Cities Index.
Minutes, regular meeting, second session

Bakersfield City Council
November 4, 2026

Document
Minutes, regular meeting, second session
Meeting
November 4, 2026
Body
Bakersfield City Council
Pages
223
Original file
413.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

CONTRACTOR. CONTRACTOR agrees that it will not cause retention to be withheld from subcontractors working under this Agreement which are subject to the provisions of 49 CFR Part 26.29. For projects, or any severable parts of a project under Federal law, which do not fall under 49 CFR Part 26.29, CITY shall retain ten percent from payments to CONTRACTOR, unless otherwise prohibited by law.

2.3. Prompt Progress Payment to Subcontractor. A prime contractor or subcontractor shall pay any subcontractor not later than (7) days of receipt of each progress payment in accordance with the provision in Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. The (7) days is applicable unless a longer period is agreed to in writing. Any delay or postponement of payment over 30 days may take place only for good cause and with the agency's prior written approval. Any violation of Section 7108.5 shall subject the violating contractor or subcontractor to the penalties, sanction and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor.

The Contractor and Subcontractors on federally funded projects shall incorporate the (7) day prompt progress payments clause in all of their agreements, contracts, subcontracts, and sub-agreements.

In the event of noncompliance in regards to this requirement, CONTRACTOR will be required to correct the noncompliance. CITY will withhold payment for subcontracted work involved with the noncompliance from progress payments due, or to become due, until correction is made. Failure to comply may result in termination of this Agreement. (if Project Federally Funded)

3. SCHEDULING. When required by CITY in contract bid documents, or upon reasonable notice, CONTRACTOR shall supply CITY with scheduling documents showing all information in a form requested by CITY.

CONTRACTOR's scheduling personnel shall have experience in and be knowledgeable in scheduling. CITY may require CONTRACTOR to supply the schedule on programs named by CITY (Microsoft Project, for example), and may require those schedules to be undated or revised on a regular basis. CITY may require recovery schedules if CONTRACTOR falls behind the Project schedule. CITY's review or comment on the schedule shall not constitute acceptance thereof.

4. STARTING WORK. CONTRACTOR shall not begin work until authorized to do so in writing by CITY. No work will be authorized before the Effective Date.

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 3 of 12 ends

5. TERMINATION.

5.1. This Agreement may be terminated as set forth in the Special Provisions for this Project. If no termination clauses are included in the Special Provisions, this Agreement may be terminated for CONTRACTOR default. The following circumstances shall be deemed a CONTRACTOR default:

5.1 .1. A material breach of the contract where CONTRACTOR fails to cure the breach within ten days after CITY provides notice of the breach; provided, however, if the breach cannot
reasonably be cured within ten days, CONTRACTOR must have taken significant steps to cure the breach including, without limitation, providing a written plan acceptable to CITY to cure the default and immediately beginning to cure the default;

5.1.2. CONTRACTOR' s violation of any law, statute, regulation, rule, ordinance, permit or order of any governmental agency
applicable to the Project if CONTRACTOR does not cure the violation within ten days after CITY provides notice of the violation and demands a cure;

5.1.3. CONTRACTOR makes an assignment for benefit of creditors, admits an inability to pay debts, files a petition in bankruptcy or is otherwise determined bankrupt or insolvent; and

5.1.4. CONTRACTOR fails to adequately respond in writing to CITY's written demand for adequate assurances within ten days with all necessary information to assure CITY that CONTRACTOR has the financial and other necessary resources to perform the contract without breach. CONTRACTOR's failure to provide all information requested by CITY will be a material breach of this Agreement.

5.2. In the event of termination by CITY as set forth above, CONTRACTOR shall remain fully liable for any work not completed, liquidated damages (as set forth in the Special Provisions), delays by follow up contractors, materials and equipment provided, designs
commenced through the date of termination, and consequential damages. CONTRACTOR will immediately deliver to CITY possession of the work including all designs, engineering, project records, cost data, drawing specifications and contracts, and construction supplies and aids dedicated solely to performing the work.

CONTRACTOR shall assign all subcontracts to CITY; however, CITY may accept or reject those subcontracts at its sole discretion.

CONSTRUCTION PROJECTS AGREEM ENT
Updated - May 2026

Page 4 of 12 ends

6. 7.

5.3. Should CITY's termination for cause be determined by a court of law to be wrongful or without cause, such termination will be treated as a termination for convenience entitling CONTRACTOR to an equitable settlement for claims and liabilities outstanding at the date of termination and reasonable compensation for work actually performed to the date of termination. No other Compensation shall be due CONTRACTOR for termination for convenience.

COMPLIANCE WITH ALL LAWS. CONTRACTOR shall, at CONTRACTOR 's sole cost, comply with all of the requirements of Municipal, State, and Federal authorities now in force, or which may hereafter be in force, pertaining to this Agreement, and shall faithfully observe in all activities relating to or growing out of this Agreement all Municipal ordinances and State and Federal statutes, rules or regulations, and permitting requirements now in force or which may hereafter be in force including, without limitation, obtaining a City of Bakersfield business tax certificate (Bakersfield Municipal Code Chapter 5.02) where required.

INDEPENDENT CONTRACTOR. This Agreement calls for CONTRACTOR's performance of the Scope of Work as an independent contractor.

CONTRACTOR is not an agent or employee of the CITY for any purpose and is not entitled to any of the benefits provided by CITY to its employees. This Agreement shall not be construed as forming a partnership or any other association with CONTRACTOR other than that of an independent contractor.

8. DIRECTION. CONTRACTOR retains the right to control or direct the manner in which the services described herein are performed.

9. EQUIPMENT. CONTRACTOR will supply all equipment, tools, materials and supplies necessary to perform the services under this Agreement.

10. LICENSES. CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits and approvals which are legally required for CONTRACTOR to practice its profession and perform the Scope of Work. If CONTRACTOR is a corporation, at least one officer or key employee shall hold the required licenses or professional degrees. If CONTRACTOR is a partnership, at least one partner shall hold the required licensees or professional degrees. 11 . STANDARD OF PERFORMANCE. The Scope of Work shall be performed in conformity with all legal requirements and industry standards observed by a specialist of CONTRACTOR's profession in California.

CONSTRU CTION PROJECTS AGREEM ENT
Updated - Moy 2026

Page 5 of 12 ends

12. SB 854 COMPLIANCE. To the extent Labor Code Section 1771.1 applies to this Agreement, a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, be subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5.

It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029 .1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. The prime contractor is required to post job site notices in compliance with Title 8 California Code of Regulations Section 16451. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

13. NO WAIVER OF DEFAULT. The failure of any party to enforce against another party any provision of this Agreement shall not constitute a waiver of that party's right to enforce such a provision at a later time, and shall not serve to vary the terms of this Agreement.

14. INSURANCE AND SECURITY.

14.1. Types and Limits of Insurance. In addition to any other insurance or security required under this Agreement, CONTRACTOR must procure and maintain, for the duration of this Agreement, the types and limits of insurance below ("Basic Insurance Requirements").

14.1.1. Automobile liability insurance, providing coverage for owned, non-owned, and hired autos on an occurrence
basis for bodily injury, including death, of one or more persons, property damage, and personal injury, with limits of not less than $1,000,000 per occurrence.

14.1.2. Commercial general liability insurance, unless otherwise approved by CITY's Risk Manager, providing coverage on
an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal
injury, with limits of not less than $1,000,000 per occurrence.

The policy must:

14.1.2.1. Provide contractual liability coverage for the terms of this Agreement;

14.1.2.2. Provide products and completed operations
coverage;

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 6 of 12 ends

14.2. 14.1.2.3. Provide premises, operations, and mobile equipment coverage; and

14.1.2.4. Contain an additional insured endorsement in
favor of CITY and its mayor, council, officers,
agents, employees, and designated volunteers.

14.1.3. Workers' compensation insurance with limits of not less than $1 ,000,000 per occurrence. In accordance with the
provisions of Labor Code Section 3700, every contractor will be required to secure the payment of compensation to his employees. Pursuant to Labor Code Section 1861,
CONTRACTOR must submit to CITY the following
certification before beginning any work on the
Improvements:

I am aware of the provisions of Section 3700 of the
Labor Code which require every employer to be
insured against liability for worker's compensation or
to undertake self-insurance in accordance with the
provisions of that code, and I will comply with such
provisions before commencing the performance of
the work of this contract.

By executing this Agreement, CONTRACTOR is submitting
the certification required above.

The policy must contain a waiver of subrogation in favor of CITY and its mayor, council, officers, agents, employees, and designated volunteers.

General Provisions Applying to All Insurance Types.

14.2.1. All policies required of CONTRACTOR must be written on a first-dollar coverage basis, or contain a deductible
provision. Subject to CITY's advance approval,
CONTRACTOR may utilize a self-insured retention in any or all of the policies provided, but the policy or policies may not contain language, whether added by endorsement or
contained in the policy conditions, that prohibits
satisfaction of any self-insured provision or requirement by anyone other than the named insured or by any means
including other insurance or which is intended to defeat the intent or protection of an additional insured.

CONSTRUCTION PR OJECTS AGREEMENT
Updated - May 2026

Page 7 of 12 ends

14.2.2. All policies required of CONTRACTOR must be primary insurance as to CITY and its mayor, council, officers, agents, employees, or designated volunteers and any insurance or self-insurance maintained by CITY and its mayor, council, officers, agents, employees, and designated volunteers
must be excess of CONTRACTOR's insurance and must not
contribute with it.

14.2.3. The insurance required above, except for workers' compensation insurance, must be placed with insurers with a Best's rating as approved by CITY's Risk Manager, but in no event less than A-:YII. Any deductibles, self-insured retentions, or insurance in lesser amounts, or lack of certain types of insurance otherwise required by this Agreement, or insurance rated below Best's A-:YII, must be declared prior to execution of this Agreement and approved by CITY in
writing.

14.2.4. The insurance required in this section must be maintained until the Scope of Work is satisfactorily completed as
evidenced by CITY's written acceptance. All policies must provide that there will be continuing liability thereon, notwithstanding any recovery on any policy.

14.2.5. Full compensation for all premiums which the CONTRACTOR is required to pay to satisfy the Basic Insurance
Requirements shall be considered as included in the prices paid for the performance of the Scope of Work, and no
additional allowance will be made therefor or for additional premiums which may be required by extensions of the
policies of insurance.

14.2.6. It is further understood and agreed by CONTRACTOR that its liability to CITY will not in any way be limited to or affected by the amount of insurance obtained and carried by
CONTRACTOR in connection with this Agreement.

14.2.7. Unless otherwise approved by CITY, if any part of the Scope of Work is subcontracted, the Basic Insurance Requirements must be provided by, or on behalf of, all subcontractors even if CITY has approved lesser insurance requirements for CONTRACTOR, and all subcontractors must agree in writing to be bound by the provisions of this section.

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 8 of 12 ends

14.3. Security. CONTRACTOR shall provide performance and labor and material security in amounts and in a form suitable to CITY. CITY shall approve in writing all such security instruments before CONTRACTOR begins to perform the Scope of Work.

15. THIRD PARTY CLAIMS. In the case of public works contracts, CITY will timely notify CONTRACTOR of third party claims relating to this Agreement. CITY shall be allowed to recover from CONTRACTOR, and CONTRACTOR shall pay on demand, all costs of notification.

16. INDEMNITY. CONTRACTOR shall indemnify, defend, and hold harmless CITY and CITY's officers, agents and employees against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, arising out of, connected with, or caused by CONTRACTOR or CONTRACTOR's employees, agents, independent contractors, companies, or subcontractors in the performance of, or in any way arising from, the terms and provisions of this Agreement whether or not caused in part by a party indemnified hereunder, except for CITY's sole active negligence or willful misconduct.

17. REMEDIES. The remedies provided in this Agreement are cumulative and are in addition to any other remedies in law or equity which may be available to CITY. The election of one or more remedies shall not bar the use of other remedies unless the circumstances make the remedies incompatible.

18. SITE INSPECTION. CITY shall be allowed to inspect the construction site at any time and CONTRACTOR shall make all areas of the construction site available to inspection including, without limitation, any construction trailers or offices at the site and all plans, drawings, documents, schedules, photographs and other documentation relating to the Project.

19. STOP NOTICES OR LIENS. CONTRACTOR shall not allow any stop notices or liens to be filed on the Project and shall pay all costs and fees to CITY, including without limitation attorney's fees, incurred by CITY because of the filing of any such stop notice, lien or legal action relating thereto.

CONTRACTOR agrees that CITY may withhold from any funds held by CITY concerning CONTRACTOR's performance of the Scope of Work amounts sufficient to cover costs and fees, including without limitation attorney's fees, incurred by CITY because of the filing of any stop notice, lien, or legal action relating thereto.

20. ASSIGNMENT. Neither this Agreement nor any rights, interests, duties, liabilities, obligations or responsibilities arising out of, concerning or related

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 9 of 12 ends

in any way to this Agreement (including, but not limited to, accounts, actions, causes of action, claims, damages, demands, liabilities, losses, obligations, or reckonings of any kind or nature whatsoever, for compensatory or exemplary and punitive damages, or declaratory, equitable or injunctive relief, whether based on contract, equity, tort or other theories of recovery provided for by the common or statutory law) may be assigned or transferred by any party. Any such assignment is prohibited, and shall be unenforceable and otherwise null and void without the need for further action by the non-assigning party or parties. 21 . ACCOUNTING RECORDS. CONTRACTOR shall maintain accurate accounting records and other written documentation pertaining to all costs incurred in performance of this Agreement. Such records and documentation shall be kept at CONTRACTOR's office during the term of this Agreement, and for a period of three years from the date of the final payment hereunder, and made available to CITY representatives upon request at any time during regular business hours.

22. BINDING EFFECT. The rights and obligations of this Agreement shall inure to the benefit of, and be binding upon, the parties to the Agreement and their heirs, administrators, executors, personal representatives, successors and assigns.

23. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of entities represents and warrants that they are, respectively, duly authorized to sign on behalf of the entities and to bind the entities fully to each and all of the obligations set forth in this Agreement.

24. COUNTERPARTS. This Agreement may be executed in any number of counterparts, each of which shall be considered as an original and be effective as such.

25. EXECUTION. This Agreement is effective upon execution. It is the product of negotiation and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement.

26. EXHIBITS. In the event of a conflict between the terms, conditions or specifications set forth in this Agreement and those in exhibits attached hereto, the terms, conditions, or specifications set forth in this Agreement shall prevail. All exhibits to which reference is made in this Agreement are deemed incorporated in this Agreement, whether or not actually attached.

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 10 of 12 ends

27. FURTHER ASSURANCES. Each party shall execute and deliver such papers, documents, and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement.

28. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement and its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in Kern County, California.

29. INTERPRETATION. Whenever the context so requires, the masculine gender includes the feminine and neuter, and the singular number includes the plural.

30. MERGER AND MODIFICATION. This Agreement sets forth the entire agreement between the parties and supersedes all other oral or written representations. This Agreement may be modified only in a writing approved and signed by all the parties. If any modification of this Agreement results in total Compensation which exceeds $40,000, the modification must be approved by the City Council.

31. NON-INTEREST. No CITY officer or employee shall hold any interest in this Agreement (California Government Code section 1090).

32. NOTICES. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon actual personal service or depositing in the United States mail. The parties shall be addressed as follows, or at any other address designated by notice:

CITY: CITY OF BAKERSFIELD

CITY HALL
CONTRACTOR:
1600 Truxtun Avenue
Bakersfield, California 93301
J.L. PLANK INC. DBA CEN-CAL CONSTRUCTION
31207 Denbeste Court
Shafter, CA 93263

33. RESOURCE ALLOCATION. All CITY obligations under the terms of this Agreement are subject to the appropriation and allocation of resources by the City Council.

34. TITLE TO DOCUMENTS. All documents, plans, and drawings, maps,

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 11 of 12 ends

photographs, and other papers, or copies thereof prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation, become CITY property.

35. CONTRACTOR'S LICENSE INFORMATION.

License Number 962895
Expiration Date 06/30/2028
License Classification A- General Engineering
C 13 - Fencing

36. TAX NUMBERS.

CONTRACTOR's Federal Tax ID Number 45-27 49617
CONTRACTOR is a corporation? Yes X No __ _ (Please check one.) IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed, as of the Effective Date.
"CITY" "CONTRACTOR"
CITY OF BAKERSFIELD J.L. PLANK INC. DBA CEN-CAL

CONSTRUCTION
By: ___________ _

KAREN GOH
By·Q - A\Cuw7
o~PLk.

Mayor CORPORATE SECRET ARY
APPROVED AS TO CONTENT:

PUBLIC WORKS DEPARTMENT
By: _________ _

ZACHARY MEYER
Public Works Director
APPROVED AS TO FORM : COUNTERSIGNED:

Deputy City Attorney: _ ___ _ _ Finance Director: _____ _

ASHLEY ZAMBRANO RANDY MCKEEGAN
Insurance: __ _
AEZ/pt
Attachments: SEE SECTION 1.1 SCOPE OF WORK FOR LIST OF DOCUMENTS

CONSTRUCTION PROJECTS AGREEMENT
Updated - May 2026

Page 12 of 12 ends

ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Consent-Miscellaneous TO: Honorable Mayor and City Council
FROM: Kevin Albertson, Fire Chief
DATE: October 20, 2026
SUBJECT: Appropriate $10,600 from the California Fire Foundation charitable donation to the Fire Department General Fund Operating Budget to purchase wildland packs RECOMMENDATION:

Staff recommends approval of the appropriation.

BACKGROUND:

The Bakersfield Fire Department (BFD) was awarded a $10,600 charitable donation from California Fire Foundation (Cal Fire Foundation) to purchase wildfire web gear. This donation was made through Cal Fire Foundation 2026 Statewide Wildfire Safety and Preparedness Grant, which is dedicated to supporting California-based organizations in addressing wildfire and other climate-related disaster prevention and preparedness needs. The funds will be used to procure wildfire web gear for frontline crews to strengthen firefighter health and safety, reduce heat and ergonomic burden, and improve rapid initial -attack capability during wildfire and disaster operations.

FISCAL IMPACT:

Funding for equipment will be provided by donations to the Fire Department, therefore there will be no impact to the City General Fund.

COUNCIL GOAL:

Safety and Resilience
Innovative and Efficient City Government
ATTACHMENTS:

N/A

ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Consent - Miscellaneous TO: Honorable Mayor and City Council
FROM: Darin Budak, Recreation and Parks Director
DATE: October 9, 2026
SUBJECT: Fiscal Year 2025-26 Annual Compliance Report for Park Impact Fees prepared in accordance with California Government Code §66006 All Wards
RECOMMENDATION:

The Fiscal Year 2025-26 Annual Compliance Report for Park Impact Fees is now available for review.

BACKGROUND:

Attached is the City of Bakersfield’s Annual Compliance Report for Park Impact Fees for the fiscal year that ended June 30, 2026, prepared in compliance with California Government Code Section §66006.

On November 7, 1990, City Council adopted a park development and improvement fee program for the purposes of developing and improving parks and recreational facilities serving the residential development within the City of Bakersfield. Fees are collected based on the development’s share of cost to develop, improve, construct or enhance a public park.

On April 19, 1995, City Council established an orderly process for the dedication, reservation and acquisition of park land within the City of Bakersfield for the purpose of supplying public parks and recreation facilities. The subdivider shall dedicate, reserve land, pay a fee in-lieu, or a combination thereof, at the option of the Advisory Agency, for park or recreational purposes.

Government Code Section 66006 requires that the local agency shall, within 180 days after the last day of each fiscal year, make available to the public specific information as outlined in this Code Section. The attached Annual Compliance Report provides this information.

Pursuant to Government Code Section 66006, a local agency shall review the information made available to the public at the next regularly scheduled public meeting but not less than 15 days after thisinformation is made available to the public. After this public review period, the Annual Compliance Report will come again before City Council at the December 16, 2026 meeting for approval. Therefore, no City Council action is required at today’s meeting other than to make the information available to the public.

FISCAL IMPACT:

This is an annual compliance report required by the State of California. There is no fiscal impact.

COUNCIL GOAL:

Innovative and Efficient City Government
ATTACHMENTS:

RP 2025-26 PIF Compliance Report

CITY OF BAKERSFIELD
FISCAL YEAR 2025-2026

ANNUAL COMPLIANCE REPORT FOR

PARK IMPACT FEES
Prepared in accordance with California Government Code §66006

CITY OF BAKERSFIELD

ANNUAL COMPLIANCE REPORT FOR

PARK IMPACT FEES
(California Government Code § 66006)
FY 2025-2026
MAYOR
Karen Goh

CITY COUNCILMEMBERS
Eric Arias Councilmember, Ward 1
Andrae Gonzales Councilmember, Ward 2
Ken Weir Councilmember, Ward 3
Bob Smith Councilmember, Ward 4
Larry Koman Councilmember, Ward 5
Zack Bashirtash Councilmember, Ward 6
Manpreet Kaur Councilmember, Ward 7
Submitted by
Christian Clegg
City Manager

CITY OF BAKERSFIELD

EXECUTIVE STAFF
Christian Clegg City Manager
Virginia Gennaro City Attorney
Kristina Budak Water Resources Manager
Kevin Albertson Fire Chief
Darin Budak Recreation and Parks Director
Phil Burns Development Services Director
Greg Terry Police Chief
Zachary Meyer Public Works Director
Randy McKeegan Finance Director
Christi Tenter Human Resources
Annual Compliance Report for Park Impact Fees
(California Government Code § 66006)
Table of Contents
Page
Introduction……………………………………………………………………………………. 1
Summary of FY 2025-26 fiscal activity…………………………………………………….. 1 Annual reporting requirements……………………………..……………………………... 2 Description of fee………………………………….....……………………………………… 3
Amount of fee………………………………………..……………………………………….. 3
Beginning and ending fund balance…………………………………………………… 4 Fees collected and interest earned……………………………………………………… 4 Public improvements………………………………………………………………………… 4
Estimated timing of projects……………………………………………………………… 4
Inter-fund transfers/loans………………………………………………………………….. 4 Refunds………………………………………………………………………………………... 4
Public improvements………………………………………………………………………… Attachment A
Estimated timing of projects……………………………………………………………… Attachment B
Park Zone Map……………………………………………………………………………… Attachment
C
1 Introduction
Development Fee Types
As new residents move into the City of Bakersfield, they will require additional park and recreation services and capital facilities. In order to ensure that new development does not reduce the current level of service, the City of Bakersfield can charge new development to cover the cost of providing additional parkland and park facilities. Park development fees can be charged under two California Statutes; the Park Acquisition Fees (Quimby Act) and Park Development/Improvement Fees.

Park Development/Improvement Fee:

On November 7, 1990, Council adopted a park development and improvement fee program for the purposes of developing and improving parks and recreational facilities serving the residential development within the City of Bakersfield. Fees are collected based on the development’s share of cost to develop, improve, construct or enhance a public park.

Park Acquisition Fee:

On April 19, 1995, Council established an orderly process for the dedication, reservation and acquisition of park land within the city for the purpose of supplying public parks and recreation facilities. The subdivider shall dedicate, reserve land, pay a fee in-lieu, or a combination thereof, at the option of the Advisory Agency, for park or recreational purposes.

Government Code Section 66006 requires that the local agency shall, within 180 days after the last day of each fiscal year, make available to the public specific information. The specific information to be made available to the public is summarized on Page 2 of this Report.

Pursuant to Government Code Section 66006, after the information contained in the Report is made available to the public, the Council shall review the information in the Report at the next regularly scheduled public meeting. However, the public meeting must occur not less than 15 days after the information contained in the Report is made available to the public.

Summary of FY 2025-26 Fiscal Activity
South/Southwest Central Northeast
Zone 1 Zone 2 Zone 3 NOR Total
Fund Balance - Beginning 07/01/2025 $ 9,042,050 $ 2,259,206 $ 1,739,623 $ - $ 13,040,879 Revenues
Park Development and Acquisition Fees 3,500,215 1,094,666 358,688 4,953,570 North of the River Recreation and Parks 138,559 138,559 Interest Income 286,507 76,140 33,772 - 396,418
Total Revenues 5,488,547
Expenditures
Capital Projects 58,840 26,400 - - 85,240
Total Expenditures 85,240
Fund Balance - Ending 6/30/2026 $ 12,769,932 $ 3,403,612 $ 2,132,082 $ 138,559 $ 18,444,186 *https://www.bakersfieldcity.us/220/Annual-Comprehensive-Financial-Reports Park Improvement Fund*
2 Government code Section 66006 (b) (1) sets forth the annual compliance reporting requirements as:

For each separate account or fund established pursuant to subdivision (a), the local agency shall, within 180 days after the last day of each fiscal year, make available to the public the following information for the fiscal year:
(A) A brief description of the type of fee in the account or fund. (B) The amount of the fee.
(C) The beginning and ending balance of the account or fund. (D) The amount of the fees collected and the interest earned. (E) An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded with fees. (F) An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as identified in paragraph (2) of subdivision (a) of Section 66001, and the public improvement remains incomplete.
(G) A description of each inter-fund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an inter-fund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan. (H) The amount of refunds made pursuant to subdivision (e) of Section 66001 and any allocations pursuant to subdivision (f) of Section 66001.

Items A through H listed above are reproduced on each report to ensure accuracy, understanding, and compliance.
3 (A) Description of fee
Park Development/Improvement Fees:
• The fee for park development and improvement is to finance the development, improvement, and/or enhancement of public parks and recreation facilities. Funds shall be used exclusively for projects as identified in the capital improvement plan, the Parks Element of the Bakersfield Metropolitan General Plan, or comprehensive park plan approved by the City Council. (Ord. 3327)
• The City will collect a park development, improvement, and enhancement fee for each new dwelling unit within city boundaries. These fees will be imposed and collected at the date of final inspection or the date the certificate of occupancy is issued, whichever occurs first. Fee may be paid at time of building permit issuance if a developer chooses. (BMC 15.82.040)
Park Acquisition Fees:
• The subdivider shall dedicate land so that a park and its development shall be sufficient in size, topography and design that bear a reasonable relationship to serve the present and future needs of the residents of the subdivision and be consistent with the policies of the Bakersfield Metropolitan General Plan. When a fee is to be paid in-lieu of land dedication, the subdivider shall, in-lieu of dedicating land, pay a fee equal to the value of the land which would otherwise be required for dedication. (Ord. 3646) (B) Amount of fee
Park Development/Improvement Fee
• From July 1, 2025 to December 31, 2025, the Park Development and Improvement Fee was as follows*:

Residential – per living unit Fee
Single Family Dwelling $3,142
Duplex Dwelling Unit $3,142
Multiple Family Dwelling Unit $3,142
Mobile Home $3,142
*Resolution No. 164-2024 (available at: http://docs.bakersfieldcity.us/WebLink/Welcome.aspx) • From January 1, 2026 to June 30, 2026, the Park Development and Improvement Fee was as follows*:

Residential – per living unit Fee
Single Family Dwelling $3,278
Duplex Dwelling Unit $3,278
Multiple Family Dwelling Unit $3,278
Mobile Home $3,278
*Resolution No. 133-2025 (available at: http://docs.bakersfieldcity.us/WebLink/Welcome.aspx) 4 Park Acquisition Fee
• The amount of in-lieu fee shall be determined in accordance with the following formula**:

Number of Dwelling Units x .0025 x APPDU* x Fair Market Value Per Buildable Acre *APPDU: Average Persons Per Dwelling Unit sdfsdfsdfsdfsdfsdfsdfsdfsdfds **Ordinance No. 3646
(C) Beginning and ending fund balance*
• Park Development Fund
Beginning Balance @ 7/1/25 $ 13,040,879
Ending Balance @ 6/30/26 $ 18,305,627
* Note: NOR is an entity that is separate and distinct from City fund balance. The City collects park improvement fees and interest earned on those fees on behalf of NOR and holds them in a separate trust account. Beginning and ending NOR trust balance:

Beginning Balance @ 7/1/25 $ 4,633,576
Ending Balance @ 6/30/26 $ 3,984,420
(D) Fees collected and interest earned
Park Development/Improvement:
• North of the River Recreation and Parks Fees $ 298,514 • Park Development/Improvement Fees $ 4,445,262
• Interest Earned $ 534,977
Park Acquisition:
• Park Acquisition Fees $ 508,308
• Interest Earned $ 58,509
(E) Public Improvements
• See "Attachment A”

(F) Timing of projects
• See "Attachment B"
(G) Inter-fund transfers/loans
• No transfers were made during the fiscal year.
(H) Refunds
Park Development/Improvement
• No refunds were made during the fiscal year.

Project, Zone Fee Type: Project Description
Total Expendiures for
Park Development
Fund (Fund 321)
% of Total Project Cost
funded with park impact
fees and interest earnings
CITY
P5C13500, 1 Development Belcourt Park Developer Reimbursement 58,840.00 100.00% P1C01100, 2 Development Linnell-Brahma 26,400.00 91.72%

0.00%

0.00%

0.00%
TOTAL CITY 85,240.00
NOR
0%
TOTAL NOR 0.00
TOTAL CITY & NOR $ 85,240.00
Attachment A
Summary of Expenditures for Park Improvement Fund
For Fiscal Year 2025-26

1 -.

!"

# $

& .)6E
#

6%

?#F4%

!
&0$

6,

) '

E

6 #$

'+

$

6 + +

1*
)2

%
&*)0*
Attachment B
Attachment C

ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Consent - Successor Agency TO: Honorable Mayor and City Council
FROM: Randy McKeegan, Finance Director
DATE: October 21, 2026
SUBJECT: Receive and file Successor Agency payments from October 7, 2026, to October 20, 2026, in the amount of $4,620.00.
[Document Description]
RECOMMENDATION:

Staff recommends report be received and filed.

BACKGROUND:

The City administers payment of Successor Agency enforceable obligation payments as authorized by the State Department of Finance (DOF) to further the dissolution of the former Bakersfield Redevelopment Agency. The Successor Agency has a Recognized Obligation Payment Schedule (ROPS) approved by both the Bakersfield Oversight Board and the DOF. All payments of the Successor Agency must be on this approved listing in order to be valid and authorized payments of the Successor Agency.

A check register is provided which summarizes the transactions processed during the above referenced period. Additional details are provided below for each transaction.

Check #824557 to U S BANK TRUST NA for $4,620.00 is for admin fees for tax allocation bonds.

FISCAL IMPACT:
$4,620.00
COUNCIL GOAL:

Innovative and Efficient City Government
ATTACHMENTS:

Oracle SA Admin Check Register 11.04.26
10/21/2026 AP - CHECK REGISTER - SUCCESSOR AGENCY
FROM
10/07/2026 - 10/20/2026
PAGE 1
Payment
Number Fund Vendor Name Check Date Check Total
824557 3710 U S BANK TRUST NA 10/8/2026 $ 4,620.00
0 $4,620.00
E-Payables
Number
Vendor
Number Vendor Name E-Payable Date E-Payables Amount

0.00 0 $0.00
0 $4,620.00
Disbursement Total
S:\Accounting\LACEY\ADMIN-COUNCIL\2026\COUNCIL - SA\11.04.26\

ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Consent – Public Hearings TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: October 13, 2026
SUBJECT: Public Hearing for the Prohousing Designation Program Application and Adoption of Resolution authorizing an application to apply and participate in the Department of Housing and Community Development Prohousing Designation Program.

RECOMMENDATION:

Staff recommends opening the public hearing, receiving comment and adoption of the resolution.

BACKGROUND:

The California Department of Housing and Community Development (HCD) administers the Prohousing Designation Program which recognizes jurisdictions that go above-and-beyond state housing law to help accelerate housing production. Jurisdictions that receive a Prohousing Designation may receive additional funding points in certain housing and infrastructure funding opportunities. The City intends to seek Prohousing Designation from HCD to recognize policies that support housing production and improve competitiveness for specific funding opportunities.

The Prohousing Designation application asks jurisdictions to provide evidence of enacted or proposed policies in four categories: Favorable Zoning and Land Use; Acceleration of Housing Production Timeframes, Reduction of Construction and Development Costs; and Providing Financial Subsidies.

Applicants must provide at least one qualifying policy in each category and a total score of at least 30 points. The City’s draft application has a self-score of 39 points spread across the four categories.

Additionally, the application requires a 30-day public review period to allow the public to review the draft application and provide comments for consideration before submission. The application requires the City to hold a public hearing at a City Council meeting informing the public of the City’s intent to submit an application. The intent of this public hearing is to satisfy this requirement and provide an additional opportunity for the public to submit comments on the draft application.

There is also resolution for Council consideration reaffirming the City’s intent to apply for Prohousing Designation and authorizing submission of the application to the California Department of Housing and Community Development. Adoption of the resolution fulfills the program’s requirement for formal authorization by the City’s governing body.

FISCAL IMPACT:

The action to adopt the resolution for the a Prohouing designation will not incur cost or impact to the City General Fund.

COUNCIL GOAL:

Community Character & Quality of Life
ATTACHMENT:

1. Draft Application

2. Resolution

Page 1 of 2 ends

RESOLUTION NO. _____________

A RESOLUTION OF THE COUNCIL OF THE CITY OF

BAKERSFIELD AUTHORIZING APPLICATION TO AND

PARTICIPATION IN THE PROHOUSING DESIGNATION

PROGRAM
WHEREAS, California Government Code section 65589.9 et. seq. sets forth the Prohousing Designation Program (“Program”), which creates incentives for jurisdictions that are compliant with California housing element requirements and that have enacted prohousing local policies; and
WHEREAS, the California Department of Housing and Community Development (“Department”) has adopted regulations (Cal. Code Regs., tit. 25, § 6600 et seq.) to implement the Program (“Program Regulations”), as authorized by Government Code section 65589.9, subdivision (d); and
WHEREAS, jurisdictions designated as “Prohousing” by the Department will receive additional points or other preference during the scoring of competitive applications for specified State housing and infrastructure funding; and WHEREAS, the City of Bakersfield (“City”) desires to submit an application to be permitted to declare itself a Prohousing Designation.

NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows:

1. City is hereby authorized and directed to submit an application to the Department to be authorized as a Prohousing Designation.

2. City acknowledges and confirms that it is currently in compliance with applicable state housing law.

3. City acknowledges and confirms that it will continue to comply with applicable housing laws and to refrain from enacting laws, developing policies, or taking other local governmental actions that may or do inhibit or constrain housing production.

Examples of such local laws, policies, and actions include moratoriums on development; local voter approval requirements related to housing production; downzoning; and unduly restrictive or onerous zoning regulations, development standards, or permit procedures.

4. City further acknowledges and confirms that the Prohousing Policies in its application comply with its duty to Affirmatively Further Fair Housing pursuant to Government Code sections 8899.50 and 65583. Applicant further acknowledges and confirms that its general plan is in alignment with an adopted sustainable communities strategy pursuant to Public Resources Code section 21155- 21155.4.

Page 2 of 2 ends

5. City further acknowledges and confirms that its policies for the treatment of homeless encampments on public property comply with and will continue to comply with the Constitution and that it has enacted best practices in its jurisdiction that are consistent with the United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments” (June 17, 2022, update).

6. If City’s application is approved, City is hereby authorized and directed to enter into, execute, and deliver all documents required or deemed necessary or appropriate to participate in the Program, and all amendments thereto (the “Program Documents”).

7. City acknowledges and agrees that it shall be subject to the application; the terms and conditions specified in the Program Documents; the Program Regulations; and any and all other applicable law when it agrees to participate in the Program.

8. The City Manager is authorized to execute and deliver the application and the relevant Program Documents on behalf of City to be considered a Prohousing Designation.
----------o0o---------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on _____________________ by the following vote:

AYES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER:

ABSTAIN: COUNCILMEMBER:

ABSENT: COUNCILMEMBER:
__________________________________________

JULIE DRIMAKIS, CPMC, MMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED _________________
By: _______________________________

KAREN GOH
Mayor
APPROVED AS TO FORM:

City Attorney: _____________________________________

VIRGINIA GENNARO
Rev 2/3/25
Prohousing Designation Program Application
State of California
Governor Gavin Newsom
Tomiquia Moss, Secretary
Business, Consumer Services and Housing Agency
Gustavo Velasquez, Director
Department of Housing and Community Development
Megan Kirkeby, Deputy Director
Division of Housing Policy Development
651 Bannon Street
Sacramento, CA 95811
Website: http://www.hcd.ca.gov/planning-and-community-development/prohousing-designation-program Email: [email protected]
February 2025
Rev 2/3/25
Prohousing Designation Program Application Package
Instructions
The applicant is applying for a Prohousing Designation under the Prohousing Designation Program (“Prohousing” or “Program”), which is administered by the Department of Housing and Community Development (“Department”) pursuant to Government Code section 65589.9.

The Program creates incentives for Jurisdictions that are compliant with State Housing Element Law and that have enacted Prohousing Policies. These incentives will take the form of additional points or other preference in the scoring of applications for competitive housing and infrastructure programs. The administrators of each such program will determine the value and form of the preference.

In order to be considered for a Prohousing Designation, the applicant must accurately complete all sections of this application, including any relevant appendices. The Department reserves the right to request additional clarifying information from the applicant.

This application is subject to Government Code section 65589.9 and to the regulations (Cal.

Code Regs., tit. 25, § 6600 et seq.) adopted by the Department in promulgation thereof (“Regulations”). All capitalized terms in this application shall have the meanings set forth in the Regulations.

All applicants must submit a complete, signed application package to the Department, in electronic format, in order to be considered for a Prohousing Designation. Please direct electronic copies of the completed application package to the following email address:

[email protected].

A complete application will include all items identified in the Application Checklist.

In relation to Appendix 1, the Formal Resolution for the Prohousing Designation Program, please use strikethrough and underline if proposing any modifications to the text of the Resolution. Please be aware, any sustentative deviations from the Formal Resolution may result in an incomplete application and will likely be subject to additional internal review and potential delays.

Appendix 2, the Proposed Policy Completion Schedule, applies only if an application includes proposed policies.

Appendix 3, Self-Scoring Sheet and Sample Self-Scoring Sheet, includes a blank template to be completed by the applicant as part of the application, as well as a Sample Self-Scoring Sheet with an example of how this template may be completed.

Appendix 4 lists examples of Prohousing Policies with enhancement factors to aid applicants in understanding how enhancement factors may be applied.

Appendix 5 provides a sample template to assist applicants with confirming the treatment of homeless encampments within the jurisdiction is consistent with USICH’s “7 Principles for Addressing Encampments.”
Rev 2/3/25
Appendix 6 provides a checklist to confirm that a Diligent Public Participation Process was conducted.

Appendix 7 is where the applicant will include any additional information and supporting documentation for the application.

If you have questions regarding this application or the Program, or if you require technical assistance in preparing this application, please email [email protected].

Rev 2/3/25
Application Checklist
Yes No
Application Information ☒ ☐
Certification and Acknowledgement ☐ ☐
The Legislative Information form is completed. ☒ ☐
The Threshold Requirements Checklist is completed. ☐ ☐
A duly adopted and certified Formal Resolution for the Prohousing Designation Program is included in the application package. (See Appendix 1 for the Formal Resolution for the Prohousing Designation Program form.)
☐ ☐
If applicable, the Proposed Policy Completion Schedule is completed. (See Appendix 2.)
☒ ☐
The Self-Scoring Sheet is completed. (See Appendix 3 for the Self-Scoring Sheet and the Sample Self-Scoring Sheet.) ☒ ☐
One-page summary describing consistency with the 7 Principles for Addressing Encampments is completed. (See Appendix 5 for a template to assist.)
☒ ☐
The checklist confirming that a Diligent Public Participation process was conducted. (See Appendix 6 for the template.)
☐ ☐
Additional information and supporting documentation (Applicant to provide as Appendix 7.)
☒ ☐
Application Information
Applicant (Jurisdiction): City of Bakersfield
Applicant Mailing Address: 1600 Truxtun Avenue
City: Bakersfield
ZIP Code: 93301
Website: www.bakersfieldcity.us
Authorized Representative Name Christian Clegg
Authorized Representative Title: City Manager
Phone: 661-326-3971
Email: [email protected]
Contact Person Name: Cecelia Griego
Contact Person Title: ECD Supervisor
Phone: 661-326-3788
Email: [email protected]
Total Self-Score (Based on Appendix 3): 39
Rev 2/3/25

CERTIFICATION AND ACKNOWLEDGMENT
As authorized by the Formal Resolution for the Prohousing Designation Program (Resolution No. ), which is attached hereto and incorporated by reference as if set forth in full, I hereby submit this full and complete application on behalf of the applicant.

I certify that all information and representations set forth in this application are true and correct.

I further certify that any proposed Prohousing Policy identified herein will be enacted within two (2) years of the date of this application submittal.

I acknowledge that this application constitutes a public record under the California Public Records Act (Gov. Code, § 6250 et seq.) and is therefore subject to public disclosure by the Department.

Signature: __________________________________________
Name and Title: __Christian Clegg, City Manager_________ Date: _______________________________________________
Legislative Information
District Number Legislators Name(s)
State
Assembly
District
32 & 35 Stan Ellis and Jasmeet Kaur Bains
State
Senate
District
12 & 16 Shannon Grove and Melissa Hurtado
Applicants can find their respective State Senate representatives at https://www.senate.ca.gov/, and their respective State Assembly representatives at https://www.assembly.ca.gov/
Rev 2/3/25
Threshold Requirements Checklist
The applicant meets the following threshold requirements in accordance with Section 6604 of the Regulations:

Yes No
The applicant is a Jurisdiction. ☒ ☐
The applicant has adopted a Compliant Housing Element. ☒ ☐ The applicant has submitted or will submit a legally sufficient Annual Progress Report prior to designation.
☒ ☐
The applicant has completed or agrees to complete, on or before the relevant statutory deadlines, any rezone program or zoning that is necessary to remain in compliance with Government Code sections 65583, subdivision (c)(1), and 65584.09, subdivision (a), and with California Coastal Commission certification where appropriate. ☒ ☐
The applicant is in compliance, at the time of the application, with applicable state housing law, including, but not limited to those included in Government Code section 65585, subdivision (j); laws relating to the imposition of school facilities fees or other requirements (Gov. Code, § 65995 et seq.); Least Cost Zoning Law (Gov. Code, § 65913.1); Permit Streamlining Act (Gov. Code, § 65920 et seq.); and provisions relating to timeliness of CEQA processing by local governments in Public Resources Code sections 21080.1, 21080.2, and 21151.5(a). ☒ ☐
The applicant further acknowledges and confirms that its treatment of homeless encampments on public property complies with and will continue to comply with the constitutional rights of persons experiencing homelessness and that it has submitted a one-page summary to the Department demonstrating how the applicant has enacted best practices in their jurisdiction related to the treatment of unhoused individuals camping on public property, consistent with United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments,” (June 17, 2022 update), hereby incorporated by reference. ☒ ☐
The applicant has duly adopted and certified, by the applicant’s governing body, a Formal Resolution for the Prohousing Designation Program, which is hereby incorporated by reference. (A true and correct copy of the resolution is included in this application package.) ☐ ☐
Rev 2/3/25
Scoring Criteria
Category 1: Favorable Zoning and Land Use
Category Prohousing Policy Description Points
1A Sufficient sites, including rezoning, to accommodate 150 percent or greater of the current or draft RHNA, whichever is greater, by total and income category. These additional sites must be identified in the Jurisdiction’s housing element adequate sites inventory, consistent with Government Code section 65583, subdivisions (a)(3) and (c)(1). 3 1B Permitting missing middle housing uses (e.g., duplexes, triplexes, and fourplexes) by right in existing low-density, single-family residential zones in a manner that exceeds the requirements of SB 9 (Chapter 162, Statutes of 2021, Gov. Code, §§ 65852.21, 66411.7). 3 1C Sufficient sites, including rezoning, to accommodate 125 to 149 percent of the current or draft RHNA, whichever is greater, by total and income category. These points shall not be awarded if the applicant earns three points pursuant to Category (1)(A) above. These additional sites must be identified in the Jurisdiction’s housing element adequate sites inventory, consistent with Government Code section 65583, subdivisions (a)(3) and (c)(1).
2 1D Density bonus programs that allow additional density for additional affordability beyond minimum statutory requirements (Gov. Code, § 65915 et seq.).
2 1E Increasing allowable density in low-density, single-family residential areas beyond the requirements of state Accessory Dwelling Unit Law, (Gov. Code, §§ 65852.2, 65852.22) (e.g., permitting more than one converted ADU; one detached, new construction ADU; and one JADU per single-family lot), and in a manner that exceeds the requirements of SB 9 (Chapter 192, Statutes of 2021, Gov. Code, §§ 65852.21, 66411.7). These policies shall be separate from any qualifying policies under Category (1)(B).
2 1F Eliminating minimum parking requirements for residential development as authorized by Government Code section 65852.2; adopting vehicular parking ratios that are less than the relevant ratio thresholds at subparagraphs (A), (B), and (C) of Gov. Code section 65915, subdivision (p)(1); or adopting maximum parking requirements at or less than ratios pursuant to Gov. Code section 65915, subdivision (p).
2 1G Zoning or incentives that are designed to increase affordable housing development in a range of types, including, but not limited to, large family units, Supportive Housing, housing for transition age foster youth, and deep affordability targeted for Extremely Low-Income Households in all parts of the Jurisdiction, with at least some of the zoning, other land use designation methods, or incentives being designed to increase affordable housing development in higher resource areas shown in the TCAC/HCD Opportunity Map, and with the Jurisdiction having confirmed that it considered and addressed potential environmental justice issues in adopting and implementing 2 Rev 2/3/25
this policy, especially in areas with existing industrial and polluting uses.
1H Zoning or other land use designation methods to allow for residential or mixed uses in one or more non-residential zones (e.g., commercial, light industrial). Qualifying non-residential zones do not include open space or substantially similar zones.
1 1I Modification of development standards and other applicable zoning provisions or land use designation methods to promote greater development intensity. Potential areas of focus include floor area ratio, height limits, minimum lot or unit sizes, setbacks, and allowable dwelling units per acre. These policies must be separate from any qualifying policies under Category (1)(B) above.
1 1J Establishment of a Workforce Housing Opportunity Zone, as defined in Government Code section 65620, or a Housing Sustainability District, as defined in Government Code section 66200.
1 1K Establishment of an inclusionary housing program requiring new developments to include housing affordable to and reserved for low-and very low-income households, consistent with the requirements of AB 1505 (Chapter 376, Statutes of 2017, Gov. Code, § 65850.01). 1 1L Other zoning and land use actions not described in Categories (A)-(K) of this section that measurably support the Acceleration of Housing Production.
1 Rev 2/3/25
Scoring Criteria
Category 2: Acceleration of Housing Production Timeframes Category Prohousing Policy Description Points
2A Establishment of ministerial approval processes for multiple housing types, including, for example, single-family, multifamily and mixed-use housing.
3 2B Acceleration of Housing Production through the establishment of streamlined, program-level CEQA analysis and certification of general plans, community plans, specific plans with accompanying Environmental Impact Reports (EIR), and related documents. 2 2C Documented practice of streamlining housing development at the project level, such as by enabling a by-right approval process or by utilizing statutory and categorical exemptions as authorized by applicable law, (e.g., Pub. Resources Code, §§ 21155.1, 21155.4, 21159.24, 21159.25; Gov. Code, § 65457; Cal Code Regs., tit. 14, §§ 15303, 15332; Pub. Resources Code, §§ 21094.5, 21099, 21155.2, 21159.28).
2 2D Establishment of permitting processes that take less than four months to complete. Policies under this category must address all approvals necessary to issue building permits.
2 2E Absence or elimination of public hearings for projects consistent with zoning and the general plan.
2 2F Priority permit processing or reduced plan check times for homes affordable to Lower-Income Households.
2 2G Establishment of consolidated or streamlined permit processes that minimize the levels of review and approval required for projects, and that are consistent with zoning regulations and the general plan. 1 2H Absence, elimination, or replacement of subjective development and design standards with objective development and design standards that simplify zoning clearance and improve approval certainty and timing.
1 2I Establishment of one-stop-shop permitting processes or a single point of contact where entitlements are coordinated across city approval functions (e.g., planning, public works, building) from entitlement application to certificate of occupancy.
1 2J Priority permit processing or reduced plan check times for ADUs/JADUs or multifamily housing.
1 2K Establishment of a standardized application form for all entitlement applications.
1 2L Documented practice of publicly posting status updates on project permit approvals on the internet.
1 2M Limitation on the total number of hearings for any project to three or fewer. Applicants that accrue points pursuant to category (2)(E) are not eligible for points under this category.
1 2N Other policies not described in Categories (2)(A)-(M) of this section that quantifiably decrease production timeframes or promote the streamlining of approval processes.
1 Scoring Criteria
Rev 2/3/25
Category 3: Reduction of Construction and Development Costs Category Prohousing Policy Description Points
3A Waiver or significant reduction of development impact fees for residential development with units affordable to Lower-Income Households. This provision does not include fees associated with the provision of housing affordable to Lower-Income Households (e.g., inclusionary in lieu fees, affordable housing impact fees, and commercial linkage fees).
3 3B Adoption of policies that result in less restrictive requirements than Government Code sections 65852.2 and 65852.22 to reduce barriers for property owners to create ADUs/JADUs. Examples of qualifying policies include, but are not limited to, development standards improvements, permit processing improvements, dedicated ADU/JADU staff, technical assistance programs, and pre-approved ADU/JADU design packages.
2 3C Adoption of other fee reduction strategies separate from Category (3)(A), including fee deferrals and reduced fees for housing for persons with special needs. This provision does not include fees associated with the provision of housing affordable to Lower-Income Households (e.g., inclusionary in lieu fees, affordable impact fees and commercial linkage fees).
1 3D Accelerating innovative housing production through innovative housing types (e.g., manufactured homes, recreational vehicles, park models, community ownership, and other forms of social housing) that reduce development costs.
1 3E Measures that reduce costs for transportation-related infrastructure or programs that encourage active modes of transportation or other alternatives to automobiles. Qualifying policies include, but are not limited to, publicly funded programs to expand sidewalks or protect bike/micro-mobility lanes, creation of on-street parking for bikes, transit-related improvements, or establishment of carshare programs. 1 3F Adoption of universal design ordinances pursuant to Health and Safety Code section 17959.
1 3G Establishment of pre-approved or prototype plans for missing middle housing types (e.g., duplexes, triplexes, and fourplexes) in low-density, single-family residential areas. 1 3H Adoption of ordinances that reduce barriers, beyond existing law, for the development of housing affordable to Lower-Income Households. 1 3I Other policies not described in Categories (3)(A)-(H) of this section that quantifiably reduce construction or development costs. 1 Rev 2/3/25
Scoring Criteria
Category 4: Providing Financial Subsidies
Category Prohousing Policy Description Points
4A Establishment of a housing fund or contribution of funds towards affordable housing through proceeds from approved ballot measures.
2 4B Establishment of local housing trust funds or collaboration on a regional housing trust fund, which include the Jurisdiction’s own funding contributions. The Jurisdiction must contribute to the local or regional housing trust fund regularly and significantly. For the purposes of this Category, “regularly” shall be defined as at least annually, and “significant” contributions shall be determined based on the impact the contributions have in accelerating the production of affordable housing.
2 4C Demonstration of regular use or planned regular use of funding (e.g., federal, state, or local) for preserving assisted units at-risk of conversion to market rate uses and conversion of market rate uses to units with affordability restrictions (e.g., acquisition/rehabilitation).

For the purposes of this category, “regular use” can be demonstrated through the number of units preserved annually by utilizing this funding source.
2 4D Provide grants or low-interest loans for ADU/JADU construction affordable to Lower- and Moderate-Income Households.
2 4E A comprehensive program that complies with the Surplus Land Act (Gov. Code, § 54220 et seq.) and that makes publicly owned land available for affordable housing, or for multifamily housing projects with the highest feasible percentage of units affordable to Lower Income Households. A qualifying program may utilize mechanisms such as land donations, land sales with significant write-downs, or below-market land leases.
2 4F Establishment of an Enhanced Infrastructure Financing District or similar local financing tool that, to the extent feasible, directly supports housing developments in an area where at least 20 percent of the residences will be affordable to Lower-Income Households. 2 4G Prioritization of local general funds to accelerate the production of housing affordable to Lower-Income Households.
2 4H Directed residual redevelopment funds to accelerate the production of affordable housing.
1 4I Development and regular (at least biennial) use of a housing subsidy pool, local or regional trust fund, or other similar funding source sufficient to facilitate and support the development of housing affordable to Lower-Income Households.
1 Rev 2/3/25
4J Prioritization of local general funds for affordable housing. This point shall not be awarded if the applicant earns two points pursuant to Category (4)(G).
1 4K Providing operating subsidies for permanent Supportive Housing. 1 4L Providing subsidies for housing affordable to Extremely Low-Income Households.
1 4M Other policies not described in Categories (4)(A)-(L) of this section that quantifiably promote, develop, or leverage financial resources for housing affordable to Lower-Income Households.
1 Rev 2/3/25
Scoring Criteria
Enhancement Factors
The Department shall utilize enhancement factors to increase the point scores of Prohousing Policies. An individual Prohousing Policy may not use more than one enhancement factor.

Each Prohousing Policy will receive extra points for enhancement factors in accordance with the chart below.

Category Prohousing Policy Description Points
1 The policy represents one element of a unified, multi-faceted strategy to promote multiple planning objectives, such as efficient land use, access to public transportation, housing affordable to Lower-Income Households, climate change solutions, and/or hazard mitigation.
2 2 Policies that promote development consistent with the state planning priorities pursuant to Government Code section 65041.1. 1 3 Policies that diversify planning and target community and economic development investments (housing and non-housing) toward place-based strategies for community revitalization and equitable quality of life in lower opportunity areas. Such areas include, but are not limited to, Low Resource and High Segregation & Poverty areas designated in the most recently updated TCAC/HCD Opportunity Maps, and disadvantaged communities pursuant to Health and Safety Code sections 39711 and 39715 (California Senate Bill 535 (2012).
1 4 Policies that go beyond state law requirements in reducing displacement of Lower-Income Households and conserving existing housing stock that is affordable to Lower-Income Households. 1 5 Rezoning and other policies that support intensification of residential development in Location Efficient Communities.
1 6 Rezoning and other policies that result in a net gain of housing capacity while concurrently mitigating development impacts on or from Environmentally Sensitive or Hazardous Areas.
1 7 Zoning policies, including inclusionary housing policies, that increase housing choices and affordability, particularly for Lower-Income Households, in High Resource and Highest Resource areas, as designated in the most recently updated TCAC/HCD Opportunity Maps.
1 8 Other policies that involve meaningful actions towards Affirmatively Furthering Fair Housing outside of those required pursuant to Government Code sections 65583, subdivision (c)(10), and 8899.50, including, but not limited to, outreach campaigns, updated zoning codes, and expanded access to financing support.
1 Self-Scoring Sheet Instructions
The Department shall validate applicants’ scores based on the extent to which each identified Prohousing Policy contributes to the Acceleration of Housing Production. The Department shall assess applicants’ Prohousing Policies in accordance with statutory requirements and the Regulations.

The Department shall further assess applicants’ Prohousing Policies using the following four scoring categories: Favorable Zoning and Land Use, Acceleration of Housing Production Timeframes, Reduction of Construction and Development Costs, and Providing Financial Subsidies. Applicants shall demonstrate that they have enacted or proposed at least one policy that significantly contributes to the Acceleration of Housing Production in each of the four categories. A Prohousing Designation requires a total score of 30 points or more across all four categories.

Instructions
Please utilize one row of the Self-Scoring Sheet for each Prohousing Policy. • Category Number: Select the relevant category number from the relevant Scoring Criteria list in this application. Where appropriate, applicants may utilize a category number more than once. • Concise Written Description of Prohousing Policy: Set forth a brief description of the enacted or proposed Prohousing Policy.
• Enacted or Proposed: Identify the Prohousing Policy as enacted or proposed. For proposed Prohousing Policies, please complete Appendix 2: Proposed Policy Completion Schedule. • Documentation Type: For enacted Prohousing Policies, identify the relevant documentary evidence (e.g., resolution, zoning code provisions). For proposed Prohousing Policies, identify the documentation which shows that implementation of the policy is pending.
• Web Links/Electronic Copies: Insert the Web link(s) to the relevant documentation or indicate that electronic copies of the documentation have been attached to this application as Appendix 7. • Points: Enter the appropriate number of points using the relevant Scoring Criteria list in this application. • Enhancement Category Number (optional): If utilizing an enhancement factor for a particular Prohousing Policy, enter the appropriate category number using the relevant Scoring Criteria list in this application. • Enhancement Points (optional): If utilizing an enhancement factor for a particular Prohousing Policy, enter the point(s) for that Prohousing Policy.
• Total Points: Add the enhancement point(s) to the Prohousing Policy’s general point score.

Appendix 1: Formal Resolution for the Prohousing Designation Program RESOLUTION NO. _____________

A RESOLUTION OF THE COUNCIL OF THE CITY OF

BAKERSFIELD AUTHORIZING APPLICATION TO AND

PARTICIPATION IN THE PROHOUSING DESIGNATION

PROGRAM
WHEREAS, Government Code section 65589.9 established the Prohousing Designation Program (“Program”), which creates incentives for jurisdictions that are compliant with state housing element requirements and that have enacted Prohousing local policies; and
WHEREAS,such jurisdictions will be designatedProhousing, and, as such, will receive additional points or other preference during the scoring of their competitive Applications for specified housing and infrastructure funding; and
WHEREAS, the California Department of Housing and Community Development (“Department”) has adopted regulations (Cal. Code Regs., tit. 25, § 6600 et seq.) to implement the Program (“Program Regulations”), as authorized by Government Code section 65589.9, subdivision (d); and
WHEREAS, the City of Bakersfield (“Applicant”) desires to submit an Application for a Prohousing Designation (“Application”).

NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows:

1. Applicant is hereby authorized and directed to submit an Application to the Department.

2. Applicant acknowledges and confirms that it is currently in compliance with applicable state housing law.

3. Applicant acknowledges and confirms that it will continue to comply with applicable housing laws and to refrain from enacting laws, developing policies, or taking other local governmental actions that may or do inhibit or constrain housing production. Examples of such local laws, policies, and actions include moratoriums on development; local voter approval requirements related to housing production; downzoning; and unduly restrictive or onerous zoning regulations, development standards, or permit procedures. Applicant further acknowledges and confirms that the Prohousing Policies in its Application comply with its duty to Affirmatively Further Fair Housing pursuant to Government Code sections 8899.50 and 65583. Applicant further acknowledges and confirms that its general plan is in alignment with an adopted sustainable communities strategy pursuant to Public Resources Code section 21155- 21155.4. Applicant further acknowledges and confirms that its policies for the treatment of homeless encampments on public property comply with and will continue to comply with the Constitution and that it has enacted best practices in its jurisdiction that are consistent with the United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments” (June 17, 2022, update).

4. If the Application is approved, Applicant is hereby authorized and directed to enter into, execute, and deliver all documents required or deemed necessary or appropriate to participate in the Program, and all amendments thereto (the “Program Documents”).

5. Applicant acknowledges and agrees that it shall be subject to the Application; the terms and conditions specified in the Program Documents; the Program Regulations; and any and all other applicable law.

6. The City Manager is authorized to execute and deliver the Application and the Program Documents on behalf of the Applicant for participation in the Program.

I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on ______________________________ by the following vote:

AYES: COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, KOMAN, BASHIRTASH, KAUR NOES: COUNCILMEMBER ________________________________________________________ ABSTAIN: COUNCILMEMBER _______ _
ABSENT: COUNCILMEMBER __________________________________________________________ ________________________________

JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: _________________
By __________________________

KAREN GOH
Mayor
APPROVED AS TO FORM:

VIRGINIA GENNARO, CITY ATTORNEY
By _________________________
Virginia Gennaro
City Attorney
Appendix 2: Proposed Policy Completion Schedule
Category
Number
Concise Written Description of
Proposed Policy
Key Milestones and
Milestone Dates
Anticipated
Completion
Date
Notes
1D Once the new GP is adopted the city
will be completing a comprehensive
zoning code update that will allow
more density for affordable units above
statutory requirements by reducing
zoning requirements such as reducing
set backs, landscaping, amenities, etc.

Zoning Code update December
2027
1L Update zoning flexibility tools such as
height averaging, shared parking, or
reduced setbacks in exchange for
public benefits (e.g., affordable
housing) to accelerate development.

Zoning Code update December
2027
2B The city will have a newly adopted
General Plan with a program level EIR
that will streamline CEQA and
environmental review of residential
development.

Adopt General Plan and
Certify EIR
June 2027
4H The city has residual redevelopment
funds that it plans to direct to
affordable housing.

RDA reuse plan December
2027
2F The city is currently updating the
permit process to prioritize deed
restricted affordable housing projects.

Modeled after the expedited residential
solar program the city will prepare an
eligibility checklist, permit process and
inspection guide and requirements
bulletin.

Permit process
checklist, guide and
bulletin.

December
2027
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
1D The city is proposing allowing more density by reducing zoning requirements (aka reducing setback,
landscaping) based on number of affordable units.

Proposed In development N/A 2 N/A N/A 2
1F The city eliminated parking requirements in single family zones, deed restricted affordable housing, central
district and OTK and multi-family projects of less than 20 units.

Enacted Ordinance 5183
BMC Chapter

17.10.030(C)
Ordinance 5183
Attached
BMC Chapter

17.10.030(C)
2 N/A N/A 2
1G Bakersfield City Council amended the City’s Zoning
Ordinance (BMC 17.10.020) in November 2025 to allow
by right approval for housing developments that include at least 20% of units as affordable for lower income
households on vacant sites included in a previous
housing cycle. Can be found in Council Ordinances
5205 and 5206.

Enacted BMC Chapter

17.10.020
Ordinance 5205
and 5206
BMC Chapter

17.10.020
Ordinance 5205 and
5206 Attached
2 N/A N/A 2
1H The City of Bakersfield has two mixed-use zoning
districts that allow for residential development within areas that also accommodate commercial uses. The
Mixed-Use Neighborhood (MX-1) district encompasses
approximately 120 acres of zoned land and incorporates
Neighborhood Commercial (C-1) uses while allowing
multi-unit residential development by right. The Mixed-Use Transit (MX-2) district encompasses approximately 177 acres and incorporates Regional Commercial (C-2)
uses while allowing multi-unit residential development
by right.

Enacted BMC Chapter

17.12.020
BMC Chapter

17.12.020
1 N/A N/A 1
1I In 2024, the city updated its zoning ordinance to
promote greater residential development intensity by
reducing minimum parcel sizes, reducing minim parcel
area per dwelling unit, decreasing setbacks, and
reducing minimum distances between buildings in
residential zones. These amendments increase
development capacity and facilitate higher-intensity
residential development.

Enacted BMC Chapter

17.10.030
BMC Chapter

17.10.030
1 N/A N/A 1
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
1L Update zoning flexibility tools such as height averaging, shared parking, or reduced setbacks in exchange for
public benefits (e.g., affordable housing) to accelerate development.

Proposed Draft General Plan https://bakersfield204

5.com/
1 N/A N/A 1
2A Pursuant to BMC all residential housing in residential zones is ministerial if in compliance with development
standards. Projects that deviate from zoning and
development standards or exceed CEQA thresholds are
discretionary. All single-family zones are exempt from
site plan review. For multi-family, a site plan may only be denied if the proposed project does not comply with city codes, standards or policies, or CEQA.

Enacted BMC Chapters

17.10.030 and

17.08.080
BMC Chapter

17.10.030
BMC Chapter

17.08.080
3 N/A N/A 3
2B The city will have a newly adopted General Plan with a program level EIR that will streamline residential
development.

Proposed Adopted EIR General Plan Website 2 N/A N/A 2
2C The city regularly streamlines housing development at the project level by using CEQA statutory and
categorical exemptions.

Enacted CEQA Notices All CEQA exempt
projects in the city can
be found at the
CEQAnet portal:
https://ceqanet.lci.ca.
gov/
2 N/A N/A 2
2E Projects need only to be consistent with residential zoning standards (17.10.010) to bypass public hearing.

Enacted BMC Chapter

17.10.010-020
BMC Chapter

17.10.010
Ordinance 5217
2 N/A N/A 2
2F The city is currently updating the permit process to prioritize deed restricted affordable housing projects.

Modeled after the expedited residential solar program
the city will prepare an eligibility checklist, permit
process and inspection guide and requirements
bulletin.

Proposed N/A N/A 2 N/A N/A 2
2H The R-1 zone is not subject to design standards, while Ordinance 5156 established objective design standards
for multi-unit residential development in the R-2 through R-6, MX-1, and MX-2 zones. Together, these provisions
Enacted Ordinance 5156 Ordinance 5156
Attached
1 N/A N/A 1
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
reduce or eliminate subjective design review and
improve approval certainty for residential development. 2I Established new One-Stop Shop model for developers,
combining staff from various departments and
development process steps into a single location;
includes assigned dedicated staff member to guide
applicants along the way and ensuring each application
is routed in a timely manner and additional on-site Fire Prevention Services coordination.

Enacted Press Release Press Release
attached
1 N/A N/A 1
2J To reduce processing time, all ADUs proposed in R-1
zones go straight to building permit where the assigned staff reviews for code compliance. Previously, the
applicant had to go through the SPR process with
planning before it went to building, this reduces permit processing and costs for the applicant.

Additionally, the city utilizes ProjectDox, an electronic plan review platform, to facilitate the digital submission, review, and processing of plans associated with
development and permitting activities. ProjectDox
provides applicants and City staff with a centralized
electronic environment for managing plan review,
replacing processes that would otherwise rely on
physical plan sets and manual exchange of documents.

ProjectDox is used to improve coordination between
permit applicants and the City departments and staff
responsible for reviewing submitted plans.

Enacted Email
BMC Chapter

17.65.030
Building
Department FAQ
ProjectDox
Summary
BMC Chapter

17.65.030
Email, Building
Department FAQ, and
ProjectDox Summary
Attached
1 N/A N/A 1
2K The city utilizes the Clariti online permitting system establishing a standardized online application portal for all entitlements and permits. The centralized platform
provides applicants with a consistent application
Enacted Online https://bakersfield.my
.site.com/s/login/?ec=
302&startURL=%2Fs
%2F
1 N/A N/A 1
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
process, electronic document submission, and
application tracking.
2L The City of Bakersfield maintains a documented
practice of publicly posting monthly building permit
summary reports on its website. These reports provide
permit approval information by project type, including
residential, multifamily, accessory dwelling units, and commercial development, and include monthly and
year-to-date permit totals and valuations. The reports
promote transparency by providing the public with
regular updates on permitting activity and development
approvals.

Enacted Online https://www.bakersfie
ldcity.us/building-division
1 N/A N/A 1
3D The City established the Bakersfield Community Land
Trust (BCLT) to accelerate affordable homeownership
through the community land trust model, an innovative
form of community ownership specifically recognized by
HCD. BCLT provides permanently affordable
homeownership opportunities by retaining ownership of
the underlying land while allowing qualified first-time homebuyers to purchase the home, reducing
development and housing costs while preserving long-term affordability.

Enacted
Resolution No.
145-2023 –
Establishing BCLT
Agreement No.
2024-305 – Self
Help Enterprises
ARPA Funding
Agreement
Resolution No.

CLT003-2024 –
Self Help
Enterprises
Contract
BCLT Website
https://www.bakersfie
ldcity.us/bakersfield-community-land-trust
Resolution No. 145-
2023, Agreement No.
2024-305, Resolution
No. CLT003-2024
Attached
1 N/A N/A 1
3E The City of Bakersfield uses public funding through its Capital Improvement Program (CIP) to construct and
improve transportation infrastructure that supports
walking, bicycling, transit access, and other alternatives Enacted City CIPs for the
last three years.

CIP Project List
Attached
1 N/A N/A 1
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
to automobile travel. In recent years, the City’s invested in multimodal corridors, pedestrian and bicycle
infrastructure, traffic calming, Safe Routes to School
improvements, and related streetscape improvements.

By allocating public funds to these projects, the City
reduces the transportation-infrastructure costs that
would otherwise be brought about by individual
development projects.
4A The city passed the Public Safety and Vital Services measure that increased sales tax revenue by 1%. Since
2019 a regular allocation of PSVS measure funds has
been added to our Affordable Housing Trust Fund.

Enacted PSVS measure https://www.bakersfie
ldcity.us/public-safety-vital-services-measure
2 N/A N/A 2
4B The city established the Bakersfield Affordable Housing Trust Fund in 2020. Since establishment the city has
contributed annually and has received two matches
from the LHTF state program. There have been
significant contributions that total over $25 million in local funding.

Enacted Resolution No.
124-2021 –
Resolution
establishing
Bakersfield’s
AHTF
State Match
Agreements
Resolution No. 124-
2021 Attached
State Match
Agreements Attached
2 N/A N/A 2
4C The city is a HUD entitlement city and gets an annual allocation of HOME funds that can be used for
preservation, also local and state funds (PHLA, LHTF)
can be used for preservation. Since 2018 the city has
preserved 319 affordable units.

Enacted NOFAs, funding
agreements
Attached 2 N/A N/A 2
4D The City of Bakersfield Code Enforcement Unit
conducted a search for unpermitted construction and
discovered over 100 illegal structures within the
community’s disadvantaged neighborhoods providing
habitation. Many structures posed substantial life and
safety risks to the residents. The city is providing low interest loans to permit and repair the illegal structures for the creation of safe, decent ADU housing.

Enacted ADU Program
NOFA
Attached 2 N/A N/A 2
City of Bakersfield Self-Scoring Sheet
Category
Number
Concise Written Description of Prohousing Policy Enacted or
Proposed
Documentation
Type (e.g.,
resolution,
zoning code)
Insert Web Links to
Documents or
Indicate that
Electronic Copies
are Attached as
Appendix 7
Points Enhance
ment
Category
Number
Enhance
ment
Points
Total
Points
4G Since 2019 the city has funded over $25 million in
general local funds for affordable housing.

Enacted Notice of Funding
Availability 2019-
2026
Attached 2 N/A N/A 2
4H The city has residual redevelopment funds that it plans to direct to affordable housing. The City is preparing a reuse plan.

Proposed N/A N/A 1 N/A N/A 1
4I The city established the Bakersfield Affordable Housing Trust Fund in 2020 and releases an annual NOFA to
support affordable housing with local and state funds. A second NOFA is released that includes our annual
HOME entitlement. With both NOFAs the city has two
opportunities a year for developers to apply for
subsidies.

Enacted Notice of Funding
Availability 2019-
2026
Attached 1 N/A N/A 1
TOTAL 39
Sample Self-Scoring Sheet
Note: This is a Sample Self-Scoring Sheet; an actual submission may include more specificity when an applicant completes the “Concise Written Description of Prohousing Policy.” Category
Number
Concise Written
Description of
Prohousing Policy
Enacted or
Proposed
Documentation
Type (e.g.,
resolution, zoning
code)
Insert Web
Links to
Documents or
Indicate that
Electronic
Copies are
Attached as
Appendix 7
Points Enhancement
Category
Number
Enhancement
Points
Total Points
1B Permitted missing
middle housing uses by
allowing duplexes and
triplexes by right in
existing low-density,
single-family residential
zones beyond what is
required by SB 9.

E Zoning code Electronic
copy attached
3 6 1 4
1C Sufficient sites to
accommodate 131
percent of the current
RHNA with rezoning by
total or income
category.

P Resolution Electronic
copy attached
2 1 2 4
1D Density bonus program
exceeds statutory
requirements by 12
percent.

E Zoning code Electronic
copy attached
2 2
1F Eliminated parking
requirements for
residential development
as authorized by
Government Code
section 65852.2.

E Zoning code Electronic
copy attached
2 2
1G Zoning that that is
designed to increase
affordable housing for a
range of types and for
E Zoning code Electronic
copy attached
1 1 2 3
Category
Number
Concise Written
Description of
Prohousing Policy
Enacted or
Proposed
Documentation
Type (e.g.,
resolution, zoning
code)
Insert Web
Links to
Documents or
Indicate that
Electronic
Copies are
Attached as
Appendix 7
Points Enhancement
Category
Number
Enhancement
Points
Total Points
extremely low-income
households.
1H Modified development
standards/other
applicable zoning
provisions to allow for
residential uses in non-residential zones (light
industrial).

E Zoning code Electronic
copy attached
1 1 2 3
1L Other zoning and land
use actions that
measurably support the
Acceleration of Housing
Production.

P Resolution Electronic
copy attached
1 1
2B Streamlined program-level CEQA analysis
and certification of
general plans,
community plans,
specific plans with
accompanying
Environmental Impact
Reports (EIR), and
related documents.

E Zoning code Electronic
copy attached
2 2
2G Consolidated permit
processes that
minimize the levels of
review and approval
required for projects.

E Zoning code Electronic
copy attached
1 1
2I Established a one-stop-shop permitting
process.

P Resolution Electronic
copy attached
1 1 2 3
Category
Number
Concise Written
Description of
Prohousing Policy
Enacted or
Proposed
Documentation
Type (e.g.,
resolution, zoning
code)
Insert Web
Links to
Documents or
Indicate that
Electronic
Copies are
Attached as
Appendix 7
Points Enhancement
Category
Number
Enhancement
Points
Total Points
2N Other actions that
quantifiably decrease
production timeframes.

E Zoning code Electronic
copy attached
1 1
3A Waiver of residential
development impact
fees.

E Zoning code Electronic
copy attached
3 3
3B Adopted policies that
result in less restrictive
requirements than
Government Code
sections 65852.2 and
65852.22.

P Resolution Electronic
copy attached
2 1 2 4
3E Measures that reduce
costs for transportation-related infrastructure.

E Zoning code Electronic
copy attached
1 1
3I Other actions that
quantifiably reduce
construction or
development costs.

E Zoning code Electronic
copy attached
1 1
4A Local housing trust
funds.

E Zoning code Electronic
copy attached
2 2
4C Regular use of funding
for preserving assisted
units at-risk of
conversion to market-rate uses.

E Zoning code Electronic
copy attached
2 2 1 3
4E Establishes a program
that complies with the
Surplus Land Act and
offers below-market
land leases for
affordable housing.

E Zoning code 2 2
Category
Number
Concise Written
Description of
Prohousing Policy
Enacted or
Proposed
Documentation
Type (e.g.,
resolution, zoning
code)
Insert Web
Links to
Documents or
Indicate that
Electronic
Copies are
Attached as
Appendix 7
Points Enhancement
Category
Number
Enhancement
Points
Total Points
4G Prioritization of local
general funds for
affordable housing.

E Zoning code 2 2
4M Other actions that
leverage financial
resources for housing.

E Zoning code 1 1
TOTAL 33 12 45
Appendix 4: Examples of Prohousing Policies with Enhancement Factors If a Prohousing Policy incorporates any of the enhancement factors specified in the Scoring Criteria Enhancement Factors chart, it will receive extra points as indicated therein. Examples of such qualifying Prohousing Policies include the following:

Category 1: Favorable Zoning and Land Use
• Rezoning sufficient sites to accommodate 150 percent or greater of the Regional Housing Needs Allocation by total or income category, including sites in Location Efficient Communities.
• Rezoning sufficient sites to accommodate 150 percent or greater of the Regional Housing Needs Allocation by total or income category, including sites in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Rezoning to accommodate 125 to 149 percent of the Regional Housing Needs Allocation in downtown commercial corridors or other infill locations. • Expanding density bonus programs to exceed statutory requirements by 10 percent or more in Location Efficient Communities.
• Reducing or eliminating parking requirements for residential development as authorized by Government Code section 65852.2 in Location Efficient Communities. • Increasing allowable density in low-density, single-family residential areas beyond the requirements of state Accessory Dwelling Unit Law in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Modification of development standards and other applicable zoning provisions to promote greater development intensity in downtown commercial corridors or other infill locations.
• Coupling rezoning actions with policies that go beyond state law requirements in reducing displacement of lower-income households and conserving existing housing stock that is affordable to lower-income households.

Category 2: Acceleration of Housing Production Timeframes • Ministerial approval processes for multifamily housing in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Streamlined, program-level CEQA analysis and certification of specific plans in Location Efficient Communities.
• Documented practice of streamlining housing development at the project level in downtown commercial corridors and other infill locations. • Expedited permit processing for housing affordable to lower-income households in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).

Category 3: Reduction of Construction and Development Costs • Fee waivers for affordable housing in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps). • Fee waivers or reductions for higher density housing in downtown commercial corridors or other infill locations.
• Measures that reduce costs and leverage financial resources for transportation-related infrastructure or programs in Low Resource and High Segregation & Poverty areas (as designated in the most recently updated TCAC/HCD Opportunity Maps). • Adoption of universal design ordinances to increase housing choices and affordability for persons with disabilities in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps). • Permitting innovative housing types, such as manufactured homes, recreational vehicles or park models, in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).

Category 4: Providing Financial Subsidies
• Targeting local housing trust funds to acquisition or rehabilitation of existing affordable units, or to affordable units at risk of converting to market rate uses, in Low Resource and High Segregation & Poverty areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Marketing grants and other financial products for ADUs/JADUs in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Utilizing publicly owned land for affordable housing in High Resource and Highest Resource areas (as designated in the most recently updated TCAC/HCD Opportunity Maps).
• Establishment of an Enhanced Infrastructure Financing District or similar local financing tool in a Low Resource or High Segregation & Poverty area (as designated in the most recently updated TCAC/HCD Opportunity Maps). • Directing residual redevelopment funds or general funds to conservation or preservation of affordable housing in areas at high risk of displacement.

Appendix 5: Homeless Encampment Template
Subchapter 6.6 Prohousing Designation Program requires applicants to confirm that its treatment of encampments on public property complies with and will continue to comply with the constitutional rights of persons experiencing homelessness. An application must include a one-page summary demonstrating how the applicant has enacted best practices in their jurisdiction related to the treatment of unhoused individuals camping on public property, consistent with the United States Interagency Council on Homelessness’ “7 Principles for Addressing Encampments (June 17, 2022). The following template and certification are included to help jurisdictions meet this threshold.
• Principle 1: Establish a Cross-Agency, Multi-Sector Response to Encampments – Describe how system partners (name partners) work together to prioritize health and safety both for residents and unsheltered individuals. (350 characters max) System partners throughout Bakersfield work collaboratively to prioritize the health and safety of all residents regardless of housing status through coordinated outreach, service delivery, shelter access, and maintenance of safe and accessible public spaces.

The City of Bakersfield works closely with the Bakersfield-Kern Regional Homeless Collaborative (BKRHC), the County of Kern, service providers, and public safety partners to coordinate a comprehensive response to homelessness. Through participation on the BKRHC Executive and Governing Boards, City staff help align local resources, identify service gaps, and support a coordinated system of care that connects individuals experiencing homelessness to housing, shelter, healthcare, behavioral health services, and other supportive resources.

The City’s Community Development Division, through its Homeless Services Unit, administers homeless assistance programs, oversees provider contracts, and monitors performance outcomes to ensure resources are effectively deployed. The City also funds the Brundage Lane Navigation Center (BLNC), a low-barrier, referral-based shelter with more than 300 beds, providing a safe alternative to unsheltered homelessness while connecting participants to case management and housing-focused services.

The City also contracts with Flood Ministries to conduct street outreach, engage individuals experiencing homelessness, provide transportation, and facilitate connections to shelter and supportive services. This outreach-first approach helps address immediate health and safety concerns while encouraging long-term housing stability.

To maintain safe and accessible public spaces for our residents, the City coordinates efforts among the Bakersfield Police Department’s Community Vitaliy Unit, Park Ranger Program, and Code Enforcement Rapid Response Teams. These teams respond to non-emergency homelessness-related concerns, address encampments, and work alongside outreach providers to ensure individuals are offered available services and shelter resources whenever possible. This coordinated approach balances public health and safety needs for residents while treating individuals experiencing homelessness with dignity and connecting them to appropriate assistance.

Together these partnerships create a coordinated regional response that promotes community well-being, improves quality of life, and supports pathways from homelessness to permanent housing.

Attachments: Agr.22-237, City of Bakersfield’s Homelessness Hub Website • Principle 2: Engage Encampment Residents to Develop Solutions – Describe street outreach efforts to engage with encampment residents to find alternative shelter, housing, and service options using the housing first approach before an existing encampment is closed. (350 characters max)
Before an encampment closure, the city coordinates with Flood Ministries, Park Rangers, Code Enforcement, and other partners to engage residents, assess individual needs, and identify available shelter, housing, and supportive service options. Outreach teams are notified of planned closures and conduct initial engagement within the first 24 to 72 hours, providing notice, completing needs assessments, and offering immediate assistance. Staff maintain a continued presence through the remaining notice period to follow up with individuals who are interested in placement or require additional support.

Using a person-centered, Housing First approach, outreach workers build rapport through motivational interviewing and ongoing contact rather than relying on a single interaction. Individuals may be offered shelter or housing referrals, transportation, storage for belongings, behavioral or physical health services, legal assistance, and Homeward Bound services. Outreach staff also consider barriers and individual circumstances, including medical needs, pets, vehicles, personal preferences, and willingness or ability to enter congregate shelter.

The City’s encampment procedures provide time between notice and abatement so outreach workers can contact residents, arrange services, and pursue appropriate placement options before closure. When an immediate permanent housing option is not available, individuals continue to receive case management and support intended to help them transition from temporary shelter to the housing option that best meets their needs.

Attachments: Street Outreach Engagement Procedure (Encampments), Encampment Engagement Process (FINAL), Principle Doc, Encampment Policy - City • Principle 3: Conduct Comprehensive and Coordinated Outreach – Describe multidisciplinary connection strategies and linkages to resources and permanent housing solutions that is customized to individual needs. If applicable, describe how the jurisdiction uses the coordinated entry system to connect individuals to resources and permanent housing. (350 characters max)
The City uses a multidisciplinary, person-centered approach that brings together Flood Ministries, Park Rangers, Code Enforcement, the Bakersfield Police Department, behavioral and physical health providers, shelters, and other community partners. Outreach workers assess each person’s circumstances and barriers, including health or behavioral health needs, disabilities, pets, vehicles, family connections, personal preferences, and willingness or ability to enter congregate shelter. Based on that assessment, individuals are connected to appropriate resources such as emergency or low-barrier shelter, transportation, storage for belongings, medical and mental health care, legal assistance, safe parking or camping options, and Homeward Bound family-reunification services.

Outreach staff use motivational interviewing, rapport-building, repeated engagement, and ongoing case management rather than relying on only a single contact. They maintain caseloads, document services offered and barriers identified and follow up as shelter or housing opportunities become available.

Attachments: Encampment Engagement Process (FINAL), Principal Doc, Street Outreach Engagement Procedure (Encampments)
• Principle 4: Address Basic Needs and Provide Storage – Describe efforts to meet basic needs, health, safety, and access to storage (timeframes) for people experiencing unsheltered homelessness while creating clear pathways to permanent housing. (350 characters max)
The City of Bakersfield, working with system partners, focuses on meeting the immediate needs of people experiencing unsheltered homelessness while also connecting them to long‑term, permanent housing. Under Flood Ministries’ Engagement Protocol, outreach staff are instructed to offer immediate services within the first 24 to 72 hours of initial encampment engagement prior to an encampment sweep. Outreach staff also offer housing and shelter referrals, transportation, storage for belongings, and mental health or medical services if needed.

During an encampment closure, individuals are given notice and an opportunity to gather their belongings. Personal property taken into safekeeping is documented and stored for at least 30 days, during which it may be reclaimed.

These immediate services and protections are paired with continued shelter and housing referrals, individualized support, and follow-up intended to create a clear pathway from unsheltered homelessness to stable, permanent housing.

Attachments: Encampment Engagement Process (FINAL), Encampment Policy – City, Seizure Policy - City
• Principle 5: Ensure Access to Shelter or Housing Options – Describe how low barrier resources to housing and supportive services are communicated to encampment residents. Include how strategies involve alternative measures to criminalization, focusing on service engagement and harm reduction. (350 characters max) The City of Bakersfield communicates low-barrier housing and supportive service options through direct, repeated outreach before and during encampment engagement. Flood Ministries and other outreach partners approach residents in person, explain available options, assess individual needs and barriers, and provide verbal information and referrals for shelter, housing, transportation, storage, medical and behavioral health care, legal assistance, and family-reunification services. Outreach staff continue following up throughout the notice period and maintain contact with individuals as additional shelter or housing opportunities become available.

The City’s strategy prioritizes service engagement over criminalization. Outreach workers use trauma-informed practices, motivational interviewing, rapport-building, and harm-reduction techniques to meet individuals where they are and encourage voluntary participation in services. Park Rangers and other City staff coordinate with outreach providers and focus on connecting individuals to resources rather than penalizing them solely for being unhoused. Individual circumstances—including health needs, pets, vehicles, personal preferences, and willingness or ability to enter shelter—are considered when identifying appropriate alternatives.

When an encampment must be closed, residents are given advance notice and time to work with outreach providers, gather belongings, and consider available shelter or housing options. This approach seeks to reduce displacement-related harm, preserve dignity, and create a practical pathway from unsheltered homelessness to stable housing.

Attachments: Encampment Engagement Process (FINAL), Principle Doc, Street Outreach Engagement Procedure (Encampments)
• Principle 6: Develop Pathways to Permanent Housing and Supports – Describe Housing First strategies emphasizing low barriers, a harm-reduction model, and services to support people obtaining permanent housing more efficiently. Identify efforts to align federal, state, and local funding/programs to provide clear pathways to permanent housing. (350 characters max)
The City of Bakersfield applies Housing First principles by connecting people experiencing homelessness to shelter and housing without requiring treatment, sobriety, or participation in other services as a condition of assistance. Park Rangers, Flood Ministries, and other partners use repeated outreach and individualized assessments to identify barriers such as pets, vehicles, disabilities, mental health or substance-use needs, and housing preferences. Individuals are then connected to the most appropriate available option, including low-barrier shelter, safe parking or camping, supportive services, and permanent housing opportunities.

The City’s approach also emphasizes harm reduction, dignity, and voluntary service engagement. Flood Ministries use trauma-informed outreach, motivational interviewing, rapport-building, transportation assistance, storage support, and referrals to medical, behavioral health, and legal services. Outreach staff maintain caseloads and continue following up with individuals who are awaiting placement, helping reduce disruptions and move people toward housing more efficiently.

Federal, state, regional, and local resources are coordinated through the Bakersfield-Kern Regional Homeless Collaborative and the regional Continuum of Care. State Homeless Housing, Assistance and Prevention funding supports the City’s contract with Flood Ministries and requires funded housing activities to align with the core components of Housing First. The city also contributes local resources to programs such as the Brundage Lane Navigation Center and Homeward Bound, while regional partners connect individuals to federally and state-supported shelter, benefits, supportive services, and permanent housing programs. Client and service information is tracked through the regional Homeless Management Information System to support coordination, reduce duplication, and create a clearer pathway from street outreach to permanent housing.

Attachments: Street Outreach Engagement Procedure (Encampments), Agr.22- 237
• Principle 7: Create a Plan for What Will Happen to Encampment Sites After Closure – Describe plans for former encampment spaces (long-term solutions to prevent encampments from reoccurring). Include efforts to emphasize safety, accessibility, and inclusivity that improve infrastructure. Example: Communities can include curb cuts to increase mobility access and enhanced lighting to encourage safety. (350 characters max) Following encampment closures, the City works to restore the site to a safe, clean, accessible, and usable condition while addressing factors that may contribute to encampments reoccurring. Park Rangers, Code Enforcement, Solid Waste, and other departments coordinate the removal of debris and health or safety hazards, document site conditions before and after cleanup, and continue monitoring locations through regular patrols, complaint-response systems, and follow-up visits.

Flood Ministries also return to sites to engage individuals who may have been missing or have returned and continue case management for people connected to shelter, services, or housing. All property seized is kept by Code Enforcement until the owner can retrieve it.

Long-term strategies are evaluated based on the location and its intended public use. Where appropriate, the City may consider environmental and infrastructure improvements such as repairing damaged facilities, restoring landscaping, improving visibility and lighting, maintaining accessible sidewalks and pathways, and addressing conditions that obstruct mobility or create isolated areas.

Improvements would be designed to preserve ADA access and make public spaces safer and more welcoming for people of all ages and abilities.

The City’s approach emphasizes active and inclusive use of former encampments rather than relying solely on enforcement or physical barriers. Continued maintenance, outreach, monitoring, and site-specific improvements are paired with connections to shelter and permanent housing so that encampments are not simply displaced to another location. This coordinated approach supports the long-term restoration of public spaces while addressing the housing and service needs that contribute to unsheltered homelessness.

Attachments: Chapter 15 – City’s Operating Policy on Public Encampments, Street Outreach Engagement Procedure & Chapter 16 - Property Seizure Policy Certification and Authorization:

Signature of Authorized Representative Date
Appendix 6: Public Participation Checklist
Pursuant to Sections 6601, 6602, and 6605, applicants are required to demonstrate how they have engaged in a “Diligent Public Participation Process.” Please complete this checklist, and sign, to confirm that the applicant has complied with this requirement. Attach and reference any comments you received during the process.

Regulation Text Explanation Yes No
Outreach through a
variety of methods and
languages to ensure
access to the public
process and provide
opportunities for public
input.

Applicant should use methods such as newspaper
ads, email, social media, fliers, etc., to inform the
public that an application has been drafted and
posted for public comment. Language access
should reflect languages spoken in your local
community and should be available in multiple
languages in print media or upon request for digital
media.
☐ ☐
Specific effort to engage
all segments of the
community, including
individuals or
representatives of lower-income and special
needs households, for-profit and non-profit
developers, and special
needs service providers.

Individuals and organizations representing lower-income and special needs households, for-profit and non-profit developers, and special needs
service providers should be engaged, informed of,
and offered an opportunity to comment on the
application. Outreach lists utilized for Housing
Element compliance would suffice.
☐ ☐
Availability of the draft
document to the public,
including notification to
interested parties and all
segments of the
community, for thirty (30)
calendar days and
subsequent versions for
seven (7) calendar days.

Applicants should post the application in print and
digital forms, collect comments, and incorporate
those comments into the application if necessary.

Making the application available to the public could
be satisfied by posting the application online and/or
announcements through other mediums (e.g., local
newspapers) so long as these forums include
diverse segments of the community, including
individuals or representatives of lower-income and
special needs households, for-profit and non-profit
developers, and special needs service providers.
☐ ☐
Public hearings and
informative meetings.

For the purposes of satisfying this requirement, a
City Council or Board of Supervisors meeting
informing the public of the jurisdiction's intent to
submit a Prohousing Designation Program
application, in addition to any subsequent meetings
necessary to make revisions in response to public
comment, will satisfy this requirement.
☐ ☐
Consideration of
comments, including
incorporation of
comments into a
jurisdiction's application
and Prohousing Policies
as appropriate.

Provide all comments received with a description
of how the comment was incorporated into the
application. If the comment is not appropriate for
incorporation, please describe why.
☐ ☐
Certification and Authorization:

Signature of Authorized Representative Date
Appendix 7: Additional Information and Supporting Documentation See documents located here:
https://repo.bakersfieldcity.us/url/sbriciau5ipiz2bf

ADMINISTRATIVE REPORT
MEETING DATE: November 4, 2026 AGENDA CATEGORY: Consent - Hearings TO: Honorable Mayor and City Council
FROM: Phillip Burns, Development Services Director
DATE: October 30, 2026
SUBJECT: General Plan Amendment No. 23-0001
Public hearing to consider the Planning Commission’s approval of General Plan Amendment No. 23-0001 and its proposed Environmental Impact Report (EIR). (Ward 4) Coffee Road Ventures, LLC is proposing a General Plan Amendment, adoption of California Environmental Quality Act (CEQA) Section 15091 Findings, CEQA Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certification of the Final Environmental Impact Report on approximately 46.16 acres located on the southwest corner of Rosedale Highway and Coffee Road. The request includes:

1. Resolution certifying the Final Environmental Impact Report (FEIR) pursuant to the California Environmental Quality Act (CEQA) Section 15091 Findings, Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program.

2. Resolution adopting a General Plan Amendment to change the land use designation from P (Public Facilities) to LI (Light Industrial).

RECOMMENDATION:

Staff and the Planning Commission recommend adoption of the resolutions.

BACKGROUND:

The project is a request for an amendment to change the land use designation from P (Public Facilities) to LI (Light Industrial), intended for consistency with the existing M-2 (General Manufacturing) zone, to adopt California Environmental Quality Act (CEQA) Section 15091 Findings, CEQA Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certify the Final Environmental Impact Report to facilitate the development of the Riverview Marketplace, a 405,531- square-foot commercial retail center.

Project Summary
The General Plan Amendment (“GPA”) request submitted by Coffee Road Ventures, LLC (applicant and property owner) is proposing a GPA to change the Land Use Element of the Metropolitan Bakersfield General Plan land use designation from P (Public Facilities) to LI (Light Industrial), or a more restrictive designation on approximately 46.16 acres located on the southwest corner of Rosedale Highway and Coffee Road, in northwest Bakersfield [Assessor’s Parcel Number (APN) 368-010-40].

The Riverview Market Commercial Project (Project) will involve the construction and operation of the Riverview Marketplace, a commercial retail center that would encompass approximately 405,531 square feet of total building space, located on an approximately 46.16- acre parcel (Project Site). The Project Site is situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.

The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thru, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements.

Site History
• October 23, 1985 – City Council approved the annexation of the project site to the City of Bakersfield as part of Annexation No. 307 Rancho LaBorde (Resolution No. 135-85) • October 31, 2025 – City staff circulated for a 32-day public review period a Notice of Preparation (NOP) after determining an environmental impact report is required for the General Plan Amendment No. 23-0001 and Site Plan Review No. 22-0223 (State Clearinghouse No. 2025101507).
• November 20, 2025 – City staff held an EIR Scoping Meeting to solicit input and written comments from agencies and the public on environmental issues or alternatives to be addressed in the Draft EIR.
• July 10, 2026 – A Notice of Availability (NOA) of a Draft Environmental Impact Report was published in the Bakersfield Californian newspaper, sent to agencies, organizations, and interested parties, and posted on the City’s website of a Draft EIR (DEIR; State Clearinghouse No. 2025101507) for the project for a 47-day review period to conclude on July 10, 2026, which was extended to conclude on August 26, 2026.
• October 1, 2026 – Bakersfield Planning Commission heard and took testimony from staff, the project applicant, public support, and opposition for the proposed project. The commissioners voted in favor of the project with a recommendation of approval of the General Plan Amendment, certification of the Environmental Impact Report, and adoption of the Facts and Findings and Statement of Overriding Considerations.

Site Plan Review:

If the project is approved, a Site Plan Review is required for all projects in the M-2 zone district. Pursuant to the Bakersfield Municipal Code (BMC) Section 17.08.060, no person shall undertake, conduct, use or construct any change in the actual use of land or improvements which requires a building permit without first obtaining site plan approval. The application for site plan approval is reviewed by the Site Plan Review (SPR) Committee which is established and consists of the Planning Director, Building Director, Fire Chief, and Public Works Director, or their designated representatives. The Development Services Director may then approve, conditionally approve, or deny the site plan. There is no requirement for Planning Commission consideration unless the Director’s Decision is appealed.

Environmental Review and Determination
Pursuant to the California Environmental Quality Act (CEQA), the City of Bakersfield is the Lead Agency for the proposed Riverview Marketplace Commercial Project (Project). A Draft Environmental Impact Report (DEIR) was prepared to evaluate the potential environmental impacts associated with implementation of the Project. The DEIR, State Clearinghouse No. 2025101507, was prepared in conformance with CEQA and the CEQA Guidelines and is intended to disclose information to the public and decisionmakers regarding the potential environmental effects of the Project. The DEIR does not recommend either approval or denial of the Project; rather, it provides an independent and impartial analysis of the foreseeable environmental impacts associated with the proposed course of action.

In accordance with CEQA Guidelines Section 15082, the City of Bakersfield filed a Notice of Preparation (NOP) with the Governor's Office of Planning and Research, State Clearinghouse, and distributed the NOP to responsible and trustee agencies, other affected agencies, and interested parties to solicit input regarding the scope and content of the EIR. Comments received during the NOP process identified potential concerns related to construction and operational air quality emissions, biological resources, cultural and Tribal cultural resources, and blight.

In addition, the Lead Agency held a publicly noticed EIR Scoping Meeting on November 20, 2025, at the City of Bakersfield City Hall Council Chambers. At the Scoping Meeting, information was provided about the proposed Project and the intended scope of the EIR, and the opportunity was provided for public agencies and members of the public to comment on the scope of environmental issues to be addressed in this EIR. No comments were received at the Scoping Meeting. Refer to the DEIR, Appendix A, for the NOP presentation and comment letters received.

Based on the analysis contained in the comments received in response to the NOP, a Notice of Availability (NOA) and DEIR were prepared for the Project in accordance with CEQA. The NOA/DEIR was circulated for a 45-day public and agency review period from July 10, 2026, to August 24, 2026, but was extended to August 26, 2026, due to delays in posting with the State Clearinghouse (DEIR: State Clearinghouse No. 2025101507). The DEIR, including its technical appendices, was also made available for review at the City of Bakersfield Development Services Department, Planning Division, and online through the City's Environmental Documents webpage. In response, the City received a total of six (6) comment letters from two state agencies, one law firm, one special interest group, and two public commenters. Please refer to the Final Environmental Impact Report (FEIR) for the comment letters, a summary of the comments, and Lead Agency responses.

Comments. The six comment letters generally focused on the adequacy of the DEIR’s analysis and mitigation. The main issues raised were air quality and health risks, biological resources, traffic and circulation, greenhouse gas emissions, cumulative impacts, and infrastructure. Several commenters requested additional analysis or stronger mitigation, particularly for operational air quality, sensitive species, fuel station traffic and queuing, and climate-related impacts. The agency comments also emphasized compliance with applicable regulatory requirements and coordination with the appropriate agencies. The six comment letters received are as listed herein: Adams, Broadwell, Joseph, and Cardozo on behalf of Californians Allied for a Responsible Economy (“CARE CA”); Jaco Oil Company; Brian Cypher; the California Department of Fish and Wildlife; the Sierra Club; and the San Joaquin Central Valley Air District.

Environmental Conclusion. As required by CEQA, the EIR includes appropriate review, analysis, and mitigation measures for the environmental impacts of the proposed project. The EIR has been prepared in accordance with CEQA Guidelines for certification. If the project were to be approved, a Statement of Facts and Findings, a Statement of Overriding Considerations, and a Mitigation Monitoring Program must also be adopted. The Statement of Overriding Considerations finds the benefits of the Project outweigh the impacts of greenhouse gas (GHG) and vehicle miles traveled (VMT) impacts that could not be reduced to less than significant levels. If certified, the EIR could be utilized by other permitting agencies in their capacity as Responsible and Trustee agencies under CEQA. As required by Departmental procedures for processing an EIR, the applicant has executed an indemnification agreement. Following completion of the public review process and preparation of responses to comments, a Final EIR has been prepared for consideration by the City's decision-making bodies. The Final EIR, together with the DEIR, responses to comments, Mitigation Monitoring and Reporting Program (MMRP), and other supporting information, will provide the environmental record for consideration of certification of the EIR and the requested Project approvals.

Public Notification:

Public notice for the proposed project and environmental determination was advertised in The Bakersfield Californian and posted on the bulletin board in City Hall North, 1600 Truxtun Avenue, Bakersfield, California. All property owners within 300 feet of the project site were notified by United States Postal Service mail regarding this public hearing in accordance with city ordinance and state law.

Comments Received. As of this writing, no comments have been received.

Tribal Consultation. In accordance with Senate Bill (SB) 18 and Assembly Bill (AB) 52, a letter was sent by staff on March 26, 2026, to inform the American Tribes about the proposed project and its site location.

This notification marks the consultation period mandated by SB 18 and AB 52. At present, no request for tribal consultation has been received.

Planning Commission Action:

The project was considered by the Planning Commission on October 1, 2026. One individual on behalf of CARE CA agency was present at the hearing and opposed the request. The Planning Commission recommended approval of the project to the City Council by a 5-0 vote with; two Commissioners absent.

The Planning Commission’s findings are contained in Resolution Nos. 62-26, 63-26, and 64-26.

Conclusions:

Consistency with General Plan and Zoning Ordinance. Consistency with Surrounding Development. The project would provide increased access to commercial services.

Consistency with General Plan/Zoning Ordinance. The proposal is consistent with land use goals and policies as contained in the General Plan related to commercial development, as noted above. Should the applicant submit site development plans, they will be reviewed for compliance with requirements and regulations as set forth in the Bakersfield Municipal Code Title 17 (Zoning Ordinance) and City Development Standards.

Overall Recommendation. The project has been found to be consistent with General Plan policies and City Zoning Ordinance requirements. For these reasons, City staff and the Planning Commission recommend approval of General Plan Amendment No. 23-0001 by: (1) Adopting resolution adopting California Environmental Quality Act Guidelines Section 15091 Findings of Fact, Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certifying the Environmental Impact Report; (2) Adopting resolution amending the land use designation from P (Public Facilities) to LI (Light Industrial) on 46.16 acres.

FISCAL IMPACT:

If this site develops to its full land use economic potential, it will have a positive impact on generating revenue for the City General Fund.

COUNCIL GOAL:

Economic Opportunity for All
ATTACHMENTS:

1. Maps
• Aerial
• Zoning
• Land Use

2. Conceptual Site Plan

3. Environmental Resolution
• EEQA Exhibits

4. Land Use Resolution
• GPA Exhibit

5. Response to Comments

6. Planning Commission Resolutions
• Environmental Resolution
• Land Use Resolution

7. Planning Commission Staff Report

8. Riverview Marketplace Draft Environmental Impact Report (DEIR)

9. Riverview Marketplace Final Environmental Impact Report (FEIR)

10. Statement of Overriding Considerations and Statement of Facts and Findings for Riverview Marketplace Project General Plan Amendment No. 23-0001

M-2 A
M-2
M-2
M-1
M-1
C-2/P.C.D.

P.C.D.

P.C.D.

P.C.D.

P.C.D.

R-1
R-1
R-1
R-2
R-2
R-2
R-2
R-2
R-2
R-2
R-2
C-C/P.C.D.

C-C/P.C.D.

M-2
M-2
A
M-2
M-2
M-1
M-2
R-1 R-1
M-2 C-2/P.C.D.

M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
M-2
OS
P.C.D.

P.C.D.

C-2
M-2
M-2
M-1
P.C.D.

P.C.D.

P.C.D.

P.C.D.

P.C.D.

P.C.D.

R-2
C-2
M-1
R-1
R-1 R-1
R-1
R-1
OS
R-1
R-1
R-1
R-2 R-2

JET WAY

ESPRESSO DR

CAPPUCCINO
WAY

LATTE LN

SILVERLAKE DR

HOODSPORT AVE
C
O
L
VIL
L
E
AV
E

STARSIDE DR

DELBERT ST
HENRY
LN
MOXEE
CT
N
E
A
H
B
AY
D
R

CAPE FLATTERY DR

EL TORO VIEJO RD

SEABECK AVE

SUNCRISP LN

JENNA KATHRYN DR
ODESSA
CT

ICICLE CREEK DR

WOLF RIVER AVE

KENNEWICK LN

TELSTAR
AVE

LOON CT

GREENBANK
ST

COURTLAND
AVE

CRISPIN ST
PIN
K
L
A
D
Y
W
A
Y

BELMAC AVE

HENRY LN

OLEO DR

ELZWORTH ST

STEAM CT

SEAVIEW DR

COFFEE FRONTAGE RD

SHOFNER AVE

LANGLEY RD

CHESAW CT

GREENACRES DR
MAX DR

MC INTOSH WAY

RIBSTON AVE

CHATTAROY ST

BOLERO AVE

CLAY PATRICK FARR WAY EL TORO VIEJO RD

GRANITE FALLS DR
COFFEE
RD

COFFEE RD

ROSEDALE HWY ROSEDALE HWY

GREENACRES
PARK
Fruitvale
Junior High
School
BaseEditor_MV
0 350 700
Feet
_
GPA 23-0001

CITY OF BAKERSFIELD
GPA 23-0001
FROM: P
TO: LI
CITY
COUNTY
Zoning
Commercial Zone Designations
C-2 Regional Commercial
C-2/P.C.D. Combining
C-C Combining
P.C.D. Planned Commercial
Development
Industrial Zone Designations
M-1 Light Manufacturing
M-2 General Manufacturing
Resource Zone Designations
A Agricultural
OS Open Space
Residential Zone Designations
R-1 One Family Dwelling
R-2 Limited Multiple Family
Dwelling Zone - 1 unit/2,500
sq. ft.

R-3/P.U.D. Combining
COUNTY
CITY

JET WAY

ESPRESSO DR

CAPPUCCINO
WAY

LATTE LN

SILVERLAKE DR

HOODSPORT AVE
C
O
L
VIL
L
E
AV
E

STARSIDE DR

DELBERT ST
HENRY
LN
MOXEE
CT
N
E
A
H
B
AY
D
R

CAPE FLATTERY DR

EL TORO VIEJO RD

SEABECK AVE

SUNCRISP LN

JENNA KATHRYN DR
ODESSA
CT

ICICLE CREEK DR

WOLF RIVER AVE

KENNEWICK LN

TELSTAR
AVE

LOON CT

GREENBANK
ST

COURTLAND
AVE

CRISPIN ST
PIN
K
L
A
D
Y
W
A
Y

BELMAC AVE

HENRY LN

OLEO DR

ELZWORTH ST

STEAM CT

SEAVIEW DR

COFFEE FRONTAGE RD

SHOFNER AVE

LANGLEY RD

CHESAW CT

GREENACRES DR
MAX DR

MC INTOSH WAY

RIBSTON AVE

CHATTAROY ST

BOLERO AVE

CLAY PATRICK FARR WAY EL TORO VIEJO RD

GRANITE FALLS DR
COFFEE
RD

COFFEE RD

ROSEDALE HWY ROSEDALE HWY
SI
SI
SI
MC
MC
MC
MC
MC
MC
P
LMR
LMR
LMR
LMR

LMR LMR
LMR
LMR
LMR
LMR
LMR

LMR LMR
LMR
LMR
LMR
HI

GC GC HI
SI
SI
GC
GC
HMR
LI
LMR/LR
LMR/LR
LMR/LR
OS-P
MUC
MUC
MUC
PS
MC
MC
LR
LR LR
ER
MUC
MUC
MUC
MUC
MUC
MUC
MUC
MUC
HI HI
SI
SI
SI
SI
SI
SI
SI
SI
SI
LI
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
GC
SI
SI
SI
SI
SI
SI
SI
SI
SI
SI
GC
GC
LI
LR LR
LR LR
LR
HMR
OS-P
LI
LI
LI
LI
LR
LR
LR
SI

GREENACRES
PARK
Fruitvale
Junior High
School
BaseEditor_MV
0 350 700
Feet
_
GPA 23-0001

CITY OF BAKERSFIELD
GPA 23-0001
FROM: P
TO: LI
CITY
COUNTY
Land Use

RESIDENTIAL
ER -Estate Residential: 1
dwelling unit/net acre
LMR - Low Medium Density
Residential: > 4 units but
≤ 10 dwelling units/net
acre
HMR - High Medium
Density Residential: >

7.26 units but ≤ 17.42
dwelling units/net acre
LMR/LR
LR - Low Density
Residential: ≤ 7.26
dwelling units/net acre

COMMERCIAL
GC - General Commercial
MUC - Mixed Use
Commercial
MC - Major Commercial

INDUSTRIAL

LI - LIGHT INDUSTRIAL
SI - Service Industrial
HI - Heavy Industrial

PUBLIC FACILITIES
P - Public Facilities
PS - Public/Private Schools

OPEN SPACE
OS-P - Parks and
Recreation
COUNTY
CITY
D
T
D
D
D
T
D
T
D
T T
T
T
D
D
D
D
D
S
S
S
S
S
S S
S
S
S 1.84 AC 1.55 AC 1.31 AC 1.36 AC0.94 AC 1.37 AC 1.72 AC 1.86 AC 1.46 AC 2.06 AC 0.32 AC 3.07 AC 1.40 AC 0.73 AC 1.70 AC 0.79 AC PARCEL 25 PARCEL 3 PARCEL 4 0.51 AC PARCEL 15 PARCEL 26 PARCEL 16 PARCEL 7 PARCEL 8 PARCEL 9 PARCEL 11 PARCEL 12 PARCEL 19 PARCEL 18 PARCEL 17 PARCEL 13 PARCEL 27 PROPOSED LEFT TURN POCKET EXISTING TRAFFIC SIGNAL 15 15 EXISTING TRAFFIC SIGNAL 1719 PARKING SURPLUS A 30 1014 5 5
6 20 20 16 18
1 1211
2 EXISTING TRAFFIC SIGNAL 21 18 18
6 9 22222323223740 ROSEDALE HIGHWAY PAD 3 DT COFFEE SHOP 760 SF NON-SPRINKLERED PAD 4 DT RESTAURANT 3,786 SF NON-SPRINKLERED PAD 5 DT/FAST CASUAL RESTAURANT 6,698 SF SPRINKLERED PAD 8 RETAIL 4,694 SF SPRINKLERED PAD 9 REST. 7,967 SF SPRINKLERED PAD 10 DT/FAST CASUAL REST./ RETAIL 10,110 SF SPRINKLERED PAD 11 DT REST/RETAIL. 11,719 SF SPRINKLERED PAD 13 RESTAURANT 6,533 SF SPRINKLERED PAD 14 REST/RETAIL 7,145 SF SPRINKLERED 14 PLAZA 14 141'-4" 238'-0"MAJOR B MARKET 34,971 SF SPRINKLERED DRIVE-THRU RESTAURANT ±2,740 S.F. 26 12 26 1 1542
7 1220 234625
7 COFFEE ROAD
60'-0" 167'-8"
8 9 1.21 AC PARCEL 10 0.88 AC PARCEL 6 21
4 10
54'-0" RETAIL ±3,028 S.F.
7 13
8 14
2 2121 12 23 18 3.31 AC 1.39 AC1.92 AC PARCEL 22 PARCEL 21 PARCEL 20 PAD 6 DT RESTAURANT 2,660 SF NON-SPRINKLERED 53'-8"
4 11 0.92AC PARCEL 24

STORAGE BLDG
(±500 UNITS)
±40,000 SF
SPRINKLERED FUEL CANOPY 20 DUAL SIDED DISPENSERSPAD 2 CAR WASH 4,100 SF PAD 1 DT /FAST CASUAL RESTAURANT 8,224 SF SPRINKLERED12 15 2.38 AC 1.54 AC PARCEL 28 1.01 AC PARCEL 1 DT. REST ±1,720 S.F. 62'-6" 14
4 7 25 14 RETAIL ±2,480 S.F. RETAIL ±2,500 S.F. RETAIL ±3,482 S.F. RETAIL ±2,665 S.F. RETAIL ±2,665 S.F. REST. ±1,844 S.F. RETAIL ±1,520 S.F. REST. ±1,794 S.F. RETAIL ±2,122 S.F. FAST CASUAL REST. ±1,229 S.F. RETAIL ±1,411 S.F. RETAIL ±1,452 S.F. RETAIL ±1,357 S.F. 14 1 16
9 8 PHASE 1 PHASE 2
6 10
55'-0" 124'-3" PARCEL 5
7 10 PATIO
5 45 DRIVE-THRU RESTAURANT ±2,496 S.F. DRIVE-THRU RESTAURANT ±2,296 S.F. FAST CASUAL RESTAURANTS ±4,226 S.F. 25 12 15 REST ±2,629 S.F. RETAIL ±2,243 S.F. 16 80'-0" 73'-11" PAD 7 RETAIL 4,694 SF SPRINKLERED 86'-11" 86'-11" 90'-0" 2 7
510
87 9 23 ON-GRADE LOADING PATIO MENU BOARD
100'-0" 100'-0"
100'-0" 201'-4" MAJOR C 8,000 SF SPRINKLERED MAJOR D 10,000 SF SPRINKLERED MAJOR I 20,612 SF SPRINKLERED MAJOR G 16,384 SF SPRINKLERED MAJOR H 17,324 SF SPRINKLERED 80'-0" MAJOR E 25,047 SF SPRINKLERED 180'-8" 115'-4" 93'-2" 93'-2" 110'-0" 134'-9" 162'-0" MAJOR J 25,000 SF SPRINKLERED 60'-11"145'-0" MAJOR F 18,012 SF SPRINKLERED 100'-0" 196'-0" 176'-0" 253'-4" 211515 CONTROLLER OFFICE 308 SF 47'-8" GROCERY TENANT AREA LIMIT FAST CASUAL RESTAURANT 2,874 S.F. FAST CASUAL RESTAURANT 2,677 S.F. 6 5 35 1
4 4 3 5 192'-0"
54'-0"
6 10 14 49
TRASH
REC. ORG.
1 1
7 7 7
1 1
7 7
1 10 2.43 AC PARCEL 14 34 22 10
8 10 175 244 85
8 77 GROCERY TENANT AREA LIMIT
STOP
STOP LANE 1 LANE 2

DO NOT ENTER
250 SF
510 SF
V 141'-0"
33'-6" 20 CAR VACUUM STALLS 1.74 AC PARCEL 2 PARCEL 27 GREASE BARREL TRASH REC. ORG.

REC.

ORG.

TRASH

GREASE BARREL
30'-0"
25'-0"
54'-0"
12'-0"
4 GREASE BARREL
TRASH
REC. ORG. PICK-UP EV EV EV EV PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP

DELIVERY DRIVER CARTS
TRASH
ORG.

REC. GREASE BARREL TRASH TRASH REC. ORG. GREASE BARREL TRASH TRASH REC. ORG. GREASE BARREL TRASH REC. ORG. GREASE BARREL TRASH REC. ORG. RETAIL ±2,137 S.F.

MCDELIVERY DRIVE THRU DRIVE THRU

PULL FORWARD
PULL FORWARD YOU THANK 68'-0"
14'-7" 87'-11"
25'-0"
25'-0" 30'-0" 22'-0"
25'-0"
TYP. 25'-0" 25'-0"
58'-5"
30'-0"
25'-0"
124'-3"
26'-10" 245'-2" 30'-0"
30'-0" 25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP. 28'-0" 44'-1" 38'-6" 30'-0"
25'-0" 30'-0" 30'-0"
25'-0"
30'-0"
35'-11" 30'-0"
36'-0" 25'-0" 30'-0"
25'-0" 25'-0" TYP.
30'-0"
18'-0"
18'-0" 30'-0" 11'-0" 30'-0"
25'-0"
7'-6" 30'-0"
12'-0"
8'-0" 12'-0"
25'-0" 25'-0" 25'-0" 25'-0"
40'-0" 20'-0"
24'-0"
TYP. 9'-0"
18'-0"
8'-0"
22'-8" 30'-0" 30'-0"
36'-0"
25'-0"
TYP.
62'-0"
7'-6" 12'-0" 58'-0" 20'-0" 56'-10" 61'-5"
43'-0" 26'-0"
36'-6"
29'-10" 16'-0" 30'-0" 42'-7"
30'-0" 30'-2"
21'-3" 30'-0" 24'-0" 10'-0" 30'-0"
30'-0"
30'-0"
13'-3" 25'-0"
9'-5" 25'-0" 25'-0"
20'-0"
25'-0"
30'-0" 25'-0" 46'-0" 25'-0"
12'-0" 12'-0"
25'-0"
54'-0"
40'-0"
24'-0"
TYP.
40'-0"
24'-0"
TYP. 6'-0" 9'-0" 5'-0"
7'-0"
12'-8"
23'-0"
25'-0" 25'-0" 36'-0" 25'-0" 45'-11"
25'-0" 45'-0" 12'-0"
12'-0" 44'-6"
84'-5"
20'-0"
TRASH
REC. ORG.
30'-0" 113'-0" 23 TRASH REC. ORG. 172'-5" TRASH REC. ORG. TRASH REC. ORG. TRASH REC. ORG. 10 28'-0"
8'-0" 8'-7" TRASH REC. ORG.6 35'-0" 2.33 AC PARCEL 23 1.21 AC PARCEL 10 148'-11" 7 61'-0" 14 22 DRIVE-THRU RESTAURANT ±2,505 S.F. RETAIL ±2,487 S.F. MEDICAL OFFICE ±4,004 S.F. 14 25'-0" 25'-0" 12'-0"
25'-0"PAD 12 MED. OFFICE /DT REST/RETAIL
9,129 SF SPRINKLERED TRASH REC. ORG.
8 30'-0" 18'-0" 36'-0"
TRASH
REC. ORG.
6 3434 TRASH REC. ORG. 50
80'-0"
60'-0"
6'-1" 18'-0"
7 60'-0" 30'-0" PLAZA
4 RETAIL /FAST CASUAL REST. ±2,400 S.F. RETAIL ±1,920 S.F. RETAIL ±2,400 S.F. RETAIL ±2,400 S.F. RETAIL /FAST CASUAL REST. ±2,400 S.F. RETAIL /FAST CASUAL REST. ±2,400 S.F. SHOPS 1 RETAIL 18,900 SF SPRINKLERED 29 18'-0"
30'-0" 36'-0" 25'-0" 36'-0" 25'-0" 36'-0" 25'-0"
11'-3" 18'-0" 131'-0"
47'-0"
60'-0" MAJOR G DEDICATED STALL MAJOR G DEDICATED STALL MAJOR G DEDICATED STALL MAJOR G DEDICATED STALL REC. ORG. TRASH TRASH GREASE BARREL 14 ON-GRADE LOADING ORG.

REC.

TRASH
GREASE BARREL 26
TRASH
REC.

ORG.

GREASE BARREL
REC.

ORG.

TRASH

GREASE BARREL
WRH1
ORG.

REC.

TRASH

GREASE BARREL
TRASH
REC.

ORG.

GREASE BARREL REC. ORG. TRASH GREASE BARREL FUTURE DETENTION BASIN #1 31,985 SF A3 A3 A3 A3 A2 A5 A3 A3 A3 A3 A3 A3 A2 59'-0"
18'-0" 7'-7" PATIO
7'-0"
18'-0" 130'-6"
R15'-0"
R15'-0"
8'-5"
15'-0" A4
25'-0" 7'-11" 19 19 14 SHOPS 2 RETAIL/FAST CASUAL REST. 7,575 SF SPRINKLERED 25'-0" 18'-0" 8'-0" 195'-0"
126'-3"

BARREL GREASE
ENCLOSURE TRASH REC. ORG. REC. ORG. TRASH TRASH GREASE BARREL GREASE BARREL ENCLOSURE TRASH REC. ORG. GREASE BARREL TRASH REC. ORG.

N
0PLAN ALTERNATIVES SP-49 Scale : 1" = 80' 40' 80' 160' 04.07.2026 A-1.1 NOTE: This information is conceptual in nature and is subject to adjustments pending further verification and Client, Tenant, andGovernmental Agency approvals. No warranties or guaranties ofany kind are given or implied by the Architect. DATE: MCG JOB #: DATE REVISIONS SWC ROSEDALE AND COFFEE 24.457.01 BAKERSFIELD, CA C MCG ARCHITECTURE 2026 ALL RIGHTS RESERVED AREA RESERVED FOR Y
S
T
A
M

P RIVERVIEW MARKETPLACE
N LOCATION PLAN N.T.S. PHASE 1 PHASE 2

Page 1 of 4 ends

RESOLUTION NO.

RESOLUTION OF THE BAKERSFIELD CITY COUNCIL CERTIFYING A FINAL ENVIRONMENTAL IMPACT REPORT, ADOPT SECTION 15091
FINDINGS; AND ADOPT MITIGATION MONITORING AND

REPORTING PROGRAM, FOR AN AMENDMENT TO THE LAND USE

MAP OF THE METROPOLITAN BAKERSFIELD GENERAL PLAN

GENERALLY LOCATED AT THE SOUTHWEST CORNER OF ROSEDALE
HIGHWAY AND COFFEE ROAD (2401 COFFEE ROAD) (GPA NO. 23- 0001).

WHEREAS, Coffee Road Ventures, LLC (property owner and applicant) is requesting approval of (1) General Plan Amendment (GPA) of the Land Use Element of the Metropolitan Bakersfield General Plan land use designation from P (Public Facilities) to LI (Light Industrial) or a more restrictive designation; and (2) approval of California Environmental Quality Act (CEQA) Section 15091 Findings, CEQA Section 15093 Statement of Overriding Considerations, Mitigation Monitoring and Reporting Program, and certification of a Final Environmental Impact Report for the Riverview Marketplace project on approximately 46.16 acres located at 2401 Coffee Road (southwest corner of Coffee Road and Rosedale Highway) shown in Exhibit C, to facilitate the development of a 405,531 square feet commercial retail center (the “Project”); and WHEREAS, it was determined that the Project would have a significant effect on the environment; therefore, an Environmental Impact Report was prepared in accordance with the California Environmental Quality Act (CEQA); and WHEREAS, the Draft Environmental Impact Report was circulated for a public review period from July 10, 2026, through August 26, 2026, in accordance with CEQA; and WHEREAS, the Planning Commission held a public hearing on October 1, 2026, where individuals provided testimony in support, and approved Resolution No. 64-26, which recommended that the City Council certify an Environmental Impact Report for the Project; and
WHEREAS, the Clerk of the City Council set Wednesday, November 4, 2026 at 5:15 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before the City Council to consider the proposed Environmental Impact Report as required by Government Code Section 65355, and notice of the public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and
WHEREAS, the laws and regulations relating to the preparation and certification of an Environmental Impact Report as set forth in CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been duly followed by City staff and the Planning Commission; and

Page 2 of 4 ends

WHEREAS, the Director of the Development Services Department (1715 Chester Avenue, Bakersfield, California) is the custodian of all documents and other material upon which the environmental determination is based; and WHEREAS, during the hearing, the City Council considered all facts, testimony, and evidence concerning the Project, including the Administrative Report, and the Planning Commission’s deliberation and action.

WHEREAS, in accordance with CEQA Guidelines Section 15090 the Lead Agency (City of Bakersfield) shall certify that:

1. The Final EIR has been completed in compliance with CEQA; and

2. The Final EIR was presented to the decision-making body of the Lead Agency and that the decision-making body reviewed and considered the information contained in the Final EIR prior to approving the project; and

3. The Final EIR reflects the Lead Agency’s independent judgment and analysis; and
WHEREAS, the Statement of Facts and Findings support the mitigation measures to reduce significant impacts to less than significant levels, and WHEREAS, the Statement of Overriding Considerations recognizes that significant and unavoidable impacts for Greenhouse Gas (GHG)and Vehicle Miles Travel (VMT) would result from implementation of the Project; and
WHEREAS,, adoption of the Statement of Overriding Considerations for GHG and VMT finds that the benefits of the Project outweigh the Project’s significant and unavoidable impacts, outweigh and override the significant unavoidable impacts; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above-referenced public hearing support the following findings:

1. All required public notices have been given. Hearing notices regarding the Project were mailed to property owners within 300 feet of the Project area and published in the Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing.

2. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA.

3. An Environmental Impact Report for the Project is the appropriate environmental document to accompany its approval, as the Project will significantly impact the physical environment.

Page 3 of 4 ends

NOW, THEREFORE, BE IT RESOLVED by the Bakersfield City Council as follows:

1. The above recitals, incorporated herein, are true andcorrect.

2. The City Council has considered and concurs with the findings made by the Planning Commission set forth in Resolution No. 64-26 approved on October 1, 2026.

3. The Environmental Impact Report for the Project is hereby certified subject to the mitigation, monitoring, and reporting program found in Exhibit A for the Project, which is incorporatedherein.

4. California Environmental Quality Act Section 15091 “Statement of Fact, Findings, and Mitigation Measures” and Section 15093 “Statement of Overriding Considerations,” attached as Exhibit B, are appropriate and incorporated into the Project.
o0o

Page 4 of 4 ends

I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on the __________________, by the following vote:

AYES: COUNCILMEMBER: _Arias, Gonzales, Weir, Smith, Koman, Bashirtash, Kaur NOES: COUNCILMEMBER:

ABSTAIN: COUNCILMEMBER:

ABSENT: COUNCILMEMBER:

JULIE DRIMAKIS, CMC
CITY CLERK and Ex Officio Clerk
of the Council of the City of Bakersfield
APPROVED:

By

KAREN GOH
MAYOR of the City of Bakersfield
APPROVED AS TO FORM:

VIRGINIA GENNARO
City Attorney
By:

VIRIDIANA GALLARDO-KING
Deputy City Attorney
Exhibit: A. Mitigation Measures, Monitoring, and Reporting Program B. “Statement of Fact, Findings, and Mitigation Measures” and Section 15093 “Statement of Overriding Considerations,”
C. Location Map
AK | S:\03_Advance Planning\01_GPAs\01_Active\2023\23-0001_2401 Coffee Rd and Rosedale_Commercial Center\01_Hearing Documents & Noticing Documents\City Council\CC 11.4.26\03_Council CEQA Resolution No 23-0001 Final.docx Riverview Marketplace Commercial Project
City of Bakersfield
1 Riverview Marketplace Commercial Project
Mitigation Monitoring and Reporting Program
SECTION 1: AUTHORITY
This environmental Mitigation Monitoring and Reporting Program (MMRP) has been prepared pursuant to Section 21081.6 of the California Environmental Quality Act (CEQA) (Public Resources Code Section 21000 et seq.), and CEQA Guidelines (14 Cal. Code Regs. Section 15000 et seq.) Sections 15091(d) and 15097, to ensure implementation of and provide for the monitoring of mitigation measures required of the Riverview Marketplace Commercial Project (Project), as set forth in the Final Environmental Impact Report (EIR) prepared for the Project. This report will be kept on file in the offices of the CEQA Lead Agency, the City of Bakersfield (City).

As noted in the EIR, the Project has been designed to avoid sensitive resources, as reflected in Project design plans and in Project Design Features. The EIR also addresses the potential environmental impacts of the Project, and, where appropriate, recommends mitigation measures to avoid or substantially lessen significant environmental impacts. The MMRP detailed in the following matrix table is designed to monitor and ensure implementation of all mitigation measures that are adopted for the Project.

The City is the lead agency for the Project and assumes ultimate enforcement responsibilities for implementation of all mitigation measures listed in this MMRP. The City may assign responsibility for implementation or monitoring to appropriate designees such as a construction manager or third-party monitor. However, as the lead agency, the City remains responsible for ensuring that implementation of the mitigation measures occurs in accordance with this MMRP. In some cases, the City is required to secure permits or approvals from third-party agencies in order to implement a mitigation measure. In these cases, the City is responsible for verifying that such permits or approvals have been obtained in accordance with the conditions stipulated in the mitigation measure. The City’s existing planning, engineering, operations, and procurement review and inspection processes will be used as the basic foundation for the MMRP procedures and will also serve to provide the documentation for the reporting program.

SECTION 2: MONITORING SCHEDULE
Prior to construction, while detailed design plans are being prepared by City staff or its agents, City staff will be responsible for ensuring compliance with mitigation monitoring applicable to the Project construction, development, and design phases. Once construction has begun and is underway, monitoring of the mitigation measures associated with construction will be included in the responsibilities of City staff, who shall prepare or cause to be prepared periodic monitoring reports as appropriate. Regulatory agencies will have to harmonize CEQA mitigation with regulatory permit conditions and monitoring/reporting as part of the regulatory permitting process and will likely require submittal of formal monitoring reports. Once construction has been completed, the City will monitor the project as specified in the mitigation measures or as otherwise deemed necessary. At minimum, the City will prepare a mitigation monitoring status report prior to commencing construction, prior to commencing operations, within 90 days of commencing operations, and following completion of the first full year of operations.

Exhibit A
Riverview Marketplace Commercial Project
City of Bakersfield
2 SECTION 3: SUPPORT DOCUMENTATION
Findings and related documentation supporting the findings involving modifications to mitigation measures shall be maintained in the Project file with the MMRP and shall be made available to the public upon request.

SECTION 4: FORMAT OF MITIGATION MONITORING MATRIX
The mitigation monitoring matrix on the following pages identifies the environmental issue areas for which monitoring is required, the required mitigation measures, the time frame for monitoring, and the responsible implementing and monitoring agencies.

SECTION 5: DEFINITIONS
The following list provides definitions for acronyms used in the MMRP.

Acronyms/Abbreviation Description
BUOW ............................................. Burrowing Owl CALGreen........................................ California Green Building Standards Code CBB.................................................. Crotch’s Bumble Bee CDFW.............................................. California Department of Fish and Wildlife CDFG............................................... California Department of Fish and Game CESA................................................ California Endangered Species Act City.................................................. City of Bakersfield DEIR ................................................ Draft Environmental Impact Report HM .................................................. Habitat management HVAC............................................... Heating, ventilation, and air conditioning ITP................................................... Incidental Take Permit PG&E............................................... Pacific Gas & Electric PMR ................................................ Paleontological Monitoring Report ROW................................................ Right-of-way SJKF ................................................. San Joaquin Kit Fox SJVAPCD.......................................... San Joaquin Valley Air Pollution Control District State................................................ State of California SVP.................................................. Society of Vertebrate Paleontology USFWS ............................................ United States Fish and Wildlife Service VERA ............................................... Voluntary Emission Reduction Agreement VOC................................................. Volatile Organic Compounds Riverview Marketplace Commercial Project
City of Bakersfield
3 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)

AIR QUALITY
MM AQ-1: Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department, that verifies, to the City’s satisfaction, execution of the VERA.

Project Applicant Prior to issuance of
building permits
Construction
Manager

SJVAPCD
MM AQ-2: The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping.

This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.

Project
Proponent/Developer
Prior to start of
construction
During Project
construction
City of Bakersfield
Development
Services
Department

BIOLOGICAL RESOURCES
MM BIO-1: Burrowing Owl (BUOW) Pre-Construction Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Depending on the time elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of construction, additional focused surveys may be required during the survey season immediately preceding construction. As specified in the 2012 Staff Report, one 30-day pre-construction survey is recommended; however, multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may Project Applicant
Qualified Biologist
Prior to
commencement of
ground-disturbing
or vegetation-clearing activities
City of Bakersfield
Development
Services
Department
Riverview Marketplace Commercial Project
City of Bakersfield
4 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
colonize a site following previous negative survey results. Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to construction activities.

MM BIO-2: Burrowing Owl (BUOW) Avoidance Buffer. If western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to halt work if project activities are causing disturbance to western burrowing owls. In the event a burrowing owl or known burrowing owl den (active or inactive) is detected, and the no disturbance buffers outlined in the 2012 Staff Report on Burrowing Mitigation are not feasible, consultation with CDFW shall be warranted to discuss how to implement the project and avoid take. If take cannot be avoided, take authorization through the acquisition of an incidental take permit pursuant to Fish and Game Code Section 2081, subdivision (b), shall be necessary to comply with the California Endangered Species Act.

Project Applicant
Qualified Biologist
During construction City of Bakersfield
Development
Services
Department
CDFW, if needed
MM BIO-3: Nesting Birds. If ground disturbing and vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy Project Applicant
Qualified Biologist
Prior to start of
construction, no
more than 10 days
prior to initiation of
Project activities
that would remove
vegetation or
City of Bakersfield
Development
Services
Department
CDFW, if needed
Riverview Marketplace Commercial Project
City of Bakersfield
5 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
equipment) of all areas of the Project Site that could be directly or indirectly impacted by construction activity.

If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.

If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.
otherwise disturb
nesting activity
MM BIO-4: San Joaquin Kit Fox (SJKF) Pre-Construction Surveys. Pre-construction surveys to assess presence/absence of denning San Joaquin kit fox (SJKF) shall be conducted by the qualified biologist no less than 14 days and no more than 30 days prior to the commencement of any ground disturbance and/or construction activities or any project activity likely to impact the SJKF. Surveys shall identify kit fox habitat features occurring on the project site (if any are determined to occur during the surveys) and evaluate use by SJKF and, if possible, assess the potential impacts to the kit fox by the proposed activity. If a natal/pupping den is discovered within the project site or within 200 feet of the project site boundary, the appropriate agencies (e.g., California Department of Fish and Wildlife, City of Bakersfield) shall be immediately notified and under no circumstances shall the den be disturbed or destroyed without prior authorization. If the preconstruction survey reveals an active natal pupping or new information, the project applicant, construction contractor and biologist Project Applicant
Qualified Biologist
Prior to start of
construction, no
less than 14 days
and no more than
30 days prior to the
commencement of
any ground
disturbance and/or
construction
activities or any
project activity
likely to impact the
SJKF
City of Bakersfield
Development
Services
Department
CDFW, if needed
Riverview Marketplace Commercial Project
City of Bakersfield
6 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
shall contact the appropriate agencies immediately to obtain the necessary take authorization/permit. Written results of the preconstruction surveys shall be submitted to the appropriate agencies within five days after survey completion and prior to the start of ground disturbance and/or construction activities.

MM BIO-5: SJKF Avoidance Buffer. Prior to the commencement of any ground disturbing activities, the project applicant, construction contractor and project biologist shall implement no-disturbance buffers as described in the USFWS’ “Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance” (2011) (USFWS Protocol) around potentially suitable or known SJKF den sites identified during the pre-construction surveys outlined in Mitigation Measure BIO-4.

Project Applicant
Construction
Contractor
Project Biologist
Prior to the
commencement of
any ground
disturbing activities
City of Bakersfield
Development
Services
Department
MM BIO-6: SJKF Take Authorization. If the no-disturbance buffers outlined in Mitigation Measures BIO-5 are not feasible, the project applicant and California Department of Fish and Wildlife (CDFW) shall discuss how to implement the project and avoid take. If take cannot be avoided, the project applicant shall obtain take authorization from CDFW by obtaining an incidental take permit pursuant to Fish and Game Code section 2081, subdivision (b), in compliance with the California Endangered Species Act.

Project Applicant
Qualified Biologist
Prior to the
commencement of
any ground
disturbing activities
City of Bakersfield
Development
Services
Department
CDFW, if needed
MM BIO-7: Crotch’s Bumble Bee (CBB) Habitat Assessment. Prior to the commencement of any ground-disturbing activities, the qualified biologist shall conduct an additional habitat assessment to determine if the project site and immediate surrounding vicinity contain habitat suitable to support CBB. Potential nesting sites, which include all small mammal nesting burrows, perennial bunch grasses, thatched annual grasses, brush piles, old bird nests, and hollow logs shall be documented as part of the assessment.

Project Applicant
Qualified Biologist
Prior to the
commencement of
any ground-disturbing activities
City of Bakersfield
Development
Services
Department
MM BIO-8: CBB Surveys. If potentially suitable habitat is identified during the habitat assessment conducted under Mitigation Measure BIO-7, a qualified biologist shall conduct focused surveys for CBB and their requisite habitat features following the methodology outlined in the Project Applicant
Qualified Biologist
Prior to the
commencement of
any ground-disturbing activities,
City of Bakersfield
Development
Services
Department
Riverview Marketplace Commercial Project
City of Bakersfield
7 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023).
during habitat
assessment
MM BIO-9: CBB Avoidance. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, all small mammal burrows and thatched/bunch grasses shall be avoided by a minimum of 50 feet to avoid take and potentially significant impacts. If ground-disturbing activities occur during the overwintering period October through February), consultation with CDFW shall be conducted to discuss how to implement the proposed project’s construction-related activities and avoid take of the CBB. Any detection of CBB prior to or during project construction shall warrant discussions with CDFW to discuss how to avoid take.

Project Applicant
Qualified Biologist
Prior to the
commencement of
any ground-disturbing activities,
during habitat
assessment
City of Bakersfield
Development
Services
Department
CDFW, if needed
MM BIO-10: CBB Take Authorization. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, consultation with CDFW shall be warranted to discuss how to implement the proposed project and avoid take of the CBB. If take cannot be avoided, take authorization through the acquisition of an incidental take permit, pursuant to Fish and Game Code Section 2081, subdivision (b) is necessary to comply with the California Endangered Species Act.

Project Applicant
Qualified Biologist
Prior to the
commencement of
any ground-disturbing activities,
during habitat
assessment
City of Bakersfield
Development
Services
Department
CDFW, if needed

CULTURAL RESOURCES
MM CUL-1: Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in Project Applicant
Qualified Cultural
Resource Specialist
During
construction, if
suspected cultural
resources are
encountered during
ground disturbance
activities
City of Bakersfield
Development
Services
Department
Qualified Cultural
Resource Specialist
Native American
Heritage
Commission, if
needed
Riverview Marketplace Commercial Project
City of Bakersfield
8 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.

Other appropriate
individuals,
agencies, and/or
groups as
determined by the
specialist in
consultation with
the City, if needed
MM CUL-2: Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).

Project Applicant
Qualified Cultural
Resource Specialist
During
construction, if
human remains are
discovered
City of Bakersfield
Development
Services
Department
Qualified Cultural
Resource Specialist
Coroner, if needed

GEOLOGY AND SOILS
MM GEO-1: Paleontological Discovery and Monitoring. In the event paleontological resources, including fossil discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a Project Applicant
Qualified
Paleontologist
During
construction, in the
event
paleontological
resources, including
City of Bakersfield
Development
Services
Department
Riverview Marketplace Commercial Project
City of Bakersfield
9 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and techniques, who is knowledgeable in the geology of California (preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The qualified paleontologist shall be empowered to halt or divert ground disturbing activities.

If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the remainder of ground disturbance for the Project. Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted. Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.

Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for permanent curation and storage. At the conclusion of laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and fossil discoveries,
are encountered
Qualified
Paleontologist
Riverview Marketplace Commercial Project
City of Bakersfield
10 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.

GREENHOUSE GAS EMISSIONS
MM GHG-1: The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses.

Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.

Project
Proponent/Developer
Prior to issuance of
building permits
Prior to issuance of
the certificate of
occupancy
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
MM GHG-2: Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as the Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available.

Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.

Property Owner Prior to issuance of
the certificate of
occupancy
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
Riverview Marketplace Commercial Project
City of Bakersfield
11 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
MM GHG-3: All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.

Property Owner Prior to issuance of
the first certificate
of occupancy
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
MM GHG-4: Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.

Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities.

In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.

Project
Proponent/Developer
Prior to issuance of
a Business License
for a new
tenant/business
entity
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
MM GHG-5: The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.

Project
Proponent/Developer
Prior to issuance of
the first certificate
of occupancy
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
Riverview Marketplace Commercial Project
City of Bakersfield
12 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
MM GHG-6: The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.

Project
Proponent/Developer
Prior to issuance of
the certificate of
occupancy
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division
MM GHG-7: The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.

Project
Proponent/Developer
Prior to issuance of
construction
permits
City of Bakersfield
Development
Services
Department
City of Bakersfield
Building Division

TRAFFIC AND TRANSPORTATION
TRAF-PDF-1: Construction Traffic Management Plan. The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfield for approval. The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent feasible so as to avoid worker trips during those peak hours.
• Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained.

Project Applicant
Contractor
Prior to issuance of
construction
permits
City of Bakersfield
Development
Services
Department
Riverview Marketplace Commercial Project
City of Bakersfield
13 Mitigation Measures/Project Design Feature
Responsibility for
Implementation Timing
Responsibility for
Monitoring
Monitor
(Signature Required)
(Date of
Compliance)
• Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be performed on Sundays and holidays.
• Reduce the potential of trucks waiting for extended periods to load or unload.
• Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during traffic rerouting and deliveries.
• Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and loading/unloading on the Project Site.
• Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclist and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public.
• Identification of a construction manager and provision of a telephone number for any inquiries or complaints from residents regarding construction activities. The telephone number shall be posted at the site readily visible to any interested party during site preparation, grading, and construction.
1 Statement of Overriding Considerations and Statement of Facts and Findings for Riverview Marketplace Project General Plan Amendment No. 23-001

SECTION I - INTRODUCTION
An Environmental Impact Report (EIR) (State Clearinghouse No. 2025101507) has been prepared for the Riverview Marketplace Commercial Project (“Project”) in accordance with the California Environmental Quality Act (CEQA) (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.). The City of Bakersfield, Development Services Department – Planning Division is the Lead Agency for the Project under CEQA.

CEQA requires that the Lead Agency, before approving a project, identify each significant environmental impact of the project and make one or more written findings for each such impact.

Public Resources Code (PRC) Section 21002 provides that “public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available which would substantially lessen the significant environmental effects of such projects.” PRC Section 21081 and CEQA Guidelines Section 15091 provide that no public agency shall approve or carry out a project for which an EIR has been certified that identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding.

Pursuant to PRC Section 21081(a) and CEQA Guidelines Section 15091, for each significant environmental impact identified in the EIR, the Lead Agency must make one or more of the following three possible findings:

1. Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR.

2. Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency.

3. Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR.

The findings reported herein are based on substantial evidence in the entire record before the Lead Agency. The references set forth in these findings to certain pages or sections of the Draft EIR or Final EIR are for ease of reference and are not intended to provide an exhaustive list of the evidence relied upon for these findings.

Exhibit B
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
2 For each environmental issue area analyzed in the EIR, the following information is provided:
• Description of Significant Effect(s) - A description of the significant environmental effect(s) identified in the EIR.
• Project Design Features (PDFs) - A list of applicable Project Design Features that are incorporated into the Project.
• Mitigation Measures (MMs) - A list of applicable mitigation measures that are required as part of the Project.
• Finding - One or more of the three findings set forth above, as appropriate. • Rationale for Finding - A summary of the reasons for the finding(s).

With respect to a project for which significant impacts are not avoided or substantially lessened either through the adoption of feasible mitigation measures or feasible environmentally superior alternatives, a public agency, after adopting proper findings based on substantial evidence, may nevertheless approve the project if the agency first adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the project’s benefits rendered acceptable its unavoidable adverse environmental effects (California Code of Regulations, Title 14, Sections 15093 and 15043[b]; see also PRC Section 21081[b]).

SECTION II - ENVIRONMENTAL REVIEW PROCESS
The environmental review process for the Riverview Marketplace Commercial Project included the following key steps:

Notice of Preparation. Pursuant to Section 15082 of the CEQA Guidelines, the City circulated a Notice of Preparation (NOP) of the Draft EIR to State, regional, and local agencies, and members of the public for a 32-day public review period. The public review period began Friday, October 31, 2025, and concluded Monday, December 1, 2025. The purpose of the NOP was to formally notice that the City was preparing a Draft EIR for the Project, and to solicit input regarding the scope and content of the environmental information to be included in the Draft EIR. Four written comment letters were received during the scoping period.

Scoping Meeting: The City also held an EIR Scoping Meeting for the Project on Thursday, November 20, 2025. The purpose of the EIR Scoping Meeting was for the City to solicit input and written comments from agencies and the public on environmental issues or alternatives they believe should be addressed in the Draft EIR. A presentation explaining the Project was provided and potential attendees were given an opportunity to provide their comments on the scope of the Draft EIR. No members of the public attended the EIR Scoping Meeting, and no comments were received at the meeting.

Draft EIR. The Draft EIR was published on July 10, 2026, and is incorporated herein by reference in full. The Draft EIR was circulated for a 45-day public comment period in accordance with CEQA Guidelines Section 15105. The Draft EIR is a “Project EIR” as defined by Section 15161 of the CEQA Guidelines, which examines the environmental impacts of a specific development project. A Notice of Completion and Availability (NOCA) was distributed on July 10, 2026, to all property owners within 300 feet of the Project, which informed them where they could view the document Riverview Marketplace Commercial Project
Environmental Impact Report Findings
3 and how to comment. The Draft EIR was available to the public at the City of Bakersfield, Planning Division offices and the following local library: Kern County Beale Memorial library. A copy of the document was also posted online at https://www.bakersfieldcity.us/environmental-documents.

Notices were filed with the County Clerk on July 10, 2026. The NOCA was also sent with the Draft EIR to the Governor’s Office of Planning and Research State Clearinghouse for distribution to State Agencies and notice was provided in notice was provided in the Bakersfield Californian newspaper of general circulation
Final EIR. The Final EIR was published on September 18, 2026, which is hereby incorporated by reference in full. The Final EIR constitutes the second part of the EIR for the Project and is intended to be a companion to the Draft EIR. The Final EIR also incorporates the Draft EIR by reference. Pursuant to Section 15088 of the CEQA Guidelines, the City, as Lead Agency, reviewed all comments received during the review period for the Draft EIR and responded to each comment in Section II, Responses to Comments, of the Final EIR. On September 21, 2026, responses were sent to all public agencies that made comments on the Draft EIR at least 10 days prior to certification of the EIR pursuant to CEQA Guidelines Section 15088(b).

Public Hearing. A noticed public hearing for the Project was conducted by the City Planning Commission on October 1, 2026.

SECTION III - RECORD OF PROCEEDINGS
For purposes of CEQA and these Findings, the administrative record of proceedings for the Project consists of those items listed in CEQA Guidelines Section 15091(e), and includes, but is not limited to, the following documents:
• The Draft EIR for the Riverview Marketplace Commercial Project (2025101507) and all appendices thereto;
• The Final EIR for the Riverview Marketplace Commercial Project (2025101507), including all responses to comments, corrections, clarifications, and additions; • The Notice of Preparation (NOP) distributed on October 31, 2025, and all comments received in response thereto;
• All technical reports, studies, memoranda, maps, and other documents relied upon or referenced in the Draft EIR and Final EIR;
• All written comments submitted by agencies or members of the public during the public comment period on the Draft EIR;
• The Mitigation Monitoring Program (MMP)
• All testimony provided at public hearings on the Project; • The California Environmental Quality Act (Public Resources Code Section 21000 et seq.) and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.);
Riverview Marketplace Commercial Project
Environmental Impact Report Findings
4 • The Resolutions approved and adopted by the City in connection with the proposed Project, all documents incorporated by reference therein, and comments received after the close of the comment period and responses thereto;
All other documents referenced in or relied upon in the preparation of the Draft EIR and Final EIR, including but not limited to the City of Bakersfield General Plan, Municipal Code and all applicable specific plans, ordinances, and regulations.

SECTION IV - PROJECT DESCRIPTION
Project Overview
The Project Site is located on a portion of a larger property formerly occupied by the Pacific Gas & Electric (PG&E) Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells, electrical transmission lines on metal poles, towers, and wooden poles, and several dirt roads and mounds.

The Project involves construction and operation of the Riverview Marketplace, a commercial retail center that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.

The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas in front of storefronts, and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks, and a lawn area.

Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas. The discretionary entitlements, reviews, permits, and Riverview Marketplace Commercial Project
Environmental Impact Report Findings
5 approvals required to implement the Project include, but are not necessarily limited to, the following:
• Site Plan Review consistent with the Bakersfield Municipal Code Section 17.08.140. • General Plan Amendment (GPA) of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Tentative Tract Map
• Comprehensive Sign Plan
Project Objectives
The objectives of the Project are as follows:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design. • A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby. • Creation of new and future employment opportunities.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought-tolerant landscaping that visually enhances the Project Site and surrounding perimeter.
• A visually harmonious development as viewed both internally and externally.

V. NO IMPACT OR LESS THAN SIGNIFICANT WITHOUT MITIGATION Substantial evidence in the record supports the determination in the EIR that the Project would have no impact or a less than significant impact in the following areas without the need for mitigation measures. Based on the analysis contained in the Draft EIR, the City finds that the following environmental topics would not be significantly affected by the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
6 No Impact or Less Than Significant
Aesthetics
The Project Site is not located in an area designated as scenic in the Metropolitan Bakersfield General Plan; it is not within the City’s Hillside Development Combining Zone and is not within a City-designated Class I or II Visual Resource Area, Viewshed, or Slope Protection Area. The Project is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, the Project would not block a view corridor of a scenic resource.

The construction of commercial uses at the Project Site would be in character and compatible with existing urban land uses in the vicinity of the Project Site and is a natural extension of the urban growth occurring in the Project area. The Project, once developed, would improve the visual conditions on the Project Site. The Project would have a contemporary architectural design with articulated facades. Building materials would include, but not be limited to, cement plaster with stone veneer, aluminum wood siding metal canopies, and large display windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road frontage and Rosedale Highway frontages would run a “dry creek” feature composed of decorative cobbles, decomposed granite and crushed rocks. The Project would feature new landscaping along the entire site perimeter and internal to the Project Site.

Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian-oriented experience, and provide shade. Therefore, the Project would not have a substantial adverse effect on a scenic vista, and impacts are less than significant.

The Project Site is located within an urban area, surrounded by existing development. According to the Caltrans California State Scenic Highway System Map, the Project Site is not located within a scenic highway. The nearest eligible State scenic highway in Kern County is the Cuyama Highway State Route 166 (SR 166) located approximately 40-miles southwest of the Project Site.

Therefore, no impact would occur.

The Project would be consistent with the goals and policies of the General Plan as it relates to new commercial development. The Project proposes to transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions. The Project would have a contemporary architectural design with articulated facades. Buildings would have a maximum height of 90 feet (60 feet below the maximum building height for the M-2 zoning district). Accordingly, the Project, would comply with the applicable zoning requirements pertaining to scenic quality and impacts would be less than significant.

The Project Site is located in an urbanized area of the City, which includes nighttime lighting associated with the surrounding land uses. This includes street lighting, parking lot lighting, and lights from vehicles. Nearby light sensitive receptors consist of residential developments to the west, southwest, and north of the Project Site.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
7 Construction activities would be limited to daytime hours per BMC Section 9.22.050: 6:00 AM to 9:00 PM Monday through Friday, and 8:00 AM to 9:00 PM on weekends and holidays.

Construction activities would not require nighttime illumination. Daytime construction equipment may produce temporary glare from metal surfaces; however, these effects would be short-term, intermittent, localized to the Project Site, and typical of construction activities in urbanized areas. As construction would not occur outside permitted hours and would not require nighttime lighting, construction-related light and glare impacts would be less than significant.

Operational lighting for the Project is intended to minimize light trespass and glare from the Project Site onto adjacent properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination. Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new building; lighting for pedestrian walkways and common gathering areas; lighting for the green spaces; ground-mounted decorative lighting for landscape and architectural features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.

All new light sources associated with the Project would be required to comply with the Bakersfield Municipal Code for exterior lighting standards, which prevent light spillover, glare, nuisance, inconvenience, or hazardous interference of any kind on adjacent properties and streets. Mandatory compliance with the Bakersfield Municipal Code would ensure that the Project’s light fixtures and signage would not introduce any design features that would cause artificial light or glare to an extent that would adversely affect day or nighttime views in the area.

Thus, potential lighting and glare impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Aesthetics.

Agriculture and Forestry Resources
The Project site is located within an urban area, surrounded by existing development, and is not currently in use for agricultural activities or forest uses. Based on a review of the California Important Farmland Finder, neither the Project Site nor any adjacent land is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Instead, the Project Site and adjacent land are designated as “Vacant and Disturbed Land” and “Urban and Built-Up Land,” with the exception of an approximately 17-acre parcel of “Semi-Agricultural and Rural Commercial Land,” which is not considered protected farmland. As such, the Project would not convert any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to a non-agricultural use. Neither the Project Site nor its surroundings are zoned for agriculture or forest land.

The Project would not result in the conversion of farmland to non-agricultural use or the conversion of forest land to non-forest use. No impacts to agriculture and forestry resources. would occur.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact to Agriculture and Forestry Resources.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
8 Air Quality (Pollutant Concentrations)
The Project would develop retail and commercial (e.g., medical office, and health club) land uses.

Operation of the proposed uses could include occasional use of landscaping equipment and natural gas consumption for commercial cooking uses. However, air pollutant emissions generated from these activities would be nominal.

The Project would include a gas station with up to 40 fuel dispensers. CARB recommends avoiding siting gas stations within 500 feet of sensitive land uses to avoid exposing sensitive receptors to substantial concentration of air pollutants. The nearest potential sensitive land uses to the proposed gas station would be the two buildings across El Toro Viejo Road, approximately 650 feet to the west, which would be outside the 500-foot buffer. Furthermore, emissions of contaminants (TACs) from stationary sources that may be associated with the proposed uses (e.g., restaurant chain-driven char broiler), including the proposed gas station, would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits. Regulations would ensure that stationary source emissions (permitted sources) would be reduced or mitigated below San Joaquin Valley Air Pollution Control District (SJVAPCD). significance thresholds of 20 in one million cancer risk and one for acute risk at the maximally exposed individual.

While the Project could generate heavy-duty truck travel along the local roadways, the Project would only incrementally increase average daily trips for all vehicle types along the local roadways. Because the Project would not have any warehousing uses and would primarily consist of retail, restaurant, and commercial uses, it is anticipated that Project-related traffic volumes would primarily consist of passenger vehicles associated with patrons. Thus, the incremental increase in vehicle trips that could result from implementation of the proposed Project would be below roadway volumes identified by the California Air Resources Board (CARB) land use siting screening criteria to avoid exposing sensitive receptors to substantial concentrations of air pollutants from vehicles traveling along roadway. Therefore, operation of the Project would not expose nearby off-site sensitive receptors to substantial concentrations of TACs. Potential impacts would be less than significant.

CO Hotspots
Areas of vehicle congestion have the potential to create pockets of CO called hotspots. These pockets have the potential to exceed the State 1-hour standard of 20 ppm or the 8-hour standard of 9.0 ppm. Hotspots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. However, emissions from motor vehicles, the largest source of CO emissions, have been declining since 1985, despite increases in Vehicle Miles Traveled (VMT), due to the introduction of new automotive emission controls and fleet turnover.

Furthermore, under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection to more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact. Overall, implementation of the Project would result in overall peak hour turning volumes Riverview Marketplace Commercial Project
Environmental Impact Report Findings
9 that would not produce the volume of traffic required to generate a CO hotspot. Therefore, implementation of the Project would not have the potential to substantially increase CO hotspots at intersections in the vicinity of the Project Site. Impacts would be less than significant.

Construction Health Risks to Off-Site Receptors
The maximum incremental cancer risk levels during the construction phase of the Project at the Maximum Exposed Individual Resident (MEIR) and Maximum Exposed Individual Worker (MEIW) are 1.5 per million and 0.3 per million, respectively, which would not exceed the cancer risk significance threshold of 20 in one million. For noncarcinogenic effects, the hazard index identified for each toxicological endpoint totaled less than one for the MEIR and MEIW.

Therefore, chronic noncarcinogenic hazards are within acceptable limits, and project-related construction activities would not expose nearby sensitive receptors to substantial pollutant concentrations. Impacts would be less than significant.

Air Quality (Objectionable Odors)
The type of facilities that are considered to have objectionable odors include wastewater treatment plants, compost facilities, landfills, solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and food manufacturing facilities. The uses proposed by the Project do not fall within these land uses.

During project-related construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily generate odors. However, any construction-related odor emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reached any sensitive receptor, they would be diluted to well below any level of air quality concern. Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of odor-producing materials. Thus, overall, construction and operation of the Project are not expected to generate odors that would adversely affect a substantial number of people. Impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Air Quality (Objectionable Odors and Pollutant Concentrations).

Biological Resources (Riparian habitat or other sensitive natural community) The Project site is highly disturbed. There are no wetlands or riparian habitats found on or near the Project Site. The November 2025 survey completed for the Project confirmed that there are no wetlands or riparian habitats found on the Project Site. Aerial images indicated and the November 2025 field survey confirmed that an underground stormwater feature exists near the east border of the Project Site. The feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, the General Biological Assessment determined that this stormwater feature exists underground and is not jurisdictional waters.

Therefore, no impacts to jurisdictional waters would occur from Project implementation.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
10 Accordingly, jurisdictional waters would not be impacted by Project implementation and no impact to any riparian habitat or other sensitive natural community identified would occur.

Biological Resources (Wetlands)
The Project would not impact riparian areas, vernal pools or other jurisdictional aquatic resources because these features do not occur on or near the Project Site. As noted above, an underground drainage feature was identified underneath the Project Site, but this is not considered a protected wetland. Therefore, no impacts would occur.

Biological Resources (Wildlife Movement)
No wildlife movement corridors were found to be present on the Project Site. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby, which are typically used by wildlife for movement. There are no water features on the Project Site that would support the movement of native or migratory fish. Furthermore, the Project Site is an urbanized environment and is blocked off on the east end by railroad tracks and a residential area to the west. However, urban SJKF can move through disturbed open land between developed parcels. The open 46.16-acre Project area may therefore function as a local stepping-stone or permeable movement area. With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant. To avoid impacts to Crotch’s Bumble Bee and the San Joaquin Kit Fox, MM BIO-4-10 would be implemented
Biological Resources (Habitat Conservation Plan, Natural Community Conservation Plan)
The Project Site is not located within the boundaries of an approved and active State or federal Habitat Conservation Plan. The Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) and associated Incidental Take Permit (ITP) expired on January 1, 2023. As such, the Project must comply with direct requests from U.S. Fish and Wildlife Service (USFWS) or California Department of Fish and Wildlife (CDFW).

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Biological Resources (Riparian habitat or other sensitive natural community, wetlands, wildlife movement, Habitat Conservation Plan, Natural Community Conservation Plan) Cultural (Historic Resource)
The records search conducted for the Project have revealed that 20 previous cultural resource studies have taken place, and 14 cultural resources have been identified within one-half mile of the Project Site. Three of the previous studies assessed portions of the Project Site for cultural resources, and one resource (a historic-period refuse scatter designated P-15-3290) was previously identified within the Project Site boundaries; however, during the field survey conducted as part of the Cultural Resources Assessment, the resource was not able to be located and assumed to be destroyed. Four additional historic-period cultural resources were identified and evaluated against the California Register. These identified resources were recommended not Riverview Marketplace Commercial Project
Environmental Impact Report Findings
11 eligible for the California Register and therefore are not considered a historic resource under CEQA consistent with CEQA Guidelines Section 15064.5. As such, impacts to historical resources would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Historic Resources.

Energy
To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. Moreover, all construction equipment would cease operating upon completion of the Project construction. Thus, energy use during the construction of the proposed Project would not be considered inefficient, wasteful, or unnecessary.

During operation, the Project would result in electricity demand; however, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the proposed Project would install rooftop PV systems and battery storage systems.

Furthermore, compliance with CALGreen would contribute to reducing indoor water use, which would also contribute to minimizing electricity demand from the transport and distribution of water. Thus, electricity use from the operation of the proposed Project would not be considered inefficient, wasteful, or unnecessary. Development pursuant to the proposed Project would result in a net increase in natural gas demand. The proposed Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing the energy efficiency of the proposed buildings.

While the operation of the Project would result in fuel usage, the Project Site is within a half mile of bus stops for three Golden Empire Transit bus routes and would be accessible from the existing surrounding sidewalks and class II bike lanes along Rosedale Highway and Coffee Road. The proposed Project would also provide bicycle parking and lockers. These amenities could contribute to minimizing vehicle trips and VMT. In addition, fuel efficiency standards for automobiles are established nationwide under the Corporate Average Fuel Economy (CAFE) standards and ensure that vehicles produced in future years have greater fuel efficiency, and generally result in an overall benefit of reducing fuel usage by providing the population of the City and region with more fuel-efficient vehicle options. Thus, it is expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.

The Project would be subject to the 2026 Building Energy Efficiency Standards and, in compliance with those standards, would install battery storage and rooftop PV systems. These systems would support the statewide transition to renewable energy. Therefore, implementation of the Project would not conflict with or obstruct plans for renewable energy and energy efficiency.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
12 Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Energy.

Geology and Soils (Excluding Paleontological Resources) The Geotechnical Investigation concluded that all geologic and seismic hazards, including fault rupture, seismic ground shaking, liquefaction, settlement, lateral displacement, landslides, flooding, tsunamis, erosion, and subsidence, present low risk with mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Geology and Soils (Excluding Paleontological Resources).

Hazards and Hazardous Materials
A Phase I Environmental Site Assessment (Phase I ESA), a Soil Vapor Sampling Report (Soil Vapor Report) and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), were prepared for the Project.

The Phase I ESA determined that there is one controlled recognized environmental condition (CREC) in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the Central Valley Regional Water Quality Control Board (CVRWQCB). The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the Project Site. As such, no hazards currently exist on the Project Site that could affect construction.

All construction activities would comply with laws, regulations, and policies governing the use of hazardous materials, ensuring that Project implementation would not serve to increase public or environmental exposure to hazardous materials and preventing impacts related to accident or upset conditions. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process.

While Valley Fever is associated with soil disturbance, impacts associated with Valley Fever are related to the Coccidioides fungal spore, which is a biological agent. In general, a CEQA-level air quality framework and analysis evaluate potential impacts associated with criteria air pollutants and toxic air contaminants, which are chemical pollutants. However, ground disturbing activities can aerosolize fungal spores present in project soils, creating a potential inhalation exposure pathway. Risk is generally elevated during dry, windy conditions and in years following drought (dry soil is more easily aerosolized), and disturbance of previously undisturbed or long-undisturbed soils poses higher risk than disturbance of soils that have been recently worked.

Fugitive dust suppression measures generally reduce impacts from Valley Fever. Because the Riverview Marketplace Commercial Project
Environmental Impact Report Findings
13 proposed Project is a non-residential project that would disrupt more than five acres of land, it would be subject to San Joaquin Valley Air Pollution Control District (SJVAPCD) Rule 8021 to minimize fugitive
dust during construction activities. Under Rule 8021, the proposed Project would be required to prepare Riverview Marketplace Commercial Project and submit a Dust Control Plan (DCP) to the SJVAPCD for approval. The DCP would be required to detail specific actions to ensure that visible dust emissions do not exceed 20 percent opacity. These actions can include watering areas of soil disturbance and use of dust suppressants. Compliance with Rule 8021 would help minimize generation of fugitive dust.

In addition, construction contractors would be subject to California Occupational Safety and Health requirements enforced through California Division of Occupational Safety and Health (Cal/OSHA) oversight. Under Section 3203, Title 8 of the California Code of Regulations (Title 8 CCR Section 3203), construction employers for the proposed project would be required to identify workplace hazards, implement a system to communicate occupation safety and health-related matters to employees, and implement a system to ensure employees comply with safe and healthy work practices. Title 8 CCR Section 5141 would require construction employers to implement appropriate engineering controls to control harmful exposure to employees while Title 8 CCR Section 5144 would oversee use of respirators for employers when necessary to protect their health. Because Kern County is identified as a highly endemic region for Valley Fever under California Labor Code Section 6709, construction contractors for the Project would be required to provide training and awareness on Valley Fever for the employees pursuant to the Section. Overall, implementation of SJVAPCD fugitive dust control measures and compliance with workplace occupational safety and health requirements and Cal/OSHA oversight would minimize potential Valley Fever exposure to construction workers and no significant impacts would occur.

Project operations would likely involve typical hazardous materials/chemicals such as cleaners, paints, solvents, and fertilizers and pesticides for site landscaping for most of the commercial uses, and regular use of hazardous materials during operation of the gas station and car wash.

Any routine transport, use, and disposal of these materials during Project operations would adhere to federal, State, and local regulations for the transport, handling, storage, and disposal of hazardous substances. Therefore, with adherance to these mandatory requirements, the Project would not pose a significant threat related to the release of hazardous materials into the environment. Impacts would be less than significant.

As identified in the Phase I ESA, the Project Site is neither on the Cortese List currently or historically. However, eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with potential impacts to soil, soil vapor, and/or groundwater. However, based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. Accordingly, Project construction and operation would not create a significant hazard to the public or the environment. Impacts would be less than significant.

The Project is not located within two miles of a public airport, which would result in a safety hazard or excessive noise for people residing or working in the Project area. According to the Riverview Marketplace Commercial Project
Environmental Impact Report Findings
14 California Department of Forestry and Fire Protection (CAL FIRE), the Project Site is not within or in proximity to a Very High Fire Hazard Severity Zone (VHFHSZ). The Project Site is located within a Local Responsibility Area and currently receives fire protection services through a Joint Powers Agreement with Bakersfield Fire Department (BFD) and Kern County Fire Department (KCFD).

Calls for service from the Project Site would be addressed by KCFD. No aspect of the Project would prevent the implementation of the Kern Multi Jurisdictional Hazard Mitigation Plan (MJHMP) and Emergency Operations Plan.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Hazards and Hazardous Materials.

Hydrology and Water Quality
The Project would be required to comply with all applicable federal, State, and local regulations pertaining to surface water and groundwater quality, including the General Permit requirements under the National Pollutant Discharge Elimination System (NPDES) program for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a Stormwater Pollution Prevention Plan (SWPPP) would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite, as well as establish measures to reduce the potential for erosion.

The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with the General Permit and MS4 Permit, the project would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

The Water Supply Assessment completed for the Project includes projections for 2025 through 2040 that show that the Project’s Domestic Water System can adequately meet the Project's demand without depleting groundwater or affecting its overall quality. Accordingly, the Project would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

The Project Site is located within Zone X, which denotes an area with reduced flood risk. While upon completion of construction, the amount of impervious surface on the Project Site would be increased when compared to existing conditions, the Project’s drainage facilities would be designed to ensure that all on- and off-site drainage and storm drain facilities would be adequately sized to accommodate runoff from storm events consistent with the recommendations included in the Drainage Study prepared for the Project. Additionally, the proposed Project would not alter the course of a stream or river that would result in flooding.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
15 Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Hydrology and Water Quality.

Land Use and Planning
The Project Site is surrounded by Rosedale Highway and the Northwest Promenade to the north; a PG&E electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east. The Project would not include the development of new obstacles that would divide the existing community. Additionally, the Project would connect to the existing roadway system and other infrastructure and would not involve the reconfiguration of streets that could have the potential to alter the surrounding pattern of future development.

The Project’s proposed commercial center would be consistent with the surrounding commercial uses, as well as the amended General Plan designation and current zoning designation, thus implementing the City’s vision for the area.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Land Use and Planning.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Moreover, the Project does not propose operations that would encroach upon existing oil operations The Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, the Project would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. No mitigation is required.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Mineral Resources.

Noise
Construction noise levels associated with the Project were modeled and were found to be below the Federal Transit Administration (FTA) thresholds for residential and commercial uses.

Therefore, Project related construction noise impacts would be less than significant. As concluded in the Noise analysis prepared for the Draft EIR, operational noise impacts that include operation of the car wash, commercial uses, unloading and loading, mechanical equipment, drive-thru, and related traffic operations were found to be less than significant.

Construction vibration levels would be below thresholds for vibration levels and any related architectural damage vibration impacts would be less than significant. Commercial uses would not be immediately adjacent to vibration-sensitive uses and no significant vibration impacts Riverview Marketplace Commercial Project
Environmental Impact Report Findings
16 would occur from vibration generated by operation of the Project. Therefore, Project related operational vibration impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Noise.

Population and Housing
The Project would not displace existing people. The Project proposes the development of a commercial retail center and does not include a residential component that would result in an increase of residents and population within the City. As such, the Project would not directly induce population growth.

Indirectly, the Project does not propose the extension of roads or existing infrastructure that would result in indirect growth within the City. The Project is expected to require 969 employees.

Although operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Thus, employees would likely be drawn from the existing population. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Population and Housing.

Public Services
Project development and operation would result in an incremental increase in demand for fire protection services. However, as a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire protection services. Additionally, the Project would be constructed pursuant to code requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by the BFD and the KCFD.

Further, the Project would be subject to applicable development impact fees relating to fire protection. Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.

As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand. However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or Riverview Marketplace Commercial Project
Environmental Impact Report Findings
17 other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand. Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant Regarding impacts to schools, the Project would develop a commercial development and would not require development of new housing. It is anticipated that future employees of the Project would reside within the City and immediately surrounding area. Therefore, the Project is not anticipated to result in substantial, unplanned population growth.

The State of California requires payment of development impact fees to mitigate project impacts to school facilities (CGC Section 65996; SB 50). All new residential, commercial, and industrial construction and/or an addition of covered or enclosed space are subject to the collection of developer fees. This fee is determined by the square footage of assessable space, which is measured from the perimeter of the structure. These fees pay for facility expansion and upgrades needed to serve new students. It is not anticipated that the proposed Project would generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impact to school facilities. Therefore, impacts would be less than significant.

It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project Site would be nominal.

Accordingly, the Project is not anticipated to affect service ratios, response times, or other performance objectives for parks and would not require the construction of any new or altered park facility. Therefore, impacts to parks would be less than significant.

Kern County Library operates libraries in close proximity to the Project Site, including the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southwest of the Project Site. As discussed, it is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Public Services.

Recreation
Increase in the demand for existing neighborhood and regional parks or other recreational facilities typically occurs due to an increase in the residential population. The Project does not include residential components, and it is anticipated that future employees would reside within the City and immediately surrounding area. Accordingly, the proposed Project would not result in an increase in population and would not increase demand on existing recreational facilities to a degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond Riverview Marketplace Commercial Project
Environmental Impact Report Findings
18 what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Recreation.

Transportation, (Plan, Ordinance or Policy, Hazardous Geometric Design) The Project would be required to provide infrastructure improvements needed to meet the demand created by the development and provide off-site improvements designed to ensure the construction of the local and regional transportation networks to their ultimate classifications.

These improvements could be funded through a development fee payment towards adopted funding mechanisms such as the Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements, and the Project will pay its fair share contribution towards the cost of these improvements. All required improvements for the Project are already included as part of the design or would be funded by the Bakersfield RTIF program, which the Project applicant would be responsible for contributing to. Therefore, no additional improvements or mitigation would be required and the Project would be consistent with General Plan LOS requirements. As the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities, impacts would be less than significant.

The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by BFD and KCFD, which have an existing Joint Powers Agreement (JPA) to provide emergency services to the Project Site. Sight distance at each of the Project’s access point would be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. In consideration of regulatory requirements and the improvements, the Project would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Transportation (Plan, Ordinance or Policy, Hazardous Geometric Design).

Utilities and Service Systems
As detailed in the Water Supply and Demand Analysis, Sewer Area Study and technical report addressing energy that were prepared for the Project, the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects, therefore, impacts related to utilities and service systems would be less than significant. In addition, adequate water, sewer, drainage, energy and telecommuting infrastructure exists to serve the Project. Furthermore, the Project Riverview Marketplace Commercial Project
Environmental Impact Report Findings
19 would not require or result in the relocation or construction of new or expanded water or wastewater treatment facilities.

Construction associated with the Project would result in solid waste associated primarily with grading activities. There would be limited construction demolition debris. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals.

The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. As such, the Project would not generate solid waste in excess of State or local standards or otherwise impair the attainment of solid waste reduction goals, and impacts would be less than significant.

The Project would be served by the Metropolitan Sanitary Landfill/Bena Landfill, operated by the Kern County Public Works Department. This Class III municipal solid waste facility has a permitted maximum throughput of 4,500 tons per day and an estimated remaining capacity of approximately 22 million tons, equating to approximately 21 years of operation at current disposal rates.

Regarding the Project’s operation, the Project would generate an estimated disposal volume of 474 tons per year (1.3 tons/day). This generation represents approximately 0.03 percent of the landfill’s permitted daily throughput and an even smaller fraction of its remaining capacity. Given the minimal contribution of both operational and construction solid waste relative to available landfill capacity, the fact that the waste stream is accounted for in the County Integrated Waste Management Plan, and the Project’s compliance with all applicable waste reduction and diversion requirements, the Project would not generate solid waste in excess of state or local standards, exceed the capacity of local infrastructure, or impair the attainment of solid waste reduction goals. Therefore, impacts would be less than significant, and no further analysis is warranted.

The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Utilities and Service Systems.

Wildfire
The Project Site is not located in a State Responsibility Area (SRA) or lands classified as Very High Fire Hazard Severity Zones (VFHSZs). During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the BFD and KCFD. Because the Project is required to comply with all applicable City codes, including the CBC and California Fire Code, which has been incorporated into the City’s Municipal Codes, and is not located in a VHFHSZ, construction and operation of the Project would not increase the risk of fire, nor would it require the installation/maintenance of infrastructure Riverview Marketplace Commercial Project
Environmental Impact Report Findings
20 that would exacerbate fire risk. Furthermore, compliance with the California Fire Code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, no impact would occur.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in no impact or a less than significant impact with respect to Wildfire.

VI. Less Than Significant Impacts with Mitigation
The EIR identified certain impacts that would be less than significant with implementation of mitigation measures. For each of the following impacts, the City makes the finding pursuant to Public Resources Code Section 21081(a)(1) that changes or alterations have been required in, or incorporated into, the Project which mitigate or avoid the significant effects on the environment.

Air Quality (Air Quality Plan and Criteria Pollutant)
The SJVAPCD is responsible for reducing emissions from area, stationary, and mobile sources in the SJVAB to achieve the National and California Ambient Air Quality Standards (AAQS). A consistency determination with the AQs plays an important role in local agency project review by linking local planning and individual projects to the Air Quality Management Plans (AQMPs).

It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in the AQMPs.

Kern Council Of Governments (KCOG) is one of SJVAPCD’s partners in the preparation of the AQMPs, providing the latest economic and demographic forecasts and developing transportation measures in Kern County. Regional population, housing, and employment projections developed by Kern COG are based, in part, on the City’s General Plan land use designations. These projections form the foundation for the emissions inventory of the AQMPs and are incorporated into the regional transportation plan/sustainable communities strategy (RTP/SCS) prepared by Kern COG to determine priority transportation projects and vehicle miles traveled in the Kern COG region. Because the AQMPs’ strategies are based on projections from local general plans, projects that are consistent with the local general plan are considered consistent with the air quality-related regional plan. Additionally, only large projects have the potential to substantially affect the demographic forecasts in the AQMPs.

The Project Site is designated as P and zoned as M-2. As part of the Project, the General Plan designation would be amended to change the designation from P to LI, which both allows for the Project’s use and aligns with its existing zoning designation.

Also, under CEQA Guidelines Section 15206(b), a proposed project is considered of statewide, regional, or area-wide significance if the project is a commercial office building of 250,000 square feet or more or employs 1,000 or more employees and/or a shopping center of 500,000 square feet or more or employs 1,000 or more employees. The amount of retail space proposed and the projected number of new jobs generated would be less than 500,000 square feet and 1,000 Riverview Marketplace Commercial Project
Environmental Impact Report Findings
21 employees. Thus, the Project would not substantially affect demographic projections beyond what is accounted for in the AQMPs.

However, per SJVAPCD guidance, project consistency with the AQMPs is based on whether project emissions would exceed the SJVAPCD regional significance thresholds. The Project would exceed the regional operation significance thresholds for VOC and NOX and would cumulatively contribute to the nonattainment designations in the SJVAB without mitigation.

The Project would implement Mitigation Measure (MM) AQ-1, which would require a Voluntary Emission Reduction Agreement (VERA) for the Project; MM AQ-2, which restricts paints and coatings that can be used for the Project; and MM GHG-3, which requires landscaping equipment to be all electric. Implementation of these MMs, in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510, would, at minimum, offset the amount of Project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Implementation of MM AQ-1 would also ensure consistency of the proposed Project with the applicable SJVAPCD air quality plans and ensure that operation of the Project would not cumulatively contribute to the nonattainment designations of the SJVAB. . As such, impacts would be less than significant with mitigation incorporated.

Mitigation Measures
MM AQ-1 Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, execution of the VERA.

MM AQ-2 The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Air Quality (Air Quality Plan and Criteria Pollutant).

Biological Resources (Sensitive Species, Local Policies) The Project site is highly disturbed and located in a highly urbanized area. It does not provide suitable habitat to support these species. Accordingly, the Project would not have a substantial Riverview Marketplace Commercial Project
Environmental Impact Report Findings
22 adverse effect on any species identified as a candidate, sensitive, or special-status species in local and regional plans, policies, or regulations, or by the CDFW or USFWS.

Additionally, as discussed above, migratory non-game native bird species are protected under the Migratory Bird Treaty Act (MBTA) and the California Fish and Game Code prohibits take of all birds and their active nests. The Western burrowing owl (BUOW) was approved by the California Fish and Game Commission as a candidate species for listing under the California Endangered Species Act (CESA) in 2024 and, therefore, receives the same legal protection afforded to state listed threatened and endangered species. The Project Site does not contain suitable habitat for the BUOW and it was not present on the Project Site during the field survey. However, because BUOWs may become established on disturbed sites prior to construction, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in Mitigation Measure (MM) BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.

Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the potential for the Project to impact MBTA protected birds exists. If vegetation removal and other ground disturbance activities can be conducted outside of the recognized nesting bird season, impacts to nesting birds are not expected. However, if work cannot be avoided during the nesting bird season, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity (for instance, mobilization of heavy equipment). With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant.

Additionally, in reviewing the applicable General Plan goals, policies, and implementation programs the Project would be consistent with the General Plan by avoiding impact to sensitive biological communities and species by creating a buffer around nesting birds protected by the MBTA and surveying and buffering the BUOW through the implementation of MM BIO-1 through MM BIO-3. To avoid impacts to Crotch’s Bumble Bee and the San Joaquin Kit Fox, MM BIO-4-10 would be implemented.

Accordingly, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant with mitigation.

Mitigation Measures
MM BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Depending on the time Riverview Marketplace Commercial Project
Environmental Impact Report Findings
23 elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of construction, additional focused surveys may be required during the survey season immediately preceding construction. As specified in the 2012 Staff Report, one 30-day pre-construction survey is recommended; however, multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may colonize a site following previous negative survey results. Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to construction activities.

MM BIO-2 Burrowing Owl (BUOW) Avoidance Buffer. If western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to halt work if project activities are causing disturbance to western burrowing owls. In the event a burrowing owl or known burrowing owl den (active or inactive) is detected, and the no disturbance buffers outlined in the 2012 Staff Report on Burrowing Mitigation are not feasible, consultation with CDFW shall be warranted to discuss how to implement the project and avoid take. If take cannot be avoided, take authorization through the acquisition of an incidental take permit pursuant to Fish and Game Code Section 2081, subdivision (b), shall be necessary to comply with the California Endangered Species Act.

MM BIO-3 Nesting Birds. If ground disturbing and vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy equipment) of all areas of the Project Site that could be directly or indirectly impacted by construction activity.

If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously Riverview Marketplace Commercial Project
Environmental Impact Report Findings
24 monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.

If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.

MM BIO-4 San Joaquin Kit Fox (SJKF) Pre-Construction Surveys. Pre-construction surveys to assess presence/absence of denning San Joaquin kit fox (SJKF) shall be conducted by the qualified biologist no less than 14 days and no more than 30 days prior to the commencement of any ground disturbance and/or construction activities or any Project activity likely to impact the SJKF. Surveys shall identify kit fox habitat features occurring on the project site (if any are determined to occur during the surveys) and evaluate use by SJKF and, if possible, assess the potential impacts to the kit fox by the proposed activity. If a natal/pupping den is discovered within the Project Site or within 200 feet of the project site boundary, the appropriate agencies (e.g., California Department of Fish and Wildlife, City of Bakersfield) shall be immediately notified and under no circumstances shall the den be disturbed or destroyed without prior authorization. If the preconstruction survey reveals an active natal pupping or new information, the Project applicant, construction contractor and biologist shall contact the appropriate agencies immediately to obtain the necessary take authorization/permit. Written results of the preconstruction surveys shall be submitted to the appropriate agencies within five (5) days after survey completion and prior to the start of ground disturbance and/or construction activities.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
25 MM BIO-5 SJKF Avoidance Buffer. Prior to the commencement of any ground disturbing activities, the Project applicant, construction contractor and project biologist shall implement no-disturbance buffers as described in the USFWS’ “Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance” (2011) (USFWS Protocol) around potentially suitable or known SJKF den sites identified during the pre-construction surveys outlined in Mitigation Measure BIO-4.

MM BIO-6 SJKF Take Authorization. If the no-disturbance buffers outlined in Mitigation Measures BIO-5 are not feasible, the project applicant and California Department of Fish and Wildlife (CDFW) shall discuss how to implement the project and avoid take. If take cannot be avoided, the Project applicant shall obtain take authorization from CDFW by obtaining an incidental take permit pursuant to Fish and Game Code section 2081, subdivision (b), in compliance with the California Endangered Species Act.

MM BIO-7 Crotch’s Bumble Bee (CBB) Habitat Assessment. Prior to the commencement of any ground-disturbing activities, the qualified biologist shall conduct an additional habitat assessment to determine if the project site and immediate surrounding vicinity contain habitat suitable to support CBB. Potential nesting sites, which include all small mammal nesting burrows, perennial bunch grasses, thatched annual grasses, brush piles, old bird nests, and hollow logs shall be documented as part of the assessment.

MM BIO-8 CBB Surveys. If potentially suitable habitat is identified during the habitat assessment conducted under Mitigation Measure BIO-7, a qualified biologist shall conduct focused surveys for CBB and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023).

MM BIO-9 CBB Avoidance. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, all small mammal burrows and thatched/bunch grasses shall be avoided by a minimum of 50 feet to avoid take and potentially significant impacts. If ground-disturbing activities occur during the overwintering period October through February), consultation with CDFW shall be conducted to discuss how to implement the proposed project’s construction-related activities and avoid take of the CBB. Any detection of CBB prior to or during project construction shall warrant discussions with CDFW to discuss how to avoid take.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
26 MM BIO-10 CBB Take Authorization. If CBB is detected during the habitat assessment conducted under Mitigation Measure BIO-7, consultation with CDFW shall be warranted to discuss how to implement the proposed project and avoid take of the CBB. If take cannot be avoided, take authorization through the acquisition of an incidental take permit, pursuant to Fish and Game Code Section 2081, subdivision (b) is necessary to comply with the California Endangered Species Act.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Biological Resources (Sensitive Species, Local Policies).

Cultural Resources (Archaeological Resources and Human Remains) Although neither the record search nor the field visit conducted as part of the DEIR identified archeological resources, ground-disturbing activities have the potential to reveal buried deposits not observed on the surface. Additionally, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.

Therefore, the Project would implement Mitigation Measure (MM) CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. As such, with the implementation MM CUL-1, impacts to archaeological resources would be less than significant with mitigation incorporated. In the event that any human remains, or related resources are discovered, such resources would be treated in accordance with all applicable federal, state, and local regulations and guidelines for disclosure, recovery, relocation, and preservation, including State Health and Safety Code. If human remains are encountered during any project activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. As such, the Project would implement MM CUL-2, Inadvertent Discovery of Human Remains, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of this MM CUL-2, impacts to human remains would be less than significant with mitigation incorporated.

Mitigation Measures
MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned Riverview Marketplace Commercial Project
Environmental Impact Report Findings
27 off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.

MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Cultural Resources (Archaeological Resources and Human Remains).

Geology and Soils (Paleontological Resources)
The Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. According to the Palaeontologic Overview, the geologic units underlying the Project Area (one mile radius around the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered Riverview Marketplace Commercial Project
Environmental Impact Report Findings
28 to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits. While the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant. Excavation activity associated with the development of the project area is unlikely to be paleontologically sensitive, but caution during development should be observed. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement Mitigation Measure (MM) GEO-1, Paleontological Discovery and Monitoring, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, impacts would be less than significant.

Mitigation Measures
MM GEO-1 Paleontological Discovery and Monitoring. In the event paleontological resources, including fossil discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and techniques, who is knowledgeable in the geology of California (preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The qualified paleontologist shall be empowered to halt or divert ground disturbing activities.

If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the remainder of ground disturbance for the Project. Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted. Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.

Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, Riverview Marketplace Commercial Project
Environmental Impact Report Findings
29 analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for permanent curation and storage. At the conclusion of laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Geology and Soils (Paleontological Resources).

Transportation (Emergency Access)
Construction
Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles. Additionally, the Project would include the preparation and implementation of a Construction Traffic Management Plan as a Project Design Feature (PDF).

The Construction Traffic Management Plan would be submitted to the City for review and approval prior to construction and would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures; provisions for maintaining pedestrian, bicycle, transit, and vehicular access to adjacent properties to the maximum extent feasible; methods to avoid or minimize lane closures and sidewalk closures; advance notification procedures for nearby property owners and affected agencies; dust, debris, and mud track-out control measures affecting adjacent roadways; and procedures to maintain emergency vehicle access at all times during construction. Implementation of the Construction Traffic Management Plan would reduce the potential for temporary construction-related conflicts with emergency response by ensuring that access is maintained, construction traffic is managed in an orderly manner, and potentially disruptive activities are coordinated in advance with the City and emergency service providers.

Operation
The Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the City and Fire Department. BFD would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements, which would enhance emergency access to the Project Site. Furthermore, compliance with the California fire Code and local ordinances would ensure that the Project would not impair an adopted Riverview Marketplace Commercial Project
Environmental Impact Report Findings
30 emergency response plan. Through compliance with access requirements and, adequate emergency access to the Project Site would be provided. Project impacts concerning emergency access would be less than significant.

Project Design Features
TRAF-PDF-1: Construction Traffic Management Plan.

The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans, among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfield for approval.

The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent feasible so as to avoid worker trips during those peak hours. • Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained. • Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. on weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be performed on Sundays and holidays.
• Reduce the potential of trucks waiting for extended periods to load or unload. • Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during traffic rerouting and deliveries. • Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and loading/unloading on the Project Site. • Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclists, and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public. • Identification of a construction manager and provision of a telephone number for any inquiries or complaints from residents regarding construction activities. The telephone Riverview Marketplace Commercial Project
Environmental Impact Report Findings
31 number shall be posted at the site, readily visible to any interested party during site preparation, grading, and construction.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a less than significant impact with mitigation incorporated with respect to Transportation (Emergency Access).

Tribal Cultural Resources
Although no Tribal Cultural Resources (TCRs) were identified in the Project Site, ground disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2 discussed above. With implementation of MM CUL-1 and MM CUL-2, impacts to TCRs would remain less than significant with mitigation incorporated.

VII. SIGNIFICANT AND UNAVOIDABLE IMPACTS
The EIR identified the following impacts that would remain significant and unavoidable even after implementation of all feasible mitigation measures. For these impacts, the City makes the finding pursuant to PRC Section 21081(a)(1) that changes or alterations have been required in, or incorporated into, the Project which mitigate the significant effects, and the finding pursuant to PRC Section 21081(a)(3) that specific economic, legal, social, technological, or other considerations make infeasible additional mitigation measures or project alternatives identified in the EIR.

A. Greenhouse Gases (GHG)
Operation of the Project would generate GHG emissions from vehicle trips, water demand, wastewater and solid waste generation, area sources (e.g., consumer cleaning products), energy usage (i.e., natural gas and electricity), and refrigerants. The Project’s primary source of project-related emissions would be from mobile-source emissions generated from Project vehicle trips (e.g., employees and patrons). The next largest sources of emissions would be from energy usage, followed by the solid waste and water sectors. Overall, development of the Project would generate annual operational phase GHG emissions of 16,027 MTCO2e per year under full buildout year conditions and would not achieve net zero GHG emissions Implementation of MM GHG-1 and GHG-3 would contribute to supporting and encouraging use of electricity instead of natural gas or other liquid fuels, which would minimize on-site generation of GHG emissions. Implementation of MM GHG-1 and GHG-3 would reduce project-related GHG emissions by 102 MTCO2e/yr. However, these two mitigation measures would not reduce Project-related emissions to achieve net zero. Overall, the other mitigation measures would help contribute to reducing operation-related Project GHG emissions to the extent feasible.

For example, MM GHG-2 would contribute to increasing use of carbon-free renewable electricity and supplement the on-site renewable electricity generated by the proposed on-site PV systems.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
32 Additionally, MM GHG-5 and GHG-6 would result in active and public transit facility improvements and promote active transit and public transit use, which would contribute to reducing passenger VMT. Furthermore, MM GHG-7 would result in increased EV charging infrastructure improvements and support use and adoption of EVs. Overall, although implementation of reduction measures would reduce Project-related GHG emissions to the extent feasible, operation of the proposed Project is still anticipated to generate GHG emissions and would not achieve the net zero threshold. Thus, Project-related GHG emissions would have a substantial cumulative contribution to GHG emissions impacts. Impacts would be significant and unavoidable.

Per the VMT analysis prepared, the Project has been designed to incorporate feasible VMT reducing strategies. The Project would include end-of-trip bicycle facilities such as bicycle parking and lockers. In addition, it also includes bicycle facility improvements as it proposes a new bicycle lane along Rosedale Highway, which would extend an existing facility and improve overall bicycle network connectivity. Furthermore, the Project includes pedestrian network improvements such as new sidewalks along its frontages. Aside from these Project-related design features, future commercial tenants of the proposed Project would be subject to the SJVAPCD Rule 9410 eTRIP rule. These Project improvements in addition to the SJVPACD eTRIP rule would contribute to reducing Project-generated VMT to the extent feasible.

Incorporation of MM GHG-5 and GHG-6, which would result in improvements for up to two bus stops and installation of an onsite end-of-trip shower facility, would also contribute to reducing project-generated VMT to the extent feasible by supporting public transit and bicycle use.

However, overall, the proposed Project would continue to be inconsistent with the Kern COG 2022 RTP/SCS. Impacts would be significant and unavoidable. No other feasible mitigation is available.

Mitigation Measures
MM GHG-1 The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.

MM GHG-2 Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such Riverview Marketplace Commercial Project
Environmental Impact Report Findings
33 plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime, but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.

MM GHG-3 All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.

MM GHG-4 Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.

Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.

MM GHG-5 The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.

MM GHG-6 The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
34 MM GHG-7 The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a significant and unavoidable impact with mitigation incorporated with respect to GHG.

B. Transportation (Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b))
The Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies that are consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with California Air Pollution Control Officers Association (CAPCOA) methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the Project’s location and operational characteristics. However, the reduction in VMT from the design features would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant impact. No other feasible mitigation is available.

Finding: The City finds that, based on substantial evidence in the record, the Project would result in a significant and unavoidable impact with VMT.

VIII. ALTERNATIVES
CEQA requires an EIR to describe a range of reasonable alternatives to the Project that would feasibly attain most of the basic objectives while reducing or avoiding significant impacts (CEQA Guidelines Section 15126.6). The analysis need not consider every conceivable alternative, but must consider a reasonable range. The lead agency may reject alternatives as infeasible.

A. Alternative 1: No Build/No Project Alternative
Impact Summary: Pursuant to Section 15126.6(e)(3)(B) of the CEQA Guidelines, Alternative 1, the “No Project” Alternative, represents the circumstance under which the Project does not proceed. Under Alternative 1, it is assumed that the existing state of the Project Site would remain as-is and no new development would be implemented. As discussed in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six- Riverview Marketplace Commercial Project
Environmental Impact Report Findings
35 feet tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Alternative 1 would avoid the Project’s significant and unavoidable impacts to Greenhouse Gas Emissions (GHG) and Transportation. Alternative 1 would also result in no impact in all other environmental topical areas analyzed in the Draft EIR. As the No Build/No Project alternative would not include a development program, the Alternative 1 would not meet any of the objectives of the Project.

Finding: The No Project Alternative is rejected as infeasible because it would not meet the underlying purpose of the Project or any of the Project’s basic objectives.

B. Alternative 2: Reduced Project Alternative
Impact Summary: The Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses. Accordingly, the total commercial square footage would be reduced from 405,531 square feet to approximately 304,148 square feet and the total number of dual sided fuel pumps would be reduced from 20 to 15. The buildings would be constructed in the same general arrangement as currently proposed and set forth in the site plan, but with a smaller footprint. The areas not covered by buildings would be used for surface parking for passenger vehicles and the site’s vehicular access would be the same general arrangement as currently proposed and set forth in the site plan. The development characteristics of this Reduced Project Alternative are assumed to be similar to those of the Project, including excavation and earth movement.

As the Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses, less development would occur and some of the environmental impacts would be reduced.

However, this Alternative would not eliminate the Project’s significant and unavoidable impacts.

With less development, the Project would meet the following objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
36 • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

However, with reduced development, Alternative 2 would not meet the following objective related to employment and job growth to the same extent as the Project:
• Creation of new and future employment opportunities.

Finding: Alternative 2 is rejected as infeasible because it would not avoid significant and unavoidable impacts, nor would it meet the Project’s objective related to employment and job growth to the same extent as the Project.

C. Alternative 3: Existing General Plan/Zoning Alternative Under Alternative 3, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, this alternative assumes the Project Site would be developed with a by-right use and no General Plan amendment or zone change is necessary. The Project Site’s current Public Facilities (P) designation, as well as the prohibitions in the deed restriction and restrictive covenant that encumber the property, significantly limit the types of uses permitted on the Project Site. Based on the site’s Public Facilities designation, the allowed uses are limited to the following:

Public Facilities (P): includes government buildings, hospitals, public utilities, cemeteries, sewage treatment plants, waste disposal sites and other publicly owned facilities.

For purposes of the analysis, the maximum allowable development of the Project Site is in accordance with the MBGP. Based thereon, Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices. All existing on-site uses, except the transmission facilities, would be removed to accommodate this alternative.

Under Alternative 3, the Project Site would be developed with approximately 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space, a 58,000 square foot laydown with detention basin, and a 5,300 square foot fueling facility. The alternative will also include 335,000 square feet of employee parking.1
1 This alternative project was derived and scaled based on input from the City’s Public Works Department of desired improvements on a new 30-acre public works yard.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
37 Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.

However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activitiesto the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.

Therefore, the future municipal maintenance and storage yard uses on the Project Site would not meet the following Project objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby. • New native and drought tolerant landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

Finding: Alternative 3 is rejected as infeasible because it would not meet several of the Project’s objectives related to employment and job growth, revitalization, and activity and aesthetic improvements to the same extent as the Project.

E. Alternative Rejected as Infeasible
Consideration was given to developing the Project, as proposed, on an alternative site within the City of Bakersfield. In considering this alternative, the following challenges were identified:

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
38 • The selection of any alternative site would have the same potentially significant impacts as the current Project site.
• Due to the Project Site’s unique characteristics, finding a comparable infill site of equal size is unlikely.
• An alternative site that is properly zoned and of equal size is not likely to meet the critical project objective of promoting favorable infill development. • An alternative site of adequate size would likely be outside of an established urban area, resulting in potentially increased impacts to traffic and greenhouse gas emissions. • The Applicant does not have ownership control of any alternative sites, rendering this alternative infeasible.

For these reasons, analysis of an alternative site was eliminated from further consideration in the EIR.

F. Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.

Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree
Of the alternatives analyzed in this Draft EIR, Alternative 1 would be considered the environmentally superior alternative because it would not involve new development and assumes that the Project Site would remain vacant under existing conditions. Although Alternative 1 would not meet any of the Project objectives, it would avoid all of the Project’s potentially significant impacts and significant and unavoidable impacts and would have reduced impacts compared to the Project. However, as Alternative 1 is a “no project” alternative which is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives
Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.

However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activitiesto the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site Riverview Marketplace Commercial Project
Environmental Impact Report Findings
39 to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
40 IX. SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES
Pursuant to CEQA Guidelines Section 15126.2(d), an EIR must identify any significant irreversible environmental changes that would be caused by the proposed project should it be implemented.

The following significant irreversible environmental changes would result from implementation of the Project:

As stated in Chapter 6, Other CEQA Considerations, of the Draft EIR, the Project would necessarily consume limited, slowly renewable, and non-renewable resources that could contribute to irreversible environmental changes. This consumption would occur during construction of the Project and would continue throughout its operational lifetime. The development of the Project would require a commitment of resources that would include: (1) building materials, (2) fuel and operational materials/resources, and (3) the transportation of goods and people to and from the Project Site.

With regard to building materials and solid waste, construction of the Project would require consumption of resources including certain types of lumber and other forest products, aggregate materials used in concrete and asphalt, metals, and petrochemical construction materials. The Project Site is currently vacant and therefore, no solid waste is currently being generated at the site. The Project would be served by the Metropolitan Sanitary Landfill/Bena Landfill, operated by the Kern County Public Works Department. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals. The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. During operation, using CalRecycle’s solid waste generation factor for commercial uses of approximately 13 pounds per 1,000 square foot per day, the Project’s 405,531 square feet of building area would generate approximately 5,272 pounds/day (2.6 tons/day), or 949 tons per year of solid waste. Consistent with State mandates (AB 939, AB 341, AB 1826, and SB 1383) and City programs, at least 50 percent of this material would be diverted through recycling and organics collection, resulting in an estimated disposal volume of 474 tons per year (1.3 tons/day) (Draft EIR, Section 4.18, Utilities and Service Systems, pages 4.18-15 through 4.18-17).

With regard to water, the Project is expected to increase water demand by 148,925 gallons per day. The Project’s contribution to the increase in water demand would fall within the available and projected water supplies reported in the City’s 2020 Urban Water Management Plan for the City for 2020 and the City’s projected 2040 water supply. Therefore, the Project would not result in a significant impact related to water supply.

With regard to energy consumption, during construction, fossil fuels would be consumed by on-road trucks and off-road construction equipment. Construction of the Project would not require electricity to power most construction equipment. The majority of construction equipment would be gasoline or diesel-powered. It is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Construction vehicles and Riverview Marketplace Commercial Project
Environmental Impact Report Findings
41 equipment would comply with CARB regulations and California emission standards. In addition, there are no unusual Project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities or equipment that would not conform to current emissions standards (and related fuel efficiencies).

During operation, would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting. Operation of the Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop solar photovoltaic (PV) systems and battery storage systems. Therefore, the Project would not cause wasteful, inefficient, and unnecessary consumption of energy (Draft EIR, Chapter 6, Other CEQA Considerations, pages 6- 1 through 6-3).

With regard to environmental hazards, construction of the Project would involve the use of hazardous substances in the form of paint, adhesives, solvents, and other substances typically used in building construction. However, all materials would be used, stored, and disposed of in accordance with applicable laws and regulations and manufacturers’ instructions. During operation, the use of hazardous materials would involve employing common maintenance and janitorial supplies, such as cleaners and solvents, paints and thinners for site maintenance, and other common chemicals. The limited quantities and nature of chemicals used by the Project for the generally commercial uses would not be considered significant. However, the proposed gas station and car wash would utilize hazardous materials regularly during operations. Gas station operations include the use of gasoline and diesel fuel, which are stored in underground storage tanks (USTs). During refueling, VOCs can be released as vapors, including benzene, toluene, ethyl-benzene, xylenes, and naphthalene. Often, fuel additives are also utilized at gas stations.

Additionally, carbon monoxide and formaldehyde are produced by vehicles at the station.

Propane tanks (exchange cages), motor oil, lubricants, battery fluids, and hydraulic fluids can also be released due to the nature of regular uses by automobiles. However, gas stations are heavily regulated by hazardous materials laws focusing on leak prevention, vapor recovery, and fire safety, overseen primarily by the CUPA. Operations of the car wash would be required to comply with hazardous material regulations under federal, state, and local laws, focusing on water protection, chemical handling, and waste disposal. The Project would be required to comply with the RCRA, which mandates "cradle-to-grave" control over hazardous waste, including oil, sludge, and certain soaps. Additionally, the OHSA Hazard Communication Standard (29 CFR Section 1910.1200) requires proper labelling, handling procedures, and worker training for handling chemicals. And finally, operations of the car wash would be required to comply with CCR Title 22, which requires secondary containment for chemicals and specific disposal protocols for car wash sludge. The use of these materials would be in accordance with the manufacturers’ specifications for use, storage, and disposal of such products which have been formulated to avoid substantial Riverview Marketplace Commercial Project
Environmental Impact Report Findings
42 exposure hazards. Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce the potential to release contaminants. Therefore, it is not expected that the Project would cause irreversible damage from environmental accidents associated with the use of typical, potentially hazardous materials (Draft EIR, Section 4.9, Hazards and Hazardous Materials, pages 4.9-12 through 4.9-13).

Based on the above, while Project construction and operation would require the irreversible commitment of limited, slowly renewable, and non-renewable resources, which would limit the availability of these resources for future generations, the consumption of such resources would not be considered substantial and would be consistent with regional and local growth forecasts and development goals for the area. The loss of such resources would not be highly accelerated when compared to existing conditions, and such resources would not be used in a wasteful manner. Therefore, although irreversible environmental changes would result from the Project, such changes are concluded to be less than significant, with the exception of the significant and unavoidable impact to GHG and VMT, and the limited use of nonrenewable resources that would be required by Project construction and operation is justified.

X. GROWTH INDUCING IMPACTS
CEQA Guidelines Section 15126.2(e) requires an EIR to discuss the ways a Project could foster economic or population growth or the construction of additional housing, directly or indirectly, in the surrounding environment. Growth-inducing impacts include the removal of obstacles to population growth (e.g., the expansion of a wastewater treatment plant allowing more development in a service area) and the development and construction of new service facilities that could significantly affect the environment individually or cumulatively. In addition, pursuant to CEQA, growth must not be assumed as beneficial, detrimental, or of little significance to the environment.

The Project Site is located in the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services. The Project Site is surrounded by existing commercial uses to the north, west, and east.

As discussed in Section 4.14, Population and Housing, of the Draft EIR, the Project proposes the development of a commercial retail center and does not include a residential component that would result in residents and population within the City. As such, the Project would not directly induce population growth.

The Project would not include components such as the extension of roads or existing infrastructure that would result in the indirect population growth within the City. It is anticipated Riverview Marketplace Commercial Project
Environmental Impact Report Findings
43 that construction workers and future employees of the Project would reside within the City and surrounding area, and commute to work. Although the operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Therefore, the Project would not induce substantial unplanned population growth and would not eliminate impediments to growth. Consequently, the Project would not foster growth inducing impacts.

XI. STATEMENT OF OVERRIDING CONSIDERATIONS
The EIR identifies unavoidable significant impacts that would result from implementation of the Project. PRC Section 21081 and CEQA Guidelines Section 15093(b) provide that when a decision of a public agency allows the occurrence of significant impacts that are identified in the EIR, but are not at least substantially mitigated to an insignificant level or eliminated, the lead agency must state in writing the reasons to support its action based on the EIR and/or other information in the record. The City is required to balance, as applicable, the economic, legal, social, technological, or other benefits of the proposed Project, including regionwide or statewide environmental benefits, against its unavoidable environmental risks when determining whether to approve the Project. The CEQA Guidelines require, pursuant to CEQA Guidelines Section 15093(b), that the decision-maker adopt a Statement of Overriding Considerations at the time of approval of a project if it finds that significant adverse environmental effects have been identified in the EIR that cannot be substantially mitigated to an insignificant level or be eliminated. These findings and the Statement of Overriding Considerations are based on the documents and materials that constitute the record of proceedings, including, but not limited to, the Final EIR and all technical appendices attached thereto.

Based on the analysis provided in Section IV, Environmental Impact Analysis, of the Draft EIR, implementation of the Project would result in significant impacts that cannot be feasibly mitigated with respect to: GHG emissions and VMT.

Accordingly, the City adopts the following Statement of Overriding Considerations. The City recognizes that significant and unavoidable impacts would result from implementation of the Project. Having (i) adopted all feasible mitigation measures, including Mitigation Measures GHG-1 through GHG-7, (ii) rejected as infeasible the alternatives to the Project discussed in Section VIII of these Findings, (iii) recognized all significant, unavoidable impacts, and (iv) balanced the benefits of the Project against the Project’s significant and unavoidable impacts, the City hereby finds that each of the Project’s benefits, as listed below, outweigh and override the significant unavoidable impacts relating to: GHG emissions and VMT.

The below stated reasons summarize the benefits, goals and objectives of the Project, and provide the detailed rationale for the benefits of the Project. These overriding considerations of Riverview Marketplace Commercial Project
Environmental Impact Report Findings
44 economic, social, aesthetic, and environmental benefits for the Project justify adoption of the Project and certification of the completed EIR. Each of the listed Project benefits set forth in this Statement of Overriding Considerations provides a separate and independent ground for the City’s decision to approve the Project despite the Project’s identified significant and unavoidable environmental impacts. Each of the following overriding considerations separately and independently (i) outweighs the adverse environmental impacts of the Project, and (ii) justifies adoption of the Project and certification of the completed EIR. In particular, achieving the underlying purpose for the Project would be sufficient to override the significant environmental impacts of the Project.

1. The Project Would Create Jobs and Enhance City Revenues: The Project would advance the City’s goals to provide employment opportunities, grow the City’s economic base, and increase the City’s revenues. Project construction would generate temporary construction employment for the local workforce. During operation, the Project would require approximately 969 employment opportunities for area residents. The new commercial uses would generate sales tax revenue and property tax revenue for the City.

2. The Project Would Revitalize an Underutilized Site: The Project would transform an underutilized site into an active infill commercial center that would create economic, retail, and service opportunities in an area served with existing infrastructure and public services. The Project would provide a modern commercial development with a variety of tenants that responds to the existing and future needs and demands of Bakersfield residents. Careful and judicious use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road Frontage and Rosedale Highway frontages would run a “dry creek” aesthetic feature composed of decorative cobbles and decomposed granite and crushed rocks. The Project would feature 325,120 square feet of new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian-oriented experience, and provide shade.

3. Sustainable Development
The Project would be an infill development that promotes the sustainable principles of smart growth. Compliance with state laws regarding water and energy conservation, including Title 24, would also result in increased efficiency and sustainability. Landscaping is anticipated to be native and drought-tolerant and would comply with the Model Water Efficient Landscape Ordinance (MWELO) per Section 17.61.060, Landscape Plan Requirements of the City of Bakersfield Municipal Code.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
45 2. Bicycle, Pedestrian, and Roadway Improvements: The Project would include several pedestrian and bicycle improvements. The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers, new sidewalks along its frontages, and a new bicycle lane along Rosedale Highway, which extends the existing facilities in the future.

The Project would include off-site improvements, including modification to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane and roadway striping).

For the existing signalized intersection of Rosedale Highway and Northwest Promenade, which is the street that provides vehicular access to the commercial retail center north of the Project Site, no improvements or modifications to the traffic signal poles/structures would occur. However, a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) would be modified to provide a dedicated left-turn lane for westbound traffic entering the Project Site at the signalized intersection. Other roadway improvements at this intersection would include striping.

The City finds that each of the Project benefits set forth above constitutes a separate and independent basis for overriding the significant and unavoidable environmental impact of the Project, which cannot be feasibly mitigated to less than significant. The City further finds that even if not every benefit identified above is achieved, each individual benefit is sufficient by itself to outweigh the significant and unavoidable impact. After balancing the specific economic, social, legal, and other considerable benefits of the proposed project, the City finds that the remaining significant and unavoidable environmental effects are acceptable due to the factors described in the Statement of Overriding Considerations above.

XII. GENERAL FINDINGS
• The City finds that the EIR for the Riverview Marketplace Project (General Plan Amendment No. 23-0001, Site Plan Review No. 22-0223, and Tentative Tract Map No. 7526; SCH No. 2025101507) was prepared in compliance with CEQA and the CEQA Guidelines. The EIR adequately addresses the environmental effects of the Project. • The City finds that it has independently reviewed and analyzed the EIR and that the EIR reflects the City’s independent judgment.
• The City finds that the responses to comments in the Final EIR adequately address the comments received during the public review period. To the extent that comments raised new environmental issues, those issues were addressed in the Final EIR. • The City finds that the Mitigation Monitoring Program (MMP) has been adopted for the Project. The MMP includes all mitigation measures and project design features identified in the EIR and establishes a monitoring program to ensure implementation and compliance.

Riverview Marketplace Commercial Project
Environmental Impact Report Findings
46 • The City finds that the custodian of documents and other materials that constitute the record of proceedings upon which the City’s decision is based is the Development Services Department – Planning Division, 1715 Chester Avenue, 2nd Floor, Bakersfield, California 93301.
• The City finds that the EIR provides adequate, good faith disclosure of environmental impacts as required by CEQA, including potentially significant impacts that cannot be feasibly mitigated to a less than significant level.
• The City hereby adopts these Findings in their entirety. To the extent that these Findings conclude that any proposed mitigation measure is feasible, the City hereby adopts such mitigation measures. Each of the mitigation measures adopted is enforceable through the MMP.

JET WAY

ESPRESSO DR

CAPPUCCINO
WAY

LATTE LN

SILVERLAKE DR

HOODSPORT AVE

COLVILLE AVE

STARSIDE DR

DELBERT ST
HENRY
LN
MOXEE
CT
NEAH
B
AY DR

CAPE FLATTERY DR

EL TORO VIEJO RD

SEABECK AVE

SUNCRISP LN

JENNA KATHRYN DR
ODESSA
CT

ICICLE CREEK DR

WOLF RIVER AVE

KENNEWICK LN

TELSTAR
AVE

LOON CT

GREENBANK
ST

COURTLAND
AVE

CRISPIN ST

PINK LADY
WAY

BELMAC AVE

HENRY LN

OLEO DR

ELZWORTH ST

STEAM CT

SEAVIEW DR

COFFEE FRONTAGE RD

SHOFNER AVE

LANGLEY RD

CHESAW CT

GREENACRES DR
MAX DR

MC INTOSH WAY

RIBSTON AVE

CHATTAROY ST

BOLERO AVE

CLAY PATRICK FARR WAY EL TORO VIEJO RD

GRANITE FALLS DR
COFFEE
RD

COFFEE RD

ROSEDALE HWY ROSEDALE HWY
SI
SI
SI
MC
MC
MC
MC
MC
MC
P
LMR
LMR
LMR
LMR

LMR LMR
LMR
LMR
LMR
LMR
LMR

LMR LMR
LMR
LMR
LMR
HI

GC GC HI
SI
SI
GC
GC
HMR
LI
LMR/LR
LMR/LR
LMR/LR
OS-P
MUC
MUC
MUC
PS
MC
MC
LR
LR LR
ER
MUC
MUC
MUC
MUC
MUC
MUC
MUC
MUC
HI HI
SI
SI
SI
SI
SI
SI
SI
SI
SI
LI
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
GC
SI
SI
SI
SI
SI
SI
SI
SI
SI
SI
GC
GC
LI
LR LR
LR LR
LR
HMR
OS-P
LI
LI
LI
LI
LR
LR
LR
SI

GREENACRES
PARK
Fruitvale
Junior High
School
BaseEditor_MV
0 350 700
Feet
_
GPA 23-0001

CITY OF BAKERSFIELD
GPA 23-0001
FROM: P
TO: LI
CITY
COUNTY
LEGEND
(GENERAL PLAN

LAND USE)
RR Rural Residential

2.5 gross acres/dwelling unit
ER Estate Residential
1 dwelling unit/net acre
SR Suburban Residential
≤4 dwelling units/net acre
SR/LR
County: ≤ 4 dwelling units/net acre
City: ≤ 7.26 dwelling units/net acre
LR Low Density Residential
≤ 7.26 dwelling units/net acre
LMR Low Medium Density Residential
> 4 but ≤ 10 dwelling units/net acre
HMR High Medium Density Residential
>7.26 units but
≤17.42 dwelling units/net acre
HR High Density Residential
>17.42 units but
≤72.6 dwelling units/net acre
HC Highway Commercial
GC General Commercial
MC Major Commercial
OC Office Commercial
MUC Mixed Use Commercial
LI Light Industrial
SI Service Industrial
HI Heavy Industrial
P Public Facilities
PS Public/Private Schools
PT Public Transportation Corridors
P-SW Solid Waste Facilities
OS Open Space
OS-P Parks and Recreation
OS-S Slopes exceeding 30%
R-IA Resource -
Intensive Agriculture
20 acre minimum parcel size
R-EA Resource -
Extensive Agriculture
20 acre minimum parcel size
80 acre min (Williamson Act)
R-MP Resource -
Minerals & Petroleum
5 acre minimum parcel size
UER Urban Estate Residential
Western Rosedale Plan

0.5 acre net minimum parcel size
WM West Ming Specific Plan
AE{
AEu
COUNTY
CITY
Exhibit C

Page 1 of 2 ends
← All documents from this meeting