Cities Index.
Minutes, regular meeting, second session

Bakersfield City Council
November 4, 2026

Document
Minutes, regular meeting, second session
Meeting
November 4, 2026
Body
Bakersfield City Council
Pages
223
Original file
413.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

California are 90 percent lower than in the early 1960s despite the tripling of diesel fuel use (CARB 2017a). In-use on-road rules are to reduce black carbon emissions from on-road sources by 80 percent between 2000 and 2020.

2.3 ENERGY
Federal, state, and local laws, regulations, plans, or guidelines related to energy that are applicable to the proposed project are summarized in this section.

2.3.1 Regulatory Setting

2.3.1.1 FEDERAL REGULATIONS
Federal Energy Policy and Conservation Act
The Energy Policy and Conservation Act of 1975 was established in response to the 1973 oil crisis. The act created the Strategic Petroleum Reserve, established vehicle fuel economy standards, and prohibited the export of U.S. crude oil (with a few limited exceptions). It also created Corporate Average Fuel Economy (CAFE) standards for passenger cars starting in model year 1978. The CAFE Standards are updated periodically to account for changes in vehicle technologies, driver behavior, and/or driving conditions.

The federal government issued new CAFE standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon (mpg) in 2025. On March 30, 2020, the EPA finalized updated CAFE and greenhouse gas (GHG) emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026. On December 21, 2021, under direction of Executive Order 13990 issued by President Biden, the National Highway Traffic Safety Administration (NHTSA) repealed SAFE Vehicles Rule Part One, which had preempted State and local laws related to fuel economy standards. In addition, on March 31, 2022, the NHTSA finalized new fuel standards that will increase fuel efficiency eight percent annually for model years 2024 to 2025 and 10 percent annually for model year 2026. Overall, the new CAFE standards require a fleet average of 49 mpg for passenger vehicles and light trucks for model year 2026, which will be a 10 mpg increase compared to model year 2021 (NHTSA 2022).

On June 7, 2024, National Highway Traffic Safety Administration (NHTSA) announced final CAFE standards for passenger cars and light trucks built in model years 2027 to 2031 and final fuel efficiency standards for heavy-duty pickup trucks and vans built in model years 2030 to 2035. The final rules establish standards that would require an industry fleetwide average of approximately 50.4 mpg for passenger cars and light trucks in model year 2031, by increasing fuel economy by 2 percent year over year for passenger cars (model years 2027– 2031) and for light trucks (model years 2029–2031). For heavy-duty pickup trucks and vans, the final rule would increase fuel efficiency at a rate of 10 percent per year (model years 2030–2032) and 8 percent per year (model years 2033–2035) (NHTSA 2024).

In June 2025, NHTSA published a final rule, “Resetting the Corporate Average Fuel Economy Program.” The rule identifies factors statutorily prohibited from consideration when setting maximum feasible fuel economy

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

2. Regulatory Setting
May 2026 Page 41
standards under the Energy Policy and Conservation Act of 1975, the Energy Independence and Security Act of 2007, and other applicable law. It also describes NHTSA’s authority to bring the CAFE program into compliance with relevant statutory requirements, in accordance with the President Trump’s “Unleashing American Energy” Execute Order and the Secretary’s “Fixing the CAFE Program” Memorandum. The rule also describes NHTSA’s interpretation of its authority for a commercial medium- and heavy-duty on-highway vehicle and work truck fuel efficiency improvement program, to establish the necessary legal foundation to bring that program into compliance with law. This rule does not itself change existing CAFE or medium- and heavy-duty standards. During the rulemaking process for replacement standards, NHTSA will exercise its enforcement authority regarding all existing CAFE and medium- and heavy-duty standards in accordance with the interpretation set forth in this rulemaking (NHTSA 2025).

Energy Independence and Security Act of 2007
The Energy Independence and Security Act of 2007 (Public Law 110-140) seeks to provide the nation with greater energy independence and security by increasing the production of clean renewable fuels; improving vehicle fuel economy; and increasing the efficiency of products, buildings, and vehicles. It also seeks to improve the energy performance of the federal government. The Act set increased CAFE standards, the Renewable Fuel Standard, appliance energy efficiency standards, and building energy efficiency standards and accelerated research and development tasks on renewable energy sources (e.g., solar energy, geothermal energy), carbon capture, and sequestration (USEPA 2025c).

2.3.1.2 STATE LAWS
Warren-Alquist Act
Established in 1974, the Warren-Alquist Act created the California Energy Commission (CEC) in response to the energy crisis of the early 1970s and the state’s unsustainable growing demand for energy resources. The CEC’s core responsibilities include advancing State energy policy, encouraging energy efficiency, certifying thermal power plants, investing in energy innovation, developing renewable energy, transforming transportation, and preparing for energy emergencies. The Warren-Alquist Act is updated periodically through legislative bills to address current energy needs and issues.

Renewables Portfolio Standard
Senate Bills 1078, 107, and X1-2 and Executive Order S-14-08 The California Renewables Portfolio Standard Program was established in 2002 under SB 1078 (Sher) and 107 (Simitian). The RPS program requires investor-owned utilities, electric service providers, and community choice aggregators to increase the use of eligible renewable energy resources to 33 percent of total procurement by 2020. Initially, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least 1 percent in order to reach at least 20 percent by December 30, 2010. Executive Order S-14-08 was signed in November 2008 and expanded the state’s Renewable Energy Standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2). The California Public Utilities Commission is required to provide quarterly progress reports on progress toward RPS goals. This has accelerated the development of renewable energy projects throughout the state. For year 2020, the three largest

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

2. Regulatory Setting

Page 42 ends

retail energy utilities provided an average of 43 percent of its supplies from renewable energy sources.

Community choice aggregators provided an average of 41 percent of its supplies from renewable sources (CPUC 2021).

Senate Bill 350
Senate Bill 350 (de Leon) was signed into law September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.

Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which replaced the SB 350 requirements. Under SB 100, the RPS for public-owned facilities and retail sellers consist of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030. SB 100 also established a new RPS requirement of 50 percent by 2026. The bill establishes an overall state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.

Senate Bill 1020
SB 1020 was signed into law on September 16, 2022. It requires renewable energy and zero-carbon resources to supply 90 percent of all retail electricity sales by 2035 and 95 percent by 2040. Additionally, SB 1020 requires all state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.

Energy Efficiency Regulations
California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and nonresidential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 (24 California Code of Regulations [CCR] Part 6). Part 6 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy-efficiency technologies and methods.

The 2022 Building Energy Efficiency Standards were adopted on August 11, 2021, and went into effect on January 1, 2023. The 2022 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic (PV) and battery storage standards, strengthen ventilation standards, and more. The 2022 standards require mixed-fuel single-family homes to be electric-ready to accommodate replacement of gas appliances with electric appliances. In addition, the standards also include prescriptive PV system and battery requirements for high-rise, multifamily buildings (i.e., more than three stories) and noncommercial buildings such as hotels, offices, medical offices, restaurants, retail stores, schools, warehouses, theaters, and convention centers (CEC 2021). The 2025 Building Energy Efficiency Standards

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

2. Regulatory Setting
May 2026 Page 43
were adopted September 24, 2024, and became effective and replaced the 2022 Building Energy Efficiency Standards on January 1, 2026. Updates under the 2025 Building Energy Efficiency Standards include electric-ready requirements for some multi-family buildings and commercial kitchens and solar and battery energy storage requirements for assembly buildings including religious worship, sports, and recreational buildings.

Under the prescriptive pathway, a new development’s building design is considered the “Standard Design Building,” which represents the energy-efficiency performance of that project should it include all prescribed features (e.g., solar, battery storage) with no additional energy-efficiency features beyond what is required at minimum under the mandatory requirements and prescriptive pathway. A project may still demonstrate compliance using the performance pathway without inclusion of prescriptive features like solar or battery storage. However, that building design must match or exceed the energy efficiency performance of the Standard Design Building. For example, if a project would be required to include solar and battery storage under the prescriptive pathway, it can choose to comply with the performance pathway and not include solar and battery storage so long as it can demonstrate that it would achieve the same energy-efficiency performance as if solar and battery storage were included.

California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11, known as “CALGreen”) was adopted as part of the California Building Standards Code. It includes mandatory requirements for new residential and nonresidential buildings throughout California. CALGreen is intended to (1) reduce GHG emissions from buildings; (2) promote environmentally responsible, cost-effective, healthier places to live and work; (3) reduce energy and water consumption; and (4) respond to the directives by the Governor. The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2022. The 2022 CALGreen update, which was approved as part of 2022 Energy Code became effective on January 1, 2023, and provides updates to the residential and non-residential voluntary measures.

Overall, the code is established to reduce construction waste, make buildings more efficient in the use of materials and energy, and reduce environmental impact during and after construction. CALGreen contains requirements for construction site selection, stormwater control during construction, construction waste reduction, indoor water use reduction, material selection, natural resource conservation, site irrigation conservation, and more. The code provides for design options allowing the designer to determine how best to achieve compliance for a given site or building condition. The code also requires building commissioning, which is a process for verifying that all building systems (e.g., heating and cooling equipment and lighting systems) are functioning at their maximum efficiency (24 CCR Part 11).

The CEC adopted the final code language for the 2025 CALGreen standards on September 11, 2024. The 2025 CALGreen standards became effective on January 1, 2026. 2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

2. Regulatory Setting

Page 44 ends

regulations include standards for both federally regulated appliances and non–federally regulated appliances.

Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.

May 2026 Page 45

3. Environmental Setting

3.1 SAN JOAQUIN VALLEY AIR BASIN
The proposed project is in the central portion of the SJVAB. SJVAB consists of eight counties: Fresno, Kern (western and central), Kings, Tulare, Madera, Merced, San Joaquin, and Stanislaus. Air pollution from significant activities in the SJVAB includes a variety of industrial-based sources as well as on- and off-road mobile sources.

These sources, coupled with geographical and meteorological conditions unique to the area, stimulate the formation of unhealthy air.

The SJVAB is approximately 250 miles long and an average of 35 miles wide. It is bordered by the Sierra Nevada in the east, the Coast Ranges in the west, and the Tehachapi mountains in the south. There is a slight downward elevation gradient from Bakersfield in the southeast end (elevation 408 feet) to sea level at the northwest end where the valley opens to the San Francisco Bay at the Carquinez Straits. At its northern end is the Sacramento Valley, which makes up the northern half of California’s Central Valley. The bowl-shaped topography inhibits movement of pollutants out of the valley (SJVAPCD 2023b).

3.1.1 Climate
The SJVAB is in a Mediterranean climate zone, which is characterized by sparse rainfall, which occurs mainly in winter. Summers are hot and dry. Summertime maximum temperatures often exceed 100 degrees Fahrenheit (°F) in the valley. Winter-time high pressure events can often last many weeks, with surface temperatures often lowering to 30°F. During these events, fog can be present, and inversions are extremely strong. These wintertime inversions can inhibit vertical mixing of pollutants to a few hundred feet (SJVAPCD 2015b).

In addition, the SJVAB is influenced by a subtropical high-pressure cell for most of the year. The high-pressure cell is strongest during spring, summer, and fall and produces subsiding air, which can result in temperature inversions in the valley. A temperature inversion can act like a lid, inhibiting vertical mixing of the air mass at the surface. Any emissions of pollutants can be trapped below the inversion. Most of the surrounding mountains are above the normal height of summer inversions (1,500 to 3,000 feet) (SJVAPCD 2015b).

The climatological station nearest to the project area is the Bakersfield Airport Monitoring Station (ID No. 040442). The average low is reported at 38.5°F in January, and the average high is 98.6°F in July (WRCC 2026).

Rainfall averages 6.17 inches per year in the project area (WRCC 2026).

3.1.1.1 TEMPERATURE
Solar radiation and temperature are particularly important in the chemistry of ozone formation. The SJVAB averages over 260 sunny days per year. Photochemical air pollution (primarily ozone) is produced by the atmospheric reaction of organic substances (such as volatile organic compounds) and nitrogen dioxide under the influence of sunlight. Ozone concentrations are very dependent on the amount of solar radiation, especially

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting

Page 46 ends

during late spring, summer, and early fall. Ozone levels typically peak in the afternoon. After the sun goes down, the chemical reaction between nitrous oxide and ozone begins to dominate. This reaction tends to scavenge and remove the ozone in the metropolitan areas through the early morning hours, resulting in the lowest ozone levels, possibly reaching zero at sunrise in areas with high nitrogen oxides emissions. At sunrise, nitrogen oxides tend to peak, partly due to low levels of ozone at this time and also due to the morning commuter vehicle emissions of nitrogen oxides.

Generally, the higher the temperature, the more ozone formed, since reaction rates increase with temperature.

However, extremely hot temperatures can “lift” or “break” the inversion layer. Typically, if the inversion layer does not lift to allow the buildup of contaminants to be dispersed, the ozone levels will peak in the late afternoon. If the inversion layer breaks and the resultant afternoon winds occur, the ozone will peak in the early afternoon and decrease in the late afternoon as the contaminants are dispersed or transported out of the SJVAB. Ozone levels are low during winter periods when there is much less sunlight to drive the photochemical reaction (SJVAPCD 2015b).

3.1.1.2 WIND
Wind speed and direction play an important role in dispersion and transport of air pollutants. Wind at the surface and aloft can disperse pollution by mixing and transporting it to other locations. Winds in the valley most frequently blow from the northwest, especially during summer. The region’s topographic features restrict air movement and channel the air mass towards the southeastern end of the valley. Marine air can flow into the basin from the San Joaquin River Delta and over Altamont Pass and Pacheco Pass, where it can flow along the axis of the valley, over the Tehachapi pass, into the Southeast Desert Air Basin. This wind pattern contributes to transporting pollutants from the Sacramento Valley and the Bay Area into the SJVAB. Approximately 27 percent of the total emissions in the northern portion, 11 percent of total emissions in the central region, and 7 percent of total emission in the south valley of the SJVAB are attributed to air pollution transported from these two areas (SJVAPCD 2015b). The Coastal Range is a barrier to air movement to the west, and the high Sierra Nevada range is a significant barrier to the east (the highest peaks in the southern Sierra Nevada reach almost halfway through the Earth’s atmosphere). Many days in the winter are marked by stagnation events where winds are very weak. Transport of pollutants during winter can be very limited. A secondary but significant summer wind pattern is from the southeast and can be associated with nighttime drainage winds, prefrontal conditions, and summer monsoons.

Two significant diurnal wind cycles that occur frequently in the valley are the sea breeze and mountain-valley upslope and drainage flows. The sea breeze can accentuate the northwest wind flow, especially on summer afternoons. Nighttime drainage flows can accentuate the southeast movement of air down the valley. In the mountains during periods of weak synoptic-scale winds, winds tend to be upslope during the day and downslope at night. Nighttime and drainage flows are especially pronounced during the winter when flow from the east is enhanced by nighttime cooling in the Sierra Nevada. Eddies can form in the valley wind flow and can recirculate a polluted air mass for an extended period (SJVAPCD 2015b).

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting
May 2026 Page 47

3.1.1.3 PRECIPITATION, HUMIDITY, AND FOG
Precipitation and fog may reduce or limit some pollutant concentrations. Ozone needs sunlight for its formation, and clouds and fog can block the required solar radiation. Wet fogs can cleanse the air during winter as moisture collects on particles and deposits them on the ground. Atmospheric moisture can also increase pollution levels. In fogs with less water content, the moisture acts to form secondary ammonium nitrate particulate matter. This ammonium nitrate is part of the valley’s PM2.5 and PM10 problem. The winds and unstable air conditions during the passage of winter storms result in periods of low pollutant concentrations and excellent visibility. Between winter storms, high pressure and light winds allow cold moist air to pool on the SJVAB floor. This creates strong low-level temperature inversions and very stable air conditions, which can lead to tule fog. Wintertime conditions favorable to fog formation are also favorable to high concentrations of PM2.5 and PM10 (SJVAPCD 2015b).

3.1.1.4 INVERSIONS
The vertical dispersion of air pollutants in the San Joaquin Valley can be limited by persistent temperature inversions. Air temperature in the lowest layer of the atmosphere typically decreases with altitude. A reversal of this atmospheric state, where the air temperature increases with height, is termed an inversion. The height of the base of the inversion is known as the “mixing height.” This is the level to which pollutants can mix vertically. Mixing of air is minimized above and below the inversion base. The inversion base represents an abrupt density change where little air movement occurs.

Inversion layers are significant in determining pollutant concentrations. Concentration levels can be related to the amount of mixing space below the inversion. Temperature inversions that occur on the summer days are usually 2,000 to 2,500 feet above the valley floor. In winter months, overnight inversions occur 500 to 1,500 feet above the valley floor (SJVAPCD 2015b).

3.2 SJVAB AREA DESIGNATIONS
The air quality management plans prepared by SJVAPCD provide the framework for SJVAB to achieve attainment of the State and federal AAQS through the SIP. Areas are classified as attainment or nonattainment areas for particular pollutants depending on whether they meet the ambient air quality standards. Severity classifications for ozone nonattainment range in magnitude from marginal, moderate, and serious to severe and extreme.
 Unclassified. A pollutant is designated unclassified if the data are incomplete and do not support a designation of attainment or nonattainment.
 Attainment. A pollutant is in attainment if the AAQS for that pollutant was not violated at any site in the area during a three-year period.
 Nonattainment. A pollutant is in nonattainment if there was at least one violation of an AAQS for that pollutant in the area.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting

Page 48 ends

 Nonattainment/Transitional. A subcategory of the nonattainment designation. An area is designated nonattainment/transitional to signify that the area is close to attaining the AAQS for that pollutant.

The attainment status for the SJVAB is shown in Table 7, Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin. Table 7 Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin Table 7 Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin Pollutant State Federal
Ozone – 1-hour Severe Nonattainment No Federal Standard1 Ozone – 8-hour Nonattainment Extreme Nonattainment2
PM10 Nonattainment Attainment3
PM2.5 Nonattainment Nonattainment4
CO Attainment/Unclassified Attainment/Unclassified
NO2 Attainment Attainment/Unclassified
SO2 Attainment Attainment/Unclassified
Lead Attainment No Designation/Classification
Hydrogen Sulfide Unclassified No Federal Standard
Sulfates Attainment No Federal Standard
Visibility Reducing Particles Unclassified No Federal Standard Vinyl Chloride Attainment No Federal Standard
Source: CARB 2026a; SJVAPCD 2026c.
1 Though the Valley was initially classified as serious nonattainment for the 1997 8-hour ozone standard, the EPA approved Valley reclassification to extreme nonattainment in the Federal Register on May 5, 2010 (effective June 4, 2010). 2 Effective June 15, 2005, the EPA revoked the federal 1-hour ozone standard, including associated designations and classifications. The US EPA had previously classified the SJVAB as extreme nonattainment for this standard. The US EPA approved the 2004 Extreme Ozone Attainment Demonstration Plan on March 8, 2010 (effective April 7, 2010). Many applicable requirements for extreme 1-hour ozone nonattainment areas continue to apply to the SJVAB.
3 On September 25, 2008, the EPA redesignated the San Joaquin Valley to attainment for the PM10 National AAQS and approved the PM10 Maintenance Plan.
4 The Valley is designated nonattainment for the 1997 PM2.5 National AAQS. The EPA designated the Valley as nonattainment for the 2006 PM2.5 National AAQS on November 13, 2009 (effective December 14, 2009).

3.3 EXISTING AMBIENT AIR QUALITY
Existing levels of ambient air quality and historical trends and projections in the vicinity of the proposed project site are best documented by measurements taken by the SJVAPCD. The air quality monitoring station closest to the proposed project is the Bakersfield-5558 California Avenue Monitoring Station, which is one of 29 monitoring stations SJVAPCD operates and maintains in the SJVAB. Data from this station include O3, PM10, and PM2.5 and are summarized in Table 8, Ambient Air Quality Monitoring Summary. The most current five years of data from these monitoring stations are included in Table 8 and show regular violations of the state and federal O3, state and federal PM10 standards, and federal PM2.5 standards in the last five years.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting
May 2026 Page 49
Table 8 Ambient Air Quality Monitoring Summary
Pollutant/Standard
Number of Days Thresholds Were Exceeded and
Maximum Levels1
2020 2021 2022 2023 2024
Ozone (O3)
State 1-Hour ≥ 0.09 ppm (days exceed threshold)
State & Federal 8-hour ≥ 0.070 ppm (State/Federal days exceed threshold) Max. 1-Hour Conc. (ppm)
Max. 8-Hour Conc. (ppm)
3 25/25

0.110

0.098
0 11/11

0.090

0.080
0 7/4

0.093

0.076
0 7/7

0.088

0.079
2 38/36

0.099

0.089
Nitrogen Dioxide (NO2)
State 1-Hour ≥ 0.18 ppm (days exceed threshold)
Max. 1-Hour Conc. (ppm)
0 0.0504
0 0.0572
0 0.0536
0 0.0577
0 0.0566
Coarse Particulates (PM10)
State 24-Hour > 50 µg/m3 (days exceed threshold)
Federal 24-Hour > 150 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
18 1
196.8
124
3 437.5
135
0 134.7
106
1 181.3
110
0 129.7
Fine Particulates (PM2.5)
Federal 24-Hour > 35 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
44 150.7
40 72.3
34 58.1
9 63.7
15 71.9
Source: CARB 2026c.

Notes: ppm = parts per million; ppb = parts per billion; µg/m3 = micrograms per cubic meter; * = Data not available 1 Data obtained from the Bakersfield-5558 California Avenue Monitoring Station.

3.4 EXISTING SITE EMISSIONS
The project site is currently undeveloped and highly disturbed and does not generate criteria air pollutant or GHG emissions.

3.5 ELECTRIC AND NATURAL GAS UTILITIES
The project site is in the Pacific Gas and Electric Company (PG&E) service area for both electricity and natural gas. PG&E is a publicly traded utility company that generates, purchases, and transmits energy under contract with the California Public Utilities Commission. Its service territory is 70,000 square miles, extending north to south from Eureka to Bakersfield, and east to west from the Sierra Nevada range to the Pacific Ocean.

3.5.1 Electricity
The electricity distribution system of PG&E consists of 106,681 circuit miles of electric distribution lines and 18,466 circuit miles of interconnected transmission lines (PG&E 2022). PG&E electricity is generated by a combination of sources such as coal-fired power plants, nuclear power plants, and hydro-electric dams as well as newer sources of energy, such as wind turbines and photovoltaic plants or “solar farms.” “The grid,” or bulk electric grid, is a network of high-voltage transmission lines linked to power plants in the PG&E system. The distribution system consists of lower voltage secondary lines at the street and neighborhood level, with overhead or underground distribution lines, transformers, and individual service “drops” that connect to the individual customer.

I I I I

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting

Page 50 ends

Total electricity consumption in PG&E’s service area was 75,338 gigawatt-hours in 2024 (CEC 2026a). One gigawatt-hour is equivalent to one million kilowatt-hours (kWh). Sources of electricity sold by PG&E for its base plan in 2024, the latest year for which data are available, were (PG&E 2026b):
 23 percent renewable, consisting mostly of solar and wind  12 percent large hydroelectric
 2 percent natural gas
 63 percent nuclear

3.5.2 Natural Gas
PG&E gas transmission pipeline systems serve approximately 4.5 million gas customers in northern and central California (PG&E 2022). The system is operated under an inspection and monitoring program. The system operates in real time on a 24-hour basis and includes leak inspections, surveys, and patrols of the pipelines.

PG&E also adopted Pipeline 2020 program, which aims to modernize critical pipeline infrastructure, expand the use of automatic or remotely operated shut-off valves, catalyze development of next-generation inspection technologies, develop industry-leading best practices, and enhance public safety partnerships with local communities, public officials, and first responders. Total natural gas consumption in PG&E’s service area was 4,255 million therms for 2024 (CEC 2026b).

3.5.3 Transportation Fuels
California contains a network of crude oil pipelines that connects production areas to oil refineries in the Los Angeles area, the San Francisco Bay Area, and the Central Valley. California oil refineries also process Alaskan and foreign crude oil received in ports in Los Angeles, Long Beach, and the San Francisco Bay Area. Crude oil production in California and Alaska is in decline, and California refineries have become increasingly dependent on foreign imports (CEC 2026c). Foreign supplies, led by Iraq, Brazil, and Guyana in 2024, provide over half of the crude oil refined in California (CEC 2026d). According to the United States Energy Information Administration, California’s field production of crude oil has steadily declined since the mid-1980s, with a total production of approximately 110 million barrels in 2024 (EIA 2026). In Kern County, including all incorporated cities, approximately 406 million gallons of gasoline and 225 million gallons of diesel fuel were sold in 2024, the latest year of available data (CEC 2026e).

3.6 EXISTING SITE ENERGY DEMAND
The project site is currently undeveloped and highly disturbed and does not generate energy demands.

3.7 SENSITIVE RECEPTORS
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, the elderly, the acutely ill, and the chronically ill, especially those with cardiorespiratory diseases.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting
May 2026 Page 51
Residential areas are also considered sensitive receptors to air pollution because residents (including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Other sensitive receptors include retirement facilities, hospitals, and schools. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution. In addition, noticeable air pollution can detract from the enjoyment of recreation. Industrial, commercial, retail, and office areas are considered the least sensitive to air pollution. Exposure periods are relatively short and intermittent because the majority of the workers tend to stay indoors most of the time. In addition, the working population is generally the healthiest segment of the public.

Nearby off-site sensitive receptors include the mobile-home park residences 750 feet to the west, single-family residences 800 feet to the southwest, and single-family residences 1,300 feet to the north of the project site.

Additionally, there are two buildings approximately 200 to 450 feet west of the project site across El Toro Viejo Road. However, it is uncertain whether these two buildings currently house residents or are used for nonresidential purposes only. For purposes of this analysis, they are assumed as residential homes. Additionally, for purposes of this analysis, workers are also included as sensitive receptors. The nearest worker receptors are the offsite workers at the surrounding businesses.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

3. Environmental Setting

Page 52 ends

This page intentionally left blank.

May 2026 Page 53

4. CEQA Thresholds

4.1 CEQA APPENDIX G THRESHOLDS

4.1.1 Air Quality
According to Appendix G of the CEQA Guidelines, the proposed project would have a significant effect on the environment with respect to air quality if it would:

AQ-1 Conflict with or obstruct implementation of the applicable air quality plan.

AQ-2 Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard.

AQ-3 Expose sensitive receptors to substantial pollutant concentrations.

AQ-4 Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

4.1.2 Greenhouse Gas Emissions
According to Appendix G of the CEQA Guidelines, the proposed project would have a significant effect on the environment with respect to GHG emissions if it would:

GHG-1 Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment.

GHG-2 Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs.

4.1.3 Energy
According to Appendix G of the CEQA Guidelines, the proposed project would have a significant effect on the environment with respect to energy if it would:

E-1 Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation.

E-2 Conflict with or obstruct a state or local plan for renewable energy or energy efficiency.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds

Page 54 ends

4.2 SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SIGNIFICANCE CRITERIA

4.2.1 Air Quality
As stated in Appendix G of the CEQA Guidelines, the significance criteria established by the applicable air quality management district may be relied on to make the above determinations. Thus, this analysis also evaluates the Specific Plan’s air quality impacts pursuant to SJVAPCD’s recommended guidelines and thresholds of significance, as discussed further below.

SJVAPCD developed the Guide for Assessing and Mitigating Air Quality Impacts (GAMAQI) and adopted the latest version on March 19, 2015 (SJVAPCD 2015b). The current GAMAQI is the latest guidance for addressing air quality impacts in the SJVAB. Changes to the GAMAQI are primarily administrative in nature to update air basin information, attainment status, and general guidance to reflect updated conditions. The following thresholds of significance from the SJVAPCD’s GAMAQI are used to determine whether a proposed project would result in a significant air quality impact.

4.2.1.1 REGIONAL SIGNIFICANCE THRESHOLDS
SJVAPCD has identified regional construction and operational emissions thresholds to determine a project’s cumulative impact on air quality in the SJVAB. Specifically, these thresholds gauge whether a project would significantly contribute to a nonattainment designation based on the mass emissions generated. Mass emissions from a project are not correlated with concentrations of air pollutants. Table 9, SJVAPCD Regional Criteria Air Pollutants Significance Thresholds, lists SJVAPCD’s regional significance thresholds. It should be noted that SJVAPCD Rule 9510 and Regulation VIII may not reduce project-specific construction and operational emissions to below the SJVAPCD thresholds.

Table 9 SJVAPCD Regional Criteria Air Pollutants Significance Thresholds Air Pollutant Construction and Operation Phase
Reactive Organic Gases (ROG) 10 tons/year
Carbon Monoxide (CO) 100 tons/year
Nitrogen Oxides (NOX) 10 tons/year
Sulfur Oxides (SOX) 27 tons/year
Coarse Particulates (PM10) 15 tons/year
Fine Particulates (PM2.5) 15 tons/year
Source: SJVAPCD 2015b.

4.2.1.2 AMBIENT AIR QUALITY ANALYSIS
The need to perform air quality dispersion modeling for typical urban development projects is determined on a case-by-case basis, depending on project size. SJVAPCD applies the following guidance in determining whether an ambient air quality analysis should be conducted for development projects. Compliance with Rule 9510 frequently reduces project-specific emissions to less than significant levels. However, for large construction projects, additional mitigation may be required. SJVAPCD recommends that an ambient air quality

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds
May 2026 Page 55
analysis be performed for all pollutants when on-site emissions of any criteria pollutant from construction activities would equal or exceed any applicable threshold of significance for criteria pollutants, or 100 pounds per day of any criteria pollutant, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. Similarly, SJVAPCD also recommends that an ambient air quality analysis be performed for all criteria pollutants when emissions of any criteria pollutant resulting from project operational activities exceed the 100 pounds per day screening level, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. For projects that exceed the 100 pounds per day screening level, project-related concentrations are compared to the following NAAQS and CAAQS shown in Table 10, Ambient Air Quality Thresholds. Additionally, if either the NAAQS and/or CAAQS are exceeded, the SJVAPCD developed the significant impact levels (SILs) shown in Table 11, SJVAPCD Significant Impact Levels, to determine whether a project’s contribution would contribute significantly to an AAQS exceedance.

Table 10 Ambient Air Quality Thresholds
Pollutant
Averaging
Period
NAAQS
µg/m3
CAAQS
µg/m3
NO2 1-hour 188.7 339
Annual 100 57
CO 1-hour 40,000 23,000
8-hour 10,000 10,000
SO2
1-hour 196 655
3-hour 1,300 n/a
24-hour 365 105
Annual n/a n/a
PM10 24-hour 150 50
Annual n/a 20
PM2.5 24-hour 35 n/a
Annual 12 12
Notes: NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds

Page 56 ends

Table 11 SJVAPCD Significant Impact Levels
Pollutant
Averaging
Period
Class II Significant Impact Levels
µg/m3
NO2 1-hour 7.5
Annual 1
CO 1-hour 2.000
8-hour 500
SO2
1-hour 7.8
3-hour 25
24-hour 5
Annual 1
PM101 24-hour 10.4
Annual 2.08
PM2.51 24-hour 2.5
Annual 0.63
Source: SJVAPCD 2024.

Notes: μg/m3 = micrograms per cubic meter
1 Because the proposed project is a land use development project and emissions would primarily be from non-point sources, the fugitive PM10 and PM2.5 SILs are utilized.

4.2.1.3 CONSISTENCY WITH THE APPLICABLE AIR QUALITY PLAN SJVAPCD has prepared plans to attain federal and State AAQS. The significance thresholds in Table 9 are based on SJVAPCD’s New Source Review offset requirements for stationary sources. Emission reductions achieved through implementation of SJVAPCD’s offset requirements are a major component of SJVAPCD’s air quality plans. Thus, projects with emissions below the thresholds of significance for criteria pollutants (see Table 9) would be determined to “not conflict or obstruct implementation of the [SJVAPCD’s] air quality plan” (SJVAPCD 2015b).

4.2.1.4 ODOR
Odor impacts associated with a proposed project would be considered significant if the project has the potential to frequently expose members of the public to objectionable odors. There are two general scenarios where a project could expose people to substantial odors:
 Odor Generator. Projects that would potentially generate odorous emissions proposed to locate near existing sensitive receptors or other land uses where people may congregate.  Odor Receiver. Residential or other sensitive receptor projects or other projects built for the intent of attracting people locating near existing odor sources.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds
May 2026 Page 57
Due to the subjective nature of odor impacts, the number of variables that can influence the potential for an odor impact, and the variety of odor sources, there are no quantitative or formulaic methodologies to determine if potential odors would have a significant impact. Rather, projects must be assessed on a case-by-case basis.

As shown in Table 12, SJVAPCD Screening Levels for Potential Odor Sources, the SJVAPCD has identified buffer distances for common types of facilities that have been known to produce odors in the SJVAB. The degree of odors could be significant and may be based on a review of SJVAPCD’s complaint records.

Table 12 SJVAPCD Screening Levels for Potential Odor Sources Land Use/Type of Operation Screening Distance
Wastewater Treatment Plant 2 miles
Sanitary Landfill 1 mile
Transfer Station 1 mile
Composting Facility 1 mile
Petroleum Refinery 2 miles
Asphalt Batch Plant 1 mile
Chemical Manufacturing 1 mile
Fiberglass Manufacturing 1 mile
Painting/Coating Operations 1 mile
Food Processing Facility 1 mile
Feed Lot/ Dairy 1 mile
Rendering Plant 1 mile
Source: SJVAPCD 2015b.

For a project locating near an existing source of odors, in California Building Industry Association v. Bay Area Air Quality Management District (CBIA), the California Supreme Court ruled that CEQA generally does not require an evaluation of impacts of the environment on a project unless a project will exacerbate an existing environmental hazard.

4.2.1.5 HEALTH RISK THRESHOLDS
Whenever a project would require use of chemical compounds that have been identified in SJVAPCD’s Rule 2201; placed on CARB’s air toxics list pursuant to AB 1807, Toxic Air Contaminant Identification and Control Act (1983); or placed on the EPA’s National Emissions Standards for Hazardous Air Pollutants, a health risk assessment is warranted. If a project would place sensitive land uses proximate to major sources of TACs (roadways with over 50,000 vehicles per day or major stationary sources), a health risk assessment may also be warranted. Table 13, SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds, lists the SJVAPCD’s TAC incremental risk thresholds for operation of a project or placement of sensitive land uses proximate to major sources of air pollution. As stated under the CBIA ruling, though CEQA is generally not required to analyze impacts of the environment on a project, where a project will exacerbate an existing environmental hazard, CEQA requires an analysis of the worsened condition on future project residents and the public at large.

However, projects that do not generate emissions that exceed the values in Table 13 would not substantially contribute to cumulative air quality hazards or exacerbate an existing environmental hazard.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds

Page 58 ends

Table 13 SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds Risk Type Threshold
Cancer Risk1 ≥ 20 in 1 million
Hazard Index2 ≥ 1.0
Source: SJVAPCD 2015b.
1 For the Maximum Exposed Individuals (MEI).
2 Ground-level concentrations of noncarcinogenic TACs for the MEI.

4.2.1.6 CUMULATIVE IMPACTS
By its very nature, air pollution is mostly a cumulative impact. The nonattainment status of regional pollutants is a result of past and present development. Future attainment of federal and State AAQS is a function of successful implementation of the SJVAPCD’s attainment plans. Consequently, SJVAPCD’s application of thresholds of significance for criteria pollutants is relevant to the determination of whether a project’s individual emissions would have a cumulatively significant impact on air quality. Pursuant to the SJVAPCD’s guidance, if project-specific emissions would be less than the thresholds of significance for criteria pollutants, the project would not be expected to result in a cumulatively considerable net increase of any criteria pollutant for which the SJVAPCD is in nonattainment under applicable federal or State AAQS.

4.2.2 Greenhouse Gas Emissions
The issue of global climate change is, by definition, a cumulative environmental impact. The SJVAPCD adopted Guidance Methodology for addressing GHG emissions under CEQA on December 17, 2009 (SJVAPCD 2009b). In addition, SJVAPCD adopted a Climate Change Action Plan to identify strategies to reduce GHG emissions in the SJVAPCD (SJVAPCD 2009c). SJVAPCD’s methodology includes a tiered approach:
 If a project is exempt from CEQA, individual-level and cumulative GHG emissions are treated as less than significant.
 If the project complies with a GHG emissions reduction plan or mitigation programs that avoid or substantially reduce GHG emissions in the geographic area where the project is located (i.e., city or county), individual-level and cumulative GHG emissions are treated as less than significant.  SJVAPCD does not have thresholds of significance for construction-related GHG emissions. Construction emissions are one-time, nonrecurring emissions. For buildings in general, it is reasonable to look at a 30- year time frame, since this is a typical interval before a new building requires its first major renovation (IEA 2008). Therefore, construction emissions are amortized over a 30-year duration and included in the operational emissions analysis.

SJVAPCD’s methodology for evaluating GHG emissions impacts also includes methodology to evaluate whether a project would comply with AB 32 by conducting an analysis of whether the project would reduce GHG emissions by 29 percent from business as usual through implementation of “best performance standards.” The November 30, 2015, Center for Biological Diversity v. California Department of Fish and Wildlife

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds
May 2026 Page 59
(Newhall Ranch) ruling effectively limits use of this performance metric. The 29 percent below business as usual established in the CARB Scoping Plan is derived from the statewide reduction target set by AB 32 for year 2020. The court held that the 29 percent is the statewide goal, but there is no substantial evidence that establishes a nexus between the statewide goal and the percentage reduction a specific land use project would need to achieve to be consistent with the goals of AB 32. Projects must determine the reduction target specific to the land use type being proposed.

Because SJVAPCD’s significance criteria do not establish a nexus that connects the statewide GHG emissions reductions identified in the Scoping Plan to reductions needed for new development projects, an alternate approach to use of the performance metric is utilized until SJVAPCD revises their Guidance Methodology to address the Newhall Ranch ruling. For purposes of this analysis, the proposed project is evaluated to a net zero threshold to determine potential GHG emissions impacts. While this net zero threshold approach is conservative, it aligns with the State’s carbon neutrality goal under AB 1279.

4.2.2.1 MASS EMISSIONS AND HEALTH EFFECTS
On December 24, 2018, in Sierra Club et al. v. County of Fresno et al. (Friant Ranch), the California Supreme Court determined that the EIR for the proposed Friant Ranch project failed to adequately analyze the project’s air quality impacts on human health. The EIR prepared for the project, which involved a master planned retirement community in Fresno County, showed that project-related mass emissions would exceed the SJVAPCD’s regional significance thresholds. In its findings, the California Supreme Court affirmed the holding of the Court of Appeals that EIRs for projects must not only identify impacts to human health but provide an “analysis of the correlation between the project's emissions and human health impacts” related to each criteria air pollutant that exceeds the regional significance thresholds or explain why it could not make such a connection. In general, the ruling focuses on the correlation of emissions of toxic air contaminants and criteria air pollutants and their impact to human health.

In 2009, the EPA issued an endangerment finding for six GHGs (CO2, CH4, N2O, HFCs, PFCs, and SF6) in order to regulate GHG emissions from passenger vehicles. The endangerment finding is based on evidence that shows an increase in mortality and morbidity associated with increases in average temperatures, which increase the likelihood of heat waves and ozone levels. The effects of climate change are identified in Table 5.

While identified effects such as sea level rise and increases in extreme weather can indirectly impact human health, neither the EPA nor CARB has established ambient air quality standards for GHG emissions. The state’s GHG reduction strategy outlines a path to avoid the most catastrophic effects of climate change. Yet the state’s GHG reduction goals and strategies are based on the state’s path toward reducing statewide cumulative GHGs as outlined in AB 32, SB 32, AB 1279, and Executive Order S-03-05. Because no single project is large enough to result in a measurable increase in global concentration of GHG emissions, climate change impacts of a project are considered on a cumulative basis. Without federal ambient air quality standards for GHG emissions and given the cumulative nature of GHG emissions, it is not feasible at this time to connect the project’s specific GHG emission to the potential health impacts of climate change.

RIVERVIEW MARKET PROJECT AIR QUALITY , GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

4. CEQA Thresholds

Page 60 ends

This page intentionally left blank.

May 2026 Page 61

5. Environmental Impacts

5.1 METHODOLOGY
This air quality, GHG, and energy evaluation was prepared in accordance with the requirements of CEQA to determine if significant air quality impacts are likely in conjunction with the type and scale of development associated with the proposed project. Air pollutant and GHG emissions are calculated using the California Emissions Estimator Model (CalEEMod), version 2022.1. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only).

The analysis of electricity and natural gas usage for the proposed project is based on CalEEMod version 2022.1, which quantifies energy use associated with the proposed land uses. In addition, fuel consumption data from EMFAC2021 version 1.0.2 and OFFROAD version 1.1.3. are used to quantify fuel usage related to construction equipment operation and construction- and operation-related vehicle trips (e.g., construction worker trips and patron vehicle trips).

The operational-phase, project-related emissions are based on development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed project. Construction emissions are based on information provided for the project. Where specific information was not available, CalEEMod default values were utilized. Life cycle emissions are not included in this analysis because not enough information is available. 8
 Transportation. The project-related weekday and weekend average daily trip generation data and vehicle miles traveled (VMT) data are provided by Integrated Engineering Group (IEG 2026). Project-related VMT including those associated with light-, medium-, and heavy-duty trucks, was calculated using the KernCOG regional travel demand model, which, in general, is calibrated to account for truck travel distinct from travel associated with passenger vehicles. Transportation criteria pollutant and GHG emissions are based on CalEEMod default vehicle emissions. The modeled fleet mix is based on vehicle fleet mix data provided by IEG and CalEEMod default fleet mix data. The primary source of mobile criteria air pollutants and GHG emissions is tailpipe exhaust emissions from the combustion of fuel (i.e., gasoline and diesel). In 8 Life cycle emissions include indirect emissions associated with materials manufacture. However, these indirect emissions involve numerous parties, each of which is responsible for GHG emissions of their particular activity. The California Resources Agency, in adopting the CEQA Guidelines Amendments on GHG emissions found that lifecycle analysis was not warranted for project-specific CEQA analysis in most situations, for a variety of reasons, including lack of control over some sources, and the possibility of double-counting emissions (see Final Statement of Reasons for Regulatory Action, December 2009). Because the amount of materials consumed during the operation or construction of the proposed project is not known, the origin of the raw materials purchased is not known, and manufacturing information for those raw materials is also not known, calculation of life cycle emissions would be speculative. A life-cycle analysis is not warranted (LCI 2008).

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 62 ends

addition, for criteria air pollutants, brake and tire wear along with fugitive dust created from vehicles traveling roadways also generate particulate matter.
 Energy Use. Electricity and natural gas demand for the proposed project is based on CalEEMod default energy rates. Per the project applicant, the proposed onsite PV systems would generate an anticipated 1,201,933 kilowatt hour (kWh) per year of renewable electricity. For purposes of this analysis, the CalEEMod default electricity demand for the regional shopping center land use is reduced by the anticipated 1,201,933 kWh per year of renewable electricity. Use of natural gas would generate both criteria pollutant and GHG emissions, and use of electricity would contribute to GHG emissions generation.  Water/Wastewater. Water demand data for the proposed project is based on and derived from the water supply and demand analysis prepared by PlaceWorks (2026). In total, the proposed project is estimated to use 148,925 gallons per day and 54,357,625 gallons per year. GHG emissions from this sector are attributed to the electricity used for treatment and distribution of water and wastewater.  Solid Waste. Solid waste generation for the proposed uses is based on CalEEMod defaults. GHG emissions are associated with the decomposition of solid waste.  Area Sources. Area source emissions from use of consumer cleaning products and VOC emissions from paints are based on CalEEMod default values and the square footage of the proposed buildings.  Refrigerants. GHG emissions from operation of building air conditioning and refrigeration equipment are based on CalEEMod default values based on land use type.  Construction. For purpose of this analysis and based on information provided by the project applicant, construction of the proposed project is modeled to commence in March of 2026 and be completed by July of 2027, a duration of approximately 16 months. Phase 1 construction is modeled to occur from March 2026 to end of December 2026, and Phase 2 construction is modeled to occur from January 2027 to July 2027. The proposed left turn lane and traffic signal would be installed June 2026 to August 2026 and July 2026 to September 2026, respectively. Appendix A to this technical study shows the assumed construction activities, phasing, and construction equipment based on information provided by the project applicant and CalEEMod defaults. Demolition debris generated from the left turn lane installation would result in the export of 575 tons of demolition debris. The project site would be a balanced site and site preparation and grading activities would not result in export or import of soil. Emissions of VOCs would primarily be from the application of paints, asphalt pavement, and operation of construction vehicles and off-road equipment. Emissions of NOX, CO, and SOX would primarily be generated from operation of off-road construction equipment as well as construction worker and vendor vehicles. Coarse and fine particulate matter (PM10 and PM2.5) exhaust emissions would also be generated from operation of off-road construction equipment and construction and vendor vehicle trips. Fugitive dust emissions of PM10 and PM2.5 would be generated from ground disturbance activities and asphalt demolition.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 63

5.2 ENVIRONMENTAL IMPACTS

5.2.1 Air Quality Impacts
This section discusses the potential project impacts related to air quality.

AIR-1 Would the proposed project conflict with or obstruct implementation of the applicable air quality plan?
Impact Analysis: The following describes potential air quality impacts and consistency of the proposed project with the air quality management plans (AQMPs) developed by the SJVAPCD (see section 2.1.2.2).

The SJVAPCD is responsible for reducing emissions from area, stationary, and mobile sources in the SJVAB to achieve the National and California AAQS. A consistency determination with the AQMPs plays an important role in local agency project review by linking local planning and individual projects to the AQMPs. It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in the AQMPs.

Kern COG is one of SJVAPCD’s partners in the preparation of the AQMPs, providing the latest economic and demographic forecasts and developing transportation measures in Kern County. Regional population, housing, and employment projects developed by Kern COG are based, in part, on a city’s general plan land use designations. These projections form the foundation for the emissions inventory of the AQMPs and are incorporated into the regional transportation plan/sustainable communities strategy (RTP/SCS) prepared by Kern COG to determine priority transportation projects and vehicle miles traveled in the Kern COG region.

Because the AQMPs’ strategies are based on projections from local general plans, projects that are consistent with the local general plan are considered consistent with the air quality-related regional plan. Additionally, only large projects have the potential to substantially affect the demographic forecasts in the AQMPs.

The proposed land uses are not permitted under the existing P land use designation. A general plan amendment would be required to change the land use designation from P to LI to allow for all uses permitted under a commercial designation.

Also, under CEQA Guidelines Section 15206(b), a proposed project is considered of statewide, regional, or area-wide significance if the project is a commercial office building of 250,000 square feet or more or employs 1,000 or more employees and/or a shopping center of 500,000 square feet or more or employs 1,000 or more employees. The proposed project would develop a shopping center with up to 8,996 building square feet (BSF) of medical office space and 396,535 BSF of retail space and is projected to generate 969 jobs (IEG 2026). The amount of retail space proposed and the projected number of new jobs generated would be less than 500,000 square feet and 1,000 employees. Thus, the proposed project would not substantially affect demographic projections beyond what is accounted for in the AQMPs.

However, per SJVAPCD guidance, project consistency with the AQMPs is based on whether project emissions would exceed the SJVAPCD regional significance thresholds shown in Table 9. As discussed in Impact AIR-2,

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 64 ends

the proposed project would exceed the regional operation significance thresholds for VOC and NOX and would cumulatively contribute to the nonattainment designations in the SJVAB without mitigation. Therefore, overall, the proposed project would be considered inconsistent with the AQMPs.

AIR-2 Would the proposed project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in nonattainment under an applicable federal or state ambient air quality standard?
Regional Construction Emissions
Construction activities associated with the proposed project would temporarily increase PM10, PM2.5, VOC, NOX, SOX, and CO regional emissions in the SJVAB. The primary source of NOX, CO, and SOX emissions is the operation of construction equipment. The primary sources of particulate matter (PM10 and PM2.5) emissions are activities that disturb the soil, such as grading and excavation, asphalt demolition, and building construction. The primary source of VOC emissions is the application of architectural coating and off-gas emissions associated with asphalt paving.

Construction air pollutant emissions are based on the preliminary construction information provided by the project applicant and CalEEMod defaults. Construction would entail site preparation, grading, utility trenching, construction of the proposed buildings, architectural coating, and asphalt paving. The proposed project would also include installation of a left-turn lane on Rosedale Highway in addition to the installation of a traffic signal in the southeast corner of Coffee Road and Jet Way. An estimate of maximum daily construction emissions for the proposed project is provided in Table 14, Annual Regional Construction Emissions.

Table 14 Annual Regional Construction Emissions
Construction Year
Criteria Air Pollutants
(tons per year)
VOC1 NOX CO SOX PM10 PM2.5
Phase 1
Year 2026 1 1 1 <1 <1 <1
Maximum Annual Emissions 1 1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Phase 2
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual Emissions <1 <1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Left Turn Lane
Year 2026 <1 <1 <1 <1 <1 <1
Maximum Annual Emissions <1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Traffic Signal
Year 2026 <1 <1 <1 <1 <1 <1

I I I I I

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 65
Table 14 Annual Regional Construction Emissions
Construction Year
Criteria Air Pollutants
(tons per year)
VOC1 NOX CO SOX PM10 PM2.5
Maximum Annual Emissions <1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Overall Project Buildout2
Year 2026 1 1 2 <1 <1 <1
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual Emissions 1 1 2 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Source: CalEEMod Version 2022.1.
1 The proposed project would include 601,224 square feet of surface parking lot asphalt paving and 462,790 square feet of non-parking lot asphalt paving for a total of 1,063,714 square feet of asphalt surfaces. However, the modeled VOC emissions results shown in this table are based on 1,485,982 square feet of asphalt surfaces and represents a conservative estimate. 2 Includes Phase 1 and 2 and the off-site improvements (i.e., left turn lane and traffic signal).

As shown in Table 14, construction activities associated with the proposed project would not result in short-term emissions that would exceed the SJVAPCD regional thresholds for any of the air quality pollutants. Thus, construction of the proposed project would not result in emissions that cumulatively contribute to the nonattainment designations of the SJVAB.

Ambient Air Quality
The SJVAPCD requires dispersion modeling for projects that result in average daily construction-related emissions that exceed the screening criteria of 100 pounds per day. As shown in Table 15, Average Daily Construction-Related Emissions, the project-related construction activities would not generate emissions that would exceed the 100 pounds per day screening criteria. Therefore, project-related construction activities would not cause or contribute to a violation of the ambient air quality standards.

Table 15 Average Daily Construction-Related Emissions
Construction Phase
Criteria Air Pollutants
(pounds/day)1
VOC NOX CO SO2 PM10 PM2.5
Phase 1 Construction Related Emissions2 11 8 14 <1 2 1
Phase 2 Construction Related Emissions3 5 6 12 <1 2 <1
Left Turn Lane Construction Related Emissions4 <1 3 4 <1 1 <1 Traffic Signal Construction Related Emissions5 <1 <1 1 <1 <1 <1 Overall Project Construction Related Emissions6 8 8 14 <1 2 1 SJVAPCD Ambient Air Quality Screening Threshold 100 100 100 100 100 100 Exceeds Thresholds? No No No No No No
Source: CalEEMod Version 2022.1.
1 Based on the preliminary information provided by the project applicant. Where specific information regarding project-related construction activities was not available, construction assumptions were based on CalEEMod defaults, which are based on construction surveys conducted by South Coast AQMD of construction equipment and phasing for comparable projects. 2 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 206 days.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 66 ends

3 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 145 days. 4 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 31 days. 5 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 40 days. 6 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 351 days.

Operational
Regional Emissions
Operation of the proposed project would generate criteria air pollutant emissions from area sources (e.g., landscaping equipment, architectural coating) and energy (i.e., natural gas used for heating and cooking).

Table 16, Annual Regional Operation Emissions, shows the criteria pollutant emissions that would be generated by each development phase as well as full buildout of the proposed project. As shown in the table, operation of the proposed project at full buildout would result in exceedance of the SJVAPCD regional emissions threshold for VOC and NOX, primarily due to project-related mobile-sources. Both VOC and NOX are ozone precursors.

NOX is also a precursor to the formation of particulate matter (PM10 and PM2.5). Thus, emissions of VOC and NOX that exceed the respective SJVAPCD regional thresholds would cumulatively contribute to the O3, PM10, and PM2.5 nonattainment designations of the SJVAB. Therefore, without any reduction measures, operation of the proposed project would contribute to the nonattainment designation of the SJVAB.

Table 16 Annual Regional Operation Emissions
Source
Criteria Air Pollutants
(tons per year)
VOC NOx CO SO2 PM10 PM2.5
Phase 1 (2026 Opening Year)
Mobile1,2 12 9 64 <1 12 3
Area 2 <1 1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 13 9.7 65 <1 12 3
Phase 2 (2027 Opening Year)
Mobile1,3 1 1 8 <1 2 <1
Area <1 <1 <1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 2 1 8 <1 2 <1
Full Buildout (2027 Full Buildout Year)
Mobile1,3 13 10 68 <1 13 3
Area 2 <1 2 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 15 10.3 70 <1 13 4
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Source: CalEEMod Version 2022.1.
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.

I I I I I

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 67
Ambient Air Quality Analysis
The SJVAPCD requires dispersion modeling for projects that result in average daily operation-related emissions that exceed the average daily emissions screening criteria of 100 pounds per day. As shown in Table 17, Average Daily Operation-Related Emissions, the project-related operation-phase activities under full buildout conditions would result in average daily emissions that would exceed the 100 pounds per day screening criteria for CO.

Table 17 Average Daily Operation-Related Emissions
Operation Phase
Criteria Air Pollutants
(pounds per day)1
VOC NOX CO SO2 PM10 PM2.5
Operation Related Emissions 80 56 385 1 73 19
SJVAPCD Ambient Air Quality Screening Threshold 100 100 100 100 100 100 Exceeds Thresholds? No No Yes No No No
Source: CalEEMod Version 2022.1.
1 The average daily emissions are calculated by dividing the annual emissions by 365 days, which is the assumed number of workdays the project would operate annually.

In accordance with SJVAPCD methodology, because the proposed project would result in exceeding the ambient air quality screening threshold for CO, dispersion modeling was conducted using AERMOD, version

13.0. The calculated concentration levels associated with project operation are shown in Table 18, Ambient Air Quality Analysis Summary. The modeling output and emissions calculations for the ambient air quality analysis is provided in Appendix D (3&4) of this report.

Table 18 Ambient Air Quality Analysis Summary
Pollutant
Averaging
Period
Background
µg/m3
Project Operation
µg/m3
Project +
Background
NAAQS
µg/m3
CAAQS
µg/m3
NO2
1-hour 96.3 0.69 97.0 188.7 339
Annual 62.8 0.13 63.0 100 57
CO
1-hour 1,664 55.6 1,719 40,000 23,000
8-hour 916 37.4 953 10,000 10,000
SO2
1-hour 77.3 0.10 77.4 196 655
3-hour 50.0 0.09 50.1 1,300 n/a
24-hour 11.3 0.05 11.3 365 105
Annual 7.07 0.04 7.11 n/a n/a
PM10
24-hour 93.0 3.74 96.7 150 50
Annual 49.6 1.69 51.3 n/a 20
PM2.5
24-hour 37.2 1.07 38.3 35 n/a
Annual 12.90 0.48 13.38 12 12
Notes: Bold = Value exceeds either the NAAQS and/or CAAQS; Ambient air quality analysis modeling output provided in Appendix D (3&4); NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter As shown in Table 18, project-related operation activities would not generate emissions that would result in concentrations exceeding the ambient air quality standards for NO2 (1-hour), SO2 and CO when added to background concentrations. However, background concentrations of NO2 (Annual), PM10, and PM2.5 already

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 68 ends

exceed the AAQS. For these pollutants, the SJVAPCD has developed significant impact levels to determine whether a project’s contribution will contribute significantly to an AAQS exceedance. Table 19, Comparison of Concentrations to Significant Impact Levels, compares the incremental increase in NO2, PM10, and PM2.5 concentrations resulting from project operations to the SJVAPCD significant impact levels. The project’s modeled NO2, PM10, and PM2.5 concentrations are below the SJVAPCD significance levels for 24-hour and annual average concentrations.

Table 19 Comparison of Concentrations to Significant Impact Levels Pollutant
Averaging
Period
Project Operation
µg/m3
SIL
µg/m3
NO2 Annual 0.13 1.0
PM10
24-hour 3.73 10.4
Annual 1.69 2.08
PM2.5
24-hour 1.07 2.5
Annual 0.48 0.63
Note: Ambient Air Quality Analysis modeling output provided in Appendix D (3&4). SIL = significant impact level; μg/m3 = micrograms per cubic meter
AIR-3 Would the proposed project expose sensitive receptors to substantial pollutant concentrations?
Construction and operation of the proposed project could generate new sources of criteria air pollutants and TACs. The following describes potential localized air quality impacts from implementation of the proposed project to the nearby off-site sensitive receptors.

Operational Phase Health Risks to Off-Site Receptors
The types of land uses that typically generate substantial quantities of TACs are industrial (permitted stationary sources) and warehousing (truck idling) land uses. These types of major air pollutant emissions sources are not proposed under the project. The proposed project would develop retail and commercial (e.g., medical office, self-storage, and health club) land uses. Operation of the proposed uses could include occasional use of landscaping equipment and natural gas consumption for heating. However, air pollutant emissions generated from these activities would be nominal.

The proposed project would include a gas station with up to 40 fuel dispensers. CARB recommends avoiding siting gas stations within 500 feet of sensitive land uses to avoid exposing sensitive receptors to substantial concentration of air pollutants (CARB 2005). The nearest potential sensitive land uses to the proposed gas station would be the two buildings across El Toro Viejo Road, approximately 650 feet to the west, which would be outside the 500-foot buffer. Furthermore, emissions of TACs from stationary sources that may be associated with the proposed uses (e.g., restaurant chain-driven char broiler), including the proposed gas station, would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits under SJVAPCD Regulation II. Regulation II would ensure that stationary source emissions (permitted sources) would be reduced or mitigated below SJVAPCD significance thresholds of 20 in one million cancer risk and one for acute risk at the maximally exposed individual.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 69
In addition to stationary sources, the proposed project could generate heavy-duty trucks associated with the delivery of goods and supplies to the proposed retail and commercial uses, which would result in heavy-duty truck travel along the local roadways. Per City of Bakersfield Municipal Code Section 10.44.060, Truck Routes Established—Signs—Parking Restrictions, Rosedale Highway and Coffee Road are designated truck routes.

Based on the project site location, it is anticipated that any project-related heavy-duty truck travel would primarily occur on these two roadways. Per CARB land use siting guidelines, it is recommended to avoid siting sensitive land uses within 500 feet of urban roadways and freeways with 100,000 vehicles per day, or rural roads with 50,000 vehicles per day to avoid exposing sensitive receptors to substantial concentration of air pollutants (CARB 2005). Overall, while the proposed project could generate heavy-duty truck travel along the local roadways, the proposed project would only incrementally increase average daily trips for all vehicle types (i.e., passenger vehicles, heavy-duty trucks, etc.) by up to 5,934 average daily trips along the local roadways (see Appendix A). Because the proposed project would not have any warehousing uses and would primarily consist of retail, restaurant, and commercial uses, it anticipated that project-related traffic volumes would primarily consist of passenger vehicles associated with patrons. Thus, the incremental increase in vehicle trips that could result from implementation of the proposed project would be below roadway volumes identified by the CARB land use siting screening criteria to avoid exposing sensitive receptors to substantial concentration of air pollutants from vehicles traveling along roadway. Therefore, operation of the proposed project would not expose nearby off-site sensitive receptors to substantial concentrations of TACs.

CO Hotspots
Areas of vehicle congestion have the potential to create pockets of CO called hotspots. These pockets have the potential to exceed the State 1-hour standard of 20 ppm or the 8-hour standard of 9.0 ppm. Because CO is produced in greatest quantities from vehicle combustion and does not readily disperse into the atmosphere, adherence to AAQS is typically demonstrated through an analysis of localized CO concentrations. Hotspots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. However, emissions from motor vehicles, the largest source of CO emissions, have been declining since 1985, despite increases in VMT, due to the introduction of new automotive emission controls and fleet turnover (SJVAPCD 2015b). Furthermore, under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection to more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact (BAAQMD 2023). 9 Buildout of the proposed project would generate up to 1,183 peak-hour trips (IEG 2026). Overall, implementation of the proposed project would result in overall peak hour turning volumes between 352 to 6,865 for the intersections considered in the traffic study and would not produce the volume of traffic required to generate a CO hotspot (IEG 2026).10 Therefore, implementation 9 The CO hotspot analysis refers to the modeling conducted by the Bay Area Air Quality Management District (BAAQMD) for its CEQA Guidelines, which considers the improvement in mobile-source CO emissions. The modeling conducted by BAAQMD demonstrates that the net increase in peak hour traffic volumes at an intersection in a single hour would need to be substantial.

This finding is consistent with the CO hotspot analysis South Coast Air Quality Management District prepared as part of its 2003 Air Quality Management Plan (South Coast AQMD 1992; South Coast AQMD 2003) to provide support in seeking CO attainment for the South Coast Air Basin (SoCAB). Based on the analysis prepared by South Coast AQMD, no CO hotspots were predicted for the SoCAB. The analysis included some of Los Angeles’ busiest intersections, with daily traffic volumes of 100,000 or more peak hour vehicle trips operating at LOS E and F. 10 See Figure 5-2a, Year 2028 With Project Phases I–II Peak Hour Volumes, of the Riverview Market Transportation Analysis (IEG 2026).

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 70 ends

of the proposed would not have the potential to substantially increase CO hotspots at intersections in the vicinity of the project site.

Construction Health Risks to Off-Site Receptors
Project-related construction activities would temporarily elevate concentrations of TACs and DPM in the vicinity of sensitive land uses. The primary sources of TACs and DPM would be exhaust generated from construction off-road equipment and construction vendor and haul-truck trips. The proposed project would be developed in two development phases over an approximately 16-month duration from March 2026 to July 2027. The estimated excess lifetime cancer risk and chronic noncancer hazard index at the nearest sensitive receptors are shown in Table 20, Construction Risk Summary.

Table 20 Construction Risk Summary
Receptor Cancer Risk (per million) Chronic Hazards
Maximum Exposed Individual Resident 1.5 0.003
Maximum Exposed Individual Worker 0.3 0.031
SVJAPCD Significance Thresholds 20 1.0
Exceeds Threshold? No No
Note: Cancer risk calculated using 2015 OEHHA HRA guidance (OEHHA 2015).

The results of the HRA are based on the maximum modeled receptor concentration over the construction exposure period, conservatively assuming a 24-hour per day outdoor exposure and averaged over a 70-year lifetime. The maximum exposed individual resident (MEIR) and worker (MEIW) are shown in Figure 3, Project Sources and Off-Site Receptor Locations.

As shown in Table 20, the maximum incremental cancer risk levels during the construction phase of the project at the MEIR and MEIW are 1.5 per million and 0.3 per million, respectively, which would not exceed the cancer risk significance threshold of 20 in one million. For noncarcinogenic effects, the hazard index identified for each toxicological endpoint totaled less than one for the MEIR and MEIW. Therefore, chronic noncarcinogenic hazards are within acceptable limits, and project-related construction activities would not expose nearby sensitive receptors to substantial pollutant concentrations.

AIR-4 Would the proposed project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
The following discusses potential odor impacts associated with development and operation of the proposed project. Due to the subjective nature of odor impacts, the number of variables that can influence the potential for an odor impact, and the variety of odor sources, there are no quantitative or formulaic methodologies to determine if potential odors would have a significant impact. Rather, projects must be assessed on a case-by-case basis. In general, odors from the types of land uses that could generate objectionable odors (see Table 12, SJVAPCD Screening Levels for Potential Odor Sources) are regulated under Regulation IV, Prohibitions, Rule 4102, Nuisance, which states:

PlaceWorks
S
Y
ource: Nearmap, Inc., 2023.
0 Scale (Feet)
1,000
Figure 3 - Project Sources and Off-site Receptor Locations Pink Lady
Wy
Firant-Kern Canal

RIVERVIEW MARKET PROJECT AIR QUALITY, GREENHOUSE GAS EMISSIONS, AND ENERGY TECHNICAL STUD CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION Project Boundary
Truck Route
Receptors (Residential)
Maximum Exposed
Individual Resident (MEIR)
Receptors (Worker) Development Area
Maximum Exposed
Individual Worker (MEIW)
Coffee Frontage Rd
Rosedale Hwy
El Toro Viejo Rd
Ribston Ave
Wolf River Ave
Bolero A
Belmac Ave
Telestar Ave
Calloway Dr
Max Dr
Wheeler St
Greenacres Dr
Holland St
Seabeck Ave
Flushing Quail Rd
Jenna Kathryn Dr
Cape Flattery Dr
Granite Falls Dr
Henry Ln
Shofner Ave
Patton Wy
Jet Wy
Wedding Wy
Charity
Ave
Coffee Rd
Langley Rd
Delbert St
Mcintosh Wy
Crispin St
Art St
Elzworth St
Calloway Ct
Calloway Frontage Rd
New Left Lane Pocket
New Traffic Signal
Jet Wy
2 n ।

OO O O O OO
△ AAA "I
7 A A A A A AA A A
AA shi e eg f
FA

A A A A A
• ‘0 9
fR “ta - 40
p
06 AAA L
4 AAA I
t AAA
I 3 SPP AA
> 7
1 I a
y ' 4.2 V
A
A
at
•5 TSS d
eh "l dd no V K
cymode s m2 ®
V 2aaas
*
-mele
l j: t
I
I
|
mF (D El
s<r
A
I
I
/ /
' a
4 b
*
1 I
rr
l.

I
- ITO.
2»
B
1".

Dee
“Paa-slWE
A
A
AAAA
A AAAA
! I
; I
A AA A
. , -i —— A
"Mk, ‘
-----
J —— —=
T5
J
7 P
5 2—
—- 4.}
a
i
__________
eoltch
crU9
-
■■ AAAA AA
ralt e
0003200/00 °
AAAA

AAAA AA
e"oaLLuus
1 Tee: .1.

J
[ ]
0 o
8}
qq< 23 o o
O OO o o
<2 22 <| o OO o o IL LD 8 90 I» y5 OO o
— ?
OO ie: it
o ooooooo
o ooooooo
O
“
3 a < <1 e.
55 LAS Ir l 2a,ss i 22
f 3
; * If a
—
L 541" Igs lNa
2Th
—i
$ ats
OOOOOO
ooooooo
>
o
0Th
o OOo OO
3 0Trn
ose
- ■■
00000000D
OO ooooooo
ive

8. U el
ADt
JCo)

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 72 ends

This page intentionally left blank.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 73
A person shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property.

The type of facilities that are considered to have objectionable odors include wastewater treatment plants, compost facilities, landfills, solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and food manufacturing facilities. The uses proposed by the project do not fall within these land uses. During project-related construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily generate odors. However, any construction-related odor emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reached any sensitive receptor, they would be diluted to well below any level of air quality concern. Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of odor-producing materials. Thus, overall, construction and operation of the proposed project are not expected to generate odors that would adversely affect a substantial number of people.

5.2.2 Greenhouse Gas Emissions Impacts
This section discusses the potential project impacts related to GHG emissions.

GHG-1 Would the proposed project generate a net increase in GHG emissions, either directly or indirectly, that would have a significant impact on the environment? Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough greenhouse gas emissions on its own to influence global climate change significantly; hence, the issue of global climate change is by definition a cumulative environmental impact.

Operation of the proposed project would generate GHG emissions from vehicle trips, water demand, wastewater and solid waste generation, area sources (e.g., consumer cleaning products), energy usage (i.e., natural gas and electricity), and refrigerants. The project operational emissions for each phase of development and full buildout are shown in Table 21, Project Operation GHG Emissions Inventory. As shown in the table, the primary source of project-related emissions would be from mobile-source emissions generated from project vehicle trips (e.g., employees and patrons). The next largest sources of emissions would be from energy usage, followed by the solid waste and water sectors. Overall, development of the proposed project would generate annual operational phase GHG emissions of 16,027 MTCO2e per year under full buildout year conditions and would not achieve net zero GHG emissions. Compliance with SJVAPCD’s Rule 9410 eTRIP program for individual businesses in which the program would apply could contribute to reducing project-related vehicle trips and mobile sources to the extent feasible. However, it is not anticipated that compliance with Rule 9410 would result in the reductions needed to achieve net zero for the proposed project. Overall, GHG emissions

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 74 ends

generated by the proposed project would be considered to cumulatively contribute to statewide GHG emissions.

Table 21 Project Operation GHG Emissions Inventory
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Phase 1 (2026 Opening Year)
Mobile1,2 13,481 94%
Area 5 <1%
Energy 644 4%
Water 75 1%
Solid Waste 194 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 12 <1%
Total All Sectors 14,431 100%
Phase 2 (2027 Opening Year)
Mobile1,3 1,709 91%
Area 1 <1%
Energy 128 7%
Water 19 1%
Solid Waste 29 2%
Refrigerants <1 <1%
Amortized Construction (30-years) 6 <1%
Total All Sectors 1,892 100%
Full Buildout (2027 Opening Year)
Mobile1,3 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.

GHG-2 Would the proposed project conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs?
Applicable plans adopted for the purpose of reducing GHG emissions include CARB’s Scoping Plan and Kern COG’s RTP/SCS. A consistency analysis with these plans is presented below.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 75
CARB Scoping Plan
The CARB Scoping Plan is applicable to state agencies but is not directly applicable to cities/counties and individual projects (i.e., the Scoping Plan does not require the City to adopt policies, programs, or regulations to reduce GHG emissions). However, new regulations adopted by the state agencies outlined in the Scoping Plan result in GHG emissions reductions at the local level. As a result, local jurisdictions benefit from reductions in transportation emissions rates, increases in water efficiency in the building and landscape codes, and other statewide actions that affect a local jurisdiction’s emissions inventory from the top down. Statewide strategies to reduce GHG emissions include the LCFS and changes in the corporate average fuel economy standards (e.g., Pavley I and Pavley California Advanced Clean Cars program).

The proposed project would adhere to the programs and regulations identified by the Scoping Plan and implemented by state, regional, and local agencies to achieve the statewide GHG reduction goals of AB 32 and SB 32. For example, new buildings under the proposed project would be required to, at minimum, meet the current CALGreen and Building Energy Efficiency Standards. The proposed project would install on-site PV systems to generate renewable electricity (anticipated 1,201,933 kWh/yr), which would be in compliance with the PV requirements under Section 140.10 of the Building Energy Efficiency Standards. Additionally, the proposed project would include electric vehicle (EV) parking in compliance with the CALGreen EV parking requirements. Installation of the proposed PV systems and EV parking spaces would contribute to achieving the building decarbonization and transportation electrification strategies of the Scoping Plan. Overall, development of the proposed project would not obstruct implementation nor be inconsistent with the CARB Scoping Plan.

Kern COG’s Regional Transportation Plan/Sustainable Communities Strategy The Kern COG 2022 RTP/SCS transportation projects help more efficiently distribute population, housing, and employment growth, and forecast development is generally consistent with regional-level general plan data to promote active transportation and reduce GHG emissions. The projected regional development, when integrated with the proposed regional transportation network in the 2022 RTP/SCS, would reduce per-capita GHG emissions related to vehicular travel and achieve the GHG reduction per capita targets for the Kern COG region. The 2022 RTP/SCS does not require that local general plans, specific plans, or zoning be consistent with the SCS, but provides incentives for consistency to governments and developers.

The proposed project would result in the development of a shopping center that would provide retail and commercial uses within the interior area of the City of Bakersfield. A VMT analysis was prepared in accordance with Senate Bill 743 to evaluate potential VMT impacts of the project (GTS 2025). Per the analysis, the proposed project would result in an overall net increase in countywide roadway VMT under both existing and cumulative conditions. Additionally, the proposed medical office use would exceed the applicable VMT per employee threshold. Therefore, the proposed project would be inconsistent with the overall goal of the Kern COG 2022 RTP/SCS in reducing per capita GHG emissions related to passenger vehicle travel and would interfere with Kern COG’s ability to implement the 2022 RTP/SCS.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 76 ends

5.2.3 Energy Impacts
This section discusses the potential project impacts related to energy.

ENE-1 Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation. [Threshold E-1])?
Short-Term Construction Impacts
Construction of the proposed project would create temporary increased demands for electricity and vehicle fuels compared to existing conditions and would result in short-term, energy use from off-road mobile equipment and on-road vehicles.

Construction Equipment Electrical Energy
Construction of the proposed project would not require electricity to power most construction equipment.

Electricity use during construction of the proposed project would vary during different phases of construction.

The majority of construction equipment would be gasoline or diesel powered. Later construction phases (e.g., vertical building construction) could result in the use of electricity-powered equipment for interior construction and architectural coatings. However, while not quantified, it is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Additionally, it is anticipated that such equipment would be used on an as-needed basis. Therefore, project-related construction activities would not result in wasteful or unnecessary electricity demands.

Construction Equipment Natural Gas Energy
It is not anticipated that construction equipment used for the proposed project would be powered by natural gas, and no other natural gas demand is anticipated during construction. Therefore, project-related construction activities would not result in wasteful or unnecessary natural gas usage.

Off-Road and On-Road Transportation Energy
Transportation energy use during construction of the proposed project would come from delivery vehicles, haul trucks, and construction employee vehicles as well as off-road construction equipment. It is anticipated that the majority of off-road construction equipment, such as what is used during demolition and grading, would be gas or diesel powered. The use of energy resources by these vehicles would fluctuate according to the phase of construction. Fuel consumption during construction (years 2026 through 2027) was calculated based on fuel consumption data from the EMFAC2021 (v. 1.0.2) and OFFROAD (v. 1.1.3) databases. The results are shown in Table 22, Construction-Related Fuel Usage.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 77
Table 22 Construction-Related Fuel Usage
Project Component
Gas Diesel Electricity
VMT Gallons VMT Gallons VMT kWh
Construction Worker Commute
Phase 1 317,886 12,000 452 12 9,053 3,299
Phase 2 196,259 7,261 266 7 6,280 2,290
Left Turn Lane 317,886 12,000 452 12 9,053 3,299
Traffic Signal Installation 196,259 7,261 266 7 6,280 2,290 Subtotal 522,393 19,572 729 19 15,568 5,675
Construction Vendor Trips
Phase 1 3,516 733 50,463 6,922 0 0
Phase 2 1,067 220 15,980 2,160 0 0
Left Turn Lane 3,516 733 50,463 6,922 0 0
Traffic Signal Installation 1,067 220 15,980 2,160 0 0
Subtotal 4,676 972 67,769 9,264 0 0
Construction Truck Haul and Onsite Truck Trips
Phase 1 0 0 25 4 0 0
Phase 2 0 0 23 4 0 0
Left Turn Lane 0 0 25 4 0 0
Traffic Signal Installation 0 0 23 4 0 0
Subtotal 0 0 2,947 467 0 0
Construction Off-Road Equipment
Phase 1 N/A 744 N/A 10.265 N/A 0
Phase 2 N/A 272 N/A 8,350 N/A 0
Left Turn Lane N/A 14 N/A 625 N/A 0
Traffic Signal Installation N/A 0 N/A 167 N/A 0
Subtotal N/A 1,030 N/A 19,827 N/A 0
Total 527,069 21,574 71,446 29,578 15,568 5,675
Sources: EMFAC2021 v; 1.0.2; OFFROAD v. 1.1.3.

Notes: VMT=vehicle miles traveled; kWh=kilowatt hour
To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. In addition, the project site is served by numerous regional freeway systems (e.g., State Routes 99, 58, and 178) that provide the most direct routes from various areas of the region. Moreover, all construction equipment would cease operating upon completion of project construction. Thus, energy use during construction of the proposed project would not be considered inefficient, wasteful, or unnecessary.

Long-Term Impacts During Operation
Operation of the proposed project would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use. Operational energy use would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems, use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting.

I I I

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 78 ends

Electrical Energy
Operation of the proposed project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the proposed project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. As shown in Table 23, Project Grid Electricity Demand, the proposed project would have a total electricity demand of 5,968,579 kilowatt hours per year (kWh/yr).

Table 23 Project Electricity Demand
Land Use Electricity (kWh/year)1,2
Regional Shopping Center3 2,335,726
Medical Office 214,042
Convenience Mart/Gas Station 25,106
Fast Food Restaurant w/Drive Thru 753,849
Automated Carwash 48,643
Public Storage 429,593
Parking Lot 959,688
Renewable Electricity from Onsite PV Systems1 1,201,933 Proposed Project Total 5,968,579
Source: CalEEMod version 2022.1.
1 Based on information provided by the project applicant. 2 Accounts for total electricity use from proposed buildings and parking lots. See Appendix A. 3 The shown electricity demand represents the CalEEMod default electricity demand of 3,537,659 kWh per year minus the anticipated 1,201,933 kWh per year of renewable electricity that would be generated from the proposed onsite PV systems.

While the proposed project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the proposed project would install rooftop PV systems and battery storage systems. These systems would contribute an estimated 1,201,933 kWh/yr of onsite renewable electricity to offset a portion of the project electricity demand from the grid. The on-site PV systems and battery storage—in addition to compliance with the RPS requirements by PG&E to increase electricity from renewable sources in the coming years—would further increase renewable electricity use. Furthermore, compliance with CALGreen would contribute to reducing indoor water use, which would also contribute to minimizing electricity demand from the transport and distribution of water. Thus, electricity use from operation of the proposed project would not be considered inefficient, wasteful, or unnecessary.

Natural Gas Energy
The proposed project would generate demand for natural gas due to the heating and cooling for the building and for water. As shown in Table 24, Project Natural Gas Demand, the proposed land uses would generate a natural gas demand of 6,150,142 kilo British thermal units per year (kBTU/yr) under full buildout conditions.

Development pursuant to the proposed project would result in a net increase in natural gas demands. However,

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 79
the proposed project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing energy efficiency of the proposed buildings. For example, building insulation requirements would contribute to minimizing use of natural gas for heating. Thus, overall, the proposed project would not result in wasteful or unnecessary natural gas demands.

Table 24 Project Natural Gas Demand
Land Use Natural Gas (kBTU/year)1,2
Regional Shopping Center 3,280,464
Medical Office 364,604
Convenience Mart/Gas Station 14,278
Fast Food Restaurant w/Drive Thru 2,109,444
Automated Carwash 167,987
Public Storage 213,366
Parking Lot 0
Proposed Project Total 6,150,142
Source: CalEEMod version 2022.1.

Note: kBTU = kilo British thermal units
1 Based on information provided by the project applicant. 2 Accounts for total natural gas use from proposed buildings. See Appendix A.

Transportation Energy
The proposed project would consume long-term transportation-related energy during operations from the use of motor vehicles. Estimates of transportation energy use are based on the overall VMT and EMFAC2021 fuel consumption data. Project-related vehicle trips would primarily be generated from customers and employees.

Additional vehicle trips to the project site would include deliveries, waste pick up, and maintenance trips.

Table 25, Project Annual Operation-Related Fuel Usage, shows the annual energy usage from project-related vehicle trips at full buildout. While operation of the proposed project would result in energy usage, the project site is within a half mile of bus stops for three Golden Empire Ticket bus routes (Routes 61, 82, and 84) and would be accessible from the existing surrounding sidewalks and class II bike lanes along Rosedale Highway and Coffee Road (IEG 2026). The proposed project would also provide bicycle parking and lockers. These amenities could contribute to minimizing vehicle trips and VMT. In addition, fuel efficiency standards for automobiles are established nationwide under the CAFE standards, which are not directly applicable to residents or land use development projects, but to car manufacturers. Thus, future customers and employees of the proposed project and the general population in the region do not have direct control in determining the fuel efficiency of vehicles manufactured and that are made available. However, compliance with the CAFE standards by car manufacturers would ensure that vehicles produced in future years have greater fuel efficiency and would generally result in an overall benefit of reducing fuel usage by providing the population of the city and region more fuel-efficient vehicle options. Thus, the assumed and forecast general fuel efficiency based on EMFAC2021 data used to quantify project-related transportation energy usage in Table 25 also applies to the population at large, and vehicles driven by project customers and employees would not be any less efficient than the vehicles driven by

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 80 ends

the general population. Thus, it is expected that operation-related fuel usage associated with the proposed project would not be considered inefficient, wasteful, or unnecessary.

Table 25 Project Annual Operation-Related Fuel Usage
Source
Gasoline Diesel CNG Electricity
Annual VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
kWh
Project Vehicle Trips 32,807,847 1,328,437 2,787,487 251,080 10,571 313 1,856,622 646,405 Source: EMFAC2021 v. 1.0.2.
1 Based on VMT and trip generation data provided by Integrated Engineering Group (2026).

ENE-2 Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency. [Threshold E-2])
The following evaluates consistency of the proposed project with California’s RPS program.

California Renewables Portfolio Standard
The statewide RPS goal is not directly applicable to individual development projects, but to utilities and energy providers such as PG&E, which would provide all of the electricity needs for the proposed project. Compliance of PG&E in meeting the RPS goals would ensure that the State meets its objective of transitioning to renewable energy. The proposed project would be subject to the 2025 Building Energy Efficiency Standards and, in compliance with those standards, would install battery storage and rooftop PV systems. These systems would support the RPS program and the statewide transition to renewable energy. Therefore, implementation of the proposed project would not conflict with or obstruct plans for renewable energy and energy efficiency.

5.3 RECOMMENDED REDUCTION MEASURES

5.3.1 Air Quality
Impact AIR-1 and Impact AIR-2
Operation
AQ-1 Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, completion of the VERA.

AQ-2 The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 81
including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.

5.3.2 Greenhouse Gas Emissions
Impact GHG-1
GHG-1 The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable.

The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.

GHG-2 Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as the Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity.

If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime, but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.

GHG-3 All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.

GHG-4 Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 82 ends

Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.

GHG-5 The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordinate with Golden Empire Transit has been initiated.

GHG-6 The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.

GHG-7 The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.

Impact GHG-2
Apply Reduction Measures GHG-5 and GHG-6.

Measure Considered and Rejected
A measure to require tenants/business operators to only use zero-emission medium-heavy duty and heavy-heavy duty vendor trucks was considered. However, this type of measure was rejected due to the retail commercial nature of the proposed project. It is anticipated that the tenants/business operators would not own their own truck fleets and thus, the types of goods delivery/vendor trucks received by the tenants/business operators would be dependent on third-party truck fleet operators. Therefore, the types of trucks delivering goods to the tenants/business operators would not be in their control.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 83

5.3.3 Energy
No reduction measures necessary.

5.4 RESULTS WITH REDUCTION MEASURES

5.4.1 Air Quality
Impact AIR-1 and Impact AIR-2
Implementation of Reduction Measure AQ-2 would provide onsite reductions in VOC emissions associated with coatings and paints used for the building exterior surfaces and parking lot striping. Furthermore, implementation of Reduction Measures GHG-1 through GHG-3 could also provide VOC reductions generated from building energy use, property management landscaping equipment, and project-related vehicle trips. Table 26, Annual Regional Operation Emissions With Reduction Measures AQ-2 and GHG-3, shows the project-related annual emissions at full buildout with incorporation of Reduction Measure AQ-2 (low VOC content paints) and Reduction Measure GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annual emissions at full buildout without the reduction measures.

Table 26 Annual Regional Operation Emissions With Reduction Measures AQ-2 and GHG-3 Source
Maximum Daily Emissions (tons per year)
VOC NOx CO SO2 PM10 PM2.5
Full Buildout (2027 Full Buildout Year) Without Mitigation Mobile1,2 13 10 68 <1 13 3
Area 1.98 0.01 1.59 9.47E-5 2.81E-3 2.13E-3
Energy <1 <1 <1 <1 <1 <1
Total 14.56 10.29 70.26 0.16 13.32 3.50
Full Buildout (2027 Full Buildout Year) With Mitigation Mobile1,2 13 10 68 <1 13 3
Area3 1.69 0 0 0 0 0
Energy <1 <1 <1 <1 <1 <1
Total 14.27 10.28 68.67 0.16 13.32 3.50
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Net Change
Mobile 0 0 0 0 0 0
Area (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Energy 0 0 0 0 0 0
Total (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Source: CalEEMod Version 2022.1.

Notes: (“ “) = negative value
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of Reduction Measure AQ-2, which requires use of paints and coatings with a VOC content of 25 grams per liter or less, and Reduction Measure GHG-3, which requires all landscaping equipment to be electric-powered.

I I I I

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 84 ends

As shown in Table 26, the proposed project would still exceed the SJVAPCD significance thresholds for VOC and NOX with incorporation of Reduction Measures AQ-2 and GHG-3. However, the amount exceeded for these two criteria air pollutants would be addressed through implementation of Reduction Measure AQ-1, which would require a VERA for the proposed project. In general, a VERA provides pound-for-pound mitigation of air pollutant emissions through a process that funds and implements emission reduction projects through the SJVAPCD emission reduction incentive grant program. Thus, implementation of Reduction Measure AQ-1—in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510—would, at minimum, offset the amount of project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Implementation of Reduction Measure AQ-1 would also ensure consistency of the proposed project with the applicable SJVAPCD air quality plans and ensure that operation of the proposed project would not cumulatively contribute to the nonattainment designations of the SJVAB.

5.4.2 Greenhouse Gas
Impact GHG-1
Table 27, Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3, shows the project-related annual emissions at full buildout with incorporation of Reduction Measure GHG-1 (all-electric building systems and appliances) and Reduction Measure GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annuals emissions at full buildout without the reduction measures. Implementation of Reduction Measures GHG-1 and GHG-3 would contribute to supporting and encouraging use of electricity instead of natural gas or other liquid fuels, which would minimize on-site generation of GHG emissions. As shown in Table 27, implementation of Reduction Measures GHG-1 and GHG-3 would reduce project-related GHG emissions by 102 MTCO2e/yr. However, these two reduction measures would not reduce project-related emissions to achieve net zero. Overall, the other reduction measures would help contribute to reducing operation-related project GHG emissions to the extent feasible. For example, Reduction Measure GHG-2 would contribute to increasing use of carbon-free renewable electricity and supplement the on-site renewable electricity generated by the proposed on-site PV systems. Additionally, Reduction Measures GHG-5 and GHG-6 would result in active and public transit facility improvements and encourage active transit and public transit use, which would contribute to reducing passenger VMT.

Furthermore, Reduction Measure GHG-7 would result in increased EV charging infrastructure improvements and support use and adoption of EVs. Overall, although implementation of reduction measures would reduce project-related GHG emissions to the extent feasible, operation of the proposed project is still anticipated to generate GHG emissions and would not achieve the net zero threshold. Thus, project-related GHG emissions would have a substantial cumulative contribution to GHG emissions impacts.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 85
Table 27 Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3 Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Full Buildout (2027 Opening Year) Without Mitigation
Mobile1,2 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Full Buildout (2027 Opening Year) With Mitigation
Mobile1,2 14,894 93%
Area3 0 0%
Energy4 677 4%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 15,926 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Net Change
Mobile 0 N/A
Area (6) N/A
Energy (96) N/A
Water 0 N/A
Solid Waste 0 N/A
Refrigerants 0 N/A
Amortized Construction (30-years) 0 N/A
Total All Sectors (102) N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of Reduction Measure GHG-3, which requires all landscaping equipment to be electric-powered. 4 Includes implementation of Reduction Measure GHG-1, which requires all-electric building systems and appliances for land uses except for restaurant land uses.

Impact GHG-2
Per the VMT analysis prepared, the proposed project has been designed to incorporate feasible VMT reducing strategies (GTS 2025). The proposed project would include end-of-trip bicycle facilities such as bicycle parking and lockers. In addition, it also includes bicycle facility improvements as it proposes a new bicycle lane along Rosedale Drive, which would extend an existing facility and improve overall bicycle network connectivity.

Furthermore, the proposed project includes pedestrian network improvements such as new sidewalks along its

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 86 ends

frontages, which would improve pedestrian connectivity and walkability (GTS 2025). Aside from these project-related design features, future commercial tenants of the proposed project would be subject to the SJVAPCD Rule 9410 eTRIP rule. These project improvements in addition to the SJVPACD eTRIP rule would contribute to reducing project-generated VMT to the extent feasible. Incorporation of Reduction Measures GHG-5 and GHG-6, which would result in improvements for up to two bus stops and installation of an onsite end-of-trip shower facility, would also contribute to reducing project-generated VMT to the extent feasible by supporting public transit and bicycle use. However, overall, the proposed project would continue to be inconsistent with the Kern COG 2022 RTP/SCS.

5.5 CUMULATIVE IMPACTS

5.5.1 Air Quality
In accordance with SJVAPCD’s methodology, any project that produces a significant project-level regional air quality impact in an area that is in nonattainment contributes to the cumulative impact. The greatest source of emissions in the SJVAB is mobile sources. Due to the extent of the area potentially impacted from cumulative emissions (i.e., the SJVAB), SJVAPCD considers a project cumulatively significant when project-related emissions exceed the SJVAPCD regional emissions thresholds shown in Table 9.

Construction
The SJVAB is designated nonattainment for O3 and PM2.5 under the California and National AAQS, and nonattainment for PM10 under the California AAQS. Construction of cumulative projects will further degrade the regional and local air quality. Air quality will be temporarily impacted during construction activities.

However, construction emissions associated with the proposed project would not exceed the SJVAPCD’s regional construction emissions thresholds. Therefore, the project’s contribution to cumulative air quality impacts would be less than cumulatively considerable.

Operation
For operational air quality emissions, any project that does not exceed or can be mitigated to less than the daily regional threshold values is not considered by the SJVAPCD to be a substantial source of air pollution and does not add significantly to a cumulative impact. Incorporation of Reduction Measure AQ-1, which would require the project applicant to enter into a VERA with the SJVAPCD, would, at minimum, offset the amount of project-operation-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Furthermore, with implementation of reduction measures, the proposed project would be consistent with regional plans to reduce air pollution. Therefore, the project’s operational phase air pollutant emissions would not be cumulatively considerable.

5.5.2 Greenhouse Gas Emissions
Project-related GHG emissions are not confined to a particular air basin, but are dispersed worldwide.

Therefore, impacts identified under Impact GHG-1 are not project-specific impacts to global warming, but the proposed project’s contribution to this cumulative impact. As stated, implementation of Reduction Measures

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts
May 2026 Page 87
GHG-1 through GHG-7 would contribute to minimizing project-related energy sector and mobile source GHG emissions to the extent feasible. However, the proposed project would still result in a net increase in GHG emissions. Thus, the proposed project’s GHG emissions and contribution to global climate change impacts are considered cumulatively considerable.

5.5.3 Energy
The area considered for cumulative impacts to electricity and natural gas supplies is the service area of PG&E.

Other projects in the PG&E service area would be required to comply with the Building Energy Efficiency Standards and CALGreen, which would contribute to minimizing wasteful energy consumption and promoting renewable energy sources. As discussed in impact discussion ENE-1, construction- and operation-related energy impacts caused by the proposed project would not be considered inefficient, wasteful, or unnecessary.

The proposed project would therefore not contribute to any cumulative energy impacts when considered together with cumulative development projects and would not be cumulatively considerable.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSION S, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

5. Environmental Impacts

Page 88 ends

This page intentionally left blank.

May 2026 Page 89

6. References
Bay Area Air Quality Management District (BAAQMD). 2023, April. 2022 California Environmental Quality Act Air Quality Guidelines. https://www.baaqmd.gov/plans-and-climate/california-environmental -quality-act-ceqa/updated-ceqa-guidelines.

California Air Resources Board (CARB). 1998, April 22. The Report on Diesel Exhaust. http://www.arb.ca.gov/toxics/dieseltac/de-fnds.htm.
———. 1999. Final Staff Report: Update to the Toxic Air Contaminant List. ———. 2004, July 22. 2004 Revision to the California State Implementation Plan for Carbon Monoxide.

Updated Maintenance Plan for Ten Federal Planning Areas. https://ww3.arb.ca.gov/planning/sip/co/final_2004_co_plan_update.pdf. ———. 2005, April. Air Quality and Land Use Handbook: A Community Health Perspective. https://www.aqmd.gov/docs/default-source/ceqa/handbook/california-air-resources-board-air-quality-and-land-use-handbook-a-community-health-perspective.pdf. ———. 2017a, January 18. California’s Advanced Clean Cars Midterm Review. https://ww2.arb.ca.gov/sites/default/files/2020-01/ACC%20MTR%20Summary_Ac.pdf. ———. 2017b, March. Short-Lived Climate Pollutant Reduction Strategy. https://www.arb.ca.gov/cc/shortlived/shortlived.htm.
———. 2018, February. Proposed Update to the SB 375 Greenhouse Gas Emission Reduction Targets. https://ww2.arb.ca.gov/sites/default/files/2020-06/SB375_Updated_Final _Target_Staff_Report_2018.pdf.
———. 2022, November 16. 2022 Scoping Plan for Achieving Carbon Neutrality. https://ww2.arb.ca.gov/sites/default/files/2022-12/2022-sp.pdf. ––––––. 2024a, July 16. Ambient Air Quality Standards. https://ww2.arb.ca.gov/sites/default/files/2024- 08/AAQS%20Table_ADA_FINAL_07222024.pdf.
———. 2025a, November 13 (accessed). SB 375 Regional Targets. https://ww2.arb.ca.gov/our-work/programs/sustainable-communities-program/sb-375-regional-targets. ———. 2025b, November 4. California Greenhouse Gas Emissions from 2000-2023: Trends of Emissions and Other Indicators Report. https://ww2.arb.ca.gov/sites/default/files/ 2025-11/nc-2000_2023_ghg_inventory_trends.pdf.
———. 2026a, February 10 (Accessed). Maps of State and Federal Area Designations. https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations. ———. 2026b, February 7 (accessed). Common Air Pollutants. https://ww2.arb.ca.gov/resources/common -air-pollutants.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

6. References

Page 90 ends

———. 2026c, February 10 (accessed). Air Pollution Data Monitoring Cards (2020, 2021, 2022, 2023, and 2024). http://www.arb.ca.gov/adam/topfour/topfour1.php.

California Climate Action Team (CAT). 2006, March. Climate Action Team Report to Governor Schwarzenegger and the Legislature.

California Climate Change Center (CCCC). 2012, July. Our Changing Climate 2012: Vulnerability and Adaptation to the Increasing Risks from Climate Change in California.

California Energy Commission (CEC). 2006. Our Changing Climate: Assessing the Risks to California. 2006 Biennial Report. CEC-500-2006-077. California Climate Change Center. ———. 2009, May. The Future Is Now: An Update on Climate Change Science, Impacts, and Response Options for California. CEC-500-2008-0077.
———. 2021, May 19. Amendments to the Building Energy Efficiency Standards (2022 Energy Code) Draft Environmental Report. CEC-400-2021-077-D.
———. 2026a, February 9 (accessed). Electricity Consumption. . https://www.energy.ca.gov/data-reports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-0. ———. 2026b, February 9 (accessed). Natural Gas Consumption. https://www.energy.ca.gov/data-reports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-1. ––––––. 2026c, February 11 (accessed). Annual Oil Supply Sources to California Refineries. https://www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/annual-oil-supply-sources-california. ––––––. 2025d, February 11 (accessed). Foreign Sources of Crude Oil Imports to California. Accessed https://www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/foreign-sources-crude-oil-imports. ––––––. 2026e, February 11 (accessed). 2024 California Annual Retail Fuel Outlet Report Results (CEC-A15). https://www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/california-retail-fuel-outlet-annual-reporting.

California Natural Resources Agency (CNRA). 2014, July. Safeguarding California: Reducing Climate Risk: An Update to the 2009 California Climate Adaptation Strategy.

California Office of Emergency Services (CalOES). 2020, June. California Adaptation Planning Guide. https://www.caloes.ca.gov/HazardMitigationSite/Documents/CA-Adaptation-Planning-Guide-FINAL-June-2020-Accessible.pdf.

California Public Utilities Commission (CPUC). 2021, May. 2021 Padilla Report: Costs and Savings for the RPS Program (Public Utilities Code Section 913.3). https://www.cpuc.ca.gov/-/media/cpuc -website/industries-and-topics/documents/energy/rps/2021-padilla-report_final.pdf.

General Technologies and Solutions (GTS). 2025, December 22. Vehicle Miles Traveled (VMT) Analysis Riverview Market Commercial Development, City of Bakersfield, CA.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

6. References
May 2026 Page 91
Governor’s Office of Land Use and Climate Innovation (LCI). 2008, June. CEQA and Climate Change:

Addressing Climate Change through CEQA Review. Technical Advisory. https://opr.ca.gov/docs/june08-ceqa.pdf.

International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings.

Integrated Engineering Group (IEG). 2026, January. Riverview Market Transportation Analysis.

Intergovernmental Panel on Climate Change (IPCC). 2001. Third Assessment Report: Climate Change 2001.

New York: Cambridge University Press.
———. 2007. Fourth Assessment Report: Climate Change 2007. New York: Cambridge University Press. ———. 2013. Fifth Assessment Report: Climate Change 2013. New York: Cambridge University Press. ––––––. 2023. Sixth Assessment Report: Climate Change 2022. New York: Cambridge University Press. https://www.ipcc.ch/assessment-report/ar6/.

Kern Council of Governments (Kern COG). 2022. 2022 Regional Transportation Plan/Sustainable Communities Strategy. https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf.

National Highway Traffic Safety Administration (NHTSA). 2022, April 1. USDOT Announces New Vehicle Fuel Economy Standards for Model year 2024-2026. https://www.nhtsa.gov/press-releases/usdot -announces-new-vehicle-fuel-economy-standards-model-year-2024-2026. ———. 2024, June 7. Corporate Average Fuel Economy, NHTSA Announces New Proposal for CAFE and HDPUV Standards. https://www.nhtsa.gov/laws-regulations/corporate-average-fuel-economy. ––––––. 2025a, June 11. Resetting the Corporate Average Fuel Economy Program [Docket No. NHTSA-2025-0055]. https://www.federalregister.gov/documents/2025/06/11/2025-10586/resetting-the-corporate-average-fuel-economy-program. ———. 2025b, December 3. President Trump & Transportation Secretary Sean P. Duffy Unveil New “Freedom Means Affordable Cars” Initiative to Reset Fuel Economy Standards https://www.transportation.gov/briefing-room/president-trump-transportation-secretary-sean-p-duffy-unveil-new-freedom-means.

Office of Environmental Health Hazard Assessment (OEHHA). 2015, February. Air Toxics Hot Spots Program Risk Assessment Guidelines: Guidance Manual for Preparation of Health Risk Assessments. http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf. ———. 2018, May. Indicators of Climate Change in California. https://oehha.ca.gov/media/ downloads/climate-change/report/2018caindicatorsreportmay2018.pdf.

Pacific Gas and Electric Company (PG&E). 2026a, February 10 (accessed). Company profile. https://www.pge.com/en_US/about-pge/company-information/profile/profile.page. ———. 2026b, February 11 (accessed). 2024 Power Content Label: Pacific Gas and Electric Company. https://www.pge.com/assets/pge/docs/about/corporate-responsibility-and-sustainability/2024-pcl-pacific-gas-and-electric-company.pdf.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

6. References

Page 92 ends

PlaceWorks. 2026, March. Water Supply and Demand Analysis Coffee and Rosedale Commercial Retail Development Project.

San Joaquin Valley Air Pollution Control District (SJVAPCD). 2007a, April 30. 2007 Ozone Plan. ———. 2007b, September 20. 2007 PM10 Maintenance Plan and Request for Redesignation. https://www.valleyair.org/media/xmxlzxff/pm10maintenanceplan209-07.pdf. ———. 2008 PM2.5 Plan. https://www.valleyair.org/rules-and-planning/air-quality-plans/particulate-matter-plans/2008-pm25-plan/. ———. 2009a, April 16. 2009 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP).
https://www.valleyair.org/media/npmhpexf/ractsip-2009.pdf. ———. 2009b, December 17. Guidance for Valley Land-Use Agencies in Addressing GHG Emissions for New Projects. https://www.valleyair.org/media/dnsnicdv/3-ccap-final-lu-guidance-dec-17-2009.pdf. ———. 2009c, December 17. Climate Change Action Plan, Final Staff Report, Addressing Greenhouse Gas Emissions Impacts under the California Environmental Quality Act. https://ww2.valleyair.org/media/mdfm0lsd/1-ccap-final-ceqa-ghg-staff-report-dec-17-2009.pdf. ———. 2012, December 20. 2012 PM2.5 Plan.
https://www.valleyair.org/media/b2jho5kt/completedplanbookmarked.pdf. ———. 2013. September 19. 2013 Plan for the Revoked 1-Hour Ozone Standard. https://ww2.valleyair.org/media/uwqfm4yq/adoptedplan.pdf . ———. 2014, June 19. 2014 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP). https://www.valleyair.org/media/42znjsez/2014- ract-sip.pdf.
———. 2015a, April 16. 2015 Plan for the 1997 PM2.5 Standard. https://www.valleyair.org/media/ipxjiz3r/2015-pm25-plan_bookmarked.pdf. ———. 2015b, March 19. Guidance for Assessing and Mitigating Air Quality Impacts. https://www.valleyair.org/media/g4nl3p0g/gamaqi.pdf.
———. 2016a, June 16. 2016 Ozone Plan for 2008 8-Hour Ozone Standard. https://www.valleyair.org/media/ed2f1tdd/adopted-plan.pdf . ———. 2016b, September 15. 2016 Moderate Area Plan for the 2012 PM2.5 Standard. https://www.valleyair.org/media/ascouxxn/2016-plan.pdf. ———. 2018. November 15. 2018 Plan for the 1997, 2006, and 2013 PM 2.5 Standards. https://archive.valleyair.org/pmplans/documents/2018/pm-plan-adopted/2018-Plan-for-the-1997- 2006-and-2012-PM2.5-Standards.pdf.
———. 2024, May 6 (revised). San Joaquin Valley Air Pollution Control District: District Policy APR 1925 – Policy for District Rule 2201 AAQA Modeling. https://www.valleyair.org/media/341fy4sn/apr-1925-rule-2201-aaqa-modeling-may-2024.pdf.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

6. References
May 2026 Page 93
———. 2026a. February 5, 2026 (Accessed). Air Quality Attainment Plans. http://valleyair.org/Air_Quality_Plans/air-quality-plans.htm. ———. 2026b. February 9, 2023 (Accessed). Frequently Asked Questions. https://www.valleyair.org/about/frequently-asked-questions/. ———. 2026c, February 10 (Accessed). Ambient Air Quality Standards & Valley Attainment Status. https://www.valleyair.org/aqinfo/attainment.htm.

South Coast Air Quality Management District (South Coast AQMD). 1992. Federal Attainment Plan for Carbon Monoxide.
———. 2003. Final 2003 Air Quality Management Plan. https://www.aqmd.gov/home/air-quality/clean-air -plans/air-quality-mgt-plan/2003-aqmp.
———. 2005, May. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. http://www.aqmd.gov/docs/default-source/planning/air-quality-guidance/complete-guidance -document.pdf.
———. 2013, February. 2012 Final Air Quality Management Plan. https://www.aqmd.gov/home/air-quality/air-quality-management-plans/air-quality-mgt-plan/final-2012-air-quality-management-plan .

U.S. Energy Information Administration (EIA). 2026, February 10 (accessed). Petroleum & Other Liquids, Crude Oil Production. https://www.eia.gov/dnav/pet/pet_crd_crpdn_adc_mbbl_a.htm.

U.S. Environmental Protection Agency (USEPA). 2002, May. Health Assessment Document for Diesel Engine Exhaust. Prepared by the National Center for Environmental Assessment, Washington, DC, for the Office of Transportation and Air Quality. EPA/600/8-90/057F. ———. 2009, December. EPA: Greenhouse Gases Threaten Public Health and the Environment: Science overwhelmingly shows greenhouse gas concentrations at unprecedented levels due to human activity. https://archive.epa.gov/epapages/newsroom_archive/newsreleases/08d11a451131bca58525768500 5bf252.html.
———. 2025a, February 27 (updated). USEPA: Endangerment and Cause or Contribute Findings for Greenhouse Gases Under Section 202(a) of the Clean Air Act. https://www.epa.gov/climate-change/ endangerment-and-cause-or-contribute-findings-greenhouse-gases-under-section-202a. ———. 2025b, March 12. Final Rule: Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles. https://www.epa.gov/regulations-emissions-vehicles-and-engines/final-rule-multi-pollutant-emissions-standards-model#:~:text=On%20March%2020%2C%202024%2C%20EPA,starting%20with%20model%20ye ar%202027.
———. 2025c, May 28 (updated). Summary of the Energy Independence and Security Act. Accessed November 20, 2025. https://www.epa.gov/
laws-regulations/summary-energy-independence-and-security-act. ———. 2025d, July 29. EPA Releases Proposal to Rescind Obama-Era Endangerment Finding, Regulations that Paved the Way for Electric Vehicle Mandates news release. Accessed July 29, 2025.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS, AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION

6. References

Page 94 ends

https://www.epa.gov/newsreleases/epa-releases-proposal-rescind-obama-era-endangerment-finding-regulations-paved-way. ———. 2026a, February 10 (accessed). Criteria Air Pollutants. https://www.epa.gov/criteria-air-pollutants. ———. 2026b, February 10 (accessed). Health and Environmental Effects of Hazardous Air Pollutants. https://www.epa.gov/haps/health-and-environmental-effects-hazardous-air-pollutants.

White House. 2025, January 20. Unleashing American Energy. https://www.whitehouse.gov/presidential-actions/2025/01/unleashing-american-energy/.

Western Regional Climate Center (WRCC). 2026, February 10 (accessed). Period of Record Monthly Climate Summary, 10/01/1937 to 06/09/2016. Bakersfield AP, California (Station ID # 040442). Western US Climate Summaries. https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca0442.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION Appendix
May 2026
Appendix A. Modeling Summaries and Assumptions

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION Appendix
PlaceWorks
This page intentionally left blank.

Regional Operational Emissions Worksheet
Regional Emission (Tons/Yr)
Phase 1 (Opening Year 2026)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 11.57152593 9.462525355 63.89544133 0.142622 11.91614987 3.11827332 Area 1.544984598 0.010396326 1.235189721 7.368E-05 0.002195269 0.00165864 Energy 0.01420645 0.25829908 0.21697123 0.0015498 0.019630729 0.01963073 Total 13.13071698 9.73122076 65.34760228 0.1442455 11.93797587 3.13956269 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? Yes No No No No No
Phase 2 (Opening Year 2027)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 1.44135406 1.144872842 7.848619087 0.018082 1.525549893 0.39877468 Area 0.439145898 0.002962694 0.352090131 2.1E-05 0.000625403 0.00047277 Energy 0.002374816 0.043178468 0.036269913 0.0002591 0.003281563 0.00328156 Total 1.882874775 1.191014003 8.236979131 0.0183621 1.529456859 0.40252901 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? No No No No No No
Full Buildout (Buildout Year 2027)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 12.56420059 9.979790832 68.41596196 0.1576198 13.29813083 3.47609596 Area 1.984211701 0.013356724 1.587329497 9.469E-05 0.002819505 0.00213141 Energy 0.016581265 0.301477547 0.253241144 0.0018089 0.022912292 0.02291229 Total 14.56499356 10.2946251 70.2565326 0.1595233 13.32386263 3.50113967 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? Yes Yes No No No No

0.295
Ambient Air Quality Analysis (lbs/day) 4217049747 2754.744725 4217052501 Annual Operational Days: 365
ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 25,128.401 19,959.582 136,831.924 315.240 26,596.262 6,952.192 Area 3,968.423 26.713 3,174.659 0.189 5.639 4.263
Energy 33.163 602.955 506.482 3.618 45.825 45.825
Total 29,129.987 20,589.250 140,513.065 319.047 26,647.725 7,002.279 Maximum Daily Emissions 79.81 56.41 384.97 0.87 73.01 19.18 SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceeds Thresholds? No No Yes No No No
Regional Operational Emissions Worksheet With Reduction Measures AQ-2 and GHG-3 Regional Emission (Tons/Yr)
Phase 1 (Opening Year 2026)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile1 11.57152593 9.462525355 63.89544133 0.142622 11.91614987 3.11827332 Area 1.319575806 0 0 0 0 0
Energy 0.01420645 0.25829908 0.21697123 0.0015498 0.019630729 0.01963073 Total 12.90530819 9.720824435 64.11241256 0.1441718 11.9357806 3.13790405 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? Yes No No No No No 1 Based on calendar year 2023 emissions.

Phase 2 (Opening Year 2027)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile2 1.44135406 1.144872842 7.848619087 0.018082 1.525549893 0.39877468 Area 0.375336513 0 0 0 0 0
Energy 0.002374816 0.043178468 0.036269913 0.0002591 0.003281563 0.00328156 Total 1.819065389 1.18805131 7.884889 0.0183411 1.528831457 0.40205624 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? No No No No No No 2 Based on calendar year 2023 emissions.

Full Buildout (Buildout Year 2027)
Annual ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 12.56420059 9.979790832 68.41596196 0.1576198 13.29813083 3.47609596 Area 1.69491244 0 0 0 0 0
Energy 0.016581265 0.301477547 0.253241144 0.0018089 0.022912292 0.02291229 Total 14.2756943 10.28126838 68.6692031 0.1594286 13.32104312 3.49900825 Regional Thresholds 10 10 100 27 15 15
Exceeds Thresholds? Yes Yes No No No No
$ 422,438.60 $ (28,582.77)
Ambient Air Quality Analysis (lbs/day) 3949800876 -267248871 3682552005 Annual Operational Days: 365
ROG NOx CO SO2 PM10 Total PM2.5 Total
Mobile 25,128.401 19,959.582 136,831.924 315.240 26,596.262 6,952.192 Area 3,389.825 0 0 0 0 0
Energy 33.163 602.955 506.482 3.618 45.825 45.825
Total 28,551.389 20,562.537 137,338.406 318.857 26,642.086 6,998.017 Maximum Daily Emissions 78.22 56.34 376.27 0.87 72.99 19.17 SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceeds Thresholds? No No Yes No No No
GHG Emissions Worksheet
Construction Emissions
Emissions (MTCO2e)
Year Phase 1 Phase 2
Offsite
Improvement - Left
Turn Lane
Offsite
Improvement -
Traffic Signal Total
2026 344.2909967 0 14.30074393 4.683223969 363.27
2027 0 170.3985711 0 0 170.40
Total 344.29 170.40 14.30 4.68 533.67
Emissions
Phase (MTCO2e)
Phase 1 & Offsite Improvement 363
Phase 2 170
Total 534
Operation Emissions
Phase 1
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 13,481 93%
Area 5 0%
Energy 644 4%
Water 75 1%
Waste 194 1%
Refrig. 19 0%
Amortized Consstruction (30-years)2,3 12 0%
Total All Sectors 14,431 100%
Net Zero Threshold 0
Exceed Threshold? Yes
Phase 2
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 1,709 90%
Area 1 0%
Energy 128 7%
Water 19 1%
Waste 29 2%
Refrig. 0 0%
Amortized Consstruction (30-years)2 6 0%
Total All Sectors 1,892 100%
Net Zero Threshold 0
Exceed Threshold? Yes
1,892.3 56770.3126
Full Buildout
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 14,894 93%
Area 6 0%
Energy 773 5%
Water 94 1%
Waste 223 1%
Refrig. 19 0%
Amortized Consstruction (30-years)2 18 0%
Total All Sectors 16,027 100%
Net Zero Threshold 0
Exceed Threshold? Yes
16,027.3 480818.7064 1 Based on calendar year 2027 emission rates. 1 Based on calendar year 2026 emission rates.
1 Based on calendar year 2027 emission rates.
3 Includes construction emissions generated from the proposed left turn lane and traffic signal installations. 2 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. 2 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. 2 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings.

GHG Emissions Worksheet - With Reduction Measures AQ-2, GHG-1, and GHG-3 Construction Emissions
Emissions (MTCO2e)
Year Phase 1 Phase 2
Offsite
Improvement - Left
Turn Lane
Offsite
Improvement -
Traffic Signal Total
2026 344.2909967 0 14.30074393 4.683223969 363.27
2027 0 170.3985711 0 0 170.40
Total 344.29 170.40 14.30 4.68 533.67
Emissions
Phase (MTCO2e)
Phase 1 & Offsite Improvement 363
Phase 2 170
Total 534
Operation Emissions
Phase 1
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 13,481 94%
Area2 0 0%
Energy3 569 4%
Water 75 1%
Waste 194 1%
Refrig. 19 0%
Amortized Consstruction (30-years)4,5 12 0%
Total All Sectors 14,351 100%
Net Zero Threshold 0
Exceed Threshold? Yes
Phase 2
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 1,709 91%
Area2 0 0%
Energy3 108 6%
Water 19 1%
Waste 29 2%
Refrig. 0 0%
Amortized Consstruction (30-years)4 6 0%
Total All Sectors 1,871 100%
Net Zero Threshold 0
Exceed Threshold? Yes
1,870.6 56118.66056
Full Buildout
Source Buildout MTCO2e/Year Percent of Project Total
Mobile1 14,894 94%
Area2 0 0%
Energy3 677 4%
Water 94 1%
Waste 223 1%
Refrig. 19 0%
Amortized Consstruction (30-years)4 18 0%
Total All Sectors 15,926 100%
Net Zero Threshold 0
Exceed Threshold? Yes
15,925.6 477767.22
2 With incorporation of Reduction Measure GHG-3, which would permit use of electric-powered landscaping equipment for property maintenance. 3 With incorporation of Reduction Measure GHG-1, which requires all-electric building systems and appliances except for uses with commercial kitchens 2 With incorporation of Reduction Measure GHG-3, which would permit use of electric-powered landscaping equipment for property maintenance. 3 With incorporation of Reduction Measure GHG-1, which requires all-electric building systems and appliances except for uses with commercial kitchens 1 Based on calendar year 2026 emission rates.
4 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. 5 Includes construction emissions generated from the proposed left turn lane and traffic signal installations. 1 Based on calendar year 2027 emission rates.
4 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. 1 Based on calendar year 2027 emission rates.
4 Construction emissions are amortized over a 30 year project lifetime based on the service life of a building. For buildings in general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires the first major renovation. International Energy Agency (IEA), 2008, March. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. 2 With incorporation of Reduction Measure GHG-3, which would permit use of electric-powered landscaping equipment for property maintenance. 3 With incorporation of Reduction Measure GHG-1, which requires all-electric building systems and appliances except for uses with commercial kitchens Phase 1 Regional Construction Emissions Worksheet (Annual) - Unmitigated Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total Exhaust PM2.5 Fugitive PM2.5 PM2.5 Total Project Site
2026 1.07659345 0.83392311 1.43840814 0.00225708 0.0250701 0.17915888 0.204228981 0.023204133 0.039184877 0.06238901 Max Annual Emissions 1.0766 0.8339 1.4384 0.0023 0.0251 0.1792 0.2042 0.0232 0.0392 0.0624 Regional Thresholds 10 10 100 27 15 15
Exceed Thresholds? No No No No Yes Yes No Yes Yes No
Phase One Regional Construction Emissions Worksheet (Average Daily) - Unmitigated Phase 1 Construction Schedule
Construction Activity Start Date End Date Workdays
Site Preparation 03/16/2026 03/20/2026 5
Rough Grading 03/23/2026 04/03/2026 10
Building Construction 03/30/2026 12/28/2026 196
Utility Trenching 04/06/2026 06/05/2026 45
Fine Grading 06/08/2026 06/26/2026 15
Paving 06/29/2026 07/10/2026 10
Finishing and Landscaping 07/13/2026 10/09/2026 65
Architectural Coating 10/13/2026 12/28/2026 55
Construction Scenario Start Date End Date Workdays
Site Preparation 03/16/2026 03/20/2026 5
Rough Grading 03/23/2026 03/29/2026 5
Rough Grading & Building Construction 03/30/2026 04/03/2026 5 Building Construction 04/04/2026 04/05/2026 0
Building Construction & Utility Trenching 04/06/2026 06/05/2026 45 Building Construction 06/06/2026 06/07/2026 0
Building Construction & Fine Grading 06/08/2026 06/26/2026 15 Building Construction 06/27/2026 06/28/2026 0
Building Construction & Paving 06/29/2026 07/10/2026 10 Building Construction 07/11/2026 07/12/2026 0
Building Construction & Finishing and Landscaping 07/13/2026 10/09/2026 65 Building Construction 10/10/2026 10/12/2026 1
Architectural Coating 10/13/2026 12/28/2026 55
Total Work Days 206
Annual Emissions (Tons/Yr)
ROG NOx CO SO2 PM10 Total PM2.5 Total
2023 1.077 0.834 1.438 0.002 0.204 0.062
TOTAL 1.077 0.834 1.438 0.002 0.204 0.062
Ambient Air Quality Analysis (lbs/day)
ROG NOx CO SO2 PM10 Total PM2.5 Total
Total 10.45 8.10 13.97 0.02 1.98 0.61
SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceed Average Daily Thresholds? No No No No No No
Annual emissions divided by total construction duration to obtain average daily emissions.

Phase 2 Regional Construction Emissions Worksheet (Annual) - Unmitigated Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total Exhaust PM2.5 Fugitive PM2.5 PM2.5 Total Project Site
2027 0.34099244 0.45313128 0.85415728 0.00110931 0.01406337 0.10700077 0.121064136 0.012968389 0.021553771 0.03452216 Max Annual Emissions 0.3410 0.4531 0.8542 0.0011 0.0141 0.1070 0.1211 0.0130 0.0216 0.0345 Regional Thresholds 10 10 100 27 15 15
Exceed Thresholds? No No No No Yes Yes No Yes Yes No
Phase 2 Regional Construction Emissions Worksheet (Average Daily) - Unmitigated Phase 2 Construction Schedule
Construction Activity Start Date End Date Workdays
Site Preparation 01/04/2027 01/08/2027 5
Rough Grading 01/11/2027 01/22/2027 10
Building Construction 01/18/2027 07/23/2027 135
Utility Trenching 01/25/2027 02/19/2027 20
Fine Grading 02/22/2027 03/05/2027 10
Paving 03/08/2027 03/12/2027 5
Finishing and Landscaping 03/15/2027 04/30/2027 35
Architectural Coating 6/28/2027 07/23/2027 20
Construction Scenario Start Date End Date Workdays
Site Preparation 01/04/2027 01/08/2027 5
Rough Grading 01/11/2027 01/17/2027 5
Rough Grading & Building Construction 01/18/2027 01/22/2027 5 Building Construction 01/23/2027 01/24/2027 0
Building Construction & Utility Trenching 01/25/2027 02/19/2027 20 Building Construction 02/20/2027 02/21/2027 0
Building Construction & Fine Grading 02/22/2027 03/05/2027 10 Building Construction 03/06/2027 03/07/2027 0
Building Construction & Paving 03/08/2027 03/12/2027 5
Building Construction 03/13/2027 03/14/2027 0
Building Construction & Finishing and Landscaping 03/15/2027 04/30/2027 35 Building Construction 05/01/2027 06/27/2027 40
Building Construction & Architectural Coating 6/28/2027 07/23/2027 20 Total Work Days 145
Annual Emissions (Tons/Yr)
ROG NOx CO SO2 PM10 Total PM2.5 Total
2027 0.341 0.453 0.854 0.001 0.121 0.035
TOTAL 0.341 0.453 0.854 0.001 0.121 0.035
Ambient Air Quality Analysis (lbs/day)
ROG NOx CO SO2 PM10 Total PM2.5 Total
Total 4.7033 6.2501 11.7815 0.0153 1.6699 0.4762
SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceed Average Daily Thresholds? No No No No No No
Annual emissions divided by total construction duration to obtain average daily emissions.

Offsite Improvement (Left Turn Lane) Regional Construction Emissions Worksheet (Annual) - Unmitigated Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total Exhaust PM2.5 Fugitive PM2.5 PM2.5 Total Project Site
2026 0.00604402 0.04564274 0.0547713 0.00011966 0.00185327 0.00884903 0.010702299 0.00171367 0.001618331 0.003332002 Max Annual Emissions 0.0060 0.0456 0.0548 0.0001 0.0019 0.0088 0.0107 0.0017 0.0016 0.0033 Regional Thresholds 10 10 100 27 15 15
Exceed Thresholds? No No No No Yes Yes No Yes Yes No
Left Turn Lane Construction Schedule
Construction Activity Start Date End Date Workdays
Demolition 06/08/2026 06/12/2026 5
Site Preparation 06/15/2026 06/19/2026 5
Rough Grading 06/22/2026 07/03/2026 10
Fine Grading 08/03/2026 08/07/2026 5
Paving 08/10/2026 08/14/2026 5
Architectural Coating 08/17/2026 08/17/2026 1
Total Work Days 31
Annual Emissions (Tons/Yr)
ROG NOx CO SO2 PM10 Total PM2.5 Total
2024 0.006 0.046 0.055 0.000 0.011 0.003
TOTAL 0.006 0.046 0.055 0.000 0.011 0.003
Ambient Air Quality Analysis (lbs/day)
ROG NOx CO SO2 PM10 Total PM2.5 Total
Total 0.3899 2.9447 3.5336 0.0077 0.6905 0.2150
SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceed Average Daily Thresholds? No No No No No No
Annual emissions divided by total construction duration to obtain average daily emissions.

Offsite Improvement (Left Turn Lane) Regional Construction Emissions Worksheet (Average Daily) - Unmitigated Offsite Improvement (Traffic Signal) Regional Construction Emissions Worksheet (Annual) - Unmitigated Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total Exhaust PM2.5 Fugitive PM2.5 PM2.5 Total Project Site
2026 0.00133548 0.00871155 0.01754739 2.6538E-05 0.00026435 0.00228528 0.002549631 0.000244696 0.000550156 0.000794852 Max Annual Emissions 0.0013 0.0087 0.0175 0.0000 0.0003 0.0023 0.0025 0.0002 0.0006 0.0008 Regional Thresholds 10 10 100 27 15 15
Exceed Thresholds? No No No No Yes Yes No Yes Yes No
Traffic Signal Construction Schedule
Construction Activity Start Date End Date Workdays
Utility Trenching 07/06/2026 07/31/2026 20
Traffic Signal Installation 08/17/2026 09/11/2026 20
Total Work Days 40
Annual Emissions (Tons/Yr)
ROG NOx CO SO2 PM10 Total PM2.5 Total
2026 0.001 0.009 0.018 0.000 0.003 0.001
TOTAL 0.001 0.009 0.018 0.000 0.003 0.001
Ambient Air Quality Analysis (lbs/day)
ROG NOx CO SO2 PM10 Total PM2.5 Total
Total 0.0668 0.4356 0.8774 0.0013 0.1275 0.0397
SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 100 100 Exceed Average Daily Thresholds? No No No No No No
Annual emissions divided by total construction duration to obtain average daily emissions.

Offsite Improvement (Traffic Signal) Regional Construction Emissions Worksheet (Average Daily) - Unmitigated Full Buildout Regional Construction Emissions Worksheet (Annual) - Unmitigated Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total PM2.5 Total
Phase 1
Project Site
2026 1.07659345 0.83392311 1.43840814 0.00225708 0.0250701 0.17915888 0.20 0.06238901 0 0 0 0 0 0 0 0 0
Offsite Improvement (Left Turn Lane)
Project Site
2026 0.00604402 0.04564274 0.0547713 0.00011966 0.00185327 0.00884903 0.010702299 0.003332002 Offsite Improvement (Traffic Signal)
Project Site
2026 0.00133548 0.00871155 0.01754739 2.6538E-05 0.00026435 0.00228528 0.002549631 0.000794852 Phase 2
Project Site
2027 0.34099244 0.45313128 0.85415728 0.00110931 0.01406337 0.10700077 0.121064136 0.03452216 Combined Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total PM2.5 Total
2026 1.0840 0.8883 1.5107 0.0024 0.0272 0.1903 0.2175 0.0665 2027 0.3470 0.4988 0.9089 0.0012 0.0159 0.1158 0.1318 0.0379 Max Annual Emissions 1.08 0.89 1.51 0.00 0.03 0.19 0.22 0.07

1.387 2.420 0.004 0.043 0.306 0.349
Regional Thresholds 10 10 100 27 15 15
Exceed Thresholds? No No No No Yes Yes No No
Maximum Annual Emissions (lbs/yr)
ROG NOx CO SO2 Exhaust
PM10
Fugitive
PM10 PM10 Total PM2.5 Total
2026 2167.95 1776.55 3021.45 4.81 54.38 380.59 434.96 133.03 2027 694.07 997.55 1817.86 2.46 31.83 231.70 263.53 75.71 Max Annual Emissions 2167.95 1776.55 3021.45 4.81 54.38 380.59 434.96 133.03 Full Buildout Regional Construction Emissions Worksheet (Average Daily) - Unmitigated Number of Construction Days
2026 206
2027 145
Total Work Days 351
Annual Emissions (Tons/Yr)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total 2026 1.0840 0.8883 1.5107 0.0024 0.0272 0.1903 0.2175 0.0252 0.0414 0.0665 2027 0.3470 0.4988 0.9089 0.0012 0.0159 0.1158 0.1318 0.0147 0.0232 0.0379 TOTAL 1.43 1.39 2.42 0.00 0.04 0.31 0.35 0.04 0.06 0.10 Max Annual Emissions (Pounds/Yr) - Risk Prioritization Calculator Screening ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total 2026 2167.9459 1776.5548 3021.4536 4.8066 54.3754 380.5864 434.9618 50.3250 82.7067 133.0317 2027 694.0729 997.5480 1817.8572 2.4579 31.8333 231.6996 263.5329 29.3641 46.3442 75.7083 Max Annual Emissions (Pounds/Yr) 2167.95 1776.55 3021.45 4.81 54.38 380.59 434.96 50.32 82.71 133.03 Ambient Air Quality Analysis (lbs/day)
ROG NOx CO SO2
Fugitive
PM10
Exhaust
PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Total 8.1539 7.9034 13.7872 0.0207 0.2456 1.7444 1.9900 0.2270 0.3677 0.5947 SJVAPCD Ambient Air Quality Screening Thresholds 100 100 100 100 BMPs 82 100 BMPs 54 100 Exceed Average Daily Thresholds? No No No No No No No No No No Annual emissions divided by total construction duration to obtain average daily emissions.

CalEEMod Land Use Inputs: Operation
Name: Rosedale & Coffee
Project Location: Kern County
Land Use Setting: Urban
Builout Operational Year: 2027
General Info
Phase 1 Phase 2 Total
Project Site Area (Sq Ft): 1,609,641 401,089 2,010,730 square feet Disturbed Area (Sq Ft): 36.95 9.21 46.16
#REF! 0 46.16
New Building Info (please mark building square footage to assume) Phase 1 Phase 2 Total Parcel Number of
Building Square Feet (BSF) Acreage Fuel Pumps
Pad 1 Drive-Thru Restaurant 2,500 2,500
Pad 1 Fast Casual Restaurant 5,548 5,548
Pad 1 Electrical/Fire Riser 176 176
Pad 2 Car Wash PARCEL 03 4,100 4,100 1.79
Pad 3 Drive-Thru Restaurant 510 510
Pad 3 Electrical/Fire Riser 250 250
Pad 4 Drive-Thru Restaurant PARCEL 09 4,277 4,277 1.29
Pad 5 Drive-Thru Restaurant 2,296 2,296
Pad 5 Fast Casual Restaurant 4,226 4,226
Pad 5 Electrical/Fire Riser 176 176
Pad 6 Drive-Thru Restaurant 2,444 2,444
Pad 6 Electrical/Fire Riser 134 134
Pad 7 Retail 4,560 4,560
Pad 7 Electrical/Fire Riser 134 134
Pad 8 Retail 4,560 4,560
Pad 8 Electrical/Fire Riser 134 134
Pad 9 Restaurant 7,822 7,822
Pad 9 Electrical/Fire Riser 145 145
Pad 10 Suite A Retail 3,028 3,028
Pad 10 Suite B Restaurant 1,844 1,844
Pad 10 Suite C Retail 1,520 1,520
Pad 10 Suite D Restaurant 1,794 1,794
Pad 10 Drive-Thru Restaurant 1,720 1,720
Pad 10 Electrical/Fire Riser 204 204
Pad 11 Drive-Thru Restaurant 2,740 2,740
Pad 11 Retail 2,659 2,659
Pad 11 Retail 2,646 2,646
Pad 11 Retail 3,498 3,498
Pad 11 Electrical/Fire Riser 176 176
Pad 12 Medical Office 8,996 8,996
Pad 12 Electrical/Fire Riser 133 133
Pad 13 Restaurant 6,399 6,399
Pad 13 Electrical/Fire Riser 134 134
Pad 14 Restaurant 2,400 2,400
Pad 14 Retail 4,601 4,601
Pad 14 Electrical/Fire Riser 134 134
Shops 1 Suite A Retail 2,482 2,482
Shops 1 Suite B Retail 2,497 2,497
Shops 2 Suite A Retail 3,042 3,042
Shops 2 Suite B Retail 2,023 2,023
Shops 2 Suite C Retail 2,081 2,081
Shops 2 Suite D Fast Casual Restaurant 1,762 1,762
Shops 2 Suite E Retail 1,950 1,950
Major A Health Club PARCEL 08 24,993 24,993 2.60
Major B Market PARCEL 16 34,999 34,999 3.78
Major C Retail PARCEL 20 21,927 21,927 1.34
Major D Retail PARCEL 21 22,927 22,927 1.21
Major E Retail PARCEL 23 27,863 27,863 1.59
Major F Retail PARCEL 24 25,329 25,329 1.10
Major G Retail PARCEL 26 26,326 26,326 1.21
Major H Retail PARCEL 27 23,927 23,927 1.33
Major I Retail PARCEL 28 27,921 27,921 1.81
Major J Retail PARCEL 29 24,436 24,436 1.88
Storage Building PARCEL 01 40,000 40,000 1.68
Gas Station - Controller Office 308 308
Gas Station - Controller Storage 120 120
Gas Station Canopy n/a n/a 40
No Buildings PARCEL 05 n/a n/a 2.37
No Buildings PARCEL 06 n/a n/a 3.54
TOTAL 315,579 89,952 405,531 46.16 40
PARCEL 19
PARCEL 22
PARCEL 25
PARCEL 14

1.17 1.29

0.96 0.83

1.73 1.87

0.58 0.75

1.21 1.19

1.24 PARCEL 10
PARCEL 11
PARCEL 12
PARCEL 13
PARCEL 17
Building Parcel
PARCEL 02
PARCEL 07
PARCEL 30
PARCEL 15
PARCEL 18
PARCEL 04

1.16 0.21

1.18 2.27
New Pavement and Hardscape
Phase 1 Phase 2 Total
Total Number of Surface Parking Stalls: 1,755 371 2,126 spaces Total Surface Parking Area (9'x18' per stall): 880,017 215,557 1,095,574 square feet Total Non-Parking Asphalt Surface Area: 281,691 108,717 390,408 square feet Total Hardscape 266,103 25,729 291,832 square feet
Retention Basin 61,380 0 61,380 square feet
Total Prior Landscaping Numbers:1 520,808 81,183 601,991 square feet Percent Landscaping Per Phase:1 87% 13% 100%
Adjusted Landscaping:1 328,275 51,171 379,446 square feet 1 Prior site plan design landscaping numbers used to determine proportion between Phase 1 and Phase 2 landscaping to determine the Phase 1 and Phase 2 landscaped area based on the actual landscaping area of 379,446 square feet.

CalEEMod Land Use Inputs
Land Use Land Use Amount Metric Acres Landscaping (SF)
Phase 1
Regional Shopping Center (Retail, Casual Restaurant,
Market, & Health Club) 245,051 BSF 5.6256 328,275
Medical Office 9,129 BSF 0.2096
Fast Food Restaurant w/Drive Thru 16,871 BSF 0.3873
Self Storage 40,000 BSF 0.9183
Automated Carwash 4,100 BSF 0.0941
Convenience Market/Gas Station 428 BSF 0.0098
Surface Parking Lot 1,755 parking spaces 20.2024
Other Asphalt Surfaces 281,691 square feet 6.4667
Other Non-Asphalt Surfaces 3.036 acre 3.0362

36.9500
Phase 2
Regional Shopping Center (Retail & Restaurant) 89,952 BSF 1.7657 51,171 Surface Parking Lot 371 parking spaces 4.9485
Other Asphalt Surfaces 108,717 square feet 2.4958
Other Non-Asphalt Surfaces 0 square feet 0

9.2100
Phase 1 CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount Land Use Size Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail, Restaurant, Market, & Health Club Regional Shopping Center 245.051 1000bsf 5.63 245,051 328,275 Medical Office Medical Office 9.129 1000bsf 0.21 9,129
Gas Station Convenience Mart/Gas Station 40 pumps 0.01 428 Restaurant w/Drive-Thru Fast Food Restaurant w/Drive Thru 16.871 1000bsf 0.39 16,871 Automated Carwash Auto Repair 4.100 1000bsf 0.09 4,100
Storage Unrefrigerated Warehouse No Rail 40.000 1000bsf 0.92 40,000 Parking Parking Lot 1,755 stalls 20.20
Parking Other Asphalt Surfaces 281.691 1000bsf 6.47
Parking Other Non-Asphalt 3.036 Acre 3.04

36.95 315,579
Phase 2 CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount Land Use Size Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail, Restaurant, Market, & Health Club Regional Shopping Center 89.952 1000bsf 1.77 89,952 51,171 Parking Parking Lot 371 stalls 4.95
Parking Other Asphalt Surfaces 108.717 1000bsf 2.50
Parking Other Non-Asphalt 0.000 Acre 0.00

9.21 89,952
#REF!
Full Buildout CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount Land Use Size Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail, Restaurant, Market, & Health Club Regional Shopping Center 335.003 1000bsf 7.39 335,003 379,446 Medical Office Medical Office 9.129 1000bsf 0.21 9,129
Gas Station Convenience Mart/Gas Station 40 pumps 0.01 428 Restaurant w/Drive-Thru Fast Food Restaurant w/Drive Thru 16.871 1000bsf 0.39 16,871 Automated Carwash Auto Repair 4.100 1000bsf 0.09 4,100
Storage Unrefrigerated Warehouse No Rail 40.000 1000bsf 0.92 40,000 Parking Parking Lot 2,126 stalls 25.15
Parking Other Asphalt Surfaces 390.408 1000bsf 8.96
Parking Other Non-Asphalt 3.0361570248 Acre 3.04

46.16 405,531
Trip Generation and VMT1
1 Based on information provided by Integrated Engineering Group.

Weekday
Phase 1 Phase 2 Total
Shopping Center Daily Trips 8,894 3,268 12,162
Internal Capture (n/a) 0 0 0
Net Daily Trips 8,894 3,268 12,162
Pass-By Trips 2,579 948 3,527
Medical Office Daily Trips 295 n/a 295
Internal Capture (32% daily) 94 n/a 94
Net Daily Trips 201 n/a 201
Convenience Store w/Gas Station Daily Trips 10,196 n/a 10,196 Internal Capture (9% daily) 918 n/a 918
Net Daily Trips 9,278 n/a 9,278
Pass-By Trips 7,316 0 7,316
Fast Food Restaurant w/Drive-Thru Daily Trips 7,566 n/a 7,566 Internal Capture (35% daily) 2,648 n/a 2,648
Net Daily Trips 4,918 n/a 4,918
Pass-By Trips (55% Daily) 2,705 0 2,705
Automated Carwash Daily Trips 1,447 n/a 1,447
Internal Capture (71% daily) 1,025 n/a 1,025
Net Daily Trips 422 n/a 422
Pass-By Trips (70% Daily) 295 0 295
Self Storage Carwash Daily Trips 52 n/a 52
Internal Capture (9% daily) 5 n/a 5
Net Daily Trips 47 n/a 47
Total Net Daily Trips 23,760 3,268 27,028
Saturday
Phase 1 Phase 2 Total
Shopping Center Daily Trips 9,735 3,577 13,312
Internal Capture 9% daily) 876 322 1,198
Net Daily Trips 8,859 3,255 12,114
Medical Office Daily Trips 48 n/a 48
Internal Capture (54% daily) 26 n/a 26
Net Daily Trips 22 n/a 22
Convenience Store w/Gas Station Daily Trips 10,150 n/a 10,150 Internal Capture (9% daily) 914 n/a 914
Net Daily Trips 9,237 n/a 9,237
Fast Food Restaurant w/Drive-Thru Daily Trips 8,818 n/a 8,818 Internal Capture (25% daily) 2,205 n/a 2,205
Net Daily Trips 6,614 n/a 6,614
Automated Carwash Daily Trips 486 n/a 486
Internal Capture (9% daily) 44 n/a 44
Net Daily Trips 442 n/a 442
Self Storage Carwash Daily Trips 56 n/a 56
Internal Capture (9% daily) 5 n/a 5
Net Daily Trips 51 n/a 51
Total Net Daily Trips 25,224 3,255 28,479
Sunday
Phase 1 Phase 2 Total
Shopping Center Daily Trips 4,026 1,479 5,505
Internal Capture (9% daily) 362 133 495
Net Daily Trips 3,664 1,346 5,010
Medical Office Daily Trips 4 n/a 4
Internal Capture (25% daily) 1 n/a 1
Net Daily Trips 3 n/a 3
Convenience Store w/Gas Station Daily Trips 10,150 n/a 10,150 Internal Capture (9% daily) 914 n/a 914
Net Daily Trips 9,237 n/a 9,237
Fast Food Restaurant w/Drive-Thru Daily Trips 5,667 n/a 5,667 Internal Capture (26% daily) 1,473 n/a 1,473
Net Daily Trips 4,194 n/a 4,194
Automated Carwash Daily Trips 486 n/a 486
Internal Capture (9% daily) 44 n/a 44
Net Daily Trips 442 n/a 442
Self Storage Carwash Daily Trips 40 n/a 40
Internal Capture (9% daily) 4 n/a 4
Net Daily Trips 36 n/a 36
Total Net Daily Trips 17,575 1,346 18,921
Phase 1
Land Use
Adjusted Weekday Daily Trip Generation
Rate (trip per 1000BSF)
Adjusted Saturday
Daily Trip Generation
Rate (trip per
1000BSF)
Adjusted Sunday Daily Trip
Generation Rate (trip per
1000BSF)
Regional Shopping Center 36.29448563768 36.15104610877 14.95060211956 Medical Office 21.97392923650 2.41866579034 0.29970423924 Convenience Mart/Gas Station 231.95900000000 230.91250000000 230.91250000000 Fast Food Restaurant w/Drive Thru 291.50020745658 392.00403058503 248.56736411594 Auto Repair 102.92682926829 107.86829268293 107.86829268293 Self Storage 1.18300000000 1.27400000000 0.91000000000
Phase 2
Land Use
Adjusted Weekday Daily Trip Generation
Rate (trip per 1000BSF)
Adjusted Saturday
Daily Trip Generation
Rate (trip per
1000BSF)
Adjusted Sunday Daily Trip
Generation Rate (trip per
1000BSF)
Regional Shopping Center 36.33048737104 36.18674404127 14.96231323372 Full Buildout
Land Use
Adjusted Weekday Daily Trip Generation
Rate (trip per 1000BSF)
Adjusted Saturday
Daily Trip Generation
Rate (trip per
1000BSF)
Adjusted Sunday Daily Trip
Generation Rate (trip per
1000BSF)
Regional Shopping Center 36.30415250013 36.16063139733 14.95374668287 Medical Office 21.97392923650 2.41866579034 0.29970423924 Convenience Mart/Gas Station 231.95900000000 230.91250000000 230.91250000000 Fast Food Restaurant w/Drive Thru 291.50020745658 392.00403058503 248.56736411594 Auto Repair 102.92682926829 107.86829268293 107.86829268293 Self Storage 1.18300000000 1.27400000000 0.91000000000
Weekday Trip Sub-Type
Land Use Default Primary1 Default Diverted1
Total Primary and Diverted
Percentages Default Pass-By1
Total Trip Subtype
Percentages Adjusted Primary2 Adjusted Diverted Provided Pass-by Regional Shopping Center 38% 28% 66% 34% 100% 100% 0% 0% Medical Office 100% 0% 100% 0% 100% 100% 0% 0%
Convenience Mart/Gas Station 14% 21% 35% 65% 100% 100% 0% 0% Fast Food Restaurant w/Drive Thru 27% 24% 51% 50% 100% 100% 0% 0% Auto Repair 53% 11% 64% 36% 100% 100% 0% 0%
Self Storage 100% 0% 0%
Weekend Trip Sub-Type
Land Use Default Primary1 Default Diverted1 Default Pass-By1 Total Regional Shopping Center 43% 31% 26% 100%
Medical Office 100% 0% 0% 100%
Convenience Mart/Gas Station 100% 0% 0% 100%
Fast Food Restaurant w/Drive Thru 100% 0% 0% 100%
Auto Repair 100% 0% 0% 100%
Self Storage
1 CalEEMod v2022.
2 Changed to 100 percent as project vehicle miles traveled data is provided.

VMT
Weekday Saturday Sunday Total
Phase 1 Average Daily Trips 23,760 25,224 17,575 n/a
Phase 1 Annual Trips 6,194,595 1,315,270 916,426 8,426,291 Phase 2 Average Daily Trips 3,268 3,255 1,346 n/a
Phase 2 Annual Trips 852,011 169,730 70,179 1,091,920
Full Buildout Average Daily Trips 27,028 28,479 18,921 n/a Full Buildout Annual Trips1 7,046,606 1,485,001 986,605 9,518,211 Passenger Auto Small Truck Medium Truck Heavy Truck Total Full Buildout Daily VMT1 91,365 7,231 3,290 751 102,637 Percent Total VMT 89.02% 7.05% 3.21% 0.73% 100%
Full Buildout Total Daily VMT: 102,637 miles per day
Full Buildout Total Annual VMT (365 days/yr): 37,462,505 miles per year Full Buildout Total Annual Vehicle Trips: 9,518,211 trips per year Average Trip Distance (mi/trip): 3.9358766079 miles per trip Annual VMT Daily VMT
Scenario Annual Vehicle Trips Trip Distance Total Annual VMT Passenger Auto Small Truck Medium Truck Heavy Truck Passenger Auto Small Truck Medium Truck Heavy Truck Phase 1 8,426,291 3.94 33,164,841 29,522,548 2,336,535 1,063,090 242,669 80,884 6,401 2,913 665 Phase 2 1,091,920 3.94 4,297,664 3,825,677 302,780 137,760 31,446 10,481 830 377 86 Full Buildout 9,518,211 3.94 37,462,505 33,348,225 2,639,315 1,200,850 274,115 91,365 7,231 3,290 751 CalEEMod Daily to Annual Trips Conversion2
Weekday (days per year): 260.7133
Saturday (days per year): 52.1433
Sunday (days per year): 52.1433
1 Provided by Integrated Engineering Group.
2 CalEEMod V2022.1 methodology.

Architectural Coating
Phase 1
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable Surface
Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail, Restaurant, Market, & Health Club 245,051 2.0 490,102 367,577 122,526 Medical Office 9,129 2.0 18,258 13,694 4,565
Gas Station 428 2.0 856 642 214
Restaurant w/Drive-Thru 16,871 2.0 33,742 25,307 8,436
Automated Carwash 4,100 2.0 8,200 6,150 2,050
Storage 40,000 2.0 80,000 60,000 20,000
Non-Residential Sub-Total 473,369 157,790
Surface Parking Lot 880,017 0.06 52,801 n/a 52,801
Other Asphalt Surfaces 281,691 0.06 16,901 n/a 16,901
Other Non-Asphalt 132,255 0.06 7,935 n/a 7,935
Residential Sub-Total 0 77,638
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

Phase 2
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable Surface
Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail, Restaurant, Market, & Health Club 89,952 2.0 179,904 134,928 44,976 Non-Residential Sub-Total 134,928 44,976
Surface Parking Lot 215,557 0.06 12,933 n/a 12,933
Other Asphalt Surfaces 108,717 0.06 6,523 n/a 6,523
Other Non-Asphalt 0 0.06 0 n/a 0
Residential Sub-Total 0 19,456
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

Full Buildout
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable Surface
Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail, Restaurant, Market, & Health Club 335,003 2.0 670,006 502,505 167,502 Medical Office 9,129 2.0 18,258 13,694 4,565
Gas Station 428 2.0 856 642 214
Restaurant w/Drive-Thru 16,871 2.0 33,742 25,307 8,436
Automated Carwash 4,100 2.0 8,200 6,150 2,050
Storage 40,000 2.0 80,000 60,000 20,000
Non-Residential Sub-Total 608,297 202,766
Surface Parking Lot 1,095,574 0.06 65,734 n/a 65,734
Other Asphalt Surfaces 390,408 0.06 23,424 n/a 23,424
Other Non-Asphalt 132,255 0.06 7,935 n/a 7,935

3.036157025 Residential Sub-Total 0 97,094
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

Energy (Land Uses)
Phase 1 Building Square
Feet
Phase 2 Building Square
Feet
Full Buildout
Building Square
Feet
Phase 1 Solar Generation Per Year:1 935,329 kWh/yr 315,579 89,952 405,531 Phase 2 Solar Generation Per Year:1 266,604 kWh/yr 78% 22% 100% Full Buildout Solar Generation Per Year:2 1,201,933 kWh/yr Percentage of overall electricity by solar: 50%
1 Based on prorportion between Phase 1 and Phase 2 building square footage applied to the total projected 1,201,933 kWh/yr of renewable electricity generated from onsite PV systems under full buildout conditions. 2 Provided by Applicant
Phase 1
Land Use Electricity (kWh/yr)1
Tite 24 Standards -
Electricity (kWh/yr)2
Non-Title 24 Standards -
Electricity (kWh/yr)
Total Natural Gas
(kBTU/yr)1
Tite 24 Standards -
Natural Gas
(kBTU/yr)
Non-Title 24 Standards -
Natural Gas (kBTU/yr)
Regional Shopping Center 1,652,430 1,063,404.82 589,024.79 2,399,623 2,372,541.15 27,081.99 Medical Office 214,042 148,178.95 65,863.05 364,604 319,670.83 44,933.11 Convenience Market/Gas Station 25,106 11,606.93 13,499.06 14,278 9,713.10 4,564.75 Fast Food Restaurant w/Drive Thru 753,849 310,787.41 443,061.51 2,109,444 466,435.54 1,643,008.13 Automated Carwash 48,643 24,182.69 24,460.26 167,987 67,641.39 100,345.12 Storage 429,593 158,782.09 270,810.52 213,366 179,609.18 33,756.85 Surface Parking Lot 770,803 770,802.91 0
Total 3,894,465 5,269,301
1 CalEEMod v2022 defaults.
2 The 1,201,933 kWh/yr of renewable electricity generated from onsite PV systems is subtracted from the default Title 24 electricity demand for the Regional Shopping Center land use.

Phase 2
Land Use Electricity (kWh/yr)1
Tite 24 Standards -
Electricity (kWh/yr)2
Non-Title 24 Standards -
Electricity (kWh/yr)
Total Natural Gas
(kBTU/yr)1
Tite 24 Standards -
Natural Gas
(kBTU/yr)
Non-Title 24 Standards -
Natural Gas (kBTU/yr)
Regional Shopping Center 683,296 467,080.13 216,216.05 880,841 870,899.61 9,941.11 Surface Parking Lot 188,885 188,884.87 0.00 0 0 0
Total 872,181 880,841
1 CalEEMod v2022 defaults.
2 The 1,201,933 kWh/yr of renewable electricity generated from onsite PV systems is subtracted from the default Title 24 electricity demand for the Regional Shopping Center land use.

Full Buildout
Land Use Total Electricity (kWh/yr)1
Tite 24 Standards -
Electricity (kWh/yr)2
Non-Title 24 Standards -
Electricity (kWh/yr)
Total Natural Gas
(kBTU/yr)1
Tite 24 Standards -
Natural Gas
(kBTU/yr)
Non-Title 24 Standards -
Natural Gas (kBTU/yr)
Regional Shopping Center 2,335,726 1,530,484.95 805,241 3,280,464 3,243,440.76 37,023.10 Medical Office 214,042 148,178.95 65,863.05 364,604 319,670.83 44,933.11 Convenience Mart/Gas Station 25,106 11,606.93 13,499.06 14,278 9,713.10 4,564.75 Fast Food Restaurant w/Drive Thru 753,849 310,787.41 443,061.51 2,109,444 466,435.54 1,643,008.13 Auto Repair 48,643 24,182.69 24,460.26 167,987 67,641.39 100,345.12 Unrefrigerated Warehouse No Rail 429,593 158,782.09 270,810.52 213,366 179,609.18 33,756.85 Parking Lot 959,688 959,687.78 0.00 0 0 0
Total 4,766,646 6,150,142
5,968,579
1 CalEEMod v2022 defaults.
2 The 1,201,933 kWh/yr of renewable electricity generated from onsite PV systems is subtracted from the default Title 24 electricity demand for the Regional Shopping Center land use.

Water Use
Total Daily Water Demand:1 148,925 gallons per day
Total Annual Water Demand:2 54,357,625 gallons per year (365 days/yr) Development Phase Total Acreage
Proportion of Acreage
(%)
Daily Outdoor Water
(gpd)1
Total Annual Outdoor
Water Generation (gpy)2
Phase 1 37 80% 119,211 43,512,007
Phase 2 9 20% 29,714 10,845,618
Total 46 100% 148,925 54,357,625
1 Total daily outdoor water based on PlaceWorks. 2026, March. Water Supply and Demand Analysis Coffee and Rosedale Commercial Retail Development Project. 2 Based on 365 days per year.

Phase 1 CalEEMod Inputs
Land Use Indoor (gpy)1 Outdoor (gpy)1
Total Water Demand
(gpy)1
Retail, Restaurant, Market, & Health Club 43,512,007 0 43,512,007 43512007.01 Medical Office 0 0 0
Gas Station 0 0 0
Restaurant w/Drive-Thru 0 0 0
Automated Carwash 0 0 0
Storage 0 0 0
Total 43,512,007 0 43,512,007
Phase 2 CalEEMod Inputs
Land Use Indoor (gpy)1 Outdoor (gpy)1
Total Water Demand
(gpy)1
Retail, Restaurant, Market, & Health Club 10,845,618 0.000 10,845,618 10,845,617.99 10,845,618 Total 10,845,618 0 10,845,618
Full Buildout CalEEMod Inputs
Land Use Indoor (gpy)1 Outdoor (gpy)1
Total Water Demand
(gpy)1
Retail, Restaurant, Market, & Health Club 54,357,625 0 54,357,625 Medical Office 0 0 0
Gas Station 0 0 0
Restaurant w/Drive-Thru 0 0 0
Automated Carwash 0 0 0
Storage 0 0 0
Total 54,357,625 0 54,357,625
148,925 0 148,925
1 For purposes of this analysis, total water demand is modeled as indoor water and all indoor water demand is assigned to the regional shopping center land use.

Solid Waste1
1 CalEEMod v2022 defaults.

Phase 1
Land Use Annual Solid Waste Generated (tpy)
Regional Shopping Center 257.30
Medical Office 98.59
Convenience Mart/Gas Station 16.95
Fast Food Restaurant w/Drive Thru 194.34
Automated Carwash 15.66
Storage 37.60
Total 620.44
Phase 2
Land Use Annual Solid Waste Generated (tpy)
Regional Shopping Center 94.45
Total 94.45
1 CalEEMod v2022 defaults.

Full Buildout
Land Use Annual Solid Waste Generated (tpy)
Regional Shopping Center 351.75
Medical Office 98.59
Convenience Mart/Gas Station 16.95
Fast Food Restaurant w/Drive Thru 194.34
Automated Carwash 15.66
Self-Storage 37.60
Total 714.89
Reduction Measure GHG-1 All-Electric Energy Demand Worksheet: Riverview Marketplace Phase 1 Building Square Feet Phase 2 Building Square Feet Full Buildout Building Square
Feet
Phase 1 Solar Generation Per Year:1 935,329 kWh/yr 315,579 89,952 405,531 Phase 2 Solar Generation Per Year:1 266,604 kWh/yr 78% 22% 100% Full Buildout Solar Generation Per Year:2 1,201,933 kWh/yr Percentage of overall electricity by solar: 50%
1 Based on prorportion between Phase 1 and Phase 2 building square footage applied to the total projected 1,201,933 kWh/yr of renewable electricity generated from onsite PV systems under full buildout conditions. 2 Provided by Applicant
Table 1: Default CalEEMod Energy Use
Land Use Subtype
Total Annual Electricity Consumption
(kWh/year)
Total Annual Natural Gas
Consumption (kBTU/year)
Title-24 Electricity Energy
Intensity (kWhr/year)
Title-24 Natural Gas Energy
Intensity (KBTU/year)
Non Title-24 Electricity Energy
Intensity (kWhr/year)
Non Title-24 Natural Gas
Energy Intensity (KBTU/year)
Regional Shopping Center 1,652,429.61 2,399,623.14 1,063,404.82 2,372,541.15 589,024.79 27,081.99 Medical Office 214,042.00 364,603.94 148,178.95 319,670.83 65,863.05 44,933.11 Convenience Market/Gas Station 25,105.99 14,277.85 11,606.93 9,713.10 13,499.06 4,564.75 Fast Food Restaurant w/Drive Thru 753,848.92 2,109,443.67 310,787.41 466,435.54 443,061.51 1,643,008.13 Automated Carwash 48,642.95 167,986.51 24,182.69 67,641.39 24,460.26 100,345.12 Storage 429,592.61 213,366.03 158,782.09 179,609.18 270,810.52 33,756.85 Surface Parking Lot 770,802.91 0.00 770,802.91 0.00
Regional Shopping Center 683,296.18 880,840.72 467,080.13 870,899.61 216,216.05 9,941.11 Surface Parking Lot 188,884.87 0.00 188,884.87 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00
Regional Shopping Center 2,335,725.79 3,280,463.86 1,530,484.95 3,243,440.76 805,240.84 37,023.10 Medical Office 214,042.00 364,603.94 148,178.95 319,670.83 65,863.05 44,933.11 Convenience Market/Gas Station 25,105.99 14,277.85 11,606.93 9,713.10 13,499.06 4,564.75 Fast Food Restaurant w/Drive Thru 753,848.92 2,109,443.67 310,787.41 466,435.54 443,061.51 1,643,008.13 Automated Carwash 48,642.95 167,986.51 24,182.69 67,641.39 24,460.26 100,345.12 Storage 429,592.61 213,366.03 158,782.09 179,609.18 270,810.52 33,756.85 Surface Parking Lot 959,687.78 0.00 959,687.78 0.00 0.00 0.00 Building Square Footage
Phase 1 Phase 2 Total
Total Restaurant and Fast Casual Restaurant Space:1 22,996 8,799 31,795 Total Regional Shopping Center: 245,051 89,952 335,003
Percent Restaurant and Fast Casual Restaurant of Regional Shopping Center: 9.38% 9.78% 9.49% 1 Total building square footage of the non-drive-thru restaurant uses modeled under the Regional Shopping Center land use.

Phase 1
Phase 2
Full Buildout
Table 2: Adjusted CalEEMod Energy Use
Land Use Subtype
Total Annual Electricity Consumption
(kWh/year)
Total Annual Natural Gas
Consumption (kBTU/year)
Title-24 Electricity Energy
Intensity (kWhr/year)1
Title-24 Natural Gas Energy
Intensity (KBTU/year)
Non Title-24 Electricity Energy
Intensity (kWhr/year)1
Non Title-24 Natural Gas
Energy Intensity (KBTU/year)
Regional Shopping Center2 2,289,721.07 225,184.69 1,693,503.85 222,643.27 596,217.22 2,541.42 Medical Office 320,901.30 0.00 241,869.11 0.00 79,032.19 0.00 Convenience Market/Gas Station 29,290.59 0.00 14,453.68 0.00 14,836.91 0.00 Fast Food Restaurant w/Drive Thru 753,848.92 2,109,443.67 310,787.41 466,435.54 443,061.51 1,643,008.13 Automated Carwash 97,876.98 0.00 44,007.25 0.00 53,869.73 0.00 Storage 492,126.62 0.00 211,422.53 0.00 280,704.09 0.00 Surface Parking Lot 770,802.91 0.00 770,802.91 0.00 0.00 0.00 Regional Shopping Center2 916,202.95 86,162.81 697,358.33 85,190.39 218,844.62 972.43 Surface Parking Lot 188,884.87 0.00 188,884.87 0.00 0.00 0.00 Regional Shopping Center2 3,205,924.02 311,347.51 2,390,862.18 307,833.66 815,061.84 3,513.85 Medical Office 320,901.30 0.00 241,869.11 0.00 79,032.19 0.00 Convenience Market/Gas Station 29,290.59 0.00 14,453.68 0.00 14,836.91 0.00 Fast Food Restaurant w/Drive Thru 753,848.92 2,109,443.67 310,787.41 466,435.54 443,061.51 1,643,008.13 Automated Carwash 97,876.98 0.00 44,007.25 0.00 53,869.73 0.00 Storage 492,126.62 0.00 211,422.53 0.00 280,704.09 0.00 Surface Parking Lot 959,687.78 0.00 959,687.78 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00
Totals 11,719,312.41 4,841,582.35 8,346,179.87 1,548,538.40 3,373,132.54 3,293,043.96 Notes: Adjusted estimates assume 3.412 kBTU per kWh.
1 Accounts for the equivalent natural gas energy consumption in kilowatt hour per year. Natural gas to electricity consumption is based on a conversion factor of 3.412 kBTU/kWH applied to the net change in natural gas consumption shown in Table 1 and Table 2. 2 Natural gas consumption shown is associated with the restaurant and fast casual restaurant uses, which would be exempted from the Reduction Measure GHG-1 all-electric equipment and would be permitted to be connected to natural gas infrastructure. https://portfoliomanager.energystar.gov/pdf/reference/Thermal%20Conversions.pdf Full Buildout
Phase 1
Phase 2
Multiplier to get GJ
(US & Canada)
These multipliers are standard conversion factors, independent of fuel-specific heat content that are used to convert between kWh, kBtu, and GJ.
http://www.eia.doe.gov/basics/conversion basics.html
kWh (thousand Watt-hours)
MWh (million Watt-hours)
kBtu (thousand Btu)
MBtu/MMBtu (million Btu)
GJ (billion joules)
Multiplier to get kBtu
(US & Canada)

0.00 360

3.60 0.00106

1.06 1

3.412
3412
1 1000
947.817
Changes to the CalEEMod Defaults - Fleet Mix Years 2027: Overall Worksheet Commercial
Default HHD LDA LDT1 LDT2 LHD1 LHD2 MCY MDV MH MHD OBUS SBUS UBUS FleetMix (Model Default) 3.739130 43.460199 3.675691 21.234138 3.536969 1.113053 2.055488 18.983933 0.377052 1.551915 0.060742 0.177182 0.034508 100 FleetMix (Model Default) 0.037391 0.434602 0.036757 0.212341 0.035370 0.011131 0.020555 0.189839 0.003771 0.015519 0.000607 0.001772 0.000345 100% Percent 3.74% 89.41% 4.65% 2.20% 100%
Proportion 1.000000 0.486081 0.041111 0.237493 0.760635 0.239365 0.022990 0.212326 0.171278 0.704968 0.027592 0.080486 0.015676 100.00% 100.00% 1.000000 1.000000

1.000000 0.486081 0.041111 0.237493 0.760635 0.239365 0 0.212326 0 0.704968 0 0 0

1.000000 1.000000 1.000000 0.704968

1.000000 0.486081 0.041111 0.237493 0.760635 0.239365 0.022990 0.212326 0 1.000000 0 0 0 Assumed Mix 0.73% 89.02% 7.05% 3.21% 100.00%
Adjusted with Assumed 0.007317 0.432697 0.036596 0.211411 0.053588 0.016864 0 0.189007 0 0.032055 0 0 0 100% 1% 43% 4% 21% 5% 2% 2% 19% 0% 3% 0% 0% 0% 100%
Modified 0.007317 0.432697 0.036596 0.211411 0.053588 0.016864 0 0.189007 0 0.032055 0 0 0 100.0%

0.73% 89.02% 7.05% 3.21%
Adjusted CalEEMod Inputs 0.7317049407133880 43.2697313983933000 3.6595820250825900 21.1410779812680000 5.3588390102638300 1.6863786013187400 2.0464796257475500 18.9007347062312000 0 3.2054717109814200 0 0 0 Changes to the CalEEMod Defaults - Fleet Mix Years 2027: Overall Worksheet Commercial
Default HHD LDA LDT1 LDT2 LHD1 LHD2 MCY MDV MH MHD OBUS SBUS UBUS FleetMix (Model Default) 3.819885 43.442294 3.587673 21.697754 3.446036 1.079640 2.040300 18.671434 0.359311 1.585872 0.059111 0.175690 0.035002 100 FleetMix (Model Default) 0.038199 0.434423 0.035877 0.216978 0.034460 0.010796 0.020403 0.186714 0.003593 0.015859 0.000591 0.001757 0.000350 100% Percent 3.82% 89.44% 4.53% 2.21% 100%
Proportion 1.000000 0.485717 0.040113 0.242597 0.761441 0.238559 0.022812 0.208761 0.162218 0.715974 0.026687 0.079319 0.015802 100.00% 100.00% 1.000000 1.000000

1.000000 0.485717 0.040113 0.242597 0.761441 0.238559 0 0.208761 0 0.715974 0 0 0

1.000000 1.000000 1.000000 0.715974

1.000000 0.485717 0.040113 0.242597 0.761441 0.238559 0.022812 0.208761 0 1.000000 0 0 0 Assumed Mix 0.73% 89.02% 7.05% 3.21% 100.00%
Adjusted with Assumed 0.007317 0.432374 0.035708 0.215954 0.053645 0.016807 0 0.185834 0 0.032055 0 0 0 100% Trips 208 12,314 1,017 6,150 1,528 479 578 5,292 0 913 0 0 0 28,479 1% 43% 4% 22% 5% 2% 2% 19% 0% 3% 0% 0% 0% 100%
Modified 0.007317 0.432374 0.035708 0.215954 0.053645 0.016807 0 0.185834 0 0.032055 0 0 0 100.0%

0.73% 89.02% 7.05% 3.21%
Adjusted CalEEMod Inputs 0.7317049407133880 43.2373949277349000 3.5707516825941600 21.5954144674458000 5.3645190187778500 1.6806985928047200 2.0306763498428400 18.5833683091049000 0 3.2054717109814200 0 0 0 Peak Hour Turning Movement Worksheet1
1 Integrated Engineering Group. 2026, January. Riverview Market Transportation Analysis.

AM Peak Hour: Year 2028 with Project
Intersection SB Right SB Thru SB Left EB Right EB Thru EB Left NB Left NB Thru NB Right WB Left WB Thru WB Right Total 1 34 12 33 36 1,156 32 9 4 0 2 830 38 2,186
2 165 1,188 188 246 737 402 290 1,303 259 140 660 152 5,730 3 50 7 86 72 1,335 67 99 6 38 87 808 61 2,716
4 112 48 223 99 1,217 120 85 43 50 14 809 89 2,909
5 253 949 123 162 535 126 244 670 251 331 783 133 4,560 6 99 77 354 20 717 80 52 28 42 29 537 102 2,137
7 14 56 41 247 651 24 129 26 181 111 458 21 1,959
8 34 12 33 32 1,156 36 9 4 0 2 830 38 2,186
9 0 0 0 32 803 0 72 0 97 38 595 0 1,637
10 152 1,185 248 298 370 189 227 919 135 145 332 238 4,438 11 9 16 29 157 729 6 154 6 167 95 497 12 1,877
12 15 176 83 196 440 64 130 92 252 193 256 55 1,952
13 82 37 231 25 605 56 42 50 139 44 265 73 1,649
14 26 1,175 160 378 334 22 199 885 202 151 165 101 3,798 15 48 602 43 218 1,003 49 145 487 174 235 551 43 3,598
16 177 737 170 156 828 146 196 615 135 152 526 73 3,911 17 18 939 44 280 91 43 180 876 211 163 106 59 3,010
18 27 1,287 60 36 4 17 52 1,245 120 89 10 78 3,025
19 171 1,238 0 193 0 137 180 1,289 0 0 0 0 3,208
20 51 1,636 10 212 0 44 275 1,719 73 60 0 12 4,092
21 625 1,707 0 203 0 319 0 1,735 0 0 0 0 4,589
22 0 1,521 385 0 0 0 0 1,648 724 411 0 88 4,777
23 455 979 274 63 324 166 243 1,626 163 199 522 344 5,358 24 113 1,028 0 248 0 200 107 625 0 0 0 0 2,321
25 92 789 388 186 793 135 88 493 195 211 388 161 3,919
26 55 1,102 52 185 87 57 99 695 63 88 36 71 2,590
27 0 52 109 0 0 0 0 84 7 6 0 94 352
28 0 0 0 29 1,461 0 0 0 25 0 912 0 2,427
29 0 0 0 28 1,450 0 0 0 24 0 957 0 2,459
30 0 0 0 21 1,347 0 0 0 38 0 956 0 2,362
31 36 1,679 0 19 0 0 0 1,852 0 0 0 0 3,586
32 0 1,726 0 19 0 0 0 2,067 0 0 0 0 3,812
MIN 352
MAX 5,730
PM Peak Hour: Year 2028 with Project
Intersection SB Right SB Thru SB Left EB Right EB Thru EB Left NB Left NB Thru NB Right WB Left WB Thru WB Right Total 1 53 0 50 12 1,023 30 15 2 2 3 1,523 24 2,737
2 235 1,289 250 391 759 318 405 1,506 198 245 1,025 244 6,865 3 106 12 168 118 1,257 150 188 12 70 142 1,358 134 3,715 4 156 72 221 161 1,266 146 161 56 32 60 1,442 44 3,817
5 210 919 187 367 983 240 325 1,098 426 281 678 191 5,905 6 114 76 202 20 787 111 47 38 40 39 1,073 302 2,849
7 4 19 44 87 811 20 115 32 142 148 768 18 2,208
8 53 0 50 12 1,023 30 15 2 2 3 1,523 24 2,737
9 0 0 0 58 612 0 51 0 53 74 947 0 1,795
10 162 1,287 207 169 274 198 224 1,397 118 184 393 291 4,904 11 11 4 16 27 527 10 35 3 82 60 710 32 1,517
12 13 98 52 161 277 24 159 174 195 247 314 86 1,800
13 53 31 113 45 348 42 38 33 57 55 339 93 1,247
14 64 1,027 151 206 144 40 445 1,287 158 102 235 144 4,003 15 83 650 67 149 464 42 248 681 191 201 827 43 3,646
16 116 798 151 137 505 124 345 959 211 189 709 88 4,332 17 29 1,090 24 204 66 67 234 1,274 194 256 124 78 3,640 18 41 1,464 80 87 20 47 87 1,552 97 133 34 101 3,743
19 254 1,447 0 160 0 258 302 1,565 0 0 0 0 3,986
20 81 1,859 14 397 0 81 446 1,863 107 89 0 74 5,011
21 693 1,898 0 168 0 290 0 1,989 0 0 0 0 5,038
22 0 1,805 238 0 0 0 0 1,715 397 907 0 277 5,339
23 331 1,773 339 155 531 321 159 1,194 215 306 672 399 6,395 24 145 1,041 0 160 0 143 212 1,156 0 0 0 0 2,857
25 109 830 222 183 527 153 201 935 221 246 836 301 4,764 26 62 1,155 30 206 77 38 180 1,313 90 89 123 49 3,412
27 0 118 175 0 0 0 0 74 12 12 0 175 566
28 0 0 0 48 1,471 0 0 0 47 0 1,646 0 3,212
29 0 0 0 48 1,477 0 0 0 48 0 1,652 0 3,225
30 0 0 11 36 1,398 0 0 0 58 0 1,634 0 3,137
31 60 1,865 0 35 0 0 0 2,109 0 0 0 0 4,069
32 0 1,898 0 35 0 0 0 2,416 0 0 0 0 4,349
MIN 566
MAX 6,865
Average Daily Traffic Volumes1
1 Data provided by Integrated Engineering Group.

Existing 2025 2027 Cumulative 2027 + Cumulative + Ph I 2028 Cumulative 2028 + Cumulative + Ph I-II Project Net Change HY 2046 HY 2046 + Ph I-II Roadway Segment ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) ADT (BOTH DIRECTIONS) Posted Speed Limit
Grade
Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 22291 22291 23160 22292 23347 1055 22295 23350 50 0 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 25807 25807 27165 25808 27456 1648 25812 27460 50 0 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way 31761 31762 34315 31762 34861 3099 31767 34866 50 0 Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade 33172 33173 36324 33173 36997 3824 33179 37003 50 0 Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 34182 34183 35867 34183 36227 2044 34189 36233 50 0 Rosedale Highway (CA-58) Coffee Road to Patton Way 30790 30791 31389 30791 31516 725 30796 31521 50 0 Coffee Road Olive Drive to Hageman Road 24459 24930 25908 25165 26352 1187 29403 30590 55 0 Coffee Road Hageman Road to Meany Avenue/Riverlakes Drive 29066 29626 30930 29905 31487 1582 34941 36523 55 0 Coffee Road Riverlakes Drive/Meany Avenue to Downing Avenue 35841 36531 38269 36876 38986 2110 43085 45195 55 0 Coffee Road Downing Avenue to Granite Falls Drive 37867 38596 40552 38960 41333 2373 45521 47894 55 0 Coffee Road Granite Falls Drive to Rosedale Highway (CA-58) 35814 36414 38478 36714 39219 2505 42111 44616 55 0 Coffee Road Rosedale Highway (CA-58) to Jet Way 42426 43136 45309 43492 46129 2637 49886 52523 55 0 Coffee Road Jet Way to Brimhall Road 42941 43705 48594 44087 50021 5934 50966 56900 55 0 Coffee Road Brimhall Road to Westside Parkway EB Ramps 51734 52545 54772 52950 55653 2703 60245 62948 55 0 Coffee Road Westside Parkway EB Ramps to Truxtun Road 43166 43842 45906 44180 46685 2505 50267 52772 55 0 Coffee Road Truxtun Road and Stockdale Highway 52165 52238 53868 52275 54253 1978 52935 54913 55 0 Calloway Drive Noriega Road to Hageman Road 26639 26987 27422 27161 27688 527 30294 30821 55 0 Calloway Drive Hageman Road to Meacham Road 28037 28102 28645 28134 28793 659 28716 29375 55 0 Calloway Drive Meacham Road to Rosedale Highway (CA-58) 31286 31358 32010 31394 32185 791 32044 32835 55 0 Calloway Drive Rosedale Highway (CA-58) to Brimhall Road 38237 38538 39353 38689 39678 989 41402 42391 55 0 Brimhall Road Allen Road to Old Farm Road 8709 8810 9245 8860 9387 527 9766 10293 50 0 Brimhall Road Old Farm Road to Jewetta Avenue 10604 10727 11379 10788 11579 791 11891 12682 50 0 Brimhall Road Jewetta Avenue to Verdugo Lane 12485 12629 13716 12701 14020 1319 14000 15319 50 0 Brimhall Road Verdugo Lane to Calloway Drive 14892 15064 16259 15150 16600 1450 16699 18149 50 0 Brimhall Road Calloway Drive to Harvest Creek Road 16029 16214 17844 16307 18285 1978 17974 19952 50 0 Brimhall Road Harvest Creek Road to Coffee Road 16644 16929 18667 17072 19182 2110 19640 21750 50 0 Hageman Road Calloway Drive to Coffee Road 24360 25019 25128 25348 25480 132 31279 31411 45 0 Inputs
CalEEMod Land Use Inputs: Main Site Construction Assumptions Name: Riverview Market
Project Location: Kern County
Climate Zone: 5
Land Use Setting: Urban
Utility Company: PGE (electricity) & SoCalGas (gas)
General Info
Phase 1 Phase 2 Total
Project Site Area (Sq Ft): 1,609,641 401,089 2,010,730 square feet Disturbed Area (Sq Ft): 36.95 9.21 46.16

36.95227273 9.207727273 #REF! #REF! 0 46.16
Development Phasing
Phase 1 Phase 2
Offsite Street
Improvement (Left
Turn Lane)
Offsite Street
Improvement (Traffic
Signal)
What is the general construction schedule?
(month/year - month/year) 03/2026 - 12/2027 01/2028 - 12/2028 06/2026-12/2026 06/2026-12/2026 New Building Info (please mark building square footage to assume) Phase 1 Phase 2 Total Parcel Number of
Building Square Feet (BSF) Acreage Fuel Pumps
Pad 1 Drive-Thru Restaurant 2,500 2,500
Pad 1 Fast Casual Restaurant 5,548 5,548
Pad 1 Electrical/Fire Riser 176 176
Pad 2 Car Wash PARCEL 03 4,100 4,100 1.79
Pad 3 Drive-Thru Restaurant 510 510
Pad 3 Electrical/Fire Riser 250 250
Pad 4 Drive-Thru Restaurant PARCEL 09 4,277 4,277 1.29
Pad 5 Drive-Thru Restaurant 2,296 2,296
Pad 5 Fast Casual Restaurant 4,226 4,226
Pad 5 Electrical/Fire Riser 176 176
Pad 6 Drive-Thru Restaurant 2,444 2,444
Pad 6 Electrical/Fire Riser 134 134
Pad 7 Retail 4,560 4,560
Pad 7 Electrical/Fire Riser 134 134
Pad 8 Retail 4,560 4,560
Pad 8 Electrical/Fire Riser 134 134
Pad 9 Restaurant 7,822 7,822
Pad 9 Electrical/Fire Riser 145 145
Pad 10 Suite A Retail 3,028 3,028
Pad 10 Suite B Restaurant 1,844 1,844
Pad 10 Suite C Retail 1,520 1,520
Pad 10 Suite D Restaurant 1,794 1,794
Pad 10 Drive-Thru Restaurant 1,720 1,720
Pad 10 Electrical/Fire Riser 204 204
Pad 11 Drive-Thru Restaurant 2,740 2,740
Building Parcel
PARCEL 02 1.17
PARCEL 10 0.96
PARCEL 07 1.29
PARCEL 11 0.83
PARCEL 12 0.58
PARCEL 13 0.75
PARCEL 14 1.87
PARCEL 17 1.21
Pad 11 Retail 2,659 2,659
Pad 11 Retail 2,646 2,646
Pad 11 Retail 3,498 3,498
Pad 11 Electrical/Fire Riser 176 176
Pad 12 Medical Office 8,996 8,996
Pad 12 Electrical/Fire Riser 133 133
Pad 13 Restaurant 6,399 6,399
Pad 13 Electrical/Fire Riser 134 134
Pad 14 Restaurant 2,400 2,400
Pad 14 Retail 4,601 4,601
Pad 14 Electrical/Fire Riser 134 134
Shops 1 Suite A Retail 2,482 2,482
Shops 1 Suite B Retail 2,497 2,497
Shops 2 Suite A Retail 3,042 3,042
Shops 2 Suite B Retail 2,023 2,023
Shops 2 Suite C Retail 2,081 2,081
Shops 2 Suite D Fast Casual Restaurant 1,762 1,762
Shops 2 Suite E Retail 1,950 1,950
Major A Health Club PARCEL 08 24,993 24,993 2.60
Major B Market PARCEL 16 34,999 34,999 3.78
Major C Retail PARCEL 20 21,927 21,927 1.34
Major D Retail PARCEL 21 22,927 22,927 1.21
Major E Retail PARCEL 23 27,863 27,863 1.59
Major F Retail PARCEL 24 25,329 25,329 1.10
Major G Retail PARCEL 26 26,326 26,326 1.21
Major H Retail PARCEL 27 23,927 23,927 1.33
Major I Retail PARCEL 28 27,921 27,921 1.81
Major J Retail PARCEL 29 24,436 24,436 1.88
Storage Building PARCEL 01 40,000 40,000 1.68
Gas Station - Controller Office 308 308
Gas Station - Controller Storage 120 120
Gas Station Canopy n/a n/a 40
No Buildings PARCEL 05 n/a n/a 2.37
No Buildings PARCEL 06 n/a n/a 3.54
TOTAL 315,579 89,952 405,531 46.16 40
New Pavement and Hardscape
Phase 1 Phase 2 Total
Total Number of Surface Parking Stalls: 1,755 371 2,126 spaces Total Surface Parking Area (9'x18' per stall): 880,017 215,557 1,095,574 square feet Total Non-Parking Asphalt Surface Area: 281,691 108,717 390,408 square feet Total Hardscape 266,103 25,729 291,832 square feet
Retention Basin 61,380 0 61,380 square feet
Total Landscaping:1 520,808 81,183 601,991 square feet
1 Construction modeling assumed these landscaping numbers although the actual landscaping proposed is 379,446 square feet. However, the landscaping does not account for any construction-related emissions.

PARCEL 18 1.18
PARCEL 04 2.27
PARCEL 25 1.73
PARCEL 30 1.16
PARCEL 15 0.21
PARCEL 19 1.19
PARCEL 22 1.24
CalEEMod Land Use Inputs
Land Use Land Use Amount Metric Acres Landscaping (SF)
Phase 1
Regional Shopping Center (Retail, Casual Restaurant,
Market, & Health Club) 245,051 BSF 5.6256 520,808
Medical Office 9,129 BSF 0.2096
Fast Food Restaurant w/Drive Thru 16,871 BSF 0.3873
Self Storage 40,000 BSF 0.9183
Automated Carwash 4,100 BSF 0.0941
Convenience Market/Gas Station 428 BSF 0.0098
Surface Parking Lot 1,755 parking spaces 20.2024
Other Asphalt Surfaces 281,691 square feet 6.4667
Other Non-Asphalt Surfaces 3.036 acre 3.0362

36.9500
Phase 2
Regional Shopping Center (Retail & Restaurant) 89,952 BSF 1.7657 81,183 Surface Parking Lot 371 parking spaces 4.9485
Other Asphalt Surfaces 108,717 square feet 2.4958
Other Non-Asphalt Surfaces 0 square feet 0.0000

9.2100
Phase 1 CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount
Land Use Size
Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail, Restaurant, & Health Club Regional Shopping Center 245.051 1000bsf 5.63 245,051 520,808 Medical Office Medical Office 9.129 1000bsf 0.21 9,129
Gas Station Convenience Mart/Gas Station 40 pumps 0.01 428 Restaurant w/Drive-Thru Fast Food Restaurant w/Drive Thru 16.871 1000bsf 0.39 16,871 Automated Carwash Auto Repair 4.100 1000bsf 0.09 4,100
Storage Unrefrigerated Warehouse No Rail 40.000 1000bsf 0.92 40,000 Parking Parking Lot 1,755 stalls 20.20
Parking Other Asphalt Surfaces 281.691 1000bsf 6.47
Parking Other Non-Asphalt 3.036 Acre 3.04

36.95 315,579
Phase 2 CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount
Land Use Size
Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail & Restaurants Regional Shopping Center 89.952 1000bsf 1.77 89,952 81,183 Parking Parking Lot 371 stalls 4.95
Parking Other Asphalt Surfaces 108.717 1000bsf 2.50
Parking Other Non-Asphalt 0.000 Acre 0.00

9.21 89,952
#REF!
Full Buildout CalEEMod Inputs
Type Land Use Type
Land Use Unit
Amount
Land Use Size
Metric Lot Acreage
Land Use Square
Feet Landscaping (SF)
Retail, Restaurant, & Health Club Regional Shopping Center 335.003 1000bsf 7.39 335,003 601,991 Medical Office Medical Office 9.129 1000bsf 0.21 9,129
Gas Station Convenience Mart/Gas Station 40 pumps 0.01 428 Restaurant w/Drive-Thru Fast Food Restaurant w/Drive Thru 16.871 1000bsf 0.39 16,871 Automated Carwash Auto Repair 4.100 1000bsf 0.09 4,100
Storage Unrefrigerated Warehouse No Rail 40.000 1000bsf 0.92 40,000 Parking Parking Lot 2,126 stalls 25.15
Parking Other Asphalt Surfaces 390.408 1000bsf 8.96
Parking Other Non-Asphalt 3.0361570248 Acre 3.04

46.16 405,531
Asphalt Demolition
Total Asphalt Demolition Debris Amount: 575 tons
Phases Amount to be Exported (CY)1
Haul Truck Capacity
(CY)2 Haul Distance (mile)2 Total Trip Ends Duration (days) Trip Ends/Day Demolition 575 14 20.00 84 1 84
1 Provided by project applicant.
2 CalEEMod default.

Architectural Coating
Phase 1
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable
Surface Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail, Restaurant, & Health Club 245,051 2.0 490,102 367,577 122,526 Medical Office 9,129 2.0 18,258 13,694 4,565
Gas Station 428 2.0 856 642 214
Restaurant w/Drive-Thru 16,871 2.0 33,742 25,307 8,436
Automated Carwash 4,100 2.0 8,200 6,150 2,050
Storage 40,000 2.0 80,000 60,000 20,000
Non-Residential Sub-Total 473,369 157,790
Parking Lot 880,017 0.06 52,801 n/a 52,801
Other Asphalt Surfaces 281,691 0.06 16,901 n/a 16,901
Other Non-Asphalt 132,255 0.06 7,935 n/a 7,935
Residential Sub-Total 0 77,638
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

Phase 2
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable
Surface Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail & Restaurant 89,952 2.0 179,904 134,928 44,976
Non-Residential Sub-Total 134,928 44,976
Parking Lot 215,557 0.06 12,933 n/a 12,933
Other Asphalt Surfaces 108,717 0.06 6,523 n/a 6,523
Other Non-Asphalt 0 0.06 0 n/a 0
Residential Sub-Total 0 19,456
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

Full Buildout
Land Use Land Use Amount (BSF)
CalEEMod Paintable
Surface Area
Multiplier*
Total Paintable
Surface Area (BSF)
Total Paintable Interior
Surface Area (BSF)*
Total Paintable
Exterior Surface
Area (BSF)*
Retail, Restaurant, & Health Club 335,003 2.0 670,006 502,505 167,502 Medical Office 9,129 2.0 18,258 13,694 4,565
Gas Station 428 2.0 856 642 214
Restaurant w/Drive-Thru 16,871 2.0 33,742 25,307 8,436
Automated Carwash 4,100 2.0 8,200 6,150 2,050
Storage 40,000 2.0 80,000 60,000 20,000
Non-Residential Sub-Total 608,297 202,766
Parking Lot 1,095,574 0.06 65,734 n/a 65,734
Other Asphalt Surfaces 390,408 0.06 23,424 n/a 23,424
Other Non-Asphalt 132,255 0.06 7,935 n/a 7,935

3.036157025 Residential Sub-Total 0 97,094
*Based on CalEEMod methodology in calculating the paintable surface areas for a nonresidential building and parking lot.

CalEEMod Construction Run Land Use Inputs: Offsite Improvement - Left Turn Lane Name: Rosedale & Coffee
Project Location: Kern County
Land Use Setting: Urban
Land Use Land Use Amount1 Metric
Left Turn Lane 8,305 square feet
1 Measured based on estimated area.

Asphalt Demolition
l Asphalt Demolition Debris Amount: 575 tons
Phases
Amount to be Exported
(tons)1
Haul Truck
Capacity (ton)2
Haul Distance
(mile)2 Total Trip Ends
Duration
(days)
Trip
Ends/Day
Demolition 575 8 20.00 144 5 29
1 Provided by project applicant.
2 CalEEMod default.

Type Land Use Type
Land Use Unit
Amount
Land Use
Size Metric Lot Acreage
Land Use
Square Feet
Parking Lot Other Asphalt 8.305 1000sqft 0.19 0
Architectural Coating
Land Use Land Use Amount (BSF)
CalEEMod
Paintable
Surface Area
Multiplier*
Total
Paintable
Surface Area
(BSF)
Total Paintable
Interior Surface
Area (BSF)*
Total
Paintable
Exterior
Surface Area
(BSF)*
Parking Lot 8,305 0.06 498 n/a 498
Parking Sub-Total 0 498
*Based on CalEEMod methodology in calculating the paintable surface areas for a parking lot.

CalEEMod Construction Run Land Use Inputs: Offsite Improvement - Traffic Signal Name: Rosedale & Coffee
Project Location: Kern County
Land Use Setting: Urban
Land Use Land Use Amount1 Metric
Left Turn Lane 400 square feet
1 Measured based on estimated area.

Type Land Use Type
Land Use Unit
Amount
Land Use
Size Metric Lot Acreage
Land Use
Square Feet
Parking Lot Other Asphalt 0.400 1000sqft 0.01 0
Architectural Coating
Land Use Land Use Amount (BSF)
CalEEMod
Paintable
Surface Area
Multiplier*
Total
Paintable
Surface Area
(BSF)
Total Paintable
Interior Surface
Area (BSF)*
Total
Paintable
Exterior
Surface Area
(BSF)*
Parking Lot 400 0.06 24 n/a 24
Parking Sub-Total 0 24
*Based on CalEEMod methodology in calculating the paintable surface areas for a parking lot. * Provided by the project applicant.

Construction Activities
Start Date End Date
Duration
(Workday) Worker Trips/Day Vendor Trips/Day
Phase 1
Site Preparation 03/16/2026 03/20/2026 5.00 6.00 0.00
Rough Grading 03/23/2026 04/03/2026 10.00 10.00 0.00
Fine Grading 06/08/2026 06/26/2026 15.00 6.00 0.00
Utility Trenching 04/06/2026 06/05/2026 45.00 18.00 0.25 Building Construction 03/30/2026 12/28/2026 180.00 60.00 2.00 Paving 06/29/2026 07/10/2026 10.00 16.00 12.00
Finishing/Landscaping 07/13/2026 10/09/2026 85.00 20.00 1.00 Phase 2
Site Preparation 01/04/2027 01/08/2027 5.00 6.00 0.00
Rough Grading 01/11/2027 01/22/2027 10.00 10.00 0.00
Fine Grading 02/22/2027 03/05/2027 10.00 5.00 0.00
Utility Trenching 01/25/2027 02/19/2027 20.00 12.00 1.00 Building Construction 01/18/2027 07/23/2027 135.00 60.00 2.00 Paving 03/08/2027 03/12/2027 5.00 16.00 8.00
Finishing/Landscaping 03/15/2027 04/30/2027 40.00 15.00 1.00 Offsite Improvements (Turning Lane)
Demolition 06/08/2026 06/12/2026 5.00 4.00 0.00
Site Preparation 06/15/2026 06/19/2026 5.00 4.00 0.00
Rough Grading 06/22/2026 07/03/2026 10.00 4.00 0.00
Fine Grading 08/03/2027 08/07/2027 5.00 4.00 0.00
Paving 08/10/2027 08/14/2027 5.00 6.00 4.00
Offsite Improvements (Traffic Signal)
Utility Trenching 07/06/2026 07/31/2026 20 6 1
Traffic Signal Installation 08/17/2027 09/11/2027 20 2 1 Phase 1 CalEEMod Inputs
Construction Activity Start Date End Date Workdays
Site Preparation 03/16/2026 03/20/2026 5
Rough Grading 03/23/2026 04/03/2026 10
Building Construction 03/30/2026 12/28/2026 196
Utility Trenching 04/06/2026 06/05/2026 45
Fine Grading 06/08/2026 06/26/2026 15
Paving 06/29/2026 07/10/2026 10
Finishing and Landscaping 07/13/2026 10/09/2026 65
Architectural Coating 10/13/2026 12/28/2026 55
Phase 2 CalEEMod Inputs
Construction Activity Start Date End Date Workdays
Site Preparation 01/04/2027 01/08/2027 5
Rough Grading 01/11/2027 01/22/2027 10
Building Construction 01/18/2027 07/23/2027 135
Utility Trenching 01/25/2027 02/19/2027 20
Fine Grading 02/22/2027 03/05/2027 10
Paving 03/08/2027 03/12/2027 5
Finishing and Landscaping 03/15/2027 04/30/2027 35
Architectural Coating 6/28/2027 07/23/2027 20
Left Turn Lane CalEEMod Inputs
Construction Activity Start Date End Date Workdays
Demolition 06/08/2026 06/12/2026 5
Site Preparation 06/15/2026 06/19/2026 5
Rough Grading 06/22/2026 07/03/2026 10
Fine Grading 08/03/2026 08/07/2026 5
Paving 08/10/2026 08/14/2026 5
Architectural Coating 8/17/2026 8/17/2026 1
Traffic Signal CalEEMod Inputs
Construction Activity Start Date End Date Workdays
Utility Trenching 07/06/2026 07/31/2026 20
Traffic Signal Installation 08/17/2026 09/11/2026 20
Construction Activities and Schedule Assumptions:

Construction Schedule
Construction Equipment Mix: Phase 1
*Based on information provided by the project applicant.

Equipment CalEEMod Equipment Pieces of Equipment Hrs Op HP LF Worker Trips/
Day
Vendor
Trips/Day
Onsite Truck
Travel Distance
(miles)
Site Preparation 12 2
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 1 n/a n/a 0.4125
Rough Grading 20 10
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Scraper Scrapers 2 8 423 0.48 n/a
Water truck1 5 n/a n/a 10 n/a
Onsite Truck2 1 n/a n/a 1.6500
Fine Grading 12 2
Skip Loader Tractors/Loaders/Backhoes 2 8 84 0.37 n/a
Motor Grader Grader 1 8 148 0.41 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 1 n/a n/a 0.4125
Utilities Trenching 36 2
Backhoe Tractors/Loaders/Backhoes 2 8 84 0.37 n/a
Excavator Excavators 2 8 36 0.38 n/a
Building Construction 120 4
Forklifts 2 8 82 0.20 n/a
Generator Sets 1 8 14 0.74
Welders 1 8 46 0.45
Asphalt Paving 32 24
Paving Machine Pavers 1 8 81 0.42 n/a
Skip loader Tractor/Loader/Backhoe 1 8 84 0.37 n/a
Roller Rollers 2 8 36 0.38 n/a
Architectural Coating Default Default
Air Compressors 1 6 37 0.48 n/a
Finishing/Landscaping 40 2
Skip Loader Tractor/Loader/Backhoe 1 8 84 0.37 n/a
Skid Steer Loader Skid Steer 1 8 71 0.37
1 Based on 10,000 gallons per acre disturbed and a 4,000 gallon water truck. 2005, June 5. Maricopa Air Quality Department. Guidance for Application for Dust 2 Represents onsite water truck travel distance and based on 0.825 mi/acre.

Construction Equipment Mix: Phase 2
*Based on information provided by the project applicant.

Equipment CalEEMod Equipment Pieces of Equipment Hrs Op HP LF Worker Trips/
Day
Vendor
Trips/Day
Onsite Truck
Travel Distance
(miles)
Site Preparation 12 2
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 1 n/a n/a 0.4125
Rough Grading 20 10
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Scraper Scrapers 2 8 423 0.48 n/a
Water truck1 5 n/a n/a 10 n/a
Onsite Truck2 1 n/a n/a 1.65
Fine Grading 10 2
Skip Loader Tractors/Loaders/Backhoes 2 8 84 0.37 n/a
Motor Grader Grader 1 8 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 1 n/a n/a 0.4125
Utilities Trenching 24 2
Backhoe Tractors/Loaders/Backhoes 2 8 84 0.37 n/a
Excavator Excavators 2 8 36 0.38 n/a
Building Construction 120 4
Forklifts 2 8 82 0.20 n/a
Generator Sets 1 8 14 0.74
Welders 1 8 46 0.45
Asphalt Paving 32 16
Paving Machine Pavers 1 8 n/a
Skip loader Tractor/Loader/Backhoe 1 8 n/a
Roller Rollers 2 8 36 0.38 n/a
Architectural Coating Default Default
Air Compressors 1 6 37 0.48 n/a
Finishing/Landscaping 30 2
Skip Loader Tractor/Loader/Backhoe 1 8 84 0.37 n/a
Skid Steer Loader Skid Steer 1 8 71 0.37
1 Based on 10,000 gallons per acre disturbed and a 4,000 gallon water truck. 2005, June 5. Maricopa Air Quality Department. Guidance for Application for Dust 2 Represents onsite water truck travel distance and based on 0.825 mi/acre.

Construction Equipment Mix: Left Turn Lane
*Based on information provided by the project applicant.

Equipment CalEEMod Equipment Pieces of Equipment Hrs Op HP LF Worker Trips/
Day
Vendor
Trips/Day
Onsite Truck
Travel Distance
(miles)
Demolition 8 Default
Skid Steer Loader Tractor/Loader/Backhoe 1 8 71 0.37 n/a Site Preparation 8 2
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Skid Steer Loader Skid Steer Loader 1 8 71 0.37
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 0 n/a n/a 0
Rough Grading 8 2
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 0 n/a n/a 0
Fine Grading 8 2
Skip Loader Tractors/Loaders/Backhoes 1 8 84 0.37 n/a
Water truck1 1 n/a n/a 2 n/a
Onsite Truck2 0 n/a n/a 0.00
Asphalt Paving 12 8
Paving Machine Pavers 1 8 n/a
Skip loader Tractor/Loader/Backhoe 1 8 n/a
Roller Rollers 1 8 36 0.38 n/a
Architectural Coating Default Default
Air Compressors 1 6 37 0.48 n/a
1 Assumes a water truck for purposes of modeling.
2 Assumes no onsite truck due to nature of the improvement.

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION Appendix
May 2026
Appendix B. CalEEMod Outputs

RIVERVIEW MARKET PROJECT AIR QUALITY AND GREENHOUSE GAS EMISSIONS , AND ENERGY TECHNICAL STUDY CITY OF BAKERSFIELD: DEVELOPMENT SERVICES – PLANNING DIVISION Appendix
PlaceWorks
This page intentionally left blank.

LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
1 / 37
LOKH-01_Construction Phase 1 Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Site Preparation (2026) - Unmitigated

3.3. Rough Grading (2026) - Unmitigated

3.5. Fine Grading (2026) - Unmitigated

3.7. Building Construction (2026) - Unmitigated

3.9. Paving (2026) - Unmitigated

3.11. Architectural Coating (2026) - Unmitigated

3.13. Utility Trenching (2026) - Unmitigated
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
2 / 37

3.15. Finishing/Landscaping (2026) - Unmitigated

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
3 / 37

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
4 / 37

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.3. Land Use

8.4. Construction

8.4.1. Construction Phases

8.4.2. Off-Road Equipment

8.4.6. Trips and VMT
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
5 / 37

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name LOKH-01_Construction Phase 1
Construction Start Date 3/16/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.382244024302594, -119.09464262587437
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2817
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.37

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Regional Shopping
Center
245.051 1000sqft 5.63000 245,051 520,808 0.00000 — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
6 / 37
Medical Office 9.12900 1000sqft 0.20957 9,129.00 0.00000 — — — Building
Convenience
Market with Gas
Pumps

40.0000 Pump 0.01000 428.000 0.00000 — — —
Fast Food
Restaurant with
Drive Thru

16.8710 1000sqft 0.38730 16,871.0 0.00000 — — —
Automobile Care
Center

4.10000 1000sqft 0.09412 4,100.00 0.00000 — — —
Unrefrigerated
Warehouse-No Rail

40.0000 1000sqft 0.91827 40,000.0 0.00000 — — —
Parking Lot 1.000000 Space 20.2024 0.00000 0.00000 — — — Other Asphalt
Surfaces
281.691 1000sqft 6.46674 0.00000 0.00000 — — —
Other Non-Asphalt
Surfaces

3.03600 Acre 3.03600 0.00000 0.00000 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 8.83612 8.58577 19.0691 24.3953 0.05470 0.67248 6.02347 6.69595 0.62030 0.83288 1.45318 — 7,290.86 7,290.86 0.22905 0.30638 8.62022 7,388.71 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
7 / 37
Unmit. 34.3954 34.2204 19.2711 22.6372 0.05470 0.67248 6.02347 6.69595 0.62030 0.83288 1.45318 — 7,148.34 7,148.34 0.23831 0.28710 0.19616 7,240.05 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 6.01477 5.89914 4.56944 7.88169 0.01237 0.13737 0.98169 1.11906 0.12715 0.21471 0.34186 — 2,038.02 2,038.02 0.05419 0.12903 1.71464 2,079.54 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.09770 1.07659 0.83392 1.43841 0.00226 0.02507 0.17916 0.20423 0.02320 0.03918 0.06239 — 337.417 337.417 0.00897 0.02136 0.28388 344.291

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 8.83612 8.58577 19.0691 24.3953 0.05470 0.67248 6.02347 6.69595 0.62030 0.83288 1.45318 — 7,290.86 7,290.86 0.22905 0.30638 8.62022 7,388.71 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2026 34.3954 34.2204 19.2711 22.6372 0.05470 0.67248 6.02347 6.69595 0.62030 0.83288 1.45318 — 7,148.34 7,148.34 0.23831 0.28710 0.19616 7,240.05 Average
Daily
— — — — — — — — — — — — — — — — — —
2026 6.01477 5.89914 4.56944 7.88169 0.01237 0.13737 0.98169 1.11906 0.12715 0.21471 0.34186 — 2,038.02 2,038.02 0.05419 0.12903 1.71464 2,079.54 Annual — — — — — — — — — — — — — — — — — —
2026 1.09770 1.07659 0.83392 1.43841 0.00226 0.02507 0.17916 0.20423 0.02320 0.03918 0.06239 — 337.417 337.417 0.00897 0.02136 0.28388 344.291

3. Construction Emissions Details

3.1. Site Preparation (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
8 / 37
Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.12007 0.10089 1.03315 1.90815 0.00268 0.03479 — 0.03479 0.03201 — 0.03201 — 290.363 290.363 0.01178 0.00236 — 291.359 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00098 0.00074 0.01771 0.01209 0.00003 0.00003 0.60722 0.60724 0.00003 0.06062 0.06065 — 3.20039 3.20039 0.00016 0.00050 0.00009 3.35501 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00164 0.00138 0.01415 0.02614 0.00004 0.00048 — 0.00048 0.00044 — 0.00044 — 3.97757 3.97757 0.00016 0.00003 — 3.99122 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00001 0.00001 0.00023 0.00016 <

0.000005
<

0.000005

0.00791 0.00791 <

0.000005

0.00079 0.00079 — 0.04344 0.04344 <

0.000005

0.00001 0.00002 0.04557
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00030 0.00025 0.00258 0.00477 0.00001 0.00009 — 0.00009 0.00008 — 0.00008 — 0.65853 0.65853 0.00003 0.00001 — 0.66079 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
9 / 37
Onsite
truck
<

0.000005
<

0.000005

0.00004 0.00003 <

0.000005
<

0.000005

0.00144 0.00144 <

0.000005

0.00014 0.00014 — 0.00719 0.00719 <

0.000005
<

0.000005
<

0.000005

0.00755
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04686 0.04261 0.03873 0.41159 0.00000 0.00000 0.09360 0.09360 0.00000 0.02194 0.02194 — 89.4493 89.4493 0.00265 0.00398 0.00865 90.7098 Vendor 0.00221 0.00158 0.05993 0.02133 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4680 45.4680 0.00055 0.00653 0.00301 47.4297 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00065 0.00059 0.00048 0.00597 0.00000 0.00000 0.00127 0.00127 0.00000 0.00030 0.00030 — 1.27221 1.27221 0.00003 0.00005 0.00197 1.29124 Vendor 0.00003 0.00002 0.00080 0.00029 <

0.000005

0.00001 0.00017 0.00018 0.00001 0.00005 0.00006 — 0.62240 0.62240 0.00001 0.00009 0.00069 0.64991 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00012 0.00011 0.00009 0.00109 0.00000 0.00000 0.00023 0.00023 0.00000 0.00005 0.00005 — 0.21063 0.21063 0.00001 0.00001 0.00033 0.21378 Vendor 0.00001 <

0.000005

0.00015 0.00005 <

0.000005
<

0.000005

0.00003 0.00003 <

0.000005

0.00001 0.00001 — 0.10304 0.10304 <

0.000005

0.00001 0.00011 0.10760
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.3. Rough Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
10 / 37
Off-Roa 1.79115 1.50506 13.4994 12.9313 0.03767 0.52095 — 0.52095 0.47927 — 0.47927 — 4,078.03 4,078.03 0.16542 0.03308 — 4,092.02 d
Dust
From
Material
Movement
— — — — — — 2.12100 2.12100 — 0.22902 0.22902 — — — — — — — Onsite
truck

0.00117 0.00087 0.02049 0.01207 0.00006 0.00011 2.42886 2.42897 0.00011 0.24247 0.24258 — 7.22723 7.22723 0.00019 0.00116 0.01326 7.59083 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.79115 1.50506 13.4994 12.9313 0.03767 0.52095 — 0.52095 0.47927 — 0.47927 — 4,078.03 4,078.03 0.16542 0.03308 — 4,092.02 Dust
From
Material
Movement
— — — — — — 2.12100 2.12100 — 0.22902 0.22902 — — — — — — — Onsite
truck

0.00106 0.00076 0.02192 0.01244 0.00006 0.00011 2.42886 2.42897 0.00011 0.24247 0.24258 — 7.27794 7.27794 0.00019 0.00116 0.00034 7.62862 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.04907 0.04123 0.36985 0.35428 0.00103 0.01427 — 0.01427 0.01313 — 0.01313 — 111.727 111.727 0.00453 0.00091 — 112.110 Dust
From
Material
Movement
— — — — — — 0.05811 0.05811 — 0.00627 0.00627 — — — — — — — Onsite
truck

0.00003 0.00002 0.00058 0.00033 <

0.000005
<

0.000005

0.06326 0.06327 <

0.000005

0.00632 0.00632 — 0.19859 0.19859 0.00001 0.00003 0.00016 0.20834 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00896 0.00753 0.06750 0.06466 0.00019 0.00260 — 0.00260 0.00240 — 0.00240 — 18.4977 18.4977 0.00075 0.00015 — 18.5611 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
11 / 37
Dust
From
Material
Movement
— — — — — — 0.01061 0.01061 — 0.00115 0.00115 — — — — — — — Onsite
truck

0.00001 <

0.000005

0.00011 0.00006 <

0.000005
<

0.000005

0.01155 0.01155 <

0.000005

0.00115 0.00115 — 0.03288 0.03288 <

0.000005

0.00001 0.00003 0.03449
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08736 0.08117 0.05261 0.94070 0.00000 0.00000 0.15600 0.15600 0.00000 0.03657 0.03657 — 169.699 169.699 0.00309 0.00619 0.55548 172.176 Vendor 0.01193 0.00876 0.28072 0.10266 0.00162 0.00325 0.06182 0.06507 0.00325 0.01708 0.02033 — 227.057 227.057 0.00273 0.03264 0.58087 237.431 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07810 0.07102 0.06455 0.68599 0.00000 0.00000 0.15600 0.15600 0.00000 0.03657 0.03657 — 149.082 149.082 0.00441 0.00663 0.01441 151.183 Vendor 0.01105 0.00788 0.29967 0.10663 0.00162 0.00325 0.06182 0.06507 0.00325 0.01708 0.02033 — 227.340 227.340 0.00273 0.03264 0.01506 237.149 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00218 0.00198 0.00160 0.01989 0.00000 0.00000 0.00422 0.00422 0.00000 0.00099 0.00099 — 4.24071 4.24071 0.00011 0.00018 0.00658 4.30415 Vendor 0.00031 0.00023 0.00802 0.00286 0.00004 0.00009 0.00168 0.00177 0.00009 0.00046 0.00055 — 6.22396 6.22396 0.00007 0.00089 0.00687 6.49915 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00040 0.00036 0.00029 0.00363 0.00000 0.00000 0.00077 0.00077 0.00000 0.00018 0.00018 — 0.70210 0.70210 0.00002 0.00003 0.00109 0.71260 Vendor 0.00006 0.00004 0.00146 0.00052 0.00001 0.00002 0.00031 0.00032 0.00002 0.00008 0.00010 — 1.03045 1.03045 0.00001 0.00015 0.00114 1.07601 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.5. Fine Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
12 / 37
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.63869 0.53667 4.77133 7.45217 0.01061 0.21985 — 0.21985 0.20226 — 0.20226 — 1,148.81 1,148.81 0.04660 0.00932 — 1,152.75 Dust
From
Material
Movement
— — — — — — 0.53025 0.53025 — 0.05725 0.05725 — — — — — — — Onsite
truck

0.00109 0.00085 0.01657 0.01171 0.00003 0.00003 0.60722 0.60724 0.00003 0.06062 0.06065 — 3.14969 3.14969 0.00016 0.00050 0.00332 3.30754 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.02625 0.02206 0.19608 0.30625 0.00044 0.00904 — 0.00904 0.00831 — 0.00831 — 47.2114 47.2114 0.00192 0.00038 — 47.3734 Dust
From
Material
Movement
— — — — — — 0.02179 0.02179 — 0.00235 0.00235 — — — — — — — Onsite
truck

0.00004 0.00003 0.00070 0.00049 <

0.000005
<

0.000005

0.02372 0.02372 <

0.000005

0.00237 0.00237 — 0.13031 0.13031 0.00001 0.00002 0.00006 0.13672 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00479 0.00403 0.03578 0.05589 0.00008 0.00165 — 0.00165 0.00152 — 0.00152 — 7.81638 7.81638 0.00032 0.00006 — 7.84321 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
13 / 37
Dust — — — — — — 0.00398 0.00398 — 0.00043 0.00043 — — — — — — — From
Material
Movement
Onsite
truck

0.00001 0.00001 0.00013 0.00009 <

0.000005
<

0.000005

0.00433 0.00433 <

0.000005

0.00043 0.00043 — 0.02158 0.02158 <

0.000005
<

0.000005

0.00001 0.02264
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05241 0.04870 0.03157 0.56442 0.00000 0.00000 0.09360 0.09360 0.00000 0.02194 0.02194 — 101.819 101.819 0.00185 0.00371 0.33329 103.306 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00196 0.00178 0.00144 0.01790 0.00000 0.00000 0.00380 0.00380 0.00000 0.00089 0.00089 — 3.81663 3.81663 0.00010 0.00016 0.00592 3.87373 Vendor 0.00009 0.00007 0.00241 0.00086 0.00001 0.00003 0.00050 0.00053 0.00003 0.00014 0.00017 — 1.86719 1.86719 0.00002 0.00027 0.00206 1.94974 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00036 0.00033 0.00026 0.00327 0.00000 0.00000 0.00069 0.00069 0.00000 0.00016 0.00016 — 0.63189 0.63189 0.00002 0.00003 0.00098 0.64134 Vendor 0.00002 0.00001 0.00044 0.00016 <

0.000005
<

0.000005

0.00009 0.00010 <

0.000005

0.00003 0.00003 — 0.30913 0.30913 <

0.000005

0.00004 0.00034 0.32280
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.7. Building Construction (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
14 / 37
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent

0.49388 0.41051 3.44822 4.23334 0.00695 0.13136 — 0.13136 0.12086 — 0.12086 — 616.241 616.241 0.02500 0.00500 — 618.356 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.49388 0.41051 3.44822 4.23334 0.00695 0.13136 — 0.13136 0.12086 — 0.12086 — 616.241 616.241 0.02500 0.00500 — 618.356 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.26521 0.22044 1.85164 2.27325 0.00373 0.07054 — 0.07054 0.06490 — 0.06490 — 330.913 330.913 0.01342 0.00268 — 332.049 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.04840 0.04023 0.33793 0.41487 0.00068 0.01287 — 0.01287 0.01184 — 0.01184 — 54.7864 54.7864 0.00222 0.00044 — 54.9744 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
15 / 37
Worker 0.52414 0.48699 0.31567 5.64422 0.00000 0.00000 0.93602 0.93602 0.00000 0.21940 0.21940 — 1,018.19 1,018.19 0.01852 0.03714 3.33291 1,033.06 Vendor 0.06170 0.04532 1.45199 0.53099 0.00840 0.01681 0.31976 0.33657 0.01681 0.08834 0.10515 — 1,174.42 1,174.42 0.01411 0.16880 3.00445 1,228.07 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.46858 0.42614 0.38731 4.11594 0.00000 0.00000 0.93602 0.93602 0.00000 0.21940 0.21940 — 894.493 894.493 0.02646 0.03979 0.08646 907.098 Vendor 0.05714 0.04075 1.55001 0.55152 0.00840 0.01681 0.31976 0.33657 0.01681 0.08834 0.10515 — 1,175.88 1,175.88 0.01411 0.16880 0.07788 1,226.61 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.25588 0.23310 0.18803 2.33903 0.00000 0.00000 0.49682 0.49682 0.00000 0.11636 0.11636 — 498.707 498.707 0.01279 0.02137 0.77375 506.167 Vendor 0.03130 0.02311 0.81351 0.29004 0.00451 0.00903 0.17003 0.17906 0.00903 0.04702 0.05605 — 630.972 630.972 0.00757 0.09064 0.69697 658.869 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.04670 0.04254 0.03432 0.42687 0.00000 0.00000 0.09067 0.09067 0.00000 0.02124 0.02124 — 82.5666 82.5666 0.00212 0.00354 0.12810 83.8018 Vendor 0.00571 0.00422 0.14847 0.05293 0.00082 0.00165 0.03103 0.03268 0.00165 0.00858 0.01023 — 104.465 104.465 0.00125 0.01501 0.11539 109.083 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.9. Paving (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.60069 0.50475 4.29709 5.94175 0.00821 0.18647 — 0.18647 0.17155 — 0.17155 — 889.064 889.064 0.03606 0.00721 — 892.115 Paving 6.98731 6.98731 — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
16 / 37
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01646 0.01383 0.11773 0.16279 0.00022 0.00511 — 0.00511 0.00470 — 0.00470 — 24.3579 24.3579 0.00099 0.00020 — 24.4415 Paving 0.19143 0.19143 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00300 0.00252 0.02149 0.02971 0.00004 0.00093 — 0.00093 0.00086 — 0.00086 — 4.03273 4.03273 0.00016 0.00003 — 4.04657 Paving 0.03494 0.03494 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.13977 0.12986 0.08418 1.50513 0.00000 0.00000 0.24961 0.24961 0.00000 0.05851 0.05851 — 271.518 271.518 0.00494 0.00990 0.88878 275.482 Vendor 0.02863 0.02103 0.67373 0.24639 0.00390 0.00780 0.14837 0.15617 0.00780 0.04099 0.04879 — 544.936 544.936 0.00655 0.07832 1.39408 569.835 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00348 0.00317 0.00256 0.03182 0.00000 0.00000 0.00676 0.00676 0.00000 0.00158 0.00158 — 6.78513 6.78513 0.00017 0.00029 0.01053 6.88663 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
17 / 37
Vendor 0.00074 0.00055 0.01926 0.00687 0.00011 0.00021 0.00403 0.00424 0.00021 0.00111 0.00133 — 14.9375 14.9375 0.00018 0.00215 0.01650 15.5979 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00064 0.00058 0.00047 0.00581 0.00000 0.00000 0.00123 0.00123 0.00000 0.00029 0.00029 — 1.12336 1.12336 0.00003 0.00005 0.00174 1.14016 Vendor 0.00014 0.00010 0.00351 0.00125 0.00002 0.00004 0.00073 0.00077 0.00004 0.00020 0.00024 — 2.47307 2.47307 0.00003 0.00036 0.00273 2.58242 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.11. Architectural Coating (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.14557 0.12031 0.85645 1.13283 0.00173 0.02315 — 0.02315 0.02130 — 0.02130 — 133.504 133.504 0.00542 0.00108 — 133.963 Architect
ural
Coating
s

33.1469 33.1469 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.02194 0.01813 0.12905 0.17070 0.00026 0.00349 — 0.00349 0.00321 — 0.00321 — 20.1171 20.1171 0.00082 0.00016 — 20.1862 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
18 / 37
Architect 4.99475 4.99475 — — — — — — — — — — — — — — — — ural
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00400 0.00331 0.02355 0.03115 0.00005 0.00064 — 0.00064 0.00059 — 0.00059 — 3.33062 3.33062 0.00014 0.00003 — 3.34205 Architect
ural
Coating
s

0.91154 0.91154 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08331 0.07576 0.06886 0.73176 0.00000 0.00000 0.16641 0.16641 0.00000 0.03901 0.03901 — 159.029 159.029 0.00470 0.00707 0.01537 161.270 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01277 0.01163 0.00938 0.11669 0.00000 0.00000 0.02479 0.02479 0.00000 0.00581 0.00581 — 24.8801 24.8801 0.00064 0.00107 0.03860 25.2523 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00233 0.00212 0.00171 0.02130 0.00000 0.00000 0.00452 0.00452 0.00000 0.00106 0.00106 — 4.11919 4.11919 0.00011 0.00018 0.00639 4.18081 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
19 / 37

3.13. Utility Trenching (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.46593 0.39151 3.71028 5.85304 0.00798 0.11716 — 0.11716 0.10778 — 0.10778 — 863.995 863.995 0.03505 0.00701 — 866.960 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.05744 0.04827 0.45743 0.72161 0.00098 0.01444 — 0.01444 0.01329 — 0.01329 — 106.520 106.520 0.00432 0.00086 — 106.885 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01048 0.00881 0.08348 0.13169 0.00018 0.00264 — 0.00264 0.00243 — 0.00243 — 17.6356 17.6356 0.00072 0.00014 — 17.6961 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
20 / 37
Worker 0.15724 0.14610 0.09470 1.69327 0.00000 0.00000 0.28081 0.28081 0.00000 0.06582 0.06582 — 305.458 305.458 0.00556 0.01114 0.99987 309.917 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01762 0.01606 0.01295 0.16111 0.00000 0.00000 0.03422 0.03422 0.00000 0.00801 0.00801 — 34.3497 34.3497 0.00088 0.00147 0.05329 34.8636 Vendor 0.00028 0.00021 0.00722 0.00257 0.00004 0.00008 0.00151 0.00159 0.00008 0.00042 0.00050 — 5.60156 5.60156 0.00007 0.00080 0.00619 5.84923 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00322 0.00293 0.00236 0.02940 0.00000 0.00000 0.00625 0.00625 0.00000 0.00146 0.00146 — 5.68699 5.68699 0.00015 0.00024 0.00882 5.77206 Vendor 0.00005 0.00004 0.00132 0.00047 0.00001 0.00001 0.00028 0.00029 0.00001 0.00008 0.00009 — 0.92740 0.92740 0.00001 0.00013 0.00102 0.96841 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.15. Finishing/Landscaping (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.19385 0.16289 1.87048 3.41140 0.00494 0.05862 — 0.05862 0.05393 — 0.05393 — 535.285 535.285 0.02171 0.00434 — 537.122 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
21 / 37
Off-Roa
Equipment

0.19385 0.16289 1.87048 3.41140 0.00494 0.05862 — 0.05862 0.05393 — 0.05393 — 535.285 535.285 0.02171 0.00434 — 537.122 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.03452 0.02901 0.33310 0.60751 0.00088 0.01044 — 0.01044 0.00960 — 0.00960 — 95.3248 95.3248 0.00387 0.00077 — 95.6519 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00630 0.00529 0.06079 0.11087 0.00016 0.00191 — 0.00191 0.00175 — 0.00175 — 15.7821 15.7821 0.00064 0.00013 — 15.8363 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.17471 0.16233 0.10522 1.88141 0.00000 0.00000 0.31201 0.31201 0.00000 0.07313 0.07313 — 339.397 339.397 0.00617 0.01238 1.11097 344.352 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.15619 0.14205 0.12910 1.37198 0.00000 0.00000 0.31201 0.31201 0.00000 0.07313 0.07313 — 298.164 298.164 0.00882 0.01326 0.02882 302.366 Vendor 0.00221 0.00158 0.05993 0.02133 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4680 45.4680 0.00055 0.00653 0.00301 47.4297 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
22 / 37
Worker 0.02829 0.02577 0.02079 0.25857 0.00000 0.00000 0.05492 0.05492 0.00000 0.01286 0.01286 — 55.1292 55.1292 0.00141 0.00236 0.08553 55.9539 Vendor 0.00040 0.00030 0.01043 0.00372 0.00006 0.00012 0.00218 0.00230 0.00012 0.00060 0.00072 — 8.09115 8.09115 0.00010 0.00116 0.00894 8.44889 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00516 0.00470 0.00379 0.04719 0.00000 0.00000 0.01002 0.01002 0.00000 0.00235 0.00235 — 9.12726 9.12726 0.00023 0.00039 0.01416 9.26380 Vendor 0.00007 0.00005 0.00190 0.00068 0.00001 0.00002 0.00040 0.00042 0.00002 0.00011 0.00013 — 1.33958 1.33958 0.00002 0.00019 0.00148 1.39881 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
23 / 37
Land TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Use
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
24 / 37
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 3/16/2026 3/20/2026 5.00000 5.00000 — Rough Grading Grading 3/23/2026 4/3/2026 5.00000 10.00000 — Fine Grading Grading 06/08/2026 6/26/2026 5.00000 15.0000 — Building Construction Building Construction 3/30/2026 12/28/2026 5.00000 196.000 — Paving Paving 06/29/2026 7/10/2026 5.00000 10.00000 —
Architectural Coating Architectural Coating 10/13/2026 12/28/2026 5.00000 55.0000 — LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
25 / 37
Utility Trenching Trenching 04/06/2026 6/5/2026 5.00000 45.0000 — Finishing/Landscaping Trenching 07/13/2026 10/9/2026 5.00000 65.0000 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Rough Grading Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Rough Grading Scrapers Diesel Average 2.00000 8.00000 423.000 0.48000 Fine Grading Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Fine Grading Tractors/Loaders/Back
hoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Building Construction Forklifts Diesel Average 2.00000 8.00000 82.0000 0.20000 Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000 Paving Pavers Diesel Average 1.000000 8.00000 81.0000 0.42000 Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000 Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000 Utility Trenching Tractors/Loaders/Back
hoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Utility Trenching Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000 Finishing/Landscaping Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Finishing/Landscaping Skid Steer Loaders Diesel Average 1.000000 8.00000 71.0000 0.37000 LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
26 / 37

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation Worker 12.0000 11.0400 LDA,LDT1,LDT2
Site Preparation Vendor 2.00000 7.37000 HHDT,MHDT
Site Preparation Hauling 0.00000 20.0000 HHDT
Site Preparation Onsite truck 1.000000 0.41250 HHDT
Rough Grading Worker 20.0000 11.0400 LDA,LDT1,LDT2
Rough Grading Vendor 10.00000 7.37000 HHDT,MHDT
Rough Grading Hauling 0.00000 20.0000 HHDT
Rough Grading Onsite truck 1.000000 1.65000 HHDT
Fine Grading Worker 12.0000 11.0400 LDA,LDT1,LDT2
Fine Grading Vendor 2.00000 7.37000 HHDT,MHDT
Fine Grading Hauling 0.00000 20.0000 HHDT
Fine Grading Onsite truck 1.000000 0.41250 HHDT
Building Construction Worker 120.000 11.0400 LDA,LDT1,LDT2 Building Construction Vendor 51.7234 7.37000 HHDT,MHDT
Building Construction Hauling 0.00000 20.0000 HHDT
Building Construction Onsite truck — — HHDT
Paving Worker 32.0000 11.0400 LDA,LDT1,LDT2
Paving Vendor 24.0000 7.37000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 21.3345 11.0400 LDA,LDT1,LDT2 Architectural Coating Vendor — 7.37000 HHDT,MHDT
Architectural Coating Hauling 0.00000 20.0000 HHDT
Architectural Coating Onsite truck — — HHDT
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
27 / 37
Utility Trenching Worker 36.0000 11.0400 LDA,LDT1,LDT2
Utility Trenching Vendor 2.00000 7.37000 HHDT,MHDT
Utility Trenching Hauling 0.00000 20.0000 HHDT
Utility Trenching Onsite truck — — HHDT
Finishing/Landscaping Worker 40.0000 11.0400 LDA,LDT1,LDT2 Finishing/Landscaping Vendor 2.00000 7.37000 HHDT,MHDT
Finishing/Landscaping Hauling 0.00000 20.0000 HHDT
Finishing/Landscaping Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 473,369 157,790 77,637.3

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Site Preparation — — 0.00000 0.00000 0.00000
Rough Grading — — 20.0000 0.00000 0.00000
Fine Grading — — 7.50000 0.00000 0.00000
Paving 0.00000 0.00000 0.00000 0.00000 29.7051

5.6.2. Construction Earthmoving Control Strategies
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
28 / 37
Non-applicable. No control strategies activated by user.

5.7. Construction Paving
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Regional Shopping Center 0.00000 0%
Paving Medical Office Building 0.00000 0%
Paving Convenience Market with Gas Pumps 0.00000 0%
Paving Fast Food Restaurant with Drive Thru 0.00000 0%
Paving Automobile Care Center 0.00000 0%
Paving Unrefrigerated Warehouse-No Rail 0.00000 0%
Paving Parking Lot 20.2024 100%
Paving Other Asphalt Surfaces 6.46674 100%
Paving Other Non-Asphalt Surfaces 3.03600 0%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 203.983 0.03300 0.00400

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
29 / 37
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 20.0600 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.00000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
30 / 37
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 0 0 0 N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 1 1 1 2
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
31 / 37

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6279
AQ-PM 99.3155
AQ-DPM 54.8102
Drinking Water 72.9986
Lead Risk Housing 7.14556
Pesticides 0.00000
Toxic Releases 39.1223
Traffic 67.1875
Effect Indicators —
CleanUp Sites 27.4916
Groundwater 59.6048
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 21.0867
Cardio-vascular 30.7951
Low Birth Weights 28.0729
Socioeconomic Factor Indicators —
Education 29.6760
Housing 15.5006
Linguistic 21.4237
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
32 / 37
Poverty 22.0101
Unemployment 67.4779

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 74.07930194
Employed 65.05838573
Median HI 66.79070961
Education —
Bachelor's or higher 57.08969588
High school enrollment 100
Preschool enrollment 17.9006801
Transportation —
Auto Access 52.9449506
Active commuting 56.70473502
Social —
2-parent households 19.17105094
Voting 67.22699859
Neighborhood —
Alcohol availability 71.87219299
Park access 52.55998973
Retail density 27.37071731
Supermarket access 19.78698832
Tree canopy 9.187732581
Housing —
Homeownership 39.93327345
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
33 / 37
Housing habitability 84.98652637
Low-inc homeowner severe housing cost burden 93.301681
Low-inc renter severe housing cost burden 84.08828436
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 92.01847812
Arthritis 31.2
Asthma ER Admissions 73.6
High Blood Pressure 29.0
Cancer (excluding skin) 16.1
Asthma 51.9
Coronary Heart Disease 37.1
Chronic Obstructive Pulmonary Disease 50.7
Diagnosed Diabetes 80.8
Life Expectancy at Birth 53.0
Cognitively Disabled 66.4
Physically Disabled 26.6
Heart Attack ER Admissions 46.6
Mental Health Not Good 60.0
Chronic Kidney Disease 45.1
Obesity 52.4
Pedestrian Injuries 74.9
Physical Health Not Good 65.0
Stroke 45.2
Health Risk Behaviors —
Binge Drinking 11.3
Current Smoker 53.5
No Leisure Time for Physical Activity 58.6
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
34 / 37
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 53.3
Elderly 40.9
English Speaking 76.1
Foreign-born 16.0
Outdoor Workers 46.6
Climate Change Adaptive Capacity —
Impervious Surface Cover 59.7
Traffic Density 56.7
Traffic Access 0.0
Other Indices —
Hardship 35.5
Other Decision Support —
2016 Voting 53.7

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 30.0000 Healthy Places Index Score for Project Location (b) 57.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
35 / 37
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data

8.1. Justifications
Screen Justification
Land Use Based on information provided.

Construction: Construction Phases Based on information provided by the project applicant. See the appendix for further details.

Construction: Off-Road Equipment Based on information provided by the project applicant. See appendix for further details.

Construction: Trips and VMT Based on information provided by the project applicant. See appendix for further details.

Operations: Vehicle Data Based on information provided by the project traffic consultant.

Operations: Fleet Mix Based on information provided by the traffic consultant.

Operations: Energy Use The estimated 935,329 kWh/yr of renewable electricity generated from onsite PV system for Phase 1 is subtracted from the Title 24 electricity default total.

Operations: Water and Waste Water Based on the full buildout demand from the Water Supply and Demand Analysis Coffee and Rosedale Commercial Retail Development Project study prepared by PlaceWorks.

8.3. Land Use
Model Parameter Units Default Value New Value
Lot Area acre 5.62560 5.63000
Landscape Area sq. ft — 520,808
Special Landscape Area sq. ft — 0.00000
Lot Area acre 0.12964 0.01000
Building Area sq. ft 5,647.00 428.000
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
36 / 37
Landscape Area sq. ft — 0.00000
Lot Area acre 0.00900 20.2024
Landscape Area sq. ft — 0.00000

8.4. Construction

8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Site Preparation Site Preparation Start Date 5/26/2026 3/16/2026 Site Preparation Site Preparation End Date 7/7/2026 3/20/2026 Site Preparation Site Preparation Work Days per Phase 30.0000 5.00000 Building Construction Building Construction Start Date 10/22/2026 3/30/2026 Building Construction Building Construction End Date 8/23/2029 12/28/2026 Building Construction Building Construction Work Days per Phase 740.000 196.000 Paving Paving Start Date 8/24/2029 06/29/2026
Paving Paving End Date 11/9/2029 7/10/2026
Paving Paving Work Days per Phase 55.0000 10.00000
Architectural Coating Architectural Coating Start Date 11/10/2029 10/13/2026 Architectural Coating Architectural Coating End Date 1/26/2030 12/28/2026

8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Site Preparation Tractors/Loaders/Backhoes Number per Day 4.00000 1.000000 Rough Grading Tractors/Loaders/Backhoes Number per Day 2.00000 1.000000 Building Construction Forklifts Number per Day 3.00000 2.00000 Paving Pavers Number per Day 2.00000 1.000000
LOKH-01_Construction Phase 1 Detailed Report, 2/9/2026
37 / 37

8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Site Preparation Worker One-Way Trips per Day 2.50000 12.0000 Rough Grading Worker One-Way Trips per Day 7.50000 20.0000 Fine Grading Worker One-Way Trips per Day 7.50000 12.0000 Building Construction Worker One-Way Trips per Day 106.672 120.000 Paving Worker One-Way Trips per Day 10.00000 32.0000
Utility Trenching Worker One-Way Trips per Day 10.00000 36.0000 Finishing/Landscaping Worker One-Way Trips per Day 5.00000 40.0000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
1 / 36
LOKH-01_Construction Phase 2 Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Site Preparation (2027) - Unmitigated

3.3. Rough Grading (2027) - Unmitigated

3.5. Fine Grading (2027) - Unmitigated

3.7. Building Construction (2027) - Unmitigated

3.9. Paving (2027) - Unmitigated

3.11. Architectural Coating (2027) - Unmitigated

3.13. Utility Trenching (2027) - Unmitigated
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
2 / 36

3.15. Finishing & Landscaping (2027) - Unmitigated

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
3 / 36

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
4 / 36

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.3. Land Use

8.4. Construction

8.4.1. Construction Phases

8.4.2. Off-Road Equipment

8.4.6. Trips and VMT
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
5 / 36

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name LOKH-01_Construction Phase 2
Construction Start Date 1/4/2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.382244024302594, -119.09464262587437
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2817
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.37

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Regional Shopping
Center

89.9520 1000sqft 1.77000 89,952.0 81,183.0 0.00000 — —
Parking Lot 371.000 Space 4.94850 0.00000 0.00000 — — — LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
6 / 36
Other Asphalt
Surfaces
108.717 1000sqft 2.49580 0.00000 0.00000 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 26.4736 26.3580 5.90608 14.2941 0.01461 0.17052 1.27353 1.44406 0.15732 0.30285 0.46017 — 2,770.14 2,770.14 0.07442 0.11041 4.60945 2,809.51 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.51561 5.31693 16.9627 21.7082 0.04868 0.60541 5.79485 6.40027 0.55763 0.76972 1.32735 — 6,272.93 6,272.93 0.22509 0.16637 0.13983 6,328.26 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.92392 1.86845 2.48291 4.68031 0.00608 0.07706 0.58631 0.66337 0.07106 0.11810 0.18916 — 1,015.76 1,015.76 0.03062 0.04028 0.68339 1,029.22 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.35112 0.34099 0.45313 0.85416 0.00111 0.01406 0.10700 0.12106 0.01297 0.02155 0.03452 — 168.171 168.171 0.00507 0.00667 0.11314 170.399

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
7 / 36
Daily - — — — — — — — — — — — — — — — — — —
Summer
(Max)
2027 26.4736 26.3580 5.90608 14.2941 0.01461 0.17052 1.27353 1.44406 0.15732 0.30285 0.46017 — 2,770.14 2,770.14 0.07442 0.11041 4.60945 2,809.51 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2027 5.51561 5.31693 16.9627 21.7082 0.04868 0.60541 5.79485 6.40027 0.55763 0.76972 1.32735 — 6,272.93 6,272.93 0.22509 0.16637 0.13983 6,328.26 Average
Daily
— — — — — — — — — — — — — — — — — —
2027 1.92392 1.86845 2.48291 4.68031 0.00608 0.07706 0.58631 0.66337 0.07106 0.11810 0.18916 — 1,015.76 1,015.76 0.03062 0.04028 0.68339 1,029.22 Annual — — — — — — — — — — — — — — — — — —
2027 0.35112 0.34099 0.45313 0.85416 0.00111 0.01406 0.10700 0.12106 0.01297 0.02155 0.03452 — 168.171 168.171 0.00507 0.00667 0.11314 170.399

3. Construction Emissions Details

3.1. Site Preparation (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.11557 0.09711 0.99074 1.91149 0.00268 0.02982 — 0.02982 0.02744 — 0.02744 — 290.314 290.314 0.01178 0.00236 — 291.310 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
8 / 36
Onsite
truck

0.00095 0.00074 0.01759 0.01206 0.00003 0.00003 0.60722 0.60724 0.00003 0.06062 0.06065 — 3.13319 3.13319 0.00016 0.00050 0.00008 3.28509 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00158 0.00133 0.01357 0.02618 0.00004 0.00041 — 0.00041 0.00038 — 0.00038 — 3.97690 3.97690 0.00016 0.00003 — 3.99055 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00001 0.00001 0.00023 0.00016 <

0.000005
<

0.000005

0.00791 0.00791 <

0.000005

0.00079 0.00079 — 0.04252 0.04252 <

0.000005

0.00001 0.00002 0.04462
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00029 0.00024 0.00248 0.00478 0.00001 0.00007 — 0.00007 0.00007 — 0.00007 — 0.65842 0.65842 0.00003 0.00001 — 0.66068 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck
<

0.000005
<

0.000005

0.00004 0.00003 <

0.000005
<

0.000005

0.00144 0.00144 <

0.000005

0.00014 0.00014 — 0.00704 0.00704 <

0.000005
<

0.000005
<

0.000005

0.00739
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04182 0.04050 0.03528 0.37844 0.00000 0.00000 0.09360 0.09360 0.00000 0.02194 0.02194 — 87.6660 87.6660 0.00238 0.00398 0.00777 88.9190 Vendor 0.00221 0.00158 0.05781 0.02054 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 44.4498 44.4498 0.00055 0.00653 0.00270 46.4111 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
9 / 36
Average — — — — — — — — — — — — — — — — — —
Daily
Worker 0.00058 0.00056 0.00043 0.00550 0.00000 0.00000 0.00127 0.00127 0.00000 0.00030 0.00030 — 1.24680 1.24680 0.00003 0.00005 0.00177 1.26445 Vendor 0.00003 0.00002 0.00077 0.00028 <

0.000005

0.00001 0.00017 0.00018 0.00001 0.00005 0.00006 — 0.60845 0.60845 0.00001 0.00009 0.00061 0.63590 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00011 0.00010 0.00008 0.00100 0.00000 0.00000 0.00023 0.00023 0.00000 0.00005 0.00005 — 0.20642 0.20642 <

0.000005

0.00001 0.00029 0.20934
Vendor 0.00001 <

0.000005

0.00014 0.00005 <

0.000005
<

0.000005

0.00003 0.00003 <

0.000005

0.00001 0.00001 — 0.10074 0.10074 <

0.000005

0.00001 0.00010 0.10528
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.3. Rough Grading (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.73998 1.46207 12.5171 12.8130 0.03766 0.48362 — 0.48362 0.44493 — 0.44493 — 4,076.91 4,076.91 0.16538 0.03308 — 4,090.90 Dust
From
Material
Movement
— — — — — — 2.12100 2.12100 — 0.22902 0.22902 — — — — — — — Onsite
truck

0.00104 0.00076 0.02168 0.01239 0.00006 0.00011 2.42886 2.42897 0.00011 0.24247 0.24258 — 7.11639 7.11639 0.00019 0.00112 0.00032 7.45621 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
10 / 36
Average — — — — — — — — — — — — — — — — — —
Daily
Off-Roa
d
Equipm
ent

0.04767 0.04006 0.34293 0.35104 0.00103 0.01325 — 0.01325 0.01219 — 0.01219 — 111.696 111.696 0.00453 0.00091 — 112.080 Dust
From
Material
Movement
— — — — — — 0.05811 0.05811 — 0.00627 0.00627 — — — — — — — Onsite
truck

0.00003 0.00002 0.00057 0.00033 <

0.000005
<

0.000005

0.06326 0.06327 <

0.000005

0.00632 0.00632 — 0.19417 0.19417 0.00001 0.00003 0.00015 0.20362 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00870 0.00731 0.06259 0.06406 0.00019 0.00242 — 0.00242 0.00222 — 0.00222 — 18.4926 18.4926 0.00075 0.00015 — 18.5560 Dust
From
Material
Movement
— — — — — — 0.01061 0.01061 — 0.00115 0.00115 — — — — — — — Onsite
truck

0.00001 <

0.000005

0.00010 0.00006 <

0.000005
<

0.000005

0.01155 0.01155 <

0.000005

0.00115 0.00115 — 0.03215 0.03215 <

0.000005

0.00001 0.00002 0.03371
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06970 0.06750 0.05880 0.63073 0.00000 0.00000 0.15600 0.15600 0.00000 0.03657 0.03657 — 146.110 146.110 0.00397 0.00663 0.01295 148.198 Vendor 0.01105 0.00788 0.28904 0.10272 0.00162 0.00325 0.06182 0.06507 0.00325 0.01708 0.02033 — 222.249 222.249 0.00273 0.03264 0.01348 232.056 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00192 0.00187 0.00144 0.01834 0.00000 0.00000 0.00422 0.00422 0.00000 0.00099 0.00099 — 4.15599 4.15599 0.00010 0.00017 0.00589 4.21484 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
11 / 36
Vendor 0.00031 0.00023 0.00773 0.00275 0.00004 0.00009 0.00168 0.00177 0.00009 0.00046 0.00055 — 6.08449 6.08449 0.00007 0.00089 0.00615 6.35895 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00035 0.00034 0.00026 0.00335 0.00000 0.00000 0.00077 0.00077 0.00000 0.00018 0.00018 — 0.68807 0.68807 0.00002 0.00003 0.00098 0.69782 Vendor 0.00006 0.00004 0.00141 0.00050 0.00001 0.00002 0.00031 0.00032 0.00002 0.00008 0.00010 — 1.00736 1.00736 0.00001 0.00015 0.00102 1.05280 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.5. Fine Grading (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.60731 0.51031 4.42585 7.46774 0.01061 0.19561 — 0.19561 0.17996 — 0.17996 — 1,149.18 1,149.18 0.04662 0.00932 — 1,153.13 Dust
From
Material
Movement
— — — — — — 0.53025 0.53025 — 0.05725 0.05725 — — — — — — — Onsite
truck

0.00095 0.00074 0.01759 0.01206 0.00003 0.00003 0.60722 0.60724 0.00003 0.06062 0.06065 — 3.13319 3.13319 0.00016 0.00050 0.00008 3.28509 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01664 0.01398 0.12126 0.20460 0.00029 0.00536 — 0.00536 0.00493 — 0.00493 — 31.4844 31.4844 0.00128 0.00026 — 31.5925 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
12 / 36
Dust — — — — — — 0.01453 0.01453 — 0.00157 0.00157 — — — — — — — From
Material
Movement
Onsite
truck

0.00003 0.00002 0.00046 0.00032 <

0.000005
<

0.000005

0.01582 0.01582 <

0.000005

0.00158 0.00158 — 0.08504 0.08504 <

0.000005

0.00001 0.00004 0.08924
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00304 0.00255 0.02213 0.03734 0.00005 0.00098 — 0.00098 0.00090 — 0.00090 — 5.21261 5.21261 0.00021 0.00004 — 5.23049 Dust
From
Material
Movement
— — — — — — 0.00265 0.00265 — 0.00029 0.00029 — — — — — — — Onsite
truck

0.00001 <

0.000005

0.00008 0.00006 <

0.000005
<

0.000005

0.00289 0.00289 <

0.000005

0.00029 0.00029 — 0.01408 0.01408 <

0.000005
<

0.000005

0.00001 0.01477
Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03485 0.03375 0.02940 0.31537 0.00000 0.00000 0.07800 0.07800 0.00000 0.01828 0.01828 — 73.0550 73.0550 0.00198 0.00332 0.00647 74.0992 Vendor 0.00221 0.00158 0.05781 0.02054 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 44.4498 44.4498 0.00055 0.00653 0.00270 46.4111 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00096 0.00094 0.00072 0.00917 0.00000 0.00000 0.00211 0.00211 0.00000 0.00049 0.00049 — 2.07800 2.07800 0.00005 0.00008 0.00295 2.10742 Vendor 0.00006 0.00005 0.00155 0.00055 0.00001 0.00002 0.00034 0.00035 0.00002 0.00009 0.00011 — 1.21690 1.21690 0.00001 0.00018 0.00123 1.27179 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00018 0.00017 0.00013 0.00167 0.00000 0.00000 0.00039 0.00039 0.00000 0.00009 0.00009 — 0.34404 0.34404 0.00001 0.00001 0.00049 0.34891 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
13 / 36
Vendor 0.00001 0.00001 0.00028 0.00010 <

0.000005
<

0.000005

0.00006 0.00006 <

0.000005

0.00002 0.00002 — 0.20147 0.20147 <

0.000005

0.00003 0.00020 0.21056
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.7. Building Construction (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.46827 0.38917 3.29710 4.21359 0.00695 0.11365 — 0.11365 0.10456 — 0.10456 — 616.224 616.224 0.02500 0.00500 — 618.338 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.46827 0.38917 3.29710 4.21359 0.00695 0.11365 — 0.11365 0.10456 — 0.10456 — 616.224 616.224 0.02500 0.00500 — 618.338 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.17319 0.14394 1.21948 1.55845 0.00257 0.04203 — 0.04203 0.03867 — 0.03867 — 227.918 227.918 0.00925 0.00185 — 228.700 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
14 / 36
Off-Roa
Equipment

0.03161 0.02627 0.22255 0.28442 0.00047 0.00767 — 0.00767 0.00706 — 0.00706 — 37.7345 37.7345 0.00153 0.00031 — 37.8640 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.46583 0.45789 0.28117 5.20104 0.00000 0.00000 0.93602 0.93602 0.00000 0.21940 0.21940 — 997.619 997.619 0.01852 0.03714 2.99043 1,012.14 Vendor 0.01726 0.01292 0.40027 0.14526 0.00240 0.00479 0.09114 0.09593 0.00479 0.02518 0.02997 — 327.244 327.244 0.00402 0.04811 0.76732 342.450 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.41821 0.40498 0.35281 3.78440 0.00000 0.00000 0.93602 0.93602 0.00000 0.21940 0.21940 — 876.660 876.660 0.02381 0.03979 0.07768 889.190 Vendor 0.01629 0.01162 0.42614 0.15144 0.00240 0.00479 0.09114 0.09593 0.00479 0.02518 0.02997 — 327.664 327.664 0.00402 0.04811 0.01987 342.123 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.15566 0.15174 0.11675 1.48547 0.00000 0.00000 0.34220 0.34220 0.00000 0.08015 0.08015 — 336.635 336.635 0.00783 0.01374 0.47733 341.402 Vendor 0.00614 0.00454 0.15392 0.05481 0.00089 0.00177 0.03338 0.03515 0.00177 0.00923 0.01100 — 121.101 121.101 0.00149 0.01780 0.12239 126.564 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.02841 0.02769 0.02131 0.27110 0.00000 0.00000 0.06245 0.06245 0.00000 0.01463 0.01463 — 55.7338 55.7338 0.00130 0.00227 0.07903 56.5230 Vendor 0.00112 0.00083 0.02809 0.01000 0.00016 0.00032 0.00609 0.00642 0.00032 0.00168 0.00201 — 20.0497 20.0497 0.00025 0.00295 0.02026 20.9541 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.9. Paving (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
15 / 36
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.58283 0.48974 4.18675 5.95548 0.00821 0.17194 — 0.17194 0.15818 — 0.15818 — 889.119 889.119 0.03607 0.00721 — 892.171 Paving 3.90081 3.90081 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00798 0.00671 0.05735 0.08158 0.00011 0.00236 — 0.00236 0.00217 — 0.00217 — 12.1797 12.1797 0.00049 0.00010 — 12.2215 Paving 0.05344 0.05344 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00146 0.00122 0.01047 0.01489 0.00002 0.00043 — 0.00043 0.00040 — 0.00040 — 2.01649 2.01649 0.00008 0.00002 — 2.02341 Paving 0.00975 0.00975 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
16 / 36
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Worker 0.11152 0.10799 0.09408 1.00917 0.00000 0.00000 0.24961 0.24961 0.00000 0.05851 0.05851 — 233.776 233.776 0.00635 0.01061 0.02072 237.117 Vendor 0.01768 0.01261 0.46247 0.16435 0.00260 0.00520 0.09891 0.10411 0.00520 0.02733 0.03253 — 355.598 355.598 0.00436 0.05222 0.02156 371.289 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00154 0.00150 0.00115 0.01467 0.00000 0.00000 0.00338 0.00338 0.00000 0.00079 0.00079 — 3.32479 3.32479 0.00008 0.00014 0.00471 3.37187 Vendor 0.00025 0.00018 0.00619 0.00220 0.00004 0.00007 0.00134 0.00141 0.00007 0.00037 0.00044 — 4.86759 4.86759 0.00006 0.00072 0.00492 5.08716 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00028 0.00027 0.00021 0.00268 0.00000 0.00000 0.00062 0.00062 0.00000 0.00014 0.00014 — 0.55046 0.55046 0.00001 0.00002 0.00078 0.55825 Vendor 0.00005 0.00003 0.00113 0.00040 0.00001 0.00001 0.00024 0.00026 0.00001 0.00007 0.00008 — 0.80589 0.80589 0.00001 0.00012 0.00081 0.84224 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.11. Architectural Coating (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.13715 0.11335 0.83116 1.12539 0.00173 0.01905 — 0.01905 0.01752 — 0.01752 — 133.513 133.513 0.00542 0.00108 — 133.971 Architect
ural
Coating
s

25.3627 25.3627 — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
17 / 36
Onsite 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 truck
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00752 0.00621 0.04554 0.06167 0.00009 0.00104 — 0.00104 0.00096 — 0.00096 — 7.31577 7.31577 0.00030 0.00006 — 7.34087 Architect
ural
Coating
s

1.38974 1.38974 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00137 0.00113 0.00831 0.01125 0.00002 0.00019 — 0.00019 0.00018 — 0.00018 — 1.21121 1.21121 0.00005 0.00001 — 1.21537 Architect
ural
Coating
s

0.25363 0.25363 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.02235 0.02197 0.01349 0.24952 0.00000 0.00000 0.04491 0.04491 0.00000 0.01053 0.01053 — 47.8602 47.8602 0.00089 0.00178 0.14346 48.5569 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
18 / 36
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00111 0.00108 0.00083 0.01056 0.00000 0.00000 0.00243 0.00243 0.00000 0.00057 0.00057 — 2.39257 2.39257 0.00006 0.00010 0.00339 2.42645 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00020 0.00020 0.00015 0.00193 0.00000 0.00000 0.00044 0.00044 0.00000 0.00010 0.00010 — 0.39612 0.39612 0.00001 0.00002 0.00056 0.40173 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.13. Utility Trenching (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.44828 0.37668 3.60621 5.85759 0.00798 0.10249 — 0.10249 0.09429 — 0.09429 — 864.074 864.074 0.03505 0.00701 — 867.039 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
19 / 36
Off-Roa 0.02456 0.02064 0.19760 0.32096 0.00044 0.00562 — 0.00562 0.00517 — 0.00517 — 47.3465 47.3465 0.00192 0.00038 — 47.5090 d
Equipm
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00448 0.00377 0.03606 0.05858 0.00008 0.00102 — 0.00102 0.00094 — 0.00094 — 7.83876 7.83876 0.00032 0.00006 — 7.86566 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.08364 0.08100 0.07056 0.75688 0.00000 0.00000 0.18720 0.18720 0.00000 0.04388 0.04388 — 175.332 175.332 0.00476 0.00796 0.01554 177.838 Vendor 0.00221 0.00158 0.05781 0.02054 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 44.4498 44.4498 0.00055 0.00653 0.00270 46.4111 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00461 0.00450 0.00346 0.04401 0.00000 0.00000 0.01014 0.01014 0.00000 0.00237 0.00237 — 9.97438 9.97438 0.00023 0.00041 0.01414 10.1156 Vendor 0.00012 0.00009 0.00309 0.00110 0.00002 0.00004 0.00067 0.00071 0.00004 0.00019 0.00022 — 2.43380 2.43380 0.00003 0.00036 0.00246 2.54358 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00084 0.00082 0.00063 0.00803 0.00000 0.00000 0.00185 0.00185 0.00000 0.00043 0.00043 — 1.65137 1.65137 0.00004 0.00007 0.00234 1.67476 Vendor 0.00002 0.00002 0.00056 0.00020 <

0.000005

0.00001 0.00012 0.00013 0.00001 0.00003 0.00004 — 0.40294 0.40294 <

0.000005

0.00006 0.00041 0.42112
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
20 / 36

3.15. Finishing & Landscaping (2027) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.18697 0.15710 1.80295 3.41423 0.00494 0.05143 — 0.05143 0.04732 — 0.04732 — 535.252 535.252 0.02171 0.00434 — 537.089 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.18697 0.15710 1.80295 3.41423 0.00494 0.05143 — 0.05143 0.04732 — 0.04732 — 535.252 535.252 0.02171 0.00434 — 537.089 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01793 0.01506 0.17289 0.32739 0.00047 0.00493 — 0.00493 0.00454 — 0.00454 — 51.3256 51.3256 0.00208 0.00042 — 51.5017 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00327 0.00275 0.03155 0.05975 0.00009 0.00090 — 0.00090 0.00083 — 0.00083 — 8.49753 8.49753 0.00034 0.00007 — 8.52670 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
21 / 36
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.11646 0.11447 0.07029 1.30026 0.00000 0.00000 0.23401 0.23401 0.00000 0.05485 0.05485 — 249.405 249.405 0.00463 0.00929 0.74761 253.035 Vendor 0.00234 0.00175 0.05430 0.01971 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 44.3927 44.3927 0.00055 0.00653 0.10409 46.4555 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.10455 0.10125 0.08820 0.94610 0.00000 0.00000 0.23401 0.23401 0.00000 0.05485 0.05485 — 219.165 219.165 0.00595 0.00995 0.01942 222.298 Vendor 0.00221 0.00158 0.05781 0.02054 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 44.4498 44.4498 0.00055 0.00653 0.00270 46.4111 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01009 0.00984 0.00757 0.09628 0.00000 0.00000 0.02218 0.02218 0.00000 0.00519 0.00519 — 21.8190 21.8190 0.00051 0.00089 0.03094 22.1279 Vendor 0.00022 0.00016 0.00541 0.00193 0.00003 0.00006 0.00117 0.00124 0.00006 0.00032 0.00039 — 4.25914 4.25914 0.00005 0.00063 0.00430 4.45127 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00184 0.00179 0.00138 0.01757 0.00000 0.00000 0.00405 0.00405 0.00000 0.00095 0.00095 — 3.61238 3.61238 0.00008 0.00015 0.00512 3.66353 Vendor 0.00004 0.00003 0.00099 0.00035 0.00001 0.00001 0.00021 0.00023 0.00001 0.00006 0.00007 — 0.70515 0.70515 0.00001 0.00010 0.00071 0.73696 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
22 / 36
Vegetati TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
23 / 36
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
24 / 36
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Site Preparation Site Preparation 1/4/2027 1/8/2027 5.00000 5.00000 — Rough Grading Grading 1/11/2027 1/22/2027 5.00000 10.00000 — Fine Grading Grading 02/22/2027 3/5/2027 5.00000 10.00000 — Building Construction Building Construction 01/18/2027 7/23/2027 5.00000 135.000 — Paving Paving 03/08/2027 3/12/2027 5.00000 5.00000 —
Architectural Coating Architectural Coating 06/28/2027 7/23/2027 5.00000 20.0000 — Utility Trenching Trenching 01/25/2027 2/19/2027 5.00000 20.0000 — Finishing & Landscaping Trenching 03/15/2027 4/30/2027 5.00000 35.0000 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Rough Grading Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Rough Grading Scrapers Diesel Average 2.00000 8.00000 423.000 0.48000 Fine Grading Graders Diesel Average 1.000000 8.00000 148.000 0.41000 Fine Grading Tractors/Loaders/Back
hoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Building Construction Forklifts Diesel Average 2.00000 8.00000 82.0000 0.20000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
25 / 36
Building Construction Generator Sets Diesel Average 1.000000 8.00000 14.0000 0.74000 Building Construction Welders Diesel Average 1.000000 8.00000 46.0000 0.45000 Paving Pavers Diesel Average 1.000000 8.00000 81.0000 0.42000 Paving Rollers Diesel Average 2.00000 8.00000 36.0000 0.38000 Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000 Utility Trenching Tractors/Loaders/Back
hoes
Diesel Average 2.00000 8.00000 84.0000 0.37000
Utility Trenching Excavators Diesel Average 2.00000 8.00000 36.0000 0.38000 Finishing &
Landscaping
Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Finishing &
Landscaping
Skid Steer Loaders Diesel Average 1.000000 8.00000 71.0000 0.37000

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Site Preparation Worker 12.0000 11.0400 LDA,LDT1,LDT2
Site Preparation Vendor 2.00000 7.37000 HHDT,MHDT
Site Preparation Hauling 0.00000 20.0000 HHDT
Site Preparation Onsite truck 1.000000 0.41250 HHDT
Rough Grading Worker 20.0000 11.0400 LDA,LDT1,LDT2
Rough Grading Vendor 10.00000 7.37000 HHDT,MHDT
Rough Grading Hauling 0.00000 20.0000 HHDT
Rough Grading Onsite truck 1.000000 1.65000 HHDT
Fine Grading Worker 10.00000 11.0400 LDA,LDT1,LDT2
Fine Grading Vendor 2.00000 7.37000 HHDT,MHDT
Fine Grading Hauling 0.00000 20.0000 HHDT
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
26 / 36
Fine Grading Onsite truck 1.000000 0.41250 HHDT
Building Construction Worker 120.000 11.0400 LDA,LDT1,LDT2 Building Construction Vendor 14.7431 7.37000 HHDT,MHDT
Building Construction Hauling 0.00000 20.0000 HHDT
Building Construction Onsite truck — — HHDT
Paving Worker 32.0000 11.0400 LDA,LDT1,LDT2
Paving Vendor 16.0000 7.37000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 5.75693 11.0400 LDA,LDT1,LDT2 Architectural Coating Vendor — 7.37000 HHDT,MHDT
Architectural Coating Hauling 0.00000 20.0000 HHDT
Architectural Coating Onsite truck — — HHDT
Utility Trenching Worker 24.0000 11.0400 LDA,LDT1,LDT2
Utility Trenching Vendor 2.00000 7.37000 HHDT,MHDT
Utility Trenching Hauling 0.00000 20.0000 HHDT
Utility Trenching Onsite truck — — HHDT
Finishing & Landscaping Worker 30.0000 11.0400 LDA,LDT1,LDT2 Finishing & Landscaping Vendor 2.00000 7.37000 HHDT,MHDT Finishing & Landscaping Hauling 0.00000 20.0000 HHDT
Finishing & Landscaping Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
27 / 36
Phase Name Residential Interior Area Parking Area Coated (sq ft) Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Architectural Coating 0.00000 0.00000 134,928 44,976.0 19,456.4

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Site Preparation — — 0.00000 0.00000 0.00000
Rough Grading — — 20.0000 0.00000 0.00000
Fine Grading — — 5.00000 0.00000 0.00000
Paving 0.00000 0.00000 0.00000 0.00000 7.44430

5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.

5.7. Construction Paving
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Regional Shopping Center 0.00000 0%
Paving Parking Lot 4.94850 100%
Paving Other Asphalt Surfaces 2.49580 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2027 0.00000 203.983 0.03300 0.00400

5.18. Vegetation
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
28 / 36

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 20.0600 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.00000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
29 / 36
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 0 0 0 N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 1 1 1 2
Drought 1 1 1 2
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
30 / 36
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6279
AQ-PM 99.3155
AQ-DPM 54.8102
Drinking Water 72.9986
Lead Risk Housing 7.14556
Pesticides 0.00000
Toxic Releases 39.1223
Traffic 67.1875
Effect Indicators —
CleanUp Sites 27.4916
Groundwater 59.6048
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
31 / 36
Sensitive Population —
Asthma 21.0867
Cardio-vascular 30.7951
Low Birth Weights 28.0729
Socioeconomic Factor Indicators —
Education 29.6760
Housing 15.5006
Linguistic 21.4237
Poverty 22.0101
Unemployment 67.4779

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 74.07930194
Employed 65.05838573
Median HI 66.79070961
Education —
Bachelor's or higher 57.08969588
High school enrollment 100
Preschool enrollment 17.9006801
Transportation —
Auto Access 52.9449506
Active commuting 56.70473502
Social —
2-parent households 19.17105094
Voting 67.22699859
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
32 / 36
Neighborhood —
Alcohol availability 71.87219299
Park access 52.55998973
Retail density 27.37071731
Supermarket access 19.78698832
Tree canopy 9.187732581
Housing —
Homeownership 39.93327345
Housing habitability 84.98652637
Low-inc homeowner severe housing cost burden 93.301681
Low-inc renter severe housing cost burden 84.08828436
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 92.01847812
Arthritis 31.2
Asthma ER Admissions 73.6
High Blood Pressure 29.0
Cancer (excluding skin) 16.1
Asthma 51.9
Coronary Heart Disease 37.1
Chronic Obstructive Pulmonary Disease 50.7
Diagnosed Diabetes 80.8
Life Expectancy at Birth 53.0
Cognitively Disabled 66.4
Physically Disabled 26.6
Heart Attack ER Admissions 46.6
Mental Health Not Good 60.0
Chronic Kidney Disease 45.1
LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
33 / 36
Obesity 52.4
Pedestrian Injuries 74.9
Physical Health Not Good 65.0
Stroke 45.2
Health Risk Behaviors —
Binge Drinking 11.3
Current Smoker 53.5
No Leisure Time for Physical Activity 58.6
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 53.3
Elderly 40.9
English Speaking 76.1
Foreign-born 16.0
Outdoor Workers 46.6
Climate Change Adaptive Capacity —
Impervious Surface Cover 59.7
Traffic Density 56.7
Traffic Access 0.0
Other Indices —
Hardship 35.5
Other Decision Support —
2016 Voting 53.7

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 30.0000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
34 / 36
Healthy Places Index Score for Project Location (b) 57.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data

8.1. Justifications
Screen Justification
Land Use Based on information provided.

Construction: Construction Phases Based on information provided by the project applicant. See appendix for further details.

Construction: Off-Road Equipment Based on information provided by the project applicant. Please see appendix for further details.

Construction: Trips and VMT Based on information provided by the project applicant. See appendix for further details.

Operations: Vehicle Data Based on information provided by the project traffic consultant.

Operations: Fleet Mix Based on information provided by the traffic consultant.

Operations: Energy Use The estimated 266,604 kWh/yr of renewable electricity generated from onsite PV system for Phase 2 is subtracted from the Title 24 electricity default total.

Operations: Water and Waste Water Based on the full buildout demand from the Water Supply and Demand Analysis Coffee and Rosedale Commercial Retail Development Project study prepared by PlaceWorks.

LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
35 / 36

8.3. Land Use
Model Parameter Units Default Value New Value
Lot Area acre 2.06501 1.77000
Landscape Area sq. ft — 81,183.0
Special Landscape Area sq. ft — 0.00000
Lot Area acre 3.33900 4.94850
Landscape Area sq. ft — 0.00000

8.4. Construction

8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Site Preparation Site Preparation Start Date 2/2/2027 1/4/2027 Site Preparation Site Preparation End Date 2/16/2027 1/8/2027 Site Preparation Site Preparation Work Days per Phase 10.00000 5.00000 Building Construction Building Construction Start Date 3/18/2027 01/18/2027 Building Construction Building Construction End Date 2/3/2028 7/23/2027 Building Construction Building Construction Work Days per Phase 230.000 135.000 Paving Paving Start Date 2/4/2028 03/08/2027
Paving Paving End Date 3/3/2028 3/12/2027
Paving Paving Work Days per Phase 20.0000 5.00000
Architectural Coating Architectural Coating Start Date 3/4/2028 06/28/2027 Architectural Coating Architectural Coating End Date 4/1/2028 7/23/2027

8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Site Preparation Tractors/Loaders/Backhoes Number per Day 4.00000 1.000000 LOKH-01_Construction Phase 2 Detailed Report, 2/9/2026
36 / 36
Rough Grading Tractors/Loaders/Backhoes Number per Day 3.00000 1.000000 Fine Grading Tractors/Loaders/Backhoes Number per Day 3.00000 2.00000 Building Construction Forklifts Number per Day 3.00000 2.00000 Paving Pavers Number per Day 2.00000 1.000000

8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Site Preparation Worker One-Way Trips per Day 2.50000 12.0000 Rough Grading Worker One-Way Trips per Day 7.50000 20.0000 Fine Grading Worker One-Way Trips per Day 7.50000 10.00000 Building Construction Worker One-Way Trips per Day 28.7846 120.000 Paving Worker One-Way Trips per Day 10.00000 32.0000
Utility Trenching Worker One-Way Trips per Day 10.00000 24.0000 Finishing & Landscaping Worker One-Way Trips per Day 5.00000 30.0000 Construction - Traffic Signal Detailed Report, 2/7/2026 1 / 21
Construction - Traffic Signal Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Utility Trenching (2026) - Unmitigated

3.3. Traffic Signal Install (2026) - Unmitigated

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Construction - Traffic Signal Detailed Report, 2/7/2026 2 / 21

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type
Construction - Traffic Signal Detailed Report, 2/7/2026 3 / 21

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.4. Construction
Construction - Traffic Signal Detailed Report, 2/7/2026 4 / 21

8.4.2. Off-Road Equipment

8.4.6. Trips and VMT
Construction - Traffic Signal Detailed Report, 2/7/2026 5 / 21

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name Construction - Traffic Signal
Construction Start Date 7/6/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.380426247940335, -119.09203546194102
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2802
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.37

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Other Non-Asphalt
Surfaces
410.000 1000sqft 9.41230 0.00000 0.00000 — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 6 / 21

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.09622 0.08432 0.43134 1.42825 0.00138 0.01506 0.16446 0.17583 0.01393 0.03929 0.04983 — 309.829 309.829 0.00607 0.01531 0.68936 315.232 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00853 0.00732 0.04773 0.09615 0.00015 0.00145 0.01252 0.01397 0.00134 0.00301 0.00436 — 27.7971 27.7971 0.00066 0.00151 0.02441 28.2869 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00156 0.00134 0.00871 0.01755 0.00003 0.00026 0.00229 0.00255 0.00024 0.00055 0.00079 — 4.60212 4.60212 0.00011 0.00025 0.00404 4.68322

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 0.09622 0.08432 0.43134 1.42825 0.00138 0.01506 0.16446 0.17583 0.01393 0.03929 0.04983 — 309.829 309.829 0.00607 0.01531 0.68936 315.232 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 7 / 21
2026 0.00853 0.00732 0.04773 0.09615 0.00015 0.00145 0.01252 0.01397 0.00134 0.00301 0.00436 — 27.7971 27.7971 0.00066 0.00151 0.02441 28.2869 Annual — — — — — — — — — — — — — — — — — —
2026 0.00156 0.00134 0.00871 0.01755 0.00003 0.00026 0.00229 0.00255 0.00024 0.00055 0.00079 — 4.60212 4.60212 0.00011 0.00025 0.00404 4.68322

3. Construction Emissions Details

3.1. Utility Trenching (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.03602 0.03027 0.30994 0.57244 0.00080 0.01044 — 0.01044 0.00960 — 0.00960 — 87.1088 87.1088 0.00353 0.00071 — 87.4078 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00197 0.00166 0.01698 0.03137 0.00004 0.00057 — 0.00057 0.00053 — 0.00053 — 4.77309 4.77309 0.00019 0.00004 — 4.78947 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 8 / 21
Off-Roa 0.00036 0.00030 0.00310 0.00572 0.00001 0.00010 — 0.00010 0.00010 — 0.00010 — 0.79024 0.79024 0.00003 0.00001 — 0.79295 d
Equipm
ent
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05738 0.05201 0.04482 0.83271 0.00000 0.00000 0.14668 0.14668 0.00000 0.03438 0.03438 — 158.382 158.382 0.00185 0.00537 0.52228 160.551 Vendor 0.00281 0.00204 0.07167 0.02310 0.00047 0.00093 0.01778 0.01872 0.00093 0.00491 0.00585 — 64.3378 64.3378 0.00069 0.00923 0.16709 67.2735 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00288 0.00256 0.00274 0.03403 0.00000 0.00000 0.00794 0.00794 0.00000 0.00186 0.00186 — 7.90914 7.90914 0.00013 0.00031 0.01237 8.01678 Vendor 0.00015 0.00011 0.00411 0.00128 0.00003 0.00005 0.00096 0.00102 0.00005 0.00027 0.00032 — 3.52664 3.52664 0.00004 0.00051 0.00396 3.68230 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00053 0.00047 0.00050 0.00621 0.00000 0.00000 0.00145 0.00145 0.00000 0.00034 0.00034 — 1.30945 1.30945 0.00002 0.00005 0.00205 1.32727 Vendor 0.00003 0.00002 0.00075 0.00023 <

0.000005

0.00001 0.00018 0.00019 0.00001 0.00005 0.00006 — 0.58388 0.58388 0.00001 0.00008 0.00065 0.60965 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.3. Traffic Signal Install (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 9 / 21
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Off-Roa
d
Equipm
ent

0.04414 0.03709 0.34473 0.30731 0.00091 0.01413 — 0.01413 0.01300 — 0.01300 — 99.0099 99.0099 0.00402 0.00080 — 99.3496 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00242 0.00203 0.01889 0.01684 0.00005 0.00077 — 0.00077 0.00071 — 0.00071 — 5.42520 5.42520 0.00022 0.00004 — 5.44382 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00044 0.00037 0.00345 0.00307 0.00001 0.00014 — 0.00014 0.00013 — 0.00013 — 0.89820 0.89820 0.00004 0.00001 — 0.90129 Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.01913 0.01734 0.01494 0.27757 0.00000 0.00000 0.04889 0.04889 0.00000 0.01146 0.01146 — 52.7940 52.7940 0.00062 0.00179 0.17409 53.5170 Vendor 0.00281 0.00204 0.07167 0.02310 0.00047 0.00093 0.01778 0.01872 0.00093 0.00491 0.00585 — 64.3378 64.3378 0.00069 0.00923 0.16709 67.2735 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Construction - Traffic Signal Detailed Report, 2/7/2026 10 / 21
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00096 0.00085 0.00091 0.01134 0.00000 0.00000 0.00265 0.00265 0.00000 0.00062 0.00062 — 2.63638 2.63638 0.00004 0.00010 0.00412 2.67226 Vendor 0.00015 0.00011 0.00411 0.00128 0.00003 0.00005 0.00096 0.00102 0.00005 0.00027 0.00032 — 3.52664 3.52664 0.00004 0.00051 0.00396 3.68230 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00018 0.00016 0.00017 0.00207 0.00000 0.00000 0.00048 0.00048 0.00000 0.00011 0.00011 — 0.43648 0.43648 0.00001 0.00002 0.00068 0.44242 Vendor 0.00003 0.00002 0.00075 0.00023 <

0.000005

0.00001 0.00018 0.00019 0.00001 0.00005 0.00006 — 0.58388 0.58388 0.00001 0.00008 0.00065 0.60965 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 11 / 21

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Construction - Traffic Signal Detailed Report, 2/7/2026 12 / 21
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Utility Trenching Trenching 7/6/2026 7/31/2026 5.00000 20.0000 — Traffic Signal Install Trenching 8/17/2026 9/11/2026 5.00000 20.0000 — Construction - Traffic Signal Detailed Report, 2/7/2026 13 / 21

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Utility Trenching Tractors/Loaders/Back
hoes
Diesel Average 1.000000 2.40000 84.0000 0.37000
Traffic Signal Install Cranes Diesel Average 1.000000 0.80000 367.000 0.29000

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Utility Trenching Worker 12.0000 17.3000 LDA,LDT1,LDT2
Utility Trenching Vendor 2.00000 10.6000 HHDT,MHDT
Utility Trenching Hauling 0.00000 20.0000 HHDT
Utility Trenching Onsite truck — — HHDT
Traffic Signal Install Worker 4.00000 17.3000 LDA,LDT1,LDT2 Traffic Signal Install Vendor 2.00000 10.6000 HHDT,MHDT Traffic Signal Install Hauling 0.00000 20.0000 HHDT
Traffic Signal Install Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings

5.6. Dust Mitigation
Construction - Traffic Signal Detailed Report, 2/7/2026 14 / 21

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 203.983 0.03300 0.00400

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year) Construction - Traffic Signal Detailed Report, 2/7/2026 15 / 21

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 20.0600 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.00000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 0 0 0 N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
Construction - Traffic Signal Detailed Report, 2/7/2026 16 / 21
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 1 1 1 2
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6279
Construction - Traffic Signal Detailed Report, 2/7/2026 17 / 21
AQ-PM 99.5271
AQ-DPM 80.5227
Drinking Water 66.2920
Lead Risk Housing 5.05356
Pesticides 0.00000
Toxic Releases 44.9862
Traffic 78.2000
Effect Indicators —
CleanUp Sites 84.6025
Groundwater 94.1391
Haz Waste Facilities/Generators 97.6572
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 82.3529
Cardio-vascular 88.9955
Low Birth Weights 90.5953
Socioeconomic Factor Indicators —
Education 14.1736
Housing 28.2383
Linguistic —
Poverty 44.4095
Unemployment 66.6059

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Construction - Traffic Signal Detailed Report, 2/7/2026 18 / 21
Above Poverty 69.35711536
Employed 52.13653279
Median HI 67.9455922
Education —
Bachelor's or higher 44.83510843
High school enrollment 8.995252149
Preschool enrollment 17.59271141
Transportation —
Auto Access 84.51174131
Active commuting 5.543436417
Social —
2-parent households 99.56371102
Voting 86.60336199
Neighborhood —
Alcohol availability 82.79224945
Park access 25.7153856
Retail density 36.96907481
Supermarket access 10.45810343
Tree canopy 33.23495445
Housing —
Homeownership 92.7242397
Housing habitability 98.08802772
Low-inc homeowner severe housing cost burden 59.11715642 Low-inc renter severe housing cost burden 99.08892596
Uncrowded housing 78.31387142
Health Outcomes —
Insured adults 79.19928141
Arthritis 30.2
Construction - Traffic Signal Detailed Report, 2/7/2026 19 / 21
Asthma ER Admissions 14.3
High Blood Pressure 31.6
Cancer (excluding skin) 22.7
Asthma 46.1
Coronary Heart Disease 43.7
Chronic Obstructive Pulmonary Disease 37.6
Diagnosed Diabetes 73.9
Life Expectancy at Birth 14.8
Cognitively Disabled 38.1
Physically Disabled 42.3
Heart Attack ER Admissions 12.8
Mental Health Not Good 52.8
Chronic Kidney Disease 55.3
Obesity 37.0
Pedestrian Injuries 59.0
Physical Health Not Good 60.5
Stroke 58.2
Health Risk Behaviors —
Binge Drinking 7.5
Current Smoker 39.2
No Leisure Time for Physical Activity 59.9
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 36.4
Elderly 42.6
English Speaking 94.0
Foreign-born 7.2
Construction - Traffic Signal Detailed Report, 2/7/2026 20 / 21
Outdoor Workers 39.4
Climate Change Adaptive Capacity —
Impervious Surface Cover 55.3
Traffic Density 67.6
Traffic Access 0.0
Other Indices —
Hardship 26.1
Other Decision Support —
2016 Voting 69.4

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 83.0000 Healthy Places Index Score for Project Location (b) 56.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) Yes Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
Construction - Traffic Signal Detailed Report, 2/7/2026 21 / 21

8.1. Justifications
Screen Justification
Construction: Construction Phases Based on information provided by the project application. See appendix for further details.

Construction: Off-Road Equipment Based on information provided by the project applicant. See appendix for further information.

Construction: Trips and VMT Based on information provided by the project applicant. See appendix for further details.

8.4. Construction

8.4.2. Off-Road Equipment
Phase Name Equipment Type Model Parameter Default Value New Value Utility Trenching Tractors/Loaders/Backhoes Hours Per Day 8.00000 2.40000

8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Utility Trenching Worker One-Way Trips per Day 2.50000 12.0000 Traffic Signal Install Worker One-Way Trips per Day 2.50000 4.00000 Construction Left Turn Lane Detailed Report, 2/7/2026
1 / 31
Construction Left Turn Lane Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Demolition (2026) - Unmitigated

3.3. Site Preparation (2026) - Unmitigated

3.5. Rough Grading (2026) - Unmitigated

3.7. Fine Grading (2026) - Unmitigated

3.9. Paving (2026) - Unmitigated

3.11. Architectural Coating (2026) - Unmitigated

4. Operations Emissions Details
Construction Left Turn Lane Detailed Report, 2/7/2026
2 / 31

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors Construction Left Turn Lane Detailed Report, 2/7/2026
3 / 31

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard
Construction Left Turn Lane Detailed Report, 2/7/2026
4 / 31

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.4. Construction

8.4.1. Construction Phases

8.4.6. Trips and VMT
Construction Left Turn Lane Detailed Report, 2/7/2026
5 / 31

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name Construction Left Turn Lane
Construction Start Date 06/08/2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.38306245338788, -119.09454120195048
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2817
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.37

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Other Asphalt
Surfaces

8.30500 1000sqft 0.19066 0.00000 0.00000 0.00000 — —
Construction Left Turn Lane Detailed Report, 2/7/2026
6 / 31

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.48941 2.46167 7.99036 6.21100 0.01962 0.45698 3.09551 3.20962 0.42063 0.53926 0.64729 — 2,697.82 2,697.82 0.05814 0.32102 4.85275 2,799.49 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.03809 0.03312 0.25010 0.30012 0.00066 0.01015 0.04849 0.05864 0.00939 0.00887 0.01826 — 84.5990 84.5990 0.00236 0.00563 0.04168 86.3773 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.00695 0.00604 0.04564 0.05477 0.00012 0.00185 0.00885 0.01070 0.00171 0.00162 0.00333 — 14.0063 14.0063 0.00039 0.00093 0.00690 14.3007

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2026 2.48941 2.46167 7.99036 6.21100 0.01962 0.45698 3.09551 3.20962 0.42063 0.53926 0.64729 — 2,697.82 2,697.82 0.05814 0.32102 4.85275 2,799.49 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
7 / 31
2026 0.03809 0.03312 0.25010 0.30012 0.00066 0.01015 0.04849 0.05864 0.00939 0.00887 0.01826 — 84.5990 84.5990 0.00236 0.00563 0.04168 86.3773 Annual — — — — — — — — — — — — — — — — — —
2026 0.00695 0.00604 0.04564 0.05477 0.00012 0.00185 0.00885 0.01070 0.00171 0.00162 0.00333 — 14.0063 14.0063 0.00039 0.00093 0.00690 14.3007

3. Construction Emissions Details

3.1. Demolition (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.25389 0.21334 2.38706 4.36548 0.00629 0.07601 — 0.07601 0.06993 — 0.06993 — 680.467 680.467 0.02760 0.00552 — 682.802 Demoliti
on
— — — — — — 2.49916 2.49916 — 0.37844 0.37844 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00348 0.00292 0.03270 0.05980 0.00009 0.00104 — 0.00104 0.00096 — 0.00096 — 9.32146 9.32146 0.00038 0.00008 — 9.35345 Demoliti
on
— — — — — — 0.03424 0.03424 — 0.00518 0.00518 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Construction Left Turn Lane Detailed Report, 2/7/2026
8 / 31
Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00063 0.00053 0.00597 0.01091 0.00002 0.00019 — 0.00019 0.00017 — 0.00017 — 1.54327 1.54327 0.00006 0.00001 — 1.54857 Demoliti
on
— — — — — — 0.00625 0.00625 — 0.00095 0.00095 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03494 0.03247 0.02104 0.37628 0.00000 0.00000 0.06240 0.06240 0.00000 0.01463 0.01463 — 67.8795 67.8795 0.00123 0.00248 0.22219 68.8705 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.06857 0.03683 2.26797 0.49906 0.01333 0.03810 0.53395 0.57205 0.03810 0.14619 0.18428 — 1,949.48 1,949.48 0.01714 0.31302 4.63055 2,047.82 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00044 0.00040 0.00032 0.00398 0.00000 0.00000 0.00084 0.00084 0.00000 0.00020 0.00020 — 0.84814 0.84814 0.00002 0.00004 0.00132 0.86083 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00092 0.00048 0.03246 0.00690 0.00018 0.00052 0.00725 0.00777 0.00052 0.00199 0.00251 — 26.7136 26.7136 0.00023 0.00429 0.02736 28.0246 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00008 0.00007 0.00006 0.00073 0.00000 0.00000 0.00015 0.00015 0.00000 0.00004 0.00004 — 0.14042 0.14042 <

0.000005

0.00001 0.00022 0.14252
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00017 0.00009 0.00592 0.00126 0.00003 0.00010 0.00132 0.00142 0.00010 0.00036 0.00046 — 4.42274 4.42274 0.00004 0.00071 0.00453 4.63980

3.3. Site Preparation (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Construction Left Turn Lane Detailed Report, 2/7/2026
9 / 31
Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.19385 0.16289 1.87048 3.41140 0.00494 0.05862 — 0.05862 0.05393 — 0.05393 — 535.285 535.285 0.02171 0.00434 — 537.122 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00266 0.00223 0.02562 0.04673 0.00007 0.00080 — 0.00080 0.00074 — 0.00074 — 7.33268 7.33268 0.00030 0.00006 — 7.35784 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00048 0.00041 0.00468 0.00853 0.00001 0.00015 — 0.00015 0.00013 — 0.00013 — 1.21401 1.21401 0.00005 0.00001 — 1.21817 Construction Left Turn Lane Detailed Report, 2/7/2026
10 / 31
Dust — — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — From
Material
Movement
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03494 0.03247 0.02104 0.37628 0.00000 0.00000 0.06240 0.06240 0.00000 0.01463 0.01463 — 67.8795 67.8795 0.00123 0.00248 0.22219 68.8705 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00044 0.00040 0.00032 0.00398 0.00000 0.00000 0.00084 0.00084 0.00000 0.00020 0.00020 — 0.84814 0.84814 0.00002 0.00004 0.00132 0.86083 Vendor 0.00003 0.00002 0.00080 0.00029 <

0.000005

0.00001 0.00017 0.00018 0.00001 0.00005 0.00006 — 0.62240 0.62240 0.00001 0.00009 0.00069 0.64991 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00008 0.00007 0.00006 0.00073 0.00000 0.00000 0.00015 0.00015 0.00000 0.00004 0.00004 — 0.14042 0.14042 <

0.000005

0.00001 0.00022 0.14252
Vendor 0.00001 <

0.000005

0.00015 0.00005 <

0.000005
<

0.000005

0.00003 0.00003 <

0.000005

0.00001 0.00001 — 0.10304 0.10304 <

0.000005

0.00001 0.00011 0.10760
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.5. Rough Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Construction Left Turn Lane Detailed Report, 2/7/2026
11 / 31
Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.12007 0.10089 1.03315 1.90815 0.00268 0.03479 — 0.03479 0.03201 — 0.03201 — 290.363 290.363 0.01178 0.00236 — 291.359 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00329 0.00276 0.02831 0.05228 0.00007 0.00095 — 0.00095 0.00088 — 0.00088 — 7.95514 7.95514 0.00032 0.00006 — 7.98244 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00060 0.00050 0.00517 0.00954 0.00001 0.00017 — 0.00017 0.00016 — 0.00016 — 1.31706 1.31706 0.00005 0.00001 — 1.32158 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Construction Left Turn Lane Detailed Report, 2/7/2026
12 / 31
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03494 0.03247 0.02104 0.37628 0.00000 0.00000 0.06240 0.06240 0.00000 0.01463 0.01463 — 67.8795 67.8795 0.00123 0.00248 0.22219 68.8705 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00087 0.00079 0.00064 0.00796 0.00000 0.00000 0.00169 0.00169 0.00000 0.00040 0.00040 — 1.69628 1.69628 0.00004 0.00007 0.00263 1.72166 Vendor 0.00006 0.00005 0.00160 0.00057 0.00001 0.00002 0.00034 0.00035 0.00002 0.00009 0.00011 — 1.24479 1.24479 0.00001 0.00018 0.00137 1.29983 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00016 0.00014 0.00012 0.00145 0.00000 0.00000 0.00031 0.00031 0.00000 0.00007 0.00007 — 0.28084 0.28084 0.00001 0.00001 0.00044 0.28504 Vendor 0.00001 0.00001 0.00029 0.00010 <

0.000005
<

0.000005

0.00006 0.00006 <

0.000005

0.00002 0.00002 — 0.20609 0.20609 <

0.000005

0.00003 0.00023 0.21520
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.7. Fine Grading (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
13 / 31
Off-Roa 0.12007 0.10089 1.03315 1.90815 0.00268 0.03479 — 0.03479 0.03201 — 0.03201 — 290.363 290.363 0.01178 0.00236 — 291.359 d
Equipm
Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00164 0.00138 0.01415 0.02614 0.00004 0.00048 — 0.00048 0.00044 — 0.00044 — 3.97757 3.97757 0.00016 0.00003 — 3.99122 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00030 0.00025 0.00258 0.00477 0.00001 0.00009 — 0.00009 0.00008 — 0.00008 — 0.65853 0.65853 0.00003 0.00001 — 0.66079 Dust
From
Material
Movement
— — — — — — 0.00000 0.00000 — 0.00000 0.00000 — — — — — — — Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
14 / 31
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Worker 0.03494 0.03247 0.02104 0.37628 0.00000 0.00000 0.06240 0.06240 0.00000 0.01463 0.01463 — 67.8795 67.8795 0.00123 0.00248 0.22219 68.8705 Vendor 0.00239 0.00175 0.05614 0.02053 0.00032 0.00065 0.01236 0.01301 0.00065 0.00342 0.00407 — 45.4114 45.4114 0.00055 0.00653 0.11617 47.4862 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00044 0.00040 0.00032 0.00398 0.00000 0.00000 0.00084 0.00084 0.00000 0.00020 0.00020 — 0.84814 0.84814 0.00002 0.00004 0.00132 0.86083 Vendor 0.00003 0.00002 0.00080 0.00029 <

0.000005

0.00001 0.00017 0.00018 0.00001 0.00005 0.00006 — 0.62240 0.62240 0.00001 0.00009 0.00069 0.64991 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00008 0.00007 0.00006 0.00073 0.00000 0.00000 0.00015 0.00015 0.00000 0.00004 0.00004 — 0.14042 0.14042 <

0.000005

0.00001 0.00022 0.14252
Vendor 0.00001 <

0.000005

0.00015 0.00005 <

0.000005
<

0.000005

0.00003 0.00003 <

0.000005

0.00001 0.00001 — 0.10304 0.10304 <

0.000005

0.00001 0.00011 0.10760
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.9. Paving (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

1.08397 0.91084 7.73422 5.56445 0.01231 0.45438 — 0.45438 0.41803 — 0.41803 — 1,333.79 1,333.79 0.05410 0.01082 — 1,338.37 Construction Left Turn Lane Detailed Report, 2/7/2026
15 / 31
Paving 0.09990 0.09990 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.01485 0.01248 0.10595 0.07623 0.00017 0.00622 — 0.00622 0.00573 — 0.00573 — 18.2711 18.2711 0.00074 0.00015 — 18.3338 Paving 0.00137 0.00137 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00271 0.00228 0.01934 0.01391 0.00003 0.00114 — 0.00114 0.00105 — 0.00105 — 3.02499 3.02499 0.00012 0.00002 — 3.03537 Paving 0.00025 0.00025 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05241 0.04870 0.03157 0.56442 0.00000 0.00000 0.09360 0.09360 0.00000 0.02194 0.02194 — 101.819 101.819 0.00185 0.00371 0.33329 103.306 Vendor 0.00954 0.00701 0.22458 0.08213 0.00130 0.00260 0.04946 0.05206 0.00260 0.01366 0.01626 — 181.645 181.645 0.00218 0.02611 0.46469 189.945 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
16 / 31
Worker 0.00065 0.00059 0.00048 0.00597 0.00000 0.00000 0.00127 0.00127 0.00000 0.00030 0.00030 — 1.27221 1.27221 0.00003 0.00005 0.00197 1.29124 Vendor 0.00012 0.00009 0.00321 0.00114 0.00002 0.00004 0.00067 0.00071 0.00004 0.00019 0.00022 — 2.48958 2.48958 0.00003 0.00036 0.00275 2.59966 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00012 0.00011 0.00009 0.00109 0.00000 0.00000 0.00023 0.00023 0.00000 0.00005 0.00005 — 0.21063 0.21063 0.00001 0.00001 0.00033 0.21378 Vendor 0.00002 0.00002 0.00059 0.00021 <

0.000005

0.00001 0.00012 0.00013 0.00001 0.00003 0.00004 — 0.41218 0.41218 <

0.000005

0.00006 0.00046 0.43040
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

3.11. Architectural Coating (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.14557 0.12031 0.85645 1.13283 0.00173 0.02315 — 0.02315 0.02130 — 0.02130 — 133.504 133.504 0.00542 0.00108 — 133.963 Architect
ural
Coating
s

2.30889 2.30889 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
17 / 31
< — 0.36702

0.000005
< 0.00006 — 0.00006 0.00006 — 0.00006 — 0.36577 0.36577 0.00001

0.000005
Off-Roa 0.00040 0.00033 0.00235 0.00310
d
Equipm
ent
Architect
ural
Coating
s

0.00633 0.00633 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Off-Roa
d
Equipm
ent

0.00007 0.00006 0.00043 0.00057 <

0.000005

0.00001 — 0.00001 0.00001 — 0.00001 — 0.06056 0.06056 <

0.000005
<

0.000005
— 0.06076
Architect
ural
Coating
s

0.00115 0.00115 — — — — — — — — — — — — — — — —
Onsite
truck

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.03494 0.03247 0.02104 0.37628 0.00000 0.00000 0.06240 0.06240 0.00000 0.01463 0.01463 — 67.8795 67.8795 0.00123 0.00248 0.22219 68.8705 Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.00009 0.00008 0.00006 0.00080 0.00000 0.00000 0.00017 0.00017 0.00000 0.00004 0.00004 — 0.16963 0.16963 <

0.000005

0.00001 0.00026 0.17217
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Construction Left Turn Lane Detailed Report, 2/7/2026
18 / 31
Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Annual — — — — — — — — — — — — — — — — — —
Worker 0.00002 0.00001 0.00001 0.00015 0.00000 0.00000 0.00003 0.00003 0.00000 0.00001 0.00001 — 0.02808 0.02808 <

0.000005
<

0.000005

0.00004 0.02850
Vendor 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Hauling 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Construction Left Turn Lane Detailed Report, 2/7/2026
19 / 31
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Construction Left Turn Lane Detailed Report, 2/7/2026
20 / 31
Sequest — — — — — — — — — — — — — — — — — —
ered
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 6/8/2026 6/12/2026 5.00000 5.00000 — Site Preparation Site Preparation 6/15/2026 6/19/2026 5.00000 5.00000 — Rough Grading Grading 6/22/2026 7/3/2026 5.00000 10.00000 — Fine Grading Grading 08/03/2026 8/7/2026 5.00000 5.00000 — Paving Paving 08/10/2026 8/14/2026 5.00000 5.00000 —
Architectural Coating Architectural Coating 8/17/2026 8/17/2026 5.00000 1.000000 — Construction Left Turn Lane Detailed Report, 2/7/2026
21 / 31

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Demolition Skid Steer Loaders Diesel Average 1.000000 8.00000 71.0000 0.37000 Demolition Tractors/Loaders/Back
hoes
Diesel Average 2.00000 6.00000 84.0000 0.37000
Site Preparation Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Site Preparation Skid Steer Loaders Diesel Average 1.000000 8.00000 71.0000 0.37000 Rough Grading Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Fine Grading Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 84.0000 0.37000
Paving Pavers Diesel Average 1.000000 8.00000 225.000 0.42000 Paving Rollers Diesel Average 1.000000 8.00000 50.0000 0.38000 Paving Tractors/Loaders/Back
hoes
Diesel Average 1.000000 8.00000 80.0000 0.37000
Architectural Coating Air Compressors Diesel Average 1.000000 6.00000 37.0000 0.48000

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition Worker 8.00000 11.0400 LDA,LDT1,LDT2
Demolition Vendor — 7.37000 HHDT,MHDT
Demolition Hauling 28.8000 20.0000 HHDT
Demolition Onsite truck — — HHDT
Site Preparation Worker 8.00000 11.0400 LDA,LDT1,LDT2
Site Preparation Vendor 2.00000 7.37000 HHDT,MHDT
Construction Left Turn Lane Detailed Report, 2/7/2026
22 / 31
Site Preparation Hauling 0.00000 20.0000 HHDT
Site Preparation Onsite truck — — HHDT
Rough Grading Worker 8.00000 11.0400 LDA,LDT1,LDT2
Rough Grading Vendor 2.00000 7.37000 HHDT,MHDT
Rough Grading Hauling 0.00000 20.0000 HHDT
Rough Grading Onsite truck — — HHDT
Fine Grading Worker 8.00000 11.0400 LDA,LDT1,LDT2
Fine Grading Vendor 2.00000 7.37000 HHDT,MHDT
Fine Grading Hauling 0.00000 20.0000 HHDT
Fine Grading Onsite truck — — HHDT
Paving Worker 12.0000 11.0400 LDA,LDT1,LDT2
Paving Vendor 8.00000 7.37000 HHDT,MHDT
Paving Hauling 0.00000 20.0000 HHDT
Paving Onsite truck — — HHDT
Architectural Coating Worker 8.00000 11.0400 LDA,LDT1,LDT2 Architectural Coating Vendor — 7.37000 HHDT,MHDT
Architectural Coating Hauling 0.00000 20.0000 HHDT
Architectural Coating Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00000 0.00000 0.00000 0.00000 498.000 Construction Left Turn Lane Detailed Report, 2/7/2026
23 / 31

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Demolition 0.00000 0.00000 0.00000 575.000 0.00000
Site Preparation — — 0.00000 0.00000 0.00000
Rough Grading — — 0.00000 0.00000 0.00000
Fine Grading — — 0.00000 0.00000 0.00000
Paving 0.00000 0.00000 0.00000 0.00000 0.19066

5.6.2. Construction Earthmoving Control Strategies
Non-applicable. No control strategies activated by user.

5.7. Construction Paving
Phase Name Land Use Area Paved (acres) % Asphalt
Paving Other Asphalt Surfaces 0.19066 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2026 0.00000 203.983 0.03300 0.00400

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Construction Left Turn Lane Detailed Report, 2/7/2026
24 / 31
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 20.0600 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise 0.00000 meters of inundation depth
Wildfire 0.00000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Construction Left Turn Lane Detailed Report, 2/7/2026
25 / 31
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 0 0 0 N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 1 1 1 2
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
Construction Left Turn Lane Detailed Report, 2/7/2026
26 / 31
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6279
AQ-PM 99.3155
AQ-DPM 54.8102
Drinking Water 72.9986
Lead Risk Housing 7.14556
Pesticides 0.00000
Toxic Releases 39.1223
Traffic 67.1875
Effect Indicators —
CleanUp Sites 27.4916
Groundwater 59.6048
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 21.0867
Construction Left Turn Lane Detailed Report, 2/7/2026
27 / 31
Cardio-vascular 30.7951
Low Birth Weights 28.0729
Socioeconomic Factor Indicators —
Education 29.6760
Housing 15.5006
Linguistic 21.4237
Poverty 22.0101
Unemployment 67.4779

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 74.07930194
Employed 65.05838573
Median HI 66.79070961
Education —
Bachelor's or higher 57.08969588
High school enrollment 100
Preschool enrollment 17.9006801
Transportation —
Auto Access 52.9449506
Active commuting 56.70473502
Social —
2-parent households 19.17105094
Voting 67.22699859
Neighborhood —
Alcohol availability 71.87219299
Construction Left Turn Lane Detailed Report, 2/7/2026
28 / 31
Park access 52.55998973
Retail density 27.37071731
Supermarket access 19.78698832
Tree canopy 9.187732581
Housing —
Homeownership 39.93327345
Housing habitability 84.98652637
Low-inc homeowner severe housing cost burden 93.301681
Low-inc renter severe housing cost burden 84.08828436
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 92.01847812
Arthritis 31.2
Asthma ER Admissions 73.6
High Blood Pressure 29.0
Cancer (excluding skin) 16.1
Asthma 51.9
Coronary Heart Disease 37.1
Chronic Obstructive Pulmonary Disease 50.7
Diagnosed Diabetes 80.8
Life Expectancy at Birth 53.0
Cognitively Disabled 66.4
Physically Disabled 26.6
Heart Attack ER Admissions 46.6
Mental Health Not Good 60.0
Chronic Kidney Disease 45.1
Obesity 52.4
Pedestrian Injuries 74.9
Construction Left Turn Lane Detailed Report, 2/7/2026
29 / 31
Physical Health Not Good 65.0
Stroke 45.2
Health Risk Behaviors —
Binge Drinking 11.3
Current Smoker 53.5
No Leisure Time for Physical Activity 58.6
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 53.3
Elderly 40.9
English Speaking 76.1
Foreign-born 16.0
Outdoor Workers 46.6
Climate Change Adaptive Capacity —
Impervious Surface Cover 59.7
Traffic Density 56.7
Traffic Access 0.0
Other Indices —
Hardship 35.5
Other Decision Support —
2016 Voting 53.7

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 30.0000 Healthy Places Index Score for Project Location (b) 57.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Construction Left Turn Lane Detailed Report, 2/7/2026
30 / 31
Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data

8.1. Justifications
Screen Justification
Construction: Construction Phases Based on provided information provided by the applicant.

Construction: Off-Road Equipment Based on information provided by the project applicant. Please see appendix for further details.

Construction: Trips and VMT Based on information provided by the project applicant. See the appendix for further details.

Construction: Architectural Coatings Striping

8.4. Construction

8.4.1. Construction Phases
Phase Type Phase Name Model Parameter Default Value New Value Demolition Demolition End Date 6/22/2026 6/12/2026
Demolition Demolition Work Days per Phase 10.00000 5.00000 Site Preparation Site Preparation Start Date 6/23/2026 6/15/2026 Construction Left Turn Lane Detailed Report, 2/7/2026
31 / 31
Site Preparation Site Preparation End Date 6/24/2026 6/19/2026 Site Preparation Site Preparation Work Days per Phase 1.000000 5.00000 Paving Paving Start Date 11/16/2026 08/10/2026
Paving Paving End Date 11/23/2026 8/14/2026
Architectural Coating Architectural Coating Start Date 11/24/2026 8/17/2026 Architectural Coating Architectural Coating End Date 12/1/2026 8/17/2026 Architectural Coating Architectural Coating Work Days per Phase 5.00000 1.000000

8.4.6. Trips and VMT
Phase Name Trip Type Model Parameter Default Value New Value Demolition Worker One-Way Trips per Day 7.50000 8.00000 Site Preparation Worker One-Way Trips per Day 5.00000 8.00000 Rough Grading Worker One-Way Trips per Day 2.50000 8.00000 Fine Grading Worker One-Way Trips per Day 2.50000 8.00000 Paving Worker One-Way Trips per Day 7.50000 12.0000
Architectural Coating Worker One-Way Trips per Day 0.00000 8.00000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 1 / 63
LOKH-01_Operation Full Buildout Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.3. Operations Emissions Compared Against Thresholds

2.4. Operations Emissions by Sector, Unmitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.3. Area Emissions by Source

4.3.1. Unmitigated
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 2 / 63

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.9. Operational Mobile Sources
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 3 / 63

5.9.1. Unmitigated

5.10. Operational Area Sources

5.10.1. Hearths

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 4 / 63

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 5 / 63

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.3. Land Use

8.5. Operations

8.5.1. Mobile Sources

8.5.1.1. Vehicle Data

8.5.1.2. Fleet Mix

8.5.3. Energy Usage

8.5.4. Water and Waste Water
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 6 / 63

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name LOKH-01_Operation Full Buildout
Operational Year 2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.382244024302594, -119.09464262587437
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2817
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.41

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Regional Shopping
Center
335.003 1000sqft 7.39000 335,003 379,446 0.00000 — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 7 / 63
Medical Office 9.12900 1000sqft 0.20957 9,129.00 0.00000 — — — Building
Convenience
Market with Gas
Pumps

40.0000 Pump 0.01000 428.000 0.00000 — — —
Fast Food
Restaurant with
Drive Thru

16.8710 1000sqft 0.38730 16,871.0 0.00000 — — —
Automobile Care
Center

4.10000 1000sqft 0.09412 4,100.00 0.00000 — — —
Unrefrigerated
Warehouse-No Rail

40.0000 1000sqft 0.91827 40,000.0 0.00000 — — —
Parking Lot 2.00000 Space 25.1500 0.00000 0.00000 — — — Other Asphalt
Surfaces
390.408 1000sqft 8.96253 0.00000 0.00000 — — —
Other Non-Asphalt
Surfaces

3.03616 Acre 3.03616 0.00000 0.00000 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.3. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 101.052 96.6986 58.2666 480.471 1.02358 0.99422 80.4144 81.4086 0.93701 20.4404 21.3774 489.446 108,082 108,572 54.8119 6.04619 448.279 112,192 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 8 / 63
Unmit. 89.4616 84.8740 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 83.8458 79.8082 56.4089 384.967 0.87410 0.90099 72.1065 73.0075 0.85224 18.3321 19.1843 489.446 92,902.9 93,392.3 54.8172 5.66711 246.729 96,698.3 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 15.3019 14.5650 10.2946 70.2565 0.15952 0.16443 13.1594 13.3239 0.15553 3.34561 3.50114 81.0334 15,381.1 15,462.2 9.07561 0.93825 40.8488 16,009.5

2.4. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 Area 12.5824 12.3404 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 101.052 96.6986 58.2666 480.471 1.02358 0.99422 80.4144 81.4086 0.93701 20.4404 21.3774 489.446 108,082 108,572 54.8119 6.04619 448.279 112,192 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Area 9.44408 9.44408 — — — — — — — — — — — — — — — —
Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 9 / 63
Total 89.4616 84.8740 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 72.6723 68.8449 54.6838 374.882 0.86367 0.75999 72.1065 72.8665 0.71501 18.3321 19.0471 — 88,112.5 88,112.5 5.00258 5.35474 129.775 89,963.1 Area 10.9918 10.8724 0.07319 8.69770 0.00052 0.01545 — 0.01545 0.01168 — 0.01168 — 35.7672 35.7672 0.00150 0.00031 — 35.8961 Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 83.8458 79.8082 56.4089 384.967 0.87410 0.90099 72.1065 73.0075 0.85224 18.3321 19.1843 489.446 92,902.9 93,392.3 54.8172 5.66711 246.729 96,698.3 Annual — — — — — — — — — — — — — — — — — —
Mobile 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4 Area 2.00600 1.98421 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301 Energy 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 767.362 767.362 0.10023 0.00926 — 772.628 Water — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Waste — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173 Refrig. — — — — — — — — — — — — — — — — 19.3631 19.3631 Total 15.3019 14.5650 10.2946 70.2565 0.15952 0.16443 13.1594 13.3239 0.15553 3.34561 3.50114 81.0334 15,381.1 15,462.2 9.07561 0.93825 40.8488 16,009.5

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 10 / 63
Regiona
Shopping
Center

37.3511 35.6502 23.8886 195.220 0.42840 0.35425 34.0201 34.3744 0.33328 8.64750 8.98078 — 43,683.2 43,683.2 2.11350 2.42562 140.170 44,599.0 Medical
Office
Building

0.61607 0.58801 0.39402 3.21995 0.00707 0.00584 0.56113 0.56697 0.00550 0.14263 0.14813 — 720.510 720.510 0.03486 0.04001 2.31197 735.616 Conveni
ence
Market
with Gas
Pumps

28.4951 27.1974 18.2246 148.933 0.32682 0.27025 25.9539 26.2241 0.25426 6.59716 6.85141 — 33,325.8 33,325.8 1.61239 1.85050 106.936 34,024.5 Fast
Food
Restaurant
with
Drive
Thru

20.3110 19.3860 12.9902 106.157 0.23296 0.19263 18.4996 18.6922 0.18123 4.70237 4.88360 — 23,754.2 23,754.2 1.14929 1.31901 76.2223 24,252.2 Automo
bile
Care
Center

1.35824 1.29639 0.86869 7.09899 0.01558 0.01288 1.23711 1.24999 0.01212 0.31446 0.32658 — 1,588.50 1,588.50 0.07686 0.08821 5.09716 1,621.80 Unrefrig
erated
Wareho
use-No
Rail

0.15651 0.14938 0.10010 0.81799 0.00180 0.00148 0.14255 0.14403 0.00140 0.03623 0.03763 — 183.037 183.037 0.00886 0.01016 0.58733 186.874 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 11 / 63
Regiona
Shopping
Center

33.7754 31.8730 27.1419 181.639 0.39316 0.35472 34.0201 34.3749 0.33373 8.64750 8.98124 — 40,119.1 40,119.1 2.58621 2.59640 3.63483 40,961.1 Medical
Office
Building

0.55709 0.52571 0.44768 2.99596 0.00648 0.00585 0.56113 0.56698 0.00550 0.14263 0.14814 — 661.724 661.724 0.04266 0.04283 0.05995 675.612 Conveni
ence
Market
with Gas
Pumps

25.7671 24.3158 20.7065 138.572 0.29994 0.27062 25.9539 26.2245 0.25460 6.59716 6.85176 — 30,606.7 30,606.7 1.97301 1.98079 2.77300 31,249.1 Fast
Food
Restaurant
with
Drive
Thru

18.3665 17.3320 14.7593 98.7724 0.21379 0.19289 18.4996 18.6925 0.18148 4.70237 4.88385 — 21,816.1 21,816.1 1.40634 1.41188 1.97656 22,274.0 Automo
bile
Care
Center

1.22821 1.15903 0.98699 6.60514 0.01430 0.01290 1.23711 1.25001 0.01214 0.31446 0.32659 — 1,458.89 1,458.89 0.09405 0.09442 0.13218 1,489.51 Unrefrig
erated
Wareho
use-No
Rail

0.14152 0.13355 0.11373 0.76109 0.00165 0.00149 0.14255 0.14403 0.00140 0.03623 0.03763 — 168.103 168.103 0.01084 0.01088 0.01523 171.631 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 12 / 63
Regiona 5.66233 5.36412 4.26074 29.2093 0.06729 0.05922 5.61824 5.67746 0.05571 1.42836 1.48407 — 6,228.16 6,228.16 0.35360 0.37850 9.17301 6,358.97 l
Shoppin
Center
Medical
Office
Building

0.07468 0.07074 0.05619 0.38522 0.00089 0.00078 0.07410 0.07488 0.00073 0.01884 0.01957 — 82.1394 82.1394 0.00466 0.00499 0.12098 83.8645 Conveni
ence
Market
with Gas
Pumps

4.71281 4.46461 3.54625 24.3112 0.05601 0.04929 4.67612 4.72540 0.04637 1.18884 1.23521 — 5,183.76 5,183.76 0.29431 0.31503 7.63479 5,292.63 Fast
Food
Restaurant
with
Drive
Thru

2.57177 2.43633 1.93518 13.2665 0.03056 0.02690 2.55175 2.57864 0.02530 0.64875 0.67405 — 2,828.77 2,828.77 0.16060 0.17191 4.16629 2,888.18 Automo
bile
Care
Center

0.21757 0.20611 0.16371 1.12234 0.00259 0.00228 0.21588 0.21815 0.00214 0.05488 0.05702 — 239.311 239.311 0.01359 0.01454 0.35246 244.337 Unrefrig
erated
Wareho
use-No
Rail

0.02354 0.02230 0.01771 0.12142 0.00028 0.00025 0.02335 0.02360 0.00023 0.00594 0.00617 — 25.8897 25.8897 0.00147 0.00157 0.03813 26.4335 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4

4.2. Energy
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 13 / 63

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 1,305.34 1,305.34 0.21118 0.02560 — 1,318.25 Medical
Office
Building
— — — — — — — — — — — — 119.619 119.619 0.01935 0.00235 — 120.802 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 14.0307 14.0307 0.00227 0.00028 — 14.1694 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 421.294 421.294 0.06816 0.00826 — 425.460 Automo
bile
Care
Center
— — — — — — — — — — — — 27.1845 27.1845 0.00440 0.00053 — 27.4533 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.081 240.081 0.03884 0.00471 — 242.455 Parking
Lot
— — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 14 / 63
Other — — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Asphalt
Surfaces
Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,663.88 2,663.88 0.43096 0.05224 — 2,690.22 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 1,305.34 1,305.34 0.21118 0.02560 — 1,318.25 Medical
Office
Building
— — — — — — — — — — — — 119.619 119.619 0.01935 0.00235 — 120.802 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 14.0307 14.0307 0.00227 0.00028 — 14.1694 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 421.294 421.294 0.06816 0.00826 — 425.460 Automo
bile
Care
Center
— — — — — — — — — — — — 27.1845 27.1845 0.00440 0.00053 — 27.4533 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.081 240.081 0.03884 0.00471 — 242.455 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 15 / 63
Parking — — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 Lot
Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,663.88 2,663.88 0.43096 0.05224 — 2,690.22 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 216.114 216.114 0.03496 0.00424 — 218.251 Medical
Office
Building
— — — — — — — — — — — — 19.8043 19.8043 0.00320 0.00039 — 20.0001 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 2.32294 2.32294 0.00038 0.00005 — 2.34591 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 69.7501 69.7501 0.01128 0.00137 — 70.4397 Automo
bile
Care
Center
— — — — — — — — — — — — 4.50070 4.50070 0.00073 0.00009 — 4.54520 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 39.7482 39.7482 0.00643 0.00078 — 40.1412 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 16 / 63
Parking
Lot
— — — — — — — — — — — — 88.7953 88.7953 0.01437 0.00174 — 89.6734 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 441.035 441.035 0.07135 0.00865 — 445.396

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 Fast
Food
Restaurant
with
Drive
Thru

0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 17 / 63
Automo 0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 bile
Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 Fast
Food
Restaurant
with
Drive
Thru

0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 18 / 63
Automo
Care
Center

0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.01769 0.00884 0.16081 0.13508 0.00096 0.01222 — 0.01222 0.01222 — 0.01222 — 174.061 174.061 0.01540 0.00033 — 174.544 Medical
Office
Building

0.00197 0.00098 0.01787 0.01501 0.00011 0.00136 — 0.00136 0.00136 — 0.00136 — 19.3459 19.3459 0.00171 0.00004 — 19.3995 Conveni
ence
Market
with Gas
Pumps

0.00008 0.00004 0.00070 0.00059 <

0.000005

0.00005 — 0.00005 0.00005 — 0.00005 — 0.75758 0.75758 0.00007 <

0.000005
— 0.75968
Fast
Food
Restaurant
with
Drive
Thru

0.01137 0.00569 0.10340 0.08686 0.00062 0.00786 — 0.00786 0.00786 — 0.00786 — 111.927 111.927 0.00991 0.00021 — 112.238 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 19 / 63
Automo 0.00091 0.00045 0.00823 0.00692 0.00005 0.00063 — 0.00063 0.00063 — 0.00063 — 8.91336 8.91336 0.00079 0.00002 — 8.93809 bile
Unrefrig
erated
Wareho
use-No
Rail

0.00115 0.00058 0.01046 0.00879 0.00006 0.00079 — 0.00079 0.00079 — 0.00079 — 11.3212 11.3212 0.00100 0.00002 — 11.3526 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 326.327 326.327 0.02888 0.00061 — 327.232

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.63845 0.63845 — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 20 / 63
Landsca 3.13835 2.89631 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 pe
Equipm
ent
Total 12.5824 12.3404 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.63845 0.63845 — — — — — — — — — — — — — — — —
Total 9.44408 9.44408 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Product
s

1.60703 1.60703 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.11652 0.11652 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent

0.28245 0.26067 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301 Total 2.00600 1.98421 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301

4.4. Water Emissions by Land Use

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 21 / 63
Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 22 / 63
Other — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Non-Asphalt
Surfaces
Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 23 / 63
Other — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Asphalt
Surfaces
Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 24 / 63
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 25 / 63
Automo — — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 bile
Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 26 / 63
Automo
Care
Center
— — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 31.3860 0.00000 31.3860 3.13692 0.00000 — 109.809 Medical
Office
Building
— — — — — — — — — — — 8.79722 0.00000 8.79722 0.87925 0.00000 — 30.7785 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 1.51237 0.00000 1.51237 0.15116 0.00000 — 5.29126 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 17.3401 0.00000 17.3401 1.73308 0.00000 — 60.6671 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 27 / 63
Automo — — — — — — — — — — — 1.39748 0.00000 1.39748 0.13967 0.00000 — 4.88931 bile
Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 3.35495 0.00000 3.35495 0.33532 0.00000 — 11.7378 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.23326 0.23326
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 28 / 63
Conveni — — — — — — — — — — — — — — — — 88.7327 88.7327 ence
Market
with Gas
Pumps
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 26.3737 26.3737
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00640 0.00640
Total — — — — — — — — — — — — — — — — 116.954 116.954
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.23326 0.23326
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 88.7327 88.7327
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 26.3737 26.3737
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 29 / 63
Automo — — — — — — — — — — — — — — — — 0.00640 0.00640
bile
Care
Center
Total — — — — — — — — — — — — — — — — 116.954 116.954
Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 0.26626 0.26626
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.03862 0.03862
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 14.6907 14.6907
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 4.36646 4.36646
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00106 0.00106
Total — — — — — — — — — — — — — — — — 19.3631 19.3631

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 30 / 63
Equipm TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e ent
Type
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 31 / 63

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 32 / 63
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 33 / 63
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 34 / 63
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Regional Shopping
Center
12,162.0 12,113.9 5,009.55 4,063,674 47,868.1 47,678.9 19,717.0 15,994,119 Medical Office
Building
200.600 22.0800 2.73600 53,593.3 789.537 86.9042 10.7686 210,936 Convenience
Market with Gas
Pumps
9,278.36 9,236.50 9,236.50 3,382,236 36,518.5 36,353.7 36,353.7 13,312,064 Fast Food
Restaurant with
Drive Thru
4,917.90 6,613.50 4,193.58 1,845,679 19,356.2 26,029.9 16,505.4 7,264,364 Automobile Care
Center
422.000 442.260 442.260 156,143 1,660.94 1,740.68 1,740.68 614,559 Unrefrigerated
Warehouse-No Rail

47.3200 50.9600 36.4000 16,892.2 186.246 200.572 143.266 66,485.6 Parking Lot 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

5.10. Operational Area Sources

5.10.1. Hearths
Land Use Hearth Type Unmitigated (number) Mitigated (number) Regional Shopping Center Wood Fireplaces 0 0
Regional Shopping Center Gas Fireplaces 0 0
Regional Shopping Center Propane Fireplaces 0 0
Regional Shopping Center Electric Fireplaces 0 0
Regional Shopping Center No Fireplaces 0 0
Regional Shopping Center Conventional Wood Stoves 0 0
Regional Shopping Center Catalytic Wood Stoves 0 0
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 35 / 63
Regional Shopping Center Non-Catalytic Wood Stoves 0 0
Regional Shopping Center Pellet Wood Stoves 0 0
Medical Office Building Wood Fireplaces 0 0
Medical Office Building Gas Fireplaces 0 0
Medical Office Building Propane Fireplaces 0 0
Medical Office Building Electric Fireplaces 0 0
Medical Office Building No Fireplaces 0 0
Medical Office Building Conventional Wood Stoves 0 0
Medical Office Building Catalytic Wood Stoves 0 0
Medical Office Building Non-Catalytic Wood Stoves 0 0
Medical Office Building Pellet Wood Stoves 0 0
Convenience Market with Gas Pumps Wood Fireplaces 0 0
Convenience Market with Gas Pumps Gas Fireplaces 0 0
Convenience Market with Gas Pumps Propane Fireplaces 0 0 Convenience Market with Gas Pumps Electric Fireplaces 0 0 Convenience Market with Gas Pumps No Fireplaces 0 0
Convenience Market with Gas Pumps Conventional Wood Stoves 0 0 Convenience Market with Gas Pumps Catalytic Wood Stoves 0 0 Convenience Market with Gas Pumps Non-Catalytic Wood Stoves 0 0 Convenience Market with Gas Pumps Pellet Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Wood Fireplaces 0 0 Fast Food Restaurant with Drive Thru Gas Fireplaces 0 0 Fast Food Restaurant with Drive Thru Propane Fireplaces 0 0 Fast Food Restaurant with Drive Thru Electric Fireplaces 0 0 Fast Food Restaurant with Drive Thru No Fireplaces 0 0
Fast Food Restaurant with Drive Thru Conventional Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Catalytic Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Non-Catalytic Wood Stoves 0 0 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 36 / 63
Fast Food Restaurant with Drive Thru Pellet Wood Stoves 0 0 Automobile Care Center Wood Fireplaces 0 0
Automobile Care Center Gas Fireplaces 0 0
Automobile Care Center Propane Fireplaces 0 0
Automobile Care Center Electric Fireplaces 0 0
Automobile Care Center No Fireplaces 0 0
Automobile Care Center Conventional Wood Stoves 0 0
Automobile Care Center Catalytic Wood Stoves 0 0
Automobile Care Center Non-Catalytic Wood Stoves 0 0
Automobile Care Center Pellet Wood Stoves 0 0
Unrefrigerated Warehouse-No Rail Wood Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Gas Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Propane Fireplaces 0 0 Unrefrigerated Warehouse-No Rail Electric Fireplaces 0 0 Unrefrigerated Warehouse-No Rail No Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Conventional Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Catalytic Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Non-Catalytic Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Pellet Wood Stoves 0 0 Parking Lot Wood Fireplaces 0 0
Parking Lot Gas Fireplaces 0 0
Parking Lot Propane Fireplaces 0 0
Parking Lot Electric Fireplaces 0 0
Parking Lot No Fireplaces 0 0
Parking Lot Conventional Wood Stoves 0 0
Parking Lot Catalytic Wood Stoves 0 0
Parking Lot Non-Catalytic Wood Stoves 0 0
Parking Lot Pellet Wood Stoves 0 0
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 37 / 63
Other Asphalt Surfaces Wood Fireplaces 0 0
Other Asphalt Surfaces Gas Fireplaces 0 0
Other Asphalt Surfaces Propane Fireplaces 0 0
Other Asphalt Surfaces Electric Fireplaces 0 0
Other Asphalt Surfaces No Fireplaces 0 0
Other Asphalt Surfaces Conventional Wood Stoves 0 0
Other Asphalt Surfaces Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Non-Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Pellet Wood Stoves 0 0
Other Non-Asphalt Surfaces Wood Fireplaces 0 0
Other Non-Asphalt Surfaces Gas Fireplaces 0 0
Other Non-Asphalt Surfaces Propane Fireplaces 0 0
Other Non-Asphalt Surfaces Electric Fireplaces 0 0
Other Non-Asphalt Surfaces No Fireplaces 0 0
Other Non-Asphalt Surfaces Conventional Wood Stoves 0 0 Other Non-Asphalt Surfaces Catalytic Wood Stoves 0 0
Other Non-Asphalt Surfaces Non-Catalytic Wood Stoves 0 0 Other Non-Asphalt Surfaces Pellet Wood Stoves 0 0

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)

0.00000 0.00000 608,297 202,766 97,091.8

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00000
Summer Days day/yr 180.000
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 38 / 63

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Regional Shopping Center 2,335,726 203.983 0.0330 0.0040 3,280,464 Medical Office Building 214,042 203.983 0.0330 0.0040 364,604 Convenience Market with Gas
Pumps
25,106.0 203.983 0.0330 0.0040 14,277.8
Fast Food Restaurant with
Drive Thru
753,849 203.983 0.0330 0.0040 2,109,444
Automobile Care Center 48,642.9 203.983 0.0330 0.0040 167,987 Unrefrigerated Warehouse-No
Rail
429,593 203.983 0.0330 0.0040 213,366
Parking Lot 959,688 203.983 0.0330 0.0040 0.00000
Other Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000 Other Non-Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Regional Shopping Center 54,357,625 0.00000
Medical Office Building 0.00000 0.00000
Convenience Market with Gas Pumps 0.00000 0.00000
Fast Food Restaurant with Drive Thru 0.00000 0.00000
Automobile Care Center 0.00000 0.00000
Unrefrigerated Warehouse-No Rail 0.00000 0.00000
Parking Lot 0.00000 0.00000
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 39 / 63
Other Asphalt Surfaces 0.00000 0.00000
Other Non-Asphalt Surfaces 0.00000 0.00000

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Regional Shopping Center 351.753 0.00000
Medical Office Building 98.5932 0.00000
Convenience Market with Gas Pumps 16.9496 0.00000
Fast Food Restaurant with Drive Thru 194.336 0.00000
Automobile Care Center 15.6620 0.00000
Unrefrigerated Warehouse-No Rail 37.6000 0.00000
Parking Lot 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
Other Non-Asphalt Surfaces 0.00000 0.00000

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Regional Shopping
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Regional Shopping
Center
Stand-alone retail
refrigerators and
freezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
Medical Office
Building
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.45455 0.60000 0.00000 1.000000
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 40 / 63
Medical Office R-410A 2,088.00 0.00230 4.00000 4.00000 18.0000 Building
Other commercial A/C
and heat pumps
Convenience Market
with Gas Pumps
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Convenience Market
with Gas Pumps
Supermarket
refrigeration and
condensing units
R-404A 3,922.00 26.5200 16.5000 16.5000 18.0000
Fast Food Restaurant
with Drive Thru
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Fast Food Restaurant
with Drive Thru
Other commercial A/C
and heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Fast Food Restaurant
with Drive Thru
Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Automobile Care
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 41 / 63
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 20.0600 annual days of extreme heat Extreme Precipitation 0.00000 annual days with precipitation above 20 mm Sea Level Rise — meters of inundation depth
Wildfire 0.00000 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events. Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 42 / 63
Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 0 0 0 N/A
Drought 0 0 0 N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise N/A N/A N/A N/A
Wildfire N/A N/A N/A N/A
Flooding 1 1 1 2
Drought 1 1 1 2
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 43 / 63
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 93.6279
AQ-PM 99.3155
AQ-DPM 54.8102
Drinking Water 72.9986
Lead Risk Housing 7.14556
Pesticides 0.00000
Toxic Releases 39.1223
Traffic 67.1875
Effect Indicators —
CleanUp Sites 27.4916
Groundwater 59.6048
Haz Waste Facilities/Generators 53.5142
Impaired Water Bodies 0.00000
Solid Waste 0.00000
Sensitive Population —
Asthma 21.0867
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 44 / 63
Cardio-vascular 30.7951
Low Birth Weights 28.0729
Socioeconomic Factor Indicators —
Education 29.6760
Housing 15.5006
Linguistic 21.4237
Poverty 22.0101
Unemployment 67.4779

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 74.07930194
Employed 65.05838573
Median HI 66.79070961
Education —
Bachelor's or higher 57.08969588
High school enrollment 100
Preschool enrollment 17.9006801
Transportation —
Auto Access 52.9449506
Active commuting 56.70473502
Social —
2-parent households 19.17105094
Voting 67.22699859
Neighborhood —
Alcohol availability 71.87219299
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 45 / 63
Park access 52.55998973
Retail density 27.37071731
Supermarket access 19.78698832
Tree canopy 9.187732581
Housing —
Homeownership 39.93327345
Housing habitability 84.98652637
Low-inc homeowner severe housing cost burden 93.301681
Low-inc renter severe housing cost burden 84.08828436
Uncrowded housing 70.21686129
Health Outcomes —
Insured adults 92.01847812
Arthritis 31.2
Asthma ER Admissions 73.6
High Blood Pressure 29.0
Cancer (excluding skin) 16.1
Asthma 51.9
Coronary Heart Disease 37.1
Chronic Obstructive Pulmonary Disease 50.7
Diagnosed Diabetes 80.8
Life Expectancy at Birth 53.0
Cognitively Disabled 66.4
Physically Disabled 26.6
Heart Attack ER Admissions 46.6
Mental Health Not Good 60.0
Chronic Kidney Disease 45.1
Obesity 52.4
Pedestrian Injuries 74.9
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 46 / 63
Physical Health Not Good 65.0
Stroke 45.2
Health Risk Behaviors —
Binge Drinking 11.3
Current Smoker 53.5
No Leisure Time for Physical Activity 58.6
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 53.3
Elderly 40.9
English Speaking 76.1
Foreign-born 16.0
Outdoor Workers 46.6
Climate Change Adaptive Capacity —
Impervious Surface Cover 59.7
Traffic Density 56.7
Traffic Access 0.0
Other Indices —
Hardship 35.5
Other Decision Support —
2016 Voting 53.7

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 30.0000 Healthy Places Index Score for Project Location (b) 57.0000 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 47 / 63
Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data

8.1. Justifications
Screen Justification
Land Use Based on information provided.

Operations: Vehicle Data Based on information provided by the project traffic consultant.

Operations: Fleet Mix Based on information provided by the traffic consultant.

Operations: Energy Use The anticipated 1,201,933 kWh/yr of renewable electricity generated from onsite PV system is subtracted from the Title 24 electricity default total.

Operations: Water and Waste Water Based on the Water Supply and Demand Analysis Coffee and Rosedale Commercial Retail Development Project study prepared by PlaceWorks. For purposes of modeling, all of the project water demand is assigned to the Regional Shopping Center land use.

8.3. Land Use
Model Parameter Units Default Value New Value
Lot Area acre 7.69061 7.39000
Landscape Area sq. ft — 379,446
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 48 / 63
Special Landscape Area sq. ft — 0.00000
Lot Area acre 0.12964 0.01000
Building Area sq. ft 5,647.00 428.000
Landscape Area sq. ft — 0.00000
Lot Area acre 0.01800 25.1500
Landscape Area sq. ft — 0.00000

8.5. Operations

8.5.1. Mobile Sources

8.5.1.1. Vehicle Data
Land Use Model Parameter Units Default Value New Value
Regional Shopping Center Weekday Trip Rate size/day 37.7500 36.3042 Regional Shopping Center Saturday Trip Rate size/day 46.1200 36.1606 Regional Shopping Center Sunday Trip Rate size/day 21.1000 14.9537 Regional Shopping Center Non-Res H-W Trip Length miles 8.50253 3.93588 Regional Shopping Center Non-Res W-O Trip Length miles 4.80598 0.00000 Regional Shopping Center Non-Res O-O Trip Length miles 5.08225 0.00000 Regional Shopping Center Weekday Primary Trip % 37.9200 100.0000 Regional Shopping Center Weekday Divert Trip % 28.0800 0.00000 Regional Shopping Center Weekday Pass-By Trip % 34.0000 0.00000 Regional Shopping Center Saturday Primary Trip % 42.5100 100.0000 Regional Shopping Center Saturday Divert Trip % 31.4900 0.00000 Regional Shopping Center Saturday Pass-By Trip % 26.0000 0.00000 Regional Shopping Center Sunday Primary Trip % 42.5100 100.0000 Regional Shopping Center Sunday Divert Trip % 31.4900 0.00000 Regional Shopping Center Sunday Pass-By Trip % 26.0000 0.00000 Regional Shopping Center Non-Res H-W Trip % 31.7132 100.0000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 49 / 63
Regional Shopping Center Non-Res W-O Trip% 14.8513 0.00000 Regional Shopping Center Non-Res O-O Trip% 53.4356 0.00000 Medical Office Building Weekday Trip Rate size/day 34.8000 21.9739 Medical Office Building Saturday Trip Rate size/day 8.57000 2.41867 Medical Office Building Sunday Trip Rate size/day 1.42000 0.29970 Medical Office Building Non-Res H-W Trip Length miles 8.50253 3.93588 Medical Office Building Non-Res W-O Trip Length miles 4.80598 0.00000 Medical Office Building Non-Res O-O Trip Length miles 5.08225 0.00000 Medical Office Building Non-Res H-W Trip% 31.7132 100.0000 Medical Office Building Non-Res W-O Trip% 14.8513 0.00000 Medical Office Building Non-Res O-O Trip% 53.4356 0.00000 Convenience Market with Gas
Pumps
Weekday Trip Rate size/day 322.500 231.959
Convenience Market with Gas
Pumps
Saturday Trip Rate size/day 322.500 230.912
Convenience Market with Gas
Pumps
Sunday Trip Rate size/day 322.500 230.912
Convenience Market with Gas
Pumps
Non-Res H-W Trip Length miles 8.50253 3.93588
Convenience Market with Gas
Pumps
Non-Res W-O Trip Length miles 4.80598 0.00000
Convenience Market with Gas
Pumps
Non-Res O-O Trip Length miles 5.08225 0.00000
Convenience Market with Gas
Pumps
Weekday Primary Trip% 14.2400 100.0000
Convenience Market with Gas
Pumps
Weekday Divert Trip% 21.2600 0.00000
Convenience Market with Gas
Pumps
Weekday Pass-By Trip% 64.5000 0.00000
Convenience Market with Gas
Pumps
Non-Res H-W Trip% 31.7132 100.0000
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 50 / 63
Convenience Market with Gas Non-Res W-O Trip % 14.8513 0.00000 Pumps
Convenience Market with Gas
Pumps
Non-Res O-O Trip % 53.4356 0.00000
Fast Food Restaurant with Drive
Thru
Weekday Trip Rate size/day 470.950 291.500
Fast Food Restaurant with Drive
Thru
Saturday Trip Rate size/day 616.120 392.004
Fast Food Restaurant with Drive
Thru
Sunday Trip Rate size/day 472.580 248.567
Fast Food Restaurant with Drive
Thru
Non-Res H-W Trip Length miles 8.50253 3.93588
Fast Food Restaurant with Drive
Thru
Non-Res W-O Trip Length miles 4.80598 0.00000
Fast Food Restaurant with Drive
Thru
Non-Res O-O Trip Length miles 5.08225 0.00000
Fast Food Restaurant with Drive
Thru
Weekday Primary Trip % 26.5000 100.0000
Fast Food Restaurant with Drive
Thru
Weekday Divert Trip % 24.0000 0.00000
Fast Food Restaurant with Drive
Thru
Weekday Pass-By Trip % 49.5000 0.00000
Fast Food Restaurant with Drive
Thru
Non-Res H-W Trip % 31.7132 100.0000
Fast Food Restaurant with Drive
Thru
Non-Res W-O Trip % 14.8513 0.00000
Fast Food Restaurant with Drive
Thru
Non-Res O-O Trip % 53.4356 0.00000
Automobile Care Center Weekday Trip Rate size/day 23.7200 102.927 Automobile Care Center Saturday Trip Rate size/day 23.7200 107.868 Automobile Care Center Sunday Trip Rate size/day 11.8800 107.868 Automobile Care Center Non-Res H-W Trip Length miles 8.50253 3.93588 Automobile Care Center Non-Res W-O Trip Length miles 4.80598 0.00000 Automobile Care Center Non-Res O-O Trip Length miles 5.08225 0.00000 LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 51 / 63
Automobile Care Center Weekday Primary Trip % 53.3000 100.0000 Automobile Care Center Weekday Divert Trip % 11.2000 0.00000 Automobile Care Center Weekday Pass-By Trip % 35.5000 0.00000 Automobile Care Center Non-Res H-W Trip % 31.7132 100.0000 Automobile Care Center Non-Res W-O Trip % 14.8513 0.00000 Automobile Care Center Non-Res O-O Trip % 53.4356 0.00000 Unrefrigerated Warehouse-No Rail Weekday Trip Rate size/day 1.74000 1.18300 Unrefrigerated Warehouse-No Rail Saturday Trip Rate size/day 1.74000 1.27400 Unrefrigerated Warehouse-No Rail Sunday Trip Rate size/day 1.74000 0.91000 Unrefrigerated Warehouse-No Rail Non-Res H-W Trip Length miles 8.50253 3.93588 Unrefrigerated Warehouse-No Rail Non-Res W-O Trip Length miles 4.80598 0.00000 Unrefrigerated Warehouse-No Rail Non-Res O-O Trip Length miles 5.08225 0.00000 Unrefrigerated Warehouse-No Rail Non-Res H-W Trip % 31.7132 100.0000 Unrefrigerated Warehouse-No Rail Non-Res W-O Trip % 14.8513 0.00000 Unrefrigerated Warehouse-No Rail Non-Res O-O Trip % 53.4356 0.00000 Parking Lot Non-Res H-W Trip % 31.7132 100.0000
Parking Lot Non-Res W-O Trip % 14.8513 0.00000
Parking Lot Non-Res O-O Trip % 53.4356 0.00000
Other Asphalt Surfaces Non-Res H-W Trip % 31.7132 100.0000 Other Asphalt Surfaces Non-Res W-O Trip % 14.8513 0.00000 Other Asphalt Surfaces Non-Res O-O Trip % 53.4356 0.00000 Other Non-Asphalt Surfaces Non-Res H-W Trip % 31.7132 100.0000 Other Non-Asphalt Surfaces Non-Res W-O Trip % 14.8513 0.00000 Other Non-Asphalt Surfaces Non-Res O-O Trip % 53.4356 0.00000

8.5.1.2. Fleet Mix
Land Use Season Model Parameter Units Default Value New Value Regional Shopping Center A Heavy-Heavy-Duty Trucks % 4% 1% LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 52 / 63
Regional Shopping Center A Passenger Cars % 43% 43%
Regional Shopping Center A Light-Duty Trucks 1 % 4% 4%
Regional Shopping Center A Light-Duty Trucks 2 % 22% 22% Regional Shopping Center A Light Heavy-Duty Trucks 1 % 3% 5% Regional Shopping Center A Light Heavy-Duty Trucks 2 % 1% 2% Regional Shopping Center A Motorcycles % 2% 2%
Regional Shopping Center A Medium-Duty Trucks % 19% 19% Regional Shopping Center A Motor Homes % < 0.5% 0%
Regional Shopping Center A Medium-Heavy-Duty Trucks % 2% 3% Regional Shopping Center A Other Buses % < 0.5% 0%
Regional Shopping Center A School Buses % < 0.5% 0%
Regional Shopping Center A Urban Buses % < 0.5% 0%
Regional Shopping Center S Heavy-Heavy-Duty Trucks % 4% 1% Regional Shopping Center S Passenger Cars % 43% 43%
Regional Shopping Center S Light-Duty Trucks 1 % 4% 4%
Regional Shopping Center S Light-Duty Trucks 2 % 22% 22% Regional Shopping Center S Light Heavy-Duty Trucks 1 % 3% 5% Regional Shopping Center S Light Heavy-Duty Trucks 2 % 1% 2% Regional Shopping Center S Motorcycles % 2% 2%
Regional Shopping Center S Medium-Duty Trucks % 19% 19% Regional Shopping Center S Motor Homes % < 0.5% 0%
Regional Shopping Center S Medium-Heavy-Duty Trucks % 2% 3% Regional Shopping Center S Other Buses % < 0.5% 0%
Regional Shopping Center S School Buses % < 0.5% 0%
Regional Shopping Center S Urban Buses % < 0.5% 0%
Regional Shopping Center W Heavy-Heavy-Duty Trucks % 4% 1% Regional Shopping Center W Passenger Cars % 43% 43%
Regional Shopping Center W Light-Duty Trucks 1 % 4% 4%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 53 / 63
Regional Shopping Center W Light-Duty Trucks 2 % 22% 22% Regional Shopping Center W Light Heavy-Duty Trucks 1 % 3% 5% Regional Shopping Center W Light Heavy-Duty Trucks 2 % 1% 2% Regional Shopping Center W Motorcycles % 2% 2%
Regional Shopping Center W Medium-Duty Trucks % 19% 19% Regional Shopping Center W Motor Homes % < 0.5% 0%
Regional Shopping Center W Medium-Heavy-Duty Trucks % 2% 3% Regional Shopping Center W Other Buses % < 0.5% 0%
Regional Shopping Center W School Buses % < 0.5% 0%
Regional Shopping Center W Urban Buses % < 0.5% 0%
Medical Office Building A Heavy-Heavy-Duty Trucks % 4% 1% Medical Office Building A Passenger Cars % 43% 43%
Medical Office Building A Light-Duty Trucks 1 % 4% 4%
Medical Office Building A Light-Duty Trucks 2 % 22% 22% Medical Office Building A Light Heavy-Duty Trucks 1 % 3% 5% Medical Office Building A Light Heavy-Duty Trucks 2 % 1% 2% Medical Office Building A Motorcycles % 2% 2%
Medical Office Building A Medium-Duty Trucks % 19% 19%
Medical Office Building A Motor Homes % < 0.5% 0%
Medical Office Building A Medium-Heavy-Duty Trucks % 2% 3% Medical Office Building A Other Buses % < 0.5% 0%
Medical Office Building A School Buses % < 0.5% 0%
Medical Office Building A Urban Buses % < 0.5% 0%
Medical Office Building S Heavy-Heavy-Duty Trucks % 4% 1% Medical Office Building S Passenger Cars % 43% 43%
Medical Office Building S Light-Duty Trucks 1 % 4% 4%
Medical Office Building S Light-Duty Trucks 2 % 22% 22% Medical Office Building S Light Heavy-Duty Trucks 1 % 3% 5% LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 54 / 63
Medical Office Building S Light Heavy-Duty Trucks 2 % 1% 2% Medical Office Building S Motorcycles% 2% 2%
Medical Office Building S Medium-Duty Trucks% 19% 19%
Medical Office Building S Motor Homes% < 0.5% 0%
Medical Office Building S Medium-Heavy-Duty Trucks % 2% 3% Medical Office Building S Other Buses% < 0.5% 0%
Medical Office Building S School Buses% < 0.5% 0%
Medical Office Building S Urban Buses% < 0.5% 0%
Medical Office Building W Heavy-Heavy-Duty Trucks % 4% 1% Medical Office Building W Passenger Cars% 43% 43%
Medical Office Building W Light-Duty Trucks 1% 4% 4%
Medical Office Building W Light-Duty Trucks 2% 22% 22%
Medical Office Building W Light Heavy-Duty Trucks 1 % 3% 5% Medical Office Building W Light Heavy-Duty Trucks 2 % 1% 2% Medical Office Building W Motorcycles% 2% 2%
Medical Office Building W Medium-Duty Trucks% 19% 19%
Medical Office Building W Motor Homes% < 0.5% 0%
Medical Office Building W Medium-Heavy-Duty Trucks % 2% 3% Medical Office Building W Other Buses% < 0.5% 0%
Medical Office Building W School Buses% < 0.5% 0%
Medical Office Building W Urban Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
A Heavy-Heavy-Duty Trucks % 4% 1%
Convenience Market with Gas
Pumps
A Passenger Cars% 43% 43%
Convenience Market with Gas
Pumps
A Light-Duty Trucks 1% 4% 4%
Convenience Market with Gas
Pumps
A Light-Duty Trucks 2% 22% 22%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 55 / 63
Convenience Market with GasA Light Heavy-Duty Trucks 1% 3% 5% Pumps
Convenience Market with Gas
Pumps
A Light Heavy-Duty Trucks 2 % 1% 2%
Convenience Market with Gas
Pumps
A Motorcycles% 2% 2%
Convenience Market with Gas
Pumps
A Medium-Duty Trucks% 19% 19%
Convenience Market with Gas
Pumps
A Motor Homes% < 0.5% 0%
Convenience Market with Gas
Pumps
A Medium-Heavy-Duty Trucks % 2% 3%
Convenience Market with Gas
Pumps
A Other Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
A School Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
A Urban Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
S Heavy-Heavy-Duty Trucks % 4% 1%
Convenience Market with Gas
Pumps
S Passenger Cars% 43% 43%
Convenience Market with Gas
Pumps
S Light-Duty Trucks 1% 4% 4%
Convenience Market with Gas
Pumps
S Light-Duty Trucks 2% 22% 22%
Convenience Market with Gas
Pumps
S Light Heavy-Duty Trucks 1 % 3% 5%
Convenience Market with Gas
Pumps
S Light Heavy-Duty Trucks 2 % 1% 2%
Convenience Market with Gas
Pumps
S Motorcycles% 2% 2%
Convenience Market with Gas
Pumps
S Medium-Duty Trucks% 19% 19%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 56 / 63
Convenience Market with GasS Motor Homes% < 0.5% 0%
Pumps
Convenience Market with Gas
Pumps
S Medium-Heavy-Duty Trucks % 2% 3%
Convenience Market with Gas
Pumps
S Other Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
S School Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
S Urban Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
W Heavy-Heavy-Duty Trucks % 4% 1%
Convenience Market with Gas
Pumps
W Passenger Cars% 43% 43%
Convenience Market with Gas
Pumps
W Light-Duty Trucks 1% 4% 4%
Convenience Market with Gas
Pumps
W Light-Duty Trucks 2% 22% 22%
Convenience Market with Gas
Pumps
W Light Heavy-Duty Trucks 1 % 3% 5%
Convenience Market with Gas
Pumps
W Light Heavy-Duty Trucks 2 % 1% 2%
Convenience Market with Gas
Pumps
W Motorcycles% 2% 2%
Convenience Market with Gas
Pumps
W Medium-Duty Trucks% 19% 19%
Convenience Market with Gas
Pumps
W Motor Homes% < 0.5% 0%
Convenience Market with Gas
Pumps
W Medium-Heavy-Duty Trucks % 2% 3%
Convenience Market with Gas
Pumps
W Other Buses% < 0.5% 0%
Convenience Market with Gas
Pumps
W School Buses% < 0.5% 0%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 57 / 63
Convenience Market with GasW Urban Buses% < 0.5% 0%
Pumps
Fast Food Restaurant with
Drive Thru
A Heavy-Heavy-Duty Trucks % 4% 1%
Fast Food Restaurant with
Drive Thru
A Passenger Cars% 43% 43%
Fast Food Restaurant with
Drive Thru
A Light-Duty Trucks 1% 4% 4%
Fast Food Restaurant with
Drive Thru
A Light-Duty Trucks 2% 22% 22%
Fast Food Restaurant with
Drive Thru
A Light Heavy-Duty Trucks 1 % 3% 5%
Fast Food Restaurant with
Drive Thru
A Light Heavy-Duty Trucks 2 % 1% 2%
Fast Food Restaurant with
Drive Thru
A Motorcycles% 2% 2%
Fast Food Restaurant with
Drive Thru
A Medium-Duty Trucks% 19% 19%
Fast Food Restaurant with
Drive Thru
A Motor Homes% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
A Medium-Heavy-Duty Trucks % 2% 3%
Fast Food Restaurant with
Drive Thru
A Other Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
A School Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
A Urban Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
S Heavy-Heavy-Duty Trucks % 4% 1%
Fast Food Restaurant with
Drive Thru
S Passenger Cars% 43% 43%
Fast Food Restaurant with
Drive Thru
S Light-Duty Trucks 1% 4% 4%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 58 / 63
Fast Food Restaurant withS Light-Duty Trucks 2% 22% 22% Drive Thru
Fast Food Restaurant with
Drive Thru
S Light Heavy-Duty Trucks 1 % 3% 5%
Fast Food Restaurant with
Drive Thru
S Light Heavy-Duty Trucks 2 % 1% 2%
Fast Food Restaurant with
Drive Thru
S Motorcycles% 2% 2%
Fast Food Restaurant with
Drive Thru
S Medium-Duty Trucks% 19% 19%
Fast Food Restaurant with
Drive Thru
S Motor Homes% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
S Medium-Heavy-Duty Trucks % 2% 3%
Fast Food Restaurant with
Drive Thru
S Other Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
S School Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
S Urban Buses% < 0.5% 0%
Fast Food Restaurant with
Drive Thru
W Heavy-Heavy-Duty Trucks % 4% 1%
Fast Food Restaurant with
Drive Thru
W Passenger Cars% 43% 43%
Fast Food Restaurant with
Drive Thru
W Light-Duty Trucks 1% 4% 4%
Fast Food Restaurant with
Drive Thru
W Light-Duty Trucks 2% 22% 22%
Fast Food Restaurant with
Drive Thru
W Light Heavy-Duty Trucks 1 % 3% 5%
Fast Food Restaurant with
Drive Thru
W Light Heavy-Duty Trucks 2 % 1% 2%
Fast Food Restaurant with
Drive Thru
W Motorcycles% 2% 2%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 59 / 63
Fast Food Restaurant with W Medium-Duty Trucks % 19% 19% Drive Thru
Fast Food Restaurant with
Drive Thru
W Motor Homes % < 0.5% 0%
Fast Food Restaurant with
Drive Thru
W Medium-Heavy-Duty Trucks % 2% 3%
Fast Food Restaurant with
Drive Thru
W Other Buses % < 0.5% 0%
Fast Food Restaurant with
Drive Thru
W School Buses % < 0.5% 0%
Fast Food Restaurant with
Drive Thru
W Urban Buses % < 0.5% 0%
Automobile Care Center A Heavy-Heavy-Duty Trucks % 4% 1% Automobile Care Center A Passenger Cars % 43% 43%
Automobile Care Center A Light-Duty Trucks 1 % 4% 4%
Automobile Care Center A Light-Duty Trucks 2 % 22% 22%
Automobile Care Center A Light Heavy-Duty Trucks 1 % 3% 5% Automobile Care Center A Light Heavy-Duty Trucks 2 % 1% 2% Automobile Care Center A Motorcycles % 2% 2%
Automobile Care Center A Medium-Duty Trucks % 19% 19%
Automobile Care Center A Motor Homes % < 0.5% 0%
Automobile Care Center A Medium-Heavy-Duty Trucks % 2% 3% Automobile Care Center A Other Buses % < 0.5% 0%
Automobile Care Center A School Buses % < 0.5% 0%
Automobile Care Center A Urban Buses % < 0.5% 0%
Automobile Care Center S Heavy-Heavy-Duty Trucks % 4% 1% Automobile Care Center S Passenger Cars % 43% 43%
Automobile Care Center S Light-Duty Trucks 1 % 4% 4%
Automobile Care Center S Light-Duty Trucks 2 % 22% 22%
Automobile Care Center S Light Heavy-Duty Trucks 1 % 3% 5% Automobile Care Center S Light Heavy-Duty Trucks 2 % 1% 2% LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 60 / 63
Automobile Care Center S Motorcycles % 2% 2%
Automobile Care Center S Medium-Duty Trucks % 19% 19%
Automobile Care Center S Motor Homes % < 0.5% 0%
Automobile Care Center S Medium-Heavy-Duty Trucks % 2% 3% Automobile Care Center S Other Buses % < 0.5% 0%
Automobile Care Center S School Buses % < 0.5% 0%
Automobile Care Center S Urban Buses % < 0.5% 0%
Automobile Care Center W Heavy-Heavy-Duty Trucks % 4% 1% Automobile Care Center W Passenger Cars % 43% 43%
Automobile Care Center W Light-Duty Trucks 1 % 4% 4%
Automobile Care Center W Light-Duty Trucks 2 % 22% 22%
Automobile Care Center W Light Heavy-Duty Trucks 1 % 3% 5% Automobile Care Center W Light Heavy-Duty Trucks 2 % 1% 2% Automobile Care Center W Motorcycles % 2% 2%
Automobile Care Center W Medium-Duty Trucks % 19% 19%
Automobile Care Center W Motor Homes % < 0.5% 0%
Automobile Care Center W Medium-Heavy-Duty Trucks % 2% 3% Automobile Care Center W Other Buses % < 0.5% 0%
Automobile Care Center W School Buses % < 0.5% 0%
Automobile Care Center W Urban Buses % < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
A Heavy-Heavy-Duty Trucks % 4% 1%
Unrefrigerated Warehouse-No
Rail
A Passenger Cars % 43% 43%
Unrefrigerated Warehouse-No
Rail
A Light-Duty Trucks 1 % 4% 4%
Unrefrigerated Warehouse-No
Rail
A Light-Duty Trucks 2 % 22% 22%
Unrefrigerated Warehouse-No
Rail
A Light Heavy-Duty Trucks 1 % 3% 5%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 61 / 63
Unrefrigerated Warehouse-No
Rail
A Light Heavy-Duty Trucks 2 % 1% 2%
Unrefrigerated Warehouse-No
Rail
A Motorcycles% 2% 2%
Unrefrigerated Warehouse-No
Rail
A Medium-Duty Trucks% 19% 19%
Unrefrigerated Warehouse-No
Rail
A Motor Homes% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
A Medium-Heavy-Duty Trucks % 2% 3%
Unrefrigerated Warehouse-No
Rail
A Other Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
A School Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
A Urban Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
S Heavy-Heavy-Duty Trucks % 4% 1%
Unrefrigerated Warehouse-No
Rail
S Passenger Cars% 43% 43%
Unrefrigerated Warehouse-No
Rail
S Light-Duty Trucks 1% 4% 4%
Unrefrigerated Warehouse-No
Rail
S Light-Duty Trucks 2% 22% 22%
Unrefrigerated Warehouse-No
Rail
S Light Heavy-Duty Trucks 1 % 3% 5%
Unrefrigerated Warehouse-No
Rail
S Light Heavy-Duty Trucks 2 % 1% 2%
Unrefrigerated Warehouse-No
Rail
S Motorcycles% 2% 2%
Unrefrigerated Warehouse-No
Rail
S Medium-Duty Trucks% 19% 19%
Unrefrigerated Warehouse-No
Rail
S Motor Homes% < 0.5% 0%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 62 / 63
Unrefrigerated Warehouse-NoS Medium-Heavy-Duty Trucks% 2% 3% Rail
Unrefrigerated Warehouse-No
Rail
S Other Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
S School Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
S Urban Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
W Heavy-Heavy-Duty Trucks % 4% 1%
Unrefrigerated Warehouse-No
Rail
W Passenger Cars% 43% 43%
Unrefrigerated Warehouse-No
Rail
W Light-Duty Trucks 1% 4% 4%
Unrefrigerated Warehouse-No
Rail
W Light-Duty Trucks 2% 22% 22%
Unrefrigerated Warehouse-No
Rail
W Light Heavy-Duty Trucks 1 % 3% 5%
Unrefrigerated Warehouse-No
Rail
W Light Heavy-Duty Trucks 2 % 1% 2%
Unrefrigerated Warehouse-No
Rail
W Motorcycles% 2% 2%
Unrefrigerated Warehouse-No
Rail
W Medium-Duty Trucks% 19% 19%
Unrefrigerated Warehouse-No
Rail
W Motor Homes% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
W Medium-Heavy-Duty Trucks % 2% 3%
Unrefrigerated Warehouse-No
Rail
W Other Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
W School Buses% < 0.5% 0%
Unrefrigerated Warehouse-No
Rail
W Urban Buses% < 0.5% 0%
LOKH-01_Operation Full Buildout Detailed Report, 4/10/2026 63 / 63

8.5.3. Energy Usage
Land Use Model Parameter Units Default Value New Value
Regional Shopping Center Electricity kWh/yr 3,537,659 2,335,726 Regional Shopping Center Electricity (Subject to Title 24) kWh/yr 2,732,418 1,530,485

8.5.4. Water and Waste Water
Land Use Model Parameter Units Default Value New Value
Regional Shopping Center Indoor Water gal/year 24,814,517 54,357,625 Regional Shopping Center Outdoor Water gal/year 6,188,637 0.00000 Medical Office Building Indoor Water gal/year 1,145,512 0.00000 Convenience Market with Gas
Pumps
Indoor Water gal/year 418,287 0.00000
Fast Food Restaurant with Drive
Thru
Indoor Water gal/year 5,120,917 0.00000
Automobile Care Center Indoor Water gal/year 385,733 0.00000 Unrefrigerated Warehouse-No Rail Indoor Water gal/year 9,250,000 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 1 / 93
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.3. Operations Emissions Compared Against Thresholds

2.4. Operations Emissions by Sector, Unmitigated

2.5. Operations Emissions by Sector, Mitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.1.2. Mitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.2. Electricity Emissions By Land Use - Mitigated
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 2 / 93

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.2.4. Natural Gas Emissions By Land Use - Mitigated

4.3. Area Emissions by Source

4.3.1. Unmitigated

4.3.2. Mitigated

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.4.2. Mitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.5.2. Mitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.6.2. Mitigated

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.7.2. Mitigated

4.8. Stationary Emissions By Equipment Type
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 3 / 93

4.8.1. Unmitigated

4.8.2. Mitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.9.2. Mitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.9.2. Mitigated

5.10. Operational Area Sources

5.10.1. Hearths
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 4 / 93

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.10.4. Landscape Equipment - Mitigated

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.11.2. Mitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.12.2. Mitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.13.2. Mitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.14.2. Mitigated

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.15.2. Mitigated
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 5 / 93

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.1.2. Mitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

5.18.2.2. Mitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 6 / 93

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data

8.1. Justifications

8.3. Land Use

8.5. Operations

8.5.1. Mobile Sources

8.5.1.1. Vehicle Data

8.5.1.2. Fleet Mix

8.5.3. Energy Usage

8.5.4. Water and Waste Water
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 7 / 93

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name LOKH-01_Operation Full Buildout_Mitigated_AQ Operational Year 2027
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.70000
Precipitation (days) 18.0000
Location 35.382244024302594, -119.09464262587437
County Kern-San Joaquin
City Bakersfield
Air District San Joaquin Valley APCD
Air Basin San Joaquin Valley
TAZ 2817
EDFZ 5
Electric Utility Pacific Gas & Electric Company
Gas Utility Southern California Gas
App Version 2022.1.1.41

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Regional Shopping
Center
335.003 1000sqft 7.39000 335,003 379,446 0.00000 — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 8 / 93
Medical Office 9.12900 1000sqft 0.20957 9,129.00 0.00000 — — — Building
Convenience
Market with Gas
Pumps

40.0000 Pump 0.01000 428.000 0.00000 — — —
Fast Food
Restaurant with
Drive Thru

16.8710 1000sqft 0.38730 16,871.0 0.00000 — — —
Automobile Care
Center

4.10000 1000sqft 0.09412 4,100.00 0.00000 — — —
Unrefrigerated
Warehouse-No Rail

40.0000 1000sqft 0.91827 40,000.0 0.00000 — — —
Parking Lot 2.00000 Space 25.1500 0.00000 0.00000 — — — Other Asphalt
Surfaces
390.408 1000sqft 8.96253 0.00000 0.00000 — — —
Other Non-Asphalt
Surfaces

3.03616 Acre 3.03616 0.00000 0.00000 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector Sector # Measure Title
Area Sources LL-1 Replace Gas Powered Landscape Equipment with Zero-Emission Landscape Equipment
Area Sources AS-2 Use Low-VOC Paints

2. Emissions Summary

2.3. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 9 / 93
Unmit. 101.052 96.6986 58.2666 480.471 1.02358 0.99422 80.4144 81.4086 0.93701 20.4404 21.3774 489.446 108,082 108,572 54.8119 6.04619 448.279 112,192 Mit. 97.7569 93.6454 58.1181 462.834 1.02253 0.96289 80.4144 81.3773 0.91333 20.4404 21.3537 489.446 108,016 108,506 54.8099 6.04569 448.279 112,126 %
Reduced
3% 3% < 0.5% 4% < 0.5% 3% — < 0.5% 3% — < 0.5% — < 0.5% < 0.5% < 0.5% — — < 0.5% Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 89.4616 84.8740 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 Mit. 89.3047 84.7171 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 %
Reduced
< 0.5% < 0.5% — — — — — — — — — — — — — — — —
Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 83.8458 79.8082 56.4089 384.967 0.87410 0.90099 72.1065 73.0075 0.85224 18.3321 19.1843 489.446 92,902.9 93,392.3 54.8172 5.66711 246.729 96,698.3 Mit. 82.1412 78.2230 56.3357 376.270 0.87358 0.88554 72.1065 72.9920 0.84056 18.3321 19.1726 489.446 92,870.2 93,359.7 54.8162 5.66686 246.729 96,665.5 %
Reduced
2% 2% < 0.5% 2% — 2% — < 0.5% 1% — < 0.5% — < 0.5% < 0.5% — — — < 0.5% Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 15.3019 14.5650 10.2946 70.2565 0.15952 0.16443 13.1594 13.3239 0.15553 3.34561 3.50114 81.0334 15,381.1 15,462.2 9.07561 0.93825 40.8488 16,009.5 Mit. 14.9908 14.2757 10.2813 68.6692 0.15943 0.16161 13.1594 13.3210 0.15340 3.34561 3.49901 81.0334 15,375.7 15,456.8 9.07545 0.93821 40.8488 16,004.1 %
Reduced
2% 2% < 0.5% 2% < 0.5% 2% — < 0.5% 1% — < 0.5% — < 0.5% < 0.5% < 0.5% < 0.5% — < 0.5%

2.4. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 10 / 93
Area 12.5824 12.3404 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 101.052 96.6986 58.2666 480.471 1.02358 0.99422 80.4144 81.4086 0.93701 20.4404 21.3774 489.446 108,082 108,572 54.8119 6.04619 448.279 112,192 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Area 9.44408 9.44408 — — — — — — — — — — — — — — — —
Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 89.4616 84.8740 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 72.6723 68.8449 54.6838 374.882 0.86367 0.75999 72.1065 72.8665 0.71501 18.3321 19.0471 — 88,112.5 88,112.5 5.00258 5.35474 129.775 89,963.1 Area 10.9918 10.8724 0.07319 8.69770 0.00052 0.01545 — 0.01545 0.01168 — 0.01168 — 35.7672 35.7672 0.00150 0.00031 — 35.8961 Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 83.8458 79.8082 56.4089 384.967 0.87410 0.90099 72.1065 73.0075 0.85224 18.3321 19.1843 489.446 92,902.9 93,392.3 54.8172 5.66711 246.729 96,698.3 Annual — — — — — — — — — — — — — — — — — —
Mobile 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4 Area 2.00600 1.98421 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301 Energy 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 767.362 767.362 0.10023 0.00926 — 772.628 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 11 / 93
Water — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Waste — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173 Refrig. — — — — — — — — — — — — — — — — 19.3631 19.3631 Total 15.3019 14.5650 10.2946 70.2565 0.15952 0.16443 13.1594 13.3239 0.15553 3.34561 3.50114 81.0334 15,381.1 15,462.2 9.07561 0.93825 40.8488 16,009.5

2.5. Operations Emissions by Sector, Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 Area 9.28719 9.28719 — — — — — — — — — — — — — — — —
Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,641.26 4,641.26 0.60642 0.05607 — 4,673.13 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 97.7569 93.6454 58.1181 462.834 1.02253 0.96289 80.4144 81.3773 0.91333 20.4404 21.3537 489.446 108,016 108,506 54.8099 6.04569 448.279 112,126 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Area 9.28719 9.28719 — — — — — — — — — — — — — — — —
Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,634.91 4,634.91 0.60539 0.05595 — 4,666.71 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 89.3047 84.7171 65.8080 430.733 0.93923 0.96402 80.4144 81.3784 0.91440 20.4404 21.3548 489.446 99,585.2 100,075 55.9262 6.44926 125.546 103,520 Average
Daily
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 12 / 93
Mobile 72.6723 68.8449 54.6838 374.882 0.86367 0.75999 72.1065 72.8665 0.71501 18.3321 19.0471 — 88,112.5 88,112.5 5.00258 5.35474 129.775 89,963.1 Area 9.28719 9.28719 — — — — — — — — — — — — — — — —
Energy 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 4,638.04 4,638.04 0.60590 0.05601 — 4,669.88 Water — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Waste — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Refrig. — — — — — — — — — — — — — — — — 116.954 116.954 Total 82.1412 78.2230 56.3357 376.270 0.87358 0.88554 72.1065 72.9920 0.84056 18.3321 19.1726 489.446 92,870.2 93,359.7 54.8162 5.66686 246.729 96,665.5 Annual — — — — — — — — — — — — — — — — — —
Mobile 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4 Area 1.69491 1.69491 — — — — — — — — — — — — — — — —
Energy 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 767.880 767.880 0.10031 0.00927 — 773.152 Water — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Waste — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173 Refrig. — — — — — — — — — — — — — — — — 19.3631 19.3631 Total 14.9908 14.2757 10.2813 68.6692 0.15943 0.16161 13.1594 13.3210 0.15340 3.34561 3.49901 81.0334 15,375.7 15,456.8 9.07545 0.93821 40.8488 16,004.1

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 13 / 93
Regiona 37.3511 35.6502 23.8886 195.220 0.42840 0.35425 34.0201 34.3744 0.33328 8.64750 8.98078 — 43,683.2 43,683.2 2.11350 2.42562 140.170 44,599.0 l
Shoppin
g
Center
Medical
Office
Building

0.61607 0.58801 0.39402 3.21995 0.00707 0.00584 0.56113 0.56697 0.00550 0.14263 0.14813 — 720.510 720.510 0.03486 0.04001 2.31197 735.616 Conveni
ence
Market
with Gas
Pumps

28.4951 27.1974 18.2246 148.933 0.32682 0.27025 25.9539 26.2241 0.25426 6.59716 6.85141 — 33,325.8 33,325.8 1.61239 1.85050 106.936 34,024.5 Fast
Food
Restaurant
with
Drive
Thru

20.3110 19.3860 12.9902 106.157 0.23296 0.19263 18.4996 18.6922 0.18123 4.70237 4.88360 — 23,754.2 23,754.2 1.14929 1.31901 76.2223 24,252.2 Automo
bile
Care
Center

1.35824 1.29639 0.86869 7.09899 0.01558 0.01288 1.23711 1.24999 0.01212 0.31446 0.32658 — 1,588.50 1,588.50 0.07686 0.08821 5.09716 1,621.80 Unrefrig
erated
Wareho
use-No
Rail

0.15651 0.14938 0.10010 0.81799 0.00180 0.00148 0.14255 0.14403 0.00140 0.03623 0.03763 — 183.037 183.037 0.00886 0.01016 0.58733 186.874 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 14 / 93
Daily, — — — — — — — — — — — — — — — — — —
Winter
(Max)
Regiona
l
Shoppin
g
Center

33.7754 31.8730 27.1419 181.639 0.39316 0.35472 34.0201 34.3749 0.33373 8.64750 8.98124 — 40,119.1 40,119.1 2.58621 2.59640 3.63483 40,961.1 Medical
Office
Building

0.55709 0.52571 0.44768 2.99596 0.00648 0.00585 0.56113 0.56698 0.00550 0.14263 0.14814 — 661.724 661.724 0.04266 0.04283 0.05995 675.612 Conveni
ence
Market
with Gas
Pumps

25.7671 24.3158 20.7065 138.572 0.29994 0.27062 25.9539 26.2245 0.25460 6.59716 6.85176 — 30,606.7 30,606.7 1.97301 1.98079 2.77300 31,249.1 Fast
Food
Restaurant
with
Drive
Thru

18.3665 17.3320 14.7593 98.7724 0.21379 0.19289 18.4996 18.6925 0.18148 4.70237 4.88385 — 21,816.1 21,816.1 1.40634 1.41188 1.97656 22,274.0 Automo
bile
Care
Center

1.22821 1.15903 0.98699 6.60514 0.01430 0.01290 1.23711 1.25001 0.01214 0.31446 0.32659 — 1,458.89 1,458.89 0.09405 0.09442 0.13218 1,489.51 Unrefrig
erated
Wareho
use-No
Rail

0.14152 0.13355 0.11373 0.76109 0.00165 0.00149 0.14255 0.14403 0.00140 0.03623 0.03763 — 168.103 168.103 0.01084 0.01088 0.01523 171.631 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 15 / 93
Total 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

5.66233 5.36412 4.26074 29.2093 0.06729 0.05922 5.61824 5.67746 0.05571 1.42836 1.48407 — 6,228.16 6,228.16 0.35360 0.37850 9.17301 6,358.97 Medical
Office
Building

0.07468 0.07074 0.05619 0.38522 0.00089 0.00078 0.07410 0.07488 0.00073 0.01884 0.01957 — 82.1394 82.1394 0.00466 0.00499 0.12098 83.8645 Conveni
ence
Market
with Gas
Pumps

4.71281 4.46461 3.54625 24.3112 0.05601 0.04929 4.67612 4.72540 0.04637 1.18884 1.23521 — 5,183.76 5,183.76 0.29431 0.31503 7.63479 5,292.63 Fast
Food
Restaurant
with
Drive
Thru

2.57177 2.43633 1.93518 13.2665 0.03056 0.02690 2.55175 2.57864 0.02530 0.64875 0.67405 — 2,828.77 2,828.77 0.16060 0.17191 4.16629 2,888.18 Automo
bile
Care
Center

0.21757 0.20611 0.16371 1.12234 0.00259 0.00228 0.21588 0.21815 0.00214 0.05488 0.05702 — 239.311 239.311 0.01359 0.01454 0.35246 244.337 Unrefrig
erated
Wareho
use-No
Rail

0.02354 0.02230 0.01771 0.12142 0.00028 0.00025 0.02335 0.02360 0.00023 0.00594 0.00617 — 25.8897 25.8897 0.00147 0.00157 0.03813 26.4335 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 16 / 93
Total 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4

4.1.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

37.3511 35.6502 23.8886 195.220 0.42840 0.35425 34.0201 34.3744 0.33328 8.64750 8.98078 — 43,683.2 43,683.2 2.11350 2.42562 140.170 44,599.0 Medical
Office
Building

0.61607 0.58801 0.39402 3.21995 0.00707 0.00584 0.56113 0.56697 0.00550 0.14263 0.14813 — 720.510 720.510 0.03486 0.04001 2.31197 735.616 Conveni
ence
Market
with Gas
Pumps

28.4951 27.1974 18.2246 148.933 0.32682 0.27025 25.9539 26.2241 0.25426 6.59716 6.85141 — 33,325.8 33,325.8 1.61239 1.85050 106.936 34,024.5 Fast
Food
Restaurant
with
Drive
Thru

20.3110 19.3860 12.9902 106.157 0.23296 0.19263 18.4996 18.6922 0.18123 4.70237 4.88360 — 23,754.2 23,754.2 1.14929 1.31901 76.2223 24,252.2 Automo
bile
Care
Center

1.35824 1.29639 0.86869 7.09899 0.01558 0.01288 1.23711 1.24999 0.01212 0.31446 0.32658 — 1,588.50 1,588.50 0.07686 0.08821 5.09716 1,621.80 Unrefrig
erated
Wareho
use-No
Rail

0.15651 0.14938 0.10010 0.81799 0.00180 0.00148 0.14255 0.14403 0.00140 0.03623 0.03763 — 183.037 183.037 0.00886 0.01016 0.58733 186.874 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 17 / 93
Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 88.2880 84.2674 56.4662 461.447 1.01261 0.83734 80.4144 81.2518 0.78778 20.4404 21.2281 — 103,255 103,255 4.99575 5.73350 331.325 105,420 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

33.7754 31.8730 27.1419 181.639 0.39316 0.35472 34.0201 34.3749 0.33373 8.64750 8.98124 — 40,119.1 40,119.1 2.58621 2.59640 3.63483 40,961.1 Medical
Office
Building

0.55709 0.52571 0.44768 2.99596 0.00648 0.00585 0.56113 0.56698 0.00550 0.14263 0.14814 — 661.724 661.724 0.04266 0.04283 0.05995 675.612 Conveni
ence
Market
with Gas
Pumps

25.7671 24.3158 20.7065 138.572 0.29994 0.27062 25.9539 26.2245 0.25460 6.59716 6.85176 — 30,606.7 30,606.7 1.97301 1.98079 2.77300 31,249.1 Fast
Food
Restaurant
with
Drive
Thru

18.3665 17.3320 14.7593 98.7724 0.21379 0.19289 18.4996 18.6925 0.18148 4.70237 4.88385 — 21,816.1 21,816.1 1.40634 1.41188 1.97656 22,274.0 Automo
bile
Care
Center

1.22821 1.15903 0.98699 6.60514 0.01430 0.01290 1.23711 1.25001 0.01214 0.31446 0.32659 — 1,458.89 1,458.89 0.09405 0.09442 0.13218 1,489.51 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 18 / 93
Unrefrig 0.14152 0.13355 0.11373 0.76109 0.00165 0.00149 0.14255 0.14403 0.00140 0.03623 0.03763 — 168.103 168.103 0.01084 0.01088 0.01523 171.631 erated
Wareho
use-No
Rail
Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 79.8358 75.3391 64.1561 429.346 0.92932 0.83847 80.4144 81.2529 0.78886 20.4404 21.2292 — 94,830.6 94,830.6 6.11310 6.13719 8.59175 96,820.9 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

5.66233 5.36412 4.26074 29.2093 0.06729 0.05922 5.61824 5.67746 0.05571 1.42836 1.48407 — 6,228.16 6,228.16 0.35360 0.37850 9.17301 6,358.97 Medical
Office
Building

0.07468 0.07074 0.05619 0.38522 0.00089 0.00078 0.07410 0.07488 0.00073 0.01884 0.01957 — 82.1394 82.1394 0.00466 0.00499 0.12098 83.8645 Conveni
ence
Market
with Gas
Pumps

4.71281 4.46461 3.54625 24.3112 0.05601 0.04929 4.67612 4.72540 0.04637 1.18884 1.23521 — 5,183.76 5,183.76 0.29431 0.31503 7.63479 5,292.63 Fast
Food
Restaurant
with
Drive
Thru

2.57177 2.43633 1.93518 13.2665 0.03056 0.02690 2.55175 2.57864 0.02530 0.64875 0.67405 — 2,828.77 2,828.77 0.16060 0.17191 4.16629 2,888.18 Automo
bile
Care
Center

0.21757 0.20611 0.16371 1.12234 0.00259 0.00228 0.21588 0.21815 0.00214 0.05488 0.05702 — 239.311 239.311 0.01359 0.01454 0.35246 244.337 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 19 / 93
Unrefrig
Warehouse-No
Rail

0.02354 0.02230 0.01771 0.12142 0.00028 0.00025 0.02335 0.02360 0.00023 0.00594 0.00617 — 25.8897 25.8897 0.00147 0.00157 0.03813 26.4335 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Total 13.2627 12.5642 9.97979 68.4160 0.15762 0.13870 13.1594 13.2981 0.13049 3.34561 3.47610 — 14,588.0 14,588.0 0.82823 0.88654 21.4857 14,894.4

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 1,305.34 1,305.34 0.21118 0.02560 — 1,318.25 Medical
Office
Building
— — — — — — — — — — — — 119.619 119.619 0.01935 0.00235 — 120.802 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 14.0307 14.0307 0.00227 0.00028 — 14.1694 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 20 / 93
Fast — — — — — — — — — — — — 421.294 421.294 0.06816 0.00826 — 425.460 Food
Restaurant
with
Drive
Thru
Automo
bile
Care
Center
— — — — — — — — — — — — 27.1845 27.1845 0.00440 0.00053 — 27.4533 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.081 240.081 0.03884 0.00471 — 242.455 Parking
Lot
— — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,663.88 2,663.88 0.43096 0.05224 — 2,690.22 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 1,305.34 1,305.34 0.21118 0.02560 — 1,318.25 Medical
Office
Building
— — — — — — — — — — — — 119.619 119.619 0.01935 0.00235 — 120.802 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 21 / 93
Conveni — — — — — — — — — — — — 14.0307 14.0307 0.00227 0.00028 — 14.1694 ence
Market
with Gas
Pumps
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 421.294 421.294 0.06816 0.00826 — 425.460 Automo
bile
Care
Center
— — — — — — — — — — — — 27.1845 27.1845 0.00440 0.00053 — 27.4533 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.081 240.081 0.03884 0.00471 — 242.455 Parking
Lot
— — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,663.88 2,663.88 0.43096 0.05224 — 2,690.22 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — 216.114 216.114 0.03496 0.00424 — 218.251 Medical
Office
Building
— — — — — — — — — — — — 19.8043 19.8043 0.00320 0.00039 — 20.0001 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 22 / 93
Conveni
Market
with Gas
Pumps
— — — — — — — — — — — — 2.32294 2.32294 0.00038 0.00005 — 2.34591 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 69.7501 69.7501 0.01128 0.00137 — 70.4397 Automo
bile
Care
Center
— — — — — — — — — — — — 4.50070 4.50070 0.00073 0.00009 — 4.54520 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 39.7482 39.7482 0.00643 0.00078 — 40.1412 Parking
Lot
— — — — — — — — — — — — 88.7953 88.7953 0.01437 0.00174 — 89.6734 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 441.035 441.035 0.07135 0.00865 — 445.396

4.2.2. Electricity Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 23 / 93
Regiona — — — — — — — — — — — — 1,310.59 1,310.59 0.21202 0.02570 — 1,323.55 l
Medical
Office
Building
— — — — — — — — — — — — 119.762 119.762 0.01937 0.00235 — 120.946 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 14.0374 14.0374 0.00227 0.00028 — 14.1762 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 421.559 421.559 0.06820 0.00827 — 425.727 Automo
bile
Care
Center
— — — — — — — — — — — — 27.2487 27.2487 0.00441 0.00053 — 27.5182 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.708 240.708 0.03894 0.00472 — 243.088 Parking
Lot
— — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,670.23 2,670.23 0.43199 0.05236 — 2,696.63 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 24 / 93
Regiona — — — — — — — — — — — — 1,305.34 1,305.34 0.21118 0.02560 — 1,318.25 l
Medical
Office
Building
— — — — — — — — — — — — 119.619 119.619 0.01935 0.00235 — 120.802 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 14.0307 14.0307 0.00227 0.00028 — 14.1694 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 421.294 421.294 0.06816 0.00826 — 425.460 Automo
bile
Care
Center
— — — — — — — — — — — — 27.1845 27.1845 0.00440 0.00053 — 27.4533 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 240.081 240.081 0.03884 0.00471 — 242.455 Parking
Lot
— — — — — — — — — — — — 536.329 536.329 0.08677 0.01052 — 541.632 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 2,663.88 2,663.88 0.43096 0.05224 — 2,690.22 Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 25 / 93
Regiona — — — — — — — — — — — — 216.542 216.542 0.03503 0.00425 — 218.683 l
Shoppin
g
Medical
Office
Building
— — — — — — — — — — — — 19.8160 19.8160 0.00321 0.00039 — 20.0119 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — 2.32349 2.32349 0.00038 0.00005 — 2.34646 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — 69.7716 69.7716 0.01129 0.00137 — 70.4615 Automo
bile
Care
Center
— — — — — — — — — — — — 4.50595 4.50595 0.00073 0.00009 — 4.55050 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — — 39.7993 39.7993 0.00644 0.00078 — 40.1929 Parking
Lot
— — — — — — — — — — — — 88.7953 88.7953 0.01437 0.00174 — 89.6734 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — — 441.554 441.554 0.07143 0.00866 — 445.920

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 26 / 93
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 Fast
Food
Restaurant
with
Drive
Thru

0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 Automo
bile
Care
Center

0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 27 / 93
Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 Fast
Food
Restaurant
with
Drive
Thru

0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 Automo
bile
Care
Center

0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 28 / 93
Other 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Asphalt
Surfaces
Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.01769 0.00884 0.16081 0.13508 0.00096 0.01222 — 0.01222 0.01222 — 0.01222 — 174.061 174.061 0.01540 0.00033 — 174.544 Medical
Office
Building

0.00197 0.00098 0.01787 0.01501 0.00011 0.00136 — 0.00136 0.00136 — 0.00136 — 19.3459 19.3459 0.00171 0.00004 — 19.3995 Conveni
ence
Market
with Gas
Pumps

0.00008 0.00004 0.00070 0.00059 <

0.000005

0.00005 — 0.00005 0.00005 — 0.00005 — 0.75758 0.75758 0.00007 <

0.000005
— 0.75968
Fast
Food
Restaurant
with
Drive
Thru

0.01137 0.00569 0.10340 0.08686 0.00062 0.00786 — 0.00786 0.00786 — 0.00786 — 111.927 111.927 0.00991 0.00021 — 112.238 Automo
bile
Care
Center

0.00091 0.00045 0.00823 0.00692 0.00005 0.00063 — 0.00063 0.00063 — 0.00063 — 8.91336 8.91336 0.00079 0.00002 — 8.93809 Unrefrig
erated
Wareho
use-No
Rail

0.00115 0.00058 0.01046 0.00879 0.00006 0.00079 — 0.00079 0.00079 — 0.00079 — 11.3212 11.3212 0.00100 0.00002 — 11.3526 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 29 / 93
Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 326.327 326.327 0.02888 0.00061 — 327.232

4.2.4. Natural Gas Emissions By Land Use - Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 Fast
Food
Restaurant
with
Drive
Thru

0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 30 / 93
Automo 0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 bile
Care
Center
Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.09692 0.04846 0.88113 0.74015 0.00529 0.06697 — 0.06697 0.06697 — 0.06697 — 1,051.34 1,051.34 0.09304 0.00198 — 1,054.26 Medical
Office
Building

0.01077 0.00539 0.09793 0.08226 0.00059 0.00744 — 0.00744 0.00744 — 0.00744 — 116.850 116.850 0.01034 0.00022 — 117.174 Conveni
ence
Market
with Gas
Pumps

0.00042 0.00021 0.00384 0.00322 0.00002 0.00029 — 0.00029 0.00029 — 0.00029 — 4.57584 4.57584 0.00040 0.00001 — 4.58853 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 31 / 93
Fast 0.06233 0.03116 0.56660 0.47594 0.00340 0.04306 — 0.04306 0.04306 — 0.04306 — 676.046 676.046 0.05983 0.00127 — 677.921 Food
Restaurant
with
Drive
Thru
Automo
bile
Care
Center

0.00496 0.00248 0.04512 0.03790 0.00027 0.00343 — 0.00343 0.00343 — 0.00343 — 53.8372 53.8372 0.00476 0.00010 — 53.9865 Unrefrig
erated
Wareho
use-No
Rail

0.00630 0.00315 0.05731 0.04814 0.00034 0.00436 — 0.00436 0.00436 — 0.00436 — 68.3807 68.3807 0.00605 0.00013 — 68.5703 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.18171 0.09086 1.65193 1.38762 0.00991 0.12555 — 0.12555 0.12555 — 0.12555 — 1,971.03 1,971.03 0.17444 0.00371 — 1,976.50 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center

0.01769 0.00884 0.16081 0.13508 0.00096 0.01222 — 0.01222 0.01222 — 0.01222 — 174.061 174.061 0.01540 0.00033 — 174.544 Medical
Office
Building

0.00197 0.00098 0.01787 0.01501 0.00011 0.00136 — 0.00136 0.00136 — 0.00136 — 19.3459 19.3459 0.00171 0.00004 — 19.3995 Conveni
ence
Market
with Gas
Pumps

0.00008 0.00004 0.00070 0.00059 <

0.000005

0.00005 — 0.00005 0.00005 — 0.00005 — 0.75758 0.75758 0.00007 <

0.000005
— 0.75968
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 32 / 93
Fast
Food
Restaurant
with
Drive
Thru

0.01137 0.00569 0.10340 0.08686 0.00062 0.00786 — 0.00786 0.00786 — 0.00786 — 111.927 111.927 0.00991 0.00021 — 112.238 Automo
bile
Care
Center

0.00091 0.00045 0.00823 0.00692 0.00005 0.00063 — 0.00063 0.00063 — 0.00063 — 8.91336 8.91336 0.00079 0.00002 — 8.93809 Unrefrig
erated
Wareho
use-No
Rail

0.00115 0.00058 0.01046 0.00879 0.00006 0.00079 — 0.00079 0.00079 — 0.00079 — 11.3212 11.3212 0.00100 0.00002 — 11.3526 Parking
Lot

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 0.00000 — 0.00000 — 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total 0.03316 0.01658 0.30148 0.25324 0.00181 0.02291 — 0.02291 0.02291 — 0.02291 — 326.327 326.327 0.02888 0.00061 — 327.232

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 33 / 93
Architect
Coatings

0.63845 0.63845 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent

3.13835 2.89631 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 Total 12.5824 12.3404 0.14841 17.6370 0.00105 0.03133 — 0.03133 0.02368 — 0.02368 — 72.5279 72.5279 0.00304 0.00062 — 72.7894 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.63845 0.63845 — — — — — — — — — — — — — — — —
Total 9.44408 9.44408 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Product
s

1.60703 1.60703 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.11652 0.11652 — — — — — — — — — — — — — — — —
Landsca
pe
Equipm
ent

0.28245 0.26067 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301 Total 2.00600 1.98421 0.01336 1.58733 0.00009 0.00282 — 0.00282 0.00213 — 0.00213 — 5.92166 5.92166 0.00025 0.00005 — 5.94301

4.3.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 34 / 93
Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.48156 0.48156 — — — — — — — — — — — — — — — —
Total 9.28719 9.28719 — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Product
s

8.80563 8.80563 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.48156 0.48156 — — — — — — — — — — — — — — — —
Total 9.28719 9.28719 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Product
s

1.60703 1.60703 — — — — — — — — — — — — — — — —
Architect
ural
Coating
s

0.08788 0.08788 — — — — — — — — — — — — — — — —
Total 1.69491 1.69491 — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 35 / 93

4.4. Water Emissions by Land Use

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 36 / 93
Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 37 / 93
Unrefrig — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 erated
Wareho
use-No
Rail
Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 38 / 93
Unrefrig
Warehouse-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803

4.4.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 39 / 93
Fast — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Food
Restaurant
with
Drive
Thru
Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 40 / 93
Conveni — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 ence
Market
with Gas
Pumps
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 104.162 119.662 223.824 10.7000 0.25611 — 567.646 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803 Medical
Office
Building
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 41 / 93
Conveni
Market
with Gas
Pumps
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Automo
bile
Care
Center
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 17.2452 19.8115 37.0567 1.77150 0.04240 — 93.9803

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 42 / 93
Daily, — — — — — — — — — — — — — — — — — —
Summer
(Max)
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 Automo
bile
Care
Center
— — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 43 / 93
Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 Automo
bile
Care
Center
— — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 44 / 93
Other — — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Non-Asphalt
Surfaces
Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 31.3860 0.00000 31.3860 3.13692 0.00000 — 109.809 Medical
Office
Building
— — — — — — — — — — — 8.79722 0.00000 8.79722 0.87925 0.00000 — 30.7785 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 1.51237 0.00000 1.51237 0.15116 0.00000 — 5.29126 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 17.3401 0.00000 17.3401 1.73308 0.00000 — 60.6671 Automo
bile
Care
Center
— — — — — — — — — — — 1.39748 0.00000 1.39748 0.13967 0.00000 — 4.88931 Unrefrig
erated
Wareho
use-No
Rail
— — — — — — — — — — — 3.35495 0.00000 3.35495 0.33532 0.00000 — 11.7378 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 45 / 93
Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173

4.5.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 Automo
bile
Care
Center
— — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 46 / 93
Unrefrig — — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 erated
Wareho
Rail
Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 189.573 0.00000 189.573 18.9472 0.00000 — 663.253 Medical
Office
Building
— — — — — — — — — — — 53.1357 0.00000 53.1357 5.31072 0.00000 — 185.904 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 9.13479 0.00000 9.13479 0.91299 0.00000 — 31.9595 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 104.735 0.00000 104.735 10.4679 0.00000 — 366.432 Automo
bile
Care
Center
— — — — — — — — — — — 8.44086 0.00000 8.44086 0.84363 0.00000 — 29.5317 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 47 / 93
Unrefrig
Warehouse-No
Rail
— — — — — — — — — — — 20.2641 0.00000 20.2641 2.02532 0.00000 — 70.8972 Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 385.284 0.00000 385.284 38.5077 0.00000 — 1,347.98 Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — 31.3860 0.00000 31.3860 3.13692 0.00000 — 109.809 Medical
Office
Building
— — — — — — — — — — — 8.79722 0.00000 8.79722 0.87925 0.00000 — 30.7785 Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — 1.51237 0.00000 1.51237 0.15116 0.00000 — 5.29126 Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — 17.3401 0.00000 17.3401 1.73308 0.00000 — 60.6671 Automo
bile
Care
Center
— — — — — — — — — — — 1.39748 0.00000 1.39748 0.13967 0.00000 — 4.88931 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 48 / 93
Unrefrig — — — — — — — — — — — 3.35495 0.00000 3.35495 0.33532 0.00000 — 11.7378 erated
Wareho
Rail
Parking
Lot
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Other
Non-Asphalt
Surfaces
— — — — — — — — — — — 0.00000 0.00000 0.00000 0.00000 0.00000 — 0.00000 Total — — — — — — — — — — — 63.7881 0.00000 63.7881 6.37540 0.00000 — 223.173

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.23326 0.23326
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 88.7327 88.7327
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 49 / 93
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 26.3737 26.3737
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00640 0.00640
Total — — — — — — — — — — — — — — — — 116.954 116.954
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.23326 0.23326
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 88.7327 88.7327
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 26.3737 26.3737
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00640 0.00640
Total — — — — — — — — — — — — — — — — 116.954 116.954
Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 50 / 93
Regiona
Shopping
Center
— — — — — — — — — — — — — — — — 0.26626 0.26626
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.03862 0.03862
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 14.6907 14.6907
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 4.36646 4.36646
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00106 0.00106
Total — — — — — — — — — — — — — — — — 19.3631 19.3631

4.6.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 51 / 93
Medical — — — — — — — — — — — — — — — — 0.23326 0.23326 Office
Building
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 88.7327 88.7327
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 26.3737 26.3737
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00640 0.00640
Total — — — — — — — — — — — — — — — — 116.954 116.954
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 1.60822 1.60822
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.23326 0.23326
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 88.7327 88.7327
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 52 / 93
Fast — — — — — — — — — — — — — — — — 26.3737 26.3737
Food
Restaurant
with
Drive
Thru
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00640 0.00640
Total — — — — — — — — — — — — — — — — 116.954 116.954
Annual — — — — — — — — — — — — — — — — — —
Regiona
l
Shoppin
g
Center
— — — — — — — — — — — — — — — — 0.26626 0.26626
Medical
Office
Building
— — — — — — — — — — — — — — — — 0.03862 0.03862
Conveni
ence
Market
with Gas
Pumps
— — — — — — — — — — — — — — — — 14.6907 14.6907
Fast
Food
Restaurant
with
Drive
Thru
— — — — — — — — — — — — — — — — 4.36646 4.36646
Automo
bile
Care
Center
— — — — — — — — — — — — — — — — 0.00106 0.00106
Total — — — — — — — — — — — — — — — — 19.3631 19.3631

4.7. Offroad Emissions By Equipment Type
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 53 / 93

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.7.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 54 / 93

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 55 / 93
Total — — — — — — — — — — — — — — — — — —

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.9.2. Mitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipm
ent
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 56 / 93
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 57 / 93
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 58 / 93
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

4.10.4. Soil Carbon Accumulation By Vegetation Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetati
on
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.5. Above and Belowground Carbon Accumulation by Land Use Type - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 59 / 93
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.6. Avoided and Sequestered Emissions by Species - Mitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 60 / 93
Remove — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Regional Shopping
Center
12,162.0 12,113.9 5,009.55 4,063,674 47,868.1 47,678.9 19,717.0 15,994,119 Medical Office
Building
200.600 22.0800 2.73600 53,593.3 789.537 86.9042 10.7686 210,936 Convenience
Market with Gas
Pumps
9,278.36 9,236.50 9,236.50 3,382,236 36,518.5 36,353.7 36,353.7 13,312,064 Fast Food
Restaurant with
Drive Thru
4,917.90 6,613.50 4,193.58 1,845,679 19,356.2 26,029.9 16,505.4 7,264,364 Automobile Care
Center
422.000 442.260 442.260 156,143 1,660.94 1,740.68 1,740.68 614,559 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 61 / 93
Unrefrigerated
Warehouse-No Rail

47.3200 50.9600 36.4000 16,892.2 186.246 200.572 143.266 66,485.6 Parking Lot 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

5.9.2. Mitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Regional Shopping
Center
12,162.0 12,113.9 5,009.55 4,063,674 47,868.1 47,678.9 19,717.0 15,994,119 Medical Office
Building
200.600 22.0800 2.73600 53,593.3 789.537 86.9042 10.7686 210,936 Convenience
Market with Gas
Pumps
9,278.36 9,236.50 9,236.50 3,382,236 36,518.5 36,353.7 36,353.7 13,312,064 Fast Food
Restaurant with
Drive Thru
4,917.90 6,613.50 4,193.58 1,845,679 19,356.2 26,029.9 16,505.4 7,264,364 Automobile Care
Center
422.000 442.260 442.260 156,143 1,660.94 1,740.68 1,740.68 614,559 Unrefrigerated
Warehouse-No Rail

47.3200 50.9600 36.4000 16,892.2 186.246 200.572 143.266 66,485.6 Parking Lot 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Other Non-Asphalt
Surfaces

0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000

5.10. Operational Area Sources

5.10.1. Hearths
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 62 / 93
Land Use Hearth Type Unmitigated (number) Mitigated (number) Regional Shopping Center Wood Fireplaces 0 0
Regional Shopping Center Gas Fireplaces 0 0
Regional Shopping Center Propane Fireplaces 0 0
Regional Shopping Center Electric Fireplaces 0 0
Regional Shopping Center No Fireplaces 0 0
Regional Shopping Center Conventional Wood Stoves 0 0
Regional Shopping Center Catalytic Wood Stoves 0 0
Regional Shopping Center Non-Catalytic Wood Stoves 0 0
Regional Shopping Center Pellet Wood Stoves 0 0
Medical Office Building Wood Fireplaces 0 0
Medical Office Building Gas Fireplaces 0 0
Medical Office Building Propane Fireplaces 0 0
Medical Office Building Electric Fireplaces 0 0
Medical Office Building No Fireplaces 0 0
Medical Office Building Conventional Wood Stoves 0 0
Medical Office Building Catalytic Wood Stoves 0 0
Medical Office Building Non-Catalytic Wood Stoves 0 0
Medical Office Building Pellet Wood Stoves 0 0
Convenience Market with Gas Pumps Wood Fireplaces 0 0
Convenience Market with Gas Pumps Gas Fireplaces 0 0
Convenience Market with Gas Pumps Propane Fireplaces 0 0 Convenience Market with Gas Pumps Electric Fireplaces 0 0 Convenience Market with Gas Pumps No Fireplaces 0 0
Convenience Market with Gas Pumps Conventional Wood Stoves 0 0 Convenience Market with Gas Pumps Catalytic Wood Stoves 0 0 Convenience Market with Gas Pumps Non-Catalytic Wood Stoves 0 0 Convenience Market with Gas Pumps Pellet Wood Stoves 0 0 LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 63 / 93
Fast Food Restaurant with Drive Thru Wood Fireplaces 0 0 Fast Food Restaurant with Drive Thru Gas Fireplaces 0 0 Fast Food Restaurant with Drive Thru Propane Fireplaces 0 0 Fast Food Restaurant with Drive Thru Electric Fireplaces 0 0 Fast Food Restaurant with Drive Thru No Fireplaces 0 0
Fast Food Restaurant with Drive Thru Conventional Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Catalytic Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Non-Catalytic Wood Stoves 0 0 Fast Food Restaurant with Drive Thru Pellet Wood Stoves 0 0 Automobile Care Center Wood Fireplaces 0 0
Automobile Care Center Gas Fireplaces 0 0
Automobile Care Center Propane Fireplaces 0 0
Automobile Care Center Electric Fireplaces 0 0
Automobile Care Center No Fireplaces 0 0
Automobile Care Center Conventional Wood Stoves 0 0
Automobile Care Center Catalytic Wood Stoves 0 0
Automobile Care Center Non-Catalytic Wood Stoves 0 0
Automobile Care Center Pellet Wood Stoves 0 0
Unrefrigerated Warehouse-No Rail Wood Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Gas Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Propane Fireplaces 0 0 Unrefrigerated Warehouse-No Rail Electric Fireplaces 0 0 Unrefrigerated Warehouse-No Rail No Fireplaces 0 0
Unrefrigerated Warehouse-No Rail Conventional Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Catalytic Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Non-Catalytic Wood Stoves 0 0 Unrefrigerated Warehouse-No Rail Pellet Wood Stoves 0 0 Parking Lot Wood Fireplaces 0 0
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 64 / 93
Parking Lot Gas Fireplaces 0 0
Parking Lot Propane Fireplaces 0 0
Parking Lot Electric Fireplaces 0 0
Parking Lot No Fireplaces 0 0
Parking Lot Conventional Wood Stoves 0 0
Parking Lot Catalytic Wood Stoves 0 0
Parking Lot Non-Catalytic Wood Stoves 0 0
Parking Lot Pellet Wood Stoves 0 0
Other Asphalt Surfaces Wood Fireplaces 0 0
Other Asphalt Surfaces Gas Fireplaces 0 0
Other Asphalt Surfaces Propane Fireplaces 0 0
Other Asphalt Surfaces Electric Fireplaces 0 0
Other Asphalt Surfaces No Fireplaces 0 0
Other Asphalt Surfaces Conventional Wood Stoves 0 0
Other Asphalt Surfaces Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Non-Catalytic Wood Stoves 0 0
Other Asphalt Surfaces Pellet Wood Stoves 0 0
Other Non-Asphalt Surfaces Wood Fireplaces 0 0
Other Non-Asphalt Surfaces Gas Fireplaces 0 0
Other Non-Asphalt Surfaces Propane Fireplaces 0 0
Other Non-Asphalt Surfaces Electric Fireplaces 0 0
Other Non-Asphalt Surfaces No Fireplaces 0 0
Other Non-Asphalt Surfaces Conventional Wood Stoves 0 0 Other Non-Asphalt Surfaces Catalytic Wood Stoves 0 0
Other Non-Asphalt Surfaces Non-Catalytic Wood Stoves 0 0 Other Non-Asphalt Surfaces Pellet Wood Stoves 0 0

5.10.2. Architectural Coatings
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 65 / 93
Residential Interior Area Coated (sq
ft)
Residential Exterior Area Coated (sq
ft)
Non-Residential Interior Area Coated
(sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)

0.00000 0.00000 608,297 202,766 97,091.8

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00000
Summer Days day/yr 180.000

5.10.4. Landscape Equipment - Mitigated
Season Unit Value
Snow Days day/yr 0.00000
Summer Days day/yr 180.000

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Regional Shopping Center 2,335,726 203.983 0.0330 0.0040 3,280,464 Medical Office Building 214,042 203.983 0.0330 0.0040 364,604 Convenience Market with Gas
Pumps
25,106.0 203.983 0.0330 0.0040 14,277.8
Fast Food Restaurant with
Drive Thru
753,849 203.983 0.0330 0.0040 2,109,444
Automobile Care Center 48,642.9 203.983 0.0330 0.0040 167,987 Unrefrigerated Warehouse-No
Rail
429,593 203.983 0.0330 0.0040 213,366
Parking Lot 959,688 203.983 0.0330 0.0040 0.00000
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 66 / 93
Other Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000 Other Non-Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000

5.11.2. Mitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Regional Shopping Center 2,335,726 203.983 0.0330 0.0040 3,280,464 Medical Office Building 214,042 203.983 0.0330 0.0040 364,604 Convenience Market with Gas
Pumps
25,106.0 203.983 0.0330 0.0040 14,277.8
Fast Food Restaurant with
Drive Thru
753,849 203.983 0.0330 0.0040 2,109,444
Automobile Care Center 48,642.9 203.983 0.0330 0.0040 167,987 Unrefrigerated Warehouse-No
Rail
429,593 203.983 0.0330 0.0040 213,366
Parking Lot 959,688 203.983 0.0330 0.0040 0.00000
Other Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000 Other Non-Asphalt Surfaces 0.00000 203.983 0.0330 0.0040 0.00000

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Regional Shopping Center 54,357,625 0.00000
Medical Office Building 0.00000 0.00000
Convenience Market with Gas Pumps 0.00000 0.00000
Fast Food Restaurant with Drive Thru 0.00000 0.00000
Automobile Care Center 0.00000 0.00000
Unrefrigerated Warehouse-No Rail 0.00000 0.00000
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 67 / 93
Parking Lot 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
Other Non-Asphalt Surfaces 0.00000 0.00000

5.12.2. Mitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Regional Shopping Center 54,357,625 0.00000
Medical Office Building 0.00000 0.00000
Convenience Market with Gas Pumps 0.00000 0.00000
Fast Food Restaurant with Drive Thru 0.00000 0.00000
Automobile Care Center 0.00000 0.00000
Unrefrigerated Warehouse-No Rail 0.00000 0.00000
Parking Lot 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
Other Non-Asphalt Surfaces 0.00000 0.00000

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Regional Shopping Center 351.753 0.00000
Medical Office Building 98.5932 0.00000
Convenience Market with Gas Pumps 16.9496 0.00000
Fast Food Restaurant with Drive Thru 194.336 0.00000
Automobile Care Center 15.6620 0.00000
Unrefrigerated Warehouse-No Rail 37.6000 0.00000
Parking Lot 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 68 / 93
Other Non-Asphalt Surfaces 0.00000 0.00000

5.13.2. Mitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Regional Shopping Center 351.753 0.00000
Medical Office Building 98.5932 0.00000
Convenience Market with Gas Pumps 16.9496 0.00000
Fast Food Restaurant with Drive Thru 194.336 0.00000
Automobile Care Center 15.6620 0.00000
Unrefrigerated Warehouse-No Rail 37.6000 0.00000
Parking Lot 0.00000 0.00000
Other Asphalt Surfaces 0.00000 0.00000
Other Non-Asphalt Surfaces 0.00000 0.00000

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Regional Shopping
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Regional Shopping
Center
Stand-alone retail
refrigerators and
freezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
Medical Office
Building
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.45455 0.60000 0.00000 1.000000
Medical Office
Building
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00230 4.00000 4.00000 18.0000
Convenience Market
with Gas Pumps
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 69 / 93
Convenience Market
with Gas Pumps
Supermarket
refrigeration and
condensing units
R-404A 3,922.00 26.5200 16.5000 16.5000 18.0000
Fast Food Restaurant
with Drive Thru
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Fast Food Restaurant
with Drive Thru
Other commercial A/C
and heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
Fast Food Restaurant
with Drive Thru
Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Automobile Care
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000

5.14.2. Mitigated
Land Use Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Regional Shopping
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Regional Shopping
Center
Stand-alone retail
refrigerators and
freezers
R-134a 1,430.00 0.03750 1.000000 0.00000 1.000000
Medical Office
Building
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.45455 0.60000 0.00000 1.000000
Medical Office
Building
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00230 4.00000 4.00000 18.0000
Convenience Market
with Gas Pumps
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000
Convenience Market
with Gas Pumps
Supermarket
refrigeration and
condensing units
R-404A 3,922.00 26.5200 16.5000 16.5000 18.0000
Fast Food Restaurant
with Drive Thru
Household
refrigerators and/or
freezers
R-134a 1,430.00 0.00000 0.60000 0.00000 1.000000
Fast Food Restaurant
with Drive Thru
Other commercial A/C
and heat pumps
R-410A 2,088.00 1.80000 4.00000 4.00000 18.0000
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 70 / 93
Fast Food Restaurant
with Drive Thru
Walk-in refrigerators
and freezers
R-404A 3,922.00 0.00040 7.50000 7.50000 20.0000
Automobile Care
Center
Other commercial A/C
and heat pumps
R-410A 2,088.00 0.00180 4.00000 4.00000 18.0000

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.15.2. Mitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1.2. Mitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type
LOKH-01_Operation Full Buildout_Mitigated_AQ Detailed Report, 4/10/2026 71 / 93

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.1.2. Mitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

5.18.2.2. Mitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

← All documents from this meeting