kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Purpose: Calculate the retention basin size for the proposed Riverview Market site located at the southwest corner of Rosedale and Coffee Rd, Bakersfield, CA in Kern County.

Approach: Utilize the City of Bakersfield Standards for determining size of basin. a. Analyze the volume from a 100-year, 24-hour storm event to determine retention basin requirements.
b. Size the basins to be able to retain the volumes while provided the required 1’ of freeboard.
c. Size the pipes to adequately convey the 100-year peak flow rate obtained from the rational method.

Assumptions: The following information was assumed to apply to this study:
a. Areas for runoff calculations are shown in the data table on page 3 and Attachment A.
b. Capacity requirements are designed per City of Bakersfield Public works section

3.7.2.1, Retention Basins per 24-hr, 100-year storm event c. The runoff coefficients used as follows:
a. 0.15 for pervious areas.
b. 0.95 for impervious areas.
ܣ ∗ ݅ ∗ ܥ = ܳ (ܣ ∗ ܥ)∑ ∗ 0.15 = ܸ :Calculation
KimleyHorn

Page 3 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Calculations
Runoff Volume
Total Area (SF) Land Type Runoff Coefficient*
DMA A 2,031,887 Pavement/Landscape 0.79
*DMA A Runoff Coefficient is a weighted average of the pavement and landscape areas.

Runoff Volume,ܸ = 0.15 ∗෍(ܥ ∗ ܣ(
ܸ = 0.15 ∗෍(0.79 ∗ 2,031,887)
Runoff Volume = 241,405 ft3 or 5.54 Acre-Feet
V is the design volume from a 100-year, 24-hour storm event C is the runoff coefficient from D-2 of the City of Bakersfield Hydrology Manual A is the drainage area
Basin Stage Storage
Description Elevation (ft) Surface Area (SF) Volume (CF) Bottom of Basin 372.0 16,301 0
WQ WSE 384.0 30,560 276,941
Top of Basin 385.0 31,985 308,232
KimleyHorn

Page 4 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Peak Flow Rate Calculations
DA Area (SF) Area (AC) Pervious
Area (SF)
Runoff
Coefficient Flow Rate (CFS)
A1 104,603 2.40 28128 0.73 4.85
A2 77,887 1.79 24970 0.69 3.41
A2.1 114,633 2.63 28580 0.75 5.43
A3 251,431 5.77 130902 0.53 8.47
A3.1 142,293 3.27 40089 0.72 6.51
A3.2 37,460 0.86 3765 0.87 2.06
A4 9,185 0.21 1400 0.83 0.48
A5 41,718 0.96 6118 0.83 2.19
A6 36,345 0.83 7216 0.79 1.82
A7 57,865 1.33 3296 0.90 3.30
A8 85,751 1.97 20220 0.76 4.12
A9 55,353 1.27 10217 0.80 2.80
A10 56,846 1.31 10133 0.81 2.90
A11 77,541 1.78 20223 0.74 3.63
A12 368,166 8.45 18579 0.91 21.14
A12.1 347,921 7.99 18580 0.91 19.93
A13 55,935 1.28 11155 0.79 2.79
A14 56,162 1.29 10621 0.80 2.83
A15 54,792 1.26 6965 0.85 2.93
Total 2,031,887 34.83 353,836 0.79 101.60
*DMA A Runoff Coefficient is a weighted average of the pavement and landscape areas.

KimleyHorn

Page 5 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Pipe Sizing
Node
Flow
Rate
(cfs)
Pipe Size (in) Capacity
(cfs)
1 to 2 8.26 24 16.00
2 to 3 17.10 30 29.00
3 to Basin 25.57 30 29.00
4 to 5 4.12 15 4.57
5 to 6 39.61 36 47.16
6 to 7 41.80 36 47.16
7 to 8 43.62 36 47.16
8 to 9 46.45 36 47.16
9 to 10 46.93 36 47.16
10 to Basin 55.40 42 71.14
11 to 12 21.14 30 29.00
12 to 13 23.93 30 29.00
13 to 14 27.56 30 29.00
14 to 15 30.37 36 47.16
15 to 5 37.79 30 29.00
16 to 17 20.41 30 29.00
17 to 9 41.55 42 71.14
18 to 10 8.47 24 16.00
ܣ ∗ ݅ ∗ ܥ = ܳ
Q is the peak flow rate
C is the runoff coefficient from D-2 of the City of Bakersfield Hydrology Manual i is the intensity from the IDF Curve D-1 of the City of Bakersfield Hydrology Manual A is the drainage area
Summary: Based on the calculations shown above, the total runoff volume is 241,405 ft3 (5.54 acre-feet) for a 100-year, 24-hour storm event. Using the prismoidal method, the proposed retention basin has a total storage volume of 308,232 ft3 (7.07 acre-feet). The maximum water surface elevation is determined to be 384.00 ft, and the top of the basin is 385.00 ft, therefore there is 1.0 ft of freeboard.

Between all the proposed catch basins, the lowest inlet elevation is 387 feet, which is about 1.0 ft higher than the top of the basin. This shows that the basin has an adequate capacity to handle the expected runoff.

KimleyHorn

Page 6 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT A
Hydrology Manual References
Kimley»Horn

2.75 10

0.10 .2 .3 .4 .5 .6.7.8.9 1.00 2 3

INTENSITY-INCHES PER HOUR
FILENAME: D-1 INTENSITY VS DURATION CURVES
DATE
11/20

STANDARD DRAWN
SCALE

APPROVED
D-1

CITY ENGINEER PUBLIC WORKS DEPARTMENT
10—

0.010
KDB

CHECKED
TW

CITY OF BAKERSFIELD

CALIFORNIA
INTENSITY VS. DURATION
CURVES N.T.S.

SHEET NO.

0.010 0.10 .2 .3 .4 .5 .6.7.8.9 1.00 2 3
O) CO P (o in
CAI N Oy
G (1
V
N

G M) I L

DURA TION
G
O
N
O

MINUTES
N
HOURS
N

CITY OF BAKERSFIELD

RATIONAL METHOD

URBAN RUNOFF COEFFICIENTS (C)
TYPE OF DEVELOPMENT (Includes Street Area)
Sandy Soil Heavy Soil
Parks undeveloped
SURFACE TYPE (For Composites)
LAWNS & LANDSCAPED AREAS Sandy Soil Heavy Soil
FILENAME: D-2 RATIONAL METHOD URBAN RUNOFF COEFFICIENTS DATE
11/20
APPROVED ATN’E 1
1 D-2

CITY ENGINEERPUBLIC WORKS DEPARTMENT

0.95 0.05
Grasslands
Grasslands
Grasslands
Grasslands
Sandy Soils - SCS Group A & B Soils
Heavy Soils - SCS Group C & D Soils
017

0.22 0.35

0.15 0.25

0.35 0.45

0.44 0.39

0.34 0.27

0.58 0.80

0.90 0.80

0.22 Type A Soil
Type B Soil
Type C Soil
Type D Soil

0.10 0.15

0.20 6,000 S.F.
7,500 SF.
10,000 SF.
15,000 SF
R-1
R-1
R-1
R-1
R-2
R-3, R-4, M-H
Commercial
Industrial

0.42 0.38

0.34 0.27

0.55 0.80

0.90 0.80

0.15 Soil groups for area in question can be determined by referring to http://websoilsurvey.sc.egov.usda.gov

STANDARD

RATIONAL METHOD

URBAN RUNOFF

COEFFICIENTS
Pavement, drives, and roofs
Backyards
Flat Slope, 2%
Average Slope, 2% to 7%
Steep Slope, 7%

CITY OF BAKERSFIELD

CALIFORNIA
N.T.S.

SHEET NO.

DRAWN
KDB

CHECKED
TW
SCALE

Page 7 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT B
Drainage Areas
Kimley»Horn

D T D D D T D T D T T T T D D D DD D D D

PICK-UP EV EV EV EV PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP DELIVERY DRIVER CARTS DRIVE
THRU
DRIVE
THRU
6U,T(A
RETAIL ±2,122 S.F.

SUITE D
FAST CASUAL REST. ±1,229 S.F.

SUITE B RETAIL ±1,411 S.F. SUITE C
RETAIL ±1,452 S.F.

SUITE E RETAIL ±1,357 S.F.

TP
TP
TP TP
TP
TP
TP
REST ±2,623 S.F. RETAIL ±2,241 S.F. RETAIL ±2,147 S.F.

DRIVE-THRU
RESTAURANT ±2,505 S.F. RETAIL ±2,487 S.F. MEDICAL OFFICE ±4,004 S.F.

TP TPDRIVE-THRU
RESTAURANT ±2,496 S.F. FAST CASUAL RESTAURANT
2,874 S.F.

FAST CASUAL RESTAURANT
2,677 S.F.

RETAIL
/FAST CASUAL REST. ±2,400 S.F.

RETAIL ±1,920 S.F. RETAIL ±2,400 S.F. RETAIL ±2,400 S.F. RETAIL /FAST CASUAL REST. ±2,400 S.F.

RETAIL
/FAST CASUAL REST. ±2,400 S.F.

RETAIL ±2,480 S.F. RETAIL ±2,500 S.F.

ROSEDALE HWY EL TORO VIEJO RD COFFEE RDROSEDALE HWY ROSEDALE HWY ROSEDALE HWY COFFEE RD COFFEE RD (NOT A PART)

MAJOR B
MARKET
34,971 SF
RESTAURANT ±7,818 S.F. STORAGE BLDG (±500 UNITS) ±40,000 SF SUITE A RETAIL ±2,122 S.F. SUITE B RETAIL ±1,411 S.F. SUITE C RETAIL ±1,452 S.F.

SUITE E RETAIL ±1,357 S.F.

DRIVE-THRU
RESTAURANT ±2,513 S.F. FAST CASUAL RESTAURANTS
±5,535 S.F.

DRIVE-THRU
RESTAURANT ±2,296 S.F. FAST CASUAL RESTAURANTS
±4,223 S.F.

REST ±2,400 S.F. RETAIL ±2,400 S.F. RETAIL ±2,200 S.F.

MAJOR D
RETAIL
10,000 SF

MAJOR I
RETAIL
25,013 SF

MAJOR G
RETAIL
15,562 SF

MAJOR H
RETAIL
19,221 SF

MAJOR E
RETAIL
25,047 SF

MAJOR J
14,176 SF

MAJOR F
RETAIL
18,012 SF
SUITE A RETAIL ±3,031 S.F. DT. REST ±1,720 S.F. SUITE B REST. ±1,844 S.F. SUITE C RETAIL ±1,520 S.F. SUITE D
REST. ±1,794 S.F.

RESTAURANT

RESTAURANT
RETAIL ±3,501 S.F. RETAIL ±2,646 S.F. RETAIL ±2,659 S.F. DRIVE-THRU RESTAURANT ±2,740 S.F.

FUTURE DEVELOPMENT BY OTHERS

FUTURE DEVELOPMENT BY OTHER

FUTURE DEVELOPMENT BY OTHER

FUTURE DEVELOPMENT BY OTHER

FUTURE DEVELOPMENT BY OTHER
RETAIL ±2,480 S.F. RETAIL ±2,500 S.F. RETAIL ±2,400 S.F. RETAIL ±2,400 S.F. RETAIL ±1,920 S.F. RETAIL/ FAST CASUAL REST. ±2,400 S.F.

RETAIL/ FAST CASUAL REST. ±2,400 S.F.RETAIL/ FAST CASUAL REST. ±2,400 S.F.

SUITE C
RETAIL ±1,229 S.F.

LEGEND ROSEDALE & COFFEE RD - RIVERVIEW MARKET
‹
FOR
REVIEW
ONLY #
NORTH

PROPOSED

HYDROLOGY EXHIBIT A
51 )
5 —
D
T
O
385=== - E30— os J9, —3 > —8=
9 Im O. 7.

U—
.—=NODE:1 I JIIUJT
C
/
86 treeTin
379.6FSL
n
I
*
-
) 38s A14 8 A5 TA7 L
)t
J
“9,A8
N

1.29 0.967% 0.83/
——NA

1.33 384 38 1.97
o
7 29 NODE,4 ।
j [NODE 2 TN
i > 14. —s
C 2378.7FS 4.l l;
NO 380. A 381.7A33
<
70 7\ —I —
7 l/AgH? ■ ’ l . ------ ---
G&EPARCEL NODE I 7000s O)r* 5.77 I “PE l
384.2!
.I
I
Jr
p
■ L | 91A1Z I A. UNg—l &7 N
$0)2/
N L
0 L
652J 21
7 381
I
V CN
J
1 ( 1OO)
U
(
3 N
W 1 Jr0)5 T/NT—1
1 100 TIIIN1
LC
WODE 1
(O RDO IN)) .NODE 3= re VI 0l
(
/
1 J I 386
5 385
I
8 19 384.9 FSA9)
N) . 4
0 I||

1.27 4 I (
LL
N
NKo | N) I to ) CO 03 _ J N) — N) Li *XXQN K. 38 4 —
I
r
(
O
7 N)
/ 10 CO I 1
O) v)V
i
O) I'l
N)
\
ly
[
1 T
)
\
E
1 —1
1 I
o
2) I 1 O)
Do I Lo)_
385.2 FS
1 —
-
s
7 —L
N ■ J CO
£
fl
/
V M ct T" IlHF '
t
X JH
O)
B■
.03’
4 U 1.28
lUei __2
f
Si
7 I -
7 ।
I
O
W (
/
11I
to
to
to
NODE 11
1387.7 FS
C C
A2.1

2.63 (
A3.2

0.86 A12

7.99 । A11

1.78 A3.1

3.27 4to
-A2

1.79 A12.1

8.45"
NODE16
388.2 FS
to
to
-A15-

1.26 —======== "X"
6137-===3
CO
00 to
Q-NODE 101
BASIN.5FS
378.3 FS
1395/

52. y
7/
i//
/J
f r
CO
N),
O
O)|
NODE8“9
387.6FS=388
L
EN) 0
=A4

0.21 A
A10—

1.30 ,
\
I'l
NODE12’
386.2 FS A13
393
2—
|
BASIN
378.3 FS
4 a ■

1.-382
■ “sm
nL
A6*
Ar r
382— Pl
‘SP-390.0FS [ 389 o FS —LE a
•aV<=N JV"
//00 7

1. 89
ANODE 132
•$385.0FS2
Lo
l_Y
389-
’ 3ss% (
Ial
-l
CO-V
(O0
to
1 1
‘ Un
8C
O)% 380.0FS 220550
<
384
{ —
\NODE14]
1 385.2 FS
A =75
+438233823
A1
4A7
%
r 00
00 CO
to to
0 )
|
oNODE 7
0386.0 FS —V ===
s3l D—
/
.00-/0 0
(O.'O
NN)
/ / / ■
to
to
4°
do
i 7
11 ,
1 if ca Tc M I I OTto
Mio to ,
NBE:5
3791
23 toO
&
-NODE 68
J 387.2IFS

PROPERTY LINE

CENTER LINE

EASEMENT OR SETBACK LINE

CIVIL LIMIT OF WORK LINE

PROPOSED STORM DRAIN

PROPOSED CATCH BASIN
Ip

GRAPHIC SCALE IN FEET
0 75 150 300 SHEET NUMBER
Know what's below.

Call 811 before you dig.

O

PROPOSED SIDE OPENING CATCH
BASIN

PROPOSED ABOVE GROUND

INFILTRATION BASIN
CO
»
CIVIL go
OF(RW
No. 81751
Exp. 3/31/28
ROFESS/0,
SVETGo— J
O

AREA RESERVED FOR

CITY APPROVAL STAMP

BAKERSFIELD BBG CHECKED BY
D,ML
DESIGNED BYlD,SL,MLDRAWN BY

AS SHOWN SCALE

KHA PROJECT
195445003
DATE
04/20/2026
WWW.KIMLEY-HORN.COM
714-939-1030 -HON-Kimley»Horn 2026 KIMLEY-HORN AND ASSOCIATES, INC. 1100 W TOWN AND COUNTRY ROAD,SUITE 700, ORANGE, CA 92868

BYDATEREVISIONS

Page 8 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT C
Runoff Volume Calculations
Kimley»Horn
6/2/25, 5:02 PM Precipitation Frequency Data Server
s*M5+,
47 v O a
Tan PC source: USGS

POINT PRECIPITATION FREQUENCY ESTIMATES
NOAA, National Weather Service, Silver Spring, Maryland PF tabular | PF graphical | Maps& aerials
PF tabular
Average recurrence interval years)
Duration
1 2 10 25 50 100 200 500 1000 5
5-min
10-min
15-min
30-min
60-min
2-hr
3-hr
6-hr
12-hr
24-hr
2-day
3-day
4-day
7-day
10-day
20-day
30-day
45-day
60-day
1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS).

Back to Top
PF graphical
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3816&lon=-119.0933&data=depth&units=english&series=pds 1/4 OHH
Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values.

Please refer to NOAA Atlas 14 document for more information.

0.403
(0.283-0.579)

0.577
(0.406-0.830)

0.698
(0.491-1.00)

0.956
(0.672-1.37)

1.35 (0.946-1.93)

1.50 (1.05-2.15)

1.71 (1.20-2.46)

2.14 (1.51-3.08)

2.80 (1.97-4.02)
3,91
(3.01-5.19)
476
(3.66-6.32)

5.13 (3.95-6.80)
533
(4.10-7.08)
558
(4.29-7.40)
579
(4.45-7.68)

7.02 (5.40-9.32)

8.25 (6.35-10.9)

10.1 (7.76-13.4)

11.5 (8.85-15.3)

0.192
(0.151-0.247)

0.276
(0.217-0.354)

0.333
(0.263-0.428)

0.457
(0.359-0.586)

0.643
(0.506-0.825)

0.837
(0.659-1.08)

0.978
(0.770-1.26)

1.24 (0.977-1.59)

1.55 (1.22-1.99)
2,03
(1.76-2.38)
2,38
(2.07-2.80)

2.56 (2.22-3.01)

2.72 (2.36-3.19)
3,03
(2.63-3.56)

3.26 (2.83-3.83)

4.08 (3.54-4.80)

4.81 (4.18-5.66)
587
(5.10-6.90)

6.69 (5.80-7.86)

0.075
(0.062-0.092)

0.108
(0.089-0.132)

0.130
(0.107-0.160)

0.178
(0.147-0.219)

0.251
(0.207-0.308)

0.350
(0.288-0.429)

0.413
(0.340-0.507)

0.518
(0.426-0.635)

0.606
(0.499-0.744)

0.742
(0.676-0.832)

0.864
(0.787-0.968)

0.931
(0.848-1.04)

0.992
(0.904-1.11)

1.12 (1.02-1.26)

1.22 (1.11-1.36)

1.52 (1.38-1.70)

1.78 (1.62-2.00)

2.19 (1.99-2.45)

2.51 (2.29-2.81)

0.309
(0.226-0.426)

0.443
(0.325-0.611)

0.536
(0.392-0.739)

0.734
(0.537-1.01)

1.03 (0.756-1.42)

1.27 (0.930-1.75)

1.46 (1.07-2.02)

1.84 (1.35-2.54)

2.37 (1.74-3.27)

3.24 (2.60-4.12)

3.90 (3.14-4.96)

4.20 (3.37-5.33)
440
(3.53-5.58)
470
(3.78-5.97)
494
(3.97-6.27)

6.07 (4.88-7.71)

7.15 (5.74-9.08)

8.74 (7.02-11.1)

9.96 (8.00-12.6)

0.549
(0.373-0.816)

0.787
(0.535-1.17)

0.952
(0.647-1.42)
430
(0.886-1.94)
483
(1.25-2.73)
485
(1.26-2.75)
492
(1.30-2.85)

2.39 (1.62-3.55)

3.15 (2.14-4.69)
448
(3.32-6.16)

5.50 (4.08-7.57)

5.94 (4.41-8.17)

6.14 (4.56-8.45)

6.30 (4.67-8.66)

6.47 (4.80-8.90)

7.77 (5.76-10.7)

9.11 (6.76-12.5)
141
(8.26-15.3)

12.7 (9.42-17.5)

0.125
(0.103-0.154)

0.179
(0.147-0.221)

0.217
(0.178-0.267)

0.297
(0.244-0.366)

0.418
(0.343-0.515)

0.567
(0.465-0.698)

0.667
(0.547-0.822)

0.846
(0.694-1.04)
403
(0.843-1.27)
430
(1.18-1.46)
451
(1.37-1.70)
463
(1.47-1.83)
474
(1.57-1.95)
497
(1.78-2.22)

2.14 (1.94-2.41)
2,70
(2.45-3.04)

3.18 (2.88-3.58)

3.88 (3.52-4.36)
4,42
(4.01-4.98)

0.096
(0.079-0.117)

0.137
(0.113-0.168)

0.166
(0.136-0.203)

0.227
(0.186-0.279)

0.319
(0.262-0.392)

0.440
(0.362-0.540)

0.519
(0.427-0.638)

0.656
(0.539-0.806)

0.782
(0.643-0.960)

0.972
(0.884-1.09)
413
(1.03-1.27)
421
(1.10-1.36)
429
(1.18-1.45)
447
(1.34-1.65)
460
(1.46-1.80)

2.02 (1.83-2.26)

2.37 (2.16-2.66)

2.90 (2.64-3.25)

3.31 (3.01-3.72)

0.227
(0.175-0.297)

0.325
(0.251-0.426)

0.394
(0.303-0.515)

0.539
(0.416-0.706)

0.758
(0.585-0.993)

0.970
(0.748-1.27)
413
(0.870-1.48)
443
(1.10-1.87)
480
(1.39-2.36)

2.39 (2.03-2.88)

2.83 (2.40-3.40)

3.04 (2.58-3.66)

3.22 (2.73-3.86)
3,54
(3.01-4.26)

3.78 (3.21-4.55)

4.72 (4.00-5.67)

5.56 (4.72-6.69)

6.80 (5.77-8.17)

7.74 (6.57-9.31)
44 0.152
(0.124-0.189)

0.218
(0.177-0.270)

0.263
(0.214-0.327)

0.361
(0.293-0.448)

0.507
(0.413-0.630)

0.677
(0.550-0.840)

0.795
(0.646-0.987)
401
(0.820-1.25)
424
(1.01-1.54)
459
(1.43-1.81)
486
(1.67-2.11)
zoo
(1.80-2.27)

2.13 (1.91-2.42)
2,40
(2.16-2.72)

2.60 (2.34-2.95)

3.27 (2.94-3.71)

3.86 (3.47-4.38)

4.70 (4.23-5.34)

5.36 (4.82-6.09)

0.266
(0.200-0.356)

0.381
(0.287-0.511)

0.460
(0.347-0.618)

0.630
(0.475-0.846)

0.887
(0.668-1.19)
411
(0.838-1.49)
429
(0.970-1.73)
463
(1.22-2.18)

2.08 (1.56-2.79)
2,79
(2.31-3.45)

3.33 (2.76-4.11)

3.58 (2.96-4.42)

3.77 (3.12-4.65)

4.10 (3.39-5.05)

4.34 (3.59-5.36)

5.38 (4.45-6.63)

6.34 (5.25-7.82)

7.75 (6.41-9.56)

8.83 (7.31-10.9)
NOAA Atlas 14, Volume 6, Version 2
Location name: Bakersfield, California, USA*
Sanja Perica, Sarah Dietz, Sarah Heim, Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra Pavlovic, Ishani Roy, Carl Trypaluk, Dale Unruh, Fenglin Yan, Michael Yekta, Tan Zhao, Geoffrey Bonnin, Daniel Brewer, Li-Chuan Chen, Tye Parzybok, John Yarchoan Latitude: 35.3816°, Longitude: -119.0933'
Elevation: 387 ft**
* source: ESRI Maps
PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 t PJ
Duration
2 E
E
in
6/2/25, 5:02 PM Precipitation Frequency Data Server
PDS-based depth-duration-frequency (DDF) curves
Latitude: 35.3816°, Longitude: -119.0933 0
12 10
8 6
4 2
0 12 -
10 8
6 -
4 2 +
0 T T T
1 100 200 500 1000
Average recurrence interval (years)
NOAA Atlas 14, Volume 6, Version 2 Created (GMT): Tue Jun 3 00:02:50 2025 Back to Top
Maps & aerials
Small scale terrain
https://hdsc.nws.noaa.gov/pfds/pfds printpage.html?lat=35.3816&lon=-119.0933&data=depth&units=english&series=pds —r-10
T
5 —r-25—r-50T
2 Duration
2/4
— 2-day
— 3-day
— 4-day
— 7-day
— 10-day
— 20-day
— 30-day
— 45-day
----- 60-day
— 5-min
— 10-min
15-min
— 30-min
— 60-min
— 2-hr
— 3-hr
— 6-hr
— 12-hr
— 24-hr
Average recurrence
interval
(years)
1 2
5 10
25 50
100
200
500
1000
2-hr3-hr
UIUJ-09
20-day30-day45-day60-day
7-day
10-day
2-day3-day4-day
10-min15-min
30-min
Precipitation depth (in) Precipitation depth (in)
\
1 r
। j
i
6/2/25, 5:02 PM Precipitation Frequency Data Server
1 / s
r- heTs
PKWY
C
f
I
• X
Hanford A
U
Delano c?
A
I kersfield
O ?
Lancaster
Lompoc ale Vi
Santa Clarita
Simi Valley g .-..Thousand-C ' Omi Rialto
Hanford
- (1a
V
Delano
- 06
I•.Ra kersfield
I
P
I
Santa Maria +
11 Lompoc ale Pal
C
■ -. .Thousand Rialto
Large scale aerial
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3816&lon=-119.0933&data=depth&units=english&series=pds 3/4 Santa Clarita
Sirni Valley .
- “T
x Atascadero
/San Luis
Obispo —
o’s
Lancaster
V 7 Porterville
Porterville—Ory
\ ’ -
3 km
2mi
Large scale map

SIERRA NEVADA DEATH VAI
100km Santa
I a Paula
60mi
Pal
58 I
Bakersfi
i
westsIDE
Large scale terrain

SIERRA NEVADA DEATH VAI
"l^ounls.^ Whitney OYns
Atascadero
ISan Luis
Obispo
i \
Santa Maria
a
76 s’Lake ' NATIO
V P
.SIERRA NEVAL.. . ..................

NAL9
100km Santa
a. Paula
6/2/25, 5:02 PM Precipitation Frequency Data Server

DA DEATH VAI
T
t Porterville
W Delano c?
1 I
•.Ra kersfield 1
I
9 I
Santa Maria 2
Lancaster
Lompoc Pal
VI lie
7 Simi Valley
•». .Thousand Rialto
Back to Top
Disclaimer
https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.3816&lon=-119.0933&data=depth&units=english&series=pds 4/4 Santa
a. Paula ■
Imdale
Santa Clarita 100km
gomi
, Atascadero
i San Luis
'. Obispo
US Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
National Water Center
1325 East West Highway
Silver Spring, MD 20910
Questions?: [email protected]
.SIERRA NEyAD^ ........ ....................
'
i
f^puntCr> ro ‘ Nc
Whaney
0^;Lake ( ate Hanford —
DMA Area (SF) Area (AC) Pervious
Area (SF)
Impervious
Area (SF)
Impervious
Ratio
Runoff
Coefficient D100-Yr, 24-Hr (In)* 100-Year, 24-HourRunoff Volume (CF) Runoff Volume
(AC-FT)
A 2,083,585 47.83 426810 1,656,775 0.80 0.79 2.79 380,825 8.74 Runoff Volume Calculations

Page 9 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT D
Proposed Basin Volume Calculations
Kimley»Horn
Perc Test 1 (in/hr) 1
Perc Test 2 (in/hr) 1
Avg. Perc Rate
(in/hr) 1.00
Bottom Area of
Basin (sf) 31,496
Volume of Basin (cf) 390,296
Drawdown (hr) 148.7
Drawdown (day) 6.2
Elevation Area (SF) Volume (CF) Cummulative Volume (CF) 376 31,496 0 0
377 33,683 32,583 32,583
378 35,901 34,786 67,369
379 38,151 37,020 104,390
380 40,433 39,286 143,676
381 44,738 42,567 186,244
382 47,852 46,286 232,530
383 50,997 49,416 281,946
384 54,175 52,578 334,524
385 57,385 55,772 390,296
386 60,626 58,998 449,294
Basin Drawdown
Stage Storage
Basin
Project: Rosedale
Basin Description:

Contour Contour Depth Incremental Cumulative Incremental Cumulative Elevation Area (ft) Volume Volume Volume Volume
(sq. ft) Avg. End Avg. End Conic Conic
(cu. ft) (cu. ft) (cu. ft) (cu. ft)
373.000 1,152.89 N/A N/A 0.00 N/A 0.00
374.000 24,919.64 1.000 13036.27 13036.27 10477.51 10477.51 375.000 34,119.23 1.000 29519.43 42555.70 29399.24 39876.75 376.000 35,676.62 1.000 34897.92 77453.62 34895.03 74771.78 377.000 37,265.16 1.000 36470.89 113924.52 36468.01 111239.79 378.000 38,884.86 1.000 38075.01 151999.53 38072.14 149311.93 379.000 40,535.70 1.000 39710.28 191709.81 39707.42 189019.35 380.000 42,217.69 1.000 41376.70 233086.50 41373.85 230393.20 381.000 43,930.84 1.000 43074.27 276160.77 43071.43 273464.62 382.000 45,675.13 1.000 44802.98 320963.75 44800.15 318264.78 383.000 47,450.57 1.000 46562.85 367526.60 46560.03 364824.81 384.000 36,591.64 1.000 42021.10 409547.71 41903.69 406728.50 385.000 3,003.75 1.000 19797.69 429345.40 16693.09 423421.59

Page 10 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT E
Peak Flow Rate Calculations
Kimley»Horn
DA Area (SF) Area (AC) Pervious
Area (SF)
Impervious
Area (SF) Pervious Ratio ImperviousRatio
Runoff
Coefficient
Flow Rate
(CFS)
Pipe Size
(in)
Pipe
Capacity
(CFS)
A1 38,726 0.89 7745 30,981 0.20 0.80 0.79 1.93 12.00 2.52 A2 82,545 1.89 16509 66,036 0.20 0.80 0.79 4.11 15.00 4.57 A3 273,361 6.28 54672 218,689 0.20 0.80 0.79 13.64 24.00 16.00 A4 122,657 2.82 24531 98,125 0.20 0.80 0.79 6.13 18.00 7.43 A5 280,369 6.44 56074 224,295 0.20 0.80 0.79 13.99 24.00 16.00 A6 142,757 3.28 28551 114,205 0.20 0.80 0.79 7.13 18.00 7.43 A7 305,906 7.02 61181 244,725 0.20 0.80 0.79 15.25 24.00 16.00 A8 252,176 5.79 50435 201,741 0.20 0.80 0.79 12.58 24.00 16.00 A9 221,611 5.09 44322 177,289 0.20 0.80 0.79 11.06 24.00 16.00 A10 177,333 4.07 35467 141,866 0.20 0.80 0.79 8.84 24.00 16.00 A11 121,844 2.80 24369 97,475 0.20 0.80 0.79 6.08 18.00 7.43 A12 64,301 1.48 12860 51,441 0.20 0.80 0.79 3.22 15.00 4.57 Total 2,083,585 47.85 416,717 1,666,868 0.20 0.80 0.79 103.95 48.00 101.57 Depth 100-Year (in) Time (min) Intensity (in/hr)
24-Hour 2.79 10 2.750
Peak Flow Rate Calculations
NOAA IDF Curve D-2

Page 11 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT F
Pipe Capacity Calculations
Kimley»Horn
Node
Flow
Rate
(cfs)
Pipe Size (in) Capacity
(cfs)
1 to 2 1.93 12 2.52
2 to 3 19.68 30 29.00
3 to
Basin 25.81 30 29.00
5 to 6 12.58 24 16.00
6 to 7 27.83 30 29.00
7 to 8 34.96 36 47.16
8 to 9 48.95 42 71.14
9 to 4 55.07 42 71.14
10 to
11 11.06 24 16.00
11 to
12 19.90 30 29.00
12 to 4 25.98 30 29.00
4 to
Basin 81.06 48 101.57
Pipe Sizing
Circular Pipe - 12"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 12.0 in
Diameter 12.0 in
Discharge 2.52 cfs
Results
Discharge 2.52 cfs
Normal Depth 12.0 in
Flow Area 0.8 ft²
Wetted Perimeter 3.1 ft
Hydraulic Radius 3.0 in
Top Width 0.00 ft
Critical Depth 8.2 in
Percent Full 100.0 %
Critical Slope 0.008 ft/ft
Velocity 3.21 ft/s
Velocity Head 0.16 ft
Specific Energy 1.16 ft
Froude Number (N/A)
Maximum Discharge 2.71 cfs
Discharge Full 2.52 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 12.0 in
Critical Depth 8.2 in
Channel Slope 0.005 ft/ft
Critical Slope 0.008 ft/ft
27 Siemon Company Drive Suite 200 W Page 1 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 15"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 15.0 in
Diameter 15.0 in
Discharge 4.57 cfs
Results
Discharge 4.57 cfs
Normal Depth 15.0 in
Flow Area 1.2 ft²
Wetted Perimeter 3.9 ft
Hydraulic Radius 3.8 in
Top Width 0.00 ft
Critical Depth 10.4 in
Percent Full 100.0 %
Critical Slope 0.007 ft/ft
Velocity 3.72 ft/s
Velocity Head 0.22 ft
Specific Energy 1.47 ft
Froude Number (N/A)
Maximum Discharge 4.91 cfs
Discharge Full 4.57 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 15.0 in
Critical Depth 10.4 in
Channel Slope 0.005 ft/ft
Critical Slope 0.007 ft/ft
27 Siemon Company Drive Suite 200 W Page 2 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 18"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 18.0 in
Diameter 18.0 in
Discharge 7.43 cfs
Results
Discharge 7.43 cfs
Normal Depth 18.0 in
Flow Area 1.8 ft²
Wetted Perimeter 4.7 ft
Hydraulic Radius 4.5 in
Top Width 0.00 ft
Critical Depth 12.7 in
Percent Full 100.0 %
Critical Slope 0.007 ft/ft
Velocity 4.20 ft/s
Velocity Head 0.27 ft
Specific Energy 1.77 ft
Froude Number (N/A)
Maximum Discharge 7.99 cfs
Discharge Full 7.43 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 18.0 in
Critical Depth 12.7 in
Channel Slope 0.005 ft/ft
Critical Slope 0.007 ft/ft
27 Siemon Company Drive Suite 200 W Page 3 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 24"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 24.0 in
Diameter 24.0 in
Discharge 16.00 cfs
Results
Discharge 16.00 cfs
Normal Depth 24.0 in
Flow Area 3.1 ft²
Wetted Perimeter 6.3 ft
Hydraulic Radius 6.0 in
Top Width 0.00 ft
Critical Depth 17.3 in
Percent Full 100.0 %
Critical Slope 0.007 ft/ft
Velocity 5.09 ft/s
Velocity Head 0.40 ft
Specific Energy 2.40 ft
Froude Number (N/A)
Maximum Discharge 17.21 cfs
Discharge Full 16.00 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 24.0 in
Critical Depth 17.3 in
Channel Slope 0.005 ft/ft
Critical Slope 0.007 ft/ft
27 Siemon Company Drive Suite 200 W Page 4 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 30"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 30.0 in
Diameter 30.0 in
Discharge 29.00 cfs
Results
Discharge 29.00 cfs
Normal Depth 30.0 in
Flow Area 4.9 ft²
Wetted Perimeter 7.9 ft
Hydraulic Radius 7.5 in
Top Width 0.00 ft
Critical Depth 22.0 in
Percent Full 100.0 %
Critical Slope 0.006 ft/ft
Velocity 5.91 ft/s
Velocity Head 0.54 ft
Specific Energy 3.04 ft
Froude Number (N/A)
Maximum Discharge 31.20 cfs
Discharge Full 29.00 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 30.0 in
Critical Depth 22.0 in
Channel Slope 0.005 ft/ft
Critical Slope 0.006 ft/ft
27 Siemon Company Drive Suite 200 W Page 5 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 36"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 36.0 in
Diameter 36.0 in
Discharge 47.16 cfs
Results
Discharge 47.16 cfs
Normal Depth 36.0 in
Flow Area 7.1 ft²
Wetted Perimeter 9.4 ft
Hydraulic Radius 9.0 in
Top Width 0.00 ft
Critical Depth 26.8 in
Percent Full 100.0 %
Critical Slope 0.006 ft/ft
Velocity 6.67 ft/s
Velocity Head 0.69 ft
Specific Energy 3.69 ft
Froude Number (N/A)
Maximum Discharge 50.73 cfs
Discharge Full 47.16 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 36.0 in
Critical Depth 26.8 in
Channel Slope 0.005 ft/ft
Critical Slope 0.006 ft/ft
27 Siemon Company Drive Suite 200 W Page 6 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 42"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 42.0 in
Diameter 42.0 in
Discharge 71.14 cfs
Results
Discharge 71.14 cfs
Normal Depth 42.0 in
Flow Area 9.6 ft²
Wetted Perimeter 11.0 ft
Hydraulic Radius 10.5 in
Top Width 0.00 ft
Critical Depth 31.7 in
Percent Full 100.0 %
Critical Slope 0.006 ft/ft
Velocity 7.39 ft/s
Velocity Head 0.85 ft
Specific Energy 4.35 ft
Froude Number (N/A)
Maximum Discharge 76.52 cfs
Discharge Full 71.14 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 42.0 in
Critical Depth 31.7 in
Channel Slope 0.005 ft/ft
Critical Slope 0.006 ft/ft
27 Siemon Company Drive Suite 200 W Page 7 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center
Circular Pipe - 48"
Project Description
Manning
Formula Friction Method
Full Flow
Capacity Solve For
Input Data
Roughness Coefficient 0.013
Channel Slope 0.005 ft/ft
Normal Depth 48.0 in
Diameter 48.0 in
Discharge 101.57 cfs
Results
Discharge 101.57 cfs
Normal Depth 48.0 in
Flow Area 12.6 ft²
Wetted Perimeter 12.6 ft
Hydraulic Radius 12.0 in
Top Width 0.00 ft
Critical Depth 36.6 in
Percent Full 100.0 %
Critical Slope 0.006 ft/ft
Velocity 8.08 ft/s
Velocity Head 1.02 ft
Specific Energy 5.02 ft
Froude Number (N/A)
Maximum Discharge 109.25 cfs
Discharge Full 101.57 cfs
Slope Full 0.005 ft/ft
Flow Type Undefined
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 48.0 in
Critical Depth 36.6 in
Channel Slope 0.005 ft/ft
Critical Slope 0.006 ft/ft
27 Siemon Company Drive Suite 200 W Page 8 of 8
Watertown, CT 06795 USA +1-203-755-1666
6/9/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Pipe Capacity.fm8 Center

Page 12 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT G
Soils Report
Kimley»Horn
009/6c
1 00L/L6COOZ/L6C002/L6C00/L6COOC/L6C
i
i
§
§
OOSLIOc OOZIOc OOcLlOc OOGLlOc OOLOc 00OLlOc
IL2
o
C
s
G‘
5 He
A
T*Y MI" F II
MuLCiS 06II
Z
N.89 6II
Coffee Rd
NuCiS 06IT
N.89 06TI
35° 23' 1" N
309100
35° 22‘40"N
18 309600309500309400309300309200309100 309700
309400
35° 22 40 N
309700 310000309900 309800
310000
83 35° 23' 1" N
_
- a _wCSKC,
d
6 Pi
Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone UN WGS84 008 400 200
200 100 50
Map Scale: 1:4,710 if printed on A landscape (11" x 8.5") sheet —Feet
1200
— Meters
300
** PNA ur
r , 5 — -Etrerter cteare citee ki < “ " mtit 2 i i iid 11.2% t r xe A
-
| % 2r79 • fhaste ar Ya N l ■I
v
i
s v ।
4 } ‘s t.
0 V th E.

F
t
i
I fri
5 s ...U.
s 123
i
^1
It IIIi »
I sis
Ft
J
is //
1 - iri. ■ ymwistioa twoosrem
#
E
hmemngndv s it
st
$
wr H.

Roseda
af (Ms seaD®.

Hydrologic Soil Group—Kern County, California, Northwestern Part USDA Natural Resources
Conservation Service
6/9/2025

Page 1 of 4 ends

Web Soil Survey
National Cooperative Soil Survey
nnnnnnnn
B/D
□ B
□ A/D
□
A
Soil Rating Points
B/D
CC/D
DNot rated or not available
a
A/D
Local Roads Not rated or not availableMajor Roads
D
US Routes C/DInterstate Highways
B/D
C
a
A/D
□ Not rated or not available
□ D□ C/D
□
C

MAP INFORMATION MAP LEGEND
Transportation
_ Rails
Water Features
Streams and Canals
The soil surveys that comprise your AOI were mapped at
1:24,000.

Please rely on the bar scale on each map sheet for map
measurements.

Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:

Coordinate System: Web Mercator (EPSG:3857)Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.Soil Survey Area: Kern County, California, Northwestern Part Survey Area Data: Version 17, Sep 3, 2024Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

Soil Rating Lines
.. A
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Date(s) aerial images were photographed: Mar 12, 2022—Mar 22, 2022
Area of Interest (AOI)
Area of Interest (AOI)
Background
Aerial Photography
Soils
Soil Rating Polygons
A
Warning: Soil Map may not be valid at this scale.

Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.

USDA
Hydrologic Soil Group—Kern County, California, Northwestern Part 6/9/2025

Page 2 of 4 ends

Natural ResourcesConservation Service
Web Soil Survey
National Cooperative Soil Survey
Hydrologic Soil Group—Kern County, California, Northwestern Part Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 125 A 49.4 84.2%
257 9.3 15.8%
Totals for Area of Interest 58.7 100.0%
Description
Rating Options
Aggregation Method: Dominant Condition
USDA Natural Resources
Conservation Service
The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
6/9/2025

Page 3 of 4 ends

Granoso loamy sand, 0
to 2 percent slopes
Water
Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture.

These soils have a moderate rate of water transmission.

Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.

Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.

If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.

Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.

Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.

Web Soil Survey
National Cooperative Soil Survey
Hydrologic Soil Group—Kern County, California, Northwestern Part Component Percent Cutoff: None Specified
Tie-break Rule: Higher
USDA Natural Resources
Conservation Service
6/9/2025

Page 4 of 4 ends

Web Soil Survey
National Cooperative Soil Survey

GEOTECHNICAL INVESTIGATION

PROPOSED BAKERSFIELD SHOPPING CENTER

SWC OF COFFEE ROAD AND ROSEDALE HIGHWAY
APN 368-010-05

BAKERSFIELD, CALIFORNIA
Prepared for:

Coffee Road Ventures, LLC
c/o DJM Capital Partners Inc.
7777 Edinger Avenue, Suite 133
Huntington Beach, CA 92647
Prepared by:

Geotechnical Professionals Inc.
5736 Corporate Avenue
Cypress, California 90630
(714) 220-2211
Project No. 3282.I December 13, 2024

GEOTECHNICAL
PROFESSIONALS INC.
3282-I-01L.doc (12/24)
December 13, 2024
Coffee Road Ventures, LLC
c/o DJM Capital Partners Inc.
7777 Edinger Avenue, Suite 133
Huntington Beach, California 92647
Attention: Mr. Brett Thornton
Senior Vice President Construction & Development
Subject: Report of Geotechnical Investigation
Proposed Bakersfield Shopping Center
SWC of Coffee Road and Rosedale Highway
Bakersfield, California
GPI Project No. 3282.I
Dear Mr. Thornton:

Transmitted herewith is our report of geotechnical investigation for the subject project. The report presents the results of our design-level evaluation of the subsurface conditions at the site and recommendations for design and construction.

We appreciate the opportunity of offering our services on this project and look forward to seeing the project through its successful completion. Please contact us if you have questions regarding our report or need further assistance.

Very truly yours,
Geotechnical Professionals Inc.

Patrick McGervey, G.E.

Senior Engineer
Donald A. Cords, G.E.

Principal
Distribution: Addressee (PDF)
,0
allllly 00920Zz
No. 3255 No. GE 2529
Sorecw
*6
OF CALK 0%
5736 Corporate Avenue • Cypress, CA 90630 • (714) 220-2211 , FAX (714) 220-2122 ( Ul C
SSOF CAUYC C,°ECHLC

GEOTECHNICAL
PROFESSIONALS INC.
m m
- I) /
/*)
orESS/O, sK\.F.McAk
L/P
9 AoOFESSo,
(SA 0 /S0Aco,. 2 8 0$
S No. GE 2529 ) m C \ 120
0) <
~ ' Q_
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24)

1.0 INTRODUCTION

1.1 GENERAL
This report presents the results of the geotechnical investigation performed by Geotechnical Professionals Inc. (GPI) for the proposed retail development at the subject project site in Bakersfield, California. The geographical site location is shown on the Site Location Map, Figure 1.

1.2 PROJECT DESCRIPTION
Based on the preliminary Site Plan by MCG Architecture, we understand that the site will be developed into a 46.2-acre retail center with several single-story buildings. The buildings include a “Major A” retail building covering a footprint of approximately 88,129 square feet (sf), connected “Majors B through L” buildings covering a combined footprint of about 216,973 sf, and 12 “Pad” buildings with footprints ranging from 1,764 to 11,546 sf. The total building area is planned to be approximately 416,115 sf. The layouts of the buildings are provided on Figure 2, Site Plan (Proposed).

The ”Major” buildings will include a market, health club, and retail buildings. Major D building is currently planned to be a Whole Foods grocery store. The “Pads” will include restaurants, retail, outpatient medical office, gas station, and carwash buildings. Other improvements include a community park, multi-use path, screen walls, drives, parking, and landscaping.

Currently, we are not aware of the locations of stormwater infiltration systems onsite.

Proposed finish floor elevations were not finalized at the time this report was prepared. We have assumed proposed grades for the buildings will be similar to existing grades plus or minus 3 feet. We anticipate the loading dock areas will be cut up to 3 to 4 feet below existing grades, and the remainder of the parking and landscape areas will be similar to existing grades with cuts and fills on the order of 2 to 3 feet.

Structural plans are not available at this time, however based on our experience on similar projects, we anticipate typical interior column loads of up to 150 kips, wall loads up to 9 kips per lineal foot (klf), and floor slab loads up to 150 pounds per square foot for the “Major” buildings. For the remaining “Pad” buildings, we anticipate up to 50 kips or less for column loads and 3 to 5 klf for continuous wall loads.

Our recommendations are based upon the above structural and grading information. We should be notified if the actual loads and/or grades change during the project design to either confirm or modify our recommendations. When the project structural and grading plans become available, we should be provided with copies for review and comment.

1.3 PURPOSE OF INVESTIGATION
The primary purpose of this investigation and report is to provide an evaluation of the existing geotechnical conditions at the site as they relate to the design and construction of the proposed development. More specifically, this investigation was aimed at providing geotechnical recommendations for earthwork, and design of foundations.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 2

2.0 SCOPE OF WORK
Our scope of services included review of existing documents, field exploration, laboratory testing, engineering analysis and preparation of this report.

Our field investigation for “Major D” was performed in general accordance with the geotechnical requirements outlined in the Whole Foods Lease agreement “Exhibit E” Section

2.2. The field exploration program for the retail center consisted of 17 Cone Penetration Tests (CPTs) and 24 exploratory borings. Within the proposed pad of “Major D”, we performed nine explorations (3 borings and 6 CPTs). The locations of the explorations are shown on the Proposed and Existing Site Plans, Figures 2 and 3, respectively.

The CPT’s were advanced to depths ranging from 30 to 100 feet below existing site grades.

Detailed logs of the CPT’s and a summary of the equipment used are presented in Appendix A. The borings were drilled using hollow-stem auger equipment to depths between 6 and 31½ feet below existing site grades. Details of the drilling and Logs of Borings are presented in Appendix B.

Shear wave velocity measurements were performed in CPT C-2 at approximately 10-foot intervals to a depth of 100 feet, where the CPT. A summary of the shear wave velocity measurements is provided in Appendix A.

Laboratory soil tests were performed on selected representative samples as an aid in soil classification and to evaluate the engineering properties of the soils. The geotechnical laboratory testing program included moisture content, dry density, grain size, shear strength (direct shear), consolidation, expansion potential, collapse, compaction, R-value, and soil corrosivity. Laboratory testing procedures and results are summarized in Appendix C.

Soil corrosivity testing was performed by Project X Corrosion Engineering (Project X) under subcontract to GPI. R-value testing was performed by Geologic Associates under subcontract to GPI. Their test results are presented in Appendix C.

Engineering evaluations were performed to provide earthwork criteria, foundation and slab design parameters, preliminary pavement sections and assessments of seismic hazards. The results of our evaluations are presented in the remainder of the report.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 3

3.0 SITE CONDITIONS

3.1 SURFACE CONDITIONS
The site is “L” shaped with the northern property line bordering Rosedale Highway, and the eastern property line bordering Coffee Road. The eastern portion of the site is bound by a gravel-paved staging/storage area to the south and a PG&E substation/Kern Power Plant to the west. The western portion of the site is bound by El Toro Viejo Road and a fast-food restaurant at the corner of El Toro Viejo Road and Rosedale Highway to the west, and the PG&E substation/Kern Power Plant to the south.

The site is predominately undeveloped with the eastern portion being used as staging/storage area, large power poles and electrical lines cross the middle of the site spanning from the PG&E substation to Rosedale Highway, and two tank structures within the northeastern portion of the site that are surrounded by a chain link fence. The ground surface is predominately soil with some small weeds spread across the site and gravel access/staging areas within the eastern portion of the site. Within the western third of the site are 5- to 8-feet-high raised access roads that appear to have been created to access oil pump jacks.

Based on our review of aerial photographs dating back to the oldest available photographs (1952), the site was used as part of the Kern Power Plant which included large steel storage tanks, oil pump jacks, storage buildings, drives and miscellaneous structures. The majority of the structures appear to have been demolished and removed between the years 2012 and 2014. Around the same time as the demolition, the adjacent substation appears to have been developed and some grading was performed onsite.

The site is relatively flat with ground surface elevations ranging from about Elevation +381 feet on the western portion of the site to +390 feet in the eastern portion of the site.

3.2 SUBSURFACE SOILS
Our field investigation disclosed a subsurface profile consisting of limited undocumented fills on the order of 0 to 3 feet below existing grades in the majority of our explorations overlying natural soils. Within borings B-3 and B-16, we encountered localized undocumented fills on the order of 5 to 7 feet below existing grades. Similar depths of undocumented fills may be encountered under former buildings and storage tanks. Although our explorations were not performed on top of the raised roads within the eastern portion of the site, we anticipate they consist of stockpiled onsite undocumented fill soils. Detailed descriptions of the conditions encountered in our explorations are provided in Appendices A and B. A brief summary of the subsurface conditions is provided below.

The undocumented fill soils consisted of predominately slightly moist silty sands with limited clayey sands. Documentation regarding the placement and compaction of the fill was not provided.

The natural soils consist of medium dense to dense silty sands with some thin layers of sandy silts and clayey sands to depths of about 20 to 25 feet where the soils became more dense and sandier. Our laboratory testing indicates the upper medium dense natural soils exhibit high strength and low compressibility and have a low susceptibility to hydro collapse.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 4
The soils within the upper 5 feet were predominately dry to slightly moist with an average moisture content of 5.8 percent (about 1 to 3 percent dry of optimum).

3.3 GROUNDWATER AND CAVING
Groundwater was not encountered in our explorations to a depth of 100 feet below existing grades. Groundwater levels in the site vicinity was evaluated based on groundwater well data provided by the California Department of Water Resources (CDWR) Water Data Library (wdl.water.ca.gov) at four wells each within about ¼-mile from the site in each direction (north, east, south and west). The groundwater well data readily available from these wells indicates the existing and historical high groundwater level is greater than 50 feet below existing grades.

Due to the method of drilling with a hollow-stem auger, the potential for caving was very difficult to determine. We anticipate the upper dry, sandy soils have the potential to exhibit moderate caving in open cuts and excavations.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 5

4.0 CONCLUSIONS AND RECOMMENDATIONS

4.1 GENERAL
Based on the results of our investigation, it is our opinion that from a geotechnical viewpoint it is feasible to develop the site as proposed, provided the following geotechnical issues are incorporated into the design and construction of the proposed structures.

The most significant geotechnical issues that will affect the design and construction of the proposed development are as follows:
• Undocumented fills were encountered to depths of predominately 3 feet below existing grade at the site with localized deeper fills on the order of 5 to 7 feet.

The fill soils are not considered to be suitable for direct support of foundations or floor slabs without remedial earthwork. For the proposed improvements, we recommend removal and recompaction of the fill and a portion of the upper low-density natural soils to provide uniform support for the planned foundations and floor slab.
• Current moisture contents of the upper soils are generally below the optimum moisture content; therefore, significant moisture conditioning (wetting) will be required.
• The site is located within a seismically active zone in California, and due to the relatively loose sandy soils near the ground surface, has the potential for seismically induced settlement. We estimate the magnitude of induced seismic ground surface settlement is on the order of ½ inch with differential settlement across 60 feet on the order of ¼ inch.
• The upper on-site sandy soils are considered to be susceptible to moderate caving in open cuts and excavations. Care should be taken to maintain support of the soils and structures left in-place adjacent to planned excavations. • Resistivity testing of representative samples of the on-site soils indicates that they are moderately corrosive to buried ferrous metals. If corrosion protection recommendations are required, a corrosion engineer such as Project X should be consulted to provide recommendations to protect these elements from corrosion.

Our recommendations related to the geotechnical aspects of the development of the site are presented in the subsequent sections of this report.

4.2 SEISMIC CONSIDERATIONS

4.2.1 General
The site is in a seismically active area of Southern California and is likely to be subjected to strong ground shaking due to earthquakes on nearby faults.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 6
We assume the seismic design of the proposed development will be in accordance with the 2022 California Building Code (CBC) criteria. Analysis of the data obtained during the seismic cone penetration test performed in CPT C-2 indicated that the “weighted average” shear-wave velocity within the upper 100 feet of the subject site (Vs30) is 1076 feet per second.

Details of the shear wave velocity testing are presented in Table A-1 in Appendix A. Based on the results of our seismic cone penetration test, a Site Class D may be used for the seismic design of the proposed development.

4.2.2 Strong Ground Motion Potential
Based on published information, the closest fault to the site is the San Andreas fault, which are located about 34 miles from the site.

During the life of the project, the site will likely be subject to strong ground motions due to earthquakes on nearby faults. Based on the SEOC/OSHPD website (seismicmaps.org), we computed that the site could be subjected to a peak ground acceleration (PGAM) of 0.48g.

Based on the USGS Unified Hazard Tool (USGS, 2014) the site is subject to a mean magnitude 6.4 earthquake. This acceleration has been computed using the mapped Maximum Considered Geometric Mean peak ground acceleration from the ASCE 7-16 (for 2022 CBC) and a site coefficient (FPGA) based on Site Class. The predominant earthquake magnitude was determined using a 2-percent probability of exceedance in a 50-year period, or an average return period of 2,475 years. The structural design will need to incorporate measures to mitigate the effects of strong ground motion.

The corresponding mapped seismic design parameters from the CBC are as follows:
2022 CBC:

SS = 0.92g SMS = Fa * SS = 1.04g SDS = 2/3 * SMS = 0.69g S1 = 0.34g SM1 = FV * S1 = 0.67g SD1 = 2/3 * SM1 = 0.44g In accordance with the 2022 CBC, site-specific response spectra are required for structures located in a Site Class D (with S1 greater than or equal to 0.2) unless, per the exceptions detailed in Section 11.4 8 of ASCE 7-16 (Supplement 3), the value of the parameter SM1, determined by Eq. (11.4-2) is increased by 50 percent for all applications of SM1. The resulting value of the parameter SD1 determined by Eq. (11.4-4) shall be used for all applications of SD1.

The above seismic code values should be confirmed by the Project Structural Engineer using the Site Class value above and the pertinent internet website and tables from the building code.

4.2.3 Potential for Ground Rupture
There are no known active faults crossing or projecting through the site. The site is not located in an Alquist-Priolo Earthquake Fault Zone. Therefore, ground rupture at this site due to faulting is considered unlikely.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 7

4.2.4 Liquefaction
The site is not located within a zone identified as having a potential for liquefaction by the State, as the quadrangle has not yet been assessed. Based on the depth of groundwater in the area, soil liquefaction is not likely to occur at the site.

4.2.5 Seismic Settlement
Seismic settlement (not related to liquefaction) occurs when strong earthquake shaking results in densification of loose to medium dense sandy soils above groundwater. The upper, natural, loose sandy soils encountered during our investigation exhibited the potential for seismic settlement.

If design level earthquake shaking occurs at the site, the estimated magnitude of seismic ground subsidence is expected to be on the order of ½ inch or less in the sandy soils onsite.

Provided remedial pad grading recommendations are implemented, we anticipate less than ¼ inch of seismic settlement.

4.3 EARTHWORK
The earthwork for the planned improvements is anticipated to consist of clearing and excavation of undocumented fill and upper natural soils, subgrade preparation, and the placement and compaction of fill.

4.3.1 Clearing
Prior to grading, the areas to be developed should be stripped of vegetation and cleared of debris. Buried obstructions, such as footings, utilities, and tree roots should be removed.

Deleterious material generated during the clearing operation should be removed from the site. Inert demolition debris, such as concrete and asphalt may be crushed for reuse in engineered fills, in accordance with the criteria presented in the “Materials for Fill” section of this report.

The existing power poles at the site will likely be supported on concrete piles. If the poles are removed in the parking or flatwork areas, we recommend the piles be removed to a depth of at least 2 feet below the bottom of the proposed pavement section or flatwork. While not anticipated based on current plans, if the poles are removed in the footprint of buildings, we recommend the piles be removed to a depth of 4 feet below the bottom of the proposed foundations for the buildings. We recommend the entire pile not be vibrated and removed from the ground but chipped cleanly at the above recommended depths. We recommend the location and depth of the piles be surveyed during demolition. The resulting excavation should be backfilled as recommended in the “Subgrade Preparation” and “Placement and Compaction of Fill” sections of this report.

Although not anticipated, if cesspools or septic systems are encountered during grading, they should be removed in their entirety. The resulting excavation should be backfilled as recommended in the "Subgrade Preparation" and "Placement and Compaction of Fill" sections of this report. As an alternative, cesspools can be backfilled with lean sand-cement slurry (two-sacks cement per yard). At the conclusion of the clearing operations, a representative of GPI should observe and accept the site prior to further grading.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 8

4.3.2 Excavations
Excavations at this Property will include removals of undocumented fill and disturbed and low-density natural soils, footing excavations, and trenching for proposed utility lines.

Building Pads, Pavements and Minor Structures
To provide uniform support for the planned buildings, prior to placement of fills or construction of the buildings, the existing fill and a portion of the upper natural soils within the proposed building pads should be removed and replaced as properly compacted fill. For planning purposes, removals for the building pads should extend to a depth of at least 4 feet below existing grades and at least 1 foot below the base of foundations, whichever is deeper.

Deeper removals associated with demolition of the former structures may be required where deeper undocumented fills are encountered. Removals should extend below these depths where undocumented fills or otherwise unsuitable materials are encountered.

Removals below minor structures, such as free-standing walls and trash enclosures, should extend to a depth of 3 feet below existing grade or 1-foot below the base of the foundations, whichever is deeper. For onsite and offsite pavements and flatwork, removals should extend at least 1 foot below existing grades or the proposed subgrade, whichever is deeper.

The actual depths of removals should be determined in the field during grading by GPI. The soils exposed at the base of the overexcavation should be processed in place as described in the “Subgrade Preparation” section of this Report.

Excavations should be readily achieved using conventional methods. The contractor should determine the best method for removal based on the subsurface conditions outlined herein.

Lateral Limits
The Project Surveyor should accurately stake the corners of the areas to be overexcavated in the field. Where space is available, the base of the excavations should extend laterally at least 5 feet beyond the building lines or edge of foundations, or a minimum distance equal to the depth of overexcavation/compaction below finish grade (i.e., a 1:1 projection below the top outside edge of footings), whichever is greater. Building lines include the footprint of the building and other foundation supported improvements, such as canopies and attached site walls.

Where the recommended removals for minor site walls cannot extend laterally as recommended above due to property constraints, the wall foundations should be designed using a reduced allowable bearing pressure as discussed in the “Foundation” section of this Report.

Existing Utilities
Existing utility trench backfill, if encountered, should be removed and replaced as properly compacted fill. The limits of removal should be confirmed in the field. We recommend known utilities be shown on the grading plan.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 9
Caving Potential and Cuts
The granular soils onsite are expected to have a moderate caving potential when exposed in open cuts. We recommend the following maximum slope inclinations for temporary, unsurcharged excavations:

Excavation Height (ft) Slope (h:v)
<4 Vertical
<12 ¾:1
<25 1:1
If cuts greater than 25 feet are planned, we should be contacted to provide further recommendations. The allowable slope inclinations are measured from the toe to the top of the cut. Even at these inclinations, due to the granular nature of the onsite soils some raveling and local sloughing should be anticipated. The exposed slope face should be kept moist (but not saturated) during construction to reduce local sloughing. Surcharge loads should not be permitted within a horizontal distance equal to the height of cut from the top of the excavation or 5 feet from the top of the slopes, whichever is greater, unless the cut is properly shored.

Excavations that extend below an imaginary plane inclined at 45 degrees below the edge of adjacent existing site facilities (including existing underground utilities) should be properly shored to maintain support of adjacent elements. Excavations and shoring systems should meet the minimum requirements given in the State of California Occupational Safety and Health Standards.

If trench box shoring is used for the installation of new utilities, sloughing will likely occur surrounding the trench boxes. Care should be taken when considering the shoring methods used to minimize the impact of adjacent improvements.

Slot Cuts
Deeper removals along property lines may require shoring or slot cuts. Recommendations for shoring are provided in the “Retaining Structures” section of the Report. Removals that will undermine existing adjacent pavements or hardscape or property may utilize “ABC” slot cuts to depths not greater than 8 feet. Unsurcharged slot cuts up to 8 feet in height should not be wider than 6 feet and should be backfilled to finished grade prior to excavation of the adjacent four slots (two on each side of the excavated slot). We can provide slot widths for other slot heights if required. A test slot should be performed, while observed by a GPI representative, prior to production slots to confirm the stability of the planned cuts.

4.3.3 Subgrade Preparation
After the recommended cuts and removals are performed and prior to placing fills or construction of the proposed improvements, the subgrade soils should be scarified to a depth of 8 inches, moisture conditioned to moisture contents of 0 to 2 percent over the optimum moisture content and compacted to at least 90 percent of the maximum dry density, determined in accordance with ASTM D1557. Moistening of the dry, upper sandy soils anticipated at the site can usually be accomplished by deep ripping and liberal watering prior to compaction. Pre-watering the site prior to grading may also be used to moisten the soils; however, application of water during grading will still be required.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 10

4.3.4 Material for Fill
The surficial on-site soils are suitable for use as generally compacted fill. Although not encountered, fill placed within the upper 3 feet of the building pad should not have particles larger than 3-inches in diameter. Additionally, clay soils, which were encountered in limited quantities in the upper onsite soils, should not be used as wall backfill, directly below floor slabs, or directly beneath pedestrian flatwork.

Imported fill material should be predominantly granular (containing between 10 and 40 percent fines - portion passing No. 200 sieve), non-expansive (E.I. of 20 or less), and not contain particles larger than 3 inches in diameter. Imported fill materials in pavement areas should have a minimum R-value of 40. GPI should be provided with a sample (at least 50 pounds) and notified of the location of soils proposed for import at least 72 hours in advance of importing. Each proposed import source should be sampled, tested and accepted for use prior to delivery of the soils to the site. Soils imported prior to acceptance by GPI may be rejected if not suitable.

In backfill areas where mechanical compaction of soil backfill is impractical due to space constraints, sand-cement slurry may be substituted for compacted backfill. The slurry should contain at least 1½ sacks of cement per cubic yard and have a maximum slump of 5 inches.

If used within the footprint of the building pads, the slurry should contain 2½ sacks of cement per cubic yard.

If open-graded rock is used as backfill, the material should be placed in lifts and mechanically densified. Open-graded rock should be separated from soils by a suitable filter fabric (Mirafi 140N or equivalent).

4.3.5 Placement and Compaction of Fills
Fill soils should be placed in horizontal lifts, moisture-conditioned, and mechanically compacted to at least 90 percent of the maximum dry density in accordance with ASTM D1557. Soils within one foot of the subgrade for floor slabs and pavement areas, and the aggregate base material should be compacted to a relative compaction of at least 95 percent.

The optimum lift thickness will depend on the compaction equipment used and can best be determined in the field. The following uncompacted lift thickness can be used as preliminary guidelines.

Plate Compactors 4-6 inches
Track Equipment, Small Vibratory or Static Rollers (5-ton±) 6-8 inches Heavy Loaders/Scrapers 8-12 inches
The maximum lift thickness should not be greater than 12 inches and each lift should be thoroughly compacted and accepted prior to subsequent lifts.

Fills consisting of the imported or on-site sandy soils should be placed at a moisture content of 0 to 2 percent over the optimum moisture content to achieve the required compaction. The moisture content of the upper sandy soils encountered in the explorations was generally well below the optimum moisture content. As such, significant moisture conditioning (wetting) will be required prior to replacing the soils as properly compacted fill.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 11
Once moisture is conditioned and properly compacted, the exposed soils should not be allowed to dry out prior to covering. A representative of GPI should confirm the moisture content of the subgrade soils immediately prior to placement of concrete or additional fill.

During backfill of excavations, the fill should be properly benched into the construction slopes as it is placed in lifts.

4.3.6 Shrinkage and Subsidence
Shrinkage is the loss of soil volume caused by compaction of fills to a higher density than before grading. Subsidence is the settlement of in-place subgrade soils caused by loads generated by large earthmoving equipment. For earthwork volume estimating purposes, an average shrinkage value of 13 percent (+/- 3 percent) may be used. Subsidence of 0.1 feet may be assumed for the surficial soils. These values are estimates only and exclude losses due to removal of vegetation and debris. Actual shrinkage and subsidence will depend on the types of earthmoving equipment used and should be determined during grading.

4.3.7 Trench/Wall Backfill
Utility trench and wall backfill should be mechanically compacted in lifts. Although only encountered in limited quantities, clayey soils should not be used in retaining wall backfill.

Lift thickness should not exceed those values given in the "Compacted Fill" section of this report. Moisture conditioning (wetting) of the on-site soils may be required prior to re-use as backfill. Jetting or flooding of backfill materials should not be permitted. GPI should observe and test trench and wall backfills as they are placed.

4.3.8 Observation and Testing
A representative of GPI should observe excavations, subgrade preparation, and fill placement activities. Sufficient in-place field density tests should be performed during fill placement and in-place compaction to evaluate the overall compaction of the soils. Soils that do not meet minimum compaction requirements should be reworked and tested prior to placement of any additional fill.

4.4 FOUNDATIONS

4.4.1 Foundation Type
The proposed structures can be supported on conventional spread footings founded in properly compacted fill.

Minor structures such as light poles, shade structures, and playground equipment may be supported on drilled pier foundations supported on natural, undisturbed soils or on conventional isolated and/or continuous shallow footings, in accordance with the recommendations provided in this report. Shallow foundations should be supported on properly compacted fill.

4.4.2 Allowable Bearing Pressures
Based on the shear strength and elastic settlement characteristics of the natural and recompacted on-site soils, a static allowable net bearing pressure of up to 4,000 pounds per square foot (psf) may be used for both continuous footings and isolated column footings for Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 12
the buildings. These bearing pressures are for dead-plus-live-loads, and may be increased one-half for short-term, transient, wind and seismic loading. The actual bearing pressure used may be less than the value presented above and can be based on economics and structural loads to determine the minimum width for footings as discussed below. The maximum edge pressures induced by eccentric loading or overturning moments should not be allowed to exceed these recommended values.

For minor structures, such as site walls and property line screen walls, where reduced excavation depths have been recommended and lateral limits of the overexcavation may be limited, we recommend a maximum allowable bearing capacity of 2,500 pounds per square foot be used.

4.4.3 Minimum Footing Width and Embedment
The following minimum footing widths and embedments are recommended for the corresponding allowable bearing pressure.

STATIC BEARING

PRESSURE
(psf)

MINIMUM FOOTING
WIDTH
(inches)
MINIMUM FOOTING*

EMBEDMENT
(inches)
4,000 24 24
3,500 24 18
2,500 18 18
* Refers to minimum depth below lowest adjacent grade at the time of foundation construction. If interior footings are not fully loaded before the slab is in-place, the depth of interior footings may be taken from the top of the floor slab.

A minimum footing width and depth of 18 inches should be used even if the actual bearing pressure is less than 2,500 psf.

4.4.4 Estimated Settlements
Total static settlement of isolated pad or continuous wall footings (up to 150 kips for columns and 9 kips per lineal foot for walls) is expected to be on the order of ¾-inch or less. Differential static settlement between similarly loaded column footings or along a 60-foot span of a continuous footing is expected to be on the order of 3/8-inch or less. The differential settlement across other spans can be extrapolated from the information provided. Most of the settlement will occur immediately upon load application.

The potential for seismic settlement was addressed in a previous section of this report and should be referred to in evaluating the total potential settlement of foundations.

The above estimates assume that the recommended earthwork will be performed and that the footings will be sized in accordance with our recommendations.

4.4.5 Lateral Load Resistance
For resistance to lateral loads, a combination of frictional resistance and passive soil bearing pressure may be used. For frictional resistance, a coefficient of friction of 0.35 may be used for design. In addition, an allowable lateral bearing pressure equal to an equivalent fluid weight of 300 pounds per cubic foot may be used, provided the footings are poured tight against compacted fill soils. These values may be used in combination without reduction.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 13

4.4.6 Pier Foundation Design Parameters
Based upon the results of our subsurface explorations and laboratory testing, the drilled pier design parameters shown in the following tables may be used for axial and lateral pile design:

Recommended Design Parameters - Axial
Depth Below
Existing Grade
(feet)
Allowable
Pile Skin Friction
(psf)
Allowable
Pile Tip Resistance
(psf)
0-3 50 ---
3-10 500 ---
>10 1,000 ---
We utilized a factor of safety of 3 to determine the allowable skin friction values. The settlement of the drilled piers designed using the above allowable skin friction values only is anticipated to be on the order of ½-inch.

The uplift capacity of the piers may be taken as one-half of the downward capacities derived from skin friction only.

For design of the pier footings for the shade structures by the simplified pole formula presented in Section 1807A.3.2.1 of the 2022 CBC, a unit passive pressure of 600 pounds per square foot per foot (up to a maximum value of 6,000 psf) may be used for the shaft in lieu of presumptive lateral bearing values presented in Table 1806A.2. This value incorporates the allowable increase stated in the Section 1806A.3.4 of the code for single poles that can tolerate a ½-inch of deflection under short-term loads.

The above pier design parameters for shallow depths assume the ground surface surrounding the piers will be paved. If the surface surrounding the pier is not paved, we recommend the upper 18 inches of soil be ignored in developing lateral resistance and skin friction. Otherwise, lateral and skin friction resistance may be utilized beginning at the finished grade.

Since the drilled piers will be designed to derive resistance from soil friction only, rigorous cleaning of the loose materials from the bottom of the excavation prior to placement of steel and concrete is not considered essential. However, effort should be made to clean the bottom with the drill rig-mounted equipment.

Pier excavations should be filled with concrete on the same day that they are drilled. The concrete should be placed with special equipment so that it is not allowed to fall freely more than 5 feet or strike the walls of the excavations. Drilling should not be performed within 5 feet of recently excavated or recently poured piers until the concrete has been allowed to set for at least 6 hours.

The piers should be poured in a manner that will not result in concrete flowing into adjacent drilled pier excavations and prevent segregation of aggregate. Drilled pier construction should be performed in accordance with the latest edition of ACI 336.1, “Standard Specifications for the Construction of Drilled Piles.”
Pier excavations should be observed by a representative of GPI to confirm and document the depth, diameter, and embedment in suitable materials.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 14

4.4.7 Foundation Inspection
Prior to placement of steel and concrete, a representative of GPI should observe and approve all foundation excavations including pier excavations.

4.5 BUILDING FLOOR SLABS
Slab-on-grade floors should be supported on granular, non-expansive (EI < 20), compacted soils as discussed in the "Placement and Compaction of Fills" section. Based on our explorations, granular, non-expansive soils are readily available on-site. We do not anticipate swell pressures to negatively impact the building floor slab based on the non-expansive characteristics of the on-site soils. There is not a geotechnical requirement for slab thickness or reinforcing based on the non-expansive characteristics of the on-site soils.

For elastic design of slabs-on-grade supporting sustained concentrated loads, a modulus of subgrade reaction (k) of 300 pounds per cubic inch (pounds per square inch per inch of deflection) and 150 pounds per cubic inch may be used for on-site soils for short- and long-term loads.

A vapor/moisture retarder should be placed under slabs that are to be covered with moisture-sensitive floor coverings (parquet, vinyl tile, etc.) or will be storing moisture sensitive supplies.

Currently, common practice is to use a 15-mil polyolefin product such as Stego Wrap for this purpose. The need for a sand layer with the vapor retarder is not a geotechnical issue and is a decision for the Project Architect. It should be noted that the material used as a vapor retarder is only one of several factors affecting the prevention of moisture accumulation under floor coverings. Other factors include maintaining a low water to cement ratio for the concrete used for the floor slab, effective sealing of joints and edges (particularly pipe penetrations), and excess moisture in the concrete. The manufacturer of the floor coverings should be consulted for establishing acceptable criteria for the condition of floor surface prior to placing moisture-sensitive floor coverings.

4.6 CORROSION
Laboratory testing by Project X (Appendix C) on selected samples indicates soluble sulfate contents of between 16 and 130 mg/kg. For the 2022 CBC, foundation concrete should conform to the requirements outlined in ACI 318, Section 4.3 for category S1 levels of soluble sulfate exposure. Chloride levels in the samples tested were found to be between 3.8 mg/kg and 19 mg/kg. Due to the potential exposure to moisture, we recommend at least a Category C1 be used in design.

Resistivity testing of representative samples of the onsite soils indicates that they are moderately corrosive to buried ferrous metals. GPI does not practice corrosion protection engineering. If corrosion protection recommendations are required, a corrosion engineer, such as Project X, should be consulted to provide recommendations to protect these elements from corrosion.

4.7 RETAINING STRUCTURES
The following recommendations are provided for retaining walls that do not extend more than 10 feet in height. We recommend that conventionally constructed walls be backfilled with sandy (granular) soils, which are anticipated to be readily available on-site.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 15
Active earth pressures can be used for designing walls that can yield at least ½-inch laterally in 10 feet of wall height under the imposed loads. For drained level backfill comprised of non-expansive granular soils (no more than 40 percent passing No. 200 U.S. standard sieve), the magnitude of active pressures are equivalent to the pressures imposed by a fluid weighing 40 pounds per cubic foot (pcf). This pressure may also be used for the design of temporary excavation support. For retaining walls retaining sloping backfill with inclinations of up to 2:1 (h:v), we recommend an active pressure of 55 pcf be used in design.

At-rest pressures should be used for restrained walls that remain rigid enough to be essentially non-yielding. For select, non-expansive, level, drained backfill, a lateral pressure of an equivalent fluid weighing 60 pounds per cubic foot can be used. If the walls are designed with sloping backfill (up to 2:1), a lateral pressure of an equivalent fluid weighing 90 pounds per cubic foot may be used.

To account for seismic loads, an additional lateral earth pressure equal to 18 pcf (equivalent fluid pressure) should be added to the above active pressures. This pressure should be combined with the active earth pressures presented above. If the retaining walls are designed using the at-rest pressures provided above, only the difference between the active plus seismic pressures and needs to be included as the seismic pressure.

Walls subject to surcharge loads should be designed for an additional uniform lateral pressure equal to one-third and one-half the anticipated surcharge pressure for unrestrained and restrained walls, respectively. The wall backfill should be well-drained to relieve possible hydrostatic pressure or designed to withstand these pressures.

The wall backfill for conventional walls should be well-drained to relieve possible hydrostatic pressure or designed to withstand these pressures. A drain consisting of perforated pipe and gravel wrapped in filter fabric should be used. One cubic foot of rock should be used for each lineal foot of pipe. The fabric (non-woven filter fabric, Mirafi 140N or equivalent) should be lapped at the top.

The Structural Engineer should specify the use of select, granular wall backfill on the plans for retaining walls that are to be conventionally backfilled. Wall footings should be designed as discussed in the "Foundations" section.

4.8 DRAINAGE
Positive surface gradients should be provided adjacent to structures to direct surface water run-off and roof drainage away from foundations and slabs toward suitable discharge facilities. The introduction of water into the existing fill soils can result in subsidence. Long-term ponding of surface water should not be allowed on pavements or adjacent to buildings.

4.9 STORM WATER INFILTRATION
Current local regulations generally require that storm water be infiltrated in the site soils of new developments when possible. The soil types present at the site control the ability of water to infiltrate into the subgrade.

The upper soils encountered in our explorations consist of generally sandy soils that will likely facilitate stormwater infiltration. When stormwater infiltration systems are designed, Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 16
we should be provided the locations and types of systems so that infiltration testing can be performed, if required.

4.10 EXTERIOR CONCRETE AND MASONRY FLATWORK
Exterior concrete and masonry flatwork should be supported on non-expansive, compacted fill, which appears to be readily available onsite. This includes the slabs for trash enclosures, generators, etc. This includes exterior sidewalks, stamped concrete, trash enclosures, non-traffic pavement, pavers, etc. Prior to placement of concrete, the subgrade should be prepared as recommended in the "Subgrade Preparation" section of this report.

4.11 PAVED AREAS
Laboratory testing of near surface soils indicated a R-values of 72 and 60. To account for soil variability, we have used an R-value of 50 for preliminary design. Based on the subgrade soils anticipated, we recommend the following pavement sections for the various levels of traffic (traffic indices) anticipated:

PAVEMENT AREA TRAFFIC INDEX
SECTION THICKNESS (inches)

ASPHALT/PORTLAND

CONCRETE

AGGREGATE

BASE COURSE
Asphalt Concrete
Parking and Drives
Truck Delivery Areas
Heavy Truck Areas
5 6
7 3.0

4.0 4.0
4 4
5 Portland Cement Concrete
Parking and Drives
Truck Delivery Areas
Heavy Truck Areas
5 6
7 5.5

6.0 6.5
--
--
--
If vehicular pavers are to be used for the project, the paver and leveling sand should be supported on at least the thickness of aggregate base shown above for the appropriate asphalt concrete traffic index.

The pavement subgrade underlying the aggregate base should be properly prepared and compacted in accordance with the recommendations outlined under "Subgrade Preparation".

The portland cement concrete used for paving should have a compressive strength of at least 3,500 psi at the time the pavement is subjected to vehicular traffic.

The pavement base course should be compacted to at least 95 percent of the maximum dry density (ASTM D1557). Aggregate base should conform to the requirements of Section 26 of the California Department of Transportation Standard Specifications for Class II aggregate base (three-quarter-inch maximum) or Section 200-2 of the Standard Specifications for Public Works Construction (Green Book) for untreated base materials (except Processed Miscellaneous Base).

The above recommendations assume that the base course will be properly drained. The design of paved areas should incorporate measures to prevent moisture build-up within the base course and subgrade, which can otherwise lead to premature pavement failure. For example, curbing adjacent to landscaped areas should be deep enough to act as a barrier to infiltration of irrigation water into the adjacent base course.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 17

4.12 GEOTECHNICAL OBSERVATION AND TESTING
We recommend that a representative of GPI observe earthwork during construction to confirm that the recommendations provided in our report are applicable during construction. The earthwork activities include grading, compaction of fills and subgrade preparation, as well as ground improvement and foundation construction. If conditions are different than expected, we should be afforded the opportunity to provide alternate recommendations based on the actual conditions encountered.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 18

5.0 LIMITATIONS
The report, exploration logs, and other materials resulting from GPI's efforts were prepared exclusively for use by Coffee Road Ventures LLC and their consultants in designing the proposed development. The report is not intended to be suitable for reuse on extensions or modifications of the project or for use on any project other than the currently proposed development as it may not contain sufficient or appropriate information for such uses. If this report or portions of this report are provided to contractors or included in specifications, it should be understood that they are provided for information only.

Soil deposits may vary in type, strength, and many other important properties between points of exploration due to non-uniformity of the geologic formations or to man-made cut and fill operations. While we cannot evaluate the consistency of the properties of materials in areas not explored, the conclusions drawn in this report are based on the assumption that the data obtained in the field and laboratory are reasonably representative of field conditions and are conducive to interpolation and extrapolation.

Furthermore, our recommendations were developed with the assumption that a proper level of field observation and construction review will be provided during grading, excavation, and foundation construction by GPI. If field conditions during construction appear to be different than is indicated in this report, we should be notified immediately so that we may assess the impact of such conditions on our recommendations. If construction phase services are performed by others they must accept full responsibility for all geotechnical aspects of the project including this report.

Our investigation and evaluations were performed using generally accepted engineering approaches and principles available at this time and the degree of care and skill ordinarily exercised under similar circumstances by reputable Geotechnical Engineers practicing in this area. No other representation, either expressed or implied, is included or intended in our report.

Respectfully submitted,
Geotechnical Professionals Inc.

Patrick I.F. McGervey, G.E. Donald A. Cords, G.E.

Senior Engineer Principal
allllly Zz
No. 3255 No. GE 2529
SorecwO" *0•%
Oul . C
[ m< I ) /
/*)
NOrecHC" "e OF
A/P9
"corcnto
coorESS/On rMcolc 20
9 AoOFESSo,,
(r| —
sovA
us No. GE 2529 m
“ lx‘
0 <1 Q
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24) 19

REFERENCES
American Society of Civil Engineers (2017), “Minimum Design Loads and Associated Criteria for Buildings and Other Structures,” ASCE/SEI 7-16.

American Society of Civil Engineers (2018), “Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Supplement 1” ASCE/SEI 7-16, effective December 12, 2018.

American Society of Civil Engineers (2018), “Minimum Design Loads and Associated Criteria for Buildings and Other Structures, Supplement 3” ASCE/SEI 7-16, effective November 5, 2021.

California Department of Water Resources, Water Data Library (WDL) Station Map, Wells 29S27E28C001M, 29S27E29K001M, 29S27E29C001M and 29S27E20Q001M accessed November 2024, https://wdl.water.ca.gov/waterdatalibrary/Map.aspx.

California Geological Survey, 2008, “Guidelines for Evaluating and Mitigating Seismic Hazards in California,” Special Publication 117A
California Office of Statewide Health Planning and Development (OSHPD), Seismic Design Maps Website, https://seismicmaps.org/
Historic Aerials, Aerial Photography from the Past and Present”, National Environmental Title Research, LLC. http://www.historicaerials.com
United States Geologic Survey, Earthquake Ground Motion Parameters Application, http://earthquake.usgs.gov/research/hazmaps/design
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3282-I-01R (12/24)

TABLE OF CONTENTS
PAGE

1.0 INTRODUCTION 1

1.1 GENERAL 1

1.2 PROJECT DESCRIPTION 1

1.3 PURPOSE OF INVESTIGATION 1

2.0 SCOPE OF WORK 2

3.0 SITE CONDITIONS 3

3.1 SURFACE CONDITIONS 3

3.2 SUBSURFACE SOILS 3

3.3 GROUNDWATER AND CAVING 4

4.0 CONCLUSIONS AND RECOMMENDATIONS 5

4.1 GENERAL 5

4.2 SEISMIC CONSIDERATIONS 5

4.2.1 General 5

4.2.2 Strong Ground Motion Potential 6

4.2.3 Potential for Ground Rupture 6

4.2.4 Liquefaction 7

4.2.5 Seismic Settlement 7

4.3 EARTHWORK 7

4.3.1 Clearing 7

4.3.2 Excavations 8

4.3.3 Subgrade Preparation 9

4.3.4 Material for Fill 10

4.3.5 Placement and Compaction of Fills 10

4.3.6 Shrinkage and Subsidence 11

4.3.7 Trench/Wall Backfill 11

4.3.8 Observation and Testing 11

4.4 FOUNDATIONS 11

4.4.1 Foundation Type 11

4.4.2 Allowable Bearing Pressures 11

4.4.3 Minimum Footing Width and Embedment 12

4.4.4 Estimated Settlements 12

4.4.5 Lateral Load Resistance 12

4.4.6 Pier Foundation Design Parameters 13

4.4.7 Foundation Inspection 14

4.5 BUILDIGN FLOOR SLABS 14

4.6 CORROSION 14

4.7 RETAINING STRUCTURES 14

4.8 DRAINAGE 15

4.9 STORM WATER INFILTRATION 15

4.10 EXTERIOR CONCRETE AND MASONRY FLATWORK 16

4.11 PAVED AREAS 16

4.12 GEOTECHNICAL OBSERVATION AND TESTING 17

5.0 LIMITATIONS 18

REFERENCES
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI Project No. 3282.I 3259-I-02R (12/24)

TABLE OF CONTENTS - CONTINUED

APPENDICES
A Cone Penetration Tests
B Exploratory Borings
C Laboratory Tests

LIST OF FIGURES
FIGURE NO.
1 Site Location Map
2 Site Plan (Proposed)
3 Site Plan (Existing)

APPENDIX A
A-1 to A-17 Log of CPTs
Table A-1 Shear Wave Velocity Results

APPENDIX B
B-1 to B-24 Logs of Borings

APPENDIX C
C-1 to C-8 Direct Shear Test Results
C-9 Consolidation Test
Table C-1 Corrosivity Test Results

1.20"

SITE LOCATION MAP
FIGURE 1

DJM BAKERSFIELD
GPI PROJECT NO.: 3282.I

GEOTECHNICAL
PROFESSIONALS, INC.

N
SCALE: 1" = 2000'
0 2000 4000 FEET
BASE MAP REPRODUCED FROM © GAIA GPS (2024)
SITE

LOCATION

ROSEDALE HIGHWAY ROSEDALE HIGHWAY
- TH t —
Be
U.

Michele Avenu Be Well
Lonon Avenue a
5 -I
(D awl
Downing Aven ue B
S
5 I ) i Avenue
J p c (2 • 1
QHe ■ je |
1311, d
C
bl -Ilil Is Dri — Greenacres Fruitvale-—
•) amat - D
।
n %
Holland Street
J
Glenn Street THE LJ
Langley Road (2 I
■ i
O l
/
8 If • •
( 0000
a o
ME k
1 I
reek Avenue 11
an JE
58 O. r* “TruxtunA SB Westside Parkway 58 e
Tru)
t
O
C
aal Ney 4
© ©
1 1.8
4 hhiriiJi
Chiropractic
and Salt Suite
llllIU,?
- ■ : s
8 /hi (Ou
n
D
o
5 2
©
--callowo
9 C
t
8 Q
cand
3 ( s
f-II-U
o
s
P
o
$ i
00 00
see’
Kern River
___-Parkway "
Park-.

O
£oa $
f
u
o.
0 3
2 >
tnI
g
moeestnei 'I • - jfnr i J r L‘; 41 i..
9 2
2 %
t
\
—ag/P.। 9pe S340-Lee,
Drive
C Enger Street
100
1L
Z
—TB— ---
Emp
n-Be aluttn-at—"
==1TS. U
s '
si
> । s
!
si
D
S
%
1 i
8 gNay
Ouebosnpon
lgg
55 1
BD
O
E=
i
o
tway ' ~
ugieSddleb
4/.

F
UL
l KTEI
(1
ay7
r T1
Street
)

0.26"
B-24
C-17
EL
T
O
R
O
VIEJO
R
D
FIGURE 2

GEOTECHNICAL
PROFESSIONALS, INC.

GPI PROJECT NO.: 3282.I

DJM BAKERSFIELD
SCALE: 1" = 300'

SITE PLAN
(PROPOSED)

EXPLANATION

APPROXIMATE LOCATION AND NUMBER OF

PROPOSED EXPLORATORY BORING

APPROXIMATE LOCATION AND NUMBER OF

PROPOSED CONE PENETRATION TEST
C-1 B-1
N BASE PLAN REPRODUCED FROM SITE PLAN PROVIDED BY MCG ARCHITECTURE DATED 6/26/2024 0 300 600 FEET
C-2 C-3
C-4
C-5
C-12
C-15 C-14
C-17
C-16
B-3 B-4 B-5
B-6
B-7
B-8 B-9
B-15
B-17
B-18
B-20 B-21
B-22
C-13
B-2
B-23 B-24
B-19
B-16
B-10
B-11 C-6 C-7 B-14
C-8 C-9
C-10C-11
B-12
B-13
B-11 C-6 C-7
C-8 C-9
C-10C-11
B-12
B-13
EXISTNG TRAFFIC —“5 1481 SE
1 4 z -
POSE SETBACK 1 ■ TBAQ K STNG TRAFFIC £
i
MULTI-USE PATH — —== —F —0= Fas I
J PAF |P—
27 g-00ud,0 • =l‘ 3 0 0
e E BfflKINC . I t r 0 • 0 0
J E SURPLUS V l e E Q c| s5= & 0 0 #0s (L Mie 5 10)
- •••• r
—a EH. 1 C 1SHC
WWH D RESTS 1 E
miNe rWl....... IO/C._A 66WWD . / P ■ E-ODD//F
0 • LTHCLUB £ mr 2

POSE SETBACK
-
r
UNI wwee
muljUUL -$0// 0 HHIHHHHIFO te 1

IINUHL L
=g=5 111ITINN
..... _r I_____ L -0 p
SHOPS/ (IHH 0
0 RESTSE
|
-
Et#l
0 -C !
I
GLL Li E6 PAO!
SF .....
17 s
7 MH 1 ;
i
OFFICE
C
...

AFFIC SIGNAL U.. Ti I
—3 / nth O FUELCANOPY I., - EaM -
1 -
4 tllltiItMO i PAD 12
ASH
CTHHAHHeHHAHO
I J / MAJORI -EC—
/
$ A
llllllll IIIIII
O
o
)
aeV ''
LU
LU
I
I
I
I

MAJOR G
RETAIL
25,054 SF
1 l
“ Z
Q
<
o
C
gAs

MAJOR A
RETAIL
88,123 SF

MAJOR J
RETAIL
32,553 SF
fis_ 1
HTHJ
PAD4

PT RESTAURANT
4,277SF
DIREST.

RETAIL
9 3es SF
V
MulTUse PATH

MAJOR K
RETAIL
30,427 SF
-PACPERTY UNE
1 P.O,
REST.
7,818 SF
MUlTOSe PATH
CARN
—PROPERTY LINE
f ■ ■ me IIIPUU L. I I I I I I I RlaAdaiel =1st
I

PG&E SETBACK
07 9

DT REST
PAD1

DT RESTAURANT
PAD 11 \
nNC STORE

MAJOR F ,
9,525 SF 2
----------------- PADS---------------------
RETAIL
_9,182SF_________
PAD 3 | ROSEDALE HIGHWAY DT RESTAURANT
- J i __ _ Lil
ilt
“0+114110
.O27,809 SF 1 8l
_________ PAD ______ -

DT RESTAURANT
RETAIL & MED. OFFICE
TPAD2

DT RESTAURANT
____3,601 SF_ _

0.26"
B-24
C-17
FIGURE 3

GEOTECHNICAL
PROFESSIONALS, INC.

GPI PROJECT NO.: 3282.I

DJM BAKERSFIELD
SCALE: 1" = 300'

SITE PLAN
(EXISTING)

EXPLANATION

APPROXIMATE LOCATION AND NUMBER

OF EXPLORATORY BORING

APPROXIMATE LOCATION AND NUMBER

OF CONE PENETRATION TEST

LIMITS OF THIS PROJECT
C-1
B-1
N BASE PLAN REPRODUCED FROM SITE PLAN PROVIDED BY MCG ARCHITECTURE DATED 6/26/2024 0 300 600 FEET
C-2 C-3
C-4
C-5
C-12
C-15 C-14
C-17
C-16
B-3 B-4 B-5
B-6
B-7
B-8 B-9
B-15
B-17
B-18
B-20 B-21
B-22
C-13
B-2
B-23 B-24
B-19
B-16
B-10
B-14
B-11 C-6 C-7
C-8 C-9
C-10C-11
B-12
B-13

ROSEDALE HIGHWAY
EL T
O
R
O

V EI JO
C

OFFEE R
O
A
D
Srear Slips" EE

VELACO I
H
XT •ail
%
S
r . AWWAWMWWWWWWM*/WAWHM44R(( *•
rtro TI '
ante - $
—„40! ig *-*A eow Er "
V
6 TUUmnu UTIU. j C
TEEEEsslsis '
. . - — I. ----1 — I 1
tmmy Th a
E
PT D TT f 1
i E.
©• a i lee K
1 . - - ■
I
------
_---====V I_________________
— 22 js
1 El 4 6 [
a
1 6.pr IHHIFHAHHHHO
"OuTif ‘ Hi • 410 a
r at ’ "DoS BH- • -m- > of- i
2 • 8 . 8 e
Ear 2 It 2 . ]
■ - w IIIII —
■ w w '
1 -W-O I
II E
I - in ^0 i
I W a TH
w ue th IL
2* i 1 ulle. 1 u ist 4 •
I
tK
+
-1 — . " ft l
[HR t -0 0 •J A l
"& O.... uD
X OTIHIHIHHIIHIIHHIIHO “ I .f
uup 2
O-F*-<HO i l i —
11"- MI ULo 3
m i
T k
04— • * —.2
*
G
I
• ♦ il
M
• - 4
e.

Phase
A
*
U’iiiIIIO
Q 11 ft
HP] I
O.0--------HT—fl & U
0-44 HIII0 IM
1 .

Sis
—
r
t
f
..
1 IWH-*
quulil
“Jill/
III
pods all
Fr
51 t—r
w
...... iEH
s e
so"asa set: L y - 7
1:
ms ash
7A
— -
=E
- • e.
11 21.d
a.
d
1$
< Yr
P = "eetr
.
0 f 4 $
B- — —
I
y’hi It D d
f 4 ta
/
C
< )
<
1 I
,4
IB
♦
FI t
1 |
A
merl
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (12/24) A-1

APPENDIX A

CONE PENETRATION TESTS
The subsurface conditions were investigated by performing 17 Cone Penetration Tests (CPTs) at the site. The CPT’s were advanced to depths ranging from 30 to 100 feet below existing grades. The locations of the CPTs are shown on the Site Plans, Figures 2 and 3.

The Cone Penetration Test consists of pushing a cone-tipped probed into the soil deposit while simultaneously recording the cone tip resistance and side friction resistance of the soil to penetration. The CPTs described in this report were conducted in general accordance with ASTM specifications (ASTM D5778) using an electric cone penetrometer.

The CPT equipment consists of a cone assembly mounted at the end of a series of hollow sounding rods. A set of hydraulic rams is used to push the cone and rods into the soil while a continuous record of cone and friction resistance versus depth is obtained in both analog and digital form at the ground surface. A specially designed truck is used to transport and house the test equipment and to provide a 30-ton reaction to the thrust of the hydraulic rams.

Standard data obtained during a CPT consists of continuous stratigraphic information with close vertical resolution. Stratigraphic interpretation is based on relationships between cone tip resistance and friction resistance. The calculated friction ratio (CPT friction sleeve resistance divided by cone tip resistance) is used as an indicator of soil type.

Granular soils typically have low friction ratios and high cone resistance, while cohesive or organic soils have high friction ratios and low cone resistance. These stratigraphic material categories form the basis for all subsequent calculations which utilize the CPT data.

A seismic cone penetration test provided shear wave velocity measurements of the soils profile within CPT C-2. A standard cone penetrometer is equipped with two sets of geophones located approximately 3 feet apart on the cone penetrometer. At 10-foot intervals, a shear wave source is activated at the ground surface suing an air-actuated hammer. A seismograph measures the travel time of the shear wave detected at each set of the geophones. The time difference provides the velocity of the shear wave in the layer between the two geophone sets. Table A-1 provides the shear wave velocity from the surface and the interval of the soil between the geophones.

Plots of the reduced CPT data acquired for this investigation are presented in Figures A-1 to A-17 of this appendix. The field testing and processing was performed by Kehoe Testing and Engineering under subcontract to Geotechnical Professionals Inc. (GPI). The interpreted soils descriptions were prepared by GPI.

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (12/24) A-2
The CPT locations were laid out in the field by measuring from existing features at the site. Upon completion, the CPT holes were backfilled above the caving with bentonite and the ground surface were patched with cold patch asphalt. The ground surface elevation at the CPT locations was estimated with Google Earth and should be considered very approximate.

SILTY SAND (SM) loose
CLAYEY SILT (ML) hard
SANDY SILT (ML) very stiff to hard
SILTY SAND (SM) medium dense
to dense
@ 12 feet, lens of silt
SAND WITH SILT (SP-SM) very
dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
305
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-1
FIGURE A-1

DJM BAKERSFIELD
performed:10-16-24
le V
SILTY SAND (SM) loose to
medium dense
@ 12 feet, dense
@ 17 feet, lens of sand with silt
@ 26 feet, lens of sand with silt
SAND WITH SILT (SP-SM) dense
to very dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-2
FIGURE A-2

DJM BAKERSFIELD
performed:10-16-24
SILTY SAND (SM) medium dense
SAND WITH SILT (SP-SM) dense
@ 23 feet, lens of silt
@ 25 feet, very dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-3
FIGURE A-3

DJM BAKERSFIELD
performed:10-16-24
SILTY SAND (SM) medium dense
@ 13 feet, dense
SAND WITH SILT (SP-SM) very
dense
SILTY SAND (SM) dense to very
dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
305
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-4
FIGURE A-4

DJM BAKERSFIELD
performed:10-16-24
SILTY SAND (SM) loose to
medium dense
@ 7 feet, dense
@ 8 feet, medium dense
@ 15 feet, dense
@ 18 feet, medium dense
@ 22 feet, lens of clayey silt
SAND WITH SILT (SP-SM) dense
to very dense
@ 31 feet, lens of clayey silt
SANDY SILT (ML) stiff to very stiff
SAND WITH SILT (SP-SM) very
dense
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-5
FIGURE A-5

DJM BAKERSFIELD
performed:10-17-24
V /[
SAND WITH SILT (SP-SM) very
dense
CLAYEY SILT (ML) hard
SILTY SAND (SM) dense to very
dense
Terminated at 100 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
80 85
90 95
100
105
110
115
120
125
130
135
140
145
150
155
160
. SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
305
300
295
290
285
280
275
270
265
260
255
250
245
240
235
230
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-5
FIGURE A-5

DJM BAKERSFIELD
performed:10-17-24

TTTTTTTTTTTTTTTT
OL

NAEA NV
MSWW

T T T T T T T T T T T
at
SILTY SAND (SM) loose to
medium dense
@ 4 feet, medium dense to dense
SAND WITH SILT (SP-SM) dense
to very dense
SILTY SAND (SM) medium dense
to dense
SAND WITH SILT (SP-SM) very
dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-6
FIGURE A-6

DJM BAKERSFIELD
performed:10-16-24
V /.

SILTY SAND (SM) dense to very
dense
@ 3 feet, lens of silty clay
@ 4 feet, medium dense to dense
SAND WITH SILT (SP-SM) dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-7
FIGURE A-7

DJM BAKERSFIELD
performed:10-16-24
e
SILTY SAND (SM) medium dense
to dense
@ 3 feet, lens of clayey silt
SAND WITH SILT (SP-SM) dense
to very dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-8
FIGURE A-8

DJM BAKERSFIELD
performed:10-17-24
SAND WITH SILT (SP-SM) very
dense
CLAYEY SILT (ML) hard
SILTY SAND (SM) medium dense
to dense
SAND WITH SILT (SP-SM) dense
to very dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-9
FIGURE A-9

DJM BAKERSFIELD
performed:10-17-24
SILTY SAND (SM) medium dense
@ 3 feet, lens of sandy silt
SAND WITH SILT (SP-SM) dense
@ 22 feet, very dense
@ 26 feet, dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-10
FIGURE A-10

DJM BAKERSFIELD
performed:10-17-24
SAND WITH SILT (SP-SM) dense
Layered SILTY SAND (SM) and
SANDY SILT (ML) medium dense
and stiff to very stiff
Layered SILTY SAND (SM) and
SAND WITH SILT (SP-SM) dense
to very dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-11
FIGURE A-11

DJM BAKERSFIELD
performed:10-17-24
SAND (SP) very dense
SILTY SAND (SM) medium dense
SAND WITH SILT (SP-SM) dense
to very dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-12
FIGURE A-12

DJM BAKERSFIELD
performed:10-16-24
SAND WITH SILT (SP-SM) very
dense
SILTY SAND (SM) medium dense
SAND WITH SILT (SP-SM) dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-13
FIGURE A-13

DJM BAKERSFIELD
performed:10-16-24
SILTY SAND (SM) loose to
medium dense
@ 2.5 feet, lens of sandy silt
@ 5.5 feet, lens of silty clay
SAND WITH SILT (SP-SM) dense
to very dense
@ 20 feet, lens of sandy silt
SILTY SAND (SM) dense
@ 26 feet, very dense
SAND WITH SILT (SP-SM) very
dense
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-14
FIGURE A-14

DJM BAKERSFIELD
performed:10-17-24
V /.

SILTY SAND (SM) loose to
medium dense
@ 2 feet, lens of silty clay
@ 5 feet, lens of clayey silt
@ 6 feet, medium dense
SAND WITH SILT (SP-SM) dense
SANDY SILT (ML) very stiff to hard
SAND WITH SILT (SP-SM) dense
to very dense
SILTY SAND (SM) dense
SAND WITH SILT (SP-SM) very
dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-15
FIGURE A-15

DJM BAKERSFIELD
performed:10-17-24
V /.

SILTY SAND (SM) medium dense
to dense
@ 8 feet, lens of silty clay
SAND WITH SILT (SP-SM) dense
to very dense
@ 28 feet, lens of sandy silt
@ 31 feet, medium dense
@ 36 feet, very dense
Terminated at 40 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
310
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-16
FIGURE A-16

DJM BAKERSFIELD
performed:10-17-24
SILTY SAND (SM) medium dense
SAND WITH SILT (SP-SM) dense
@ 12 feet, lens of silty sand
Terminated at 30 feet
TE
f
EV
250

T CONERESISTANCE
other locations and may change at this location with the passage of time. 0 8
)
H I O
0 P
(
I
300 4
I PR
(%)
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 . SOILDESCRIPTIONI
f F
6 2
E
(
C N C
50 E
T
PROJECT NO.: 3282.I
R N D
100
)
4 2
This summary applies only at the location of this cone penetration test 8 T
350
and at the time of the exploration. Subsurface conditions may differ at The interpreted soil description is derived from the friction ratio and cone resistance and is a simplification of actual conditions encountered. e
I
(
F L
150
R
RATIO
R
t
F E
) E T)
390
385
380
375
370
365
360
355
350
345
340
335
330
325
320
315
200
DE
0 (
O E
tsf
T
Date
et s
N
6 LOG OF CPT NO. C-17
FIGURE A-17

DJM BAKERSFIELD
performed:10-17-24
Table A-1
CPT Shear Wave Measurements
S-Wave Interval
Tip Geophone Travel S-Wave Velocity S-Wave
Depth Depth Distance Arrival from Surface Velocity
Location (ft) (ft) (ft) (msec) (ft/sec) (ft/sec)
CPT-2 10.04 9.04 9.26 12.52 740

20.01 19.01 19.11 24.84 770 800

30.02 29.02 29.09 34.88 834 993

40.03 39.03 39.08 42.26 925 1354

50.03 49.03 49.07 49.46 992 1387

60.01 59.01 59.04 57.40 1029 1256

70.01 69.01 69.04 64.58 1069 1392

80.05 79.05 79.08 74.18 1066 1045

90.03 89.03 89.05 83.72 1064 1046
100.03 99.03 99.05 92.08 1076 1196
Shear Wave Source Offset - 2 ft
S-Wave Velocity from Surface = Travel Distance/S-Wave Arrival Interval S-Wave Velocity = (Travel Dist2-Travel Dist1)/(Time2-Time1) Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (12/24) B-1

APPENDIX B

EXPLORATORY BORINGS
The subsurface conditions at the site were investigated by drilling and sampling 24 exploratory borings. The borings were advanced to depths ranging from approximately 6 to 31.5 feet below the existing ground surface. The locations of the explorations are shown on the Site Plan, Figure

2. The exploratory borings were drilled using truck-mounted hollow-stem auger drill equipment.

Relatively undisturbed samples were obtained using a brass-ring lined sampler (ASTM D 3550).

The brass-rings have an inside diameter of 2.42 inches. The ring samples were driven into the soil by a 140-pound hammer dropping 30 inches. The number of blows needed to drive the sampler into the soil was recorded as the penetration resistance.

At selected locations, disturbed samples were obtained using a split-spoon sampler by means of the Standard Penetration Test (SPT, ASTM D6066). The spoon sampler was driven into the soil by a 140-pound hammer dropping 30 inches, employing the “free-fall” hammer described above.

After an initial seating drive of 6 inches, the number of blows needed to drive the sampler into the soil a depth of 12 inches was recorded as the penetration resistance. These values are the raw uncorrected blowcounts.

The field explorations for the investigation were performed under the continuous technical supervision of GPI's representative, who visually inspected the site, maintained detailed logs of the borings, classified the soils encountered, and obtained relatively undisturbed samples for examination and laboratory testing. The soils encountered in the borings were classified in the field and through further examination in the laboratory in accordance with the Unified Soils Classification System. Detailed logs of the borings are presented in Figures B-1 to B-24 in this appendix.

The boring locations were laid out in the field by measuring from existing site features. Upon completion the explorations were backfilled with soil cuttings up to the existing ground surface.

Ground surface elevations at the exploration locations were estimated from Google Earth.

Fill: SILTY SAND (SM) orange brown, slightly moist
Natural: SILTY SAND (SM) orange brown, slightly
moist, medium dense
SAND (SP) light brown, dry, medium dense
SANDY SILT (ML) light brown, moist, very stiff
SAND (SP) light brown, dry, medium dense
Total Depth 11 feet
112
93 107
94 D
D
D
D
32 25
23 28

5.2 1.6

12.1 1.3

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-1
10-18-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 380
375
370
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-1
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-1
Rock Core

SAMPLE TYPES
T
C
380
375
370

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
SAND WITH SILT (SP-SM) light brown, slightly moist,
medium dense
SAND (SP) light brown, dry, medium dense
Total Depth 11 feet
107
107
101
100
B
D
D
D
D
22 23
32 26

5.4 4.1

2.0 1.7

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-2
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 380
375
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-2
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-2
Rock Core

SAMPLE TYPES
T
C
380
375

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, dry
@ 2 feet, medium dense
@ 5 feet, dense, with wire debris
Natural: SAND (SP) light brown, dry, medium dense
Total Depth 11.5 feet
102
98 94
D
D
D
S
41 50
34 26

3.1 8.0

1.3 1.3

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-3
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 385
380
375
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-3
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-3
Rock Core

SAMPLE TYPES
T
C
385
380
375

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T T T
□□□□□
Fill: CLAYEY SAND (SC) brown with white streaks,
moist, medium dense
Natural: SILTY SAND (SM) brown, slightly moist, loose
to medium dense
@ 6 feet, no recovery
SAND (SP) light brown, dry, medium dense
@ 15 feet, dense
@ 25 feet, very dense
@ 30 feet, dense
Total Depth 31 feet
106
98 86
B
D
D
D
S
S
S
S
S
D
19 15
26 21
27 32
40 60
60 9.0

6.7 1.4

1.2 1.5

3.0 2.5

1.5 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-4
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
355
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-4
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-4
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
355
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
89 □□□□□
Natural: SILTY SAND (SM) brown, slightly moist, loose
SAND (SP) light brown, dry, medium dense
Total Depth 6 feet
101
86 B
D
D
14 18

4.3 2.8

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-5
10-18-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
385
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-5
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-5
Rock Core

SAMPLE TYPES
T
C
385

NOT ENCOUNTERED
(FEET)
0 5 OL T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense, trace clay
@ 3 feet, orange brown
SAND WITH SILT (SP-SM) light brown, dry, medium
dense
@ 9 feet, no recovery
SAND (SP) light brown, dry, dense
@ 25 feet, very dense
@ 30 feet, trace gravel
Total Depth 31.5 feet
105
108
108
B
D
D
D
D
S
S
S
S
S
22 40
30 25
36 40
48 66
62 6.3

6.2 2.7

1.0 1.2

1.1 2.0

2.2 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-6
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 380
375
370
365
360
355
350
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-6
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-6
Rock Core

SAMPLE TYPES
T
C
380
375
370
365
360
355
350
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: CLAYEY SAND (SC) brown with white streaks,
moist
Natural: CLAYEY SAND (SC) brown with white streaks,
moist, medium dense
SILTY SAND (SM) mottled brown, moist, loose
Total Depth 6 feet
107
95 D
D
19 12

11.9 9.9

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-7
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
380
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-7
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-7
Rock Core

SAMPLE TYPES
T
C
380

NOT ENCOUNTERED
(FEET)
0 5 OL $088888 8898888 T T T
□□□□□
Fill: SILTY SAND (SM) light brown, dry, trace gravel
Natural: SILTY SAND (SM) light brown, dry, medium
dense, trace gravel
@ 3 feet, dry to slightly moist
@ 6 feet, mottled brown
@ 9 feet, no recovery
SAND (SP) light brown, dry, dense
CLAYEY SILT (ML) mottled brown, wet, hard
SAND (SP) light brown, dry, very dense
@ 30 feet, dense
Total Depth 31 feet
100
101
102
83 B
D
D
D
D
S
S
S
S
D
21 33
50 18
31 36
46 55
70 3.8

4.5 4.0

1.2 1.2

1.2 22.6

2.0 1.7

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-8
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 380
375
370
365
360
355
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-8
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-8
Rock Core

SAMPLE TYPES
T
C
380
375
370
365
360
355
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist, with
gravel
Natural: SILTY SAND (SM) brown, slightly moist, loose
to medium dense, with gravel
@ 5 feet, moist, trace clay
Total Depth 6 feet
103
104
D
D
15 18

6.7 11.8

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-9
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
380
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-9
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-9
Rock Core

SAMPLE TYPES
T
C
380

NOT ENCOUNTERED
(FEET)
0 5 OL T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
SAND (SP) light brown, slightly moist, loose
@ 10 feet, medium dense
Total Depth 11 feet
111
110
97 97
D
D
D
D
29 27
13 25

7.4 7.2

3.9 3.7

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-10
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 380
375
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-10
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-10
Rock Core

SAMPLE TYPES
T
C
380
375

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
CLAYEY SAND (SC) orange brown, slightly moist,
medium dense
SILTY SAND (SM) orange brown, dry, dense
SAND (SP) light brown, dry, medium dense
@ 12 feet, no recovery
@ 15 feet, dense
@ 20 feet, slightly moist, trace clay
@ 25 feet, dry
@ 30 feet, very dense
Total Depth 31.5 feet
103
105
102
86 110
D
D
D
D
D
D
S
S
S
S
32 32
55 28
28 30
38 36
47 55

5.2 7.8

1.3 0.6

0.7 1.1

6.4 1.3

1.1 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-11
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
355
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-11
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-11
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
355
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SC) orange brown, slightly
moist, dense
@ 4 feet, moist, medium dense
SAND WITH SILT (SP-SM) brown, slightly moist,
medium dense
CLAYEY SAND (SC) mottled orange and grey, slightly
moist, medium dense
@ 10 feet, no recovery
SAND (SP) light brown, dry, dense
@ 20 feet, very dense, no recovery
Total Depth 31.5 feet
110
104
99 97
99 D
D
D
D
D
D
D
S
S
53 25
27 28
23 55
88 60
65 5.5

8.3 4.0

7.1 1.8

1.5 1.8

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-12
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
355
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-12
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-12
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
355
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist, dense
@ 3 feet, moist, medium dense
CLAYEY SAND (SC) brown, moist, medium dense
SILTY SAND (SM) light brown, moist, medium dense
CLAYEY SAND (SC) brown, moist, medium dense
SAND (SP) light brown, dry, medium dense
SILTY SAND (SM) light brown, moist, medium dense
SAND (SP) light brown, dry, dense
@ 20 feet, no recovery
@ 25 feet, very dense
@ 30 feet, slightly moist
Total Depth 31 feet
116
110
114
103
92 95
94 78
93 B
D
D
D
D
D
D
D
D
D
D
52 43
33 26
22 30
50 62
77 98

6.2 9.5

11.9 10.4

3.3 12.6

2.6 1.6

3.9 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-13
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
355
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-13
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-13
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
355
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
@ 3 feet, mottled brown, moist, dense
SANDY SILT (ML) mottled brown, wet, stiff
SAND (SP) light brown, dry, medium dense, with gravel
Total Depth 10 feet
110
103
93 92
D
D
D
D
41 46
15 27

6.6 12.8

23.3 2.2

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-14
10-18-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 385
380
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-14
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-14
Rock Core

SAMPLE TYPES
T
C
385
380

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
@ 5 feet, moist
SAND (SP) light brown, slightly moist, medium dense
Total Depth 11 feet
114
107
95 90
D
D
D
D
38 24
19 24

6.5 9.0

4.5 3.9

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-15
10-18-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 385
380
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-15
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-15
Rock Core

SAMPLE TYPES
T
C
385
380

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, moist, medium dense,
trace gravel
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense, trace gravel
SAND (SP) light brown, dry, medium dense
Total Depth 10.5 feet
107
107
102
D
D
D
S
24 33
35 16

9.0 4.5

2.4 1.7

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-16
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 385
380
375
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-16
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-16
Rock Core

SAMPLE TYPES
T
C
385
380
375

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, slightly moist
Natural: SILTY SAND (SM) light brown, slightly moist,
dense
@ 3 feet, brown, medium dense
SAND WITH SILT (SP-SM) brown, moist, medium
dense
SAND (SP) light brown, dry, medium dense
@ 15 feet, dense
@ 20 feet, dense to very dense
@ 25 feet, very dense
Total Depth 31 feet
105
103
100
98 95
91 98
85 100
B
D
D
D
D
D
D
D
D
D
56 30
34 20
35 50
75 50/5"
50/5"

6.5 4.9

6.7 1.9

2.0 1.7

1.3 3.2

2.5 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-17
10-18-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-17
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-17
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, dry, dense
Natural: SILTY SAND (SM) light brown, dry, dense
SAND (SP) light brown, dry, medium dense
@ 15 feet, dense
SANDY SILT (ML) mottled brown, dry, hard
@ 25 feet, wet
SAND WITH SILT (SP-SM) light brown, dry, very dense
Total Depth 31 feet
110
86 83
92 94
95 93
97 D
D
D
D
D
D
D
D
55 35
20 33
59 70
95 50/5"

4.0 1.2

1.6 1.6

1.7 2.2

24.0 2.7

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-18
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-18
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-18
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist, dense,
with gravel
Natural: SILTY SAND (SM) orange brown, slightly
moist, medium dense
@ 6 feet, moist
SAND (SP) light brown, dry, medium dense
Total Depth 10 feet
106
101
103
99 B
D
D
D
D
47 17
26 23

6.4 4.9

12.0 2.5

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-19
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 385
380
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-19
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-19
Rock Core

SAMPLE TYPES
T
C
385
380

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, slightly moist, with gravel
Natural: SILTY SAND (SM) light brown, slightly moist,
dense, with gravel
SANDY CLAY (CL) orange brown with white streaks,
very moist to wet, very stiff
Total Depth 6 feet
109
105
D
D
72 34

5.8 18.0

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-20
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
385
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-20
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-20
Rock Core

SAMPLE TYPES
T
C
385

NOT ENCOUNTERED
(FEET)
0 5 OL T T T
□□□□□
Fill: SILTY SAND (SM) light brown, dry, medium dense
to dense
Natural: SILTY SAND (SM) light brown, dry, medium
dense to dense
@ 3 feet, medium dense
CLAYEY SAND (SC) light brown, moist, medium dense
SILTY SAND (SM) mottled brown, very moist, medium
dense
Total Depth 10 feet
106
92 107
95 D
D
D
D
45 20
27 21

4.3 7.6

7.7 13.9

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-21
10-16-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 390
385
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-21
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-21
Rock Core

SAMPLE TYPES
T
C
390
385

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T
□□□□□
Fill: SILTY SAND (SM) brown, slightly moist
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
SANDY SILT (ML) brown with white streaks, wet, very
stiff
SILTY SAND (SM) brown, wet, medium dense
SAND WITH SILT (SP-SM) brown, slightly moist,
dense
@ 15 feet, moist to very moist, medium dense
SAND (SP) light brown, dry, very dense
Total Depth 31 feet
105
104
93 102
107
103
91 95
D
D
D
D
D
D
D
D
36 24
26 50
43 90
92 100

4.3 3.9

24.3 5.2

10.2 1.5

2.1 2.9

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-22
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-22
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-22
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, dry, very dense,
trace gravel and debris
Natural: SILTY SAND (SM) brown, slightly moist,
medium dense
@ 6 feet, moist
@ 9 feet, mottled brown, slightly moist
SAND (SP) light brown, dry, dense
@ 15 feet, medium dense
@ 20 feet, very dense
SILTY SAND (SM) orange brown, moist, dense
SAND (SP) light brown, dry, very dense
Total Depth 31 feet
103
107
95 98
89 95
95 106
93 D
D
D
D
D
D
D
D
D
50/5"
38 27
31 49
31 50/5"
70 50/4"

2.2 4.4

9.0 7.0

1.3 1.6

2.3 11.4

2.3 SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-23
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 15
20 25
30 385
380
375
370
365
360
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-23
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-23
Rock Core

SAMPLE TYPES
T
C
385
380
375
370
365
360
C

NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 OL

T T T T T T T T T T T T T T T T T T T T T T
□□□□□
Fill: SILTY SAND (SM) light brown, slightly moist,
medium dense
Natural: SILTY SAND (SM) light brown, slightly moist,
medium dense
@ 5 feet, wet
@ 7 feet, slightly moist
@ 9 feet, brown, moist
Total Depth 10 feet
100
98 100
104
B
D
D
D
D
16 24
33 28

6.1 18.5

6.2 12.5

SAMPLE TYPES
(PCF)
Standard Split Spoon MOISTURE

DESCRIPTION OF SUBSURFACE MATERIALS SAMPLE TYPE
Bulk Sample
Tube Sample (%)
S
B-24
10-17-24
Drive Sample DRY DENSITY (BLOWS/FOOT) ELEVATION (FEET)
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

FIGURE
B
This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.

Standard Split Spoon
Drive Sample SAMPLE TYPE

FIGURE DEPTH

S ELEVATION
GROUNDWATER LEVEL (ft):

PROJECT NO.:

NOT ENCOUNTERED
0 5
10 390
385
D
DATE DRILLED:

EQUIPMENT USED: (FEET)
T
3282.I MOISTURE
8 " HOLLOW STEM AUGER PENETRATION RESISTANCE

DESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock Core
D
B
3282.I
B-24
DATE DRILLED:

DJM BAKERSFIELD
Tube Sample
(FEET)
LOG OF BORING NO. B-24
Rock Core

SAMPLE TYPES
T
C
390
385

NOT ENCOUNTERED
(FEET)
0 5
10 OL

T T T T T T T
□□□□□
Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (11/24) C-1

APPENDIX C

LABORATORY TESTS

INTRODUCTION
Representative undisturbed soil samples and bulk samples were carefully packaged in the field and sealed to prevent moisture loss. The samples were then transported to our Cypress office for examination and testing assignments. Laboratory tests were performed on selected representative samples as an aid in classifying the soils and to evaluate the physical properties of the soils affecting foundation design and construction procedures. Detailed descriptions of the laboratory tests are presented below under the appropriate test headings. Test results are presented in the figures that follow.

MOISTURE CONTENT AND DRY DENSITY
Moisture content and dry density were determined from a number of the ring samples. The samples were first trimmed to obtain volume and wet weight and then were dried in accordance with ASTM D2216. After drying, the weight of each sample was measured, and moisture content and dry density were calculated. Moisture content and dry density values are presented on the boring logs in Appendix A.

GRAIN SIZE DISTRIBUTION
Selected soil samples were dried, weighed, soaked in water until individual soil particles were separated, and then washed on the No. 200 sieve. That portion of the material retained on the No. 200 sieve was oven-dried and weighed to determine the percentage of the material passing the No. 200 sieve. The percentages passing the No. 200 sieve are tabulated below.

BORING
NO.

DEPTH
(ft) SOIL DESCRIPTION PERCENT PASSINGNo. 200 SIEVE
B-1 2 Silty Sand (SM) 23
B-2 0-5 Silty Sand (SM) 24
B-4 0-5 Silty Sand (SM) 34
B-5 2 Silty Sand (SM) 17
B-5 5 Sand (SP) 1
B-5 0-5 Silty Sand (SM) 20
B-6 0-5 Silty Sand (SM) 31
B-13 0-5 Silty Sand (SM) 30
B-19 0-5 Silty Sand (SM) 26
B-24 0-5 Silty Sand (SM) 29

DIRECT SHEAR
Direct shear tests were performed on undisturbed and remolded bulk samples in accordance with ASTM D3080. The bulk samples were remolded to approximately 90 percent of maximum density (ASTM D1557). The samples were placed in the shear machine, and a normal load comparable Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (12/24) C-2
to the in-situ overburden stress was applied. The samples were inundated, allowed to consolidate, and then were sheared to failure. The tests were repeated on additional test specimens under increased normal loads. Shear stress and sample deformation were monitored throughout the test. The results of the direct shear tests are presented in Figures C-1 to C-7.

CONSOLIDATION
One-dimensional consolidation testing was performed on one relatively undisturbed soil sample in accordance with ASTM D2435. After trimming the ends, the sample was placed in the consolidometer and loaded to 0.4 ksf. Thereafter, the sample was incrementally loaded to a maximum load of 12.8 ksf. Sample deformation was measured to 0.0001 inch. The sample was inundated with water at 1.6 ksf. Rebound behavior was investigated by unloading the sample back to 0.4 ksf. The results of the consolidation test, in the form of percent consolidation versus log pressure, are presented in Figure C-8.

HYDRO-CONSOLIDATION
Oedometer tests were performed on relatively undisturbed samples in accordance with ASTM D5333. After trimming the ends, the sample was placed in the consolidometer and loaded to 0.4 ksf. Thereafter, the samples were incrementally loaded to 1.6 ksf at the in-situ moisture content and then saturated. Sample deformation was measured to

0.0001 inch. The amount of collapse is shown below as percent compression of the sample.

BORING NO. DEPTH (ft) SOIL

DESCRIPTION
Surcharge
(PSF)
TOTAL COMPRESSION (%)
BEFORE

SATURATION
AFTER

SATURATION
TOTAL

COLLAPSE
B-1 7 Sand (SP) 1600 1.0 1.4 0.4
B-18 20 Sandy Silt (ML) 1600 1.5 2.2 0.7

EXPANSION INDEX
Expansion index tests were performed on select bulk samples. The test was performed in accordance with ASTM D4829, to assess the expansion potential of on-site soils. The results of the test are summarized below:

BORING
NO.

DEPTH
(ft) SOIL DESCRIPTION EXPANSIONINDEX
B-13 0-5 Silty Sand (SM) 1
B-24 0-5 Silty Sand (SM) 3

COMPACTION TEST
Maximum dry density/optimum moisture tests were performed in accordance with ASTM D1557 on representative bulk samples of the site soils. The test results are as follows:

Coffee Road Ventures, LLC December 13, 2024
Proposed Bakersfield Shopping Center, Bakersfield, California GPI No. 3282.I 3282-I-01X.doc (12/24) C-3
BORING
NO.

DEPTH
(ft)

SOIL DESCRIPTION

MAXIMUM

DRY DENSITY
(pcf)

OPTIMUM

MOISTURE
(%)
B-4 0-5 Silty Sand (SM) 131 8.5
B-13 0-5 Silty Sand (SM) 133 7.0
Silty Sand (SM) with Gravel 135 6.5
B-19 0-5 Silty Sand (SM) 126 9.0
Silty Sand (SM) with Gravel 128 8.0

CORROSIVITY
Soil corrosivity testing was performed by Project X on representative stockpile fill and natural soil samples provided by GPI. The test results are summarized in Table C-1 at the end of this Appendix.

R-VALUE
Suitability of the near-surface soils for pavement was evaluated by conducting an R-value test.

The test was performed in accordance with ASTM D2844 by GeoLogic Associates (GLA) under subcontract to GPI. The result of the test is as follows:

BORING
NO.

DEPTH
(ft) SOIL DESCRIPTION R-VALUEBY EXUDATION
B-2 0-5 Silty Sand (SM) 72
B-17 0-5 Silty Sand (SM) 60
Project X REPORT S241023F
Corrosion Engineering Page 2
Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr., Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com
Soil Analysis Lab Results
Client: Geotechnical Professionals Inc.

Job Name: DJM Bakersfield
Client Job Number: 3282.I
Project X Job Number: S241023F
October 25, 2024
Method ASTM
G51
Bore# /
Description
Depth pH
(ft) (mg/kg) (wt%) (mg/kg) (wt%) (Ω-cm) (Ω-cm)
B 4 0-5 16.0 0.0016 3.8 0.0004 12,730 5,963 7.8
ASTM
G187
ASTM
D4327
ASTM
D4327
Resistivity
As Rec'd | Minimum
Sulfates
SO4
2-
Chlorides
Cl-Cations and Anions, except Sulfide and Bicarbonate, tested with Ion Chromatography mg/kg = milligrams per kilogram (parts per million) of dry soil weight ND = 0 = Not Detected | NT = Not Tested | Unk = Unknown Chemical Analysis performed on 1:3 Soil-To-Water extract PPM = mg/kg (soil) = mg/L (Liquid)
Note: Sometimes a bad sulfate hit is a contaminated spot. Typical fertilizers are Potassium chloride, ammonium sulfate or ammonium sulfate nitrate (ASN). So this is another reason why testing full corrosion series is good because we then have the data to see if those other ingredients are present meaning the soil sample is just fertilizer-contaminated soil. This can happen often when the soil samples collected are simply surface scoops. This is why it's best to dig in a foot, throw away the top and test the deeper stuff. Dairy farms are also notorious for these items.

If one sample pops up much more corrosive than all others, we would recommend collecting more samples surrounding the problem sample location to determine if the peak is isolated to it. This allows us to conclude it was a contaminated sample and able to declare it an outlier.

Try out our new online forms: SOIL CORROSIVITY & THERMAL RESISTIVITY LAB REQUEST FORM & IN-SITU WENNER 4 PIN QUOTE REQUEST FORM PX4 Table C-1
Project X REPORT S241023E
Corrosion Engineering Page 2
Corrosion Control – Soil, Water, Metallurgy Testing Lab 29990 Technology Dr., Suite 13, Murrieta, CA 92563 Tel: 213-928-7213 Fax: 951-226-1720 www.projectxcorrosion.com
Soil Analysis Lab Results
Client: Geotechnical Professionals Inc.

Job Name: DJM Bakersfield
Client Job Number: 3282.I
Project X Job Number: S241023E
October 25, 2024
Method ASTM
G51
Bore# /
Description
Depth pH
(ft) (mg/kg) (wt%) (mg/kg) (wt%) (Ω-cm) (Ω-cm)
B 13 0-5 130.0 0.0130 19.4 0.0019 6,231 3,015 8.4
ASTM
G187
ASTM
D4327
ASTM
D4327
Resistivity
As Rec'd | Minimum
Sulfates
SO4
2-
Chlorides
Cl-Cations and Anions, except Sulfide and Bicarbonate, tested with Ion Chromatography mg/kg = milligrams per kilogram (parts per million) of dry soil weight ND = 0 = Not Detected | NT = Not Tested | Unk = Unknown Chemical Analysis performed on 1:3 Soil-To-Water extract PPM = mg/kg (soil) = mg/L (Liquid)
Note: Sometimes a bad sulfate hit is a contaminated spot. Typical fertilizers are Potassium chloride, ammonium sulfate or ammonium sulfate nitrate (ASN). So this is another reason why testing full corrosion series is good because we then have the data to see if those other ingredients are present meaning the soil sample is just fertilizer-contaminated soil. This can happen often when the soil samples collected are simply surface scoops. This is why it's best to dig in a foot, throw away the top and test the deeper stuff. Dairy farms are also notorious for these items.

If one sample pops up much more corrosive than all others, we would recommend collecting more samples surrounding the problem sample location to determine if the peak is isolated to it. This allows us to conclude it was a contaminated sample and able to declare it an outlier.

Try out our new online forms: SOIL CORROSIVITY & THERMAL RESISTIVITY LAB REQUEST FORM & IN-SITU WENNER 4 PIN QUOTE REQUEST FORM Table C-1 Continued PX4

Appendix I-3
Sewer Area Study
Kimley»Horn
kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Rosedale & Coffee Rd – Riverview
Market
Southwest corner of Rosedale and Coffee Rd,
Bakersfield, CA
Sewer Area Study
Prepared for:

Roque Nino
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
May 13, 2026
Prepared by:

Kimley-Horn
1100 W Town and Country Road, Suite 700
Orange, CA 92868
Barsin Bet Govargez, PE C81751
KimleyHorn

Page 2 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Purpose: Calculate remaining downstream sewer capacity for the proposed Riverview Market site located at the southwest corner of Rosedale and Coffee Rd, Bakersfield, CA in Kern County.

Approach: Utilize the City of Bakersfield Standards for determining existing and proposed sewer flows.
a. Monitor existing sewer manholes to determine existing peak dry weather flows. b. Quantify the proposed flows from the project based on City of Bakersfield sewer generation rates.
c. Quantify sewer flows from future downstream projects. d. Analyze critical sewer segments for available capacities post project completion.

Assumptions: The following information was assumed to apply to this study:
a. Sewer Generation rates and design standards are per the Subdivision and Engineering Design Policy Manual (1989) and Addendum from 2019.
b. Existing Pipes have an allowable d/D ratio of 0.8 per email direction from the Public Works Department (Stephan Trujillo on 8/14/2025).
c. The Generation rates used are as follows:
a. 250 gallons per day per single-family dwelling unit. b. 0.0056 CFS per Gross Acre for Commercial uses.
c. 0.0075 CFS per Gross Acre for Industrial uses
d. Peak factors used are as follows:
a. Residential: Peak Factor = 2.65x(Average Discharge)^-0.1 b. Commercial: Peak Factor = 1.8
c. Industrial: Peak Factor = 2.0
Existing Facilities: The proposed project is located at the Southwest Corner of Rosedale Highway and Coffee Road. It is bounded by Rosedale Highway to the north, Coffee Road to the east, an electrical substation to the south, and El Toro Viejo Road to the west. The project proposes to discharge sewer flows to the 36” City sewer main in El Toro Viejo Road. The city sewer main traverses south across a vacant parcel and turns west on Brimhall Road and continues to Jewetta Avenue where it increases in size to 42” and turns south. The 42” main continues south across the Kern River and increases in size to a 48” at Bolthouse Drive. The 48” main continues south in Buena Vista Road until it turns east at McCutchen Road. The sewer main continues east to the sewer lift station located at the southeast corner of McCutchen Road and Gosford Road. Refer to attachment A.

Kimley»Horn

Page 3 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Proposed Onsite Facilities: Sewer flows will be conveyed onsite through an underground sewer main of various sizes, generally from east to west, connecting to the existing 36”. Sewer flows would be conveyed through the existing City system to the lift station at the southeast corner of McCutchen Road and Gosford Road.

Existing Flow Monitoring Results: Hack Flo-Dar AV Sensor systems were installed and calibrated at the site on 08/19/2025. For two weeks, the depth and velocity data points were collected in 15-minute intervals. The equipment was removed, and data was validated on 09/04/2025. Another testing period was performed from 10/01/2025 to 10/16/2025 for Manhole #1.

Table 1 – Flow Monitoring Results
Manhole ID Downstream
Pipe Diameter
(inch)
Observed
Max Depth
(inch)
Observed
Max Velocity
(ft/s)
*Calculated
Peak Flow
(cfs)
Reported
Peak Flow
(cfs)
1 36 15.75 3.26 6.93 6.93
2 42 18.98 1.64 6.87 6.85
3 42 18.79 1.64 6.69 6.48
4 48 43.53 3.96 33.29 33.27
5 (Upstream) 60 62 1.84 Surcharged 21.96
5 (Downstream) 60 62.32 1.99 Surcharged 26.71
*Based on maximum calculated peak flow from V*A from each data pair Reach capacities are based on the lowest capacity segment within the reach. Refer to Table 2 below. Capacity is calculated utilizing Bentley FlowMaster with the pipe size and slope data provided by the City’s GIS system. Existing flows are applied at the upstream starting point of each sewer reach. Refer to Attachment D for calculations of peak flows for future projects.

Table 2 – Existing Sewer Capacity
Sewer Reach ID Constraining Pipe
Diameter (inch)
Constraining
Slope (%)
Existing Minimum Reach
Capacity at 80% full (cfs)
1 36 0.06 15.98
2 36 0.054 15.15
3 42 0.035 18.40
4 48 0.031 24.72
5 60 0.0172 33.39
*Refer to Appendix C for existing capacity calculations Kimley»Horn

Page 4 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Table 3 – Existing Sewer Reach Analysis
Sewer
Reach ID
Existing
Average flow
(cfs)
Calculated
Peak
Factor
Calculated
Peak Flow
(cfs)
Observed
Peak Flow
(cfs)
Observed Peak
Flow Factor
1 3.90 2.31 9.01 6.93 1.78
2 4.13 2.30 9.50 6.85 1.66
3 3.51 2.34 8.21 6.48 1.85
4 11.31 2.08 23.51 33.27 2.94
5 15.09 2.02 30.48 26.71 1.77
The existing City sewer system is very flat and sediment build up could affect the flow measurements. This could account for the variable flow measurements observed between manhole 1 and manhole 3 despite the system flowing down stream.

Analysis: Utilizing the City’s Subdivision and Engineering Design Policy Manual (1989) and Addendum from 2019, the proposed projects sewer generation can be calculated. Refer to Table 4 for proposed sewer generation.

Table 4 – Proposed Project Sewer Generation
Description Use
Category
Area
(ac)
Generation
Factor
Average
Flow (cfs)
Peak
factor
Peak
Flow
(cfs)
Proposed Project Commercial 46.21 0.0056 cfs/ac 0.26 1.80 0.47 Kimley»Horn

Page 5 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Table 5 – Downstream Analysis
Sewer
Reach ID
Reach
Capacity
(cfs)
Existing
Peak Flow
(cfs)
Existing Peak
Flow +
Project Flow
(cfs)
Existing Peak
Flow + Project
Flow +
Cumulative
Flow (cfs)
Deficiency
1 15.98 6.93 7.40 13.73 None
2 15.15 6.85 7.32 12.66 None
3 18.40 6.48 6.95 12.41 None
4 24.72 33.27 33.74 61.12
Existing
Condition
5 33.39 26.71 27.18 54.56 Cumulative
Summary: It appears that there is a backwater effect from the lift station that is affecting the flow monitoring results for manholes 4 and 5. The observed existing peak flow of 33.27 is falsely represented due a rapid drop in water level. It was indicated by the flow monitoring company that City Public Works was conducting maintenance activities on or around 8/21 that could have influenced the results. Analyzing manholes 4 and 5 starting on 8/22 provides results that are more in line with the expected behavior of the sewer system as noted in Table 6 Below.

The differences in Reported Peak Flow and Calculated peak flow are likely due to sediment at the bottom of the pipe reducing the available flow area. The flow monitoring device uses ultrasonic sensors to measure water level, and radar to measure flow velocity. The radar sensor is able to measure sediment in the pipe and calculate a true flow area.

In Table 7 below, utilizing the truncated 12- day monitoring data, shows that the project does not have an adverse impact on the City’s downstream sewer system. Reaches 4 and 5 are deficient in the cumulative condition due to several large residential developments based on City Zoning maps. These projects will need to evaluate their impact on the system and provide improvements as needed. Kimley-Horn recommends increased monitoring and maintenance of the downstream sewer system to prevent future issues.

Kimley»Horn

Page 6 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Table 6 – Truncated Flow monitoring results (8/22-9/3)
Manhole ID Downstream
Pipe Diameter
(inch)
Observed
Max Depth
(inch)
Observed Max
Velocity (ft/s)
*Calculated
Peak Flow
(cfs)
Reported
Peak Flow
(cfs)
4 48 38.41 3.95 18.87 16.44
5 (Upstream) 60 54.89 1.84 19.75 19.75
5 (Downstream) 60 55.28 1.99 15.11 20.83
*Based on maximum calculated peak flow from V*A from each data pair Table 7 – Revised Downstream Analysis
Sewer Reach
ID
Reach
Capacity (cfs)
(80% d/D)
Existing
Peak Flow
(cfs)
Existing Peak
Flow + Project
Flow (cfs)
Existing Peak Flow
+ Project Flow +
Cumulative Flow
(cfs)
Deficiency
1 15.98 6.93 7.40 13.73 None
2 15.15 6.85 7.32 12.66 None
3 18.40 6.48 6.95 12.41 None
4 24.72 16.44 19.91 44.29 Cumulative
5 33.39 20.83 21.30 48.68 Cumulative
*See Attachment C for Reach Capacity Calculations
The proposed project contributes only 2% of the existing flows and 1% of the cumulative flows.

The impact to the city sewer is an insignificant addition to the downstream system. Future projects, specifically the large subdivisions to the east of Buena Vista drive, contribute far more flow to reaches 3,4, and 5 than the proposed Riverview Market project. It is suggested that these future project analyze their impact on the downstream, and install the necessary improvements to mitigate any impacts they may have.

Kimley»Horn

Page 7 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT A
Sewer Area Study Exhibit
Kimley»Horn

ROSEDALE & COFFEE

RD - RIVERVIEW
MARKET
‹ FOR REVIEW ONLY LEGEND
1 SEWER AREA STUDY

EXHIBIT NORTH
36” PVC @ 0.06%
9/ mnN fee
2 5
M-2

18.05 AC1
F-=-) C Eti ""a,
1 TTir a
36" PVC @ 0.054%
I[
£42" RCP @ 0.075%
h
wee
25 ’oz 5
Ji
/// 11

5. 4 g42" RCP @ 0.095%;
poo I
—42" RCP @ 0.035% a “ th
8746F
52 AC
a
a. -
2 BRIMHALL ROAD

HARVEST CREEK RD

MANHOLE MONITORING LOCATION
sPRDRM A/*==========================
C- 2

40.36 A
-mm
- 2,
, - ' ' - / 'I " ' " ' ern. / —
BRiiviHALL ROAD \JEWETTA AVEMANHOLE MONITORING LOCATION #2 spummeperemmoyn eWerKHH HHHH=ET=
429
& R4
1029 --------
1 /
/
ilt:

IU
d
3 Jaee
-
_____
b p) . ,
)
I5U fit ’= Id
7)Ehl Ji
} ...

Tak"
0 RPU75
L Ear
•-get).
is 8
t -hy J.
7 -mjm
he 1,55
e.
jj
_L
t)
s\
M-2

79.22 AC
M-2

49.84 AC
#1
t-rr
"hil)
o
Lo
$7 it
2 sr
1 ws l
el
I
It
iv l—-venigaau." mn
ateresssi 94
'if
iliis SEOLAf lrt’75 •
ioe
| IF 95 L
1 i
- A
* i i» MlaIvawe
! •

PROJECT SITE
12 46.21 AC
'I
st
- !
6 2d
r t
fl
1 lOTML
42” PVC @ 0.048%
-n—
JIM
5 94
hail.

45. r s
Sews
9 J
a
c-o
Q 35
9 11-65 AC1
a
4 /
DP
n
I
Yd Ut
iUe7
d m WAate
“3
ii- "
So rn
, I
-
I
i
gereih
dlduVEi2s2
CMHHASF [HI
regie Ot
“TAE79Per""St
I
3*
Aad
. ca
N
[
Te
T7
I
—
xs.

I
L -
I
ii ___ i
su0. a 2
P*
£.
s
Fs
6 y
“I
*&R«BenWB
i
I |i H
5ar?0
T J
•POT
X[.

V $
42” RCP @ 0.035% a
E
de il
1 r
thNNs
0-555 — —I
2nt
dk
!
J
-my
S*
I M
i
V
-1-.
e I
0 p
I.

Trruer HIT
H 3 3
JU
P Ah
42” RCP @ 0.035%
th
? I
w 11 amIIu re -
■ ie
2 42” PVC @ 0.07%
2 L In 11111111 u 1111 H .
\ 7 E I
f ■I
PLAN
7 Kt
.3.
। t
“42" PVC @ 0.648% 3
13 <•? t
I
48” PVC @ 0.031% i
"IWT
/
tt
■
L. 11 ITI.11.

Nii il | DA
--
S G 20 I
Q n 1
/I
EL
tallse 3 15 16
t
TDC e !
p—oumem C
7 =
aleds a 26
-3
EHHB
99 GT
R2
% 1 4
20 22 C—2
21 226
18 17
,51 BF
19 24
M-2
। I
48” PVC @ 0.031%
□ LOTNUCUHT"— -alad—mm
3-- nlltLTD UTUlUIUn yerur — I j li 119
Il
2ie
R2
28 748 DI
29 3 2
Hl
•, AD (
30 .7
48” PVC @ 0.031% y
6 d 3 7
IIIIIID□•IP
32 4
33 48” PVC @ 0.031% M. u|ll 2 IIIIIIIIIIIII
48” PVC @ 0.031%
WLE-IL 10 ad
i
48” PVC @ 0.031%
Dte
36 4 .Tho 17
____ W4 _ 330
gours!
M!!il

NUEEEONE
27F7 QsgeteAdueHn
'’zv-. • "
IlEEK
C—2

53.32 AC
sr““T
R3
1,593
d R1
598 D.U
NCIUE
R2
118 DU
Q
o IO
CC
27 8
C-2

16.10 Al

11.25 AC
M 0
D.
ur—.
14 (1
= 5]
C-2

17.48 Al
• MANHOLE MONITORING LOCATION #3
c
M—2
107.25 AC
DJ8 me.

Ie
e.
-T
1 Hi l

BUENA VISTA RD

WHITE LN
y STIIIII
me ’
1 di
). ’I
. -2.
1-1
42” RCP @ 0.035%j
D1

17.35 Ad
25 ■ a______
VAE

WEST MING SPECIFIC PLAN
AREA
7,450 DU
L USE DIS201.7 AC

I AC OF OF
4 W 60” PVC @ 0.172%
5 I 60” PVC =
|
17 R1 000 D.U
- FUTURE
IT
" I
t 1
=3
p
eLMk - —ANsssAMA
42” PVC @ 0.236% %
UIHROSOREWCW •
e
11?
SSGmmmmcrAsEAIAEa0=42” PVC @ 0.169% =
R1 -HHHT

DU AHHHDGHH
2r ,‛s.
2804
R (LESS 1,100 DU ALREADY

CONSTRUCTED)

67.7 AC OF COMMERCIAL USES
0 U
\ [
\
35 D.U
38 AITr
p
%
-2
%
=
SSes
2 1
1 L.
tin iit r 4
5 T
1 5
T
A
1 7--\=
YC

4. a t
he
h s
9HH 1 M t
MANHOLE MONITORING LOCATION #4
J
I
5 y 0e,
JJ y lal
i
8 '1
3 2 .

E
a
tow
/DiGPrAEdhe
VAA,"""ADIL
VSPI

NXKKEKEEEE)
=unANuV
=!A
GOSFORD ROAD MC CUTCHEN RDMANHOLE MONITORING LOCATION #5 ′ y
atuBCUaSenandmnoavaauubatNWV WUWNONU—SATL fl
yat Nhr —
eute
. ■ _ 1 TH
sudHHT

I SCIIII IIIIIID EE
—GOSFORD ROAD

MC CUTCHEN RD
1 r V
F12e‘l
23819* bi
m
A
Let
4 GTMLNIDGII
TTTTi EB:

AAAAAAZV
I
5 31
35 ■
■ E
il
nEAGs
VI
$
y
A
h 19
D'
gY
1 E II
am
7 l
I-.. UA
ly.
fl l inn
dlll
WRChC)GEOLSTCE i

EESASNONNTTEES
HHKI
5 4
H
. a
i
I
41 apt
h
fIMAIf
s
Nasr
I a
-Z
\
7h
WB
a . d I r
u.
si
1 l
0 o
1 It
Ihha
II
— G9F
I
]
—
NI i
1 -=*
7 1i8
loearpargiig
--9 _= 7
0 ZHSRALCFCE-RdkOEs AAdhe
«Nadstt KBiib
AhCESSE
5 gsudneugas

MABSESFANF
L :7MI •
UCMate —
1 I
1 —0em9ed &HHHeS
3ee ____5EB
I Ar
-
$ T
IL
t
[
t
7 - I
4 r
“adi
F Y
SWKE GNVHIHAUE) ArVHHNSNGNUTNETEPe
PE W’s JUALASAbediF PirtWlMIL^
xs a “E JNUKT" EPF
2 JEdwdiOS"coudyaallameldudE,"
==s hi GNgaV ((WVFOpapus,
CUSES’YAnALan

NOBUTAFNL
9 3. W ‘Ti =5
35— | W7-Ebunt54na “had —r
E
ili
15 A AWE-BAntPAnP
g ihMM"
4 ONM/L
illlli
2Woe a
ingre d
A
«i'm'Z'r^r
s es 3 4SrM!
1 FEFOAOSE Hiii rWi r-3 gU a
IDs GIE:
dill WORAAFTTdAN!
■H suaplgue"
ME 4 Cum 970
HE PEPAEF SA9-ar-PAgM
"" EE" SPMTEV s e %. ihalgianin ueu-Al dzusavui
iTa "
277" KI
T ====== -------- —=-*•- . . ’
“*anukgECESEAZanan)., Bnelddeeac
com
2042 55
,:IMSCY * uu •mmss ■ m=—
al
gaadFaniteAr | fevsare "OsyEthe.

AAMEisus Maurag
. •( >
"E/3 aorurmustenesitHUA"
7 c.86 wvae) -7702 ;
■ •
*77
“cudee gule.

Bl msess 61 DOHOOEECHCLSLUI
i B/g
Urve.,“4
0 e6/mmr yany wiokeorl Casuy imk : "Ssee H 7. al—I • 3_ 5- AG wanootpar 1 wwa-niL
w1.
:is.

ABWEAS
AS
3,4 A Al0w**
-$
si vdi
Xs"
-5
as er 4
Ii
!5
192 MAIA IE EACALCELOL 22
e. LA SCHRUS IIS ihe 11
112 par
LliHIMR^
Tmil
gg EL!’ EEEL-
“apegtengtre . aM —
s Js
Sat
sir: J* ,
hf?
sst
Cat
3iatae GE
*
t B
o Ismr
41gu4biTT an Ai EKNSNdE AZAEA:HArJC
ME-SI atemsiva,
- s4Ne5.suime2

13.. । go y—
ET4PST(TCAM2N2 1
3, all
he T9.0.SSsl DAB jem igkddbGHCEART
il
/A’ HH susgnivng aeeey 0
D’ls’Ta ====== dl'T
gdDLdEKi"T
IMAMTEOe *1)
FiFATEA 5 id all’s' S th: 7
Till ।
.. ATCTFTFndC iasuuiwnastizzinns?
5 ARTAE 7iW. -9al
8, 47. ‘XS EEGSFEE) “I
-9 ■
=PWRs 49 “Fs Jee a ehP
l' ■I
-ue
"Y
s tat J DI"Q
UHL1 P4b5w4h/4 UEFP
d-uunivaC
id T Clare
(5% t o I —hs
e •M TELWEseus" a II tuatsanui
r
HiMARe sai < AALC Oli
% elinadnsane = 125 “Evtl.
* I M sea el aueluri ■ ■ 95555
-
1 " I- X X T’I
il- AJJEwnaeaabzogB@n@RSLILr
<1= ;:.issrf/L.Fe
Ki
U,1P abay’i
,-enetrs ‘‘s sl is mrel WT,
T,A""TUE 2 dTAC. o54/5"dhdk/ AA*kididMdhit
al
AUdBHEOSUNrDe
— wii "PNsms m,
2 #-gRNTHZrUV"FO "N
slyeet.
g9C ? SAsiliVBC. "ar
kU,“£'
•h
' utlrresMai
SNIIIIs. P’gs sersg==="=;n
AA,A054\dkdl{"ded/ KAAsOaERdGESE AJE
h -Psmtrmesssmm
_d
tel
i |Mh /' 1.
a
- ' he’s 1 2289 i
N4hi
T
TMAEnM/ -20o) anneeu J
iiiys
F “2s
1 IF s
sGbAAUL.

Fdas
gu
[IIKR-R'
■ .! I 5. .
auduge:
. iiii
sim“hWMs;
nlduny i Is Tpusineyi
|
II
y
unuyana
rjonwun
IAddnig
iniinAlinn
l ‘ 74P
-*ga05e ’ dASTBd
495FS —se lint
GAS"ASAMAItaan‘d
9,.
slhits "
iriRE
4459!
“emigecipe
59: T L .............. " .... . at
—.deem: • =
•feEi
mmnge
. rm. 4^1
9 at
‘XS
-A
er
idlodn2 ■ nienCi Ea” , “ers. Sil save 1e0)6
gird ast ® 11
mis ==
F“IaepmgsE m M .’■% i
CeUA.ZENT
320,
909 e : — as
aiomeatosey -2 5
-==
(
-5a" i
91uma
— ns *Ai
cainus’s-imutid es
—Find Sahume.
-“Seseeecd" | E T re
Huey ( ‘ samsmoieg" —eg
Remer eee . eeames-Pgat
e/Mvnt • n
461. m i:J Lhn EE »,—J 11
. —___________ —-----------------
1 • i r. - nnuranmoa
“mnC
e
iz Jawdlht). tapunapeu uBBak Iasuan) CMELSmnoosceyniond EAAAAHNNAN-...."V"HEE2NESA!"#EEECAB
as- 2: .. & A65/.% •
tePe
NgEedubgugduat
2llMewirtC
srai
E I ‘ey Sri rj nnrm. • -J
st Iomeon=====v«ui MAsENAdinCdl
...
1 a Tedrdii". —s 2idsdbdhagn
jii “nessapegasal
. 4'
1 1%
s
sets I Smm:
1 LESAE
mmigta.
tit
iba
2u
snrni
= ■* T‘.
a al A-Im/a .—“ —— re --------- ---------:
“Sa
: Ls
wmy
anilnrees"
i-s.
3 “i ud n<b mii. j E5
.... „. . EMWCutfpvuriaz
' s5— > Es - SUudian TWIT. e30nt 2
C’ Cogelliasat
1 ad
UUUTV"TNTOTWLE..O]
304"
i
O:
“ssgttaee
V 21-1a
Nelll
ras 250601 JJmeali
SVOAFAVP |"MIRRRfW|
SNFNE w"Au.
sehmre YAdsgli
5 AuAass/E. - bounlbtmucagal met eG8"HSOsn“y
-s
ei
tloos
EWRSSAE SeEBENU
helderegas
rC
“ia32 ■
mAp""sseTs,”m"eae
eeslie
29 fay
• --at-areihas astetat, “nmageof
IAl** V*1
• txi/ —i Lhdm Gis
/ fe -
je,3:

Pl."ve P
de
weatc
))
Mi

ITAEBGAAEGAL
.G.3*1414h 2
UAPATA/TP1
•
5 s J U
3 • nJ lezanroVrUE-) sp , B H 8 dhee TOwff i 44 a w , 2"S4esiEAreCAMB,:" / S-0awinqdonri*g .
elseodeteote "Iaea
MMTEEEMsti-
.., MA"WMSadudyAG"/gau.

DAGsFEAnEstEs
kmugendz-EHtA
e:
femedeis ev
i
i * em v
20ae is"bmacmbl
■ - C " -11
.03
f AENSC5GOT
‘ (Anashal,
AMSNU mirpny
"SSMNCLEr"
, ABF _W Neil 4* w
/dvdkdBTu@HOOdNGHS
iai.s
I27//Mkt mlgE22
WMOEE
.00120
XWA-—
SMMIO"s
“S’
F is
wills an532Ea
" MlyS

2. jShhae
bass
E ip-Agvy ■
sau s Gasgusssg). vnt.” ‘ ,
ssidasmttpont "
hlBome/Se Wg"yo—"seuld.
a
lioioa —t.

B93—*5
ee
xgatnteteatangoaugc.),is
_______ _____________________
FagqtlletleaH:sWpS=as“an=“"b=AKg ■
ind mmE/odemm
aazseEvwdie,"
"WWW"gireagens.1 .
"IEUTIONSEr
Tatelue
an=“M
THAiP,
“IUU*s TO7wdtst P g
A/Oii/a." .9.
-TEsn8r i "UMCa"Ake,i
.te ia * {Fetce PWEY' S3 34 Emre. Wsmesaen
rrmit i t 2 A, lb । seeae sjy.wit '‘siMi; ",6 4. - .
—mt ■
==." sete — .% rlsleses « L4 saetk wosnAaed"g
22320mglle
-4
“.relybel •' a ela U ...... • *4 s am
lys ge.
—
, . mmsskrampON! gasl
*ne“&"un
5492222.
ll
--- --ETVOFSNG/ersEAATNPANe
T “gstadmes
ENIAPE:
wihdkizd aa L... = P- 7v APn=eMS=lsEvd
AAMAW/N/LAW/SZMOEWOHL =gie Et
FUe"e,” T
— 082 ,,
sopaagyazduzmea — e AsAE05/-4*44085/£/
a* < . 255 r
a
.| MRr 1
is •woirx.ipjfthiBj LSL
“"ZWMJGWAUTHTmAS/al:93! -M
1 II"* "It*-*........... . i*is
1sodalged"dhu.. .
lyywWIfaw-y
Mli SS.-mmmne enamsssa auw"MeTECodtls F •. 55, - . ..
-9249...
a k.tbdufVOu60040
2 SAACA: - gills eamars 3g 55;
. (y
2259,5 -asde
— • -hssaaases ent igveus
—
i3eae001 La"u‘
6 he’s
1 "de ' . A‘e3;
Mian
? ta I
2 "M
o®'
i j40*in”att a e ESSe--eosj(G-PTNTrE”-----T ■ ~ ne. WasE0 . (EEung - ■ '
> AMTs Ce-L-. . e""".
nsdAnudHtserat mst""sil"e==el gjalme
200 eh Mlbdrasiales
sudbud waci, —5
90 cgga
____ — S0% wa JePF, lsed
ales 3
aa* Il
“"Thar
noS
ter Fi i
sta" “f ® EBs0
a—"ae 9 ,4 fa a)
PMAHEY:
n-o bngoen@hdsen(Ga"ggu sas
At QWAS AFeMTFF LTAi
"ousn/tinde anaLand"
■-3 3
sAREga425819VEa «ll
te
0"
244
2—1 Ia ‘I .......................... As .1 L — C = • = = .2Y asset " s!U19 SZ=gthcummmactod"age iooueestlilicd7ESnuT — SMArEDs-has “aa.. nnaazgagg ay spagammusea mommsnggagm ig 5
2 a rr

E NASANE
RaGeazandesyasjaqgondegnergammcua"ne
"ist MeeimeunawwemEeesh ie aisssgeunsante
2h ar “aNuetpGeewseaamaa“g277—54494N3g5b4y2) - ETmhici
IYPAnlats. woldrs Ji I
5y5hd. d- "S. -
GStEle
1tH
“hmoyeeT
Si
ih
G4wE"
dg92%1
ACeFB]"W (5
“secht"*"5tm
MPi7h75
B
I C
NBSGAEC 20
.fl
unde 4 dud « a,185 “M55"ee meenue
IBMENCAEASAESEEAMcEAEANOEEa
TSeS.==
E: s3
si”
is
Mi
UH
s.,"@gean@oduue £1 * FETWAAPUsec r XCSFOSAA/SL * “ St"ne 3 J gedNGyduuhdE ■ Agdsdhdb#WdteT “Adss 213 SErSSEeGHERTgNPSASELFiraaapetengngte " E-
; wns anest, sauatgutur
i BE CW2P
l—em5oNleeeisa P the 7
-tp;
eoesesmegep.
tltawabusR2“Ye.SSE.E22ss “Y2 ′ z' pl TAeRCWMCRE" &MEee".

IC EEgu IF P 2-74
2“S'*
Ary ’
Jmua
-•1.
=dutt"
Hpshto
giPLejE.

A- fUg aad
2 ze*0Eh"
A93Pue ** pr3 9—59939
AAt"dOWWO
F&dHAAkedBn# WABUASNGACA .
4£8$68//4N@5a 5
"asearAeaP-3‘1a-1 — Ta ia»«.

ZARe AWAses n s*i*e ,@4/485341
.M ■ 2 #3,44 2" & A #9ed »W e
— 1*% “37% J selnaser 4—■ **
" ’ es 7) “t 55 ” Se t440acasis
“Fi * efF*=rStr, tseded l et dey ah 15 6 LEens
wAJE"BPPIFCEE11s50".
21g8-810505a/g140/99a8394—
Hsqhhd aau
TWAJAHT —2ri
ig 1
...... , mkoisesseslanynuts—.GHTeRAmmEDe"E-cf
12 ut Hms -
=mgWTly
ISSisa WBMPWVPADAPTPE*:

Aezev hdd NdbBgEKLdha:** •
fin
- WWW*

NASENGCEMFB
hWKWMf H4 .
i'wliigteFlKT
*= ger (Poteen*«■
, . __________ _ gadhggngyavAGAEN 33.At"A .
. “% RJ -2 De gt gnrwaMftJ.
# S46ned-iMgtnu aweodudwaustt,@ata
gaghHge561—s S i
WWWMT57L="A Saerseas
t5eia
sl” "3 V—UlEE ‘
a-iemiiiiae WCetPGResasndeo
Lil
ShARgSsWEWNWXENRASCOTNEESN:
q daessuseooy 2 a02204592
dgMsar@geNedeshattje)aaaeur Wtli!"ThesEtNga(eemIns-nE

4.SINAMCVAAWA"SFssmetsoni)
smeWgadM/sena. Km JMS940.WHChbr "WAsAO-EATAARNAAO
GWalAEJP
___ _. &
AFT
i'
Ml-,
medhe
B
awtO^.11
IS EEEEFTFFY %mm*=***
ugnggg" Msi 4
------ 5uhavene eanaapl.5
=s »I ontausas MM- r meTE"P". UMK Almseaa’" * Paw 92
aaqdoguneseiTuccenou’aLsasil
G.EDIETT’
B
‘v
. ■» n-slHIHHE.il
=e"is 24 Fx 7 edeti tre Thruio
"sagsghect?-4p0201E494590408BEH8*C
• d MhAgaEesA
insaancangeials <
sl OT
1 ' P<tCKT h
IIIHMki UPRJONOAUEEac

26.92 Ci HEEI EEE
SV9APP5E .UM "ASM IIANNEAPAE s
GdHHBunORAHASSEU Heuuku Fegndh washun
“SEEAPNGNFEA"FE ARPSEEESFRA - re
#Lguuu"VLdEgpu g AL2g2ndL ; ■■
N/EAWAPSPLAEAeWESSNA:: Q
AQd—gadurar Mi.

IE jlKninu KU mmmr; II“h,
11 IIPFAF i I j fl “P“AAsi S" =
52 ERB q(Ayuuzumuqunyu
- Sil? £ mivrrzevini..... ITTFCBNEAFWNSNAFALA)AJGVPAgEB PW P . J"Oul
2 ggeeuegt EPA2"M"es"
VAebkdVdT

ODENTNCNEOO
aas
" SPUTOBABONOFONAD “ASitE EBUEANCNES T NSAZABRBYca aiHH NONULEE, "EANONONE ddHAMAE AneH-AD) [mmol "ANSHVB sggswikt g ■
NurIWII” i%37" N3i~Fuhen;doeneonVRGnFTNE
zumemeuuseaC.eaaqun #
gSKEEEEUE “n in41HgAl

GBEEOEEESWE
dzEbuiE
REECE ESLdD
HEE till
•- GEANNNAFAEAHRB
(ghazeral

IIIRIIIRIIIR'
EdGBCNAEsEGBMEAGAEGSLASAUSAG
.mn MACE TShE: STn€ । FSeSPKAY44 EWWBALdFFS
EAEEELE EEEEHEDZSeEd
BKESSNES KRSACCAEANAE!
dCGdbWdWgROLELCESDHGGEAEd4N4S ,________________
'_____ WMf• 2558
Pt h SESe
t54esi SAANu
iKHi
wr «aLk wus 3050';«»lldtt
BitM-SU® E W r > J sM ii MUNEVEE
StWllMMfi Iff! f FDSd . —tneorksuitr "35840 seiruee
Aanan AdNekLEd-41W e
It pw
„ — JS8 YZEdSi
“ait EHns —wtOMM'
Il EEMtEHBiEet
IM Eksijangaisa
: TEemgti
1 PidNkdent
PI l TA41/V ; “ ALd5(s 0
CDGelsbeGeh.TWtm si b—.

WFKACIGFGENSA# IE=
EFME-e.

ENEsEECCEB
[ExhdHSnzEE
EdEHi "UEESR-m
ASRAAUFLESEE CrSAANL
Ute tin (ONE E"EUTEOE (MGTVKT
■IIIIIIIIIII
Tug,(uznev
WWitk
mi m .i
Weessun)
WHS
w"VEEEEEEEFECFZLEEBLMFALEEESEDEEEGR
CCAEuTr LMikK
IB5* * “4 have “resedity? We
e)@BGBU,TE"■
WLE,

1.22 1
=el
mmnplinefl
IRIMRWIRI^
(IEUAARSSAE
scuhgluganepat
. ."ARdedkd@tARuEMCE.
d E BPCBBFTMOrONZ SI =
29ns49anga nmstiH
ruusdauere Daupuptie
M-lfkflhACDdBacal
SLdehj qndnB22.:

UNEne MS WEF 2 ;:
. * Reetge 445 get a-...

A E KOWBAACOWYA: iMbKiHiilif nolloguugeugp
AA"HEE(C2C"NE
• - gtrips
t= aLdueni
: ISRULgR49/MAL/E1,1 — —======dIi EPERNNEEFTFETNZ & -? gE2RaS04P43 deeme t PWTIT litinot itts Bsongujanany aetpeero"**
Austlstalacu ..im
«'ndiwitPinruiKGEcr *F
~: = 'MM4S Zleutd
&J —IActdrusidde.Eisu
trip v<nMiii<v:* SUE""
u5 UdBGBAFAPAP he ZBAPIEBSs
CE-L"IC (duhgqunaqepdn y — AWNdee Wubus
tanEz ATAE"SSEANAMAO"
anrdhd IIBahe
E4s
MPPANNOTE""
“3 i Taaalf@terdundE ’• is 7 ■ ′ J
CWppgSsLIPWAASSE,
Sit Kughguge giW PsdzNddngnaka
ANN SNAMPANL,S—LAPESENBOD"angD)Y
dAOENCEECEEAdNE
. ADAGEAAONGeCOAN!
ZGEEEAnkOAEOGs
ANSFWGGDECAOOSAUTDSE" NTY,
XAggugyERELGRSBSNSASE
A"S=pBONSDRPOHGAC,VOSEDSNWNGP"?
Pagudogsyaguauanan
PoeusuuudanegzugHGm)S.STNMGGBGWOROS
yEEHRUNSRCNAUr, WomAFEK.dBAP
TALEEsndk(DAEOGC)
Iatcratie)?
eepqendadoMugezhdhukt Mumu
EAEAnduNEABGeEHA HEPurwqutGat
il si nil •
E&MUENOCE CFCNEEWFId/5,
DAABkdueunduean@Bsl
i . .. -.i IIIIIRIIRUIIR

SIIIIIIIIIIIIH
nioiuiiiwinm
“Neaadgas
: 7MHAnjmtgududulizut,idei(in
I SNDHMDHN: 17 10] 2 „ TL ui
EEEACEEUgggdragh
TtUL^MIrS
I ME WSAEEZNUsEHedgi
254M4/1’
ASRgy
*=SEEEEETnAUBASOET"NOUdOME
IWWESESOSESEsP.
- "LdedededidL |
213522202
4383505
salllass:
thepu,"AMuvdtandwop SAEeiHANANS 7= &E; is % -am; gaC “ marpus il “““Aogupqngn -wesss ——"2 —
imiinniHiiiiiaii mill
iliwalto‘‘s S5239—2/AscmanEzas
Play
J •« == -
Shesnesad?ne
M I sgspensjcunseg W U
sales—i.
it "ET T
1A91
. ?N
MMOpdOn 805 SWlittlMl
1- -.r ww
i
50 Th
• gi
•’1
y
n
P

SHEET NUMBER
J g
CIVIL
10OF
No. 81751
Fxp 3/31/26
P6C
ROESS/0,
SRETGo,

PROJECT AREAEXISTING SEWER MAIN PERTINENT TO STUDYEXISTING CITY SEWER MAIN

X SEWER REACH IDENTIFIER

FUTURE DEVELOPMENT PARCEL ID
Ip

GRAPHIC SCALE IN FEET
0 1000 2000 4000
Know what's below.

Call 811 before you dig.

AREA RESERVED FOR

CITY APPROVAL STAMP
0 v
1 Y
s
8 - 7 -• ■ EL-2 !
F
/
t
“MAMe2rTPPg
- udaent —Ellim".

CABAKERSFIELD BBG CHECKED BY
ID.ML
DESIGNED BYlD,SL,ML

DRAWN BY

AS SHOWN SCALE

KHA PROJECT
195445003
DATE
10/2/2025
BYDATEREVISIONSNo.

Kimley>»Horn
2025 KIMLEY-HORN AND ASSOCIATES, INC.
1100 W TOWN AND COUNTRY ROAD,SUITE 700,
ORANGE, CA 92868
PHONE: 714-939-1030
WWW.KIMLEY-HORN.COM

Page 8 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT B
City Zoning Map
Kimley»Horn
6 7
7 6
7 7
7 6
6 7
2 6
8 1
6 8
9 5
3 7
6 2
6 8
1 5
5 2
9 9
1 1
9 1
9 5
4 4
9 3
5 2
1 6
1 8
5 3
3 9
3 4
5 2
2 2
8 8
4 5
7 3
4 6
3 1
7 4
4 8
2 7
3 8 9
8 3 2
9 4
1 6
5 2
4 1
9 8
7 1
3 1
2 1
8 6
2 5
4 6
3 2
5 5
8 5
4 9 7
11 11
11 11
11 11
11 11
11 11
11 11
11 30
18 19
31 19
19 18
18 30
18 19
31 30
19 31
31 18
31 31
19 30
19 18
30 31
18 31
30 20
32 19
30 33
17 31
15 19
19 16
30 18
13 12
17 32
30 29
20 14
29 23
14 25
27 31
23 24
17 36
19 21
10 31
24 36
13 29
14 25
12 10
21 10
20 12
10 24
35 34
22 15
12 15
23 23
15 14
20 22
12 32
13 21
16 10
16 22
24 32
15 14
22 23
18 18
34 23
20 17
35 27
29 16
33 36
31 13
21 10
10 24
34 16
24 30
12 13
36 26
12 22
33 16
15 12
19 17
28 21
32 24
36 20
26 28
35 34
13 17
33 13
26 18 14
33 22
13 36
13 12
28 13
35 26
14 34
23 12
25 33
26 35
14 10
22 29
20 25
35 21
30 34
12 27
20 23 24
16 10
17 27
35 25
29 26
16 21
32 17
27 32
36 33
27 33
12 22
34 17
32 23
15 33
13 24
12 23
25 16
36 25
34 26
35 32
36 36
24 29
10 35
32 15
34 27
34 28
35 33
14 14
32 26
23 29
26 17
35 21
15 27 29 27
25 14
20 16
34 28
36 22
20 28
24 29
20 21
22 25
23 13
26 28
36 15
14 25
18 17
25 27
35 24
35 28
28 26
10 26
30 33
31 29
32 25
36 28
36 20
Bakersfield
Municipal Airport
Walter Stiern
Middle School
Stockdale
High School
Frontier
High School
Rosedale
Middle School
Bakersfield
Christian
High School
Independence
High
School
Ridgeview
High
School
Tevis
Junior High
School
Earl Warren
Junior High
School
Actis
Junior High
School
West High
School
Liberty
High
School
Fruitvale
Junior High
School
Centennial
High
School
Norris Middle
School
North High
School
Standard
Middle
School
Garces
Memorial
High School
Bakersfield
High School
South High
School
Greenfield
Middle
School
Valle Verde
Elementary
School
Olivier
Middle School
Golden Valley
High School
Mira Monte
High
School
Fairfax
Middle
School
Edison
Middle School
Foothill
High
School
East
Bakersfield
High School
Highland
High School
California State
University
Bakersfield
Lakeside
Elementary
School
Sunset
Elementary
School
Zephyr Lane
Elementary
School
Bakersfield
Community
College
Del Oro
High
School
Crescent
Elementary School
and Middle School

ROBERTS LN
4TH ST

AKERS RD

HUGHES LN

S KING ST

JEWETTA AVE

PALM ST
A ST
H ST

MOUNTAIN VISTA DR

WASHINGTON ST

S REAL RD

PETROL RD

REAL RD

PLANZ RD

PATTON WAY

E PACHECO RD

BUCK OWENS BLVD

DOWNING AVE

LODEN DR

LARIMAR
LARIMAR  DR
DR

HIGHGATE

PARK BLVD
F ST

SHANNON DR
21ST ST

SPARKS ST

ALTA VISTA DR

PACHECO RD

NORRISRD

ETCHART RD

UNIVERSI T Y AVE

PARK BLVD

PIN OAK

MONTCLAIR ST

BERNARD ST
N
E
L
RIO
D
R

HABECKER RD

E PETROL RD

MIRAMONTE
DR

HIGHLAND KNOLLS
DR
EL
PO

RTAL DR
N

ORRISRD

VIRGINIA AVE

BELLE TERRACE

HALEY ST

CHASE AVE

PIONEER DR

REDBANK RD
RIV
E
R
L
A
K
E
S
D
R

EBERLE RD

COLLEGE AVE

AKERS RD

AUBURN ST

STERLING RD

VERDUGO LN
G
R
A
N
D

LAKES AVE

BOLTHOUSE DR

MONITOR ST

MONICA ST

ZEPHYR LN
H

AGGIN OAKS
B
LVD

MEANY AVE

EROBERTS LN

MC CRAY ST

STOCKDALE RANCH
D
R

S LAURELGLEN BLVD

MC KEE RD
R

IVERRUN BLVD

LILY DR

LANDCO DR
C
LAY

PATRICK FARR WAY
34TH ST

RUDD AVE

OILDALE DR

JENKINS RD

NORIEGA RD

RIVANI DR
Q ST

BERKSHIRE RD

MOUNTAIN

RIDGE DR

BRECKENRIDGE RD

BRECKENRIDGERD

SHANE ST
S P ST
P
E

GAS US DR

PALM AVE
S
TIN
E
R
D

MEACHAM RD
EASTON
DR

N LAURELGLEN BLVD

QUANTICO AVE

REINA RD

WATTS DR

CAMPUSPARK DR
PAR
K

VIEW DR

WENATCHEE AVE

FAIRVIEW RD
GRAND
CANYON
D
R

HANGER WAY

RELIANCE DR

DAY AVE

RIDGEOAK
DR
E 4TH ST

STANDARD ST

BAKER ST

OLD FARM RD

OLYMPIA DR

WILSON RD

WHARTON AVE

DECATURST

DRIVER RD

JOHNSON RD
LINKS
DR
P ST

E FAIRVIEW RD

QUAIL CREEK RD

BERKSHIRE RD

HARRIS RD
WHITE
OAK DR

C OSTAJO
RD

CHERRY AVE

DEER PEAK
DR
S

HALF MOON DR

W DAY AVE
N
C
H
EST
E
R
EXT
AV
E

PETROL RD

CHAMBER
BLVD

E BERKSHIRE RD

EDISON HWY

SULLIVAN RD

ALLEN RD

W COLUMBUS ST
S H ST
E
L
T
O
R
O
VIE
J
O
R
D

GRANITEFALLS DR

SIDDING RD
D
A
Y
T
O
N
A
D
R

FLOWER ST

HUGHES LN

HIGHGATE PARK
BLVD

E BELLE TERRACE

QUINN RD

SUMNER ST

CAMIN O MEDIA
VIC
T
O
R
S
T
S
OIL
D
A
L
E
D
R

HALL RD

DISTRICT BLVD

VEGA MEADOWS RD
WINGS
WAY

KNUDSEN DR
N

HALFMOON DR

GILMORE
AVE

MEACHAM RD

S STERLING RD

SHALANE AVE

PENSINGER RD
SCARL
E
T
OAK
B
L
V
D

PANORAMA DR

STATE RD
S
W
A
S
HIN
G
T
O
N
S
T

LA COSTA ST

BRAE BURN
DR

E FAIRVIEW RD

MILLS DR
MAY ST

W SUMNER ST

SK YWAY DR
WIN
D
E
R
M
E
RE
ST

CITY HILLS DR

E NORRIS RD
B
E
D
F
O
R
D
G

REEN DR

HOVINGHAMDR

MC KEE RD

GOLDEN STATE HWY

LINDSAY RD

NORIEGA RD

E WILSON RD
N
SIL
L
E
C
T
AVE

CURNOW RD

VINEYARD ST

MADISON ST

SUPERIOR RD

MEACHAM RD
MC KEE
RD

NORIEGA RD

S ACO RD
S
H
E
AT
H
R
D

E PLANZ RD

ROMERO RD

MARELLA
WAY

JAUNT AVE

TRUXTUN AVE
S
W
E
GIS
AV
E

KIRKCALDYDR

BRITTAN RD

PIONEER DR
M
A
DIS
O
N
AV
E

BRENTWOOD DR

BRUNO ST

E WHITE
LN
R
O
S
E

DALE RANCH PKWY

BOUGHTON DR

SILLECT AVE

KIRKCALDY
DR

WING S WAY

SNOW RD

MUIRLANDS
PKWY

ZERKER RD

CUDA DR

WEGIS AVE

BAKER RD

COBB RD

E MC KEE RD

PALM AVE

ROMANINI RD

HYLTON LN

LAMB AVE

BEECH AVE

KERRNITA RD

LANDINGS WAY

COLONY ST

KAM AVE

VAN HORN RD

E CURNOW RD

HARMON RD

PROGRESS RD

CHEVALIER RD

WILDMAN RD

MUNZER RD

RUDD AVE

STINE RD

CHINA GRADE LOOP

COLUMBUS ST

BRUNDAGE LN

ROSEDALE HWY

BRIMHALL RD

CALLOWAY DR

GOSFORD RD

COFFEE RD

PALADINO DR
M
ORNING
DR

STOCKDALE HWY

E BRUNDAGE LN

OLIVE DR

PANAMA RD

S UNION AVE

MONTEREY ST

WIBLE RD

MERLE HAGGARD DR

FRUITVALE AVE

E CALIFORNIA AVE

NILES ST

HAGEMAN RD

AIRPORT DR

PANAMA LN

RIVER BLVD

ALLEN RD
W
NILES
ST

BEALE AVE

UNION AVE

SHAFTER RD

MING AVE

HOUGHTON RD

HOSKING AVE

MT VERNON AVE

SNOW RD

SANTA FE WAY

WHITE LN

DR MARTIN LUTHER KING JR BLVD

TAFT HWY

S EDISON RD

EDISON HWY

ASHE RD
MO
H
AW
K
S
T

OSWELL ST

NORD AVE

S CHESTER AVE

CALIFORNIA AVE

HEATH RD

S MT VERNON AVE

N CHESTER AVE

BUENA VISTA RD
FAI
R
F
A
X
R
D

MASTERSON ST

COTTONWOOD RD

MC CUTCHEN RD

DI GIORGIO RD

SEVENTH STANDARD RD

GOSFORD RD
O
L
D
RIV
E
R
R
D

TRUXTUN AVE

RENFRO RD

S FAIRFAX RD

JAMES RD
OAK ST

CHESTER AVE

CASA LOMA DR

MOUNTAIN VIEW RD
S H ST

S COMANCHE DR

VINELAND RD

BUENA VISTA BLVD
M
A
N
O
R
ST

NEW STINE RD

LAKE MING RD

S GRANITERD

E HOSKING AVE

E TRUXTUN AVE

ZACHARY AVE

S ALLEN RD

PANORAMA DR

GREELEY RD

E PANAMA LN

ASHE RD

W CHINA GRADE LOOP

BRIMHALL RD

SHAFTER RD

S VINELAND RD

SEVENTH STANDARD RD

OLD RIVER RD

MULLER RD

WIBLE RD

STINE RD

EDISON RD

E WHITE LN

S RENFRO RD
C
O
MA
N
C
H
E
DR
S H ST

DRIVER RD

KRATZMEYER RD

HAGEMAN RD

S OSWELL ST

SUPERIOR RD

HERMOSA RD

SHAFTER RD

SUNSET BLVD

RANCHERIA RD

TEJON HWY

E SHAFTER RD

ENGLE RD

S VINELAND RD

REDBANK RD

ADOBE RD

WEIDENBACH ST

E PANAMA LN
RO
U
N

DMOUNTAIN RD

SEVENTH STANDARD RD

TAFT HWY

ALFRED HARRELL HWY

GOLDEN STATE AVE

UNION AVE
178 HWY

WEEDPATCH HWY
GOLDEN

STATE AVE

WEEDPATCH HWY

TAFT HWY
24TH
ST

GOLDEN STATE AVE

MORNING DR

ENOS LN

MAIN ST
24TH
ST 23RD ST
24TH 24TH ST
ST
24TH
ST
24TH
ST

GOLDEN STATE HWY
24TH
ST

S ENOS LN

KERN CANYON RD

STOCKDALE HWY
24TH ST
65 HWY

WESTSIDE PKWY
5 FWY N

CENTENNIAL

CORRIDORFWY
99 FWY N
178FWYE
99 FWY S
58 FWY E
58 FWY W
58 W
FWY W

WESTSIDE PKWY

CENTENNIALCORRIDORFWY

CENTENNIAL

CORRIDOR
FWY
5 FWY S
178FWY W
LEGEND
Commercial Zone Designations
C-O Commercial and Professional Office
C-O-HD Commercial and Professional Office - Hillside Development Overlay C-O/P.C.D. Combining
C-1 Limited Commercial
C-1/P.C.D. Combining
C-1/P.C.D.-HD Combining
C-1-P Limited Commercial - Parking Overlay
C-2 Commercial
C-2/P.C.D. Combining
C-2/P.C.D. Combining - Hillside Development Overlay
C-2-FP-S Commercial - Flood Plain Secondary Overlay
C-2-HD Commercial - Hillside Development Overlay
C-2-MH Commercial - Mobile Home Overlay
C-B Central Business
C-C Civic Center
C-C Combining
C-C Combining -Petroleum Extraction Overlay
P.C.D. Planned Commercial Development
MX-1 Mixed Use Neighborhood
MX-2 Mixed Use Transit
Industrial Zone Designations
M-1 Light Manufacturing
M-1-AA Light Manufacturing - Airport Approach Overlay
M-1-FP-S Light Manufacturing - Flood Plan Secondary Overlay M-1-MH Light Manufacturing - Mobile Home Overlay
M-1-T Light Manufacturing - Trailer Park Overlay
M-2 General Manufacturing
M-2-AA General Manufacturing - Airport Approach Overlay M-3 Heavy Industrial
Resource Zone Designations
A Agricultural
A-MH Agriculture - Mobile Home Overlay
A-FP-S Agricultural - Flood Plain Secondary Overlay
A-FP-S-HD Agricultural - Flood Plain Secondary and Hillside Development Overlay A-HD Agricultural - Hillside Development Overlay
A-AA Agricultural - Airport Approach Overlay
A-20A Agricultural - 20 acre minimum
A-20A-FP-S Agricultural - 20 acre minimum - Flood Plain Secondary Overlay A-20A-HD Agricultural - 20 acre minimum - Hillside Development Overlay A-WR Agricultural - Water Recharge Combining
OS Open Space
OS-FP-S Open Space - Flood Plain Secondary Overlay
OS-HD Open Space - Hillside Development Overlay
Residential Zone Designations
E Estate One Family Dwelling
E-.5A Estate One Family Dwelling - .5 acre minimum
E-1A Estate One Family Dwelling - 1 acre minimum
E-2.5A Estate One Family Dwelling - 2.5 acre minimum
E-2.5A-MH Estate One Family Dwelling - 2.5 acre minimum - Mobile Home Overlay E (10,000) Estate One Family Dwelling - 10,000 sq. ft. minimum E-10 Estate One Family Dwelling - 10 acre minimum
E (14,000) Estate One Family Dwelling - 14,000 sq. ft. minimum E-HD Estate One Family Dwelling - Hillside Development Overlay E-CH Estate One Family Dwelling - Church Overlay
E-PE Estate-Petroleum Extraction Overlay
R-S Residential Suburban - 0-2 dwelling units/net acre
R-S-1A Residential Suburban - 1 acre minimum
R-S-1A-CH Residential Suburban - 1 acre minimum - Church Overlay R-S-1A-FP-S Residential Suburban - 1 acre minimum - Flood Plain Secondary Overlay R-S-1A-MH Residential Suburban-1acre minimum-Mobile Home Overlay R-S-2.5A Residential Suburban - 2.5 acre minimum
R-S-2.5A-FP-S Residential Suburban - 2.5 acre minimum - Flood Plain Secondary Overlay R-S-2.5A-CH-FP-S Residential Suburban - 2.5 acre minimum - Church and Flood Plain Secondary Overlay R-S-2.5A-HD Residential Suburban - 2.5 acre minimum - Hillside Development Overlay R-S-5A Residential Suburban - 5 acre minimum
R-S-5A-FP-S Residential Suburban - 5 acre minimum - Flood Plain Secondary Overlay R-S-5A-MH Residential Suburban - 5 acre minimum - Mobile Home Overlay R-S-10A Residential Suburban - 10 acre minimum
R-S-10A-HD Residential Suburban - 10 acre minimum - Hillside Development Overlay R-S-20A Residential Suburban - 20 acre minimum
R-1 Single-Unit Dwelling - 2.1-6 dwelling units/net acre R-1 (4.5) Single-Unit Dwelling - 4500 s.f. minimum
R-1(8,500) Single-Unit Dwelling - 8,500 sq. ft. minimum R-1(10,000) Single-Unit Dwelling - 10,000 sq. ft. minimum R-1(12,000) Single-Unit Dwelling - 12,000 sq. ft. minimum R-1(18,000) Single-Unit Dwelling - 18,000 sq. ft. minimum R-1-CH Single-Unit Dwelling - Church Overlay
R-1-CH-HD Single-Unit Dwelling - Church and Hillside Development Overlay R-1-FP-S Single-Unit Dwelling - Flood Plain Secondary Overlay R-1-FP-S-HD Single-UnitDwelling - Flood Plain Secondary and Hillside Development Overlay R-1-HD Single-Unit Dwelling - Hillside Development Overlay R-1-HOSP Single-Unit Dwelling - Hospital Overlay
R-1-P Single-Unit Dwelling - Parking Overlay
R-1/P.U.D. Combining
R-1/P.U.D. Combining - Flood Plain Secondary Overlay
R-1/P.U.D. Combining - Hillside Development Overlay
R-1-SC Single-Unit Dwelling - Senior Citizen Overlay
R-1(4.5)/P.U.D. Combining
R-2 Small Lot Single-Unit Dwelling Zone - 6.1-13 dwelling units/net acre R-2-CH Small Lot Single-Unit Dwelling Zone - 6.1-13 dwelling units/net acre - Church Overlay Zone R-2-HD Small Lot Single-Unit Dwelling Zone - 6.1-13 dwelling units/net acre - Hillside Development Overlay R-2-MH Small Lot Single-Unit Dwelling Zone- 6.1-13 dwelling units/net acre - Mobile Home Overlay R-2-P Small Lot Single-Unit Dwelling Zone - 6.1-13 dwelling units/net acre - Parking Overlay R-2/P.U.D. Combining
R-2/P.U.D. Combining - Hillside Development Overlay
R-2-SC Small Lot Single-Unit Dwelling Zone - 6.1-13 dwelling units/net acre - Senior Citizen Overlay R-3 Medium Density Multi-Unit Dwelling Zone - 13.1-20 dwelling units/net acre R-3-SC Limited Multiple Family Dwelling Zone - 13.1-20 dwelling units/net acre - Senior Citizen R-3-CH Limited Multiple Family Dwelling Zone - 13.1-20 dwelling units/net acre - Church Overlay R-3-MH Limited Multiple Family Dwelling Zone - 13.1-20 dwelling units/net acre - Mobile Home Overlay R-3-P Limited Multiple Family Dwelling Zone - 13.1-20 dwelling units/net acre - Parking Overlay R-3/P.U.D. Combining
R-3-HD Limited Multiple Family Dwelling Zone - 13.1-20 dwelling units/net acre - Hillside Development Overlay R-4 High Density Multi-Unit Dwelling Zone - 20.1-30 dwelling units/net acre R-4/P.U.D. Combining
R-4-HD High Density Multi-Unit Dwelling Zone - 20.1-30 dwelling units/net acre - Hillside Development Overlay R-5 Very High Density Multi-Unit Dwelling - 30.1-50 dwelling units/net acre P.U.D. Planned Unit Development
MH Mobile Home
TT Travel Trailer Park
R-H Residential Holding
Other/Public Zone Designations
DI Drilling Island
FP-P Flood Plain Primary
FP-S Flood Plain Secondary
HOSP Hospital
P Parking
RE Recreation
West Ming Specific Plan
WM-R1 One Family Dwelling Zone
WM-R2 Limited Multiple Family Dwelling Zone - Lower to Medium Density WM-R3 Limited Multi-Family Dwelling Zone - Medium to Higher Density WM-CO Professional and Administrative Office Zone
WM-GC General Commercial Zone
WM-TC Town Center Zone
WM-SU Special Use Zone

SPHERE OF INFLUENCE

CITY LIMITS

SPECIFIC PLANS
Date Saved: 3/4/2025

OFFICIAL ZONING MAP
- CITY OF BAKERSFIELD -
4 0 4,000 8,000
Feet
1:48,000
Prepared by the City of Bakersfield, CA
Planning Division of the Community Services Department
The City of Bakersfield makes no warranty, representation or guarantee regarding the accuracy of this map. This map is intended for display purposes only and does not replace official recorded documents.

Path: R:\User_Projects\Developmental_Services\Planning\ZNG Work File\ZoningMap_42x60\ZoningMap_42x60.aprx Name: ZoningMap_42x60
to
s
$ 0
W<
4 ii
I
—4
I
t
—
|
Dsy
7l
fits
I
I

BAKERSFIELD

DEVELOPMENT SERVICES
i
i
L
1 I
I
I
1 I
I
-
1 \
1 I
I
I- —I---------
N
1 1
-H—
/
am
/VW
-I
L L

D QLO I
H
II 9 id
1 !B
Cl!
C 2 [ 5 i8 'BESH
n z OiBB ke3! 0—
I
w eraAEIm
eml l
_ —— koswlss(wMt7) SHE m===kn
i
4 r iiL !
EaMer - IEE
MX Jnjgeiigj LJ A—he, UR— y: 50 SEEE
—1—)"

IIIIIL UT UJJUU,
E Mg- SO
W
UUU O0
0 Gmaln, ‘4 arw •eml EEIXHK _____ I mue STe••Ei DEc DDEI IS I WL #
IBSEHI
RRs
i _D
aTAE-uemgA lLDLODD = nelen =-== AA UU—Loue UU-H JJLA aSS iMMB ill.

D J[ if S IEMNI
T-(Z
rnnnn SHHES ======== ][
•JiIIIEEEEE===TTY ••lEH=E=.ILV = mr remm. mr rr l—> ----- — -- -- ,------ _-- ..—,.—___ ___ , RtPgi LM_B
Y mnnUUUnni
EEL •L 00 “OI ILLEII : OE.” 5Ll
E SXLEOOIIm VOAOLEIEEEIL A0== 1 s==l OO
OOO OE5E
■n mm mmm mi----------1 —V L-D- I t.aE=mEED
9 STEDMA
)
wzyde =====—IE—II—= T”Aofe aemgAic"EII MMH“TITS_Eiglgemi hiilHiE EEsi j . a® ill EEeag !
(
3 / Y
1 HIM
U
oaln |ATMHSH AnHTHHHE i VLMMLZx •0 2 LLsFg! i —
1 dp "5’— i
] _M I"Ii 5p l.

E
(
W
1 -h • m • • mn 00.
-11
E IM
a
—u"
1 | a wASLLAH TTgaiiu J - — P — — - 11----------------------- 7---------------------- ..-------------- 5---------2-------.;------—--------------------------Ie:
77- Mas
/ MHra wa (UH070 MM
I
"
IPP A 7a □M3 URHHmD- WHO IK MI
TT "=5527 l
•KLIHOdI
11 Nh
i
C HR inL nrnUi
C UUHOD nil
(OEi I GLTr_.

L
nu'HH
[
J
!r D iBB
I
> ■ ■ >
> <
X X a •I
/ 10,1 > <
ll
DP l!
I
I
II
(
I
I 2 I II
r |
- I-i
BH
IS0BI
■ ■■■■HUBS
■ lllllll
i
|
i
I
i
i
I
I
l
I
I
I
I!
l!
I
I
/i
/i
i
I
iL
m
JC
][
aD
IKnOBI
EEEBI
|
i
i
i
t
i
IIEEEHEMmF
•llOHHHUEHEEA •IIIIOIHHEL’AD
dO
J
l =====
Kr— Jw
EEEEE Lese
I
I
BI
I
i I
i
(
(s .
___ olgudP
T——LE— [[TOJLDLE a
l
i
i
i
yi
ii
X OX
XX) > x)
।
।
।
I
I
I
I
I
I
I
I
I
I
I
I
il SDraeRrR i__I === ========= । SE UE====EEEEEE • •===== she ——=========== HmE===HEeAD imadmII
V
s
• l \
t)sAt
(
ununeen“,thEEE"
•IOIIOIDI6
•OOOOIIOIE
IIOEELB.

ILLEEEEEmHmr

1..
1 g igmes== E IRDDEEnT

I VHH I A
J II
I
II
1 II X J’I
%
X
II
X
—7—— maa__
J
N 1 ZR /
I
• i
a
H
ii
i
ii
i 1///
ii
DO i II ■llliCHMli illll aliiilaiL
AliHLEINL MIIHinilll HIIBIII 1llAIDEsWl=HDDUE

Page 9 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT C
Pipe Reach Calculations
Kimley»Horn
Reach 1
Project Description
Manning
Formula Friction Method
Solve For Discharge
Input Data
Roughness Coefficient 0.013
Channel Slope 0.060 %
Normal Depth 28.8 in
Diameter 36.0 in
Results
Discharge 15.97 cfs
Flow Area 6.1 ft²
Wetted Perimeter 6.6 ft
Hydraulic Radius 11.0 in
Top Width 2.40 ft
Critical Depth 15.3 in
Percent Full 80.0 %
Critical Slope 0.404 %
Velocity 2.63 ft/s
Velocity Head 0.11 ft
Specific Energy 2.51 ft
Froude Number 0.292
Maximum Discharge 17.57 cfs
Discharge Full 16.34 cfs
Slope Full 0.057 %
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 28.8 in
Critical Depth 15.3 in
Channel Slope 0.060 %
Critical Slope 0.404 %
27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
11/4/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Untitled1.fm8 Center
Reach 2
Project Description
Manning
Formula Friction Method
Solve For Discharge
Input Data
Roughness Coefficient 0.013
Channel Slope 0.054 %
Normal Depth 28.8 in
Diameter 36.0 in
Results
Discharge 15.15 cfs
Flow Area 6.1 ft²
Wetted Perimeter 6.6 ft
Hydraulic Radius 11.0 in
Top Width 2.40 ft
Critical Depth 14.9 in
Percent Full 80.0 %
Critical Slope 0.402 %
Velocity 2.50 ft/s
Velocity Head 0.10 ft
Specific Energy 2.50 ft
Froude Number 0.277
Maximum Discharge 16.67 cfs
Discharge Full 15.50 cfs
Slope Full 0.052 %
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 28.8 in
Critical Depth 14.9 in
Channel Slope 0.054 %
Critical Slope 0.402 %
27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
11/4/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Untitled1.fm8 Center
Reach 3
Project Description
Manning
Formula Friction Method
Solve For Discharge
Input Data
Roughness Coefficient 0.013
Channel Slope 0.035 %
Normal Depth 33.6 in
Diameter 42.0 in
Results
Discharge 18.40 cfs
Flow Area 8.3 ft²
Wetted Perimeter 7.8 ft
Hydraulic Radius 12.8 in
Top Width 2.80 ft
Critical Depth 15.7 in
Percent Full 80.0 %
Critical Slope 0.375 %
Velocity 2.23 ft/s
Velocity Head 0.08 ft
Specific Energy 2.88 ft
Froude Number 0.229
Maximum Discharge 20.25 cfs
Discharge Full 18.82 cfs
Slope Full 0.033 %
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 33.6 in
Critical Depth 15.7 in
Channel Slope 0.035 %
Critical Slope 0.375 %
27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
11/4/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Untitled1.fm8 Center
Reach 4
Project Description
Manning
Formula Friction Method
Solve For Discharge
Input Data
Roughness Coefficient 0.013
Channel Slope 0.031 %
Normal Depth 38.4 in
Diameter 48.0 in
Results
Discharge 24.72 cfs
Flow Area 10.8 ft²
Wetted Perimeter 8.9 ft
Hydraulic Radius 14.6 in
Top Width 3.20 ft
Critical Depth 17.6 in
Percent Full 80.0 %
Critical Slope 0.358 %
Velocity 2.29 ft/s
Velocity Head 0.08 ft
Specific Energy 3.28 ft
Froude Number 0.220
Maximum Discharge 27.20 cfs
Discharge Full 25.29 cfs
Slope Full 0.030 %
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 38.4 in
Critical Depth 17.6 in
Channel Slope 0.031 %
Critical Slope 0.358 %
27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
11/4/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Untitled1.fm8 Center
Reach 5
Project Description
Manning
Formula Friction Method
Solve For Discharge
Input Data
Roughness Coefficient 0.013
Channel Slope 0.017 %
Normal Depth 48.0 in
Diameter 60.0 in
Results
Discharge 33.39 cfs
Flow Area 16.8 ft²
Wetted Perimeter 11.1 ft
Hydraulic Radius 18.3 in
Top Width 4.00 ft
Critical Depth 19.3 in
Percent Full 80.0 %
Critical Slope 0.329 %
Velocity 1.98 ft/s
Velocity Head 0.06 ft
Specific Energy 4.06 ft
Froude Number 0.170
Maximum Discharge 36.74 cfs
Discharge Full 34.15 cfs
Slope Full 0.016 %
Flow Type Subcritical
GVF Input Data
Downstream Depth 0.0 in
Length 0.0 ft
Number Of Steps 0
GVF Output Data
Upstream Depth 0.0 in
Profile Description N/A
Profile Headloss 0.00 ft
Average End Depth Over Rise 0.0 %
Normal Depth Over Rise 0.0 %
Downstream Velocity 0.00 ft/s
Upstream Velocity 0.00 ft/s
Normal Depth 48.0 in
Critical Depth 19.3 in
Channel Slope 0.017 %
Critical Slope 0.329 %
27 Siemon Company Drive Suite 200 W Page 1 of 1
Watertown, CT 06795 USA +1-203-755-1666
11/4/2025
FlowMaster
[10.03.00.03]
Bentley Systems, Inc. Haestad Methods Solution
Untitled1.fm8 Center

Page 10 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT D
Future Project Flow Calculations
Kimley»Horn
ID Description Zoning Generation Type Area Unit Flow Factor Peak Factor Average Daily (CFS) Peak Flow (CFS) Tributary Reach 1 Project Site - Commerical C-2 Commerical 46.21 CFS/AC 0.0056 1.80 0.26 0.47 12 Undeveloped - Industrial M1 Industrial 14.75 CFS/AC 0.0075 2.00 0.11 0.22 13 Undeveloped - SFR R3/R4 SFR 1029 GPD/DU 250 2.91 0.40 1.16 14 Undeveloped - Commerical C-C Commerical 134.52 CFS/AC 0.0056 1.80 0.75 1.36 15 Undeveloped - COmmerical C-2 Commerical 40.36 CFS/AC 0.0056 1.80 0.23 0.41 16 Undeveloped - Manafacturing M-2 Industrial 18.05 CFS/AC 0.0075 2.00 0.14 0.27 17 Undeveloped - Manafacturing M-3 Industrial 49.84 CFS/AC 0.0075 2.00 0.37 0.75 18 Undeveloped - Manafacturing M-4 Industrial 79.22 CFS/AC 0.0075 2.00 0.59 1.19 19 Undeveloped - Office C-O Commerical 11.65 CFS/AC 0.0056 1.80 0.07 0.12 3 10 Undeveloped - Mixed Use Zone MX-2 Commerical 20.61 CFS/AC 0.0056 1.80 0.12 0.21 411 Undeveloped SFR R2 SFR 67 GPD/DU 250 3.82 0.03 0.10 4 12-A Partially Developed SFR WM-SP SFR 6350 GPD/DU 250 2.42 2.46 5.95 4 12-B Undeveloped Commerical WM-SP Commerical 67.7 CFS/AC 0.0056 1.80 0.38 0.68 4 13 WM-SP Special Use and Office WM-SP Commerical 209.29 CFS/AC 0.0056 1.80 1.17 2.11 414 Undeveloped SFR R3 SFR 1593 GPD/DU 250 2.78 0.62 1.71 415 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 416 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 417 Undeveloped SFR R2 SFR 226 GPD/DU 250 3.38 0.09 0.30 418 Undeveloped Commerical C-2 Commerical 17.48 CFS/AC 0.0056 1.80 0.10 0.18 419 Undeveloped Commerical C-2 Commerical 26.1 CFS/AC 0.0056 1.80 0.15 0.26 420 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 421 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 422 Undeveloped SFR R2 SFR 118 GPD/DU 250 3.61 0.05 0.16 4 23-A Undeveloped SFR R2 SFR 208 GPD/DU 250 3.41 0.08 0.27 4 23-B Undeveloped Commerical C-2 Commerical 11.25 CFS/AC 0.0056 1.80 0.06 0.11 4 24 Undeveloped SFR R4 SFR 225 GPD/DU 250 3.38 0.09 0.29 425 Undeveloped - Manafacturing M-2 Industrial 17.35 CFS/AC 0.0075 2.00 0.13 0.26 426 Undeveloped - Manafacturing M-2 Industrial 107.25 CFS/AC 0.0075 2.00 0.80 1.61 427 Undeveloped Commerical C-2 Commerical 53.32 CFS/AC 0.0056 1.80 0.30 0.54 428 Undeveloped SFR R1 SFR 7,142 GPD/DU 250 2.39 2.76 6.61 429 Undeveloped SFR R2 SFR 748 GPD/DU 250 3.00 0.29 0.87 430 Undeveloped SFR R1 SFR 600 GPD/DU 250 3.07 0.23 0.71 431 Undeveloped Commerical C-2 Commerical 20.65 CFS/AC 0.0056 1.80 0.12 0.21 432 Undeveloped SFR R1 SFR 598 GPD/DU 250 3.07 0.23 0.71 433 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 434 Undeveloped SFR R1 SFR 5 GPD/DU 250 4.95 0.00 0.01 435 Undeveloped Commerical C-2 Commerical 32.57 CFS/AC 0.0056 1.80 0.18 0.33 436 Undeveloped SFR R1 SFR 672 GPD/DU 250 3.03 0.26 0.79 437 Undeveloped SFR R1 SFR 1 GPD/DU 250 5.81 0.00 0.00 438 Undeveloped SFR R-1 SFR 135 GPD/DU 250 3.56 0.05 0.19 4

Page 11 ends

kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030

ATTACHMENT E
Flow Monitoring Results
Kimley»Horn
1 Flow Monitoring
Standard Data
Report
Prepared for:

Kimley-Horn
Barsin Bet Govargez
[email protected]
657-204-5037
Utility Systems Science and Software, Inc.
601 N. Parkcenter Dr. Suite 209
Santa Ana, CA 92705
Phone 714-542-1004 Fax: 714-542-1332
.i
to/
11 0
2025.08.19-10.16 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
Methods & Procedures & Equipment
Methods and Procedures
Utility Systems Science & Software provided Bakersfield with an off the shelf, non-proprietary flow monitoring solution that included six states of the art Hach Flo-Dar® AV Sensor systems. The project course of action is listed below. The US3 team:
x Assessed permitting and traffic control at the sites on Harvest Creek Rd, Jewetta Ave, Buena Vista Rd, and Mc Cutchen Rd in Bakersfield, CA.
x Prepared the traffic control and assessed the City Encroachment Permit. x Installed and removed traffic control in accord with approved traffic control plans per California Temporary Traffic Control Handbook (CATTCH) requirements for the installation, calibration and removal of equipment.
x Validated the sites for suitability for sewer flow monitoring for the Bakersfield 2025 Project.
o Site 1: Harvest Creek Rd MH pipe entering from northwest with slow to moderate open channel hydraulics with some turbulence due to inflow from lateral.

Measurements were taken on the downstream line to get the total flow. o Site 2: Jewetta Ave MH had no laterals with slow to moderate open channel hydraulics. Measurements were taken on the downstream line as it provided the best hydraulics during inspection.
o Site 3: Buena Vista Rd MH had no laterals with slow to moderate open channel hydraulics. Measurements were taken on the downstream line as it provided the best hydraulics during inspection.
o Site 4: Mc Cutchen Rd MH had no laterals with slow to moderate open channel hydraulics. Measurements were taken on the downstream line as it provided the best hydraulics during inspection.
o Site 5: Lift Station MH 01 had no laterals with slow to moderate open channel hydraulics. Measurements were taken on the upstream line to capture the inflows. o Site 6: Lift Station MH 02 had no laterals with slow to moderate open channel hydraulics. Measurements were taken on the downstream line to capture the outflows.
x Installed and calibrated the flow monitoring equipment at the sites per manufacturer recommendations on 08/19/2025 and 10/01/2025.
o Follow-up on the installations confirmed equipment was reading properly. o Collected 15-minute interval depth and velocity data points over the entire monitoring period.
x Removed the equipment on 09/04/2025 and 10/16/2025 and validated the data.

US
2025.08.19-10.16 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
o All of the equipment went through diagnostic testing before and after the study with less than a 1% deviation between manual and meter level readings and less than a 5% deviation between manual and meter velocity readings. o Equipment calibration was verified in accordance with manufacturer specifications.
x Prepared the data reports.
o The table below contains a summary of the average (Avg) and maximum (Max) velocities (Vel) and levels (Lev) collected during this study as well as the calculated flow rates (Flow).

Site
Pipe
Size
(in)
Avg
Vel
(fps)
Max
Vel
(fps)
Avg
Lev
(in)
Max
Lev
(in)
Avg
Flow
(gpm)
Max Flow
(gpm)
01 36 1.82 3.26 11.88 15.75 1751.54 3110.60
02 42 1.26 1.64 15.27 18.98 1844.95 3076.28
03 40 1.18 1.64 14.58 18.79 1572.48 2910.15
04 48 1.96 3.96 24.99 43.53 5080.19 14933.34
05 60 0.87 1.84 41.59 62.00 5410.85 9856.88
06 60 1.06 1.99 42.94 62.32 6784.52 11987.59
E
Site Report October 1, 2025
Customer Name: Kimley-HornSite Address:~1113 Harvest Creek Rd Bakersfield CA 93312
Site Name: Harvest Creek Rd
MH
Access:

MH north of address, located
on Brimhall Rd and Harvest
Creek Rd intersection
System Type
Sanitary Storm Combined Other
X
Install Date:

October 1, 2025
Install Time:
12:02
Map
Traffic Safety
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 194.53"
MH Coordinates: 35.368917, -119.101227
Device SN: n/a
Avg Measured Level (in) 12.75"
Avg Measured Velocity 2.26FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics with some turbulence due to inflow from lateral.

Traffic Safety
Used arrow board, cones & signs in accord w/site-specific CATTCH requirements.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 240.00"
Monitored Pipe Size (in) 36"
Inner Pipe Size (in) (In/Out) 36"/36"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Lined
Silt (in) 0.00"
Sensor Offset (in) 45.47"
Flow Direction West
Sensor Direction Downstream

Page 1 of 2 ends

‘AEal, m TLA ■ Yitt .. :
—
I
■ (W $8
Fe
r -7
sI 9 l F Fdi GoxonGxcl
i
6 2
L
I (}"a*
i
rue
3 d
।s
)Y,
R. M3
is
ib Inio 9 W
Site Report October 1, 2025
Customer Name: Kimley-HornSite Address:~1113 Harvest Creek Rd Bakersfield CA 93312
Site Name: Harvest Creek Rd
MH
Site Before Install
Sewer Map Installed
Downstream Downstream Pipe Size

Page 2 of 2 ends

386/t
Ce f
ker Dr
Shellabarger Rd
CE -Cheno-CEt-$ 2
CCH
iall Square
Ce Ce w O
Brimhall I H
C
T
CC
E
i
-CRd
I C
M
l i
-
2001
-
■
T
UH
I
38 j
<
Kts 51 5 [-£s
n=
PV 19
e
_________ ____

UTILITY SYSTEMS SCIENCE & SOFTWARE
het
wgyonilertrr
C
4 177
1 1
F
7 $
(
1 Velocity (fps) Level (in) Flow (gpm)
Average 1.853 11.909 1796.993 RainFall Inches
Maximum 2.740 15.120 3059.830
Minimum 1.160 7.690 607.420 10/17/2025

Page 4 of 7 ends

2025.05 Harvest Creek Rd MH
3500
3000
ACC2500
-2000
-1500
-1000
500
0 10/02/ 2025 10/02/ 2025 10/03/ 2025 10/03/ 2025 10/04/ 2025 10/04/ 2025 ----- Velocity ---------- Level ----- Flow
1 US3
o
Level and Velocity
LO
T r
Oo o
T
LO
T
Velocity (fps) Level (in) Flow (gpm)
Average 1.870 11.883 1806.370 RainFall Inches
Maximum 2.800 15.750 3110.600
Minimum 1.130 7.740 595.600 10/17/2025

Page 5 of 7 ends

2025.05 Harvest Creek Rd MH
20 3500
3000
15 W
2500
2000
10 1500
1000
5 500
0 0
10/07/ 2025 10/09/ 2025 10/11/2025
----- Velocity ---------- Level ----- Flow
O S
US3
Level and Velocity
Velocity (fps) Level (in) Flow (gpm)
Average 1.718 11.841 1640.468 RainFall Inches
Maximum 3.260 15.180 2926.870
Minimum 0.770 7.550 384.570 10/17/2025

Page 6 of 7 ends

2025.05 Harvest Creek Rd MH
20 3000
L 2500
15 2000
10 1500
v 5 -
1000
5 500
0 0
10/13/ 2025 10/14/2025 10/15/2025 10/16/ 2025
----- Velocity ---------- Level ----- Flow
O S
US3
Level and Velocity
10/17/2025 10:19:08 AM
10/1/2025 thru 10/16/2025

Page 7 of 7 ends

2025.05 Harvest Creek Rd MH

2.0 3.0
Velocity (fps)
Li

1.0 D

2.5 Li

1.5 -3
o
Level (in)
o o
oL
LO
I
o
I r
Oo LO
T
Utility Systems Science and Software
2025.05 Harvest Creek Rd MH:
10/1/2025 thru 10/16/2025
Report Date: 10/17/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Harvest Creek Rd MH
Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 10/1/25 1919.53 2120.94 1771.13 2.77 3.06 2.55 1.94 2.11 1.82 12.57 12.75 12.44 2,764,122 10/2/25 1775.76 3059.83 653.48 2.56 4.41 0.94 1.86 2.74 1.16 11.79 14.41 7.82 2,557,099 10/3/25 1816.12 2908.76 658.60 2.62 4.19 0.95 1.87 2.60 1.19 11.94 14.50 7.93 2,615,214 10/4/25 1769.74 2969.48 607.42 2.55 4.28 0.88 1.81 2.61 1.16 11.84 15.12 7.69 2,548,421 10/5/25 1815.06 2970.86 679.50 2.62 4.28 0.98 1.86 2.61 1.22 11.87 14.75 7.86 2,613,682 Week: 1819.24 3059.83 607.42 2.62 4.41 0.88 1.87 2.74 1.16 12.00 15.12 7.69 13,098,53 8 10/6/25 1916.95 2982.04 675.87 2.76 4.30 0.97 1.94 2.61 1.18 12.09 14.93 7.96 2,760,407 10/7/25 1746.88 2778.02 656.79 2.52 4.00 0.95 1.84 2.55 1.19 11.74 14.21 7.91 2,515,501 10/8/25 1741.57 2706.59 595.60 2.51 3.90 0.86 1.84 2.45 1.17 11.73 14.05 7.74 2,507,863 10/9/25 1741.20 2832.90 622.90 2.51 4.08 0.90 1.84 2.59 1.18 11.75 13.91 7.89 2,507,329 10/10/25 1885.83 3110.60 693.78 2.72 4.48 1.00 1.95 2.80 1.13 11.88 13.98 7.93 2,715,594 10/11/25 1797.11 2785.48 687.95 2.59 4.01 0.99 1.82 2.51 1.19 12.10 15.75 8.05 2,587,836 10/12/25 1818.15 2870.98 673.29 2.62 4.14 0.97 1.86 2.57 1.18 11.96 15.18 7.86 2,618,136 Week: 1806.81 3110.60 595.60 2.60 4.48 0.86 1.87 2.80 1.13 11.90 15.75 7.74 18,212,66 5

Page 1 of 7 ends

IIS'
MM
Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Date Avg Max Min Avg Max Min Avg Max Min Avg Max Min Total Gal Rain 10/13/25 1827.80 2926.87 745.30 2.63 4.22 1.07 1.86 2.64 1.20 12.09 15.07 8.01 2,632,036 10/14/25 1475.21 2666.89 384.57 2.13 3.84 0.55 1.56 3.26 0.77 11.85 14.26 7.70 2,124,304 10/15/25 1486.43 2441.71 633.63 2.14 3.52 0.91 1.60 2.34 1.16 11.83 14.30 7.78 2,140,454 10/16/25 1581.95 2678.89 573.94 2.28 3.86 0.83 1.72 2.51 1.17 11.38 14.33 7.55 2,278,007 Week: 1592.85 2926.87 384.57 2.30 4.22 0.55 1.68 3.26 0.77 11.79 15.07 7.55 9,174,802 Totals: 1757.21 3110.60 384.57 2.53 4.48 0.55 1.82 3.26 0.77 11.90 15.75 7.55 40,486,00 6

Page 2 of 7 ends

Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~1108 Sayword Ct Bakersfield CA 93312 Site Name: Jewetta Ave MH Access:

MH east of address, located
on Jewetta Ave and Brimhall
Rd intersection
System Type
Sanitary Storm Combined Other
X
Install Date:

August 19, 2025
Install Time:
13:33
Map
Traffic Safety
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 118.62"
MH Coordinates: 35.368621, -119.127927
Device SN: n/a
Avg Measured Level (in) 17.80"
Avg Measured Velocity 1.46FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics
Traffic Safety
Used arrow board, cones & signs in accord w/site-specific CATTCH requirements.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 167.00"
Monitored Pipe Size (in) 42"
Inner Pipe Size (in) (In/Out) 42"/42"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Lined
Silt (in) 0.00"
Sensor Offset (in) 48.38"
Sensor Dist. to Crown (in) 8.38"
Flow Direction South
Sensor Direction Downstream

Page 1 of 2 ends

C. arrn fr
a
■ ‘ 5-
... '
1 19s

UTILITY SYSTEMS SCIENCE & SOFTWARE
II
ran
114.I
.. ■ A
TVSD
P
S Rss
stG
Eopo
—iFd -$
"~C — Jrc
Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~1108 Sayword Ct Bakersfield CA 93312 Site Name: Jewetta Ave MH Site Before Install
Sewer Map Installed
Downstream Downstream Pipe Size

Page 2 of 2 ends

F — “7
P
i
-
I
_ad ‘
■
,* 2 A
-C
N
tor
2 1
r - "e
oo)
f
08/19/2025 13:38:52
-
17)
..

UTILITY SYSTEMS SCIENCE & SOFTWARE 93
3 - U
— , _ . c
)
C . -Jeesoson
• 5 -•
pr ) r' 4
I
f
??
siAtr .

UOPC W23 ’ 2a
4s
A ■ ' 14 ",
Velocity (fps) Level (in) Flow (gpm)
Average 1.252 15.180 1810.849 RainFall InchesMaximum 1.580 18.450 2834.351Minimum 0.830 10.200 705.608 9/11/2025 2025.05 Jewetta Ave MH
3000
-2500
2000
15001000
-500
■
0 8/20/ 2025 8/21/2025 8/22/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
o
T
LO
T r
O
o LO
T
Velocity (fps) Level (in) Flow (gpm)
Average 1.265 15.269 1845.536 RainFall InchesMaximum 1.610 18.980 2917.291Minimum 0.810 10.180 731.360 9/11/2025 2025.05 Jewetta Ave MH
3000
-2500-2000
15001000
-500
■
■
0 8/25/ 2025 8/27/ 2025 8/29/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
o
T
LO
T r
O
o LO
T
Velocity (fps) Level (in) Flow (gpm)
Average 1.272 15.352 1874.368 RainFall InchesMaximum 1.640 18.880 3076.283Minimum 0.790 10.340 685.627 9/11/2025 2025.05 Jewetta Ave MH
3500300025002000
15001000
500
■
T
0 8/31/2025 9/01/2025 9/02/ 2025 9/03/ 2025
----- Velocity ---------- Level ----- Flow
o S
JE2

ID CH OO
Level and Velocity
r
O
o
9/11/2025 12:48:16 AM
8/19/2025 thru 9/4/2025
2025.05 Jewetta Ave MH
T

0.5 1.0 1.5
Velocity (fps)
-3
o
Level (in)
o
o
o
T
ui
N
o
J
LO
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain 8/19/25 2158.72 1577.76 3.11 4.08 2.27 1.35 1.03 16.58 18.45 3,108,5608/20/25 1748.29 869.59 2.52 3.75 1.25 1.24 0.97 14.98 18.24 2,517,5378/21/25 1858.82 774.31 2.68 4.04 1.12 1.28 0.89 15.19 18.24 2,676,7018/22/25 1785.54 853.01 2.57 3.88 1.23 1.24 1.00 15.16 17.83 2,571,1808/23/25 1853.62 705.61 2.67 3.97 1.02 1.24 0.83 15.40 18.34 2,669,2068/24/25 1964.66 768.45 2.83 4.16 1.11 1.30 0.94 15.58 18.98 2,829,117 Week: 1894.94 705.61 2.73 4.16 1.02 1.28 0.83 15.48 18.98 16,372,301 8/25/25 1863.40 813.71 2.69 4.08 1.17 1.26 0.93 15.40 18.29 2,683,3028/26/25 1819.52 731.36 2.62 4.20 1.05 1.26 0.81 15.13 18.45 2,620,1028/27/25 1827.04 765.39 2.63 3.91 1.10 1.27 0.90 15.16 18.16 2,630,9318/28/25 1780.54 835.33 2.57 4.07 1.20 1.25 0.95 15.08 18.17 2,563,9818/29/25 1800.95 857.45 2.60 3.74 1.24 1.26 0.94 15.18 17.86 2,593,362 8/30/25 1825.41 809.03 2.63 3.85 1.17 1.24 0.90 15.28 18.47 2,628,596 Report Date: 09/11/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Jewetta Ave MH Utility Systems Science and Software Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
2834.35 1.55 15.472601.77 1.50 10.202802.24 1.58 10.702689.95 1.54 10.572752.27 1.57 10.552890.51 1.57 10.182890.51 1.58 10.182828.31 1.57 10.792917.29 1.61 10.652710.10 1.52 10.572824.84 1.58 10.432596.75 1.48 10.362673.91 1.51 10.62 Statistics for 2025.05 Jewetta Ave MH: 8/19/2025 thru 9/4/2025

Page 1 of 2 ends

ID-3
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
8/31/25 1907.03 863.49 2.75 3.93 1.24 1.30 1.03 15.32 18.26 2,746,124 Week: 1831.98 731.36 2.64 4.20 1.05 1.26 0.81 15.22 18.47 18,466,397 9/1/25 1937.49 685.63 2.79 4.43 0.99 1.26 0.79 15.64 18.88 2,789,9919/2/25 1899.49 977.75 2.74 4.12 1.41 1.29 0.95 15.43 18.55 2,735,2669/3/25 1823.55 959.96 2.63 4.10 1.38 1.27 1.06 15.25 18.42 2,625,9099/4/25 1419.67 798.39 2.05 4.07 1.15 1.14 0.92 13.37 18.31 2,044,329 Week: 1770.05 685.63 2.55 4.43 0.99 1.24 0.79 14.92 18.88 10,195,495 Totals: 1839.63 685.63 2.65 4.43 0.99 1.26 0.79 15.24 18.98 45,034,194 2729.21 1.53 10.432917.29 1.61 10.363076.28 1.64 10.343076.28 1.64 10.182822.92 1.56 10.733076.28 1.64 10.342859.50 1.56 10.662845.44 1.56 10.59

Page 2 of 2 ends

Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~11307 Westerham Ct Bakersfield CA 93311 Site Name: Buena Vista Rd MH Access:

MH southeast of address, located
on Buena Vista Rd and
White Ln intersection
System Type
Sanitary Storm Combined Other
X
Install Date:

August 19, 2025
Install Time:
11:52
Map
Traffic Safety
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 174.99"
MH Coordinates: 35.325354, -119.12799
Device SN: n/a
Avg Measured Level (in) 17.75"
Avg Measured Velocity 1.39FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics
Traffic Safety
Used cones to delineate the flow of traffic.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 219.00"
Monitored Pipe Size (in) 40"
Inner Pipe Size (in) (In/Out) 40"/40"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Lined
Silt (in) 0.00"
Sensor Offset (in) 44.01"
Sensor Dist. to Crown (in) 4.01"
Flow Direction South
Sensor Direction Downstream

Page 1 of 2 ends

—
r. A.
mi ist
d herea
d
18"- + -
rjun Xs-9
a"
50 o
5 ■
“ A
ji 11 i
I JI"
"92 3 =
y : /
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
- »!»
21219** *
kt !J< > !
Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~11307 Westerham Ct Bakersfield CA 93311 Site Name: Buena Vista Rd MH Site Before Install
Sewer Map Installed
Downstream Downstream Pipe Size

Page 2 of 2 ends

PraOh
4 t
..4. J 2tt n5 Y
i
I
11 J ..I
i
d 13"
“see 1
V
Mi whhe.
2 U
1—D ©-oF
—o
0 White Ln
$ o
.365f l
'i -Ce-366 ft
C-I
.0 7
T Wit .9 4.
t
4 y
7 g"
3 E A
“ 1
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
Stockdale High
School
A4
-
: s r
' J sr , 7 44.4n4, "‘A ■ 2.

AYz= 1
. ...
y
4 *1W- . ■
Velocity (fps) Level (in) Flow (gpm)
Average 1.166 14.509 1537.575 RainFall InchesMaximum 1.630 18.440 2544.440Minimum 0.730 10.040 596.890 9/22/2025 2025.05 Buena Vista Rd MH
3000
MMMAMA
p \ / 1
/// W
-2500
P
-2000
1500
v
1000
-500
■
■
0 8/20/ 2025 8/21/2025 8/22/ 2025 8/23/ 2025
----- Velocity ---------- Level ----- Flow
o S

ID CH OO
Level and Velocity
O
o
Velocity (fps) Level (in) Flow (gpm)
Average 1.188 14.706 1610.314 RainFall InchesMaximum 1.640 18.790 2910.150Minimum 0.670 10.200 572.640 9/22/2025 2025.05 Buena Vista Rd MH
20 3000
-2500
15-
-2000
10 1500
1000
5 -500
0 ■
0 8/26/ 2025 8/28/ 2025 8/30/ 2025
----- Velocity ---------- Level ----- Flow
o S
Level and Velocity
Velocity (fps) Level (in) Flow (gpm)
Average 1.169 14.467 1547.859 RainFall InchesMaximum 1.520 17.970 2437.180Minimum 0.705 10.310 585.320 9/22/2025 2025.05 Buena Vista Rd MH
2500
-2000
1500
W b
II W 1000
-500
■
0 9/01/2025 9/02/ 2025 9/03/ 2025 9/04/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
o
T
LO
T r
O
o LO
T
9/22/2025 11:33:49 AM
8/19/2025 thru 9/4/2025
2025.05 Buena Vista Rd MH
. * -

0.5 1.0 1.5
Velocity (fps)
us;
o
Level (in)
o
o
o
T
Ul
N
o
J
LO
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain 8/19/25 1669.45 1265.89 2.41 3.29 1.82 1.23 0.98 15.18 17.88 2,404,0058/20/25 1436.51 596.89 2.07 3.30 0.86 1.11 0.73 14.30 17.86 2,068,5728/21/25 1477.82 699.89 2.13 3.37 1.01 1.15 0.84 14.35 17.98 2,128,0578/22/25 1575.61 716.16 2.27 3.33 1.03 1.19 0.77 14.52 18.44 2,268,8778/23/25 1597.18 665.49 2.30 3.67 0.96 1.20 0.78 14.54 18.08 2,299,9358/24/25 1670.88 572.64 2.41 4.19 0.83 1.20 0.68 14.80 18.49 2,406,062 Week: 1571.24 572.64 2.26 4.19 0.83 1.18 0.68 14.62 18.49 13,575,509 8/25/25 1524.42 650.41 2.20 3.37 0.94 1.14 0.67 14.68 17.99 2,195,1588/26/25 1557.05 749.85 2.24 3.96 1.08 1.19 0.84 14.42 18.79 2,242,1458/27/25 1617.97 657.40 2.33 3.49 0.95 1.21 0.74 14.62 18.41 2,329,8708/28/25 1662.94 659.02 2.40 3.54 0.95 1.21 0.80 14.84 18.72 2,394,6348/29/25 1589.84 627.30 2.29 3.52 0.90 1.15 0.74 14.89 17.72 2,289,370 8/30/25 1649.12 648.93 2.38 3.60 0.94 1.22 0.71 14.68 18.09 2,374,726 Report Date: 09/11/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Buena Vista Rd MH Utility Systems Science and Software Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
2280.36 1.49 13.742287.81 1.41 10.472337.70 1.56 10.382311.16 1.54 10.572544.44 1.63 10.042910.15 1.64 10.202910.15 1.64 10.042337.19 1.56 10.682749.78 1.64 10.442424.68 1.56 10.322457.63 1.49 10.372445.05 1.48 10.382494.94 1.51 10.23 Statistics for 2025.05 Buena Vista Rd MH: 8/19/2025 thru 9/4/2025

Page 1 of 2 ends

ID-3
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
8/31/25 1576.55 585.32 2.27 3.33 0.84 1.16 0.70 14.63 17.97 2,270,237 Week: 1596.84 585.32 2.30 3.96 0.84 1.18 0.67 14.68 18.79 16,096,140 9/1/25 1501.12 700.32 2.16 3.25 1.01 1.14 0.75 14.52 17.09 2,161,6089/2/25 1566.33 745.16 2.26 3.51 1.07 1.19 0.82 14.47 17.24 2,255,5119/3/25 1607.57 726.61 2.32 3.28 1.05 1.20 0.82 14.58 17.30 2,314,9039/4/25 1399.84 642.98 2.02 3.33 0.93 1.13 0.79 13.66 17.35 2,015,764 Week: 1518.71 642.98 2.19 3.51 0.93 1.16 0.75 14.31 17.35 8,747,785 Totals: 1569.42 572.64 2.26 4.19 0.83 1.18 0.67 14.57 18.79 38,419,434 2312.99 1.43 10.352749.78 1.64 10.232256.02 1.46 10.532910.15 1.64 10.042314.39 1.50 10.372437.18 1.52 10.312437.18 1.52 10.512274.43 1.49 10.31

Page 2 of 2 ends

Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~7829 Gosford Rd Bakersfield CA 93313 Site Name: Mc Cutchen Rd MH Access:

MH north of address, in
dirt area of Mc Cutchen
Rd
System Type
Sanitary Storm Combined Other
X
Install Date:

August 19, 2025
Install Time:
10:42
Map
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 302.38"
MH Coordinates: 35.281771, -119.092637
Device SN: n/a
Avg Measured Level (in) 34.90"
Avg Measured Velocity 0.82FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics
Traffic Safety
Used arrow board, cones & signs in accord w/site-specific CATTCH requirements.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 357.00"
Monitored Pipe Size (in) 48"
Inner Pipe Size (in) (In/Out) 48"/48"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Lined
Silt (in) 0.00"
Sensor Offset (in) 54.62"
Flow Direction East
Sensor Direction Downstream

Page 1 of 2 ends

in 1 il • 3 '
' . A
-(
6'
| €
lil ^4 . "a W
. 2e=a
- &
— la
I
-
.) wo.egh .

UTILITY SYSTEMS SCIENCE & SOFTWARE 93
1 I I I
s
Site Report August 19, 2025
Customer Name: Kimley-Horn Site Address:~7829 Gosford Rd Bakersfield CA 93313 Site Name: Mc Cutchen Rd MH Site Before Install
Sewer Map Installed
Downstream Downstream Pipe Size

Page 2 of 2 ends

,wd . 5
f 3‘ )
l
E
1 H
t,. i +
H
97 z
r a
-
ed.

S
* w”
mi ■
---% UN
atd 40)
awls
. r ' jgs.
2 Mc Cutchen Rd
27 % ’
V
F4
:e . A
. A i ..
85 3
08/19/2025 11:00:51
, ■
7A‘
“yos A2
—
It L
V
)
1 '
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
Velocity (fps) Level (in) Flow (gpm)
Average 1.907 28.487 4948.074 RainFall InchesMaximum 3.960 43.530 14933.340Minimum 0.570 13.470 2464.910 9/11/2025 2025.05 Me Cutchen Rd MH
16000
-14000-12000
10000
80006000 (V
-4000-2000
■
■
0 8/20/ 2025 8/21/2025 8/22/ 2025 8/23/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
r
LO
o
CO
O
T
O
o
T
O
T
o
I
Velocity (fps) Level (in) Flow (gpm)
Average 2.277 20.243 5050.034 RainFall InchesMaximum 3.890 28.270 6956.780Minimum 1.450 13.680 2403.670 9/11/2025 2025.05 Me Cutchen Rd MH
8000
A
H MJ V
-6000
4000
-2000
■
■
0 8/25/ 2025 8/27/ 2025 8/29/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
o
1 LO
I r
co
o
CXI
o
T I
CXI
LO on
Velocity (fps) Level (in) Flow (gpm)
Average 1.529 28.991 5247.299 RainFall InchesMaximum 2.380 39.110 7378.320Minimum 0.920 20.310 3241.450 9/11/2025 2025.05 Me Cutchen Rd MH
8000
-6000
4000
2000
■
■
0 8/31/2025 9/01/2025 9/02/ 2025 9/03/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
C
o
T
o
T
o
J
GO
O
9/11/2025 1:01:10 AM
8/19/2025 thru 9/4/2025
2025.05 Me Cutchen Rd MH
-
o 2.0 3.0
Velocity (fps)
1—

1.0 us;
o
ooo
Level (in)
co
o
O
o
LO
o
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain 8/19/25 5017.65 3601.24 7.23 8.59 5.19 1.06 0.82 37.53 39.45 7,225,4228/20/25 4748.53 2896.33 6.84 8.83 4.17 0.94 0.60 40.47 42.92 6,837,8898/21/25 5451.97 3026.66 7.86 21.52 4.36 2.07 0.57 30.43 43.53 7,850,8318/22/25 5286.39 3298.31 7.62 9.98 4.75 3.06 2.40 17.30 27.90 7,612,4048/23/25 4564.03 2464.91 6.58 10.02 3.55 2.16 1.47 18.92 21.85 6,572,1998/24/25 4819.81 2403.67 6.94 10.00 3.46 2.14 1.55 19.87 24.15 6,940,521 Week: 4981.40 2403.67 7.18 21.52 3.46 1.90 0.57 27.42 43.53 43,039,267 8/25/25 5186.66 3304.61 7.47 9.76 4.76 2.14 1.75 21.21 24.65 7,468,7878/26/25 5007.37 2849.77 7.22 9.44 4.11 2.08 1.61 21.02 24.74 7,210,6178/27/25 5050.30 2535.69 7.28 9.57 3.65 1.95 1.45 22.34 26.99 7,272,4338/28/25 5254.75 3786.03 7.57 9.74 5.46 2.61 1.59 19.86 28.27 7,566,8428/29/25 5070.41 3507.22 7.31 9.50 5.05 2.88 2.14 16.92 20.77 7,301,384 8/30/25 5122.34 3570.52 7.38 9.69 5.14 2.10 1.77 21.24 24.67 7,376,175 Report Date: 09/11/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Mc Cutchen Rd MH Utility Systems Science and Software Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
5963.86 1.20 34.856125.71 1.22 37.56
14933.34 3.96 15.04
6926.40 3.95 13.476956.78 2.91 15.156936.80 2.54 14.72
14933.34 3.96 13.47
6773.50 2.42 17.676552.52 2.24 16.476642.43 2.26 16.456762.61 3.89 13.886594.23 3.89 13.686726.38 2.44 18.27 Statistics for 2025.05 Mc Cutchen Rd MH: 8/19/2025 thru 9/4/2025

Page 1 of 2 ends

ID-3
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
8/31/25 5176.59 3558.37 7.46 9.46 5.13 1.85 1.54 23.68 26.60 7,454,284 Week: 5124.06 2535.69 7.38 9.76 3.65 2.23 1.45 20.90 28.27 51,650,523 9/1/25 5392.76 3241.45 7.77 10.63 4.67 1.69 1.38 26.21 31.32 7,765,5799/2/25 5156.85 3653.72 7.43 10.07 5.26 1.36 1.15 30.51 35.23 7,425,8689/3/25 4847.65 3673.59 6.99 8.77 5.29 1.12 0.97 34.24 38.41 6,980,6189/4/25 5388.59 3848.85 7.76 8.83 5.55 1.14 0.92 37.44 39.11 7,759,574 Week: 5196.47 3241.45 7.49 10.63 4.67 1.33 0.92 32.10 39.11 29,931,639 Totals: 5090.74 2403.67 7.34 21.52 3.46 1.90 0.57 25.84 43.53 ######### 6567.35 2.20 20.316773.50 3.89 13.687378.32 1.97 20.81
14933.34 3.96 13.47
6127.90 1.25 33.357378.32 1.97 20.816985.39 1.79 26.086084.82 1.38 30.41

Page 2 of 2 ends

Site Report August 20, 2025
Customer Name: Kimley-Horn Site Address:~7911 Avocado Ln Bakersfield CA 93313 Site Name: Lift Station MH 01 Access:

MH south of address, located
at entrance of lift station
on Mc Cutchen Rd
System Type
Sanitary Storm Combined Other
X
Install Date:

August 20, 2025
Install Time:
09:57
Map
Traffic Safety
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 329.76"
MH Coordinates: 35.281528, -119.09055
Device SN: n/a
Avg Measured Level (in) 58.50"
Avg Measured Velocity 0.91FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics; monitored the upstream line to capture the inflows.

Traffic Safety
Used arrow board, cones & signs in accord w/site-specific CATTCH requirements.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 400.00"
Monitored Pipe Size (in) 60"
Inner Pipe Size (in) (In/Out) 60"/60"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Concrete (cast in place)
Silt (in) 0.00"
Sensor Offset (in) 70.24"
Sensor Dist. to Crown (in) 10.24"
Flow Direction Southwest
Sensor Direction Upstream

Page 1 of 2 ends

IL
Th s " I =
|
sanesibDes • um
a
ja34.

I
t
-
5 -
%
r I
15,

UTILITY SYSTEMS SCIENCE & SOFTWARE
Site Report August 20, 2025
Customer Name: Kimley-Horn Site Address:~7911 Avocado Ln Bakersfield CA 93313 Site Name: Lift Station MH 01 Site Before Install
Sewer Map Installed
Upstream Upstream Pipe Size

Page 2 of 2 ends

The ■
1 I
-
nee ■ l
indl
T -
rS, . — ' h
wins e
—
_isseesitnin J
o O
3 O t -6 &-
i
)
Ox & coe r
0-
6 Mc Cutchen Rd
%
3S3ft 352ft
□
i
t
)‘ 2
f
1 V
J
2 ft“A
ji
..F
P i
Na %&
1 ‘d
2025 10:28:15
—
ses
T9' 7 —N. i
• /Jt
V
!
r
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
-(
■ ta ■ 4. :

Velocity (fps) Level (in) Flow (gpm)
Average 1.036 42.184 6336.287 RainFall InchesMaximum 1.840 62.000 9856.880Minimum 0.460 23.820 3350.080 9/11/2025 2025.05 Lift Station MH 01
80 10000 A -8000
60 —
6000
40 4000
20 -2000
0 T
T
T
T
T
0 8/21/2025 8/21/2025 8/22/ 2025 8/22/ 2025 8/23/ 2025 8/23/ 2025 ----- Velocity ---------- Level ----- Flow
o S
Level and Velocity
Velocity (fps) Level (in) Flow (gpm)
Average 0.924 38.145 5351.151 RainFall InchesMaximum 1.840 46.810 8864.760Minimum 0.440 21.090 3088.020 9/11/2025 2025.05 Lift Station MH 01
50 10000
40 — -8000
VWVtV
30 6000
20 4000
10— -2000 0 ■ —0
8/26/ 2025 8/28/ 2025 8/30/ 2025
----- Velocity ---------- Level ----- Flow
o S
Level and Velocity
Velocity (fps) Level (in) Flow (gpm)
Average 0.676 46.506 4845.215 RainFall InchesMaximum 1.445 57.660 8035.080Minimum 0.220 30.585 1641.580 9/11/2025 2025.05 Lift Station MH 01
60 10000
-8000
—
40 Amjvt
6000
V 4000
20 -2000
0 f
*
0 9/01/2025 9/02/ 2025 9/03/ 2025 9/04/ 2025
----- Velocity ---------- Level ----- Flow
o S
Level and Velocity
9/11/2025 1:11:54 AM
8/20/2025 thru 9/4/2025
2025.05 Lift Station MH 01
- -

0.5 1.0
Velocity (fps)
1—

1.5 us;
o
Level (in)
o
o
o
Tr
co
o
CD
o
T
O
o
1 Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain 8/20/25 7624.64 7272.46 10.99 12.01 10.48 0.87 0.83 59.39 60.36 10,979,4778/21/25 7406.90 3350.08 10.67 14.20 4.83 0.97 0.46 54.28 62.00 10,665,9328/22/25 5646.10 3428.99 8.14 10.87 4.94 1.16 0.75 32.37 35.34 8,130,3808/23/25 5687.46 4003.48 8.20 10.13 5.77 1.02 0.77 36.32 38.68 8,189,9448/24/25 5650.77 3914.33 8.14 10.62 5.64 0.96 0.75 37.73 40.19 8,137,105 Week: 6403.17 3350.08 9.23 14.20 4.83 0.99 0.46 44.02 62.00 46,102,838 8/25/25 5881.47 4245.75 8.47 10.45 6.12 0.95 0.73 39.63 42.51 8,469,3148/26/25 5354.14 4261.25 7.71 9.04 6.14 0.87 0.76 39.47 42.98 7,709,9588/27/25 5253.15 4487.37 7.57 8.96 6.47 0.85 0.69 39.77 43.51 7,564,5398/28/25 4562.56 3088.02 6.57 12.77 4.45 0.84 0.44 39.20 46.81 6,570,0938/29/25 5440.82 3190.08 7.84 10.89 4.60 1.10 0.64 32.84 36.77 7,834,7858/30/25 5315.15 3843.78 7.66 9.40 5.54 0.89 0.68 38.37 41.44 7,653,811 8/31/25 4865.90 3463.66 7.01 9.15 4.99 0.75 0.57 41.45 43.96 7,006,903 Report Date: 09/11/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Lift Station MH 01 Utility Systems Science and Software Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
8333.55 0.95 58.479856.88 1.84 23.827542.68 1.50 28.047032.34 1.23 34.207369.45 1.19 33.379856.88 1.84 23.827249.52 1.11 36.076276.36 0.96 34.626215.32 0.94 35.008864.76 1.84 21.097558.07 1.60 25.746522.73 1.13 36.796347.28 0.95 38.80 Statistics for 2025.05 Lift Station MH 01: 8/20/2025 thru 9/4/2025

Page 1 of 2 ends

ID-3
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
Week: 5239.03 3088.02 7.55 12.77 4.45 0.89 0.44 38.68 46.81 52,809,402 9/1/25 4258.79 3245.59 6.14 7.69 4.68 0.62 0.51 43.42 46.87 6,132,6639/2/25 3590.46 1641.58 5.17 7.03 2.37 0.47 0.22 47.97 50.46 5,170,2679/3/25 5472.84 1848.69 7.89 11.58 2.66 0.78 0.23 48.17 54.82 7,880,8839/4/25 7182.25 3408.58 10.35 11.36 4.91 0.84 0.40 56.33 57.66 10,342,440 Week: 5126.09 1641.58 7.39 11.58 2.37 0.68 0.22 48.97 57.66 29,526,253 Totals: 5574.59 1641.58 8.03 14.20 2.37 0.87 0.22 42.92 62.00 ######### 4878.20 0.63 44.688864.76 1.84 21.098035.08 1.45 30.589856.88 1.84 21.098035.08 1.45 30.587882.82 0.91 54.895337.27 0.77 39.34

Page 2 of 2 ends

Site Report August 20, 2025
Customer Name: Kimley-Horn Site Address:~7911 Avocado Ln Bakersfield CA 93313 Site Name: Lift Station MH 02 Access:

MH south of address, located
at entrance of lift station
on Mc Cutchen Rd
System Type
Sanitary Storm Combined Other
X
Install Date:

August 20, 2025
Install Time:
09:59
Map
Traffic Safety
Gas
O2 H2S CO LEL

20.9% 0ppm 0ppm 0%
Device Statistics
Meter Depth (in): 330.58"
MH Coordinates: 35.281528, -119.09055
Device SN: n/a
Avg Measured Level (in) 59.00"
Avg Measured Velocity 1.02FPS
Multiplier 1.00
Notes
Slow to moderate open channel hydraulics; monitored the downstream line to capture the outflows.

Traffic Safety
Used arrow board, cones & signs in accord w/site-specific CATTCH requirements.

Land Use
Residential Commercial Industrial Trunk
X
Field Conditions Sunshine
Manhole Depth (in) 400.00"
Monitored Pipe Size (in) 60"
Inner Pipe Size (in) (In/Out) 60"/60"
Pipe Shape Round
Pipe Condition Fair
Manhole Material Concrete (cast in place)
Silt (in) 0.00"
Sensor Offset (in) 69.42"
Sensor Dist. to Crown (in) 9.42"
Flow Direction Southwest
Sensor Direction Downstream

Page 1 of 2 ends

IL
Th r । =
|
. 1
X.%..
-1
ja34.

I
Ar i c -
%
r i
5 -
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
,3-3r
Site Report August 20, 2025
Customer Name: Kimley-Horn Site Address:~7911 Avocado Ln Bakersfield CA 93313 Site Name: Lift Station MH 02 Site Before Install
Sewer Map Installed
Downstream Downstream Pipe Size

Page 2 of 2 ends

■
•)
—
il
F LaN. e-a.
-
CT
i__ 08 o
o ©
y
)
O -6 O
It
« O 0-
O 6
Mc Cutchen Rd
%
353 352ft
□
its.
-pe
f
O
-
■
oh
(
FOMD)
7/ 1
Bu. dns
ivhe
UTILITY SYSTEMS SCIENCE & SOFTWARE 93
20d.

Velocity (fps) Level (in) Flow (gpm)
Average 1.140 43.484 6941.452 RainFall InchesMaximum 1.990 62.320 11987.590Minimum 0.500 29.390 4388.420 9/12/2025 2025.05 Lift Station MH 02
80 12000
-10000
60—
8000
40 6000
4000
20 -2000
0 T
T
T
T
0 8/21/2025 8/21/2025 8/22/ 2025 8/22/ 2025 8/23/ 2025 8/23/ 2025 ----- Velocity ---------- Level ----- Flow
o S
Level and Velocity
Velocity (fps) Level (in) Flow (gpm)
Average 1.134 39.428 6881.649 RainFall InchesMaximum 1.890 50.720 9349.330Minimum 0.750 29.150 4481.720 9/12/2025 2025.05 Lift Station MH 02
10000
-8000
6000
4000
-2000
■
■
0 8/26/ 2025 8/28/ 2025 8/30/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
C
o
T r
co
o o
Velocity (fps) Level (in) Flow (gpm)
Average 0.878 47.854 6529.220 RainFall InchesMaximum 1.310 58.050 11408.660Minimum 0.580 39.140 4224.870 9/12/2025 2025.05 Lift Station MH 02
12000
An
10000
80006000
4000
2000
■
0 9/01/2025 9/02/ 2025 9/03/ 2025 9/04/ 2025
----- Velocity ---------- Level ----- Flow
o S
O
Level and Velocity
r
co
o
C
o
1 o
T
9/12/2025 11:05:02 AM
8/20/2025 thru 9/4/2025
2025.05 Lift Station MH 02
■
-

0.5 1.0 2.0
Velocity (fps)
1—

1.5 us;
o
Level (in)
o
o
o
T r
co
o
CD
o
T
O
o
1 Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain 8/20/25 7427.31 4388.42 10.70 13.18 6.32 0.84 0.50 59.79 60.71 10,695,3298/21/25 6750.81 4670.77 9.73 17.27 6.73 0.83 0.53 57.42 62.32 9,721,1608/22/25 7189.81 5130.81 10.36 12.79 7.39 1.46 1.04 32.99 46.17 10,353,3278/23/25 6782.52 4625.17 9.77 12.10 6.66 1.20 0.88 36.64 38.99 9,766,8268/24/25 6851.95 4481.72 9.87 12.99 6.46 1.15 0.87 38.06 40.40 9,866,805 Week: 7000.48 4388.42 10.09 17.27 6.32 1.10 0.50 44.98 62.32 50,403,447 8/25/25 7408.07 5094.15 10.67 13.47 7.34 1.18 0.88 39.98 42.97 10,667,6278/26/25 6845.48 4958.36 9.86 11.99 7.14 1.10 0.93 39.81 43.39 9,857,4908/27/25 6719.61 5268.08 9.68 11.84 7.59 1.07 0.93 40.10 43.88 9,676,2338/28/25 6747.30 5048.32 9.72 12.20 7.27 0.99 0.75 44.36 50.70 9,716,1118/29/25 7091.64 5055.61 10.22 12.34 7.28 1.37 0.90 34.99 50.72 10,211,9628/30/25 6507.50 4649.27 9.38 11.40 6.70 1.08 0.81 38.70 41.71 9,370,798 8/31/25 6465.48 4383.98 9.32 12.05 6.32 0.98 0.72 41.78 44.33 9,310,292 Report Date: 09/12/2025
Customer: Kimley-Horn
Group: Bakersfield 2025
Site: 2025.05 Lift Station MH 02 Utility Systems Science and Software Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
9146.99 1.04 58.92
11987.59 1.72 33.95
8873.65 1.99 29.398396.39 1.51 34.569013.09 1.43 33.68
11987.59 1.99 29.39
9349.33 1.42 36.408317.92 1.23 34.978213.68 1.20 35.328465.99 1.44 37.848562.25 1.89 29.157912.62 1.32 37.118360.15 1.25 39.14 Statistics for 2025.05 Lift Station MH 02: 8/20/2025 thru 9/4/2025

Page 1 of 2 ends

ID-3
Date Avg Min Avg Max Min Avg Min Avg Max Total Gal Rain Flow (GPM) Flow (MGD) Velocity (FPS) Level (inches)
Max Max Min
Week: 6826.44 4383.98 9.84 13.47 6.32 1.11 0.72 39.96 50.72 68,810,511 9/1/25 6429.59 4224.87 9.26 11.38 6.09 0.93 0.68 43.77 47.28 9,258,6159/2/25 6799.67 4872.60 9.80 12.30 7.02 0.89 0.68 48.34 50.80 9,791,5189/3/25 6068.57 4676.38 8.74 13.30 6.74 0.74 0.60 52.20 55.23 8,738,7369/4/25 7085.67 4702.57 10.21 16.44 6.78 0.82 0.58 56.24 58.05 10,203,358 Week: 6595.87 4224.87 9.50 16.44 6.09 0.85 0.58 50.14 58.05 37,992,227 Totals: 6823.19 4224.87 9.83 17.27 6.09 1.04 0.50 44.07 62.32 ######### 8535.31 1.09 45.039349.33 1.89 29.15
11408.66 1.31 39.7011987.59 1.99 29.15
9233.45 1.18 49.41
11408.66 1.31 51.95
7896.07 1.11 39.70

Page 2 of 2 ends

2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
Equipment
Figure above: Equipment installed for the Sewer Flow Monitoring Study Figure above: Web-Enabled Flo-Dar® AV Sensor, Radar-Based Velocity/Area Flow Meter 1 Radar Velocity
e
(
—
1, I
1 I-GD
4 10
_______
Surcharge
Velocity
Ultrasonic
Depth
2 otl
6y.”
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
FloDar® AV Sensor Specifications:
x Enclosure
o IP68 Waterproof rating, Polystyrene
x Dimensions
o 160.5 W x 432.2 L x 297 D mm (6.32 x 16.66 x 11.7 in.), o With SVS, D = 387 mm (15.2 in.)
x Weight
o 4.8 kg (10.5 lbs.)
x Operating Temperature
o -10 to 50°C (14 to 122°F)
x Storage Temperature
o -40 to 60°C (-40 to 140°F)
x Power Requirements
o Supplied by FL900 Flow Logger, Flo-Logger, or Flo-Station x Interconnecting Cable
o Disconnect available at both sensor and logger or Flo-Station o Polyurethane, 0.400 (±0.015) in. diameter; IP68
o Standard length 9 m (30 ft), maximum 305 m (1000 ft)
x Cables – available in two styles:
o connectors at both ends
o connector from sensor with open leads to desiccant hub, desiccant hub with connector to logger. A potting/sealant kit will be included. This can be used to run the cable through conduit.
x Certification
o Certified to: FCC Part 15.245: FCC ID: VIC-FLODAR24
o Industry Canada Spec. RSS210. v7: IC No.: 6149A-FLODAR24

SURCHARGE DEPTH MEASUREMENT
o Auto zero function maintains zero error below 0.5 cm (0.2 in.) x Method
o Piezo-resistive pressure transducer with stainless steel diaphragm x Range
o 3.5 m (138 in.), overpressure rating 2.5 x full scale

VELOCITY MEASUREMENT
x Method
o Radar
x Range
o 0.23 to 6.10 m/s (0.75 to 20 ft/s)
1-3,
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
x Frequency Range
o 24.075 to 24.175 GHz, 15.2 mW (max.)
x Accuracy
o ±0.5%; ±0.03 m/s (±0.1 ft/s)

DEPTH MEASUREMENT
x Method
o Ultrasonic
x Standard Operating Range from Flo-Dar® Housing to Liquid o 0 to 152.4 cm (0 to 60 in.)
x Optional Extended Level Operating Range from Transducer Face to Liquid o 0 to 6.1 m (0 to 20 ft.) with 43.18 cm (17 in.) dead band, temperature compensated. x Accuracy
o ±1%; ±0.25 cm (±0.1 in.)

FLOW MEASUREMENT
x Method
o Based on Continuity Equation
x Accuracy
o ±5% of reading typical where flow is in a channel with uniform flow conditions and is not surcharged, ±1% full scale max.

SURCHARGE CONDITIONS DEPTH/VELOCITY DEPTH (Std with Flo-Dar® Sensor) x Surcharge depth supplied by Flo-Dar® sensor.

VELOCITY (Optional Surcharge Velocity Sensor)
x Method
o Electromagnetic
x Range
o ±4.8 m/s (±16 ft/s)
x Accuracy
o ±0.15 ft/s or 4% of reading, whichever is greater.
x Zero Stability
o ±0.05 ft/s
The Flo-Dar® Open Channel Flow Meters provide an innovative approach to open channel flow monitoring. Combining digital Doppler radar velocity sensing with ultrasonic pulse echo level sensing Flo-Dar® provides accurate open channel flow monitoring without the fouling problems associated with submerged sensors.
1-3,
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
Perfect Solution for Difficult Flow Conditions:
x Flows with High Solids Content
x High Temperature Flows
x Caustic Flows
x Large Man-Made Channel
x High Velocities
x Shallow Flows
Benefits:

1. Personnel have no contact with the flow during installation.

2. Maintenance caused by sensor fouling is eliminated.

3. Field Replaceable/Interchangeable Sensors and Monitors FLO D.A IFJ
I
3 -
US
Velocity
Footprint
Level
Footprint ' 7
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
How It Works
Flo-Dar® transmits a digital Doppler radar beam that interacts with the fluid and reflects back signals at a different frequency than that which was transmitted. These reflected signals are compared with the transmitted frequency. The resulting frequency shift provides an accurate measure of the velocity and the direction of the flow. Level is detected by ultrasonic pulse echo. Flow is then calculated based on the Continuity Equation:

Q = V x A, Where Q = Flow, V = Average Velocity and A = Area Accurate Flow Measurements
Flo-Dar® provides the user with highly accurate flow measurements under a wide range of flows and site conditions. By measuring the velocity of the fluid from above, Flo-Dar® eliminates accuracy problems inherent with submerged sensors including sensor disturbances, high solids content and distribution of reflectors.

Figure above: US3 utilizes exclusively Hach March-McBirney Flo-Dar® Meters I
V
4 33
-
1 Sr
J‘7..
-5
er
$
2 J
a -
1-3,
d’l
• f *
Ye
J .
we s-r 2" /
! F Ss
. -
wyt'
Puyyrd
...
t f.
—rreee e)kr
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
US3 Company Information
US3 is a California Corporation Federal ID No. 33-0729605 and qualifies as a Minority Business Enterprise. US3 has certified as an MBE with the California Public Utility Commission’s authorized clearinghouse, Verification Number: 97ES0008.

US3 is a specialty service company for the Water & Waste Water industry, providing monitoring and control for Utilities since 1996. US3 is in the forefront of this industry by taking the proven technological approaches developed in other high-tech industries and applying them to protect one of our most precious natural resources - our water.

US3 engineers and technical personnel have applied advanced instrumentation system technology to water/wastewater open channel flow monitoring, pipeline evaluation, engineering, and data analysis, all coupled to the power of the Internet. This unique integrated systems approach allows the company to bring greater insight and intelligence to gathering information about water/wastewater system performance of our clients, and in turn, to support the fulfillment of their commitments to manage and cost effectively design, operate, and maintain these systems.

Moreover, US3 supports Municipalities, Consulting Engineering firms and other water/waste water systems integrators by providing temporary technical services for engineering, software programming and technical site maintenance and calibration site support work, primarily in the Water and Waste Water industries.

Figure at right: All US3
technicians are certified
for Confined Space Entry.

I'
st
-3,
I
D
• W
o.

P A.. ■
y
2025.08.19-09.04 Temporary Wastewater Flow Monitoring Kimley-Horn Utility Systems Science & Software
Key Personnel Assigned
US3 provided the necessary resources to fully implement this project. Primary in support of this effort were the following personnel:

Mr. Mark Serres: Mr. Serres is a degreed electrical engineer with over 30 years of experience with fresh/wastewater systems, project management, and systems integration in relation to complex industrial systems. This includes experience in industrial automation and water/wastewater industries. Mr. Serres is responsible for assuring client satisfaction and marshalling the required resources to meet the project requirements.

Mr. Thomas Williams: Mr. Williams is an Engineering Manager with over 25 years of experience in complex systems development for wastewater monitoring. This experience includes hydraulic compatibility, instrumentation, communications and analysis. Mr. Williams is responsible for assuring that the required equipment is designed and calibrated to meet the project requirements.

Darlene Szczublewski, PE: Mrs. Szczublewski is a licensed Civil Engineer in multiple states. She has over 20 years of engineering experience with stormwater/wastewater related projects. She assisted in the completion of several Sanitary Sewer Evaluation Surveys and Capacity Analysis projects to meet Consent Decrees as well as completing numerous Infiltration and Inflow (I&I) studies for other clients. Mrs. Szczublewski has developed numerous flow data analysis techniques to present a clear informative picture of flow in a monitored system. Her work also includes the development of training programs for clients describing I&I and capacity analysis methodologies. Mrs. Szczublewski is responsible for analyzing the data as well as the data collection process and assuring that the reports meet the project requirements.

Name, title, address and telephone number of persons to contact regarding this US3 project.

Darlene Szczublewski, PE
Senior Civil Engineer
[email protected]
1300 Hill Street
El Cajon, CA 92020
619-546-4281 (work)
619-246-5304 (cell)
Tom Williams
Engineering Manager
[email protected]
1300 Hill Street
El Cajon, CA 92020
619-546-4281 (work)
619-398-7799 (cell)
1-3,
Appendix J
Urban Decay Analysis Technical Memorandum

Kl^ley>»HOrn
Urban Decay Analysis
Technical Memorandum
Coffee and Rosedale Commercial Retail Development Project March 7, 2023, Revised 9/19/2025
Prepared By:

City of Bakersfield: Development Services – Planning Division Roque Nino, Principal Planner
1715 Chester Avenue, 2d Floor
Bakersfield, CA 93301
Prepared By:

PlaceWorks
3 MacArthur Place, Ste. 1100
Santa Ana CA 92707
714-966-9220
Urban Decay Analysis Technical Memorandum
Rosedale & Coffee Commercial Development Project Page i Contents
Summary ....................................................................................v

1. Introduction ........................................................................... 1 1A. Regional Location ....................................................................1 1B. Proposed Development.............................................................1 1C. Methodology ...........................................................................2 1D. Retail Types, Part 1: Convenience Goods ...................................3 1E. Retail Types, Part 2: Comparison Goods.....................................3 1F. Current Economic Conditions ....................................................4

2. Retail Trade Areas .................................................................. 4 2A. Competitive Facilities................................................................5 2B. Proposed Project Trade Area .....................................................8 2C. Gosford Village Trade Area ........................................................8 2D. Downtown and Valley Plaza Mall Trade Area ..............................8

3. Current Retail Market Demand............................................... 12 3A. Market Demand Generally ......................................................12 3B. Existing Opportunity Gap/Surplus.............................................14 3C. Current Market Demand .........................................................15

4. Expected Growth .................................................................. 16 4A. Trade Area Population and Households ....................................17 4B. Household Income................................................................. 18 4C. Market Demand Growth .........................................................19 4D. Pipeline Projects ....................................................................20 4E. Five-Year Pipeline Supply of New Retail Building Space.............22

5. Urban Decay Findings ........................................................... 23 5A. Existing Market Demand and the Proposed Project ....................24 Urban Decay Analysis Technical Memorandum
Page ii September 19, 2025
5B. Projected Market Demand in 2030 .........................................24 5C. Findings ...............................................................................25 Appendix ................................................................................. 26 Urban Decay Analysis Technical Memorandum
Rosedale & Coffee Commercial Development Project Page iii List of Figures
Figure 1: General Site Location ................................................................2 Figure 2: Competitive Shopping Centers/Areas and Their Basic Trade Area ................................................................................................7 Figure 3: Proposed Project Trade Area ....................................................10 Figure 4: Defined Trade Area for Gosford Village.......................................11 Figure 5: Defined Regional Trade Area for Downtown Bakersfield and Valley Plaza Mall.............................................................................12 List of Tables
Table 1 Comparison Goods Shopping Center Types ...................................4 Table 2: Opportunity Gap/(Surplus) in Current Dollars by Store Type; Proposed Project Trade Area and Comparison Trade Areas; 2025 Estimate.........................................................................................14 Table 3: Current Market Demand for Retail Development in Gross Building Square Footage; Proposed Project Trade Area and Comparison Trade Areas; 2025 Estimate...........................................16 Table 4: Population and Number of Households; Proposed Project Trade Area and Comparison Trade Areas; 2010 and 2020, 2025
Estimate, and 2030 Projection .........................................................17 Table 5: Average Annual Household Income; Proposed Project Trade Area and Comparison Trade Areas; 2025 Estimate and 2030 Projection.......................................................................................18 Table 6 Five-year Increase in Market Demand for Retail Development in Gross Building Square Footage; Proposed Project Trade Area and Comparison Trade Areas; 2025 to 2030 ...........................................19 Table 7: Five-Year Pipeline Supply of New Retail Development (GFA, sq. ft.) by Trade Area, 2025 to 2030 .....................................................22 Table 8: Estimated Retail Market Demand (GFA, sq. ft.) Before and After Proposed Project and Pipeline Supply by Trade Area; Existing 2025 and Projected 2030 ........................................................................23 Urban Decay Analysis Technical Memorandum
Page iv September 19, 2025
Table A-1: Retail Stores Opportunity Gap/Surplus; Proposed Project Trade Area; 2025 Estimate..............................................................27 Table A-2: Retail Stores Opportunity Gap/Surplus; Gosford Village Defined Trade Area; 2025 Estimate ..................................................30 Table A-3: Retail Stores Opportunity Gap/Surplus; Downtown Bakersfield and Valley Plaza Mall Defined Regional Trade Area; 2025 Estimate .....33 Table A-4: Opportunity Gap/Surplus by Store Type and Capture Adjustment; Proposed Project and Comparison Trade Areas; 2025 Estimate ........................................................................................36 Table A-5: Socioeconomic Characteristics; Proposed Project Trade Area; 2025 Estimate ...............................................................................38 Table A-6: Socioeconomic Characteristics; Gosford Village / River Walk Trade Area; Estimate 2025..............................................................46 Table A-7: Socioeconomic Characteristics; Downtown Bakersfield Regional Trade Area; Estimate 2025.................................................54 Urban Decay Analysis Technical Memorandum
Rosedale & Coffee Commercial Development Project Page v Summary
This memorandum provides an analysis of retail market demand in the metro-politan Bakersfield area to determine the potential of the proposed Rosedale and Coffee Commercial Development Project to cause urban decay impacts.

This analysis was originally prepared in 2023 and has been updated to reflect a change in the proposed project during the entitlement process and changes in market conditions during that time.

Areas Analyzed
The analysis defines the trade area for the proposed project, which is the area from which retail businesses at the proposed project are likely to draw the majority of their customers. As shown in Figure 3 on page 10, this trade area is generally located north of the Westside Parkway/Stockdale Highway and west of the 99 freeway/Airport Drive/Granite Road, and extending north and west from the proposed project about eight miles.

To assess the potential impacts to similar-scale retail centers outside of this defined trade area, the report also defines three other trade areas for analysis.

For southwest Bakersfield, which includes the Gosford Village and River Walk shopping centers, the trade area is generally located south of Westside Park-way/Stockdale Highway and west of the 99 freeway, extending out about eight miles to the south and west from Gosford Village, as shown in Figure 4 on page 11.

The final trade area is a regional trade area for both Downtown and Valley Plaza Mall. As show in Figure 5 on page 12, this area is defined as being with 12 miles from Downtown. The report provides an analysis for this overall regional trade area and a separate analysis for this trade area but excluding the trade areas for the proposed project and for Gosford Village.

Time Frame
The analysis estimates the current unmet market demand currently, as of 2025. In addition, to account for the cumulative impact of other retail devel-opments that may occur in the near term, the analysis also estimates the re-maining market demand in 2030.

Unmet Market Demand
As presented in this report, the analysis estimates the unmet market de-mand—the amount of retail building space that could be supported by con-sumer spending of trade area households that occurs outside of the trade area. The estimate for 2025 reflects the unmet demand after the development of the proposed project. The estimate for 2030 reflects the development of the Urban Decay Analysis Technical Memorandum
Page vi September 19, 2025
pipeline supply of other planned retail development projects. The resulting market demand estimates are shown in the following table.

The analysis shows that with the proposed project, each of the trade areas would still have unmet market demand in 2025. Furthermore, in 2030, after the construction of pipeline projects that are envisioned and may become op-erational, each of the trade areas will still have unmet market demand for ad-ditional retail businesses.

The one exception is the Gosford Village / River Walk trade area. However, this trade area includes two potential retail developments that are not cur-rently in the process of moving forward through site plan review. The first is the Crossroads Plaza Commercial Center, located the northwest corner of Pan-ama Lane and Gosford Road, south of the existing Gosford Village Shopping Center. In 2010, the City certified the EIR for this project with 786,000 square feet of retail building space. In 2024, the City approved a site plan for 312,030 square feet of commercial building space on a portion of the site, leaving the potential for up to 473,970 square feet of retail building space to fill out the site. The second potential development is Bakersfield Gateway Center at Hosking Avenue and H Street / CA-99. This could include 484,000 square feet of commercial building space. It is not clear that these two poten-tial developments in this trade area would be moving forward to be fully oper-ational by 2030. If all the potential retail projects in the Gosford Village / River Walk trade area were to be developer and operational by 2030, retail vacan-cies could occur. However, this result would occur regardless if the proposed project is developed.

Findings
The analysis finds that the proposed project is not expected to exceed market demand and, thus, will not cause long-term vacancies that could result in ur-ban decay.

Estimated Market Demand (gross floor area, square feet) After Proposed Project and Pipeline Supply of New Retail Development by Trade Area, 2025 and 2030 Trade Area
Proposed
Project
Gosford
Village/ River
Walk
Downtown /
Valley Plaza
Mall
Downtown
less Proposed
Project and
Gosford
Village
2022 Estimated Market Demand
(after the proposed project) 175,000 864,000 2,330,000 1,295,000 2027 Estimated Market Demand
(after pipeline supply) 159,070 (183,000) 850,000 893,000 Urban Decay Analysis Technical Memorandum
Rosedale & Coffee Commercial Development Project Page 1

1. Introduction
In 2004 the California Court of Appeals ruled that an environmental impact report should determine whether two proposed retail developments could cause long-term vacancies in other competitive retail centers, leading to urban decay. Followers of Jane Jacobs might herald this court ruling as a new tool for neighborhood preservation. Advocates of Joseph Schumpeter might decry this as judicial interference with the natural transformation of an economy, in which creative destruction fuels long-term economic growth. Regardless of philosophical bent, developers proposing retail now consider market demand and the potential impacts of exceeding that demand.

This market study analyzes the demand for retail building space in the Bak-ersfield area. It assesses the likelihood the proposed commercial development would exceed the demand. Finally, if the proposed development would exceed market demand, the market study identifies potential impacts.

The market study was originally prepared for the initial project submission in 2023. During the entitlement process, the project was modified. Most im-portantly for this analysis, the size of the project and the amount of retail building space was reduced. This analysis has been updated to reflect the smaller project size. The consumer spending estimates have been updated us-ing the US Consumer Price Index and the store sales estimates have been up-dated with the US Producer Price Index. Finally, the consultants re-vetted the estimated pipeline supply of new retail development with the City of Bakers-field. 1A. Regional Location
The project site encompasses approximately 46 acres at the southwest corner of Rosedale Highway and Coffee Avenue 7 in the City of Bakersfield, as shown on Figure 1. Rosedale Highway is a main east-west route through Bakersfield, becoming state route CA-178 as it traverses downtown. Coffee Avenue is a north-south arterial running the length of the city. On the north side of Rosedale is the Northwest Promenade shopping center, a major com-munity-scale commercial center. 1B. Proposed Development
The proposed project is to construct 405,531 gross square feet of commercial building space on the site. A portion of this square footage is tentatively ex-pected to be used for services (car wash, health club, medical offices, a bank, and public storage). The analysis excludes the 89,158 square feet of building space intended for services because these are not retail sales uses, which is the typical concern for urban decay impacts. Thus, the analysis determines Urban Decay Analysis Technical Memorandum