CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-14
Facilities %
Alternative 4 - Bardenpho With
Primary Clarifiers and Digesters
Boiler Facility (New Boiler x1) $3,630,000
Gas Handling and Flare (New flare x2) $2,530,000
Electrical Building (New x1) $1,596,000
Cogeneration (New x1 engine, battery bank and
microgrid)
$6,772,000
Electrical, Instrumentation, and Controls (New) 20% $21,071,000 Difficulty of Construction Factor 10% $16,098,000
Total Direct Cost(5) $177,100,000
Contingency(1) 30% $53,130,000
General Conditions(2) 12.5% $28,779,000
General Contractor Overhead, Profit, and Risk(3) 15% $38,852,000 Sales Tax(4) 8.75% $10,073,000
Escalation to Midpoint (2034)(2) 3.7% $100,863,000
Total Estimated Base Construction Cost
(2034 $USD) (5)
$408,800,000
Design, CM, Admin, and Regulatory Compliance 31% $126,728,000 Total Estimated Project Cost (2034 $USD)(5) $536,000,000 Notes:
CM - construction management; USD - United States dollar (1) Contingency is calculated based on the Total Direct Cost. Note that numbers are rounded. (2) General Conditions and Escalation to Midpoint are both calculated based on Total Direct Cost + Contingency. (3) General Contractor Overhead, Profit, and Risk is calculated based on Total Direct Cost + Contingency + General Conditions.
(4) Sales taxes are based on 50 percent of the Total Direct Cost + Contingency. (5) Totals may not add up due to rounding.
5.5 Conclusions
Following the evaluation of siting options, the City selected the existing WWTP site for future facility expansion. This option provides long-term benefits by leveraging existing infrastructure and minimizing operational disruptions, staff travel, and capital costs. While the existing site poses challenges related to space constraints and construction sequencing, it remains the most practical and cost-effective choice.
Alternatives involving a greenfield site or a hybrid approach were found to introduce significant operational inefficiencies, increased infrastructure costs, and greater community impact.
Alternative 4, a 4-Stage Bardenpho process with primary clarification, was selected after comprehensive modeling and evaluation of multiple treatment configurations. This alternative was chosen for its ability to reliably meet the target TN concentration of 8 mg/L, which includes a safety margin below the permit limit of 10 mg/L. It also integrates well with existing plant infrastructure and supports long-term nutrient removal goals.
The recommended solids treatment approach under Alternative 4 includes gravity thickening for primary sludge and RDT for WAS, offering operational efficiency and flexibility. Anaerobic digestion is proposed to stabilize solids, followed by sludge storage to provide flexibility and consistent feed to the mechanical VOLUME 6 / CHAPTER 5: TREATMENT ALTERNATIVE SELECTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-15
dewatering process. The system includes provisions for cake storage or direct loading for off-site disposal, providing flexibility under variable hauling conditions. Together, these decisions support a robust, integrated solution that aligns with the City's long-term treatment objectives.
For budgeting and financial planning purposes, the Phase 1 technology replacement and expansion project has an estimated construction cost of $409 million. This cost includes a contingency of 30 percent and escalation to the midpoint of construction, currently estimated as 2034. The total project cost, including engineering, construction management, legal, regulatory, and other support requirements to provide a complete project, is estimated at $536 million (2034 dollars).
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-1
CHAPTER 6 PROJECT DESCRIPTION
6.1 Introduction and Purpose
This chapter summarizes the overall project description for Phases 1 and 2. This information was used as a basis for the CEQA documentation process.
The City provides wastewater treatment services to residents, industrial, and commercial dischargers at the Santa Maria WWTP, and provides septage receiving services for the community and the region at the same location. Per a newly issued General Permit by the Central Coast RWQCB, the City is now required to comply with updated effluent discharge limits. The current treatment plant does not meet some of those effluent limits. Consequently, the proposed project would increase the treatment capacities of the wastewater system to comply with the newly issued general permit as well as address planned growth in the City.
The proposed project involves the modification and expansion of wastewater treatment facilities owned and operated by the City. The intent of the project is to expand and update the existing Wastewater Treatment Plant to accommodate the existing and future anticipated growth, provide long-term and reliable treatment, and protect the community and environment while adhering to all applicable regulations.
6.1.1 Project Applicant
City of Santa Maria, Utilities Department
2065 East Main Street
Santa Maria, CA, 93454
6.1.2 Project Location
The wastewater treatment site is located at 601 Black Road, Santa Maria, CA 93458, approximately four miles west of U.S. Highway 101, west of the City of Santa Maria, within the city limits, and in Santa Barbara County, as shown in Figure 6.1. The project area is an irregular shape located southeast of the intersection of Ray Road and West Main Street, bifurcated by Black Road. The existing Wastewater Treatment Plant is located on the west side of Black Road, and the remaining project area is located on City-owned land east of Black Road, currently being leased as interim farmland. The site occupies City-owned land, including Assessor's Parcel Numbers (APNs) 113-120-034, 117-191-010, 117-820-002, and 117-191-013. The current WWTP is situated on APN 113-120-034.
Approximately one-half of the project site is developed, consisting of preliminary and primary treatment, secondary trickling filters and secondary clarification, anaerobic digestion, sludge drying beds, percolation ponds, pumps, tanks, process areas, and associated buildings for the existing WWTP. The remainder of the site consists mainly of interim agricultural row crops with sparse cover of ruderal vegetation along the margins of the fields. Several irrigation ditches are also present along the road shoulders and in the WWTP. According to historical aerial imagery, vegetation within the project site is subject to regular anthropogenic disturbance associated with the operations of the existing facilities (i.e., vegetation VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-2
clearing, facility maintenance, and agriculture), and the site has remained in its current condition for more than 60 years. Adjacent parcels consist of agricultural fields to the north, south, east, and west; Ray Road to the west; an irrigated pasture and Atlas Performance Industries (API) Trailers to the east; Santa Maria Railroad right-of-way to the south; and an auto wrecking yard is located to the south. There are no undisturbed open spaces in the vicinity of the project site.
The project site is located within the Central Coast sub-region of the California Floristic Province (Baldwin et al. 2012) and within the Corralitos Canyon watershed (Hydrologic Unit Code 180600080503).
The project site is relatively flat with almost no topographic variation and is at an elevation of approximately 168 feet above mean sea level. There are several irrigation ditches present within the project site; however, these features are maintained and have no downstream connection to other waters.
All storm water that falls within the WWTP site is collected and treated in the plant and then sent to the percolation ponds to disposal.
As illustrated in Figure 6.2, the project will proceed within the outlined portions east and west of Black Road.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-3
Figure 6.1 Proposed Project Location
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-4
Table 6.1 Site Information
Characteristic Description
Project Size West Black Road: 210 acres
East Black Road: 100 acres
Existing Land Use Community Facilities
Surrounding Land Use Agriculture
Public Services and Utilities Water Supply: City of Santa Maria Sewage: City of Santa Maria
Fire and Police: City of Santa Maria Police and Fire
Departments
Electricity: Pacific Gas & Electric
Telecommunications: Verizon
Figure 6.2 Proposed Project Extents
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-5
6.2 Existing Wastewater Treatment Plant Operations
Over the 18-month period between July 2023 and December 2024, the WWTP received an average influent flow of 6.9 mgd. It treats the incoming domestic wastewater flow through screening and grit removal, primary clarification, primary and secondary trickling filters, secondary clarification, and disposal via percolation ponds. Separate solids handling facilities, including anaerobic digestion, are utilized to process biosolids to Class B requirements. Digested solids are partially dried in open lined sludge drying beds before the solids are trucked from the site for disposal. The current facilities at the site include the items listed in Table 6.2.
Table 6.2 Existing Structures at the Santa Maria WWTP
Existing Process Area Quantity
Liquids
Septage Receiving Station 1x
Bar Screen Facility 1x
Grit Chambers 1x
Primary Trickling Filters 2x
Primary Clarifiers 2x
Intermediate Clarifier 1x
Secondary Trickling Filters 2x
Secondary Clarifiers 2x
Percolation Ponds 18x (1)
Solids
Solids Thickeners 2x
Anaerobic Digesters 4x
Gas Flare 2x
Sludge Drying Beds (lined) 13x
Notes:
(1) Original 15 ponds plus Ponds A-1, A-2 and A-3.
6.3 Proposed Project Characteristics
The Proposed Project would provide a maximum monthly capacity of 11.5 mgd and change the biological treatment regime from trickling filters to a nutrient removal activated sludge process. The treatment processes would be constructed on the existing disturbed site and would be built in two phases. In addition, new percolation ponds would be constructed on the farmland area east of Black Road. The construction on the existing site would entail removal of several existing structures, and the addition of multiple new facilities. The existing process areas and equipment to be demolished and the new process areas and equipment to be constructed are shown in Table 6.3 and Table 6.4, respectively.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-6
Table 6.3 Structures to be Removed During Proposed Phase 1 Project Process Structure to be Removed Quantity
Primary Trickling Filters(1) 2x
Secondary Trickling Filters 2x
Sludge Drying Beds 8x
Sludge Thickeners(2) 1x
Grit Chamber 1x
Secondary Clarifiers 2x
Utility Building(3) 1x
Notes:
(1) Although both primary trickling filters are slated for demolition, there is ongoing discussion about the possibility of retaining one of these units for re-use.
(2) There are two gravity thickeners, one of which is planned for demolition and the other would be rehabilitated. (3) Will be replaced.
Table 6.4 Structures to be Constructed During Proposed Phase 1 Project Process Structures Added as part of Phase 1 Project Quantity Aeration Basins 4x(1)
Secondary Clarifier 3x
Tertiary Filters 2x
Anaerobic Digesters 2x
Dewatering Facility 1x
Sludge Storage 1x
Percolation Ponds 6x(2)
Digester Gas Flare 2x
Hot Water Boiler 2x
Utility Building 1x
Cogeneration Gas Engine 1x
Septage Treatment 1x
Notes:
(1) Preliminary estimate. The number of aeration basins to be installed will be determined as part of the preliminary and final design.
(2) The percolation ponds will be constructed as a “near-term” project – discussed in more detail in the following sections.
The proposed project is anticipated to fulfill the demands of the community beyond 2060. Phase 1, to be constructed by the end of 2034, will be sized to meet flow and loading projections until 2052, by which time construction of the Phase 2 facilities will be complete. The structures listed in Table 6.4 are for the Phase 1 expansion. The Phase 2 expansion is anticipated to be modifications and expansion to the new facilities provided in Phase 1. However, changes in future growth, regulations, and treatment objectives could significantly change both the timeline and design requirements of the Phase 2 expansion.
The preliminary layout for the Phase 1 and 2 project is shown in Figure 6.3. Facilities shown in light blue are the liquid treatment facilities that would be constructed or reused in the Phase 1 configuration, and those shown in dark blue are those that would be constructed in Phase 2. The solids handling facilities that will be provided in Phase 1 are shown in the light orange color, both new and existing. O&M facilities VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-7
are shown in green, most of which will be reused. Note that the new percolation ponds are not shown in Figure 6.3. These ponds are discussed later.
Figure 6.3 Proposed Phase 1 (Light Blue and Orange) and Phase 2 (Dark Blue) Structures on Existing WWTP Site
6.4 Near-Term Projects
To prepare the site for the upcoming Phase 1 project, some near-term projects were considered as part of the planning process. The objective was to confirm whether these projects needed to be completed prior to the Phase 1 project to ensure that the core treatment functions of the WWTP are not impacted during construction, so that the plant remains in compliance with its interim permit limits. In addition, these projects were also considered to set the stage for the construction activities that will follow in Phase 1.
The first project considered is the percolation pond expansion east of Black Road. The second was possible construction of some temporary tertiary filters to improve the quality of the existing effluent to more closely align with the initial interim discharge limits. The third project was construction of a dewatering facility and sludge storage system to create space for constructing Phase 1 secondary treatment structures. The tertiary filters and the dewatering facility projects are briefly discussed below.
Neither of these projects were ultimately selected as near-term projects.
6.4.1 Temporary Tertiary Filtration
To reduce biochemical oxygen demand and total suspended solids to facilitate meeting interim effluent limits, the City was tasked with conducting a pilot study to assess the suitability of installing a temporary tertiary filtration system. This was a requirement from the Time Schedule Compliance Plan. The City VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-8
completed piloting testing of a tertiary cloth filter unit in March 2025. Based on the results of the pilot testing, a cost estimate to provide temporary filtration to treat about 80 percent of the secondary trickling effluent was developed. The results of the pilot testing and the estimated cost to install and operate the filters were discussed with the RWQCB at a meeting in November 2025. Based on those discussions, it was concluded that the added cost of installing a temporary filtration system that would likely take years to get operational and would be an extra financial burden for the City would not be required. In addition, the RWQCB agreed to modify the interim effluent quality limits to values that more closely match what the existing WWTP can achieve. As a result, this near-term project is no longer needed and will not be constructed.
6.4.2 Dewatering Facility
A majority of the new WWTP Phase 1 and Phase 2 site improvements will be constructed in the area currently occupied by the sludge drying beds. Because of this, a new mechanical dewatering facility was considered for a near-term project to be completed prior to demolition of the existing sludge drying beds. The City conducted a preliminary evaluation of what the new dewatering facilities would look like and how they would tie into the existing plant, including road improvements to provide access for construction, and regular operation for dewatered sludge storage and removal.
After further consideration, the City decided that because of required number of tie-ins to the existing facilities, and potential interferences with the future Phase 1 facilities, it would be best not to construct the dewatering facility as a separate near-term project. Rather, this project will be incorporated into the Phase 1 project and will be constructed as an early project milestone in order to free up site space for the other Phase 1 facilities.
6.4.3 Project 1 - Percolation Pond Construction
The only project that will move forward as a near-term project is construction of new percolation ponds and the associated facilities. These ponds will be constructed on City-owned land that is currently leased for interim farming. The project will construct up to 6 new percolation ponds for a total of 42 acres of percolation ponds, within about 100 acres of available land, including contractor laydown areas, soil stockpiles, and access roads, etc. The preliminary location of the new ponds is shown in Figure 6.4. A solar array will be constructed by the City along the northeastern portion of the boundary line, which is outside of the scope of this project and due to be constructed prior to the completion of the ponds. Permanent access to the ponds will be established off Black Road. One possible access point is shown in the figure, and this will confirmed during the design phase of the project. A possible contractor laydown area for storage of equipment and materials is shown, along with areas temporarily designated for storage of spoils from excavation prior to reuse or removal from the project site.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-9
Figure 6.4 Preliminary Layout of Proposed Percolation Pond Project The depth of the new percolation ponds is expected to vary depending on the geological and morphological qualities of the soil within the project site. Current estimations put the average depth of each pond at approximately 13 feet below grade level. Associated infrastructure, including berms, would VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-10
vary in height depending on the final grading of the area; however, the maximum berm height is generally estimated to be less than 5 feet above the existing grade across the site. Given that there are 6 ponds to be installed, with an area of 7 acres each, this means that the expected excavated soil volumes will reach around 390,000 cubic yards. As noted, the designated temporary stockpile areas are also shown in Figure 6.4.
It is expected that the construction of the ponds will begin around Q3 2027 and be completed by Q3 2029.
6.5 Wastewater Treatment Plant Phase 1 Upgrades
Most of the facilities described above for Phase 1 will be constructed beginning around Q1 2030. The specific structures to be built were noted in Tables 6.3 and 6.4 above. By the time this work begins, construction of the new percolation ponds will be complete, and the Phase 1 construction activities will all occur within the limits of the existing WWTP.
Because the WWTP must continue to operate and treat wastewater during construction, the sequencing and location of the proposed improvements are critical. Each of the new process structures must not impact ongoing operation of the WWTP during their construction. As such, most of the new construction will occur in areas currently occupied by the existing sludge drying beds. Road improvements and underground piping improvements will be required throughout the site.
Figure 6.5 summarizes the proposed layouts for the new liquid and solids treatment Phase 1 structures.
The construction area impacted during this upgrade totals approximately 40 acres. In addition to the treatment upgrades discussed herein, the existing Utility Building is also at the end of its useful life and will be replaced as a part of Phase 1. The existing building will be demolished, and the new Utility Building will be located in the same place, but shifted south to allow greater clearance for tractor-trailer traffic through the facility for cake hauling and chemical delivery. These changes are illustrated in Figure 6.6.
Corresponding abbreviations for the acronyms highlighted in the figures are: PC: Primary Clarifier, HW:
Headworks, OP: Operations Building, GC: Grit Chamber, AD: Anaerobic Digester, SS: Solids Storage, DB:
Dewatering Building, ThF: Thickening Facility, GT: Gravity Thickener, AB: Aeration Basin, BLWR: Blower, SC:
Secondary Clarifier, TF: Tertiary Filters, C: Carbon Addition, ELEC: Electrical Building, BATT: Battery Bank and Microgrid Controller, SepTr: Septage Treatment, SepRec: Septage Receiving.
VOLUME 6 / CHAPTER 6: PROJECT DESCRIPTION
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-11
Figure 6.5 Phase 1 Upgrades
Figure 6.6 Phase 1 - Preliminary Arrangement for Digester Area and Truck Routing Improvements Given the scope and size of this project, it is expected that it will take 5 years to construct, beginning in Q1 2030 and completion in Q4 2034.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A DETAILED SCREENING RESULTS
VOLUME 6 / CHAPTER 1: SCREENING AND EVALUATION OF LIQUID TREATMENT PROCESS ALTERNATIVES OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN A-1 pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 6/Appendix A.docx
DETAILED SCREENING RESULTS
Category Technology Technology Maturity
and Risk
Screening Criteria Selected for
Further Evaluation
Justification Notes for Selection / Non-Selection for Further Evaluation (Based on BioWin process modeling for some technologies) Ability to meet regulations
Technology
Maturity & Risk
Site
Constraints
Chemical
Usage
Costs Conclusion
Activated Sludge Biological Nutrient Removal MLE Established Pass Pass Pass Pass Pass Pass Selected Will provide TN < 8 mg/L with chemical addition Oxidation Ditch Established Pass Pass Pass Pass Pass Pass Selected Easiest to operate and will provide TN < 8 mg/L 4-Stage Bardenpho Established Pass Pass Pass Pass Pass Pass Selected Provides highest level of TN removal 5-Stage Bardenpho Established Pass Pass Pass Pass Pass Pass 5-Stage Bardenpho is similar to 4-Stage Bardenpho with phosphorus removal. Although 5-Stage Bardenpho meets all the screening criteria, phosphorus removal is not anticipated to be a future requirement for the City and therefore, 5-Stage was not selected Step Feed Established Fail Pass Pass Pass Pass Fail Will not achieve TN < 10 mg/L reliably Simultaneous Nitrification / Denitrification
Emerging Pass Fail Pass Pass Pass Fail Complex operation, and more difficult to control than other processes. Could be implemented as part of an operational strategy with any of the alternatives. In addition, very susceptible to poor settling due to high risk of low DO filament growth Activated Sludge Intensification
MBR Established Pass Pass Pass Pass Fail Fail Would achieve permit requirements but has significantly higher capital and O&M costs, and additionally there are no space limitations and / or need for membrane quality effluent IFAS Established Pass Fail Pass Pass Pass Fail Not broadly applied across industry, insufficient O&M experience BAS Established Pass Fail Pass Pass Pass Fail In addition to technology maturity, lots of mechanical equipment that are points of failure and risk AGS Emerging Pass Fail Pass Pass Pass Fail Insufficient successful full-scale operating experience MABR Emerging Pass Fail Pass Pass Pass Fail Requires operation at low SRTs and needs piloting to confirm process performance, can be considered in future for capacity expansion
High-Rate A-Stage / B-Stage
(A / B)
Emerging Pass Fail Pass Pass Pass Fail Insufficient successful full-scale operating experience, complex process controls and increased risk of poor settle ability due to low DO operation, and difficulty meeting permit requirements without addition of other processes Mainstream Deammonification Emerging Pass Fail Pass Pass Pass Fail Nitrate Shunt Emerging Pass Fail Pass Pass Pass Fail
Anaerobic MBR Emerging Fail Fail Pass Pass Pass Fail
Post Secondary Removal
Nitrification Trickling Filters Established Fail Pass Pass Pass Pass Fail Would require expansion of the current trickling filter process which is an outdated process and is currently not performing well, additionally will have high chemical costs due to chemical addition Denitrification Trickling Filters Established Fail Pass Pass Fail Pass Fail BAF Established Fail Pass Pass Fail Pass Fail
MBBR Established Fail Pass Pass Pass Pass Fail
Notes: AGS - Aerobic Granular Sludge, BAF - Biologically Aerated Filter, BAS - Biofilm Activated Sludge, IFAS - Integrated Fixed-Film Activated Sludge, MABR - Membrane Aerated Biofilm Reactor, MBBR - Moving Bed Biofilm Reactor, MBR - Membrane Bioreactor, MLE - Modified Ludzack Ettinger VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B PROCESS MODELING OF LIQUID
TREATMENT ALTERNATIVES
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 6/Appendix B.docx
PROCESS MODELING OF LIQUID TREATMENT
ALTERNATIVES
Process Model Development
Steady-state process models were developed using BioWin version 6.2 (EnviroSim) for each of the future facilities process configurations. The flow and load projections developed in Volume 2: Basis of Planning were used as input for modeling of the process configurations for future facilities. The process models were developed using custom-configured unit process modules that reflect the process configuration of the selected nitrogen removal technologies. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model.
Influent Conditions
Influent conditions used for process modeling of alternatives are described in Table 1.6 in Volume 6 Chapter 1.
Wastewater Characteristics
BioWin model utilizes chemical oxygen demand (COD) modeling which uses influent COD data as an input and calculates various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) are not a direct input but are calculated based on the influent COD and wastewater fractions values. To calibrate the model to the existing wastewater treatment plant (WWTP), wastewater characteristics were sampled and analyzed as described in Volume 3. However, with the exception of ammonia (NH3) and orthophosphate fraction, the influent COD fractions were not used for modeling future facilities because the sampling event was conducted during a period when the City of Santa Maria’s (City) WWTP experienced low incoming flows and loads. The sampling event was conducted in December, and the City staff noted that incoming flows and loads are typically lower during the wet weather months. Since the historical data is more consistent and has been collected and analyzed over several years, it is considered more reliable compared to data collected during the one week of sampling event. To better match the historical data for the modeling of future facilities default influent wastewater characteristics were utilized. If wastewater characterization developed in Volume 3 was utilized for modeling purposes, the future facilities would be sized for higher loads than historical data, which would result in future facilities being oversized. The flow and load projections were also developed based on the historical influent data.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-2
Table B.1 summarizes the wastewater characteristics utilized for modeling for future facilities.
Table B.1 Wastewater Characteristics
Parameter Default Modeled
Fbs - readily biodegradable COD (including acetate) 0.16 0.16 Fus - unbiodegradable soluble 0.05 0.05
Fna - NH3 0.66 0.70
Fpo4 - phosphate 0.50 0.48
Particulate COD: VSS 1.63 1.63
BOD calculation rate constant for Xsc degradation 0.5 0.5 BOD calculation rate constant for Xsp degradation 0.5 0.5 Notes:
BOD - biochemical oxygen demand; VSS - volatile suspended solids Process Configurations
The following liquid treatment processes were modeled and evaluated. Each of the alternatives was modeled and evaluated with and without primary clarifiers (PCs) and digesters. Modified Ludzack Ettinger (MLE).
Oxidation Ditches.
4-Stage Bardenpho.
Figure B.1 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.1 MLE With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-3
Figure B.2 shows the process model configuration for MLE without the addition of PCs and digesters.
Figure B.2 MLE Without PCs and Digesters
Figure B.3 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.3 Oxidation Ditch With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-4
Figure B.4 shows the process model configuration for MLE with the addition of PCs and digesters.
Figure B.4 Oxidation Ditch Without PCs and Digesters
Figure B.5 shows the process model configuration for 4-Stage Bardenpho with the addition of PCs and digesters.
Figure B.5 4-Stage Bardenpho With PCs and Digesters
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-5
Figure B.6 shows the process model configuration for 4-Stage Bardenpho with the addition of PCs and digesters.
Figure B.6 4-Stage Bardenpho Without PCs and Digesters
Detailed Sizing Criteria
Table B.2 summarizes a detailed planning level sizing criteria that was developed for liquid treatment process alternatives.
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-6 Table B.2 Summary of Planning Level Sizing Criteria for Alternatives Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
Recycle Streams
Thickener Overflow Flow, mgd 0.30 0.42 0.21 0.47 0.28 0.43 TSS, mg/L 717 308 900 313 735 311 TSS, lb/day 1,793 1,079 1,576 1,225 1,287 1,220 Decant from Drying Beds Flow, mgd 0.06 -- 0.05 -- 0.06 -- TSS, mg/L 1,649 -- 1,402 -- 1,641 -- TSS, lb/day 825 -- 584 -- 684 -- PCs
Flow, mgd 10 -- 10 -- 10 -- Area in Service, sf - Average 10,000 -- 10,000 -- 10,000 -- Overflow Rate, gpd/sf - Average 1,000 -- 1,000 -- 1,000 -- Overflow Rate, gpd/sf - Peak 1,900 -- 1,900 -- 1,900 -- COD, mg/L 551 -- 551 -- 550 -- CBOD, mg/L 282 -- 280 -- 282 -- TSS, mg/L 141 -- 145 -- 141 -- TKN, mg/L 74 -- 72 -- 74 -- NH3, mg/L 60 -- 58 -- 60 -- Primary Sludge
Flow, mgd 0.07 -- 0.07 -- 0.07 -- % TS 3.5 -- 3.5 -- 3.5 -- TS, lb/day 20,433 -- 20,433 -- 20,433 -- % VS 0.95 -- 0.95 -- 0.95 -- VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-7 Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
Aeration Basins
Anoxic Fraction, % 25 25 21 21 35 35 Total Volume, MG 5.9 13.4 10.1 15.0 5.9 13.0 aSRT, days Annual Average 7 11.2 11.9 11.9 7 9.7 Maximum Month 5.5 9 9.5 9.5 5.5 7.8 Total SRT, days Annual Average 8.8 15.0 15.0 15.0 9.4 15.0 Maximum Month 6.9 12.0 12.0 12.0 7.4 12.0 MLSS, mg/L 3,000 3,000 3,000 3,000 3,000 3,000 MLR, % 600 500 -- -- 400 200 HRT, hrs 14 32 18 36 14 31 DO Concentration, mg/L Aerobic Zone 1 2.0 2.0 2.0 2.0 2.0 2.0 Aerobic Zone 2 1.0 1.0 1.0 1.0 1.0 1.0 Re-aeration 0.5 0.5 Air Demand, scfm 16,200 20,600 15,600 20,600 Power Draw, hp 620 780 1,080 1,490 590 780 Methanol, lb COD/day 6,940 439 0 0 3,680 0 Secondary Clarifiers
Total Area in Service, sf - Peak 26,000 26,000 26,000 26,000 26,000 26,000 Design SVI, mL/g 150 150 150 150 150 150 Overflow Rate, gpd/sf - Average 385 385 385 385 385 385 Overflow Rate, gpd/sf - Peak 781 781 781 781 781 781 RAS Rate, % 100% 100% 100% 100% 100% 100% VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT MASTER PLAN B-8 Parameter
MLE With
PCs and
Digesters
MLE Without
PCs and Digesters
Oxidation Ditch
With PCs and
Digesters
Oxidation Ditch
Without
PCs and Digesters
4-Stage Bardenpho
With
PCs and Digesters
4-Stage Bardenpho
Without
PCs and Digesters
WAS
Flow, mgd 0.30 0.43 0.22 0.48 0.28 0.44 TSS, mg/L 6,000 6,000 6,000 6,000 6,000 6,000 TSS, lb/day 15,012 21,517 11,200 24,019 14,011 22,017 VSS, % 88 88 88 88 88 88 Effluent
COD, mg/L 63 62 63 65 62 62 CBOD, mg/L 6 4 5 5 6 4.5 TSS, mg/L 12 12 12 12 12 12 TKN, mg/L 3.2 3.1 3.4 3.6 2.9 3.2 NH3, mg/L 0.2 0.1 0.6 0.7 0.1 0.4 NO3, mg/L 6.5 6.0 0.1 0.0 5.5 4.2 NO2, mg/L 0.1 0.0 0.5 0.1 0.0 0.1 TN, mg/L 9.8 9.1 4.0 3.8 8.5 7.5 TWAS
Flow, mgd 0.07 -- 0.07 -- 0.07 -- % TS 6.0 -- 6.0 -- 6.0 -- TS, lb/day 35,028 -- 35,028 -- 35,028 -- % VS 92 -- 92 -- 92 -- Notes: aSRT - aerobic solids retention time; DO - dissolved oxygen; gpd - gallons per day; hp - horsepower; hrs - hours; HRT - hydraulic residence time; lb/day - pounds per day; MG - million gallons; mg/L - milligrams per liter; mgd - million gallons per day; mL/g - milliliters per gram; MLR - mixed liquor recirculation; MLSS - mixed liquor suspended solids; NO2 - nitrite; NO3 - nitrate; RAS - return activated sludge; scfm - standard cubic feet per minute; sf - square foot; SRT - solids retention time; SVI - sludge volume index; TKN - total Kjeldahl nitrogen; TN - total nitrogen; TS - total solids; TWAS - thickened waste activated sludge; VS - volatile solids; WAS - waste activated sludge VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX C PRELIMINARY LAYOUTS
BLWR
SS* SC SC SC HW* GC* DB
SS* BAF
TF ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
AB
ALTERNATIVE 1 - PHASE 1
BLWR
SS* SC SC SC SC HWGC BAF
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
DB AB
TF
AB AB
SS SC SC ALTERNATIVE 1 - PHASE 2
KEY:
O&M Buildings
Phase 1
Electrical Buildings
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SRS
Aqueduct Easement
Boundary HWGC
SC SCSC DB TF BLWR OP MAINT
SS SS ELEC ELEC
BAF
AB ALTERNATIVE 1 - PHASE 1
KEY:
O&M Buildings
Phase 1
Electrical Buildings
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
BAF = Biological Aerated Filter
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SRS
Aqueduct Easement
Boundary HWGC
SC SC SC SC DB SC SC TF BLWR OP MAINT
SS SS ELEC ELEC
BAF
AB AB AB ALTERNATIVE 1 - PHASE 2
AD* SC SC SC TF
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
HW* ELEC
GC* PC* PC* ODODOD AD SS*
DB
ThF MAINT*
OP*
ALTERNATIVE 2 - PHASE 1
AD* SC SC SC TF
SC AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
HW ELEC
GC PC* PC* SC SC ODODOD ODOD AD SS*
DB MAINT*
OP*
ThF PCPC ALTERNATIVE 2 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
PC PC
OD ODOD
ThFAD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ALTERNATIVE 2 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
PC
PC PC
PC ODOD ODODOD
ThF AD AD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
ThF = Thickening Facility
SS = Sludge Storage
AD = Sludge Digester
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ALTERNATIVE 2 - PHASE 2
SC SC SC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ELEC
ODODODSS*
DB MAINT*
OP*
SS* HW* OD TF GC* ALTERNATIVE 3 - PHASE 1
SC SC SC SC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
ELEC
SC SC ODODOD ODOD DB MAINT*
OP*
SS* SS* HWGC OD TF
ALTERNATIVE 3 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
OD ODODOD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SS ALTERNATIVE 3 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
ODOD ODODOD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
OD = Oxidation Ditch
SC = Secondary Clarifier
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
SS
OD
ALTERNATIVE 3 - PHASE 2
BLWR
SC SC SC SS* C
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
PC* PC* AD* AD
AB DB
HW*GC* TF
ThF
ALTERNATIVE 4 - PHASE 1
BLWR
SC SC SC SC HW C
ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building MAINT*
OP*
PC* PC* PC GC AD*ADAD SC SC
AB TF
DB
SS PC ThF
ALTERNATIVE 4 - PHASE 2
SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB TF OP MAINT
SS ELEC ELEC
PC PC ThFAD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
AB
C BLWR
ALTERNATIVE 4 - PHASE 1
SC SC SC
SRS
Aqueduct Easement
Boundary HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
PC
PC PC
PC
ThF AD AD AD
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
PC = Primary Clarifier
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
C = Carbon Addition Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
C BLWR
ALTERNATIVE 4 - PHASE 2
BLWR
SC SC SC HW* SS* ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
GC* SS*
AB TF
DB
ALTERNATIVE 5 - PHASE 1
BLWR
SC SC SC SC HW SS* ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
TF = Tertiary Filters
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building
MAINT*
OP*
GC SS* SC SC
AB TF
DB
SS ALTERNATIVE 5 - PHASE 2
SC SC
SRS
HWGC
SC DB TF OP MAINT
SS ELEC ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
M = Methanol Chemical Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
BLWR SS ALTERNATIVE 5 - PHASE 1
SC SC SC
SRS
HWGC
SC DB SC SC TF OP MAINT
SS ELEC ELEC
KEY:
O&M Buildings
Phase 1
Electrical Building
Phase 1
Liquid Treatment
Phase 1
Solids Handling
Phase 1
Liquid Treatment
Phase 2
Solids Handling
Phase 2
HW = Headworks
GC = Grit Chamber
AB = Aeration Basin
SC = Secondary Clarifier
BLWR = Blower Facility
M = Methanol Chemical Facility
TF = Tertiary Filters
ThF = Thickening Facility
AD = Sludge Digester
SS = Sludge Storage
DB = Dewatering Building
OP = Operations Building
MAINT = Maintenance Building
ELEC = Electrical Building AB
BLWR SS ALTERNATIVE 5 - PHASE 2
VOLUME 6 / LIQUID TREATMENT APPROACH FOR ADDRESSING GENERAL ORDER OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX D OPERATIONS AND MAINTENANCE COSTS
PROJECT: Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria PREPARED BY: KR/DM
JOB #: COST ESTIMATE PREPARATION DATE: 07-Oct-24
LOCATION: Santa Maria, CA REVIEWED BY:
$ 5,760,000
$ 4,620,000
$ 6,460,000
$ 4,680,000
5 Bardenpho w/o PCs and Digs $ 5,270,000
4 Barndepho w/ PCs and Digs
2 Ox Ditch w/ PCs and Digs
3 Ox Ditch w/o PCs and Digs
1 MLE w/o PCs and Digs
CITY OF SANTA MARIA
ELEMENT # DESCRIPTION ANNUAL COST
The cost estimate herein is based on our perception of current conditions at the project location. This estimate reflects our professional opinion of accurate costs at this time and is subject to change as the project design matures. Carollo Engineers has no control over variances in the cost of labor, materials, equipment; nor services provided by others, contractor's means and methods of executing the work or of determining prices, competitive bidding or market conditions, practices or bidding strategies. Carollo Engineers cannot and does not warrant or guarantee that proposals, bids or actual construction costs will not vary from the costs presented as shown.
PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 1
DESCRIPTION : MLE w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/yr) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 2% Eq Cost Labor hours (hr/day) Unit Cost $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814 Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083 2 Aeration Basin
Mixers 3 0 15 45 34 24 293,955 $ 73,489 $ 73,489
Blowers 2 1 416 832 620 24 5,432,335 $ 1,358,084 $ 1,358,084 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041MLR Pumping 3 0 21 63 47 24 409,535 $ 102,384 $ 102,384 3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 3 3 2 5 4,403 $ 1,101 $ 1,101
4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 BAF
Effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 6 Chemical Addition
Methanol 17,739 $ 19.63 $ 348,217 $ 348,217
7 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Aerobic Sludge Storage
Aeration Blowers 1 1 28.9 29 22 24 188,784 $ 47,196 $ 47,196 Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 9 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978
Polymer Mixing 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461
Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 25829 $73 $ 1,897,111.89 $ 1,897,112
Polymer Consumption (20lb/DT) 77,486 $ 2.95 $ 228,583 $ 228,583 10 Maintenance $ 976,000 $ 976,000
SUM $ 5,759,818
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 2
DESCRIPTION : Ox Ditch w/ PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/yr) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Usage (gal/yr) Unit Cost ($/gal) Propane Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 2% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Primary Treatment 1 0 40 40 30 24 261,293 $ 65,323 $ 65,323 3 Aeration Basin
Mech Aerators 1,074 1,074 801 24 7,015,725 $ 1,753,931 $ 1,753,931Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041 4 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721WAS pumping 1 1 2 2 1 5 2,048 $ 512 $ 512 5 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 6 Primary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
7 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Sludge Thickening
Thickeners 3 1 2.55 8 6 7 10,382 $ 2,596 $ 2,596Thickened Sludge Pumps 2 1 6.375 13 10 7 17,304 $ 4,326 $ 4,326 Polymer Mixing 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730
Drain Pumps 1 1 8.5 9 6 7 11,536 $ 2,884 $ 2,884
Polymer Consumpion (12lb/DT) 66,902 $ 2.95 $ 197,362 $ 197,362 9 Anaerobic Digestion
Mixing Pumps 2 2 63.75 128 95 24 832,872 $ 208,218 $ 208,218 Sludge Transfer Pumps 2 1 21.25 43 32 24 277,624 $ 69,406 $ 69,406 Propane 1,520 $ 3.50 $ 5,319 $ 5,319
10 Aerobic Sludge Storage
Sludge Transfer Pumps 2 1 21.25 43 32 7 57,680 $ 14,420 $ 14,420 11 Dewatering Building
Screw Press 3 1 6.375 19 14 7 25,956 $ 6,489 $ 6,489
Polymer Mixing 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730
Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 12394 $32 397,739 $ $ 397,739Polymer Consumption (28lb/DT) 69,409 $ 2.95 $ 204,757 $ 204,757 12 Maintenance $ 1,112,000 $ 1,112,000
SUM $ 4,618,033
Notes
(1) Biosolids disposal costs based on current disposal operations: 70% of biosolids sent to Engel & Grey, 30% of biosolids sent to the City's landfill.
Process Power Carbon Addition Polymer Propane Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 3
DESCRIPTION : Ox Ditch w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (lb chemical/yr) Unit Cost ($/lb) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Aeration Basin
Mech Aerators 1,487 1,487 1109 24 9,713,578 $ 2,428,394 $ 2,428,394Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041 3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721WAS pumping 1 1 4 4 3 5 4,914 $ 1,229 $ 1,229 4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
6 Aerobic Sludge Storage
Aeration Blowers 1 1 28.9 29 22 24 188,784 $ 47,196 $ 47,196 Sludge Transfer Pumps 2 1 21.25 43 32 24 277,624 $ 69,406 $ 69,406 7 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978Polymer Metering Pump 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 28315 $73 2,079,772 $ $ 2,079,772Polymer Consumption (20lb/DT) 84,946 $ 2.95 $ 250,592 $ 250,592 8 Maintenance $ 995,500 $ 995,500
SUM $ 6,456,639
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 4
DESCRIPTION : Barndepho w/ PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (gal/yr) Unit Cost ($/gal) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Usage (gal/yr) Unit Cost ($/gal) Propane Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432 Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083
2 Primary Treatment 1 0 42 42 31 24 274,358 $ 68,589 $ 68,589 3 Aeration Basin
Mixers 6 0 15 90 67 24 587,910 $ 146,977 $ 146,977
Blowers 2 1 321 643 479 24 4,197,713 $ 1,049,428 $ 1,049,428 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041
MLR Pumping 3 0 17 50 37 24 327,628 $ 81,907 $ 81,907
4 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 2 2 2 5 2,867 $ 717 $ 717
5 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 6 Chemical Addition
Micro-C 153,838 4.61 $ 709,191 $ 709,191
7 Primary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
8 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
9 Sludge Thickening
Thickeners 3 1 2.55 8 6 7 10,382 $ 2,596 $ 2,596
Thickened Sludge Pumps 2 1 6.375 13 10 7 17,304 $ 4,326 $ 4,326 Polymer Pumps 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730 Drain Pumps 1 1 8.5 9 6 7 11,536 $ 2,884 $ 2,884
Polymer Consumpion (10lb/DT) 76,819 $ 2.95 $ 226,615 $ 226,615 10 Anaerobic Digestion
Mixing Pumps 2 2 63.75 128 95 24 832,872 $ 208,218 $ 208,218Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 Propane 1,520 $ 3.50 $ 5,319 $ 5,319
11 Sludge Storage
Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 12 Dewatering Building
Screw Press 3 1 6.375 19 14 7 25,956 $ 6,489 $ 6,489Polymer Metering Pump 3 1 1.7 5 4 7 6,922 $ 1,730 $ 1,730 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652 Cake Hauling 13557 $32 435,044.53 $ $ 435,045
Polymer Consumption (28lb/DT) 75,919 $ 2.95 $ 223,962 $ 223,962 13 Maintenance $ 889,000 $ 889,000
SUM $ 4,674,501
Notes
(1) Biosolids disposal costs based on current disposal operations: 70% of biosolids sent to Engel & Grey, 30% of biosolids sent to the City's landfill.
Process Power Carbon Addition Polymer Propane Cake Disposal Labor (1) PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 5
DESCRIPTION : Bardenpho w/o PCs and Digs
JOB # : 202301
O&M Costs
Maintenance Total
No. of Operating
Units
No. of Standby
Units Motor Power (hp) Total Operating Motor Power (hP) Power Input (KW) Operation Time (hr/day) Annual KWh Annual Power Cost Usage (lb chemical/yr) Unit Cost ($/lb) Chemical Cost ($/year) Usage (lb/yr) Unit Cost ($/lb active) Chemical Cost ($/yr) Solids Generation (wet tons/yr) Unit Cost ($/wet ton) Disposal Cost ($/yr) 4% Equipment Capital Cost per year Labor hours (hr/day) $/hour $/yr O&M Cost ($/yr) 1 Headworks
Influent Pumps 2 2 50 100 75 24 655,257 $ 163,814 $ 163,814 Screens 1 0 7 7 5 24 45,726 $ 11,432 $ 11,432Grit Removal 1 0 5 5 4 12 16,331 $ 4,083 $ 4,083 2 Aeration Basin
Mixers 6 0 15 90 67 24 587,910 $ 146,977 $ 146,977
Blowers 2 1 416 832 620 24 5,432,335 $ 1,358,084 $ 1,358,084 Drain Pumps 1 0 30 30 22 1 8,165 $ 2,041 $ 2,041
MLR Pumping 3 0 8 25 19 24 163,814 $ 40,954 $ 40,954
3 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24 982,885 $ 245,721 $ 245,721 WAS pumping 1 1 3 3 2 5 4,505 $ 1,126 $ 1,126
4 Filters
Filter effluent pumps 1 1 75 75 56 24 491,442 $ 122,861 $ 122,861 Filter backwash pumping 1 1 38 38 28 1 10,238 $ 2,560 $ 2,560 5 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 $ 1,179 $ 1,179
6 Aerobic Sludge Storage
Aeration Blowers 1 1 34 34 25 24 222,099 $ 55,525 $ 55,525 Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 $ 20,243 $ 20,243 7 Dewatering Building
Screw Press 6 1 6.375 38 29 7 51,912 $ 12,978 $ 12,978
Polymer Metering Pump 6 1 1.7 10 8 7 13,843 $ 3,461 $ 3,461 Filtrate Pump 1 1 17 17 13 7 23,072 $ 5,768 $ 5,768
Cake Conveyor 3 0 8.5 26 19 7 34,608 $ 8,652 $ 8,652
Cake Hauling 25629 $73 1,882,456.17 $ $ 1,882,456
Polymer Consumption (20lb/DT) 76,887 $ 2.95 $ 226,817 $ 226,817 8 Maintenance $ 950,500 $ 950,500
SUM $ 5,267,232
Notes
(1) Biosolids disposal costs based on disposal of sub-Class B biopsolids through contrat with Synagro.
Process Power Carbon Addition Polymer Cake Disposal Labor (1)
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 7: Water Reuse and Liquid
Disposal
FINAL / October 2026
CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 7: Water Reuse and Liquid
Disposal
FINAL/ October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.
Date: 2026.10.24 11:19:30-07'00'
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 7/_Cover-SealPage-TOC-Abbrev.docx Contents
CHAPTER 1 REUSE FEASIBILITY STUDY
1.1 Introduction 1-1
1.1.1 Purpose and Scope 1-1
1.2 Background 1-2
1.2.1 Study Area Description and Demographics 1-2
1.3 Water Supply Characteristics 1-3
1.3.1 Water Sources and Water Rights 1-3
1.3.2 Long-Term Water Supply Reliability 1-6
1.4 Water Use and Demands Projections 1-7
1.5 Projected Water Supply Versus Demands 1-8
1.6 Wastewater Characteristics and Facilities 1-8
1.6.1 Wastewater Treatment 1-8
1.7 Treatment Requirements for Reuse 1-9
1.7.1 Non-potable Recycled Water Regulations 1-9
1.7.2 Title 22 Use Area Requirements 1-11
1.7.3 Summary Treatment Requirements for Agricultural Reuse 1-12
1.7.4 Summary Treatment Requirements for Urban Reuse 1-13
1.7.5 General Irrigation Use Guidelines 1-13
1.8 Overview of Recycled Water Market 1-15
1.8.1 Agricultural Reuse 1-15
1.8.2 Urban Reuse 1-15
1.9 Agricultural Reuse 1-15
1.9.1 Demand Analysis - Market Identification and Quantification 1-15
1.10 Urban Reuse 1-24
1.10.1 Demand Analysis - Market Identification and Quantification 1-24
1.11 Viable Reuse Users/Opportunities 1-26
1.11.1 City-Owned Agricultural Land 1-26
1.11.2 Urban Development Complex 1-28
1.12 Project Alternatives Analysis 1-32
1.12.1 Pipeline Routing and Sizing 1-33
1.12.2 Alternative 1 1-33
1.12.3 Alternative 2 1-36
1.12.4 Alternative 3 1-38
1.12.5 Alternative 4 1-40
1.13 Planning and Design Assumptions 1-42
1.14 Key Infrastructure Components 1-42
1.14.1 Booster Pump Stations 1-42
1.14.2 Reservoir: Storage 1-44
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
1.14.3 Treatment Process Requirements for Title 22 Compliance 1-45
1.15 Planning Level Cost Estimates 1-46
1.16 Evaluating the Need for a Recycled Water Program 1-47
1.17 Conclusions 1-49
CHAPTER 2 EFFLUENT DISPOSAL
2.1 Introduction 2-1
2.1.1 Overview 2-1
2.1.2 Evaluation of Percolation Pond Performance 2-2
2.1.3 Pond Operations 2-4
2.2 Pond Area Estimates 2-5
2.2.1 Historical Percolation Pond Area 2-5
2.2.2 Updated Pond Area Survey 2-6
2.3 Pond Soils Assessment 2-7
2.3.1 Soils and Hydrogeological Investigation 2-7
2.4 Water Balance and Pond Capacity 2-8
2.4.1 Methodology 2-8
2.4.2 Pond Area Assessment 2-9
2.4.3 Water Balance Analysis 2-12
2.4.4 Maximum Pond Capacity Analysis 2-12
2.4.5 Results 2-15
2.4.6 Pond Percolation Capacity 2-18
2.5 Pond Rehabilitation and Cost 2-19
2.5.1 Need for Additional Percolation Pond Capacity 2-19
2.6 Conclusions/Recommendations 2-21
Appendices
APPENDIX A PRELIMINARY COST ESTIMATES
APPENDIX B CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
APPENDIX C YEH AND ASSOCIATES GEOTECHNICAL DATA REPORT
APPENDIX D GSI WATER SOLUTIONS PERCOLATION POND PERFORMANCE EVALUATION
APPENDIX E PROJECT MEMORANDUM - PERCOLATION POND EVALUATION
APPENDIX F SUMMARY OF PRIOR POND REHABILITATION WORK AND COST ESTIMATES FOR SOIL
CLEANING
Tables
Table 1.1 Population - Current and Projected 1-2
Table 1.2 Current and Projected Water Supplies (AFY) for the City 1-3 Table 1.3 Wholesale Supplies - Existing and Planned Sources of Water (Long-Term Average) 1-5
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Table 1.4 Groundwater Pumping Rights 1-6
Table 1.5 Supply Reliability for the City for Year 2040 1-7 Table 1.6 Current and Projected Water Use (AFY) for the City 1-8 Table 1.7 Current and Projected Water Supply Versus Demands (AFY) 1-8 Table 1.8 Summary Title 22 Recycled Water Types 1-10
Table 1.9 Comparison of Santa Maria's Treated Effluent Quality With Irrigation Water Quality Criteria 1-14
Table 1.10 Crop Acreages in 1-, 2-, and 5-Mile Buffers 1-16 Table 1.11 Monthly ET₀ Values (Inches per Month) for Zone 3 1-19 Table 1.12 Crop-Specific Kc Crop Coefficient Values 1-20 Table 1.13 Turf Grass Kc Crop Coefficient Values (From CIMIS) 1-31 Table 1.14 Alternative 1: Pipeline Specifications 1-33
Table 1.15 Alternative 2: Pipeline Specifications 1-36
Table 1.16 Alternative 3: Pipeline Specifications 1-38
Table 1.17 Alternative 4: Pipeline Specifications 1-40
Table 1.18 Alternative Parameter Summary 1-42
Table 1.19 Planning and Design Criteria 1-42
Table 1.20 Pump Station Sizing Requirements 1-44
Table 1.21 Storage Capacity Requirements 1-45
Table 1.22 Estimated Pond Surface Areas 1-45
Table 1.23 Summary of Preliminary Cost Estimates 1-46
Table 2.1 Average Effluent Discharge - July 2023 to December 2024 2-1 Table 2.2 Percolation Pond Construction and Performance 2-3 Table 2.3 Percolation Pond Areas 2-5
Table 2.4 Summary of Parameters Used to Obtain a Water Balance 2-8 Table 2.5 Percolation Pond Estimation Descriptions 2-9
Table 2.6 Pond 15 Topographic Survey Results - Area Estimation 2-10 Table 2.7 Calculated Percolation Pond Average Surface Areas 2-11 Table 2.8 Summary of Method Used to Determine the Water Balance 2-12 Table 2.9 Percolation Pond Maximum Depths 2-12
Table 2.10 Correction Factors For Calibrating New and Old Pond Depth Measurements 2-13 Table 2.11 Percolation Pond Rehabilitation and Estimated Cost 2-19 Figures
Figure 1.1 Zoning Map 1-4
Figure 1.2 Statewide Crop Mapping Dataset (i15) With 1-, 2-, and 5-Mile Buffers 1-17 Figure 1.3 Statewide Crop Mapping Dataset (i15) With 1- and 2-Mile Buffer Showing Crop Distribution 1-18
Figure 1.4 CIMIS Reference Evapotranspiration Zone Classifications 1-21 Figure 1.5 Monthly Irrigation Demand Graph for 1-Mile Buffer 1-22 Figure 1.6 Monthly Irrigation Demand Graph for 2-Mile Buffer 1-22 Figure 1.7 Monthly Irrigation Demand Graph for 5-Mile Buffer 1-23 Figure 1.8 Spatial Distribution of Urban Water Demand 1-25 Figure 1.9 Layout of City-Owned Agricultural Land 1-27
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
Figure 1.10 Monthly Irrigation Demand Graph for City-Owned Agricultural Land 1-28 Figure 1.11 Map of Urban Development Complex Showing the Total Irrigable Area for the Different Urban Users 1-30
Figure 1.12 Monthly Irrigation Demand Graph for Urban Development Complex 1-32 Figure 1.13 Pipeline Route: Alternative 1 1-35
Figure 1.14 Pipeline Route: Alternative 2 1-37
Figure 1.15 Pipeline Route: Alternative 3 1-39
Figure 1.16 Pipeline Route: Alternative 4 1-41
Figure 2.1 Aerial View of Existing WWTP and Percolation Ponds (2023) 2-2 Figure 2.2 Visual Comparison of Percolation Pond Performance in 2023 2-4 Figure 2.3 Topographic Survey Data for Percolation Ponds (2025) 2-6 Figure 2.4 Schematic of Pond Water Balance Calculation 2-9 Figure 2.5 Topographic Analysis of Pond 15 - Total Pond Overview 2-10 Figure 2.6 Topographic Analysis of Pond 15 - Zoomed-in View of Contours 2-11 Figure 2.7 Topographic and Aerial of Pond 4 2-14
Figure 2.8 Daily Influent Flow to the WWTP and 30-Day Rolling Average 2-15 Figure 2.9 Total Working Volume in All Ponds 2-17
Figure 2.10 Calculated Monthly Average Volume Percolated 2-18 Figure 2.11 Preliminary Layout for the Proposed New Percolation Ponds 2-20 VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vi
Abbreviations
AF acre-feet
AFY acre-feet per year
BOD5 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
CAD computer-aided design
CBOD carbonaceous biochemical oxygen demand
CCR California Code of Regulations
CCWA Central Coast Water Authority
CIMIS California Irrigation Management Information System CIP Capital Improvement Plan
City City of Santa Maria
CPT cone penetration test
CT Concentration Time
DDW Division of Drinking Water
DWR Department of Water Resources
EIR Environmental Impact Report
ET evapotranspiration
ft foot/feet
ft3 cubic feet
GIS geographical information system
gpm gallons per minute
GSI GSI Water Solutions
GSWC Golden State Water Company
GW groundwater
hp horsepower
L liter
µS/cm micro-Siemens per centimeter
MG million gallons
mg milligrams
mg/L milligrams per liter
mgd million gallons per day
min minute
mL milliliters
MPN most probable number
N/A not applicable
NOA Notice of Applicability
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN vii
NTU nephelometric turbidity unit
O&M operations and maintenance
psi pounds per square inch
PVC polyvinyl chloride
RWQCB Regional Water Quality Control Board
SBCAG Santa Barbara County Association of Governments
SWP State Water Project
SWRCB State Water Resources Control Board
TDH total dynamic head
TDS total dissolved solids
TSCP Time Schedule Compliance Plan
TSS total suspended solids
UV ultraviolet
UWMP Urban Water Management Plan
WWTP wastewater treatment plant
Yeh Yeh and Associates
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 REUSE FEASIBILITY STUDY
1.1 Introduction
This chapter aims to assess the feasibility and potential benefits of implementing a recycled water program for the Santa Maria Wastewater Treatment Plant (WWTP). The City of Santa Maria (City) currently percolates all the secondary effluent from its WWTP into the groundwater basin of which a calculated amount is applied as a return flow credit that is added to the City's water rights. While this method has been a longstanding practice, as part of this long-range master planning effort an evaluation of alternative uses for the treated effluent is being considered. In addition, the City is required to evaluate the feasibility of implementing reuse as a requirement of the City's waste discharge permit.
Specifically, this chapter will explore if beneficial reuse of treated effluent, such as for agricultural and urban irrigation/reuse presents a more sustainable and advantageous approach compared to continued percolation. The evaluation will consider technical requirements, demands analysis, identifying viable users and outlining their infrastructure needs, regulatory compliance, financial viability, and ultimately conclude if reuse would be in alignment with the City's long-term water resource planning objectives.
The objective of this analysis is to provide a technical foundation for understanding recycled water implementation possibilities, ensuring alignment with the regulatory framework.
1.1.1 Purpose and Scope
This study examines the feasibility of various recycled water applications, primarily for agricultural and urban irrigation, within the vicinity of the City. This evaluation includes:
Estimating demands for the available agricultural/urban users. Identifying potential reuse opportunities within the City. Assessing viable users for recycled water distribution. Determining infrastructure needs, including storage, pipelines and routing, and treatment technologies.
Evaluating regulatory requirements to ensure compliance with California Title 22 standards. Conducting a cost analysis to outline financial considerations.
By bringing these together, this chapter provides a foundation for understanding how and where recycled water could be integrated into existing water management practices if deemed advantageous.
Potable reuse scenarios are not being evaluated in this chapter, as the City does not have a water supply/demand imbalance that would necessitate implementing expensive projects such as the Indirect Potable Reuse. Further details on the City's Water Supply/demands are discussed in Sections 1.3, Water Supply Characteristics, and 1.4, Water Use and Demands Projections.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
1.2 Background
1.2.1 Study Area Description and Demographics
Santa Maria is located in the Santa Maria Valley within Santa Barbara County, California. It is bounded on the north by the Santa Maria River and the San Luis Obispo County line and includes a mix of developed and undeveloped areas to the west, east, and south of the City limits. The study area for this project focuses on a 5-mile radius from the City's WWTP, capturing the potential users and opportunities for water reuse.
1.2.1.1 Land Use
The City encompasses a variety of land uses, including residential, commercial, agricultural, industrial, and public spaces, reflecting its historical development from predominantly agricultural land to a more diverse urban landscape. The City’s land area is primarily characterized by residential and commercial uses. The City's urban development has historically followed a pattern of outward expansion, with annexation of surrounding lands to accommodate new housing and employment growth.
Figure 1.1 illustrates the land use distribution in the City. Residential developments represent the majority of land use in Santa Maria, with a predominance of single-family homes. The remaining portion of the City's land use is distributed between commercial and industrial uses. A majority of the agricultural land in the vicinity of the WWTP is comprised of truck nursery and berry crops.
Santa Maria's service area encompasses both incorporated and unincorporated areas of Santa Barbara County. While most of the service area falls within City limits, approximately 99 acres of the unincorporated county receive water from the City, and another 96 acres within the City limits are served by the Golden State Water Company (GSWC). This means that over 95 percent of the City's population relies on the municipal water system (2020 Urban Water Management Plan [UWMP] Santa Maria).
1.2.1.2 Population
The Santa Maria General Plan Update and the Santa Barbara County Association of Governments (SBCAG) forecast developed population, jobs, and housing projections until 2050, as presented in Volume 2:
Chapter 5, Table 5.1. This projection accounts for reduced growth rates over time, meaning the population will grow more quickly initially before tapering off in later years. A population deviation of 10 percent is included to account for any potential changes in real-world conditions. A summary of historic and projected population within the City's service boundaries is presented in Table 1.1.
Table 1.1 Population - Current and Projected(1)
Year Service Area Population
2010 99,553
2020 107,407
2030 127,600 ± 12,000
2040(2) 135,350 ± 13,600
2050 143,100 ± 14,500
Notes:
(1) Source: Santa Maria General Plan Update (2020).
(2) Estimated based on the Santa Maria General Plan Update (2020).
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Santa Maria has an average household size of 3.77 people, and while the City does not fully meet the criteria for a disadvantaged community, some areas are classified as a disadvantaged community based on state mapping tools. The City's median household income was estimated at $59,366 in 2018, which is approximately 93.1 percent of the statewide median (2020 UWMP Santa Maria).
1.3 Water Supply Characteristics
1.3.1 Water Sources and Water Rights
Santa Maria benefits from a multi-source water portfolio that ensures supply reliability across various hydrologic conditions. Table 1.2 summarizes the current and planned water supplies available to the City between 2020 and 2045. This information is based on the Stipulation and data provided by Central Coast Water Authority (CCWA), extracted from the 2020 UWMP.
The Stipulation defines the City's Water Rights in the Santa Maria Groundwater Basin. Under this agreement, established through the Santa Maria Groundwater Adjudication (Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al., Case No. 770214), the City has been assigned 5,100 acre-feet per year (AFY) of prescriptive groundwater rights and 14,300 AFY from Twitchell Reservoir recharge operations. Additionally, the Stipulation entitles the City to capture 65 percent of every acre-feet (AF) of State Water Project (SWP) water that is brought into the Basin by the City as an additional groundwater source from the Basin, reinforcing its long-term water supply reliability. A five-year rolling average of SWP water imported by the City multiplied by 0.65 is used to determine the City's additional water right.
Table 1.2 Current and Projected Water Supplies (AFY) for the City(1) Source 2020 2025 2030 2035 2040 2045
SWP Water(2) 10,492 10,399 10,305 10,212 10,118 10,025
Groundwater(3) 5,100 5,100 5,100 5,100 5,100 5,100
Twitchell Yield/Commingled GW(4) 14,300 14,300 14,300 14,300 14,300 14,300 Return Flows From SWP Water(5) 6,820 6,759 6,698 6,638 6,577 6,516 Total Supply Available 36,712 36,558 36,403 36,250 36,095 35,941 Notes:
GW - groundwater
(1) Source: 2020 UWMP, Table 6.1.
(2) Volumes shown for all years are based on the long-term reliability documented in The SWP Final Delivery Capability 2019 Report (California Department of Water Resources, Natural Resources Agency, 2020). (3) Groundwater supplies are based on prescriptive rights in Santa Maria Groundwater Basin as defined in the Judgement.
Pursuant to the Court's Phase 5 Statement of Decision, the City has been assigned 5,100 AFY of prescriptive right. (4) Further details can be found in Exhibit "F" of the Stipulation. (5) Pursuant to the Stipulation, the City is entitled to recapture 65 percent of its SWP purchases in the Basin based on a 5-year rolling average.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Source: UWMP 2020 Santa Maria.
Figure 1.1 Zoning Map
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Based on the information in the 2020 UWMP, the City's water supply is projected to remain relatively constant from 2025 to 2045 to meet water demands, with the majority of this demand being met by imported surface water, when available. However, the allocation of SWP water is heavily dependent on the seasonal precipitation in Northern California. Despite the potential shortages of imported water in drought years, the City is expected to have an available supply well in excess of projected demands (around 14,000 AF per year) through 2045 based on the groundwater rights and other sources.
Each of the water supplies shown in Table 1.2 is discussed below.
1.3.1.1 Groundwater from the Santa Maria Valley Basin
Santa Maria historically relied on groundwater pumping as a primary water source. The City holds 5,100 AFY of prescriptive groundwater rights in the Santa Maria Valley Basin, which is legally protected under a court-approved Stipulated Agreement. The basin remains healthy and is not in overdraft, and groundwater levels remain stable. Therefore, groundwater continues to provide a consistent and sustainable source of water for the City.
According to the 2020 UWMP, the City operates six active groundwater wells, with a total nominal well capacity of 13,950 gallons per minute (gpm), translating to 22,503 AFY of potential pumping capacity.
However, actual groundwater use has varied over time, averaging 4,648 AFY between 2016 and 2020, and increasing in recent years due to fluctuations in SWP allocations.
1.3.1.2 Wholesale Supply - State Water Project Imports
The City imports water from the SWP, a major infrastructure system that transports water from Northern California through the California Aqueduct and Coastal Branch pipeline. The City has an allocation of 17,820 AFY of SWP water, which is delivered through the Coastal Branch pipeline, which is operated by the member agencies of CCWA.
Under the groundwater basin adjudication agreement, the City is required to import at least 10,000 AFY of SWP water within the basin when available. This imported water supplements the City's overall supply and also contributes to groundwater recharge. Due to variations in annual SWP allocations, the City's actual deliveries fluctuate, with projected availability ranging from 10,492 AFY in 2020 to 10,025 AFY in 2045.
Table 1.3 presents the contracted volume available from CCWA to the City per Table A imported SWP water and the amount projected to be available to the City to meet the demands from 2025 through 2045.
Table 1.3 Wholesale Supplies - Existing and Planned Sources of Water (Long-Term Average)(1) Wholesale Sources Contracted
Volume 2020 2025 2030 2035 2040 2045
Purchased Water From SWP 17,820 10,492 10,399 10,305 10,212 10,118 10,025 Notes:
(1) Source: 2020 UWMP, Table 6.2; values shown for years 2025 through 2045 are predictions and represent about 55 to 60 percent of the City's long-term contract allocation.
1.3.1.3 Twitchell Reservoir Recharge
Twitchell Reservoir is another component of the Santa Maria Valley Groundwater Basin’s water management strategy, serving as a groundwater recharge and flood control facility. Located on the VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Cuyama River, Twitchell Reservoir was constructed by the United States Bureau of Reclamation and is operated by the Santa Maria Valley Water Conservation District to provide flood control and act as a water conservation reservoir.
The City has rights to 14,300 AFY of Twitchell yield from Twitchell Reservoir, which directly recharges the groundwater basin, ensuring sustainability. Controlled releases from the reservoir allow for maximum recharge through water percolation into the Santa Maria Riverbed.
1.3.1.4 Return Flows
A significant portion of SWP water used in the basin returns to the groundwater supply due to percolation from wastewater recharge. The City is entitled to claim 65 percent of its imported water, with recent averages between 6,516-6,820 AFY. This affords the City the opportunity to augment its groundwater rights, which enhances local water sustainability.
Table 1.4 presents the City's water rights of Twitchell Development Water, prescriptive rights, and return flows of its imported water. The available return flow to the City is calculated based on the five-year rolling average of SWP that the City imports. The return flow quantity in this table is based on the reliable amount of SWP water supplies as reported by CCWA in 2021.
Table 1.4 Groundwater Pumping Rights(1)
Basin Name Pumping Rights (AFY)
Twitchell Yield 14,300
Native GW Prescriptive Rights 5,100
Average Return Flows of Imported Water 6,516 - 6,820
TOTAL 25,916 - 26,220
Notes:
(1) Source: 2020 UWMP, Table 6.3.
1.3.1.5 Water Transfers and Exchanges
Santa Maria has the ability to engage in water transfers and exchanges with other SWP contractors to supplement supply when needed. These agreements allow for flexibility in managing water resources, particularly during drought years or SWP allocation shortages. Transfers may include purchases or exchanges with other SWP contractors.
While these arrangements are not a primary supply source, they serve as contingency options when necessary.
1.3.2 Long-Term Water Supply Reliability
The 2020 UWMP analysis confirms that Santa Maria's water supply is secure even under drought and climate change scenarios. Table 1.5 presents water supply projections for imported SWP water, groundwater, and return flows during a normal year, single-dry year, and multiple-dry years for the City for 2040. The normal year supply represents the expected supply under average hydrologic conditions, the dry year supply represents the expected supply under the single driest hydrologic year, and the multiple-dry year supply represents the expected supply during a period of five consecutive dry years.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Each scenario in Table 1.5 demonstrates that the City has significant water supply availability through 2045. Demands for the same time period are discussed in the following section.
Table 1.5 Supply Reliability for the City for Year 2040(1) Source
Normal
Water
Year
Single Dry
Water Year
Multiple Dry Water Years
Year 1 Year 2 Year 3 Year 4 Year 5
Imported Water From SWP 10,118 1,960 4,633 4,336 1,782 7,603 2,079 Twitchell Yield(2) 14,300 14,300 14,300 14,300 14,300 14,300 14,300 Groundwater(3) 5,100 5,100 5,100 5,100 5,100 5,100 5,100 Return Flows From SWP Water(4,5) 6,577 5,516 6,577 5,864 5,112 4,028 3,701 Total 36,095 26,876 30,610 29,600 26,294 31,031 25,180
Notes:
(1) Source: 2020 UWMP, Table 7.1.
(2) Granted under the Stipulation, subject to adjustments that could be ordered by the Court. (3) Groundwater supplies are based on prescriptive rights in the Santa Maria Groundwater Basin as defined in the Judgement.
Pursuant to the Court's Phase 5 Statement of Decision, the City has been assigned 5,100 AFY of prescriptive right. (4) Return flows are based on five-year rolling average of imported water. Single-dry-year impacts will not affect availability of return flows for previous five-year average.
(5) Multiple-dry year reliability of return flows considers the previous five-year rolling average of SWP imports. These projections assume five years of normal water years before the beginning of the multiple-dry year period.
The City's reliability supply analysis shows that:
In a normal year, total available water far exceeds demand (typically around 12,000 AFY), leaving a significant surplus.
In a single-dry year, Santa Maria's combination of groundwater, SWP imports, and Twitchell recharge ensures an uninterrupted supply.
In multiple-dry year periods, the City's diversified water portfolio and return flow system provide ongoing water availability without the need for restrictions.
1.4 Water Use and Demands Projections
The City's water demand is anticipated to grow steadily from 2020 to 2045 due to population increases, commercial expansion, and agreements to supply water to other agencies. Residential water use, which constitutes the largest portion of total consumption, is projected to rise from 7,283 AF in 2020 to 9,187 AF by 2045. Similarly, commercial and industrial sectors are expected to see growth, with commercial water use increasing from 1,950 AF in 2020 to 2,460 AF in 2045, and industrial use rising from 722 AF to 911 AF over the same period.
Water losses, which include leaks, unauthorized consumption, and metering errors, are projected to increase slightly, from 488 AF in 2020 to 615 AF by 2045. Additionally, sales, exchanges, and commitment of the City’s water rights for development in Orcutt through agreements with GSWC and Nipomo Community Services District are expected to increase from 2,520 to 3,420 AF annually by 2026, remaining steady thereafter.
In total, Santa Maria's water use is projected to grow from 13,244 AF in 2020 to 18,817 AF by 2045. This increase reflects both local demand and external agreements to supply water. The City continues to VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
implement water conservation efforts and infrastructure improvements to maintain efficiency and sustainability.
Table 1.6 Current and Projected Water Use (AFY) for the City(1) Water Use Sectors 2020 2025 2030 2035 2040 2045
Single-Family 5,398 5,878 6,155 6,432 6,708 6,809
Multi-Family 1,885 2,053 2,149 2,246 2,343 2,378
Commercial 1,950 2,124 2,223 2,323 2,423 2,460
Industrial 722 786 823 860 897 911
Landscape 1,430 1,557 1,630 1,704 1,777 1,804
Sales/Exchanges to Other Agencies 1,117 1,820 3,420 3,420 3,420 3,420 Losses 488 531 556 581 606 615
Other 254 277 290 303 316 320
Total 13,244 15,026 17,246 17,869 18,490 18,817
Notes:
(1) Source: 2020 UWMP, Table 4.2. and City corrections.
1.5 Projected Water Supply Versus Demands
The City's long-term water management strategy ensures that projected water demands through 2045 will be fully met with a surplus supply. By 2045, total water use, including residential, commercial, industrial, landscape irrigation, and sales to other water agencies, is projected to reach 18,717 AF. In comparison, the total typical available water supply for the City in 2045 is projected to be 35,941 AF. Table 1.7 shows the comparison of water supply versus projected demands through 2045.
Table 1.7 Current and Projected Water Supply Versus Demands (AFY)(1) Supply/Demand 2020 2025 2030 2035 2040 2045
Supply 36,712 36,558 36,403 36,250 36,095 35,941
Demand 13,244 15,026 17,246 17,869 18,490 18,817
Notes:
(1) Source: 2020 UWMP, Tables 4.2 and 6.1.
The supply projections indicate that, even in high-demand years (Table 1.5), the City will not experience shortages and will continue to have a significant buffer of available water beyond actual use. This surplus not only ensures the City's ability to meet all water needs but also provides flexibility in managing unexpected variations in supply, such as reduced SWP allocations or climate-related impacts. The City's proactive water management, including conservation programs, infrastructure improvements, and legal water rights protections, ensures a sustainable and reliable water supply through 2045 and beyond.
1.6 Wastewater Characteristics and Facilities
1.6.1 Wastewater Treatment
Santa Maria's wastewater treatment process consists of preliminary, primary, and secondary treatment before the treated effluent is discharged into percolation ponds. Preliminary and primary treatment VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
involves screening, grit removal, and settling, where solids are removed, and sludge is separated. In secondary treatment, currently the City uses trickling filters where microorganisms break down organic matter, reducing biochemical oxygen demand and eliminating remaining contaminants. Secondary clarifiers settle the solids generated by the biological activity as the final step of treatment. More details on the current treatment system can be found in Volume 3, Chapter 1.
Santa Maria does not currently operate a tertiary treatment system. Instead, the secondary treated effluent percolates into the Santa Maria Valley Groundwater Basin and utilizes the natural filtration capabilities of the soil in the process to further purify the water as it contributes to groundwater recharge.
The City receives credit in the form of water rights for a portion of the return flows for the percolated water based on the volume of imported water used by the City, as discussed earlier.
1.7 Treatment Requirements for Reuse
Recycled water intended for agricultural and urban reuse must meet specific treatment and quality standards to ensure it is safe for use and compliant with regulatory requirements. In California, these requirements are established under Title 22 of the California Code of Regulations (CCR), which sets the minimum treatment and disinfection criteria for different reuse applications. The level of treatment required depends on the type of use and potential for human contact, with urban applications typically requiring higher treatment standards than agricultural irrigation.
The preceding subsections provide an overview of the requirements for a recycled water project (both non-potable and potable) as laid out by the State.
Water recycling and potable reuse in California fall under the jurisdiction of the State Water Resources Control Board (SWRCB). Within the SWRCB, two departments are responsible for protecting the public health and environment with respect to water:
The Division of Drinking Water (DDW).
The Regional Water Quality Control Boards (RWQCBs).
The DDW regulates public drinking water systems and is responsible for developing regulations for recycled water and for reviewing recycled water projects. The RWQCBs, which are divided into nine regions across the State, develop and enforce water quality objectives and implement plans to protect the beneficial uses of the State's water, and write permits for recycled water projects. Santa Maria falls within the Central Coast RWQCB, also known as Region 3.
In summary, DDW protects drinking water quality and public health. The RWQCBs protect surface and groundwater quality. To permit a project, both agencies work together.
1.7.1 Non-potable Recycled Water Regulations
Title 22, Division 4, Chapter 3, Section 60301 and Section 60304 of the CCR lists four types of recycled water designated by the following factors: treatment process, total coliform requirement, and disinfection requirement. In addition, disinfected tertiary recycled water must meet turbidity requirements. These factors dictate the allowable end-use of the treated, recycled water. Table 1.8 summarizes this information.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Table 1.8 Summary Title 22 Recycled Water Types(1)
Recycled Water
Type Requirements Uses
Undisinfected
Secondary
Recycled Water
N/A Surface irrigation or orchards and vineyards (recycled water not to come in contact with edible portions of
crop).
Non-food-bearing trees.
Fodder and fiber crops and pasture for animals (not
producing milk for human consumption).
Seed crops not eaten by humans.
Food crops (must undergo pathogen-destroying
process before being consumed by humans).
Ornamental nursery stock and sod forms (no
irrigation 14 days prior to harvesting, retail, or access by the public).
Disinfected
Secondary-23
Recycled Water
TOTAL COLIFORM:
7 Day Median Concentration:
23 MPN/100 mL (median).
30 Day Median Concentration:
240 MPN/100 mL (total).
Cemeteries and Freeway landscaping.
Restricted Access Golf Courses.
Non-edible vegetation (access controlled so irrigated area cannot be used as a park, playground, or school
yard).
Pasture for animals producing milk for human
consumption.
Ornamental nursery stock and sod farms (public not
restricted).
Disinfected
Secondary-2.2
Recycled Water
TOTAL COLIFORM:
7 Day Median Concentration:
2.2 MPN/100 mL.
30 Day Median Concentration:
23 MPN/100 mL.
Surface irrigation of food crops where the edible
portion is produced aboveground and not contacted
by the recycled water.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
Recycled Water
Type Requirements Uses
Disinfected
Tertiary Recycled
Water
DISINFECTION REQUIREMENTS
(either):
Chlorine disinfection following filtration
that meets a CT of 450 mg-min/L with
a modal contact time of at least
90 minutes, based on peak dry
weather design flow.
Disinfection combined with filtration
that inactivates or removes 99.999
(5-log) of plaque forming units of
F-specific bacteriophage MS2 or polio
virus in wastewater.
TOTAL COLIFORM:
7 Day Median Concentration:
2.2 MPN/100 mL.
30 Day Median Concentration:
23 MPN/100 mL.
TURBIDITY(2):
Filter effluent turbidity does not
exceed 2 NTU (24-hour period).
Filter effluent turbidity is less than
5 NTU 95 percent of the time (24-hour
period).
Filter effluent turbidity never exceeds
10 NTU.
Food crops, including all edible root crops, where
recycled water comes in contact with the edible
portion.
Parks and Playgrounds.
School Yards.
Residential Landscaping.
Unrestricted Access Golf Courses.
Any other irrigation use not specified and not
prohibited by other sections of the CCR.
Notes:
CT - Concentration Time; L - liter; mg - milligrams; min - minute; mL - milliliter; MPN - most probably number; N/A - not available; NTU - nephelometric turbidity unit
(1) Source: SWRCB Title 22 Regulations Related to Recycled Water. Sacramento, California. https://www.waterboards.ca.gov/drinking_water/certlic/drinkingwater/documents/lawbook/rwregulations.pdf. (2) If the tertiary filtration system is a membrane filtration system (for example, microfiltration), then the turbidity limits become
0.2 NTU no more than 5 percent of the time within a 24-hour period, and must not exceed 0.5 NTU at any time.
1.7.2 Title 22 Use Area Requirements
As shown in Table 1.8, the different end uses of recycled water dictate the level of treatment required. The treatment requirement increases based on public health considerations from undisinfected secondary to disinfected tertiary effluent. For the purposes of this evaluation, all water considered for non-potable use will be treated to meet disinfected tertiary effluent requirements and would be based on media filtration, rather than membrane filtration. Additional Title 22 disinfected tertiary requirements are detailed below.
1. Irrigation with disinfected tertiary recycled water should be at least 50 feet from any domestic water supply well unless all of the following conditions are met:
a. A geological investigation demonstrates that an aquitard exists at the well between the uppermost aquifer being drawn from and the ground surface. b. The well contains an annular seal that extends from the surface into the aquitard.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
c. The well is housed to prevent any recycled water spray from coming into contact with the wellhead facilities.
d. The ground surface immediately around the wellhead is contoured to allow surface water to drain away from the well.
e. The owner of the well approves the elimination of the buffer zone requirement.
2. No impoundment of disinfected tertiary recycled water shall occur within 100 feet of any domestic water supply well.
3. Any use of recycled water shall comply with the following:
a. Any irrigation runoff shall be confined to the recycled water use area unless the runoff does not pose a public health threat and is authorized by the regulatory agency. b. Spray, mist, or runoff shall not enter dwellings, designated outdoor eating areas, or food handling facilities.
c. Drinking water fountains shall be protected against contact with recycled water.
4. All use areas where recycled water is used that are accessible to the public shall be posted with signs that are visible to the public.
5. Except as allowed under Section 7604 of Title 17 CCR1, no physical connection shall be made or allowed to exist between any recycled water system and any separate system conveying potable water.
6. Except for use in a cemetery that complies with the requirements of Section 8118 of the California Health and Safety Code2, the portions of the recycled water piping system that are in areas subject to access by the general public shall not include any hose bibs. Only quick couplers that differ from those used on the potable water system shall be used on the portions of recycled water piping system in areas subject to public access.
1.7.3 Summary Treatment Requirements for Agricultural Reuse To summarize Table 1.8 above, the treatment level required for agricultural irrigation depends on whether the crops are consumed raw or undergo processing before consumption.
Disinfected Tertiary Treated Water is required for crops intended for human consumption and eaten raw, such as lettuce, strawberries, and tomatoes. This involves:
Filtration to remove suspended solids.
Biological treatment to break down organic matter.
Disinfection using chlorine, ultraviolet (UV) light, or ozone to eliminate pathogens. 1 The type of protection that shall be provided to prevent backflow into the public water supply shall be commensurate with the degree of hazard that exists on the consumer’s premises (Title 17 CCR, 2019). 2 A cemetery supplied with disinfected tertiary recycled water that installs a hose bib in an area subject to access by the general public shall post signage and labeling visible to the general public that water is non-potable. The signage and label shall be regularly inspected by the water purveyor, as defined in Section 512 of the Water Code to ensure that the general public has proper notice of this fact.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Disinfected Secondary Treated Water can be used for crops that are not consumed raw or those that are processed before consumption, such as grains, nuts, and fodder crops. The treatment process includes:
Biological treatment to reduce organic and nutrient content. Basic disinfection to remove bacteria and viruses to an acceptable level.
Non-Food Crop Irrigation for crops like fiber plants, pasture grass, and landscaping generally requires only secondary treatment with basic disinfection. Salinity management is also a key consideration for agricultural reuse, as excessive salts and nutrients in recycled water can impact soil health and crop productivity.
1.7.4 Summary Treatment Requirements for Urban Reuse
Recycled water used for urban irrigation (such as parks, golf courses, and street medians) or non-potable applications (such as industrial cooling and toilet flushing) must meet higher treatment standards due to increased potential for public exposure.
Disinfected Tertiary Treated Water (Title 22 Standard) is required for irrigation of parks, playgrounds, school fields, and golf courses, landscaping in commercial and residential areas, non-potable indoor uses, and industrial water that may come into contact with workers, etc.
This level of treatment includes:
Filtration to remove fine particles.
Secondary biological treatment to eliminate organic matter. Disinfection through chlorination, UV, or ozone to remove pathogens.
For urban reuse, public health protections are critical. Proper signage, cross-connection prevention, and monitoring programs must be in place to ensure safe distribution and use of recycled water.
1.7.5 General Irrigation Use Guidelines
The successful long-term use of irrigation water depends more on rainfall, leaching, soil drainage, irrigation water management, salt tolerance of plants, and soil management practices than upon water quality itself. Since salinity problems may eventually develop from the use of any water, the following guidelines are given, should they be needed, to assist water users to better manage salinity in either agricultural or community-based irrigation:
Irrigate more frequently to maintain an adequate soil water supply. Select plants that are tolerant of an existing or potential salinity level. Routinely use extra water to satisfy the leaching requirements. If possible, direct the spray pattern of sprinklers away from foliage. To reduce foliar absorption, try not to water during periods of high temperature and low humidity or during windy periods. Change the time of irrigation to early morning, late afternoon, or night.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Maintain good downward water percolation by using deep tillage or artificial drainage to prevent the development of a perched water table.
Salinity may be easier to control under sprinkler and drip irrigation than under surface irrigation.
However, sprinkler and drip irrigation may not be adapted to all qualities of water and all conditions of soil, climate, or plants.
1.7.5.1 Established Guidelines for Interpretation of Water Quality for Irrigation Specific water quality requirements can be established based on the specific use of recycled water. For agricultural reuse applications, advanced treatment for total dissolved solids (TDS) and chloride could be required to meet crop-specific water quality thresholds. Strawberries, which are a common crop in the area, are sensitive to chloride concentrations in irrigation water.
Water quality guidelines for general landscape irrigation are based on practical limits for using different types of irrigation approaches, as well as the tolerance of various plants for specific constituents found in irrigation water. Table 1.9 includes a comparison of constituent guidelines/criteria, the Santa Maria WWTP effluent, and the City's current water supply (mix of State Water and local groundwater).
Table 1.9 Comparison of Santa Maria's Treated Effluent Quality With Irrigation Water Quality Criteria Parameter Units
Established Criteria WWTP
Effluent
(Median
Value)
Santa Maria Water
Supply(5) Degree of Use Restriction(1,2)
None Slight Severe
Salinity
Electrical Conductance µS/cm <700 700-3,000 >3,000 708(5) TDS mg/L <450 450-2,000 >2,000 884(3) 593(5)
Sodium
Foliar Absorption mg/L <70 >70 - 140(3) 48(5)
Chloride
Root Absorption mg/L <140 140-355 >365 150(3) 27(5)
Foliar Absorption mg/L <100 >100 - 150(3)
Boron mg/L <0.7 0.7-3.0 >3.0 0.37(3) 0.142(5)
Total Alkalinity (as CaCO3) mg/L <90 90-500 >500 310(3) 146(5) pH - 6.5-8.4 (normal range) 7.8(3) 7.1(5)
Total Nitrogen mg/L <5 5-30 >30 42(3)
Hardness (as CaCO3)(4) mg/L <90 90-500 >500 375-500(3) 375(5) Notes:
CaCO3 - calcium carbonate; µS/cm - micro-Siemens per centimeter (1) Adapted from University of California Committee of Consultants (1974) and Water Quality for Agriculture (Ayers and Westcot, 1985).
(2) Definition of the "Degree of Use Restriction" terms:
None = Reclaimed water can be used similar to the best available irrigation water.
Slight = Some additional management will be required above that with the best available irrigation water in terms of leaching salts from the root zone and/or choice of plants.
Severe = Typically cannot be used due to limitations imposed by the specific parameters. (3) Concentrations based on data WWTP effluent and City's drinking water CCR. (4) Presence of bicarbonate can result in unsightly foliar deposits. (5) Concentrations based on Averages as presented in the City's Drinking Water CCR.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
The constituents that can impact the use of recycled water for general landscape irrigation primarily include minerals and nutrients. In general, the comparison of most constituents in Table 1.7 suggests that there may be "slight" restrictions in the use of the City's effluent for irrigation. The total nitrogen concentrations indicate that there could be "severe" restrictions for irrigation use of the effluent from the current treatment plant. However, once the new treatment facilities are in operation (see Volume 6 for details), Total Nitrogen will be less than 10 milligrams per liter (mg/L), which would meet the "slight" restrictions category. If a recycled water project were to move forward, the City would need to do additional water quality testing and discuss the quality with the proposed end users to determine suitability.
1.8 Overview of Recycled Water Market
The recycled water opportunities within a 5-mile radius from the Santa Maria WWTP were evaluated in this study. This assessment incorporated multiple data sources, including land use and zoning data, geographical information system (GIS) layers like the Statewide Crop Mapping (i15) dataset, City water billing records, and input from City engineering and planning staff. Based on this analysis, agricultural irrigation and urban non-potable uses were identified as the most viable applications for recycled water in Santa Maria.
1.8.1 Agricultural Reuse
Recycled water can support the irrigation of crops commonly grown in the Santa Maria region, particularly those utilizing spray or drip irrigation systems. Given the Treatment Plant's proximity to extensive agricultural lands, recycled water presents an opportunity to make use of this source of water, rather than pumping groundwater for irrigation. The feasibility of agricultural reuse is influenced by factors such as crop type, water quality requirements, infrastructure availability, and seasonal irrigation demand.
Subsequent sections will focus on market identification and quantification, analyzing potential water demand and the logistical considerations associated with recycled water distribution for agricultural use.
1.8.2 Urban Reuse
Urban recycled water applications include non-potable uses such as landscape irrigation for parks, golf courses, municipal areas, cemeteries, and schools, as well as industrial processes and dust control. Many of these sites have consistent, year-round water demand, making them suitable candidates for recycled water integration. A GIS-based analysis of City water billing records was conducted, and conversations with the City Engineering Staff helped identify users who could potentially transition to recycled water.
Subsequent sections will examine the potential demand, infrastructure requirements, and feasibility of urban recycled water distribution.
1.9 Agricultural Reuse
1.9.1 Demand Analysis - Market Identification and Quantification The Agricultural Demand Analysis aims to quantify the potential demand for recycled water for agricultural irrigation within a 1-mile, 2-mile, and 5-mile radius of the Santa Maria WWTP. Agriculture was selected as the starting point for this assessment because it is the closest viable land to the treatment VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
plant, making it the most feasible and cost-effective option for recycled water use. The proximity of agricultural lands to the treatment facility minimizes the need for extensive pipeline infrastructure, reducing capital and operational costs associated with distribution. Additionally, agricultural irrigation has high and consistent water demands, particularly in dry months, making it an ideal sector for large-scale recycled water use.
To conduct this analysis, GIS-based crop mapping was utilized to identify land use and crop types within the defined radiuses. The Statewide Crop Mapping dataset (i15), developed by Land IQ in collaboration with the California Department of Water Resources (DWR), was used to determine the total acreage of each crop category within these buffers. Figure 1.2 shows the Statewide Crop Mapping dataset map with the 1-, 2-, and 5-mile buffers.
Following the crop distribution analysis, evapotranspiration (ET) data from the California Irrigation Management Information System (CIMIS) was applied to estimate monthly irrigation water requirements for each crop type. The following sections outline the methodology used to identify crop distribution, calculate ET-based irrigation demand, and evaluate the seasonal variability in water needs within the study area.
1.9.1.1 Crop Acreage Estimations
Using GIS, the crop mapping dataset was spatially extracted for each buffer zone (radius) and classified by crop type. The analysis of crop distribution within the buffer zones around the Santa Maria WWTP provides a detailed understanding of the dominant agricultural land uses in proximity to the facility. The extracted crop mapping data was categorized, and total acreages were calculated for each crop type in these defined radiuses (1-, 2-, and 5-mile buffers).
Table 1.10 summarizes the crop types and acreages identified within each buffer zone. Additionally, Figure 1.3 provides a closer look at Figure 1.2, illustrating the spatial distribution of crops within the 1- and 2-mile buffers. Both the table and figures show that through the entire 5-mile radius, truck, nursery, and berry crops remain the predominant agricultural types, defining the region's irrigation demand. With increasing distance, pasture and grain/hay crops occupy a minor portion of the land.
Table 1.10 Crop Acreages in 1-, 2-, and 5-Mile Buffers(1) Crop Type 1-Mile 2-Mile 5-Mile
Citrus and Subtropical 0 0 20
Grain and Hay Crops 0 49 620
Pasture 0 60 384
Truck Nursery and Berry Crops 1,795 7,136 25,657
Unclassified 25 25 172
Young Perennial 0 0 9
Notes:
(1) Source: Statewide i15 Crop Mapping Dataset, LandIQ.
WWTP
Last Revised: March 19, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 0.75 1.5
Miles
Disclaimer: Features shown in this
figure are for planning purposes and
represent approximate locations.
Engineering and/or survey accuracy
is not implied.
Data Sources: City of Santa Maria, ESRI,
California GIS
Figure 1.2 Statewide Crop Mapping Dataset (i15) With 1-, 2-, and 5-Mile Buffers
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
WWTP Santa Maria WWTP
Buffer Around WWTP
1-mile
2-miles
5-miles
2022 Provisional I15 Crop Mapping
Citrus and Subtropical
Grain and Hay Crops
Idle
Pasture
Truck Nursery and Berry
Crops
Urban Unspecified
Urban Landscape
Unclassified
Young Perennial
VOLUME 7 / CHAPTER 1: RECYCLED WATER FEASIBILITY PLAN
OCTOBER 2026 / FINAL / CAROLLO
WWTP
Last Revised: March 19, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 2,000 4,000
Feet
Disclaimer: Features shown in this
figure are for planning purposes and
represent approximate locations.
Engineering and/or survey accuracy
is not implied.
Data Sources: City of Santa Maria, ESRI,
California GIS
Figure 1.3 Statewide Crop Mapping Dataset (i15) With 1- and 2-Mile Buffer Showing Crop Distribution
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
WWTP Santa Maria WWTP
Buffer Around WWTP
1-mile
2-miles
2022 Provisional I15 Crop Mapping
Grain and Hay Crops
Idle
Pasture
Truck Nursery and Berry
Crops
Urban Unspecified
Unclassified
VOLUME 7 / CHAPTER 1: RECYCLED WATER FEASIBILITY PLAN
OCTOBER 2026 / FINAL / CAROLLO
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19
For the purposes of this study, only the truck, nursery, and berry crops were considered in the ET and irrigation demand analysis, as they constitute the dominant agricultural land use across the entire 5-mile radius.
1.9.1.2 Evapotranspiration and Crop Coefficients
ET is the sum of evaporation from the soil surface and transpiration from plants. It represents the total water loss from a cropped area, making it a key factor in determining irrigation demand. Accurate estimation of ET is essential, as it allows for precise calculation of how much water needs to be applied to maintain optimal crop growth.
For this study, ET is used to estimate irrigation demand by determining the amount of water lost that needs to be replenished through irrigation. Water loss occurs through two primary mechanisms:
Soil Evaporation (E): Water evaporates directly from the soil surface due to solar radiation, wind, and air temperature.
Plant Transpiration (T): Water is absorbed by roots, moves through plant tissues, and is released as vapor from leaf stomata.
Since irrigation must compensate for these water losses, ET is a fundamental parameter for irrigation planning.
The following assumptions are considered in this study:
Crop water demand is directly proportional to seasonal ET variations, requiring higher irrigation volumes in warm months.
No significant capillary rise from groundwater is assumed, meaning crops rely on applied irrigation rather than underground moisture sources.
Santa Maria's climate follows regional patterns defined by the CIMIS, which provides reference ET (ET₀) values specific to the location.
The CIMIS is a state-managed database that provides reference evapotranspiration (ET₀) values for different regions and the crop coefficients according to the stage of plant growth for different crop types.
ET₀ represents the ET rate from a well-watered grass reference crop and serves as the baseline for calculating crop-specific ET. Santa Maria falls within CIMIS Zone 5: Figure 1.4 from CIMIS shows the different CIMIS zones and their ET values on a map. Table 1.11 provides the monthly ET₀ values (in inches per month) for Zone 3 from January to December.
Table 1.11 Monthly ET₀ Values (Inches per Month) for Zone 3(1) Month ET₀ (in/month)
January 1.86
February 2.24
March 3.72
April 4.8
May 5.27
June 5.7
July 5.58
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Month ET₀ (in/month)
August 5.27
September 4.2
October 3.41
November 2.4
December 1.86
Notes:
(1) Source: CIMIS Reference Evapotranspiration Zoning Map.
1.9.1.3 Irrigation Demand Estimation
Each crop has a crop coefficient (Kc) that adjusts the reference ET₀ to reflect the specific water consumption characteristics of that crop. The relationship is given by the formula:
𝐸𝐸𝐸𝐸𝐸𝐸 � 𝑖𝑖𝑖𝑖
𝑑𝑑𝑑𝑑𝑑𝑑� = 𝐸𝐸𝐸𝐸𝐸𝐸 � 𝑖𝑖𝑖𝑖
𝑑𝑑𝑑𝑑𝑑𝑑� 𝑥𝑥 𝐾𝐾 (𝑢𝑢 𝑢𝑢𝑢𝑢𝑢𝑢𝑢𝑢𝑢𝑢)
Where:
Kc = crop coefficient (dimensionless)
ETo = Reference evapotranspiration (inches per day) that varies by Zone ETc = Crop-specific evapotranspiration (inches per day) The initial, midpoint, and final crop coefficients correspond to the various growth stages for each of the crop types. Table 1.12 presents the crop coefficients (Kc) for truck, nursery, and berry crops.
Table 1.12 Crop-Specific Kc Crop Coefficient Values(1)
Crop Type Kc (crop coefficient)
Kc ini Kc mid Kc end
TRUCK, NURSERY, AND BERRY CROPS
Strawberries 0.40 0.85 0.75
Lettuce 1.00 0.95
Broccoli 1.05 0.95
Cauliflower 1.05 0.95
Celery 1.05 1.00
Notes:
(1) Source: CIMIS.
(2) Kc initial, Kc mid, and Kc end are crop coefficients from CIMIS that represent water use during early growth (low ET), peak growth (high ET), and late season (declining ET), used to estimate crop ET.
Once ETc values are determined for each crop type, the water required to irrigate one acre in a day is calculated in AF/day or million gallons per day (mgd). The total irrigation demand for each buffer zone (1-mile, 2-mile, and 5-mile) is calculated by multiplying the per-acre irrigation demand by the total crop acreage in each radius. Figures 1.5, 1.6, and 1.7 illustrate the monthly irrigation demand for truck, nursery, and berry crops in the 1-mile, 2-mile, and 5-mile buffer zones. In these figures, month number 1 is January, month 2 is February, etc.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
For different truck, nursery, and berry crops, water requirements were calculated based on initial, mid, and final growth stage ET coefficients. The highest and lowest values across the months were used to define the maximum and minimum water demand.
Source: CIMIS.
Figure 1.4 CIMIS Reference Evapotranspiration Zone Classifications VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
Figure 1.5 Monthly Irrigation Demand Graph for 1-Mile Buffer Figure 1.6 Monthly Irrigation Demand Graph for 2-Mile Buffer
0.0 0.5
1.0 1.5
2.0 2.5
3.0 3.5
4.0 1 2 3 4 5 6 7 8 9 10 11 12
Water Demand (mgd)
Month
Demands: 1-mile Radius
Max Min
0.0 1.0
2.0 3.0
4.0 5.0
6.0 7.0
8.0 1 2 3 4 5 6 7 8 9 10 11 12
Water Demand (mgd)
Month
Demands: 2-mile Radius
Max Min
Area Irrigated = 1,820 acres
Peak Water Demand: 3.5 mgd (June)
Area Irrigated = 7,270 acres
Peak Water Demand: 7 mgd (June)
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.7 Monthly Irrigation Demand Graph for 5-Mile Buffer The estimated irrigation demand for truck, nursery, and berry crops within the 1-mile, 2-mile, and 5-mile buffer zones demonstrates a clear spatial and seasonal trend. As expected, water demand increases with distance from the WWTP, as larger agricultural areas require more irrigation. 1-mile radius - Total irrigated area: 1,820 acres, with a peak water demand of 3.5 mgd. 2-mile radius - Total irrigated area: 7,270 acres, with a peak water demand of 7.0 mgd. 5-mile radius - Total irrigated area: 26,862 acres, with a peak water demand that is significantly greater than 8.0 mgd.
For a 5-mile radius, the peak month irrigation demand exceeds the current average dry weather flow (8.0 mgd) of the WWTP, meaning the full 5-mile agricultural area would require more water than is produced by the facility in dry weather conditions.
Irrigation demand also exhibits strong seasonal variation, with higher demand during the drier months (spring and summer) and lower demand during the wetter months (fall and winter). Peak demand occurs in June, when ET rates are highest, requiring the maximum irrigation inputs. Since demand peaks in summer months, recycled water could be allocated strategically to support peak irrigation periods, optimizing the use of available supply.
Thus, agricultural irrigation presents a significant demand for recycled water, especially in the drier months. Also, the proximity of agricultural lands to the treatment plant minimizes the need for extensive infrastructure, making it one of the most viable options for Recycled Water Use.
0.0 2.0
4.0 6.0
8.0 10.0
12.0 14.0
16.0 18.0
20.0 1 2 3 4 5 6 7 8 9 10 11 12
Water Demand (mgd)
Month
Demands: 5-mile Radius
Max Min
Area Irrigated = 26,862 acres
Peak Water Demand: > 8 mgd (June)
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
1.10 Urban Reuse
1.10.1 Demand Analysis - Market Identification and Quantification The feasibility of urban recycled water reuse was evaluated by analyzing the non-potable water demand of in-City customers, including parks, golf courses, schools, cemeteries and other in-City users. The demand assessment was based on water consumption data provided by the City for the years 2018 through 2024, representing a multi-year dataset to capture variations in usage patterns and seasonal fluctuations.
To visualize the spatial distribution of urban water demand, the billing data was converted into a GIS-based layer, mapping individual customer demands across the City. In this spatial representation, larger demands were illustrated with proportionally larger circles, while smaller demands appeared as smaller circles. This approach allowed for a relative comparison of water use intensity across different urban sites. Figure 1.8 shows the spatial distribution of all the In-City demands. As shown, the potential demands are widely spread across the City.
1.10.1.1 Demands Estimation
After averaging water consumption data across the seven-year period (2018-2024), the total estimated demand for non-potable water use within the City was approximately 1 mgd. This value is relatively low compared to agricultural irrigation demand.
While recycled water can provide a sustainable alternative for non-potable urban applications, the scattered distribution of demand centers presents significant infrastructure challenges. Running a dedicated pipeline system to connect a large number of small and geographically dispersed customers would incur substantial infrastructure costs, which may not be justifiable given the limited total demand.
Also, the total non-potable urban demand of ~1 mgd is relatively low compared to available recycled water supply. While parks, golf courses, and other urban landscapes could potentially transition to recycled water, the high cost of extending distribution pipelines across a wide area outweighs the benefits of supplying such a relatively small demand.
Given these factors, urban reuse opportunities are limited primarily by economic and logistical constraints rather than by available supply. Future considerations for urban recycled water use would require a focused cost-benefit analysis, prioritizing large, concentrated demand centers that could justify infrastructure investment.
Santa Maria River
N Broadway
C uyama Hwy
US Highway 101
W Betteravia Rd
W Stowell Rd
Black Rd
E Stowell Rd
Mahoney Rd
O
rcutt Expy
W Main St
S Broadway
Santa Maria Way
US Highway 101
Santa Maria
Country Club
Santa Maria
Public Airport Tanglewood
Santa Maria
Union Valley Pkwy
Cabrillo Hwy
Rancho Maria
Golf Club
Santa Maria River
u ama Hwy
176
Rosemary
Rd E Betteravia Rd
Rosemary
Santa Maria
Last Revised: March 19, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 0.4 0.8
Miles
Cy
Figure 1.8 Spatial Distribution of Urban Water Demand
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
In-City Users Demand (MGD)
0 - 0.005
0.005 - 0.015
0.015 - 0.025
> 0.025
Santa Maria City Limits
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
1.11 Viable Reuse Users/Opportunities
While the Agricultural and Urban Demand Analysis provided an estimate of the total potential demand for recycled water in both agricultural and urban sectors, not all identified users are feasible for the recycled water supply. The high infrastructure costs associated with running pipelines across widely dispersed areas make it impractical to serve every potential user. This section focuses on identifying viable recycled water users, defined as locations where recycled water distribution is practical with minimal infrastructure investment and maximum water use efficiency.
In determining viable users, several factors were considered, including:
Proximity to the WWTP, as shorter pipeline routes reduce infrastructure costs. Ownership and Administrative feasibility, particularly in agriculture, where privately owned farmland requires agreements with individual farmers, whereas City-owned land does not, thus simplifying implementation.
Concentration of irrigable land, ensuring a single pipeline route can serve multiple users. Alignment of infrastructure needs between agricultural and urban users, optimizing distribution efficiency.
Based on these considerations, the following have been identified as viable recycled water users:
1. City-Owned Agricultural Land - A 233.6-acre City-owned property located near the treatment plant, of which 165.6 acres are available for irrigation. This represents an ideal starting point for recycled water implementation due to its close proximity to the facility, minimal infrastructure requirements, administrative ease, and immediate feasibility.
2. Urban Development Complex - Identified through discussions with City engineering staff, this site includes multiple irrigable areas, such as a future sports complex, Santa Maria Fair Park, and several school and athletic fields, with a total irrigable area of 41.6 acres. This concentrated urban area presents a logical opportunity for recycled water use, given its consistent irrigation demand, and it is a relatively close location to the WWTP, which provides potential for infrastructure optimization.
Additionally, agricultural lands and urban users along the potential pipeline route would be considered.
These areas would be cost-effective additions to a distribution system, as they would not require significant pipeline extensions beyond the planned infrastructure.
1.11.1 City-Owned Agricultural Land
The City-owned agricultural land adjacent to the Santa Maria WWTP consists of 233.6 acres, making it a logical site for potential recycled water irrigation. After allocating space for essential infrastructure, including six percolation ponds, solar arrays, a stockpile area, and roads, the total irrigable land available for agricultural use is approximately 165.6 acres. The layout of the City-owned land is shown in Figure 1.9.
Given its proximity to the treatment facility, this land presents a low-cost, high-feasibility option for implementing recycled water reuse in agricultural irrigation.
Since this land is used for agricultural use, the irrigation demand calculation assumes truck, nursery, and berry crops, aligning with the dominant crop types in the Santa Maria region. Using ET and crop VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
coefficient (Kc) values from CIMIS for berry crops, the peak water demand for the City-owned agricultural land was calculated.
Total irrigable acreage: 165.6 acres.
Peak monthly irrigation demand (June): 0.9 mgd.
Figure 1.10 shows the monthly irrigation demand graph for this land. This 0.9 mgd peak demand represents a reasonable use of recycled water, making the City-owned agricultural land a potentially viable initial user for recycled water.
Figure 1.9 Layout of City-Owned Agricultural Land
The City-owned agricultural land is a logical starting point for recycled water implementation:
Minimal Infrastructure Requirements: Located adjacent to the WWTP, this land requires little to no pipeline extension, significantly reducing capital and operational costs for distribution. Administrative Ease: Unlike privately owned farmlands that require agreements and coordination with multiple farmers, this land is under City jurisdiction, allowing for immediate implementation without regulatory or contractual hurdles. While the City leases the land to a farmer, a condition of the lease could be that they use recycled water.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
Moderate, Consistent Demand: With a peak month irrigation demand of 0.9 mgd, this land alone could utilize a moderate portion of the available recycled water supply to provide a steady, predictable water consumption.
Demonstration Potential for Future Expansion: Successfully implementing recycled water use on City-owned land can serve as a model for future expansion, demonstrating effective water reuse strategies and encouraging broader adoption by private agricultural users.
Figure 1.10 Monthly Irrigation Demand Graph for City-Owned Agricultural Land
1.11.2 Urban Development Complex
Through discussions with City engineering staff, a potential urban development complex was identified as a viable candidate for recycled water irrigation. In addition to this new development, there are other urban users nearby that could also be served. Figure 1.11 shows the complex along with the irrigable areas estimated. This area includes multiple urban land uses with landscape irrigation needs, including:
Future Sports Complex (4.9 irrigable acres, estimated from City-provided detailed plans). Santa Maria Fair Park (8.8 irrigable acres, estimated using Google Earth). Soccer Field (13.9 irrigable acres, estimated using Google Earth). Baseball Field (9.9 irrigable acres, estimated using Google Earth). Santa Maria High School (4.1 irrigable acres, estimated using Google Earth). The football field is not included, as it is artificial turf.
0.00 0.10
0.20 0.30
0.40 0.50
0.60 0.70
0.80 0.90
1.00 1 2 3 4 5 6 7 8 9 10 11 12
Water Demand (mgd)
Month
Water Demand: City Owned Ag Land Irrigation
Max Min
Area Irrigated = 165.5 acres
Peak Water Demand: 0.9 mgd (June)
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
The total irrigable area for these urban users is 41.6 acres, representing a decently concentrated reuse opportunity area in Santa Maria.
The irrigation demand for this urban development complex was estimated using CIMIS-based ET calculations, with different methodologies applied to landscape irrigation areas and turf-based areas.
1.11.2.1 Future Sports Complex (Landscape Irrigation Methodology) Landscape irrigation is calculated using a specific CIMIS methodology different from agricultural or turf-based irrigation. Instead of using a crop coefficient (Kc), the landscape coefficient (KL) is applied, which accounts for variations in plant type, density, and microclimate. In many cases, landscape irrigation customers use less water than necessary because of conservation practices and cost considerations.
Conversely, some customers over-irrigate because of uneven sprinkler coverage or overly conservative watering practices. Therefore, expected landscape irrigation requirements were calculated based on ET and rainfall data. Calculated irrigation requirements, as defined below, were used to estimate irrigation use.
The amount of irrigation required for the potential irrigation customers is directly dependent on precipitation quantities in the region. To calculate the amount of ET occurring in the study area, the following formula was used:
𝐸𝐸𝐸𝐸𝐿𝐿 = 𝐾𝐾𝐿𝐿 × 𝐸𝐸𝐸𝐸0
Where:
𝐸𝐸𝐸𝐸𝐿𝐿 = Evapotranspiration of landscaped areas (in inches) 𝐾𝐾𝐿𝐿 = Landscaped area crop coefficient
𝐸𝐸𝐸𝐸0 = Reference evapotranspiration (in inches)
The reference Evapotranspiration was obtained from the CIMIS Evapotranspiration zoning map as described before.
S
Railroad Ave
W Mariposa Way W Mariposa Way
Pershing St Pershing St Superior
St
W Camino Colegio
Liberty St
S Blosser Rd
W Battles Rd
W Stowell Rd
Adam Park
Minami Park
S Thornburg St
E Morrison Ave
Speed
St
Has
m Dr
Santa Barbara
County
Fairgrounds
Wilson Gym
Santa Maria
Inn
135
W Enos Dr
W Battles Rd
E Enos Dr
Wallis Ave
Edward St Plaza Dr
Windsor St
Lincoln St
S Walnut Dr
W Stowell Rd E Stowell Rd
S Broadway
Santa Maria
Shopping
Center
Adam
Elementary
Minami
Community
Center
Sanchez Inc.
Tax &
Immigration
Services
Launderland
Taqueria La
Coqueta
Vallarta
Roble S
Issac M
Element
Schoo
S Miller St
S Miller St
E Enos
Ea
g
le
St
E
agle
Ct Barcellus A
Marian M
Center
Last Revised: December 08, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 375 750
Feet
Figure 1.11 Map of Urban Development Complex Showing the Total Irrigable Area for the Different Urban Users
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Baseball Field
SM Fair Park
SMHS Baseball Field
SMHS Soccer Field
Soccer Field
Sports Complex (Future)
SM High School
SM Fair Park
Sports Complex
(Future)
Soccer Field
Baseball Field
Total Irrigable Area
4.13 Ac
6.14 Ac
4.9 Ac
13.9 Ac
9.9 Ac
43.62 Ac
VOLUME 7 / CHAPTER 1: RECYCLED WATER FEASIBILITY PLAN
OCTOBER 2026 / FINAL / CAROLLO
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
To calculate landscape ET, the landscaped area crop coefficient was estimated using information contained in the Guide to Estimating Irrigation Water Needs of Landscape Plantings in California by the California DWR. The landscaped area crop coefficient is the product of an average species factor (𝑘𝑘𝑠𝑠), density factor (𝑘𝑘𝑑𝑑), and microclimate factor (𝑘𝑘𝑚𝑚𝑚𝑚). The landscape coefficient was then multiplied by the reference ET to determine the average landscape ET for the study area. The landscape coefficient is determined as:
𝐾𝐾𝐾𝐾 = 𝑘𝑘𝑠𝑠 × 𝑘𝑘𝑑𝑑 × 𝑘𝑘𝑚𝑚𝑚𝑚
Where:
ks = Species Factor (0.8, assuming multiple plant species) kd = Density Factor (1.0, assuming average density)
kmc = Microclimate Factor (1.0, assuming open field conditions) Thus, the final value KL for the future sports complex is 0.8.
1.11.2.2 Soccer Field, Baseball Field, Santa Maria High School, and Santa Maria Fair Park (Turf-Based Irrigation Methodology)
For all turf-based areas, the standard CIMIS methodology described previously using ET values and crop coefficients (Kc) as outlined in Section 1.9, Agricultural Reuse, was applied. Table 1.13 lists the Kc values that were used for turf grass.
Table 1.13 Turf Grass Kc Crop Coefficient Values (From CIMIS) Crop Type Kc ini Kc mid Kc end
Turf Grass 0.85 0.90 0.10
1.11.2.3 Total Irrigation Demand and Seasonal Variability Using these methods, the total irrigation demand was calculated, with separate demand values for landscape and turf-based areas. The peak irrigation demand occurs in the summer months, consistent with higher ET rates during dry seasons. Figure 1.12 shows the total monthly irrigation demand for the urban development complex.
Total irrigable acreage: 41.6 acres.
Peak monthly irrigation demand (June): 0.19 mgd.
The peak month irrigation demand for the combined urban users is estimated at 0.19 mgd, which, while contributing to overall recycled water use, is not a particularly high demand compared to agricultural alternatives. However, the feasibility of serving these urban users will ultimately depend on infrastructure costs and distribution efficiency, which will be further evaluated in later sections of the analysis.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Figure 1.12 Monthly Irrigation Demand Graph for Urban Development Complex
1.12 Project Alternatives Analysis
To evaluate the feasibility of implementing a recycled water distribution system in Santa Maria, four alternatives were developed, each representing a phased expansion approach. These alternatives range from a small-scale system serving only the City-owned agricultural land to an expanded network incorporating additional agricultural and urban users. The goal of this analysis is to compare the different alternatives in terms of infrastructure requirements, irrigated acreage, and water demand, so that recycled water implementation is both cost-effective and practical.
The four alternatives considered are:
Alternative 1 - Recycled water is supplied only to the City-owned agricultural land adjacent to the treatment plant.
Alternative 2 - Builds upon Alternative 1 by expanding to additional agricultural users located along a potential pipeline route.
Alternative 3 - Extends further to serve the identified urban development complex, in addition to the City-owned and feasible agricultural lands.
Alternative 4 - Serving City-owned agricultural land, additional agricultural users, the urban development complex, and a couple other viable urban users located along the pipeline corridor.
This phased approach allows for incremental implementation, enabling the system to start on a small, manageable scale while maintaining flexibility for future expansion as demand and infrastructure investments grow.
0.000
0.050
0.100
0.150
0.200
0.250
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Water Demand (MGD)
Total Water Demand
Area Irrigated = 41.61 acres
Peak Water Demand: 0.19 mgd (June)
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
1.12.1 Pipeline Routing and Sizing
A pipeline network was designed using hydraulic principles to determine optimal pressures and flow rates while also minimizing infrastructure costs. Key considerations in pipeline routing included:
Prioritizing access to viable users - The pipeline was aligned to maximize service coverage for agricultural and urban users while keeping the system as efficient as possible. Utilizing major public roads where feasible - To simplify installation and reduce disruption, pipeline routes were primarily planned along existing roadways and public rights-of-way whenever possible. Minimizing pipeline length while maintaining accessibility - The routing was optimized to balance minimal infrastructure investment with practical serviceability.
Pipeline sizing was determined based on water demand calculations for each alternative, with larger trunk lines supplying primary distribution points for high-capacity conveyance and smaller lateral lines branching out to individual users. A key factor influencing pipeline sizing is the irrigation schedule, which significantly impacts peak demand. The design assumes irrigation occurs three days per week for eight hours per day, leading to peak flow rates much higher than the average daily demand. As a result, the pipeline is not sized for a single maximum gross volume but rather for the peak hourly flows dictated by the irrigation schedule.
Each alternative is presented as a separate system which has a unique pipeline configuration based on the users it serves and the total anticipated demand. The following sections provide a detailed breakdown of each alternative, including pipeline routes, total irrigated area, maximum month demand, and infrastructure considerations. Additionally, peak hourly flows will be included in the tables, as these values control the pipe sizing.
1.12.2 Alternative 1
Alternative 1 represents the most basic implementation of the recycled water distribution system, focusing exclusively on irrigating the City-owned agricultural land adjacent to the WWTP. This alternative requires the shortest pipeline length and minimal infrastructure, making it the most cost-effective and easiest to implement among the four alternatives. The pipeline routing was designed to efficiently connect the treatment plant to the City-owned agricultural land while maintaining optimal pressure and flow rates. The routing primarily follows existing public roads for the main trunk line, while laterals extend into agricultural fields, crossing undeveloped land as needed. Figure 1.13 shows the proposed pipeline route for Alternative 1.
1.12.2.1 Pipeline Specifications
Table 1.14 presents the proposed pipeline specifications for Alternative 1. As noted in the table, although the maximum month demand is only 0.9 mgd, the peak hourly flow is 6.28 mgd, which governs the diameter of the trunk pipeline. A 20-inch trunk line would be required in this case.
Table 1.14 Alternative 1: Pipeline Specifications
Parameter Alternative 1: City-Owned Agricultural Land
Total Irrigated Area 165.6 acres
Maximum Month Demand 0.9 mgd (June)
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
Parameter Alternative 1: City-Owned Agricultural Land
Peak Hourly Flow 6.28 mgd
Total Pipeline Length 1.6 miles
Pipeline Diameters 20-inch trunk line (1.2 miles along Black Road and W Stowell Road). 16-inch lateral pipeline (0.2 miles into agricultural land from Black Road to the east, parallel to W Stowell Road).
12-inch lateral pipeline (0.2 miles into agricultural land from W Stowell Road to the south, parallel to Black Road).
Pipeline 2
12" 0.2 Miles
Pipeline 1
16" 0.2 Miles
Trunk Line
20" 1.2 Miles
E St
Stowell Rd
Prandini Way
Black Rd
W Stowell Rd
Last Revised: April 17, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 500 1,000
Feet
VOLUME 7 / CHAPTER 1: RECYCLED WATER FEASIBILITY PLAN
OCTOBER 2026 / FINAL / CAROLLO
Figure 1.13 Pipeline Route: Alternative 1
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Reclaimed Pipeline by Diameter
12"
16"
30"
City Owned Ag
SM WW Treatment Plant
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
1.12.3 Alternative 2
Alternative 2 uses the routing from Alternative 1 as a starting point but expands further east by incorporating additional feasible agricultural land along the pipeline route. This alternative extends the pipeline network beyond the City-owned agricultural land to serve privately owned agricultural parcels that are positioned along a logical extension of the pipeline corridor to the east. The goal is to maximize agricultural recycled water use while maintaining cost-effective infrastructure expansion. If this alternative were to be constructed in phases then the initial phase, which might match Alternative 1 would need to incorporate the trunk line sizing appropriate for built out of Alternative 2. The main trunk line follows Black Road and W Stowell Road, similar to Alternative 1, but extends further eastward to connect additional agricultural users. The laterals branch off into the fields, providing efficient distribution while avoiding unnecessary road crossings. Figure 1.14 shows the pipeline route for Alternative 2.
1.12.3.1 Pipeline Specifications
Table 1.15 shows the infrastructure needs for Alternative 2. As shown, the peak hour flow in this case would be 10.83 mgd, requiring a larger diameter trunk pipeline, now 24 inches. As noted above, if this alternative were to be phased, the initial phase would require installing the 24-inch trunk pipeline to provide the necessary size to meet the ultimate peak hourly flow of this Alternative.
Table 1.15 Alternative 2: Pipeline Specifications
Parameter Alternative 2: City-Owned Agricultural Land + Other Feasible Agricultural Land Total Irrigated Area 286 Ac
Maximum Month Demand 1.55 mgd (June)
Peak Hourly Flow 10.83 mgd
Total Pipeline Length 3 miles
Pipeline Diameters 24-inch trunk line (1.2 miles along Black Road and W Stowell Road. 16-inch reduced trunk line (0.8 miles extending eastward into W Stowell Road). 16-inch lateral pipeline (0.2 miles into agricultural land from Black Road to the east, parallel to W Stowell Road).
Four 12-inch lateral pipelines (each 0.2 miles into agricultural land from W Stowell Road to the south and north parcels, parallel to Black Road).
Pipeline 2
12" 0.2 Miles
Pipeline 5
12" 0.2 Miles
Pipeline 4
12" 0.2 Miles
Pipeline 3
12" 0.2 Miles
Pipeline 1
16" 0.2 Miles
Reduced Trunk Line
16" 0.8 Miles
Trunk Line
24" 1.2 Miles
Kameo St S Irving Ln
S Tulane Ct
S Penn Ct
W Main St
S Fulton Ct
White Ct
W Hartford
Way
A St
Beacon
Way
E St
la Brea
Ave
Stowell Rd
Prandini Way
Hanson Way
Black Rd
W Stowell Rd
Last Revised: December 08, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 500 1,000
Feet
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
Figure 1.14 Pipeline Route: Alternative 2
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Reclaimed Pipeline by Diameter
12"
16"
30"
City Owned Ag
SM WW Treatment Plant
Other Feasible Agriculture
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-38
1.12.4 Alternative 3
Alternative 3 is a larger project and builds upon the same routing as Alternative 2 by extending the recycled water pipeline further east to serve the identified urban development complex, which includes the future sports complex, Santa Maria Fair Park, soccer and baseball fields, and Santa Maria High School.
This marks the first integration of urban users into the system, expanding the scope of recycled water use beyond agriculture.
The pipeline routing follows an eastward extension from the agricultural lands toward urban reuse sites, to provide efficient distribution with minimal additional infrastructure costs. The main trunk line follows Black Road and W Stowell Road, then extends further along W Stowell Road all the way into urban areas.
Laterals branch off to reach individual urban users, such as sports fields and schools. Figure 1.15 shows the pipeline route for Alternative 3.
While the routing follows the same primary infrastructure corridors established in previous alternatives, similar to Alternative 3, the demands of chosen urban users are small (0.2 mgd) compared to the added infrastructure (2 miles) necessary to supply recycled water to these users. The infrastructure costs associated with these extensions may outweigh the benefits of supplying the relatively minor additional demand.
1.12.4.1 Pipeline Specifications
For this alternative, the peak hourly flow has increased to above 12 mgd, which now requires a 30-inch trunk line.
Table 1.16 Alternative 3: Pipeline Specifications
Parameter Alternative 3: (City-Owned + Other Feasible) Agricultural Land + Urban Development Complex
Total Irrigated Area 328 acres
Maximum Month Demand 1.73 mgd (June)
Peak Hourly Flow 12.11 mgd
Total Pipeline Length 5.05 miles
Pipeline Diameters 30-inch trunk line (1.2 miles along Black Road and W Stowell Road). 16-inch reduced trunk line (0.8 miles extending eastward into W Stowell Road). 12- inch reduced trunk line (1.5 miles extending eastward into City: W Stowell Road). 16-inch lateral pipeline (0.2 miles into agricultural land from Black Road to the east, parallel to W Stowell Road).
Four 12-inch lateral pipelines (each 0.2 miles into agricultural land from W Stowell Road to the south and north parcels, parallel to Black Road). Two 8-inch lateral pipelines (0.35 and 0.2 miles into urban development from W Stowell Road).
Similar to Alternative 2, Alternative 3 could be constructed in phases and represents a significant step forward, integrating both agricultural and urban users, but it also introduces new infrastructure and operational challenges. Since urban irrigation involves smaller, more scattered users, additional pressure monitoring and potential regulation mechanisms may be required.
Pipeline 7
8" 0.2 Miles
Pipeline 2
12" 0.2 Miles
Pipeline 5
12" 0.2 Miles
Pipeline 4
12" 0.2 Miles
Pipeline 3
12" 0.2 Miles
Pipeline 1
16" 0.2 Miles
Pipeline 6
8" 0.35 Miles
Reduced Trunk Line
16" 0.8 Miles
Trunk Line
30" 1.2 Miles
Reduced Trunk Line
12" 1.5 Miles
W Cook St
Pine St
Blosser Rd S Blosser Rd
W Church St
S Western Ave Western Ave
Hanson Way
W Stowell Rd
W Stowell Rd
W Morrison
Ave
W Fesler St
Morrison Ave
Blosser Rd S Blosser Rd
W Main St
W Main St
State Rte 166
State Rte 166
Battles Rd
S Depot St
S Broadway S Broadway
Black Rd
State Rte
135
State
Rte 135
Last Revised: December 08, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 1,000 2,000
Feet
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
Figure 1.15 Pipeline Route: Alternative 3
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Reclaimed Pipeline by Diameter
8"
12"
16"
30"
Baseball Field
City Owned Ag
SM Fair Park
SM WW Treatment Plant
SMHS Baseball Field
SMHS Soccer Field
Soccer Field
Sports Complex (Future)
Other Feasible Agriculture
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-40
1.12.5 Alternative 4
Finally, Alternative 4 extends the concept of the prior alternatives by integrating both agricultural and urban users and incorporating two additional urban users, and by extending the pipeline further to reach these additional urban sites.
The pipeline routing follows a logical extension of the infrastructure established in Alternative 3. The main trunk line follows Black Road and W Stowell Road, extends eastward to serve urban development sites, and then further expands to reach additional urban users located along the corridor. Figure 1.16 shows the pipeline route for Alternative 4.
While the routing follows the same primary infrastructure corridors established in previous alternatives, similar to Alternative 3, the demands of chosen urban users are disproportionately small (0.02 mgd) compared to the added infrastructure (0.35 miles) necessary to supply recycled water to these users. The infrastructure costs associated with these extensions may outweigh the benefits of supplying the relatively minor additional demand.
1.12.5.1 Pipeline Specifications
As indicated in Table 1.17, the diameter of the initial trunk main remains at 30 inches for this alternative, due to the minimal increase in the peak hourly demand flow, but the overall pipeline length, for all diameters, increases to 5.4 miles.
Table 1.17 Alternative 4: Pipeline Specifications
Parameter Alternative 4: City-Owned Agricultural Land + Other Feasible Agricultural Land + Urban Development Complex + 2 Urban Users
Total Irrigated Area 328 acres + 2 urban users
Maximum Month Demand 1.75 mgd (June)
Peak Hourly Flow 12.26 mgd
Total Pipeline Length 5.4 miles
Pipeline Diameters 30-inch trunk line (1.2 miles along Black Road and W Stowell Road). 16-inch reduced trunk line (0.8 miles extending eastward into W Stowell Road). 12-inch reduced trunk line (1.5 miles extending eastward into City: W Stowell). 16-inch lateral pipeline (0.2 miles into agricultural land from Black Road to the east, parallel to W Stowell Road).
Four 12-inch lateral pipelines (each 0.2 miles into agricultural land from W Stowell Road to the south and north parcels, parallel to Black Road). Two 8-inch lateral pipelines (each 0.2 miles into urban development from W Stowell).
In fact, none of the urban users present a viable option for recycled water integration due to their extremely low individual demands and highly scattered distribution. The infrastructure cost required to extend pipelines to these users would be significantly higher and outweigh any benefit from the volume of recycled water they would consume, making the investment economically impractical. Prioritizing urban reuse does not present a logical or cost-effective strategy for the recycled water supply system at this time.
Pipeline 7
8" 0.2 Miles
Pipeline 2
12" 0.2 Miles
Pipeline 5
12" 0.2 Miles
Pipeline 4
12" 0.2 Miles
Pipeline 3
12" 0.2 Miles
Pipeline 1
16" 0.2 Miles
Pipeline 6, 8" 0.35 Miles
Reduced Trunk Line
16" 0.8 Miles
Trunk Line
30" 1.2 Miles
Reduced Trunk Line
12" 1.5 Miles
W Cook St
Pine St
Blosser Rd S Blosser Rd
W Church St
W el Camino St
S Western Ave Western Ave
Hanson Way
W Stowell Rd W Stowell Rd
W Morrison
Ave
W Fesler St
el Camino St
Blosser Rd S Blosser Rd
W Main St
W Main St
Morrison Ave
State Rte 166
State Rte 166
Battles Rd
S Depot St
S Broadway S Broadway
Black Rd
State Rte 135
State
Rte 135
Last Revised: December 08, 2025 pw:\\IO-PW-INT.Carollo.local:Carollo_200000\Documents\CA\Santa Maria\202301-000000\02 Project Information\03 Data\Santa_Maris_202301.APRX O
0 1,000 2,000
Feet
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
Figure 1.16 Pipeline Route: Alternative 4
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Baseball Field
City Owned Ag
SM Fair Park
SM WW Treatment Plant
SMHS Baseball Field
SMHS Soccer Field
Soccer Field
Sports Complex (Future)
Other Feasible Agriculture
Reclaimed Pipeline by Diameter
8"
12"
16"
30"
Pipeline 8
6" 0.35 Miles
823 Morrison Ave
(irrigation) - 0.001 MGD
SM Elementary
School - 0.205 MGD
Note 0.35 Miles of extra
pipeline for a total of
0.0215 MGD Demand
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-42
Table 1.18 summarizes the various parameters of the 4 alternatives discussed above. Each alternative represents a progressively larger project, extending along the same/similar pipeline routing. All alternatives, except for Alternative 1, could be phased.
Table 1.18 Alternative Parameter Summary
Parameter Alternative 1 Alternative 2 Alternative 3 Alternative 4 Irrigation Demand (AFY) 1,008 1,736 1,938 1,960
Total Irrigated Area (acres) 165.6 286 328 328 + 2 users Pipeline Diameters (inches) 12 - 20 12 - 24 8 - 30 8 - 30 Total Pipeline Length (miles) 1.6 3 5.05 5.4
1.13 Planning and Design Assumptions
The alternatives for the City's recycled water system were developed using the planning and design criteria defined in this chapter. The developed criteria address the recycled water system capacity, pipe roughness, maximum velocity, minimum velocity, maximum head loss, and demand factors.
The planning and design criteria are presented in Table 1.19. A discussion of several of these criteria follows.
Table 1.19 Planning and Design Criteria
Parameter Value/Assumption
Minimum Pressure at Distribution Points 40 - 60 psi
Pipeline Material PVC (assumed)
Pipeline Sizing Basis Peak Month Demand
Acceptable Head Loss 8 feet/1,000 feet length of pipe
Hazen-Williams C-Factor 120
Maximum Pipeline Velocity 5 feet per second
Minimum Pipeline Velocity 2 feet per second
Irrigation Schedule 3 days a week, 8 hours per day
Notes:
psi - pounds per square inch; PVC - polyvinyl chloride
1.14 Key Infrastructure Components
In addition to the pipeline network, the recycled water distribution system requires several critical infrastructure components to provide efficient operation, compliance with regulations, and reliable delivery to end users. These components include booster pump stations, storage reservoirs, and treatment upgrades for Title 22 compliance.
1.14.1 Booster Pump Stations
Since the system operates as a pressurized distribution network, booster pump stations are necessary to maintain sufficient pressure and flow throughout the pipeline system. The pump station(s) will be strategically located so that both agricultural and urban users receive the required pressure for irrigation.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-43
The size of a pump station is determined by several key factors, including the total system head requirements, flow rate demands, and overall efficiency of the pumping system. The goal is for the system to operate efficiently while delivering the necessary water pressure to all users, whether agricultural or urban.
The first step in sizing a pump station is determining the total dynamic head (TDH) required to move water from the treatment plant to the furthest point in the distribution system. This consists of two main components:
The static head, which accounts for elevation differences and required end-of-line pressure. The friction head loss, which is caused by the movement of water through the pipes.
The Hazen-Williams equation is commonly used to estimate friction losses in pipelines, factoring in pipe diameter, material, flow rate, and length. As indicated in Table 1.19, a Hazen-Williams coefficient (C) of 120 was assumed, representing typical conditions for PVC pipelines. For the purposes of this study, the pump stations were sized to maintain a minimum pressure of 60 psi at distribution points, to satisfy irrigation performance for all users. To maintain efficient system operation, an acceptable head loss threshold of 8 feet per 1,000 feet of pipeline was used as a guideline.
Once the total system head is determined, the next factor in pump station sizing is flow rate (Q). The required flow is based on the peak monthly irrigation demand, to enable the system to deliver adequate water even under high-demand conditions. For the purposes of sizing in Table 1.20, Q represents the design flow rate based on average operational conditions, assuming three irrigation days per week and eight hours of daily operation. This method yields a representative design flow rate for normal operating conditions, allowing the system to operate efficiently without oversizing for short-duration peak flows.
The flow rates presented in Table 1.20 reflect this calculated operational demand.
It is important to note that these design flows do not represent peak hour demands. Actual peak hour demands, particularly for larger alternatives, are significantly higher. These peak flows will be met using multiple pumps operating in parallel. The pumps must not be oversized for typical operation, but still be able to meet peak demand periods without excessive strain on the system. Multiple pumps will be used to deliver the peak flow rates.
With both head and flow requirements established, the pump station's horsepower (hp) requirement is calculated. The pump hp required for each alternative was calculated using the standard water horsepower equation, which accounts for flow rate (Q), total dynamic head (H), and pump efficiency (η). ℎ𝑝𝑝 = 𝑄𝑄 × 𝐻𝐻
3,960 × η
Where:
hp = Required pump horsepower
Q = Flow rate in gpm
H = Total dynamic head in feet (sum of static head and friction loss) 3,960 = Conversion factor for water horsepower
η = Pump efficiency (assumed to be 75 percent)
An assumed pump efficiency of 75 percent (0.75) was used in these calculations to reflect real-world energy losses in the system. As the pipeline network expands, higher head losses and increased flow rates VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-44
result in larger pump station capacities. Table 1.20 shows the pump station sizing for each of the four scenarios.
Table 1.20 Pump Station Sizing Requirements
Case Head Loss
(feet)
Pump Station Head
Required (feet) Q (gpm)(1) Pump (hp)
Alternative 1 20 158 687 37
Alternative 2 97 236 1,187 94
Alternative 3 89 227 1,340 103
Alternative 4 91 230 1,354 105
Notes:
(1) Flow rates (Q) represent average design flows under assumed irrigation schedules (3 days/week, 8 hours/day). Peak hour demands will be met using multiple pumps operating simultaneously. Final pump configuration and sizing would be determined during preliminary design and will be based on a peak demand analysis and operational flexibility.
From the analysis, it is evident that larger-scale alternatives require significantly greater pump capacity.
The required horsepower increases as more users are connected, which directly impacts operational costs and energy consumption. Smaller alternatives, such as those serving only agricultural users, are generally more energy-efficient and cost-effective, whereas urban expansions require higher pumping power due to extended pipeline lengths and additional pressure demands.
1.14.2 Reservoir: Storage
A storage reservoir is a critical component of the recycled water distribution system, providing operational flexibility, supply reliability, and buffering capacity to accommodate fluctuations in demand. Sizing and requirements for storage will be determined based on:
Peak irrigation demand (to buffer daily fluctuations in usage). Operational needs (to regulate flow and pressure in the system). Emergency storage (to provide backup supply in case of system disruptions).
In this study, a pond is assumed as the primary storage facility, offering a cost-effective and practical approach to managing the availability of recycled water. The storage volume is determined based on daily demand and system requirements, with a design assumption of 0.5 to 1 day of storage capacity to balance operational efficiency with infrastructure feasibility.
Irrigation demand fluctuates throughout the day, with peak usage periods occurring during designated irrigation windows. Having at least half a day of storage means that water is available when needed, even if immediate production from the treatment plant is insufficient to meet peak demands. A full day's worth of storage provides an added buffer, accommodating variability in daily demand, potential operational interruptions, or maintenance activities. This range allows for flexibility in system operation without requiring excessive storage infrastructure.
To estimate the required storage volume, daily demand values for each alternative were used to determine the total water needed to sustain the system for 0.5 and 1.0 days. The storage volume was then converted to AF to assess the pond size required to hold this capacity. Table 1.21 lays out the storage capacity requirements for each of the 4 alternatives.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-45
Table 1.21 Storage Capacity Requirements
Case Daily Demand (mgd) 0.5-Day Storage
(MG)
1-Day
Storage (MG)
0.5-Day
Storage (AF)
1-Day
Storage (AF)
Alternative 1 0.90 0.5 0.9 1.4 2.8
Alternative 2 1.55 0.8 1.6 2.4 4.8
Alternative 3 1.73 0.9 1.8 2.7 5.4
Alternative 4 1.75 0.9 1.8 2.7 5.4
Notes:
MG - million gallons
Another important assumption in storage design is the depth of the pond, which is set at 10 feet. This depth is a reasonable industry standard for recycled water storage ponds, providing a balance between minimizing land area requirements and ensuring adequate water turnover to maintain water quality.
A shallow pond would require a much larger surface area, increasing land acquisition costs and potential evaporation losses, while a deeper pond could introduce challenges related to mixing, circulation, and aeration. The 10-foot depth assumption ensures efficient storage without excessive land use or water stagnation issues.
To determine the surface area required for the pond, the following formula was used:
𝑆𝑆 𝑆𝑆𝑆𝑆 𝐴𝐴 ( ) =
𝑆𝑆 𝑆𝑆 𝑆𝑆 𝑉𝑉 𝑉𝑉 ( − )
𝑃𝑃 𝐷𝐷 ℎ ( )
Applying this calculation to each alternative, the estimated surface areas were determined based on the
0.5-day and 1-day storage scenarios. These values provide insight into the land area requirements for storage pond construction, helping to assess the feasibility of integrating a pond within the available site constraints. Table 1.22 presents a summary of the surface area required for the storage ponds, assuming a 10-foot water depth.
Table 1.22 Estimated Pond Surface Areas
Case 0.5-Day Storage (acres) 1-Day Storage (acres)
Alternative 1 0.1 0.3
Alternative 2 0.2 0.5
Alternative 3 0.3 0.5
Alternative 4 0.3 0.5
1.14.3 Treatment Process Requirements for Title 22 Compliance To meet California Title 22 recycled water regulations, the system requires filtration and disinfection to ensure that water quality meets the standards for agricultural and urban irrigation reuse.
Filtration and Disinfection:
Filtration is necessary to reduce particle load and provide compliance with turbidity standards. Disinfection (UV or chlorine treatment) can be used to eliminate pathogens and meet regulatory requirements. For this evaluation, UV disinfection was incorporated as the primary disinfection method for compliance with Title 22 regulations.
VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-46
1.15 Planning Level Cost Estimates
The cost evaluation for implementing the recycled water distribution system includes key infrastructure components such as pipeline installation, pump stations, storage reservoirs, tertiary filtration, and UV treatment facilities. The estimated costs vary across the four alternatives, reflecting differences in pipeline length, infrastructure complexity, and additional urban expansion requirements. If tertiary filtration is not included as part of the planned plant expansion project, then the costs presented below would have to be increased to include tertiary filtration.
The cost estimates presented in this chapter have been prepared for general master planning purposes and for guidance in project evaluation and implementation. The actual costs of a project will depend on actual labor and material costs, competitive market conditions, final project scope, implementation schedule, and other variable factors such as preliminary alignment generation, detailed utility surveys, and environmental and local considerations.
The AACE International defines an order-of-magnitude estimate for master plan studies as an approximate estimate made without detailed engineering data. This section presents the assumptions used in developing order of magnitude cost estimates for recommended facilities. The budgeting level estimates needed for planning purposes and CIPs are usually based on Class 5. It is normally expected that an estimate of this type would be accurate on the low side between -20 percent to -50 percent and on the high side between +30 percent to +100 percent.
For the development of project costs, costing factors including contingency and other markups will be applied consistent with Volume 2, Chapter 6 Cost Estimating Procedures of the Master Plan.
Table 1.23 summarizes the preliminary estimates for construction capital costs for each alternative. Cost estimates do not account for Operations and Maintenance costs. These estimates include a 30-percent contingency and allowances as shown. As can be seen, the bulk of the facilities sub-total cost (about 80 percent) is attributed to the storage, pumping, and conveyance facilities for the recycled water system.
The lowest cost alternative would be Alternative 1, with a construction cost of about $26 million, and the other three alternatives get progressively more expensive due to the additional pipeline costs. A more detailed breakdown of the cost estimate, including allowances for engineering and construction management, etc., to arrive at an overall Project Cost, are shown in Appendix A.
Table 1.23 Summary of Preliminary Cost Estimates
Description % Alternative 1 Alternative 2 Alternative 3 Alternative 4 Reuse Facilities
UV System (1 mgd / 2 mgd) $520,000 $800,000 $800,000 $800,000 Tertiary Filtration (1 mgd / 2 mgd) $330,000 $415,000 $415,000 $415,000 Recycled Water Pipelines $6,341,280 $11,742,720 $18,445,680 $19,147,920 Recycled Water Pump Station $555,000 $1,410,000 $1,545,000 $1,575,000 Recycled Water Storage Tank - 1 MG $2,750,000 $2,750,000 $2,750,000 $2,750,000 Subtotal - Facilities $10,496,280 $17,117,720 $23,955,680 $24,687,920 Site Work and Yard Piping 15% $623,250 $806,250 $826,500 $831,000 Electrical & Instrumentation 20% $831,000 $1,075,000 $1,102,000 $1,108,000 Allowance for EIR Mitigation Measures $1,000,000 $1,000,000 $1,000,000 $1,000,000 VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-47
Description % Alternative 1 Alternative 2 Alternative 3 Alternative 4 Mobilization, Bonds, and Project
Insurances
12.5% $1,639,441 $2,525,809 $3,386,460 $3,479,303
Total Estimated Base Construction
Cost including 30% Contingency
$27,815,942 $42,854,693 $57,457,122 $59,032,355
Project Cost Total including 37%
project cost factor (engineering, legal,
construction management, project
management, regulatory, etc.)
$38,107,841 $58,710,929 $78,716,258 $80,874,327
Notes:
EIR - Environmental Impact Report
1.16 Evaluating the Need for a Recycled Water Program
Santa Maria's existing and future water supply is sufficient and reliable to meet projected urban and agricultural demands through 2045, which eliminates the need for developing an alternative water supply via recycled water usage, at this time. The 2020 UWMP confirms that the City's water sources, including groundwater from Santa Maria Valley Basin, SWP imports, and Twitchell Reservoir recharge are reliable under normal, single-dry and multiple-dry year conditions. With a total available water supply average of 36,712 AFY and projected demand remaining well below this level at a maximum of 17,816 AFY through 2045, Santa Maria has no foreseeable water shortages that would necessitate or encourage investing in a Recycled Water program. Additionally, Santa Maria receives water rights for recharging the Groundwater basin with their percolation pond operations, and implementing a Recycled Water program could jeopardize the City receiving this right. This section outlines other key reasons why Santa Maria should not invest in recycled water at this time.
1.16.1.1 No Regulatory or Physical Constraints on Water Access Santa Maria is in a unique legal position compared to many other California cities that face groundwater pumping restrictions. The Santa Maria Valley Groundwater Basin is adjudicated, meaning water allocations and extraction rights are legally defined and protected under a court-approved Stipulated Agreement.
This agreement allows the City to pump groundwater as needed up to its allocated amount, unlike many other California regions that face overdraft conditions or groundwater pumping restrictions.
Unlike other areas that rely solely on groundwater, Santa Maria's multi-source water portfolio eliminates dependence on any single supply. Twitchell Reservoir provides consistent groundwater recharge, while the City's SWP contract provides an allocation of imported water. Additionally, the connection to the SWP infrastructure provides a delivery method for alternative sources of water through purchases, groundwater banking, exchanges, or other opportunities. Because of this legal security and diversified supply, Santa Maria does not face the regulatory pressures or supply shortages that often push other municipalities toward recycled water adoption.
1.16.1.2 Lack of Agricultural Incentive for Recycled Water A significant portion of the Santa Maria Valley Groundwater Basin's water demand comes from agriculture, yet local farmers have little to no incentive to switch to recycled water. Groundwater is inexpensive - agricultural users only pay for the electricity required for pumping costs - making it a much VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-48
cheaper option than purchasing treated recycled water. Additionally, there are no restrictions on agricultural groundwater pumping, and the existing supply is both sustainable and legally protected. Since groundwater remains abundant, inexpensive, and easily accessible, agricultural users have no financial incentive to switch to a costlier alternative.
Beyond cost considerations, soil and crop sensitivity to water quality is another factor. Recycled water typically has higher salinity and nutrient levels, which can impact soil conditions and reduce crop yields, making it less desirable for high-value crops. Given these economic and agronomic realities, farmers are unlikely to voluntarily adopt recycled water, making large-scale implementation difficult to implement.
1.16.1.3 High Cost of Recycled Water Implementation
Recycled water implementation would add financial and logistical challenges to the City. Developing a recycled water program would require:
Major treatment facility upgrades to meet Title 22 water quality standards required for agricultural and urban reuse.
Extensive pipeline and distribution infrastructure, as the current system is not designed for recycled water delivery.
Higher operational and maintenance costs compared to existing water sources, including monitoring, treatment, and compliance expenses.
When comparing costs, Santa Maria's current water sources remain significantly more affordable than developing a recycled water system. With no strong demand from agricultural or urban users, the return on investment for recycled water simply does not exist. In addition, paying more than $25 million for the lowest cost alternative recycled water project would not benefit the community or the rate payers paying the costs for the project. This could become a Prop 218 issue when setting new rates to fund such a project, as those responsible for paying the costs would not be receiving the benefits.
1.16.1.4 Long-Term Water Supply Reliability
The 2020 UWMP analysis confirms that Santa Maria's water supply is secure even under drought and climate change scenarios. The City's reliability supply, as discussed in Section 1.3, Water Supply Characteristics, shows that, in a normal year, total available water far exceeds demand, leaving a significant surplus, in a single-dry year.
Santa Maria maintains a reliable water supply through a combination of groundwater, SWP imports, and Twitchell recharge. Even during multiple dry years, the City's diversified water portfolio ensures continued water availability without requiring restrictions.
Even under climate change projections, Santa Maria's multi-source supply strategy acts as a buffer against long-term water risks. With no anticipated restrictions, there is no urgent need for recycled water to supplement the existing system.
Thus, Santa Maria's current and projected water supply is more than adequate, eliminating the need for recycled water within the planning horizon of this Master Plan. While recycled water may be considered for long-term sustainability planning, there is no immediate regulatory, financial, or operational justification for its implementation. Santa Maria will continue to monitor its water resources and reassess the potential for recycled water only if future conditions warrant its inclusion. However, based on the VOLUME 7 / CHAPTER 1: REUSE FEASIBILITY STUDY
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-49
2020 UWMP projections and legal protections surrounding groundwater and imported water rights, the City's supply remains stable, cost-effective, and fully capable of meeting demand without alternative sources.
1.17 Conclusions
The evaluation of recycled water market opportunities within a five-mile radius of the WWTP identified two primary sectors for potential reuse in Santa Maria: Agriculture and Urban In-City use.
Based on the analysis, agricultural reuse presents a practical opportunity for consideration, particularly on City-owned land, which alone could accommodate a peak monthly demand of 0.9 mgd. Expanding to other feasible agricultural areas could increase recycled water utilization to 0.9-1.6 mgd, supporting irrigation of approximately 160-286 acres. Agricultural irrigation could be phased, and a pipeline could be extended further to supply other agricultural areas and some urban areas with recycled water. However, urban use would add minimal demand and is not currently justified since the dispersed nature of urban demand would require significant infrastructure investments that do not align with the limited demand.
However, with the smallest agricultural reuse project expected to cost more than $25 million to construct, and no requirement for farmers to switch from cheap groundwater to a more expensive recycled water supply, the success of this implementation is not currently feasible. While this poses a potential challenge during this planning horizon, the long-term benefits of sustainable water management and reduced dependence on traditional water sources could make agricultural reuse a reasonable approach in the future.
In addition, according to Santa Maria's UWMP 2020 and as discussed in Sections 1.5, Projected Water Supply Versus Demands, and 1.16, Evaluating the need for a Recycled Water Program, there is more than sufficient water supply available for municipal use until at least 2045.
In summary, given the above, this evaluation has shown that implementation of a recycled water program is neither necessary, due to the favorable and diversified water supply that the City has, or economically feasible due to the high construction cost and the low cost of water utilized by the farmers. In addition, paying more than $25 million for the smallest recycled water project for use on agriculture would not benefit the rate payers and could become a Prop 218 issue when setting new rates to pay for the project.
For these reasons, a recycled water project is not included within the planning horizon of this Master Plan and the City will maintain its current effluent disposal method via percolation ponds. Effluent disposal via percolation ponds is discussed in Volume 7, Chapter 2.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
CHAPTER 2 EFFLUENT DISPOSAL
2.1 Introduction
This chapter describes the effluent disposal approach using percolation ponds at the Santa Maria Wastewater Treatment Plant (WWTP), including geotechnical considerations, the current operational challenges, a summary of the regulatory requirements for future effluent disposal, and the method used to develop a water balance for the WWTP effluent. As part of the long-term master planning effort, understanding the present condition and capacities of the existing ponds will be valuable for decisions regarding future pond capacity needs.
The City of Santa Maria (City) is permitted under the City's General Waste Discharge Requirements Order (No. R3-2020-0020). The order states under Table 2 of Attachment 1 of the original Notice of Applicability (NOA) that: "The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. Table 2 lists the Wastewater Disposal Method as Percolation Ponds, 123 acres, and lists Disposal Capacity (mgd) as 8.0" As a result of that Order, a Time Schedule Compliance Plan (TSCP) was developed to bring the WWTP into compliance to meet stated effluent discharge quality limits. See Volume 2, Chapter 4 for details. The TSCP identifies several milestones and tasks to be completed by the City. One such task, Task 3, relates to the ponds. Task 3 states, "The City will conduct a study to investigate percolation pond water balance, geology/hydrogeology, and capacity. Recommendations for improvements will be developed." This chapter summarizes the development of the water balance, the operational challenges with the existing percolation ponds, and proposed recommendations for improvements.
2.1.1 Overview
As mentioned in Chapter 1 of this volume, Santa Maria percolates all of its secondary effluent into 15 separate percolation ponds. In April 2024, the City submitted plans to the Central Coast Regional Water Quality Control Board (Water Board) (see Appendix B) to construct three additional small ponds (called A-1, A-2, and A-3), totaling about one acre in area, to provide some additional seasonal retention.
These ponds came into service in July 2024. Average effluent flow, total suspended solids (TSS), and 5-day biochemical oxygen demand test (BOD5) concentrations from July 2023 to December 2024 are summarized in Table 2.1. Note that regular monitoring of BOD5 began in October 2023.
Table 2.1 Average Effluent Discharge - July 2023 to December 2024 Parameter Unit Value
Flow mgd 6.88
TSS mg/L 37.7
CBOD(1) mg/L 51
BOD5
(2) mg/L 76.0
Notes:
CBOD - carbonaceous biochemical oxygen demand; mg/l - milligrams per liter (1) City historically measured CBOD rather than BOD5 for compliance, through September 2023. (2) BOD5 data measured weekly since October 2023.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
The effluent is conveyed via gravity flow to 15 large percolation ponds located to the west of the WWTP, and also to the three new small ponds located to the east of the WWTP adjacent to Black Road. The percolation ponds located west of the WWTP are illustrated in Figure 2.1.
Figure 2.1 Aerial View of Existing WWTP and Percolation Ponds (2023)
2.1.2 Evaluation of Percolation Pond Performance
Various assessments of the percolation pond performance have been conducted over the years. The most recent assessment was completed in 2023, and estimates of the percolation rates were made based on level monitoring data provided by the City. A comparison of individual pond percolation rates provides an initial assessment of relative pond performance. Note that this evaluation was completed prior to the addition of the three small ponds, A-1, A-2 and A-3, mentioned earlier. Table 2.2 summarizes the construction dates of the ponds and their estimated percolation rates in inches per day. As shown from the 2023 data, the best-performing ponds have percolation rates in the 5 to 8 inches per day range, while the poorest-performing ponds only percolate 2 to 3 inches per day. Comparing the 2023 data to the 2006 design percolation rates shows some significant differences. With one exception, the design percolation rates are all significantly greater than the measured rates. Information compiled in Table 2.2 may be found in the report by Yeh and Associates (Yeh) in Appendix C.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3
Table 2.2 Percolation Pond Construction and Performance Pond
Number
Estimated Construction Range 2023 Estimated Percolation Rates(1) (inches/day)
2006 Estimated Design
Percolation Rates(2)
1 1960 - 1967 5-8 12
2 1978 - 1981 5-7 4
3 1960 - 1967 5-7 12
4 1978 - 1981 2-4 12
5 1960 - 1967 5-6 12
6 1978 - 1981 2-4 12
7 1960 - 1967 2-4 8.4
8 1978 - 1981 2-4 8.4
9(3) Not used
10(3) Not used
11 1994 - 2002 3-5 15
12 1994 - 2002 4-5 15
13 1994 - 2002 3-4 15
14 1994 - 2002 2-4 15
15 1994 - 2002 3-5 15
16(4) Not used
17(4) Not used
DKC 1994 - 2002 4-6 N/A
Wash 2009 - 2012 2-3 N/A
Notes:
N/A - not applicable
(1) Percolation rates provided in 2023 update discussed in Appendix C. (2) Design percolation rates from Task 4 of the 2006 City of Santa Maria Phase II WWTP Expansion. (3) Ponds 9 and 10 were decommissioned, and the land was transferred to Engel and Grey for composting operation. (4) Ponds 16 and 17 were not built or constructed onsite.
As indicated by the values in the table, there is a wide variation in percolation rates between the ponds, and the current estimated rates (2023 values) have declined significantly from the estimated percolation rates developed in 2006. The declining rates were confirmed in a 2024 assessment by GSI Water Solutions (GSI), which compared the percolation pond capacity visually, shown in Figure 2.2. A copy of GSI's report is included in Appendix D.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4
Figure 2.2 Visual Comparison of Percolation Pond Performance in 2023
2.1.3 Pond Operations
The City cycles the percolation ponds in a series of fill, dry, and rest cycles. During a fill cycle, the effluent is directed to the active ponds. Once the desired pond water level has been achieved, the influent gate is closed, and the pond level is allowed to drop as percolation occurs. After a 10 to 14-day period of percolation, the remaining water in the pond is pumped to an adjacent operating pond, and the first pond is allowed to dry out. Once the pond is dry, there is a rest period of 7 to 10 days, and then the pond is either put back into service or equipment is brought in to rip the soil in the bottom of the pond, followed by re-grading to prepare it for the next cycle. Winter operations necessitate that ponds will undergo four or five operational cycles before they are fully dried out for ripping.
Treated secondary effluent gravity flows to the percolation ponds through a series of distribution boxes.
Each pond includes a small earthen sump area at a low point in the pond, from where the Operations staff can pump down the ponds completely, ahead of a dry or rest cycle. Each pond is fitted with a level sensor that transmits the operating water level. These level sensors were installed in 2024 adjacent to level measuring staffs that were historically used to estimate the pond water depth.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5
2.2 Pond Area Estimates
2.2.1 Historical Percolation Pond Area
The overall pond area estimate noted in the initial NOA provided by the Central Coast Regional Water Quality Board is 123 acres. This information appears to be based on an analysis completed in 2006 for the expansion of WWTP completed in 2008, in which the percolation ponds were estimated to have the areas shown in Table 2.3, which totals 123.6 acres.
Table 2.3 Percolation Pond Areas
Pond Number Estimated Pond Area - 2006 Design(1)
(acres)
1 9.9
2 11.6
3 5.7
4 6.4
5 9.3
6 8.8
7 12.2
8 5.2
9(2) 8.4
10(2) 8.4
11 4.1
12 4.1
13 2.0
14 2.0
15 5.9
16(3) 8.6
17(3) 11.0
DKC(4) N/A
Wash(4) N/A
Total 123.6
Notes:
(1) Percolation areas provided in Task 4 of the 2006 City of Santa Maria Phase II WWTP Expansion. (2) Ponds 9 and 10 transferred to adjacent property owner (Engel and Grey) and decommissioned. (3) Ponds 16 and 17 were not constructed.
(4) No estimated pond areas for the DKC and Wash pond provided in the 2006 estimate.
However, since the 2006 study, two ponds (Ponds 9 and 10) were taken out of service and their land was used for other purposes, and two ponds (Ponds 16 and 17) were never constructed. The combined area of these four ponds is about 36 acres, which reduces the usable pond area to about 87.6 acres. This area excludes the areas of the DKC and Wash ponds, the areas of which were not noted in the 2006 analysis.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
2.2.2 Updated Pond Area Survey
Recently, the City carried out a series of aerial surveys of the existing ponds so that they could capture the topographical information of each pond when it was completely dry. These surveys were used to create a digital terrain model of the percolation pond area. From the digital terrain model, accurate measurements of the current pond areas could be made. Figure 2.3 shows a topographical image of the percolation pond area obtained from the City's aerial survey data, which includes the three new smaller ponds mentioned earlier.
2.2.2.1 Area Estimation
In order to quantify the daily water volume capacity and pond accumulation, an average surface area for each pond was estimated. Each pond was built with compacted earthen berms and constructed with 3:1 side slopes (horizontal to vertical). Outlet boxes are installed within the pond to manage water levels, provide controlled overflow during storm events, and prevent overtopping. The ponds were designed with a minimum of 2 feet (ft) of freeboard.
The surface areas were estimated based on a topographic survey, which displays elevation contours within and around each individual percolation pond. The computer-aided design (CAD) software then provides estimates of the area encompassed by that elevation contour. An overview of the topographical survey information used for the analysis is shown in Figure 2.3. The three new ponds A-1, A-2, and A-3 are indicated on the eastern side of the facility in Figure 2.3.
Figure 2.3 Topographic Survey Data for Percolation Ponds (2025) VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7
2.3 Pond Soils Assessment
Percolation rates are governed by the type of soils in the ponds. An assessment of current soil types within the ponds was carried out as part of the Master Planning effort by Yeh, assisted by GSI and the City.
2.3.1 Soils and Hydrogeological Investigation
There have been numerous hydrogeological investigations on the soil surrounding the WWTP to assess percolation pond performance. In general, City plant staff have reported that the existing percolation ponds perform at varying rates, and some improvements would be beneficial to the plant operations.
Yeh completed an evaluation of the soil and hydrogeological characteristics of the percolation ponds in 2024. They excavated 46 test pits, completed 30 cone penetration test (CPT) soundings, and completed thirteen 8-inch hollow stem auger exploratory borings to depths of 31 to 34.5 ft in order to evaluate the soils. The field work was focused on comparing the soils in ponds that have low percolation rates, such as Ponds 4, 6, and 14, and those that have higher percolation rates, such as Ponds 1, 2, and 3. The following summarizes the findings from the investigations; more details can be found in the report included in Appendix C:
Sieve analysis and hydrometer testing on 29 samples collected from the test pits and boring showed that ponds with the lowest observed percolation rates (Ponds 4, 6, and 14) had the lowest hydraulic conductivity values. On the other hand, ponds with the highest observed percolation rates (Ponds 1, 2, and 3) had soils with hydraulic conductivity values that were significantly higher. In the upper levels of each pond, there is an organic scum layer (about 0.25 inches thick) that accumulates after the fill-dry cycle. This scum layer alters the composition of the soil into a finer consistency (typically poorly graded sand to silty clay) and may impact percolation pond performance. Discontinuous silt and clay layers exist at lower depths across the percolation ponds, which may impact percolation pond performance.
The sand layers in the percolation ponds were observed to be of a dark black color. This is likely a result of TSS and organic accumulation, nitrogen consumption, and chemical interactions with the soil and effluent.
Desiccation of the soil layers has been observed in the soil, which suggests a higher concentration of clay and silt layers.
Based on these observations and the details presented in Appendix C, Yeh provided the following preliminary recommendations:
Update the operational procedures to include removal of the upper 2 to 4 inches of soil during the drying and rest periods.
Perform deep ripping of the bottom of the ponds each time a pond has dried. Plan for the phased removal of clayey and silty soil present within the upper 5 to 10 ft of the ponds over time. In 2012, the upper 5 ft of soil within Ponds 1, 2, 3, and 5 was processed by a sand/clay separator, referred to as "The Beast". After processing, the clay soil was removed, and the cleaned sandy soil was placed back into the ponds. This had a significant impact on the percolation rates, and as shown earlier in Table 2.2, Ponds 1, 2, 3, and 5 are still the best-performing ponds. A similar VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
operation is recommended for all ponds, starting with the ponds that have the lowest percolation rates.
If possible, reduce the TSS of effluent discharged to the ponds to avoid continued accumulation of fine material on the bottom of the ponds.
Transfer remaining pooled water left in ponds at the end of a cycle to a separate settling pond or to the plant headworks instead of to an adjacent percolation pond. In other words, avoid transferring fine material from pond to pond.
Consider evaluating dry wells, air blasting, or injection wells as supplemental measures.
The proposed rehabilitation measures and associated costs are discussed in Section 2.5.
2.4 Water Balance and Pond Capacity
In order to establish an accurate overall capacity of the percolation pond system, a water balance was performed. Simply adding up the observed percolation rates of each pond does not provide the true capacity of the system because not all ponds are operational all the time. As indicated earlier, ponds are rotated in and out of service on a regular basis. However, a water balance can show the overall storage capacity of the system on a daily basis, which provides an indication of how much additional water the system can handle.
2.4.1 Methodology
To achieve the water balance, it was important to quantify the inflow, outflow, evaporation, and percolation of water from the percolation ponds. The methodologies utilized to estimate these parameters are summarized in Table 2.4.
Table 2.4 Summary of Parameters Used to Obtain a Water Balance Parameter Methodology
Pond Inflow Plant influent flow data obtained from the City. Monitored and reported in mgd.
Daily plant influent flow is a good measure of the daily plant effluent flows to the percolation ponds.
Evaporation A Class A evaporation pan equipped with a data logger was installed in the pond area to capture evaporation data.
Precipitation Rainfall measurements were made on site. These were found to match the California Irrigation Management Information System Data Station 232 - Santa Maria Airport fairly closely. So, for the purpose of the water balance, the Station 232 data was used.
Other Water Losses A certain amount of water is retained in the biosolids hauled from the plant each day for disposal. For the purposes of this water balance, these water losses were assumed to be approximately equal to the City water that is used as process water in the plant.
Pond Water Depth The depth of water in each pond was measured using the measuring staff, and later the level sensors installed in each percolation pond sump.
Pond Areas The average working area of each pond was calculated from topographic survey data obtained by the City (discussed in more detail below).
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
For more information regarding the development of these input parameters, refer to the report by GSI in Appendix D.
A water balance was generated over the 18-month period of July 2023 to December 2024. The balance was developed using basic mass balance principles, where the mass entering a system must equal the mass leaving a system, assuming no accumulation, as illustrated in Figure 2.4.
Figure 2.4 Schematic of Pond Water Balance Calculation
2.4.2 Pond Area Assessment
In order to establish the daily volume of water in each pond, the average pond area was multiplied by the pond water depth on that day. To determine the average pond area, the topographical data was used to first determine the Top of Berm elevation for each pond. The Civil 3D software allows the surface area at this elevation to be calculated. Based on this elevation, the Top of Water elevation was then established, two ft below the Top of Berm elevation. The Bottom of Berm elevation was established based on the elevation at which the 3:1 slope of the pond berm ends. Finally, the bottom elevation of the pond was estimated from the shape of the bottom of the pond and the number of contour lines available. Each of the different elevations obtained from the topographic data is described in Table 2.5.
Table 2.5 Percolation Pond Estimation Descriptions
Designation Method
Top of Berm Elevation and contour area associated with the top of the compacted earthen berms surrounding each pond.
Top Water Level Elevations and contour area associated with the top design water level of each pond to provide two ft of freeboard to the Top of Berm elevation.
Bottom of Berm Elevation and contour area associated with the hinge point at the bottom of the 3:1 sloped berm.
Bottom of Pond Average elevation and contour area of the bottom of the pond, accounting for the downward slopes of the pond bottom towards the outlet box.
The surface area estimation for each pond was calculated by taking the average area associated with the "Top Water Level" elevation contour and the "Bottom of Berm" elevation contour. The difference in VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
elevation between the Bottom of Berm elevation and the Bottom of Pond elevation was used to adjust the working depth of each pond.
Using Pond 15 as an example, the elevation at the top of the berm is 147 ft. The area contour associated with that elevation is 7.11 acres. The Top Water Level contour would be 145 ft with an associated area of
6.63 acres. Similarly, the other elevations and areas for Pond 15 were obtained from the topographic survey data and are summarized in Table 2.6. The table shows that there is an elevation difference between the Bottom of Pond and the Bottom of Berm. In an ideal world with a perfectly flat bottom on the pond, the Bottom of Pond and Bottom of Berm would be the same. However, operationally, it is difficult to obtain a perfectly flat pond bottom, and a totally flat bottom would not be desired as it is important to have some slope remaining on the bottom of the pond to allow for drainage when the pond is taken out of service. As shown in Table 2.6, for Pond 15, the elevation of the bottom of the pond was estimated to be one foot below the Bottom of Berm level, which adds an extra foot of capacity. This is an estimate based on the actual shape of the contours, unique to each pond.
Table 2.6 Pond 15 Topographic Survey Results - Area Estimation Designation Elevation Area (acres) Working Depth (ft)
Top of Berm 147 ft 7.11
Top Water Level 145 ft 6.63 11(1)
Bottom of Berm 134 ft 4.95
Bottom of Pond 133 ft 3.14 1
Average 139.5 ft(3) (6.63 - 4.95) = 5.79(2) 12(4)
Notes:
(1) The difference between the Top Water Level and the Bottom of Berm provides the "ideal" operating depth. (2) Average Surface area taken to be the average of the "Top Water Level" and "Bottom of Berm" areas. For mass balance, this assumes that the bottom of the pond is flat.
(3) Elevation corresponding to the average pond area (134 + (145-134)/2). (4) Working depth based on "ideal" depth plus correction amount based on actual contours of the pond bottom.
This approach is depicted in Figures 2.5 and 2.6. The red lines on the exterior of the pond represent "Top Water Level", that is 2 ft below the Top of Berm, and the "Bottom of Berm" elevation. The green line represents the average of the two. The green line is taken to be the "average area" used to calculate the daily pond depth.
The purple line is representative of the "bottom of pond" elevation, which in this case adds an additional one foot of water depth, used for calculating the maximum capacity of the pond, bringing the total depth to 12 ft.
Figure 2.5 Topographic Analysis of Pond 15 - Total Pond Overview VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
Figure 2.6 Topographic Analysis of Pond 15 - Zoomed-in View of Contours Using this method, the average surface areas for each pond were developed from the latest topographical data. These areas are shown in Table 2.7. Note that the average surface areas are based on the average of the "Top Water Level" and the "Bottom of the Berm" topographic contours. This approach assumes an idealized flat surface for the bottom of the pond, which is not always the case. As shown in the table, this method results in an average total pond area, based on top and bottom areas, of 80.4 acres.
Table 2.7 Calculated Percolation Pond Average Surface Areas Pond Number Area (Acres)
1 6.6
2 7.7
3 3.1
4 4.6
5 6.4
6 6.9
7 1.6
8 3.0
11 6.1
12 6.3
13 6.7
14 7.1
15 5.8
DKC 6.2
WASH 1.3
A-1(1) 0.5
A-2(1) 0.1
A-3(1) 0.34
Total 80.4
Notes:
(1) Average areas of ponds A-1, A-2, and A-3 were provided by the City. These areas ended up being slightly less than anticipated by the City (see Appendix B for initial area estimates).
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-12
2.4.3 Water Balance Analysis
Over the July 2023 to December 2024 period, the City provided daily logs of the depth of water in each pond. An example of the provided pond water depths can be found in Appendix D.
Using the previously calculated average surface areas from Table 2.7 and the recorded daily pond water depths, the active volume of each pond can be calculated on a daily basis. Using the daily record of individual pond volumes, the daily total volume of water in the percolation pond system could also be determined, and by taking the pond volume observed over one day and subtracting it from the previous day the change in total pond volume, or the percolated volume plus evaporative loss minus rainfall accumulation, could be calculated. Table 2.8 shows the approach used to determine the water balance.
Table 2.8 Summary of Method Used to Determine the Water Balance Term Equation Used
Pond Volume = 𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅𝑅 𝑝𝑝 𝑝𝑝 𝑤𝑤𝑤𝑤𝑤𝑤 ℎ (𝑓𝑓 ) ∗ 𝐸𝐸𝐸𝐸 𝐸𝐸𝐸𝐸 𝑝𝑝 𝑝𝑝 (𝑓𝑓 2) Daily Accumulation = (𝑃𝑃 𝑉𝑉 𝑉𝑉𝑉𝑉 , ) − (𝑃𝑃 𝑉𝑉 𝑉𝑉𝑉𝑉 , − 1) Percolation = 𝐹𝐹 𝑃𝑃 ,𝑄𝑄 + 𝑃𝑃 − 𝐸𝐸𝐸𝐸 𝐸𝐸 − 𝐴𝐴
Based on the GSI report in Appendix D, the average precipitation observed over the time period was
0.22 mgd, and the average evaporation was 0.18 mgd. Accordingly, the average addition to the pond system was set at +0.04 mgd to account for this effect.
2.4.4 Maximum Pond Capacity Analysis
To determine the maximum working volume of the percolation ponds, the maximum working depth is needed. This depth is the difference in elevation between the "Bottom of the Pond" and the "Top Water Level." As mentioned above, the "Bottom of the Pond" elevation is below the "Bottom of Berm" elevation and accounts for the ground sloping towards the discharge sump, and was typically taken as the midpoint of the slope along the bottom of the pond. For some ponds, however, (Ponds 1, 2, 3, 5, 7, 8, and DKC), the elevation change was not significant, and therefore the "Bottom of the Pond" elevation was taken as being equal to the "Bottom of the Berm" elevation.
Accordingly, the maximum water depths utilized for calculating the maximum volume of the pond system are shown in Table 2.9. The depths of new ponds A-1, A-2 and A-3 were typically around 4.5 feet.
Table 2.9 Percolation Pond Maximum Depths
Pond Number Top Water Level Elevation Bottom of Pond Elevation Maximum Depth (ft)(1) 1(2) 154 140 14
2(2) 153 139 14
3(2) 153 138 15
4(3) 153 144 9
5(2) 153 137 16
6(3) 152 144.5 7.5
7(2) 153 140 13
8(2) 152 145 7
11(3) 146 140 6
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-13
Pond Number Top Water Level Elevation Bottom of Pond Elevation Maximum Depth (ft)(1) 12(3) 146 136 10
13(3) 144 135 9
14(3) 145 134.5 10.5
15(3) 145 133 12
DKC(2) 152 142 10
WASH(3) 153 140.5 12.5
Notes:
(1) Maximum depth is the value utilized for calculating the maximum volume of the pond, using the average surface areas developed in Table 2.7.
(2) Ponds with a relatively flat ground surface, where the "Bottom of the Berm" elevation is taken as the low point. (3) Ponds with a sloping ground surface, where the "Bottom of the Pond" elevation is taken as the low point.
Subsequently, using the maximum depths found in Table 2.9 and the average areas found in Table 2.7, the maximum volume of all the ponds can be determined.
2.4.4.1 Probe Calibrations
In 2024, the City replaced the manual staff gauges in the 15 large ponds and added pressure sensors.
As part of the replacement, it was observed that there was a discrepancy between the readings of the new and the old gauges. As such, the City recorded the discrepancies and the date of the replacement.
Because the new electronic level sensors are considered to be more accurate, a series of correction factors was used to update all previous gauge readings to the new electronic sensors. The correction factors were retroactively applied to all the pond height readings utilized in this analysis.
A list of the correction factors and the date of replacement is shown in Table 2.10. The correction factors were applied to all data prior to the date on which the gauge was replaced, so that all readings are consistent.
Table 2.10 Correction Factors For Calibrating New and Old Pond Depth Measurements Pond Number Date Calibrated Difference to be Applied to New Measuring Sensor (inches)
1 October 29, 2024 27
2 November 6, 2024 18
3 December 5, 2024 8
4 October 4, 2024 15
5 November 27, 2024 -5
6 October 17, 2024 -6
7 October 24, 2024 20
8 October 19, 2024 18
11 October 15, 2024 9
12 October 4, 2024 3
13 October 22, 2024 0
14 November 8, 2024 7
15 November 21, 2024 3
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-14
Pond Number Date Calibrated Difference to be Applied to New Measuring Sensor (inches)
DKC October 19, 2024 23
WASH October 29, 2024 3
2.4.4.2 Maximum Volume Capacity Analysis
As mentioned above, the assumption to use "Bottom of the Pond" contours more accurately captures the usable volume of the pond, rather than using the "Bottom of Berm" elevation to represent the lowest pond level. As shown in Figure 2.7, the topographic contours illustrate a declining ground slope towards the outlet box in Pond 4. This ground slope is significant in several of the ponds. Therefore, when estimating the total volume of the ponds, the increased depths need to be captured in the estimate.
If the "Bottom of the Berm" elevation was utilized in Pond 4 instead of the "Bottom of the Pond" elevation, approximately 4 ft of depth would not be included in the maximum volume. That has a significant impact on overall capacity of the pond. As a result, the maximum volume capacity for Ponds 4, 6, 11, 12, 13, 14, 15, and wash pond was based on "Bottom of Pond" elevations. The maximum volume capacity for the other ponds was based on "Bottom of Berm" elevations due to the minimal observed ground slope. This provides a more reasonable estimate of actual pond capacity.
Figure 2.7 Topographic and Aerial of Pond 4
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-15
2.4.5 Results
2.4.5.1 Mass Balance Analysis
The daily influent flow to the plant is plotted in Figure 2.8 for the period of July 2023 to December 2024.
The yellow continuous line in Figure 2.8 is the 30-day moving average. As noted earlier, the influent flow to the plant is a good measure of the treated effluent flow to the percolation ponds. Unaccounted for flow includes the water that is lost from the system with treated solids, and water that is added to the system through the use of City water for washing down and pump seal water. Both of these flows are small compared to the influent flow and, as noted, are assumed to offset each other.
Figure 2.8 Daily Influent Flow to the WWTP and 30-Day Rolling Average Initially, for the first 60 days (July and August 2023), the recorded daily influent flow was around 8.5 mgd, and there were several days when the flow was above 9 mgd, both greater than the permitted flow.
However, after recalibration of the influent flow meter early in September 2023, the influent flow dropped to around 7 mgd. And the flow has remained more or less stable since then, with the 30-day rolling average between about 6 and 7 mgd. However, as the data shows, even after the flowmeter recalibration, there are individual days when the influent flow is well above 8.0 mgd.
Over the entire time period, the average flow to the ponds was 6.88 mgd. When including the net precipitation and evaporation, the average flow is equal to 6.92 mgd.
Using the observed pond water depth and the average pond area, the working volume of each individual pond was calculated. The individual pond volumes were summed to provide a daily variation of the total volume of water within the ponds. This is shown in Figure 2.9 for the entire 18-month period.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-16
As shown, the total volume of water in the ponds varied between about 413 acre feet (AF) in July 2023 to a peak of about 680 AF in January/February 2024, during one of the wettest winters on record. As noted on Figure 2.9, the total pond capacity, excluding the 2 ft of freeboard, is about 870 AF.
The daily variation in total pond volume results from either an accumulation of water (through rainfall, poor percolation, increased effluent flow) or a loss of water (through evaporation, percolation, decreased effluent flow), as presented earlier in Figure 2.4. By accounting for the rainfall, evaporation, effluent flow, and daily change in total pond volume, the average volume of water lost through percolation can be determined. The average percolation on a monthly basis is illustrated in Figure 2.10. As indicated, the percolation rate varies throughout the period, with high values of 8.8 mgd and 8.4 mgd achieved in July/August 2023 and August 2024, respectively. This is understandable because not all ponds are in service continuously. As mentioned earlier, ponds are rotated into and out of service to allow time for resting, followed by ripping and grading. In addition, as presented earlier, not all ponds have the same individual percolation rates, so a combination of ponds that includes the majority of "poor performers" will result in a lower overall percolation rate. Overall, over the 18-month period under review, the percolation ponds percolated an average of 6.84 mgd (blue column in Figure 2.10), roughly in line with the influent flow. This confirms that over the entire period, there was no net increase in the volume of water held in the ponds.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-17
Figure 2.9 Total Working Volume in All Ponds
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-18
Figure 2.10 Calculated Monthly Average Volume Percolated
2.4.5.2 Remaining Pond Capacity
The maximum pond capacity was determined to be 870 AF, excluding the 2 ft of freeboard, as noted.
From the daily volume variation data presented in Figure 2.9, the maximum observed volume reached was 677 AF, or about 78 percent of the maximum capacity. This means that 22 percent of the pond capacity was still available, indicating that the ponds have capacity to dispose of additional flow.
2.4.6 Pond Percolation Capacity
As listed in the permit, the percolation disposal capacity is noted as a daily capacity and limited to
8.0 mgd. Clearly, from the daily plant influent data presented in Figure 2.8, the pond system has been receiving flow that exceeds 8.0 mgd at times, even after the calibration of the influent flow meter. The City has had to report such violations based on the daily permitted flow, although the above analysis has shown that the pond capacity easily exceeds a daily average of 8.0 mgd. Therefore, to avoid such permit violations, a request should be made to the Water Board to adjust the permit.
The maximum volume that the ponds have held over the 18-month period under review, which included one of the wettest winter seasons on record, was 78 percent. This suggests that the ponds could take on more flow and not be at risk of reaching their maximum capacity. This is supported by the calculated average volume of water percolated by the ponds on a monthly basis. Figure 2.10 shows that the ponds can percolate well over 8 mgd on an average monthly basis, as well as a daily basis.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-19
Based on the data set available, it is concluded that the pond capacity is greater than the listed value in the permit. The data shows that, with all ponds in service, the maximum monthly percolation volume is
9.2 mgd. Being conservative and allowing for the largest pond out-of-service (7.7 acres) to accommodate pond rotation/maintenance, gives a monthly average working capacity of 8.3 mgd. Accordingly, using the approach of the largest unit out-of-service, a more reasonable permitted capacity for the ponds should be a monthly average capacity of 8.3 mgd. Using a monthly average value rather than a daily average value will prevent unnecessary flow violations associated with daily peak flows that occur periodically.
A summary of the above analysis was prepared in a technical project memorandum and submitted to the Water Board in February 2026, recommending that the permitted pond capacity be amended to a monthly average of 8.3 mgd. A copy of the Memorandum is included in Appendix E.
2.5 Pond Rehabilitation and Cost
As discussed in Section 2.3, the 2024 soils investigations resulted in a number of recommendations for rehabilitation of the ponds to improve and sustain performance. Table 2.11 summarizes the recommended rehabilitation actions, the anticipated costs per pond, the number of ponds to be addressed each year, and the total amount to be included in the City's Operations and Maintenance (O&M) budget. Rather than capital projects, this rehabilitation work would be carried out as part of ongoing pond O&M to improve pond percolation rates in the short term and maintain such rates in the longer term. See Appendix F for details of the estimated cost per pond for removal, cleaning, and replacement of 5 ft of soil. It is anticipated that this work would be repeated every 10 to 15 years as pond percolation rates begin to decline.
Table 2.11 Percolation Pond Rehabilitation and Estimated Cost Rehabilitation Action Impacted Ponds Estimated Cost
per Pond
Ponds per
Year
O&M
Budget
Remove upper 2 to 4 inches of soil All $6,500 5 $100,000 Perform deep ripping after drying All Included(1) 5 -
Removal of upper 5 ft of soil, clean and
replace(2)
All - Start with Ponds 4,
6, 7, 8, and 14
Varies based on
soil volume(3)
3 to 4 per year
in summer
$23,000,000
(4)
Reduce TSS of effluent discharged to ponds All Part of separate project(5)
N/A N/A
Transfer fines to separate settling pond(6) All Not yet established
N/A $150,000
Notes:
(1) Assumed to be included as part of the ongoing operations. (2) Repeat every 10 to 15 years or when percolation rates drop to 2 to 4 inches per day range. (3) See Appendix F for details.
(4) Amount is for cleaning all ponds once, and cleaning would take about 5 years to complete ($4.6 million per year). Budget amount would be required roughly every 10 to 15 years depending on rate of solids build-up. (5) The City may or may not implement an interim tertiary filter project. (6) Placeholder for implementing transfer of final pond drainage water to separate settling pond.
2.5.1 Need for Additional Percolation Pond Capacity
As noted in Section 2.4, the City continuously rotates the ponds into and out of service, but the out-of-service ponds only remain unused for a period of a few days. As a result, there is not sufficient VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-20
excess capacity to allow the City to take one or more ponds out of service during the summer months for extended rehabilitation/maintenance work. As noted in Table 2.11 for the soil removal/cleaning/replacement operation, only about 3 to 4 ponds could be rehabilitated each year.
This work would be done during the summer months when the ponds could be allowed to dry out completely, but this is also the time of year that the WWTP receives its highest flow rates.
In order to create flexibility to take one or more ponds out of service for an extended period for rehabilitation, the City has decided to construct additional percolation ponds. These ponds will be located on City-owned property on the east side of Black Road in an area that is currently used for agriculture.
Figure 2.11 shows a preliminary layout for the six new proposed ponds, each with an area of approximately 7 acres. The new percolation pond project is expected to get underway in the first half of 2026 and be completed by the end of 2029. Once the new ponds are in service, the most poorly performing existing ponds (Ponds 4, 6, 7, 8, and 14) can be scheduled for rehabilitation, and then the regularly scheduled rehabilitation of the remaining ponds can follow.
Figure 2.11 Preliminary Layout for the Proposed New Percolation Ponds VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-21
2.6 Conclusions/Recommendations
Based on pond investigations conducted recently and reported above, the following concluding comments can be made:
1. The most recent pond investigations have confirmed that, from a hydrogeological perspective, the pond percolation rates have decreased over time, and at least 5 of the 15 ponds are now performing poorly. The City cycles the operation of all ponds continuously and does not have flexibility to take ponds out of service for an extended period for required rehabilitation to improve percolation performance. Accordingly, the City is in the early stage of implementing the design and construction of an additional approximately 40 acres of new ponds to provide operational flexibility for required routine pond maintenance to sustain the long-term performance.
2. The current effluent TSS concentration contributes to an accumulation of an organic scum layer on the bottom of the ponds, resulting in conversion of graded sandy soils to clay and silty soils. This reduces the performance of the percolation ponds and results in longer drying periods. As effluent flow rates increase, the ponds may no longer be able to dry as quickly, and may cause the available capacity to decrease rapidly. When the treatment process is upgraded to meet the new General Permit requirements, the effluent TSS concentrations are expected to be significantly lower. In the interim period, the City is considering the benefits/costs of installing a temporary filtration system to improve the effluent quality and reduce the TSS load to the ponds.
3. In order to sustain the performance of the existing ponds over the long term, the following actions were recommended:
» Update the operational procedures to include removal of the upper 2 to 4 inches of soil during the drying and rest periods. This action will require the ponds to dry out sufficiently to allow machines to enter the ponds.
» Perform deep ripping of the bottom of the ponds each time a pond has dried. » Plan for the phased removal of clayey and silty soil present within the upper 5 to 10 ft of the ponds over time. This more extensive work would require a pond to fully dry out and be out of service for more than a month while soil cleaning is taking place. This work would be scheduled once the planned new ponds are in service.
» Reduce the TSS of effluent discharge.
» Transfer remaining pooled water left in ponds at the end of a dry cycle to a settling pond or to the plant headworks instead of to an adjacent percolation pond.
The City should budget about $23 million over the next 5 to 8 years as part of an O&M budget to perform rehabilitation on all 15 existing ponds.
4. The findings from the water balance exercise showed that despite the noted decrease in percolation rates, the ponds are able to dispose of all flow that they receive. In fact, based on a detailed assessment over 18 months of operation, the ponds never accumulated more than 78 percent of their total holding capacity, indicating that the ponds can dispose of more flow than they currently receive.
VOLUME 7 / CHAPTER 2: EFFLUENT DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-22
5. As listed in the new General Permit, the percolation disposal capacity is noted as a daily capacity and limited to 8.0 mgd. Daily plant influent data shows that the ponds have been receiving flows that exceed 8.0 mgd at times, even after the recalibration of the influent flow meter in September 2023.
The City has had to report such violations based on the daily permitted flow. The water balance analysis has shown that the pond capacity easily exceeds a daily average of 8.0 mgd. Therefore, assuming that the pond system has the equivalent of the largest pond out-of-service, it is recommended that the permitted capacity of the ponds be modified to a monthly average of
8.3 mgd. A request was submitted to the Water Board for this adjustment in February 2026, which should see the City through to the point where additional pond capacity has been constructed, after which the monthly average flow can be adjusted again.
6. The listed pond area in the new General Permit is 123 acres. The most recent aerial survey data has shown that the actual pond percolation area is 80.4 acres. This will need to be updated by the Water Board in the NOA.
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A PRELIMINARY COST ESTIMATES
VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-1
Table A.1 Preliminary Cost Estimates
Description % Alternative 1 Alternative 2 Alternative 3 Alternative 4
TREATMENT PROCESS AREAS
UV System (1 mgd/2 mgd) $520,000 $800,000 $800,000 $800,000 Tertiary Filtration (1 mgd/2 mgd) $330,000 $415,000 $415,000 $415,000 Installation 50% $165,000 $207,500 $207,500 $207,500
Recycled Water Pipelines $6,341,280 $11,742,720 $18,445,680 $19,147,920 Recycled Water Pump Station $555,000 $1,410,000 $1,545,000 $1,575,000 Recycled Water Storage Tank - 1 mgd $2,750,000 $2,750,000 $2,750,000 $2,750,000 Subtotal - Direct Costs $10,661,280 $17,325,220 $24,163,180 $24,895,420
GENERAL SITE AND CIVIL
Site Work and Yard Piping 15% $623,250 $806,250 $826,500 $831,000
ELECTRICAL, INSTRUMENTATION, AND CONTROLS
E&I Costs 20% $831,000 $1,075,000 $1,102,000 $1,108,000
GENERAL
Unanticipated EIR Mitigation Measures $1,000,000 $1,000,000 $1,000,000 $1,000,000 Mobilization, Bonds, and Project Insurances 12.5% $1,639,441 $2,525,809 $3,386,460 $3,479,303 Subtotal - Direct Costs $14,754,971 $22,732,279 $30,478,140 $31,313,723 Contingency 30% $4,426,491 $6,819,684 $9,143,442 $9,394,117 Contractor Overhead, Profit & Risk 15% $3,123,136 $4,811,666 $6,451,206 $6,628,071 Sales Tax (Based on 50% of Total Direct
Costs + Contingency)
8.8% $839,189 $1,292,898 $1,733,444 $1,780,968
Escalation to Midpoint (2030) 3.7% $4,672,155 $7,198,166 $9,650,890 $9,915,477 Total Estimated Base Construction Cost $27,815,942 $42,854,693 $57,457,122 $59,032,355 Engineering Support - Design and
Preconstruction Activities
15% $4,172,391 $6,428,204 $8,618,568 $8,854,853
Project Management and City Coordination 5% $1,390,797 $2,142,735 $2,872,856 $2,951,618 Engineering Support - Construction
Management
7% $1,947,116 $2,999,828 $4,021,999 $4,132,265
Legal and Administrative Fees 5% $1,390,797 $2,142,735 $2,872,856 $2,951,618 Regulatory Compliance 5% $1,390,797 $2,142,735 $2,872,856 $2,951,618 Project Cost Total $38,107,841 $58,710,929 $78,716,258 $80,874,327 VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B CITY OF SANTA MARIA WWTP -
PERMIT MODIFICATION REQUEST
CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
ATTACHMENT A 1
Technical Memorandum
City of Santa Maria - Wastewater Treatment Plant
Subject:
Prepared for:
Prepared by:
Date:
Minor Modification Request – Additional Pond Locations
Central Coast Regional Water Quality Control Board
Christos A. Stoyos, P.E., City of Santa Maria
April 10, 2024
This technical memorandum (TM) presents the City of Santa Maria’s plans to construct three additional ponds to increase seasonal effluent retention and to assist current efforts to evaluate the WWTP’s percolation pond capacity and performance.
The area where the City proposes to expand this additional retention capacity is at the southeast corner of the WWTP property. This area had accommodated two larger ponds in the past, and prior to the 2008 WWTP upgrade which added a new primary clarifier and a new primary trickling filter. The photo included below shows the approximate size and location of these two ponds in the 2002 aerial photo.
CITY OF SANTA MARIA WWTP - PERMIT MODIFICATION REQUEST
ATTACHMENT A 2
Three new ponds with the following characteristics will be constructed on the available land:
POND
ID
POND
AREA
(acres)
POND
RETENTION
CAPACITY
(acre-feet)
A-1 0.63 2.05
A-2 0.14 0.43
A-3 0.40 1.67
TOTALS 1.17 4.13
The proposed ponds do not necessarily increase disposal capacity but do provide for additional effluent retention and additional “rest period” to assist with routine maintenance and specifically with the evaluation of the existing pond percolation performance where additional time is needed to accommodate geotechnical investigations.
The drawings accompanying this TM illustrate the location and the geometry of the new ponds, the effluent circulation piping, and the proposed sample points. Standard freeboard equals or exceeds 2 feet in all three ponds.
The City will increase sample monitoring and incorporate these three new ponds in the Monitoring and Reporting Program No. R3-2023-0032 and upload all necessary effluent sample information to GeoTracker.
The City values that this minor improvement will alleviate immediate concerns due to the wet weather, will benefit the WWTP operations and routine pond maintenance schedule, and will assist our efforts to evaluate percolation pond capacity and performance. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ABCDEFGHJKLMNP DATE: CHECKED BY: DESIGNED BY: SHEET LETTER DATE DATE 0F SHEETS REFERENCESFILE NUMBER CITY OF SANTA MARIA DEPARTMENT OF UTILITIES SCALE: DATE: APPROVED REVISION WWTP SITE PLAN PERMIT MODIFICATION REQUEST CITY OF SANTA MARIA - WWTP POND 14 POND 15 POND 12 POND 13 POND 11 DKC WASH POND 7 POND 5 POND 1 POND 3 POND 8 POND 6 POND 4 POND 2 SLUDGE DRYING BEDS SLUDGE DRYING BEDS SLUDGE DRYING BEDS WWTP OPERATIONS A-1 A-2 A-3 IS-1 ES-1 P/L P/L P/L P/L P/L P/L P/L P/L RAY RD ENGEL & GRAY COMPOST FACILITY 1"=200' 3/29/2024 1 2 POND EXPANSION AREA SEE SHEET 2 OF 2 0 200 400 Feet 1:2400 200 WWTP SITE PLAN SCALE: 1" = 200' NEW POND INFORMATION POND ID POND AREA (ACRES) POND RETENTION CAPACITY (ACRE-FEET) A-1 0.63 2.03 A-2 0.14 0.43 A-3 1.17 4.13 TOTALS 1.17 4.13
BLACK RD WWTP ENTRANCE CAS ATTACHMENT A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ABCDEFGHJKLMNP DATE: CHECKED BY: DESIGNED BY: SHEET LETTER DATE DATE 0F SHEETS REFERENCESFILE NUMBER CITY OF SANTA MARIA DEPARTMENT OF UTILITIES SCALE: DATE: APPROVED REVISION POND EXPANSION LAYOUT & TYPICAL POND CONSTRUCTION PERMIT MODIFICATION REQUEST CITY OF SANTA MARIA - WWTP 1"=50' 3/29/2024 2 2 A-1 A-2 A-3 BLACK RD P/L P/L P/L P/L ES-1 EFFLUENT SAMPLING POINT IS-1 INFLUENT SAMPLING POINT NTS NOT TO SCALE P/L WWTP PROPERTY LINE MAXIMUM EFFLUENT LEVEL INDICATES DIRECTION OF FLOW 159.56 SPOT ELEVATIONS SAMPLING LOCATION WWTP ENTRANCE Feet 0 50 100 IS-1 ES-1 2A PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC POND EXPANSION LAYOUT SCALE: 1" = 50' A/2 NTS 10' - 15' VARIES 2:1 2' TYP. 3:1 TYP. VARIES TYPICAL POND CONSTRUCTION LEGEND & ABBREVIATIONS PROPOSED EFFLUENT CIRCULATION PIPE 6" DIA. PVC WWTP OPERATIONS FREE BOARD CAS ATTACHMENT A VOLUME 7 / WATER REUSE AND LIQUID DISPOSAL
OCTOBER 2026 / FINAL / CAROLLO
CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX C YEH AND ASSOCIATES
GEOTECHNICAL DATA REPORT
GEOTECHNICAL DATA REPORT
City of Santa Maria Wastewater Treatment Plant
Percolation Pond Study
601 Black Road, Santa Maria, California
Yeh Project No.: 223-184
March 20, 2025
Prepared for:
Carollo Engineers
3150 Bristol Street, Suite 500
Costa Mesa, CA 92626
Attn: Graham Juby, PE
Prepared by:
Yeh and Associates, Inc.
391 Front Street, Suite D
Grover Beach, California 93433
Phone: 805-481-9590
391 Front Street, Suite D
Grover Beach, CA 93433
(805) 481-9590
www.yeh-eng.com
Colorado California
Denver | Colorado Springs | Durango | Glenwood Springs | Grand Junction | Greeley Grover Beach | Ventura March 20, 2025 Project No. 223-184
Carollo Engineers
3150 Bristol Street, Suite 500
Costa Mesa, CA 92626
Attn: Mr. Graham Juby, PE
Subject: Geotechnical Data Report, City of Santa Maria Wastewater Treatment Plant, Percolation Pond Study, 601 Black Road, Santa Maria, California Mr. Juby:
Yeh and Associates, Inc. is pleased to submit this geotechnical data report for the Santa Maria Wastewater Treatment Plant Pond Percolation Study in Santa Maria, California. This data report was prepared as requested by Carollo and summarizes the field and laboratory test results collected for the project. Yeh has also coordinated with GSI Water on their hydrogeologic evaluation of the percolation of the ponds and their recommendations for improving the percolation of the ponds. This report was prepared in accordance with the Professional Services Agreement with Carollo, dated October 3, 2023.
We appreciate the opportunity to be of service. Please contact Judd King at 805-801-6416 or [email protected] if you have questions or require additional information.
Sincerely,
YEH AND ASSOCIATES, INC.
Reed Hooke, EIT Judd J. King, P.E., G.E.
Senior Staff Engineer Senior Geotechnical Engineer
Reviewed by:
Jonathan D. Blanchard, P.E., G.E.
Principal Geotechnical Engineer
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 ii
Table of Contents
1. PROJECT DESCRIPTION AND UNDERSTANDING ........................................................................ 1
1.1 PROJECT DESCRIPTION .................................................................................................................... 1
1.2 EXISTING SITE DESCRIPTION ............................................................................................................. 2
1.3 AERIAL PHOTOGRAPH REVIEW.......................................................................................................... 2
1.4 PREVIOUS STUDIES ......................................................................................................................... 3
1.5 REHABILITATION EFFORTS ................................................................................................................ 4
1.6 POND PERFORMANCE ..................................................................................................................... 6
2. FIELD EXPLORATION AND LABORATORY TESTING .................................................................... 7
2.1 CONE PENETRATION TESTING........................................................................................................... 8
2.2 TEST PITS ..................................................................................................................................... 8
2.3 DRILLING...................................................................................................................................... 8
2.4 LABORATORY TESTING .................................................................................................................... 9
3. SUBSURFACE CONDITIONS....................................................................................................... 9
3.1 REGIONAL AND SITE GEOLOGY.......................................................................................................... 9
3.2 SUBSURFACE CONDITIONS ............................................................................................................. 10
3.2.1 GEOLOGIC UNITS ................................................................................................................. 10
3.2.2 GROUNDWATER CONDITIONS ................................................................................................. 11
3.3 SUMMARY OF LABORATORY TESTS................................................................................................... 11
4. OBSERVATIONS AND CONCLUSIONS ......................................................................................13
4.1 TEST PITS ................................................................................................................................... 13
4.2 EXPLORATORY DRILLING AND CPT SOUNDINGS.................................................................................. 15
4.3 OPERATIONAL ACTIVITIES .............................................................................................................. 15
5. GEOTECHNICAL CONSIDERATIONS AND PRELIMINARY RECOMMENDATIONS .........................17
6. RECOMMENDATIONS FOR FURTHER STUDY...........................................................................19
7. LIMITATIONS.........................................................................................................................20
8. REFERENCES ..........................................................................................................................20 List of Figures
FIGURE 1: VICINITY MAP .............................................................................................................................................. 1 FIGURE 3: POWERSCREEN FOR SAND/CLAY SEPARATION (MAY 2012)................................................................................. 5 FIGURE 2: POND 12 REHABILITATION (OCTOBER 9, 2018) ................................................................................................ 5 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 iii
FIGURE 4: DRY WELL INSTALLATION - POND 6 - 2019 (RUSS NEWMAN, CITY OF SANTA MARIA) ............................................. 6 FIGURE 5: GEOLOGIC MAP (TENNYSON 1992)............................................................................................................... 10 FIGURE 6: HYDRAULIC CONDUCTIVITIES AND DRAINAGE CHARACTERISTICS (CASAGRANDE AND FADUM 1940)......................... 12 FIGURE 7: ORGANIC SCUM LAYER ................................................................................................................................ 13 FIGURE 8: POND 14, TEST PIT 10 ................................................................................................................................ 14 FIGURE 9: POND 14 – CLAY LAYERS 30-35 FEET BGS ..................................................................................................... 15 FIGURE 10: TOTAL INFILTRATION (S) IN RELATION TO SUSPENDED SOLIDS CONCENTRATION (CS) – RICE 1974.......................... 16 FIGURE 11: PROPOSED POND LOCATIONS – EAST OF BLACK ROAD .................................................................................... 19 List of Tables
TABLE 1: PREVIOUS STUDIES.......................................................................................................................................... 3 TABLE 2: POND INVENTORY........................................................................................................................................... 7 TABLE 3: SUMMARY OF SIEVE ANALYSES AND HYDRAULIC CONDUCTIVITIES......................................................................... 12 TABLE 4: COST ESTIMATES .......................................................................................................................................... 18 List of Plates
Subsurface Exploration Map (General)................................................................................................................... 1 Subsurface Exploration Map (East of Black Road) .................................................................................................. 2 Subsurface Exploration Map (SE)............................................................................................................................ 3 Subsurface Exploration Map (NE) ........................................................................................................................... 4 Subsurface Exploration Map (NW).......................................................................................................................... 5 Plant Timeline.......................................................................................................................................................... 6 Qualitative Pond Performance Map ....................................................................................................................... 7 Subsurface Profile A-A’............................................................................................................................................ 8 Subsurface Profile B-B’ ............................................................................................................................................ 9 Subsurface Profile C-C’..........................................................................................................................................10 Subsurface Profile D-D’ .........................................................................................................................................11 Subsurface Profile E-E’ .......................................................................................................................................... 12 Subsurface Profile F-F’...........................................................................................................................................13 Subsurface Profile G-G’ .........................................................................................................................................14 List of Appendices
Appendix A – Boring Logs, Test Pit Logs, and CPT Plots
Legend for Soil Classification.................................................................................................................. A-1 Boring Logs for Pond 4 (24E4-01 through 24E4-04).................................................................... A-2 to A-9 Boring Logs for Pond 6 (24E6-01 through 24E6-05)................................................................ A-10 to A-19 Boring Logs for Pond 14 (24E14-01 through 24E14-04) ......................................................... A-20 to A-27 Test Pit Logs for Pond 2 (24TP2-01 through 24TP2-08).......................................................... A-28 to A-35 Test Pit Logs for Pond 4 (24TP4-01 through 24TP4-07).......................................................... A-36 to A-42 Test Pit Logs for Pond 6 (24TP6-01 through 24TP6-09).......................................................... A-43 to A-51 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 iv
Test Pit Logs for Pond 8 (24TP8-01 through 24TP8-03).......................................................... A-52 to A-54 Test Pit Logs for Pond 11 (24TP11-01 through 24TP11-05).................................................... A-55 to A-59 Test Pit Logs for Pond 14 (24TP14-01 through 24TP14-14).................................................... A-60 to A-73 CPT Plot 24CPT-01 through 24CPT-30................................................................................... A-74 to A-103 Appendix B – Results of Laboratory Testing
Summary of Laboratory Test Results........................................................................................... B-1 to B-3 Sieve Analyses............................................................................................................................ B-4 to B-14 Hydrometer Analyses.................................................................................................................. B-15 to 30 Atterberg Limits ................................................................................................................................... B-31 Organic Content.......................................................................................................................... B-32 to 33 Hydraulic Conductivity ................................................................................................................ B-34 to 49 Appendix C – Historical Aerial Photos
EDR Decade Package.................................................................................................................. C-1 to C-18 Appendix D – Previous Studies and Pertinent Data
Data from 2003 ESP Pond Expansion Report............................................................................ D-1 to D-44 Data from 2006 Fugro Phase II Plant Upgrade Report including previous studies................. D-45 to D-96 Data from 2008 Fugro Pond Lithology .................................................................................. D-97 to D-100 Data from 2008 Fugro Pond Rehabilitation Report............................................................ D-101 to D-120 Data from 2011 Fugro Ponds 3 and 4 Report ..................................................................... D-121 to D-146 Data from 2018 Yeh Pond 12 Report.................................................................................. D-147 to D-175 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 1 1. PROJECT DESCRIPTION AND
UNDERSTANDING
Carollo retained Yeh and Associates to
provide geotechnical services as input to
GSI’s hydrogeologic study of the existing
percolation ponds at the City of Santa
Maria’s (City) wastewater treatment plant at
601 Black Road in Santa Maria, California.
The project location is shown in Figure 1.
The geotechnical evaluation consisted of a
program of project coordination, site
reconnaissance, field exploration, laboratory
testing, and preliminary analyses of the
subsurface conditions and operation of the
ponds from a geotechnical perspective. Yeh
prepared a Geotechnical Memorandum (Yeh
2024) that summarized previous studies, site
reconnaissance observations and presented
a plan for subsurface exploration of the
site. Selected data from that
memorandum is included in this report.
1.1 PROJECT DESCRIPTION
The project consists of a hydrogeologic study of the capacity and performance of fifteen existing percolation ponds at the Santa Maria Wastewater Treatment Plant (WWTP). Plant staff have reported that the existing approximate 85 acres of percolation ponds are currently not adequately percolating treated effluent based on pond level measurements and influent flow. The City periodically allows the ponds to dry and then aerates them with a disk to a depth of about two feet and then refills them. A contractor initially removed an organic scum layer that forms on the bottom of the ponds, but that is no longer being performed. The percolation performance of the ponds could impact the amount of wastewater the plant can process. The goal of the project is to evaluate subsurface conditions and operational characteristics of the existing disposal ponds to develop options for improving percolation potential. A proposed expansion area on the east side of Black Road was also explored but not evaluated as part of the scope for this phase of the project. This area is planned to be addressed in a future phase of work.
Figure 1: Vicinity Map
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 2 1.2 EXISTING SITE DESCRIPTION
The City of Santa Maria’s Wastewater Treatment Plant (Plant) is located west of Black Road in Santa Maria, California as shown on Figure 1. The existing facility has a design operating capacity of 13.5 MGD with average 2023 flows of 7.68 MGD (City 2024a). The plant was originally constructed in the 1930s with upgrades to the plant in the 1960’s, 1990’s and a recent upgrade in 2007. A potential expansion area for new ponds and or an entire new plant facility is located on the east side of Black Road east and southeast of the existing plant. The site is bordered by Stowell Road to the south, Ray Road to the west, and agricultural land to the north and east. Land use in the site vicinity is primarily agricultural. A composting facility occupies the southwestern portion of the plant site.
Topography in the project vicinity is defined by relatively flat with natural grades generally sloping north toward the Santa Maria River at grades of approximately five percent. The ground surface elevation at the project site ranges from approximately elevation 132 feet to 168 feet (City 2024b).
Gravel roads are located throughout the site to provide access to the ponds and the WWTP.
1.3 AERIAL PHOTOGRAPH REVIEW
Historic aerial photographs taken between 1938 and 2020 (about one to two per decade) were obtained from Environmental Data Resources, Inc. (EDR 2024) and reviewed for this project. Those photos were reviewed to evaluate changes in land use, topography, geomorphic features, and other characteristics pertinent to the site geology and geotechnical considerations discussed in this report.
The aerial photos from EDR are provided in Appendix C with the project area shown on each photo.
The following observations were made during the review:
• The 1938 and 1943 photos show a structure in the east area of the site and horizontal lines west of the existing plant facility that are likely disposal trenches for effluent. The primary land use surrounding the site appears to have been agricultural. • Two new clarifiers or filters and an earthen rectangular basin are present in the 1949 photo and roads are present around the new plant. The effluent disposal area west of the new plant continues to be disposal trenches and possibly spray fields. • A pond is present immediately west of the plant in the 1954 photo and no other changes are observed in the remaining portion of the site.
• Three ponds are present in the 1960 photo. Two ponds, possibly used for irrigation, are about 2,000 feet west of the plant and one pond is about 2,500 feet southwest. The spray fields have been developed with diagonal lines that are likely irrigation pipes used in the distribution of effluent.
• The 1967 photo shows two additional clarifiers and two trickling filters have been added to the plant. The sludge drying beds have also been constructed immediately west of the expanded plant. Ten ponds have been constructed immediately west of the plant site. The three ponds observed in the 1960 photo are no longer present. Spray fields remain along the southern boundary.
• No significant changes are observed in the 1975 and 1978 photos.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 3 • In the 1981 photo, additional sludge drying beds and four ponds have been added to the eastern half of the plant area. Ponds 1 through 8 are now visible. Sixteen square ponds have been constructed west of the main portion of the plant. • No significant changes are visible in the 1994 photo. • In the 2002 photo, eight of the smaller ponds in the southwestern portion of the site have been transformed to a composting facility and four ponds remain in that area. Five additional ponds have been constructed in the northwest area of the site. Water is present in 15 of the 18 ponds that are visible in the photo.
• No significant changes are visible in the 2006 photo. • Two small ponds that were located immediately east of the compost facility are no longer present in the 2009 photo. Additional structures are also visible within the main portion of the plant which were a part of a 2007 upgrade at the plant. A berm has been constructed on the north end of Pond 7 separating it from the DKC pond. • No significant changes are visible in the 2012 photo. • The compost facility has expanded eastward, and two ponds have been removed in the 2016 photo leaving 15 ponds visible. Water is in all but two ponds. • No significant changes are visible in the 2020 photo.
1.4 PREVIOUS STUDIES
Yeh reviewed previous studies and geotechnical data prepared for the existing ponds and the WWTP facility as input to this study. Maps showing the locations of previous explorations and explorations performed by Yeh for this study are shown on Plates 1 through 5. A plant timeline including previous studies, plant improvements, pond construction, and significant rain events is shown on Plate 6.
Previous studies reviewed are summarized in Table 1 and selected boring logs, trench logs and laboratory data from these studies are included in Appendix D.
Table 1: Previous Studies
Report Area of Study Exploration
Performed Summary of Findings
Soils Engineering
Report for Percolation
Pond Expansion, Earth
Systems Pacific (2003)
Area of proposed
pond expansion
east of Black Road
7 borings to depths
of 51.5 to 60 feet
below the ground
surface.
Alluvium encountered in borings consisted of
poorly-graded Sand (SP) and Clayey Sand (SC)
with layers of Silt (ML) approximately 1 to 10 feet
thick at various elevations of approximately 112
to 165 feet. Hydraulic conductivity ranged from
approximately 2.6E-08 to 1.2E-03 cm/s in silty
materials and from approximately 1.2E-05 to
1.0E-02 cm/s in sandy materials.
Geotechnical Report
for Santa Maria WWTP
Upgrades – Phase II,
Fugro (2006)
Treatment Plant
Area
13 borings to
depths of 20.5 to 51
feet below the
ground surface
Alluvium encountered in borings consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) and layers of Silt
and Clay (CL, ML, and CL-ML) approximately 1 to
18.5 feet thick at various elevations of
approximately 124.3 to 164.7 feet. Hydraulic
conductivity of samples of Silty Sand (SM) and
poorly-graded Sand with Silt (SP-SM) ranged
from approximately 2.0E-05 to 4.0E-03 cm/s.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 4 Report Area of Study Exploration
Performed Summary of Findings
Geotechnical Report
for Percolation Pond
No. 1 Rehabilitation,
Fugro (2008)
Pond No. 1
16 test pits to
depths of 3 to 15
feet below the
ground surface
Alluvium encountered in test pits consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) with layers of Clay
(CL and CH) approximately 1 to 4.5 feet thick at
various elevations of approximately 142.5 to 149
feet. Hydraulic conductivity ranged from
approximately 7.6E-03 to 8.1E-02 cm/s.
Percolation Pond
Lithology and
Materials Assessment,
Fugro (2008)
Treatment Plant
Area and Ponds
No. 1, 2, 5, and 7
11 borings to
depths of 8.3 to
30.5 feet below the
ground surface
Alluvium encountered in borings consisted of
Poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SC, SP-SM) with layers of Clay
and Silt (CL, ML, and MH) approximately 0.5 to 4
feet thick at various elevations of approximately
131 to 163 feet. Hydraulic conductivity ranged
from approximately 1.6E-06 to 1.2E-02 cm/s.
Geotechnical Report
for Percolation Ponds
No. 3 and 4, Fugro
(2011)
Ponds No. 3 and 4
16 test pits to
depths of 5 to 15
feet below the
ground surface
Alluvium encountered in test pits consisted of
Poorly-graded Sand with varying amounts of Silt
(SP, SM, SP-SM) with layers of Clay and Silt (CL
and ML) approximately 1 to 9.5 feet thick at
various elevations of approximately 145 to 165
feet. Hydraulic conductivity ranged from
approximately 7.1E-06 to 6.1E-03 cm/s.
Geotechnical Report
for Percolation Pond
No. 12 Rehabilitation,
(Yeh 2018)
Pond No. 12
16 test pits to
depths of 7 to 12
feet below the
ground surface
Alluvium encountered in test pits consisted of
poorly-graded Sand with varying amounts of Silt
and Clay (SP, SM, SP-SM, SP-SC) with layers of
lean Clay (CL) approximately 0.5 to 3.5 feet thick
at various elevations of approximately 131.5 to
139 feet.
The findings from these studies show that drainage, capacity, and pond performance have continually been issues at the plant and need to be addressed in order for the ponds to dispose of treated water from the plant.
1.5 REHABILITATION EFFORTS
The City has performed various efforts to rehabilitate or improve the percolation of the ponds over the past 20 years. A summary of projects and estimated percolation rates are provided in Section 1.6 and Table 2. Efforts have included the following:
• Removing approximately 5 feet of soil from the bottom of ponds and replacing the excavated soil with imported sandy soil. Plant staff stated that the removal and replacement was performed in the early 2000’s for Ponds 1 through 3 (Wallace 2011) and in 2018 for the western half of Pond 12. A photo of Pond 12 that was rehabilitated in 2018 is shown in Figure 2. These efforts have improved the percolation of the ponds relative to the ponds that did not receive any rehabilitation efforts.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 5 • Removing the scum layer from the
bottom of the ponds following
percolation. The City had retained a
contractor to scrape and remove the
upper 2 to 6 inches of soil from the
ponds about 1 to 2 weeks after use and
once the bottom of the pond had dried.
The intent of this process was to remove
an organic scum layer that typically
forms and remains on the surface soil at
the bottom of the pond following
percolation. The City no longer has a
contractor for these services and the City has resumed discing the organic layer back into the upper 1 to 2 feet of the soil in the pond bottoms after each drying cycle. The previously rehabilitated ponds initially performed better than other ponds, but percolation rates have slowed according to the City. Not removing the scum layer has likely contributed to the reduced percolation potential.
Figure 3: Pond 12 Rehabilitation (October 9, 2018)
Figure 2: Powerscreen for Sand/Clay Separation (May 2012) Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 6 • Processing a portion of soil within the ponds using a sand/clay separator. This was performed in Ponds 1, 2, 3, and 5 in 2012 in an effort to remove fines from the pond subgrade. The soil within the upper 5 feet of the pond bottom was processed using a Cheiftan 17001 and then through a Powerscreen Trident 1 to separate clay and sand particles in a water bath. The City has referred to this equipment at “The Beast”. The clay soil was segregated and disposed of within the berms around various ponds while sandy soil from the berms was placed back into the bottom of the ponds to supplement the processed subgrade material. A photo of the machine is included in Figure 3. This effort did improve the percolation potential of the ponds that were rehabilitated.
• Installing dry wells to depths of about 20 feet in Pond 6 in 2019. According to an email from Mr. Russ Newman, the Plant Manager, four, 30-inch diameter dry wells were constructed in the northern bottom of Pond 6 in 2019. The wells were constructed by drilling holes and backfilling them with imported sand. A photo of the drill rig and one of the open holes prior to sand placement is shown in Figure 4. We understand that there wasn’t a discernable percolation rate improvement after this method was used according to plant staff.
1.6 POND PERFORMANCE
Yeh requested information about the performance of each pond from plant staff. Mr. Newman provided qualitative information as well as quantitative data about the performance of the ponds.
Details about each pond’s construction date, rehabilitation, and percolation performance reported by Mr. Newman to Yeh in 2023 are presented in Table 2. “N/A” indicates that no information was reported for those ponds or items. A map summarizing pond performance is shown on Plate 7. 1 https://www.powerscreen.com/en/equipment/screening/inclined-screens Figure 4: Dry Well Installation - Pond 6 - 2019 (Russ Newman, City of Santa Maria) Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 7 Table 2: Pond Inventory
Pond ID
Approximate Pond
Construction Timeframe
(according to aerial imagery –
See Appendix C)
Reference Reports Rehabilitation
Performed
Estimated
Percolation rate
in 2023 (City of
Santa Maria)
In/day
1 1960 - 1967
Pond 1 Rehab, Fugro (2008)
Lithology and Materials
Report, Fugro (2008)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-8 in/day
2 1978 - 1981 Lithology and Materials
Report, Fugro (2008)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-7 in/day
3 1960 - 1967 Fugro (2011)
Sand/Clay Separator:
2012
Unknown method:
2001 and 2018
5-7 in/day
4 1978 - 1981 Fugro (2011) N/A 2-4 in/day
5 1960 - 1967 N/A
Sand/Clay Separator:
2012
Unknown method:
2018
5-6 in/day
6 1978 - 1981 N/A Dry wells installed in
2019 2-4 in/day
7 1960 - 1967 Lithology and Materials
Report, Fugro (2008) N/A 2-4 in/day
8 1978 - 1981 N/A N/A 2-4 in/day
9 1994 - 2002, Decommissioned
2012 - 2016 N/A N/A N/A
10 1994 - 2002, Decommissioned
2012 - 2016 N/A N/A N/A
11 1994 - 2002 N/A N/A 3-5 in/day
12 1994 - 2002 Yeh (2018) Clay lens removed from
eastern half in 2018 4-5 in/day
13 1994 - 2002 N/A N/A 3-4 in/day
14 1994 - 2002 N/A N/A 2-4 in/day
15 1994 - 2002 N/A N/A 3-5 in/day
DKC 1994 - 2002 N/A N/A 4-6 in/day
Wash
Pond A 2009-2012 N/A N/A 2-3 in/day
2. FIELD EXPLORATION AND LABORATORY TESTING
Yeh performed a field exploration program that included drilling, Cone Penetration Test (CPT) soundings, and test pits as well as laboratory testing of selected samples recovered from the test pits and borings. Exploration locations for this project and the previous studies mentioned above are shown on Plates 1 to 5. Boring, CPT, and Test Pit logs, and laboratory test results are included in appendices A and B. Yeh’s field exploration within the pond bottoms focused on poor performing Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 8 ponds (Ponds 4, 6, 8, 11, and 14) and better performing ponds (Ponds 2 and 11) to evaluate the boundary conditions.
2.1 CONE PENETRATION TESTING
CPT services for the project were provided by Gregg Drilling of Signal Hill, California. Gregg advanced 30 CPT soundings during the period of March 18 to 21, 2024. The soundings were advanced to depths of approximately 30 to 65 feet below the ground surface using a hydraulic ram mounted inside a 20- ton truck.
The CPT soundings were performed in general accordance with ASTM D 5778-12 using an electric piezocone penetrometer. The piezocone had a diameter of approximately 1.8 inches (4.5 centimeters), a tip area of 15 square centimeters, and a sleeve area of approximately 225 square centimeters. Cone tip resistance (qc), sleeve friction (fs), and penetration pore water pressure (u) measured from a transducer placed behind the tip (in the u2 location) were recorded continuously during penetration using an on-board computer. The friction ratio (FR, the ratio of the sleeve friction to the tip resistance in percent) was computed for each value of qc and fs recorded. These data and soil behavior type classifications were used in subsequent geotechnical analyses and to evaluate soil types and boundaries for analyses. Approximate locations of the CPT soundings are presented on Plates 1 to 5. A report and logs of the CPT soundings are presented in Appendix A.
2.2 TEST PITS
Backhoe services for the test pits for this project were provided by Joseph Engineering of Santa Maria, California. Joseph excavated 46 test pits throughout the project site. Test pits were excavated for Pond 2 on March 27, Pond 14 on April 3, and Ponds 4, 6, 8, and 11 on April 25 to 26. Test pits were excavated to depths of approximately 4.5 to 12 feet below the ground surface with a John Deere 310 Backhoe. The test pits are labeled with the year of exploration, the pond number and the test pit number. For example, 24TP2-01 is test pit number one, dug in pond 2, in 2024. Approximate locations of the test pits are presented on Plates 1 to 5. Logs of the test pits are presented in Appendix A.
2.3 DRILLING
Drilling services were provided by Britton Exploration of Los Gatos, California. Britton used a track mounted CME 55 drill rig equipped with 8-inch hollow stem augers to advance 13 exploratory borings to depths of 31 to 34.5 below the ground surface between June 24 and 26, 2024 in Ponds 4, 6, and
14. Yeh personnel logged the subsurface conditions encountered during the drilling and collected samples for subsequent laboratory testing. Sampling within the borings (with the exception of 24E6- 05) was performed by using a CME continuous coring system in conjunction with taking drive samples. Boring 24E6-05 was sampled with continuous drive samples beginning at a depth of 1 foot.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 9 The CME core is a fixed sampler that is pushed into the ground as the augers remove the soil and rock from around the barrel during drilling. The sampler is 5 feet long with a 4-inch outside diameter and a
2.75-inch core diameter. The split barrel was oriented to provide reference to north. Samples from the recovered core are disturbed and mainly used for classification, although intact specimens were sometimes taken from the core for testing. Approximately 6-inch-long samples were trimmed from the core in the field, placed wrapped in plastic, and labeled. The length of the core and recovery were noted and are shown on the logs in Appendix A.
Drive samples were collected using either a modified California or standard penetration test (SPT) split spoon sampler at intervals of 5 feet. The SPT sampler has a 2-inch outside diameter, a 1-3/8 inch inside diameter and is equipped for but was used without liners. The modified California sampler has a 3-inch outside diameter, a 2-3/8 inch inside diameter and was used with 1-inch-high brass liners.
Drive samples were collected using a 140-lb automatic trip hammer in accordance with ASTM D-1586 (the Standard Penetration Test) procedures. Upon completion, the borings were backfilled with native material.
The borings are labeled with the year drilled, the pond number, and the boring number. For example, 24E6-05 is boring 5, drilled in Pond 6, in 2024. Maps showing the approximate locations of the borings are presented on Plates 1 to 5. The logs of the borings are presented in Appendix A.
2.4 LABORATORY TESTING
Laboratory testing was performed on selected samples recovered from the test pits and borings. Test results are presented in Appendix B. Selected tests for unit weight, moisture content, gradation, and pH and resistivity were performed at the Yeh office and laboratory in Grover Beach, California. Tests for organic content were performed at Cooper Testing Labs in Palo Alto, California. Tests for hydraulic conductivity and gradation were performed on soil samples at the California Polytechnic State University Geotechnical Engineering Lab in San Luis Obispo, California. All testing was performed in accordance with applicable ASTM standards.
3. SUBSURFACE CONDITIONS
3.1 REGIONAL AND SITE GEOLOGY
The regional geology in the site vicinity as mapped by Tennyson (Tennyson 1992) is shown on Figure 5. The project site is located within the Coast Ranges geologic and geomorphic province, which extends from the Transverse Ranges in southern California to the Klamath Mountains in northern California and into Oregon. The province is characterized by north-northwest trending mountain ranges composed of sedimentary, volcanic, and metamorphic formations comprised predominately of Jurassic and Cretaceous age rocks with Tertiary to Quaternary age rocks commonly overlying the Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 10 older formations along the flanks and foothills of those ranges. Recent sediments of alluvium and colluvium are found above the rock within intervening drainages, valleys, and coastal areas.
Regional-scale geologic structure is characterized by a series of northwest trending faults that are mostly associated with compression occurring between the Pacific Ocean and the Transverse Range.
Locally mapped faults include the Santa Maria Fault, the Bradley Canyon Fault, and the Garey Fault (USGS 2024). The Santa Maria Fault is mapped as trending northeast approximately 3 miles east of the project site, the Bradley Fault is mapped as trending north approximately 6 miles east of the project site, and the Garey Fault is mapped as trending north approximately 7.5 miles southwest of the project site. The site is mapped by Tennyson (1992) as Quaternary aged alluvium (Qal). The site is also mapped by Dibblee (Dibblee 1994), but the project site is obscured on that map by an information text block, hence why the Tennyson (1992) map is used in Figure 5, but it is presumed to also be mapped as Quaternary aged valley floodplain alluvium (Qa).
3.2 SUBSURFACE CONDITIONS
3.2.1 GEOLOGIC UNITS
Yeh’s subsurface characterization is based on the subsurface conditions logged in the test pits, borings, and CPTs performed by Yeh and previous studies. The approximate locations of the borings Figure 5: Geologic Map (Tennyson 1992)
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 11 and subsurface profiles are presented on Plates 1 to 10. Artificial fill (Af) and Alluvium (Qal) were encountered within the explorations and are described below. Interpreted subsurface profiles A-A’ to E-E’ showing the units encountered are presented on Plates 6 to 10.
Artificial Fill (Af). The berms surrounding the ponds consist of artificial fill. The unit was not encountered in the test pits and borings but was encountered in the CPTs. The unit consisted mainly of sand with varying amounts of silt and clay. The alluvium was encountered below the fill to the maximum depths explored. Artificial fill is also present within the bottom of ponds as a result of original pond construction and rehabilitation efforts.
Alluvium (Qal). Alluvium was encountered in all the test pits and borings from the ground surface to the maximum depth explored of 34.5 feet below the ground surface. The unit was also encountered in the CPT soundings from near the elevation of the pond bottoms to the maximum depths explored of 65 feet below the ground surface. The alluvium consisted of very loose to dense poorly to well graded sand with varying amounts of clay and silt (SP, SW, SC, SC-SM, SP-SM SP-SC, SW-SC), soft sandy silt (ML), and intermittent discontinuous layers of very soft to stiff lean to fat clay and silty clay (CH, CL, CL-ML).
3.2.2 GROUNDWATER CONDITIONS
Groundwater was encountered in borings 24E4-02 to -04, and 24E6-01, -02, and -05 at depths of 20 to 30 feet below the ground surface (approximately elevation 116 to 125 feet). Depth to groundwater in monitoring wells DWM-1 and DWM-2 located at the plant varied (see Plate 1) from 87 to 125 feet below the ground surface (approximate elevation 35 to 73 feet). However, we understand that the screened intervals of these wells are within a lower aquifer. Perched water was also observed immediately above clay layers within the test pits. Seepage from inundated ponds into dry ponds was also noted. The perched water is likely remnant from the percolation of effluent from the ponds.
Overall, soil moisture and groundwater conditions will vary seasonally and due to variations in storm runoff, irrigation, groundwater pumping, and pond disposal in the site vicinity.
3.3 SUMMARY OF LABORATORY TESTS
Mechanical sieve analysis and hydrometers were performed on 29 samples collected from the test pits and borings. Hydraulic conductivity testing was performed on sixteen of the samples tested for sieve analyses. Test results are summarized in Table 3. Values highlighted in red are considered low permeability: essentially impervious relative to pond percolation rates. Well-drained materials are typically those soils having hydraulic conductivity of 10-3 centimeters per second or faster. The table includes values from the current study and Fugro’s 2008 and 2011 studies (Fugro 2008a, Fugro 2011).
Figure 6 provides typical hydraulic conductivity values based on soil type (Casagrande and Fadum 1940). The range of hydraulic conductivity for the well-draining ponds at this site are highlighted in Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 12 green and the range for the poorly draining ponds are highlighted in red. Based on the comparison of the calculated and typical values, it appears that the test results correlate to the typical value ranges.
Table 3: Summary of Sieve Analyses and Hydraulic Conductivities Pond No. Test
Pit/Boring
No.
Depth
(ft)
Soil Type Gravel
(%)
Sand (%) Fines
(%)
Hydraulic
Conductivity
(cm/sec)
4 24E4-01 20 4” Poorly Graded SAND with
1” layer of lean CLAY
0 73 27 1.3 x 10-6
4 24E4-01 30 Poorly Graded SAND with Silt 0 95 5 9.1 x 10-3 6 24E6-02 30 Sandy lean clay 0 45 55 2.3 x 10-7
6 24E6-03 30 Silty SAND 0 59 40 1.1 x 10-5
14 24E14-01 30 Sandy lean clay 0 39 61 2.5 x 10-6
14 24E14-02 25 Poorly graded sand 0 97 3 9.6 x 10-3
2 24TP2-02 2 Poorly graded sand -- -- -- 1.9 x 10-3
2 24TP2-04 2 Poorly graded sand -- -- -- 6.4 x 10-4
6 24TP6-01 4 SILT -- -- -- 1.2 x 10-6
6 24TP6-06 3.5 Poorly graded sand -- -- -- 1.3 x 10-2
6 24TP6-07 3 Silty CLAY -- -- -- 5.4 x 10-7
6 24TP6-09 3 Sandy SILT -- -- -- 6.8 x 10-4
11 24TP11-05 5 Sandy SILT -- -- -- 6.8 x 10-4
14 24TP14-04 4 Sandy Fat CLAY -- -- -- 5.0 x 10-7
14 24TP14-07 3.5 Silty CLAY with Sand -- -- -- 1.9 x 10-7 14 24TP14-11 2.5 Sandy Fat CLAY -- -- -- 1.8 x 10-7
1 Fugro T4 7.5 Poorly graded SAND with silt -- -- 10 7.6 x 10-3 1 Fugro T5 2 Poorly graded sand -- -- 1 2.7 x 10-2
1 Fugro T9 2 Poorly graded sand -- -- 1 8.1 x 10-2
1 Fugro T16 8.5 Poorly graded sand -- -- 2 4.2 x 10-2
3 Fugro T3-5 5 Poorly graded sand -- -- 2 3.1 x 10-3
3 Fugro T3-
L2 4 Silty sand -- -- 14 6.9 x 10-4
4 Fugro T4-6 5 Lean clay -- -- -- 7.1 x 10-6
4 Fugro T4-7 8 Poorly graded sand with silt -- -- 9 6.1 x 10-3 a.a x 10-z Material considered to have poor to practically impervious drainage capabilities (see Figure 6) Figure 6: Hydraulic Conductivities and Drainage Characteristics (Casagrande and Fadum 1940) Green zone is good permeability; light red is poor permeability.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 13 4. OBSERVATIONS AND CONCLUSIONS
Below is a summary of Yeh’s observations from our analysis of the previous and current studies’ explorations.
4.1 TEST PITS
Test pits were excavated in various ponds in coordination with the City. Once the ponds were allowed to dry a total of 46 test pits were excavated within Ponds 2, 4, 6, 8, 11, and 14 to depths up to 10 feet. The following was noted in the test pit excavations:
• An organic scum layer was present across the bottom of the ponds. Once the ponds dry the organic material desiccates and cracks similar to fine grained soil. Testing of selected samples of the material had organic contents that ranged from near zero to over 56 percent. The organic layer is estimated to have a thickness of about 0.25 inches. Photos of the material at the bottom of a pond is shown in Figure 7 in both the wet and dry condition. Organic material is not solely the controlling factor regarding how well a pond will percolate. However, as the silt and clay from the organic matter is mixed into the underlying sand resulting in increased fines that reduce the percolation rate of the soil at pond bottom. For instance, if the upper 1- Figure 7: Organic Scum Layer
(left: wet condition, right: dry condition)
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 14 foot of the pond is poorly graded or well graded sand, it is estimated that after about five drying and mixing cycles the soil will transition to silty or clayey sand. The surface soil will eventually become clay or silt after additional cycles of drying and mixing which were observed in the test pits. The percolation performance is being impacted by not removing the organic layer that forms from effluent disposal.
• Material exposed in the test pits varied from poorly graded sand (dark brown to black soil in Figure 8) to sandy lean clay (light gray to brown). The predominant material was generally sandy; however, layers of clay and silt were found within the test pits which even extended across some of the ponds. However, these layers were generally discontinuous across the approximate 85 acres of ponds based on subsurface data. Perched water or saturated soil conditions were observed immediately above some of the layers of clay and silt. The clay and silt layers are impacting the ability of the ponds to dispose of effluent by acting as aquitards to the vertical movement of water.
• Sandy soil in the test pits was black in many
areas. This is due to the amount of organic
material or Total Suspended Solids (TSS) from
the effluent, nitrogen consumption and
chemical interactions of the constituents of the
effluent with the soil. Studies have shown that
increased TSS from effluent increases bacterial
growth and reduces soil percolation. The soil
and water chemistry of the disposal process is
complex (Vandevivere and Baveye 1992).
• Ponds are dried by pumping the remaining
effluent to a different pond and allowing the
pond to sit for a period of one to two weeks
while it dries. Desiccation cracks form in the
bottom of the ponds once the ponds are dried. Desiccation cracking indicates an increase in the clay and silt (fines). The increase in fines content is attributed to the organic scum layer that was observed in ponds following percolation and has then been disked into the soil at the bottom of the pond as part of routine operations.
Figure 8: Pond 14, Test Pit 10
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 15 4.2 EXPLORATORY DRILLING AND CPT SOUNDINGS
Thirty CPT Soundings and thirteen exploratory borings were advanced below the ground surface at the site. CPT soundings were constrained to the berms surrounding the ponds while borings were drilled within the bottom of Ponds 4, 6, and 14. The depths of the CPT soundings varied from approximately 30 to 65 feet below the ground surface and the depths of the borings ranged from approximately 31 to 34.5 feet below the ground surface.
Similar subsurface conditions were encountered as within the test pits. Clay and silt layers were commonly encountered to depths of approximately 10 feet below the bottoms of the ponds but were also encountered within borings and CPTs at depths greater than 10 feet below the pond bottoms.
Subsurface profiles including the estimated extents of the predominant clay and silt layers encountered are shown on Plates 9 through 12. A photo of a sample from a clay layer encountered from 30 to 35 feet in a boring in Pond 14 is shown in Figure 9, indicated by the purple arrows.
4.3 OPERATIONAL ACTIVITIES
Yeh met with City staff to inquire about plant operations and methods used to move water between ponds, maintenance of ponds, and pond performance. The following summarizes some of the key points from those discussions and Yeh’s observations.
• Plant staff use surface pumps and sumps to transfer water between ponds as part of the cycling of the percolation process. Sumps are low spots excavated into the bottom at the low end of each pond. Water is pumped from these sumps and transferred to other ponds. As the water level drops in the ponds the Total Suspended Solids (TSS) content becomes higher than the initial TSS of the effluent being pumped into the ponds due to disturbance in the bottom of the pond where the organic scum layer has collected. Transferring the water (as shown in Figure 9: Pond 14 – Clay Layers 30-35 feet BGS
Purple arrows identify clay layers.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 16 the left photo of Figure 7) towards the end of the pond cycle moves water with a higher TSS than the plant effluent to other ponds. High TSS water is being transferred from one pond to another without reducing the TSS which is likely contributing to the poor percolation performance of the ponds.
• Once the ponds are in a dry condition, the ponds are disced using a tractor to pull a harrow across the ponds and break up the organic layer within the upper 2 to 3 feet of the bottom of the ponds. The bottom of the ponds is then graded to slope to the transfer sump and the pond is then placed back in service. We understand that this process takes about two to three weeks to complete depending on the time of year, with a shorter amount of time needed to complete the operation in the summer and fall.
• The 2023 average TSS of effluent from the plant entering the percolation ponds was 41 milligrams per liter (City 2024a). The bottom of the ponds act as a filter where a portion of the suspended solids are retained which leads to the formation of the organic layer across the bottom of the ponds that ranges up to 0.25 inches thick. Research on the impact of TSS on percolation capabilities has shown that there is a decrease in the ability for effluent to move through soil as the TSS increases above 5 milligrams per liter (Rice 1974). A plot from Rice (1974) comparing the decrease in infiltration rate (S) to an increase in TSS (Cs) is shown in Figure 10: Total Infiltration (S) in relation to suspended solids concentration (Cs) – Rice 1974 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 17 Figure 10. The purple arrow points to the average TSS of Santa Maria’s WWTP effluent entering the ponds for disposal in 2023. Additional discussion of impact of effluent quality on percolation potential is provided in the EPA Process Design Manual for Land Treatment of Municipal Wastewater Effluents (EPA 2006).
5. GEOTECHNICAL CONSIDERATIONS AND PRELIMINARY RECOMMENDATIONS Yeh met with the City, Carollo and GSI Water on March 20, 2024, to discuss findings of our preliminary data review and research. Improving the percolation performance of the ponds to meet new plant demands for the City will need to address several factors including effluent quality, operational activities, and capital investment. The following considerations and recommendations should be included in continued plant operations and budgets by the City to improve and maintain percolation pond performance. The City is working with Carollo and GSI Water to estimate the overall percolation capacity and future expansion for the plant and disposal quantities. • Update the operations and maintenance manual (City 2024c) for the plant to include removal of the upper 2 to 4 inches of soil including the organic layer that forms after they are dried. • Perform deep ripping of the bottom of the ponds after the organic scum layer has been removed each time the ponds are dried.
• Plan and budget for phased removal of clayey and silty soil present within the upper 5 to 10 feet of ponds. Prior removal and replacement of clayey and silty soil from the upper 5 feet of Ponds 1, 2, 3, and 5 with well drained sand in 2012 did improve the percolation performance according to Plant staff. A phased approach would allow for the City to obtain data and evaluate the performance of the clay and silt removal program. Documentation, sampling, and testing of the soil from the pre- and post-removal process should be performed to allow the operative percolation rates being achieved to be estimated and whether percolation goals are being met. Cost estimates for the budget are displayed in Table 4 below. The following assumptions should be considered for this table:
a. Water will be provided to the contractor for the plant. b. Laydown and decanting/sludge pond area will be required c. Sludge/fines can be disposed of on-site and no offsite hauling is anticipated d. Prevailing wager
e. Estimated costs are for budgeting purposes only
f. Plant staff will have pond(s) dries out so that equipment can traverse bottom of ponds Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 18 g. Mobilization/Demobilization/Set up of plant estimated at $200,000 Table 4: Cost Estimates
Pond ID
Approximate
Pond
Construction
Timeframe
(according to
aerial
imagery –
See Appendix
C)
Estimated
Percolatio
n rate in
2023 (City
of Santa
Maria)
In/day
Pond
Area,
Empty
(acres)
Pond
Area,
Empty
(ft2)
Excavation
Removal
of 5 feet,
Volume
(yds3)
Days for
Processing
(1,200
yds/day)
Processing/
transport
Estimate,
not including
Mob
Cost per
Yard (not
including
Mob)
Total
Estimate Per
Pond
including
Mob for 1
pond
1 1960 - 1967 5-8 in/day 6.3 274428 50820 43 $1,626,240 $32 $1,826,240 2 1978 - 1981 5-7 in/day 7.2 313632 58080 49 $1,858,560 $32 $2,058,560 3 1960 - 1967 5-7 in/day 3 130680 24200 21 $774,400 $32 $974,400 4 1978 - 1981 2-4 in/day 4.4 191664 35493 30 $1,135,787 $32 $1,335,787 5 1960 - 1967 5-6 in/day 6.2 270072 50013 42 $1,600,427 $32 $1,800,427 6 1978 - 1981 2-4 in/day 6.6 287496 53240 45 $1,703,680 $32 $1,903,680 7 1960 - 1967 2-4 in/day 1.5 65340 12100 11 $387,200 $32 $587,200 8 1978 - 1981 2-4 in/day 2.9 126324 23393 20 $748,587 $32 $948,587 11 1994 - 2002 3-5 in/day 6.2 270072 50013 42 $1,600,427 $32 $1,800,427 12 1994 - 2002 4-5 in/day 5.9 257004 47593 40 $1,522,987 $32 $1,722,987 13 1994 - 2002 3-4 in/day 6.7 291852 54047 46 $1,729,493 $32 $1,929,493 14 1994 - 2002 2-4 in/day 6.3 274428 50820 43 $1,626,240 $32 $1,826,240 15 1994 - 2002 3-5 in/day 5.3 230868 42753 36 $1,368,107 $32 $1,568,107 DKC 1994 - 2002 4-6 in/day 6 261360 48400 41 $1,548,800 $32 $1,748,800 Wash
Pond A 2009-2012 2-3 in/day 1 43560 8067 7 $258,133 $32 $458,133 Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 19 • Reduce the TSS of effluent. The level of TSS within the effluent has impacted the percolation performance of the ponds. Research by Rice (1974) suggests that reducing the TSS to less than about 5 milligram per liter improved the infiltration capability of ponds. TSS and percolation rates should be monitored so that site-specific correlations between TSS and percolation can be assessed and a goal for selecting a threshold for TSS that will allow for average percolation rates to be achieved.
• Transfer remaining water left in ponds at end of percolation period to a settling pond or back to the plant to lower the TSS instead of transferring to an adjacent percolation pond. • Improving percolation of deeper layers may or may not be warranted. Dry wells, air blasting to increase permeability, injection wells or other measures can be evaluated further after shallow rehabilitation methods have been completed and quantified. The number of dry wells would likely need to cover approximately 25 to 50 percent of the bottom of the ponds for there to be improvement to percolation. Drywells also make maintenance more difficult because they need to remain exposed to the effluent water and should not be covered with soil.
6. RECOMMENDATIONS FOR FURTHER STUDY
In planning the expansion of the percolation capacity of the treatment plant, the City is considering construction of additional ponds on City owned land located east of Black Road. Two cross sections have been developed for this
area based on the available
geotechnical data. These
sections are shown on Plates 13
and 14. A plan view of the area
with the preliminary locations of
the proposed ponds is shown on
Figure 11. These areas have
been preliminarily selected
because they are assumed to
have the most favorable
percolation rates. If the city
decides to move forward with
the construction of these
additional ponds, it is
recommended that additional
Figure 11: Proposed Pond Locations – East of Black Road
BLACK ROAD
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 20 exploratory borings and CPTs be performed to confirm the current conditions of the soil and to allow design criteria for the new ponds to be developed.
7. LIMITATIONS
This study has been conducted in general accordance with currently accepted geotechnical practices in this area for use by the client for preliminary design and conceptual planning purposes. The data in this report is based upon the data obtained from subsurface exploration and our understanding of the proposed project. If there are any changes in the project or site conditions, Yeh should review those changes and provide additional recommendations if needed. Any modifications to the recommendations of this report or approval of changes made to the project should not be considered valid unless they are made in writing. The report and drawings contained in this report are intended for preliminary design for input and evaluation of the percolation characteristics of the ponds by others and are not intended to act as a design-level geotechnical report, construction drawings, or specifications.
Site conditions will vary between points of observation or sampling, seasonally, and with time. The nature and extent of subsurface variations across the site may not become evident until excavation is performed. If during construction fill, soil, or water conditions appear to be different from those described herein, Yeh should be advised and provided the opportunity to evaluate those conditions and provide additional recommendations, if necessary. The geotechnical professional should observe portions of the construction and site conditions, such as excavations, exposed subgrades, and earthwork, to evaluate whether the conditions encountered are consistent with those assumed for design, and to provide additional recommendations during construction if needed.
8. REFERENCES
Casagrande, A., and Fadum, R. E. (1940). ‘‘Notes on soil testing for engineering purposes.’’ Publication 268, Graduate School of Engineering, Harvard University, Cambridge, Mass.
City of Santa Maria (City 2024a), Santa Maria WWTP – 2023 Annual Report, WDR 100029526, February 28, 2024.
City of Santa Maria (City 2024b), Perc Ponds Topographic Survey Master v2_, Civil3D.
City of Santa Maria (City 2024c), Operations and Maintenance Manual, WDR 100029526, June 2024.
Dibblee, Thomas W. (Dibblee 1994), Geologic Map of the Santa Maria and Twitchell Dam Quadrangles, California.
Earth Systems Pacific (ESP 2003), Soils Engineering Report – Santa Maria Wastewater Treatment Plant Percolation Pond Expansion East of Stowell and Black Roads, Santa Maria, California, SL-13805-SA dated September 19, 2003.
Geotechnical Data Report Yeh Project No. 223-184
Santa Maria WWTP – Percolation Pond Study March 20, 2025 21 Environmental Data Resources (EDR 2024), The EDR Aerial Photo Decade Package, Inquiry Number:
7536673.1, dated January 9, 2024
Environmental Protection Agency (EPA 2006), Process Design Manual for Land Treatment of Municipal Wastewater Effluents, EPA/625/R-06/016, September 2006 Fugro West, Inc. (Fugro 2006), Geotechnical Report, Santa Maria Wastewater Treatment Plant Upgrades – Phase II, Project No. 3045.053, dated 2006.
Fugro West, Inc. (Fugro 2008a), Geotechnical Report – Santa Maria Wastewater Treatment Plant Percolation Pond No. 1 Rehabilitation, Santa Maria, California, Project No. 3019.008, Dated September 18, 2008.
Fugro West, Inc. (Fugro 2008b), Percolation Pond Lithology and Materials Assessment, dated February 2008.
Fugro Consultants, Inc. (Fugro 2011), Geotechnical Report – Santa Maria Wastewater Treatment Plant Percolation Ponds Nos. 3 and 4 Characterization, Santa Maria, California, dated August 2, 2011.
Rice, R.C., (Rice 1974) “Soil Clogging during Infiltration of Secondary Effluent” Journal of Water Pollution Control Federation, Vol. 46, No. 4.
Tennyson, M.E. (Tennyson 1992), Preliminary Geologic Map of Santa Maria 30’ x 60’ Quadrangle, California.
Vandevivere, P., and Baveye, P. (Vandevivere and Baveye 1992). “Saturated hydraulic conductivity reduction caused by aerobic bacteria in sand columns.” Soil Science Society of America Journal, 56(1), pp. 1–13.
Wallace Group (2011), Technical Memorandum on Percolation Pond Performance and Sustainable Operations, City of Santa Maria WWTP, dated December 9, 2011.
Yeh and Associates, Inc. (Yeh 2024), Geotechnical Memorandum – City of Santa Maria – Wastewater Treatment Plant – Percolation Pond Study, Black Road, Santa Maria, California, dated March 12, 2024.
Yeh and Associates, Inc. (Yeh 2018), Geotechnical Report – Santa Maria Wastewater Treatment Plant, 601 S. Black Road, Santa Maria, California, dated August 10, 2018.
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
1 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 02/28/2025
0 400
feet
North
LEGEND:
Base Map: Google Earth (2022)
1 inch = 400 feet
Subsurface Profile (See plates 8 to 12)
Yeh and Associates, 2018: Sixteen Test Pits to depths of 7 to 12 feet. Encountered clay layer at depths of 3.5 to 9.5 feet.
Fugro, 2008: Three Studies: February 2008: Lithology Study: Hand Augers in Ponds 1, 2, and 7. Two in Pond 1, and one in ponds 2 and 7 to 10.25 Ō. June 2008: Hydrogeologicy Study for WWTP: Study of exisƟng groundwater monitoring of region. Not pond specific September 2008: Rehab Study: 16 test pits in Pond 1 up to 15 feet deep. Clay found from 5 to 7.5 feet below the ground surface.
Monitoring Well (exisƟng)
Agricultural Well (exisƟng)
RehabilitaƟon Dates/Notes 1. Ponds 1 through 3 Rehabilitated in 2001 per Wallace Memo (2011)2. Upper 4 to 5 feet of Pond 1, 2, 3, and 4 screened in 2012.3. Ponds 1, 2, 3, and 5 Rehabilitated in 2011-2013.3. Western half of Pond 12 Rehabilitated in 2018.4. Pond labels per Geosyntec Report (August 5, 2022)5. See Plates 2 to 5 for Historical ExploraƟon LocaƟons and Labels per this study KC Geotechnical Boring (1995) Fugro Boring (1995)
Fugro Boring (2006)Fugro Test Pit (2008)
Yeh Test Pit (2018)Earth Systems Pacific Boring (2003)Fugro Test Pit (2011) Yeh Test Pit locaƟon (current study)Yeh CPT LocaƟon (current study) Notes: LocaƟons of Test pits, CPT, and Borings are approximateSee Plates 2 to 5 for exploraƟon locaƟon labels for the current study Yeh Boring LocaƟon (current study)
RAY ROAD
Pond 1
Pond 2
Pond Expansion Study
ESP, 2003
Prelim Design Plans
Dudek, 2015
Pond 3
Pond 4
Pond 6
Pond 8
Pond 7
Pond 11
Pond 15
Pond 14
Pond 13
Pond 12
Plate 3
Plate 4
Plate 2
Plate 5
Wash Pond A
DKC Pond
Pond 5
BLACK ROAD E’ E
D’
D
C’
C
B’
B
A’
A
Old Label: Pond 7
(prior to spliƫng)
Now DKC and Wash Pond A
DMW-1
DMW-2
UMW-1
KC 1
KC 2
KC 6
KC 5
KC 4
KC3
ESP 5
ESP 6
F1
F2F3F16
F15
F14F13F12F4
F5
F6F7
F8
F9
F10F11
T1T2T3T4
T13
T14T15
T5
T12
T16
T7
T6
F4
F8
F5
F2
F1
F6
F7
F3
F5
F1
F2
F4
F3
T8
T11T10
T9
F3L2 F3-2
F3-4
F3-3
F3-5
F3L1
F3-1
F3-6
F4-1 F4-7
F4-6 F4L1
F4-5
F4-3
F4-2
A A’
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
0 500
feet
North
LEGEND:
Base Map: Google Earth (2022)
Pond 6
Pond 4
Pond 2
2 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 11/14/2024
Earth Systems Pacific Boring (2003)Yeh CPT LocaƟon (current study)Pond Expansion Study (ESP, 2003)Preliminary Design Plans (Dudek, 2015)
BLACK ROAD
STOWELL ROAD
SANTA MARIA WWTP
Subsurface Profiles (See Plates 13 and 14)
24CPT-28
ESP 1
ESP 5
ESP 6 24CPT-26
24CPT-27
24CPT-29 24CPT-30
ESP 7
ESP 4
ESP 3
ESP 2
Note: LocaƟons of test pits, CPT, and Borings are approximate F
F’
G’
G
PLATE PROJECT NAME:
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 5
POND 7
POND 3
POND 8
POND 6
POND 4
POND 1
POND 2
3 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 08/27/2024
0 200
feet
North
LEGEND:
Monitoring Well (exisƟng)
Fugro Boring (1995) KC Geotechnical Boring (1995)Fugro Boring (2006)Fugro Test Pit (2008) Base Map: Google Earth (2022)
Fugro Test Pit (2011) Yeh CPT LocaƟon (current study)
Yeh Test Pit LocaƟon (current study)
Subsurface Profile Yeh Boring LocaƟon (current study)
A A’
F3 F6
F7
F1
F2
F4
F8
F5
F5
F1
F3
F4
F2
KC1
KC2
F1
F2
F3
F16
F12
F13F14F15
F4
F5F6F7F8F9F10F11
DMW-2
DMW-1
UMW-1
F4-2
F4-1
F4-7
F4-6
F4L1
F4-5
F4-3
F3-6
F3-1
F3L1 F3-5
F3-3
F3-4
F3-2
F3L2
24TP6-1 24TP6-6
24TP6-7 24TP4-1
24TP4-3
24TP4-4
24TP4-5
24TP4-7
24TP4-6
24TP4-2
24TP6-8
24TP6-9
24TP6-5
24TP6-4
24TP6-2
24TP6-3
24TP8-224TP8-3
24TP8-1
24TP2-2
24TP2-3
24TP2-8 24TP2-1
24TP2-7
24TP2-4
24TP2-6
24TP2-5
24CPT-12
24CPT-15
24CPT-16
24CPT-17
24CPT-18
24CPT-19
24CPT-20
24CPT-21
24CPT-22
24CPT-23
24CPT-24
24CPT-25
Note: LocaƟons of test pits, CPT, and borings are appproximate 24E6-1
24E6-2
24E6-3
24E6-5 24E6-4
24E4-1
24E4-2
24E4-3
24E4-4
C
E’ E
B’
D
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 5 POND 7
POND 3
DKC POND
POND 1
WASH POND A
4 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 08/27/2024
0 160
feet
North
LEGEND:
Monitoring Well (exisƟng)
KC Geotechnical Boring (1995)
Fugro Test Pit (2008)
Base Map: Google Earth (2022)
Fugro Test Pit (2011)
Yeh CPT LocaƟon (current study)
A A’
Subsurface Profile
Note: LocaƟons of test pits, CPT, and borings are approximate KC2
F1
F2
F3
F16
F12
F13F14F15
F4
F5F6F7F8F9F10
F11
KC1
KC4
KC5
KC6
DMW-1
KC3
F3L2
F3-2
F3-4
F3-3
F3-5
F3L1
F3-1
F3-6
24CPT-16
24CPT-15
24CPT-12
B’
D’
C’
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
SUBSURFACE EXPLORATION MAP
Geotechnical • Geological • Construction Services
POND 15
POND 13
POND 12
POND 11
POND 14
5 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
0 160
feet
North
LEGEND:
Monitoring Well (exisƟng)KC Geotechnical Boring (1995)
Yeh Test Pit (2018)
Base Map: Google Earth (2022)
RAY ROAD
Yeh Test Pit LocaƟon (current study)Yeh CPT LocaƟon (current study)Yeh Boring LocaƟon (current study) A A’
Subsurface Profile
24E14-01
KC4
KC3
DMW-1
T1
T2
T3
T4
T13T14
T15
T5
T12
T16T7
T6
T11T10
T9
T8
24CPT-12
24CPT-01
24CPT-02
24CPT-03
24CPT-04
24CPT-05 24CPT-06 24CPT-07
24CPT-08
24CPT-09
24CPT-10
24CPT-13
24CPT-11
24CPT-14
Note: LocaƟons of test pits, CPT, and borings are approximate 24TP14-12
24TP11-3
24TP11-5
24TP11-5
24TP11-2
24TP11-1
24TP14-04
24TP14-14
24TP14-02
24TP14-08
24TP14-05 24TP14-09 24TP14-13
24TP14-07
24TP14-10
24TP14-03
24TP14-01
24TP14-06
24TP14-11
24E14-02
24E14-03
24E14-04
B
A’
A
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
PLANT TIMELINE
Geotechnical • Geological • Construction Services
6 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 02/28/2025
First set of 10 ponds
constructed for
plant expansion
ESP Report
(Pond expansion)
Fugro Report
(Pond 1 Rehab)
Fugro Report
(Pond 3/4 Expansion)
Yeh Report
(Pond 12)
Fugro Report
(Plant Expansion)
Plant Expansion
to 8 MGD
(Pond 7) added
PercolaƟon Pond
Study IniƟated
5 new ponds
constructed for
effluent disposal
1961-1967
Treatment plant first constructed.Spray fields used for effluent disposal 1938-1949
1996
2001-2006 2011
2008
2006
2003
2018
El nino
1983
El nino
1995
El nino
1998
Rehab of Western
half of Pond 12
2012 2018
Wet Winter
2017
Geotechnical
Studies
(Fugro)
1995
DWR Report
(Plant)
1961
Drought
2012-2016
Wet Winter
2023
June
2023
Rehab of Ponds 1, 2, 3
using Sand/Clay separator
2001
Rehab of
Ponds
1, 2, and 3
Plant
Expansion
2007-2009
1981
Pond consolidaƟon and
addiƟon of 4 ponds.
Ponds 1 to 8. 16 ponds
constructed in west
porƟon of site
2002
8 of 16 ponds
constructed in
west porƟon of
site repurposed for
compost facility
2019
Rehab: 4 30-inch
diameter holes
drilled in north
area of Pond 6 and
backfilled with sand
Two ponds removed
to expand compost
facility. 15 ponds
total remain
2016
Note: Plant and pond construcƟon dates are esƟmated from historical aerial photos PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
POND PERFORMANCE
Geotechnical • Geological • Construction Services
7 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
0 400
feet
North
LEGEND:
Base Map: Google Earth (2022)
1 inch = 400 feet
Poor performance, pond is only reliable for wet weather storage and generally does not percolate wellMediocre performance, pond does percolate, but takes a whileMedium performance, pond can take more water than others and is generally reliable Decent performance, pond percolates and is more reliable than other less performing ponds InformaƟon from: Pond Performance ClassificaƟons are based on a quesƟonarre provided to plant staff. Russ Newman, City of Santa Maria WWTP Plant Manager, November 2023
BLACK ROAD
RAY ROAD
Pond 13
Pond 11
Pond 14 Pond 12
Pond 15
Pond 8
Pond 6
Pond 4
Pond 2
Pond 1
Wash Pond A
DKC Pond
Pond 5
Pond 7 Pond 3
5-7 in/day
5-8 in/day
5-7 in/day
2-4 in/day
2-4 in/day 2-4 in/day5-6 in/day
2-4 in/day
4-6 in/day
2-3 in/day
3-5 in/day
2-4 in/day 4-5 in/day
3-4 in/day
3-5 in/day
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
8 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE A-A’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Qa
Ground Surface
Qa Qa
Qa
Qa
Pond 13 Pond 14 Pond 15
?
?
?
?
Af
IntersecƟon with
B-B’
?
?
?
?
? ? ? ? ? ? ?
?
?
?
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 100 Ō. horizontal
170150
130
110
0 200 400 600 800 1000
170150130
110
9070
ELEVATION (FEET)
ELEVATION (FEET)
A
South
A’
North
90 70
1200 1400
OFFSET (FEET)
Af
24TP14-08
Rt. 0’
TD = 10’
SC
SP-SC
SW-SM
SW
24TP14-07
Lt. 12’
TD = 10’
SP
CL-ML
SW
24TP14-06
Lt. 32’
TD = 10’
SC
SW
CL
SP
24CPT-13 148'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.7'
100 200 300 400 500
30' LT.
24CPT-08 148.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.9'
100 200 300 400
15' RT.
24CPT-04 148.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 88.0'
100 200 300 400
15' RT.
Af
24CPT-01 150.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 114.2'
100 200 300
30' LT.
24E14-01
Rt. 0’
TD = 34.5’
SP
CLSC
SM
CL
SC
TD = 10’
SP
CH
SP
24TP14-05
Lt. 48’
Af
24E14-02
Rt. 80’
TD = 31.5’
SP
SC
CL
24E14-03
Lt. 434’
TD = 31.5’
SC-SM
CLCLSPCLSP
SPSP
SP-SC
SP-SC
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
9 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE B-B’
LEGEND:
Af ArƟficial Fill:
SAND and silty SAND
Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvium:SAND with disconƟnuous interbedded layers of silt and clay
HOLE I.D. LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Perched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Ground Surface
?
?? ? ?
Qa
Af
Af
Af Af Af
Af
?
? ? ? ?
?
?
?
?
?
?
?
?
?
?
?
?
?
?
Qa
Qa
Qa Qa
1 in. = 25 Ō. verƟcal
PROFILE
1 in. = 250 Ō. horizontal
Pond 14 Pond 12 Pond 5 Pond 3 Pond 1
IntersecƟon with
A-A’
IntersecƟon with
D-D’ IntersecƟon with C-C’
200175
150
125
0 500 1000 1500 2000 2500
20017515012510075
ELEVATION (FEET)
ELEVATION (FEET)
B
West
B’
East
100
75 3000 3500
OFFSET (FEET)
Fugro 2011
TP-3L2
Rt. 5.5’
TD = 14’
SP-SM
Fugro 2008
T-11
Lt. 20’
TD = 6’
ML
CH
SP-SM
Fugro 2011
TP-3-2
Rt. 72’
TD = 14’
SP
CL
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
24CPT-02 148'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 102.9'
100 200 300 400
115' LT.
24CPT-04
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 88.0'
100 200 300 400
148'
20' LT.
24CPT-06 150'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 119.8'
100 200 300 400
35' RT.
24CPT-09 148.5'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-19-24
Terminated at Elev 103.2'
100 200 300 400
135' RT.
24CPT-12 151'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 109.7'
100 200 300 400
75' RT.
24CPT-15 155'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 94.8'
100 200 300 400
35' RT.
6 24CPT-16 156.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 100.2'
100 200 300 400
90' RT.
6 24E14-01
Lt. 80’
TD = 34.5’
SP
CL
SC
CL
SM
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
10 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE C-C’
LEGEND:
Af
ArƟficial Fill: Medium dense Clayey SAND (SM) with GRAVEL Geologic contact, queried where uncertain
? See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Perched Water or seepage encounteredduring drilling/exploraƟon ALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Af
Ground Surface
Qa
?
?
?
?
?
? ?
?
? ?
? ?
?
?
?
?
?
?
?
Qa
Qa
Qa
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
IntersecƟon with
B-B’
IntersecƟon with
E-E’ 180
160
140
120
0 400 800 1200 1600 2000
18016014012010070
ELEVATION (FEET)
ELEVATION (FEET)
C
South
C’
North
100
80 2400
OFFSET (FEET)
60 80
2500
24CPT-07 151.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 115.9'
100 200 300
35' LT.
24CPT-12 151.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 109.7'
100 200 300 400
30' RT.
24CPT-17 156.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 110.9'
100 200 300 400 500
30' RT.
24CPT-20 157.5'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 127.3'
100 200 300 400 500
30' RT.
24CPT-23 157.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 92.2'
100 200 300 400 500
0' RT.
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
11 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE D-D’
BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACEFIELD N-VALUE IN BLOWS PER FOOTLITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLORED2” OD SPT SAMPLER
BORING DIAGRAM
2.5” OD MODIFED CALIFORNIA SAMPLER
24X-01
RT. 20’
TD = 30.5’
24 61
GCCLMH
MHMHMHMHMH
72 50/6
82 SHELBY TUBE SAMPLER
LEGEND:
Af
ArƟficial Fill: Medium dense Clayey SAND (SM) with GRAVEL Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay Perched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Af
Qa
Ground Surface
Qa
Qa
IntersecƟon with
E-E’
IntersecƟon with
B-B’
?
?
?
?
?
?
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
170150
130
110
0 400 800 1200 1600 2000
1701501301109070
ELEVATION (FEET)
ELEVATION (FEET)
D
South
D’
North
90 70
2400
OFFSET (FEET)
155.0'
0' RT.
24CPT-18
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124'
100 200 300 400
24CPT-15 155.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 94.8'
100 200 300 400
0' RT.
24CPT-24 154.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 114.0'
100 200 300 400
20' LT.
24E6-03
Lt. 80’
TD = 31.5’
SW
CL
SW
24CPT-21 155.0'
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124.8'
100 200 300 400
0' RT.
? ?
?
?
?
? ?
?
?
? ?
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
12 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 10/03/2024
SUBSURFACE PROFILE E-E’
LEGEND:
Af
ArƟficial Fill: SAND and silty SAND`
Geologic contact, queried where uncertain
?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvium:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE Perched Water or seepage encountered
during drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy) Ground Surface
Qa?
?
?
?
Af Af
Af
Af
1 in. = 10 Ō. verƟcal
PROFILE
1 in. = 125 Ō. horizontal
Pond 8 Pond 6 Pond 4 Pond 2
IntersecƟon with
C-C’ 170
160
150
140
0 250 500 750 1000 1250
170160150140130120
ELEVATION (FEET)
ELEVATION (FEET)
E
West
E’
East
130
120
1500 1750
OFFSET (FEET)
110 110
105 105
IntersecƟon with
D-D’
24TP2-02
TD = 12’
SP-SM
SP
SW
24CPT-20 157.5'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 127.3'
100 200 300 400 500
24CPT-22 156.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-21-24
Terminated at Elev 125.8'
100 200 300 400
24TP2-07
TD = 10’
SP
24TP2-06
TD = 10’
SPSP
SW
Fugro 2011
TP 4-6
TD = 13’
SM
ML
CL
SP-SM
24E6-01
Rt. 40’
TD = 31.5’
SP-SC
SP
ML/CL
SP
SP-SM
24E6-03
Rt. 80’
TD = 31.5’
SW
CL
SW
24TP6-02
TD = 4.5’
SP-SM
CL-ML
SP
24TP6-05
TD = 10’
SP
CL-ML
SW
24TP6-08
TD = 11’
SP-SMSP-SM
CL-ML
24CPT-21 155.0'
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-20-24
Terminated at Elev 124.9'
100 200 300 400
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
13 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 03/21/2025
SUBSURFACE PROFILE F-F’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Ground Surface
1 in. = 20 Ō. verƟcal
PROFILE
1 in. = 200 Ō. horizontal
IntersecƟon with
G-G’
180160
140
120
0 400 800 1200 1600 2000
180160140
120
10080
ELEVATION (FEET)
ELEVATION (FEET)
F
West
F’
East
100
90 2400 2800
OFFSET (FEET)
Black Rd
161.0'
24CPT-27
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-21-24
Terminated at Elev 133.8'
100 200 300
RT 0'
174.0'
24CPT-28
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 143.7'
100 200 300
RT 20' ESP-5 Lt. 60’
TD = 51.5’
SP
ML
SP
ML
SP
ML
Water Disposal Area
(Off Site Source)
171.0'
24CPT-26
4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 140.8'
100 200 300
ESP-6 LT 735'
Lt. 710’
TD = 51.5’
SP
ESP-1
Lt. 625’
TD = 51.5’
SCSP
SW
SP
ML
SP-SM
Proposed Future Ponds
PROJECT NAME: PLATE
PROJECT NUMBER: REVISION DATE:
Geotechnical • Geological • Construction Services
14 City of Santa Maria WWTP - PercolaƟon Ponds
Black Road
Santa Maria, CA
223-184 03/21/2025
SUBSURFACE PROFILE G-G’
TEST PIT/BORING NUMBEROFFSET FROM SECTION LINEEXISTING GROUND SURFACELITHOLOGIC CONTACTUSCS SOIL CLASSIFICATIONTOTAL DEPTH EXPLOREDGRAB SAMPLE
TEST PIT DIAGRAM
24X-01
RT. 20’
TD = 30.5’
61 MH
82 PUSH SAMPLE
LEGEND:
Af ArƟficial Fill:
SAND and silty SANDPerched Water or seepage encounteredduring drilling/exploraƟonALLUVIUM predominantly clay and silt layers(all other layers are predominantly sandy)Geologic contact, queried where uncertain ?
See text and logs of exploraƟon for
descripƟon of subsurface condiƟons.
All boundaries and locaƟons are
approximate.
Qa
Valley Floodplain Alluvim:SAND with disconƟnuous interbeddedlayers of silt and clay HOLE I.D.
LOCATION
TOP HOLE ELEV.
FRICTION RATIO (%)
63 024 2010 0
TERMINATED AT ELEV.
TIP RESISTANCE (Tsf)
CONE PENETRATION TEST (CPT)
DIAGRAM
Ground Surface
IntersecƟon with
F-F’
1 in. = 25 Ō. verƟcal
PROFILE
1 in. = 250 Ō. horizontal
Proposed Future Ponds
175150
125
100
0 500 1000 1500 2000 2500
175150125
100
7550
ELEVATION (FEET)
ELEVATION (FEET)
G
South
G’
North
75 50
3000 3500
OFFSET (FEET)
164.0' LT 1030'
24CPT-29
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 134.0'
100 200 300 400
171.0'
24CPT-26
6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 140.8'
100 200 300
171.0'
24CPT-30
8 6 4 2 0
Friction Ratio (%) Tip Bearing (tsf)
03-18-24
Terminated at Elev 109.0'
100 200 300 400
RT 1050'
ESP-4
Lt. 60’
TD = 51.5’
MLML
SP
ML
SP
SP
ESP-5
Lt. 95’
TD = 51.5’
SP
ML
SP
ML
SP
ML
ESP-7
Lt. 50’
TD = 60’
SP
ML
SP
SC
SP
SW
SP
SW
SP
ML
SP
APPENDIX A - BORING LOGS, TEST PIT LOGS, AND CPT PLOTS
DATE
7/16/2024
PROJECT NAME
Santa Maria WWTP
SILTY, CLAYEY SAND
Group Names
SC-SM
Graphic / Symbol Graphic / Symbol Group Names
Standard California Sampler (2.5" O.D.)
C
GRAVELLY ORGANIC SILT GRAVELLY ORGANIC SILT with SAND
ORGANIC SILT
SANDY ORGANIC fat CLAY
Elastic SILT with SAND
Well-graded GRAVEL Compaction Curve (ASTM D1557)
Corrosion, Sulfates, Chlorides (CTM 643; ASTM D4972,
ASTM G187, ASTM D4327)
-200 200 Wash (ASTM D1140)
VS Vane Shear (AASHTO T 223-96 [2004])
UW Unit Weight (ASTM D4767, ASTM D7263)
UU Unconsolidated Undrained Triaxial
(ASTM D2850)
UC Unconfined Compression - Soil (ASTM D2166)
Unconfined Compression - Rock (ASTM D7012)
TV
Poorly graded GRAVEL with SILT
GRAVELLY lean CLAY with SAND
SP-SC
SW
SP
Piston Sampler
SW-SM
SILTY, CLAYEY GRAVEL with SAND
CLAYEY GRAVEL with SAND
SILTY GRAVEL with SAND
Modified California Sampler (3" O.D.)
GRAVELLY SILT with SAND
SILT
ORGANIC SILT with SAND ORGANIC SILT with GRAVEL
Consolidation (ASTM D2435)
Standard Penetration Test (SPT) (2" O.D.)
OL
SC
GW
Well-graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
CR
Pocket Torvane
SW Swell Potential (ASTM D4546)
SILTY, CLAYEY SAND with GRAVEL
CLAYEY SAND with GRAVEL
SILTY SAND with GRAVEL
GROUP SYMBOLS AND NAMES
DRILLING METHOD SYMBOLS
OL
GC
GP
GC-GM
SANDY ORGANIC SILT
Lean CLAY with SAND
Lean CLAY with GRAVEL
SANDY lean CLAY with GRAVEL
ORGANIC lean CLAY
GRAVELLY ORGANIC lean CLAY GRAVELLY ORGANIC lean CLAY with SAND Fat CLAY
Elastic SILT with GRAVEL SANDY elastic SILT SANDY elastic SILT with GRAVEL GRAVELLY elastic SILT GRAVELLY elastic SILT with SAND ORGANIC elastic SILT
SANDY ORGANIC SILT with GRAVEL
CH
SE
MH
OH
OL/OH
Rock Core Grab Sample
Poorly graded SAND with SILT and GRAVEL
SANDY lean CLAY
GRAVELLY lean CLAY
ORGANIC lean CLAY with SAND ORGANIC lean CLAY with GRAVEL SANDY ORGANIC lean CLAY SANDY ORGANIC lean CLAY with GRAVEL
Fat CLAY with SAND
Fat CLAY with GRAVEL SANDY fat CLAY
Sand Equivalent (CTM 217)
SANDY fat CLAY with GRAVEL GRAVELLY fat CLAY GRAVELLY fat CLAY with SAND ORGANIC fat CLAY ORGANIC fat CLAY with SAND ORGANIC fat CLAY with GRAVEL GW-GM
CL
CL-ML
ML
COBBLES and BOULDERS
BOULDERS
PT
SILTY GRAVEL
CLAYEY GRAVEL
SILTY, CLAYEY GRAVEL
SILTY SAND
CLAYEY SAND
SILTY CLAY
SILTY CLAY with SAND
SILTY CLAY with GRAVEL SANDY SILTY CLAY
SANDY SILTY CLAY with GRAVEL GRAVELLY SILTY CLAY GRAVELLY SILTY CLAY with SAND SILT with SAND
SILT with GRAVEL SANDY SILT SANDY SILT with GRAVEL
SANDY ORGANIC fat CLAY with GRAVEL GRAVELLY ORGANIC fat CLAY GRAVELLY ORGANIC fat CLAY with SAND Elastic SILT
ORGANIC elastic SILT with GRAVEL SANDY elastic ELASTIC SILT
COBBLES
Well-graded GRAVEL with SAND
Well-graded GRAVEL with SILT
Well-graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Well-graded SAND with CLAY (or SILTY CLAY)
Poorly graded GRAVEL
Poorly graded GRAVEL with CLAY
(or SILTY CLAY)
Poorly graded SAND with SILT
Poorly graded SAND with CLAY (or SILTY CLAY)
Poorly graded SAND with CLAY and GRAVEL
(or SILTY CLAY and GRAVEL)
Lean CLAY
ORGANIC elastic SILT with SAND
SANDY ORGANIC elastic SILT with GRAVEL GRAVELLY ORGANIC elastic SILT GRAVELLY ORGANIC elastic SILT with SAND GW-GC
GP-GM
GP-GC
GM
Well-graded SAND with SILT
SW-SC
SP-SM
GRAVELLY SILT
ORGANIC SOIL ORGANIC SOIL with SAND ORGANIC SOIL with GRAVEL SANDY ORGANIC SOIL SANDY ORGANIC SOIL with GRAVEL GRAVELLY ORGANIC SOIL GRAVELLY ORGANIC SOIL with SAND OH
SM
Auger Drilling
FIELD AND LABORATORY TESTS
WATER LEVEL SYMBOLS
Dynamic Cone
or Hand Driven Rotary Drilling Diamond Core
Static Water Level Reading (long-term)
Bulk Sample Other (see remarks)
Static Water Level Reading (short-term)
First Water Level Reading (during drilling)
SHEET
1 of 1
SAMPLER GRAPHIC SYMBOLS
PEAT
Well-graded GRAVEL with SILT and SAND
Well-graded GRAVEL with CLAY (or SILTY CLAY)
Well-graded SAND
Well-graded SAND with GRAVEL
Well-graded SAND with SILT and GRAVEL
Poorly graded GRAVEL with SAND
Poorly graded GRAVEL with SILT and SAND
Poorly graded GRAVEL with CLAY and SAND
(or SILTY CLAY and SAND)
Poorly graded SAND
Poorly graded SAND with GRAVEL
RS Torsional Ring Shear (ASTM D6467)
R R-Value (CTM 301)
REPORT TITLE
LEGEND FOR SOIL CLASSIFICATION
Thin-Walled Tube
CP
PP Pocket Penetrometer
PL Point Load Index (ASTM D5731)
Liquid Limit, Plastic Limit, Plasticity Index
(ASTM D4318)
PI
PA Particle Size Analysis (ASTM D422-63 [2007])
P Permeability (ASTM 5084)
M Moisture Content (ASTM D2216)
EI Expansion Index (ASTM D4829)
DS Direct Shear (ASTM D3080)
CU Consolidated Undrained Triaxial (ASTM D4767)
A1 of 103
-200 (0% G, 73% S, 27% F)
P
19 87 0.8PP
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; (ALLUVIUM).
Poorly graded SAND (SP); loose; black; moist.
Medium dense.
Medium to coarse GRAVEL.
Few subrounded GRAVEL.
CLAYEY SAND (SC); medium dense; brown; wet.
Lean CLAY (CL); medium stiff; brown; moist.
SILT (ML); medium stiff; brown; moist.
R1
R2
55 R3
56 R4
57 R5
58 60
50 32
89 23
89 23
83 80
94 2
5 5
5 8
11 9
18 20
7 8
10 BORING NUMBER
24E4-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, clear
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
NW Corner of Pond 4
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 19
38 18
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A2 of 103
PA (0% G, 93% S, 7% F)
-200 (0% G, 95% S, 5% F)
P
11 101
Poorly graded SAND with SILT (SP-SM); medium
dense; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
59 61
30 89
83 11
18 22
9 17
23 ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 40 40
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A3 of 103
PA (1% G, 94% S, 5% F)
Poorly graded SAND with GRAVEL (SP); loose; brown;
moist; (ALLUVIUM).
Poorly graded SAND with SILT (SP-SM); loose; olive
brown; moist; medium to coarse SAND.
Medium dense; fine to medium SAND; 2" layer of SILT
(ML).
4" layer of SILT (ML).
Fine to medium SAND.
Medium to coarse SAND.
R1
R2
62 R3
63 R4
64 R5
65 33
35 89
33 100
40 100
37 89
3 7
7 3
6 7
4 6
7 5
9 13
BORING NUMBER
24E4-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
27.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Overcast
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Center of east edge of Pond 4
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 14 13
13 22
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A4 of 103
Loose; wet; 6" layer of silty CLAY (CL-ML).
Poorly graded SAND with SILT (SP-SM) (continued). Medium dense.
Medium to coarse SAND.
Fine to medium SAND.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
66 67
40 83
100
6 6
2 10
15 13
ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 8 28
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A5 of 103
PA (1% G, 95% S, 4% F)
1.0PP
Poorly graded SAND (SP); loose; light brown to brown;
moist; medium to coarse SAND; (ALLUVIUM).
SILTY CLAY (CL-ML); medium stiff; brown and gray;
moist.
Poorly graded SAND (SP); loose; brown to gray; moist;
fine ro coarse SAND.
Medium dense; fine to medium SAND.
Medium to coarse SAND.
R1
R2
68 70
R3
69 R4
71 R5
72 28
43 100
23 100
33 94
33 100
1 2
2 3
5 5
3 7
8 6
9 12
BORING NUMBER
24E4-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
30.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Cloudy
SURFACE ELEVATION
146.0 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Midle of south edge of Pond 4
ELEVATION (ft)
144
142
140
138
136
134
132
130
128
126
124
122
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 10
15 21
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A6 of 103
1.0PP
Poorly graded SAND (SP) (continued).
1/8" seam of lean CLAY (CL).
SANDY lean CLAY (CL); medium stiff; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
73 74
25 78
39 3
10 10
5 5
3 ELEVATION (ft)
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 20 8
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A7 of 103
0.25 - 1.0PP
Poorly graded SAND (SP); loose; brown; moist; trace
subangular to subrounded GRAVEL; medium to coarse
SAND; (ALLUVIUM).
SILTY CLAY (CL-ML); soft; gray to brown; moist.
2" layer of well-graded SAND (SW).
Poorly graded SAND (SP); medium dense; light brown;
moist; fine to medium SAND.
Light brown to gray; medium to coarse SAND.
R1
R2
75 76
R3
77 R4
78 R5
79 20
100
30 78
23 100
27 84
1 2
2 6
12 17
11 13
15 5
11 13
BORING NUMBER
24E4-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
22.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, warm
SURFACE ELEVATION
144.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of east edge of Pond 4
ELEVATION (ft)
142
140
138
136
134
132
130
128
126
124
122
120
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 29
28 24
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A8 of 103
Dense; wet; trace subangular ro subrouned GRAVEL.
Poorly graded SAND (SP) (continued).
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
80 81
30 100
100
12 25
28 10
14 18
ELEVATION (ft)
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E4-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 53 32
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A9 of 103
PA (0% G, 93% S, 6% F)
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; fine to medium SAND; (ALLUVIUM).
Poorly graded SAND (SP); loose; gray; wet; medium to
coarse SAND.
3" layer of lean CLAY (CL).
Medium dense; light brown; moist.
6" layer of Silty SAND (ML).
Gray; fine to medium SAND.
Brown.
Poorly graded SAND with SILT (SP-SM); dense; brown;
moist.
R1
R2
30 R3
31 R4
32 R5
33 13
27 72
30 94
33 100
40 100
3 2
2 2
8 11
4 6
10 12
22 28
BORING NUMBER
24E6-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
20.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, cool
SURFACE ELEVATION
145.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of west edge of Pond 6
ELEVATION (ft)
143
141
139
137
135
133
131
129
127
125
123
121
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 4 19
16 50
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A10 of 103
Very loose.
Poorly graded SAND with SILT (SP-SM) (continued). CLAYEY SILT (ML/CL).
Well-graded SAND (SW); medium dense; brown;
moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
34 35
30 100
100
7 2
3 16
20 19
ELEVATION (ft)
119
117
115
113
111
109
107
105
103
101
99 97
95 93
91 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 5 39
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A11 of 103
Poorly graded SAND (SP); medium dense; light brown;
moist; fine to medium SAND; (ALLUVIUM).
2" lean CLAY (CL).
1" layer of clayey SILT (ML/CL).
Loose.
Trace GRAVEL from 12 to 14 feet.
Medium dense.
R1
R2
36 R3
37 R4
38 R5
39 28
25 89
27 89
27 100
27 100
3 8
11 3
5 5
7 10
11 10
18 22
BORING NUMBER
24E6-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
29.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny, clear
SURFACE ELEVATION
146.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Southwest corner of Pond 6
ELEVATION (ft)
144
142
140
138
136
134
132
130
128
126
124
122
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 19 10
21 40
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A12 of 103
PA (18% G, 76% S, 6% F)
-200 (0% G, 45% S, 55% F)
P
<
0.25PP
13 103
Poorly graded SAND with CLAY and GRAVEL
(SP-SC); dense; light brown; moist; trace fine to
coarse, subrounded GRAVEL; fine to coarse SAND.
1" of lean CLAY.
Some subrounded to subangular GRAVEL.
SANDY lean CLAY (CL); very soft; brown; wet.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
40 41
25 100
100
11 24
23 3
4 3 ELEVATION (ft)
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 47 7
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A13 of 103
<0.5PP
Well-graded SAND (SW); loose; brown; moist; fine to
coarse SAND; (ALLUVIUM).
Lean CLAY (CL); very soft; brown; moist.
Poorly graded SAND (SP); medium dense; light brown
to gray brown; moist; fine ro coarse SAND.
1" layer of lean CLAY (CL).
With intermittent seams of lean CLAY (CL) to 1/4"
thick.
R1
R2
42 44
R3
43 R4
45 R5
--
27 70
100
100
30 100
33 89
33 0
1 1
1 6
11 14
9 14
20 7
11 14
BORING NUMBER
24E6-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, breezy
SURFACE ELEVATION
144.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Middle of east edge of Pond 6
ELEVATION (ft)
142
140
138
136
134
132
130
128
126
124
122
120
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 2 25
34 25
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A14 of 103
-200 (0% G, 59% S, 40% F)
P
19 100
3" layer of lean CLAY (CL).
Poorly graded SAND (SP) (continued).
SILTY SAND (SM); medium dense; light brown to gray
brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
46 47
47 83
83 10
14 23
9 13
20 ELEVATION (ft)
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 37 43
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A15 of 103
PA (0% G, 94% S, 6% F)
1.0PP
0.5PP
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; (ALLUVIUM).
Black to gray.
Lean CLAY (CL); medium stiff; brown; moist.
Poorly graded SAND (SP); loose; black; moist.
SILT (ML); soft; gray to brown; moist.
Poorly graded SAND (SP); loose; gray; moist; medium
to coarse SAND.
Medium dense; fine to medium SAND.
Medium to coarse SAND.
Poorly graded SAND with SILT (SP-SM); light brown.
R1
R2
48 50
R3
49 R4
51 R5
52 55
42 100
38 100
33 100
30 100
1 5
5 3
9 12
7 11
16 10
16 18
BORING NUMBER
24E6-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-25-24
COMPLETION DATE
6-25-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, warm
SURFACE ELEVATION
142.5 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Northeast area of Pond 6
ELEVATION (ft)
141
139
137
135
133
131
129
127
125
123
121
119
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 21
27 34
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A16 of 103
Poorly graded SAND with SILT (SP-SM) (continued).
1" layer of SILT.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
53 54
35 89
78 9
14 21
5 7
10 ELEVATION (ft)
117
115
113
111
109
107
105
103
101
99 97
95 93
91 89
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 35 17
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A17 of 103
0.5PP
Poorly graded SAND (SP); loose; light brown; moist;
fine to medium SAND; (ALLUVIUM).
Gray brown; medium to coarse SAND.
SILTY CLAY (CL-ML); soft; brown/gray; moist.
Poorly graded SAND (SP); loose; gray brown; moist;
fine to coarse SAND.
Light brown.
Medium dense.
82 83
84 85
86 87
88 89
90 91
92 93
94 95
--
96 100
100
100
100
83 100
89 100
89 89
100
100
100
89 11
100
2 5
7 4
5 4
3 6
7 2
1 2
2 2
5 3
5 7
7 8
13 4
5 5
5 6
8 2
4 7
10 17
20 7
8 11
8 14
19 7
8 12
5 6
8 8
12 15
BORING NUMBER
24E6-05
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
24.0 ft
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-26-24
COMPLETION DATE
6-26-24
GROUNDWATER
READINGS
WEATHER NOTES
Sunny, breezy
SURFACE ELEVATION
142.5 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.0 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Northwest corner of Pond 6
ELEVATION (ft)
141
139
137
135
133
131
129
127
125
123
121
119
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-05
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 12 9
13 3
7 12
21 10
14 11
37 19
33 20
14 27
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A18 of 103
1" layer of gray SILT (ML).
Poorly graded SAND (SP) (continued).
4" layer of gray SILT (ML).
Bottom of borehole at 31.0 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
97 98
99 83
83 5
12 18
10 10
8 1
2 2 ELEVATION (ft)
117
115
113
111
109
107
105
103
101
99 97
95 93
91 89
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E6-05
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 30 18
4 25
26 27
28 29
30 31
32 33
34 35
36 37
38 39
40 41
42 43
44 45
46 47
48 49
50 51
52 53
54 55
A19 of 103
Rig chatter, material stuck in auger,
sampler twisted
PA (2% G, 81% S, 17% F)
Poorly graded SAND (SP); light brown; moist; trace
subangular GRAVEL; medium to coarse SAND;
(ALLUVIUM).
Medium dense.
Yellowish brown.
Some fine to coarse, subangular to subrounded
GRAVEL.
Some seepage.
CLAYEY SAND (SC); medium dense; light brown;
moist.
No GRAVEL.
R1
R2
1 R3
2 R4
3 R5
4 50
33 100
27 106
27 100
30 100
5 8
11 11
13 11
6 9
14 8
9 15
BORING NUMBER
24E14-01
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Partly cloudy, warm
SURFACE ELEVATION
133.5 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
34.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
North side center of Pond 14
ELEVATION (ft)
132
130
128
126
124
122
120
118
116
114
112
110
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 19 24
23 24
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A20 of 103
-200 (0% G, 39% S, 61% F)
P
24 98 0.5PP
CLAYEY SAND (SC) (continued). Lean CLAY (CL); medium stiff; brown; moist.
CLAYEY SAND (SC); loose; brown; moist.
SANDY lean CLAY (CL); soft; brown; moist.
SILTY SAND (SM); loose; brown; moist.
Bottom of borehole at 34.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
5 R7
6 7
8 9
23 89
63 100
4 6
4 4
4 8 ELEVATION (ft)
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-01
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 12
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A21 of 103
Poorly graded SAND (SP); loose; brown; moist; trace
GRAVEL; (ALLUVIUM).
2" layer of lean CLAY with SAND (CL).
Loose.
4" layer of lean CLAY with SAND (CL).
Medium dense.
Intermittent seams of well-graded SAND with CLAY
(SW-SC).
R1
R2
10 R3
11 R4
12 R5
13 53
37 100
30 100
27 100
30 100
2 3
8 6
13 18
7 8
14 5
9 10
BORING NUMBER
24E14-02
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
134.0 ft
LOGGED BY
L. Salemme
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
South side center of Pond 14
ELEVATION (ft)
132
130
128
126
124
122
120
118
116
114
112
110
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 11 31
22 19
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A22 of 103
-200 (0% G, 97% S, 3% F)
P
Dense. 7 101
Poorly graded SAND (SP) (continued).
CLAYEY SAND (SC); medium dense; light brown to
gray; moist.
Lean CLAY (CL); medium stiff; light brown to gray;
moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
14 15
27 100
100
9 22
23 3
8 12
ELEVATION (ft)
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-02
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 46 20
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A23 of 103
PA (0% G, 94% S, 6% F)
2PP
SILTY, CLAYEY SAND (SC-SM); loose; brown; moist;
(ALLUVIUM).
Poorly graded SAND (SP); loose; brown; moist; fine to
medium GRAVEL.
Lean CLAY (CL); stiff; brown; moist.
Poorly graded SAND (SP); loose; black; moist.
Lean CLAY (CL); medium stiff; brown; moist.
Poorly graded SAND (SP); loose; brown; moist.
Poorly graded SAND with SILTY CLAY (SP-SC); loose;
brown; moist.
Poorly graded SAND with CLAY (SP-SC); loose; brown;
moist; medium to coarse SAND.
R1
R2
16 R3
17A
17B
R4
18 20
R5
19 18
20 100
23 100
32 100
30 100
6 9
9 6
12 16
3 4
7 10
12 20
BORING NUMBER
24E14-03
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
136.0 ft
LOGGED BY
L. Salemme/ B. Gabrik
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
Southwest corner of Pond 14
ELEVATION (ft)
134
132
130
128
126
124
122
120
118
116
114
112
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 18 28
11 32
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A24 of 103
Poorly graded SAND with CLAY (SP-SC) (continued).
3" layer of lean CLAY (CL).
Lean CLAY (CL).
Poorly graded SAND (SP); loose; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
21 22
25 100
100
7 14
18 3
6 16
ELEVATION (ft)
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-03
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 32 22
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A25 of 103
PA (0% G, 95% S, 5% F)
1.5PP
Poorly graded SAND with CLAY (SP-SC); medium
dense; brown; moist; (ALLUVIUM).
Black/gray.
Medium dense; black/gray; moist; trace fine to medium,
subangular to subrounded GRAVEL.
Gray.
Lean CLAY (CL); stiff; brown; moist; few seams of
SILT.
R1
R2
23 R3
24 R4
25 R5
26 28
43 32
100
30 100
30 100
75 100
6 13
13 4
8 10
5 11
15 10
16 22
BORING NUMBER
24E14-04
BOREHOLE LOCATION (Offset, Station, Line)
DURING DRILLING
Not Encountered
AFTER DRILLING (DATE)
FINAL BY
R. Hooke
DRILL RIG
CME 550
Native
DRILLING METHOD
8 inch Hollow Stem Auger with continuous CME Sampler
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
--/--
BEGIN DATE
6-24-24
COMPLETION DATE
6-24-24
GROUNDWATER
READINGS
WEATHER NOTES
Warm, sunny
SURFACE ELEVATION
133.0 ft
LOGGED BY
L. Salemme/ K. Ocampo
DRILLER
Britton Exploration
TOTAL DEPTH OF BORING
31.5 ft
LOCATION DESCRIPTION BACKFILLED WITH
HAMMER TYPE
140-lb Autotrip
30' N of Southeast corner of Pond 14
ELEVATION (ft)
131
129
127
125
123
121
119
117
115
113
111
109
Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
(continued)
SHEET
1 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 26 18
26 38
0 1
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 25
--/--
A26 of 103
<
0.5PP
Lean CLAY (CL) (continued). SILTY SAND (SM); loose; brown; moist.
Bottom of borehole at 31.5 ft bgs
This Boring Record was developed in accordance with
the Caltrans Soil & Rock Logging, Classification, and
Presentation Manual (2022) except as noted on the Soil
or Rock Legend or below.
R6
27 29
--
60 100
0 0
4 6
6 9
11 ELEVATION (ft)
107
105
103
101
99 97
95 93
91 89
87 85
83 81
79 Remarks
Blows per footShear Strength(ksf)
PROJECT NUMBER
223-184
SHEET
2 of 2
DEPTH (ft) Moisture Content (%)
BORING NUMBER
24E14-04
Dry Unit Weight(pcf)
DESCRIPTION
Sample NumberRQD (%)
PROJECT NAME
Santa Maria WWTP
Sample LocationRecovery (%)Casing Depth
REVISION DATE
8/23/2024 Material Graphics Blows per 6 in. Drilling Method 5 BR - STANDARD 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 8/23/24 10 20
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 48
49 50
51 52
53 54
55 A27 of 103
6,/7<6$1'
60 PHGLXPGHQVHEURZQPRLVWLURQVWDLQLQJ
$//89,80
'HQVHOD\HUHGOLJKWJUD\LVKEURZQDQGJUD\
:HOOJUDGHG6$1'
6:
GHQVHJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SM
SM
SW
0 4
8 Depth (feet)
10 A28 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQPRWWOHGZLWK
EODFNPRLVWWUDFH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHEODFNPRLVW
:HOOJUDGHG6$1'
6:
GHQVHJUD\LVKEODFNPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI:(GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SW
SP-SM
SP
0 4
8 Depth (feet)
12 A29 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQDQGJUD\PRLVW
ZLWK&/$<SRFNHWVXSWR
$//89,80
6,/7<&/$<(<6$1'
6&60
GHQVHEODFNPRLVW
VHDPRIOHDQ&/$<
&/
VWLIIJUD\EURZQ
*UD\PRLVW
*UD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
Seam of CL
SP-SM
SC-SM
SC-SM
SC-SM
0 4
8 Depth (feet)
11 A30 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEURZQPRWWOHGZLWK
JUHHQPRLVWUXVWVWDLQV
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHEODFNDQGJUD\PRLVW
/LJKWJUD\LVKEURZQWUDFHFRDUVH*5$9(/
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI6(GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
0 4
8 Depth (feet)
10 Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP
SP
SP-SM
A31 of 103
3RRUO\JUDGHG6$1'
63 ORRVH\HOORZLVKEURZQPRLVW
$//89,80
/HDQ&/$<
&/
VWLIIEURZQPRLVWWUDFH*5$9(/LQWHUEHGGHGZLWKFRDUVH
6$1'DQG*5$9(/
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNDQGJUD\LVKEURZQ
*UD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
SP
CL
A32 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEURZQZLWKJUD\PRWWOLQJ
$//89,80
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\ZHWFRDUVH6$1'ZLWK
*5$9(/
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GHQVHEURZQILQH6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI((GJHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP-SM
SW
A33 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPVWLIIEURZQPRLVW
$//89,80
%ODFN
%ODFNDQGJUD\OD\HUILQHU6$1'*5$9(/
'HQVHJUD\LVKEURZQ
%URZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP-SM
SP-SM
SP-SM
SP-SM
A34 of 103
6,/7<6$1'
60 PHGLXPGHQVHEURZQPRLVWWUDFH*5$9(/
$//89,80
'HQVHGDUNEURZQWROLJKWJUD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SM
SM
A35 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GDUNJUD\PRLVWVRPH*5$9(/
$//89,80
%ODFNWRGDUNJUD\PRLVWPHGLXP6$1'
/LJKWJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
3$
*6)
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP-SM
SP-SM
0 4
8 Depth (feet)
10 A36 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHOLJKWEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNWRGDUNJUD\PRLVWPHGLXP
6$1'
/LJKWJUD\
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP
SP
0 4
8 Depth (feet)
10 A37 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQWRJUD\PRLVWIHZFRDUVH
*5$9(/
$//89,80
%ODFNSRFNHWVRI3RRUO\*UDGHG6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\WREODFNPRLVWPHGLXP6$1'
/LJKWJUD\WROLJKWEURZQ
6,/7<&/$<
&/0/
OLJKWJUD\WREODFNPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\WREODFNPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
\DUGV6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SP-SM
SP
SP
CL-ML
0 4
8 Depth (feet)
10 A38 of 103
6,/7<6$1'
60 OLJKWJUD\LVKEURZQPRLVW
$//89,80
:HOOJUDGHG6$1'
6:
OLJKWJUD\LVKEURZQPRLVWPHGLXPWRFRDUVH
*5$9(/PHGLXPWRFRDUVH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWILQHWRPHGLXP6$1'
6HHSDJH
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\PRLVWPHGLXP6$1'
5HGGLVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
\DUGV6(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
0 4
8 Depth (feet)
10 Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
SM
SW
SP
CL-ML
SP
SP
A39 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQIHZURXQGHG*5$9(/
$//89,80
&/$<(<6$1'ZLWK*5$9(/
6&
PHGLXPGHQVHURXQGHG*5$9(/
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPHGLXPWRFRDUVH6$1'
6,/7<&/$<
&/0/
UHGGLVKEURZQZLWKOHQVHVRISRRUO\JUDGHG6$1'
63 OLJKWJUD\PHGLXPJUDLQHG6$1'VHHSDJH
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
CL-ML
SC
A40 of 103
!"!#
$%"& '
#
'
$%"&#
( )( )
#
*
#
* +
,
-
#
.*
+
/#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
5%&5
.!)9& 6:
!%7)& &&"5
!
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
6(&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<<
<3
</
@A
@B
&: *
&
!.&%
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
D
/
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP
CL-ML
SP-SM
SP-SM
A41 of 103
*
-
$%"& !"!#
$%"&
+'2
#
-
$%"&#
.*
+
A#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
/
5%&5
.!)9& 6:
!%7)& &&"5
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
,
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
6:&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<<
<3
</
@A
&: *
&
!.&%
/
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SP-SM
SP
A42 of 103
@/ D@
-
-
$%"& !"!#
2 #
#
#
(
#
#
( )( ) #
'
#
.*
+
/#/ *
. %
'
0 +
''
'
)
1 %'2
, )
*'
,
-
3/33
4'
+
%'2
#
@, 3@,A
$%5!6&%
%&$
5$$& .(
7 .(
!%$ &8)"5
7&% &8)"5 &
&
!.&%
5%&5
.!)9& 6:
!%7)& &&"5
)5%)5%
"#$%&'(&(&'
&;!&
"&)*
&
%&
& )5&&
5 &: 57 %&):
&
5)5
= =&
-
.)97& 6:
(+
5)5 &
)%5
1:&RUQHURI3RQG
! 6
+'*
-
)
>
+
-
+
'
%5?&) !.&%
,
:&&
2 *
%5?&) &
&-(..
$
+'
&&"5 *
<3
</
@A
@B
@<
&: *
&
!.&%
&
)%5
%&"
5 &
,
%
2 &
5$ 33@A< 5$
.#$?)75%(&: .%%( (&:"<?!%( 3/3<#$.A=3@=3<
/
3 @
<
B
C
A
D
/
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP-SM
SP-SM
ML
SP-SM
CL-ML
SP
A43 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
EURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 EURZQPRLVW
6,/7<&/$<
&/0/
EURZQSHUFKHGZDWHU
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
IWRQ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI:VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
Depth (feet)
SP-SM
SP
CL-ML
A44 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVWPHGLXP6$1'
$//89,80
/LJKWJUD\
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWILQH6$1'
VHHSDJH
6,/7<&/$<
&/0/
JUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP-SM
SP
CL-ML
SP
A45 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
$//89,80
/LJKWJUD\
6,/7<&/$<
&/0/
OLJKWJUD\PRLVWZLWKOHQVHVRISRRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI6VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP
CL-ML
A46 of 103
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'ZLWK*5$9(/
63 OLJKWEURZQPRLVW
*UD\
6HHSDJH
6,/7<&/$<
&/0/
JUD\PRLVWZLWKOHQVHVRI3RRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
CL-ML
A47 of 103
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
$//89,80
'HQVHEODFN
&/$<SRFNHWV
/HDQ&/$<
&/
VWLIIEODFNPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHEODFNPRLVW
/HDQ&/$<
&/
VWLIIEODFNPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHJUD\PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI1VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SP
SP
CL
SP
CL
A48 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVWJUDYHOO\OD\HU
6$1'<6,/7
0/
JUHHQLVK\HOORZDQGJUD\PRLVW
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 UHGGLVKEURZQPRLVW
6,/7<&/$<
&/0/
UHGGLVKEURZQPRLVW
6,/7<6$1'
60 UHGGLVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 ML
SP-SM
CL-ML
SP
CL-ML
CL-ML
SM
A49 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVW
$//89,80
6,/7<&/$<
&/0/
UHGGLVKEURZQZLWKJUD\PRWWOLQJPRLVWSRFNHWRI
ZHOOJUDGHG6$1'ZLWK*5$9(/
6:
6HHSDJH
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
\HOORZLVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
IWRQ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI(VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 CL-ML
SP-SM
SP-SM
A50 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVW
$//89,80
:HOOJUDGHG6$1'ZLWK*5$9(/
6:
UHGGLVKEURZQPRLVW
6$1'<6,/7
0/
UHGGLVKEURZQPRLVW
3RRUO\JUDGHG6$1'
63 JUD\PRLVW
6$1'<6,/7
0/
UHGGLVKEURZQPRLVWZLWK6$1'OHQVHV
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SW
ML
SP
ML
SP
A51 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\PRLVWIHZFRDUVHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GDUNJUD\ZLWKEODFNVSRWVPRLVW
%ODFNJUDYHOO\OD\HU
/HDQ&/$<
&/
UHGGLVKEURZQPRLVWVHHSDJH
6$1'<6,/7
0/
EURZQPRLVW
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
2&
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP-SM
SP
SP
CL
ML
A52 of 103
6,/7
0/
JUD\LVKEURZQZLWKEODFNPRWWOLQJPRLVWIHZPHGLXPURXQGHG
*5$9(/
$//89,80
)LQH6$1'VHHSDJHLURQVWDLQLQJ
:HOOJUDGHG*5$9(/ZLWK6$1'
*:
EURZQDQGJUD\PRWWOHGPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21 '(6&5,37,21
&HQWHURI:VLGHRI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 ML
GW
SP-SM
SP
A53 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWPHGLXP
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 JUD\LVKEURZQPRLVWLURQVWDLQLQJSRFNHWRI6,/7
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
UHGGLVKEURZQWRJUD\LVKEURZQPRLVW
OD\HUHGZLWKFOHDQSRRUO\JUDGHG6$1'
63 3RRUO\JUDGHG6$1'
63 OLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
1RUWK6RXWK
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP-SM
SP
SP-SM
SP
A54 of 103
3RRUO\JUDGHG6$1'
63 GDUNEURZQPRLVWWUDFHURXQGHG*5$9(/PHGLXP
6$1'
$//89,80
/LJKWJUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWJUD\LVKEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
6(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP
SP
SP-SM
SP
A55 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVWWUDFHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
OLJKWJUD\LVKEURZQPRLVWILQH6$1'
3RRUO\JUDGHG6$1'
63 OLJKWJUD\LVKEURZQPRLVWPHGLXP6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1(&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP-SM
SP
A56 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
3UHGRPLQDQWHO\%,2),//
3RRUO\JUDGHG6$1'
63 JUD\PRLVW
'DUNJUD\
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
GDUNJUD\PRLVWILQH6$1'
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1:&RUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP
SP-SM
A57 of 103
!
"!
#
"$% &
#
!
%
!
" '
& ((!) '
" *
+
,
&
++ +
-
. *+/
0 -'+0
# 1)11
2+
&
*+/
!
3*$
4 5*
*5
3 $335 "6
%
"6
*
3 57-
$
%5* 57-
$
5 5
"5*
$*5
$
5 *5
5 -$55
"-85 49
*%
-5 55
$
!
-$
*
-$*
"#$ %&'%'%&
5:5
"$% ()$
5 *5
*
5 -$55
*
5 -
' ((
$
59 $% *5
-9
5 $-
$
;
;5 #
"
-8%5 49
'+
$-
$
5 -*$
4 #
-
&+'
<
&
#
&
+
*$=5-
"5*
955
/'
*$=5-
5 %,'
55 $
3&+
'
(>?
(>@
(>>
(>(
(1A
59 '
5 "5*
5 -*$
*5
$
5 *
/
@ 5
$3 11>(BC $3
"!3= -
%$*
659 "*
*6 659 C =
*6 1)1C!3" B;1>;1C
)
(
1 >
C
@
D
?
B
A
()
((
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
A58 of 103
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
JUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 EURZQPRLVW
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
EURZQPRLVWILQH6$1'
/HQVHRIOLJKWJUD\SRRUO\JUDGHG6$1'
63 %RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3,
//3/3,
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH/6DOHPPH
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
&HQWHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
11 SP-SM
SP
SP-SM
A59 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPHURXQGHG
*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 GHQVHOLJKW\HOORZLVKEURZQPRLVWWUDFH*5$9(/
:HOOJUDGHG6$1'
6:
GHQVHOLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
1HDU1:FRUQHURI3RQG
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
SW
A60 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQEODFNPRWWOHGPRLVW
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SP
SC
SW
A61 of 103
:HOOJUDGHG6$1'
6:
ORRVHJUD\LVKEURZQPRLVWVRPH*5$9(/VRPH
ILQHV
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHOLJKWEURZQDQGJUD\PRLVWVRPH
*5$9(/
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHOLJKWJUD\LVKEURZQPRLVW
&/$<SRFNHWVIURPWRIHHW
6$1'<IDW&/$<
&+
PHGLXPVWLIIOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SW
SP
SW
CH
A62 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH *5$9(/VRPHILQHV
$//89,80
<HOORZLVKEURZQ
6$1'<IDW&/$<
&+
VWLII\HOORZLVKEURZQZLWKJUD\DQGZKLWHPRWWOLQJPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHOLJKWEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CH
SP
SP
A63 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\PRLVW
%ODFN&/$<SRFNHWV
6,/7<&/$<
&/0/
VWLIIEURZQZHW
:HOOJUDGHG6$1'
6:
JUD\DQGEODFN
/LJKWJUD\LVKEURZQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
SW
CL-ML
SW
A64 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\PRLVWZLWKEURZQIDW&/$<
&+
SRFNHWV
'HQVHFOHDQ
/HDQ&/$<
&/
VWLIIEURZQWROLJKWEURZQPRLVW
3RRUO\JUDGHG6$1'
63 GHQVHOLJKWJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CL
SC
SW
SP
A65 of 103
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\LVKEURZQPRLVWVRPH *5$9(/VRPHILQHV
$//89,80
6,/7<&/$<ZLWK6$1'
&/0/
VWLIIOLJKWEURZQZLWKJUD\VWUHDNLQJ
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 *5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 CL-ML
SP
SW
A66 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVWWUDFH*5$9(/
$//89,80
3RRUO\JUDGHG6$1'ZLWK&/$<
636&
GHQVHJUD\LVKEURZQWROLJKWEURZQ
PRLVW
6,/7<&/$<(<6$1'
6&60
PHGLXPGHQVHJUD\LVKEURZQPRLVW
:HOOJUDGHG6$1'
6:
PHGLXPGHQVHJUD\LVKEURZQPRLVWFOHDQ
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP-SC
SC-SM
SW
A67 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
:HOOJUDGHG6$1'ZLWK&/$<
6:6&
JUD\LVKEURZQZLWKEODFNVSRWVPRLVW
5HGGLVKEURZQOD\HURIVLOW\&/$<
&/0/
:HOOJUDGHG6$1'
6:
JUD\LVKEURZQPRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
SW-SC
SW
A68 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\DQGEODFNPRLVW
&/$</D\HU
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
SP
A69 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQZLWKEODFNVSRWVPRLVW
$//89,80
/LJKWEURZQ
6$1'<IDW&/$<
&+
VWLIIOLJKWEURZQPRLVWWUDFH*5$9(/
3RRUO\JUDGHG6$1'ZLWK&/$<
636&
PHGLXPGHQVHOLJKW\HOORZLVKEURZQ
PRLVW
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3 3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
SC
CH
SP-SC
A70 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHJUD\DQGEODFNPRLVW
WRLQFK&/$<DQG*5$9(/SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
8 Depth (feet)
10 SC
SP
A71 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQWREODFNPRLVW
$//89,80
3RRUO\JUDGHG6$1'ZLWK6,/7
6360
PHGLXPGHQVHEODFNPRLVW&/$<
SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
3$
*6)
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW(RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
5 Depth (feet)
SC
SP-SM
A72 of 103
&/$<(<6$1'
6&
PHGLXPGHQVHJUD\LVKEURZQWREODFNPRLVW
$//89,80
3RRUO\JUDGHG6$1'
63 PHGLXPGHQVHEODFNPRLVW&/$<SRFNHWV
%RWWRPRIWHVWSLWDWIWEJV
7KLV%RULQJ5HFRUGZDVGHYHORSHGLQDFFRUGDQFHZLWKWKH&DOWUDQV6RLO 5RFN /RJJLQJ&ODVVLILFDWLRQDQG3UHVHQWDWLRQ0DQXDO
H[FHSWDVQRWHGRQWKH
6RLORU5RFN/HJHQGRUEHORZ
*5281':$7(5
5($',1*6
/2**('%<
+ %UDNH&:LOOLDPV
),1$/%<
5 +RRNH
'85,1*(;&$9$7,21
1$
$)7(5(;&$9$7,21
'$7(
7(673,7180%(5
73 25,(17$7,21
(DVW:HVW
%8&.(7:,'7+
IW
685)$&((/(9$7,21
IW
&2175$&725
-RVSHK(QJLQHHULQJ
(48,30(17
-RKQ'HHUH%DFNKRH
'$7(67$57('
'$7(&203/(7('
727$/'(37+2)75(1&+
IW
7(673,7/2&$7,21
/DW/RQJRU1RUWK(DVWDQG'DWXP
%$&.),//(':,7+
1DWLYH
/2&$7,21'(6&5,37,21
IHHW6RI73
6DPSOH/RFDWLRQ6DPSOH1XPEHU0RLVWXUH&RQWHQW
'U\8QLW:HLJKW
SFI
352-(&7180%(5
6+((7
RI
6KHDU6WUHQJWK
NVI
352-(&71$0(
6DQWD0DULD::73
(/(9$7,21
IW
0DWHULDO*UDSKLFV
'(37+
IW
7(673,7180%(5
73 '(6&5,37,21
5(9,6,21'$7(
5HPDUNV
7(673,7/2*/2*6$1'/$%*3-&$/,)251,$<(+/,%5$5<
<(+9-$18$5<
*/%
Horizontal: 1 inch = 4 feet
SCALE
VerƟcal: 1 inch = 4 feet
0 4
5 Depth (feet)
SC
SP
A73 of 103
3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO &OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\ 6LOW\VDQGWRVDQG\VLOW &OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG 9HU\VWLIIVDQGWRFOD\H\VDQG 9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A74 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A75 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A76 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A77 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A78 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A79 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A80 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A81 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A82 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A83 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A84 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A85 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A86 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A87 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A88 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A89 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A90 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A91 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A92 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A93 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A94 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A95 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A96 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A97 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A98 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A99 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A100 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A101 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A102 of 103 3URMHFW 60::733HUFRODWLRQ3RQGV6WXG\
7RWDOGHSWKIW'DWH
6XUIDFH(OHYDWLRQIW
6DQWD0DULD&DOLIRUQLD
&RRUGV;<
&RQH7\SHFPð
&RQH2SHUDWRU*'7
&37&37
/RFDWLRQ
6%7QOHJHQG
6HQVLWLYHILQHJUDLQHG2UJDQLFPDWHULDO&OD\WRVLOW\FOD\
&OD\H\VLOWWRVLOW\FOD\6LOW\VDQGWRVDQG\VLOW&OHDQVDQGWRVLOW\VDQG *UDYHO\VDQGWRVDQG9HU\VWLIIVDQGWRFOD\H\VDQG9HU\VWLIIILQHJUDLQHG &3H7,7Y&378GDWDSUHVHQWDWLRQ LQWHUSUHWDWLRQVRIWZDUH5HSRUWFUHDWHGRQ30 3URMHFWILOH&?8VHUV?MNLQJ?<HKDQG$VVRFLDWHV,QF?&LW\RI6DQWD0DULD::733HUFRODWLRQ3RQGV*HQHUDO?&37?60::73&37'DWDFSW A103 of 103
APPENDIX B - LABORATORY TEST RESULTS
24E04-01 58a 20.0 MCAL 103 87 19 0 73 27 -- -- -- -- -- -- -- -- -- -- P CLAYEY SAND (SC) 24E04-01 59 25.0 MCAL -- -- -- 0 93 7 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E04-01 61 30.0 MCAL 111 101 11 0 95 5 -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND with SILT (SP-SM) 24E04-02 65 20.0 SPT -- -- -- 1 94 5 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E04-03 72 20.0 SPT -- -- -- 1 95 4 -- -- -- -- -- -- -- -- -- -- -- POORLY GRADED SAND (SP) 24E06-01 33 20.0 MCAL -- -- -- 0 93 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E06-02 40 25.0 MCAL -- -- -- 18 76 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY and GRAVEL (SP-SC)
24E06-02 41a 30.0 MCAL 117 103 13 0 45 55 -- -- -- -- -- -- -- -- -- -- P SANDY lean CLAY (CL) 24E06-03 47 30.0 MCAL 119 100 19 0 59 40 -- -- -- -- -- -- -- -- -- -- P SILTY SAND (SM) 24E06-04 52 20.0 MCAL -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24E14-01 4 20.0 MCAL -- -- -- 2 81 17 -- -- -- -- -- -- -- -- -- -- -- CLAYEY SAND (SC) 24E14-01 6 30.0 MCAL 121 98 24 0 39 61 -- -- -- -- -- -- -- -- -- -- P SANDY lean CLAY (CL) 24E14-02 14 25.0 MCAL 108 101 7 0 97 3 -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24E14-03 19 20.0 MCAL -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24E14-04 26 20.0 MCAL -- -- -- 0 95 5 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24TP02-01 CRUST 0.0 GRAB -- -- -- 0 76 24 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP02-01 5 2.3 MCAL 109 91 20 0 84 16 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP02-02 6 2.0 OTHER -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP02-02 8 3.0 GRAB 116 96 20 -- -- -- -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND (SP) 24TP02-03 9 1.0 MCAL 119 102 17 0 61 39 -- -- -- -- -- -- -- -- -- -- -- SILTY, CLAYEY SAND (SC-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
1 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B1 of 49
24TP02-04 1 2.0 OTHER 124 103 21 -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP02-06 11 4.0 MCAL 115 95 21 0 91 9 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24TP02-07 10 2.5 MCAL 115 92 24 1 90 9 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) 24TP02-08 12 2.0 MCAL 108 88 24 0 87 13 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP04-01 10 0.0 GRAB -- -- 12 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND with SILT (SP-SM) 24TP04-01 11 3.0 GRAB -- -- 17 2 91 7 -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND with SILT (SP-SM) 24TP04-02 12 3.0 GRAB -- -- 17 1 95 4 -- -- -- -- -- -- -- -- -- -- OC POORLY GRADED SAND (SP) 24TP04-04 13 0.0 GRAB -- -- -- 1 86 13 -- -- -- -- -- -- -- -- -- -- -- SILTY SAND (SM) 24TP06-01 1 4.0 GRAB 121 93 30 -- -- -- 8 31 -- -- -- -- -- -- -- -- P SILT (ML) 24TP06-05 2 4.0 GRAB -- -- -- 31 67 2 -- -- -- -- -- -- -- -- -- -- -- POORLY GRADED SAND with GRAVEL (SP) 24TP06-06 7 0.0 GRAB -- -- 4 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND (SP) 24TP06-06 3 3.5 GRAB 111 104 7 -- -- -- -- -- -- -- -- -- -- -- -- -- P Poorly graded SAND (SP) 24TP06-07 5 3.0 GRAB 121 100 22 -- -- -- 8 26 -- -- -- -- -- -- -- -- P SILTY CLAY (CL-ML) 24TP06-09 6 3.0 GRAB 119 92 29 -- -- -- 2 24 -- -- -- -- -- -- -- -- P SANDY SILT (ML) 24TP08-01 16 4.0 GRAB -- -- 9 -- -- -- -- -- -- -- -- -- -- -- -- -- OC Poorly graded SAND (SP) 24TP08-02 17 2.0 GRAB -- -- -- 1 4 95 -- -- -- -- -- -- -- -- -- -- -- SILT (ML) 24TP11-05 9 5.0 GRAB 115 89 28 -- -- -- 3 21 -- -- -- -- -- -- -- -- P SANDY SILT (ML) 24TP14-04 3 4.0 MCAL 124 102 22 -- -- -- -- -- -- -- -- -- -- -- -- -- P SANDY fat CLAY (CH) 24TP14-07 5 3.5 MCAL 121 91 32 -- -- -- -- -- -- -- -- -- -- -- -- -- P SILTY CLAY with SAND (CL-ML) 24TP14-08 4 3.5 GRAB -- -- -- 0 71 28 -- -- -- -- -- -- -- -- -- -- -- SILTY, CLAYEY SAND (SC-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
2 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B2 of 49
24TP14-11 8 2.5 MCAL 117 91 29 -- -- -- -- -- -- -- -- -- -- -- -- -- P SANDY fat CLAY (CH) 24TP14-11 9 3.5 GRAB -- -- -- 0 94 6 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with CLAY (SP-SC) 24TP14-13 10 3.0 GRAB -- -- -- 0 93 7 -- -- -- -- -- -- -- -- -- -- -- Poorly graded SAND with SILT (SP-SM) Total Unit Weight, t, (pcf)
Dry Unit Weight, d
, (pcf)
MoistureContent (%)
Gravel (%)Sand (%)Fines (%)
Plasticity Index (PI)
Liquid Limit (LL)
pH
Resistivity( - cm)
Optimum MoistureContent (%)R-Value
Compaction
Additional Testing
2- (mg/kg)
(mg/kg) Cl
- SO4
Expansion Index
Gradation Corrosion
Sample
Type
Soil/Rock Classification
Sample Information
SUMMARY OF LABORATORY TEST RESULTS
Boring
No.
Sample
No.
Depth
(ft)
Atterberg
Max. Dry UnitWeight, d, MAX, (pcf)
YEH SUMMARY OF TEST RESULTS 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24
PROJECT MANAGER
J. King
CHECKED BY
J. King
SHEET
3 of 3
PREPARED BY
R. Hooke
PROJECT NO.
223-184
PROJECT NAME
Santa Maria WWTP
REVISION DATE
10-1-24
B3 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24E04-01
24E04-02
24E04-03
24E06-01
24E06-02
25.0 ft
20.0 ft
20.0 ft
20.0 ft
25.0 ft
25.0 ft
20.0 ft
20.0 ft
20.0 ft
25.0 ft
24E04-01
24E04-02
24E04-03
24E06-01
24E06-02
Classification LL PL PI Cc
D30 D10
0.135
0.127
0.173
0.12 0.207
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
7.1 5.5
4.2 6.4
5.5 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with SILT (SP-SM)
POORLY GRADED SAND (SP)
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with CLAY and GRAVEL (SP-SC)
%Sand %Clay
92.9 93.6
94.8 93.5
76.3 %Gravel %Silt
0.0 1.0
1.1 0.1
18.2 D100 D50
9.5 19
9.5 9.5
19 0.38
0.268
0.341
0.259
0.529
0.606
0.372
0.509
0.33 0.944
0.752
0.446
0.611
0.373
1.352
5.58 3.50
3.53 3.10
6.55 Cu
1.43 1.26
1.10 1.50
1.00 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
1 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B4 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24E06-04
24E14-01
24E14-03
24E14-04
24TP02-01
20.0 ft
20.0 ft
20.0 ft
20.0 ft
0.0 ft
20.0 ft
20.0 ft
20.0 ft
20.0 ft
0.0 ft
24E06-04
24E14-01
24E14-03
24E14-04
24TP02-01
Classification LL PL PI Cc
18.5 D30 D10
0.161
-- 0.105
0.174
0.012
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
6.3 16.8
6.1 5.4
14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
Poorly graded SAND with SILT (SP-SM)
CLAYEY SAND (SC)
Poorly graded SAND with CLAY (SP-SC)
Poorly graded SAND with CLAY (SP-SC)
SILTY SAND (SM)
%Clay
5.6 %Sand
93.7 81.4
93.9 94.6
75.8 %Gravel %Silt
0.0 1.8
0.0 0.0
0.0 D100 D50
4.75 19
9.5 9.5
2 0.376
0.279
0.255
0.357
0.145
0.531
0.485
0.342
0.518
0.298
0.612
0.581
0.395
0.607
0.374
3.80 -- 3.76
3.49 32.03
Cu
1.44 -- 1.57
1.21 4.83
YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
2 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B5 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP02-01
24TP02-03
24TP02-04
24TP02-06
24TP02-07
2.3 ft
1.0 ft
2.0 ft
4.0 ft
2.5 ft
2.3 ft
1.0 ft
2.0 ft
4.0 ft
2.5 ft
24TP02-01
24TP02-03
24TP02-04
24TP02-06
24TP02-07
Classification LL PL PI Cc
12.5 24.4
7.7 7.9
D30 D10
0.046
0.002
0.033
0.077
0.079
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILTY SAND (SM)
SILTY, CLAYEY SAND (SC-SM)
Poorly graded SAND (SP)
Poorly graded SAND with SILT (SP-SM)
Poorly graded SAND with SILT (SP-SM)
%Clay
3.8 14.5
4.6 1.7
1.4 %Sand
83.7 60.6
90.6 90.0
%Gravel %Silt
0.0 0.4
0.0 0.6
D100 D50
1.18 9.5
4.75 9.5
0.102
0.037
-- 0.153
0.194
0.157
0.154
-- 0.191
0.301
0.18 0.198
-- 0.214
0.361
3.90 93.02
-- 2.80
4.59 Cu
1.26 3.27
-- 1.42
1.32 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
3 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B6 of 49
0 5
10 15
20 25
30 35
40 45
50 55
60 65
70 75
80 85
90 95
100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP02-08
24TP04-01
24TP04-02
24TP04-04
24TP06-05
2.0 ft
3.0 ft
3.0 ft
0.0 ft
4.0 ft
2.0 ft
3.0 ft
3.0 ft
0.0 ft
4.0 ft
24TP02-08
24TP04-01
24TP04-02
24TP04-04
24TP06-05
Classification LL PL PI Cc
10.3 5.5
4.0 11.1
D30 D10
0.059
0.159
0.114
0.053
0.339
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
--
--
-- Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810
2.3 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILTY SAND (SM)
Poorly graded SAND with SILT (SP-SM)
POORLY GRADED SAND (SP)
SILTY SAND (SM)
POORLY GRADED SAND with GRAVEL (SP)
%Clay
2.5 1.3
0.3 2.0
%Sand
87.2 91.5
95.1 85.6
66.9 %Gravel %Silt
0.0 1.7
0.5 1.3
30.8 D100 D50
4.75 12.5
9.5 12.5
76.2 0.109
0.382
0.212
0.308
0.727
0.161
0.566
0.323
0.452
1.363
0.186
0.689
0.402
0.548
1.866
3.15 4.33
3.51 10.41
5.50 Cu
1.08 1.33
0.98 3.29
0.83 YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
4 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B7 of 49
>>
0 >>
5 10
15 20
25 30
35 40
45 50
55 60
65 70
75 80
85 90
95 100
100 10 1 0.1 0.01 0.001
40 50
GRAIN SIZE IN MILLIMETERS
Specimen Identification
24TP08-02
24TP14-08
24TP14-11
24TP14-13
2.0 ft
3.5 ft
3.5 ft
3.0 ft
2.0 ft
3.5 ft
3.5 ft
3.0 ft
24TP08-02
24TP14-08
24TP14-11
24TP14-13
Classification LL PL PI Cc
83.9 15.7
3.9 6.2
D30 D10
0.005
0.003
0.153
0.125
D60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 6 30
PERCENT FINER BY WEIGHT
3 2 3 6 100140
--
--
--
--
--
--
--
--
--
--
--
--
Specimen Identification
GRAIN SIZE DISTRIBUTION
4 200 1.5 1
3/4 1/23/8 4 810 14 20 60 16
coarse
SAND
fine COBBLES GRAVELfine coarse medium SILT OR CLAY
SILT (ML)
SILTY, CLAYEY SAND (SC-SM)
Poorly graded SAND with CLAY (SP-SC)
Poorly graded SAND with SILT (SP-SM)
%Clay
11.2 12.5
2.5 0.5
%Sand
3.7 71.5
93.6 93.3
%Gravel %Silt
1.2 0.3
0.0 0.0
D100 D50
9.5 9.5
9.5 4.75
0.013
0.087
0.285
0.245
0.029
0.226
0.386
0.351
0.036
0.304
0.442
0.4 7.63
117.87
2.90 3.19
Cu
1.01 9.72
1.21 1.20
YEH SIEVE 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
5 of 5
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B8 of 49
Project No.
Testing Date
24E4‐01 Sample No. 58A Depth (ft) 20.0
Soil Description
Dish ID 106 288.36 Water Content 0.0%
Dish Mass (g) 128.47 288.36 Dry Post‐Wash (g) 118.25
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
No. 10 2.00 0.06 0.0% 100.0%
No. 20 0.84 0.30 0.2% 99.8%
No. 40 0.425 0.35 0.4% 99.6%
No. 60 0.250 1.69 1.5% 98.5%
No. 100 0.150 49.31 32.3% 67.7%
No. 200 0.075 64.94 73.0% 27.0%
Pan ‐‐ 1.76 Sieve Continuity 99.9%
116.65
118.41
0.00 0.06
0.36 0.71
2.40 51.71
0.00 0.00
0.00 0.00
0.00 0.00
4" of poorly‐graded SAND (SP) with 1" of lean CLAY (CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B9 of 49
Project No.
Testing Date
24E4‐01 Sample No. 61 Depth (ft) 30.0
Soil Description
Dish ID 121 288.54 Water Content 0.0%
Dish Mass (g) 128.56 288.54 Dry Post‐Wash (g) 151.97
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.15 0.1% 99.9%
No. 10 2.00 2.93 1.9% 98.1%
No. 20 0.84 27.75 19.3% 80.7%
No. 40 0.425 66.21 60.7% 39.3%
No. 60 0.250 31.86 80.6% 19.4%
No. 100 0.150 16.96 91.2% 8.8%
No. 200 0.075 6.28 95.1% 4.9%
Pan ‐‐ 0.21 Sieve Continuity 99.8%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND (SP): gray brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
152.14
152.35
0.15 3.08
30.83 97.04
128.90
145.86
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
Cu=3.9
Cc=1.2
B10 of 49
Project No.
Testing Date
24E6‐02 Sample No. 41A Depth (ft) 30.0
Soil Description
Dish ID 122 245.68 Water Content 0.0%
Dish Mass (g) 128.56 245.68 Dry Post‐Wash (g) 53.03
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.0% 100.0%
No. 10 2.00 0.00 0.0% 100.0%
No. 20 0.84 0.18 0.2% 99.8%
No. 40 0.425 2.32 2.1% 97.9%
No. 60 0.250 10.92 11.5% 88.5%
No. 100 0.150 21.72 30.0% 70.0%
No. 200 0.075 17.20 44.7% 55.3%
Pan ‐‐ 0.81 Sieve Continuity 99.8%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
52.34 53.15
0.00 0.00
0.18 2.50
13.42 35.14
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B11 of 49
Project No.
Testing Date
24E6‐03 Sample No. 47 Depth (ft) 30.0
Soil Description
Dish ID 115 333.15 Water Content 0.0%
Dish Mass (g) 128.21 333.15 Dry Post‐Wash (g) 122.76
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.76 0.4% 99.6%
No. 10 2.00 0.57 0.6% 99.4%
No. 20 0.84 2.39 1.8% 98.2%
No. 40 0.425 29.32 16.1% 83.9%
No. 60 0.250 40.01 35.6% 64.4%
No. 100 0.150 31.19 50.9% 49.1%
No. 200 0.075 18.25 59.8% 40.2%
Pan ‐‐ 1.12 Sieve Continuity 99.3%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM) with lean CLAY (CL) seams: light brown, mois
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
122.49
123.61
0.76 1.33
3.72 33.04
73.05 104.24
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B12 of 49
Project No.
Testing Date
24E14‐01 Sample No. 6 Depth (ft) 30.0
Soil Description
Dish ID 107 224.20 Water Content 0.0%
Dish Mass (g) 128.09 224.20 Dry Post‐Wash (g) 38.52
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
No. 10 2.00 0.01 0.0% 100.0%
No. 20 0.84 0.09 0.1% 99.9%
No. 40 0.425 0.57 0.7% 99.3%
No. 60 0.250 3.47 4.3% 95.7%
No. 100 0.150 14.54 19.4% 80.6%
No. 200 0.075 18.81 39.0% 61.0%
Pan ‐‐ 1.26 Sieve Continuity 99.4%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY CL): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
37.49 38.75
0.00 0.01
0.10 0.67
4.14 18.68
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
B13 of 49
Project No.
Testing Date
24E14‐02 Sample No. 14 Depth (ft) 25.0
Soil Description
Dish ID 102 387.28 Water Content 0.0%
Dish Mass (g) 128.55 387.28 Dry Post‐Wash (g) 250.29
Sieve No. Size, mm Mass Retained (g) % Retained % Passing 3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.00 0.0% 100.0%
No. 4 * 4.75 0.35 0.1% 99.9%
No. 10 2.00 5.98 2.4% 97.6%
No. 20 0.84 28.56 13.5% 86.5%
No. 40 0.425 75.67 42.7% 57.3%
No. 60 0.250 86.40 76.1% 23.9%
No. 100 0.150 42.24 92.5% 7.5%
No. 200 0.075 11.08 96.7% 3.3%
Pan ‐‐ 0.34 Sieve Continuity 99.9%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Mechnical Sieve Analysis
Test Method: ASTM D6913, D2487
Project Name SMWWTP 223‐184
Tested By GF July 2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND (SP): light brown, moist
SIEVE MEASUREMENTS
Moist Soil + Dish (g)
Dry Soil + Dish (g)
Cumulative Retained (g)
0.00 0.00
0.00 0.00
0.00 0.00
250.28
250.62
0.35 6.33
34.89 110.56
196.96
239.20
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100.00 10.00 1.00 0.10 0.01
% Passing
Particle Diameter (mm)
Gradation Curve
Cu=2.8
Cc=1
B14 of 49
Project No.
Testing Date
24TP2‐2 Sample No. 6 Depth (ft) 2.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 102.68 102.68
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
102.68 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 102.68
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 102.68 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
102.68
Post Wash ID 108
Dry Mass Post Wash
(g) 95.06
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
5.27 5.27 5.1% 94.9% 94.9%
21.72 26.99 26.3% 73.7% 73.7%
25.67 52.66 51.3% 48.7% 48.7%
27.41 80.07 78.0% 22.0% 22.0%
13.87 93.94 91.5% 8.5% 8.5%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM): red yelllow with black staining, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 102.68
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B15 of 49
Project No.
Testing Date
24TP2‐2 Sample No. 6 Depth (ft) 2.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly‐graded SAND with silt (SP‐SM): red yelllow with black staining, moist
0.00 93.94 101.2%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 102.68 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 102.68
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 11.0 21.0 14.5 0.0358 6.7% 6.7%
5 10.0 21.0 14.7 0.0227 5.8% 5.8%
15 9.0 21.0 14.8 0.0132 4.8% 4.8%
30 9.0 21.0 14.8 0.0093 4.8% 4.8%
60 8.5 21.0 14.9 0.0066 4.3% 4.3%
90 8.0 21.0 15.0 0.0054 3.9% 3.9%
120 8.0 21.0 15.0 0.0047 3.9% 3.9%
240 7.0 21.0 15.2 0.0033 2.9% 2.9%
480 7.0 21.0 15.2 0.0024 2.9% 2.9%
1440 6.5 20.0 15.2 0.0014 2.4% 2.4%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B16 of 49
Project No.
Testing Date
24TP2‐4 Sample No. 1 Depth (ft) 2.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 104.28 104.28
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
104.28 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 104.28
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 104.28 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
104.28
Post Wash ID 110
Dry Mass Post Wash
(g) 88.52
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.86 1.86 1.8% 98.2% 98.2%
7.07 8.93 8.5% 91.5% 91.5%
21.99 30.92 29.5% 70.5% 70.5%
37.58 68.50 65.5% 34.5% 34.5%
18.31 86.81 83.0% 17.0% 17.0%
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan 104.28
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Silty SAND (SM): red yelllow with black staining, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
B17 of 49
Project No.
Testing Date
24TP2‐4 Sample No. 1 Depth (ft) 2.0
Soil Description
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Silty SAND (SM): red yelllow with black staining, moist
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
1.05 87.86 100.8%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 104.64 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 104.64
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 16.0 21.0 13.7 0.0347 11.4% 11.4%
5 14.0 21.0 14.0 0.0222 9.5% 9.5%
15 12.0 21.0 14.3 0.0130 7.6% 7.6%
30 11.0 21.0 14.5 0.0092 6.6% 6.6%
60 11.0 21.0 14.5 0.0065 6.6% 6.6%
90 10.0 21.0 14.7 0.0054 5.7% 5.7%
120 10.0 21.0 14.7 0.0046 5.7% 5.7%
240 9.5 21.0 14.7 0.0033 5.2% 5.2%
480 9.5 21.0 14.7 0.0023 5.2% 5.2%
1440 9.0 20.0 14.8 0.0014 4.7% 4.7%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B18 of 49
Project No.
Testing Date
24TP6-1 Sample No. 1 Depth (ft) 4.0
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 51.10 51.10
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
51.10 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 51.10
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 51.10 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.10 Post Wash ID 110
Dry Mass Post Wash
(g) 4.70
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
No. 20 0.850 0.00 0.00 0.0% 100.0% 100.0%
No. 40 0.425 0.13 0.13 0.3% 99.7% 99.7%
No. 60 0.250 0.12 0.25 0.5% 99.5% 99.5%
No. 100 0.150 0.45 0.70 1.4% 98.6% 98.6%
No. 200 0.075 3.61 4.31 8.4% 91.6% 91.6%
0.51 4.82 97.5%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): olive brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 51.10
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B19 of 49
Project No.
Testing Date
24TP6-1 Sample No. 1 Depth (ft) 4.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): olive brown, moist
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 51.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 35.5 22.5 10.5 0.0300 57.2% 57.2%
5 28.0 22.5 11.7 0.0201 42.6% 42.6%
15 22.0 22.5 12.7 0.0121 31.0% 31.0%
30 20.0 22.5 13.0 0.0086 27.1% 27.1%
60 17.5 22.5 13.4 0.0062 22.3% 22.3%
90 16.0 22.5 13.7 0.0051 19.4% 19.4%
120 15.5 22.5 13.8 0.0044 18.4% 18.4%
240 15.0 23.0 13.8 0.0031 17.4% 17.4%
480 13.5 23.0 14.1 0.0022 14.5% 14.5%
1440 13.0 21.0 14.2 0.0013 13.6% 13.6%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B20 of 49
Project No.
Testing Date
24TP6-6 Sample No. 3 Depth (ft) 3.5
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 682.47 682.47
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.00 0.0% 100.0%
1/2 in * 12.7 7.77 1.1% 98.9%
3/8 in * 9.50 13.79 3.2% 96.8%
No. 4 * 4.75 18.39 5.9% 94.1%
642.46 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 121.50
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 121.50 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 7.40 93.9% 88.4%
114.10
Post Wash ID 121
Dry Mass Post
Wash (g) 108.88
Sieve No. Size, mm Mass Retained (g)
Cum. Ret.
(g) % Retained % Passing
Combined %
Passing
No. 20 0.850 37.21 37.21 32.6% 67.4% 59.6%
No. 40 0.425 46.27 83.48 73.2% 26.8% 23.7%
No. 60 0.250 16.55 100.03 87.7% 12.3% 10.9%
No. 100 0.150 6.03 106.06 93.0% 7.0% 6.2%
No. 200 0.075 2.65 108.71 95.3% 4.7% 4.2%
0.15 108.86 100.0%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly-graded SAND (SP): red yellow, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 7.77
21.56 39.95
Pan 682.41
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
6.1%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B21 of 49
Project No.
Testing Date
24TP6-6 Sample No. 3 Depth (ft) 3.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Poorly-graded SAND (SP): red yellow, moist
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 114.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 114.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 11.0 22.5 14.5 0.0353 4.3% 3.8%
5 10.0 22.5 14.7 0.0225 3.5% 3.1%
15 9.0 22.5 14.8 0.0130 2.6% 2.3%
30 9.0 22.5 14.8 0.0092 2.6% 2.3%
60 8.5 22.5 14.9 0.0065 2.2% 1.9%
90 8.0 22.5 15.0 0.0054 1.7% 1.5%
120 7.5 22.5 15.1 0.0046 1.3% 1.2%
240 7.0 23.0 15.2 0.0033 0.9% 0.8%
480 6.0 23.0 15.3 0.0023 0.0% 0.0%
1440 6.0 21.0 15.3 0.0014 0.0% 0.0%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B22 of 49
Project No.
Testing Date
24TP11-5 Sample No. 9 Depth (ft) 5.0
Soil Description
Tray ID -- Air-Dry Soil Mass (g) 100.30 100.30
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
100.30 Sieve Continuity 100.0%
0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 100.30
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 100.30 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
100.30
Post Wash ID 112
Dry Mass Post
Wash (g) 57.44
Sieve No. Size, mm Mass Retained (g)
Cum. Ret.
(g) % Retained % Passing
Combined %
Passing
No. 20 0.850 0.01 0.01 0.0% 100.0% 100.0%
No. 40 0.425 0.02 0.03 0.0% 100.0% 100.0%
No. 60 0.250 0.23 0.26 0.2% 99.8% 99.8%
No. 100 0.150 13.47 13.73 12.0% 88.0% 88.0%
No. 200 0.075 40.27 54.00 47.3% 52.7% 52.7%
3.51 57.51 99.9%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
0.00 Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy SILT (ML) brown, wet
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air-Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 100.30
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
Pan Sieve Continuity
B23 of 49
Project No.
Testing Date
24TP11-5 Sample No. 9 Depth (ft) 5.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223-184
Tested By GF 6/3/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy SILT (ML) brown, wet
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID -- Moist Soil + Dish (g) 1.00 Mass of Air-Dried Soil (g) 114.10 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 114.10
Composite Correction 6
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 24.5 22.5 12.3 0.0325 16.1% 16.1%
5 20.0 22.5 13.0 0.0212 12.1% 12.1%
15 16.0 22.5 13.7 0.0125 8.7% 8.7%
30 14.5 22.5 13.9 0.0089 7.4% 7.4%
60 13.5 22.5 14.1 0.0064 6.5% 6.5%
90 13.0 22.5 14.2 0.0052 6.1% 6.1%
120 12.5 22.5 14.3 0.0045 5.6% 5.6%
240 12.0 23.0 14.3 0.0032 5.2% 5.2%
480 11.5 23.0 14.4 0.0022 4.8% 4.8%
1440 11.0 21.0 14.5 0.0013 4.3% 4.3%
HYDROMETER
Corrected Dry Mass (g)
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001 % Passing
Particle Diameter (mm)
Gradation Curve
B24 of 49
Project No.
Testing Date
24TP14‐4 Sample No. 3 Depth (ft) 4.0
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 52.95 52.95
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
52.95 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 52.95
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 52.95 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
52.95 Post Wash ID 118
Dry Mass Post Wash
(g) 21.35
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.79 1.79 3.4% 96.6% 96.6%
3.31 5.10 9.6% 90.4% 90.4%
6.02 11.12 21.0% 79.0% 79.0%
5.33 16.45 31.1% 68.9% 68.9%
3.97 20.42 38.6% 61.4% 61.4%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 52.95
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B25 of 49
Project No.
Testing Date
24TP14‐4 Sample No. 3 Depth (ft) 4.0
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Sandy lean CLAY (CL): yelllow brown, moist
0.19 20.61 103.6%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 52.95 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 52.95
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 33.0 21.0 10.9 0.0310 54.2% 54.2%
5 31.0 21.0 11.2 0.0199 50.5% 50.5%
15 28.0 21.0 11.7 0.0117 44.9% 44.9%
30 26.0 21.0 12.0 0.0084 41.1% 41.1%
60 24.0 21.0 12.4 0.0060 37.4% 37.4%
90 22.0 21.0 12.7 0.0050 33.7% 33.7%
120 21.5 21.0 12.8 0.0043 32.7% 32.7%
240 20.0 21.0 13.0 0.0031 29.9% 29.9%
480 19.0 21.0 13.2 0.0022 28.0% 28.0%
1440 15.5 20.0 13.8 0.0013 21.5% 21.5%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B26 of 49
Project No.
Testing Date
24TP14‐7 Sample No. 5 Depth (ft) 3.5
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 51.24 51.24
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
51.24 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 51.24
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 51.24 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.24 Post Wash ID 116
Dry Mass Post Wash
(g) 1.27
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
0.12 0.12 0.2% 99.8% 99.8%
0.11 0.23 0.4% 99.6% 99.6%
0.13 0.36 0.7% 99.3% 99.3%
0.30 0.66 1.3% 98.7% 98.7%
0.58 1.24 2.4% 97.6% 97.6%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 51.24
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B27 of 49
Project No.
Testing Date
24TP14‐7 Sample No. 5 Depth (ft) 3.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY (CL): yelllow brown, moist
0.03 1.27 100.0%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 51.24 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.24
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 52.0 21.0 7.8 0.0262 92.7% 92.7%
5 47.0 21.0 8.6 0.0174 83.1% 83.1%
15 40.0 21.0 9.7 0.0107 69.6% 69.6%
30 36.0 21.0 10.4 0.0078 61.8% 61.8%
60 32.0 21.0 11.1 0.0057 54.1% 54.1%
90 30.0 21.0 11.4 0.0047 50.2% 50.2%
120 29.0 21.0 11.5 0.0041 48.3% 48.3%
240 26.0 21.0 12.0 0.0030 42.5% 42.5%
480 25.0 21.0 12.2 0.0021 40.6% 40.6%
1440 20.0 20.0 13.0 0.0013 30.9% 30.9%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B28 of 49
Project No.
Testing Date
24TP14‐11 Sample No. 8 Depth (ft) 2.5
Soil Description
Tray ID ‐‐ Air‐Dry Soil Mass (g) 53.32 53.32
Sieve No. Size, mm Mass Retained (g) % Retained
Combineed %
Passing
3 in 76.2 0.0% 100.0%
2 in * 50.8 0.0% 100.0%
1 in * 25.4 0.0% 100.0%
3/4 in * 19.1 0.0% 100.0%
1/2 in * 12.7 0.0% 100.0%
3/8 in * 9.50 0.0% 100.0%
No. 4 * 4.75 0.00 0.0% 100.0%
53.32 Sieve Continuity 100.0%
0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 53.32
Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 Corrected Dry Mass (g) 53.32 Sieve No. Size, mm Mass Retained (g) % Passing
Combined %
Passing
No. 10 2.00 0.00 100.0% 100.0%
51.24 Post Wash ID 103
Dry Mass Post Wash
(g) 10.00
Sieve No. Size, mm Mass Retained (g) Cum. Ret. (g) % Retained % Passing Combined %
Passing
1.06 1.06 2.1% 97.9% 97.9%
2.44 3.50 6.8% 93.2% 93.2%
3.42 6.92 13.5% 86.5% 86.5%
1.87 8.79 17.2% 82.8% 82.8%
1.10 9.89 19.3% 80.7% 80.7%
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
0.00 Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY with sand (CL): yelllow brown, moist
GRAVEL GRADING
Corrected Dry Mass (g)
Cumulative Retained (g)
Mass of Air‐Dried Soil (g)
0.00 0.00
0.00 0.00
0.00 0.00
Pan 53.32
WATER CONTENT OF MINUS #4 = #4 BY #10 GRADING
% Retained
0.0%
Pan Split Minus #10 for Hydrometer Test (152H)
#16 BY #200 GRADING
B29 of 49
Project No.
Testing Date
24TP14‐11 Sample No. 8 Depth (ft) 2.5
Soil Description
DEPARTMENT OF CIVIL AND ENVIRONMENTAL ENGINEERING
Hydrometer Analysis
Test Method: ASTM D422, D2487
Project Name SM Wastwater Treatment Plant 223‐184
Tested By NJD 4/18/2024
SPECIMEN ID AND CLASSIFICATION
Boring No.
Lean CLAY with sand (CL): yelllow brown, moist
0.04 9.93 100.7%
HYDROSCOPIC WATER CONTENT = 0.0%
Dish ID ‐‐ Moist Soil + Dish (g) 1.00 Mass of Air‐Dried Soil (g) 51.24 Dish Mass (g) 0.00 Dry Soil + Dish (g) 1.00 51.24
Composite Correction 4
Time (min)
Hydro.
Reading Temperature (ᵒC)
Effective
Depth
Diameter
(mm) % Passing
Combined %
Passing
2 47.0 21.0 8.6 0.0275 83.1% 83.1%
5 44.0 21.0 9.1 0.0179 77.3% 77.3%
15 42.0 21.0 9.4 0.0105 73.4% 73.4%
30 40.0 21.0 9.7 0.0076 69.6% 69.6%
60 37.0 21.0 10.2 0.0055 63.8% 63.8%
90 36.0 21.0 10.4 0.0045 61.8% 61.8%
120 34.0 21.0 10.7 0.0040 58.0% 58.0%
240 31.0 21.0 11.2 0.0029 52.2% 52.2%
480 28.0 21.0 11.7 0.0021 46.4% 46.4%
1440 22.0 20.0 12.7 0.0013 34.8% 34.8%
HYDROMETER
Corrected Dry Mass (g)
Pan Sieve Continuity
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
100 10 1 0.1 0.01 0.001
% Passing
Particle Diameter (mm)
Gradation Curve
B30 of 49
0 10
20 30
40 50
60 70
80 0 10 20 30 40 50 60 70 80 90 100 110
LIQUID LIMIT, LL
ML or OL
MH or OH
CL or OL
CH or OH
ATTERBERG LIMITS
PLASTICITY INDEX, PI
CL-ML
"A" LINE
31 26
24 21
24TP06-01
24TP06-07
24TP06-09
24TP11-05
Boring
Number
MC
(%)
8 8
2 3
23 18
22 18
4.0 3.0
3.0 5.0
1 5
6 9
Sample ID Depth
(ft) PL
30 22
29 28
Test
Symbol
Fines
(%) LL PI Classification
SILT (ML)
SILTY CLAY (CL-ML)
SANDY SILT (ML)
SANDY SILT (ML)
--
--
--
--
YEH ATTERBERG 223-184 LOGS AND LAB.GPJ CALIFORNIA YEH LIBRARY (YEH V4 JANUARY 2024).GLB 10/1/24 SHEET
1 of 1
PROJECT NO.
223-184
PROJECT MANAGER
J. King
PREPARED BY
R. Hooke
CHECKED BY
J. King
REVISION DATE
10-1-24
PROJECT NAME
Santa Maria WWTP
B31 of 49
CTL Number: Date: 4/19/2024
Client Name: By: RU
24TP2-04
20 Gray Organic
SILT w/ Sand
& Gravel
75.17 131.42128.71114.74
5.1 73.926.1
Note:
Moisture Content (%)
Organic Material (%)
ASTM provides no guidelines for including information about the organic content of a sample in the description when the wet/dry liquid limit data is not available. CTL developed the following guidelines to fill this gap:
Ash Content (%)
0-5%: The organics are either not mentioned or mentioned as being "trace". 5-15%: The soil is considered as inorganic and is classified, as per ASTM 2487, with "with organics" included in the description. 15-50%: The soil is considered as organic and is described, per ASTM 2487. > 50%: The soil is described as "Peat".
SMWWTP Ponds
Project Number: 223-184
687-219
Yeh and Associates
Furnace Dry wt. (440oC) (g)
Dish Number
Dish weight (g)
Soil, Org, Dish & H2O (g)
Project Name:
Visual Description
Boring
Sample
Depth (ft)
Oven Dry wt (110oC) (g)
Organic Content Test
ASTM D 2974-20 (Method A - 440 oC)
B32 of 49
CTL Number: Date: 6/3/2024
Client Name: By: RU
24TP4-01 24TP4-01 24TP4-02 24TP6-06 24TP8-01
10 11 12 7 16
03304
Gray Peat Yellowish
Brown Silty
SAND w/
Gravel
Yellowish
Brown Silty
SAND w/
Gravel
Gray Organic
Clay
Yellowish
Brown Silty
SAND w/
Gravel
77.02 75.77 74.33 80.20 74.90
110.73 266.23 260.71 99.06 270.23107.00 238.47 233.31 98.30 254.65
90.06 236.99 232.64 92.75 253.62
12.4 17.1 17.2 4.2 8.7
43.5 99.1 99.6 69.3 99.456.5 0.9 0.4 30.7 0.6
Note:
Moisture Content (%)
Organic Material (%)
ASTM provides no guidelines for including information about the organic content of a sample in the description when the wet/dry liquid limit data is not available. CTL developed the following guidelines to fill this gap:
Ash Content (%)
0-5%: The organics are either not mentioned or mentioned as being "trace". 5-15%: The soil is considered as inorganic and is classified, as per ASTM 2487, with "with organics" included in the description. 15-50%: The soil is considered as organic and is described, per ASTM 2487. > 50%: The soil is described as "Peat".
SMWWTP-Ponds 4,6,8,11
Project Number: 223-184
687-224
Yeh & Associates
Furnace Dry wt. (440oC) (g)
Dish Number
Dish weight (g)
Soil, Org, Dish & H2O (g)
Project Name:
Visual Description
Boring
Sample
Depth (ft)
Oven Dry wt (110oC) (g)
Organic Content Test
ASTM D 2974-20 (Method A - 440 oC)
B33 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 8.2 6.7 1.4E-06
SAMPLE IMAGES
1.4 11.5 8.2 6.7 1.4E-06
6 7/11/24 151 23.2 1.4
1.4E-06
4 7/11/24 152 23.2 1.4 11.5 8.2 6.7 1.4E-06
6.7 1.4E-06
3 7/11/24 151 23.2 1.4 11.5 8.2 6.7
8.2 6.7 1.4E-06
2 7/11/24 152 23.2 1.4 11.5 8.2
μ, ksf io if kt, cm/s
1 7/11/24 151 23.2 1.4 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 151 23.2
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.87 0.87 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.3E-06
Deaired Tap-Water
Saturation, % 57% 85% Pipette Area, cm2 0.0314
Water Content, % 19.1% 28.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 86.6 86.6 Permeant
Mass, g 622.45 672.88
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
4" of poorly-graded SAND (SP with
1" of lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
20 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
58A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B34 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 18.5 17.5 2.5E-07
SAMPLE IMAGES
1.4 10.1 18.5 17.5 2.4E-07
6 7/11/24 240 22.8 1.4
2.5E-07
4 7/11/24 240 22.8 1.4 10.1 18.5 17.5 2.5E-07
17.5 2.5E-07
3 7/11/24 241 22.8 1.4 10.1 18.5 17.5
18.5 17.5 2.5E-07
2 7/11/24 238 22.8 1.4 10.1 18.5
μ, ksf io if kt, cm/s
1 7/11/24 237 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 242 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.57 0.57 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.3E-07
Deaired Tap-Water
Saturation, % 52% 85% Pipette Area, cm2 0.0314
Water Content, % 11.6% 18.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.1 103.1 Permeant
Mass, g 694.67 739.23
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY (CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
41A 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B35 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 1.2 1.2E-05
SAMPLE IMAGES
1.4 10.1 1.5 1.2 1.2E-05
6 7/9/24 2100 22.4 1.4
1.2E-05
4 7/9/24 1200 22.4 1.4 10.1 1.5 1.3 1.2E-05
1.3 1.2E-05
3 7/9/24 1200 22.4 1.4 10.1 1.5 1.3
1.5 1.3 1.2E-05
2 7/9/24 1200 22.4 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/9/24 1200 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 2100 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.63 0.63 kavg 20ºC, cm/s 1.1E-05
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 81% 99% Pipette Area, cm2 0.263
Water Content, % 19.4% 23.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.7 99.7 Permeant
Mass, g 719.19 746.00
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND with silt (SP-SM) with lean CLAY (CL) seams:
light brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E6-03
CLASSIFICATION
Sieve Size % Passing Other Parameters
47 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B36 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 8.2 6.2 2.7E-06
SAMPLE IMAGES
1.4 10.1 8.2 6.2 2.7E-06
6 7/11/24 111 22.8 1.4
2.7E-06
4 7/11/24 111 22.8 1.4 10.1 8.2 6.2 2.7E-06
6.2 2.7E-06
3 7/11/24 112 22.8 1.4 10.1 8.2 6.2
8.2 6.2 2.7E-06
2 7/11/24 111 22.8 1.4 10.1 8.2
μ, ksf io if kt, cm/s
1 7/11/24 112 22.8 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/11/24 111 22.8
Volume, in3 23.00 23.00
Height, in 5.00 5.00 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.64 0.64 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 2.5E-06
Deaired Tap-Water
Saturation, % 97% 88% Pipette Area, cm2 0.0314
Water Content, % 23.7% 21.8%
TEST SUMMARYSample Type MCA
Dry Density, pcf 98.9 98.9 Permeant
Mass, g 739.15 727.37
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Sandy lean CLAY CL): light brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B37 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.5 0.6 1.0E-02
SAMPLE IMAGES
1.4 10.1 1.5 0.6 1.0E-02
6 7/9/24 10 22.4 1.4
1.0E-02
4 7/9/24 20 22.4 1.4 10.1 1.8 0.3 1.0E-02
0.3 1.0E-02
3 7/9/24 20 22.4 1.4 10.1 1.8 0.3
1.8 0.3 1.0E-02
2 7/9/24 20 22.4 1.4 10.1 1.8
μ, ksf io if kt, cm/s
1 7/9/24 20 22.4 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/9/24 10 22.4
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.60 0.60 kavg 20ºC, cm/s 9.6E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 30% 96% Pipette Area, cm2 0.263
Water Content, % 7.1% 22.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 101.1 101.1 Permeant
Mass, g 653.72 746.42
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): light
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
25.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E14-02
CLASSIFICATION
Sieve Size % Passing Other Parameters
14 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B38 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP2-2
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit ---
2.00 #
4 (4.75mm) --- Plastic Limit ---
Poorly-graded SAND with silt (SP-SM): red yelllow with black staining, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 793.25 829.81
Water Content, % 20.4% 25.9%
TEST SUMMARYSample Type MCA
Dry Density, pcf 96.2 96.2 Permeant Deaired Tap-Water
Saturation, % 74% 95% Pipette Area, cm2 0.263
Void Ratio 0.73 0.73 kavg 20ºC, cm/s 1.9E-03
Diameter, in 2.42 2.42 Tested By ND
Height, in 5.67 5.67
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 26.09 26.09
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 60 19.5
μ, ksf io if kt, cm/s
1 4/16/24 60 19.5 0.6 11.5 1.1 0.5 1.7E-03
2 4/16/24 60 19.5 0.6 11.5 1.1
3 4/16/24 60 19.5 0.6 11.5
0.6 11.5 1.1 0.4 1.9E-03
0.4 1.9E-03
1.1 0.4
6 4/16/24 60 19.5 0.6
1.9E-03
4 4/16/24 60 19.5
11.5 1.1 0.4 1.9E-03
SAMPLE IMAGES
0.6 11.5 1.1 0.4 1.9E-03
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B39 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
TempAvg, ºC σ', ksf μ, ksf io REMARKS
Test Method: ASTM D5084 (Method C)
kt, cm/s
0.6 1.0 0.6
0.6 11.5 1.0 0.6
1.0 0.6
1.0 120
4/16/24
1.0 0.6 6.3E-04
6.3E-04
6.3E-04
if
SAMPLE IMAGES
5 4/16/24
0.6 19.3 0.6 11.5
19.3 0.6 11.5
6.3E-04
19.3 MCA
ND
120 0.6 11.5
6.3E-04
0.6 11.5 6.3E-04
120 0.6 11.5 1.0
4 120
19.3 2 4/16/24 120 19.3
4/16/24 19.3
PERMEATION DATA
Trial Date Time, sec
3 6 4/16/24 120
1 4/16/24
Volume, in3 25.99 25.99
kavg 20ºC, cm/s 6.4E-04
Area, in2 4.52 4.52
Diameter, in 2.40 2.40 Tested By TEST SUMMARY
Void Ratio 0.63
5.75 5.75
Dry Density, pcf 102.5 102.5 Deaired Tap-Water
Saturation, % 89% 100% 0.263
Water Content, % 20.8% 23.3% Sample Type
844.67 862.60
#
200 (0.075mm)
Mass, g
---
Silty SAND (SM): red yelllow with
black staining, moist
SAMPLE PROPERTIES
Intial Final
#
100 (0.150mm) ---
0.63 Permeant
Pipette Area, cm2
Height, in
---
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.67
--- Plastic Limit
% Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit ---
24TP2-4
CLASSIFICATION
Sieve Size
2.00 #
4 (4.75mm)
SAMPLE ID
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B40 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
10.1 1.8 0.3 9.7E-03
SAMPLE IMAGES
1.4 10.1 1.8 0.3 9.6E-03
6 7/10/24 20 22.5 1.4
9.7E-03
4 7/10/24 15 22.5 1.4 10.1 1.5 0.4 9.7E-03
0.4 9.7E-03
3 7/10/24 15 22.5 1.4 10.1 1.5 0.4
1.5 0.4 9.6E-03
2 7/10/24 15 22.5 1.4 10.1 1.5
μ, ksf io if kt, cm/s
1 7/10/24 15 22.5 1.4 10.1
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 7/10/24 20 22.5
Volume, in3 23.00 23.00
Height, in 5.00 5.00
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.61 0.61 kavg 20ºC, cm/s 9.1E-03
Diameter, in 2.42 2.42 Tested By GF
Deaired Tap-Water
Saturation, % 45% 90% Pipette Area, cm2 0.263
Water Content, % 10.6% 21.2%
TEST SUMMARYSample Type MCA
Dry Density, pcf 100.6 100.6 Permeant
Mass, g 671.69 736.09
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): gray
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
30.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24E4-01
CLASSIFICATION
Sieve Size % Passing Other Parameters
61 3/8-in. (9.5mm) --- Liquid Limit
Yeh and Associates
Project No. 223-184
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B41 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 9.5 7.7 1.2E-06
SAMPLE IMAGES
0.6 11.5 9.5 7.7 1.2E-06
6 5/29/24 156 21.2 0.6
1.2E-06
4 5/29/24 156 21.2 0.6 11.5 9.5 7.7 1.2E-06
7.7 1.2E-06
3 5/29/24 156 21.2 0.6 11.5 9.5 7.7
9.5 7.7 1.2E-06
2 5/29/24 156 21.2 0.6 11.5 9.5
μ, ksf io if kt, cm/s
1 5/29/24 158 21.2 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 156 21.2
Volume, in3 20.04 20.04
Height, in 4.36 4.36 Tested By GF
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.2E-06
Deaired Tap-Water
Saturation, % 96% 100% Pipette Area, cm2 0.0314
Water Content, % 30.3% 31.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.5 92.5 Permeant
Mass, g 633.97 640.95
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): olive brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.79
---
4 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-1
CLASSIFICATION
Sieve Size % Passing Other Parameters
1 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B42 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.4 0.3 1.3E-02
SAMPLE IMAGES
0.6 11.5 1.4 0.3 1.3E-02
6 5/31/24 15 21.8 0.6
1.3E-02
4 5/31/24 15 21.8 0.6 11.5 1.4 0.3 1.3E-02
0.3 1.4E-02
3 5/31/24 15 21.8 0.6 11.5 1.4 0.3
1.4 0.3 1.3E-02
2 5/31/24 15 21.8 0.6 11.5 1.4
μ, ksf io if kt, cm/s
1 5/31/24 15 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 15 21.8
Volume, in3 25.04 25.02
Height, in 5.44 5.44
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.56 0.56 kavg 20ºC, cm/s 1.3E-02
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 34% 95% Pipette Area, cm2 0.263
Water Content, % 7.4% 20.5%
TEST SUMMARYSample Type MCA
Dry Density, pcf 103.8 103.8 Permeant
Mass, g 732.71 821.82
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Poorly-graded SAND (SP): red
yellow, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
---
3.50 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-6
CLASSIFICATION
Sieve Size % Passing Other Parameters
3 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B43 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 15.5 14.2 5.5E-07
SAMPLE IMAGES
0.6 11.5 15.5 14.2 5.5E-07
6 5/31/24 200 21.8 0.6
5.6E-07
4 5/31/24 199 21.8 0.6 11.5 15.5 14.2 5.5E-07
14.2 5.7E-07
3 5/31/24 197 21.8 0.6 11.5 15.5 14.2
15.5 14.2 5.8E-07
2 5/31/24 194 21.8 0.6 11.5 15.5
μ, ksf io if kt, cm/s
1 5/31/24 188 21.8 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 199 21.8
Volume, in3 27.14 27.14
Height, in 6.00 6.00 Tested By GF
Area, in2 4.52 4.52
REMARKS
Test Method: ASTM D5084 (Method F)
Void Ratio 0.69 0.69 Annulus Area, cm2 0.7671
Diameter, in 2.40 2.40 kavg 20ºC, cm/s 5.4E-07
Deaired Tap-Water
Saturation, % 84% 96% Pipette Area, cm2 0.0314
Water Content, % 21.4% 24.6%
TEST SUMMARYSample Type MCA
Dry Density, pcf 99.8 99.8 Permeant
Mass, g 863.09 885.38
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Lean CLAY (CL): yellowish brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.7
---
3 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B44 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
11.5 1.8 1.0 7.1E-04
SAMPLE IMAGES
0.6 11.5 1.8 1.0 7.1E-04
6 5/31/24 90 21.9 0.6
7.1E-04
4 5/31/24 90 21.9 0.6 11.5 1.8 1.0 7.1E-04
1.0 7.0E-04
3 5/31/24 90 21.9 0.6 11.5 1.8 1.0
1.8 1.0 7.1E-04
2 5/31/24 90 21.9 0.6 11.5 1.8
μ, ksf io if kt, cm/s
1 5/31/24 90 21.9 0.6 11.5
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/31/24 90 21.9
Volume, in3 23.02 23.02
Height, in 5.01 5.01
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Void Ratio 0.78 0.78 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Deaired Tap-Water
Saturation, % 98% 100% Pipette Area, cm2 0.263
Water Content, % 29.1% 29.7%
TEST SUMMARYSample Type MCA
Dry Density, pcf 92.4 92.4 Permeant
Mass, g 720.97 724.54
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
SILT (ML): yewwlow brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.64
---
3.00 #
4 (4.75mm) --- Plastic Limit ---
SAMPLE ID
24TP6-9
CLASSIFICATION
Sieve Size % Passing Other Parameters
6 3/8-in. (9.5mm) --- Liquid Limit
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B45 of 49
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP11-5
CLASSIFICATION
Sieve Size % Passing Other Parameters
9 3/8-in. (9.5mm) --- Liquid Limit ---
5.00 #
4 (4.75mm) --- Plastic Limit ---
Sandy SILT (ML): brown, moist #
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.6
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 652.05 659.68
Water Content, % 28.4% 30.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 89.4 89.4 Permeant Deaired Tap-Water
Saturation, % 91% 96% Pipette Area, cm2 0.263
Void Ratio 0.82 0.82 kavg 20ºC, cm/s 6.8E-04
Diameter, in 2.42 2.42 Tested By ND
Height, in 4.70 4.70
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method C)
Volume, in3 21.64 21.64
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 5/29/24 180 21.2
μ, ksf io if kt, cm/s
1 5/29/24 180 21.2 0.6 11.5 1.3 0.4 6.9E-04
2 5/29/24 180 21.2 0.6 11.5 1.3
3 5/29/24 180 21.2 0.6 11.5
0.6 11.5 1.3 0.4 7.0E-04
0.4 7.0E-04
1.3 0.4
6 5/29/24 180 21.2 0.6
7.0E-04
4 5/29/24 180 21.2
11.5 1.3 0.4 7.0E-04
SAMPLE IMAGES
0.6 11.5 1.3 0.4 7.0E-04
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
Yeh and Associates
Project No. 223-184
B46 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-4
3 4
TempAvg, ºC
Sandy lean CLAY (CL): yelllow
brown, moist
5.26 4.52
23.80 24.2%
101.8
100%
0.66 kt σ', ksf μ, ksf , cm/s
Permeant
Pipette Area, cm2
kavg 20ºC, cm/s
Annulus Area, cm2
REMARKS
16.2 5.0E-07
5.1E-07
5.1E-07
16.2 16.2
5.1E-07
5.0E-07
0.6 if
16.2 16.2
16.2 0.6 11.5 17.6
17.6 17.6
11.5 11.5
11.5 17.6
17.6 Void Ratio
Diameter, in
Tested By ND
4.52 Test Method: ASTM D5084 (Method F)
2.40 5.26
23.80 772.64
0.6 0.6
0.6 11.5 5.1E-07
Date Time, sec
SAMPLE PROPERTIES
Intial Final
Mass, g
Water Content, %
Dry Density, pcf
Saturation, %
Height, in
Area, in2
Volume, in3
21.5%
101.8
5 4/16/24
188
4/16/24 191
Trial
4/16/24 190
189
6 20.3
4/16/24
3 20.3
20.3 20.3
4/16/24 190 20.3
SAMPLE IMAGES
2 1 4/16/24 192 17.6
PERMEATION DATA
io
4 20.3
0.6 11.5
#
100 (0.150mm)
Sample Type
#
200 (0.075mm)
---
---
TEST SUMMARY
MCA
Deaired Tap-Water
0.0314
5.0E-07
0.7671
89%
0.66 2.40
789.34
CLASSIFICATION
Sieve Size % Passing Other Parameters
3/8-in. (9.5mm) Liquid Limit ---
---
---
2.7 Plastic Limit
Plasticity Index #
16 (1.18mm)
#
30 (0.6mm)
---
--- #
4 (4.75mm)
---
---
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B47 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-7
CLASSIFICATION
Sieve Size % Passing Other Parameters
5 3/8-in. (9.5mm) --- Liquid Limit ---
3.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY (CL): yelllow brown,
moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.84
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 823.70 830.62
Water Content, % 32.2% 33.3%
TEST SUMMARYSample Type MCA
Dry Density, pcf 91.2 91.2 Permeant Deaired Tap-Water
Saturation, % 97% 100% Pipette Area, cm2 0.0314
Void Ratio 0.94 0.94 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.9E-07
Height, in 5.66 5.66 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 26.03 26.03
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/17/24 190 21.8
μ, ksf io if kt, cm/s
1 4/17/24 152 21.8 0.6 11.5 16.4 15.9 2.2E-07
2 4/17/24 162 21.8 0.6 11.5 16.4
3 4/17/24 188 21.8 0.6 11.5
0.6 11.5 16.4 15.9 1.8E-07
15.9 2.0E-07
16.4 15.9
6 4/17/24 189 21.8 0.6
1.8E-07
4 4/17/24 181 21.8
11.5 16.4 15.9 1.7E-07
SAMPLE IMAGES
0.6 11.5 16.4 15.9 1.7E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B48 of 49
Yeh and Associates
Project No. 223-184
Boring Number
Sample Number
Sample Depth, ft
Classification
Estimated Gs
SAMPLE ID
24TP14-11
CLASSIFICATION
Sieve Size % Passing Other Parameters
8 3/8-in. (9.5mm) --- Liquid Limit ---
2.5 #
4 (4.75mm) --- Plastic Limit ---
Lean CLAY with sand (CL): yelllow
brown, moist
#
16 (1.18mm) --- Plasticity Index ---
#
30 (0.6mm) --- 2.73
#
100 (0.150mm) ---
SAMPLE PROPERTIES
Intial Final #200 (0.075mm) ---
Mass, g 682.12 696.59
Water Content, % 29.2% 32.0%
TEST SUMMARYSample Type MCA
Dry Density, pcf 90.8 90.8 Permeant Deaired Tap-Water
Saturation, % 91% 100% Pipette Area, cm2 0.0314
Void Ratio 0.88 0.88 Annulus Area, cm2 0.7671
Diameter, in 2.42 2.42 kavg 20ºC, cm/s 1.8E-07
Height, in 4.82 4.82 Tested By ND
Area, in2 4.60 4.60
REMARKS
Test Method: ASTM D5084 (Method F)
Volume, in3 22.15 22.15
PERMEATION DATA
Trial Date Time, sec TempAvg, ºC σ', ksf
5 4/16/24 141 19.9
μ, ksf io if kt, cm/s
1 4/16/24 195 19.9 0.6 11.5 19.3 18.7 1.4E-07
2 4/16/24 162 19.9 0.6 11.5 19.3
3 4/16/24 140 19.9 0.6 11.5
0.6 11.5 19.3 18.7 2.1E-07
18.7 1.7E-07
19.3 18.7
6 4/16/24 148 19.9 0.6
2.0E-07
4 4/16/24 132 19.9
11.5 19.3 18.7 1.9E-07
SAMPLE IMAGES
0.6 11.5 19.3 18.7 2.0E-07
HYDRAULIC CONDUCTIVITY
Santa Maria Wastewater Treatment Plant
Black Road, Santa Maria, CA
B49 of 49
APPENDIX C – HISTORICAL AERIAL PHOTOS
The EDR Aerial Photo Decade Package
Santa Maria Waste Water Treatment Plant 601 Black Road Santa Maria, CA 93458 Inquiry Number: January 09, 2024 7536673.1 6 Armstrong Road, 4th floor
Shelton, CT 06484
Toll Free: 800.352.0050
www.edrnet.com
C1 of 18
2020 1"=875' Flight Year: 2020 USDA/NAIP
2016 1"=875' Flight Year: 2016 USDA/NAIP
2012 1"=875' Flight Year: 2012 USDA/NAIP
2009 1"=875' Flight Year: 2009 USDA/NAIP
2006 1"=875' Flight Year: 2006 USDA/NAIP
2002 1"=875' Flight Date: June 04, 2002 USGS
1994 1"=875' Acquisition Date: January 01, 1994 USGS/DOQQ 1981 1"=875' Flight Date: October 18, 1981 USDA
1978 1"=875' Flight Date: September 22, 1978 USGS
1975 1"=875' Flight Date: December 01, 1975 USGS
1967 1"=875' Flight Date: June 27, 1967 USGS
1960 1"=875' Flight Date: April 01, 1960 USGS
1954 1"=875' Flight Date: February 21, 1954 USDA
1949 1"=875' Flight Date: March 28, 1949 USDA
1943 1"=875' Flight Date: September 21, 1943 USDA
1938 1"=875' Flight Date: January 22, 1938 FAIR
EDR Aerial Photo Decade Package 01/09/24 Santa Maria Waste Water Treatment Plant Site Name: Client Name: Yeh and Associates 601 Black Road 391 Front Street,Suite D Santa Maria, CA 93458 Grover Beach, CA 93433 EDR Inquiry # 7536673.1 Contact: Luke Salemme Environmental Data Resources, Inc. (EDR) Aerial Photo Decade Package is a screening tool designed to assist environmental professionals in evaluating potential liability on a target property resulting from past activities. EDR’s professional researchers provide digitally reproduced historical aerial photographs, and when available, provide one photo per decade. Search Results: Year Scale Details Source
When delivered electronically by EDR, the aerial photo images included with this report are for ONE TIME USE ONLY. Further reproduction of these aerial photo images is prohibited without permission from EDR. For more information contact your EDR Account Executive. Disclaimer - Copyright and Trademark Notice Copyright 2024 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission.
EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, LLC or its affiliates. All other trademarks used herein are the property of their respective owners. 7536673 - 1 page 2 This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, LLC. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. This Report is provided on an “AS IS”, “AS AVAILABLE” basis. NO WARRANTY EXPRESS OR IMPLIED IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT.
ENVIRONMENTAL DATA RESOURCES, LLC AND ITS SUBSIDIARIES, AFFILIATES AND THIRD PARTY SUPPLIERS DISCLAIM ALL WARRANTIES, OF ANY
KIND OR NATURE, EXPRESS OR IMPLIED, ARISING OUT OF OR RELATED TO THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN
THIS REPORT, INCLUDING WITHOUT LIMITATION, ANY WARRANTIES REGARDING ACCURACY, QUALITY, CORRECTNESS, COMPLETENESS,
COMPREHENSIVENESS, SUITABILITY, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, TITLE, NON-INFRINGEMENT, MISAPPROPRIATION, OR OTHERWISE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, LLC OR ITS
SUBSIDIARIES, AFFILIATES OR THIRD PARTY SUPPLIERS BE LIABLE TO ANYONE FOR ANY DIRECT, INCIDENTAL, INDIRECT, SPECIAL,
CONSEQUENTIAL OR OTHER DAMAGES OF ANY TYPE OR KIND (INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS, LOSS OF USE, OR LOSS OF DATA), ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS REPORT OR ANY OF THE DATA AND INFORMATION PROVIDED IN THIS REPORT.
Any analyses, estimates, ratings, environmental risk levels, or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only an assessment performed by a qualified environmental professional can provide findings, opinions or conclusions regarding the environmental risk or conditions in, on or at any property.
C2 of 18
7536673.1 2020 = 875'
C3 of 18
7536673.1 2016 = 875'
C4 of 18
7536673.1 2012 = 875'
C5 of 18
7536673.1 2009 = 875'
C6 of 18
7536673.1 2006 = 875'
C7 of 18
7536673.1 2002 = 875'
C8 of 18
Subject boundary not shown because it
exceeds image extent or image is not
georeferenced.
7536673.1 1994 = 875'
C9 of 18
7536673.1 1981 = 875'
C10 of 18
7536673.1 1978 = 875'
C11 of 18
7536673.1 1975 = 875'
C12 of 18
7536673.1 1967 = 875'
C13 of 18
7536673.1 1960 = 875'
C14 of 18
7536673.1 1954 = 875'
C15 of 18
7536673.1 1949 = 875'
C16 of 18
7536673.1 1943 = 875'
C17 of 18
7536673.1 1938 = 875'
C18 of 18
APPENDIX D – PREVIOUS STUDIES AND PERTINENT DATA
D1 of 179
D2 of 179
D3 of 179
D4 of 179
D5 of 179
D6 of 179
D7 of 179
D8 of 179
D9 of 179
D10 of 179
D11 of 179
D12 of 179
D13 of 179
D14 of 179
D15 of 179
D16 of 179
D17 of 179
D18 of 179
D19 of 179
D20 of 179
D21 of 179
D22 of 179
D23 of 179
D24 of 179
D25 of 179
D26 of 179
D27 of 179
D28 of 179
D29 of 179
D30 of 179
D31 of 179
D32 of 179
D33 of 179
D34 of 179
D35 of 179
D36 of 179
D37 of 179
D38 of 179
D39 of 179
D40 of 179
D41 of 179
D42 of 179
D43 of 179
D44 of 179
D45 of 179
`
D46 of 179
`
D47 of 179
`
D48 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3045.053
Carollo Engineers
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:00 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D49 of 179
5 Poorly-graded SAND (SP): dense, brown, moist
Silty SAND (SM): medium dense, brown, moist
SILT (ML): medium stiff, brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
Poorly-graded SAND with gravel (SP): loose, brown,
moist, approximate 10" thick layer of well graded
sand with gravel (SW) in bottom of sampler
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 11 3
4 6
4 3
1 2
8 ALLUVIUM (Qal)
Silty SAND (SM): loose, light brown, moist, organics,
roots
93 (15)
20 (41)
7 (19)
35 97
106
110
103
(15)
94 4
94 9
100
106
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
A
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf B
5 6
7 8
9 p 2.0
SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-2a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D50 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
PLATE A-2b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
5 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- medium dense, light brown, increase in grain size
- dense, decrease in grain size
(44) 103
39 10
11 SAMPLERS
LIQUID
LIMIT, %
108
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-1
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 30' east of access road in
field west of Black Rd. Proposed primary
clarifier.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 50.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D51 of 179
108
108
37 1 3
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a A
3 4
5 6
SAMPLERS
3 18
7 8
ALLUVIUM (Qal)
Silty SAND (SM): medium dense, brown, dry to moist
- moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT (ML): medium stiff, brown, moist, orange
staining, gray mottling
- soft, with 4-inch layer of sandy silt (ML), wet
Poorly-graded SAND (SP): medium dense, brown,
moist
114
2 111
92 102
(29)
10 (9)
3 (38)
- dense
BACKFILLED WITH: Cuttings
% PASSING
#200 SIEVE
LIQUID
LIMIT, %
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
UNIT WET
WEIGHT, pcf
MATERIAL DESCRIPTION
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
LOG OF BORING NO. B-2
DRILLING DATE: August 31, 2006
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 25.5 ft
Carollo Engineers
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-3
SURFACE EL: 162.4 ft +/- (rel. MSL datum)
UNIT DRY
WEIGHT, pcf
Project No. 3045.053
SAMPLER
BLOW COUNT
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
SAMPLE NO.
Approximately 25' east of access road in
field west of Black Rd. Proposed primary
trickling filter.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
D52 of 179
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a - medium dense
Poorly-graded SAND (SP): very dense, light brown,
moist
- firmer drilling starting at approximately 32'
- SILT (ML) layer 2' thick
- brown
Poorly-graded SAND with silt (SP-SM): medium
dense, light brown, moist
Clayey SILT (ML): soft, brown, moist
- wet zone of soil between 15' and 17'
3 1
5 8
35 30
4 Clayey SAND (SC): loose, brown, moist
4 25
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
SILT (ML): medium stiff, brown, moist
29 107
6 (13)
(10)
101
103
29 (82)
18 (19)
116
79 3
97 112
5 95
ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 51.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
BACKFILLED WITH: Cuttings
2SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: August 31, 2006 SAMPLER BLOW COUNT
UNIT WET
WEIGHT, pcf
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-3
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
7 MATERIAL DESCRIPTION
SAMPLERS
9 D
6 C
5 4
B
8 172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
LIQUID
LIMIT, %
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
UNIT DRY
WEIGHT, pcf
A
PLATE A-4a
DEPTH TO WATER: Wet soil noted DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
D53 of 179
DEPTH TO WATER: Wet soil noted
MATERIAL DESCRIPTION
PLASTICITY
DEPTH, ft
INDEX, %
11 PLATE A-4b
6 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
UNDRAINED SHEAR
STRENGTH, Su, ksf
98 Silty SAND (SM): medium dense, light brown, moist
Poorly-graded SAND (SP): medium dense, brown,
moist
93 22
SAMPLERS
10 (30)
LIQUID
LIMIT, %
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
UNIT DRY
WEIGHT, pcf
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
% PASSING
#200 SIEVE
SURFACE EL: 172.2 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-3
Approximately 400' west of main entrance to
plant. Proposed septage receiving station.
SAMPLE NO.
130
128
126
124
122
120
118
116
114
112
110
108
106
104
102
100
98 96
94 92
90 UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: August 31, 2006 ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft MATERIAL SYMBOL
D54 of 179
6 Poorly-graded SAND (SP) medium dense, brown,
moist
Silty SAND (SM): medium dense, brown, moist, fine
Poorly-graded SAND (SP): medium dense, brown,
moist
- brown, moist occasional orange staining, sandy
SILT (ML) layer approximately 3" thick in top of
sampler
- medium dense, light brown
- very loose
ALLUVIUM (Qal)
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
ARTIFICIAL FILL (af)
3" asphalt concrete over 3" aggregate base
2 5
BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
9 6
8 5
1 A
2 104
(1)
13 (41)
26 (16)
28 (69)
117
103
108
113
- dense
100
98 111
4 (26)
3 MATERIAL
SYMBOL
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 40.5 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-4
Southwest corner of Plant. Proposed
percolation pond pump station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. PLASTICITY INDEX, % B
DEPTH, ft
DEPTH TO WATER: Not Encountered
PLATE A-5
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT WET
WEIGHT, pcf
D55 of 179
ALLUVIUM (Qal)
Poorly-graded SAND (SP): medium dense, brown,
moist, occasional gravel rounded (1/8" max)
(26)
- medium dense, light brown
Poorly graded SAND (SP): dense, brown, moist
Poorly-graded SAND with silt (SP-SM) medium dense,
brown, moist
- 10" thick well graded SAND (SW) layer
Poorly-graded SAND with silt (SP-SM) medium dense,
light brown, moist
SILT with sand (ML): soft, brown, moist, approximately
2" of lean clay in bottom of sampler, wet zone in
middle approximately 4" of sampler
8 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a ARTIFICIAL FILL (af)
gravel and filter fabric
12 5
7 6
6 1
A
2 - loose to medium dense
19 (52)
22 116
108
108
120
22 (36)
4 4
(15)
27 115
101
102
108
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. MATERIAL SYMBOL ELEVATION, ft WATER CONTENT, % LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
3 SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard UNDRAINED SHEAR STRENGTH, Su, ksf 5 6
C
7 8
9 SAMPLERS
MATERIAL DESCRIPTION
BACKFILLED WITH: Cuttings
B
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
LIQUID
LIMIT, %
PLASTICITY
UNIT DRY
INDEX, %
WEIGHT, pcf
PLATE A-6a
DEPTH TO WATER: Not Encountered DEPTH, ft 2
4 6
8 10
12 14
16 18
20 22
24 26
28 30
32 34
36 38
40 D56 of 179
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
114
112
110
108
106
104
102
100
98 96
94 92
90 88
86 84
82 80
78 76
74 PLATE A-6b
MATERIAL DESCRIPTION
UNIT DRY
WEIGHT, pcf
10 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a DEPTH TO WATER: Not Encountered
- 2" thick interbed of Silty SAND (SM) in middle of
sampler
- dense, occasional gravel subrounded (1/4" max)
(34) 96
36 10
11 SAMPLERS
LIQUID
LIMIT, %
105
SAMPLER
BLOW COUNT
UNIT WET
WEIGHT, pcf
44 46
48 50
52 54
56 58
60 62
64 66
68 70
72 74
76 78
80 82
SURFACE EL: 157.4 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-5
SAMPLE NO.
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Approximately 75' west of structure , 30 '
east of plant access rd. Proposed digester.
ELEVATION, ft
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
MATERIAL
SYMBOL
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 51.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: August 31, 2006
BACKFILLED WITH: Cuttings
D57 of 179
112
1 5
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 5 6
p 1.5
SAMPLERS
MATERIAL DESCRIPTION
22 21
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
SILT with sand (ML): soft to medium stiff, brown,
moist
SILT (ML): medium stiff to stiff, brown, moist, orange
staining, gray mottling
- very soft to soft, wet
Poorly-graded SAND with silt (SP-SM): medium
dense, brown, moist
108
100 95
89 92
5 (11)
6 (12)
2 (16)
4 ELEVATION, ft
% PASSING
#200 SIEVE
COMPLETION DEPTH: 26.0 ft
LOCATION:
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
WATER
CONTENT, %
MATERIAL
SYMBOL
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time. 2 BACKFILLED WITH: Cuttings SAMPLE NO.
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
DRILLING DATE: October 20, 2006 SAMPLER BLOW COUNT
Approximately 350' west of main entrance to
plant. Proposed septage receiving station.
LOG OF BORING NO. B-6
SURFACE EL: 172.5 ft +/- (rel. MSL datum)
172
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT DRY
WEIGHT, pcf
LIQUID
LIMIT, %
DEPTH TO WATER: Wet soil noted
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
UNIT WET
WEIGHT, pcf
PLATE A-7
D58 of 179
7 - dense
Poorly-graded SAND (SP): medium dense, light
brown, moist
- 5-inch thick layer of poorly-graded sand (SP) in
middle of sampler
- silt with sand (ML) in bottom of sampler, wet zone at
19.5'
SILT (ML): soft, brown, moist, orange staining, gray
mottling
SILT with sand (ML): medium stiff, brown, moist
- very loose
p 0.7
38 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 1 2
3 4
A
5 6
7 8
(51)
ALLUVIUM (Qal)
Silty SAND (SM): loose, brown, moist
(12)
116
105
31 (17)
5 (5)
4 4
(7)
98 84
SAMPLERS
ELEVATION, ft
WATER
CONTENT, %
LOCATION:
COMPLETION DEPTH: 41.0 ft
% PASSING
#200 SIEVE
DRILLING DATE: October 20, 2006
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
9 MATERIAL
SYMBOL
SURFACE EL: 172 ft +/- (rel. MSL datum)
LOG OF BORING NO. B-7
Approximately 400' west of main entrance to
plant. Proposed clarifier at Septage
Receiving Station.
SAMPLE NO.
SAMPLER
BLOW COUNT
Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
MATERIAL DESCRIPTION
PLASTICITY
INDEX, %
UNDRAINED SHEAR
STRENGTH, Su, ksf
DEPTH, ft
DEPTH TO WATER: Wet soil noted
PLATE A-8
UNIT DRY
WEIGHT, pcf
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
LIQUID
LIMIT, %
170
168
166
164
162
160
158
156
154
152
150
148
146
144
142
140
138
136
134
132
UNIT WET
WEIGHT, pcf
BACKFILLED WITH: Cuttings
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
D59 of 179
100
92 81
2 Poorly-graded SAND (SP): medium dense, brown,
moist
Well-graded SAND (SW): medium dense, brown,
moist
SILT (ML): soft, brown, moist, wet in middle 8 inches
of sampler
- increase in grain size
- medium dense
Poorly-graded SAND with silt (SP-SM): loose, brown,
moist
3 BORING LOG VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:02 a 106
107
87 6
(42)
(9)
(27)
18 (41)
14 (13)
7 (12)
ALLUVIUM (Qal)
Silty SAND (SM): loose, dark brown, moist
19 5
Sandy SILT (ML): medium stiff, brown, moist
13 12
11 10
9 8
SAMPLERS
6 4
3 2
1 7
7 DEPTH TO WATER: Wet soil noted
ARTIFICIAL FILL (af)
gravel and filter fabric
11 6
12 16
Silty CLAY (CL-ML): very soft to soft, brown, moist, 29 p 0.5 orange staining
DEPTH, ft
UNDRAINED SHEAR
STRENGTH, Su, ksf
PLASTICITY
INDEX, %
MATERIAL DESCRIPTION
7 PLATE A-9
WATER
ELEVATION, ft
CONTENT, %
MATERIAL
SYMBOL
COMPLETION DEPTH: 41.0 ft
BACKFILLED WITH: Cuttings
UNIT WET
WEIGHT, pcf
156
154
152
150
148
146
144
142
140
138
136
134
132
130
128
126
124
122
120
118
116
UNIT DRY
LIQUID
LIMIT, %
WEIGHT, pcf
The log and data presented are a simplification of actual conditions encountered at the time of drilling at the drilled location. Subsurface conditions may differ at other locations and with the passage of time.
LOG OF BORING NO. B-8
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
Project No. 3045.053
SAMPLER
BLOW COUNT
LOCATION: Approximately 600' west of Black Road.
Proposed Primary Trickling Filter.
SURFACE EL: 156.8 ft +/- (rel. MSL datum)
DRILLING METHOD: 8-inch-dia. Hollow Stem Auger
HAMMER TYPE: Automatic Trip
DRILLED BY: S/G Drilling Company
LOGGED BY: C Stoehr
CHECKED BY: J Blanchard
DRILLING DATE: October 20, 2006
% PASSING
#200 SIEVE
SAMPLE NO.
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 40
D60 of 179
100 10 1 0.1 0.01 0.001
50 100
90 80
60 40
30 20
10 0
70 4
4.1 2.7
1.5 1.5
Cc Cu
(depth,ft)
1.53 3/4 3/8 40 100
CLASSIFICATION
US STD SIEVE SIZE
19.0 4.0
4.0 NUMBERS
US STD SIEVE SIZE
INCHES
(location)
B-5
B-3
B-2
Poorly-graded SAND with silt (SP-SM)
Silty SAND (SM)
Poorly-graded SAND with silt (SP-SM)
200
SILT or CLAY
SAND
GRAIN SIZE CURVES
10 LEGEND
20 HYDROMETER ANALYSIS
GRAIN SIZE CURVES VENTURA (F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ) 10/11/06 01:03 p-sz Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Carollo Engineers
PLATE B-1
GRAVEL
GRAIN SIZE IN MILLIMETERS
Coarse Medium Fine
PERCENT FINER BY WEIGHT
Fine Coarse
Project No. 3045.053
D61 of 179
010 20 30 40 50 60 70 80 90 100
20 10
30 40
50 60
70 80
90 100
0 LIMIT(LL)
PLASTIC
LIMIT(PL)
Clayey SILT (ML)
Silty CLAY (CL-ML)
depth, ft
ATTERBERG LIMITS TEST RESULTS
PLASTICITY INDEX (PI)
INDEX (PI)
CL-ML
LIQUID LIMIT (LL)
PLASTICITY CHART
PLATE B-2
25 22
5 7
PLASTICITY CHART VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 10:04 a Project No. 3045.053
Carollo Engineers
CLASSIFICATION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
19.0 4.5
B-3
LIQUID
PLASTICITY
30 29
CH or OH
CL or OL
ML or OL
MH or OH
LEGEND
location
B-8
D62 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 35
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
3 94
Remold
MATERIAL DESCRIPTION
B-1
6 DIRECT SHEAR TEST RESULTS
PLATE B-3a
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D63 of 179
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5
2.0 0.0
0.5 1.5
2.5 3.0
3.5 4.0
1.0 LOCATION
6.0 SHEAR STRESS, ksf
NORMAL STRESS, ksf
0.0 33
UNIT DRY WEIGHT, pcf
Poorly-graded SAND with silt (SP-SM)
SAMPLE CONDITION
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
DEPTH, ft
MOISTURE CONTENT, %
COHESION, ksf
ANGLE OF INTERNAL FRICTION, deg
8 100
Ring Sample
MATERIAL DESCRIPTION
B-4
19 DIRECT SHEAR TEST RESULTS
PLATE B-3b
DIRECT SHEAR PLOT VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 10/11/06 01:04 p Project No. 3045.053
Carollo Engineers
D64 of 179
OPTIMUM WATER
CONTENT, %
MOISTURE CONTENT, %
UNIT DRY WEIGHT, pcf
LEGEND MAXIMUM UNIT
DRY WEIGHT, pcf
Test Method: ASTM D1557
25 COMPACTION TEST RESULTS
(location)
Poorly-graded SAND with silt (SP-SM)
135
100
105
110
115
120
5 10 15 20
125
130
0 CLASSIFICATION
116.0
PLATE B-4
depth, ft
B-1
COMPACTION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/10/06 09:42 a Project No. 3045.053
Carollo Engineers
6.0 ZERO AIR VOIDS CURVES
11.0 Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
(Gs = 2.65 to 2.75)
D65 of 179
SAMPLE CONDITION
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
Project No. 3045.053
B-2
92 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
9 PLATE B-5a
CONSOLIDATION TEST RESULTS
Poorly-graded SAND with silt (SP-SM)
18 Carollo Engineers
8 10
12 14
16 18
20 CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p 2 0.1 1 10
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
6 4
0 100
D66 of 179
16 18
20 10
14 12
0 2
4 6
8 0.1
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
PLATE B-5b
1 10 100
MATERIAL DESCRIPTION
DEPTH, ft
Clayey SAND (SC)
INITIAL MOISTURE CONTENT, %
CONSOLIDATION TEST RESULTS
35 B-3
SAMPLE CONDITION
79 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
14 LOCATION
D67 of 179
16 18
20 MATERIAL DESCRIPTION
10 0.1 1 10 100
14 12
0 2
4 6
8 38
DEPTH, ft
LOCATION
Project No. 3045.053
B-7
SAMPLE CONDITION
84 VERTICAL EFFECTIVE PRESSURE, ksf
STRAIN, %
UNIT DRY WEIGHT, pcf
19.5 PLATE B-5c
CONSOLIDATION TEST RESULTS
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
WATER ADDED
INITIAL MOISTURE CONTENT, %
SILT (ML)
D68 of 179
14 16
18 20
8 0.1 1 10 100
12 10
0 2
4 6
UNIT DRY WEIGHT, pcf
DEPTH, ft
LOCATION
INITIAL MOISTURE CONTENT, %
MATERIAL DESCRIPTION
16 B-8
SAMPLE CONDITION
92 STRAIN, %
7 PLATE B-5d
CONSOLIDATION TEST RESULTS
Sandy SILT (ML)
CONSOLIDATION TEST VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3045.053.GPJ 11/1/06 02:24 p Project No. 3045.053
Carollo Engineers
Santa Maria Wastewater Treatment Plant Upgrades - Phase II Santa Maria, California
Undisturbed
VERTICAL EFFECTIVE PRESSURE, ksf
WATER ADDED
D69 of 179
Carollo Engineers
Project No. 3045.053
SAND EQUIVALENT TEST RESULTS
Santa Maria Wastewater Treatment Plant Upgrades-Phase II Santa Maria, California
PLATE B-6
SAND EQUIVALENT TEST RESULTS
Sample
Number
Depth
(ft)
Clay Readings
(inches)
Sand Readings
(inches)
Sand
Equivalent
(SE)
Soil Type
B-1 9 5.5 3.4 62 Poorly-graded SAND
with silt (SP-SM)
B-5 4 9.0 2.7 30 Poorly-graded SAND
(SP)
B-6 4 5.3 2.9 55 Poorly-graded SAND
with silt (SP-SM)
Test Method: ASTM D2419
D70 of 179
D71 of 179
D72 of 179
D73 of 179
D74 of 179
D75 of 179
D76 of 179
D77 of 179
D78 of 179
D79 of 179
D80 of 179
D81 of 179
D82 of 179
D83 of 179
D84 of 179
D85 of 179
D86 of 179
D87 of 179
D88 of 179
D89 of 179
D90 of 179
D91 of 179
D92 of 179
D93 of 179
D94 of 179
D95 of 179
D96 of 179
D97 of 179
D98 of 179
D99 of 179
D100 of 179
!
"
# $ %
! " # $
% " %" & ' ( %
+ , -
. , -
-
+
/
0 .
1 2
2 3
1 .
3 3 , 1
, -
0 , -
0 , 1
. , 1
0 , -
. , -
+ , -
0 , -
+ , -
0 , -
. , -
1 , -
. , -
1 , -
/ , -
. , 1
/ , -
. , -
1 , -
0 , 1
/ , -
0 , -
/ , -
0 , -
+ , -
0 , 1
( 4
A #
3 3
4 5 :
3 3
4 )
3 9
>
?
3 3
4 )
3 9 ,
: @ >
?
+ , -
.
. , -
: @
5 )
3 9 ,
@ =
D101 of 179
SANDSTONE
Paving and/or Base Materials
Silty SAND (SM)
Silty CLAY (CL-ML)
MATERIAL DESCRIPTION
C
O
A
R
S
E
G
R
A
I
N
E
D
Poorly graded SAND (SP)
4 11
SYMBOL
PLATE A-1
Thin-walled Tube, pushed
R
O
C
K
F
I
N
E
G
R
A
I
N
E
D
3 CONGLOMERATE
Poorly graded GRAVEL (GP)
MUDSTONE
5 9
7 ANDESITE BRECCIA
Hand Auger Sample
SAMPLE NO.
MATERIAL
Fat CLAY (CH)
Well graded SAND (SW)
SILTSTONE
10 Project No. 3019.008
City of Santa Maria
Sonic Soil Core Sample
6 (25)
13 Symbol for:
No Sample Recovered
BASALT
Lexan Sample
Pitcher Sample
Vibracore Sample
CA Liner Sampler, driven
25 CA Liner Sampler, Bagged
KEY TO TERMS & SYMBOLS USED ON LOGS
1 SPT Sampler, driven
11 3 CA Liner Sampler, disturbed
(unless otherwise noted in report text) are as follows:
Sloped line in symbol column indicates
transitional boundary
General Notes
Soil Texture Symbol
Samplers and sampler dimensions
m = Miniature Vane
12 -12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44
-46
-48
2 SURFACE EL: Using local, MSL, MLLW or other datum
Water Level Symbols
Length of sample symbol approximates
recovery length
Strength Legend
Classification of Soils per ASTM D2487
or D2488
Geologic Formation noted in bold font at
the top of interpreted interval
Blow counts for California Liner Sampler
shown in ( )
25 Blows/ft Description
REC"/DRIVE"
2-3/8" ID, 3" OD
2-3/8" ID, 3" OD
1-3/8" ID, 2" OD
Rock Quality Designation (RQD) is the
sum of recovered core pieces greater
than 4 inches divided by the length of
the cored interval.
25 blows drove sampler 12" after
initial 6" of seating
86/11"
50/6"
After driving sampler the initial 6"
of seating, 36 blows drove
sampler through the second 6"
interval, and 50 blows drove the
sampler 5" into the third interval
50 blows drove sampler 6" after
initial 6" of seating
Ref/3" 50 blows drove sampler 3" during
initial 6" seating interval
ELEVATION, ft
6 18"/
30"
8 DEPTH, ft
20"/
24"
30"/
30"
BORING LOG KEY VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/27/08 02:56 p 10 12
CME Core Sample
4 t = Torvane
20"/
24"
Lean CLAY (CL)
Bulk Bag Sample (from cuttings)
Final ground water level
Seepages encountered
Initial or perched water level
u = Unconsolidated Undrained Triaxial
Q = Unconfined Compression
p = Pocket Penetrometer
Sampler Driving Resistance
CLAYSTONE
LOCATION:
(25)
(25)
Elastic SILT (MH)
(25)
Silty, Clayey SAND (SC-SM)
2-7/8" ID, 3" OD
2 4
6 8
10 12
14 16
18 20
22 24
26 28
30 32
34 36
38 BLOW COUNT /
Well graded GRAVEL (GW)
The drill hole location referencing local
landmarks or coordinates
Clayey SAND (SC)
SAMPLES
7 8
1 9
Number of blows with 140 lb. hammer, falling
30" to drive sampler 1 ft. after seating
sampler 6"; for example,
13 5
2 SILT (ML)
D102 of 179
10 LIMIT, %
CONTENT, %
DEPTH, ft
8 % PASSING
PLATE A-2
UNIT DRY
WEIGHT, pcf
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, reddish brown to
greenish brown, moist
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, trace fine rounded gravel
UNIT WET
WEIGHT, pcf
LIQUID
INDEX, %
SAMPLE NO.
WATER
COMPLETION DEPTH: 7.0 ft ELEVATION, +/- MSL ELEVATION, ft
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 DEPTH TO WATER: 5.5 ft
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Qa2
Project No. 3019.008
2 143
6 4
Disturbed Soils
141SYMBOL
145
147
149
151
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
PLASTICITY
0 Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, moist to wet, water perched at base of unit, strong organic odor
TD = 7.0 ft
MATERIAL
#200 SIEVE
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
TEST PIT GRAPHICAL REPRESENTATION
LOG OF TEST PIT NO. T-1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOCATION: East Side of Perc Pond No. 1
EXCAVATION METHOD: Backhoe
DEPTH, ft
SAMPLES
SAMPLER
UNDRAINED
SHEAR
STRENGTH,Su, ksf
Black Sand
CONTRACTOR: City of Santa Maria
LOG OF TEST HOLE NO. T-1
CHECKED BY: J Blanchard
LOGGED BY: GD Eckrich
EXCAVATION DATE: June 2, 2008
150
148
146
144
142
140
138
BLOWCOUNT
D103 of 179
EXCAVATION DATE: June 2, 2008
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-2
150
148
146
144
142
140
138
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SYMBOL
SAMPLES
SAMPLER
0 Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
2 PLATE A-3
UNIT WET
WEIGHT, pcf
ELEVATION, +/- MSL
INDEX, %
SAMPLE NO.
2 4
6 8
10 12
14 COMPLETION DEPTH: 2.5 ft
LIQUID
DEPTH TO WATER: Not Encountered
Black Sand
DEPTH, ft
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-2
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time. 145 6
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p Project No. 3019.008
City of Santa Maria
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California 151
147
149
8 4
TD = 2.0 ft
Disturbed Soils
141
143
10 D104 of 179
0 EXCAVATION DATE: June 2, 2008
LOGGED BY: GD Eckrich
CHECKED BY: J Blanchard
EXCAVATION METHOD: Backhoe
CONTRACTOR: City of Santa Maria
BLOWCOUNT
UNDRAINED
SHEAR
STRENGTH,Su, ksf
DEPTH, ft
MATERIAL
SAMPLES
SAMPLER
2 4
6 8
10 Black Sand
SYMBOL
Disturbed Soils
Silty SAND (SM): loose to medium dense, greenish brown, moist, occasional fine rounded gravel
WATER
UNIT DRY
WEIGHT, pcf
ELEVATION, ft
MATERIAL DESCRIPTION
150
148
146
144
142
140
138
TEST PIT LOG WITH LAB SUMS VENTURA F:\FUGRO SLO GEOTECH DOCUMENTS\GINT\GINT PROJECTS\3019.008.GPJ 6/30/08 12:25 p ELEVATION, +/- MSL SAMPLE NO. 2 4
6 8
10 12
14 COMPLETION DEPTH: 3.0 ft
TD = 3.0 ft
151
149
147
145
143
141
INDEX, %
LIQUID
PLATE A-4
CONTENT, %
% PASSING
LIMIT, %
#200 SIEVE
PLASTICITY
LOG OF TEST HOLE NO. T-3
UNIT WET
WEIGHT, pcf
DEPTH TO WATER: Not Encountered
LOCATION: East Side of Perc Pond No. 1
SURFACE EL: 151.0 ft +/- (rel. datum)
LOG OF TEST PIT NO. T-3
TEST PIT GRAPHICAL REPRESENTATION
The log and data presented are a simplification of actual conditions encountered at the time of exploring at the explored location. Subsurface conditions may differ at other locations and with the passage of time.
Disturbed Soils
Percolation Pond No. 1
Santa Maria Wastewater Treatment Facility, Santa Maria, California City of Santa Maria
Project No. 3019.008
DEPTH, ft
Black Sand
Poorly-graded SAND with silt (SP-SM): medium dense,
black, strong organic odor
D105 of 179
MATERIAL DESCRIPTION
2 4
6 8
10 12
14 COMPLETION DEPTH: 9.0 ft ELEVATION, ft
UNIT DRY
INDEX, %
WEIGHT, pcf
WATER
PLASTICITY
ELEVATION, +/- MSL
LIMIT, %
% PASSING
ALLUVIUM (Qa2)
Lean CLAY (CL): stiff to very stiff, greenish brown, moist, fissured
SAMPLE NO.
PLATE A-5
UNIT WET
WEIGHT, pcf
LIQUID
2 10
1 ALLUVIUM (Qa3)
Poorly-graded SAND with silt (SP-SM): light gray to dark gray, wet
Disturbed Soils
Poorly-graded SAND with silt (SP-SM): loose to medium
dense, greenish brown, moist, trace fine rounded gravel 149
ALLUVIUM (Qa1)
Poorly-graded SAND with silt (SP-SM): medium dense,
reddish brown to greenish brown, moist to wet, water
perched at base of unit, oxidation mottling, lenses of Oil SAND
TD = 9.0 ft
Qa3
Qa2
Qa1
8 151
141
143
145
147
CONTENT, %
Disturbed Soils