Rd
AimTD LLC

TURNING MOVEMENT COUNTS
Coffee Rd Brimhall RdBrimhall RdALL HOURS
Coffee Rd
Coffee Rd Brimhall RdBrimhall Rd

PEAK HOUR
Bakersfield
SC4983
I I I ] ] A A A
V V [ [ I I
I I I ] ] A A A
V V [ [ I I I
]
]
[
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 39 150 0 2 248 23 39 0 88 51 40 65 743 0
7:15 AM 39 197 0 0 309 35 42 1 116 66 59 92 954 0
7:30 AM 73 217 0 0 293 35 59 0 124 82 96 81 1,058 0
7:45 AM 103 350 0 0 457 55 59 0 158 121 133 120 1,554 0 8:00 AM 69 287 1 0 287 48 76 0 165 124 108 112 1,276 0
8:15 AM 58 252 1 2 379 45 69 0 123 83 88 96 1,195 0
8:30 AM 60 222 0 1 310 46 46 0 121 85 76 90 1,056 0
8:45 AM 62 235 1 0 297 26 49 0 112 69 74 102 1,026 0
VOLUMES 502 1,909 3 5 2,580 311 438 1 1,006 680 672 756 8,860 0 0 0 0 0 APPROACH % 21% 79% 0% 0% 89% 11% 30% 0% 70% 32% 32% 36% APP/DEPART 2,413 / 3,102 2,896 / 4,265 1,444 / 9 2,108 / 1,485 0

BEGIN PEAK HR
VOLUMES 303 1,106 2 2 1,416 182 262 0 569 409 425 408 5,082 APPROACH % 21% 78% 0% 0% 88% 11% 32% 0% 68% 33% 34% 33% PEAK HR FACTOR 0.778 0.781 0.863 0.833 0.817
APP/DEPART 1,410 / 1,776 1,600 / 2,393 831 / 4 1,242 / 909 0 4:00 PM 87 343 0 4 370 54 61 0 159 118 119 136 1,450 0
4:15 PM 79 379 10 0 397 61 47 1 154 128 122 124 1,500 0 4:30 PM 77 292 3 2 428 52 48 1 162 96 119 115 1,394 0
4:45 PM 82 307 1 1 396 78 58 0 124 139 148 142 1,473 0
5:00 PM 80 321 1 1 405 47 63 0 197 126 117 115 1,470 0
5:15 PM 63 316 8 1 362 65 85 0 185 119 130 121 1,453 0
5:30 PM 78 290 0 1 378 60 50 1 148 114 131 113 1,362 0
5:45 PM 74 306 1 1 352 54 41 1 111 95 88 104 1,227 0
VOLUMES 619 2,552 24 11 3,085 470 451 4 1,239 933 972 969 11,327 0 0 0 0 0 APPROACH % 19% 80% 1% 0% 87% 13% 27% 0% 73% 32% 34% 34% APP/DEPART 3,194 / 3,971 3,566 / 5,257 1,694 / 39 2,873 / 2,060 0

BEGIN PEAK HR
VOLUMES 317 1,298 15 4 1,625 237 215 2 637 489 505 495 5,836 APPROACH % 19% 80% 1% 0% 87% 13% 25% 0% 75% 33% 34% 33% PEAK HR FACTOR 0.871 0.968 0.822 0.869 0.973
APP/DEPART 1,629 / 2,007 1,866 / 2,750 853 / 21 1,489 / 1,059 0 Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 28 137 0 0 196 12 34 0 82 47 31 53 620 0 0 0 0 0 7:15 AM 35 184 0 0 256 29 32 1 107 51 47 65 807 0 0 0 0 0 7:30 AM 67 197 0 0 253 30 55 0 117 74 89 81 963 1 3 0 0 4 7:45 AM 93 313 0 0 406 52 54 0 145 113 116 112 1,404 0 3 0 0 3 8:00 AM 58 254 1 0 251 40 67 0 157 112 100 97 1,137 0 4 0 0 4 8:15 AM 51 207 1 2 329 42 56 0 117 78 79 79 1,041 0 1 0 0 1 8:30 AM 52 194 0 1 261 43 42 0 113 79 65 75 925 0 4 0 0 4 8:45 AM 62 206 1 0 244 21 43 0 104 66 66 88 901 0 2 0 0 2 VOLUMES 446 1,692 3 3 2,196 269 383 1 942 620 593 650 7,816 1 17 0 0 18 APPROACH % 21% 79% 0% 0% 88% 11% 29% 0% 71% 33% 32% 35% APP/DEPART 2,142 / 2,742 2,485 / 3,759 1,326 / 7 1,863 / 1,308 0

BEGIN PEAK HR
VOLUMES 269 971 2 2 1,239 164 232 0 536 377 384 369 4,557 1 11 0 0 APPROACH % 22% 78% 0% 0% 88% 12% 30% 0% 70% 33% 34% 33% PEAK HR FACTOR 0.765 0.768 0.857 0.828 0.810
APP/DEPART 1,243 / 1,583 1,416 / 2,153 768 / 4 1,130 / 817 0 4:00 PM 82 302 0 4 343 52 53 0 156 110 116 126 1,344 1 4 0 0 5 4:15 PM 70 340 10 0 380 61 43 1 151 121 112 107 1,396 0 3 0 0 3 4:30 PM 72 268 3 2 401 49 48 1 154 94 108 112 1,312 0 4 0 0 4 4:45 PM 80 286 1 1 367 71 56 0 122 132 139 137 1,392 1 8 0 0 9 5:00 PM 78 291 1 1 387 45 61 0 197 117 110 99 1,387 0 2 0 0 2 5:15 PM 61 300 8 1 351 60 83 0 174 117 123 115 1,393 0 6 0 0 6 5:30 PM 78 271 0 1 356 60 50 1 138 112 125 113 1,305 2 4 0 0 6 5:45 PM 74 291 1 1 339 54 38 1 105 87 82 93 1,166 1 5 0 0 6 VOLUMES 595 2,349 24 11 2,924 452 432 4 1,197 890 915 902 10,736 5 36 0 0 41 APPROACH % 20% 79% 1% 0% 85% 13% 26% 0% 73% 33% 34% 33% APP/DEPART 2,973 / 3,719 3,423 / 5,016 1,633 / 39 2,707 / 1,962 0

BEGIN PEAK HR
VOLUMES 300 1,185 15 4 1,535 226 208 2 624 464 469 455 5,505 1 17 0 0 APPROACH % 20% 79% 1% 0% 86% 13% 25% 0% 75% 33% 34% 33% PEAK HR FACTOR 0.893 0.977 0.808 0.850 0.982
APP/DEPART 1,501 / 1,865 1,782 / 2,624 834 / 21 1,388 / 995 0 Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 1 5 0 0 10 4 2 0 4 1 0 5 32 0 1 0 0 1
7:15 AM 1 7 0 0 14 1 4 0 2 2 1 10 42 0 1 0 0 1
7:30 AM 1 8 0 0 15 1 1 0 3 0 2 0 31 0 0 0 0 0
7:45 AM 2 12 0 0 20 2 3 0 2 3 5 3 52 0 0 0 0 0
8:00 AM 2 10 0 0 10 3 2 0 1 3 4 2 37 0 0 0 0 0
8:15 AM 0 15 0 0 14 0 4 0 1 2 4 7 47 0 0 0 0 0
8:30 AM 2 6 0 0 14 2 1 0 4 4 5 5 43 0 0 0 0 0
8:45 AM 0 12 0 0 20 3 2 0 2 0 5 2 46 0 0 0 0 0
VOLUMES 9 75 0 0 117 16 19 0 19 15 26 34 332 0 2 0 0 2
APPROACH % 11% 89% 0% 0% 87% 12% 50% 0% 50% 20% 35% 45% APP/DEPART 84 / 130 135 / 151 38 / 0 75 / 51 0

BEGIN PEAK HR
VOLUMES 5 45 0 0 59 6 10 0 7 8 15 12 167 0 0 0 0
APPROACH % 10% 90% 0% 0% 91% 9% 59% 0% 41% 23% 43% 34%
PEAK HR FACTOR 0.833 0.739 0.850 0.673 0.803
APP/DEPART 50 / 67 65 / 74 17 / 0 35 / 26 0
4:00 PM 0 9 0 0 7 0 2 0 0 3 2 4 27 0 0 0 0 0
4:15 PM 4 13 0 0 7 0 1 0 2 2 3 3 35 0 0 0 0 0
4:30 PM 1 7 0 0 6 0 0 0 0 0 4 2 20 0 0 0 0 0
4:45 PM 1 14 0 0 3 3 1 0 1 3 4 3 33 0 0 0 0 0
5:00 PM 1 11 0 0 5 1 1 0 0 4 1 2 26 0 0 0 0 0
5:15 PM 0 6 0 0 5 3 1 0 2 1 3 2 23 0 0 0 0 0
5:30 PM 0 7 0 0 7 0 0 0 2 1 1 0 18 0 0 0 0 0
5:45 PM 0 8 0 0 2 0 0 0 1 1 0 1 13 0 0 0 0 0
VOLUMES 7 75 0 0 42 7 6 0 8 15 18 17 195 0 0 0 0 0
APPROACH % 9% 91% 0% 0% 86% 14% 43% 0% 57% 30% 36% 34%
APP/DEPART 82 / 98 49 / 65 14 / 0 50 / 32 0

BEGIN PEAK HR
VOLUMES 7 45 0 0 21 4 3 0 3 9 12 10 114 0 0 0 0
APPROACH % 13% 87% 0% 0% 84% 16% 50% 0% 50% 29% 39% 32% PEAK HR FACTOR 0.765 0.893 0.500 0.775 0.814
APP/DEPART 52 / 58 25 / 33 6 / 0 31 / 23 0
Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 0 1 0 1 4 0 1 0 0 1 3 2 13 0 0 0 0 0
7:15 AM 1 1 0 0 4 1 2 0 3 0 2 2 16 0 0 0 0 0
7:30 AM 0 1 0 0 4 0 1 0 1 3 1 0 11 0 0 0 0 0
7:45 AM 2 3 0 0 2 0 0 0 1 0 3 0 11 0 0 0 0 0
8:00 AM 4 3 0 0 1 0 0 0 2 1 1 1 13 0 0 0 0 0
8:15 AM 2 3 0 0 5 0 0 0 2 0 0 0 12 0 0 0 0 0
8:30 AM 1 2 0 0 3 0 0 0 1 0 0 0 7 0 0 0 0 0
8:45 AM 0 1 0 0 2 0 0 0 1 0 0 1 5 0 0 0 0 0
VOLUMES 10 15 0 1 25 1 4 0 11 5 10 6 88 0 0 0 0 0
APPROACH % 40% 60% 0% 4% 93% 4% 27% 0% 73% 24% 48% 29%
APP/DEPART 25 / 25 27 / 41 15 / 1 21 / 21 0

BEGIN PEAK HR
VOLUMES 8 10 0 0 12 0 1 0 6 4 5 1 47 0 0 0 0
APPROACH % 44% 56% 0% 0% 100% 0% 14% 0% 86% 40% 50% 10% PEAK HR FACTOR 0.643 0.600 0.875 0.625 0.904
APP/DEPART 18 / 12 12 / 22 7 / 0 10 / 13 0
4:00 PM 1 3 0 0 3 1 0 0 0 0 0 0 8 0 0 0 0 0
4:15 PM 0 1 0 0 0 0 0 0 0 2 1 0 4 0 0 0 0 0
4:30 PM 0 2 0 0 5 0 0 0 1 0 1 0 9 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 0
5:00 PM 0 2 0 0 2 0 0 0 0 0 1 1 6 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:30 PM 0 1 0 0 4 0 0 0 0 0 1 0 6 0 0 0 0 0
5:45 PM 0 0 0 0 1 0 0 0 1 0 0 0 2 0 0 0 0 0
VOLUMES 1 9 0 0 15 1 0 0 2 3 5 1 37 0 0 0 0 0
APPROACH % 10% 90% 0% 0% 94% 6% 0% 0% 100% 33% 56% 11%
APP/DEPART 10 / 10 16 / 20 2 / 0 9 / 7 0

BEGIN PEAK HR
VOLUMES 0 5 0 0 7 0 0 0 1 3 3 1 20 0 0 0 0
APPROACH % 0% 100% 0% 0% 100% 0% 0% 0% 100% 43% 43% 14% PEAK HR FACTOR 0.625 0.350 0.250 0.583 0.556
APP/DEPART 5 / 6 7 / 11 1 / 0 7 / 3 0
Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 3 1 0 0 9 1 0 0 0 0 1 0 15 0 0 0 0 0
7:15 AM 0 0 0 0 6 0 0 0 0 4 2 2 14 0 1 0 0 1
7:30 AM 0 2 0 0 3 1 0 0 0 0 0 0 6 0 0 0 0 0
7:45 AM 1 3 0 0 5 0 0 0 2 1 1 1 14 0 0 0 0 0
8:00 AM 0 2 0 0 5 1 0 0 0 1 0 2 11 0 0 0 0 0
8:15 AM 1 4 0 0 5 1 1 0 0 0 1 2 15 0 0 0 0 0
8:30 AM 1 3 0 0 6 0 0 0 0 0 1 1 12 0 0 0 0 0
8:45 AM 0 3 0 0 5 0 1 0 1 1 0 3 14 0 0 0 0 0
VOLUMES 6 18 0 0 44 4 2 0 3 7 6 11 102 0 1 0 0 1
APPROACH % 25% 75% 0% 0% 90% 8% 40% 0% 60% 29% 25% 46%
APP/DEPART 24 / 32 49 / 54 5 / 0 24 / 16 0

BEGIN PEAK HR
VOLUMES 2 11 0 0 18 3 1 0 2 2 2 5 46 0 0 0 0
APPROACH % 15% 85% 0% 0% 86% 14% 33% 0% 67% 22% 22% 56% PEAK HR FACTOR 0.650 0.875 0.375 0.750 0.767
APP/DEPART 13 / 17 21 / 22 3 / 0 9 / 7 0
4:00 PM 1 5 0 0 2 0 1 0 1 1 0 0 11 0 0 0 0 0
4:15 PM 1 5 0 0 2 0 0 0 0 0 1 4 13 0 0 0 0 0
4:30 PM 1 3 0 0 2 1 0 0 2 0 1 0 10 0 0 0 0 0
4:45 PM 0 0 0 0 6 0 0 0 0 0 1 0 7 0 0 0 0 0
5:00 PM 0 3 0 0 2 0 0 0 0 1 1 3 10 0 0 0 0 0
5:15 PM 0 1 0 0 1 0 0 0 2 0 0 1 5 0 0 0 0 0
5:30 PM 0 2 0 0 1 0 0 0 1 0 0 0 4 0 0 0 0 0
5:45 PM 0 1 0 0 2 0 1 0 0 2 2 3 11 0 0 0 0 0
VOLUMES 3 20 0 0 18 1 2 0 6 4 6 11 71 0 0 0 0 0
APPROACH % 13% 87% 0% 0% 95% 5% 25% 0% 75% 19% 29% 52%
APP/DEPART 23 / 33 19 / 28 8 / 0 21 / 10 0

BEGIN PEAK HR
VOLUMES 2 11 0 0 12 1 0 0 2 1 4 7 40 0 0 0 0
APPROACH % 15% 85% 0% 0% 92% 8% 0% 0% 100% 8% 33% 58%
PEAK HR FACTOR 0.542 0.542 0.250 0.600 0.769
APP/DEPART 13 / 18 13 / 15 2 / 0 12 / 7 0
Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0
8:45 AM 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 0 1 0 0 0 0 0 0 1 2 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 100% 0% 0% 0% 0% 0% 0% 100%
APP/DEPART 0 / 1 1 / 1 0 / 0 1 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 1 0 0 1 2 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100%
APP/DEPART 0 / 1 0 / 1 1 / 0 1 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100%
PEAK HR FACTOR 0.000 0.000 0.000 0.250 0.250
APP/DEPART 0 / 1 0 / 0 0 / 0 1 / 0 0
Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC4983
10/24/24 NORTH & SOUTH: Coffee Rd LOCATION #: 8
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 2.5 0.5 1 3 1 1.5 0.5 2 1.5 1.5 1
7:00 AM 0 0 0 0 1 1 0 0 0 0 0 0 2 0 0 0 0 0
7:15 AM 0 0 0 0 3 1 0 0 0 0 0 1 5 0 0 0 0 0
7:30 AM 2 0 0 0 0 0 0 0 0 1 1 0 4 0 0 0 0 0
7:45 AM 0 2 0 0 1 0 0 0 1 0 0 0 4 0 0 0 0 0
8:00 AM 0 3 0 0 2 0 3 0 1 1 0 2 12 0 0 0 0 0
8:15 AM 0 2 0 0 2 0 2 0 0 1 0 0 7 0 0 0 0 0
8:30 AM 0 3 0 0 2 0 1 0 0 0 0 1 7 0 0 0 0 0
8:45 AM 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0
VOLUMES 2 10 0 0 12 2 6 0 2 3 1 4 42 0 0 0 0 0
APPROACH % 17% 83% 0% 0% 86% 14% 75% 0% 25% 38% 13% 50% APP/DEPART 12 / 20 14 / 17 8 / 0 8 / 5 0

BEGIN PEAK HR
VOLUMES 2 7 0 0 5 0 5 0 2 3 1 2 27 0 0 0 0
APPROACH % 22% 78% 0% 0% 100% 0% 71% 0% 29% 50% 17% 33% PEAK HR FACTOR 0.750 0.625 0.438 0.500 0.563
APP/DEPART 9 / 14 5 / 10 7 / 0 6 / 3 0
4:00 PM 0 3 0 0 2 0 1 0 0 0 0 2 8 0 0 0 0 0
4:15 PM 0 1 0 0 0 0 1 0 0 0 0 0 2 0 0 0 0 0
4:30 PM 0 0 0 0 1 0 0 0 0 1 0 0 2 0 0 0 0 0
4:45 PM 0 0 0 0 3 1 0 0 0 0 0 0 4 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 1 2 0 0 0 0 0 0 1 0 0 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 2 0 1 0 3 0 0 0 0 0
5:45 PM 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0
VOLUMES 1 6 0 0 7 1 2 0 3 1 1 2 24 0 0 0 0 0
APPROACH % 14% 86% 0% 0% 88% 13% 40% 0% 60% 25% 25% 50% APP/DEPART 7 / 10 8 / 11 5 / 0 4 / 3 0

BEGIN PEAK HR
VOLUMES 0 1 0 0 4 1 1 0 0 1 0 0 8 0 0 0 0
APPROACH % 0% 100% 0% 0% 80% 20% 100% 0% 0% 100% 0% 0%
PEAK HR FACTOR 0.250 0.313 0.250 0.250 0.500
APP/DEPART 1 / 2 5 / 5 1 / 0 1 / 1 0
Coffee Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Coffee Rd AM
7:30 AM PM
4:15 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Coffee Rd Coffee Rd Brimhall Rd Brimhall Rd
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 9
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X 0 0 0 0
7:00 AM 4 0 12 0 0 0 0 94 0 3 58 0 171 0 0 0 0 0
7:15 AM 9 0 11 0 0 0 0 123 3 4 101 0 251 0 0 0 0 0
7:30 AM 15 0 19 0 0 0 0 149 3 3 129 0 318 0 0 0 0 0
7:45 AM 12 0 17 0 0 0 0 216 8 4 154 0 411 0 0 0 0 0
8:00 AM 23 0 31 0 0 0 0 205 6 12 141 0 418 0 0 0 0 0
8:15 AM 16 0 13 0 0 0 0 171 12 8 105 0 325 0 0 0 0 0
8:30 AM 5 0 14 0 0 0 0 162 9 2 102 0 294 0 0 0 0 0
8:45 AM 5 0 14 0 0 0 0 123 3 5 115 0 265 0 0 0 0 0
VOLUMES 89 0 131 0 0 0 0 1,243 44 41 905 0 2,453 0 0 0 0 0 APPROACH % 40% 0% 60% 0% 0% 0% 0% 97% 3% 4% 96% 0%
APP/DEPART 220 / 0 0 / 85 1,287 / 1,374 946 / 994 0

BEGIN PEAK HR
VOLUMES 66 0 80 0 0 0 0 741 29 27 529 0 1,472 0 0 0 0
APPROACH % 45% 0% 55% 0% 0% 0% 0% 96% 4% 5% 95% 0%
PEAK HR FACTOR 0.676 0.000 0.859 0.880 0.880
APP/DEPART 146 / 0 0 / 56 770 / 821 556 / 595 0
4:00 PM 7 0 9 0 0 0 0 136 9 9 192 0 362 0 0 0 0 0
4:15 PM 9 0 7 0 0 0 0 125 13 14 185 0 353 0 0 0 0 0
4:30 PM 18 0 14 0 0 0 0 149 4 8 165 0 358 0 0 0 0 0
4:45 PM 12 0 7 0 0 0 0 126 4 18 215 0 382 0 0 0 0 0
5:00 PM 11 0 9 0 0 0 0 142 18 12 212 0 404 0 0 0 0 0
5:15 PM 17 0 11 0 0 0 0 141 21 14 222 0 426 0 0 0 0 0
5:30 PM 10 0 9 0 0 0 0 140 12 12 193 0 376 0 0 0 0 0
5:45 PM 14 0 11 0 0 0 0 109 10 7 175 0 326 0 0 0 0 0
VOLUMES 98 0 77 0 0 0 0 1,068 91 94 1,559 0 2,987 0 0 0 0 0 APPROACH % 56% 0% 44% 0% 0% 0% 0% 92% 8% 6% 94% 0%
APP/DEPART 175 / 0 0 / 185 1,159 / 1,145 1,653 / 1,657 0

BEGIN PEAK HR
VOLUMES 50 0 36 0 0 0 0 549 55 56 842 0 1,588 0 0 0 0
APPROACH % 58% 0% 42% 0% 0% 0% 0% 91% 9% 6% 94% 0%
PEAK HR FACTOR 0.768 0.000 0.932 0.951 0.932
APP/DEPART 86 / 0 0 / 111 604 / 585 898 / 892 0
Harvest Creek Rd

NORTH LEG
Brimhall Rd WEST LEG EAST LEG Brimhall Rd

SOUTH LEG
Harvest Creek Rd

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
7:45 AM 2 2 0 0 4 0 2 0 0 2 2 0 0 0 2
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 1 0 0 1 0 0 0 0 0 0 1 0 0 1
TOTAL 2 4 0 0 6 0 3 0 0 3 2 1 0 0 3
4:00 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
4:15 PM 1 4 0 0 5 0 4 0 0 4 1 0 0 0 1
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 1 0 0 1 0 1 0 0 1 0 0 0 0 0
5:00 PM 1 1 0 0 2 0 1 0 0 1 1 0 0 0 1
5:15 PM 0 2 0 0 2 0 2 0 0 2 0 0 0 0 0
5:30 PM 1 1 0 0 2 0 0 0 0 0 1 1 0 0 2
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 3 11 0 0 14 0 10 0 0 10 3 1 0 0 4

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Harvest Creek Rd
Brimhall Rd

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
4:45 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS
[ ]
[ ]
0 0 0 0 TOTAL 0
0 0 0 0 PM 0
0 0 0 0 AM 0 946 1,653 2,599 2,651 1,657 994 0 0 0 905 1,559 2,464 TOTAL PMAM41 94 135 0 0 0 AMPM TOTAL 2,311 1,068 1,243 135 91 44 1,374 1,145 2,519 2,446 1,159 1,287 85 AM 89 0 131 220
185 PM 98 0 77 175
270 TOTAL 187 0 208 395
0 0 0 0 TOTAL 0
0 0 0 0 PM 0
0 0 0 0 AM 0 556 898 1,454 1,487 892 595 0 0 0 529 842 1,371 TOTAL PMAMAM 7:30 AM 8:45 AM 27 56 83 0 0 0
#N/A AMPM TOTAL 1,290 549 741 PM 4:45 PM
3:45 PM 84 55 29 821 585 1,406 1,374 604 770
56 AM 66 0 80 146
111 PM 50 0 36 86
167 Total 116 0 116 232
Harvest Creek Rd
AimTD LLC

TURNING MOVEMENT COUNTS
Harvest Creek Rd Brimhall RdBrimhall RdALL HOURS
Harvest Creek Rd
Harvest Creek Rd Brimhall RdBrimhall Rd

PEAK HOUR
Bakersfield
SC5147
I I I ] [ ] A A A
C
•)
< A CP
V V [ ] [ I I I
I I I ] [ ] A A A
1 (
•)
< A CP
V V [ ] [ I I I ]
[
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 4 0 12 0 0 0 0 99 0 5 72 0 191 0
7:15 AM 9 0 11 0 0 0 0 129 3 5 117 0 273 0
7:30 AM 17 0 19 0 0 0 0 150 3 5 137 0 330 0
7:45 AM 13 0 18 0 0 0 0 222 9 4 157 0 422 0
8:00 AM 23 0 34 0 0 0 0 209 7 14 146 0 432 0
8:15 AM 18 0 13 0 0 0 0 175 12 8 110 0 335 0
8:30 AM 7 0 14 0 0 0 0 168 9 2 107 0 307 0
8:45 AM 5 0 14 0 0 0 0 127 3 6 120 0 275 0
VOLUMES 95 0 134 0 0 0 0 1,277 46 47 965 0 2,563 0 0 0 0 0 APPROACH % 41% 0% 59% 0% 0% 0% 0% 97% 3% 5% 95% 0%
APP/DEPART 229 / 0 0 / 92 1,323 / 1,411 1,011 / 1,060 0

BEGIN PEAK HR
VOLUMES 71 0 83 0 0 0 0 755 31 30 549 0 1,518
APPROACH % 46% 0% 54% 0% 0% 0% 0% 96% 4% 5% 95% 0%
PEAK HR FACTOR 0.679 0.000 0.854 0.899 0.879
APP/DEPART 154 / 0 0 / 61 786 / 838 579 / 620 0
4:00 PM 7 0 10 0 0 0 0 141 9 9 197 0 373 0
4:15 PM 9 0 7 0 0 0 0 128 15 14 191 0 364 0
4:30 PM 18 0 16 0 0 0 0 155 4 8 171 0 371 0
4:45 PM 12 0 9 0 0 0 0 127 4 18 216 0 385 0
5:00 PM 11 0 9 0 0 0 0 143 20 12 218 0 413 0
5:15 PM 17 0 12 0 0 0 0 143 21 15 228 0 435 0
5:30 PM 10 0 9 0 0 0 0 140 12 14 198 0 383 0
5:45 PM 14 0 12 0 0 0 0 113 10 7 179 0 334 0
VOLUMES 98 0 83 0 0 0 0 1,088 95 96 1,597 0 3,056 0 0 0 0 0 APPROACH % 54% 0% 46% 0% 0% 0% 0% 92% 8% 6% 94% 0%
APP/DEPART 181 / 0 0 / 191 1,183 / 1,170 1,693 / 1,695 0

BEGIN PEAK HR
VOLUMES 50 0 38 0 0 0 0 552 57 58 860 0 1,615
APPROACH % 57% 0% 43% 0% 0% 0% 0% 91% 9% 6% 94% 0%
PEAK HR FACTOR 0.772 0.000 0.928 0.946 0.928
APP/DEPART 88 / 0 0 / 115 609 / 590 918 / 910 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd AM
7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 4 0 12 0 0 0 0 91 0 1 43 0 151 0 0 0 0 0
7:15 AM 9 0 11 0 0 0 0 118 3 3 86 0 230 0 0 0 0 0
7:30 AM 13 0 19 0 0 0 0 148 3 1 123 0 307 0 0 0 0 0
7:45 AM 11 0 16 0 0 0 0 211 7 4 150 0 399 0 0 0 0 0
8:00 AM 23 0 28 0 0 0 0 201 5 10 135 0 402 0 0 0 0 0
8:15 AM 14 0 13 0 0 0 0 166 12 8 100 0 313 0 0 0 0 0
8:30 AM 3 0 14 0 0 0 0 154 9 2 95 0 277 0 0 0 0 0
8:45 AM 5 0 14 0 0 0 0 119 3 4 107 0 252 0 0 0 0 0
VOLUMES 82 0 127 0 0 0 0 1,208 42 33 839 0 2,331 0 0 0 0 0 APPROACH % 39% 0% 61% 0% 0% 0% 0% 97% 3% 4% 96% 0%
APP/DEPART 209 / 0 0 / 75 1,250 / 1,335 872 / 921 0

BEGIN PEAK HR
VOLUMES 61 0 76 0 0 0 0 726 27 23 508 0 1,421 0 0 0 0
APPROACH % 45% 0% 55% 0% 0% 0% 0% 96% 4% 4% 96% 0%
PEAK HR FACTOR 0.672 0.000 0.864 0.862 0.884
APP/DEPART 137 / 0 0 / 50 753 / 802 531 / 569 0
4:00 PM 7 0 8 0 0 0 0 130 9 9 185 0 348 0 0 0 0 0
4:15 PM 9 0 7 0 0 0 0 122 12 14 180 0 344 0 0 0 0 0
4:30 PM 18 0 12 0 0 0 0 145 4 8 157 0 344 0 0 0 0 0
4:45 PM 12 0 4 0 0 0 0 125 4 18 214 0 377 0 0 0 0 0
5:00 PM 11 0 9 0 0 0 0 141 17 12 204 0 394 0 0 0 0 0
5:15 PM 17 0 10 0 0 0 0 139 21 13 216 0 416 0 0 0 0 0
5:30 PM 10 0 9 0 0 0 0 140 12 10 187 0 368 0 0 0 0 0
5:45 PM 14 0 10 0 0 0 0 105 10 7 170 0 316 0 0 0 0 0
VOLUMES 98 0 69 0 0 0 0 1,047 89 91 1,513 0 2,907 0 0 0 0 0 APPROACH % 59% 0% 41% 0% 0% 0% 0% 92% 8% 6% 94% 0%
APP/DEPART 167 / 0 0 / 180 1,136 / 1,116 1,604 / 1,611 0

BEGIN PEAK HR
VOLUMES 50 0 32 0 0 0 0 545 54 53 821 0 1,555 0 0 0 0
APPROACH % 61% 0% 39% 0% 0% 0% 0% 91% 9% 6% 94% 0%
PEAK HR FACTOR 0.759 0.000 0.936 0.942 0.934
APP/DEPART 82 / 0 0 / 107 599 / 577 874 / 871 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 0 0 0 0 0 0 0 1 0 1 7 0 9 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 1 0 1 8 0 10 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 1 0 1 0 0 2 0 0 0 0 0
7:45 AM 0 0 1 0 0 0 0 1 1 0 2 0 5 0 0 0 0 0
8:00 AM 0 0 1 0 0 0 0 0 0 1 3 0 5 0 0 0 0 0
8:15 AM 1 0 0 0 0 0 0 2 0 0 3 0 6 0 0 0 0 0
8:30 AM 1 0 0 0 0 0 0 6 0 0 4 0 11 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 2 0 1 6 0 9 0 0 0 0 0
VOLUMES 2 0 2 0 0 0 0 14 1 5 33 0 57 0 0 0 0 0
APPROACH % 50% 0% 50% 0% 0% 0% 0% 93% 7% 13% 87% 0%
APP/DEPART 4 / 0 0 / 6 15 / 16 38 / 35 0

BEGIN PEAK HR
VOLUMES 1 0 2 0 0 0 0 4 1 2 8 0 18 0 0 0 0
APPROACH % 33% 0% 67% 0% 0% 0% 0% 80% 20% 20% 80% 0%
PEAK HR FACTOR 0.750 0.000 0.625 0.625 0.750
APP/DEPART 3 / 0 0 / 3 5 / 6 10 / 9 0
4:00 PM 0 0 0 0 0 0 0 4 0 0 5 0 9 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 0 1 0 0 6 0 8 0 0 0 0 0
4:45 PM 0 0 3 0 0 0 0 1 0 0 1 0 5 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 1 0 0 6 0 7 0 0 0 0 0
5:15 PM 0 0 1 0 0 0 0 0 0 1 2 0 4 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 1 4 0 5 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 3 0 0 3 0 6 0 0 0 0 0
VOLUMES 0 0 5 0 0 0 0 11 0 2 29 0 47 0 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 6% 94% 0%
APP/DEPART 5 / 0 0 / 2 11 / 16 31 / 29 0

BEGIN PEAK HR
VOLUMES 0 0 4 0 0 0 0 2 0 2 13 0 21 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 13% 87% 0%
PEAK HR FACTOR 0.333 0.000 0.500 0.625 0.750
APP/DEPART 4 / 0 0 / 2 2 / 6 15 / 13 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 0 0 0 0 0 0 0 0 0 1 5 0 6 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
7:45 AM 1 0 0 0 0 0 0 2 0 0 2 0 5 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
8:15 AM 1 0 0 0 0 0 0 0 0 0 1 0 2 0 0 0 0 0
8:30 AM 1 0 0 0 0 0 0 1 0 0 3 0 5 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
VOLUMES 3 0 0 0 0 0 0 5 0 1 19 0 28 0 0 0 0 0
APPROACH % 100% 0% 0% 0% 0% 0% 0% 100% 0% 5% 95% 0%
APP/DEPART 3 / 0 0 / 1 5 / 5 20 / 22 0

BEGIN PEAK HR
VOLUMES 2 0 0 0 0 0 0 2 0 0 7 0 11 0 0 0 0
APPROACH % 100% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.500 0.000 0.250 0.875 0.550
APP/DEPART 2 / 0 0 / 0 2 / 2 7 / 9 0
4:00 PM 0 0 0 0 0 0 0 1 0 0 2 0 3 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 1 0 2 0 0 0 0 0
4:30 PM 0 0 1 0 0 0 0 1 0 0 0 0 2 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 2 0 0 3 0 5 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
VOLUMES 0 0 1 0 0 0 0 5 0 0 9 0 15 0 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 0% 100% 0%
APP/DEPART 1 / 0 0 / 0 5 / 6 9 / 9 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 2 0 0 4 0 6 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.000 0.250 0.333 0.300
APP/DEPART 0 / 0 0 / 0 2 / 2 4 / 4 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►

TRUCKS OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 0 0 0 0 0 0 0 2 0 0 2 0 4 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 1 0 0 5 0 6 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 2 0 2 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 6 0 0 10 0 16 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
APP/DEPART 0 / 0 0 / 0 6 / 6 10 / 10 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 1 0 0 3 0 4 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 100% 0% 0% 100% 0%
PEAK HR FACTOR 0.000 0.000 0.250 0.375 0.500
APP/DEPART 0 / 0 0 / 0 1 / 1 3 / 3 0
4:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 1 0 2 0 3 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 2 0 0 1 0 3 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 1 0 1 0 2 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 4 2 0 6 0 12 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 67% 33% 0% 100% 0%
APP/DEPART 0 / 0 0 / 2 6 / 4 6 / 6 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 1 0 3 0 4 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 100% 0% 100% 0%
PEAK HR FACTOR 0.000 0.000 0.250 0.750 0.500
APP/DEPART 0 / 0 0 / 1 1 / 0 3 / 3 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 5: NOTES: AM ▲

RV PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.000 0.000
APP/DEPART 0 / 0 0 / 0 0 / 0 0 / 0 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Harvest Creek Rd LOCATION #: 9
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 6: NOTES: AM ▲
PM N
BUSES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 0 X 0 X X X X 2 0 1 2 X
7:00 AM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 2 0 0 0 0 2 0 0 0 0 0
7:30 AM 2 0 0 0 0 0 0 0 0 1 2 0 5 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
8:00 AM 0 0 2 0 0 0 0 4 1 1 1 0 9 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 3 0 0 0 0 3 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
VOLUMES 2 0 2 0 0 0 0 10 1 2 4 0 21 0 0 0 0 0
APPROACH % 50% 0% 50% 0% 0% 0% 0% 91% 9% 33% 67% 0%
APP/DEPART 4 / 0 0 / 3 11 / 12 6 / 6 0

BEGIN PEAK HR
VOLUMES 2 0 2 0 0 0 0 8 1 2 3 0 18 0 0 0 0
APPROACH % 50% 0% 50% 0% 0% 0% 0% 89% 11% 40% 60% 0%
PEAK HR FACTOR 0.500 0.000 0.450 0.417 0.500
APP/DEPART 4 / 0 0 / 3 9 / 10 5 / 5 0
4:00 PM 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 1 1 0 2 0 0 0 0 0
5:45 PM 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0
VOLUMES 0 0 2 0 0 0 0 1 0 1 2 0 6 0 0 0 0 0
APPROACH % 0% 0% 100% 0% 0% 0% 0% 100% 0% 33% 67% 0%
APP/DEPART 2 / 0 0 / 1 1 / 3 3 / 2 0

BEGIN PEAK HR
VOLUMES 0 0 0 0 0 0 0 0 0 1 1 0 2 0 0 0 0
APPROACH % 0% 0% 0% 0% 0% 0% 0% 0% 0% 50% 50% 0%
PEAK HR FACTOR 0.000 0.000 0.000 0.250 0.250
APP/DEPART 0 / 0 0 / 1 0 / 0 2 / 1 0
Harvest Creek Rd

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Harvest Creek Rd
,o

U-TURNS
Harvest Creek Rd Harvest Creek Rd Brimhall Rd Brimhall Rd AM 7:30 AM PM
4:45 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
E J
E J
•l
T020624
DATE: LOCATION: PROJECT #: SC5147
Thu, Feb 20, 25 NORTH & SOUTH: LOCATION #: 10
EAST & WEST: CONTROL: SIGNAL
NOTES: AM ▲
PM N
MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 2 2 2 2 1 0 0 0 0
7:00 AM 19 115 8 22 198 15 17 55 57 17 35 31 589 0 0 0 0 0 7:15 AM 27 123 17 30 256 26 26 37 55 13 44 44 698 0 1 0 0 1 7:30 AM 40 188 23 35 252 28 27 66 61 26 63 54 863 0 0 0 3 3 7:45 AM 70 255 40 93 319 34 42 98 79 44 62 63 1,199 0 2 0 4 6 8:00 AM 53 199 30 77 276 35 59 81 69 25 93 65 1,062 1 1 0 1 3 8:15 AM 50 201 33 34 261 37 38 81 66 32 75 40 948 0 2 0 1 3 8:30 AM 46 201 32 30 218 17 45 74 70 16 49 41 839 1 2 0 7 10 8:45 AM 38 212 27 34 180 19 33 54 31 26 59 31 744 2 3 0 4 9 VOLUMES 343 1,494 210 355 1,960 211 287 546 488 199 480 369 6,977 4 11 0 20 35 APPROACH % 17% 73% 10% 14% 77% 8% 22% 41% 37% 19% 45% 35% APP/DEPART 2,051 / 2,161 2,537 / 2,651 1,321 / 1,131 1,068 / 1,034 0

BEGIN PEAK HR
VOLUMES 213 843 126 239 1,108 134 166 326 275 127 293 222 4,087 1 5 0 9 APPROACH % 18% 71% 11% 16% 75% 9% 22% 43% 36% 20% 45% 34% PEAK HR FACTOR 0.810 0.829 0.876 0.885 0.848
APP/DEPART 1,183 / 1,236 1,486 / 1,511 767 / 700 651 / 640 0 4:00 PM 63 318 34 54 295 36 25 53 43 38 88 54 1,101 1 5 1 4 11 4:15 PM 35 320 36 48 257 30 42 63 38 35 74 76 1,054 6 4 0 4 14 4:30 PM 52 312 35 50 287 39 35 50 27 39 81 53 1,060 6 2 0 4 12 4:45 PM 44 284 28 49 246 33 47 35 29 37 84 88 1,004 6 4 0 3 13 5:00 PM 58 340 28 57 334 35 27 54 39 41 78 79 1,170 3 2 2 2 9 5:15 PM 50 328 36 53 312 32 43 61 35 44 88 66 1,148 2 4 1 4 11 5:30 PM 49 321 23 44 275 45 58 65 46 31 91 62 1,110 1 0 0 2 3 5:45 PM 50 328 21 48 306 30 42 38 39 39 77 68 1,086 1 1 0 4 6 VOLUMES 401 2,551 241 403 2,312 280 319 419 296 304 661 546 8,812 26 22 4 27 79 APPROACH % 12% 79% 7% 13% 77% 9% 31% 40% 29% 20% 43% 36% APP/DEPART 3,219 / 3,438 3,017 / 2,938 1,038 / 1,090 1,538 / 1,346 0

BEGIN PEAK HR
VOLUMES 207 1,317 108 202 1,227 142 170 218 159 155 334 275 4,543 7 7 3 12 APPROACH % 13% 80% 7% 13% 78% 9% 31% 40% 29% 20% 43% 35% PEAK HR FACTOR 0.955 0.922 0.814 0.960 0.963
APP/DEPART 1,639 / 1,769 1,578 / 1,548 550 / 540 776 / 686 0 Calloway Dr

NORTH LEG
Brimhall Rd WEST LEG EAST LEG Brimhall Rd

SOUTH LEG
Calloway Dr

N LEG S LEG E LEG W LEG TOTAL N LEG S LEG E LEG W LEG TOTAL NL SL EL WL TOTAL 7:00 AM 0 0 1 1 2 0 0 0 0 0 0 0 1 1 2
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 2 1 0 3 0 2 1 0 3 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 1 1 0 2 0 1 0 0 1 0 0 1 0 1
8:15 AM 0 2 1 0 3 0 1 1 0 2 0 1 0 0 1
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 1 0 0 0 1 1 0 0 0 1 0 0 0 0 0
TOTAL 1 5 4 1 11 1 4 2 0 7 0 1 2 1 4
4:00 PM 0 0 1 0 1 0 0 0 0 0 0 0 1 0 1
4:15 PM 0 1 1 0 2 0 0 0 0 0 0 1 1 0 2
4:30 PM 0 1 1 0 2 0 1 0 0 1 0 0 1 0 1
4:45 PM 0 2 0 1 3 0 2 0 1 3 0 0 0 0 0
5:00 PM 1 1 3 0 5 1 1 2 0 4 0 0 1 0 1
5:15 PM 0 1 0 1 2 0 0 0 0 0 0 1 0 1 2
5:30 PM 0 4 1 0 5 0 0 0 0 0 0 4 1 0 5
5:45 PM 1 0 0 2 3 1 0 0 1 2 0 0 0 1 1
TOTAL 2 10 7 4 23 2 4 2 2 10 0 6 5 2 13

U-TURNS
Calloway Dr Calloway Dr Brimhall Rd Brimhall Rd

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
Bakersfield
Calloway Dr
Brimhall Rd

BICYCLE & SCOOTER CROSSINGS AM PM AM
7:30 AM PM
5:00 PM
ALL PED + BIKE & SCOOTER PEDESTRIAN CROSSINGS
[ ]
[ ]
5,554 491 4,272 758 TOTAL 5,599
3,017 280 2,312 403 PM 3,438
2,537 211 1,960 355 AM 2,161 1,068 1,538 2,606 2,380 1,346 1,034 369 546 915 480 661 1,141 TOTAL PMAM199 304 503 606 319 287 AMPM TOTAL 965 419 546 784 296 488 1,131 1,090 2,221 2,359 1,038 1,321 2,651 AM 343 1,494 210 2,051
2,938 PM 401 2,551 241 3,219
5,589 TOTAL 744 4,045 451 5,270
3,064 276 2,335 441 TOTAL 3,005
1,578 142 1,227 202 PM 1,769
1,486 134 1,108 239 AM 1,236 651 776 1,427 1,326 686 640 222 275 497 293 334 627 TOTAL PMAMAM 7:30 AM 8:45 AM 127 155 282 336 170 166
#N/A AMPM TOTAL 544 218 326 PM 5:00 PM
3:45 PM 434 159 275 700 540 1,240 1,317 550 767
1,511 AM 213 843 126 1,183
1,548 PM 207 1,317 108 1,639
3,059 Total 420 2,160 234 2,822
Calloway Dr
AimTD LLC

TURNING MOVEMENT COUNTS
Calloway Dr Brimhall RdBrimhall RdALL HOURS
Calloway Dr
Calloway Dr Brimhall RdBrimhall Rd

PEAK HOUR
Bakersfield
SC5147
I I I ] [ ] A A A
(
•)
< A CP
V V [ ] [ I I I
I I I ] [ ] A A A
1 C
•)
< A CP
V V [ ] [ I I I ]
[
[
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Calloway Dr LOCATION #: 10
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
NOTES: AM ▲
PCE Class 1 2 3 4 5 6 PM N
Adjusted Factor 1 1.5 2 3 2 2 MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 2 2 2 2 1
7:00 AM 22 130 9 22 215 15 17 60 58 18 44 35 643 0
7:15 AM 36 128 17 34 271 28 30 37 57 13 48 45 742 0
7:30 AM 41 193 23 36 264 31 27 68 66 28 68 58 900 0
7:45 AM 72 264 41 95 326 37 46 101 85 45 63 64 1,237 0
8:00 AM 58 208 30 79 296 37 60 86 69 25 96 68 1,110 0
8:15 AM 51 215 34 35 274 38 40 83 73 33 78 41 993 0
8:30 AM 47 212 32 34 227 17 48 77 75 18 51 44 881 0
8:45 AM 43 229 28 38 192 20 38 54 34 27 66 32 799 0
VOLUMES 369 1,578 214 372 2,063 221 305 564 515 206 513 386 7,303 0 0 0 0 0 APPROACH % 17% 73% 10% 14% 78% 8% 22% 41% 37% 19% 46% 35% APP/DEPART 2,160 / 2,268 2,656 / 2,784 1,383 / 1,149 1,105 / 1,103 0

BEGIN PEAK HR
VOLUMES 222 880 128 245 1,159 142 172 336 292 131 305 231 4,239 APPROACH % 18% 72% 10% 16% 75% 9% 22% 42% 36% 20% 46% 35% PEAK HR FACTOR 0.815 0.844 0.867 0.883 0.857
APP/DEPART 1,230 / 1,282 1,545 / 1,581 800 / 709 666 / 668 0 4:00 PM 68 326 34 58 303 38 26 57 46 38 93 55 1,140 0
4:15 PM 37 324 36 49 267 31 42 67 39 35 76 79 1,079 0
4:30 PM 53 318 35 52 293 41 35 55 27 39 83 55 1,084 0
4:45 PM 46 293 28 49 251 33 48 35 30 37 85 89 1,021 0
5:00 PM 64 348 28 57 340 35 28 56 40 41 79 83 1,198 0
5:15 PM 50 331 37 56 317 32 43 63 36 44 93 67 1,167 0
5:30 PM 55 324 23 45 279 46 60 67 50 31 94 63 1,134 0
5:45 PM 50 337 22 48 312 30 42 42 39 40 78 70 1,107 0
VOLUMES 422 2,598 242 412 2,360 285 323 440 306 305 680 558 8,928 0 0 0 0 0 APPROACH % 13% 80% 7% 13% 77% 9% 30% 41% 29% 20% 44% 36% APP/DEPART 3,262 / 3,479 3,057 / 2,970 1,068 / 1,094 1,542 / 1,386 0

BEGIN PEAK HR
VOLUMES 219 1,339 109 205 1,247 143 173 227 165 156 344 282 4,605 APPROACH % 13% 80% 7% 13% 78% 9% 31% 40% 29% 20% 44% 36% PEAK HR FACTOR 0.947 0.924 0.800 0.956 0.961
APP/DEPART 1,667 / 1,793 1,595 / 1,567 564 / 541 781 / 705 0 Calloway Dr

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Calloway Dr AM
7:30 AM PM
5:00 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]

U-TURNS
Calloway Dr Calloway Dr Brimhall Rd Brimhall Rd
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Calloway Dr LOCATION #: 10
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 1: NOTES: AM ▲

PASSENGER PM N
VEHICLES MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 2 2 2 2 1
7:00 AM 17 100 7 22 182 15 17 52 56 16 28 28 540 0 0 0 0 0 7:15 AM 20 120 17 26 242 24 24 37 53 13 37 43 656 0 1 0 0 1 7:30 AM 39 183 23 34 238 25 27 63 56 24 59 50 821 0 0 0 3 3 7:45 AM 67 243 39 91 313 32 39 95 75 42 61 61 1,158 0 2 0 3 5 8:00 AM 49 187 30 75 257 33 57 76 69 25 90 63 1,011 1 1 0 1 3 8:15 AM 48 188 31 33 243 36 36 79 61 30 73 38 896 0 2 0 1 3 8:30 AM 45 191 32 24 207 17 41 70 64 13 47 37 788 1 2 0 6 9 8:45 AM 34 193 26 31 164 18 30 54 28 24 53 29 684 2 3 0 3 8 VOLUMES 319 1,405 205 336 1,846 200 271 526 462 187 448 349 6,586 4 11 0 17 32 APPROACH % 17% 73% 11% 14% 77% 8% 22% 42% 37% 19% 45% 35% APP/DEPART 1,933 / 2,036 2,393 / 2,499 1,259 / 1,084 1,001 / 967 0

BEGIN PEAK HR
VOLUMES 203 801 123 233 1,051 126 159 313 261 121 283 212 3,900 1 5 0 8 APPROACH % 18% 71% 11% 16% 74% 9% 22% 43% 36% 19% 45% 34% PEAK HR FACTOR 0.808 0.808 0.877 0.872 0.838
APP/DEPART 1,128 / 1,177 1,415 / 1,434 733 / 677 624 / 612 0 4:00 PM 58 309 34 49 285 35 24 50 39 38 84 52 1,057 1 5 1 4 11 4:15 PM 33 315 36 47 246 29 42 60 36 35 72 74 1,025 6 4 0 4 14 4:30 PM 50 305 35 49 279 37 35 47 27 39 78 50 1,031 6 2 0 4 12 4:45 PM 42 276 28 49 239 33 46 35 28 37 83 87 983 6 4 0 3 13 5:00 PM 54 330 28 57 327 35 26 53 38 41 76 76 1,141 3 2 2 2 9 5:15 PM 50 326 35 50 306 32 43 59 33 44 84 64 1,126 2 4 1 4 11 5:30 PM 45 318 23 43 268 44 57 62 42 31 86 61 1,080 1 0 0 2 3 5:45 PM 50 322 20 48 301 30 42 34 39 38 76 66 1,066 1 1 0 4 6 VOLUMES 382 2,501 239 392 2,251 275 315 400 282 303 639 530 8,588 26 22 4 27 79 APPROACH % 12% 79% 8% 13% 77% 9% 31% 40% 28% 20% 43% 35% APP/DEPART 3,148 / 3,368 2,940 / 2,862 1,001 / 1,058 1,499 / 1,300 0

BEGIN PEAK HR
VOLUMES 199 1,296 106 198 1,202 141 168 208 152 154 322 267 4,442 7 7 3 12 APPROACH % 12% 81% 7% 13% 78% 9% 32% 39% 29% 20% 43% 35% PEAK HR FACTOR 0.969 0.919 0.825 0.963 0.966
APP/DEPART 1,608 / 1,738 1,548 / 1,515 531 / 524 755 / 665 0 Calloway Dr

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Calloway Dr

U-TURNS
Calloway Dr Calloway Dr Brimhall Rd Brimhall Rd AM
7:30 AM PM
5:00 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Calloway Dr LOCATION #: 10
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 2: NOTES: AM ▲
2-AXLE PM N
WORK MD ◄ W E ►

VEHICLES/ OTHER S
TRUCKS OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 2 2 2 2 1
7:00 AM 1 8 0 0 6 0 0 1 1 1 2 0 20 0 0 0 0 0
7:15 AM 0 1 0 2 5 1 0 0 1 0 6 1 17 0 0 0 0 0
7:30 AM 0 3 0 1 10 1 0 3 3 1 0 0 22 0 0 0 0 0
7:45 AM 2 8 0 0 3 0 1 1 1 2 1 2 21 0 0 0 0 0
8:00 AM 2 8 0 0 11 1 2 1 0 0 0 1 26 0 0 0 0 0
8:15 AM 2 6 2 0 15 1 1 1 1 2 0 2 33 0 0 0 0 0
8:30 AM 1 4 0 4 8 0 2 2 2 2 0 3 28 0 0 0 1 1
8:45 AM 0 13 1 1 10 1 0 0 2 2 3 2 35 0 0 0 1 1
VOLUMES 8 51 3 8 68 5 6 9 11 10 12 11 204 0 0 0 2 2
APPROACH % 13% 82% 5% 10% 84% 6% 23% 35% 42% 29% 34% 31% APP/DEPART 62 / 68 81 / 89 26 / 22 35 / 25 0

BEGIN PEAK HR
VOLUMES 6 25 2 1 39 3 4 6 5 5 1 5 102 0 0 0 0
APPROACH % 18% 76% 6% 2% 91% 7% 27% 40% 33% 45% 9% 45%
PEAK HR FACTOR 0.825 0.672 0.625 0.550 0.773
APP/DEPART 33 / 34 43 / 49 15 / 9 11 / 10 0
4:00 PM 2 6 0 3 6 0 1 1 3 0 1 2 25 0 0 0 0 0
4:15 PM 1 3 0 1 8 1 0 1 2 0 1 1 19 0 0 0 0 0
4:30 PM 2 5 0 0 5 1 0 0 0 0 2 3 18 0 0 0 0 0
4:45 PM 1 3 0 0 5 0 1 0 1 0 0 1 12 0 0 0 0 0
5:00 PM 0 6 0 0 5 0 1 0 0 0 2 1 15 0 0 0 0 0
5:15 PM 0 1 1 1 4 0 0 1 2 0 0 2 12 0 0 0 0 0
5:30 PM 0 1 0 1 6 1 0 3 1 0 4 1 18 0 0 0 0 0
5:45 PM 0 1 1 0 1 0 0 3 0 1 1 1 9 0 0 0 0 0
VOLUMES 6 26 2 6 40 3 3 9 9 1 11 12 128 0 0 0 0 0
APPROACH % 18% 76% 6% 12% 82% 6% 14% 43% 43% 4% 46% 50% APP/DEPART 34 / 41 49 / 50 21 / 17 24 / 20 0

BEGIN PEAK HR
VOLUMES 0 9 2 2 16 1 1 7 3 1 7 5 54 0 0 0 0
APPROACH % 0% 82% 18% 11% 84% 5% 9% 64% 27% 8% 54% 38%
PEAK HR FACTOR 0.458 0.594 0.688 0.650 0.750
APP/DEPART 11 / 15 19 / 20 11 / 11 13 / 8 0
Calloway Dr

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Calloway Dr

U-TURNS
Calloway Dr Calloway Dr Brimhall Rd Brimhall Rd AM
7:30 AM PM
5:00 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Calloway Dr LOCATION #: 10
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 3: NOTES: AM ▲
3-AXLE PM N
TRUCKS MD ◄ W E ►

OTHER S
OTHER ▼

NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND

NL NT NR SL ST SR EL ET ER WL WT WR TOTAL NB SB EB WB TTL LANES: 2 3 1 2 3 1 2 2 2 2 2 1
7:00 AM 0 1 0 0 3 0 0 0 0 0 2 1 7 0 0 0 0 0
7:15 AM 4 0 0 0 4 0 0 0 0 0 1 0 9 0 0 0 0 0
7:30 AM 1 1 0 0 1 0 0 0 1 1 3 0 8 0 0 0 0 0
7:45 AM 1 2 0 0 0 0 0 2 1 0 0 0 6 0 0 0 0 0
8:00 AM 0 1 0 0 1 0 0 0 0 0 2 0 4 0 0 0 0 0
8:15 AM 0 2 0 1 0 0 1 1 1 0 1 0 7 0 0 0 0 0
8:30 AM 0 2 0 1 1 0 2 2 2 1 2 1 14 0 0 0 0 0
8:45 AM 3 1 0 1 5 0 1 0 0 0 1 0 12 0 0 0 0 0
VOLUMES 9 10 0 3 15 0 4 5 5 2 12 2 67 0 0 0 0 0
APPROACH % 47% 53% 0% 17% 83% 0% 29% 36% 36% 13% 75% 13% APP/DEPART 19 / 16 18 / 22 14 / 8 16 / 21 0

BEGIN PEAK HR
VOLUMES 2 6 0 1 2 0 1 3 3 1 6 0 25 0 0 0 0
APPROACH % 25% 75% 0% 33% 67% 0% 14% 43% 43% 14% 86% 0% PEAK HR FACTOR 0.667 0.750 0.583 0.438 0.781
APP/DEPART 8 / 7 3 / 6 7 / 4 7 / 8 0
4:00 PM 1 1 0 0 1 0 0 1 1 0 2 0 7 0 0 0 0 0
4:15 PM 1 2 0 0 0 0 0 1 0 0 1 0 5 0 0 0 0 0
4:30 PM 0 1 0 0 3 0 0 1 0 0 1 0 6 0 0 0 0 0
4:45 PM 1 2 0 0 2 0 0 0 0 0 0 0 5 0 0 0 0 0
5:00 PM 2 3 0 0 0 0 0 0 1 0 0 1 7 0 0 0 0 0
5:15 PM 0 0 0 2 1 0 0 1 0 0 3 0 7 0 0 0 0 0
5:30 PM 0 2 0 0 1 0 0 0 1 0 0 0 4 0 0 0 0 0
5:45 PM 0 2 0 0 3 0 0 0 0 0 0 1 6 0 0 0 0 0
VOLUMES 5 13 0 2 11 0 0 4 3 0 7 2 47 0 0 0 0 0
APPROACH % 28% 72% 0% 15% 85% 0% 0% 57% 43% 0% 78% 22%
APP/DEPART 18 / 15 13 / 14 7 / 6 9 / 12 0

BEGIN PEAK HR
VOLUMES 2 7 0 2 5 0 0 1 2 0 3 2 24 0 0 0 0
APPROACH % 22% 78% 0% 29% 71% 0% 0% 33% 67% 0% 60% 40%
PEAK HR FACTOR 0.450 0.583 0.750 0.417 0.857
APP/DEPART 9 / 9 7 / 7 3 / 3 5 / 5 0
Calloway Dr

NORTH SIDE
Brimhall Rd WEST SIDE EAST SIDE Brimhall Rd

SOUTH SIDE
Calloway Dr

U-TURNS
Calloway Dr Calloway Dr Brimhall Rd Brimhall Rd AM
7:30 AM PM
5:00 PM

INTERSECTION TURNING MOVEMENT COUNTS
PREPARED BY: AimTD LLC. tel: 714 253 7888 [email protected]
DATE: LOCATION: Bakersfield PROJECT #: SC5147
2/20/25 NORTH & SOUTH: Calloway Dr LOCATION #: 10
THURSDAY EAST & WEST: Brimhall Rd CONTROL: SIGNAL
CLASS 4: NOTES: AM ▲
4 OR MORE PM N
AXLE MD ◄ W E ►