Cities Index.
Minutes, regular meeting, second session

Bakersfield City Council
November 4, 2026

Document
Minutes, regular meeting, second session
Meeting
November 4, 2026
Body
Bakersfield City Council
Pages
223
Original file
413.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 Project Site area. Table 4.13-12, Vibration Impact Levels for Phase 1 Construction Equipment (in/sec PPV), summarizes vibration levels at the various receptors. As shown in 4.13-12, Phase 1 construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-12 Vibration Levels for Phase 1 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Vibratory Roller 0.21 0.011 0.003 0.018 0.064
Large Bulldozer 0.089 0.005 0.001 0.008 0.027
Caisson Drilling 0.089 0.005 0.001 0.008 0.027
Loaded Trucks 0.076 0.004 0.001 0.006 0.023
Jackhammer 0.035 0.002 0.001 0.003 0.011
Small Bulldozer 0.003 0.000 0.000 0.000 0.001
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-23
area. Table 4.13-13, Vibration Impact Levels for Phase 2 Construction Equipment, summarizes vibration levels at the various receptors. As shown in Table 4.13-13, construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively.

Table 4.13-13 Vibration Levels for Phase 2 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference
levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east
at 465 feet1
Residential to west
at 1,770 feet1
Vibratory Roller 0.21 0.001 0.003 0.000
Large Bulldozer 0.089 0.000 0.001 0.000
Caisson Drilling 0.089 0.000 0.001 0.000
Loaded Trucks 0.076 0.000 0.001 0.000
Jackhammer 0.035 0.000 0.000 0.000
Small Bulldozer 0.003 0.000 0.000 0.000
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

Construction vibration levels due to Phase 1 and Phase 2 of the Project would be below the FTA thresholds for vibration levels and would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively. Therefore, Project related architectural damage vibration impacts would be less than significant.

Vibration Annoyance
The City does not have specific thresholds for vibration-induced annoyance related to construction activities. For purposes of this analysis, the threshold of 75 VdB will be used to determine impact significance for human vibration annoyance for residential uses and 85 VdB will be used for commercial uses. At a distance greater than approximately 50 feet, construction-generated vibration levels would be less than the 85 VdB, and at a distance greater than approximately 85 feet, vibration levels would be 78 VdB or less. To determine potential vibration-induced annoyance, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 project site area. Table 4.13-14, Vibration Impact Levels for Phase 1 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 4.13-14, Phase 1 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-14 Vibration Levels for Phase 1 Construction Equipment (VdB) Equipment
Levels in VdB
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Vibratory Roller 94 68 58 73 84
Large Bulldozer 87 61 51 66 77
Caisson Drilling 87 61 51 66 77
Loaded Trucks 86 60 50 65 76
Jackhammer 79 53 43 58 69
Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-24
Equipment
Levels in VdB
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Small Bulldozer 58 32 22 37 48
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site area. Table 4.13-15, Vibration Impact Levels for Phase 2 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 4.13-15, Phase 2 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-15 Vibration Levels for Phase 2 Construction Equipment (VdB) Reference
levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east
at 465 feet1
Residential to west
at 1,770 feet1
Vibratory Roller 94 44 56 38
Large Bulldozer 87 37 49 31
Caisson Drilling 87 37 49 31
Loaded Trucks 87 37 49 31
Jackhammer 86 36 48 30
Small Bulldozer 79 29 41 23
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

Construction vibration levels due to Phase 1 and Phase 2 of the Project would be below the FTA thresholds for vibration levels and would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential receptors, respectively. Therefore, Project related architectural damage vibration impacts would be less than significant.

Operational Vibration
Commercial operations would generate varying degrees of ground vibration, depending on the operational procedures and equipment. Commercial uses would not be immediately adjacent to vibration-sensitive uses and no significant vibration impacts would occur from vibration generated by proposed project uses. The Project is not the type of land use that could generate significant vibration. Proposed project operation would not include any substantial long-term vibration sources. Therefore, Project related operational vibration impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-25
NOI-4: The proximity of the project site to an airport or airstrip would not result in exposure of future customers and/or workers to excessive airport-related noise. [Threshold N-3]
Impact Analysis
The nearest airport to the Project Site is Meadows Field Airport (BFL), approximately 3.5 miles to the northeast. The Project would not expose people residing or working in the project area to excessive aircraft noise levels. Therefore, no impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact and no mitigation required.

Cumulative Impacts
The Project traffic analysis included 26 study roadway segments in the project vicinity.

Table 4.13-10, Project and Cumulative Traffic Noise Increase, shows that the Project and cumulative traffic noise increase over existing conditions at the 26 study roadway segments would be up to 0.4 dBA CNEL. As shown in the table, the Project would not exceed the 1.5 dBA minimum threshold. In addition, the estimated cumulative related traffic noise increase would be less than 1 dBA CNEL and the contribution from the Project would also be less than 1 dBA CNEL. As such impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Project-specific and cumulative impacts related to noise and vibration would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-26
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.14-1

4.14 Population and Housing
This section addresses any potential environmental impacts on population and housing that may result from the construction and operation of the proposed Riverview Marketplace Commercial Project (Project). This section analyzes the proposed Project’s effects on population, housing, and employment as compared to adopted growth forecasts within the geographical boundaries of the City of Bakersfield (City); and relevant policies and programs regarding planning for future development. While the Project does not include a residential component, development of the Project could indirectly induce population growth requiring the provision of additional housing within the City.

The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to population and housing. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the Kern County Council of Governments Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), U.S. Bureau of Labor Statistics and the U.S. Census.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding population and housing.

4.14.1 Regulatory Setting
Federal
Fair Housing Act (Title VIII of the Civil Rights Act of 1968, as amended) The federal Fair Housing Act (FHA) (42 U.S.C. Sections 3601-3631) prohibits discrimination in housing-related transactions and services. In general, it makes it unlawful to discriminate in the sale or rental of housing, in residential real estate-related transactions (including mortgage lending), and in the provision of services or facilities connected with housing, based on protected characteristics. The FHA is primarily administered by the U.S. Department of Housing and Urban Development (HUD), with additional enforcement authority in certain matters by the U.S.

Department of Justice (DOJ).

United States Census Bureau
The United States Census Bureau (U.S. Census Bureau) is a federal statistical agency in the U.S.

Department of Commerce responsible for producing official data about the people and economy of the United States. In practice, it conducts the decennial census (a count of every U.S. resident every 10 years, required by the Constitution) used for congressional apportionment and redistricting; runs major ongoing surveys like the American Community Survey (ACS) that provide annual estimates on population, housing, income, commuting, etc.; and produces economic and business statistics (e.g., the Economic Census) and publishes datasets/tools used widely in planning, policy, and research.

State
Government Code Sections 65583 and 65584(a)(1)
Section 65583 of the Government Code requires cities and counties to prepare a housing element as one of the state-mandated elements of the General Plan, with specific direction on its content.

Pursuant to Government Code Section 65584(a)(1), the California Department of Housing and Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-2
Community Development (HCD) is responsible for determining the regional housing needs assessment (segmented by income levels) for each region’s planning body known as a “council of governments” (COG). HCD prepares an initial housing needs assessment and then coordinates with each COG in order to arrive at the final RHNA. To date, there have been five previous housing element update “cycles.” California is now in its sixth “housing-element update cycle.” Senate Bill 330 (2019)
On October 9, 2019, Governor Newsom signed into law the Housing Crisis Act of 2019 (Senate Bill [SB] 330). SB 330 seeks to speed up housing production in the next half decade by eliminating some of the most common entitlement impediments to the creation of new housing, including delays in the local permitting process and cities enacting new requirements after an application is complete and undergoing local review—both of which can exacerbate the cost and uncertainty that sponsors of housing projects face. In addition to speeding up the timeline to obtain building permits, the bill prohibits local governments from reducing the number of homes that can be built through down-planning or down-zoning or the introduction of new discretionary design guidelines.

The bill is in effect as of January 1, 2020, and would have expired on January 1, 2025, but is now extended until January 1, 2030, with the passage of SB 8.

Senate Bill 8 (2021)
Senate Bill (SB) 8, signed in 2021, extends and expands certain provisions of the Housing Crisis Act of 2019 (SB 330). SB 8 continues various measures intended to streamline housing approvals and limit new local actions that could reduce housing capacity during the extension period. SB 8 also includes accountability measures that expand and standardize housing production reporting, including requirements for jurisdictions to submit annual housing progress information and for HCD to make specified housing element and annual progress report information more accessible to the public.

Regional
Kern County Council of Governments
The Project site is located within the jurisdiction of the Kern County Council of Governments (Kern COG). Pursuant to federal and state law, Kern COG serves as the COG, a Regional Transportation Planning Agency (RTPA), and the Metropolitan Planning Organization (MPO) for Kern County (County). As the County’s regional planning agency for transportation, Kern COG is responsible for coordinating transportation planning and programming among its member jurisdictions and partner agencies. Kern COG prepares regional transportation planning documents (including the Regional Transportation Plan/Sustainable Communities Strategy [RTP/SCS]), supports regional transit and mobility planning efforts, and programs certain state and federal transportation funds for projects and services in the Kern region, while also coordinating with other agencies on related planning considerations such as air quality and growth forecasts as applicable.

While Kern COG’s direct responsibilities are transportation-focused, it still plays an important supporting role in housing planning because California’s housing outcomes are tightly linked to regional transportation planning, growth forecasts, and funding. As the region’s MPO/RTPA, Kern COG maintains demographic and land use inputs used in regional modeling (your document notes Kern COG’s use of land use and travel demand models). Those forecasts are often used as a baseline in local general plans, infrastructure planning, and CEQA analyses that touch housing and population.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-3
Through the RTP/SCS, Kern COG sets a regional strategy intended to integrate transportation investments with land use patterns. While Kern COG does not write local housing elements, the RTP/SCS can influence where housing growth is encouraged (e.g., near jobs, along transit), which can shape local housing policy and project planning. By programming certain federal/state transportation funds, Kern COG can advance infrastructure (transit, complete streets, corridors, first/last-mile) that supports housing feasibility and implementation, especially in planned growth areas.

Under state housing element law, the COG for a region is the entity that works with HCD on the Regional Housing Needs Assessment (RHNA) process (methodology, coordination, and allocation process, depending on the region’s structure). The RHNA is mandated by State Housing Element Law as part of the periodic process of updating general plan housing elements.

The RHNA quantifies the need for housing within each jurisdiction during specified planning periods, or cycles. In prior cycles, factors such as household growth and household income distribution were the primary factors considered in determining a jurisdiction’s RHNA allocation.

Local jurisdictions are required to plan and zone to accommodate their respective RHNA allocation (housing units) by income categories through the process of updating the Housing Elements of their General Plans. Communities use the RHNA in land use planning, prioritizing local resource allocation, and in deciding how to address identified existing and future housing needs resulting from population, employment, and housing unit growth. The RHNA does not necessarily encourage or promote growth, but rather allows communities to anticipate growth, so that collectively the region and sub region can grow in ways that enhance quality of life, improve access to jobs, promote transportation mobility, and address social equity and fair share housing needs.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s population growth and housing. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.

Land Use Element
LAND/GEN-G-1 Accommodate new development which captures the economic demands generated by the marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.

LAND/GEN-G-2 Accommodate new development which provides a full mix of uses to support its population.

LAND/GEN-G-3 Accommodate new development which is compatible with and complements existing land uses.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-4
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

LAND/CD-P-16 Allow for the development of a variety of commercial uses, including those which serve residents (groceries, clothing, etc.), highway users, and tourists-visitors
LAND/CD-P-19 Allow for the intensification and development of existing commercial areas in an infill fashion
LAND/GEN-P-78: Accommodate new projects which are infill or expansion of existing urban development.

LAND/GEN-P-79: Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business.

4.14.2 Environmental Setting
Population
The Project Site is located within the City within the County of Kern (County). The City and County are relatively fast growing: over the ten years from 2012 to 2022, the City’s population increased at an annual rate of 1.4 percent per year and the County’s by 0.6 percent per year, significantly higher than the statewide growth rate of 0.3 percent per year. 1 The U.S. Census Bureau publishes statistics for all states, counties, and cities and towns with populations of 5,000 people or more. Based on the most recent U.S. Census Bureau (July 2024), the County’s population estimate is 922,529. This is an approximately 1.5 percent increase from the U.S. Census Bureau’s 2020 population estimate, which was 909,233.2 The City has also experienced notable population growth from 2020 to 2024. Based on the most recent U.S. Census Bureau (July 2024), the City’s population estimate is 417,468. This an approximately 3.2 percent increase from the U.S. Census Bureau’s 2020 population estimate for the City, which was 404,368.3
Both the County and the City are expected to see significant increases in population based on the Kern COG 2022 RTP/SCS growth trends. For the County, the population projections show a population increase to 1,076,000 in 2035; and 1,200,000 in 2046. For the City, population projections show a population increase to 507,400 in 2035; and 590,100 in 2046.4 Table 4.14-1, Population Projections for Kern County and the City of Bakersfield, summaries the historical and projected increases in population growth. 1 Placeworks. 2025. Urban Decay Analysis Technical Memorandum (Appendix J). Accessed March 2026. 2 United States Census Bureau. 2024. QuickFacts: Kern County, California. Available at:
https://www.census.gov/quickfacts/fact/table/kerncountycalifornia/PST045224. Accessed March 2026. 3 United States Census Bureau. 2024. QuickFacts: Bakersfield city, California. Available at:
https://www.census.gov/quickfacts/fact/table/kerncountycalifornia/PST045224. Accessed March 2026. 4 Kern Council of Governments. 2022. Regional Transportation Plan/Sustainable Communities Survey. Table 3-2 Growth Trends for Kern County and Selected Communities. Available at: https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf .

Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-5
Table 4.14-1: Population Projections for Kern County and the City of Bakersfield Location
2020
Population
2024
Population
2035
Population
2046
Population
Projected
population increase
(2020-2046)
%
Change
Kern County 909,233 922,529 968,371 1,200,000 290,767 32.0% City of
Bakersfield 404,368 417,468 507,400 590,100 185,732 45.9% Source: U.S. Census Bureau, 2024; Kern COG RTP/SCS, 2022.

Housing
In Metropolitan Bakersfield, approximately 80 percent of the new housing has been built on the west side, which breaks down to 40 percent north of the Kern River and another 40 percent in the southwest. With completion of a new water delivery system, the northeast has also seen activity.5 According to the Kern COG RTP/SCS, there will also be significant growth in households for both the County and the City. In 2020, the County had estimated 281,498 households. By 2046, that number will increase to 350,720 households. Similarly, the City had 127,864 households in 2020, which is estimated to increase to 174,100 by 2046. Table 4.14-2, Households in Kern County and the City of Bakerfield, identifies the total households in 2020 and projected households through 2046.

Table 4.14-2: Households in Kern County and the City of Bakerfield Location
2020
Households
2035
Households
2046
Households
Projected household
increase (2020-2046)
%
Change
Kern County 281,498 318,180 350,720 69,222 25.6%
City of
Bakersfield 127,864 151,700 174,100 46,236 36.2%
Source: Kern COG RTP/SCS, 2022.

As discussed above, the Kern COG is responsible for the County’s RHNA. According to the Kern COG 6
th Cycle RHNA Plan, the City accounts for approximately 65 percent of the County’s household growth. The RHNA Plan also quantifies the number of units required by income category for both the County and the City. Table 4.14-3, Kern County and City of Bakersfield 6 th Cycle RHNA, shows the RHNA for both jurisdictions through the end of the planning period, December 21, 2031. As shown in Table 4.14-3, the City’s RHNA is about 65 percent of the total RHNA for the County, consistent with estimated household growth.6, 7 Table 4.14-3: Kern County and City of Bakersfield 6
th Cycle RHNA
Location
Very-Low
Income Units
Low Income
Units
Moderate
Income Units
Above-Moderate
Income Units
Total RHNA
Allocation
Kern County 14,658 9,328 9,299 24,365 57,650
City of
Bakersfield 11,129 7,082 5,317 13,933 37,461
Source: Kern COG RHNA, 2023.
5 Kern Council of Governments. 2022. Regional Transportation Plan/Sustainable Communities Survey. Table 3-2 Growth Trends for Kern County and Selected Communities. Available at: https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf.

Accessed March 2026.
6 Kern Council of Governments. 2023. 6th Cycle Regional Housing Needs Allocation Plan, June 2023-December 2031. Available at:
https://www.kerncog.org/wp-content/uploads/2013/06/FINAL-Kern-COG-RHNA-Plan_07-22-22.pdf. Accessed March 2026. 7 Kern Council of Governments. 2023. Memorandum, Re: Rounding Error Adjustments to the 6th Cycle RHNA Allocation Plan Requested by HCD - 12/22/22. Available at: https://www.kerncog.org/wp-content/uploads/2023/02/RHNA-Adjust-Memo-Webpage.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-6
Employment
According to the Kern COG RTP/SCS, employment will keep pace with population for both the County and the City. In 2020, the County had estimated 334,800 employment opportunities, which will increase to 395,110 by 2046. The City had 143,449 employment opportunities in 2020, which is estimated to increase to 181,200 by 2046. Table 4.14-4, Employment in Kern County and the City of Bakerfield identifies the total employment in 2020 and projected employment through 2046.

Table 4.14-4: Employment in Kern County and the City of Bakerfield Location
2020
Employment
2035
Employment
2046
Employment
Projected employment
increase (2020-2046)
%
Change
Kern County 334,800 374,780 395,110 60,310 18.0%
City of
Bakersfield 143,449 166,100 181,200 37,751 26.3%
Source: Kern COG RTP/SCS, 2022.

According to the U.S Census Bureau, approximately 58.5% of the population within the City is in the workforce as of 2024. The U.S. Bureau of Labor Statistics provides data for the Bakersfield-Delano, CA area on both the total labor force and the unemployment rate. As of December 2025, Bakersfield-Delano had a labor force of about 416,300 persons, of which approximately 381,600 persons were employed and approximately 34,600 persons were unemployed. As such, approximately 8.3 percent of the workforce is unemployed.8

4.14.3 Impact Analysis
Methodology
Effects to population and housing associated with the Project were evaluated employing data provided by the U.S. Census Bureau, Kern COG, and the California Department of Finance, as well as local land use policies.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance9to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure).
• Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.
8 United States Department of Labor Statistics. 2025. Western Information Office. Bakersfield-Delano, CA Economy at a Glance.

Available at: https://www.bls.gov/regions/west/ca_bakersfield_msa.htm#eag_ca_bakersfield_msa.f.3. Accessed March 2026. 9 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-7
Project Impacts
Threshold POP-1: Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Impact Analysis
Growth can be induced directly (e.g., by building new homes or businesses, or by creating new jobs), or indirectly (e.g., by removing obstacles to growth, such as through the extension of infrastructure). The Project proposes the development of a commercial retail center and does not include a residential component that would result in an increase of residents and population within the City. As such, the Project would not directly induce population growth.

Indirectly, the Project does not propose the extension of roads or existing infrastructure that would result in indirect growth within the City. However, the Project could result in a significant impact if the Project creates employment opportunities that would require workers to move to the City resulting in unplanned population growth. The Project is expected to require 969 employees.

Although operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. As discussed above, the region has an unemployment rate of approximately 8.3 percent (34,600 persons) according to the U.S. Bureau of Labor Statistics. Thus, employees would likely be drawn from the existing population. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold POP-2: Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
Impact Analysis
The Project Site is located the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services. The Project Site is surrounded by existing commercial uses to the north, west, and east.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-8
The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s` M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation. As such, the Project Site is not zoned for residential development. As such, the Project would not displace existing people. As discussed, under Impact POP-1, all construction workers and employees are expected to be local and as such no additional housing would be required. As such, impacts would be less than significant and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Cumulative Impacts
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Population and Housing. For purposes of this analysis, the geographic scope would be the City.

As discussed above, the Project would not induce substantial population growth within the City.

The Project would not include components such as the extension of roads or existing infrastructure that would result in indirect growth within the City. Furthermore, the Project Site does not provide housing, nor would development of the Project site result in displacement of people or housing.

Table 4.12-1, Population Projections for Kern County and the City of Bakersfield, identifies projected increases in population growth. Similarly, Kern COG estimates that employment opportunities will grow to 11.9 percent and 15.8 percent in the County and City, respectively, by 2035, less than 8 years after the Project is expected to be operational in early 2028. Moreover, the region has an unemployment rate of approximately 8.3 percent (34,600 persons) according to the U.S. Bureau of Labor Statistics. Therefore, as further discussed under Impact POP-1, the Project’s demand for employment would be met from the City’s existing unemployed persons and the projected increases in population growth. The employment opportunities generated by the Project would also be consistent with the expected growth in the region. The employment opportunities created by the Project accounts for 4.3 percent of the total growth expected by 2035.

Furthermore, the proposed Project will serve an existing demand for employment that will result from the City’s projected future population, providing employment opportunities for the City and the surrounding community. Therefore, implementation of the proposed Project would not result in a cumulatively significant population or housing impact, and cumulative impacts from related projects are considered less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-9
Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
Not applicable. Project-specific and cumulative impacts related to population and housing would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-10
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.15-1

4.15 Public Services and Recreation
This section discusses any potential environmental impacts associated with public services and recreation that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts for any of the public services (i.e., fire protection, police protection, schools, and other public facilities (e.g., library facilities)).

Additionally, this section also evaluates potential effects based on the Project’s potential to increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated or include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.

The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to public services and recreation. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan) and the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance).

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding public services and recreation.

4.15.1 Regulatory Setting
Federal
No specific federal regulations apply to public services and recreation associated with the Project.

State
California Building Standards Code
The State of California updates its building standards, also known as the California Code of Regulations (CCR), Title 24, every three years. These codes establish uniform standards for construction and maintenance. The current code in effect is the 2025 California Building Standards Code.

California Fire Code
The California Fire Code (CFC) (24 CCR Part 9), which is part of the California Building Standards Code, is the 2025 edition and took effect on January 1, 2026. It is based on the 2024 International Fire Code (IFC) with California-specific amendments, covering fire safety, building standards, and Wildland-Urban Interface (WUI) regulations. The CFC contains regulations consistent with nationally recognized and accepted practices for safeguarding life and property from the hazards of:
• Fire and explosion;
• Dangerous conditions arising from the storage, handling, and use of hazardous materials and devices; and
Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-2
• Hazardous conditions in the use or occupancy of buildings or premises.

Specifically, the CFC sets forth regulations regarding building standards, fire protection and notification systems, fire protection devices such as fire extinguishers and smoke alarms, high-rise building standards, and fire suppression training. It contains regulations relating to construction, maintenance, and use of buildings. Topics addressed in the code also include fire department access, fire hydrants, automatic sprinkler systems, fire alarm systems, fire and explosion hazards safety, hazardous materials storage and use, provisions intended to protect and assist fire responders, industrial processes, and many other general and specialized fire-safety requirements for new and existing buildings and the surrounding premises. The CFC also contains provisions to assist emergency response personnel. These fire-safety-related building standards are referenced in other parts of Title 24. Development under the Project would be subject to applicable and most current adopted regulations of the CFC.

California Occupational Safety and Health Administration In accordance with CCR, Title 8, Section 1270 “Fire Prevention,” and Section 6773, “Fire Protection and Fire Equipment,” the California Occupational Safety and Health Administration (Cal/OSHA) has established minimum standards for fire suppression and emergency medical services. The standards include, but are not limited to, guidelines on the handling of highly combustible materials, fire hose sizing requirements, restrictions on the use of compressed air, access roads, and the testing, maintenance, and use of all firefighting and emergency medical equipment.

Mitigation Fee Act (California Government Code §§ 66000 through 66008) The Mitigation Fee Act (MFA) allows local agencies to establish fees that will be imposed on new development projects to mitigate the impact on the jurisdiction’s ability to provide specified public facilities to serve proposed development projects. The MFA requires a local agency, such as the City before establishing, increasing, or imposing an impact fee as a condition of development, to identify the purpose of the fee and the use to which the fee is to be put. The agency must also demonstrate a reasonable relationship between the fee and the purpose for which it is charged, and between the fee and the type of development project on which it is to be levied. The MFA became enforceable on January 1, 1989.

In order to comply with the MFA, a jurisdiction must follow four requirements:
1) Make certain determinations regarding the purpose and use of a fee and establish a nexus or connection between a development project or class of project and the public improvement being financed with the fee;
2) Segregate fee revenue from the general fund in order to avoid commingling of capital facilities fees and general funds;
3) For fees that have been in the possession of the jurisdiction for five years or more and for which the dollars have not been spent or committed to a project, the jurisdiction must make findings each fiscal year describing the continuing need for the money; and 4) Refund any fees with interest for which the findings noted above cannot be made.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-3
Senate Bill (SB) 50, California Government Code § 65995(b), and Education Code § 17620 SB 50 (the Leroy F. Greene School Facilities Act of 1998), adopted in 1998, defined the school impact fee needs analysis process in California Government Code (CGC) Sections 65995.5– 65998. Pursuant to its provisions, school districts may collect fees to offset the costs associated with increasing school capacity as a result of development. By statute, payment of a statutory fee by developers serves as the total mitigation of the potential impact of a development on school facilities pursuant to CEQA. SB 50 places limitations on the power of local governments to require mitigation of school facilities by developers. Under the provisions of SB 50, fees are determined based on the square footage of proposed uses. As a part of SB 50, school districts must base their long-term facilities needs and costs on long-term population growth in order to qualify for this source of funding. Prior to SB 50, case law allowed cities to consider and impose conditions to mitigate impacts of new development on school facilities.

SB 50 amended CGC Section 65995, which contains limitations on Education Code Section 17620, the statute that authorizes school districts to assess development fees within school district boundaries. CGC § 65995(b)(3) requires the maximum square footage assessment for development to be increased every two years, according to inflation adjustments.

According to CGC Section 65995(3)(h), the payment of statutory fees is “deemed to be full and complete mitigation of the impacts of any legislative or adjudicative act, or both, involving, but not limited to, the planning, use, or development of real property, or any change in governmental organization or reorganization...on the provision of adequate school facilities.” The school district is responsible for implementing the specific methods for mitigating school impacts under the CGC.

Assembly Bill (AB) 97
Approved in July 2013, AB 97 revises existing regulations related to financing for public schools, by requiring State funding for county superintendents and charter schools that previously received a general-purpose entitlement. AB 97 authorizes local educational agencies to spend, for any local educational purpose, the funds previously required to be spent for specified categorical education programs, including, among others, programs for teacher training and class size reduction.

The Quimby Act
The Quimby Act (CGC Section 66477) was established by the California legislature in 1965 to develop new or rehabilitate existing neighborhood or community park or recreation facilities. This legislation was enacted in response to the need to provide parks and recreation facilities for California’s growing communities. The Quimby Act gives the legislative body of a city or county the authority, by ordinance, to require the dedication of land or payment of in-lieu fees, or a combination of both, for park and recreational purposes as a condition of approval of a tract map or parcel map.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-4
Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s public services and recreational facilities. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.

Land Use Element
LU/PF-P-50 Coordinate with the appropriate agencies so that adequate land and facilities are set aside for schools, parks, police/fire, libraries, cultural facilities, recreational facilities, and other service uses to serve the community (I-2).

LU/PF-P-54 The developer shall be responsible for all on-site costs incurred as a result of the proposed project, in addition to a proportional share of off-site costs incurred in service extension or improvements. The availability of public or private services or resources shall be evaluated during discretionary project consideration. Availability may affect project approval or result in a reduction in size, density, or intensity otherwise indicated in the general plan's map provisions (I-6, I-11).

LU/G-P-79 Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business (I-11).

Safety Element
SAF/PS-G-1 Ensure that Bakersfield metropolitan area maintains a high level of public safety for its citizenry.

SAF/PS-G-2 Ensure that adequate police and fire services and facilities are available to meet the needs of current and future metropolitan residents through the coordination of planning and development of metropolitan police and fire facilities and services.

SAF/PS-G-3 Provide for the coordinated planning and development of service areas for police and fire protection to ensure an equitable burden of responsibility between County and City in Metropolitan Bakersfield.

SAF/PS-G-4 Assure that fire, hazardous substance regulation and emergency medical service problems are continuously identified and addressed in a proactive way, in order to optimize safety and efficiency.

SAF/PS-P-2 Require discretionary projects to assess impacts on police and fire services and facilities.

SAF/PS-P-9 Restrict, after appropriate public hearings, the use of fire-prone building materials in areas defined by the fire services as presenting high-conflagration risk.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-5
Parks Element
PARKS-G-1 Provide parks and recreation facilities to meet the planning area's diverse needs.

PARKS-G-2 Supply neighborhood parks at a minimum of 2.5 acres per 1,000 persons throughout the plan area.

PARKS-G-3 Provide four acres of park and recreation space for each 1,000 persons (based on the most recent census) for general regional recreation opportunity as a minimum standard. Park and recreational space includes mini-parks, neighborhood parks, community parks and regional parks.

PARKS-G-7 Require that the costs of park and recreation facilities and programs are borne by those who benefit from and contribute to additional demand.

PARKS-P-1 Require that neighborhood parks be developed at a minimum rate of 2.5 acres per 1,000 population. This requirement may be met all or in part by on-site recreation for such developments as Planned Unit Developments.

The City of Bakersfield may allow credit to meet the neighborhood parks requirement.

PARKS-P-3 Require developers to dedicate land, provide improvements and/or in-lieu fees to serve the needs of the population in newly developing areas.

City of Bakersfield and Kern County Joint Powers Agreement Since 1980, the City and the County have had a Joint Powers Agreement (JPA) for fire protection services, allowing both the Bakersfield Fire Department (BFD) and the Kern County Fire Department (KCFD) to be able to assist each other in responding to calls for help. The JPA between the County and the City requires the closest fire station within the Metropolitan Bakersfield area to respond to the call, whether it occurs in the City or the County and regardless of which jurisdiction maintains and staffs the station. Each agency provides comparable services.1 North of the River Recreation and Park Master Plan
The North of the River Recreation and Park District (NOR) adopted the current Recreation and Park Master Plan 2010-2020 (NOR Master Plan) on June 20, 2011, per Board Resolution 25-11.

The NOR park system includes a series of parks classified as community parks, neighborhood parks and mini parks. The NOR Master Plan is intended to be a policy document and to give long range direction to assist in the provision of facilities and services to this rapidly growing area.

4.15.2 Environmental Setting
Fire Protection
The BFD provides emergency medical services, fire suppression, hazardous materials mitigation, vehicle and technical rescue, water rescue, and other life safety services to the City.2 As previously discussed, BFD has a JPA with KCFD in which the agency with the closest fire station 1 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 2 City of Bakersfield. 2026. Departments, Fire. About the Fire Department webpage. Available at:
https://www.bakersfieldcity.us/252/About-the-Fire-Department. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-6
will respond to the call for service regardless of the jurisdiction.3 The BFD maintains 14 fire stations within the City which are located throughout the 151 square mile service area, serving over 385,000 residents.4 With 240 sworn, support, and reserve personnel, BFD’s response time goal for dispatch, turnout, and travel is approximately six minutes and 59 seconds or less 90 percent of the time. Between 2018 and 2020, BFD met the following service level performance standards:
• Low Risk Fire Service Calls: For 90 percent of all fires, the total response time for the arrival of the first due suppression apparatus, staffed with a minimum of 1 captain, 1 engineer, and 1 firefighter is 11 minutes and 55 seconds in all areas, compared to the goal of seven minutes and 19 seconds.
• Moderate Risk Fire Service Calls: For 90 percent of all moderate risk fires, the total response time for the arrival of the ERF staffed with at least 10 firefighters and officers, is 13 minutes and 16 seconds in all areas, compared to the goal of seven minutes and 19 seconds.
• High Risk Fire Service Calls: For 90 percent of all high-risk fires, the total response time for the arrival of the ERF staffed with 18 firefighters and officers is 25 minutes and 46 seconds in all areas, compared to the goal of seven minutes and 19 seconds. 5 KCFD’s total organization consists of over 621 permanent employees, serving a service area of over 8,000 square miles comprised of nine cities, 41 communities, and a population of over 922,000 residents. Specifically, over 521 uniformed firefighters are stationed at KCFD’s 47 stations. KCFD also has a goal response time of approximately 7 minutes. Between 2018 and 2020, BFD and KCFD had the following combined service level performance standards:
• Low Risk Fire Service Calls: an average of 12 minutes and 15 seconds compared to the target of seven minutes and 19 seconds.
• Moderate Risk Fire Service Calls: an average of 12 minutes and 27 seconds compared to the target of seven minutes and 19 seconds.
• High Risk Fire Service Calls: an average of 12 minutes and 42 seconds compared to the target of seven minutes and 19 seconds.

The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. KCFD Station 66, Landco Station, is also in close proximity to the Project Site, located at 3000 Landco Drive, approximately

1.93 miles east of the Project Site.6 As such, calls for service from the Project site would be addresses by KCFD.
3 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 4 Bakersfield Fire Department. 2021. Bakersfield Strategic Plan 2021-2026. Available at:
https://content.civicplus.com/api/assets/ca-bakersfield/d34299e7-7bf8-479a-8321-2ad5c2fb35e5?cache=1800. Accessed February 2026.
5 Bakersfield Fire Department. 2021. Community Risk Assessment – Standards of Cover. Available at:
https://content.civicplus.com/api/assets/ca-bakersfield/3fe1d3d6-267b-457d-974a-792cc1eeda35?cache=1800. Accessed February 2026.
6 City of Bakersfield. 2026. Departments, Fire. Locate Fire Stations GIS portal. Available at:
https://cob.maps.arcgis.com/apps/webappviewer/index.html?id=8c056dff7b2f45b6916f15f7caa7f15c Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-7
Police Protection
The Bakersfield Police Department (BPD) provides public safety and law enforcement services for the City and the Project Site. BPD’s service area extends over 150 miles, serving approximately 400,000 people. BPD has two locations for public services: the BPD headquarters at 1601 Truxtun Avenue, downtown Bakersfield, and BPD West Substation at 1301 Buena Vista Road, operated by over 600 employees.7 The Project Site is located approximately 2.8 miles northeast of the West Substation. BPD provides service to six zones within their service area:

North, Central, South, Hill, Metro, and Valley.

During 2022, BPD handled approximately 745,000 calls for service, with 271,000 being 911 calls of which approximately 258,000 resulted in dispatch. For all service calls, a service priority number one through nine is assigned to the call, one being emergency calls. According to BPD, the median response time in 2022 for Priority 1 (emergency calls) dropped from a little over seven minutes, to around six minutes and 52 seconds. The response time for Priority 2 (urgent calls) has an average of 36 minutes in 2022.
8 BFD also has a partnership with the California Highway Patrol (CHP) and the Kern County’s Sheriff’s Office (KCSO) to address specific issues within the City. Through this partnership, CHP expanded its presence in the City and addresses cases of auto theft, retail crime and traffic enforcement. KCSO assists in addressing roadway violence and criminal activity.9 Schools
The Project Site is located in the Fruitvale School District (FSD), which is located in northwest portion of the City. FSD includes Columbia Elementary, Discovery Elementary, Endeavour Elementary, Quailwood Elementary and Fruitvale Junior High Schools, and has a current TK-grade 8 enrollment of 3,062 students. Specifically, the Project Site is located within the Columbia Elementary School boundary, located at 703 Mondavi Way and approximately 0.89 miles southwest of the Project, and the Fruitvale Junior High School boundary, located at 2114 Calloway Drive and approximately 0.45 miles west of the Project Site.10 The Project Site is also within the school boundaries for Liberty High School, located at 925 Jewetta Avenue and approximately 1.68 miles southwest of the Project Site.11 Liberty High School is part of the Kern High School District (KHSD), which is California’s largest grades 9-12 high school district serving over 42,000 students.12
Parks
North of the River Recreation and Park District (NOR) plans, organizes and conducts a wide variety of park and recreation programs within the designated NOR boundaries, which includes the Project Site. NOR is 215 square miles in size, has a population of 125,000 residents, and encompasses five school districts. NOR maintains 24 park sites totaling 269.8 developed acres 7 Bakersfield Police Department. 2026. Inside BPD webpage. Available at: https://joinbpd.us/inside-bpd, Accessed February 2026. 8 Bakersfield Now. 2023. Bakersfield Police Department break down response times. Available at:
https://bakersfieldnow.com/news/local/bakersfield-police-department-breaks-down-response-times. Accessed February 2026. 9 KGET.com. 2024. CHP-Bakersfield PD crime suppression partnership expands to include Kern County Sheriff’s Office. Available at: https://www.kget.com/news/local-news/chp-bakersfield-pd-crime-prevention-partnership-expands-to-include-kern-county-sheriffs-office/. Accessed February 2026. 10 Fruitvale Schools District. 2026. District & School Boundaries Map. Available at:
https://1.cdn.edl.io/zvrE010AY3pDw5rMUmBUuq4ANUtkm0KjJ5o56ghSNFTWFiVT.pdf. Accessed February 2026. 11 Kern High School District. 2025. Kern High School District Attendance Boundaries. Available at:
https://4.files.edl.io/9823/08/13/25/162531-7107f99b-35ca-4dc6-8fae-6b121ea94130.pdf. Accessed February 2026. 12 Kern High School District. 2026. About Us webpage. Available at: https://www.kernhigh.org/apps/pages/aboutus. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-8
within its service boundaries.13 The NOR Master Plan indicates that NOR’s standard is to provide two acres per 1,000 population developed as neighborhood parks, and one acre per 1,000 developed as community parks for a total of three acres. 14 Libraries
The Kern County Library provides a full range of services and resources to over 850,000 people in every city within Kern County and unincorporated area of Kern County through a network of 22 physical locations operated by Kern County Library Headquarters. Within the Bakersfield area, Kern County Library operates seven branches. The closest branch to the Project Site is the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southeast of the Project Site.15

4.15.3 Impact Analysis
Methodology
The analysis qualitatively assessed the potential of the Project to negatively affect public services.

Data on existing fire and police operations and performance was collected from data made publicly available by the BFD, KCFD, BPD, and the City. Information on schools, parks, and other public services was collected from publicly available data provided by FSD, KHSD, NOR, Kern County Library and the City.

Thresholds of Significance
Public Services
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance16 to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
▪ Fire protection.
▪ Police protection.
▪ Schools.
▪ Parks.
▪ Other public facilities.
13 North of the River Recreation and Parks District. 2026. Service Area Map. Available at: https://www.norfun.org/service-area-map.

Accessed February 2026.
14 North of the River Recreation and Parks District. 2011. Recreation and Park Master Plan. Available at:
https://norfun.specialdistrict.org/files/162ebc44d/NOR+Master+Plan+2010-2020.pdf. Accessed February 2026. 15 Kern County Library. 2026. Hours & Locations, Branches & Bookmobile webpage. Available at: https://kerncountylibrary.org/find-hours-locations/. Accessed February 2026. 16 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-9
Recreation
Per CEQA Guidelines, an impact is considered significant if the Project would:
• Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated.
• Include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.

Project Impacts
Threshold PUB-1: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for fire protection?
Impact Analysis
As previously discussed, BFD and KCFD have a JPA in which both agencies take service calls depending on proximity to the service call. The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. As such, the Project would most likely be served by KCFD.

Project development and operation would result in an incremental increase in demand for fire protection services. However, as a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire protection services. Additionally, the Project would be constructed pursuant to CFC requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by KCFD. Further, the Project would be subject to applicable development impact fees relating to fire protection. This would allow the fire department to offset any increased demand that may result from the Project.

Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-10
Threshold PUB-2: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for police protection?
Impact Analysis
Police facilities and services are provided by the BPD. The Project Site is located approximately

2.8 miles northeast of the BPD West Substation. As described above, CHP and the KCSO also assist BPD to address specific crime and public safety issues.

As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand.

However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand.

Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-3: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for schools?
Impact Analysis
Generally, projects that induce population growth, such as the construction of new housing, result in an increased demand on schools. The proposed Project would develop a commercial development and would not require development of new housing. It is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. Therefore, the proposed Project is not anticipated to result in substantial, unplanned population growth.

The State of California requires payment of development impact fees to mitigate project impacts to school facilities (CGC Section 65996; SB 50). All new residential, commercial, and industrial construction and/or an addition of covered or enclosed space are subject to the collection of Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-11
developer fees. This fee is determined by the square footage of assessable space, which is measured from the perimeter of the structure. These fees pay for facility expansion and upgrades needed to serve new students. It is not anticipated that the proposed Project would generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-4: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for parks?
Impact Analysis
As previously discussed, the Project Site is within the NOR district. The Project is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Accordingly, the Project is not anticipated to affect service ratios, response times, or other performance objectives for parks and would not require the construction of any new or altered park facility. Therefore, impacts to parks would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-5: Would the project Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for other services?
Impact Analysis
Other public facilities typically pertain to services such as public libraries. Kern County Library operates the libraries in close proximity to the Project Site, including the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southwest of the Project Site. As Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-12
discussed, it is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold REC-1: Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Impact Analysis
Increase in the demand for existing neighborhood and regional parks or other recreational facilities typically occurs due to an increase in the residential population. The Project does not include residential components, and it is anticipated that future employees would reside within the City and immediately surrounding area. Accordingly, the proposed Project would not result in an increase in population. Therefore, implementation of the proposed Project would not result in the increased use or substantial physical deterioration of an existing neighborhood or regional park or other recreational facility, and any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold REC-2: Would the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?
Impact Analysis
The proposed Project would involve the development of a commercial marketplace that includes a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area. As discussed under Threshold REC-1, the Project would not increase demand on existing recreational facilities to a degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.

Mitigation Measures
None required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-13
Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Public Services and Recreation. It is anticipated that all cumulative projects would be served by BFD and KCFD as well as BPD in coordination with CHP and KCSO. Operation of the identified cumulative projects is anticipated to increase the overall demand for fire protection and police services; however, the Project and related projects would have less than significant impacts to fire and police services, as additional demands for fire and police protection services are unlikely to have a substantial effect on the existing firefighters and police officers to residents ratio and would result in a nominal increase in the demand for fire and police protections services. Moreover, all new development would be required to pay applicable impact fees to support fire and police protection services. Accordingly, the Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on fire and police protection services.

The Project would develop a new commercial marketplace and would not require development of new housing or would generate any new students or increase demand for school services. As discussed, it is anticipated that future employees of the proposed Project would reside within the City and in the immediately surrounding area. Therefore, the Project is not anticipated to result in substantial, unplanned population growth or demand for new schools. The Project as well as all the cumulative projects identified would be subject to impact fees in compliance with State law.

Accordingly, the Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on schools.

It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Accordingly, the Project is not anticipated to affect service ratios or other performance objectives for parks and would not require the construction of any new or altered park facility. Cumulative non-residential projects near the Project would not affect service ratios for parks and would not require the construction of any new or altered parks for the same reason. For cumulative projects that include housing, those individual projects would be required to analyze their impact to parks and recreation services and mitigate their impact if necessary. Therefore, the less than significant impacts associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect parks near the Project Site. Cumulative impacts associated with parks and recreation would be less than significant.

The Project would not result in substantial unplanned population growth, affecting service ratios or other performance objectives for other services such as libraries. As with recreation and parks, non-residential projects would likely have a nominal impact to recreation services. Cumulative housing projects would be required to assess whether the project would increase the use of libraries and mitigate its impact if necessary. As such, the less than significant impacts associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect libraries near the Project Site. Cumulative impacts associated with libraries would be less than significant.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-14
Level of Significance After Mitigation
Project-specific and cumulative impacts related to public services would be less than significant with no mitigation required.

City of Bakersfield – SCH No. 2025101507 4.16-1

4.16 Transportation
This section discusses the impacts associated with the potential for the proposed Riverview Marketplace Commercial Project (Project) on transportation and traffic. Potential effects are evaluated relative to conflicts with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities; conflicts or inconsistencies with CEQA Guidelines Section 15064.3, subdivision (b); substantially increasing hazards due to a geometric design feature or incompatible uses; or resulting in inadequate emergency access.

This section includes a description of existing transportation and circulation conditions in the Project vicinity, a summary of applicable regulations related to transportation, and an evaluation of the potential transportation and traffic impacts that would be generated during construction and operation of the Project. Information in this section is based, in part, on the Riverview Market Transportation Analysis (TIA) prepared for the Project by Integrated Engineering Group (IEG) (Appendix H-1) and a Vehicle Miles Traveled (VMT) Analysis prepared for the Project by General Technologies and Solutions (GTS) (Appendix H-2), included in Appendix H Transportation Analysis, of this Draft Environmental Impact Report (Draft EIR), as well as the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield Municipal Code (Municipal Code) and the City of Bakersfield (City) Title 17 - Zoning Ordinance (Zoning Ordinance).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP) related to transportation.

4.16.1 Regulatory Setting
State
Senate Bill No. 743
California Senate Bill (SB) 743, which was signed into law in 2013, initiated an update to the CEQA Guidelines to change how lead agencies evaluate transportation impacts under CEQA, with the goal of better measuring the actual transportation-related environmental impacts of any given project. Traditionally, transportation impacts have been evaluated by examining whether the project is likely to cause automobile delay at intersections and congestion on nearby individual highway segments, and whether this delay will exceed a certain amount (this is known as Level of Service or LOS analysis). As of July 1, 2020, agencies analyzing the transportation impacts of new projects must use the VMT metric instead of LOS in evaluating traffic impacts in CEQA documents. VMT measures how much actual auto travel (additional miles driven) a project would add to California roads.

Regional
Kern County Council of Governments Regional Transportation Plan/Sustainable Communities Strategy
The Project site is located within the jurisdiction of the Kern County Council of Governments (Kern COG). Pursuant to federal and state law, Kern COG serves as the Regional Transportation Planning Agency (TPA), and the Metropolitan Planning Organization (MPO) for Kern County (County). As the County’s regional planning agency for transportation, Kern COG is responsible for coordinating transportation planning and programming among its member jurisdictions and partner agencies. Kern COG prepares regional transportation planning documents (including the Regional Transportation Plan/Sustainable Communities Strategy [RTP/SCS]), supports regional Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-2
transit and mobility planning efforts, and programs certain state and federal transportation funds for projects and services in the Kern region, while also coordinating with other agencies on related planning considerations such as air quality and growth forecasts as applicable.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies, in order to protect the City’s transportation capabilities.

Land Use Element
LAND/COM-P-29 Require that automobile and truck access to commercial properties sited adjacent to designated residential parcels be located at the maximum practical distance from the residential parcel.

LAND/COM-P-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

LAND/PF-P-54 The developer shall be responsible for all on-site costs incurred as a result of the proposed project, in addition to a proportional share of off-site costs incurred in service extension or improvements. The availability of public or private services or resources shall be evaluated during discretionary project consideration. Availability may affect project approval or result in a reduction in size, density, or intensity otherwise indicated in the general plan's map provisions.

LAND/COM-G-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-3
Circulation Element
CIRC/G-1 Provide a safe and efficient street system that links all parts of the area for movement of people and goods.

CIRC/G-2 Provide for safe and efficient motorized, non-motorized, and pedestrian traffic movement.

CIRC/G-3 Minimize the impact of truck traffic on circulation, and on noise sensitive land uses.

CIRC/STR-P-6 Design and locate site access driveways to minimize traffic disruption where possible considering items such as topography, past parcelization and other factors.

CIRC/STR-P-7 Minimize direct and uncontrolled property access from arterials.

CIRC/STR-P-16 Require that truck access to commercial and industrial properties be designed to minimize impacts on adjacent residential parcels.

CIRC/STR-P-17 Require buildings expected to be serviced by delivery trucks to provide off-street facilities for access and parking.

CIRC/STR-P-33 Provide new transportation facilities as needed based on existing usage and future demand.

CIRC/STR-P-34 Minimize the impacts of land use development on the circulation system.

Review all development plans, rezoning applications, and proposed general plan amendments with respect to their impact on the transportation system, and require revisions as necessary.

CIRC/STR-P-35 Require new development and expansion of existing development in incorporated areas to fully provide for on-site transportation facilities including streets, curbs, traffic control devices, etc. Within unincorporated areas street improvements will be determined by County Ordinance.

CIRC/STR-P-36 Prevent streets and intersections from degrading below Level of Service "C" where possible due to physical constraints (as defined in a Level of Service Standard) or when the existing Level of Service is below "C" prevent where possible further degradation due to new development or expansion of existing development with a three part mitigation program:
adjacent right-of-way dedication, access improvements and/or an area-wide impact fee. The area-wide impact fee would be used where the physical changes for mitigation are not possible due to existing development and/or the mitigation measure is part of a larger project, such as freeways, which will be built at a later date.

CIRC/STR-P-37 Require new development and expansion of existing development to pay for necessary access improvements, such as street extensions, widenings, turn lanes, signals, etc., as identified in the transportation impact report as may be required for a project.

CIRC/STR-P-39 Require new development and expansion of existing development to pay or participate in its pro rata share of the costs of expansions in area-wide transportation facilities and services which it necessitates.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-4
CIRC/BIKE-P-1 Require bicycle facilities to be designed in accordance with the State Bikeway Design Criteria,
CIRC/BIKE-P-5 Consider bicycle safety when implementing improvements for automobile traffic operations.

CIRC/BIKE-P-7 Provide bicycle parking facilities at activity centers such as shopping centers, employment sites, and public buildings.

CIRC/PARK-G-2 Satisfy parking requirements in all new developments (residential, commercial, industrial, etc.) through off-street facilities.

CIRC/PARK-P-3 Ensure that adequate on-site parking supply and parking lot circulation is provided on all site plans in accordance with the adopted parking standards.

4.16.2 Environmental Setting
The Project is proposed to be developed in two phases on an approximately 46-acre site. The Project Site consists of a single legal parcel (APN 368-010-05) and is currently undeveloped. The L-shaped property is generally located along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.

Roadway Network
Locally significant roadways located near the Project are discussed below. Their buildout classifications are identified per the General Plan.
• Brimhall Road functions as a four (4)-lane collector from Jewetta Avenue to Coffee Road.

The buildout classification for Brimhall Road is an arterial from Jewetta Avenue to Calloway Drive and a collector between Calloway Drive and Coffee Road. • Calloway Drive functions as a six (6)-lane arterial from Meacham Road to CA-58 and Brimhall Road to Westside Parkway eastbound (EB) ramps, and a four (4)-lane arterial from CA-58 to Brimhall Road. The buildout classification for these segments of Calloway Drive is an arterial.
• Coffee Road functions as a six (6)-lane arterial from Olive Drive to Stockdale Highway.

The buildout classification for this segment of Coffee Road is an arterial. • Rosedale Highway functions as a four (4)-lane arterial from Old Farm Road to Verdugo Lane and a six (6)-lane arterial from Verdugo Lane to Fruitvale Road. The buildout classification for these segments of Rosedale Highway is an arterial.

Transit Service
The Golden Empire Transit (GET) District is the main transit agency servicing the City. Currently, GET operates buses on the following three (3) routes within the vicinity of the Project:
• Route 61 operates seven days a week and connects the Project Site to Bakersfield College to the east and California State University at Bakersfield to the south. Bus stops for Route 61 are currently located across the Project Site, east of the intersection of Northwest Promenade and CA-58 for eastbound travel and along the west side of Coffee Road, south of Granite Falls Drive for southbound travel. Pedestrian accessibility and Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-5
connectivity from the Project Site to these bus stops within a half mile walking distance is provided along both sides of CA-58 and the west side of Coffee Road. • Route 82 operates seven days a week and connects the Project Site to Liberty High School, Bakersfield Christian High School and California State University at Bakersfield to the west and south, and to the Downtown Transit Center to the east. Bus stops for Route 82 are currently located along CA-58 at Northwest Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the Project Site to these bus stops within a half-mile walking distance is provided along both sides of CA-58. • Route 84 operates seven days a week and connects the Project Site to Frontier High School to the west and the Downtown Transit Center to the east. Bus stops for Route 84 are currently located along CA-58 at Northwest Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the Project Site to these bus stops within a half-mile walking distance is provided along both sides of CA-58.

Pedestrian and Bicycle Facilities
Pedestrian facilities near the Project Site include sidewalks along both sides of Rosedale Highway, both sides of Coffee Road north of Jet Way and the west side of Coffee Road south of Jet Way. Pedestrian crosswalks are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes are provided in both directions along Rosedale Highway and Coffee Road.

Existing Vehicle Trips
As no active uses are currently present on the Project Site, there are no existing vehicle trips generated by the Project.

4.16.3 Impact Analysis
Methodology
To analyze the transportation impacts of the Project, IEG prepared the TIA and GTS prepared a VMT Analysis for the Project, which are included in Appendix H, Transportation, of this Draft EIR.

VMT Analysis
As discussed above, SB 743 initiated the removal of vehicle delay and LOS from consideration under CEQA. Instead, transportation impacts are to be evaluated based on a project’s VMT. The City has yet to adopt its own SB 743 guidelines; therefore, the VMT analysis was conducted using the methodology and significant threshold criteria identified in the California Governor’s Office of Planning and Research (OPR) Technical Advisory (TA). Prior to preparing the VMT Analysis for the Project, IEG considered screening criteria that would exempt the Project from having to complete a VMT analysis based on OPR (currently Governor’s Office of Land Use and Climate Innovation [LCI]) TA, dated December 2018. Given the size of the Project (retail uses greater than 50,000 square feet) and the estimated number of trips generated by the Project (approximately 13,185 daily trips), the Project does not qualify for VMT screening criteria for small projects, map-based screen for residential and office projects, local-serving retail, and other screening criteria for institutional uses and affordable housing. Therefore, the VMT Analysis includes a full VMT evaluation using the most recent Kern COG San Joaquin Valley Model Improvement Program Phase 3 (VMIP III) model.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-6
Kern COG VMIP III Model
The VMT analysis evaluated the Project using the 2020 and 2046 model years of the Kern COG VMIP III model, which is the most recent version of the travel model. Kern COG VMIP III is a socioeconomic data-based model and so the Project land uses must be converted into model socioeconomic data categories for modeling purposes. The Institute of Transportation Engineers (ITE), Trip Generation manual was used to convert the Project land uses’ square footage into number of employees. The ITE Trip Generation manual includes trips for land uses by different/multiple units (e.g., square feet, employees, rooms). Trip rates for both square footage and number of employees from the manual were used to estimate number of employees for land uses which in turn was used to estimate total project employees. All Project land uses were converted into employment based on ITE conversion process except the automated carwash.

Project-specific employment data for the proposed carwash was unavailable, and standard sources such as the ITE Trip Generation Manual do not provide employment estimates for this land use. Accordingly, a planning level assumption was applied, consisting of two employees per shift, two shifts per day, and one manager, for a total of five employees used for VMT modeling purposes. Therefore, an estimated total of 5 employees was used for the automated carwash.

More detailed discussion of the methodology used is provided in the VMT Analysis prepared by GTS in (Appendix H-2). Table 4.16-1: Project Employment Estimation, shows the employment conversion factors and total employment for the project land uses.

Table 4.16-1: Project Employment Estimation
Land Use Category Quantity Employees per
Land Use Unit Total Employees Model Employment Category Shopping Center 244.417 TSF 2.12 519 Retail
Medical Office 9.129 TSF 4.13 38 Medical
Drive-thru Restaurants 16.884 TSF 10.50 177 Food Industry Automated Carwash 4.1 TSF n/a 5 Retail
Public Storage 40 TSF 0.34 14 Industrial
Gas Filing Station 40 VFP 0.62 25 Retail
Shopping Center (Phase II)1

89.818 TSF 2.12 191 Retail
Total 969
Source: GTS, 2026.

Notes:

TSF = thousand square feet; VFP = vehicle fueling positions

1. The Shopping Center is proposed to be constructed in Phase II of the Project and all other land uses are proposed to be constructed in Phase I.

However, both phases were combined for the purposes of the VMT analysis.

VMT Evaluation
While the Project consists of multiple non-residential land uses, all the Project land uses can be considered retail land uses, except for the proposed medical office which was evaluated using a VMT per employee metric. Therefore, two separate methodologies are used to analyze all of the Project’s the retail uses and the medical office use.

Retail Land Use
According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric to analyze retail uses is the change in total roadway VMT within a defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “With Project” scenario is higher than the VMT estimated for the “Without Project” scenario. Given the Project’s location and size, it was determined that Kern County Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-7
(County) can be used as the region for the purposes of project VMT evaluation. Therefore, the Project retail uses would have a significant impact if there were a net increase in roadway VMT within the County between the “With Project” and “Without Project” scenarios.

Medical Office Land Use
The OPR TA recommends using VMT per employee as the appropriate metric for evaluating office land uses. For the medical office uses, the Project’s medical office would have a significant impact if the project VMT per employee is greater than 85 percent of the County’s baseline average VMT per employee. Consistent with the retail analysis, Kern County was defined as the region for this evaluation.

Pedestrian and Bicycle Facilities VMT Reductions
As the Project incorporates and expands active transportation facilities for pedestrians and bicyclists, the VMT analysis accounts for potential VMT reductions associated with these improvements. However, conventional travel demand models are not well suited to quantify VMT reductions resulting from localized mode shift attributable to enhanced active transportation infrastructure. Accordingly, supplemental off-model calculations were conducted to estimate VMT reductions associated with the proposed Project improvements. These off-model calculations follow the methodologies and default assumptions outlined in the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (October 2024). Specifically, the impact analysis below considers VMT reductions for providing the proposed end-of-trip bicycle facilities, pedestrian network improvements, and bicycle facility improvements included in the Project.

Level of Service Analysis
As identified in the General Plan Circulation Element policies in Section 4.16.1 above, new development projects within the City are required to provide needed infrastructure improvements to meet the demand created by the development and provide off-site improvements designed to ensure construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements, and the project will pay its fair share contribution towards the cost of these improvements.

Although LOS is no longer used as a CEQA impact metric, intersection LOS analysis was performed for General Plan consistency and to inform local circulation planning. The City has required the preparation of the TIA to identify and document potential traffic deficiencies associated with implementation of the Project (Appendix H-1).

In coordination with City staff, the TIA identifies LOS deficiencies for compliance with the General Plan goals, which has established LOS “C” as the minimum allowable level of service at intersections and roadway segments. Therefore, if the addition of project traffic causes the following at any intersection or roadway segment within the Study Area established by the TIA, it will be considered deficient for the purposes of this analysis:
• Drops to LOS D or worse
Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-8
• Operates at LOS D or worse under pre-project conditions and project traffic lowers the LOS below pre-project conditions
• For intersections only, an increase in delay per vehicle greater than 5 seconds when operating at LOS D or worse in pre-project conditions
Study Area
The Study Area includes the following key intersections and roadway segments.

Intersections

1. Patton Way and Rosedale Highway

2. Coffee Road and Rosedale Highway

3. Northwest Promenade/Project Driveway and Rosedale Highway

4. El Toro Viejo Road/Clay Patrick Farr Way and Rosedale Highway

5. Calloway Drive and Rosedale Highway

6. Verdugo Lane and Rosedale Highway

7. Old Farm Road and Rosedale Highway

8. Coffee Road and Brimhall Road

9. Harvest Creek Road and Brimhall Road – not collector

10. Calloway Drive and Brimhall Road

11. Verdugo Lane and Brimhall Road

12. Jewetta Avenue and Brimhall Road

13. Old Farm Road and Brimhall Road

14. Allen Road and Brimhall Road

15. Coffee Road and Olive Drive

16. Coffee Road and Hageman Road

17. Coffee Road and Riverlakes Drive/Meany Avenue

18. Coffee Road and Downing Avenue

19. Coffee Road and Granite Falls Drive

20. Coffee Road and Jet Way/Project Driveway

21. Coffee Road and Westside Parkway (CA-58) EB Ramps

22. Coffee Road and Truxtun Avenue

23. Coffee Road/Gosford Road and Stockdale Highway

24. Calloway Drive and Noriega Road

25. Calloway Drive and Hageman Road

26. Callaway Drive and Meacham Road
Roadway Segments

1. Rosedale Highway between Old Farm Road and Verdugo Lane

2. Rosedale Highway between Verdugo Lane and Calloway Drive

3. Rosedale Highway between Calloway Drive and El Toro Viejo Road/Clay Patrick Farr Way

4. Rosedale Highway between El Toro Viejo Road/Clay Patrick Farr Way and Project Driveway/Northwest Promenade

5. Rosedale Highway between Project Driveway/Northwest Promenade and Coffee Road

6. Rosedale Highway between Coffee Road and Patton Way

7. Coffee Road between Olive Drive and Hageman Road

8. Coffee Road between Hageman Road and Meany Avenue/Riverlakes Drive

9. Coffee Road between Meany Avenue/Riverlakes Drive and Downing Avenue

10. Coffee Road between Downing Avenue and Granite Falls Drive Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-9

11. Coffee Road between Granite Falls Drive and Rosedale Highway

12. Coffee Road between Rosedale Highway and Project Driveway/Jet Way

13. Coffee Road between Project Driveway/Jet Way and Brimhall Road

14. Coffee Road between Brimhall Road and Westside Parkway (CA-58) EB Ramps

15. Coffee Road between Westside Parkway EB Ramps and Truxtun Road

16. Coffee Road between Truxtun Road and Stockdale Highway

17. Calloway Drive between Noriega Road and Hageman Road

18. Calloway Drive between Hageman Road and Meacham Road

19. Calloway Drive between Meacham Road and Rosedale Highway

20. Calloway Drive between Rosedale Highway and Brimhall Road

21. Brimhall Road between Allen Road and Old Farm Road

22. Brimhall Road between Old Farm Road and Jewetta Avenue

23. Brimhall Road between Jewetta Avenue and Verdugo Lane

24. Brimhall Road between Verdugo Lane and Calloway Drive

25. Brimhall Road between Calloway Drive and Harvest Creek Road

26. Brimhall Road between Harvest Creek Road and Coffee Road

27. Hageman Road between Calloway Drive and Coffee Road Traffic Data Collection and Volume Development
Existing traffic conditions were established using weekday daily segment counts and intersection turning movement counts collected on February 20, 2025. This data provided the baseline for all future traffic volume projections.

Future roadway segment volumes were developed by applying compounded annual growth rates derived from comparisons between the Kern COG regional travel demand model Base Year 2020 and Future Year 2046 Model Improvement Program outputs. Intersection peak-hour forecasts were prepared using the Directional Volume Method described in the National Cooperative Highway Research Program (NCHRP) Report 255, which balances approach volumes at each intersection based on existing counts, forecasted segment volumes, and assumed travel patterns.

These procedures account for ambient growth, cumulative development, and planned regional transportation improvements.

Project Trip Generation and Distribution
Project trip generation was estimated using rates and methodologies from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition. Trip-generating land uses were quantified based on proposed development characteristics. Project trip distribution was developed based on surrounding land uses, regional access patterns, planned roadway connections, and existing traffic flow characteristics within the study area.

Project trip distribution and assignment were developed, in coordination with City staff, based on the land use characteristics of the proposed Project and surrounding area, existing travel patterns within the study area, anticipated travel patterns to and from the Project Site, and approved projects located in the vicinity of the Project Site. Project scenarios and study area were then established in coordination with City staff to determine the potential project deficiencies on the transportation network.

Where appropriate, fitted curve equations were used for specific uses such as the medical office land use, and locally supported survey data was applied for land uses including gasoline fueling stations and automated carwash facilities. Internal capture reductions among compatible land uses were calculated following procedures outlined in NCHRP Report 684 and the ITE Trip Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-10
Generation Handbook. Pass-by reductions were applied using ITE guidance to reflect trips already on the surrounding roadway network. Resulting daily and peak hour trips reflect conservative assumptions consistent with professional practice and City standards Table 4.16-2: Project Trip Generation summarizes the calculated trip generation based on the land use units associated with the Project phases. As shown on Table 4.16-2, the Project is anticipated to generate approximately 13,185 total daily trips, 676 AM peak hour trips and 1,183 PM peak hour trips.

Table 4.16-2: Project Trip Generation
Land Use1
AM Peak Hour PM Peak Hour
Intensity 2In Out Total In Out Total Daily

PHASE I PROJECT COMPONENTS
Shopping Center 244.417 TSF 152 95 247 420 436 856 8,894 Pass-by Reduction (29% - PM Peak Hour & Daily) 5 0 0 0 122 126 248 2,579 Subtotal 152 95 247 298 310 608 6,315
Medical Office 9.129 TSF 22 6 28 8 20 28 295
Internal Capture (18% - AM In, 83% - AM Out, 50% - PM In, 25% - PM Out, 32% - Daily)4 4 5 9 4 5 9 94
Subtotal 18 1 19 4 15 19 201
Fast Food Restaurant w/ Drive-Thru Window 16.884 TSF 286 275 561 277 256 533 7,566 Internal Capture (22% - AM In, 15% - AM Out, 29% - PM In, 42% - PM Out, 35% - Daily) 63 41 104 80 108 188 2,648
Pass-by Reduction (50% - AM Peak Hour, 55% - PM Peak Hour & Daily 112 117 229 108 81 189 2,705
Subtotal 111 117 228 89 67 156 2,213
Automated Carwash 1 Tunnel 34 34 68 57 57 114 1,447
Internal Trip Capture Shared with Costco Fuel (Per Costco Data)6 22 22 44 40 40 80 1,025
Pass-by Reduction (Per Costco Data) 8 8 16 12 12 24 295 Subtotal 4 4 8 5 5 10 127
Self-Storage 40 TSF 2 1 3 3 3 6 52
Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily) 0 0 0 0 0 0 5
Subtotal 2 1 3 3 3 6 47
Gasoline Service Station 40 VFP 285 285 570 410 410 820 10,196 Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily) 23 37 60 41 29 70 816
Pass-by Reduction (Per Costco Data) 216 214 430 293 292 585 7,316 Subtotal 46 34 80 76 89 165 2,064
PHASE I TOTAL 333 252 585 475 485 960 10,865

PHASE II PROJECT COMPONENTS
Shopping Center 89.818 TSF 56 35 91 154 160 314 3,268
Pass-by Reduction (29% - PM Peak Hour & Daily)
5 0 0 0 45 46 91 948
PHASE II TOTAL 56 35 91 109 114 223 2,320
PHASE I & PHASE II (PROJECT) TOTAL 389 287 676 584 599 1,183 13,185 Source: IEG, 2026.

Notes:
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 12th Edition (2025). 2 TSF = Thousand Square Feet; VFP = Vehicle Fueling Positions Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-11
Land Use1
AM Peak Hour PM Peak Hour
Intensity 2In Out Total In Out Total Daily
3 Peak hour and daily trip rates for Medical Office use are based on fitted curve equations for total 9,129 sf of medical office proposed for entire project.
4 Internal capture calculations are included in Appendix H 5 Pass-by reduction percentage is based on the ITE methodology per 2025 Pass-By Tables for ITE Trip Generation Appendices. Refer to Appendix A 6 ADT and Peak Hour rates are based on Costco survey data Included in Attachment H Study Scenarios
The TIA analyses the intersections and roadway segments operating conditions which were selected for the following anticipated timeframe scenarios:
• Existing Conditions (Year 2025)
• Year 2027 Cumulative Conditions
• Year 2027 Cumulative + Project Phase I Conditions
• Year 2028 Cumulative Conditions
• Year 2028 Cumulative + Project Phases I & II Conditions • Buildout Year (based on current Kern COG model) Conditions (Year 2046) • Buildout Year (based on currently Kern COG model) + Project Phases I & II Conditions Intersection Operations Analysis
Intersection operations were evaluated using Synchro Version 12 software based on methodologies in the Highway Capacity Manual, 7th Edition. Signalized intersection performance was measured using average control delay per vehicle.

Under the Existing Conditions (Year 2025) Scenario, all analyzed intersections are operating at an acceptable LOS except for the following intersections:
• Coffee Road and Rosedale Highway
• Calloway Drive and Rosedale Highway
• Coffee Road and Brimhall Road
• Coffee Road/Gosford Road and Stockdale Highway
• Coffee Road/Gosford Road and Stockdale Highway
Roadway Segment Capacity Analysis
Roadway segment operations were evaluated by comparing existing and projected average daily traffic (ADT) volumes to capacity thresholds identified in the General Plan Circulation Element.

Roadway capacities vary by functional classification (e.g., arterial or collector) and number of travel lanes. Volume-to-capacity ratios were used to identify segments operating below acceptable levels.

Under Existing Conditions (Year 2025) Scenario, all analyzed roadway segments are operating at an acceptable LOS except for the following roadway segments:
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-12
Queuing and Access Analysis
Site access intersections and key driveways were evaluated to ensure that projected vehicle queues would not exceed available storage lengths or adversely affect adjacent intersections.

Queuing analyses were conducted for each scenario, and recommended turn lane lengths or operational measures were identified where necessary.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance1to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities. • Conflict or be inconsistent with CEQA Guidelines §15064.3, subdivision (b). • Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment). • Result in inadequate emergency access.

Project Impacts
Threshold TRA-1: Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
Impact Analysis
The Project’s proposed commercial center would be consistent with the surrounding commercial uses as well as the amended General Plan designation and zoning district, thus implementing the City’s vision for the area. As further discussed in Section 4.11, Land Use and Planning, Threshold LUP-2, of this Draft EIR, the Project would be consistent with the applicable land use planning goals and policies contained in the General Plan.

Transit, Bicycle, and Pedestrian Facilities
Implementation of the Project would not impact any of the existing transit stops or propose new transit stops. The Project would include several pedestrian and bicycle improvements. The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers, new sidewalks along its frontages, and a new bicycle lane along Rosedale Highway which extends the existing facilities in the future. These would be designed in accordance with the State Bikeway Design Criteria consistent with General Plan policy CIRC/BIKE-P-1, and future implement General Plan policies CIRC/BIKE-P-5 and CIRC/BIKE-P-7 which promote bicycle safety and the implementation of bicycle parking facilities at shopping centers.

Roadway
As discussed in Methodology above, new development within the City is required to analyze LOS for nearby roadway segments and intersections that could be impacted by implementation of the 1 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-13
Project as required by the General Plan. Therefore, in coordination with City staff, the TIA prepared for the Project (Appendix H-1) evaluated the Study Area intersections and roadway segments identified above. The TIA identifies LOS deficiencies for compliance with the General Plan goals, which has established LOS “C” as the minimum allowable level of service at intersections and roadway segments. Therefore, for this analysis, Project impacts would be considered potentially significant if the Study Area intersections or roadway segments:
• Drops to LOS D or worse
• Operates at LOS D or worse under pre-project conditions and project traffic lowers the LOS below pre-project conditions
• For intersections only, an increase in delay per vehicle greater than 5 seconds when operating at LOS D or worse in pre-project conditions
The analysis contained with the TIA found the following LOS findings for the study scenarios:

Year 2027 and Year 2028 Cumulative Scenario. Under these scenarios, four intersections would be operating at an unacceptable LOS; however, the deficient intersection locations with the addition of the Project will not add more than 5 seconds of delay. Therefore, no transportation improvements are required at these locations. Three roadway segments were identified to be deficient under this scenario, including:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional RTIF Program. However, the Project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional impact would occur and no mitigation is required.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements would be required as part of the Project.

Buildout Year 2046 Scenario. Under this scenario, all analyzed intersections would operate at an acceptable LOS under the Buildout Year 2046 scenario except for the following:
• Coffee Road and Rosedale Highway
• Calloway Drive and Rosedale Highway
• Coffee Road and Brimhall Road
• Coffee Road/Gosford Road and Stockdale Highway
• Coffee Road & Project Dwy F
• Coffee Road & Project Dwy H
Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-14
Deficient roadway intersections Coffee Road and Rosedale Highway, Calloway Drive and Rosedale Highway, Coffee Road and Brimhall Road, Coffee Road/Gosford Road and Stockdale Highway with the addition of the Project will not add more than five seconds of delay. The Project driveways intersections would improve with installation of traffic signals; however, a traffic signal is not warranted at either location. As such, no significant impact would occur and no mitigation is required.

The roadway segment analysis under this scenario found five deficient roadway segments, including:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Brimhall Road to Westside Parkway (CA-58) EB Ramps • Coffee Road between Westside Parkway (CA-58) EB Ramps to Truxtun Road • Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road As with the previous scenarios, the Project planned improvements with the Bakersfield RTIF Program, Project B62, would ensure that impacts are less than significant.

As discussed, the Project would be required to provide infrastructure improvements needed to meet the demand created by the development and provide off-site improvements designed to ensure the construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as the Bakersfield RTIF program. If the improvements are not identified in the RTIF, they are considered local improvements, and the project will pay its fair share contribution towards the cost of these improvements. All required improvements for the Project are already included as part of the design or would be funded by the Bakersfield RTIF program, which the Project applicant would be responsible for contributing to. Therefore, no additional improvements or mitigation would be required and the Project would be consistent with General Plan LOS requirements. As the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold TRA-2: Would the project conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)?
Impact Analysis
As discussed in Section 4.18.3, Methodology, OPR TA guidance recommends two different methodologies for evaluation of VMT for retail uses and for medical offices.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-15
Retail Land Uses
According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric to analyze retails uses is the change in total roadway VMT within a defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “With Project” scenario is higher than the VMT estimated for the “Without Project” scenario. Given the Project’s location and size, it was determined that the County can be used as the region for the purposes of project VMT evaluation. Therefore, the Project retail uses would have a significant impact if there were a net increase in roadway VMT within the County between the “With Project” and “Without Project” scenarios.

Table 4.16-3: Retail Land Uses Project VMT shows the total roadway VMT within the County for both scenarios under the base year (2020) and cumulative/horizon year (2046) conditions.

The total roadway VMT for Year 2028 values (With Project and Without Project VMT) were estimated using linear interpolation of 2020 and 2046 VMT numbers.

Table 4.16-3: Retail Land Uses Project VMT
Daily Countywide
Roadway VMT Year With Project Without Project Difference (VMT) Difference (Percentage) 2020 30,554,590 30,503,375 51,215 0.17 %
2028 32,624,519 32,582,785 41,733 0.13 %
2046 37,281,858 37,261,458 20,399 0.05 %
Source: GTS, 2026.

Medical Office Land Use
The OPR TA recommends using VMT per employee as the appropriate metric for evaluating office land uses. Under this guidance, an office project would have a significant impact if its VMT per employee exceeds 85 percent of the regional baseline average. Therefore, the Project’s medical office would have a significant impact if the project VMT per employee is greater than 85 percent of the County’s baseline average VMT per employee. Consistent with the retail analysis, the County was defined as the region for this evaluation.

Table 4.16-4: Medical Office Land Use Project VMT presents the VMT per employee estimates for the Project’s medical office use.

Table 4.16-4: Medical Office Land Use Project VMT
Base Year (2020)1 Project (Medical Office) Kern County
Kern County
Significance Threshold2
Total Employees (non-retail) 38 30,503,375 51,215
Homebased Work (HBW) VMT 571 32,582,785 41,733
HBW VMT per Employee3

15.13 16.52 14.04
Percentage above Significance
Threshold 7.76 % - -
Source: GTS, 2026.

Notes:

1. Estimated using “No Project” base year (2020) model run.

2. 85% of baseline regional average.

3. Calculated by dividing the HBW VMT by the total number of employees.

As demonstrated above in Table 4.16-3 and Table 4.16-4, the Project would result in a net increase in countywide roadway VMT under both existing and cumulative conditions, and that the Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-16
Project’s medical office component would exceed the applicable VMT per employee threshold.

Accordingly, the Project would result in a potentially significant VMT impact under CEQA.

VMT Percentage Reduction
The VMT Analysis prepared for the Project also considered potential VMT reductions from the Project’s proposed pedestrian and bicyclist facilities. As discussed above, default assumptions outlined in the CAPCOA Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity were used to calculate potential VMT reductions.

The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers.

Consistent with CAPCOA Measure T-10, Provide End-of-Trip Bicycle Facilities, the provision of these facilities can achieve a reduction in employee commute VMT corresponding to a 0.1 percent to 4.4 percent reduction in greenhouse gas emissions.

The Project also proposes new sidewalks along its frontages, improving pedestrian connectivity and walkability. Based on CAPCOA Measure T-18, Provide Pedestrian Network Improvements, the provision of sidewalks and an enhanced pedestrian network can result in up to a 6.4 percent reduction in greenhouse gas emissions associated with household vehicle travel at the plan or community level.

Additionally, the Project proposes a new bicycle lane along Rosedale Highway, extending an existing facility and improving overall bicycle network connectivity. Consistent with CAPCOA Measure T-19-A, Construct or Improve Bicycle Facility, this improvement can achieve up to a 0.8 percent reduction in greenhouse gas emissions from displaced vehicle travel on roadways parallel to the bicycle facility. In addition, CAPCOA Measure T-19-B, Construct or Improve Bike Boulevard, indicates that bicycle-oriented corridor enhancements can result in up to a 0.2 percent reduction in greenhouse gas emissions from displaced vehicle travel.

Conclusion
As discussed above, the Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies that are consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with CAPCOA methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the Project’s location and operational characteristics. However, the reduction in VMT from the design features would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant impact.

No other feasible mitigation is available.

Mitigation Measures
No feasible mitigation is available.

Level of Significance After Mitigation
Significant and unavoidable impact.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-17
Threshold TRA-3: Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
Impact Analysis
As further discussed in Chapter 2, Project Description, of this Draft EIR, vehicular access to the Project Site would be provided via a proposed driveway along El Toro Viejo Road; three right-in/right-out only driveways and a signalized driveway along Rosedale Highway; and two right-in/right-out only driveways and a signalized driveway along Coffee Road. The signalized driveways would function as the main entries into the Project Site with secondary access provided via the non-signalized driveways. Combined, the proposed driveways would provide a direct connection to the comprehensive drive aisle system proposed within the parking areas of the Project Site.

Proposed off-site improvements include modification to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping). For the existing signalized intersection of Rosedale Highway and Northwest Promenade, which is the street that provides vehicular access to the commercial retail center north of the Project Site, no improvements or modifications to the traffic signal poles/structures would occur. However, a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) would be modified to provide a dedicated left-turn lane for west-bound traffic entering the Project Site at the signalized intersection. Other roadway improvements at this intersection would include striping.

Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which is toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas. The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the Bakersfield Fire Department (BFD) and the Kern County Fire Department (KCFD), which have an existing Joint Powers Agreement (JPA) to provide emergency services to the Project Site.

As discussed in Methodology, above, a project access vehicular queuing analysis was included in the TIA. This analysis was prepared to determine whether implementation of the Project would result in vehicle queuing that would cause hazardous conditions on surrounding roadways. This analysis found that the Project access points will not experience vehicular excess demand except at Coffee Road & Project Driveway G/Jet Way intersection, which is a main access point being constructed to the development. However, the Project would implement a dual left turn lane with 250 foot lanes at this location and as such, no queuing hazard would occur.

Sight distance at each project access point should be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. In consideration of regulatory requirements and the improvements the Project would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-18
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold TRA-4: Would the project result in inadequate emergency access? Impact Analysis
As discussed above, vehicular access to the Project Site would be provided via a proposed driveway along El Toro Viejo Road; three right-in/right-out only driveways and a signalized driveway along Rosedale Highway; and two right-in/right-out only driveways and a signalized driveway along Coffee Road. The signalized driveways would function as the main entries into the Project Site with secondary access provided via the non-signalized driveways. The Project would also include off-site improvements to the existing signalized intersections of Coffee Road and Jet Way as well as modifications to a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) to provide a dedicated left-turn lane for west-bound traffic entering the Project Site at the signalized intersection.

Construction
Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Additionally, the Project would include the preparation and implementation of a Construction Traffic Management Plan as a PDF.

The Construction Traffic Management Plan would be submitted to the City for review and approval prior to construction and would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures; provisions for maintaining pedestrian, bicycle, transit, and vehicular access to adjacent properties to the maximum extent feasible; methods to avoid or minimize lane closures and sidewalk closures; advance notification procedures for nearby property owners and affected agencies; dust, debris, and mud track-out control measures affecting adjacent roadways; and procedures to maintain emergency vehicle access at all times during construction. Implementation of the Construction Traffic Management Plan would reduce the potential for temporary construction-related conflicts with emergency response by ensuring that access is maintained, construction traffic is managed in an orderly manner, and potentially disruptive activities are coordinated in advance with the City and emergency service providers.

Operation
The Project would receive fire protection services through an existing JPA with BFD and KCFD.

Calls for service from the Project Site would be addressed by BFD and KCFD. The Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the City and BFD. BFD would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements, which would enhance emergency access to the Project Site. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan. Through compliance with Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-19
City, KCFD and BFD access requirements and, adequate emergency access to the Project Site would be provided. Project impacts concerning emergency access would be less than significant.

Project Design Features
Project Design Feature TRAF-PDF-1: Construction Traffic Management Plan.

The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfieldfor approval.

The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent feasible so as to avoid worker trips during those peak hours. • Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained. • Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be performed on Sundays and holidays. • Reduce the potential of trucks waiting for extended periods to load or unload. • Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during traffic rerouting and deliveries. • Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and loading/unloading on the Project Site. • Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclist and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public. • Identification of a construction manager and provision of a telephone number for any inquiries or complaints from residents regarding construction activities. The telephone number shall be posted at the site readily visible to any interested party during site preparation, grading, and construction.

Mitigation Measures
None required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-20
Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Transportation. For purposes of this analysis, the geographic scope would be the City of Bakersfield.

As described under Threshold TRA-1, the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. The Project site would be served by existing transit systems and would not conflict with existing transit. Moreover, the Project would implement pedestrian and bicycle facility improvements consistent with the General Plan. Additionally, the analysis in this section demonstrates that the Project would be consistent with LOS requirements of the General Plan through the Project’s improvements and contributions to the Bakersfield RTIF program.

Development within the Project area would be required to comply with all applicable program, plans, ordinances, or policies addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. Therefore, the Project in combination with the related projects would result in less than significant cumulative impacts in respect to identified programs, plans, policies, and ordinances.

Similar to the Project any related project that would be subject to environmental review would be required to evaluate VMT on a project-by-project basis. If the related project were determined to have potentially significant VMT impacts, it would be required to include appropriate mitigation measures to reduce VMT impacts to a less than significant level if available. The Project would result in a significant and unavoidable impact to VMT. Given that the Countywide cumulative VMT is already significant, the Project’s significant and unavoidable impact would be cumulatively considerable.

With regard to design hazards, the Project would not result in a significant impact for geometric hazards. The proposed Project driveways and internal drive aisles for the proposed Project and others would be constructed pursuant to the City’s design standards and subject to review by BFD. In addition, all circulation improvements would be constructed as approved by the City’s Public Works Department. Additionally, sight distance at each project access point should be reviewed with respect to standard Caltrans sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Therefore, the Project’s contribution to cumulative impacts associated with hazardous design conditions would not be considerable.

With regard to emergency access, the Project would not result in a significant impact. The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by BFD which would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements. The Project Site and the surrounding area are located in an established urban area that is well-served by the surrounding roadway network, and multiple routes exist in the area for emergency vehicles and evacuation.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-21
Furthermore, each of the related projects would be required to comply with City access requirements. As such, cumulative impacts on transportation would be less than significant.

Mitigation Measures
No mitigation measures are available.

Level of Significance After Mitigation
Project-specific and cumulative impacts related to conflicts with transportation-related plans, increased hazards due to geometric design, and inadequate emergency access would be less than significant. While Project-specific and cumulative impacts related to VMT would be reduced due to the Project’s features and improvements, impacts would remain significant and unavoidable.
.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-22
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.17-1

4.17 Tribal Cultural Resources
This section discusses potential impacts to tribal cultural resources associated with the proposed Project. Impacts are evaluated based on the Project’s potential to result in substantial adverse change in the significance of a tribal cultural resource (TCR) as defined in Public Resources Code (PRC) Section 21074. PRC Section 21074(a) states:
(a) “Tribal cultural resources” are either of the following:
(1) Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following
(A) Included or determined to be eligible for inclusion in the California Register of Historical Resources.
(B) Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.
(2) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.
(b) A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.
(c) A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal cultural resource if it conforms with the criteria of subdivision (a).

Per the requirements of AB 52/SB 18, public agencies must consult with California Native American tribes during the CEQA process in order to identify potential impacts to TCRs. Upon receiving NOP, the NAHC provided a response detailing the AB 52/SB 18 consultation process on October 31, 2025. The process for consultation follows this process:
• A California Native American Tribe asks agencies in the geographic area with which it is traditionally and culturally affiliated to be notified about projects. Tribes must ask in writing for consultation.
• Within 14 days of deciding to undertake a project or determining that a project application is complete, the lead agency must provide formal written notification to all Tribes who have requested it.
• A Tribe must respond within 30 days of receiving the notification if it wishes to engage in consultation.
• The lead agency must initiate consultation within 30 days of receiving the request from the Tribe.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-2
• Consultation concludes when both parties have agreed on measures to mitigate or avoid a significant effect to a TCR, or a party, after a reasonable effort in good faith, decides that mutual agreement cannot be reached.
• Regardless of the outcome of consultation, the CEQA document must disclose significant impacts on TCRs and discuss feasible alternatives or mitigation that avoid or lessen the impact.

4.17.1 Regulatory Setting
State
California Register of Historical Resources (Public Resource Code Section 5024.1 et seq.) State law protects cultural resources by requiring evaluations of the significance of historical resources in CEQA documents. A cultural resource is an important historical resource if it meets any of the criteria found in section 15064.5(a) of the State CEQA Guidelines. The California Register of Historic Resources (CRHR) is maintained by the state Office of Historic Preservations.

The following resources are automatically included in the CRHR: properties listed, or formally designated eligible for listing, on the National Register of Historic Places; state historical landmarks; and points of interest recommended for listing in the CRHR by the State Historical Resources Commission (SHPO). Additionally, resources included in a local register of historical resources or deemed significant are presumed to be historically or culturally significant for purposes of CEQA.

For purposes of CEQA, a historical resource is any object, building, structure, site, area, place, record, or manuscript listed in or eligible for listing in the CRHR (Public Resources Code [PRC] section 21084.1). A resource is eligible for listing in the CRHR if it meets any of the following criteria:

1. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

2. Is associated with the lives of persons important in our past.

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.

4. Has yielded, or may be likely to yield, information important in prehistory or history.

The California Code of Regulations (CCR) further provides that cultural resources of local significance are CRHR-eligible (Title 14 CCR, section 4852).

Assembly Bill 52 (Public Resources Code Section 21080.3.1) The Native American Historic Resource Protection Act (AB 52) took effect July 1, 2015, and incorporates tribal consultation and analysis of impacts to TCRs into the CEQA process. It requires TCRs to be analyzed similar to other CEQA topics and establishes a consultation process for lead agencies and California Tribes. Projects that require a Notice of Preparation of an EIR or Notice of Intent to adopt a ND or MND are subject to AB 52. A significant impact on a TCR is considered a significant environmental impact, requiring adoption and implementation of feasible mitigation measures.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-3
As described above, TCRs are defined in one of two ways. Either the TCR qualifies as a historical resource according to PRC § 5024.1, or the TCR is defined by the lead agency, as long as the lead agency supports its determination with substantial evidence and considers the resource’s significance to a California Tribe. PRC § 21080.3.1(b) establishes the process for engaging in consultation with California Native American Tribes. The following describes the process for consultation:
(b) Prior to the release of a negative declaration, mitigated negative declaration, or environmental impact report for a project, the lead agency shall begin consultation with a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project if:
(1) the California Native American tribe requested to the lead agency, in writing, to be informed by the lead agency through formal notification of proposed projects in the geographic area that is traditionally and culturally affiliated with the tribe, and (2) the California Native American tribe responds, in writing, within 30 days of receipt of the formal notification, and requests the consultation. When responding to the lead agency, the California Native American tribe shall designate a lead contact person. If the California Native American tribe does not designate a lead contact person, or designates multiple lead contact people, the lead agency shall defer to the individual listed on the contact list maintained by the Native American Heritage Commission for the purposes of Chapter 905 of the Statutes of 2004. For purposes of this section and Section 21080.3.2, “consultation” shall have the same meaning as provided in Section 65352.4 of the Government Code.
(c) To expedite the requirements of this section, the Native American Heritage Commission shall assist the lead agency in identifying the California Native American tribes that are traditionally and culturally affiliated with the project area. (d) Within 14 days of determining that an application for a project is complete or a decision by a public agency to undertake a project, the lead agency shall provide formal notification to the designated contact of, or a tribal representative of, traditionally and culturally affiliated California Native American tribes that have requested notice, which shall be accomplished by means of at least one written notification that includes a brief description of the proposed project and its location, the lead agency contact information, and a notification that the California Native American tribe has 30 days to request consultation pursuant to this section. (e) The lead agency shall begin the consultation process within 30 days of receiving a California Native American tribe’s request for consultation.

Senate Bill 18, (SB18) Traditional Tribal Cultural Places Act Senate Bill 18 (SB 18) requires local (city and county) governments to consult with California Native American tribes to aid in the protection of traditional tribal cultural places (“cultural places”) through local land use planning. SB 18 also requires the Governor’s Office of Planning and Research (OPR) to include in the General Plan Guidelines advice to local governments for how to conduct these consultations. The intent of SB 18 is to provide California Native American tribes an opportunity to participate in local land use decisions at an early planning stage, for the purpose of protecting, or mitigating impacts to, cultural places. The purpose of involving tribes at these early planning stages is to allow consideration of cultural places in the context of broad local land use policy, before individual site specific, project-level land use decisions are made by a local Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-4
government. SB 18 requires local governments to consult with tribes prior to making certain planning decisions and to provide notice to tribes at certain key points in the planning process.

This consultation and notice requirements apply to adoption and amendment of both general plans (defined in Government Code § 65300 et seq.) and specific plans (defined in Government Code §65450 et seq.). Although SB 18 does not specifically mention consultation or notice requirements for adoption or amendment of specific plans, existing state planning law requires local governments to use the same processes for adoption and amendment of specific plans as for general plans (see Government Code § 65453). Therefore, where SB 18 requires consultation and/or notice for a general plan adoption or amendment, the requirement extends also to a specific plan adoption or amendment.

California Health and Safety Code (Section 7050.5)
The State of California regulates the accidental discovery of human remains. Section 7050.5 of the Health and Safety Code states:

In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation…until the coroner…has determined…that the remains are not subject to…provisions of law concerning investigation of the circumstances, manner and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible. The coroner shall make his or her determination with two working days from the time the person responsible for the excavation, or his or her authorized representative, notifies the coroner of the discovery or recognition of the human remains. If the coroner determines that the remains are not subject to his or her authority and…has reason to believe that they are those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

Bakersfield Register of Historic Places
The City of Bakersfield has established the Bakersfield Register of Historic Places (BRHP) includes properties within city limits that are listed in the National Register of Historic Places (NRHP), as well as locally designated Cultural Resources and Areas of Historic Interest.1 Any improvement, building, sign, feature, site, place, or object may be designated as a Cultural Resource and any grouping of such may be designated as a historic district or an area of historic interest if it meets one or more of the following criteria:
1 Historic Resources Group. 2025. City of Bakersfield Historic Resources Survey Report. https://content.civicplus.com/api/assets/ca-bakersfield/ba550d64-0acd-4521-bd0e-139bfabf36bd?cache=1800/ (Accessed June 24, 2026).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-5
a. It exemplifies or reflects special elements of the city, community or neighborhood’s historical, archaeological, cultural, social, economic, political, aesthetic, engineering or architectural development; or
b. It is identified with persons or events significant in local, state, or national history; or c. It embodies distinctive characteristics of style, type, period, or method of construction, or is a valuable example of the use of indigenous materials or craftsmanship; or d. It is representative of the notable work of a builder, designer, architect, engineer, landscape architect, interior designer, artist or craftsman; or e. Its unique location or singular physical characteristic(s) represents an established and familiar visual feature of a neighborhood, community or the city; or f. It is an archaeological or paleontological site which has the potential of yielding information of scientific value. 2

4.17.2 Environmental Setting
As described in Chapter 2, Project Description, the Project site is located in the northwestern portion of Bakersfield. The approximately 46.16-acre Project site is an undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.

None of the 31 Historic Places listed in the BRHP, CRHP, or NRHP 5 Historic Places listed in the NRHP within the City of Bakersfield are located within the Project Site. Additionally, the Project site is not located within any of the five potential Historic Districts identified in the 2025 Bakersfield Historic Resources Survey Report.
3 4.17.3 Impact Analysis
Methodology
For purposes of identifying potential sacred lands or traditional cultural properties within or near a project site, the City contacted the Native American heritage Commission (NAHC) to conduct a search of the Sacred Lands File (SLF) (see Section 4.6, Cultural Resources). The NAHC provided the City with a list of California Native American Tribes known to have knowledge of the area in which the proposed Project is located.

On March 26, 2026, the City initiated consultation pursuant to AB 52 and SB 18 with representatives of the California Native American Tribes identified by the NAHC. Tribes contacted included those within the jurisdiction of the City as well as those traditionally and culturally affiliated to the geographic area where a project is located. 2 Bakersfield Municipal Code Section 15.72.050
3 Historic Resources Group. 2025. City of Bakersfield Historic Resources Survey Report. https://content.civicplus.com/api/assets/ca-bakersfield/ba550d64-0acd-4521-bd0e-139bfabf36bd?cache=1800/ (Accessed June 24, 2026).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-6
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance4to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Cause a substantial adverse change in the significance of a TCR, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
o Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or
o A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Project Impacts
Threshold TCR-1: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)?
Threshold TCR-2: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Impact Analysis
As discussed in Appendix D, the existing structures and previously identified historic archaeological site on the Project Site have been determined to not be eligible for listing in either 4 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-7
the CRHR, or in a in a local register of historical resources. Therefore, the Project does not contain any resources that are likely to have historic significance.

A search of the SLF was conducted through the NAHC to determine if any sacred lands or traditional cultural properties on file with the NAHC were within or near the Project Site. The NAHC’s SLF record search was negative, indicating that there is no record of sacred lands on the Project Site.5
In compliance with AB 52/SB 18 the City provided formal notification to California Native American tribal representatives identified by the NAHC. Native American groups may have knowledge about the area’s cultural resources and may have concerns about a development’s adverse effects on TCRs.
6 AB 52/SB 18 allows tribes 30 days after receiving notification to request consultation. On March 26, 2026, the City contacted representatives of the following tribes:
• Santa Rosa Rancheria
• Kitanemuk & Yowlumne Tejon Indians
• Kawaiisu Tribe
• Tubaltulabals of Kern Valley
• Tule River Indian Tribe
• Chumash Council of Bakersfield
• Tejon Indian Tribe
• Kern Valley Indian Council
• Chalon Indian Council of Bakersfield
The above listed Tribes did not respond to the request for consultation and have opted out of the AB 52 and SB 18 consultation process. Therefore, the City has completed tribal consultation as provided for by AB 52/SB 18.
7 Outgoing correspondence to representatives is included in Appendix K, Tribal Correspondence though no response has been received.

Although no TCRs were identified in the Project Site, ground-disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2. MM CUL-1 would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation.

Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. MM CUL-2, would require a cessation of construction activity in the event of an inadvertent discovery of human remains until the County coroner can evaluate the discovery and made the necessary findings. MM CUL-2 would also provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of 5 Native American Heritage Commission. October 28, 2022. [Native American Heritage Commission Letter and Native American Tribal Consultation List].
6 California PRC section 21074
7 California PRC section 21080.3.2(b)(1)
Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-8
MM CUL-1 and MM CUL-2, impacts to TCRs remains would be less than significant with mitigation incorporated.

Mitigation Measures
The following mitigation measures are applicable to the Project and would be implemented to reduce impacts to a less than significant level.

MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.

MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5.

The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-9
Cumulative Impacts
The geographic scope of the cumulative TCRs analysis is the Project Site and surrounding area as evaluated in the CRA. Impacts to TCRs are generally site-specific because the integrity of any specific TCR is often dependent upon the activities occurring in its immediate vicinity. As discussed, no TCRs have been identified on the Project site, and thus, the Project would have neither a direct nor indirect impact on TCR. Accordingly, the Project would not contribute cumulatively to impacts to TCRs.

The cumulative projects identified in Section 3.3, Cumulative Development, would all likely require some level of excavation with potential for disturbance of subsurface archaeological resources or human remains. As discussed in discussion of Impact TCR-1 and Impact TCR-2, the proposed Project would implement MM CUL-1 and MM CUL-2 and comply with applicable regulations pertaining to the inadvertent discovery and proper treatment of these resources. This would reduce any potential impacts to less than significant. Likewise, the cumulative projects would be required to comply with applicable federal, State, and local regulations pertaining to these resources. Therefore, cumulative impacts are less than significant with mitigation incorporated.

Mitigation Measures
Implement MM CUL-1 and MM CUL-2.

Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with implementation of MM CUL-1 and MM CUL-2.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-10
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.18-1

4.18 Utilities and Service Systems
This section examines the public utilities and service systems that would be used by the Project and describes potential impacts due to the implementation of the Project. Information to support the analysis is based on the Water Supply and Demand Analysis prepared for the Project by Placeworks, May 2026, contained Appendix I-1 and the Sewer Area Study prepared by Kimley-Horn May 2026 contained in Appendix I-3. In addition, a technical report addressing energy was prepared for the Project and is included as Appendix B, Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.

4.18.1 Regulatory Setting
Federal
Federal Safe Drinking Water Act
The Safe Drinking Water Act (SDWA)(Pub. L. 93-523) is intended to protect public health by regulating the nation’s public drinking water supply. The SDWA authorizes the U.S.EPA to set national standards for drinking water to protect against both naturally occurring and man-made contaminants.

State
California Safe Drinking Water Act
The State’s Safe Drinking Water Act (Health & Saf. Code §§ 116270-116755), charges the California Department of Health Services (DHS) primary enforcement responsibility for the State’s drinking water supply. Title 22 of the California Code of Regulations (CCR) (Division 4, Chapter 15, “Domestic Water Quality and Monitoring Regulations”) established DHS authority and provides drinking water quality and monitoring requirements, which are equal to or more stringent than federal standards.

California Recycled Water Regulations
The regulation of recycled water is vested by State law in the State Water Resources Control Board (SWRCB) and the California Department of Public Health Services (DPH). DPH is responsible for regulating the use of recycled water. Title 17 (California Water Code, §§ 13500– 13556) regulates the protection of the potable water supply through the control of cross-connections with potential contaminants, including recycled water. The established water quality standards and treatment reliability criteria for recycled water are codified in Title 22 of the California Water Code. The requirements of Title 22, as revised in 1978, 1990, and 2001, establish the quality and/or treatment processes required for a recycled effluent to be used for a non-potable application. In addition to recycled water uses and treatment requirements, Title 22 addresses sampling and analysis requirements at the treatment plant, preparation of an engineering report prior to production or use of recycled water, general treatment design requirements, reliability requirements, and alternative methods of treatment.

Urban Water Management Planning Act
The Urban Water Management Planning Act (UWMP) (California Water Code, Division 6, Part

2.6, § 10610 et seq.) was enacted in 1983. The UWMP Act applies to municipal water suppliers that serve more than 3,000 customers or provide more than 3,000 acre-feet per year (AFY) of water. The UWMP Act requires these suppliers to update their Urban Water Management Plan Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-2
(UWMP) every five years to demonstrate an appropriate level of reliability in supplying anticipated short-term and long-term water demands during normal, dry, and multiple dry years.

Assembly Bill 1668 and Senate Bill 606 – May 31, 2018
AB 1668 and SB 606 establish guidelines for efficient water use and a framework for the implementation and oversight of water standards that were to be in effect in 2022. The two bills strengthen the State’s water resiliency in the face of future droughts with provisions that include:
• Establishing water use objectives and long-term standards for efficient water use that apply to urban retail water suppliers; comprised of indoor residential water use, outdoor residential water use, commercial, industrial and institutional (CII) irrigation with dedicated meters, water loss, and other unique local uses.
• Providing incentives for water suppliers to recycle water. • Identifying small water suppliers and rural communities that may be at risk of drought and water shortage vulnerability and provide recommendations for drought planning. • Requiring both urban and agricultural water suppliers to set annual water budgets and prepare for drought.

Senate Bill 610
SB 610 requires public water suppliers to prepare Water Supply Assessments (WSAs) for large-scale development projects before they can be approved. They are required for any project that is subject to CEQA and proposes (1) residential development of more than 500 dwelling units; (2) commercial development of more than 250,000 square feet of floor space; (3) a retail center with more than 500,000 square feet of floor space; (4) a hotel or motel having more than 500 rooms; (5) an industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area; (6) a mixed-use project that includes one or more of the projects specified above; or (7) a project that will demand an amount of water equal to, or greater than, the amount of water required by 500 dwelling units.

California Integrated Waste Management Act
The California Integrated Waste Management Act (Assembly Bill [AB] 939) was enacted in 1989 to reduce solid waste generated in California to the maximum extent feasible. AB 939 required counties, cities, and regional solid waste management agencies to develop plans and implement programs to divert 25 percent of their solid waste from landfills by 1995 and 50 percent by 2000.

Diversion is expected to be achieved through source reduction, recycling, and composting, and requires the participation of public agencies, as well as residential, commercial, and industrial users. Since 2000, subsequent legislation mandated that the 50 percent reduction goal be met annually.

AB 939 requires all California counties and cities to prepare solid waste management programs that include Source Reduction and Recycling Elements. Each jurisdiction is required to produce annual reports documenting steps taken to meet the requirements of AB 939.

California Solid Waste Reuse and Recycling Access Act
The California Solid Waste Reuse and Recycling Access Act of 1991 (AB 1327) required CalRecycle to prepare a model ordinance addressing storage of recyclable materials for Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-3
development projects. The model ordinance was intended to be adoption by California counties and cities to help them meet the requirements of AB 939. Under AB 1327, applications for building permits for development projects must include adequate and accessible areas for the collection and loading of recyclable materials.

CALGreen (California Green Building Code)
In an effort to reduce greenhouse gas emissions and fight against climate change, the State of California Green Building Code (CALGreen) took effect in 2011. CALGreen mandates energy efficiency, water efficiency, and resource conservation measures for all newly constructed commercial and residential projects. CALGreen applies to all residential, commercial, hospital and school buildings to ensure that every new building in California is built using environmentally advanced construction practices, including construction waste diversion requirements, as follows:
• Submit a Construction Waste Management Plan prior to construction for approval by the local Building Department.
• Recycle and/or Reuse a minimum of 65 percent of construction & demolition waste. • Recycle or Reuse 100 percent of tree stumps, rocks and associated vegetation and soils resulting from land clearing
Local
Metropolitan Bakersfield General Plan
The following goals and policies contained in Chapter X (10), “Public Services and Facilities Element,” of the Metropolitan Bakersfield General Plan (MBGP) (City of Bakersfield 2002) may be applicable to the Project.

General Utility Service
Goal 1: Maintain a coordinated planning and implementation program for the provision of public utilities to the planning area.

Policy 3: Municipal-type utility services within the city’s sphere of influence (or designated urban area) should be provided.

Policy 5: Require all new development to pay its pro rata share of the cost of necessary expansion in municipal utilities, facilities and infrastructure for which it generates demand and upon which it is dependent.

Water Distribution
Goal 1: Ensure the provision of adequate water service to all developed and developing portions of the planning area.

Policy 1: Reach agreement regarding mutually beneficial improvements in domestic water service and distribution facilities as required to improve overall metropolitan water service capabilities.

Policy 2: Continue to provide domestic water facilities which are contributed directly by developers, through development and/or availability fees.

Policy 3: Require that all new development proposals have an adequate water supply available.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-4
Sewer Service
Goal 1: Ensure the provision of adequate sewer service to serve the needs of existing and planned development in the planning area.

Goal 3: Provide trunk sewer availability to and treatment/disposal capacity for all metropolitan urban areas, to enable cessation or prevention of the use of septic tanks where such usage creates potential public health hazards or may impair groundwater quality, and to assist in the consolidation of sewerage systems. Provide sewer service for urban development regardless of jurisdiction.

Storm Drainage
Goal 2: Maintain a comprehensive storm drainage system which serves all urban development within the planning area.

Policy 2: The city and county should pursue individual drainage plans where they are most needed.

Solid Waste
Goal 1: Ensure the provision of adequate solid waste disposal services to meet the demand for these services in the planning area.

Goal 2: Evaluate, and develop as feasible, resource recovery and recycling systems.

Policy 1: Comply with, and update as required, the adopted county solid waste management plan.

4.18.2 Environmental Setting
The following sections describe existing utility services for the Project site. Utilities described include water supply, solid waste, wastewater, electricity and natural gas, and telecommunications.

Water Service Distribution
The City’s Water Resources Department operates a Domestic Water System and a Wholesale Water System. The Domestic Water System is a retail water supplier that operates under a service contract with California Water Service (Cal Water). The service area boundaries for the Domestic Water System include only a portion of the City of Bakersfield. Remaining areas of the City are served by other retail water suppliers. The primary source of supply for the Domestic Water System is groundwater and recharged surface water pumped from City owned wells. This is supplemented by surface water supplies from treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4’s (KCWA ID4). The surface water conveyed to the treatment water plants is from Kern River supplies and the State Water Project (SWP) supplies. In 2020, the City’s Domestic Water System service area consisted of 48,140 municipal connections and supplied a volume of 45,649 acre-feet (AF).

The City’s Wholesale Water System, which is also operated by the City’s Water Resources Department, oversees the City’s Kern River water rights and water supplies. The service area for this system includes all land within the City’s boundaries. The Kern River water supplies are transported though the Kern River channel and canal systems for delivery to Cal Water’s North Garden and Northeast Bakersfield Water Treatment Plants. The Henry C. Garnett Water Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-5
Purification Plant receives surface water from the SWP. When SWP supplies are not available, the City is able to deliver its Kern River supplies for treatment in place of SWP supplies. Kern water supplies are also delivered to groundwater replenishment areas such as the City’s 2,800- acre recharge facility. Kern River water that is replenished to the groundwater basin benefits the City and other retail water suppliers that operate groundwater wells. A volume of 77,528 AF of Kern River surface water was delivered through the Wholesale Water System in 2020.

The City also maintains approximately 400 stormwater basins that capture precipitation and recharge the groundwater basin. These stormwater basins are estimated to capture and recharge 16,000 acre-feet per year (afy) of stormwater runoff on average. Approximately 4,272 afy of additional stormwater runoff is captured and diverted into the Kern River and unlined canals annually. This captured stormwater becomes part of the City’s groundwater and recharged water supplies.

Additionally, wastewater generated within the Domestic Water System service area is collected and transported to the City’s Wastewater Treatment Plant (WWTP) No. 3, which provides undisinfected secondary and tertiary treatment. Undisinfected secondary effluent is stored in percolation ponds and used for agricultural irrigation. Tertiary treated effluent is used for landscape irrigation on City owned property. WWTP No. 3 serves areas located both within and outside of the Domestic Water System service area.

In 2020, 7,114 AF of undisinfected secondary effluent was delivered for agricultural irrigation use outside of the City’s service area on property owned by the City of Los Angeles. The amount of undisinfected secondary effluent disposed of in percolation ponds at the WWTP No.3 was 12,167 AF. The City used 664 AF of tertiary treated effluent as recycled water for irrigation of landscaping within the Bakersfield Sports Village, a City owned soccer and football complex located within the Domestic Water System service area. On July 17, 2019, the Bakersfield City Council voted not to renew its contract for sale of wastewater for agricultural irrigation use on the farmland owned by the City of Los Angeles when it expires in 2026. This will allow for additional recycled water to be used within the Domestic Water System service area in the future. The City is also planning an expansion of the tertiary treatment capacity at WWTP No. 3 from 2 million gallons per day (MGD) to 8 MGD.

Groundwater
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin by the California Department of Water Resources (DWR). It is not currently adjudicated.

The City, along with five other agencies, is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County Groundwater Sustainability Plan (GSP) which was adopted by DWR in December of 2024.

The GSP aims to maintain water levels above the Minimum Threshold levels to allow the City’s wells to meet the demands of the Domestic Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality. The City’s groundwater operations are subject to compliance with the requirements of the GSP.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-6
Future Water Projects
Optimization of the City’s Kern River supplies to promote the goals of the GSP involves the full use of the City’s available Kern River entitlement. The Kern River Conjunctive Use Optimization project would be implemented over time so that it can be adjusted to meet changing conditions.

The City’s Kern River supplies would be delivered as a first priority to meet demands of the surface water treatment plants with the remaining supplies being recharged to the groundwater basin through the Kern River channel, the 2,800 acre recharge facility, Truxtun Lake, and other City park facilities
Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the California State Water Resources Control Board (SWRCB). The Kern River was designated with Fully Appropriated Status (FAS) by the SWRCB in 1964.

However, in February 2010, SWRCB issued an order revising the status of the Kern River, finding that the river was no longer fully appropriated. In anticipation of this action, the City filed an application with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

The City’s intended use of unappropriated water is to have it remain in the Kern River watercourse to support multiple reasonable and beneficial uses, including domestic purposes, municipal and industrial uses, protection of the public interest, environmental purposes, streamflow restoration, constructed wetlands, recreational uses, fish and wildlife restoration, underground aquifer supply, aquifer water quality enhancement, and underground water banking for drought and other emergencies. The SWRCB has not taken action regarding the allocation of surplus, unappropriated Kern River supplies. It is anticipated that this water may be allocated in about 10 to 15 years. If additional Kern River supplies are allocated to the City, they would become a part of the conjunctive use optimization project.

Wastewater
Bakersfield is served by four major wastewater treatment plants. The City operates Wastewater Treatment Plants (WWTPs) Nos. 2 and 3. WWTP No. 2 is a trickling filter facility that serves the area east of State Route (SR) 99. It has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd. WWTP No. 3 is an activated sludge facility that serves the area west of SR 99, including the Project Site. It has a capacity of 32 mgd and a current average daily flow of 17.3 mgd. In 2010, WWTP No. 3 was upgraded, expanding from 16 mgd to 32 mgd capacity.

Additionally, portions of Bakersfield are also served by two smaller wastewater treatment plants operated by the Kern Sanitation Authority and North of River Sanitary District Number 1; these agencies own and maintain the sewer systems for their respective treatment.

Stormwater
Stormwater drainage policies for Bakersfield reflect the generally flat topography and limited rainfall of the area. While overall annual rainfall amounts are low, highly intense precipitation can occur in Bakersfield, leading to locally significant runoff. The County and City operate and maintain a joint storm drainage system serving metropolitan Bakersfield and a portion of the surrounding unincorporated area. This area is regulated by an NPDES permit; the City and County prepared a Storm Water Management Plan that describes the framework for managing stormwater discharges. As described above, the City maintains approximately 400 stormwater basins that capture precipitation and recharge the groundwater basin. These stormwater basins Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-7
are estimated to capture and recharge 16,000 acre-feet per year (afy) of stormwater runoff on average. Approximately 4,272 afy of additional stormwater runoff is captured and diverted into the Kern River and unlined canals annually.

Solid Waste
The City of Bakersfield’s Public Works Department Solid Waste Division provides garbage and recycling services to its residents and businesses. Solid waste from the City is transported to the Bena Landfill, which serves all residents within the City limits. The Bena landfill is located approximately 18 miles east of Bakersfield and has a projected 65-to-75-year lifespan and has been in operation since 2010 with a capacity of 70 million cubic yards. This landfill is owned and operated by Kern County. Additional landfills/solid waste services include the Mount Vernon Greenwaste Recycling Facility, which diverts waste from the Bena Landfill as recycled compost and mulch. Hazardous waste facilities are operated by Kern County through a household hazardous waste collection and refuse facility.1
Electricity and Natural Gas
Electrical services in Bakersfield are provided by Pacific Gas & Electric Company. Natural gas services in Bakersfield are provided by Pacific Gas & Electric Company and Southern California Gas Company.

Telecommunications
Broadband and cellular services are provided to residents and businesses from a variety of private companies, including national retailers Spectrum, AT&T, Verizon, and T-Mobile.2

4.18.3 Impact Analysis
Methodology
This analysis is based on the proposed Project’s forecasted utility usage as compared to the existing capacity of utility facilities that serve the Project Site.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects;
• Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years; 1 City of Bakersfield General Plan, Background Report, August 2022 2 City of Bakersfield General Plan, Background Report, August 2022 3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-8
• Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments;
• Generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals; • Comply with federal, state, and local management and reduction statutes and regulations related to solid waste.

Project Impacts
Threshold UTI-1: Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Impact Analysis
Project construction would not require connections to the City’s water or sewer infrastructure.

Construction of the Project would not require electricity to power most construction equipment.

The majority of construction equipment would be gasoline or diesel powered. It is not anticipated that construction equipment used for the Project would be powered by natural gas, and no other natural gas demand is anticipated during construction.

Operation of the Project would connect to existing water, sewer, stormwater, electrical, telecommunications, and natural gas service lines.

Wastewater generated by the Project would be collected and conveyed via the City of Bakersfield’s municipal sewer system, operated by the City’s Wastewater Division. The Project would be served by Wastewater Treatment Plant No. 3 which has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd.4 As noted in the Sewer Area Study prepared for the Project, the average daily wastewater generated by the Project would be 0.2588 cubic feet per second (cfs) or 167,240 gallons per day.

An existing 36-inch sewer main is located in El Toro Viejo Road. The sewer main traverses south across a vacant parcel and turns west on Brimhall Road and continues to Jewetta Avenue, where it increases in size to a 42-inch main and turns south. The 42-inch main continues south across the Kern River and increases in size to a 48-inch main at Bolthouse Drive. The 48-inch main continues south on Buena Vista Road until it turns east at McCutchen Road. The sewer main continues east to the sewer lift station located at the southeast corner of McCutchen Road and Gosford Road. Sewer flows from the Project would be conveyed onsite through an underground sewer main of various sizes, generally from east to west, connecting to the existing 36-inch main in El Toro Viejo Road. Sewer flows would be conveyed through the existing City system to the lift station at the southeast corner of McCutchen Road and Gosford Road. As noted in the Sewer Area study prepared for the Project, the Project would contribute only 2 percent of the existing sewer flow and 1 percent of the cumulative sewer flow.

Moreover, the Project’s wastewater generation would be well within the available capacity of the Wastewater Treatment Plant No. 3. It should be noted that the Project would comply with all 4 https://www.bakersfieldcity.us/679/Wastewater-Treatment-Plants?contentId=62e69a33-a683-423a-9f57-d6c9db926b18 Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-9
applicable federal, state, and local wastewater regulations, including the City’s sewer connection requirements and the treatment plants’ NPDES permits.

Regarding water, the Project would connect to an existing 8-inch pipe at Rosedale and Coffee Road. As analyzed Water Supply and Demand Analysis prepared for the Project, according to the City’s 2020 UWMP, the City has adequate supplies to serve all of its customers during normal, dry year, and multiple dry year conditions through 2040. The Project would result in a water demand of 148,925 gallons per day or 166.8acre-feet per year (afy). This is only 8.9 percent of the projected increase in the commercial sector water demand from 2020 to 2030, assuming a buildout date of the project of 2027.

Therefore, as determined in the Water Supply and Demand Analysis, the City will have sufficient water supplies available through the year 2040 to meet all future water demands, including those of the Project. In the event of a water shortage, implementation of the City’s Water Shortage Contingency Plan and demand management measures would ensure that sufficient water supplies are available to serve its customers. The City also has additional water supplies available with implementation of the Kern River Conjunctive Use Optimization Project and an expansion of the recycled water system.

Stormwater in the Bakersfield metropolitan area is managed through a joint MS4 operated by the City of Bakersfield and Kern County under an NPDES permit issued by the Central Valley Regional Water Quality Control Board. The Project would incorporate site-specific drainage improvements consistent with the City’s Storm Water Management Plan and Municipal Code including low-impact development (LID) features and BMPs to control the volume and quality of runoff. Post-development peak flows would be managed on-site to avoid exceeding pre-Project conditions, and runoff would be directed to the existing municipal storm drain system via standard service connections. The Project would comply with all applicable NPDES permit requirements, including construction-phase erosion and sediment control measures and post-construction stormwater quality standards.

As discussed in greater detail in DEIR Section 4.6, Energy, operation of the Project would create additional demands for electricity and natural gas compared to existing conditions. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. The Project would have a total electricity demand of 5,968,579 kilowatt hours per year (kWh/yr).

While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop PV systems and battery storage systems. These systems would contribute an estimated 1,201,933 kWh/yr of onsite renewable electricity to offset a portion of the Project electricity demand from the grid. The on-site PV systems and battery storage—in addition to compliance with the RPS requirements by PG&E to increase electricity from renewable sources in the coming years—would further increase renewable electricity use.

As discussed in greater detail in Section 4.6, Energy, the Project would generate demand for natural gas due to the heating and cooling for the building and for water. The proposed land uses would generate a natural gas demand of 6,150,142 kilo British thermal units per year (kBTU/yr) under full buildout conditions. The Project would result in a net increase in natural gas demands.

However, the Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing energy efficiency of the proposed buildings.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-10
Telecommunications services in the Project area are provided by multiple carriers include Spectrum, AT&T, Verizon, and T-Mobile. Service to the Project, if selected by the operator, would be extended via standard connections from these existing facilities, with any necessary installation limited to on-site conduit, wiring, and equipment pads. No new or expanded off-site telecommunications facilities such as cell towers, switching stations, or major fiber trunk lines would be required.

Overall, because the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects, impacts related to utilities and service systems would be less than significant. No mitigation measures are required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-2: Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Impact Analysis
During Project construction water would be required for dust control and equipment cleaning.

However, it is anticipated that water would be imported and connections to the City’s water infrastructure would not be necessary. In addition, the contractor would install portable restrooms and hand-washing stations which are also anticipated to utilize imported water.

The City of Bakersfield’s water flow rate for commercial and industrial development is used to estimate the proposed project’s water demand. As indicated in Chapter 3 of the City’s Standards and Specifications for Domestic Water Systems, flow requirements for commercial and industrial developments should be calculated by assuming 5 single-family residences per acre. For the Project Site, this amounts to 230 single family units. The City’s Standards and Specifications for Domestic Water Systems indicate that the average daily demand is 185 gallons per capita per day, and flow requirements should be calculated assuming 3.5 persons per dwelling unit.

Therefore, as shown in Table 4.18-1, Project Water Demand, the Project’s total average water demand is 148,925 gallons per day or 166.8 afy.5
5 It should be noted that the project’s Sewer Area Study calculates an average wastewater generation rate for the proposed project of 0.26 cubic feet per second (cfs). This equates to 168,042 gpd. This is slightly larger than the average water demand shown in Table 2 since the sewer study’s intent is to size sewer pipes. Sewer generation rates related to the design of sewer pipes are typically conservative to account for fluctuations in sewer generation to sidestep the risk of exceeding sewer pipe capacities. The City’s commercial average daily sewage discharge is more conservative than the average daily demand for commercial water use.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-11
Table 4.18-1 – Project Water Demand
Use Type
Size
(acres)
Single Family Residence
Equivalent
(dwelling units/acre)
Average Daily
Demand (gallons
per capita per day)
Unit Occupancy
(persons per
dwelling unit)
Water
Demand
(gallons per
day)1
Commercial 46 5 185 3.5 148,925
Source: City of Bakersfield Standards and Specification for Domestic Water Systems, 2022. 1 Total water demand = 46 acres x 5 single family units per acre x 3.5 persons per dwelling unit x 185 gallons per capita per day = 148.925 gallons per day.

City of Bakersfield Water Demands
The source of water for the Project would be existing water supplies provided by the City to its customers. Based on the City’s 2020 UWMP, the current and projected water demands for normal years by customer class for the Domestic Water System are presented in Table 4.18-2. As shown in the table, the City’s Domestic Water System total water demand in 2020 was 45,649 acre feet (AF) for potable and raw water and 664 AF for recycled water. The projected 2040 water demand for potable water is 65,589 AF and the projected recycled water demand is 8,961 AF.

Table 4.18-2 – Current and Projected Potable Water Demands for the Domestic Water System (afy)
Use Type 2020 2025 2030 2035 2040
Single Family 29,986 33,627 36,764 40,194 43,944
Multi-Family 1,534 1,506 1,646 1,800 1,968
Commercial 6,904 8,030 8,780 9,598 10,494
Industrial 314 502 549 600 656
Institutional/Governmental 3,527 4,015 4,390 4,799 5,247 Other 250 502 549 600 656
Water Loss 3,314 2,008 2,195 2400 2,624
Potable and Raw Water
Subtotal
45,649 50,190 54,873 59,991 65,589
Recycled Water Subtotal 664 2,240 8,961 8,961 8,961
Total 46,313 52,340 63,834 68,952 74,550
Source: City of Bakersfield 2020 UWMP, 2021.

Table 4.18-3, shows the water demand projections for the City’s Wholesale Water System. The Wholesale Water System’s 2020 demand was 77,528 AF and the projected 2040 demand is 100,000 AF.

Table 4.18-3 – Current and Projected Potable Water Demands for the Wholesale Water System (afy)
Demand Type 2020 2025 2030 2035 2040
Potable and Raw
Water 77,528 100,000 100,000 100,000 100,000
Source: City of Bakersfield 2020 UWMP, 2021.

The City operates both a Domestic Water System and a Wholesale Water System. The water supply sources for the Domestic Water System are groundwater and recharged surface water supplies pumped from City owned wells and treated surface water from two water treatment plants Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-12
The Domestic Water System is the focus of this analysis since this is the water available for municipal supply within the project area.

The amount of water that was supplied in 2020 to the City’s Domestic Water System service area is summarized in Table 4.18-4. As shown in the table, approximately 74 percent of the City’s water supply is groundwater, 25 percent is surface water, and one percent is recycled water.

Table 4.18-4 – Actual Water Supplies for the Domestic Water System (afy) Water Supply Source
Additional Detail on Water
Supply
2020
Actual Volume Water Quality
Groundwater City Wells 34,107 Drinking Water
Surface Water (Kern River) Cal Water Northwest
Treatment Plant
2,872 Drinking Water
Surface Water (SWP supplemented by
Kern River)
Henry C. Garnett Water
Purification Plant
8,760 Drinking Water
Recycled Water WWTP No. 3 Tertiary 664 Recycled Water
Total 46,313 -
Source: Bakersfield, 2021. 2020 UWMP
Every urban water supplier is required to assess the reliability to provide water service to its customers under normal, dry, and multiple dry water years. As shown in Table 4.18-5, the City’s Domestic Water System will be able to meet demands with projected supplies under normal and drought conditions from 2025 to 2040. Table 4.18-5 shows that the water demand would increase from 52,430 afy in 2025 to 63,834 afy in 2030 under normal conditions and would increase from 42,662 afy to 46,642 afy for the fifth consecutive drought year. The water use projections have not been adjusted to account for future water savings from codes, standards, ordinances, or transportation and land use plans and are therefore very conservative.

The City can increase use of their groundwater wells during years of reduced Kern River supplies.

The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would reduce in reductions in water demands by 10 to 15 percent during drought conditions.

Table 4.18-5 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy)
2025 2030 2035 2040
Normal Year
Supply Totals 52,430 63,834 68,952 74,550
Demand Totals 52,430 63,834 68,952 74,550
Difference 0 0 0 0
Single Dry Year
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Multiple Dry Year
Year 1
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Year 2
Supply Totals I I I I 45,171 49,386 53,992 59,030
Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-13
Table 4.18-5 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy)
2025 2030 2035 2040
Demand Totals 45,171 49,386 53,992 59,030
Difference 0 0 0 0
Year 3
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 4
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 5
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Source: Bakersfield, 2021. 2020 UWMP
The water demand for the Project is estimated to be 166.8 afy. This demand amounts to less than one percent of the City’s total water demand for normal year conditions for the year 2030. Project buildout is anticipated to occur in 2027.

The UWMP projects an increase in water demand of 9,224 afy from 2020 to 2030. More specifically, the water demand for the commercial land use sector would increase 1,876 afy from 2020 to 2030. The estimated Project water demand of 166.8 afy is only 8.9 percent of the increase in demand for the commercial land use sector and thus is accounted for in the UWMP as part of the future development in the City.

In addition, the City’s Water Shortage Contingency Plan would be implemented during drought conditions to further reduce water demand. Also, the water use projections do not account for future reductions in water demand with the implementation of water conservation programs, rebates for low-flow toilet and washer replacements, and the requirement to replace inefficient plumbing fixtures with the sale of residential and commercial properties. Also, this analysis did not consider the increased use of recycled water by the year 2030 that could be available to the proposed project or other future development within the City, which would further reduce the potable water demand.

Furthermore, the Kern River Conjunctive Use Optimization project would be implemented over time and involves the full use of the Citty’ available Kern River entitlement. Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

Therefore, the Domestic Water System can accommodate the Project’s demand of 166.8 afy. A Water Shortage Contingency Plan (WSCP) was adopted as a part of the City’s 2020 UWMP to provide measures, referred to as response actions, to be implemented in the event of water shortages. In accordance with Water Code requirements, there are six standard water shortage levels and response actions defined in the City’s WSCP that increase restrictions on water use in response to increasing levels of water shortage conditions ranging from 10 percent to greater than 50 percent. The response actions and other considerations in the City’s WSCP are reviewed Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-14
on a periodic basis to determine the effectiveness of the implementation of the various measures to achieve the desired water demand reductions.

Demand Management Measures
The City implements demand management measures (DMMs) designed to reduce water demands in the face of future droughts, improve water service reliability, and help meet state and regional water conservation goals. The City DMMs include the following:
• Water waste prevention ordinances for the Domestic Water System • Metering
• Conservation pricing for the Domestic Water System
• Public education and outreach
• Programs to assess and manage distribution system losses • Water conservation program coordination and staffing support • Using recycled water for irrigation of the Bakersfield Sports Village • Installing “smart” irrigation controllers in all City parks • Closing City spray parks during drought conditions
• Reducing the time and frequency of irrigation for City parks and landscape areas during drought conditions
• Installing artificial turf at various City facilities and within street medians throughout the City
• Prohibiting natural lawn within newly constructed City medians • Reducing the frequency that City vehicles are washed. • Replaced bathroom fixtures with water efficient fixtures at the Mechanics Bank Arena, Theater, and Convention Center, and the San Joaquin Community Ice Center of Bakersfield
• Reducing the frequency and duration of fire apparatus testing operations • Updating landscape standards to reflect the current State Model Water Efficient Landscape Ordinance
• Adopting, by reference, the California Green Code sections relating to installation of low water use plumbing fixtures in new construction
• Asset management for the Wholesale Water System
• Wholesale supplier assistance program
Therefore, the City will have sufficient water supplies available through the year 2040 to meet all future water demands, including those of the Project. In the event of a water shortage, implementation of the City’s Water Shortage Contingency Plan and demand management measures would ensure that sufficient water supplies are available to serve its customers. The Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-15
City also has additional water supplies available with implementation of the Kern River Conjunctive Use Optimization Project and an expansion of the recycled water system.

Therefore, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-3: Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that is has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Impact Analysis
Wastewater generated by the Project would be collected and conveyed via the City of Bakersfield’s municipal sewer system, operated by the City’s Wastewater Division. The Project would be served by Wastewater Treatment Plant No. 3 which has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd.

As noted in the Sewer Area Study prepared for the Project, the average daily wastewater generated by the Project would be 0.2588 cubic feet per second (cfs) or 167,240 gallons per day.

The Project’s wastewater generation would be well within the available capacity of the Wastewater Treatment Plant No. 3.

Therefore, the Wastewater Treatment Plant No. 3. would have adequate capacity to treat the wastewater produced by Project operations. Furthermore, the Project would not require or result in the relocation or construction of new or expanded treatment facilities. Impacts related to wastewater generation would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-4: Would the project generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals? Threshold UTI-5: Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Impact Analysis
The Project site is currently vacant and therefore, no solid waste is currently being generated at the site. Once development occurs on the Project Site, an increase in waste stream to landfills would occur. The City of Bakersfield Public Works Department Solid Waste Division would provide solid waste disposal services to the Project Site.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-16
Construction associated with the Project would result in solid waste associated primarily with grading activities. There would be limited construction demolition debris. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals. The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. As such, the Project would not generate solid waste in excess of State or local standards or otherwise impair the attainment of solid waste reduction goals, and impacts would be less than significant.

The Project would be served by the Metropolitan Sanitary Landfill, operated by the Kern County Public Works Department. This Class III municipal solid waste facility has a permitted maximum throughput of 4,500 tons per day and an estimated remaining capacity of approximately 22 million tons, equating to approximately 21 years of operation at current disposal rates.6 Regarding the Project’s operation, using CalRecycle’s solid waste generation factor for commercial uses of approximately 13 pounds per 1,000 square foot per day, the Project’s 405,531 square feet of building area would generate approximately 5,272 pounds/day (2.6 tons/day), or 949 tons per year of solid waste. Consistent with state mandates (AB 939, AB 341, AB 1826, and SB 1383) and City programs, at least 50 percent of this material would be diverted through recycling and organics collection, resulting in an estimated disposal volume of 474 tons per year (1.3 tons/day).

This generation represents approximately 0.03 percent of the landfill’s permitted daily throughput and an even smaller fraction of its remaining capacity. Given the minimal contribution of both operational and construction solid waste relative to available landfill capacity, the fact that the waste stream is accounted for in the County Integrated Waste Management Plan, and the Project’s compliance with all applicable waste reduction and diversion requirements, the Project would not generate solid waste in excess of state or local standards, exceed the capacity of local infrastructure, or impair the attainment of solid waste reduction goals. Therefore, impacts would be less than significant, and no further analysis is warranted.

Solid waste collection and disposal for the Project would be provided by the Bakersfield Department of Public Works (BDPW), which offers garbage, recycling, and organics collection services to residents and businesses. Solid waste from the Project would be transported to the Metropolitan Landfill, which operates under permits issued by CalRecycle. The Project would be required to comply with all applicable federal, state, and local solid waste management and reduction statutes and regulations, including the federal Resource Conservation and Recovery Act (RCRA), California Integrated Waste Management Act of 1989 (AB 939), Mandatory Commercial Recycling (AB 341), Mandatory Commercial Organics Recycling (AB 1826), and Short-Lived Climate Pollutants: Organic Waste Reductions (SB 1383), as well as the City of Bakersfield’s solid waste and recycling ordinances.

Compliance would be achieved through participation in the City’s collection and recycling programs, proper segregation of recyclables and organics, and adherence to landfill disposal requirements. Because the Project would be served by an established municipal solid waste collection system and would comply with all applicable statutes and regulations, it would not conflict with or obstruct implementation of solid waste management and reduction laws. 6 CalRecycle. https://www2.calrecycle.ca.gov/SolidWaste/Site/Summary/742 Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-17
The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Implementation of the Project could potentially result in cumulative impacts associated with utilities and service systems when combined with other past, present, and reasonably foreseeable future projects in the broader project area.

All projects in the area would be subject to state and local water quality regulations, whose robustness is sufficient to ensure that the combined water quality solid waste and wastewater effects of each project would not be cumulatively considerable. With respect to construction operations, all cumulative projects would comply with the State’s NPDES Construction General Permit, requiring implementation of a stormwater pollution prevention plan during construction activities. Similar to the Project, each of the cumulative projects would be evaluated for demand on utilities and service systems. The cumulative projects would be required to comply with the applicable regulatory requirements and applicable mitigation to reduce potential impacts to these resources. Accordingly, cumulative impacts to utilities and service systems are less than significant.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
Not applicable. Project-specific and cumulative impacts related to utilities and service systems would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-18
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.19-1

4.19 Wildfire
This section discusses potential environmental impacts associated with wildfire hazards that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project).

Potential effects are evaluated based on whether the Project is in or near a State Responsibility Area (SRA) or lands classified as Very High Fire Hazard Severity Zones (VFHSZs) and, if so, whether the Project would substantially impair an adopted emergency response plan or emergency evacuation plan; exacerbate wildfire risks, and thereby expose Project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of wildfire; require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment; or expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

The analysis is based on a review of relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts related to wildfire hazards and identified measures to reduce or avoid significant impacts if applicable. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance); and the California Department of Forestry and Fire Protection (CAL FIRE) Fire Hazard Severity Zone web viewer.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding wildfire.

4.19.1 Regulatory Setting
Federal
Disaster Mitigation Act of 2000
The Disaster Mitigation Act (42 United States Code [U.S.C.] Section 5121) was signed into law to amend the Robert T. Stafford Disaster Relief Act of 1988 (42 U.S.C. Sections 5121-5207). Among other things, this legislation reinforces the importance of pre-disaster infrastructure mitigation planning to reduce disaster losses nationwide and is aimed primarily at the control and streamlining of the administration of federal disaster relief and programs to promote mitigation activities. Some of the major provisions of this Act include:
i. Funding pre-disaster mitigation activities;
ii. Developing experimental multi-hazard maps to better understand risk; iii. Establishing state and local government infrastructure mitigation planning requirements; iv. Defining how states can assume more responsibility in managing the hazard mitigation grant program; and
v. Adjusting ways in which management costs for projects are funded.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-2
State
California Department of Forestry and Fire Protection
CAL FIRE protects the people of California from fires, responds to emergencies, and protects and enhances forest, range, and watershed values providing social, economic, and environmental benefits to rural and urban citizens. Another major responsibility of CAL FIRE is to use its firefighters, fire engines, and aircraft to respond to wildland fires.

The Office of the State Fire Marshal supports CAL FIRE’s mission by focusing on fire prevention.

It provides support through a wide variety of fire safety responsibilities including by regulating buildings in which people live, congregate, or are confined; by controlling substances and products which may, in and of themselves, or by their misuse, cause injuries, death, and destruction by fire; providing statewide direction for fire prevention in wildland areas; regulating hazardous liquid pipelines; reviewing regulations and building standards; and providing training and education in fire protection methods and responsibilities.

State Fire Regulations
Fire regulations for California are established in Section 13000 et seq. of the California Health and Safety Code (HSC) and include regulations for structural standards (similar to those identified in the CBC; fire protection and public notification systems; fire protection devices such as extinguishers and smoke alarms; standards for high-rise structures and childcare facilities; and fire suppression training. The State Fire Marshal is responsible for enforcement of these established regulations and building standards for all state-owned buildings, state-occupied buildings, and state institutions within California.

California Public Resources Code Sections 4290 and 4291 California Public Resources Code (PRC) Sections 4290 and 4291, which implement minimum fire safety standards related to defensible space, apply to the perimeters and access to all commercial, industrial, and residential building construction within an SRA, and within lands classified and designated as VHFHSZ. The person(s) who control, lease, maintain, operate, or own such a building in, upon, or adjoining a mountainous area, forest-covered lands, brush-covered lands, grass-covered lands, or land that is covered with flammable materials is required to preserve a minimum defensible space of 100 feet from the perimeter of the building. The regulations include the following:
• Road standards for fire equipment access.
• Standards for signs identifying streets, roads, and buildings. • Minimum private water supply reserves for emergency fire use. • Fuel breaks and greenbelts.

These regulations do not supersede local regulations which equal or exceed minimum regulations adopted by the state.

California Government Code Section 66474.02
This regulation states that before a legislative body can approve a tentative map (or a parcel map for which a tentative map was not required) for an area or development located in an SRA or a VHFHSZ, the following findings must be made:

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-3

1. A finding supported by substantial evidence in the record that the subdivision is consistent with Sections 4290 and 4291 of the PRC, requiring 100 feet of defensible space around the structure.

2. A finding supported by substantial evidence in the record that the subdivision is consistent with local ordinances certified by the State Board of Forestry and Fire Protection as meeting or exceeding the state regulations.

3. A finding supported by substantial evidence in the record that structural fire protection and suppression services will be available for the subdivision through any of the following entities:
a. A county, city, special district, political subdivision of the state, or another entity organized solely to provide fire protection services that is monitored and funded by a county or other public entity.
b. CAL FIRE by contract entered into pursuant to Sections 4133, 4142, or 4144 of the PRC.

Upon approving a tentative map, or a parcel map for which a tentative map was not required, for an area (development) located in an SRA or VHFHSZ, a legislative body shall transmit a copy of the findings and accompanying maps to the State Board of Forestry and Fire Protection. 2025 California Fire Code
2025 California Fire Code, CCR Title 24, Part 9 (2025 California Fire Code) is a set of regulations addressing fire safety and fire prevention in buildings and structures throughout the State.1It contains regulations relating to construction and maintenance of buildings, the use of premises, and the management of Wildland-Urban Interfaces (WUI) areas, among other issues. The California Fire Code is updated every three years by the California Building Standards Commission and was last updated in 2025 and effective January 1, 2026. The California Fire Code 2025 is based on the International Fire Code 2024 (IFC 2024) with amendments and additions.

The Fire Code sets forth regulations regarding building standards, fire protection and notification systems, fire protection devices such as fire extinguishers and smoke alarms, high-rise building standards, and fire suppression training. It contains regulations relating to construction, maintenance, and use of buildings. Topics addressed in the code also include fire department access, fire hydrants, automatic sprinkler systems, fire alarm systems, fire and explosion hazards safety, hazardous materials storage and use, provisions intended to protect and assist fire responders, industrial processes, and many other general and specialized fire-safety requirements for new and existing buildings and the surrounding premises. Development under the Project would be subject to applicable regulations of the California Fire Code.

Title 8 California Code of Regulations Sections 1270 and 6773 In accordance with CCR, Title 8, Section 1270, “Fire Prevention,” and Section 6773, “Fire Protection and Fire Equipment,” the California Occupational Safety and Health Administration (Cal/OSHA) has established minimum standards for fire suppression and emergency medical services. The standards include, but are not limited to, guidelines on the handling of highly combustible materials, fire hose sizing requirements, restrictions on the use of compressed air, 1 California Fire Code. 2025. Available at: https://up.codes/viewer/california/ca-fire-code-2025. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-4
access roads, and the testing, maintenance, and use of all firefighting and emergency medical equipment.
2025 California Building Code
California building standards are published in the CCR, Title 24, also known as the California Building Code (CBC). The CBC, which applies to all applications for building permits, consists of 12 parts that contain administrative regulations for the California Building Standards Commission and for all state agencies that implement or enforce building standards. Local agencies must ensure the development complies with the regulations contained in the CBC.

California Governor’s Office of Emergency Management Agency In 2009, the State of California passed legislation creating the California Governor’s Office of Emergency Management Agency (Cal-EMA) and authorizing it to prepare a Standardized Emergency Management System (SEMS) program (19 CCR Section 2400 et seq.), which sets forth measures by which a jurisdiction should manage emergency disasters. Non-compliance with SEMS could result in the state withholding disaster relief from the non-complying jurisdiction in the event of an emergency disaster. Cal-EMA, Fire and Rescue Division is responsible for the development, implementation and coordination of the California Fire Service and Rescue Emergency Mutual Aid Plan (the Plan). The Plan is developed and updated under guidance and approval of the Fire and Rescue Service Advisory Committee/FIRESCOPE Board of Directors.

The continued success of California’s unique and highly-effective Fire and Rescue Mutual Aid System demands a maximum level of understanding and cooperation by all who use and support it.

California Mutual Aid System
The Plan is an extension of, and supportive document to, the California Emergency Plan. The Plan was first prepared and adopted in 1950 as Annex 3-C of the California State Civil Defense and Disaster Relief Plan.2 The purpose of the Plan is:
• To provide for systematic mobilization, organization, and operation of necessary fire and rescue resources of the state and its political subdivisions in mitigating the effects of disasters, whether natural or man-caused.
• To provide comprehensive and compatible plans for the expedient mobilization and response of available fire and rescue resources on a local, area, regional, and statewide basis.
• To establish guidelines for recruiting and training auxiliary personnel to augment regularly organized fire and rescue personnel during disaster operations. • To provide an annually updated fire and rescue inventory of all personnel, apparatus, and equipment in California.
• To provide a plan and communication facilities for the interchange and dissemination of fire and rescue-related data, directives, and information between fire and rescue officials of local, state, and federal agencies.
2 California Governor’s Office of Emergency Services. 2026. Fire Operations webpage. Available at:
https://www.caloes.ca.gov/office-of-the-director/operations/response-operations/fire-rescue/fire-operations/. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-5
• To promote annual training and/or exercises between plan participants.

Senate Bill 1241: Fire Hazard Impacts
Senate Bill (SB) 1241 was passed in September 2013, which required the Governor’s Office of Planning and Research (now called the Office of Land Use and Climate Innovation [LCI]), the Natural Resource Agency, and CAL FIRE to develop “amendments to the initial study checklist of the [CEQA Guidelines] for the inclusion of questions related to fire hazard impacts for projects located on lands classified as SRAs, as defined in Section 4102, and on lands classified as VHFHSZ, as defined in Subdivision (i) of Section 51177 of the Government Code.” (PRC Section 21083.01). With California's increasing population and the expansion of development into previously undeveloped areas, there are more "wildland‐urban interface" issues with a corresponding increased risk of loss to human life, natural resources, and economic assets associated with wildland fires. Additionally, the changing climate, specifically rising temperatures and increasing temporal variability of water availability has substantially increased wildfire risk in many areas around the State.

California Code of Regulations Sections 51175 through 51189 This portion of the CCR establishes the Moderate, High, and Very High Fire Severity Zones within the State. This regulation allows emergency response and hazard management departments to effectively locate areas which are more susceptible to fire hazards. This law also provides the framework for further preventive measures to decrease wildfire hazards.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies, and implementation programs in order to protect the City’s residents and visitors from wildfire hazards.

Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.

SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-6
Implementation Measures
1 The adopted multi-jurisdictional Kern County, California Multi-Hazard Mitigation Plan, as approved by FEMA, shall be used as a source document for preparation of environmental documents pursuant to CEQA, evaluation of project proposals, formulation of potential mitigation and identification of specific actions that could, if implemented, mitigate impacts from future disasters and other threats to public safety.

Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by the Federal Emergency Management Agency (FEMA) on April 9, 2021. The Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County and participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.3 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.

Kern County Emergency Operations Plan
The Kern County Emergency Operations Plan (EOP) is an all-hazards document that provides for the integration and coordination of planning efforts of the County with those of its cities, special districts, and the state region. It provides a framework for the County to use in performing emergency functions before, during, and after an emergency event, natural disaster, or technological incident. As the lead agency for the Operational Area (OA), the County will lead the coordination among the cities and special district within the jurisdiction. This EOP provides for the County’s compliance with the SEMS, the National Incident Management System (NIMS), the Incident Command System (ICS), the National Response Framework (NRF), and the National Preparedness Guidelines to include Comprehensive Preparedness Guide 101, version 2.0:

Developing and Maintaining Emergency Operations Plans (CPG-101). It facilitates multi-agency and multijurisdictional coordination during emergency operations, public information functions, and resource management. This EOP serves as the legal and conceptual framework for incident management to be utilized by the County and its various departments. 4 City of Bakersfield Municipal Code
The City of Bakersfield Municipal Code adopts the 2025 CBC in Section 15.05.010. The City’s Building Division is responsible for promoting health and safety in the construction and maintenance of buildings and structures, and the maintenance of property through the enforcement of uniform building construction codes, conservation standards, regulations, and ordinances, including the CBC and the City’s adopted policies, ordinances, and standards. 3 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026. 4 Kern County Office of Emergency Services. 2022. County of Kern Emergency Operations Plan. Available at:
https://www.kerncounty.com/home/showpublisheddocument/8407/637859766134270000. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-7

4.19.2 Environmental Setting
According to the National Park Service, wildland fire is described as an overarching term describing any non-structure fire that occurs in vegetation and natural fuels. A wildfire is an unplanned fire caused by lightning or other natural causes, by accidental (or arson-caused) human ignitions, or by an escaped prescribed fire.
5 PRC Sections 4201-4204 direct CAL FIRE to map fire hazards within a SRA based on fuel loading, slope, fire weather, and other relevant factors present, including areas where winds have been identified by the department as a major cause of wildfire spread. These zones, referred to as Fire Hazard Severity Zones (FHSZ), classify a wildland zone as Moderate, High, or Very High fire hazard based on the average hazard across the area included in the zone. As part of this mapping system, land where CAL FIRE is responsible for wildland fire protection and generally located in unincorporated areas is classified as SRAs. Where local fire protection agencies, such as the BFD, are responsible for wildfire protection, the land is classified as a Local Responsibility Area (LRA). As further discussed in Section 4.15, Public Services and Recreation, of this Draft EIR, BFD has a joint powers agreement (JPA) with Kern County Fire Department (KCFD) in which the agency with the closest fire station will respond to the call for service regardless of the jurisdiction.6 The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. KCFD Station 66, Landco Station, is also in close proximity to the Project Site, located at 3000 Landco Drive, approximately 1.93 miles east of the Project Site.7 As such, calls for service from the Project site would be addressed by KCFD.

According to CAL FIRE’s FHSZ viewer, the entire Project Site and surrounding area is designated as a LRA. The Project Site is identified as having no FHSZ and it is not within or near to a VHFHSZ. The closest FHSZ, both moderate and high, is located in an LRA and is approximately

4.29 miles northeast of the Project Site, as the uplands around the Kern River transition to Sequioa National Forest. The nearest VHFHSZ in an SRA is located 16.17 miles east of the Project Site.

4.19.3 Impact Analysis
Methodology
Evaluation of potential impacts associated with wildfire was based on a review of CAL FIRE maps to determine the location of the Project relative to FHSZ.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Substantially impair an adopted emergency response plan or emergency evacuation plan. 5 National Park Service. 2026. Wildfires, Prescribed Fires, and Fuels webpage. Available at:
https://www.nps.gov/orgs/1965/wildfires-prescribed-fires-fuels.htm. Accessed March 2026. 6 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 7 City of Bakersfield. 2026. Departments, Fire. Locate Fire Stations GIS portal. Available at: Accessed February 2026. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-8
• Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire.
• Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment. • Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

Project Impacts
Threshold WF-1: Would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
Impact Analysis
According to the CAL FIRE, the Project Site is not within or in proximity to a VHFHSZ, nor is it within a SRA. The Project Site is located within an LRA and currently receives fire protection services through a JPA with BFD and KCFD. Calls for service from the Project Site would be addressed by KCFD. According to the Kern MJHMP, the Project Site is not identified as being located where there is historic fire occurrence where wildfires have occurred or returned at any interval. The Kern MJHMP also classifies the Project Site as having no wildfire vulnerability, and as such, it also does not have an exposure risk.9
No aspect of the Project would prevent the implementation of the Kern MJHMP and EOP.

Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, there would be no impact.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-2: Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Impact Analysis
The Project Site is not located in or near an SRA, and the Project Site does not contain lands classified as VHFHSZs. According to the Kern MJHMP, the Project Site is not identified as being located where there is historic fire occurrence where wildfires have occurred or returned at any 9 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Plan. Participating Jurisdiction Annex: City of Bakersfield. Available at: https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Municipalities/MUNICIPALITY_Bakersfield.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-9
interval. The Kern MJHMP also classifies the Project Site as having no wildfire vulnerability, and as such, it also does not have an exposure risk.10 Additionally, the Project would be required to comply with the CBC and California Fire Code. As such, the Project would not exacerbate wildfire risks or expose Project occupants to pollutant concentrations or the uncontrolled spread of a wildfire. Therefore, no impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-3: Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
Impact Analysis
The Project site is not located in or near an SRA and does not contain lands classified as VHFHSZs. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the BFD and KCFD.

Because the Project is required to comply with all applicable City codes, including the CBC and California Fire Code which has been incorporated into the City’s Municipal Codes, and is not located in a VHFHSZ, construction and operation of the Project would not increase the risk of fire, nor would it require the installation/maintenance of infrastructure that would exacerbate fire risk.

Therefore, no impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-4: Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Impact Analysis
The Project site is not located in or near an SRA and does not contain lands classified as VHFHSZs. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide. It also is not located downstream of any bodies of water that would result in flooding to the Project Site. As such, the Project would not expose people or structures to significant risks as a result of runoff, post-fire slope instability, or drainage changes. Potential impacts regarding flooding, landslides, and drainage are further discussed in 10 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Plan. Participating Jurisdiction Annex: City of Bakersfield. Available at: https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Municipalities/MUNICIPALITY_Bakersfield.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-10
Section 4.7, Geology and Soils, and Section 4.10, Hydrology and Water Quality. Therefore, there would be no impact.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project in combination with the identified cumulative projects would result in significant effects to wildfire. For purposes of this analysis, the geographic scope would be the City.

Under the Kern MJHMP, the majority of the City does not have a history of fire occurrence and as such, wildfires have not returned at any interval. The Kern MJHMP also classifies the majority of the City as having no wildfire vulnerability, and as such, it also does not have an exposure risk.

The nearest FHSZ is located 4.29 miles to the northeast and the closest VHFHSZ is over 16 miles east. Therefore, neither the Project nor the cumulative projects, which are within a 1.5 miles radius, are located within areas susceptible to wildfire, including FHSZ. Subsequently, there would be no impacts, including cumulative impacts, associated with wildfire.

Mitigation Measures
None required.

Level of Significance After Mitigation
There would be no cumulative impacts associated with wildfire with no mitigation required.

City of Bakersfield – SCH No. 2025101507 5-1

5. Alternatives

5.1 Introduction
CEQA Guidelines Section 15126.6(a), requires that an EIR “describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives.” This chapter presents the alternatives analysis required by CEQA for the proposed Project, summarizes the proposed Project, identifies the Project objectives, describes the alternatives to be analyzed, and discusses the alternatives considered but eliminated from further analysis. The impacts associated with each alternative are then described by environmental topic discussed in Chapter 4, Environmental Impact Analysis, and compared with those of the proposed Project. Based on this alternatives analysis, and as required by CEQA, this chapter concludes by identifying the environmentally superior alternative.

5.2 Project Summary
As described in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-feet-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

The Project involves construction and operation of the Riverview Marketplace, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.

The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas, in front of storefronts and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screening with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area.

Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-2
circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas.

5.3 Project Objectives
Chapter 2, Project Description, describes the purpose of the Project and the Project’s underlying objectives.

The objectives of the Project are:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• Creation of new and future employment opportunities.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

5.4 Project Impacts
Based on the environmental analysis completed for the proposed Project and discussed in Chapter 4, Environmental Impact Analysis, significant and unavoidable impacts have been identified for the following environmental resource factor:
• Section 4.8, Greenhouse Gas Emissions
• Section 4.16, Transportation
Significant impacts requiring mitigation to reduce the impact to less than significant have been identified for the following environmental resource factors:
• Section 4.3, Air Quality
• Section 4.4, Biological Resources
• Section 4.5, Cultural Resources
• Section 4.7, Geology and Soils
Less than significant impacts were identified in the following environmental resource factors:
• Section 4.1, Aesthetics
• Section 4.6, Energy
Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-3
• Section 4.9, Hazards
• Section 4.10, Hydrology and Water Quality
• Section 4.11, Land Use and Planning
• Section 4.13, Noise
• Section 4.14, Population and Housing
• Section 4.15, Public Services and Recreation
• Section 4.17, Tribal Cultural Resources
• Section 4.18, Utilities and Service Systems
No impacts were identified for the following environmental resource factors:
• Section 4.2, Agriculture and Forestry Resources
• Section 4.12, Mineral Resources
• Section 4.19, Wildfire

5.5 Summary of Project Alternatives
This section of the Draft EIR considers three alternatives to the Project. These alternatives include:
• Alternative 1: No Build/No Project
• Alternative 2: Reduced Project Alternative
• Alternative 3: Existing General Plan/Zoning Alternative Consistent with CEQA Guidelines Section 15126.6(c), Alternatives 2 through 3 represent a range of reasonable “build” alternatives that could feasibly accomplish the project objectives discussed in Section 5.3, Project Objectives, and could potentially lessen the environmental impacts of the proposed Project. Per CEQA Guidelines Section 15126.6(e), the alternatives analysis includes the required “No Build/No Project” alternative. The purpose of describing and analyzing the “No Build/No Project” alternative is to allow decisionmakers the ability to compare the impacts of approving the proposed Project with the impacts of not approving the proposed Project.

Each of the three alternatives is described in greater detail below. Each alternative is described and evaluated in sufficient detail to determine whether the overall environmental impacts would be less than, similar to, or greater than the corresponding impacts of the Project. Furthermore, each alternative is evaluated to determine whether the Project objectives could be substantially attained by the alternative. It should be noted that the alternatives analysis excludes those impact thresholds for which the Project results in no impact, as summarized in Table ES-1.

At the end of this section, the comparative impacts of the Project and the alternatives are summarized in Table 5-1: Comparison of the Impacts of the Project Alternatives, below.

Pursuant to CEQA Guidelines Section 15126.6(e)(2) an Environmentally Superior Alternative is identified.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-4

5.5.1 Alternative 1: No Build/No Project
Description of the Alternative
Pursuant to Section 15126.6(e)(3)(B) of the CEQA Guidelines, Alternative 1, the “No Project” Alternative, represents the circumstance under which the Project does not proceed. Under Alternative 1 it is assumed that the existing state of the Project Site would remain as is and no new development would be implemented. As discussed in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-feet tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. Portion of Coffee Road is improved with concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Aesthetics
Under the No Build/No Project Alternative, the proposed commercial retail center and associated uses such as markets, retail/restaurants, medical offices, health club, and associated parking and landscaping would not be developed. The Project Site would remain in its current condition as largely vacant and fenced with on-site features including abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Regarding scenic quality, aesthetic impacts would be greater, as the Project would not transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions.

The Project does not contain any special or unique scenic attributes, like rock outcroppings, native vegetation, or a substantial number of mature trees. The Project Site is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, similar to the Project, the No Build/No Project Alternative would not block a view corridor of a scenic resource.

Regarding light and glare, no new sources of nighttime lighting or daytime glare would be introduced and no change to ambient lighting conditions in the surrounding area would occur. No impact related to light or glare would result.

Therefore, the No Build/No Project Alternative would result in no aesthetic impacts with response to light and glare, which is less than the Project’s less than significant impacts. However, impacts to scenic quality would be greater as the No Build/No Project Alternative would not visually improve the Project Site from existing conditions.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-5
Under Alternative 1, the Project Site would remain in its current condition and no impacts to agricultural resources would occur. Similar to the Project, no impact would occur. Impacts would be same under the No Build/No Project Alternative than the Project.

Air Quality
Under the No Build/No Project Alternative, the commercial development would not be constructed. No construction activities would occur, and no operational land uses that generate air emissions would be established on the Project Site. Accordingly, no construction equipment exhaust, fugitive dust, or vehicle trip emissions would be generated.

With respect to consistency with applicable air quality plans, the No Build/No Project Alternative would not generate any emissions that could conflict with or hinder implementation of the SJVAPCD’s adopted air quality attainment plans. No impact would occur.

With respect to criteria pollutant emissions and SJVAPCD regional and localized significance thresholds no construction or operational emissions would be generated. No potential exceedance of SJVAPCD thresholds would occur. With respect to objectionable odors, no land uses associated with odor generation would be established. No impact would occur. Therefore, the No Build/No Project Alternative would result in no air quality impacts, which is less than the Project’s less than significant impacts with mitigation measures that include MM AQ-1 (require the Project applicant to enter into a VERA with the SJVAPCD,); MM AQ-2 (provide onsite reductions in VOC emissions associated with coatings and paints used for the building exterior surfaces and parking lot striping; and implementation of MM GHG-1 through MM GHG-3 (provide VOC reductions generated from building energy use, property management landscaping equipment, and project-related vehicle trips). Impacts would be less under the No Build/No Project Alternative than the Project.

Biological Resources
Under the No Build/No Project Alternative, the commercial improvements would not be constructed. No ground-disturbing activities, vegetation removal, or construction operations would occur on the Project Site. The Project Site would remain in its current condition. As discussed in Section 4.4, Biological Resources, no special-status species under CEQA or designated critical habitat were found on the Project Site.

The Project Site does not contain suitable habitat for the Western burrowing owl (BUOW) and it was not present on the Project Site during the field survey conducted for the DEIR. However, because BUOWs may become established on disturbed sites prior to construction, under the Project, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in MM BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.

Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity (for instance, mobilization of heavy equipment).

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-6
Therefore, biological resource impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s impacts, which range from no impact to less than significant with mitigation (MM BIO-1 through MM BIO-3). Impacts would be less than the Project.

Cultural Resources
As discussed in Section 4.5, Cultural Resources, of this Draft EIR, the Cultural Resources Assessment prepared for the Project indicated there is a low probability that intact surface or subsurface archaeological resources or human remains would be discovered during construction.

However, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.

Therefore, the Project would implement MM CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. The Project would also implement MM CUL-2, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of MM CUL-1 and MM CUL-2, cultural resource impacts under the Project would be less significant with mitigation incorporated.

Alternative 1 would involve no construction nor operations that would result in site disturbance that could impact archaeological resources. As such, Alternative 1 would avoid the Project’s less than significant impact (after mitigation) related to the potential of any impacts to cultural resources and human remains. Thus, impacts would be less under Alternative 1 than the Project.

Energy
As discussed in Section 4.6, Energy, Project construction would consume energy due to fuel use by construction equipment as well as on-road vehicles used by construction employees, vendors, and for hauling materials. Operation would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use.

Operational energy use would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems, use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting.

Overall, construction and operation of the Project would not result in the inefficient, wasteful, or unnecessary consumption of energy. The Project would not cause or result in the need for additional energy production or transmission facilities.

The No Build/No Project Alternative would involve no construction nor operations that would require new or increased energy use on the Project Site and would not generate an increase in demand for energy compared to existing conditions. As such, the No Build/No Project Alternative would avoid the Project’s less significant energy consumption impacts during construction and operation. Thus, impacts with regard to energy consumption would be less under Alternative 1 when compared to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-7
Geology and Soils
As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is located within central California, which is a seismically active region, and potential for seismic ground shaking exists at the Project Site. However, the Project Site is not located within an active fault zone.

Furthermore, the Project would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because the proposed Project would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking. Additionally, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to be less than significant.

According to the Geotechnical Investigation, the Project Site is not located within a zone identified as having a potential for liquefaction by the CGS, therefore soil liquefaction is not likely to occur at the Project Site. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site.

Alternative 1 would involve no construction nor operations that would increase risk of loss, injury, or death involving rupture of a known earthquake fault or unstable seismic conditions. As such, Alternative 1 would avoid the Project’s less than significant impacts during construction and operation. Thus, impacts would be less under Alternative 1 when compared to the Project As such, Alternative 1 would avoid the Project’s less than significant impacts related to seismic-related events. Thus, impacts related to seismic-related ground failure including liquefaction would be less under Alternative 1 when compared to the Project.

Alternative 1 would involve no construction nor operations and there would be no potential for substantial soil erosion or the loss of topsoil. As such, Alternative 1 would avoid the proposed Project’s less than significant impact. Thus, impacts related to soil erosion would be less under Alternative 1 when compared to the Project. Alternative 1 would involve no construction nor operations; therefore, there would be no potential to expose people or structures to on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse. As such, Alternative 1 would avoid the Project’s less significant impact. Thus, impacts related to lateral spreading, subsidence, liquefaction or collapse, and expansive soils would be less when compared to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement MM GEO-1, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, Project impacts would be less than significant.

Alternative 1 would involve no construction nor operations; therefore, there would be no potential to destroy a unique paleontological resource. Thus, impacts related to paleontological resources would be less under Alternative 1 when compared to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-8
Greenhouse Gas Emissions
Under the No Build/No Project Alternative, the Project would not be constructed. No construction activities would occur, and no operational land uses that generate GHG emissions would be established on the Project Site. With respect to GHG emissions generation, no construction equipment would operate on the Project Site, and no vehicle trips, energy consumption, water use, or solid waste generation associated with project operations would occur. No GHG emissions, either directly or indirectly, would be generated. No impact would occur.

Under the Project, implementation of MM GHG-1 through MM GHG-7 would contribute to minimizing project-related energy sector and mobile source GHG emissions to the extent feasible.

However, the Project would still result in a net increase in GHG emissions. Thus, the Project’s GHG emissions and contribution to global climate change impacts are significant and unavoidable and considered cumulatively considerable.

Alternative 1 would avoid the Project’s significant and unavoidable GHG impacts. Thus, impacts would be less under Alternative 1 when compared to the Project.

Hazards and Hazardous Materials
As discussed in Section 4.19, Hazards and Hazardous Materials, of this Draft EIR, Construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities. However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Project implementation would not serve to increase public or environmental exposure to hazardous materials. Therefore, impacts under the Project would be less than significant.

The Project would construct various commercial buildings including a gas station and car wash.

Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce any potential to release contaminants.

Therefore, impacts related to the routine transport, use, and disposal of hazardous materials would be less than significant. Project operations would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts would be less than significant. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, the Project would not interfere within an adopted emergency response plan or emergency evacuation plan.

Alternative 1 would involve no construction nor operations on the Project Site; therefore, it would not change the potential for the routine transport, use, or disposal of hazardous materials into the environment compared to existing conditions. The No Build/No Project Alternative would have no impact with regard to development creating hazardous materials or expose people or structures to a significant loss, injury, or death involving wildfires or interference with an emergency operations plan. Thus, impacts would be less under Alternative 1 than the Project.

Hydrology and Water Quality
As discussed in Section 4.10, Hydrology and Water Quality, of this Draft EIR construction of the Project would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site. The Project would be required to comply with Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-9
the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, the Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). The Project would be required to implement a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, the Project would not violate any water quality standards or waste discharge requirements. The Project would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

Alternative 1 would involve no construction nor operations activities on the Project Site.

Accordingly, Alternative 1 would have no impacts with regard to flooding or existing drainage pattern of the Project Site. No impact would occur regarding any water quality standards or waste discharge requirements or groundwater recharge. Thus, impacts would be less under Alternative 1.

Land Use and Planning
Under the No Build/No Project Alternative, the commercial development and improvements would not be constructed. The Project Site would remain vacant and retain its existing General Plan land use designation of P and zoning of M-2.

With respect to conflicts with land use plans, policies, or regulations adopted for the purpose of avoiding or mitigating environmental effects no development would occur, and no potential conflict with the General Plan, City Zoning Code, or any other applicable land use plan or policy would result. The Project Site would remain consistent with its existing designations by default. No impact would occur.

Therefore, land use and planning impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s less than significant impacts. However, it should be noted that while the No Build/No Project Alternative avoids the General Plan Amendment, it also foregoes the General Plan policies that speak to accommodate new commercial development, promote infill development, and providing new land uses that serve the City’s population and provide for new job growth.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. The Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, similar to the Project, the No Build/No Project Alternative would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. Impacts would be the same under the No Build/No Project Alternative.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-10
Noise
Under the No Build/No Project Alternative, the proposed commercial development and associated improvements would not be constructed. No ground disturbance, grading, demolition, or construction activities would occur on the Project Site. The Project Site would remain vacant, and no new stationary noise sources (loading and unloading activities, mechanical equipment, car wash, drive-thru, etc.) or project-generated vehicle trips would be introduced.

With respect to generation of a substantial temporary or permanent increase in ambient noise levels, under Alternative 1, no construction equipment would operate on the Project Site and no construction-phase noise would be generated.

Operationally, no new stationary noise sources would be introduced. The Project Site is currently vacant and generates no noise. Under the No Build/No Project Alternative, the existing ambient noise environment in the project vicinity, would not be altered. No temporary or permanent increase in ambient noise levels would occur. No impact would result. With respect to generation of excessive groundborne vibration, no ground-disturbing construction activities would occur and no vibratory equipment would be operated. No operational vibration sources associated with a commercial center would be introduced. No impact would result. Therefore, noise and vibration impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s less than significant impacts.

Population and Housing
As discussed in Section 4.14, Population and Housing, of this Draft EIR, it is anticipated that future employees of the Project would reside within the city and surrounding area, and commute to work.

Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Alternative 1 would involve no construction or operations activities that would induce substantial unplanned population growth. Accordingly, no impacts would occur. Thus, impacts related to inducement of unplanned population growth would be less under Alternative 1 than the Project’s less than significant impacts.

Public Services
Fire Protection
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for fire protection and emergency response during construction and operation would be less than significant.

As a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire and emergency services. Additionally, the Project would be constructed pursuant to CFC requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by KCFD. Further, the Project would be subject to applicable development impact fees relating to fire protection. This would allow the fire department to offset any increased demand that may result from the Project. Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-11
Alternative 1 would involve no construction or operations activities that would result in an increase demand for fire protection services. As such, Alternative 1 would avoid the Project’s less than significant impact related to fire protection services and no impacts would occur. Thus, impacts related to fire protection services would be less under Alternative 1 than the Project.

Police Services
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for police services during construction and operation would be less than significant.

As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand.

However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand.

Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant.

Alternative 1 would involve no construction or operations activities that would result in an increase demand for police services. Thus, impacts related to police protection services would be less under Alternative 1 than the Project.

Parks
The Project is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Therefore, impacts related to parks as a result of the Project would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase future employment within the City and immediately surrounding area; therefore, it would have no impact related to parks. As such, Alternative 1 would avoid the Project’s less than significant impact related to parks. Thus, impacts related to parks would be less under Alternative 1 than the Project.

Schools
The Project would not generate any new students nor increase demand for school services.

Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of the Project would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase the population; therefore, it would have no impact related to schools. Thus, impacts related to schools would be less under Alternative 1 than the Project’s less than significant impact.

Other
Other public facilities typically pertain to services such as public libraries. It is anticipated that future employees of the proposed Project would reside within the City and immediately Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-12
surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.

Alternative 1 would involve no construction or operations activities that would result in construction or unplanned population growth; therefore, no impacts would occur in regard to other services.

Thus, impacts related to other services would be less under Alternative 1 than the Project.

Recreation
The Project would involve the development of a commercial marketplace that includes a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area, which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area. As discussed under Threshold REC-1, the Project would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase population or employment within the City and surrounding area. As such, Alternative 1 would have no impact on neighborhood and regional parks and would avoid the Project’s less than significant impacts.

Thus, impacts related to neighborhood and regional parks would be less under Alternative 1 than the Project.

Transportation
The Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies as PDFs consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the project’s location and operational characteristics. However, the reduction in VMT from the PDFs would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant and unavoidable impact.

Under the No Build/No Project Alternative, the commercial development would not be constructed. No construction activities would occur, no new vehicle trips would be generated, and no permanent employees or residents would be added to the Project Site. Therefore, VMT transportation impacts under the No Build/No Project Alternative would not occur.

With respect to substantial increases in hazards due to geometric design features, no driveways or site access points would be constructed. No offsite improvements would be made, including modifications to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping).

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-13
The Project would also provide new sidewalks along its frontages, and a new bicycle lane along Rosedale Drive, which extends the existing facilities in the future. Impacts associated with this alternative would be less than the Project. However, under the No Build/No Project Alternative, pedestrian, bicycle improvements and offsite traffic improvements would not occur.

Tribal Cultural Resources
The Project does not contain any resources that are likely to have historic significance.

A search of the Sacred Lands File (SLF) was conducted through the Native American Heritage Commission (NAHC) to determine if any sacred lands or traditional cultural properties on file with the NAHC were within or near the Project site. The NAHC’s SLF record search was negative, indicating that there is no record of sacred lands on the Project site.

In compliance with AB 52/SB 18 the City provided formal notification to California Native American Tribal representatives identified by the NAHC. Native American groups may have knowledge about the area’s cultural resources and may have concerns about a development’s adverse effects on Tribal cultural resources (TCRs). AB 52/SB 18 allows tribes 30 days after receiving notification to request consultation. On March 26, 2026, the City contacted representatives of the following Tribes:
• Santa Rosa Rancheria
• Kitanemuk & Yowlumne Tejon Indians
• Kawaiisu Tribe
• Tubaltulabals of Kern Valley
• Tule River Indian Tribe
• Chumash Council of Bakersfield
• Tejon Indian Tribe
• Kern Valley Indian Council
• Chalon Indian Council of Bakersfield
The above listed Tribes did not respond to the request for consultation and have opted out of the AB 52 and SB 18 consultation process. Therefore, the City has completed tribal consultation as provided for by AB 52/SB 18. Outgoing correspondence to representatives is included in Appendix K, though no response has been received.

Although no TCRs were identified in the Project site, ground-disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2. MM CUL-1 would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation.

Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. MM CUL-2, would require a cessation of construction activity in the event of an inadvertent discovery of human remains until the County coroner can evaluate the discovery and Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-14
made the necessary findings. MM CUL-2 would also provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of MM CUL-1 and MM CUL-2, impacts to TCRs remains would be less than significant with mitigation incorporated.

Alternative 1 would involve no construction nor operations that would result in site disturbance that could impact TCRs. As such, Alternative 1 would avoid the Project’s less than significant impact (after mitigation) related to the potential of any impacts to TCRs. Thus, impacts would be less under Alternative 1 than the Project.

Utilities and Service Systems
The Project will not require the construction of new water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Therefore, impacts associated with both construction and operation of the Project would be less than significant.

Impacts on water demand and wastewater would also be less than significant.

Alternative 1 would involve no construction or operations activities that would involve any new development and thus would not include any construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Thus, impacts related utilities and service systems would be “less” under Alternative 1 than the Project’s less than significant impacts.

The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Alternative 1 would involve no construction or operations activities that would involve any development and thus would not generate solid waste in excess of state and local standards.

Accordingly, Alternative 1 would have no impact and would avoid the Project’s less than significant impact related to solid waste. Thus, impacts related to solid waste would be less under Alternative 1 than the Project.

Wildfire
The Project Site is not located in or near an SRA and does not contain lands classified as VHFHSZs. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide. It also is not located downstream of any bodies of water that would result in flooding to the Project Site. As such, the Project would not expose people or structures to significant risks as a result of runoff, post-fire slope instability, or drainage changes. No impact would occur.

As no development would occur under Alternative 1, impacts would be the same the impacts related to the Project.

Relationship of the Alternative to the Project Objectives As described above, Alternative 1 assumes that no new development would occur on the Project Site. As the No Build/No Project alternative would not include a development program, the Alternative 1 would not meet any of the objectives of the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-15

5.5.2 Alternative 2: Reduced Project Alternative
Description of the Alternative
Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses.

Accordingly, the total commercial square footage would be reduced from 405,531 square feet to approximately 304,148 square feet and the total number of dual sided fuel pumps would be reduced from 20 to 15. The buildings would be constructed in the same general arrangement as currently proposed and set forth in the site plan, but with a smaller footprint. The areas not covered by buildings would be used for surface parking for passenger vehicles and the site’s vehicular access would be the same general arrangement as currently proposed and set forth in the site plan. The development characteristics of this Reduced Project Alternative are assumed to be similar to those of the Project, including excavation and earth movement.

Environmental Impacts
Aesthetics
Alternative 2 would occur on the same Project Site as the Project. Regarding scenic quality/regulatory compliance, the Project Site is located in an urbanized area; accordingly, the applicable threshold focuses on consistency with applicable zoning and regulations governing scenic quality would be the same. While less development would occur, the site plan, type of architecture and landscaping would be similar under Alternative 2 to the Project, and would still improve the Project Site compared to existing conditions. Scenic quality impacts would be similar to the Project.

Similar to the Project, Alternative 2 is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, similar to the Project, Alternative 2 would not block a view corridor of a scenic resource.

Regarding light and glare, while less development would occur, Alternative 2 would still result in light and glare impacts, albeit less than the Project. Overall, Alternative 2 would result in the same aesthetic impacts as the Project.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Similar to the Project, no impact would occur. Impacts would be the same under Alternative 2 as the Project.

Air Quality
Regarding construction, although the types of land uses under Alternative 2 would remain unchanged compared to the Project, the amount of land uses developed would be generally reduced by 25 percent overall. The reduction in development intensity could result in less intense construction activities overall and in a given year. Because the Project Site area (overall site acreage) would remain the same under under Alternative 2, it is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-16
the Project. However, there would be a reduction in vertical building construction due to the reduction in overall land uses that would be developed.

Thus, it is anticipated that construction activities under Alternative 2 would result in either similar or reduced regional and localized air quality impacts identified for the Project. As discussed in the DEIR, the Project would not exceed the SJVAPCD regional significance thresholds and ambient air quality screening thresholds for construction. Additionally, the Project would also not exceed the SJVAPCD health risk significance thresholds for construction. Therefore, similar to the Project, Alternative 2 would also result in less than significant regional and localized construction-related air quality impacts, however impacts would be less than that of the Project.

For regional operation-phase impacts, because the types and mix of land uses under Alternative 2 would remain unchanged from the Project, this alternative would generate approximately 25 percent less operation emissions. Though annual VOC emissions would be reduced under this alternative, they would still exceed the SJVAPCD regional significance threshold. Therefore, Alternative 2, alternative would not eliminate any of the Mitigation Measures (MM AQ-1, MM AQ-2, MM GHG-1 through MM GHG-3) required by the Project.

Regarding potential operation-related localized air quality impacts, this alternative would result in similar or slightly reduced risk impacts associated with toxic air contaminants (TACs) because it would consist of the same commercial and retail land use types and mix compared to the Project with a 25 percent reduction in land use development. Overall, similar to the Project, Alternative 2 would result in less than significant operation-related health risk and CO hotspot impacts.

Alternative 2 would result in similar construction- and operation-related odor impacts compared to the Project because it would be composed of the same land use types and mix. Additionally, it would comprise the same site area and would require similar or slightly less intense construction activities. Alternative 2 would also result in less than significant odor impacts similar to the Project.

Overall, impacts would be less under Alternative 2 than the Project, however the impacts would continue to be significant and all of the mitigation measures would remain applicable.

Biological Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM BIO-1 through MM BIO-3 would remain applicable under Alternative 2. Impacts would be the same as the Project.

Cultural Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 2. Impacts would be the same as the Project.

Energy
Alternative 2 would be developed in the same area as the Project with the same land use types and mix, but at a 25 percent reduced development intensity. Based on the development under this alternative, construction-related energy impacts would be similar to or slightly less than the Project. The reduced development intensity could result in less vertical construction and potentially fewer vertical construction days, construction workers, material deliveries, and/or Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-17
construction equipment compared to the Project, which would result in a decrease in electricity and transportation fuel demands. The Project was determined to result in less than significant construction-related energy impacts. Thus, Alternative 2 would also result in less than significant construction-related energy impacts.

For operation-related energy impacts, Alternative 2 would result in similar to or slightly reduced impacts compared to the Project as it would develop the same land use types and mix, but at a reduced intensity by 25 percent. Similar to the Project, operation of the Alternative 2 would not result in inefficient, wasteful, or unnecessary energy demands. Overall, Alternative 2 would be designed and built to comply with the 2025 Building Energy Efficiency Standards and the 2025 California Green Building Standards Code (CALGreen). While it is anticipated that this alternative would generate less onsite renewable electricity compared to the Project due to the 25 percent reduction in land use intensity and available building rooftop space, it would still be designed to be in compliance with the photovoltaic (PV) and battery storage requirements of the 2025 Building Energy Efficiency Standards. Furthermore, Alternative 2 would also result in approximately 25 percent reduction in building energy demand and transportation fuels due to the reduction in building space developed and overall reduction in vehicle trips generated.

Alternative 2 would also result in less than significant operation-related energy impacts.

Additionally, because this alternative would still be subject to and comply with the PV and battery storage requirements of the 2025 Building Energy Efficiency Standards, it would support and align with the California Renewables Portfolio Standard (RPS) and the overall goal to transition the State to renewable energy. Overall, Alternative 2 would result in less than significant impacts, similar to the Project.

Geology and Soils
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, Alternative 2 would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because Alternative 2 would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking. Additionally, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to less than significant.

Similar to the Project, Alternative 2 is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Impacts related to seismic-related ground failure including liquefaction, soil erosion, on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse would be less than significant, and similar to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, Project Mitigation Measure MM GEO-1 would remain applicable under Alternative 2. Impacts would be the same as the Project.

Overall, impacts would be similar to the Project and would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-18
Greenhouse Gas Emissions
Alternative 2 would develop the same land use types and mix over the same project Site area as the proposed Project at a reduced development intensity of 25 percent. As discussed in the DEIR, the Project would generate GHG emissions and would not meet the net zero emissions threshold.

Additionally, overall, the Project would result in significant GHG emissions impacts even with incorporation of Mitigation Measures MM GHG-1 through MM GHG-7.

While Alternative 2 would reduce development intensity by 25 percent, thereby also reducing a proportionate amount of operation-related GHG emissions, it would still generate GHG emissions and would not meet the net zero emissions threshold. Thus, Alternative 2 would still require MM GHG-1 through MM GHG-7 as the Project. Similar to the Project, even with implementation of Mitigation Measures, Alternative 2 would still not achieve net zero GHG emissions and would have a substantial cumulative contribution to GHG emissions impacts.

Regarding consistency with the California Air Resources Board (CARB) Scoping Plan, this alternative would also be subject to the programs and regulations identified by the Scoping Plan and implemented by state, regional, and local agencies to achieve the statewide GHG reduction goals of AB 32 and SB 32. As stated, this alternative would still be subject to and comply with the 2025 Building Energy Efficiency Standards and the standards under 2025 CALGreen. It would install onsite PV and battery storage systems per the 2025 Building Energy Efficiency Standards and EV parking per the 2025 CALGreen. Therefore, and similar to the Project, this alternative would not obstruct implementation nor be inconsistent with the CARB Scoping Plan.

For the Kern Council of Governments (Kern COG) 2022 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), the Project was determined to interfere with Kern COG’s ability to implement the 2022 RTP/SCS. The Project would result in an overall net increase in countywide roadway vehicle miles traveled (VMT) under both existing and cumulative conditions. Overall, Alternative 2 would generate fewer average daily vehicle trips due to the reduced development intensity. Thus, the reduction in vehicle trips would also result in a reduction in overall total VMT compared to the proposed project. However, VMT is influenced by a variety of factors beyond development size, including trip lengths, customer travel behavior, employee commute patterns, regional accessibility, and the mix of on-site uses. Thus, although Alternative 2 could result in a reduction in VMT compared to the Project, the reduced development intensity under this alternative may not be sufficient to result in less than significant VMT impacts.

Therefore, and similar to the Project, this alternative would also be considered to be inconsistent with the Kern COG 2022 RTP/SCS.

Overall, impacts would be less under Alternative 2 than the Project; however, the impacts would remain significant and unavoidable.

Hazards and Hazardous Materials
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities.

However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Alternative 2 implementation would not serve to increase public or environmental exposure to hazardous materials.

Similar to the Project, impacts related to the routine transport, use, and disposal of hazardous materials under Alternative 2 would be less than significant. Operations would not emit hazardous Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-19
emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts would be less than significant. During both construction and long-term operation, development under Alternative 2 would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that the Alternative 2 would not impair an adopted emergency response plan or emergency evacuation plan.

Like the Project-related impacts, the hazards and hazardous materials impacts would remain less than significant under Alternative 2.

Hydrology and Water Quality
Similar to the Project, development under Alternative 2 would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site.

Similar to the Project, Alternative 2 would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, Alternative 2’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). Alternative 2 would be required to implement a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, Alternative 2 would not violate any water quality standards or waste discharge requirements. Similar to the Project, Alternative 2 would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

With compliance with regulations, impacts with regard to flooding or existing drainage pattern of the Project Site would be less than significant and would be similar to the Project. Any impacts regarding water quality standards or waste discharge requirements or groundwater recharge would be less than significant.

Thus, both the impacts under Alternative 2 and the Project would be less than significant.

Land Use and Planning
As described in Section 4.11, Land Use and Planning, of this Draft EIR the Project would not physically divide an established community. Similar to the Project, Alternative 2 would redevelop an undeveloped property into a commercial retail center. Construction and operation of the proposed Project would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. Alternative 2 would not include the development of new obstacles that would divide the existing community. Similar to the Project, Alternative 2 would not physically divide an established community, and no impact would occur.

Similar to the Project, Alternative 2 would not conflict with any land use plan, policy, or regulation.

As a new commercial use, Alternative 2 would be consistent with General Plan policies that seek to accommodate new development which complements existing uses and provides a mixture of Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-20
uses that supports the needs of residents. While smaller in scale than the Project, Alternative 2 would also provide a variety of new jobs.

Similar to the Project, Alternative 2 would redevelop the Project Site with a commercial marketplace development and seek a land use designation change to LI. This land use designation change would be consistent with the Project Site’s existing zoning designation and the City’s vision for the area.

Accordingly, Alternative 2 would have less than significant impacts. Impacts under Alternative 2 would be the same as the Project.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Similar to the Project, Alternative 2 would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts.

Impacts would be the same as the Project.

Noise
Construction Vehicles
Under the Alternative 2, it is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to Project. As such, the maximum number of workers and transport of materials to and from the construction site would remain similar to the proposed project and would result in incremental increases in noise levels along Rosedale Highway. Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Because Alternative 2 would require the same level of ground disturbance, similar levels of vendor and haul trips would be required. A maximum of 140 daily haul truck tips is estimated during off-site improvements. The addition of these construction trips would be temporary, resulting in a construction traffic noise increase of less than 0.1 dBA CNEL, and would not substantially increase ambient noise levels. Therefore, construction traffic noise impacts related to the Alternative 2 would be less than significant and similar to the Project.

Construction Equipment
Alternative 2 would require the same construction activities (e.g., site preparation, demolition, and paving) as the Project. As the overall site area would remain the same as the proposed Project, these construction activities would remain the same distance away from the nearby sensitive receptors as the Project. Similar to the Project, construction noise levels due to development of Phase 1 and Phase 2 would be below the Federal Transit Administration (FTA) thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, construction noise impacts related to the Alternative 2 would be less than significant and similar to the Project.

Construction Noise from Off-Site Roadway Improvements
Alternative 2 would include the roadway improvements along Rosedale Highway and Coffee Road, similar to the Project. Construction activities from roadway improvements would not expose surrounding sensitive receptors to prolonged periods of construction noise. Though some equipment could reach up to 85 dBA Leq at a distance of 50 feet, construction for the off-site improvements would progress in a linear fashion, generating less noise at each receptor each Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-21
day. The nearest off-site sensitive receptor is approximately 700 feet south of the proposed roadway improvements and noise levels would be up to 62 dBA Leq. Additionally, off-site roadway improvements under the Alternative 2 and the Project would be temporary and anticipated to last a limited period, and would not occur during nighttime hours.

Construction noise levels due to off-site roadway improvements of the Project and this alternative would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, as with the Project, off-site roadway improvements construction noise impacts related to the Alternative 2 would be less than significant.

Mobile-Source Noise Impacts
Alternative 2 assumes a 25 percent reduction of all proposed land uses, therefore, the Reduced Project Alternative would result in 25 percent less trips than the Project. Similar to the Project, The Reduced Project Alternative’s cumulative traffic noise increase over existing conditions would be less than significant.

Stationary-Source Noise Impacts
Operational noise generated by Alternative 2 would be lower than that of the Project due to the reduction in building area and associated activity levels. Because the same operational noise sources would remain under the Alternative 2, the nature of the operational noise impacts would be similar to those of the Project. However, the reduced scale of development would result in lower overall noise generation and fewer noise events. Therefore, like the Project-related impacts, the operational noise impacts under the Reduced Project Alternative would be less than significant.

Vibration
As the overall site would remain the same as the Project, construction activities under Alternative 2 would remain the same distance away from the nearby sensitive receptors.

Therefore, vibration impacts under the Alternative 2 would be less than significant and similar to the Project.

Population and Housing
As discussed in Section 4.14, Population and Housing, of this Draft EIR, it is anticipated that future employees of the Project would reside within the City and surrounding area, and commute to work. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Although the overall Project size would be reduced by 25% under Alternative 2, it is still anticipated that the future employees of the Project would reside within the City and surrounding area and commute to work. Therefore, similar to the Project, no increased demand for housing to accommodate workers is anticipated. Thus, impacts related to inducement of unplanned population growth would be the same and less than significant.

Public Services
Fire Protection
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for fire protection and emergency response during construction and operation would be less than significant. Alternative 2 would involve similar construction and operational activities as the Project Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-22
but would be slightly less than the Project. As such, Alternative 2 impacts to fire protection and emergency response would be less than significant and slightly less than the Project.

Police Services
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for police services during construction and operation would be less than significant.

Alternative 2 would involve similar construction and operational activities as the Project but would be slightly less than the Project. As such, Alternative 2 impacts to police services would also be less than significant.

Parks
Similar to the Project, Alternative 2 is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. As such, Alternative 2 impacts to parks would also be less than significant.

Schools
Like the Project, Alternative 2 would not generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of Alternative 2 would also be less than significant.

Other
Similar to the Project, Alternative 2 would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to libraries under Alternative 2 would also be less than significant.

Recreation
Similar to the Project, Alternative 2 would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, impacts to recreational facilities under Alternative 2 would also be less than significant.

Transportation
Because Alternative 2 would provide less commercial/retail floor area and fewer fueling pumps, it would be expected to attract fewer customers, support fewer employees, and generate fewer service and delivery trips than the Project. As a result, the total number of vehicle trips associated with the site would likely be lower than under the Project.

Alternative 2 would not fundamentally change the nature of the proposed development or its relationship to the surrounding transportation network and land use pattern. Alternative 2 would continue to function as a commercial/retail development serving customers, employees, and deliveries within the same general market area as the proposed Project. Therefore, the travel characteristics of Project generated trips, including trip lengths and travel patterns, would generally be expected to remain similar to those associated with the Project. However, because the overall intensity of development would be reduced, the total amount of vehicle travel generated by the site would likely be lower.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-23
While a reduction in Project intensity would be expected to reduce VMT relative to the Project, VMT is influenced by a variety of factors beyond development size, including trip lengths, customer travel behavior, employee commute patterns, regional accessibility, and the mix of on-site uses. No project-specific VMT analysis was prepared for the Reduced Project Alternative; therefore, the magnitude of any reduction in VMT cannot be quantified. As a result, it cannot be determined whether the reduction in development intensity would be sufficient to reduce the project's VMT impact to a less than significant level or avoid the significant VMT impact identified for the Project. Therefore, VMT impacts associated with Alternative 2 are assumed to significant and unavoidable.

Like the Project, development under Alternative 2 would include new bicycle and pedestrian access and amenities and would provide off-site improvements. Therefore, like the Project, Alternative 2 would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. Impacts would be less than significant and similar to the Project.

Similar to the Project, access points and driveways to the Alternative 2 Project would be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans.

Similar to the Project. Alternative 2 would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant and similar to the Project.

Similar to the Project, Alternative 2 would include a Construction Management Plan that would be submitted to the City for review and approval prior to construction. It would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures. The Construction Management Plan would help to ensure that Alternative 2 would not impact emergency access to the Project Site and surrounding areas during construction.

During operation, similar to the Project, Alternative 2 driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 2 would not impair an adopted emergency response plan. Impacts would be similar to the Project and would be less than significant.

Tribal Cultural Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 2. Impacts would be the same as the Project.

Utilities and Service Systems
As discussed in Section 4.18, Utilities and Services Systems, the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects. Impacts related to utilities and service systems would be less than significant. No mitigation measures were required.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-24
As the amount of development under Alternative 2 is 25% less than the Project, the demands on utilities would be less, and similar to the Project, Alternative 2 will not require the construction of new water, wastewater treatment, stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Therefore, impacts associated with both construction and operation of the Alternative 2 would be less than significant.

Similarly, Alternative 2 would have less than significant impacts to water demand and wastewater capacity as the Project and impacts would be less than significant. Similar to the Project, Alternative 2 would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Wildfire
Alternative 2 would be located within the same area as the Project and is not located in or near an SRA and does not contain lands classified as VHFHSZs. Similar to the Project, no impact would occur with respect to wildfire hazards.

Relationship of the Alternative to Project Objectives
As Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses, less development would occur and impacts would be reduced, however, this Alternative would not eliminate the Project’s significant and unavoidable impacts. With less development, the Project would meet the following objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

However, with reduced development, Alternative 2 would not meet the following objective related to employment and job growth to the same extent as the Project:
• Creation of new and future employment opportunities.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-25

5.5.3 Alternative 3: Existing General Plan/Zoning Alternative Description of the Alternative
Under this alternative, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, this alternative assumes the Project Site would be developed with a by-right use and no General Plan amendment or zone change is necessary. The Project Site’s current Public Facilities (P) designation, as well as the prohibitions in the deed restriction and restrictive covenant that encumber the property, significantly limit the types of uses permitted on the Project Site. Based on the site’s Public Facilities designation, the allowed uses are limited to the following:

Public Facilities (P): includes government buildings, hospitals, public utilities, cemeteries, sewage treatment plants, waste disposal sites and other publicly owned facilities.

For purposes of the analysis, the maximum allowable development of the Project Site is in accordance with the MBGP. Based thereon, Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices. All existing on-site uses, except the transmission facilities, would be removed to accommodate this alternative.

Under Alternative 3, the Project Site would be developed with approximately 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space, a 58,000 square foot laydown with detention basin, and a 5,300 square foot fueling facility. The alternative will also include 335,000 square feet of employee parking.1
Environmental Impacts
Aesthetics
Under Alternative 3, the proposed commercial retail center and associated uses such as markets, retail/restaurants, medical offices, health club, and associated parking and landscaping would not be developed. Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices.

Regarding scenic quality, aesthetic impacts would be greater, as the Project would not transform an underutilized site into an active infill commercial center with new restaurants, stores, landscaping, as well as new signage, distinctive landscape palettes, and other such elements that would provide a identity and cohesiveness to the Project Site. In addition, Alternative 3 would be less visually cohesive with the Project Site’s adjacent commercial development. Therefore, while visual quality impacts under Alternative 3 would be less than significant, they would be greater than the Project.
1 This alternative project was derived and scaled based on input from the City’s Public Works Department of desired improvements on a new 30-acre public works yard.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-26
As the Project Stie does not contain any special or unique scenic attributes, like rock outcroppings, native vegetation, or a substantial number of mature trees, similar to the Project, Alternative 3 would not block a view corridor of a scenic resource. Regarding light and glare, new sources of nighttime lighting or daytime glare would be introduced for safety and operations, but similar to the Project, impacts would be less than significant.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Similar to the Project, no impact would occur. Impacts would be the same under Alternative 3 as Project.

Air Quality
Regarding construction, the less intense development under Alternative 3 would result in less construction activity, less construction intensity, and an overall shorter construction duration compared to the Project. Based on these factors, it can reasonably be anticipated that Alternative 3 would result in lessened regional and localized construction impacts compared to the Project. Additionally, and similar to the Project, project-related construction activities under this alternative would also result in less than significant regional and localized air quality impacts.

Impacts would be less than the Project and would be less than significant.

For regional operation emissions and ambient air quality impacts, based on the land use types and amount under Alternative 3, it would generate 3,562 average daily trips (ADT) compared to the 13,185 ADTs that would be generated by the Project. This would result in a 73 percent reduction in vehicle trips. Additionally, this alternative would also result in lower building energy demands and area-source emissions (i.e., emissions from architectural coatings, landscaping equipment, and consumer cleaning products) due to the less intensive land use type and amount.

However, this alternative could result in the generation of fugitive dust (i.e., PM10 and PM2.5) associated with the 30-acre storage yard that would accommodate stockpiles.

Alternative 3 would likely reduce operation-related VOC and NOX emissions to below their respective SJVAPCD regional significance threshold and eliminate the need for Mitigation Measures AQ-1 and AQ-2. This alternative would also likely reduce overall CO and SOX emissions compared to the Project. Although stockpiles would be a new type of emissions source compared to the proposed Project, stockpile PM10 and PM2.5 fugitive dust emissions would be controlled through SJVAPCD Regulation II and Regulation VIII. Furthermore, it is anticipated that Alternative 3 would not result in exceedances of the SJVAPCD regional significance thresholds, ambient air quality standards, and the SJVAPCD significant impact levels (SILs). Compared to the Project, it is anticipated that Alternative 3 would result in less than significant regional air quality impacts without the need for incorporation of Mitigation Measures. Therefore, impacts are less than the Project.

Regarding operation-related health risk impacts, this alternative would introduce a 128,000 square-foot fleet services building. This land use could result in stationary equipment (e.g., spray booths) and use of products that generate TACs. However, stationary equipment or activity that could generate air toxics and may be associated with this facility would be regulated under Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-27
SJVAPCD regulations. Nevertheless, this land use could also potentially result in the idling of diesel-powered vehicles and equipment that would be serviced at this facility. Emissions from mobile sources would not be subject to SJVAPCD permitting regulations and could potentially increase health risk impacts to off-site receptors. For the 5,300 square-foot fueling facility, it would also be subject to the permitting requirements under SJVAPCD Regulation II, which would control potential health risk impacts from TACs.

As discussed in the DEIR, the Project would not accommodate the types of land uses that would generate substantial quantities of TACs. Furthermore, though the Project would include a gas station, this use would be subject to SJVAPCD Regulation II, which would ensure health risks impacts are controlled. Additionally, the Project would not generate the heavy-duty truck volumes necessary to potentially expose off-site sensitive receptors to substantial pollutant concentrations of TACs along the nearby truck routes. This alternative is also not anticipated to generate the level of heavy-duty truck volumes needed along the nearby truck routes to expose off-site sensitive receptors to substantial pollutant concentrations of TACs. However, this alternative would introduce a new land use type (i.e., fleet services building) not proposed under the Project that would generate onsite TACs, which could potentially result in greater health risk impacts to offsite receptors compared to the Project and the need to incorporate reduction measures to reduce potential health risk impacts to less than significant levels. Therefore, potential health risk impacts would be greater than the Project.

For CO hotspots, this alternative is anticipated to generate fewer overall vehicle trips compared to the Project due to the less intensive land use type and amount of development. The Project would not generate the volumes of traffic needed to generate a CO hotspot. Thus, like the Project, Alternative 3 would also not result in the volumes of traffic needed to generate a CO hotspot and would further reduce this possibility compared to the Project.

For operational odors, the fleet services building under Alternative 3 could potentially accommodate autobody activities that could involve auto painting and coating activities. These types of activities are the types of activities identified by the SJVAPCD that could potentially generate odors that could have a significant odors impact. Thus, Alternative 3 could result in a potentially significant operation-related odors impact, which would be a new impact compared to the Project.

Regarding consistency with the SJVAPCD AQMPs, because Alternative 3 would develop uses based on the existing MBGP land use and zoning designations, it would not conflict with the growth assumptions of the SJVAPCD AQMPs. Additionally, Alternative 3 would likely reduce operation-related VOC and NOX emissions to below the SJVAPCD regional significance thresholds and also not generate operation-emissions that exceed the SJVAPCD regional significance thresholds for the other criteria air pollutants. Furthermore, Alternative 3 would also likely not generate emissions that would exceed either the ambient air quality standards or the SJVAPCD SILs. Similar to the Project, Alternative 3 does not conflict with the SJVAPCD AQMPs, but would not require MM AQ-1 and AQ-2 compared to the Project.

Biological Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM BIO-1 through MM BIO-3 would remain applicable under Alternative 3. Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-28
Cultural Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 3. Impacts would be the same as the Project.

Energy
Based on the development under Alternative 3, construction-related energy impacts would be similar to or less than the Project. As stated, the less intensive land use types and overall amount of development could result in less construction activity, less construction intensity, and an overall shorter construction duration compared to the Project, so it would result in a decrease in electricity and transportation fuel demands. As discussed in the DEIR, the Project was determined to result in less than significant construction-related energy impacts. Thus, Alternative 3 would also result in less than significant construction-related energy impacts. However, impacts would be less than the Project.

For operation-related energy impacts, the less intensive land use types and overall amount of development under Alternative 3 would result in development of less overall building square footage and generate fewer vehicle trips compared to the Project. Thus, Alternative 3 would result in lower operation-related building energy and transportation fuel demands. Overall, Alternative 3 would result in less than significant operation-related energy impacts and impacts would be less than the Project.

Regarding consistency with the California Renewables Portfolio Standard, Alternative 3 would result in smaller overall building square footage and surface parking lot area than the proposed project, but it would still be required to comply with the applicable PV and battery storage requirements and EV parking standards. Thus, it would still align with the State goal of transitioning to renewable energy. Therefore, and similar to the Project, Alternative 3 would not conflict with the RPS.

Geology and Soils
As Alternative 3 is in the same location as the Project, impacts would be similar. Similar to the Project, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to less than significant.

Similar to the Project, Alternative 3 is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Impacts related to seismic-related ground failure including liquefaction, soil erosion, on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse would be less than significant, and similar to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, Project Mitigation Measure MM GEO-1 would remain applicable under Alternative 3. Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-29
Overall, impacts would be similar Project and would be less than significant.

Greenhouse Gas Emissions
Alternative 3 would develop a less intensive uses over a similarly sized Project Site compared to the Project. Thus, based on these characteristics, Alternative 3 could result in less construction activity, less construction intensity, and an overall shorter construction duration, so it would result in lower construction-related GHG emissions.

In addition, the less intensive land use types and smaller overall development amount under Alternative 3 would also be anticipated to result in lower building energy demand, water demand, wastewater generation, solid waste generation, and vehicle trips, which would result in lower overall operation-related GHG emissions compared to the Project. However, because Alternative 3 would still result in GHG emissions and not achieve net zero emissions, it would also have a substantial cumulative contribution to GHG emissions impacts.

In terms of consistency to the CARB Scoping Plan, Alternative 3 would be subject to and be designed to meet the 2025 Building Energy Efficiency Standards and 2025 CALGreen. Thus, it would comply with the PV and EV parking requirements of these two Standards. Therefore, overall, this alternative would not conflict or interfere with implementation of the CARB Scoping Plan.

Regarding consistency with the Kern COG 2022 RTP/SCS, the change in proposed uses from retail and commercial land uses to government office and maintenance use would change the travel demand and generate substantially fewer vehicle trips than the Project. The municipal maintenance and operations yard, under this alternative, would primarily support the delivery of public service operations within the City and would not serve as a destination for commercial and retail activities. The proposed facility’s vehicle trips would primarily consist of employee commute trips and municipal service vehicle trips and would not generate substantial new vehicle travel beyond what is required to serve the existing community. Thus, this alternative would qualify as a local-serving public facility/community institution and would be screened from detailed VMT analysis. Consequently, this alternative would result in less than significant VMT impacts and, unlike the proposed Project, this alternative would be considered consistent with the Kern COG 2022 RTP/SCS. Overall, impacts would be less than the Project but would be significant and unavoidable.

Hazards and Hazardous Materials
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities.

However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Alternative 3 implementation would not serve to increase public or environmental exposure to hazardous materials.

Similar to the Project, impacts related to the routine transport, use, and disposal of hazardous materials under Alternative 3 would be less than significant. During both construction and long-term operation, development under Alternative 3 would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 3 would not impair an adopted emergency response plan or emergency evacuation plan.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-30
Overall, impacts would be similar under Alternative 3 and would be less than significant.

Hydrology and Water Quality
Similar to the Project, development under Alternative 3 would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site.

Similar to the Project, Alternative 3 would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, Alternative 3’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). This Alternative would be required to implement a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, Alternative 3 would not violate any water quality standards or waste discharge requirements. Similar to the Project, Alternative 3 would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

With compliance with regulations, impacts with regard to flooding or existing drainage pattern of the Project Site would be less than significant and would be similar to the Project. Any impacts regarding water quality standards or waste discharge requirements or groundwater recharge would be less than significant.

Thus, impacts under Alternative 3 would be similar to the Project’s less than significant impacts.

Land Use and Planning
Similar to the Project, construction and operation of the Alternative 3 would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. Alternative 3 would not include the development of new obstacles that would divide the existing community. Similar to the Project, Alternative 3 would not physically divide an established community, and no impact would occur.

Under this alternative, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, Alternative 3 would be developed with a by-right use and no General Plan amendment.

Thus, as Alternative 3 would not require a land use designation change to LI, land use impacts would be less than the Project. Accordingly, impacts under Alternative 3 would be the less than the Project and would be less than significant.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Similar to the Project, Alternative 3 would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts.

Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-31
Noise
Construction Vehicles
Alternative 3 would result in less development intensity due to the reduced square footage of development. However, the Project Site area would remain the same and Alternative 3 would include various roadway improvements that would be implemented along Rosedale Highway and Coffee Road. It is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to the Project. As such, the maximum number of workers and transport of materials to and from the construction site would remain similar to the Project and would result in incremental increases in noise levels along Rosedale Highway.

Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Because Alternative 3 would require the same level of ground disturbance, similar levels of vendor and haul trips would be required. Similar to the Project, Alternative 3 would have a less than significant impact. Impacts would be less than the Project.

Construction Equipment
Regarding on-site construction, as the overall Project Site area would remain the same as the Project, these construction activities would remain the same distance away from the nearby sensitive receptors as the Project. Therefore, construction noise impacts related to Alternative 3 would be less than significant and less than the Project.

Construction Noise from Off-Site Roadway Improvements
Alternative 3 would include roadway improvements, similar to the Project. As with the Project, construction noise levels due to off-site roadway improvements under Alternative 3 would be below the FTA thresholds. Therefore, off-site roadway improvements construction noise impacts related to Alternative 3 would be less than significant and less than the Project.

Mobile-Source Noise Impacts
Average daily traffic (ADT) would be less under Alternative 3 than the Project. Therefore, traffic noise impacts related to the Existing General Plan/Zoning Alternative would be less than significant and less than the Project.

Stationary-Source Noise Impacts
Based on the reduction in overall development intensity and changes in land uses to office space, a fleet services building, construction equipment, and stockpile storage space, laydown and detention basin, and fueling facility under Alternative 3, this alternative would eliminate several of the highest-noise generating components compared to the Project, including the car wash and drive-through uses.

Unlike the Project, Alternative 3 would not include a commercial car wash facility and would therefore avoid noise associated with vehicle washing operations, vacuum stations, tunnel drying equipment, customer vehicle queuing, and related vehicle movements. Alternative 3 also would not include drive-through operations, eliminating noise generated by vehicle idling, acceleration, deceleration, and customer ordering activities. To the extent minor vehicle washing activities occur as an accessory use, such activities would be intermittent and would not be expected to generate noise levels comparable to those associated with a dedicated commercial car wash Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-32
facility. Consequently, several of the primary operational noise sources would be eliminated under Alternative 3.

Operational noise under Alternative 3 would primarily be generated by employee and visitor vehicle trips, parking lot activity, loading and unloading operations, fleet vehicle movements, and mechanical equipment such as HVAC systems. Office uses typically generate relatively low levels of operational noise, consisting primarily of vehicle trips during morning and evening commute periods and roof-top shielded HVAC operations. These noise sources are generally less intensive and occur less frequently than the customer oriented activities associated with the Project. The fleet services building would generate operational noise associated with fleet vehicle arrivals and departures and potential maintenance-related activities. Fleet vehicle activity may result in intermittent noise events, including engine start-ups, maneuvering, backup alarms, and truck loading activities. However, these activities would generally occur during normal business hours and would be concentrated within designated operational areas of the Project Site.

Although operational noise would continue to be generated with implementation of Alternative 3 by fleet operations, parking areas, loading activities, and HVAC equipment, the overall intensity and frequency of noise-generating activities would be expected to be lower than the proposed Project. Therefore, operational noise impacts associated with Alternative 3 would be reduced compared to those of the Project and impacts would be less than significant.

Population and Housing
Similar to the Project, future employees of the Project would reside within the City and surrounding area, and commute to work. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Alternative 3 would involve similar construction activities as the Project. Operational activities would be related to 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space. This Alternative would generate less employees than the Project. Thus, impacts related to inducement of unplanned population growth would be less than significant and less than the Project.

Public Services
Fire Protection and Police Services
The Project’s demand for fire protection and emergency response and police services during construction and operation would be less than significant. Alternative 3 would involve less construction activities and less intensive land uses than the commercial uses associated with the Project. Additionally, operations would typically not occur at night or on the weekends, unlike the Project. As such, Alternative 3 impacts to fire protection and emergency response and policies services would be less than significant and less than the Project.

Parksa
Similar to the Project, Alternative 3 is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-33
recreational facilities close to the Project site would be nominal. As such, Alternative 3 impacts to parks would be less than significant and less than the Project.

Schools
Like the Project, Alternative 3 would not generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of Alternative 3 would be less than significant and less than the Project.

Other
Similar to the Project, Alternative 3 would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to libraries under Alternative 3 would be less than significant and less than the Project.

Recreation
Similar to the Project, Alternative 3 would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, impacts to recreational facilities under Alternative 3 would be less than significant and less than the Project.

Transportation
Alternative 3 would replace the proposed retail and commercial uses with a municipal maintenance and operations yard. Alternative 3 would function as a maintenance and operations yard which functions as a public service facility that supports municipal operations. The facility would primarily accommodate public works employees, municipal fleet vehicles, equipment storage, and maintenance activities associated with typical local government services.

The primary function of public facilities and community institutions, such as government offices, public libraries, fire stations, police stations, and similar civic facilities is to provide essential public services to the local community and are not typically associated with inducing travel demand or significant increases in VMT.

The proposed municipal maintenance and operations yard is similar in function to other local-serving government facilities since it supports the delivery of public services within the City and does not serve as a destination for commercial and retail activities. It is anticipated that Alternative 3’s facility’s vehicle trips will primarily consist of employee commute trips and municipal service vehicle trips needed to maintain existing public infrastructure and provide municipal services throughout the City. Therefore, the facility is not expected to generate substantial new vehicle travel beyond what is required to serve the existing community and local jurisdiction. As a result, Alternative 3 would qualify as a local-serving public facility/community institution and would be screened from detailed VMT analysis. Therefore, Alternative 3 would result in a less than significant VMT impact. Impacts would be less than the Project.

Development under Alternative 3 would include new bicycle and pedestrian access. Therefore, like the Project, Alternative 3 would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities.

Impacts would be less than significant and similar to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-34
Similar to the Project, access points and driveways to Alternative 3 would would be reviewed with respect to standard Caltrans sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Similar to the Project. Alternative 3 would not substantially increase hazards due to a geometric design feature or incompatible land use.

Therefore, impacts would be less than significant and similar to the Project.

Similar to the Project, Alternative 3 would include a Construction Management Plan that would be submitted to the City for review and approval prior to construction. It would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures. The Construction Management Plan would help to ensure that Alternative 3 would not impact emergency access to the Project Site and surrounding areas during construction.

During operation, similar to the Project, Alternative 3 driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 3 would not impair an adopted emergency response plan. Impacts would be similar to the Project and would be less than significant.

Tribal Cultural Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 3. Impacts would be the same as the Project.

Utilities and Service Systems
As the amount of development under Alternative 3 would be less than the Project and would involve less water intensive land uses, therefore the demands on utilities would be less than the Project, Alternative 3 will not require the construction of new water, wastewater treatment, stormwater drainage, electric power, natural gas, or telecommunications facilities offsite.

Therefore, impacts associated with both construction and operation of the Alternative 3 would be less than significant.

Similarly, Alternative 3 would have less than significant impacts to water demand and wastewater capacity as the Project and impacts would be less than significant. Similar to the Project, Alternative 3 would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, impacts would be less than significant. Overall, impacts related to Alternative 3 would be less than the Project.

Wildfire
Alternative 3 would be located within the same area as the Project and is not located in or near an SRA and does not contain land classified as VHFHSZs. Similar to the Project, no impact would occur with respect to wildfire hazards.

Relationship of the Alternative to Project Objectives
Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. The Project Site would not provide as many new employment opportunities as the Project, nor would it develop a new commercial development Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-35
that would be harmonious with surrounding development that would visually improve the Project Site. Furthermore, Alternative 3 would not provide new commercial uses that would provide new activity and services for residents. Therefore, the future municipal maintenance and storage yard uses on the Project Site would not meet the following Project objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

5.6 Alternatives Considered but Rejected
CEQA Guidelines provide that the lead agency is responsible for selecting a range of project alternatives that are feasible and warrant further consideration. (CEQA Guidelines, §15126.6(a).) Among the factors that may be taken into account when addressing the feasibility of alternatives are site suitability, economic viability, availability of infrastructure, general plan consistency, and whether the proponent can reasonably acquire or gain access to an alternative site. (CEQA Guidelines, §15126.6(f)(1).) Alternatives may be eliminated from consideration in an EIR if they:
(i) fail to meet most of the project objectives; (ii) are infeasible; or (iii) fail to avoid significant environmental impacts. (CEQA Guidelines, §15126.6(c).) Alternatives whose effect cannot be reasonably ascertained and whose implementation is remote and speculative may also be eliminated from consideration. (CEQA Guidelines, §15126.6(f)(3).) The City considered several alternatives to the Project to reduce the impacts to traffic, greenhouse gas emissions, air quality, biological resources, cultural resources, ang geology and soils. The following alternative was initially considered but was eliminated from further consideration because it failed to meet most of the project objectives, was deemed infeasible, and did not reduce any significant impacts.

5.6.1 Alternative Site
Consideration was given to developing the Project, as proposed, on an alternative site within the City of Bakersfield. In considering this alternative, the following challenges were identified:
• The selection of any alternative site would have the same potential significant impacts as the current Project site.
• Due to the Project site’s unique characteristics, finding a comparable infill site of equal size is unlikely.
• An alternative site that is properly zoned and of equal size is not likely to meet the critical project objective of promoting infill development.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-36
• An alternative site of adequate size would likely be outside of an established urban area, resulting in potentially increased impacts to traffic and greenhouse gas emissions. • Neither the City nor the Applicant have ownership control of any alternative sites, rendering this alternative infeasible.

For these reasons, analysis of an alternative site was eliminated from further consideration in the EIR.

5.7 Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.

Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree. The comparative impacts of the Project and the Project Alternatives are summarized in Table 5-1: Comparison of the Impacts of the Project and Alternatives.

Of the alternatives analyzed in this Draft EIR, Alternative 1 would be considered the environmentally superior alternative because it would not involve new development and assumes that the Project Site would remain vacant under existing conditions. Although Alternative 1 would not meet any of the Project objectives, it would avoid all of the Project’s potentially significant impacts and significant and unavoidable impacts and would have reduced impacts compared to the Project. However, because Alternative 1 has been identified as the environmentally superior alternative, identification of another environmentally superior alternative is required.

Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.

However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activities to the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-37
Table 5-1: Comparison of the Impacts of the Project and Alternatives Impact Project Alternative 1:

No Build/No Project
Alternative 2: Reduced
Project Alternative
Alternative 3: Existing
General Plan/Zoning
Alternative
Aesthetics Less than Significant Impact Same — No Impact (Scenic Resource)
Less — No Impact
(Light and Glare)
Greater — No Impact
(Scenic Quality)
Same — Less Than
Significant Impact (Scenic
Resource)
Same — Less Than
Significant Impact (Light and
Glare)
Similar — Less than
Significant Impact (Scenic
Quality)
Same — No Impact (Scenic
Resource)
Same — Less Than
Significant Impact (Light and
Glare)
Greater — Less Than
Significant Impact (Scenic
Quality)
Agricultural and Forestry Resources No Impact Same — No Impact Same — No Impact Same — No Impact Air Quality Less than Significant Impact
with Mitigation
Less — No Impact Less — Less than Significant
Impact with Mitigation
Less — Less than Significant
Impact
Biological Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Cultural Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Energy Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Geology and Soils Less than Significant Impact
(Geology)
Less than Significant Impact
with Mitigation
(Paleontological Resources)
Less — No Impact Same — Less than Significant
Impact (Geology)
Same — Less than Significant
Impact with Mitigation
(Paleontological Resources)
Same — Less than Significant
Impact (Geology)
Same — Less than Significant
Impact with Mitigation
(Paleontological Resources)
Greenhouse Gas Emissions Significant and Unavoidable Less — No Impact Less — Significant and Unavoidable
Less — Significant and
Unavoidable
Hazards and Hazardous Materials Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Same — Less than Significant
Impact
Hydrology and Water Quality Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Same — Less than Significant
Impact
Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-38
Impact Project Alternative 1:

No Build/No Project
Alternative 2: Reduced
Project Alternative
Alternative 3: Existing
General Plan/Zoning
Alternative
Land Use and Planning Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Mineral Resources No Impact Less — No Impact Same — No Impact Same — No Impact Noise Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Population and Housing Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Public Services and Recreation Less than Significant Impact Less — No Impact Less — Less than Significant Impact
Less — Less than Significant
Impact
Transportation Significant and Unavoidable
(VMT)
Less — No Impact Same — Significant and
Unavoidable
Less — Less than Significant
Impact
Tribal Cultural Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Utilities and Service Systems Less than Significant Impact Less — No Impact Less — Less than Significant Impact
Less — Less than Significant
Impact
Wildfire No Impact Less — No Impact Same — No Impact Same — No Impact City of Bakersfield – SCH No. 2025101507 6-1

6. Other CEQA Considerations
This section summarizes the findings of the Draft Environmental Impact Report (EIR) with respect to irreversible environmental changes; significant and unavoidable environmental impacts; potential secondary effects related to Riverview Marketplace Commercial Project (Project) mitigation; growth-inducing impacts; and effects found to be less than significant.

6.1 Significant and Unavoidable Impacts
California Environmental Quality Act (CEQA) Guidelines Section 15126.2(b) requires that an EIR describe significant environmental impacts that cannot be avoided, including those effects that can be mitigated but not reduced to a less than significant level. As determined throughout Chapter 4, Environmental Analysis, of this Draft EIR, the Project’s significant impacts identified for Air Quality, Biological Resources, Cultural Resources, Geology and Soils, and Greenhouse Gas (GHG) Emissions are all addressed through mitigation measures that reduce impacts to less than significant levels. However, significant impacts identified for Transportation and GHG Emissions remain significant and unavoidable, with no mitigation available. Accordingly, the Project would have significant and unavoidable impacts.

6.2 Irreversible Environmental Changes
CEQA Guidelines Section 15126(c) requires an EIR to address any significant irreversible environmental changes that would occur should the proposed Project be implemented. CEQA Guidelines 15126.2(c) states:

Uses of nonrenewable resources during the initial and continued phases of the project may be irreversible since a large commitment of such resources makes removal or nonuse thereafter unlikely. Primary impacts and, particularly, secondary impacts (such as highway improvement, which provides access to a previously inaccessible area) generally commit future generations to similar uses.

Also, irreversible damage can result from environmental accidents associated with the project. Irretrievable commitments of resources should be evaluated to assure that such current consumption is justified.

The Project would necessarily consume limited, slowly renewable, and non-renewable resources.

This consumption would occur during the construction phase of the Project and would continue throughout its operational lifetime. Project development would require a commitment of resources that would include: (1) building materials, (2) fuel and operational materials/resources, and (3) the transportation of goods and people to and from the Project Site. Project construction would require the consumption of resources that are non-replenishable or may renew so slowly as to be considered non-renewable.

Energy resources needed for the construction and operation of the Project would contribute to the incremental depletion of renewable and nonrenewable resources. Resources, such as timber used in building construction, are generally considered renewable and would ultimately be replenished. Nonrenewable resources, such as petrochemical construction materials, steel, copper, lead, and other metals, gravel, concrete, and other materials, are typically considered finite and would not be replenished over the lifetime of the Project. Furthermore, nonrenewable fossil fuels such as gasoline and diesel would also be consumed in the use of construction Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-2
vehicles and equipment, as well as the transportation of goods and people to and from the Project Site. As stated in Section 4.6, Energy, of this Draft EIR, Project construction would create temporary increased demands for electricity and vehicle fuels compared to existing conditions and would result in short-term energy use from off-road mobile equipment and on-road vehicles.

Construction of the Project would not require electricity to power most construction equipment.

The majority of construction equipment would be gasoline or diesel-powered. It is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Additionally, it is anticipated that such equipment would be used on an as-needed basis.

Construction equipment would conform to California Air Resources Board (CARB) regulations and California emissions standards. In addition, there are no unusual Project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities or equipment that would not conform to current emissions standards (and related fuel efficiencies). Transportation energy use during the construction of the Project would come from delivery vehicles, haul trucks, construction employee vehicles, and off-road construction equipment. To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. In addition, the Project Site is served by numerous regional freeway systems (e.g., State Routes 99, 58, and 178) that provide the most direct routes from various areas of the region.

Moreover, all construction equipment would cease operating upon completion of the project construction.

Operation of the Project would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use. Operational energy use would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting. Operation of the Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop solar photovoltaic (PV) systems and battery storage systems. Thus, electricity use from the operation of the Project would not be considered inefficient, wasteful, or unnecessary.

The Project would generate demand for natural gas due to the heating and cooling for the building and for water. However, the Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing energy efficiency of the proposed buildings. For example, building insulation requirements would contribute to minimizing use of natural gas for heating. Thus, overall, the Project would not result in wasteful or unnecessary natural gas demands.

The Project would consume long-term transportation-related energy during operations from the use of motor vehicles. Project-related vehicle trips would primarily be generated from customers and employees. Additional vehicle trips to the Project Site would include deliveries, waste pick up, and maintenance trips. However, as discussed in Section 3.6, Energy, of this Draft EIR, it is Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-3
expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.

The Project would not affect access to existing resources, nor would it interfere with the production or delivery of such resources. The Project Site is currently undeveloped and contains no known energy resources that would be precluded from future use through Project implementation. Based on the above, the Project’s irreversible change to the environment related to the consumption of nonrenewable resources would be less than significant.

6.3 Growth-Inducing Impacts
CEQA Guidelines Section 15126.2(d) requires an EIR to discuss the ways a Project could foster economic or population growth or the construction of additional housing, directly or indirectly, in the surrounding environment. Growth-inducing impacts include the removal of obstacles to population growth (e.g., the expansion of a wastewater treatment plant allowing more development in a service area) and the development and construction of new service facilities that could significantly affect the environment individually or cumulatively. In addition, pursuant to CEQA, growth must not be assumed as beneficial, detrimental, or of little significance to the environment.

The Project Site is located in the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services.

The Project Site is surrounded by existing commercial uses to the north, west, and east.

As discussed in Section 4.14, Population and Housing, of this Draft EIR, the Project proposes the development of a commercial retail center and does not include a residential component that would result in residents and population within the City. As such, the Project would not directly induce population growth.

The Project would not include components such as the extension of roads or existing infrastructure that would result in the indirect population growth within the City. It is anticipated that construction workers and future employees of the Project would reside within the City and surrounding area, and commute to work. Although the operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Therefore, the Project would not induce substantial unplanned population growth and would not eliminate impediments to growth. Consequently, the Project would not foster growth inducing impacts.

Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-4
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 7-1

7. References
American Ornithologists’ Union. The A.O.U. Check-List of North American Birds. 6th ed., Allen Press, 1983. Supplements published 1985, 1987, 1989, 1991, 1993, and 1995.

AirNav, LLC. Airport Information. 2023, http://www.airnav.com/airports.

American Society of Civil Engineers. Minimum Design Loads and Associated Criteria for Buildings and Other Structures: Supplement 1. ASCE/SEI 7-16, effective 12 Dec. 2018.

American Society of Civil Engineers. Minimum Design Loads and Associated Criteria for Buildings and Other Structures: Supplement 3. ASCE/SEI 7-16, effective 5 Nov. 2021.

Bailey, Richard C. Heart of the Golden Empire: An Illustrated History of Bakersfield. Windsor Publications, 1984.

Bay Area Air Quality Management District. 2022 California Environmental Quality Act Air Quality Guidelines. Apr. 2023, www.baaqmd.gov/plans-and-climate/california-environmental-quality-act-ceqa/updated-ceqa-guidelines.

Bean, Lowell John, and Charles R. Smith. “California.” Handbook of North American Indians, edited by Robert F. Heizer, vol. 8, Smithsonian Institution, 1978.

Beyard, Michael D., et al. Shopping Center Development Handbook. 3rd ed., Urban Land Institute, 1999, p. 46.

Binford, Lewis R. “Willow Smoke and Dog’s Tails: Hunter-Gatherer Settlement Systems and Archaeological Site Formation.” American Antiquity, vol. 45, no. 1, 1980, pp. 4–20.

Burt, William H., and Richard P. Grossenheider. Peterson Field Guides: Mammals. Houghton Mifflin, 1980.

California Air Resources Board. 2004 Revision to the California State Implementation Plan for Carbon Monoxide: Updated Maintenance Plan for Ten Federal Planning Areas. 22 July 2004, ww3.arb.ca.gov/planning/sip/co/final_2004_co_plan_update.pdf.

California Air Resources Board. 2022 Scoping Plan for Achieving Carbon Neutrality. 16 Nov. 2022, ww2.arb.ca.gov/sites/default/files/2022-12/2022-sp.pdf.

California Air Resources Board. Air Pollution Data Monitoring Cards (2020, 2021, 2022, 2023, and 2024). www.arb.ca.gov/adam/topfour/topfour1.php.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-2
California Air Resources Board. Air Quality and Land Use Handbook: A Community Health Perspective. Apr. 2005, www.aqmd.gov/docs/default-source/ceqa/handbook/california-air-resources-board-airquality-and-land-use-handbook-a-community-health-perspective.pdf.

California Air Resources Board. Ambient Air Quality Standards. 16 July 2024, ww2.arb.ca.gov/sites/default/files/2024-
08/AAQS%20Table_ADA_FINAL_07222024.pdf.

California Air Resources Board. California Greenhouse Gas Emissions from 2000–2023:

Trends of Emissions and Other Indicators Report. 4 Nov. 2025, ww2.arb.ca.gov/sites/default/files/2025-11/nc-2000_2023_ghg_inventory_trends.pdf.

California Air Resources Board. California’s Advanced Clean Cars Midterm Review. 18 Jan. 2017, ww2.arb.ca.gov/sites/default/files/2020-01/ACC%20MTR%20Summary_Ac.pdf.

California Air Resources Board. Common Air Pollutants. ww2.arb.ca.gov/resources/common-air-pollutants.

California Air Resources Board. Final Staff Report: Update to the Toxic Air Contaminant List. 1999.

California Air Resources Board. Maps of State and Federal Area Designations. ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations.

California Air Resources Board. Proposed Update to the SB 375 Greenhouse Gas Emission Reduction Targets. Feb. 2018, ww2.arb.ca.gov/sites/default/files/2020- 06/SB375_Updated_Final_Target_Staff_Report_2018.pdf.

California Air Resources Board. SB 375 Regional Targets. ww2.arb.ca.gov/ourwork/programs/sustainable-communities-program/sb-375-regional-targets.

California Air Resources Board. Short-Lived Climate Pollutant Reduction Strategy. Mar. 2017, www.arb.ca.gov/cc/shortlived/shortlived.htm.

California Air Resources Board. The Report on Diesel Exhaust. 22 Apr. 1998, www.arb.ca.gov/toxics/dieseltac/de-fnds.htm.

California Climate Action Team. Climate Action Team Report to Governor Schwarzenegger and the Legislature. Mar. 2006.

California Climate Change Center. Our Changing Climate 2012: Vulnerability and Adaptation to the Increasing Risks from Climate Change in California. July 2012.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-3
California Department of Conservation, Geologic Energy Management Division. “Well Finder.” 2025, https://www.conservation.ca.gov/calgem/Pages/WellFinder.aspx.

California Department of Fish and Game. California’s Wildlife, Volume I: Amphibians and Reptiles. State of California Resources Agency, 1988.

California Department of Fish and Game. California’s Wildlife, Volume II: Birds. State of California Resources Agency, 1988.

California Department of Fish and Game. California’s Wildlife, Volume III: Mammals. State of California Resources Agency, 1988.

California Department of Fish and Game. Endangered and Threatened Animals List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. Endangered, Threatened, and Rare Plants. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. Natural Communities List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. RareFind Online Program: Database Record Search for Information on Threatened, Endangered, Rare, or Otherwise Sensitive Species.

State of California Resources Agency, 2015.

California Department of Fish and Game. Special Animals List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Wildlife. California Laws Protecting Native Plants: California Native Plant Protection Act. 2026, wildlife.ca.gov/Conservation/Plants/Laws.

California Department of Fish and Wildlife. CNDDB MGS Data: The Conservation Strategy for the Mohave Ground Squirrel. Natural Diversity Data Base, The Resources Agency of California, 2018.

California Department of Toxic Substances Control. “EnviroStor.” 2025, https://www.envirostor.dtsc.ca.gov/public/.

California Department of Transportation. Technical Noise Supplement (“TeNS”). Sept. 2013, prepared by ICF International,
http://www.dot.ca.gov/hq/env/noise/pub/TeNS_Sept_2013B.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-4
California Department of Transportation. Transportation and Construction Vibration Guidance Manual. Apr. 2020, prepared by ICF International,
https://dot.ca.gov/programs/environmental-analysis/noise-vibration/guidance-manuals.

California Department of Water Resources. Water Data Library Station Map: Wells 29S27E28C001M, 29S27E29K001M, 29S27E29C001M, and 29S27E20Q001M. Nov. 2024, wdl.water.ca.gov/waterdatalibrary/Map.aspx.

California Energy Commission. 2024 California Annual Retail Fuel Outlet Report Results (CEC-A15). www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/california-retailfuel-outlet-annual-reporting.

California Energy Commission. Amendments to the Building Energy Efficiency Standards (2022 Energy Code): Draft Environmental Report. 19 May 2021, CEC-400-2021-077-D.

California Energy Commission. Annual Oil Supply Sources to California Refineries. www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/annual-oilsupply-sources-california.

California Energy Commission. Electricity Consumption.
www.energy.ca.gov/datareports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-0.

California Energy Commission. Foreign Sources of Crude Oil Imports to California. www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/foreignsources-crude-oil-imports.

California Energy Commission. Natural Gas Consumption.
www.energy.ca.gov/datareports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-1.

California Energy Commission. Our Changing Climate: Assessing the Risks to California.

California Climate Change Center, 2006, CEC-500-2006-077.

California Energy Commission. The Future Is Now: An Update on Climate Change Science, Impacts, and Response Options for California. May 2009, CEC-500-2008-0077.

California Geological Survey. Guidelines for Evaluating and Mitigating Seismic Hazards in California. Special Publication 117A, 2008.

California Native Plant Society. California Rare Plant Ranks. 2026, www.cnps.org/rare-plants/california-rare-plant-ranks.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-5
California Natural Resources Agency. Safeguarding California: Reducing Climate Risk: An Update to the 2009 California Climate Adaptation Strategy. July 2014.

California Office of Emergency Services. California Adaptation Planning Guide. June 2020, www.caloes.ca.gov/HazardMitigationSite/Documents/CA-Adaptation-Planning-Guide-FINAL-June-2020-Accessible.pdf.

California Office of Statewide Health Planning and Development. Seismic Design Maps Website. seismicmaps.org.

California Public Resources Code, Section 5024.1(b).

California Public Utilities Commission. 2021 Padilla Report: Costs and Savings for the RPS Program (Public Utilities Code Section 913.3). May 2021, www.cpuc.ca.gov/- /media/cpuc-website/industries-and-topics/documents/energy/rps/2021-padilla-report_final.pdf.

California Public Resources Code, Section 21083.1(a).

California Public Resources Code, Section 5024.1(a).

California State Water Resources Control Board. “California PFAS Investigations.” 2025, https://www.waterboards.ca.gov/pfas/.

California State Water Resources Control Board. “GeoTracker PFAS Map.” 2025, https://geotracker.waterboards.ca.gov/map/pfas_map.

California State Water Resources Control Board. “GeoTracker.” 2025, https://geotracker.waterboards.ca.gov/.

City of Bakersfield. 2020 Urban Water Management Plan. Dec. 2021, www.calwater.com/docs/uwmp2020/BK_2020_UWMP_FINAL.pdf.

City of Bakersfield. Bakersfield Register of Historic Places. content.civicplus.com/api/assets/ee46706a-491d-4252-a2f2-b42a3f33988d.

City of Bakersfield. October 2022. City of Bakersfield Municipal Code. https://bakersfield.municipal.codes/Code/9.22.

City of Bakersfield. December 2002. General Plan Noise Element. https://content.civicplus.com/api/assets/37a2e20d-e610-431f-a222-9f4f2ecd2ddd.

City of Bakersfield. Historic Preservation. 2026, www.bakersfieldcity.us/256/Historic-Preservation.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-6
City of Bakersfield. Metropolitan Bakersfield General Plan: Circulation Element. 2002, p. III-4.

City of Bakersfield. Metropolitan Bakersfield Habitat Conservation Plan: Summary. 1994, docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat %20Conservation%20Plan.pdf.

City of Bakersfield. Standards and Specifications for Domestic Water Systems. 30 Sept. 2022, content.civicplus.com/api/assets/9b56b19c-bf08-40a8-bce4- 9c3158739407?cache=1800.

Code of Federal Regulations, title 36 (CFR) § 60.

Cogswell, Howard L. Water Birds of California. University of California Press, 1977.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 51, no. 219, 13 Nov. 1986, pp. 41206– 41206.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 65, no. 47, 9 Mar. 2000, pp. 12818– 12899.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 67, no. 10, 15 Jan. 2002, pp. 20020– 2095.

Environmental Risk Information Services. Aerial Photographs. 7 July 2025.

Environmental Risk Information Services. City Directory Report. 7 July 2025.

Environmental Risk Information Services. Fire Insurance Map Report. 2 July 2025.

Environmental Risk Information Services. Radius Map Report. 2 July 2025.

Environmental Risk Information Services. Topographic Maps. 2 July 2025.

Federal Highway Administration. Roadway Construction Noise Model (RCNM), Version 1.1. 2006, https://www.fhwa.dot.gov/Environment/noise/construction_noise/rcnm/.

Federal Transit Administration. Transit Noise and Vibration Impact Assessment Manual. Sept. 2018, US Department of Transportation.

General Technologies and Solutions. Vehicle Miles Traveled (VMT) Analysis: Riverview Market Commercial Development, City of Bakersfield, CA. 22 Dec. 2025.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-7
Governor’s Office of Land Use and Climate Innovation. CEQA and Climate Change:

Addressing Climate Change through CEQA Review. Technical Advisory, June 2008, opr.ca.gov/docs/june08-ceqa.pdf.

Governor’s Office of Land Use and Climate Innovation. State of California Tribal Consultation Guidelines: Supplement to General Plan Guidelines. 2014, nahc.ca.gov/wp-content/uploads/2019/04/SB-18-Tribal-Consultation-Guidelines.pdf.

Hickman, James C., editor. The Jepson Manual: Higher Plants of California. University of California Press, 1993.

Historic Aerials. Aerial Photography from the Past and Present. National Environmental Title Research, LLC, www.historicaerials.com.

Holland, Robert F. Preliminary Descriptions of the Terrestrial Natural Communities of California. Non-game Heritage Program, California Department of Fish and Game, 1986. Updated 1996.

Institute of Transportation Engineers. Trip Generation Manual. 12th ed., 2025.

Integrated Engineering Group. Rosedale & Coffee Commercial and Retail Project Traffic Assessment. 2022.

Integrated Engineering Group. Riverview Market Transportation Analysis. Jan. 2026.

Intergovernmental Panel on Climate Change. Climate Change 2001: The Third Assessment Report. Cambridge UP, 2001.

Intergovernmental Panel on Climate Change. Climate Change 2007: The Fourth Assessment Report. Cambridge UP, 2007.

Intergovernmental Panel on Climate Change. Climate Change 2013: The Fifth Assessment Report. Cambridge UP, 2013.

Intergovernmental Panel on Climate Change. Climate Change 2022: Sixth Assessment Report. Cambridge UP, 2023, www.ipcc.ch/assessment-report/ar6/.

International Energy Agency. Energy Efficiency Requirements in Building Codes: Energy Efficiency Policies for New Buildings. Mar. 2008.

JHK & Associates. Highway Traffic Data for Urbanized Area Project Planning and Design.

National Research Council, 2000, ajhassoc.com/wp-content/uploads/2017/01/Report255.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-8
Kern Council of Governments. 2022 Regional Transportation Plan/Sustainable Communities Strategy. 2022, www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf.

Kern County Subbasin Groundwater Sustainability Agencies. Kern County Subbasin Groundwater Sustainability Plan. Dec. 2024, kerngsp.com/wp-content/uploads/2024/12/Kern-Subbasin-2024-Groundwater-Sustainability-Plan.pdf.

Kimley-Horn. Rosedale & Coffee Rd–Riverview Market, Southwest Corner of Rosedale and Coffee Rd, Bakersfield, CA, Sewer Area Study. 5 Nov. 2025.

Kroeber, Alfred L. Handbook of the Indians of California. Smithsonian Institution, 1925. Dover Publications, 1976.

Leighton Consulting, Inc. Phase I Environmental Site Assessment – Former Pacific Gas & Electric Power Plant, Southwest of the Intersection of Rosedale Highway and Coffee Road, Bakersfield, California 93308. Apr. 2022.

Leighton Consulting, Inc. Subsurface Environmental Site Assessment – Oil Well Production Areas, Approximately 48-Acre Commercial Development Site, Southwest of Intersection of Rosedale Highway and Coffee Road, Bakersfield, California 93308. Mar. 2023.

Moyle, Peter B. Inland Fishes of California. University of California Press, 1976.

Munz, Philip A. A Flora of Southern California. University of California Press, 1974.

National Highway Traffic Safety Administration. Corporate Average Fuel Economy: NHTSA Announces New Proposal for CAFE and HDPUV Standards. 7 June 2024, www.nhtsa.gov/laws-regulations/corporate-average-fuel-economy.

National Highway Traffic Safety Administration. President Trump and Transportation Secretary Sean P. Duffy Unveil New “Freedom Means Affordable Cars” Initiative to Reset Fuel Economy Standards. 3 Dec. 2025, www.transportation.gov/briefing-room/president-trump-transportation-secretary-sean-pduffy-unveil-new-freedom-means.

National Highway Traffic Safety Administration. Resetting the Corporate Average Fuel Economy Program. Docket No. NHTSA-2025-0055, 11 June 2025, www.federalregister.gov/documents/2025/06/11/2025-10586/resetting-thecorporate-average-fuel-economy-program.

National Highway Traffic Safety Administration. USDOT Announces New Vehicle Fuel Economy Standards for Model Year 2024–2026. 1 Apr. 2022, www.nhtsa.gov/press-releases/usdot-announces-new-vehicle-fuel-economy-standards-model-year-2024- 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-9
Office of Environmental Health Hazard Assessment. Air Toxics Hot Spots Program Risk Assessment Guidelines: Guidance Manual for Preparation of Health Risk Assessments. Feb. 2015, oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf.

Office of Environmental Health Hazard Assessment. Indicators of Climate Change in California. May 2018, oehha.ca.gov/media/downloads/climate-change/report/2018caindicatorsreportmay2018.pdf.

Osborne, Richard H. “An Ethnographic Overview of the Southern Valley Yokuts.” Kern County Archaeological Society Journal, vol. 3, 1992, pp. 36–65.

Pacific Gas and Electric Company. 2024 Power Content Label: Pacific Gas and Electric Company. 2026, www.pge.com/assets/pge/docs/about/corporate-responsibility-and-sustainability/2024-pclpacific-gas-and-electric-company.pdf.

Pacific Gas and Electric Company. Company Profile. www.pge.com/en_US/about-pge/company-information/profile/profile.page.

Preston, William L. Vanishing Landscapes. University of California Press, 1981.

San Francisco Bay Regional Water Quality Control Board. Environmental Screening Levels.

July 2025.

San Joaquin Valley Air Pollution Control District. 2007 Ozone Plan. 30 Apr. 2007.

San Joaquin Valley Air Pollution Control District. 2007 PM10 Maintenance Plan and Request for Redesignation. 20 Sept. 2007,
www.valleyair.org/media/xmxlzxff/pm10maintenanceplan209-07.pdf.

San Joaquin Valley Air Pollution Control District. 2008 PM2.5 Plan. www.valleyair.org/rules-and-planning/air-quality-plans/particulate-matterplans/2008-pm25-plan/.

San Joaquin Valley Air Pollution Control District. 2009 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP). 16 Apr. 2009, www.valleyair.org/media/npmhpexf/ractsip-2009.pdf.

San Joaquin Valley Air Pollution Control District. 2012 PM2.5 Plan. 20 Dec. 2012, www.valleyair.org/media/b2jho5kt/completedplanbookmarked.pdf.

San Joaquin Valley Air Pollution Control District. 2013 Plan for the Revoked 1-Hour Ozone Standard. 19 Sept. 2013, ww2.valleyair.org/media/uwqfm4yq/adoptedplan.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-10
San Joaquin Valley Air Pollution Control District. 2014 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP). 19 June 2014, www.valleyair.org/media/42znjsez/2014-ract-sip.pdf.

San Joaquin Valley Air Pollution Control District. 2015 Plan for the 1997 PM2.5 Standard. 16 Apr. 2015, www.valleyair.org/media/ipxjiz3r/2015-pm25-plan_bookmarked.pdf.

San Joaquin Valley Air Pollution Control District. 2016 Moderate Area Plan for the 2012 PM2.5 Standard. 15 Sept. 2016, www.valleyair.org/media/ascouxxn/2016-plan.pdf.

San Joaquin Valley Air Pollution Control District. 2016 Ozone Plan for 2008 8-Hour Ozone Standard. 16 June 2016, www.valleyair.org/media/ed2f1tdd/adopted-plan.pdf.

San Joaquin Valley Air Pollution Control District. 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards. 15 Nov. 2018, archive.valleyair.org/pmplans/documents/2018/pm-plan-adopted/2018-Plan-for-the-1997-2006-and-2012-PM2.5-Standards.pdf.

San Joaquin Valley Air Pollution Control District. Air Quality Attainment Plans. valleyair.org/Air_Quality_Plans/air-quality-plans.htm.

San Joaquin Valley Air Pollution Control District. Ambient Air Quality Standards & Valley Attainment Status. www.valleyair.org/aqinfo/attainment.htm.

San Joaquin Valley Air Pollution Control District. Climate Change Action Plan: Final Staff Report: Addressing Greenhouse Gas Emissions Impacts under the California Environmental Quality Act. 17 Dec. 2009, ww2.valleyair.org/media/mdfm0lsd/1-ccap-final-ceqa-ghg-staff-report-dec-17-2009.pdf.

San Joaquin Valley Air Pollution Control District. District Policy APR 1925: Policy for District Rule 2201 AAQA Modeling. Rev. 6 May 2024, www.valleyair.org/media/341fy4sn/apr-1925-rule-2201-aaqa-modeling-may-2024.pdf.

San Joaquin Valley Air Pollution Control District. Frequently Asked Questions. www.valleyair.org/about/frequently-asked-questions/.

San Joaquin Valley Air Pollution Control District. Guidance for Assessing and Mitigating Air Quality Impacts. 19 Mar. 2015, www.valleyair.org/media/g4nl3p0g/gamaqi.pdf.

San Joaquin Valley Air Pollution Control District. Guidance for Valley Land-Use Agencies in Addressing GHG Emissions for New Projects. 17 Dec. 2009, www.valleyair.org/media/dnsnicdv/3-ccap-final-lu-guidance-dec-17-2009.pdf.

Sawyer, John O., and Todd Keeler-Wolf. A Manual of California Vegetation. California Native Plant Society, 1995.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-11
South Coast Air Quality Management District. 2012 Final Air Quality Management Plan. Feb. 2013, www.aqmd.gov/home/airquality/air-quality-management-plans/air-quality-mgt-plan/final-2012-air-quality-management-plan.

South Coast Air Quality Management District. Federal Attainment Plan for Carbon Monoxide. 1992.

South Coast Air Quality Management District. Final 2003 Air Quality Management Plan. 2003, www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/2003-aqmp.

South Coast Air Quality Management District. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. May 2005, www.aqmd.gov/docs/default-source/planning/air-quality-guidance/complete-guidance-document.pdf.

Spencer, Wayne D., et al. California Essential Habitat Connectivity Project: A Strategy for Conserving a Connected California. Prepared for California Department of Transportation, California Department of Fish and Game, and Federal Highway Administration, 2010.

State CEQA Guidelines, Section 15064.5(b)(1).

State CEQA Guidelines, 15064.5(b)(3).

State CEQA Statute and Guidelines, Section 15064.5(c)(4).

Stebbins, Robert C. A Field Guide to Western Reptiles and Amphibians. 2nd ed., Houghton Mifflin, 2003.

Thomas, David H. The Archaeology of Monitor Valley I: Epistemology. American Museum of Natural History, 1983. Anthropological Papers of the American Museum of Natural History, vol. 58, no. 1.

Tibor, David P., editor. California Native Plant Society’s Inventory of Rare and Endangered Plants of California. 6th ed., special publication no. 1, California Native Plant Society, 2001.

Transportation Research Board. Highway Capacity Manual. 7th ed., National Academies of Sciences, Engineering, and Medicine, 2022.

Twisselmann, Ernest C. A Flora of Kern County, California. University of San Francisco Press, 1967.

U.S. Energy Information Administration. Petroleum & Other Liquids: Crude Oil Production. www.eia.gov/dnav/pet/pet_crd_crpdn_adc_mbbl_a.htm.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-12
U.S. Environmental Protection Agency. Criteria Air Pollutants. www.epa.gov/criteria-air-pollutants.

U.S. Environmental Protection Agency. Endangerment and Cause or Contribute Findings for Greenhouse Gases under Section 202(a) of the Clean Air Act. Updated 27 Feb. 2025, www.epa.gov/climatechange/endangerment-and-cause-or-contribute-findings-greenhouse-gases-under-section-202a.

U.S. Environmental Protection Agency. EPA Releases Proposal to Rescind Obama-Era Endangerment Finding, Regulations That Paved the Way for Electric Vehicle Mandates. 29 July 2025, www.epa.gov/newsreleases/epa-releases-proposal-rescind-obama-era-endangerment-findingregulations-paved-way.

U.S. Environmental Protection Agency. EPA: Greenhouse Gases Threaten Public Health and the Environment. Dec. 2009,
archive.epa.gov/epapages/newsroom_archive/newsreleases/08d11a451131bca585257 685005bf252.html.

U.S. Environmental Protection Agency. Final Rule: Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles. 12 Mar. 2025, www.epa.gov/regulations-emissions-vehicles-andengines/final-rule-multi-pollutant-emissions-standardsmodel.

U.S. Environmental Protection Agency. Health and Environmental Effects of Hazardous Air Pollutants. www.epa.gov/haps/health-and-environmental-effects-hazardous-air-pollutants.

U.S. Environmental Protection Agency. Health Assessment Document for Diesel Engine Exhaust. National Center for Environmental Assessment, May 2002, EPA/600/8- 90/057F.

U.S. Environmental Protection Agency. Summary of the Energy Independence and Security Act. Updated 28 May 2025, www.epa.gov/laws-regulations/summary-energy-independence-and-security-act.

U.S. Fish and Wildlife Service. “Endangered or Threatened Wildlife and Plants.” Federal Register, 31 Oct. 1997, 50 CFR Part 17.

U.S. Fish and Wildlife Service. “Endangered or Threatened Wildlife and Plants; Animal Candidate Review for Listing as Endangered or Threatened Species.” Federal Register, 15 Nov. 1994, 50 CFR Part 17.

U.S. Fish and Wildlife Service. “Plant Taxa for Listing as Endangered or Threatened Species; Notice of Review.” Federal Register, 30 Sept. 1993, 50 CFR Part 17.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-13
U.S. Fish and Wildlife Service. Draft Revised Recovery Plan for the Mojave Population of the Desert Tortoise (Gopherus agassizii). California and Nevada Region, 2008.

Udvardy, Miklos D. F. National Audubon Society Field Guide to North American Birds. Alfred A.

Knopf, 1994.

United States Department of the Interior, National Park Service, Native American Graves Protection And Repatriation Act, 1990.

United States Department of the Interior, National Park Service. Technical Brief #20:

Archeological Damage Assessment: Legal Basis and Methods. 2007.

United States Department of the Interior, National Park Service. National Register Bulletin 15:

How to Apply the National Register Criteria for Evaluation. 1997, www.nps.gov/subjects/nationalregister/upload/NRB-15_web508.pdf. p. 8.

United States Department of the Interior, National Park Service. What Is the National Register of Historic Places? National Park Service, www.nps.gov/subjects/nationalregister/what-is-the-national-register.htm.

United States Department of Transportation. “National Pipeline Mapping System (NPMS) Public Map Viewer.” Pipeline and Hazardous Materials Safety Administration, 2025, https://www.npms.phmsa.dot.gov/PublicViewer/.

United States Environmental Protection Agency. “Drinking Water Health Advisories for PFOA and PFOS.” 2025, https://www.epa.gov/sdwa/drinking-water-health-advisories-pfoaand-pfos.

United States Geological Survey. Earthquake Ground Motion Parameters Application. earthquake.usgs.gov/research/hazmaps/design.

United States Geological Survey. Oildale, California. 7.5-minute topographic quadrangle map, 1968.

Wallace, William J. “The Southern Valley Yokuts, and the Northern Valley Yokuts.” Handbook of North American Indians, edited by William L. d’Azevedo, vol. 8, Smithsonian Institution, 1978, pp. 448–470.

Western Regional Climate Center. Period of Record Monthly Climate Summary, 10/01/1937 to 06/09/2016: Bakersfield AP, California (Station ID #040442). Western US Climate Summaries, wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca0442.

White House. Unleashing American Energy. 20 Jan. 2025,
www.whitehouse.gov/presidentialactions/2025/01/unleashing-american-energy/.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-14
Williams, Patricia, Leah Messinger, and Sarah Johnson. Habitats Alive! An Ecological Guide to California’s Diverse Habitats. California Institute for Biodiversity, 2008.

York. Heating and Air Conditioning Technical Guide. 2026. https://www.upgnet.com/dsmarketingprod/gatekeeper/Documents/Archive_CDs/York_2 014/PDF_FILES/528195-ytg-l-1014.pdf.

City of Bakersfield – SCH No. 2025101507 8-1

8. List of Preparers

8.1 Lead Agency
City of Bakersfield
Development Services Department – Planning Division
Ashley Knight, Assistant Planner
Roque Nino, Principal Planner
Jennie Eng, Assistant Planning Director
Viridiana Gallargo-King, Deputy City Attorney II

8.2 EIR Preparers
Kimley-Horn and Associates, Inc.

Jessie Barkley, Project Manager
Alex Jewell, Director
Rachel Krusenoski, Senior Planner
Jessie Fan, ENV SP, Senior Planner
Mayra Garcia, AICP, Planner
Barsin Bet Govargez, PE, Civil Engineer
Michael Lepore, PE, Civil Engineer
Chris Gregerson, PE, Transportation
Laura Forinash, PE, Transportation
Ace Malisos, Air Quality and Noise
Max Bieber, Cultural Resources
Jessica Mauck, Cultural Resources
Lawrence Ornelas, Graphics Support

8.3 Technical Subconsultants
PlaceWorks
• Air Quality, Greenhouse Gas Emissions, and Energy Technical Study • Noise and Vibration Technical Study
• Water Supply and Demand Analysis
• Urban Decay Analysis Technical Memorandum
Hernandez Environmental Services
• General Biological Assessment
BCR Consulting LLC
• Cultural Resources Assessment
Geotechnical Professionals Inc.
• Geotechnical Investigation
Riverview Market Commercial Project
Environmental Impact Report 8.0 List of Preparers
City of Bakersfield – SCH No. 2025101507 8-2
PETROtech Resources Company
• Engineering Review of Plugged & Abandoned Oil & Gas Wellbores Rincon Consultants, Inc.
• Phase I Environmental Site Assessment
Integrated Engineering Group
• Transportation Analysis
Appendix A
Notice of Preparation and Notice of Preparation
Comments
Appendix A
Notice of Preparation and Notice of Preparation
Comments
Kimley»Horn
Appendix A-1
Notice of Preparation and Notice of Preparation
Presentation
Appendix A-1
Notice of Preparation and Notice of Preparation
Presentation
Kimley»Horn
The applications filed with the City of Bakersfield includes the following:

The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:

This Notice of Preparation (NOP) has been prepared to notify agencies, organizations, and interested parties that the City of Bakersfield (City), as the Lead Agency, will prepare an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA) for the Coffee Road Ventures, LLC proposed Riverview Market Commercial Project (GPA File No. 23-0001) (Project). The City is requesting input from reviewing agencies and the public regarding the scope and content of the EIR.

The Project site is located in the northwestern portion of the City of Bakersfield (Figure 1, Regional Map). The Project Site is 46.16 acres which consists of one legal parcel (APN 368-010-05) and is an undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project site is zoned M-2 (General Manufacturing) which allows the proposed commercial retail center use.

The Project involves construction and operation of the Riverview Market, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger anchor building's interior to the Project site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thru, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. Project construction is anticipated to occur over an approximately 20-month timeframe, commencing in early 2026 and ending in late-2027.

October 31,2025
State Clearinghouse, Agencies, Organizations, and Interested Parties Riverview Market Commercial Project
DATE:

TO:

PROJECT:
• General Plan Amendment (GPA) (of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Site Plan Review consistent with the Bakersfield Municipal Code 17.08.140. • Tentative Subdivision Map
• Comprehensive Sign Plan
• Certification of an Environmental Impact Report

NOTICE OF PREPARATION OF AN

BAKERSFIELD ENVIRONMENTAL IMPACT REPORT
THE SOUND OF Sawtellinoy Belter
®
b_ NOTICE OF PREPARATION OF AN

BAKERSFIELD ENVIRONMENTAL IMPACT REPORT
THESOUNDOF SawtelbingBelfer
DATE: October 31, 2025
TO: State Clearinghouse, Agencies, Organizations, and Interested Parties PROJECT: Riverview Market Commercial Project
This Notice of Preparation (NOP) has been prepared to notify agencies, organizations, and interested parties that the City of Bakersfield (City), as the Lead Agency, will prepare an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA) for the Coffee Road Ventures, LLC proposed Riverview Market Commercial Project (GPA File No. 23-0001) (Project). The City is requesting input from reviewing agencies and the public regarding the scope and content of the EIR.

The Project site is located in the northwestern portion of the City of Bakersfield (Figure 1, Regional Map). The Project Site is 46.16 acres which consists of one legal parcel (APN 368-010-05) and is an undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of ElToro Viejo Road. The Project site is zoned M-2 (General Manufacturing) which allows the proposed commercial retail center use.

The Project involves construction and operation of the Riverview Market, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known aft this time. However, it is assumed that larger anchor building's interior to the Project site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thru, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. Project construction is anticipated to occur over an approximately 20-month timeframe, commencing in early 2026 and ending in late-2027.

The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:
e General Plan Amendment (GPA) (of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P {Public Facilities) to LI (Light Industrial) Site Plan Review consistent with the Bakersfield Municipal Code 17.08.140.

Tentative Subdivision Map
Comprehensive Sign Plan
Certification of an Environmental Impact Report
The applications filed with the City of Bakersfield includes the following:

The Notice of Preparation is available on the City’s website at the following URL:
https://www.bakersfieldcity.us/279/Environmental-Documents Opportunity for Public Review and Comment: The issuance of this NOP triggers a 32-day public scoping period. The scoping period begins on October 31, 2025, and ends on December 1, 2025. Comments may be sent to the City at any time during the 32-day public scoping period.

Please focus your comments on issues related to the scope and content of the environmental analysis that will be included in the EIR. All scoping comments must be received by the City or postmarked by December 1, 2025. Due to the time limits mandated by state law, the City recommends that your feedback is provided at the earliest possible date but not provided later than 32 days after the date of this notice. Trustee Agencies and Responsible agencies are asked to identify their statutory authorities pertaining to the Project. If applicable, please include the name and contact information of a contact person for your agency. Direct all comments to:

Scope of the EIR: In accordance with CEQA, the City requests that agencies review the description of the Project provided in this NOP and provide comments or guidance on the scope of environmental issues related to the statutory responsibilities of the Lead Agency. The EIR will be used by the City when considering the Project for approval and by other Responsible and Trustee Agencies to support their discretionary actions related to the Project, as applicable.

The City is also seeking comments from residents, property owners, and other interested parties regarding issues they believe should be addressed in the EIR. A regional map, local vicinity map, and site plan are attached.

Potential Environmental Impacts: The Draft EIR will examine potential environmental impacts generated by the project in relation to the following Environmental Analysis categories:

Aesthetics, Agricultural and Forest Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire.

The EIR will assess the effects of the Project on the environment, identify potentially significant impacts, identify feasible mitigation measures to reduce or eliminate potentially significant environmental impacts, and discuss potentially feasible alternatives to the Project that may accomplish basic objectives while lessening or eliminating any potentially significant Project-related impacts. • General Plan Amendment 23-0001 to change the general plan designation from P (Public Facilities) to Li (Light Industrial).
• Site Plan Review No. 23-0223 for the development of a 46.16-acre commercial retail development.

City of Bakersfield
Development Services Department - Planning Division
Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
e General Plan Amendment 23-0001 to change the general plan designation from P (Public Facilities) to LI (Light Industrial}.
e Site Plan Review No. 23-0223 for the development of a 46.16-acre commercial retail development,
Scope of the EIR: In accordance with CEQA, the City requests that agencies review the description of the Project provided in this NOP and provide comments or guidance on the scope of environmental issues related to the statutory responsibilities of the Lead Agency. The EIR will be used by the City when considering the Project for approval and by other Responsible and Trustee Agencies to support their discretionary actions related to the Project, as applicable.

The City is also seeking comments from residents, property owners, and other interested parties regarding issues they believe should be addressed in the EIR.A regional map, local vicinity map, and site plan are attached.

Potential Environmental Impacts: The Draft EIR will examine potential environmental impacts generated by the project in relation to the following Environmental Analysis categories:

Aesthetics, Agricultural and Forest Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire.

The EIR will assess the effects of the Project on the environment, identify potentially significant impacts, identify feasible mitigation measures to reduce or eliminate potentially significant environmental impacts, and discuss potentially feasible alternatives to the Project that may accomplish basic objectives while lessening or eliminating any potentially significant Project-related impacts.

The Notice of Preparation is available on the City's website at the following URL:
https://www.bakersfieldcity.us/279/Environmental-Documents Opportunity for Public Review and Comment: The issuance of this NOP triggers a 32-day public scoping period. The scoping period begins on October 31, 2025, and ends on December 1, 2025. Comments may be sent to the City at any time during the 32-day public scoping period.

Please focus your comments on issues related to the scope and content of the environmental analysis that will be included in the EIR. All scoping comments must be received by the City or postmarked by December 1, 2025. Due to the time limits mandated by state law, the City recommends that your feedback is provided at the earliest possible date but not provided later than 32 days after the date of this notice. Trustee Agencies and Responsible agencies are asked fo identify their statutory authorities pertaining to the Project. If applicable, please include the name and contact information of a contact person for your agency. Direct all comments to:

City of Bakersfield
Development Services Department —Planning Division
Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
Attachments:

Figure 1 - Regional Map
Figure 2 - Local Vicinity Map
Figure 3 - Conceptual Site Plan
An EIR public scoping meeting for the Project will be noticed separately. Comments may also be emailed to [email protected]
An EIR public scoping meeting for the Project will be noticed separately. Comments may also be emailed to [email protected]
Attachments:

Figure 1 —-Regional Map
Figure 2 - Local Vicinity Map
Figure 3 —Conceptual Site Plan
G9
Shafter
Smith Corner )) 66
8LL
T
Project Site &V

RIO BRAVO
OAES oiy 602,@2 1 78. Tarina Calders Corner ( A=====x! Hillcrest Bakersfield East Nd uX 85 SUNSET 85 85 P 85 Kayandee Edison
&V SEVEN OAKS 8L
Stevens VENOLA
Rexland Acres CAMPUS PARK Fuller Acres
85 119
Lamont
Di Giorgio El Adobe
Alameda Weedpatch Lakeside
I
SOURCE: Google Maps, 2024
FIGURE 1: Regional Location Map N

RIVERVIEW MARKET PROJECT STN
Kimley>»Horn
Pumpkin
Center
CORNER

MYRICKS

CITY IN

THE HILLS
East '
Bakersfield
Edmundson
Acres
Bakersfield
Municipal Airport
California State
University, Bakersfield
Rosedale Hwy--*r

GREENACRES
/d3ONV31O i
Niles
\

MYRICKS
N_ CORNER Shafter
go65
Smith ne
\
Ri, Bravo,
N|
! \
@3 — a : - CaldersiCornen RosedalesHwymgr

GREENACRES
Gor : . , 7 California State I 43 p SEVEN OAKS- ) University, Bakersfield BY ~~ } B ’ IN — | [I RET— Stevens bo venota-\
[CAMPUSPARK = = Tarina i i \ -RexlandAcres Bakersfield MunicipalFullerfAcres Airport | Pumpkin 1
Centery — Lamont
| — -— 184 ps
Col | ElAdobe DiGiorgio
f + -Alameda-- ———————, - t
Lakeside \ | 8 Weedpatch Edmulidson | | | Adres
SOURCE:GoogleMaps, 2024
N.T.S.
0 FIGURE1: RegionalLocationMap RIVERVIEWMARKETPROJECT
Kimley»Horn
= T ______ L_________ -- Mh.________ 1 _____ .-l^ ■ . I s e:
r m f! : “Set ‘ U,6- —l
■ %
eale . 3 'I
P—"teas2 L
**re—a
aE-n) he ttzde y s $ 7.

Mlllh” C I1 Tt t
DI—R
sil
■ Ml
J
J pgjem l d 0 a’W ’ COMMERCIAL hi
. "Ea15
■- SHO ====
sors —r
lVJdHNWOO.: -7* -IVIOdaNW00: glVNSQISAL Project Site 7 ;t i 2, " 79 i mm l > I INDUSTRIAL 3ardit seern I 4 als. _ V fel L 2‘ US P~ N‘ T9 * h -v.- Mime & t‘s t wr1 meslll 2 % ‘ (0 ©3 L 0.8,"99 LC r. wimweuBT==s E reee tt r I Si **. 8.9 - r / —io] l =* I
:ere
g ■ ==2/; T — #C._Mtu wetye ------- - ha
\----------------------
iie tee “F I Be 11 r< X L I WUII s
SOURCE: Google Earth Pro, 2024
FIGURE 2: Local Vicinity Map

RIVERVIEW MARKET PROJECT
Kimley>»Horn
39093aeBa

AVOUIUMOC
Li
euowuelOEeang
aeposod
gR
tassa
Jo
STN 4NB
Ie I
pi
9O
“y A i. 19.
7rs9
avkd! Biter LEL
I=
ss-nim
<Sn _E
PP., 2y A"A",
Y-"s
E.E’g . •
rrwm-d
. 6
aui
uu
y
lt
1444
ftte \ LESAES,
cl was-oul i 28
FIGURE2: LocalVicinity Map

RIVERVIEWMARKETPROJECT
Kimley»Horn
*
: *
zI 4
S' 4

1. I
J'
—
Ill
284 B8I
III II I I 1 “5 A0
|!
5 .okC
iprrrr p p l
&2II ‘4141114441
0-0-0
O
P 111
00 % weY 109 109007*9.
tn Ut1t
F
C
le
—DO
—
so—80
-0

STORAGE BLDG
(=500 UNITS)
=40,000 SF

SPPNKLERED
0 0 —
§ 1.
■wppp
opppp
5 819 42
m s c T
-9 82 r"IR Ii
3 n
44g ll 44 Bisisi IzT I e
' 8 :71 $
.Cx
E
3 2
======= I 3
4, Vig' ill l «I O
.g
I
J
1 ( I - I
4 t.
r
ii ।
Li
Xi s"
* 1 I i t 808—8 -

COFFEE ROAD
I
f
f
aslm 2 o 2 ■ 38 o
D 2 9 8
2 E7 8E
28 8
13 1962
HTHTHa.

PL b SHOPS 2 1
2 RETAIL/FAST—
‘ gtmmntnhTT cuuusu MA s (GTNJMMurf) WWAHTTT."5) "ni 1— 8 % Fst |YlYTl$ JTHTT 1 -9NKYO- 3018940 -
I........... 4............. 7 AGMSB, iiiiiiiuii J 7 2U
1111F if

10.000 SF

MAJOR D
!

SPRINKLERED
Swj MAJOR C 10,000 SF SPHNKLEHEP
1 MAJOR B .
. MARKET. s
34,971 SF 8

SPRINKLERED
CASUAL REST.

10.85BSF
GmimigminCLL-ra
MAR 5
. sPRTNRZERFD .

MAJOR G:

MAJOR F
RETAIL
18,012 SF
SPRINKLEHED mnuaoennD)
d.

IPAPAINC a | ML 75
000..........Mtte Q fWhM OnMM) WNTN 1
I
LreL I 13
I
tr i- #/ “0 —10MDE /
i// 3 //

MU-TI-JSE PATH
III
Il
Q
/// / ;
MAOX H
spRNKI RRED
DaHSTNNeS

MAJOR I
25,013 SF
SPRINKLERED 18-0

MAJOR J

SPRINKLERED
15 LANDSCAPES <
uu ullllLL*
(
9 - 7
I to-0E
TOMT“=
I
■ PROPERTY LINE MoVSISSul £
+HHL J - 8
t sd mu HIM dd
fffffTTIf “ffffffffTfffffff
tIIIIITHtIHHHHHHHHO-pTTTmnnns

OIIIIIIIIIIIIIIIIIIIII OPEN GREEN SPACE
)
II I1

PRELIMINARY I

RETENTION-BASIN J
ans
JVd
EkiSTNGRAFHC — sawL ......

RETAIL DT RESTAURANT 1V1S8 1 — I NON-SPRINKLEHED NON SPRINKLERED SPHINKLERED SPRINKLERED I
-PROPERTYLNE

PG&E SETBACK

DSCAPE SETBACK

PROPOSED LEFT

TURN POCKET

ISTING TRAFFIC
DT REST RETAIL.
10 WIDE
[MULTI-USE PATH
sEY&A&K

CASUAL DT/FAST
PAD 10
REST,

SPRINKLERED
RETAIL

SPRINKLEREDREST,PADS
SPRINKLERED _____ SPRINKLERED
______ 6,698 SF---
PAD 2 ----------CAR WASH-------- 4. log SF______ ______ DT/FAST CASUAL____________ RESTAURANT - - ROSEDALE HIGHWAY- -brnegsaunanr DT^PAN,- _______________________________________________________________ NON-SPRINKLERED RESTAURANT '/EAST CASUAL - -PAD_,——
SOURCE: McG Architecture, 2025
Kimley»Horn
N.T.S.
"NP FIGURE 3: Conceptual Site Plan

RIVERVIEW MARKET PROJECT

PROPOSEDLEFT TURNPOCKET
e_ PADS o_o __.__.__._________.\ _____ DT/FASTCASUAL _ “pang RESTAURANT RES sPRNHLERED ==ems — — ! SPAINKLERED SPRINKLCACD oo=ewaTAREE 500UNTTS) 40.000 SF
E

STORAGE BLDG
SPRINKLEREDe
+ +133 &
(Lr re KE
B=) Ll %
CONTROLLER FUEL CANOPY CONTROLLER CE FotisDoryCoon 308 SF DISPENSERS 120 SF —_—

CASUALREST,
SPRINKLERED Tafios RETAIL
||
|
iting
||
PAD | SrodetsrmemaL

COFFEE ROAD
FANRLFrED
SOURCE:McGArchitecture,2025
FIGURE3: ConceptualSitePlan

RIVERVIEWMARKETPROJECT
Kimley»Horn
J Project Site s t
L 5 [l A
- ‘S 9
51: "sas.

I
Riverview Market Commercial Project Overview
6/25/2026
Introductions
• Lead Agency: City of Bakersfield
1 2
r
Riverview Market Commercial Project Overview
pl — -- -hosi
er
■ AOSEDNB HGHWa-n L)
ah
Hl
5 178n t
—
E
10 TO r
5 I
8 3 4
1 • Roque Nino, Principal Planner
• Ashley Knight, Assistant Planner
%
#-
• EIR Preparer: Kimley-Horn and Associates, Inc.
• Jessie Barkley, Project Manager
Kimley>»Horn
Riverview Market
Commercial
Project
Environmental Impact Report (EIR)
Scoping Meeting
November 20, 2025
i
1 wa.

I
[EEN
6/25/2026
Riverview Market
Commercial
Project Environmental impact Report (EIR)
Scoping Meeting November 20, 2025
Kimley»Horn
§ Introductions
+ Lead Agency: City of Bakersfield
* Roque Nino, Principal Planner
+ Ashley Knight, Assistant Planner
+ EIR Preparer: Kimley-Horn and Associates, Inc.
+ Jessie Barkley, Project Manager
Riverview Market Commercial Project Overview Riverview Market Commercial Project Overview 6/25/2026
Riverview Market Commercial Project Overview CEQA Process P
/
eirortaktmmnouoscarBEG@GDGS®MON
fe
ton -
70 I
£
5 6
EIR Topics Purpose of an EIR
7 8
2 Aesthetics
Agriculture and Forestry
Air Quality
Biological Resources
Cultural Resources
Energy
Geology and Soils
Greenhouse Gas Emissions
Hazards and Hazardous Materials
Hydrology and Water Quality
Land Use and Planning
Mineral Resources
Noise
Population and Housing
Public Services
Recreation
Transportation / VMT
Tribal Cultural Resources
Utilities and Service Systems
Wildfire
Based on the NOP, the following topics will be addressed in the Project EIR:
• Shares information with the public regarding a project’s potential impacts • Identifies mitigation and ways to avoid/reduce impacts • Analyzes alternatives to the proposed project
• Fosters interagency coordination and public review
• Provides a comprehensive environmental document that serves as a guiding tool for decision makers
• The California Environmental Quality Act (CEQA) is required for discretionary approvals
• Purpose is to inform decision makers and the public of potential effects of project approval
• Identify ways to avoid or reduce environmental impacts • Define and analyze alternatives; and
• Foster inter-agency coordination and public review/participation 6/25/2026
CEQA Process Riverview Market Commercial Project Overview eB Ei, aoe dl]
« The California Environmental Quality Act (CEQA) is required for discretionary approvals = Purpose is to inform decision makers and the public of potential effects of project approval
«Identify ways to avoid or reduce environmental impacts = Define and analyze alternatives; and = Foster inter-agency coordination and public review/participation EIR Topics
Based on the NOP, the following topics will be addressed in the Project EIR: Purpose of an EIR
+ Shares information with the public regarding a project's potential impacts : Aesthetics : Vinorol ressurons + Identifies mitigation and ways to avoid/reduce impacts : Agricullura and Foresiry + Noise «Analyzes alternatives to the proposed project + Air Quality Population and Housing Public Services Recreation Transportation / VMT Tribal Cultural Resources Utilities and Service Systems Wildfire Biological Resources Cultural Resources Energy
Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology and Water Quality Fosters interagency coordination and public review
Provides a comprehensive environmental document that serves as a guiding tool for decision makers
6/25/2026
Purpose of a Scoping Meeting Environmental Review Process • Presents the project and environmental process
☆ Planning Commission
City Council
• No decision is being made on the project tonight File Notice of Determination □ = Opportunities for Public Input 77 = We are here in the process 9 10
Four Ways to Submit Comments By December 1, 2025
■ Submit written comments at this meeting
■ Speak at the podium
■ By email: [email protected]
Thank you
li 12
3 By mail: Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
REMINDER: Comments should be focused on the scope and content of the environmental information to be included in the Environmental Impact Report (EIR).

Scoping Meeting
November 20, 2025
• Provides an opportunity for public input (A scoping meeting is not the only opportunity for input)
♦ Public comments from the Notice of Preparation public review period and scoping meeting help inform the scope, focus, and content of the upcoming EIR.

Public & Agency
Revjota Reviseg Preft 5B
Prepare Final EIR including Responses
to Comments
Prepare EIR
Winter 2025 through Spring 2026
Prepare/Distribute Notice of Preparation
(30-day review ends December 1, 2025)
6/25/2026
Purpose of a Scoping Meeting Environmental Review Process | . Bistribute Notice of Preparation Presents the project and environmental process ciay review ends December1,2025) Prepare Final EIR including Responses " to Comments
«Provides an opportunity for public input (A scoping meeting is not the only Scoping Meeting Planning Commission opportunity for input) November 20, 2025 « Public comments from the Notice of Preparation public review period and PrepareEIR scoping meeting help inform the scope, focus, and content of the upcoming EIR. Winter 2025 through Spring 2006 City Council M Public &
« No decision is being made on the project tonight i w of vias File Notice of Determinatio iewperiodin 5 +d [Il - ovvortunities for Public Input ¢ = We are here in the process our Ways to Submit Comments By December 1, 2025
» Submit written comments at this meeting
Speak at the podium
» By email:[email protected]
» By mail: Attn: Ashley Knight, Assistant Planner 1715 Chester Avenue, 2nd Floor Bakersfield, CA 93301 Thank you REMINDER: Comments should be focused on the scope and content of the environmental information to be included in the Environmental Impact Report (EIR). 11 Appendix A-2
Notice of Preparation Comments
Appendix A-2
Notice of Preparation Comments
Kimley»Horn
CRICAN STATE OF CALIFORNIA Gavin Newsom, Governor
NATIVE AMERICAN HERITAGE COMMISSION CPOctober 31,2025
Re 2025101507 Riverview Market Commercial Project, Kern County Dear Ms. Knight:

Page 1 of 5 ends
← All documents from this meeting