43.5 99.1 99.6 69.3 99.456.5 0.9 0.4 30.7 0.6
Note:
Moisture Content (%)
Organic Material (%)
ASTM provides no guidelines for including information about the organic content of a sample in the description when the wet/dry liquid limit data is not available. CTL developed the following guidelines to fill this gap:
Ash Content (%)
0-5%: The organics are either not mentioned or mentioned as being "trace". 5-15%: The soil is considered as inorganic and is classified, as per ASTM 2487, with "with organics" included in the description. 15-50%: The soil is considered as organic and is described, per ASTM 2487. > 50%: The soil is described as "Peat".
SMWWTP-Ponds 4,6,8,11
Project Number: 223-184
687-224
Yeh & Associates
Furnace Dry wt. (440oC) (g)
Dish Number
Dish weight (g)
Soil, Org, Dish & H2O (g)
Project Name:
Visual Description
Boring
Sample
Depth (ft)
Oven Dry wt (110oC) (g)
Organic Content Test
ASTM D 2974-20 (Method A - 440 oC)
B33 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 8.2 6.7 1.4E-06
SAMPLE IMAGES
1.4 11.5 8.2 6.7 1.4E-06
6 7/11/24 151 23.2 1.4
1.4E-06
4 7/11/24 152 23.2 1.4 11.5 8.2 6.7 1.4E-06
6.7 1.4E-06
3 7/11/24 151 23.2 1.4 11.5 8.2 6.7
8.2 6.7 1.4E-06
2 7/11/24 152 23.2 1.4 11.5 8.2
μ, ksf io if kt, cm/s
1 7/11/24 151 23.2 1.4 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 151 23.2
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.87 0.87 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.3E-06
Deaired Tap-Water
Saturation, % 57% 85% Pipette Area, cm2 0.0314
Water Content, % 19.1% 28.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 86.6 86.6 Permeant
Mass, g 622.45 672.88
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
4" of poorly-graded SAND (SP with
1" of lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
20 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
58A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B34 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 18.5 17.5 2.5E-07
SAMPLE IMAGES
1.4 10.1 18.5 17.5 2.4E-07
6 7/11/24 240 22.8 1.4
2.5E-07
4 7/11/24 240 22.8 1.4 10.1 18.5 17.5 2.5E-07
17.5 2.5E-07
3 7/11/24 241 22.8 1.4 10.1 18.5 17.5
18.5 17.5 2.5E-07
2 7/11/24 238 22.8 1.4 10.1 18.5
μ, ksf io if kt, cm/s
1 7/11/24 237 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 242 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.57 0.57 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.3E-07
Deaired Tap-Water
Saturation, % 52% 85% Pipette Area, cm2 0.0314
Water Content, % 11.6% 18.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.1 103.1 Permeant
Mass, g 694.67 739.23
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
41A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B35 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 1.2 1.2E-05
SAMPLE IMAGES
1.4 10.1 1.5 1.2 1.2E-05
6 7/9/24 2100 22.4 1.4
1.2E-05
4 7/9/24 1200 22.4 1.4 10.1 1.5 1.3 1.2E-05
1.3 1.2E-05
3 7/9/24 1200 22.4 1.4 10.1 1.5 1.3
1.5 1.3 1.2E-05
2 7/9/24 1200 22.4 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/9/24 1200 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 2100 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.63 0.63 kavg 20ºC, cm/s 1.1E-05
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 81% 99% Pipette Area, cm2 0.263
Water Content, % 19.4% 23.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.7 99.7 Permeant
Mass, g 719.19 746.00
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND with silt (SP-SM) with lean CLAY (CL) seams:
light brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-03
CLASSIFICATION
Sieve Size % Passing Other Parameters
47 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B36 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 8.2 6.2 2.7E-06
SAMPLE IMAGES
1.4 10.1 8.2 6.2 2.7E-06
6 7/11/24 111 22.8 1.4
2.7E-06
4 7/11/24 111 22.8 1.4 10.1 8.2 6.2 2.7E-06
6.2 2.7E-06
3 7/11/24 112 22.8 1.4 10.1 8.2 6.2
8.2 6.2 2.7E-06
2 7/11/24 111 22.8 1.4 10.1 8.2
μ, ksf io if kt, cm/s
1 7/11/24 112 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 111 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.64 0.64 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.5E-06
Deaired Tap-Water
Saturation, % 97% 88% Pipette Area, cm2 0.0314
Water Content, % 23.7% 21.8%
TEST SUMMARYSample Type MCA
Dry Density, pcf 98.9 98.9 Permeant
Mass, g 739.15 727.37
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B37 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 0.6 1.0E-02
SAMPLE IMAGES
1.4 10.1 1.5 0.6 1.0E-02
6 7/9/24 10 22.4 1.4
1.0E-02
4 7/9/24 20 22.4 1.4 10.1 1.8 0.3 1.0E-02
0.3 1.0E-02
3 7/9/24 20 22.4 1.4 10.1 1.8 0.3
1.8 0.3 1.0E-02
2 7/9/24 20 22.4 1.4 10.1 1.8
μ, ksf io if kt, cm/s
1 7/9/24 20 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 10 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.60 0.60 kavg 20ºC, cm/s 9.6E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 30% 96% Pipette Area, cm2 0.263
Water Content, % 7.1% 22.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 101.1 101.1 Permeant
Mass, g 653.72 746.42
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): light
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
25.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
14 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B38 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP2-2
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit ---
2.00 #
4 (4.75mm) --- Plastic Limit ---
Poorly-graded SAND with silt (SP-SM): red yelllow with black staining, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 793.25 829.81
Water Content, % 20.4% 25.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 96.2 96.2 Permeant Deaired Tap-Water
Saturation, % 74% 95% Pipette Area, cm2 0.263
Void Ratio 0.73 0.73 kavg 20ºC, cm/s 1.9E-03
Diameter, in 2.42 2.42 Tested By ND
Height, in 5.67 5.67
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 26.09 26.09
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 60 19.5
μ, ksf io if kt, cm/s
1 4/16/24 60 19.5 0.6 11.5 1.1 0.5 1.7E-03
2 4/16/24 60 19.5 0.6 11.5 1.1
3 4/16/24 60 19.5 0.6 11.5
0.6 11.5 1.1 0.4 1.9E-03
0.4 1.9E-03
1.1 0.4
6 4/16/24 60 19.5 0.6
1.9E-03
4 4/16/24 60 19.5
11.5 1.1 0.4 1.9E-03
SAMPLE IMAGES
0.6 11.5 1.1 0.4 1.9E-03
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B39 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
TempAvg, ºC σ', ksf μ, ksf io REMARKS
Test Method: ASTM D5084 (Method C)
kt, cm/s
0.6 1.0 0.6
0.6 11.5 1.0 0.6
1.0 0.6
1.0 120
4/16/24
1.0 0.6 6.3E-04
6.3E-04
6.3E-04
if
SAMPLE IMAGES
5 4/16/24
0.6 19.3 0.6 11.5
19.3 0.6 11.5
6.3E-04
19.3 MCA
ND
120 0.6 11.5
6.3E-04
0.6 11.5 6.3E-04
120 0.6 11.5 1.0
4 120
19.3 2 4/16/24 120 19.3
4/16/24 19.3
PERMEATION DATA
Trial Date Time, sec
3 6 4/16/24 120
1 4/16/24
Volume, in3 25.99 25.99
kavg 20ºC, cm/s 6.4E-04
Area, in2 4.52 4.52
Diameter, in 2.40 2.40 Tested By TEST SUMMARY
Void Ratio 0.63
5.75 5.75
Dry Density, pcf 102.5 102.5 Deaired Tap-Water
Saturation, % 89% 100% 0.263
Water Content, % 20.8% 23.3% Sample Type
844.67 862.60
#
200 (0.075mm)
Mass, g
---
Silty SAND (SM): red yelllow with
black staining, moist
SAMPLE PROPERTIES
Intial Final
#
100 (0.150mm) ---
0.63 Permeant
Pipette Area, cm2
Height, in
---
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
--- Plastic Limit
% Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit ---
24TP2-4
CLASSIFICATION
Sieve Size
2.00 #
4 (4.75mm)
SAMPLE ID
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B40 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.8 0.3 9.7E-03
SAMPLE IMAGES
1.4 10.1 1.8 0.3 9.6E-03
6 7/10/24 20 22.5 1.4
9.7E-03
4 7/10/24 15 22.5 1.4 10.1 1.5 0.4 9.7E-03
0.4 9.7E-03
3 7/10/24 15 22.5 1.4 10.1 1.5 0.4
1.5 0.4 9.6E-03
2 7/10/24 15 22.5 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/10/24 15 22.5 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/10/24 20 22.5
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.61 0.61 kavg 20ºC, cm/s 9.1E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 45% 90% Pipette Area, cm2 0.263
Water Content, % 10.6% 21.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 100.6 100.6 Permeant
Mass, g 671.69 736.09
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): gray
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
61 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B41 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 9.5 7.7 1.2E-06
SAMPLE IMAGES
0.6 11.5 9.5 7.7 1.2E-06
6 5/29/24 156 21.2 0.6
1.2E-06
4 5/29/24 156 21.2 0.6 11.5 9.5 7.7 1.2E-06
7.7 1.2E-06
3 5/29/24 156 21.2 0.6 11.5 9.5 7.7
9.5 7.7 1.2E-06
2 5/29/24 156 21.2 0.6 11.5 9.5
μ, ksf io if kt, cm/s
1 5/29/24 158 21.2 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 156 21.2
Volume, in3 20.04 20.04
Height, in 4.36 4.36 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.2E-06
Deaired Tap-Water
Saturation, % 96% 100% Pipette Area, cm2 0.0314
Water Content, % 30.3% 31.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.5 92.5 Permeant
Mass, g 633.97 640.95
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): olive brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.79
---
4 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-1
CLASSIFICATION
Sieve Size % Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B42 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.4 0.3 1.3E-02
SAMPLE IMAGES
0.6 11.5 1.4 0.3 1.3E-02
6 5/31/24 15 21.8 0.6
1.3E-02
4 5/31/24 15 21.8 0.6 11.5 1.4 0.3 1.3E-02
0.3 1.4E-02
3 5/31/24 15 21.8 0.6 11.5 1.4 0.3
1.4 0.3 1.3E-02
2 5/31/24 15 21.8 0.6 11.5 1.4
μ, ksf io if kt, cm/s
1 5/31/24 15 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 15 21.8
Volume, in3 25.04 25.02
Height, in 5.44 5.44
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.56 0.56 kavg 20ºC, cm/s 1.3E-02
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 34% 95% Pipette Area, cm2 0.263
Water Content, % 7.4% 20.5%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.8 103.8 Permeant
Mass, g 732.71 821.82
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): red
yellow, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
3.50 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-6
CLASSIFICATION
Sieve Size % Passing Other Parameters
3 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B43 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 15.5 14.2 5.5E-07
SAMPLE IMAGES
0.6 11.5 15.5 14.2 5.5E-07
6 5/31/24 200 21.8 0.6
5.6E-07
4 5/31/24 199 21.8 0.6 11.5 15.5 14.2 5.5E-07
14.2 5.7E-07
3 5/31/24 197 21.8 0.6 11.5 15.5 14.2
15.5 14.2 5.8E-07
2 5/31/24 194 21.8 0.6 11.5 15.5
μ, ksf io if kt, cm/s
1 5/31/24 188 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 199 21.8
Volume, in3 27.14 27.14
Height, in 6.00 6.00 Tested By GF
Area, in2 4.52 4.52
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.69 0.69 Annulus Area, cm2 0.7671
Diameter, in 2.40 2.40 kavg 20ºC, cm/s 5.4E-07
Deaired Tap-Water
Saturation, % 84% 96% Pipette Area, cm2 0.0314
Water Content, % 21.4% 24.6%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.8 99.8 Permeant
Mass, g 863.09 885.38
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): yellowish brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.7
---
3 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B44 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.8 1.0 7.1E-04
SAMPLE IMAGES
0.6 11.5 1.8 1.0 7.1E-04
6 5/31/24 90 21.9 0.6
7.1E-04
4 5/31/24 90 21.9 0.6 11.5 1.8 1.0 7.1E-04
1.0 7.0E-04
3 5/31/24 90 21.9 0.6 11.5 1.8 1.0
1.8 1.0 7.1E-04
2 5/31/24 90 21.9 0.6 11.5 1.8
μ, ksf io if kt, cm/s
1 5/31/24 90 21.9 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 90 21.9
Volume, in3 23.02 23.02
Height, in 5.01 5.01
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.78 0.78 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 98% 100% Pipette Area, cm2 0.263
Water Content, % 29.1% 29.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.4 92.4 Permeant
Mass, g 720.97 724.54
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
SILT (ML): yewwlow brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.64
---
3.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-9
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B45 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP11-5
CLASSIFICATION
Sieve Size % Passing Other Parameters
9 3/8-in. (9.5mm) --- Liquid Limit ---
5.00 #
4 (4.75mm) --- Plastic Limit ---
Sandy SILT (ML): brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 652.05 659.68
Water Content, % 28.4% 30.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 89.4 89.4 Permeant Deaired Tap-Water
Saturation, % 91% 96% Pipette Area, cm2 0.263
Void Ratio 0.82 0.82 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Height, in 4.70 4.70
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 21.64 21.64
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 180 21.2
μ, ksf io if kt, cm/s
1 5/29/24 180 21.2 0.6 11.5 1.3 0.4 6.9E-04
2 5/29/24 180 21.2 0.6 11.5 1.3
3 5/29/24 180 21.2 0.6 11.5
0.6 11.5 1.3 0.4 7.0E-04
0.4 7.0E-04
1.3 0.4
6 5/29/24 180 21.2 0.6
7.0E-04
4 5/29/24 180 21.2
11.5 1.3 0.4 7.0E-04
SAMPLE IMAGES
0.6 11.5 1.3 0.4 7.0E-04
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B46 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-4
3 4
TempAvg, ºC
Sandy lean CLAY (CL): yelllow
brown, moist
5.26 4.52
23.80 24.2%
101.8
100%
0.66 kt σ', ksf μ, ksf , cm/s
Permeant
Pipette Area, cm2
kavg 20ºC, cm/s
Annulus Area, cm2
REMARKS
16.2 5.0E-07
5.1E-07
5.1E-07
16.2 16.2
5.1E-07
5.0E-07
0.6 if
16.2 16.2
16.2 0.6 11.5 17.6
17.6 17.6
11.5 11.5
11.5 17.6
17.6 Void Ratio
Diameter, in
Tested By ND
4.52 Test Method: ASTM D5084 (Method F)
2.40 5.26
23.80 772.64
0.6 0.6
0.6 11.5 5.1E-07
Date Time, sec
SAMPLE PROPERTIES
Intial Final
Mass, g
Water Content, %
Dry Density, pcf
Saturation, %
Height, in
Area, in2
Volume, in3
21.5%
101.8
5 4/16/24
188
4/16/24 191
Trial
4/16/24 190
189
6 20.3
4/16/24
3 20.3
20.3 20.3
4/16/24 190 20.3
SAMPLE IMAGES
2 1 4/16/24 192 17.6
PERMEATION DATA
io
4 20.3
0.6 11.5
#
100 (0.150mm)
Sample Type
#
200 (0.075mm)
---
---
TEST SUMMARY
MCA
Deaired Tap-Water
0.0314
5.0E-07
0.7671
89%
0.66 2.40
789.34
CLASSIFICATION
Sieve Size % Passing Other Parameters
3/8-in. (9.5mm) Liquid Limit ---
---
---
2.7 Plastic Limit
Plasticity Index #
16 (1.18mm)
#
30 (0.6mm)
---
--- #
4 (4.75mm)
---
---
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B47 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit ---
3.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY (CL): yelllow brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.84
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 823.70 830.62
Water Content, % 32.2% 33.3%
TEST SUMMARYSample Type MCA
Dry Density, pcf 91.2 91.2 Permeant Deaired Tap-Water
Saturation, % 97% 100% Pipette Area, cm2 0.0314
Void Ratio 0.94 0.94 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.9E-07
Height, in 5.66 5.66 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 26.03 26.03
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/17/24 190 21.8
μ, ksf io if kt, cm/s
1 4/17/24 152 21.8 0.6 11.5 16.4 15.9 2.2E-07
2 4/17/24 162 21.8 0.6 11.5 16.4
3 4/17/24 188 21.8 0.6 11.5
0.6 11.5 16.4 15.9 1.8E-07
15.9 2.0E-07
16.4 15.9
6 4/17/24 189 21.8 0.6
1.8E-07
4 4/17/24 181 21.8
11.5 16.4 15.9 1.7E-07
SAMPLE IMAGES
0.6 11.5 16.4 15.9 1.7E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B48 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-11
CLASSIFICATION
Sieve Size % Passing Other Parameters
8 3/8-in. (9.5mm) --- Liquid Limit ---
2.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY with sand (CL): yelllow
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.73
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 682.12 696.59
Water Content, % 29.2% 32.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 90.8 90.8 Permeant Deaired Tap-Water
Saturation, % 91% 100% Pipette Area, cm2 0.0314
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.8E-07
Height, in 4.82 4.82 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 22.15 22.15
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 141 19.9
μ, ksf io if kt, cm/s
1 4/16/24 195 19.9 0.6 11.5 19.3 18.7 1.4E-07
2 4/16/24 162 19.9 0.6 11.5 19.3
3 4/16/24 140 19.9 0.6 11.5
0.6 11.5 19.3 18.7 2.1E-07
18.7 1.7E-07
19.3 18.7
6 4/16/24 148 19.9 0.6
2.0E-07
4 4/16/24 132 19.9
11.5 19.3 18.7 1.9E-07
SAMPLE IMAGES
0.6 11.5 19.3 18.7 2.0E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B49 of 49
APPENDIX C – HISTORICAL AERIAL PHOTOS
The EDR Aerial Photo Decade Package
Santa Maria Waste Water Treatment Plant 601 Black Road Santa Maria, CA 93458 Inquiry Number: January 09, 2024 7536673.1 6 Armstrong Road, 4th floor
Shelton, CT 06484
Toll Free: 800.352.0050
www.edrnet.com
C1 of 18
2020 1"=875' Flight Year: 2020 USDA/NAIP
2016 1"=875' Flight Year: 2016 USDA/NAIP
2012 1"=875' Flight Year: 2012 USDA/NAIP
2009 1"=875' Flight Year: 2009 USDA/NAIP
2006 1"=875' Flight Year: 2006 USDA/NAIP
2002 1"=875' Flight Date: June 04, 2002 USGS
1994 1"=875' Acquisition Date: January 01, 1994 USGS/DOQQ 1981 1"=875' Flight Date: October 18, 1981 USDA
1978 1"=875' Flight Date: September 22, 1978 USGS
1975 1"=875' Flight Date: December 01, 1975 USGS
1967 1"=875' Flight Date: June 27, 1967 USGS
1960 1"=875' Flight Date: April 01, 1960 USGS
1954 1"=875' Flight Date: February 21, 1954 USDA
1949 1"=875' Flight Date: March 28, 1949 USDA
1943 1"=875' Flight Date: September 21, 1943 USDA
1938 1"=875' Flight Date: January 22, 1938 FAIR
EDR Aerial Photo Decade Package 01/09/24 Santa Maria Waste Water Treatment Plant Site Name: Client Name: Yeh and Associates 601 Black Road 391 Front Street,Suite D Santa Maria, CA 93458 Grover Beach, CA 93433 EDR Inquiry # 7536673.1 Contact: Luke Salemme Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade. Search Results: Year Scale Details Source
When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive. Disclaimer - Copyright and Trademark Notice Copyright 2024 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission.
EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, LLC or its affiliates. All other trademarks used herein are the property of their respective owners. 7536673 - 1 page 2 This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, LLC. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. This Report is provided on an “AS IS”, “AS AVAILABLE” basis. NO WARRANTY EXPRESS OR IMPLIED IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT.
ENVIRONMENTAL DATA RESOURCES, LLC AND ITS SUBSIDIARIES, AFFILIATES AND THIRD PARTY SUPPLIERS DISCLAIM ALL WARRANTIES, OF ANY
KIND OR NATURE, EXPRESS OR IMPLIED, ARISING OUT OF OR RELATED TO THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN
THIS REPORT, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES REGARDING ACCURACY, QUALITY, CORRECTNESS, COMPLETENESS,
COMPREHENSIVENESS, SUITABILITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, NON-INFRINGEMENT, MISAPPROPRIATION, OR OTHERWISE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, LLC OR ITS
SUBSIDIARIES, AFFILIATES OR THIRD PARTY SUPPLIERS BE LIABLE TO ANYONE FOR ANY DIRECT, INCIDENTAL, INDIRECT, SPECIAL,
CONSEQUENTIAL OR OTHER DAMAGES OF ANY TYPE OR KIND (INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS, LOSS OF USE, OR LOSS OF DATA), ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT.
Any analyses, estimates, ratings, environmental risk levels, or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only an assessment performed by a qualified environmental professional can provide findings, opinions or conclusions regarding the environmental risk or conditions in, on or at any property.
C2 of 18
7536673.1 2020 = 875'
C3 of 18
7536673.1 2016 = 875'
C4 of 18
7536673.1 2012 = 875'
C5 of 18
7536673.1 2009 = 875'
C6 of 18
7536673.1 2006 = 875'
C7 of 18
7536673.1 2002 = 875'
C8 of 18
Subject boundary not shown because it
exceeds image extent or image is not
georeferenced.
7536673.1 1994 = 875'
C9 of 18
7536673.1 1981 = 875'
C10 of 18
7536673.1 1978 = 875'
C11 of 18
7536673.1 1975 = 875'
C12 of 18
7536673.1 1967 = 875'
C13 of 18
7536673.1 1960 = 875'
C14 of 18
7536673.1 1954 = 875'
C15 of 18
7536673.1 1949 = 875'
C16 of 18
7536673.1 1943 = 875'
C17 of 18
7536673.1 1938 = 875'
C18 of 18
APPENDIX D – PREVIOUS STUDIES AND PERTINENT DATA
D1 of 179
D2 of 179
D3 of 179
D4 of 179
D5 of 179
D6 of 179
D7 of 179
D8 of 179
D9 of 179
D10 of 179
D11 of 179
D12 of 179
D13 of 179
D14 of 179
D15 of 179
D16 of 179
D17 of 179
D18 of 179
D19 of 179
D20 of 179
D21 of 179
D22 of 179
D23 of 179
D24 of 179
D25 of 179
D26 of 179
D27 of 179
D28 of 179
D29 of 179
D30 of 179
D31 of 179
D32 of 179
D33 of 179
D34 of 179
D35 of 179
D36 of 179
D37 of 179
D38 of 179
D39 of 179
D40 of 179
D41 of 179
D42 of 179
D43 of 179
D44 of 179
D45 of 179
`
D46 of 179
`
D47 of 179
`
D48 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3045.053
Carollo Engineers
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:00 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D49 of 179
5 Poorly-graded SAND (SP): dense, brown, moist
Silty SAND (SM): medium dense, brown, moist
SILT (ML): medium stiff, brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
Poorly-graded SAND with gravel (SP): loose, brown,
moist, approximate 10" thick layer of well graded
sand with gravel (SW) in bottom of sampler
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 11 3
4 6
4 3
1 2
8 ALLUVIUM (Qal)
Silty SAND (SM): loose, light brown, moist, organics,
roots
93 (15)
20 (41)
7 (19)
35 97
106
110
103
(15)
94 4
94 9
100
106
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
A
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf B
5 6
7 8
9 p 2.0
SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-2a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D50 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
PLATE A-2b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
5 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- medium dense, light brown, increase in grain size
- dense, decrease in grain size
(44) 103
39 10
11 SAMPLERS
LIQUID
LIMIT, %
108
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D51 of 179
108
108
37 1 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a A
3 4
5 6
SAMPLERS
3 18
7 8
ALLUVIUM (Qal)
Silty SAND (SM): medium dense, brown, dry to moist
- moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT (ML): medium stiff, brown, moist, orange
staining, gray mottling
- soft, with 4-inch layer of sandy silt (ML), wet
Poorly-graded SAND (SP): medium dense, brown,
moist
114
2 111
92 102
(29)
10 (9)
3 (38)
- dense
BACKFILLED WITH: Cuttings
% PASSING
#200 SIEVE
LIQUID
LIMIT, %
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
UNIT WET
WEIGHT, pcf
MATERIAL DESCRIPTION
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
LOG OF BORING NO. B-2
DRILLING DATE: August 31, 2006
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 25.5 ft
Carollo Engineers
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-3
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
UNIT DRY
WEIGHT, pcf
Project No. 3045.053
SAMPLER
BLOW COUNT
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
SAMPLE NO.
Approximately 25' east of access road in
field west of Black Rd. Proposed primary
trickling filter.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
D52 of 179
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a - medium dense
Poorly-graded SAND (SP): very dense, light brown,
moist
- firmer drilling starting at approximately 32'
- SILT (ML) layer 2' thick
- brown
Poorly-graded SAND with silt (SP-SM): medium
dense, light brown, moist
Clayey SILT (ML): soft, brown, moist
- wet zone of soil between 15' and 17'
3 1
5 8
35 30
4 Clayey SAND (SC): loose, brown, moist
4 25
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
SILT (ML): medium stiff, brown, moist
29 107
6 (13)
(10)
101
103
29 (82)
18 (19)
116
79 3
97 112
5 95
ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 51.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
BACKFILLED WITH: Cuttings
2SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: August 31, 2006 SAMPLER BLOW COUNT
UNIT WET
WEIGHT, pcf
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-3
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
7 MATERIAL DESCRIPTION
SAMPLERS
9 D
6 C
5 4
B
8 172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
LIQUID
LIMIT, %
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
UNIT DRY
WEIGHT, pcf
A
PLATE A-4a
DEPTH TO WATER: Wet soil noted DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
D53 of 179
DEPTH TO WATER: Wet soil noted
MATERIAL DESCRIPTION
PLASTICITY
DEPTH, ft
INDEX, %
11 PLATE A-4b
6 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
UNDRAINED SHEAR
STRENGTH, Su, ksf
98 Silty SAND (SM): medium dense, light brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
93 22
SAMPLERS
10 (30)
LIQUID
LIMIT, %
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
UNIT DRY
WEIGHT, pcf
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
% PASSING
#200 SIEVE
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-3
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
SAMPLE NO.
130
128
126
124
122
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: August 31, 2006 ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft MATERIAL SYMBOL
D54 of 179
6 Poorly-graded SAND (SP) medium dense, brown,
moist
Silty SAND (SM): medium dense, brown, moist, fine
Poorly-graded SAND (SP): medium dense, brown,
moist
- brown, moist occasional orange staining, sandy
SILT (ML) layer approximately 3" thick in top of
sampler
- medium dense, light brown
- very loose
ALLUVIUM (Qal)
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
ARTIFICIAL FILL (af)
3" asphalt concrete over 3" aggregate base
2 5
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
9 6
8 5
1 A
2 104
(1)
13 (41)
26 (16)
28 (69)
117
103
108
113
- dense
100
98 111
4 (26)
3 MATERIAL
SYMBOL
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 40.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-4
Southwest corner of Plant. Proposed
percolation pond pump station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. PLASTICITY INDEX, % B
DEPTH, ft
DEPTH TO WATER: Not Encountered
PLATE A-5
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT WET
WEIGHT, pcf
D55 of 179
ALLUVIUM (Qal)
Poorly-graded SAND (SP): medium dense, brown,
moist, occasional gravel rounded (1/8" max)
(26)
- medium dense, light brown
Poorly graded SAND (SP): dense, brown, moist
Poorly-graded SAND with silt (SP-SM) medium dense,
brown, moist
- 10" thick well graded SAND (SW) layer
Poorly-graded SAND with silt (SP-SM) medium dense,
light brown, moist
SILT with sand (ML): soft, brown, moist, approximately
2" of lean clay in bottom of sampler, wet zone in
middle approximately 4" of sampler
8 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a ARTIFICIAL FILL (af)
gravel and filter fabric
12 5
7 6
6 1
A
2 - loose to medium dense
19 (52)
22 116
108
108
120
22 (36)
4 4
(15)
27 115
101
102
108
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
3 SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
C
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
B
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-6a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D56 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
78 76
74 PLATE A-6b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
10 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- 2" thick interbed of Silty SAND (SM) in middle of
sampler
- dense, occasional gravel subrounded (1/4" max)
(34) 96
36 10
11 SAMPLERS
LIQUID
LIMIT, %
105
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D57 of 179
112
1 5
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
p 1.5
SAMPLERS
MATERIAL DESCRIPTION
22 21
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT with sand (ML): soft to medium stiff, brown,
moist
SILT (ML): medium stiff to stiff, brown, moist, orange
staining, gray mottling
- very soft to soft, wet
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
108
100 95
89 92
5 (11)
6 (12)
2 (16)
4 ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 26.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. 2 BACKFILLED WITH: Cuttings SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: October 20, 2006 SAMPLER BLOW COUNT
Approximately 350' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-6
SURFACE EL: 172.5 ft +/- (rel. MSL datum)
172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT DRY
WEIGHT, pcf
LIQUID
LIMIT, %
DEPTH TO WATER: Wet soil noted
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
UNIT WET
WEIGHT, pcf
PLATE A-7
D58 of 179
7 - dense
Poorly-graded SAND (SP): medium dense, light
brown, moist
- 5-inch thick layer of poorly-graded sand (SP) in
middle of sampler
- silt with sand (ML) in bottom of sampler, wet zone at
19.5'
SILT (ML): soft, brown, moist, orange staining, gray
mottling
SILT with sand (ML): medium stiff, brown, moist
- very loose
p 0.7
38 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 1 2
3 4
A
5 6
7 8
(51)
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
(12)
116
105
31 (17)
5 (5)
4 4
(7)
98 84
SAMPLERS
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 41.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: October 20, 2006
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
9 MATERIAL
SYMBOL
SURFACE EL: 172 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-7
Approximately 400' west of main entrance to
plant. Proposed clarifier at Septage
Receiving Station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
MATERIAL DESCRIPTION
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-8
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
D59 of 179
100
92 81
2 Poorly-graded SAND (SP): medium dense, brown,
moist
Well-graded SAND (SW): medium dense, brown,
moist
SILT (ML): soft, brown, moist, wet in middle 8 inches
of sampler
- increase in grain size
- medium dense
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 106
107
87 6
(42)
(9)
(27)
18 (41)
14 (13)
7 (12)
ALLUVIUM (Qal)
Silty SAND (SM): loose, dark brown, moist
19 5
Sandy SILT (ML): medium stiff, brown, moist
13 12
11 10
9 8
SAMPLERS
6 4
3 2
1 7
7 DEPTH TO WATER: Wet soil noted
ARTIFICIAL FILL (af)
gravel and filter fabric
11 6
12 16
Silty CLAY (CL-ML): very soft to soft, brown, moist, 29 p 0.5 orange staining
DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
MATERIAL DESCRIPTION
7 PLATE A-9
WATER
ELEVATION, ft
CONTENT, %
MATERIAL
SYMBOL
COMPLETION DEPTH: 41.0 ft
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT DRY
LIQUID
LIMIT, %
WEIGHT, pcf
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
LOG OF BORING NO. B-8
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
LOCATION: Approximately 600' west of Black Road.
Proposed Primary Trickling Filter.
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: October 20, 2006
% PASSING
#200 SIEVE
SAMPLE NO.
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
D60 of 179
100 10 1 0.1 0.01 0.001
50 100
90 80
60 40
30 20
10 0
70 4
4.1 2.7
1.5 1.5
Cc Cu
(depth,ft)
1.53 3/4 3/8 40 100
CLASSIFICATION
US STD SIEVE SIZE
19.0 4.0
4.0 NUMBERS
US STD SIEVE SIZE
INCHES
(location)
B-5
B-3
B-2
Poorly-graded SAND with silt (SP-SM)
Silty SAND (SM)
Poorly-graded SAND with silt (SP-SM)
200
SILT or CLAY
SAND
GRAIN SIZE CURVES
10 LEGEND
20 HYDROMETER ANALYSIS
GRAIN SIZE CURVES VENTURA (F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ) 10/11/06 01:03 p-sz Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
PLATE B-1
GRAVEL
GRAIN SIZE IN MILLIMETERS
Coarse Medium Fine
PERCENT FINER BY WEIGHT
Fine Coarse
Project No. 3045.053
D61 of 179
010 20 30 40 50 60 70 80 90 100
20 10
30 40
50 60
70 80
90 100
0 LIMIT(LL)
PLASTIC
LIMIT(PL)
Clayey SILT (ML)
Silty CLAY (CL-ML)
depth, ft
ATTERBERG LIMITS TEST RESULTS
PLASTICITY INDEX (PI)
INDEX (PI)
CL-ML
LIQUID LIMIT (LL)
PLASTICITY CHART
PLATE B-2
25 22
5 7
PLASTICITY CHART VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:04 a Project No. 3045.053
Carollo Engineers
CLASSIFICATION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
19.0 4.5
B-3
LIQUID
PLASTICITY
30 29
CH or OH
CL or OL
ML or OL
MH or OH
LEGEND
location
B-8
D62 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 35
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
3 94
Remold
MATERIAL DESCRIPTION
B-1
6 DIRECT SHEAR TEST RESULTS
PLATE B-3a
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D63 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 33
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
8 100
Ring Sample
MATERIAL DESCRIPTION
B-4
19 DIRECT SHEAR TEST RESULTS
PLATE B-3b
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D64 of 179
OPTIMUM WATER
CONTENT, %
MOISTURE CONTENT, %
UNIT DRY WEIGHT, pcf
LEGEND MAXIMUM UNIT
DRY WEIGHT, pcf
Test Method: ASTM D1557
25 COMPACTION TEST RESULTS
(location)
Poorly-graded SAND with silt (SP-SM)
135
100
105
110
115
120
5 10 15 20
125
130
0 CLASSIFICATION
116.0
PLATE B-4
depth, ft
B-1
COMPACTION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 09:42 a Project No. 3045.053
Carollo Engineers
6.0 ZERO AIR VOIDS CURVES
11.0 Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
(Gs = 2.65 to 2.75)
D65 of 179
SAMPLE CONDITION
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
Project No. 3045.053
B-2
92 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
9 PLATE B-5a
CONSOLIDATION TEST RESULTS
Poorly-graded SAND with silt (SP-SM)
18 Carollo Engineers
8 10
12 14
16 18
20 CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p 2 0.1 1 10
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
6 4
0 100
D66 of 179
16 18
20 10
14 12
0 2
4 6
8 0.1
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
PLATE B-5b
1 10 100
MATERIAL DESCRIPTION
DEPTH, ft
Clayey SAND (SC)
INITIAL MOISTURE CONTENT, %
CONSOLIDATION TEST RESULTS
35 B-3
SAMPLE CONDITION
79 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
14 LOCATION
D67 of 179
16 18
20 MATERIAL DESCRIPTION
10 0.1 1 10 100
14 12
0 2
4 6
8 38
DEPTH, ft
LOCATION
Project No. 3045.053
B-7
SAMPLE CONDITION
84 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
19.5 PLATE B-5c
CONSOLIDATION TEST RESULTS
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
INITIAL MOISTURE CONTENT, %
SILT (ML)
D68 of 179
14 16
18 20
8 0.1 1 10 100
12 10
0 2
4 6
UNIT DRY WEIGHT, pcf
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
16 B-8
SAMPLE CONDITION
92 STRAIN, %
7 PLATE B-5d
CONSOLIDATION TEST RESULTS
Sandy SILT (ML)
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
VERTICAL EFFECTIVE PRESSURE, ksf
WATER ADDED
D69 of 179
Carollo Engineers
Project No. 3045.053
SAND EQUIVALENT TEST RESULTS
Santa Maria Wastewater Treatment Plant Upgrades-Phase II Santa Maria, California
PLATE B-6
SAND EQUIVALENT TEST RESULTS
Sample
Number
Depth
(ft)
Clay Readings
(inches)
Sand Readings
(inches)
Sand
Equivalent
(SE)
Soil Type
B-1 9 5.5 3.4 62 Poorly-graded SAND
with silt (SP-SM)
B-5 4 9.0 2.7 30 Poorly-graded SAND
(SP)
B-6 4 5.3 2.9 55 Poorly-graded SAND
with silt (SP-SM)
Test Method: ASTM D2419
D70 of 179
D71 of 179
D72 of 179
D73 of 179
D74 of 179
D75 of 179
D76 of 179
D77 of 179
D78 of 179
D79 of 179
D80 of 179
D81 of 179
D82 of 179
D83 of 179
D84 of 179
D85 of 179
D86 of 179
D87 of 179
D88 of 179
D89 of 179
D90 of 179
D91 of 179
D92 of 179
D93 of 179
D94 of 179
D95 of 179
D96 of 179
D97 of 179
D98 of 179
D99 of 179
D100 of 179
!
"
# $ %
! " # $
% " %" & ' ( %
+ , -
. , -
-
+
/
0 .
1 2
2 3
1 .
3 3 , 1
, -
0 , -
0 , 1
. , 1
0 , -
. , -
+ , -
0 , -
+ , -
0 , -
. , -
1 , -
. , -
1 , -
/ , -
. , 1
/ , -
. , -
1 , -
0 , 1
/ , -
0 , -
/ , -
0 , -
+ , -
0 , 1
( 4
A #
3 3
4 5 :
3 3
4 )
3 9
>
?
3 3
4 )
3 9 ,
: @ >
?
+ , -
.
. , -
: @
5 )
3 9 ,
@ =
D101 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3019.008
City of Santa Maria
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/27/08 02:56 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D102 of 179
10 LIMIT, %
CONTENT, %
DEPTH, ft
8 % PASSING
PLATE A-2
UNIT DRY
WEIGHT, pcf
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, reddish brown to
greenish brown, moist
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, trace fine rounded gravel
UNIT WET
WEIGHT, pcf
LIQUID
INDEX, %
SAMPLE NO.
WATER
COMPLETION DEPTH: 7.0 ft ELEVATION, +/- MSL ELEVATION, ft
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 DEPTH TO WATER: 5.5 ft
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Qa2
Project No. 3019.008
2 143
6 4
Disturbed Soils
141SYMBOL
145
147
149
151
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
PLASTICITY
0 Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, moist to wet, water perched at base of unit, strong organic odor
TD = 7.0 ft
MATERIAL
#200 SIEVE
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: East Side of Perc Pond No. 1
EXCAVATION METHOD: Backhoe
DEPTH, ft
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
Black Sand
CONTRACTOR: City of Santa Maria
LOG OF TEST HOLE NO. T-1
CHECKED BY: J Blanchard
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
150
148
146
144
142
140
138
BLOWCOUNT
D103 of 179
EXCAVATION DATE: June 2, 2008
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-2
150
148
146
144
142
140
138
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
0 Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
2 PLATE A-3
UNIT WET
WEIGHT, pcf
ELEVATION, +/- MSL
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 2.5 ft
LIQUID
DEPTH TO WATER: Not Encountered
Black Sand
DEPTH, ft
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-2
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. 145 6
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Project No. 3019.008
City of Santa Maria
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 151
147
149
8 4
TD = 2.0 ft
Disturbed Soils
141
143
10 D104 of 179
0 EXCAVATION DATE: June 2, 2008
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SAMPLES
SAMPLER
2 4
6 8
10 Black Sand
SYMBOL
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
150
148
146
144
142
140
138
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p ELEVATION, +/- MSL SAMPLE NO. 2 4
6 8
10 12
14 COMPLETION DEPTH: 3.0 ft
TD = 3.0 ft
151
149
147
145
143
141
INDEX, %
LIQUID
PLATE A-4
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-3
UNIT WET
WEIGHT, pcf
DEPTH TO WATER: Not Encountered
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-3
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Disturbed Soils
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
DEPTH, ft
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
D105 of 179
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft ELEVATION, ft
UNIT DRY
INDEX, %
WEIGHT, pcf
WATER
PLASTICITY
ELEVATION, +/- MSL
LIMIT, %
% PASSING
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, greenish brown, moist, fissured
SAMPLE NO.
PLATE A-5
UNIT WET
WEIGHT, pcf
LIQUID
2 10
1 ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): light gray to dark gray, wet
Disturbed Soils
Poorly-graded SAND with silt (SP-SM): loose to medium
dense, greenish brown, moist, trace fine rounded gravel 149
ALLUVIUM (Qa1)
Poorly-graded SAND with silt (SP-SM): medium dense,
reddish brown to greenish brown, moist to wet, water
perched at base of unit, oxidation mottling, lenses of Oil SAND
TD = 9.0 ft
Qa3
Qa2
Qa1
8 151
141
143
145
147
CONTENT, %
Disturbed Soils
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-4
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: 4.0 ft
#200 SIEVE
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
EXCAVATION DATE: June 2, 2008 SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
DEPTH, ft
LOGGED BY: GD Eckrich
SAMPLES
150
148
146
144
142
140
138
LOG OF TEST HOLE NO. T-4
CHECKED BY: J Blanchard DEPTH, ft
BLOWCOUNT
MATERIAL
10 8
6 4
2 0
SYMBOL
D106 of 179
PLATE A-6
SAMPLES
UNIT WET
WEIGHT, pcf
CONTENT, %
% PASSING
LIQUID
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 8.0 ft
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
122
EXCAVATION METHOD: Backhoe
LOGGED BY: GD Eckrich
150
148
146
144
142
140
138
LOG OF TEST HOLE NO. T-5
#200 SIEVE
PLASTICITY
LIMIT, %
EXCAVATION DATE: June 2, 2008
ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): medium dense,
dark gray, wet
Lean CLAY (CL): soft, grayish brown, wet
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown to strong brown, wet
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, trace fine rounded gravel
1 ALLUVIUM (Qa1)
Poorly-graded SAND with gravel (SP): moist to wet, water perched at base of unit, occasional rounded to
subrounded gravel
CONTRACTOR: City of Santa Maria
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
14107 1
2 WATER
City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 149
CHECKED BY: J Blanchard
SAMPLER
TD = 8.0 ft
Qa3
Qa2
Qa2
Qa1
Disturbed Soils
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 151
141
143
145
147
6 DEPTH, ft
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. 8 4
2 0
SYMBOL
DEPTH, ft
MATERIAL
10 TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-5
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: 3.5 ft
D107 of 179
LIQUID
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST HOLE NO. T-6
150
148
146
144
142
140
138
PLATE A-7
SYMBOL
CHECKED BY: J Blanchard
DEPTH, ft
SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
#200 SIEVE
EXCAVATION METHOD: Backhoe INDEX, %
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
CONTRACTOR: City of Santa Maria
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown, moist, fissured, abundant black mottling
UNIT WET
WEIGHT, pcf
Fat CLAY (CH): soft, greenish brown, moist
ALLUVIUM (Qa1)
Poorly-graded SAND with silt (SP-SM): light to dark reddish brown, moist
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist
ALLUVIUM (Qa3)
Silty Fine SAND (SM): dark gray, moist
ELEVATION, +/- MSL
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 8.0 ft MATERIAL ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
WATER
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 149
147
SAMPLER
Disturbed Soils
TD = 8.0 ft
Qa3
Qa2
Qa2
151
141
143
145
Qa1
DEPTH, ft
10 8
6 4
2 0
LOCATION: West Side of Perc Pond No. 1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
SURFACE EL: 151.0 ft +/- (rel. datum)
DEPTH TO WATER: Not Encountered
LOG OF TEST PIT NO. T-6
D108 of 179
CONTENT, %
% PASSING
DEPTH, ft
UNIT WET
WEIGHT, pcf
#200 SIEVE
LIQUID
INDEX, %
SAMPLE NO.
EXCAVATION DATE: June 2, 2008 SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe LIMIT, %
LOGGED BY: GD Eckrich PLASTICITY
148
146
144
142
140
138
136
LOG OF TEST HOLE NO. T-7
CHECKED BY: J Blanchard
ALLUVIUM (Qa1)
Silty SAND (SM): black, moist
2 4
6 8
10 12
14 ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): dark gray to black, moist, organic odor
1 ALLUVIUM (Qa2)
Fat CLAY (CH): stiff, reddish brown, moist, fissured, black mottling, occasional white chert clasts
2 Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist
Lean CLAY (CL): soft, greenish brown, moist
UNIT DRY
WEIGHT, pcf
SAMPLES
ELEVATION, +/- MSL
ELEVATION, ft
COMPLETION DEPTH: 15.0 ft
WATER
7 8
MATERIAL DESCRIPTION
PLATE A-8
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 4 BLOWCOUNT
MATERIAL
Disturbed Soils
TD = 15.0 ft
Qa3
Qa2
City of Santa Maria
Qa1
150
130
134
138
142
Qa2
DEPTH, ft
0 SYMBOL
LOCATION: West Side of Perc Pond No. 1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-7
SURFACE EL: 150.0 ft +/- (rel. datum)
DEPTH TO WATER: Not Encountered
146
8 12
16 20
D109 of 179
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 140
142
144
146
Disturbed Soils
Clayey SAND (SC): reddish brown, wet, occasional
rounded gravels, pockets of gray SAND with Silt (SP-SM) at base of unit
150
ALLUVIUM (Qa2)
Fat CLAY (CH): reddish brown, moist, fissured, oxidation mottling, occasional white chert clasts
City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 148
UNIT DRY
WEIGHT, pcf
Qa2
Qa2
ALLUVIUM (Qa3)
Silty Fine SAND (SM): gray to black, moist to wet
Fat CLAY (CH): stiff to very stiff, reddish brown, moist Lean CLAY (CL): soft, greenish brown, moist
1 Qa3
TD = 8.0 ft
Qa2
Disturbed Soils
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
WATER
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-8
SURFACE EL: 150.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: Not Encountered SAMPLER
6 4
2 0
SYMBOL
LOGGED BY: GD Eckrich
DEPTH, ft
SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
EXCAVATION METHOD: Backhoe
MATERIAL DESCRIPTION
MATERIAL
8 10
DEPTH, ft
CHECKED BY: J Blanchard LIQUID
EXCAVATION DATE: June 2, 2008 ELEVATION, +/- MSL
CONTRACTOR: City of Santa Maria
PLATE A-9
COMPLETION DEPTH: 8.0 ft ELEVATION, ft
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 UNIT WET
WEIGHT, pcf
LIMIT, %
148
146
144
142
140
138
136
LOG OF TEST HOLE NO. T-8
CONTENT, %
% PASSING
#200 SIEVE
PLASTICITY
D110 of 179
LIQUID
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST HOLE NO. T-9
140
PLATE A-10
ALLUVIUM (Qa1)
Poorly-graded SAND (SP): loose, light brown, moist, little to some rounded fine to coarse gravel, trace silt
148
146
144
142
140
138
136
#200 SIEVE
INDEX, %
Qa3
Qa2
Qa1
Disturbed Soils
TD = 8.0 ft
ALLUVIUM (Qa3)
Silty Fine SAND (SM): loose to medium dense, gray to
black, moist, trace Hydrogen Sulfide odor
UNIT WET
WEIGHT, pcf
1 WATER
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown, moist Disturbed Soils
Clayey SAND (SC): light brown to greenish brown, moist to wet
4 SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 8.0 ft
102
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-9
SURFACE EL: 150.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
EXCAVATION DATE: June 2, 2008
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Project No. 3019.008
106
142
144
146
148
150
City of Santa Maria
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California SAMPLES 2 DEPTH TO WATER: Not Encountered SYMBOL MATERIAL
6 SAMPLER
4 UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
CHECKED BY: J Blanchard
LOGGED BY: GD Eckrich
DEPTH, ft
0 8
DEPTH, ft
10 D111 of 179
DEPTH TO WATER: 4.0 ft
DEPTH, ft
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-10
SURFACE EL: 148.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
10 % PASSING
146
144
142
140
138
136
134
LOG OF TEST HOLE NO. T-10
#200 SIEVE
LIMIT, %
LOGGED BY: GD Eckrich
CONTENT, %
PLASTICITY
SAMPLER
8 6
4 2
0 DEPTH, ft
SYMBOL
EXCAVATION DATE: June 2, 2008 SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
CHECKED BY: J Blanchard
MATERIAL
COMPLETION DEPTH: 6.0 ft ELEVATION, +/- MSL
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
WATER
1 ELEVATION, ft
Disturbed Soils
PLATE A-11
UNIT WET
WEIGHT, pcf
LIQUID
2 4
6 8
10 12
14 SAMPLE NO.
ALLUVIUM (Qa3)
Silty SAND (SM): dark gray to black, moist, Hydrogen
Sulfide odor
Disturbed Soils
Clayey SAND (SC): light brown to greenish brown, moist
SAND with silt (SP-SM): medium dense, reddish brown,
moist
ALLUVIUM (Qa1)
Poorly-graded SAND with gravel (SP): loose, gray to black, moist to wet, water perched at base of unit, rounded
gravel, Hydrogen Sulfide odor
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown, moist, fissured
INDEX, %
144
Qa3
Qa2
Qa1
Disturbed Soils
138
142
146
148
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 140
TD = 6.0 ft
1 D112 of 179
MATERIAL
8 6
4 2
0 EXCAVATION METHOD: Backhoe
DEPTH, ft
SYMBOL
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
LIMIT, %
10 DEPTH, ft
CHECKED BY: J Blanchard
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 6.0 ft
CONTRACTOR: City of Santa Maria
UNIT WET
WEIGHT, pcf
ELEVATION, +/- MSL
ELEVATION, ft
#200 SIEVE
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
INDEX, %
LOG OF TEST HOLE NO. T-11
LIQUID
PLASTICITY
PLATE A-12
146
144
142
140
138
136
134
1 UNIT DRY
WEIGHT, pcf
WATER
146
ALLUVIUM (Qa3)
SAND with silt (SP-SM): medium dense, gray to black,
moist
ALLUVIUM (Qa2)
Fat CLAY (CH): stiff to very stiff, reddish brown, moist, fissured, occasional white chert clasts
CONTENT, %
% PASSING
MATERIAL DESCRIPTION
148
138
140
142
144
Disturbed Soils
Sandy SILT (ML): stiff, greenish brown, moist to wet, water perched at base of unit
TD = 6.0 ft
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-11
SURFACE EL: 148.0 ft +/- (rel. datum)
LOCATION: West Side of Perc Pond No. 1
DEPTH TO WATER: 4.0 ft
Project No. 3019.008
Qa3
Qa2
Disturbed Soils
City of Santa Maria
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California D113 of 179
TD = 9.0 ft
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p LOG OF TEST PIT NO. T-12
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: Middle of Perc Pond No. 1
DEPTH TO WATER: 3.5 ft
145
Qa2
Qa1
Disturbed Soils
143
147
149
151
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
141
Disturbed Soils
Silty SAND (SM): medium dense, light brown to greenish
brown, moist
Lean CLAY (CL): soft, grayish brown, moist
WATER
ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): medium dense to
dense, yellowish brown, wet
ALLUVIUM (Qa1)
Poorly-graded SAND with silt and gravel (SP-SM): gray to light brown, wet, water perched at base of unit, rounded gravel
Qa3
ALLUVIUM (Qa2)
Fat CLAY (CH): very stiff to hard, reddish brown, moist, fissured, oxidation mottling
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
DEPTH, ft
8 6
4 2
0 CHECKED BY: J Blanchard
MATERIAL
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
Qa2
CONTRACTOR: City of Santa Maria
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
10 DEPTH, ft
EXCAVATION METHOD: Backhoe INDEX, %
LOGGED BY: GD Eckrich
BLOWCOUNT
PLATE A-13 LIQUID
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft
UNIT WET
WEIGHT, pcf
LOG OF TEST HOLE NO. T-12
EXCAVATION DATE: June 2, 2008
150
148
146
144
142
140
138
#200 SIEVE
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
D114 of 179
TD = 9.0 ft
LOGGED BY: GD Eckrich
PLATE A-14
WATER
5 PLASTICITY
EXCAVATION DATE: June 2, 2008
Qa1
150
148
146
144
142
140
138
#200 SIEVE
1 LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST HOLE NO. T-13
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
Disturbed Soils
Silty SAND (SM): medium dense, light brown to greenish
brown, moist
ALLUVIUM (Qa1)
Poorly-graded SAND with silt and gravel (SP-SM): medium dense, black to gray to light brown, moist to wet, water perched at base of unit, lenses of clean sand and silt, oxidation mottling, rounded to subrounded gravel, trace organic odor at base of unit
UNIT WET
WEIGHT, pcf
ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): medium dense,
grayish black, wet
Qa3
LIQUID
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft
2 ALLUVIUM (Qa2)
Fat CLAY (CH): stiff, reddish brown, moist, fissured,
oxidation staining, gray staining along fissures,
consistency becomes soft at base of unit
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
LOG OF TEST PIT NO. T-13
CHECKED BY: J Blanchard
LOCATION: Middle of Perc Pond No. 1
DEPTH TO WATER: 4.0 ft
151
Qa2
Disturbed Soils
141
143
145
149
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p SURFACE EL: 151.0 ft +/- (rel. datum)
147
DEPTH, ft
8 4
TEST PIT GRAPHICAL REPRESENTATION
0 10
MATERIAL
6 SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
SYMBOL
2 DEPTH, ft
D115 of 179
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST PIT NO. T-14
PLATE A-15
UNIT WET
WEIGHT, pcf
Qa2
LOCATION: Middle of Perc Pond No. 1
#200 SIEVE
LOG OF TEST HOLE NO. T-14
Sandy SILT (ML): grayish brown, moist, black staining,
trace organic odor
LIQUID
1 62
ALLUVIUM (Qa3)
Silty SAND (SM): yellowish brown to grayish brown, moist ALLUVIUM (Qa2)
Fat CLAY (CH): reddish brown, moist, oxidation mottling Disturbed Soils
Silty SAND (SM): medium dense, light brown to grayish
brown, moist
ELEVATION, +/- MSL
SURFACE EL: 148.0 ft +/- (rel. datum)
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 7.0 ft
INDEX, %
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
WATER
EXCAVATION DATE: June 2, 2008 SAMPLES
UNDRAINED
SHEAR
STRENGTH,Su, ksf
BLOWCOUNT
CONTRACTOR: City of Santa Maria
EXCAVATION METHOD: Backhoe
DEPTH, ft
LOGGED BY: GD Eckrich
MATERIAL
DEPTH TO WATER: Not Encountered
TEST PIT GRAPHICAL REPRESENTATION
CHECKED BY: J Blanchard
8 DEPTH, ft
SAMPLER
10 146
144
142
140
138
136
134
6 4
2 0
SYMBOL
TD = 7.0 ft
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Disturbed Soils
Qa2
Qa3
Project No. 3019.008
138
140
142
144
146
148
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
D116 of 179
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p 141
143
145
147
149
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California
MATERIAL DESCRIPTION
Project No. 3019.008
City of Santa Maria
UNIT DRY
WEIGHT, pcf
Qa2
151
TD = 7.5 ft
Qa3
Qa2
Qa2
Disturbed Soils
ALLUVIUM (Qa2)
Sandy SILT (ML): stiff, grayish brown, moist, oxidation staining, fissured
ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): medium dense to
dense, light yellowish brown, moist
1 Silty CLAY (CL-ML): grayish brown, moist, abundant black staining, organic odor
2 Disturbed Soils
Sandy Lean CLAY (CL): stiff, light brown, moist, occasional rounded gravel
Fat CLAY (CH): reddish brown, moist, fissured
LOG OF TEST PIT NO. T-15
WATER
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: Middle of Perc Pond No. 1
DEPTH TO WATER: Not Encountered
63 MATERIAL
10 8
6 4
2 0
EXCAVATION METHOD: Backhoe
DEPTH, ft
SYMBOL
SAMPLES
ELEVATION, ft
BLOWCOUNT
CONTRACTOR: City of Santa Maria DEPTH, ft UNDRAINED SHEAR STRENGTH,Su, ksf
SAMPLE NO.
CHECKED BY: J Blanchard
PLATE A-16
SAMPLER
LIQUID
2 4
6 8
10 12
14 COMPLETION DEPTH: 7.5 ft ELEVATION, +/- MSL
INDEX, %
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
UNIT WET
WEIGHT, pcf
150
148
146
144
142
140
138
#200 SIEVE
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
LOG OF TEST HOLE NO. T-15
D117 of 179
97.0 92.4 5.0
ALLUVIUM (Qa3)
Poorly-graded SAND (SP): light yellowish brown, moist
LOCATION: East Side of Perc Pond No. 1
DEPTH TO WATER: Not Encountered
City of Santa Maria
2 Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California Lean CLAY (CL): soft, grayish brown, moist, fissured
Fat CLAY (CH): stiff to very stiff, reddish brown, moist, fissured
ALLUVIUM (Qa2)
SILT (ML): gray to black, moist, Hydrogen Sulfide odor
Disturbed Soils
Clayey SAND (SC): light brown to grayish brown, moist
TD = 9.0 ft
Qa3
Qa2
Qa2
Qa2
152
142
144
146
148
150
Disturbed Soils
DEPTH, ft
10 8
6 4
2 0
EXCAVATION METHOD: Backhoe
SYMBOL
DEPTH, ft
MATERIAL
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
1 CONTRACTOR: City of Santa Maria
TEST PIT GRAPHICAL REPRESENTATION
CHECKED BY: J Blanchard
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008 BLOWCOUNT
Project No. 3019.008
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p SURFACE EL: 152.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-16
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. #200 SIEVE
LIQUID
150
148
146
144
142
140
138
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft
LOG OF TEST HOLE NO. T-16
UNIT WET
WEIGHT, pcf
ELEVATION, +/- MSL
ELEVATION, ft
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
WATER
PLASTICITY
LIMIT, %
CONTENT, %
% PASSING
PLATE A-17
D118 of 179
8.0 T-14 4.0 1 SILT (ML) 62
2 5
2 T-13
T-10 2.5 1 Poorly-graded SAND (SP) 1
Poorly-graded SAND with silt (SP-SM)
92 T-4
SAMPLE NUMBER
4.2E-2
T-15
5 3.0
T-16 8.5 1 Poorly-graded SAND (SP) 97
SILT (ML) 63
1 2
Poorly-graded SAND with silt (SP-SM)
T-57.6 2.0 1 Poorly-graded SAND (SP) 14107122
7.6E-3
8.1E-2
10 2.7E-2
T-4 7.5 2
0.0 1 Poorly-graded SAND with silt (SP-SM) 8
2 T-9 2.0 1 Poorly-graded SAND (SP) 102106 4
1 T-7 14.5 Poorly-graded SAND with silt (SP-SM)
T-7 7.5 1 Poorly-graded SAND with silt (SP-SM) 8
7 MAX
DD
pcf
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California ATTERBERG FINES
LIMITS
%
LAB SUMMARY TABLE VENTURA_F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ_ 7/3/08 10:14 AM-cab DEPTH, ft
Project No. 3019.008
Permeability, cm/s
PLATE B-1
CORROSIVITY TESTS
R pH
DRILLDIRECT
SHEAR
HOLE
OPT
MC
%
UWW
pcf
LL Cl
EXPANSION INDEX
UDW
pcf
MC
%
PI C
ksf
Qu,
ksf
COMPACTION
TEST
MATERIAL DESCRIPTION
SU
(Cell Prs.)
ksf
So4
(%)
SUMMARY OF LABORATORY TEST RESULTS
PHI
deg
SAND EQUIVALENT
(SE)
COMPRESSIVE
STRENGTH
TESTS
R-VALUE
City of Santa Maria
D120 of 179
20 10
0 40
50 1 0.1 0.01 0.001
7.5 2.0
8.0 30
100
90 80
70 60
8.5 2.0
GRAIN SIZE IN MILLIMETERS
Coarse Medium Fine
PERCENT FINER BY WEIGHT
Fine Coarse
CLASSIFICATION
PLATE B-2
SILT or CLAY
SAND
10 1.53 3/4 3/8 40 100
GRAVEL
GRAIN SIZE CURVES
10 LEGEND
20 HYDROMETER ANALYSIS
GRAIN SIZE CURVES VENTURA (F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ) 7/2/08 05:00 p-sz Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
Cc
(location)
Poorly-graded SAND with silt (SP-SM)
Poorly-graded SAND (SP)
Poorly-graded SAND with silt (SP-SM)
Poorly-graded SAND (SP)
T-4
T-5
T-7
T-9
(depth,ft)
T-16
US STD SIEVE SIZE
INCHES
200
US STD SIEVE SIZE
NUMBERS
7.5 4
T-13
4.6 Cu
1.6 0.9
1.4 0.8
1.2 1.2
5.6 Poorly-graded SAND (SP)
5.7 Poorly-graded SAND with silt (SP-SM)
3.2 2.4
100
3.0 D121 of 179
TP-3L2
TP-3-2
TP-3-4
TP-3-3
TP-3-5
TP-3L1
TP-3-1
TP-3-6
TP-4-2
TP-4-1
TP-4-7
TP-4L1
TP-4-6
TP-4-5
TP-4-3
City of Santa Maria
Project No. 04.6111.0048
PLATE 2
FIELD EXPLORATION PLAN
Percolation Ponds Nos. 3 and 4
Santa Maria, California
0 400
FEET
NORTH
All locations and dimensions are approximate
D122 of 179
PLATE A-1
City of Santa Maria
Project No. 04.6111.0048
11 4
Poorly graded SAND (SP)
C
O
A
R
S
E
G
R
A
I
N
E
D
MATERIAL DESCRIPTION
Silty CLAY (CL-ML)
Silty SAND (SM)
Paving and/or Base Materials
SANDSTONE
Poorly graded GRAVEL (GP)
MUDSTONE
SYMBOL
SILTSTONE
Well graded SAND (SW)
Fat CLAY (CH)
MATERIAL
SAMPLE NO.
Hand Auger Sample
ANDESITE BRECCIA
7 9
5 Thin-walled Tube, pushed
10 Symbol for:
CA Liner Sampler, driven
Vibracore Sample
Pitcher Sample
Lexan Sample
BASALT
Sonic Soil Core Sample
No Sample Recovered
CA Liner Sampler, Bagged
13 (25)
6 CONGLOMERATE
3 F
I
N
E
G
R
A
I
N
E
D
R
O
C
K
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 25
Silty, Clayey SAND (SC-SM)
(25)
Elastic SILT (MH)
(25)
(25)
Lean CLAY (CL)
Sampler Driving Resistance
p = Pocket Penetrometer
Q = Unconfined Compression
u = Unconsolidated Undrained Triaxial
Initial or perched water level
Seepages encountered
Final ground water level
Bulk Bag Sample (from cuttings)
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
CLAYSTONE
LOCATION:
SILT (ML)
2 5
13 9
1 8
7 SAMPLES
Clayey SAND (SC)
The drill hole location referencing local
landmarks or coordinates
Well graded GRAVEL (GW)
BLOW COUNT /
t = Torvane
Blows/ft Description
25 Blow counts for California Liner Sampler
shown in ( )
Geologic Formation noted in bold font at
the top of interpreted interval
Classification of Soils per ASTM D2487
or D2488
Strength Legend
Length of sample symbol approximates
recovery length
Water Level Symbols
SURFACE EL: Using local, MSL, MLLW or other datum
KEY TO TERMS & SYMBOLS USED ON LOGS
12 m = Miniature Vane
Samplers and sampler dimensions
Soil Texture Symbol
General Notes
Sloped line in symbol column indicates
transitional boundary
(unless otherwise noted in report text) are as follows:
3 CA Liner Sampler, disturbed
11 1 SPT Sampler, driven
6 8
2 4
CME Core Sample
12 10
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/2/11 09:36 a 30"/
30"
20"/
24"
DEPTH, ft
REC"/DRIVE"
18"/
30"
20"/
24"
ELEVATION, ft
50 blows drove sampler 3" during
initial 6" seating interval
Ref/3"
50 blows drove sampler 6" after
initial 6" of seating
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50/6"
86/11"
25 blows drove sampler 12" after
initial 6" of seating
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
1-3/8" ID, 2" OD
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
2-7/8" ID, 3" OD
D124 of 179
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Santa Maria, California
LOCATION: South-central of Pond 3
DEPTH TO WATER: Not Encountered
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-1
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 14.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
1. Poorly graded SAND with silt (SP-SM): pale yellowish brown, moist, fine to medium sand
2. Lean CLAY (CL): reddish brown, moist
3. Poorly graded SAND with silt (SP-SM) to silty SAND
(SM): pale yellowish brown, fine to medium sand
PLATE A-2
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-1
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:11 a City of Santa Maria
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 Bulk sample Hand driven ring sample
D125 of 179
1. Lean CLAY (CL): reddish brown, moist, minor gravel to 3"
2. Poorly graded SAND (SP): pale yellowish brown, wet,
fine to medium sand
3 WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 14.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-3
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-2
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Northeast corner of Pond 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-2
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:31 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
Bulk sample Hand driven ring sample
D126 of 179
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, fine sand
2. Lean CLAY (CL): reddish brown, moist to wet
3. Poorly graded SAND with silt (SP-SM): pale yellowish brown
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 6.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-4
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-3
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: East side near center of Pond 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-3
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:33 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 R3
Bulk sample Hand driven ring sample
D127 of 179
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, fine sand, disturbed material
2. Lean CLAY (CL): reddish brown, pockets of black sand
3. Poorly graded SAND (SP): gray to grayish brown, fine to medium sand
3 WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 5.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-5
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-4
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Northwest quadrant of Pond 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-4
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:34 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 Bulk sample Hand driven ring sample
D128 of 179
100.4 9.2 91.9
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown
2. Lean CLAY (CL): light olive gray, moist, crumbly
3. Lean CLAY (CL): stiff to very stiff, dark yellowish brown, moist
4. Poorly graded SAND (SP): pale yellowish brown, fine to medium sand
2 WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 5.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-6
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-5
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Center of Pond 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-5
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:34 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 4
Bulk sample Hand driven ring sample
D129 of 179
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, wet, fine to medium sand, disturbed
material
2. Lean CLAY (CL): dark gray to dark yellowish brown
3. Poorly graded SAND with silt (SP-SM): pale yellowish brown, fine to medium sand
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 6.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-7
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-6
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Southwest quadrant of Pond 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-6
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:34 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 Bulk sample Hand driven ring sample
D130 of 179
1. Silty SAND (SM): grayish brown, moist, fine sand
2. - dark yellowish brown
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 6.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-8
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-L1
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Levee between Ponds 1 and 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-L1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:34 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
Bulk sample Hand driven ring sample
D131 of 179
95.7 6.3 90.0
1. Poorly graded SAND with silt (SP-SM): grayish brown, moist, fine sand
14 11
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 14.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-9
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 3-L2
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: North end of levee between Ponds 1 and 3
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 3-L2
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:37 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 Bulk sample Hand driven ring sample
D132 of 179
1. SAND with silt (SP-SM): dark yellowish brown to brownish gray, wet to moist, fine to medium pockets of sand
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 15.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-10
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-1
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Northeast quadrant of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:37 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
Bulk sample Hand driven ring sample
1 0
4 8
12 16
20 DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
D133 of 179
1. Poorly graded SAND (SP): dark gray to brownish gray, wet - stained dark gray
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 12.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-11
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-2
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Northeast corner of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-2
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:37 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 Dark gray
1 Bulk sample Hand driven ring sample
D134 of 179
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, wet, medium to coarse sand, minor
gravels
1A. Poorly graded SAND with silt (SP-SM): multicolored, coarse sand, rounded, seepage
2. Lean CLAY (CL): dark yellowish brown to moderate
yellowish brown, wet
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 6.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-12
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-3
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Southeast quadrant of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-3
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:37 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
1A
Bulk sample Hand driven ring sample
D135 of 179
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-4
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
1. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, moist, fine to medium sand, some fine
gravel, rounded
2. Poorly graded SAND (SP): moderate yellowish brown,
wet, medium sand
3. Lean CLAY (CL): reddish brown to dark yellowish brown
4. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, wet, medium sand
10 WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 11.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-13
LOCATION: South-center of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-4
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:40 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 2
4 6
8 10
DEPTH, ft
DEPTH, ft
0 2
4 6
8 10
1 2
3 4
Bulk sample Hand driven ring sample
D136 of 179
1. Poorly graded SAND (SP): moderate yellowish brown,
moist
2. Poorly graded SAND with gravel (SP): multicolored, wet, fine to coarse sand
3. Lean CLAY (CL): reddish brown, wet, 3' to 4' thick
3 1
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 15.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-14
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-5
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: South-center of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-5
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:40 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 3
6 9
12 15
DEPTH, ft
DEPTH, ft
0 3
6 9
12 15
1 2
3 Bulk sample Hand driven ring sample
D137 of 179
109.7 37.6 79.7
1. Silty SAND (SM): moderate yellowish brown, moist to
wet, fine sand
2. Sandy SILT (ML): moderate yellowish brown to
multicolored, medium to coarse sand, seeping
3. Lean CLAY (CL): moderate yellowish brown to dark
yellowish brown, wet, fine to medium sand
4. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, wet, fine to medium sand
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 13.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-15
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-6
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Center of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-6
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:43 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 4
Bulk sample Hand driven ring sample
D138 of 179
117.9 17.7 100.2
1. Silty SAND (SM): moderate yellowish brown to brownish gray, moist to wet, medium to coarse sand
2. Lean CLAY (CL): reddish brown to moderate yellowish
brown, wet
3. Poorly graded SAND with silt (SP-SM): moderate
yellowish brown, wet, fine to medium sand
9 WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 9.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-16
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-7
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: North-center of Pond 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-7
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:43 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 Bulk sample Hand driven ring sample
D139 of 179
1. Silty SAND (SM): moderate yellowish brown, dry
2. Poorly graded SAND with silt (SP-SM): dark yellowish brown, dry, fine to medium sand, fill, gravels occasionally to 3"
3. Poorly graded SAND with silt (SP-SM): pale yellowish brown, dry, fine to medium sand
8 12
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
COMPLETION DEPTH: 9.0 ft
2 4
6 8
10 12
14 SAMPLE NO.
INDEX, %
LIQUID
UNIT WET
WEIGHT, pcf
PLATE A-17
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST PIT NO. TP 4-L1
EXCAVATION DATE: June 22, 2011
LOGGED BY: T Nicely
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: Fugro Consultants
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
LOCATION: Levee between Ponds 2 and 4
DEPTH TO WATER: Not Encountered
SURFACE EL: ft +/- (rel. datum)
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. TP 4-L1
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT LOG WITH LAB SUMS VENTURA
Project No. 04.6111.0048
F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 11:44 a City of Santa Maria
Santa Maria, California
Percolation Ponds Nos. 3 and 4
0 4
8 12
16 20
DEPTH, ft
DEPTH, ft
0 4
8 12
16 20
1 2
3 Bulk sample Hand driven ring sample
D140 of 179
TP 3-1 2.0 Lean CLAY (CL) 106.6 19.6
TP 3-2 14.0 Poorly graded SAND (SP) 3TP 3-4 4.0 Poorly graded SAND (SP) 3TP 3-5 5.0 Poorly graded SAND (SP) 100 92 9 2 3.10E-3TP 3-L2 4.0 Silty SAND (SM) 96 90 6 14 6.90E-4TP 3-L2 5.0 Poorly graded SAND with silt (SP-SM) 11TP 4-2 2.5 Poorly graded SAND (SP) 103.9 17.8TP 4-4 0.0 Poorly graded SAND with silt (SP-SM) 10TP 4-5 3.0 Poorly graded SAND (SP) 3TP 4-5 5.0 Poorly graded SAND with gravel (SP) 1TP 4-6 5.0 Lean CLAY (CL) 110 80 38 7.10E-6TP 4-7 8.0 Poorly graded SAND with silt (SP-SM) 118 100 18 9 6.10E-3TP 4-L1 4.0 Poorly graded SAND with silt (SP-SM) 8TP 4-L1 5.0 Poorly graded SAND with silt (SP-SM) 12
SAMPLE NUMBER
SUMMARY OF LABORATORY TEST RESULTS
So4
(%)
LAB SUMMARY W/ HYDRAULIC CONDUCTIVITY _F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ_ 8/9/11 09:43 AM-cab FINES %
MAX
DD
pcf
ATTERBERG
LIMITS
DEPTH, ft
Percolation Ponds Nos. 3 and 4
Santa Maria, California
DRILL
HOLE
COMPACTION
TEST
SU (Cell Prs.)
ksf
Qu,
ksf
C
ksf PI
MC
%
UDW
pcf
HYDRAULIC
CONDUCTIVITY (cm/s)
SAND EQUIVALENT
(SE)
SPECIFIC GRAVITY
COMPRESSIVE
STRENGTH
TESTS
PHIdeg LL
UWW
pcf
OPT
MC
%
DIRECT
SHEAR
Cl R pH
CORROSIVITY TESTS
PLATE B-1
MATERIAL DESCRIPTION
Project No. 04.6111.0048
City of Santa Maria
D142 of 179
0 10
20 30
40 50
60 70
80 90
100
100 10 1 0.1 0.01 0.001
SAND
SILT or CLAY
Fine Coarse
PERCENT FINER BY WEIGHT
Coarse Medium Fine
GRAIN SIZE IN MILLIMETERS
GRAVEL
GRAIN SIZE CURVES
PLATE B-2
Project No. 04.6111.0048
City of Santa Maria
Percolation Ponds Nos. 3 and 4
Santa Maria, California
GRAIN SIZE CURVES VENTURA (F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ) 8/1/11 10:50 a-sz
HYDROMETER ANALYSIS
20 LEGEND
3 1.5 3/4 3/8 4 10 40 100
(depth,ft)
CLASSIFICATION Cc Cu
2.7 2.9
2.6 5.1
2.8 4.7
4.4 4.9
Poorly graded SAND (SP)
Poorly graded SAND (SP)
Poorly graded SAND (SP)
Poorly graded SAND with silt (SP-SM)
Poorly graded SAND (SP)
Poorly graded SAND with gravel (SP)
Poorly graded SAND with silt (SP-SM)
Poorly graded SAND with silt (SP-SM)
TP 3-2
TP 3-4
TP 3-5
TP 3-L2
TP 4-5
TP 4-5
TP 4-7
TP 4-L1
(location)
US STD SIEVE SIZE
INCHES
200
US STD SIEVE SIZE
NUMBERS
14.0 4.0
5.0 5.0
3.0 5.0
8.0 4.0
1.2 1.2
1.1 1.2
1.2 0.8
1.3 1.2
D143 of 179
100
105
110
115
120
125
130
135
0 5 10 15 20 25
OPTIMUM WATER
CONTENT, %
MOISTURE CONTENT, %
UNIT DRY WEIGHT, pcf
LEGEND MAXIMUM UNIT
DRY WEIGHT, pcf
Test Method: ASTM D1557
(Gs = 2.65 to 2.75)
CLASSIFICATION
106.6 19.6
depth, ft
PLATE B-3a
COMPACTION TEST RESULTS
(location)
Lean CLAY (CL)
ZERO AIR VOIDS CURVES
TP 3-1 2.0
COMPACTION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 10:44 a Project No. 04.6111.0048
City of Santa Maria
Percolation Ponds Nos. 3 and 4
Santa Maria, California
D144 of 179
100
105
110
115
120
125
130
135
0 5 10 15 20 25
OPTIMUM WATER
CONTENT, %
MOISTURE CONTENT, %
UNIT DRY WEIGHT, pcf
LEGEND MAXIMUM UNIT
DRY WEIGHT, pcf
Test Method: ASTM D1557
(Gs = 2.65 to 2.75)
CLASSIFICATION
103.9 17.8
depth, ft
PLATE B-3b
COMPACTION TEST RESULTS
(location)
Poorly graded SAND (SP)
ZERO AIR VOIDS CURVES
TP 4-2 2.5
COMPACTION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\04.6111.0048.GPJ 8/1/11 10:44 a Project No. 04.6111.0048
City of Santa Maria
Percolation Ponds Nos. 3 and 4
Santa Maria, California
D145 of 179
City of Santa Maria
Project No. 04.6111.0048
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
TP 3-5
CLASSIFICATION
Sieve Size
5.00 #4 (4.75mm)
SAMPLE PROPERTIES
Intial
% Passing Other Parameters
--- 3/8-in. (9.5mm) --- Liquid Limit ---
--- Plastic Limit ---
Poorly-graded SAND (SP): olive
brown, moist, fine sand
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.65
#
100 (0.150mm) ---
Mass, g 363.48 425.55
---
ModCal
Deaired Tap-Water
Final #200 (0.075mm)
91.9 95.1 Permeant TEST SUMMARY
Sample Type
2.93 2.42 2.41
kavg 20ºC, cm/s
Water Content, % 9.2% 27.8%
Void Ratio 0.80 0.74
Saturation, % 30% 100%
Dry Density, pcf
Area, in2
Pipette Area, cm20.971
3.1E-03
Diameter, in Tested By JC
Height, in 3.00
4.60 4.55
Volume, in313.80 13.33
REMARKS
Test Method: ASTM D5084 (Method C)
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf μ, ksf ioi
f kt
, cm/s
1 7/5/11 80 25.4 0.4 14.4 0.4 0.1 3.5E-03
2 7/5/11 77 25.4 0.4 14.4 0.4 0.1 3.6E-03
3 7/5/11 79 25.4 0.4 14.4 0.4 0.1 3.5E-03
4 7/5/11 78 25.4 0.4 14.4 0.4 0.1 3.6E-03
5 SAMPLE IMAGES
6 HYDRAULIC CONDUCTIVITY
Percolation Ponds Nos. 3 and 4
Santa Maria, California PLATE B-4a
D146 of 179
City of Santa Maria
Project No. 04.6111.0048
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
TP 3-L2
CLASSIFICATION
Sieve Size
4.00 #4 (4.75mm)
SAMPLE PROPERTIES
Intial
% Passing Other Parameters
--- 3/8-in. (9.5mm) --- Liquid Limit ---
--- Plastic Limit ---
Silty SAND (SM): yellowish brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.65
#
100 (0.150mm) ---
Mass, g 343.80 396.48
13.8 ModCal
Deaired Tap-Water
Final #200 (0.075mm)
90.0 103.3 Permeant TEST SUMMARY
Sample Type
2.83 2.41 2.32
kavg 20ºC, cm/s
Water Content, % 6.3% 22.6%
Void Ratio 0.84 0.60
Saturation, % 20% 100%
Dry Density, pcf
Area, in2
Pipette Area, cm20.971
6.9E-04
Diameter, in Tested By JC
Height, in 3.00
4.56 4.21
Volume, in313.69 11.92
REMARKS
Test Method: ASTM D5084 (Method C)
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf μ, ksf ioi
f kt
, cm/s
1 7/6/11 375 24.9 0.4 14.4 0.4 0.1 7.7E-04
2 7/6/11 377 24.8 0.4 14.4 0.4 0.1 7.7E-04
3 7/6/11 376 24.8 0.4 14.4 0.4 0.1 7.7E-04
4 7/6/11 375 24.8 0.4 14.4 0.4 0.1 7.7E-04
5 SAMPLE IMAGES
6 HYDRAULIC CONDUCTIVITY
Percolation Ponds Nos. 3 and 4
Santa Maria, California PLATE B-4b
D147 of 179
City of Santa Maria
Project No. 04.6111.0048
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
4.60 38.5%
SAMPLE ID
TP 4-6
---
5 Lean CLAY (CL): yellowish brown,
moist
1.00 4.46
4.44 100%
1.04 kt σ', ksf μ, ksf , cm/s
Permeant
Pipette Area, cm2
kavg 20ºC, cm/s
Annulus Area, cm2
TempAvg, ºC
2.6 7.8E-06
8.1E-06
7.6E-06
i
f
2.6 2.6
2.6 0.4 13.2 9.8
9.8 13.2 9.8
REMARKS
Void Ratio
Diameter, in
Tested By JC
4.60 Test Method: ASTM D5084 (Method F)
2.38 132.50
0.4 0.4 13.2 7.8E-06
Date Time, sec
SAMPLE PROPERTIES
Intial Final
Mass, g
Water Content, %
Dry Density, pcf
Saturation, %
Height, in
Area, in2
Volume, in3
37.6%
79.7 5
36 7/1/11 37
Trial
7/1/11 37
6 24.0
7/1/11
3 24.0
24.0 SAMPLE IMAGES
2 1 7/1/11 38 9.8
PERMEATION DATA
io
4 24.0
0.4 13.2
#
100 (0.150mm)
Sample Type
#
200 (0.075mm)
---
---
TEST SUMMARY
91%
1.11 2.42
1.00 ModCal
Deaired Tap-Water
0.0314
7.1E-06
0.7671
82.6 3/8-in. (9.5mm) Liquid Limit ---
---
---
2.7 Plastic Limit
Plasticity Index
133.36
CLASSIFICATION
Sieve Size % Passing Other Parameters
#
16 (1.18mm)
#
30 (0.6mm)
---
---
#
4 (4.75mm)
---
---
HYDRAULIC CONDUCTIVITY
Percolation Ponds Nos. 3 and 4
Santa Maria, California PLATE B-4c
D148 of 179
City of Santa Maria
Project No. 04.6111.0048
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
TP 4-7
CLASSIFICATION
Sieve Size
8.00 #4 (4.75mm)
SAMPLE PROPERTIES
Intial
% Passing Other Parameters
--- 3/8-in. (9.5mm) --- Liquid Limit ---
--- Plastic Limit ---
Poorly-graded SAND (SP):
yellowish brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.65
#
100 (0.150mm) ---
Mass, g 423.40 439.57
---
Remold
Deaired Tap-Water
Final #200 (0.075mm)
100.2 104.1 Permeant TEST SUMMARY
Sample Type
2.90 2.41 2.41
kavg 20ºC, cm/s
Water Content, % 17.7% 22.2%
Void Ratio 0.65 0.59
Saturation, % 72% 100%
Dry Density, pcf
Area, in2
Pipette Area, cm20.971
6.1E-03
Diameter, in Tested By JC
Height, in 3.00
4.56 4.54
Volume, in313.69 13.16
REMARKS
Test Method: ASTM D5084 (Method C)
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf μ, ksf ioi
f kt
, cm/s
1 7/5/11 38 25.9 0.4 14.4 0.4 0.1 7.3E-03
2 7/5/11 40 25.9 0.4 14.4 0.4 0.1 6.9E-03
3 7/5/11 39 25.8 0.4 14.4 0.4 0.1 7.1E-03
4 7/5/11 40 25.8 0.4 14.4 0.4 0.1 6.9E-03
5 7/5/11 40 25.7 0.4 14.4 0.4 0.1 6.9E-03
6.9E-03
SAMPLE IMAGES
6 7/5/11 40 25.7 0.4 14.4 0.4 0.1
HYDRAULIC CONDUCTIVITY
Percolation Ponds Nos. 3 and 4
Santa Maria, California PLATE B-4d
D149 of 179
summary of the test pit locations with the depth to the top of the clay layer noted is shown in Figure 3.
4.2 SUGGESTED REQUIREMENTS FOR IMPORTED SAND
Imported replacement fill materials should consist of clean sand with a sand equivalent of at least 30 and no more than 3 percent fines. All import fill materials should be reviewed by the geotechnical professional prior to use. The onsite or imported soil should be sand that is free of topsoil, organics, clay and other deleterious material.
4.3 REUSE OF EXCAVATED SOIL
The hydraulic conductivity of the excavated soil should be approximately 1x10-3 centimeters per second (cm/s) or greater (i.e., faster). Relatively high permeability sandy soil excavated from the pond should be suitable for re-use as fill in the pond bottom based on Fugro’s (2008) study and sieve analysis data collected for this study. Fugro (2008) performed hydraulic conductivity testing on alluvium with fines contents of 1, 2 and 10 percent from beneath nearby Pond No. 1.
The Fugro (2008) hydraulic conductivity test results on samples with 1- and 2-percent fines content estimated permeability rates of 8.1x10-2 cm/s and 4.2x10-2 cm/s. The result of the Fugro Figure 3: Field Exploration Plan
D150 of 179
DATE
6/8/2018
PROJECT NAME
Pond No. 12 Rehabilitation
Poorly graded SAND with SILT and GRAVEL
SANDY lean CLAY GRAVELLY lean CLAY
ORGANIC lean CLAY with SAND ORGANIC lean CLAY with GRAVEL SANDY ORGANIC lean CLAY SANDY ORGANIC lean CLAY with GRAVEL
Fat CLAY with SAND
Fat CLAY with GRAVEL SANDY fat CLAY
SANDY fat CLAY with GRAVEL GRAVELLY fat CLAY GRAVELLY fat CLAY with SAND ORGANIC fat CLAY ORGANIC fat CLAY with SAND ORGANIC fat CLAY with GRAVEL SANDY ORGANIC fat CLAY Elastic SILT with SAND
Well-graded GRAVEL
Poorly graded GRAVEL with SILT
GRAVELLY lean CLAY with SAND
Standard California Sampler (2.5" O.D.)
C Consolidation (ASTM D 2435-04)
CL Collapse Potential (ASTM D 5333-03)
CP
CR Corrosion, Sulfates, Chlorides (CTM 643 - 99;
CTM 417 - 06; CTM 422 - 06)
CU Consolidated Undrained Triaxial (ASTM D 4767-02)
Direct Shear (ASTM D 3080-04)
Expansion Index (ASTM D 4829-03)
Moisture Content (ASTM D 2216-05)
Organic Content (ASTM D 2974-07)
Permeability (CTM 220 - 05)
Particle Size Analysis (ASTM D 422-63 [2002])
Liquid Limit, Plastic Limit, Plasticity Index
(AASHTO T 89-02, AASHTO T 90-00)
PP
PM
PL
PI
PA
P
OC
M
EI
DS
SP-SC
SW
SP
Piston Sampler
SW-SM
SILTY, CLAYEY GRAVEL with SAND
CLAYEY GRAVEL with SAND
SILTY GRAVEL with SAND
Compaction Curve (ASTM D1557)
Modified California Sampler (3" O.D.)
GRAVELLY SILT with SAND
SILT
ORGANIC SILT with SAND ORGANIC SILT with GRAVEL
Standard Penetration Test (SPT) (2" O.D.)
GROUP SYMBOLS AND NAMES
DRILLING METHOD SYMBOLS
OL
CH
MH
OH
OL/OH
Rock Core Grab Sample
OL
SC
GW
GW-GM
CL
CL-ML
ML
COBBLES and BOULDERS
BOULDERS
PT
SILTY GRAVEL
CLAYEY GRAVEL
SILTY, CLAYEY GRAVEL
SILTY SAND
CLAYEY SAND
SILTY CLAY
SILTY CLAY with SAND
SILTY CLAY with GRAVEL SANDY SILTY CLAY
SANDY SILTY CLAY with GRAVEL GRAVELLY SILTY CLAY GRAVELLY SILTY CLAY with SAND SILT with SAND
SILT with GRAVEL SANDY SILT SANDY SILT with GRAVEL
SANDY ORGANIC fat CLAY with GRAVEL GRAVELLY ORGANIC fat CLAY GRAVELLY ORGANIC fat CLAY with SAND Elastic SILT
ORGANIC elastic SILT with GRAVEL SANDY elastic ELASTIC SILT SILTY, CLAYEY SAND Group Names
SC-SM
Graphic / Symbol Graphic / Symbol Group Names
GC
GP
GC-GM
SANDY ORGANIC SILT
Lean CLAY with SAND
Lean CLAY with GRAVEL SANDY lean CLAY with GRAVEL
ORGANIC lean CLAY
GRAVELLY ORGANIC lean CLAY GRAVELLY ORGANIC lean CLAY with SAND Fat CLAY
Elastic SILT with GRAVEL SANDY elastic SILT SANDY elastic SILT with GRAVEL GRAVELLY elastic SILT GRAVELLY elastic SILT with SAND ORGANIC elastic SILT
SANDY ORGANIC SILT with GRAVEL GRAVELLY ORGANIC SILT GRAVELLY ORGANIC SILT with SAND
ORGANIC SILT
Well-graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
SILTY, CLAYEY SAND with GRAVEL
CLAYEY SAND with GRAVEL
SILTY SAND with GRAVEL
COBBLES
Well-graded GRAVEL with SAND
Well-graded GRAVEL with SILT
Well-graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Well-graded SAND with CLAY (or SILTY CLAY)
Poorly graded GRAVEL
Poorly graded GRAVEL with CLAY
(or SILTY CLAY)
Poorly graded SAND with SILT
Poorly graded SAND with CLAY (or SILTY CLAY)
Poorly graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
Lean CLAY
ORGANIC elastic SILT with SAND
SANDY ORGANIC elastic SILT with GRAVEL GRAVELLY ORGANIC elastic SILT GRAVELLY ORGANIC elastic SILT with SAND GW-GC
GP-GM
GP-GC
GM
Well-graded SAND with SILT
SW-SC
SP-SM
GRAVELLY SILT
ORGANIC SOIL ORGANIC SOIL with SAND ORGANIC SOIL with GRAVEL SANDY ORGANIC SOIL SANDY ORGANIC SOIL with GRAVEL GRAVELLY ORGANIC SOIL GRAVELLY ORGANIC SOIL with SAND OH
SM
Auger Drilling
FIELD AND LABORATORY TESTS
WATER LEVEL SYMBOLS
Dynamic Cone
or Hand Driven Rotary Drilling Diamond Core
Static Water Level Reading (long-term)
Shelby Tube
Bulk Sample Other (see remarks)
Static Water Level Reading (short-term)
First Water Level Reading (during drilling)
SHEET
1 of 1
SAMPLER GRAPHIC SYMBOLS
PEAT
Well-graded GRAVEL with SILT and SAND
Well-graded GRAVEL with CLAY (or SILTY CLAY)
Well-graded SAND
Well-graded SAND with GRAVEL
Well-graded SAND with SILT and GRAVEL
Poorly graded GRAVEL with SAND
Poorly graded GRAVEL with SILT and SAND
Poorly graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Poorly graded SAND
Poorly graded SAND with GRAVEL
Point Load Index (ASTM D 5731-05)
Pressure Meter
Pocket Penetrometer
R-Value (CTM 301 - 00)
Sand Equivalent (CTM 217 - 99)
Specific Gravity (AASHTO T 100-06)
Shrinkage Limit (ASTM D 427-04)
Swell Potential (ASTM D 4546-03)
Pocket Torvane
Unconfined Compression - Soil (ASTM D 2166-06)
Unconfined Compression - Rock (ASTM D 2938-95)
Unconsolidated Undrained Triaxial
(ASTM D 2850-03)
Unit Weight (ASTM D 4767-04)
Vane Shear (AASHTO T 223-96 [2004])
-200 200 Wash (ASTM D1140-14)
VS
UW
UU
UC
TV
SW
SL
SG
SE
R
REPORT TITLE
BORING RECORD LEGEND
D151 of 179
GB-1
GB-2
-200 (4% G, 88% S, 8% F)
M (15%)
Poorly graded SAND with SILT (SP-SM); trace GRAVEL ; grey-brown, moist, (disturbed).
Poorly graded SAND (SP); grey with black mottling, moist.
SILTY SAND (SM); grey with black, moist.
Lean CLAY (CL); brown, moist, stiff, with white gypsum veins.
Poorly graded SAND (SP); dark grey, moist.
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-01
TIME COMPLETED
0830
LOCATION DESCRIPTION
Northwest corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-01
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D152 of 179
GB-1
GB-2
PA (1% G, 89% S, 10% F)
M(13%)
Poorly graded SAND (SP); grey-brown, moist.
Lean CLAY (CL); brown, moist, stiff.
Bottom of test pit at 7.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-02
TIME COMPLETED
0850
LOCATION DESCRIPTION
West-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
7.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-02
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
D153 of 179
GB-1
GB-2
-200 (0% G, 96% S, 4% F)
M (15%)
PI (LL= 45, PL = 23, PI =22)
M (25%)
Poorly graded SAND with SILT (SP-SM); grey-brown with black, moist.
Lean CLAY (CL); brown, moist, stiff.
Poorly graded SAND (SP); grey-brown, moist.
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-03
TIME COMPLETED
LOCATION DESCRIPTION
West-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-03
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D154 of 179
GB-1
GB-2
-200 (0% G, 95% S, 5% F)
M (17%)
Poorly graded SAND with SILT (SP-SM); brown, moist.
Poorly graded SAND (SP); black, moist.
Lean CLAY (CL); brown, moist, stiff.
Poorly graded SAND (SP); black, moist.
Bottom of test pit at 10.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-04
TIME COMPLETED
LOCATION DESCRIPTION
Southwest corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
10.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-04
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 D155 of 179
GB-1 PA (2% G, 95% S, 5% F)
M (10%)
Poorly graded SAND with SILT (SP-SM); dark brown, moist.
Poorly graded SAND (SP); grey-black, moist.
Lean CLAY (CL); brown, moist.
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-05
TIME COMPLETED
LOCATION DESCRIPTION
South-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-05
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D156 of 179
GB-1
GB-2
GB-3
GB-4
-200 (0% G, 97% S, 3% F)
M (14%)
-200 (2% G, 95% S, 3% F)
M (10%)
PA (8% G, 82% S, 10% F)
M (11%)
Poorly graded SAND (SP); dark brown with trace of yellow, moist.
Grey-brown, trace gravel.
Poorly graded SAND with CLAY (SP-SC); brown, moist, trace gravel.
Lean CLAY (CL); brown, moist, stiff.
Bottom of test pit at 9.5 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-06
TIME COMPLETED
1011
LOCATION DESCRIPTION
South-center edge of Pond No.12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.5 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-06
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D157 of 179
GB-1
GB-2
-200 (0% G, 94% S, 6% F)
M (14%)
PA (1% G, 94% S, 5% F)
M (13%)
Poorly graded SAND with SILT (SP-SM); grey-brown, moist.
Poorly graded SAND (SP); brown, moist, some gravel.
Seepage at 6.5 feet.
Lean CLAY (CL); brown, wet, soft.
Bottom of test pit at 8.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-07
TIME COMPLETED
LOCATION DESCRIPTION
East-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-07
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D158 of 179
GB-1
GB-2
-200 (7% G, 89% S, 4% F)
M (14%)
PA (1% G, 95% S, 4% F)
M (11%)
Poorly graded SAND (SP); dark brown, moist.
Brown, trace fines.
Bottom of test pit at 12.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-08
TIME COMPLETED
1155
LOCATION DESCRIPTION
Southeast corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
12.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
130
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-08
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
12 D159 of 179
GB-1
GB-2
GB-3
-200 (2% G, 89% S, 9% F)
M (14%)
PA (0% G, 97% S, 3% F)
M (14%)
Poorly graded SAND with SILT (SP-SM); brown, moist.
Poorly graded SAND (SP); light brown, moist, trace gravel.
Lean CLAY (CL); brown with traces of white and grey lines, moist, stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 12.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-09
TIME COMPLETED
1215
LOCATION DESCRIPTION
East-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
12.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
130
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-09
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
12 D160 of 179
GB-1
GB-2
-200 (0% G, 90% S, 10% F)
M (14%)
-200 (1% G, 97% S, 2% F)
M (6%)
Poorly graded SAND with SILT (SP-SM); dark brown, moist.
Poorly graded SAND (SP); light brown, moist.
Lean CLAY (CL).
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-10
TIME COMPLETED
1230
LOCATION DESCRIPTION
East-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-10
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D161 of 179
GB-1
GB-2
-200 (0% G, 97% S, 3% F)
M (10%)
PA (0% G, 93% S, 7% F)
M (9%)
Poorly graded SAND (SP); dark brown, moist.
Poorly graded SAND with SILT (SP-SM); light brown, moist.
Lean CLAY (CL); brown, moist, medium stiff.
Bottom of test pit at 10.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-11
TIME COMPLETED
1245
LOCATION DESCRIPTION
Norththeast corner of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
10.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-11
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 D162 of 179
GB-1
GB-2
GB-3
-200 (0% G, 91% S, 9% F)
M (16%)
-200 (0% G, 93% S, 7% F)
M (13%)
PI (LL = 36, PL = 19, PI = 17)
M (24%)
Poorly graded SAND with CLAY (SP-SC); dark brown, moist.
Poorly graded SAND (SP); light brown, moist, trace gravel.
Seepage at 3 feet.
Lean CLAY (CL); brown, moist, soft.
Poorly graded SAND (SP); light brown, moist.
Bottom of test pit at 8.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-12
TIME COMPLETED
1310
LOCATION DESCRIPTION
North-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-12
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D163 of 179
GB-1
GB-2
PA (1% G, 95% S, 4% F)
M (9%)
-200 (3% G, 96% S, 1% F)
M (6%)
Poorly graded SAND (SP); grey-black, moist.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown with grey patches, moist.
Encountered CLAY at 8 feet bgs but test pit collapsed and was terminated at 8 feet bgs.
Bottom of test pit at 8.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-13
TIME COMPLETED
1330
LOCATION DESCRIPTION
North-center edge of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
8.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-13
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 D164 of 179
GB-1
GB-2
-200 (2% G, 93% S, 6% F)
M (14%)
-200 (0% G, 97% S, 3% F)
M (7%)
Poorly graded SAND with SILT (SP-SM); brown with black patches, moist, trace gravel.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 10.5 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-14
TIME COMPLETED
1345
LOCATION DESCRIPTION
West-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
10.5 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-14
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 D165 of 179
GB-1
GB-2
-200 (0% G, 95% S, 5% F)
M (13%)
PA (1% G, 88% S, 11% F)
M (11%)
Poorly graded SAND with SILT (SP-SM); dark brown, moist.
Grey with black.
Lean CLAY (CL); brown, moist, medium-stiff.
Poorly graded SAND (SP); brown, moist.
Bottom of test pit at 9.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-15
TIME COMPLETED
1350
LOCATION DESCRIPTION
West-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
9.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-15
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
D166 of 179
GB-1
GB-2
-200 (1% G, 92% S, 7% F)
M (15%)
-200 (2% G, 86% S, 12% F)
M (7%)
Poorly graded SAND with SILT (SP-SM); grey with black, moist.
Brown with grey.
Lean CLAY (CL); brown, moist.
Poorly graded SAND (SP); brown, moist.
Lean CLAY (CL); brown, moist.
Poorly graded SAND (SP).
Bottom of test pit at 11.0 ft bgs
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2010) except as noted on the Soil or Rock Legend or below.
GROUNDWATER
READINGS
LOGGED BY
Alex Limpert
FINAL BY
Nick Simon
TEST PIT NUMBER
18T-16
TIME COMPLETED
1405
LOCATION DESCRIPTION
East-center of Pond No. 12
SURFACE ELEVATION
142.0 ft
CONTRACTOR
City of Santa Maria
EQUIPMENT
John Deere 310 SJ Backhoe
BUCKET WIDTH
24"
DATE STARTED
6-8-18
TIME STARTED
DATE COMPLETED
6-8-18
BACKFILLED WITH
Approved Native Fill
TOTAL DEPTH OF TRENCH
11.0 ft
ORIENTATION
TEST PIT LOCATION (Lat/Long or North/East and Datum) -- DURING EXCAVATION Not EncounteredAFTER EXCAVATION
DATE
6/8/2018
Sample LocationSample Number Moisture Content (%)Dry Unit Weight(pcf)Shear Strength(ksf)
PROJECT NAME
Pond No. 12 Rehabilitation
PROJECT NUMBER
218-244
SHEET
1 of 1
ELEVATION (ft) Material Graphics
140
138
136
134
132
Remarks
DEPTH (ft)
TEST PIT NUMBER
18T-16
DESCRIPTION
TRENCH LOG 244-218_NS.GPJ CALIFORNIA YEH LIBRARY (FEB 2013).GLB 7/30/18 0 1
2 3
4 5
6 7
8 9
10 11
D167 of 179
Project No. Date Checked By N. Simon
Boring No. Sample No. Depth (ft) Sample Type Gravel > #4 (%) Sand (%) Fines < #200 (%) LL PI pH R (ohm- cm) SO42- (mg/kg) Cl- (mg/kg) Max. Unit Weight (pcf) Optimum Water Content (%) 18T-01 1 1 GB 14.8 -- 4 88 8 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-02 1 1 GB 13.4 -- 1 89 10 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-03 1 1 GB 15.2 -- 0 96 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-03 2 6.5 GB 25.4 -- -- -- -- 45 22 -- -- -- -- -- -- -- Lean CLAY (CL) 18T-04 1 1 GB 16.8 -- 0 95 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM) 18T-05 1 3.5 GB 10.3 -- 2 95 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 1 1 GB 14.4 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 2 6 GB 9.5 -- 2 95 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-06 3 7.5 GB 11.1 -- 8 82 10 -- -- -- -- -- -- -- -- -- Well-graded SAND with clay (SW-SC)18T-07 1 1 GB 14.2 -- 0 94 6 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-07 2 5 GB 13.1 -- 1 94 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-08 1 1 GB 13.6 -- 7 89 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-08 2 9 GB 11.4 -- 1 95 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-09 1 1 GB 13.7 -- 2 89 9 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-09 2 5 GB 10.0 -- 4 91 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-10 1 2 GB 13.5 -- 0 90 10 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-10 2 5 GB 5.9 -- 1 97 2 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-11 1 1 GB 9.8 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-11 2 5 GB 9.2 -- 0 93 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC) 218-244 6/22/2018
Summary of Laboratory Test Results
R-Value
Project Name Santa Maria WWTP - Pond 12 Rehabilitation Project Manager J. Blanchard Atterberg Corrosion
USCS Classification
Sample Location
Moisture
Content
(%)
Dry Unit
Weight
(pcf)
Gradation Compaction
D169 of 179
Project No. Date Checked By N. Simon
Boring No. Sample No. Depth (ft) Sample Type Gravel > #4 (%) Sand (%) Fines < #200 (%) LL PI pH R (ohm- cm) SO42- (mg/kg) Cl- (mg/kg) Max. Unit Weight (pcf) Optimum Water Content (%) 18T-12 1 1 GB 16.1 -- 0 91 9 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-12 2 3.5 GB 12.9 -- 0 93 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-12 3 5 GB 24.3 -- -- -- -- 36 17 -- -- -- -- -- -- -- Lean CLAY (CL) 18T-13 1 5 GB 8.5 -- 1 95 4 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP) 18T-13 2 7 GB 5.9 -- 3 96 1 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-14 1 1 GB 14.4 -- 2 93 6 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-14 2 8 GB 7.2 -- 0 97 3 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-15 1 1 GB 13.2 -- 0 95 5 -- -- -- -- -- -- -- -- -- Poorly-graded SAND (SP)18T-15 2 4 GB 11.4 -- 1 88 11 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with silt (SP-SM)18T-16 1 2 GB 14.8 -- 1 92 7 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC)18T-16 2 5 GB 6.9 -- 2 86 12 -- -- -- -- -- -- -- -- -- Poorly-graded SAND with clay (SP-SC) Summary of Laboratory Test Results
Project Name Santa Maria WWTP - Pond 12 Rehabilitation 218-244 6/22/2018 Project Manager J. Blanchard Corrosion Compaction
R-Value USCS Classification
Sample Location
Moisture
Content
(%)
Dry Unit
Weight
(pcf)
Gradation Atterberg
D170 of 179
Boring Sample No. Depth (ft) AASHTO Classification Tin ID Tin Mass (g) Tin + Soil (g) Tin + Dry Soil (g) No. 4 Dish ID No. 4 Dish Mass (g) No. 4 Dish + Dry no. 4 (g) Tin + Dry Soil Minus No. 4 Passing No. 4 Passing No. 200 % Gravel % Sand % Fines Water Content (%) 18T-01 1 1 -- 106B 134.7 198.9 190.6 2X 21.0 23.5 183.8 96% 7.7% 4% 88% 8% 14.8%18T-03 1 1 -- 107C 135.0 172.9 167.9 -- 0.0 0.0 166.5 100% 4.3% 0% 96% 4% 15.2%18T-04 1 1 -- 109C 134.7 193.2 184.8 -- 0.0 0.0 182.2 100% 5.2% 0% 95% 5% 16.8%18T-06 1 1 -- 108A 134.7 205.2 196.3 -- 0.0 0.0 194.2 100% 3.4% 0% 97% 3% 14.4%18T-06 2 6 -- 203A 134.9 198.5 193.0 1U 24.1 25.1 190.3 98% 2.9% 2% 95% 3% 9.5%18T-07 1 1 -- 301A 122.9 194.5 185.6 -- 0.0 0.0 181.9 100% 5.9% 0% 94% 6% 14.2%18T-08 1 1 -- 302A 122.8 174.6 168.4 2N 21.2 24.3 163.3 93% 4.4% 7% 89% 4% 13.6%18T-09 1 1 -- 303A 122.5 174.9 168.6 1L 24.3 25.1 163.5 98% 9.3% 2% 89% 9% 13.7%18T-10 1 2 -- 306A 122.9 175.9 169.6 -- 0.0 0.0 164.7 100% 10.5% 0% 90% 10% 13.5%18T-10 2 5 -- 307A 123.0 173.2 170.4 1H 23.9 24.3 168.9 99% 2.3% 1% 97% 2% 5.9%18T-11 1 1 -- 107A 134.8 178.6 174.7 -- 0.0 0.0 173.4 100% 3.3% 0% 97% 3% 9.8%18T-12 1 1 -- 101A 134.8 197.7 189.0 2J 20.8 21.0 183.9 100% 9.0% 0% 91% 9% 16.1%18T-12 2 4 -- 101R 135.3 193.8 187.1 -- 0.0 0.0 183.5 100% 6.9% 0% 93% 7% 12.9% Percent Passing No. 200 Sieve
Test Methods: ASTM D1140, D2487
Poorly-graded SAND (SP),yellow
brown, moist
USCS Classification
& Soil Description
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP), dark grey,
moist
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP), dark
grey, moist
6/15/2018
Project Manager Jon Blanchard
SPECIMEN ID AND MEASUREMENTS
Testing Date
City of Santa Maria WWTP - Pond 12 Rehabilitation
N. Simon
Project Name
Poorly-graded SAND with silt (SP-SM), dark grey, moist
Poorly-graded SAND (SP),
brown, moist, few gravel
Poorly-graded SAND with silt (SP-SM), brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown, moist
Poorly-graded SAND with silt (SP-SM), dark brown, moist Poorly-graded SAND (SP),
brown, moist
Poorly-graded SAND (SP),
brown, moist
Prewash Washed
Tested By R. Atiliano/A. Limpert Checked By
Project No. 218-244
D171 of 179
Boring Sample No. Depth (ft) AASHTO Classification Tin ID Tin Mass (g) Tin + Soil (g) Tin + Dry Soil (g) No. 4 Dish ID No. 4 Dish Mass (g) No. 4 Dish + Dry no. 4 (g) Tin + Dry Soil Minus No. 4 Passing No. 4 Passing No. 200 % Gravel % Sand % Fines Water Content (%) 18T-13 2 7 -- 102R 135.1 204.7 200.8 2H 20.8 23.0 198.1 97% 0.8% 3% 96% 1% 5.9%18T-14 1 1 -- 101B 134.5 220.2 209.4 2R 20.8 22.0 204.0 98% 5.6% 2% 93% 6% 14.4%18T-14 2 8 -- 4A 135.0 203.7 199.1 -- 0.0 0.0 197.0 100% 3.3% 0% 97% 3% 7.2%18T-15 1 1 -- 102A 134.9 223.2 212.9 -- 0.0 0.0 209.1 100% 4.9% 0% 95% 5% 13.2%18T-16 1 2 -- 9B 135.5 188.9 182.0 2I 20.9 21.2 178.5 99% 6.9% 1% 92% 7% 14.8%18T-16 2 5 -- 101B 130.8 180.5 177.3 1Y 24.4 25.5 170.7 98% 11.8% 2% 86% 12% 6.9% Poorly-graded SAND with silt (SP-SM), dark brown, moist, trace gravel
Poorly-graded SAND (SP),
brown, moist
Poorly-graded SAND (SP), dark
brown, moist
Poorly-graded SAND with clay
(SP-SC), dark brown , moist
Poorly-graded SAND with clay
(SP-SC), brown , moist
Poorly-graded SAND (SP),
brown, moist
Tested By R. Atiliano/A. Limpert Checked By N. Simon Testing Date 6/15/2018
SPECIMEN ID AND MEASUREMENTS
Prewash Washed
USCS Classification
& Soil Description
Percent Passing No. 200 Sieve
Test Methods: ASTM D1140, D2487
Project Name City of Santa Maria WWTP - Pond 12 Rehabilitation Project No. 218-244 Project Manager Jon Blanchard D172 of 179
Project Manager
Boring No. Sample
No.
Depth
(ft)
Water
Content
(%)
Gravel
(%)
Sand
(%)
Fines
(%)
D10 (mm) D30 (mm) D50 (mm) D60 (mm) Cu Cc
USCS
Classification
& Soil
Description
AASHTO
Classification
18T-02 1 1 13.4% 1% 89% 10.0% 0.08 0.21 0.32 0.38 5.10 1.60 Poorly-graded
SAND with SILT (SP-SM), brown, moist
--
18T-05 1 3.5 10.3% 3% 95% 2.9% 0.17 0.31 0.42 0.55 3.30 1.00 Poorly graded
SAND (SP), brown,
moist
--
18T-06 3 8 11.1% 8% 82% 10.4% 0.07 0.26 0.38 0.47 6.70 2.10 Well-graded SAND
with CLAY (SW-SC), brown, moist,
trace GRAVEL
--
18T-07 2 5 13.1% 1% 94% 4.6% 0.14 0.27 0.38 0.45 3.20 1.20 Poorly-graded
SAND (SP), brown,
moist, trace clay
fines
--
18T-08 2 9 11.4% 2% 95% 3.7% 0.15 0.29 0.41 0.52 3.50 1.10 Poorly-graded
SAND (SP), brown,
moist, trace fines
--
Mechnical Sieve Analysis
Test Methods: ASTM D6913, D2487, D4718
Project Name
Checked By
218-244
SUMMARY OF RESULTS
Testing Date
City of Santa Maria WWTP-Pond 12 Rehabilitation Project No.
Jon Blanchard Tested By R. Atilano/A. Limpert
N. Simon 6/15/2018
D173 of 179
Boring No. Sample
No.
Depth
(ft)
Water
Content
(%)
Gravel
(%)
Sand
(%)
Fines
(%)
D10 (mm) D30 (mm) D50 (mm) D60 (mm) Cu Cc
USCS
Classification
& Soil
Description
AASHTO
Classification
18T-09 2 5 10.0% 4% 91% 4.9% 0.11 0.22 0.32 0.37 3.30 1.10 Poorly-graded
SAND (SP), brown,
moist, trace fines
and gravel
--
18T-11 2 5 9.2% 1% 93% 6.6% 0.11 0.26 0.36 0.41 3.70 1.40 Poorly-graded
SAND with CLAY
(SP-SC), brown,
moist, clod of
CLAY
--
18T-13 1 5 8.5% 1% 95% 3.9% 0.17 0.33 0.47 0.58 3.40 1.10 Poorly-graded
SAND (SP), brown,
moist, trace SILT
--
18T-15 2 4 11.4% 1% 88% 11.1% 0.08 0.22 0.33 0.38 5.10 1.70 Poorly-graded
SAND with SILT (SP-SM), , dark grey,
moist
--
#DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 #DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 #DIV/0! ##### ###### ##### ###### ##### ##### ##### ##### #DIV/0! Well-Graded
GRAVEL with Sand
(GW) brown,
moist, subrounded
gravel
0 SUMMARY OF RESULTS
D174 of 179
18T-02
1 Poorly-graded SAND with SILT (SP-SM)
18T-05
1 Poorly graded SAND (SP)
Boring No.:
Sample No.:
Boring No.:
Sample No.:
USCS
Classification:
USCS
Classification:
GRADATION CHARTS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines --------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel ---------->| <------------------------- Sand -------------------->| <--------- Fines --------->| D175 of 179
18T-06
3 Well-graded SAND with CLAY (SW-SC)
18T-07
2 Poorly-graded SAND (SP)
Boring No.:
GRADATION CHARTS
USCS
Classification:
USCS
Classification:
Boring No.:
Sample No.:
Sample No.:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand -------------------->| <--------- Fines ------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand --------------------->| <--------- Fines ------->| D176 of 179
18T-08
2 Poorly-graded SAND (SP)
18T-09
2 Poorly-graded SAND (SP)
GRADATION CHARTS
Boring No.:
Sample No.:
USCS
Classification:
Boring No.:
Sample No.:
USCS
Classification:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------ Sand ---------------------->| <--------- Fines --------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines ------->| D177 of 179
18T-11
2 Poorly-graded SAND with CLAY (SP-SC)
18T-13
1 Poorly-graded SAND (SP)
GRADATION CHARTS
Boring No.:
Sample No.:
USCS
Classification:
USCS
Classification:
Sample No.:
Boring No.:
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <---------------------- Sand ------------------------>| <--------- Fines-------->| 0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <------------------------- Sand ---------------------->| <--------- Fines --------->| D178 of 179
18T-15
2 Poorly-graded SAND with SILT (SP-SM)
Boring No.:
Sample No.:
USCS
Classification:
GRADATION CHARTS
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
1/2"3/4"1"2"3" 3/8" No. 4 No. 10 No. 20 No. 40 No. 60 No. 100 No. 200 |<-------------- Gravel -------------->| <---------------------- Sand ------------------------>| <--------- Fines -------->| D179 of 179
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES
APPENDIX D GSI WATER SOLUTIONS
PERCOLATION POND PERFORMANCE
EVALUATION
City of Santa Maria
Wastewater Treatment Facility
Percolation Pond Performance Evaluation
April 16, 2024 (Revised June 4, 2024)
Prepared by:
GSI Water Solutions, Inc.
418 Chapala Street, Suite H, Santa Barbara, CA 93101
This page intentionally left blank.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. iii
Contents
Introduction ............................................................................................................................................................... 1 Facility Operation ...................................................................................................................................................... 3 Percolation Capacity ................................................................................................................................................. 6 Empirical Flow Testing .......................................................................................................................................... 6 Results7
Water Balance Results ..................................................................................................................................... 7 Discussion ......................................................................................................................................................... 8 Closure and Operational Considerations .............................................................................................................. 12 Tables
Table 1. Santa Maria Wastewater System Percolation Pond Details.................................................................... 3 Table 2. Summary of Flow Testing Results ............................................................................................................. 8 Table 3. Santa Maria Wastewater System Percolation Capacity .......................................................................... 9 Figures
Figure 1. Location Map ............................................................................................................................................ 4 Figure 2. Site Map .................................................................................................................................................... 5 Figure 3. Qualitative Pond Performance ............................................................................................................... 10 Figure 4. Quantitative Pond Performance............................................................................................................. 11 Attachments
Attachment A Percolation Pond Hydrographs
Attachment B Daily Effluent Flow Volumes
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. iv
This page intentionally left blank.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 1
Introduction
This report presents the results of a hydrogeologic assessment conducted by GSI Water Solutions, Inc. (GSI) to evaluate the current percolation capacity of ponds at the City of Santa Maria’s (City) Wastewater Treatment Facility (Wastewater System). GSI is collaborating with Yeh & Associates (Yeh) and Carollo Engineers to present a long-term percolation test to quantify the inflow, outflow, evaporation, and percolation of water that is directed into the City’s percolation ponds.
The City has faced ongoing challenges with relatively poor performance of their percolation ponds at the Wastewater System. A series of investigations over the past couple of decades have documented challenges with the percolation capacity of these ponds and identified several problems that have caused reduced infiltration capacity including clay layers at shallow depths beneath the ponds and with a minimal downward hydraulic gradient, as the main reasons for hampered infiltration and percolation.
The City’s Wastewater System is located within the Santa Maria Valley Management Area of the Santa Maria Groundwater Basin1. The site is underlain by
alluvial deposits of gravel, sand, silt and clay.
Percolation of treated wastewater from the site
can be impeded by shallow groundwater
beneath the site and by layers of clay present in
the area. The uppermost material at the site
becomes progressively finer to the west
(towards the coast). Sand and silt from the City
of Santa Maria extends towards the west to a
point approximately halfway to Guadalupe. Clay
and silt are present from this area westward.
Groundwater elevations near the site have
been as high as 30 feet below ground around
the year 2000, which have since declined to
about 110 feet below ground. Relative to the
site location, the percolation capacity is
expected to be relatively better to the east
towards Santa Maria and relatively worse
towards the west.
To document the current percolation capacity of the ponds, GSI developed and conducted flow monitoring within the City’s current percolation ponds. The objective of this flow monitoring was to understand the current wastewater percolation capacity, which involved recording inflow volumes of the treated wastewater directed into the percolation ponds, along with evaporation and rainfall, and from these data, estimating rates of wastewater percolation into the underlying groundwater basin and evaporation rates from pond water surface. The elements quantified in this overall water balance into each of the facility’s 15 percolation ponds are presented in the graphic below. Together, the documentation of these inflow components (effluent and precipitation) and outflow components (percolation and evaporation) provide the overall water budget for these ponds for this assessment.
1 Luhdorff & Scalmanini. 2025. 2024 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition Santa Maria Valley Management Area. April 2025.
Geologic Cross Section (Luhdorff & Scalmanini, 2004)
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 2
A forthcoming report will document whether the ponds' performance has changed significantly relative to this assessment and several prior studies that focused on the existing percolation ponds. The forthcoming report will also present results of field exploration of the materials below the percolation ponds that is currently underway. GSI will conduct this further assessment to identify the geotechnical and hydrogeological factors affecting percolation capacity and identify any possible operational modifications that could be implemented to address reduced percolation pond capacity.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 3
Facility Operation
The City Utilities Department operates the Wastewater System and associated percolation ponds on an approximate 211-acre property in Santa Maria, California on Black Road between W Main Street and W Stowell Road approximately 1.5 miles west of the City. The location of the site is presented on Figure 1 and the respective locations of all percolation ponds within the facility are shown in Figure 2.
The Wastewater System is designed to treat 13.5 million gallons per day (MGD) on a maximum month basis to a secondary treatment level but is limited in disposal capacity to 8 MGD2. The percolation ponds are not currently performing adequately as indicated by percolation pond level measurements and effluent flow as presented in this report. The treatment system does not produce any recycled water, and therefore percolation and evaporation are the only means of disposal of the produced effluent.
Operationally, the treated effluent is directed to one or more ponds at a time by City staff to ponds that are available (not full) at a filling rate that greatly exceeds the percolation rate of an individual pond. Typically, a couple of ponds have been emptied and dried out and are available to receive the effluent. The maximum water depth within the 15 percolation ponds varies between completely dry and a maximum depth of 8 and 16 feet when filled. Water levels are required to be maintained with at least two feet of freeboard.
A summary of the area of the available percolation ponds to accommodate the produced effluent is presented in Table 1. Notably, the area covered by each pond varies with water depth such that water within each pond covers more area when full than when partially filled. The total volume of the ponds is approximately 300 million gallons, as shown, which is equal to 934 acre-feet.
Table 1. Santa Maria Wastewater System Percolation Pond Details Pond Area Empty
(Acres)
Area Full
(Acres) 1
Maximum Pond
Depth (Feet)2
Approximate Volume
(Million gallons)
1 6.3 8 11 26
2 7.2 8 11 27
3 3 4 16 19
4 4.4 4.6 10 11
5 6.2 7 16 36
6 6.6 7 11 25
7 1.5 2 12 4
8 2.9 3.5 9 9
11 6.2 6.3 8 16
12 5.9 7 12 25
13 6.7 8 12 28
14 6.3 7 12 26
15 5.3 7 12 24
DKC 6 7 9 19
Wash Pond 1 1.5 15 6
Total 75.5 87.9 -- 304
1: Acreage shown represent water level when full with approximately 2 feet of freeboard. 2: Maximum pond depth determined based on observed depths measured by City staff. 2 The Central Coast Regional Water Quality Control Board reduced the rated treatment capacity of the wastewater system based on the reduced percolation capacity of the ponds.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 4
Figure 1. Location Map
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 5
Figure 2. Site Map
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 6
Percolation Capacity
The current percolation capacity of the Wastewater System percolation ponds is described in the following section. A comparison of the historic percolation capacity of the ponds, along with a history of proposed and implemented improvements to the percolation ponds, will be presented in a forthcoming report.
Empirical Flow Testing
To estimate the current
percolation capacity of
the ponds, a water
balance was conducted
by GSI to estimate the
proportions of the
treated wastewater
directed into the
Wastewater System’s
ponds that ultimately
either percolate into the
underlying groundwater
or evaporate. The
analysis took place over
an approximately five-month period between
November 2023 and April 2024. This water balance conducted by GSI consisted of documenting pond level conditions on a daily basis in the course of the normal operation of the facility during this period. The ponds are operated serially through a series of fill, dry, and rest cycles. City staff do not allow percolation to continue until each pond is dry, but instead, when several feet of water remain, the City staff pumps water into another dry pond. The testing period began and ended when a similar number of ponds were completely dry. No diversions of this effluent are directed to any location other than the percolation ponds.
The water level in each pond is
measured and recorded daily
relative to staff gauges (shown
on this photo) by City staff,
which was compiled for this
water balance study. Daily
records of effluent volumes
directed to the 15 percolation
ponds were compiled from City
records. Hydrographs of the
pond water levels during the
testing period are presented as
Attachment A.
Particular attention was
focused on the rates at which effluent was directed to each of the 15 ponds, which all drained from a relatively full state until the wastewater had receded significantly. The daily volumes of effluent directed to the ponds are presented as Attachment B.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 7
To estimate evaporation rates from the percolation
ponds, GSI installed a Class A evaporation pan
equipped with a data logger (shown in this photo). The
evaporation pan meets National Weather Service Class
A specifications. It is constructed of low carbon type
304 stainless steel and is fitted with an external
NovaLynx 255-100 Analog Output Evaporation Gauge
automated system. The Analog Output Evaporation
Gauge is designed to accurately measure water level
in the evaporation pan. As water evaporates from the
pan or precipitation fills the pan, a float mechanism
turns a precision potentiometer which was monitored
by a data logger to record the change. Evaporation
data are shown on the hydrographs in Attachment A.
Precipitation data was compiled from records from
nearest rain gauge operated by the California Irrigation Management Information System (CIMIS) station
number 232 near the Santa Maria Airport to the
southwest. Precipitation records for another rainfall
gauge located farther away to the north on the Nipomo
Mesa were evaluated, but not used for this analysis
because of the much greater distance from the site
and relatively higher elevation of the gauge.
Results
During the 5-month duration of the flow testing during the winter of 2023 and spring of 2024, the ponds were partially or entirely full for a majority of the period. On average, the ponds were wetted for 72 percent of the period, which varied from 63 to 79 percent of the days during this period, respectively for ponds 15 and
5. Based on this water balance, the average percolation capacity for the Wastewater Facility was 0.27 feet per day during this period, which is equal to 3.3 inches per day or 9.6x10-5 cm/sec. This percolation rate is representative of sandy silt to clayey sand.
Water Balance Results
The total volume of effluent flow directed to the percolation ponds averaged 6.63 MGD and ranged between
5.20 and 8.42 MGD.
In addition to contributions to the ponds from the effluent, significant precipitation fell during the period between mid-November 2023 and mid-April 2024. During this period, a total of 15.0 inches of precipitation fell on the percolation ponds during a series of winter storms. Rainfall during this period added an additional 33 million gallons of water to the percolation ponds, which was equal to 0.22 MGD on average. This volume added an additional 3% of water relative to the effluent flow. Notably, this 15 inches of rainfall that fell during this period is roughly similar to the 12 inches of evaporation that occurred. During the other warmer and drier times of the year, rainfall will be limited or non-existent and evaporation will be higher.
The total inflow to the percolation ponds totaled 6.85 MGD from these two sources:
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 8
• 6.63 MGD from effluent flow (97% of total inflow), and • 0.22 MG from precipitation (3% of total inflow).
The percolation ponds accommodated the entire inflow volume due principally to percolation and, to a lesser degree, to evaporation, although some accumulation of pond volume did occur. Of the total volume of inflow to the ponds by effluent and precipitation of 6.85 MGD:
• 6.68 MGD percolated (97% of total), which ranged from 5.4 to 6.7 MGD, and • 0.18 MGD evaporated (3% of total), which ranged from zero during rainy days in the winter to 0.4 MGD during the later spring months.
The results of the testing are summarized on Table 2.
Table 2. Summary of Flow Testing Results
Flow Component Average Volume
MGD
Proportion of
Total Inflow
Inflow
Wastewater
System
Effluent
6.63 97%
Precipitation 0.22 3%
Outflow
Percolation 6.68 97%
Evaporation 0.18 3%
Note: MGD Millions of Gallons per Day
During the other warmer and drier times of the year, rainfall will be much lower, and the proportion of evaporation compared to effluent flow will be higher. Specifically, evaporation during the summer months will be as much as 80 percent higher than evaporation during the study period for an average of 0.32 MGD.
Likewise, during the entire year evaporation should average 30 to 35 percent higher compared to the study period (average of 0.23 to 0.24 MGD, or 85 to 88 million gallons).
Discussion
The City provided estimates of percolation capacity based on data provided by Mr. Russ Newman with the City based on the City’s long-term familiarity with the operation and performance of the ponds. The City’s estimates of the percolation capacity provided a range of percolation rates for each pond, which was based on a longer period than was included in this water balance analysis.
The results of this water balance suggest that the measured percolation capacity during this period closely matched the City’s estimates; the City estimated percolation capacity of 7 to 11 MGD for the Wastewater Facility, while this water balance measured the percolation capacity to be an average of 6.85 MGD, which is near the lower end of the City’s estimate. The water balance did not support the middle and higher end of the City’s range of estimated percolation capacity during the testing period.
The observed water level variation shown on the hydrographs presented as Attachment A show that the required fill, drain, and rest cycles for each pond include several periods when no water is percolating (ponds are dry) while the ponds “rest” to accommodate nitrogen removal. The A summary of the approximate percolation capacity of each of the percolation ponds, along with the relative performance of each, is presented on Table 3.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 9
Table 3. Santa Maria Wastewater System Percolation Capacity Pond Name Percolation Capacity
(MGD) Performance
1 0.8 to 1.0 Decent
2 0.6 to 0.7 Medium
3 0.6 to 0.7 Medium
4 0.1 Poor
5 0.8 to 1.0 Medium
6 0.2 Poor
7 0.1 to 0.2 Poor
8 0.1 to 0.2 Poor
11 0.3 Mediocre
12 0.3 to 0.4 Mediocre
13 0.4 to 0.5 Mediocre
14 0.2 to 0.3 Poor
15 0.4 to 0.5 Medium
DKC 0.5 to 0.6 Medium
Wash Pond 0.1 Poor
Total 5.6 to 6.8
The City’s estimate of the percolation pond performance is provided on Figure 3. As shown, the best percolating ponds are estimated to have “decent” performance (ponds 1, 2, and 3) while some ponds are estimated to have “poor” performance (ponds 4, 6, and 7). Notably, no ponds were categorized as having “great” performance.
For comparison, a similar map of the pond performance based on the same criteria, but based on the current testing is provided on Figure 4, along with a comparison of the City’s estimate and the results of this water balance. As shown, the ponds are categorized somewhat similarly, but several ponds perform relatively worse including ponds 8, 14, and the Wash Pond that all perform poorly. Likewise, ponds 3 and 12 do not perform as well as previously presented. Pond 15 appears to be performing better, at “medium” performance than previously presented. As previously, no ponds were categorized as having “great” performance.
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 10
Figure 3. Qualitative Pond Performance
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 11
Figure 4. Quantitative Pond Performance
City of Santa Maria | Wastewater Treatment Facility Percolation Pond Performance Evaluation GSI Water Solutions, Inc. 12
Closure and Operational Considerations
The operation of the City’s Wastewater System, as currently configured, is limited by poor percolation capacity due to factors.. The data presented in this water balance suggest that the current performance of the ponds is limited by the current percolation capacity of approximately 6 to 7 MGD.
As presented in all of the hydrographs presented in Attachment A, there are periods where the ponds are empty and not percolating effluent. While the operation of the ponds requires frequent drying, as described, these periods when the ponds are dry decreases the overall percolation capacity proportionally. The ponds were dry for 28 percent of the period of this testing during a wet winter when increased percolation capacity is typically most needed.
A geotechnical data report was prepared by Yeh and Associates for the facility3 which present the operational alternatives that may be effective to regain percolation capacity at the Wastewater System. The preliminary recommendations presented by Yeh were discussed during the project and adequately identify operational improvements that are highly likely to improve percolation capacity including the following tasks.
1. Remove the upper 2 to 4 inches of accumulated organic layer that forms following drying of beds, when possible.
2. Following removal of the shallow organic layer, perform deep ripping of the bottom of each pond when dry.
3. When possible, plan and budget for removal of clayey and silty soil within the upper 5 to 10 feet of the ponds. Yeh suggested that the phased implementation of this task would provide the city to evaluate the effectiveness of this deep soil removal program, which would include soil sampling and testing before and after the removal process.
4. Operationally, Yeh recommends reducing the total suspended solids of the effluent being introduced to the ponds.
5. Yeh mentioned focus on the elevations of the groundwater within the aquifer below the percolation ponds, which may hinder percolation at greater depths. While monitoring of these conditions is important and may affect percolation, we understand that the greatest limitations to percolation within this system are due to the shallow organic layer (2 to 4 inches), deeper (ripping depth), and 5 to 10 feet (remedied by deep removal).
6. Lastly, installation of stilling wells within the ponds would provide improved data upon which to evaluate the effectiveness of the above operational improvements. We understand that the City is installing these stilling wells within many of the percolation ponds along with automated and remote monitoring devices, which will aid in the effective operation of the Wastewater Facility. 3 Yeh and Associates. 2024. Draft Geotechnical Data Report City of Santa Maria Wastewater Treatment Plant Percolation Pond Study. Prepared for Carollo Engineers. October 3, 2024.
ATTACHMENT A
Percolation Pond Hydrographs
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 1
FIGURE A-1
Percolation Pond 1 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.40 feet
per day
0.25 feet
per day
Average:
0.32 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 2
FIGURE A-2
Percolation Pond 2 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.30 feet
per day
0.15 feet
per day
Average:
0.22 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 3
FIGURE A-3
Percolation Pond 3 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.48 feet
per day
0.38 feet
per day
Average:
0.43 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 4
FIGURE A-4
Percolation Pond 4 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.14 feet
per day
Average:
0.14 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 5
FIGURE A-5
Percolation Pond 5 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.29 feet
per day
0.36 feet
per day
Average:
0.33 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 6
FIGURE A-6
Percolation Pond 6 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.08 feet
per day
Average:
0.08 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 7
FIGURE A-7
Percolation Pond 7 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.19 feet
per day
0.19 feet
per day
Average:
0.19 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 8
FIGURE A-8
Percolation Pond 8 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.22 feet
per day
0.18 feet
per day
Average:
0.20 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 11
FIGURE A-11
Percolation Pond 11 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.14 feet
per day
0.15 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 12
FIGURE A-12
Percolation Pond 12 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.08 feet
per day
0.23 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 13
FIGURE A-13
Percolation Pond 13 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.15 feet
per day
Average:
0.15 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 14
FIGURE A-14
Percolation Pond 14 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.13 feet
per day
0.09 feet
per day
Average:
0.10 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond 15
FIGURE A-15
Percolation Pond 15 Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.17 feet
per day
0.21 feet
per day
Average:
0.19 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond DKC
FIGURE A-DKC
Percolation Pond DKC Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.23 feet
per day
0.17 feet
per day
Average:
0.20 feet per day
Nov 2023 Dec 2023 Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 0
0.1 0.2
0.3 0.4
0.5 0.6
0.7 0.8
0.91 Evaporation (inches) 02468
10 12
14 16
18 Depth to Water (feet)
Pond Wash
FIGURE A-Wash
Percolation Pond Wash Hydrograph
Santa Maria Wastewater Treatment Facility
Santa Maria, California
0.22 feet
per day
0.17 feet
per day
Average:
0.19 feet per day
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Nov 2023
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 0 23 23 78 136 90 62 88 46 0 43 0 86 26 92
2 0 14 0 73 130 94 70 90 40 0 38 0 96 42 89
3 0 5 0 71 123 98 82 93 36 0 35 0 108 54 89
4 10 0 0 66 118 97 82 88 35 65 22 0 106 54 88
5 23 0 0 65 110 94 78 86 27 76 0 0 98 53 86
6 55 0 0 63 105 90 72 81 18 81 0 0 86 48 85
7 62 0 0 54 106 88 85 78 8 92 0 0 86 60 84
8 76 0 0 10 93 84 103 72 0 96 0 0 81 76 50
9 84 0 0 0 88 81 114 69 0 96 0 0 75 88 0
10 92 0 47 0 83 76 108 66 0 100 0 0 70 80 0
11 97 0 71 0 82 76 97 61 0 108 0 0 64 72 0
12 100 0 89 0 76 72 96 60 0 114 0 0 60 72 0
13 107 0 112 0 70 71 95 58 0 115 0 0 66 68 0
14 105 10 120 0 64 68 90 53 0 108 0 12 60 72 0
15 100 18 131 0 60 60 90 51 0 104 0 26 58 64 0
16 95 30 126 48 57 54 91 48 0 99 0 45 46 66 0
17 84 40 117 59 57 45 93 46 0 94 0 57 34 65 0
18 82 50 110 83 51 37 95 46 0 90 0 71 23 69 0
19 73 60 100 90 47 18 95 46 0 86 0 84 0 69 0
20 68 71 93 96 43 0 92 40 0 84 0 95 0 54 0
21 59 80 103 91 35 0 88 21 0 79 0 108 0 60 40
22 55 89 108 86 24 0 83 10 0 75 0 121 0 56 61
23 47 95 117 83 22 0 78 4 14 71 22 118 0 50 90
24 42 102 121 82 18 0 76 4 22 68 27 116 0 49 112
25 34 106 122 73 0 0 68 4 24 66 30 108 0 46 118
26 29 108 126 72 0 0 69 0 28 59 34 107 0 46 118
27 23 112 128 71 0 0 67 0 30 59 40 104 0 39 117
28 30 113 131 65 0 0 60 0 32 36 48 98 0 35 112
29 36 106 124 66 0 40 56 0 36 12 57 94 0 32 100
30 48 98 115 51 0 57 56 0 39 0 60 93 0 30 117
31 City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Dec 2023
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 60 93 106 0 0 57 31 0 46 0 65 91 0 23 114
2 68 86 100 0 0 76 0 0 49 0 68 86 0 23 113
3 71 78 92 0 0 85 0 0 52 0 70 83 0 18 100
4 74 72 84 0 0 93 0 0 57 0 72 80 0 14 107
5 79 66 84 0 0 86 0 44 57 0 72 76 0 5 108
6 83 60 90 0 0 87 0 72 60 0 75 72 0 2 106
7 89 55 96 0 0 84 0 90 66 0 80 71 0 0 68
8 89 48 100 0 6 80 0 84 60 0 83 65 24 0 38
9 94 42 99 0 45 80 0 82 55 0 87 66 32 0 0
10 96 36 93 0 44 78 0 80 53 0 90 62 35 0 0
11 97 32 84 0 64 78 0 75 50 0 93 59 40 0 0
12 99 18 78 0 72 78 0 72 48 0 96 53 48 0 0
13 100 6 72 0 80 84 0 70 40 0 90 52 52 0 0
14 96 4 65 0 87 88 60 68 40 0 92 49 60 3 0
15 90 0 60 0 91 84 60 65 36 12 102 37 62 34 0
16 84 0 40 0 102 84 72 64 35 38 96 33 67 42 0
17 75 0 6 0 112 80 86 60 32 48 84 22 70 60 0
18 67 0 0 0 115 79 99 59 32 56 86 0 74 72 0
19 62 0 0 39 120 78 108 43 22 67 86 0 86 80 0
20 56 0 0 48 126 77 114 23 0 73 84 0 99 84 0
21 48 10 0 72 138 76 109 10 0 78 83 0 103 84 0
22 46 33 0 79 126 73 106 0 0 82 76 0 103 79 0
23 41 50 0 83 131 72 102 0 0 85 75 0 106 75 0
24 33 65 0 84 128 70 100 0 0 89 72 6 108 72 0
25 28 80 0 86 124 70 96 0 0 91 68 22 104 69 0
26 21 90 0 85 117 67 92 0 0 92 67 25 96 64 10
27 12 101 31 85 113 66 87 0 0 93 63 36 94 60 10
28 6 102 101 87 108 68 86 0 0 100 50 39 90 55 15
29 0 105 131 86 106 63 83 0 0 111 45 47 90 56 13
30 0 98 142 86 102 62 81 34 19 107 30 61 85 56 17
31 0 94 152 86 96 60 80 55 24 106 0 77 85 40 15
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Jan 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 101 86 146 86 90 59 78 58 30 101 0 82 81 50 0
2 18 84 140 89 94 60 87 77 35 96 0 84 80 48 18
3 35 77 132 89 88 57 88 72 38 94 0 88 74 48 20
4 46 74 124 90 90 55 80 92 44 89 0 84 72 48 20
5 60 72 118 88 82 53 60 92 48 87 0 99 72 36 65
6 70 70 112 98 94 56 55 88 52 85 6 96 70 26 96
7 75 66 104 92 106 52 50 86 54 82 24 96 68 12 126
8 83 60 100 91 114 50 49 82 56 80 28 95 64 4 143
9 88 59 96 91 124 48 48 78 59 79 36 92 64 0 160
10 96 52 90 91 133 44 47 76 63 69 46 91 61 0 156
11 104 52 84 91 140 28 47 74 68 52 60 89 61 0 153
12 108 48 82 93 144 31 46 72 71 41 70 90 58 0 150
13 106 46 76 87 146 28 60 70 67 30 76 86 59 10 147
14 100 54 71 86 144 0 64 66 63 0 80 86 60 35 144
15 94 63 66 85 137 0 77 67 65 0 78 85 60 51 143
16 92 72 48 82 132 0 90 54 60 0 82 90 48 62 140
17 83 80 23 79 131 0 100 40 60 0 95 98 37 75 161
18 77 89 8 76 126 0 111 16 60 0 104 106 16 84 163
86 73 97 0 75 122 0 118 12 58 0 109 107 16 86 161
20 71 104 0 73 119 39 115 0 58 34 110 107 0 88 159
21 66 110 0 72 116 50 112 0 56 57 107 106 0 85 156
22 60 102 52 70 112 60 110 0 55 85 105 104 0 83 152
23 60 100 80 70 108 65 107 0 53 95 100 101 0 80 149
24 54 95 104 67 105 73 104 0 53 109 100 101 0 77 146
25 48 91 124 65 100 80 104 0 48 123 97 100 0 77 143
26 44 88 126 64 99 81 102 0 40 123 95 100 38 78 140
27 50 82 130 60 94 80 106 37 33 117 92 97 48 81 134
28 59 80 126 60 91 81 108 61 26 111 91 96 60 81 132
29 70 75 120 58 90 77 108 78 20 108 88 96 79 82 129
30 83 74 117 58 86 76 110 88 0 107 88 96 93 83 127
31 93 71 109 53 83 77 108 94 0 104 87 95 107 77 114
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Feb 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 99 68 107 56 108 76 106 94 12 100 86 95 109 27 123
2 105 65 104 54 138 74 105 91 0 99 85 95 110 76 120
3 107 63 98 56 154 72 96 87 12 96 84 93 107 73 116
4 101 72 108 52 149 72 94 84 36 92 83 90 103 71 113
5 96 83 124 52 142 72 94 83 58 90 83 93 102 69 116
6 94 93 126 52 140 71 94 82 79 88 83 94 100 68 114
7 90 102 141 34 134 70 96 80 76 112 68 92 98 69 114
8 85 108 148 0 131 70 96 78 74 131 67 93 96 70 124
9 89 110 152 0 127 68 98 76 72 130 66 100 102 71 123
10 92 110 148 0 136 68 100 74 70 124 63 104 106 72 120
11 94 106 140 0 148 66 100 71 68 120 56 107 108 74 118
12 96 106 136 0 156 64 102 69 66 116 50 112 112 74 117
13 99 104 138 0 159 64 102 67 66 112 46 117 116 75 131
14 104 101 143 0 162 55 104 66 65 109 33 120 118 75 132 15 106 100 148 0 168 43 104 64 64 107 28 122 122 77 168 16 109 100 153 0 170 35 105 75 62 107 24 127 124 78 168 17 106 98 153 40 170 20 108 85 60 106 12 126 120 78 165 18 110 96 154 58 172 8 104 84 58 106 6 130 122 74 162
19 114 96 156 73 174 6 102 84 59 110 6 132 126 72 162
20 116 95 160 81 176 0 98 83 59 114 0 137 131 72 161
21 118 92 162 95 178 0 100 69 55 117 0 136 132 72 158
22 119 89 166 104 183 0 101 52 48 115 0 140 132 73 158
23 121 91 165 109 180 0 101 36 40 115 0 142 132 76 154
24 121 94 168 112 183 0 103 23 34 116 0 142 132 76 153
25 121 96 172 113 184 0 105 10 26 116 0 143 132 76 150
26 120 108 170 108 184 0 106 0 16 112 0 142 131 77 146
27 120 119 168 104 184 0 104 0 0 109 0 136 127 76 144
28 122 124 171 101 186 0 106 0 0 109 0 138 122 77 126
29 124 132 168 103 187 0 108 0 0 105 0 136 112 80 112
30 31
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Mar 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 126 130 170 100 188 16 109 0 0 107 16 136 102 82 82
2 128 130 171 104 188 34 108 0 0 108 24 138 96 82 60
3 130 128 173 102 194 44 114 0 0 114 32 134 92 84 30
4 131 117 172 100 192 47 114 0 0 118 36 132 82 88 12
5 131 114 173 100 192 52 116 0 0 120 42 131 72 88 0
6 130 111 174 100 192 56 118 0 0 122 46 131 66 90 0
7 131 102 176 102 193 60 119 0 0 126 53 129 59 92 38
8 130 95 174 104 193 64 119 0 0 129 56 126 50 93 24
9 131 83 174 104 193 70 120 0 0 132 60 130 40 92 0
10 131 76 172 103 193 76 121 0 0 134 64 124 36 92 0
11 131 62 172 105 192 82 122 0 0 137 71 124 29 95 0
12 132 60 175 104 191 84 124 0 0 141 76 122 22 95 0
13 131 48 175 104 192 86 121 0 12 138 79 121 0 92 0
14 131 36 175 104 192 88 116 0 24 134 87 114 0 88 0
15 131 28 168 105 191 94 113 12 31 127 96 108 0 88 0
16 131 20 166 106 192 95 113 25 43 126 104 100 0 86 0
17 131 12 156 106 192 96 111 36 50 120 107 95 0 83 0
18 130 6 152 105 192 96 107 47 58 116 111 88 0 80 0
19 130 0 140 106 192 97 107 52 68 112 115 83 0 78 0
20 130 0 124 106 189 98 104 58 78 108 120 76 0 76 0
21 130 0 120 105 188 98 102 66 78 107 130 68 0 73 0
22 130 0 105 105 189 99 96 74 76 102 133 60 34 74 0
23 130 0 90 106 189 99 98 80 75 99 136 52 50 70 0
24 129 0 72 105 188 99 96 87 70 95 138 42 68 70 0
25 129 0 53 105 188 99 93 90 66 93 140 32 83 64 0
26 128 0 40 105 188 99 95 95 64 88 144 19 98 64 0
27 128 0 21 104 187 99 90 98 61 88 144 8 107 63 0
28 127 0 0 105 188 100 88 95 59 88 145 0 114 61 0
29 124 8 0 104 184 96 85 89 65 73 144 0 113 55 60
30 124 13 0 104 184 93 76 84 69 64 145 0 119 47 94
31 123 25 0 102 183 91 66 82 73 48 145 0 122 40 124
City of Santa Maria Wastewater Treatment Plant Percolation Pond Monitoring Apr 2024
Percolation Pond Height (in")
Day 1 2 3 4 5 6 7 8 11 12 13 14 15 DKC Wash
1 122 42 0 100 180 38 58 76 71 24 141 0 128 32 150
2 120 52 0 100 180 84 52 72 67 0 136 0 130 24 170
3 119 66 0 100 180 81 15 81 66 0 134 0 129 18 170
4 119 76 0 99 180 78 0 86 64 0 132 0 128 12 168
5 119 90 0 102 180 78 0 93 64 0 131 0 128 8 166
6 118 96 0 102 180 75 0 96 60 0 129 0 127 0 163
7 118 106 0 101 180 65 0 91 59 0 127 0 129 0 160
8 118 112 0 100 178 50 0 84 56 0 124 0 130 0 156
9 118 118 0 100 177 46 0 78 44 0 124 0 132 0 157
10 118 122 0 100 177 38 0 75 52 0 124 0 134 0 154
11 119 126 0 100 176 20 0 72 52 0 124 0 136 0 152
12 13
14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 31
ATTACHMENT B
Daily Effluent Flow Volumes
City of Santa Maria Wastewater Treatment Plant Daily Log 2023 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 2 (ft3) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare Time
1 6.87 5,440 91,445 71,804 1 1 34700 0 0 300 54,235 300 809 2 6.99 5,600 95,615 77,439 1 1 36400 0 0 300 57,212 400 801 3 6.39 4,640 88,220 69,472 1 1 31000 0 0 200 49,502 250 900 4 7.26 5,920 101,513 84,949 1 1 34800 0 0 400 58,432 250 552 5 7.29 5,600 91,881 75,867 1 1 35600 0 0 300 49,549 300 656 6 6.99 5,760 81,476 67,457 1 1 32400 0 0 300 45,631 250 821 7 6.90 5,760 82,411 67,662 1 1 32900 0 0 300 49,919 200 756 8 6.87 5,760 78,461 67,898 1 1 32400 0 0 300 52,432 250 805 9 6.75 5,920 89,145 77,077 1 1 34300 0 0 300 52,785 200 740 10 6.42 5,280 79,252 70,888 1 1 31300 0 0 200 46,537 200 800 11 6.51 5,760 87,236 76,306 1 1 35200 0 0 300 52,393 175 540 12 6.85 6,080 87,669 77,449 1 1 37800 0 0 400 53,930 175 600 13 6.54 5,120 71,244 62,821 1 1 33000 0 0 300 43,870 150 755 14 7.10 6,240 84,095 73,960 1 1 38200 0 0 300 50,361 150 605 15 6.61 5,440 81,631 67,665 1 1 35700 0 0 300 49,492 200 750 16 6.90 5,600 93,042 78,955 1 1 36300 0 0 300 53,857 150 755 17 6.57 4,960 84,259 68,806 1 1 32900 0 0 300 45,556 180 800 18 6.91 5,760 95,196 74,577 1 1 40100 0 0 300 53,200 100 648 19 6.80 5,760 87,413 71,730 1 1 37000 0 0 300 49,631 150 835 20 6.88 5,920 86,607 69,767 1 1 35000 0 0 300 51,628 170 830 21 6.91 5,760 89,244 68,678 1 1 35600 0 0 300 51,003 100 814 22 6.49 5,120 81,241 58,524 1 1 30100 0 0 200 46,296 175 759 23 6.43 5,600 95,302 71,456 1 1 34700 0 0 300 50,767 100 609 24 6.39 6,720 101,733 82,719 1 1 40700 0 0 400 58,930 100 507 25 6.32 5,600 89,684 67,716 1 1 35400 0 0 300 51,521 170 745 26 6.68 6,080 91,753 72,418 1 1 38400 0 0 300 50,136 150 800 27 6.70 5,760 77,621 73,637 1 1 35900 0 0 300 46,821 130 800 28 6.97 6,240 74,691 52,169 1 1 36700 0 0 300 30,618 160 815 29 6.53 5,760 68,231 53,708 1 1 35400 0 0 300 44,902 200 840 30 6.70 5,920 83,463 79,008 1 1 37400 0 0 300 50,678 100 815 AVE. 6.75 5696 86359 71086 35243 50061 186
H2S Readings
NOV WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2023 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 2 (ft3) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare Time
1 6.35 5440 79220 66,476 1 1 32700 0 0 300 47,278 150 810 2 6.49 6240 96219 83,326 1 1 42700 0 0 300 55,053 125 559 3 6.66 6080 96256 81,087 1 1 40700 0 0 300 54,156 200 751 4 6.75 5920 88475 72,182 1 1 37100 0 0 300 51,231 200 839 5 6.88 6080 92759 78,493 1 1 39400 0 0 300 54,540 200 730 6 6.53 5600 87578 71,042 1 1 37200 0 100 300 53,495 200 801 7 6.60 5920 95320 74,351 1 1 38900 0 0 300 55,960 200 755 8 6.34 5600 89026 70,799 1 1 38000 0 0 300 52,648 175 801 9 6.23 5920 96540 72,143 1 1 36900 0 0 300 57,078 200 734 10 6.58 6080 90160 76,975 1 1 40300 0 0 300 54,199 200 800 11 6.60 5600 77708 65,910 1 1 39300 0 0 300 48,854 150 823 12 6.74 6080 81800 68,094 1 1 39200 0 0 300 55,955 100 819 13 6.43 5280 83586 71,025 1 1 39900 0 0 300 55,282 200 802 14 6.59 5600 88668 70,876 1 1 39600 0 0 300 52,106 150 811 15 6.11 4960 78549 66,643 1 1 34600 0 0 200 44,882 125 820 16 6.21 5600 90728 77,356 1 1 40700 0 0 400 52,266 100 530 17 7.69 5920 89109 76,340 1 1 42100 0 0 300 55,706 125 632 18 6.71 5440 79680 65,641 1 1 35100 0 0 300 46,287 120 820 19 6.67 5440 86860 66,442 1 1 31700 0 0 300 52,178 150 805 20 8.16 5600 53123 64,524 1 1 38500 0 0 300 52,950 150 800 21 8.07 5760 89700 76,600 1 1 33100 0 0 300 53,558 200 744 22 6.63 5280 85021 70,333 1 1 36600 0 0 200 48,597 150 813 23 6.32 5440 87441 68,117 1 1 37400 0 0 300 49,367 150 646 24 6.14 5600 82281 72,158 1 1 37600 0 0 300 51,021 150 626 25 5.70 5920 86564 76,788 1 1 41200 0 0 300 56,110 150 640 26 6.20 5600 84821 65,316 1 1 35600 0 0 300 50,351 140 800 27 6.20 5920 77443 65,046 1 1 38000 0 0 300 49,776 200 815 28 5.60 6080 93370 80,599 1 1 38700 0 0 300 54,001 160 840 29 7.40 5760 88503 75,399 1 1 31800 600 0 200 54,844 170 810 30 6.70 8640 85220 74,837 1 1 0 7500 0 300 51,430 150 745 31 6.40 3360 84753 73,893 1 1 0 7800 0 300 50,758 150 755 AVE. 6.60 5734 86016 72220 35310 52320 161
H2S Readings
DEC WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 5.40 35 76,667 65,443 1 1 0 7200 0 300 47,278 150 745 101 2 6.50 34 80,426 65,770 1 1 0 6800 0 300 50,062 180 800 101 3 6.30 36 79,214 61,574 1 1 0 6400 0 300 49,523 215 815 109 4 6.12 33 86,260 69,653 1 1 0 7000 0 200 52,155 175 800 109 5 5.88 30 76,468 65,000 1 1 24,900 1600 0 300 68,683 175 821 124 6 5.20 37 92,062 76,249 1 1 38,200 0 0 300 29,299 200 532 101 7 6.94 38 91,618 76,247 1 1 40,100 0 0 300 56,441 180 635 109 8 6.33 38 81,909 68,138 1 1 36,400 0 0 300 46,111 150 850 117 9 6.21 38 83,470 67,966 1 1 38,100 0 0 300 49,323 180 811 94 10 6.23 37 79,218 67,711 1 1 39,800 0 0 300 52,785 200 813 104 11 6.08 38 82,586 76,238 1 1 35,500 0 0 200 49,576 200 854 109 12 5.99 38 84,315 72,155 1 1 35,300 0 0 300 48,935 200 820 109 13 6.10 36 76,010 62,637 1 1 35,400 0 0 300 43,015 200 810 101 14 5.98 37 72,704 62,712 1 1 37,000 0 0 300 52,953 140 810 109 15 6.55 35 83,110 67,344 1 1 39,100 0 0 300 54,625 150 820 109 16 6.32 36 81,921 63,921 1 1 37,800 0 0 200 37,858 200 820 125 17 6.04 36 76,531 61,723 1 1 38,000 0 0 300 52,720 200 755 72 18 6.06 36 89,864 76,480 1 1 41,100 0 0 300 56,417 100 735 109 19 5.96 33 87,026 73,669 1 1 38,500 0 0 300 54,765 150 805 121 20 6.31 34 92,985 76,024 1 1 40,200 0 0 300 58,932 175 722 115 21 6.76 36 90,465 75,262 1 1 40,900 0 0 200 61,646 125 743 125 22 6.48 33 77,271 65,482 1 1 37,600 0 0 300 51,924 175 831 127 23 6.53 37 66,329 52,622 1 1 39,400 0 0 300 51,474 150 608 109 24 6.89 44 82,261 64,305 1 1 43,500 0 0 300 60,812 150 613 101 25 6.17 36 63,675 56,881 1 1 37,800 0 0 300 55,421 125 850 125 26 6.21 36 88,028 68,836 1 1 38,900 0 0 300 56,073 100 812 117 27 6.17 37 95,932 75,059 1 1 38,500 0 0 300 56,399 125 813 121 28 6.53 37 85,129 68,813 1 1 11,100 500 0 300 56,416 150 825 121 29 6.48 35 90,349 68,403 1 1 34,400 1400 0 200 57,360 175 825 119 30 6.08 39 88,568 78,729 1 1 45,300 0 0 300 60,306 200 844 121 31 7.28 38 79,656 72,285 1 1 31,600 400 0 300 47,126 150 834 125 AVE. 6.26 36 82646 68495 32077 52465 112
Ferrous
Chloride
Gal
Digester Gas Production H2S Readings JAN WWTP
(MGD)
Elec. Usage
(kwh)
Gas Flares Propane to Boiler Flare
Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 6.26 31 77,360 53,017 1 1 39300 300 0 300 45,121 175 830 94 2 6.45 41 91,213 68,239 1 1 11200 5300 0 300 50,013 150 745 94 3 6.51 28 94,347 75,702 1 1 0 8500 0 300 53,384 125 700 109 4 7.11 37 102,227 79,069 1 1 0 9500 0 300 56,252 100 720 113 5 7.63 37 82,136 66,425 1 1 34800 1400 0 200 51,372 150 845 117 6 6.78 34 84,032 64,027 1 1 36800 0 0 300 46,713 125 827 101 7 7.74 42 106,184 75,311 1 1 45800 0 0 300 57,862 175 543 101 8 6.96 39 94,016 73,403 1 1 38000 0 0 300 53,611 150 800 125 9 6.30 39 84,217 60,732 1 1 32500 0 0 300 46,303 125 801 113 10 6.95 38 87,230 68,430 1 1 36200 0 0 300 52,476 125 543 101 11 7.15 42 97,308 74,139 1 1 38300 0 0 300 54,616 100 629 109 12 6.35 32 78,866 62,888 1 1 32500 0 0 300 48,430 125 800 109 13 7.10 41 97,164 73,438 1 1 37900 0 0 300 55,031 200 624 98 14 6.39 35 81,373 70,704 1 1 36800 100 0 300 47,912 175 839 105 15 6.62 36 81,926 70,584 1 1 38500 0 0 300 48,620 150 820 98 16 6.32 31 71,619 62,298 1 1 32900 0 0 200 41,865 150 802 99 17 6.84 35 82,229 67,133 1 1 36300 0 0 300 47,856 175 508 86 18 8.42 40 95,449 77,874 1 1 38300 0 0 400 60,362 200 953 96 19 7.74 37 79,769 68,812 1 1 36400 0 0 300 51,567 175 826 121 20 7.02 38 91,859 69,021 1 1 38900 0 0 300 49,780 200 756 101 21 7.02 38 88,947 75,705 1 1 38800 0 0 300 53,228 200 801 101 22 6.64 37 93,245 70,909 1 1 37400 0 0 300 56,362 200 759 109 23 6.53 38 89,989 79,544 1 1 37400 0 0 300 60,934 225 809 117 24 6.64 35 93,548 78,967 1 1 37600 0 0 300 60,893 225 739 121 25 6.79 39 97,901 81,304 1 1 42700 0 0 300 67,660 225 702 125 26 6.89 36 88,813 78,702 1 1 40300 0 0 300 62,730 250 802 137 27 6.85 37 93,629 75,002 1 1 45000 0 0 300 60,437 250 802 125 28 6.71 35 85,107 72,530 1 1 43800 0 0 300 58,062 300 811 119 29 6.63 35 88,761 74,067 1 1 34600 0 0 300 54,769 250 811 113 AVE. 6.87 37 88982 71310 34448 53594 109
Ferrous
Chloride
Gal
H2S Readings
FEB WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 7.00 32 77,406 59,390 1 1 30400 0 0 300 47,469 225 746 113.1 2 7.12 36 92,389 70,938 1 1 37800 0 0 300 53,059 175 445 101.4 3 7.11 38 108,466 86,091 1 1 42300 0 0 300 62,385 225 500 109.2 4 6.92 39 87,441 72,806 1 1 35700 0 0 300 44,623 225 844 124.8 5 6.71 37 82,911 70,089 1 1 35500 0 0 300 47,190 200 820 97.5 6 7.28 39 81,464 69,546 1 1 36900 0 0 300 55,573 300 751 101.4 7 6.71 38 95,353 78,706 1 1 36100 0 0 300 56,433 250 828 117 8 6.58 37 86,607 72,250 1 1 34000 0 0 300 50,780 225 815 120.9 9 6.55 36 90,095 70,583 1 1 34900 0 0 300 50,629 250 700 109.2 10 6.57 39 92,762 78,175 1 1 37000 0 0 300 54,213 200 730 109.2 11 6.53 32 84,528 66,157 1 1 32100 0 0 200 46,524 300 820 117 12 6.77 37 88,079 74,371 1 1 37800 0 0 400 55,552 300 517 101.4 13 7.05 39 86,963 77,523 1 1 40800 0 0 300 59,770 300 558 124.8 14 6.49 34 83,363 71,758 1 1 33100 0 0 200 50,128 225 825 127.5 15 6.59 34 90,529 73,203 1 1 35400 0 0 300 54,133 200 550 113.1 16 6.57 36 94,953 80,193 1 1 37700 0 0 300 56,934 225 549 124.8 17 7.18 38 93,850 80,017 1 1 38900 0 0 300 56,172 225 639 128.7 18 6.20 34 75,392 65,863 1 1 31600 0 0 200 45,030 225 833 120.9 19 6.85 38 86,470 71,224 1 1 35800 0 0 300 53,830 200 554 101.4 20 7.07 41 94,277 74,653 1 1 36800 0 0 400 65,192 300 609 120.9 21 6.77 37 100,184 82,824 1 1 33300 0 0 200 58,277 200 809 144.3 22 6.49 34 91,467 71,140 1 1 28800 0 0 300 53,495 300 759 132.6 23 6.83 37 100,710 80,652 1 1 34700 0 0 300 62,355 225 555 117 24 6.67 37 86,452 73,169 1 1 34500 0 0 300 58,128 300 620 132.6 25 6.63 38 82,204 70,329 1 1 36900 0 0 300 55,892 300 620 128.7 26 6.63 40 81,427 67,580 1 1 36600 0 0 300 51,804 250 610 117 27 6.53 36 79,464 63,000 1 1 36900 0 0 300 51,593 320 543 117 28 6.73 41 93,866 81,485 1 1 37600 0 0 300 52,333 275 600 113.1 29 6.75 35 76,184 61,746 1 1 30900 0 100 300 46,896 250 753 117 30 6.94 37 82,976 66,959 1 1 32800 100 0 300 49,898 290 646 105.3 31 6.94 39 84,060 71,076 1 1 35900 0 0 300 50,222 290 714 111.15 AVE. 6.77 37 88138 72693 35468 53436 117
Ferrous
Chloride
Gal
H2S Readings
MAR WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
City of Santa Maria Wastewater Treatment Plant Daily Log 2024 Methane to Boiler Sludge Pump
Dig 1 (ft3
) Dig 3 (ft3) Dig 4 (ft3) 1
o 2o 1o
Meter Standby 1
o
Metered (Gallons) Flare ppm Time
1 6.65 36 87,914 71,051 1 1 34,400 0 0 300 51,128 310 756 111.15 2 6.52 34 81,040 67,798 1 1 31,500 0 0 300 43,735 300 752 120.9 3 6.46 33 87,646 68,117 1 1 35,500 0 0 300 52,557 350 551 105.3 4 6.19 39 100,998 81,657 1 1 36,900 0 0 300 60,025 275 619 117 5 7.70 34 81,025 70,467 1 1 31,900 0 0 300 54,636 275 812 140.4 6 6.71 42 89,100 77,400 1 1 34,300 0 0 200 57,972 225 620 121 7 6.73 31 93,345 76,937 1 1 35,100 0 0 400 53,860 225 615 132.6 8 6.61 38 83,228 69,145 1 1 32,000 0 0 200 51,718 200 745 124.8 9 6.42 36 84,075 66,648 1 1 30,800 0 0 300 50,614 225 735 109.2 10 6.50 36 90,898 69,340 1 1 35,300 0 0 300 55,484 300 554 113.1 11 6.90 42 98,733 80,272 1 1 38,500 0 0 300 60,534 300 530 124.8 12 6.37 37 78,603 63,119 1 1 34,300 0 0 300 56,319 225 805 132.6 13 7.68 35 85,308 64,956 1 1 33,900 0 0 300 54,273 200 740 124.8 14 15
16 17
18 19
20 21
22 23
24 25
26 27
28 29
30 AVE. 6.73 36 87839 71301 34185 54066 121
Ferrous
Chloride
Gal
H2S Readings
APR WWTP
(MGD)
Elec. Usage
(kwh)
Digester Gas Production Gas Flares Propane to Boiler Flare Propane
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
JANUARY 2026 / DRAFT FINAL / CAROLLO
CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES
APPENDIX E SUMMARY OF PRIOR POND
REHABILITATION WORK AND
COST ESTIMATES FOR SOIL CLEANING
1 Summary of Prior Pond Rehabiliation Work and Cost Estimates for Soil Cleaning 2 The following assumptions were used to develop the budget costs shown in the table above:
1. Process water for the screening/cleaning operation will be provided to the contractor by the City.
2. The City will identify a laydown and decanting/sludge pond area that can be used.
3. Sludge/ fines can be disposed of on-site and no offsite hauling is anticipated.
4. The contractor would be working at Prevailing Wage rates.
5. The City will have pond(s) dried out so that equipment can traverse bottom of ponds.
6. Mobilization/Demobilization and Set up of screening/cleaning plant estimated at $200,000. Note that this amount has been added to the cost for each pond to provide a conservative cost.
7. Upper 5 feet of pond soil to be processed and placed back in the same pond after screening.
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX F SUMMARY OF PRIOR POND
REHABILITATION WORK AND
COST ESTIMATES FOR SOIL CLEANING
1 Summary of Prior Pond Rehabiliation Work and Cost Estimates for Soil Cleaning 2 The following assumptions were used to develop the budget costs shown in the table above: 1. Process water for the screening/cleaning operation will be provided to the contractor by the City. 2. The City will identify a laydown and decanting/sludge pond area that can be used.
3. Sludge/
fines can be disposed of on-site and no o
Ưsite hauling is anticipated.
4. The contractor would be working at Prevailing Wage rates. 5. The City will have pond(s) dried out so that equipment can traverse bottom of ponds. 6. Mobilization/Demobilization and Set up of screening/cleaning plant estimated at $200,000. Note that this amount has been added to the cost for each pond to provide a conservative cost. 7. Upper 5 feet of pond soil to be processed and placed back in the same pond after screening.
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 8: Biosolids Handling
and Disposal
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 8: Biosolids Handling
and Disposal
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.24 11:21:00-07'00'
Digitally signed by Daniel L. Meacham
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.25 08:39:03-05'00'
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 8/Ch01 Contents
CHAPTER 1 BIOSOLIDS HANDLING AND DISPOSAL
1.1 Introduction 1-1
1.2 Background 1-1
1.3 Current and Future Regulations 1-2
1.3.1 Wastewater Solids Regulations 1-2
1.3.2 Future Trends 1-9
1.3.3 Treatment Implications 1-10
1.4 Biosolids Production by Treatment Alternative 1-10
1.4.2 Comparison of Alternatives 1-12
1.5 Hauling and Disposal Alternatives 1-12
1.5.1 Current Co-Disposal 1-13
1.5.2 E&G Only 1-13
1.5.3 Additional Disposal Options 1-14
1.5.4 Additional Considerations 1-14
1.6 Conclusions and Findings 1-16
Appendices
APPENDIX A TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES
APPENDIX B ISHIGAKI PILOT TESTING REPORT
Tables
Table 1.1 Summary of City's Biosolids Reporting Data (2018-2023) 1-1 Table 1.2 EPA 40 CFR 503 Pathogen Reduction Requirements for Class A and Class B Biosolids 1-4
Table 1.3 EPA 40 CFR 503 Vector Attraction Reduction Requirements for Biosolids 1-4 Table 1.4 EPA 40 CFR 503 Metal Concentration Limits for Beneficial Use of Biosolids 1-5 Table 1.5 Treatment Technologies Considered and the Defined PSRP to Meet Class B 1-6 Table 1.6 Estimated Biosolids Production for Alternatives Producing Sub-Class B Biosolids 1-11
Table 1.7 Estimated Biosolids Production for Alternatives Producing Class B Biosolids 1-11 Table 1.8 Comparison of Biosolid Production of Alternatives 1-12 Table 1.9 Cost of Co-Disposal of Biosolids 1-13
Table 1.10 Cost of E&G Only Disposal of Biosolids 1-13
Table 1.11 Cost of Biosolids Disposal at Synagro Facilities 1-14 Table 1.12 Summary of Biosolids Handling and Disposal Alternatives 1-17 Figures
Figure 1.1 Current Status of County Ordinances Affecting the Use of Biosolids 1-9 VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Abbreviations
ADC alternative daily cover
C Celsius
CCL ceiling concentration limits
CFU colony forming unit
City City of Santa Maria
CPLR cumulative pollutant loading rate
CWEA California Water Environment Association
DWQ Division of Water Quality
E&G Engel and Gray
EPA Environmental Protection Agency
FOG fats, oils, and grease
gpm gallons per minute
kg kilogram
lb/day pounds per day
M million
mg/kg milligram per kilogram
mg/l milligrams per liter
mgd million gallons per day
MLE Modified Ludzak-Ettinger
MMBTU million British thermal units
MPN most probable number
N/A not applicable
O&M operations and maintenance
PCL pollutant concentration limits
PFAS per- and polyfluoroalkyl substances
PFRP processes to further reduce pathogens
PFU plaque forming unit
PR pathogen reduction
PS primary sludge
PSRP processes to significantly reduce pathogens
RWQCB Regional Water Quality Control Board
SB Senate Bill
SKIC Synagro Kern Industrial Center
SRT solids retention time
SWRCB State Water Resources Control Board
TM Technical Memo
TN total nitrogen
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
TS total solids
VAR vector attraction reduction
WAS waste activated sludge
WDR waste discharge requirement
WWTP wastewater treatment plant
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 BIOSOLIDS HANDLING AND DISPOSAL
1.1 Introduction
The City of Santa Maria (City) wastewater treatment plant (WWTP) produces over 3,500 wet tons of Class B biosolids annually, resulting from its existing solids treatment processes. As part of the Phase 1 WWTP expansion project, the City is evaluating several solids treatment configurations to bring the plant into compliance with the new effluent discharge requirements that include reducing the total nitrogen (TN) concentration to below 10 milligrams per liter (mg/L). This chapter provides an overview of biosolids as a byproduct of wastewater treatment and assesses existing and potential future biosolids-related practices and regulations to identify drivers for various solids management approaches. Biosolids handling and disposal methods will be evaluated for each of the liquid treatment alternatives presented in Chapter 1 of Volume 6 in the Master Plan based on its sustainability, cost-effectiveness, and regulation-compliant disposal methods. Technical Memorandum (TM) 2 - Energy and Solids Evaluation for Bardenpho Alternatives (Appendix A) includes detailed assumptions and cost estimates that are referenced in this chapter.
1.2 Background
The existing sludge processing system at the City's WWTP includes gravity thickening, anaerobic digestion, and sludge drying beds. The current anaerobic digestion treatment meets a minimum solids retention time (SRT) of 15 days, which produces a Class B solids product.
Currently, the City disposes of its biosolids at the City's landfill and the Engel and Grey (E&G) composting facility, which are licensed to accept Class B solids for disposal. E&G's composting facility is adjacent to the treatment plant and provides a convenient and economical solution to biosolids disposal. With the exception of E&G, the City's landfill is closer than any current alternative for disposal and has significant cost savings for the City. The City's annual biosolids reporting data from 2018 to 2023 includes the average biosolids production, disposal location, and hauling and tipping fees. In 2023, about 30 percent of the biosolids went to the City landfill, and the remainder was composted. This information is summarized in Table 1.1 together with the annual costs.
Table 1.1 Summary of City's Biosolids Reporting Data (2018-2023) Year
E&G City Landfill
Total Annual
Cost (USD)
Fee
(USD/
Wet Ton)
Annual Cake
Processed
(Wet Tons)
Annual Cost
(USD)
Fee
(USD/
Wet Ton)
Annual Cake
Processed
(Wet Tons)
Annual Cost
(USD)
2019 $33.91 2295.09 $77,826.50 $26.6 1027.21 $27,354.60 $105,181.10 2020 $33.91 2036.26 $69,049.58 $26.63 652.67 $17,380.60 $86,430.18 2021 $33.91 2269.82 $76,969.60 $26.63 316.5 $8,428.40 $85,397.99 2022 $33.91 3320.46 $112,596.80 $26.63 1352.47 $36,016.28 $148,613.07 2023 $33.91 2530.22 $85,799.76 $26.63 996.54 $26,537.86 $112,337.62 Average Annual Cost $110,706.07
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
The wet tonnage of biosolids shown in Table 1.1 is an estimate provided in the City's annual anaerobic digester analysis summary, which assumes a 30 percent moisture content when calculating wet tonnage of biosolids. Due to the favorable weather in Santa Maria, the existing sludge drying beds are able to achieve 70 percent total solids content in dewatered cake.
Looking to the future, several of the liquid treatment alternatives evaluated in Volume 6 of the Master Plan shift biosolids quantity and quality to produce sub-Class B biosolids. Because E&G operates under the General Waste Discharge Requirements for Commercial Composting Operations (Order WQ 2020- 0012-DWQ) by the State Water Resources Control Board (SWRCB), their permit requires that biosolids are treated to a minimum of Class B standards prior to acceptance at the composting facility. The same constraint is true for the City's landfill, requiring the ability to produce a Class B biosolid as a key constraint when evaluating treatment alternatives. Additionally, there is uncertainty regarding the long-term availability of the existing composting facility and landfill as disposal options for the City.
Refer to Appendix A for a detailed summary of current operational practices, historical biosolids volumes, and existing conditions.
1.3 Current and Future Regulations
Assessment of both current and anticipated future regulatory requirements is critical for the development of effective long-term biosolids management alternatives. This section summarizes current regulatory requirements and considerations that impact the operation of the City's WWTP solids processing today, as well as proposed regulations that will impact the facility operations within the planning horizon of the Master Plan. The regulatory summary includes a comprehensive review of the current regulations governing solids treatment and end use. Potential impacts of future regulations are also considered.
1.3.1 Wastewater Solids Regulations
Federal, state, and local regulations determine whether biosolids from wastewater treatment plants can be beneficially used or must be disposed of. At the federal level, biosolids regulations are well established, with few changes anticipated in the planning horizon. In contrast, at the state level, anticipated changes to California's biosolids regulations will influence biosolids management options, making the development and execution of a flexible management program essential. A summary of relevant federal, state, and local regulations is provided in the following sections. The specific relevance of regulations depends on the intended beneficial end use or disposal method, which dictates the level of treatment required and the resulting product classification (Class A, Class B, or Sub-Class B).
1.3.1.1 Federal
Federal, state, and local agencies are responsible for regulating beneficial use/disposal of biosolids. Each agency's required level of treatment varies based on the beneficial use/disposal methods employed.
However, key minimum guidelines are established by the Environmental Protection Agency (EPA) that must be implemented by state and local governments. In California, state and local agencies have developed additional rules, guidelines, and criteria for biosolids management.
In order to implement a long-term biosolids program required by the Water Quality Act of 1987, EPA initiated two rulemakings resulting in the promulgation of 40 CFR 503 (the Rule or Regulation), Standards VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
for the Use or Disposal of Sewage Sludge. The regulation establishes requirements, procedures, operational standards, and management practices for:
Biosolids management in waste discharge requirement (WDR) permits. Implementing federal biosolids permit programs, if a state so chooses. Granting state biosolids management programs primacy over federal program. Land application of sewage sludge (which is biosolids in this context) for beneficial use. Surface disposal in a monofill, surface impoundment, or other dedicated site. Incineration of sewage sludge with or without auxiliary fuel. For additional details on federal regulations that impact treatment and disposal of biosolids generated at Santa Maria WWTP, refer to Chapter 4 of Volume 2 in the Master Plan.
EPA 40 CFR 503 Regulations
The EPA's 40 CFR 503 regulations establish biosolids quality standards based on three parameters:
pathogen reduction (PR), vector attraction reduction (VAR), and pollutant (metals) concentration. The regulation applies to non-hazardous wastewater solids that are applied to land, fired in a sewage sludge incinerator, or placed on a surface disposal site. Based on the three parameters, the EPA classifies biosolids into Class B, Class A, and Exceptional Quality Biosolids.
Pathogen reduction alternatives are designed to reduce the concentration of pathogens (organisms capable of causing diseases pathogens) in biosolids. The 40 CFR 503 Class A and Class B PR requirements for land-applied biosolids are summarized in Table 1.2. For a product to be classified as Class A or Class B, it must meet each of the major bullets outlined in Table 1.2. Sub-Class B biosolids are those that do not meet the minimum requirements of the Class B designation. This can include biosolids that range from untreated to insufficiently treated to meet these minimum requirements. The City's WWTP currently meets PR requirements through anaerobic digestion to produce Class B biosolids.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Table 1.2 EPA 40 CFR 503 Pathogen Reduction Requirements for Class A and Class B Biosolids Class A Class B
Either fecal coliform density in the sewage sludge is less than 1,000 MPN/gram of total solids (dry weight basis). Or the density of Salmonella species bacteria in the sewage sludge is less than 3 MPN/4 grams of total solids (dry
weight basis).
Sewage sludge must be treated and/or meet one of the
following alternatives before us or disposal. For more
details on each treatment alternative, refer to
40 CFR 503.32(a):
1. Thermally treated.
2. High pH-high temperature treatment.
3. Treatment to reduce enteric virus to less than 1 PFU per 4 grams of total dry solids and viable helminth ova to less than one per four grams of total dry solids.
4. Processes to further reduce pathogens (PFRP) include treatment by composting, heat drying, heat treatment,
thermophilic aerobic digestion, beta ray irradiation,
gamma ray irradiation, or pasteurization. Specific
operating conditions for each process have been
specified in 40 CFR 503.32(a).
5. Use of processes equivalent to the above (subject to authority approval).
Comply with site restrictions of land application as specified in 40 CFR 503.32(b)(2), (b)(3), or (b)(4). In summary, these restrictions limit access to animals and the public on sites where Class B material was applied.
Sewage sludge must be treated and/or meet one of the
following alternatives before use or disposal. For more details on each treatment alternative, refer to
40 CFR 503.32(b):
1. Geometric mean of seven samples of treated sewage
sludge collected at the time of use or disposal shall
meet a fecal coliform density of 2 million CFU or
MPN/gram of total solids (dry weight basis).
2. Processes to significantly reduce pathogens (PSRP),
which include aerobic digestion, air drying, anaerobic
digestion, composting, or lime stabilization. Specific
operating conditions for each process have been
specified in 40 CFR 503.32(b).
3. Use of processes equivalent to the above (subject to authority approval).
Notes:
CFU - colony forming unit; MPN - most probable number; PFRP - processes to further reduce pathogens; PFU - plaque forming unit; PSRP - processes to significantly reduce pathogens Vector attraction reduction options are designed to reduce the transport of pathogens by vectors (i.e., flies, mosquitoes, fleas, rodents, and birds) from biosolids to other animals or humans. VAR requirements are summarized in Table 1.3 and include process methods (i.e., chemical or biological reduction [Options 1-8]) or barrier methods (i.e., physically blocking biosolids from vectors [Options 9-10]). The City's WWTP currently meets VAR requirements through Alternative 1 in Table 1.3.
Table 1.3 EPA 40 CFR 503 Vector Attraction Reduction Requirements for Biosolids Alternative No. in
40 CFR 503.33(b) Description
1 Meet 38 percent reduction in volatile solids content. 2 Demonstrate vector attraction reduction with additional anaerobic digestion in a bench-scale unit.
3 Demonstrate vector attraction reduction with additional aerobic digestion in a bench-scale unit. 4 Meet a specific oxygen uptake rate for aerobically digested biosolids. 5 Use aerobic processes at greater than 40 degrees C for 14 days or longer. 6 Alkali addition under specified conditions.
7 Dry biosolids (with no unstabilized solids) to at least 75 percent solids. 8 Dry biosolids (with unstabilized solids) to at least 90 percent solids.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Alternative No. in
40 CFR 503.33(b) Description
9 Inject biosolids beneath the soil surface.
10 Incorporate biosolids into the soil within six hours of application to or placement on the land. 11 Cover biosolids placed on a surface disposal site with soil or other material at the end of each operating day. (Note: only for surface disposal).
12 Alkaline treatment of domestic septage to pH 12 or above for 30 minutes without adding more alkaline material.
Notes:
C - Celsius
Currently, biosolids from the Santa Maria WWTP are not required to be tested for metals for disposal at a composting facility or the City's landfill; however, if alternative disposal options are pursued, metal testing may become required. If required, biosolids must, at a minimum, meet metal concentration limits, referred to as ceiling concentration limits (CCL), to be beneficially used. If land applying, the biosolids must meet either the pollutant concentration limits (PCL) or the cumulative pollutant loading rate (CPLR) limits.
Table 1.4 summarizes the pollutant limits required by 40 CFR 503 to beneficially use biosolids.
Table 1.4 EPA 40 CFR 503 Metal Concentration Limits for Beneficial Use of Biosolids Pollutant EPA CCL mg/kg
Dry Weight Basis
EPA PCL, mg/kg
Dry Weight Basis
EPA CPLR Limit,
kg per hectare
Arsenic 75 41 41
Cadmium 85 39 39
Copper 4,300 1,500 1,500
Lead 840 300 300
Mercury 57 17 17
Molybdenum 75 - -
Nickel 420 420 420
Selenium 100 100 100
Zinc 7,500 2,800 2,800
Applicable to: Land applied material Bulk and bagged material Bulk material Notes:
kg - kilogram; mg/km - milligram per kilogram
In addition to the requirements above, 40 CFR 503 provides guidance on best practices for land application of biosolids, provides site restrictions for each type of biosolids, and sets the requirements for monitoring, recordkeeping, and reporting. These apply to both the supplier and application of biosolids (which could be a third party).
Class B Biosolids
Class B biosolids are treated with processes intended to significantly reduce, but not eliminate, pathogens.
As such, biosolids may be land applied, but land appliers must also follow application restrictions for Class B biosolids with regard to public contact, animal forage, and production of crops for human VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
consumption. The waiting periods are intended to further reduce pathogens such that they are comparable to Class A. In short, Class B + Management practices = Class A. For example:
Class B biosolids may only be applied to sites where there is no possibility of contact with the general public for a period of one year. These sites include specific types of agriculture, land reclamation, landfills, etc.
Crop harvesting, animal grazing, and public access are restricted for a defined period of time until environmental conditions have further reduced pathogens.
Class B biosolids can be produced through the three Alternatives defined in Table 1.2, and in order to be land applied, must also meet VAR and pollutant standards previously defined. As mentioned above, the City's WWTP currently meets Class B through anaerobic digestion. Additionally, the alternatives considered in the Master Plan include several PSRPs as listed in Table 1.2: mesophilic anaerobic digestion, aerobic digestion, and sludge drying beds. Table 1.5 summarizes the requirements of these PSRPs to meet Class B requirements for biosolids.
Table 1.5 Treatment Technologies Considered and the Defined PSRP to Meet Class B Treatment Technology Requirements for Class B
Aerobic Digestion
The process must be operated for at least 40 days at 20 degrees C or at least 60 days at 15 degrees C for single-stage aerobic digestion to meet Class B standards. These times and temperatures can be reduced with staged aerobic digestion.
Mesophilic Anaerobic Digestion The process must be operated between 15 days at 35 to 55 degrees C and 60 days at 20 degrees C to meet Class B standards.
Sludge Drying Beds
The process is required to retain sludge for a minimum of 3 months, where the final month must have an average daily temperature above 0 degrees C.
Sub-Class B Biosolids
Under the 40 CFR 503 rule, Class B is the minimum standard for any land application of biosolids.
Sub-Class B biosolids refers to sludge that has not undergone sufficient treatment to meet Class B standards and may contain high levels of pathogens and VAR potential, therefore making the biosolids not permitted for land application.
One alternative for dealing with sub-Class B biosolids would be to haul it to a facility which can accept and further treat sub-Class B solids through composting. A few of these facilities exist both within California and Arizona, operated under site-specific permits which limit the type and amount of biosolids accepted by each location. Some other Southern California agencies are using this approach, including hauling biosolids to Arizona. However, there are concerns that the new ordinances in both California and Arizona may also prevent acceptance of sub-Class B material at these locations in future. Many composting facilities, including E&G, though they use composting to further treat biosolids, are not specifically permitted to accept sub-Class B biosolids. E&G's operation falls under the General Waste Discharge Requirements for Composting Operations, Order WQ 2015-0121-DWQ, that stipulates Class A, B, and/or Exceptional quality biosolids as a Tier II allowable feedstock - see Appendix 4H in Volume 2, Chapter 4.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Class A Biosolids
Class A biosolids are produced with technologies designed to reduce pathogens to undetectable levels and, therefore, may be beneficially used where contact with the general public is possible (i.e., nurseries, gardens, golf courses, etc.). Class A biosolids can be produced through any of the six defined Alternatives in 40 CFR 503 (Table 8.2). No alternatives were considered within the Master Plan to meet Class A requirements.
1.3.1.2 State
The beneficial use or disposal of biosolids is primarily regulated by California's SWRCB Division of Water Quality (DWQ), and the nine Regional Water Quality Control Boards (RWQCBs or Regional Water Boards).
As required under the Porter-Cologne Act, the SWRCB, along with its nine Regional Water Boards, is principally concerned with protecting existing and future beneficial uses of water, but also addresses the use or disposal of sewage sludge (and biosolids). The City's WWTP is regulated under the Central Coast Regional Water Board.
The treatment and disposal of Santa Maria WWTP biosolids must comply with the SWRCB Order No. 2004-0012-DWQ, General WDRs for the Discharge of Biosolids to Land for Use as a Soil Amendment in Agriculture, Silviculture, Horticulture, and Land Reclamation Activities (2004 General Order). Currently, the City does not land apply biosolids, but if this were to change in the future, then the City would need to comply. The 2004 General Order applies to Class B land application sites of all sizes and Class A Exceptional Quality sites where biosolids will be applied at rates greater than 10 dry tons per acre per year to a field that is larger than 20 acres in size.
The 2004 General Order goes beyond the requirements of 40 CFR Part 503 by requiring additional biosolids testing, soil testing, and groundwater sampling. For such a discharge to be allowed, the biosolids must meet these treatment and testing requirements and must demonstrate capability to be beneficially used as a soil amendment as specified under 40 CFR Part 503. The General Order requires the same pathogen reduction and vector attraction reduction requirements as in 40 CFR Part 503. Refer to Chapter 4 of Volume 2 of the Master Plan for details on the 2004 General Order permit.
CalRecycle oversees and regulates California's solid waste disposal, including the disposal of biosolids with municipal solid waste and the use of biosolids as alternative daily cover (ADC) material at landfills.
Per the existing permits, Santa Maria WWTP is exempt from the requirements of Consolidated Regulations for Treatment, Storage, Processing, or Disposal of Solid Waste in CCR, Title 27, Division 2, Subdivision 1, Section 20005, et seq. The Title 27 exemption is in effect so long as Santa Maria WWTP meets the preconditions for Sewage, Wastewater, Underground Injection, Soil Amendments, and Fully Enclosed Units categories. Biosolids that are land-discharged (disposed), including incineration ash, must also comply with the following regulations:
CCR Title 23, Division 3, Chapter 15.
Title 22, Division 4.5, Chapter 11; California Water Environment Association (CWEA) Manual of Good Practice for Agricultural Land Application of Biosolids.
PFAS Sampling
The state issued Order DW 2020-0015-DWQ in July 2020, which requires WWTPs across the state to conduct per- and polyfluoroalkyl substances (PFAS) sampling of their effluent and biosolids. Per this VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
order, WWTPs must conduct a one-year-long sampling of 31 PFAS analytes in the influent and effluent.
Further, biosolids must be sampled for PFAS and moisture content once during the same year-long sampling period. As of now, Santa Maria has completed a year-long sampling baseline for PFAS constituents.
Senate Bill 1383
CalRecycle Senate Bill (SB) 1383, which became effective on January 1, 2022, requires 50 percent diversion of organics (including wastewater solids and biosolids) from landfills by 2020 relative to 2014 levels and 75 percent diversion by 2025. Historically, both use of wastewater solids as ADC in landfills and land application were considered landfill diversion. However, with the enactment of SB 1383, use of wastewater solids as ADC no longer qualifies as diversion and is considered disposal. This could drive wastewater agencies that currently landfill their biosolids to investigate land application options, development of more anaerobic digestion and composting facilities (both in the public and private sector), increased co-digestion of organics at WWTP having excess anaerobic digestion capacity, and an increase in compost and biosolids products in the market. Furthermore, SB 1383 is expected to overturn county ordinances that overly restrict land application and expand the number of land application sites.
1.3.1.3 Local
At the local level, the Central Coast RWQCB (Region 3) is responsible for rulemaking, permitting, and enforcement of federal and state requirements at the Santa Maria WWTP. As noted in Volume 2, Chapter 4 of the Master Plan, counties across California have developed, or are developing, ordinances governing biosolids land application. This can range from unrestricted land application to banning biosolids completely. Figure 1.1, taken from Volume 2, Chapter 3, shows the current status of county ordinances affecting the use of biosolids. Of significance for this discussion is that currently, there are no regulations/ordinances enacted in Santa Barbara County. This is only one of two counties in Southern California with no regulations. However, the neighboring counties of Kern and San Luis Obispo have a ban on land application of Class B biosolids, and Ventura County requires a conditional use permit. In the future, it is likely to become more and more difficult to apply sub-Class B biosolids that Alternatives 1, 3, and 5 would produce, and potentially even Class B biosolids in and around the Santa Maria area.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
Figure 1.1 Current Status of County Ordinances Affecting the Use of Biosolids To comply with current restrictions, the Master Plan considers alternative biosolids use and/or disposal scenarios that are cost-effective and can operate within the existing WWTP facilities.
1.3.2 Future Trends
Currently, legislation allows for some facilities to accept sub-Class B solids for disposal and composting within California. However, it is important to note that E&G is not one of these facilities. This is a key constraint as it precludes the continued use of E&G for biosolids disposal for several of the evaluated liquid treatment alternatives, which would produce sub-Class B solids.
In addition to E&G, the City has the option to send biosolids to the City's landfill. Though this offers a near-term solution for disposal, legislative initiatives such as SB 1383 and Santa Barbara's Climate Action Plan aim to reduce the portion of biosolids sent to landfills. Over the course of the planning period for this Master Plan, disposal at the landfill may be significantly reduced if not ceased.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Lastly, PFAS chemicals are an emerging concern in both liquid and solids treatment for wastewater.
Although legislation has not been written for PFAS in biosolids, discussion of future regulations has begun at both the state and national level. For the purposes of this Master Plan, it would not be practical to invest in and operate an advanced solids treatment process without knowing whether or not it will meet future unknown regulations. However, it is prudent to plan for adequate space availability on-site near the solids handling facilities to more easily implement a new technology to further process solids to destroy or eliminate PFAS prior to disposal.
1.3.3 Treatment Implications
From a treatment perspective, the legislative trends described above may have a significant impact on the current biosolids regime. Once the implementation of the laws proceed (in particular SB 1383 that requires 75 percent diversion of organics from landfills by 2025 relative to 2014, and the Santa Barbara County Climate Action Plan that targets 85 percent reduction of organic waste by 2035), the City may face a situation where the Santa Maria landfill that receives some WWTP biosolids may no longer accept them for disposal. Further, increased demand for organics diversion by other businesses and individuals may cause strain on the capacity of the existing composting facilities in Santa Maria (such as E&G, the existing composting facility). This may further reduce the ability of Santa Maria to send their biosolids to the local composting operation.
As a result of both previous changes and expected future changes to wastewater solids regulations, the Master plan considered several different alternatives for long-term disposal of biosolids, further described in Section 1.4.
1.4 Biosolids Production by Treatment Alternative
This section provides a brief overview of solids handling for each of the alternatives presented in Chapter 1 of Volume 6 of the Master Plan and the additional alternatives presented in TM 2.
1.4.1.1 Alternatives Producing Sub-Class B Biosolids
The following liquid process alternatives do not include primary clarifiers or digesters and will produce Sub-Class B Biosolids:
Alternative 1: Modified Ludzak-Ettinger (MLE) without Primary Clarifiers. Alternative 3: Oxidation Ditch without Primary Clarifiers. Alternative 5: 4-Stage Bardenpho without Primary Clarifiers. Each of these alternatives includes the following two solids waste streams:
» Waste Activated Sludge (WAS): The excess biomass produced during the secondary treatment process. Largely composed of microorganisms and biological floc with 0.5 percent to 1 percent total solids (TS).
» Secondary scum: floatable solid waste from the secondary clarifiers, including filamentous organisms, foam, and grease.
For these alternatives, only secondary sludge (WAS) is produced, which is then sent to aerated sludge holding tanks for storage prior to dewatering. These treatment alternatives would not reach a Class B level VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
of treatment for the biosolids and would therefore be considered sub-Class B biosolid. Based on the process model, the estimated production of solids for each of these alternatives is shown in Table 1.6.
Table 1.6 Estimated Biosolids Production for Alternatives Producing Sub-Class B Biosolids Alternative 1 Alternative 3 Alternative 5
Primary Sludge Flow, mgd N/A N/A N/A
WAS Flow, mgd(1,2) 0.43 0.48 0.44
WAS Solids Concentration, (%TS)(1,2) 0.60 0.61 0.61
Thickened WAS Flow, mgd N/A N/A N/A
Digested Sludge Flow, mgd N/A N/A N/A
Dewatered Cake, wet tons/day(1) 68 77 70
Dewatered Cake Solids Concentration(%TS)(1) 15 15 15
Notes:
mgd - million gallons per day; N/A - not applicable
(1) Flow and loads based on modeling results for all treatment alternatives presented in Chapter 1 of Volume 3. (2) The WAS flows and loads are based on the modeling results for average daily loading.
1.4.1.2 Alternatives Producing Class B Biosolids
The following liquid process alternatives produce Class B biosolids using one of the methods detailed in Table 1.5:
Alternative 2: Oxidation Ditch with Primary Clarifiers. Alternative 4: 4-Stage Bardenpho with Primary Clarifiers. Alternative 5a: 4-Stage Bardenpho with Aerobic Digestion. Alternative 5b: 4-Stage Bardenpho with Sludge Drying Beds.
Each of these alternatives includes the two solid waste streams listed in Section 1.4.1.1. In addition to WAS and secondary scum, both Alternatives 2 and 4 include:
1. Primary Sludge (PS): The solid materials that settle out of raw wastewater during primary clarification.
This waste stream is largely composed of organic material, fecal solids, and grit with 1 percent to
3.5 percent TS.
2. Primary Scum: Primary scum is similar in nature to secondary scum and consists of a floatable solid waste stream comprised of fats, oils, and grease (FOG) and other buoyant materials poorly suited for settling.
Based on the process model developed as a part of Volume 3 of the Master Plan, the estimated production of solids is shown in Table 1.7.
Table 1.7 Estimated Biosolids Production for Alternatives Producing Class B Biosolids Alternative 2 Alternative 4 Alternative 5a Alternative 5b Primary Sludge Flow, mgd(1) 0.07 0.07 N/A N/A
Primary Sludge Solids Concentration (%TS)(1,2) 3.6 3.5 N/A N/A WAS Flow, mgd(1) 0.20 0.28 0.44 0.44
WAS Solids Concentration, (%TS)(1) 0.61 0.60 0.61 0.61
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
Alternative 2 Alternative 4 Alternative 5a Alternative 5b Thickened Sludge Flow, mgd(3) 0.06 0.07 0.04 0.085
Thickened WAS Solids Concentration (%TS) 6 6.0 6 3
Digested Sludge Flow, mgd(3) 0.06 0.07 0.04 N/A
Digested Sludge Solids Concentration (%TS)(3) 3.2 3.2 3.4(4) N/A Dewatered Cake, wet tons/day 38 42 38 15
Dewatered Cake Solids Concentration (%TS) 20 20 15 70(5) Notes:
(1) Flow and loads based on modeling results for all treatment alternatives presented in Chapter 1 of Volume 3. (2) Although design parameters for the primary clarifiers are the same for both Alternatives 2 and 4, the recycle streams for the overall system are not the same, leading to some variance in primary sludge solids content. (3) The digested sludge loads are based on model results (thickened primary sludge and thickened WAS). (4) Assumes 50 percent reduction in volatile solids during aerobic digestion with 15 percent solids cake. (5) Assumes 70 percent TS cake based on existing data from the Santa Maria WWTP.
1.4.2 Comparison of Alternatives
Table 1.8 provides a summary and comparison of biosolids production for each of the evaluated alternatives with consideration of biosolids quantity, solids content, solids reduction, hauling volume, and dryness level.
Table 1.8 Comparison of Biosolid Production of Alternatives Alternative
1 Alternative
2 Alternative
3 Alternative
4 Alternative
5 Alternative
5a(1)
Alternative
5b
Dewatered Cake, dry lb/d 20,403 15,281 23,124 16,867 21,105 11,324 21,105 Hauling Volume, wet tons/year 24,824 13,944 28,134 15,391 25,677 13,777 5,502 Dryness Level 15% total
solids
20% total
solids
15% total
solids
20% total
solids
15% total
solids
15% total
solids
70% total
solids
Notes:
lb/d - pounds per day
(1) WAS from the Bardenpho process is sent to aerobic digesters prior to dewatering.
1.5 Hauling and Disposal Alternatives
This section evaluates the logistical, economic, and regulatory feasibility of disposal options for the City's solids handling process at the WWTP. The following solutions for disposal of the dewatered cake, based on the quality of biosolids produced, were evaluated for each of the evaluated alternatives:
1. Continued disposal at both E&G and the City's Landfill, based on a 70:30 percent split, respectively, for biosolids disposal destination based on data from 2018-2023.
2. Disposal of all biosolids at E&G.
3. Disposal of biosolids with a third-party processing facility like Synagro at either their South Kern Industrial Center (SKIC) or Liberty Composting facilities in California, both of which have capacity to accept 100 percent of the City's projected biosolids.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
1.5.1 Current Co-Disposal
The City currently operates a series of gravity thickeners, anaerobic digestors, and sludge drying beds to produce Class B solids. Approximately 75 percent of the dried solids are then sent to an off-site composting facility, and the remainder is sent to the Santa Maria landfill. In order to continue the method of co-disposal of biosolids, the solids processing facilities must produce a Class B biosolid to be accepted at E&G. Therefore, only Alternatives 2, 4, 5a, and 5b were considered for continuing this disposal alternative. Table 1.9 summarizes the estimated costs associated with disposal of Class B biosolids for these alternatives.
Table 1.9 Cost of Co-Disposal of Biosolids
Current Co-Disposal (2023)Alternative
2 Alternative
4 Alternative
5a
Alternative
5b
E&G Annual Cake Disposal (Wet Tons) 2,530 9,760 10,774 9,644 3,852 E&G Annual Cost(1) $85,800 $330,977 $365,340 $327,031 $174,564 City Landfill Annual Cake Disposal (Wet Tons) 997 4,183 4,617 4,133 1,651 City Landfill Annual Cost(2) $26,538 $111,395 $122,960 $110,066 $43,957 Total Annual Cost $110,707 $442,372 $488,300 $437,097 $174,564 Notes:
(1) Fee derived from current City rates at E&G. Fee = $33.61 USD/Wet Ton. (2) Fee derived from current City rates at Landfill. Fee = $26.63 USD/Wet Ton.
Maintaining the use of both the Landfill and E&G for Class B biosolids disposal will provide the lowest annual cost. Though this offers a near-term solution for disposal, legislative initiatives such as SB 1383 and Santa Barbara's Climate Action Plan aim to reduce the portion of biosolids sent to landfills. Over the course of the planning period for this Master Plan, disposal at the landfill may be significantly reduced, if not ceased.
1.5.2 E&G Only
In order for Santa Maria's WWTP to only use the E&G composting facility for disposal of biosolids, Class B biosolids or higher must be produced. Like the Co-Disposal options, only Alternatives 2, 4, 5a, and 5b have the ability to use this alternative, as they use anaerobic digestion to produce Class B biosolids.
Table 1.10 summarizes the estimated costs associated with disposal of Class B biosolids to E&G only for each of the alternatives.
Table 1.10 Cost of E&G Only Disposal of Biosolids
Alternative 2 Alternative 4 Alternative 5a Alternative 5b E&G Annual Cake Disposal (Wet Tons) 13,944 15,391 13,777 5,502 E&G Annual Cost(1) $472,824 $521,914 $467,187 $186,581
Notes:
(1) Fee derived from current City rates at E&G. Fee = $33.61 USD/Wet Ton.
When compared to disposal of biosolids at E&G as well as the City's landfill, similar to current operations, the disposal of all Class B biosolids at E&G would result in a slightly higher annual disposal cost across all alternatives. With only one location for the disposal of biosolid, operations are simplified; however, VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
because E&G is privately owned and operated, there is some uncertainty regarding the longevity of E&G as a disposal option.
1.5.3 Additional Disposal Options
Additional biosolids disposal methods are available and were considered as part of the Master Plan.
However, most options require additional biosolids treatment to produce Class A biosolids. The higher cost to achieve Class A biosolids is not practical for the City to pursue, so only disposal options for Class B or sub-Class B biosolids were considered.
Many large wastewater treatment plants send biosolids to a third-party facility for further processing.
Synagro, a nationwide biosolids and residuals management company, is a third-party processing facility that accepts sub-Class B biosolids. They have two locations, Liberty and SKIC, that are close to the City's service area and can accept 100 percent of the City's projected biosolids. Synagro further processes the biosolids and land applies it on a number of Synagro-owned sites. Because third-party processing facilities can accept sub-Class B biosolids, the option to dispose of biosolids at a Synagro facility was considered for all the evaluated alternatives. Table 1.11 summarizes the estimated cost associated with the disposal of biosolids at Synagro.
Hauling sub-class B biosolids to a Synagro facility, which is the only location that will accept sub-class B currently, will have the highest annual cost.
Table 1.11 Cost of Biosolids Disposal at Synagro Facilities Alternative
1 Alternative
2 Alternative
3 Alternative
4 Alternative
5 Alternative
5a
Alternative
5b
Synagro Annual Cake Disposal
(Wet Tons) 24,824 13,944 28,134 15,391 25,677 13,777 5,502 Synagro Annual Cost(1) $1,823,295 $1,024,151 $2,066,454 $1,130,480 $1,885,988 $1,011,939 $404,140 Notes:
(1) Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities.
Fee = $73.45 USD/Wet Ton.
1.5.4 Additional Considerations
Santa Maria WWTP solids processing facilities include sludge drying beds that receive solids flow from the existing anaerobic digesters and assist in producing Class B biosolids. Due to the favorable weather in Santa Maria, the existing sludge drying beds can be used seasonally for post-mechanical dewatering. For the alternatives evaluated that produce Class B biosolids, the existing sludge drying beds can provide 6 weeks of cake storage for times when the composting facility cannot take the biosolids right away and can provide additional drying in the dry season, offsetting hauling costs.
For the alternatives that produce sub-Class B biosolids, the existing sludge drying beds can be used to produce Class B biosolids by requiring a minimum 3-month retention time. Alternative 5b, further described in TM 2, evaluated the option of using sludge drying beds to produce Class B biosolids. The minimum number of sludge drying beds will require eliminating approximately 29 acres of existing percolation ponds, making this option undesirable and was not further considered.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
1.5.4.1 Screw Press Pilot Testing
The City pursued pilot testing of an Ishigaki screw press from September 8th through September 12th of 2025. Overall, the testing went well, and the dewatered cake achieved exceptional dryness with the existing digested sludge. Below is a summary of the overall findings and considerations for this pilot testing effort.
Summary of Pilot Testing:
Dewatering Unit: Ishigaki Mobile Pilot Testing Unit:
» Ishigaki ISGK-A-0305 dewatering screw press.
» Netzch progressive cavity pump.
» Velodyne Liquid Polymer Blending Unit.
» Endress+Hauser Magnetic Flowmeter.
» Ishigaki conditioning tank, control panel, and 3 polymer injection points. » Capacity: 5-17 gallons per minute (gpm), with a maximum solids loading of 150 lbs dry solids per hour.
Digested Sludge Feed:
» Anaerobically digested sludge from trickling filter process:
69.55 percent volatile solids content (average from lab data). 2.2 percent TS (average from lab data).
Jar testing was initially performed on sludge samples from the Santa Maria WWTP, which showed the C-6285 as the best-performing polymer for the City's current sludge makeup.
This polymer was used for pilot testing the screw press at the WWTP. Polymer dosage ranged from 22 to 35 lbs active/dry ton of digested solids, with cake solids concentrations averaging
27.9 percent. These results are in line with expected performance with easily dewaterable trickling filter sludge. The full report is included as Appendix B - Ishigaki Pilot Testing Report. Pilot Testing Observations and Considerations:
» At a sludge feed rate of 5-17 gpm, the pilot unit was fairly small compared to the units that would be required for permanent installation. Larger units may not provide the same level of efficiency as the smaller unit tested, which would impact performance. » Trickling filter solids are fairly easy to dewater after digestion, so it should not be assumed that the same high-level performance would be achieved with the future digested sludge makeup of the facility once Phase 1 is complete. The combination of primary sludge and waste activated sludge would likely demand higher polymer usage and provide lower cake dryness. The assumed solids concentrations presented previously in this chapter for mechanical dewatering are still recommended values for planning and design purposes.
» Screw presses have limited throughput, so sizing with a factor of safety built into the design capacity of each unit is recommended. Based on our experience, an assumed performance of 65 percent to 75 percent of the manufacturer's stated maximum capacity is recommended to ensure sufficient system capacity is provided.
» For a permanent screw press system, a unit may at times "lose the plug" and no longer be water-tight at the back of the machine. Curbing, drainage, and housekeeping provisions should be provided to account for these occurrences.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
» Where possible, specify 316 stainless steel construction as the equipment will be subject to corrosion from hydrogen sulfide or other compounds naturally present in the dewatering process. » Provide positive odor control/ventilation out of the unit, if possible. » Provide locations for polymer injection ahead of the screw press and the floc tank, in addition to those provided by the manufacturer.
» In general, dewatering screw press technology is still a viable selection for mechanical dewatering at the Santa Maria WWTP and can be considered further alongside other technologies, such as belt filter presses, for final selection during preliminary design. It would be good to obtain feedback from agencies that use this technology before making a final decision on the selection of dewatering technology.
1.6 Conclusions and Findings
The following is a summary of key findings from cost, regulatory, and operational standpoints:
Alternatives 1 (MLE with extended aeration, no Primary Clarification or Digestion) and Alternative 3 (Oxidation Ditch without Primary Clarification or Digestion) will produce sub-Class B biosolids that can only be disposed of at a third-party processing facility like Synagro. These alternatives offer limited disposal flexibility and a high annual cost that is more than the City's current costs for biosolids disposal.
Alternative 2 (Oxidation Ditch with Primary Clarification and Anaerobic Digestion) will produce Class B biosolids that can be disposed of using the current co-disposal methods. Alternative 4 (Bardenpho Activated Sludge with Primary Clarification and Anaerobic Digestion) will produce Class B biosolids that can be disposed of using the current co-disposal methods. Such biosolids can be used as a feed to additional solids processing systems to produce a higher class of biosolids and/or treatment to achieve future PFAS regulations. This alternative provides the best balance of cost, compliance, and flexibility.
Alternative 5 (Bardenpho Activated Sludge without Primary Clarification and Digestion) offers limited disposal flexibility as it will produce a sub-Class B biosolid that will have to be disposed of by hauling to a Synagro facility for third-party processing. The annual cost for this option would be $1.9 million, which is more than one million per year more than the City's current costs for biosolids disposal.
Alternative 5a (Alt 5 with use of Aerobic Digestion) will produce a Class B biosolid to provide more flexibility in biosolid disposal options. The construction capital cost impact of producing Class B solids as part of Alternative 5a is approximately $59 million to add sufficient thickening and digestion capacity. This alternative will have greater capital costs than both Alternatives 4 and 5, in addition to higher solids disposal costs than Alternative 4. This solution to produce Class B solids is sub-optimal and does not merit further consideration unless other non-economic factors rule out Alternatives 4 and 5.
Alternative 5b (Alt 5 with use of Drying Beds) will produce a Class B biosolid by using sludge drying beds as the sole means of dewatering. Currently, there is a desire from the City to move away from drying beds as the sole means of dewatering due to capacity issues during wet weather months and to provide site space for the new wastewater treatment facilities. Alternative 5b exacerbates this issue by requiring an additional 29 acres of sludge drying bed area. Although this alternative would VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
result in the lowest biosolids disposal cost, it is considered to be impractical based on the significant area required, the need to relocate existing percolation ponds to accommodate sufficient drying beds, and the significant operations and maintenance (O&M) costs in operating the drying beds.
Accordingly, Alternative 5b was not considered further.
Table 1.12 summarizes the biosolids handling and disposal alternatives presented in this chapter.
Table 1.12 Summary of Biosolids Handling and Disposal Alternatives Alternative Biosolid Quality Available
Disposal Option
Estimated Annual Biosolids Disposal Cost
($ 000)(1)
Estimated
Project Cost
($ M)
1 Sub-Class B Synagro $1,823 $501M
2 Class B
Co-Disposal
E&G Only
Synagro
$442 - $1,024 $516M
3 Sub-Class B Synagro $2,066 $515M
4 Class B
Co-Disposal
E&G Only
Synagro
$488 - $1,130 $483M
5 Sub-Class B Synagro $1,886 $516M
5a Class B
Co-Disposal
E&G Only
Synagro
$437 - $1,012 $575M
Notes:
M - million
(1) Fees derived from current City rates (hauling and disposal) at the City's landfill and E&G. Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting).
Based on the evaluation of biosolids production by treatment alternative described in this chapter, maintaining Class B production capability to preserve low-cost, local disposal options is recommended.
Alternative 4, which features a 4-stage Bardenpho activated sludge process with primary clarifiers and anaerobic digesters, is expected to have the lowest long-term O&M cost and provides the best balance of cost, compliance, and flexibility.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A TM 2 - ENERGY AND SOLIDS EVALUATION
FOR BARDENPHO ALTERNATIVES
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 2
Energy and Solids Evaluation for Bardenpho
Alternatives
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 2
Energy and Solids Evaluation for
Bardenpho Alternatives
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.23 07:52:53-07'00'
Digitally signed by Daniel L. Meacham
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.23 09:56:56-05'00'
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/TM02/TM02 Contents
TM 2 ENERGY AND SOLIDS EVALUATION FOR BARDENPHO
ALTERNATIVES
2.1 Overview 2-1
2.1.1 Background and Purpose 2-1
2.1.2 Alternative 4 Overview: 4-Stage Bardenpho With Primary Clarifiers and Anaerobic Digesters 2-1
2.1.3 Alternative 5 Overview: 4-Stage Bardenpho Without Primary Clarifiers 2-2
2.2 Addressing Question 1: Energy Recovery Analysis 2-4
2.2.1 Existing Digester Gas System 2-4
2.2.2 Historical and Future Digester Gas Production 2-5
2.2.3 Cogeneration and Energy Estimates 2-6
2.2.4 Operations and Maintenance Cost Summary 2-8
2.2.5 Capital Cost Impacts 2-9
2.2.6 Biogas Beneficial Use Considerations 2-9
2.3 Question 2: Biosolids Disposal Options for Sub-Class B 2-10
2.3.1 Regulatory Constraints 2-10
2.3.2 Existing Solids Treatment 2-11
2.3.3 Alternative 4 - Bardenpho With Anaerobic Digestion 2-12
2.3.4 Alternative 5: Bardenpho Without Anaerobic Digestion 2-13
2.3.5 Alternative 5a: Bardenpho With Aerobic Digestion 2-13
2.3.6 Alternative 5b: Bardenpho With Sludge Drying Beds 2-14
2.3.7 Capital Cost Impacts 2-16
2.3.8 Biosolids Disposal Considerations 2-18
2.4 Overall Summary and Conclusions 2-18
Tables
Table 2.1 Average Monthly Digester Gas Production and Yield (2018-2024)(1) 2-5 Table 2.2 Phase 1 Expansion Anaerobic Digester Design Criteria 2-5 Table 2.3 Flaring and Boiler Heat Recovery Using Biogas to Replace Propane Heating 2-7 Table 2.4 Gas Engine Specifications Used for Analysis 2-7 Table 2.5 Savings from Electrical Power 2-8
Table 2.6 Thermal Power Savings 2-8
Table 2.7 Gas Flared and Utilized under Each Scenario 2-8 Table 2.8 O&M Cost Comparisons 2-9
Table 2.9 Summary of City's Biosolids Reporting Data (2018-2023) 2-11 Table 2.10 Estimated Biosolids Production for Alternative 4 2-12 Table 2.11 Comparison of Class B Biosolids Disposal Costs for Alternative 4 2-12 Table 2.12 Estimated Biosolids Production for Alternative 5 2-13 Table 2.13 Anticipated Annual Cost for Disposal of Sub-Class B Biosolids to Synagro 2-13 TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 2.14 Summary of Biosolid Production for Alternative 5a(1) 2-13 Table 2.15 Summary Estimated Annual Class B Biosolids Disposal Costs for Alternative 5a 2-14 Table 2.16 Summary of Biosolid Production for Alternative 5b(1) 2-14 Table 2.17 Summary Estimated Annual Class B Biosolids Disposal Costs for Alternative 5b 2-16
Table 2.18 O&M and Capital Cost Summary and NPV 2-20
Figures
Figure 2.1 Alternative 4 With Primary Clarifier Process Schematic 2-2 Figure 2.2 Alternative 5 Without Primary Clarifiers Process Schematic 2-3 Figure 2.3 Current Status of County Ordinances Affecting the Use of Biosolids 2-3 Figure 2.4 Alternative 5b Would Require Eliminating About 29 Acres of Existing Percolation Pond Area 2-15
Figure 2.5 Impact of Alternative 5b on the Additional Pond Area (Purple) Required East of Black Road 2-17
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
TM 2 ENERGY AND SOLIDS EVALUATION FOR
BARDENPHO ALTERNATIVES
2.1 Overview
2.1.1 Background and Purpose
The City of Santa Maria (City) is in the process of selecting the preferred treatment configuration for the upcoming Phase 1 wastewater treatment plant (WWTP) expansion to bring the plant into compliance with the new effluent discharge requirements that include reducing the total nitrogen concentration to below 10 milligrams per liter (mg/L). In a workshop with the City on November 6, 2024, the liquid stream treatment alternatives were narrowed down to two configurations that incorporate the Bardenpho activated sludge process for achieving nitrogen removal. One configuration includes the use of primary treatment and anaerobic digestion (Alternative 4) and the other does not include either primary treatment or anaerobic digestion (Alternative 5).
The purpose of this Technical Memorandum (TM) is to evaluate the two Bardenpho process alternatives from an energy and biosolids perspective, and to provide technical justification for selection of one of the process treatment alternatives for the Phase 1 project. This TM will consider operations and maintenance (O&M) costs, regulatory requirements, and project feasibility.
In particular, this memorandum will be divided into two areas of discussion, Energy and Biosolids. The overarching questions to be addressed are:
Question 1: What energy cost savings are possible with Alternative 4 when utilizing a cogeneration (cogen) system?
Question 2: What are the options for biosolids disposal available with Alternative 5 which does not include anaerobic digestion?
Before addressing these questions, an overview for the two process alternatives is provided as background.
2.1.2 Alternative 4 Overview: 4-Stage Bardenpho With Primary Clarifiers and Anaerobic Digesters
Alternative 4 includes a Bardenpho aeration basin process that incorporates upstream primary clarifiers and solids stabilization in anaerobic digesters. As can be seen in the simplified process schematic in Figure 2.1, primary and secondary sludge is generated and sent to a solids processing system. For solids processing, this alternative includes co-thickening of both primary sludge and waste activated sludge (WAS), anaerobic digestion of thickened sludge, and mechanical dewatering of the digested sludge to produce Class B material for disposal.
This approach is similar to the existing process at the WWTP which produces Class B Biosolids through use of gravity thickening, anaerobic digestion and sludge drying beds. Currently, final disposal of the TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
majority of the Class B material is to the nearby composting facility (operated by Engel and Gray, Inc. [E&G]), with about a quarter of the biosolids going to the City's landfill operation.
Figure 2.1 Alternative 4 With Primary Clarifier Process Schematic
2.1.3 Alternative 5 Overview: 4-Stage Bardenpho Without Primary Clarifiers Alternative 5 includes a Bardenpho aeration basin process that does not incorporate upstream primary clarifiers or downstream anaerobic digesters. In this alternative, as can be seen in the simplified process schematic in Figure 2.2, only secondary sludge is produced, which is then sent to aerated sludge holding tanks for storage prior to dewatering. The sludge storage tank volume for this alternative provides only sufficient capacity to accommodate three days of storage, allowing for holiday weekends without the need for dewatering operations. This treatment approach would not reach a Class B level of treatment for the biosolids.
As noted in Volume 2, Chapter 4 of the Master Plan, counties across California have developed, or are developing, ordinances governing biosolids land application. This can range from unrestricted land application to banning biosolids completely. Figure 2.3, taken from Volume 2, Chapter 3, shows the current status of county ordinances affecting the use of biosolids. Of significance for this discussion is that currently, there are no regulations/ordinances enacted in Santa Barbara County. This is only one of two counties in Southern California with no regulations. However, the neighboring counties of Kern and San Luis Obispo have a ban on land application of Class B biosolids, and Ventura County requires a conditional use permit. In the future, it is likely to become more and more difficult to apply sub-Class B biosolids that Alternative 5 would produce, and potentially even Class B biosolids in and around the Santa Maria area.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3
Figure 2.2 Alternative 5 Without Primary Clarifiers Process Schematic Figure 2.3 Current Status of County Ordinances Affecting the Use of Biosolids TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4
One alternative for dealing with sub-Class B biosolids would be to haul it to a facility which can accept and further treat sub-Class B solids through composting. A few of these facilities exist both within California and Arizona, operated under site-specific permits which limit the type and amount of biosolids accepted by each location. Some other Southern California agencies are using this approach, including hauling biosolids to Arizona. However, there are concerns that the new ordinances in both California and Arizona may also prevent acceptance of sub-Class B material at these locations in future. Another alternative would be to add additional solids processing to the Alternative 5 treatment train to produce Class B biosolids, as discussed below.
2.1.3.1 Alternative 5a and 5b: Class B Solids Without Anaerobic Digestion Alternative 5a follows the same treatment approach as Alternative 5, however the waste solids from the aeration basins would be mechanically thickened and then processed in open aerobic digesters prior to dewatering. Aerobic digesters are essentially large aeration basins which allow the sludge to age over a long detention time. To meet Class B, sufficient aerobic digester volume that allows for a minimum 40-day retention time with one of the largest aerobic digester tanks out of service is required. This will produce Class B biosolids without the need for anaerobic digesters.
A second alternative (Alternative 5b) would be to use sludge drying beds to retain the solids long enough to reach a Class B biosolids.
Further discussion on these sub-alternatives is presented later in this TM.
2.2 Addressing Question 1: Energy Recovery Analysis
Question 1: What energy cost savings are possible with Alternative 4 when utilizing a cogen system?
As noted, Alternative 4 includes anaerobic digesters, which will produce biogas. A cogen system using internal combustion engines (IC Engines) to generate heat and electrical power was used for this preliminary analysis. The evaluation considered the anticipated biogas production, digester heating requirements, the WWTP power consumption, and monthly O&M costs.
The analysis also compares the costs/savings for the scenario where the City continues to flare excess digester gas, which is not used in the hot water boilers.
2.2.1 Existing Digester Gas System
The City currently operates a gas flaring and boiler system. There are two hot water boilers on-site, the primary boiler, Boiler No. 1, burns digester gas with propane gas as a backup while the standby unit burns only propane. Gas produced by the anaerobic digesters is sent to Boiler No. 1 as the primary heat source for the hot water system which heats the anaerobic digesters to 35°C. The standby propane boiler (Boiler No. 2) is only utilized when Boiler No. 1 is out of service. The boilers typically do not operate simultaneously, except during digester startup. Any excess gas not used by the boilers to maintain the temperature is flared. Waste Gas Flare 1 and 2 burn excess digester gas and are ignited by a propane pilot. Currently, approximately 22 percent of the gas, about 24.6 standard cubic feet per minute [scfm], is sent to the boiler, and the remaining 78 percent is flared. This means there is significant potential for energy recovery using a cogen system.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5
In addition to purchasing propane used for heating, the City purchases electricity to power the facility from Pacific Gas and Electric (PG&E). The costs associated with electric delivery are based on demand and energy charges. The demand charge is set by the peak amount of instantaneous power required by the City (all the lights are turned on at once), whereas the energy charge describes the total amount of electricity utilized over time (leaving the lights on all day). The City can reduce the power costs by both reducing the peak demand required by the facilities, or by reducing overall energy consumption over time. There are time-of-use considerations as well. Winter purchases at night are cheaper than summer purchases during the afternoon. As such, when comparing cogen and flaring alternatives, understanding how the costs are reduced is directly linked to how facility demand and energy consumption is reduced.
2.2.2 Historical and Future Digester Gas Production
The City tracks the performance of its anaerobic digesters on a monthly basis. The City also tracks the amount of biogas produced, the inflow of solids, and the amount of volatile solids reduced by the process. There are three operational digesters at the City of Santa Maria's WWTP, one of which is a standby.
Table 2.1 summarizes the average amount of gas produced on a monthly basis, and the average specific yield (gas CH3 produced/pound of volatile suspended solids [VSS] removed) of the digesters since 2018.
Table 2.1 Average Monthly Digester Gas Production and Yield (2018-2024)(1) Digester VSS Removal Efficiency Monthly Biogas Produced (ft3) [cfm]
Biogas Yield
(ft3 of Gas Produced/lb VSS removed)
Digester No. 1 57% 2,461,000 [57.0 cfm] 12.9
Digester No. 3 56% 2,040,000 [47.2 cfm] 19.3
Notes:
cfm - cubic feet per minute; ft3 - cubic feet; lb - pound (1) Includes 2024 data to September 2024.
Using historically observed yields and the currently developed preliminary design criteria for Alternative 4, the amount of VSS destruction and the future digester gas production can be estimated.
Table 2.2 highlights the design criteria of the future Phase 1 digestion facilities for Alternative 4 derived from the process model presented in TM 1.
Table 2.2 Phase 1 Expansion Anaerobic Digester Design Criteria Design Criteria Estimated VSS Loading From PS and
Thickened WAS (lb/day)
Future Digester Volume
(ft3)
Anticipated Biogas Production
(cfd) [cfm]
Digestion System 32,225 173,780 192,000 to 275,000
[133 to 190 cfm]
Notes:
cfd - cubic feet per day
Using the yield values from Table 2.1, and the volatile solids loading values in Table 2.2, the future amount of gas produced by the Alternative 4 digesters may be estimated.
The projected amount of biogas produced for Alternative 4 under Phase 1 conditions is estimated to be between 192,000 and 275,000 cfd [190 cfm], at the start and end of Phase 1, respectively. Assuming a TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
60 percent methane concentration and standard conditions (600 BTU/scf), the energy content inherent in that quantity of gas is between 116 and 165 million British thermal units (MMBTU)/day.
2.2.3 Cogeneration and Energy Estimates
Given the future energy available for digester gas and energy recovery activities, it is possible to estimate the energy that can be re-used thermally (to reheat the digesters), and electrically (for sale or for use elsewhere in the plant).
For this analysis, two scenarios were compared. The first considers a "no biogas utilization" approach that would use a boiler system with propane as the primary fuel source. Note that in the Phase 1 project, the existing boiler (around 20 years old now) would be replaced under this scenario. This would set a baseline cost for digester heating without biogas use. The second scenario analyzes a modular IC Engine approach.
The gas engine manufacturer used for the analysis was JenBacher, and specifically their model J312 Modular Gas Engine.
The existing boiler system is sticker-rated at 88 percent efficiency, but was down-rated for the purposes of this assessment to 85 percent efficiency.
It is assumed that any excess biogas not utilized by the alternatives will need to be flared.
2.2.3.1 Boiler and Flaring System Analysis
This scenario assumes that a boiler and flaring system will be provided as part of the Phase 1 expansion to replace the aging boiler and flares. The scenario compares the cost savings of reusing the biogas compared with utilizing propane as fuel for the boilers. This scenario attempts to quantify the effect of keeping the existing infrastructure configuration (with new equipment) while flaring the remainder of the gas. The difference in operational cost savings will be developed based on the cost of propane.
Based on the heating projections for two digesters, it is estimated that 27 MMBTU/day of heating is required at the design flows in the Phase 1 expansion. A third digester would be provided as standby, but would not be heated until put into service. This corresponds to a requirement of 45,000 cfd of digester biogas.
As such, the comparison will compare the cost of re-using the digester biogas vs heating the digesters with propane only.
It is important to note that the Air Pollution Control District (APCD) permit currently allows for 478,000 cfd of flaring. This is allowable under the current air pollution permit. The permit is re-evaluated triennially.
The plant currently flares between 115,00 and 135,000 cfd, well within the permit limit.
In this case, the actual heating requirements for the system are needed. The monthly heating requirement for the digesters in 2023 averaged 19.2 MMBTU/day. As mentioned, the future heating requirements at the Phase 1 design conditions are estimated at 27 MMBTU/day.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7
Table 2.3 summarizes the potential cost savings by utilizing biogas rather than propane for heating the digesters.
Table 2.3 Flaring and Boiler Heat Recovery Using Biogas to Replace Propane Heating System
Anaerobic Digester Heating
Requirement
(MMBTU/day)
Quantity of Propane Gas
Saved by using Biogas
(cfd)
Monthly Cost Benefit for Using
Digester Gas(1,2)
Current System 19.2 MMBTU/day 213 cfd $22,700
Future System 27 MMBTU/day 303 cfd $32,400
Notes:
(1) Propane costs, including purchase and delivery, is $3.50 per gallon. (2) The cost-benefit for reusing digester gas for the future is based on reducing the propane costs.
As shown in Table 2.3, using digester biogas rather than propane for digester heating would provide significant monthly cost savings. Continual maintenance and reporting requirements detailed under the existing permit would remain.
2.2.3.2 Internal Combustion Engine Analysis
This section analyzes the energy savings that can be achieved with cogen. Discussion of the possible gas systems and the operational and maintenance burden of engines and other alternatives will be provided in Volume 9.
As noted earlier, a JenBacher IC Engine was used for this analysis. The specifications for the engine are shown in Table 1.4.
Table 2.4 Gas Engine Specifications Used for Analysis
Electrical Biogas Consumption
(cfd)
Electrical
Output
(kW)
Thermal
Output
(kW)
Electrical
Efficiency
Thermal
Efficiency
JenBacher J312 248,000(1) 635 kW(1) 752-855 kW 39%(2) 50%(2) Notes:
kW - kilowatt
(1) Assumes 24-hour operation.
(2) To be conservative these values were reduced to 35 percent and 47 percent, respectively in the calculations.
Despite the efficiencies shown in the table, in order to be conservative, this analysis assumed that electrical efficiencies would be 4 percent less than indicated, and thermal efficiencies would be 3 percent less than indicated; that is 35 percent and 47 percent, respectively.
The cost savings analysis relies on two sources:
1. Thermal: The cost savings of not purchasing an equivalent amount of propane to heat the anaerobic digesters (see Table 2.3).
2. Electrical: The cost savings from not purchasing electricity from the grid at purchased rates.
Table 2.5 indicates the electrical power production of the IC engine. It was assumed that the engine would operate for 20 hours a day, to allow for some down-time for maintenance, and that all the energy would be re-used at the plant. The initial estimate of the Phase 1 WWTP electrical power demand for Alternative 4 is approximately 1.2 megawatt (MW).
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
Table 2.5 Savings from Electrical Power
Electrical Power Generated(1) Energy Produced per Day Monthly Cost Savings(2) Annual Energy Saving(3) JenBacher 0.635 MW 12.70 MWh(2) $83,800 $1,005,600
Notes:
(1) The instantaneous power generated is the rated capacity provided by the manufacturer. (2) Summarizes the existing average monthly 2023/24 consumption by the City of Santa Maria WWTP, and assuming 20-hours of engine operation per day.
(3) Cost savings generated by re-using electricity at 23/24 rates, which average $0.22/kWh including delivery and generation costs.
The thermal energy recovered is equivalent to the amount of energy required by the anaerobic digesters (~27 MMBTU). As such, the savings will be the same as shown in Table 2.3 above. In both cases, however, there is excess thermal energy that is generated and must be accounted for. Table 2.6 summarizes the thermal energy generated from the IC engine.
Table 2.6 Thermal Power Savings
Thermal Thermal Power
Generated
Heating Energy
Required for Digesters Excess Heat Annual Cost Savings(1) JenBacher 69.8 MMBTU/day ~ 27 MMBTU/day 42.8 MMBTU/day $388,800 Notes:
(1) Based on monthly saving of $32,400 from Table 2.3.
As shown in Table 2.6, the excess heat also provides significant savings. Implementation of the gas engine system will likely need to provide an additional cooler/boiler as an outlet for excess heat.
Table 2.7 indicates the amount of gas that would be flared or utilized in either the gas boiler approach or the IC engine approach. The maximum biogas anticipated under the Phase 1 design conditions would be 275,000 cfd. At the start of Phase 1 the anticipated gas production would be 192,000 cfd. As mentioned, the existing APCD permit for the City allows for 478,000 cubic feet of flaring a day. Note that APCD regulates emissions from all sources where biogas is burned. Thus, directing gas to be combusted in an engine rather than the flare still counts towards the total emissions. But, in each scenario, the total amount of biogas to be burned is within the existing permit amount.
Table 2.7 Gas Flared and Utilized under Each Scenario
System Alternative Biogas Utilized (cfd) Biogas Flared (cfd) Boiler and Flaring System 45,000 230,000
JenBacher IC Engine 248,0001 27,000
In each alternative, reducing the quantity of biogas flaring is important to maximize the energy that can be saved.
2.2.4 Operations and Maintenance Cost Summary
For the cogen to be viable, the cost savings should be significant enough to offset the increased operations and maintenance burden that would be placed on the plant and their facilities. It would also need to be significant enough to pay off any capital cost requirements on the system.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
The projected monthly O&M cost for Alternative 4 after the Phase 1 expansion, including Class B solids disposal but without co-generation, is $347,500. The additional monthly cost to operate an IC Engine is estimated to be $52,000.
The following Table 2.8 estimates the added monthly O&M cost for operation for each energy recovery system.
Table 2.8 O&M Cost Comparisons
Estimated Additional Monthly O&M
Cost for Alternative 4(1) ($)
Estimated Monthly Cost Savings
from Energy Recovery
Net Monthly Cost
Savings
Boiler + Flaring $21,300 $32,400 $11,100
JenBacher Gas Engine $52,000 $117,600 $65,600
Notes:
(1) Gas Engine O&M cost is 0.054 $/kWh based on existing maintenance contracts, and other fuel treatment costs.
The results from this analysis indicate that the energy recovery savings are significant enough to offset the added maintenance burdens that result from operating cogen equipment, and result in a net overall monthly cost saving.
Further, there is potential for the equipment supplier to provide maintenance services on the cogen system and reduce the operational burdens for the City.
2.2.5 Capital Cost Impacts
The construction capital cost impact of including a cogen system as part of Alternative 4 is approximately $20 million. If cogeneration is not implemented there would still be the cost of providing a new boiler to provide redundancy.
Details of the capital cost impacts will be included in Volume 9. However, given the net monthly O&M cost savings shown in Table 2.8, there would be the opportunity to apply such savings towards paying back the capital costs incurred for either approach.
2.2.6 Biogas Beneficial Use Considerations
Based on the above analysis the following conclusions can be made:
1. Alternative 4 is expected to produce between 192,000 and 274,000 cfd of biogas when operating at the start and end of the Phase 1 design conditions, respectively and there are two approaches for making use of the biogas; one utilizes the biogas for digester heating only, and the other would implement a cogen (or similar) system that would produce heat for the digesters as well as renewable electrical power to offset the plant electrical power costs.
2. Under Phase 1 conditions, a daily average of about 530 kW of electrical power could be generated from a combustion engine cogen system, together with more than enough residual heat to heat the digesters.
3. Under Phase 1 conditions, the electrical energy produced by a cogen system would off-set electrical energy purchases from PG&E. The analysis shows that the cost savings from producing electrical energy (530 kW) and heat would be almost $1.4 million annually. This is expected to be greater than the O&M costs ($624,000) associated with operating and maintaining the cogen equipment, resulting in a net positive savings.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
4. Utilizing power and heat from a cogen system offers the following benefits:
a. More sustainable than flaring biogas.
b. Reduces reliance on PG&E for electrical power for a portion of the plant needs. c. Provides an opportunity to receive funding for GHG reduction, as well as tax credits.
5. Adding cogen facilities to Alternative 4 will increase the construction capital cost by approximately $20 million. For Alternative 4 without the cogen approach, the capital cost would increase to cover the cost of providing a redundant boiler. The cost for a new gas flare system is already included in the Alternative 4 cost.
2.3 Question 2: Biosolids Disposal Options for Sub-Class B Question 2: What are the options for biosolids disposal available with Alternative 5 which does not include anaerobic digestion?
Currently, the City disposes of its biosolids at the City's landfill and the E&G composting facility which is licensed to accept Class B solids for composting. This facility is adjacent to the treatment plant and provides a convenient and economical solution to biosolids disposal. However, changing regulatory landscapes and disposal site availability merit consideration when selecting a long-term biosolids treatment approach. Additionally, there is uncertainty regarding the long-term availability of the existing composting facility that receives Class B biosolids from Santa Maria. This evaluation will consider both the existing disposal site and secondary options for disposal for treatment Alternatives 4, 5, and 5a, which can be defined as:
1. Alternative 4: Anaerobic digestion which produces Class B solids.
2. Alternative 5: No digestion which produces sub-Class B solids.
3. Alternative 5a: Aerobic digestion/sludge storage which produces Class B solids.
2.3.1 Regulatory Constraints
Regulations are further discussed in Volume 2, Chapter 4 of the Master Plan, however biosolids quality has a direct impact on where solids can be disposed of which may influence the City's ultimate decision on solids treatment.
Currently, legislation allows for some facilities to accept sub-Class B solids for disposal and composting within California. However, it is important to note that E&G is not one of these facilities. E&G operates under the General Waste Discharge Requirements for Commercial Composting Operations (Order WQ 2020-0012-DWQ) by the State Water Resources Control Board (SWRCB). Their permit requires that biosolids are treated to a minimum of Class B standards prior to acceptance at the composting facility.
This is a key constraint as it precludes the continued use of E&G for biosolids disposal for Alternative 5, which would produce sub-Class B solids.
In addition to E&G, the City has the option to send biosolids to the City's landfill. Though this offers a near-term solution for disposal, legislative initiatives such as SB 1383 and Santa Barbara's Climate Action Plan aim to reduce the portion of biosolids sent to landfills. Over the course of the planning period for this Master Plan, disposal at the landfill may be significantly reduced if not ceased.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
Lastly, PFAS chemicals are an emerging concern in both liquid and solids treatment for wastewater.
Although legislation has not been written for per- and polyfluoroalkyl substances (PFAS) in biosolids, discussion of future regulations has begun at both the state and national level. For the purposes of this Master Plan, it would not be practical to invest in and operate an advanced solids treatment process without knowing whether or not it will meet future unknown regulations. However, it is prudent to plan for adequate space availability on-site near the solids handling facilities to more easily implement a new technology to further process solids to destroy or eliminate PFAS prior to disposal.
2.3.2 Existing Solids Treatment
The existing sludge processing system at the Santa Maria WWTP includes gravity thickening, anaerobic digestion, and sludge drying beds. The current anaerobic digestion treatment meets a minimum solids retention time (SRT) of 15 days, which produces a Class B solids product.
The City's annual biosolids reporting data from 2018 to 2023 includes the average biosolids production, disposal location, and hauling and tipping fees. In 2023, about 30 percent of the biosolids went to the City Landfill and the remainder was composted. This information is summarized in Table 2.9.
Table 2.9 Summary of City's Biosolids Reporting Data (2018-2023) Year
E&G City Landfill
Total Annual
Cost (USD)
Fee
(USD/
Wet Ton)
Annual Cake
Production
(Wet Tons)
Annual Cost
(USD)
Fee
(USD/
Wet Ton)
Annual Cake
Production
(Wet Tons)
Annual Cost
(USD)
2019 $33.91 2295.09 $77,826.50 $26.6 1027.21 $27,354.60 $105,181.10 2020 $33.91 2036.26 $69,049.58 $26.63 652.67 $17,380.60 $86,430.18 2021 $33.91 2269.82 $76,969.60 $26.63 316.5 $8,428.40 $85,397.99 2022 $33.91 3320.46 $112,596.80 $26.63 1352.47 $36,016.28 $148,613.07 2023 $33.91 2530.22 $85,799.76 $26.63 996.54 $26,537.86 $112,337.62 Average Annual Cost $110,706.07
The wet tonnage of biosolids shown in the table above are estimates provided in the City's annual anaerobic digester analysis summary, which assumes a 30 percent moisture content when calculating wet tonnage of biosolids. Due to the favorable weather in Santa Maria, it is possible to achieve this high solids content in dewatered cake, which will contrast with the mechanical dewatering processes in the alternatives discussed herein. If the City chooses to do so, existing sludge drying beds that remain onsite once the new facilities are complete may be used to further dewater cake post-mechanical dewatering.
This benefit may allow for significant financial savings during dry months when the City can store mechanically dewatered cake outside in the drying beds.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-12
2.3.3 Alternative 4 - Bardenpho With Anaerobic Digestion As noted earlier, this alternative includes primary sludge and WAS, both co-thickened and then sent to anaerobic digesters prior to sludge storage and dewatering. This process produces Class B biosolids.
Based on the process model, developed as a part of Volume 3 of the Master Plan, the estimated production of solids is shown in Table 2.10.
Table 2.10 Estimated Biosolids Production for Alternative 4 Units Primary
Sludge
Thickened Primary
Sludge
WAS Thickened
WAS
Digested
Sludge(2)
Dewatered
Cake
Flow mgd 0.07 0.04 0.28 0.03 0.07 0.01
Daily Solids
Production(1)
dry
lbs/day 20,586 19,556 14,005 13,305 17,755 16,867
Percent solids % 3.53 6 0.60 6 3.24 20
Daily Cake Hauling
Weight
wet
tons/day - - - - - 42.2
Cake Volume cu. ft./day - - - - - 1,352
Notes:
mgd - million gallons per day
(1) It is assumed that the mechanical thickening and the mechanical dewatering processes each have a 95 percent solids capture.
(2) It is assumed that the anaerobic digestion process has a 50 percent destruction of volatile solids for both primary sludge and WAS. Primary sludge is assumed to contain approximately 95 percent volatile solids, and WAS is assumed to have approximately 88 percent volatile solids based on the calibrated model.
Multiple solutions for disposal of the dewatered cake exist for this alternative and will be further discussed in Volume 8 of the Master Plan. For the purpose of this evaluation, three alternatives will be compared:
1. Continued disposal at both E&G and the City's Landfill, based on a 70:30 percent split, respectively, for biosolids disposal destination based on data from 2018-2023.
2. Disposal of all biosolids at E&G.
3. Disposal of biosolids with Synagro at either their South Kern (SKIC) or Liberty Composting facilities in California, both of which have capacity to accept 100 percent of the City's projected biosolids.
The following table summarizes the estimated costs associated with disposal of Class B biosolids at 20 percent solids concentration for Alternative 4.
Table 2.11 Comparison of Class B Biosolids Disposal Costs for Alternative 4 No. Disposal Location Fee
(USD/Wet Ton)(1)
Annual Cake Disposal
(Wet Tons)
Subtotal Cost
(USD) Total Annual Cost (USD)
1 E&G $33.91 9,490 $321,803 $488,300 City Landfill $26.63 4,067 $108,307 2 E&G $33.91 13,557 $459,718 $521,914
3 Synagro $73.45 13,557 $995,762 $1,130,480
Notes:
(1) Fees derived from current City rates (hauling and disposal) at the City's landfill and E&G. Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting).
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-13
2.3.4 Alternative 5: Bardenpho Without Anaerobic Digestion This alternative includes only WAS which is sent directly to sludge storage without thickening or digestion, prior to dewatering. This process produces sub-Class B biosolids. Based on the process model, the estimated production of solids is shown in Table 2.12.
Table 2.12 Estimated Biosolids Production for Alternative 5 Units WAS Dewatered Cake
Flow mgd 0.44 0.017
Daily Solids Production(1) dry lbs/day 22,215 21,105
Percent solids % 0.61 15
Daily Cake Hauling Weight wet tons/day - 70.4
Cake Volume cu. ft./day - 2,255
Notes:
(1) It is assumed that the mechanical dewatering processes has a 95 percent solids capture.
Disposal of sub-Class B solids is limited to composting facilities that will accept this product, or further treatment could be provided in order to achieve Class B or better. In order to evaluate Alternative 5 as presented in the November 6th, 2024 workshop, the only disposal alternative applicable for Alternative 5 is disposal with Synagro. Both their SKIC and Liberty Composting locations can accept sub-Class B biosolids in the projected quantity for this alternative.
Table 1.13 summarizes the estimated costs associated with disposal of sub-Class B biosolids at 15 percent solids concentration for Alternative 5.
Table 2.13 Anticipated Annual Cost for Disposal of Sub-Class B Biosolids to Synagro No. Disposal Location Fee
(USD/Wet Ton)(1)
Annual Cake Disposal
(Wet Tons) Total Annual Cost (USD)
1 Synagro $73.45 25,677 $1,885,998
Notes:
(1) Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting).
2.3.5 Alternative 5a: Bardenpho With Aerobic Digestion
Alternative 5a is the same as Alternative 5, with the addition of aerobic digesters. WAS from the Bardenpho process would be sent to aerobic digesters, prior to dewatering. This process produces Class B biosolids by extending the SRT within the aerobic digesters to a minimum of 40 days. This alternative is presented as a compromise by excluding primary clarifiers and anaerobic digesters from the treatment train, while still producing a Class B biosolid which provides greater options for disposal. The estimated solids generation for this alternative are shown in Table 2.14.
Table 2.14 Summary of Biosolid Production for Alternative 5a(1) Units WAS Thickened WAS Digested Sludge Dewatered Cake
Flow mgd 0.44 0.04 0.04 0.01
Daily Solids Production(1) dry lbs/day 22,215 21,105 11,920 11,324 Percent solids % 0.61 6 3.39 15
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-14
Units WAS Thickened WAS Digested Sludge Dewatered Cake
Daily Cake Hauling Weight wet tons/day - - - 37.8
Cake Volume cu. ft./day - - - 1,210
Notes:
(1) Alternative 5a assumes a 50 percent reduction in volatile solids during aerobic digestion with 15 percent solids cake.
With aerated digestion and a Class B biosolids, multiple solutions for disposal of the dewatered cake are once again available for this alternative. For the purpose of this evaluation, three alternatives will be compared:
1. Continued disposal at both E&G and the City's Landfill, based on the same 70:30 percent split respectively for biosolids disposal destination based on data from 2018-2023.
2. Disposal of all biosolids at E&G.
3. Disposal of biosolids with Synagro at either their SKIC or Liberty Composting facilities in California, both of which have capacity to accept 100 percent of the City's projected biosolids.
Table 2.15 summarizes the estimated costs associated with disposal of Class B biosolids at 15 percent solids concentration for Alternative 5a. Costs are higher than for Alternative 5 due to the greater quantity of biosolids requiring disposal.
Table 2.15 Summary Estimated Annual Class B Biosolids Disposal Costs for Alternative 5a No. Disposal Location Fee
(USD/Wet Ton)(1)
Annual Cake Disposal
(Wet Tons)
Subtotal Cost
(USD)
Total Annual
Cost (USD)
1 E&G $33.91 9,644 $327,031 $437,097
City Landfill $26.63 4,133 $110,066
2 E&G $33.91 13,777 $467,187 $467,187
3 Synagro $73.45 13,777 $1,011,939 $1,011,939
Notes:
(1) Fees derived from current City rates (hauling and disposal) at the City's landfill and E&G. Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting).
2.3.6 Alternative 5b: Bardenpho With Sludge Drying Beds Alternative 5b is the same as Alternative 5, except sludge drying beds are used in addition to mechanical dewatering, which allows for the production of Class B biosolids. WAS from the Bardenpho process would be sent to a mechanical dewatering process, prior to further dewatering and a minimum 3-month retention within the sludge drying beds to reduce the water volume removed via evaporation. Similar to Alternative 5a, this alternative is presented as a compromise by excluding primary clarifiers and anaerobic digesters from the treatment train, while still producing a Class B biosolid which provides greater options for disposal. The estimated solids generation for this alternative are shown in Table 2.16.
Table 2.16 Summary of Biosolid Production for Alternative 5b(1) Units WAS Dewatered Cake
Flow mgd 0.44 0.004
Daily Solids Production(1) dry lbs/day 22,215.28 21,105 Percent solids % 0.61 70
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-15
Units WAS Dewatered Cake
Daily Cake Hauling Weight wet tons/day - 15.1
Cake Volume cu. ft./day - 483
Notes:
(1) Alternative 5b assumes a 70 percent TS cake based on existing data from the Santa Maria WWTP.
The area of drying beds required for the minimum 3-month retention time would be greater than the space available on-site when considering the replacement of impacted percolation ponds. Because of this, Alternative 5b assumes that the WAS is thickened in a mechanical dewatering process prior to transfer to the sludge drying beds. This would minimize the sludge drying bed area to about 29 acres. The mechanically thickened sludge is estimated to have 15 percent solids, which would be difficult to pump.
Hauling vehicles would therefore be needed for routine transportation of solids from the mechanical dewatering facility to the drying beds in addition to heavy equipment to spread the sludge within the drying beds. The hauling and spreading equipment would not only increase capital investment, but significantly impact labor demand at the facility to accommodate this treatment approach. Figure 2.4 illustrates the area required for the sludge drying beds under this alternative in comparison to the Phase II facilities, showing that the large area required for sludge drying beds cannot be accommodated without impacting existing percolation ponds. Accordingly, additional percolation pond area would also need to be constructed east of Black Road.
Figure 2.4 Alternative 5b Would Require Eliminating About 29 Acres of Existing Percolation Pond Area TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-16
With the use of sludge drying beds to produce a Class B biosolid, multiple solutions for disposal of the dewatered cake are once again available for this alternative. For the purpose of this evaluation, three alternatives will be compared:
1. Continued disposal at both E&G and the City's Landfill, based on the same 70:30 percent split respectively for biosolids disposal destination based on data from 2018-2023.
2. Disposal of all biosolids at E&G.
3. Disposal of biosolids with Synagro at either their SKIC or Liberty Composting facilities in California, both of which have capacity to accept 100 percent of the City's projected biosolids.
Table 2.17 summarizes the estimated costs associated with disposal of Class B biosolids at 70 percent solids concentration for Alternative 5b. Costs are lower than for Alternative 5a due to the lower quantity of biosolids requiring disposal.
Table 2.17 Summary Estimated Annual Class B Biosolids Disposal Costs for Alternative 5b No. Disposal Location Fee
(USD/Wet Ton)(1)
Annual Cake Disposal
(Wet Tons)
Subtotal Cost
(USD)
Total Annual Cost
(USD)
1 E&G $33.91 3,852 $130,607 $174,564 City Landfill $26.63 1,651 $43,957 2 E&G $33.91 5,502 $186,581 $186,581
3 Synagro $73.45 5,502 $404,140 $404,140
Notes:
(1) Fees derived from current City rates (hauling and disposal) at the City's landfill and E&G. Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting).
2.3.7 Capital Cost Impacts
The construction capital cost impact of producing Class B solids as part of Alternative 5a is approximately $59 million to add sufficient thickening and digestion capacity. This alternative will have greater capital costs than both Alternatives 4 and 5 in addition to higher solids disposal costs than Alternative 4. This solution to producing Class B solids is sub-optimal and does not merit further consideration unless other non-economic factors rule out Alternatives 4 and 5.
Concerning Alternative 5b, the minimum number of sludge drying beds will require eliminating approximately 29 acres of existing percolation ponds, which will require reestablishment on the east side of Black Road. This effectively takes up the vast majority of all the remaining space on this property north of Stowell Road when included with the 6 new ponds already planned for construction during Phase 1.
This also requires construction of the replacement ponds within an area outside of the "favorable area" for percolation, which may require more than 29 acres of land to provide sufficient percolation. Assuming uniform pond size of 7 acres, to achieve the 29-acre minimum replacement, an additional 34 acres of pond area is shown in Figure 2.5 to illustrate the impact of the additional drying beds and associated new percolation ponds. Space limitations would likely become worse during Phase 2 if the same sludge disposal strategy is being applied.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-17
Figure 2.5 Impact of Alternative 5b on the Additional Pond Area (Purple) Required East of Black Road TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-18
2.3.8 Biosolids Disposal Considerations
It's clear that it would be advantageous for the City to continue using both the landfill and E&G for biosolids disposal. However, these may not be long-term options, and the City may be forced to use disposal options located farther from the treatment facility at a much higher disposal cost either within or beyond the current planning horizon of the Master Plan.
Based on the analysis presented, the following conclusions can be made regarding biosolids disposal:
1. Maintaining the use of both the Landfill and E&G for Class B biosolids disposal, or even switching to 100 percent disposal of biosolids to E&G will provide the lowest disposal annual cost ($488,000 to $522,000). This would be achievable with Alternative 4.
2. Hauling sub-Class B biosolids (Alternative 5) to a Synagro facility (the only location that will accept sub-Class B currently) will have the highest annual cost (almost $1.9 million); more than four times higher than the costs associated with Alternative 4.
3. Treating sub-Class B solids to Class B on site with aerobic digestion (Alternative 5a) will have the next highest biosolids disposal cost, but will also incur added costs for power for aeration air required for the aerobic digesters. In addition, there will considerable capital cost (estimated to be >$59 million) associated with providing sufficient aerobic digester volume to achieve the minimum 40-day detention time. Overall, Alternative 5a is expected to have the highest cost.
4. Using sludge drying beds to produce Class B biosolids, Alternative 5b, is challenged by the area required for the sludge drying beds. Currently, there is a desire to move away from drying beds as the sole means of dewatering due to capacity issues during wet weather months. Alternative 5b exacerbates this issue by requiring an additional 29 acres of sludge drying bed area. Although this alternative would result in the lowest biosolids disposal cost, it is considered to be impractical based on the significant area required and the need to relocate existing percolation ponds to accommodate sufficient drying beds. Accordingly, Alternative 5b was not considered further.
2.4 Overall Summary and Conclusions
This TM evaluated the two Bardenpho process alternatives from an energy and biosolids perspective, with the goal to provide technical information to support justification for selection of one of the process treatment alternatives for the Phase 1 project. The two treatment alternatives under consideration are:
Alternative 4 - 4-Stage Bardenpho with Primary Clarifiers and Anaerobic Digesters. Alternative 5 - 4-Stage Bardenpho without Primary Clarifiers and Anaerobic Digesters.
Based on the evaluation presented above, which considered O&M costs, regulatory requirements, and capital cost impacts, the following conclusions can be made:
1. With respect to Alternative 4:
a. Alternative 4 is expected to produce sufficient biogas to support the operation of boiler system to generate hot water to heat the digesters, similar to the existing system, or a cogen system that will produce more than enough heat to heat the anaerobic digesters, and sufficient electrical power to meet about 40 percent of the expected plant electrical load. b. The savings in electrical energy for Alternative 4 with a cogen system is expected to total nearly $800,000 per year and will help to off-set the capital cost of the Phase 1 project.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-19
c. Alternative 4 will produce Class B biosolids that can be disposed of via the current methods. Such biosolids can be used as a feed to additional solids processing systems to produce a higher class of biosolids and/or treatment to achieve future PFAS regulations. d. A cogen system is expected to add about $20 million to the construction cost estimate of Alternative 4 presented at November 6th, 2024 workshop. The non-cogen approach will add $6 million to the construction cost for the inclusion of a replacement boiler.
2. With respect to Alternative 5:
a. Alternative 5 would not produce biogas and therefore recovery of reusable energy would not be an option.
b. Alternative 5 would produce a sub-Class B biosolids. The only option for disposal of this sludge would be hauling it to Synagro with an annual cost of $1.9 million; at least $1.0 million per year more than the City's current costs for biosolids disposal. c. Producing Class B biosolids with Alternative 5 would require the addition of large aerobic digester tanks, Alternative 5a. Such tanks are expected to add almost $60 million to the construction cost and increase the energy demand for the process.
3. Summary of O&M and Capital Costs:
a. Table 2.16 presents a summary of the anticipated annual cost savings, biosolids disposal costs, total O&M costs and updated construction cost estimate for Alternative 4 (with and without cogen), and Alternative 5 and 5a, as well as the 20-year Net Present Value (NPV). b. Alternatives 5 has the highest biosolids disposal costs, followed by Alternative 5a. Alternative 5a has higher biosolids disposal costs than Alternative 4 because the amount of biosolids produced would be greater.
c. Alternatives 5 and 5a have the highest estimated annual O&M cost. d. Alternative 5a has the highest expected construction cost. Alternative 5 has the next highest construction cost.
e. Alternative 4 (without cogen) is expected to have the lowest 20-year NPV, slightly lower than Alternative 4 (with cogen). For the 20-year evaluation it was assumed that the mechanical equipment would be maintained regularly, as part of the O&M cost, but that the boilers and cogen equipment would last for the 20-year period. Alternatives 5 and 5a would have significantly greater NPVs.
4. Alternative 4, either with or without cogen, appears to be a better choice than Alternative 5 or 5a for the Phase 1 project because of the additional energy savings associated with Alternative 4 with cogen.
This alternative is expected to have the lowest long-term O&M cost. However, the higher capital cost of the cogen equipment pushes the 20-year NPV of this alternative higher than the "without cogen" alternative. Potential opportunities to receive funding for greenhouse gas reduction, as well as tax credits could further improve the economic advantage of Alternative 4 with cogen. Designing a system with flexibility to accept a future cogen system, and operating without one in Phase 1, would allow the investment in biogas utilization to be phased and not lock the City into a cogen system that might impact the long-term O&M costs if there are operational issues, or if sufficient tax credits/incentives are not forthcoming.
TM 2 - ENERGY AND SOLIDS EVALUATION FOR BARDENPHO ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-20
Table 2.18 O&M and Capital Cost Summary and NPV
Alternative
Estimated Annual
Biogas Beneficial
Savings
($ 000)
Estimated Annual
Biosolids Disposal Cost
($ 000)(1)
Estimated Annual
O&M Cost
($ 000) (6)
Estimated
Project Cost
($ M)
20-year Net
Present Value
($ M) (7)
4 (w/o cogen) $133(3) $488 - $1,130(4) $4,054 - $4,696 $489M(2) $570M 4 (with cogen) $788 $488 - $1,130(4) $3,398 - $4,041 $507M $575M 5 (sub-Class B) - $1,886(5) $5,324 $516M $585M
5a (Class B) - $437 - $1,012 $4,569 - $5,329 $575M $666M Notes:
M - million
(1) Fees derived from current City rates (hauling and disposal) at the City's landfill and E&G. Synagro provided budgetary costs for hauling and composting, which is the same unit cost for both proposed facilities (SKIC or Liberty Composting). (2) Capital cost does not include capital investment required for resource recovery through full beneficial use of biogas, but assumes utilization of biogas for digester heating. Includes the cost of a new boiler. Further modifications has been made to Alternative 4, detailed in Volume 6, Chapter 6, which are not included here to provide an apples to apples comparison regarding level of treatment between alternatives discussed herein. (3) Digester heating only.
(4) The higher cost ($1,130,480) is for hauling to a Synagro facility. (5) Sub-Class B hauled to Synagro.
(6) Includes the benefit of cost savings due to biogas utilization shown in second column. (7) Assuming the lowest annual operation cost, an annual inflation rate of 3 percent, and a discount rate of 3 percent.
VOLUME 8 / CHAPTER 1: BIOSOLIDS HANDLING AND DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B ISHIGAKI PILOT TESTING REPORT
Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348