3874440 3874460 3874480 3874500 3874520 3874540 3874560 3874580 3874600 3874440 3874460 3874480 3874500 3874520 3874540 3874560 3874580 3874600 733130 733150 733170 733190 733210 733230 733250
733130 733150 733170 733190 733210 733230 733250
34° 59' 14'' N
120° 26' 45'' W
34° 59' 14'' N
120° 26' 40'' W
34° 59' 8'' N
120° 26' 45'' W
34° 59' 8'' N
120° 26' 40'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 40 80 160 240
Feet
0 10 20 40 60
Meters
Map Scale: 1:870 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:20,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.
Soil Survey Area: Northern Santa Barbara Area, California Survey Area Data: Version 18, Sep 12, 2023
Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.
Date(s) aerial images were photographed: Mar 12, 2022—Apr 12, 2022
The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.
Soil Map—Northern Santa Barbara Area, California
(HIdden Pines)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/14/2024
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Sh Sandy alluvial land 3.2 100.0%
Totals for Area of Interest 3.2 100.0%
Soil Map—Northern Santa Barbara Area, California HIdden Pines Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
8/14/2024
2624 Airpark Drive, Santa Maria • California 93455 • Tel 805-934-5767 • Fax 805-934-3448 May 5, 2025
Frank Albro
City of Santa Maria
Community Development Department
110 S. Pine Street #101
Santa Maria, CA 93558
RE: Courtyard at Hidden Pines, TR2025-0001, PD2025-0001.
As a part of the Incomplete Letter for this project dated 4-11-2025, there is a request for a Hydrologic and Hydraulic Study. This letter is intended to address that request.
The Hidden Pines development project proposes to develop 2.9 AC. of vacant land on the northwest corner of Hidden Pines Way and Railroad Ave (APN 117-930-014), in Santa Maria, CA. This mixed-use development proposes to provide a mix of single family dwellings, and a neighborhood friendly commercial space.
We confirmed with the City Engineering Department (David Beas) that the City of Santa Maria retardation requirements for this property were included in the basin design for Tract 5764, and that the City standard retardation requirements have been met.
This does not relieve this project from the standard storm water Post Construction Requirements (PCR’s). A separate Storm Water Control Plan has been prepared for this project that addresses that mitigation.
Sincerely,
Russell J. Garrison P.E.
Appendix E
Traffic and Vehicle Miles Traveled (VMT) Study
ASSOCIATED TRANSPORTATION ENGINEERS
100 N. Hope Avenue, Suite 4, Santa Barbara, CA 93110 • (805)687-4418 • [email protected]
Since 1978
Richard L. Pool, P.E.
Scott A. Schell
June 25, 2025 25031L02
Dan Patin
Patin Media Ventures, LLC
26562 Shanne Drive
Lake Forest, CA 92630
TRAFFIC AND VMT STUDY FOR THE
COURTYARD AT HIDDEN PINES PROJECT - CITY OF SANTA MARIA Associated Transportation Engineers (ATE) has prepared the following traffic and Vehicle Miles Traveled (VMT) study for the Courtyard at Hidden Pines Project (the “Project”) proposed in the City of Santa Maria. The study reviews the Project’s trip generation and trip distribution parameters and determines the Project’s consistency with the City’s transportation policies. An analysis of site access, circulation and queuing is provided. The study also evaluates the Project’s potential CEQA transportation impacts based on the City’s adopted VMT impact criteria.
PROJECT DESCRIPTION
The Project site is located on the northwest corner of the Hidden Pines Way/Railroad Avenue intersection in the City of Santa Maria. Figure 1 (attached) shows the location of the Project site within the City. Figure 2 shows the Project site plan. The Project is proposing to construct 6 townhomes, 8 market-rate apartments, a 15,789 SF recreation center and 4,465 SF of neighborhood-scale commercial with outdoor gathering space and amenities. It is noted that building 6 of the commercial buildings could be separated to provide an urgent care, neighborhood café or market in future plans. Parking for the Project would be provided onsite with 72 parking spaces. Access to the site would be provided via one new driveway on Hidden Pines Way and one new driveway on Railroad Avenue.
Courtyard at Hidden Pines Page 2 June 25, 2025
PROJECT TRIP GENERATION
As noted in the Project Description, the Project is contemplating several different land use mixes in commercial building 6. Trip generation estimates were therefore calculated for multiple scenarios, as follows:
• Scenario 1 – All Retail
• Scenario 2 – Urgent Care and Retail
• Scenario 3 – Urgent Care and Cafe
• Scenario 4 – Urgent Care and Coffee Shop (no drive-thru) Trip generation estimates were calculated for the Project using rates presented in the Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition) 1. The rates for Multifamily Housing Low-Rise (Land Use Code #220), Health Fitness Club (Land Use Code #492), Strip Retail Plaza (Land Use Code #822), Clinic (Land Use Code #630), High Turnover Sit-Down Restaurant (Land Use Code #932) and Coffee/Donut Shop Without Drive-Through Window (Land Use Code #936) were used for the analysis. The traffic analysis will focus on day-to-day operations, with a separate discussion of weekend and evening events.
Internal Capture/Local Neighborhood Reductions
Given the mix of land uses, there will be some trips that travel between the various land uses that comprise the site and do not affect the off-site street network. “Internal Capture” trips include trip interactions between the individual commercial uses as well as between the commercial/recreational uses and residential uses. Additionally, the commercial/ recreational land uses are intended to serve the local neighborhood. The ITE mixed-use traffic model was used to estimate the number of trips that would be captured within the site (attached). The mixed-use model shows that 10–20% of the trips generated by the commercial land-uses of the Project would be internal to the site or from the local neighborhood via walking or biking. The analysis assumes a conservative 15% internal capture for the 4 scenarios. Tables 1-4 present the multiple scenarios of trip generation estimates with the internal factors for the Project (detailed worksheet attached) and Table 5 presents a comparison of the multiple scenarios.
1 Trip Generation, Institute of Transportation Engineers, 11th Edition, 2021.
Courtyard at Hidden Pines Page 3 June 25, 2025
Table 1
Project Trip Generation Scenario 1– All Retail
Land Use Size
Internal
Factor (d)
ADT AM Peak Hour PM Peak Hour
Rate Trips Rate Trips Rate Trips
Residential (a) 14 DU 1.00 6.74 94 0.40 6 (1/5) 0.51 7 (4/3) Commercial (b) 4,465 SF 0.85 54.45 207 2.36 9 (5/4) 6.59 25 (13/12) Recreation Center (c) 15,789 SF 0.85 34.50 463 1.31 18 (9/9) 3.45 46 (26/20) Totals 764 33 (15/18) 78 (43/35)
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Strip Retail Plaza <40k (ITE #822). (c) Trip generation based on ITE rates Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used.
(d) Assumes a 15% reduction for commercial trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
The data presented in Table 1 indicate that the Project with all retail for building 6 is forecast to generate 764 ADT, 33 AM peak hour trips and 78 PM peak hour trips.
Table 2
Project Trip Generation Scenario 2 - Urgent Care + Retail Land Use Size
Internal
Factor (e)
ADT AM Peak Hour PM Peak Hour
Rate Trips Rate Trips Rate Trips
Residential (a) 14 DU 1.00 6.74 94 0.40 6 (1/5) 0.51 7 (4/3) Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 (6/1) 3.69 10 (3/7) Retail (c) 1,842 SF 0.85 54.45 85 2.36 4 (2/2) 6.59 10 (5/5) Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 (9/9) 3.45 46 (26/20) Totals 741 35 (18/17) 73 (38/35)
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for Strip Retail Plaza <40k (ITE #822). (d) Trip generation based on ITE rates Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used.
(e) Assumes a 15% reduction for retail trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
The data presented in Table 2 indicate that the Project with an urgent care and retail in building 6 is forecast to generate 741 ADT, 35 AM peak hour trips and 73 PM peak hour trips.
Courtyard at Hidden Pines Page 4 June 25, 2025
Table 3
Project Trip Generation Scenario 3 – Urgent Care + Café (With High Turnover Sit-Down Restaurant Rates)
Land Use Size
Internal
Factor (e)
ADT AM Peak Hour PM Peak Hour
Rate Trips Rate Trips Rate Trips
Residential (a) 14 DU 1.00 6.74 94 0.40 6 (1/5) 0.51 7 (4/3) Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 (6/1) 3.69 10 (3/7) Café (c) 1,842 SF 0.85 107.20 168 9.57 15 (8/7) 9.05 14 (9/5) Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 (9/9) 3.45 46 (26/20) Totals 824 46 (24/22) 77 (42/35)
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for High Turnover Sit-Down Restaurant (ITE #932). (d) Trip generation based on ITE rates Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used.
(e) Assumes a 15% reduction for café trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
The data presented in Table 3 indicate that the Project with an urgent care and café (with high turnover sit-down restaurant rates) in building 6 is forecast to generate 824 ADT, 46 AM peak hour trips and 77 PM peak hour trips.
Table 4
Project Trip Generation Scenario 4 – Urgent Care + Coffee Shop (With Coffee/Donut Shop Rates)
Land Use Size
Internal
Factor (e)
ADT AM Peak Hour PM Peak Hour
Rate Trips Rate Trips Rate Trips
Residential (a) 14 DU 1.00 6.74 94 0.40 6 (1/5) 0.51 7 (4/3) Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 (6/1) 3.69 10 (3/7) Coffee Shop (c) 1,842 SF 0.85 461.29 722 93.08 146 (74/72) 32.29 51 (26/25) Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 (9/9) 3.45 46 (26/20) Totals 1,378 177 (90/87) 114 (59/55)
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for Coffee/Donut Shop Without Drive-Through Window (ITE #936). No ADT rates available, thus the PM peak hour ratio of the ADT rates for Coffee/Donut Shop with Drive-Through Window (ITE #934) were used (The PM Peak Hour rate was 7% of the ADT rate, thus 32.29 / 0.07 = 461.29). (d) Trip generation based on ITE rates Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used.
(e) Assumes a 15% reduction for coffee shop trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
The data presented in Table 4 indicate that the Project with an urgent care and coffee shop (with coffee/donut shop rates) in building 6 is forecast to generate 1,378 ADT, 177 AM peak hour trips and 114 PM peak hour trips.
Courtyard at Hidden Pines Page 5 June 25, 2025
Table 5 provides a comparison of the trip generation estimates for the four scenarios.
Table 5
Project Trip Generation – All Scenarios
Scenario ADT
AM Peak
Hour Trips
PM Peak
Hour Trips
1. All Retail 764 33 (15/18) 78 (43/35)
2. Urgent Care + Retail 741 35 (18/17) 73 (38/35)
3. Urgent Care + Café
(High Turnover Sit-Down Restaurant Rates)
824 46 (24/22) 77 (42/35)
4. Urgent Care + Coffee Shop
(With Coffee/Donut Shop Rates) 1,378 177 (90/87) 114 (59/55) The data presented in Table 5 indicate that scenario #4 with the urgent care and coffee shop (with coffee/donut shop rates) is forecast to generate higher trip estimates than the other scenarios. This scenario will therefore be used for the analysis to be conservative.
Commercial Pass-By/Primary Trip Estimates
Pursuant to ITE recommendations, the trip generation analysis also accounts for “Pass-By” trips and “Primary” trips that would be generated by the commercial uses. Pass-By trips are trips that would come from the existing traffic streams on Hidden Pines Way and Railroad Avenue; and would not affect the study-area street network beyond the Project site. Primary trips are trips with the sole purpose of patronizing the commercial center (i.e., from home to the store and then return home). Pass-By data for a coffee/donut shop without drive-through window is not available, therefore the pass-by data for fast-food restaurant with drive-through window was used. The data presented in the ITE Trip Generation manual show that the Pass-By Trip percentage is 50% during the AM peak hour and 55% during the PM peak hour. The average (53%) was used for the ADT. Table 6 presents the trip generation estimates with the internal factors and pass-by reductions for the Project.
Courtyard at Hidden Pines Page 6 June 25, 2025
Table 6
Project Trip Generation Scenario 4 – Urgent Care + Coffee Shop (With Coffee/Donut Shop Rates)
Land Use Size
Internal
Factor (e)
ADT AM Peak Hour PM Peak Hour
Rate Trips Rate Trips Rate Trips
Residential (a) 14 DU 1.00 6.74 94 0.40 6 (1/5) 0.51 7 (4/3) Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 (6/1) 3.69 10 (3/7) Coffee shop (c) 1,842 SF 0.85 461.29 722 93.08 146 (74/72) 32.29 51 (26/25) Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 (9/9) 3.45 46 (26/20) Subtotals 1,378 177 (90/87) 114 (59/55)
Pass-by Reduction (53% ADT, 50% AM, 55% PM for Café) 383 73 (37/36) 28 (14/14) Total with Pass-by Reduction 995 104 (53/51) 86 (45/41) (a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for Coffee/Donut Shop Without Drive-Through Window (ITE #936). No ADT rates available, thus the PM peak hour ratio of the ADT rates for Coffee/Donut Shop with Drive-Through Window (ITE #934) were used (The PM Peak Hour rate was 7% of the ADT rate, thus 32.29 / 0.07 = 461.29). (d) Trip generation based on ITE rates Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used.
(e) Assumes a 15% reduction for coffee shop trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
The data presented in Table 6 indicate that the Project with the internal factors and pass-by reductions is forecast to generate 995 ADT, 104 AM peak hour trips and 86 PM peak hour trips.
PROJECT TRIP DISTRIBUTION
The trip distribution pattern for the Project was developed based on existing traffic patterns observed in the study-area, consideration of the land uses in the surrounding area, and the proposed access and parking system. Given that the traffic generated by the commercial uses would have a different orientation than the traffic generated by the residential uses, two separate distribution patterns were developed for these Project components. The trip distribution includes pass-by trip distribution at the Project driveways based on the traffic flows of the adjacent streets. Table 7 and Figure 3 presents the trip distribution patterns developed for the Project.
Courtyard at Hidden Pines Page 7 June 25, 2025
Table 7
Project Trip Distribution
Origin/Destination Direction
Residential
Percentage
Commercial
Percentage
Hidden Pines Way West
East
15%
70%
30%
20%
Railroad Avenue North
South
0%
15%
5%
45%
Total: 100% 100%
TRAFFIC POLICY STANDARDS
The City of Santa Maria Circulation Element considers LOS D acceptable for roadway and intersection operations, with improvements required for LOS E and F.
Intersection Consistency Analysis
Existing intersection traffic volumes were obtained from traffic count data collected in April of 2025 when the local schools were in session (count data attached). Counts were conducted during the AM peak commuter period (7:00-9:00 AM) and the PM peak commuter period (4:00-6:00 PM). The peak 1-hour volumes were then identified for the analysis. Figure 4 shows the Existing intersection volumes and Figure 5 shows the Existing + Project volumes. Levels of service (LOS) were calculated for the intersection using the Highway Capacity Manual (HCM)2 methodology using the SIDRA Intersection Software3 (LOS calculations attached). Tables 8 and 9 summarize the Existing and Existing + Project levels of service and assess the consistency of the Project with the City’s intersection policies. 2 Highway Capacity Manual, Transportation Research Board, 7th Edition, 2022. 3 SIDRA Intersection 10 Software, SIDRA Solutions, 2025.
Courtyard at Hidden Pines Page 8 June 25, 2025
Table 8
Existing + Project Intersection Operations - AM Peak Hour Intersection
Existing Existing + Project
Delay LOS Delay LOS Consistent?
Hidden Pines Way/Railroad Avenue 7.7 sec LOS A 8.4 sec LOS A YES Table 9
Existing + Project Intersection Operations - PM Peak Hour Intersection
Existing Existing + Project
Delay LOS Delay LOS Consistent?
Hidden Pines Way/Railroad Avenue 5.2 sec LOS A 5.4 sec LOS A YES The data presented in Tables 8 and 9 show that the Hidden Pines Way/Railroad Avenue intersection would operate acceptably in the LOS A range with Existing and Existing + Project volumes. The Project would therefore be consistent with the City’s LOS D operating standard.
SITE ACCESS AND CIRCULATION
Access to the site would be provided via one new driveway on Hidden Pines Way and one new driveway on Railroad Avenue. Both driveways would provide full access with left- and right-turns in and out.
Driveway Operations
Levels of service were calculated for the Project driveways assuming Existing + Project traffic volumes shown on Figure 5. Table 10 presents the levels of service for the Project driveways (Detailed LOS worksheets attached).
Courtyard at Hidden Pines Page 9 June 25, 2025
Table 10
Existing + Project Driveway Levels of Service
Intersection
Delay / LOS
AM Peak Hour PM Peak Hour
Hidden Pines Way/Project Driveway
SB Driveway Left+Right
EB Left
Average Weighted Delay
20.4 Sec./LOS C
8.5 Sec./LOS A
16.6 Sec./LOS C
11.6 Sec./LOS B
7.9 Sec./LOS A
10.5 Sec./LOS B
Railroad Avenue/Project Driveway
EB Driveway Left+Right
NB Left
Average Weighted Delay
9.2 Sec./LOS A
7.5 Sec./LOS A
8.5 Sec./LOS A
8.8 Sec./LOS A
7.4 Sec./LOS A
8.2 Sec./LOS A
As shown in Table 10, delays for vehicles entering and exiting the site at both driveways are forecast to operate in the LOS A-C range during the AM and PM peak hours under Existing + Project conditions, which meet the City’s LOS D standard.
Queuing Analysis
As requested by City staff, a queueing analysis was conducted for the Project driveways and study-area intersection to determine the future vehicle queues. The queue lengths were based on queues determined within the Highway Capacity Software (HCS)4and the SIDRA Intersection Software. Table 11 summarizes the peak (95th) queue forecasts for the Project driveways and study-area intersection.
4 Highway Capacity Software, McTrans Center at the University of Florida Transportation Institute, 2024.
Courtyard at Hidden Pines Page 10 June 25, 2025
Table 11
Queuing Analysis – Existing + Project Conditions
Intersection
95th Queue Length
AM Peak Hour PM Peak Hour
Hidden Pines Way/Project Driveway
Southbound Left + Right
Eastbound Left
2 Vehicles
<1 Vehicle
<1 Vehicle
<1 Vehicle
Railroad Avenue/Project Driveway
Eastbound Left + Right
Northbound Left
<1 Vehicle
<1 Vehicle
<1 Vehicle
<1 Vehicle
Hidden Pines Way/Railroad Avenue
Eastbound Left+Thru+Right
Westbound Left+Thru+Right
Northbound Left+Thru+Right
Southbound Left+Thru+Right
4 Vehicles
3 Vehicles
2 Vehicles
1 Vehicle
1 Vehicle
2 Vehicles
1 Vehicle
< 1 Vehicle
The data presented in Table 11 show that all the approaching movements at the Project driveways are forecast to have 2 vehicles or less in queue during the AM and PM peak hours under Existing + Project conditions. The data also show that the approaching movements at the Hidden Pines Way/Railroad Avenue intersection are forecast to have a range of 1 to 4 vehicles in queue.
School Queuing Analysis
Field observations showed that the drop-off and pick-up periods for the Tommie Kunst Junior High School located just west of the Project on Hidden Pines Way site found that the queues extending from the school currently extend past to the location of the Project’s proposed driveways. Traffic generated from the school occurs for approximately 15 minutes just before classes begin (8:42 AM) and just after classes end (3:45 PM), as discussed below.
Morning Drop-Off
During the morning drop-off peak period, it was observed that the westbound queues from the school on Hidden Pines Way blocked the Project driveway on Hidden Pines Way for approximately 10 minutes (8:33–8:43 AM). There were no queues on Railroad Avenue extending to the Project driveway, therefore vehicles would have access to the driveway on Railroad Avenue during the school’s morning drop-off period.
Afternoon Pick-Up
During the afternoon drop-off peak period, it was observed that the eastbound queues on Hidden Pines Way extended past the Project driveway and southbound queues on Railroad Avenue extended past the Project driveway for approximately 10 minutes (3:49-3:59 PM).
Outbound vehicles from the Project site travelling towards the Hidden Pines Way/Railroad Avenue intersection would experience delays during these 10-minute periods unless the vehicles utilized the Project driveway on Hidden Pines Way for right-turns out. It is noted that “Keep Clear” pavement markings could be implemented at the Project driveways to ensure that the queues from the school do not block the Project driveways.
Courtyard at Hidden Pines Page 11 June 25, 2025
Frontage Improvements
Hidden Pines Way is currently improved with 44 feet of traveled way (with on-street parking on the north side adjacent to the Project), curb, gutter and sidewalk. Railroad Avenue is currently improved with 34 feet of traveled way (with on-street parking), curb, gutter and sidewalk. It is recommended that a red curb “No Parking” zone be installed on Hidden Pines Way east of the Project driveway and on Railroad Avenue south of the Project driveway to maintain sight distances for vehicles approaching from the Hidden Pines Way/Railroad Avenue intersection, as shown on Figure 6. The red curb would also restrict on-street parking on Hidden Pines Way and Railroad Avenue due to the proximity to the Hidden Pines Way/Railroad Avenue intersection. Due to the relatively low traffic volumes and low queue forecasts for the Project driveways shown previously, no turn-lanes would be required for the Project driveways.
SPECIAL EVENTS
The Project also proposes to host neighborhood events on-site in the outdoor gathering space. These events would include farmer’s market, food trucks, and holiday gatherings, which would occur outside of school hours. The 72 parking spaces on-site would accommodate the parking demands generated by events. The Project would coordinate with City staff on a traffic management plan for events.
VEHICLE MILES TRAVELED ANALYSIS
Per the State’s Natural Resource Agency Updated Guidelines for the Implementation of the CEQA adopted in 2018, Vehicle Miles Traveled (VMT) has been designated as the most appropriate measure of transportation impacts. “Vehicle Miles Traveled” refers to the amount and distance of automobile travel attributable to a project. Other relevant considerations may include the effects of the project on transit and non-motorized travel.
For land use projects, vehicle miles traveled exceeding an applicable threshold of significance may indicate a significant impact. The Governor’s Office of Planning and Research (OPR) published a Technical Advisory on Transportation that includes recommendations regarding assessment of VMT, thresholds of significance, and mitigation measures.5 The Technical Advisory provides screening tools to determine when a project may have a significant VMT impacts.
The City of Santa Maria’s adopted Environmental Procedures and Guidelines (“CEQA Guidelines”) manual contain thresholds and methodologies for assessing potential VMT impacts for Projects located in the City, which are reviewed below. 5 Technical Advisory on Evaluating Transportation Impacts in CEQA, Governor’s Office of Planning and Research, December 2018.
Courtyard at Hidden Pines Page 12 June 25, 2025
Criteria For Mixed-Use Developments
The City’s CEQA Guidelines manual provides the following guidance for mixed-use projects:
“For mixed use projects, the CEQA Guidelines recommend either analyzing each component of the proposed project separately or focusing on the predominant land use.”
Based on this guidance, separate VMT analyses were completed for the residential, urgent care and commercial portions of the Project.
VMT Analysis – Residential
The potential VMT impacts associated with the residential portion of the Project are reviewed below.
Screening Criteria – Small Projects
Consistent with the recommendations in the OPR Technical Advisory, Section 4.3.1 of the City of Santa Maria’s CEQA Guidelines establishes screening criteria for certain projects that are exempt from performing a detailed VMT analysis and may be presumed to have a less than significant VMT impact. Section 4.3.1-A states that:
3. Small discretionary projects that would generate or attract fewer than 110 daily trips (per CEQA).”
The residential portion of the Project would generate 94 ADT. The residential portion of the Project therefore satisfies the screening criteria for small discretionary projects and may be presumed to result in less than significant VMT impacts in accordance with the City of Santa Maria thresholds.
VMT Analysis – Clinic
The potential VMT impacts associated with a medical clinic are reviewed below.
Screening Criteria - Clinics
Section 4.3.1-A states that:
“Most freestanding clinics, medical practices, and nursing homes could be assumed less than significant with respect to VMT impacts."
Courtyard at Hidden Pines Page 13 June 25, 2025
Screening Criteria – Small Projects
Consistent with the recommendations in the OPR Technical Advisory, Section 4.3.1 of the City of Santa Maria’s CEQA Guidelines establishes screening criteria for certain projects that are exempt from performing a detailed VMT analysis and may be presumed to have a less than significant VMT impact. Section 4.3.1-A states that:
3. Small discretionary projects that would generate or attract fewer than 110 daily trips (per CEQA).”
The Project consists of an urgent care clinic which therefore satisfies the screening criteria for freestanding clinics. Additionally, the urgent care clinic portion of the Project would generate 99 ADT. The Project would therefore be presumed to result in less than significant VMT impacts in accordance with the City of Santa Maria thresholds.
VMT Analysis – Commercial
The potential VMT impacts associated with the retail portion of the Project are reviewed below.
Screening Criteria
Consistent with the recommendations in the OPR Technical Advisory, Section 4.3.1 of the City of Santa Maria’s CEQA Guidelines establishes screening criteria for certain projects that are exempt from performing a detailed VMT analysis and may be presumed to have a less than significant VMT impact. Section 4.3.1-A states that:
“The following discretionary development projects are not subject to VMT analysis:
1. A discretionary retail development project that is 50,000 square feet or less. Does not apply to regional shopping centers that predominately serve customers that live outside of the City limits.”
The coffee shop and recreation center portions of the Project contain 17,631 SF of uses that would be local serving; and the commercial component is less than 50,000 SF. The commercial portion of the Project therefore satisfies the screening criteria for local serving retail uses and may be presumed to result in less than significant VMT impacts in accordance with the City of Santa Maria thresholds.
Courtyard at Hidden Pines Page 14 June 25, 2025
This concludes our traffic and VMT study for the Courtyard at Hidden Pines Project.
Associated Transportation Engineers
Scott A. Schell
Principal Transportation Planner
SAS/GOM
Attachments
PROJECT SITE LOCATION AT SSOCIATED RANSPORTATION E NGINEERS FIGURE N NOT TO SCALE GM- ATE#25031 1 PROJECT SITE PROJECT SITE PLAN AT SSOCIATED RANSPORTATION E NGINEERS FIGURE N NOT TO SCALE GM- ATE#25031 2 Railroad Avenue
Hidden Pines Way
PROJECT SITE 1 PROJECT TRIP DISTRIBUTION AND ASSIGNMENT - WITH PASS-BY TRIPS AT SSOCIATED RANSPORTATION E NGINEERS FIGURE N NOT TO SCALE GM- ATE#25031 3 A B 1AB LEGEND (XX)XX - (AM)PM Peak Hour Volume - Roundabout (4)4 (7)7 5(6)
4(5) 6(7) 13(16)
(17)14
(7)6 (38)27 (-15)-6
17(29)
25(39) -6(-16) 18(32)
-1(-4)
3(7) 3(4) 10(15)
(13)11
(-2)-1- Distribution Percentage Residentail Commercial 70% 20% 15% 30% 15% 45% 0%5% PROJECT TRIP GENERATION ADT AM PEAK HOUR PM PEAK HOUR IN OUT TOTAL 90 87 177 59 55 114 1,378 Railroad Avenue
Hidden Pines Way
PROJECT SITE 1 EXISTING TRAFFIC VOLUMES AT SSOCIATED RANSPORTATION E NGINEERS FIGURE N NOT TO SCALE GM- ATE#25031 4 LEGEND (XX)XX - (AM)PM Peak Hour Volume - Roundabout 1 (31)39 (62)116 (232)215 16(18)
2(1)
47(67) 140(232) 4(1) 32(114)
(80)60
(14)22
(103)95 AB (313)279 176(347)
65(86)
(46)64 A B
Railroad Avenue
Hidden Pines Way
PROJECT SITE 1 EXISTING + PROJECT TRAFFIC VOLUMES AT SSOCIATED RANSPORTATION E NGINEERS FIGURE N NOT TO SCALE GM- ATE#25031 5 A B LEGEND (XX)XX - (AM)PM Peak Hour Volume - Roundabout 1AB (35)43 (62)116 (239)222 21(24)
2(1)
51(72) 146(239) 4(1) 45(130)
(97)74
(21)28
(103)95 (38)27 (298)273
17(29)
25(39) 170(331) 18(32)
64(82)
3(7) 3(4) 10(15)
(13)11
(44)63
RECOMMENDED RED CURB ON HIDDEN PINES WAY AND RAILROAD AVENUE A
T SSOCIATED RANSPORTATION E NGINEERS FIGURE
N NOT TO SCALE GM- ATE#25031
6 Implement Red Curb East of the Hidden Pines Way Driveway Implement Red Curb South of the Railroad Avenue Driveway Associated Transportation Engineers #25031
Trip Generation Worksheet
COURTYARD AT HIDDEN PINES PROJECT SCENARIO 1 - ALL RETAIL Internal-Trip
Use Factor (d) Rate Trips Rate Trips In % Trips Out % Trips Rate Trips In % Trips Out % Trips
PROPOSED
Residential (a) 14 DU 1.00 6.74 94 0.40 6 24% 1 76% 5 0.51 7 63% 4 37% 3 Commercial (b) 4,465 SF 0.85 54.45 207 2.36 9 60% 5 40% 4 6.59 25 50% 13 50% 12 Recreation Center (c) 15,789 SF 0.85 34.50 463 1.31 18 51% 9 49% 9 3.45 46 57% 26 43% 20 Totals 764 33 15 18 78 43 35
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Strip Retail Plaza <40k (ITE #822). (c) Trip generation based on ITE rates for Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used. (d) Assumes a 15% reduction for commercial trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
ADT AM PEAK HOUR PM PEAK HOUR
Size
Associated Transportation Engineers #25031
Trip Generation Worksheet
COURTYARD AT HIDDEN PINES PROJECT SCENARIO 2 - URGENT CARE + RETAIL Internal-Trip
Use Factor (e) Rate Trips Rate Trips In % Trips Out % Trips Rate Trips In % Trips Out % Trips
PROPOSED
Residential (a) 14 DU 1.00 6.74 94 0.40 6 24% 1 76% 5 0.51 7 63% 4 37% 3 Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 81% 6 19% 1 3.69 10 30% 3 70% 7 Retail (c) 1,842 SF 0.85 54.45 85 2.36 4 60% 2 40% 2 6.59 10 50% 5 50% 5 Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 51% 9 49% 9 3.45 46 57% 26 43% 20 Totals 741 35 18 17 73 38 35
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for Strip Retail Plaza <40k (ITE #822). (d) Trip generation based on ITE rates for Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used. (e) Assumes a 15% reduction for retail trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
ADT AM PEAK HOUR PM PEAK HOUR
Size
Associated Transportation Engineers #25031
Trip Generation Worksheet
COURTYARD AT HIDDEN PINES PROJECT SCENARIO 3 - URGENT CARE + CAFÉ (WITH HIGH TURNOVER SIT-DOWN RESTAURANT RATES) Internal-Trip
Use Factor (e) Rate Trips Rate Trips In % Trips Out % Trips Rate Trips In % Trips Out % Trips
PROPOSED
Residential (a) 14 DU 1.00 6.74 94 0.40 6 24% 1 76% 5 0.51 7 63% 4 37% 3 Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 81% 6 19% 1 3.69 10 30% 3 70% 7 Cafe (c) 1,842 SF 0.85 107.20 168 9.57 15 55% 8 45% 7 9.05 14 61% 9 39% 5 Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 51% 9 49% 9 3.45 46 57% 26 43% 20 Totals 824 46 24 22 77 42 35
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (c) Trip generation based on ITE rates for High Turnover (Sit-Down) Restaurant (ITE #932). (d) Trip generation based on ITE rates for Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used. (e) Assumes a 15% reduction for café trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
ADT AM PEAK HOUR PM PEAK HOUR
Size
Associated Transportation Engineers #25031
Trip Generation Worksheet
COURTYARD AT HIDDEN PINES PROJECT SCENARIO 4 - URGENT CARE + COFFEE SHOP (WITH COFFEE/DONUT SHOP RATES) Internal-Trip
Use Factor (e) Rate Trips Rate Trips In % Trips Out % Trips Rate Trips In % Trips Out % Trips
PROPOSED
Residential (a) 14 DU 1.00 6.74 94 0.40 6 24% 1 76% 5 0.51 7 63% 4 37% 3 Urgent Care (b) 2,623 SF 1.00 37.60 99 2.75 7 81% 6 19% 1 3.69 10 30% 3 70% 7 Cafe (c) 1,842 SF 0.85 461.29 722 93.08 146 51% 74 49% 72 32.29 51 50% 26 50% 25 Recreation Center (d) 15,789 SF 0.85 34.50 463 1.31 18 51% 9 49% 9 3.45 46 57% 26 43% 20 Totals 1,378 177 90 87 114 59 55
(a) Trip generation based on ITE rates for Multifamily Housing (Low-Rise) (ITE #220). (b) Trip generation based on ITE rates for Clinic (ITE #630). (d) Trip generation based on ITE rates for Health/Fitness Club (ITE #492). No ADT rates available, thus ADT rates for Recreational Community Center (ITE #495) were used. (e) Assumes a 15% reduction for café trips and recreation center trips for residents walking/biking from the Project site or the local neighborhood.
CAFE PASS-BY & PRIMARY TRIPS ADT AM Total AM In AM Out PM Total PM In PM Out Commercial External Trips - Café 722 146 74 72 51 26 25 53% ADT, 50% AM, 55% PM Pass-By Trips - Applied to Café 383 73 37 36 28 14 14 47% ADT, 50% AM, 45% PM Primary Trips - Remainder Café 339 73 37 36 23 12 11 TOTAL PASS-BY TRIPS ADT AM Total AM In AM Out PM Total PM In PM Out Café 383 73 37 36 28 14 14
Total Pass-By Trips 383 73 37 36 28 14 14
TOTAL EXTERNAL PRIMARY TRIPS ADT AM Total AM In AM Out PM Total PM In PM Out Commercial External 339 73 37 36 23 12 11
Residential External 94 6 1 5 7 4 3
Urgent Care External 99 7 6 1 10 3 7
Recreation Center External 463 18 9 9 46 26 20
Total External Trips 995 104 53 51 86 45 41
(c) Trip generation based on ITE rates for Coffee/Donut Shop Without Drive-Through Window (ITE #936). No ADT rates available, thus the PM peak hour ratio of the ADT rates for Coffee/Donut Shop with Drive-Through Window (ITE #934) were used (The PM Peak Hour rate was 7% of the ADT rate, thus 32.29 / 0.07 = 461.29).
ADT AM PEAK HOUR PM PEAK HOUR
Size
Project Name: Organization:
Project Location: Performed By:
Scenario Description: Date:
Analysis Year: Checked By:
Analysis Period: Date:
ITE LUCs1 Quantity Units Total Entering Exiting
Office 630 2,623 SF 7 6 1
Retail 0
Restaurant 936 1,842 SF 171 87 84
Cinema/Entertainment 492 15,789 SF 21 11 10
Residential 210,220 414 DU 286 71 215
Hotel 0
All Other Land Uses2 0
485 175 310
Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office 2% 4%
Retail
Restaurant 2% 4%
Cinema/Entertainment 2% 4%
Residential 2% 4%
Hotel
All Other Land Uses2
Office Retail Restaurant Residential Hotel
Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
Office Retail Restaurant Residential Hotel
Office 0 0 0 0
Retail 0 0 0 0
Restaurant 1 0 3 0
Cinema/Entertainment 0 0 0 0 0
Residential 0 0 17 0
Hotel 0 0 0 0
Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 485 175 310 Office 17% 0%
Internal Capture Percentage 9% 12% 7% Retail N/A N/A
Restaurant 20% 5%
External Vehicle-Trips5 435 146 289 Cinema/Entertainment 0% 0% External Transit-Trips6 2 2 0 Residential 4% 8%
External Non-Motorized Trips6 6 6 0 Hotel N/A N/A
NCHRP 684 Internal Trip Capture Estimation Tool
Table 1-A: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) 0 0
Cinema/Entertainment
Development Data (For Information Only )
0 0
0 Estimated Vehicle-Trips3
Land Use
Courtyard at Hidden Pines
Table 2-A: Mode Split and Vehicle Occupancy Estimates
Table 4-A: Internal Person-Trip Origin-Destination Matrix* Destination (To) Origin (From)
Origin (From) Destination (To)
Cinema/Entertainment
Land Use Entering Trips Exiting Trips
Table 3-A: Average Land Use Interchange Distances (Feet Walking Distance) Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 Table 5-A: Computations Summary Table 6-A: Internal Trip Capture Percentages by Land Use 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A. 1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 6Person-Trips
*Indicates computation that has been rounded to the nearest whole number. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual ). 4Enter vehicle occupancy assumed in Table 1-A vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made to Tables 5-A, 9-A (O and D). Enter transit, non-motorized percentages that will result with proposed mixed-use project complete.
Santa Maria
AM Street Peak Hour
ATE
GOM
4/21/2025
2025
4/21/2025
SAS
4 -UC+coffee shop With Neighborhood
Project Name: Organization:
Project Location: Performed By:
Scenario Description: Date:
Analysis Year: Checked By:
Analysis Period: Date:
ITE LUCs1 Quantity Units Total Entering Exiting
Office 630 2,623 SF 10 3 7
Retail 0
Restaurant 936 1,842 SF 59 30 29
Cinema/Entertainment 492 15,789 SF 54 31 23
Residential 210,220 414 DU 383 241 142
Hotel 0
All Other Land Uses2 0
506 305 201
Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office 2% 4%
Retail
Restaurant 2% 4%
Cinema/Entertainment 2% 4%
Residential 2% 4%
Hotel
All Other Land Uses2
Office Retail Restaurant Residential Hotel
Office
Retail
Restaurant
Cinema/Entertainment
Residential
Hotel
Office Retail Restaurant Residential Hotel
Office 0 0 0 0
Retail 0 0 0 0
Restaurant 1 0 5 0
Cinema/Entertainment 0 0 1 2 0
Residential 1 0 4 0
Hotel 0 0 0 0
Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 506 305 201 Office 67% 0%
Internal Capture Percentage 6% 5% 8% Retail N/A N/A
Restaurant 17% 28%
External Vehicle-Trips5 456 271 185 Cinema/Entertainment 6% 13% External Transit-Trips6 7 7 0 Residential 3% 4%
External Non-Motorized Trips6 11 11 0 Hotel N/A N/A
*Indicates computation that has been rounded to the nearest whole number.
Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 4 -UC+coffee shop With Neighborhood
SAS
4/21/2025
2025
PM Street Peak Hour 4/21/2025
Table 1-P: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) Land Use Development Data (For Information Only ) Estimated Vehicle-Trips3 Table 2-P: Mode Split and Vehicle Occupancy Estimates
Land Use Entering Trips Exiting Trips
NCHRP 684 Internal Trip Capture Estimation Tool
Courtyard at Hidden Pines ATE
Santa Maria GOM
Table 3-P: Average Land Use Interchange Distances (Feet Walking Distance) Origin (From) Destination (To)
Cinema/Entertainment
Table 4-P: Internal Person-Trip Origin-Destination Matrix* Origin (From) Destination (To)
Cinema/Entertainment
0 0
2 0
0 Table 5-P: Computations Summary Table 6-P: Internal Trip Capture Percentages by Land Use 4Enter vehicle occupancy assumed in Table 1-P vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made 6Person-Trips
1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual ). 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P.
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: N Railroad Ave -- Hidden Pines Way QC JOB #: 17021301 CITY/STATE: Santa Maria, CA DATE: Tue, Apr 29 2025
86 46
1 18 67
313 1 31 325
232 0.70 232
347 114 62 402
80 14 103
194 197
Peak-Hour: 7:45 AM -- 8:45 AM
Peak 15-Min: 8:30 AM -- 8:45 AM
2.3 2.2
100 5.6 0
2.6 0 3.2 2.8
1.7 1.7
1.7 1.8 6.5 1.5
3.8 0 1.9
3.6 2.5
3 0 6
0 0 1 0
0 1
0 1
0 0
0 0 0
N/A
N/A N/A
N/A
N/A
N/A N/A
N/A
15-Min Count
Period
Beginning At
N Railroad Ave
(Northbound)
N Railroad Ave
(Southbound)
Hidden Pines Way
(Eastbound)
Hidden Pines Way
(Westbound) Total Hourly
Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 7:00 AM 4 2 17 0 14 2 0 0 0 50 4 0 2 19 1 0 115
7:15 AM 3 2 23 0 14 2 2 0 1 55 7 0 12 37 6 0 164
7:30 AM 5 4 24 0 17 3 0 0 0 49 7 0 28 39 4 0 180
7:45 AM 3 2 34 0 15 1 0 0 0 45 7 0 31 47 3 0 188 647
8:00 AM 18 1 33 0 20 4 1 0 0 63 13 0 7 45 2 0 207 739
8:15 AM 26 2 21 0 11 6 0 0 1 44 28 0 10 65 3 0 217 792
8:30 AM 33 9 15 0 21 7 0 0 0 80 66 0 14 75 23 0 343 955 8:45 AM 12 1 14 0 6 1 0 0 1 35 28 0 4 25 1 0 128 895
Peak 15-Min
Flowrates
Northbound Southbound Eastbound Westbound Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 132 36 60 0 84 28 0 0 0 320 264 0 56 300 92 0 1372 Heavy Trucks 0 0 0 0 4 0 0 8 4 4 4 0 24
Buses
Pedestrians 0 4 0 16 20
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 5/7/2025 3:59 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: N Railroad Ave -- Hidden Pines Way QC JOB #: 17021303 CITY/STATE: Santa Maria, CA DATE: Tue, Apr 29 2025
65 64
2 16 47
279 4 39 370
140 0.98 215
176 32 116 281
60 22 95
164 177
Peak-Hour: 4:15 PM -- 5:15 PM
Peak 15-Min: 4:15 PM -- 4:30 PM
0 6.3
0 0 0
1.4 0 7.7 1.9
0.7 1.4
0.6 0 0.9 1.1
1.7 4.5 2.1
0.6 2.3
1 0 6
0 0 0 0
0 0
0 0
0 0
0 0 0
N/A
N/A N/A
N/A
N/A
N/A N/A
N/A
15-Min Count
Period
Beginning At
N Railroad Ave
(Northbound)
N Railroad Ave
(Southbound)
Hidden Pines Way
(Eastbound)
Hidden Pines Way
(Westbound) Total Hourly
Totals Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U 4:00 PM 10 5 13 0 13 5 0 0 1 49 7 0 34 44 12 0 193
4:15 PM 21 2 20 0 10 5 0 0 0 32 5 1 37 57 11 0 201
4:30 PM 11 8 28 0 12 5 1 0 0 33 11 0 27 54 4 0 194
4:45 PM 18 3 26 0 7 1 1 0 0 40 10 1 24 51 12 0 194 782
5:00 PM 10 9 21 0 17 5 0 1 2 35 6 0 28 53 12 0 199 788
5:15 PM 11 3 23 0 8 6 1 0 0 42 9 0 17 49 12 0 181 768
5:30 PM 15 10 27 0 12 9 1 0 0 37 7 0 31 41 10 0 200 774 5:45 PM 9 7 30 0 11 2 5 0 0 32 6 1 23 50 6 1 183 763
Peak 15-Min
Flowrates
Northbound Southbound Eastbound Westbound Total Left Thru Right U Left Thru Right U Left Thru Right U Left Thru Right U All Vehicles 84 8 80 0 40 20 0 0 0 128 20 4 148 228 44 0 804 Heavy Trucks 0 0 0 0 0 0 0 4 0 4 0 0 8
Buses
Pedestrians 0 0 0 12 12
Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0
Scooters
Comments:
Report generated on 5/7/2025 3:59 PM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
LANE LEVEL OF SERVICE
Lane Level of Service
Site: [2] HIDDEN PINES WAY/RAILROAD AVENUE AM EXISTING (General) Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Approaches Intersection
South East North West
LOS A A A A A
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane.
LOS F will result if v/c >1 irrespective of lane delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6).
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, May 27, 2025 11:19:40 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
MOVEMENT SUMMARY
Site: [2] HIDDEN PINES WAY/RAILROAD AVENUE AM EXISTING (General) Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Vehicle Movement Performance
Demand
Flows
Mov Arrival Flows 95% Back Of Queue
ID
Turn Mov
Class
Deg.
Satn
Aver.
Delay
Level of
Service
Prop.
Qued
Eff.
Stop
Rate
Number
of Cycles
to Depart
Aver.
Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ]
veh/h % veh/h % v/c sec veh ft mph
South: RAILROAD AVENUE
3 L2 All MCs 114 3.0 114 3.0 0.333 8.0 LOS A 1.6 40.8 0.60 0.46 0.60 30.6 8 T1 All MCs 20 3.0 20 3.0 0.333 8.0 LOS A 1.6 40.8 0.60 0.46 0.60 31.2 18 R2 All MCs 147 3.0 147 3.0 0.333 8.0 LOS A 1.6 40.8 0.60 0.46 0.60 31.0 Approach 281 3.0 281 3.0 0.333 8.0 LOS A 1.6 40.8 0.60 0.46 0.60 30.9 East: HIDDEN PINES WAY
1 L2 All MCs 89 3.0 89 3.0 0.401 7.0 LOS A 2.4 62.6 0.40 0.20 0.40 31.5 6 T1 All MCs 331 3.0 331 3.0 0.401 7.0 LOS A 2.4 62.6 0.40 0.20 0.40 32.1 16 R2 All MCs 44 3.0 44 3.0 0.401 7.0 LOS A 2.4 62.6 0.40 0.20 0.40 31.8 Approach 464 3.0 464 3.0 0.401 7.0 LOS A 2.4 62.6 0.40 0.20 0.40 32.0 North: RAILROAD AVENUE
7 L2 All MCs 96 3.0 96 3.0 0.163 6.5 LOS A 0.7 17.0 0.57 0.47 0.57 30.6 4 T1 All MCs 26 3.0 26 3.0 0.163 6.5 LOS A 0.7 17.0 0.57 0.47 0.57 31.1 14 R2 All MCs 1 3.0 1 3.0 0.163 6.5 LOS A 0.7 17.0 0.57 0.47 0.57 30.9 Approach 123 3.0 123 3.0 0.163 6.5 LOS A 0.7 17.0 0.57 0.47 0.57 30.7 West: HIDDEN PINES WAY
5 L2 All MCs 1 3.0 1 3.0 0.463 8.4 LOS A 2.9 74.1 0.53 0.32 0.53 31.3 2 T1 All MCs 331 3.0 331 3.0 0.463 8.4 LOS A 2.9 74.1 0.53 0.32 0.53 31.9 12 R2 All MCs 163 3.0 163 3.0 0.463 8.4 LOS A 2.9 74.1 0.53 0.32 0.53 31.6 Approach 496 3.0 496 3.0 0.463 8.4 LOS A 2.9 74.1 0.53 0.32 0.53 31.8 All Vehicles 1364 3.0 1364 3.0 0.463 7.7 LOS A 2.9 74.1 0.51 0.32 0.51 31.5 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement.
LOS F will result if v/c >1 irrespective of movement delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6).
Roundabout Capacity Model: US HCM 6.
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: Siegloch M1 implied by US HCM 6 Roundabout Capacity Model.
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, May 27, 2025 11:19:40 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
LANE LEVEL OF SERVICE
Lane Level of Service
Site: [2 (2)] HIDDEN PINES WAY/RAILROAD AVENUE AM EXISTING + PROJECT (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Approaches Intersection
South East North West
LOS A A A A A
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane.
LOS F will result if v/c >1 irrespective of lane delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6).
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, June 24, 2025 10:12:03 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
MOVEMENT SUMMARY
Site: [2 (2)] HIDDEN PINES WAY/RAILROAD AVENUE AM EXISTING + PROJECT (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Vehicle Movement Performance
Demand
Flows
Mov Arrival Flows 95% Back Of Queue
ID
Turn Mov
Class
Deg.
Satn
Aver.
Delay
Level of
Service
Prop.
Qued
Eff.
Stop
Rate
Number
of Cycles
to Depart
Aver.
Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ]
veh/h % veh/h % v/c sec veh ft mph
South: RAILROAD AVENUE
3 L2 All MCs 139 3.0 139 3.0 0.381 8.8 LOS A 1.9 49.0 0.63 0.50 0.65 30.2 8 T1 All MCs 30 3.0 30 3.0 0.381 8.8 LOS A 1.9 49.0 0.63 0.50 0.65 30.8 18 R2 All MCs 147 3.0 147 3.0 0.381 8.8 LOS A 1.9 49.0 0.63 0.50 0.65 30.6 Approach 316 3.0 316 3.0 0.381 8.8 LOS A 1.9 49.0 0.63 0.50 0.65 30.4 East: HIDDEN PINES WAY
1 L2 All MCs 89 3.0 89 3.0 0.430 7.7 LOS A 2.7 68.0 0.47 0.26 0.47 31.2 6 T1 All MCs 341 3.0 341 3.0 0.430 7.7 LOS A 2.7 68.0 0.47 0.26 0.47 31.8 16 R2 All MCs 50 3.0 50 3.0 0.430 7.7 LOS A 2.7 68.0 0.47 0.26 0.47 31.6 Approach 480 3.0 480 3.0 0.430 7.7 LOS A 2.7 68.0 0.47 0.26 0.47 31.7 North: RAILROAD AVENUE
7 L2 All MCs 103 3.0 103 3.0 0.191 7.1 LOS A 0.8 20.0 0.60 0.50 0.60 30.4 4 T1 All MCs 34 3.0 34 3.0 0.191 7.1 LOS A 0.8 20.0 0.60 0.50 0.60 31.0 14 R2 All MCs 1 3.0 1 3.0 0.191 7.1 LOS A 0.8 20.0 0.60 0.50 0.60 30.7 Approach 139 3.0 139 3.0 0.191 7.1 LOS A 0.8 20.0 0.60 0.50 0.60 30.6 West: HIDDEN PINES WAY
5 L2 All MCs 1 3.0 1 3.0 0.502 9.2 LOS A 3.3 83.4 0.57 0.35 0.57 30.9 2 T1 All MCs 341 3.0 341 3.0 0.502 9.2 LOS A 3.3 83.4 0.57 0.35 0.57 31.5 12 R2 All MCs 186 3.0 186 3.0 0.502 9.2 LOS A 3.3 83.4 0.57 0.35 0.57 31.3 Approach 529 3.0 529 3.0 0.502 9.2 LOS A 3.3 83.4 0.57 0.35 0.57 31.4 All Vehicles 1463 3.0 1463 3.0 0.502 8.4 LOS A 3.3 83.4 0.55 0.37 0.56 31.2 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement.
LOS F will result if v/c >1 irrespective of movement delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6).
Roundabout Capacity Model: US HCM 6.
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: Siegloch M1 implied by US HCM 6 Roundabout Capacity Model.
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, June 24, 2025 10:12:03 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
LANE LEVEL OF SERVICE
Lane Level of Service
Site: [2 (3)] HIDDEN PINES WAY/RAILROAD AVENUE PM EXISTING (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Approaches Intersection
South East North West
LOS A A A A A
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane.
LOS F will result if v/c >1 irrespective of lane delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6).
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, May 27, 2025 11:19:42 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
MOVEMENT SUMMARY
Site: [2 (3)] HIDDEN PINES WAY/RAILROAD AVENUE PM EXISTING (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Vehicle Movement Performance
Demand
Flows
Mov Arrival Flows 95% Back Of Queue
ID
Turn Mov
Class
Deg.
Satn
Aver.
Delay
Level of
Service
Prop.
Qued
Eff.
Stop
Rate
Number
of Cycles
to Depart
Aver.
Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ]
veh/h % veh/h % v/c sec veh ft mph
South: RAILROAD AVENUE
3 L2 All MCs 61 3.0 61 3.0 0.166 4.8 LOS A 0.8 19.4 0.37 0.21 0.37 32.2 8 T1 All MCs 22 3.0 22 3.0 0.166 4.8 LOS A 0.8 19.4 0.37 0.21 0.37 32.8 18 R2 All MCs 97 3.0 97 3.0 0.166 4.8 LOS A 0.8 19.4 0.37 0.21 0.37 32.6 Approach 181 3.0 181 3.0 0.166 4.8 LOS A 0.8 19.4 0.37 0.21 0.37 32.5 East: HIDDEN PINES WAY
1 L2 All MCs 118 3.0 118 3.0 0.309 5.7 LOS A 1.7 44.3 0.29 0.12 0.29 31.8 6 T1 All MCs 219 3.0 219 3.0 0.309 5.7 LOS A 1.7 44.3 0.29 0.12 0.29 32.5 16 R2 All MCs 40 3.0 40 3.0 0.309 5.7 LOS A 1.7 44.3 0.29 0.12 0.29 32.2 Approach 378 3.0 378 3.0 0.309 5.7 LOS A 1.7 44.3 0.29 0.12 0.29 32.2 North: RAILROAD AVENUE
7 L2 All MCs 48 3.0 48 3.0 0.076 4.8 LOS A 0.3 7.8 0.48 0.36 0.48 31.4 4 T1 All MCs 16 3.0 16 3.0 0.076 4.8 LOS A 0.3 7.8 0.48 0.36 0.48 32.0 14 R2 All MCs 2 3.0 2 3.0 0.076 4.8 LOS A 0.3 7.8 0.48 0.36 0.48 31.7 Approach 66 3.0 66 3.0 0.076 4.8 LOS A 0.3 7.8 0.48 0.36 0.48 31.5 West: HIDDEN PINES WAY
5 L2 All MCs 4 3.0 4 3.0 0.163 4.7 LOS A 0.7 19.0 0.36 0.20 0.36 32.9 2 T1 All MCs 143 3.0 143 3.0 0.163 4.7 LOS A 0.7 19.0 0.36 0.20 0.36 33.6 12 R2 All MCs 33 3.0 33 3.0 0.163 4.7 LOS A 0.7 19.0 0.36 0.20 0.36 33.3 Approach 180 3.0 180 3.0 0.163 4.7 LOS A 0.7 19.0 0.36 0.20 0.36 33.5 All Vehicles 804 3.0 804 3.0 0.309 5.2 LOS A 1.7 44.3 0.34 0.18 0.34 32.5 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement.
LOS F will result if v/c >1 irrespective of movement delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6).
Roundabout Capacity Model: US HCM 6.
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: Siegloch M1 implied by US HCM 6 Roundabout Capacity Model.
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, May 27, 2025 11:19:42 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
LANE LEVEL OF SERVICE
Lane Level of Service
Site: [2 (4)] HIDDEN PINES WAY/RAILROAD AVENUE PM EXISTING + PROJECT (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Approaches Intersection
South East North West
LOS A A A A A
Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Lane LOS values are based on average delay and v/c ratio (degree of saturation) per lane.
LOS F will result if v/c >1 irrespective of lane delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all lanes (v/c not used as specified in HCM 6).
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, June 24, 2025 10:15:19 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx
MOVEMENT SUMMARY
Site: [2 (4)] HIDDEN PINES WAY/RAILROAD AVENUE PM EXISTING + PROJECT (General)
Output produced by SIDRA INTERSECTION Version: 10.0.5.217 NA
Site Category: (None)
Roundabout
Site Scenario: 1 | Local Volumes
Vehicle Movement Performance
Demand
Flows
Mov Arrival Flows 95% Back Of Queue
ID
Turn Mov
Class
Deg.
Satn
Aver.
Delay
Level of
Service
Prop.
Qued
Eff.
Stop
Rate
Number
of Cycles
to Depart
Aver.
Speed
[ Total HV ] [ Total HV ] [ Veh. Dist ]
veh/h % veh/h % v/c sec veh ft mph
South: RAILROAD AVENUE
3 L2 All MCs 76 3.0 76 3.0 0.187 5.0 LOS A 0.9 22.1 0.39 0.23 0.39 32.0 8 T1 All MCs 29 3.0 29 3.0 0.187 5.0 LOS A 0.9 22.1 0.39 0.23 0.39 32.6 18 R2 All MCs 97 3.0 97 3.0 0.187 5.0 LOS A 0.9 22.1 0.39 0.23 0.39 32.4 Approach 201 3.0 201 3.0 0.187 5.0 LOS A 0.9 22.1 0.39 0.23 0.39 32.3 East: HIDDEN PINES WAY
1 L2 All MCs 118 3.0 118 3.0 0.326 6.0 LOS A 1.8 47.0 0.33 0.15 0.33 31.7 6 T1 All MCs 227 3.0 227 3.0 0.326 6.0 LOS A 1.8 47.0 0.33 0.15 0.33 32.3 16 R2 All MCs 44 3.0 44 3.0 0.326 6.0 LOS A 1.8 47.0 0.33 0.15 0.33 32.1 Approach 389 3.0 389 3.0 0.326 6.0 LOS A 1.8 47.0 0.33 0.15 0.33 32.1 North: RAILROAD AVENUE
7 L2 All MCs 52 3.0 52 3.0 0.089 5.1 LOS A 0.4 9.1 0.50 0.38 0.50 31.4 4 T1 All MCs 21 3.0 21 3.0 0.089 5.1 LOS A 0.4 9.1 0.50 0.38 0.50 31.9 14 R2 All MCs 2 3.0 2 3.0 0.089 5.1 LOS A 0.4 9.1 0.50 0.38 0.50 31.7 Approach 76 3.0 76 3.0 0.089 5.1 LOS A 0.4 9.1 0.50 0.38 0.50 31.5 West: HIDDEN PINES WAY
5 L2 All MCs 4 3.0 4 3.0 0.182 4.9 LOS A 0.8 21.6 0.37 0.21 0.37 32.8 2 T1 All MCs 149 3.0 149 3.0 0.182 4.9 LOS A 0.8 21.6 0.37 0.21 0.37 33.5 12 R2 All MCs 46 3.0 46 3.0 0.182 4.9 LOS A 0.8 21.6 0.37 0.21 0.37 33.2 Approach 199 3.0 199 3.0 0.182 4.9 LOS A 0.8 21.6 0.37 0.21 0.37 33.4 All Vehicles 864 3.0 864 3.0 0.326 5.4 LOS A 1.8 47.0 0.37 0.20 0.37 32.4 Site Level of Service (LOS) Method: Delay & v/c (HCM 6). Site LOS Method is specified in the Parameter Settings dialog (Options tab).
Roundabout LOS Method: Same as Sign Control.
Vehicle movement LOS values are based on average delay and v/c ratio (degree of saturation) per movement.
LOS F will result if v/c >1 irrespective of movement delay value (does not apply for approaches and intersection).
Intersection and Approach LOS values are based on average delay for all movements (v/c not used as specified in HCM 6).
Roundabout Capacity Model: US HCM 6.
Delay Model: HCM Delay Formula (Stopline Delay: Geometric Delay is not included).
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap.
Gap-Acceptance Capacity Formula: Siegloch M1 implied by US HCM 6 Roundabout Capacity Model.
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.
SIDRA INTERSECTION 10.0 | Copyright © 2000-2025 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ASSOCIATED TRANSPORTATION ENGINEERS | Licence: PLUS / 1PC | Processed: Tuesday, June 24, 2025 10:15:19 AM Project: J:\2025\JOBS\25031\LOS\01_HIDDEN PINES WAY_RAILROAD AVENUE.sipx HCS Two-Way Stop-Control Report
General Information Site Information
Analyst GOM Intersection HIDDEN PINES WAY/SOUTHERN DRIVEWAY Agency/Co. ATE Jurisdiction CITY OF SANTA MARIA
Date Performed 4/29/2025 East/West Street HIDDEN PINES WAY Analysis Year 2025 North/South Street SOUTHERN DRIVEWAY Time Analyzed AM PEAK HOUR Peak Hour Factor 0.70
Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description EXISTING + PROJECT
Lanes
Major Street: East-West
Vehicle Volumes and Adjustments
Approach Eastbound Westbound Northbound Southbound
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Volume (veh/h) 32 331 298 38 39 29
Percent Heavy Vehicles (%) 3 3 3
Proportion Time Blocked
Percent Grade (%) 0
Right Turn Channelized
Median Type | Storage Undivided
Critical and Follow-up Headways
Base Critical Headway (sec) 4.1 7.1 6.2
Critical Headway (sec) 4.13 6.43 6.23
Base Follow-Up Headway (sec) 2.2 3.5 3.3
Follow-Up Headway (sec) 2.23 3.53 3.33
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h) 46 97
Capacity, c (veh/h) 1077 330
v/c Ratio 0.04 0.29
95% Queue Length, Q₉₅ (veh) 0.1 1.2
95% Queue Length, Q₉₅ (ft) 2.6 30.7
Control Delay (s/veh) 8.5 0.5 20.4
Level of Service (LOS) A A C
Approach Delay (s/veh) 1.2 20.4
Approach LOS A C
Copyright © 2025 University of Florida. All Rights Reserved. HCS™ TWSC Version 2025 Generated: 6/24/2025 9:56:29 AM HIDDEN PINES WAY DRIVEWAY AM.xtw
AWD = 16.6 sec. (LOS C)
HCS Two-Way Stop-Control Report
General Information Site Information
Analyst GOM Intersection HIDDEN PINES WAY/SOUTHERN DRIVEWAY Agency/Co. ATE Jurisdiction CITY OF SANTA MARIA
Date Performed 4/29/2025 East/West Street HIDDEN PINES WAY Analysis Year 2025 North/South Street SOUTHERN DRIVEWAY Time Analyzed PM PEAK HOUR Peak Hour Factor 0.98
Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description EXISTING + PROJECT
Lanes
Major Street: East-West
Vehicle Volumes and Adjustments
Approach Eastbound Westbound Northbound Southbound
Movement U L T R U L T R U L T R U L T R
Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12
Number of Lanes 0 0 1 0 0 0 1 0 0 0 0 0 1 0
Configuration LT TR LR
Volume (veh/h) 18 170 273 27 25 17
Percent Heavy Vehicles (%) 3 3 3
Proportion Time Blocked
Percent Grade (%) 0
Right Turn Channelized
Median Type | Storage Undivided
Critical and Follow-up Headways
Base Critical Headway (sec) 4.1 7.1 6.2
Critical Headway (sec) 4.13 6.43 6.23
Base Follow-Up Headway (sec) 2.2 3.5 3.3
Follow-Up Headway (sec) 2.23 3.53 3.33
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h) 18 43
Capacity, c (veh/h) 1249 591
v/c Ratio 0.01 0.07
95% Queue Length, Q₉₅ (veh) 0.0 0.2
95% Queue Length, Q₉₅ (ft) 0.0 5.1
Control Delay (s/veh) 7.9 0.1 11.6
Level of Service (LOS) A A B
Approach Delay (s/veh) 0.9 11.6
Approach LOS A B
Copyright © 2025 University of Florida. All Rights Reserved. HCS™ TWSC Version 2025 Generated: 6/24/2025 9:58:17 AM HIDDEN PINES WAY DRIVEWAY PM.xtw
AWD = 10.5 sec. (LOS B)
HCS Two-Way Stop-Control Report
General Information Site Information
Analyst GOM Intersection RAILROAD AVENUE/EASTERN DRIVEWAY Agency/Co. ATE Jurisdiction CITY OF SANTA MARIA
Date Performed 4/29/2025 East/West Street EASTERN DRIVEWAY Analysis Year 2025 North/South Street RAILROAD AVENUE
Time Analyzed AM PEAK HOUR Peak Hour Factor 0.70
Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description EXISTING + PROJECT
Lanes
Major Street: North-South
Vehicle Volumes and Adjustments
Approach Eastbound Westbound Northbound Southbound
Movement U L T R U L T R U L T R U L T R
Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6
Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0
Configuration LR LT TR
Volume (veh/h) 4 15 13 44 82 7
Percent Heavy Vehicles (%) 3 3 3
Proportion Time Blocked
Percent Grade (%) 0
Right Turn Channelized
Median Type | Storage Undivided
Critical and Follow-up Headways
Base Critical Headway (sec) 7.1 6.2 4.1
Critical Headway (sec) 6.43 6.23 4.13
Base Follow-Up Headway (sec) 3.5 3.3 2.2
Follow-Up Headway (sec) 3.53 3.33 2.23
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h) 27 19
Capacity, c (veh/h) 884 1453
v/c Ratio 0.03 0.01
95% Queue Length, Q₉₅ (veh) 0.1 0.0
95% Queue Length, Q₉₅ (ft) 2.6 0.0
Control Delay (s/veh) 9.2 7.5 0.1
Level of Service (LOS) A A A
Approach Delay (s/veh) 9.2 1.8
Approach LOS A A
Copyright © 2025 University of Florida. All Rights Reserved. HCS™ TWSC Version 2025 Generated: 6/24/2025 10:02:01 AM RAILROAD AVENUE DRIVEWAY AM.xtw
AWD = 8.5 sec. (LOS A)
HCS Two-Way Stop-Control Report
General Information Site Information
Analyst GOM Intersection RAILROAD AVENUE/EASTERN DRIVEWAY Agency/Co. ATE Jurisdiction CITY OF SANTA MARIA
Date Performed 4/29/2025 East/West Street EASTERN DRIVEWAY Analysis Year 2025 North/South Street RAILROAD AVENUE
Time Analyzed PM PEAK HOUR Peak Hour Factor 0.98
Intersection Orientation North-South Analysis Time Period (hrs) 0.25 Project Description EXISTING + PROJECT
Lanes
Major Street: North-South
Vehicle Volumes and Adjustments
Approach Eastbound Westbound Northbound Southbound
Movement U L T R U L T R U L T R U L T R
Priority 10 11 12 7 8 9 1U 1 2 3 4U 4 5 6
Number of Lanes 0 1 0 0 0 0 0 0 1 0 0 0 1 0
Configuration LR LT TR
Volume (veh/h) 3 10 11 63 64 3
Percent Heavy Vehicles (%) 3 3 3
Proportion Time Blocked
Percent Grade (%) 0
Right Turn Channelized
Median Type | Storage Undivided
Critical and Follow-up Headways
Base Critical Headway (sec) 7.1 6.2 4.1
Critical Headway (sec) 6.43 6.23 4.13
Base Follow-Up Headway (sec) 3.5 3.3 2.2
Follow-Up Headway (sec) 3.53 3.33 2.23
Delay, Queue Length, and Level of Service
Flow Rate, v (veh/h) 13 11
Capacity, c (veh/h) 950 1526
v/c Ratio 0.01 0.01
95% Queue Length, Q₉₅ (veh) 0.0 0.0
95% Queue Length, Q₉₅ (ft) 0.0 0.0
Control Delay (s/veh) 8.8 7.4 0.1
Level of Service (LOS) A A A
Approach Delay (s/veh) 8.8 1.1
Approach LOS A A
Copyright © 2025 University of Florida. All Rights Reserved. HCS™ TWSC Version 2025 Generated: 6/24/2025 10:02:58 AM RAILROAD AVENUE DRIVEWAY PM.xtw
AWD = 8.2 sec. (LOS A)
.
W E
.
irbus DS
Geodata
d the GIS
unty of S
Map Mier
I/NA A, US
F'-'-----=-a=---1
e
•--=====:::JI _____ Feet
0 300 600 1,200
s ATTACHMENT J
EXISTING AND PROPOSED GENER AL PLAN DESIGNATION
N
• .
W E
.
s
---======-----Feet
0 300 600 1,200
ATTACHMENT J
EXISTING ZONING AND PROPOSED ZONING
1.0 General Concepts
1-1
1.0 GENERAL CONCEPTS
1.1 INTRODUCTION
The North Preisker Ranch Specific Plan is prepared as a continuation of the Santa Maria Sphere of Influence and Annexation Study. The Specific Plan area consists of 144 acres located at the northwest edge of the City south of the Santa Maria River. The Area was originally shown as Area 1 N and was evaluated in the Final Environmental Impact Report (September 1992) which has been recertified to include this specific plan.
1.1.1 Purpose of the Specific Plan
The specific plan directs future development, including the distribion on of land uses, the location and sizing of supporting infrastructure, site planning, architectural guidelines and methods of financing required public infrastructure. In this way, the specific plan will be useful in providing for future growth and understanding and mitigating the potential impacts of that growth in advance of any development.
1.1.2 Summary of Specific Plan Recommendations
Land Use. The North Preisker Ranch planning area is located at the northern edge of Santa Maria, in an area surrounded by residential uses to the south and east, agriculture land to the west, and open space (Santa Maria River) to the north.
Development under the plan would be consistent with the area's existing residential character. To this end, 64.4261.62 acres will be designated for low medium density residential (6 to 8 dwelling units/acre), 61.64 acres will be designated for low density residential (5 dwelling units/acre), 16.08 18.88 acres will be designated for community facilities (future K-8 school site and a future church site) and 4.35 acres will be designated recreation open space. [Resolution 2026-xxx and 2000-181]
Circulation. The planning area is not currently served by a circulation system. The area's planned road system will tie into the City's existing road network via Blosser Road, Hidden Pines Way and Railroad Avenue. The plan also calls for a network of bicycle and pedestrian paths which link the planned residential area to Preisker Park, Robert F Grogan Park and Rancho Verde subdivision. The existing Bradley Drainage Channel will serve as a crucial link in the proposed bicycle/pedestrian system.
ATTACHMENT K
1.0 General Concepts
1-2
Community Design. Noteworthy aspects of these guidelines include neotraditional community planning parameters focused on architecture and infrastructure design which reflect street scenes reminiscent of small town America. In addition, the use of energy-efficient architecture and site planning and an emphasis on the use of landscaping in the design of land use buffers and corridor landscaping will be incorporated.
Infrastructure. The residential uses proposed under the North Preisker Ranch Specific Plan will necessitate new water sewerage and drainage infrastructure. A network of water and sewer pipelines needed to serve the residential area will connect to the City's existing system south and east of the planning area. A sewer main will be extended from Blosser Road which will connect to the existing ten (10") sewer "dry line" in Hidden Pines Way The construction of this main line will allow the existing Park Place Sewer Lift Station to be decommissioned. The new sewer system will serve both the planning area and the new and existing areas on both sides of Hidden Pines Way to Preisker Lane. The area's drainage needs are currently served by the Bradley Channel and Blosser Retardation Basin.
1.1.3 Organization of the Document
This document contains four components which guide planned policies and programs and establish development standards as a means of ensuring their implementation. The components include,
• 1.0 General Concepts:
Reviews the planning area's environmental opportunities and constraints, and includes overall goals and objectives for the plan.
• 2.0 Land Development Pattern:
This section contains the recommendations for the planning area's land use, circulation community design, and infrastructure systems. • 3.0 Land Development Regulations.,
Details the regulatory framework and development standards which drive the plan and contains architectural, landscaping and site design standards for projects within the planning area.
• 4.0 Implementation and Administration:
Includes development phasing and financing, the entitlement approval procedures, land use controls and maintenance mechanisms to implement this plan.
ATTACHMENT K
1.0 General Concepts
1-3
1.1.4 Project Location
The North Preisker Ranch planning area is located at the northern end of the City of Santa Maria approximately two and a half miles north of the City's central core.
Upon annexation, the planning area will comprise the northern most parcels found in the city beyond which lie the Santa Maria River and San Luis Obispo County.
Figure 1 -1 shows the planning area's location in relation to the City and its sphere of influence,
The planning area is roughly square in configuration and is bounded by the Santa Maria River Levee between Blosser Road (extended) and Railroad Avenue (extended), the Blosser Drainage Channel just west of the proposed Blosser Road alignment, the Bradley Drainage Channel to the south, and the PG&E. right-of-way and highpower lines to the east which are adjacent to the Hidden Pines Estates Subdivision. Figure 1-2 shows the boundaries of the planning area in relation to existing and proposed roadways.
The existing basins to the south are within the City limits and are part of the Hidden Pines Specific Plan which was adopted on July 19, 1994.
The North Preisker Ranch planning area includes the Blosser Ditch., Santa Maria Levee and Bradley Ditch.
1.1.5 Relationship to the City of Santa Maria General Plan The North Preisker Ranch Specific Plan guides development in an area that is, as of this writing, outside of the City's corporate boundary. Upon annexation, the North Preisker Ranch planning area would come under the jurisdiction of the City of Santa Maria, and all relevant citywide goals, policies, and programs of the City's General Plan would apply.
In accordance with state law, the North Preisker Ranch Specific Plan has been prepared to be completely consistent with the City’s General Plan. By definition, a Specific Plan includes a greater level of detail, especially with respect to site planning and development issues, than can be found in the master document from which it takes its direction. In this way, the Specific Plain can be seen as a bridge between the General Plan and the zoning ordinance.
ATTACHMENT K
1.0 General Concepts
1-4
Figure 1 -1
1.0 General Concepts
1-4
Figure 1 -1
1.0 General Concepts
. . . . . .
S""** *"
144DJ4}4118144414114141J411444
I IDDEN PINES WAY
2 SPHERE OF
INFLUENCE
TAYLOR STREET
L J LuJ
� � 2 � �
' 5 �
e � �
� z □
c O
Cc □ oz
± 0 a
� c
DONOVAN ROAD
North Preisker Ranch Specific Plan
PLANNNG AREA LOCATION Smith'Techs USA
I N C O R P O R A T I D
Figure 1 -1
1-4
ATTACHMENT K
1.0 General Concepts
1-5
Figure 1 -2
[Resolution 2000-181]
1.0 General Concepts
1-5
Figure 1 -2
[Resolution 2000-181]
1.0 General Concepts
\!= ============f
F
= = ==== = ===== = = =,-1 I I II I I I I II I I i } ii {i I I II I I I II 11 l i � 1 cHURcH � A
1 � 11 1l
I L _),L__________ _ __ _J,I
I ---- uhur__ ?p iers__yr_----?
I I I I I I I J
I � � � )
l � l � I �
1 z � g i i
l(
i � : � r I
�=S
==
C
=
H
==O==O =
L
:::::::::::'.-1
i i {I
I I p � l
iz i � i n
1 � I � 1l
j � I � j4
I3I � 1
1 �1 1 l
I I I I
I � � � � "-
I J I I / � � �
LEGEND
P A R K
-Plonning Arco Boundories
S Existing Rood*oy
1-5
::::�:::::.:i) Pro;,cstd Rooc•oy
Nor\h Preiskcr Ranch Specihc Plln
SmitbTechs USA
1 X C D R P O R � I 1 �
Figure 1 -2
[Resolution 2000-181]
ATTACHMENT K
1.0 General Concepts
1-6
1.1.6 Relationship to Hidden Pines Specific Plan
Hidden Pines Specific Plan - The North Preisker Ranch Specific Plan is being prepared pursuant to the City's Sphere of Influence Boundary. Like the Hidden Pines plan, the North Preisker Ranch plan establishes development standards and development phasing. Consequently, the North Preisker Ranch Specific Plan bears a close relationship to the Hidden Pines plan and other specific plans resulting from the Sphere of influence Study.
The North Preisker Ranch Development Phasing Schedule (Table 4-1) will be designed to provide the necessary services to allow for development of the North Preisker Ranch Specific Plan area independent of the Hidden Pines Specific Plan area.
1.1.7 Relationship to County Plans and Policies
Santa Barbara County Comprehensive Plan. The City of Santa Maria must coordinate closely with the County of Santa Barbara as well as the Santa Barbara County Local Agency Formation Commission (LAFCO) in its effort to annex the North Preisker Ranch planning area. As a result of this process, future development in the planning area must be consistent with the Santa Barbara County Comprehensive Plan, the governing document for development throughout the County. Although strictly speaking the policies contained in that document apply only to the County’s unincorporated areas, the City must be cognizant of these policies when developing specific plans for areas it wishes to annex. Indeed, consistency with County policies forms a major criterion on which LAFCO bases its decisions regarding annexation of unincorporated areas into cities.
Local Agency Formation Commission Policies. The Santa Barbara County Local Agency Formation Commission, or LAFCO, establishes standards designed to promote efficient and orderly development within urban areas. Since LAFCO has the power to approve or deny land annexation requests, it is critical that cities comply with LAFCO policies when developing specific plans for areas under consideration for annexation. A summary of these policies follows:
Discourage Urban Sprawl. LAFCO policies are geared tovvard orderly and logical development. To ths end, land annexations must be physcally contiguous to existing city limits In addition, annexations must be within a city's sphere of influence. The project area is within the cry's sphere of influence and adjacent to existing development.
Protection ofAgricultural Lands. LAFCO Policy IV states that:
ATTACHMENT K
1.0 General Concepts
1-7
.. agricultural resources and support facilities should be given special consideration in sphere of influence designation. High value agriculture areas ... should_not be included in an urban service sphere of influence. Because the sphere study found a low agricultural suitability for those areas to be developed under the North Preisker Ranch Specific Plan, the plan is in conformance with this LAFCO policy. The last agricultural preserve contract on the property expires on January 1, 1999.
1.1.8 Relationship to EIR/Mitigation Measures
As stated previously, the North Preisker Ranch Specific Plan is prepared pursuant to the Sphere. Study Final Environmental impact Report (FEIR). As such policies and standards contained in this specific plan incorporate those mitigation measures deemed by the FEIR as necessary to reduce environmental impacts resulting from this project to a less than significant level. For example, water and open space conservation measures contained in this plan are a direct result of the recommanddions of the FEIR. State law (CEQA, Fevised 1996) requires the City to evaluate EIR information that is over five years old. The City must either update the EIR or make findings that the EIR is still revelant. The following discussion of the area's environmental opportunities and constraints highlights many of the mitigations that are integrated into this plan.
1.2 ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS
Effective planning requires a basic understanding of a variety of envirornmental issues affecting land development. The Sphere Study and FEIR evaluate the opportunities and constraints facing the area slated for development under the North Preisker Ranch Specific Plan. A summary of thal: information is presented below.
1.2.1 Land Use
The North Preisker Ranch planning area is generally bounded by the Blosser (west) and Bradley (south) drainage channels, the Santa Maria River (north) arid Railroad Avenue (east). The plan area is located at the northwest edge of the City of Santa Maria in an area generally dominated by agriculture and new home subdivisions.
The northeast plan area abuts the west end 207 unit Hidden Pines Estates subdivision. The Santa Maria River Levee dominates the parcel's northern boundary. The area to the west reflects several agricultural uses. The Blosser Retardation Basin and residential senior mobilehome parks are to the south.
The uses proposed by this Specific Plan include standard and small lot single-family residential units, an elementary school, church and recreational
ATTACHMENT K
1.0 General Concepts
1-8
facilities. The amended Sphere Study found that such uses would be compatible with the existing scale of development and would not result in significant land use conflicts.
1.2.2 Circulation
There are several existing roads that will serve the development of the planning area. Railroad Avenue was extended in early 1992, and the Railroad Avenue Bridge was constructed in 1990. These improvements provide access to the easterly boundary of the project area. The planned improvements will create additional access from the southwest by extending Blosser Road north. Both roads will be tied into the extension of Hidden Pines Way through the plan area. In addition to vehicular access, pedestrian and bicycle access from the East along the drainage channel and form the proposed multi-purpose trail will serve the plan area. To provide traffic control and area definition, modern roundabouts will be incorporated at three intersections.
1.2.3 Infrastructure
Water. Although an existing eight-inch pipeline is available at the southern boundary of the planning area, no extensions have been made into the area itself.
Future residential development will necessitate the construction of water main lines per the direction of Mr. Dwayne Chisam (Utilities Manager for the City of Santa Maria). Development will generate water demand of approximately 236 AFY (210,955 gallons per day) in the North Preisker Ranch planning area.
Wastewater. A new trunk line will be constructed along Blosser Road and Hidden Pines Way to serve the plan area and the areas served by the Park Place Sewer Lift Station. There are smaller sewer lines at Railroad and Vista del Rio, south of the area. The sewer capacity reports prepared by John Carcllo Engineers indicate that under full development, the sewer trunks from this area would be surcharged, would not be adequate for the anticipated demand and would need improvements.
These improvements will be installed per the development schedule.
Drainage. The entire North Preisker Ranch planning area has recently been removed from the 100-year floodplain, as defined by the Federal Emergency Management Agency (FEMA). A brief summary of the area's existing drainage facilities follows.
ATTACHMENT K
1.0 General Concepts
1-9
Three major drainage facilities serve the North Preisker Ranch area: Blosser Channel, Bradley Channel and the Blosser Retardation and Groundwater Recharge Basin. Santa Barbara County Flood Control officials assert that the Blosser Channel and accompanying Retardation Basin could accommodate a 100-year flood.
1.2.4 Agriculture
The planning area processes poor agricultural soil but is able to support "miniature vegetables" such as kale, kohlrabi, endives and sugar peas. The FEIR found that conversion to urban use of this area would result in a significant but mitigable impact. The plan area has no prime soil. Consequently, development in the North Preisker Ranch Planning area would not significantly alter the agricultural opportunities present.
1.2.5 Geology and Soils
Due to the presence of the surface trace of the Santa Maria Fault some 1,500 feet southeast of the site, the City of Santa Maria's Safety Element (1995) locates the Planning Area in Ground Shaking Zone A, the zone subject to the greatest risk in the event of an earthquake. The Santa Barbara County Comprehensive Plan assigns this area a "low to moderate" risk based on its geologic, seismic and soil characteristics. Further, the County's document considers the area to have low liquefaction, landslide and expansive soils potential. The FEIR finds that such conditions would not pose an undue hazard to future development at the proposed scale and intensity and assigns a "low" risk to this area.
1.2.6 Biological Resources
The planning area is of low biological sensitivity due to the ongoing agricultural operations onsite and the disturbed nature of the surrounding area. The FEIR states that no significant biological resources are expected to be affected by the proposed development.
1.2.7 Noise
The North Preisker Ranch planning area is adjacent on two sides with existing residential development. Limited agricultural uses are located to the west. The proposed residential development is not expected to adversely impact existing uses adjacent to the site. Furthermore, because the site is not located near any major note sources such as U.S. Highway 101 or the airport, proposed residential development will not be significantly impacted by traffic note.
ATTACHMENT K
1.0 General Concepts
1-10
1.2.8 Visual Resources
Visual features of the North Preisker Ranch planning area are an eucalyptus tree windrow and agricultural fields in the west and distant mountain ranges in the east and north. The adjacent southwestern parcel features a retention/recharge basin, which during rainy winter months becomes the dominant foreground visual landmark. The FEIR found no significant visual impact is anticipated.
The development planned will incorporate onsite features as part of the open space system. Residential development proposed will not be of a scalee or intensity that would adversely affect distant views.
1.2.9 Cultural Resources
Archaeological investigations have revealed no evidence of cultural resources, indicating that the area is suitable for development Similarly, no historic artifacts exist in the area.
1.3 GOALS OF THE SPECIFIC PLAN
The preparation of the North Preisker Ranch Specific Plan fulfills the intent of General Plan Land Use Objective 4h, which calls for specific development studies for areas having unusual development constraints or opportunities not easily accommodate by the provisions of the General Plan. To quote directly:
"Certain portions of the planning area ... should be designated as special study areas [because]…they offer the possibility of particularly beneficial land use patterns which may enhance community objectives. "
Further, the General Plan seeks to implement this objective through the preparation of:
"...Specific development studies [which outline] detailed commitments to capital improvements, and [recommend] special development standards for the area.
North Preisker Ranch, an area not yet fully integrated into the City's infrastructural fabric, qualifies in this regard. Because of its largely undeveloped character, future development here requires special attention in order to properly address the unique locational and environmental concerns of the 144-acre planning area.
ATTACHMENT K
1.0 General Concepts
1-11
The goals of the North Preisker Ranch Specific Plan, while designed to address local environmental opportunities and constraints, must also be consistent with the established goals of the Santa Maria General Plan. These goals are listed here:
1. It shall be the goal of the North Preisker Ranch Specific Plan to provide residential opportunities to help meet the housing needs of the growing population of the City of Santa Maria. In accordance with General Plan Goal H. 1, it is the City's goal to provide decent, affordable housing for all economic segments of the community.
2. It shall be the goal of the North Preisker Ranch Specific Plan to reflect the residential character of the adjacent residential areas in north Santa Maria. To this end, small single-family lots and standard single-family lots shall I be encouraged.
Specific objectives, policies and programs relating to each issue area 'e.g., circulation, land use) will be addressed in those sections.
ATTACHMENT K
2.1 LAND USE PLAN
2-1
2.0 LAND DEVELOPMENT PATTERN
Successful planning depends on the close coordination of land use, circulation, infrastructure and community design. Consequently, this section presents separate plans covering each of those elements, with accompanying policies and, programs guiding their implementation. Although written as individual plans, they are actually four components of a single planning framework which implements the goals established in Section 1.3 of this Specific Plan.
2.1 LAND USE PLAN
The Land Use component of the North Preisker Ranch Specific Plan defines the objectives, policies and programs for development of new land uses which achieve the goals of the Specific Plan. The City of Santa Maria General Plan Land Use Element (adopted 2026 1991 and amended 1993) provides the point of departure from which the land use designations and development standards of this Specific Plan are made The Land Use component establishes:
Pattern. Categories, mix, and arrangements of land uses permitted within the North Preisker Ranch Community, and their distribution; and Parcelization. Policies regarding residential lot size to ensure the affordability of single-family housing units in the community.
2.1.1 Overall Development Pattern
While development under the North Preisker Ranch Specific Plan represents a departure from the area's current agricultural land use pattern, it is designed to be compatible with surrounding land uses to accommodate future residential growth arid minimize impacts on the environment. Figure 2-1 shows the locations of the land uses proposed for the North Preisker Ranch planning area, while Figure 2-2 illustrates the corresponding zoning for these areas.
Table 2-1 summarizes the proposed land uses in the planning area SP Designation Zoning. Acreage
Low Medium Density Residential (LMDR) PD/RSL-1 65.4261.6 2 Low Density Residential (LDR) PD/R-1 61.64
Community facilities (CF) PD/PF 16.2
18.00 Recreation Open Space (ROS) OS 4.35
Includes Right-of-Ways shown on Figure 2-1
[Resolution 2026-xxx; 2000-181]
ATTACHMENT K
2.1 LAND USE PLAN
2-2
Figure 2-1
[Resolution 2000-181]
LAND USE DESIGNATION
LMDR Low Medium Density Residential
LDR Low Density Residential
CF Community Facilities
ROS Recreation Open Space
LAND USE MAP
LMDR
ATTACHMENT K
2.1 LAND USE PLAN
2-3
Figure 2-2
[Resolution 2000-181]
PD/R-2
ZONING DESIGNATION
PD/R-1 Planned Development/ Single Family
Residential
PD/RSL-1 Planned Development/ Small Lot
Single Family Residential
PD/R-2 Planned Development/ Medium Density
Residential
OS Open Space
PD/PF Planned Development/ Public Facilities
ZONING MAP
ATTACHMENT K
2.1 LAND USE PLAN
2-4
2.1 LAND USE PLAN
The City's General Plan provides the basis of the Specific Plan Designations outlined in Table 2-1 These designations are fully consistent with the General Plan, and are defined as follows:
Low Medium Density Residential (LMDR) The LMDR designation requires residential densities that are responsive to the need to provide land-efficient, affordable housing on small lots, while maintaining the character of a single-family neighborhood. Allowed Uses include single-family detached units with an overall (average) density not to exceed 8.0 units per acre, with variable lot sizes for single-family detached units. The 65.4261.62 acre portion of the southern half of the North Preisker Ranch planning area reflects this designation. Development under this land use designation must be in conformance with the provisions of the PD/RSL-1 and PD/R-2 zones as established in Sections 3.1.1 and 3.1.3 of this Specific Plan. [Resolution 2000- 181]
Low Density Residential (LDR). The LDR designation requires residential densities that are responsive to the need to provide land -efficient; affordable housing. Allowed uses include single-family dwelling units with an overall (average) density not to exceed 5.0 units per acre. The 61.64 acre northern portion of the North Preisker Ranch planning area reflects this designation.
Development under this land use designation must be in conformance with the provisions of the PD/R-1 zone as established in Section 3.1.2 of this Specific Plan. [Resolution 2000-181]
Community Facilities (CF). The CF designation allowed public uses such as an elementary school campus and church. The centrally located 15.48 acre portion and 3.4 acre portion of the North Preisker Ranch planning area reflects this designation. Development under this land use designation must be in conformance with the provisions of the PD/PF zone as established in Section 3.1.1 of this Specific Plan. [Resolution 2026-xxx; 2000-181] Recreation Open Space (ROS). The ROS designation includes existing and proposed recreational facilities, including neighborhood, community, and regional parks, bikeways, jogging paths and selected public utility rights-of-ways. The 4.35 acre portion of the North Preisker Ranch planning area reflects this designation. [Resolution 2000-181]
2.1.2 Land Use Objectives, Policies and Programs
Objective: Allow for affordable residential development on small and standard size lots while preserving the character of the surrounding neighborhood.
ATTACHMENT K
2.1 LAND USE PLAN
2-5
Policy LU 1 - Accommodate the following land use types in the North Preisker Ranch planning area, in accordance with the Land Use Plan presented as Figure 2-1:
- Open Space: Recreation Open Space
- Residential: Low Medium Density Residential
Low Density Residential
- Community Facilities: Elementary School
Church
Programs
- LU 1.1 -- Revise the acreage of the various land use and zoning designations shown on Table 2-1 based on a more detailed survey of the property. [Resolution 2000-181]
Policy LU 2 - Provide residential uses that are affordable, structurally safe, aesthetically pleasing and environmentally sound.
Programs
- LU 2.1 -- Apply development standards contained in Sections 3.1.1, and 3-1.2, and 3-1.3 of this Specific Plan to all lands within the North Preisker Ranch planning area designated as PD/R-2 (Planned Development/Medium Density Residential), PD/RSL-1 (Small Lot Single-Family Residential) and PD/R-1 (Single-Family Residential).
LU2.2- Adhere to circulation, community design and infrastructure standards contained within Section 3.0 (Land Development Regulations) of this Specific Plan.
Policy LU 3 - maintain the designated open space for drainage and flood control purposes as well as passive recreation opportunities
Programs
- LU 3.1 - Apply development standards contained in Section 3.1.3 of this Specific Plan to all lands within the North Preisker Ranch planning area zoned as OS (Open Space).
- LU 3.2 -- Verify the establishment of a maintenance program (new or existing) available to maintain open space areas and that the subsequent development will "pay its proportionate share" of the associated costs. - LU 3.3 -- Recognize the Santa Maria River Levee front as an urban edge that should include the levee bikeway, access to the bikeway and linear parkway landscaping to the extent that abovementioned amenities would not preclude scope maintenance and emergency access as determined by the Santa Barbara Flood Control and Water Conservation District Policy LU 4 Provide architectural controls, which define a nontraditional theme reflecting classic architectural styles.
ATTACHMENT K
2.1 LAND USE PLAN
2-6
- LU 4.1 -- Apply development standards contained in Sections 3.1.1, 3.1.2,
3.1.3, and 3.1.54 of this Specific Plan to A lands with the North Preisker Ranch planning area zoned as PD/RSL-1 (Small Lot Single-Family Residential), PD/R-1 (Single-Family Residential), PD/R-2 and PD/PF (Public Facilities).
- LU 4.2 -- Utilize the existing Planned Development Permit process to review and approve architectural design, sitting and community theme.
ATTACHMENT K
2.2 CIRCULATION PLAN
2-7
2.2 CIRCULATION PLAN
The circulation system proposed under the North Preisker Ranch Specific Plan is intended to provide safe and convenient access to the developments within the planning area. Figure 2-3 shows how the proposed system relates to the roads and bikeways planned for the areas immediately surrounding the planning area. (Note that implementation of the planning areas circulation system assumes that the necessary linkages outside the area are made.) The following sections describe the greater detail the components of the area's circulation system. Table A-1 in Appendix A provides an estimate of the cost of these improvements.
This document is for illustrative purposes and, while intended to aid the reader in assessing the nature and scope of such elements, is not intended to be inviolate.
It is intended that traffic control on public streets will be funded and constructed by individual developments as development occurs. Although the specifics of these elements will vary in relation to the needs and impacts associated with each individual development, traffic controls, as a general rule (under "standard" circumstances), will be designed to meet the parameters of City of Santa Maria Standard Specifications and Drawings and Design Standards. The design and timing of traffic control installation will undergo review and approval by the City Engineer in a manner consistent with long established practice and accepted Caltrans traffic control warrant criteria. Modern roundabouts will be constructed at three intersections within the development.
In addition to financing the construction of circulation infrastructure within and adjacent to the Specific Plan area, project applicants will be required to pay the AB1600 Traffic Mitigation Fee in accordance with the adopted fee schedule approved by the Santa Maria City Council. Credits as well as financial assistance may be given for regional improvements as determined by the City Engineer.
Street Alignments. The North Preisker Ranch planning area is located just north and west of the boundary of the City of Santa Maria. The planning area is situated between the Blosser Road alignment to the west, Railroad Avenue and Hidden Pines Estates (a 207-unit residential development to the east), the Santa Maria River Levee to the north and the Blosser Retention Basin and developing residential areas to the south. The planning area will be served by the northerly extension, of Blosser Road, Ryanton Avenue and Railroad Avenue, in addition to Hidden Pines Way. Segments of these road-way sections have recently been completed in conjunction with the residential subdivision developments occurring south of the planning area. Figure 2-4 shows the preliminary alignments proposed for the roadway extensions within and adjacent to the planning area. This figure also delineates the functional classification of each roadway section. As shown in Figure 2-4, Blosser Road would be extended as a Secondary Arterial across the Blosser Drainage Ditch then north to Hidden Pines Way then reduced to a Local street north to the base of the levee. [Resolution 2000-181]
ATTACHMENT K
2.2 CIRCULATION PLAN
2-8
Figure 2-3
[Resolution 2000-181]
2.2 CIRCULATION PLAN
2-8
Figure 2-3
[Resolution 2000-181]
1 °000000000°
NORTH PREISKER RANCH
PLANNING AREA
2.2 CIRCULATION PLAN
SM-GUADALUPE DUNES
BIKEWAY (MPT-I)
D
IDDEN PINES WAY &
TAYLOR STREET abusadthedisoosa4an4Ihabedhoio i �sgiubspiioi [istboio&soiliualine4Bui}o4in1Pk9 )a44dbilozuldpeiniehlliaslasuui@IDakvniiuunannuuni@etu4bbetolbu44nu4I)I4L%41%14
SYSTEM COMPONENETS
Planning Area Roadways
Existing Roadways Outside Planning Area
00° Multi-Purpose Trail (I)
Multi-Purpose Trail (II)
Class Il Bikeway
North Preisker Ranch Specific Plan
CIRCULATIONSYSTEMN LOCAL CONTEXT Smith'Tech*USA
I N C O R P O R A T I D
2-8
Figure 2-3
[Resolution 2000-181]
ATTACHMENT K
2.2 CIRCULATION PLAN
2-9
Figure 2-4
[Resolution 2000-181]
2.2 CIRCULATION PLAN
2-9
Figure 2-4
[Resolution 2000-181]
2.2 CIRCULATION PLAN
Figure 2-4
o foEl'.. S>,1-C [Resolution 2000-181] o o o o o ,..,, ,uc-c- E 000 OOOOD00000600000 D O O O O O C O O O O D�I'(..;) 000000000 0 r-::=---•--•-- ooooocooooocicooaooo - • .,. o
1 q - ----...---- --- •000�00000000000
.. ------ --- l ! 7
, 1 1 L 1
l I I
�t _ -----1!.!.!. !..,_- - --L- !.'...!..!!. - - .J.!. - - - - __l 1 ! , i
J l PARK'
1 � : '
� l coooeooooc J
• ....J � S C H O O L � '"'1
/c:,J ;::.. � ::::1
j 1'. -.::: 1 0 �, • ; 0 C C C .0 0 0 C C O C O � I> 0 e O C O c e C O O C � �, ! 1 0 �
� :,.·_ � ,' 0
:'.":; �, �cocccooocoo 0 00000 l l
�! � �
�i � � · '-":: i c::: tq
I '-'.>)
·Q:
,�
J f
i !
j. :.. ----------
S. B. F. C iJ.
JJRA!JIACE
1 1
-------------
JXJ�---Sfi?Il ,. - cc,c ccc:cccco,ccccccccccco,occcoo J : 1
�OJ..DWAY CLASS!FICATlO;-,'
- - - Lo:ol l,fr,O(
- - - - I oc ol
- - - - r\t:Sider,!io! Co'ler ior Rood
- ·- ·- Seccnoory Arle-iol
ciKE /PEDES"GI/-J� PAil-iS
cceecco lh:!i-?u7cse 1roil (1)
. . . .............. · 1.1:.il\i-?vr;:-c�e Trcil (l:)
ORCULATON PLAN SmilbTec�USA
l'.'!C0?1'0i11lD
2-9
ATTACHMENT K
2.2 CIRCULATION PLAN
2-10
Ryanton Avenue would also be as a Residential Collector along its existing alignment to Hidden Pines Way and would reduce to a Local street north Hidden Pines Way. Western Avenue would not cross the Bradley Channel; however, pedestrian access would be provided across the canal. Terminating vehicular access at Western Avenue and the Bradley Channel is supported by the traffic study provided by Associated Traffic Engineers dated March 19, 1998. This change to the circulation element responds to Residents on Western Avenue south of the canal who are concerned about existing vehicular traffic.
Railroad Avenue has already been extended to Hidden Pines Way as a Residential Collector and would reduce to a Local street north of Hidden Pines Way, Hidden Pines Way would extend as a Residential Collector across the planning area and end at the intersection with Blosser Road These three roadways would provide access to the major commercial employment centers located south and east of the planning area, within the City of Santa Maria in addition to the north-south roadway extensions, Hidden Pines Way (a Residential Collector Roadway) would be constructed, thus forming an efficient circulation system capable of serving the North Preisker Ranch development. [Resolution 2000-181] Development will begin in the eastern portion of the planning area and progress west as the demand requires. With the first phase of development, sanitary, and storm sewers as well as domestic water pipelines will be extended as shown in Section 4. 3. Section 4.3 of this plan (Development Phasing Program) addresses circulation phasing in more detail.
Bicycle Circulation. Bikeways improve bicycling safety and convenience, help accommodate motor vehicle and bicycle traffic on shared roadways, and help to encourage bicycling as an alternative transportation mode. Four bikeway classifications are used in the City:
Multipurpose Trail -1 (MPT-1). Multipose trails are paths designed to accommodate both bicycle and pedestrian traffic. Such paths are generally not less than eight feet wide, and are divided into bicycle and pedestrian lanes. The MPT-1 designation applies to multi-purpose trails, which follow corridors not in proximity to existing roadways. An MPT-1 might follow a drainage channel or traverse a park, for example. Multi-purpose trails replace the "Class I Bikeway" designation formerly used by the City.
Multipurpose Trail (MPT-2) Similar to MPT-1, a Multi-Purpose Trail-2 is a dedicated eight foot wide pedestrian/bicycle path. However unlike the former designation, the meandering MPT--2 is constructed within parkways adjacent to public roadways. The MPT-2 is generally used in conjunction with a Class 11 Bikeway, where it provides an alternative for recreational bicyclists who wish to avoid riding on the street.
ATTACHMENT K
2.2 CIRCULATION PLAN
2-11
Class 11 Bikeway (Bike Lane). Class II bikeways (bike lanes) for preferential use by bicycles are established within the paved area of streets and highways. Bike lane stripes are used to promote an orderly flow of traffic by establishing specific lines of demarcation between areas reserved for bicycles and lanes to be occupied by motor vehicles.
Class III Bikeway (Bike Route). Class III bikeways (bike routes" are shared facilities which serve either to provide continuity to other bikeway facilities (usually Class II bikeways), or designate preferred routes through high demand corridors. In either case, bicycle use is secondary Class III bikeways are normally established by placing Bike Route signs along roadways, and no pavement marking or delineation is typically required.
The implementation of bikeways within the planning area would encourage residents in the area to cycle to employment centers, schools, parks and open space areas along preferred routes. Bikeways within the planning area would also serve to provide continuity with the existing bikeway system in this portion of the City Figure 2-4 shows conceptual alignments and class designation for the bikeways proposed within the North Preisker Ranch planning area. A number of Multi-purpose trails will be constructed in and around the area, including a MPT-1 pathway along the Bradley Channel and through the residential area east of Blosser Road and north of Hidden Way with a MPT-2 path along Rosser Road and a MPT-1 path along Railroad Avenue. The north-south paths along Blosser Road and Railroad Avenue are designed to connect with the proposed Santa Maria Levee Bikeway. Class ll bikeways will also be incorporated into the Blosser Road and Railroad Avenue right-of-ways.
Pedestrian Circulation. All planned roadways within the planning area would be constructed with pedestrian sidewalks on both sides of the street. In addition, multi-purpose trails shown on Figure 2-4 will function as pedestrian paths as well.
The purpose is to promote non -vehicular transportation modes as alternative travel choices.
The pedestrian facilities within the planning area would also tie in to the surrounding developed area, thus providing convenient routes between residences, commercial developments, schools, parks and transit stops.
Public Transportation. The Santa Maria Area Transit (SMAT operates the public transit facilities within the City ff, Santa Maria and the neighboring communities of Orcutt and Guadalupe Route 2 of the SMAT system currently provides continuous 30 minute service to the existing residential areas located, just south of the North Preisker Ranch planning area-Saturday service is provided every 60 minutes by Route 2 to these areas. Transfer to other routes in, the SMAT system is possible both on weekdays and Saturdays during the times Route 2 is in operation- Figure 2-5 shows the current SMAT service routes within the Santa Maria-Orcutt area.
ATTACHMENT K
2.2 CIRCULATION PLAN
2-12
2.2 CIRCULATION PLAN
2-12
st4AT
Santa Maria Area Transit
805-928-5624
314 West Cook Street, Suite 7
Santa Maria, CA 93458
LEGEND
Route l-A ••••• • • Route 1-B
Route 2
Route 3
Route 4
Route 5
Route 7
• Time Point
• Bus Stop
Transfer Point
� Bike Locker
N
E
± YMCA
2.2 CIRCULATION PLAN
••
§ °33 � � School
-II"**aims � • ±-9le
• � � Saint
Joseph's
0 ° • s -•�
s
• • oKnouo
� Patterson Rd. t •
•• • • • •\
cum A« [5. o•.*
T :"."ts& ' 555CS.- Rice Ranch Rd. �
SANTA MARIA AREA
TRANSIT ROUTES Figure 2-5
2-12
ATTACHMENT K
2.2 CIRCULATION PLAN
2-13
It is anticipated that Route 2 would be expanded to serve the North Preisker Ranch planning area if the proposed residential uses generate substantial transit demands. The expansion of Route 2 would logically include service to Preisker Park as well.
The need to bus turnouts or other transit-related improvements with the area, or along roadways which abut the area, would be determined by SMAT and the City of Santa Maria Public Works Department.
2.2.2 Circulation Objectives, Policies and Programs
Objective: The North Preisker Ranch circulation system should provide safe and convenient access to the developments located within the planning area while encouraging the use of alternative transportation modes by residents of the planning area.
Policy CIRC 1 -- Designate and align roadways such that an orderly flow of motor vehicle traffic is achieved within the planning area.
Programs
- CIRC 1.1 - Construct the roadways within the area as shown in Figure 2-4, and designate those roadways as follows:
Secondary Arterial: Blosser Road (to Hidden Pines Way)
Residential Collector: Railroad Avenue (Canal Street to Hidden Pines Way)
Hidden Pines Way
Canal Street
Local Street: Cesar Chavez Drive (Canal Street to
Hidden Pines Way) [Resolution 2000-181]
Note: Remaining roadways within the planning area will be Alternate Local Minor (see Figure 3-7)
- CIRC 1.2 - Roadways shall be designed and constructed in accordance with the typical plans and sections shown in Figures 3-4, 3-5 and 3-6. -- CIRC 1.3 -- Construct modern roundabouts within the area as shown in Figure 2-4.
Policy CIRC 2 -- Provide pedestrian sidewalks on both sides of all Secondary Arterial, Residential Collector and Residential Local roadways.
Program
- CIRC 2.1 - Allocate adequate right-of-way in accordance with the typical plans and sections shown in Figures 3-4, :3-5 and 3-6 for pedestrian sidewalks along all proposed planning area roadways.
ATTACHMENT K
2.2 CIRCULATION PLAN
2-14
Policy CIRC 3 - Provide a safe and efficient bikeway system to serve the transportation and recreational needs of the residents of the planning area.
Program
- CIRC 3.1 - Construct mufti-purpose trails within the planning area along the alignments depicted in Figure 2-4. These pathways would be striped and signed according to existing City standards.
Policy CIRC 4 - Provide facilities for and encourage the use of public transit as an alternative commute choice for planning area residents.
Programs
- CIRC 4.1 - Expand SMAT service into the planning area if estimated demand for such service is sufficient.
- CIRC 4.2 - Construct transit-related improvements such as bus turn-outs as deemed necessary by SMAT and the City of Santa Maria Public Works Department.
ATTACHMENT K
2.3 COMMUNITY DESIGN PLAN
2-15
2.3 COMMUNITY DESIGN PLAN
Landscape, architecture and streetscape elements provide the visual and functional cohesiveness needed to turn an ordinary specific plan into something truly unique. Indeed, without attention to community design, an otherwise good plan will fail simply because people do not find the planning area to be attractive. Consequently, the following section establishes policies and programs that ensure a desirable setting for future development in the North Preisker Ranch planning area.
2.3.1 Proposed Community Design Components
The unique physical layout of the planning area allows for some interesting community design possibilities. The 4.35-acre open space park area will be landscaped and improved for public enjoyment of recreational uses such as roller hockey, volleyball, basketball and tennis. Appendix A provides a cost estimate for proposed community design improvements described. [Resolution 2000-181]
ATTACHMENT K
2.3 COMMUNITY DESIGN PLAN
2-16
Figure 2-6
[Resolution 2000-181]
2.3 COMMUNITY DESIGN PLAN
2-16
Figure 2-6
[Resolution 2000-181]
2.3 COMMUNITY DESIGN PLAN
2-16
Figure 2-6
[Resolution 2000-181]
2.3 COMMUNITY DESIGN PLAN
nN
PCs
Y 1 D D £ Y � P 1 N I S r 1 �
-ECs1RN/
� KE PATA
€
�
C
6 6 h 0 0 L
LEGEND
Ee_g vuti-Purpose Tc@ ( I )
E Poiti-Purpose Tca ( II )
-O- Zoundcboul In'sections
[ ] amp locations
a � Pe<estmen ends-
< Connect lo clher Arecs
COMMUNTY DESIGN PLAN
2-16
Nor5
6l T Y
PA R K
RN
P2Es
Preisler Ranch Specific Pl±n
Smitb'Tech&USA
1 N C o R P O R � 7 I D
Figure 2-6
[Resolution 2000-181]
ATTACHMENT K
2.3 COMMUNITY DESIGN PLAN
2-17
2.3 CUMMUNITY DE51ON PLAN
Railroad Avenue Linear Parkway. The existing Railroad Avenue linear parkway will be extended northward along the existing Railroad Avenue right-of-way to the base of the Santa Maria River levee at which ramps will be provided for access to the levee bikeway. This 40-foot wide park-way will feature a multi-purpose trail and landscaping, which will riot only buffer neighboring residential uses from street noise, but also serve as a functional link in the area's transportation system. Figures 3-11 and 3-12 in Section 3.3 (Community Design Guidelines) show a conceptual treatment for this parkway.
Railroad Avenue Parkway Access. The east side of Railroad Avenue within the plan area includes an extension of the parkway that runs under the Pacific Gas & Electric high-tension transmission lines. The Hidden Pines Specific Plan area to the east will incorporate a pedestrian/bicycle access way linking internal street system to the parkway system. (See Figure 3-12) Bradley Channel Pedestrian/Bicycle Access way. The Bradley Channel will incorporate a pedestrian/bicycle access way, which will ultimately link Preisker Park to the east to the Bob Grogan Park to the west. The residential community planned for the northeast 20 acres of the Hidden Pines planning area will incorporate a pedestrian/bicycle access way linking its internal street system to this parkway system. This access way must have a minimum width of 30 feet, and must be centrally located between Railroad Avenue and the western boundary of the residential portion of the Hidden Pines planning area. (See Figure 3-11)
North Preisker Ranch Bikeway System. The North Preisker Ranch Specific Plan will provide an extensive system of multi-purpose trails, which will link residential development with recreational areas (Figure 2-6). Not only will this recreational pedestrian/bikeway system help reduce local auto tips, it will function as the aesthetic backbone of the community. And by providing direct access between residential neighborhoods and local designations without having to access roads, this transportation system also promotes transportation safety
North Preisker Ranch Residential Area. This 124 acre area is the predominant land use within the planning area. In order to provide a traditional town setting, the street alignments reflect a grid pattern with parkways and lot sizes, which include 45'x 100' (minimum) zero lot-line lots and 60'x 100' (minimum) standard lots. Affordability and design of single-family homes will be enhanced by the opportunity to create an environment of classic residential architecture within feasible economic Parameters.
ATTACHMENT K
2.3 COMMUNITY DESIGN PLAN
2-18
2.3.2 Community Design Objectives, Policies, and Programs Objective: Enhance community character through the use of aesthetically pleasing and water conserving streetscapes, on-site landscaping, and land use buffer edges within designated landscape areas.
Policy CD1 - Designate landscaped areas, which establish an aesthetically pleasing continuous open space system that facilitates a bicycle/pedestrian circulation system.
Program
-- CU 1.1 - Designate the following as landscaped areas within the North Preisker Ranch planning area as shown on Figure 2-6.
- Open Space Park and Trails to Bob Grogan Park
- North Preisker Ranch Bike-way System
- Railroad Avenue! Linear Parkway
- Santa Mafia River Levee (60) Linear Parkway
Objective: Enhance community character through the use of site sensitive, traditional residential design.
Policy CD 2 -- Establish guidelines for traditional residential design - CD 2.1 -- Designate the following general architectural styles as representative of the character of the planning area.
- Chalet Style
- English Tudor
- English Cottage
- Colonial Revival
- Spanish Colonial
- Mission Revival
- Prairie Style
- Victorian
- Arts and Crafts Style
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-19
2.4 INFRASTRUCTURE PLAN
The Infrastructure section of the North Preisker French Specific Plan establishes standards and guidelines for the locations and sizes of necessary water services, sewer lines, and storm drainage improvements. Table A-3 in Appendix A summarizes these improvements and provides an estimate of their construction costs; all costs are preliminary until such time as the detailed engineering documents and drawings are complete.
The identification of the location and size of public infrastructure elements within this document is based on site-specific studies and, while intended to aid the reader in assessing the nature and scope of such elements, is not intended to be inviolate.
It is intended that public infrastructure elements to serve localized needs and address localized impacts will be funded and constructed by individual developments as the local areas develop. Although the specifics of these elements will vary in relation to the needs and impacts associated with each individual development, the elements will, as a general rule (under "standard" circumstances), be designed to meet the parameters and constraints of City of Santa Maria Standard Specifications and Drawings and Design Standards. These design elements will undergo review and approval by the City Engineer in a manner, consistent with long established practice. Examples of such elements are sewer mains and water mains.
Public infrastructure elements intended to serve area-wide or "regional" needs and address such impacts are currently under study These elements are typically of a scope beyond the ability or means of an individual development or developer to construct and will necessitate concerted effort and financing measures to realize. Examples of such elements include water transmission lines, sewer trunk lines, sewer treatment plant expansion, extension of off-tract arterial roadways, and regional drainage facilities.
2.4.1 Proposed Infrastructural Improvements
Water System. The 144-acre planning area includes residential development as well as community, recreational, and conservation facilities. All areas within the planning area will be served by extending the existing water mains as shown on the Water System Plan(see figure 2-7). Pipelines to the project area can be fed from either director, and should be looped and valved so that a minimum number of residences can be served and no more than one fire hydrant would be out of water if flow in one of the lines is lost. While the configuration of the streets is available, the exact location and length of each water line will not be known until final design has been completed. Design of all water facilities will be in accordance with the City of Santa Maria Public Works and Water Department requirements.
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-20
The project water demand for this development is (272,278 gpd x 365 days/yr)/325,851 gal/af = 305 afy. Consequently, only ultra-low toilets and low flow showerheads shall be used in the project. Every effort should be made to encourage water conserving landscape and irrigation systems throughout the development.
Although the City of Santa Maria state water allocation does not indude the planning area, there is sufficient water at buildout.
Although the proposed development will add to the overall demand on the system, the existing water system facilities (pumps, wells, reservoirs and transmission mains) are capable of meeting the estimated increase without modification. All cost estimates will be adjusted when the actual location and sizes of Me proposed waterlines, have been determined.
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-21
Figure 2-7
[Resolution 2000-181]
2.4 INFRASTRUCTURE PLAN
2-21
Figure 2-7
[Resolution 2000-181]
2.4 INFRASTRUCTURE PLAN
iC°
I
I
I I ' I I ---.---------- --, ·
I I I I
I I I : I
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
I
I
I
I
' I I I I I I I I I , i] il il M lil M
"il _i] ."I °
ol • t • I '
c:::,I c:, 1 'c::I col <01 10 :
j
- "°'I c:::>t I I I I I
I' I I
I I I
I I
1 I
I I
I
I I I I I I I
I I I ' I I : ' I ' I
I ' I • I
il I
II
III II
I «==� �
I I I ' I I I I I I I I I I ' I I ' I ' I I I ' I I I
I ' I ' I ' ' '
I I I I I I I
I I
I I '
1 I
I
I
� wNECT T0 ES1
12° P© 11326.1
(PPAR ST. STUB
I I I I I I I I I I I I I I ' I I I I I I • I I I J I ' I I 1 - 10 � � -1 0°- � .1 0 °' � 10 �� ,- ---r-----•EJl)..!Jl.Jr---- --�--- -i---- J-p-;:xrs-'-----_ .. -----------t � sEcT 10 Esn
--...-. i0" PVC 11343.07
� � 1
�
� � �
�
il it l {il I l!l
PuRr I_
I 1 {4 1 � � �
°] .41 • I .bl • 91 * 1 I
� � ! l � oil i
� � w1 4 1 !I I �
i
1l 1l bI {] l] � � � st 8 0 o l-. '
� · I I l
' I :::::: I ---✓ I
c,;, , , 1 , .._, , f
r - - -1
it iI KI RI iI � [4 if � I I I I I .. I I I I illSul hf Mi � ) � � 'il � � il, s 2
� il nI I T
� =- -I 1l lii
l bi l I} 11 <" µ
ill I {I I � " • J i] � � '41 I I 1
· I '-' I
I c:;
3I
6 1
991*1 1+ . i1 1 hf I {l lil �� lil I lil 1 12 � 4 4
5 3
Li .
i i a n
: : :
j
: ,: : : : : :,_--1--✓ :
I I I ·
�-•- I I E'-----" ,_ I I [hl Ji {1 1-------------------.-----.-----. • 1 � � � � � �
i hl [l l4 "-'
cc � _i
l � l � e:\/ � 1 � ¢ 9 ii c2 s
4 i
LEGEND
-- - -- Proposed Wcler
...-......... Existing Woler
( RIDDEN PINES WAT
CONNECT T0 DOSTNG
10° PYVC 11227.07
(RALRCAD AO@VUE)
CONNECT T0 EXIST7NG
10 AT RANCHO VERDE
I1155.16 (BLOSSER ROAD
WATER SYSTBM PLAN Smith'Techs US
I X C 0 R P 0 I 1 I I D
Nori Preirker Rapcb Sp- cine Pl:n
2-21
Figure 2-7
[Resolution 2000-181]
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-22
Sewer System. The North Preisker Ranch planning area is estimated to generate an average wastewater flow of 17,254 (GPD) and a peak flow of 0.94 cfs. The Sewer Capacity Analysis by john Carollo Engineers (April 1986) showed several lengths of the nearest sewer trunk (Garden Drive South Trunk) to be overloaded when the City is fully developed within its borders. This trunk flows to the DeJoy Trunk Sewer, which is also near capacity. Since the Carollo report was prepared, the City has expanded is borders to encompass the Hidden Pines Annexation Area #71. That area includes the Hidden Pine subdivision (207 dwelling units), Rancho Buena Vista Mobile Home Park (210 dwelling units), Park Place Mobile Home Park (134 dwelling units) and a Jehovah's Witness Kingdom Hall (1,000 seats).
A 10" main in Hidden Pines Way was installed as part of the Hidden Pines subdivision. The North Preisker Ranch project will construct a sewer trunk from the southern point of connection at Blosser Road through the planning area to the existing 10” main in Hidden Pines Way (which terminates at Railroad Avenue) This planning area is bounded by Blosser Road to the west, the Santa Maria River Levee to the north, the Bradley Channel to the south and Railroad Avenue to the east.
The Santa Maria Municipal Code allows the developer to subrnit a reimbursement map for approval in order to recoup the costs associated with providing additional capacity over and above that required to serve the planning area.
According to the Hidden Pines Specific Plan, the gravity line must be financed and constructed prior to the completion of infrastructure improvements in the initial phase of development in this planning area. These improvements shall be included in the infrastructure costs section. Prior to recordation of the initial subdivision map, an improvement plans related to the sewer trunk in Blosser Roadway is approved by the City.
The impact of the project sewer loves on the timing of DeJoy Phase II improvements is uncertain at this time. Prior to construction of the Blosser sewer trunk, said impact will be verified to the satisfaction of the City Engineer.
The open space area is not expected to generate significant sewage.
A conceptual sewage collection System is shown in Figure 2-8 in order to illustrate the basic requirements and to provide a general estimate of the cost (see Appendix A for a calculation of the projected cost estimate). The cost estimate will be adjusted when the actual location of manholes and length of pipelines have been determined through the subdivision process.
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-23
Figure 2-8
[Resolution 2000-181]
2.4 INFRASTRUCTURE PLAN
2-23
Figure 2-8
[Resolution 2000-181]
2.4 INFRASTRUCTURE PLAN
I
2 I
I i
I: ·-� I
I
I
i
l :
I I
I I I
13 � 1
I
I
4 I
I
� I
4 I
1 *I
I
I
I
I
I
I
- t
i
I
I � I
6 � I
'
-{
I
i
I
I
I
I
� I
. I
I
I
I
I
S ( E b D l
2�---� � ---� I I
l [1
I I
{l -il IR
' I I
I I I
{I kt �
.I] Ji
l Ji
� __-
c 8 U A c E
P 1 � I
-4..±.4_.Jl .
-ii - i'
I il h EL
ijf � 2I I
i� �
l {ii I}1 ." l � I �
- � � 1I
I': •i; 1: l:□n·□: :
1 a 1 119
:::: It !' I' I ' I· I � &a i!! {} M I I �
l 1I5 s s <:
' ,I• I' I - -------'---�----.L.
� lll l J!- � � ii II z I I' � 1] � / l !El �
L/ 51 �
� LEGEND I
I
(
I
I
I
I
'
I
I
I
I
'
Tm CONNECT 70 E x 5nsG
1E" S_ ,re'SDUT-a z7SJ
Proposed Sever
Ex:siing Sewer
SEW6SY8TB/AN
� ��
SmylbTechgUSI
I X C p I 7 � Z 1 I I �
Figure 2-8
[Resolution 2000-181]
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-24
Storm Drainage System. The planning area is generally bounded by storm drainage channel at the west and south. The entire planning area will drain directly into the Santa Barbara Flood Control District retardation basin adjacent to the south. The planning area slopes in a westerly direction having an elevation differential of only seven feet across the parcel with a maximum gradient of about 0.3 percent. The SBFCD retardation basin is an important "area-wide'; topographic. and drainage feature. This basin receives flows from the Blosser and Bradley drainage ditches and outlets to the north through an extension of the Blosser Ditch and eventually drains to the Santa Maria River. Presently, the planning area is used as open space or for agriculture production. According to the Federal Emergency Management Agency, the area is riot within the 100-year flood plain.
The existing 15 acre open space basin will be incorporated into the existing 25 acre Santa Barbara Flood Control District retardation basin adjacent to the west by removing the levee which currently divides them, The increased capacity of the expanded retardation basin will greatly enhance the overall efficiency of this "area-wide" drainage System The material which separates to the two basins, will be excavated and placed on the western portion of the planning area to furt1her ensure efficient drainage of the planning area. The Santa Barbara Flood Control District has agreed to accept the above-described plan pending submittal of improvement plans.
The area storm drain system will extend from the SBFCD retardation basin north to the central portion of the planning area and then extend east to serve the initial phase of development as well as subsequent phases. For purposes of estimating and illustration, the main backbone system is shown. Design of the drainage system will be in accordance with the City of Santa Maria Public Works Department and the Santa Barbara Flood Control District requirements.
Proposed and existing drainage improvements for the planning area are shown on Figure 2-9. Table A-3 provides a cost estimate for these improvements.
Design of proposed drainage improvernents are approximated based on Santa Barbara County Flood Control District and Water Conservation District standard design procedures. A 25-year storm frequency was used to size the storm drains. It is the intent of the Santa Barbara County Flood Control District and the City of Santa Maria to make use of regional retardation facilities whenever possible. The 'Flood Control District may allow retardation at the County-owned Blosser Basin or may require "in-lieu" improvements to be constructed within the system. In this case, retardation capacity is assumed to be provided by the expanded Blosser Retention/Retardation Basin.
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-25
Figure 2-9
[Resolution 2000-181]
2.4 INFRASTRUCTURE PLAN
2-25
Figure 2-9
[Resolution 2000-181]
sl
I
I
I
I
I
I
I
I
I
• I cl "z
L±
�
�
�
�
�
s
� I
I
2.4 INFRASTRUCTURE PLAN
I
I
-\Ar � -
P I R I
� s c I D o l -1-
LEGEND
Frepcstd Storm D:oin
ci
s
� i
:l
STORM DRAIN PLAN SaithTee5RsUSA
1 x C � I � ◊ I 1 T 1 �
2-25
Figure 2-9
[Resolution 2000-181]
ATTACHMENT K
2.4 INFRASTRUCTURE PLAN
2-26
2.4.2 Infrastructural Objectives, Policies and Programs Objectives. To achieve a framework for the developmemt of appropriate infrastructure to accommodate the land uses proposed in the North Preisker Ranch planning area.
Policy INF -- Achieve a framework for development of water services for both domestic and fire protection uses.
Programs
- INFI.1 - Provide water services in accordance with the improvements depicted in Table 43 and Figure 2-7 of this Specific Plan subject to modification by detailed engineering studies at the time of development. - INF 1.2 - require low-flow toilets and showerheads in all residential units. - INF 1.3 - implement water-conserving landscape design standards established in Section 3.3 of this Specific Plan.
- INF 1.4 - implement infrastructural improvements in accordance with financing and maintenance mechanisms established in Section 4.0, (implementation and Administration) of this Specific Plan.
Policy INF 2 - Achieve a framework for development of an efficient and sanitary sewer system.
Program
- INF 2.1 - Provide a sewer system in accordance with the improvements depicted in Table A-3 and Figure 2-8 of this Specific Plan subject to modification by detailed engineering studies at the time of development. - INF 2.2 - implement infrastructural improvements in accordance with financing and maintenance mechanisms established in Section 4.0, "Implementation and Administration", of this Specific Plan.
Policy INF 3 -- Achieve a framework for development of an efficient storm drainage system-Program
- INF 3.1 - Provide a storm drainage system in accordance with the improvements depicted in Table A-3 and Figure 2-9 of this Specific Plan subject to modification by detailed engineering studies at the time of Development.
- INF 3.2 - Implement drainage improvements in accordance with financing and maintenance mechanisms described in Section 4.0, "Implementation and Administration", of this Specific Plan.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-1
3.0 LAND DEVELOPMENT REGULATIONS
This component of the Specific Plan identified regulatory standards governing development in the North Preisker Ranch planning area. Just as Section 2.0 established the area's patten of land use, circulation, community design and infrastructure, this section develops standards by which those plans must be implemented. As with the previous section, development regulations are divided into land use, circulation, and community design and infrastructure components.
3.1 LAND USE STANDARDS
The City of Santa Maria Zoning Ordinance provides much of the basis of private land development regulations, under the North Preisker Ranch Specific Plan. Fiveour zone districts are established by this plan: Single-Family Small Lot Residential (PD/RSL-1), Single-Family Residential (PD/R-1), Medium Density Residential (PD/R-2), Open Space (OS), and Community Facilities (CF). Each zone district would be located within a Planned Development (PD) overlay zone unless the City zoning ordinance would suffice. Figure 2-2 shows the boundaries of these zones within the planning area.
The standards described below in Sections 3.1.1 - 3.1.2 in effect replace the Zoning Ordinance for some development in the North Preisker Ranch planning area. In cases where standards of similarly-named districts of the Zoning Ordinance and Specific Plan conflict, the Specific Plan standards take precedence. However, where these standards fail to fully address an issue, the provisions of the City's Zoning Ordinance will apply.
3.1.1 Low Medium Density Single-Familly Small Lot Residential (PD/RSL-1) Zone Standards
This section describes the development standards of the Single-Family Small Lot Residential (PD/RSL-1) zone. Figure 3-1 illustrates how these standards might be applied to a conceptual development project.
a. Purpose. The PD/RSL-1 is intended to establish and maintain a traditional singe-family theme for the planning area and permit a suitable environment for single-family living on a scale representative of a traditional neighborhood by permitting 4,500 s.f. Minimum lots with special residential and yard requirements while at the same time maintaining adequate individual open space. It is intended that the PD/RSL zone be used in conjunction with the City of Santa Maria Zoning Ordinance (RSL-1 zone).
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-2 (Ordinance 2001-07)
3.0 LAND DEVELOPMENT REGULATIONS
3-2 (Ordinance 2001-07)
�
I
O
o
� o
5 5
5 O
cD
�
�
�
I
�
I
Houses on corner lots shall be setback a minimum of 19-ft. from Interior lots shall have a minimum area of 4,500 sq. ft. the side property line adjoining the street and 5 ft. from the interior and a minimum width of 45 ft. property line. 1Garages located on the rear half of the lot shall be setback not less than 5 ft from interior side and rear property lines.
These garages may be detached or attached to the house.
When the garage is located on the front half of the lot the rear � yard setback of single and two story houses shall be a minimum of � 20 ft The setback for a single story structure may be reduced to When the garage is located on the back half of the lot
the rear yard setback of single and two story houses
shall be a minimum of 15 ft.
Ti
a
�
I
co
�
�
15 ft provided no more than 20 ft. of the rear width of the structure is projecting into the required 20 ft setback,
- + -----------
1 CC&R's shall include provisions that require
parkways to be landscaped with ground cover or
grass.
Corner lots shall have a minimum area of 5,000
sq. ft. and a minimum width of 50 ft.
North Preisker Ranch Specific Plan
�
49 MIH.
� � 9
9 2
�
�
�
45IA.
�
/
9 -----------+--
I
Garages shall
be located at
least 18 ft.
behind the back
of sidewalk.
�
�
�
�
z
�
Front yard setbacks shall be a minimum of 24 ft from back of curbl Note: Area between back of sidewalk and back of curb shalt be except garages must also be setback at least 30 ft from the back placed within a minimum 12 ft. wide easement for trees, utilities of curb. The front of the garage must also be a minimum 6 ft and access. behind the occupied portion of the dwelling and 8 ft. behind back o sidewalk. Maximum building height is 25 ft.
On interior lots both side yards shall be a minimum of 5 ft �
m
�
m
Ir
0 U
E
m
z
-I
2o
m
o
□
1 �
I
SINGLE FAMILY SMALL RESIDENTIAL (RSL-1) ZONE STANDARDS
MINIMUM LOT SIZE CONFIGURATIONS NOTTO SCALE
0 z
�
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-3
b. Permitted Uses. The following uses are permitted in the PD/RSL-1 district:
(1) Home occupations subject to a home permit. See Chapter 29 of the Zoning Ordinance
(2) Single-Family dwelling.
(3) Crop and tree farming.
(4) Care of non-related persons (six [6] or less persons) (5) Keeping household pets, avairies, and greenhouses for domestic or hobby use. The keeping of roosters, goats, sheep, pigs, horses, cows, or similar animals is specifically prohibited.
(6) Small family day care home (six (6) persons or less). c. Conditional Uses. The following uses and those similar uses which the planning commission finds to fall within the intent and purpose of the zone, that will not be more obnoxious or detrimental to the public welfare, are found by the commission to be compatible with adjoining land uses, and which are of a comparable nature and of the same class enumerated in this section, shall be permitted subject to obtaining a Condtional Use Permit according to the procedures set forth in Article 2 of Chapter 35 of the Zoning Ordinance. (1) Churches;
(2) Child day care centers:
(3) Public and private schools;
(4) Large family day care homes.
d. Accessory Buildings. Accessory buildings shall be permitted in the PD/RSL-1 district subject to compliance with all requirements set forth in Chapter 27 of the Zoning Ordinance.
e. Minimum Parcel Size. Each interior lot shall have a minimum area of not less than four thousand five hundred (4,500) square feet and a minimum width of not less than forty five (45) feet. Each corner lot shall have a minimum area of five thousand (5,000) and a minimum width of not less than fifty (50) feet.
The City Council, through a subdivision map, may create lots smaller than specified above, provided the overall density of the project is consistent with the general plan.
f. Maximum Building Height. Maximum allowable building height is twenty-five (25) feet. [Ordinance 2000-16]
g. Setbacks. All required yard setbacks are measured from the lot property lines.
Yard measurements on lot lines abutting rights-of-way assume a lot
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-4
line based on the ultimate standard design right-of-way as set forth in this Specific Plan.
(1) Front yard shall be no less than twenty four (24) feet deep, measured from back of curb, except as follows:
(a) Garages shall be setback a minimum of thirty (30) feet from the front property line and eighteen (18) feet from the back of sidewalk to avoid vehicles overhanging the sidewalk. Garages with side entry may be setback not less than fifteen (15) feet from the front property line. The front of the garage must be recessed a minimum of six (6) feet from the front of the occupied portion of the dwelling. Exception: Garages containing heavy timber trellises, arbors, and columns containing vines may be setback four (4) feet from the front of the dwelling, but must still maintain eighteen (18) feet from the sidewalk. [Ordinance 2000-16] (b) Front porches, balconies, bay windows and patios shall not be less than twenty-two (22) feet from the front property line. Front porches cannot exceed the width of the front elevation.
Balconies, bay windows and patios cannot exceed 50% of the elevation width, including the garage elevation. [Ordinance 2000-16] (2) Side Yards:
(a) On interior lots, both side yards shall be a minimum of five (5) feet in width. [Ordinance 2001-07]
(b) On a corner lot, the setback shall be nineteen (19) feet from the house to the side property line adjoining the street; the other side yard shall be no less than five (5) feet. Garages with access from the side street shall not be closer than eigliteen (18) feet from the back of sidewalk. [Ordinance 2000-16]
(3) Rear Yards. Rear yards setbacks shall be as follows:
(a) For a single-story or two-story structure, the setback shall be not less than twenty (20) feet, except as follows:
(1) The setback for a single-story structure may be reduced to fifteen (15) feet provided that no more than twenty (20) feet of the rear width of the structure is projecting into the required twenty (20) foot setback. [Ordinance 2001-07]
(2) When the garage is located on the rear half of the lot, the rear yard setback of the house shall be not less than fifteen (15) feet. [Ordinance 2001-07]
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-5
(b) For a garage located on the rear half of the lot, the setback shall be not less than five (5) feet for the garage. [Ordinance 2000-16] h. Parking. For provisions on parking, see Chapter 32 of the Zoning Ordinance i. Signs. For provisions on signs, see Chapter 34 of the Zoning Ordinance. j. Noise. Residential structures adjacent to arterial or collector streets shall comply with either one of the following:
(1) The recommendations contained in an acoustical report prepared by an acoustical expert acceptable to the community development department;
(2) The installation of solid-core doors and double-glazed windows on all openings in the elevation of a structure facing the arterial or collector streets roof vents facing arterial or collector streets shall be baffled in a manner acceptable to the zoning administrator.
k. Architectural and Aesthetic Standards. Residential structures are to be designed to reflect traditional styles in an effort to provide an interesting architectural mix and aesthetic harmony within the neighborhood as a whole.
See Section.3.2, "Exterior Design Requirements." For exterior elevation examples see Figure 3-3-
3.1.2 Low Density Single-Family Lot Residential (PD/R-1) Zone Standards This section describes the develop merit standards of the Single-Family Residential (PD/R-1) zone. Figure 3-2 illustrates how these standards might be applied to a conceptual development project.
a. Purpose. The PD/R-1 designation is intended to establish and maintain a traditional single-family theme for the planning area and permit a suitable environment for single-family living on a scale representative of a traditional neighborhood by permitting 6,000 s.f. minimum lots with special residential design and yard requirements while at the same time maintaining adequate individual private open space. It is intended that the PD/R-1 zoning be used in conjunction with the City of Santa Maria Zoning Ordinance (R-1 zone)
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-6
b. Permitted Uses. The following uses are permitted in this PD/R-1 district:
(1) Home occupations subject to a home use permit. Chapter 29 of the Zoning Ordinance;
(2) Single-Family dwelling;
(3) Crop and tree farming;
(4) Care of non-related persons (six [6] or less persons); (5) Keeping of household pets, aviaries, and greenhouses for domestic or hobby use. The keeping of roosters, goats, sheep, pigs, horses, cows, or similar animals is specifically prohibited;
(6) Small family day care home (six (6) or less persons). c. Conditional Uses. The following uses and those similar, uses which the planning commission finds to fall within the intent and purpose of this zone, that will not be more obnoxious or detrimental to the public welfare, are found by the commission to be compatible with adjoining land uses, and which are of a comparable nature and of the same class enumerated in this section, shall be permitted subject to obtaining a Conditional Use Permit according to the procedures set forth in Article 2 of Chapter 35 of the Zoning Ordinance. (1) Churches;
(2) Child day care centers;
(3) Public and private schools;
(4) Large family day care homes;
d. Accessory Buildings. Accessory buildings shall be permitted in the PD/R-1 district subject to compliance with all requirements set forth in Chapter 27 of the Zoning Ordinance.
e. Minimum Parcel Size. Each interior lot shall have a minimum area of not less than six thousand (6,000) square feet and a minimum width of not less than fifty (60) feet, except that lots at the curve in a knuckle or cul-de-sac may be forty (40) feet wide. Each comer lot shall have a minimum area of not less than six thousand five hundred (6,500) square feet and a minimum width of not less than sixty-five (65) feet.
The City Council, through a subdivision map, may create lots smaller than specified above, provided the overall density of the project is consistent with the general plan.
f. Maximum Building Height Maximum allowable building height is twenty-five (25) feet. [Ordinance 2000-16]
g. Setbacks. All yard measurements are made from the lot property lines.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-7
(1) Front yards shall be no less than twenty four (24) feet deep, except as follows:
(a) Garages will be setback a minimum of six (6) feet from the front of the residential structure.
(b) Garages may be. located at the rear of the lot with a fifteen (15) foot (minimum) wide driveway access.
(c) Front porches, balconies, bay windows and patios can be ten (10) feet from back of sidewalk at front yard setback and five (5) feet from back of sidewalk at side yard. Front porches can not exceed the width of the front elevation. Balconies, bay windows and patios can not 50% of the elevation width. [Ordinance 2001-18] (2) Side Yards.
(a) On interior lots, side yards shall be a five (5) feet in width. (b) On a corner lot, the setback shall be ten (10) feet from the side property line adjoining a Residential Collector or nineteen (19) feet from the side property line adjoining a Residential Local or Alternate Local Minor; the other side yard shall be five (5) side yard.
(3) Rear Yards. Rear yard setback shall be as follows:
(a) For single-story or two-story structures, the setback shall be not less than fifteen(15) feet, except as follows: the setback for a single-story structure may be reduced to ten (10) feet provided that no more than twenty (20) feet of the rear width of the structure is projecting into the required fifteen (15) foot setback. ; (b) For a garage located on the rear half of the lot, the setback shall be not less than five (5) feet. [Ordinance 2000-16]
h. Parking. For provisions on parking, see Chapter 32 of the Zoning Ordinance, i. Signs. For provisions on signs, see Chapter 34 of the Zoning Ordinance,
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-8
(Ordinance 2001-18)
3-8
3.0 LAND DEVELOPMENT REGULATIONS
3-8
(Ordinance 2001-18)
3-8
Corner lots shall have a minimum of 6,500 sq. ft.
with a minimum lot width of 65' feet.
00 Note: Area between back of sidewalk
and back of curb shall be placed
within a twelve foot wide easement
for trees, utilities and
North Preisker ' , Specific Plan
18' ft. minimum driveway
with roll up door.
65' MIN.
5 •
y
60 Interior lots shall have a minimum area of 6,000 sq. ft. with a minimum lot width of 60 feet.
.
�
�
�
o
�
60' MIN.
�
�
�
o
◊
�
Interior lots shall provide minimum of
5' ft. sideyards.
Maximum building height is 25' feet.
G'
3.0 Land Development Regulations
Rearyard setback for accessory buildings
shall not be less than 5' feet from rear property
line.
For a garage located on the front half of the lot
J
the setback shall be not less than 15' feet for
single-story or two-story structures
Corner lots shall provide a 10' foot
sideyard adjacent to the street
65' MIN. adjoining a residential collector
Corner lots shall provide a 19' foc
sideyard adjoining a residential lo
or alternate local minor.
+
�
�
I
�
z
�
U
m
�
m
I
0 U
�
m
%
I
o
m
o
Porches, bay windows, balconies and patios :=
may encroach into the setback up to 2' feet. �
CC&R's shall include provisions that require
parkways to be landscaped w/ groundcover
or grass.
0 z
CD
SINGLE FAMILY STANDARD LO .ESIDENTIAL (R-1) ZONE STANDARDS MINIM NOTTO SCALF IM I NT I7E CANEIQIIRATINN
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-9
3.0 LAND DEVELOPMENT REGULATIONS
3-9
3.0 LAND DEVELOPMENT REGULATIONS
3-9
3.0 LAND DEVELOPMENT REGULATIONS
North Preisker Ranch
□ □ m
Colonial Revival
·nf5tol· • -�·
French Provencial
� --- □I □
Victorian
English Tudor
EXTERIOR ELEVATION EXAMPLES
NO SCALE
figure 3-3
3-9
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-10
3.0 LAND DEVELOPMENT REGULATIONS
3-10
3.0 LAND DEVELOPMENT REGULATIONS
3 North Preisker Ranch
,
l
� y..jn. � µ
�
�
= �·
�
�
� - i ++1 • �--
-
=-
-------- -
"-r 1IA" ff=\ ·----- ------
Arts & Crafts Styfe
EXTERIOR ELEVATION EXAMPLES
NO SCALE
3-10
Figure 3-3a
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-11
j. Noise. Residential structures adjacent to arterial or collector streets shall comply with either one of the following:
(1) The recommendations contained in an acoustical report prepared by an acoustical expert acceptable to the community development department;
(2) The installation of solid-core doors and double-glazed windows on all openings in the elevation of the structure facing the arterial or collector streets. Roof vents facing arterial or collector streets shad be bailed in a manner acceptable to the zoning administrator.
k. Architectural and Aesthetic Standard. Residential structures we to be designed to reflect traditional styles in an effort to provide an interesting architectural mix and aesthetic harmony with the neighborhood as a whole. See Section 3.3.2, "Exterior Design Requirements." For exterior elevation examples see Figure 3-3 and 3-3a.
3.1.3 Medium Density Residential (PD/R-2) Zone Standards This section describes the development standards of the Medium Density Residential (PD/R-2) zone.
a. Purpose. The PD/R-2 zone is intended to stabilize and maintain the residential character of the district and permit a suitable environment for family living on a smaller scale by permitting a higher density with two (2) families to the lot while maintaining individual privacy, open space, and facilities. b. Permitted Uses. The following uses are permitted in the R-2 district:
(1) Single-family dwellings when they meet all requirements set out in the R-1 district; (2) Duplexes;
(3) Two (2) detatched dwelling units;
(4) Home occupations subject to a home use permit. See Chapter 29 of the Zoning Ordinance;
(5) Care of nonrelated persons (six or less persons);
(6) Small family day care homes;
(7) Keeping of household pets, aviaries and greenouses for domestic or hobby use; such structures shall comply with provisions contained in the Zoning Ordinance, Chapter 12-27, Accessory Structures. The keeping of roosters, goats, sheep, pigs, hroses, cows or similar animals is specifically prohibited;
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-12
(8) Large family day care homes when located in a single-family residence and when in accordance with the requirements established in Chapter 12-29A of the Zoning Ordinance;
(9) Cottage food operations when in accordance with the requirements established in Chapter 12-29B of the Zoning Ordinance;
(10) Transitional Housing (as defined in Government Code Section 65582); (11) Supportive Housing (as defined in Government Code Section 65582 and implemented in Health and Safety Code Section 50675.14); (12) Employee housing providing accommodation for six or fewer employees (as defined in Health and Safety Code Section 17021.5); (13) Child Day Care Center.
c. Conditional Uses. The following uses and those similar uses which the planning commission finds to fall within the intent and purpose of this zone, that will not be more obnoxious or detrimental to the public welfare, are found by the commission to be compatible with adjoining land uses, and which are of a comparable nature and of the same class enumerated for this zone, shall be permitted in the R-2 district subject to obtaining a conditional use permit according to the procedures set forth in Article 2 of Chapter 35 of the Zoning Ordinance:
(1) Dwelling groups, triplexes and fourplexes, when density requirements can be met;
(2) Churches (development regulations from Section 3.1.5 of this Specific Plan shall apply);
(3) Public utility uses;
(4) Private schools;
(5) Care of nonrelated persons (seven or more persons); (6) An increase in pipeline capacity through the repare, maintenance, replacement or installation of new pipelines as defined in Section 12-
2.113.1 of the Zoning Code;
d. Accessory Buildings. Accessory buildings shall be permitted in the PD/R-2 district subject to compliance with all requirements set forth in Chapter 27 of the Zoning Ordinance.
e. Minimum Parcel Size
(1) Subject to subsection (2), each interior lot shall have a minimum are of not less than six thousand (6,000) square feet and a minimum width of not less than sixty (60) feet. Each corner lot shall have a minimum area of not less than seven thousand (7,000)
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-13
square feet and a minimum width of not less than seventy (70) feet.
Minimum lot sizes and widths for schools and churches shall be subject to the approval of the Planning Commission.
(2) The City Council, through a subdivision map, may create lots smaller than specified in subsection (1) of this section, provided the overall density of the project is consistent with the general plan. f. Density and Open Area
(1) When the parcel of land proposed for development is less than one acre in size, the maximum density shall not be less than 3,000 square feet of net land area per dwelling unit. Net area is determined by subtracting existing street, alley or other public right-of-way dedications from the original parcel. When the property is larger than one acre, the maximum density is 12 units per gross acre.
(2) A landscaped area of not less than three hundred (300) square feet, exclusive of required yards, shall be provided on the same building site for each dwelling unit.
g. Maximum Building Height. The maximum allowable building height is thirty feet.
h. Setbacks. All yard measurements are made from the lot lines. Yard measurements on lot lines abutting street rights-of-way assume a lot line based on the ultimate standard design right-of-way.
(1) Front Yard
(a) Front yards shall be no less than twenty feet; except garages with side entry may be set back fifteen (15) feet from the front property line.
(b) Setbacks shall be landscaped except for driveways to required parking areas.
(2) Side Yards
(a) On interior lots, one (1) side yard shall be a minimum of five (5) feet and the other ten (10) feet.
(b) On a corner lot, the setback shall be fifteen (15) feet from the side property line adjoining the street; the other side yard shall be five (5) feet. Front-entry garages, however, shall be set back twenty (20) feet from the property line.
(c) A zero (0) side yard (attached or detached units) may be permitted upon approval of a development plan or subdivision map when the total for side yard requirements is met on each lot or parcel.
(3) Rear Yard. Rear yard setbacks shall be as follows:
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-14
(a) For single-story structures, the setback shall be a minimum of ten (10) feet;
(b) For two-story structures, the setback shall not be less than twenty (20) feet.
(c) Subsections (a) and (b) of this section notwithstanding, for lots abutting a public alley, garages and carports taking access from the alley shall be set back twenty-five (25) feet from the opposite side of the alley or have a side-entry garage with at least a twenty-five (25) foot maneuvering space.
(4) The above setbacks may be modified by the Planning Commission on a case-by-case basis as part of a Planned Development Permit. i. Parking. For provisions on parking, see Chapter 32 of the Zoning Ordinance. j. Signs. For provisions on signs, see Chapter 34 of the Zoning Ordinance. k. Noise. Residential structures adjacent to arterial or collector streets shall comply with either one of the following:
(1) The recommendations contained in an accoustical report prepared by an acoustical expert acceptable to the community development department;
(2) The installation of solid-core doors and double-glazed windows on all openings in the elevation of the structure facing the arterial or collector streets. Roof vents racing arterial or collector streets shall be baffled in a manner acceptable to the zoning administrator.
l. Architectural and Aesthetic Standards. See Section 3.3.2, “Exterior Design Requirements”. Where provisions in Section 3.3.2 are silent or fail to fully address an architectural or asethetic standard, the latest adopted City of Santa Maria Objective Design Standards shall prevail.
3.1.43 Open Space (OS) Zone Standards
The following standards apply to development within the Open Space (OS) zone. Note that it is the intent of this plan to use the OS zone as a means of maintaining natural open space for drainage, aesthetics, and recreation.
a. Purpose. The OS district is designed and intended to provide open space for the preservation of natural resources, managed production of resources, outdoor recreation, the protection of public health and safety, and to preserve natural scenic areas for future population, and to provide areas for future planned growth of the city.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-15
b. Permitted Uses. The following uses shall be permitted in the OS district:
(1) Agricultural lands including farms, plant nurseries, orchards, and truck gardening;
(2) Rangelands:
(3) Areas required for recharge of groundwater basin, including retention basins required for flood control,
(4) Areas required for the preservation of plants and animal life, including habitat for wildlife species;
(5) Areas for Outdoor recreation, including parks, utility easements, trails, and scenic highway corridors;
(6) Areas which require special management or regulation because of hazardous conditions such as earthquake fault zones, unstable soil areas, floodplains, watersheds, areas presenting high fire risks, and areas required for the protection of groundwater recharge, and water storage areas;
(7) Land reclamation projects.
c. Conditional Uses. The following uses and those similar uses which the planning commission finds to fall within the intent and purpose of this zone, that will not be more obnoxious or detrimental to the public welfare and are found by the planning commission to be compatible with adjacent properties, arid which are of a comparable nature and of the same class enumerated in this section, shall be permitted in the 0S district subject to obtaining a conditional use permit according to the procedures set forth in Article 2 of Chapter 35 of the Zoning Ordinance:
(1) Commercial greenhouses;
(2) Commercial recreational facilities;
(3) Riding academies and stables with the boarding of horses; (4) Public utility structures;
(5) Electrical substations;
(6) Libraries and museums;
(7) An increase in pipeline capacity through the repair, maintenance, replacement, or installation of new pipelines as defined in Section 12-2.113.1 of the Zoning Ordinance.
d. Accessory Uses. Premises in the OS (open space) district may be used for accessory uses, provided such uses are established on the same lot or parcel of land, are incidental to and do not substantially alter the character of any permitted principal use
e. Parking. For provisions on Parking, see Chapter 32 of the Zoning Ordinance.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-16
f. Signs. For provisions on signs, see Chapter 34 of the Zoning Ordinance.
3.1.45 Public Facilities (PF) Zone Standards
a. Purpose. The PF district is designed and intended to provide open space for those Uses and activities which serve the public and are generally conducted by government agencies or charitable and philanthropic nonprofit organizations. In this plan, the primary purpose is to provide public school facilities. b. Permitted uses. The following uses and those which the planning commission find to be similar to and within the intent and purpose of the PF district, that are no more obnoxious or detrimental to the public welfare, and are found by the commission to be compatible with adjoining land uses, and which are of comparable nature and of the same class as the uses enumerated in this section, are permitted:
(1) Governmental buildings and facilities designed for public use and accommodation;
(2) Public libraries, museums and schools and colleges; (3) Charitable and philanthropic institutions;
(4) Water and wastewater treatment plants, substations and other public service facilities of a similar nature;
(5) Uses, buildings and structures incidental, accessory and subordinate to permitted uses;
(6) Churches
c. Lot Coverage. No development shall cover in excess of fifty percent (50%) of the total area of the property (exclusive of the public streets). d. Height. No building or structure shall exceed a height of three (3) stories or thirty-five (35) feet as measured from the finished grade on the site, unless so authorized by the zoning administrator, upon his finding that unique circumstances apply to the particular property or development proposed which justify an exception and which if allowed will nerveless be compatible with adjoining properties.
e. Setbacks.
(1) Front yard: No building or structure shall be located closer than fifteen (15) feet to the right-of-way line of any public street. (2) Required side yard is ten (110) feet.
(3) Required rear yard is ten (110) feet.
f Project Review.
(1) No permit shall be issued for the grading of land nor the construction, erection or moving of any buildings or structures, nor
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-17
the use of any land in the PF district until a development plan has been approved by the planning commission. Three (3) copies of a development plan shall be submitted to the community development department and shall include the following:
(a) A plot plan of the proposed development drawn to scale showing the boundaries of the property, topography, and a proposed grading plan; the width, location and names of surrounding streets; the location, dimensions and uses on adjacent property of all existing buildings and structures within fifty (50) feet of the boundary line oil the subject property; the location, dimension, ground floor area, and uses of all existing buildings and structures on the subject property; landscaping, parking areas, including the size and number of parking spaces and the internal circulation pattern; signs, including location, size and height; pedestrian, vehicular and service ingress and egress; location, height and material of walls and fences; and a designation of the specific uses of the property;
(b) Schematic drawings, and renderings to scale showing the architectural design of buildings and structures proposed to be constructed;
(c) Statistical information including the following:
• Acreage or square footage in the property,
• Height, ground floor area and total floor area of each building, • Number of buildings on the site,
• Building cove-rage expressed as a percentage of the total lot area,
• Parking ratio, expressed as the number of parking spaces to the square footage of building area,
• Area of land devoted to landscaping and/or open space usable for recreation purposes and its percentage of the total land area,
• The sequence of construction of various portions of
development.
• A statement as to the source of water and method of waste water disposal,
(2) Upon receipt of a development plan, together with the required supplemental data, the community development department shall transmit copies of the development plan along with the developmental recommendations to the planning commission which
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-18
shall consider the plan and the recommendations of the staff and shall approve, conditionally approve or disapprove the development plan within a period of thirty (30) days. The decision of the planning commission shall be subject to appeal to the council.
g. Parking. For provisions on parking, see Chapter 32 of tie Zoning Ordinance. h. Signs. For provisions on signs, see Chapter 34 of the Zoning Ordinance. i. Architectural and Aesthetic Standards. Churches are to be designed in a NeoTraditional/Country Church architectural style similar to the residential architecture that has been required within the North Preisker Ranch Specific Plan area. Several examples of acceptable church architecture are shown in Figure 3-13. [Ordinance 2000-16]
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-19
3.2 CIRCULATION DESIGN STANDARDS
All circulation improvements, including those to roads and sidewalks shall be in conformance with the City of Santa Maria Public Works Departments "Standard Plans and Specifications." Although this section of the Specific Plan illustrates the basic design parameters by which roads and sidewalks are to be constructed in the North Preisker Ranch planning area, refer to the City's "Standard Plan and Specifications" for a full description of design parameters.
a. Secondary Arterial Design. Secondary Arterial plans arid cross-sections are illustrated in Figure 3-4. Secondary Arterials within the planning areas would include a 104 foot right-of-way section which would accommodate a paved width of between 64 feet.
b. Residential Collector Road Design. Figure 3-5 shows a typical overhead plan and section for the extensions of Residential Collectors serving the planning area. Roadways constructed without adjacent Multipurpose trails would have a paved width of 44 feet, with 6-foot sidewalks on either side. A 10-foot wide public utility/ landscaping easement will be adjacent to each sidewalk. If Mufti-Purpose Trails are required, they shall be 8-foot wide meandering paths within a 16-20 foot wide landscaped area adjacent to the street. These areas Would replace the standard 6-foot sidewalk and adjoining 10-foot public utility/landscape easements.
c. Residential Local Street Design. Residential Local streets which in turn would connect to the collector roads and arterials, as shown in the Circulation Plan (figure 2-4). Figure 3-6 shows a typical plan and cross section for Residential Local streets that would be constructed with the planning area. Residential Local streets would be constructed with a 41 -foot right-of-way and a paved width of 40 feet The cross section shows that a typical Residential Local street would be a two-lane facility with paved shoulders and six-foot sidewalks and ten-foot wide landscaped parkways.
d Local Minor Street Design. Although not shown in the Circulation Plan (figure :441 it is anticipated that individual lots would be served by Local Minor streets.
Local Minor streets may be constructed with a 36-foot curb-to-curb width (Figure 3-7).
e. Modern Roundabout Configurations. There are two intersections identified in the Circulation Plan (Figure 2-4) which feature a Modern Roundabout in the planning area. Figure 3-11 illustrates the conceptual configuration each should have after plan implementation. [Ordinance 2000-16]
Note that these figures are not to scale, and the actual engineering of these intersections should be used to show the intent of what is to be constructed at these locations.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-20
f. Bikeway Pedestrian Path Design. Mufti-Purpose Trails are to be constructed as per existing City standards. They shall be 8 feet wide and meander within a 16- to 20-foot-wide landscaped area adjacent to designated public streets. g. Parkway Detail. See Parkway detail (Figure 3-8)
h. Median Detail. See Median detail (Figure 3-9).
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-21
Figure 3-4
3.0 LAND DEVELOPMENT REGULATIONS
3-21
Figure 3-4
3.0 LAND DEVELOPMENT REGULATIONS
3-21
Figure 3-4
3.0 LAND DEVELOPMENT REGULATIONS
UP TO 104' Right of Way
¢ I 17' I
10'-20 l7 2 I'-20
E
UP TO vA Pavement
PLAN
• - er
I
¢' 1
µ' 14 12' 12.' 1'-20' o 2' � � 1 6'-20'
L
UP TO Jo4'
SECTION
SECONDARY ARTERIAL
Figure 3-4
3-21
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-22
Figure 3-5
3.0 LAND DEVELOPMENT REGULATIONS
3-22
Figure 3-5
3.0 LAND DEVELOPMENT REGULATIONS
3-22
Figure 3-5
3.0 LAND DEVELOPMENT REGULATIONS
€
76' Right of Way
56'
10' 6' 10 12 12 10 10'
- I
I 8 � I � I I I I I I 00
I
03 u I
I �
44 Pavement - I �
I
a I 6.
I � I
I � I
I 1-• I
I � I
I - I
I 5 I
I
o I
�
� I
R
PLAN
1. 10' 6' 10 12 � 12 1. 10 6' L 10' L d d � �
56 I
76 SECTION
RESIDENTIAL COLLECTOR ROAD
Figure 3-5
3-22
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-23
Figure 3-6
3.0 LAND DEVELOPMENT REGULATIONS
3-23
Figure 3-6
3.0 LAND DEVELOPMENT REGULATIONS
3-23
Figure 3-6
3.0 LAND DEVELOPMENT REGULATIONS
, t �
PLAN
I 2
8 12
a
40 8 12
12 8
! B
Pavement
-
12 8 p
2J" � � � �
41 t
SECTION
RESIDENTIAL LOCAL STREET
3-23
Figure 3-6
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-24
Figure 3-7
3.0 LAND DEVELOPMENT REGULATIONS
3-24
Figure 3-7
3.0 LAND DEVELOPMENT REGULATIONS
H
21 l E
l Right ot Way �
6 - �
Q
� 6*
18' 18'
36' Pavement
SIDEWALK
PLAN \ 8' LANDSCAPED PAAIQNAY • 8' LANDSCAPED PARKWAY
t 31 � •.l. l l 36° 1
6 18 SIDEWALK
� � ' SIDEWALK
l 1-8' LANDSCAPED PARKWAY
[4.' / l 4-'
SECTION
12' WIDE EASEMENT FOR
TREES. UTILITIES & ACCESS.
ALTERNATE LOCAL MINOR STREET
Figure 3-7
3-24
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-25
Figure 3-8
3.0 LAND DEVELOPMENT REGULATIONS
3-25
Figure 3-8
��
3.0 LAND DEVELOPMENT REGULATIONS
ALTERNATE LOCAL MINOR STREET
H
.
l[ rr#»'e»n.
I ieweswe .me' /-
3-2: I
I
/u,2 I 4o$
l � A 3 �
4'
12'
� L La 1� o � #
1f
PARKWAY DETAIL
SCALE: 1/8° = 1'-0"
Figure 3-8
3-25
�
L
W
Z
□
�
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-26 Figure 3-9
3.0 LAND DEVELOPMENT REGULATIONS
3-26 Figure 3-9
ONS
,f.�
�·
� "' )-
:J. � 1
1 t
..l r-
�
w r 1 �
-- r � f:'
MEDIAN DETAIL
SCALE: 1 • • 20'
3-26 Figure 3-9
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-27
Figure 3-10
[Ordinance 2000-16]
3.0 LAND DEVELOPMENT REGULATIONS
3-27
Figure 3-10
[Ordinance 2000-16]
1•3 7 :::::, I
Z
•? I
> �
< �
0 z
<
�
-
(
I
I
i
3.0 LAND DEVELOPMENT REGULATIONS
RE6KT!R
o GaR �
C
) I
0 D.;<£S!:::£\Tt.!./
OE,TR
7 � � 3 EI - ��
� cs � � �
I � � � � �
� j � = � S 5
RAILROAD AVENUE AND HIDDEN PINES WAY
HIDDEN PINES WAY AND RYANTON AVENUE
North Preisker Ranch Specific Plan
MODERN ROUNDABOUT CONFIGURATIONS Smjlbltch&US4 I K C p � 7 D � 1 I I � 3-27
Figure 3-10
[Ordinance 2000-16]
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-28
Figure 3-11
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-29
Figure 3-12
3.0 LAND DEVELOPMENT REGULATIONS
3-29
Figure 3-12
3.0 LAND DEVELOPMENT REGULATIONS
3-29
Figure 3-12
MWT-2 WM4
CLASS IE
DIKE LANE
3.0 LAND DEVELOPMENT REGULATIONS
2'MINIMUM GEA.*EOuiE.JENT
2·
LINEAR PARKWAY
AND ACCESSWAY
3-29
EMEGENcY
VE*K ss
� Hg , fil �C•,-- • I r _ -Vs"i .
1 · -
A eccoN
ri • •
t
-I
-(
-i
-I
0 30t
Figure 3-12
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-30
3.3 COMMUNITY DESIGN GUIDELINES
The component of the Land Development Regulations establishes design guidelines which govern public and private and private improvement within the North Preisker Ranch planning area.
3.3.1 Public Improvements
a. Streets and Sidewalks.
(1) Integrate surface materials into the overall design concept for residential portions of the North Preisker Ranch area. Coordinate their selection with the choice of lighting, street furniture; signs and the buildings (2) Clearly identify points of conflict between vehicles and people, such as crosswalks and alleys with striping in accordance with the City's "Standard' Plans and Specifications"
(3) A safe, even, slip-resistant surface s hall be used for, all materials used for sidewalks and other pedestrian areas per standards set forth in [lie City’s "Standard Plans and Specifications "
(4) Sidewalks at all intersections shall have flared curb ramps with safe width and slope, per standards set forth in the City’s "Standard Plans and Specifications."
(5) Ramps shall have textured, non-slip surfaces.
b. Lighting. In the design of Lighting for the North Preisker Ranch Specific Plan, careful consideration must be given to the community architectural theme as well as the safety of the site users. An effort should be made to emphasize human scale in public areas adjacent to buildings and along walks. In all conditions, lighting should be consistent with the City of Santa Maria lighting standards.
Streetlight standards, pedestrian and building lighting play a vital role in defining a safe and secure appearance. This lighting concept has been devised to provide a hierarchy of lighting effects which will contribute to the overall cohesiveness of the community image
(1) Light standards should blend architecturally with buildings, pedestrian areas and other hardscape elements.
(2) Fixtures and standards should conform to state and local safety and illumination requirements.
(3) Design and placement of site lighting must minimize glare affecting adjacent properties, buildings: and roadways.
(4) Automatic timers on lighting should be designed to maximize personal safety during nighttime use saving energy.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-31
• Special Condition Lighting Lighting fixtures and standards within the public; rights-of-way play a crucial role in displaying a level of quality of the development along streets.
(a) Lighting should be positioned to enhance the safety of vehicular and pedestrian flows at key points along the roadway. Light should be concentrated at intersections and pedestrian
crosswalks.
(b) The maximum height of roadway lighting should be thirty (30) feet with a minimum clearance of sixteen (16) feet provided above roadways.
• Parking Area Lighting
(a) Since landscaped islands within parking areas are separated from buildings and will typically be hidden from view by landscaping and trees, a lower profile lighting standard may be used. In commercial office parking areas where visibility to buildings is crucial and landscaping may be less dense, pedestrian area theme lighting tied to architectural styles must be continued through parking area islands.
(b) The maximum height of parking area lights should be twenty (20) feet.
(c) Concrete may be used to light standard bases in parking area islands to protect lighting from damage.
• Pedestrian and Entry Area Lighting
(a) Pedestrian and entry area lighting will provide illumination in public spaces. For, all uses permitted where above ground illumination is desired, an architecturally compatible lighting fixture(s) is recommended.
(b) These standards should not exceed twenty (20) feet in height. • Architectural Lighting
(a) To highlight monument signs or architectural features such as walls, entryways, or lobbies, dramatic lighting should be used. (b) Spillover lighting from entry areas is acceptable although glare onto adjacent properties should be avoided.
(c) Wall "washing" effects must he sparingly used to accentuate architecture at key visual areas and not used as an attempt to advertise buildings to roadways.
(d) AII architectural lighting whether carefully integrated into building details or concealed flush with grade, should not be visually apparent during the daytime.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-32
• Landscape Lighting
(a) Landscape lighting can be used to highlight landscape features such as specimen trees, and pedestrian areas. As with
architectural lighting, light sources must be concealed flush with grade or otherwise concealed during the daytime.
(b) String lights with non-flashing small white bulb, can be used to highlight trees within public plazas and outdoor areas at night to create excitement and a festive ambiance.
c. Landscaping
(1) Require street trees on public right-of-ways, as per City Standards. (2) Landscape all setback, parkway, and non-work areas, except as otherwise permitted,
(3) Landscape public right-of-ways with drought-tolerant trees, shrubs, and ground cover. See Appendix B for a list of approved drought tolerant plants
(4) Install permanent automatic irrigation for all landscaped areas in accordance with Chapter 44 of Title 12, Landscape Standards. Use drip irrigation systems in shrub areas where feasible.
(5) Replace turf areas with drought tolerant ground Cover for inactive areas where 'feasible.
(6) Provide picnic tables, barbecues, trash receptacles, and public restrooms for the open space park in accordance with City standards. (7) Provide Multi-Purpose Trails within the planning area as shown in Figure 2-4. The pedestrian and bicycle access to the residential areas may be combined with the secondary emergency access when appropriate, (8) Require that all detailed landscaping plans for the pl3nning area and roadways be prepared by a qualified licensed landscape architect and reviewed by the City of Santa Maria Community Development Department, and/or other appropriate decision-making agencies. (9) Require that conceptual landscaping plans be submitted to the. City Community Development and Recreation and Parks Department: prior to the approval of any development permits.
(10) Require that landscaping of open space be installed by a licensed landscape contractor, under the direction of the landscape architect and the City of Santa Maria.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-33
3.3.2 Private Improvements
a. Exterior Design Requirements.
(1) All exterior elevations which front streets will reflect the particular architectural style of that structure which must be a traditional motif (see figure 3-3 for examples)
(2) All mechanical equipment or duct work will not be roof mounted or visible from the street view.
(3) Screen all mechanical equipment mounted on or adjacent to the wall surface of a building.
b. Landscape Design.
(1) Require installation of one street tree per dwelling unit in all residential developments as per City Standards
(2) Street trees shall be selected from among a City-approved list of trees (Appendix B).
(3) Landscape all unpaved area with trees, shrubs, and ground cover. The use of drought tolerant plant materials are required. See Appendix B for drought tolerant plant list.
(4) Prohibit turf areas in excess of fifty (50) percent of the total designated landscaping area unless said area is used for active recreation. (5) Require all front yard landscaping to be in accordance with Chapter 44 of the Uniform Landscaping Guidelines.
(6) Landscape side and rear yards to complement building and site design while providing relief and buffering of noise, heat and glare. Landscaping in these areas shall consist of the following.
(a) All unpaved areas shall be landscaped with trees, shrubs, or ground cover. (b) For each side and rear exterior elevation where trees can be provided, the quantity shall be equal to one (1) tree for each thirty (30) feet of exterior wall length. Minimum sizeof plant material shall be fifteen (15) gallon. c. Lighting.
(1) Lighting design should be traditional, simple and of durable construction per City Standard Plans and Specifications.
(2) Porch, drive way, and yard lighting should be incandescent and moderately bright. Fluorescent or mercury vapor-type lamps are too harsh for small scale, outdoor areas, and should be avoided.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-34
Figure 3-10
[Ordinance 2000-16]
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-35
3.4 INFRASTRUCTURE STANDARDS
a. Grading. All grading activities shall be in conformance with the following provisions.
(1) Prior to any development within any area governed by the Specific Plan, an overall Preliminary Grading Plan or the portion in process shall be submitted for Community Di:avelopment Department approval. The Preliminary Grading Plan for each area shall be used as a guideline for subsequent detailed grading plans for individual stages of development within that area and shall includa techniques employed to prevent emsion and sediimentation during and after the grading process, approximate time frames for grading, identification of areas which may be graded during higher probability rain months (December through March), and preliminary pad and roadway elevations.
(2) Detailed grading plans shall be prepared prior to any on-site grading for each project or group of projects.
(3) Potential ditches, terrace drains or other minor swales, determined necessary at future stages of project review, shall be lined with natural erosion control materials orconcrete.
(4) Grading work shall be balanced onsite wherever possible. (5) All cut and fill slopes shall be constructed at inclinations of no steeper than two horizontal feet to one vertical foot, unless walled or retained. (6) Grading shall not be permitted prior to approval of grading permits for the development area in question.
(7) Grading and erosion control design shall be in accordance with City of Santa Maria Code.
(8) Final grading, erosion control and drainage plans shall be reviewed and approved by the Building Division of the Community Development Department and the Public Works Department prior to final approval, (9) The final grading plan shall note that all graded slopes shall be extensively planted upon completion of grading and prior to the rainy season to stabilize slopes and minimize erosion.
(10) Site preparation shall include the recompaction of any loose soils:
(11) Landscaped areas adjacent to structures shall be graded so that drainage is away from structures.
(12) Runoff from roof drains and gutter downspouts shall be collected and conveyed to the street of catch basins.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-36
(13) Fills. placed on slopes steeper than 5:1 shall be properly benched prior to placement of fill.
(14) All drainage shall be directed away from cut/fill slopes. (15) Brow ditches and/or berm shall be constructed and maintained above all cut and fill slopes, respectively,
(16) The applicant shall post a bond with the City to ensure that dust and erosion is controlled.
(17) Temporary berm and coordinated sediment trapping basins shall be constructed to avoid erosion where possible. This shall be done on a site specific basis as individual projects are proposed. (18) Drainage which cannot be directed to roadways shall be collected in drainage swales and then, conveyed toward off-site drainage systems, These mitigations are intended as a checklist only and specific requirements shall be determined by the soils engineer at the time of development and on a project specific basis by the City With the review process. b. Drainage. Construct drainage facilities in accordance with, the engineering design standarris of both thp City of Santa Maria and the Santa Barbara County, Flood Control and Water Conservation Dibtrict. This includes:
(1) Water courses must be placed in closed conduits where the flow requaies a reinforced concrete pipe 48 inches in diameter or less:
(2) Artificial water courses Which provide for runoff generated within a tract in closed conduits regardiess of size.
(3) Storm drains and drainage inlets must be sized to accommodate a 25-year storm runoff event with an overland escape designed for a 100-year storm.
(4) Minimum size storm drain is 18 inches in diameter.
(5) The closest finish floor elevation must be at least two (2) feet above the 100-year storm level.
(6) The lot pad must be at least two (2) feet above the 100-year storm level. (7) Setbacks from floodway channels must be maintained. These are dependent on ground topography, channel lining type and other factors. (8) Prior to any grading or construction in a regulatory floodway, a flood study must be submitted and approved by the Flood Control District.
ATTACHMENT K
3.0 LAND DEVELOPMENT REGULATIONS
3-37
(9) Proposed projects shall provide sufficient site and public drainage improvements to maintain one open lane of traffic on roads in each direction during a 100-year storm event.
(10) Proposed rnojects shall provide protection to residences and habitable structures from a 100-year runoff event in accordance with the latest local flood control ordinances. This normally is done by maintaining the finish floor elevations of proposed habitable structures two (2) fleet above the base flood elevation as published by Federal Emergency Management Agency.
c. Water Regulations.
(1) All plumbing fixtures shall be of a low flow nature, including using
1.6-gallon per flush toilets.
(2) The landscaping shah be consistent with the "Uniform Landscape Guidelines” contained in Chapter 44 of the Municipal Code. Low, water demand drought resistant landscaping shall be encouraged. (3) An automatic landscape irrigation system incorporation time clocks and/or moisture sensors shall be installed.
(4) Any changes in landscape material such as the installation of additional turf area shall be reviewed and approved by the Community Development Department prior to the implementation of such charges. (5) Storm water detention basins shall be constructed as part of this project; this will help recharge tne groundwater basin and lessen the negative impact to groundwater resources.
(6) Slopes shall be graded so that runoff of surface water is minimized or directed to on-site pervious areas for recharge onto the groundwater basin.
ATTACHMENT K
Attachment L
CITY OF SANTA MARIA
TENTATIVE TRACT MAP CONDITIONS
PLANNING DIVISION 110 SOUTH PINE STREET ROOM 101 SANTA MARIA, CA 93458 805.925.0951 X 2244 PERMIT NO. TR2025-0001____________________________________
APPROVAL DATE November 17, 2026 _______________________________________ PROJECT NAME Courtyard at Hidden Pines Tentative Tract Map (Tract 6044) APPLICANT/OWNER Urban Planning Concepts/Dan Patin
ADDRESS/LOCATION 2415 North Railroad Avenue
DESCRIPTION Tentative Tract Map (TR2025-0001) for Dan Patin to subdivide a 2.8-acre (net) lot into 7 lots to create six attached single-family residences each on their own lot, and one common mixed-use lot with 8 market-rate apartments, approximately 21,000-square-feet of neighborhood-scale commercial, outdoor gathering space and amenities, 72 parking spaces, and associated facilities on a 2.8-acre site with a proposed PD/R-2 (Planned Development/Medium Density Residential) zone designation.
FINDINGS
The City Council of Santa Maria makes the following findings in accordance with Section 11-3.03(f) of the Santa Maria Municipal Code regarding the proposed Tentative Tract Map, Tract 6044:
A. The proposed map is consistent with The City of Santa Maria General Plan and North Preisker Ranch Specific Plan because the subdivision of the property into developable residential and mixed-use lots is consistent with the design, use and future development parameters and density of the associated Planned Development Permit, and meets all applicable General Plan goals, specifications, and requirements. Six of the seven residential parcels are smaller than the R-2 standards for frontage width and lot area according to Section 12-7.07(a) of the Municipal Code. The average lot width for the proposed interior and corner residential lots, is 53.7-feet and 64.6-feet respectively, and the average lot area is 5,367-square-feet and 6,460-square-feet respectively. Per Section 12-7.07(b), the City Council, through a subdivision map may create lots smaller than specified, provided the overall density of the lots is consistent with the General Plan. Per the Low Medium Density Residential Land Use Classification (LMDR), lots of this size which would provide affordable single-family housing on small lots while at the same time maintaining adequate individual private open space, design flexibility, and the character of a single-family neighborhood. Each of the six smaller newly created lots would contain one new residential unit. The proposed residential TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 2 -
density of approximately five units per acre for the tract map area is consistent with the LMDR land use density provisions of the General Plan. Further, the width of the proposed parcels is consistent with those at Hidden Pines Estates and Regency Estates to the west and southwest of the project, where the lots are the same land use/density and are also narrow.
B. The design or improvement of the proposed subdivision is consistent with applicable general and specific plans because lots of this size (5,367 to 6,460 square-feet) could be developed with one small-lot residential unit, which would be more affordable by design, while also maintaining adequate individual private open space, design flexibility, and the character of a single-family neighborhood. With the approval of the requested modifications to setback standards discussed in the Planned Development Permit (PD2025-0001), all future development on the resulting parcels will be consistent with applicable Municipal Code and North Preisker Ranch Specific Plan design measures and development standards.
C. The site is physically suitable for the proposed density of development because no physical constraints are known to exist on the project site that would preclude the density of allowable development, and the proposed public improvements provide the infrastructure needed for the proposed development density.
D. The site is physically suitable for the type of development because no physical constraints are known to exist on the project site that would preclude the type of allowable development. The project site does not contain any significant or unique features, is adjacent to existing roadways, and contains no physical constraints that would preclude the proposed mixed-use development. The proposed public improvements will provide the infrastructure needed for the proposed mixed-use development.
E. The design of the proposed subdivision or the proposed improvements will not cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. These and other potential environmental impacts resulting from development of the specific plan area were previously analyzed and adequately covered in a previously adopted Final Environmental Impact Report (SCH# 90010930). Only minor technical changes were required to address the potential environmental impacts related to the project; therefore, an Addendum has been prepared pursuant to California Environmental Quality Act State Guidelines Section 15164.
F. The design of the subdivision or type of improvements are not likely to cause a serious public health hazard because development on the resulting parcels shall implement all applicable Municipal Code design measures and development standards to ensure for the health and safety of the users of the site(s) and for the surrounding properties.
G. The design of the subdivision or type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision because any affected easements have been identified and depicted on the proposed map. New easements for access, utilities, TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 3 -
landscaping, and shared use facilities shall be established through this map. The map will identify the location and depiction of all easements, and the party responsible to maintain the easement.
H. The discharge of waste from this proposed land division into the existing community sewer system will not result in a violation of existing requirements prescribed by the Regional Water Quality Control Board because the project conditions require the installation of new sewer utility lines and wastewater facilities in conformance with Municipal Code Title 8, and the development of the new lots will be completed in accordance with the Regional Water Quality Control Board standards. The City of Santa Maria Utilities Department has reviewed the proposed map to ensure conformity with existing requirements and has included conditions of approval to ensure adequate sewer service is provided for each parcel.
CONDITIONS OF APPROVAL
The project is approved subject to the following Conditions of Approval:
Community Development Department
1. Indemnification: Pursuant to Government Code §66474.9(b), the subdivider shall defend, indemnify and hold harmless the City and/or its agents, officers and employees at his/her sole expense from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this subdivision, Tract 6044, and all actions relating thereto, including but not limited to environmental review, and action taken pursuant to §66462.5 of the Subdivision Map Act. The applicant shall reimburse the City, its agents, officers, or employees, for any court costs and attorney's fees which the City, its agents, officers or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his/her obligations under this condition.
2. Agency Requirements: The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project.
3. Mitigation Monitoring and Reporting Program: The mitigation measures in the Mitigation Monitoring and Reporting Program for the Environmental Impact Report (SCH#90010930) are hereby incorporated and attached for reference.
4. Recordation: The recordable map for this project shall be prepared and submitted to the Public Works Department for checking and shall be recorded within 36 months of the approval date. If the map has not been recorded within 36 months of the date of approval, the applicant is advised to apply a minimum of 30 days prior to the expiration date for an extension of time. Said extension of time shall be reviewed by the Planning Commission.
TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 4 -
5. Revisions: If the map is revised from the approved tentative parcel map, or if changes to conditions are sought, the procedures contained in Chapter 10 of Title 11 of the Municipal Code shall be followed.
6. Construction Hours: Construction activities shall be limited to the hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, and 8:00 a.m. to 5:00 p.m. on Saturdays. No construction activities are to occur on Sundays or holidays. A note to this effect shall appear on the recordable map.
7. CC&R’s Condition: Copies of the proposed Covenants, Conveyances and Restrictions (CC&R’s) or other maintenance agreement acceptable to the Community Development and Public Works Departments shall be submitted for review prior to recordation of the final map. The CC&R’s shall address the following items:
a. Maintenance of all required landscaping.
b. Maintenance of stormwater control measures/underground basins c. Maintenance of subdivision boundary walls
d. Maintenance of residential fences
e. Site maintenance
f. Private street maintenance
g. Maintenance of the common area plazas
h. Storage of oversized trucks, trailers, recreation vehicles, boats, etc. i. Events in the neighborhood commercial center procedures and expectations
8. Security Gates: Based on the current configuration of the project, security gates shall not be permitted for this project. A note to this effect shall appear on the final map.
Public Works Department
ENGINEERING
9. Municipal Code Requirements: The contents of the map shall conform to Santa Maria Municipal Code Section 11-3.04.
STREETS
10. Improvements. Improvements adjacent to Tract 6044 will be required. All improvements will be constructed per Santa Maria City Standards, and will be approved by the City Engineer.
11. Underground Improvements: All underground improvements required for development of parcels within Tract 6044 shall be installed prior to street paving.
12. Street Lighting: Street light layout shall conform to the City of Santa Maria Street Lighting General Plan.
TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 5 -
13. Corner Visibility: Sight distance requirements shall be maintained at the intersection of any street, alley or driveway improved for vehicular traffic per S.M.M.C. Sections 12-27.02, 12-27.03 and Public Works Department standards.
Revisions to the wall heights and locations shown on the tentative map may be required to achieve acceptable sight distance.
14. Public Improvements: The following public improvements shall be bonded for as a condition of tract map recordation for Tract 6044.
a. ADA Curb Ramp Reconstruction: The developer shall reconstruct the ADA curb ramps at the Railroad Avenue/Hidden Pines Way roundabout in accordance with current ADA requirements and City standards.
b. Utilities: Water, sewer, and storm mains as shown on Tentative Tract Map for Tract 6044. All utilities shall be installed in compliance with California Code of Regulations §64572. Water Main Separation.
c. Frontage Repair: The developer shall repair any cracked, broken, or uplifted curb, gutter, sidewalk, or alley within the project frontage. City Public Works Inspection staff will determine the extent of the frontage repair in the field prior to construction. An encroachment permit will be required prior to issuance of a building permit for these repairs.
d. Frontage Improvements: The existing sidewalk along the project frontage on Railroad Avenue shall be removed and replaced with a new sidewalk having a minimum clear width of five feet.
i. Sidewalk ADA Compliance: The developer shall remove and replace any sidewalk within the project frontage that does not meet ADA cross-slope requirements. Curb ramps at project driveway on Main Street shall comply with Caltrans Standard Detail A88A.
ii. Landscaping: All landscaping required by Recreation and Parks Department adjacent to Railroad Avenue and Hidden Pines Way. iii. Traffic Control Improvements: The developer shall install red curb adjacent to the project driveways on Railroad Avenue and Hidden Pines Way, consistent with the approved traffic study. The approximate limits shall be shown on the tentative tract map, and the final limits shall be shown on the Public Improvement Plans and approved by the City Engineer based on sight-distance requirements.
WATER
15. Water Service: The subdivider shall install water service to each lot of the tentative map at a size appropriate for proposed use.
TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 6 -
SEWER
16. Sewer Laterals: The subdivider shall install sewer laterals to each buildable lot of the tentative map at a size appropriate for proposed use. The minimum size shall be four inches.
17. Manhole Grades: For maintenance purposes, straight grades between manholes shall be provided unless otherwise approved by the City Engineer. Curved lines that follow the centerline of the road will be allowed if it would take an excessive number of manholes to achieve straight alignment.
STORM DRAINAGE
18. Flood Hazard Areas: Flood hazard areas, based on one-hundred-year storm frequency, shall be delineated (on tentative map) based on approved flood control district methodology and, if applicable, included in an inundation easement and offered for dedication to the district. Buildable sites, as designated in the soils report (see Section 11-3.08), shall be located outside of flood hazard areas.
Drainage requirements of the Santa Barbara County Flood Control and Water Conservation District Standards also apply.
19. Regional Basin Storm Drainage: On-site retardation is not required for this site because it is served by a regional retardation basin constructed with North Preisker Ranch Tract 5764, or additional storm drainage is required.
PUBLIC UTILITIES
20. Underground Utilities:
a. All new public utilities shall be underground to comply with the Municipal Code, Section 12-28.06.
b. All existing on-site public utilities shall be placed underground as a condition of Tract 6044 [S.M.M.C. Sections 11-8.04(g) and 12-28.06].
21. Streetlights: Streetlights shall be operational prior to occupancy of any parcel within Tract 6044.
22. Transformer Locations: At time of Public Improvement Plan review, plans shall be submitted to Pacific Gas and Electric (PG&E), Verizon, Cable TV and The Gas Company for review. Comments from the utilities regarding transformer locations, etc., shall be forwarded to Public Works Department for review and approval.
EASEMENTS
23. Right-of-Way Dedication: Dedicate additional public street right-of-way along the Railroad Avenue frontage on the Final Map. The existing and proposed right-of-way lines and dedication width shall be clearly shown on the Tentative Map and Final Map. The final dedication width and limits shall be approved by the City TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 7 -
Engineer prior to Final Map approval.
24. Public Utility Easements: Dedicate public sewer and water easements over all public sewer and water facilities located within the project site. Easement widths and locations shall be as approved by the City Engineer and Utilities Department.
25. Drainage Easements: Dedicate a blanket drainage easement over all lots within the project site for the construction, operation, maintenance, repair, replacement, and access to the project’s shared drainage facilities.
26. Easement Abandonment: All existing easements to be abandoned by separate document will require the applicant to provide legal descriptions, sketches (8 ½“ x 11” City Standard format) closure calculations, and payment of current Public Works Department Fees for processing through the City. All paperwork shall be in an approved form and processed through Planning Commission and City Council prior to issuance of building permits. The abandonment shall be recorded prior to occupancy.
a. All easements to be abandoned by the map [Government code Section 66434(g) or 66445(j)] shall be clearly identified as such with City-approved notation on the tentative map, final map and/or parcel map.
SOILS
27. Soils Report Required: A preliminary soils report, prepared by a civil engineer registered in this state, and based upon adequate test borings, shall be required and submitted to Public Works Department prior to filing of the final map to comply with Government Code 66490 (Subdivision Map Act).
28. Soil Borings: Soil borings in the area of the retardation basin will be required prior to development of the basin. A minimum of two borings shall be analyzed to a depth of 15 feet +/- beyond the proposed final basin floor elevation. Additional borings will be required if analysis is inconclusive with respect to permeability.
FEES
NOTE: The fees given at this time are an estimate calculated using rates currently in effect. The actual amount due shall be calculated using fee rates in effect at the time of payment.
29. Map Checking Fee: $4,814.80 > 10 lots or $2,674.90 < 10 lots (Fiscal Year 2008- 09 fee rate). The rate changes each July in accordance with City Council Resolution 2005-101). This fee will be collected prior to approval of the plans.
30. Public Improvement Plan Check Fee: Based on approved estimated cost of public improvements or on a proposal submitted by a consultant assigned to review the project plans. The fee shall be collected prior to review of the plans.
TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 8 -
31. Public Improvement Inspect Fee: Based on approved estimated cost of public improvements. The fee shall be collected prior to issuance of a public encroachment permit or approval by the City Council of the project final map, whichever comes first.
32. Traffic Mitigation Fee: The fees shall be based on the codes and rates in effect at the time of building permit issuance.
33. Water Mitigation Fee: The fee shall be based on the codes and rates in effect at the time of building permit issuance.
34. Wastewater Mitigation Fee: The fee shall be based on the codes and rates in effect at the time of building permit issuance.
35. State Water Reimbursement Fee: The fee shall be based on the codes and rates in effect at the time of building permit issuance.
36. Drainage Fee: The fee shall be issued if the project site falls in the North Blosser Road area, the Battles Road area, or in the Orcutt area. The fee shall be based on the following fee schedule.
Blosser Drainage: $123.97 per acre (residential)
$247.89 per acre (commercial)
Battles Road Drainage: $ 54.03 per acre (residential)
$108.38 per acre (commercial)
Orcutt Drainage: $100.00 per lot (residential)
$500.00 per acre (commercial)
BONDS/SURETY
37. Faithful Performance: One hundred percent of the approved cost of all public improvements.
38. Labor & Materials: Fifty percent of the approved cost estimate.
39. One-Year Guarantee: Ten percent of the approved cost estimate.
40. Monumentation: Amount set by the developer’s engineer and approved by the Public Works Department or the monuments are to be set and accepted by the City prior to recordation of the final map.
41. Subdivision Tax Bond: A bond for property taxes is required by the Santa Barbara County Treasurer-Tax Collector for property being subdivided in the county. This bond must be in place before the County will allow the recordation of the final map.
In order to not delay the recordation of the final map, it is suggested that the applicant apply for and process a “Subdivision Tax Bond Request” from the Santa Barbara County Treasurer-Tax Collector at the same time the map is submitted to the City of Santa Maria for plan check. The Santa Barbara County Treasurer-Tax TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 9 -
Collector may be contacted at: 105 East Anapamu Street, Santa Barbara, CA (805) 568-2933.
COMMENTS:
42. Title Report: An up-to-date preliminary title report will be required prior to the filing of the final map.
43. Registered Civil Engineer: Public improvement plans prepared by a registered civil engineer and approved by the Public Works Department will be required.
Improvement plans shall include surface improvements plan and profile, underground improvements plan and profile, and signing and striping plans for all arterial streets.
44. Public Improvement Plans:
a. Should at a later date, construction of public improvements be proposed to be phased, additional review and conditioning will be required. b. The Public Improvement Plan submittal shall include landscaping and irrigation plans for any area of Public R.O.W. where landscaping is required (such as medians) and/or landscaping is to be maintained by a City landscape maintenance district. The Engineer shall submit four prints of the landscaping and irrigation plans to the Public Works Department for checking purposes (one set for Community Development and two sets for Recreation and Parks). The landscape plans, when approved, shall be submitted to Public Works Department as reproducible Mylar prints.
c. The developer shall be responsible during construction for cleaning city streets, curbs, gutters and sidewalks of dirt tracked form the subject site. The flushing of dirt and debris to storm drain or sanitary sewer facilities shall not be permitted. The cleaning shall be done after each day’s work or as directed by the Director of Public Works or the Community Development Director. d. All required improvements shall be designed and constructed in accordance with the City of Santa Maria Standard Specifications and Drawings.
45. Tentative Map. Except as modified by other conditions of approval of this project, the following documents, submitted in connection with the application for this project and retained in Engineering Division File GPZ2025-0001, are hereby incorporated by reference as conditions of this project:
Tentative Map received September 29, 2025.
Fire Department
46. Fire Hydrants: Fire hydrants shall be installed per City of Santa Maria Public Works Standards.
TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 10 -
a. Fire hydrant spacing and distribution shall comply with CFC Section 507 and CFC Appendix C. Fire hydrants shall be installed and operational prior to vertical combustible construction.
b. Hydrants shall be equipped with one (1) four and a half inch (4 ½”) outlet and two (2) 2 and half inch (2 ½”) outlets.
c. The SMFD, or a designated representative, shall inspect and approve all fire hydrant installations for operational readiness prior to combustible construction (CFC Section 501.4).
47. Fire Hydrant Protection: On-site fire hydrants shall be painted red and protected from impact in accordance with City Of Santa Maria Public Works Standards and SMFD Development Guidelines (CFC Section 507.5.6 & SMMC).
48. Water Mains: Water Mains shall be installed per City of Santa Maria Public Works and NFPA standards. The minimum main size shall be 8 inches, or as determined by hydraulic calculations CFC Section 507 & SMMC).
49. Hydrant Markers: Reflective blue dot fire hydrant location markers shall be installed (SMMC).
Recreation and Parks Department
50. Tree Species: Five street trees will be required along Railroad Avenue, and six street trees will be required along the frontage of Hidden Pines Way. A minimum of one street tree shall be planted in front of each residence. The parkway along railroad shall be extended to ten feet in width. All street trees shall be placed a minimum of five feet from all impervious structures. City street trees are to be selected from the medium to large City approved street tree list and complement the surrounding streetscape.
51. Tree Specifications: The street trees shall be 24-inch box in size and have a minimum caliper of 1.5 inches. The trees shall be planted six feet behind the sidewalk by a licensed landscape contractor in accordance with the plans and specifications of the Recreation and Parks Department. An irrigation system shall be provided for the trees.
52. Tree Bonding: Street tree bonding shall be for eleven tree plantings at $275 each totaling $3,025.00. Tree bonds are to cover a one-year establishment starting at issuance of the Occupancy Permit. Street tree requirements and bond amount are a maximum subject to change during building permit review. The tree bond is due at time of building permit issuance as a cash or surety bond delivered to Recreation and Parks at 615 S. McClelland St.
53. Tree Planting: Any nursery stock tree planted without inspection and approval by the Recreation and Parks Department shall be deemed defective and be removed by the person(s) responsible for the planting at their own expense. All plant TR2025-0001 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES TENTATIVE TRACT MAP CONDITIONS - 11 -
material shall not be root bound or contain girdling roots. Street tree location(s) shall be approved onsite by the Special Districts Supervisor prior to installation.
54. Landscape Plans: The street tree easement shall be clearly identified on the planting and irrigation plans. Only street trees shall be planted in the easement area. All other on-site private tree planting shall be planted behind the easement area. The following shall be noted on the landscape plan: “the final locations of street trees shall be determined on-site by the Special Districts Supervisor.
Twenty-four-hour notice is required for inspection prior to planting, (805) 925-0951 ext. 2346. Installation shall be in accordance with Recreation and Parks Department specifications.”
55. Park Impact: Residents of the Courtyard at Hidden Pines are prohibited from parking their cars in the parking lot at North Preisker Ranch park overnight or for extended periods during the day. Violators may face penalties, including fines and towing of vehicles.
56. Development Fees: Per the Municipal Code, several Recreation and Parks Development Fees may apply to this project.
a. Subdivision in Lieu $2,764.00
b. Residential Development Tax $185.00
c. Single Family Growth Mitigation $2.14/square foot
d. Multi-family/Senior Growth Mitigation $3.27/square foot e. Commercial Growth Mitigation $0.01/square foot
Note: fees are reviewed annually and are subject to change.
57. Landscape district advisory: This project is included in the Northwest landscape maintenance district.
NOTES:
In accordance with Section 11-13.02 of the Municipal Code, this permit is not valid until the 15th calendar day following the issuance of the permit, providing no appeal is filed; or if an appeal is filed, this permit is not valid until the effective date of the final action on the appeal.
In accordance with Section 11-3.06 of the Municipal Code, this permit shall expire thirty-six (36) months from the date the official tentative map is approved or conditionally approved. However, the approval body may consider extensions of time based on the requirements of the Subdivision Map Act. Failure to file a final or parcel map with the County Recorder within these time limits shall make the official tentative map null and void and will require that a new tentative map with a new tract number be processed. A written request justifying the need and the appropriate filing fee filed with the Community Development Department shall be submitted at least 30 calendar days prior to the expiration date.
Failure to comply with any of the conditions stated above may be cause for enforcement according to Title 11 of the Santa Maria Municipal Code, in addition to any other penalties provided by law.
All conditions of approval are to be completed by the subdivider within 12 months from the recordation of the final or parcel map unless otherwise stated, and are to be maintained in perpetuity.
EVENT ACCESS FOOD TRUCK
FOOD TRUCK TRASH TRASH
TRELLIS
TRASH TRASH TRASH TRASH
HIDDEN PINES WAY
RAILROAD AVE
CMU WALL PLASTER FINISH BUILDING 1 5,120 SQFT
COVERED
PATIO
PICKLE BALL COURTS
AREA - 11,520 SQFT CARPORTS COVERED PATIO BUILDING 5 BLDG AREA - 4,269 SQFT BUILDING 6 4,465 SQFT BUILDING 2 5,120 SQFT BUILDING 3 5,120 SQFT BUILDING 4 6,992 SQFT TENTATIVE TRACT MAP FOR TRACT 6044 HIDDEN PINES [] [] [] E E E ATTACHMENT M
EVENT ACCESS FOOD TRUCK
FOOD TRUCK TRASH TRASH
TRELLIS
TRASH TRASH TRASH TRASH
HIDDEN PINES WAY
RAILROAD AVE
CMU WALL PLASTER FINISH BUILDING 1 5,120 SQFT
COVERED
PATIO
PICKLE BALL COURTS
AREA - 11,520 SQFT CARPORTS COVERED PATIO BUILDING 5 BLDG AREA - 4,269 SQFT BUILDING 6 4,465 SQFT BUILDING 2 5,120 SQFT BUILDING 3 5,120 SQFT BUILDING 4 6,992 SQFT PRELIMINARY GRADING PLAN for TRACT 6044 HIDDEN PINES [] [] [] E E E
Attachment N
CITY OF SANTA MARIA
PLANNED DEVELOPMENT PERMIT AND
CONDITIONAL USE PERMIT
PLANNING DIVISION 110 SOUTH PINE STREET ROOM 101 SANTA MARIA, CA 93458 805.925.0951 X 2244 PERMIT NO. PD2025-0001 and U2025-0002_____________________
APPROVAL DATE November 17, 2026 _________________________________________ PROJECT NAME Courtyard at Hidden Pines
APPLICANT/OWNER Urban Planning Concepts, Inc./Dan Patin ADDRESS/LOCATION 2415 North Railroad Avenue
DESCRIPTION Planned Development Permit (PD2025-0001) and Conditional Use Permit (U2025-0002) for Dan Patin to establish a mixed-use subdivision to create seven lots consisting of six attached single-family dwellings each on their own lot, and a common lot with eight market-rate apartments, 21,041-square-feet of neighborhood-scale commercial, outdoor gathering space and amenities, 72 parking spaces, and associated improvements on a 2.8-acre site in a proposed PD/R-2 (Planned Development/Medium Density Residential) zone of the North Preisker Ranch Specific Plan.
FINDINGS
The City Council of Santa Maria hereby approves the following project in accordance with the application submitted and hereby makes the required findings in accordance with Section 12-35.105 and 12-35.203 of the Municipal Code, including the following:
A. That the project meets the vision, intent, and requirements of the North Preisker Ranch Specific Plan and the General Plan because the mixed-use development is proposed with for-sale residential attached single family and walk up multi-family housing units and neighborhood-scale commercial which is consistent with Goal LU-5: Housing stock, which aims to ensure an adequate supply of high-quality local housing stock is available to residents of all ages and abilities. The project would implement Policy LU-5.1: Housing variety. Continue to support a variety of housing types, unit sizes, and building densities in Santa Maria to support residents at differing life stages and socio-economic statuses. The project would meet Policy LU-5.2: Siting of infill development. Promote new infill housing in areas that are underutilized and in close proximity to parks, recreation, public amenities, and local goods and services. The commercial component would bring local goods and PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 2 -
services to an area that does not currently have such goods and services in close proximity. The development would contribute to attainment of Goal LU-1, which calls for a balanced mix of land uses that meets the present and future housing, employment, and recreation needs of the community by incorporating both neighborhood scale commercial and recreational uses into the project for the surrounding neighborhood. Except for the requested modifications to setbacks and development standards discussed below, the project is consistent with the North Preisker Ranch Specific Plan and the City of Santa Maria Municipal Code.
B. That the site for the proposed use is adequate in size and topography to accommodate the use, and all yards, spaces, walls and fences, parking, loading and landscaping are adequate to properly adapt such use with the land and uses in the vicinity. With approval of the requested modifications in this permit and accompanying Tentative Tract Map, the project will be consistent with applicable Municipal Code design measures and development standards for the PD/R-2 zone, including but not limited to density, landscaping, building height and vehicular access. The site is adequately sized to accommodate the proposed residential use, and the construction of the six-unit small lot single-family residential development and mixed-use development of an eight-unit two-story walk-up residential building with neighborhood scale commercial and recreation buildings would adapt with the land and uses in the vicinity which includes a similar land use pattern of lower and medium density residential development.
C. That the site for the proposed use relates to streets and highways adequate in width and pavement type to carry the quantity and kind of traffic generated by the proposed use. The design of the new private driveways within the project site has been reviewed and approved by the City’s Public Works Engineering Division and the Fire Department for access and safety. Railroad Avenue and Hidden Pines Drive, as well as the area intersections, are all adequately designed in width and pavement type to serve the project.
D. That the proposed use will have no adverse effect upon abutting property as the construction of the mixed-use development and establishment of the residential and neighborhood commercial mixed-uses would be self-sustained by providing on-site parking, including two-car garages for the single-family residences, one-space-per-unit for the multi-family residential units, two spaces per court for the pickleball center, sufficient parking for the neighborhood-serving retail uses, and additional parking for the courtyard open-air temporary seasonal event uses. The latter open-air use would be subject to separate Special Temporary Activity Permitting requirements and conditions to ensure these uses are also self-sustained on site.
E. That the establishment, maintenance and/or conducting of the use for which the planned development review is sought will not, under the circumstances of the particular case, be detrimental to the health, safety, morals, or welfare of persons residing or working in the neighborhood of such use and will not, under the circumstances of the particular case, be detrimental to the public welfare, injurious to property or improvements in the neighborhood; nor shall the use be inconsistent PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 3 -
with the character of the neighborhood or contrary to its orderly development. With the approval of the requested modifications, the project will be consistent with applicable Municipal Code design measures and development standards for the PD/R-2 zone, including but not limited to parking, landscaping, setbacks, building height and vehicular access. The project would provide adequate space for setbacks, parking, and landscaping to ensure that no nuisances would be created by the establishment of the project.
The mitigation measures from the 1992 Final Environmental Impact Report (EIR; State Clearinghouse [SCH] #90010930) for the City of Santa Maria Sphere of Influence Boundary Amendment and Concurrent Annexation, conditions of approval and development standards required for this project address and alleviate any potential adverse impacts that could result from the proposed use. Therefore, the project would be compatible with the adjoining land uses and would not be more obnoxious or detrimental to the health of the public than any of the uses established at the project area, or any of the uses listed in the PD/R-2 section of the Municipal Code or North Preisker Ranch Specific Plan.
F. That the conditions stated in the decision are necessary to protect the public health, safety and general welfare.
G. The proposed modification(s) are otherwise consistent with the General Plan, Municipal Code and applicable Specific Plans. The requested modifications to the front and side yard setback standards for Lots 1 through 6, zero-foot setbacks for the commercial buildings along the street frontage, establishment of a parking ratio of two parking spaces per indoor pickleball court, and a parking reduction of one space for the open air courtyard event space, are otherwise consistent with applicable Municipal Code and North Preisker Ranch Specific Plan design measures and development standards for the PD/R-2 zone. The Mixed-Use Ordinance seeks projects such as this that are compact in that it contains the highest and best use for the land it occupies, it is connected by safe streets, sidewalks and multi-purpose trails, and is walkable/transit accessible so it is easily accessible without the benefit of an automobile. The commercial buildings are set back from the street by an average of 18 feet, which is more than the ten-foot setback required for Community Commercial uses elsewhere in the city. Further, mixed-use development is encouraged by the City’s Housing Element Policy 1.3, and Program 1.C allows decisionmakers to grant reduced standards for parking, and setbacks.
H. The project includes superior design elements that mitigate or compensate for any potential impact of the proposed modification(s) on the surrounding area. The requested modification to the required yard setbacks and parking will allow the project to provide a compact, affordable for-sale housing type, and a commercial component both of which are encouraged by the general plan and the Mixed-Use ordinance of the Municipal Code for mixed-use development.
The project includes superior design elements such as ample amenities and open space for residents in the subdivision through creation of a courtyard area and PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 4 -
gazebo, neighborhood scale commercial goods and services for necessities, and recreational opportunities at the proposed recreation center. Each single-family lot would have 350-square-feet of private open space areas, consistent with the requirements of the R-2 development standards. The mixed-use component provides sufficient safe and accessible plazas and greenways for active and passive enjoyment, provides ample trees, bicycle parking and electric vehicle charging, and encourages neighbors to reduce traffic by providing safe and comfortable access for bicycles and pedestrians.
I. The proposed modification(s) are essential to the design of the project. The requested modifications to the side yard setback standards for Lots 1 through 6, zero-foot street frontage setbacks for the commercial buildings, establishment of a parking ratio of two parking spaces per indoor pickleball court, and parking reduction of one space for the open air courtyard event space are essential to allow the project to comply with the North Preisker Ranch Specific Plan development standards and allow for the proposed density of development at five dwelling units per acre while providing space to create a neighborhood commercial mixed-use component. The project provides the city with needed housing variety by providing attached single-family homes and walk-up multi-family residential units at the density allowed by the LMDR land use designation. Incorporation of the commercial uses on the project site would provide the surrounding residences with day-to-day essentials, which is consistent with the goals of the General Plan to create complete communities with a balanced mix of land uses that meet the present and future housing, employment, and recreation needs of the community.
J. The proposed modifications have been minimized to the maximum extent possible consistent with Subsections (a) through (c) of Section 12-35.203 of the Municipal Code. The requested setback reduction is required in order to provide an attached single-family housing type as well as a mixed-use commercial component. The proposed parking ratio for the pickleball courts is required as none of the parking standards in the Municipal Code provide an equivalent to the proposed indoor sports courts, and the open-air courtyard event space would be utilized on an occasional, seasonal basis. Any event in the courtyard would be required to obtain a Special Temporary Activity Permit, which would require its own findings for approval, and incorporate conditions of approval that would manage and control event operations. The proposed project would comply with all other setback and parking requirements, as well as Specific Plan development standards.
K. The Project was adequately covered in a previously adopted Environmental Impact Report (SCH# 90010930) and only minor technical changes were required; therefore, an Addendum has been prepared pursuant to California Environmental Quality Act State Guidelines Section 15164.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 5 -
CONDITIONS OF APPROVAL
The project is approved subject to the following Conditions of Approval:
Community Development Department
1. Project Description: The permittee shall comply with the project description, plan set entitled Courtyard at Hidden Pines consisting of 25 pages dated April 29, 2025, and Conditions of Approval of this permit.
Commercial uses for the project are to be limited to those permitted in the Community Commercial (CC) zone district unless otherwise allowed through this permit or a separate conditional use permit. The recreation building is proposed for pickleball recreation use only. Accessory use and activities must be incidental to, and do not substantially alter the character of, any permitted principal use.
Any changes from the project description, Plan Set, or conditions may require a permit amendment. Contact the Planning Division prior to changing anything described on the Plan Set or in the project description.
2. Color and Materials: A sample of all paint colors and materials to be used on the project site shall be submitted to the Planning Division for review for consistency with City Council approval prior to issuance of building permits. Paint colors shall be provided in the form of paint chips.
3. Architectural Elements: All architectural elements such as parapet walls, tower features, and architectural features shall include architectural details on all sides to provide 360-degree architecture and eliminate the appearance of a false façade.
4. Parking Area: 79 parking spaces are required, and 72 spaces are provided. The off-street parking area and access shall be paved and double striped in accordance with City parking standards. The parking area shall be maintained and regularly resealed and restriped. Please note that a building permit is required for restriping. The striping shall be visible at all times, and the parking area shall be void of potholes and depressions.
5. Events: Any event proposed on the project site requires a separate Special Temporary Activity Permit in accordance with Chapter 12-35, Article 6 of the Santa Maria Municipal Code.
6. Parking Management Plan: The operator of any community events, farmers markets, sports tournaments or similar events in the open-air courtyard or in the recreation building, shall apply for a Temporary Special Activity Permit with the Planning Division. Application materials shall include a parking and event traffic management plan to minimize the potential overflow of vehicles from the project site into the surrounding neighborhood.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 6 -
7. Bike Racks/Storage: Bike racks and/or storage shall be installed. The location, design and number shall be approved by the Planning Division during the building permit review process and in conformance with the standards of City’s Active Transportation Plan.
8. Trash Enclosure: Each trash receptacle shall be stored in an enclosure. The final development plan submitted for the building permit shall specify size and location of all trash collection areas and the enclosure shall be constructed in accordance with the approved plan. The location and design shall be approved by the Community Development Department and the Public Works Department. The trash enclosure shall meet City Standards as well as be designed in keeping with the architecture and style of the project.
Trash areas that are located adjacent to parking spaces shall be set back a minimum of ten feet to provide sight distance for automobiles backing out of the parking space.
9. Ongoing Site Maintenance: The entire site shall be permanently maintained free of accumulated dirt and litter and in an otherwise neat and attractive manner and adhere to the requirements of the Santa Maria Municipal Code. Any graffiti on the property shall be promptly painted out. All landscaping areas on the property shall be permanently maintained with healthy, growing plant material, free from weeds.
Dead or dying plant material shall be replaced within one month of plant deterioration.
Failure to comply with this condition is a public nuisance and is subject to the adopted Citation Ordinance of the City of Santa Maria.
10. CC&Rs: CC&Rs shall be reviewed and approved by the Planning Division prior to first occupancy, if not already recorded with the Final Map for Tract 6044, and shall contain the following provisions:
A. Maintenance of all required landscaping.
B. Maintenance of stormwater control measures/underground basins C. Maintenance of subdivision boundary walls
D. Maintenance of residential fences
E. Site maintenance
F. Private street maintenance
G. Maintenance of the common area plazas
H. Storage of oversized trucks, trailers, recreation vehicles, boats, etc.
I. Events in the neighborhood commercial center procedures and expectations
11. Landscape Plan: A Landscape Plan, which includes the size and species of plants, a layout of the irrigation system incorporating time clocks and/or moisture sensors, and a maintenance and watering schedule, shall be submitted to the Community Development Department for plan checking and approval. The specific planting design of the landscape area and species of trees and plants shall be subject to approval of the Planning Division during the plan check review process. The PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 7 -
landscape plan shall be prepared in accordance with Chapter 12-44 of the Municipal Code, Landscape Standards. Backflow prevention devices shall be screened with plant material and located to maximize aesthetics.
12. Landscape and Tree Maintenance: The applicant shall develop landscape and tree maintenance standards that shall be provided to any landscape contractor hired to work on the site. The standards shall be reviewed and approved by the Planning Division prior to first occupancy. The program shall require:
A. All on-site trees be properly maintained to retain a natural shape and size for the long-term health of the tree consistent with the natural growth pattern of its particular species and current ANSI A300 standards; B. Any tree topped, severely pruned or severely thinned out, subject to the determination of the Planning Division, requires a large-size replacement.
C. Ground cover and shrubbery shall be regularly maintained and pruned in a manner that encourages healthy growth and flower production. Shrubs shall not be severely sheered or formed into unnatural shapes.
13. Tree Planting: The project shall provide the trees depicted on the landscape plan.
The trees species selected shall be subject to Planning Staff review according to City Council approval. Trees shall be a minimum of 15-gallon size.
14. Landscape Irrigation Water Meter: A separate appropriately-sized irrigation meter is required for new non-residential projects with irrigated landscape areas totaling 1,000 square feet or greater, and for new residential projects with irrigated landscape areas totaling 5,000 square feet or greater. If a sub-meter is proposed for irrigation, it shall be a privately held and maintained meter, provided by the applicant, installed after the main water meter.
15. Light Standards: A photometric plan is required at the building permit stage, subject to Planning Division approval and shall comply with the following:
A. Outdoor lighting. Outdoor lighting shall be shielded in a manner that prevents a direct line between its luminary and any residentially zoned, planned, or developed parcel. Within 50 feet of a residential zoning district or within 50 feet of the lot line of a lot containing a residential use, lighting shall be installed no higher than 20 feet above the ground directly below the light fixture.
B. Outdoor lighting shall not exceed the following levels:
i. 0.50 foot-candles at the property line if the subject property abuts a residential zoning district or a lot containing a residential use. ii. 2.00 foot-candles at the property line if the subject property abuts a non-residential zoning district or lot containing only non-residential uses.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 8 -
16. Utilities: All electrical, telephone, television and communication utility distribution and services wires shall be placed underground in accordance with Santa Maria Municipal Code Section 12-28.06.
The proposed locations of all transformer boxes and utility equipment shall be approved by the Planning Division prior to installation. All transformer boxes and utility equipment shall be underground wherever feasible. If undergrounding is not possible, the equipment should be painted to match the surroundings, placed in inconspicuous areas out of public view, and screened with landscape plantings.
17. Mechanical Equipment: Mechanical equipment located on the roof of a building shall be completely screened. The height of the screening shall be as high, or higher, than the top of the mechanical equipment. The screening may be provided by an architecturally designed screen wall of solid material surrounding the equipment, or by the building wall parapet.
18. Shopping Carts: Any tenant requiring shopping carts will need to provide a cart collection process approved by the Planning Division. This may require the installation of architectural designed cart enclosures on the site in keeping with the design of the project. The design and location of the cart enclosures shall be reviewed and approved by the Planning Division. A cart guard method for controlling cart migration off-site shall also be incorporated.
19. Outdoor Display: Outdoor display and storage shall comply with Section 12-33.211 of the Municipal Code.
20. Serving of Alcoholic Beverages (on-sale): Alcoholic beverages shall only be served in conjunction with the serving of food and requires the submittal of a separate Conditional Use Permit to be reviewed and approved by the Zoning Administrator.
21. Business License: A City business license is required.
22. Hours of Operation: The hours of operation for any mixed-use project with a residential component shall not begin before 7:00 a.m. or continue after 11:00 p.m.
This standard shall include other activities directly related to the operation of the commercial component, including but not limited to pick-up and/or deliveries.
23. Performance Standards: The requirements of the City's performance standards with respect to odor, noise, smoke, vibration and discharge of liquid and solid waste shall be maintained.
A. Odor. The odors released from any operation or activity shall not exceed detectable concentration beyond lot lines, measured at any location on the lot lines. Commercial or industrial uses with attached residential units shall provide state-of-the-art ventilation systems to prevent odors from penetrating residential units.
B. Vibration. No use, activity, or process shall produce vibrations that are perceptible without instruments at the property line for more than three minutes in any one PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 9 -
hour of the day between the hours of 7:00 a.m. and 10:00 p.m. No use, activity or process shall produce vibrations for more than 30 seconds in any one-hour between the hours of 10:00 p.m. and 7:00 a.m.
C. Noise. All mixed-use developments shall comply with the City of Santa Maria adopted standards for noise. Where a mix of uses is provided, the most strict noise standards for the provided use shall apply.
i. Exception to allow elevated noise levels in outdoor living areas. Outdoor living areas such as patios and balconies may be incorporated into multifamily development projects in areas which experience elevated noise levels. These noise levels may not exceed the "Normally Unacceptable" Community Noise Exposure levels (75dB and above) specified in Figure 2 of the "Noise Element Guidelines" (Appendix C of the California General Plan Guidelines). Furthermore, prospective buyers and future occupants of dwellings shall be provided with the following notice:
This property is presently located in an urban area which periodically and regularly experiences elevated noise levels. Potential sources of this noise may be automobile traffic, railroad operations, flying aircraft, industrial/commercial uses and general human activity in an urban environment. You may wish to consider what noise level annoyances, if any, are associated with the property before you complete your purchase and/or rental agreement and determine whether they are acceptable to you.
24. Health Department Requirements: Detailed plans shall be submitted to the Santa Barbara County Health Department for review and approval prior to plans being submitted to the City for approval and issuance of a building permit.
25. AB 1600 Fees: AB 1600 fees apply to this project.
26. Indemnification: The applicant shall agree to indemnify, defend (with counsel reasonably approved by the City), and hold harmless the City of Santa Maria and its officers, officials, employees, and agents from and against any and all claims, demands, actions, proceedings, lawsuits, losses, damages, judgments and/or liabilities by third parties arising out of, related to, or in connection with the project application or to attack, set aside, void, or annul, in whole or in part, an approval of the project application by the City and any related environmental approvals, development approvals or project conditions. The Applicant shall reimburse the City, its agents, officers, officials, or employees, for any court costs and attorney’s fees that the City, its agents, officers, officials, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve Applicant of his/her obligations under this provision.
27. Agency Requirements: The applicant shall ascertain and comply with all Federal, State, County and City requirements as are applicable to this project.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 10 -
28. Construction Documents: A copy of these conditions shall be incorporated into all construction documents.
29. Construction Hours: Construction activities shall be limited to the hours of 7:00 a.m. to 6:00 p.m., Monday through Friday, and 8:00 a.m. to 5:00 p.m. on Saturdays. No construction activities are to occur on Sundays or holidays. A note to this effect shall appear on all construction documents.
30. Mitigation Monitoring and Reporting Program: The mitigation measures in the Mitigation Monitoring and Reporting Program for the previously adopted Environmental Impact Report (SCH# 90010930) are hereby incorporated and attached for reference.
Public Works Department
ENGINEERING CONDITIONS
31. Public Improvement Plans: Public Improvement Plans (PIPs) are required for the development of this site. The improvement plans shall show complete plans, profiles, and details for all required improvements to be constructed, both public and private, including common areas. Reference may be made to the Standard City Engineering Specifications and Drawings in lieu of duplicating the standard drawings. All standards of agencies other than the City of Santa Maria shall appear on the plans in full and not by reference. PIPs shall be reviewed and approved by the City Engineer prior to building permit issuance and incomplete submittals may delay building permit issuance. The PIPs shall include the following:
A. Plan and profile drawings for all surface and underground improvements. Plans and profiles shall be drawn to the scale of one-inch equals 40 feet or larger unless otherwise approved by the City Engineer. Details shall be drawn to a scale that clearly shows the facility being constructed. The scales for various portions of the plans shall be shown on each sheet. These may include, but are not limited to:
i. Public Water Mains
ii. Public Sewer Mains
iii. Public Storm Drain Mains
iv. Traffic Signal and/or Roundabout
v. Frontage Improvements
1. Curb
2. Gutter
3. Sidewalk
4. Driveways
5. Streetlights
6. Fire Hydrants
vi. Traffic signs for all streets. These may include, but are not limited to:
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 11 -
1. Regulatory signs
2. Warning signs
3. Guide signs
B. Landscaping and irrigation plans for any area of public right-of-way where landscaping is required (such as medians) or where landscaping is to be maintained as part of a city landscape maintenance district. Confirm requirements with the Recreation and Parks Department regarding necessary landscaping, irrigation, and water meters to be installed.
C. The Engineer shall submit four full size copies of the Public Improvement Plans to the Public Works Department for review, in addition to an electronic copy.
D. All public improvements shall be constructed according to City and State standards. Plan check and inspection fees per City Council Resolution 2005-101 will apply. The developer shall submit a cost estimate completed by a registered civil engineer for the proposed public improvements and make a monetary deposit with the City. Cost estimates shall include a separate item for contingencies in the amount of ten percent of the estimated actual cost. The estimate submitted by the subdivider’s engineer shall be subject to review and approval by the City Engineer. An approved final estimate shall be used to establish construction inspection fees, to establish the plan checking fee, and for establishing required amounts of security as required by Section 11-
8.06 of the City of Santa Maria Municipal Code. The form of security shall be subject to the approval of the City Attorney.
32. Building Plans: At time of building plan submittal, the developer shall identify the following items on the site or utility plan for the subject project:
A. Location and sizes of all existing water mains, sewer mains, water meters, water service lines, backflow prevention devices, private sewer lateral connections, and storm drainage facilities in abutting streets or on the project site.
i. Each unit or lot shall be served by a sanitary sewer system, adequate domestic water system, natural gas, electric, and telephone facilities.
Cable television facilities shall be provided pursuant to Chapter 15 of Title 9 of Santa Maria’s Municipal Code.
B. Location and sizes of all proposed water mains, sewer mains, water meters, water service lines, backflow prevention devices, private sewer lateral connections, and storm drainage facilities in abutting streets or on the project site.
i. Each unit or lot shall be served by a sanitary sewer system, adequate domestic water system, natural gas, electric, and telephone facilities.
Cable television facilities shall be provided pursuant to Chapter 15 of Title 9 of Santa Maria’s Municipal Code. If these are not existing, they shall be proposed to be installed as part of this project.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 12 -
C. Location, quantity, and orientation of trash enclosures D. All parcel lines and easements crossing the project site.
E. Locations and dimensions of all existing and proposed driveways and sidewalks
F. Location of waste grease containers. Waste grease containers shall not be placed within trash enclosure.
G. Location of existing and proposed fire hydrants
H. Required public improvements.
I. Limits of frontage improvements
J. Curb treatment and any required fire-lane or no-parking designation
33. Utilities Connection Fees: For all development projects already connected to the utility system, the water and wastewater fees shall be based solely on an increase in water meter size or a change in use and shall be calculated and collected prior to installation of the larger meter or making a change in use. The State Water Reimbursement Fee shall be collected concurrently with the Growth Mitigation Fee. The following fees are to be paid by the applicant and will be collected at time of request for connection at the Building Division, 110 South Pine Street, Suite 101.
A. Water Mitigation Fee: The fee is calculated based on the size of water meters (domestic, landscape, fire) serving the site. The fee shall be based upon the codes and rates in effect at the time of building permit issuance (Santa Maria Municipal Code (S.M.M.C.) Sections 8-15.01 through 8-15.15 and 8-15.19).
B. Wastewater Mitigation Fee: The fee is calculated based on the size of water meters (domestic) serving the site. The fee shall be based on the codes and rates in effect at the time of building permit issuance (S.M.M.C. Sections 8-
15.01 through 8-15.15 and 8-15.20).
C. State Water Reimbursement Fee: The fee is calculated based on the size of water meters (domestic, landscape, fire) serving the site. The fee shall be based on the codes and rates in effect at the time of building permit issuance (S.M.M.C. Section 8-10.05.01).
D. Traffic Mitigation Fee: The traffic mitigation fee shall be paid by the applicant at time of occupancy. The fee is based on the size and proposed use of the project. The final fee calculation is based on the fee schedule in effect at the time of building permit issuance (S.M.M.C. Sections 8-15).
E. The City Council may consider allowing qualifying commercial and industrial development the ability to pay growth mitigation fees as outlined in the current PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 13 -
fee schedule over a period of time. The maximum amount of time for payback shall be five years. The payments shall be made yearly, and interest shall be paid. Interest calculations shall be based on the average annual interest rate for the Local Agency Investment Fund. Qualifying companies who wish to pursue this option shall sign an agreement, in a form approved by the City Attorney, and shall provide financial security guaranteeing payment.
F. Other Fees: The following fees are to be paid by the applicant and will be collected prior to issuance of building permit.
i. Streetlight Fee: When the building site does not meet the minimum frontage described S.M.M.C. Section 12-28.05, a streetlight fee shall be paid to the City according to the most current streetlight fee schedule.
ii. Alley Light Fee: When the building site does not meet the minimum frontage described S.M.M.C. Section 12-28.05, an alley light fee shall be paid to the City according to the most current alley light fee schedule. In lieu of paying the alley light fee, the applicant may elect to install an alley light.
iii. The Planning Commission may modify the street and alley light requirements when reviewing a conditional use permit or planned development permit if it makes written findings based on substantial evidence considering the entire record of proceedings that the requirements would result in a unique hardship based on special circumstance applicable to the property (S.M.M.C. Section 12-28.05).
STREET AND FRONTAGE CONDITIONS
34. Street Light Conduit Location: Refer to City Standard Drawing RD-31 regarding typical utility location and spacing. Streetlight conduit shall be located on the north side of an east/west street, or east side of a north/south street.
A. Exact relocation of existing streetlight(s) on Railroad Avenue shall be per the direction of the City Engineer.
35. Standard Driveway: Driveways shall be installed per City Standard Drawing RD-12A/RD-13A and have ADA compliant pedestrian access. Driveways shall have minimum throat width of 24 feet.
Nearest edge of driveway shall be located a minimum of five feet from any above-ground utility such as streetlights or fire hydrants, and ten feet from any street trees. A minimum 20 foot separation between driveways is required and the aggregate width of all driveways shall not exceed 50 percent of the property’s frontage along the street (S.M.M.C. Section 8-6.07).
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 14 -
36. ADA Compliance: Curb ramps located at the Railroad Ave and Hidden Pines Way roundabout shall be removed and replaced to current ADA requirements. See Caltrans Standard Drawing A88A.
37. Frontage Repair: The developer shall repair any cracked, broken, or uplifted curb, gutter, sidewalk, or alley within the project frontage. City Public Works Inspection staff will determine the extent of the frontage repair in the field prior to construction. An encroachment permit will be required prior to issuance of a building permit for these repairs.
38. New Frontage Improvements: The developer shall be required to install full frontage improvements including curb, gutter, sidewalk, streetlights, and landscaping wherever missing or required by the Public Works Department.
A. The existing sidewalk along the project frontage on Railroad Avenue shall be removed and replaced with a new sidewalk having a minimum clear width of five feet.
39. Sidewalk ADA Compliance: The developer shall remove and replace any sidewalk within the project frontage that does not meet ADA cross-slope requirements.
40. Intersections: Sight distance requirements shall be maintained at the intersection of any street, alley, or driveway improved for vehicular traffic per S.M.M.C.
Sections 12-27.02 and 12-27.03.
A. Prior to occupancy, the developer shall install red curb and any associated parking restrictions adjacent to the project driveways on Hidden Pines Way and Railroad Avenue, consistent with the approved traffic study and as approved by the City Engineer. Final limits shall be established during Public Improvement Plan review based on sight-distance requirements.
41. City Encroachment Permit: The developer shall obtain an encroachment permit from the Public Works Engineering Division prior to any work in public streets, alleys, or easements (S.M.M.C. Section 8-6.06).
42. Facility Easements: Prior to issuance of building permits, the developer shall provide reciprocal access or utility and drainage easements if required by the Public Works Department for the subject project.
A. Dedicate public water and sewer easements over all public water and sewer mains and appurtenant facilities located within the project site. The location and width of each easement shall be approved by the City Engineer and Utilities Department.
B. Dedicate a blanket reciprocal drainage easement over all lots within the project site for shared drainage, including access for the construction, inspection, operation, maintenance, repair, and replacement of the project’s shared drainage facilities.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 15 -
43. City Dedicated Easements: If any easements are required to be dedicated or vacated, the developer shall submit legal descriptions, sketches (8.5” x 11” City Standard Format), closure calculations, current title report, and payment of processing fees. All paperwork shall be approved prior to issuance of building permits and recorded prior to occupancy.
A. This will be required for any easement(s) not recorded via the Tract Map.
B. Prior to issuance of building permits, the developer shall dedicate additional public street right-of-way along the Railroad Avenue project frontage as necessary to accommodate the ultimate street section and required public frontage improvements. The final width, location, and limits of dedication shall be shown on the Public Improvement Plans and approved by the City Engineer. The dedication shall be completed and recorded prior to issuance of building permits, unless otherwise approved by the City Engineer.
44. Chip Seal: Developer shall be required to restore asphalt pavement surface to the pre-development condition by placing chip seal compliant with City Standards along the property frontage where trenching and utility cuts are required within City right-of-way. The chip seal shall be applied for the full width of the roadway for 50’ beyond all cuts within the asphalt pavement and the roadway striping shall be restored to pre-construction layout.
WATER CONDITIONS
45. Privately Owned On-site Water Lines: Water lines for fire suppression shall be separated from water lines used for domestic water.
46. Fire Suppression Line: Fire suppression lines shall be constructed with appropriate Double Check Detector Assembly (DCDA) fire service backflow prevention assemblies per Standard Detail WA-27F at connection to the public main, located at the property line. These fire service backflow prevention assemblies separate privately owned and maintained water lines from public water lines. On-site fire hydrants and fire sprinklers shall be supplied from this on-site water line and connections shall occur after the backflow prevention assembly. If multiple connections or a looped system is required to meet fire flow requirements, each connection to the Public main shall have an appropriate DCDA.
47. Fire Hydrants: The location, placement, and sizing of on-site water lines and fire hydrants shall be approved by the City Fire Department and Public Works Department.
48. Backflow Prevention: Reduced pressure principle (RP) type backflow prevention assemblies shall be installed on all domestic water services. The devices shall be installed near the property line before any branches by a licensed plumber according to City specifications and standard drawings. The devices shall be tested by a certified backflow prevention tester with test results submitted to the City’s Regulatory Compliance Specialist prior to final occupancy.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 16 -
WASTEWATER CONDITIONS
49. Acceptance of Public Infrastructure: Prior to issuance of Certificate of Occupancy, the developer shall clean and verify the integrity of all sanitary sewer infrastructure to the satisfaction of the Public Works Inspector. Inspections at installation do not waive the requirement for re-inspection prior to acceptance by the City.
50. Municipal Code: Discharge into the City’s sewer system shall comply with municipal code discharge restrictions and requirements (S.M.M.C. Section 8- 12).
51. Traps: Grease, oil, lint, hair and/or sand traps shall be provided and maintained in good working order at all times when, in the opinion of the Utilities Manager, they are necessary for the protection of the wastewater collection and treatment. (S.M.M.C. Section 8-12.413)
52. New Sewer Lines: All sewer pipes crossing or parallel to public water facilities shall be constructed according to the requirements of the State Water Resources Control Board Division of Drinking Water.
53. New Sewer Lateral: All sewer laterals shall be constructed in compliance with City Standard Drawing SS-14B. Sewer laterals shall be
privately maintained infrastructure and connect to City infrastructure with a wye connection. Sewer laterals shall not tie in at a Public manhole.
STORM WATER CONDITIONS
54. Construction Storm Water Requirements (Site > 1 Acre): The developer shall obtain a Storm Water Pollution Prevention Plan (SWPPP) prepared by Qualified SWPPP Developer (QSD). The SWPPP must be reviewed and approved by the Public Works Department prior to issuance of grading and encroachment permits. The developer shall submit the SWPPP and file a Notice of Intent (NOI) with the Central Coast Regional Water Quality Control Board. The submittal is typically handled online through the Regional Board’s SMARTs website. (https://smarts.waterboards.ca.gov/smarts/).
55. SWPPP Review Fee: The developer shall submit a hard copy and an electronic copy of the SWPPP for review and approval prior to any building permit issuance. A SWPPP review fee will be invoiced prior to approval.
56. Cost Estimate and Treasurer’s Trust: A detailed cost estimate for the installation and maintenance of the Best Management Practices (BMPs) to be implemented as defined by the SWPPP will be generated from the City’s SWPPP review. Prior to grading permit issuance, the developer shall submit a cash deposit in the amount of the approved cost estimate to be held as a Treasurers Trust. The Treasurer’s Trust is intended to guarantee installation and maintenance of the required BMPs. The City will draw from this Treasurer’s Trust in the event the developer/contractor does not install or maintain the required BMPs. The PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 17 -
Treasurer’s Trust shall be returned after Certificate of Occupancy is issued, minus any funds expended by the City to install/maintain the required BMPs on behalf of the developer/contractor.
57. SWPPP/Post-Construction Requirement Monitoring Encroachment Permit: Prior to issuance of grading permits, the developer shall obtain an encroachment permit from the Public Works Office to cover inspection of the approved SWPPP and installation of required Post-Construction Requirements. Permit and inspection fees will be due when the permit is issued and expiration of the encroachment permit will be based on the construction schedule identified in the SWPPP Notice of Intent. Time extensions will require additional funds to be provided to cover the additional inspections.
FLOOD CONTROL CONDITIONS
58. Regional Basin Storm Drainage: On-site retardation is not required for this site because it is served by a regional retardation basin
constructed with North Preisker Ranch Tract 5764.
POST-CONSTRUCTION STORM WATER CONDITIONS
59. Post-Construction Storm Water: The Central Coast Regional Water Quality Control Board requires that all new projects that create or replace 2,500 square feet or more of impervious area must follow the post-construction requirements (PCRs). The Stormwater Technical Manual and further guidance on completing an SCP are available online (https://www.countyofsb.org/2324/New-Redevelopment).
A. The developer shall demonstrate project compliance with the PCRs by submitting a Stormwater Control Plan (SCP) using the template provided in the Stormwater Technical Guide.
B. The SCP shall include a site plan, Stormwater Control Measure (SCM) sizing calculations, details of bioretention design, and dimensions of drainage management areas.
C. The SCP shall include an Operation and Maintenance (O&M) plan, detailing how the site and required post-construction improvements shall be maintained into perpetuity by the owner.
D. A SCP is required and shall receive preliminary approval from the Public Works Department prior to discretionary approval of the Planning Permit. The developer shall resubmit the SCP with the Building Plan submittal for final review and approval. The resubmittal is to account for any necessary changes to the site plan between entitlement and construction.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 18 -
E. Underground Chambers: For developments proposing to utilize underground chamber systems for the basis of stormwater management, the inlets, chambers, and any infrastructure that drains to the underground chamber system shall be cleaned, and video inspection provided to verify the performance of the underground chamber system wasn’t compromised during project construction activities. Cleaning and maintenance of this infrastructure shall be followed as per the manufacturer’s specifications and the approved stormwater operations and maintenance plan. All cleaning and maintenance activities shall be documented and provided to the Utilities Department, Regulatory Compliance Division on an annual basis.
F. As required by Section D, Field Verification of Post-Construction Stormwater Measures, of the California Central Coast Regional Water Board Resolution R3-2013-0032, Post-Construction Stormwater Management Requirements for Developments Projects in the Central Coast Region, the Developer shall secure a qualified third-party (registered professional engineer, geologist, architect and/or landscape architect) for purposes of inspection, verification, and certification of all Stormwater Control Measures (SCMs) to ensure site design, water quality treatment, runoff retention, and/or peak management controls have been implemented in accordance with the Regional Water Board’s Post-Construction Requirements.
G. Grading plans shall include the following language:
i. Provide installation elevation by licensed surveyor to Public Works Department, Engineering Division within 7 calendar days of installation. ii. Provide basin dimension and depth, including outlet structure cross section with elevations, signed and stamped by the Engineer of Record who prepared the Stormwater Control Plan to the Public Works Department, Engineering Division, within 7 calendar days of installation. iii. Provide copy of invoice of installed gravel and bioretention soil media, along with photo-documentation of complete structure cross sections to Public Works Department, Engineering Division, within 7 calendar days of installation.
H. The following shall occur prior to final SCP approval:
i. Engineer of Record that prepares the SCP shall provide documentation of critical design elements in structures that are underground, buried, or otherwise hard to verify after installation. Critical elements include elevations of the bottom of bioretention, top of gravel, and overflow structures.
ii. The property owner shall sign a Post-Construction Stormwater Control Measures Maintenance Agreement form with the City of Santa Maria. The form will be provided by Public Works after the final review PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 19 -
of the SCP. The agreements shall be approved, signed, and attached to the property address prior to issuing the Certificate of Occupancy.
60. Multi-family and Commercial/Industrial Facilities: As mandated by state law, this development is required to comply with all applicable laws and regulations pertaining to solid waste disposal and recycling, the City of Santa Maria Mandatory Organic Waste Disposal Reduction Ordinance No. 2021-10, Chapter 8-21, and Title 8, Chapter 8-11 of the City of Santa Maria Municipal Code.
A. The developer shall submit a site plan identifying location(s) of each solid waste enclosure (“Enclosure”) to contain refuse and recycling (including single stream recycling and organics) bin(s)/container(s). The proposed location of each enclosure shall enable tenants to dispose of their refuse and recyclable materials safely and efficiently. The site plan shall be reviewed and approved by the City prior to issuance of building permits.
B. All Enclosures shall be constructed per City standard drawing MS-16B.
C. The proposed quantity of Enclosure(s) for the subject site shall be reviewed and approved by the City.
D. The service frequency of each bin/container shall be determined by the City.
E. In cases where Enclosure(s) are proposed to be installed abutting structures, the common wall shall be of a non-combustible masonry-type material with no openings for vents or windows.
F. Enclosure(s) shall be reserved exclusively for solid waste bin(s)/container(s) storage. Miscellaneous boxes, bins, racks, grease containers, etc., is not permitted within the enclosure.
G. If City collection vehicles (“Collection Vehicles”) will be traveling through a gated area to service bin(s)/container(s), the gates shall be equipped with a coded electronic keypad system.
H. The developer shall design site travel ways, entrance, and exit areas with sufficient space, free of obstructions (trees, oversized islands, etc.) to allow for Collection Vehicles to safely enter/exit the subject site to avoid damage to site property or Collection Vehicles. See City standard drawing MS-16B for guidance.
I. The developer shall design all site vehicle travel ways to withstand loads imposed by Collection Vehicles.
J. The developer shall submit a truck turning template route for solid waste service area. The Collection Vehicles must be able to enter and exit the site to gain access to the Enclosure(s) with minimal backing. Collection Vehicles have an inside turning radius of 38 feet and an outside turning radius of 55 feet. See City standard drawing MS-16B for guidance.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 20 -
MODIFICATION OF CONDITIONS
61. The Director of Public Works, Planning Commission, and Council reserve the right to modify these conditions if they deem it necessary to ensure compliance of the project with Chapter 8-6 of the S.M.M.C. (S.M.M.C. Section 8-6.09).
Fire Department
62. Key Box: A SMFD approved key box shall be provided at the main entrance to each commercial building/tenant space and common spaces for the residential buildings such as fire sprinkler riser rooms. The box shall contain all the keys necessary to allow Fire Department access to all portions of the building or tenant space (CFC Section 506).
A. The box shall be installed in accordance with the manufacturer's specifications and placed so the bottom of the box is 60 inches above the adjacent grade.
The proposed location of the box shall be shown, or this note placed on the plans.
B. Key box application is available online at http://www.ci.santa-maria.ca.us/40463-KnoxBoxRequestForm.pdf. The key box shall be ordered prior to occupancy request.
C. Knox Box 3200 Series is the minimum acceptable box for commercial installations. Knox boxes identified as "Residential" shall not be used for commercial applications.
63. Address Numbers: Numbers shall be clearly visible from the centerline of the roadway fronting the building and shall contrast with their background. Number height shall be a minimum of six inches for single family residential buildings and a minimum of 12 inches for multi-family residential and commercial buildings. The proposed location and design of address numbers shall be shown, or this note placed on the plans CFC Section 505 & SMMC Section 9-28.050).
64. Access Roads: An approved SMFD access road shall extend to within 150 feet of all portions of the exterior walls of the first story of the building, as measured by an approved route around the exterior of the building CFC Section 503 & SMMC Section 9-28.050).
A. Minimum road standards shall be 4-inch class II road base compacted to 95 percent and an all-weather surface such as asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing up to 75,000 pounds (CFC Appendix D102.1 and SMMC Section 9-
28.050).
B. The minimum unobstructed width for buildings below 30 feet is 24 feet (CFC Appendix D105 and SMMC Section 9-28.050).
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 21 -
C. Overhead vertical clearance shall be a minimum of 15½ feet (CFC Section 503.2.1 & SMMC Section 9-28.050).
D. Access roads, permanent or temporary, shall be installed and approved by the SMFD prior to vertical combustible construction (CFC Section 501.4).
65. Turning Radius: The minimum turning radius shall be designed to accommodate the SMFD’s ladder truck. The proposed fire access turning radii shall be verified by submittal of design drawings created by Auto Turn software or equivalent. Turn radius specifications are available by request CFC Appendix Section D103.3).
66. Temporary Fire Access Road Signage: Temporary access signage shall be placed at each entrance to the project (when necessary) to delineate construction and fire access. Signage design is provided in SMFD Development Guidelines. These signs shall be installed prior to combustible construction (CFC Appendix D101.1).
67. Temporary Access Roads: Plans for temporary access roads shall be reviewed, inspected and approved by the SMFD prior to construction in accordance with CFC Section 501. Temporary access roads shall be constructed with compacted base, curbs and gutters prior to vertical combustible construction. Access roads shall be maintained clear and unobstructed for the duration of the construction project (CFC Section 503.2.2).
68. Fire Lane Signs: "No Parking, Fire Lane" signs shall be posted at entrances. Signs shall be designed per SMFD Development Guidelines. All curbing in a designated Fire Lane or fire access way shall be painted red with “Fire Lane, No Parking” graphics stenciled every 100 linear feet or as otherwise designated on approved plans (CFC Section 503.3, Appendix D103.6 & SMMC Section 9-28.050).
69. Fire Flow: Fire flow shall comply with CFC, Appendix B. The minimum fire flow for this project shall be 1500 gallons per minute (based on Type 5B Construction, with fire sprinklers, as required).
70. Fire Hydrants: Fire hydrants shall be installed per City of Santa Maria Public Works Standards.
A. Fire hydrant spacing and distribution shall comply with CFC Section 507 and CFC Appendix C. The new hydrants shall be spaced at an average of 500 feet and at no point shall exceed 250 feet from a fire hydrant on a fire apparatus access road. Fire hydrants shall be installed and operational prior to vertical combustible construction.
B. Hydrants shall be equipped with one four and a half inch (4 ½”) outlet and two 2 and half inch (2 ½”) outlets.
C. The SMFD, or a designated representative, shall inspect and approve all fire hydrant installations for operational readiness prior to combustible construction (CFC Section 501.4).
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 22 -
71. Fire Hydrant Protection: On-site fire hydrants shall be painted red and protected from impact in accordance with City Of Santa Maria Public Works Standards and SMFD Development Guidelines (CFC Section 507.5.6 & SMMC).
72. Water Mains: Water Mains shall be installed per City of Santa Maria Public Works and NFPA standards. The minimum main size shall be 8 inches, or as determined by hydraulic calculations (CFC Section 507 & SMMC).
73. Hydrant Markers: Reflective blue dot fire hydrant location markers shall be installed (SMMC).
74. Fire Sprinkler Systems: Automatic fire sprinkler systems are required for residential buildings in accordance with CFC and NFPA Standards. The following commercial occupancies shall be equipped with an automatic fire sprinkler system (CFC Section 903 & SMMC Section 9-28.060):
Group “A” Occupancies when the gross floor area is 5,000 square feet or more.
Group "B" Occupancies when the gross floor area is 5,000 square feet or more.
Group “M” Occupancies when the gross floor area is 5,000 square feet or more.
A. All commercial fire sprinkler systems shall be equipped with a local water flow alarm.
B. Deferred submittal of fire sprinkler plans, and calculations is required. The plans and calculations shall be wet stamped by a registered Fire Protection Engineer (FPE) licensed in California when required by the fire code official.
75. Fire Department Connection (FDC): FDCs shall be located on the front access side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the Fire Chief or his/her designee (CFC Section 912). The FDC shall:
A. Face the public street or fire lane fronting the protected building and be installed so the center line of the connection is a minimum of 36 inches above finished grade.
B. Within 40 feet of an approved roadway or driveway and arranged so that hose lines can be readily attached to the inlets without interference.
C. Within 75 feet of an approved fire hydrant.
D. Be equipped with Knox Brand locking caps.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 23 -
76. Fire Alarm System: A fire alarm system shall be installed in accordance with the CFC and NFPA 72 standards. The fire alarm system shall be certificated by Underwriters Laboratories or an equivalent nationally recognized organization CFC Section 907 & SMMC 9-28.060).
A. Deferred submittal of fire alarm plans is required. The plans shall be wet stamped, on every sheet, by a registered FPE licensed in California if required by the fire code official.
B. A Fire alarm system, at a minimum incorporating tamper switches on control valves and a Central Station service for the water flow alarm shall be installed for the fire sprinkler system.
77. Smoke Detectors/Alarms: Smoke detectors/alarms shall be installed in accordance with the CFC, CBC, and NFPA 72.
78. Fire Extinguishers: Fire extinguishers shall be located and sized in accordance with CFC Section 906.
79. Directory Signs: A project directory, including a map and listing of all units on the site shall be posted at the entrance to the property and indicated on the project plans (SMFD Policy).
Recreation and Parks Department
80. Tree Species: Five street trees will be required along Railroad Avenue, and six street trees will be required along the frontage of Hidden Pines Way. A minimum of one street tree shall be planted in front of each residence. All street trees shall be placed a minimum of five feet from all impervious structures. City street trees are to be selected from the medium to large City approved street tree list and complement the surrounding streetscape.
81. Tree Specifications: The street trees shall be 24-inch box in size and have a minimum caliper of 1.5 inches. The trees shall be planted six feet behind the sidewalk by a licensed landscape contractor in accordance with the plans and specifications of the Recreation and Parks Department. An irrigation system shall be provided for the trees.
82. Tree Bonding: Street tree bonding shall be for eleven tree plantings at $275 each totaling $3,025.00. Tree bonds are to cover a one-year establishment starting at issuance of the Occupancy Permit. Street tree requirements and bond amount are a maximum subject to change during building permit review. The tree bond is due at time of building permit issuance as a cash or surety bond delivered to Recreation and Parks at 615 S. McClelland St.
PD2025-0001 AND U2025-0002 NOVEMBER 17, 2026
COURTYARD AT HIDDEN PINES PLANNED DEVELOPMENT PERMIT
- 24 -
83. Tree Planting: Any nursery stock tree planted without inspection and approval by the Recreation and Parks Department shall be deemed defective and be removed by the person(s) responsible for the planting at their own expense. All plant material shall not be root bound or contain girdling roots. Street tree location(s) shall be approved onsite by the Special Districts Supervisor prior to installation.
84. Landscape Plans: The following shall be noted on the landscape plan: “the final locations of street trees shall be determined on-site by the Special Districts Supervisor. Twenty-four-hour notice is required for inspection prior to planting, (805) 925-0951 ext. 2346. Installation shall be in accordance with Recreation and Parks Department specifications.”
85. Park Impact: Residents of the Courtyard at Hidden Pines are prohibited from parking their cars at North Preisker Ranch park overnight or for extended periods during the day. Violators may face penalties, including fines and towing of vehicles.
86. Development Fees: Per the Municipal Code, several Recreation and Parks Development Fees may apply to this project.
A. Subdivision in Lieu $2,764.00
B. Residential Development Tax $185.00
C. Single Family Growth Mitigation $2.14/square foot
D. Multi-family/Senior Growth Mitigation $3.27/square foot E. Commercial Growth Mitigation $0.01/square foot Note: fees are reviewed annually and are subject to change.
87. Landscape district advisory: This project is included in the Northwest landscape maintenance district.
NOTES:
In accordance with Section 12-35.109 of the Municipal Code, this permit is not valid until the 15th calendar day following the issuance of the permit, providing no appeal is filed; or if an appeal is filed, this permit is not valid until the effective date of the final action on the appeal.
In accordance with Section 12-35.504 of the Municipal Code, the City may modify conditions of approval of the permit, or may revoke the permit for non-compliance with any of the conditions of approval, or if any operations under the approved permit result in detriment to the public health, safety or welfare.
This permit will not be valid until the applicant and property owner have submitted signed acknowledgment of their consent to the conditions, in accordance with Section 12-35.109 of the Santa Maria Municipal Code, to the Planning Division of the Community Development Department.
In accordance with Section 12-35.501 of the Municipal Code, this permit shall become null and void if the permit is not established within three years of the permit’s effective date or after establishment the use is discontinued or abandoned for a period of six months. However, the approval body may consider extensions of time for additional periods of up to two years. A written request justifying the need and the appropriate filing fee filed with the Community Development Department shall be submitted prior to the expiration date.
Failure to comply with any of the conditions stated above may be cause for revocation or modification of this permit, in addition to any other penalties provided by law. All conditions of approval are to be completed prior to occupancy unless otherwise stated, and are to be maintained in perpetuity. 04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA T1
ENTITLEMENT
PACKAGE
SHEET INDEX
TITLE SHEET T1
INSPIRATION IMAGE BOARD - COMMERCIAL T2
INSPIRATION IMAGE BOARD - RESIDENTIAL T3
TENTATIVE TRACT MAP C1
PRELIMINARY GRADING PLAN C2
PRELIMINARY UTILITY PLAN C3
DETAILS AND SECTIONS C4
CONCEPTUAL LANDSCAPE PLAN L01
CONCEPTUAL LANDSCAPE PLAN ENLARGEMENT L02
PLANT IMAGERY L03
ARCHITECTURAL SITE PLAN A0
BUILDING 1-3 FLOOR PLAN A1
BUILDING 1-3 ELEVATIONS A2
BUILDING 1-3 COLORS & MATERIALS BOARD A3
BUILDING 4 FLOOR PLAN A4
BUILDING 4 ELEVATIONS A5
BUILDING 4 COLORS & MATERIALS BOARD A6
BUILDING 5 FLOOR PLAN A7
BUILDING 5 ELEVATIONS A8
BUILDING 5 ELEVATIONS A9
BUILDING 5 COLORS & MATERIALS BOARD A10
BUILDING 6 FLOOR PLAN A11
BUILDING 6 ELEVATIONS A12
BUILDING 6 COLORS & MATERIALS BOARD A13
BIRD’S EYE VIEW A14
COURTYARD VIEW A15
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA
PROJECT SUMMARY
PROJECT ADDRESS: 2415 N. RAILROAD AVE. SANTA MARIA, CA
APN: 117-930-014
LOT SIZE: 2.80 ACRES
ZONING: PD/PF
CURRENT USE: VACANT LOT
ADJACENT ZONES: PD / R1 / RSL-1
DEVELOPMENT STANDARDS
PD/PF
DENSITY PROPOSED 14 RESIDENTIAL DWELLING UNITS
COMMERCIAL
(SIMILAR TO CC ZONE)
SECTION 12-11 DEVELOPMENT STANDARDS
HEIGHT
(PROPOSED)
30’
COMMERCIAL BLDG. 5 = 30’
COMMERCIAL BLDG. 6 = +/- 26’
FRONT
(PROPOSED)
10’
REFER TO SITE PLAN
SIDE
(PROPOSED)
5’
REFER TO SITE PLAN
REAR
(PROPOSED)
15’
REFER TO SITE PLAN
RESIDENTIAL:
(SIMILAR TO R2 ZONE)
SECTION 12-7 DEVELOPMENT STANDARDS
HEIGHT
(PROPOSED)
30’
LOT 1-6 ATTACHED RESIDENTIAL UNITS = +/- 17’
BLDG. 4 CONDO UNITS = 27’-8”
SETBACKS
FRONT
(PROPOSED)
(12’ W/ SIDE FACING GARAGE)
10’-6” - 12’-0”
SIDE
(PROPOSED)
ON INTERIOR LOTS, ONE SIDE YARD SHALL BE A
MINIMUM OF 5 FEET AND THE OTHER 10 FEET
5’-0”
CORNER LOT
(PROPOSED)
12’
16’-0”
REAR
(PROPOSED)
10’
13’-0”
LANDSCAPE REQUIREMENT
(PROPOSED)
A LANDSCAPED AREA OF NOT LESS THAN 300 SQUARE
FEET, EXCLUSIVE OF REQUIRED YARDS, SHALL BE
PROVIDED ON THE SAME BUILDING SITE FOR EACH
DWELLING UNIT.
350 SQFT
RESIDENTIAL CONDOMINIUMS SECTION 12-46 DEVELOPMENT STANDARDS PRIVATE OPEN SPACE MINIMUM OF 200 SQUARE FEET OF PRIVATE PATIO OR YARD AND/OR BALCONY ON GROUND FLOOR. 50 SQFT
OF BALCONY ABOVE.
STORAGE SPACE 300 CUBIC FEET MIN.
MIXED USE SECTION 12-49 DEVELOPMENT STANDARDS
SETBACK MIXED USE PROJECTS ADJACENT TO AN R-1 ZONING
DISTRICT REQUIRE ONE-FOOT OF BUILDING SETBACK
FOR EACH FOOT OF BUILDING HEIGHT
LANDSCAPE R2 20% COMMON AREA CC 15%
VICINITY MAP
TITLE SHEET 2624 AIRPARK DR. SANTA MARIA, CALIFORNIA 93455 · 805/934-5760 · FAX 805/934-3448 · https://urbanplanningconcepts.com
VICINITY MAP
PROJECT SITE
2624 AIRPARK DR. SANTA MARIA, CALIFORNIA 93455 · 805/934-5760 · FAX 805/934-3448 · https://urbanplanningconcepts.com
VICINITY MAP
PROJECT SITE
SITE
RAILROAD AVE
HIDDEN PINES WAY
SANTA MARIA RIVER 101 FREEWAY
PREISKER PARK
BIKE PARKING REQUIREMENTS
USE SQFT /
OCCUPANTS
SPACES REQUIRED
CONDOMINIUM UNITS
* FOR RESIDENTIAL, SHORT-TERM BICYCLE PARKING
SPACE SHALL BE PROVIDED AT A RATIO OF 0.05
BICYCLE PARKING SPACES PER BEDROOM (STUDIO
UNITS COUNTING AS ONE BEDROOM); AND LONG-TERM BICYCLE PARKING SHALL BE PROVIDED AT A RATIO OF 0.25 BICYCLE SPACES PER BEDROOM
(MINIMUM OF 2).
SHORT TERM PARKING:
0.05 SPACES / 1 BEDROOM
LONG TERM PARKING:
0.25 SPACES / 1 BEDROOM
2 SHORT TERM
4 LONG TERM
COMMERCIAL/RETAIL 20,254 SQFT 1 SPACE / 2,000 SQFT 10.1 SHORT TERM * FOR RETAIL/FOOD SALES 1 SPACE PER EACH 2,000
SQUARE FEET OF FLOOR AREA (MINIMUM OF 2)
EVENT SPACE
* FOR EVENT SPACE, ONE SPACE FOR 2%
OF MAXIMUM EXPECTED NUMBER OF DAILY
ATTENDANCE OF THE EVENT VENUE, AND 1 PER EACH
20 EMPLOYEES
12 EMPLOYEES
50 ATTENDEES
1 SPACE / 20 EMPLOYEES
.02 * MAX ATTENDEES
2 SHORT TERM
TOTAL REQUIRED BIKE PARKING 14 SHORT TERM
4 LONG TERM
PROJECT STATISTICS
PARKING
THE SHARED PARKING IS PLANNED TO SERVE BOTH THE RESIDENTIAL AND COMMERCIAL. THE ONLY ASSIGNED SPACES ARE THE 12 GARAGE SPACES AND 16 SPACES FOR THE APARTMENT UNITS. *PARKING PROVISIONS IN THE MIXED-USE ORDINANCE ALLOWS FOR THE RESIDENTIAL UNITS TO HAVE ONLY ONE PARKING SPACE PER UNIT. (SEC 12-49.08 (D)(7). BASED ON THIS PROVISION THIS PROJECT WOULD ONLY NEED TO PROVIDE 68 PARKING SPACES.
EXTRA ON-STREET PARKING SPACES ARE AVAILABLE IN FRONT OF THIS PROJECT ALONG HIDDEN PINES WAY AND RAILROAD AVENUE.
PROJECT DESCRIPTION
THE APPLICANT /LANDOWNER DAN PATIN IS PROPOSING A MIXED-USE DEVELOPMENT KNOWN AS COURTYARD AT HIDDEN PINES. THE PROJECT SITE (APN 117-930-014) CONSISTS OF 2.8 ACRES LOCATED AT THE CORNER OF RAILROAD AVENUE AND PREISKER LANE. THIS PROPERTY IS THE LAST UNDEVELOPED LOT IN THE PREISKER RANCH SPECIFIC PLAN. THE CURRENT LAND USE AND ZONING DESIGNATION IS PF-PUBLIC FACILITIES. THE REQUEST INVOLVES A GENERAL PLAN CHANGE, REZONING AND SPECIFIC PLAN AMENDMENT TO CHANGE THE DESIGNATIONS FROM PF-PUBLIC FACILITY TO R-2 MEDIUM DENSITY RESIDENTIAL.
WITHIN THE RESIDENTIAL DESIGNATED PROPERTY, THE APPLICANT IS PROPOSING 6 SINGLE-FAMILY UNITS, 8 CONDOMINIUM UNITS AND 20,254 SQUARE FEET OF NEIGHBORHOOD COMMERCIAL SPACE PER MIXED-USE
ORDINANCE
RESIDENTIAL
BUILDINGS 1, 2, AND 3 CONSIST OF THREE ATTACHED SINGLE FAMILY BUILDINGS WITH A SHARED WALL RESULTING IN 6 SINGLE-FAMILY UNITS. THESE UNITS ARE ONE STORY AND WILL EACH HAVE TWO CAR GARAGES. EACH UNIT WILL HAVE THEIR OWN LOT AND WILL BE FOR SALE. THESE UNITS WILL PROVIDE A
BUFFER FOR THE EXISTING RESIDENTIAL LOTS TO THE NEIGHBORHOOD COMMERCIAL SPACE PROVIDED ON THE CORNER.
BUILDING 4 IS THE CONDOMINIUM BUILDING AND WILL PROVIDE 8 RENTAL UNITS AT +/- 1,200 SF EACH.
THERE ARE 16 PARKING SPACES WITH A CARPORT AND 4 GUEST PARKING SPACES FOR THE CONDOMINIUM UNITS.
COMMERCIAL USES
THERE IS A COMBINATION OF COMMERCIAL USES INTENDED TO ENGAGE THE COMMUNITY BY DRAWING IN PEDESTRIANS FROM THE SURROUNDING NEIGHBORHOOD INTO THE COURTYARD SPACE. THE GOAL IS TO PROVIDE A “NEIGHBORHOOD PUBLIC MARKET” CONCEPT.
BUILDING 5 CONSISTS OF AN 11,520 SF RECREATIONAL CENTER SPACE THAT CAN HOLD UP TO SIX PICKLEBALL COURTS OR OTHER SPORTS. THIS BUILDING WILL BE OPEN FROM 8:00 AM TO 9:00 PM.
THIS BUILDING ALSO INCLUDES A SINGLE-STORY 4,269 SF RETAIL COMMERCIAL SPACE.
BUILDING 6 IS A SINGLE STORY 4,465 SF RETAIL COMMERCIAL SPACE. THE ANTICIPATED USES FOR THE COMMERCIAL SPACES COULD BE BAKERY/CAFÉ, ICE CREAM SHOP, SMALL NEIGHBORHOOD MARKET, OR A SMALL URGENT CARE CENTER. THE RETAIL SPACES WILL HAVE STANDARD BUSINESS HOURS EXPECTED TO BE 6:30 TO 9:00
COURTYARD
THE 6,783-SF COURTYARD AND PAVILLON WILL PROVIDE SEASONAL EVENT SPACE, AND COMMUNITY
GATHERING OPPORTUNITIES WHICH WILL SERVE AS AN AMENITY TO THE RESIDENTIAL NEIGHBORHOOD AS
WELL WOULD PRIMARILY BE USED FRIDAY THROUGH SUNDAY, STARTING AT NOON AND ENDING AT 9:00, WITH POSSIBLE SEASONAL HOURS AND HOLIDAYS. THE OCTAGON PAVILION WILL BE SEASONALLY
THEMED AS A MULTIPURPOSE ENTERTAINMENT VENUE, WITH ALTERNATING DISPLAYS DEPENDING ON THE HOLIDAY SEASON.
PARKING
THE SHARED PARKING IS PLANNED TO SERVE BOTH THE RESIDENTIAL AND COMMERCIAL. THE ONLY ASSIGNED SPACES ARE THE 12 GARAGE SPACES AND 16 SPACES FOR THE CONDOMINIUM UNITS.
THE PROJECT PROVIDES 72 PARKING SPACES ON SITE.
*PARKING PROVISIONS IN THE MIXED-USE ORDINANCE ALLOWS FOR THE RESIDENTIAL UNITS TO HAVE ONLY ONE PARKING SPACE PER UNIT. (SEC 12-49.08 (D)(7). BASED ON THIS PROVISION THIS PROJECT WOULD ONLY NEED TO PROVIDE 68 PARKING SPACES. EXTRA ON-STREET PARKING SPACES ARE AVAILABLE IN FRONT OF THIS PROJECT ALONG HIDDEN PINES WAY AND RAILROAD AVENUE.
PROJECT DIRECTORY
CLIENT/
APPLICANT:
DAN PATIN
ADDRESS: 26562 SHANE DRIVE
LAKE FOREST, CA 92630
EMAIL: [email protected]
PHONE: (310) 925-1029
ARCHITECT: EHD STUDIO, INC.
ADDRESS: 5960 WEST MALL SUITE B
ATASCADERO, CA. 93422
CONTACT: EDDIE HERRERA
EMAIL: [email protected]
PHONE: (805) 556-7997
PLANNER: URBAN PLANNNING CONCEPTS, INC (UPC)
ADDRESS 2624 AIRPARK DRIVE
SANTA MARIA, CA 93455
CONTACT: BRIAN SCHWARTZ
EMAIL: [email protected]
PHONE: (805) 934-5760
LANDSCAPE: PLEINAIRE
ADDRESS 3203 LIGHTNING STREET, SUITE 201
SANTA MARIA, CA 93455-3203
CONTACT: KEVIN SMALL
EMAIL: [email protected]
PHONE: 805.349.9695
CIVIL: BETHEL ENGINEERING
ADDRESS 2624 AIRPARK DR.
SANTA MARIA, CA 93455
CONTACT: RUSSELL J. GARRISON P.E.
EMAIL: [email protected]
PHONE: (805) 934-5767
AREA TABLE
RESIDENTIAL PROPOSED
ATTACHED SINGLE FAMILY 2,088 FT
CONDOMINIUM UNITS +/- 1,200 SF
RESIDENTIAL GROSS FLOOR AREA (6) ATTACHED SINGLE FAMILY = 34,454 SQFT CONDOMINIUM BLDG. = 12,890 SQFT
TOTAL 47,344 SF
COMMERCIAL
PICKLE BALL 11,520 SF
FITNESS CAFE 4,269 SF
BLDG. 6 4,465 SF
TOTAL 20,254 SF
COMMERCIAL GROSS FLOOR AREA 20,254 SF
TOTAL GROSS FLOOR AREA OF SITE 68,385 SF
RESIDENTIAL % OF GROSS FLOOR AREA 69%
PARKING STATISTICS
RESIDENTIAL PARKING SPACES
ATTACHED SINGLE FAMILY 6 UNITS 2 SPACES / UNIT* 12 (GARAGE) CONDOMINIUM UNITS 8 UNITS 2 SPACES / UNIT* 16 (CARPORT) SUBTOTAL 28* (14 FOR MIXED USE)
COMMERCIAL
PICKLEBALL CENTER 11,520 SF 2 SPACES / COURT 12
RETAIL 8,744 SF 1 SPACE / 260SF 34
SUBTOTAL 20,264 SF 48
COURTYARD 6,783 SF 1 SPACE / 1,040 SF 6.5
TOTAL PARKING REQUIRED 82.5 (68 FOR MIXED USE)
TOTAL PARKING PROVIDED 72
ATTACHMENT O
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA ENTITLEMENT
PACKAGE
INSPIRATION IMAGE BOARD - COMMERCIAL T2
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA ENTITLEMENT
PACKAGE
INSPIRATION IMAGE BOARD - RESIDENTIAL T3
EVENT ACCESS FOOD TRUCK
FOOD TRUCK TRASH TRASH
TRELLIS
TRASH TRASH TRASH TRASH
HIDDEN PINES WAY
RAILROAD AVE
CMU WALL PLASTER FINISH BUILDING 1 5,120 SQFT
COVERED
PATIO
PICKLE BALL COURTS
AREA - 11,520 SQFT CARPORTS COVERED PATIO BUILDING 5 BLDG AREA - 4,269 SQFT BUILDING 6 4,465 SQFT BUILDING 2 5,120 SQFT BUILDING 3 5,120 SQFT BUILDING 4 6,992 SQFT TENTATIVE TRACT MAP FOR TRACT 6044 HIDDEN PINES [] [] [] E E E
EVENT ACCESS FOOD TRUCK
FOOD TRUCK TRASH TRASH
TRELLIS
TRASH TRASH TRASH TRASH
HIDDEN PINES WAY
RAILROAD AVE
CMU WALL PLASTER FINISH BUILDING 1 5,120 SQFT
COVERED
PATIO
PICKLE BALL COURTS
AREA - 11,520 SQFT CARPORTS COVERED PATIO BUILDING 5 BLDG AREA - 4,269 SQFT BUILDING 6 4,465 SQFT BUILDING 2 5,120 SQFT BUILDING 3 5,120 SQFT BUILDING 4 6,992 SQFT PRELIMINARY GRADING PLAN for TRACT 6044 HIDDEN PINES [] [] [] E E E
S4
S5
S6
S3
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S5 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6 S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S5
S5
S5
S5
S5
S5
S5
S5
S5
S5
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S5
S5
S5
S5
S5
S5
S5
S5
S5
S5
S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4 S4
S4 S4 S4 S4 S4
S4 S4 S4 S4 S4
S4
S4
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S3 S4 S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S1
S3
S4
S4
S4 S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S1 S1 S1 S1 S1
S1
S1 S1 S1 S1 S1 S1 S1
S1
S1 S1 S1 S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1 S1 S1 S1
S1
S1
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S3
S4
S4
S4
S4
S4
S4
S4
S4 S4 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3 S4
S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3 S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
S4 S4 S4 S4
S4 S4 S4
S4 S4 S4 S4
S4 S4 S4
S4 S4 S4 S4
S4 S4 S4
S4 S4 S4 S4
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2 S1 S1 S1 S1 S1
S1
S1 S1 S1 S1 S1 S1 S1
S1 S1
S2
S4
S4
S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4
S4
S4
S4 S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3 S3 S3 S3
S3 S3
S3 S3
S3
S3
S3
S3
S3
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S2
S2
S2
S2
S2
S2
S2
S4
S4
S4 S4
S4 S4
S4 S4
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4 S4
S3 S3 S3 S3 S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3 S3 S3 S3 S3
S3 S3 S3 S3 S3 S3 S3 S3
S3 S3 S3 S3 S3 S3 S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3 S3 S3
S3 S3 S3 S3 S3 S3 S3 S3 S3
S5 S5 S5 S5
S5 S5 S5 S5
S5 S5 S5 S5 S5 S5 S5 S5
S5
S1
S1 S1 S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1 S1 S1 S1
S1
S3
S3
S3
S4
S4
SHEET NO.
DATE
OWNER
SHEET TITLE
PLEIN
DESIGN GROUP
IRE
3203 Lightning St., Ste. 201 // Santa Maria, CA 93455
805.349.9695 // www.pleinairedg.com
L-01
CONCEPTUAL
LANDSCAPE
PLAN
CONCEPTUAL LANDSCAPE PLAN
0 20 40 80
SCALE : 1" = 40'-0" NORTH COURTYARD AT HIDDEN PINES
22429
Dan Patin
26562 Shane Drive
Lake Forest, California 92630 2415 NORTH RAILROAD AVENUE // SANTA MARIA, CALIFORNIA 93458 2025.08.25
NORTH
N.T.S.
SITE
VICINITY MAP
Atlantic Pl.
Hidden Pines Way N Railroad Ave. Preisker Ln. Broadway
U.S. - 101 N Blosser Rd.
1. MINIMUM PLANT SIZES:
STREET TREES (24"BOX), SITE TREES (15 GAL.), SHRUBS (1 GAL.), GROUNDCOVER (FLATS)
2. IRRIGATION SYSTEM TO BE INSTALLED AS A PART OF SITE CONSTRUCTION. SYSTEM SHALL BE UNDERGROUND, AUTOMATIC WITH POP-UP SPRAY HEADS, "SMART" CONTROLLER AND AUTOMATIC RAIN SHUTOFF. LOW PRECIPITATION RATE HEADS TO BE USED TO MINIMIZE RUNOFF.
3. POINT OF CONNECTION FOR WATER SUPPLY, SHALL BE BY A NEW LANDSCAPE SUB METER.
4. ALL PLANTING AREAS SHALL RECEIVE A 3" LAYER OF MEDIUM BARK MULCH AFTER INSTALLATION.
5. ALL PLANT MATERIAL SHALL CONFORM TO THE CITY OF SANTA MARIA OR STATE OF CALIFORNIA MODEL WATER CONSERVATION ORDINANCE.
6. ALL PLANTING AND IRRIGATION SHALL BE INSTALLED PER THE CITY OF SANTA MARIA STANDARDS AND CODES.
7. FOR SITE WORK, ARCHITECTURAL, AND GRADING/DRAINAGE INFORMATION SEE PLANS BY OTHERS.
8. ALL AREAS BEYOND THE AREA OF WORK THAT ARE DISTURBED BY CONSTRUCTION SHALL BE RETURNED TO ORIGINAL CONDITION.
9. DRAWINGS ARE FOR DESIGN AND REVIEW PURPOSES ONLY AND SHALL NOT BE USED AS CONSTRUCTION DOCUMENTS.
10. TREES PLANTED IN AN AREA LESS THAN 8' WIDE SHALL BE INSTALLED WITH A LINEAR ROOT BARRIER TO PROTECT AGAINST HARDSCAPE DAMAGE.
11. STREET TREES ARE TO BE SELECTED FROM THE CITY OF SANTA MARIA APPROVED TREE LIST.
GENERAL NOTES
CONCEPTUAL PLANTING LEGEND
FLOWERING ACCENT TREES
CANOPY TREES
Natchez Crape Myrtle - Lagerstroemia indica 'Natchez'
Western Redbud - Cercis occidentalis
Chinese Elm - Ulmus Parvifolia
Green Vase Zelkova - Zelkova serrata 'Green Vase'
STREET TREES
Chinese Pistache - Pistacia chinensis
Thornless Honey Locust - Gleditsia triacanthos inermis
PERIMETER SCREENING TREES
Canary Island Date Palm - Phoenix canariensis
King Palm - Archontophoenix cunninghamiana
MEDIUM FLOWERING SHRUBS
Dwarf Yedda Hawthorn - Rhaphiolepis umbellata 'Minor'
Fortnight Lily - Dietes bicolor
Snow White New Zealand Tea Tree - Leptospermum s. 'Snow White'
SMALL FLOWERING SHRUBS
Hidcote English Lavender - Lavandula angistifolia 'Hidcote' Cassa Blue Flax Lily - Dianella caerulea 'Cassa Blue'
Blue Chalksticks - Senecio serpens
ORNAMENTAL GRASSES
Dwarf Mat Rush - Lomandra longifolia 'Breeze'
Blonde Ambition Blue Grama - Bouteloa gracilis 'Blonde Ambition' Karl Foerster Reed Grass - Calamagrostis x acutiflora 'Karl Foerster'
SMALL ORNAMENTAL GRASSES
Berkeley Sedge - Carex divulsa
Autumn Moor Grass - Sesleria Autumnalis
Siskiyou Blue Fescue - Fetuca 'Siskiyou Blue'
MEDIUM SHADE SHRUBS
Giant Lily Turf - Liriope gigantea
Foxtail Fern - Asparagus densiflorus 'Myers Fern'
David Viburnum - Viburnum davidii
SMALL SHADE SHRUBS
Lily Turf - Liriope muscari
Variegated Flax Lily - Dianella T. 'Variegata'
Berkeley Sedge - Carex divulsa
L.I.D. PLANTING
Berkeley Sedge - Carex divulsa
Yarrow - Achillea millefolium
Elk Blue California Gray Rush - Juncus p. 'Blue Elk'
FLOWERING GROUNDCOVERS
Creeping Myoporum - Myoporum p. 'Putah Creek'
Bearberry Cotoneaster - Cotoneaster d.'Low Fast'
Trailing Rosemary - Rosmarinus o. 'Prostratus'
FLOWERING VINE
Lavender Star Flower - Grewia occidentalis
CLINGING VINE
Creeping Fig - Ficus Pumila
Boston Ivy - Parthenocissus tricuspidata
CONTAINER PLANTS
Sweet Alyssum - Lobularia maritima
Foxtail Fern - Asparagus densiflorus 'Myers Fern'
Sweet Shade - Hymenosporum flavum
Mediterranean Fan Palm - Chamaerops humilis
Yellow Lady Banks Rose - Rosa bansiae 'Lutea'
2 1
4 5
6 3
7 TURF
SEED OR SOD
PALM TREES
Brisbane Box - Lophostemon confertus
Sweetshade - Hymenosporum flavum
HIDDEN PINES WAY NORTH RAILROAD AVE
EXISTING RESIDENTIAL ZONE
NOT A PART EXISTING RESIDENTIAL ZONE NOT A PART
35' SITE TRIANGLE (TYP.)
DECORATIVE ELEMENT
DECORATIVE WALL
CITY STREET TREES
CITY STANDARD
TRASH
ENCLOSURES
SITE ENLARGEMENT
REFER TO L-02 \\pleinaire420\Pleinaire Shared\Drawing File\Urban Planning Concepts\Courtyard at Hidden Pines\Landscape\Conceptual\CLP.dwg S1
S1
S1
S1
S1
S1
S1
S1
S1
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S6
S5
S5
S5
S5
S5
S5
S5
S5
S5
S4 S4
S4 S4
S1
S3
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S1 S1 S1 S1 S1
S1
S1 S1 S1 S1 S1 S1 S1
S1
S1 S1 S1 S1
S1
S1
S1
S4
S4
S4
S4
S4
S4
S4
S4
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S2
S4
S4
S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4
S4
S4
S4 S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4 S4
S4
S4
S4
S4
S4
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3 S3 S3
S3
S3 S3
S3
S3
S3
S3
S3
S3
S3
S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4 S4
S4
S4 S4
S4 S4
S4 S4
S3
S3
S3
S3
S3
S3
S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4 S4
S4 S4
S3 S3 S3 S3 S3
S3
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S4
S3 S3 S3 S3 S3
S3 S3 S3 S3 S3 S3 S3 S3
S3 S3 S3 S3 S3 S3 S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3
S3 S3 S3
S3 S3 S3 S3 S3 S3 S3 S3 S3
S1
S1 S1 S1
S1
S1
S1
S1
S1
S3
S3
S3
S4
SHEET NO.
DATE
OWNER
SHEET TITLE
PLEIN
DESIGN GROUP
IRE
3203 Lightning St., Ste. 201 // Santa Maria, CA 93455
805.349.9695 // www.pleinairedg.com
L-02
CONCEPTUAL
LANDSCAPE
ENLARGEMENT COURTYARD AT HIDDEN PINES
22429
Dan Patin
26562 Shane Drive
Lake Forest, California 92630 2415 NORTH RAILROAD AVENUE // SANTA MARIA, CALIFORNIA 93458 2025.08.25
NORTH
N.T.S.
SITE
VICINITY MAP
Atlantic Pl.
Hidden Pines Way N Railroad Ave. Preisker Ln. Broadway
U.S. - 101 N Blosser Rd.
CONCEPTUAL LANDSCAPE ENLARGEMENT - PLAZA
0 5 10 20
SCALE : 1" = 10'-0" NORTH
HIDDEN PINES WAY NORTH RAILROAD AVE
DECORATIVE ELEMENT
DECORATIVE WALL
CITY STREET TREES
TREES WITHIN TREE WELL
VEHICLE ENTRY INTO PLAZA
CITY STREET TREE EASEMENT
RAISED PLANTER
DECORATIVE PAVING \\pleinaire420\Pleinaire Shared\Drawing File\Urban Planning Concepts\Courtyard at Hidden Pines\Landscape\Conceptual\CLP.dwg SHEET NO.
DATE
OWNER
SHEET TITLE PLEIN
DESIGN GROUP
IRE
3203 Lightning St., Ste. 201 // Santa Maria, CA 93455
805.349.9695 // www.pleinairedg.com
L-03
PLANT
IMAGERYCOURTYARD AT HIDDEN PINES
22429
Dan Patin
26562 Shane Drive
Lake Forest, California 92630 2415 NORTH RAILROAD AVENUE // SANTA MARIA, CALIFORNIA 93458 2025.08.25
NOTE:
PLANT IMAGERY SHOWN
IS REPRESENTATIVE OF A
DESIGN CONCEPT ONLY.
FINAL SELECTIONS MAY
VARY. SEE CONCEPTUAL
PLANTING LEGEND FOR
MORE INFORMATION.
Natchez Crape Myrtle Green Vase Zelkova Sweet Shade Brisbane Box Amazing Red Dwarf Coast Rosemary Little John SB Mexican Bush Sage Hot Lips Sage Lily of the Nile Walker's Low Daylily Fortnight Lily Hidcote Lavender Berkeley Sedge Canyon Prince Wild Rye Deer Grass Lomandra Breeze Elijah Blue Fescue Elk Blue Juncus Yarrow Cape Rush Trailing Lantana Creeping Myoporum Boston Ivy Creeping Fig Lavender Star Flower TREES SHRUBS SHRUBS ORNAMENTAL GRASSES L.I.D. GROUNDCOVERS VINES ORNAMENTAL GRASSES Chinese Pistache Canary Island Date Palm \\pleinaire420\Pleinaire Shared\Drawing File\Urban Planning Concepts\Courtyard at Hidden Pines\Landscape\Conceptual\CLP.dwg 04/29/2025
PARKING REQUIREMENTS
COMMERCIAL
(MARKET, FOOD & BEVERAGE SALES)
• (1) SPACE / 260 SQFT
RESIDENTIAL
DUPLEX
(2) SPACES PER UNIT = 12
4,305 SQFT / 260 = 17 SPACES
(8) STACKED FLATS
(2) COVERED SPACES PER UNIT + 4 GUEST SPACES = 20
1 EVENT
ACCESS
FOOD TRUCK
FOOD TRUCK
64' - 8" 53' - 8" 53' - 8" 53' - 8" 53' - 8" 65' - 3"
24' - 0"
R 55' - 0"
R 38' - 0"
1 24
PARKING PROVIDED 72
PARKING REQUIRED 69
25' - 8" 25' - 8"
7' - 5"
7' - 11"
PICKLE BALL COURT / FITNESS STUDIO NOT SPECIFICALLY
DEFINED, THE PARKING REQUIREMENTS SHALL BE
DETERMINED BY THE ZONING ADMINISTRATOR AND BASED
UPON THE REQUIREMENT FOR THE MOST COMPARABLE USE
NET FITNESS AREA 2,150 SQFT / 260 = 8 SPACES
PICKLE BALL / (2 SPACES PER COURT)
12 SPACES PROPOSED
PICNIC
AREA
MAIL KIOSK
TRASH TRASH TRASH TRASH
HIDDEN PINES WAY
RAILROAD AVE
16' - 0"
26' - 0"
12' - 0"
COVERED
PATIO
PUE / TREE EASEMENT
14' - 0"
24' - 8"
16 1
13 1
7 26' - 0"
11' - 6"
24' - 0"
13' - 0" 10' - 6"
TREE EASEMENT
14' - 0"
25' - 0"
16' - 7" 48' - 8" 48' - 8"
5' - 0" 5' - 0"
48' - 8" 48' - 8"
5' - 0" 5' - 0"
48' - 8" 48' - 8"
100' - 0" 269' - 6"
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
BLDG 4
BLDG 5
BLDG 6
2415 N. Railroad Avenue SCHEMATIC FLOOR PLA
2415 N. Railroad Avenue
APN 117-930-014
2.80 Acre site
CURRENT ZONE PD/PF
SCALE: 1" = 30'-0" 2
SCHEMATIC SITE PLAN
Occupancy Load
ROOM NAME AREA
LOAD
FACTOR
O
L
FITNESS STUDIO 1488 SF 50 15
CHECK IN 442 SF 50 4.5
TABLE 422.1
MINIMUM PLUMBING
WC 2
URINAL 2
LAVITORY 2
DRINKING FOUNTAIN 1
SERVICE SINK 1
MA
TABLE 4-1
OCCUPANT LOAD FACTOR
EXERCISE 50
BUSINESS 150
MERCANTILE 100
PICKLE BALL 10 PER COURT
Accessory areas such as, but not limited to,
hallways/corridors, stairways, ramps, toilet rooms,
mechanical rooms, closets and fixed equipment,
may be excluded.
BAKERY
PRODUCE
ICE CREAM
CAFE
1000 SF
1000 SF
1000 SF
1000 SF
100
100
100
100
PICKLEBALL 6 COURTS 10/COURT
TOTAL OCCUPANT LOAD
5 5
5 5
30 70.
MF
A3
M
WC
URINAL
LAVITORY
1 2
1 0
1 1
M
M
M
M
A3
1 1
1 A3
A3
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA ENTITLEMENT
PACKAGE
ARCHITECTURAL SITE PLAN A0
LEGEND
INTERNET CAFE / SERVICE AREA FOR PICKLE BALL COURTS
FITNESS, PICKLEBALL COURTS AND SHARED RESTROOMS
UNITS 1-8. RESIDENTIAL 2 BEDROOM CONDOMINIUM UNITS
ATTACHED SINGLE FAMILY DWELLING UNITS
PEDESTRIAN PLAZA 6,783 SQFT
RAISED PLANTER & PROJECT ART LOCATION
FUTURE PV SOLAR COVERED PARKING
200 SQFT OF PRIVATE OPEN SPACE FOR CONDO UNITS
MAIL KIOSK
TRASH ENCLOSURE
POP UP RETAIL /FARMERS MARKET STALLS
STREET CORNER IMPROVEMENTS
STREET PARKING 11 SPACES
DECORATIVE PAVING
TEMPORARY VEHICLE ACCESS FOR EVENT STAGING
CMU BLOCK WALL TO MATCH EXISTING ALONG HIDDEN PINES
RESIDENTIAL WOOD PRIVACY FENCE / GATE TO TRASH BIN STORAGE 8’X8’ TREE WELL WITH METAL GR
RESIDENTIAL PRIVACY WOOD FENCING PER LANDSCAPE PLANS
BIKE PARKING
1 2
1 2
1 3
3 4
4 5
5 18
20 20
20 12
13 14
14 13
6 6
7 7 8
8 15
9 9
10 10
11 12
13 16
14 17
15 18
19 20
11 13
4 4
16 19
17 04/29/2025
UP
DINING
11'x13'
LIVING
18'x18'
OFFICE
11'-6"x10'-3"
ENTRY
6'-6x7'-6"
KITCHEN
12'x17'-8"
BATH
10'x8'
CLOSET 6'x9'
PRIMARY BED 15'x14'-8"
BED 2
10'-6"x11'-9"
BED 3
10'-6"x11'-9"
LAUNDRY 6'x9'
2 CAR GARAGE 22'x20'
PWDR
3'x9
52' - 6"
COV. PORCH
2' - 0" 6' - 0" 9' - 0" 6' - 0"
COV.
PORCH
REAR YARD
DRIVEWAY DRIVEWAY
OFFICE
LIVING
KITCHEN KITCHEN
ENTRY
PRIMARY PRIMARY PRIMARY PRIMARY
BED
PRIMARY PRIMARY
BATH
BED 2
BATH
BED 3
REAR YARD
2 CAR GARAGE
27' - 6" 21' - 0" 4" 21' - 0" 27' - 6"
97' - 4"
48' - 6" 48' - 10"
2' - 0" 23' - 0" 25' - 6" 4" 25' - 6" 21' - 0"
97' - 4"
PRIMARY BATH
2' - 0"
5' - 3" 2' - 6" 7' - 3" 2' - 6" 8' - 0"
4"
8' - 0" 2' - 6" 7' - 3" 2' - 6" 5' - 3"
3' - 6"
7' - 2" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 7' - 6" 12' - 5" 10' - 0" 24' - 6"
1 7' - 7" 21' - 1" 14' - 11" 11' - 1"
96' - 2"
BED 2
BED 1
STORAGE
STORAGE
BATH 2
BATH 1
LIVING
DINING
KITCHEN
PRIVATE PATIO
BED 2
BATH 1
BED 1
BED 3 BATH 2
W.I.C.
PRIVATE PATIO
LAUNDRY
LAUNDRY
LIVING DINING
KITCHEN
3' - 0" 7' - 6" 1' - 6" 27' - 0" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 11' - 10" 3' - 0"
95' - 2"
74' - 0" 1' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue SCHEM
SANTA MARIA, CALIFORNIA
SCALE: 1/8" = 1'-0" 1
SCHEMATIC FLOOR PLAN
SCALE: 1/8" = 1'-0" 2
SCHEMATIC GROUND FL
LIVING AREA: 2,088 SQFT
GARAGE AREA: 472 SQFT
LIV
LIV
PRIVATE O
STORAGE SPAC
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A1
ENTITLEMENT
PACKAGE
BUILDING 1-3 FLOOR PLAN
04/29/2025
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
FLOOR
- 0"
.P 1
- 1"
.P..
5' - 0"
MASSING BLDG. 1-3 A5
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 3
EAST
SCALE: 1/8" = 1'-0" 12
NORTH
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue
SANTA MARIA, CALIFORNIA
SCALE: 1/8" = 1'-0" 13
SOUTH
SCALE: 1/8" = 1'-0" 14
WEST
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A2
ENTITLEMENT
PACKAGE
BUILDING 1-3 ELEVATIONS
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
MASSING BLDG. 1-3 A5
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 3
EAST
SCALE: 1/8" = 1'-0" 12
NORTH
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue
SANTA MARIA, CALIFORNIA
SCALE: 1/8" = 1'-0" 13
SOUTH
SCALE: 1/8" = 1'-0" 14 EAST (FRONT) WEST
SCALE: 1/8” = 1’-0”
1 3
2 4 NORTH (RIGHT)
SCALE: 1/8” = 1’-0”
WEST (REAR)
SCALE: 1/8” = 1’-0”
SOUTH (LEFT)
SCALE: 1/8” = 1’-0”
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A3
ENTITLEMENT
PACKAGE
BUILDING 1-3 COLORS & MATERIALS BOARD
PLASTER FINISH WALLS
SMOOTH STUCCO EXTERIOR WALLS -
MERLEX STUCCO
ROOF FINISH
SCHEME 2
CLASSIC ‘S’ CONCRETE ROOF TILES -
EAGLE ROOFING PRODUCTS - CAPISTRANO PROFILE
WOOD ACCENTS
FRONT DOOR, CORBELS & OUTLOOKERS
NATURAL DARK WOOD TONE
METAL ACCENTS
COLOR - BLACK OR SIMILAR
DECO. ACCENT
BARRON DESIGNS OR SIMILAR
FAUX WOOD, POLYURETHANE FINISH
COLOR: CARAMEL
CORBELS, RAFTERS TAILS,
BRACES, OUTLOOKERS
DECO. GRILLE
VAN DYKE’S RESTORERS OR SIMILAR -
BLACK POWDER COAT GRILL
DECO VENT
SUNCOAST STONE INC.
OR SIMILAR
CLAY GABLE VENT TUBE
EXT. LIGHTING
BLACK FINISH - MATCH SIMILAR
SPANISH REVIVAL STYLE
AWNINGS
CLASSIC ‘S’ CONCRETE ROOF TILE AWNING
NATURAL DARK WOOD FRAME
FRONT DOOR
CONTEMPORARY STYLE - WOOD DOOR
SCHEME 1:
EL DORADO, P-6 SCHEME 1:
SANTA BARBARA BLEND
DOORS/WINDOWS
EXT. WINDOWS AND DOORS
BLACK FRAME - VINYL OR FIBERGLASS
WINDOW GRIDS AS SHOWN.
10 6 1 2 3 4 11 8 10 7 9 5
3 4 5 6
2 11
9 1
7 10
8 SCHEME 2:
BISQUE, P-141
SCHEME 3:
CRYSTAL WHITE, X-50
3 3
4 4
SCHEME 2:
SUNRISE BLEND
SCHEME 3:
TUSCAN BLEND
04/29/2025
UP
BED 2
12'x12'
BATH 1
11'x5'-6"
BED 1
11'-6"x10'-6"
LIVING
14'x13'-6"
LIVING
14'x14'
BED 1
14'x13'
BATH 1
10'-6"x7'-6"
BED 2
11'-6"x11'-6"
BED 3
10'-6"x11 BATH 2
5'-4"x13'
STORAGE 6'x6'
LAUNDRY 6'x3'
BATH 2
11'-5"x7'-5"
KITCHEN 6'x17'
DINING
10'x10'
DINING
KITCHEN 7'x14'
PRIVATE PATIO 200 SF
PRIVATE PATIO
200 SF
7' - 2" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 7' - 6" 12' - 5" 10' - 0" 12' - 5" 7' - 6" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 7' - 0" ENTRY
10'x7'
27' - 0" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 11' - 10" 24' - 6"
74' - 0"
1' - 0"
11' - 1" 14' - 11" 21' - 1" 7' - 7"
1' - 0"
7' - 7" 21' - 1" 14' - 11" 11' - 1"
STORAGE 6'-6"x6'
3' - 0" 9' - 0"
LAUNDRY 6'x3'
96' - 2"
W.I.C.
7'x8'-6"
BED 2
BED 1
STORAGE
STORAGE
BATH 2
BATH 1
LIVING
DINING
KITCHEN
PRIVATE PATIO
BED 2
BATH 1
BED 1
BED 3 BATH 2
W.I.C.
PRIVATE PATIO
LAUNDRY
LAUNDRY
LIVING DINING
KITCHEN
3' - 0" 7' - 6" 1' - 6" 27' - 0" 3' - 0" 7' - 7" 2' - 0" 7' - 7" 3' - 0" 11' - 10" 3' - 0"
95' - 2"
74' - 0" 1' - 0"
SCHEMATIC FLOOR PLANS A2
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 2
SCHEMATIC GROUND FLOOR PLAN
LIVING AREA UNIT 1 : 1,164 SQFT
LIVING AREA UNIT 2 : 1,333 SQFT
PRIVATE OPEN SPACE : 200 SQFT / UNIT
STORAGE SPACE : 300 CUBIC FEET MIN / UNIT
DN
7' - 2" 23' - 2" 7' - 6" 12' - 5" 10' - 0" 12' - 5" 7' - 6" 23' - 2" 7' - 0" 27' - 0" 23' - 2" 11' - 10"
24' - 6" 8' - 1"
74' - 0"
1' - 0"
11' - 1" 14' - 11" 21' - 1" 7' - 7"
1' - 0"
7' - 7" 21' - 1" 14' - 11" 11' - 1"
12' - 0"
96' - 2"
12' - 0" 27' - 0" 23' - 2" 11' - 10"
95' - 2"
74' - 0" 1' - 0"
BED 2
8'x47
BATH 1
8'x48
BED 1
8'x49
LIVING
8'x50
LAUNDRY 8'x51
BATH 2
8'x52
LIVING
8'x50
LIVING
8'x50
DECK
8'x55
LIVING
8'x50
STORAGE 8'x57
BED 2
BED 1
BATH 2
BATH 1
LIVING
LIVING
LIVING
DECK
LAUNDRY
STORAGE
LIVING
8'x81
BED 1
8'x82
BATH 1
8'x83
BED 2
8'x84
BED 3
8'x85 BATH 2
8'x86
STORAGE 8'x87
LIVING
8'x81
DECK
8'x90
LAUNDRY 8'x91
W.I.C.
8'x92
BED 2
BATH 1
BED 1
BED 3 BATH 2
W.I.C.
DECK
LAUNDRY
LIVING LIVING
LIVING
DECK
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue SCHEMA
SANTA MARIA, CALIFORNIA
SCALE: 1/8" = 1'-0" 1
SCHEMATIC 2ND LEVEL FLOOR PLAN
LIVING AREA UNIT 1 : 1,164 SQFT
LIVING AREA UNIT 2 : 1,333 SQFT
PRIVATE DECK : 200 SQFT / UNIT
STORAGE SPACE : 300 CUBIC FEET MIN / UNIT
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A4
ENTITLEMENT
PACKAGE
BUILDING 4 FLOOR PLAN
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A5
ENTITLEMENT
PACKAGE
BUILDING 4 ELEVATIONS
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 4 A6
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
EAST
SCALE: 1/8" = 1'-0" 2
NORTH
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
T LIMIT
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
SCALE: 1/8" = 1'-0" 2
NORTH
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 4 A6
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
EAST
SCALE: 1/8" = 1'-0" 2
NORTH
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
9' - 1" 1' - 2" 9' - 1"
FIN FLOOR
+0' - 0"
T.O.P 1
+9' - 1"
Level 2
+10' - 3"
T.O.P 2
+19' - 4"
MAX HEIGHT LIMIT
+30' - 0"
9' - 1" 1' - 2" 9' - 1"
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue
SANTA MARIA, CALIFORNIA
SCALE: 1/8" = 1'-0" 1
EAST
SCALE: 1/8" = 1'-0" 3
SOUTH
EAST (REAR)
SCALE: 1/8” = 1’-0”
NORTH (LEFT)
SCALE: 1/8” = 1’-0”
WEST (FRONT)
SCALE: 1/8” = 1’-0”
SOUTH (RIGHT)
SCALE: 1/8” = 1’-0”
1 3
2 4
04/29/2025
DECO. GRILLE
VAN DYKE’S RESTORERS OR SIMILAR -
BLACK POWDER COAT GRILL
SCHEME 1:
EL DORADO, P-6 SCHEME 1:
SANTA BARBARA BLEND
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A6
ENTITLEMENT
PACKAGE
FRONT DOOR: CONTEMPORARY STYLE - WOOD COMPOSITE DOOR
SIDE DOOR: CONTEMPORARY STYLE - WOOD COMPOSITE FRENCH DOOR BUILDING 4 COLORS & MATERIALS BOARD
PLASTER FINISH WALLS
CANVAS AWNINGS
SMOOTH STUCCO EXTERIOR WALLS -
MERLEX STUCCO
CANVAS AWNING WITH ORNAMENTAL WROUGHT-IRON BRACKETS
COLOR: CANVAS BLACK
ROOF FINISH
CLASSIC ‘S’ CONCRETE ROOF TILES -
EAGLE ROOFING PRODUCTS - CAPISTRANO PROFILE
WOOD ACCENTS
FRONT DOOR, CORBELS & OUTLOOKERS
NATURAL DARK WOOD TONE
METAL ACCENTS
COLOR - BLACK OR SIMILAR
DECO. ACCENT
BARRON DESIGNS OR SIMILAR
FAUX WOOD, POLYURETHANE FINISH
COLOR: CARAMEL
CORBELS, RAFTERS TAILS,
BRACES, OUTLOOKERS
RAILING
SHUTTERS
TILE WAINSCOT
ORNAMENTAL WROUGHT-IRON BALUSTERS
FIXED LOUVER SHUTTERS
COLOR: GEORGIAN BAY, 6509
DECORATIVE SPANISH TILE
EXT. LIGHTING
BLACK FINISH - MATCH SIMILAR
SPANISH REVIVAL STYLE
TRELLIS
SIGNAGE
WOODEN VERTICAL POSTS AND CROSS BEAMS
3-DIMENSIONAL METAL SIGNAGE
NATURAL DARK
WOOD TONE
DOORS
DOORS/WINDOWS
EXT. WINDOWS AND DOORS
BLACK FRAME - VINYL OR FIBERGLASS
WINDOW GRIDS AS SHOWN.
10 11 3 2 14 8 4 1 12 9 2 7 13 9 12 1 8 10 14 11
3 9
4 5 6
2 11
15 10
1 7
12 13
14 8
8 SCHEME 1
04/29/2025
COV.
PATIO
UTILITY
JANITOR
RR 1
LOCKER 1
LOCKER 2
RR 2
STORAGE
LOUNGE / CAFE
CHECK IN
ELECT. / FIRE RISER
PICKLE BALL
COURTS
10 15 7 7 15 10 10 10
8 10
7 10 10
7 10 10
8 15 7 7 15
TRELLIS COVERED
PATIO
WATER FOUNTAIN FEATURE
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue SCHEMATIC FLOOR PLANS A3
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
SCHEMATIC FLOOR PLAN
PICKLEBALL AREA: 11,520 SQFT
FITNESS STUDIO AREA: 4,269 SQFT
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A7
ENTITLEMENT
PACKAGE
BUILDING 5 FLOOR PLAN
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A8
ENTITLEMENT
PACKAGE
BUILDING 5 ELEVATIONS
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
metal awning over door
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P .
+23' - 0"
stucco recess with control
joint to match window grids
tile wainscott detail @
corners
stucco detail similar to
reference image
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
add canvas awning
over windows
T.O.P..
+15' - 0"
SCALE: 1/8" = 1'-0" 2
WEST
SCALE: 1/8" = 1'-0" 3
EAST
SCALE: 1/8" = 1'-0" 4
NORTH
SCALE: 1/8" = 1'-0" 5
SOUTH
metal awning over door
metal awning over door
WEST (REAR)
SCALE: 1/8” = 1’-0”
SOUTH (LEFT)
SCALE: 1/8” = 1’-0”
1 2
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A9
ENTITLEMENT
PACKAGE
BUILDING 5 ELEVATIONS
FIN FLOOR
+0' - 0"
metal awning over door
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
MAX HEIGHT
+30' - 0"
T.O.P .
+23' - 0"
stucco recess with control
joint to match window grids
tile wainscott detail @
corners
stucco detail similar to
reference image
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
add canvas awning
over windows
T.O.P..
+15' - 0"
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 5 A7
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 2
WEST
SCALE: 1/8" = 1'-0" 3
EAST
SCALE: 1/8" = 1'-0" 4
NORTH
SCALE: 1/8" = 1'-0" 5
SOUTH
metal awning over door
metal awning over door
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
metal awning over door
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
T.O.P..
+15' - 0"
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P .
+23' - 0"
stucco recess with control
joint to match window grids
tile wainscott detail @
corners
stucco detail similar to
reference image
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P .
+23' - 0"
T.O.P..
+15' - 0"
A. 93422 | o: 805.556.7997 | e: [email protected] d Avenue MASSING BLDG. 5 A7
NIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 4
NORTH
metal awning over door
metal awning over door
EAST (FRONT) - RAILROAD AVE. STREET VIEW
SCALE: 1/8” = 1’-0”
NORTH (RIGHT)
SCALE: 1/8” = 1’-0”
3 4
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A10
ENTITLEMENT
PACKAGE
BUILDING 5 COLORS & MATERIALS BOARD
DOORS/WINDOWS
EXT. WINDOWS AND DOORS
BLACK FRAME - VINYL OR FIBERGLASS
WINDOW GRIDS AS SHOWN.
7 PLASTER FINISH WALLS
SMOOTH STUCCO EXTERIOR WALLS -
MERLEX STUCCO
ROOF FINISH
CLASSIC ‘S’ CONCRETE ROOF TILES -
EAGLE ROOFING PRODUCTS - CAPISTRANO PROFILE
WOOD ACCENTS
FRONT DOOR, CORBELS & OUTLOOKERS
NATURAL DARK WOOD TONE
METAL ACCENTS
PRE-CAST COLUMNS & WAINSCOT
COLOR - BLACK OR SIMILAR
SMOOTH STUCCO PRE-CAST COLUMNS -
MERLEX STUCCO
SUSPENDED METAL AWNING; COLOR: BLACK
DECO. ACCENT
BARRON DESIGNS OR SIMILAR
FAUX WOOD, POLYURETHANE FINISH
COLOR: CARAMEL
CORBELS, RAFTERS TAILS,
BRACES, OUTLOOKERS
EXT. LIGHTING
BLACK FINISH - MATCH SIMILAR
SPANISH REVIVAL STYLE
SIGNAGE CONCEPTS
DIMENSIONAL METAL SIGNAGE
SCHEME 3:
CRYSTAL WHITE, X-50 AGATE,
P-505
1 2 4
8 9
5 6
1 2 3 5 10 6 9 11 10 7 10 5 3 3 11 9
11 10
TILE WAINSCOT
DECORATIVE SPANISH TILE
3 SCHEME 3:
TUSCAN BLEND
SCHEME 3
METAL AWNINGS
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A11
ENTITLEMENT
PACKAGE
BUILDING 6 FLOOR PLAN
URGENT CARE LEASE SPACE
2,500 SQFT
NET
1730 SQFT
NET
44' - 0" 3' - 0"
27' - 6" 28' - 0" 46' - 8"
102' - 2"
27' - 11" 55' - 1"
83' - 0"
47' - 0"
42' - 0"
14' - 3"
SCALE: 1/8" = 1'-0" 1
SCHEMATIC FLOOR PLAN
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A12
ENTITLEMENT
PACKAGE
BUILDING 6 ELEVATIONS
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGNAGE SIGNAGE SIGNAGE SIGNAGE
METAL AWNING OVER DOOR
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGN NAGE
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 6 A8
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
NORTH
SCALE: 1/8" = 1'-0" 2
EAST
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGNAGE SIGNAGE SIGNAGE SIGNAGE
METAL AWNING OVER DOOR
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGN NAGE
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 6 A8
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
NORTH
SCALE: 1/8" = 1'-0" 2
EAST
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGNAGE SIGNAGE SIGNAGE SIGNAGE
METAL AWNING OVER DOOR
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGN NAGE
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 6 A8
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
NORTH
SCALE: 1/8" = 1'-0" 2
EAST
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGNAGE SIGNAGE SIGNAGE SIGNAGE
METAL AWNING OVER DOOR
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
SIGN NAGE
FIN FLOOR
+0' - 0"
MAX HEIGHT LIMIT
+30' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
FIN FLOOR
+0' - 0"
T.O.P
+20' - 0"
T.O.P..
+15' - 0"
ESPALIER VINES TILE WAINSCOTT
5960 West Mall Suite B | Atascadero, CA. 93422 | o: 805.556.7997 | e: [email protected] 2415 N. Railroad Avenue MASSING BLDG. 6 A8
SANTA MARIA, CALIFORNIA
2024-05-2415
05.16.2024
SCALE: 1/8" = 1'-0" 1
NORTH
SCALE: 1/8" = 1'-0" 2
EAST
SCALE: 1/8" = 1'-0" 3
SOUTH
SCALE: 1/8" = 1'-0" 4
WEST
NORTH (REAR)
SCALE: 1/8” = 1’-0”
SOUTH (FRONT)
SCALE: 1/8” = 1’-0”
EAST (RIGHT)
SCALE: 1/8” = 1’-0”
WEST (LEFT)
SCALE: 1/8” = 1’-0”
1 2
3 4
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A13
ENTITLEMENT
PACKAGE
BUILDING 6 COLORS & MATERIALS BOARD
1 2 6 3 12 8 5 13 13 9 7 8 2 5 9 3
METAL AWNINGS CANVAS AWNINGS
CANVAS AWNING WITH ORNAMENTAL
WROUGHT-IRON BRACKETS; COLOR: BLACK
DOORS/WINDOWS
EXT. WINDOWS AND DOORS
BLACK FRAME - VINYL OR FIBERGLASS
WINDOW GRIDS AS SHOWN.
9 PLASTER FINISH WALLS
SMOOTH STUCCO EXTERIOR WALLS -
MERLEX STUCCO
ROOF FINISH
CLASSIC ‘S’ CONCRETE ROOF TILES -
EAGLE ROOFING PRODUCTS - CAPISTRANO PROFILE
WOOD ACCENTS
FRONT DOOR, CORBELS & OUTLOOKERS
NATURAL DARK WOOD TONE
METAL ACCENTS
FINIAL
COLOR - BLACK OR SIMILAR
METAL ROOFTOP ACCENT FINIAL
SUSPENDED METAL AWNING; COLOR: BLACK
DECO. ACCENT
BARRON DESIGNS OR SIMILAR
FAUX WOOD, POLYURETHANE FINISH
COLOR: CARAMEL
CORBELS, RAFTERS TAILS,
BRACES, OUTLOOKERS
EXT. LIGHTING
BLACK FINISH - MATCH SIMILAR
SPANISH REVIVAL STYLE
SIGNAGE CONCEPTS
DIMENSIONAL METAL SIGNAGE
SCHEME 3:
CRYSTAL WHITE, X-50
1 2 4
10 5
7 8 12 13
6 TILE WAINSCOT
DECORATIVE SPANISH TILE
3 SCHEME 3:
TUSCAN BLEND
SCHEME 3
DECO. GRILLE
VAN DYKE’S RESTORERS OR SIMILAR -
BLACK POWDER COAT GRILL
11 04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A14
ENTITLEMENT
PACKAGE
BIRD’S EYE VIEWS
04/29/2025
COURTYARD AT HIDDEN PINES
2 4 1 5 N . R A I L R O A D AV E N U E - SANTA MARIA, CA A15
ENTITLEMENT
PACKAGE
COURTYARD VIEW
COUNCIL AGENDA REPORT
TO: Mayor and City Council
FROM: Shad S. Springer, Director of Utilities
DATE: November 17, 2026
SUBJECT: Adoption of Resolutions Related to Environmental Review of Santa Maria Wastewater Treatment Plant Improvements Project, Wastewater Treatment Plant Master Plan, and Project Financing
Description:
The City Council will consider adopting Resolutions related to environmental documents for the Santa Maria Wastewater Treatment Plant Improvements Project, the Wastewater Treatment Plant Master Plan, authorizing the submission of a State Revolving Funding application for the Percolation Pond Expansion Project, and declaring the City’s intent to reimburse expenditures from future financing proceeds.
Environmental Notice: Environmental Review for this project was completed through the preparation of an Initial Study/Mitigated Negative Declaration (SCH #2026070802) pursuant to the California Environmental Quality Act State Guidelines.
RECOMMENDATION:
1. Adopt a Resolution to adopt an Initial Study/Mitigated Negative Declaration for the Santa Maria Wastewater Treatment Plant Improvements Project;
2. Adopt a Resolution adopting the Wastewater Treatment Plant Master Plan;
3. Authorize the Director of Utilities or designee to make administrative and technical revisions necessary to meet updated regulatory or programmatic requirements;
4. Adopt a Resolution authorizing an application for State Water Resources Control Board Financial Assistance for the Wastewater Treatment Plant Percolation Pond Expansion Project and designating an authorized representative;
5. Authorize the Director of Utilities or designee to act as the City's Authorized Representative for purposes of applying for and administering State Water Resources Control Board Clean Water State Revolving Fund financial assistance for the Wastewater Treatment Plant Percolation Pond Expansion Project; and
6. Adopt a Resolution declaring the City’s official intent to reimburse certain project expenditures from future State Water Resources Control Board Financing Proceeds.
EXECUTIVE SUMMARY:
The City's Wastewater Treatment Plant (WWTP) requires improvements to comply with wastewater discharge requirements, address aging infrastructure, and accommodate anticipated future demand. The City has developed a Wastewater Treatment Master Plan (Master Plan) to establish a long-term framework for these improvements, consistent with 2 the Time Schedule Order issued by the Central Coast Regional Water Quality Control Board (Water Board).
The Master Plan identifies a phased approach to improving the City's wastewater treatment and disposal system through approximately 2060. The first major project identified for implementation is the Percolation Pond Expansion Project, which adds six percolation ponds totaling approximately 42 acres adjacent to the existing WWTP on City-owned land east of Black Road.
The Percolation Pond Expansion Project is estimated to cost $55 million. Staff recommends pursuing up to $50 million in State Revolving Fund (SRF) financing, with the remaining estimated $5 million funded by the Wastewater Enterprise Fund. The SRF application must be submitted by December 31, 2026, with the State's fundable list anticipated in late spring 2027. Construction is tentatively anticipated to begin in 2028, subject to project readiness, regulatory requirements, procurement, and funding availability.
BACKGROUND:
Since 1932, the City has operated wastewater treatment and disposal facilities at the WWTP located at 601 Black Road, to serve the community’s residential, commercial, and industrial customers. The WWTP has undergone several expansions to accommodate community growth, most recently in 2008. The facility is permitted to treat 8.3 million gallons of wastewater per day and currently treats an average of approximately 6.2 million gallons per day. Although average wastewater flows remain below the WWTP's permitted treatment capacity, treatment capacity alone does not determine the system's ability to meet the community’s needs. Aging infrastructure, increasing wastewater strength, anticipated growth, limited disposal capacity, and more stringent discharge requirements necessitate improvements to the City's wastewater treatment and disposal system.
The Water Board issued more stringent wastewater discharge requirements for the WWTP based on General Order R3-2020-0020. The City's existing treatment process cannot meet the requirements, making improvements to the treatment process and disposal necessary.
On June 4, 2024, the City Council adopted Resolution 2024-78 authorizing and directing the submission of a Time Schedule Compliance Plan (TSCP) to the Water Board. The TSCP provided a pathway to compliance for the City’s WWTP with documented actions and timelines to be completed by the City. The Water Board accepted the City's TSCP and issued a Time Schedule Order (Order) on February 5, 2026 (Attachment E). The Order requires the City to comply with all wastewater discharge requirements no later than September 30, 2034, and to meet the milestones established in the Order. To date, the City has met all required milestones.
The next milestone that must be completed is the development and approval of a Master Plan (Attachment F). The Master Plan, prepared in coordination with Carollo Engineers, establishes a long-term framework for addressing wastewater treatment and disposal needs through approximately 2060, including phased improvements needed to support the City's wastewater system over that planning horizon.
3 DISCUSSION:
Staff requests that the City Council take four actions: (1) adopt the environmental document and associated California Environmental Quality Act (CEQA) findings for the Final Initial Study/Mitigated Negative Declaration and Mitigation Monitoring Program for the Santa Maria Wastewater Treatment Plant Improvements; (2) adopt the Master Plan; (3) authorize the City to pursue SRF financing; and (4) adopt a reimbursement resolution for the Percolation Pond Expansion Project.
These actions will complete the applicable environmental review action, advance the City's long-term wastewater planning (i.e., Master Plan), and allow staff to pursue financing for a near-term infrastructure priority identified in the Master Plan.
Time Schedule Order
The Order establishes a compliance deadline of September 30, 2034, and requires the City to meet specified milestones toward achieving compliance with wastewater discharge requirements. One of these milestones requires the City to submit an approved Master Plan by December 31, 2026. Adoption of the Master Plan satisfies this planning milestone and establishes the framework for implementing wastewater system improvements over time.
The City must also continue advancing individual projects through the applicable environmental review, design, financing, and approval processes to meet its obligations under the Order.
Wastewater Treatment Plant Master Plan
The need for a comprehensive planning effort reflects significant changes in the regulatory, operational, and infrastructure demands placed on the City's wastewater system. Since the last major planning effort in 1993, more stringent groundwater protection requirements, changes in wastewater characteristics, aging facilities, and projected community growth have created challenges that must be addressed to ensure the continued reliability and long-term sustainability of the WWTP.
Carollo Engineers prepared the City’s Wastewater Master Plan in coordination with City staff, establishing a 35-year roadmap to address wastewater facility needs, capital improvements, operational strategies, regulatory requirements, and anticipated growth. The nearly 3,000-page document reflects three years of testing, analysis, and study leading to an extensive technical evaluation of the City's WWTP and the improvements needed to support its long-term reliability.
The Master Plan evaluated alternatives for meeting the City’s needs, including various treatment options both at the existing facility and relocating the treatment plant to a new site.
Expanding and upgrading the existing facility was identified as the preferred long-term approach based on cost, operational efficiency, and ability to phase the upgrades with minimal disruption to plant activities.
4 The Master Plan also identified improvements to modernize treatment processes, replace or rehabilitate aging infrastructure, improve treated wastewater quality, provide additional capacity as the community grows, and improve energy efficiency and energy recovery.
Given the scale, cost, and complexity of the improvements identified, the City retained Black & Veatch Corporation to conduct an independent peer review of the draft plan. Black & Veatch’s evaluation affirmed that the Master Plan provides a sound framework for providing safe, reliable, and cost-effective wastewater treatment and disposal to meet the City’s current and future needs.
The magnitude of the anticipated capital improvements, currently estimated at $615 million for the Percolation Pond Expansion Project, WWTP Rehabilitation Projects, and the Phase 1 WWTP Upgrade, will require financing. Funding the entire program through the Wastewater Enterprise Fund on a pay-as-you-go basis would place too great a demand on ratepayers to pay the full costs over a short period of time. Financing provides an opportunity to distribute costs over time, allowing future users to contribute toward infrastructure improvements as they connect to the system.
To support the overall program delivery, the Master Plan identifies potential funding strategies, including subsidized financing through programs such as the SRF, the Water Infrastructure Finance and Innovation Act (WIFIA), potential bond issuance, and the City’s Growth Mitigation Fee program. The availability and suitability of these funding options will depend on project eligibility, financing terms, and the City's financial needs as individual projects advance.
Adoption of the Master Plan will not, by itself, approve or authorize funding for individual projects identified in the Master Plan. Projects will proceed through the applicable design, environmental review, funding, and approval processes, including City Council action on budget requests.
Under the proposed Resolution, the Director of Utilities or designee will be authorized to make administrative and technical revisions to the Master Plan necessary to reflect updated regulatory or programmatic requirements. Material changes to the Master Plan's overall scope, major project phases, or capital improvement strategy will return to the City Council for consideration.
Percolation Pond Expansion Project
The Percolation Pond Expansion Project is a near-term priority because existing disposal capacity limits the system's ability to dispose of treated wastewater and accommodate future needs. The project proposes constructing six new percolation ponds totaling approximately 42 acres on City-owned land east of Black Road. These will increase disposal capacity to accommodate growth and allow for significant rehabilitation of the existing ponds.
Project design is underway, including coordination with existing utilities, nearby infrastructure projects, operational needs, and site conditions. Based on the current schedule, bidding is anticipated in 2027, with construction beginning in 2028. This timeframe 5 is preliminary and depends on completion of design, funding, procurement, and coordination with existing site uses. Advancing the project will address an important disposal capacity constraint while allowing the City to continue planning and developing subsequent improvements identified in the Master Plan.
Percolation Pond Expansion Project Funding Strategy
The Percolation Pond Expansion Project represents a discrete, near-term investment within the City's broader wastewater improvement program. The project is estimated to cost approximately $55 million. Staff recommends pursuing up to $50 million in SRF financing, with the remaining estimated $5 million funded by the Wastewater Enterprise Fund.
The SRF program is a federal-state partnership that provides low-cost financing to communities for water quality infrastructure projects, such as the City’s WWTP. The interest rates for SRF financing are typically less than half of the market rate, subject to program eligibility and the terms ultimately negotiated. If favorable terms are available, this approach will help reduce financing costs for the project and benefit the City’s ratepayers.
Financing the percolation pond expansion separately also allows the City to evaluate the costs, scope, cash flow, and financing needs of subsequent improvements as those projects advance. This approach preserves financial flexibility and available enterprise funds for future phases while addressing the immediate need for additional disposal capacity.
SRF Financing and Reimbursement Resolution
The City, with support from Carollo Engineers, initiated the SRF application process for the Percolation Pond Expansion Project and is coordinating the various packages required for a complete application, including the General Information Package, the Technical Package, the Environmental Package, and the Financial Security Package. The application must be submitted by December 31, 2026, to be considered for the State's fundable list, which is anticipated to be issued in late spring 2027.
The proposed reimbursement resolution authorizes the City to reimburse eligible project expenditures from future financing proceeds in an amount not to exceed $50 million, subject to applicable requirements. Adoption of the resolution will not constitute approval of a loan, guarantee a funding award, or establish final financing terms. Authorizing the City to pursue SRF financing allows staff to advance the application while project design and supporting documentation are completed. Staff will return to City Council for action should the City be selected for SRF financing.
If SRF financing is not awarded or is insufficient to cover eligible project costs, staff will evaluate alternative financing options for City Council consideration.
Alternatives
The City Council may consider the following alternatives:
1. Defer adoption of the Master Plan or environmental document. Deferring these actions will delay project development and implementation. Furthermore, the City is obligated under the Order to submit an approved Master Plan by December 31, 2026. 6 2. Defer authorization to pursue SRF financing. Deferring this action will delay efforts to secure favorable financing for the Percolation Pond Expansion Project and affect the project schedule. This may also affect the City’s ability to meet milestones identified in the Order as SRF funding is only considered once per year.
Fiscal Considerations
The Percolation Pond Expansion Project is estimated to cost approximately $55 million. The proposed funding strategy is to pursue up to $50 million in SRF financing, with the remaining estimated $5 million funded by the Wastewater Enterprise Fund. The project's ultimate fiscal impact will depend on final project costs, eligible expenditures, funding availability, and approved financing terms.
SRF financing provides an opportunity for the City to receive more favorable borrowing terms compared with other financing options. Staff will return to the City Council for any additional approvals needed to accept financing or authorize project expenditures as applicable.
The Master Plan identifies a phased capital investment program extending through approximately 2060. Future improvements will require additional financial planning and evaluation of available funding sources to manage long-term costs and maintain reliable wastewater service. These will also be brought to the City Council for consideration as they are developed.
Environmental Review
Adoption of the Master Plan does not, by itself, constitute environmental approval of every future improvement identified in the Master Plan. Future projects will undergo analysis and may require additional environmental review.
The Santa Maria Wastewater Treatment Plant Improvements Project was evaluated in accordance with CEQA. A Final Initial Study/Mitigated Negative Declaration (IS/MND) (Attachment G) was prepared to evaluate the potential environmental impacts associated with the project. The environmental review identified potential environmental impacts that can be reduced to less-than-significant levels through project revisions and required mitigation measures. The mitigation measures are listed in Mitigation Monitoring and Reporting Program (MMRP), included as Table A of the IS/MND, and identify how required environmental protections will be implemented and monitored.
Staff provided notice of the City Council's environmental action to applicable public agencies and other recipients in accordance with CEQA requirements. Agencies that commented on the environmental document include the Santa Barbara County Air Pollution Control District and the California Department of Water Resources. Following approval, the City will file a Notice of Determination with the Santa Barbara County Clerk and the City’s Community Development Department will submit the required notice to the State Clearinghouse through CEQAnet.
7 Impact on Community
The City's wastewater treatment system is an essential public service that protects public health and supports residential and economic development. Collectively, the recommended actions will advance necessary infrastructure investments while supporting the long-term reliability and sustainability of Santa Maria's wastewater system.
ATTACHMENT(S)
A. Resolution – Environmental Review
B. Resolution – Wastewater Treatment Plant Master Plan
C. Resolution – Financial Assistance Application
D. Resolution – Reimbursement Project Expenditures
E. Time Schedule Order
F. Wastewater Treatment Plant Master Plan
G. Initial Study/Mitigated Negative Declaration (SCH #2026070802) Attachment A