Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 411 0 88 0 1648 724 385 1521 0 Future Volume (veh/h) 0 0 0 411 0 88 0 1648 724 385 1521 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 462 0 99 0 1852 813 433 1709 0 Peak Hour Factor 0.95 0.95 0.95 0.89 0.95 0.89 0.95 0.89 0.89 0.89 0.89 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 641 0 571 0 2334 1001 548 3518 0
Arrive On Green 0.00 0.00 0.00 0.18 0.00 0.18 0.00 0.45 0.45 0.16 0.68 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 462 0 99 0 1852 813 433 1709 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 6.7 0.0 1.4 0.0 16.9 21.6 6.6 8.8 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 6.7 0.0 1.4 0.0 16.9 21.6 6.6 8.8 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 641 0 571 0 2334 1001 548 3518 0 V/C Ratio(X) 0.00 0.00 0.00 0.72 0.00 0.17 0.00 0.79 0.81 0.79 0.49 0.00 Avail Cap(c_a), veh/h 0 236 0 1177 0 1687 0 2342 1003 571 3560 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 21.5 0.0 19.3 0.0 13.0 7.9 22.5 4.3 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 1.5 0.0 0.1 0.0 2.0 5.2 7.2 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 2.5 0.0 0.5 0.0 4.7 5.1 2.8 0.8 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 23.0 0.0 19.5 0.0 15.0 13.0 29.6 4.4 0.0 LnGrp LOS C B B B C A
Approach Vol, veh/h 0 561 2665 2142
Approach Delay, s/veh 0.0 22.4 14.4 9.5
Approach LOS C B A
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 12.6 28.9 13.8 0.0 41.6 13.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 9.0 25.0 18.0 7.0 38.0 29.0 Max Q Clear Time (g_c+I1), s 8.6 23.6 8.7 0.0 10.8 3.4
Green Ext Time (p_c), s 0.1 1.3 1.2 0.0 13.3 0.3
Intersection Summary
HCM 7th Control Delay, s/veh 13.3
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 166 324 63 199 522 344 243 1626 163 274 979 455 Future Volume (veh/h) 166 324 63 199 522 344 243 1626 163 274 979 455 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 187 364 71 224 587 387 273 1827 183 308 1100 511 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 222 1330 407 289 1429 438 338 2000 199 349 2180 677 Arrive On Green 0.06 0.26 0.26 0.08 0.28 0.28 0.10 0.42 0.42 0.10 0.42 0.42 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4794 478 3510 5187 1610 Grp Volume(v), veh/h 187 364 71 224 587 387 273 1315 695 308 1100 511 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1814 1755 1729 1610 Q Serve(g_s), s 5.8 6.2 3.8 6.9 10.2 25.8 8.4 39.6 40.0 9.6 17.3 29.8 Cycle Q Clear(g_c), s 5.8 6.2 3.8 6.9 10.2 25.8 8.4 39.6 40.0 9.6 17.3 29.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 222 1330 407 289 1429 438 338 1442 757 349 2180 677 V/C Ratio(X) 0.84 0.27 0.17 0.77 0.41 0.88 0.81 0.91 0.92 0.88 0.50 0.76 Avail Cap(c_a), veh/h 222 1360 417 381 1595 488 413 1470 771 349 2180 677 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 51.2 32.9 32.0 49.7 32.7 38.4 49.0 30.3 30.4 49.2 23.6 27.2 Incr Delay (d2), s/veh 24.2 0.1 0.2 7.1 0.2 16.2 9.4 8.8 15.8 22.2 0.2 4.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.2 2.5 1.5 3.2 4.2 11.5 4.0 16.5 19.0 5.1 6.5 11.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 75.4 33.0 32.2 56.8 32.9 54.6 58.4 39.2 46.2 71.3 23.8 32.1 LnGrp LOS E C C E C D E D D E C C
Approach Vol, veh/h 622 1198 2283 1919
Approach Delay, s/veh 45.7 44.4 43.6 33.6
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 50.1 13.1 32.4 14.7 50.5 11.0 34.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 47.0 12.0 29.0 13.0 45.0 7.0 34.0 Max Q Clear Time (g_c+I1), s 11.6 42.0 8.9 8.2 10.4 31.8 7.8 27.8 Green Ext Time (p_c), s 0.0 4.1 0.2 2.3 0.2 7.0 0.0 2.7 Intersection Summary
HCM 7th Control Delay, s/veh 40.8
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 200 0 248 0 0 0 107 625 0 0 1028 113 Future Volume (veh/h) 200 0 248 0 0 0 107 625 0 0 1028 113 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 217 0 270 0 0 0 116 679 0 0 1117 123 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 606 0 0 0 5 0 335 3137 0 0 2065 632
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.10 0.60 0.00 0.00 0.40 0.40 Sat Flow, veh/h 3510 217 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 217 13.5 0 0 0 116 679 0 0 1117 123 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 2.0 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.9 1.8 Cycle Q Clear(g_c), s 2.0 0.0 0.0 0.0 1.1 2.1 0.0 0.0 5.9 1.8 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 606 0 5 0 335 3137 0 0 2065 632
V/C Ratio(X) 0.36 0.00 0.00 0.00 0.35 0.22 0.00 0.00 0.54 0.19 Avail Cap(c_a), veh/h 2736 0 1534 0 489 4476 0 0 3176 973 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.1 0.0 0.0 0.0 15.2 3.2 0.0 0.0 8.3 7.1 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.6 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.3 0.0 0.0 0.0 1.1 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.5 0.0 0.0 0.0 15.8 3.3 0.0 0.0 8.5 7.2 LnGrp LOS B B A A A
Approach Vol, veh/h 0 795 1240
Approach Delay, s/veh 0.0 5.1 8.4
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 25.7 7.4 18.3 10.2 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.1 3.1 7.9 4.0 0.0
Green Ext Time (p_c), s 4.3 0.0 6.3 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.7
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 135 793 186 211 388 161 88 493 195 388 789 92 Future Volume (veh/h) 135 793 186 211 388 161 88 493 195 388 789 92 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 145 853 200 227 417 173 95 530 210 417 848 99 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 252 1534 466 273 1564 476 223 1156 353 545 1632 499 Arrive On Green 0.07 0.30 0.30 0.08 0.30 0.30 0.06 0.22 0.22 0.16 0.31 0.31 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 145 853 200 227 417 173 95 530 210 417 848 99 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 2.6 8.9 6.6 4.1 3.9 5.5 1.7 5.7 7.6 7.3 8.6 2.9 Cycle Q Clear(g_c), s 2.6 8.9 6.6 4.1 3.9 5.5 1.7 5.7 7.6 7.3 8.6 2.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 252 1534 466 273 1564 476 223 1156 353 545 1632 499 V/C Ratio(X) 0.57 0.56 0.43 0.83 0.27 0.36 0.43 0.46 0.59 0.77 0.52 0.20 Avail Cap(c_a), veh/h 273 2739 832 273 2739 833 327 2819 862 545 3142 961 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.9 19.1 18.3 29.3 17.1 17.6 29.0 21.7 22.4 26.1 18.1 16.1 Incr Delay (d2), s/veh 2.5 0.3 0.6 19.3 0.1 0.5 1.3 0.3 1.6 6.4 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 3.1 2.1 2.3 1.4 1.8 0.7 2.0 2.7 3.2 2.9 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 31.5 19.4 18.9 48.6 17.2 18.1 30.3 21.9 24.0 32.5 18.3 16.3 LnGrp LOS C B B D B B C C C C B B
Approach Vol, veh/h 1198 817 835 1364
Approach Delay, s/veh 20.8 26.1 23.4 22.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 18.3 9.0 23.0 8.1 24.3 8.6 23.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 35.0 5.0 34.0 6.0 39.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 9.3 9.6 6.1 10.9 3.7 10.6 4.6 7.5 Green Ext Time (p_c), s 0.1 4.0 0.0 6.4 0.0 6.1 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 22.9
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 57 87 185 88 36 71 99 695 63 52 1102 55 Future Volume (veh/h) 57 87 185 88 36 71 99 695 63 52 1102 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 64 98 208 99 40 80 111 781 71 58 1238 62 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 336 285 128 366 306 143 2069 628 94 1927 585 Arrive On Green 0.05 0.18 0.18 0.07 0.19 0.19 0.08 0.40 0.40 0.05 0.37 0.37 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 64 98 208 99 40 80 111 781 71 58 1238 62 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.1 2.7 7.3 3.2 1.0 2.6 3.6 6.4 1.7 1.9 11.7 1.5 Cycle Q Clear(g_c), s 2.1 2.7 7.3 3.2 1.0 2.6 3.6 6.4 1.7 1.9 11.7 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 99 336 285 128 366 306 143 2069 628 94 1927 585 V/C Ratio(X) 0.65 0.29 0.73 0.78 0.11 0.26 0.77 0.38 0.11 0.62 0.64 0.11 Avail Cap(c_a), veh/h 273 1243 1053 182 1147 958 212 2958 898 243 3045 925 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.6 21.3 23.2 27.2 19.9 20.5 26.9 12.7 11.3 27.7 15.5 12.3 Incr Delay (d2), s/veh 6.8 0.5 3.6 12.3 0.1 0.5 9.9 0.1 0.1 6.5 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.2 2.8 1.7 0.4 0.9 1.7 1.9 0.5 0.9 3.6 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.4 21.8 26.8 39.5 20.0 20.9 36.8 12.8 11.4 34.2 15.8 12.3 LnGrp LOS C C C D B C D B B C B B
Approach Vol, veh/h 370 219 963 1358
Approach Delay, s/veh 26.8 29.2 15.5 16.5
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.1 27.8 8.2 16.5 8.7 26.1 7.3 17.5 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 34.0 6.0 39.0 7.0 35.0 9.0 36.0 Max Q Clear Time (g_c+I1), s 3.9 8.4 5.2 9.3 5.6 13.7 4.1 4.6 Green Ext Time (p_c), s 0.0 5.3 0.0 1.3 0.0 8.4 0.0 0.5 Intersection Summary
HCM 7th Control Delay, s/veh 18.4
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 6 94 84 7 109 52
Future Vol, veh/h 6 94 84 7 109 52
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 6 99 88 7 115 55
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 349 48 0 0 96 0
Stage 1 92 - - - - -
Stage 2 257 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 622 1011 - - 1496 -
Stage 1 921 - - - - -
Stage 2 762 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 574 1011 - - 1496 -
Mov Cap-2 Maneuver 574 - - - - -
Stage 1 921 - - - - -
Stage 2 704 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 9.18 0 5.15

HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 967 1496 -
HCM Lane V/C Ratio - - 0.109 0.077 -
HCM Ctrl Dly (s/v) - - 9.2 7.6 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.4 0.2 -
* *1 h *
HCM 7th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1461 29 0 912 0 25
Future Vol, veh/h 1461 29 0 912 0 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1538 31 0 960 0 26
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 769
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 295
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 295
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.39

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 295 - - -
HCM Lane V/C Ratio 0.089 - - -
HCM Ctrl Dly (s/v) 18.4 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1450 28 0 957 0 24
Future Vol, veh/h 1450 28 0 957 0 24
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1526 29 0 1007 0 25
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 763
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 298
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 298
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.21

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 298 - - -
HCM Lane V/C Ratio 0.085 - - -
HCM Ctrl Dly (s/v) 18.2 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1347 21 0 956 0 38
Future Vol, veh/h 1347 21 0 956 0 38
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1418 22 0 1006 0 40
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 709
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 323
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 323
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 17.71

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 323 - - -
HCM Lane V/C Ratio 0.124 - - -
HCM Ctrl Dly (s/v) 17.7 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.4 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 19 0 1852 1679 36
Future Vol, veh/h 0 19 0 1852 1679 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 20 0 1949 1767 38
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 884 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 248 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 248 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 20.8 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 248 - -
HCM Lane V/C Ratio - 0.081 - -
HCM Ctrl Dly (s/v) - 20.8 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
I* 7
HCM 7th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 19 0 2067 1726 0
Future Vol, veh/h 0 19 0 2067 1726 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 20 0 2176 1817 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 908 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 239 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 239 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 21.46 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 239 - -
HCM Lane V/C Ratio - 0.084 - -
HCM Ctrl Dly (s/v) - 21.5 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
f ** **t
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 30 1023 12 3 1523 24 15 2 2 50 0 53 Future Volume (veh/h) 30 1023 12 3 1523 24 15 2 2 50 0 53 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 33 1112 13 3 1655 26 16 2 2 54 0 58 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 2518 29 7 2322 36 394 50 30 248 43 156
Arrive On Green 0.04 0.48 0.48 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5285 62 1810 5258 83 1132 261 155 536 225 818 Grp Volume(v), veh/h 33 728 397 3 1088 593 20 0 0 112 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1889 1810 1729 1883 1548 0 0 1579 0 0 Q Serve(g_s), s 0.7 5.1 5.1 0.1 9.4 9.4 0.0 0.0 0.0 0.2 0.0 0.0 Cycle Q Clear(g_c), s 0.7 5.1 5.1 0.1 9.4 9.4 0.3 0.0 0.0 2.1 0.0 0.0 Prop In Lane 1.00 0.03 1.00 0.04 0.80 0.10 0.48 0.52
Lane Grp Cap(c), veh/h 70 1648 900 7 1527 831 473 0 0 448 0 0 V/C Ratio(X) 0.47 0.44 0.44 0.40 0.71 0.71 0.04 0.00 0.00 0.25 0.00 0.00 Avail Cap(c_a), veh/h 247 1702 929 247 1702 927 1176 0 0 1196 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.2 6.3 6.3 18.2 8.3 8.3 12.1 0.0 0.0 12.8 0.0 0.0 Incr Delay (d2), s/veh 4.8 0.2 0.3 31.7 1.3 2.3 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 0.9 0.1 1.8 2.2 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.0 6.5 6.7 49.9 9.6 10.6 12.1 0.0 0.0 13.1 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1158 1684 20 112
Approach Delay, s/veh 7.0 10.0 12.1 13.1
Approach LOS A B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.2 21.4 11.0 5.4 20.2
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.3 2.1 7.1 4.1 2.7 11.4
Green Ext Time (p_c), s 0.0 0.0 4.9 0.5 0.0 4.8
Intersection Summary
HCM 7th Control Delay, s/veh 9.0
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 318 758 391 245 1025 244 405 1506 198 250 1289 235 Future Volume (veh/h) 318 758 391 245 1025 244 405 1506 198 250 1289 235 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 328 781 403 253 1057 252 418 1553 204 258 1329 242 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 371 1463 448 309 1372 562 464 1755 680 309 1527 638 Arrive On Green 0.11 0.30 0.30 0.09 0.28 0.28 0.14 0.36 0.36 0.09 0.31 0.31 Sat Flow, veh/h 3291 4863 1490 3291 4863 1488 3291 4863 1491 3291 4863 1491 Grp Volume(v), veh/h 328 781 403 253 1057 252 418 1553 204 258 1329 242 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1488 1646 1621 1491 1646 1621 1491 Q Serve(g_s), s 10.5 14.2 27.6 8.0 21.2 13.5 13.3 31.9 9.2 8.2 27.5 11.8 Cycle Q Clear(g_c), s 10.5 14.2 27.6 8.0 21.2 13.5 13.3 31.9 9.2 8.2 27.5 11.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 371 1463 448 309 1372 562 464 1755 680 309 1527 638 V/C Ratio(X) 0.88 0.53 0.90 0.82 0.77 0.45 0.90 0.88 0.30 0.83 0.87 0.38 Avail Cap(c_a), veh/h 371 1553 476 309 1462 589 464 1828 702 309 1599 660 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.5 31.0 35.7 47.3 35.0 24.9 45.0 31.9 18.3 47.4 34.5 20.9 Incr Delay (d2), s/veh 21.4 0.3 19.1 15.7 2.4 0.6 20.5 5.4 0.2 17.6 5.3 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.2 5.3 11.7 3.8 8.2 4.5 6.4 12.2 3.0 3.9 10.7 3.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 68.0 31.3 54.7 63.0 37.5 25.5 65.5 37.4 18.6 65.0 39.8 21.3 LnGrp LOS E C D E D C E D B E D C
Approach Vol, veh/h 1512 1562 2175 1829
Approach Delay, s/veh 45.5 39.7 41.0 40.9
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 42.4 14.0 36.0 19.0 37.4 16.0 34.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 40.0 10.0 34.0 15.0 35.0 12.0 32.0 Max Q Clear Time (g_c+I1), s 10.2 33.9 10.0 29.6 15.3 29.5 12.5 23.2 Green Ext Time (p_c), s 0.0 4.5 0.0 2.5 0.0 3.8 0.0 4.7 Intersection Summary
HCM 7th Control Delay, s/veh 41.7
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Project Dwy D/NW Promenade & Rosedale Highway 12/27/2025 Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 150 1257 118 142 1358 134 188 12 70 168 12 106 Future Volume (veh/h) 150 1257 118 142 1358 134 188 12 70 168 12 106 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1900 1870 1870 1870 1900 1870 1900 Adj Flow Rate, veh/h 155 1296 124 149 1400 138 198 13 74 182 0 109 Peak Hour Factor 0.97 0.97 0.95 0.95 0.97 0.97 0.95 0.95 0.95 0.97 0.95 0.97 Percent Heavy Veh, % 0 0 2 2 0 0 2 2 2 0 2 0
Cap, veh/h 266 1633 498 188 1785 554 245 16 92 414 0 184 Arrive On Green 0.08 0.31 0.31 0.11 0.34 0.34 0.20 0.20 0.20 0.11 0.00 0.11 Sat Flow, veh/h 3510 5187 1583 1781 5187 1609 1202 79 449 3619 0 1610 Grp Volume(v), veh/h 155 1296 124 149 1400 138 285 0 0 182 0 109 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1781 1729 1609 1729 0 0 1810 0 1610 Q Serve(g_s), s 2.6 14.0 3.6 5.0 14.8 3.8 9.6 0.0 0.0 2.9 0.0 3.9 Cycle Q Clear(g_c), s 2.6 14.0 3.6 5.0 14.8 3.8 9.6 0.0 0.0 2.9 0.0 3.9 Prop In Lane 1.00 1.00 1.00 1.00 0.69 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 266 1633 498 188 1785 554 353 0 0 414 0 184 V/C Ratio(X) 0.58 0.79 0.25 0.79 0.78 0.25 0.81 0.00 0.00 0.44 0.00 0.59 Avail Cap(c_a), veh/h 287 1780 543 204 1950 605 509 0 0 1065 0 474 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 27.3 19.1 15.6 26.7 18.0 14.4 23.2 0.0 0.0 25.3 0.0 25.7 Incr Delay (d2), s/veh 2.6 2.4 0.3 18.0 2.0 0.2 6.2 0.0 0.0 0.7 0.0 3.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 4.9 1.1 2.8 5.0 1.1 4.2 0.0 0.0 1.2 0.0 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.9 21.5 15.8 44.7 20.0 14.6 29.4 0.0 0.0 26.0 0.0 28.7 LnGrp LOS C C B D C B C C C
Approach Vol, veh/h 1575 1687 285 291
Approach Delay, s/veh 21.9 21.8 29.4 27.0
Approach LOS C C C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 16.5 10.4 23.3 11.0 8.6 25.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 18.0 7.0 21.0 18.0 5.0 23.0 Max Q Clear Time (g_c+I1), s 11.6 7.0 16.0 5.9 4.6 16.8 Green Ext Time (p_c), s 0.9 0.0 3.2 0.8 0.0 4.2
Intersection Summary
HCM 7th Control Delay, s/veh 22.8
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. " +++ 7 h 1 7 4 h 4 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 1266 161 60 1442 144 161 56 32 221 72 156 Future Volume (veh/h) 146 1266 161 60 1442 144 161 56 32 221 72 156 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 149 1292 164 61 1471 147 164 57 33 226 73 159 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 275 2202 683 98 2075 644 281 534 237 346 601 263 Arrive On Green 0.08 0.42 0.42 0.05 0.40 0.40 0.08 0.15 0.15 0.10 0.17 0.17 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1578 Grp Volume(v), veh/h 149 1292 164 61 1471 147 164 57 33 226 73 159 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1578 Q Serve(g_s), s 2.4 11.1 3.8 1.9 13.8 3.5 2.6 0.8 1.0 3.6 1.0 5.4 Cycle Q Clear(g_c), s 2.4 11.1 3.8 1.9 13.8 3.5 2.6 0.8 1.0 3.6 1.0 5.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 275 2202 683 98 2075 644 281 534 237 346 601 263 V/C Ratio(X) 0.54 0.59 0.24 0.63 0.71 0.23 0.58 0.11 0.14 0.65 0.12 0.60 Avail Cap(c_a), veh/h 302 2498 775 156 2498 775 302 1925 853 604 2235 977 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.8 12.8 10.7 26.9 14.6 11.5 25.8 21.5 21.6 25.2 20.6 22.5 Incr Delay (d2), s/veh 1.7 0.3 0.2 6.4 0.7 0.2 2.5 0.1 0.3 2.1 0.1 2.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 3.2 1.0 0.9 4.2 1.0 1.1 0.3 0.4 1.5 0.4 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.5 13.1 10.9 33.3 15.3 11.7 28.3 21.5 21.8 27.3 20.7 24.7 LnGrp LOS C B B C B B C C C C C C
Approach Vol, veh/h 1605 1679 254 458
Approach Delay, s/veh 14.2 15.7 26.0 25.4
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.7 12.6 7.1 28.7 8.6 13.7 8.5 27.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 31.0 5.0 28.0 5.0 36.0 5.0 28.0 Max Q Clear Time (g_c+I1), s 5.6 3.0 3.9 13.1 4.6 7.4 4.4 15.8 Green Ext Time (p_c), s 0.3 0.4 0.0 7.6 0.0 0.9 0.0 7.5 Intersection Summary
HCM 7th Control Delay, s/veh 16.9
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 240 983 367 281 678 191 325 1098 426 187 919 210 Future Volume (veh/h) 240 983 367 281 678 191 325 1098 426 187 919 210 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 242 993 371 284 685 193 328 1109 430 189 928 212 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 224 1511 468 262 1566 485 337 1736 539 261 1131 498 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.10 0.35 0.35 0.08 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 242 993 371 284 685 193 328 1109 430 189 928 212 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 6.0 15.6 19.8 7.0 9.8 8.8 8.7 16.8 22.6 4.9 22.2 9.8 Cycle Q Clear(g_c), s 6.0 15.6 19.8 7.0 9.8 8.8 8.7 16.8 22.6 4.9 22.2 9.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 224 1511 468 262 1566 485 337 1736 539 261 1131 498 V/C Ratio(X) 1.08 0.66 0.79 1.08 0.44 0.40 0.97 0.64 0.80 0.72 0.82 0.43 Avail Cap(c_a), veh/h 224 1768 548 262 1823 565 337 1989 617 337 1384 609 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.4 26.6 28.1 40.9 23.9 23.6 39.8 23.9 25.8 39.9 27.2 23.1 Incr Delay (d2), s/veh 82.6 0.7 6.8 80.1 0.2 0.5 42.1 0.6 6.5 5.4 3.4 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 5.6 7.4 5.6 3.5 2.9 5.3 5.9 8.2 2.1 8.6 3.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 123.9 27.4 34.9 121.0 24.1 24.1 81.9 24.5 32.3 45.4 30.6 23.7 LnGrp LOS F C C F C C F C C D C C
Approach Vol, veh/h 1606 1162 1867 1329
Approach Delay, s/veh 43.6 47.8 36.4 31.6
Approach LOS D D D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.0 35.4 11.0 31.3 13.0 33.4 10.0 32.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 36.0 7.0 32.0 9.0 36.0 6.0 33.0 Max Q Clear Time (g_c+I1), s 6.9 18.8 9.0 21.8 10.7 24.2 8.0 11.8 Green Ext Time (p_c), s 0.1 4.9 0.0 5.3 0.0 5.1 0.0 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 39.5
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 111 787 20 39 1043 302 47 38 40 202 46 114 Future Volume (veh/h) 111 787 20 39 1043 302 47 38 40 202 46 114 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 116 820 21 41 1086 315 49 40 42 210 48 119 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 149 2040 630 76 1274 565 86 262 221 263 448 379 Arrive On Green 0.08 0.39 0.39 0.04 0.35 0.35 0.05 0.14 0.14 0.15 0.24 0.24 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 116 820 21 41 1086 315 49 40 42 210 48 119 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.6 6.5 0.5 1.3 15.8 9.0 1.5 1.1 1.3 6.4 1.1 3.5 Cycle Q Clear(g_c), s 3.6 6.5 0.5 1.3 15.8 9.0 1.5 1.1 1.3 6.4 1.1 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 149 2040 630 76 1274 565 86 262 221 263 448 379 V/C Ratio(X) 0.78 0.40 0.03 0.54 0.85 0.56 0.57 0.15 0.19 0.80 0.11 0.31 Avail Cap(c_a), veh/h 159 2040 630 191 1397 620 159 835 703 382 1069 903 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.6 12.4 10.6 26.7 17.0 14.8 26.5 21.6 21.7 23.5 17.0 17.9 Incr Delay (d2), s/veh 20.3 0.1 0.0 5.9 4.9 0.9 5.9 0.3 0.4 7.4 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 1.9 0.1 0.6 5.9 2.7 0.7 0.4 0.4 3.0 0.5 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 45.9 12.6 10.6 32.6 22.0 15.7 32.4 21.8 22.1 30.9 17.1 18.4 LnGrp LOS D B B C C B C C C C B B
Approach Vol, veh/h 957 1442 131 377
Approach Delay, s/veh 16.6 20.9 25.9 25.2
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.3 11.8 6.4 26.4 6.7 17.4 8.7 24.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 25.0 6.0 21.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 8.4 3.3 3.3 8.5 3.5 5.5 5.6 17.8 Green Ext Time (p_c), s 0.2 0.3 0.0 4.1 0.0 0.6 0.0 2.2 Intersection Summary
HCM 7th Control Delay, s/veh 20.3
HCM 7th LOS C
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 20 811 87 148 768 18 115 32 142 44 19 4 Future Volume (veh/h) 20 811 87 148 768 18 115 32 142 44 19 4 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 21 845 91 154 800 19 120 33 148 46 20 4 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 46 1141 493 190 1429 633 154 369 312 87 299 249 Arrive On Green 0.03 0.32 0.32 0.11 0.40 0.40 0.09 0.19 0.19 0.05 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3610 1598 1810 1900 1605 1810 1900 1583 Grp Volume(v), veh/h 21 845 91 154 800 19 120 33 148 46 20 4 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1598 1810 1900 1605 1810 1900 1583 Q Serve(g_s), s 0.5 9.9 2.0 4.0 8.2 0.3 3.1 0.7 3.9 1.2 0.4 0.1 Cycle Q Clear(g_c), s 0.5 9.9 2.0 4.0 8.2 0.3 3.1 0.7 3.9 1.2 0.4 0.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 46 1141 493 190 1429 633 154 369 312 87 299 249 V/C Ratio(X) 0.46 0.74 0.18 0.81 0.56 0.03 0.78 0.09 0.47 0.53 0.07 0.02 Avail Cap(c_a), veh/h 190 1442 623 190 1442 638 190 959 810 228 999 832 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.9 14.5 11.8 20.8 11.2 8.8 21.3 15.7 17.0 22.1 17.1 16.9 Incr Delay (d2), s/veh 6.9 1.6 0.2 22.4 0.5 0.0 15.1 0.1 1.1 5.0 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 3.1 0.5 2.5 2.3 0.1 1.8 0.3 1.2 0.6 0.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.7 16.1 12.0 43.2 11.6 8.8 36.4 15.8 18.1 27.1 17.2 17.0 LnGrp LOS C B B D B A D B B C B B
Approach Vol, veh/h 957 973 301 70
Approach Delay, s/veh 16.0 16.6 25.2 23.7
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.3 13.2 9.0 19.0 8.0 11.5 5.2 22.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 24.0 5.0 19.0 5.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.2 5.9 6.0 11.9 5.1 2.4 2.5 10.2 Green Ext Time (p_c), s 0.0 0.5 0.0 2.8 0.0 0.0 0.0 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 17.7
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 278 2 644 522 533 559 316 1448 16 4 1823 321 Future Volume (veh/h) 278 2 644 522 533 559 316 1448 16 4 1823 321 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 288 0 664 609 450 576 326 1493 16 4 1879 331 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 555 0 493 847 445 753 340 2365 25 9 1843 572 Arrive On Green 0.16 0.00 0.16 0.24 0.24 0.24 0.10 0.46 0.46 0.01 0.37 0.37 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5126 55 1753 5025 1559 Grp Volume(v), veh/h 288 0 664 609 450 576 326 976 533 4 1879 331 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1831 1753 1675 1559 Q Serve(g_s), s 9.0 0.0 19.0 19.1 29.0 20.6 11.4 26.6 26.6 0.3 44.0 20.5 Cycle Q Clear(g_c), s 9.0 0.0 19.0 19.1 29.0 20.6 11.4 26.6 26.6 0.3 44.0 20.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 555 0 493 847 445 753 340 1546 845 9 1843 572 V/C Ratio(X) 0.52 0.00 1.35 0.72 1.01 0.76 0.96 0.63 0.63 0.44 1.02 0.58 Avail Cap(c_a), veh/h 555 0 493 847 445 753 340 1546 845 73 1843 572 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.3 0.0 50.5 41.8 45.5 42.3 53.8 24.6 24.6 59.5 38.0 30.6 Incr Delay (d2), s/veh 0.9 0.0 169.1 3.0 45.6 4.7 37.8 0.8 1.5 29.8 26.1 1.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.9 0.0 18.7 8.3 18.2 8.1 6.5 9.8 10.9 0.2 21.0 7.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 47.2 0.0 219.6 44.7 91.1 47.0 91.6 25.4 26.1 89.3 64.1 32.0 LnGrp LOS D F D F D F C C F F C
Approach Vol, veh/h 952 1635 1835 2214
Approach Delay, s/veh 167.4 58.3 37.3 59.3
Approach LOS F E D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.6 59.4 23.0 16.0 48.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 51.0 19.0 12.0 44.0 29.0 Max Q Clear Time (g_c+I1), s 2.3 28.6 21.0 13.4 46.0 31.0 Green Ext Time (p_c), s 0.0 9.7 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 68.5
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 612 58 74 947 51 53
Future Volume (veh/h) 612 58 74 947 51 53
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 658 62 80 1018 55 57
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1185 112 149 2082 120 124
Arrive On Green 0.36 0.36 0.08 0.58 0.14 0.14
Sat Flow, veh/h 3428 314 1810 3705 829 859
Grp Volume(v), veh/h 356 364 80 1018 113 0
Grp Sat Flow(s),veh/h/ln 1805 1842 1810 1805 1704 0
Q Serve(g_s), s 4.5 4.6 1.2 4.8 1.7 0.0
Cycle Q Clear(g_c), s 4.5 4.6 1.2 4.8 1.7 0.0
Prop In Lane 0.17 1.00 0.49 0.50
Lane Grp Cap(c), veh/h 642 655 149 2082 247 0
V/C Ratio(X) 0.55 0.56 0.54 0.49 0.46 0.00
Avail Cap(c_a), veh/h 1445 1474 567 4523 949 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.4 7.4 12.7 3.6 11.3 0.0
Incr Delay (d2), s/veh 0.8 0.7 3.0 0.2 1.3 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.8 0.4 0.1 0.6 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.2 8.2 15.7 3.8 12.6 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 720 1098 113
Approach Delay, s/veh 8.2 4.6 12.6
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 8.2 6.4 14.2 20.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 9.0 23.0 36.0
Max Q Clear Time (g_c+I1), s 3.7 3.2 6.6 6.8
Green Ext Time (p_c), s 0.2 0.1 3.5 7.3
Intersection Summary
HCM 7th Control Delay, s/veh 6.4
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 198 274 169 184 393 291 224 1397 118 207 1287 162 Future Volume (veh/h) 198 274 169 184 393 291 224 1397 118 207 1287 162 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 206 285 176 192 409 303 233 1455 123 216 1341 169 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 295 953 735 278 936 415 324 1782 545 332 1793 556 Arrive On Green 0.08 0.26 0.26 0.08 0.26 0.26 0.09 0.34 0.34 0.09 0.35 0.35 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 206 285 176 192 409 303 233 1455 123 216 1341 169 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.2 4.6 3.6 3.9 6.9 12.6 4.7 18.7 4.0 4.3 16.7 5.6 Cycle Q Clear(g_c), s 4.2 4.6 3.6 3.9 6.9 12.6 4.7 18.7 4.0 4.3 16.7 5.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 295 953 735 278 936 415 324 1782 545 332 1793 556 V/C Ratio(X) 0.70 0.30 0.24 0.69 0.44 0.73 0.72 0.82 0.23 0.65 0.75 0.30 Avail Cap(c_a), veh/h 336 1679 1295 288 1630 724 384 1916 586 336 1845 572 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.6 21.5 21.1 32.8 22.6 24.7 32.2 21.9 17.1 31.9 21.1 17.5 Incr Delay (d2), s/veh 5.4 0.2 0.2 6.6 0.3 2.5 5.2 2.7 0.2 4.3 1.7 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 1.7 1.1 1.8 2.6 4.5 2.1 6.9 1.3 1.9 6.0 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.0 21.7 21.3 39.4 22.9 27.2 37.4 24.6 17.3 36.2 22.8 17.8 LnGrp LOS D C C D C C D C B D C B
Approach Vol, veh/h 667 904 1811 1726
Approach Delay, s/veh 26.6 27.9 25.8 24.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 29.1 9.8 23.3 10.8 29.3 10.1 22.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 27.0 6.0 34.0 8.0 26.0 7.0 33.0 Max Q Clear Time (g_c+I1), s 6.3 20.7 5.9 6.6 6.7 18.7 6.2 14.6 Green Ext Time (p_c), s 0.0 4.4 0.0 2.3 0.1 4.8 0.1 3.2 Intersection Summary
HCM 7th Control Delay, s/veh 25.6
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 527 27 60 710 32 35 3 82 16 4 11 Future Volume (veh/h) 10 527 27 60 710 32 35 3 82 16 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 579 30 66 780 35 38 3 90 18 4 12 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 1003 432 155 1208 54 252 20 241 137 30 91 Arrive On Green 0.02 0.28 0.28 0.09 0.34 0.34 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1555 1810 3513 158 1683 133 1607 922 205 615 Grp Volume(v), veh/h 11 579 30 66 401 414 41 0 90 34 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1555 1810 1805 1866 1816 0 1607 1742 0 0 Q Serve(g_s), s 0.3 6.5 0.7 1.6 8.8 8.9 0.9 0.0 2.4 0.8 0.0 0.0 Cycle Q Clear(g_c), s 0.3 6.5 0.7 1.6 8.8 8.9 0.9 0.0 2.4 0.8 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.08 0.93 1.00 0.53 0.35
Lane Grp Cap(c), veh/h 36 1003 432 155 621 641 272 0 241 258 0 0 V/C Ratio(X) 0.31 0.58 0.07 0.42 0.65 0.65 0.15 0.00 0.37 0.13 0.00 0.00 Avail Cap(c_a), veh/h 268 2138 921 268 1069 1105 845 0 748 258 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.8 14.7 12.6 20.5 13.1 13.1 17.5 0.0 18.1 17.5 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.5 0.1 1.8 1.1 1.1 0.3 0.0 1.0 0.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 0.2 0.6 2.7 2.8 0.3 0.0 0.8 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.5 15.2 12.6 22.3 14.2 14.2 17.7 0.0 19.1 17.7 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 620 881 131 34
Approach Delay, s/veh 15.3 14.8 18.6 17.7
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 8.1 17.1 11.0 4.9 20.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.4 3.6 8.5 2.8 2.3 10.9
Green Ext Time (p_c), s 0.4 0.0 3.4 0.0 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 15.4
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 24 277 161 247 314 86 159 174 195 52 98 13 Future Volume (veh/h) 24 277 161 247 314 86 159 174 195 52 98 13 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 25 289 168 257 327 90 166 181 203 54 102 14 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 70 559 249 353 782 349 258 853 670 118 711 98 Arrive On Green 0.04 0.15 0.15 0.10 0.22 0.22 0.07 0.45 0.45 0.07 0.44 0.44 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1493 1810 1614 222 Grp Volume(v), veh/h 25 289 168 257 327 90 166 181 203 54 0 116 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1493 1810 0 1836 Q Serve(g_s), s 0.9 5.1 6.8 4.9 5.4 3.2 3.2 4.0 6.0 2.0 0.0 2.6 Cycle Q Clear(g_c), s 0.9 5.1 6.8 4.9 5.4 3.2 3.2 4.0 6.0 2.0 0.0 2.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 70 559 249 353 782 349 258 853 670 118 0 809 V/C Ratio(X) 0.36 0.52 0.67 0.73 0.42 0.26 0.64 0.21 0.30 0.46 0.00 0.14 Avail Cap(c_a), veh/h 183 1301 580 405 1353 603 405 931 732 183 0 873 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 32.5 26.9 27.7 30.3 23.4 22.5 31.3 11.6 12.2 31.2 0.0 11.6 Incr Delay (d2), s/veh 3.1 0.7 3.2 5.6 0.4 0.4 2.7 0.1 0.3 2.7 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 2.0 2.6 2.2 2.1 1.1 1.3 1.4 1.6 0.9 0.0 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.6 27.7 30.8 35.9 23.8 22.9 33.9 11.8 12.4 34.0 0.0 11.7 LnGrp LOS D C C D C C C B B C B
Approach Vol, veh/h 482 674 550 170
Approach Delay, s/veh 29.2 28.3 18.7 18.8
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.5 35.1 11.0 14.7 9.1 34.6 6.7 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 34.0 8.0 25.0 8.0 33.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 4.0 8.0 6.9 8.8 5.2 4.6 2.9 7.4 Green Ext Time (p_c), s 0.0 1.6 0.1 1.9 0.1 0.5 0.0 2.0 Intersection Summary
HCM 7th Control Delay, s/veh 24.8
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 348 45 55 339 93 38 33 57 113 31 53 Future Volume (veh/h) 42 348 45 55 339 93 38 33 57 113 31 53 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 43 359 46 57 349 96 39 34 59 116 32 55 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 87 762 338 108 804 356 156 399 336 328 492 410 Arrive On Green 0.05 0.21 0.21 0.06 0.22 0.22 0.04 0.21 0.21 0.09 0.26 0.26 Sat Flow, veh/h 1810 3610 1599 1810 3610 1599 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 43 359 46 57 349 96 39 34 59 116 32 55 Grp Sat Flow(s),veh/h/ln 1810 1805 1599 1810 1805 1599 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 0.9 3.3 0.9 1.1 3.1 1.9 0.4 0.5 1.1 1.2 0.5 1.0 Cycle Q Clear(g_c), s 0.9 3.3 0.9 1.1 3.1 1.9 0.4 0.5 1.1 1.2 0.5 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 87 762 338 108 804 356 156 399 336 328 492 410 V/C Ratio(X) 0.49 0.47 0.14 0.53 0.43 0.27 0.25 0.09 0.18 0.35 0.07 0.13 Avail Cap(c_a), veh/h 289 2499 1107 337 2595 1150 467 1770 1494 561 1821 1518 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.4 13.0 12.0 17.1 12.6 12.1 17.3 11.9 12.2 16.0 10.5 10.7 Incr Delay (d2), s/veh 4.3 0.5 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.6 0.1 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.9 0.2 0.5 0.9 0.5 0.1 0.2 0.3 0.4 0.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.7 13.4 12.2 21.1 12.9 12.5 18.2 12.0 12.4 16.6 10.6 10.8 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 448 502 132 203
Approach Delay, s/veh 14.1 13.8 14.0 14.1
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 11.9 6.2 11.9 5.7 13.7 5.8 12.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 35.0 7.0 26.0 5.0 36.0 6.0 27.0 Max Q Clear Time (g_c+I1), s 3.2 3.1 3.1 5.3 2.4 3.0 2.9 5.1 Green Ext Time (p_c), s 0.1 0.3 0.0 2.1 0.0 0.3 0.0 2.2 Intersection Summary
HCM 7th Control Delay, s/veh 14.0
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 40 144 206 102 235 144 445 1287 158 151 1027 64 Future Volume (veh/h) 40 144 206 102 235 144 445 1287 158 151 1027 64 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 41 147 210 104 240 147 454 1313 161 154 1048 65 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 145 670 298 242 1106 338 571 2076 636 271 1632 500 Arrive On Green 0.04 0.19 0.19 0.07 0.21 0.21 0.16 0.40 0.40 0.08 0.31 0.31 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 41 147 210 104 240 147 454 1313 161 154 1048 65 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.7 2.1 7.3 1.7 2.3 4.8 7.4 12.1 4.0 2.5 10.4 1.7 Cycle Q Clear(g_c), s 0.7 2.1 7.3 1.7 2.3 4.8 7.4 12.1 4.0 2.5 10.4 1.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 145 670 298 242 1106 338 571 2076 636 271 1632 500 V/C Ratio(X) 0.28 0.22 0.70 0.43 0.22 0.43 0.79 0.63 0.25 0.57 0.64 0.13 Avail Cap(c_a), veh/h 294 1996 889 353 2955 903 647 3042 932 294 2520 772 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.8 20.6 22.8 26.7 19.4 20.4 24.0 14.4 11.9 26.6 17.6 14.6 Incr Delay (d2), s/veh 1.1 0.2 3.0 1.2 0.1 0.9 6.1 0.3 0.2 2.2 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.8 2.6 0.7 0.8 1.6 3.1 3.7 1.1 1.0 3.4 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.8 20.8 25.8 27.9 19.5 21.2 30.1 14.7 12.2 28.8 18.0 14.7 LnGrp LOS C C C C B C C B B C B B
Approach Vol, veh/h 398 491 1928 1267
Approach Delay, s/veh 24.3 21.8 18.1 19.1
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.6 27.9 8.1 15.1 13.7 22.8 6.5 16.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 11.0 29.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 4.5 14.1 3.7 9.3 9.4 12.4 2.7 6.8 Green Ext Time (p_c), s 0.0 9.3 0.0 1.4 0.3 6.3 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.5
HCM 7th LOS B
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 464 149 201 827 43 248 681 191 67 650 83 Future Volume (veh/h) 42 464 149 201 827 43 248 681 191 67 650 83 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 44 488 157 212 871 45 261 717 201 71 684 87 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 1050 467 316 1180 61 365 1093 484 200 1327 409 Arrive On Green 0.04 0.29 0.29 0.09 0.34 0.34 0.10 0.30 0.30 0.06 0.26 0.26 Sat Flow, veh/h 3510 3610 1607 3510 3492 180 3510 3610 1599 3510 5187 1597 Grp Volume(v), veh/h 44 488 157 212 450 466 261 717 201 71 684 87 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1867 1755 1805 1599 1755 1729 1597 Q Serve(g_s), s 0.7 6.8 4.7 3.6 13.6 13.6 4.4 10.7 6.2 1.2 7.0 2.6 Cycle Q Clear(g_c), s 0.7 6.8 4.7 3.6 13.6 13.6 4.4 10.7 6.2 1.2 7.0 2.6 Prop In Lane 1.00 1.00 1.00 0.10 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 1050 467 316 610 631 365 1093 484 200 1327 409 V/C Ratio(X) 0.29 0.46 0.34 0.67 0.74 0.74 0.71 0.66 0.42 0.35 0.52 0.21 Avail Cap(c_a), veh/h 285 1697 755 398 907 938 398 1931 855 285 2607 803 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.6 17.9 17.2 27.2 18.0 18.0 26.8 18.7 17.1 28.0 19.7 18.1 Incr Delay (d2), s/veh 1.1 0.3 0.4 3.0 1.8 1.7 5.4 0.7 0.6 1.1 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.5 1.6 1.5 5.1 5.3 1.9 3.7 2.1 0.5 2.3 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.7 18.3 17.6 30.2 19.8 19.7 32.2 19.4 17.7 29.1 20.0 18.3 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 689 1128 1179 842
Approach Delay, s/veh 18.8 21.7 21.9 20.6
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.5 22.7 9.6 21.9 10.4 19.8 6.6 24.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 7.0 29.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.2 12.7 5.6 8.8 6.4 9.0 2.7 15.6 Green Ext Time (p_c), s 0.0 4.8 0.1 3.5 0.1 4.3 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 21.0
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 124 505 137 189 709 88 345 959 211 151 798 116 Future Volume (veh/h) 124 505 137 189 709 88 345 959 211 151 798 116 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 129 526 143 197 739 92 359 999 220 157 831 121 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 245 1459 445 272 1499 451 460 1662 515 256 1359 422 Arrive On Green 0.07 0.28 0.28 0.08 0.29 0.29 0.13 0.32 0.32 0.07 0.26 0.26 Sat Flow, veh/h 3510 5187 1583 3510 5187 1562 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 129 526 143 197 739 92 359 999 220 157 831 121 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1562 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 2.3 5.2 4.6 3.5 7.6 2.9 6.4 10.5 6.9 2.8 9.1 3.9 Cycle Q Clear(g_c), s 2.3 5.2 4.6 3.5 7.6 2.9 6.4 10.5 6.9 2.8 9.1 3.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 245 1459 445 272 1499 451 460 1662 515 256 1359 422 V/C Ratio(X) 0.53 0.36 0.32 0.72 0.49 0.20 0.78 0.60 0.43 0.61 0.61 0.29 Avail Cap(c_a), veh/h 272 2493 761 272 2493 751 490 2814 873 435 2734 848 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.0 18.5 18.3 29.1 19.0 17.3 27.1 18.5 17.3 29.0 20.9 19.0 Incr Delay (d2), s/veh 1.7 0.2 0.4 9.2 0.3 0.2 7.5 0.4 0.6 2.4 0.4 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 1.8 1.5 1.7 2.6 0.9 2.8 3.4 2.2 1.1 3.1 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.7 18.7 18.7 38.3 19.3 17.5 34.6 18.8 17.8 31.4 21.4 19.4 LnGrp LOS C B B D B B C B B C C B
Approach Vol, veh/h 798 1028 1578 1109
Approach Delay, s/veh 20.6 22.8 22.3 22.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 24.7 9.0 22.1 12.5 20.9 8.5 22.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 35.0 5.0 31.0 9.0 34.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 4.8 12.5 5.5 7.2 8.4 11.1 4.3 9.6 Green Ext Time (p_c), s 0.1 7.1 0.0 3.8 0.1 5.5 0.0 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 22.2
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/27/2025 Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 66 204 256 124 78 234 1274 194 24 1090 29 Future Volume (veh/h) 67 66 204 256 124 78 234 1274 194 24 1090 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 69 68 210 264 128 80 241 1313 200 25 1124 30 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 93 345 285 309 572 475 285 1835 279 49 1420 439 Arrive On Green 0.05 0.18 0.18 0.17 0.30 0.30 0.16 0.40 0.40 0.03 0.27 0.27 Sat Flow, veh/h 1810 1900 1571 1810 1900 1579 1810 4540 692 1810 5187 1604 Grp Volume(v), veh/h 69 68 210 264 128 80 241 1000 513 25 1124 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1579 1810 1729 1774 1810 1729 1604 Q Serve(g_s), s 2.8 2.2 9.3 10.5 3.7 2.8 9.6 17.9 17.9 1.0 14.8 1.0 Cycle Q Clear(g_c), s 2.8 2.2 9.3 10.5 3.7 2.8 9.6 17.9 17.9 1.0 14.8 1.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.39 1.00 1.00
Lane Grp Cap(c), veh/h 93 345 285 309 572 475 285 1397 717 49 1420 439 V/C Ratio(X) 0.74 0.20 0.74 0.86 0.22 0.17 0.85 0.72 0.72 0.51 0.79 0.07 Avail Cap(c_a), veh/h 196 566 468 367 746 620 343 1498 768 122 1615 499 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.6 25.7 28.6 29.8 19.4 19.0 30.2 18.5 18.5 35.4 24.9 19.9 Incr Delay (d2), s/veh 11.1 0.3 3.7 15.5 0.2 0.2 15.2 1.5 3.0 7.9 2.5 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 1.0 3.5 5.5 1.5 0.9 4.9 6.1 6.5 0.5 5.5 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 45.7 25.9 32.3 45.3 19.6 19.2 45.4 20.0 21.4 43.4 27.3 19.9 LnGrp LOS D C C D B B D B C D C B
Approach Vol, veh/h 347 472 1754 1179
Approach Delay, s/veh 33.7 33.9 23.9 27.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.0 33.9 16.6 17.4 15.6 24.2 7.8 26.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 32.0 15.0 22.0 14.0 23.0 8.0 29.0 Max Q Clear Time (g_c+I1), s 3.0 19.9 12.5 11.3 11.6 16.8 4.8 5.7 Green Ext Time (p_c), s 0.0 6.9 0.2 0.7 0.2 3.4 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 27.2
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 47 20 87 133 34 101 87 1552 97 80 1464 41 Future Volume (veh/h) 47 20 87 133 34 101 87 1552 97 80 1464 41 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.97 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 48 21 90 137 35 104 90 1600 100 82 1509 42 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 89 45 193 307 345 288 132 1898 587 125 1880 569 Arrive On Green 0.05 0.14 0.14 0.09 0.18 0.18 0.07 0.37 0.37 0.07 0.36 0.36 Sat Flow, veh/h 1810 314 1344 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 48 0 111 137 35 104 90 1600 100 82 1509 42 Grp Sat Flow(s),veh/h/ln 1810 0 1658 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 1.2 0.0 2.9 1.8 0.7 2.7 2.3 13.6 2.0 2.1 12.5 0.8 Cycle Q Clear(g_c), s 1.2 0.0 2.9 1.8 0.7 2.7 2.3 13.6 2.0 2.1 12.5 0.8 Prop In Lane 1.00 0.81 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 89 0 238 307 345 288 132 1898 587 125 1880 569 V/C Ratio(X) 0.54 0.00 0.47 0.45 0.10 0.36 0.68 0.84 0.17 0.65 0.80 0.07 Avail Cap(c_a), veh/h 189 0 900 366 1031 862 189 1949 602 189 1949 590 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.2 0.0 18.8 20.8 16.3 17.2 21.7 13.9 10.3 21.7 13.7 10.0 Incr Delay (d2), s/veh 5.0 0.0 1.4 1.0 0.1 0.8 6.1 3.5 0.1 5.6 2.5 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 1.0 0.7 0.3 0.9 1.0 4.0 0.5 0.9 3.6 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.2 0.0 20.3 21.8 16.5 17.9 27.8 17.4 10.4 27.4 16.2 10.1 LnGrp LOS C C C B B C B B C B B
Approach Vol, veh/h 159 276 1790 1633
Approach Delay, s/veh 22.4 19.7 17.5 16.6
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 21.5 8.2 10.9 7.5 21.4 6.4 12.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.1 15.6 3.8 4.9 4.3 14.5 3.2 4.7 Green Ext Time (p_c), s 0.0 2.0 0.0 0.5 0.0 2.6 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 17.5
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 258 0 160 0 0 0 302 1565 0 0 1447 254 Future Volume (veh/h) 258 0 160 0 0 0 302 1565 0 0 1447 254 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 263 0 163 0 0 0 308 1597 0 0 1477 259 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 892 0 270 0 318 0 373 3442 0 0 1935 601
Arrive On Green 0.17 0.00 0.17 0.00 0.00 0.00 0.21 0.66 0.00 0.00 0.37 0.37 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 263 0 163 0 0 0 308 1597 0 0 1477 259 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.2 0.0 4.4 0.0 0.0 0.0 7.7 7.1 0.0 0.0 11.8 5.7 Cycle Q Clear(g_c), s 3.2 0.0 4.4 0.0 0.0 0.0 7.7 7.1 0.0 0.0 11.8 5.7 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 892 0 270 0 318 0 373 3442 0 0 1935 601 V/C Ratio(X) 0.29 0.00 0.60 0.00 0.00 0.00 0.83 0.46 0.00 0.00 0.76 0.43 Avail Cap(c_a), veh/h 1936 0 749 0 883 0 459 3836 0 0 2082 646 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 17.7 0.0 18.2 0.0 0.0 0.0 18.0 3.9 0.0 0.0 13.0 11.1 Incr Delay (d2), s/veh 0.2 0.0 2.2 0.0 0.0 0.0 9.9 0.1 0.0 0.0 1.6 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 0.0 1.5 0.0 0.0 0.0 3.4 0.4 0.0 0.0 3.2 1.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.9 0.0 20.4 0.0 0.0 0.0 27.9 4.0 0.0 0.0 14.6 11.6 LnGrp LOS B C C A B B
Approach Vol, veh/h 426 0 1905 1736
Approach Delay, s/veh 18.9 0.0 7.8 14.2
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 35.4 11.9 13.7 21.7 11.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 12.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 9.1 6.4 9.7 13.8 0.0
Green Ext Time (p_c), s 11.9 1.5 0.2 3.8 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.7
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/03/2026
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 81 0 397 89 0 74 446 1863 107 14 1859 81 Future Volume (veh/h) 81 0 397 89 0 74 446 1863 107 14 1859 81 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 520 96 0 80 480 2003 115 15 1999 87 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 252 427 210 0 214 517 3626 1103 32 2211 676 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.29 0.70 0.70 0.02 0.43 0.43 Sat Flow, veh/h 0 1870 3170 896 0 1585 1781 5187 1577 1810 5187 1585 Grp Volume(v), veh/h 0 0 520 96 0 80 480 2003 115 15 1999 87 Grp Sat Flow(s),veh/h/ln 0 1870 1585 896 0 1585 1781 1729 1577 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 10.9 8.4 0.0 3.7 21.2 15.3 1.9 0.7 29.1 2.7 Cycle Q Clear(g_c), s 0.0 0.0 10.9 8.4 0.0 3.7 21.2 15.3 1.9 0.7 29.1 2.7 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 252 427 210 0 214 517 3626 1103 32 2211 676 V/C Ratio(X) 0.00 0.00 1.22 0.46 0.00 0.37 0.93 0.55 0.10 0.47 0.90 0.13 Avail Cap(c_a), veh/h 0 416 706 289 0 353 551 3626 1103 112 2246 686 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 35.0 33.9 0.0 31.9 27.8 6.0 3.9 39.3 21.6 14.1 Incr Delay (d2), s/veh 0.0 0.0 110.2 1.6 0.0 1.1 21.4 0.2 0.0 10.3 5.6 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 10.6 1.8 0.0 1.4 10.9 3.0 0.4 0.4 10.8 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 145.1 35.4 0.0 33.0 49.3 6.1 4.0 49.6 27.3 14.2 LnGrp LOS F D C D A A D C B
Approach Vol, veh/h 520 176 2598 2101
Approach Delay, s/veh 145.1 34.3 14.0 26.9
Approach LOS F C B C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.4 60.5 14.9 27.5 38.5 14.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 55.0 18.0 25.0 35.0 18.0 Max Q Clear Time (g_c+I1), s 2.7 17.3 0.0 23.2 31.1 10.4 Green Ext Time (p_c), s 0.0 20.2 0.0 0.3 3.4 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 32.3
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 290 168 0 1989 1898 693
Future Volume (veh/h) 290 168 0 1989 1898 693
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 310 156 0 2030 1937 0
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 575 256 0 3416 3416
Arrive On Green 0.16 0.16 0.00 0.66 0.66 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 310 156 0 2030 1937 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 3.5 4.0 0.0 9.6 8.9 0.0
Cycle Q Clear(g_c), s 3.5 4.0 0.0 9.6 8.9 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 575 256 0 3416 3416
V/C Ratio(X) 0.54 0.61 0.00 0.59 0.57
Avail Cap(c_a), veh/h 907 404 0 4848 4848
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 17.0 17.2 0.0 4.2 4.1 0.0
Incr Delay (d2), s/veh 0.8 2.3 0.0 0.2 0.1 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 1.4 0.0 0.2 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.8 19.5 0.0 4.4 4.2 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 466 2030 1937
Approach Delay, s/veh 18.3 4.4 4.2
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 32.9 11.0 32.9
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 41.0 11.0 41.0
Max Q Clear Time (g_c+I1), s 11.6 6.0 10.9
Green Ext Time (p_c), s 17.3 0.8 16.5
Intersection Summary
HCM 7th Control Delay, s/veh 5.8
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 907 0 277 0 1715 397 238 1805 0 Future Volume (veh/h) 0 0 0 907 0 277 0 1715 397 238 1805 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 945 0 289 0 1786 414 248 1880 0 Peak Hour Factor 0.95 0.95 0.95 0.96 0.95 0.96 0.95 0.96 0.96 0.96 0.96 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 1087 0 967 0 2146 1142 334 2970 0
Arrive On Green 0.00 0.00 0.00 0.30 0.00 0.30 0.00 0.41 0.41 0.10 0.57 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 945 0 289 0 1786 414 248 1880 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 15.6 0.0 4.3 0.0 19.4 6.3 4.3 15.3 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 15.6 0.0 4.3 0.0 19.4 6.3 4.3 15.3 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 1087 0 967 0 2146 1142 334 2970 0 V/C Ratio(X) 0.00 0.00 0.00 0.87 0.00 0.30 0.00 0.83 0.36 0.74 0.63 0.00 Avail Cap(c_a), veh/h 0 148 0 1207 0 1534 0 2223 1165 334 3047 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 20.9 0.0 16.9 0.0 16.5 3.5 27.7 9.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 6.5 0.0 0.2 0.0 2.8 0.2 8.6 0.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 6.5 0.0 1.4 0.0 6.2 0.9 2.0 3.5 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 27.4 0.0 17.1 0.0 19.3 3.7 36.3 9.4 0.0 LnGrp LOS C B B A D A
Approach Vol, veh/h 0 1234 2200 2128
Approach Delay, s/veh 0.0 25.0 16.3 12.6
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 10.0 30.1 22.9 0.0 40.1 22.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 27.0 21.0 5.0 37.0 30.0 Max Q Clear Time (g_c+I1), s 6.3 21.4 17.6 0.0 17.3 6.3 Green Ext Time (p_c), s 0.0 4.7 1.4 0.0 12.3 1.1
Intersection Summary
HCM 7th Control Delay, s/veh 16.8
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 321 531 155 306 672 399 159 1194 215 339 1773 331 Future Volume (veh/h) 321 531 155 306 672 399 159 1194 215 339 1773 331 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 341 565 165 326 715 424 169 1270 229 361 1886 352 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 345 1491 457 401 1574 482 239 1472 265 379 1935 601 Arrive On Green 0.10 0.29 0.29 0.11 0.30 0.30 0.07 0.33 0.33 0.11 0.37 0.37 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4418 797 3510 5187 1610 Grp Volume(v), veh/h 341 565 165 326 715 424 169 994 505 361 1886 352 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1757 1755 1729 1610 Q Serve(g_s), s 9.9 8.9 8.4 9.2 11.3 25.8 4.8 27.4 27.4 10.4 36.5 17.9 Cycle Q Clear(g_c), s 9.9 8.9 8.4 9.2 11.3 25.8 4.8 27.4 27.4 10.4 36.5 17.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.45 1.00 1.00
Lane Grp Cap(c), veh/h 345 1491 457 401 1574 482 239 1152 585 379 1935 601 V/C Ratio(X) 0.99 0.38 0.36 0.81 0.45 0.88 0.71 0.86 0.86 0.95 0.97 0.59 Avail Cap(c_a), veh/h 345 1491 457 517 1731 530 241 1154 586 379 1935 601 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 45.9 29.0 28.9 44.0 28.7 33.7 46.5 31.8 31.8 45.2 31.5 25.6 Incr Delay (d2), s/veh 45.5 0.2 0.5 7.5 0.2 14.7 9.0 6.9 12.6 33.9 14.9 1.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.3 3.5 3.1 4.3 4.5 11.3 2.3 11.5 12.6 6.1 16.2 6.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 91.4 29.2 29.3 51.6 28.9 48.4 55.5 38.7 44.3 79.1 46.3 27.1 LnGrp LOS F C C D C D E D D E D C
Approach Vol, veh/h 1071 1465 1668 2599
Approach Delay, s/veh 49.0 39.6 42.1 48.3
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 37.9 15.6 33.3 10.9 42.0 14.0 34.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 34.0 15.0 29.0 7.0 38.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 12.4 29.4 11.2 10.9 6.8 38.5 11.9 27.8 Green Ext Time (p_c), s 0.0 3.2 0.4 3.8 0.0 0.0 0.0 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 45.0
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 143 0 160 0 0 0 212 1156 0 0 1041 145 Future Volume (veh/h) 143 0 160 0 0 0 212 1156 0 0 1041 145 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 151 0 168 0 0 0 223 1217 0 0 1096 153 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 530 0 0 0 5 0 434 3256 0 0 2041 625
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.63 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 151 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 151 13.9 0 0 0 223 1217 0 0 1096 153 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.4 0.0 0.0 0.0 2.1 4.1 0.0 0.0 5.9 2.3 Cycle Q Clear(g_c), s 1.4 0.0 0.0 0.0 2.1 4.1 0.0 0.0 5.9 2.3 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 530 0 5 0 434 3256 0 0 2041 625
V/C Ratio(X) 0.28 0.00 0.00 0.00 0.51 0.37 0.00 0.00 0.54 0.24 Avail Cap(c_a), veh/h 2718 0 1524 0 485 4447 0 0 3156 967 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.6 0.0 0.0 0.0 14.8 3.3 0.0 0.0 8.4 7.4 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 0.9 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.7 0.0 0.0 0.0 1.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.9 0.0 0.0 0.0 15.8 3.3 0.0 0.0 8.7 7.6 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1440 1249
Approach Delay, s/veh 0.0 5.3 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 26.7 8.5 18.2 9.5 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.1 4.1 7.9 3.4 0.0
Green Ext Time (p_c), s 8.5 0.1 6.3 0.4 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.2
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 153 527 183 246 836 301 201 935 221 222 830 109 Future Volume (veh/h) 153 527 183 246 836 301 201 935 221 222 830 109 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 156 538 187 251 853 307 205 954 226 227 847 111 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 238 1502 456 281 1566 476 296 1477 452 464 1725 528 Arrive On Green 0.07 0.29 0.29 0.08 0.30 0.30 0.08 0.28 0.28 0.13 0.33 0.33 Sat Flow, veh/h 3510 5187 1576 3510 5187 1578 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 156 538 187 251 853 307 205 954 226 227 847 111 Grp Sat Flow(s),veh/h/ln 1755 1729 1576 1755 1729 1578 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 3.2 6.2 7.2 5.3 10.3 12.6 4.3 12.1 8.9 4.5 9.8 3.8 Cycle Q Clear(g_c), s 3.2 6.2 7.2 5.3 10.3 12.6 4.3 12.1 8.9 4.5 9.8 3.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 238 1502 456 281 1566 476 296 1477 452 464 1725 528 V/C Ratio(X) 0.66 0.36 0.41 0.89 0.54 0.64 0.69 0.65 0.50 0.49 0.49 0.21 Avail Cap(c_a), veh/h 281 2353 715 281 2353 716 421 2353 719 468 2422 741 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.1 21.1 21.5 34.2 21.9 22.7 33.4 23.5 22.4 30.2 20.0 18.0 Incr Delay (d2), s/veh 4.3 0.1 0.6 28.1 0.3 1.5 2.9 0.5 0.9 0.8 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 2.3 2.4 3.2 3.8 4.4 1.8 4.4 3.1 1.8 3.4 1.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.3 21.2 22.1 62.3 22.2 24.1 36.3 24.0 23.2 31.0 20.2 18.2 LnGrp LOS D C C E C C D C C C C B
Approach Vol, veh/h 881 1411 1385 1185
Approach Delay, s/veh 24.4 29.7 25.7 22.1
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.9 25.3 10.0 25.7 10.3 28.9 9.1 26.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 34.0 6.0 34.0 9.0 35.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 6.5 14.1 7.3 9.2 6.3 11.8 5.2 14.6 Green Ext Time (p_c), s 0.2 6.7 0.0 4.1 0.2 5.8 0.0 6.4 Intersection Summary
HCM 7th Control Delay, s/veh 25.7
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Year 2028 Cumulative + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 38 77 206 89 123 49 180 1313 90 30 1155 62 Future Volume (veh/h) 38 77 206 89 123 49 180 1313 90 30 1155 62 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 80 215 93 128 51 188 1368 94 31 1203 65 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 72 335 284 120 385 322 232 2304 700 60 1811 550 Arrive On Green 0.04 0.18 0.18 0.07 0.20 0.20 0.13 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 40 80 215 93 128 51 188 1368 94 31 1203 65 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.4 2.3 8.2 3.2 3.7 1.7 6.5 12.8 2.3 1.1 12.6 1.8 Cycle Q Clear(g_c), s 1.4 2.3 8.2 3.2 3.7 1.7 6.5 12.8 2.3 1.1 12.6 1.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 72 335 284 120 385 322 232 2304 700 60 1811 550 V/C Ratio(X) 0.56 0.24 0.76 0.78 0.33 0.16 0.81 0.59 0.13 0.52 0.66 0.12 Avail Cap(c_a), veh/h 169 1154 978 141 1124 939 254 2988 908 169 2746 834 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.3 22.7 25.1 29.5 21.9 21.1 27.2 13.5 10.6 30.5 17.7 14.2 Incr Delay (d2), s/veh 6.6 0.4 4.1 20.3 0.5 0.2 16.6 0.2 0.1 6.8 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.2 2.0 1.6 0.6 3.5 3.8 0.7 0.5 4.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.9 23.1 29.3 49.8 22.4 21.3 43.9 13.7 10.6 37.3 18.1 14.3 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 335 272 1650 1299
Approach Delay, s/veh 28.7 31.6 17.0 18.4
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 32.5 8.3 17.3 12.2 26.4 6.6 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.1 14.8 5.2 10.2 8.5 14.6 3.4 5.7 Green Ext Time (p_c), s 0.0 9.7 0.0 1.2 0.0 7.8 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.7
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 5.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 12 175 74 12 175 118
Future Vol, veh/h 12 175 74 12 175 118
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 12 179 76 12 179 120
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 499 44 0 0 88 0
Stage 1 82 - - - - -
Stage 2 417 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 501 1017 - - 1506 -
Stage 1 932 - - - - -
Stage 2 633 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 441 1017 - - 1506 -
Mov Cap-2 Maneuver 441 - - - - -
Stage 1 932 - - - - -
Stage 2 558 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 9.81 0 4.61

HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 938 1506 -
HCM Lane V/C Ratio - - 0.203 0.119 -
HCM Ctrl Dly (s/v) - - 9.8 7.7 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.8 0.4 -
* *1 h *
HCM 7th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1471 48 0 1646 0 47
Future Vol, veh/h 1471 48 0 1646 0 47
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1501 49 0 1680 0 48
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 751
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 303
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 303
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 19.08

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 303 - - -
HCM Lane V/C Ratio 0.158 - - -
HCM Ctrl Dly (s/v) 19.1 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.6 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1477 48 0 1652 0 48
Future Vol, veh/h 1477 48 0 1652 0 48
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1507 49 0 1686 0 49
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 754
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 302
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 302
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 19.21

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 302 - - -
HCM Lane V/C Ratio 0.162 - - -
HCM Ctrl Dly (s/v) 19.2 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.6 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1398 36 0 1634 0 58
Future Vol, veh/h 1398 36 0 1634 0 58
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1441 37 0 1685 0 60
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 721
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 317
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 317
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.96

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 317 - - -
HCM Lane V/C Ratio 0.188 - - -
HCM Ctrl Dly (s/v) 19 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.7 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 35 0 2109 1865 60
Future Vol, veh/h 0 35 0 2109 1865 60
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 36 0 2174 1923 62
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 961 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 220 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 220 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 24.54 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 220 - -
HCM Lane V/C Ratio - 0.164 - -
HCM Ctrl Dly (s/v) - 24.5 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.6 - -
I* 7
HCM 7th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 12/28/2025
Year 2028 Cumulative + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 35 0 2416 1898 0
Future Vol, veh/h 0 35 0 2416 1898 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 36 0 2465 1937 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 968 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 218 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 218 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 24.75 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 218 - -
HCM Lane V/C Ratio - 0.164 - -
HCM Ctrl Dly (s/v) - 24.7 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.6 - -
f ** **t
Appendix G. Buildout Year 2046
Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 1141 29 2 810 40 5 4 0 34 13 31 Future Volume (veh/h) 34 1141 29 2 810 40 5 4 0 34 13 31 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 37 1240 32 2 880 43 5 4 0 37 14 34 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 79 2123 55 6 1859 91 322 208 0 261 112 142
Arrive On Green 0.04 0.41 0.41 0.00 0.37 0.37 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5199 134 1810 5060 247 685 957 0 463 516 653 Grp Volume(v), veh/h 37 825 447 2 601 322 9 0 0 85 0 0
Grp Sat Flow(s),veh/h/ln 1810 1729 1875 1810 1729 1848 1641 0 0 1632 0 0 Q Serve(g_s), s 0.6 6.0 6.0 0.0 4.3 4.3 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.6 6.0 6.0 0.0 4.3 4.3 0.1 0.0 0.0 1.3 0.0 0.0 Prop In Lane 1.00 0.07 1.00 0.13 0.56 0.00 0.44 0.40
Lane Grp Cap(c), veh/h 79 1412 766 6 1270 679 530 0 0 514 0 0 V/C Ratio(X) 0.47 0.58 0.58 0.36 0.47 0.47 0.02 0.00 0.00 0.17 0.00 0.00 Avail Cap(c_a), veh/h 280 1929 1046 280 1929 1031 1406 0 0 1388 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 15.1 7.4 7.4 16.1 7.8 7.8 9.9 0.0 0.0 10.4 0.0 0.0 Incr Delay (d2), s/veh 4.2 0.4 0.7 34.4 0.3 0.5 0.0 0.0 0.0 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.9 1.0 0.1 0.7 0.8 0.0 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.3 7.8 8.1 50.4 8.1 8.3 10.0 0.0 0.0 10.5 0.0 0.0 LnGrp LOS B A A D A A A B
Approach Vol, veh/h 1309 925 9 85
Approach Delay, s/veh 8.2 8.3 10.0 10.5
Approach LOS A A A B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 17.2 11.0 5.4 15.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.1 2.0 8.0 3.3 2.6 6.3
Green Ext Time (p_c), s 0.0 0.0 5.2 0.4 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 8.3
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 251 705 417 154 636 161 310 1523 283 198 1384 169 Future Volume (veh/h) 251 705 417 154 636 161 310 1523 283 198 1384 169 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 256 719 426 157 649 164 316 1554 289 202 1412 172 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 277 1577 483 208 1475 563 312 1802 654 243 1699 654 Arrive On Green 0.08 0.32 0.32 0.06 0.30 0.30 0.09 0.37 0.37 0.07 0.35 0.35 Sat Flow, veh/h 3291 4863 1491 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 256 719 426 157 649 164 316 1554 289 202 1412 172 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 7.3 11.1 25.7 4.5 10.2 7.3 9.0 28.1 12.8 5.8 25.3 6.9 Cycle Q Clear(g_c), s 7.3 11.1 25.7 4.5 10.2 7.3 9.0 28.1 12.8 5.8 25.3 6.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 277 1577 483 208 1475 563 312 1802 654 243 1699 654 V/C Ratio(X) 0.92 0.46 0.88 0.76 0.44 0.29 1.01 0.86 0.44 0.83 0.83 0.26 Avail Cap(c_a), veh/h 277 1740 533 208 1638 613 312 1894 683 243 1792 683 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.2 25.5 30.4 43.8 26.6 20.7 43.0 27.7 18.8 43.4 28.3 17.2 Incr Delay (d2), s/veh 34.5 0.2 14.8 14.6 0.2 0.3 54.4 4.2 0.5 21.3 3.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.2 4.0 10.4 2.1 3.7 2.4 5.8 10.3 4.1 2.9 9.3 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 77.7 25.7 45.2 58.3 26.8 21.0 97.4 31.9 19.3 64.7 31.7 17.4 LnGrp LOS E C D E C C F C B E C B
Approach Vol, veh/h 1401 970 2159 1786
Approach Delay, s/veh 41.1 30.9 39.8 34.0
Approach LOS D C D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.0 39.2 10.0 34.8 13.0 37.2 12.0 32.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 37.0 6.0 34.0 9.0 35.0 8.0 32.0 Max Q Clear Time (g_c+I1), s 7.8 30.1 6.5 27.7 11.0 27.3 9.3 12.2 Green Ext Time (p_c), s 0.0 5.1 0.0 3.1 0.0 5.1 0.0 4.4 Intersection Summary
HCM 7th Control Delay, s/veh 37.1
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 69 1263 807 63 88 51
Future Volume (veh/h) 69 1263 807 63 88 51
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 75 1373 877 68 96 55
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 271 2958 1874 581 583 267
Arrive On Green 0.08 0.57 0.36 0.36 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 75 1373 877 68 96 55
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 0.6 4.7 3.9 0.9 0.7 0.9
Cycle Q Clear(g_c), s 0.6 4.7 3.9 0.9 0.7 0.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 271 2958 1874 581 583 267
V/C Ratio(X) 0.28 0.46 0.47 0.12 0.16 0.21
Avail Cap(c_a), veh/h 578 5128 3590 1113 3702 1698
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 13.2 3.8 7.4 6.5 10.8 10.9
Incr Delay (d2), s/veh 0.5 0.1 0.2 0.1 0.1 0.4
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.0 0.6 0.0 0.2 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.8 3.9 7.6 6.6 11.0 11.3
LnGrp LOS B A A A B B
Approach Vol, veh/h 1448 945 151
Approach Delay, s/veh 4.4 7.6 11.1
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 21.3 9.0 6.3 15.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 32.0 5.0 21.0
Max Q Clear Time (g_c+I1), s 6.7 2.9 2.6 5.9
Green Ext Time (p_c), s 9.6 0.5 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 6.0
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 119 1053 17 20 705 86 14 34 70 216 37 113 Future Volume (veh/h) 119 1053 17 20 705 86 14 34 70 216 37 113 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 129 1145 18 22 766 93 15 37 76 235 40 123 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 306 1919 596 48 1605 498 66 543 241 384 869 381 Arrive On Green 0.09 0.37 0.37 0.03 0.31 0.31 0.02 0.15 0.15 0.11 0.24 0.24 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1601 3510 3610 1582 Grp Volume(v), veh/h 129 1145 18 22 766 93 15 37 76 235 40 123 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1601 1755 1805 1582 Q Serve(g_s), s 1.6 8.3 0.3 0.6 5.6 2.0 0.2 0.4 2.0 3.0 0.4 3.0 Cycle Q Clear(g_c), s 1.6 8.3 0.3 0.6 5.6 2.0 0.2 0.4 2.0 3.0 0.4 3.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 306 1919 596 48 1605 498 66 543 241 384 869 381 V/C Ratio(X) 0.42 0.60 0.03 0.46 0.48 0.19 0.23 0.07 0.32 0.61 0.05 0.32 Avail Cap(c_a), veh/h 528 3119 968 194 2896 899 377 2326 1031 829 2791 1223 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 20.1 11.9 9.3 22.3 13.0 11.8 22.5 17.0 17.6 19.8 13.6 14.6 Incr Delay (d2), s/veh 0.9 0.3 0.0 6.6 0.2 0.2 1.7 0.1 0.7 1.6 0.0 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.2 0.1 0.3 1.6 0.5 0.1 0.1 0.6 1.1 0.1 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.1 12.2 9.4 29.0 13.2 12.0 24.2 17.0 18.4 21.4 13.6 15.0 LnGrp LOS C B A C B B C B B C B B
Approach Vol, veh/h 1292 881 128 398
Approach Delay, s/veh 13.0 13.5 18.7 18.6
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.1 11.0 5.2 21.2 4.9 15.2 8.1 18.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.0 4.0 2.6 10.3 2.2 5.0 3.6 7.6 Green Ext Time (p_c), s 0.4 0.4 0.0 6.9 0.0 0.6 0.1 4.8 Intersection Summary
HCM 7th Control Delay, s/veh 14.3
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 119 473 181 339 730 100 272 704 220 84 1002 240 Future Volume (veh/h) 119 473 181 339 730 100 272 704 220 84 1002 240 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 129 514 197 368 793 109 296 765 239 91 1089 261 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 202 997 309 344 1208 374 301 2107 654 185 1347 593 Arrive On Green 0.06 0.20 0.20 0.10 0.25 0.25 0.09 0.43 0.43 0.06 0.39 0.39 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 129 514 197 368 793 109 296 765 239 91 1089 261 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 2.9 7.2 9.2 8.0 11.2 4.5 6.9 8.1 8.2 2.1 21.9 9.8 Cycle Q Clear(g_c), s 2.9 7.2 9.2 8.0 11.2 4.5 6.9 8.1 8.2 2.1 21.9 9.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 202 997 309 344 1208 374 301 2107 654 185 1347 593 V/C Ratio(X) 0.64 0.52 0.64 1.07 0.66 0.29 0.98 0.36 0.37 0.49 0.81 0.44 Avail Cap(c_a), veh/h 301 2035 630 344 2099 650 301 2417 750 258 1638 721 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.4 27.3 28.1 34.5 26.1 23.6 35.0 14.9 14.9 35.3 20.8 17.1 Incr Delay (d2), s/veh 3.4 0.4 2.2 67.9 0.6 0.4 46.8 0.1 0.3 2.0 2.6 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 2.6 3.2 6.2 4.0 1.5 4.5 2.6 2.4 0.8 7.8 3.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.7 27.7 30.3 102.4 26.7 24.0 81.8 15.0 15.2 37.4 23.4 17.6 LnGrp LOS D C C F C C F B B D C B
Approach Vol, veh/h 840 1270 1300 1441
Approach Delay, s/veh 30.0 48.4 30.2 23.2
Approach LOS C D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.3 37.1 12.0 19.7 11.0 34.4 8.7 23.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 38.0 8.0 32.0 7.0 37.0 7.0 33.0 Max Q Clear Time (g_c+I1), s 4.1 10.1 10.0 11.2 8.9 23.9 4.9 13.2 Green Ext Time (p_c), s 0.0 3.7 0.0 3.7 0.0 6.4 0.1 5.2 Intersection Summary
HCM 7th Control Delay, s/veh 32.9
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 81 687 20 20 518 92 52 29 34 340 78 100 Future Volume (veh/h) 81 687 20 20 518 92 52 29 34 340 78 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 88 747 22 22 563 100 57 32 37 370 85 109 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 126 1401 432 47 819 362 98 287 242 437 643 543 Arrive On Green 0.07 0.27 0.27 0.03 0.23 0.23 0.05 0.15 0.15 0.24 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1601 1810 1900 1606 Grp Volume(v), veh/h 88 747 22 22 563 100 57 32 37 370 85 109 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1601 1810 1900 1606 Q Serve(g_s), s 2.4 6.3 0.5 0.6 7.3 2.7 1.6 0.7 1.0 10.0 1.6 2.5 Cycle Q Clear(g_c), s 2.4 6.3 0.5 0.6 7.3 2.7 1.6 0.7 1.0 10.0 1.6 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 126 1401 432 47 819 362 98 287 242 437 643 543 V/C Ratio(X) 0.70 0.53 0.05 0.46 0.69 0.28 0.58 0.11 0.15 0.85 0.13 0.20 Avail Cap(c_a), veh/h 176 1815 559 176 1263 558 211 923 778 563 1293 1093 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.4 16.0 13.9 24.7 18.2 16.4 23.8 18.9 19.0 18.6 11.8 12.1 Incr Delay (d2), s/veh 6.9 0.3 0.0 6.9 1.0 0.4 5.4 0.2 0.3 9.3 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 2.0 0.2 0.3 2.5 0.8 0.8 0.3 0.3 4.7 0.6 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.3 16.3 13.9 31.6 19.3 16.8 29.1 19.0 19.3 27.9 11.9 12.3 LnGrp LOS C B B C B B C B B C B B
Approach Vol, veh/h 857 685 126 564
Approach Delay, s/veh 17.7 19.3 23.7 22.4
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.4 11.8 5.3 17.9 6.8 21.4 7.6 15.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 12.0 3.0 2.6 8.3 3.6 4.5 4.4 9.3 Green Ext Time (p_c), s 0.5 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.7
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 36 671 338 74 479 14 206 30 141 33 64 25 Future Volume (veh/h) 36 671 338 74 479 14 206 30 141 33 64 25 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 39 729 367 80 521 15 224 33 153 36 70 27 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 77 1008 435 124 1103 487 282 521 440 72 300 250 Arrive On Green 0.04 0.28 0.28 0.07 0.31 0.31 0.16 0.27 0.27 0.04 0.16 0.16 Sat Flow, veh/h 1810 3610 1557 1810 3610 1594 1810 1900 1607 1810 1900 1583 Grp Volume(v), veh/h 39 729 367 80 521 15 224 33 153 36 70 27 Grp Sat Flow(s),veh/h/ln 1810 1805 1557 1810 1805 1594 1810 1900 1607 1810 1900 1583 Q Serve(g_s), s 1.0 8.6 10.5 2.0 5.5 0.3 5.6 0.6 3.6 0.9 1.5 0.7 Cycle Q Clear(g_c), s 1.0 8.6 10.5 2.0 5.5 0.3 5.6 0.6 3.6 0.9 1.5 0.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 77 1008 435 124 1103 487 282 521 440 72 300 250 V/C Ratio(X) 0.51 0.72 0.84 0.64 0.47 0.03 0.79 0.06 0.35 0.50 0.23 0.11 Avail Cap(c_a), veh/h 191 1450 625 191 1450 640 382 1205 1019 191 1004 836 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.2 15.4 16.1 21.5 13.3 11.5 19.2 12.7 13.8 22.3 17.4 17.1 Incr Delay (d2), s/veh 5.1 1.0 7.2 5.4 0.3 0.0 7.9 0.1 0.5 5.3 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 2.7 3.6 0.9 1.7 0.1 2.6 0.2 1.0 0.4 0.6 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.3 16.4 23.3 26.9 13.6 11.5 27.2 12.7 14.2 27.5 17.8 17.2 LnGrp LOS C B C C B B C B B C B B
Approach Vol, veh/h 1135 616 410 133
Approach Delay, s/veh 19.0 15.3 21.2 20.3
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 5.9 17.0 7.3 17.2 11.4 11.5 6.0 18.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 30.0 5.0 19.0 10.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 2.9 5.6 4.0 10.6 7.6 3.5 3.0 7.5 Green Ext Time (p_c), s 0.0 0.6 0.0 2.1 0.1 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 18.5
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 289 0 620 599 580 605 306 1214 3 3 1569 188 Future Volume (veh/h) 289 0 620 599 580 605 306 1214 3 3 1569 188 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 314 0 674 716 539 658 333 1320 3 3 1705 204 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 534 0 474 968 508 861 324 2149 5 7 1627 505
Arrive On Green 0.15 0.00 0.15 0.28 0.28 0.28 0.10 0.42 0.42 0.00 0.32 0.32 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5177 12 1753 5025 1558 Grp Volume(v), veh/h 314 0 674 716 539 658 333 854 469 3 1705 204 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1558 Q Serve(g_s), s 8.8 0.0 16.0 19.5 29.0 20.3 10.0 21.0 21.0 0.2 34.0 10.7 Cycle Q Clear(g_c), s 8.8 0.0 16.0 19.5 29.0 20.3 10.0 21.0 21.0 0.2 34.0 10.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 534 0 474 968 508 861 324 1390 763 7 1627 505 V/C Ratio(X) 0.59 0.00 1.42 0.74 1.06 0.76 1.03 0.61 0.61 0.43 1.05 0.40 Avail Cap(c_a), veh/h 534 0 474 968 508 861 324 1390 763 83 1627 505 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.4 0.0 44.5 34.6 38.0 34.9 47.5 24.1 24.1 52.2 35.5 27.6 Incr Delay (d2), s/veh 1.7 0.0 201.3 3.0 56.8 4.1 57.4 0.8 1.5 36.6 36.0 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.7 0.0 19.1 8.2 20.2 7.7 6.6 7.6 8.5 0.1 18.0 3.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 43.1 0.0 245.8 37.6 94.8 39.0 104.9 24.9 25.6 88.7 71.5 28.1 LnGrp LOS D F D F D F C C F F C
Approach Vol, veh/h 988 1913 1656 1912
Approach Delay, s/veh 181.4 54.2 41.2 66.9
Approach LOS F D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.4 47.6 20.0 14.0 38.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 39.0 16.0 10.0 34.0 29.0 Max Q Clear Time (g_c+I1), s 2.2 23.0 18.0 12.0 36.0 31.0 Green Ext Time (p_c), s 0.0 7.0 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 74.0
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 862 34 46 619 76 126
Future Volume (veh/h) 862 34 46 619 76 126
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 937 37 50 673 83 137
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1468 58 100 2118 113 187
Arrive On Green 0.41 0.41 0.06 0.59 0.18 0.18
Sat Flow, veh/h 3634 140 1810 3705 631 1042
Grp Volume(v), veh/h 478 496 50 673 221 0
Grp Sat Flow(s),veh/h/ln 1805 1874 1810 1805 1681 0
Q Serve(g_s), s 7.2 7.2 0.9 3.2 4.3 0.0
Cycle Q Clear(g_c), s 7.2 7.2 0.9 3.2 4.3 0.0
Prop In Lane 0.07 1.00 0.38 0.62
Lane Grp Cap(c), veh/h 748 777 100 2118 302 0
V/C Ratio(X) 0.64 0.64 0.50 0.32 0.73 0.00
Avail Cap(c_a), veh/h 1318 1369 317 3691 835 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 8.0 8.0 15.7 3.6 13.3 0.0
Incr Delay (d2), s/veh 0.9 0.9 3.8 0.1 3.4 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 1.4 0.4 0.1 1.5 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.9 8.9 19.5 3.7 16.7 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 974 723 221
Approach Delay, s/veh 8.9 4.8 16.7
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 10.1 5.9 18.2 24.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 6.0 25.0 35.0
Max Q Clear Time (g_c+I1), s 6.3 2.9 9.2 5.2
Green Ext Time (p_c), s 0.5 0.0 5.0 4.3
Intersection Summary
HCM 7th Control Delay, s/veh 8.2
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 182 381 336 153 346 249 254 959 150 264 1264 150 Future Volume (veh/h) 182 381 336 153 346 249 254 959 150 264 1264 150 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 198 414 365 166 376 271 276 1042 163 287 1374 163 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 290 914 705 250 873 388 370 1747 534 388 1775 550 Arrive On Green 0.08 0.25 0.25 0.07 0.24 0.24 0.11 0.34 0.34 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2784 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 198 414 365 166 376 271 276 1042 163 287 1374 163 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.8 6.8 7.9 3.2 6.2 10.8 5.4 11.7 5.3 5.6 16.6 5.2 Cycle Q Clear(g_c), s 3.8 6.8 7.9 3.2 6.2 10.8 5.4 11.7 5.3 5.6 16.6 5.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 290 914 705 250 873 388 370 1747 534 388 1775 550 V/C Ratio(X) 0.68 0.45 0.52 0.66 0.43 0.70 0.75 0.60 0.30 0.74 0.77 0.30 Avail Cap(c_a), veh/h 350 1750 1349 250 1647 731 400 1849 566 500 1996 619 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.3 22.1 22.5 31.8 22.5 24.3 30.5 19.3 17.2 30.2 20.7 16.9 Incr Delay (d2), s/veh 4.1 0.4 0.6 6.4 0.3 2.3 6.9 0.5 0.3 4.2 1.7 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 2.6 2.3 1.5 2.3 3.8 2.4 4.0 1.7 2.3 5.9 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.4 22.4 23.1 38.2 22.8 26.5 37.4 19.8 17.5 34.4 22.4 17.2 LnGrp LOS D C C D C C D B B C C B
Approach Vol, veh/h 977 813 1481 1824
Approach Delay, s/veh 25.3 27.2 22.8 23.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.8 27.6 9.0 21.8 11.4 28.0 9.8 21.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 25.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.6 13.7 5.2 9.9 7.4 18.6 5.8 12.8 Green Ext Time (p_c), s 0.2 5.3 0.0 3.9 0.1 5.4 0.1 2.9 Intersection Summary
HCM 7th Control Delay, s/veh 24.4
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 789 159 92 537 6 157 6 160 22 15 10 Future Volume (veh/h) 6 789 159 92 537 6 157 6 160 22 15 10 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 7 858 173 100 584 7 171 7 174 24 16 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 17 1217 526 129 1459 17 272 11 251 141 94 65 Arrive On Green 0.01 0.34 0.34 0.07 0.40 0.40 0.16 0.16 0.16 0.17 0.17 0.17 Sat Flow, veh/h 1810 3610 1559 1810 3652 44 1742 71 1607 841 561 386 Grp Volume(v), veh/h 7 858 173 100 289 302 178 0 174 51 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1891 1813 0 1607 1788 0 0 Q Serve(g_s), s 0.2 12.3 4.9 3.2 6.8 6.8 5.5 0.0 6.1 1.5 0.0 0.0 Cycle Q Clear(g_c), s 0.2 12.3 4.9 3.2 6.8 6.8 5.5 0.0 6.1 1.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.02 0.96 1.00 0.47 0.22
Lane Grp Cap(c), veh/h 17 1217 526 129 721 755 283 0 251 299 0 0 V/C Ratio(X) 0.42 0.70 0.33 0.77 0.40 0.40 0.63 0.00 0.69 0.17 0.00 0.00 Avail Cap(c_a), veh/h 151 1692 730 212 906 949 577 0 511 299 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 29.4 17.2 14.8 27.3 12.8 12.8 23.6 0.0 23.9 21.3 0.0 0.0 Incr Delay (d2), s/veh 16.1 0.8 0.4 9.4 0.4 0.3 2.3 0.0 3.4 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 4.2 1.5 1.6 2.2 2.3 2.3 0.0 2.2 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 45.5 18.0 15.1 36.6 13.2 13.2 25.9 0.0 27.3 21.6 0.0 0.0 LnGrp LOS D B B D B B C C C
Approach Vol, veh/h 1038 691 352 51
Approach Delay, s/veh 17.7 16.6 26.6 21.6
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 13.3 8.3 24.1 14.0 4.5 27.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 7.0 28.0 10.0 5.0 30.0 Max Q Clear Time (g_c+I1), s 8.1 5.2 14.3 3.5 2.2 8.8
Green Ext Time (p_c), s 1.1 0.0 5.0 0.1 0.0 3.0
Intersection Summary
HCM 7th Control Delay, s/veh 18.9
HCM 7th LOS B
Notes
User approved pedestrian interval to be less than phase max green. h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 473 214 312 275 55 141 95 267 83 181 16 Future Volume (veh/h) 67 473 214 312 275 55 141 95 267 83 181 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 73 514 233 339 299 60 153 103 290 90 197 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 95 715 319 436 975 435 233 766 597 136 704 61 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1480 1810 1709 147 Grp Volume(v), veh/h 73 514 233 339 299 60 153 103 290 90 0 214 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1480 1810 0 1856 Q Serve(g_s), s 3.2 10.7 10.9 7.5 5.3 2.3 3.4 2.8 11.7 3.9 0.0 6.2 Cycle Q Clear(g_c), s 3.2 10.7 10.9 7.5 5.3 2.3 3.4 2.8 11.7 3.9 0.0 6.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 95 715 319 436 975 435 233 766 597 136 0 765 V/C Ratio(X) 0.77 0.72 0.73 0.78 0.31 0.14 0.66 0.13 0.49 0.66 0.00 0.28 Avail Cap(c_a), veh/h 202 1122 501 524 1257 561 349 827 644 157 0 785 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.6 30.1 30.2 34.1 23.4 22.3 36.6 15.1 17.8 36.2 0.0 15.7 Incr Delay (d2), s/veh 12.3 1.4 3.2 6.1 0.2 0.1 3.1 0.1 0.6 8.0 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 4.4 4.1 3.3 2.1 0.8 1.5 1.1 3.5 1.9 0.0 2.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 49.9 31.5 33.4 40.2 23.5 22.4 39.8 15.2 18.4 44.2 0.0 15.9 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 820 698 546 304
Approach Delay, s/veh 33.7 31.5 23.8 24.3
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.1 36.4 14.0 19.9 9.3 37.2 8.2 25.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 35.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 5.9 13.7 9.5 12.9 5.4 8.2 5.2 7.3 Green Ext Time (p_c), s 0.0 1.5 0.3 3.0 0.1 1.1 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 29.6
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 60 663 27 44 288 80 45 53 143 252 40 89 Future Volume (veh/h) 60 663 27 44 288 80 45 53 143 252 40 89 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 65 721 29 48 313 87 49 58 155 274 43 97 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 1095 486 124 1040 461 243 319 269 484 449 374 Arrive On Green 0.08 0.30 0.30 0.07 0.29 0.29 0.07 0.17 0.17 0.14 0.24 0.24 Sat Flow, veh/h 1810 3610 1602 1810 3610 1602 3510 1900 1602 3510 1900 1583 Grp Volume(v), veh/h 65 721 29 48 313 87 49 58 155 274 43 97 Grp Sat Flow(s),veh/h/ln 1810 1805 1602 1810 1805 1602 1755 1900 1602 1755 1900 1583 Q Serve(g_s), s 1.7 8.6 0.6 1.3 3.4 2.0 0.7 1.3 4.4 3.6 0.9 2.5 Cycle Q Clear(g_c), s 1.7 8.6 0.6 1.3 3.4 2.0 0.7 1.3 4.4 3.6 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 1095 486 124 1040 461 243 319 269 484 449 374 V/C Ratio(X) 0.43 0.66 0.06 0.39 0.30 0.19 0.20 0.18 0.58 0.57 0.10 0.26 Avail Cap(c_a), veh/h 292 1893 840 256 1820 808 496 1341 1131 779 1495 1246 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.6 15.0 12.3 22.1 13.8 13.3 21.8 17.7 19.0 20.0 14.8 15.4 Incr Delay (d2), s/veh 1.9 0.7 0.1 2.0 0.2 0.2 0.4 0.3 2.0 1.0 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 2.7 0.2 0.5 1.0 0.6 0.2 0.5 1.5 1.3 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 23.5 15.7 12.3 24.1 13.9 13.5 22.2 18.0 21.0 21.0 14.9 15.8 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 815 448 262 414
Approach Delay, s/veh 16.2 14.9 20.5 19.1
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.8 12.3 7.4 19.0 7.4 15.7 8.1 18.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 35.0 7.0 26.0 7.0 39.0 8.0 25.0 Max Q Clear Time (g_c+I1), s 5.6 6.4 3.3 10.6 2.7 4.5 3.7 5.4 Green Ext Time (p_c), s 0.4 0.7 0.0 3.9 0.0 0.5 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 17.1
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 25 377 402 156 186 110 212 897 207 174 1187 29 Future Volume (veh/h) 25 377 402 156 186 110 212 897 207 174 1187 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 27 410 437 170 202 120 230 975 225 189 1290 32 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 1145 510 250 1868 572 318 1810 554 220 1663 509 Arrive On Green 0.03 0.32 0.32 0.07 0.36 0.36 0.09 0.35 0.35 0.06 0.32 0.32 Sat Flow, veh/h 3510 3610 1609 3510 5187 1588 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 27 410 437 170 202 120 230 975 225 189 1290 32 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1588 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.6 7.0 20.4 3.8 2.1 4.2 5.1 12.0 8.6 4.3 18.0 1.1 Cycle Q Clear(g_c), s 0.6 7.0 20.4 3.8 2.1 4.2 5.1 12.0 8.6 4.3 18.0 1.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 99 1145 510 250 1868 572 318 1810 554 220 1663 509 V/C Ratio(X) 0.27 0.36 0.86 0.68 0.11 0.21 0.72 0.54 0.41 0.86 0.78 0.06 Avail Cap(c_a), veh/h 220 1445 644 307 2206 675 439 2271 696 220 1947 596 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.0 21.0 25.6 36.2 17.0 17.7 35.4 20.9 19.7 37.1 24.5 18.8 Incr Delay (d2), s/veh 1.5 0.2 9.2 4.4 0.0 0.2 3.6 0.3 0.5 27.5 1.7 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.7 8.1 1.7 0.7 1.4 2.2 4.3 2.9 2.5 6.7 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.5 21.2 34.8 40.6 17.0 17.9 39.0 21.1 20.2 64.6 26.3 18.9 LnGrp LOS D C C D B B D C C E C B
Approach Vol, veh/h 874 492 1430 1511
Approach Delay, s/veh 28.6 25.4 23.8 30.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 31.9 9.7 29.3 11.3 29.6 6.3 32.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 6.3 14.0 5.8 22.4 7.1 20.0 2.6 6.2 Green Ext Time (p_c), s 0.0 7.0 0.1 2.8 0.2 5.6 0.0 1.5 Intersection Summary
HCM 7th Control Delay, s/veh 27.5
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 1031 275 280 557 36 185 518 213 37 640 42 Future Volume (veh/h) 42 1031 275 280 557 36 185 518 213 37 640 42 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 46 1121 299 304 605 39 201 563 232 40 696 46 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 145 1300 579 381 1471 95 286 997 442 133 1208 371 Arrive On Green 0.04 0.36 0.36 0.11 0.43 0.43 0.08 0.28 0.28 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1607 3510 3443 222 3510 3610 1598 3510 5187 1596 Grp Volume(v), veh/h 46 1121 299 304 317 327 201 563 232 40 696 46 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1860 1755 1805 1598 1755 1729 1596 Q Serve(g_s), s 0.9 21.2 10.8 6.2 9.0 9.0 4.1 9.9 9.1 0.8 8.8 1.7 Cycle Q Clear(g_c), s 0.9 21.2 10.8 6.2 9.0 9.0 4.1 9.9 9.1 0.8 8.8 1.7 Prop In Lane 1.00 1.00 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 145 1300 579 381 771 794 286 997 442 133 1208 371 V/C Ratio(X) 0.32 0.86 0.52 0.80 0.41 0.41 0.70 0.56 0.53 0.30 0.58 0.12 Avail Cap(c_a), veh/h 238 1372 611 381 771 794 286 1617 716 238 2253 693 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.3 21.9 18.5 32.0 14.7 14.7 33.0 22.9 22.6 34.5 25.0 22.3 Incr Delay (d2), s/veh 1.2 5.7 0.7 11.3 0.4 0.3 7.5 0.5 1.0 1.2 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 9.0 3.7 3.1 3.3 3.4 1.9 3.7 3.2 0.3 3.2 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.5 27.6 19.3 43.3 15.0 15.0 40.5 23.4 23.5 35.7 25.5 22.5 LnGrp LOS D C B D B B D C C D C C
Approach Vol, veh/h 1466 948 996 782
Approach Delay, s/veh 26.1 24.1 26.9 25.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 24.4 12.0 30.5 10.0 21.2 7.0 35.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 6.0 32.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 2.8 11.9 8.2 23.2 6.1 10.8 2.9 11.0 Green Ext Time (p_c), s 0.0 3.9 0.0 3.2 0.0 4.2 0.0 3.6 Intersection Summary
HCM 7th Control Delay, s/veh 25.8
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 174 1042 180 176 665 52 230 685 157 209 814 211 Future Volume (veh/h) 174 1042 180 176 665 52 230 685 157 209 814 211 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 189 1133 196 191 723 57 250 745 171 227 885 229 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 274 1767 541 276 1770 535 340 1405 436 323 1380 428 Arrive On Green 0.08 0.34 0.34 0.08 0.34 0.34 0.10 0.27 0.27 0.09 0.27 0.27 Sat Flow, veh/h 3510 5187 1587 3510 5187 1567 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 189 1133 196 191 723 57 250 745 171 227 885 229 Grp Sat Flow(s),veh/h/ln 1755 1729 1587 1755 1729 1567 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 3.9 13.5 6.8 3.9 7.8 1.8 5.1 9.0 6.4 4.6 11.1 9.0 Cycle Q Clear(g_c), s 3.9 13.5 6.8 3.9 7.8 1.8 5.1 9.0 6.4 4.6 11.1 9.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 274 1767 541 276 1770 535 340 1405 436 323 1380 428 V/C Ratio(X) 0.69 0.64 0.36 0.69 0.41 0.11 0.73 0.53 0.39 0.70 0.64 0.54 Avail Cap(c_a), veh/h 287 2188 670 287 2188 661 382 2259 700 478 2400 744 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.0 20.4 18.2 33.0 18.5 16.5 32.3 22.8 21.9 32.4 23.9 23.1 Incr Delay (d2), s/veh 6.5 0.4 0.4 6.6 0.2 0.1 6.4 0.3 0.6 2.8 0.5 1.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 4.9 2.2 1.8 2.7 0.6 2.2 3.2 2.2 1.9 4.0 3.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.5 20.9 18.6 39.6 18.7 16.6 38.6 23.1 22.4 35.2 24.4 24.1 LnGrp LOS D C B D B B D C C D C C
Approach Vol, veh/h 1518 971 1166 1341
Approach Delay, s/veh 22.9 22.7 26.3 26.2
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.8 23.9 9.8 29.0 11.1 23.5 9.7 29.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 6.0 31.0 8.0 34.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 6.6 11.0 5.9 15.5 7.1 13.1 5.9 9.8 Green Ext Time (p_c), s 0.2 5.0 0.0 7.1 0.1 6.1 0.0 4.6 Intersection Summary
HCM 7th Control Delay, s/veh 24.5
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/21/2025 Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 86 303 176 103 61 194 1002 229 45 1065 18 Future Volume (veh/h) 43 86 303 176 103 61 194 1002 229 45 1065 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 45 91 319 185 108 64 204 1055 241 47 1121 19 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 76 469 389 215 615 511 242 1490 340 79 1364 422 Arrive On Green 0.04 0.25 0.25 0.12 0.32 0.32 0.13 0.35 0.35 0.04 0.26 0.26 Sat Flow, veh/h 1810 1900 1576 1810 1900 1580 1810 4219 963 1810 5187 1604 Grp Volume(v), veh/h 45 91 319 185 108 64 204 865 431 47 1121 19 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1580 1810 1729 1723 1810 1729 1604 Q Serve(g_s), s 1.6 2.6 12.9 6.8 2.7 1.9 7.4 14.5 14.5 1.7 13.7 0.6 Cycle Q Clear(g_c), s 1.6 2.6 12.9 6.8 2.7 1.9 7.4 14.5 14.5 1.7 13.7 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.56 1.00 1.00
Lane Grp Cap(c), veh/h 76 469 389 215 615 511 242 1221 609 79 1364 422 V/C Ratio(X) 0.59 0.19 0.82 0.86 0.18 0.13 0.84 0.71 0.71 0.60 0.82 0.05 Avail Cap(c_a), veh/h 134 649 538 215 734 610 242 1221 609 134 1463 453 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.7 20.0 23.9 29.1 16.3 16.1 28.5 18.8 18.8 31.6 23.3 18.5 Incr Delay (d2), s/veh 7.0 0.2 7.0 28.0 0.1 0.1 22.9 1.9 3.8 7.1 3.7 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.0 5.0 4.3 1.1 0.6 4.3 5.0 5.3 0.8 5.1 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.7 20.2 30.9 57.1 16.5 16.2 51.4 20.7 22.6 38.7 27.0 18.6 LnGrp LOS D C C E B B D C C D C B
Approach Vol, veh/h 455 357 1500 1187
Approach Delay, s/veh 29.5 37.5 25.4 27.4
Approach LOS C D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 27.8 12.0 20.6 13.0 21.7 6.8 25.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 8.0 23.0 9.0 19.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 16.5 8.8 14.9 9.4 15.7 3.6 4.7 Green Ext Time (p_c), s 0.0 3.8 0.0 1.0 0.0 2.0 0.0 0.6 Intersection Summary
HCM 7th Control Delay, s/veh 27.8
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 18 4 35 91 9 50 53 1412 126 63 1445 28 Future Volume (veh/h) 18 4 35 91 9 50 53 1412 126 63 1445 28 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 20 4 38 99 10 54 58 1535 137 68 1571 30 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 44 19 182 277 338 282 104 1961 606 115 1994 604 Arrive On Green 0.02 0.12 0.12 0.08 0.18 0.18 0.06 0.38 0.38 0.06 0.38 0.38 Sat Flow, veh/h 1810 156 1478 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 20 0 42 99 10 54 58 1535 137 68 1571 30 Grp Sat Flow(s),veh/h/ln 1810 0 1634 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.5 0.0 1.0 1.2 0.2 1.3 1.4 11.8 2.6 1.6 12.0 0.5 Cycle Q Clear(g_c), s 0.5 0.0 1.0 1.2 0.2 1.3 1.4 11.8 2.6 1.6 12.0 0.5 Prop In Lane 1.00 0.90 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 44 0 202 277 338 282 104 1961 606 115 1994 604 V/C Ratio(X) 0.45 0.00 0.21 0.36 0.03 0.19 0.56 0.78 0.23 0.59 0.79 0.05 Avail Cap(c_a), veh/h 201 0 945 390 1099 919 201 2077 642 201 2077 629 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.6 0.0 17.7 19.6 15.3 15.7 20.6 12.3 9.5 20.5 12.2 8.7 Incr Delay (d2), s/veh 6.9 0.0 0.5 0.8 0.0 0.3 4.6 1.9 0.2 4.7 2.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 0.3 0.4 0.1 0.4 0.6 3.1 0.7 0.7 3.1 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.6 0.0 18.2 20.4 15.3 16.1 25.3 14.3 9.7 25.2 14.2 8.7 LnGrp LOS C B C B B C B A C B A
Approach Vol, veh/h 62 163 1730 1669
Approach Delay, s/veh 21.6 18.6 14.3 14.6
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 21.0 7.5 9.5 6.6 21.3 5.1 12.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.6 13.8 3.2 3.0 3.4 14.0 2.5 3.3 Green Ext Time (p_c), s 0.0 3.2 0.0 0.1 0.0 3.0 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 14.7
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 153 0 191 0 0 0 178 1454 0 0 1368 190 Future Volume (veh/h) 153 0 191 0 0 0 178 1454 0 0 1368 190 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 166 0 208 0 0 0 193 1580 0 0 1487 207 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1017 0 315 0 372 0 245 3220 0 0 2042 634
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.62 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 166 0 208 0 0 0 193 1580 0 0 1487 207 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.7 0.0 5.2 0.0 0.0 0.0 4.5 7.2 0.0 0.0 10.6 3.9 Cycle Q Clear(g_c), s 1.7 0.0 5.2 0.0 0.0 0.0 4.5 7.2 0.0 0.0 10.6 3.9 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1017 0 315 0 372 0 245 3220 0 0 2042 634 V/C Ratio(X) 0.16 0.00 0.66 0.00 0.00 0.00 0.79 0.49 0.00 0.00 0.73 0.33 Avail Cap(c_a), veh/h 2102 0 813 0 959 0 291 3570 0 0 2261 702 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.8 0.0 16.2 0.0 0.0 0.0 18.2 4.5 0.0 0.0 11.2 9.2 Incr Delay (d2), s/veh 0.1 0.0 2.4 0.0 0.0 0.0 11.6 0.1 0.0 0.0 1.1 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 1.6 0.0 0.0 0.0 2.2 0.5 0.0 0.0 2.5 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.9 0.0 18.5 0.0 0.0 0.0 29.8 4.6 0.0 0.0 12.3 9.5 LnGrp LOS B B C A B A
Approach Vol, veh/h 374 0 1773 1694
Approach Delay, s/veh 16.9 0.0 7.4 12.0
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 31.1 12.5 9.9 21.2 12.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 9.2 7.2 6.5 12.6 0.0
Green Ext Time (p_c), s 10.5 1.4 0.0 4.5 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 10.3
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 64 11 1974 76 9 1853
Future Volume (veh/h) 64 11 1974 76 9 1853
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 70 12 2146 83 10 2014
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 131 117 3147 977 33 3725
Arrive On Green 0.07 0.07 0.61 0.61 0.02 0.72
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 70 12 2146 83 10 2014
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 1.6 0.3 11.9 0.9 0.2 7.7
Cycle Q Clear(g_c), s 1.6 0.3 11.9 0.9 0.2 7.7
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 131 117 3147 977 33 3725
V/C Ratio(X) 0.53 0.10 0.68 0.08 0.30 0.54
Avail Cap(c_a), veh/h 1052 936 3618 1123 295 4945
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 19.2 18.6 5.7 3.5 20.8 2.8
Incr Delay (d2), s/veh 3.3 0.4 0.4 0.0 5.0 0.1
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.7 0.1 1.0 0.1 0.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.6 19.0 6.1 3.5 25.8 2.9
LnGrp LOS C B A A C A
Approach Vol, veh/h 82 2229 2024
Approach Delay, s/veh 22.0 6.0 3.0
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 4.8 30.1 34.9 8.1
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.2 13.9 9.7 3.6
Green Ext Time (p_c), s 0.0 12.2 17.7 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 4.9
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 349 248 0 1886 1865 725
Future Volume (veh/h) 349 248 0 1886 1865 725
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 429 216 0 2050 2027 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 715 318 0 3259 3259
Arrive On Green 0.20 0.20 0.00 0.63 0.63 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 429 216 0 2050 2027 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 5.0 5.7 0.0 11.2 11.0 0.0
Cycle Q Clear(g_c), s 5.0 5.7 0.0 11.2 11.0 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 715 318 0 3259 3259
V/C Ratio(X) 0.60 0.68 0.00 0.63 0.62
Avail Cap(c_a), veh/h 1102 490 0 4286 4286
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 16.8 17.1 0.0 5.3 5.2 0.0
Incr Delay (d2), s/veh 0.8 2.5 0.0 0.2 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.9 2.1 0.0 0.9 0.9 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.6 19.6 0.0 5.5 5.4 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 645 2050 2027
Approach Delay, s/veh 18.3 5.5 5.4
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 32.9 13.1 32.9
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 38.0 14.0 38.0
Max Q Clear Time (g_c+I1), s 13.2 7.7 13.0
Green Ext Time (p_c), s 15.7 1.4 15.6
Intersection Summary
HCM 7th Control Delay, s/veh 7.2
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 450 0 157 0 1739 705 659 1463 0 Future Volume (veh/h) 0 0 0 450 0 157 0 1739 705 659 1463 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 474 0 165 0 1831 742 694 1540 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 610 0 543 0 2275 969 789 3732 0
Arrive On Green 0.00 0.00 0.00 0.17 0.00 0.17 0.00 0.44 0.44 0.22 0.72 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 474 0 165 0 1831 742 694 1540 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 9.0 0.0 3.2 0.0 21.9 24.6 13.7 8.5 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 9.0 0.0 3.2 0.0 21.9 24.6 13.7 8.5 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 610 0 543 0 2275 969 789 3732 0 V/C Ratio(X) 0.00 0.00 0.00 0.78 0.00 0.30 0.00 0.80 0.77 0.88 0.41 0.00 Avail Cap(c_a), veh/h 0 157 0 962 0 1306 0 2321 983 835 3845 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 28.4 0.0 26.0 0.0 17.4 10.3 26.8 4.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 2.2 0.0 0.3 0.0 2.1 3.6 10.3 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 3.7 0.0 1.1 0.0 7.2 6.9 6.1 1.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 30.6 0.0 26.4 0.0 19.5 13.9 37.0 4.1 0.0 LnGrp LOS C C B B D A
Approach Vol, veh/h 0 639 2573 2234
Approach Delay, s/veh 0.0 29.5 17.9 14.3
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 20.1 35.4 16.1 0.0 55.4 16.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 32.0 19.0 6.0 53.0 29.0 Max Q Clear Time (g_c+I1), s 15.7 26.6 11.0 0.0 10.5 5.2 Green Ext Time (p_c), s 0.4 4.8 1.1 0.0 13.4 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 17.8
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/21/2025 Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 161 327 63 199 526 332 242 1614 163 265 973 449 Future Volume (veh/h) 161 327 63 199 526 332 242 1614 163 265 973 449 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 175 355 68 216 572 361 263 1754 177 288 1058 488 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 206 1332 408 299 1469 450 330 1801 181 330 1950 605 Arrive On Green 0.06 0.26 0.26 0.09 0.28 0.28 0.09 0.38 0.38 0.09 0.38 0.38 Sat Flow, veh/h 3510 5187 1589 3510 5187 1588 3510 4790 482 3510 5187 1610 Grp Volume(v), veh/h 175 355 68 216 572 361 263 1265 666 288 1058 488 Grp Sat Flow(s),veh/h/ln 1755 1729 1589 1755 1729 1588 1755 1729 1813 1755 1729 1610 Q Serve(g_s), s 4.2 4.6 2.8 5.1 7.6 17.9 6.2 30.6 30.9 6.9 13.6 23.1 Cycle Q Clear(g_c), s 4.2 4.6 2.8 5.1 7.6 17.9 6.2 30.6 30.9 6.9 13.6 23.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 206 1332 408 299 1469 450 330 1300 682 330 1950 605 V/C Ratio(X) 0.85 0.27 0.17 0.72 0.39 0.80 0.80 0.97 0.98 0.87 0.54 0.81 Avail Cap(c_a), veh/h 206 1767 542 412 2072 635 330 1300 682 330 1950 605 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.7 25.2 24.5 38.0 24.6 28.3 37.8 26.1 26.2 38.1 20.8 23.8 Incr Delay (d2), s/veh 26.8 0.1 0.2 3.9 0.2 5.0 12.8 18.7 28.8 21.7 0.3 7.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 1.8 1.0 2.2 2.9 6.9 3.1 14.1 16.8 3.7 4.8 9.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 66.5 25.3 24.7 41.8 24.7 33.3 50.6 44.8 55.0 59.8 21.1 31.7 LnGrp LOS E C C D C C D D D E C C
Approach Vol, veh/h 598 1149 2194 1834
Approach Delay, s/veh 37.3 30.6 48.6 30.0
Approach LOS D C D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.0 36.0 11.2 25.9 12.0 36.0 9.0 28.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 32.0 10.0 29.0 8.0 32.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 8.9 32.9 7.1 6.6 8.2 25.1 6.2 19.9 Green Ext Time (p_c), s 0.0 0.0 0.2 2.3 0.0 4.3 0.0 4.2 Intersection Summary
HCM 7th Control Delay, s/veh 37.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 207 0 268 0 0 0 114 691 0 0 1138 116 Future Volume (veh/h) 207 0 268 0 0 0 114 691 0 0 1138 116 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 225 0 291 0 0 0 124 751 0 0 1237 126 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 592 0 0 0 5 0 339 3208 0 0 2155 660
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.10 0.62 0.00 0.00 0.42 0.42 Sat Flow, veh/h 3510 225 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 225 14.3 0 0 0 124 751 0 0 1237 126 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 2.1 0.0 0.0 0.0 1.2 2.4 0.0 0.0 6.9 1.9 Cycle Q Clear(g_c), s 2.1 0.0 0.0 0.0 1.2 2.4 0.0 0.0 6.9 1.9 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 592 0 5 0 339 3208 0 0 2155 660
V/C Ratio(X) 0.38 0.00 0.00 0.00 0.37 0.23 0.00 0.00 0.57 0.19 Avail Cap(c_a), veh/h 2617 0 1467 0 467 4281 0 0 3038 931 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 13.9 0.0 0.0 0.0 15.9 3.2 0.0 0.0 8.4 7.0 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 0.0 0.0 0.4 0.1 0.0 0.0 1.3 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.3 0.0 0.0 0.0 16.5 3.2 0.0 0.0 8.7 7.1 LnGrp LOS B B A A A
Approach Vol, veh/h 0 875 1363
Approach Delay, s/veh 0.0 5.1 8.5
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 27.2 7.6 19.6 10.3 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.4 3.2 8.9 4.1 0.0
Green Ext Time (p_c), s 4.9 0.1 6.7 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.8
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 150 959 165 238 472 227 75 490 212 522 783 99 Future Volume (veh/h) 150 959 165 238 472 227 75 490 212 522 783 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 163 1042 179 259 513 247 82 533 230 567 851 108 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 244 1613 490 274 1658 505 189 1142 349 640 1809 553 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.05 0.22 0.22 0.18 0.35 0.35 Sat Flow, veh/h 3510 5187 1577 3510 5187 1579 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 163 1042 179 259 513 247 82 533 230 567 851 108 Grp Sat Flow(s),veh/h/ln 1755 1729 1577 1755 1729 1579 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 3.5 13.3 6.8 5.6 5.7 9.7 1.7 6.9 10.2 12.1 9.8 3.7 Cycle Q Clear(g_c), s 3.5 13.3 6.8 5.6 5.7 9.7 1.7 6.9 10.2 12.1 9.8 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 244 1613 490 274 1658 505 189 1142 349 640 1809 553 V/C Ratio(X) 0.67 0.65 0.36 0.94 0.31 0.49 0.43 0.47 0.66 0.89 0.47 0.20 Avail Cap(c_a), veh/h 274 2296 698 274 2296 699 229 2364 722 640 2972 909 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.9 22.8 20.6 35.2 19.7 21.1 35.2 26.0 27.3 30.6 19.5 17.5 Incr Delay (d2), s/veh 5.2 0.4 0.5 39.5 0.1 0.7 1.6 0.3 2.1 14.1 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 4.9 2.3 3.8 2.1 3.3 0.7 2.6 3.7 5.9 3.5 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.1 23.2 21.0 74.7 19.8 21.8 36.8 26.3 29.4 44.7 19.7 17.6 LnGrp LOS D C C E B C D C C D B B
Approach Vol, veh/h 1384 1019 845 1526
Approach Delay, s/veh 24.9 34.3 28.2 28.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 18.0 20.9 10.0 27.9 8.1 30.8 9.3 28.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 14.0 35.0 6.0 34.0 5.0 44.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 14.1 12.2 7.6 15.3 3.7 11.8 5.5 11.7 Green Ext Time (p_c), s 0.0 4.0 0.0 7.2 0.0 6.3 0.0 4.0 Intersection Summary
HCM 7th Control Delay, s/veh 28.7
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/21/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 58 89 184 86 37 72 98 692 61 53 1101 56 Future Volume (veh/h) 58 89 184 86 37 72 98 692 61 53 1101 56 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 63 97 200 93 40 78 107 752 66 58 1197 61 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 98 326 276 167 398 332 138 1989 604 94 1861 565 Arrive On Green 0.05 0.17 0.17 0.09 0.21 0.21 0.08 0.38 0.38 0.05 0.36 0.36 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 63 97 200 93 40 78 107 752 66 58 1197 61 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.0 2.7 7.0 2.9 1.0 2.4 3.5 6.2 1.6 1.9 11.5 1.5 Cycle Q Clear(g_c), s 2.0 2.7 7.0 2.9 1.0 2.4 3.5 6.2 1.6 1.9 11.5 1.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 98 326 276 167 398 332 138 1989 604 94 1861 565 V/C Ratio(X) 0.64 0.30 0.72 0.56 0.10 0.23 0.77 0.38 0.11 0.62 0.64 0.11 Avail Cap(c_a), veh/h 273 1240 1051 212 1176 983 212 2864 870 242 2951 896 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.7 21.6 23.4 26.0 19.1 19.6 27.1 13.3 11.9 27.8 16.0 12.8 Incr Delay (d2), s/veh 6.8 0.5 3.6 2.9 0.1 0.4 9.1 0.1 0.1 6.5 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 1.2 2.8 1.3 0.4 0.9 1.7 1.9 0.5 0.9 3.6 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.5 22.1 27.0 28.9 19.2 20.0 36.2 13.4 11.9 34.3 16.3 12.9 LnGrp LOS C C C C B C D B B C B B
Approach Vol, veh/h 360 211 925 1316
Approach Delay, s/veh 27.0 23.8 15.9 17.0
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.1 26.9 9.5 16.2 8.6 25.4 7.2 18.5 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 33.0 7.0 39.0 7.0 34.0 9.0 37.0 Max Q Clear Time (g_c+I1), s 3.9 8.2 4.9 9.0 5.5 13.5 4.0 4.4 Green Ext Time (p_c), s 0.0 5.0 0.0 1.2 0.0 7.9 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 18.4
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 25 991 6 3 1492 25 9 2 2 52 0 49 Future Volume (veh/h) 25 991 6 3 1492 25 9 2 2 52 0 49
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 26 1043 6 3 1571 26 9 2 2 55 0 52
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 58 2474 14 7 2296 38 352 79 47 267 44 150
Arrive On Green 0.03 0.46 0.46 0.00 0.44 0.44 0.20 0.20 0.20 0.20 0.00 0.20 Sat Flow, veh/h 1810 5322 31 1810 5253 87 928 402 242 585 223 764 Grp Volume(v), veh/h 26 678 371 3 1034 563 13 0 0 107 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1894 1810 1729 1882 1571 0 0 1573 0 0 Q Serve(g_s), s 0.5 4.7 4.7 0.1 8.6 8.6 0.0 0.0 0.0 0.2 0.0 0.0 Cycle Q Clear(g_c), s 0.5 4.7 4.7 0.1 8.6 8.6 0.2 0.0 0.0 1.9 0.0 0.0 Prop In Lane 1.00 0.02 1.00 0.05 0.69 0.15 0.51 0.49
Lane Grp Cap(c), veh/h 58 1607 881 7 1511 822 478 0 0 460 0 0 V/C Ratio(X) 0.45 0.42 0.42 0.40 0.68 0.68 0.03 0.00 0.00 0.23 0.00 0.00 Avail Cap(c_a), veh/h 253 1740 953 253 1740 947 1217 0 0 1222 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.0 6.4 6.4 17.8 8.1 8.1 11.7 0.0 0.0 12.3 0.0 0.0 Incr Delay (d2), s/veh 5.4 0.2 0.3 31.7 0.9 1.7 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.7 0.8 0.1 1.5 1.8 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.5 6.5 6.7 49.5 9.0 9.8 11.7 0.0 0.0 12.6 0.0 0.0 LnGrp LOS C A A D A A B B
Approach Vol, veh/h 1075 1600 13 107
Approach Delay, s/veh 7.0 9.4 11.7 12.6
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 20.6 11.0 5.1 19.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 6.7 3.9 2.5 10.6
Green Ext Time (p_c), s 0.0 0.0 4.6 0.5 0.0 5.0
Intersection Summary
HCM 7th Control Delay, s/veh 8.6
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 196 645 393 268 907 258 434 1677 215 265 1345 183 Future Volume (veh/h) 196 645 393 268 907 258 434 1677 215 265 1345 183 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 206 679 414 282 955 272 457 1765 226 279 1416 193 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 262 1389 426 304 1451 584 498 1923 736 304 1637 628 Arrive On Green 0.08 0.29 0.29 0.09 0.30 0.30 0.15 0.40 0.40 0.09 0.34 0.34 Sat Flow, veh/h 3291 4863 1490 3291 4863 1490 3291 4863 1509 3291 4863 1508 Grp Volume(v), veh/h 206 679 414 282 955 272 457 1765 226 279 1416 193 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1490 1646 1621 1509 1646 1621 1508 Q Serve(g_s), s 7.3 13.8 32.7 10.1 20.4 16.2 16.3 41.0 10.7 10.0 32.4 10.2 Cycle Q Clear(g_c), s 7.3 13.8 32.7 10.1 20.4 16.2 16.3 41.0 10.7 10.0 32.4 10.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 262 1389 426 304 1451 584 498 1923 736 304 1637 628 V/C Ratio(X) 0.79 0.49 0.97 0.93 0.66 0.47 0.92 0.92 0.31 0.92 0.87 0.31 Avail Cap(c_a), veh/h 332 1389 426 304 1451 584 498 1960 748 304 1674 639 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 53.8 35.3 42.1 53.6 36.5 27.0 49.8 34.2 18.4 53.6 37.0 23.3 Incr Delay (d2), s/veh 9.4 0.3 36.4 33.2 1.1 0.6 22.2 7.4 0.2 31.2 4.9 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.3 5.3 15.7 5.4 7.8 5.5 7.9 16.1 3.5 5.3 12.7 3.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 63.2 35.6 78.5 86.9 37.6 27.6 72.0 41.5 18.6 84.8 41.9 23.6 LnGrp LOS E D E F D C E D B F D C
Approach Vol, veh/h 1299 1509 2448 1888
Approach Delay, s/veh 53.7 45.0 45.1 46.4
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 15.0 51.1 15.0 38.0 22.0 44.1 13.5 39.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 48.0 11.0 34.0 18.0 41.0 12.0 33.0 Max Q Clear Time (g_c+I1), s 12.0 43.0 12.1 34.7 18.3 34.4 9.3 22.4 Green Ext Time (p_c), s 0.0 4.1 0.0 0.0 0.0 4.5 0.2 5.0 Intersection Summary
HCM 7th Control Delay, s/veh 47.0
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Rosedale Highway & NW Promenade 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 153 1123 1355 137 171 109
Future Volume (veh/h) 153 1123 1355 137 171 109
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 166 1221 1473 149 186 118
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 363 3319 2277 706 580 266
Arrive On Green 0.10 0.64 0.44 0.44 0.17 0.17
Sat Flow, veh/h 3510 5358 5358 1608 3510 1610
Grp Volume(v), veh/h 166 1221 1473 149 186 118
Grp Sat Flow(s),veh/h/ln 1755 1729 1729 1608 1755 1610
Q Serve(g_s), s 1.8 4.6 9.1 2.4 1.9 2.7
Cycle Q Clear(g_c), s 1.8 4.6 9.1 2.4 1.9 2.7
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 363 3319 2277 706 580 266
V/C Ratio(X) 0.46 0.37 0.65 0.21 0.32 0.44
Avail Cap(c_a), veh/h 428 3917 2780 862 2651 1216
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 17.3 3.5 9.0 7.1 15.1 15.4
Incr Delay (d2), s/veh 0.9 0.1 0.4 0.1 0.3 1.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.2 1.9 0.0 0.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 18.2 3.5 9.4 7.3 15.4 16.6
LnGrp LOS B A A A B B
Approach Vol, veh/h 1387 1622 304
Approach Delay, s/veh 5.3 9.2 15.9
Approach LOS A A B
Timer - Assigned Phs 4 6 7 8
Phs Duration (G+Y+Rc), s 30.3 10.8 8.2 22.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 31.0 5.0 22.0
Max Q Clear Time (g_c+I1), s 6.6 4.7 3.8 11.1
Green Ext Time (p_c), s 8.5 1.0 0.1 6.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.2
HCM 7th LOS A
" +++ 1 7 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 148 1009 30 86 1243 140 30 30 46 215 53 158 Future Volume (veh/h) 148 1009 30 86 1243 140 30 30 46 215 53 158 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 156 1062 32 91 1308 147 32 32 48 226 56 166 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 297 2065 641 126 1986 617 124 474 210 355 712 311 Arrive On Green 0.08 0.40 0.40 0.07 0.38 0.38 0.04 0.13 0.13 0.10 0.20 0.20 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1599 3510 3610 1580 Grp Volume(v), veh/h 156 1062 32 91 1308 147 32 32 48 226 56 166 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1599 1755 1805 1580 Q Serve(g_s), s 2.3 8.3 0.7 2.6 11.1 3.3 0.5 0.4 1.4 3.3 0.7 5.0 Cycle Q Clear(g_c), s 2.3 8.3 0.7 2.6 11.1 3.3 0.5 0.4 1.4 3.3 0.7 5.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 297 2065 641 126 1986 617 124 474 210 355 712 311 V/C Ratio(X) 0.53 0.51 0.05 0.72 0.66 0.24 0.26 0.07 0.23 0.64 0.08 0.53 Avail Cap(c_a), veh/h 395 2529 785 238 2626 815 329 2099 930 658 2437 1067 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 23.4 12.1 9.9 24.3 13.6 11.2 25.0 20.3 20.7 23.0 17.5 19.2 Incr Delay (d2), s/veh 1.4 0.2 0.0 7.7 0.4 0.2 1.1 0.1 0.5 1.9 0.0 1.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 2.3 0.2 1.2 3.2 0.9 0.2 0.2 0.5 1.3 0.2 1.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.8 12.3 9.9 32.0 14.0 11.4 26.1 20.4 21.3 24.9 17.5 20.6 LnGrp LOS C B A C B B C C C C B C
Approach Vol, veh/h 1250 1546 112 448
Approach Delay, s/veh 13.8 14.8 22.4 22.4
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.4 11.0 7.7 25.2 5.9 14.5 8.5 24.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 31.0 7.0 26.0 5.0 36.0 6.0 27.0 Max Q Clear Time (g_c+I1), s 5.3 3.4 4.6 10.3 2.5 7.0 4.3 13.1 Green Ext Time (p_c), s 0.3 0.3 0.0 6.1 0.0 0.8 0.1 7.3 Intersection Summary
HCM 7th Control Delay, s/veh 15.7
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 225 883 402 262 585 134 355 1153 388 130 967 196 Future Volume (veh/h) 225 883 402 262 585 134 355 1153 388 130 967 196 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 237 929 423 276 616 141 374 1214 408 137 1018 206 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 294 1402 434 335 1462 453 436 2019 626 194 1156 509 Arrive On Green 0.09 0.29 0.29 0.10 0.30 0.30 0.13 0.41 0.41 0.06 0.34 0.34 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 237 929 423 276 616 141 374 1214 408 137 1018 206 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 7.8 18.7 30.8 9.1 11.3 8.0 12.3 21.7 24.1 4.5 31.5 11.8 Cycle Q Clear(g_c), s 7.8 18.7 30.8 9.1 11.3 8.0 12.3 21.7 24.1 4.5 31.5 11.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 294 1402 434 335 1462 453 436 2019 626 194 1156 509 V/C Ratio(X) 0.80 0.66 0.97 0.82 0.42 0.31 0.86 0.60 0.65 0.71 0.88 0.41 Avail Cap(c_a), veh/h 326 1402 434 386 1490 462 504 2191 680 267 1281 564 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 50.0 35.2 39.5 49.3 31.5 30.4 47.6 25.7 26.5 51.8 34.9 28.4 Incr Delay (d2), s/veh 12.6 1.2 36.3 12.1 0.2 0.4 12.4 0.4 2.0 5.1 6.9 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.6 7.2 15.2 4.2 4.3 2.8 5.6 7.9 8.4 2.0 13.3 4.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 62.6 36.4 75.8 61.4 31.7 30.8 60.0 26.1 28.4 56.9 41.8 28.9 LnGrp LOS E D E E C C E C C E D C
Approach Vol, veh/h 1589 1033 1996 1361
Approach Delay, s/veh 50.8 39.5 32.9 41.3
Approach LOS D D C D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.5 50.1 15.3 36.0 18.7 41.9 13.9 37.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 50.0 13.0 32.0 17.0 42.0 11.0 34.0 Max Q Clear Time (g_c+I1), s 6.5 23.7 11.1 32.8 14.3 33.5 9.8 13.3 Green Ext Time (p_c), s 0.1 6.4 0.2 0.0 0.4 4.4 0.1 4.1 Intersection Summary
HCM 7th Control Delay, s/veh 40.7
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 112 744 20 21 1005 280 47 39 28 180 47 115 Future Volume (veh/h) 112 744 20 21 1005 280 47 39 28 180 47 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 118 783 21 22 1058 295 49 41 29 189 49 121 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 152 2125 656 47 1270 563 87 270 227 240 430 363 Arrive On Green 0.08 0.41 0.41 0.03 0.35 0.35 0.05 0.14 0.14 0.13 0.23 0.23 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 118 783 21 22 1058 295 49 41 29 189 49 121 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.5 5.8 0.4 0.7 14.8 8.1 1.5 1.0 0.9 5.6 1.1 3.5 Cycle Q Clear(g_c), s 3.5 5.8 0.4 0.7 14.8 8.1 1.5 1.0 0.9 5.6 1.1 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 152 2125 656 47 1270 563 87 270 227 240 430 363 V/C Ratio(X) 0.78 0.37 0.03 0.47 0.83 0.52 0.57 0.15 0.13 0.79 0.11 0.33 Avail Cap(c_a), veh/h 164 2125 656 164 1440 639 164 896 754 361 1102 930 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.8 11.3 9.7 26.5 16.4 14.2 25.7 20.8 20.7 23.2 16.9 17.8 Incr Delay (d2), s/veh 19.6 0.1 0.0 7.1 3.9 0.8 5.7 0.3 0.3 6.6 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 1.6 0.1 0.3 5.3 2.3 0.7 0.4 0.3 2.6 0.5 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 44.3 11.4 9.8 33.6 20.3 15.0 31.4 21.0 20.9 29.8 17.1 18.4 LnGrp LOS D B A C C B C C C C B B
Approach Vol, veh/h 922 1375 119 359
Approach Delay, s/veh 15.6 19.4 25.3 24.2
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.3 11.8 5.4 26.6 6.6 16.5 8.6 23.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 26.0 5.0 22.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 7.6 3.0 2.7 7.8 3.5 5.5 5.5 16.8 Green Ext Time (p_c), s 0.2 0.2 0.0 4.1 0.0 0.6 0.0 2.6 Intersection Summary
HCM 7th Control Delay, s/veh 19.0
HCM 7th LOS B
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 33 834 158 97 825 8 207 34 89 33 28 8 Future Volume (veh/h) 33 834 158 97 825 8 207 34 89 33 28 8 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 35 878 166 102 868 8 218 36 94 35 29 8 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 69 1151 497 135 1282 567 274 492 416 69 277 230 Arrive On Green 0.04 0.32 0.32 0.07 0.36 0.36 0.15 0.26 0.26 0.04 0.15 0.15 Sat Flow, veh/h 1810 3610 1559 1810 3610 1597 1810 1900 1606 1810 1900 1582 Grp Volume(v), veh/h 35 878 166 102 868 8 218 36 94 35 29 8 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1597 1810 1900 1606 1810 1900 1582 Q Serve(g_s), s 1.0 11.3 4.2 2.9 10.5 0.2 6.0 0.7 2.4 1.0 0.7 0.2 Cycle Q Clear(g_c), s 1.0 11.3 4.2 2.9 10.5 0.2 6.0 0.7 2.4 1.0 0.7 0.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 69 1151 497 135 1282 567 274 492 416 69 277 230 V/C Ratio(X) 0.51 0.76 0.33 0.76 0.68 0.01 0.80 0.07 0.23 0.51 0.10 0.03 Avail Cap(c_a), veh/h 175 1468 634 175 1468 649 385 1214 1026 175 993 827 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.4 15.8 13.4 23.4 14.1 10.8 21.1 14.5 15.1 24.4 19.1 18.9 Incr Delay (d2), s/veh 5.6 1.8 0.4 12.9 1.1 0.0 7.6 0.1 0.3 5.6 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 3.8 1.2 1.5 3.3 0.0 2.8 0.3 0.7 0.5 0.3 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.0 17.7 13.8 36.3 15.2 10.8 28.7 14.5 15.3 30.0 19.3 19.0 LnGrp LOS C B B D B B C B B C B B
Approach Vol, veh/h 1079 978 348 72
Approach Delay, s/veh 17.5 17.4 23.6 24.5
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.0 17.4 7.8 20.5 11.8 11.5 6.0 22.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 5.0 21.0 11.0 27.0 5.0 21.0 Max Q Clear Time (g_c+I1), s 3.0 4.4 4.9 13.3 8.0 2.7 3.0 12.5 Green Ext Time (p_c), s 0.0 0.4 0.0 2.9 0.2 0.1 0.0 3.4 Intersection Summary
HCM 7th Control Delay, s/veh 18.5
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 237 3 692 714 687 732 318 1415 23 6 1798 244 Future Volume (veh/h) 237 3 692 714 687 732 318 1415 23 6 1798 244 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 246 0 713 807 609 755 328 1459 24 6 1854 252 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 488 0 433 976 512 867 325 2142 35 40 1748 542 Arrive On Green 0.14 0.00 0.14 0.28 0.28 0.28 0.10 0.42 0.42 0.02 0.35 0.35 Sat Flow, veh/h 3506 0 3113 3506 1841 3117 3401 5092 84 1753 5025 1559 Grp Volume(v), veh/h 246 0 713 807 609 755 328 960 523 6 1854 252 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1826 1753 1675 1559 Q Serve(g_s), s 7.5 0.0 16.0 24.8 32.0 26.5 11.0 26.8 26.8 0.4 40.0 14.5 Cycle Q Clear(g_c), s 7.5 0.0 16.0 24.8 32.0 26.5 11.0 26.8 26.8 0.4 40.0 14.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.05 1.00 1.00
Lane Grp Cap(c), veh/h 488 0 433 976 512 867 325 1409 768 40 1748 542 V/C Ratio(X) 0.50 0.00 1.65 0.83 1.19 0.87 1.01 0.68 0.68 0.15 1.06 0.46 Avail Cap(c_a), veh/h 488 0 433 976 512 867 325 1409 768 229 1748 542 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 45.8 0.0 49.5 38.9 41.5 39.5 52.0 27.0 27.0 55.1 37.5 29.2 Incr Delay (d2), s/veh 0.8 0.0 301.0 6.0 103.3 9.6 52.0 1.4 2.5 1.7 39.7 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.2 0.0 24.1 10.9 28.4 10.7 6.8 10.0 11.2 0.2 21.4 5.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 46.7 0.0 350.5 44.9 144.8 49.1 104.0 28.4 29.5 56.8 77.2 29.8 LnGrp LOS D F D F D F C C E F C
Approach Vol, veh/h 959 2171 1811 2112
Approach Delay, s/veh 272.6 74.4 42.4 71.5
Approach LOS F E D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.6 52.4 20.0 15.0 44.0 36.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 15.0 36.0 16.0 11.0 40.0 32.0 Max Q Clear Time (g_c+I1), s 2.4 28.8 18.0 13.0 42.0 34.0 Green Ext Time (p_c), s 0.0 4.6 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 92.2
HCM 7th LOS F
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 636 62 89 965 55 61
Future Volume (veh/h) 636 62 89 965 55 61
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 669 65 94 1016 58 64
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1185 115 164 2099 120 133
Arrive On Green 0.36 0.36 0.09 0.58 0.15 0.15
Sat Flow, veh/h 3418 323 1810 3705 802 885
Grp Volume(v), veh/h 363 371 94 1016 123 0
Grp Sat Flow(s),veh/h/ln 1805 1840 1810 1805 1701 0
Q Serve(g_s), s 4.8 4.8 1.5 4.9 2.0 0.0
Cycle Q Clear(g_c), s 4.8 4.8 1.5 4.9 2.0 0.0
Prop In Lane 0.18 1.00 0.47 0.52
Lane Grp Cap(c), veh/h 644 656 164 2099 255 0
V/C Ratio(X) 0.56 0.57 0.57 0.48 0.48 0.00
Avail Cap(c_a), veh/h 1454 1482 607 4603 799 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 7.7 7.7 13.0 3.6 11.6 0.0
Incr Delay (d2), s/veh 0.8 0.8 3.1 0.2 1.4 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.9 0.5 0.1 0.7 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.5 8.5 16.1 3.8 13.0 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 734 1110 123
Approach Delay, s/veh 8.5 4.8 13.0
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 8.5 6.7 14.6 21.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 14.0 10.0 24.0 38.0
Max Q Clear Time (g_c+I1), s 4.0 3.5 6.8 6.9
Green Ext Time (p_c), s 0.2 0.1 3.7 7.4
Intersection Summary
HCM 7th Control Delay, s/veh 6.7
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 182 259 192 184 389 301 253 1459 129 219 1361 149 Future Volume (veh/h) 182 259 192 184 389 301 253 1459 129 219 1361 149 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 192 273 202 194 409 317 266 1536 136 231 1433 157 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 322 954 736 322 954 424 328 1753 536 325 1749 542 Arrive On Green 0.09 0.26 0.26 0.09 0.26 0.26 0.09 0.34 0.34 0.09 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 192 273 202 194 409 317 266 1536 136 231 1433 157 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 3.9 4.5 4.3 4.0 7.0 13.6 5.6 20.9 4.7 4.8 19.0 5.4 Cycle Q Clear(g_c), s 3.9 4.5 4.3 4.0 7.0 13.6 5.6 20.9 4.7 4.8 19.0 5.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 322 954 736 322 954 424 328 1753 536 325 1749 542 V/C Ratio(X) 0.60 0.29 0.27 0.60 0.43 0.75 0.81 0.88 0.25 0.71 0.82 0.29 Avail Cap(c_a), veh/h 422 1638 1263 328 1541 684 328 1799 551 328 1799 558 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.7 21.9 21.9 32.7 22.9 25.3 33.3 23.3 18.0 33.0 22.7 18.2 Incr Delay (d2), s/veh 1.8 0.2 0.2 3.0 0.3 2.7 14.2 5.1 0.2 6.9 3.1 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 1.7 1.3 1.7 2.7 4.9 2.8 8.1 1.5 2.2 7.1 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.5 22.1 22.1 35.7 23.2 28.0 47.6 28.5 18.2 39.9 25.8 18.5 LnGrp LOS C C C D C C D C B D C B
Approach Vol, veh/h 667 920 1938 1821
Approach Delay, s/veh 25.7 27.5 30.4 27.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 29.3 10.9 23.8 11.0 29.3 10.9 23.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 26.0 7.0 34.0 7.0 26.0 9.0 32.0 Max Q Clear Time (g_c+I1), s 6.8 22.9 6.0 6.5 7.6 21.0 5.9 15.6 Green Ext Time (p_c), s 0.0 2.5 0.1 2.3 0.0 3.6 0.2 3.1 Intersection Summary
HCM 7th Control Delay, s/veh 28.1
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 541 27 55 741 21 35 3 72 4 4 11 Future Volume (veh/h) 10 541 27 55 741 21 35 3 72 4 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 569 28 58 780 22 37 3 76 4 4 12 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 996 429 143 1201 34 255 21 244 51 51 153
Arrive On Green 0.02 0.28 0.28 0.08 0.34 0.34 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1554 1810 3582 101 1680 136 1607 339 339 1018 Grp Volume(v), veh/h 11 569 28 58 393 409 40 0 76 20 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1554 1810 1805 1878 1816 0 1607 1697 0 0 Q Serve(g_s), s 0.3 6.3 0.6 1.4 8.6 8.6 0.9 0.0 2.0 0.5 0.0 0.0 Cycle Q Clear(g_c), s 0.3 6.3 0.6 1.4 8.6 8.6 0.9 0.0 2.0 0.5 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.05 0.92 1.00 0.20 0.60
Lane Grp Cap(c), veh/h 36 996 429 143 605 630 276 0 244 255 0 0 V/C Ratio(X) 0.30 0.57 0.07 0.40 0.65 0.65 0.15 0.00 0.31 0.08 0.00 0.00 Avail Cap(c_a), veh/h 271 2167 933 271 1083 1127 856 0 758 255 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 22.5 14.5 12.5 20.4 13.2 13.2 17.2 0.0 17.6 17.1 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.5 0.1 1.8 1.2 1.1 0.2 0.0 0.7 0.1 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.0 0.2 0.6 2.6 2.7 0.3 0.0 0.6 0.2 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.2 15.0 12.5 22.3 14.4 14.3 17.4 0.0 18.3 17.2 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 608 860 116 20
Approach Delay, s/veh 15.1 14.9 18.0 17.2
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 7.7 16.9 11.0 4.9 19.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 7.0 28.0 7.0 7.0 28.0
Max Q Clear Time (g_c+I1), s 4.0 3.4 8.3 2.5 2.3 10.6
Green Ext Time (p_c), s 0.3 0.0 3.3 0.0 0.0 4.1
Intersection Summary
HCM 7th Control Delay, s/veh 15.2
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 35 333 115 165 387 117 112 137 131 68 78 19 Future Volume (veh/h) 35 333 115 165 387 117 112 137 131 68 78 19 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 37 351 121 174 407 123 118 144 138 72 82 20 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 94 551 246 267 639 285 232 866 681 139 675 165 Arrive On Green 0.05 0.15 0.15 0.08 0.18 0.18 0.07 0.46 0.46 0.08 0.47 0.47 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1495 1810 1447 353 Grp Volume(v), veh/h 37 351 121 174 407 123 118 144 138 72 0 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1495 1810 0 1800 Q Serve(g_s), s 1.3 6.1 4.6 3.2 7.0 4.6 2.2 3.0 3.7 2.6 0.0 2.2 Cycle Q Clear(g_c), s 1.3 6.1 4.6 3.2 7.0 4.6 2.2 3.0 3.7 2.6 0.0 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.20
Lane Grp Cap(c), veh/h 94 551 246 267 639 285 232 866 681 139 0 840 V/C Ratio(X) 0.39 0.64 0.49 0.65 0.64 0.43 0.51 0.17 0.20 0.52 0.00 0.12 Avail Cap(c_a), veh/h 189 1344 599 366 1344 599 314 962 757 216 0 965 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 30.8 26.7 26.1 30.2 25.6 24.6 30.3 10.8 11.0 29.8 0.0 10.1 Incr Delay (d2), s/veh 2.7 1.2 1.5 2.7 1.1 1.0 1.7 0.1 0.1 2.9 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.4 1.7 1.3 2.7 1.6 0.9 1.0 1.0 1.1 0.0 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 33.5 27.9 27.6 32.8 26.7 25.7 32.0 10.8 11.1 32.7 0.0 10.2 LnGrp LOS C C C C C C C B B C B
Approach Vol, veh/h 509 704 400 174
Approach Delay, s/veh 28.2 28.0 17.2 19.5
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.2 34.6 9.1 14.3 8.4 35.3 7.5 15.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 34.0 7.0 25.0 6.0 36.0 7.0 25.0 Max Q Clear Time (g_c+I1), s 4.6 5.7 5.2 8.1 4.2 4.2 3.3 9.0 Green Ext Time (p_c), s 0.0 1.2 0.1 2.1 0.0 0.5 0.0 2.4 Intersection Summary
HCM 7th Control Delay, s/veh 24.8
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 45 373 48 53 362 101 41 35 49 122 33 57 Future Volume (veh/h) 45 373 48 53 362 101 41 35 49 122 33 57 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 393 51 56 381 106 43 37 52 128 35 60 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 93 801 355 106 827 366 168 391 330 340 484 404 Arrive On Green 0.05 0.22 0.22 0.06 0.23 0.23 0.05 0.21 0.21 0.10 0.25 0.25 Sat Flow, veh/h 1810 3610 1599 1810 3610 1600 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 47 393 51 56 381 106 43 37 52 128 35 60 Grp Sat Flow(s),veh/h/ln 1810 1805 1599 1810 1805 1600 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 1.0 3.6 1.0 1.2 3.5 2.1 0.5 0.6 1.0 1.3 0.5 1.1 Cycle Q Clear(g_c), s 1.0 3.6 1.0 1.2 3.5 2.1 0.5 0.6 1.0 1.3 0.5 1.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 93 801 355 106 827 366 168 391 330 340 484 404 V/C Ratio(X) 0.51 0.49 0.14 0.53 0.46 0.29 0.26 0.09 0.16 0.38 0.07 0.15 Avail Cap(c_a), veh/h 283 2445 1083 283 2445 1083 457 1782 1504 549 1831 1527 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.7 13.0 12.0 17.6 12.8 12.2 17.6 12.3 12.5 16.2 10.9 11.1 Incr Delay (d2), s/veh 4.2 0.5 0.2 4.0 0.4 0.4 0.8 0.1 0.2 0.7 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 1.0 0.3 0.5 1.0 0.5 0.2 0.2 0.3 0.4 0.2 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.9 13.5 12.2 21.6 13.2 12.6 18.4 12.5 12.7 16.9 10.9 11.2 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 491 543 132 223
Approach Delay, s/veh 14.2 13.9 14.5 14.5
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.7 11.9 6.2 12.5 5.8 13.8 6.0 12.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 36.0 6.0 26.0 5.0 37.0 6.0 26.0 Max Q Clear Time (g_c+I1), s 3.3 3.0 3.2 5.6 2.5 3.1 3.0 5.5 Green Ext Time (p_c), s 0.1 0.3 0.0 2.3 0.0 0.3 0.0 2.4 Intersection Summary
HCM 7th Control Delay, s/veh 14.2
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 44 159 221 101 263 156 479 1306 161 165 1041 71 Future Volume (veh/h) 44 159 221 101 263 156 479 1306 161 165 1041 71 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 46 167 233 106 277 164 504 1375 169 174 1096 75 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 154 717 319 235 1151 352 558 2094 641 267 1664 510 Arrive On Green 0.04 0.20 0.20 0.07 0.22 0.22 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1585 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 46 167 233 106 277 164 504 1375 169 174 1096 75 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1585 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.8 2.4 8.5 1.8 2.8 5.6 8.9 13.5 4.5 3.0 11.4 2.1 Cycle Q Clear(g_c), s 0.8 2.4 8.5 1.8 2.8 5.6 8.9 13.5 4.5 3.0 11.4 2.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 154 717 319 235 1151 352 558 2094 641 267 1664 510 V/C Ratio(X) 0.30 0.23 0.73 0.45 0.24 0.47 0.90 0.66 0.26 0.65 0.66 0.15 Avail Cap(c_a), veh/h 279 1895 844 335 2805 857 558 2887 884 279 2475 758 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.1 21.2 23.6 28.2 20.1 21.2 26.0 15.2 12.5 28.2 18.4 15.2 Incr Delay (d2), s/veh 1.1 0.2 3.2 1.3 0.1 1.0 18.0 0.4 0.2 5.0 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.9 3.1 0.7 1.0 1.9 4.6 4.2 1.3 1.3 3.8 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.2 21.3 26.8 29.6 20.2 22.2 43.9 15.6 12.7 33.2 18.8 15.4 LnGrp LOS C C C C C C D B B C B B
Approach Vol, veh/h 446 547 2048 1345
Approach Delay, s/veh 25.1 22.6 22.3 20.5
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.8 29.4 8.2 16.5 14.0 24.2 6.8 17.9 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.0 15.5 3.8 10.5 10.9 13.4 2.8 7.6 Green Ext Time (p_c), s 0.0 9.5 0.0 1.6 0.0 6.6 0.0 2.1 Intersection Summary
HCM 7th Control Delay, s/veh 22.1
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 35 465 184 237 837 36 311 708 222 58 692 71 Future Volume (veh/h) 35 465 184 237 837 36 311 708 222 58 692 71 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 37 489 194 249 881 38 327 745 234 61 728 75 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 133 986 439 356 1187 51 393 1145 507 183 1335 411 Arrive On Green 0.04 0.27 0.27 0.10 0.34 0.34 0.11 0.32 0.32 0.05 0.26 0.26 Sat Flow, veh/h 3510 3610 1607 3510 3525 152 3510 3610 1600 3510 5187 1597 Grp Volume(v), veh/h 37 489 194 249 451 468 327 745 234 61 728 75 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1872 1755 1805 1600 1755 1729 1597 Q Serve(g_s), s 0.6 7.1 6.2 4.3 13.8 13.8 5.7 11.1 7.3 1.0 7.6 2.3 Cycle Q Clear(g_c), s 0.6 7.1 6.2 4.3 13.8 13.8 5.7 11.1 7.3 1.0 7.6 2.3 Prop In Lane 1.00 1.00 1.00 0.08 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 133 986 439 356 608 631 393 1145 507 183 1335 411 V/C Ratio(X) 0.28 0.50 0.44 0.70 0.74 0.74 0.83 0.65 0.46 0.33 0.55 0.18 Avail Cap(c_a), veh/h 281 1617 720 449 895 929 393 1906 845 281 2573 792 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.2 19.1 18.8 27.2 18.3 18.3 27.2 18.4 17.1 28.6 20.1 18.1 Incr Delay (d2), s/veh 1.1 0.4 0.7 3.4 1.9 1.8 14.1 0.6 0.7 1.1 0.3 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.7 2.1 1.8 5.2 5.4 2.8 3.8 2.4 0.4 2.6 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.4 19.5 19.5 30.6 20.2 20.1 41.2 19.0 17.7 29.6 20.4 18.3 LnGrp LOS C B B C C C D B B C C B
Approach Vol, veh/h 720 1168 1306 864
Approach Delay, s/veh 20.0 22.4 24.3 20.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 23.8 10.3 21.1 11.0 20.1 6.4 25.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.0 13.1 6.3 9.1 7.7 9.6 2.6 15.8 Green Ext Time (p_c), s 0.0 5.1 0.1 3.5 0.0 4.5 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 22.3
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 149 638 154 216 896 109 402 1055 243 187 868 139 Future Volume (veh/h) 149 638 154 216 896 109 402 1055 243 187 868 139 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 157 672 162 227 943 115 423 1111 256 197 914 146 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 241 1453 443 325 1578 476 514 1717 533 290 1386 430 Arrive On Green 0.07 0.28 0.28 0.09 0.30 0.30 0.15 0.33 0.33 0.08 0.27 0.27 Sat Flow, veh/h 3510 5187 1583 3510 5187 1564 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 157 672 162 227 943 115 423 1111 256 197 914 146 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1755 1729 1564 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 3.3 8.0 6.1 4.7 11.6 4.1 8.8 13.7 9.5 4.1 11.7 5.5 Cycle Q Clear(g_c), s 3.3 8.0 6.1 4.7 11.6 4.1 8.8 13.7 9.5 4.1 11.7 5.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 241 1453 443 325 1578 476 514 1717 533 290 1386 430 V/C Ratio(X) 0.65 0.46 0.37 0.70 0.60 0.24 0.82 0.65 0.48 0.68 0.66 0.34 Avail Cap(c_a), veh/h 328 2147 655 328 2147 647 563 2493 773 469 2355 730 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.0 22.3 21.6 33.0 22.2 19.6 31.0 21.3 19.9 33.4 24.4 22.1 Incr Delay (d2), s/veh 3.0 0.2 0.5 6.3 0.4 0.3 8.9 0.4 0.7 2.8 0.5 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 3.0 2.1 2.1 4.2 1.4 3.9 4.7 3.2 1.7 4.2 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.0 22.5 22.1 39.3 22.5 19.8 39.9 21.7 20.6 36.2 25.0 22.6 LnGrp LOS D C C D C B D C C D C C
Approach Vol, veh/h 991 1285 1790 1257
Approach Delay, s/veh 24.7 25.2 25.9 26.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.2 28.8 10.9 25.0 15.0 24.0 9.1 26.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 36.0 7.0 31.0 12.0 34.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 6.1 15.7 6.7 10.0 10.8 13.7 5.3 13.6 Green Ext Time (p_c), s 0.2 7.8 0.0 4.7 0.2 6.0 0.1 5.9 Intersection Summary
HCM 7th Control Delay, s/veh 25.6
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/28/2025 Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 63 215 275 120 80 248 1433 201 24 1218 30 Future Volume (veh/h) 69 63 215 275 120 80 248 1433 201 24 1218 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 70 64 219 281 122 82 253 1462 205 24 1282 30 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.95 1.00 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 91 342 282 319 581 483 292 1963 275 46 1512 468 Arrive On Green 0.05 0.18 0.18 0.18 0.31 0.31 0.16 0.43 0.43 0.03 0.29 0.29 Sat Flow, veh/h 1810 1900 1570 1810 1900 1579 1810 4596 644 1810 5187 1605 Grp Volume(v), veh/h 70 64 219 281 122 82 253 1100 567 24 1282 30 Grp Sat Flow(s),veh/h/ln 1810 1900 1570 1810 1900 1579 1810 1729 1782 1810 1729 1605 Q Serve(g_s), s 3.2 2.4 11.1 12.7 4.0 3.2 11.4 22.4 22.4 1.1 19.5 1.1 Cycle Q Clear(g_c), s 3.2 2.4 11.1 12.7 4.0 3.2 11.4 22.4 22.4 1.1 19.5 1.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.36 1.00 1.00
Lane Grp Cap(c), veh/h 91 342 282 319 581 483 292 1477 761 46 1512 468 V/C Ratio(X) 0.77 0.19 0.78 0.88 0.21 0.17 0.87 0.74 0.75 0.52 0.85 0.06 Avail Cap(c_a), veh/h 195 499 413 346 658 547 324 1487 767 108 1611 498 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.3 29.1 32.7 33.6 21.5 21.3 34.2 20.1 20.2 40.3 27.9 21.4 Incr Delay (d2), s/veh 12.7 0.3 5.5 21.0 0.2 0.2 19.9 2.1 4.0 8.7 4.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 1.1 4.4 7.1 1.7 1.1 6.2 7.9 8.6 0.6 7.7 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 52.0 29.4 38.2 54.6 21.7 21.4 54.1 22.2 24.1 49.0 32.2 21.5 LnGrp LOS D C D D C C D C C D C C
Approach Vol, veh/h 353 485 1920 1336
Approach Delay, s/veh 39.4 40.7 27.0 32.2
Approach LOS D D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 39.7 18.8 19.0 17.5 28.4 8.2 29.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 36.0 16.0 22.0 15.0 26.0 9.0 29.0 Max Q Clear Time (g_c+I1), s 3.1 24.4 14.7 13.1 13.4 21.5 5.2 6.0 Green Ext Time (p_c), s 0.0 7.3 0.1 0.7 0.1 2.9 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 31.4
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 50 19 88 137 33 107 89 1724 98 84 1625 44 Future Volume (veh/h) 50 19 88 137 33 107 89 1724 98 84 1625 44 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 53 20 93 144 35 113 94 1815 103 88 1711 46 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 90 36 167 277 287 240 123 2341 724 119 2331 706 Arrive On Green 0.05 0.12 0.12 0.08 0.15 0.15 0.07 0.45 0.45 0.07 0.45 0.45 Sat Flow, veh/h 1810 293 1362 3510 1900 1588 1810 5187 1605 1810 5187 1571 Grp Volume(v), veh/h 53 0 113 144 35 113 94 1815 103 88 1711 46 Grp Sat Flow(s),veh/h/ln 1810 0 1655 1755 1900 1588 1810 1729 1605 1810 1729 1571 Q Serve(g_s), s 1.6 0.0 3.7 2.2 0.9 3.7 2.9 16.8 2.1 2.7 15.4 0.9 Cycle Q Clear(g_c), s 1.6 0.0 3.7 2.2 0.9 3.7 2.9 16.8 2.1 2.7 15.4 0.9 Prop In Lane 1.00 0.82 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 90 0 202 277 287 240 123 2341 724 119 2331 706 V/C Ratio(X) 0.59 0.00 0.56 0.52 0.12 0.47 0.76 0.78 0.14 0.74 0.73 0.07 Avail Cap(c_a), veh/h 159 0 757 309 869 726 159 2554 790 159 2554 774 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.4 0.0 23.5 25.2 20.9 22.0 26.0 13.2 9.1 26.1 12.9 8.9 Incr Delay (d2), s/veh 5.9 0.0 2.4 1.5 0.2 1.4 14.9 1.4 0.1 11.5 1.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 1.4 0.9 0.4 1.3 1.6 4.6 0.6 1.4 4.2 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.4 0.0 25.9 26.7 21.0 23.5 40.9 14.6 9.2 37.5 13.9 8.9 LnGrp LOS C C C C C D B A D B A
Approach Vol, veh/h 166 292 2012 1845
Approach Delay, s/veh 28.0 24.8 15.5 14.9
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.8 29.7 8.5 11.0 7.9 29.6 6.8 12.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 28.0 5.0 26.0 5.0 28.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.7 18.8 4.2 5.7 4.9 17.4 3.6 5.7 Green Ext Time (p_c), s 0.0 6.9 0.0 0.5 0.0 7.3 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 16.4
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 284 0 151 0 0 0 298 1726 0 0 1570 285 Future Volume (veh/h) 284 0 151 0 0 0 298 1726 0 0 1570 285 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 299 0 159 0 0 0 314 1817 0 0 1653 300 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 865 0 264 0 312 0 372 3501 0 0 2016 626
Arrive On Green 0.16 0.00 0.16 0.00 0.00 0.00 0.21 0.67 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 299 0 159 0 0 0 314 1817 0 0 1653 300 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.9 0.0 4.6 0.0 0.0 0.0 8.3 8.7 0.0 0.0 14.2 7.0 Cycle Q Clear(g_c), s 3.9 0.0 4.6 0.0 0.0 0.0 8.3 8.7 0.0 0.0 14.2 7.0 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 865 0 264 0 312 0 372 3501 0 0 2016 626 V/C Ratio(X) 0.35 0.00 0.60 0.00 0.00 0.00 0.84 0.52 0.00 0.00 0.82 0.48 Avail Cap(c_a), veh/h 1845 0 713 0 842 0 401 3655 0 0 2088 648 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 19.0 0.0 19.3 0.0 0.0 0.0 19.0 4.0 0.0 0.0 13.6 11.4 Incr Delay (d2), s/veh 0.2 0.0 2.2 0.0 0.0 0.0 14.3 0.1 0.0 0.0 2.6 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 1.5 0.0 0.0 0.0 4.1 0.5 0.0 0.0 4.1 1.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.2 0.0 21.5 0.0 0.0 0.0 33.2 4.2 0.0 0.0 16.3 12.0 LnGrp LOS B C C A B B
Approach Vol, veh/h 458 0 2131 1953
Approach Delay, s/veh 20.0 0.0 8.4 15.6
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 37.5 12.1 14.2 23.3 12.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 11.0 20.0 22.0
Max Q Clear Time (g_c+I1), s 10.7 6.6 10.3 16.2 0.0
Green Ext Time (p_c), s 13.5 1.6 0.1 3.1 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 12.7
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Jet Way 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (veh/h) 96 73 2149 112 13 2089
Future Volume (veh/h) 96 73 2149 112 13 2089
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 101 77 2262 118 14 2199
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 176 157 3090 959 45 3670
Arrive On Green 0.10 0.10 0.60 0.60 0.02 0.71
Sat Flow, veh/h 1810 1610 5358 1610 1810 5358
Grp Volume(v), veh/h 101 77 2262 118 14 2199
Grp Sat Flow(s),veh/h/ln 1810 1610 1729 1610 1810 1729
Q Serve(g_s), s 2.5 2.1 14.4 1.5 0.4 9.9
Cycle Q Clear(g_c), s 2.5 2.1 14.4 1.5 0.4 9.9
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 176 157 3090 959 45 3670
V/C Ratio(X) 0.57 0.49 0.73 0.12 0.31 0.60
Avail Cap(c_a), veh/h 981 873 3375 1048 275 4612
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 19.9 19.7 6.7 4.1 22.1 3.4
Incr Delay (d2), s/veh 2.9 2.4 0.8 0.1 3.8 0.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 0.8 1.8 0.3 0.2 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.8 22.1 7.4 4.1 25.9 3.6
LnGrp LOS C C A A C A
Approach Vol, veh/h 178 2380 2213
Approach Delay, s/veh 22.5 7.3 3.7
Approach LOS C A A
Timer - Assigned Phs 1 2 6 8
Phs Duration (G+Y+Rc), s 5.1 31.5 36.6 9.5
Change Period (Y+Rc), s 4.0 4.0 4.0 5.0
Max Green Setting (Gmax), s 7.0 30.0 41.0 25.0
Max Q Clear Time (g_c+I1), s 2.4 16.4 11.9 4.5
Green Ext Time (p_c), s 0.0 11.1 18.9 0.5
Intersection Summary
HCM 7th Control Delay, s/veh 6.2
HCM 7th LOS A
h 7 1 7 " 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 304 205 0 2136 2016 786
Future Volume (veh/h) 304 205 0 2136 2016 786
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 355 179 0 2248 2122 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 610 271 0 3442 3442
Arrive On Green 0.17 0.17 0.00 0.66 0.66 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 355 179 0 2248 2122 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 4.3 5.0 0.0 12.3 11.1 0.0
Cycle Q Clear(g_c), s 4.3 5.0 0.0 12.3 11.1 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 610 271 0 3442 3442
V/C Ratio(X) 0.58 0.66 0.00 0.65 0.62
Avail Cap(c_a), veh/h 987 439 0 4246 4246
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 18.3 18.5 0.0 4.8 4.6 0.0
Incr Delay (d2), s/veh 0.9 2.7 0.0 0.3 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.7 1.8 0.0 0.7 0.6 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.2 21.3 0.0 5.0 4.7 0.0
LnGrp LOS B C A A
Approach Vol, veh/h 534 2248 2122
Approach Delay, s/veh 19.9 5.0 4.7
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 35.6 12.0 35.6
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 39.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 14.3 7.0 13.1
Green Ext Time (p_c), s 17.4 1.1 16.8
Intersection Summary
HCM 7th Control Delay, s/veh 6.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 921 0 483 0 1664 379 380 1734 0 Future Volume (veh/h) 0 0 0 921 0 483 0 1664 379 380 1734 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 969 0 508 0 1752 399 400 1825 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 2 0 1094 0 973 0 2069 1121 488 3066 0
Arrive On Green 0.00 0.00 0.00 0.30 0.00 0.30 0.00 0.40 0.40 0.14 0.59 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 969 0 508 0 1752 399 400 1825 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 19.1 0.0 9.8 0.0 23.0 7.5 8.3 16.6 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 19.1 0.0 9.8 0.0 23.0 7.5 8.3 16.6 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 2 0 1094 0 973 0 2069 1121 488 3066 0 V/C Ratio(X) 0.00 0.00 0.00 0.89 0.00 0.52 0.00 0.85 0.36 0.82 0.60 0.00 Avail Cap(c_a), veh/h 0 175 0 1207 0 1546 0 2145 1144 515 3182 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 24.9 0.0 21.7 0.0 20.5 4.5 31.4 9.7 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 7.7 0.0 0.4 0.0 3.3 0.2 9.8 0.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 8.4 0.0 3.4 0.0 8.1 1.5 3.8 4.3 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 32.6 0.0 22.1 0.0 23.7 4.7 41.1 10.0 0.0 LnGrp LOS C C C A D A
Approach Vol, veh/h 0 1477 2151 2225
Approach Delay, s/veh 0.0 29.0 20.2 15.6
Approach LOS C C B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 14.4 33.9 26.7 0.0 48.3 26.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 11.0 31.0 25.0 7.0 46.0 36.0 Max Q Clear Time (g_c+I1), s 10.3 25.0 21.1 0.0 18.6 11.8 Green Ext Time (p_c), s 0.1 4.9 1.5 0.0 14.5 2.0
Intersection Summary
HCM 7th Control Delay, s/veh 20.7
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 315 535 154 305 678 378 158 1162 215 316 1758 307 Future Volume (veh/h) 315 535 154 305 678 378 158 1162 215 316 1758 307 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 332 563 162 321 714 398 166 1223 226 333 1851 323 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 365 1449 444 395 1493 457 231 1512 279 397 2029 630 Arrive On Green 0.10 0.28 0.28 0.11 0.29 0.29 0.07 0.34 0.34 0.11 0.39 0.39 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4399 813 3510 5187 1610 Grp Volume(v), veh/h 332 563 162 321 714 398 166 961 488 333 1851 323 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1754 1755 1729 1610 Q Serve(g_s), s 9.9 9.3 8.7 9.4 12.0 25.2 4.9 26.7 26.7 9.8 35.7 16.2 Cycle Q Clear(g_c), s 9.9 9.3 8.7 9.4 12.0 25.2 4.9 26.7 26.7 9.8 35.7 16.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.46 1.00 1.00
Lane Grp Cap(c), veh/h 365 1449 444 395 1493 457 231 1188 603 397 2029 630 V/C Ratio(X) 0.91 0.39 0.36 0.81 0.48 0.87 0.72 0.81 0.81 0.84 0.91 0.51 Avail Cap(c_a), veh/h 365 1449 444 531 1667 511 232 1188 603 431 2060 639 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.9 30.8 30.6 45.8 31.1 35.8 48.5 31.6 31.6 45.9 30.5 24.5 Incr Delay (d2), s/veh 25.9 0.2 0.5 6.9 0.2 14.0 10.3 4.3 8.1 12.8 6.6 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.5 3.7 3.2 4.4 4.8 11.0 2.4 10.9 11.7 4.8 14.5 5.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 72.8 31.0 31.1 52.8 31.3 49.8 58.7 35.8 39.7 58.7 37.1 25.2 LnGrp LOS E C C D C D E D D E D C
Approach Vol, veh/h 1057 1433 1615 2507
Approach Delay, s/veh 44.1 41.3 39.3 38.5
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 16.0 40.3 15.9 33.5 10.9 45.4 15.0 34.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 13.0 36.0 16.0 29.0 7.0 42.0 11.0 34.0 Max Q Clear Time (g_c+I1), s 11.8 28.7 11.4 11.3 6.9 37.7 11.9 27.2 Green Ext Time (p_c), s 0.1 4.6 0.5 3.8 0.0 3.6 0.0 3.3 Intersection Summary
HCM 7th Control Delay, s/veh 40.2
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 0 170 0 0 0 226 1266 0 0 1143 147 Future Volume (veh/h) 146 0 170 0 0 0 226 1266 0 0 1143 147 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 154 0 179 0 0 0 238 1333 0 0 1203 155 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 523 0 0 0 5 0 428 3310 0 0 2125 651
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.64 0.00 0.00 0.41 0.41 Sat Flow, veh/h 3510 154 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 154 14.5 0 0 0 238 1333 0 0 1203 155 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.5 0.0 0.0 0.0 2.4 4.7 0.0 0.0 6.7 2.4 Cycle Q Clear(g_c), s 1.5 0.0 0.0 0.0 2.4 4.7 0.0 0.0 6.7 2.4 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 523 0 5 0 428 3310 0 0 2125 651
V/C Ratio(X) 0.29 0.00 0.00 0.00 0.56 0.40 0.00 0.00 0.57 0.24 Avail Cap(c_a), veh/h 2616 0 1467 0 467 4280 0 0 3037 930 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.2 0.0 0.0 0.0 15.5 3.3 0.0 0.0 8.5 7.3 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 1.2 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 0.0 0.0 0.0 0.8 0.0 0.0 0.0 1.3 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.5 0.0 0.0 0.0 16.7 3.4 0.0 0.0 8.8 7.4 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1571 1358
Approach Delay, s/veh 0.0 5.4 8.6
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 28.0 8.6 19.4 9.6 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.7 4.4 8.7 3.5 0.0
Green Ext Time (p_c), s 9.5 0.0 6.6 0.5 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.3
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 173 642 158 264 1007 417 173 932 237 310 826 123 Future Volume (veh/h) 173 642 158 264 1007 417 173 932 237 310 826 123 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 182 676 166 278 1060 439 182 981 249 326 869 129 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 263 1670 508 357 1810 551 263 1425 436 407 1638 501 Arrive On Green 0.07 0.32 0.32 0.10 0.35 0.35 0.07 0.27 0.27 0.12 0.32 0.32 Sat Flow, veh/h 3510 5187 1578 3510 5187 1580 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 182 676 166 278 1060 439 182 981 249 326 869 129 Grp Sat Flow(s),veh/h/ln 1755 1729 1578 1755 1729 1580 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 4.4 8.8 6.9 6.7 14.4 21.6 4.4 14.6 11.7 7.8 11.9 5.2 Cycle Q Clear(g_c), s 4.4 8.8 6.9 6.7 14.4 21.6 4.4 14.6 11.7 7.8 11.9 5.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 263 1670 508 357 1810 551 263 1425 436 407 1638 501 V/C Ratio(X) 0.69 0.40 0.33 0.78 0.59 0.80 0.69 0.69 0.57 0.80 0.53 0.26 Avail Cap(c_a), veh/h 407 2044 622 407 2044 623 407 2044 625 448 2105 644 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.9 22.8 22.2 37.8 23.0 25.3 38.9 28.0 26.9 37.2 24.3 22.0 Incr Delay (d2), s/veh 3.3 0.2 0.4 8.2 0.3 6.4 3.3 0.6 1.2 9.3 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 3.3 2.4 3.1 5.4 8.3 1.9 5.6 4.2 3.6 4.4 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.2 23.0 22.5 46.0 23.3 31.7 42.2 28.6 28.1 46.5 24.5 22.2 LnGrp LOS D C C D C C D C C D C C
Approach Vol, veh/h 1024 1777 1412 1324
Approach Delay, s/veh 26.3 28.9 30.2 29.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 27.7 12.8 31.8 10.5 31.2 10.5 34.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 34.0 10.0 34.0 10.0 35.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 9.8 16.6 8.7 10.8 6.4 13.9 6.4 23.6 Green Ext Time (p_c), s 0.1 6.6 0.1 4.9 0.2 5.9 0.2 5.9 Intersection Summary
HCM 7th Control Delay, s/veh 29.0
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Buildout Year 2046 Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 39 78 203 85 125 50 177 1304 86 31 1143 63 Future Volume (veh/h) 39 78 203 85 125 50 177 1304 86 31 1143 63 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 41 82 214 89 132 53 186 1373 91 33 1203 66 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 73 335 284 115 378 316 230 2297 698 63 1819 552 Arrive On Green 0.04 0.18 0.18 0.06 0.20 0.20 0.13 0.44 0.44 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 41 82 214 89 132 53 186 1373 91 33 1203 66 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.4 2.4 8.0 3.1 3.8 1.8 6.4 12.8 2.2 1.1 12.5 1.8 Cycle Q Clear(g_c), s 1.4 2.4 8.0 3.1 3.8 1.8 6.4 12.8 2.2 1.1 12.5 1.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 73 335 284 115 378 316 230 2297 698 63 1819 552 V/C Ratio(X) 0.56 0.24 0.75 0.78 0.35 0.17 0.81 0.60 0.13 0.53 0.66 0.12 Avail Cap(c_a), veh/h 171 1164 987 142 1134 948 256 3015 916 171 2771 841 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 30.0 22.6 24.9 29.4 21.9 21.1 27.0 13.4 10.5 30.2 17.5 14.0 Incr Delay (d2), s/veh 6.5 0.4 4.1 19.0 0.6 0.2 16.0 0.3 0.1 6.6 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 1.0 3.2 1.9 1.7 0.6 3.4 3.8 0.7 0.6 4.1 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.5 22.9 29.0 48.4 22.5 21.4 43.1 13.7 10.6 36.8 17.9 14.1 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 337 274 1650 1302
Approach Delay, s/veh 28.4 30.7 16.8 18.2
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 32.2 8.0 17.2 12.1 26.3 6.6 18.7 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.1 14.8 5.1 10.0 8.4 14.5 3.4 5.8 Green Ext Time (p_c), s 0.0 9.8 0.0 1.2 0.0 7.8 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 19.5
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
Appendix H. Buildout Year 2046 With Project Phases
I-II Peak Hour Analysis Worksheets
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 37 1155 32 2 829 40 9 4 0 34 13 35 Future Volume (veh/h) 37 1155 32 2 829 40 9 4 0 34 13 35 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 40 1255 35 2 901 43 10 4 0 37 14 38 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 84 2132 59 6 1860 89 399 130 0 250 109 151
Arrive On Green 0.05 0.41 0.41 0.00 0.37 0.37 0.22 0.22 0.00 0.22 0.22 0.22 Sat Flow, veh/h 1810 5187 145 1810 5066 241 965 600 0 430 507 698 Grp Volume(v), veh/h 40 837 453 2 614 330 14 0 0 89 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1874 1810 1729 1849 1565 0 0 1635 0 0 Q Serve(g_s), s 0.7 6.1 6.1 0.0 4.4 4.4 0.0 0.0 0.0 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.7 6.1 6.1 0.0 4.4 4.4 0.2 0.0 0.0 1.3 0.0 0.0 Prop In Lane 1.00 0.08 1.00 0.13 0.71 0.00 0.42 0.43
Lane Grp Cap(c), veh/h 84 1421 770 6 1269 679 529 0 0 510 0 0 V/C Ratio(X) 0.47 0.59 0.59 0.36 0.48 0.49 0.03 0.00 0.00 0.17 0.00 0.00 Avail Cap(c_a), veh/h 279 1921 1041 279 1921 1027 1357 0 0 1381 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 15.1 7.4 7.4 16.1 7.9 7.9 10.0 0.0 0.0 10.5 0.0 0.0 Incr Delay (d2), s/veh 4.1 0.4 0.7 34.7 0.3 0.5 0.0 0.0 0.0 0.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.9 1.0 0.1 0.8 0.9 0.1 0.0 0.0 0.4 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.1 7.8 8.1 50.8 8.2 8.4 10.1 0.0 0.0 10.6 0.0 0.0 LnGrp LOS B A A D A A B B
Approach Vol, veh/h 1330 946 14 89
Approach Delay, s/veh 8.3 8.4 10.1 10.6
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 17.3 11.0 5.5 15.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.2 2.0 8.1 3.3 2.7 6.4
Green Ext Time (p_c), s 0.0 0.0 5.2 0.4 0.0 4.2
Intersection Summary
HCM 7th Control Delay, s/veh 8.4
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 251 705 430 154 636 161 310 1523 283 198 1384 169 Future Volume (veh/h) 251 705 430 154 636 161 310 1523 283 198 1384 169 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 256 719 439 157 649 164 316 1554 289 202 1412 172 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 275 1600 490 206 1499 570 309 1792 650 240 1691 650 Arrive On Green 0.08 0.33 0.33 0.06 0.31 0.31 0.09 0.37 0.37 0.07 0.35 0.35 Sat Flow, veh/h 3291 4863 1491 3291 4863 1490 3291 4863 1508 3291 4863 1508 Grp Volume(v), veh/h 256 719 439 157 649 164 316 1554 289 202 1412 172 Grp Sat Flow(s),veh/h/ln 1646 1621 1491 1646 1621 1490 1646 1621 1508 1646 1621 1508 Q Serve(g_s), s 7.4 11.2 26.9 4.5 10.2 7.3 9.0 28.4 12.9 5.8 25.6 7.0 Cycle Q Clear(g_c), s 7.4 11.2 26.9 4.5 10.2 7.3 9.0 28.4 12.9 5.8 25.6 7.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 275 1600 490 206 1499 570 309 1792 650 240 1691 650 V/C Ratio(X) 0.93 0.45 0.90 0.76 0.43 0.29 1.02 0.87 0.44 0.84 0.84 0.26 Avail Cap(c_a), veh/h 275 1725 529 206 1623 608 309 1877 677 240 1775 677 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.7 25.3 30.6 44.2 26.5 20.6 43.4 28.1 19.2 43.9 28.7 17.5 Incr Delay (d2), s/veh 36.6 0.2 16.9 15.4 0.2 0.3 57.1 4.5 0.5 22.5 3.5 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.3 4.0 11.1 2.2 3.7 2.4 5.9 10.5 4.1 3.0 9.4 2.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 80.3 25.5 47.5 59.6 26.7 20.9 100.6 32.6 19.7 66.4 32.2 17.7 LnGrp LOS F C D E C C F C B E C B
Approach Vol, veh/h 1414 970 2159 1786
Approach Delay, s/veh 42.3 31.0 40.8 34.7
Approach LOS D C D C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.0 39.3 10.0 35.5 13.0 37.3 12.0 33.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 37.0 6.0 34.0 9.0 35.0 8.0 32.0 Max Q Clear Time (g_c+I1), s 7.8 30.4 6.5 28.9 11.0 27.6 9.4 12.2 Green Ext Time (p_c), s 0.0 4.9 0.0 2.7 0.0 4.9 0.0 4.4 Intersection Summary
HCM 7th Control Delay, s/veh 37.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Project Dwy D/NW Promenade & Rosedale Highway 12/28/2025 Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 1333 72 87 807 63 99 6 38 88 7 51 Future Volume (veh/h) 69 1333 72 87 807 63 99 6 38 88 7 51 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1900 1870 1870 1870 1900 1870 1900 Adj Flow Rate, veh/h 70 1360 73 89 823 64 101 6 39 95 0 52 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 2 2 0 0 2 2 2 0 2 0
Cap, veh/h 213 1900 580 123 1942 602 158 9 61 477 0 212 Arrive On Green 0.06 0.37 0.37 0.07 0.37 0.37 0.13 0.13 0.13 0.13 0.00 0.13 Sat Flow, veh/h 3510 5187 1583 1781 5187 1609 1195 71 461 3619 0 1610 Grp Volume(v), veh/h 70 1360 73 89 823 64 146 0 0 95 0 52 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1781 1729 1609 1728 0 0 1810 0 1610 Q Serve(g_s), s 1.0 12.0 1.6 2.6 6.3 1.4 4.3 0.0 0.0 1.2 0.0 1.5 Cycle Q Clear(g_c), s 1.0 12.0 1.6 2.6 6.3 1.4 4.3 0.0 0.0 1.2 0.0 1.5 Prop In Lane 1.00 1.00 1.00 1.00 0.69 0.27 1.00 1.00
Lane Grp Cap(c), veh/h 213 1900 580 123 1942 602 228 0 0 477 0 212 V/C Ratio(X) 0.33 0.72 0.13 0.73 0.42 0.11 0.64 0.00 0.00 0.20 0.00 0.25 Avail Cap(c_a), veh/h 331 2246 686 168 2246 697 586 0 0 1227 0 546 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 23.9 14.5 11.2 24.2 12.3 10.8 21.9 0.0 0.0 20.6 0.0 20.7 Incr Delay (d2), s/veh 0.9 0.9 0.1 9.5 0.1 0.1 3.0 0.0 0.0 0.2 0.0 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 3.6 0.4 1.3 1.8 0.4 1.8 0.0 0.0 0.5 0.0 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.8 15.4 11.3 33.8 12.5 10.9 24.9 0.0 0.0 20.8 0.0 21.3 LnGrp LOS C B B C B B C C C
Approach Vol, veh/h 1503 976 146 147
Approach Delay, s/veh 15.6 14.3 24.9 20.9
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 7.7 23.5 11.0 7.2 23.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 18.0 5.0 23.0 18.0 5.0 23.0 Max Q Clear Time (g_c+I1), s 6.3 4.6 14.0 3.5 3.0 8.3
Green Ext Time (p_c), s 0.5 0.0 5.5 0.4 0.0 4.6
Intersection Summary
HCM 7th Control Delay, s/veh 15.9
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. " +++ 7 h 1 7 4 h 4 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 119 1203 104 20 804 86 89 53 70 216 59 113 Future Volume (veh/h) 119 1203 104 20 804 86 89 53 70 216 59 113 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 129 1308 113 22 874 93 97 58 76 235 64 123 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 294 2082 646 48 1783 554 261 511 226 377 630 276 Arrive On Green 0.08 0.40 0.40 0.03 0.34 0.34 0.07 0.14 0.14 0.11 0.17 0.17 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1600 3510 3610 1579 Grp Volume(v), veh/h 129 1308 113 22 874 93 97 58 76 235 64 123 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1600 1755 1805 1579 Q Serve(g_s), s 1.7 10.0 2.2 0.6 6.6 2.0 1.3 0.7 2.1 3.2 0.7 3.5 Cycle Q Clear(g_c), s 1.7 10.0 2.2 0.6 6.6 2.0 1.3 0.7 2.1 3.2 0.7 3.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 294 2082 646 48 1783 554 261 511 226 377 630 276 V/C Ratio(X) 0.44 0.63 0.17 0.46 0.49 0.17 0.37 0.11 0.34 0.62 0.10 0.45 Avail Cap(c_a), veh/h 497 2935 911 183 2725 846 355 2189 970 780 2626 1148 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.6 11.9 9.5 23.7 12.8 11.3 21.8 18.5 19.1 21.1 17.2 18.3 Incr Delay (d2), s/veh 1.0 0.3 0.1 6.8 0.2 0.1 0.9 0.1 0.9 1.7 0.1 1.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.7 0.6 0.3 1.9 0.5 0.5 0.3 0.7 1.2 0.3 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.6 12.2 9.7 30.5 13.0 11.4 22.7 18.6 20.0 22.8 17.2 19.4 LnGrp LOS C B A C B B C B C C B B
Approach Vol, veh/h 1550 989 231 422
Approach Delay, s/veh 12.9 13.3 20.8 21.0
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.3 11.0 5.3 23.9 7.7 12.6 8.2 21.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 30.0 5.0 28.0 5.0 36.0 7.0 26.0 Max Q Clear Time (g_c+I1), s 5.2 4.1 2.6 12.0 3.3 5.5 3.7 8.6 Green Ext Time (p_c), s 0.4 0.5 0.0 7.9 0.0 0.7 0.1 5.3 Intersection Summary
HCM 7th Control Delay, s/veh 14.6
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 119 525 181 359 768 124 272 704 268 116 1002 240 Future Volume (veh/h) 119 525 181 359 768 124 272 704 268 116 1002 240 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 129 571 197 390 835 135 296 765 291 126 1089 261 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 200 1049 325 338 1252 388 296 2065 641 198 1337 588 Arrive On Green 0.06 0.21 0.21 0.10 0.26 0.26 0.09 0.42 0.42 0.06 0.39 0.39 Sat Flow, veh/h 3319 4904 1518 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 129 571 197 390 835 135 296 765 291 126 1089 261 Grp Sat Flow(s),veh/h/ln 1659 1635 1518 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 3.0 8.1 9.2 8.0 12.0 5.7 7.0 8.4 10.8 2.9 22.4 10.1 Cycle Q Clear(g_c), s 3.0 8.1 9.2 8.0 12.0 5.7 7.0 8.4 10.8 2.9 22.4 10.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 200 1049 325 338 1252 388 296 2065 641 198 1337 588 V/C Ratio(X) 0.64 0.54 0.61 1.15 0.67 0.35 1.00 0.37 0.45 0.64 0.81 0.44 Avail Cap(c_a), veh/h 296 1997 618 338 2059 638 296 2246 697 338 1607 707 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.1 27.5 27.9 35.3 26.3 23.9 35.8 15.6 16.3 36.1 21.4 17.6 Incr Delay (d2), s/veh 3.4 0.4 1.8 97.8 0.6 0.5 52.7 0.1 0.5 3.4 2.8 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 2.9 3.2 7.6 4.3 1.9 4.8 2.7 3.3 1.2 8.1 3.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 39.5 27.9 29.7 133.1 26.9 24.5 88.5 15.7 16.8 39.5 24.2 18.1 LnGrp LOS D C C F C C F B B D C B
Approach Vol, veh/h 897 1360 1352 1476
Approach Delay, s/veh 30.0 57.1 31.9 24.4
Approach LOS C E C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.7 37.1 12.0 20.8 11.0 34.8 8.7 24.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 36.0 8.0 32.0 7.0 37.0 7.0 33.0 Max Q Clear Time (g_c+I1), s 4.9 10.4 10.0 11.2 9.0 24.4 5.0 14.0 Green Ext Time (p_c), s 0.1 3.4 0.0 4.0 0.0 6.3 0.1 5.5 Intersection Summary
HCM 7th Control Delay, s/veh 36.1
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 81 715 20 29 536 103 52 29 42 356 78 100 Future Volume (veh/h) 81 715 20 29 536 103 52 29 42 356 78 100 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 88 777 22 32 583 112 57 32 46 387 85 109 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 124 1366 421 64 830 367 97 281 237 451 653 552 Arrive On Green 0.07 0.26 0.26 0.04 0.23 0.23 0.05 0.15 0.15 0.25 0.34 0.34 Sat Flow, veh/h 1810 5187 1598 1810 3610 1596 1810 1900 1600 1810 1900 1606 Grp Volume(v), veh/h 88 777 22 32 583 112 57 32 46 387 85 109 Grp Sat Flow(s),veh/h/ln 1810 1729 1598 1810 1805 1596 1810 1900 1600 1810 1900 1606 Q Serve(g_s), s 2.5 6.8 0.5 0.9 7.8 3.1 1.6 0.8 1.3 10.7 1.6 2.5 Cycle Q Clear(g_c), s 2.5 6.8 0.5 0.9 7.8 3.1 1.6 0.8 1.3 10.7 1.6 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 124 1366 421 64 830 367 97 281 237 451 653 552 V/C Ratio(X) 0.71 0.57 0.05 0.50 0.70 0.31 0.59 0.11 0.19 0.86 0.13 0.20 Avail Cap(c_a), veh/h 172 1774 546 172 1235 546 206 902 760 550 1263 1068 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.0 16.8 14.5 24.9 18.6 16.8 24.3 19.4 19.7 18.9 11.9 12.2 Incr Delay (d2), s/veh 7.8 0.4 0.1 5.9 1.1 0.5 5.5 0.2 0.4 11.0 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.2 2.2 0.2 0.4 2.7 0.9 0.8 0.3 0.4 5.3 0.6 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 31.7 17.2 14.5 30.8 19.7 17.2 29.8 19.6 20.1 29.9 12.0 12.3 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 887 727 135 581
Approach Delay, s/veh 18.6 19.8 24.1 24.0
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 17.1 11.8 5.9 17.9 6.8 22.1 7.6 16.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 16.0 25.0 5.0 18.0 6.0 35.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 12.7 3.3 2.9 8.8 3.6 4.5 4.5 9.8 Green Ext Time (p_c), s 0.4 0.2 0.0 3.2 0.0 0.8 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.6
HCM 7th LOS C
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 36 687 338 80 488 17 206 30 149 37 64 25 Future Volume (veh/h) 36 687 338 80 488 17 206 30 149 37 64 25 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 39 747 367 87 530 18 224 33 162 40 70 27 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 76 1021 440 130 1127 498 282 510 432 78 297 247 Arrive On Green 0.04 0.28 0.28 0.07 0.31 0.31 0.16 0.27 0.27 0.04 0.16 0.16 Sat Flow, veh/h 1810 3610 1557 1810 3610 1595 1810 1900 1607 1810 1900 1583 Grp Volume(v), veh/h 39 747 367 87 530 18 224 33 162 40 70 27 Grp Sat Flow(s),veh/h/ln 1810 1805 1557 1810 1805 1595 1810 1900 1607 1810 1900 1583 Q Serve(g_s), s 1.0 9.0 10.6 2.2 5.7 0.4 5.7 0.6 3.9 1.0 1.5 0.7 Cycle Q Clear(g_c), s 1.0 9.0 10.6 2.2 5.7 0.4 5.7 0.6 3.9 1.0 1.5 0.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 76 1021 440 130 1127 498 282 510 432 78 297 247 V/C Ratio(X) 0.51 0.73 0.83 0.67 0.47 0.04 0.80 0.06 0.38 0.51 0.24 0.11 Avail Cap(c_a), veh/h 189 1431 617 189 1431 632 378 1189 1006 189 991 826 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.5 15.5 16.1 21.7 13.3 11.5 19.5 13.0 14.3 22.4 17.7 17.4 Incr Delay (d2), s/veh 5.2 1.2 6.8 5.9 0.3 0.0 8.3 0.1 0.5 5.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 2.9 3.6 1.0 1.7 0.1 2.7 0.2 1.1 0.5 0.6 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.6 16.7 23.0 27.6 13.6 11.5 27.8 13.1 14.8 27.6 18.1 17.6 LnGrp LOS C B C C B B C B B C B B
Approach Vol, veh/h 1153 635 419 137
Approach Delay, s/veh 19.1 15.5 21.6 20.8
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.1 16.9 7.4 17.6 11.5 11.5 6.0 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 30.0 5.0 19.0 10.0 25.0 5.0 19.0 Max Q Clear Time (g_c+I1), s 3.0 5.9 4.2 11.0 7.7 3.5 3.0 7.7 Green Ext Time (p_c), s 0.0 0.6 0.0 2.1 0.1 0.3 0.0 2.3 Intersection Summary
HCM 7th Control Delay, s/veh 18.6
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 329 0 620 599 580 624 306 1303 3 3 1651 230 Future Volume (veh/h) 329 0 620 599 580 624 306 1303 3 3 1651 230 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 358 0 674 716 539 678 333 1416 3 3 1795 250 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 534 0 474 968 508 861 292 2149 5 7 1675 520
Arrive On Green 0.15 0.00 0.15 0.28 0.28 0.28 0.09 0.42 0.42 0.00 0.33 0.33 Sat Flow, veh/h 3506 0 3114 3506 1841 3116 3401 5178 11 1753 5025 1559 Grp Volume(v), veh/h 358 0 674 716 539 678 333 916 503 3 1795 250 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1839 1753 1675 1559 Q Serve(g_s), s 10.1 0.0 16.0 19.5 29.0 21.1 9.0 23.1 23.1 0.2 35.0 13.4 Cycle Q Clear(g_c), s 10.1 0.0 16.0 19.5 29.0 21.1 9.0 23.1 23.1 0.2 35.0 13.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.01 1.00 1.00
Lane Grp Cap(c), veh/h 534 0 474 968 508 861 292 1390 763 7 1675 520 V/C Ratio(X) 0.67 0.00 1.42 0.74 1.06 0.79 1.14 0.66 0.66 0.43 1.07 0.48 Avail Cap(c_a), veh/h 534 0 474 968 508 861 292 1390 763 83 1675 520 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 42.0 0.0 44.5 34.6 38.0 35.2 48.0 24.7 24.7 52.2 35.0 27.8 Incr Delay (d2), s/veh 3.2 0.0 201.3 3.0 56.8 4.9 96.8 1.2 2.1 36.6 44.0 0.7 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 0.0 19.1 8.2 20.2 8.1 7.5 8.5 9.5 0.1 19.7 4.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 45.2 0.0 245.8 37.6 94.8 40.1 144.8 25.9 26.8 88.7 79.0 28.5 LnGrp LOS D F D F D F C C F F C
Approach Vol, veh/h 1032 1933 1752 2048
Approach Delay, s/veh 176.2 54.4 48.8 72.8
Approach LOS F D D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.4 47.6 20.0 13.0 39.0 33.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 39.0 16.0 9.0 35.0 29.0 Max Q Clear Time (g_c+I1), s 2.2 25.1 18.0 11.0 37.0 31.0 Green Ext Time (p_c), s 0.0 7.0 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 77.1
HCM 7th LOS E
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 894 34 52 655 76 134
Future Volume (veh/h) 894 34 52 655 76 134
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 972 37 57 712 83 146
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1497 57 110 2149 109 191
Arrive On Green 0.42 0.42 0.06 0.60 0.18 0.18
Sat Flow, veh/h 3640 135 1810 3705 606 1065
Grp Volume(v), veh/h 495 514 57 712 230 0
Grp Sat Flow(s),veh/h/ln 1805 1875 1810 1805 1678 0
Q Serve(g_s), s 7.8 7.8 1.1 3.5 4.6 0.0
Cycle Q Clear(g_c), s 7.8 7.8 1.1 3.5 4.6 0.0
Prop In Lane 0.07 1.00 0.36 0.63
Lane Grp Cap(c), veh/h 762 792 110 2149 301 0
V/C Ratio(X) 0.65 0.65 0.52 0.33 0.76 0.00
Avail Cap(c_a), veh/h 1322 1373 306 3660 756 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 8.2 8.2 16.2 3.6 13.9 0.0
Incr Delay (d2), s/veh 0.9 0.9 3.8 0.1 4.0 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.5 1.6 0.4 0.1 1.7 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 9.1 9.1 20.0 3.7 17.9 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 1009 769 230
Approach Delay, s/veh 9.1 4.9 17.9
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 10.4 6.2 19.0 25.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 16.0 6.0 26.0 36.0
Max Q Clear Time (g_c+I1), s 6.6 3.1 9.8 5.5
Green Ext Time (p_c), s 0.5 0.0 5.2 4.6
Intersection Summary
HCM 7th Control Delay, s/veh 8.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 198 409 336 164 367 253 254 987 154 264 1275 159 Future Volume (veh/h) 198 409 336 164 367 253 254 987 154 264 1275 159 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 215 445 365 178 399 275 276 1073 167 287 1386 173 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 305 944 728 245 882 391 368 1737 532 386 1765 547 Arrive On Green 0.09 0.26 0.26 0.07 0.24 0.24 0.10 0.33 0.33 0.11 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1602 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 215 445 365 178 399 275 276 1073 167 287 1386 173 Grp Sat Flow(s),veh/h/ln 1755 1805 1392 1755 1805 1602 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.3 7.4 8.0 3.6 6.7 11.2 5.5 12.4 5.6 5.7 17.2 5.7 Cycle Q Clear(g_c), s 4.3 7.4 8.0 3.6 6.7 11.2 5.5 12.4 5.6 5.7 17.2 5.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 305 944 728 245 882 391 368 1737 532 386 1765 547 V/C Ratio(X) 0.70 0.47 0.50 0.73 0.45 0.70 0.75 0.62 0.31 0.74 0.79 0.32 Avail Cap(c_a), veh/h 344 1717 1324 245 1616 717 393 1814 555 491 1959 607 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.7 22.2 22.4 32.6 23.0 24.6 31.1 19.9 17.7 30.8 21.2 17.4 Incr Delay (d2), s/veh 5.6 0.4 0.5 10.2 0.4 2.3 7.4 0.6 0.3 4.5 2.0 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 2.8 2.3 1.7 2.6 4.0 2.5 4.3 1.8 2.4 6.2 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.3 22.6 23.0 42.8 23.3 27.0 38.5 20.5 18.0 35.4 23.2 17.8 LnGrp LOS D C C D C C D C B D C B
Approach Vol, veh/h 1025 852 1516 1846
Approach Delay, s/veh 25.8 28.6 23.5 24.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 11.9 28.0 9.0 22.7 11.5 28.3 10.2 21.5 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 25.0 5.0 34.0 8.0 27.0 7.0 32.0 Max Q Clear Time (g_c+I1), s 7.7 14.4 5.6 10.0 7.5 19.2 6.3 13.2 Green Ext Time (p_c), s 0.2 5.2 0.0 4.1 0.1 5.1 0.1 3.0 Intersection Summary
HCM 7th Control Delay, s/veh 25.2
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 6 817 159 95 558 12 157 6 168 30 15 10 Future Volume (veh/h) 6 817 159 95 558 12 157 6 168 30 15 10 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 7 888 173 103 607 13 171 7 183 33 16 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 17 1232 532 133 1465 31 279 11 258 161 78 54 Arrive On Green 0.01 0.34 0.34 0.07 0.41 0.41 0.16 0.16 0.16 0.16 0.16 0.16 Sat Flow, veh/h 1810 3610 1559 1810 3611 77 1742 71 1607 985 478 328 Grp Volume(v), veh/h 7 888 173 103 303 317 178 0 183 60 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1559 1810 1805 1883 1813 0 1607 1791 0 0 Q Serve(g_s), s 0.2 13.2 5.0 3.4 7.3 7.4 5.6 0.0 6.6 1.8 0.0 0.0 Cycle Q Clear(g_c), s 0.2 13.2 5.0 3.4 7.3 7.4 5.6 0.0 6.6 1.8 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.04 0.96 1.00 0.55 0.18
Lane Grp Cap(c), veh/h 17 1232 532 133 733 764 291 0 258 293 0 0 V/C Ratio(X) 0.42 0.72 0.33 0.77 0.41 0.41 0.61 0.00 0.71 0.21 0.00 0.00 Avail Cap(c_a), veh/h 148 1651 713 207 885 923 563 0 499 293 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 30.2 17.6 14.9 27.9 13.0 13.0 23.9 0.0 24.4 22.2 0.0 0.0 Incr Delay (d2), s/veh 16.1 1.0 0.4 9.1 0.4 0.4 2.1 0.0 3.6 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 4.5 1.5 1.6 2.4 2.5 2.3 0.0 2.4 0.7 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 46.3 18.6 15.3 37.0 13.4 13.3 26.0 0.0 28.0 22.5 0.0 0.0 LnGrp LOS D B B D B B C C C
Approach Vol, veh/h 1068 723 361 60
Approach Delay, s/veh 18.3 16.7 27.0 22.5
Approach LOS B B C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 13.8 8.5 24.9 14.0 4.6 28.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 7.0 28.0 10.0 5.0 30.0 Max Q Clear Time (g_c+I1), s 8.6 5.4 15.2 3.8 2.2 9.4
Green Ext Time (p_c), s 1.1 0.0 5.0 0.1 0.0 3.2
Intersection Summary
HCM 7th Control Delay, s/veh 19.3
HCM 7th LOS B
Notes
User approved pedestrian interval to be less than phase max green. h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 67 489 214 321 284 58 141 95 275 87 181 16 Future Volume (veh/h) 67 489 214 321 284 58 141 95 275 87 181 16 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.92 1.00 0.91 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 73 532 233 349 309 63 153 103 299 95 197 17 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 95 725 323 438 986 440 233 762 593 138 702 61 Arrive On Green 0.05 0.20 0.20 0.12 0.27 0.27 0.07 0.40 0.40 0.08 0.41 0.41 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1479 1810 1709 147 Grp Volume(v), veh/h 73 532 233 349 309 63 153 103 299 95 0 214 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1479 1810 0 1856 Q Serve(g_s), s 3.2 11.2 11.0 7.8 5.5 2.4 3.4 2.8 12.3 4.2 0.0 6.2 Cycle Q Clear(g_c), s 3.2 11.2 11.0 7.8 5.5 2.4 3.4 2.8 12.3 4.2 0.0 6.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.08
Lane Grp Cap(c), veh/h 95 725 323 438 986 440 233 762 593 138 0 763 V/C Ratio(X) 0.77 0.73 0.72 0.80 0.31 0.14 0.66 0.14 0.50 0.69 0.00 0.28 Avail Cap(c_a), veh/h 201 1113 496 520 1247 556 346 797 620 179 0 778 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 37.9 30.4 30.3 34.5 23.4 22.3 37.0 15.4 18.2 36.5 0.0 15.9 Incr Delay (d2), s/veh 12.3 1.5 3.0 7.3 0.2 0.1 3.1 0.1 0.7 7.3 0.0 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 4.6 4.1 3.5 2.1 0.8 1.5 1.1 3.7 2.0 0.0 2.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 50.2 31.8 33.3 41.8 23.6 22.4 40.1 15.5 18.9 43.8 0.0 16.1 LnGrp LOS D C C D C C D B B D B
Approach Vol, veh/h 838 721 555 309
Approach Delay, s/veh 33.8 32.3 24.1 24.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.2 36.5 14.1 20.3 9.4 37.3 8.2 26.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 34.0 12.0 25.0 8.0 34.0 9.0 28.0 Max Q Clear Time (g_c+I1), s 6.2 14.3 9.8 13.2 5.4 8.2 5.2 7.5 Green Ext Time (p_c), s 0.0 1.5 0.3 3.1 0.1 1.1 0.0 1.8 Intersection Summary
HCM 7th Control Delay, s/veh 30.0
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 60 671 27 47 294 80 45 53 151 252 40 89 Future Volume (veh/h) 60 671 27 47 294 80 45 53 151 252 40 89 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 65 729 29 51 320 87 49 58 164 274 43 97 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 150 1096 486 128 1052 467 242 328 276 477 455 379 Arrive On Green 0.08 0.30 0.30 0.07 0.29 0.29 0.07 0.17 0.17 0.14 0.24 0.24 Sat Flow, veh/h 1810 3610 1602 1810 3610 1602 3510 1900 1602 3510 1900 1583 Grp Volume(v), veh/h 65 729 29 51 320 87 49 58 164 274 43 97 Grp Sat Flow(s),veh/h/ln 1810 1805 1602 1810 1805 1602 1755 1900 1602 1755 1900 1583 Q Serve(g_s), s 1.7 8.9 0.6 1.4 3.5 2.1 0.7 1.3 4.8 3.7 0.9 2.5 Cycle Q Clear(g_c), s 1.7 8.9 0.6 1.4 3.5 2.1 0.7 1.3 4.8 3.7 0.9 2.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 150 1096 486 128 1052 467 242 328 276 477 455 379 V/C Ratio(X) 0.43 0.67 0.06 0.40 0.30 0.19 0.20 0.18 0.59 0.57 0.09 0.26 Avail Cap(c_a), veh/h 287 1861 826 251 1790 794 487 1319 1112 766 1469 1225 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 22.0 15.3 12.5 22.4 13.9 13.4 22.2 17.8 19.2 20.4 14.9 15.5 Incr Delay (d2), s/veh 2.0 0.7 0.1 2.0 0.2 0.2 0.4 0.3 2.0 1.1 0.1 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 2.8 0.2 0.6 1.1 0.6 0.2 0.5 1.6 1.3 0.3 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 24.0 16.0 12.5 24.4 14.0 13.6 22.6 18.1 21.3 21.5 15.0 15.9 LnGrp LOS C B B C B B C B C C B B
Approach Vol, veh/h 823 458 271 414
Approach Delay, s/veh 16.5 15.1 20.8 19.5
Approach LOS B B C B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.8 12.7 7.6 19.3 7.5 16.1 8.2 18.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 35.0 7.0 26.0 7.0 39.0 8.0 25.0 Max Q Clear Time (g_c+I1), s 5.7 6.8 3.4 10.9 2.7 4.5 3.7 5.5 Green Ext Time (p_c), s 0.4 0.8 0.0 4.0 0.0 0.5 0.0 1.9 Intersection Summary
HCM 7th Control Delay, s/veh 17.4
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 25 381 402 159 189 110 212 897 211 174 1187 29 Future Volume (veh/h) 25 381 402 159 189 110 212 897 211 174 1187 29 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 27 414 437 173 205 120 230 975 229 189 1290 32 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 99 1141 508 253 1867 571 312 1831 561 216 1690 518 Arrive On Green 0.03 0.32 0.32 0.07 0.36 0.36 0.09 0.35 0.35 0.06 0.33 0.33 Sat Flow, veh/h 3510 3610 1609 3510 5187 1588 3510 5187 1588 3510 5187 1588 Grp Volume(v), veh/h 27 414 437 173 205 120 230 975 229 189 1290 32 Grp Sat Flow(s),veh/h/ln 1755 1805 1609 1755 1729 1588 1755 1729 1588 1755 1729 1588 Q Serve(g_s), s 0.6 7.2 20.7 3.9 2.1 4.2 5.2 12.1 8.8 4.3 18.1 1.1 Cycle Q Clear(g_c), s 0.6 7.2 20.7 3.9 2.1 4.2 5.2 12.1 8.8 4.3 18.1 1.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 99 1141 508 253 1867 571 312 1831 561 216 1690 518 V/C Ratio(X) 0.27 0.36 0.86 0.68 0.11 0.21 0.74 0.53 0.41 0.87 0.76 0.06 Avail Cap(c_a), veh/h 216 1424 635 303 2175 666 346 2239 686 216 2047 627 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.6 21.4 26.0 36.7 17.3 18.0 36.0 20.9 19.8 37.7 24.5 18.8 Incr Delay (d2), s/veh 1.5 0.2 9.6 4.9 0.0 0.2 7.2 0.2 0.5 30.1 1.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.8 8.3 1.7 0.8 1.4 2.4 4.4 3.0 2.6 6.8 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.1 21.6 35.7 41.6 17.3 18.2 43.3 21.1 20.3 67.8 25.9 18.9 LnGrp LOS D C D D B B D C C E C B
Approach Vol, veh/h 878 498 1434 1511
Approach Delay, s/veh 29.2 26.0 24.6 31.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.0 32.6 9.8 29.6 11.2 30.4 6.3 33.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 7.0 32.0 8.0 32.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 6.3 14.1 5.9 22.7 7.2 20.1 2.6 6.2 Green Ext Time (p_c), s 0.0 7.0 0.1 2.8 0.1 6.3 0.0 1.5 Intersection Summary
HCM 7th Control Delay, s/veh 27.9
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 42 1031 279 292 557 36 188 529 222 37 656 42 Future Volume (veh/h) 42 1031 279 292 557 36 188 529 222 37 656 42 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 46 1121 303 317 605 39 204 575 241 40 713 46 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 144 1288 573 404 1483 95 281 999 442 132 1215 374 Arrive On Green 0.04 0.36 0.36 0.12 0.43 0.43 0.08 0.28 0.28 0.04 0.23 0.23 Sat Flow, veh/h 3510 3610 1607 3510 3443 222 3510 3610 1598 3510 5187 1596 Grp Volume(v), veh/h 46 1121 303 317 317 327 204 575 241 40 713 46 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1860 1755 1805 1598 1755 1729 1596 Q Serve(g_s), s 1.0 21.7 11.2 6.6 9.1 9.1 4.2 10.3 9.6 0.8 9.1 1.7 Cycle Q Clear(g_c), s 1.0 21.7 11.2 6.6 9.1 9.1 4.2 10.3 9.6 0.8 9.1 1.7 Prop In Lane 1.00 1.00 1.00 0.12 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 144 1288 573 404 778 801 281 999 442 132 1215 374 V/C Ratio(X) 0.32 0.87 0.53 0.78 0.41 0.41 0.72 0.58 0.55 0.30 0.59 0.12 Avail Cap(c_a), veh/h 234 1350 601 422 778 801 281 1543 683 234 2148 661 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.9 22.5 19.1 32.2 14.7 14.7 33.6 23.3 23.1 35.1 25.4 22.6 Incr Delay (d2), s/veh 1.3 6.2 0.8 9.0 0.3 0.3 8.9 0.5 1.0 1.3 0.5 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 9.3 3.9 3.1 3.3 3.4 2.0 3.8 3.4 0.3 3.3 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.1 28.7 19.9 41.3 15.1 15.1 42.6 23.8 24.1 36.3 25.9 22.7 LnGrp LOS D C B D B B D C C D C C
Approach Vol, veh/h 1470 961 1020 799
Approach Delay, s/veh 27.1 23.7 27.6 26.2
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.8 24.7 12.6 30.7 10.0 21.5 7.1 36.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 32.0 9.0 28.0 6.0 31.0 5.0 32.0 Max Q Clear Time (g_c+I1), s 2.8 12.3 8.6 23.7 6.2 11.1 3.0 11.1 Green Ext Time (p_c), s 0.0 4.0 0.1 3.0 0.0 4.2 0.0 3.6 Intersection Summary
HCM 7th Control Delay, s/veh 26.3
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 174 1042 184 184 665 52 233 708 163 209 846 211 Future Volume (veh/h) 174 1042 184 184 665 52 233 708 163 209 846 211 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 189 1133 200 200 723 57 253 770 177 227 920 229 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 273 1749 535 281 1761 532 341 1440 446 321 1411 437 Arrive On Green 0.08 0.34 0.34 0.08 0.34 0.34 0.10 0.28 0.28 0.09 0.27 0.27 Sat Flow, veh/h 3510 5187 1587 3510 5187 1566 3510 5187 1608 3510 5187 1608 Grp Volume(v), veh/h 189 1133 200 200 723 57 253 770 177 227 920 229 Grp Sat Flow(s),veh/h/ln 1755 1729 1587 1755 1729 1566 1755 1729 1608 1755 1729 1608 Q Serve(g_s), s 3.9 13.9 7.2 4.2 8.0 1.9 5.3 9.4 6.7 4.7 11.8 9.1 Cycle Q Clear(g_c), s 3.9 13.9 7.2 4.2 8.0 1.9 5.3 9.4 6.7 4.7 11.8 9.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 273 1749 535 281 1761 532 341 1440 446 321 1411 437 V/C Ratio(X) 0.69 0.65 0.37 0.71 0.41 0.11 0.74 0.53 0.40 0.71 0.65 0.52 Avail Cap(c_a), veh/h 281 2147 657 281 2147 648 375 2216 687 469 2354 730 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.7 21.1 18.8 33.6 19.0 17.0 32.9 23.0 22.0 33.0 24.1 23.1 Incr Delay (d2), s/veh 6.9 0.5 0.4 8.1 0.2 0.1 7.0 0.3 0.6 2.8 0.5 1.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.8 5.0 2.3 1.9 2.8 0.6 2.3 3.4 2.3 1.9 4.2 3.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.6 21.5 19.3 41.7 19.1 17.0 39.9 23.3 22.5 35.9 24.6 24.1 LnGrp LOS D C B D B B D C C D C C
Approach Vol, veh/h 1522 980 1200 1376
Approach Delay, s/veh 23.6 23.6 26.7 26.4
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 24.8 10.0 29.3 11.3 24.4 9.8 29.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 32.0 6.0 31.0 8.0 34.0 6.0 31.0 Max Q Clear Time (g_c+I1), s 6.7 11.4 6.2 15.9 7.3 13.8 5.9 10.0 Green Ext Time (p_c), s 0.2 5.1 0.0 7.1 0.1 6.3 0.0 4.6 Intersection Summary
HCM 7th Control Delay, s/veh 25.1
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/27/2025 Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 43 86 311 184 103 61 200 1034 235 45 1109 18 Future Volume (veh/h) 43 86 311 184 103 61 200 1034 235 45 1109 18 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 45 91 327 194 108 64 211 1088 247 47 1167 19 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 76 472 391 234 638 531 234 1475 335 78 1363 421 Arrive On Green 0.04 0.25 0.25 0.13 0.34 0.34 0.13 0.35 0.35 0.04 0.26 0.26 Sat Flow, veh/h 1810 1900 1576 1810 1900 1580 1810 4224 958 1810 5187 1604 Grp Volume(v), veh/h 45 91 327 194 108 64 211 891 444 47 1167 19 Grp Sat Flow(s),veh/h/ln 1810 1900 1576 1810 1900 1580 1810 1729 1724 1810 1729 1604 Q Serve(g_s), s 1.7 2.6 13.7 7.3 2.8 1.9 8.0 15.7 15.7 1.8 14.9 0.6 Cycle Q Clear(g_c), s 1.7 2.6 13.7 7.3 2.8 1.9 8.0 15.7 15.7 1.8 14.9 0.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.56 1.00 1.00
Lane Grp Cap(c), veh/h 76 472 391 234 638 531 234 1208 602 78 1363 421 V/C Ratio(X) 0.60 0.19 0.84 0.83 0.17 0.12 0.90 0.74 0.74 0.61 0.86 0.05 Avail Cap(c_a), veh/h 130 601 499 234 711 591 234 1208 602 130 1418 438 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.7 20.6 24.8 29.5 16.3 16.0 29.8 19.8 19.8 32.7 24.4 19.1 Incr Delay (d2), s/veh 7.3 0.2 9.5 21.2 0.1 0.1 33.6 2.4 4.8 7.4 5.3 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.1 5.6 4.3 1.1 0.6 5.2 5.5 5.9 0.9 5.8 0.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.0 20.8 34.3 50.7 16.4 16.1 63.4 22.2 24.6 40.1 29.7 19.2 LnGrp LOS D C C D B B E C C D C B
Approach Vol, veh/h 463 366 1546 1233
Approach Delay, s/veh 32.2 34.5 28.5 29.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.0 28.3 13.0 21.3 13.0 22.3 6.9 27.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 23.0 9.0 22.0 9.0 19.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.8 17.7 9.3 15.7 10.0 16.9 3.7 4.8 Green Ext Time (p_c), s 0.0 3.3 0.0 0.9 0.0 1.4 0.0 0.6 Intersection Summary
HCM 7th Control Delay, s/veh 30.1
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 18 4 39 95 9 50 56 1456 129 63 1505 28 Future Volume (veh/h) 18 4 39 95 9 50 56 1456 129 63 1505 28 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 20 4 42 103 10 54 61 1583 140 68 1636 30 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 44 18 185 281 342 286 107 1969 609 115 1992 603 Arrive On Green 0.02 0.12 0.12 0.08 0.18 0.18 0.06 0.38 0.38 0.06 0.38 0.38 Sat Flow, veh/h 1810 142 1490 3510 1900 1589 1810 5187 1604 1810 5187 1570 Grp Volume(v), veh/h 20 0 46 103 10 54 61 1583 140 68 1636 30 Grp Sat Flow(s),veh/h/ln 1810 0 1632 1755 1900 1589 1810 1729 1604 1810 1729 1570 Q Serve(g_s), s 0.5 0.0 1.2 1.3 0.2 1.3 1.5 12.4 2.7 1.7 12.9 0.5 Cycle Q Clear(g_c), s 0.5 0.0 1.2 1.3 0.2 1.3 1.5 12.4 2.7 1.7 12.9 0.5 Prop In Lane 1.00 0.91 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 44 0 203 281 342 286 107 1969 609 115 1992 603 V/C Ratio(X) 0.45 0.00 0.23 0.37 0.03 0.19 0.57 0.80 0.23 0.59 0.82 0.05 Avail Cap(c_a), veh/h 199 0 935 387 1088 910 199 2057 636 199 2057 623 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 21.8 0.0 17.9 19.8 15.3 15.8 20.8 12.6 9.6 20.7 12.6 8.8 Incr Delay (d2), s/veh 7.0 0.0 0.6 0.8 0.0 0.3 4.7 2.3 0.2 4.8 2.7 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 0.4 0.5 0.1 0.4 0.6 3.3 0.7 0.7 3.5 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.8 0.0 18.5 20.6 15.4 16.1 25.5 14.9 9.8 25.5 15.3 8.8 LnGrp LOS C B C B B C B A C B A
Approach Vol, veh/h 66 167 1784 1734
Approach Delay, s/veh 21.6 18.8 14.9 15.6
Approach LOS C B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.9 21.2 7.6 9.6 6.7 21.4 5.1 12.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 18.0 5.0 26.0 5.0 18.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 3.7 14.4 3.3 3.2 3.5 14.9 2.5 3.3 Green Ext Time (p_c), s 0.0 2.8 0.0 0.2 0.0 2.5 0.0 0.2 Intersection Summary
HCM 7th Control Delay, s/veh 15.5
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 153 0 195 0 0 0 181 1504 0 0 1436 190 Future Volume (veh/h) 153 0 195 0 0 0 181 1504 0 0 1436 190 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 166 0 212 0 0 0 197 1635 0 0 1561 207 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 1015 0 317 0 374 0 249 3234 0 0 2055 638
Arrive On Green 0.20 0.00 0.20 0.00 0.00 0.00 0.14 0.62 0.00 0.00 0.40 0.40 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 166 0 212 0 0 0 197 1635 0 0 1561 207 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 1.8 0.0 5.4 0.0 0.0 0.0 4.7 7.7 0.0 0.0 11.6 4.0 Cycle Q Clear(g_c), s 1.8 0.0 5.4 0.0 0.0 0.0 4.7 7.7 0.0 0.0 11.6 4.0 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 1015 0 317 0 374 0 249 3234 0 0 2055 638 V/C Ratio(X) 0.16 0.00 0.67 0.00 0.00 0.00 0.79 0.51 0.00 0.00 0.76 0.32 Avail Cap(c_a), veh/h 2056 0 795 0 938 0 284 3492 0 0 2212 687 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 15.1 0.0 16.5 0.0 0.0 0.0 18.6 4.6 0.0 0.0 11.6 9.3 Incr Delay (d2), s/veh 0.1 0.0 2.4 0.0 0.0 0.0 12.6 0.1 0.0 0.0 1.5 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 1.7 0.0 0.0 0.0 2.3 0.6 0.0 0.0 2.9 0.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 15.2 0.0 19.0 0.0 0.0 0.0 31.2 4.7 0.0 0.0 13.1 9.6 LnGrp LOS B B C A B A
Approach Vol, veh/h 378 0 1832 1768
Approach Delay, s/veh 17.3 0.0 7.6 12.7
Approach LOS B A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 31.8 12.8 10.1 21.7 12.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 30.0 22.0 7.0 19.0 22.0
Max Q Clear Time (g_c+I1), s 9.7 7.4 6.7 13.6 0.0
Green Ext Time (p_c), s 10.7 1.4 0.0 4.1 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 10.8
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/01/2026
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 44 0 212 64 0 11 275 1974 76 9 1891 51 Future Volume (veh/h) 44 0 212 64 0 11 275 1974 76 9 1891 51 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 272 67 0 12 289 2078 80 9 1991 54 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 243 412 273 0 206 341 3360 1043 21 2428 742 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.19 0.65 0.65 0.01 0.47 0.47 Sat Flow, veh/h 0 1870 3170 1125 0 1585 1781 5187 1610 1810 5187 1585 Grp Volume(v), veh/h 0 0 272 67 0 12 289 2078 80 9 1991 54 Grp Sat Flow(s),veh/h/ln 0 1870 1585 1125 0 1585 1781 1729 1610 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 4.7 3.1 0.0 0.4 8.9 13.4 1.0 0.3 18.9 1.1 Cycle Q Clear(g_c), s 0.0 0.0 4.7 3.1 0.0 0.4 8.9 13.4 1.0 0.3 18.9 1.1 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 243 412 273 0 206 341 3360 1043 21 2428 742 V/C Ratio(X) 0.00 0.00 0.66 0.25 0.00 0.06 0.85 0.62 0.08 0.43 0.82 0.07 Avail Cap(c_a), veh/h 0 591 1001 481 0 500 375 3360 1043 159 2548 779 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 23.6 22.9 0.0 21.7 22.2 5.9 3.7 28.0 13.1 8.4 Incr Delay (d2), s/veh 0.0 0.0 1.8 0.5 0.0 0.1 15.4 0.3 0.0 13.1 2.2 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 1.7 0.8 0.0 0.1 4.5 1.9 0.1 0.2 5.2 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 25.4 23.4 0.0 21.9 37.6 6.2 3.8 41.1 15.3 8.4 LnGrp LOS C C C D A A D B A
Approach Vol, veh/h 272 79 2447 2054
Approach Delay, s/veh 25.4 23.2 9.9 15.2
Approach LOS C C A B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.7 40.9 11.4 14.9 30.7 11.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 35.0 18.0 12.0 28.0 18.0 Max Q Clear Time (g_c+I1), s 2.3 15.4 6.7 10.9 20.9 5.1 Green Ext Time (p_c), s 0.0 13.8 0.8 0.1 5.8 0.2
Intersection Summary
HCM 7th Control Delay, s/veh 13.2
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 368 248 0 1956 1919 739
Future Volume (veh/h) 368 248 0 1956 1919 739
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 444 223 0 2126 2086 0
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 734 326 0 3257 3257
Arrive On Green 0.20 0.20 0.00 0.63 0.63 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 444 223 0 2126 2086 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 5.3 6.1 0.0 12.2 11.8 0.0
Cycle Q Clear(g_c), s 5.3 6.1 0.0 12.2 11.8 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 734 326 0 3257 3257
V/C Ratio(X) 0.61 0.68 0.00 0.65 0.64
Avail Cap(c_a), veh/h 1150 511 0 4064 4064
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 17.1 17.4 0.0 5.5 5.5 0.0
Incr Delay (d2), s/veh 0.8 2.5 0.0 0.3 0.2 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.0 2.2 0.0 1.1 1.1 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 17.9 19.9 0.0 5.8 5.7 0.0
LnGrp LOS B B A A
Approach Vol, veh/h 667 2126 2086
Approach Delay, s/veh 18.6 5.8 5.7
Approach LOS B A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 33.7 13.6 33.7
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 37.0 15.0 37.0
Max Q Clear Time (g_c+I1), s 14.2 8.1 13.8
Green Ext Time (p_c), s 15.4 1.5 15.3
Intersection Summary
HCM 7th Control Delay, s/veh 7.5
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 450 0 173 0 1793 705 670 1506 0 Future Volume (veh/h) 0 0 0 450 0 173 0 1793 705 670 1506 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 474 0 182 0 1887 742 705 1585 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 3 0 609 0 542 0 2270 967 796 3736 0
Arrive On Green 0.00 0.00 0.00 0.17 0.00 0.17 0.00 0.44 0.44 0.23 0.72 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 474 0 182 0 1887 742 705 1585 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 9.0 0.0 3.6 0.0 23.1 24.8 14.0 8.8 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 9.0 0.0 3.6 0.0 23.1 24.8 14.0 8.8 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 3 0 609 0 542 0 2270 967 796 3736 0 V/C Ratio(X) 0.00 0.00 0.00 0.78 0.00 0.34 0.00 0.83 0.77 0.89 0.42 0.00 Avail Cap(c_a), veh/h 0 156 0 957 0 1300 0 2311 979 831 3827 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 28.6 0.0 26.3 0.0 17.9 10.4 26.9 4.0 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 2.2 0.0 0.4 0.0 2.7 3.7 11.0 0.1 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 3.7 0.0 1.3 0.0 7.7 7.0 6.2 1.2 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 30.8 0.0 26.7 0.0 20.5 14.1 37.8 4.1 0.0 LnGrp LOS C C C B D A
Approach Vol, veh/h 0 656 2629 2290
Approach Delay, s/veh 0.0 29.6 18.7 14.5
Approach LOS C B B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 20.3 35.4 16.1 0.0 55.7 16.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 17.0 32.0 19.0 6.0 53.0 29.0 Max Q Clear Time (g_c+I1), s 16.0 26.8 11.0 0.0 10.8 5.6 Green Ext Time (p_c), s 0.3 4.7 1.1 0.0 14.0 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 18.3
HCM 7th LOS B
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 169 327 63 199 526 351 242 1641 163 279 987 464 Future Volume (veh/h) 169 327 63 199 526 351 242 1641 163 279 987 464 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 184 355 68 216 572 382 263 1784 177 303 1073 504 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 203 1384 424 298 1523 466 325 1778 176 325 1922 597 Arrive On Green 0.06 0.27 0.27 0.08 0.29 0.29 0.09 0.37 0.37 0.09 0.37 0.37 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4798 474 3510 5187 1610 Grp Volume(v), veh/h 184 355 68 216 572 382 263 1284 677 303 1073 504 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1815 1755 1729 1610 Q Serve(g_s), s 4.5 4.7 2.8 5.2 7.6 19.3 6.3 32.0 32.0 7.4 14.2 24.8 Cycle Q Clear(g_c), s 4.5 4.7 2.8 5.2 7.6 19.3 6.3 32.0 32.0 7.4 14.2 24.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 203 1384 424 298 1523 466 325 1281 672 325 1922 597 V/C Ratio(X) 0.91 0.26 0.16 0.73 0.38 0.82 0.81 1.00 1.01 0.93 0.56 0.84 Avail Cap(c_a), veh/h 203 1742 534 407 2042 625 325 1281 672 325 1922 597 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 40.4 24.9 24.3 38.5 24.2 28.4 38.4 27.2 27.2 38.9 21.6 24.9 Incr Delay (d2), s/veh 38.1 0.1 0.2 4.1 0.2 6.3 14.1 25.6 36.5 32.7 0.4 10.8 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.9 1.8 1.0 2.3 2.9 7.5 3.2 15.8 18.7 4.4 5.1 10.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 78.5 25.0 24.4 42.6 24.4 34.7 52.5 52.8 63.7 71.6 21.9 35.7 LnGrp LOS E C C D C C D F F E C D
Approach Vol, veh/h 607 1170 2224 1880
Approach Delay, s/veh 41.2 31.1 56.1 33.6
Approach LOS D C E C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.0 36.0 11.3 27.0 12.0 36.0 9.0 29.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 32.0 10.0 29.0 8.0 32.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 9.4 34.0 7.2 6.7 8.3 26.8 6.5 21.3 Green Ext Time (p_c), s 0.0 0.0 0.2 2.3 0.0 3.5 0.0 4.0 Intersection Summary
HCM 7th Control Delay, s/veh 42.4
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 207 0 272 0 0 0 117 700 0 0 1150 116 Future Volume (veh/h) 207 0 272 0 0 0 117 700 0 0 1150 116 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 225 0 296 0 0 0 127 761 0 0 1250 126 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 589 0 0 0 5 0 342 3218 0 0 2163 662
Arrive On Green 0.17 0.00 0.00 0.00 0.00 0.00 0.10 0.62 0.00 0.00 0.42 0.42 Sat Flow, veh/h 3510 225 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 225 14.4 0 0 0 127 761 0 0 1250 126 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 2.2 0.0 0.0 0.0 1.3 2.5 0.0 0.0 7.0 1.9 Cycle Q Clear(g_c), s 2.2 0.0 0.0 0.0 1.3 2.5 0.0 0.0 7.0 1.9 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 589 0 5 0 342 3218 0 0 2163 662
V/C Ratio(X) 0.38 0.00 0.00 0.00 0.37 0.24 0.00 0.00 0.58 0.19 Avail Cap(c_a), veh/h 2603 0 1459 0 465 4258 0 0 3022 926 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.0 0.0 0.0 0.0 16.0 3.2 0.0 0.0 8.5 7.0 Incr Delay (d2), s/veh 0.4 0.0 0.0 0.0 0.7 0.0 0.0 0.0 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.0 0.0 0.0 0.4 0.1 0.0 0.0 1.3 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.4 0.0 0.0 0.0 16.6 3.2 0.0 0.0 8.7 7.1 LnGrp LOS B B A A A
Approach Vol, veh/h 0 888 1376
Approach Delay, s/veh 0.0 5.1 8.6
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 27.4 7.7 19.7 10.3 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 4.5 3.3 9.0 4.2 0.0
Green Ext Time (p_c), s 4.9 0.1 6.7 0.7 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.9
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 150 959 169 242 472 227 78 502 215 522 799 99 Future Volume (veh/h) 150 959 169 242 472 227 78 502 215 522 799 99 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.98 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 163 1042 184 263 513 247 85 546 234 567 868 108 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 243 1610 490 273 1654 503 191 1157 354 637 1816 556 Arrive On Green 0.07 0.31 0.31 0.08 0.32 0.32 0.05 0.22 0.22 0.18 0.35 0.35 Sat Flow, veh/h 3510 5187 1577 3510 5187 1579 3510 5187 1585 3510 5187 1587 Grp Volume(v), veh/h 163 1042 184 263 513 247 85 546 234 567 868 108 Grp Sat Flow(s),veh/h/ln 1755 1729 1577 1755 1729 1579 1755 1729 1585 1755 1729 1587 Q Serve(g_s), s 3.5 13.4 7.0 5.8 5.8 9.8 1.8 7.1 10.4 12.2 10.1 3.7 Cycle Q Clear(g_c), s 3.5 13.4 7.0 5.8 5.8 9.8 1.8 7.1 10.4 12.2 10.1 3.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 243 1610 490 273 1654 503 191 1157 354 637 1816 556 V/C Ratio(X) 0.67 0.65 0.38 0.96 0.31 0.49 0.45 0.47 0.66 0.89 0.48 0.19 Avail Cap(c_a), veh/h 273 2285 695 273 2285 695 227 2352 719 637 2957 905 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 35.1 23.0 20.8 35.5 19.9 21.2 35.4 26.0 27.3 30.8 19.6 17.5 Incr Delay (d2), s/veh 5.3 0.4 0.5 44.4 0.1 0.7 1.6 0.3 2.1 14.7 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.6 4.9 2.4 4.0 2.1 3.3 0.8 2.6 3.8 5.9 3.6 1.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 40.4 23.4 21.2 79.9 20.0 22.0 37.0 26.3 29.4 45.5 19.8 17.7 LnGrp LOS D C C E B C D C C D B B
Approach Vol, veh/h 1389 1023 865 1543
Approach Delay, s/veh 25.1 35.9 28.2 29.1
Approach LOS C D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 18.0 21.2 10.0 28.0 8.2 31.0 9.4 28.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 14.0 35.0 6.0 34.0 5.0 44.0 6.0 34.0 Max Q Clear Time (g_c+I1), s 14.2 12.4 7.8 15.4 3.8 12.1 5.5 11.8 Green Ext Time (p_c), s 0.0 4.1 0.0 7.2 0.0 6.4 0.0 4.0 Intersection Summary
HCM 7th Control Delay, s/veh 29.2
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 58 89 188 90 37 72 101 710 64 53 1125 56 Future Volume (veh/h) 58 89 188 90 37 72 101 710 64 53 1125 56 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 63 97 204 98 40 78 110 772 70 58 1223 61 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 97 329 278 168 403 337 142 2016 612 93 1874 569 Arrive On Green 0.05 0.17 0.17 0.09 0.21 0.21 0.08 0.39 0.39 0.05 0.36 0.36 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 63 97 204 98 40 78 110 772 70 58 1223 61 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 2.1 2.7 7.3 3.2 1.0 2.5 3.6 6.5 1.7 1.9 12.0 1.6 Cycle Q Clear(g_c), s 2.1 2.7 7.3 3.2 1.0 2.5 3.6 6.5 1.7 1.9 12.0 1.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 97 329 278 168 403 337 142 2016 612 93 1874 569 V/C Ratio(X) 0.65 0.30 0.73 0.58 0.10 0.23 0.77 0.38 0.11 0.63 0.65 0.11 Avail Cap(c_a), veh/h 266 1212 1027 207 1150 961 207 2800 850 237 2885 876 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.4 22.0 23.9 26.6 19.4 20.0 27.6 13.4 12.0 28.4 16.3 13.0 Incr Delay (d2), s/veh 7.0 0.5 3.7 3.2 0.1 0.3 10.4 0.1 0.1 6.7 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 1.2 2.9 1.4 0.4 0.9 1.8 2.0 0.6 0.9 3.8 0.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 35.4 22.5 27.7 29.8 19.5 20.3 38.1 13.5 12.0 35.2 16.7 13.1 LnGrp LOS D C C C B C D B B D B B
Approach Vol, veh/h 364 216 952 1342
Approach Delay, s/veh 27.6 24.5 16.3 17.3
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.1 27.8 9.7 16.6 8.8 26.1 7.3 19.0 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 8.0 33.0 7.0 39.0 7.0 34.0 9.0 37.0 Max Q Clear Time (g_c+I1), s 3.9 8.5 5.2 9.3 5.6 14.0 4.1 4.5 Green Ext Time (p_c), s 0.0 5.2 0.0 1.2 0.0 8.0 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 18.8
HCM 7th LOS B
h + 7 h + 7 " 1 7 " 1 7
HCM 7th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 4.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 6 94 118 7 109 74
Future Vol, veh/h 6 94 118 7 109 74
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 6 96 120 7 111 76
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 384 64 0 0 128 0
Stage 1 124 - - - - -
Stage 2 260 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 591 987 - - 1456 -
Stage 1 888 - - - - -
Stage 2 759 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 546 987 - - 1456 -
Mov Cap-2 Maneuver 546 - - - - -
Stage 1 888 - - - - -
Stage 2 701 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 9.29 0 4.57

HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 942 1456 -
HCM Lane V/C Ratio - - 0.108 0.076 -
HCM Ctrl Dly (s/v) - - 9.3 7.7 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.4 0.2 -
* *1 h *
HCM 7th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1460 29 0 910 0 25
Future Vol, veh/h 1460 29 0 910 0 25
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1490 30 0 929 0 26
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 745
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 306
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 306
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 17.83

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 306 - - -
HCM Lane V/C Ratio 0.083 - - -
HCM Ctrl Dly (s/v) 17.8 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1450 28 0 957 0 24
Future Vol, veh/h 1450 28 0 957 0 24
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1480 29 0 977 0 24
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 740
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 308
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 308
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 17.68

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 308 - - -
HCM Lane V/C Ratio 0.079 - - -
HCM Ctrl Dly (s/v) 17.7 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.3 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1348 21 0 957 0 38
Future Vol, veh/h 1348 21 0 957 0 38
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1376 21 0 977 0 39
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 688
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 334
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 334
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 17.21

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 334 - - -
HCM Lane V/C Ratio 0.116 - - -
HCM Ctrl Dly (s/v) 17.2 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q(veh) 0.4 - - -
TT f Tr 7
HCM 7th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 19 0 2116 1933 36
Future Vol, veh/h 0 19 0 2116 1933 36
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 19 0 2159 1972 37
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 986 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 212 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 212 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 23.7 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 212 - -
HCM Lane V/C Ratio - 0.092 - -
HCM Ctrl Dly (s/v) - 23.7 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
I* 7
HCM 7th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 19 0 2325 1955 0
Future Vol, veh/h 0 19 0 2325 1955 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 19 0 2372 1995 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 997 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 208 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 208 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 24.05 0 0

HCM LOS C
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 208 - -
HCM Lane V/C Ratio - 0.093 - -
HCM Ctrl Dly (s/v) - 24.1 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
f ** **t
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 1: Patton Way & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 31 1021 12 3 1521 25 15 2 2 52 0 55 Future Volume (veh/h) 31 1021 12 3 1521 25 15 2 2 52 0 55 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 33 1075 13 3 1601 26 16 2 2 55 0 58 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 71 2494 30 7 2298 37 397 50 30 252 44 156
Arrive On Green 0.04 0.47 0.47 0.00 0.44 0.44 0.19 0.19 0.19 0.19 0.00 0.19 Sat Flow, veh/h 1810 5282 64 1810 5255 85 1132 261 155 542 226 810 Grp Volume(v), veh/h 33 704 384 3 1054 573 20 0 0 113 0 0 Grp Sat Flow(s),veh/h/ln 1810 1729 1888 1810 1729 1882 1548 0 0 1578 0 0 Q Serve(g_s), s 0.6 4.9 4.9 0.1 8.9 8.9 0.0 0.0 0.0 0.2 0.0 0.0 Cycle Q Clear(g_c), s 0.6 4.9 4.9 0.1 8.9 8.9 0.3 0.0 0.0 2.1 0.0 0.0 Prop In Lane 1.00 0.03 1.00 0.05 0.80 0.10 0.49 0.51
Lane Grp Cap(c), veh/h 71 1633 892 7 1512 823 477 0 0 452 0 0 V/C Ratio(X) 0.47 0.43 0.43 0.40 0.70 0.70 0.04 0.00 0.00 0.25 0.00 0.00 Avail Cap(c_a), veh/h 249 1716 937 249 1716 934 1186 0 0 1206 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 17.1 6.3 6.3 18.0 8.3 8.3 11.9 0.0 0.0 12.6 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.2 0.3 31.7 1.1 2.0 0.0 0.0 0.0 0.3 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.7 0.8 0.1 1.7 2.0 0.1 0.0 0.0 0.6 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.8 6.5 6.7 49.8 9.3 10.2 12.0 0.0 0.0 12.9 0.0 0.0 LnGrp LOS C A A D A B B B
Approach Vol, veh/h 1121 1630 20 113
Approach Delay, s/veh 7.0 9.7 12.0 12.9
Approach LOS A A B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.0 4.1 21.1 11.0 5.4 19.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 25.0 5.0 18.0 25.0 5.0 18.0 Max Q Clear Time (g_c+I1), s 2.3 2.1 6.9 4.1 2.6 10.9
Green Ext Time (p_c), s 0.0 0.0 4.7 0.5 0.0 4.9
Intersection Summary
HCM 7th Control Delay, s/veh 8.8
HCM 7th LOS A
h 11 h 1t 4 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 2: Coffee Road & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 325 727 416 268 989 258 434 1758 215 265 1498 243 Future Volume (veh/h) 325 727 416 268 989 258 434 1758 215 265 1498 243 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 1781 Adj Flow Rate, veh/h 332 742 424 273 1009 263 443 1794 219 270 1529 248 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 8 8 8 8 8 8 8 8 8 8 8 8
Cap, veh/h 346 1471 451 283 1378 551 440 1813 685 283 1580 643 Arrive On Green 0.11 0.30 0.30 0.09 0.28 0.28 0.13 0.37 0.37 0.09 0.32 0.32 Sat Flow, veh/h 3291 4863 1490 3291 4863 1488 3291 4863 1491 3291 4863 1491 Grp Volume(v), veh/h 332 742 424 273 1009 263 443 1794 219 270 1529 248 Grp Sat Flow(s),veh/h/ln 1646 1621 1490 1646 1621 1488 1646 1621 1491 1646 1621 1491 Q Serve(g_s), s 10.5 13.1 29.0 8.7 19.6 14.2 14.0 38.4 9.8 8.5 32.4 11.9 Cycle Q Clear(g_c), s 10.5 13.1 29.0 8.7 19.6 14.2 14.0 38.4 9.8 8.5 32.4 11.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 346 1471 451 283 1378 551 440 1813 685 283 1580 643 V/C Ratio(X) 0.96 0.50 0.94 0.96 0.73 0.48 1.01 0.99 0.32 0.95 0.97 0.39 Avail Cap(c_a), veh/h 346 1487 456 283 1394 556 440 1813 685 283 1580 643 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 46.6 30.0 35.6 47.7 33.9 25.3 45.3 32.6 18.0 47.6 34.8 20.4 Incr Delay (d2), s/veh 37.7 0.3 27.7 43.6 2.0 0.6 44.4 18.7 0.3 41.0 15.6 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.9 4.8 13.2 5.1 7.5 4.7 8.1 16.6 3.1 4.9 13.9 3.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 84.3 30.3 63.3 91.3 35.9 25.9 89.7 51.3 18.2 88.6 50.4 20.8 LnGrp LOS F C E F D C F D B F D C
Approach Vol, veh/h 1498 1545 2456 2047
Approach Delay, s/veh 51.6 44.0 55.3 51.8
Approach LOS D D E D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 13.0 43.0 13.0 35.6 18.0 38.0 15.0 33.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 9.0 39.0 9.0 32.0 14.0 34.0 11.0 30.0 Max Q Clear Time (g_c+I1), s 10.5 40.4 10.7 31.0 16.0 34.4 12.5 21.6 Green Ext Time (p_c), s 0.0 0.0 0.0 0.6 0.0 0.0 0.0 4.4 Intersection Summary
HCM 7th Control Delay, s/veh 51.3
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 3: Project Dwy D/NW Promenade & Rosedale Highway 12/28/2025 Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 153 1254 118 142 1355 137 188 12 70 171 12 109 Future Volume (veh/h) 153 1254 118 142 1355 137 188 12 70 171 12 109 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1870 1870 1900 1900 1870 1870 1870 1900 1870 1900 Adj Flow Rate, veh/h 156 1280 120 145 1383 140 192 12 71 183 0 111 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 2 2 0 0 2 2 2 0 2 0
Cap, veh/h 271 1622 495 183 1755 544 242 15 90 423 0 188 Arrive On Green 0.08 0.31 0.31 0.10 0.34 0.34 0.20 0.20 0.20 0.12 0.00 0.12 Sat Flow, veh/h 3510 5187 1583 1781 5187 1609 1208 75 447 3619 0 1610 Grp Volume(v), veh/h 156 1280 120 145 1383 140 275 0 0 183 0 111 Grp Sat Flow(s),veh/h/ln 1755 1729 1583 1781 1729 1609 1730 0 0 1810 0 1610 Q Serve(g_s), s 2.6 13.5 3.4 4.8 14.4 3.8 9.1 0.0 0.0 2.8 0.0 3.9 Cycle Q Clear(g_c), s 2.6 13.5 3.4 4.8 14.4 3.8 9.1 0.0 0.0 2.8 0.0 3.9 Prop In Lane 1.00 1.00 1.00 1.00 0.70 0.26 1.00 1.00
Lane Grp Cap(c), veh/h 271 1622 495 183 1755 544 347 0 0 423 0 188 V/C Ratio(X) 0.58 0.79 0.24 0.79 0.79 0.26 0.79 0.00 0.00 0.43 0.00 0.59 Avail Cap(c_a), veh/h 293 1731 528 208 1904 591 548 0 0 1087 0 484 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 26.7 18.8 15.3 26.3 17.9 14.4 22.8 0.0 0.0 24.6 0.0 25.1 Incr Delay (d2), s/veh 2.4 2.4 0.3 16.6 2.1 0.2 4.1 0.0 0.0 0.7 0.0 2.9 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 4.7 1.0 2.6 4.9 1.1 3.8 0.0 0.0 1.2 0.0 1.5 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 29.1 21.2 15.6 42.8 20.0 14.6 26.9 0.0 0.0 25.3 0.0 28.0 LnGrp LOS C C B D C B C C C
Approach Vol, veh/h 1556 1668 275 294
Approach Delay, s/veh 21.6 21.6 26.9 26.3
Approach LOS C C C C
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 16.0 10.2 22.7 11.0 8.6 24.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 19.0 7.0 20.0 18.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 11.1 6.8 15.5 5.9 4.6 16.4 Green Ext Time (p_c), s 1.0 0.0 2.9 0.8 0.0 3.9
Intersection Summary
HCM 7th Control Delay, s/veh 22.3
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. " +++ 7 h 1 7 4 h 4 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 4: Clay Patrick Farr Way & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 148 1259 170 86 1431 140 170 65 46 215 88 158 Future Volume (veh/h) 148 1259 170 86 1431 140 170 65 46 215 88 158 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 156 1325 179 91 1506 147 179 68 48 226 93 166 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 273 2145 666 118 2081 646 280 554 245 344 619 271 Arrive On Green 0.08 0.41 0.41 0.07 0.40 0.40 0.08 0.15 0.15 0.10 0.17 0.17 Sat Flow, veh/h 3510 5187 1610 1810 5187 1610 3510 3610 1601 3510 3610 1578 Grp Volume(v), veh/h 156 1325 179 91 1506 147 179 68 48 226 93 166 Grp Sat Flow(s),veh/h/ln 1755 1729 1610 1810 1729 1610 1755 1805 1601 1755 1805 1578 Q Serve(g_s), s 2.5 11.9 4.4 2.9 14.5 3.6 2.9 1.0 1.6 3.7 1.3 5.8 Cycle Q Clear(g_c), s 2.5 11.9 4.4 2.9 14.5 3.6 2.9 1.0 1.6 3.7 1.3 5.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 273 2145 666 118 2081 646 280 554 245 344 619 271 V/C Ratio(X) 0.57 0.62 0.27 0.77 0.72 0.23 0.64 0.12 0.20 0.66 0.15 0.61 Avail Cap(c_a), veh/h 296 2360 733 183 2447 760 296 1886 836 591 2190 957 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.4 13.7 11.5 27.3 15.0 11.7 26.5 21.7 21.9 25.8 20.9 22.8 Incr Delay (d2), s/veh 2.2 0.4 0.2 9.9 0.9 0.2 4.2 0.1 0.4 2.1 0.1 2.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.0 3.6 1.2 1.4 4.5 1.0 1.3 0.4 0.5 1.5 0.5 2.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 28.7 14.1 11.7 37.2 15.9 11.9 30.7 21.8 22.3 27.9 21.0 25.0 LnGrp LOS C B B D B B C C C C C C
Approach Vol, veh/h 1660 1744 295 485
Approach Delay, s/veh 15.2 16.7 27.3 25.6
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.8 13.1 7.9 28.5 8.7 14.2 8.6 27.8 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 31.0 6.0 27.0 5.0 36.0 5.0 28.0 Max Q Clear Time (g_c+I1), s 5.7 3.6 4.9 13.9 4.9 7.8 4.5 16.5 Green Ext Time (p_c), s 0.3 0.5 0.0 7.2 0.0 1.1 0.0 7.3 Intersection Summary
HCM 7th Control Delay, s/veh 17.9
HCM 7th LOS B
" +++ 7 h 1 7 * 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 5: Calloway Drive & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 225 960 402 304 663 182 355 1153 459 178 967 196 Future Volume (veh/h) 225 960 402 304 663 182 355 1153 459 178 967 196 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 1796 Adj Flow Rate, veh/h 237 1011 423 320 698 192 374 1214 483 187 1018 206 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 7 7 7 7 7 7 7 7 7 7 7 7
Cap, veh/h 297 1379 427 377 1497 464 435 1914 594 247 1139 501 Arrive On Green 0.09 0.28 0.28 0.11 0.31 0.31 0.13 0.39 0.39 0.07 0.33 0.33 Sat Flow, veh/h 3319 4904 1519 3319 4904 1519 3319 4904 1521 3319 3413 1502 Grp Volume(v), veh/h 237 1011 423 320 698 192 374 1214 483 187 1018 206 Grp Sat Flow(s),veh/h/ln 1659 1635 1519 1659 1635 1519 1659 1635 1521 1659 1706 1502 Q Serve(g_s), s 8.0 21.2 31.6 10.8 13.1 11.4 12.6 22.8 32.3 6.3 32.2 12.1 Cycle Q Clear(g_c), s 8.0 21.2 31.6 10.8 13.1 11.4 12.6 22.8 32.3 6.3 32.2 12.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 297 1379 427 377 1497 464 435 1914 594 247 1139 501 V/C Ratio(X) 0.80 0.73 0.99 0.85 0.47 0.41 0.86 0.63 0.81 0.76 0.89 0.41 Avail Cap(c_a), veh/h 379 1379 427 408 1497 464 496 1982 615 350 1230 541 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 50.8 37.0 40.7 49.5 32.0 31.4 48.4 28.1 31.0 51.7 36.0 29.3 Incr Delay (d2), s/veh 9.0 2.0 40.8 14.7 0.2 0.6 13.0 0.6 8.0 5.9 8.3 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.6 8.3 15.9 5.1 5.0 4.1 5.8 8.4 12.3 2.7 13.8 4.2 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 59.8 39.1 81.6 64.2 32.2 32.0 61.5 28.7 39.0 57.5 44.3 29.8 LnGrp LOS E D F E C C E C D E D C
Approach Vol, veh/h 1671 1210 2071 1411
Approach Delay, s/veh 52.8 40.6 37.0 43.9
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.5 48.4 16.9 36.0 18.9 42.0 14.2 38.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 46.0 14.0 32.0 17.0 41.0 13.0 33.0 Max Q Clear Time (g_c+I1), s 8.3 24.8 12.8 33.6 14.6 34.2 10.0 15.1 Green Ext Time (p_c), s 0.2 5.7 0.1 0.0 0.3 3.8 0.2 4.6 Intersection Summary
HCM 7th Control Delay, s/veh 43.4
HCM 7th LOS D
" +++ 7 " 1 7 ‘ 1 7 * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 6: Verdugo Lane & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 112 786 20 39 1041 304 47 39 40 203 47 115 Future Volume (veh/h) 112 786 20 39 1041 304 47 39 40 203 47 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 118 827 21 41 1096 320 49 41 42 214 49 121 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 151 2050 633 76 1275 566 85 260 219 267 450 380 Arrive On Green 0.08 0.40 0.40 0.04 0.35 0.35 0.05 0.14 0.14 0.15 0.24 0.24 Sat Flow, veh/h 1810 5187 1602 1810 3610 1601 1810 1900 1600 1810 1900 1604 Grp Volume(v), veh/h 118 827 21 41 1096 320 49 41 42 214 49 121 Grp Sat Flow(s),veh/h/ln 1810 1729 1602 1810 1805 1601 1810 1900 1600 1810 1900 1604 Q Serve(g_s), s 3.7 6.6 0.5 1.3 16.2 9.3 1.5 1.1 1.3 6.6 1.2 3.6 Cycle Q Clear(g_c), s 3.7 6.6 0.5 1.3 16.2 9.3 1.5 1.1 1.3 6.6 1.2 3.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 151 2050 633 76 1275 566 85 260 219 267 450 380 V/C Ratio(X) 0.78 0.40 0.03 0.54 0.86 0.57 0.57 0.16 0.19 0.80 0.11 0.32 Avail Cap(c_a), veh/h 158 2050 633 189 1383 614 158 827 697 378 1059 894 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.8 12.5 10.6 27.0 17.2 15.0 26.8 21.9 22.0 23.7 17.1 18.1 Incr Delay (d2), s/veh 21.0 0.1 0.0 5.9 5.4 1.0 5.9 0.3 0.4 8.0 0.1 0.5 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 1.9 0.1 0.6 6.1 2.8 0.7 0.5 0.5 3.1 0.5 1.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 46.7 12.6 10.7 32.9 22.6 16.0 32.7 22.1 22.4 31.7 17.3 18.5 LnGrp LOS D B B C C B C C C C B B
Approach Vol, veh/h 966 1457 132 384
Approach Delay, s/veh 16.7 21.5 26.1 25.7
Approach LOS B C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 12.5 11.9 6.4 26.7 6.7 17.6 8.8 24.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 12.0 25.0 6.0 21.0 5.0 32.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 8.6 3.3 3.3 8.6 3.5 5.6 5.7 18.2 Green Ext Time (p_c), s 0.2 0.3 0.0 4.1 0.0 0.6 0.0 2.1 Intersection Summary
HCM 7th Control Delay, s/veh 20.7
HCM 7th LOS C
h +++ 7 h * 7 + 7 h * 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 7: Old Farm Road & Rosedale Highway 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 33 858 158 109 843 14 207 34 101 39 28 8 Future Volume (veh/h) 33 858 158 109 843 14 207 34 101 39 28 8 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 35 903 166 115 887 15 218 36 106 41 29 8 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 69 1162 502 148 1321 584 271 475 402 77 271 226 Arrive On Green 0.04 0.32 0.32 0.08 0.37 0.37 0.15 0.25 0.25 0.04 0.14 0.14 Sat Flow, veh/h 1810 3610 1560 1810 3610 1597 1810 1900 1606 1810 1900 1582 Grp Volume(v), veh/h 35 903 166 115 887 15 218 36 106 41 29 8 Grp Sat Flow(s),veh/h/ln 1810 1805 1560 1810 1805 1597 1810 1900 1606 1810 1900 1582 Q Serve(g_s), s 1.0 11.9 4.3 3.3 10.9 0.3 6.1 0.8 2.8 1.2 0.7 0.2 Cycle Q Clear(g_c), s 1.0 11.9 4.3 3.3 10.9 0.3 6.1 0.8 2.8 1.2 0.7 0.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 69 1162 502 148 1321 584 271 475 402 77 271 226 V/C Ratio(X) 0.51 0.78 0.33 0.78 0.67 0.03 0.80 0.08 0.26 0.53 0.11 0.04 Avail Cap(c_a), veh/h 172 1437 621 206 1506 666 343 1117 944 206 973 810 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 24.9 16.2 13.6 23.7 14.1 10.7 21.7 15.1 15.9 24.7 19.7 19.5 Incr Delay (d2), s/veh 5.7 2.2 0.4 11.6 1.0 0.0 10.4 0.1 0.3 5.5 0.2 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 4.1 1.2 1.7 3.4 0.1 3.0 0.3 0.9 0.6 0.3 0.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.6 18.4 14.0 35.4 15.0 10.7 32.0 15.2 16.2 30.2 19.9 19.5 LnGrp LOS C B B D B B C B B C B B
Approach Vol, veh/h 1104 1017 360 78
Approach Delay, s/veh 18.1 17.3 25.7 25.3
Approach LOS B B C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.3 17.2 8.3 21.0 11.9 11.5 6.0 23.3 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 31.0 6.0 21.0 10.0 27.0 5.0 22.0 Max Q Clear Time (g_c+I1), s 3.2 4.8 5.3 13.9 8.1 2.7 3.0 12.9 Green Ext Time (p_c), s 0.0 0.5 0.0 2.9 0.1 0.1 0.0 3.6 Intersection Summary
HCM 7th Control Delay, s/veh 19.1
HCM 7th LOS B
h ft 7 h ft 7 t 7 h f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 8: Coffee Road & Brimhall Road 01/01/2026
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 297 3 692 714 687 761 318 1549 23 6 1972 328 Future Volume (veh/h) 297 3 692 714 687 761 318 1549 23 6 1972 328 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 1841 Adj Flow Rate, veh/h 308 0 713 807 609 785 328 1597 24 6 2033 338 Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 4 4 4 4 4 4 4 4 4 4 4 4
Cap, veh/h 505 0 448 926 486 823 299 2251 34 40 1889 586 Arrive On Green 0.14 0.00 0.14 0.26 0.26 0.26 0.09 0.44 0.44 0.02 0.38 0.38 Sat Flow, veh/h 3506 0 3113 3506 1841 3116 3401 5100 77 1753 5025 1559 Grp Volume(v), veh/h 308 0 713 807 609 785 328 1049 572 6 2033 338 Grp Sat Flow(s),veh/h/ln 1753 0 1557 1753 1841 1558 1700 1675 1827 1753 1675 1559 Q Serve(g_s), s 10.3 0.0 18.0 27.5 33.0 31.0 11.0 31.8 31.8 0.4 47.0 21.6 Cycle Q Clear(g_c), s 10.3 0.0 18.0 27.5 33.0 31.0 11.0 31.8 31.8 0.4 47.0 21.6 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.04 1.00 1.00
Lane Grp Cap(c), veh/h 505 0 448 926 486 823 299 1479 806 40 1889 586 V/C Ratio(X) 0.61 0.00 1.59 0.87 1.25 0.95 1.10 0.71 0.71 0.15 1.08 0.58 Avail Cap(c_a), veh/h 505 0 448 926 486 823 299 1479 806 210 1889 586 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 50.2 0.0 53.5 44.0 46.0 45.3 57.0 28.4 28.4 59.9 39.0 31.1 Incr Delay (d2), s/veh 2.1 0.0 276.1 9.1 130.0 21.0 80.2 1.6 2.9 1.7 44.5 1.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.5 0.0 24.0 12.6 31.9 13.8 7.9 12.1 13.5 0.2 25.6 7.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 52.3 0.0 329.6 53.1 176.0 66.2 137.2 30.0 31.3 61.7 83.5 32.5 LnGrp LOS D F D F E F C C E F C
Approach Vol, veh/h 1021 2201 1949 2377
Approach Delay, s/veh 245.9 91.8 48.4 76.2
Approach LOS F F D E
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 6.8 59.2 22.0 15.0 51.0 37.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 15.0 43.0 18.0 11.0 47.0 33.0 Max Q Clear Time (g_c+I1), s 2.4 33.8 20.0 13.0 49.0 35.0 Green Ext Time (p_c), s 0.0 5.9 0.0 0.0 0.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 96.5
HCM 7th LOS F
Notes
User approved volume balancing among the lanes for turning movement. h 4 f? h 41 f? ‘ MT* " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 9: Harvest Creek Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (veh/h) 684 62 101 1037 55 73
Future Volume (veh/h) 684 62 101 1037 55 73
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900
Adj Flow Rate, veh/h 720 65 106 1092 58 77
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 1219 110 174 2125 112 149
Arrive On Green 0.36 0.36 0.10 0.59 0.16 0.16
Sat Flow, veh/h 3442 302 1810 3705 721 958
Grp Volume(v), veh/h 388 397 106 1092 136 0
Grp Sat Flow(s),veh/h/ln 1805 1844 1810 1805 1692 0
Q Serve(g_s), s 5.4 5.4 1.8 5.6 2.3 0.0
Cycle Q Clear(g_c), s 5.4 5.4 1.8 5.6 2.3 0.0
Prop In Lane 0.16 1.00 0.43 0.57
Lane Grp Cap(c), veh/h 657 672 174 2125 263 0
V/C Ratio(X) 0.59 0.59 0.61 0.51 0.52 0.00
Avail Cap(c_a), veh/h 1329 1358 637 4393 758 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 8.0 8.0 13.5 3.8 12.1 0.0
Incr Delay (d2), s/veh 0.8 0.8 3.4 0.2 1.6 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 1.0 0.6 0.1 0.8 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 8.9 8.9 16.9 4.0 13.7 0.0
LnGrp LOS A A B A B
Approach Vol, veh/h 785 1198 136
Approach Delay, s/veh 8.9 5.1 13.7
Approach LOS A A B
Timer - Assigned Phs 2 3 4 8
Phs Duration (G+Y+Rc), s 8.8 7.0 15.4 22.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 14.0 11.0 23.0 38.0
Max Q Clear Time (g_c+I1), s 4.3 3.8 7.4 7.6
Green Ext Time (p_c), s 0.2 0.1 3.8 8.1
Intersection Summary
HCM 7th Control Delay, s/veh 7.1
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement. 11 h * ¥
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 10: Calloway Drive & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 206 301 192 208 431 307 253 1500 135 219 1385 167 Future Volume (veh/h) 206 301 192 208 431 307 253 1500 135 219 1385 167 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 217 317 202 219 454 323 266 1579 142 231 1458 176 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 320 971 749 320 971 431 324 1751 536 321 1747 541 Arrive On Green 0.09 0.27 0.27 0.09 0.27 0.27 0.09 0.34 0.34 0.09 0.34 0.34 Sat Flow, veh/h 3510 3610 2785 3510 3610 1603 3510 5187 1587 3510 5187 1607 Grp Volume(v), veh/h 217 317 202 219 454 323 266 1579 142 231 1458 176 Grp Sat Flow(s),veh/h/ln 1755 1805 1393 1755 1805 1603 1755 1729 1587 1755 1729 1607 Q Serve(g_s), s 4.5 5.3 4.3 4.6 8.0 14.0 5.7 22.0 4.9 4.9 19.7 6.2 Cycle Q Clear(g_c), s 4.5 5.3 4.3 4.6 8.0 14.0 5.7 22.0 4.9 4.9 19.7 6.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 320 971 749 320 971 431 324 1751 536 321 1747 541 V/C Ratio(X) 0.68 0.33 0.27 0.68 0.47 0.75 0.82 0.90 0.27 0.72 0.83 0.33 Avail Cap(c_a), veh/h 416 1616 1247 324 1521 675 324 1776 543 324 1776 550 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.4 22.2 21.9 33.4 23.2 25.4 33.9 24.0 18.3 33.6 23.2 18.8 Incr Delay (d2), s/veh 2.9 0.2 0.2 5.8 0.4 2.6 15.5 6.8 0.3 7.5 3.6 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 2.0 1.3 2.1 3.1 5.0 2.9 8.8 1.6 2.2 7.5 2.1 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 36.3 22.4 22.1 39.2 23.6 28.0 49.4 30.7 18.6 41.0 26.8 19.1 LnGrp LOS D C C D C C D C B D C B
Approach Vol, veh/h 736 996 1987 1865
Approach Delay, s/veh 26.4 28.5 32.3 27.8
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.9 29.6 10.9 24.4 11.0 29.6 10.9 24.4 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 26.0 7.0 34.0 7.0 26.0 9.0 32.0 Max Q Clear Time (g_c+I1), s 6.9 24.0 6.6 7.3 7.7 21.7 6.5 16.0 Green Ext Time (p_c), s 0.0 1.6 0.0 2.6 0.0 3.2 0.2 3.4 Intersection Summary
HCM 7th Control Delay, s/veh 29.4
HCM 7th LOS C
ft tt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 11: Verdugo Lane & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 10 583 27 61 783 33 35 3 84 16 4 11 Future Volume (veh/h) 10 583 27 61 783 33 35 3 84 16 4 11 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 11 614 28 64 824 35 37 3 88 17 4 12 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 36 1041 449 152 1241 53 248 20 238 131 31 92 Arrive On Green 0.02 0.29 0.29 0.08 0.35 0.35 0.15 0.15 0.15 0.15 0.15 0.15 Sat Flow, veh/h 1810 3610 1555 1810 3523 150 1680 136 1607 896 211 633 Grp Volume(v), veh/h 11 614 28 64 422 437 40 0 88 33 0 0 Grp Sat Flow(s),veh/h/ln 1810 1805 1555 1810 1805 1868 1816 0 1607 1740 0 0 Q Serve(g_s), s 0.3 7.0 0.6 1.6 9.5 9.5 0.9 0.0 2.4 0.8 0.0 0.0 Cycle Q Clear(g_c), s 0.3 7.0 0.6 1.6 9.5 9.5 0.9 0.0 2.4 0.8 0.0 0.0 Prop In Lane 1.00 1.00 1.00 0.08 0.92 1.00 0.52 0.36
Lane Grp Cap(c), veh/h 36 1041 449 152 636 658 268 0 238 254 0 0 V/C Ratio(X) 0.31 0.59 0.06 0.42 0.66 0.66 0.15 0.00 0.37 0.13 0.00 0.00 Avail Cap(c_a), veh/h 264 2185 942 264 1093 1131 796 0 704 254 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 23.2 14.6 12.4 20.8 13.1 13.1 17.8 0.0 18.4 17.8 0.0 0.0 Incr Delay (d2), s/veh 4.7 0.5 0.1 1.9 1.2 1.2 0.3 0.0 1.0 0.2 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 2.2 0.2 0.6 2.9 3.0 0.3 0.0 0.8 0.3 0.0 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 27.8 15.2 12.4 22.7 14.3 14.3 18.0 0.0 19.4 18.0 0.0 0.0 LnGrp LOS C B B C B B B B B
Approach Vol, veh/h 653 923 128 33
Approach Delay, s/veh 15.2 14.9 19.0 18.0
Approach LOS B B B B
Timer - Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 11.1 8.0 17.8 11.0 5.0 20.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 21.0 7.0 29.0 7.0 7.0 29.0
Max Q Clear Time (g_c+I1), s 4.4 3.6 9.0 2.8 2.3 11.5
Green Ext Time (p_c), s 0.4 0.0 3.6 0.0 0.0 4.4
Intersection Summary
HCM 7th Control Delay, s/veh 15.4
HCM 7th LOS B
h ft 7 h *1 4 7 4
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 12: Jewetta Avenue & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 35 357 115 183 405 123 112 137 143 74 78 19 Future Volume (veh/h) 35 357 115 183 405 123 112 137 143 74 78 19 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.93 1.00 0.92 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 37 376 121 193 426 129 118 144 151 78 82 20 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 93 575 257 286 684 305 228 851 669 143 668 163 Arrive On Green 0.05 0.16 0.16 0.08 0.19 0.19 0.07 0.45 0.45 0.08 0.46 0.46 Sat Flow, veh/h 1810 3610 1610 3510 3610 1610 3510 1900 1493 1810 1447 353 Grp Volume(v), veh/h 37 376 121 193 426 129 118 144 151 78 0 102 Grp Sat Flow(s),veh/h/ln 1810 1805 1610 1755 1805 1610 1755 1900 1493 1810 0 1799 Q Serve(g_s), s 1.4 6.7 4.7 3.7 7.5 4.9 2.2 3.1 4.3 2.9 0.0 2.2 Cycle Q Clear(g_c), s 1.4 6.7 4.7 3.7 7.5 4.9 2.2 3.1 4.3 2.9 0.0 2.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.20
Lane Grp Cap(c), veh/h 93 575 257 286 684 305 228 851 669 143 0 831 V/C Ratio(X) 0.40 0.65 0.47 0.67 0.62 0.42 0.52 0.17 0.23 0.55 0.00 0.12 Avail Cap(c_a), veh/h 184 1311 585 357 1311 585 306 966 759 184 0 941 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 31.6 27.2 26.3 30.7 25.7 24.6 31.1 11.4 11.7 30.5 0.0 10.6 Incr Delay (d2), s/veh 2.7 1.3 1.3 3.6 0.9 0.9 1.8 0.1 0.2 3.2 0.0 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.7 1.7 1.5 2.9 1.7 0.9 1.1 1.2 1.3 0.0 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 34.3 28.4 27.6 34.3 26.6 25.5 33.0 11.4 11.8 33.8 0.0 10.6 LnGrp LOS C C C C C C C B B C B
Approach Vol, veh/h 534 748 413 180
Approach Delay, s/veh 28.7 28.4 17.7 20.7
Approach LOS C C B C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 9.4 34.8 9.6 15.0 8.5 35.8 7.6 17.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 7.0 35.0 7.0 25.0 6.0 36.0 7.0 25.0 Max Q Clear Time (g_c+I1), s 4.9 6.3 5.7 8.7 4.2 4.2 3.4 9.5 Green Ext Time (p_c), s 0.0 1.2 0.1 2.2 0.0 0.5 0.0 2.5 Intersection Summary
HCM 7th Control Delay, s/veh 25.4
HCM 7th LOS C
h ft 7 tf 7 t 7 h 1
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 13: Old Farm Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 45 385 48 59 374 101 41 35 61 122 33 57 Future Volume (veh/h) 45 385 48 59 374 101 41 35 61 122 33 57 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 47 405 51 62 394 106 43 37 64 128 35 60 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 93 812 360 114 854 379 168 387 327 338 479 400 Arrive On Green 0.05 0.23 0.23 0.06 0.24 0.24 0.05 0.20 0.20 0.10 0.25 0.25 Sat Flow, veh/h 1810 3610 1599 1810 3610 1600 3510 1900 1603 3510 1900 1584 Grp Volume(v), veh/h 47 405 51 62 394 106 43 37 64 128 35 60 Grp Sat Flow(s),veh/h/ln 1810 1805 1599 1810 1805 1600 1755 1900 1603 1755 1900 1584 Q Serve(g_s), s 1.0 3.8 1.0 1.3 3.6 2.1 0.5 0.6 1.3 1.3 0.5 1.1 Cycle Q Clear(g_c), s 1.0 3.8 1.0 1.3 3.6 2.1 0.5 0.6 1.3 1.3 0.5 1.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 93 812 360 114 854 379 168 387 327 338 479 400 V/C Ratio(X) 0.51 0.50 0.14 0.55 0.46 0.28 0.26 0.10 0.20 0.38 0.07 0.15 Avail Cap(c_a), veh/h 280 2417 1071 326 2510 1113 452 1713 1445 542 1762 1468 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 17.9 13.1 12.0 17.7 12.7 12.1 17.8 12.6 12.8 16.5 11.1 11.3 Incr Delay (d2), s/veh 4.2 0.5 0.2 4.0 0.4 0.4 0.8 0.1 0.3 0.7 0.1 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.4 1.1 0.3 0.5 1.0 0.5 0.2 0.2 0.3 0.4 0.2 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 22.2 13.6 12.2 21.7 13.1 12.5 18.6 12.7 13.1 17.1 11.1 11.5 LnGrp LOS C B B C B B B B B B B B
Approach Vol, veh/h 503 562 144 223
Approach Delay, s/veh 14.3 13.9 14.6 14.7
Approach LOS B B B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.7 11.9 6.4 12.7 5.9 13.8 6.0 13.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 6.0 35.0 7.0 26.0 5.0 36.0 6.0 27.0 Max Q Clear Time (g_c+I1), s 3.3 3.3 3.3 5.8 2.5 3.1 3.0 5.6 Green Ext Time (p_c), s 0.1 0.3 0.0 2.4 0.0 0.3 0.0 2.5 Intersection Summary
HCM 7th Control Delay, s/veh 14.2
HCM 7th LOS B
h ft 7 h ft 7 t 7 f 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 14: Allen Road & Brimhall Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 44 165 221 107 269 156 479 1306 167 165 1041 71 Future Volume (veh/h) 44 165 221 107 269 156 479 1306 167 165 1041 71 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 46 174 233 113 283 164 504 1375 176 174 1096 75 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 154 719 320 240 1159 354 557 2089 640 267 1662 509 Arrive On Green 0.04 0.20 0.20 0.07 0.22 0.22 0.16 0.40 0.40 0.08 0.32 0.32 Sat Flow, veh/h 3510 3610 1608 3510 5187 1586 3510 5187 1589 3510 5187 1588 Grp Volume(v), veh/h 46 174 233 113 283 164 504 1375 176 174 1096 75 Grp Sat Flow(s),veh/h/ln 1755 1805 1608 1755 1729 1586 1755 1729 1589 1755 1729 1588 Q Serve(g_s), s 0.8 2.6 8.6 2.0 2.8 5.6 8.9 13.6 4.7 3.0 11.5 2.1 Cycle Q Clear(g_c), s 0.8 2.6 8.6 2.0 2.8 5.6 8.9 13.6 4.7 3.0 11.5 2.1 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 154 719 320 240 1159 354 557 2089 640 267 1662 509 V/C Ratio(X) 0.30 0.24 0.73 0.47 0.24 0.46 0.91 0.66 0.28 0.65 0.66 0.15 Avail Cap(c_a), veh/h 278 1889 841 334 2796 855 557 2878 882 278 2467 755 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.2 21.3 23.7 28.3 20.1 21.2 26.1 15.3 12.6 28.3 18.5 15.3 Incr Delay (d2), s/veh 1.1 0.2 3.2 1.4 0.1 0.9 18.4 0.4 0.2 5.0 0.5 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 1.0 3.1 0.8 1.0 1.9 4.6 4.2 1.4 1.3 3.8 0.7 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.3 21.4 26.8 29.7 20.2 22.1 44.5 15.7 12.9 33.4 18.9 15.4 LnGrp LOS C C C C C C D B B C B B
Approach Vol, veh/h 453 560 2055 1345
Approach Delay, s/veh 25.1 22.7 22.5 20.6
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 8.8 29.4 8.3 16.6 14.0 24.2 6.8 18.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 35.0 6.0 33.0 10.0 30.0 5.0 34.0 Max Q Clear Time (g_c+I1), s 5.0 15.6 4.0 10.6 10.9 13.5 2.8 7.6 Green Ext Time (p_c), s 0.0 9.5 0.1 1.6 0.0 6.6 0.0 2.2 Intersection Summary
HCM 7th Control Delay, s/veh 22.2
HCM 7th LOS C
ft 7 " ttt 7 ‘ ttt 7 "" ttt 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 15: Coffee Road & Olive Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 35 465 190 255 837 36 317 732 240 58 715 71 Future Volume (veh/h) 35 465 190 255 837 36 317 732 240 58 715 71 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 37 489 200 268 881 38 334 771 253 61 753 75 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 133 964 429 374 1183 51 390 1158 513 183 1358 418 Arrive On Green 0.04 0.27 0.27 0.11 0.34 0.34 0.11 0.32 0.32 0.05 0.26 0.26 Sat Flow, veh/h 3510 3610 1607 3510 3525 152 3510 3610 1600 3510 5187 1597 Grp Volume(v), veh/h 37 489 200 268 451 468 334 771 253 61 753 75 Grp Sat Flow(s),veh/h/ln 1755 1805 1607 1755 1805 1872 1755 1805 1600 1755 1729 1597 Q Serve(g_s), s 0.6 7.2 6.6 4.7 14.0 14.0 5.9 11.6 8.0 1.1 7.9 2.3 Cycle Q Clear(g_c), s 0.6 7.2 6.6 4.7 14.0 14.0 5.9 11.6 8.0 1.1 7.9 2.3 Prop In Lane 1.00 1.00 1.00 0.08 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 133 964 429 374 606 629 390 1158 513 183 1358 418 V/C Ratio(X) 0.28 0.51 0.47 0.72 0.74 0.74 0.86 0.67 0.49 0.33 0.55 0.18 Avail Cap(c_a), veh/h 278 1602 713 445 887 920 390 1888 837 278 2549 785 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 29.5 19.6 19.4 27.3 18.6 18.6 27.6 18.5 17.3 28.8 20.1 18.0 Incr Delay (d2), s/veh 1.1 0.4 0.8 4.4 2.0 1.9 17.0 0.7 0.7 1.1 0.4 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 2.7 2.3 2.0 5.3 5.5 3.1 4.0 2.7 0.4 2.7 0.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 30.6 20.0 20.1 31.7 20.5 20.4 44.6 19.2 18.0 29.9 20.5 18.2 LnGrp LOS C C C C C C D B B C C B
Approach Vol, veh/h 726 1187 1358 889
Approach Delay, s/veh 20.6 23.0 25.2 20.9
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.3 24.2 10.7 20.8 11.0 20.5 6.4 25.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 33.0 8.0 28.0 7.0 31.0 5.0 31.0 Max Q Clear Time (g_c+I1), s 3.1 13.6 6.7 9.2 7.9 9.9 2.6 16.0 Green Ext Time (p_c), s 0.0 5.3 0.1 3.5 0.0 4.7 0.0 4.9 Intersection Summary
HCM 7th Control Delay, s/veh 22.9
HCM 7th LOS C
ft 7 ‘ *1 tf 7 "" fit 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 16: Coffee Road & Hageman Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 149 638 160 228 896 109 408 1103 255 187 915 139 Future Volume (veh/h) 149 638 160 228 896 109 408 1103 255 187 915 139 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.97 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 157 672 168 240 943 115 429 1161 268 197 963 146 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 239 1439 439 320 1559 470 516 1767 548 288 1430 443 Arrive On Green 0.07 0.28 0.28 0.09 0.30 0.30 0.15 0.34 0.34 0.08 0.28 0.28 Sat Flow, veh/h 3510 5187 1582 3510 5187 1563 3510 5187 1609 3510 5187 1608 Grp Volume(v), veh/h 157 672 168 240 943 115 429 1161 268 197 963 146 Grp Sat Flow(s),veh/h/ln 1755 1729 1582 1755 1729 1563 1755 1729 1609 1755 1729 1608 Q Serve(g_s), s 3.3 8.2 6.6 5.1 11.9 4.3 9.1 14.6 10.1 4.2 12.7 5.5 Cycle Q Clear(g_c), s 3.3 8.2 6.6 5.1 11.9 4.3 9.1 14.6 10.1 4.2 12.7 5.5 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 239 1439 439 320 1559 470 516 1767 548 288 1430 443 V/C Ratio(X) 0.66 0.47 0.38 0.75 0.60 0.24 0.83 0.66 0.49 0.68 0.67 0.33 Avail Cap(c_a), veh/h 320 2097 640 320 2097 632 549 2435 755 458 2300 713 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.9 23.0 22.4 34.0 22.9 20.2 31.8 21.5 20.0 34.2 24.7 22.1 Incr Delay (d2), s/veh 3.0 0.2 0.5 9.4 0.4 0.3 10.0 0.4 0.7 2.9 0.6 0.4 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.4 3.1 2.2 2.4 4.3 1.4 4.2 5.1 3.4 1.7 4.6 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 37.9 23.2 22.9 43.4 23.3 20.5 41.8 21.9 20.7 37.1 25.3 22.6 LnGrp LOS D C C D C C D C C D C C
Approach Vol, veh/h 997 1298 1858 1306
Approach Delay, s/veh 25.5 26.8 26.3 26.7
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 10.3 30.1 11.0 25.3 15.3 25.1 9.2 27.0 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 10.0 36.0 7.0 31.0 12.0 34.0 7.0 31.0 Max Q Clear Time (g_c+I1), s 6.2 16.6 7.1 10.2 11.1 14.7 5.3 13.9 Green Ext Time (p_c), s 0.2 8.1 0.0 4.7 0.2 6.2 0.1 5.8 Intersection Summary
HCM 7th Control Delay, s/veh 26.4
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 17: Coffee Road & Riverlakes Drive/Meany Avenue 12/28/2025 Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 69 63 227 287 120 80 260 1499 213 24 1283 30 Future Volume (veh/h) 69 63 227 287 120 80 260 1499 213 24 1283 30 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 70 64 232 293 122 82 265 1530 217 24 1309 31 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 91 350 289 328 598 497 289 1960 277 46 1517 469 Arrive On Green 0.05 0.18 0.18 0.18 0.31 0.31 0.16 0.43 0.43 0.03 0.29 0.29 Sat Flow, veh/h 1810 1900 1571 1810 1900 1579 1810 4590 650 1810 5187 1605 Grp Volume(v), veh/h 70 64 232 293 122 82 265 1152 595 24 1309 31 Grp Sat Flow(s),veh/h/ln 1810 1900 1571 1810 1900 1579 1810 1729 1781 1810 1729 1605 Q Serve(g_s), s 3.3 2.5 12.4 13.9 4.1 3.3 12.6 25.1 25.2 1.1 20.9 1.2 Cycle Q Clear(g_c), s 3.3 2.5 12.4 13.9 4.1 3.3 12.6 25.1 25.2 1.1 20.9 1.2 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.36 1.00 1.00
Lane Grp Cap(c), veh/h 91 350 289 328 598 497 289 1477 761 46 1517 469 V/C Ratio(X) 0.77 0.18 0.80 0.89 0.20 0.16 0.92 0.78 0.78 0.53 0.86 0.07 Avail Cap(c_a), veh/h 186 477 394 330 629 523 289 1477 761 103 1598 494 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 41.1 30.2 34.2 35.1 22.0 21.7 36.3 21.6 21.6 42.2 29.3 22.4 Incr Delay (d2), s/veh 12.7 0.2 8.2 25.1 0.2 0.2 32.1 2.8 5.3 9.0 4.9 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.7 1.1 5.1 8.0 1.7 1.2 7.7 9.2 10.0 0.6 8.4 0.4 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 53.9 30.4 42.4 60.1 22.1 21.8 68.4 24.3 26.9 51.2 34.3 22.4 LnGrp LOS D C D E C C E C C D C C
Approach Vol, veh/h 366 497 2012 1364
Approach Delay, s/veh 42.5 44.5 30.9 34.3
Approach LOS D D C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.2 41.4 19.9 20.1 18.0 29.6 8.4 31.6 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 36.0 16.0 22.0 14.0 27.0 9.0 29.0 Max Q Clear Time (g_c+I1), s 3.1 27.2 15.9 14.4 14.6 22.9 5.3 6.1 Green Ext Time (p_c), s 0.0 6.2 0.0 0.6 0.0 2.7 0.0 0.8 Intersection Summary
HCM 7th Control Delay, s/veh 34.6
HCM 7th LOS C
h + 7 h + 7 h 1t " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 18: Coffee Road & Downing Avenue 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 50 19 94 143 33 107 95 1814 104 84 1714 44 Future Volume (veh/h) 50 19 94 143 33 107 95 1814 104 84 1714 44 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 53 20 99 151 35 113 100 1909 109 88 1804 46 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 90 34 166 277 285 238 129 2373 734 119 2344 710 Arrive On Green 0.05 0.12 0.12 0.08 0.15 0.15 0.07 0.46 0.46 0.07 0.45 0.45 Sat Flow, veh/h 1810 278 1375 3510 1900 1588 1810 5187 1605 1810 5187 1571 Grp Volume(v), veh/h 53 0 119 151 35 113 100 1909 109 88 1804 46 Grp Sat Flow(s),veh/h/ln 1810 0 1653 1755 1900 1588 1810 1729 1605 1810 1729 1571 Q Serve(g_s), s 1.7 0.0 3.9 2.4 0.9 3.8 3.1 18.2 2.3 2.8 16.9 1.0 Cycle Q Clear(g_c), s 1.7 0.0 3.9 2.4 0.9 3.8 3.1 18.2 2.3 2.8 16.9 1.0 Prop In Lane 1.00 0.83 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 90 0 199 277 285 238 129 2373 734 119 2344 710 V/C Ratio(X) 0.59 0.00 0.60 0.54 0.12 0.47 0.78 0.80 0.15 0.74 0.77 0.06 Avail Cap(c_a), veh/h 157 0 745 304 857 716 157 2518 779 157 2518 763 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 26.8 0.0 24.0 25.6 21.2 22.4 26.3 13.4 9.1 26.5 13.3 8.9 Incr Delay (d2), s/veh 6.0 0.0 2.8 1.7 0.2 1.5 17.9 1.9 0.1 12.3 1.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 0.0 1.5 0.9 0.4 1.3 1.8 5.1 0.6 1.4 4.7 0.3 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 32.9 0.0 26.9 27.2 21.4 23.9 44.2 15.3 9.2 38.8 14.7 9.0 LnGrp LOS C C C C C D B A D B A
Approach Vol, veh/h 172 299 2118 1938
Approach Delay, s/veh 28.7 25.3 16.4 15.6
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 7.8 30.4 8.6 11.0 8.1 30.1 6.9 12.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 5.0 28.0 5.0 26.0 5.0 28.0 5.0 26.0 Max Q Clear Time (g_c+I1), s 4.8 20.2 4.4 5.9 5.1 18.9 3.7 5.8 Green Ext Time (p_c), s 0.0 6.2 0.0 0.5 0.0 6.7 0.0 0.4 Intersection Summary
HCM 7th Control Delay, s/veh 17.1
HCM 7th LOS B
h 1 + 7 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 19: Coffee Road & Granite Falls Drive 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 284 0 157 0 0 0 304 1828 0 0 1671 285 Future Volume (veh/h) 284 0 157 0 0 0 304 1828 0 0 1671 285 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 299 0 165 0 0 0 320 1924 0 0 1759 300 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 868 0 268 0 316 0 376 3505 0 0 2017 626
Arrive On Green 0.17 0.00 0.17 0.00 0.00 0.00 0.21 0.68 0.00 0.00 0.39 0.39 Sat Flow, veh/h 3510 0 1610 0 1900 0 1810 5358 0 0 5358 1610 Grp Volume(v), veh/h 299 0 165 0 0 0 320 1924 0 0 1759 300 Grp Sat Flow(s),veh/h/ln 1755 0 1610 0 1900 0 1810 1729 0 0 1729 1610 Q Serve(g_s), s 3.9 0.0 4.8 0.0 0.0 0.0 8.6 9.7 0.0 0.0 15.9 7.1 Cycle Q Clear(g_c), s 3.9 0.0 4.8 0.0 0.0 0.0 8.6 9.7 0.0 0.0 15.9 7.1 Prop In Lane 1.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 868 0 268 0 316 0 376 3505 0 0 2017 626 V/C Ratio(X) 0.34 0.00 0.62 0.00 0.00 0.00 0.85 0.55 0.00 0.00 0.87 0.48 Avail Cap(c_a), veh/h 1807 0 698 0 824 0 392 3579 0 0 2045 635 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 19.3 0.0 19.6 0.0 0.0 0.0 19.3 4.2 0.0 0.0 14.3 11.6 Incr Delay (d2), s/veh 0.2 0.0 2.3 0.0 0.0 0.0 15.6 0.2 0.0 0.0 4.4 0.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 0.0 1.6 0.0 0.0 0.0 4.4 0.6 0.0 0.0 4.9 1.8 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 19.5 0.0 21.9 0.0 0.0 0.0 35.0 4.4 0.0 0.0 18.7 12.2 LnGrp LOS B C C A B B
Approach Vol, veh/h 464 0 2244 2059
Approach Delay, s/veh 20.4 0.0 8.8 17.8
Approach LOS C A B
Timer - Assigned Phs 2 4 5 6 8
Phs Duration (G+Y+Rc), s 38.3 12.4 14.6 23.7 12.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 35.0 22.0 11.0 20.0 22.0
Max Q Clear Time (g_c+I1), s 11.7 6.8 10.6 17.9 0.0
Green Ext Time (p_c), s 14.0 1.6 0.0 1.8 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 13.8
HCM 7th LOS B
1 4 " 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 20: Coffee Road & Project Dwy G/Jet Way 01/03/2026
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 81 0 397 96 0 73 446 2149 112 13 2147 81 Future Volume (veh/h) 81 0 397 96 0 73 446 2149 112 13 2147 81 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 1870 1900 1900 1900 1900 1870 Adj Flow Rate, veh/h 0 0 494 98 0 74 455 2193 114 13 2191 83 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 2 2 2 0 2 0 2 0 0 0 0 2
Cap, veh/h 0 240 407 186 0 204 485 3857 1173 27 2523 771 Arrive On Green 0.00 0.00 0.13 0.13 0.00 0.13 0.27 0.74 0.74 0.01 0.49 0.49 Sat Flow, veh/h 0 1870 3170 917 0 1585 1781 5187 1577 1810 5187 1585 Grp Volume(v), veh/h 0 0 494 98 0 74 455 2193 114 13 2191 83 Grp Sat Flow(s),veh/h/ln 0 1870 1585 917 0 1585 1781 1729 1577 1810 1729 1585 Q Serve(g_s), s 0.0 0.0 13.6 11.1 0.0 4.5 26.5 19.9 2.1 0.8 39.9 3.0 Cycle Q Clear(g_c), s 0.0 0.0 13.6 11.1 0.0 4.5 26.5 19.9 2.1 0.8 39.9 3.0 Prop In Lane 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 240 407 186 0 204 485 3857 1173 27 2523 771 V/C Ratio(X) 0.00 0.00 1.21 0.53 0.00 0.36 0.94 0.57 0.10 0.48 0.87 0.11 Avail Cap(c_a), veh/h 0 405 686 266 0 343 520 3907 1188 85 2637 806 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 46.3 45.2 0.0 42.3 37.8 6.0 3.8 51.9 24.3 14.8 Incr Delay (d2), s/veh 0.0 0.0 108.6 2.3 0.0 1.1 24.3 0.2 0.0 12.5 3.3 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 11.4 2.6 0.0 1.8 13.9 4.6 0.4 0.4 14.8 1.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 154.9 47.5 0.0 43.4 62.0 6.2 3.8 64.4 27.5 14.8 LnGrp LOS F D D E A A E C B
Approach Vol, veh/h 494 172 2762 2287
Approach Delay, s/veh 154.9 45.7 15.3 27.3
Approach LOS F D B C
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 5.6 83.0 17.6 32.9 55.7 17.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 5.0 80.0 23.0 31.0 54.0 23.0 Max Q Clear Time (g_c+I1), s 2.8 21.9 0.0 28.5 41.9 13.1 Green Ext Time (p_c), s 0.0 28.6 0.0 0.4 9.8 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 33.1
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. 4 7 h 1 " 1 7 " 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 21: Coffee Road & Westview Parkway EB Ramps 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 333 205 0 2241 2130 816
Future Volume (veh/h) 333 205 0 2241 2130 816
Initial Q (Qb), veh 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1900 1900 0 1900 1900 1900
Adj Flow Rate, veh/h 376 189 0 2359 2242 0
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 0 0 0 0 0 0
Cap, veh/h 623 277 0 3460 3460
Arrive On Green 0.17 0.17 0.00 0.67 0.67 0.00
Sat Flow, veh/h 3619 1610 0 5529 5358 1610
Grp Volume(v), veh/h 376 189 0 2359 2242 0
Grp Sat Flow(s),veh/h/ln 1810 1610 0 1729 1729 1610
Q Serve(g_s), s 4.8 5.5 0.0 13.8 12.6 0.0
Cycle Q Clear(g_c), s 4.8 5.5 0.0 13.8 12.6 0.0
Prop In Lane 1.00 1.00 0.00 1.00
Lane Grp Cap(c), veh/h 623 277 0 3460 3460
V/C Ratio(X) 0.60 0.68 0.00 0.68 0.65
Avail Cap(c_a), veh/h 946 421 0 4068 4068
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 0.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 19.0 19.3 0.0 5.1 4.9 0.0
Incr Delay (d2), s/veh 0.9 3.0 0.0 0.4 0.3 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.9 2.1 0.0 1.0 0.9 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 20.0 22.3 0.0 5.4 5.1 0.0
LnGrp LOS B C A A
Approach Vol, veh/h 565 2359 2242
Approach Delay, s/veh 20.7 5.4 5.1
Approach LOS C A A
Timer - Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 37.2 12.6 37.2
Change Period (Y+Rc), s 4.0 4.0 4.0
Max Green Setting (Gmax), s 39.0 13.0 39.0
Max Q Clear Time (g_c+I1), s 15.8 7.5 14.6
Green Ext Time (p_c), s 17.4 1.1 17.1
Intersection Summary
HCM 7th Control Delay, s/veh 7.0
HCM 7th LOS A
Notes
User approved volume balancing among the lanes for turning movement.

Unsignalized Delay for [SBR] is excluded from calculations of the approach delay and intersection delay. * r 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 22: Coffee Road & Truxtun Avenue 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 921 0 506 0 1746 379 404 1824 0 Future Volume (veh/h) 0 0 0 921 0 506 0 1746 379 404 1824 0 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1900 1870 1900 0 1900 1900 1900 1900 0 Adj Flow Rate, veh/h 0 0 0 969 0 533 0 1838 399 425 1920 0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 0 2 0 0 0 0 0 0 0
Cap, veh/h 0 2 0 1070 0 952 0 2105 1121 501 3115 0
Arrive On Green 0.00 0.00 0.00 0.30 0.00 0.30 0.00 0.41 0.41 0.14 0.60 0.00 Sat Flow, veh/h 0 -74814 0 3619 0 3220 0 5358 1590 3510 5358 0 Grp Volume(v), veh/h 0 0 0 969 0 533 0 1838 399 425 1920 0 Grp Sat Flow(s),veh/h/ln 0 1870 0 1810 0 1610 0 1729 1590 1755 1729 0 Q Serve(g_s), s 0.0 0.0 0.0 19.8 0.0 10.8 0.0 25.1 7.7 9.1 18.1 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 19.8 0.0 10.8 0.0 25.1 7.7 9.1 18.1 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 2 0 1070 0 952 0 2105 1121 501 3115 0 V/C Ratio(X) 0.00 0.00 0.00 0.91 0.00 0.56 0.00 0.87 0.36 0.85 0.62 0.00 Avail Cap(c_a), veh/h 0 170 0 1127 0 1463 0 2154 1136 501 3163 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 26.1 0.0 22.9 0.0 21.1 4.6 32.2 9.8 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 10.2 0.0 0.5 0.0 4.2 0.2 12.9 0.4 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 9.1 0.0 3.7 0.0 9.1 1.5 4.4 4.7 0.0 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 0.0 0.0 0.0 36.3 0.0 23.4 0.0 25.3 4.8 45.1 10.1 0.0 LnGrp LOS D C C A D B
Approach Vol, veh/h 0 1502 2237 2345
Approach Delay, s/veh 0.0 31.7 21.6 16.5
Approach LOS C C B
Timer - Assigned Phs 1 2 3 4 6 8
Phs Duration (G+Y+Rc), s 15.0 35.3 26.8 0.0 50.3 26.8
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 11.0 32.0 24.0 7.0 47.0 35.0 Max Q Clear Time (g_c+I1), s 11.1 27.1 21.8 0.0 20.1 12.8 Green Ext Time (p_c), s 0.0 4.2 0.9 0.0 15.3 2.1
Intersection Summary
HCM 7th Control Delay, s/veh 22.1
HCM 7th LOS C
Notes
User approved volume balancing among the lanes for turning movement. 4 1 7 T 7 I" 1
I
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 23: Gosford Road/Coffee Road & Stockdale Highway 12/27/2025 Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 327 535 154 305 678 407 158 1203 215 346 1788 337 Future Volume (veh/h) 327 535 154 305 678 407 158 1203 215 346 1788 337 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 344 563 162 321 714 428 166 1266 226 364 1882 355 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 358 1494 458 393 1546 474 227 1466 262 422 2008 623 Arrive On Green 0.10 0.29 0.29 0.11 0.30 0.30 0.06 0.33 0.33 0.12 0.39 0.39 Sat Flow, veh/h 3510 5187 1590 3510 5187 1588 3510 4426 790 3510 5187 1610 Grp Volume(v), veh/h 344 563 162 321 714 428 166 989 503 364 1882 355 Grp Sat Flow(s),veh/h/ln 1755 1729 1590 1755 1729 1588 1755 1729 1758 1755 1729 1610 Q Serve(g_s), s 10.5 9.3 8.7 9.6 12.1 27.9 5.0 28.9 28.9 11.0 37.6 18.7 Cycle Q Clear(g_c), s 10.5 9.3 8.7 9.6 12.1 27.9 5.0 28.9 28.9 11.0 37.6 18.7 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.45 1.00 1.00
Lane Grp Cap(c), veh/h 358 1494 458 393 1546 474 227 1145 582 422 2008 623 V/C Ratio(X) 0.96 0.38 0.35 0.82 0.46 0.90 0.73 0.86 0.86 0.86 0.94 0.57 Avail Cap(c_a), veh/h 358 1494 458 521 1635 501 228 1154 587 423 2020 627 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 48.2 30.7 30.4 46.8 30.8 36.4 49.5 33.8 33.8 46.6 31.8 26.0 Incr Delay (d2), s/veh 37.2 0.2 0.5 7.4 0.2 19.1 11.4 6.9 12.6 16.4 9.1 1.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.3 3.8 3.3 4.5 4.8 12.7 2.4 12.2 13.3 5.5 15.8 6.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 85.4 30.8 30.9 54.2 31.0 55.5 61.0 40.7 46.4 63.0 40.9 27.2 LnGrp LOS F C C D C E E D D E D C
Approach Vol, veh/h 1069 1463 1658 2601
Approach Delay, s/veh 48.4 43.3 44.5 42.1
Approach LOS D D D D
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 17.0 39.7 16.1 35.1 11.0 45.7 15.0 36.1 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 13.0 36.0 16.0 29.0 7.0 42.0 11.0 34.0 Max Q Clear Time (g_c+I1), s 13.0 30.9 11.6 11.3 7.0 39.6 12.5 29.9 Green Ext Time (p_c), s 0.0 3.5 0.4 3.8 0.0 2.1 0.0 2.2 Intersection Summary
HCM 7th Control Delay, s/veh 43.9
HCM 7th LOS D
" +++ 7 " 1 7 ‘ MT* "I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 24: Calloway Drive & Noriega Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 146 0 176 0 0 0 232 1284 0 0 1161 147 Future Volume (veh/h) 146 0 176 0 0 0 232 1284 0 0 1161 147 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 0 1900 1900 1900 1900 1900 1900 0 0 1900 1900 Adj Flow Rate, veh/h 154 0 185 0 0 0 244 1352 0 0 1222 155 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 521 0 0 0 5 0 428 3320 0 0 2138 655
Arrive On Green 0.15 0.00 0.00 0.00 0.00 0.00 0.12 0.64 0.00 0.00 0.41 0.41 Sat Flow, veh/h 3510 154 0 -76000 0 3510 5358 0 0 5358 1589 Grp Volume(v), veh/h 154 14.7 0 0 0 244 1352 0 0 1222 155 Grp Sat Flow(s),veh/h/ln 1755 B 0 1900 0 1755 1729 0 0 1729 1589 Q Serve(g_s), s 1.5 0.0 0.0 0.0 2.5 4.8 0.0 0.0 6.9 2.4 Cycle Q Clear(g_c), s 1.5 0.0 0.0 0.0 2.5 4.8 0.0 0.0 6.9 2.4 Prop In Lane 1.00 0.00 0.00 1.00 0.00 0.00 1.00
Lane Grp Cap(c), veh/h 521 0 5 0 428 3320 0 0 2138 655
V/C Ratio(X) 0.30 0.00 0.00 0.00 0.57 0.41 0.00 0.00 0.57 0.24 Avail Cap(c_a), veh/h 2599 0 1457 0 464 4252 0 0 3018 924 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 0.00 0.00 1.00 1.00 0.00 0.00 1.00 1.00 Uniform Delay (d), s/veh 14.3 0.0 0.0 0.0 15.7 3.3 0.0 0.0 8.5 7.2 Incr Delay (d2), s/veh 0.3 0.0 0.0 0.0 1.4 0.1 0.0 0.0 0.2 0.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 0.0 0.0 0.8 0.0 0.0 0.0 1.3 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 14.7 0.0 0.0 0.0 17.1 3.4 0.0 0.0 8.8 7.4 LnGrp LOS B B A A A
Approach Vol, veh/h 0 1596 1377
Approach Delay, s/veh 0.0 5.5 8.6
Approach LOS A A
Timer - Assigned Phs 2 5 6 7 8
Phs Duration (G+Y+Rc), s 28.2 8.6 19.6 9.6 0.0
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 5.0 22.0 28.0 29.0
Max Q Clear Time (g_c+I1), s 6.8 4.5 8.9 3.5 0.0
Green Ext Time (p_c), s 9.6 0.0 6.7 0.5 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 7.3
HCM 7th LOS A
f? 4 ‘ 1 T 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 25: Calloway Drive & Hageman Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 173 642 164 270 1007 417 179 956 243 310 850 123 Future Volume (veh/h) 173 642 164 270 1007 417 179 956 243 310 850 123 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.98 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 182 676 173 284 1060 439 188 1006 256 326 895 129 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 262 1654 503 362 1802 549 268 1447 443 404 1648 504 Arrive On Green 0.07 0.32 0.32 0.10 0.35 0.35 0.08 0.28 0.28 0.12 0.32 0.32 Sat Flow, veh/h 3510 5187 1577 3510 5187 1580 3510 5187 1586 3510 5187 1587 Grp Volume(v), veh/h 182 676 173 284 1060 439 188 1006 256 326 895 129 Grp Sat Flow(s),veh/h/ln 1755 1729 1577 1755 1729 1580 1755 1729 1586 1755 1729 1587 Q Serve(g_s), s 4.4 8.9 7.3 6.9 14.6 21.9 4.5 15.1 12.1 7.9 12.4 5.3 Cycle Q Clear(g_c), s 4.4 8.9 7.3 6.9 14.6 21.9 4.5 15.1 12.1 7.9 12.4 5.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 262 1654 503 362 1802 549 268 1447 443 404 1648 504 V/C Ratio(X) 0.69 0.41 0.34 0.78 0.59 0.80 0.70 0.70 0.58 0.81 0.54 0.26 Avail Cap(c_a), veh/h 403 2026 616 403 2026 617 403 2026 620 444 2086 638 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 39.3 23.2 22.7 38.1 23.3 25.7 39.2 28.1 27.0 37.6 24.5 22.1 Incr Delay (d2), s/veh 3.3 0.2 0.4 8.9 0.4 6.7 3.3 0.6 1.2 9.8 0.3 0.3 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 3.4 2.6 3.2 5.5 8.4 2.0 5.8 4.4 3.7 4.6 1.9 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 42.6 23.4 23.1 47.0 23.7 32.3 42.5 28.7 28.2 47.3 24.8 22.3 LnGrp LOS D C C D C C D C C D C C
Approach Vol, veh/h 1031 1783 1450 1350
Approach Delay, s/veh 26.7 29.5 30.4 30.0
Approach LOS C C C C
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 14.0 28.3 13.0 31.8 10.7 31.7 10.5 34.2 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 11.0 34.0 10.0 34.0 10.0 35.0 10.0 34.0 Max Q Clear Time (g_c+I1), s 9.9 17.1 8.9 10.9 6.5 14.4 6.4 23.9 Green Ext Time (p_c), s 0.1 6.7 0.1 4.9 0.2 6.0 0.2 5.8 Intersection Summary
HCM 7th Control Delay, s/veh 29.3
HCM 7th LOS C
" +++ 7 " 1 7 ‘ 1 7 I" 1 7
HCM 7th Signalized Intersection Summary SWC Rosedale & Coffee 26: Calloway Drive & Meacham Road 12/27/2025
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 39 78 209 91 125 50 183 1340 92 31 1179 63 Future Volume (veh/h) 39 78 209 91 125 50 183 1340 92 31 1179 63 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Adj Flow Rate, veh/h 41 82 220 96 132 53 193 1411 97 33 1241 66 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 0 0 0 0 0 0 0 0 0 0 0 0
Cap, veh/h 72 339 287 124 393 328 236 2326 706 62 1828 555 Arrive On Green 0.04 0.18 0.18 0.07 0.21 0.21 0.13 0.45 0.45 0.03 0.35 0.35 Sat Flow, veh/h 1810 1900 1610 1810 1900 1587 1810 5187 1575 1810 5187 1575 Grp Volume(v), veh/h 41 82 220 96 132 53 193 1411 97 33 1241 66 Grp Sat Flow(s),veh/h/ln 1810 1900 1610 1810 1900 1587 1810 1729 1575 1810 1729 1575 Q Serve(g_s), s 1.5 2.5 8.6 3.5 3.9 1.8 6.9 13.7 2.4 1.2 13.5 1.9 Cycle Q Clear(g_c), s 1.5 2.5 8.6 3.5 3.9 1.8 6.9 13.7 2.4 1.2 13.5 1.9 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 72 339 287 124 393 328 236 2326 706 62 1828 555 V/C Ratio(X) 0.57 0.24 0.77 0.78 0.34 0.16 0.82 0.61 0.14 0.53 0.68 0.12 Avail Cap(c_a), veh/h 163 1115 945 136 1086 907 245 2887 877 163 2653 805 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 31.3 23.5 26.0 30.5 22.5 21.6 28.1 13.9 10.8 31.6 18.3 14.5 Incr Delay (d2), s/veh 6.8 0.4 4.3 22.3 0.5 0.2 18.8 0.3 0.1 6.9 0.4 0.1 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 1.1 3.5 2.2 1.7 0.7 3.9 4.2 0.8 0.6 4.5 0.6 Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 38.2 23.8 30.3 52.8 23.0 21.9 46.9 14.2 10.9 38.4 18.8 14.6 LnGrp LOS D C C D C C D B B D B B
Approach Vol, veh/h 343 281 1701 1340
Approach Delay, s/veh 29.7 33.0 17.7 19.0
Approach LOS C C B B
Timer - Assigned Phs 1 2 3 4 5 6 7 8
Phs Duration (G+Y+Rc), s 6.3 33.8 8.5 17.8 12.7 27.4 6.7 19.7 Change Period (Y+Rc), s 4.0 4.0 4.0 6.0 4.0 4.0 4.0 6.0 Max Green Setting (Gmax), s 6.0 37.0 5.0 39.0 9.0 34.0 6.0 38.0 Max Q Clear Time (g_c+I1), s 3.2 15.7 5.5 10.6 8.9 15.5 3.5 5.9 Green Ext Time (p_c), s 0.0 9.9 0.0 1.2 0.0 7.9 0.0 0.9 Intersection Summary
HCM 7th Control Delay, s/veh 20.5
HCM 7th LOS C
h + 7 h + 7 " 1 7 " 1 7
HCM 6th TWSC SWC Rosedale & Coffee
27: El Toro Viejo Rd & Project Dwy A 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 5
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 12 175 106 12 175 169
Future Vol, veh/h 12 175 106 12 175 169
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 0 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 12 179 108 12 179 172
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 558 60 0 0 120 0
Stage 1 114 - - - - -
Stage 2 444 - - - - -
Critical Hdwy 6.84 6.94 - - 4.14 -
Critical Hdwy Stg 1 5.84 - - - - -
Critical Hdwy Stg 2 5.84 - - - - -
Follow-up Hdwy 3.52 3.32 - - 2.22 -
Pot Cap-1 Maneuver 460 993 - - 1466 -
Stage 1 898 - - - - -
Stage 2 614 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 404 993 - - 1466 -
Mov Cap-2 Maneuver 404 - - - - -
Stage 1 898 - - - - -
Stage 2 539 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 10 0 4

HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 908 1466 -
HCM Lane V/C Ratio - - 0.21 0.122 -
HCM Ctrl Dly (s/v) - - 10 7.8 -
HCM Lane LOS - - B A -
HCM 95th %tile Q (veh) - - 0.8 0.4 -
* *1 h *
HCM 6th TWSC SWC Rosedale & Coffee
28: Project Dwy B & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1472 48 0 1657 0 47
Future Vol, veh/h 1472 48 0 1657 0 47
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 90 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1502 49 0 1691 0 48
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 751
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 303
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 303
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 19.1

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 303 - - -
HCM Lane V/C Ratio 0.158 - - -
HCM Ctrl Dly (s/v) 19.1 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q (veh) 0.6 - - -
TT f Tr 7
HCM 6th TWSC SWC Rosedale & Coffee
29: Project Dwy C & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1477 48 0 1652 0 48
Future Vol, veh/h 1477 48 0 1652 0 48
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1507 49 0 1686 0 49
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 754
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 302
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 302
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 19.2

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 302 - - -
HCM Lane V/C Ratio 0.162 - - -
HCM Ctrl Dly (s/v) 19.2 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q (veh) 0.6 - - -
TT f Tr 7
HCM 6th TWSC SWC Rosedale & Coffee
30: Project Dwy E & Rosedale Highway 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 1399 36 0 1634 0 58
Future Vol, veh/h 1399 36 0 1634 0 58
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 0 - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1428 37 0 1667 0 59
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 714
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 7.14
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.92
Pot Cap-1 Maneuver - - 0 - 0 321
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - - - - 321
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 18.7

HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h) 321 - - -
HCM Lane V/C Ratio 0.184 - - -
HCM Ctrl Dly (s/v) 18.7 - - -
HCM Lane LOS C - - -
HCM 95th %tile Q (veh) 0.7 - - -
TT f Tr 7
HCM 6th TWSC SWC Rosedale & Coffee
31: Coffee Road & Project Dwy F 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 35 0 2407 2212 60
Future Vol, veh/h 0 35 0 2407 2212 60
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - 50
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 36 0 2456 2257 61
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 1129 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 170 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 170 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 31.7 0 0

HCM LOS D
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 170 - -
HCM Lane V/C Ratio - 0.21 - -
HCM Ctrl Dly (s/v) - 31.7 - -
HCM Lane LOS - D - -
HCM 95th %tile Q (veh) - 0.8 - -
I* 7
HCM 6th TWSC SWC Rosedale & Coffee
32: Coffee Road & Project Dwy H 12/28/2025
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: PM Peak
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 35 0 2707 2271 0
Future Vol, veh/h 0 35 0 2707 2271 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 98 98 98 98 98 98
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 36 0 2762 2317 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 1159 - 0 - 0
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - 7.14 - - - -
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - 3.92 - - - -
Pot Cap-1 Maneuver 0 162 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 162 - - - -
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 33.4 0 0

HCM LOS D
Minor Lane/Major Mvmt NBT EBLn1 SBT SBR
Capacity (veh/h) - 162 - -
HCM Lane V/C Ratio - 0.22 - -
HCM Ctrl Dly (s/v) - 33.4 - -
HCM Lane LOS - D - -
HCM 95th %tile Q (veh) - 0.8 - -
f ** **t
Appendix I. With Improvement
Peak Hour Analysis And Signal Warrant Worksheets
HCM Signalized Intersection Capacity Analysis SWC Rosedale & Coffee 31: Coffee Road & Project Dwy F 01/01/2026
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 0 19 0 2116 1933 36
Future Volume (vph) 0 19 0 2116 1933 36
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 0.91 1.00
Frt 0.87 1.00 1.00 0.85
Flt Protected 1.00 1.00 1.00 1.00
Satd. Flow (prot) 1611 5085 5085 1583
Flt Permitted 1.00 1.00 1.00 1.00
Satd. Flow (perm) 1611 5085 5085 1583
Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 19 0 2159 1972 37
RTOR Reduction (vph) 0 16 0 0 0 0
Lane Group Flow (vph) 0 3 0 2159 1972 37
Turn Type Perm NA NA custom
Protected Phases 2 4 6 4
Permitted Phases 4 6
Actuated Green, G (s) 9.1 60.9 43.8 52.9
Effective Green, g (s) 9.1 60.9 43.8 52.9
Actuated g/C Ratio 0.15 1.00 0.72 0.87
Clearance Time (s) 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0
Lane Grp Cap (vph) 240 5085 3657 1583
v/s Ratio Prot c0.42 c0.39 0.00
v/s Ratio Perm 0.00 0.02
v/c Ratio 0.01 0.42 0.54 0.02
Uniform Delay, d1 22.1 0.0 3.9 0.5
Progression Factor 1.00 1.00 1.00 1.00
Incremental Delay, d2 0.0 0.1 0.2 0.0
Delay (s) 22.1 0.1 4.1 0.5
Level of Service C A A A
Approach Delay (s/veh) 22.1 0.1 4.0
Approach LOS C A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 2.1 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.55
Actuated Cycle Length (s) 60.9 Sum of lost time (s) 8.0 Intersection Capacity Utilization 49.8% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
r 7
HCM Signalized Intersection Capacity Analysis SWC Rosedale & Coffee 31: Coffee Road & Project Dwy F 01/01/2026
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 0 35 0 2407 2212 60
Future Volume (vph) 0 35 0 2407 2212 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 0.91 1.00
Frt 0.87 1.00 1.00 0.85
Flt Protected 1.00 1.00 1.00 1.00
Satd. Flow (prot) 1611 5085 5085 1583
Flt Permitted 1.00 1.00 1.00 1.00
Satd. Flow (perm) 1611 5085 5085 1583
Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 36 0 2456 2257 61
RTOR Reduction (vph) 0 13 0 0 0 0
Lane Group Flow (vph) 0 23 0 2456 2257 61
Turn Type Perm NA NA custom
Protected Phases 2 4 6 4
Permitted Phases 4 6
Actuated Green, G (s) 9.0 63.7 46.7 55.7
Effective Green, g (s) 9.0 63.7 46.7 55.7
Actuated g/C Ratio 0.14 1.00 0.73 0.87
Clearance Time (s) 4.0 4.0 4.0
Vehicle Extension (s) 3.0 3.0 3.0
Lane Grp Cap (vph) 227 5085 3727 1583
v/s Ratio Prot c0.48 c0.44 0.01
v/s Ratio Perm 0.01 0.03
v/c Ratio 0.10 0.48 0.61 0.04
Uniform Delay, d1 23.8 0.0 4.1 0.5
Progression Factor 1.00 1.00 1.00 1.00
Incremental Delay, d2 0.2 0.1 0.3 0.0
Delay (s) 24.0 0.1 4.4 0.5
Level of Service C A A A
Approach Delay (s/veh) 24.0 0.1 4.3
Approach LOS C A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 2.3 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.62
Actuated Cycle Length (s) 63.7 Sum of lost time (s) 8.0 Intersection Capacity Utilization 55.2% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
r 7
HCM Signalized Intersection Capacity Analysis SWC Rosedale & Coffee 32: Coffee Road & Project Dwy H 01/01/2026
Buildout Year 2046 + Phases I & II Synchro 12 Report
Timing Plan: AM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 0 19 0 2325 1955 0
Future Volume (vph) 0 19 0 2325 1955 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 0.91
Frt 0.87 1.00 1.00
Flt Protected 1.00 1.00 1.00
Satd. Flow (prot) 1611 5085 5085
Flt Permitted 1.00 1.00 1.00
Satd. Flow (perm) 1611 5085 5085
Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 19 0 2372 1995 0
RTOR Reduction (vph) 0 17 0 0 0 0
Lane Group Flow (vph) 0 2 0 2372 1995 0
Turn Type Perm NA NA
Protected Phases 2 4 6
Permitted Phases 4
Actuated Green, G (s) 8.1 62.6 46.5
Effective Green, g (s) 8.1 62.6 46.5
Actuated g/C Ratio 0.13 1.00 0.74
Clearance Time (s) 4.0 4.0
Vehicle Extension (s) 3.0 3.0
Lane Grp Cap (vph) 208 5085 3777
v/s Ratio Prot c0.47 c0.39
v/s Ratio Perm 0.00
v/c Ratio 0.01 0.47 0.53
Uniform Delay, d1 23.8 0.0 3.4
Progression Factor 1.00 1.00 1.00
Incremental Delay, d2 0.0 0.1 0.1
Delay (s) 23.8 0.1 3.5
Level of Service C A A
Approach Delay (s/veh) 23.8 0.1 3.5
Approach LOS C A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 1.8 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.55
Actuated Cycle Length (s) 62.6 Sum of lost time (s) 8.0 Intersection Capacity Utilization 50.3% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
r 1* 11
HCM Signalized Intersection Capacity Analysis SWC Rosedale & Coffee 32: Coffee Road & Project Dwy H 01/01/2026
Buildout Year 2046 + Project Phases I & II Synchro 12 Report Timing Plan: PM Peak
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 0 35 0 2707 2243 0
Future Volume (vph) 0 35 0 2707 2243 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Total Lost time (s) 4.0 4.0 4.0
Lane Util. Factor 1.00 0.91 0.91
Frt 0.87 1.00 1.00
Flt Protected 1.00 1.00 1.00
Satd. Flow (prot) 1611 5085 5085
Flt Permitted 1.00 1.00 1.00
Satd. Flow (perm) 1611 5085 5085
Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98
Adj. Flow (vph) 0 36 0 2762 2289 0
RTOR Reduction (vph) 0 13 0 0 0 0
Lane Group Flow (vph) 0 23 0 2762 2289 0
Turn Type Perm NA NA
Protected Phases 2 4 6
Permitted Phases 4
Actuated Green, G (s) 8.1 69.8 53.7
Effective Green, g (s) 8.1 69.8 53.7
Actuated g/C Ratio 0.12 1.00 0.77
Clearance Time (s) 4.0 4.0
Vehicle Extension (s) 3.0 3.0
Lane Grp Cap (vph) 186 5085 3912
v/s Ratio Prot c0.54 c0.45
v/s Ratio Perm 0.01
v/c Ratio 0.12 0.54 0.59
Uniform Delay, d1 27.7 0.0 3.4
Progression Factor 1.00 1.00 1.00
Incremental Delay, d2 0.3 0.1 0.2
Delay (s) 28.0 0.1 3.6
Level of Service C A A
Approach Delay (s/veh) 28.0 0.1 3.6
Approach LOS C A A
Intersection Summary
HCM 2000 Control Delay (s/veh) 1.9 HCM 2000 Level of Service A HCM 2000 Volume to Capacity ratio 0.61
Actuated Cycle Length (s) 69.8 Sum of lost time (s) 8.0 Intersection Capacity Utilization 55.8% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
r 1* 11
California MUTCD 2014 Edition Rev 9 Scenario: Buildout Year 2046 With Project Phases I-II Major Approach: Coffee Road
Minor Approach: Project Driveway F
Two
One or More
4679
35 APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
300 400 500 600 700 800 900 1000 1100 1200 1300 Minor Street Higher Volume Approach - VPH F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
35 <<
<
A
(
I
llIll
NNH
0 0™L L - E E 0
008
00d
NNI CCC000 00
o o
N H
0 ”0(C0V)
California MUTCD 2014 Edition Rev 9 Scenario: Buildout Year 2046 With Project Phases I-II Major Approach: Coffee Road
Minor Approach: Project Driveway H
Two
One or More
4978
35 APPROACH LANES

ENTER CORRECT HOURS
The plotted point falls above the applicable curve in Figure 4C-3 (Urban Areas) OR The plotted point falls above the applicable curve in Figure 4C-4 (Rural Areas) Both Approaches - Major Street
Higher Approach - Minor Street
Part B

SATISFIED
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.

ENTER PEAK HOUR VOL.

WARRANT 3 - PEAK HOUR

SATISFIED
Part A
(All parts 1, 2, and 3 below must be satisfied for the same

SATISFIED
(Part A or Part B must be satisfied)

1. The total delay experienced by traffic on one minor street approach (one direction only) controlled by a STOP sign equals or exceeds four vehicle-hours for one-lane approach, or five vehicle-hours for a two-lane approach; AND

2. The volume on the same minor street approach (one direction only) equals or exceeds 100 vph for one moving lane of traffic or 150 vph for two moving lanes; AND

3. The total entering volume serviced during the hour equals or exceeds 800 vph for intersections with four or more approaches or 650 vph for intersections with three approaches
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
YES NO
0 25
50 75
100
125
150
175
200
225
250
275
300
325
350
375
400
300 400 500 600 700 800 900 1000 1100 1200 1300 Minor Street Higher Volume Approach - VPH F
Major Street
Total of Both Approaches - VPH
My Results (Minimum
Vehicles)
35 □ □
V
□
□ 0
0 0
J 0
I B
n
u
u
0 0
n
0 Appendix J. Access Queue
Analysis Worksheets
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: AM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 57 79 276 297 344 47 137 189 198 174 59 138 Average Queue (ft) 11 33 154 156 194 13 49 102 109 85 26 64 95th Queue (ft) 38 59 247 255 302 32 105 170 173 148 50 115 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 2 0
Queuing Penalty (veh) 1 0
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 38 76 42
Average Queue (ft) 9 36 14
95th Queue (ft) 30 68 32
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: AM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB SB
Directions Served LR L
Maximum Queue (ft) 70 43
Average Queue (ft) 34 10
95th Queue (ft) 55 34
Link Distance (ft) 524 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 183 117 88 40 249 246 257 248 20 43 335 341 Average Queue (ft) 87 24 38 9 131 116 89 67 2 8 202 211 95th Queue (ft) 140 69 76 28 223 227 197 168 11 32 313 320 Link Distance (ft) 440 440 248 248 1588 1588 1588 414 414 Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 0 1 0 2
Queuing Penalty (veh) 2 1 0 0
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 341 47
Average Queue (ft) 224 16
95th Queue (ft) 327 41
Link Distance (ft) 414 414
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: AM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 48
Average Queue (ft) 18
95th Queue (ft) 45
Link Distance (ft) 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 55
Average Queue (ft) 19
95th Queue (ft) 49
Link Distance (ft) 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement EB NB
Directions Served T R
Maximum Queue (ft) 13 65
Average Queue (ft) 0 24
95th Queue (ft) 8 53
Link Distance (ft) 559 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: AM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB SB SB
Directions Served R T T T T T R
Maximum Queue (ft) 38 272 262 182 3 7 7
Average Queue (ft) 15 109 60 15 0 0 0
95th Queue (ft) 40 361 248 97 2 6 6
Link Distance (ft) 316 414 414 414 414 414
Upstream Blk Time (%) 6 0
Queuing Penalty (veh) 38 0
Storage Bay Dist (ft) 50
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB SB
Directions Served R T T T T
Maximum Queue (ft) 40 78 219 200 71
Average Queue (ft) 13 4 12 10 2
95th Queue (ft) 38 42 172 166 59
Link Distance (ft) 813 3130 3130 3130 487
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 951
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: PM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 88 123 233 274 352 77 184 331 328 305 236 218 Average Queue (ft) 38 57 136 148 204 21 77 199 206 179 46 109 95th Queue (ft) 79 99 225 249 320 54 149 308 305 273 128 182 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 1 5
Queuing Penalty (veh) 1 8
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 86 163 87
Average Queue (ft) 23 70 30
95th Queue (ft) 64 130 61
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: PM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB SB
Directions Served LR L
Maximum Queue (ft) 72 57
Average Queue (ft) 40 13
95th Queue (ft) 61 43
Link Distance (ft) 524 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 341 299 114 153 400 1053 983 538 21 90 393 406 Average Queue (ft) 213 158 48 71 257 541 380 124 2 16 237 247 95th Queue (ft) 383 363 101 190 485 1349 887 385 16 59 401 418 Link Distance (ft) 440 440 248 248 1617 1617 1617 414 414 Upstream Blk Time (%) 10 10 11 12 0 1
Queuing Penalty (veh) 0 0 0 0 1 3
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 18 30 2 7
Queuing Penalty (veh) 121 124 2 1
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 400 67
Average Queue (ft) 248 25
95th Queue (ft) 419 58
Link Distance (ft) 414 414
Upstream Blk Time (%) 1
Queuing Penalty (veh) 3
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: PM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 57
Average Queue (ft) 25
95th Queue (ft) 52
Link Distance (ft) 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement EB NB
Directions Served T R
Maximum Queue (ft) 15 68
Average Queue (ft) 1 26
95th Queue (ft) 9 57
Link Distance (ft) 393 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement EB WB WB NB
Directions Served T T T R
Maximum Queue (ft) 16 3 6 69
Average Queue (ft) 1 0 0 31
95th Queue (ft) 13 3 5 58
Link Distance (ft) 559 419 419 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2027 Cumulative + Phase I SimTraffic Report
Timing Plan: PM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB SB SB SB
Directions Served R T T T T T T R
Maximum Queue (ft) 58 418 412 377 80 84 39 9
Average Queue (ft) 20 313 183 99 3 3 2 0
95th Queue (ft) 48 561 449 317 49 50 17 7
Link Distance (ft) 316 414 414 414 414 414 414
Upstream Blk Time (%) 22 0 0 0
Queuing Penalty (veh) 154 3 2 0
Storage Bay Dist (ft) 50
Storage Blk Time (%) 0 0
Queuing Penalty (veh) 0 0
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB SB
Directions Served R T T T TR
Maximum Queue (ft) 60 879 982 645 150
Average Queue (ft) 19 382 298 76 5
95th Queue (ft) 50 1326 1002 404 89
Link Distance (ft) 822 2096 2096 2096 510
Upstream Blk Time (%) 5 0 0
Queuing Penalty (veh) 0 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 2173
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 44 76 243 262 337 42 121 211 205 188 57 157 Average Queue (ft) 12 33 127 133 194 14 52 102 110 88 24 70 95th Queue (ft) 36 61 223 230 301 33 101 179 183 159 52 129 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 1 0
Queuing Penalty (veh) 0 0
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 45 99 48
Average Queue (ft) 9 35 17
95th Queue (ft) 30 74 36
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB SB
Directions Served LR L
Maximum Queue (ft) 78 48
Average Queue (ft) 35 11
95th Queue (ft) 57 38
Link Distance (ft) 524 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 171 84 79 32 300 390 349 254 40 47 314 320 Average Queue (ft) 86 22 38 7 156 142 112 71 2 9 199 209 95th Queue (ft) 142 58 71 25 278 368 315 180 17 34 286 298 Link Distance (ft) 440 440 247 247 1593 1593 1593 414 414 Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 1 5 0 1
Queuing Penalty (veh) 4 15 0 0
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 322 56
Average Queue (ft) 218 19
95th Queue (ft) 305 44
Link Distance (ft) 414 414
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 49
Average Queue (ft) 19
95th Queue (ft) 47
Link Distance (ft) 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement EB NB
Directions Served T R
Maximum Queue (ft) 5 56
Average Queue (ft) 0 17
95th Queue (ft) 4 46
Link Distance (ft) 393 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 68
Average Queue (ft) 24
95th Queue (ft) 54
Link Distance (ft) 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB
Directions Served R T T T R
Maximum Queue (ft) 45 315 308 252 20
Average Queue (ft) 13 139 84 20 1
95th Queue (ft) 39 412 287 119 10
Link Distance (ft) 316 414 414 414
Upstream Blk Time (%) 5 0 0
Queuing Penalty (veh) 36 0 0
Storage Bay Dist (ft) 50
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB
Directions Served R T T T
Maximum Queue (ft) 47 912 1138 1303
Average Queue (ft) 14 69 85 83
95th Queue (ft) 40 486 645 626
Link Distance (ft) 948 4520 4520 4520
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 1054
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: PM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 87 111 267 298 357 56 230 312 328 283 125 261 Average Queue (ft) 36 54 161 170 223 23 107 196 203 173 41 142 95th Queue (ft) 73 93 259 282 341 48 196 296 305 257 86 236 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 2 3
Queuing Penalty (veh) 3 5
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 105 156 87
Average Queue (ft) 19 69 29
95th Queue (ft) 63 125 61
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: PM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB SB
Directions Served LR L
Maximum Queue (ft) 88 61
Average Queue (ft) 44 16
95th Queue (ft) 71 48
Link Distance (ft) 524 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 353 312 134 148 400 1632 1622 1583 273 59 414 422 Average Queue (ft) 223 170 57 52 380 1111 1048 744 61 18 294 301 95th Queue (ft) 342 303 107 126 463 2038 2023 1760 267 47 417 435 Link Distance (ft) 440 440 248 248 1602 1602 1602 414 414 Upstream Blk Time (%) 0 0 0 30 10 0 1 1
Queuing Penalty (veh) 0 0 0 0 0 0 4 4
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 57 27 11 13
Queuing Penalty (veh) 383 132 12 2
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 422 151
Average Queue (ft) 302 32
95th Queue (ft) 433 95
Link Distance (ft) 414 414
Upstream Blk Time (%) 1
Queuing Penalty (veh) 5
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: PM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement WB NB
Directions Served T R
Maximum Queue (ft) 16 68
Average Queue (ft) 1 27
95th Queue (ft) 8 54
Link Distance (ft) 393 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement EB NB
Directions Served T R
Maximum Queue (ft) 11 65
Average Queue (ft) 0 30
95th Queue (ft) 8 57
Link Distance (ft) 393 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement EB EB WB WB NB
Directions Served T T T T R
Maximum Queue (ft) 14 11 33 78 69
Average Queue (ft) 0 1 1 3 29
95th Queue (ft) 10 9 23 55 58
Link Distance (ft) 559 559 419 419 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Year 2028 Cumulative + Phases I & II SimTraffic Report
Timing Plan: PM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB SB SB SB
Directions Served R T T T T T T R
Maximum Queue (ft) 70 425 444 435 11 32 11 10
Average Queue (ft) 25 318 282 207 0 1 0 0
95th Queue (ft) 56 541 545 504 6 14 8 7
Link Distance (ft) 316 404 404 404 414 414 414
Upstream Blk Time (%) 18 4 4
Queuing Penalty (veh) 130 27 30
Storage Bay Dist (ft) 50
Storage Blk Time (%) 0 0
Queuing Penalty (veh) 0 0
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB
Directions Served R T T T
Maximum Queue (ft) 67 173 437 330
Average Queue (ft) 25 16 34 22
95th Queue (ft) 55 120 231 183
Link Distance (ft) 808 2103 2103 2103
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 2033
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 44 86 227 237 311 41 117 168 182 148 51 136 Average Queue (ft) 11 31 121 125 170 14 50 88 98 77 20 68 95th Queue (ft) 34 63 210 217 280 30 99 150 159 137 45 119 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 0 0
Queuing Penalty (veh) 0 0
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 40 89 35
Average Queue (ft) 9 33 15
95th Queue (ft) 30 67 31
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB SB
Directions Served LR L
Maximum Queue (ft) 63 60
Average Queue (ft) 34 13
95th Queue (ft) 51 42
Link Distance (ft) 524 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 192 163 83 31 349 404 338 280 79 47 342 356 Average Queue (ft) 91 27 30 6 185 151 119 88 3 10 215 230 95th Queue (ft) 151 89 65 23 306 315 259 212 47 35 320 341 Link Distance (ft) 439 439 248 248 1598 1598 1598 414 414 Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 4 3 3 1
Queuing Penalty (veh) 26 9 2 0
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 347 54
Average Queue (ft) 241 17
95th Queue (ft) 344 43
Link Distance (ft) 414 414
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 50
Average Queue (ft) 18
95th Queue (ft) 45
Link Distance (ft) 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement WB NB
Directions Served T R
Maximum Queue (ft) 106 48
Average Queue (ft) 4 20
95th Queue (ft) 75 46
Link Distance (ft) 412 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement EB EB EB NB
Directions Served T T T R
Maximum Queue (ft) 46 20 17 65
Average Queue (ft) 3 1 1 26
95th Queue (ft) 37 14 9 52
Link Distance (ft) 559 559 559 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Phases I & II SimTraffic Report
Timing Plan: AM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB SB SB
Directions Served R T T T T T T
Maximum Queue (ft) 40 305 270 259 11 25 28
Average Queue (ft) 15 164 124 63 1 2 3
95th Queue (ft) 40 451 386 242 11 23 27
Link Distance (ft) 316 414 414 414 414 414 414
Upstream Blk Time (%) 7 0 0
Queuing Penalty (veh) 52 2 1
Storage Bay Dist (ft)
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB
Directions Served R T T T
Maximum Queue (ft) 48 637 936 835
Average Queue (ft) 17 32 70 63
95th Queue (ft) 43 351 550 523
Link Distance (ft) 912 2566 2566 2566
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 1196
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Project Phases I & II SimTraffic Report Timing Plan: PM Peak
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement EB EB EB EB EB EB WB WB WB WB WB NB
Directions Served L L T T T R L T T T R LTR
Maximum Queue (ft) 109 119 274 308 354 69 171 300 322 282 122 236 Average Queue (ft) 40 59 148 160 215 24 77 185 194 165 42 127 95th Queue (ft) 82 97 246 275 334 53 147 279 287 254 87 214 Link Distance (ft) 412 412 412 412 559 559 559 559 332
Upstream Blk Time (%) 0 0
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft) 225 225 200
Storage Blk Time (%) 2 3
Queuing Penalty (veh) 4 4
Intersection: 3: Project Dwy D/NW Promenade & Rosedale Highway Movement SB SB SB
Directions Served L LT R
Maximum Queue (ft) 82 143 72
Average Queue (ft) 21 68 29
95th Queue (ft) 55 123 58
Link Distance (ft) 292
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 200
Storage Blk Time (%) 0
Queuing Penalty (veh) 0
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Project Phases I & II SimTraffic Report Timing Plan: PM Peak
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Intersection: 27: El Toro Viejo Rd & Project Dwy A
Movement WB NB SB
Directions Served LR TR L
Maximum Queue (ft) 80 9 86
Average Queue (ft) 44 0 22
95th Queue (ft) 68 4 61
Link Distance (ft) 524 704 381
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Movement EB EB WB WB NB NB NB NB NB SB SB SB
Directions Served LTR R L TR L T T T R L T T
Maximum Queue (ft) 367 309 158 115 400 1625 1605 1603 335 127 417 428 Average Queue (ft) 206 152 71 48 391 1182 1101 738 101 21 307 323 95th Queue (ft) 311 274 135 101 443 1937 1933 1723 353 80 445 462 Link Distance (ft) 440 440 248 248 1590 1590 1590 414 414 Upstream Blk Time (%) 0 27 9 1 0 1
Queuing Penalty (veh) 0 0 0 0 2 7
Storage Bay Dist (ft) 280 185 280
Storage Blk Time (%) 57 35 35 15
Queuing Penalty (veh) 420 160 40 2
Intersection: 20: Coffee Road & Project Dwy G/Jet Way
Movement SB SB
Directions Served T R
Maximum Queue (ft) 426 223
Average Queue (ft) 329 35
95th Queue (ft) 460 136
Link Distance (ft) 414 414
Upstream Blk Time (%) 2 0
Queuing Penalty (veh) 10 1
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Project Phases I & II SimTraffic Report Timing Plan: PM Peak
Intersection: 28: Project Dwy B & Rosedale Highway
Movement NB
Directions Served R
Maximum Queue (ft) 74
Average Queue (ft) 30
95th Queue (ft) 57
Link Distance (ft) 220
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 29: Project Dwy C & Rosedale Highway
Movement EB NB
Directions Served T R
Maximum Queue (ft) 11 68
Average Queue (ft) 0 30
95th Queue (ft) 7 57
Link Distance (ft) 393 241
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 30: Project Dwy E & Rosedale Highway
Movement EB EB EB WB NB
Directions Served T T T T R
Maximum Queue (ft) 50 32 11 4 71
Average Queue (ft) 8 2 1 0 32
95th Queue (ft) 49 20 9 3 59
Link Distance (ft) 559 559 559 419 288
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
SWC Rosedale & Coffee 01/02/2026
Buildout Year 2046 + Project Phases I & II SimTraffic Report Timing Plan: PM Peak
Intersection: 31: Coffee Road & Project Dwy F
Movement EB NB NB NB SB SB SB SB
Directions Served R T T T T T T R
Maximum Queue (ft) 82 435 462 458 179 225 209 45
Average Queue (ft) 29 389 376 372 25 34 35 3
95th Queue (ft) 75 539 569 566 126 148 155 27
Link Distance (ft) 316 414 414 414 414 414 414
Upstream Blk Time (%) 24 12 14 0 0
Queuing Penalty (veh) 185 91 109 0 0
Storage Bay Dist (ft) 50
Storage Blk Time (%) 4 0
Queuing Penalty (veh) 3 0
Intersection: 32: Coffee Road & Project Dwy H
Movement EB NB NB NB
Directions Served R T T T
Maximum Queue (ft) 60 2083 2066 2014
Average Queue (ft) 24 1283 1261 1032
95th Queue (ft) 54 2386 2363 2286
Link Distance (ft) 800 2107 2107 2107
Upstream Blk Time (%) 17 12 5
Queuing Penalty (veh) 0 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Zone Summary
Zone wide Queuing Penalty: 3904
Appendix K. Transit Information
49 Chester
Truxtun
99 99
58 178
Spring Creek
Kroll
Laure gl el n
Olive Olive
University
Columbus
Panorama
Roberts
Decatur
Roberts
Oildale
China Grade Loop
Bernhard
Norris Norris
Snow
Rosedale
Hwy
Granite Falls
Brimhall
Stockdale Hwy
Ming
Wilson
Planz
Pacheco
Niles
White
District
Harris
Panama
Hosking
Panama
Gosford Gosford
Ashe
Reliance
Stine
Coffee
Oakhaven
Airport
Oildale
River
Alta Vista
Union
Golden State
Haley
Mt Vernon
Manor
Patton
Fruitvale
Knudsen
Akers
Wible
Hughes
Monitor
H St
S Union
CottonwoodS Mt Vernon
McCutchen
Niles
Hageman Riverlakes
Meany
Fashion
Plaza
Stockdale
Village
Valley
Plaza
South
High
School
Walmart
Walmart
Walmart
Bakersfield
Municipal
Airport
Bakersfield
Memorial
Hospital
Garces
High
School
Kern
Medical
Center
Bakersfield
Convention Amtrak
Center
Meadows
Field
Airport
Kern
County
Fairground
Centennial
High School
Good
Samaritan
Hospital
B A
D
E F
G
NORTH
© 6/15 GET
Connections to
Rts: 21, 41, 43
44, 81, KRT
Connections to
Rts: 21, 22, 82
Bakersfield
College
C
California
State University
at Bakersfield
J
H I
Route 61
Timepoint - See
schedule for the time
bus departs this stop
Direction of bus travel
Point of interest
A

RTE/RUTA
GET 61
Connections to
Rts: 47, 62
Omni
Family
Health
Center
Omni
Family
Health
Center
(Route 61 continued on next page)
\
db
W
l I
■ I
==%
I ©
7 2
Ti
1 —
n
1 r T
Mi
CSUB
o G
BAKERSFIELD COLUMBUS & CHESTER & W. CSUB COLUMBUS
© G
ROUTE 61 DAILY SCHEDULE

NORTHBOUND BAKERSFIELD COLLEGE/STINE HARRIS

NORTHBOUND STINE HARRIS/BAKERSFIELD COLLEGE

WALMART NW

PROMENADE
5:23 PM
6:23 PM
5:45 PM
6:45 PM

WALMART NW

PROMENADE
5:34 PM
6:34 PM

HARRIS &

GOSFORD
6:00 PM
7:00 PM
2:45 PM
3:45 PM
N. CHESTER
& ROBERTS
3:00 PM
4:00 PM
5:00 PM
6:00 PM
3:45 PM
4:45 PM
4:00 PM
5:00 PM
3:20 PM
4:20 PM
5:20 PM
6:20 PM

HARRIS &

GOSFORD
3:05 PM
4:05 PM
3:23 PM
4:23 PM
3:34 PM
4:34 PM
7:10 AM
8:10 AM
9:10 AM
10 AM
10 AM
10 PM

RIVER &

COLUMBUS
10 11
12 2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
4:28 PM
5:28 PM
6:28 PM
2:28 PM
3:28 PM
4:28 PM
5:28 PM
6:28 PM
2:36 PM
3:36 PM
4:36 PM
5:36 PM
6:36 PM
4:20 PM
5:20 PM
6:20 PM
7:28 AM
8:28 AM
9:28 AM
10:28 AM
11:28 AM
12:28 PM
1:28 PM
2:28 PM
3:28 PM
1:10 PM
2:10 PM
3:10 PM
4:10 PM
5:10 PM
6:10 PM
7:45 AM
8:45 AM
9:45 AM
10:45 AM
11:45 AM
12:45 PM
1:45 PM
7:28 AM
8:28 AM
9:28 AM
10:28 AM
11:28 AM
12:28 PM
1:28 PM
7:36 AM
8:36 AM
9:36 AM
10:36 AM
11:36 AM
12:36 PM
1:36 PM
6:47 AM
7:47 AM
8:47 AM
9:47 AM
10:47 AM
11:47 AM
12:47 PM
1:47 PM
2:47 PM
3:47 PM
4:47 PM
7:20 AM
8:20 AM
9:20 AM
10:20 AM
11:20 AM
12:20 PM
1:20 PM
2:20 PM
3:20 PM
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
7:17 AM
8:17 AM
9:17 AM
10:17 AM
11:17 AM
12:17 PM
1:17 PM
2:17 PM
3:17 PM
4:17 PM
5:17 PM
6:17 PM
4:45 PM
5:45 PM
6:45 PM
5:05 PM
6:05 PM
7:05 PM
5:47 PM
6:47 PM
This route operates on all holidays except Thanksgiving and Christmas. Operates the same schedule as Saturdays and Sundays only on the holidays listed on the website. Esta ruta opera todos los dias de fiesta, excepto el Dia de Accion de Gracias y Navidad. Opera el mismo horario como los sabados y los domingos. Vease en la pagina de web para una lista de estos dias.

STINE &
HARRIS
o
COFFEE
& OLIVE
©
RIVER
O

COFFEE &
OLIVE
G
7:13 AM
8:13 AM
9:13 AM
10:13 AM
11:13 AM
12:13 PM
1:13 PM
2:13 PM
3:13 PM
4:13 PM
5:13 PM
6:13 PM

COLLEGE
0 G
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM

OLIVE &

AIRPORT
G

BAKERSFIELD

COLLEGE
©
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM

STINE &
HARRIS
G
7:20 AM
8:20 AM
9:20 AM
10:20 AM
11:20 AM
12:20 PM
1:20 PM
2:20 PM
G
7:14 AM
8:14 AM
9:14 AM
10:14 AM
11:14 AM
12:14 PM
1:14 PM
2:14 PM
3:14 PM
4:14 PM
5:14 PM
6:14 PM

OLIVE &

AIRPORT
G
7:23 AM
8:23 AM
9:23 AM
10:23 AM
11:23 AM
12:23 PM
1:23 PM
2:23 PM
G
7:34 AM
8:34 AM
9:34 AM
10:34 AM
11:34 AM
12:34 PM
1:34 PM
2:34 PM
O
7:45 AM
8:45 AM
9:45 AM
10:45 AM
11:45 AM
12:45 PM
1:45 PM
2:45 PM
G
7:05 AM
8:05 AM
9:05 AM
10:05 AM
11:05 AM
12:05 PM
1:05 PM
2:05 PM
57 Mercy Hospital Convention Center
BakersfieldHigh School
BakersfieldHeartHospital
BakersfieldRehabilitationHospital
FashionPlaza
StockdaleVillage
Valley Plaza
SouthwestMercy Hospital
Marketplace
San Joaquin Community Hospital
O
ld
River Stockdale Hwy
Granite Falls
Jewetat
B
C D E
Shops at River Walk
DowntownTransit Center
D
24th
Rosedale Hwy Rosedale Hwy
Meacham
Palm
Brimhall
Stockdale Hwy Stockdale Hwy
Belle Terrace
Ming Ming
Wilson Wilson
Palm
Hageman
34th
21st
23rd
Truxton
Chester
Golden State
H St
F St
Oak
Buck Owens Bl
Mohawk
Calloway
Clay Patrick Farr
Coffee
Patton
Fruitvale
Verdugo
Jewetta Jewetta
Allen
Buena Vista
Gosford
Ashe
Real Rd
New Stine
Akers
S Chester
S H St
Wible
Camino
Del Rio
California
Costco
BakersfieldChristianHigh School
Liberty High School
CentennialHigh School
Walmart
99 178
58 NORTH
© 10/12 GET
CaliforniaState University Bakersfield
Connections toRts: 21, 22, 61
Connectionsto Rts:22, 42, 43, 45, 8183,84,KRT
A
Bakersfield
Route 82Timepoint - Seeschedule for the timebus departs this stopDirection of bus travelPoint of interest A
82 GET RTE/RUTA
(Route 82 continued on next page)
I
2 oe
2 ♦
I • f
t
(D
n
(
-
4 \
v.

J _
I
1 !
।
*■ ■
CSUB
o
6:55 PM
ROSEDALE @ COSTCO
©
ROUTE 82 DAILY SCHEDULE

EASTBOUND CSUB/DOWNTOWN

WESTBOUND DOWNTOWN/CSUB

JEWETTA ACROSS

FROM LIBERTY HS
5:00 PM
6:00 PM

WALMART NW

PROMENADE

WAL-MART NW

PROMENADE
5:23 PM
6:23 PM
5:35 PM
6:35 PM
5:43 PM
6:43 PM

ALLEN &

ROSEDALE

JEWETTA &

BRIMHALL

DOWNTOWN

TRANSIT CENTER

DOWNTOWN

TRANSIT CENTER

ROSEDALE &

CAMINO DEL RIO
7:36 AM
8:36 AM
9:36 AM
10:36 AM
11:36 AM
12:36 PM
1:36 PM
2:36 PM
3:36 PM
4:36 PM
5:36 PM
6:36 PM
7:23 AM
8:23 AM
9:23 AM
10:23 AM
11:23 AM
12:23 PM
1:23 PM
2:23 PM
3:23 PM
4:23 PM
©
7:47 AM
8:47 AM
9:47 AM
10:47 AM
11:47 AM
12:47 PM
1:47 PM
2:47 PM
3:47 PM
4:47 PM
5:47 PM
6:47 PM

ROSEDALE &
ALLEN
G
7:23 AM
8:23 AM
9:23 AM
10:23 AM
11:23 AM
12:23 PM
1:23 PM
2:23 PM
3:23 PM
4:23 PM
5:23 PM
6:23 PM
G
7:35 AM
8:35 AM
9:35 AM
10:35 AM
11:35 AM
12:35 PM
1:35 PM
2:35 PM
3:35 PM
4:35 PM
G
7:09 AM
8:09 AM
9:09 AM
10:09 AM
11:09 AM
12:09 PM
1:09 PM
2:09 PM
3:09 PM
4:09 PM
5:09 PM
6:09 PM
G
7:15 AM
8:15 AM
9:15 AM
10:15 AM
11:15 AM
12:15 PM
1:15 PM
2:15 PM
3:15 PM
4:15 PM
5:15 PM
6:15 PM
©
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
©
7:00 AM
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
©
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
CSUB
©
8:00 AM
9:00 AM
10:00 AM
11:00 AM
12:00 PM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
6:55 PM
©
7:43 AM
8:43 AM
9:43 AM
10:43 AM
11:43 AM
12:43 PM
1:43 PM
2:43 PM
3:43 PM
4:43 PM
63 Costco
FrontierHigh School
Walmart
Lowe’s
Kohl’s Target
Polo Park
CentennialHigh School
Sillect
Fr
u
i
tval
e
Meach ma
Vista WestContinuationHigh School
Clay Patrick Farr
Way
Granite Falls
24th
34th Golden State
23rd
Rosedale Hwy
Noriega
Hageman
Knights Bridge
Reina
Allen
Trackside
Snow
Olive
Palm
Rosedale Hwy
Kingfisher
21st
TruxtunCalifornia
Palm
Chester
H St
F St
Oak
Buck Owens Blvd
Calloway
Coffee
Luciano
Law
Old Farm Rd
Nan
Patton
Gibson
Wear
Mohawk
Jewetta
Allen
Jewetta
Verdugo Verdugo
Real Rd
Camino
Del Rio
99 NORTH
© 10/12 GET
Bakersfield
A
B
C D
E
Connections to Rts:22, 42, 43, 45, 8182, 83, 92, KRT
DowntownTransit Center
MeadowsFieldAirport
Mercy Hospital
BakersfieldHigh School
San Joaquin Community Hospital Bakersfield Heart
Hospital
BakersfieldRehabilitationHospital
CorrectionsDept
Route 84Timepoint - Seeschedule for the timebus departs this stopDirection of bus travelPoint of interest A
84 GET RTE/RUTA
(Route 84 continued on next page)
)
v
o (e 0 /
0 4
v.
$
1♦
I • f
/
-
o 0 0 0 0
PM

ROSEDALE & COSTCO
0 0 00 ©
ROUTE 84 DAILY SCHEDULE

EASTBOUND FRONTIER HIGH SCHOOL/DOWNTOWN

WESTBOUND DOWNTOWN/FRONTIER HIGH SCHOOL
2:21
3:51
5:21
6:51

WALMART NW

PROMENADE

OLD FARM
& HAGEMAN

WAL-MART NW

PROMENADE
PM
PM
PM
7:50 AM
9:20 AM
10:50 AM
12:20 PM
1:50 PM
3:20 PM
4:50 PM
6:20 PM

DOWNTOWN

TRANSIT CENTER

DOWNTOWN

TRANSIT CENTER
7:58 AM
9:28 AM
10:58 AM
12:28 PM
1:58 PM
3:28 PM
4:58 PM
6:28 PM
7:58 AM
9:28 AM
10:58 AM
12:28 PM
1:58 PM
3:28 PM
4:58 PM
6:28 PM
7:15 AM
8:45 AM
10:15 AM
11:45 AM
1:15 PM
2:45 PM
4:15 PM
5:45 PM

OLD FARM &

KINGFISHER
8:07 AM
9:37 AM
11:07 AM
12:37 PM
2:07 PM
3:37 PM
5:07 PM
6:37 PM
8:21 AM
9:51 AM
11:21 AM
12:51 PM
7:38 AM
9:08 AM
10:38 AM
12:08 PM
1:38 PM
3:08 PM
4:38 PM
6:08 PM
7:24 AM
8:54 AM
10:24 AM
11:54 AM
1:24 PM
2:54 PM
4:24 PM
5:54 PM
8:45 AM
10:15 AM
11:45 AM
1:15 PM
2:45 PM
4:15 PM
5:45 PM
7:10 PM
8:32 AM
10:02 AM
11:32 AM
1:02 PM
2:32 PM
4:02 PM
5:32 PM
7:02 PM

ROSEDALE &

CAMINO DEL RIO
ALLEN @ FRONTIER

HIGH SCHOOL
ALLEN @ FRONTIER

HIGH SCHOOL
Appendix L. Vehicle Miles Traveled
1 t +1 213 267 2332 | f +1 213 318 0744
[email protected] | www.gentecsol.com
11845 W Olympic Blvd. 11th Floor, Los Angeles, CA 90064 GTS | General Technologies and Solutions

MEMORANDUM
Date: May 5, 2026 GTS: 251009
To: Integrated Engineering Group (IEG)
From: Rawad Hani, GTS
Subject: Vehicle Miles Traveled (VMT) Analysis
Riverview Market Commercial Development, City of Bakersfield, CA This memorandum describes the development of vehicle miles traveled (VMT) analysis for the proposed Riverview Market Commercial Development (project) in the City of Bakersfield (City), Kern County (County), CA.

The project is located on the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road in the northwestern portion of the City of Bakersfield, Kern County.

The project site is approximately 46-acres and is currently undeveloped. The project proposes to develop the following land uses shown in Table 1 in two separate phases. However, both phases were combined for the purposes of the VMT analysis.

The VMT analysis evaluated the project using the 2020 and 2046 model years of the Kern Council of Governments’ (Kern COG’s)’s San Joaquin Valley Model Improvement Program Phase 3 (VMIP III) model obtained from Kern COG which is the most recent version of the travel model.

Table 1: Riverview Market – Project Land uses
Land use Category Quantity Units1
Shopping Center – Phase I 244.417 TSF
Medical Office 9.129 TSF
Drive-thru restaurants 16.884 TSF
Automated Carwash 4.100 TSF
Public Storage 40.000 TSF
Gas Filling Station 40 VFP
Shopping Center - Phase II 89.818 TSF

1. TSF: Thousand Square Feet / VFP: Vehicle Fueling Positions Background
On December 28, 2018, the California Office of Administrative Law cleared the revised California Environmental Quality Act (CEQA) guidelines for use. Among the changes to the guidelines was removal of vehicle delay and level of service from consideration under CEQA. With the adopted guidelines, transportation impacts are to be evaluated based on a project’s effect on vehicle miles traveled (VMT). -8
Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
2 Methodology
The City is yet to adopt its own Senate Bill 743 (SB 743) guidelines and so, the VMT analysis was conducted using the methodology and significant threshold criteria identified in the California Governor’s Office of Research and Planning (OPR, currently Governor’s office of Land Use and Climate Innovation) Technical Advisory (TA), dated December 2018.

As shown in Table 1 above, the project consists of multiple non-residential land uses. All of the project land uses except medical office can be considered as retail land uses. Even medical office building land use can be considered as a retail use for the purposes of the VMT analysis as majority of trips and VMT is generated by its customers similar to retail. However, for the purposes of VMT analysis, the project medical office use was evaluated using VMT per employee metric.

According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric is the change in total roadway VMT within the defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “with project” scenario is higher than the VMT estimated for the “without project” scenario.

Also, OPR TA recommends use of VMT per employee to evaluate office land uses. An office project is considered to generate a significant impact if the project VMT per employee is greater than 85% of regional baseline average.

Similarly, the OPR TA recommends using a region for VMT analysis purposes that is estimated to contain majority of the project land use trips, and thereby VMT. Given the project’s location and size, it was determined that Kern County can be used as the region for the purposes of project VMT evaluation.

Therefore, the project retail uses would have a significant impact if there is a net increase in roadway VMT within Kern County between “with project” and “without project” scenarios and project medical office would have a significant impact if the project VMT per employee is greater than 85% of Kern County’s baseline average VMT per employee
The OPR TA also includes multiple screening criteria which were reviewed for project evaluation. This project was compared with screening criteria established in the OPR TA to check if the project can be screened out of a detailed VMT analysis. Evaluation of the screening criteria is described below:

Small Project: Based on OPR TA, projects that generate less than 110 daily trips can be considered as small projects and can be screened out of detailed VMT analysis. However, based on project trip generation, the project will generate approximately 15,000 daily trips which is more than 110. Therefore, the project cannot be screened out using this criterion.

Map-Based Screening for Residential and Office Projects: As noted previously, the City has yet to adopt its own SB 743 implementation guidelines. Jurisdictions that have adopted VMT guidelines typically provide existing low-VMT screening maps. Residential and office projects located in these low-VMT areas, and that share similar characteristics, are generally expected to generate comparably low VMT and can therefore be screened out from further analysis. In this case, however, the project consists of retail uses and no official screening maps are available. As a result, this screening criterion does not apply to the project.

Local-Serving Retail: The OPR TA recommends that retail uses under 50,000 square feet may be considered local-serving and can be screened out from a detailed VMT analysis. However, as shown in Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
3 Table 1, the proposed project includes more than 50,000 square feet of retail space. Therefore, this screening criterion does not apply to the project.

Other Screening Criteria: Similarly, OPR TA recommends that public-serving institutional uses and affordable housing be screened out from detailed VMT analysis. Because the proposed project does not include affordable housing or public institutional uses, this screening criterion is not applicable to the project.

As described above, the entire project doesn’t meet any of the screening criteria identified in the OPR TA. Hence, a full VMT analysis was conducted using the most recent version of Kern COG VMIP III model.

Model Approach
Kern COG VMIP III is a socioeconomic data-based model and so the project land uses must be converted into model socioeconomic data categories for modeling purposes. The Institute of Transportation Engineers (ITE), Trip Generation manual was used to convert the project land uses’ square footage into number of employees. The ITE Trip Generation manual includes trips for land uses by different/multiple units (e.g., TSF, employees, rooms). For example, the ITE manual includes trip rates by both square footage and number of employees for project’s land uses. Trip rates for both square footage and number of employees from the manual were used to estimate number of employees for thousand square foot of land use which in turn was used to estimate total project employees. All project land uses were converted into employment based on ITE conversion process except the automated carwash. Project-specific employment data for the proposed carwash was unavailable, and standard sources such as the ITE Trip Generation Manual do not provide employment estimates for this land use. Accordingly, a planning level assumption was applied, consisting of two employees per shift, two shifts per day, and one manager, for a total of five employees used for VMT modeling purposes An estimated total of 5 employees was used for the automated carwash (4.1 TSF). The model socioeconomic datasets for both 2020 and 2046 scenarios were updated to include estimated project employment in the project zones. The following Table 2 shows the employment conversion factors and total employment for the project land uses.

Table 2: Riverview Market – Project Employment Estimation Land use Category Quantity Units
Employees
per Land
Use Unit
Total
Employe
es
Model
Employment
Category
Shopping Center 244.417 TSF 2.12 519 Retail
Medical Office 9.129 TSF 4.13 38 Medical
Drive-thru restaurants 16.884 TSF 10.50 177 Food Industry Automated Carwash 4.100 TSF n/a 5 Retail
Public Storage 40.000 TSF 0.34 14 Industrial
Gas Filling Station 40 VFP 0.62 25 Retail
Shopping Center - Phase II 89.818 TSF 2.12 191 Retail
Total 969
Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
4 Typically, project VMT is calculated by isolating the project in a new TAZ or multiple TAZs depending on the diversity of project land uses and project size. Since VMIP III allows zone splits/ addition of new TAZs, multiple TAZ (7 TAZs) were used to model different land use types of the project. Given retail land uses are evaluated using roadway VMT, they do not require isolation of land uses in the model. However, the project land uses were separated into their own TAZs to develop project trip distribution using select zone model runs.

Both baseline (2020) and horizon year (2046) model runs were used to estimate project’s VMT impacts.

No project specific network modifications were conducted for neither base nor horizon scenarios. Full model runs with feedback loops were conducted for all of the project scenarios.

It should be noted that the cumulative (2046) scenario was modeled using a “zero-sum” approach. This method maintains the same regional control totals as the cumulative “no project” scenario by reallocating, or reducing, land uses in other growth areas to accommodate the project site. Project-specific land use and employment inputs by TAZ were provided to Kern COG for developing the zero-sum socioeconomic dataset. Kern COG subsequently adjusted the cumulative scenario to incorporate the project’s employment while keeping the overall regional control totals consistent with the adopted 2046 regional forecast.

VMT Analysis
As noted previously, the OPR TA recommends evaluating retail projects using the net change in total VMT between the “with project” and “without project” scenarios. A retail project is considered to result in a significant impact if it generates a net increase in roadway VMT within Kern County under the “with project” conditions relative to the “without project” scenario.

Table 3 below presents the total roadway VMT within Kern County for both scenarios under the base year (2020) and cumulative/horizon year (2046) conditions. The total roadway VMT for Year 2028 values (with and without project VMT) were estimated using linear interpolation of 2020 and 2046 VMT numbers.

Table 3: Riverview Market – Project VMT evaluation (retail land uses) Daily Countywide
Roadway VMT With Project (a) Without Project (b)
Difference
(c = a - b) % Difference
2020 30,554,590 30,503,375 51,215 0.17%
2028 32,624,519 32,582,785 41,733 0.13%
2046 37,281,858 37,261,458 20,399 0.05%
Medical Office evaluation: The OPR Technical Advisory recommends using VMT per employee as the appropriate metric for evaluating office land uses. Under this guidance, an office project would result in a significant impact if its VMT per employee exceeds 85 percent of the regional baseline average.

Consistent with the retail analysis, Kern County was defined as the region for this evaluation. Accordingly, Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
5 the project’s medical office component would be considered to have a significant impact if its VMT per employee is greater than 85 percent of the Kern County baseline average.

Table 4 below presents the VMT per employee estimates for the project’s medical office use.

Table 4: Riverview Market – Project Medical Office VMT evaluation 2020
Project (Medical
Office) Kern County
Kern County
Threshold*
Total Employees (non-retail) (d) 38 339,500
Homebased Work (HBW) VMT (e) 571 5,609,069
HBW VMT per employee (f=e/d) 15.13 16.52 14.04
Percentage above threshold 7.76%
* Estimated using "No project" base year (2020) model run. 85% of baseline regional average Active Transportation VMT Reductions
As the Project incorporates and expands active transportation facilities for pedestrians and bicyclists, the VMT analysis accounts for potential VMT reductions associated with these improvements. However, conventional travel demand models are not well suited to quantify VMT reductions resulting from localized mode shift attributable to enhanced active transportation infrastructure. Accordingly, supplemental off-model calculations were conducted to estimate VMT reductions associated with the proposed Project improvements.

These off-model calculations follow the methodologies and default assumptions outlined in the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (October 2024). The applicable measures and corresponding assumptions are summarized below.

End-of-Trip Bicycle Facilities
The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers. Consistent with CAPCOA Measure T-10, Provide End-of-Trip Bicycle Facilities, the provision of these facilities can achieve a reduction in employee commute VMT corresponding to a 0.1 percent to 4.4 percent reduction in greenhouse gas emissions.

Pedestrian Network Improvements
The Project proposes new sidewalks along its frontages, improving pedestrian connectivity and walkability. Based on CAPCOA Measure T-18, Provide Pedestrian Network Improvements, the provision Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
6 of sidewalks and an enhanced pedestrian network can result in up to a 6.4 percent reduction in greenhouse gas emissions associated with household vehicle travel at the plan or community level.

Bicycle Facility Improvements
The Project proposes a new bicycle lane along Rosedale Drive, extending an existing facility and improving overall bicycle network connectivity. Consistent with CAPCOA Measure T-19-A, Construct or Improve Bicycle Facility, this improvement can achieve up to a 0.8 percent reduction in greenhouse gas emissions from displaced vehicle travel on roadways parallel to the bicycle facility. In addition, CAPCOA Measure T-19-B, Construct or Improve Bike Boulevard, indicates that bicycle-oriented corridor enhancements can result in up to a 0.2 percent reduction in greenhouse gas emissions from displaced vehicle travel.

Conclusion
The vehicle miles traveled (VMT) analysis for the proposed Riverview Market Commercial Development was conducted in accordance with the Governor’s Office of Planning and Research (OPR) Technical Advisory and utilizes the most recent Kern Council of Governments VMIP III travel demand model. The analysis demonstrates that the project would result in a net increase in countywide roadway VMT under both existing and cumulative conditions, and that the project’s medical office component would exceed the applicable VMT per employee threshold. Accordingly, the project would result in a significant transportation impact under CEQA.

The project has been designed to incorporate feasible VMT reducing strategies consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with CAPCOA methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent.

These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the project’s location and operational characteristics.

The project site is situated within an established and planned commercial corridor in close proximity to existing and planned residential neighborhoods, as well as other commercial and service uses. Given this context, the proposed development would introduce additional retail, dining, and service options within a relatively short distance of surrounding compatible land uses, which may facilitate shorter trips and increase the potential for internal capture and linked trips. The project would also complement nearby development by broadening the range of goods and services available locally, which could reduce the need for some longer-distance trips to other areas of the City or County. While these factors do not eliminate the identified VMT impact, they reflect the project’s contribution to enhancing the availability of services within the local community.

Appendix H-2
Vehicle Miles Traveled (VMT) Analysis

^^Horn
1 t +1 213 267 2332 | f +1 213 318 0744
[email protected] | www.gentecsol.com
11845 W Olympic Blvd. 11th Floor, Los Angeles, CA 90064 GTS | General Technologies and Solutions

MEMORANDUM
Date: May 5, 2026 GTS: 251009
To: Integrated Engineering Group (IEG)
From: Rawad Hani, GTS
Subject: Vehicle Miles Traveled (VMT) Analysis
Riverview Market Commercial Development, City of Bakersfield, CA This memorandum describes the development of vehicle miles traveled (VMT) analysis for the proposed Riverview Market Commercial Development (project) in the City of Bakersfield (City), Kern County (County), CA.

The project is located on the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road in the northwestern portion of the City of Bakersfield, Kern County.

The project site is approximately 46-acres and is currently undeveloped. The project proposes to develop the following land uses shown in Table 1 in two separate phases. However, both phases were combined for the purposes of the VMT analysis.

The VMT analysis evaluated the project using the 2020 and 2046 model years of the Kern Council of Governments’ (Kern COG’s)’s San Joaquin Valley Model Improvement Program Phase 3 (VMIP III) model obtained from Kern COG which is the most recent version of the travel model.

Table 1: Riverview Market – Project Land uses
Land use Category Quantity Units1
Shopping Center – Phase I 244.417 TSF
Medical Office 9.129 TSF
Drive-thru restaurants 16.884 TSF
Automated Carwash 4.100 TSF
Public Storage 40.000 TSF
Gas Filling Station 40 VFP
Shopping Center - Phase II 89.818 TSF

1. TSF: Thousand Square Feet / VFP: Vehicle Fueling Positions Background
On December 28, 2018, the California Office of Administrative Law cleared the revised California Environmental Quality Act (CEQA) guidelines for use. Among the changes to the guidelines was removal of vehicle delay and level of service from consideration under CEQA. With the adopted guidelines, transportation impacts are to be evaluated based on a project’s effect on vehicle miles traveled (VMT). -8
Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
2 Methodology
The City is yet to adopt its own Senate Bill 743 (SB 743) guidelines and so, the VMT analysis was conducted using the methodology and significant threshold criteria identified in the California Governor’s Office of Research and Planning (OPR, currently Governor’s office of Land Use and Climate Innovation) Technical Advisory (TA), dated December 2018.

As shown in Table 1 above, the project consists of multiple non-residential land uses. All of the project land uses except medical office can be considered as retail land uses. Even medical office building land use can be considered as a retail use for the purposes of the VMT analysis as majority of trips and VMT is generated by its customers similar to retail. However, for the purposes of VMT analysis, the project medical office use was evaluated using VMT per employee metric.

According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric is the change in total roadway VMT within the defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “with project” scenario is higher than the VMT estimated for the “without project” scenario.

Also, OPR TA recommends use of VMT per employee to evaluate office land uses. An office project is considered to generate a significant impact if the project VMT per employee is greater than 85% of regional baseline average.

Similarly, the OPR TA recommends using a region for VMT analysis purposes that is estimated to contain majority of the project land use trips, and thereby VMT. Given the project’s location and size, it was determined that Kern County can be used as the region for the purposes of project VMT evaluation.

Therefore, the project retail uses would have a significant impact if there is a net increase in roadway VMT within Kern County between “with project” and “without project” scenarios and project medical office would have a significant impact if the project VMT per employee is greater than 85% of Kern County’s baseline average VMT per employee
The OPR TA also includes multiple screening criteria which were reviewed for project evaluation. This project was compared with screening criteria established in the OPR TA to check if the project can be screened out of a detailed VMT analysis. Evaluation of the screening criteria is described below:

Small Project: Based on OPR TA, projects that generate less than 110 daily trips can be considered as small projects and can be screened out of detailed VMT analysis. However, based on project trip generation, the project will generate approximately 15,000 daily trips which is more than 110. Therefore, the project cannot be screened out using this criterion.

Map-Based Screening for Residential and Office Projects: As noted previously, the City has yet to adopt its own SB 743 implementation guidelines. Jurisdictions that have adopted VMT guidelines typically provide existing low-VMT screening maps. Residential and office projects located in these low-VMT areas, and that share similar characteristics, are generally expected to generate comparably low VMT and can therefore be screened out from further analysis. In this case, however, the project consists of retail uses and no official screening maps are available. As a result, this screening criterion does not apply to the project.

Local-Serving Retail: The OPR TA recommends that retail uses under 50,000 square feet may be considered local-serving and can be screened out from a detailed VMT analysis. However, as shown in Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
3 Table 1, the proposed project includes more than 50,000 square feet of retail space. Therefore, this screening criterion does not apply to the project.

Other Screening Criteria: Similarly, OPR TA recommends that public-serving institutional uses and affordable housing be screened out from detailed VMT analysis. Because the proposed project does not include affordable housing or public institutional uses, this screening criterion is not applicable to the project.

As described above, the entire project doesn’t meet any of the screening criteria identified in the OPR TA. Hence, a full VMT analysis was conducted using the most recent version of Kern COG VMIP III model.

Model Approach
Kern COG VMIP III is a socioeconomic data-based model and so the project land uses must be converted into model socioeconomic data categories for modeling purposes. The Institute of Transportation Engineers (ITE), Trip Generation manual was used to convert the project land uses’ square footage into number of employees. The ITE Trip Generation manual includes trips for land uses by different/multiple units (e.g., TSF, employees, rooms). For example, the ITE manual includes trip rates by both square footage and number of employees for project’s land uses. Trip rates for both square footage and number of employees from the manual were used to estimate number of employees for thousand square foot of land use which in turn was used to estimate total project employees. All project land uses were converted into employment based on ITE conversion process except the automated carwash. Project-specific employment data for the proposed carwash was unavailable, and standard sources such as the ITE Trip Generation Manual do not provide employment estimates for this land use. Accordingly, a planning level assumption was applied, consisting of two employees per shift, two shifts per day, and one manager, for a total of five employees used for VMT modeling purposes An estimated total of 5 employees was used for the automated carwash (4.1 TSF). The model socioeconomic datasets for both 2020 and 2046 scenarios were updated to include estimated project employment in the project zones. The following Table 2 shows the employment conversion factors and total employment for the project land uses.

Table 2: Riverview Market – Project Employment Estimation Land use Category Quantity Units
Employees
per Land
Use Unit
Total
Employe
es
Model
Employment
Category
Shopping Center 244.417 TSF 2.12 519 Retail
Medical Office 9.129 TSF 4.13 38 Medical
Drive-thru restaurants 16.884 TSF 10.50 177 Food Industry Automated Carwash 4.100 TSF n/a 5 Retail
Public Storage 40.000 TSF 0.34 14 Industrial
Gas Filling Station 40 VFP 0.62 25 Retail
Shopping Center - Phase II 89.818 TSF 2.12 191 Retail
Total 969
Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
4 Typically, project VMT is calculated by isolating the project in a new TAZ or multiple TAZs depending on the diversity of project land uses and project size. Since VMIP III allows zone splits/ addition of new TAZs, multiple TAZ (7 TAZs) were used to model different land use types of the project. Given retail land uses are evaluated using roadway VMT, they do not require isolation of land uses in the model. However, the project land uses were separated into their own TAZs to develop project trip distribution using select zone model runs.

Both baseline (2020) and horizon year (2046) model runs were used to estimate project’s VMT impacts.

No project specific network modifications were conducted for neither base nor horizon scenarios. Full model runs with feedback loops were conducted for all of the project scenarios.

It should be noted that the cumulative (2046) scenario was modeled using a “zero-sum” approach. This method maintains the same regional control totals as the cumulative “no project” scenario by reallocating, or reducing, land uses in other growth areas to accommodate the project site. Project-specific land use and employment inputs by TAZ were provided to Kern COG for developing the zero-sum socioeconomic dataset. Kern COG subsequently adjusted the cumulative scenario to incorporate the project’s employment while keeping the overall regional control totals consistent with the adopted 2046 regional forecast.

VMT Analysis
As noted previously, the OPR TA recommends evaluating retail projects using the net change in total VMT between the “with project” and “without project” scenarios. A retail project is considered to result in a significant impact if it generates a net increase in roadway VMT within Kern County under the “with project” conditions relative to the “without project” scenario.

Table 3 below presents the total roadway VMT within Kern County for both scenarios under the base year (2020) and cumulative/horizon year (2046) conditions. The total roadway VMT for Year 2028 values (with and without project VMT) were estimated using linear interpolation of 2020 and 2046 VMT numbers.

Table 3: Riverview Market – Project VMT evaluation (retail land uses) Daily Countywide
Roadway VMT With Project (a) Without Project (b)
Difference
(c = a - b) % Difference
2020 30,554,590 30,503,375 51,215 0.17%
2028 32,624,519 32,582,785 41,733 0.13%
2046 37,281,858 37,261,458 20,399 0.05%
Medical Office evaluation: The OPR Technical Advisory recommends using VMT per employee as the appropriate metric for evaluating office land uses. Under this guidance, an office project would result in a significant impact if its VMT per employee exceeds 85 percent of the regional baseline average.

Consistent with the retail analysis, Kern County was defined as the region for this evaluation. Accordingly, Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
5 the project’s medical office component would be considered to have a significant impact if its VMT per employee is greater than 85 percent of the Kern County baseline average.

Table 4 below presents the VMT per employee estimates for the project’s medical office use.

Table 4: Riverview Market – Project Medical Office VMT evaluation 2020
Project (Medical
Office) Kern County
Kern County
Threshold*
Total Employees (non-retail) (d) 38 339,500
Homebased Work (HBW) VMT (e) 571 5,609,069
HBW VMT per employee (f=e/d) 15.13 16.52 14.04
Percentage above threshold 7.76%
* Estimated using "No project" base year (2020) model run. 85% of baseline regional average Active Transportation VMT Reductions
As the Project incorporates and expands active transportation facilities for pedestrians and bicyclists, the VMT analysis accounts for potential VMT reductions associated with these improvements. However, conventional travel demand models are not well suited to quantify VMT reductions resulting from localized mode shift attributable to enhanced active transportation infrastructure. Accordingly, supplemental off-model calculations were conducted to estimate VMT reductions associated with the proposed Project improvements.

These off-model calculations follow the methodologies and default assumptions outlined in the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (October 2024). The applicable measures and corresponding assumptions are summarized below.

End-of-Trip Bicycle Facilities
The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers. Consistent with CAPCOA Measure T-10, Provide End-of-Trip Bicycle Facilities, the provision of these facilities can achieve a reduction in employee commute VMT corresponding to a 0.1 percent to 4.4 percent reduction in greenhouse gas emissions.

Pedestrian Network Improvements
The Project proposes new sidewalks along its frontages, improving pedestrian connectivity and walkability. Based on CAPCOA Measure T-18, Provide Pedestrian Network Improvements, the provision Riverview Market, City of Bakersfield, CA
Vehicle Miles Traveled (VMT) Analysis
6 of sidewalks and an enhanced pedestrian network can result in up to a 6.4 percent reduction in greenhouse gas emissions associated with household vehicle travel at the plan or community level.

Bicycle Facility Improvements
The Project proposes a new bicycle lane along Rosedale Drive, extending an existing facility and improving overall bicycle network connectivity. Consistent with CAPCOA Measure T-19-A, Construct or Improve Bicycle Facility, this improvement can achieve up to a 0.8 percent reduction in greenhouse gas emissions from displaced vehicle travel on roadways parallel to the bicycle facility. In addition, CAPCOA Measure T-19-B, Construct or Improve Bike Boulevard, indicates that bicycle-oriented corridor enhancements can result in up to a 0.2 percent reduction in greenhouse gas emissions from displaced vehicle travel.

Conclusion
The vehicle miles traveled (VMT) analysis for the proposed Riverview Market Commercial Development was conducted in accordance with the Governor’s Office of Planning and Research (OPR) Technical Advisory and utilizes the most recent Kern Council of Governments VMIP III travel demand model. The analysis demonstrates that the project would result in a net increase in countywide roadway VMT under both existing and cumulative conditions, and that the project’s medical office component would exceed the applicable VMT per employee threshold. Accordingly, the project would result in a significant transportation impact under CEQA.

The project has been designed to incorporate feasible VMT reducing strategies consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with CAPCOA methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent.

These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the project’s location and operational characteristics.

The project site is situated within an established and planned commercial corridor in close proximity to existing and planned residential neighborhoods, as well as other commercial and service uses. Given this context, the proposed development would introduce additional retail, dining, and service options within a relatively short distance of surrounding compatible land uses, which may facilitate shorter trips and increase the potential for internal capture and linked trips. The project would also complement nearby development by broadening the range of goods and services available locally, which could reduce the need for some longer-distance trips to other areas of the City or County. While these factors do not eliminate the identified VMT impact, they reflect the project’s contribution to enhancing the availability of services within the local community.

Appendix I
Utilities and Hydrology

Appendix I-1
Water Supply and Demand Analysis

Kl^ley>»HOrn
May 2026
Water Supply and Demand Analysis
Coffee and Rosedale Commercial Retail
Development Project
for City of Bakersfield
Prepared for:

City of Bakersfield
Contact: Roque Nino
1715 Chester Avenue,
Bakersfield, California 93301
Project Number:

LOKH-01
Prepared by:

PlaceWorks
Dina El Chammas Gass, P.E. Senior Engineer
3 MacArthur Place, Suite 1100
Santa Ana, CA 92707
88PLACEWORKS
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page ii

1. Introduction .................................................................................................................................................... 1

1.1 INTRODUCTION .............................................................................................................................. 1

1.2 SITE LOCATION AND PROJECT DESCRIPTION ................................................................ 1

2. Water Supply and Demand Analysis ............................................................................................................ 9

2.1 WATER SYSTEM DESCRIPTION ................................................................................................. 9

2.2 GROUNDWATER ............................................................................................................................ 10

2.3 FUTURE WATER PROJECTS ....................................................................................................... 10

2.4 WATER DEMAND ANALYSIS .................................................................................................... 11

2.4.1 Project Water Demands ...................................................................................................... 11

2.4.2 City of Bakersfield Water Demands ................................................................................. 12

2.5 WATER SUPPLY AND DEMAND ANALYSIS ........................................................................ 12

2.6 WATER SHORTAGE CONTINGENCY PLAN ....................................................................... 15

2.7 DEMAND MANAGEMENT MEASURES ................................................................................ 15

2.8 SUMMARY .......................................................................................................................................... 16

3. References ................................................................................................................................................... 17 Tables Page
Table 1 – Proposed Building Space ................................................................................................................................. 2 Table 2 – Proposed Project Water Demand ................................................................................................................ 11 Table 3 – Current and Projected Potable Water Demands for the Domestic Water System (afy) ..................... 12 Table 4 – Current and Projected Potable Water Demands for the Wholesale Water System (afy) .................... 12 Table 5 – Actual Water Supplies for the Domestic Water System (afy) .................................................................. 13 Table 6 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy) .............................................................................................................................. 13 Figures Page
Figure 1 Local Vicinity ........................................................................................................................................ 3 Figure 2 Aerial View ............................................................................................................................................ 5 Figure 3 Conceptual Site Plan............................................................................................................................ 7 March 2026 PlaceWorks • Page 1

1. Introduction

1.1 INTRODUCTION
This water supply and demand analysis has been prepared for the City of Bakersfield to calculate the water demand for the Coffee and Rosedale Commercial Retail Development project (“proposed project”) and the adequacy of water supplies to serve the proposed project. Although the proposed project does not meet the criterion that requires the preparation of a Water Supply Assessment1, this analysis is provided to ensure that the water demand of the proposed project can be met by the water purveyor. The proposed project consists of a mix of commercial uses, landscaping, surface parking areas and drive aisles, vehicular and pedestrian access and circulation improvements, and utility improvements.

The analysis assesses the adequacy of water supplies to meet the proposed project’s water demand in addition to future water demands within the City of Bakersfield’s service area. The analysis documents whether the City’s total projected water supplies for normal, single dry, and multiple dry water years over a 20-year period will meet the proposed project’s projected water demand as well as future service area demands.

1.2 SITE LOCATION AND PROJECT DESCRIPTION
The approximately 46-acre (46.16 acres) project site is an undeveloped L-shaped property. It is bounded by Rosedale Highway (SR-58) to the north, Coffee Road to the east, vacant land and a Pacific Gas and Electric (PG&E) substation to the south, and El Toro Viejo Road and a PG&E substation to the east (see Figure 1, Local Vicinity, and Figure 2, Aerial View). The project site is in the northwestern portion of the City of Bakersfield, Kern County. There are no current known street addresses associated with the project site; however, the former PG&E Kern Power Plant (i.e., included project site plus larger area) was known by 2401 Coffee Road, Bakersfield, California 93308.

The proposed project involves construction and operation of the Coffee and Rosedale Commercial Retail Development project that would encompass 405,531 square feet (SF) of total building space, as shown in Table

1. Table 1 also provides a breakdown of the proposed uses and related square footages. Figure 3, Conceptual Site Plan, illustrates the layout and improvements of the proposed project. The proposed project also includes 379,446 SF of landscaping.
1 Commercial projects that require a Water Supply Assessment pursuant to Senate Bill 610 include:
• A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
• A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.

The proposed project does not fall under these categories.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 2
Table 1 – Proposed Building Space
Proposed Land Uses Square Footage
Retail 268,082
Restaurant 31,796
Express Car Wash 4,100
Drive-Thru/Restaurants 16,495
Health Club 24,993
Medical Office 8,996
Bank 9,120
Electric and Fire Riser Rooms 1,949
Public Storage 40,000
Total 405,531
Project buildout is anticipated to occur over 20 to 22-month timeframe, commencing in early 2026 and ending in late-2027.

PlaceWorks
Figure 1 - Local Vicinity

WATER SUPPLY AND DEMAND ANALYSIS - COFFEE AND ROSEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT Source: Generated using ArcMap, Inc., 2023.

CITY OF BAKERSFIELD
0 Scale (Feet)
2,000
Note: Unincorporated county areas are shown in white.

Project Boundary
Coffee Rd
Rosedale Hwy
El Toro Viejo Rd
Hageman Rd
Fruitvale Ave
Calloway Dr
Brimhall Rd
Westside Pkwy Truxtun Ave
Calloway Canal
Kern River
Railroad
Jet Wy
Wedding Ln
Charity Ave
Granite Falls Dr
Meacham Rd Downing Ave
Shellabarger Rd
■
T
| ■■
A I

1.1 — h r ) /
)
—I — a I
—r I
1 1
I
!
i
i
i
. i
i
i =
I
I TD I _
i i; ^•r i
-
I
!. I
I
I
I
__ i Bakersfield "1 J
(I । i
/
II
I
I
I
I
I
I I I
J
T 1 —
!-
I
I
— /
..

I
!
I
I I
i
—J A
I
- I
—
L-—!
I
"l
4V/C
U
“-*—■
I nr
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 4
This page intentionally left blank.

PlaceWorks
Source: Nearmap, Inc., 2022.

WATER SUPPLY AND DEMAND ANALYSIS - COFFEE AND ROSEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
0 Scale (Feet)
500
Figure 2 - Aerial View
Residential
Residential
Commercial
Commercial
Coffee Rd
Rosedale Hwy
Ribston Ave
Wolf River Ave
Bolero A
Mcintosh
Wy
Crispin
St
Pink Lady
Wy
Firant-Kern Canal
Industrial
Commercial
Project Boundary
El Toro Viejo Rd
— — —
nlw; C
1 —"I '106] 1 rafe gi
mSd Aa
ast IE egl P e - mi hre
and ■
I
P, a. wlim y
V
Ti e *
I L
s Je 1
ji (I
wiht 2
y
IS r i ri - —— J auu / motmtonSLer $ IT’E — i
ila= *pppi==B=1) 1
I . . J. f ——1 - L A D
Eatt, . u

LI A , I
"m’teh TDDCmmg)) I
a 1 ======== ■
. -tdeet. • tetete - t
. TImn won
3 I
-it
E 15
S*
I
ikS
___ /
-
al
\t
1i .h
—f 1 - ’
______
goban*.. Ruan I wot 2
r 2 ■
■ " '
—
T
t2e? tt ______
-1-3 | I76ma/l : '
.= 1.5s—e
Tf
—
.s
Dir "EI he
gm-L.

Ri
E
2ve 2*a .nam -esuneran
•;
T 177 - -
dMr 9s iel Jta ccs, J“
seil 0.
r ■:
12 ___
e
t
I 4
i

8. ipe
A —======
colgo ' oe F)
। Ae
-=-------------- —== I
gbin * —S — XAW Lf * IIA%
Athus
2p
T fwgp 11 111
•• •!
r J P] ")l
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 6
This page intentionally left blank.
0 50’ 100’ 200’

WATER SUPPLY AND DEMAND STUDY
TOTAL LANDSCAPE SQUARE FOOTAGE: 328,273 SQUARE FEET

ANTICIPATED LANDSCAPING SQUARE FOOTAGE FOR THE COMMERCIAL RETAIL CENTER : 288,028 SQUARE FEET

ANTICIPATED LANDSCAPING SQUARE FOOTAGE PROPOSED FOR THE OPEN GREEN SPACE: 40,245 SQUARE FEET
MAXIMUM ALLOWED WATER ALLOWANCE (MAWA): 4,799,238 GALLONS PER YEAR

EL TORO VIEJO RD

ROSEDALE HWY

PROPERTY LINE

PROPERTY LINE

PG&E POWER EASEMENT LINE

PROPERTY LINE

PROPERTY LINE

EXISTING PG&E

TRANSMISSION
STATION N.A.P.

STORAGE
BLDG

RESTAURANTS

CAR WASH

RESTAURANT

RESTAURANTS

MAJOR A

HEALTH CLUB

MAJOR B
MARKET

MAJOR C

MAJOR D
RETAIL

MAJOR E
RETAIL

MAJOR F
RETAIL

MAJOR G
RETAIL

MAJOR H
RETAIL

MAJOR I
RETAIL

MAJOR J

RESTAURANT

RESTAURANT
RETAIL
RETAIL

MEDICAL
OFFICE
DRIVE
THRU

RETAIL RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
REST.

GAS STATION

COFFEE RD

RESTAURANTS
& RETAIL
R/W
R/W

R/W R/W R/W R/W
R/W

PG&E POWER EASEMENT LINE PG&E POWER EASEMENT LINE

PG&E EASEMENT

RESTAURANT
0 50’ 100’ 200’

WATER SUPPLY AND DEMAND STUDY
TOTAL LANDSCAPE SQUARE FOOTAGE: 328,273 SQUARE FEET

ANTICIPATED LANDSCAPING SQUARE FOOTAGE FOR THE COMMERCIAL RETAIL CENTER : 288,028 SQUARE FEET

ANTICIPATED LANDSCAPING SQUARE FOOTAGE PROPOSED FOR THE OPEN GREEN SPACE: 40,245 SQUARE FEET
MAXIMUM ALLOWED WATER ALLOWANCE (MAWA): 4,799,238 GALLONS PER YEAR

EL TORO VIEJO RD

ROSEDALE HWY

PROPERTY LINE

PROPERTY LINE

PG&E POWER EASEMENT LINE

PROPERTY LINE

PROPERTY LINE

EXISTING PG&E

TRANSMISSION
STATION N.A.P.

STORAGE
BLDG

RESTAURANTS

CAR WASH

RESTAURANT

RESTAURANTS

MAJOR A

HEALTH CLUB

MAJOR B
MARKET

MAJOR C

MAJOR D
RETAIL

MAJOR E
RETAIL

MAJOR F
RETAIL

MAJOR G
RETAIL

MAJOR H
RETAIL

MAJOR I
RETAIL

MAJOR J

RESTAURANT

RESTAURANT
RETAIL
RETAIL

MEDICAL
OFFICE
DRIVE
THRU

RETAIL RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
REST.

GAS STATION

COFFEE RD

RESTAURANTS
& RETAIL
R/W
R/W

R/W R/W R/W R/W
R/W

PG&E POWER EASEMENT LINE PG&E POWER EASEMENT LINE

PG&E EASEMENT

RESTAURANT
Source: Kimley-Horn 2025.

WATER SUPPLY AND DEMAND ANALYSIS - COFFEE AND ROSDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT PlaceWorks
0 Scale (Feet)
200

CITY OF BAKERSFIELD
Figure 3 - Conceptual Site Plan —
* "
waseneleaseancsgnsts
<
- - -________________________ ■ _ _ __ 44. 1 3 TTHEWE-H-T-H-H------ ...

PWBW
HfhfhmHfhmm- TPh P TT" —moi -
I —T
q
11-
m
L h' T
I I C
- Igi Q Q
h
I
J The A A )i J 41
-€ ■r
)
3 f
—
v MI
I
III life JTTT I III TNi h. O | p TNU 1 111111IV
POllusei T
/
i
/
I .111111^11111
j 13
) -V s
&% WTL >111.111.111.! ___ \
JlDDEC
Ju . I. t
IL
Y)is I*
l - — t d
■ L (
I ! " I “ E
I’I
r
30 I • 2
t ‘
T*
IIIIII
J. ttBtBC
-I
l s
I H
\
4 ■ L
1 F
IM) 8
4 N
I 3[ । ... .(AN
1 L UWILIJ m 1
______
AI
__ __
1 2)
2ie
A
II
I
— ■
f
-- J- .
( C
— 2929 2(00
ini
L
-ty
1 I
4 r TW I /
I
I
L_____
_____
e >
t",
y
nr
J d W... I t
t d t C
m -
।
aug
1I
fCMaWMh “ ■■ ■ UD. d I Js
oorprpramul 2 ' JebeWcIMCTPaiis Lg SSe 4/
k
W-a
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 8
This page intentionally left blank.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks

2. Water Supply and Demand Analysis

2.1 WATER SYSTEM DESCRIPTION
Water service for the proposed project would be provided by the City of Bakersfield. The City’s Water Resources Department operates a Domestic Water System and a Wholesale Water System. The Domestic Water System is a retail water supplier that operates under a service contract with California Water Service (Cal Water).

The service area boundaries for the Domestic Water System include only a portion of the City of Bakersfield.

Remaining areas of the City are served by other retail water suppliers. The primary source of supply for the Domestic Water System is groundwater and recharged surface water pumped from City owned wells. This is supplemented by surface water supplies from treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4’s (KCWA ID4). The surface water conveyed to the treatment water plants is from Kern River supplies and the State Water Project (SWP) supplies. In 2020, the City’s Domestic Water System service area consisted of 48,140 municipal connections and supplied a volume of 45,649 acre-feet (AF).

The City’s Wholesale Water System, which is also operated by the City’s Water Resources Department, oversees the City’s Kern River water rights and water supplies. The service area for this system includes all land within the City’s boundaries. The Kern River water supplies are transported though the Kern River channel and canal systems for delivery to Cal Water’s North Garden and Northeast Bakersfield Water Treatment Plants. The Henry C. Garnett Water Purification Plant receives surface water from the SWP. When SWP supplies are not available, the City is able to deliver its Kern River supplies for treatment in place of SWP supplies. Kern water supplies are also delivered to groundwater replenishment areas such as the City’s 2,800-acre recharge facility.

Kern River water that is replenished to the groundwater basin benefits the City and other retail water suppliers that operate groundwater wells. A volume of 77,528 AF of Kern River surface water was delivered through the Wholesale Water System in 2020.

The City also maintains approximately 400 stormwater basins that capture precipitation and recharge the groundwater basin. These stormwater basins are estimated to capture and recharge 16,000 acre-feet per year (afy) of stormwater runoff on average. Approximately 4,272 afy of additional stormwater runoff is captured and diverted into the Kern River and unlined canals annually. This captured stormwater becomes part of the City’s groundwater and recharged water supplies.

Additionally, wastewater generated within the Domestic Water System service area is collected and transported to the City’s Wastewater Treatment Plant (WWTP) No. 3, which provides undisinfected secondary and tertiary treatment. Undisinfected secondary effluent is stored in percolation ponds and used for agricultural irrigation.

Tertiary treated effluent is used for landscape irrigation on City owned property. WWTP No. 3 serves areas located both within and outside of the Domestic Water System service area.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 10
In 2020, 7,114 AF of undisinfected secondary effluent was delivered for agricultural irrigation use outside of the City’s service area on property owned by the City of Los Angeles. The amount of undisinfected secondary effluent disposed of in percolation ponds at the WWTP No.3 was 12,167 AF. The City used 664 AF of tertiary treated effluent as recycled water for irrigation of landscaping within the Kaiser Permanente Sports Village, a City owned soccer and football complex located within the Domestic Water System service area. On July 17, 2019, the Bakersfield City Council voted not to renew its contract for sale of wastewater for agricultural irrigation use on the farmland owned by the City of Los Angeles when it expires in 2026. This will allow for additional recycled water to be used within the Domestic Water System service area in the future. The City is also planning an expansion of the tertiary treatment capacity at WWTP No. 3 from 2 million gallons per day (MGD) to 8 MGD (City of Bakersflied 2021).

2.2 GROUNDWATER
The City pumps groundwater and recharged surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin by the California Department of Water Resources (DWR).

It is not currently adjudicated.

The City, along with five other agencies, is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County Groundwater Sustainability Plan (GSP) which was adopted by DWR in December of 2024.

The GSP aims to maintain water levels above the Minimum Threshold levels to allow the City’s wells to meet the demands of the Domestic Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality.

The City’s groundwater operations are subject to compliance with the requirements of the GSP.

2.3 FUTURE WATER PROJECTS
Optimization of the City’s Kern River supplies to promote the goals of the GSP involves the full use of the City’s available Kern River entitlement. The Kern River Conjunctive Use Optimization project would be implemented over time so that it can be adjusted to meet changing conditions. The City’s Kern River supplies would be delivered as a first priority to meet demands of the surface water treatment plants with the remaining supplies being recharged to the groundwater basin through the Kern River channel, the 2,800 acre recharge facility, Truxtun Lake, and other City park facilities
Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the California State Water Resources Control Board (SWRCB). The Kern River was designated with Fully Appropriated Status (FAS) by the SWRCB in 1964. However, in February 2010, SWRCB issued an order revising the status of the Kern River, finding that the river was no longer fully appropriated. In anticipation of WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks
this action, the City filed an application with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

The City’s intended use of unappropriated water is to have it remain in the Kern River watercourse to support multiple reasonable and beneficial uses, including domestic purposes, municipal and industrial uses, protection of the public interest, environmental purposes, streamflow restoration, constructed wetlands, recreational uses, fish and wildlife restoration, underground aquifer supply, aquifer water quality enhancement, and underground water banking for drought and other emergencies. The SWRCB has not taken action regarding the allocation of surplus, unappropriated Kern River supplies. It is anticipated that this water may be allocated in about 10 to 15 years. If additional Kern River supplies are allocated to the City, they would become a part of the conjunctive use optimization project.

2.4 WATER DEMAND ANALYSIS
This section includes a discussion of the projected water demands for the proposed project in addition to the existing and projected future water demands of the City.

2.4.1 Project Water Demands
The proposed project would allow for the development of 405,531 SF of total building space, as shown in Table 1, on an approximate 46-acre site. The proposed project would also include 379,446 SF of landscaping.

The proposed project would connect to the City’s Domestic Water System. As shown in Figure 2, Aerial View, the project site is currently undeveloped.

The City of Bakersfield’s water flow rate for commercial and industrial development is used to estimate the proposed project’s water demand. As indicated in Chapter 3 of the City’s Standards and Specifications for Domestic Water Systems, flow requirements for commercial and industrial developments should be calculated by assuming 5 single-family residences per acre (Bakersfield 2022). For the 46-acre project site, this amounts to 230 single family units. The City’s Standards and Specifications for Domestic Water Systems indicate that the average daily demand is 185 gallons per capita per day and flow requirements should be calculated assuming

3.5 persons per dwelling unit (Bakersfield 2022). Therefore, as shown in Table 2 the proposed project’s total average water demand is 148,925 gallons per day or 166.8 afy.

Table 2 – Proposed Project Water Demand
Use Type
Size
(acres)
Single Family Residence Equivalent
(dwelling units/acre)
Average Daily Demand
(gallons per capita per day)
Unit Occupancy
(persons per dwelling unit)
Water Demand
(gallons per day)1
Commercial 46 5 185 3.5 148,925
Source: City of Bakersfield Standards and Specification for Domestic Water Systems, 2022. 1 Total water demand = 46 acres x 5 single family units per acre x 3.5 persons per dwelling unit x 185 gallons per capita per day = 148.925 gallons per day.

It should be noted that the proposed project’s Sewer Area Study calculates an average wastewater generation rate for the proposed project of 0.26 cubic feet per second (cfs). This equates to 168,042 gpd (Kimley Horn 2025). This is slightly larger than the average water demand shown in Table 2 since the sewer study’s intent is WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 12
to size sewer pipes. Sewer generation rates related to the design of sewer pipes are typically conservative to account for fluctuations in sewer generation to sidestep the risk of exceeding sewer pipe capacities. The City’s commercial average daily sewage discharge is more conservative than the average daily demand for commercial water use.

2.4.2 City of Bakersfield Water Demands
The source of water for the proposed project would be existing water supplies provided by the City to its customers. Based on the City’s 2020 UWMP, the current and projected water demands for normal years by customer class for the Domestic Water System are presented in Table 3. As shown in the table, the City’s Domestic Water System total water demand in 2020 was 45,649 AF for potable and raw water and 664 AF for recycled water. The projected 2040 water demand for potable water is 65,589 AF and the projected recycled water demand is 8,961 AF (City of Bakersfield 2021).

Table 3 – Current and Projected Potable Water Demands for the Domestic Water System (afy) Use Type 2020 2025 2030 2035 2040
Single Family 29,986 33,627 36,764 40,194 43,944
Multi-Family 1,534 1,506 1,646 1,800 1,968
Commercial 6,904 8,030 8,780 9,598 10,494
Industrial 314 502 549 600 656
Institutional/Governmental 3,527 4,015 4,390 4,799 5,247 Other 250 502 549 600 656
Water Loss 3,314 2,008 2,195 2400 2,624
Potable and Raw Water Subtotal 45,649 50,190 54,873 59,991 65,589 Recycled Water Subtotal 664 2,240 8,961 8,961 8,961
Total 46,313 52,340 63,834 68,952 74,550
Source: City of Bakersfield 2020 UWMP, 2021.

Table 4 shows the water demand projections for the City’s Wholesale Water System. The Wholesale Water System’s 2020 demand was 77,528 AF and the projected 2040 demand is 100,000 AF (Bakersfield 2021).

Table 4 – Current and Projected Potable Water Demands for the Wholesale Water System (afy) Demand Type 2020 2025 2030 2035 2040
Potable and Raw Water 77,528 100,000 100,000 100,000 100,000 Source: City of Bakersfield 2020 UWMP, 2021.

2.5 WATER SUPPLY AND DEMAND ANALYSIS
The City operates both a Domestic Water System and a Wholesale Water System. The water supply sources for the Domestic Water System are groundwater and recharged surface water supplies pumped from City owned wells and treated surface water from two water treatment plants The Domestic Water System is the focus of this analysis since this is the water available for municipal supply within the project area.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks
The amount of water that was supplied in 2020 to the City’s Domestic Water System service area is summarized in Table 5. As shown in the table, approximately 74 percent of the City’s water supply is groundwater, 25 percent is surface water, and one percent is recycled water.

Table 5 – Actual Water Supplies for the Domestic Water System (afy) Water Supply Source Additional Detail on Water Supply 2020 Actual Volume Water Quality Groundwater City Wells 34,107 Drinking Water
Surface Water (Kern River) Cal Water Northwest Treatment Plant 2,872 Drinking Water Surface Water (SWP supplemented by Kern River) Henry C. Garnett Water Purification Plant 8,760 Drinking Water Recycled Water WWTP No. 3 Tertiary 664 Recycled Water
Total 46,313 -
Source: Bakersfield, 2021. 2020 UWMP
Every urban water supplier is required to assess the reliability to provide water service to its customers under normal, dry, and multiple dry water years. As shown in Table 6, the City’s Domestic Water System will be able to meet demands with projected supplies under normal and drought conditions from 2025 to 2040. Table 6 shows that the water demand would increase from 52,430 afy in 2025 to 63,834 afy in 2030 under normal conditions and would increase from 42,662 afy to 46,642 afy for the fifth consecutive drought year. The water use projections have not been adjusted to account for future water savings from codes, standards, ordinances, or transportation and land use plans and are therefore very conservative.

The City can increase use of their groundwater wells during years of reduced Kern River supplies. The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would reduce in reductions in water demands by 10 to 15 percent during drought conditions (City of Bakersfield 2021).

Table 6 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy) 2025 2030 2035 2040
Normal Year
Supply Totals 52,430 63,834 68,952 74,550
Demand Totals 52,430 63,834 68,952 74,550
Difference 0 0 0 0
Single Dry Year
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Multiple Dry Year
Year 1
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Year 2

I I I I
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 14
Table 6 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy) 2025 2030 2035 2040
Supply Totals 45,171 49,386 53,992 59,030
Demand Totals 45,171 49,386 53,992 59,030
Difference 0 0 0 0
Year 3
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 4
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 5
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Source: Bakersfield, 2021. 2020 UWMP
The water demand for the proposed project is provided in Sections 2.4.1 and is estimated to be 166.8 afy. This demand amounts to less than one percent of the City’s total water demand for normal year conditions for the year 2030. Project buildout is anticipated to occur in 2027.

To evaluate water supply vs. demand within the City, the water demand for the proposed project should be evaluated with respect to current and future water demands provided in the UWMP. The UWMP projects an increase in water demand of 9,224 afy from 2020 to 2030. More specifically, the water demand for the commercial land use sector would increase 1,876 afy from 2020 to 2030. The estimated project water demand of 166.8 afy is only 8.9 percent of the increase in demand for the commercial land use sector and thus is accounted for in the UWMP as part of the future development in the City.

In addition, the City’s Water Shortage Contingency Plan would be implemented during drought conditions to further reduce water demand. Also, the water use projections in Table 6 do not account for future reductions in water demand with the implementation of water conservation programs, rebates for low-flow toilet and washer replacements, and the requirement to replace inefficient plumbing fixtures with the sale of residential and commercial properties. Also, this analysis did not consider the increased use of recycled water by the year 2030 that could be available to the proposed project or other future development within the City, which would further reduce the potable water demand.

Furthermore, the Kern River Conjunctive Use Optimization project would be implemented over time and involves the full use of the Citty’ available Kern River entitlement. Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

Therefore, the Domestic Water System can accommodate the proposed project’s demand of 166.8 afy.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks

2.6 WATER SHORTAGE CONTINGENCY PLAN
A Water Shortage Contingency Plan (WSCP) was adopted as a part of the City’s 2020 UWMP to provide measures, referred to as response actions, to be implemented in the event of water shortages.

In accordance with Water Code requirements, there are six standard water shortage levels and response actions defined in the City’s WSCP that increase restrictions on water use in response to increasing levels of water shortage conditions ranging from 10 percent to greater than 50 percent. The response actions and other considerations in the City’s WSCP are reviewed on a periodic basis to determine the effectiveness of the implementation of the various measures to achieve the desired water demand reductions (City of Bakersfield 2021).

2.7 DEMAND MANAGEMENT MEASURES
The City implements demand management measures (DMMs) designed to reduce water demands in the face of future droughts, improve water service reliability, and help meet state and regional water conservation goals.

The City DMMs include the following:
 Water waste prevention ordinances for the Domestic Water System  Metering
 Conservation pricing for the Domestic Water System
 Public education and outreach
 Programs to assess and manage distribution system losses  Water conservation program coordination and staffing support  Using recycled water for irrigation of the Kaiser Permanente Sports Village  Installing “smart” irrigation controllers in all City parks  Closing City spray parks during drought conditions
 Reducing the time and frequency of irrigation for City parks and landscape areas during drought conditions  Installing artificial turf at various City facilities and within street medians throughout the City  Prohibiting natural lawn within newly constructed City medians  Reducing the frequency that City vehicles are washed.  Replaced bathroom fixtures with water efficient fixtures at the Mechanics Bank Arena, Theater, and Convention Center, and the San Joaquin Community Ice Center of Bakersfield  Reducing the frequency and duration of fire apparatus testing operations  Updating landscape standards to reflect the current State Model Water Efficient Landscape Ordinance  Adopting, by reference, the California Green Code sections relating to installation of low water use plumbing fixtures in new construction
 Asset management for the Wholesale Water System
WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks • Page 16
 Wholesale supplier assistance program
The City also partners with Cal Water for the implementation of its Water Conservation Program. Cal Water maintains a Water Conservation Program Coordinator that oversees the water conservation programs available to the City’s Domestic Water System service area customers (City of Bakersfield 2021).

2.8 SUMMARY
The analysis in this report was prepared to assess the water demand and supply conditions with implementation of the proposed project. According to the City’s 2020 UWMP, the City has adequate supplies to serve all of its customers during normal, dry year, and multiple dry year conditions through 2040. The UWMP accounts for population increase and resultant increases in water demand in the analysis. As shown in Section 2.4.1, the proposed project would result in a water demand of 166.8 afy. This is only 8.9 percent of the projected increase in the commercial sector water demand from 2020 to 2030, assuming a buildout date of the project of 2027.

Future projects within the service area boundaries of the City’s Domestic Water System, which include the list of projects (the “Cumulative Projects List” as received from the City of Bakersfield Planning on March 5, 2025) that the City of Bakersfield has included in the proposed project’s Environmental Impact Report and accompany technical studies for purposes of cumulative impact analysis, would result in increases in water demand. The City’s Water Resources Department would review future projects for adequacy of water supply and updates the UWMP every five years to ensure that there are adequate water supplies and contingency plans for future residents and customers. The UWMP is based on anticipated growth projections for the City’s service area and therefore captures cumulative growth.

Additionally, under the provisions of Senate Bill (SB) 610, the City’s Water Resources Department is required to prepare a comprehensive water supply assessment for every new development “project” (as defined by Section 10912 of the Water Code) within its service area that meets certain thresholds. The types of projects that are subject to the requirements of SB 610 tend to be larger projects that may or may not have been included in the growth projections of the UWMP. The water supply assessment for such projects would evaluate the quality and reliability of existing and projected water supplies, as well as alternative sources of water supply and measures to secure alternative sources if needed. In addition, all future projects would require compliance with federal and State regulatory requirements, as well as the requirements of the Bakersfield Municipal Code, and the City’s standard conditions. These regulations would result in a reduction in per-capita water use over time.

Therefore, the City will have sufficient water supplies available through the year 2040 to meet all future water demands, including those of the proposed project. In the event of a water shortage, implementation of the City’s Water Shortage Contingency Plan and demand management measures would ensure that sufficient water supplies are available to serve its customers. The City also has additional water supplies available with implementation of the Kern River Conjunctive Use Optimization Project and an expansion of the recycled water system.

WATER SUPPLY AND DEMAND ANALYSIS – COFFEE AND RO SEDALE COMMERCIAL RETAIL DEVELOPMENT PROJECT

CITY OF BAKERSFIELD
March 2026 PlaceWorks

3. References
City of Bakersfield. December 2021. 2020 Urban Water Management Plan. https://www.calwater.com/docs/uwmp2020/BK_2020_UWMP_FINAL.pdf.

City of Bakersfield. September 30, 2022. Standards and Specification for Domestic Water Systems. https://content.civicplus.com/api/assets/9b56b19c-bf08-40a8-bce4-9c3158739407?cache=1800.

Kern County Subbsain Groundwater Sustainability Agencies. December, 2024. Kern County Subbasin Groundwater Sustainability Plan. https://kerngsp.com/wp-content/uploads/2024/12/Kern-Subbasin-2024-Groundwater-Sustainability-Plan.pdf.

Kimley Horn. November 5, 2025. Rosedale & Coffee Rd – Riverview Market, Southwest corner of Rosedale and Coffee Rd, Bakersfield, CA, Sewer Area Study.

Appendix I-2
Drainage Study

Kl^ley>»HOrn
kimley-horn.com 1100 W Town and Country Road, Suite 700, Orange CA 92868 714-939-1030 Rosedale & Coffee Rd – Riverview
Market
Southwest corner of Rosedale and Coffee Rd,
Bakersfield, CA
Drainage Study
Prepared for:

DJM
777 Edinger Ave, #113
Huntington Beach, CA 92647
May 13, 2026
Prepared by:

Kimley-Horn
1100 W Town and Country Road, Suite 700
Orange, CA 92868
Barsin Bet Govargez, PE C81751
KimleyHorn