3917100 3917200 3917300 3917400 3917500 3917600
3917100 3917200 3917300 3917400 3917500 3917600
309100 309200 309300 309400 309500 309600 309700 309800 309900 310000 309100 309200 309300 309400 309500 309600 309700 309800 309900 310000 35° 23' 2'' N
119° 6' 6'' W
35° 23' 2'' N
119° 5' 29'' W
35° 22' 42'' N
119° 6' 6'' W
35° 22' 42'' N N 119° 5' 29'' W
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84 0 200 400 800 1200
Feet
0 50 100 200 300
Meters
Map Scale: 1:4,280 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
USDA
=
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Kern County, California, Northwestern Part Survey Area Data: Version 15, Sep 1, 2022
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Mar 12, 2022—Mar 22, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/15/2022
§
□ (I
D (b
'C1
{j
□ ....
~
181 ,,,.....,
• +-H
◊ ~
X ~
..
. ~
0 ~
A.
~ •
0 0
V
+
....
. .
0 J,
%f
USDA
=
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 125 Granoso loamy sand, 0 to 2
percent slopes
40.4 84.6%
257 Water 7.4 15.4%
Totals for Area of Interest 47.8 100.0%
Soil Map—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
12/15/2022
USDA
-
APPENDIX E
Sarah Vasquez | Biologist
SARAH VASQUEZ
BIOLOGIST
PROFESSIONAL SUMMARY
Biologist with experience in special-status species surveys, habitat assessments, biological monitoring, technical report preparation, environmental compliance, and regulatory support throughout Southern California. Experienced in coordinating field activities, documenting biological resources, evaluating habitat suitability, and preparing clear technical documentation for agency and client review.
CORE QUALIFICATIONS
• Special-status species presence/absence surveys, habitat assessments, preconstruction surveys, and biological monitoring. • Technical report preparation for biological resources and focused species surveys, including burrowing owl, desert tortoise, nesting birds, Crotch’s bumble bee, least Bell’s vireo, rare plants, and other sensitive biological resources. • Western Riverside County MSHCP consistency/compliance documentation, biological assessments, constraints analyses, and regulatory permitting support.
• Jurisdictional delineations, vegetation and habitat characterization, GPS-based field data collection, mapping support, and daily field reporting.
• Worker Environmental Awareness Program (WEAP) preparation, implementation of avoidance/minimization measures, and construction-compliance monitoring.
• Project coordination and management of biological field activities, schedules, documentation, and deliverables.
PROFESSIONAL EXPERIENCE
Hernandez Environmental Services | August 2021 - February 2026 • Senior Biologist, March 2025 - February 2026
• Biologist / Project Manager, prior role
Prior consulting experience included biological studies and monitoring in Riverside, Los Angeles, Imperial, Orange, and San Diego Counties; preparation of biological assessments and focused survey reports; MSHCP compliance documentation; jurisdictional evaluations; permitting support; mapping and field logs; and worker environmental awareness materials.
EDUCATION
• B.S., Biology, California State University, San Bernardino, 2021
SPECIALIZED TRAINING
• Introduction to Mojave Desert Tortoise, Desert Tortoise Council, 2021 • California Bumble Bee Atlas and Field Training, 2023
• Rare Plant Survey Protocols, 2024
• Wetland Delineation, 2022
1 Statement of Overriding Considerations and Statement of Facts and Findings for Riverview Marketplace Project General Plan Amendment No. 23-001
SECTION I - INTRODUCTION
An Environmental Impact Report (EIR) (State Clearinghouse No. 2025101507) has been prepared for the Riverview Marketplace Commercial Project (“Project”) in accordance with the California Environmental Quality Act (CEQA) (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.). The City of Bakersfield, Development Services Department – Planning Division is the Lead Agency for the Project under CEQA.
CEQA requires that the Lead Agency, before approving a project, identify each significant environmental impact of the project and make one or more written findings for each such impact.
Public Resources Code (PRC) Section 21002 provides that “public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available which would substantially lessen the significant environmental effects of such projects.” PRC Section 21081 and CEQA Guidelines Section 15091 provide that no public agency shall approve or carry out a project for which an EIR has been certified that identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding.
Pursuant to PRC Section 21081(a) and CEQA Guidelines Section 15091, for each significant environmental impact identified in the EIR, the Lead Agency must make one or more of the following three possible findings:
1. Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR.
2. Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency.
3. Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR.
The findings reported herein are based on substantial evidence in the entire record before the Lead Agency. The references set forth in these findings to certain pages or sections of the Draft EIR or Final EIR are for ease of reference and are not intended to provide an exhaustive list of the evidence relied upon for these findings.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
2 For each environmental issue area analyzed in the EIR, the following information is provided:
• Description of Significant Effect(s) - A description of the significant environmental effect(s) identified in the EIR.
• Project Design Features (PDFs) - A list of applicable Project Design Features that are incorporated into the Project.
• Mitigation Measures (MMs) - A list of applicable mitigation measures that are required as part of the Project.
• Finding - One or more of the three findings set forth above, as appropriate. • Rationale for Finding - A summary of the reasons for the finding(s).
With respect to a project for which significant impacts are not avoided or substantially lessened either through the adoption of feasible mitigation measures or feasible environmentally superior alternatives, a public agency, after adopting proper findings based on substantial evidence, may nevertheless approve the project if the agency first adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the project’s benefits rendered acceptable its unavoidable adverse environmental effects (California Code of Regulations, Title 14, Sections 15093 and 15043[b]; see also PRC Section 21081[b]).
SECTION II - ENVIRONMENTAL REVIEW PROCESS
The environmental review process for the Riverview Marketplace Commercial Project included the following key steps:
Notice of Preparation. Pursuant to Section 15082 of the CEQA Guidelines, the City circulated a Notice of Preparation (NOP) of the Draft EIR to State, regional, and local agencies, and members of the public for a 32-day public review period. The public review period began Friday, October 31, 2025, and concluded Monday, December 1, 2025. The purpose of the NOP was to formally notice that the City was preparing a Draft EIR for the Project, and to solicit input regarding the scope and content of the environmental information to be included in the Draft EIR. Four written comment letters were received during the scoping period.
Scoping Meeting: The City also held an EIR Scoping Meeting for the Project on Thursday, November 20, 2025. The purpose of the EIR Scoping Meeting was for the City to solicit input and written comments from agencies and the public on environmental issues or alternatives they believe should be addressed in the Draft EIR. A presentation explaining the Project was provided and potential attendees were given an opportunity to provide their comments on the scope of the Draft EIR. No members of the public attended the EIR Scoping Meeting, and no comments were received at the meeting.
Draft EIR. The Draft EIR was published on July 10, 2026, and is incorporated herein by reference in full. The Draft EIR was circulated for a 45-day public comment period in accordance with CEQA Guidelines Section 15105. The Draft EIR is a “Project EIR” as defined by Section 15161 of the CEQA Guidelines, which examines the environmental impacts of a specific development project. A Notice of Completion and Availability (NOCA) was distributed on July 10, 2026, to all property owners within 300 feet of the Project, which informed them where they could view the document Riverview Marketplace Commercial Project
Environmental Impact Report Findings
3 and how to comment. The Draft EIR was available to the public at the City of Bakersfield, Planning Division offices and the following local library: Kern County Beale Memorial library. A copy of the document was also posted online at https://www.bakersfieldcity.us/environmental-documents.
Notices were filed with the County Clerk on July 10, 2026. The NOCA was also sent with the Draft EIR to the Governor’s Office of Planning and Research State Clearinghouse for distribution to State Agencies and notice was provided in notice was provided in the Bakersfield Californian newspaper of general circulation
Final EIR. The Final EIR was published on September 18, 2026, which is hereby incorporated by reference in full. The Final EIR constitutes the second part of the EIR for the Project and is intended to be a companion to the Draft EIR. The Final EIR also incorporates the Draft EIR by reference. Pursuant to Section 15088 of the CEQA Guidelines, the City, as Lead Agency, reviewed all comments received during the review period for the Draft EIR and responded to each comment in Section II, Responses to Comments, of the Final EIR. On September 21, 2026, responses were sent to all public agencies that made comments on the Draft EIR at least 10 days prior to certification of the EIR pursuant to CEQA Guidelines Section 15088(b).
Public Hearing. A noticed public hearing for the Project was conducted by the City Planning Commission on October 1, 2026.
SECTION III - RECORD OF PROCEEDINGS
For purposes of CEQA and these Findings, the administrative record of proceedings for the Project consists of those items listed in CEQA Guidelines Section 15091(e), and includes, but is not limited to, the following documents:
• The Draft EIR for the Riverview Marketplace Commercial Project (2025101507) and all appendices thereto;
• The Final EIR for the Riverview Marketplace Commercial Project (2025101507), including all responses to comments, corrections, clarifications, and additions; • The Notice of Preparation (NOP) distributed on October 31, 2025, and all comments received in response thereto;
• All technical reports, studies, memoranda, maps, and other documents relied upon or referenced in the Draft EIR and Final EIR;
• All written comments submitted by agencies or members of the public during the public comment period on the Draft EIR;
• The Mitigation Monitoring Program (MMP)
• All testimony provided at public hearings on the Project; • The California Environmental Quality Act (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.);
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
4 • The Resolutions approved and adopted by the City in connection with the proposed Project, all documents incorporated by reference therein, and comments received after the close of the comment period and responses thereto;
All other documents referenced in or relied upon in the preparation of the Draft EIR and Final EIR, including but not limited to the City of Bakersfield General Plan, Municipal Code and all applicable specific plans, ordinances, and regulations.
SECTION IV - PROJECT DESCRIPTION
Project Overview
The Project Site is located on a portion of a larger property formerly occupied by the Pacific Gas & Electric (PG&E) Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells, electrical transmission lines on metal poles, towers, and wooden poles, and several dirt roads and mounds.
The Project involves construction and operation of the Riverview Marketplace, a commercial retail center that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.
The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas in front of storefronts, and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks, and a lawn area.
Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas. The discretionary entitlements, reviews, permits, and Riverview Marketplace Commercial Project
Environmental Impact Report Findings
5 approvals required to implement the Project include, but are not necessarily limited to, the following:
• Site Plan Review consistent with the Bakersfield Municipal Code Section 17.08.140. • General Plan Amendment (GPA) of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Tentative Tract Map
• Comprehensive Sign Plan
Project Objectives
The objectives of the Project are as follows:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design. • A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby. • Creation of new and future employment opportunities.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought-tolerant landscaping that visually enhances the Project Site and surrounding perimeter.
• A visually harmonious development as viewed both internally and externally.
V. NO IMPACT OR LESS THAN SIGNIFICANT WITHOUT MITIGATION Substantial evidence in the record supports the determination in the EIR that the Project would have no impact or a less than significant impact in the following areas without the need for mitigation measures. Based on the analysis contained in the Draft EIR, the City finds that the following environmental topics would not be significantly affected by the Project.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
6 No Impact or Less Than Significant
Aesthetics
The Project Site is not located in an area designated as scenic in the Metropolitan Bakersfield General Plan; it is not within the City’s Hillside Development Combining Zone and is not within a City-designated Class I or II Visual Resource Area, Viewshed, or Slope Protection Area. The Project is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, the Project would not block a view corridor of a scenic resource.
The construction of commercial uses at the Project Site would be in character and compatible with existing urban land uses in the vicinity of the Project Site and is a natural extension of the urban growth occurring in the Project area. The Project, once developed, would improve the visual conditions on the Project Site. The Project would have a contemporary architectural design with articulated facades. Building materials would include, but not be limited to, cement plaster with stone veneer, aluminum wood siding metal canopies, and large display windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road frontage and Rosedale Highway frontages would run a “dry creek” feature composed of decorative cobbles, decomposed granite and crushed rocks. The Project would feature new landscaping along the entire site perimeter and internal to the Project Site.
Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian-oriented experience, and provide shade. Therefore, the Project would not have a substantial adverse effect on a scenic vista, and impacts are less than significant.
The Project Site is located within an urban area, surrounded by existing development. According to the Caltrans California State Scenic Highway System Map, the Project Site is not located within a scenic highway. The nearest eligible State scenic highway in Kern County is the Cuyama Highway State Route 166 (SR 166) located approximately 40-miles southwest of the Project Site.
Therefore, no impact would occur.
The Project would be consistent with the goals and policies of the General Plan as it relates to new commercial development. The Project proposes to transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions. The Project would have a contemporary architectural design with articulated facades. Buildings would have a maximum height of 90 feet (60 feet below the maximum building height for the M-2 zoning district). Accordingly, the Project, would comply with the applicable zoning requirements pertaining to scenic quality and impacts would be less than significant.
The Project Site is located in an urbanized area of the City, which includes nighttime lighting associated with the surrounding land uses. This includes street lighting, parking lot lighting, and lights from vehicles. Nearby light sensitive receptors consist of residential developments to the west, southwest, and north of the Project Site.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
7 Construction activities would be limited to daytime hours per BMC Section 9.22.050: 6:00 AM to 9:00 PM Monday through Friday, and 8:00 AM to 9:00 PM on weekends and holidays.
Construction activities would not require nighttime illumination. Daytime construction equipment may produce temporary glare from metal surfaces; however, these effects would be short-term, intermittent, localized to the Project Site, and typical of construction activities in urbanized areas. As construction would not occur outside permitted hours and would not require nighttime lighting, construction-related light and glare impacts would be less than significant.
Operational lighting for the Project is intended to minimize light trespass and glare from the Project Site onto adjacent properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination. Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new building; lighting for pedestrian walkways and common gathering areas; lighting for the green spaces; ground-mounted decorative lighting for landscape and architectural features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.
All new light sources associated with the Project would be required to comply with the Bakersfield Municipal Code for exterior lighting standards, which prevent light spillover, glare, nuisance, inconvenience, or hazardous interference of any kind on adjacent properties and streets. Mandatory compliance with the Bakersfield Municipal Code would ensure that the Project’s light fixtures and signage would not introduce any design features that would cause artificial light or glare to an extent that would adversely affect day or nighttime views in the area.
Thus, potential lighting and glare impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Aesthetics.
Agriculture and Forestry Resources
The Project site is located within an urban area, surrounded by existing development, and is not currently in use for agricultural activities or forest uses. Based on a review of the California Important Farmland Finder, neither the Project Site nor any adjacent land is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Instead, the Project Site and adjacent land are designated as “Vacant and Disturbed Land” and “Urban and Built-Up Land,” with the exception of an approximately 17-acre parcel of “Semi-Agricultural and Rural Commercial Land,” which is not considered protected farmland. As such, the Project would not convert any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to a non-agricultural use. Neither the Project Site nor its surroundings are zoned for agriculture or forest land.
The Project would not result in the conversion of farmland to non-agricultural use or the conversion of forest land to non-forest use. No impacts to agriculture and forestry resources. would occur.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact to Agriculture and Forestry Resources.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
8 Air Quality (Pollutant Concentrations)
The Project would develop retail and commercial (e.g., medical office, and health club) land uses.
Operation of the proposed uses could include occasional use of landscaping equipment and natural gas consumption for commercial cooking uses. However, air pollutant emissions generated from these activities would be nominal.
The Project would include a gas station with up to 40 fuel dispensers. CARB recommends avoiding siting gas stations within 500 feet of sensitive land uses to avoid exposing sensitive receptors to substantial concentration of air pollutants. The nearest potential sensitive land uses to the proposed gas station would be the two buildings across El Toro Viejo Road, approximately 650 feet to the west, which would be outside the 500-foot buffer. Furthermore, emissions of contaminants (TACs) from stationary sources that may be associated with the proposed uses (e.g., restaurant chain-driven char broiler), including the proposed gas station, would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits. Regulations would ensure that stationary source emissions (permitted sources) would be reduced or mitigated below San Joaquin Valley Air Pollution Control District (SJVAPCD). significance thresholds of 20 in one million cancer risk and one for acute risk at the maximally exposed individual.
While the Project could generate heavy-duty truck travel along the local roadways, the Project would only incrementally increase average daily trips for all vehicle types along the local roadways. Because the Project would not have any warehousing uses and would primarily consist of retail, restaurant, and commercial uses, it is anticipated that Project-related traffic volumes would primarily consist of passenger vehicles associated with patrons. Thus, the incremental increase in vehicle trips that could result from implementation of the proposed Project would be below roadway volumes identified by the California Air Resources Board (CARB) land use siting screening criteria to avoid exposing sensitive receptors to substantial concentrations of air pollutants from vehicles traveling along roadway. Therefore, operation of the Project would not expose nearby off-site sensitive receptors to substantial concentrations of TACs. Potential impacts would be less than significant.
CO Hotspots
Areas of vehicle congestion have the potential to create pockets of CO called hotspots. These pockets have the potential to exceed the State 1-hour standard of 20 ppm or the 8-hour standard of 9.0 ppm. Hotspots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. However, emissions from motor vehicles, the largest source of CO emissions, have been declining since 1985, despite increases in Vehicle Miles Traveled (VMT), due to the introduction of new automotive emission controls and fleet turnover.
Furthermore, under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection to more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact. Overall, implementation of the Project would result in overall peak hour turning volumes Riverview Marketplace Commercial Project
Environmental Impact Report Findings
9 that would not produce the volume of traffic required to generate a CO hotspot. Therefore, implementation of the Project would not have the potential to substantially increase CO hotspots at intersections in the vicinity of the Project Site. Impacts would be less than significant.
Construction Health Risks to Off-Site Receptors
The maximum incremental cancer risk levels during the construction phase of the Project at the Maximum Exposed Individual Resident (MEIR) and Maximum Exposed Individual Worker (MEIW) are 1.5 per million and 0.3 per million, respectively, which would not exceed the cancer risk significance threshold of 20 in one million. For noncarcinogenic effects, the hazard index identified for each toxicological endpoint totaled less than one for the MEIR and MEIW.
Therefore, chronic noncarcinogenic hazards are within acceptable limits, and project-related construction activities would not expose nearby sensitive receptors to substantial pollutant concentrations. Impacts would be less than significant.
Air Quality (Objectionable Odors)
The type of facilities that are considered to have objectionable odors include wastewater treatment plants, compost facilities, landfills, solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and food manufacturing facilities. The uses proposed by the Project do not fall within these land uses.
During project-related construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily generate odors. However, any construction-related odor emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reached any sensitive receptor, they would be diluted to well below any level of air quality concern. Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of odor-producing materials. Thus, overall, construction and operation of the Project are not expected to generate odors that would adversely affect a substantial number of people. Impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Air Quality (Objectionable Odors and Pollutant Concentrations).
Biological Resources (Riparian habitat or other sensitive natural community) The Project site is highly disturbed. There are no wetlands or riparian habitats found on or near the Project Site. The November 2025 survey completed for the Project confirmed that there are no wetlands or riparian habitats found on the Project Site. Aerial images indicated and the November 2025 field survey confirmed that an underground stormwater feature exists near the east border of the Project Site. The feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, the General Biological Assessment determined that this stormwater feature exists underground and is not jurisdictional waters.
Therefore, no impacts to jurisdictional waters would occur from Project implementation.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
10 Accordingly, jurisdictional waters would not be impacted by Project implementation and no impact to any riparian habitat or other sensitive natural community identified would occur.
Biological Resources (Wetlands)
The Project would not impact riparian areas, vernal pools or other jurisdictional aquatic resources because these features do not occur on or near the Project Site. As noted above, an underground drainage feature was identified underneath the Project Site, but this is not considered a protected wetland. Therefore, no impacts would occur.
Biological Resources (Wildlife Movement)
No wildlife movement corridors were found to be present on the Project Site. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby, which are typically used by wildlife for movement. There are no water features on the Project Site that would support the movement of native or migratory fish. Furthermore, the Project Site is an urbanized environment and is blocked off on the east end by railroad tracks and a residential area to the west. However, urban SJKF can move through disturbed open land between developed parcels. The open 46.16-acre Project area may therefore function as a local stepping-stone or permeable movement area. With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant. To avoid impacts to Crotch’s Bumble Bee and the San Joaquin Kit Fox, MM BIO-4-10 would be implemented
Biological Resources (Habitat Conservation Plan, Natural Community Conservation Plan)
The Project Site is not located within the boundaries of an approved and active State or federal Habitat Conservation Plan. The Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) and associated Incidental Take Permit (ITP) expired on January 1, 2023. As such, the Project must comply with direct requests from U.S. Fish and Wildlife Service (USFWS) or California Department of Fish and Wildlife (CDFW).
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Biological Resources (Riparian habitat or other sensitive natural community, wetlands, wildlife movement, Habitat Conservation Plan, Natural Community Conservation Plan) Cultural (Historic Resource)
The records search conducted for the Project have revealed that 20 previous cultural resource studies have taken place, and 14 cultural resources have been identified within one-half mile of the Project Site. Three of the previous studies assessed portions of the Project Site for cultural resources, and one resource (a historic-period refuse scatter designated P-15-3290) was previously identified within the Project Site boundaries; however, during the field survey conducted as part of the Cultural Resources Assessment, the resource was not able to be located and assumed to be destroyed. Four additional historic-period cultural resources were identified and evaluated against the California Register. These identified resources were recommended not Riverview Marketplace Commercial Project
Environmental Impact Report Findings
11 eligible for the California Register and therefore are not considered a historic resource under CEQA consistent with CEQA Guidelines Section 15064.5. As such, impacts to historical resources would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Historic Resources.
Energy
To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. Moreover, all construction equipment would cease operating upon completion of the Project construction. Thus, energy use during the construction of the proposed Project would not be considered inefficient, wasteful, or unnecessary.
During operation, the Project would result in electricity demand; however, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the proposed Project would install rooftop PV systems and battery storage systems.
Furthermore, compliance with CALGreen would contribute to reducing indoor water use, which would also contribute to minimizing electricity demand from the transport and distribution of water. Thus, electricity use from the operation of the proposed Project would not be considered inefficient, wasteful, or unnecessary. Development pursuant to the proposed Project would result in a net increase in natural gas demand. The proposed Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing the energy efficiency of the proposed buildings.
While the operation of the Project would result in fuel usage, the Project Site is within a half mile of bus stops for three Golden Empire Transit bus routes and would be accessible from the existing surrounding sidewalks and class II bike lanes along Rosedale Highway and Coffee Road. The proposed Project would also provide bicycle parking and lockers. These amenities could contribute to minimizing vehicle trips and VMT. In addition, fuel efficiency standards for automobiles are established nationwide under the Corporate Average Fuel Economy (CAFE) standards and ensure that vehicles produced in future years have greater fuel efficiency, and generally result in an overall benefit of reducing fuel usage by providing the population of the City and region with more fuel-efficient vehicle options. Thus, it is expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.
The Project would be subject to the 2026 Building Energy Efficiency Standards and, in compliance with those standards, would install battery storage and rooftop PV systems. These systems would support the statewide transition to renewable energy. Therefore, implementation of the Project would not conflict with or obstruct plans for renewable energy and energy efficiency.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
12 Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Energy.
Geology and Soils (Excluding Paleontological Resources) The Geotechnical Investigation concluded that all geologic and seismic hazards, including fault rupture, seismic ground shaking, liquefaction, settlement, lateral displacement, landslides, flooding, tsunamis, erosion, and subsidence, present low risk with mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Geology and Soils (Excluding Paleontological Resources).
Hazards and Hazardous Materials
A Phase I Environmental Site Assessment (Phase I ESA), a Soil Vapor Sampling Report (Soil Vapor Report) and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), were prepared for the Project.
The Phase I ESA determined that there is one controlled recognized environmental condition (CREC) in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the Central Valley Regional Water Quality Control Board (CVRWQCB). The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the Project Site. As such, no hazards currently exist on the Project Site that could affect construction.
All construction activities would comply with laws, regulations, and policies governing the use of hazardous materials, ensuring that Project implementation would not serve to increase public or environmental exposure to hazardous materials and preventing impacts related to accident or upset conditions. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process.
While Valley Fever is associated with soil disturbance, impacts associated with Valley Fever are related to the Coccidioides fungal spore, which is a biological agent. In general, a CEQA-level air quality framework and analysis evaluate potential impacts associated with criteria air pollutants and toxic air contaminants, which are chemical pollutants. However, ground disturbing activities can aerosolize fungal spores present in project soils, creating a potential inhalation exposure pathway. Risk is generally elevated during dry, windy conditions and in years following drought (dry soil is more easily aerosolized), and disturbance of previously undisturbed or long-undisturbed soils poses higher risk than disturbance of soils that have been recently worked.
Fugitive dust suppression measures generally reduce impacts from Valley Fever. Because the Riverview Marketplace Commercial Project
Environmental Impact Report Findings
13 proposed Project is a non-residential project that would disrupt more than five acres of land, it would be subject to San Joaquin Valley Air Pollution Control District (SJVAPCD) Rule 8021 to minimize fugitive
dust during construction activities. Under Rule 8021, the proposed Project would be required to prepare Riverview Marketplace Commercial Project and submit a Dust Control Plan (DCP) to the SJVAPCD for approval. The DCP would be required to detail specific actions to ensure that visible dust emissions do not exceed 20 percent opacity. These actions can include watering areas of soil disturbance and use of dust suppressants. Compliance with Rule 8021 would help minimize generation of fugitive dust.
In addition, construction contractors would be subject to California Occupational Safety and Health requirements enforced through California Division of Occupational Safety and Health (Cal/OSHA) oversight. Under Section 3203, Title 8 of the California Code of Regulations (Title 8 CCR Section 3203), construction employers for the proposed project would be required to identify workplace hazards, implement a system to communicate occupation safety and health-related matters to employees, and implement a system to ensure employees comply with safe and healthy work practices. Title 8 CCR Section 5141 would require construction employers to implement appropriate engineering controls to control harmful exposure to employees while Title 8 CCR Section 5144 would oversee use of respirators for employers when necessary to protect their health. Because Kern County is identified as a highly endemic region for Valley Fever under California Labor Code Section 6709, construction contractors for the Project would be required to provide training and awareness on Valley Fever for the employees pursuant to the Section. Overall, implementation of SJVAPCD fugitive dust control measures and compliance with workplace occupational safety and health requirements and Cal/OSHA oversight would minimize potential Valley Fever exposure to construction workers and no significant impacts would occur.
Project operations would likely involve typical hazardous materials/chemicals such as cleaners, paints, solvents, and fertilizers and pesticides for site landscaping for most of the commercial uses, and regular use of hazardous materials during operation of the gas station and car wash.
Any routine transport, use, and disposal of these materials during Project operations would adhere to federal, State, and local regulations for the transport, handling, storage, and disposal of hazardous substances. Therefore, with adherance to these mandatory requirements, the Project would not pose a significant threat related to the release of hazardous materials into the environment. Impacts would be less than significant.
As identified in the Phase I ESA, the Project Site is neither on the Cortese List currently or historically. However, eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with potential impacts to soil, soil vapor, and/or groundwater. However, based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. Accordingly, Project construction and operation would not create a significant hazard to the public or the environment. Impacts would be less than significant.
The Project is not located within two miles of a public airport, which would result in a safety hazard or excessive noise for people residing or working in the Project area. According to the Riverview Marketplace Commercial Project
Environmental Impact Report Findings
14 California Department of Forestry and Fire Protection (CAL FIRE), the Project Site is not within or in proximity to a Very High Fire Hazard Severity Zone (VHFHSZ). The Project Site is located within a Local Responsibility Area and currently receives fire protection services through a Joint Powers Agreement with Bakersfield Fire Department (BFD) and Kern County Fire Department (KCFD).
Calls for service from the Project Site would be addressed by KCFD. No aspect of the Project would prevent the implementation of the Kern Multi Jurisdictional Hazard Mitigation Plan (MJHMP) and Emergency Operations Plan.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Hazards and Hazardous Materials.
Hydrology and Water Quality
The Project would be required to comply with all applicable federal, State, and local regulations pertaining to surface water and groundwater quality, including the General Permit requirements under the National Pollutant Discharge Elimination System (NPDES) program for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a Stormwater Pollution Prevention Plan (SWPPP) would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite, as well as establish measures to reduce the potential for erosion.
The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with the General Permit and MS4 Permit, the project would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.
The Water Supply Assessment completed for the Project includes projections for 2025 through 2040 that show that the Project’s Domestic Water System can adequately meet the Project's demand without depleting groundwater or affecting its overall quality. Accordingly, the Project would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.
The Project Site is located within Zone X, which denotes an area with reduced flood risk. While upon completion of construction, the amount of impervious surface on the Project Site would be increased when compared to existing conditions, the Project’s drainage facilities would be designed to ensure that all on- and off-site drainage and storm drain facilities would be adequately sized to accommodate runoff from storm events consistent with the recommendations included in the Drainage Study prepared for the Project. Additionally, the proposed Project would not alter the course of a stream or river that would result in flooding.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
15 Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Hydrology and Water Quality.
Land Use and Planning
The Project Site is surrounded by Rosedale Highway and the Northwest Promenade to the north; a PG&E electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east. The Project would not include the development of new obstacles that would divide the existing community. Additionally, the Project would connect to the existing roadway system and other infrastructure and would not involve the reconfiguration of streets that could have the potential to alter the surrounding pattern of future development.
The Project’s proposed commercial center would be consistent with the surrounding commercial uses, as well as the amended General Plan designation and current zoning designation, thus implementing the City’s vision for the area.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Land Use and Planning.
Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Moreover, the Project does not propose operations that would encroach upon existing oil operations The Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, the Project would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. No mitigation is required.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Mineral Resources.
Noise
Construction noise levels associated with the Project were modeled and were found to be below the Federal Transit Administration (FTA) thresholds for residential and commercial uses.
Therefore, Project related construction noise impacts would be less than significant. As concluded in the Noise analysis prepared for the Draft EIR, operational noise impacts that include operation of the car wash, commercial uses, unloading and loading, mechanical equipment, drive-thru, and related traffic operations were found to be less than significant.
Construction vibration levels would be below thresholds for vibration levels and any related architectural damage vibration impacts would be less than significant. Commercial uses would not be immediately adjacent to vibration-sensitive uses and no significant vibration impacts Riverview Marketplace Commercial Project
Environmental Impact Report Findings
16 would occur from vibration generated by operation of the Project. Therefore, Project related operational vibration impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Noise.
Population and Housing
The Project would not displace existing people. The Project proposes the development of a commercial retail center and does not include a residential component that would result in an increase of residents and population within the City. As such, the Project would not directly induce population growth.
Indirectly, the Project does not propose the extension of roads or existing infrastructure that would result in indirect growth within the City. The Project is expected to require 969 employees.
Although operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Thus, employees would likely be drawn from the existing population. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Population and Housing.
Public Services
Project development and operation would result in an incremental increase in demand for fire protection services. However, as a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire protection services. Additionally, the Project would be constructed pursuant to code requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by the BFD and the KCFD.
Further, the Project would be subject to applicable development impact fees relating to fire protection. Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.
As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand. However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or Riverview Marketplace Commercial Project
Environmental Impact Report Findings
17 other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand. Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant Regarding impacts to schools, the Project would develop a commercial development and would not require development of new housing. It is anticipated that future employees of the Project would reside within the City and immediately surrounding area. Therefore, the Project is not anticipated to result in substantial, unplanned population growth.
The State of California requires payment of development impact fees to mitigate project impacts to school facilities (CGC Section 65996; SB 50). All new residential, commercial, and industrial construction and/or an addition of covered or enclosed space are subject to the collection of developer fees. This fee is determined by the square footage of assessable space, which is measured from the perimeter of the structure. These fees pay for facility expansion and upgrades needed to serve new students. It is not anticipated that the proposed Project would generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impact to school facilities. Therefore, impacts would be less than significant.
It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project Site would be nominal.
Accordingly, the Project is not anticipated to affect service ratios, response times, or other performance objectives for parks and would not require the construction of any new or altered park facility. Therefore, impacts to parks would be less than significant.
Kern County Library operates libraries in close proximity to the Project Site, including the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southwest of the Project Site. As discussed, it is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Public Services.
Recreation
Increase in the demand for existing neighborhood and regional parks or other recreational facilities typically occurs due to an increase in the residential population. The Project does not include residential components, and it is anticipated that future employees would reside within the City and immediately surrounding area. Accordingly, the proposed Project would not result in an increase in population and would not increase demand on existing recreational facilities to a degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond Riverview Marketplace Commercial Project
Environmental Impact Report Findings
18 what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Recreation.
Transportation, (Plan, Ordinance or Policy, Hazardous Geometric Design) The Project would be required to provide infrastructure improvements needed to meet the demand created by the development and provide off-site improvements designed to ensure the construction of the local and regional transportation networks to their ultimate classifications.
These improvements could be funded through a development fee payment towards adopted funding mechanisms such as the Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements, and the Project will pay its fair share contribution towards the cost of these improvements. All required improvements for the Project are already included as part of the design or would be funded by the Bakersfield RTIF program, which the Project applicant would be responsible for contributing to. Therefore, no additional improvements or mitigation would be required and the Project would be consistent with General Plan LOS requirements. As the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities, impacts would be less than significant.
The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by BFD and KCFD, which have an existing Joint Powers Agreement (JPA) to provide emergency services to the Project Site. Sight distance at each of the Project’s access point would be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. In consideration of regulatory requirements and the improvements, the Project would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Transportation (Plan, Ordinance or Policy, Hazardous Geometric Design).
Utilities and Service Systems
As detailed in the Water Supply and Demand Analysis, Sewer Area Study and technical report addressing energy that were prepared for the Project, the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects, therefore, impacts related to utilities and service systems would be less than significant. In addition, adequate water, sewer, drainage, energy and telecommuting infrastructure exists to serve the Project. Furthermore, the Project Riverview Marketplace Commercial Project
Environmental Impact Report Findings
19 would not require or result in the relocation or construction of new or expanded water or wastewater treatment facilities.
Construction associated with the Project would result in solid waste associated primarily with grading activities. There would be limited construction demolition debris. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals.
The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. As such, the Project would not generate solid waste in excess of State or local standards or otherwise impair the attainment of solid waste reduction goals, and impacts would be less than significant.
The Project would be served by the Metropolitan Sanitary Landfill/Bena Landfill, operated by the Kern County Public Works Department. This Class III municipal solid waste facility has a permitted maximum throughput of 4,500 tons per day and an estimated remaining capacity of approximately 22 million tons, equating to approximately 21 years of operation at current disposal rates.
Regarding the Project’s operation, the Project would generate an estimated disposal volume of 474 tons per year (1.3 tons/day). This generation represents approximately 0.03 percent of the landfill’s permitted daily throughput and an even smaller fraction of its remaining capacity. Given the minimal contribution of both operational and construction solid waste relative to available landfill capacity, the fact that the waste stream is accounted for in the County Integrated Waste Management Plan, and the Project’s compliance with all applicable waste reduction and diversion requirements, the Project would not generate solid waste in excess of state or local standards, exceed the capacity of local infrastructure, or impair the attainment of solid waste reduction goals. Therefore, impacts would be less than significant, and no further analysis is warranted.
The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Utilities and Service Systems.
Wildfire
The Project Site is not located in a State Responsibility Area (SRA) or lands classified as Very High Fire Hazard Severity Zones (VFHSZs). During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the BFD and KCFD. Because the Project is required to comply with all applicable City codes, including the CBC and California Fire Code, which has been incorporated into the City’s Municipal Codes, and is not located in a VHFHSZ, construction and operation of the Project would not increase the risk of fire, nor would it require the installation/maintenance of infrastructure Riverview Marketplace Commercial Project
Environmental Impact Report Findings
20 that would exacerbate fire risk. Furthermore, compliance with the California Fire Code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, no impact would occur.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Wildfire.
VI. Less Than Significant Impacts with Mitigation
The EIR identified certain impacts that would be less than significant with implementation of mitigation measures. For each of the following impacts, the City makes the finding pursuant to Public Resources Code Section 21081(a)(1) that changes or alterations have been required in, or incorporated into, the Project which mitigate or avoid the significant effects on the environment.
Air Quality (Air Quality Plan and Criteria Pollutant)
The SJVAPCD is responsible for reducing emissions from area, stationary, and mobile sources in the SJVAB to achieve the National and California Ambient Air Quality Standards (AAQS). A consistency determination with the AQs plays an important role in local agency project review by linking local planning and individual projects to the Air Quality Management Plans (AQMPs).
It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in the AQMPs.
Kern Council Of Governments (KCOG) is one of SJVAPCD’s partners in the preparation of the AQMPs, providing the latest economic and demographic forecasts and developing transportation measures in Kern County. Regional population, housing, and employment projections developed by Kern COG are based, in part, on the City’s General Plan land use designations. These projections form the foundation for the emissions inventory of the AQMPs and are incorporated into the regional transportation plan/sustainable communities strategy (RTP/SCS) prepared by Kern COG to determine priority transportation projects and vehicle miles traveled in the Kern COG region. Because the AQMPs’ strategies are based on projections from local general plans, projects that are consistent with the local general plan are considered consistent with the air quality-related regional plan. Additionally, only large projects have the potential to substantially affect the demographic forecasts in the AQMPs.
The Project Site is designated as P and zoned as M-2. As part of the Project, the General Plan designation would be amended to change the designation from P to LI, which both allows for the Project’s use and aligns with its existing zoning designation.
Also, under CEQA Guidelines Section 15206(b), a proposed project is considered of statewide, regional, or area-wide significance if the project is a commercial office building of 250,000 square feet or more or employs 1,000 or more employees and/or a shopping center of 500,000 square feet or more or employs 1,000 or more employees. The amount of retail space proposed and the projected number of new jobs generated would be less than 500,000 square feet and 1,000 Riverview Marketplace Commercial Project
Environmental Impact Report Findings
21 employees. Thus, the Project would not substantially affect demographic projections beyond what is accounted for in the AQMPs.
However, per SJVAPCD guidance, project consistency with the AQMPs is based on whether project emissions would exceed the SJVAPCD regional significance thresholds. The Project would exceed the regional operation significance thresholds for VOC and NOX and would cumulatively contribute to the nonattainment designations in the SJVAB without mitigation.
The Project would implement Mitigation Measure (MM) AQ-1, which would require a Voluntary Emission Reduction Agreement (VERA) for the Project; MM AQ-2, which restricts paints and coatings that can be used for the Project; and MM GHG-3, which requires landscaping equipment to be all electric. Implementation of these MMs, in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510, would, at minimum, offset the amount of Project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Implementation of MM AQ-1 would also ensure consistency of the proposed Project with the applicable SJVAPCD air quality plans and ensure that operation of the Project would not cumulatively contribute to the nonattainment designations of the SJVAB. . As such, impacts would be less than significant with mitigation incorporated.
Mitigation Measures
MM AQ-1 Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, execution of the VERA.
MM AQ-2 The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Air Quality (Air Quality Plan and Criteria Pollutant).
Biological Resources (Sensitive Species, Local Policies) The Project site is highly disturbed and located in a highly urbanized area. It does not provide suitable habitat to support these species. Accordingly, the Project would not have a substantial Riverview Marketplace Commercial Project
Environmental Impact Report Findings
22 adverse effect on any species identified as a candidate, sensitive, or special-status species in local and regional plans, policies, or regulations, or by the CDFW or USFWS.
Additionally, as discussed above, migratory non-game native bird species are protected under the Migratory Bird Treaty Act (MBTA) and the California Fish and Game Code prohibits take of all birds and their active nests. The Western burrowing owl (BUOW) was approved by the California Fish and Game Commission as a candidate species for listing under the California Endangered Species Act (CESA) in 2024 and, therefore, receives the same legal protection afforded to state listed threatened and endangered species. The Project Site does not contain suitable habitat for the BUOW and it was not present on the Project Site during the field survey. However, because BUOWs may become established on disturbed sites prior to construction, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in Mitigation Measure (MM) BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.
Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the potential for the Project to impact MBTA protected birds exists. If vegetation removal and other ground disturbance activities can be conducted outside of the recognized nesting bird season, impacts to nesting birds are not expected. However, if work cannot be avoided during the nesting bird season, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity (for instance, mobilization of heavy equipment). With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant.
Additionally, in reviewing the applicable General Plan goals, policies, and implementation programs the Project would be consistent with the General Plan by avoiding impact to sensitive biological communities and species by creating a buffer around nesting birds protected by the MBTA and surveying and buffering the BUOW through the implementation of MM BIO-1 through MM BIO-3. To avoid impacts to Crotch’s Bumble Bee and the San Joaquin Kit Fox, MM BIO-4-10 would be implemented.
Accordingly, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant with mitigation.
Mitigation Measures
MM BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Depending on the time Riverview Marketplace Commercial Project
Environmental Impact Report Findings
23 elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of construction, additional focused surveys may be required during the survey season immediately preceding construction. As specified in the 2012 Staff Report, one 30-day pre-construction survey is recommended; however, multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may colonize a site following previous negative survey results. Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to construction activities.
MM BIO-2 Burrowing Owl (BUOW) Avoidance Buffer. If western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to halt work if project activities are causing disturbance to western burrowing owls. In the event a burrowing owl or known burrowing owl den (active or inactive) is detected, and the no disturbance buffers outlined in the 2012 Staff Report on Burrowing Mitigation are not feasible, consultation with CDFW shall be warranted to discuss how to implement the project and avoid take. If take cannot be avoided, take authorization through the acquisition of an incidental take permit pursuant to Fish and Game Code Section 2081, subdivision (b), shall be necessary to comply with the California Endangered Species Act.
MM BIO-3 Nesting Birds. If ground disturbing and vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy equipment) of all areas of the Project Site that could be directly or indirectly impacted by construction activity.
If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously Riverview Marketplace Commercial Project
Environmental Impact Report Findings
24 monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.
If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.
MM BIO-4 San Joaquin Kit Fox (SJKF) Pre-Construction Surveys. Pre-construction surveys to assess presence/absence of denning San Joaquin kit fox (SJKF) shall be conducted by the qualified biologist no less than 14 days and no more than 30 days prior to the commencement of any ground disturbance and/or construction activities or any Project activity likely to impact the SJKF. Surveys shall identify kit fox habitat features occurring on the project site (if any are determined to occur during the surveys) and evaluate use by SJKF and, if possible, assess the potential impacts to the kit fox by the proposed activity. If a natal/pupping den is discovered within the Project Site or within 200 feet of the project site boundary, the appropriate agencies (e.g., California Department of Fish and Wildlife, City of Bakersfield) shall be immediately notified and under no circumstances shall the den be disturbed or destroyed without prior authorization. If the preconstruction survey reveals an active natal pupping or new information, the Project applicant, construction contractor and biologist shall contact the appropriate agencies immediately to obtain the necessary take authorization/permit. Written results of the preconstruction surveys shall be submitted to the appropriate agencies within five (5) days after survey completion and prior to the start of ground disturbance and/or construction activities.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
25 MM BIO-5 SJKF Avoidance Buffer. Prior to the commencement of any ground disturbing activities, the Project applicant, construction contractor and project biologist shall implement no-disturbance buffers as described in the USFWS’ “Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance” (2011) (USFWS Protocol) around potentially suitable or known SJKF den sites identified during the pre-construction surveys outlined in Mitigation Measure BIO-4.
MM BIO-6 SJKF Take Authorization. If the no-disturbance buffers outlined in Mitigation Measures BIO-5 are not feasible, the project applicant and California Department of Fish and Wildlife (CDFW) shall discuss how to implement the project and avoid take. If take cannot be avoided, the Project applicant shall obtain take authorization from CDFW by obtaining an incidental take permit pursuant to Fish and Game Code section 2081, subdivision (b), in compliance with the California Endangered Species Act.
MM BIO-7 Crotch’s Bumble Bee (CBB) Habitat Assessment. Prior to the commencement of any ground-disturbing activities, the qualified biologist shall conduct an additional habitat assessment to determine if the project site and immediate surrounding vicinity contain habitat suitable to support CBB. Potential nesting sites, which include all small mammal nesting burrows, perennial bunch grasses, thatched annual grasses, brush piles, old bird nests, and hollow logs shall be documented as part of the assessment.
MM BIO-8 CBB Surveys. If potentially suitable habitat is identified during the habitat assessment conducted under Mitigation Measure BIO-7, a qualified biologist shall conduct focused surveys for CBB and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023).
MM BIO-9 CBB Avoidance. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, all small mammal burrows and thatched/bunch grasses shall be avoided by a minimum of 50 feet to avoid take and potentially significant impacts. If ground-disturbing activities occur during the overwintering period October through February), consultation with CDFW shall be conducted to discuss how to implement the proposed project’s construction-related activities and avoid take of the CBB. Any detection of CBB prior to or during project construction shall warrant discussions with CDFW to discuss how to avoid take.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
26 MM BIO-10 CBB Take Authorization. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, consultation with CDFW shall be warranted to discuss how to implement the proposed project and avoid take of the CBB. If take cannot be avoided, take authorization through the acquisition of an incidental take permit, pursuant to Fish and Game Code Section 2081, subdivision (b) is necessary to comply with the California Endangered Species Act.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Biological Resources (Sensitive Species, Local Policies).
Cultural Resources (Archaeological Resources and Human Remains) Although neither the record search nor the field visit conducted as part of the DEIR identified archeological resources, ground-disturbing activities have the potential to reveal buried deposits not observed on the surface. Additionally, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.
Therefore, the Project would implement Mitigation Measure (MM) CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. As such, with the implementation MM CUL-1, impacts to archaeological resources would be less than significant with mitigation incorporated. In the event that any human remains, or related resources are discovered, such resources would be treated in accordance with all applicable federal, state, and local regulations and guidelines for disclosure, recovery, relocation, and preservation, including State Health and Safety Code. If human remains are encountered during any project activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. As such, the Project would implement MM CUL-2, Inadvertent Discovery of Human Remains, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of this MM CUL-2, impacts to human remains would be less than significant with mitigation incorporated.
Mitigation Measures
MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned Riverview Marketplace Commercial Project
Environmental Impact Report Findings
27 off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.
MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Cultural Resources (Archaeological Resources and Human Remains).
Geology and Soils (Paleontological Resources)
The Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. According to the Palaeontologic Overview, the geologic units underlying the Project Area (one mile radius around the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered Riverview Marketplace Commercial Project
Environmental Impact Report Findings
28 to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits. While the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant. Excavation activity associated with the development of the project area is unlikely to be paleontologically sensitive, but caution during development should be observed. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement Mitigation Measure (MM) GEO-1, Paleontological Discovery and Monitoring, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, impacts would be less than significant.
Mitigation Measures
MM GEO-1 Paleontological Discovery and Monitoring. In the event paleontological resources, including fossil discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and techniques, who is knowledgeable in the geology of California (preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The qualified paleontologist shall be empowered to halt or divert ground disturbing activities.
If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the remainder of ground disturbance for the Project. Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted. Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.
Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, Riverview Marketplace Commercial Project
Environmental Impact Report Findings
29 analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for permanent curation and storage. At the conclusion of laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Geology and Soils (Paleontological Resources).
Transportation (Emergency Access)
Construction
Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles. Additionally, the Project would include the preparation and implementation of a Construction Traffic Management Plan as a Project Design Feature (PDF).
The Construction Traffic Management Plan would be submitted to the City for review and approval prior to construction and would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures; provisions for maintaining pedestrian, bicycle, transit, and vehicular access to adjacent properties to the maximum extent feasible; methods to avoid or minimize lane closures and sidewalk closures; advance notification procedures for nearby property owners and affected agencies; dust, debris, and mud track-out control measures affecting adjacent roadways; and procedures to maintain emergency vehicle access at all times during construction. Implementation of the Construction Traffic Management Plan would reduce the potential for temporary construction-related conflicts with emergency response by ensuring that access is maintained, construction traffic is managed in an orderly manner, and potentially disruptive activities are coordinated in advance with the City and emergency service providers.
Operation
The Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the City and Fire Department. BFD would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements, which would enhance emergency access to the Project Site. Furthermore, compliance with the California fire Code and local ordinances would ensure that the Project would not impair an adopted Riverview Marketplace Commercial Project
Environmental Impact Report Findings
30 emergency response plan. Through compliance with access requirements and, adequate emergency access to the Project Site would be provided. Project impacts concerning emergency access would be less than significant.
Project Design Features
TRAF-PDF-1: Construction Traffic Management Plan.
The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans, among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfield for approval.
The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent feasible so as to avoid worker trips during those peak hours. • Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained. • Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. on weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be performed on Sundays and holidays.
• Reduce the potential of trucks waiting for extended periods to load or unload. • Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during traffic rerouting and deliveries. • Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and loading/unloading on the Project Site. • Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclists, and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public. • Identification of a construction manager and provision of a telephone number for any inquiries or complaints from residents regarding construction activities. The telephone Riverview Marketplace Commercial Project
Environmental Impact Report Findings
31 number shall be posted at the site, readily visible to any interested party during site preparation, grading, and construction.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Transportation (Emergency Access).
Tribal Cultural Resources
Although no Tribal Cultural Resources (TCRs) were identified in the Project Site, ground disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2 discussed above. With implementation of MM CUL-1 and MM CUL-2, impacts to TCRs would remain less than significant with mitigation incorporated.
VII. SIGNIFICANT AND UNAVOIDABLE IMPACTS
The EIR identified the following impacts that would remain significant and unavoidable even after implementation of all feasible mitigation measures. For these impacts, the City makes the finding pursuant to PRC Section 21081(a)(1) that changes or alterations have been required in, or incorporated into, the Project which mitigate the significant effects, and the finding pursuant to PRC Section 21081(a)(3) that specific economic, legal, social, technological, or other considerations make infeasible additional mitigation measures or project alternatives identified in the EIR.
A. Greenhouse Gases (GHG)
Operation of the Project would generate GHG emissions from vehicle trips, water demand, wastewater and solid waste generation, area sources (e.g., consumer cleaning products), energy usage (i.e., natural gas and electricity), and refrigerants. The Project’s primary source of project-related emissions would be from mobile-source emissions generated from Project vehicle trips (e.g., employees and patrons). The next largest sources of emissions would be from energy usage, followed by the solid waste and water sectors. Overall, development of the Project would generate annual operational phase GHG emissions of 16,027 MTCO2e per year under full buildout year conditions and would not achieve net zero GHG emissions Implementation of MM GHG-1 and GHG-3 would contribute to supporting and encouraging use of electricity instead of natural gas or other liquid fuels, which would minimize on-site generation of GHG emissions. Implementation of MM GHG-1 and GHG-3 would reduce project-related GHG emissions by 102 MTCO2e/yr. However, these two mitigation measures would not reduce Project-related emissions to achieve net zero. Overall, the other mitigation measures would help contribute to reducing operation-related Project GHG emissions to the extent feasible.
For example, MM GHG-2 would contribute to increasing use of carbon-free renewable electricity and supplement the on-site renewable electricity generated by the proposed on-site PV systems.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
32 Additionally, MM GHG-5 and GHG-6 would result in active and public transit facility improvements and promote active transit and public transit use, which would contribute to reducing passenger VMT. Furthermore, MM GHG-7 would result in increased EV charging infrastructure improvements and support use and adoption of EVs. Overall, although implementation of reduction measures would reduce Project-related GHG emissions to the extent feasible, operation of the proposed Project is still anticipated to generate GHG emissions and would not achieve the net zero threshold. Thus, Project-related GHG emissions would have a substantial cumulative contribution to GHG emissions impacts. Impacts would be significant and unavoidable.
Per the VMT analysis prepared, the Project has been designed to incorporate feasible VMT reducing strategies. The Project would include end-of-trip bicycle facilities such as bicycle parking and lockers. In addition, it also includes bicycle facility improvements as it proposes a new bicycle lane along Rosedale Highway, which would extend an existing facility and improve overall bicycle network connectivity. Furthermore, the Project includes pedestrian network improvements such as new sidewalks along its frontages. Aside from these Project-related design features, future commercial tenants of the proposed Project would be subject to the SJVAPCD Rule 9410 eTRIP rule. These Project improvements in addition to the SJVPACD eTRIP rule would contribute to reducing Project-generated VMT to the extent feasible.
Incorporation of MM GHG-5 and GHG-6, which would result in improvements for up to two bus stops and installation of an onsite end-of-trip shower facility, would also contribute to reducing project-generated VMT to the extent feasible by supporting public transit and bicycle use.
However, overall, the proposed Project would continue to be inconsistent with the Kern COG 2022 RTP/SCS. Impacts would be significant and unavoidable. No other feasible mitigation is available.
Mitigation Measures
MM GHG-1 The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.
MM GHG-2 Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such Riverview Marketplace Commercial Project
Environmental Impact Report Findings
33 plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime, but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.
MM GHG-3 All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.
MM GHG-4 Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.
Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.
MM GHG-5 The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.
MM GHG-6 The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
34 MM GHG-7 The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a significant and unavoidable impact with mitigation incorporated with respect to GHG.
B. Transportation (Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b))
The Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies that are consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with California Air Pollution Control Officers Association (CAPCOA) methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the Project’s location and operational characteristics. However, the reduction in VMT from the design features would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant impact. No other feasible mitigation is available.
Finding: The City finds that, based on substantial evidence in the record, the Project would result in a significant and unavoidable impact with VMT.
VIII. ALTERNATIVES
CEQA requires an EIR to describe a range of reasonable alternatives to the Project that would feasibly attain most of the basic objectives while reducing or avoiding significant impacts (CEQA Guidelines Section 15126.6). The analysis need not consider every conceivable alternative, but must consider a reasonable range. The lead agency may reject alternatives as infeasible.
A. Alternative 1: No Build/No Project Alternative
Impact Summary: Pursuant to Section 15126.6(e)(3)(B) of the CEQA Guidelines, Alternative 1, the “No Project” Alternative, represents the circumstance under which the Project does not proceed. Under Alternative 1, it is assumed that the existing state of the Project Site would remain as-is and no new development would be implemented. As discussed in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six- Riverview Marketplace Commercial Project
Environmental Impact Report Findings
35 feet tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
Alternative 1 would avoid the Project’s significant and unavoidable impacts to Greenhouse Gas Emissions (GHG) and Transportation. Alternative 1 would also result in no impact in all other environmental topical areas analyzed in the Draft EIR. As the No Build/No Project alternative would not include a development program, the Alternative 1 would not meet any of the objectives of the Project.
Finding: The No Project Alternative is rejected as infeasible because it would not meet the underlying purpose of the Project or any of the Project’s basic objectives.
B. Alternative 2: Reduced Project Alternative
Impact Summary: The Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses. Accordingly, the total commercial square footage would be reduced from 405,531 square feet to approximately 304,148 square feet and the total number of dual sided fuel pumps would be reduced from 20 to 15. The buildings would be constructed in the same general arrangement as currently proposed and set forth in the site plan, but with a smaller footprint. The areas not covered by buildings would be used for surface parking for passenger vehicles and the site’s vehicular access would be the same general arrangement as currently proposed and set forth in the site plan. The development characteristics of this Reduced Project Alternative are assumed to be similar to those of the Project, including excavation and earth movement.
As the Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses, less development would occur and some of the environmental impacts would be reduced.
However, this Alternative would not eliminate the Project’s significant and unavoidable impacts.
With less development, the Project would meet the following objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
36 • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.
However, with reduced development, Alternative 2 would not meet the following objective related to employment and job growth to the same extent as the Project:
• Creation of new and future employment opportunities.
Finding: Alternative 2 is rejected as infeasible because it would not avoid significant and unavoidable impacts, nor would it meet the Project’s objective related to employment and job growth to the same extent as the Project.
C. Alternative 3: Existing General Plan/Zoning Alternative Under Alternative 3, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, this alternative assumes the Project Site would be developed with a by-right use and no General Plan amendment or zone change is necessary. The Project Site’s current Public Facilities (P) designation, as well as the prohibitions in the deed restriction and restrictive covenant that encumber the property, significantly limit the types of uses permitted on the Project Site. Based on the site’s Public Facilities designation, the allowed uses are limited to the following:
Public Facilities (P): includes government buildings, hospitals, public utilities, cemeteries, sewage treatment plants, waste disposal sites and other publicly owned facilities.
For purposes of the analysis, the maximum allowable development of the Project Site is in accordance with the MBGP. Based thereon, Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices. All existing on-site uses, except the transmission facilities, would be removed to accommodate this alternative.
Under Alternative 3, the Project Site would be developed with approximately 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space, a 58,000 square foot laydown with detention basin, and a 5,300 square foot fueling facility. The alternative will also include 335,000 square feet of employee parking.1
1 This alternative project was derived and scaled based on input from the City’s Public Works Department of desired improvements on a new 30-acre public works yard.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
37 Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.
However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activitiesto the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.
Therefore, the future municipal maintenance and storage yard uses on the Project Site would not meet the following Project objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby. • New native and drought tolerant landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.
Finding: Alternative 3 is rejected as infeasible because it would not meet several of the Project’s objectives related to employment and job growth, revitalization, and activity and aesthetic improvements to the same extent as the Project.
E. Alternative Rejected as Infeasible
Consideration was given to developing the Project, as proposed, on an alternative site within the City of Bakersfield. In considering this alternative, the following challenges were identified:
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
38 • The selection of any alternative site would have the same potentially significant impacts as the current Project site.
• Due to the Project Site’s unique characteristics, finding a comparable infill site of equal size is unlikely.
• An alternative site that is properly zoned and of equal size is not likely to meet the critical project objective of promoting favorable infill development. • An alternative site of adequate size would likely be outside of an established urban area, resulting in potentially increased impacts to traffic and greenhouse gas emissions. • The Applicant does not have ownership control of any alternative sites, rendering this alternative infeasible.
For these reasons, analysis of an alternative site was eliminated from further consideration in the EIR.
F. Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.
Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree
Of the alternatives analyzed in this Draft EIR, Alternative 1 would be considered the environmentally superior alternative because it would not involve new development and assumes that the Project Site would remain vacant under existing conditions. Although Alternative 1 would not meet any of the Project objectives, it would avoid all of the Project’s potentially significant impacts and significant and unavoidable impacts and would have reduced impacts compared to the Project. However, as Alternative 1 is a “no project” alternative which is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives
Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.
However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activitiesto the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site Riverview Marketplace Commercial Project
Environmental Impact Report Findings
39 to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
40 IX. SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES
Pursuant to CEQA Guidelines Section 15126.2(d), an EIR must identify any significant irreversible environmental changes that would be caused by the proposed project should it be implemented.
The following significant irreversible environmental changes would result from implementation of the Project:
As stated in Chapter 6, Other CEQA Considerations, of the Draft EIR, the Project would necessarily consume limited, slowly renewable, and non-renewable resources that could contribute to irreversible environmental changes. This consumption would occur during construction of the Project and would continue throughout its operational lifetime. The development of the Project would require a commitment of resources that would include: (1) building materials, (2) fuel and operational materials/resources, and (3) the transportation of goods and people to and from the Project Site.
With regard to building materials and solid waste, construction of the Project would require consumption of resources including certain types of lumber and other forest products, aggregate materials used in concrete and asphalt, metals, and petrochemical construction materials. The Project Site is currently vacant and therefore, no solid waste is currently being generated at the site. The Project would be served by the Metropolitan Sanitary Landfill/Bena Landfill, operated by the Kern County Public Works Department. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals. The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. During operation, using CalRecycle’s solid waste generation factor for commercial uses of approximately 13 pounds per 1,000 square foot per day, the Project’s 405,531 square feet of building area would generate approximately 5,272 pounds/day (2.6 tons/day), or 949 tons per year of solid waste. Consistent with State mandates (AB 939, AB 341, AB 1826, and SB 1383) and City programs, at least 50 percent of this material would be diverted through recycling and organics collection, resulting in an estimated disposal volume of 474 tons per year (1.3 tons/day) (Draft EIR, Section 4.18, Utilities and Service Systems, pages 4.18-15 through 4.18-17).
With regard to water, the Project is expected to increase water demand by 148,925 gallons per day. The Project’s contribution to the increase in water demand would fall within the available and projected water supplies reported in the City’s 2020 Urban Water Management Plan for the City for 2020 and the City’s projected 2040 water supply. Therefore, the Project would not result in a significant impact related to water supply.
With regard to energy consumption, during construction, fossil fuels would be consumed by on-road trucks and off-road construction equipment. Construction of the Project would not require electricity to power most construction equipment. The majority of construction equipment would be gasoline or diesel-powered. It is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Construction vehicles and Riverview Marketplace Commercial Project
Environmental Impact Report Findings
41 equipment would comply with CARB regulations and California emission standards. In addition, there are no unusual Project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities or equipment that would not conform to current emissions standards (and related fuel efficiencies).
During operation, would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting. Operation of the Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop solar photovoltaic (PV) systems and battery storage systems. Therefore, the Project would not cause wasteful, inefficient, and unnecessary consumption of energy (Draft EIR, Chapter 6, Other CEQA Considerations, pages 6- 1 through 6-3).
With regard to environmental hazards, construction of the Project would involve the use of hazardous substances in the form of paint, adhesives, solvents, and other substances typically used in building construction. However, all materials would be used, stored, and disposed of in accordance with applicable laws and regulations and manufacturers’ instructions. During operation, the use of hazardous materials would involve employing common maintenance and janitorial supplies, such as cleaners and solvents, paints and thinners for site maintenance, and other common chemicals. The limited quantities and nature of chemicals used by the Project for the generally commercial uses would not be considered significant. However, the proposed gas station and car wash would utilize hazardous materials regularly during operations. Gas station operations include the use of gasoline and diesel fuel, which are stored in underground storage tanks (USTs). During refueling, VOCs can be released as vapors, including benzene, toluene, ethyl-benzene, xylenes, and naphthalene. Often, fuel additives are also utilized at gas stations.
Additionally, carbon monoxide and formaldehyde are produced by vehicles at the station.
Propane tanks (exchange cages), motor oil, lubricants, battery fluids, and hydraulic fluids can also be released due to the nature of regular uses by automobiles. However, gas stations are heavily regulated by hazardous materials laws focusing on leak prevention, vapor recovery, and fire safety, overseen primarily by the CUPA. Operations of the car wash would be required to comply with hazardous material regulations under federal, state, and local laws, focusing on water protection, chemical handling, and waste disposal. The Project would be required to comply with the RCRA, which mandates "cradle-to-grave" control over hazardous waste, including oil, sludge, and certain soaps. Additionally, the OHSA Hazard Communication Standard (29 CFR Section 1910.1200) requires proper labelling, handling procedures, and worker training for handling chemicals. And finally, operations of the car wash would be required to comply with CCR Title 22, which requires secondary containment for chemicals and specific disposal protocols for car wash sludge. The use of these materials would be in accordance with the manufacturers’ specifications for use, storage, and disposal of such products which have been formulated to avoid substantial Riverview Marketplace Commercial Project
Environmental Impact Report Findings
42 exposure hazards. Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce the potential to release contaminants. Therefore, it is not expected that the Project would cause irreversible damage from environmental accidents associated with the use of typical, potentially hazardous materials (Draft EIR, Section 4.9, Hazards and Hazardous Materials, pages 4.9-12 through 4.9-13).
Based on the above, while Project construction and operation would require the irreversible commitment of limited, slowly renewable, and non-renewable resources, which would limit the availability of these resources for future generations, the consumption of such resources would not be considered substantial and would be consistent with regional and local growth forecasts and development goals for the area. The loss of such resources would not be highly accelerated when compared to existing conditions, and such resources would not be used in a wasteful manner. Therefore, although irreversible environmental changes would result from the Project, such changes are concluded to be less than significant, with the exception of the significant and unavoidable impact to GHG and VMT, and the limited use of nonrenewable resources that would be required by Project construction and operation is justified.
X. GROWTH INDUCING IMPACTS
CEQA Guidelines Section 15126.2(e) requires an EIR to discuss the ways a Project could foster economic or population growth or the construction of additional housing, directly or indirectly, in the surrounding environment. Growth-inducing impacts include the removal of obstacles to population growth (e.g., the expansion of a wastewater treatment plant allowing more development in a service area) and the development and construction of new service facilities that could significantly affect the environment individually or cumulatively. In addition, pursuant to CEQA, growth must not be assumed as beneficial, detrimental, or of little significance to the environment.
The Project Site is located in the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services. The Project Site is surrounded by existing commercial uses to the north, west, and east.
As discussed in Section 4.14, Population and Housing, of the Draft EIR, the Project proposes the development of a commercial retail center and does not include a residential component that would result in residents and population within the City. As such, the Project would not directly induce population growth.
The Project would not include components such as the extension of roads or existing infrastructure that would result in the indirect population growth within the City. It is anticipated Riverview Marketplace Commercial Project
Environmental Impact Report Findings
43 that construction workers and future employees of the Project would reside within the City and surrounding area, and commute to work. Although the operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Therefore, the Project would not induce substantial unplanned population growth and would not eliminate impediments to growth. Consequently, the Project would not foster growth inducing impacts.
XI. STATEMENT OF OVERRIDING CONSIDERATIONS
The EIR identifies unavoidable significant impacts that would result from implementation of the Project. PRC Section 21081 and CEQA Guidelines Section 15093(b) provide that when a decision of a public agency allows the occurrence of significant impacts that are identified in the EIR, but are not at least substantially mitigated to an insignificant level or eliminated, the lead agency must state in writing the reasons to support its action based on the EIR and/or other information in the record. The City is required to balance, as applicable, the economic, legal, social, technological, or other benefits of the proposed Project, including regionwide or statewide environmental benefits, against its unavoidable environmental risks when determining whether to approve the Project. The CEQA Guidelines require, pursuant to CEQA Guidelines Section 15093(b), that the decision-maker adopt a Statement of Overriding Considerations at the time of approval of a project if it finds that significant adverse environmental effects have been identified in the EIR that cannot be substantially mitigated to an insignificant level or be eliminated. These findings and the Statement of Overriding Considerations are based on the documents and materials that constitute the record of proceedings, including, but not limited to, the Final EIR and all technical appendices attached thereto.
Based on the analysis provided in Section IV, Environmental Impact Analysis, of the Draft EIR, implementation of the Project would result in significant impacts that cannot be feasibly mitigated with respect to: GHG emissions and VMT.
Accordingly, the City adopts the following Statement of Overriding Considerations. The City recognizes that significant and unavoidable impacts would result from implementation of the Project. Having (i) adopted all feasible mitigation measures, including Mitigation Measures GHG-1 through GHG-7, (ii) rejected as infeasible the alternatives to the Project discussed in Section VIII of these Findings, (iii) recognized all significant, unavoidable impacts, and (iv) balanced the benefits of the Project against the Project’s significant and unavoidable impacts, the City hereby finds that each of the Project’s benefits, as listed below, outweigh and override the significant unavoidable impacts relating to: GHG emissions and VMT.
The below stated reasons summarize the benefits, goals and objectives of the Project, and provide the detailed rationale for the benefits of the Project. These overriding considerations of Riverview Marketplace Commercial Project
Environmental Impact Report Findings
44 economic, social, aesthetic, and environmental benefits for the Project justify adoption of the Project and certification of the completed EIR. Each of the listed Project benefits set forth in this Statement of Overriding Considerations provides a separate and independent ground for the City’s decision to approve the Project despite the Project’s identified significant and unavoidable environmental impacts. Each of the following overriding considerations separately and independently (i) outweighs the adverse environmental impacts of the Project, and (ii) justifies adoption of the Project and certification of the completed EIR. In particular, achieving the underlying purpose for the Project would be sufficient to override the significant environmental impacts of the Project.
1. The Project Would Create Jobs and Enhance City Revenues: The Project would advance the City’s goals to provide employment opportunities, grow the City’s economic base, and increase the City’s revenues. Project construction would generate temporary construction employment for the local workforce. During operation, the Project would require approximately 969 employment opportunities for area residents. The new commercial uses would generate sales tax revenue and property tax revenue for the City.
2. The Project Would Revitalize an Underutilized Site: The Project would transform an underutilized site into an active infill commercial center that would create economic, retail, and service opportunities in an area served with existing infrastructure and public services. The Project would provide a modern commercial development with a variety of tenants that responds to the existing and future needs and demands of Bakersfield residents. Careful and judicious use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road Frontage and Rosedale Highway frontages would run a “dry creek” aesthetic feature composed of decorative cobbles and decomposed granite and crushed rocks. The Project would feature 325,120 square feet of new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian-oriented experience, and provide shade.
3. Sustainable Development
The Project would be an infill development that promotes the sustainable principles of smart growth. Compliance with state laws regarding water and energy conservation, including Title 24, would also result in increased efficiency and sustainability. Landscaping is anticipated to be native and drought-tolerant and would comply with the Model Water Efficient Landscape Ordinance (MWELO) per Section 17.61.060, Landscape Plan Requirements of the City of Bakersfield Municipal Code.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
45 2. Bicycle, Pedestrian, and Roadway Improvements: The Project would include several pedestrian and bicycle improvements. The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers, new sidewalks along its frontages, and a new bicycle lane along Rosedale Highway, which extends the existing facilities in the future.
The Project would include off-site improvements, including modification to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane and roadway striping).
For the existing signalized intersection of Rosedale Highway and Northwest Promenade, which is the street that provides vehicular access to the commercial retail center north of the Project Site, no improvements or modifications to the traffic signal poles/structures would occur. However, a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) would be modified to provide a dedicated left-turn lane for westbound traffic entering the Project Site at the signalized intersection. Other roadway improvements at this intersection would include striping.
The City finds that each of the Project benefits set forth above constitutes a separate and independent basis for overriding the significant and unavoidable environmental impact of the Project, which cannot be feasibly mitigated to less than significant. The City further finds that even if not every benefit identified above is achieved, each individual benefit is sufficient by itself to outweigh the significant and unavoidable impact. After balancing the specific economic, social, legal, and other considerable benefits of the proposed project, the City finds that the remaining significant and unavoidable environmental effects are acceptable due to the factors described in the Statement of Overriding Considerations above.
XII. GENERAL FINDINGS
• The City finds that the EIR for the Riverview Marketplace Project (General Plan Amendment No. 23-0001, Site Plan Review No. 22-0223, and Tentative Tract Map No. 7526; SCH No. 2025101507) was prepared in compliance with CEQA and the CEQA Guidelines. The EIR adequately addresses the environmental effects of the Project. • The City finds that it has independently reviewed and analyzed the EIR and that the EIR reflects the City’s independent judgment.
• The City finds that the responses to comments in the Final EIR adequately address the comments received during the public review period. To the extent that comments raised new environmental issues, those issues were addressed in the Final EIR. • The City finds that the Mitigation Monitoring Program (MMP) has been adopted for the Project. The MMP includes all mitigation measures and project design features identified in the EIR and establishes a monitoring program to ensure implementation and compliance.
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
46 • The City finds that the custodian of documents and other materials that constitute the record of proceedings upon which the City’s decision is based is the Development Services Department – Planning Division, 1715 Chester Avenue, 2nd Floor, Bakersfield, California 93301.
• The City finds that the EIR provides adequate, good faith disclosure of environmental impacts as required by CEQA, including potentially significant impacts that cannot be feasibly mitigated to a less than significant level.
• The City hereby adopts these Findings in their entirety. To the extent that these Findings conclude that any proposed mitigation measure is feasible, the City hereby adopts such mitigation measures. Each of the mitigation measures adopted is enforceable through the MMP.
ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Deferred Business TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: October 30, 2026
SUBJECT: Purchase of 15-Gallon and 24-Inch Box Trees for the Recreation and Parks Department.
Accept bid for the purchase of 15-gallon and 24-inch box trees from Zack’s Big Trees & Nursery in the amount of $274,413.75 for the Recreation and Parks Department.
RECOMMENDATION:
Staff recommends acceptance of the bids.
BACKGROUND:
Bids were solicited for 15-gallon and 24-inch box trees to support the City’s ongoing drought-related replanting efforts. The purchase will provide the City with necessary replacement plant material to replace trees lost as a result of drought conditions and to restore and maintain the appearance and integrity of City streetscapes.
Five bids were received in response to the solicitation. Bidders were requested to provide unit pricing for the specified tree varieties and estimated quantities identified in the Bid Form. The solicitation expressly states that the estimated quantities are provided solely as a basis for comparison of bids and that the City reserves the right to increase or decrease quantities. The solicitation further provides that, unless a bidder gives notice of an “all-or-none” bid, the City may accept any individual item or category/group of items quoted or award a contract based on the total bid. The solicitation also provides that bid prices shall remain open and valid, subject to acceptance, for ninety (90) days after the bid closing date.
Summary of all bids received is below:
BIDDER TOTAL BID AMOUNT PARTIAL BID
AMOUNT
RECOMMENDED
AWARD
Zack’s Big Trees & Nursery
Bakersfield, CA N/A $274,413.75 $274,413.75
Green World Nurseries
Escondido, CA $354,951.75 N/A $0.00
Maranatha Gardening &
Landscaping Inc.
Bakersfield, CA
$440,577.50 N/A $0.00
Bolles Nursery Inc.
Bakersfield, CA $465,042.00 N/A $0.00
West Coast Arborists
Anaheim, CA $559,923.13 N/A $0.00
Based on the submitted unit prices and estimated quantities, Zack’s Big Trees & Nursery was the lowest responsive and responsible bidder for the bid line items for which the supplier submitted pricing. Zack’s Big Trees & Nursery did not submit a bid for Line No. 13, Interior Live Oak (Quercus wislizeni) in 15-gallon containers. Therefore, Line No. 13 is not included in the recommended award.
Staff find Zack’s Big Trees & Nursery’s bid to be acceptable and recommend a partial award in the amount of $274,413.75 for the bid line items for which it submitted the lowest responsive and responsible bid, excluding Line No. 13. No award is recommended for Line No. 13 at this time. This recommendation is consistent with the solicitation provision allowing the City to accept individual items or categories/groups of items quoted by a bidder. A full bid tabulation is attached for review.
FISCAL IMPACT:
Funds are available within the Recreation and Parks FY 2026-27 Operating Budget within the General Fund for this purchase
COUNCIL GOAL:
Reliable Infrastructure
ATTACHMENTS:
Bid Tabulation
Items PRODUCT DESCRIPTION QTY UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE UNIT PRICE EXTENDED PRICE 1 Chinese Pistache (Pistacia chenensis) in 24" box
containers 160 187.50 30,000.00 225.00 36,000.00 300.00 48,000.00 300.00 48,000.00 350.00 56,000.00 2 Crape Myrtle (Lagerstroemia indica) in 24" box
containers 50 206.25 10,312.50 195.00 9,750.00 315.00 15,750.00 330.00 16,500.00 350.00 17,500.00 3 Stone Pine (Pinus pinea) in 24" box containers 10 312.50 3,125.00 225.00 2,250.00 350.00 3,500.00 500.00 5,000.00 350.00 3,500.00 4 Interior Live Oak (Querces wislizeni) in 24" box
containers 35 243.75 8,531.25 295.00 10,325.00 345.00 12,075.00 390.00 13,650.00 350.00 12,250.00 5 Hackberry (Celtis occidentalis) in 24" box
containers 60 231.25 13,875.00 325.00 19,500.00 335.00 20,100.00 370.00 22,200.00 350.00 21,000.00 6 Chinese Elm (Ulmus parvifolia) in 24" nox
containers 65 206.25 13,406.25 225.00 14,625.00 315.00 20,475.00 330.00 21,450.00 350.00 22,750.00 7 Valley Oak (Quercus lobata) in 24" box tree
containers 100 231.25 23,125.00 375.00 37,500.00 335.00 33,500.00 370.00 37,000.00 350.00 35,000.00 8 Western Sycamore (Platanus racemose) in 24"
box tree containers 60 206.25 12,375.00 185.00 11,100.00 315.00 18,900.00 330.00 19,800.00 350.00 21,000.00 9 Chinese Pistache (Pistacia chenensis) in 15-
gallon containers 400 62.50 25,000.00 59.00 23,600.00 100.00 40,000.00 100.00 40,000.00 150.00 60,000.00 10 Crape Myrtle (Lagerstroemia indica) in 15-gallon
containers 450 68.75 30,937.50 69.00 31,050.00 105.00 47,250.00 110.00 49,500.00 150.00 67,500.00 11 Oklahoma Redbud (Cercis canadensis) in 15-
gallon containers 100 87.50 8,750.00 105.00 10,500.00 120.00 12,000.00 140.00 14,000.00 150.00 15,000.00 12 Stone Pine (Pinus pinea) in 15-gallon containers 100 75.00 7,500.00 85.00 8,500.00 110.00 11,000.00 120.00 12,000.00 150.00 15,000.00 13 Interior Live Oak (Querces wislizeni) in 15-gallon
containers 200 NO BID NO BID 105.00 21,000.00 126.00 25,200.00 120.00 24,000.00 175.00 35,000.00 14 Coast Live Oak (Quercus agrifolia) in 15-gallon
containers 250 75.00 18,750.00 79.00 19,750.00 110.00 27,500.00 120.00 30,000.00 145.00 36,250.00 15 Hackberry (Celtis occidentalis) in 15-gallon
containers 100 68.75 6,875.00 165.00 16,500.00 105.00 10,500.00 110.00 11,000.00 150.00 15,000.00 16 Chinese Elm (Ulmus parvifolia) in 15-gallon
containers 100 68.75 6,875.00 69.00 6,900.00 110.00 11,000.00 110.00 11,000.00 150.00 15,000.00 17 Canary Island Pine (Pinus canariensis) in 15-
gallon containers 100 68.75 6,875.00 69.00 6,900.00 110.00 11,000.00 110.00 11,000.00 145.00 14,500.00 18 Valley Oak (Quercus lobata) in 15-gallon
containers 150 81.25 12,187.50 125.00 18,750.00 115.00 17,250.00 130.00 19,500.00 150.00 22,500.00 19 Western Sycamore (Platanus racemose) in 15-
gallon containers 100 68.75 6,875.00 69.00 6,900.00 105.00 10,500.00 110.00 11,000.00 150.00 15,000.00 20 California Bay Laurel (Laurus nobilis) in 15-gallon
containers 100 81.25 8,125.00 165.00 16,500.00 115.00 11,500.00 130.00 13,000.00 175.00 17,500.00 Subtotal 253,500.00 327,900.00 407,000.00 429,600.00 517,250.00 CA SALES TAX 8.25% 20,913.75 27,051.75 33,577.50 35,442.00 42,673.13 TOTAL $274,413.75 $354,951.75 $440,577.50 $465,042.00 $559,923.13 RECOMMENDED AWARD: Zack’s Big Trees & Nursery, the lowest responsive and responsible bidder, is recommended for award of all bid lines for which it submitted a bid, excluding Line No. 13, in the amount of $274,413.75, including sales tax. No award is recommended for Line No. 13 at this time.
WEST COAST ARBORISTS
Anaheim, CA
15-GALLON AND 24 INCH BOX TREES
26-27-09
ZACK'S BIG TRESS & NURSERY
Bakersfield, CA
GREEN WORLD NURSERIES
Escondido, CA
MARANATHA GARDENING &
LANDSCAPING INC
Bakersfield, CA
BOLLES NURSERY INC
Bakersfield, CA
2026-27 Tree
Spending Plan
Rick Anthony
Thank you
ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: NEW BUSINESS TO: Honorable Mayor and City Council
FROM: Julie Drimakis, City Clerk
DATE: October 7, 2026
SUBJECT: 2027 Regular City Council Meetings, Department Budget Presentations and Hearings Calendar:
Resolution setting dates of the Regular City Council Meetings, Department Budget Presentations and Budget Hearing for January through December 2027.
RECOMMENDATION:
Staff recommends Council adopt the resolution.
BACKGROUND:
This Resolution sets forth the regular City Council Meetings, Department Budget Presentations and Budget Hearing for 2027. Regular meetings will be held in the Council Chambers and will begin at 3:30 p.m. and 5:15 p.m.
Two Monday noon budget workshops are scheduled for May 3, 2027, and May 17, 2027. The required budget hearing is scheduled for June 9, 2027, at 5:15 p.m., or as soon thereafter as the matter may be heard and adoption of the Fiscal Year 27-28 budget is set for June 23, 2027. National holidays, spring break, conflicting board meetings, League of California Cities Conferences and budget deadlines were taken into consideration in preparing the calendar.
FISCAL IMPACT:
The action to approve the 2027 regular meeting calendar is included in the Fiscal Year 2027-28 budget and will have no impact on City General Fund.
COUNCIL GOAL:
Innovative and Efficient City Government
ATTACHMENTS:
1. Resolution
2. Exhibit A – 2027 City Council Meeting Calendar
RESOLUTION NO. _______________________
A RESOLUTION OF THE COUNCIL OF THE CITY OF
BAKERSFIELD SETTING THE DATES FOR REGULAR MEETINGS
OF THE CITY COUNCIL, DEPARTMENT BUDGET
PRESENTATIONS AND BUDGET HEARING FOR JANUARY
THROUGH DECEMBER 2027.
WHEREAS, pursuant to Section 2.04.010 of the Municipal Code of the City of Bakersfield, the Council may, from time to time, by resolution, change the meetings to be held during any specified period of time.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield that the Regular City Council Meetings will be held on Wednesdays in the Council Chambers at 3:30 P.M. and 5:15 P.M., Department Budget Presentations will be held on Mondays at 12:00 P.M., or as soon thereafter, and Budget Hearings will be held at 5:15 P.M., or as soon thereafter, as shown below and on Exhibit “A” attached hereto:
REGULAR CITY COUNCIL MEETINGS
(Wednesdays at 3:30 p.m. and 5:15 p.m.)
January 6, 2027 April 21, 2027 August 25, 2027
January 20, 2027 May 12, 2027 September 15, 2027
February 10, 2027 May 26, 2027 October 6, 2027
February 24, 2027 June 9, 2027 October 20, 2027
March 10, 2027 June 23, 2027 November 3, 2027
March 24, 2027 July 14, 2027 November 17, 2027
April 7, 2027 August 4, 2027 December 15, 2027
DEPARTMENT BUDGET PRESENTATIONS
(Mondays at 12:00 noon)
May 3, 2027, and May 17, 2027
BUDGET HEARING AND ADOPTION
June 9, 2027, and June 23, 2027 (Adoption)
---------o0o----------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on by the following vote:
AYES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER: _______________________________________________________________ ABSTAIN: COUNCILMEMBER: _______________________________________________________________ ABSENT: COUNCILMEMBER: _______________________________________________________________ _ ________________________________________
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED
_________________________
KAREN GOH
Mayor of the City of Bakersfield
APPROVED as to form
VIRGINIA GENNARO
City Attorney
By: ________________________
Exhibit A
REGULAR MEETINGS DEPARTMENT BUDGET WORKSHOPS
BEGIN @ 3:30 P.M. & 5:15 P.M. @ 12:00 NOON
(Budget Hearing on 6/9, and Adoption on 6/23)
Holidays - City Hall Closed
MARCH
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 1 2 3 4 5 6
3 4 5 6 7 8 9 7 8 9 10 11 12 13 7 8 9 10 11 12 13
10 11 12 13 14 15 16 14 15 16 17 18 19 20 14 15 16 17 18 19 20 17 18 19 20 21 22 23 21 22 23 24 25 26 27 21 22 23 24 25 26 27 24 25 26 27 28 29 30 28 28 29 30 31
31 APRIL MAY JUNE
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 3 1 1 2 3 4 5
4 5 6 7 8 9 10 2 3 4 5 6 7 8 6 7 8 9 10 11 12
11 12 13 14 15 16 17 9 10 11 12 13 14 15 13 14 15 16 17 18 19 18 19 20 21 22 23 24 16 17 18 19 20 21 22 20 21 22 23 24 25 26 25 26 27 28 29 30 23 24 25 26 27 28 29 27 28 29 30
30 31
JULY AUGUST SEPTEMBER
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 3 1 2 3 4 5 6 7 1 2 3 4
4 5 6 7 8 9 10 8 9 10 11 12 13 14 5 6 7 8 9 10 11
11 12 13 14 15 16 17 15 16 17 18 19 20 21 12 13 14 15 16 17 18 18 19 20 21 22 23 24 22 23 24 25 26 27 28 19 20 21 22 23 24 25 25 26 27 28 29 30 31 29 30 31 26 27 28 29 30
OCTOBER NOVEMBER DECEMBER
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 1 2 3 4
3 4 5 6 7 8 9 7 8 9 10 11 12 13 5 6 7 8 9 10 11
10 11 12 13 14 15 16 14 15 16 17 18 19 20 12 13 14 15 16 17 18 17 18 19 20 21 22 23 21 22 23 24 25 26 27 19 20 21 22 23 24 25 24 25 26 27 28 29 30 28 29 30 26 27 28 29 30 31
31 "EXHIBIT A"
JANUARY FEBRUARY
SCHEDULED MEETINGS
BAKERSFIELD CITY COUNCIL
JANUARY 2027 THROUGH DECEMBER 2027
Adopted Resolution No.