I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

5. View of irrigation ditch facing east. May 9, 2024. 6. View of irrigation ditch facing east. May 9, 2024.

7. View of agricultural- row crop area facing west. May 9, 2024.

8. View of irrigation ditch facing west. May 9, 2024.

Page 2 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

9. View of irrigation facing north. May 9, 2024. 10. View of developed area within WWTP, facing northeast.

May 9, 2024.

11. View of ponds within WWTP facing west. May 9, 2024. 12. View of active barn swallow nest on WWTP structures.

May 9, 2024.

Page 3 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

13. View of developed area within WWTP facing north. May 9, 2024.

14. View of active California ground squirrel burrow. May 9, 2024.

Page 4 of 4 ends

Attachment C
D-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT D

VASCULAR PLANT AND ANIMAL SPECIES OBSERVED
The following plant species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Vascular Plant Species Observed

EUDICOTS
Apiaceae Carrot Family
* Conium maculatum Poison hemlock
Amaranthaceae Amaranth Family
* Chenopodium album Lamb’s quarter
* Chenopodiastrum murale Nettle-leaved goosefoot
Asteraceae Sunflower Family
Baccharis pilularis Coyote bush
* Carduus pycnocephalus Italian thistle
Erigeron canadensis Common horseweed
* Helminthotheca echioides Bristly oxtongue
Heterotheca grandiflora Telegraphweed
Matricaria discoidea Pineapple weed
* Senecio vulgaris Common groundsel
* Sonchus arvensis Sow thistle
Aizoaceae Iceplant Family
* Carpobrotus edulis Iceplant
Boraginaceae Borage Family
Amsinckia intermedia Common fiddleneck
Brassicaceae Mustard Family
* Brassica nigra Black mustard
* Capsella bursa-pastoris Shepherd’s purse
* Coronopus didymus Lesser swine-cress
* Hirschfeldia incana Short pod mustard
* Raphanus raphanistrum Wild radish
* Sisymbrium irio London rocket
Caryophyllaceae Pink Family
* Stellaria media Common chickweed
Fabaceae Legume Family
* Medicago polymorpha Burr clover
* Melilotus indicus Yellow sweetclover
* Trifolium hirtum Rose clover
Fagaceae Oak Family
Quercus agrifolia Coast live oak
D-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Vascular Plant Species Observed
Frankeniaceae Frankenia Family
Frankenia salina Alkali heath
Geraniaceae Geranium Family
* Erodium botrys Big heron bill
Malvaceae Mallow Family
* Malva parviflora Cheesweed mallow
Myrsinaceae Myrsine Family
* Lysimachia arvensis Scarlet pimpernel
Onagraceae Evening Primrose Family
Camissonia strigulosa Sandysoil suncup
Enothera biennis Common evening primrose
Papaveraceae Poppy Family
Eschscholzia californica California poppy
Plantaginaceae Plantain Family
* Plantago lanceolata English plantain
Polygonaceae Buckwheat Family
* Rumex crispus Curly dock
Salicaceae Willow Family
Salix laevigata Red willow
Salix exigua Narrowleaf willow
Solanaceae Nightshade Family
* Nicotiana glauca Tree tobacco
Urticaceae Nettle Family
* Urtica urens Dwarf nettle

MONOCOTS
Cyperaceae Sedge Family
Schoenoplectus californicus California bulrush
Poaceae Grass Family
* Avena fauta Wild oats
Bromus madritensis Red brome
* Cynodon dactylon Bermuda grass
* Bromus diandrus Ripgut brome
* Ehrharta calycina Perennial veldt grass
* Hordeum murinum Mouse barley
* Festuca myuros Rattail sixweeks grass
* Festuca perennis Italian rye grass
* Lamarckia aurea Goldentop grass
* Polypogon monspeliensis Rabbitsfoot grass
* Schismus arabicus Mediterranean grass
Sorghum halepense Johnson grass
* Triticum aestivum Common wheat
D-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) The following animal species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Animal Species Observed

REPTILIA REPTILES
Phrynosomatidae Phrynosomatid Lizards
Sceloporus occidentalis Western fence lizard
Colubridae Colubrid Snakes
Pituophis catenifer Gophersnake

AVES BIRDS
Anatidae Ducks, Geese, and Swans
Anas platyrhynchos Mallard
Oxyura jamaicensis Ruddy duck
Rallidae Rails, Gallinules, and Coots
Fulica americana American coot
Recurvirostridae Stilts and Avocets
Himantopus mexicanus Black-necked stilt
Recurvirostra americana American avocet
Charadriidae Plovers and Lapwings
Charadrius vociferus Killdeer
Scolopacidae Sandpipers
Tringa flavipes Lesser yellowlegs
Columbidae Pigeons and Doves
Zenaida macroura Mourning dove
Trochilidae Hummingbirds
Calypte anna Anna’s hummingbird
Tyrannidae Tyrant Flycatchers
Sayornis nigricans Black phoebe
Cathartidae New World Vultures
Cathartes aura Turkey vulture
Accipitridae Hawks, Kites, Eagles, and Allies
Buteo jamaicensis Red-tailed hawk
Falconidae Caracaras and Falcons
Falco sparverius American kestrel
Corvidae Crows and Jays
Corvus brachyrhynchos American crow
Alaudidae Larks
Eremophila alpestris Horned lark
Hirundinidae Swallows
Hirundo rustica Barn swallow
Petrochelidon pyrrhonota Cliff swallow
D-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Animal Species Observed
Mimidae Mockingbirds and Thrashers
Mimus polyglottos Northern mockingbird
Sturnidae Starlings
* Sturnus vulgaris European starling
Passeridae Old World Sparrows
* Passer domesticus House sparrow
Fringillidae Fringilline and Cardueline Finches and Allies Haemorhous mexicanus House finch
Passerellidae New World Sparrows
Melospiza melodia Song sparrow
Icteridae Blackbirds
Agelaius phoeniceus Red-winged blackbird
Euphagus cyanocephalus Brewer’s blackbird
Quiscalus mexicanus Great-tailed grackle
Parulidae Wood Warblers
Leiothlypis celata Orange-crowned warbler
Geothlypis trichas Common yellowthroat

MAMMALIA MAMMALS
Geomyidae Pocket Gophers
Thomomys bottae Botta’s pocket gopher
Sciuridae Squirrels, Chipmunks, and Marmots
Otospermophilus beecheyi California ground squirrel

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT E

SUMMARY OF SPECIAL-STATUS SPECIES
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Hoover’s
bentgrass
Agrostis hooveri US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in mostly sandy
soil within chaparral, closed-cone coniferous
forest, cismontane woodland and
valley/foothill grassland between 6 and 610
m in elevation. Found in San Luis Obispo and
Santa Barbara counties.

April–July Not expected. There is one known record of
occurrence in the project vicinity 1 (CNDDB
2013). The project site does not contain
chaparral, closed-cone coniferous forest,
cismontane woodland and valley/foothill
grassland habitats.

Aphanisma Aphanisma blitoides US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal dunes and coastal scrub in
sometimes gravelly and sandy soils between
1 and 305 m in elevation. Found in Los
Angeles, Orange, San Diego, Santa Barbara
and Ventura counties.

February–June Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent.

Santa
Margarita
manzanita
Arctostaphylos
pilosula
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
Broadleafed upland forest, Chaparral,
Cismontane woodland, and Closed-cone
coniferous forest between 75 and 1,100 m
in elevation. San Luis Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent. This perennial species was not
observed within the project site.

La Purisima
manzanita
Arctostaphylos
purissima
US: –
CA: –
CNPS: 1B.1
Perennial evergreen shrub found in coastal
scrub and sandy chaparral between 60 and
390 m in elevation. Santa Barbara County.

November–May Not expected. There are no known records of occurrence in project vicinity and coastal
scrub and sandy chaparral are absent. This
perennial species was not observed within
the project site.

Refugio
manzanita
Arctostaphylos
refugioensis
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub found in
chaparral (sandstone) between 274 and 820
m in elevation. Santa Barbara County.
(May)December–
March
Not expected. There are no known records of
occurrence in project vicinity and chaparral
(sandstone) is absent. This perennial species
was not observed within the project site.

Sand mesa
manzanita
Arctostaphylos rudis US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
maritime, sandy chaparral between 25 and
322 m. Santa Barbara County.

November–
February
Not expected. There are no known records of
occurrence in project vicinity and maritime,
sandy chaparral is absent. This perennial
species was not observed within the project
site.

Marsh
sandword
Arenaria paludicola US: FE
CA: CE
CNPS: 1B.1
Perennial stoloniferous herb occurring in
marshes and swamps (brackish freshwater)
between 3 and 170 m in elevation. Found in
Los Angeles, Marin, Riverside and San Luis
Obispo counties.

May–August Not expected. There are no known records of
occurrence in project vicinity and marshes
and swamps (brackish freshwater) habitat is
absent.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Mile’s milk-vetchAstragalus
didymocarpus var.
milesianus
US: –
CA: –
CNPS: 1B.2
Annual herb found in coastal scrub on clay
soils between 20 and 90 m in elevation.

Found in San Luis Obispo, Santa Barbara and
Ventura County.

March–June Not expected. There are no known records of
occurrence in project vicinity and coastal
scrub habitat is absent.

San Luis Obispo
owl's-clover
Castilleja densiflora
var. obispoensis
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in meadows/seeps
and valley/foothill grassland between 10
and 430 m in elevation. San Luis Obispo
County.

March-May Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Santa Barbara
ceanothus
Ceanothus
impressus
var. impressus
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 40 and 470 m in
elevation. Santa Barbara County.

February- April Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Nipomo Mesa
ceanothus
Ceanothus
impressus var.
nipomensis
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 30 and 245 m in
elevation. Santa Barbara and San Luis
Obispo counties.

February- April Not expected. There is one known record of occurrence in the project vicinity (CNDDB
1974) and chaparral habitat is absent.

Coastal
goosefoot
Chenopodium
littoreum
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 10 and 30 m in elevation. Found in
Los Angeles, San Luis Obispo and Santa
Barbara counties.

April-August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Bolander's
water-hemlock
Cicuta maculata
var. bolanderi
US: –
CA: –
CNPS: 2B.2
Perennial herb occurring in marshes and
swamps (brackish, coastal, freshwater)
between 0 and 200 m in elevation. Found in
Contra Costa, Marin, Sacramento, Santa
Barbara and Solano counties.

July-September Not expected. There are no known records of occurrence in project vicinity and marsh
habitat is absent.

Surf thistle Cirsium
rhothophilum
US: –
CA: CT
CNPS: 1B.2
Perennial herb occurring in coastal bluff
scrub and coastal dunes between 3 and 60
m in elevation. Santa Barbara and San Luis
Obispo counties.

April-June Not expected. There are no known records of
occurrence in project vicinity and coastal bluff
scrub and coastal dunes habitat is absent.

La Graciosa
thistle
Cirsium scariosum
var.
loncholepis
US: FE
CA: CT
CNPS: 1B.1
Perennial herb occurring in mesic, sandy
cismontane woodland, coastal dunes,
coastal scrub, marshes, swamps (brackish),
and valley/foothill grassland between 4 and
220 m in elevation. Santa Barbara and San
Luis Obispo counties.

May–August Not expected. There are three known records
of occurrence in the project vicinity (CNDDB
1983, 1990, 1991) and cismontane woodland,
coastal dunes, coastal scrub, marshes,
swamps (brackish), and valley/foothill
grassland habitats are absent.

E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
California saw-grassCladium
californicum
US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
meadows, seeps, marshes and swamps
(alkaline, freshwater) between 60 and 1,600
m in elevation. Found in Southern California
counties.

June–September Not expected. There are no known records of occurrence in project vicinity and meadows,
seeps, marshes and swamps habitat is absent.

Pismo clarkia Clarkia speciosa ssp.
immaculata
US: FE
CA: CR
CNPS: 1B.1
Annual herb occurring in chaparral (margins,
openings), cismontane woodland, and
valley/foothill grassland between 25 and
185 in elevation. San Luis Obispo County.

May-July Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Seaside bird's-beakCordylanthus
rigidus
ssp.
littoralis
US: –
CA: CE
CNPS: 1B.1
Annual herb (hemiparasitic) occurring in
closed-cone coniferous forest, maritime
chaparral, cismontane woodland, coastal
dunes, and coastal scrub between 0 and 515
m in elevation. Monterey and Santa Barbara
County.

April–October Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral,
cismontane woodland, coastal dunes, and
coastal scrub habitat is absent.

Gaviota
tarplant
Deinandra
increscens
ssp.
villosa
US: FE
CA: CE
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal scrub and valley/foothill grassland
between 20 and 430 m in elevation. Santa
Barbara County.

May–October Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Dune larkspur Delphinium parryi
ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring maritime chaparral
and coastal dunes between 0 and 200 m in
elevation. Found in Santa Barbara, San Luis
Obispo and Ventura counties.

April–June Not expected. There is one historical record of occurrence in the project vicinity (CNDDB
1943) and maritime chaparral and coastal
dunes habitat is absent.

Beach
spectaclepod
Dithyrea maritima US: –
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrubs (sandy)
between 3 and 50 m in elevation. Found in
San Luis Obispo, Santa Barbara and Ventura
counties.

March–May Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrubs habitat is absent.

Blochman’s
dudleya
Dudleya
blochmaniae ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in coastal bluff
scrub, chaparral, coastal scrub and
valley/foothill grassland in often clay, rocky
and serpentinite soil between 5 and 450 m
in elevation. Found in Santa Barbara, San
Luis Obispo, Ventura, Orange, Los Angeles,
and San Diego counties.

April–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent. The project site does not
contain suitable soil types for this species.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Blochman's
leafy daisy
Erigeron
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 3
and 45 m in elevation. Found in San Luis
Obispo and Santa Barbara counties.

June–August Not expected. There is one known record of
occurrence in project vicinity (CNDDB 1991)
and coastal dunes and coastal scrub habitat is
absent.

Lompoc yerba
santa
Eriodictyon
capitatum
US: FE
CA: CR
CNPS: 1B.2
Perennial evergreen shrub occurring in
coastal bluff scrub, closed-cone coniferous
forest, and maritime chaparral between 40
and 900 m in elevation. Santa Barbara
County.

May–September Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, closed-cone coniferous forest, and
maritime chaparral habitat is absent.

Mesa horkelia Horkelia cuneata
var. puberula
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in chaparral,
cismontane woodland, and coastal scrub on
sandy or gravelly soils between 70 and 810
m in elevation. Found in Central Coast and
Southern California counties.

February–July Not expected. There are no known records of occurrence in project vicinity and chaparral,
cismontane woodland, and coastal scrub
habitat is absent.

Kellogg's
horkelia
Horkelia cuneata
var. sericea
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in closed-cone
coniferous forest, maritime chaparral,
coastal dunes, and coastal scrub between
10 and 200 m in elevation. Found in Central
Coast and Bay Area counties.

April–September Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral, coastal
dunes, and coastal scrub habitat is absent.

Beach layia Layia carnosa US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes and
coastal scrub (sandy) between 0 and 60 m in
elevation. Found in Santa Barbara, San
Francisco, Monterey, Marin, and Humboldt
counties.

March–July Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

Blushing layia Layia erubescens US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes and
coastal scrub between 10 and 245 m in
elevation. Santa Barbara and San Luis
Obispo County.

March-May Not expected. There is one historical record
of occurrence in project vicinity (CNDDB
1937) and coastal dunes and coastal scrub
habitat is absent.

Pale-yellow
layia
Layia heterotricha US: –
CA: –
CNPS: 1B.1
Annual herb occurring in cismontane
woodland, coastal scrub, pinyon/juniper
woodland, and valley/foothill grassland
between 300 and 1,705 m in elevation.

Found in Fresno, Monterey, San Benito,
Santa Barbara and Ventura counties.

March–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

San Luis Obispo
County lupine
Lupinus
ludovicianus
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chapparal and
cismontane woodland between 50 and 525
m in elevation. San Luis Obispo County.

April-July Not expected. There are no known records of
occurrence in project vicinity and chapparal
and cismontane woodland habitat is absent.

E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Nipomo Mesa
lupine
Lupinus nipomensis US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes
between 10 and 50 m in elevation. San Luis
Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Slender
bushmallow
Malacothamnus
jonesii var. gracilis
US: –
CA: –
CNPS: 1B.1
Perennial deciduous shrub occurring in
chaparral between 190 and 575 m in
elevation. San Luis Obispo and Santa
Barbara County.

May-October Not expected. There are no known records of occurrence in project vicinity and chaparral
habitat is absent.

Southern curly-leaved
monardella
Monardella sinuata
ssp.
sinuata
US: –
CA: –
CNPS: 1B.1
Annual herb occurring in chaparral, coastal
dunes, coastal scrub openings, and
cismontane woodland between 0 and 300 m
in elevation. San Luis Obispo and Santa
Barbara counites.

April–September Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal dunes, coastal scrub openings, and
cismontane woodland habitat is absent.

Crisp
monardella
Monardella
undulata ssp. crispa
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 120 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

April–August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

San Luis Obispo
monardella
Monardella
undulata ssp.
undulata
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 200 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

May–September Not expected. There are two known records of occurrence in the project vicinity (CNDDB
1979) and coastal dunes and coastal scrub
habitat is absent.

Aparejo grass Muhlenbergia utilis US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
chaparral, coastal scrub, meadows, seeps,
marches/swamps, and cismontane
woodland between 25 and 2,325 m in
elevation. Found in Central Coast and
Central Valley counties.

March–October Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal scrub, meadows, seeps,
marches/swamps, and cismontane woodland
habitat is absent.

Gambel's water
cress
Nasturtium
gambelii
US: FE
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
marshes and swamps (brackish, freshwater)
between 5 and 330 m in elevation. Found in
Santa Barbara, San Luis Obispo, Los Angeles
and Orange counties.

April–October Not expected. There are no known records of occurrence in project vicinity and marshes
and swamps habitat is absent.

Coast woolly-headsNemacaulis
denudata var.
denudate
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 0 and 100 m in elevation. Found in
Los Angeles, Orange, San Diego, and San
Luis Obispo counties.

April-September Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Black-flowered
figwort
Scrophularia atrata US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub between
10 and 500 m in elevation. San Luis Obispo
and Santa Barbara counites.

March–July Not expected. There are no known records of
occurrence in project vicinity and chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub habitat is
absent.

San Bernardino
aster
Symphyotrichum
defoliatum
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
cismontane woodland, coastal scrub, lower
montane coniferous forest, meadows,
seeps, marshes and swamps and
valley/foothill grassland (vernally mesic)
between 2 and 2,040 m in elevation. Found
in Southern California counties.

July–November Not expected. There are no known records of occurrence in project vicinity and cismontane
woodland, coastal scrub, lower montane
coniferous forest, meadows, seeps, marshes
and swamps and valley/foothill grassland
(vernally mesic) is absent.
1 Project vicinity = Project plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (CFP), California Special Plant (CSP), California Special Animal (CSA) California Native Plant Society Designations:
1B = Rare, threatened, or endangered in California and elsewhere 2B = Rare, threatened, or endangered in California, but not elsewhere

0.1 = seriously endangered

0.2 = fairly endangered
CA = California
CNPS = California Native Plant Society
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale

CRUSTACEANS
Vernal pool fairy
shrimp
Branchinecta lynchi US: FT
CA: –
Endemic to the grasslands of the Central Valley, Central Coast mountains, and South Coast mountains, in astatic
rain-filled pools. Inhabit small, clear-water sandstone-depression pools and grassed swale, earth slump, or basalt-flow depression pools.

Not expected. There is one known record
of occurrence in the project vicinity 1
(CNDDB 2006) and vernal pool habitat is
absent from the project site.

INSECTS
Monarch - California
overwintering
population
Danaus plexippus
pop. 1
US: FC
CA: SA
Winter roost sites extend along the coast from northern Mendocino to Baja California, Mexico. Roosts in wind-protected tree groves (eucalyptus, Monterey pine, cypress), with nectar and water sources nearby.

Not expected. There are six known
records of occurrence in the project
vicinity (CNDDB 1998, 2012, 2017,2022)
and suitable roosting trees and milkweed
are absent.

FISH
Tidewater goby Eucyclogobius
newberryi
US: FE
CA: –
Brackish water habitats along the California coast from Agua Hedionda Lagoon, San Diego County to the mouth of
the Smith River. Found in shallow lagoons and lower
stream reaches, they need fairly still but not stagnant water and high oxygen levels.

Not expected. There are no known
records of occurrence in the project
vicinity. No brackish water or lagoons are
present in the project site.

Unarmored
threespine
stickleback
Gasterosteus
aculeatus
williamsoni
US: FE
CA: CE
Weedy pools, backwaters, and among emergent
vegetation at the stream edge in small Southern California streams. Cool (<24 C), clear water with abundant
vegetation.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Arroyo chub Gila orcuttii US: –
CA: SSC
Native to streams from Malibu Creek to San Luis Rey River basin. Introduced into streams in Santa Clara, Ventura, Santa Ynez, Mojave and San Diego river basins. Slow
water stream sections with mud or sand bottoms. Feeds
heavily on aquatic vegetation and associated
invertebrates.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Steelhead - Southern
California DPS
Oncorhynchus
mykiss irideus pop.
10 US: FE
CA: –
Federal listing refers to populations from Santa Maria
River south to southern extent of range (San Mateo Creek in San Diego County). Southern steelhead likely have
greater physiological tolerances to warmer water and
more variable conditions.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
steelhead - south-central California
coast DPS
Oncorhynchus
mykiss irideus pop.
9 US: FT
CA: –
Federal listing refers to runs in coastal basins from the Pajaro River south to, but not including, the Santa Maria River.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project.

AMPHIBIANS
California tiger
salamander - Santa
Barbara County DPS
Ambystoma
californiense pop. 2
US: FE
CA: CT
Lives in vacant or mammal-occupied burrows throughout
most of the year; in grassland, savanna, or open woodland habitats. Needs underground refuges, especially ground
squirrel burrows, and vernal pools or other seasonal water sources for breeding.

Low probability of occurrence. There are
10 known records of occurrence in the
project vicinity with the most recent from
2014 (CNDDB 2024). While there are no
vernal pools present within the project
site, CTS have been documented to breed
in sewage treatment plants. Furthermore,
active California ground squirrel burrows
were observed within the WWTP that
could provide upland sheltering habitat.

The project site is just outside the 2-mile
dispersal range of known breeding ponds,
there is some potential that CTS could use
the WWTP for breeding and upland
habitat.

Arroyo toad Anaxyrus californicus US: FE
CA: SSC
Semi-arid regions near washes or intermittent streams,
including valley-foothill and desert riparian, desert wash, etc. Rivers with sandy banks, willows, cottonwoods, and sycamores; loose, gravelly areas of streams in drier parts of range.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project site.

Foothill yellow-legged frogRana boylii US: –
CA: CE, SSC
Partly-shaded, shallow streams and riffles with a rocky substrate in a variety of habitats. Needs at least some cobble-sized substrate for egg-laying. Needs at least 15 weeks to attain metamorphosis.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project site.

California red-legged
frog
Rana draytonii US: FT
CA: SSC
Lowlands and foothills in or near permanent sources of
deep water with dense, shrubby or emergent riparian
vegetation. Prefers aquatic habitat with deep (2 feet or deeper) areas
with undercut banks, emergent aquatic vegetation, and
bank cover. Does not occur in salt marshes or wetland with brackish water.

Low to moderate probability of
occurrence. There are 28 records of
occurrence in the project vicinity with the
most recent from 2007 (CNDDB 2024).

CLRF have potential to use the WWTP as
breeding, non-breeding, and dispersal
habitat. Several active California ground
squirrel burrows were observed in the
E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
WWTP that could provide upland habitat.

Furthermore, several burrows were
observed along the eastern margin of the
project site adjacent to the agricultural
row crops that could provide upland
dispersal/sheltering habitat. These
burrows are in close proximity to several
irrigation basins located immediately
outside the project site boundary that
could provide habitat for CRLF.

Western spadefoot Spea hammondii US: –
CA: SSC
Occurs primarily in grassland and other relatively open habitats. Found in elevations ranging from sea level to 4,500 ft. Requires temporary pools for breeding.

Low to moderate probability of
occurrence. There are 17 records of
occurrence in the project vicinity with the
most recent from 2010 (CNDDB 2024).

The project site does not contain aquatic
habitat suitable for breeding. However,
several burrows were observed along the
eastern margin of the project site that
could provide upland dispersal/sheltering
habitat. These burrows are in close
proximity to several irrigation basins
located immediately outside the project
site boundary.

REPTILES
Northern California
legless lizard
Anniella pulchra US: –
CA: SSC
Sandy or loose loamy soils under sparse vegetation. Soil moisture is essential. They prefer soils with a high moisture content.

Low probability of occurrence. There are
15 records of occurrence in the project
vicinity with the most recent from 2016
(CNDDB 2024). Portions of the WWTP site
could provide suitable habitat. Although,
the routine maintenance and
longstanding agricultural activities reduce
suitability.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
Western pond turtle Emys marmorata US: –
CA: SSC
A thoroughly aquatic turtle of ponds, marshes, rivers,
streams and irrigation ditches, usually with aquatic
vegetation, below 6000 ft elevation. Needs basking sites and suitable (sandy banks or grassy open fields) upland habitat up to 0.5 km from water for egg-laying.

Low to moderate probability of
occurrence. There is one record of
occurrence in the project vicinity (CNDDB
1995). Pond turtles have been
documented to breed and thrive in
sewage plants. Therefore, the WWTP has
potential to support aquatic and breeding
habitat. The agricultural portions of the
site do not contain aquatic or upland
habitat.

Coast horned lizard Phrynosoma
blainvillii
US: –
CA: SSC
Frequents a wide variety of habitats, most common in
lowlands along sandy washes with scattered low bushes.

Open areas for sunning, bushes for cover, patches of loose soil for burial, and abundant supply of ants and other
insects.

Low probability of occurrence. There are
three records of occurrence in the project
vicinity (CNDDB 2008, 2015). Portions of
the WWTP site could provide suitable
habitat. Although, the routine
maintenance and longstanding
agricultural activities reduce suitability.

Two-striped garter
snake
Thamnophis
hammondii
US: –
CA: SSC
Coastal California from Salinas to northwest Baja,
California; sea level to 7,000-foot elevation. Found in and near permanent freshwater streams with rocky beds and
riparian growth.

Not expected. There are no known
records of occurrence in the project
vicinity. The project site does not contain
suitable aquatic habitat.

BIRDS
Tricolored blackbird
(breeding colony)
Agelalus tricolor US: –
CA: CT, SSC
Occurs in open country or marshes in large colonies
mainly in California’s Central Valley. Breeds in freshwater marshes with tall emergent vegetation, feeds on insects.

Low to Moderate probability of nesting
and foraging. There are no known records
of occurrence in the project vicinity.

Several eBird records have documented
tricolored within the WWTP as recently as
2022. Emergent vegetation is present
along the perimeter of the ponds within
the WWTP and could provide suitable
nesting and foraging habitat.

Burrowing owl Athene cunicularia US: –
CA: SSC
Open, dry annual or perennial grasslands, deserts, and
scrublands characterized by low-growing vegetation.

Subterranean nester, dependent upon burrowing
mammals, most notably, the California ground squirrel.

Low to Moderate probability of
occurrence. There are two known records
of occurrence in the project vicinity
(CNDDB 2003, 2009). Several eBird
records have documented tricolored
E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the WWTP as recently as 2010.

California ground squirrel burrows were
observed within the WWTP and could
provide nesting habitat.

Swainson's hawk Buteo swainsoni US: –
CA: CT
Breeds in grasslands with scattered trees, juniper-sage flats, riparian areas, savannahs, and agricultural or ranch lands with groves or lines of trees. Requires adjacent
suitable foraging areas such as grasslands, or alfalfa or grain fields supporting rodent populations.

Low to moderate probability of foraging,
nesting not expected. There is one
historical of occurrence in the project
vicinity (CNDDB 1896). There are several
eBird records within the vicinity of the
project with the most recent from 2018.

Suitable foraging habitat is present within
the project site.

Western snowy
plover
Charadrius
alexandrines
nivosus
US: FT
CA: SSC
Sandy beaches, salt pond levees and shores of large alkali lakes. Requires barren areas with sandy, gravelly or friable soils for nesting.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

American peregrine
falcon
Falco peregrinus
anatum
US: FD
CA: CD, FP
Near wetlands, lakes, rivers, or other water; on cliffs, banks, dunes, mounds; also, human-made structures.

Nest consists of a scrape or a depression or ledge in an open site.

Moderate probability of foraging, nesting
not expected. There are no known
records of occurrence in the project
vicinity. Several eBird records have
documented the species as recently as
2022 and one eBird record documented
the species within the WWTP in 2013.

Suitable nesting habitat is absent from the
project site, marginal foraging habitat is
present.

California black rail Laterallus
jamaicensis
coturniculus
US: –
CA: CT, FP
Inhabits freshwater marshes, wet meadows and shallow
margins of saltwater marshes bordering larger bays.

Needs water depths of about 1 inch that do not fluctuate during the year and dense vegetation for nesting habitat.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Yellow warbler Setophaga petechia US: –
CA: SSC
Riparian plant associations in close proximity to water.

Also nests in montane shrubbery in open conifer forests in Cascades and Sierra Nevada. Frequently found nesting
and foraging in willow shrubs and thickets, and in other riparian plants including cottonwoods, sycamores, ash,
and alders.

Low to moderate probability of nesting
and foraging. There are no records of
occurrence in the project vicinity. There
are two eBird records of yellow warbler
within the WWTP as recently as 2020 and
several other eBird records from 2024
E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the vicinity. The WWTP contains
suitable foraging and nesting habitat.

California least tern Sternula antillarum
browni
US: FE
CA: CE, FP
Nests along the coast from San Francisco Bay south to
northern Baja California. Colonial breeder on bare or
sparsely vegetated, flat substrates: sand beaches, alkali flats, land fills, or paved areas.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Least Bell's vireo Vireo bellii pusillus US: FE
CA: CE
Summer resident of Southern California in low riparian in vicinity of water or in dry river bottoms; below 2000 ft.

Nests placed along margins of bushes or on twigs
projecting into pathways, usually willow, Baccharis,
mesquite.

Not Expected. There are no known
historical records of occurrence in the
project vicinity or documented eBird
records. Marginal nesting Suitable nesting
habitat is present in the WWTP.

MAMMALS
Pallid bat Antrozous pallidus US: –
CA: SSC
Deserts, grasslands, shrublands, woodlands and forests.

Most common in open, dry habitats with rocky areas for
roosting.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Townsend's big-eared batCorynorhinus
townsendii
US: –
CA: SSC
Throughout California in a wide variety of habitats. Most common in mesic sites. Roosts in the open, hanging from walls and ceilings. Roosting sites limiting. Extremely
sensitive to human disturbance.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Western red bat Lasiurus blossevillii US: –
CA: SSC
Roosts primarily in trees, 2–40 ft above ground, from sea level up through mixed conifer forests. Prefers habitat edges and mosaics with trees that are protected from
above and open below, with open areas for foraging.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

American badger Taxidea taxus US: –
CA: SSC
Most abundant in drier open stages of most shrub, forest, and herbaceous habitats, with friable soils. Needs
sufficient food, friable soils and open, uncultivated
ground. Preys on burrowing rodents. Digs burrows.

Not Expected. There are four records of
occurrence in the project vicinity (CNDDB
1984, 1988, 1989, 1991) and suitable
habitat is absent.
1 Project vicinity = Project site plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (FP), California Special Animal (CSA) CA = California
DPS= Distinct Population Segment
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX G BASIN PLAN OBJECTIVES
Central Coastal Basin Plan -36- June 2019 Edition
Table 3-1. Guidelines for Interpretation of Quality of Water for Irrigationa Water Quality Guidelines
Problem and Related Constituent No Problem Increasing
Problems
Severe
Salinityb
EC of irrigation water, mmho/cm <0.75 0.75 - 3.0 >3.0
Permeability
EC of irrigation water, mmho/cm >0.5 <0.5 <0.2
SAR, adjustedc <6.0 6.0 - 9.0 >9.0
Specific ion toxicityd from root absorption
Sodium (evaluate by adjusted SAR) <3 3.0 - 9.0 >9.0
Chloride
me/L <4 4.0 - 10 >10
mg/L <142 142 - 355 >355
Boron, mg/L <0.5 0.5 - 2.0 2.0 - 10.0
Specific ion toxicityd from foliar absorptione (sprinklers) Sodium
me/L <3.0 >3.0 --
mg/L <69 >69 --
Chloride
me/L <3.0 >3.0 --
mg/L <106 >106 --
Miscellaneousf
NH4 - N, mg/L for sensitive crops <5 5 - 30 >30
NO3 - N, mg/L for sensitive crops <5 5 - 30 >30
HCO3 (only with overhead sprinklers)
me/L <1.5 1.5 - 8.5 >8.5
mg/L <90 90 - 520 >520
pH Normal range 6.5 - 8.4 --
a. Interpretations are based on possible effects of constituents on crops and/or soils. Guidelines are flexible and should be modified when warranted by local experience or special conditions of crop, soil, and method of irrigation. b. Assumes water for crop plus needed water for leaching requirement (LR) will be applied. Crops vary in tolerance to salinity. Refer to tables for crop tolerance and LR. The mmho/cm x 640 = approximate total dissolved solids (TDS) in mg/L or ppm; mmho x 1,000 = micromhos. c. Adjusted SAR (sodium adsorption ratio) is calculated from a modified equation developed by U.S. Salinity Laboratory to include added effects of precipitation and dissolution of calcium in soils and related to CO3 + HCO3 concentrations.

To evaluate sodium (permeability) hazard: Adjusted SAR = Na/[1/2 (Ca + Mg)] 1/2[1+ (8.4 - pHc)].

Refer to Appendix A-26 for calculation assistance.

SAR can be reduced if necessary by adding gypsum. Amount of gypsum required (GR) to reduce a hazardous SAR to any desired SAR (SAR desired) can be calculated as follows:

Note: Na and Ca + Mg should be in me/L. GR will be in lbs. of 100 percent gypsum per acre foot of applied water. d. Most tree crops and woody ornamentals are sensitive to sodium and chloride (use values shown). Most annual crops are not sensitive (use salinity tolerance tables). For boron sensitivity, refer to boron tolerance tables. A source of tolerance tables is “Agricultural Salinity and Drainage,” University of California Water Management Series publication 3375, revised 2006. e. Leaf areas wet by sprinklers (rotating heads) may show a leaf burn due to sodium or chloride absorption under low humidity/high evaporation conditions. (Evaporation increases ion concentration in water films on leaves between rotations of sprinkler heads.) f. Excess N may affect production or quality of certain crops; e.g., sugar beets, citrus, avocados, apricots, etc. (1 mg/L NO3 - N = 2.72 lbs. N/acre foot of applied water.) HCO3 with overhead sprinkler irrigation may cause a white carbonate deposit to form on fruit and leaves. 234Mg)+(Ca SAR desired
2(Na ) GR = 2
2 

 

 −
Central Coastal Basin Plan -37- June 2019 Edition
Table 3-2. Water Quality Objectives for Agricultural Water Use _____________________________________________________________________________________ Maximum Concentration (mg/L)
a
Element Irrigation Livestock
supplyb watering
_____________________________________________________________________________________ Aluminum 5.0 5.0
Arsenic 0.1 0.2
Beryllium 0.1 --
Boron 0.75 5.0
Cadmium 0.01 0.05
Chromium 0.10 1.0
Cobalt 0.05 1.0
Copper 0.2 0.5
Fluoride 1.0 2.0
Iron 5.0 --
Lead 5.0 0.1c
Lithium 2.5d --
Manganese 0.2 --
Mercury -- 0.01
Molybdenum 0.01 0.5
Nickel 0.2 --
Nitrate + Nitrite -- 100
Nitrite -- 10
Selenium 0.02 0.05
Vanadium 0.1 0.10
Zinc 2.0 25
_____________________________________________________________________________________ a. Values based primarily on "Water Quality Criteria 1972" National Academy of Sciences-National Academy of Engineers, Environmental Study Board, ad hoc Committee on Water Quality Criteria furnished as recommended guidelines by University of California Agriculture Extension Service, January 7, 1974; maximum values are to be considered as 90 percentile values not to be exceeded.
b. Values provided will normally not adversely affect plants or soils; no data available for mercury, silver, tin, titanium, and tungsten.
c. Lead is accumulative and problems may begin at threshold value (0.05 mg/L). d. Recommended maximum concentration for irrigating citrus is 0.075 mg/L.

Central Coastal Basin Plan -41- June 2019 Edition
Table 3-6. Median Groundwater Objectives, mg/La
Basin/Sub-Area TDS Cl SO4 B Na Nb
Big Basin
Near Felton 100 20 10 0.2 10 1
Near Boulder Creek 250 30 50 0.2 20 5
Pajaro Valley
Hollister 1200 150 250 1.0 200 5
Tres Pinos 1000 150 250 1.0 150 5
Llagas 300 20 50 0.2 20 5
Salinas Valley
Upper Valleyf 600 150 150 0.5 70 5
Upper Forebayf 800 100 250 0.5 100 5
Lower Forebayf 1500 250 850 0.5 150 8
180 foot Aquiferf 1500 250 600 0.5 250 1
400 foot Aquiferf 400 50 100 0.2 50 1
Paso Robles Areag
Central Basinf 400 60 45 0.3 80 3.4
San Miguelf 750 100 175 0.5 105 4.5
Paso Roblesf 1050 270 200 2.0 225 2.3
Templetonf 730 100 120 0.3 75 2.7
Atascaderof 550 70 85 0.3 65 2.3
Estrellaf 925 130 240 0.75 170 3.2
Shandon 1390 430 1025h 2.8 730 2.3
Estero Bay
Santa Rosa 700 100 80 0.2 50 5
Chorro 1000 250 100 0.2 50 5
San Luis Obispo 900 200 100 0.2 50 5
Arroyo Grande 800 100 200 0.2 50 10
Carrizo Plain e e e e e e
Santa Maria River Valleyc
Upper Guadalupef 1000d 165 500d 0.5 230 1.4e
Lower Guadalupef 1000d 85 500d 0.2 90 2.0e
Lower Nipomo Mesaf 710 95 250 0.15 90 5.7e
Orcuttf 740 65 300 0.1 65 2.3e
Santa Mariaf 1000d 90 510 0.2 105 8.0e
Cuyama Valley 1500 80 -- 0.4 -- 5
San Antonio Creek Valley 600 150 150 0.2 100 5
Santa Ynez River Valley
Santa Ynez 600 50 10 0.5 20 1
Santa Rita 1500 150 700 0.5 100 1
Lompoc Plainf 1250 250 500 0.5 250 2
Lompoc Uplandf 600 150 100 0.5 100 2
Lompoc Terracef 750 210 100 0.3 130 1
South Coast
Goleta 1000 150 250 0.2 150 5
Santa Barbara 700 50 150 0.2 100 5
Carpinteria 700 100 150 0.2 100 7
a. Objectives shown are median values based on data averages; objectives are based on preservation of existing quality or water quality enhancement believed attainable following control of point sources. b. Measured as Nitrogen
c. Basis for objectives is in the "Water Quality Objectives for the Santa Maria Ground Water Basin Revised Staff Report, May 1985" and February 1986, Staff Report.
d. These are maximum objectives in accordance with Title 22 of the Code of Regulations. e. Groundwater basin currently exceeds usable mineral quality. f. Groundwater basin boundary maps available in the Appendix: Salinas (Appendix A-32), Paso Robles (Appendix A-33), Santa Maria (Appendix A-34), and Lompoc (Appendix A-35).
g. Basis for objectives is in the report "A Study of the Paso Robles Ground Water Basin to Establish Best Management Practices and Establish Salt Objectives", Coastal Resources Institute, June 1993. h. Standard exceeds California Secondary Drinking Water Standards contained in Title 22 of the Code of Regulations. Water quality standard is based upon existing water quality. If water quality degradation occurs, the Regional Board may consider salt limits on appropriate discharges.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX H SANTA MARIA UPDATED NOTICE OF

APPLICABILITY AND MONITORING AND

REPORTING PROGRAM
Central Coast Regional Water Quality Control Board
June 16, 2023 Sent Via Electronic Mail
Shad Springer, Director of Utilities
City of Santa Maria – Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:
• NOTICE OF APPLICABILITY FOR ENROLLMENT IN ORDER NO. R3-2020- 0020, GENERAL WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES

FROM DOMESTIC WASTEWATER SYSTEMS WITH FLOWS GREATER
THAN 100,000 GALLONS PER DAY;
• TRANSMITTAL OF MONITORING AND REPORTING PROGRAM NO. R3- 2023-0032; AND
• TERMINATION OF INDIVIDUAL PERMIT, WASTE DISCHARGE
REQUIREMENTS ORDER NO. R3-2010-0001 FOR THE CITY OF SANTA MARIA WASTEWATER FACILITY, SANTA BARBARA COUNTY.

The Central Coast Regional Water Quality Control Board (Central Coast Water Board) reviewed the August 5, 2022, notice of intent and available documents associated with City of Santa Maria’s domestic wastewater treatment facility (Wastewater System) located at 601 Black Road in Santa Maria, California. The Wastewater System, owned by the City of Santa Maria is currently regulated pursuant to Waste Discharge Requirements Order No. R3-2010-0001 for the City of Santa Maria Wastewater Facility, Santa Barbara County (Order No. R3-2010-0001).

On September 25, 2020, the Central Coast Water Board adopted General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

This letter serves as a notice of applicability for enrollment in the General Permit. This letter includes: wastewater system operation summary, specific requirements, and City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
limitations (Attachment 1); figures (Attachment 2); and City of Santa Maria’s monitoring and reporting program requirements (Attachment 3).

This letter also serves as a notice of termination of City of Santa Maria’s coverage in existing individual permit, Order No. R3-2010-0001.

City of Santa Maria must comply with the following:

1. General Permit – City of Santa Maria must comply with all conditions and requirements of the General Permit. As described in the General Permit, ongoing operation, maintenance, monitoring, and reporting are required. A copy of the General Permit can be found electronically at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/r32020_0020.pdf

2. Monitoring and Reporting Program – City of Santa Maria must comply with the requirements of the monitoring and reporting program enclosed with this letter (monitoring and reporting program no. R3-2023-0032, Attachment 3). City of Santa Maria must start implementing the monitoring on October 1, 2023. The first quarterly monitoring report is due February 1, 2024 and the first annual report is due March 1, 2024. City of Santa Maria is also required to submit an annual pretreatment program report1 due on March 1st and the annual volumetric reporting requirements2 established by the State Water Resources Control Board (State Water Board), due April 30th. Annual reports must be submitted to the GeoTracker database.

Quarterly monitoring reports and annual reports must be provided electronically in searchable PDF with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed. https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater _permitting/docs/transmittal_sheet.pdf
All annual reports must be formatted and completed as specified in the annual report template found at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf
City of Santa Maria must submit all reports/documents and laboratory data (using the transmittal sheet as the cover page) to the publicly accessible State Water 1 California Code of Regulations title 23 section 2233 View Document - California Code of Regulations (westlaw.com)
2 See: Volumetric Annual Reporting | California State Water Resources Control Board City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Board’s GeoTracker3,4 database with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System – specific global identification number WDR100029526 over the internet at:
https://geotracker.waterboards.ca.gov/esi/login.asp
The attached monitoring and reporting program outlines the GeoTracker electronic reporting requirements. The Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

3. Fees – City of Santa Maria paid an annual fee of $123,934.00 on January 24, 2023 for coverage in existing individual permit, Order No. R3-2010-0001. This payment covers City of Santa Maria‘s enrollment in the General Permit for the 2022-2023 fiscal year.

City of Santa Maria must pay an annual fee to maintain coverage in the General Permit. Annual fees are determined by the State Water Board’s fee program and cover the state fiscal year of July 1 through June 30. The Central Coast Water Board has lowered your assigned threat and complexity rating to 2A which will result in a reduced annual fee (currently $41,063) starting with the 2023-2024 fiscal year. A copy of the current state fee schedule is available electronically at the following link:
https://www.waterboards.ca.gov/resources/fees/water_quality/#wdr

4. Notification – The Central Coast Water Board will be notified of City of Santa Maria’s enrollment at a regularly scheduled public meeting on August 24-25, 2023. Details about that meeting are available on our website at:
https://www.waterboards.ca.gov/centralcoast/board_info/agendas/

5. Future Discharge Modifications – Pursuant to California Water Code section 13260, City of Santa Maria must inform the Central Coast Water Board at least 120 days prior to modifying your discharge. If there are any significant changes in either treatment or disposal methodologies, or the volume or character of the treated wastewater, City of Santa Maria must notify the Central Coast Water Board immediately of such changes.
3 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/ 4 Additional information available at: http://geotracker.waterboards.ca.gov/ City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Attachment 1 contains the Central Coast Water Board’s understanding of the Wastewater System located at 601 Black Road, Santa Maria, CA 93458. Please review Attachment 1 to determine if the description is representative of your current system. Pursuant to California Water Code section 13267, City of Santa Maria must notify the Central Coast Water Board if this information is out of date or incorrect. You are required to provide staff with your updated information within 30 days of issuance of this letter.

6. Responsible Party – City of Santa Maria is responsible for the management and disposal of the domestic wastewater in compliance with the conditions of the General Permit. Any noncompliance with this General Permit constitutes a violation of the California Water Code, and subjects City of Santa Maria to enforcement action, and termination of enrollment under this General Permit.

7. Change in Ownership - In the event of any change in control or ownership of the property, City of Santa Maria must notify the succeeding owner or operator of the existence of this General Permit by letter, a copy of which shall be immediately forwarded to the Central Coast Water Board so that the new owner or operator can be enrolled in the General Permit and City of Santa Maria’s enrollment in the General Permit can be terminated.

8. Certified Operator – City of Santa Maria is required to comply with the operator certification requirements5 administered by the State Water Board’s Office of Operator Certification, which currently requires a Grade IV certified operator onsite to maintain and operate the Wastewater System. The City of Santa Maria must:
a. Keep a current Wastewater Treatment Plant Classification Form on file with the Office of Operator Certification and update the form when modifications to the Wastewater System treatment processes occur. b. Provide the Office of Operator Certification with a Chief Plant Operator Acknowledgement Form and update this information within 30 days of a change of Chief Plant Operator.
c. If a contractor operator is used, the contract operator must register with the Office of Operator Certification and obtain a contract operator certificate for the Wastewater System.

Forms are available at the following link:
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/for m.html
5 Title 23 Division 3. Chapter 26 Wastewater Treatment Plant Classification, Operator Certification and Contract Operator Registration.
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/docs/ocr_clean.pdf City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

9. Termination of Permit – The existing individual permit, Order No. R3-2010-0001 is terminated, except for enforcement purposes.6 City of Santa Maria is responsible for compliance with Order No. R3-2010-0001 prior to the date of this letter.

10.Compliance Plan – As required in the attached monitoring and reporting program, City of Santa Maria must, by June 16, 2024, prepare and submit for Central Coast Water Board review and approval a time schedule compliance plan.

If you have any questions, please contact Cecile Blancarte at (805) 542-4782 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

Sincerely,
for Matthew T. Keeling
Executive Officer
Attachments:

Attachment 1: Wastewater System Operation Summary, Specific Requirements, and Limitations
Attachment 2: Figures
Attachment 3: Monitoring and Reporting Program Order No. R3-2023-0032

cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Office of Operator Certification, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Jesse Woodard, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
6 The General Permit states “… where a Wastewater System discharge is currently regulated by an individual permit, that permit is terminated upon the enrollment of the Wastewater System into this General Permit.”
Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:26
-07'00'
City of Santa Maria - 6 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ECM/CIWQS = CW-255678
GeoTracker No. = GT- WDR100029526
Rev 12/21/2022
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant NOA for R3- 2020-0020
\\ca.epa.local\rb\rb3\shared\wdr\wdr facilities\santa barbara co\santa maria wwtp\order 2020- 0020\final\santa maria r3-2020-0020 noa_final.docx
ATTACHMENT 1

WASTEWATER SYSTEM OPERATION SUMMARY, SPECIFIC REQUIREMENTS,

AND LIMITATIONS

1. OWNERSHIP AND WASTEWATER SYSTEM INFORMATION
Ownership and wastewater system information submitted by City of Santa Maria to the Central Coast Water Board is shown in Table 1.

Table 1. Ownership and Wastewater System Information
Name City of Santa Maria Wastewater
Treatment Plant
Physical Address 601 Black Road Santa Maria, CA 93458
Lattitude 34°56'54.93"N
Longitude 120°29'49.59"W
Mailing Address 2065 E. Main Street, Santa Maria, CA
93454
Owner City of Santa Maria
Operator
Russ P. Newman
phone: (805) 925-0951 x721
e-mail: [email protected]
Legally Responsible Official
Shad Springer
phone: (805) 925-0951 x7211
e-mail: [email protected]
Raw Wastewater
Characteristics
Sewer Connections: 22,020
Population Served: 107,407
Domestic (%): 91%
Industrial (%): 9%
Permitted Design Flow,
Average Monthly (Million
gallons per day, mgd)

8.0 Baseline Flow (average
annual flow) in mgd

7.2 Threat to Water Quality 2
Complexity B
For Internal Use
Fee Code 58
Primary Place Type Wastewater Treatment Facility
Facility Type Municipal/Domestic
Facility Waste Type Domestic Wastewater
Regulatory measure Type Enrollee - WDR
Reclamation Included No
EPA Approved Pretreatment
Program
Yes
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

2. WASTEWATER SYSTEM OPERATION SUMMARY
The City of Santa Maria wastewater treatment facility (Wastewater System) is a Class IV wastewater system. City of Santa Maria must staff a Grade IV chief plant operator for proper operation of the Wastewater System. The current chief plant operator is Russ P.

Newman, Grade IV, Operator No. 29543, Certificate No. 28863 (expires 1/18/2026).

The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. The Wastewater System consists of the treatment technologies and treatment capabilities shown in Table 2.

Table 2. Treatment Technology and Capacity
Headworks/Preliminary
Treatment
The headworks consists of a Parshall flume flow meter,
three automatic bar screens followed by two aerated grit chambers.

Headworks capacity (mgd): 13.5
Primary Treatment
Clarifiers: Primary treatment consists of two primary
clarifiers that operate in parallel. The volume of each clarifying tank is 1.32 million gallons.

Primary treatment capacity (mgd): 27.92
Secondary Treatment
Trickling Filters: Secondary treatment is performed using two primary and two secondary aerobic trickling filters.

Each of the primary trickling filters has a volume of
543,000 gallons. Each of the secondary trickling filters has a volume of 170,000 gallons.

Secondary treatment capacity (mgd): 17.7
Tertiary Treatment Not Applicable
Tertiary treatment capacity (gpd): 0
Disinfection Not Applicable
Disinfection Capacity (gpd): 0
Wastewater Disposal
Method
Percolation Ponds, 123 acres
Disposal capacity (mgd): 8.0
Biosolids/Sludge
Production and
Handling
Gravity Thickeners (2), Anaerobic Digestors (4), and
Sludge Drying Beds, Offsite Composting, and Landfilling Annual production of biosolids: 1,811 tons
The final destination of biosolids produced is hauled off to Engel and Gray Composting, Inc. located at 468-594 Ray
Road, Santa Maria, California, and the City of Santa Maria Landfill, 2065 E. Main Street, Santa Maria, California
Non-Potable Recycled
Water
Non-potable recycled
water produced onsite: Not Applicable
Recycled water usage
areas: Not Applicable
City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Enrolled in WQ 2016-
0068-DDW: Not Applicable
Recycled water production
volume (gpd): Not Applicable
A summary of historic and recent average effluent concentrations is included in Table 3, which were reported in City of Santa Maria quarterly monitoring reports. The Central Coast Water Board used reported effluent water quality data to establish the effluent and groundwater limitations in section 3.

Table 3. Effluent Water Quality for Select Constituents Constituents Unit [1][2] Historical
Average[3]
Annual Average
for 2022[4]
Carbonaceous Biochemical
Oxygen Demand, 5-Day[5] mg/L 43 45
Total Suspended Solids mg/L 39 37
Total Dissolved Solids mg/L 844 1,055
Chloride mg/L 156 143
Sodium mg/L 145 140
Sulfate mg/L 196 320
Boron mg/L 0.35 0.41
Total Nitrogen mg/L 43 42
Settleable Solids ml/L[4] <0.1 <0.1
pH Standard
Units 8 7.8
[1] mg/L denotes milligrams per liter.
[2] ml/L denotes milliliters per liter.
[3] Based on water quality data reported by City of Santa Maria in their 2018 to 2022 monitoring reports. [4] Based on water quality data reported by City of Santa Maria in the 2022 Annual Monitoring Report. [5] The City of Santa Maria has been reporting carbonaceous biochemical oxygen demand (CBOD) instead of biochemical oxygen demand (BOD). Monitoring and reporting program no. R3-2023-0032 requires the City of Santa Maria to report BOD.

3. WASTEWATER SYSTEM SPECIFIC REQUIREMENTS AND LIMITATIONS City of Santa Maria must operate the Wastewater System in accordance with the General Permit and this notice of applicability. City of Santa Maria must comply with the wastewater specific limitations specified in Table 4 through Table 8.

Flow limitations are shown in Table 4. Interim effluent limitations shown in Table 5 apply until June 16, 2025. After June 16, 2025, effluent limitations shown in Table 6 and Table 7 apply.

A. Flow Limitations:

Table 4. Flow Limitations
Flow Units Limit Point of
Compliance
Maximum Daily Flow to Disposal Ponds mgd 8.0 Influent IS-1 City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
B. Effluent Limitations:

Based on reported water quality data, effluent water quality for Carbonaceous Biochemical Oxygen Demand and Total Suspended Solids (TSS) (see Table 3) exceed the General Permit effluent limits for a trickling filter treatment system. Therefore, pursuant to the General Permit, City of Santa Maria can comply with their individual permit No. R3-2010-0001 5-day Biochemical Oxygen Demand (BOD5) and TSS limits for two years. After June 16, 2025, trickling filter effluent limitations shown in Table 6 apply.

Table 5. Interim Effluent Limitations: Trickling Filters (Until June 16, 2025) Constituent Units 30-Day
Average
Daily
Maximum
Biochemical Oxygen Demand, 5-Day mg/L 60 100
Total Suspended Solids mg/L 60 100
Settleable Solids mL/L 0.1 0.4
Total Dissolved Solids1 mg/L 1,000 Not Applicable
Sodium1 mg/L 180 Not Applicable
Chloride1 mg/L 180 Not Applicable
pH Standard
Units
Between 6.5
and 8.4
Between 6.5
and 8.4
[1] Compliance shall be based on a three-year running mean.

Table 6. Effluent Limitations[1] (After June 16, 2025)
Constituent Units 30-Day
Average
7-Day
Average
Sample
Maximum
Biochemical Oxygen
Demand, 5-Day mg/L 30 45 Not Applicable
Total Suspended Solids mg/L 30 45 Not Applicable
Settleable Solids mL/L 0.1 0.3 0.5
pH Standard
Units
Between 6.5
and 8.4
Not
Applicable Not Applicable
[1] The Central Coast Water Board understands that the City of Santa Maria will be upgrading the Wastewater System to comply with the new effluent limitations. Pursuant to General Permit Tables 3 through 5, the values in this table will vary depending on the treatment technology chosen. By June 16, 2024, the City of Santa Maria must report to the Central Coast Water Board the treatment technology chosen for the upgrades such that this notice of applicability can be updated as needed.

Table 7. Effluent Limitations (After June 16, 2025)
Based on - Upper Guadalupe Groundwater Basin
Constituents Units 25-Month Rolling Median[1]
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 105
Sulfate mg/L 500
Boron mg/L 0.5
City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Constituents Units 25-Month Rolling Median[1]
Total Nitrogen mg/L 10
[1] Rolling Median is the median from all data collected over the most recent 25 months.

C. Groundwater Limitations:

Based on review of historical effluent water quality (see Table 3), City of Santa Maria is currently unable to consistently comply with the General Permit effluent limitations for total nitrogen. The Central Coast Water Board understands that the City of Santa Maria will be designing upgrades to the Wastewater System to comply with the General Permit and will be providing a time schedule compliance plan as described in monitoring and reporting program no. R3-2023-0032. In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent. Option 1 is to comply with the effluent limits in Table 7.

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan including the limitations listed in Table 8.

Table 8. Groundwater Limitations
for Designated Groundwater Basin – Upper Guadalupe Groundwater Basin Constituents Units 25-Month Rolling Median
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 230
Sulfate mg/L 500
Boron mg/L 0.5
Total Nitrogen mg/L 1.4
City of Santa Maria - 1 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ATTACHMENT 2

FIGURES
Figure 1 - Vicinity Map
City of Santa Maria
Wastewater
Treatment Plant
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 2- City of Santa Maria Wastewater Treatment Plant Site Map City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 3 - Process Flow Schematic

CENTRAL COAST REGIONAL WATER QUALITY CONTROL BOARD
MONITORING AND REPORTING PROGRAM NO. R3-2023-0032
June 16, 2023
MODIFICATION OF MONITORING AND REPORTING PROGRAM NO. R3-2020-0020 FOR

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT

SANTA MARIA, SANTA BARBARA COUNTY
This Monitoring and Reporting Program applies to the monitoring and reporting requirements for the City of Santa Maria Wastewater Treatment Plant (Wastewater System) enrolled in General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

The City of Santa Maria owns and operates the Wastewater System that is subject to the General Permit and notice of applicability. The City of Santa Maria must not implement any changes to this monitoring and reporting program unless and until a revised monitoring and reporting program is issued by the Central Coast Regional Water Quality Control Board (Central Coast Water Board).

The State Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards are transitioning to the use of the publicly accessible State Water Board’s GeoTracker database for the tracking of environmental and regulatory data for sites that operate under waste discharge requirements. The monitoring and reporting program directs the City of Santa Maria to submit reports (both technical and monitoring reports) and analytical data electronically to the State Water Board’s GeoTracker database (see monitoring and reporting program section VI.C).

I. SAMPLING AND ANALYSIS
The City of Santa Maria must collect representative samples in accordance with the most recently approved sampling and analysis plan contained in the Operations and Maintenance Manual and validate analytical results prior to submittal to the Central Coast Water Board. All samples (e.g., wastewater, groundwater, soil, sludge) must be representative of the volume and nature of the discharge or matrix of materials sampled.

All samples must be collected by a qualified person, trained in proper procedures for collecting the samples. The name of the sampler, sample type (grab or composite), time, date, location, bottle/container type, and any preservative used for each sample must be recorded on the sample chain of custody form. The chain of custody form must also contain all custody information including date, time, and to whom samples were relinquished. If composite samples are collected, the basis for sampling (time or flow weighted) must be included in the sampling and analysis plan contained in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
2 Operations and Maintenance Manual for Central Coast Water Board review and approval.

A. Sampling Schedule – Unless otherwise specified below, sampling must be performed in accordance with Table 1.

Table 1. Sampling Schedule
Monitoring Period Sample Collection Time
Quarterly January, April, July, and October
Semiannual April and October
Annual October
Field test instruments (such as those used to evaluate pH, dissolved oxygen, and electrical conductivity) may be used if they are used by a State Water Board Environmental Laboratory Accreditation Program accredited laboratory, or:

1. The user is trained in proper use and maintenance of the instruments;

2. The instruments are field calibrated prior to monitoring events at the frequency recommended by the manufacturer;

3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; and

4. Field calibration reports are maintained and available for at least three years.

B. Monitoring Location Descriptions – All samples including influent samples (IS), effluent samples (ES), and groundwater monitoring wells (MW) must be collected at the locations described in Table 2. These locations must be consistent with the Central Coast Water Board approved sampling and analysis plan. The City of Santa Maria must upload the GeoTracker field point information for each sampling location in the GeoTracker database once, prior to uploading laboratory data (see Table 10).

Table 2. Sample Identification Details
GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Influent Sample IS-1 Raw wastewater sample collected
at the headworks
Effluent Sample ES-1
Treated wastewater sample
collected downstream of the
secondary clarifiers
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
3 GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Effluent Sample
ES-A, ES-1a, ES-2 through
ES-8, ES-11 through ES-15,
and ES-DKC
Treated wastewater sample
collected from the percolation
ponds
Monitoring Well MW-5H
Background Groundwater
Monitoring Well
Top of casing elevation unknown
Perforations 160 to 602 ft bgs
Monitoring Well MW-UMW1
Groundwater Monitoring Well
Top of Casing Elevation 175.6 ft
amsl
Screened elevations unknown
Monitoring Well MW-DMW1
Groundwater Monitoring Well
Top of Casing Elevation 158.16 ft
amsl Screened 87 to 135 ft bgs
Monitoring Well MW-DMW2
Groundwater Monitoring Well
Top of Casing Elevation 157.2 ft
amsl
Screened 82 to 155 ft bgs
Water Supply
Well
WSW-1[3] Representative sample from
potable well serving the city
[1] ft amsl denotes feet above mean sea level.
[2] ft bgs denotes feet below grade surface.
[3] Water supply sample data should be included in the annual report but does not need to be uploaded to GeoTracker if the Central Coast Water Board approves submittal of a Well Identification Number pursuant to the Water Supply Monitoring section below.

II. WATER SUPPLY MONITORING
Representative samples of the City of Santa Maria’s raw water supply (sampled before use or treatment) must be collected and analyzed, at a minimum, for constituents specified in Table 3.

In lieu of the required water supply sampling, the City of Santa Maria may request Central Coast Water Board approval to submit a Well Identification Number and the reporting year’s consumer confidence report (annual water quality report or drinking water quality report), as required by the State Water Board Division of Drinking Water and/or county, provided, at a minimum, all of the required constituents are sampled at the frequency specified in Table 3. The City of Santa Maria must report the results of any constituent monitored more frequently than is required by the monitoring program shown in Table 3. The City of Santa Maria must also report detectable concentrations (above the reporting limit) for any other constituent that has a published maximum contaminant level (MCL).

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
4 The City of Santa Maria must evaluate and provide a tabular summary of the water supply data with the annual monitoring report.

Table 3. Water Supply Monitoring
Constituent Units[1] Sample Type Sampling Frequency
Nitrate (as N) mg/L Grab Annually
Total Dissolved Solids mg/L Grab Annually
Chloride mg/L Grab Annually
Sodium mg/L Grab Annually
Sulfate mg/L Grab Annually
Boron mg/L Grab Annually
Carbonate mg/L Grab Annually
Bicarbonate mg/L Grab Annually
Calcium mg/L Grab Annually
Potassium mg/L Grab Annually
Magnesium mg/L Grab Annually
[1] mg/L denotes milligrams per liter.

III. INFLUENT AND EFFLUENT MONITORING
A. Influent Flow Monitoring – The City of Santa Maria must monitor and report flow in million gallons per day, as described in Table 4, with each monitoring report. See monitoring and reporting program section VI.A.4 for supplemental volumetric annual reporting requirements established by the State Water Board.

Table 4. Influent Flow Monitoring
Parameter Sample Type Sampling Frequency Sample Location Daily Flow Metered Daily IS-1
Maximum
Daily Flow Metered Monthly IS-1
Mean Daily
Flow Calculated Monthly IS-1
Percent of
Permitted
Flow [1]
Calculated Quarterly IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
5 [1] The General Permit notice of applicability specifies the Wastewater System’s maximum permitted flow. In the monitoring reports, the City of Santa Maria must evaluate and provide a comparison of monitored flow to the permitted flow.

B. Wastewater System Monitoring – Representative samples of The City of Santa Maria’s influent (raw wastewater) into the Wastewater System and effluent (treated wastewater) discharged to percolation ponds must be collected and analyzed in accordance with the treatment technology-based monitoring requirements (including sample type and frequency) summarized in the tables below. See Figure 1 for the location of samples and GeoTracker field points.

Figure 1. Process Flow Diagram and Sample Locations Referenced in Table 2

IS-1
ES-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
6 Figure 2. Percolation Pond and Groundwater Monitoring Well Sample Locations Referenced in Table 2

ES-2
ES-3
ES-4
ES-1a
ES-5
ES-6
ES-7
ES-8
ES-DKC
ES-12
ES-11
ES-14
ES-13
ES-15
MW-DMW1
MW-DMW2
MW-UMW1
ES-1
IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
7 Figure 3. Water Supply and Groundwater Monitoring Well Sample Locations Referenced in Table 2

1. Pond System Monitoring
i. Required Pond Monitoring – All wastewater treatment and treated wastewater storage/disposal ponds (lined and unlined) must be monitored as specified in Table 5. Sampling for dissolved oxygen must be a grab sample taken from 1 foot below pond surface1.

Observations do not need to be reported in the monitoring reports unless a violation, significant change, or treatment issue is observed. Photos of the pond(s) verifying the observations must be collected annually and included in the annual report, with the date and location of the photo clearly marked. Observations must be noted in a logbook or database and made available to the Central Coast Water Board upon request. Any problems must be promptly corrected and recorded.
1 Pond dissolved oxygen sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

MW-5H
MW-DMW2
MW-DMW1
MW-UMW1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
8 Table 5. Wastewater Treatment/Storage/Disposal Pond Monitoring Parameter/
Constituent Units Sample Type Sampling/Monitoring
Frequency
Freeboard 0.1 feet Measured Weekly
Dissolved Oxygen
(in pond)
[4] mg/L Grab Monthly
Sludge Depth[1] 0.1 feet Measured Annually
Color Not
applicable Observation Monthly
Vegetation in and
surrounding ponds
Not
Applicable Observation Monthly
Berm condition Not
Applicable Observation Monthly
Precipitation inches/day
and date Measured [2] Each precipitation event [3]
[1] Sludge depth will not be required at disposal ponds if the disposal pond was dried and scarified within the reporting year. The annual report must provide dates of when the disposal ponds have been dried and scarified.
[2] The City of Santa Maria may use a rain gauge or use a National Oceanic and Atmospheric Administration, United States Geological Survey, or California Irrigation Management Information System weather station, such as http://scacis.rcc-acis.org/. [3] A precipitation event is one producing precipitation of ½ inch or more. [4] Pond sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

2. Trickling Filter System Monitoring
i. Influent and Effluent Monitoring – At a minimum, influent and effluent constituent monitoring for the trickling filter system must be monitored as specified in Table 6.

Table 6. Influent and Effluent Monitoring for Trickling Filter Systems

INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
pH units Grab Weekly Grab Weekly
Biochemical
Oxygen Demand,
5-Day
mg/L 24-hour
composite Quarterly 24-hr composite Monthly
Total Suspended
Solids mg/L 24-hour composite Quarterly 24-hr composite Monthly Settleable Solids ml/L Not
Required Not Required Grab Weekly
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
9 INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
Total Nitrogen[2] mg/L Calculated Quarterly Calculated Monthly Nitrate (as N) +
Nitrite (as N) mg/L 24-hour composite Quarterly Grab Monthly Total Kjeldahl
Nitrogen (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Ammonia (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Total Dissolved
Solids mg/L 24-hour
composite Quarterly Grab Monthly
Chloride mg/L 24-hour
composite Quarterly Grab Monthly
Sodium mg/L 24-hour
composite Quarterly Grab Monthly
Sulfate mg/L 24-hour
composite Quarterly Grab Monthly
Boron mg/L Not
Required Not Required Grab Monthly
Carbonate mg/L Not
Required Not Required Grab Semiannually
Bicarbonate mg/L Not
Required Not Required Grab Semiannually
Calcium mg/L Not
Required Not Required Grab Semiannually
Potassium mg/L Not
Required Not Required Grab Semiannually
Magnesium mg/L Not
Required Not Required Grab Semiannually
[1] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.

IV. SLUDGE/BIOSOLIDS DISPOSAL MONITORING
The City of Santa Maria must report the handling and disposal of all sludge/biosolids generated at the Wastewater System. Records must include the date removed from the Wastewater System, name/contact information for the hauling company, the type and volume of waste transported, the disposal facility name and address, and copies of analytical data required by the entity accepting the waste. These records must be submitted as part of the annual monitoring report.

The City of Santa Maria must also monitor sludge/biosolids consistent with a Central Coast Water Board approved sludge management plan and in accordance with the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
10 requirements specified by the receiving party, including a regulated landfill and/or regulated composting facility.

If sludge/biosolids are not removed during the year, the City of Santa Maria must explain the absence of this monitoring in the annual report.

V. GROUNDWATER MONITORING
A. General Permit section V.A.2 provides two choices for compliance, effluent limitations, or groundwater monitoring.

In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent.

Option 1 is to comply with the effluent limits (refer to notice of applicability Table 7).

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan (refer to notice of applicability Table 8).

Existing upgradient and downgradient groundwater monitoring wells are located within the percolated effluent mound at the Wastewater System. The current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trend for the City of Santa Maria Wastewater System (Fugro 2007)2.

By June 16, 2024, (with the time schedule compliance plan) the City of Santa Maria must notify the Central Coast Water Board of the city’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).

If the City of Santa Maria chooses Option 2 for any constituent, by October 16, 2024, the City of Santa Maria must:

1. Submit a groundwater monitoring workplan and preliminary hydrogeologic conceptual site model for Central Coast Water Board approval. At a minimum, the workplan must propose the installation of three shallow groundwater monitoring wells to establish groundwater gradient, groundwater flow velocity and direction, and evaluate downgradient groundwater quality influenced by the wastewater disposal. The number and location of the proposed groundwater monitoring well network must be on a scale sufficient to determine potential impacts and be sufficiently representative of groundwater conditions upgradient and downgradient of the permitted disposal/dispersal area. The groundwater 2 Hydrogeologic and Water Quality Review of Groundwater Conditions for the Wastewater Treatment Plant, Santa Maria, California. Fugro West, Inc. September 2007 MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
11 monitoring wells should not be installed prior to Central Coast Water Board approval of the groundwater monitoring workplan and preliminary hydrogeologic conceptual site model.

The groundwater monitoring wells must be installed within first encountered groundwater and in accordance with California Department of Water Resources Bulletin No. 74-81 and Supplement No. 74-90, California Water Code sections 13710 through 13755, and any local permitting requirements. The locations and top-of-casing elevations for the newly installed monitoring wells must be surveyed by a licensed land surveyor. The City of Santa Maria must install3 the Central Coast Water Board approved groundwater monitoring well network within 90 days of receiving Central Coast Water Board approval.

2. Once installed, all monitoring wells designated as part of the monitoring well network must be, at a minimum, sampled and analyzed as specified in Table 7 and the Central Coast Water Board approved sampling and analysis plan (see section VI.A.2.i of the General Permit).

Prior to sampling, depth to groundwater must be measured and groundwater elevations4 must be calculated. The monitoring wells must be purged of at least three well volumes and until measurements of the following parameters have stabilized (i.e., are reproducible within 10 percent): pH, temperature, dissolved oxygen, electrical conductivity, and turbidity. No-purge, low-flow, or other sampling techniques are acceptable only if they are approved in advance by the Central Coast Water Board and described in an approved sampling and analysis plan. Once the groundwater level in each of the wells has recovered sufficiently to ensure the collection of representative groundwater samples, a qualified individual (e.g., consultant, technician) trained in using proper sampling methods must recover samples using approved USEPA methods. Laboratories analyzing groundwater samples must be accredited by the State Water Board Environmental Laboratory Accreditation Program, in accordance with California Water Code section 13176, and must include quality assurance/quality control data with their reports.

The City of Santa Maria must provide monitoring well field sheets and report monitoring data, as described in Table 7, with each monitoring report.

3. Groundwater monitoring must include and must be consistent with Table 7 if Option 2 is chosen. Some constituents in Table 7 may be removed by the Central 3 Well installation must be supervised by a California licensed Civil Engineer or Professional Geologist. 4 The locations and top-of-casing elevations for the existing groundwater monitoring wells must be surveyed by a licensed land surveyor if not already completed at the time of installation.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
12 Coast Water Board if compliance for that constituent is chosen by the City of Santa Maria to be an effluent limitation.

Table 7. Groundwater Monitoring if Option 2 is Chosen
Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation [1] 0.01 ft amsl Calculated Quarterly Depth to Groundwater [1] 0.01 ft bgs Measurement Quarterly Gradient feet/feet Calculated Quarterly
Groundwater Flow Direction [2] degrees Calculated Quarterly Total Nitrogen[3] mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Total Dissolved Solids mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
Carbonate mg/L Grab Semiannually
Bicarbonate mg/L Grab Semiannually
Calcium mg/L Grab Semiannually
Potassium mg/L Grab Semiannually
Magnesium mg/L Grab Semiannually
pH pH Units Metered Quarterly
Dissolved Oxygen mg/L Metered Quarterly
Phenol [4] mg/L Grab Annual
Formaldehyde [4] mg/L Grab Annual
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
13 Constituent Units Sample
Type
Sampling
Frequency
Zinc [4] mg/L Grab Annual
[1] ft amsl denotes feet above mean sea level and ft bgs denotes feet below ground surface. [2] Calculations must be prepared by, or under the responsible charge of, a California licensed professional.
[3] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.
[4] Sampling required once every five years if not detected in initial sample.

4. Groundwater monitoring reports, workplans, and other technical reports that interpret groundwater data must be prepared and stamped by a California licensed civil engineer or professional geologist.

B. GROUNDWATER MONITORING PRIOR TO OCTOBER 16, 2024
Table 8. Groundwater Monitoring Prior to October 16, 2024 Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation 0.01 ft amsl Calculated Quarterly Depth to Groundwater 0.01 ft bgs Measurement Quarterly
Total Nitrogen mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
VI. REPORTING REQUIREMENTS
A. QUARTERLY AND ANNUAL MONITORING REPORTS
Quarterly and annual monitoring reports are due as described in Table 9.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
14 Table 9. Quarterly and Annual Monitoring Reporting
Report Monitoring Period Report Due Date
First Quarter Monitoring
Report January 1 to March 31 May 1
Second Quarter Monitoring
Report April 1 to June 30 August 1
Third Quarter Monitoring
Report July 1 to September 30 November 1
Fourth Quarter Monitoring
Report October 1 to December 31 February 1
Annual Monitoring Report January 1 to December 31 March 1 Annual Pretreatment
Program Report January 1 to December 31 March 1
State Water Board
Volumetric Annual
Reporting
January 1 to December 31 April 30

1. Quarterly Monitoring Reporting – At a minimum, the quarterly reports must include:
i. Results of all required monitoring in tabular format. ii. The results of any pollutant or parameter monitored more frequently than is required by this monitoring program. Values obtained through additional monitoring must be used in calculations as appropriate. iii. A comparison of monitoring data to the discharge specifications, applicable effluent limitations, disclosure of any violations of the notice of applicability and/or General Permit, and an explanation of any violation of those requirements. The City of Santa Maria must calculate 7-day averages, 30- day averages and 25-month rolling medians for select analytes when comparing monitoring data to applicable effluent limitations specified in the General Permit. Data must be presented in tabular format. iv. Copies of laboratory analytical report(s) and chain of custody form(s). v. An updated hydrogeologic conceptual site model with the groundwater monitoring reporting requirements based on new information generated from the monitoring well boring logs, groundwater elevation data, and water quality data.
vi. Copies of groundwater monitoring well field sheets with purge methods and data.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
15 2. Annual Monitoring Reporting – The City of Santa Maria must submit annual reports in compliance with Standard Provisions 20135, (and any updates to the Standard Provisions) Section C, General Reporting Requirements, Item 16 using the most recent annual report template provided by Central Coast Water Board.

The current annual report template can be found here:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf

3. Annual Pretreatment Program Report – Pursuant to California Code of Regulations, title 23, section 2233, subdivision (a), because the City of Santa Maria’s Wastewater System is designed to treat over five million gallons a day, the city must have and enforce an adequate pretreatment program approved by the Central Coast Water Board. The City of Santa Maria’s Pretreatment Program was approved by the Environmental Protection Agency (EPA) in 1982. The Pretreatment Program monitors compliance of permitted facilities and attempts to identify and reduce pollutants to both sanitary and stormwater collection systems.

On occasion, there may be a need to modify an existing pretreatment program, as identified by either the City of Santa Maria or the Central Coast Water Board.

These modifications may be driven by a variety of factors such as, but not limited to, a change in conditions at the Wastewater System, a recalculation of local limits (or reallocation of the maximum allowable industrial loading), changes to federal pretreatment regulations, or a change in the industrial user base discharging to the Wastewater System. Substantial modification is defined in title 40 Code of Federal Regulations (CFR) 403.18(b).

For substantial modifications, the City of Santa Maria must submit in writing to the Central Coast Water Board the rationale for the substantial modification, a detailed description of the proposed modification, and other documents considered necessary by Central Coast Water Board staff.

The City of Santa Maria must submit an annual Pretreatment Program report in accordance with title 40 CFR 403.12(i) that describes the City of Santa Maria’s pretreatment program activities, including activities of all participating agencies, if more than one jurisdiction is involved in the program. The report must include, at a minimum, the applicable required data in appendix A to 40 CFR part 127 which requires the following data to be added or updated annually:
i. Pretreatment program approval or modification date
5 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/docs/wdr_standard_provi sions_2013.pdf
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
16 ii. Pretreatment program modification type
iii. Industrial user type
iv. Significant industrial user subject to local limits v. Significant industrial user subject to local limits more stringent than categorical standards
vi. Significant industrial user wastewater flow rate
vii. Industrial user causing problems at the Wastewater System viii. Receiving resource conservation and recovery act (RCRA) waste ix. Receiving remediation waste
The report must also include a summary of changes to the City of Santa Maria’s pretreatment program that have not been previously reported to the Central Coast Water Board and any other relevant information requested by the Central Coast Water Board.

4. State Water Board Volumetric Annual Reporting – The City of Santa Maria must electronically certify and submit a summary of the monthly influent and effluent flow volume by April 30th of each calendar year via the State Water Board’s Internet GeoTracker database.6
The following information is required:
i. Monthly volume of wastewater collected and treated by the wastewater treatment plant (i.e., total monthly influent volume).
ii. Monthly volume of wastewater treated, specifying level of treatment, including treated wastewater discharged.
iii. If applicable, monthly volume of recycled water distributed, and annual volume of treated wastewater distributed for beneficial use in compliance with California Code of Regulations, title 22 use categories.

Additional information about volumetric annual reporting of wastewater and recycled water and the Recycled Water Policy is available at the Recycled Water Policy Volumetric Annual Reporting Website7.
6 See: https://geotracker.waterboards.ca.gov/
7 See: Volumetric Annual Reporting | California State Water Resources Control Board MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
17 B. NON-COMPLIANCE REPORTING:

The City of Santa Maria must notify and report to Central Coast Water Board noncompliance of limits related to pond freeboard, flow rate, bypass or overflow, and wastewater containment failure, pursuant to General Permit section VI.C.2.

C. ELECTRONIC GEOTRACKER SUBMITTAL
All monitoring reports must be provided electronically in a searchable PDF format, with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed.
https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater_permi tting/docs/transmittal_sheet.pdf
The City of Santa Maria must submit all reports/documents and laboratory analytical data to the State Water Board’s GeoTracker8,9 database consistent with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System-specific global identification number WDR100029526 at:
https://geotracker.waterboards.ca.gov/esi/login
For general questions, please contact the GeoTracker Help Desk at:

[email protected].

Table 10 summarizes all the GeoTracker electronic reporting requirements. Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

Table 10. GeoTracker Electronic Submittal Information Data Requirements Electronic
Submittal Description of Action Action Frequency
8 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/docs/beginnerguide2.pdf 9 Additional information available at:
https://geotracker.waterboards.ca.gov/
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
18 Electronic
Submittal Description of Action Action Frequency
Reports and
Documents
Complete copy of all
documents including
monitoring reports (in
searchable PDF format) and
any other associated
documents related to the
Wastewater System.

Upload directly to
GeoTracker all
monitoring reports (in
searchable PDF
format) and any
other associated
documents.

On or before the due
dates required by this
General Permit and for
other documents when
required by the Central
Coast Water Board.

Laboratory
Data
All analytical data (including
geochemical data) in
electronic deliverable format
(EDF). This includes all
water, soil, and vapor
samples collected when
monitoring a discharge.

Upload, or direct
your California
ELAP-accredited
laboratory staff to
upload, all EDF
laboratory data
directly to
GeoTracker.

On or before the due
date of the required
monitoring report.

Depth to
Groundwater
Monitoring wells must have
the depth-to-water
information reported. Report
data only for wells defined as
permanent sampling points.

Upload depth-to-water information to
the GeoTracker
GEO_WELL file.

On or before the due
date of the required
monitoring report.

Boring Logs
and Well
Screen
Intervals
Boring logs must be prepared
by a registered professional
and submitted in PDF format
separately (not only as
attachments to reports).

Upload boring logs
(in searchable PDF
format) to
GeoTracker
GEO_BORE file
whenever a new
boring is drilled.

Every time a new
boring is drilled.

Field Points,
Location Data
(Geo XY)[1]
Name, classify, and identify
the location (latitude and
longitude) of all sampling
points. Monitoring wells must
be surveyed, influent and
effluent sample locations
must be identified on the
GeoTracker mapping tool
under “non-surveyed data.”
These data points are
required prior to laboratory
data uploads.

Upload the location
data (surveyed and
non-surveyed) to the
GeoTracker Geo_XY
file.

Every time a
permanent monitoring
point is established.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
19 Electronic
Submittal Description of Action Action Frequency
Elevation
Data
(Geo Z)[2]
Survey and mark the
elevation at the top of
groundwater well casings for
all permanent groundwater
wells. These points are
required prior to depth-to-water data uploads.

Upload the survey
data to the
GeoTracker GEO_Z
file.

One-time, for all
groundwater
monitoring wells.

Geo Map
Site layout, map of facilities,
Wastewater System including
treatment and disposal
area(s).

Upload the Site
layout PDF to the
GeoTracker site plan
file.

Year one and every
five years thereafter
and when the facilities
are modified.
[1] Geo XY required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data. The City of Santa Maria must also upload sample locations (e.g., influent and effluent samples) that are not defined as a permanent monitoring well and have not been surveyed by a licensed professional.
[2] Geo Z required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data.

VII. TECHNICAL REPORTS
The technical reports are due as described in Table 11.

Table 11. Technical Report Submittal Due Dates
Report Report Due Date
Operations and Maintenance Manual June 16, 2024
Climate Change Adaptation Plan June 16, 2025
Salt and Nutrient Management Plan Not Applicable
Time Schedule Compliance Plan June 16, 2024
Groundwater Monitoring Plan[1] October 16, 2024
[1] Required if the City of Santa Maria chooses Option 2 described in section V.A.

1. Operations and Maintenance Manual – In addition to the required components specified in Standard Provisions10 A.12 and A.28 (and any updates to the 10 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/do-cs/wdr_standard_provisions_2013.pdf MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
20 Standard Provisions) and General Permit section VI.A.2, the Operations and Maintenance Manual must contain the following components. Each component must contain an implementation schedule and identification of adequate funding to implement the component.
i. Sampling and Analysis Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sampling and analysis plan that meets the requirements specified herein. Anyone performing sampling on behalf of the City of Santa Maria must be familiar with the sampling and analysis plan. At a minimum, the sampling and analysis plan must contain the following:
a. A wastewater treatment process flow schematic with the monitoring locations labeled and scaled Wastewater System maps with treatment components, discharge locations (both treated wastewater and non-potable recycled water), monitoring locations, groundwater wells, storage locations (e.g., chemical, sludge, emergency overflow ponds), and buildings. If the City of Santa Maria needs to update Figure 1 to comply with this requirement, a copy of the updated process flow schematic will also be included with the annual report. b. Sample identification details in tabular format. The table must include the sample titles, GeoTracker field point information, sample description(s), and sampling frequencies.
c. Sample chain-of-custody procedures and documentation. d. Sample handling/preservation procedures.
e. A description of the analytical methods.
f. A description of sample containers, preservatives, and holding times. g. For water supply monitoring, a description of the location and method of data collection (e.g., onsite well sampling, use of consumer confidence report).
h. For groundwater monitoring, a description of the well purging and field methods.
ii. Sludge Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sludge management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the plan must describe the following:

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
21 a. An estimated volume/amount and quality of sludge and scum that will be generated.
b. How sludge, scum, and supernatant will be stored and disposed of to protect groundwater quality.
c. If sludge will be subject to further treatment, describe the treatment and storage requirements.
d. Procedures for cleaning of digesters or storage vessels and the treatment and disposal of the residuals. If drying of residuals is planned, describe how that will be performed to prevent nuisance odors, prevent vectors, and protect groundwater quality. iii. Wastewater Disposal Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a wastewater disposal management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the wastewater disposal management plan must include:
a. A description of the wastewater disposal area and a map denoting acreage.
b. Loading calculations based on flow volumes, applied acreage, and biochemical oxygen demand, salts (total dissolved solids, sodium, chloride, sulfate, boron), and nitrogen analytical results. c. A description of wastewater disposal and water quality protection practices.
iv. Spill Prevention and Emergency Response Plan –The City of Santa Maria’s Operation and Maintenance Manual must contain a spill prevention and emergency response plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. The spill prevention and emergency response plan must describe operation and maintenance activities to prevent accidental releases of wastewater and to effectively respond to such releases and minimize the environmental impact. At a minimum, the spill prevention and emergency response plan must address the following:
a. Operation and Control of Wastewater System - A description of the wastewater treatment equipment, operational controls, flow measurement and calibration procedures, and treatment system schematic including valve/gate locations.
b. Sludge Handling - A description of the sludge handling equipment, operational controls, and disposal procedures.
c. Collection System Maintenance - A description of collection system cleaning and maintenance, equipment tests, and alarm functionality tests to minimize the potential for wastewater spills originating in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
22 collection system or headworks. For collection systems subject to State Water Board Order WQ 2022-0103-DWQ, Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (or its replacement), reports prepared to comply with State Water Board Order WQ 2022-0103-DWQ satisfy this requirement.
d. Emergency Response - A description of emergency response procedures including for emergencies such as power outage, severe weather, flooding, or inadequate freeboard (for systems with wastewater treatment, storage, or disposal ponds or treated non-potable recycled water storage ponds). An equipment and telephone list for contractors/consultants, emergency personnel, and equipment vendors.
e. Finance - At a minimum, discuss current fees, projected fees, current budget for spill prevention and emergency response, projected budget for spill prevention and emergency response.
f. Notification Procedures - Coordination procedures with fire, police, Governor’s Office of Emergency Services (CalOES), Central Coast Water Board, and local county health department personnel. v. Training Records Log – The City of Santa Maria’s Operation and Maintenance Manual must contain updated training records logs that demonstrate the City of Santa Maria is complying with General Permit section VI.B.3.

2. Climate Change Adaptation –The Climate Change Adaptation Plan must, at a minimum, include the following components:
i. Hazards and Vulnerabilities – Identify climate change hazards, at a minimum accounting for the hazards listed below, applicable to the Wastewater System. Using up-to-date tools, data, and guidance from the State of California (e.g., Cal-Adapt11, Sea-Level Rise Guidance from Ocean Protection Council, reports from the Climate-Safe Infrastructure 11 Cal-Adapt is an online resource with downscaled climate project data. It provides users with projections and more detailed downloadable data supporting a range of needs and array of climate models and emissions scenarios. Cal-Adapt offers climate projections for the major stressors facing California, including the following: temperature averages and extremes, precipitation averages and extremes, sea-level rise, wildfires, and drought. The Governor’s Office of Planning and Research (OPR) recommends agencies use Representative Concentration Pathway (RCP) 8.5 for analyses considering impacts through 2050, because there are minimal differences between emissions scenarios during the first half of the 21st century.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
23 Working Group, the Climate Adaptation Planning Guide, and California Climate Assessment Regional Reports), assess the Wastewater System’s vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the Wastewater System. Identify and justify the resources (e.g., models and tools, design parameters) used to inform identification of these hazards and vulnerabilities.
a. Sea Level Rise – Saltwater intrusion, flooding and inundation, and increased coastal erosion.
b. Precipitation Pattern Changes.

I. Drought – Decreased influent quantity and quality.

II. Peak Events – Flooding and increased influent quantity. c. Temperature fluctuations and extremes.
d. Increased wildfires.
e. Increased power outages.
ii. Resiliency Actions – Identify actions to build Wastewater System and operational resilience to identified vulnerabilities, accounting for options that minimize resource impacts.
iii. Adaptation Strategy – For Wastewater Systems with design flows over 1,000,000 gallons per day, develop and implement a strategy to complete resiliency actions, at a minimum encompassing the following:
a. Prioritization – Prioritized resiliency actions based on risks to water quality, but also accounting for costs and benefits.
b. Schedule and Milestones – Timeframes to complete prioritized resiliency actions and/or climate change hazard triggers to inform when the City of Santa Maria must implement actions. Milestones to complete critical steps for prioritized resiliency actions, designed to demonstrate measurable progress at a steady, or accelerated, completion pace over the established timeframes.
c. Financial Planning – Projected costs necessary to implement and sustain resiliency actions and strategy to procure funds. iv. Recycled Water Feasibility Plan – Dischargers with Wastewater System design flows over 1,000,000 gallons per day must include a recycled water feasibility plan.

The recycled water feasibility plan will assess the viability of using the Wastewater System’s treated wastewater effluent for beneficial reuse including, but not limited to the following:
a. Beneficial Reuse Options – Identification of reuse opportunities for the City of Santa Maria’s treated effluent that would achieve the highest beneficial impact and best uses possible of non-potable recycled MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
24 water. Include assessment of the following non-potable recycled water benefits identified in the State Water Board Recycled Water Policy:
providing safe alternatives to fresh water or potable water for approved uses; supporting sustainable groundwater and surface water uses with the intent of substituting use of treated effluent for use of fresh water or potable water; and diversifying community water supplies and mitigating for the impacts of climate change.12
b. Viable Users – Identification and viability evaluation of all potential users of the Wastewater System’s treated effluent associated with identified beneficial reuse options. The City of Santa Maria must demonstrate it engaged potential water purveyors and customers about the viability of reusing the Wastewater System’s treated effluent. c. Infrastructure Upgrades – Assessment of infrastructure needs to produce non-potable recycled water for identified beneficial reuses and convey non-potable recycled water to beneficial reuse locations. d. Fiscal Analysis – Cost estimates for identified reuse options, at a minimum including project development, construction, and long-term maintenance and lifecycle costs. This analysis shall also include identification and evaluation of the following: 1) funding options, including at a minimum, revenues from recycled water sales, grant and loan funding opportunities, and financing from other benefitting parties and 2) funding limitations.
e. Schedule and Milestones for Next Steps – Timeframes to assess the feasibility of identified beneficial reuse options and to identify proposed beneficial reuse options based on prioritized water recycling and reuse opportunities, feasibility assessments, and other factors identified by the City of Santa Maria.
f. Identification of implementation schedule and adequate funding to implement the plan.

3. Salt and Nutrient Management Plan – The City of Santa Maria is an active cooperating partner of the Santa Barbara County Integrated Regional Water Management (IRWM) Plan’s regional water management group. The regional water management group prepared and submitted an assessment of the Santa Maria Valley Groundwater basin to the Central Coast Water Board. The assessment concluded that the dischargers participating in the workgroup were in balance for salts and nutrients in 2013. A salt and nutrient management plan is 12 Water Quality Control Policy for Recycled Water, State Water Board, adopted December 11, 2018, page 1.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
25 currently not required while the City of Santa Maria participates in the Santa Barbara County IRWM regional water management group.

4. Time Schedule Compliance Plan - As set forth in General Permit sections V.A and VI.A.5, if the City of Santa Maria anticipates that additional time is needed to achieve compliance with the effluent limitations, the City of Santa Maria must prepare and submit for Central Coast Water Board review and approval, a time schedule compliance plan. At a minimum, the time schedule compliance plan must address the following:
i. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3-6.
ii. Identification of the City of Santa Maria’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).
iii. A detailed description and chronology of efforts, since issuance of the notice of applicability, to reduce wastes.
iv. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3-6.
v. A detailed time schedule of specific actions the City of Santa Maria will take to achieve the effluent limitations.
vi. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).
vii. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).

VIII. LEGAL REQUIREMENTS
The Central Coast Water Board’s requirements that the City of Santa Maria submit the technical and monitoring reports described in this monitoring and reporting program are made pursuant to section 13267 of the California Water Code. Failure to submit reports in accordance with schedules established by this General Permit and notice of applicability with attachments or failure to submit a report of sufficient technical quality to be acceptable to the Central Coast Water Board may subject the City of Santa Maria to enforcement action pursuant to section 13268 of the California Water Code. Pursuant to section 13268 of the Water Code, a violation of a request made pursuant to section MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
26 13267 may subject the City of Santa Maria to civil liability assessment of up to $1,000 per day in which the violation occurs.

The Central Coast Water Board needs the required information to ensure compliance with the notice of applicability and the General Permit. The City of Santa Maria is required to submit this information because it is subject to the General Permit and is responsible for the discharge.

The burden, including costs, of the reports bears a reasonable relationship to their need and the benefits to be obtained. The requirement for the reports is necessary to ensure compliance with the General Permit, notice of applicability, and monitoring and reporting program to protect water quality.

The City of Santa Maria must implement the above monitoring program on October 1, 2023. The Central Coast Water Board may rescind or modify this monitoring and reporting program at any time.

Ordered By:
for Matthew T. Keeling
Executive Officer
\\ca.epa.local\RB\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\Order 2020-0020\final\Santa Maria_MRP_ R3-2023-0032_final.docx Jennifer Epp Digitally signed by Jennifer Epp
Date: 2023.06.15 16:19:04
-07'00'
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX I TIME SCHEDULE COMPLIANCE PLAN

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan

TECHNICAL MEMORANDUM
Time Schedule Compliance Plan
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan

TECHNICAL MEMORANDUM
Time Schedule Compliance Plan
FINAL / October 2026
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:16:19-07'00'
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.21 18:18:03-07'00'

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Time Schedule Compliance Plan/TimeScheduleCompliancePlan.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Background 1

1.1.1 Purpose of This Report 1
SECTION 2 COMPARISON OF EFFLUENT QUALITY TO EFFLUENT AND GROUNDWATER LIMITS 2

2.1 Effluent Quality 2

2.1.1 Carbonaceous Biochemical Oxygen Demand and 5-Day Biochemical Oxygen Demand Test 3

2.1.2 Total Suspended Solids 3

2.1.3 Settleable Solids 4

2.1.4 Total Nitrogen 4

2.1.5 Total Dissolved Solids, Sodium, Chloride, Sulfate, and Boron 5

2.2 Groundwater Quality 7
SECTION 3 IDENTIFICATION OF CHOICE OF COMPLIANCE LOCATION 11 SECTION 4 DESCRIPTION AND CHRONOLOGY OF EFFORTS SINCE NOTICE OF APPLICABILITY 12

4.1 Summary of Investigations 12

4.1.1 Sampling Plan and Data Collection 12

4.1.2 Process Modeling and Optimization Identification 13

4.1.3 Source Control Evaluation 14

4.1.4 Percolation Pond Investigations and Improvements 14

4.2 Further Investigation 15
SECTION 5 JUSTIFICATION OF NEED FOR ADDITIONAL TIME AND DETAILED SCHEDULE OF ACTIONS 15

5.1 Proposed Actions 15

5.2 Justification for Schedule 16

5.3 Detailed Time Schedule of Specific Actions 18
SECTION 6 DEMONSTRATION THAT TIME SCHEDULE IS AS SHORT AS POSSIBLE 18
SECTION 7 PROPOSED INTERIM LIMITS, ACTIONS, AND MEASURABLE MILESTONES 19

7.1 Proposed Interim Limits 19

7.2 Actions and Measurable Milestones 20

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Tables
Table 1 Comparison of Permit Limits and Current Effluent Concentrations 2 Table 2 Groundwater Quality Data (Average From 2018 to 2023) 8 Table 3 City of Santa Maria Proposed Interim WWTP Effluent Limits 19 Table 4 Proposed Time Schedule Tasks and Milestones 20
Figures
Figure 1 Comparison of Effluent CBOD and BOD₅ to NOA Limits 3 Figure 2 Comparison of Effluent TSS to NOA Limits 4
Figure 3 Comparison of Effluent Total Nitrogen to NOA Limit for Total Nitrogen 5 Figure 4 Comparison of Effluent TDS to NOA Limits 6
Figure 5 Comparison of Effluent Sodium, Chloride, and Sulfate to NOA Limits 6 Figure 6 Comparison of Effluent Boron to NOA Limits 7
Figure 7 TDS Values in the Groundwater Compared to NOA Limit 8 Figure 8 Sodium Values in the Groundwater Compared to NOA Limit 9 Figure 9 Chloride Values in the Groundwater Compared to NOA Limit 9 Figure 10 Sulfate Values in the Groundwater Compared to NOA Limit 10 Figure 11 Boron Values in the Groundwater Compared to NOA Limit 10 Figure 12 Total Nitrogen Values in the Groundwater Compared to NOA Limit 11 Figure 13 Timeline for Determining Approach for Interim and Final Limit Compliance 18 Figure 14 Timeline for Implementation of Project for Final Compliance 18

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
BOD₅ 5-day biochemical oxygen demand test
Carollo Carollo Engineers, Inc.

CBOD carbonaceous biochemical oxygen demand
CEPT chemically enhanced primary treatment
CEQA California Environmental Quality Act
City City of Santa Maria
COD chemical oxygen demand
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
NOA Notice of Applicability
PTF primary trickling filter
RWQCB Regional Water Quality Control Board
STF secondary trickling filter
TBD to be determined
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TN total nitrogen
TSCP Time Schedule Compliance Plan
TSS total suspended solids
VSS volatile suspended solids
WWTP wastewater treatment plant

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION

1.1 Background
The City of Santa Maria (City), California treats domestic, commercial, and industrial wastewater from its service area which serves a population of more than 107,000. The treatment process includes primary clarifiers, trickling filters, secondary clarifiers, and then discharge of the treated wastewater to land via percolation ponds. This discharge is permitted by the Central Coast Regional Water Quality Control Board (RWQCB). In September 2020, the RWQCB adopted a General Waste Discharge Requirements Order (No. R3-2020-0020). The City enrolled in this General Order through submitting a notice of intent on August 5, 2022. The RWQCB issued a Notice of Applicability (NOA) to the City on June 16, 2023, which lays out specific requirements, effluent limitations, and the Monitoring and Reporting Program requirements. As part of the NOA, the City is required to develop a Time Schedule Compliance Plan (TSCP) if additional time is needed to comply with the new effluent limits. Per the NOA, the TSCP must address the following:

1. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3 to 6.

2. Identification of the City’s choice for compliance for each constituent pursuant to General Permit Section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).

3. A detailed description and chronology of efforts, since issuance of the NOA, to reduce wastes.

4. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3 to 6.

5. A detailed time schedule of specific actions the City will take to achieve the effluent limitations.

6. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).

7. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).

1.1.1 Purpose of This Report
The City will not be able to implement new treatment processes in time to comply with the final effluent limits by June 2025. Therefore, the purpose of this report is to address each of the items set out above.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
SECTION 2 COMPARISON OF EFFLUENT QUALITY TO

EFFLUENT AND GROUNDWATER LIMITS
This section lays out in more detail how the City’s effluent quality compares to the requirements of the NOA effluent and groundwater limits for each of the major constituents.

2.1 Effluent Quality
A summary of the current permit limits compared to the City’s effluent is shown in Table 1. As indicated in Table 1, the City will have issues complying with the 5-day biochemical oxygen demand test (BOD₅), total suspended solids (TSS), and total nitrogen (TN). Additionally, total dissolved solids (TDS) concentrations have been increasing. Each of these constituents are discussed in more detail below.

Table 1 Comparison of Permit Limits and Current Effluent Concentrations Constituent Units Interim Limits Through
June 16, 2025 Based on
General Order
No. R3-2010-0001
Final Limits as of
June 16, 2025 Based on
New General Order
No. R3-2020-0020
Average Effluent
2018 to 2023(1)
BOD₅(1) mg/L 60 30 44.4 CBOD(2,3)

70.1 BOD₅(2,3)
TSS(1) mg/L 60 30 38.6
Settleable Solids(1) mL/L 0.1 0.3(4) <0.1
TN(5) mg/L – 10 42
TDS(5) mg/L 1,000 1,000 884
Sodium(5) mg/L 180 230(6) 140
Chloride(5) mg/L 180 165 150
Sulfate(5) mg/L – 500 227
Boron(5) mg/L – 0.5 0.37
Notes:

CBOD - carbonaceous biochemical oxygen demand; mg/L - milligrams per liter; mL/L - milliliters per liter (1) Based on a 30-day average.
(2) Values shown in red indicate which constituents cannot comply with either the interim or final effluent limit. (3) The City historically measured CBOD rather than BOD₅ for compliance. CBOD value shown is an average of 2018 to 2023.

BOD₅ value is an average of 24 samples collected in fall of 2023 and early 2024. (4) The settleable solids limit shown in the NOA is not consistent with General Order No. R3-2020-0020. The NOA states effluent limits are 0.1 mL/L as a 30-day average while the General Order establishes limits as 0.3 mL/L as a 30-day average. The General Order value is shown above.
(5) Based on 25-month rolling median.
(6) The sodium limit shown in the NOA is not consistent with General Order No. R3-2020-0020. The NOA states effluent limits are 105 mg/L as a 25-month rolling median while the General Order establishes limits as 230 mg/L as a 25-month rolling median. The General Order value is shown above.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3

2.1.1 Carbonaceous Biochemical Oxygen Demand and 5-Day Biochemical Oxygen Demand Test
The City historically measured effluent using CBOD, as opposed to BOD₅. The NOA requires use of BOD₅.

Figure 1 shows the historical CBOD effluent values collected since 2018 compared to the interim and final NOA effluent limits. Recent data using BOD₅ is also shown for samples collected in fall 2023. Based on sampling conducted at the City’s wastewater treatment plant (WWTP), CBOD values are typically 45 percent of BOD₅ values. For this reason, as seen in Figure 1 that while the historical CBOD values are typically less than 60 mg/L, use of the BOD₅ method means that the effluent discharge cannot comply with the interim limit of 60 mg/L as a 30-day average, nor the final limit of 30 mg/L as a 30-day average.

Reduction of BOD₅ to reliably meet the lower final effluent limits will likely require additional treatment and/or transitioning away from trickling filters to activated sludge.

Figure 1 Comparison of Effluent CBOD and BOD₅ to NOA Limits

2.1.2 Total Suspended Solids
TSS has an interim limit of 60 mg/L and a final limit of 30 mg/L measured as a 30-day average. As shown in Figure 2, the WWTP effluent is normally under 60 mg/L but is not always able to comply with the 30 mg/L limit. The City is evaluating ways to improve TSS removal, but transitioning away from trickling filters to activated sludge would lead to a more stable secondary effluent discharge.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
Figure 2 Comparison of Effluent TSS to NOA Limits

2.1.3 Settleable Solids
The City’s effluent achieves both the interim and final limit of settleable solids of 0.1 mL/L.

2.1.4 Total Nitrogen
The NOA establishes that the effluent shall not exceed a TN limit of 10 mg/L as a 25-month rolling median. As shown in Figure 3, the sum of the nitrogen species (ammonia, nitrate, and nitrite) far exceeds the total limit of 10 mg/L. Reduction of TN will require new treatment processes as the existing facility was not designed for nutrient removal and is not easily modified to meet these nitrogen limits.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
Figure 3 Comparison of Effluent Total Nitrogen to NOA Limit for Total Nitrogen

2.1.5 Total Dissolved Solids, Sodium, Chloride, Sulfate, and Boron For the protection of the Upper Guadalupe Groundwater Basin, the NOA establishes effluent limits for a number of compounds that are not typically removed by primary and secondary treatment, such as TDS, sodium, chloride, sulfate, and boron. All of these compounds are largely influenced by the source water quality used for the potable water supply. In the case of the City, water supply is a combination of local groundwater sources and imported State Water Project water (surface water from the delta). The compliance for these effluent limits are based on a 25-month rolling median. Because the treatment plant’s influent flow is more than 90 percent domestic in origin, and industrial discharges only account for about 4.2 percent of the influent salinity, the ability to comply with any of these constituents will largely depend on the quality of the drinking water supplies.

The final effluent limit for TDS is 1,000 mg/L, as shown in Figure 4 (solid blue line). Figure 4 also shows the 25-month rolling median of the historical effluent TDS values (dotted blue line) that comply most of the time with the new limit, with a few exceedances in 2022.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 Comparison of Effluent TDS to NOA Limits
Figure 5 shows the historical effluent values for sodium, chloride, and sulfate, whose final effluent limits are 230 mg/L, 165 mg/L, and 500 mg/L, respectively, shown in solid colored lines. Again, compliance is based on a 25-month rolling median shown as dotted colored lines in Figure 5. As shown in Figure 5, effluent sodium is below the 230 mg/L limit and effluent sulfate is below the 500 mg/L limit, but chloride has had individual values in the past that exceeded the 165 mg/L limit. However, the 25-month rolling median for chloride values since mid-2019 meets the 165 mg/L limit.

Figure 5 Comparison of Effluent Sodium, Chloride, and Sulfate to NOA Limits

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
The effluent limit for boron is 0.5 mg/L, shown as the solid purple line. As shown in Figure 6, the 25-month rolling median (shown as a dotted purple line) of historical effluent boron levels is below

0.5 mg/L.

Figure 6 Comparison of Effluent Boron to NOA Limits

2.2 Groundwater Quality
In addition to specifying effluent limits, the NOA also establishes groundwater quality limits that are based on a 25-month rolling median. These limits are based on the Basin Plan water quality objectives for the Upper Guadalupe Groundwater Basin. The City can choose to either comply with limits for TDS, sodium, chloride, sulfate, boron, and TN in the effluent (limits discussed in the previous section) or in the groundwater. If the City chooses to comply with limits in the groundwater, the City would need to develop a detailed groundwater monitoring plan and program.

Table 2 summarizes the limits for groundwater quality as well as the City’s historical groundwater data from 2018 to 2023. As shown in the table, most of the constituents are currently meeting the groundwater quality requirements, with the notable exception of TN. The existing wastewater processes were not designed for nitrogen removal nor are they capable of removing nitrogen. As shown in Table 2, TN is the only constituent in the groundwater where the average of historical data exceeds the groundwater limit.

However, it is important to note that the well that is upgradient of the City’s percolation ponds has significantly higher TN levels than the downgradient wells, likely due to the extensive agricultural use of lands surrounding the wastewater treatment and disposal facilities.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Table 2 Groundwater Quality Data (Average From 2018 to 2023) Constituent Limits Based on
General Order
No. R3-2020-0020(1)
Well 5H
(Upgradient)
UMW-1
(Downgradient)
DMW-1
(Downgradient)
DMW-2
(Downgradient)
TDS, mg/L 1,000 1,047 1,025 978 972
Sodium, mg/L 230 67 154 144 145
Chloride, mg/L 165 54 158 151 152
Sulfate, mg/L 500 386 214 215 235
Boron, mg/L 0.5 0.2 0.4 0.4 0.4
TN, mg/L 1.4 16.1(2) 7.0(2) 12.7(2) 17(2)
Notes:
(1) NOA groundwater limits based on 25-month rolling median. (2) Values shown in red indicate which constituents cannot comply with either the interim or final effluent limit.

Figures 7 to 12 show the groundwater sampling results from 2018 to 2023. While there are a few instances of individual sampling events higher than the limits, when using the 25-month rolling median the City is mostly in compliance with all groundwater limits except for TDS and TN.

Figure 7 TDS Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9
Figure 8 Sodium Values in the Groundwater Compared to NOA Limit Figure 9 Chloride Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Figure 10 Sulfate Values in the Groundwater Compared to NOA Limit Figure 11 Boron Values in the Groundwater Compared to NOA Limit

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
Figure 12 Total Nitrogen Values in the Groundwater Compared to NOA Limit SECTION 3 IDENTIFICATION OF CHOICE OF

COMPLIANCE LOCATION
While the City is able to comply for most constituents with either the effluent or groundwater limitations, the requirements for groundwater compliance are extensive. The Monitoring and Reporting Program established in the NOA states that the City’s current groundwater monitoring network is inadequate and requires that if the City chooses compliance in the groundwater they must comply with the following:
 Submit a groundwater monitoring work plan by October 16, 2024.  Submit a preliminary hydrogeologic groundwater model by October 16, 2024.  Propose installation of a minimum of three shallow groundwater monitoring wells and that these wells must be installed within 90 days of RWQCB approval.

Given this relatively short timeline to develop a groundwater monitoring plan and construct the monitoring wells, the City does not believe it can comply within the required timeline. Therefore, the City has elected to move forward with compliance in the effluent (Option 1) for all constituents.

Option 1 can be implemented right away as compared to Option 2 (groundwater compliance) which would require new infrastructure to be constructed, taking more time to implement. As the City continues to develop a plan and implementation process to meet the requirements of the General Order, it would like to reserve the right to utilize groundwater limitations (Option 2) in the future.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12
SECTION 4 DESCRIPTION AND CHRONOLOGY OF

EFFORTS SINCE NOTICE OF APPLICABILITY
Following the issuance of the NOA in June 2023, the City has invested significant time and effort to improve its treatment performance and comply with the interim effluent limits. As part of this effort, Carollo Engineers, Inc. (Carollo) was engaged to develop a WWTP Master Plan to determine how best to achieve the interim and future limits, to estimate what new facilities will cost, and to lay out how long it will take for implementation. In addition, Carollo has analyzed the existing wastewater treatment performance to evaluate several alternatives for implementation to meet the interim effluent limits.

Detailed descriptions of efforts to comply with the new interim effluent limits are discussed in more detail in the following section. Efforts include the following:
 Sampling plan and data collection.
 Process evaluations and optimization identification.
 Source control evaluation.
 Percolation pond investigations.

4.1 Summary of Investigations

4.1.1 Sampling Plan and Data Collection
Historically, the City has regularly monitored the influent and effluent streams for CBOD, TSS, total Kjeldahl nitrogen (TKN), and ammonia-nitrogen. In addition to the two liquid streams, the City also monitors solids streams including raw sludge, digested sludge, and solids hauled from the drying beds.

However, to evaluate the treatment capabilities of each unit process, additional data was required. A comprehensive sampling plan for a period of seven consecutive days was recommended by Carollo to collect additional process data. In December 2023, the City executed the sampling plan and collected daily composite data for 17 different constituents (chemical oxygen demand [COD], BOD₅, CBOD, TSS, volatile suspended solids [VSS], TKN, etc.) at 20 different process locations. The data collected during the sampling event allowed for detailed evaluation of the processes. The following bullets summarize the key findings from the evaluation:
 The average influent COD to BOD₅ ratio and COD to VSS ratio is higher than the typical range for municipal wastewater. The higher ratio suggests an impact from industrial waste streams or other non-municipal components in the influent.
 The primary clarifiers and primary trickling filters (PTFs) seem to be performing well and within the typical performance range. However, the secondary trickling filter (STF) performance was below the typical range, suggesting there may be ways to improve performance.  Effluent BOD₅ data collected during the sampling event averaged around 66 mg/L. The City has also started sampling BOD₅ regularly since October 2023 and averages around 71 mg/L. Therefore, the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
City will not be able to comply with the interim discharge limit of 60 mg/L and final discharge limit of 30 mg/L without improving the current performance and/or implementing new technologies.  Historically, the City has collected time-based composite samples for regular monitoring. However, flow-based composite samples are considered more representative and were, therefore, collected during the sampling event. These flow-based composite samples had lower BOD₅ results than the time-based composite sampling, indicating that the historical sampling method may be overestimating BOD₅. To get more representative data, the City is making an effort to implement flow-based sampling for regular monitoring.

4.1.2 Process Modeling and Optimization Identification
A steady state plant-wide process model was developed using BioWin version 6.2 (Envirosim) to help evaluate the current performance and develop near-term recommendations for process improvements and to establish unit process capacity. The model was utilized to evaluate recommendations for process improvements. Understanding that the TN limit cannot be met with the current treatment plant technologies, the focus has been on working towards achieving the interim limit for BOD₅ and TSS. The following are some of the potential opportunities recommended by Carollo based on the performance evaluation:
 Although the primary clarifiers’ performance is adequate and well within the typical performance, further improving performance could help reduce organic loading on trickling filters and improve effluent discharge. The process modeling analysis showed that with the improvement of primary clarifier performance, BOD₅ concentration in the final effluent will improve. Jar testing has been conducted to evaluate the impact of addition of ferric chloride at the primary clarifiers.  Secondary clarifier performance is also adequate and well within typical performance. However, adding polymer or coagulant at the secondary clarifiers will help reduce TSS and BOD₅ in the final effluent. The process modeling analysis showed that with the improvement of secondary clarifier performance, BOD₅ concentration in the final effluent will also improve. Jar testing has been conducted for evaluating the addition of various coagulants at the secondary clarifiers.  Distributor speed for PTFs and STFs: Spulkraft values were calculated for both PTFs and STFs which indicated that the distributors on trickling filters are rotating much faster than typical recommended rates. The trickling filter performance can be optimized by reducing the rotation speed of distributor arms. The rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units. The City is currently making progress on this alternative. Additionally, the City is also working on replacing distributor arms for one of the PTFs which has reached the end of its useful life.
 Tertiary filters: The addition of tertiary filtration would remove suspended solids from secondary effluent resulting in reducing both TSS and BOD₅ in the final effluent. Particle removal is achieved by passing wastewater through a filtering media. While the City does not currently have tertiary filtration, they are investigating the costs and feasibility of bringing in temporary filtration to help improve the final effluent quality.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14

4.1.3 Source Control Evaluation
Due to the City’s inability to comply with the interim and final limits for BOD₅, TSS, and TN, as well as uncertainty about consistently meeting TDS requirements, a review of the City’s pretreatment program records was conducted to evaluate if industrial or septage discharges are contributing to elevated influent concentrations. Findings included the following:
 On average, septage discharges account for 2.3 percent of BOD₅ loading to the WWTP influent.

However, considering that septage deliveries are only accepted during business hours, the septage BOD₅ loading ranges from 2 to 9 percent of the influent loading during those hours. Even at these higher percentages during business hours, the septage loads were not considered a significant contribution to the overall BOD₅ concentration in the treated effluent from the WWTP.  Industrial discharges monitored as part of the City’s pretreatment program are 3.7 percent of the BOD₅ and 1.5 percent of the TSS loading to the WWTP influent. TN discharges from the industries are not currently tracked by the City. Due to the agricultural activity in Santa Maria, the industrial users discharge more in the summer and can reach discharges of 7 percent of BOD₅ and 2.6 percent of TSS loading to the WWTP influent. But, even at these levels, industrial discharges were not considered a significant contribution to the overall loading to the WWTP influent.  From 2019 to 2023, average TDS concentrations from individual significant industrial users remained well below their 1,800 mg/L local limit. Monthly effluent concentrations range from 700 to 1,600 mg/L of TDS. When compared with the effluent limits, this results in a combined contribution of 4.2 percent of the influent load from all the industrial dischargers. Therefore, industrial discharges are not considered a significant contribution to the overall loading of TDS to the WWTP.

4.1.4 Percolation Pond Investigations and Improvements
The NOA limits the disposal of effluent to the percolation ponds at 8 million gallons per day (mgd) based on information the City provided to the RWQCB regarding pond capacity. The City is currently investigating the pond capacity further and looking for ways to improve performance, including developing a water balance, performing geological and hydrogeological sampling and testing, and developing recommendations for improved percolation. The City submitted a letter request to the RWQCB on April 10, 2024, proposing to re-establish pond capacity on the southeast portion of the WWTP to accommodate retention and percolation of additional effluent from the infiltration/inflow generated from the recent back-to-back wet winters on the Central Coast, to provide some redundancy in similar weather conditions in the future, and to complement with additional storage the WWTP’s pond maintenance and performance evaluation currently being performed by the City’s consultant team. The request included details on approximate sizing and location of the three re-established percolation ponds.

The Master Plan (under development) will also identify improvements needed for disposal in the future including pond maintenance/rehabilitation and potentially new percolation pond development to meet the growth demands of the City.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15

4.2 Further Investigation
Based on the discussion above, the following are the potential alternatives and considerations for interim compliance that need further investigation by temporary trials before finalizing the alternatives for full-scale implementation:
 Tertiary filter piloting.
 Coagulant addition at secondary clarifiers.
 Ferric chloride addition at primary clarifiers.
 TDS source water study.
 Percolation pond capacity and improvements.

Each of these additional investigations are discussed in greater detail in the next section.

SECTION 5 JUSTIFICATION OF NEED FOR ADDITIONAL

TIME AND DETAILED SCHEDULE OF ACTIONS
The approach for both interim and final compliance has many steps and therefore will take time. The City has already hired a consultant (Carollo) recognizing help is needed to investigate alternatives for compliance and that a comprehensive plan needs to be developed.

5.1 Proposed Actions
Based on the discussion above, the following are the proposed actions that need further investigation before finalizing an alternative for full-scale implementation:
 Tertiary filters: The City is evaluating whether temporary tertiary filters could help meet compliance in the near term. Investigations have shown that filtration of the secondary effluent may reduce the BOD₅ to below the interim limits. The City is evaluating logistics and seeking pricing to rent a 1-mgd pilot tertiary filter system that can be installed at the WWTP to confirm the viability of this approach.

The concept will be to operate the pilot for approximately four to five months to establish/determine the following:
» Filter performance criteria and the filterability of the secondary effluent. » The need for chemicals to assist with filtration.
» BOD₅ and TSS removal efficiency.
» Filter backwash frequency and flow.
» Impacts of backwash water on the existing solids handling facilities.

If the testing is successful, then the next step would be to determine the scalability, pricing, and approach for a more permanent facility that would treat all or part of the secondary effluent to meet the interim limits for BOD₅ and TSS.
 Coagulant addition at secondary clarifiers: Several rounds of jar testing have been conducted by Carollo to determine the type and optimum dosage for coagulant addition upstream of the secondary clarifiers. Based on the jar testing results there may be potential for water quality improvement. If the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
tertiary filtration work, described above, is not successful, the City may conduct a trial test by adding coagulant to one of the clarifiers to assess its effectiveness. The addition of coagulant at secondary clarifiers is complicated for the City’s plant as there are significant return flows back into the plant.

This may have potential detrimental impacts to the trickling filter performance and other processes or require additional modifications to the treatment regime. It is anticipated that it will take approximately six months to set up and conduct such tests to determine if it is feasible to implement coagulant addition full scale at the secondary clarifiers.  Ferric chloride addition at primary clarifiers: Several rounds of jar testing have also been conducted by Carollo to determine the optimum dosage for the addition of ferric chloride upstream of primary clarifiers. Jar testing using three different coagulants was performed and ferric chloride performed best. The process model that Carollo developed for the existing plant was used to simulate the impact of implementing chemically enhanced primary treatment (CEPT). The model results show there is potential to reduce the BOD₅ concentration in the effluent stream to below the interim limits.

However, there are uncertainties about the impacts of ferric chloride addition on the other treatment processes. In addition, this approach is expected to have the highest costs for chemicals. Accordingly, since the primary clarifiers are already performing within expected values, the City is focusing on other improvement options described above. However, if the tertiary filtration and coagulant addition at the secondary clarifiers are not successful, a pilot test of CEPT could be developed to add coagulant to the primary clarifiers. It would take at least four to six months to implement such a pilot test.  TDS source water study: With the historical TDS data showing an increasing trend in concentrations and the 25-month rolling historical median showing a few values exceeding the new limit, the City will do an evaluation of the TDS in its source water to determine if the cause of the increases is due to conservation, contributions through use (wastewater), and/or use of water softeners. The City will also explore options for blending of supplies or implementing a self-regenerating softener ban to determine if any of these actions would help reduce TDS in the effluent. The study will identify the increase in TDS from source water to wastewater influent (human additions) and identify if an “intake credit” is an applicable regulatory approach. It is anticipated that this study would take one year to complete.
 Percolation pond capacity and improvements: As part of planning for future expansion and growth within the City, an important aspect is understanding the capacity of the existing percolation ponds.

The ongoing study and water balance calculations (part of the Master Plan) will identify capacity and near-term improvements needed to sustain and/or improve performance. It will also help identify the long-term disposal needs for the Master Plan.
 Master Plan: The City has already committed to completing a Master Plan to lay out the needed improvements for long-term wastewater treatment to meet the final effluent limits. This Master Plan development effort is already underway and includes data collection and review, flow and load projections, condition assessment, regulatory assessment, treatment process performance and capacity assessment, evaluation of liquid and solids alternatives (including reuse and energy management), capital improvement plan development, and financial planning.

5.2 Justification for Schedule
The first step is the evaluation of interim compliance options and the investigations into these options as discussed above. These investigations and pilots will be carried out in a stepwise process so that the

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
improvements from each specific action can be assessed before trying another improvement option. The stepwise process also reduces the risk that multiple, significant changes in the wastewater treatment process may have unintended, negative consequence on effluent discharge.

Task 1 includes ongoing optimization of the existing plant performance and all the investigations and piloting for meeting the BOD₅ and TSS interim limit of 60 mg/L. This task includes the current ongoing effort on optimizing plant performance through rehabilitation and reducing the speed of distributor arms for both PTFs and STFs (shown as Task 1a in Figure 13). Following completion of the existing plant optimization, piloting tertiary filtration will be the next step (shown as Task 1b in Figure 13). The tertiary pilot will take time to get into place and needs to run for several months. If successful, a larger scale filter system could be implemented. If tertiary filtration pilot testing is unsuccessful, then the other approaches will be tested for implementation (Tasks 1c and 1d for coagulant addition to the secondary and primary clarifiers) in a sequential order to determine if the new process is working prior to proceeding with the next step. Since the City’s peak flows and loads are during the summer months due to food processing, it is important for any pilot testing to include the summer months. The need for summer testing of any option, paired with the need for several months of operations and the need to only change one parameter at a time to determine impact of the change, means that Task 1 will take approximately a year and a half. Following completion of each of these Task 1 studies, the City will meet with the RWQCB to discuss an appropriate approach for interim compliance, including potential capital improvements and permit modifications, if needed.

In Task 2, the City will also begin a study on TDS in the source water to investigate the increasing concentrations of TDS in the influent. As discussed above, it is expected that this study would take approximately one year to complete. The study would be started after RWQCB approval of this TSCP. It is anticipated that this study will require discussions with the RWQCB regarding implications of findings on the permit and if regulatory solutions are viable.

Task 3 includes the ongoing percolation pond water balance and hydrogeologic/geologic study that will continue to develop near-term improvement recommendations. This work is being conducted as part of the ongoing Master Plan and is expected to be completed by the end of 2024.

In parallel to the additional investigations and pilot studies, the Master Plan is being developed to identify improvements for long-term wastewater treatment to meet the final effluent limits (Task 4). Because the Master Plan effort is a large, comprehensive evaluation of the wastewater system, it is not expected to be completed until the end of 2025. When the Master Plan is near completion, a Program Strategy and Execution Plan for project implementation delivery will be developed (Task 5) which will include a more detailed implementation schedule. Task 5 will also be completed at the end of 2025.

Once the Master Plan and Program Strategy and Execution Plan are completed, the City will begin design (Task 6) on the required wastewater improvement projects to meet the final effluent limits. It is anticipated that a large capital project to improve effluent BOD₅, TSS, and TN will take approximately two and a half years to design and up to four years to construct (Task 7). Therefore, the final effluent compliance project will not be online and operating until the end of 2033.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 18

5.3 Detailed Time Schedule of Specific Actions
Figure 13 shows the time schedule of the specific actions that have been described in the section above.

These tasks are expected to be completed by the end of 2025.

Figure 13 Timeline for Determining Approach for Interim and Final Limit Compliance Figure 14 shows the overall timeline for implementing a WWTP improvement project to meet final effluent limits.

Figure 14 Timeline for Implementation of Project for Final Compliance SECTION 6 DEMONSTRATION THAT TIME SCHEDULE IS

AS SHORT AS POSSIBLE
The schedule presented in Figure 14 is the shortest timeline possible given the need to plan, design, and construct major improvements to meet the final effluent limits, which will require the City to move away

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19
from a trickling filter only secondary treatment technology and instead move to a treatment process that can both reduce effluent BOD₅/TSS and nitrify/denitrify to meet TN requirements. Likely processes include moving to an activated sludge process or adding additional nitrification/denitrification processes following the existing treatment facilities. The Master Plan will evaluate treatment options, including costs and time to implement, and will develop recommendations for implementation to meet the final effluent limits. This Master Plan and the resulting WWTP improvement project will require a significant investment of City staff time and budget. Therefore, it is prudent to develop a thorough plan before starting an implementation project, hence the two years of master planning shown in Figures 13 and 14. The improvement project costs are likely to be in the hundreds of millions for a facility of this size. Therefore, the design and construction will be lengthy. The timelines shown in Figure 14 are based on designs and construction timelines of similar facilities.

SECTION 7 PROPOSED INTERIM LIMITS, ACTIONS, AND

MEASURABLE MILESTONES
As demonstrated in the discussion above, planning, designing, and constructing a wastewater treatment facility that can meet the final effluent limits will require time. The City will continue its efforts to improve effluent quality with the goal of meeting interim limits. However, because the TN limits cannot be met without major modifications and upgrades to the WWTP, the City requests that the interim limits laid out in the NOA be extended until the end of 2033 when the WWTP improvement project will come online.

7.1 Proposed Interim Limits
The interim limits proposed are shown in Table 3 for the constituents that are likely to need interim limits longer than through June 16, 2025, as provided in the NOA. The proposed interim limits for BOD₅ and TSS are the same as the interim limits provided in the NOA, which were based on the effluent limits in the previous permit Order No. R3-2010-0001. While the NOA did not establish interim limits for TN, since the City cannot achieve the new limits by June 16, 2025, interim limits for TN are needed. The proposed TN interim limit shown in Table 3 is based on the 95th percentile value of effluent data collected on a quarterly basis from 2018 through 2023. Alternatively, the maximum observed value of 50 mg/L could also be used as the interim limit for TN.

Table 3 City of Santa Maria Proposed Interim WWTP Effluent Limits Constituent Units Proposed Interim Interim Dates
BOD₅ mg/L 100 (daily maximum)
60 (30-day average)
Until June 2033
TSS mg/L 100 (daily maximum)
60 (30-day average)
Until June 2033
TN mg/L 49.4 (25-month rolling median) Until June 2033

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20

7.2 Actions and Measurable Milestones
As presented earlier, the City is proposing a phased approach that includes investigations and determination of the most suitable option for compliance. This measured response recognizes the high costs of implementing treatment options and a commitment to identifying a program that best serves the ratepayers’ needs while achieving the intent of the General Permit.

Table 4 lays out the series of tasks and milestones that the City is proposing to bring the WWTP into compliance with the new permit requirements.

After completion of Tasks 1, 2, 3, 4, and 5, it is recommended that the City meet with the Central Coast RWQCB to discuss the next steps and the refinement of the implementation timeline. Meetings with the RWQCB will also be held at several points during Task 1 to discuss results.

Table 4 Proposed Time Schedule Tasks and Milestones
Task/Milestone Dates Description/Purpose
Central Coast RWQCB accepts
TSCP
TBD Establish interim and final limits, and lay out a plan and timeline for compliance.

Task 1 - Studies for Interim
Compliance for BOD₅ and TSS
5/2024 - 10/2025 The City will study potential solutions for interim limit compliance including modification of trickling filters, addition of temporary tertiary filtration, and coagulant addition to secondary and/or primary clarifiers.

Milestone 1 12/2024 Meet with RWQCB to discuss Tertiary Pilot results.

Milestone 2 8/2025 Meet with RWQCB, if needed, to discuss Secondary Clarifier Coagulation Pilot results.

Milestone 3 12/2025 Meet with RWQCB to discuss summary of Task 1 investigations, results of changes, and plan of action, if needed.

Task 2 - TDS Source Water Study 9/2024 - 9/2025 The City will conduct a study to investigate source water TDS including evaluating different sources, if increases in TDS are due to conservation or water softeners, and if blending supplies can meet objectives. The study will also consider if softener bans (addressing human added TDS) can be used
to meet the effluent limits.

Milestone 4 9/2025 Submit TDS source water study to RWQCB.

Task 3 - Percolation Pond
Investigation
1/2024 - 12/2024 The City will conduct a study to investigate percolation pond water balance, geology/hydrogeology, and capacity.

Recommendations for improvements will be developed.

Milestone 5 12/2024 Submit percolation pond study to RWQCB.

Task 4 - Master Planning for
Long-Term Improvements
1/2024 - 12/2025 Develop Master Plan to identify needed WWTP improvements to comply with NOA final effluent limits.

Milestone 6 12/2025 Notify RWQCB of completion of Master Plan and meet to discuss recommendations.

Task 5 - Program Strategy and
Execution Plan
6/2025 - 12/2025 Develop strategy and execution plan for implementing the recommended project from the Master Plan. Will include
delivery method and revised implementation timeline.

Milestone 7 12/2025 Submit new implementation schedule to RWQCB.

TIME SCHEDULE COMPLIANCE PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21
Task/Milestone Dates Description/Purpose
Task 6 - Procure Team, Design and
CEQA of WWTP Improvement
Project
1/2026 - 1/2029 The City will begin design and CEQA environmental review of recommended improvements following completion of Tasks 4 and 5.

Milestone 8 1/2029 Notify RWQCB of design completion and intent to construct.

Task 7 - Bid and Construct WWTP
Improvement Project
2/2029 - 8/2033 Bid and construct WWTP improvement project. Commission and operate upgraded WWTP to meet new effluent limits.

Milestone 9 9/2033 Notify RWQCB of completion of construction and compliance with final effluent limits.

Notes:

CEQA - California Environmental Quality Act; TBD - to be determined VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX J GROUNDWATER MONITORING
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-1
The groundwater monitoring program results from January 2018 through October 2023 are shown in Figures J.1 through J.7. All nitrate concentrations measured at the Background Well (5H) were above the Primary Maximum Contaminant Limit of 10 milligrams per liter (mg/L) while all concentrations measured in the monitoring wells were below background concentrations. The average effluent concentration was <0.2 mg/L. All groundwater concentrations were above the median total nitrogen groundwater objective for the Upper Guadalupe Sub-Area Basin of 1.4 mg/L. Total nitrogen concentrations in the monitoring wells were measured above background concentrations 18 times, and the average effluent concentration was 43 mg/L.

All groundwater concentrations were below the median sulfate groundwater objective of 500 mg/L (with one exception for the background well in 2020), and all concentrations in the monitoring wells were below background concentrations. The average effluent concentration was 196 mg/L. All background concentrations were below the median chloride groundwater objective of 165 mg/L, but concentrations measured in the monitoring wells were greater than 165 mg/L nine times. The average effluent concentration was 156 mg/L.

All groundwater concentrations were below the median boron groundwater objective of 0.5 mg/L, but all concentrations measured in the monitoring wells were greater than background results. The average effluent concentration was 0.35 mg/L. All groundwater concentrations were below the median sodium groundwater objective of 230 mg/L, but all concentrations measured in the monitoring wells were greater than the background concentrations. The average effluent concentration was 145 mg/L.

Most groundwater concentrations were above the median total dissolved solids groundwater objective of 1,000 mg/L, and recent monitoring well concentrations were greater than background results. The average effluent concentration was 844 mg/L.

Figure J.1 Groundwater Monitoring Wells - Nitrate
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-2
Figure J.2 Groundwater Monitoring Wells - Total Nitrogen Figure J.3 Groundwater Monitoring Wells - Sulfate
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-3
Figure J.4 Groundwater Monitoring Wells - Chloride
Figure J.5 Groundwater Monitoring Wells - Boron
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN J-4
Figure J.6 Groundwater Monitoring Wells - Sodium
Figure J.7 Groundwater Monitoring Wells - Total Dissolved Solids 0 200
400
600
800
1000
1200
1400
10/8/19 4/25/20 11/11/20 5/30/21 12/16/21 7/4/22 1/20/23 8/8/23 Concentration (mg/L)
Total Dissolved Solids
25-Month Rolling Median (1,000 mg/L)
Background Well (5H)
UMW-1
DMW-1
DMW-2
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX K TDS SOURCE WATER IMPROVEMENT
STUDY

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TDS Source Water Improvement Study
September 2025 / FINAL

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TDS Source Water Improvement Study
September 2025 / FINAL
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:19:31-07'00'

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/TDS Source Wtr Imprvmnt Study/TDS Source Water Improvement Study.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Background and Purpose 1

1.2 Approach 3

1.3 Data Collection and Review 3
SECTION 2 WATER SUPPLY 3
SECTION 3 WATER QUALITY ANALYSIS 5

3.1 Groundwater Water Quality Data 5

3.2 State Water Project Quality Data 6

3.3 Blended Water Quality Data 6

3.4 Industrial Discharge Water Quality Data 7

3.5 Wastewater Quality Data 9

3.5.1 Septage Water Quality Data 9
SECTION 4 SALT CONTRIBUTION 11

4.1 Source Salt Contributions 11

4.1.1 Comparison of Conservation on Wastewater Treatment Plant Influent 12

4.1.2 Comparison of Source Water Salt Contributions 13

4.1.3 Water Softener Regulations 13

4.1.4 Industrial Discharge Regulations 15

4.1.5 Septage Total Dissolved Solids 16
SECTION 5 ALTERNATIVES 16

5.1 Overview 16

5.1.1 Source Water Supplies 17

5.2 Option 1: Blending 20

5.2.1 Removal of Well 9 From Stream 20

5.2.2 Removal of all State Water Project Water 20

5.2.3 Installation of Packers 20

5.2.4 Summary 21

5.3 Option 2: Reverse Osmosis at Blending and Disinfection Facility 22

5.3.1 Reverse Osmosis Sizing Assumptions 22

5.3.2 Reverse Osmosis at Blending and Disinfection Facility 23

5.4 Option 3: Reverse Osmosis at Wastewater Treatment Plant Effluent 25 SECTION 6 SUMMARY AND RECOMMENDATIONS 28

6.1 Summary of Findings and Recommendations for Compliance 28

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Appendices

APPENDIX A GROUNDWATER QUALITY

APPENDIX B SWP WATER QUALITY - POLONIO PASS AND BLENDING AND DISINFECTION FACILITY

APPENDIX C WASTEWATER QUALITY DATA

APPENDIX D SUMMARY OF LOADING INTO THE WWTP FOR ALL CONSTITUENTS

APPENDIX E SANTA MARIA MUNICIPAL CODE REGARDING WATER SOFTENERS

APPENDIX F SIGNIFICANT INDUSTRIAL DISCHARGER TDS CONCENTRATIONS OVER TIME Tables
Table 1 Comparison of TDS Permit Limits and Current Effluent Concentrations 1 Table 2 Historical Total Water Rights and Supplies Used 3 Table 3 Groundwater Wells Water Quality Data 5
Table 4 SWP Water Quality Data 6
Table 5 Santa Maria Blended Water Quality Data 7
Table 6 TDS Concentrations at the WWTP Effluent Point 9 Table 7 Santa Maria Septage Flow Contributions From Eight Major Haulers 10 Table 8 Santa Maria Septage TDS Concentrations 10
Table 9 Sources of TDS Loading into WWTP 11
Table 10 Comparison of Source Water Blends for TDS 13
Table 11 Loading Limit Calculation 16
Table 12 Current Groundwater Well Capacities 17
Table 13 Packer Installation Dates 21
Table 14 Effect of Blending Strategies on WWTP Effluent Concentrations 21 Table 15 RO Analysis Assumptions - Blending and Disinfection Facility 23 Table 16 Required RO Sizing for Source Water 24
Table 17 Blending and Disinfection Facility RO Planning Level Cost Estimate (2025 Dollars) 24
Table 18 RO Analysis Assumptions 25
Table 19 Required RO Sizing for WWTP Effluent 26
Table 20 WWTP RO Planning Level Costs (2025 Dollars) 27 Figures
Figure 1 TDS Concentrations in WWTP Effluent - 2018-2024 2 Figure 2 City Drinking Water Source Makeup 4
Figure 3 Total Supplied Water 4
Figure 4 TDS Concentration Trends - Groundwater Wells 6 Figure 5 TDS Concentration Trends - Industrial Dischargers 8 Figure 6 WWTP TDS Loading and Flow 12
Figure 7 Local Limits Development Guidance - Equation 6.1 15 Figure 8 Locations of Existing Water Production Facilities and Pipelines 18 Figure 9 Option 2 Layout - RO at the Drinking Water Facility 23 Figure 10 Option 3 Layout - RO at the WWTP 26

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AFY acre-feet per year
CaCO3 calcium carbonate
Carollo Carollo Engineers
City City of Santa Maria
DWR Department of Water Resources
EPA Environmental Protection Agency
General Permit General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems With Flows Greater Than 100,000 Gallons per Day gpd gallons per day
gpm gallons per minute
MAHL maximum allowable headworks loading
MF microfiltration
mg/L milligrams per liter
mgd million gallons per day
N/A not applicable
NOA Notice of Applicability
ppd pounds per day
RO reverse osmosis
RWQCB Regional Water Quality Control Board
SIU significant industrial user
Study TDS Source Water Improvement Study
SWP State Water Project
TDS total dissolved solids
TSCP Time Schedule Compliance Plan
UF ultrafiltration
WWTP Santa Maria Wastewater Treatment Plant

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION

1.1 Background and Purpose
The City of Santa Maria (City) owns and operates the Santa Maria Wastewater Treatment Plant (WWTP).

The WWTP is a trickling filter plant that is currently treating around 7 million gallons per day (mgd). The WWTP provides secondary treatment and accepts septage from domestic, industrial, and commercial users.

In September 2020, the Central Coast Regional Water Quality Control Board (RWQCB) adopted a General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems With Flows Greater Than 100,000 Gallons per Day (General Permit). The City was enrolled into the General Permit through a Notice of Applicability (NOA) in June 2023, which establishes updated effluent discharge requirements for the City, including limits to protect the Upper Guadalupe Groundwater Basin for total dissolved solids (TDS), sodium, chloride, sulfate, and boron. Since the City was unable to meet the new effluent limits for a number of constituents, they prepared a Time Schedule Compliance Plan (TSCP) outlining the City's plan and timeline to come into effluent permit compliance.

While the limits to protect the groundwater basin are established as 25-month rolling medians, in reviewing historical data, it became clear that the TDS rolling median would have exceeded the new limit at times, as shown on Figure 1. Therefore, as part of the TSCP, the City proposed the creation of this TDS Source Water Improvement Study (Study) in order to analyze the water and wastewater quality within the City's service area and use that data to evaluate options for WWTP permit compliance for TDS.

The updated permitted limits for TDS and TDS constituents compared to the average effluent quality of the WWTP from 2018 to 2024 are shown in Table 1.

Table 1 Comparison of TDS Permit Limits and Current Effluent Concentrations Constituent Units
Final Limits as of June 16, 2025
Based on New General Order
No. R3-2020-0020
Average Effluent
2018 to 2024(1)
Range of Effluent Data
2018 to 2024
(Minimum to Maximum)
TDS mg/L 1,000(1) 890 590 - 1,128
Sodium mg/L 230(2) 139 120 - 160
Chloride mg/L 165 149 110 - 197(3)
Sulfate mg/L 500 224 69 - 340
Boron mg/L 0.5 0.37 0.24 - 0.47
Notes:
mg/L - milligrams per liter
(1) Based on 25-month rolling median.
(2) The Sodium limit indicated here is consistent with General Order No.R3-2020-0020. However, it differs from the NOA issued to the City of Santa Maria. The NOA states the effluent limit for sodium as 105 mg/L on a 25-month rolling median. The City contends that 230 mg/L is the correct value for the sodium limit based on the General Order and requested in the City’s letter to the RWQCB dated July 13, 2023, that the RWQCB correct the City’s NOA. (3) The City’s effluent chloride levels have been below 165 since mid-2019.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
Figure 1 TDS Concentrations in WWTP Effluent - 2018-2024 Table 1 illustrates that the WWTP effluent concentrations for TDS, sodium, chloride, boron, and sulfate remain below the final limits provided under the General Permit. However, there is a discrepancy in the sodium limit between the General Permit and the NOA. The General Permit lists a sodium limit of 230 mg/L for the Upper Guadalupe Groundwater Basin, whereas the NOA lists a sodium limit of 105 mg/L.

The City has requested, in a letter to the RWQCB dated July 13, 2023, that the RWQCB correct this mistake in the NOA. For the purposes of this report, only TDS is evaluated, as the other constituents are not at risk for violating the new effluent limits.

This Study evaluates the currently available water and wastewater data to investigate the possibility and feasibility of source water blending and treatment options to come into compliance with the WWTP effluent permit requirements. The purpose of this Study is to summarize the results of the investigations and evaluations and develop options for compliance.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3

1.2 Approach
Carollo Engineers' (Carollo) approach to conducting the work outlined in this Study began with analyzing existing water and wastewater quality data provided by the City and by publicly available data, going back to 2012. The approach considers the possible sources of TDS into the system, including contributions from septage, industrial dischargers, and existing source waters.

1.3 Data Collection and Review
Carollo utilized data provided by the City as well as publicly available databases summarizing source water quality. The City currently samples its groundwater wells on an annual basis for TDS and hardness. It samples groundwater triennially for chloride, sulfate, sodium, and boron.

The City also provides quarterly sampling of its finished water, distributed by a Blending and Disinfection Facility. This sampling provides data for TDS constituents.

State Water Project (SWP) water quality data is provided in annual consumer confidence reports.

Wastewater sampling for relevant constituents is conducted quarterly and has historically been limited to effluent sampling. The sum of historical data was analyzed by Carollo in the preparation of this Study and used to develop the recommendations herein.

The City has also conducted monthly flow and TDS monitoring of industrial sources; the data for those sources has been provided for inclusion into this Study.

SECTION 2 WATER SUPPLY
The City draws its source water from two sources, SWP water and groundwater from the Santa Maria Valley Groundwater Basin. The average annual water supply used from each source is summarized in Table 2. The actual allocation of SWP to Santa Maria is based on determinations by the California Department of Water Resources (DWR). The average allocation to Santa Maria based on those determinations is indicated in Table 2.

Table 2 Historical Total Water Rights and Supplies Used Source 2018-2024 Average
Production Value (AFY)
Water Rights
(average allocation, AFY(1))
Water Rights
(100% allocation, AFY)
SWP Water(2) 5,587 5,792 17,312
Groundwater(3) 7,269 19,400 19,400
Average Total Supply 12,866 25,192 36,558
Notes:

AFY - acre-feet per year
(1) Average allocation from the California DWR for SWP supplies averaged 33 percent from 2021 to 2024. (2) SWP water rights are the sum of both the purchased SWP water and return flow SWP rights based on 2025 allocations. (3) Groundwater rights are the sum of both the prescriptive Groundwater rights and the Twitchell Yield rights.

As indicated in Table 2, the average water supply of SWP utilized by the City nearly matches the total allocation determined by the California DWR. This indicates that the City is utilizing nearly the full amount of SWP water that is available to them. The SWP water resources are dependent on allocations

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
determined by the state, which vary significantly depending on statewide snowpack and streamflow conditions and other factors. This means that projected future water demand is more likely to be met by groundwater supplies to ensure supply resiliency.

The percentage of the supply sources from 2018 to 2024, based on actual average production, are plotted in Figure 2.

Figure 2 City Drinking Water Source Makeup
Figure 3 represents the total supplied water utilized for consumption from 2018 to 2024. The overall water production increases significantly in the summer months, reaching highs of around 15 mgd then decreasing to around 8 mgd in the winter months. The average water production for the past six years was 11.4 mgd, but has declined slightly over time, likely due to conservation efforts.

Figure 3 Total Supplied Water

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
SECTION 3 WATER QUALITY ANALYSIS
This section summarizes the water quality of the various water sources for TDS and salt loading at the WWTP. The primary sources are:
 Groundwater.
 SWP Water.
 Blended Water - (SWP and Groundwater).
 Industrial Dischargers.
 Septage.
 Domestic/Commercial Contributions.

3.1 Groundwater Water Quality Data
The City operates six active groundwater wells - wells 9S, 10S, 11S, 12S, 13S, and 14S. The hardness and TDS values are tracked and sampled annually in each individual well. Chloride, sodium, and sulfate are tracked triennially. Table 3 highlights the average concentration over the 12-year period between 2012 and 2024. Appendix A summarizes the compiled annual average concentrations for each constituent.

Table 3 Groundwater Wells Water Quality Data
Source Years 2012 - 2024 TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Well 9S Average 1,045 706 50 73 518
Well 10S Average 842 570 45 64 395
Well 11S Average 745 529 33 58 335
Well 12S Average 718 501 31 52 330
Well 13S Average 732 496 30 50 325
Well 14S Average 635 432 18 47 283
WWTP Limit Average 1,000 N/A 165 230 500
Notes:

CaCO3 - calcium carbonate; N/A - not applicable
Of the six wells, Well 9S is currently above the effluent permit limit of 1,000 mg/L for TDS, with an average concentration of 1,045 mg/L. Of the remaining wells, Well 10S is nearest to the limit, with an average concentration of 842 mg/L. The other wells are below this TDS limit; however, all values for TDS are above 600 mg/L. This means that the aquifer, due to natural sources and agricultural activity, contains elevated levels of TDS compared to other water sources discussed herein. Figure 4 shows the annual average concentration for each well from 2012 through 2024.

All wells have chloride, sodium, and sulfate concentrations that are well below the WWTP effluent limits, with the exception of Well 9S, which has an average sulfate concentration of 518 mg/L, which is above the limit of 500 mg/L.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 TDS Concentration Trends - Groundwater Wells

3.2 State Water Project Quality Data
SWP water for the City is treated at the Polonio Pass Water Treatment Plant in Northern San Luis Obispo County prior to delivery into the Coastal Branch by the Central Coast Water Authority. At that point, water quality constituents are sampled and recorded. The data from this sampling location is summarized in Table 4 as the average concentration recorded from 2012 to 2024. For a full list of recorded annual values, consult Appendix B.

Table 4 SWP Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012-2024 Average 306 107 86 64 70
WWTP Limit 1,000 N/A 165 230 500
All the constituents for the SWP water remain well below the permitted effluent limits.

3.3 Blended Water Quality Data
The City blends all their water supplies at the Blending and Disinfection Facility. At that facility, groundwater and SWP water are mixed, its quality is sampled, and constituents are tracked. The data

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
summarized in Table 5 are the values reported in the annual Consumer Confidence reports developed by the City from 2018 to 2024. The data is presented as a combined average concentration and represents the combined concentrations from SWP and groundwater sources. Appendix B summarizes the annual data for each constituent from the Blending and Disinfection Facility.

Table 5 Santa Maria Blended Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012-2024 Average 543 332 43 54 223
WWTP Limit 1,000 N/A 165 230 500
The values observed in Table 5 reflect the average water quality that is distributed to customers in Santa Maria.

3.4 Industrial Discharge Water Quality Data
The City currently tracks TDS concentrations of eight significant industrial users (SIUs) located in its service area. SIUs are entities that discharge a minimum of 25,000 gallons per day (gpd) of process wastewater or are deemed to have a reasonable potential for adversely affecting WWTP effluent quality. The SIUs tracked by the City from 2018 to 2024 are shown below:
 Culligan.
 Fess Parker Winery.
 Fresh Venture Foods.
 Miller Family Wine Company.
 Titan Frozen Fruit.
 Sure Fresh Berry.
 Sure Fresh Produce.
 Microwave Applications Group (not sampled for TDS).
 CalSoft (Quarterly data reporting beginning in 2024. Formerly known as Rayne Water Conditioning.

TDS data available under Rayne Water Conditioning Permit prior to 2024.).

The data provided by the City tracks TDS concentrations in industrial effluent on a routine basis. Each SIU is permitted and sampled for constituents of concern, and therefore, not all permits have the same sampling frequencies and parameters. Accordingly, tracking TDS, sodium, chloride, and sulfate is permit dependent. The City maintains a discharge TDS limit (local limit) for industrial dischargers at 1,820 mg/L.

This limit has not been updated since 2004. All available TDS concentrations from each industrial discharger from 2019 to 2024 are shown in Figure 5. Individual graphs illustrating TDS concentration over time from each industrial discharger are shown in Appendix F.

The TDS loading from all industrial dischargers over the time period averaged 4,700 pounds per day (ppd), with an average flow contribution of 0.53 mgd to the sewer system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Figure 5 TDS Concentration Trends - Industrial Dischargers 0 500
1000
1500
2000
2500
January-19
March
May
July
September
November
January-20
March
May
July
September
November
January-21
March
May
July
September
November
January-22
March
May
July
September
November
January-23
March
May
July
September
November
January-24
March
May
July
September
November
Culligan Fess Parker Winery Miller Family Wine
Company
Mission Linen Supply Fresh Venture Foods
Titan Frozen Fruit Sure Fresh Berry Sure Fresh Produce CalSoft / Rayne Local Limit

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9

3.5 Wastewater Quality Data
The City continually monitors water quality characteristics in the WWTP effluent. However, influent to the WWTP is not monitored for the salt compounds. To evaluate the progress and the trends of TDS constituents over the last five years, the annual average effluent concentrations of each permitted constituent (TDS, sodium, chloride, and sulfate) from 2018 to 2024 were compiled and are shown in Table 6. The remainder of the data can be found in Appendix C.

Table 6 TDS Concentrations at the WWTP Effluent Point
Year TDS
(mg/L)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018-2024 Average Effluent 878 146 139 224
WWTP Limit 1,000 165 230 500

3.5.1 Septage Water Quality Data
The City accepts septage from commercial and residential sources for treatment at the WWTP. Septage quality for each individual load is not currently tracked by the City. However, the City tracks the volume and flow of septage that is deposited by users. In March 2025, as part of the Master Plan process, the City conducted water quality sampling of the septage from eight of the largest haulers over a four-week period. The following companies with significant septage contributions were sampled during this period:
 Portable Johns.
 Ingram & Greene.
 Al's Septic Service.
 Harvey's Honey Huts.
 MarBorg Industries Inc.
 Pacific Petroleum Company.
 Valley Septic Service.
 United Site Services.

The septage volumes from each contributor, as well as the percentage of each company's septage compared to overall septage flows into the plant from all sources are shown in Table 7. The total septage contribution from all flows averaged approximately 44,000 gpd from 2023 to 2024, which was

0.67 percent of the WWTP influent flow. The eight major haulers listed above contributed 57 percent of the total flow.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Table 7 Santa Maria Septage Flow Contributions From Eight Major Haulers Company Daily Septage Contribution
(gpd)
Percentage of Septage Flow to the WWTP
(%)
Ingram & Greene 1,490 6%
Al's Septic Service 2,620 12%
Harvey's Honey Huts 5,352 5%
MarBorg Industries Inc. 2,202 12%
Portable Johns 5,306 3%
Pacific Petroleum Company 1,730 4%
Valley Septic Service 2,304 5%
United Site Services 4,043 9%
Total 21,004 57%
The average TDS concentrations from each source during the sampling event are summarized in Table 8.

Table 8 Santa Maria Septage TDS Concentrations
Company
Average TDS
Concentration
(mg/L)
Average Sodium
Concentration
(mg/L)
Average Chloride
Concentration
(mg/L)
Portable Johns 5,700 785 1,225
Ingram & Greene 2,100 605 1,010
Al's Septic Service 1,600 345 940
Harvey's Honey Huts 1,500 475 925
MarBorg Industries Inc. 3,900 458 930
Pacific Petroleum Company 2,600 432 520
Valley Septic Service 1,700 245 385
United Site Services 4,005 690 803
As noted in Table 8, the TDS concentrations from the selected sources are elevated and are higher than the stated-permitted levels. However, due to the relatively small flows of septage compared to overall influent to the plant, the impact of the TDS from septage sources may be limited.

The average daily TDS loading from septage is 1,033 ppd when adjusting for flow contributions of untracked sources. This represents a 2 percent contribution to the overall TDS from septage sources.

In June 2025, the City conducted further sampling in the influent sewer upstream and downstream of the septage receiving stations to quantify the effect of septage on water quality. TDS was one of the selected constituents that was monitored. Over the one-month sampling period, the average TDS concentrations of the wastewater before and after septage additions were as follows:
 WWTP pre-septage TDS concentration: 1,084 mg/L.
 WWTP post-septage TDS concentration: 1,096 mg/L.

The 12 mg/L increase in TDS concentration is equivalent to roughly a 2 percent increase in TDS loading, similar to what was observed during the earlier evaluation of the eight major septage haulers, again suggesting that the current septage haulers do not have a significant impact on the WWTP effluent TDS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
concentration. As noted from the June 2025 sampling event, the TDS concentration upstream of septage dumping was already above the 1,000-mg/L limit.

SECTION 4 SALT CONTRIBUTION

4.1 Source Salt Contributions
To assess the impact of each source on the influent salt (TDS) loading to the treatment plant, TDS contributions were calculated in ppd for each source. The primary contributors to TDS loading are residential sources, septage, industrial dischargers, and source water.

The contribution from blended source water to the WWTP influent TDS is adjusted to account for the portion of water that enters the sewer system, excluding losses due to irrigation or industrial use. This sewer-to-water ratio has been estimated at 62.7 percent, based on a comparison between the water produced at the Blending and Disinfection Facility and the observed influent flow at the WWTP.

Table 9 provides a summary of TDS loading from all sources and includes a calculation of the projected TDS contribution from residential and commercial sources. For industrial contributors, any months lacking available data were excluded from the average. It is assumed that no TDS is lost during treatment within the WWTP. Residential contributions were estimated by subtracting the TDS load from known sources from the total observed WWTP loading.

Appendix D presents the projected annual TDS loading into the WWTP influent.

Table 9 Sources of TDS Loading into WWTP
Year
Observed WWTP
Effluent TDS(1)
(ppd)
Blended Source Water
Sewer TDS(2)
(ppd)
Septage
TDS(3)
(ppd)
Industrial
TDS(4)
(ppd)
Calculated Residential/
Commercial
Contribution(5)
(ppd)
2018- 2024 Average 53,000 37,000 1,050 4,700 10,250
Percent of total TDS
Contribution
- 69.7% 2% 8.9% 19.4%
Notes:
(1) WWTP effluent TDS is assumed to be the same as WWTP Influent TDS. (2) Blended sewer TDS contributions are contributions from groundwater/SWP with the applied 62.7 percent water-to-sewer factor.
(3) Septage TDS loads approximated for other years based on four-week sampling study described in section 3.5.1; rounded up to 1,050 from 1,033.
(4) Industrial TDS contributions from observed data.
(5) Taken by subtracting the Residential Loading = WWTP Effluent TDS - (Sewer Contribution + Industrial + Septage).

Table 9 shows that source water and residential contributions are the largest contributors to TDS loading at the plant. Therefore, efforts to reduce TDS concentrations below permitted limits should focus primarily on lowering TDS levels in source water and residential/commercial discharges.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12

4.1.1 Comparison of Conservation on Wastewater Treatment Plant Influent The City's population and water use is projected to increase in the next 20 years. According to the 2020 Urban Water Management Plan, the City's water use is projected to grow from 13,244 acre-feet to 18,716 acre-feet by 2045. The City will likely see more conservation due to growth that will have to meet building codes that require water saving fixtures along with mandated water restrictions and education programs. As conservation increases, the concentration of TDS will increase.

Figure 6 compares WWTP influent flow and effluent TDS loading from 2018 to 2024.

Figure 6 WWTP TDS Loading and Flow
Figure 6 demonstrates that average influent flow has declined slightly over the last six years. In that same time period, the TDS load has increased.

In the review period, there are spikes in influent flow in the summer months, when Santa Maria sees an increase in population and agricultural activity. The harvest season in Santa Maria typically spans from June to October, which coincides with the increase in influent flow at the WWTP. However, it is expected that average influent flow will not increase at the same rate as population growth, as conservation programs in the City and state-mandated guidelines for conservation come into effect.

The City currently runs the following water conservation programs:
 Smart Landscape Rebate Program:
» Provides cost rebates and incentives to replace lawns and high-water usage plants with native and water-wise plants
» Applies to both single-family and commercial properties

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
 Landscape Water Restrictions:
» The City enforces restrictions on use of potable water on driveways, sidewalks, and decorative water features.
» No outdoor irrigation is permitted from 12:00 p.m. to 4:00 p.m. » Potable water is restricted for application on landscapes after periods of measurable rainfall. » Irrigating turf is prohibited at commercial, institutional, and industrial properties.  Water Awareness Month:
» An educational program that provides a focus on water conservation and highlights the importance of conservation in the City.
» The City distributes water conservation kits including low-flow showerheads, hose timers, shut-off nozzles, and moisture meter probes.
 Home Water Visits:
» The City coordinates and provides complimentary home water visits to residents. City staff inspect residential plumbing systems, meters, and irrigation systems and provide water conservation kits to homes, as needed.

The trends and the conservation programs indicate that WWTP TDS concentrations will likely increase.

4.1.2 Comparison of Source Water Salt Contributions
Table 10 summarizes the TDS loading contributions from the groundwater sources and from the SWP sources. Note that the loadings illustrated in Table 10 do not incorporate the sewer-to-water factor and reflect contributions from each source into the drinking water supply.

Table 10 Comparison of Source Water Blends for TDS
2020-2024 Average Groundwater(1) SWP(2)
Concentration (mg/L) 786 306
Flow (mgd) 7.9 3.5
Loading (ppd) 50,100 9,000
Notes:
(1) Loading calculation based on the loading of each well on an individual basis. For simplicity, the nominal averages of all well flows and concentrations are illustrated here.
(2) SWP loading rounded up from 8,970 ppd.

The groundwater TDS contributions impact the blended source water TDS much more than the SWP water TDS contributions. This indicates that reducing TDS loading in groundwater will likely have the greatest impact on final TDS concentrations at the WWTP. In other words, a smaller volume of groundwater will need to be treated to result in the same reduction in blended water TDS concentration.

4.1.3 Water Softener Regulations
The addition of TDS to the wastewater from residential and commercial use of water is not surprising, as TDS can be added through the use of detergents, cooking, washing, human waste, and water softeners.

While most anthropogenic addition of TDS cannot be controlled, the use of water softeners can be regulated.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14
Per Table 9, residential and commercial use contribute up to 10,450 ppd of TDS or roughly 20 percent of the observed influent loading. Reducing residential and commercial contributions may have an impact on final effluent concentrations. Controlling water softener use is one way to reduce salt contributions to the sewer. The City has already adopted water softener regulations as highlighted below. Appendix E provides the specific regulatory text that regulates water softener use in Santa Maria.

1. Softeners are permitted in non-residential structures if they are:
a. Centrally regenerating canister-type units.
b. Water softeners with demand control systems.
c. Water softeners that do not discharge additional TDS or TDS in excess of the equivalent produced by demand control water softeners. In this case, they must remove 3,350 grains of hardness per pound of salt applied (3,350 grains of hardness per pound of sodium chloride).

2. For new residential construction:
a. On-site regeneration water softeners that connect to a hot-water plumbing system are permitted for new residential construction.
b. Centrally regenerated canister water softeners may be installed in hot and cold water plumbing systems for new residential construction.

Another aspect of the City's regulation states that the Director of Public Works has the authority to prohibit the installation of any new on-site regeneration water softeners. It also grants the Director of Public Works the authority to prohibit the operation or maintenance of on-site regeneration water softeners, provided there is need for it. The City's Director of Public Works has not yet issued such an ordinance.

The City's regulations mean that water softeners are not banned in the City, but their use is regulated with performance criteria. The usage of on-site regeneration water softeners is still permitted but may be rescinded by the Director of Public Works. Further, centrally regenerating canister types are permitted in all homes.

For this TDS analysis, this means that residential contributors may still contribute significantly to sewer TDS loadings at the facility. Their usage should be monitored over time and reported to the Director of Public Works as a means to limit water softeners if TDS concentrations remain persistently high in the future.

It is important to note that water softeners typically exchange calcium and magnesium ions in the feedwater with sodium ions from the resin. To maintain the ion balance, more sodium ions are released than the number of calcium and magnesium ions removed, resulting in a softer water with a slightly higher TDS. During regeneration of the softener, high-strength salt solutions (sodium chloride) are needed to convert the resin back to the sodium form. Discharging the regeneration solution to the sewer will add considerably more TDS, and this is usually the concern with household water softeners. If TDS levels continue to rise and compliance becomes a problem, the City could consider doing a study to determine if TDS is increasing due to water softeners. Given the City’s current policies, it is unlikely that water softeners are the main source of the commercial/residential TDS contributions. Additional outreach and education efforts or permitting of commercial businesses may be considered in the future.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15

4.1.4 Industrial Discharge Regulations
SIUs in Santa Maria have a permitted local limit of 1,820 mg/L of TDS from their discharge. Figure 5 shows that some dischargers have exceeded that limit at times, but the majority remain below the stated limit.

The local limit for dischargers was previously updated in 2004.

In sum, industrial dischargers contribute roughly 4,700 ppd of TDS to the WWTP, corresponding to roughly 9 percent of the TDS loading, or an addition of about 85 mg/L to the TDS concentration based on a WWTP flow rate of 6.5 mgd.

Since the last local limit study was over 20 years ago, before water conservation began and when the combined WWTP influent TDS concentration was likely significantly lower, an update to the study is probably due. In addition, due to the potential effect of industrial discharge on WWTP TDS concentrations, the existing pretreatment guidelines established by the Environmental Protection Agency (EPA) suggest that an update to the local limits will likely be necessary as a protective measure for the WWTP effluent.

The justification for this comes from the EPA Local Limits Development Guidance document established in July 2004. In this document, the EPA notes that, if average influent loading exceeds 80 percent of the maximum allowable headworks loading (MAHL) for non-toxic pollutants (such as TDS), new local limits should be developed.

Based on the guidelines in the document, Table 11 illustrates how the City exceeds this guideline, and should reconsider their local limits for SIUs. The primary determinant for this decision is from Equation 6.1 in the Local Limits Development Guidance document (shown in Figure 7).

Figure 7 Local Limits Development Guidance - Equation 6.1

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
Table 11 Loading Limit Calculation
Parameter Flow
(mgd)
TDS Concentration
(mg/L)(1)
TDS Loading
(ppd)
Current Influent Loading(2) (LINFL) 7.14 894 53,300
MAHL(3) 8 1,000 66,700
Calculated Percentage (L, %) - - 80% (exceeds)
Notes:
(1) TDS concentration is based on effluent data in the absence of influent data. (2) Current influent loading (LINFL) is based on average observed flow and TDS concentrations from 2019 to 2024. (3) MAHL is based on average design flow and WWTP limit requirements.

As a result of the calculated loadings shown, the calculated percentage meets the existing EPA guidelines of 80 percent for an update to local limits. In addition, the previous update to the local limit was made in 2004, prior to water conservation and any upgrades or changes to the WWTP. As a result, it is recommended that the City pursue a sampling plan to accurately quantify influent TDS concentrations and use the updated results to potentially pursue an update in local limits for the City in parallel with the WWTP upgrades. This may mean that the TDS local limit of 1,820 mg/L standard is reduced to a lower value.

4.1.5 Septage Total Dissolved Solids
As noted in the sections above, sampling proceeded both upstream and downstream of the septage receiving points. The sampling indicated that septage contributes about 1,050 ppd or roughly 2 percent of overall TDS loading; adding about 20 mg/L of TDS at a WWTP flow rate of 6.5 mgd.

This contribution may have an impact on future compliance if overall TDS levels continue to rise. If TDS levels do continue to rise over time, the City could consider increasing septage fees or removing the septage service entirely if TDS concentrations continue their rising trends.

SECTION 5 ALTERNATIVES

5.1 Overview
As part of this Study, Carollo considered three potential options for WWTP permit compliance, focused on TDS since the other three parameters are currently within the effluent limits, and reducing TDS will reduce all three parameters, too. Options 1 and 2 are designed to control salts at their source in the City's drinking water supply. Option 3 considers salt treatment at the WWTP.

The first alternative, Option 1, evaluates different blending strategies from the existing source water supplies at the Blending and Disinfection Facility to reduce the influent salt loading into the plant.

Option 1 includes two different options for blending of existing groundwater and SWP supplies, including the installation of packers in one or more of the groundwater wells.

The second alternative, Option 2, considers the construction of a reverse osmosis (RO) treatment train at the Blending and Disinfection Facility, which will remove salts prior to distribution in the City's drinking water system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
The third alternative, Option 3, evaluates the addition of an RO treatment train at the WWTP, which will remove salts prior to effluent discharge.

Centralized water softening was not selected as an alternative to reduce TDS. Although water softening is effective at reducing hardness concentrations in source waters, the softening process typically results in an increase in sodium and a slightly higher overall TDS. In addition, considering that sodium also has a permitted limit at the WWTP, centralized water softening may pose issues for future exceedances for the sodium and chloride at the WWTP.

5.1.1 Source Water Supplies
The source water supply for Santa Maria is important to understand to evaluate potential solutions for decreasing TDS concentrations. Santa Maria benefits from a multi-source water portfolio that includes groundwater extraction, purchases from the SWP, rights to Twitchell Yield, and additional pumping rights on account of return SWP flows to the basin.

Of the groundwater sources, the City operates six active groundwater wells (Wells 9S, 10S, 11S, 12S, 13S, and 14S), with a total nominal well capacity of 13,950 gallons per minute (gpm), translating to 22,503 AFY of potential pumping capacity. The capacity of each groundwater well is summarized in Table 12.

Table 12 Current Groundwater Well Capacities
Well Name Nominal Well Capacity
(AFY)
9S 2,904
10S 4,033
11S 3,468
12S 4,033
13S 4,033
14S 4,033
Total 22,503
Figure 8 illustrates the current locations of the groundwater wells. It also depicts the Blending and Disinfection Facility, which blends both the groundwater and water purchased from the SWP for final delivery to customers. In Figure 8, Wells 2, 5, 7, and 8 are inactive or abandoned.

The data and Table 9 indicate that 70 percent of TDS loading into the plant is due to the loading contributions from source water. As such, finding solutions for blending of source water TDS is likely to have the most significant impact on WWTP effluent TDS concentration. !P
!ã
TUTU
!ã
!ã
!ã
!ã !ã
!ã
!ã
!ã
!ã
!ã
Well 12
Well 13
Well 14
Donovan Pressure
Monitoring Station
Reservoir 4
Reservoir 5
Reservoir 6
Well 5
Well 7
Well 8
Well 11
Well 10 Well 9
Blending and
Disinfection Facility
State Water
Turnout
Well 6 Well 2
Bradley Rd S Bradley Rd
S College Dr
W Donovan Rd
E Donovan Rd
Blosser Rd S Blosser Rd
W Stowell Rd
E Betteravia Rd
W Main St
E Main St
N Blosser Rd
Suey Rd
S Depot St
Rosemary Rd
E Stowell Rd
Prell Rd
Foxenwood Dr
N Broadway
Woodmere Rd
El Camino St
E Alvin Ave
N College Dr
College Dr
N Railroad Ave
W McCoy Ln
Skyway Dr
W Betteravia Rd
S Broadway
Orcutt Rd
State Rte 166
E Clark Ave
Cabrillo Hwy State Rte 1
Santa Maria Way
Orcutt Expy
Black Rd
Miller St S Miller St
US Hwy 101
State Rte 135
Last Revised: August 21, 2025 [ENTER PROJECT WISE PATH NAME TO MXD] For Example:pw://Carollo/Documents/Client/CA/ClientName/10265A00/Data/GIS/Figure_01_01.aprx O
0 0.35 0.7
Miles
Disclaimer: Features shown in this
figure are for planning purposes and
represent approximate locations.

Engineering and/or survey accuracy
is not implied.

Data Sources: City of Santa Maria, ESRI

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO
Figure 8 Locations of Existing Water Production Facilities and Pipelines

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
Legend
Blending and Disinfection
Facility
Donovan Pressure
Monitoring Station
!P State Water Turnout
TU Reservoir
!ã Well
!ã Inactive Well
!ã Abandoned Well
Reservoir Pipeline
State Water Turnout Line
Transmission Main
Future Well Line
Well Lines
Santa Maria City Limits

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19

5.1.1.1 Current Operational Approach
The six groundwater wells enter the Blending and Disinfection Facility through two groundwater header lines. The first header line connects Wells 10, 12, 13, and 14 while the second connects Well 11 to the facility. Well 9 is located directly adjacent to the Blending and Disinfection Facility, where its flow is directly piped and combined onsite. There is a pipeline connecting SWP water to the Blending and Disinfection Facility, where it combines with the groundwater flows. Figure 8 highlights the locations of each well relative to the Blending and Disinfection Facility.

At the Blending and Disinfection Facility, ammonia and chlorine are added to the blended water supply, which is then distributed to customers.

There are multiple operational considerations for each water source as the City aims to achieve required water production. For SWP water, there is a fixed annual fee charged to the City by the state. The City is also required to import 10,000 AFY of SWP if it is available. As such, there is both a financial and regulatory incentive for the City to utilize as much allocated SWP water as possible.

For the groundwater wells, nitrate concentrations from each source are observed to increase over time if the well is not utilized. Accordingly, the City aims to draw from each well consistently to reduce overall nitrate concentrations in the finished blend. Utilizing each well also helps stabilize water levels and prevents excessive drawdown in any single well. The City seeks to utilize water from all its available sources consistently to ensure they will continue to operate properly.

The City is investing in ongoing capital projects to install packers that will permit the City to draw from a deeper point in the aquifer and potentially reduce the level of nitrate in the groundwater well production coming from the upper levels of the aquifer. Currently, Wells 10, 13, and 14 have had packers installed.

In addition, there are new wells that are currently in construction that will go online in 2025 and 2026.

Well 15 will connect to the groundwater header line connecting Wells 10, 12, 13, and 14, while Well 6 will connect to the groundwater header line currently connected to Well 11. Well 6 is 1,000 gpm.

In summary:
 All sources are blended at the Blending and Disinfection Facility, including:
» SWP water from the Polonio Pass Water Treatment Plant that blends through a header pipeline. » Groundwater header line 1, which connects Wells 10, 12, 13, and 14 and future Well 15. » Groundwater header line 2, which connects Well 11 and future Well 6. » Well 9, which is connected directly to the facility.
 The City has incentive to utilize all groundwater wells consistently; if left unused, the nitrate concentrations have been observed to increase.
 The City has incentive to utilize SWP water due the flat-fee incentive structure and already maximizes SWP supplies as much as possible.
 Wells 10, 13, and 14 have installed packers to withdraw more water from deeper in the basin.  Wells 6 and 15 are projected to be constructed in 2025 and 2026, respectively.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20

5.2 Option 1: Blending
One of the primary methods the City may employ to reduce salts concentrations in the WWTP effluent is through blending of their existing source water. As noted in previous sections, source water contributes roughly 70 percent of the influent TDS loading.

This alternative considers several different scenarios that utilize different sources of groundwater and blending strategies in order to reduce TDS, sodium, and chloride concentrations in the blended water supply sent to consumers.

The blending analysis used the following assumptions:
 Average annual flows and concentrations from 2018 to 2024.  Correction factors from observed discrepancies between calculated loading and observed loadings are applied.
 62.7 percent water-to-sewer factor was applied to the finished water. This value was determined by matching the annual production from groundwater and source water sources to the WWTP influent.

5.2.1 Removal of Well 9 From Stream
Of all the groundwater production wells, Well 9S has the highest observed concentrations for TDS.

Per Table 12, it also has the smallest nominal well capacity. This means that removing Well 9 from the groundwater source supply may have the largest benefit in terms of applied loading and the smallest loss of available supply for the City.

This scenario removes Well 9 from the existing water production facilities and applies its production equally to all other wells. To provide a conservative evaluation, this scenario also assumes that future SWP water supply will decrease to a 25 percent allocation.

5.2.2 Removal of all State Water Project Water
To better understand the impact of SWP water on the TDS loading and concentrations at the WWTP, this scenario depicts the removal of all SWP water and assumes all water production is sustained by the wells.

SWP water has historically reported lower TDS concentrations than groundwater.

The replaced water production from SWP was distributed equally across each well.

5.2.3 Installation of Packers
This scenario evaluates the effect of installing packers on existing groundwater wells. As noted above, in an effort to reduce nitrate concentrations in the groundwater, the City has installed packers on Wells 10, 13, and 14. In Wells 10, 13, and 14, the packers are installed such that the wells draw from the aquifer at much lower depths.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21
The packers, their new depths, and their installation dates are summarized in Table 13.

Table 13 Packer Installation Dates
Well Packer Construction Date New Pump Depth
Well 10S January 2021 Pump extended from 250 feet to 460 feet below the ground Well 13S October 2017 Pump extended from 280 to 430 feet below the ground Well 14S October 2010 (replaced August 2019) Pump extended from 260 feet to 440 feet  As a result of the new packers, the concentrations of all the relevant constituents decreased in Wells 10S, 13S, and 14S.
 Well 14S has consistently had the lowest concentration of TDS, sodium, chloride, sulfate, and boron.

By taking the average improvement of each constituent from the well with packers and applying it to the other wells (9, 11, and 12), the effect of installing packers on TDS loading can be approximated. To be conservative, this scenario also assumes that future SWP water supply will decrease to a 25 percent allocation.

5.2.4 Summary
The effect of each blending alternative on the projected concentrations at the WWTP are illustrated in Table 14. The observed effluent concentrations are utilized as the point of comparison against the three blending strategies.

Table 14 Effect of Blending Strategies on WWTP Effluent Concentrations Constituent Baseline Condition -
Observed Effluent
Strategy 1-
Removal of Well 9
From Stream(1)
Strategy 2 -
Remove all SWP
Water(2)
Strategy 3 -
Install Packers on
Wells 9, 11, and 12(1)
TDS (mg/L) 895 884 1,020 882
Chloride (mg/L) 149 145 136 140
Sodium (mg/L) 139 137 136 133
Notes:
(1) Strategy 1 and 3 assume a 25 percent allocation of SWP water. (2) Strategy 2 assumes 0 percent allocation of SWP water.

Table 14 indicates that the City is dependent on SWP water to remain below permitted TDS limits.

However, since the City has no control over the ultimate allocation of SWP water, the effect of strategies 1 and 3 become more important.

If the packers are installed (Strategy 3), it is projected that the concentration of each constituent will slightly decrease, relative to removing Well 9 from service (Strategy 1). Strategy 3 results in a very modest improvement in the final concentrations while minimizing the effect on total water production.

By removing Well 9, there will be a small decrease in TDS concentrations observed at the WWTP effluent point relative to the baseline condition. However, the effect on chloride, sodium, and sulfate is less pronounced compared with Strategy 3. Also, shutting down Well 9 would decrease the City's overall supply capacity by 2,904 AFY, or 13 percent of supply.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 22
The blending alternatives presented for strategies 1 and 3 assume that SWP allocations remain at 25 percent of the allowable capacity. During drought conditions or situations where the current SWP allocations decrease significantly, meeting the limits will be challenging. However, strategy 3 is currently underway and other efforts, including planned well expansions of wells 6 and 15, may allow the City to mitigate the potential effects of future drought on TDS concentrations.

Ultimately, the installation of packers is recommended as it decreases TDS concentrations while maintaining water supply volumes. However, given that water supply conditions may change, it would be important to monitor the concentrations in well 9 and compensate the flow of well 9 with the water production from newer wells 6 and 15.

5.2.4.1 Costs
The costs for the alternatives are expected to be minimal for each alternative. For strategies 1 and 2, the observed effect can be achieved by changing operational methods and by closing existing pipeline connections. For strategy 3, the installation of packers in all of the groundwater wells is currently included in existing City capital project funding. As such, no additional costs incurred by the City were considered for this alternative.

5.3 Option 2: Reverse Osmosis at Blending and Disinfection Facility This alternative consists of constructing a treatment train at the Blending and Disinfection Facility to remove TDS. The best available treatment technology to remove this constituent is RO.

Microfiltration (MF) or ultrafiltration (UF) is typically used as a pretreatment step for RO. However, in this case, an MF or UF unit may not be required at the Blending and Disinfection Facility, because drinking water contains fewer suspended solids and contaminants than wastewater, reducing the risk of membrane fouling and eliminating the need for additional pretreatment. The pretreatment needs should be evaluated further if this alternative is selected for implementation.

Based on the data, the source water accounts for 70 percent of the TDS loading at the WWTP influent.

As such, treating TDS at this stage would reduce the eventual TDS loading at the WWTP effluent.

In addition, it would reduce water hardness and likely reduce the prevalence of water softeners.

5.3.1 Reverse Osmosis Sizing Assumptions
The analysis criteria for the RO are based on the current average water production flows and TDS concentrations leaving the Blending and Disinfection Facility. The RO treatment will receive a portion of the blended source water flow and reinject low-TDS RO permeate back into the system.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 23
Table 15 summarizes the design criteria and assumed values for the drinking water RO treatment scenario.

Table 15 RO Analysis Assumptions - Blending and Disinfection Facility Criteria Value Unit Remark
RO Permeate TDS
Concentration
100 mg/L For concentration of RO effluent water, 100 mg/L is a standard value utilized in assumptions.

RO Brine Rate 10 % It is assumed that 10% of the total influent flow to the RO unit will be sent to brine disposal.

RO Permeate Recovery 90 % It is assumed that 90% of the influent flow to the RO will be treated and combined with other flows. This assumption will need to be confirmed by a detailed water quality analysis, RO projection modeling, and possibly pilot testing.

Target Effluent Goal of
Combined Flows
800 mg/L The existing WWTP Limit is 1,000 mg/L. To ensure that the treatment process keeps the effluent well below permitted limits, a 20% safety factor is applied.

Average Water
Production

11.4 mgd 11.4 mgd is the average water production from 2018 to 2024 from the Blending and Disinfection Facility.

SWP Allocation 25 % For the Drinking Water RO scenario, it is assumed that future SWP allocations will be set at 25%, and the remainder of the supply will be provided by groundwater.

5.3.2 Reverse Osmosis at Blending and Disinfection Facility The proposed process flow diagram for this alternative is shown in Figure 9.

This preliminary analysis assumes that concentrate from the RO facility will be disposed of to a local abandoned oil well that has been permitted as a Class I non-hazardous injection well for brine disposal.

This is the approach used by Laguna County Sanitation District for their brine stream. Also, it has been assumed that the RO facility will operate at a high recovery level, around 90 percent or more, to reduce the volume of brine for disposal (see Table 15). Detailed water quality analysis and RO projection modeling will be required, and possibly pilot testing, in order to confirm the RO recovery that can be achieved. For this analysis, it was assumed that the RO brine would be pumped 5 miles to the injection well location.

Figure 9 Option 2 Layout - RO at the Drinking Water Facility

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 24
The RO unit was sized based on a future 25 percent SWP allocation from the blended source water. This is a conservative basis because a lower SWP allocation increases the TDS concentrations to be treated.

Table 16 summarizes the results from the mass balance scenario. To reach an average effluent TDS concentration of 800 mg/L at the WWTP, the RO unit would need to be sized at 2.0 mgd. The RO permeate with a concentration of 100 mg/L will be blended with untreated water at the Blending and Disinfection Facility to achieve a reduction of source water TDS that will reduce the amount of TDS entering the WWTP influent.

Table 16 Required RO Sizing for Source Water
Scenario Projected RO Sizing
(mgd)
RO at the Blending and Disinfection Facility 2.0
This 800 mg/L finished water concentration would keep the City below permitted limits and provide a reliable solution for reducing TDS in the effluent. By providing RO as a treatment tool, the reliance on SWP water to remain below TDS limits would be decreased.

5.3.2.1 Costs
The planning level cost for a 2.0-mgd RO unit operating at 90 percent recovery is shown in Table 17. The RO system would include RO treatment elements, pumping and feed tanks, a new RO building, a chemical feed system, and a brine disposal pipeline. Standard markups are applied, consistent with the Master Plan.

Table 17 Blending and Disinfection Facility RO Planning Level Cost Estimate (2025 Dollars) Description Estimated Cost
Blending and Disinfection Facility Pipelines $880,000
RO Treatment Infrastructure $12,700,000
Chemicals and Chemical Storage System $1,100,000
Brine Line Disposal System (and well conversion) $8,500,000 Total Direct Cost $23,180,000
Contingency (30%) $6,954,000
General Conditions (12.5%) $3,767,000
Contractor Overhead, Profit and Markup (15%) $4,520,000 Sales Tax (8.8%) $1,326,000
Total Estimated Construction Cost $39,747,000
Engineering, Legal, Construction Management, Owners Reserve (32%) $12,719,000 Total Estimated Project Cost $52,466,000

5.3.2.2 Implementation/Advantages
The primary advantage of this alternative is its ability to reduce TDS concentrations in the effluent and reduce reliance on the SWP. By treating water at the source, the projected TDS levels at the WWTP will be reduced below permitted limits.

However, this approach has limitations. It results in a loss of 10 percent of the water fed to the RO system, or about 0.2 mgd (244 AFY). However, this is a small amount compared to the City’s groundwater source.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 25
Another consideration is that this option also addresses only the TDS contribution from source water and does not mitigate additional inputs from residential, industrial, or septage sources. Residential TDS levels may remain elevated due to the continued use of water softeners, and further conservation, even with RO treatment in place. But, on the other hand, additional trains of RO could be added in future if needed to remove additional salt. Additionally, this alternative would require the management and disposal of RO brine, which could be a significant cost and effort as indicated in Table 17. For this alternative to be successful, the RO system would need to operate at a high recovery rate. A 90 percent recovery rate was assumed for the cost estimate, and this would need to be confirmed through additional evaluations and possibly pilot testing.

5.4 Option 3: Reverse Osmosis at Wastewater Treatment Plant Effluent
This alternative consists of constructing a treatment train at the WWTP to reduce TDS. Similar to Option 2, the best available treatment technology would be RO.

The analysis criteria for the RO system is based on the projected TDS concentrations at the WWTP effluent if all the SWP contributions are stopped.

Similar to Option 2, this analysis assumes that brine produced by the RO unit would be discharged to a converted oil well for disposal. In this case, the location of the deep well would be closer to the WWTP.

To minimize brine for disposal, it was assumed that the RO process would operate at the highest recovery possible. However, this may not be as high as could be achieved for Option 2 because of other constituents in the feedwater. So, for the purpose of the analysis, a recovery of 85 percent was assumed.

This would have to be confirmed during further evaluations and/or pilot testing.

Table 18 summarizes the design criteria and assumed values for the RO installed at the WWTP.

Table 18 RO Analysis Assumptions
Criteria Value Unit Remark
RO Permeate TDS
Concentration
100 mg/L For concentration of RO effluent water, 100 mg/L is a standard value utilized in assumptions.

RO Brine Rate 15 % It is assumed that 15% of the total influent flow to the RO unit will be sent to brine disposal.

RO Permeate Recovery 85 % It is assumed that 85% of the influent flow to the RO will be treated and combined with other flows.

Target Effluent Goal of
Combined Flows
800 mg/L The existing WWTP Limit is 1,000 mg/L. To ensure that the treatment process keeps the effluent well below permitted limits, a 20% safety factor is applied.

Average Wastewater
Effluent Flow

7.5 mgd The average effluent from 2018 to 2024 was 7.2 mgd. An increase to

7.5 mgd is to provide a safety factor for the sizing of the RO unit.

Average Wastewater
TDS Concentration
1,020 mg/L Expected TDS concentration if all SWP water is removed.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 26
In this case, an MF or UF system will need to be installed as pretreatment ahead of the RO trains. The proposed flow diagram for this scenario is shown in Figure 10.

Figure 10 Option 3 Layout - RO at the WWTP
Table 19 summarizes the required size of the RO system. Treated RO permeate would be blended back into the effluent for proper disposal. Compared to Option 2, the size of the RO unit for Option 3 would be smaller because the TDS concentration in the WWTP effluent would be higher, allowing the same mass of TDS to be removed with a smaller unit.

Table 19 Required RO Sizing for WWTP Effluent
Scenario Projected RO Sizing
(mgd)
RO sizing at the WWTP effluent point 1.8

5.4.1.1 Costs
The planning level cost estimate for a 1.8-mgd RO unit is shown in Table 20. The RO system would include RO treatment elements, pumping and feed tanks, a new RO building, a chemical feed system, and a brine disposal pipeline. This alternative also includes an MF system for pretreatment. Standard markups, consistent with the Master Plan, were applied.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 27
Table 20 WWTP RO Planning Level Costs (2025 Dollars)
Description Estimated Cost
WWTP Pipelines $400,000
MF/RO Treatment Infrastructure $22,000,000
Chemicals and Chemical Storage System $1,100,000
Brine Line Disposal System $5,900,000
Total Direct Cost $29,400,000
Contingency (30%) $8,820,000
General Conditions (12.5%) $4,778,000
Contractor Overhead, Profit, and Markup (15%) $5,733,000 Sales Tax (8.8%) $1,682,000
Total Estimated Construction Cost $50,413,000
Engineering, Legal, Construction Management, Owners Reserve (32%) $16,132,000 Total Estimated Project Cost $66,545,000

5.4.1.2 Implementation
Although Option 3 would have a smaller RO system than Option 2, the overall project cost is expected to be about 20-percent more expensive because of the MF/UF pretreatment system that would be needed.

Right now, TDS reduction in the WWTP effluent is not needed. But if the option for implementation via an RO facility at the WWTP is considered as a viable option, then an area of the plant could be set aside for this purpose as part of the ongoing Master Planning effort for the planned upgrades to the treatment facilities at the WWTP.

Similar to Option 2, RO treatment of the WWTP effluent would also allow the City to reduce their dependence on SWP water and, in the case of limited SWP availability, continue to meet TDS limits.

It would also address the TDS contributions from all sources.

The disadvantages of Option 3 are, firstly, that it comes at a significant cost, which may be prohibitive.

Second, the treated effluent that is percolated back into the groundwater basin would decrease by about

0.35 mgd (360 AFY) (the amount of brine produced). Although relatively small, this reduction in effluent has a direct impact on the City's water rights, as they receive credits for recharging the groundwater basin.

Additional detailed water quality analyses would be required in addition to pilot testing, as well as a brine management study, prior to selecting this as a preferred option.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 28
SECTION 6 SUMMARY AND RECOMMENDATIONS

6.1 Summary of Findings and Recommendations for Compliance The data summarized herein indicate that TDS loading at the WWTP is primarily driven by source water (70 percent) and residential contributions (20 percent). Current concentrations at the WWTP effluent are 895 mg/L –- roughly 100 mg/L below the permitted limit, and the 25-month rolling median is currently showing a downward trend. However, during drought periods with SWP cutbacks, the City has seen TDS levels increase, and, in the future, as WWTP flows are expected to only show moderate increases despite continued population growth, TDS concentrations are likely to increase over time due to water conservation efforts.

The first alternative for compliance considers changing blending and water procurement strategies.

It evaluated removing Well 9 and installing packers on existing wells. The results indicate that removing Well 9 or high TDS wells may have a limited impact on final WWTP quality. It also suggests that installing packers on all of the wells would only have a small impact on TDS loading. The TDS concentrations are vulnerable to future reductions in SWP allocations during drought periods. However, this alternative is the lowest-cost approach and, depending on future SWP allocations and future groundwater quality, may keep the City below the newly permitted TDS limits for some time.

The second alternative for compliance shows that installing an RO unit at the Blending and Disinfection Facility to treat a portion (about 2 mgd) of the groundwater would allow the City to remain below the TDS effluent limits. This option would reduce the dependence on SWP to remain below TDS limits, and it would have the benefit of providing a better quality, lower TDS water to the City’s customers. However, this option is expensive, it would reduce the City’s water supplies slightly due to treatment losses (about

0.2 mgd associated with RO brine disposal), and would require RO brine disposal/management. This alternative additionally would not significantly address industrial or septage contributions.

The third and most expensive alternative for compliance would be providing an RO unit at the WWTP, which would allow the City to comfortably remain below targeted TDS effluent limits. It would also provide treatment and TDS removal on all sources of TDS loading at the facility. It may also provide the City the option to explore additional water reuse alternatives. However, as mentioned, this is the most expensive option, and it would reduce the City's water rights by about 0.35 mgd (about 360 AFY) due to the credit received on percolated effluent and would require expensive RO brine disposal/management.

Of the three compliance alternatives, it would be most feasible for the City to implement Option 1 in the short term. However, over the longer term, this option may not achieve the desired TDS reductions if SWP supplies are reduced and there are further impacts due to water conservation. Accordingly, the City should continue to monitor the water quality of all sources to allow time to implement one of the other options should the 25-month rolling average of WWTP effluent TDS begin to trend upwards.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 29
As a result, the following recommendations are made:

1. Considering the prohibitive cost of both RO alternatives, it is recommended that the City continue with the installation of packers on their wells, as noted above, with the understanding that monitoring of TDS concentration would be tracked closely. It is also recommended that, if TDS conditions worsen, Well 9 be removed and replaced with new Wells 6 and 15.

2. Other TDS reduction mechanisms should be considered. These include conducting public outreach and education for residential and commercial customers regarding sources of TDS discharges and use of softeners, and continuing to monitor TDS from major septage haulers to determine whether loads are increasing. If TDS rises in the future, a ban on regenerative softeners by the Public Works Director should also be considered.

3. The City should consider implementing a sampling plan and updating their industrial local limits. With the implementation of the new limits and the current levels of concentration, based on EPA guidance, the City should reevaluate their local limits. A new local limits study would require a detailed sampling plan be implemented for TDS at the influent along with all the other pollutants of concern. More stringent local limits may reduce industrial TDS contributions to the plant and help to maintain the WWTP effluent TDS below the 1,000 mg/L limit.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A GROUNDWATER QUALITY

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-1
Table A.1 Historical Groundwater Well Concentrations
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Well 9S 2012 970 670
2013 1,200 720 55 76 530 0.22
2014 1,200 720
2015 1,200 790
2016 1,200 710 56 72 530 0.25
2017 940 740
2018 970 750
2019 1,000 690 52 75 520 0.2
2020 990 750
2021 1,000 710
2022 1,000 690 38 67 490 0.18
2023 1,000 630
2024 920 610
Average 1,045 706 50 73 518 0.21
Well 10S 2012 880 650
2013 910 500 43 61 390 0.15
2014 870 510
2015 860 580
2016 1,000 680 55 71 460 0.22
2017 770 650
2018 760 590
2019 910 610 56 69 430 0.19
2020
2021 740 530
2022 780 530 27 54 300 0.15
2023 830 490
2024 790 520
Average 842 570 45 64 395 0.18
Well 11S 2012 660 530
2013 750 470 34 59 320 0.15
2014 790 510
2015 780 540
2016 790 540 34 60 350 0.2
2017 650 500
2018 640 540
2019 760 510 33 56 350 0.16

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-2
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
2020 560 560
2021 790 530
2022 840 560 29 55 320 0.15
2023 850 530
2024 830 560
Average 745 529 33 58 335 0.17
Well 12S 2012 660 510
2013 700 440 25 51 290 0.12
2014 720 460
2015 780 550
2016
2017 700 560 45 56 390 0.17
2018 630 500
2019 750 520
2020 710 480 28 51 320 0.14
2021 770 550
2022 750 490
2023 720 480 26 48 320 0.15
2024 720 470
Average 718 501 31 52 330 0.15
Well 13S 2012 740 540
2013 880 550 39 55 360 < 0.1
2014 790 490
2015 740 520
2016 780 500 27 51 320 0.14
2017 830 640
2018 780 560
2019 680 470 33 46 330 0.18
2020 660 440
2021 630 420
2022 670 450 20 47 290 0.11
2023 680 440
2024 660 430
Average 732 496 30 50 325 0.14

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-3
Source Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
Boron
(mg/L)
Well 14S 2012 570 480
2013 680 430 18 49 270 0.13
2014 670 430
2015 680 430
2016 700 450 18 48 290 0.18
2017 540 440
2018 530 420
2019 660 420 21 45 290 0.14
2020 640 430
2021 640 430
2022 660 430 16 44 280 0.11
2023 660 420
2024 630 400
Average 635 432 18 47 283 0.14
Wastewater Treatment
Plant Limit
1,000 N/A 165 230 500 0.5
Notes:

CaCO3 - calcium carbonate; mg/L - milligrams per liter; N/A - not applicable; TDS - total dissolved solids

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX B SWP WATER QUALITY - POLONIO PASS

AND BLENDING AND DISINFECTION

FACILITY

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
Table B.1 SWP Water Quality Data
Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2012 308 101 86 62 71
2013 336 111 90 42 36
2014 428 138 120 130 120
2015 437 146 122 84 97
2016 346 115 97 87 100
2017 165 67 39 24 30
2018 220 96 81 40 55
2019 260 82 59 58 46
2020 280 97 73 56 63
2021 360 123 116 83 84
2022 380 127 104 76 96
2023 150 78 48 31 42
2024 270 88 62 57 60
Average 306 107 86 64 70
WWTP Limit 1,000 N/A 165 230 500
Notes:

CaCO3 - calcium carbonate; mg/L - milligrams per liter; N/A - not applicable; SWP - State Water Project; TDS - total dissolved solids; WWTP - wastewater treatment plant
Table B.2 Blended and Disinfection Facility Water Quality (Blend of SWP and Groundwater) Year TDS
(mg/L)
Hardness
(mg/L as CaCO3)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018 358 146 74 60 79
2019 407 236 37 43 155
2020 528 340 43 59 228
2021 600 390 50 64 265
2022 690 455 31 55 313
2023 593 375 27 48 255
2024 630 388 37 53 265
Average 543 332 43 54 223
WWTP Limit 1,000 N/A 165 230 500

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX C WASTEWATER QUALITY DATA

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN C-1
Table C.1 Annual WWTP Effluent Concentrations
Year Total Dissolved Solids
(mg/L)
Chloride
(mg/L)
Sodium
(mg/L)
Sulfate
(mg/L)
2018 839 176 153 167
2019 708 160 133 134
2020 890 145 143 225
2021 987 144 148 275
2022 1055 143 140 320
2023 808 132 128 250
2024 945 125 130 218
Average 890 148 139 223
Wastewater Treatment Plant Limit 1,000 165 230 500
Notes:
mg/L - milligrams per liter

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX D SUMMARY OF LOADING INTO THE WWTP

FOR ALL CONSTITUENTS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES D-1
Table D.1 Sources of TDS, Sodium, Chloride, and Sulfate Loading into WWTP Constituent Year
Blended Source
Water Sewer TDS(1)
(ppd)
Septage TDS(2,4)
(ppd)
Industrial
TDS(4)
(ppd)
WWTP Effluent
TDS(3)
(ppd)
TDS 2018 22,000 N/A N/A 53,000
2019 26,000 N/A 4,300 40,000
2020 33,000 N/A 4,200 54,000
2021 37,000 N/A 3,700 58,000
2022 41,000 N/A 4,400 65,000
2023 36,000 N/A 2,900 51,000
2024 38,000 1,050 3,600 52,000
Average 33,000 1,050 4,500 53,000
Chloride 2018 5,100 N/A N/A 10,800
2019 2,600 N/A N/A 9,100
2020 3,200 N/A N/A 8,900
2021 3,200 N/A N/A 8,400
2022 1,900 N/A N/A 8,800
2023 1,900 N/A N/A 8,500
2024 2,600 N/A N/A 6,800
Average 2,600 N/A N/A 8,800
Sodium 2018 3,800 N/A N/A 9,700
2019 3,200 N/A N/A 7,400
2020 3,800 N/A N/A 8,600
2021 4,400 N/A N/A 8,600
2022 3,800 N/A N/A 8,600
2023 3,200 N/A N/A 8,200
2024 3,200 N/A N/A 7,100
Average 3,300 N/A N/A 8,314
Sulfate 2018 5,100 N/A N/A 11,000
2019 9,500 N/A N/A 8,000
2020 14,500 N/A N/A 14,000
2021 16,400 N/A N/A 16,000
2022 18,900 N/A N/A 20,000
2023 15,100 N/A N/A 17,000
2024 15,700 N/A N/A 12,000
Average 14,000 N/A N/A 14,000
Notes:
ppd - pounds per day; N/A - not applicable; TDS - total dissolved solids; WWTP - wastewater treatment plant (1) Blended sewer TDS contributions are based on the applied 62.7 percent water-to-sewer factor. (2) Septage TDS loads approximated for other years based on four-week sampling study described in section 3.5.1. (3) Only WWTP effluent data reported for previous years. WWTP effluent assumed to be equivalent to WWTP influent. (4) No sodium, chloride, or sulfate data has been reported for septage or industrial sources.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX E SANTA MARIA MUNICIPAL CODE

REGARDING WATER SOFTENERS

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-1
The City of Santa Maria has provided restrictions on water softeners as part of an amendment to Chapter 6 of the California Plumbing Code. In the City's updates to its Municipal Code, the added amendments to the Plumbing Code of the City (Subsections 611.5 and 611.5.1) are listed in Table E.1.

Table E.1 Santa Maria Municipal Code Summary - Water Softeners City of Santa Maria
Municipal Code Regulation Application Regulatory Text
Plumbing Code (Ch 9-32.150,
subsection 611.5)
Non-Residential
Purposes
Only the following water softeners may be installed on structures utilized for non-residential purposes:
(1) Canister-type units which are centrally regenerated; or (2) Water softeners with demand control systems as defined in the City of Santa Maria Municipal Code, Section 8-12.104 (91, water softeners) & (92, demand control); or
(3) Such other water softeners, as determined by the administrative authority, which by objective testing and results will not discharge brine waste with a total dissolved solids concentration or frequency of discharge that exceeds the equivalent produced by the treatment process provided by demand control water
softeners as defined by the City of Santa Maria Municipal Code, Section 8.12.104 (91) & (92).

Plumbing Code (Ch 9-32.150,
subsection 611.5)
All Water
Softeners -
Subject to
Director of Public
Works
Determinations
Upon receipt of determinations and orders issued to the administrative authority by the Director of Public Works pursuant to the City of Santa Maria Municipal Code, Section 8-12.410, the following limitations shall apply:
(1) It shall be unlawful after the effective date of an order issued by the Director of Public Works pursuant to the City of Santa Maria Municipal Code, Section 8-12.410 (c) to install on any structure an on-site regeneration water softener as defined in Santa Maria Municipal Code, Section 8-12.104 (91); and/or
(2 It shall also be unlawful after the effective date of an order issued by the Director of Public Works pursuant to the City of Santa Maria Municipal Code Section 8-12.410 (c) to operate or maintain an on-site regeneration water softener after January 1, 2007.

Plumbing Code (Ch 9-32.150,
subsection 611.5.1)
New Residential
Construction
All users who install a water softener in new residential construction shall install plumbing so that only water feeding the hot water system is softened.

EXCEPT Canister-type units that are centrally regenerated may be connected to both cold and hot water systems in new residential construction

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-2
City of Santa Maria
Municipal Code Regulation Application Regulatory Text
Definitions
Plumbing Code -
Section 8-12.410 (91)
Water Softener "Water softener" means a unit using the ion exchange process designed to remove hardness (magnesium and/or calcium ions) from a water supply and requiring sodium chloride or any other salt to regenerate the exchange resin.

Plumbing Code -
Section 8-12.410 (91)
On-Site
Regeneration
Units
[Water softener] units that regenerate on location are referred to as "on-site regeneration units."
For the purpose of this section, "on location" shall mean that the unit need not be disconnected from the fixed plumbing and relocated to accommodate the regeneration process. On-site regeneration water softener shall further be described as a water softener which has been manufactured, or appropriately retrofitted with equipment to enable the unit to operate with a salt efficiency rating in compliance with a minimum rating as established by Section 4045 et seq. of the Health and Safety Code, but in no case less than three thousand, three hundred fifty (3,350) grains of hardness removed per pound of salt applied.

Plumbing Code -
Section 8-12.410 (92)
Demand Control "Demand control" means a system of controlling the periodic automatic regeneration of a water softener appliance, which is either based on a sensor which detects imminent exhaustion of the exchange bed or upon measurement of the total volume of water that has passed through the appliance since the last regeneration cycle.

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX F SIGNIFICANT INDUSTRIAL DISCHARGER

TDS CONCENTRATIONS OVER TIME

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-1
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
TDS mg/L
Fess Parker Wine Concentration
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Fresh Venture Foods Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-2
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Miller Family Wine Concentration
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Mission Linen Supply Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-3
0 500
1000
1500
2000
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
January
April
July
October
mg/L TDS
Titan Frozen Fruit Concentration
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
Culligan Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-4
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
SureFresh Produce Concentration
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
Sure Fresh Berry Concentration

TDS SOURCE WATER IMPROVEMENT STUDY
SEPTEMBER 2025 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN F-5
0 500
1000
1500
2000
January-19
April
July
October
January-20
April
July
October
January-21
April
July
October
January-22
April
July
October
January-23
April
July
October
January-24
April
July
October
mg/L TDS
CalSoft/Rayne Concentration
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX L TIME SCHEDULE ORDER
Central Coast Regional Water Quality Control Board
February 5, 2026
Shad Springer, Director of Utilities
City of Santa Maria — Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:

TIME SCHEDULE ORDER R3-2026-0009
This letter transmits Time Schedule Order R3-2026-0009 for the City of Santa Maria’s (Santa Maria) wastewater treatment plant. The Time Schedule Order is effective on the date it is signed and requires Santa Maria to comply with the interim biochemical oxygen demand, total suspended solids, and total nitrogen effluent limitations presented in Time Schedule Order R3-2026-0009 no later than September 30, 2034. Santa Maria must continue to comply with General Waste Discharge Requirements Order R3- 2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day.

The Central Coast Water Board prepared and posted a Public Notice of the draft Time Schedule Order R3-2026-0009 for public consideration from December 30, 2025 through January 30, 2026. The Central Coast Regional Water Quality Control Board (Central Coast Water Board) did not receive any comments on the draft Time Schedule Order R3-2026-0009.

Please see Time Schedule Order R3-2026-0009 (attached) for detailed requirements, including, but not limited to specific tasks and due dates, and semiannual progress reports due August 1 and February 1 of each year. The first semiannual Time Schedule Order progress report is due August 1, 2026.

If you have any questions, please contact Cecile Blancarte at (805) 542-4789 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

City of Santa Maria WWTP - 2 - February 5, 2026
Sincerely,
for Ryan E. Lodge
Executive Officer
Attachment: Time Schedule Order R3-2026-0009
cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Chrisos Stoyos, City of Santa Maria, [email protected] Michelle Yankee, City of Santa Maria, [email protected] Graham Juby, Carollo, [email protected]
Lydia Holmes, Carollo, [email protected]
Rajesh Doppalapudi, Carollo, [email protected]
Rosemary Smud, Carollo, [email protected]
Jason Johnston, Santa Barbara County, [email protected] Angela Schroeter, Central Coast Water Board, [email protected] Sophie Froelich, Central Coast Water Board, [email protected] Kelsey DeLong, Central Coast Water Board, [email protected] Todd Stanley, Central Coast Water Board, [email protected] Tamara Anderson, Central Coast Water Board, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
ECM/CIWQS = CW-255678
GeoTracker = GT-WDR100029526
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant, Time Schedule Order
R:\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\8_TSO\Final\coverletter_TSO.docx

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX M CLIMATE CHANGE ADAPTATION PLAN

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Climate Change Adaptation Plan
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Climate Change Adaptation Plan
FINAL / October 2026
Digitally signed by Lydia A. Holmes
Contact Info: Carollo Engineers Inc.

Date: 2026.10.21 15:20:50-07'00'
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.21 18:19:32-07'00'

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Climate Change Adaptation Plan/ClimateChangeAdaptationPlan.docx Contents
SECTION 1 INTRODUCTION 1

1.1 Purpose and Objectives 1

1.2 Santa Maria Wastewater Facilities 1
SECTION 2 HAZARDS AND VULNERABILITIES 3

2.1 Climate Change Hazards 3

2.1.1 Sea Level Rise 4

2.1.2 Precipitation Pattern Changes 6

2.1.3 Temperature Fluctuations and Extremes 12

2.1.4 Increased Wildfires 15

2.1.5 Increased Power Outages 17

2.1.6 Summary of Climate Change Hazards 18

2.2 Vulnerability Assessment 19

2.2.1 Methodology for Assessing Vulnerability 19

2.2.2 Vulnerability Assessment Results 21

2.2.3 Vulnerability Assessment Summary 24
SECTION 3 RESILIENCY ACTIONS 25
SECTION 4 ADAPTATION STRATEGY 26

4.1 Prioritization of Resiliency Actions 27

4.2 Schedule and Milestones for Selected Actions 28

4.3 Financial Planning 29
SECTION 5 RECYCLED WATER FEASIBILITY PLAN 30
Tables
Table 1 Summary of Temperature Extremes for Santa Maria 15 Table 2 KBDI Values and Corresponding Wildfire Risk Levels 17 Table 3 Summary of Climate Change Hazards in Santa Maria 18 Table 4 Sensitivity Rating Scale 20
Table 5 Adaptive Capacity Rating Scale 20
Table 6 Vulnerability Scoring 20
Table 7 Vulnerability Rating Scale 20
Table 8 Vulnerability Assessment - Sea Level Rise 21
Table 9 Vulnerability Assessment - Precipitation Pattern Changes 22 Table 10 Vulnerability Assessment - Drought 22
Table 11 Vulnerability Assessment - Flooding 23
Table 12 Vulnerability Assessment - Extreme Temperatures 23 Table 13 Vulnerability Assessment - Increased Wildfires 24 Table 14 Vulnerability Assessment - Increased Power Outages 24

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 15 Vulnerability Assessment - Summary 24
Table 16 Resiliency Actions for the Santa Maria Wastewater System 26 Table 17 Prioritization of Resiliency Actions 27
Table 18 Schedules and Milestones of Resiliency Actions 28 Table 19 Resiliency Actions and Funding Strategy 29
Figures
Figure 1 Santa Maria WWTP 2
Figure 2 Santa Maria Collection System and Lift Station 2 Figure 3 Hourly Sea Level Projections for Port San Luis (RCP 8.5) 5 Figure 4 Projected Sea Level Rise Extents for 2100 6
Figure 5 Santa Barbara County Historical Percent-of-Normal Water Year Rainfall 7 Figure 6 Annual Average Precipitation (RCP 8.5) Historical and Projected for Santa Maria, California 8
Figure 7 Estimated Intensity of Extreme Precipitation Events (RCP 8.5) Historical and Projected for Santa Maria, California 9
Figure 8 Historical Drought Conditions in California 10 Figure 9 California Drought Monitor Map (February 2025) 10 Figure 10 Maximum Length of Dry Spells (RCP 8.5) 11
Figure 11 100-Year Flood Zones in the City's Service Area 12 Figure 12 Annual Average Maximum Temperature (RCP 8.5) 13 Figure 13 Annual Average Minimum Temperature (RCP 8.5) 13 Figure 14 Number of Extreme Heat Days (RCP 8.5) 14
Figure 15 Number of Warm Nights (RCP 8.5) 14
Figure 16 City of Santa Maria Fire Hazard Zones 16
Figure 17 Number of Days with KBDI > 600 (RCP 8.5) 17

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AR6 Sixth Assessment Report
BRIC Building Resilient Infrastructure and Communities
CCAP Climate Change Adaptation Plan
CIP Capital Improvement Program
City City of Santa Maria
CWSRF Clean Water State Revolving Fund
degrees F degrees Fahrenheit
FEMA Federal Emergency Management Agency
GCM global circulation models
I&I inflow and infiltration
IPCC Intergovernmental Panel on Climate Change
KBDI Keetch-Byram Drought Index
MRP Monitoring and Reporting Program
PPA Power Purchase Agreement
PPP Public-Private Partnerships
RCP Representative Concentration Pathway
SRF State Revolving Fund
WWTP wastewater treatment plant

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
SECTION 1 INTRODUCTION
Global temperatures have risen over the last century, a trend that is predicted to continue. The increase in temperature creates changes to weather patterns, which can lead to sea level rise, environmental hazards, and extreme hydrological events.

As required by their General Order Waste Discharge Permit and Monitoring and Reporting Program (MRP), the City of Santa Maria (City) has developed a Climate Change Adaptation Plan (CCAP) as a guide in the assessment and identification of climate vulnerabilities and development of an adaptation strategy to complete resiliency actions for its wastewater system.

1.1 Purpose and Objectives
This CCAP is intended to identify climate change hazards, assess the City's wastewater systems' vulnerability to the identified hazard, and provide resiliency actions and adaptation strategies to mitigate consequences associated with climate change hazards.

The key objectives of the CCAP are to:
 Identify climate change hazards to the City's wastewater systems.  Assess the wastewater systems vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the wastewater system.  Identify actions to build wastewater systems and operational resilience to identified vulnerabilities.  Develop and implement an adaptation strategy to complete resiliency actions.  Develop a Recycled Water Feasibility Plan that will assess the viability of using the wastewater system's treated effluent for beneficial reuse.

This report has been configured to comply with the requirements as set out in the MRP No. R3-2023-0032.

1.2 Santa Maria Wastewater Facilities
The City's wastewater facilities include the Santa Maria Wastewater Treatment Plant (WWTP), which consists of a secondary treatment plant and 123 acres of percolation ponds located at 601 South Black Road in the City of Santa Maria. In addition, there is one lift station located in the southern area of the City's 20-square-mile service area and a sewer collection system that includes 250 miles of pipe that conveys wastewater to the WWTP, mostly by gravity.

The Santa Maria WWTP site currently occupies approximately 211 acres and is generally bounded by Route 166 to the north, Ray Road on the west, and Black Road to the east. The WWTP site elevation is approximately 150 feet above mean sea level. Figure 1 shows a portion of the Santa Maria WWTP site, which includes secondary treatment facilities, process buildings, sludge drying beds, and percolation ponds.

The City's collection system, as well as the one wastewater lift station, is shown in Figure 2.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
Figure 1 Santa Maria WWTP
Figure 2 Santa Maria Collection System and Lift Station

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3
SECTION 2 HAZARDS AND VULNERABILITIES
Globally, the average temperature has increased about 1.7 degrees Fahrenheit (degrees F) since 1970. This warming of our planet has caused a shift in weather patterns, generating climate hazards, which create vulnerabilities for wastewater facilities. In this section, current climate change hazards related to the City's wastewater facilities are identified, and a vulnerability assessment for each of these hazards is performed.

2.1 Climate Change Hazards
The five major climate change hazards or events that are to be evaluated and that may impact the City's wastewater system are as follows:
 Sea Level Rise.
 Precipitation Pattern Changes.
 Temperature Fluctuations and Extremes.
 Wildfires.
 Power Outages.

For each of these climate hazards, impacts were evaluated for mid-century (2035-2064) and end-century (2070-2099) and compared to baseline modeled history (1961-1990). The climate change predictions for each of the identified hazards were compiled from a review of the following recent data, literature, and research:
 Cal-Adapt 2021:
» Climate data on Cal-Adapt includes maximum temperature, minimum temperature, precipitation, sea-level rise, and wildfire. The effects of climate change in the City's service area were projected using conditions defined in the Representative Concentration Pathway (RCP) 8.5 scenarios, as developed by the Intergovernmental Panel on Climate Change (IPCC). IPCC uses RCPs to describe the different degrees of climate change. RCP 8.5 assumes a business-as-usual scenario with no reduction in greenhouse gases and is the chosen basis for City-wide climate change adaptation related analyses.
 Fifth National Climate Assessment:
» This comprehensive federal report assesses climate change impacts, risks, and adaptation responses across the United States. The report provides long-term climate projections relevant to the City and informs risk assessment for extreme temperatures, drought, and flooding based on national trends. The report also supports decision making for infrastructure resilience by highlighting best practices from across the county.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
 California's Fourth Climate Change Assessment - Central Coast Region Report:
» This report focuses on climate change impacts specific to the Central Coast region, including Santa Barbara and San Luis Obispo counties. It includes localized temperature projections, such as rising temperatures, changing precipitation patterns, and increased wildfire risk.  Climate-Safe Infrastructure Working Group Report:
» This report offers engineering and planning guidance for infrastructure resilience to climate change, focusing on designing and upgrading critical infrastructure to withstand future conditions.

In the following section, each of the identified climate change hazards is evaluated as they pertain to the City's service area.

2.1.1 Sea Level Rise
Earth's climate is changing, ice sheets and glaciers are melting, ocean water is warming and expanding, and sea levels are rising in response. As sea level rise continues, risks from other coastal processes are expected to increase. For example, rising sea levels will lead to more episodic flooding and permanent inundation of low-lying areas that are exposed to high tides, and erode important habitats such as beaches, coastal wetlands, cliffs, and dunes. Higher sea levels will also contribute to rising groundwater tables that will bring saltwater intrusion into freshwater aquifers, increase corrosion of underground infrastructure, mobilize subsurface contaminants, and lead to surface pooling of water (Ocean Protection Council).

There are five sea level scenarios for California derived from the sets of probabilistic projections developed in the IPCC Sixth Assessment Report (AR6) and reflect the most up-to-date scientific understanding of the physical drivers of sea level rise. For the purpose of this analysis on the effects of sea level rise in the City's service area, a High sea level scenario was assumed, corresponding to 6.6 feet of global mean sea level rise by 2100. This scenario only arises with high future emissions and high warming, with large potential contributions from rapid ice sheet loss processes, and is the most conservative estimate scenario for global sea level rise.

To gauge the effect of sea level rise on the City's wastewater service area, future sea level rise scenarios for the Port San Luis National Oceanic and Atmospheric Administration tide gauge were evaluated that included local estimates of vertical land motion produced by the IPCC AR6. From this data, it is estimated that sea levels will rise by 1.1 feet by 2050 and 6.3 feet by 2100 using the High sea level scenario. Figure 3 shows the projected fraction of year that sea level would be over 5.2 feet under the 50th percentile, 95th percentile, and 99.9th percentile Sea Level Rise scenarios (California Ocean Protection Council (Rising Seas)) for the tide gauge station at Port San Luis under the RCP 8.5 scenario (Source: Cal-Adapt).

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5
Figure 3 Hourly Sea Level Projections for Port San Luis (RCP 8.5) Although sea levels are predicted to rise at the closest tide gauge station to the City's service area, the projected extent of sea level rise effects, even under the worst-possible scenario, is not predicted to impact the City directly due to the inland location and elevation above sea level of the City's service area.

Figure 4 shows the extent of projected levels of sea water rise for 2100 in relation to the location of Santa Maria, noted with a star.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6
Figure 4 Projected Sea Level Rise Extents for 2100

2.1.2 Precipitation Pattern Changes
California's climate has historically varied between wet and dry years, as shown in the Percent of Normal Rainfall graph (Figure 5), which depicts the current extensive variability of annual rainfall within Santa Barbara County. These patterns that already happen cyclically will become more extreme under climate change.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 7
Figure 5 Santa Barbara County Historical Percent-of-Normal Water Year Rainfall Figure 6 shows Cal-Adapt projections for present, mid-century, and end-century average annual precipitation for the City's service area for the RCP 8.5 scenario. While the average annual precipitation for the City is not expected to change significantly by the end of the century, precipitation will likely be delivered in more intense storms and within a shorter wet season.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 8
Figure 6 Annual Average Precipitation (RCP 8.5) Historical and Projected for Santa Maria, California Projections show that the wettest day of the year will become wetter relative to historical conditions, with research suggesting that wet years will become wetter, and dry years will become drier. Figure 7 shows the estimated intensity (Return Level) of Extreme Precipitation events, which are exceeded on average once every five years (Return Period) and how these conditions are expected to change in a warming climate over historical, mid-century, and late-century time periods from Cal-Adapt. Extreme precipitation events are days during a water year (October-September) with two-day rainfall totals above an extreme threshold of 0.97 inch.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 9
Figure 7 Estimated Intensity of Extreme Precipitation Events (RCP 8.5) Historical and Projected for Santa Maria, California

2.1.2.1 Drought
Droughts are a natural part of the climate cycle; but as earth's atmosphere continues to warm due to climate change, droughts in California are becoming more frequent, severe, and pervasive. Figure 8 illustrates historical drought conditions in California, with the most extreme drought occurring from 2012 to 2016. Currently, most of California, including Santa Barbara County, are experiencing drought conditions as shown in Figure 9, which are expected to persist throughout the next year.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 10
Figure 8 Historical Drought Conditions in California
Figure 9 California Drought Monitor Map (February 2025)

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 11
Droughts are often characterized by prolonged periods of below-average precipitation and above-average temperatures, resulting in prolonged periods of dry spells and water deficits. Historically, the average length of a dry spell in Santa Maria is 147 days. Cal-Adapt climate projections for Santa Maria show a slight increase in the maximum length of dry spells for each year, or the maximum number of consecutive days with precipitation less than 1 millimeter for each year, averaging 159 days by end-century, as shown in Figure 10.

Figure 10 Maximum Length of Dry Spells (RCP 8.5)
The projected increasing frequency and intensity of droughts in California will ultimately lead to water use restrictions, which can result in higher concentrations of sewage entering wastewater systems. However, even though drought frequency and intensity are expected to increase in California, the City is only projected to see an increase of 12 days in the length of a dry spell by end-century compared to the historical average.

2.1.2.2 Flooding
Severe drought, in combination with projected increases in the intensity of the rain events that do occur, can lead to increased runoff when it rains, resulting in more extreme flooding. Climate projections predict that more precipitation will be falling in fewer, more-intense storm events. This means that the stormwater systems will take in larger amounts of water for a single storm event, which increases the potential for flooding to occur. Figure 11 shows the flood zones located within the City's service area, which are subject to inundation by the 1 percent annual chance flood event.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 12
Figure 11 100-Year Flood Zones in the City's Service Area The yellow star on Figure 11 shows the location of the Santa Maria WWTP, which is far from 100-year flood zones. Therefore, the Santa Maria WWTP has a relatively low risk of flooding even with increased intensity of rain events.

2.1.3 Temperature Fluctuations and Extremes
The City is susceptible to the same weather patterns as other parts of Central and Southern California, and, while most of the time the climate is mild, temperature extremes can and do occur. As planetary warming continues, the severity of weather extremes is predicted to increase. According to the Cal-Adapt climate projections, the annual average maximum and minimum temperatures for Santa Maria are expected to increase into the end of the century as climate change progresses. Figures 12 and 13 show annual average maximum and annual average minimum temperatures, respectively, at present, mid-century, and end-century time periods.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 13
Figure 12 Annual Average Maximum Temperature (RCP 8.5)
Figure 13 Annual Average Minimum Temperature (RCP 8.5)
Cal-Adapt also projects an increase in the number of extreme heat days, which are the number of days that exceed the 98th percentile of historical maximum temperatures, 90.9 degrees F, between April 1 and October 31 based on observed daily temperature data from 1961-1990. As shown in Figure 14, the number of extreme heat days per year in Santa Maria is expected to increase throughout the mid- and end-century.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 14
Figure 14 Number of Extreme Heat Days (RCP 8.5)
Additionally, extreme heat days and warm nights have become more frequent since 1950. Cal-Adapt projects an increase in the number of warm nights through the end of the century, which are the number of days in a year when the daily minimum temperature is above a threshold temperature of

58.7 degrees F. As shown in Figure 15, Santa Maria is expected to see an increase in the number of warm nights per year by the end of century.

Figure 15 Number of Warm Nights (RCP 8.5)
Although the City is expected to see an increase in temperatures as global warming continues, even under the worst-possible scenario, the impact on the City's wastewater service area is minimal. Even with the projected increase in temperatures for the City's service area, temperatures will not pose a threat to

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 15
wastewater facilities and their operation. Table 1 summarizes the projected temperature extremes for the City's service area based on the information presented in Figures 12 through 15.

Table 1 Summary of Temperature Extremes for Santa Maria Temperature Extreme Baseline
(1961-1990)(1)
Mid-Century
(2035-2064)(1)
End-Century
(2070-2099)(1)
Average Annual Maximum Temperature 69.4 degrees F 73.5 degrees F 76.5 degrees F Average Annual Minimum Temperature 46.2 degrees F 50.3 degrees F 53.3 degrees F Number of Extreme Heat Days 2 days 5 days 12 days
Number of Warm Nights 8 nights 39 nights 80 nights
Notes:
(1) Represents the average of the most likely outcome over a 30-year period based on RCP 8.5 scenario.

2.1.4 Increased Wildfires
The City of Santa Maria has several areas within mapped Fire Hazard Severity Zones and Wildland-Urban Interface areas. Figure 16 shows the fire hazard map from Cal-Fire for the City, illustrating the level of wildfire threat throughout the City's service area. In general, Figure 16 shows the City's wastewater service area is in a low-risk fire hazard area due to its location in the valley. However, the hills surrounding the valley, shown in red in the Figure, have a higher risk of wildfire. The star in Figure 16 is the location of the WWTP.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 16
Figure 16 City of Santa Maria Fire Hazard Zones
A changing environment means higher temperatures and a drier atmosphere, creating conditions that are prime for wildfires to spread. The frequency, severity, and impacts of wildfire are sensitive to climate change as well as many other factors, including development patterns, temperature increases, wind patterns, and precipitation change. Therefore, it is more difficult to project exactly where and how fires will burn. Instead, climate models estimate an increased risk for wildfires.

The Keetch-Byram Drought Index (KBDI) represents a simplified proxy for favorability of occurrence and spread of wildfire. The KBDI incorporates climate data from global circulation models (GCMs) like changing temperature and precipitation patterns to describe soil moisture deficit, as research and history consistently demonstrate that hot and dry conditions are conductive to wildfires. The KBDI scale captures heat and moisture conditions, ranging from 0 to 800, with lower scores indicating higher levels of soil saturation and low wildfire risk and higher scores indicating soil moisture deficits and high wildfire risk.

Table 2 summarizes the wildfire risk for KBDI values.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 17
Table 2 KBDI Values and Corresponding Wildfire Risk Levels KBDI
Value
Description Wildfire Risk
0-200 Soil moisture and fuel
moistures are high
Low wildfire risk.
200-400 Soil and fuels start to dry Average wildfire risk. 400-600 Onset of drought Moderate to serious wildfire risk. 600-800 Severe drought Extreme wildfire risk and increased wildfire occurrence.

KBDI values greater than 600 can help to provide a high-level evaluation of whether wildfire activity is likely to increase. Figure 17 shows Cal-Adapt projections for the number of days with KBDI values greater than 600 for present, mid-century, and end-of-century for the City of Santa Maria.

Figure 17 Number of Days with KBDI > 600 (RCP 8.5)
Although the City's wastewater service area is in a low-risk fire hazard area, the City and the surrounding area can expect to see an increase in the number of days with KDBI values greater than 600, representing the number of days with extreme wildfire risk and increased wildfire occurrence, through end-of-century.

2.1.5 Increased Power Outages
Power outages from extreme weather are increasing across the United States. The average number of major power outages (exceeding 50,000 customers) increased by roughly 64 percent during 2011-2021.

Extreme heat events are increasing in frequency and duration, and high temperatures increase powerline sagging and reduce the efficiency of transmission and distribution, stressing the grid during periods of increased demand.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 18
The City receives all commercial power from Pacific Gas and Electric and is near the end of its distribution system, making it more susceptible to power disruptions (as any failure is more likely to occur between the end and the origin(s) of the system). The Santa Maria WWTP facility operations are dependent on power generation and distribution networks and are vulnerable to operation failures, extreme storm events, and high demand periods that may cause brownouts or blackouts. The City currently has full capability to provide generator power to operate the Santa Maria WWTP during a prolonged power outage. Additional measures to provide backup power may be needed in the future due to the predicted increase in power outages.

2.1.6 Summary of Climate Change Hazards
Table 3 summarizes the range of climate change hazards in the City's service area that were evaluated in the preceding sections.

Table 3 Summary of Climate Change Hazards in Santa Maria Hazards Projected Trends
Sea Level Rise  +1.1 feet by 2050
 +6.3 feet by 2100
Precipitation
 Average annual precipitation:
» +0.9 inch mid-century
» +2.4 inch end-century
 Increase in intensity of extreme precipitation events Drought
 Maximum length of dry spell:
» +7 days mid-century
» +12 days end-century
 Increasing intensity of drought conditions
 Increasing frequency and duration of dry weather conditions Flooding  100-year flood increase near rivers
 Increase in intensity of extreme precipitation events Extreme Temperatures
 Increase in maximum temperatures
 Increase in minimum temperatures
 Increase in extreme heat days
 Increase in number of warm nights

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 19
Hazards Projected Trends
Wildfires
 City of Santa Maria:
» 14 days with extreme wildfire risk by mid century
» 42 days with extreme wildfire risk by end century
Power Outages  More frequent power outages.

2.2 Vulnerability Assessment
The vulnerability assessment evaluated the degree to which each of the City's wastewater systems is susceptible to, and unable to handle, each of the identified climate change hazards. The vulnerability assessment was performed for current and historical conditions to establish the current vulnerabilities as well as for future conditions, incorporating climate change, to estimate future vulnerabilities. The City's Local Hazard Mitigation Plan and the Santa Barbara County Multi-Jurisdictional Hazard Mitigation Plan provided additional information on assessing the vulnerability of the City's service area.

2.2.1 Methodology for Assessing Vulnerability
The methodology for assessing the vulnerability of the City's wastewater systems follows the process recommended by the California Governor's Office of Emergency Services, as documented in the 2020 California Adaptation Planning Guide and the Climate Adaptation Guide by the California Department of Water and Resources. The process of assessing vulnerability has four steps: exposure, sensitivity, adaptive capacity, and vulnerability scoring. These steps are described below.

2.2.1.1 Exposure
The first step of the vulnerability assessment involves identifying the specific climate hazards that could impact the City's wastewater systems. This is accomplished by describing historical hazards and describing how these hazards are expected to change. This step is described in Section 2.1 of this CCAP and summarized in Table 2.

2.2.1.2 Sensitivity
The goal of the second step of the vulnerability assessment is to characterize past and potential future climate impacts to the City's wastewater treatment processes and/or critical structures at the WWTP. Key considerations include the aging infrastructure of facilities at the WWTP, operational capacity, and energy dependence. The sensitivity of the system to current climate and climate changes is assessed through a three-point rating scale ranging from low to high. The sensitivity rating is based on the responsiveness of the system to changes in climate without consideration of the ability to adapt. Table 4 defines the rating scale for sensitivity.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 20
Table 4 Sensitivity Rating Scale
Level Descriptor Description
1 Low Climate and climate changes have little to no influence on asset or operations. 2 Moderate Climate and climate changes have influence on asset or operations. 3 High Climate and climate changes have high influence on asset or operations.

2.2.1.3 Adaptive Capacity
The adaptive capacity is assessed based on the ability of the current wastewater system, operations, or management to adapt with little or no changes in the current system function or operational/management structure. Factors influencing adaptive capacity include infrastructure upgrades, resources availability, and institutional support. As with the sensitivity rating, a three-point rating scale is also used for adaptive capacity. Table 5 defines the rating scale for adaptive capacity.

Table 5 Adaptive Capacity Rating Scale
Level Descriptor Description
1 Low System component has little inherent capacity to adapt to climate induced changes. 2 Medium System component has some inherent capacity to adapt to climate induced changes. 3 High System component has substantial inherent capacity to adapt to climate induced changes.

2.2.1.4 Vulnerability Scoring
The combined rating of sensitivity and adaptive capacity results in an assessment of vulnerability.

A system component that is highly sensitive (High) to climate changes and has little adaptive capacity (Low) represents a high vulnerability. However, not all system components that show high sensitivity to climate are considered highly vulnerable. If substantial operational flexibility exists to adapt to such changes, then the component may be considered to have only low to moderate vulnerability. Table 6 illustrates how the sensitivity and adaptive capacity scores lead to a vulnerability score, and Table 7 defines the scale that was used to score vulnerability.

Table 6 Vulnerability Scoring
Sensitivity
Adaptive Capacity
Low = 1
Low = 1 Moderate = 2 High = 3
M H H
Moderate = 2 L M H
High = 3 L L M
Table 7 Vulnerability Rating Scale
Descriptor Description
Low Minimal risk, existing systems can manage the impact of climate change.

Moderate Noticeable risk, infrastructure upgrades, or operations may need improvements.

High Immediate or severe risk, current systems cannot manage the impact without major adaptation.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 21

2.2.2 Vulnerability Assessment Results
The following sections summarize the results of the vulnerability assessment performed on each of the identified climate change hazards for the City's service area.

2.2.2.1 Sea Level Rise
Climate change projections for sea level rise in Santa Barbara County estimate an increase of 6.3 feet by 2100. However, the Santa Maria WWTP is located 10 miles inland from the coastline and sits at an elevation of 150 feet above mean sea level. Therefore, future sea level rise is not anticipated to impact the WWTP directly. Projected indirect impacts to the WWTP include increased groundwater levels that could slow infiltration rates of the percolation ponds and the potential for saltwater intrusion affecting local groundwater quality. In areas within the City's service area with high groundwater, infiltration could increase into sewer lines. Table 8 details the results of the vulnerability assessment performed for sea level rise.

Table 8 Vulnerability Assessment - Sea Level Rise
Assessment Score Justification
Sensitivity 1
Low
The plant is 10 miles inland and 150 feet above mean sea level, reducing direct risks.

Adaptive Capacity 2
Moderate
Groundwater monitoring wells are in place to monitor groundwater levels, and adjustments to effluent discharge methods can be developed in the future, if needed.

Vulnerability Score Low
Minimal risk, existing groundwater monitoring wells can monitor groundwater and adjustments to existing disposal methods (if needed) can manage the indirect impact of sea level rise.

2.2.2.2 Precipitation
Climate change projections for annual precipitation in the City's service area indicate an increase of

2.4 inches of rain annually by end of the century and an increase in the intensity of rain events. This increase could lead to increased inflow and infiltration (I&I) during heavy rainfall events, potentially overwhelming the primary and secondary treatment capacity of the WWTP and impacting the existing percolation ponds. Additionally, the increased I&I can lead to sanitary sewer overflows in the City's service area. Table 9 details the results of the vulnerability assessment performed for precipitation pattern changes.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 22
Table 9 Vulnerability Assessment - Precipitation Pattern Changes Assessment Score Description
Sensitivity 2
Moderate
An increase in precipitation will cause an increase in I&I during heavy rainfall events. The collection system is potentially susceptible to sanitary sewer overflows, and peak flows could overwhelm screening capacity at the headworks, lower solids settling efficiency in primary clarifiers, and disrupt biological treatment. Low evaporation and higher flows during rainfall events may require additional disposal capacity than currently available.

Adaptive Capacity 2
Moderate
The existing WWTP infrastructure has capacity to deal with excess raw sewage inflows, however the existing percolation ponds have limited capacity to provide long term additional storage after extreme precipitation events. As part of the plant expansion, plant treatment processes and hydraulics will be designed for increased projected wet weather flows, and additional percolation ponds will be constructed at the WWTP for additional disposal capacity.

Vulnerability Score Moderate
On the treated effluent side, additional percolation ponds will provide additional volume that can be used during extreme precipitation events. The City's collection system is potentially susceptible to sanitary sewer overflows during heavy rainfall due to the increase in intensity of rainfall events. The collection system may require improvements to convey higher flows.

2.2.2.3 Drought
Climate change projections indicate that California will continue to experience more frequent and intense droughts through the end of the century. Additionally, the intensity, frequency, and duration of dry weather conditions are expected to increase. In the City's service area, the maximum length of a dry spell is expected to increase by 12 days by the end of the century. Extended periods of drought have the potential to reduce influent flow rates to the WWTP, concentrating sewage and challenging treatment efficacy, and may cause potential regulatory shifts toward reuse and conservation mandates. Table 10 details the results of the vulnerability assessment performed for drought.

Table 10 Vulnerability Assessment - Drought
Assessment Score Description
Sensitivity 3
High
During drought conditions, the population uses less water, leading to higher sewer concentrations entering the Santa Maria WWTP. High sewage concentration can stress the treatment capacity of the secondary treatment system.

Adaptive Capacity 3
High
California has experienced drought many times in the last century. Thus, the Santa Maria WWTP is sized to adapt to drought conditions. Additionally, the City is only expected to see an increase of 12 days in the length of dry spells.

Vulnerability Score Moderate
Existing infrastructure has been sized to adapt to drought conditions, and the projected increase in the length of dry spells is not anticipated to increase greatly. As part of the plant expansion, plant treatment processes will be designed for organic and nutrient loads based on a range of anticipated influent flow and concentration, including drought conditions.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 23

2.2.2.4 Flooding
Climate change projections indicate that the intensity of precipitation events is expected to increase by the end of the century, which can lead to coastal and river flooding. Historically, the Santa Maria WWTP has never experienced flooding because the WWTP sits above flood-prone areas. However, the WWTP may experience localized flooding due to an increase in the intensity of precipitation events, which can damage infrastructure and disrupt treatment operations. Table 11 details the results of the vulnerability assessment performed for flooding.

Table 11 Vulnerability Assessment - Flooding
Assessment Score Description
Sensitivity 1
Low
The WWTP is located at a higher elevation than flood-prone areas and is not located in a flood zone.

Adaptive Capacity 2
Moderate
The City has a stormwater management plan and an emergency response plan for severe weather and flooding.

Vulnerability Score Low
As part of the plant expansion, existing and new electrical equipment at the WWTP will be evaluated to confirm that it is elevated sufficiently to prevent localized flooding of equipment.

2.2.2.5 Extreme Temperatures
Climate change projections indicate that the City's service area is expected to see an increase in maximum temperatures and an increase in minimum temperatures as the century progresses. An increase in the number of extreme heat days and number of warm nights is also expected to increase. However, as shown in Table 1, the projected temperatures are not very high and do not pose a threat to the WWTP facilities or operations. Table 12 details the results of the vulnerability assessment performed for extreme temperatures.

Table 12 Vulnerability Assessment - Extreme Temperatures Assessment Score Description
Sensitivity 1
Low
The projected maximum temperatures in the City's service area are not very high and are not anticipated to affect the WWTP.

Adaptive Capacity 2
Moderate
The WWTP process is not significantly impacted by increases in ambient temperature and has limited ability to control temperature. The rise in temperatures will not necessitate any additional actions.

Vulnerability Score Low Although an increase in temperature is anticipated, the projected maximum temperatures will not necessitate any additional actions.

2.2.2.6 Increased Wildfire
Climate change projections indicate that the City will have more days with high wildfire risk (KBDI > 600) annually as the century progresses. However, because the City's service area is located within a low fire risk hazard zone, an increase in wildfire occurrence does not pose a threat to the wastewater system.

Table 13 details the results of the vulnerability assessment performed for increased wildfires.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 24
Table 13 Vulnerability Assessment - Increased Wildfires Assessment Score Description
Sensitivity 1
Low The City's service area is located in an area of low wildfire risk.

Adaptive Capacity
2 Moderate
Wildfires can lead to increased power outages; however, existing backup generators and new renewable energy projects (solar panels) can reduce risks.

Vulnerability Score Low
The City already has full backup power available for the existing WWTP. Full backup power will be commissioned as part of the new WWTP upgrade, along with additional energy management systems. No additional actions will be needed.

2.2.2.7 Increased Power Outages
As temperatures become warmer, drought conditions intensify, wildfires become more frequent, and the number of power outages is expected to increase. This has the potential to lead to WWTP plant shutdowns causing permit violations, loss of aeration, pumping and chemical dosing systems, and potential effluent quality deterioration. Table 14 details the results of the vulnerability assessment performed for increased power outages.

Table 14 Vulnerability Assessment - Increased Power Outages Assessment Score Description
Sensitivity 3
High
The WWTP relies on consistent power. Higher temperatures and other conditions associated with climate change could increase the frequency of power outages.

Adaptive Capacity 3
High
The existing backup generator is sufficient to power the entire WWTP facility during a power outage, and there is onsite fuel to refuel the generator. The upgraded WTP facility will be designed and constructed to have sufficient backup power resources to mitigate risks associated with power outages.

Vulnerability Score Moderate
The City has a standby generator for backup power for the entire WWTP facility and emergency response procedures for power outages. This backup power source will not be sufficient to meet the power needs of the WWTP upgrade, but the City is planning to include sufficiently sized standby generator(s) as part of the Phase 1 plant expansion.

2.2.3 Vulnerability Assessment Summary
Table 15 summarizes the results of the vulnerability assessment and organizes the City's wastewater system's vulnerability to the identified climate change hazards from high to low vulnerability.

Table 15 Vulnerability Assessment - Summary
Hazard Vulnerability
Rating Rational
Increased Power
Outages
Moderate  The City has a planned project to add solar power and, as part of the master planning effort, is considering other renewable energy options and backup generators sufficient for providing backup power for the new facilities.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 25
Hazard Vulnerability
Rating Rational
Increased
Precipitation
Moderate  The City has a robust sewer line cleaning and inspection program outlined in the adopted Sewer System Management Plan. As part of the cleaning and inspection program, the City routinely finds and reports issues, some of which can be attributed to increasing I&I. Once the issue has been identified and confirmed, repairs are performed. If the issue is a greater item of concern than a spot repair, then that issue is developed into a capital replacement project. Additionally, the City utilizes a third-party consultant to assist with sewer modeling and utility capacity. An element of the modeling and capacity evaluation is monitoring flows both during dry and rainy seasons to help inform the City of the impacts of I&I. As part of the continued evaluation, the City can monitor and address I&I. If monitoring and modeling demonstrate significant I&I issues, then the City can evaluate the need for developing a future I&I program.  Additional percolation ponds planned as part of the Master Plan will increase disposal capacity for treated effluent.
 New facilities will be designed to handle projected peak influent flows.

Drought Moderate  Forecasted drought conditions are not anticipated to be significantly different from the present, in terms of number of dry days per year.  Forecasted drought conditions are not expected to have a significant impact on the existing or future WWTP infrastructure needs.  New facilities will be designed to handle projected organic and nutrient loads.

Floods Low  The Santa Maria WWTP has never experienced flooding due to its elevation.
 Existing and new electrical equipment at the WWTP will be evaluated to confirm that it is elevated sufficiently to prevent localized flooding of equipment.

Extreme
Temperatures
Low  Extreme temperatures are unlikely to have a significant impact to the existing WWTP infrastructure.

Increased Wildfire Low  The City's service area is located in a low fire hazard area.

Sea Level Rise Low  The City's service area is located far from the coast at an elevation of more than 160 feet above mean sea level, so there is no direct risk.

SECTION 3 RESILIENCY ACTIONS
The Santa Maria WWTP faces increasing climate hazards, including precipitation pattern changes, flooding, drought, extreme temperatures, wildfires, and power outages. For each of the climate change hazards that the City's wastewater service area is moderately vulnerable to, resiliency actions have been identified. The resiliency actions described in Table 16 have been identified to enhance system resilience while minimizing resource impacts to provide continued operation, protect water quality, and comply with regulatory requirements.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 26
Table 16 Resiliency Actions for the Santa Maria Wastewater System Resiliency Action Hazards
Addressed Description of Action
Update Collection
System Model and
CIP with projects to
reduce I&I as needed
Increased
Precipitation
 The City has an ongoing project to update the collection system hydraulic model. This new model will identify any sections of the collection system that are under capacity for dealing with projected high flows.  A CIP will be developed for improvements required in the collection system to address capacity limitations and to address Inflow and Infiltration (I&I) that may contribute to capacity limitations.

Backup Power
Upgrades
Power Outages,  The Santa Maria WWTP currently has a backup generator that can provide power to the whole plant during power outages. Additionally, the WWTP and the City have fueling capabilities to provide fuel to the generator for extended power outages.
 As part of the Phase 1 plant expansion Master Plan, the City is conducting an Energy Management evaluation that will consider future resiliency, backup generator(s) to provide power for the entire facility, and alternatives for renewable energy to address increasing and extended power outages.

WWTP Upgrades Increased
Precipitation,
Drought
 Currently, the WWTP has an hydraulic capacity of 13.5 million gallons per day.
 As part of the Phase 1 plant expansion, the existing infrastructure will be updated or replaced to provide additional capacity for projected wet weather flows and additional concentrations of sewage during drought.  Additional percolation ponds are planned as part of the Phase 1 plant expansion for increased disposal capacity.
 Drainage improvements to increase capacity of onsite storm drains will also be completed as part of this project.

Emergency
Response Plan
Power Outages,  Emergency plans and procedures can assist in increasing the resilience of the WWTP.
 The existing WWTP's 2024 Operations and Maintenance Manual incorporates an Emergency Response Program, which includes responses and procedures for power outages.
 The WWTP upgrade project would include an updated Operations and Maintenance Manual with an Emergency Response Plan that would include responses and procedures for power outages.

Notes:

CIP - capital improvement program
SECTION 4 ADAPTATION STRATEGY
Adaptation is the process of making changes in response to current or future conditions. Based on the results of the vulnerability assessment and the resiliency actions described in Section 3, an adaptation strategy was developed.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 27

4.1 Prioritization of Resiliency Actions
The prioritization of the identified resiliency actions was based on the following:
 Risk to Water Quality - The risk to water quality assessed how urgently the identified resiliency action needs to be implemented to prevent regulatory non-compliance or system failures associated with climate change hazards. The higher the risk to water quality, the higher the potential for system failure, service disruption, permit violations, or contamination risks if the resiliency action is not implemented, and the greater the urgency of resiliency action.  Cost-Benefit Analysis - The cost-benefit analysis evaluates the economic, environmental, and operational impacts of implementing climate resiliency actions. The analysis compares implementation and sustaining costs against anticipated benefits including: avoiding damages, improved water quality, regulatory compliance, and improved operational efficiency over a 25-year time frame.

Table 17 lists the prioritization of resiliency actions.

Table 17 Prioritization of Resiliency Actions
Priority Resiliency Action Risk to Water Quality Cost-Benefit Analysis 1 WWTP Upgrades Very High
Aging infrastructure reduces
treatment efficiency, increasing
effluent quality risks.
 Cost: Current Estimate for Phase 1 is $485
million.
» Includes upgrading and replacing structures
as part of the Phase 1 expansion project.
 Estimated Benefit: Significant due to improved
treatment efficiency lending to improved water
quality and a lower possibility of water quality
violations and reduced failures.
 Cost-Effectiveness = High
2 Backup Power
Upgrades
High
Ensures plant operation during
power outages, reducing risk of
bypass.
 Cost: Included in Phase 1 Project lists above.
» Cost for backup power and emergency
generators.
 Estimated Benefit: Significant due to avoided
operational disruptions, emergency repairs and
regulatory violations.
 Cost-Effectiveness = High
3 Update Collection
System Model and CIP,
which incorporates
monitoring and
evaluation of I&I and
development of CIP for
I&I issues as needed
High
More intense storm events can
cause high I&I rates, which can
lead to sanitary sewer
overflows. Model will identify
risk areas. If identified, CIP will
lay out projects to address
capacity deficiencies and I&I
reduction.
 Cost: $450,000
» Cost for recalibration of water and sewer
models, surveying of manholes, and an
updated utilities capacity study.
 Estimated Benefit: Significant due to identifying
areas within the collection system where
improvements could be made to avoid possible
sanitary system overflows.
 Cost-Effectiveness = High

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 28
Priority Resiliency Action Risk to Water Quality Cost-Benefit Analysis 4 Emergency
Preparedness and
Response Plan
Moderate
Enhances staff readiness,
minimizing disruptions.
 Cost: To develop a new Emergency Response
Program chapter of the O&M Manual for the new
Phase 1 project would be included in the overall
cost of the Phase 1 project. An annual cost of
$5,000 to train staff would be on-going and
incorporated as part of the normal operating
budget.
» Includes creating and updating emergency
response program in the WWTP O&M
Manual for the Phase 1 project.
» Annual staff training on the Emergency
Response Program.
 Estimate Benefit: Significant because it will
prepare plant staff to better deal with crisis
response situations.
 Cost-Effectiveness = High

4.2 Schedule and Milestones for Selected Actions
The implementation schedule outlines the timeline for implementing each prioritized resiliency action, considering climate change hazards, critical milestones, and potential triggers for climate related events that may necessitate acceleration or re-prioritization of certain actions and is summarized in Table 18.

Table 18 Schedules and Milestones of Resiliency Actions Resiliency Action Milestone Target Completion
Date Description
Emergency
Preparedness and
Response Plan
Develop emergency response
procedures
At commissioning of
WWTP Phase 1
Upgrades
Update emergency procedures to
handle power outages, flooding,
wildfire, etc. to be current with the
WWTP Upgrades project.

Backup Power
Upgrades
Install emergency generator(s) at
WWTP for Phase 1 Project
At commissioning of
WWTP Phase 1
Upgrades
As part of WWTP Upgrades
project
Update Collection
System Model and CIP
with projects to reduce
I&I as needed
Complete identification and
assessment of collection system
Approximately
2 years from
completion of City's
General Plan
Update
Evaluate which sections of the
collection system are under
capacity to deal with future
projected flows.

Develop CIP Approximately
2 years from
evaluation of
system.

CIP for improvements to the
collection system will be
completed.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 29
Resiliency Action Milestone Target Completion
Date Description
WWTP Upgrades Complete Master Plan 2026 Develop planning documents necessary for upgrades. Include
climate resilience considerations
in plan.

Design 2029 Preparation of Construction
Documents. Include climate
resilience considerations in
design.

Construction 2033 Complete installations, validate
operations, and conduct
functional testing of the upgraded
system.

4.3 Financial Planning
To minimize financial burden, the City should pursue a multi-source funding approach, combining federal, state and local sources. Table 18 outlines the identified resiliency actions, projected costs (both for implementation and sustaining), potential funding sources, and the funding strategy to secure necessary resources.

Table 19 Resiliency Actions and Funding Strategy
Resiliency Action
Estimated
Implementation
Cost
Estimated
Annual
Sustaining Cost
Potential Funding
Sources Funding Strategy
WWTP Upgrades
(Including Backup
Power Upgrades and
Emergency
Preparedness and
Response Plan)
$485 million
Backup Power
Upgrades -
$20,000
 FEMA BRIC
program
 Utility PPA
 Public-Private
Partnerships (PPP)
 Work on applying for grants
or consider PPP or PPAs.
 Annual costs would be part of
the operating budget.

Emergency
Preparedness
and Response
Plan - $5,000
 City Biannual
Budget
 Integrate costs into annual
operations and maintenance
budget.

Annual O&M
Costs for
Phase 1 Project -
$5 million
 User Rate
Adjustments
 Conduct a Cost-of-Service
Study to identify rate
adjustment needs.

CLIMATE CHANGE ADAPTATION PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 30
Resiliency Action
Estimated
Implementation
Cost
Estimated
Annual
Sustaining Cost
Potential Funding
Sources Funding Strategy
Update Collection
System Model and CIP $450,000
Cost to
implement CIP
per year is
unknown and
variable.
 SRF
 Local Bonds
 Growth Mitigation
 City Biannual
Budget
 Apply for low-interest SRF
loans.
 Integrate upgrades into city
budget.

Notes:

BRIC - Building Resilient Infrastructure and Communities; CWSRF - Clean Water State Revolving Fund; FEMA - Federal Emergency Management Agency; PPA - Power Purchase Agreement; PPP - Public-Private Partnerships; SRF - State Revolving Fund
SECTION 5 RECYCLED WATER FEASIBILITY PLAN
The recycled water feasibility plan required as part of this report was prepared and is included in the Master Plan, Volume 7 - Water Reuse and Liquid Disposal.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX N POTENTIAL FUTURE REGULATIONS FOR

PERCOLATION POND OPERATION
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN N-1
Constituent Beneficial Uses That
Apply to Each
Constituent
Current Water Quality Objectives Future Water Quality Objectives

MUN AGR
(irrigation)
AGR
(livestock)
Units MUN AGR Units
Phenol MUN 0.6 (NL-archive)

2.0 (HA)
-- -- mg/L -- -- --
Formaldehyde MUN 0.1 (NL) -- -- mg/L -- -- --
Zinc MUN, AGR 5.0 (Secondary MCL) 2 25 mg/L -- -- --
Chromium VI MUN -- -- -- -- 0.01 (Primary MCL) -- mg/L
Mercury MUN, AGR 0.002 (Primary MCL) -- 0.01 mg/L Under Development
-- --
Selenium MUN, AGR 0.05 (Primary MCL) 0.02 0.05 mg/L -- -- -- TTHMs (bromoform, chloroform, DBCM,
DCBM)
MUN 0.08 (Primary MCL) -- -- mg/L Under
Development
-- --
HAA5 (monochloroacetic acid,
dichloroacetic acid, trichloroacetic acid,
monobromoacetic acid, dibromoacetic acid)
MUN 0.060 (Primary MCL) -- -- mg/L Under
Development
-- --
Bromate MUN 0.01 (Primary MCL) -- -- mg/L Under
Development
-- --
Chlorite MUN 1.0 (Primary MCL) -- -- mg/L Under
Development
-- --
Aluminum MUN, AGR 1.0 (Primary MCL) 5.0 5.0 mg/L -- -- -- Manganese MUN, AGR 0.05 (Secondary MCL)

0.5 (NL)

0.2 -- mg/L 0.02 (NL)

0.20 (RL)
-- mg/L
Perchlorate MUN 0.001 (PHG) -- -- mg/L Under
Development
-- --
MTBE MUN 0.013 (Primary MCL) -- -- mg/L -- -- --
Arsenic MUN, AGR 0.010 (Primary MCL) 0.1 0.2 mg/L Under Development
-- --
Cadmium MUN, AGR 0.005 (Primary MCL) 0.01 0.05 mg/L Under Development
-- --
NDMA MUN 0.00001 (NL) -- -- mg/L Under
Development
-- --
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN N-2
Constituent Beneficial Uses That
Apply to Each
Constituent
Current Water Quality Objectives Future Water Quality Objectives

MUN AGR
(irrigation)
AGR
(livestock)
Units MUN AGR Units
Styrene MUN 0.1 (Primary MCL) -- -- mg/L Under
Development
-- --
1,4-Dioxane MUN 0.001 (Primary MCL) -- -- mg/L Under
Development
-- --
PFOA MUN 5.1 (NL)
10 (RL)

0.004 (HA)
-- -- ng/L Under
Development
(CA MCL)
4 (EPA MCL)
-- ng/L
PFOS MUN 6.5 (NL)
40 (RL)

0.02 (HA)
-- -- ng/L -- ng/L
PFBS MUN 500 (NL)
5000 (RL)
2000 (HA)
-- -- ng/L 1.0 (Hazard Index -

EPA MCL)
-- unitless
PFHxS 3 (NL)
20 (RL)
Gen X (HFPO-DA) 10 (HA)

PFNA --
Anatoxin-a MUN -- -- -- -- 4 (NL) -- µg/L
Saxitoxins MUN -- -- -- -- 0.6 (Interim NL) -- µg/L
Microcystins MUN -- -- -- -- 0.03 (Interim NL) -- µg/L
Cylindrospermopsin MUN -- -- -- -- 0.3 (Interim NL) -- µg/L Notes:
-- - none/not applicable; µg/L - micrograms per liter; DBCM - chlorodibromomethane; DCBM - bromodichloromethane; EPA - United States Environmental Protection Agency; HA - health advisory; HAA5 - haloacetic acids; HFPO-DA- hexafluoropropylene oxide dimer acid; MCL - maximum contaminant level; mg/L - milligrams per liter; MTBE - methyl tert-butyl ether; NDMA - N-Nitrosodimethylamine; ng/L - nanograms per liter; NL - notification level; PFBS - perfluorobutanesulfonic acid; PFHxS - perfluorohexane sulfonate; PFNA - perfluorononanoic acid; PFOA - perfluorooctanoic acid; PFOS - perfluorooctane sulfonate; PHG - Public Health Goal; RL - reporting limit; TTHM - total trihalomethane
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX O CITY OF SANTA MARIA RESIDENTIAL

ORGANIC RECYCLING PROGRAM

BROCHURE

WHAT IS EDIBLE FOOD
RECOVERY?
Edible food recovery is the act of rescuing
leftover edible food that would have otherwise
been disposed of to feed people in need. The
City of Santa Maria (City) Edible Food Recovery
Program connects local food-generating
businesses with local food recovery organizations
to distribute leftover edible food to people in
need. A list of the local organizations operating in
the City is available on our website:
https://bit.ly/FoodRecOrgSvcs.

To learn more about how to donate leftover edible food, visit our website: https://bit.ly/EdibleFoodRecovery.

WANT TO LEARN MORE ABOUT
ORGANIC WASTE RECYCLING?
Businesses in California are required to recycle
organic waste generated onsite instead of putting it in the trash. There
are three main
ways to recycle
organic waste.

One way is to
place organic
waste in the
curbside
organics
container
provided by the
City. This method
allows for all
organic waste,
including unlined
food-soiled paper, to be collected and recycled into
compost. However, plastic bags and compostable bags
cannot be put in the organics container. In 2023, the
City recycled over 1,450,000 pounds of organic waste
through the Commercial Organics Recycling Program.

Another option is to self-haul organic waste by
backhauling or contracting with a hauler authorized
Annual Organic Waste Prevention Newsletter
CITY OF SANTA MARIA Fall 2024
According to the United
States Department of
Agriculture, 30-40% of food
produced in the United States is
wasted. Using source reduction to
prevent organic waste (food waste)
from being disposed of in the
landfill is vital. Source reduction
is the method of reducing the
generation of excess edible
food by only purchasing what is
needed, eating more parts of the
food item, and safely storing food.

How do you determine what is wasted? Conduct
a waste audit to measure the types of foods
your business wastes and why. During the audit,
monitor your waste containers and record the
types of foods that you throw out, how much is
being discarded, and the reason the food is being
disposed of. The results can better inform your
purchasing practices.

Here are other methods your business can use to
reduce food waste:
• Reduce batch sizes.
• Train staff in knife skills to make more efficient
cuts and prevent waste.
• Freeze surplus fruits and vegetables near the
end of peak freshness for later use.
• Marinate meats to extend their shelf life.
• Use see-through storage containers to allow
staff to see what is available and keep an eye
on freshness.
• Provide samples to allow customers to taste
before they buy.
• Clarify “best by” and “sell by” date labeling to
reduce customer confusion.
• Take accurate inventories before ordering more
food and base orders on what you currently
have in stock.
• Incorporate leftovers in future meals.
to haul organic waste. The City requires all self-haulers to separate organic waste from other recyclables and trash prior to hauling it to a facility that can properly recycle organic waste, as per
Santa Maria Municipal Code 8-21.

Below is a list of haulers that are authorized to
haul organic waste:
• Atlas Performance Industries, Inc.
• B&B Construction Cleanup
• Bedford Enterprises
• Coastal Rolloff Services
• Engel & Gray Inc.
• Health Sanitation Service
• MarBorg Industries
• R&R Roll-off Service
Another way to recycle organic waste is by
composting or recycling it on-site. If you are
interested in recycling organic waste on-site, there
are several different methods. Visit the City’s
Commercial Organics Recycling page for more
information: https://bit.ly/CommOrganicsRecycling.

No matter how you recycle your organic waste,
you must separate all organic waste from other
recyclables and trash. For more information on
separation and disposal techniques, watch this video:
https://bit.ly/CSMCommOrganicsSepDispVideo.

HOW IS MY ORGANIC WASTE
RECYCLED?
After the City collects organic waste from your
organics container, it is taken to the local composting facility to be turned into compost. Compost is a
nutrient rich soil amendment used to increase the
health of soil and plants.

When organic waste is disposed of in the trash it
decomposes in the landfill, producing methane, a
harmful greenhouse gas. Methane emissions negatively
affect air quality, and also contribute to the overall
warming of the climate, causing more fires, more
extreme droughts, and rising sea levels. To learn more, visit this website: https://calrecycle.ca.gov/organics/ slcp/. Diverting organic waste from the landfill also
saves valuable landfill space, prolonging the life of the landfill.

Organic Waste
Prevention
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX P CITY OF SANTA MARIA 2018 ANNUAL EPA

SLUDGE REPORT
EPA Sludge Report for 2018
City of Santa Maria

ANNUAL EPA SEWAGE SLUDGE REPORT
2018
***** GENERAL INFORMATION *****

1. Name of Generator: City of Santa Maria Wastewater Treatment Plant

2. Location: 601 Black Rd., Santa Maria, CA 93458

3. Contact Person: Todd Suter

4. Telephone: 805-925-0951 ext. 7417 (FAX) 805-928-2600 Email: [email protected]

5. Sewage Flow (Average MGD in 2018): 7.40

6. Sludge collection and treatment process:

Sludge and scum are collected in typical wastewater treatment plant primary, intermediate, and secondary clarifiers. They are pumped continuously to two sludge thickening units similar to clarifiers but much smaller in diameter. The thickened sludge is pumped on the hour for about 10 min from each thickener into two or three anaerobic digesters depending on current operations. Methane gas produced by the digesters is used as a fuel to keep the digester contents at 35-37 degrees centigrade. Gas mixing also aids the digestion process. In addition to supernatant, at regular intervals sludge is withdrawn from the digesters to earthen and asphalt drying beds where it is de-watered to a moisture content of 15% to 30%. During the process described the volatile reduction of the sludge is approximately 50%.

YEAR 2018 SLUDGE SPECIFICS
Raw sludge pumped from the thickener to the digesters averaged 4.30% solids which were 84.1% volatile. In 2018, digester #2 was out of service for the entire year. Digester #4 was in service at the start of 2018 and was taken out of service in April when Digester #3 was brought online. Digester #1 contents averaged 2.1% solids, 68.9% volatile solids, with 58% volatile solids removed. It averaged 35.4 degrees centigrade with a minimum temperature of 30.3 degrees centigrade and a maximum of 37.9 degrees centigrade with an average sludge residency time of 21 days with a minimum of 17 days and a maximum of 25 days. Digester #3 contents averaged 2.4% solids, 63.9% volatile solids, with 55.9% volatile solids removed. It averaged 34.6 degrees centigrade with a minimum temperature of 32.0 degrees centigrade and a maximum of 37.5 degrees centigrade with an average sludge residency time of 18 days with a minimum of 16 days and a maximum of 24 days. Digester #4 contents averaged 2.0% solids, 70.2% volatile solids, with 58.7% volatile solids removed. It averaged 35.0 degrees centigrade with a minimum temperature of 33.7 degrees centigrade and a maximum of 35.0 degrees centigrade with a sludge residency time of 28 days with a minimum of 24 days and a maximum of 36 days. All sludge data is an average of weekly analyses. ***** SLUDGE DISPOSAL, ANALYSIS, CLASSIFICATION, & CERTIFICATION ****

1. In 2018 digested sludge was removed from the City of Santa Maria Wastewater Treatment Plant (“SMWWTP”) site. The City of Santa Maria Regional Landfill received 2014.15 “as-is” tons for use as final cover. This equates to approximately 1409.91 dry tons or 1279.04 dry metric tonnes. A commercial composting company (Engel & Gray, Inc., 745 W. Betteravia Rd., Santa Maria, CA 93455) on site at the SMWWTP received 2142.13 “as-is” tons of digested sludge. This equates to approximately 1499.49 dry tons or 1360.32 dry metric tonnes.

EPA Sludge Report for 2018

2. At the close of 2018, there was no digested sludge stockpiled on site at the wastewater treatment plant at 601 Black Rd.

3. Pollutant Analysis: Treatment plant sludge was tested for ten metal pollutants on a quarterly basis during 2018 per the requirements of Waste Discharge Requirement (“WDR”) R3-2010-0001.

4. Results are from composited samples of individual sludge beds.

ANALYSIS OF POLLUTANTS
(Results are in mg/kg on a dry weight basis.)

City of Santa Maria Wastewater Treatment Plant Biosolids Removal Annual Monitoring Summary 2018 MASS SAMPLE Engel and Gray Composing Santa Maria Regional Landfill (tons) TYPE (wet tons*) (dry tons) (dry tonnes) (wet tons*) (dry tons) (dry tonnes) Jan 1702.22 Quanity Removed Measured Tons 728.99 510.29 462.93 0.00 0.00 0.00 Feb 315.65 Quanity Removed Measured Tons 135.18 94.63 85.84 0.00 0.00 0.00 Mar 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Apr 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 May 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Jun 2322.48 Quanity Removed Measured Tons 757.43 530.20 480.99 553.86 387.70 351.72 Jul 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Aug 2210.69 Quanity Removed Measured Tons 382.71 267.90 243.03 1317.05 921.94 836.37 Sep 465.05 Quanity Removed Measured Tons 137.82 96.47 87.52 143.24 100.27 90.96 Oct 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Nov 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 Dec 0.00 Quanity Removed Measured Tons 0.00 0.00 0.00 0.00 0.00 0.00 TOTAL Tons: 7016.09 Itomized Tons: 2142.13 1499.49 1360.32 2014.15 1409.91 1279.04 * Wet tons is estimated to posses a 30% moisture content by weight

MONTH PARAMETER UNITS
WWTP Biosolid Analytical Analysis : 2018
Pollutant Unit Sample Type JAN APR JUL OCT
Arsenic (mg/kg) Grab <4.9 4.8 4.7 6.4
Cadmium (mg/kg) Grab 3.3 2.1 1.4 <0.35
Chromium (mg/kg) Grab 55 48 33 39
Copper (mg/kg) Grab 560 360 430 450
Lead (mg/kg) Grab 21 14 15 16
Mercury (mg/kg) Grab 0.96 1.3 1.6 1.1
Molybdenum (mg/kg) Grab 21 16 17 23
Nickel (mg/kg) Grab 35 29 22 27
Selenium (mg/kg) Grab <4.9 <1.6 7.8 11
Zinc (mg/kg) Grab 1,800 1,200 1,400 1,500
* Pathogens: As per 503.32 (b)(3) Class B – Alternative 2, Processes to Significantly Reduce Pathogens, appendix B, number 3, anaerobic digestion with "mean cell residence and temperature between 15 days at 35 to 55 degrees Celsius and 60 days at 20 degrees Celsius". * Vector Attraction Reduction: As per 503.33 (b)(1), i.e. greater than 38% volatile reduction * This table summarizes all sludge data mandated by State and Federal authorities.

Values reported in mg/kg are on a dry weight basis.

EPA Sludge Report for 2018

5. Certification Statement: I certify, under penalty of law, that the pathogen requirements in 503.32 (b)(3) and the vector attraction reduction requirements in 503.33 (b)(1) have been met. This determination has been made under my direction and supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information used to determine that the pathogen requirements and vector reduction requirements have been met. I am aware that there are significant penalties for false certification including the possibility of fine and imprisonment.

______________________________
SHAD S. SPRINGER, P.E., MPA
Director of Utilities
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX Q STATEWIDE GENERAL COMPOSTING
PERMIT (ORDER WQ201-0121-DWQ)

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS

FOR COMPOSTING OPERATIONS
AUGUST 4, 2015

THIS PAGE INTENTIONALLY LEFT BLANK

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS

FOR COMPOSTING OPERATIONS
Table of Contents
ACRONYMS AND ABBREVIATIONS .........................................................................................ii BACKGROUND INFORMATION................................................................................................ 1 SCOPE OF THIS GENERAL ORDER........................................................................................ 5 APPLICATION PROCESS......................................................................................................... 8 ANTIDEGRADATION ANALYSIS .............................................................................................. 9 TITLE 27 APPLICABILITY ........................................................................................................11 CALIFORNIA ENVIRONMENTAL QUALITY ACT.....................................................................12 OTHER REGULATORY CONSIDERATIONS ...........................................................................15 IT IS HEREBY ORDERED........................................................................................................16 PROHIBITIONS.....................................................................................................................16 SPECIFICATIONS.................................................................................................................18 DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – ALL TIERS.................19 DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – TIER II ONLY.............20 MONITORING REQUIREMENTS..........................................................................................21 MAINTENANCE REQUIREMENTS.......................................................................................22 SITE CLOSURE REQUIREMENTS.......................................................................................22 REPORT REQUIREMENTS..................................................................................................22 NOTIFICATION REQUIREMENTS........................................................................................24 ADDITIONAL REQUIREMENTS ...........................................................................................25 CERTIFICATION ......................................................................................................................28 ATTACHMENT A - DEFINITIONS...........................................................................................A-1 ATTACHMENT B – MONITORING AND REPORTING PROGRAM........................................B-1 ATTACHMENT C – NOTICE OF INTENT ...............................................................................C-1 ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS...............................................D-1 i
August 4, 2015

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS

FOR COMPOSTING OPERATIONS

ACRONYMS AND ABBREVIATIONS
Antidegradation Policy State Water Board Resolution 68-16, Statement of Policy with Respect to Maintaining High Quality of Waters of California Basin Plan Water Quality Control Plan
BMP Best Management Practices
BPTC Best Practicable Treatment or Control
CalOES California Governor’s Office of Emergency Services CalRecycle California Department of Resources Recycling and Recovery CEQA California Environmental Quality Act
cm/s Centimeters per second
CPLX Complexity of the Discharge Rating
cy Cubic Yards
EDF Electronic Deliverable Format
EIR Environmental Impact Report
EQ Exceptional Quality
FEMA Federal Emergency Management Agency
FDS Fixed Dissolved Solids
Industrial General Permit Waste Discharge Requirements for Discharge of Storm Water Associated with Industrial Activities Excluding Construction Activities
LEA Local Enforcement Agency
MDL Method Detection Limit
mg/L Milligrams per Liter
mg/kg Milligrams per kilogram
µmhos/cm Micromhos per centimeter
MPI Minutes per Inch
MRP Monitoring and Reporting Program
NOA Notice of Applicability
NOI Notice of Intent to Comply with the Terms of General Waste Discharge Requirements for Composting Operations
NPDES National Pollutant Discharge Elimination System
ii
August 4, 2015

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS

FOR COMPOSTING OPERATIONS
PDF Portable Document Format
POTW Publicly Owned Treatment Works
PQL Practical Quantitation Limit
QA/QC Quality Assurance/Quality Control
Regional Water Board Regional Water Quality Control Board State Water Board State Water Resources Control Board
TDS Total Dissolved Solids
TTWQ Threat to Water Quality Rating
U.S. EPA United States Environmental Protection Agency
WDRs Waste Discharge Requirements
iii
August 4, 2015

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

BACKGROUND INFORMATION
FINDINGS:

The State Water Resources Control Board (State Water Board) finds that:

1. The State of California currently disposes an estimated 35 million tons of waste annually in landfills, of which 32 percent is compostable organic material, 29 percent is construction debris, and 17 percent is paper.

2. Composting is the biological decomposition of organic materials by microorganisms under controlled aerobic conditions to create a product (e.g., soil amendment or soil blend).

Compostable materials comprise a wide range of material types: grass, leaves, branches, prunings, stumps, wood waste, agricultural materials, manure, food, and biosolids.

3. Composting organic material yields environmental benefits by recycling nutrients and diverting materials from landfills. Diversion of compostable materials from landfills reduces the amount of material landfilled and extends landfill capacity and service life.

4. Compost can be a valuable soil amendment that improves soil tilth and plant health, increases soil water holding capacity, reduces runoff, adds beneficial micro-organisms, adds organic matter, and sequesters carbon.

5. Composting activities typically occur on open and uncovered land, exposed to precipitation. However, some composting activities are performed within structures, protected from precipitation.

6. Compostable materials may contain nutrients, metals, salts, pathogens, and oxygen-reducing compounds that can degrade water quality if allowed to migrate into groundwater or surface water. The process of composting can allow contaminants to migrate with leachate or wastewater from these materials. Additionally, composting nutrient-rich feedstocks on more permeable soil has the potential to create elevated nitrate concentrations in groundwater.

7. Composting facilities may contain areas where composting operations occur as well as ancillary buildings (e.g., office space, equipment storage, etc.). For the purposes of these General Waste Discharge Requirements for Composting Operations (General Order), the term “Composting Operation” shall mean the area at which operations are conducted, including the receiving area, pre-processing, processing, curing, storage areas, detention ponds, and other areas associated with production of compost, including storage areas for feedstocks, additives, or amendments. Attachment A, attached hereto and made part of this order, provides definitions of terms and phrases used in this General Order.

8. For the purposes of this General Order, all references to compost include compost piles actively being composted, cured, and stored on site to mature prior to sale or use (final product).

9. Water Code section 13260, subdivision (a) requires that any person discharging waste or proposing to discharge waste, other than to a community sewer system, that could affect August 4, 2015
1 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS the quality of the waters of the state, shall file a report of waste discharge. Water Code section 13263 provides that a Regional Water Quality Control Board (Regional Water Board) or the State Water Board shall prescribe waste discharge requirements (WDRs) that implement the Regional Water Boards’ water quality control plans (Basin Plans) and take into consideration the beneficial uses to be protected and the water quality objectives reasonably required for that purpose and the need to prevent nuisance. “Waste” is defined in Water Code section 13050, subdivision (d).

10. Assembly Bill No. 341 enacted in 2011 (2011–2012 Reg. Sess.; Stats. 2011, ch. 476) established a policy goal that not less than 75 percent of the solid waste generated in the state be source-reduced, recycled, or composted by 2020. The California Department of Resources Recycling and Recovery (CalRecycle) developed a plan to increase the diversion of compostable materials.

11. CalRecycle has adopted regulations governing compostable material handling facilities. (Cal. Code Regs., tit. 14, div. 7, ch. 3.1.) The regulations address composting operations including facility siting, design standards, operating standards, environmental health standards, such as sampling and pathogen reduction requirements for the compost products derived from compostable materials prior to being sold or given away, recordkeeping, monitoring, reporting, and site restoration. CalRecycle’s authority does not include regulating water quality. The State Water Board and each Regional Water Board have primary responsibility for coordination and control of water quality (Wat. Code, § 13001).

12. Historic regulation of composting operations by the Regional Water Boards has included individual WDRs or conditional waivers of WDRs. This General Order provides a streamlined method to allow the Regional Water Boards to permit composting operations and address potential impacts to water quality.

13. Dischargers covered by individual WDRs or a conditional waiver of WDRs may continue discharging under that authority until those orders expire or come up for renewal. At that time, or earlier at the discretion of the Regional Water Boards, it is the intent of the State Water Board that Regional Water Boards will enroll all eligible composting operations under this General Order. If a Regional Water Board determines that, due to site-specific conditions, coverage under this General Order will not be protective of water quality, the Regional Water Board may issue individual WDRs for a composting operation. If a composting operation is co-located at a landfill or other facility that has individual or general WDRs, the composting operation does not need to be covered under this General Order if the landfill or other facility’s WDRs include requirements for the composting operation as determined by the Regional Water Board.

14. Water Code section 13263, subdivision (i) states that the State Water Board or a Regional Water Board may prescribe general WDRs for a category of discharges if the State Water Board or Regional Water Board finds or determines that all of the following criteria apply to the discharges in that category:
a. The discharges are produced by the same or similar operations; b. The discharges involve the same or similar types of waste; August 4, 2015
2 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. The discharges require the same or similar treatment standards; and d. The discharges are more appropriately regulated under general WDRs than individual WDRs.

Composting operations that will be regulated under this General Order are consistent with the criteria listed above, and therefore a general order is appropriate. All discharges regulated under this order will be from similar operations and will be consistent with the description of composting operations as defined in this General Order. The discharges will use similar containment methods (e.g. pads and ponds). Individual WDRs are not necessary because the discharges are similar and discharge requirements would be similar if individual WDRs were issued.

15. This General Order does not preempt or supersede the authority of federal, state, or local governmental agencies to prohibit, restrict, or control discharges of waste subject to their jurisdiction.

16. A composting operation typically consists of a receiving and storage area for feedstocks, additives and amendments; a pre-processing area where materials are prepared for composting (screening, size adjustment, etc.); an active composting area; a curing area where the material matures before sale (moisture content and temperature is reduced); and a final screening and storage area where the final compost product is prepared for sale. Additives and amendments are often added to compost to adjust moisture content, product bulk, or pH.

17. Composting can be done on a small or large scale. This General Order only addresses composting operations that receive, process, and store at least 500 cubic yards (cy) of materials at any given time.

18. Composting typically results in release of water from the feedstock material as biological decomposition occurs. The released water becomes leachate and if sufficient in volume will drain from the compost pile. Precipitation that falls on, or water that is applied to the compost piles may also result in liquid draining from the compost piles. The liquids may contain nutrients, metals, salts, pathogens, and/or oxygen reducing compounds.

19. Water is evaporated from the compost piles, in part due to the heat generated in biological decomposition. Water is added to maintain appropriate moisture content. The water may include wastewater collected in the detention pond, or water from another water supply source.

20. Composting operations have the potential to degrade water quality with nutrients (e.g., nitrate), salinity (e.g., sodium chloride), pathogens, oxygen-reducing materials, sediment, and other waste constituents. Implementation of best practicable treatment or control (BPTC) can prevent or limit the degradation.

21. Composting operation setbacks from water supply wells and surface water bodies are provided in this General Order. Setbacks are included as a means of reducing pathogenic risks by coupling pathogen inactivation rates with groundwater travel time to a well or other potential exposure route (e.g. water contact activities). In general, a substantial unsaturated zone reduces pathogen survival compared to saturated soil conditions. Fine August 4, 2015
3 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS grained (silt or clay) soil particles reduce the rate of groundwater transport and therefore are generally less likely to transport pathogens; coarse grained soil particles or fracture flow groundwater conditions may be more likely to transport pathogens. Setbacks also provide attenuation of other wastewater constituents through physical, chemical, and biological processes.

22. Strategies to control infiltration of wastewater into groundwater include reducing the permeability of areas where compostable materials are stored or composted, constructing sloped pads to facilitate drainage to a detention pond or tank, and reducing the permeability of detention ponds.

23. Wastewater refers to leachate or any other liquid flowing from, or on the working surface.

That wastewater from the working surface may be conveyed to a detention pond.

Wastewater may be reapplied to the compost piles as needed.

24. Total dissolved solids (TDS) consists of both volatile (organic) and fixed (inorganic) fractions. Varying concentrations of volatile dissolved solids will exist in wastewater that is collected in the detention pond. Volatile dissolved solids in the wastewater reapplied to compost piles may be reduced to negligible concentrations by filtration and biological degradation. However, fixed dissolved solids (FDS) do not degrade biologically.

25. The 40 Code of Federal Regulations part 503 biosolids regulations establish ceiling concentration limits for metals; pollutant concentration limits; Class A pathogen requirements; Class B pathogen requirements; site restrictions; and vector attraction reduction requirements.

26. This General Order requires biosolids that are used as a feedstock at the composting facility to comply, at a minimum, with the ceiling concentrations listed in Table 1 of 40 Code of Federal Regulations part 503.13 listed in Table 1 below, and Class B pathogen requirements. The United States Environmental Protection Agency (U.S. EPA) regularly reviews, and may revise, the limitations and requirements of 40 Code of Federal Regulations, part 503. Consult 40 Code of Federal Regulations part 503 for updates.

Table 1. Biosolids Feedstock Ceiling Concentrations
Constituent Units Ceiling Concentration
Arsenic mg/kg 75
Cadmium mg/kg 85
Copper mg/kg 4,300
Lead mg/kg 840
Mercury mg/kg 57
Molybdenum mg/kg 75
Nickel mg/kg 420
Selenium mg/kg 100
Zinc mg/kg 7,500
August 4, 2015
4 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

SCOPE OF THIS GENERAL ORDER

27. The amount and type of feedstocks composted, as well as site conditions such as depth to groundwater, percolation rate, and proximity to surface water and wells inherently affects the threat to water quality. This General Order employs a tiered approach to regulating composting operations.

28. Only composting operations that comply with the allowable feedstock and setback requirements are eligible for coverage under this General Order. a. Tier I and Tier II allowable feedstocks (as defined in Attachment A) are limited to the materials listed in Table 2 below:

Table 2. Allowable Feedstocks
Tier I Feedstocks Tier II Feedstocks
Agricultural materials Food materials (non-vegetative)
Green materials Biosolids (Class A, B, and/or Exceptional Quality (EQ)): as defined in Attachment A
Paper materials Manure
Vegetative food materials Anaerobic digestate derived from allowable Tier II feedstocks
Anaerobic digestate derived from allowable
Tier I feedstocks
A combination of allowable Tier I and Tier
II feedstocks
Residentially co-collected or self-hauled
food and green materials
b. Composting operations shall be setback at least 100 feet from the nearest surface water body and/or the nearest water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality.

29. Composting operations (Tier I or Tier II) are classified based on the types of feedstocks; total volume of materials received, processed, and stored at any given time; and hydrogeologic siting considerations. The tiers are defined as follows:
a. Tier I includes a composting operation that meets all of the following conditions:
1) The feedstocks are limited to Tier I feedstocks listed in Table 2 and defined in Attachment A;
2) The facility receives, processes, and stores less than 25,000 cy of a combination of allowable Tier I feedstocks, compost, (active, curing, and final product) additives and amendments on site at any given time; and 3) The percolation rate and depth to the highest anticipated groundwater level underlying the composting operation is consistent with Table 3 below:

August 4, 2015
5 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Table 3. Tier I Percolation Rate and Depth to Groundwater Standards Soil Percolation Rate
(MPI – minutes per inch)
Depth to Groundwater
(minimum)
< 1 MPI 50 feet
1 MPI – 5 MPI 20 feet
> 5 MPI – 30 MPI 8 feet
> 30 MPI 5 feet
b. Tier II includes a composting operation that meets one or more of the following conditions:
1) The feedstocks include any of the Tier II feedstocks listed in Table 2, and defined in Attachment A;
2) The facility receives, processes and stores 25,000 cy or more of a combination of allowable Tier I or Tier II feedstocks, compost, additives and amendments on site at any given time; and/or
3) The site-specific hydrogeologic conditions do not meet the Tier I percolation rate and depth to groundwater standards listed in Table 3.

30. The following composting-related activities are unlikely to degrade water quality and are therefore exempt from this General Order. However, the Regional Water Board may determine individual WDRs are appropriate under site-specific conditions. Composting operations may be subject to other federal, state, or local regulations. a. Agricultural composting;
b. Chipping and grinding facilities and operations. This includes chipping and grinding facilities and operations at a composting facility if located outside of the composting operation area;
c. Lot clearing by local government agencies (e.g., grubbing, tree trimming, etc.) for fire protection;
d. Composting activities that are within a fully enclosed vessel; e. Composting operations that receive, process, and store less than 500 cy of allowable materials at any given time; and
f. Composting operations that receive, process and store less than 5,000 cy per year of allowable Tier I and Tier II feedstocks, additives and amendments that implement the following management practices:
1) Completely cover materials during storm events as needed to reduce the generation of wastewater; and
2) Manage the application of water to reduce the generation of wastewater.

August 4, 2015
6 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

31. Discharges of the following wastes may pose a significant threat to water quality, and are therefore prohibited from being discharged under this General Order. The discharge of these wastes may be more appropriately regulated by individual WDRs or other orders issued by the Regional Water Board.
a. Animal carcasses;
b. Liquid wastes other than those of food origin;
c. Medical wastes as defined in Health and Safety Code section 117690; d. Radioactive wastes;
e. Septage;
f. Sludge, including but not limited to sewage sludge, water treatment sludge, and industrial sludge;
g. Wastes classified as “designated”, as defined in Water Code section 13173; h. Wastes classified as “hazardous” as defined in California Code of Regulations, title 22, section 66261.3;
i. Wood containing lead-based paint or wood preservatives, or ash from such wood; or j. Any feedstock, additive, or amendment other than those specifically described in this General Order, unless approved by the Regional Water Board as described in the Specifications.

32. The use of additives and amendments, as defined and limited by this General Order, is not expected to pose a significant threat to water quality as long as the Discharger maintains compliance with the requirements and prohibitions of this General Order. A Regional Water Board may limit or prohibit the use of an additive or amendment if the use of the additive or amendment could result in pollution or nuisance.

33. Compliance with design specifications and associated performance requirements included in this General Order is determined to be protective of water quality.

34. The requirements in this General Order do not apply to the application or use of the final compost product.

35. Technical and monitoring reports specified in this General Order are required. Failing to furnish the reports by the due date or falsifying information in the reports, are misdemeanors that may result in assessment of civil liabilities against the Discharger.

Water Code section 13267 states, in part:
“In conducting an investigation specified in subdivision (a), the regional board may require that any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region, or any citizen or domiciliary, or political agency or entity of this state who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of waters August 4, 2015
7 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS within its region shall furnish, under penalty of perjury, technical or monitoring program reports which the regional board requires. The burden, including costs, of these reports shall bear a reasonable relationship to the need for the report and the benefits to be obtained from the reports. In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports, and shall identify the evidence that supports requiring that person to provide the reports.” The technical reports required by this General Order and the Monitoring and Reporting Program (MRP) in Attachment B are necessary to assure compliance with this General Order.

36. In accordance with Water Code section 13000 et seq., this General Order implements regulations and policies adopted by the State Water Board, including the agency’s regulations under California Code of Regulations, title 23, and implements applicable provisions of the Health and Safety Code.

APPLICATION PROCESS

37. Existing composting operations, except those with individual WDRs, general WDRs, or conditional waivers of WDRs that address the composting operation as determined by the Regional Water Board, are required to seek coverage under this General Order by submitting a complete Notice of Intent (NOI) (Attachment C), including the appropriate filing fee (Cal. Code Regs., tit. 23, § 2200), and a technical report including, but not limited to, information requested in Attachment D to the Regional Water Board. The NOI, filing fee and technical report must be submitted within one year of adoption of the General Order. The technical report shall include a proposed schedule for full compliance and must be as short as practicable but may not exceed 6 years from the date of the NOI.

38. New composting operations that propose to begin operating after adoption of this General Order, are required to seek coverage by submitting a complete NOI (Attachment C), including the appropriate filing fee (Cal. Code Regs., tit. 23, § 2200) and a technical report including, but not limited to, information requested in Attachment D, to the Regional Water Board not less than 90 days prior to commencement of the composting operation.

39. For the purposes of this General Order, an NOI and accompanying technical report (as described in Attachments C and D, respectively) is equivalent to a Report of Waste Discharge. After the Regional Water Board determines that the NOI and accompanying technical report are complete, the initial fee has been received, and the composting operation can be appropriately regulated under this General Order, a Notice of Applicability (NOA) will be issued by the Regional Water Board. Within the NOA, the Regional Water Board will at a minimum, confirm a Discharger's tier, timeline for compliance, and method of monitoring to comply with applicable monitoring requirements.

40. Upon issuance of an NOA for coverage under this General Order, the Discharger’s NOI and technical report will become incorporated by reference into this General Order. The August 4, 2015
8 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Discharger is responsible for implementing all operations in a manner that complies with this General Order.

41. The Discharger is required to pay an annual fee (e.g., waste discharge permit fee) (Wat.

Code, § 13260 et seq.). The filing fee accompanying the NOI is the first year's annual fee.

The annual fee is based on the threat to water quality (TTWQ) and complexity (CPLX) rating of the discharge (Cal. Code Regs., tit. 23, § 2200.). The ratings are available at:
http://www.waterboards.ca.gov/resources/fees/.

ANTIDEGRADATION ANALYSIS

42. State Water Board Resolution No. 68-16, Statement of Policy with Respect to Maintaining High Quality of Waters of California (hereafter the Antidegradation Policy) requires that disposal of waste into the waters of the state be regulated to achieve the highest water quality consistent with maximum benefit to the people of the state. The quality of some waters of the state is higher than that established by adopted policies, and that higher quality water shall be maintained to the maximum extent possible consistent with the Antidegradation Policy. The Antidegradation Policy requires the following:
a. Maintenance of existing high quality waters of the state unless limited degradation is consistent with maximum benefit to the people of the state, will not unreasonably affect present and anticipated beneficial use of the water, and will not result in water quality less than that prescribed in state policies.
b. Any activity that produces or may produce a waste and discharges or proposes to discharge to existing high quality waters will be required to meet WDRs that will result in BPTC of the discharge necessary to assure pollution or nuisance will not occur, and the highest water quality consistent with maximum benefit to the people of the state will be maintained.

43. When issuing NOAs under this General Order, the Regional Water Board must assure that Dischargers implement BPTC as necessary to maintain the highest water quality consistent with maximum benefit to the people of the state.

44. This General Order may allow limited discharges to groundwater. There are not sufficient data to determine which receiving waters are high quality waters. To the extent a discharge covered under this General Order may be to high quality waters, this General Order authorizes limited degradation consistent with the Antidegradation Policy as described in the findings below.

45. Limited degradation of groundwater by some waste constituents associated with composting operations, after effective source control, treatment, and control measures are implemented, is consistent with the maximum benefit to the people of the state. The economic prosperity of communities and associated industry, and the diversion of wastes from landfills and associated conservation of landfill space are of maximum benefit to the people of the state and provide sufficient justification for allowing limited groundwater degradation that may occur pursuant to this General Order provided the terms of the August 4, 2015
9 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS applicable Basin Plan and other applicable State Water Board and Regional Water Board policies are consistently met.

46. This General Order places restrictions on the discharge of waste from composting operations. The terms and conditions of this General Order are designed to minimize groundwater quality degradation and protect beneficial uses of waters of the state.

Implementation of water and wastewater management plans, groundwater protection plans, and construction of waste containment features at composting operations will minimize groundwater quality degradation.

47. The General Order establishes limits on the volume, types, and quality of the feedstocks, additives and amendments used at the facility. Some waste types are explicitly prohibited from use due to their threat to water quality. All feedstocks, additives and amendments must be contained in areas to control wastewater. In addition, hydrogeologic site conditions are considered when classifying a compost facility as Tier I or Tier II. a. Facilities that receive, process, and store less than 25,000 cy of allowable Tier I feedstocks, compost, additives and amendments on site at any given time are inherently less likely to degrade water quality because the amount and types of waste constituents present at the facility is lower than at Tier II facilities. The limits apply both to the feedstocks and the types and amounts of additives and amendments. Tier I facilities must also comply with the hydrogeologic site conditions (depth to groundwater and percolation rate) specified in the General Order. b. Tier II facilities impose additional BPTC measures such as limits on feedstock quality; and hydraulic conductivity requirements for working surfaces, detention ponds, and drainage ditches. Biosolids used as a feedstock must comply with the ceiling concentrations contained in Code of Federal Regulations, section 503.13 (Table 1), at a minimum. In addition, detention ponds must be constructed with a pan lysimeter to allow early detection of pond liner leakage.

48. To mitigate potential impacts to water quality, siting restrictions specified in this General Order prohibit composting operations within 100 feet of the nearest surface water body or water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality. In addition, feedstocks used (Table 2), volume of materials (received, processed and stored) on site at any given time, soil percolation rate, and depth to groundwater standards (Table 3) of this General Order are used to classify composting operations into two tiers. Composting operations not meeting minimum standards for percolation rate and depth to groundwater are classified into the more protective Tier II category.

49. This General Order establishes requirements and standards for BPTC measures to limit or prevent degradation. Identified BPTC measures include:
a. Minimize Infiltration of Waste Constituents on Working Surfaces - The most effective way to reduce or eliminate water quality impacts is to restrict infiltration of wastes on working surfaces (including receiving, processing, and storage areas). The General August 4, 2015
10 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Order requires working surfaces to be designed and constructed to be sloped to prevent ponding, and convey wastewater to an approved wastewater management system. Tier II facilities must also comply with a hydraulic conductivity standard to limit infiltration of liquids to the subsurface at working surfaces, drainage ditches and detention ponds.
b. Design and Operate Detention Ponds to Contain and Reuse Wastewater - All detention ponds must comply with design, construction, and maintenance requirements in this General Order. The General Order includes requirements that ponds must be designed and certified by a registered professional engineer to have adequate capacity and structural integrity to hold wastewater and precipitation. All ponds must be managed to prevent breeding of mosquitos and generation of odors.

Detention ponds constructed at Tier II facilities must also comply with a hydraulic conductivity standard to limit infiltration of liquids to the subsurface. c. Perform Monitoring to Ensure BPTC Measures are Effective - To detect potential threats to water quality, detention ponds constructed at Tier II facilities must be constructed with a pan lysimeter monitoring device under the lowest point of the pond or equivalent engineered alternative approved by the Regional Water Board.

The engineered alternative must provide equivalent assurance of the earliest possible detection of a release from the pond.

50. The State Water Board recognizes that composting operations play an important role in meeting California's recycling goals to divert more wastes from landfills into reusable products. In addition, composting is a strategy for reducing greenhouse gas emissions throughout the state. Benefits of using compost include increasing soil water holding capacity, adding beneficial micro-organisms to improve soil health, improving soil tilth, and carbon sequestration. Considering these benefits, the State Water Board finds that composting in compliance with this General Order is consistent with the maximum benefit to the people of the state.

TITLE 27 APPLICABILITY

51. California Code of Regulations, title 27, sections 20200 through 20230 establish a waste classification system. Wastes covered under California Code of Regulations, title 27 are classified as either inert, nonhazardous solid, or designated. Inert wastes pose minimal risk to water quality, nonhazardous solid wastes present a greater risk than inert wastes, and designated wastes pose the greatest risk to water quality. Allowable compostable materials per this General Order meet the definition of nonhazardous solid waste under California Code of Regulations, title 27, section 20220, subdivision (a).

52. California Code of Regulations, title 27, section 20200, subdivision (a)(1) allows a finding to be made that, "…a particular waste constituent or combination of constituents presents a lower risk of water quality degradation than indicated by classification according to this article." Therefore, to the extent that a particular compostable material could be characterized as designated waste, such material shall be regulated as a nonhazardous August 4, 2015
11 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS solid waste pursuant to California Code of Regulations, title 27, section 20200, subdivision (a)(1) because the compostable material presents a lower risk to water quality than typical designated wastes when managed as required by this General Order.

53. The California Code of Regulations, title 27 regulations that apply to nonhazardous solid waste only apply to such waste that is disposed of in a landfill. Diverting compostable organic materials from landfills is one of the goals of this General Order. Therefore, compost operations eligible for coverage under this General Order, California Code of Regulations, title 27 regulations shall not apply so long as the Discharger continues to meet the requirements of this General Order.

CALIFORNIA ENVIRONMENTAL QUALITY ACT

54. On August 7, 2015, in accordance with the California Environmental Quality Act (CEQA) (Pub. Resources Code, § 21000 et seq.), the State Water Board certified Environmental Impact Report (EIR) No. 2015012021 for this General Order. Several significant impacts related to water quality were identified in the EIR. The General Order contains mitigation measures designed to reduce the impact when possible. A summary of the water quality related significant impacts and the mitigation measures is presented below:

EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 6.5 Composting operations
have the potential to
create objectionable
odors affecting a
substantial number of
people.

The General Order requires control of objectionable
odors. Mitigation measures are contained in the
Specifications and Design Construction and
Operation Requirements – all tiers.

Impact 9.2 Composting operations
have the potential to
result in substantial soil
erosion or loss of topsoil.

The General Order requires control of wastewater
generated by the compost process. Mitigation
measures are contained in the Design Construction
and Operation Requirements – all tiers.

August 4, 2015
12 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 11.1 Composting operations
have the potential to
result in violations of
water quality standards
or waste discharge
requirements.

The General Order requires surface and
groundwater quality to be maintained to protect
beneficial uses. The following mitigation measures
related to water quality standards are included in the
General Order:
 For mitigation related to surface water
objectives, see mitigation measures in response
to Impact 9.2 (listed above).
 For mitigation related to groundwater objectives
mitigation measures are contained in
Prohibitions, Specifications, Design Construction
and Operation Requirements – all tiers, and tier
II, and maintenance requirements. The General
Order limits the types of feedstocks used, and
requires certain containment requirements to
minimize infiltration.

Impact 11.3 Composting operations
have the potential to
substantially alter
existing drainage
resulting in substantial
erosion or siltation on- or
off-site.

Composting operations will be designed to contain
wastewater on-site. See the mitigation measures
described for Impact 9.2 and 11.1.

Requirements of the General Order to contain
wastewater on-site include the following:
 Design, construct, and maintain areas used for
receiving, processing, or storing feedstocks,
additives, amendments, or compost to control
and manage run-on and run-off from a 25-year,
24-hour peak storm event;
 Protect areas used for receiving, processing, or
storing feedstocks, additives, amendments, or
compost from surface flows associated with a
25-year, 24-hour peak storm event from
inundation by surface flow;
 Design and operate the detention pond,
containment berm, and drainage conveyance
systems to contain a 25-year,
24-hour peak storm event;
Require low permeability drainage ditches for Tier II
operations.

August 4, 2015
13 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 11.4 Composting operations
may have the potential to
substantially alter the
existing drainage pattern
of the site or area,
including through the
alteration of the course of
a stream or river, or
substantially increase the
rate or amount of surface
runoff in a manner which
would result in flooding
on- or off-site.

The General Order requires management of
drainage and wastewater run-off. See Mitigation
Measures 9.2, 11.1, and 11.3.

Impact 11.5 Composting operations
may create or contribute
runoff water which could
exceed the capacity of
existing or planned storm
water drainage systems
or provide substantial
additional sources of
polluted runoff.

Composting operations will be designed to contain
wastewater on-site. See the mitigation measures
described for Impact 9.2.

Impact 11.6 Composting operations
may have the potential to
substantially degrade
water quality.

Composting operations will be designed to contain
wastewater on-site and prevent wastewater from
changing groundwater quality to the extent beneficial
uses are impacted. See the responses to Impacts

9.2 and 11.1.

Impact 15.2 Composting operations
have the potential to
exceed wastewater
treatment requirements
of the applicable
Regional Water Board.

The General Order requires containment of
wastewater that is generated. Active treatment
systems at composting facilities are possible (most
likely a mechanical aerator in a detention pond). If
off-site disposal of wastewater is necessary, delivery
to a treatment system is possible via a collection
system or tank truck hauling. See the responses to
Impacts 9.2 and 11.1.

August 4, 2015
14 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS EIR Impact
No. Impact Summary General Order Mitigation Measures
Impact 15.6 Composting operations
have the potential to
result in a determination
by the wastewater
treatment provider that it
does not have adequate
capacity to serve the
project’s projected
demand in addition to the
provider’s existing
commitments.

The General Order requires containment of
wastewater that is generated; therefore a discharge
at a wastewater treatment facility is unlikely. See
the responses to Impacts 9.2 and 11.1.

55. The State Water Board has notified composting operators and owners, and governmental agencies and interested persons of its intent to certify an EIR and adopt a General Order and provided them the opportunity to attend a public meeting and submit their written views and recommendations.

56. The State Water Board, in a public meeting, heard and considered all comments pertaining to this matter.

OTHER REGULATORY CONSIDERATIONS

57. All WDRs must implement the applicable Regional Water Board’s Basin Plan for the region in which the discharge occurs; therefore this General Order requires dischargers to comply with all applicable Basin Plan requirements and water quality objectives governing the discharge. In the event of a conflict between the requirements of this General Order and the Basin Plan, the more stringent requirement prevails.

58. The Discharger, as a condition of this General Order, may be required to conduct regular maintenance and monitoring to demonstrate protection of water quality and beneficial uses. Dischargers are financially responsible for costs associated with these activities as long as the operation is covered under this General Order.

59. This General Order is not a National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to the Federal Clean Water Act. For composting operations where storm water discharges off-site, the Discharger may be required to enroll under the State Water Board’s General Order No. 97-03-DWQ (new Industrial General Permit 2014-0057- DWQ will be effective July 1, 2015), NPDES General Permit No. CAS000001, Waste Discharge Requirements for Discharges of Storm Water Associated with Industrial Activities Excluding Construction Activities (Industrial General Permit), and/or future promulgations. If wastewater is discharged to surface water, the Discharger may be required to obtain an individual NPDES permit. Coverage under this General Order does August 4, 2015
15 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS not exempt a facility from the federal Clean Water Act. Any facility required to obtain such permits must notify the Regional Water Board.

60. The issuance of this General Order is consistent with the goal to provide water resources protection, while considering economic and environmental impacts as stated in the Strategic Plan of the Water Boards and section 13263, subdivision (a) of the Water Code.

Economic considerations are discussed in Appendix D of the EIR.

61. This General Order does not supersede the authority of local governmental agencies to prohibit, restrict, or control the use of biosolids subject to their control, as allowed under current law. It is the responsibility of the Discharger to obtain any local governmental agency permits or authorizations prior to the composting or use of biosolids at each site.

62. This General Order does not supersede any federal, state, or local law or regulation.

63. Pursuant to Water Code section 13263, subdivision (g), the discharge of waste into waters of the state is a privilege, not a right, and adoption of this General Order does not create a vested right to discharge wastes into the waters of the state. Failure to prevent conditions that create or threaten to create pollution or nuisance or that may unreasonably degrade waters of the state will be sufficient reason to modify, revoke, or enforce this General Order.

64. Pursuant to Water Code section 13241 and 13263, the State Water Board, in establishing the requirements contained herein, considered factors including, but not limited to, the following:
a. Past, present, and probable future beneficial uses of water; b. Environmental characteristics of the hydrographic unit under consideration, including the quality of water available thereto;
c. Water quality conditions that could reasonably be achieved through the coordinated control of all factors which affect water quality in the area; d. Economic considerations;
e. The need for developing housing within the region(s); and f. The need to develop and use recycled water.

IT IS HEREBY ORDERED
IT IS HEREBY ORDERED pursuant to Water Code sections 13263 and 13267, the Discharger, its agents, successors, and assigns, in order to meet the provisions contained in division 7 of the Water Code and regulations adopted hereunder, shall comply with the following:

PROHIBITIONS

1. Any feedstock, additive, amendment, or compost (active, curing, or final product) stored, processed, or composted outside of the designated composting operation areas, as those boundaries are specified in an NOI and/or a technical report, and approved by the Regional Water Board, is prohibited.

August 4, 2015
16 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. Any volume of any feedstock, additive, amendment, or compost (active, curing, or final product) exceeding those specified in this General Order is prohibited.

3. Use of any feedstock, additive, amendment, or material, other than those described in this General Order is prohibited.

4. Discharge of any of the following wastes, including storage thereof, at a composting operation under this General Order is prohibited:
a. Animal carcasses;
b. Liquid wastes other than those of food origin;
c. Medical wastes as defined in the Health and Safety Code section 117690; d. Radioactive wastes;
e. Septage;
f. Sludge, including but not limited to sewage sludge, water treatment sludge, and industrial sludge;
g. Wastes classified as “designated” as defined in Water Code section 13173; h. Wastes classified as “hazardous” as defined in California Code of Regulations, title 22, section 66261.3;
i. Wood containing lead-based paint or wood preservatives, or ash from such wood; or j. Any feedstock, additive, or amendment other than those specifically described in this General Order, unless approved by the Regional Water Board.

5. Discharges of feedstocks, additives, amendments, or wastes to lands not owned, leased, or otherwise controlled by the Discharger for the purposes of composting is prohibited.

6. Discharge of wastes to surface waters is prohibited, except as authorized by an NPDES permit.

7. Discharge of wastes including overflow, wastewater, or bypass from transport, treatment, storage, or disposal systems to adjacent drainages or adjacent properties is prohibited.

8. Use of biosolids as a feedstock with concentrations of a metal that exceeds the ceiling concentration presented in 40 Code of Federal Regulations section 503.13 (Table 1), is prohibited.

9. Use of biosolids as an additive or amendment is prohibited.

10. Use of anaerobic digestate derived from sewage sludge as an additive or amendment is prohibited.

11. Evapo-concentration of constituents in any detention pond that results in hazardous constituent concentration levels, as defined in California Code of Regulations, title 22, section 66261.3 is prohibited.

August 4, 2015
17 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

SPECIFICATIONS

1. The use of additives defined in this General Order, and Attachment A, is allowed provided that the additives meet the following specifications.
a. For Tier I facilities, the following approved additives may comprise no more than 10 percent combined, on a total volume basis, of the total feedstocks for any given batch of compost:
1) Fertilizing material applied at rates that will be consumed or fixed/immobilized during active composting;
2) Manure;
3) Anaerobic digestate (solid) derived from any material other than allowable Tier I feedstocks ; and/or
4) Other material specified in an NOI and/or a technical report, and approved by the Regional Water Board.
b. For Tier II facilities, the following approved additives may comprise no more than 30 percent combined (other than liquid food material), on a total volume basis, of the total feedstocks for any given batch of compost:
1) Fertilizing material applied at rates that will be consumed or fixed/immobilized during active composting;
2) Liquid food material specified in an NOI and/or a technical report, and approved by the Regional Water Board, and applied at a rate that prevents conditions leading to pollution or nuisance, as defined in Water Code section 13050; 3) Anaerobic digestate (solid) derived from any material other than allowable Tier I and Tier II feedstocks; and/or
4) Other material specified in an NOI and/or a technical report, and approved by the Regional Water Board.

2. Additives and amendments must be handled, stored, and processed in the manner specified in the NOI and/or technical report and approved by the Regional Water Board.

3. All feedstocks, additives, amendments, and compost (active, curing, or final product) must not cause, threaten to cause, or contribute to conditions of pollution, contamination, or nuisance. These discharges must comply with the applicable Basin Plan requirements.

4. All feedstocks, additives, amendments, and compost (active, curing, or final product) must be located on containment structures designed and constructed as required by this General Order.

5. Dischargers must submit with the NOI and technical report, a Water and Wastewater Management Plan that describes how wastewater will be managed to prevent discharge.

The plan must describe the design, operations, and maintenance of the systems, including water balance calculations and assumptions, if required.

6. Wastewater shall be handled and managed in accordance with an approved Water and Wastewater Management Plan in the technical report described in Attachment D.

August 4, 2015
18 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

7. Feedstocks for composting shall be limited to the allowable Tier I and Tier II feedstocks listed in Table 2 and defined in Attachment A.

8. Composting operations shall be setback at least 100 feet from the nearest surface water body and/or the nearest water supply well. A lesser setback distance may be allowed by the Regional Water Board if the Discharger can demonstrate that the groundwater, geologic, topographic, and well construction conditions at the site are adequate to protect water quality.

9. For Tier I and Tier II facilities, the type of amendments must be specified in a NOI and/or a technical report.

DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – ALL TIERS

1. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be designed to limit water quality degradation. Working surfaces and containment structures must be designed, constructed, operated and maintained to:
a. Facilitate drainage and minimize ponding by sloping or crowning pads to reduce infiltration of liquids;
b. Reliably transmit free liquid present during storage, treatment, and processing of materials to a containment structure to minimize the potential for waste constituents to enter groundwater or surface water; and
c. Prevent conditions that could contribute to, cause, or threaten to cause a condition of contamination, pollution, or nuisance.

2. Working surfaces must be constructed to allow year round equipment access to feedstocks, additives, amendments, and compost (active, curing, or final product) without damage to the working surfaces and containment structures.

3. To prevent potential impacts to waters of the state, the Discharger must minimize the potential for piles of feedstocks, additives, amendments, or compost (active, curing, or final product) to become over-saturated and generate wastewater.

4. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be designed, constructed, and maintained to control and manage all run-on, runoff, and precipitation which falls onto or within the boundaries of these areas, from a 25-year, 24-hour peak storm event at a minimum.

5. Areas used for receiving, processing, or storing feedstocks, additives, amendments, or compost (active, curing, or final product) must be protected from inundation by surface flows associated with a 25-year, 24-hour peak storm event at a minimum.

6. Detention ponds, if used, must be designed, constructed, and maintained to prevent conditions contributing to, causing, or threatening to cause contamination, pollution, or nuisance, and must be capable of containing, without overflow or overtopping (taking into consideration the crest of wind-driven waves and water reused in the composting August 4, 2015
19 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS operation), all runoff from the working surfaces in addition to precipitation that falls into the detention pond from a 25-year, 24-hour peak storm event at a minimum, or equivalent alternative approved by the Regional Water Board.

7. Detention ponds, if used, shall be managed as described in the facility’s Water and Wastewater Management Plan.

8. Detention ponds, if used, must be managed to maintain a dissolved oxygen concentration in the upper zone (one foot) of at least 1.0 milligrams per liter (mg/L).

9. Detention ponds, if used, shall be managed to mitigate breeding of mosquitoes including, but not limited to the following:
a. An erosion control program shall be implemented to ensure that small coves and irregularities are not created around the perimeter of the water surface. b. Weeds shall be minimized through control of water depth, a shoreline synthetic liner, harvesting, or herbicides.
c. Dead algae, vegetation, and debris shall be removed from the water surface. d. Coordination with the local mosquito abatement or vector control district to supplement the measures described above in cases where other methods are infeasible.

10. Berms must be designed, constructed, and maintained to prevent run-on and run-off from a 25-year, 24-hour peak storm event at a minimum. Berms must be adequately protected from erosion, and must not cause, threaten to cause, or contribute to conditions resulting in contamination, pollution, or nuisance.

11. Drainage conveyance systems must be designed, constructed, and maintained for conveyance of wastewater from the working surface in addition to direct precipitation from a 25-year, 24-hour peak storm event at a minimum. Ditches must be properly sloped to minimize ponding and kept free and clear of debris to allow for continuous flow of liquid.

Ditches must be adequately protected from erosion, and must not cause, threaten to cause, or contribute to conditions resulting in contamination, pollution, or nuisance.

Ditches must be inspected and cleaned out prior to the wet season every year.

DESIGN, CONSTRUCTION AND OPERATION REQUIREMENTS – TIER II ONLY

1. Working surfaces must be capable of resisting damage from the movement of equipment and weight of piles, and have a hydraulic conductivity of 1.0 x 10-5 centimeters per second (cm/s) or less. Working surfaces must consist of one of the following:
a. Compacted soils, with a minimum thickness of one foot; b. Asphaltic concrete or Portland cement concrete; or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.

August 4, 2015
20 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. Detention ponds must be designed, constructed, operated, and maintained to meet a hydraulic conductivity of 1.0 x 10-6 cm/s or less. These ponds must include one of the following:
a. A liner system consisting of a 40 thousandths of an inch (mil) synthetic geomembrane (60-mil if high-density polyethylene), underlain by either one foot of compacted clay or a geosynthetic clay liner installed over a prepared base; b. A liner system that includes Portland cement concrete – designed to minimize cracking and infiltration – underlain by a 40-mil synthetic geomembrane (60-mil if high-density polyethylene); or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.

3. Detention ponds must be designed and constructed with a pan lysimeter monitoring device under the lowest point of the pond, or an equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board. The engineered alternative must provide equivalent assurance of the earliest possible detection or prevention of a release from the pond.

4. Tanks, if used, must be designed, operated, maintained and monitored in accordance with applicable laws and regulations.

5. Drainage ditches must be designed, constructed, and maintained to convey all precipitation and runoff from a 25-year, 24-hour peak storm event at a minimum and have a hydraulic conductivity of 1.0 x 10-5 cm/s or less, and be lined with one of the following:
a. Compacted soils, with a minimum thickness of one foot; b. Asphaltic concrete or Portland cement concrete; or
c. An equivalent engineered alternative specified in an NOI and/or a technical report, and approved by the Regional Water Board.

MONITORING REQUIREMENTS

1. Dischargers subject to this General Order must implement the applicable requirements specified in Attachment B, the MRP, which are hereby incorporated by reference as part of this General Order.

2. Pursuant to Water Code section 13267, the Discharger must comply with the applicable requirements specified in the MRP (Attachment B). If a site-specific MRP becomes necessary, the Discharger must comply with requirements specified in an individual MRP issued to the Discharger by the Regional Water Board. Failure to comply with the applicable requirements specified in Attachment B or a site-specific MRP issued by the Regional Water Board may subject the Discharger to civil liability. (Wat. Code, § 13268.)

3. In lieu of meeting hydraulic conductivity specifications for Tier II working surfaces and drainage ditches, the Discharger may implement a groundwater protection monitoring program. The Discharger shall confirm this intention by submitting a complete August 4, 2015
21 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Groundwater Protection Monitoring Plan in the technical report with the NOI, as described in Attachment D.

4. Within 90 days of issuance of an NOA, the Discharger shall implement the approved Groundwater Protection Monitoring Plan, if applicable.

MAINTENANCE REQUIREMENTS

1. The Discharger shall maintain containment structures (e.g. berms, pads, detention ponds, tanks, run-on/run-off control structures, etc.) and monitoring systems (e.g. groundwater monitoring devices) in good working order.

2. The Discharger must regularly inspect and maintain all containment structures and monitoring systems pursuant to this General Order, MRP, and NOA. The frequency of inspections must be sufficient to prevent feedstocks, additives, amendments, compost (active, curing, or final product), or wastewater from creating, threatening to create, or contributing to conditions of contamination, pollution, or nuisance.

SITE CLOSURE REQUIREMENTS

1. Release of wastes or waste-derived constituents at an unmanaged, inactive, or abandoned composting operation may cause, threaten to cause, or contribute to degradation of the waters of the state. At least 90 days prior to ceasing composting operations, the discharger shall submit a Site Closure Plan to the Regional Water Board for approval.

2. The Discharger must jointly notify the appropriate Regional Water Board and Local Enforcement Agency in writing at the conclusion of the site closure activities that describes closure in accordance with the Site Closure Plan and Regional Water Board requirements.

REPORT REQUIREMENTS

1. General Reporting Requirements – The Discharger must furnish the following information within a timeframe specified by the Regional Water Board:
a. Any information which the Regional Water Board may request to determine compliance with this General Order; and
b. Copies of records required to be kept by this General Order.

2. NOI and Technical Report – The Discharger must submit an NOI and technical report as specified in Attachments C and D of this General Order. The Discharger must submit general information, site conditions, design, operations and monitoring information and a compliance schedule for existing facilities. The Discharger must submit a technical report with design information at least 90 days prior to any new construction of any working surfaces, detention ponds, berms, ditches, or any other water quality protection containment structure for approval by the appropriate Regional Water Board. The design information must include water balance calculations for detention ponds, design of August 4, 2015
22 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS wastewater conveyance features, liner materials and thicknesses, and rationale for liner system design. The technical report must ensure testing and quality assurance of liner materials and compacted soils in accordance with commonly accepted engineering practices, American Society for Testing and Materials test methods, and/or other appropriate material standards.

3. Final Post-Construction Report – The Discharger must submit a post-construction report to the Regional Water Board within 60 days of completing all construction activities associated with all applicable containment and monitoring structures, as required for compliance with this General Order and the MRP. The post-construction report must contain as-built plans and specifications to document that containment and monitoring structures were properly constructed and tested.

4. Annual Monitoring and Maintenance Report - The Discharger must submit an Annual Monitoring and Maintenance Report to the appropriate Regional Water Board no later than April 1st of each year (or next subsequent business day, if falling on a weekend or state-observed holiday), as described in the MRP. The Annual Monitoring and Maintenance Report must summarize all monitoring and maintenance activities performed and adverse conditions noted since the prior reporting period with respect to all berms, ditches, working surfaces, detention ponds, and monitoring systems. As part of the Annual Monitoring and Maintenance Report, the Discharger must certify that the composting operation complies with the requirements of this General Order and applicable portions of the MRP.

5. Reporting Declaration - All applications, reports, or information submitted to the Regional Water Boards must be signed and certified as follows:
a. The NOI must be signed as follows:
1) For a corporation - by a principal executive officer of at least the level of vice president;
2) For a partnership or sole proprietorship - by a general partner or the proprietor, respectively;
3) For a municipality, state, federal, or other public agency - by either a principal executive officer or ranking elected official; or
4) For a military facility - by the base commander or person with authority and responsibility for environmental matters at the facility. b. All other reports required by this General Order and other information required by the Regional Water Board must be signed by a person designated in paragraph (a) above, or by a duly authorized representative of that person. An individual is a duly authorized representative only if:
1) The authorization is made in writing by a person described in paragraph (a) above;
2) The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity; and 3) The written authorization is submitted to the Regional Water Board.

August 4, 2015
23 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Any person signing a document under this section must make the following certification:
"I certify under penalty of law that this document, including all attachments and supplemental information, were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment."

6. Report Submittals –The State Water Board and Regional Water Boards are transitioning to the paperless office system. Dischargers must submit reports (both technical and monitoring reports) to the State Water Board’s GeoTracker database over the Internet in portable document format (PDF) as specified in California Code of Regulations, title 23, section 3892, subdivision (d) and section 3893. In addition, analytical data must be uploaded to the GeoTracker database under a site-specific global identification number.

Information on the GeoTracker database is provided at:
http://www.swrcb.ca.gov/ust/electronic_submittal/index.shtml;

7. Use of Licensed Professionals – The Business and Professions Code sections 6735, 7835, and 7835.1 require that engineering and geologic evaluations and judgments be performed by or under the direction of licensed professionals. Any plan or report submitted in compliance with the requirements of this General Order, which requires technical interpretation, or proposes either a design, or a design change that might affect the composting operation’s containment features, detention ponds, or monitoring systems must be prepared by, or under the direction of, appropriately licensed professionals (e.g., registered civil engineer, professional geologist, or other registered certified specialty geologist) by the State of California. In addition, the licensee must sign and provide his or her registration number, or stamp the submitted plan or report.

NOTIFICATION REQUIREMENTS

1. Revised Notice of Intent – The Discharger must submit a revised NOI to the Regional Water Board, CalRecycle, and the Local Enforcement Agency at least 90 days prior to:
(1) adding a new feedstock, additive, or amendment; (2) changing material or construction specifications; (3) changing a monitoring program; or (4) changing an operation or activity that was not described in the approved NOI and technical report. The Regional Water Board may require submittal of a revised technical report.

2. Change in Ownership Notification Requirements – The Discharger must notify the Regional Water Board, CalRecycle, and the Local Enforcement Agency, in writing, at least August 4, 2015
24 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS 30 days in advance of any transfer of the General Order’s responsibility and coverage from the current owner to a new owner. This notification shall include:
a. A statement of acknowledgment that the current owner is liable for violations occurring up to the transfer date and that the new owner is liable for violations occurring after the date that ownership of the property transfers; and b. The new owner’s NOI and technical report (if applicable).

3. Termination of Enrollment – Enrollment under this General Order may be terminated if any of the following occur:
a. The Regional Water Board, based on site-specific conditions or management practices, may require the Discharger to apply for individual WDRs. The applicability of this General Order to such dischargers will be rescinded upon adoption of individual WDRs;
b. At least 90 days prior to terminating all waste discharge activates, the Discharger must submit a Site Closure Plan to the Regional Water Board for approval. Filing a request by the Discharger for termination of this General Order does not stay any requirements of this General Order; or
c. If the operation is eligible for an exemption due to changes in process or procedures, the Discharger may propose termination. Filing a request by the Discharger for an exemption modification, revocation, reissuance, or termination of this General Order does not stay any requirement of this General Order.

4. Notification of Violations – If a violation of requirements of this General Order or MRP occurs, the Discharger must notify the Regional Water Board by telephone or email, within 48hours, once the Discharger has knowledge of the violation. This notification must include a description of the noncompliance and its cause, the period of noncompliance (dates and times); and if the noncompliance has not been corrected, the anticipated time the noncompliance is expected to continue. The notification must also include steps taken or planned to reduce, eliminate, or prevent recurrence of the noncompliance. Depending on the severity of the violation, the Regional Water Board may require the Discharger to submit a separate technical report regarding the violation within 10 working days of the initial notification.

5. Monitoring Wells – The Discharger must comply with all notice and reporting requirements of the Department of Water Resources, and with any local agency well permitting requirements regarding construction, alteration, destruction, or abandonment of any monitoring wells used for compliance with this General Order and MRP, as required under Water Code sections 13750.5 through 13755, and local agency requirements

ADDITIONAL REQUIREMENTS

1. Duty to Comply – Any noncompliance with this General Order constitutes a violation of the Water Code, and is grounds for enforcement action, and/or termination of enrollment under this General Order.

August 4, 2015
25 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. Corrective Action – The Discharger must take all reasonable steps to minimize or correct any adverse impact to the environment resulting from noncompliance with this General Order, including accelerated or additional monitoring necessary to determine the nature and impact of the noncompliance.

3. Responsibility for Monitoring and Maintenance – Dischargers must be responsible for covering the costs associated with the activities necessary to maintain compliance with this General Order.

4. Maintenance Period – The maintenance period must continue until the Regional Water Board finds that all feedstocks, additives, amendments, compost (active, curing, or final product), wastewater, or other waste constituents or degradation products will not threaten waters of the state.

5. Revision of Waste Discharge Requirements – Enrollment under this General Order may be modified, revoked, reissued, or terminated for causes including, but not limited to, the following:
a. Violation of any terms or conditions of this General Order, b. Obtaining this General Order by misrepresentation or failure to disclose relevant facts, or
c. A change in any condition that requires a reduction or elimination of the authorized discharge.

Filing a request by the Discharger for modification, revocation, re-issuance, or termination of this General Order or notification of planned changes or anticipated noncompliance does not stay any condition of this General Order.

6. Change in Ownership – This General Order is not transferable to any person except after notice to the Regional Water Board, CalRecycle, and the Local Enforcement Agency. The Discharger must submit a Change in Ownership Notification, pursuant to the Notification Requirements section of this General Order.

7. Property Rights – This General Order does not convey any property rights of any sort or any exclusive privileges. Requirements prescribed herein do not authorize commission of any act causing injury to persons or property, nor protect the Discharger from liability under federal, state, or local laws or regulations, nor create a vested right for the owner and operator to continue the regulated activity.

8. Entry and Inspection – Under authority of Water Code section 13267, the Discharger must allow the State Water Board and/or Regional Water Board, or an authorized representative, upon presentation of credentials and other documents as may be required by law to:
a. Enter premises where a regulated facility or activity is located or conducted, or where records must be kept under specification of this General Order; b. Have access to copy, at reasonable times, any records that must be kept under specification of this General Order;
August 4, 2015
26 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Inspect any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or specified under this General Order; d. Sample or monitor for the purposes of determining compliance with this General Order, any substances or parameters at any location; and e. Photograph or video-record any structures, facilities, activities, or other conditions to determine compliance with this General Order.

9. Repository for Waste Discharge Requirements – A complete and correct copy of this General Order, the NOA, and any pertinent technical documents must be maintained at the local offices of the Discharger, and must be available to facility personnel at all times.

10. Severability – Provisions of this General Order are severable, and if any provision of this General Order or application of any provision of this General Order to any circumstance is held invalid, application of such provisions to other circumstances and the remainder of this General Order must not be affected thereby.

11. Effective Date – This General Order becomes effective upon its adoption by the State Water Board.

12. Penalties for Investigations, Monitoring, or Inspection Violations – The State Water Board and Regional Water Boards reserve the right to take any enforcement action authorized by law for violations of any terms and conditions of this General Order. 13 Civil Monetary Remedies – Water Code section 13350 et seq. provides that any person who intentionally or negligently violates any conditions issued or amended by the Regional Water Board or State Water Board, is subject to administrative civil liability of up to $10 per gallon of waste discharged, or up to $5,000 per day of violation. The Superior Court may impose civil liability of up to $10,000 per day of violation or, if a cleanup and abatement order has been issued, up to $15,000 per day of violation.

14. Other Regulations – Dischargers enrolled under this General Order may be subject to additional federal, state, or local regulations.

15. Requesting Judicial Review – Any person aggrieved by this General Order may, not later than 30 days from the date of adoption, file a petition for a writ of mandate for judicial review. Petitions that are not received within 30 days of the State Water Board’s adoption of the General Order will not be eligible for review by any court. (Wat. Code, § 13330 et seq.)

16. Delegation of Authority – By adoption of this General Order, the State Water Board delegates to the nine Regional Water Board Executive Officers, all powers and authority that may be delegated pursuant to Water Code section 13223. The State Water Board intends for the Executive Officers to make modifications or revisions in appropriate cases, to the maintenance and monitoring requirements contained within the MRP for Dischargers enrolled under this General Order; and to grant Dischargers enrollment or termination under this General Order and MRP pursuant to eligibility and termination criteria established in this General Order.

August 4, 2015
27 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

CERTIFICATION
The undersigned, Clerk to the Board, does hereby certify that the foregoing is a full, true, and correct copy of an order duly and regularly adopted at a meeting of the State Water Resources Control Board held on August 4, 2015.

AYE: Chair Felicia Marcus
Vice Chair Frances Spivy-Weber
Board Member Tam M. Doduc
Board Member Steven Moore
Board Member Dorene D’Adamo
NAY: None
ABSENT: None
ABSTAIN: None
Jeanine Townsend
Clerk to the Board
August 4, 2015
28 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015
29 STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

ATTACHMENT A - DEFINITIONS
For the purposes of this General Order, the following terms, phrases, or abbreviations have a narrow scope of meaning, and are as follows:

Active Compost - Compost feedstock that is in the process of being rapidly decomposed and is unstable. Active compost is generating temperatures of at least 50 degrees Celsius (122 degrees Fahrenheit) during decomposition, or is releasing carbon dioxide at a rate of at least 15 milligrams per gram of active compost per day, or the equivalent of oxygen uptake.

This high temperature on thermophilic phase may last from several days to several weeks.

Additives - Material mixed with feedstocks or active compost in order to adjust the moisture level, carbon to nitrogen ratio, or porosity to create a favorable condition. Additives include, but are not limited to, fertilizers and urea. Additives do not include septage, biosolids, or compost feedstock.

Agricultural Composting - The operation of composting conducted in agricultural settings where: (1) feedstocks consist of materials generated onsite by production of farm, ranch, agricultural, horticultural, silvicultural, floricultural, vermicultural, or viticultural products, for example, orchard and vineyard prunings, culls and crop residues, and spoiled or unsalvageable food commodities (but not including animal carcasses), and; (2) the resulting compost product is returned to that same agricultural site, or an agricultural site owned by the owner of the composting activity and applied at an agronomic rate. No more than an incidental amount of up to 1,000 cubic yards of compost product may be given away or sold annually.

Agricultural Material - Consists of pre-consumer plant materials coming directly from lands used in the production of farm, agricultural, horticultural, aquacultures, silvicultural, floricultural, vermicultural, or viticultural products, including orchard and vineyard prunings, and crop residues. Agricultural material does not include manure.

Amendments - Materials added to stabilized compost or cured compost to provide attributes for certain compost products, such as product bulk, product nutrient value, product pH, and soils blend. Amendments do not include septage, biosolids, or compost feedstock.

Anaerobic Digestate - The solid portion of the material remaining after the anaerobic digestion of any combination of agricultural materials, biosolids, sewage sludge, food materials, green materials, manure, paper materials, or vegetative food materials. Dewatered digestate contains organic matter that may need to be further treated to stabilize it, usually through aerated composting.

Animal Carcasses - Refers to any whole or part (including, but may not be limited to the flesh, organs, blood, bones, and marrow) of a carcass of a bird, fish, or mammal, which cannot meet the definition of “food material.”
A-1
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Background Water Quality - The concentrations or measures of constituents or indicator parameters in water or soil that have not been affected by waste constituents from the area being monitored.

Beneficial Uses - Pursuant to division 7, section 13050, subdivision (f) of the Water Code. “Beneficial uses” of waters of the state that may be protected against degradation include, but are not limited to, domestic, municipal, agricultural and industrial supply, power generation, recreation, aesthetic enjoyment, navigation, and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.

Best Management Practice - A practice, or combination of practices, that is the most effective and feasible means of controlling degradation or pollution generated by nonpoint sources for the attainment of water quality objectives.

Biosolids - Sewage sludge that has been treated, tested, and meets:

1. The Ceiling Concentration Limits in Table 1 of 40 Code of Federal Regulations section 503.13;

2. The Class A or Class B pathogen control requirements in 40 Code of Federal Regulations part 503.32(a) or (b); and

3. One of the Vector Attraction Reduction requirements in 40 Code of Federal Regulations part 503.33(b)(1—8).

Exceptional Quality (EQ) biosolids – Biosolids meeting metals standards, Class A pathogen reduction standards, and one of the vector attraction reduction standards contained in 40 Code of Federal Regulations sections 503.13 (Table 3), section 503.32(a), and section 503.33(b) (1—8), respectively
Brine - Water saturated with or containing large amounts of common salt (sodium chloride), or a strong saline solution (e.g., calcium chloride).

California Environmental Quality Act (CEQA) - Refers to the statute promulgated in Public Resources Code, beginning with section 21000, and regulations promulgated in California Code of Regulations, title 14, chapter 3, beginning with section 15000, requiring state and local agencies to identify the significant environmental impacts of their actions and to avoid or mitigate those impacts, if feasible.

CalRecycle - The Department of Resources Recycling and Recovery (formerly the California Integrated Waste Management Board), which is the lead agency for implementing the state’s municipal solid waste permit program that is deemed to be adequate by U.S. EPA under regulations published pursuant to sections 2002 and 4005 of the Resource Conservation and Recovery Act of 1976.

Chipping and Grinding Facilities and Operations - Facilities or operational areas that do not produce compost, but mechanically reduce the size or otherwise engage in the handling of “green material.” Each load of “green material” must be removed from the site within 48-hours A-2
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS from receipt, unless the Discharger has received written permission from the Local Enforcement Agency allowing the “green material” to remain onsite for up to 7 days.

Composting - A controlled microbial degradation of organic wastes yielding a safe and nuisance-free product.

Composting Conducted at a Publicly Owned Treatment Works - Refers to the composting of treated biosolids at a publicly owned treatment works, currently operating pursuant to permit or waste discharge requirements issued by a Regional Water Board or the State Water Board.

Composting Operation - shall mean the areas at which operations are conducted, including the receiving area, pre-processing, processing, curing, storage areas, detention ponds, and other areas associated with production of compost, including storage areas for feedstocks, additives, and/or amendments.

Constituent - An element or compound which occurs in or is likely to be derived from waste handled by a composting operation.

Constituent(s) of Concern - Any waste constituent(s), reaction product(s), and hazardous constituent(s) that is reasonably expected to be in or derived from waste handled by the composting operation.

Construction Quality Assurance - A planned system of activities that provides assurance that the facility or component thereof, is constructed as specified in the approved design. As used in this General Order, the term includes “Construction Quality Control,” a planned system of inspections that is used to directly monitor and control the quality of a construction project.

Containment Structures - Refers to any berm, ditch, working surface, detention pond, or other mechanism approved by the Regional Water Board at a Composting Operation designed, constructed, and maintained to limit feedstocks, additives, amendments, and/or compost (active, curing, or final product) from threatening to cause, causing, or contributing to conditions of contamination, pollution, or nuisance.

Contamination - Defined in section 13050, subdivision (k) of the Water Code.

Curing Compost - The final stage of the composting process that occurs after compost has undergone pathogen reduction, as defined in California Code of Regulations title 14, section 17868.3, and after most of the readily metabolized material has been decomposed and stabilized. This curing phase begins after an active compost pile endures a sustained drop in temperature as remaining materials continue to decompose, but at a much slower rate. This helps to further decompose and stabilize potentially toxic organic acids and resistant compounds. The curing process helps bring compost to full-maturity, and can last several months.

Day - A calendar day unless otherwise specified.

A-3
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Depth to Groundwater - The vertical distance measured, in feet, from the ground surface to the highest anticipated groundwater level.

Detention Pond - An excavated or diked area designed to capture and hold any wastewater.

Discharge - The accidental or intentional spilling, leaking, pumping, pouring, emitting, emptying or dumping of wastes into or on any land or water.

Discharger - Any person who discharges waste which could affect the quality of waters of the state, and includes any person who owns a Composting Operation or who is responsible for the operation.

Distance to Nearest Water Supply Well - The horizontal distance measured, in feet, from the nearest edge of the composting operation to the center of the water supply well head.

Distance to Nearest Surface Water - Horizontal distance measured, in feet, from the nearest edge of the composting operation to the edge of the high water mark for lakes and reservoirs, mean high tide line for tidally influenced water bodies, or the natural or levied bank for creeks and rivers.

Electronic Deliverable Format - Defined in California Code of Regulations, title 23, division 3, chapter 30, article 1, section 3891.

Evapo-concentration - The process by which the ratio of solute to water solvent is increased by the removal of the solvent and retention of the solute.

Feedstocks - Materials used in the production of compost. Feedstocks shall not be considered as either additives or amendments.

Fertilizing Material - Defined in division 7, section 14533 of the Food and Agriculture Code.

Final Product - The compost material that has completed the curing phase. Residual substances originally present in the compost pile are consumed after proper curing. The compost has been brought to maturity, and organic acids and resistant compounds have been substantially decomposed.

Food Material - Solid, and/or semi-solid materials resulting from the production or processing of food for animal or human consumption, but is no longer intended for such consumption, that is separated from the municipal solid waste stream. Food material includes, without limitation, food waste from food facilities (as defined in Health and Safety Code, section 113789), food processing establishments (as defined in Health and Safety Code, section 111955), grocery stores, institutional cafeterias (such as prisons, schools, and hospitals), restaurants, and residential food scrap collection. Food material may include meat and materials incidental to a food scrap collection program. Food material shall not contain any substance included in the Prohibitions section of this General Order.

Geocomposite Liner - A manufactured material using geotextiles, geogrids, geonets, and/or geomembranes in laminated or composite form.

A-4
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Geomembrane - Flexible materials in planar form manufactured to meet specific engineering purposes. Commonly, they are used as a barrier to waste solids and fluids. The term “geomembrane” is synonymous with “synthetic liner” and “flexible membrane liner”.

GeoTracker - The State Water Board database as defined in California Code of Regulations, title 23, section 3891.

Green Composting Waiver - Refers to the “Conditional Waiver of Waste Discharge Requirements for Composting Operations.” Adopted by most Regional Water Boards in 1996, this waiver covered the composting of green waste, some food processing waste, agricultural waste, and paper waste discharged to land with a volume in excess of 500 cubic yards.

Green Material - Any plant material that is separated at the point of generation and consists of, or contains, materials from plants, including leaves, clippings, cuttings, trimmings of grass, weeds, shrubbery, bushes, or trees, residential or community garden waste, and untreated wood waste. Green material does not include food material, biosolids, material processed from commingled collection, wood containing lead-based paint or wood preservative, mixed construction or mixed demolition debris.

Groundwater - Water below the ground surface that is at or above atmospheric pressure (i.e., perched, unconfined, or confined water).

Groundwater Elevation - The vertical distance measured, in feet, from mean sea level to the water table of the first encountered groundwater below the ground surface.

Hydraulic conductivity - The ability of natural and artificial materials to transmit fluid. For water, including aqueous solutions, the term is expressed as a measure of the rate of flow (e.g., cubic centimeters per second) one can expect through a unit-area (e.g., one square centimeter) cross section of the material under a unit hydraulic gradient (e.g., one centimeter of head loss per centimeter of travel through the material). The resulting numerical value is expressed in velocity units (e.g., centimeters per second).

Leachate - Any liquid formed by the drainage of liquids from, or percolation/flow of liquids through any feedstock, additive, amendment, or compost (active, curing, or final product) pile.

Liquid Food Material - Liquid materials resulting from the production or processing of food for animal or human consumption - but is no longer intended for such consumption - that is separated at the point of generation from the waste stream (e.g., cheese whey, brewery waste, etc.). Liquid food material shall not contain either: brines or any waste included in the Prohibitions section of this General Order.

Liquid Wastes - Waste materials which are not spadeable or in a physical state where the waste materials behave sufficiently like a solid to be moved by a spade at normal outdoor temperatures.

A-5
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Liner - A material or combination of materials designed, constructed, and maintained to contain any wastewater feedstock, additive, amendment, or compost (active, curing, or final product) discharged to land.

Local Enforcement Agencies (LEA) - Agencies that are designated by the governing body of a county or city and, upon certification by CalRecycle, are empowered to implement delegated CalRecycle programs and locally designated activities.

Lot Clearing for Fire Protection - Refers to the storage of yard trimmings at a publicly designated site for the collection of lot clearing necessary for fire protection provided that the public agency designating the site has notified the fire protection agency.

Manure - Accumulated excrement (e.g., cattle manure, chicken manure, pig manure), which includes feces and urine, and any bedding material, spilled feed, or soil that is mixed with feces or urine that does not exceed its moisture holding capacity.

Major Storm Event - Is defined as a minimum of one inch of precipitation within 24 hours.

Moisture Holding Capacity - The amount of liquid which can be held against gravity by waste materials without generating free liquid.

National Pollutant Discharge Elimination System (NPDES) - Refers to the national program under Clean Water Act section 402 (33 U.S.C. § 1342), for regulation of discharges of pollutants from point sources to waters of the United States. Discharges are illegal unless authorized by a National Pollutant Discharge Elimination System permit.

Nonhazardous Solid Waste - Means all putrescible and nonputrescible solid, semi-solid, and liquid wastes, including garbage, trash, refuse, paper, rubbish, ashes, industrial wastes, demolition and construction wastes, abandoned vehicles and parts thereof, discarded home and industrial appliances, manure, vegetable or animal solid and semi-solid wastes and other discarded waste (whether of solid or semi-solid consistency); provided that such wastes do not contain wastes which must be managed as hazardous wastes, or wastes which contain soluble pollutants in concentrations which exceed applicable water quality objectives, or could cause degradation of waters of the state (i.e., designated waste).

Nuisance - Defined in section 13050, subdivision (m) of the Water Code.

Pad - See definition for “working surface.”
Paper Material - Nonhazardous paper and paper by-products (including paper, cardboard, tissue, and other products manufactured from vegetative fibers).

Percolation test - A method of testing water absorption of soil. The percolation test shall be conducted as follows or an approved alternative: a minimum of six percolation tests shall be required as follows:

1. Four holes shall be spaced uniformly throughout the operations pad area to a minimum of 24 inches deep; and
A-6
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. Two holes outside the perimeter of the detention pond nearest the deepest corner. The holes shall be dug a minimum of 24 inches below the deepest part of the pond.

3. Percolation testing shall be conducted in accordance with local codes and ordinances and performed under the direction of a Professional Geologist, Civil Engineer, or Registered Environmental Health Specialist.

Pollution - Defined in section 13050, subdivision (l) of the Water Code.

Portable Document Format (PDF) - Defined in California Code of Regulations, title 23, division 3, chapter 30, article 2, section 3891.

Precipitation - Is any condensate of atmospheric water vapor and includes hail, mist, rain, sleet, or snow.

Publicly Owned Treatment Works (POTW) - Is as defined in part 403, section 403.3(q) of 40 Code of Federal Regulations.

Radioactive Material - Defined in California Code of Regulations, title 17, section 30100, subdivision (q).

Residentially co-collected or self-hauled food and green materials - Food scraps, food soiled paper, and related items that are produced in a residential setting and are set out to be co-collected with green materials (i.e. yard trimmings) as part of a municipal co-collection, or self-hauled program. No more than 10 percent of residential food material may be comingled with green materials.

Regional Water Quality Control Board (Regional Water Board) - All references to a Regional Water Board, include the Executive Officer, who may act for the Regional Water Board in carrying out this General Order. (Wat. Code, § 13050, subd. (b) & § 13223.) Residual - The waste destined for disposal or recycling, and removed from the site.

Runoff - Any precipitation, wastewater, or other liquids that drain from any part of a Composting Operation.

Run-on - Any precipitation, wastewater, or other liquids that drain onto any part of the Composting Operation.

Separated at the Point of Generation - Includes material separated from the waste stream by the generator of that material. It may also include material from a centralized facility as long as that material was kept separate from the waste stream prior to receipt by that facility and the material was not commingled with other waste during handling.

Septage - Any waste removed from a septic tank, cesspool, portable toilet, Type III marine sanitation device, or similar wastewater handling device that has not passed through a municipal wastewater treatment facility.

A-7
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Sewage Sludge - Any solid, semi-solid, or liquid residue generated during the treatment of domestic sewage in a municipal wastewater treatment facility. It includes solids removed or used during primary, secondary, or advanced wastewater treatment processes. It does not include grit or screening material generated during preliminary treatment of domestic sewage at a municipal wastewater treatment facility. Sewage sludge does not include biosolids that meet the criteria in Table 1 of 40 Code of Federal Regulations section 503.13.

Significant Maintenance Activities - Refers to, but may not be limited to, those activities which could alter existing surface drainage patterns, change the existing slope configuration, occur as a result of repairing surfaces or conveyances that were damaged, or result in the installation or destruction of any monitoring system at the composting operation (e.g., groundwater monitoring well, lysimeter, etc.).

Sludge - Refers to the solid, semi-solid, or liquid residue produced by water, wastewater, or sewage treatment processes.

Source Separated - Materials that have been separated or kept separate from the waste stream, at the point of generation, for the purpose of composting.

Tier I Feedstocks - The following are allowable Tier I feedstocks: agricultural materials, green materials, paper materials, vegetative food materials, residentially co-collected food and green materials, anaerobic digestate derived from allowable Tier I feedstocks, and a combination of allowable Tier I feedstocks.

Tier II Feedstock - The following are allowable Tier II feedstocks: food materials (non-vegetative); biosolids (Class A, B, and/or EQ) as defined by 40 Code of Federal Regulations part 503; manure; anaerobic digestate derived from allowable Tier II feedstocks; and a combination of allowable Tier I and Tier II feedstocks.

Vegetative Food Material - Food material resulting from the production or processing of food for animal or human consumption, but is no longer intended for such consumption, that is derived solely from plants and is separated from the municipal solid waste stream. Vegetative food material may be processed or cooked but must otherwise remain in its essentially natural state and no salts, preservatives, fats, oils, or other adulterants have been added.

Water Quality Control Plan (Basin Plan) - Defined in division 7, section 13050, subdivision (j) of the Water Code.

Wastewater - Refers to leachate or any other liquid flowing from, or on the working surface.

Water Boards - Refers collectively to the State Water Resources Control Board and the nine Regional Water Quality Control Boards.

Waste - Defined in Water Code section 13050, subdivision (d).

Water Quality Objectives - Defined in Water Code section 13050, subdivision (h).

Waters of the State - Defined in Water Code section 13050, subdivision (e).

A-8
August 4, 2015

ATTACHMENT A - DEFINITIONS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS Wet Season - Defined as October 1 through April 30.

Working Surface - Any area at a Composting Operation used for the storage and/or treatment of feedstocks, additives, amendments, or compost (active, curing, or final product). The final product area may be excluded from the working surface hydraulic conductivity requirements under the following conditions:
 The area is isolated in a dedicated area away from the active and curing compost;  The area is clearly marked as “final product” and
 The area is identified in the NOI and technical report and approved by the Regional Water Board.

Within Vessel and Fully enclosed - Refers to the action of receiving, composting, curing or storing any feedstock within a fully enclosed vessel or container (e.g., drum, silo, bin, bunker, tunnel, reactor, fabric-covered aerated static piles) where the organic material is covered on all sides and rests on a stable surface with environmental controls for managing all wastewaters.

A-9
August 4, 2015

THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT B – MONITORING AND REPORTING PROGRAM
This Monitoring and Reporting Program (MRP) is issued pursuant to Water Code section 13267.

The Discharger shall not implement any changes to this MRP unless and until a revised MRP is issued by the Regional Water Board.

This MRP includes monitoring, reporting and record keeping requirements for composting operations. Monitoring requirements include facility inspections, detention basin water quality, groundwater protection monitoring, and general sampling, as appropriate. Reporting includes requirements for the Annual Monitoring and Maintenance Report, notification of violations, and reporting of significant events. Record keeping describes the types of information and length of time that the Discharger must keep and maintain reports.

The Discharger owns and/or operates the composting operation subject to the NOA and this General Order. The reports are necessary to ensure that the Discharger complies with the NOA and the General Order. Pursuant to Water Code section 13267, the Discharger shall implement this MRP and shall submit monitoring reports described herein.

A. ROUTINE MONITORING REQUIREMENTS

1. FACILITY INSPECTIONS
Any discharger enrolled under this General Order must inspect the composting operation in accordance with the following schedule and record, at a minimum, the observations described below:
a. Operations Areas – Perform quarterly inspections of the working surfaces, berms, ditches, facility perimeter, erosion control best management practices (BMPs), and any other operational surfaces (as specified in the NOI and/or a technical report, and approved by the Regional Water Board). The Discharger shall include the following observations in the Annual Monitoring and Maintenance Report:
1) Date and time of inspections, along with the name of the inspector; 2) Evidence of areas of deficiency such as cracking or subsidence in the working surfaces;
3) Evidence of ponding over the working surfaces and within ditches (show affected area on a map);
4) Effectiveness of erosion control BMPs;
5) Maintenance activities associated with, but not limited to, the working surfaces, berms, ditches, and erosion control BMPs;
6) Evidence of any water or wastewater leaving or entering the facility, estimated size of affected area, and estimated flow rate (show affected area on a map); 7) Integrity of drainage systems during the wet season; and 8) Photographs of observed and corrected deficiencies.

B-1
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS b. Wastewater Management System - Perform quarterly inspections of the wastewater management system and submit the following observations and records in the Annual Monitoring and Maintenance Report:
1) Date and time of inspections along with name of inspector; 2) The overall condition of the wastewater management system (i.e. pond liner, storage tank construction, municipal wastewater connection points); 3) The available capacity within storage systems and the current volume of wastewater (gallons) or solids (cubic yards) contained; 4) Presence of odors from the wastewater management system – characterization, source, and distance from source;
5) Volume of wastewater treated and discharged, if applicable; and 6) Volume of wastewater disposed at an off-site treatment system and name and location of the wastewater treatment facility, if applicable. c. Annual Survey – Perform annual survey of the facility to confirm that all containment structures are prepared for the pending wet season. Dischargers shall conduct an annual survey prior to the anticipated wet season, but no later than August 31 and complete any necessary construction, maintenance, or repairs by October 31. The Discharger shall include the following in the Annual Monitoring and Maintenance Report:
1) The observation date and time of the survey, along with the name of the inspector
2) The type of deficiency/non-compliance observed;
3) The cause for the deficiency/noncompliance;
4) Map showing the area of deficiency/noncompliance;
5) The corrective actions undertaken, or planned to resolve the deficiency/non-compliance, including the date and time of repairs; 6) The measures undertaken by the Discharger to prevent the recurrence of the observed deficiency/noncompliance; and
7) Photographs of the observed deficiencies/noncompliance with corresponding location on the map.
d. Major Storm Events - The Discharger shall inspect all precipitation, diversion, and drainage facilities for damage within 7 days following major storm events.

Necessary repairs shall be completed within 30 days of the inspection. The Discharger shall report any damage and subsequent repairs including photographs of the problem and repairs in the Annual Monitoring and Maintenance Report.

B-2
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. DETENTION POND MONITORING (IF APPLICABLE)
a. Any Discharger enrolled under this General Order that has a detention pond to manage wastewater onsite must conduct monitoring of the wastewater within the detention pond quarterly when there is sufficient water and analyze the sample for the parameters listed Table B-1. Water sample analyses shall be conducted by a laboratory certified for such analyses by the State Water Board’s Environmental Laboratory Accreditation Program. These laboratory analyses shall be conducted in accordance with 40 Code of Federal Regulations part 136 (Guidelines Establishing Test Procedures for the Analysis of Pollutants) or other test methods approved by the Regional Water Board.

Table B-1
Detention Pond Monitoring
Constituent Units Sample Frequency Reporting Frequency
pH std. units Quarterly Annually
Dissolved Oxygen mg/L Quarterly Annually
Total Dissolved Solids mg/L Quarterly Annually
Fixed Dissolved Solids mg/L Quarterly Annually
Total Nitrogen mg/L Quarterly Annually
Specific Conductance µmhos/cm Quarterly Annually
Note: These field parameters are measured during each sampling event.

Detention Pond Leak Detection Monitoring (Tier II only) – The leak detection monitoring device (i.e. pan lysimeter) shall be checked monthly during the wet season for liquid. Upon detection of liquid in a previously dry monitoring device Discharger shall notify the Regional Water Board within 48 hours; collect a sample and analyze the liquid for the constituents listed in Table B-1; remove the liquid from the device; and continue to monitor weekly. If liquid reappears, another sample must be collected and analyzed for the constituents in Table B-1. If the liquid is confirmed to be wastewater, the Discharger must submit a Response Action Plan within 30 days for review and approval by the Regional Water Board. b. The results of any monitoring conducted more frequently than required at the locations specified in this General Order shall be reported to the Regional Water Board.

3. BIOSOLIDS MONITORING (IF APPLICABLE)
a. Any Discharger enrolled under this General Order that uses biosolids as a feedstock, shall present analytical results from a certified laboratory to show proof that the biosolids meet, at a minimum, with the ceiling concentrations listed in Table 1 of 40 Code of Federal Regulations part 503. Biosolids may be characterized by the entity that generates or otherwise processes the material. Use of analytical data prepared by such an entity may be accepted in lieu of the sampling listed below. The characterization shall contain a description of the sample procedures, the analytical B-3
August 4, 2015

Table B-2
Biosolids Monitoring

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS report, and a statement by a responsible person that the characterization was performed in a way that accurately characterizes the quality of the biosolids. The statement shall be signed by, and shall contain the certification language contained in the General Order under Reporting Requirements. U.S. EPA regularly reviews, and may revise, the limitations and requirements of 40 Code of Federal Regulations part 503 and should be reviewed for updates.
b. Any discharger enrolled under this General Order that uses biosolids as a feedstock and does not show results from a certified laboratory shall perform monitoring to characterize the material for the parameters listed in Table B-2. The characterization shall contain a description of the sample procedures, the analytical report, and a statement by a responsible person that the characterization was performed in a way that accurately characterizes the quality of the biosolids. The statement shall be signed by, and shall contain the certification language contained in the General Order under Reporting Requirements.

Constituent Units Sample Frequency Reporting Frequency
Arsenic mg/kg Sample each delivery Annually
Cadmium mg/kg Sample each delivery Annually
Copper mg/kg Sample each delivery Annually
Lead mg/kg Sample each delivery Annually
Mercury mg/kg Sample each delivery Annually
Molybdenum mg/kg Sample each delivery Annually
Nickel mg/kg Sample each delivery Annually
Selenium mg/kg Sample each delivery Annually
Zinc mg/kg Sample each delivery Annually

4. GROUNDWATER PROTECTION MONITORING (IF APPLICABLE)
a. A Discharger that is required to perform groundwater monitoring due to site conditions shall perform the monitoring shown in Table B-3. Sample analysis shall be conducted by a laboratory certified by the State Water Board’s Environmental Laboratory Accreditation Program. These laboratory analyses shall be conducted in accordance with 40 Code of Federal Regulations part 136 (Guidelines Establishing Test Procedures for the Analysis of Pollutants) or other test methods approved by the Regional Water Board.
b. Discharger is required to implement the sampling and analysis program detailed in the approved Groundwater Protection Monitoring Plan submitted with the NOI as part of the accompanying technical report described in Attachment D, which is hereby incorporated by reference as part of this MRP.

B-4
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. The results of any monitoring conducted more frequently than required at the locations specified in this General Order shall be reported to the Regional Water Board.

Table B-3
Groundwater Monitoring
Constituent Units Sample Frequency Reporting Frequency
Groundwater Elevation a 0.01 Feet Quarterly Annually
Depth to Groundwater 0.01 Feet Quarterly Annually
Gradient Feet/Feet Quarterly Annually
Gradient Direction Degrees Quarterly Annually
pH Std. Units Quarterly Annually
Total Dissolved Solids mg/L Quarterly Annually
Nitrate as Nitrogen mg/L Quarterly Annually
Sodium mg/L Quarterly Annually
Chloride mg/L Quarterly Annually
Total Coliform Organisms b MPN/100 mL Quarterly Annually a. Groundwater elevation shall be based on depth to water using a surveyed measuring point elevation on the well and a surveyed reference elevation. b. Using a minimum of 15 tubes, or three dilutions.

5. GENERAL SAMPLING REQUIREMENTS
a. The Discharger shall use clean sample containers and sample handling, storage, and preservation methods that are accepted or recommended by the selected analytical laboratory or, as appropriate, in accordance with approved U.S. EPA analytical methods.
b. All samples collected shall be representative of the volume and nature of the material being sampled.
c. All sample containers shall be labeled and records maintained to show the time and date of collection as well as the person collecting the sample and the sample location.
d. All samples collected for laboratory analyses shall be preserved and submitted to the laboratory within the required holding time appropriate for the analytical method used and the constituents analyzed.
e. All samples submitted to a laboratory for analyses shall be identified in a properly completed and signed Chain of Custody form.
f. Field instruments may be used provided:
1) The operator is trained in the proper use and maintenance of the instruments; 2) The instruments are field calibrated prior to each monitoring event; and 3) Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency.

B-5
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS g. Analytical results falling between the method detection limit (MDL) and the practical quantitation limit (PQL) shall be reported as “estimated,” be accompanied by documents reporting both the MDL and PQL values for that analytical run, and be flagged appropriately (i.e., “J-flagged”).
h. MDLs and PQLs shall be derived by the laboratory for each analytical procedure in accordance with the State Water Board’s Environmental Laboratory Accreditation Program. In a relatively interference-free laboratory, derived MDLs and PQLs are expected to agree closely with published U.S. EPA MDLs and PQLs. i. If the laboratory suspects that, due to a change in matrix or other effects, the MDL or PQL for a particular analytical run differs significantly from historic MDL or PQL values, results shall be flagged and reported in the quality assurance/quality control (QA/QC) report.
j. The MDL shall always be calculated such that it represents the lowest achievable concentration associated with a 99 percent reliability of non-zero results. k. The PQL shall represent the lowest concentration at which a numerical value can be assigned with reasonable certainty.
l. All quality assurance/quality control data shall be reported, along with sample results to which it applies. This information shall include method, equipment, analytical detection, quantitation limits, recovery rates, an explanation for any recovery rate that is outside method specifications, results of equipment and method blanks, results of matrix spikes and surrogate samples, and the frequency of quality control analysis. Sample results shall be reported unadjusted for blank results or spike recovery. In cases where contaminants are detected in the quality assurance/quality control samples (i.e., field, trip, or laboratory blanks), the accompanying sample results shall be appropriately flagged.

B. REPORTING REQUIREMENTS

1. ANNUAL MONITORING AND MAINTENANCE REPORT
The Annual Monitoring and Maintenance Report shall be submitted to the Regional Water Board by April 1st each year. The Discharger must submit this report in a searchable, electronic format (i.e., Portable Document Format (PDF) and Electronic Deliverable Format (EDF) via the State Water Board’s Internet GeoTracker system at <http://geotracker.waterboards.ca.gov/> as required by this General Order. The report must include the following:
a. A transmittal letter explaining the essential points shall accompany each report. At a minimum, the transmittal letter shall identify any violations found since the last report was submitted and a description of the actions taken or planned for correcting those violations, including any references to previously submitted time schedules. If no violations have occurred since the last submittal, this shall be stated in the transmittal letter;
b. A map or aerial photograph showing the locations of observation stations and monitoring points;
B-6
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. Tabular and graphical summaries of all water quality data collected during the year, including wastewater monitoring if applicable; and
d. All historical monitoring data collected during the previous 5 years, and for which there are detectable results, including data for the previous year, shall be submitted in tabular form and in a digital file format.
e. Monitoring information must include at a minimum:
1) The date, identity of sample, monitoring point from which the sample was collected, and time of sampling or measurement;
2) The name of the individual(s) who performed the sampling or measurements; 3) Date and time that analyses were started and completed; 4) The analytical techniques or method used, including method of preserving the sample and the identity and volume of reagents used; and 5) Field instrument calibration logs.
f. Copy of the complete laboratory analytical report(s), signed by the laboratory director or project manager, and at a minimum contain:
1) Complete sample analytical reports;
2) Complete laboratory QA/QC reports;
3) A discussion of the sample and QA/QC data;
4) A properly completed “chain of custody” from the analyzed samples; and 5) A transmittal letter stating whether or not all of the analytical work was supervised by the director of the laboratory, and contain the following statement:
“All analyses were conducted at a laboratory certified for such analyses by the State Water Board’s Environmental Laboratory Accreditation Program in accordance with current U.S. EPA procedures.”
g. Results and discussion from the annual survey;
h. Results and discussion of the groundwater protection monitoring, if applicable, including statistical analysis as submitted in the NOI and accompanying technical report, and approved by the Regional Water Board;
i. A summary of completion of inspections and maintenance of the working surfaces, berms, ditches, erosion control BMPs or other containment structures; j. An evaluation of completion of inspections and maintenance on the effectiveness of the wastewater handling facilities including results of the annual testing of wastewater, capacity issues, nuisance conditions, and system problems; k. A comprehensive discussion of the compliance record, and the result of any corrective actions taken or planned which may be needed to bring the Discharger into full compliance with this General Order; and
l. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system or reporting program.

B-7
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

2. NOTIFICATION OF VIOLATIONS
If the Discharger determines there has been a violation of the requirements specified in either the General Order or this MRP, the Discharger must notify the Regional Water Board office by telephone or email, within 48 hours, once the Discharger has knowledge of the violation. The notification must include a description of the noncompliance and its cause, the period of noncompliance (dates and times); and if the noncompliance has not been corrected, the anticipated time the noncompliance is expected to continue. The notification must also include steps taken or planned to reduce, eliminate, or prevent recurrence of the noncompliance.

The Regional Water Board may, depending on the severity of the violation, require the Discharger to submit a separate technical report regarding the violation within 10 working days of the initial notification.

3. PRIORITY REPORTING OF SIGNIFICANT EVENTS
The Discharger shall report any noncompliance that endangers human health or the environment within 24 hours of becoming aware of its occurrence. The incident shall be reported to the Regional Water Board, the local environmental health department, and to the California Governor’s Office of Emergency Services (CalOES). During non-business hours, the Discharger shall leave a message on the Regional Water Board’s voice mail.

The message shall include the time, date, place, and nature of the noncompliance, name, and number of the reporting person, and shall be recorded in writing by the Discharger.

CalOES is operational 24 hours a day. A written report shall be submitted to the Regional Water Board office within 10 working days of the Discharger becoming aware of the incident. The report shall contain a description of the noncompliance, causes, duration, and the actual or anticipated time for achieving compliance. The report shall include complete details of steps that the Discharger has taken or intends to take to prevent recurrence. All intentional or accidental spills shall be reported as required by this provision. The written submission shall contain:
a. The approximate date, time, and location of the noncompliance including a description of the ultimate destination of any unauthorized discharge and the flow path of such discharge to a receiving water body;
b. A description of the noncompliance and its cause;
c. The flow rate, volume, and duration of any discharge involved in the noncompliance; d. The amount of precipitation (in inches) the day of any discharge and for each of the seven days preceding the discharge;
e. A description (location, date and time collected, field measurements of pH, temperature, dissolved oxygen and electrical conductivity, sample identification, date submitted to laboratory, and analyses requested) of noncompliance discharge samples and/or surface water samples taken;
f. The period of noncompliance, including dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; B-8
August 4, 2015

ATTACHMENT B – MONITORING AND REPORTING PROGRAM

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS g. A time schedule and a plan to implement corrective actions necessary to prevent the recurrence of such noncompliance; and
h. The laboratory analyses of the noncompliance discharge sample and/or upstream and downstream surface water samples shall be submitted to the Regional Water Board office within 45 days of the discharge.

C. RECORD-KEEPING REQUIREMENTS
The Discharger must retain records of all monitoring information, including all calibration and maintenance records, and copies of all reports required by this MRP, for a minimum of 5 years from the date of sample, measurement, report, or application. This period may be extended during the course of any unresolved litigation regarding the discharge or when requested by the Regional Water Board. Records of monitoring information must include at a minimum:
a. The date, identity of sample, monitoring point from which the sample was collected, and time of sampling or measurement;
b. The name of the individual(s) who performed the sampling or measurements; c. Training logs and records;
d. Date and time that analyses were started and completed; e. The analytical techniques or method used, including method of preserving the sample and the identity and volume of reagents used;
f. Calculation of results;
g. Results of analyses performed and method used (as proposed in an NOI and accompanying technical report, and approved by the Regional Water Board) for calculating the concentration limits for each naturally occurring constituents, based on background water quality monitoring data;
h. Results of analyses and the MDL for each non-naturally occurring constituent; i. Laboratory quality assurance results (e.g., percent recovery, response factor, etc.); and
j. Chain of Custody forms.

Ordered by:________________________
Regional Water Board
Executive Officer
B-9
August 4, 2015

THIS PAGE INTENTIONALLY LEFT BLANK
August 4, 2015

_______________

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT C – NOTICE OF INTENT

DISCHARGER INFORMATION
Owner Name:

Street Address:

City/Locale: County: State: Zip: Telephone Number:

Facsimile Number: Email Address:

Owner Type (check one): □ Individual □ Corporation □ Partnership □ Other:

Operator Name (if different than above):

Mailing Address:

City/Locale: County: State: Zip: Telephone Number:

Facsimile Number: Email Address:

1. COMPOSTING OPERATION INFORMATION
Compost Facility Name:

Street Address:

City/Locale: County: State: Zip: Telephone Number:

Type (check one):
□ Existing Composting Operation
□ New Composting Operation
Facility Acreage (acres):

Total Facility Capacity (cubic yards):

Average Weekly Throughput (cubic yards per week):

Assessor Parcel Number(s): Regional Water Board Office:

Latitude __  ___’ ___” Longitude __  ___’ ___” Regional Water Board Address:

2. REASONS FOR FILING
□ New Discharge □ Existing Discharge □ Expansion or Change in Operations □ Changes in Ownership/Operator □ Other:

3. STORM WATER PERMIT
Is there an Industrial Storm Water Permit for this facility? □ Yes □ No If yes, WDID Number:

Related to storm water, have you received a “No Exposure Certification”, “Notice of Termination”, or “Notice of Exemption” for this facility? □ Yes □ No If yes, please provide a copy.

The Notice of Intent for coverage under the Industrial Storm Water Permit may be obtained over the internet at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/industrial.shtml August 4, 2015 C-1

ATTACHMENT C - NOTICE OF INTENT

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

4. OTHER PERMITS
Has another agency issued permits or other entitlements (e.g., solid waste facility permit, notification permit, conditional use permit, building permits, air permits) for the unit? □ Yes □ No For each permit or entitlement, list the type, issuing agency, and date of issuance:

5. CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
Has a CEQA determination been made by an agency? □ Yes □ No Name of Agency:

Type and Date of Determination: State Clearinghouse Number:

6. PROCESS
Allowable Materials (check all that apply, and specify the quantity onsite at any time):
□ agricultural material cu. yds.: □ anaerobic digestate cu. yds.:
□ biosolids (Class A, B, or cu. yds.: EQ) □ food material (non-vegetative) cu. yds.:
□ green material cu. yds.: □ manure cu. yds.:
□ paper material cu. yds.: □ vegetative food material cu. yds.:
□ residentially co-collected cu. yds.:
food and green material
Current Processing Capacity (cubic yards):

Months during which compostable materials will be on-site:

Additives/Amendments and maximum dry weight percentage used (list):

7. SITE CONDITIONS
Anticipated highest groundwater elevation (feet mean sea level):

Average ground surface material percolation rate (minutes per inch) or attach results of percolation testing:

Annual average precipitation (inches per year):

Distance to nearest water supply well (feet):

Closest surface water and distance (name, feet):

8. DESIGN SPECIFICATION TIERS (check one)
□ Tier I □ Tier II □ Tier II (monitoring)
If the box for Tier II (monitoring) has been marked, provide the proposed Groundwater Protection Monitoring Plan with Technical Report.

August 4, 2015 C-2

ATTACHMENT C - NOTICE OF INTENT

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

9. TECHNICAL REPORT
Provide a complete technical report with all the information required in Attachment D of this General Order.

10. FILING FEE
Pursuant to California Water Code section 13260 et seq., Dischargers enrolled under this General Order are required to pay an annual fee, as determined by the State Water Resources Control Board. The filing fee accompanying this NOI is the first year’s annual fee. The annual fee is based on the threat to water quality and complexity of the discharge in accordance with California Code of Regulations, title 23, section 2200. Dischargers enrolled under this General Order will be assigned a threat to water quality and complexity rating as described in the General Order and will be assessed the corresponding fee, plus any applicable surcharges. The NOI is to be accompanied by a check, made out to the State Water Resources Control Board for the payment of the filing fee.

11. CERTIFICATION
“I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.” Signature (Owner or Authorized Representative) Date
Print Name Title
Telephone Number Email
August 4, 2015 C-3

THIS PAGE INTENTIONALLY LEFT BLANK

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS
The technical report required as part of the Notice of Intent (NOI) to comply with the terms of this General Order must be organized such that each item listed below is addressed in the same format, including the numbering scheme. The entire General Order should be thoroughly reviewed for its requirements prior to preparation of this technical report. The minimum information needed to provide a complete review of your application by the appropriate Regional Water Board is listed below. This list may not reference all information needed for every composting operation.

The Business and Professions Code sections 6735, 7835, and 7835.1 require that engineering and geologic evaluations and judgments be performed by or under the direction of licensed professionals. Any plan or report submitted in compliance with the requirements of this General Order, which requires technical interpretation, or proposes either a design, or a design change that might affect the composting operation’s containment features, detention ponds, or monitoring systems must be prepared by, or under the direction of, appropriately licensed professionals (e.g., registered civil engineer, professional geologist, or other registered certified specialty geologist) by the State of California. In addition, the licensee must sign and provide his or her registration number, and/or stamp the submitted plan or report.

A. GENERAL INFORMATION

1. Property owner’s contact information including business name, main point of contact, address, telephone number, facsimile number, email address, and type of ownership (e.g., individual, corporation, etc.).

2. Operator’s contact information including business name, main point of contact, address, telephone number, facsimile number, and email address.

3. Information including name, address, telephone number, facsimile number, and email address where legal notices may be served (if different than above).

4. Legal business name and location of composting operation. Use the most accurate location, which may include: address; nearest town; cross streets; and latitude and longitude1
.

5. Description of the Facility including:
a. Assessor’s Parcel Number(s);
b. Legal description including Section, Township, and Range; c. Total Operational Footprint (acres) including ancillary activities; d. Permitted Operational Capacity expressed in cubic yards of all materials received, processed, and stored on site at any given time;
1 In accordance with GeoTracker’s Survey XYZ, Well Data, and Site Map Guidelines & Restrictions available at:
http://www.waterboards.ca.gov/ust/electronic_submittal/docs/geotrackersurvey_xyz_4_14_05.pdf D-1
August 4, 2015

ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS e. Land uses within one mile from the perimeter of the operation; and f. Description of water supply.

6. Provide a detailed site map showing the following:
a. Location and size (in acres) of the working surface used for the storage of incoming feedstocks, additives, and amendments (receiving area); b. Location and size (in acres) of the working surface used for active and curing composting;
c. Location and size (in acres) of the working surface used for the storage of final product;
d. Drainage pattern;
e. Berms and ditches for the conveyance of wastewaters; f. Location, size (in acres), and capacity (in acre feet) of all detention ponds, if applicable;
g. Location of all sampling points for the monitoring of wastewater contained within ponds pursuant to the requirements of the General Order, if applicable; h. Location of all sampling points for the monitoring of storm water runoff under the Industrial General Storm Water Permit, if applicable; and i. Location of any groundwater monitoring wells and water supply wells within and/or near the property boundary.

7. Provide background information on the composting operation including history and a description of methods and operation used including the following:
a. Describe the feedstock types, volumes, sources, and suppliers. b. Describe the additives used, sources, suppliers, and the maximum dry weight percentage used in the active composting process.
c. Describe the amendments used, sources and suppliers in the final product. d. Describe the method of composting (e.g., windrow, static, forced air, mechanical). e. Provide process flow diagram showing movement of the material from received to final product. Include average amount of time the material remains in each part of the process.
f. Describe how residuals are removed from the feedstocks managed and/or disposed.

B. SITE CONDITION INFORMATION

1. Climatology — Calculate required climatologic values from measurements made at a nearby climatologically similar station and provide the source data from which such values were calculated, together with the name, location, and period of record of the measuring station.
a. Maximum, minimum, and average annual precipitation in inches/year; b. Mean evaporation in inches/year;
D-2
August 4, 2015

ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS c. 25-year, 24-hour design storm event.

2. Geology:
a. Map and Cross Sections — A comprehensive geologic map and geologic cross sections showing lithology and structural features.
b. Materials — A description of natural geologic materials in and underlying the location of the operations, including identification of lithology, distribution and dimension features, physical characteristics, special physical or chemical features (i.e., alteration other than weathering), susceptibility to natural surface/near-surface processes, and all other pertinent lithologic data, all in accordance with current industry practices.

3. Hydrogeology, including:
a. General – An evaluation of water bearing characteristics of natural geologic materials identified under Geology above, including hydraulic conductivity and delineation of groundwater zones.
b. Hydraulic Conductivity – An evaluation of the in-place hydraulic conductivity of soils immediately under the operation. For Tier I facilities, this would be substituted by the soil percolation test. This evaluation includes:
1) Hydraulic conductivity in tabular form, for selected locations within the boundary of the operations;
2) A map of the operations showing test locations; and
3) An evaluation of the test procedures and rationale used to obtain the data. c. Groundwater Flow Direction and Depth – an evaluation of the groundwater flow velocity and direction(s) within the uppermost groundwater zone and the following conditions:
1) Maximum and average depth to first encountered groundwater below the native ground surface (in feet) and identify the source of the information; and 2) Maximum and average groundwater elevation of first encountered groundwater (in feet) relative to mean sea level.

4. Discuss the location and distance (in feet) to the nearest water supply wells (e.g., municipal supply, domestic supply, agricultural wells) from the nearest property boundary of the operation.

5. Discuss whether the operation is located within a 100-year flood plain based on the Federal Emergency Management Agency’s (FEMA) designation and any design features to prevent inundation of the feedstocks, additives, amendments, compost (active, curing, or final product), or detention ponds. Include a reference to the appropriate FEMA Flood Hazard Map. Operations located within a 100-year floodplain may be subject to state and/or local land use restrictions and permits.

D-3
August 4, 2015

ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

6. Identify all nearby surface water bodies, including streams, ditches, canals, and other drainage courses. Provide distances from the nearest property boundary of the operation to these areas on a map.

C. DESIGN INFORMATION

1. Provide the current and/or proposed design of all working surfaces, berms, and conveyance ditches for the storage and/or treatment of feedstocks, additives, amendments, and compost (active, curing, or final product), along with information demonstrating that these containment structures comply with appropriate design specifications of this General Order. Submit for each operational area detailed preliminary and/or (if existing, or later upon completion) as-built plans, specifications, and descriptions for all working surfaces or other containment structures and drainage/conveyance systems. In addition, the report shall contain a description of, and location data for, ancillary facilities including roads, waste handling areas, detention ponds, buildings, and equipment cleaning facilities.

2. Provide a Water and Wastewater Management Plan describing how water and wastewaters will be managed in accordance with this General Order. Information must include a description of and/or plan illustrating all precipitation controls, containment structures, (i.e., conveyance systems for wastewater and detention ponds), best management practices, and contingency plan including:
a. A wastewater conveyance system for controlling run-on and runoff from the working surface.
b. A description of how water and wastewater is obtained and used in the compost process.
c. A description of how the operation collects and manages wastewater. Information may include, but is not limited to, quantity that is reused back into the process, description of wastewater treatment systems, other water quality permits, and best management practices (i.e. covering materials) that reduce the production of wastewater.
d. If using a detention pond, provide a water balance demonstrating compliance with the Design, Construction and Operation Requirements section of this General Order.

D. OPERATIONS AND MONITORING INFORMATION

1. Include a proposal for an annual survey of the operation prior to the rainy season to assure that the site has been graded and prepared for the rainy season to eliminate and minimize erosion and ponding, in compliance with the requirements of this General Order.

2. Describe the inspection and maintenance program that will be undertaken regularly during composting operations, such as inspection of the containment structures for evidence of leachate, ponding, or surface failures such as cracking, spilling, or subsidence, in compliance with the specifications of this General Order.

D-4
August 4, 2015

ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS

3. Describe the means by which the composting operation will be conducted in a manner that does not cause, threaten to cause, or contribute to conditions of contamination, pollution, or nuisance.

4. Provide a description of the operations during periods of wet weather to ensure integrity of the containment systems.

5. For Dischargers proposing groundwater protection monitoring in lieu of the design specifications, include a Groundwater Protection Monitoring Plan for establishing, operating, and monitoring to verify groundwater has not been impacted by the composting operation. Include rationale for the type of monitoring, monitoring frequency, spatial distribution of monitoring points, selection of monitoring equipment, construction specifications, procedures for sampling, analysis of the data, and data evaluation. This plan must include the following:
a. Map – a map showing the locations of the proposed monitoring system; b. Plans and Specifications – drawings and data showing construction details of the proposed monitoring system.
c. Inspection Procedures – construction quality assurance plan to ensure the system will be constructed per approved plans.
d. Sampling and Analysis – the plan shall include consistent sampling and analytical procedures that are designed to ensure that monitoring results provide a reliable indication of water quality at all monitoring points. At a minimum, the plan shall include a detailed description of the procedures and techniques for:
1) Sample collection (i.e. container types), sampling equipment (i.e. field instruments, pumps, bailers, etc.), equipment calibration, and decontamination of sampling equipment;
2) Sample preservation and shipment;
3) Analytical procedures;
4) Chain of custody control; and
5) QA/QC procedures.
e. Proposed Data Analysis Method – describe the methods that will be used in evaluating protection of water quality. The specifications for each data analysis method shall include a list of constituents of concern that will be monitored and a detailed description of the criteria to be used for determining “measurably significant” evidence of any release from the operation and for determining compliance.

E. SITE CLOSURE INFORMATION
The technical report must include a plan for site closure activities upon completion of operations under this General Order to protect public health, safety, and the environment. The plan must describe how the site will be restored in compliance with the Site Closure Requirements section of this General Order.

D-5
August 4, 2015

ATTACHMENT D – TECHNICAL REPORT REQUIREMENTS

STATE WATER RESOURCES CONTROL BOARD
ORDER WQ 2015-0121-DWQ

GENERAL WASTE DISCHARGE REQUIREMENTS FOR COMPOSTING OPERATIONS F. COMPLIANCE SCHEDULE (EXISTING FACILITIES)
The technical report shall include a proposed schedule for achieving compliance with this General Order. Proposed schedules for implementation of the identified collection, control, and monitoring practices must be as soon as practicable, supported with appropriate technical or economic justification and in no case may the schedule exceed six years from the date of the NOI. The Regional Water Board may modify the schedules based on evidence that meeting the compliance date is technically or economically infeasible.

D-6
August 4, 2015
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX R SIGNIFICANT INDUSTRIAL USERS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN R-1
The following data and worksheet was compiled to corroborate the 0.6 sewer to factor ratio shown in Table 5.7 - Sewer to Water Usage Factors With 2020 Water Consumption Data. This corroboration occurs by comparing sewer to water flows from the metered pipelines to and from each significant industrial user (SIU), and developing a ratio between the two.

There are eight SIUs that the City of Santa Maria (City) tracks for water and sewer flows. However, there are some issues with meters. For example, Mission Linen Company, an SIU, produces a higher sewer flow than what is metered. Further, there are two SIUs that are "zero dischargers" and produce cooling water with zero loading to the sewer. As a result, the three SIUs that do not produce water flows are excluded from the following data.

To account for gaps in data, 2021 through 2023 data has been compiled and averaged.

Table R.1 SIUs Tracked by the City
SIU Average Wastewater Discharge
(gallons)
Average Water Consumption
(gallons)
Sewer to Water Factor
Fess Parker Winery 83,000 331,800 0.25
Fresh Venture Foods 3,280,000 3,620,000 0.91
Titan Frozen Fruits 4,460,000 5,360,000 0.81
Miller Family Wine Company 133,000 308,000 0.44
Okonite 940,000 1,530,000 0.61
Mission Linen Supply(1) 1,880,000 1,485,000 1.28(1)
PictSweet(2) - 265,000 -
SureFresh Produce(3) 4,220,000 - -
Average - - 0.60
Notes:
(1) Provided SIU data indicates that Mission Linen Supply produces more wastewater than it consumes. This may indicate a metering issue. For analysis, the sewer to water factor was not included in the final average. (2) PictSweet does not discharge wastewater.
(3) SureFresh Produce has two processing plants. The values provided are the sum of both.

The value of 0.60 has been used to maintain the proportion of industrial flows in the City's wastewater.

The effect of this is that it serves as a projection of an increased industrial flows as a proportion of the net flow into the plant.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX S PERCOLATION PONDS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN S-1
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX T AACE INTERNATIONAL RECOMMENDED
PRACTICE NO. 18R-97
18R-97

COST ESTIMATE CLASSIFICATION

SYSTEM - AS APPLIED IN

ENGINEERING, PROCUREMENT,

AND CONSTRUCTION FOR THE

PROCESS INDUSTRIES
SAMPLE
Copyright © AACE®
International AACE®International Recommended Practices
Single user license only. Copying and networking prohibited.

This document is copyrighted by AACE International and may not be reproduced without permission. Organizations may obtain permission to reproduce a limited number of copies by entering into a license agreement. For information please contact [email protected] AACE International Recommended Practice No. 18R-97
COST ESTIMATE CLASSIFICATION SYSTEM –

AS APPLIED IN ENGINEERING, PROCUREMENT, AND

CONSTRUCTION FOR THE PROCESS INDUSTRIES
TCM Framework: 7.3 – Cost Estimating and Budgeting
Rev. March 6, 2019
Note: As AACE International Recommended Practices evolve over time, please refer to web.aacei.org for the latest revisions.

Any terms found in AACE Recommended Practice 10S-90, Cost Engineering Terminology, supersede terms defined in other AACE work products, including but not limited to, other recommended practices, the Total Cost Management Framework, and Skills & Knowledge of Cost Engineering.

Contributors:

Disclaimer: The content provided by the contributors to this recommended practice is their own and does not necessarily reflect that of their employers, unless otherwise stated.

March 6, 2019 Revision:

Peter R. Bredehoeft, Jr. CEP FAACE (Primary Contributor) Larry R. Dysert, CCP CEP DRMP FAACE Hon. Life
(Primary Contributor)
John K. Hollmann, CCP CEP DRMP FAACE Hon. Life
(Primary Contributor)
March 1, 2016 Revision:

Larry R. Dysert, CCP CEP DRMP
(Primary Contributor)
Laurie S. Bowman, CCP DRMP EVP PSP
Peter R. Bredehoeft, Jr. CEP
Dan Melamed, CCP EVP
Todd W. Pickett, CCP CEP
Richard C. Plumery, EVP
November 29, 2011 Revision:

Peter Christensen, CCE (Primary Contributor)
Larry R. Dysert, CCC CEP (Primary Contributor)
Jennifer Bates, CCE
Jeffery J. Borowicz, CCE CEP PSP
Peter R. Bredehoeft, Jr. CEP
Robert B. Brown, PE
Dorothy J. Burton
Robert C. Creese, PE CCE
John K. Hollmann, PE CCE CEP
Kenneth K. Humphreys, PE CCE
Donald F. McDonald, Jr. PE CCE PSP
C. Arthur Miller
Todd W. Pickett, CCC CEP
Bernard A. Pietlock, CCC CEP
Wesley R. Querns, CCE
Don L. Short, II CEP
H. Lance Stephenson, CCC
James D. Whiteside, II PE
SAMPLE
AACE®
International Recommended Practice No. 18R-97
COST ESTIMATE CLASSIFICATION SYSTEM – AS

APPLIED IN ENGINEERING, PROCUREMENT, AND

CONSTRUCTION FOR THE PROCESS INDUSTRIES
TCM Framework: 7.3 – Cost Estimating and Budgeting
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.

TABLE OF CONTENTS
Table of Contents ..........................................................................................................................................................1 Purpose..........................................................................................................................................................................1 Introduction...................................................................................................................................................................2 Cost Estimate Classification Matrix for the Process Industries .....................................................................................2 Determination of the Cost Estimate Class.....................................................................................................................5 Characteristics of the Estimate Classes .........................................................................................................................6 Estimate Input Checklist and Maturity Matrix.............................................................................................................12 Basis of Estimate Documentation................................................................................................................................14 Project Definition Rating System.................................................................................................................................14 References...................................................................................................................................................................14 Contributors.................................................................................................................................................................15

PURPOSE
As a recommended practice (RP) of AACE International, the Cost Estimate Classification System provides guidelines for applying the general principles of estimate classification to project cost estimates (i.e., cost estimates that are used to evaluate, approve, and/or fund projects). The Cost Estimate Classification System maps the phases and stages of project cost estimating together with a generic project scope definition maturity and quality matrix, which can be applied across a wide variety of industries and scope content.

This recommended practice provides guidelines for applying the principles of estimate classification specifically to project estimates for engineering, procurement, and construction (EPC) work for the process industries. It supplements the generic cost estimate classification RP 17R-97[1] by providing:
• A section that further defines classification concepts as they apply to the process industries. • A chart that maps the extent and maturity of estimate input information (project definition deliverables) against the class of estimate.

As with the generic RP, the intent of this document is to improve communications among all the stakeholders involved with preparing, evaluating, and using project cost estimates specifically for the process industries.

The overall purpose of this recommended practice is to provide the process industry with a project definition deliverable maturity matrix that is not provided in 17R-97. It also provides an approximate representation of the relationship of specific design input data and design deliverable maturity to the estimate accuracy and methodology used to produce the cost estimate. The estimate accuracy range is driven by many other variables and risks, so the maturity and quality of the scope definition available at the time of the estimate is not the sole determinate of accuracy; risk analysis is required for that purpose.

This document is intended to provide a guideline, not a standard. It is understood that each enterprise may have its own project and estimating processes, terminology, and may classify estimates in other ways. This guideline SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
2 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited. provides a generic and generally acceptable classification system for the process industries that can be used as a basis to compare against. This recommended practice should allow each user to better assess, define, and communicate their own processes and standards in the light of generally-accepted cost engineering practice.

INTRODUCTION
For the purposes of this document, the term process industries is assumed to include firms involved with the manufacturing and production of chemicals, petrochemicals, and hydrocarbon processing. The common thread among these industries (for the purpose of estimate classification) is their reliance on process flow diagrams (PFDs), piping and instrument diagrams (P&IDs), and electrical one-line drawings as primary scope defining documents. These documents are key deliverables in determining the degree of project definition, and thus the extent and maturity of estimate input information. This RP applies to a variety of project delivery methods such as traditional design-bid-build (DBB), design-build (DB), construction management for fee (CM-fee), construction management at risk (CM-at risk), and private-public partnerships (PPP) contracting methods.

Estimates for process facilities center on mechanical and chemical process equipment, and they have significant amounts of piping, instrumentation, and process controls involved. As such, this recommended practice may apply to portions of other industries, such as pharmaceutical, utility, water treatment, metallurgical, converting, and similar industries.

Most plants also have significant electrical power equipment (e.g., transformers, switchgear, etc.) associated with them. As such, this RP also applies to electrical substation projects, either associated with the process plant, as part of power transmission or distribution infrastructure, or supporting the power needs of other facilities. This RP excludes power generating facilities and high-voltage transmission.

This RP specifically does not address cost estimate classification in non-process industries such as commercial building construction, environmental remediation, transportation infrastructure, hydropower, “dry” processes such as assembly and manufacturing, “soft asset” production such as software development, and similar industries. It also does not specifically address estimates for the exploration, production, or transportation of mining or hydrocarbon materials, although it may apply to some of the intermediate processing steps in these systems.

The cost estimates covered by this RP are for engineering, procurement, and construction (EPC) work only. It does not cover estimates for the products manufactured by the process facilities, or for research and development work in support of the process industries. This guideline does not cover the significant building construction that may be a part of process plants.

This guideline reflects generally-accepted cost engineering practices. This recommended practice was based upon the practices of a wide range of companies in the process industries from around the world, as well as published references and standards. Company and public standards were solicited and reviewed, and the practices were found to have significant commonalities. [4,5,6,7] These classifications are also supported by empirical process industry research of systemic risks and their correlation with cost growth and schedule slip [8].

COST ESTIMATE CLASSIFICATION MATRIX FOR THE PROCESS INDUSTRIES A purpose of cost estimate classification is to align the estimating process with project stage-gate scope development and decision-making processes.

SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
3 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.

Table 1 provides a summary of the characteristics of the five estimate classes. The maturity level of project definition is the sole determining (i.e., primary) characteristic of class. In Table 1, the maturity is roughly indicated by a percentage of complete definition; however, it is the maturity of the defining deliverables that is the determinant, not the percent. The specific deliverables, and their maturity or status are provided in Table 3. The other characteristics are secondary and are generally correlated with the maturity level of project definition deliverables, as discussed in the generic RP [1]. The post sanction classes (Class 1 and 2) are only indirectly covered where new funding is indicated. Again, the characteristics are typical but may vary depending on the circumstances.

Primary Characteristic Secondary Characteristic

ESTIMATE
CLASS

MATURITY LEVEL OF

PROJECT DEFINITION

DELIVERABLES
Expressed as % of complete
definition

END USAGE
Typical purpose of
estimate

METHODOLOGY
Typical estimating method

EXPECTED ACCURACY
RANGE
Typical variation in low and high
ranges at an 80% confidence
interval
Class 5 0% to 2% Concept
screening
Capacity factored,
parametric models,
judgment, or analogy
L: -20% to -50%
H: +30% to +100%
Class 4 1% to 15% Study or
feasibility
Equipment factored or
parametric models
L: -15% to -30%
H: +20% to +50%
Class 3 10% to 40%
Budget
authorization or
control
Semi-detailed unit costs
with assembly level line
items
L: -10% to -20%
H: +10% to +30%
Class 2 30% to 75% Control or
bid/tender
Detailed unit cost with
forced detailed take-off
L: -5% to -15%
H: +5% to +20%
Class 1 65% to 100% Check estimate
or bid/tender
Detailed unit cost with
detailed take-off
L: -3% to -10%
H: +3% to +15%
Table 1 – Cost Estimate Classification Matrix for Process Industries This matrix and guideline outline an estimate classification system that is specific to the process industries. Refer to Recommended Practice 17R-97 [1] for a general matrix that is non-industry specific, or to other cost estimate classification RPs for guidelines that will provide more detailed information for application in other specific industries. These will provide additional information, particularly the Estimate Input Checklist and Maturity Matrix which determines the class in those industries. See Professional Guidance Document 01, Guide to Cost Estimate Classification. [16]
Table 1 illustrates typical ranges of accuracy ranges that are associated with the process industries. The +/- value represents typical percentage variation at an 80% confidence interval of actual costs from the cost estimate after application of appropriate contingency (typically to achieve a 50% probability of project cost overrun versus underrun) for given scope. Depending on the technical and project deliverables (and other variables) and risks associated with each estimate, the accuracy range for any particular estimate is expected to fall into the ranges identified. However, this does not preclude a specific actual project result from falling outside of the indicated range of ranges identified in Table 1. In fact, research indicates that for weak project systems and complex or otherwise risky projects, the high ranges may be two to three times the high range indicated in Table 1. [17] In addition to the degree of project definition, estimate accuracy is also driven by other systemic risks such as:
• Level of familiarity with technology.
• Unique/remote nature of project locations and conditions and the availability of reference data for those.

SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
4 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited. • Complexity of the project and its execution.
• Quality of reference cost estimating data.
• Quality of assumptions used in preparing the estimate. • Experience and skill level of the estimator.
• Estimating techniques employed.
• Time and level of effort budgeted to prepare the estimate. • Market and pricing conditions.
• Currency exchange.
• The accuracy of the composition of the input and output process streams.

Systemic risks such as these are often the primary driver of accuracy, especially during the early stages of project definition. As project definition progresses, project‐specific risks (e.g. risk events and conditions) become more prevalent and also drive the accuracy range. Another concern in estimates is potential organizational pressure for a predetermined value that may result in a biased estimate. The goal should be to have an unbiased and objective estimate both for the base cost and for contingency. The stated estimate ranges are dependent on this premise and a realistic view of the project. Failure to appropriately address systemic risks (e.g. technical complexity) during the risk analysis process, impacts the resulting probability distribution of the estimated costs, and therefore the interpretation of estimate accuracy.

Figure 1 illustrates the general relationship trend between estimate accuracy and the estimate classes (corresponding with the maturity level of project definition). Depending upon the technical complexity of the project, the availability of appropriate cost reference information, the degree of project definition, and the inclusion of appropriate contingency determination, a typical Class 5 estimate for a process industry project may have an accuracy range as broad as -50% to +100%, or as narrow as -20% to +30%. However, note that this is dependent upon the contingency included in the estimate appropriately quantifying the uncertainty and risks associated with the cost estimate. Refer to Table 1 for the accuracy ranges conceptually illustrated in Figure 1. [18] Figure 1 also illustrates that the estimating accuracy ranges overlap the estimate classes. There are cases where a Class 5 estimate for a particular project may be as accurate as a Class 3 estimate for a different project. For example, similar accuracy ranges may occur if the Class 5 estimate of one project that is based on a repeat project with good cost history and data and, whereas the Class 3 estimate for another is for a project involving new technology. It is for this reason that Table 1 provides ranges of accuracy values. This allows consideration of the specific circumstances inherent in a project and an industry sector to provide realistic estimate class accuracy range percentages. While a target range may be expected for a particular estimate, the accuracy range should always be determined through risk analysis of the specific project and should never be pre-determined. AACE has recommended practices that address contingency determination and risk analysis methods. [19] If contingency has been addressed appropriately approximately 80% of projects should fall within the ranges shown in Figure 1. However, this does not preclude a specific actual project result from falling inside or outside of the indicated range of ranges identified in Table 1. As previously mentioned, research indicates that for weak project systems, and/or complex or otherwise risky projects, the high ranges may be two to three times the high range indicated in Table 1.

SAMPLE
18R-97: Cost Estimate Classification System – As Applied in Engineering, Procurement, and Construction for the Process Industries
5 of 16
March 6, 2019
Copyright © AACE®International AACE®International Recommended Practices Single user license only. Copying and networking prohibited.

Figure 1 – Illustration of the Variability in Accuracy Ranges for Process Industry Estimates

DETERMINATION OF THE COST ESTIMATE CLASS
For a given project, the determination of the estimate class is based upon the maturity level of project definition based on the status of specific key planning and design deliverables. The percent design completion may be correlated with the status, but the percentage should not be used as the class determinate. While the determination of the status (and hence the estimate class) is somewhat subjective, having standards for the design input data, completeness and quality of the design deliverables will serve to make the determination more objective.

SAMPLE

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 3: Wastewater Characterization
and Process Modeling
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 3: Wastewater Characterization
and Process Modeling
FINAL / October 2026
Digitally signed by Andre Gharagozian
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.27 10:09:04-07'00'
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 3/Ch01 Contents
CHAPTER 1 WASTEWATER CHARACTERIZATION AND PROCESS

MODELING

1.1 Purpose and Key Findings 1-1

1.2 Flow and Load Summary 1-2

1.3 Existing Facilities Description 1-9

1.4 Performance and Capacity Evaluation 1-11

1.4.1 Permit Limits 1-11

1.4.2 Historical Performance 1-13

1.4.3 Effluent Nitrogen 1-14

1.4.4 Wastewater Sampling and Characterization 1-15

1.4.5 Unit Process Evaluation 1-18

1.5 Process Modeling - Existing Facilities 1-32

1.6 Capacity Evaluation 1-37
Appendices
APPENDIX A TM 1: EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR

NEAR-TERM EFFLUENT QUALITY IMPROVEMENT

APPENDIX B SUPPLEMENTAL SAMPLING PLAN
Tables
Table 1.1 Historical Influent Flow and Peaking Factor Data 1-2 Table 1.2 Historical Influent Concentrations(1) 1-4
Table 1.3 Historical Influent Loadings 1-4
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) 1-11 Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 1-12
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 1-12
Table 1.7 Summary of Historical Performance Through December 2024 1-13 Table 1.8 Summary of Wastewater Sampling Plan Data 1-17 Table 1.9 Unit Process Performance 1-19
Table 1.10 Process Model Calibration Parameters 1-34
Table 1.11 Process Model Calibration Summary 1-35
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Figures
Figure 1.1 Historical Influent Flow 1-3
Figure 1.2 Historical Influent CBOD and BOD5 Concentrations 1-5 Figure 1.3 Historical Influent TSS Concentrations 1-6
Figure 1.4 Historical Influent CBOD and BOD5 Loadings 1-7 Figure 1.5 Historical Influent TSS Loadings 1-8
Figure 1.6 Historical Influent TKN and NH3-N Concentrations 1-8 Figure 1.7 Process Flow Diagram 1-10
Figure 1.8 Effluent TSS and CBOD 1-14
Figure 1.9 Effluent Ammonia, Nitrate, and Nitrite 1-15
Figure 1.10 SORs for Primary Clarifiers 1-23
Figure 1.11 Thickened Sludge Flow Rate 1-26
Figure 1.12 Thickened Sludge TS Concentration 1-26
Figure 1.13 Anaerobic Digester Hydraulic Retention Time 1-27 Figure 1.14 Anaerobic Digester VS Loading Rate 1-28
Figure 1.15 Anaerobic Digester pH 1-29
Figure 1.16 Anaerobic Digester Volatile Acids 1-29
Figure 1.17 Anaerobic Digester Alkalinity 1-30
Figure 1.18 Anaerobic Digester Gas Production 1-30
Figure 1.19 Anaerobic Digester Temperature 1-31
Figure 1.20 Anaerobic Digester VS Reduction 1-31
Figure 1.21 Anaerobic Digester Volatile Acids/Alkalinity Ratio 1-32 Figure 1.22 Process Model for City's WWTP 1-33
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AA annual average
BOD5 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
Carollo Carollo Engineers
CBOD carbonaceous biochemical oxygen demand
City City of Santa Maria
COD chemical oxygen demand
ft2 square feet
ft3 cubic feet
gpd gallons per day
gpm gallons per minute
HRT hydraulic residence time
klb thousand pounds
lb pound
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
MM maximum month
mm millimeter
NH3-N ammonia
NO2-N nitrite
NO3-N nitrate
NOA Notice of Applicability
O&M operations and maintenance
PH peak hour
PTFPS primary trickling filter pump station
PTF primary trickling filter
RWQCB Regional Water Quality Control Board
SK Spulkraft
SOR surface overflow rate
STFPS secondary trickling filter pump station
STFs secondary trickling filters
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TM technical memorandum
TN total nitrogen
TS total solids
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
TSCP Time Schedule Compliance Plan
TSS total suspended solids
VS volatile solids
VSS volatile suspended solids
WDR waste discharge requirements
WWTP wastewater treatment plant
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 WASTEWATER CHARACTERIZATION AND

PROCESS MODELING

1.1 Purpose and Key Findings
The purpose of this chapter is to summarize the wastewater characterization sampling event performed at the City of Santa Maria's (City's) Wastewater Treatment Plant (WWTP) and process modeling for the existing facilities. The wastewater characterization sampling event was recommended by Carollo Engineers to supplement the routinely collected operating data and help calibrate the process model, which was leveraged to evaluate current WWTP's performance, establish unit process capacity, and develop near term recommendations for improving plant performance. These recommendations were summarized in draft Technical Memorandum (TM) 1, which is included in Appendix A for reference. This chapter builds on the contents of TM 1 and also provides a review of historical wastewater influent and performance data. Findings from this chapter will also be used to help evaluate alternatives for future facilities to meet the new General Permit and anticipated future effluent quality discharge limits.

Key findings from wastewater characterization, historical performance, and capacity evaluation include:
 The influent carbonaceous biochemical oxygen demand (CBOD), total suspended solids (TSS), total Kjeldahl nitrogen (TKN), and ammonia (NH3-N) concentrations during the sampling event were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling event. » The influent samples were collected as flow-based composites during the sampling event; however, historically, the influent samples have been collected as time-based composites.  The TSS concentrations in solids streams such as thickener underflow, digested sludge, and solids off hauled were also lower than the average historical data. This could again possibly be due to the lower incoming loads into the WWTP during the sampling event.  The average influent chemical oxygen demand (COD) to 5-day biochemical oxygen demand test (BOD5) ratio is about 2.6, which is higher than the typical range of 1.8 to 2.2 for municipal wastewater.

The average particulate COD to volatile suspended solids (VSS) is about 2.0 which is high end of the typical range of 1.4 to 2.0. These higher than typical ratios suggest the presence of industrial waste streams or other non-municipal components in the influent.  The primary treatment performance including primary clarifiers and primary trickling filters (PTFs) is well within the typical range for the current loading.
 The secondary trickling filters (STFs) are performing below the typical range based on the current organic loading.
 The solids handling treatment system including digesters, gravity thickeners, and sludge drying beds are performing well within the typical range.
 The CBOD and TSS loadings are close to the design average conditions, implying that the secondary treatment process is at capacity.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2

1.2 Flow and Load Summary
Table 1.1 summarizes the historical influent flow data for the City's WWTP including annual average (AA), maximum month (MM), and peak hour (PH) flows from January 2018 through December 2024. The "design" values in the right-hand column show the design criteria taken from the most recent 2008 plant expansion project. Although the plant AA flow over the past seven years is 7.1 million gallons per day (mgd) compared with the design flow of 12.5 mgd, the organic loading rates (discussed later) are relatively high. Note that the influent flowmeter was recalibrated in September 2023, which accounts for the change in the AA and MM flow values between 2023 and 2024 shown in Table 1.1. More details are provided in Volume 7, Chapter 2.

Table 1.1 Historical Influent Flow and Peaking Factor Data Flow 2018 2019 2020 2021 2022 2023 2024 Average Design
AA, mgd 7.4 6.8 7.3 7.0 7.3 7.7(1) 6.6 7.1 12.5
MM, mgd 8.5 7.3 7.9 7.5 8.0 8.6(1) 6.9 7.8 13.5
MM Peaking Factor (i.e., MM/AA Flow) 1.15 1.07 1.08 1.07 1.10 1.08 1.05 1.10 1.08 PH, mgd -- 12.9 18.2 12.6 13.3 17.1 -- 14.8(2) 24
PH Peaking Factor (i.e., PH/AA Flow) -- 1.90 2.49 1.80 1.82 2.23 -- 2.05(2) 1.9 Notes:
(1) Influent flowmeter recalibrated in September 2023.
(2) Average data from 2019 through 2023 only.

Figure 1.1 shows the average influent flow to the WWTP for the evaluation period. The solid black line represents the 30-day running average, which can be compared to the design MM flow. As seen in Figure 1.1, the average influent flow since 2018 has been fluctuating between 6 to 8.5 mgd and showed a slight increasing trend between 2020 and 2023, and then a decreasing trend over the last couple of years.

In general, influent flows are less than the design capacity, and MM and PH peaking factors are close to the original design basis.

The City regularly collects and analyzes 24-hour time-based (sampled every 20 minutes) composite samples of their influent just downstream of the bar screens. The CBOD and TSS were sampled biweekly, while influent nitrogen species are measured quarterly. Table 1.2 presents the historical concentration data, and Table 1.3 summarizes the average and MM historical loads of key constituents such as CBOD, TSS, TKN, and NH3-N. The MM concentrations are calculated using MM loads and AA flow.

As shown in Table 1.2, the average annual CBOD over the last six years was 405 milligrams per liter (mg/L).

The CBOD test includes the use of a nitrifier inhibitor, which is known to also inhibit heterotrophic organisms that exert carbonaceous demands. The sampling event showed the average CBOD/BOD5 ratio was 0.83, which means the average annual CBOD corresponds to a BOD5 concentration of around 498 mg/L. The calculated AA BOD5 concentration is 57 percent higher than the design value of 317 mg/L.

Historically, the City has tested for CBOD; however, starting October 2023, City switched to testing and reporting BOD5. The average BOD5 concentration from October 2023 to December 2024 was about 491 mg/L which is 55 percent higher than the design value of 317 mg/L. So, although the current average influent flows are only about 64 percent of the design value, the influent BOD5 load is about 83 percent of the design value. Similarly, for TSS, the influent loads are currently more than 70 percent of the design value.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
The NH3-N and TKN values are close to the higher end of the typical range for domestic wastewater. The typical range for TKN is 40 to 80 mg/L.

Figure 1.1 Historical Influent Flow
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Table 1.2 Historical Influent Concentrations(1)
Constituent 2018 2019 2020 2021 2022 2023 2024 Average Design CBOD
AA, mg/L 410 411 413 380 407 412(2) -- 405 263(4)
MM(3), mg/L 469 453 527 450 496 521(2) -- 486 287(4)
BOD
AA, mg/L -- -- -- -- -- 504(5) 478 491 317
MM(3), mg/L -- -- -- -- -- --(6) 670 670 346
TSS
AA, mg/L 395 417 377 401 374 391 414 396 323
MM(3), mg/L 474 464 501 457 425 513 507 472 382
TKN
AA, mg/L 72 75 75 67 71 66 80 73 --
NH3-N
AA, mg/L 47 51 50 52 45 46 51 49 --
Notes:
(1) Samples analyzed once per week for CBOD and TSS, and quarterly for TKN and NH3-N. (2) Includes data through September only, City switched to testing for BOD5 starting October 2023. (3) Back calculated using MM loading and average flows. (4) Calculated using the BOD5 design values and an assumed CBOD to BOD5 ratio of 0.83. (5) Includes data from October through December only.
(6) Not enough data to calculate MM concentration.

Table 1.3 Historical Influent Loadings
Constituent 2018 2019 2020 2021 2022 2023 2024 Average Design CBOD
AA, klb/day 25.6 23.0 25.4 22.2 24.9 27.1(1) -- 24.7 27.4(2) MM, klb/day 28.9 25.7 32.1 26.1 30.2 33.4(1) -- 30.1 32.4(2) MM Peaking Factor (MM/AA) 1.13 1.15 1.26 1.18 1.21 1.36 -- 1.22 1.18(3) BOD
AA, klb/day -- -- -- -- -- 28.0(4) 27.0 27.5 33.0
MM, klb/day -- -- -- -- -- --(5) 37.0 37.0 39.0
MM Peaking Factor (MM/AA) -- -- -- -- -- --(5) 1.37 1.37 1.18 TSS
AA, klb/day 24.7 23.4 23.1 23.4 22.8 24.9 23.1 23.6 33.6 MM, klb/day 29.2 26.3 30.5 26.5 25.9 32.9 27.9 28.5 42.8 MM Peaking Factor (MM/AA) 1.33 1.12 1.32 1.13 1.16 1.30 1.21 1.22 1.27 Notes:
klb - thousand pounds
(1) Includes data through September only, City switched to sampling BOD5 starting October 2023. (2) Calculated using the BOD5 design values and an assumed CBOD to BOD5 ratio of 0.83. (3) Assumed same design MM peaking factor as of BOD5.
(4) Included data from October through December only.
(5) Not enough data to calculate MM loadings and peaking factor.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Figure 1.2 shows the historical average CBOD and BOD5 concentrations, and Figure 1.3 shows the TSS concentrations for the evaluation period. As seen in Figures 1.2 and 1.3, average CBOD and TSS concentrations have remained consistently in the range of 380 to 410 mg/L during the review period, which is significantly higher than the original design values. As mentioned earlier, City switched from testing for CBOD to BOD5 starting October 2023, which can be seen in Figure 1.2.

Figure 1.2 Historical Influent CBOD and BOD5 Concentrations VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.3 Historical Influent TSS Concentrations
Figure 1.4 shows the historical average CBOD and BOD5 loadings, and Figure 1.5 shows the historical average TSS loadings at the WWTP. Although the TSS and CBOD concentrations are higher than the original design values, influent loads are still less than the design since the average influent flows are only 60 percent of the original design rating of 12.5 mgd AA flow. Both TSS and CBOD loadings have varied slightly during the review period, but the average over the period has generally been fairly constant.

Figure 1.6 shows the historical average TKN and NH3-N concentrations for the evaluation period. Average TKN and NH3-N concentrations have remained fairly consistent for the evaluation period.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Figure 1.4 Historical Influent CBOD and BOD5 Loadings
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.5 Historical Influent TSS Loadings
Figure 1.6 Historical Influent TKN and NH3-N Concentrations VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9

1.3 Existing Facilities Description
The City's WWTP is located at 601 Black Road, Santa Maria, California 93458. The WWTP is a two-stage trickling filter plant and is designed to treat 12.5 mgd of AA flow. The existing facilities description is primarily generated from the WWTP's operations and maintenance (O&M) manual.

The influent wastewater flow is measured with a Parshall flume. The wastewater is then screened through a 0.5-inch bar screen to remove rags, sticks, and large objects that can clog pumps or damage equipment.

The screened wastewater then flows to two parallel aerated grit chambers to remove sand and grit, followed by primary clarification. At the influent end of the grit chambers, plant recycle streams (digested solids decant from the drying beds, and underflow from the secondary clarifiers and the intermediate clarifier) blend with the raw influent flow before entering the grit chambers. Immediately downstream of the grit chambers, recycle from the two PTFs mixes with the flow leaving the grit chambers. This combined stream then splits and flows to the two primary clarifiers.

The primary effluent further flows through the two-stage trickling filters including PTFs and STFs. The PTF stage includes two trickling filters with plastic media that operate in parallel. One PTF is followed by an intermediate clarifier that separates some of the solids to reduce the load on the STF system. A portion of the effluent from the PTFs is recirculated back through the primary clarifiers, as mentioned. The secondary stage includes two cross-flow, plastic media STFs that operate in parallel. The trickling filter effluent flows through the secondary clarifiers and a portion of the effluent is recirculated back to the secondary trickling filter pump station (STFPS) and the remainder is discharged to the percolation ponds.

There are a total of 15 percolation ponds of various sizes, with a total pond area of approximately 82 acres. The ponds have various percolation rates and receive flow based on which are in operation at any given time. Flow cycles between operating ponds. There are typically three or four ponds in drying mode preparing for discing and or regrading.

Settled sludge and scum from the primary clarifiers are pumped to the gravity thickeners and the thickened sludge is then pumped to the digesters. Sludge removed from the intermediate clarifier and secondary clarifiers is pumped back to the grit chambers, and ultimately removed in the primary clarifiers.

The digesters provide an anaerobic environment for the digestion of organic material. Digested sludge is dewatered in sludge drying beds where it can take several weeks or months to dry. Clear liquid, or supernatant from the beds is decanted back to the supernatant pit pump and then to the grit chambers.

Once the sludge is dried, it is removed from the sludge drying beds and trucked to a local composting facility operated by Engel and Gray. Figure 1.7 shows the process flow diagram for the City's WWTP as well as the estimated flow rates for the major process streams. Flow rates were developed based on the reported flows for the influent and thickened sludge and the design flows for the major pump stations.

This information was incorporated into a preliminary process model of the WWTP, which was used to perform a flow balance of the WWTP and estimate recycle streams. The model was developed using EnviroSim's commercially available software package, BioWin version 6.2.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Figure 1.7 Process Flow Diagram
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11

1.4 Performance and Capacity Evaluation
Data from January 2018 to September 2023 was collected and analyzed to evaluate the WWTP's performance. In addition to monitoring influent data, the routine sampling includes the following constituents at the noted frequencies below:
 Effluent:
» CBOD and TSS are sampled weekly.
» NH3-N, nitrate (NO3-N), nitrite (NO2-N), TKN, and total nitrogen (TN) are sampled quarterly. » Boron, chloride, sodium, total dissolved solids (TDS), sulfate, pH, and settleable solids are sampled quarterly.
 Raw sludge:
» TSS and VSS are sampled weekly.
 Digested sludge:
» TSS, VSS, alkalinity, volatile acids, methane production, hydrogen sulfide, temperature, and pH are sampled weekly.
 Solids hauled from the drying beds for disposal at the composting operation (wet tons).

1.4.1 Permit Limits
Please refer to Volume 2 of the Master Plan for a more detailed discussion of permitting for the City's WWTP. Until June 2023, the City was operating the treatment plant under Waste Discharge Requirement (WDR) Order No. R3-2010-000 issued by the Central Coast Regional Water Quality Control Board (RWQCB/Water Board). The 2011 treatment plant expansion allowed the City to comply with WDR Order No. R3-2010-000, the limits of which are shown in Table 1.4.

Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) Constituent Monthly Average Daily Maximum
BOD5, mg/L(1) 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(2), mg/L 1,000 --
Sodium(2), mg/L 180 --
Chloride(2), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
mL/L - milliliters per liter
(1) Although the permit states BOD5, the City had reported CBOD through September 2023. (2) Compliance shall be based on a 3-year running mean.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
In June 2023, the City received a Notice of Applicability (NOA) from the RWQCB for enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements, for discharges from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd). The NOA terminated Order No. R3-2010-000. The City has been granted Interim Effluent Limits for two years, which are shown in Table 1.5. These are the same as those shown in Table 1.3. Since September 2023, the City has been monitoring BOD5 and will no longer monitor for CBOD.

After June 16, 2025, the limits in Table 1.6 will apply. The City submitted a Time Schedule Compliance Plan (TSCP) in June 2024, which requested that the interim limits be extended until such time as the City is able to implement an upgraded treatment facility to address the TN limit. The TSCP also sets certain project milestones that the City needs to comply with, including working towards a solution to meet the Interim BOD5 limit of 60 mg/L. A copy of the TSCP is included in Volume 2 Appendix J of this Master Plan.

Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 Constituent Monthly Average Daily Maximum
BOD5, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
TDS(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
(1) Compliance shall be based on a 3-year running mean.

Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 Constituent 30-day Average 7-day Average Sample Maximum 25-month Rolling Median(1)
BOD5, mg/L 30 45 Not Applicable -
TSS, mg/L 30 45 Not Applicable -
Settleable Solids, mL/L 0.1 0.3 0.5 -
pH between 6.5 to 8.4 Not Applicable Not Applicable -
TDS, mg/L - - - 1,000
Chloride, mg/L - - - 165
Sodium, mg/L - - - 105
Sulfate, mg/L - - - 500
Boron, mg/L - - - 0.5
TN, mg/L - - - 10
Notes:
(1) Based on the Upper Guadalupe Groundwater Basin. Rolling Median is the median from all data collected over the most recent 25 months.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13

1.4.2 Historical Performance
Table 1.7 provides a summary of the historical WWTP performance relative to the previous Order No. R3-2010-000 for TSS and the reported CBOD concentrations. As can be seen, the WWTP was able to treat the influent flow and remain within the CBOD and TSS monthly average limit; however, there was one exceedance for TSS in 2019 based on the daily maximum limit. The monthly average concentrations for CBOD have increased over the last few years and the City has come close to exceeding the monthly limit in 2023. The cause for the increase is not known. The monthly average concentrations for TSS have remained consistent since 2020. The data for 2024 includes BOD5 and TSS values. As shown, the plant exceeded the BOD5 limit in 2024. Figure 1.8 presents the same information compared with monthly average and daily maximum limits for both CBOD and TSS concentrations.

Table 1.7 Summary of Historical Performance Through December 2024 Constituent Effluent Limit 2018 2019 2020 2021 2022 2023 2024 CBOD, mg/L Monthly Maximum 60(2) 48.1 54.4 53.8 58.8 51.9 59.6(1) -- Daily Maximum 100(2) 63.3 72.6 57.7 88.0 59.0 79.0(1) -- BOD, mg/L(3) Monthly Maximum 60 -- -- -- -- -- -- 90.3
Daily Maximum 100 -- -- -- -- -- -- 111.0
TSS, mg/L(3) Monthly Maximum 60 49.5 59.0 45.2 48.8 44.4 57.6 42.8 Daily Maximum 100 73.0 118.0 60.4 70.2 49.2 84.8 55.0
Notes:
(1) Includes data through September only.
(2) Permit was for BOD5 limit.
(3) Interim limits for the new order.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Figure 1.8 Effluent TSS and CBOD

1.4.3 Effluent Nitrogen
The City's WWTP is a non-nitrifying two-stage trickling filter plant, therefore, nitrogen removal was not the original design intent, however it is required as part of the new General Order - see earlier discussion on TSCP. Nevertheless, removal of nitrogen to achieve the new limit of 10 milligrams TN per liter as TN will be required within the next 10 years. Therefore, it is important to assess the nitrogen constituents in the effluent.

Figure 1.9 shows the effluent NH3-N, NO3-N, and NO2-N concentrations. The average NH3-N is about 30 mg/L, NO3-N is about 4.0 mg/L, and NO2-N is about 2.0 mg/L. As seen in Figure 1.9 the higher NO3-N concentrations suggest some incidental nitrification may be occurring in the process.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
Figure 1.9 Effluent Ammonia, Nitrate, and Nitrite

1.4.4 Wastewater Sampling and Characterization
A wastewater sampling plan was developed to supplement the routinely collected data and gather additional data to for better characterization of the influent stream and the various process streams. The results from this effort were also used to calibrate a plant process model, which was leveraged to better evaluate near-term recommendations, establish unit process capacity, and further evaluate future nitrogen removal alternatives. The wastewater sampling plan was recommended for a period of one week.

City staff performed wastewater sampling from December 13 through December 19, 2023. Composite samples were collected for all liquid streams and grab samples were collected for solid streams. Since the composite samplers were not flow paced, the samples were blended manually to simulate the approximate flow characteristics. All samples were analyzed by FGL, Inc., located in San Luis Obispo.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
Table 1.8 summarizes the results from the recommended sampling plan. The wastewater sampling data collected was generally found to be consistent during the sampling period except for a few data points.

Some of the anomalies were resolved by following up with FGL, Inc. The key findings from the wastewater sampling data analysis include:
 The influent CBOD and TSS concentrations during the sampling period were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling period. » The influent samples were collected as flow-based composites during the sampling period, however, historically the influent samples have been collected as time-based composites.  The average influent COD to BOD5 ratio is about 2.6, which is high compared to the typical range of

1.8 to 2.2 for municipal wastewater. The higher ratio suggests the presence of industrial waste streams or other non-municipal components in the influent.
 The average particulate COD to VSS is about 2.0, which is the high end of the typical range of 1.4 to

2.0. The higher particulate COD to VSS also suggests the presence of industrial or other non-municipal components in the influent.
 The influent TKN and NH3-N averages around 64 and 51 mg/L, respectively. This results in a NH3-N to TKN ratio of 0.81, which is a little bit higher than the typical range of 0.5 to 0.75. Additionally, the presence of NO3-N and NO2-N at STFPS and effluent suggests that some incidental nitrification is occurring in the process.
 The soluble fraction for COD, BOD5, and CBOD is in the range of 55 to 60 percent which is higher than the typical range of 35 to 45 percent for municipal wastewater.  The primary clarifiers seem to be performing well within the typical range. The TSS and BOD5 removal is approximately 64 and 36 percent, respectively, compared to the typical TSS and BOD5 removals of 55 to 65 percent and 25 to 35 percent, respectively.
 The PTFs seem to be performing well based on the current organic loading, excluding recycle flows. » The CBOD removal is approximately 51 percent for PTF No. 1 based on the organic loading of 248 lbs BOD5/1,000 cubic feet (ft3)/day, which is higher than the typical removal of 30 percent at the same organic loading.
» The CBOD removal is approximately 55 percent for PTF No. 2 based on the organic loading of 151 lbs BOD5/1,000 ft3/day, which is higher than the typical removal of 40 percent.  The intermediate clarifier provides about 13 percent TSS removal. This may just be a reflection of the relatively poor settleability of the PTF solids.
 The STFs seem to be performing below typical values based on the current organic loading. The CBOD removal is approximately 60 percent for the current organic loading of 43 lbs BOD/1,000 ft3/day, which is lower than the typical removal of 70 percent at the same organic loading.
 The VSS to TSS ratio was consistent for primary sludge and was approximately 90 percent. However, there was a lot of variation in the TSS and VSS data for the sampling period.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
Table 1.8 Summary of Wastewater Sampling Plan Data
Sample Unit
Composite Samples(1)(2) Grab Samples(1)
Influent GC
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
PTFPS PTF No. 1
Effluent
PTF No. 2
Effluent
Intermediate
Clarifier
Effluent
STFPS STF No. 1
Effluent
STF No. 2
Effluent Effluent Primary Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow Digester Drying Bed Supernatant
Solids Off-Hauled(3)
Field Measurements
Flow mgd 6.6(3)
Temperature deg C 21 18.7 34.6
pH 7.6 7.8 7.0
Gas Flow scfm 14(3)
Unfiltered
COD mg/L 915 1,001 610 390 418 382 392 326 280 201 209 165 703 1,339 BOD5 mg/L 358 146 101 66
CBOD mg/L 329 326 200 141 132 115 104 70 49 49 29 235 180 TSS mg/L 232 296 168 61 71 91 87 79 55 62 56 28 2,857 746 2,126 35,714 323 15,714 51 -- VSS mg/L 210 61 70 86 87 55 59 55 2,536 693 1,926 31,629 12,414 -- TKN mg/L 64
TP mg/L 10.8 8.7
Alkalinity mg/L
CaCO3
354 386 346 310 18,833
Filtered(3)
sCOD mg/L 491 476 323 270 287 236 222 182 113
sBOD5 mg/L 209 90 39 18
sCBOD mg/L 195 93 54 53 36 17
sTKN mg/L 53 37
Ortho-P mg/L 5.1
Filtered(4)
NH3-N mg/L 51 55 45 40
NO3-N mg/L 0.2 0.1 1.3 3.3
NO2-N mg/L 0.0 0.03 1.3 2.4
TN mg/L 54 48 43
Flocculated/Filtered(5)
ffCOD mg/L 262
Notes:
(1) Average of one-week sample period (December 13 through 19, 2023). (2) Composite samples were time-based on 13 and 14 December and flow-based from 15 to 19 December. (3) Based on routine sampling.
(4) Filtered through 1.2 - 1.5 micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45 micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with DI water. (6) Sample preparation per Mamais et al., 1993.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
 The VSS to TSS ratio was also consistent for thickened sludge and was approximately 90 percent. The TSS and VSS data were mostly consistent for the sampling period except for one day (December 13, 2023).
 The VSS to TSS ratio was also consistent for digested sludge and was approximately 75 percent. The TSS and VSS data were fairly consistent throughout the sampling period.

The results from the wastewater sampling exercise were used to evaluate performance and develop unit process ratings discussed in Section 1.4.5 and calibrate a process model discussed in Section 1.5.

1.4.5 Unit Process Evaluation
An understanding of the WWTP's unit process performance is critical to evaluating WWTP's capacity. The historical load and performance of each unit process was compared to the original design criteria and typical anticipated performance. The performance of each unit process provides a benchmark for the planning of new facilities and assessing capacity. Table 1.9 summarizes the results of the performance evaluation for City's WWTP based on the historical as well as additional data collected during the wastewater sampling event. The rest of this section provides a focused discussion of the operating conditions and performance for the primary, secondary, and solids handling processes.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19
Table 1.9 Unit Process Performance
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment Influent Flow
AA, mgd 12.5 O&M Manual 7.1 Variable Projections to be developed MM, mgd 13.5 O&M Manual 8.2 Variable Projections to be developed PH, mgd 24.0 O&M Manual To be developed after
receiving hourly data
Variable Projections to be developed
Primary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 379 O&M Manual 216 800 - 1,200 379 Overflow Rate at AA Flow with Recirculation, gpd/ft2 925 O&M Manual 687 800 - 1,200 925 CBOD Percent Removal 36 O&M Manual 30(2) 30 - 35 30
TSS Percent Removal 54 O&M Manual 64(2) 60 - 65 64
PTFPS
Flow Rate, mgd 19.5 O&M Manual 19.5 Variable 19.5
PTF No. 1
Flow Rate, mgd 11.7 O&M Manual 11.7 Variable 11.7
Hydraulic Loading, gpm/ft2 2.9 O&M Manual 2.9(2) 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

2.9 Recirculation Ratio at AA Flow 0.67 O&M Manual 0.67 Variable, hydraulic and organic loading more critical 0.67 BOD5 Loading, lbs/1,000 ft3/day 385 w/ recycle
365 w/o recycle
O&M Manual 380(2) w/ recycle
248(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
248
Distributor Rotational Speed, secs/rotation 30 to 60 O&M Manual 45 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 30 to 60 Calculated based on Distributor Rotation and Flow Rate
45 Depends on BOD5 Loading, 200 to 600 mm/rotation recommended for BOD5 loading 200 lbs/1,000 ft3/day
200
Performance for BOD5 Removal, % 35 w/ recycle
55 w/o recycle
O&M Manual 13(2) w/ recycle
51(2) w/o recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
51 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment PTF No. 2
Flow Rate, mgd 7.8 O&M Manual 7.8 Variable 7.8
Hydraulic Loading, gpm/ft2 1.9 O&M Manual 1.9(2) 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

1.9 Recirculation Ratio at AA Flow 1.0 O&M Manual 1.0 Variable, hydraulic and organic loading more critical 1.0 BOD5 Loading, lbs/1,000 ft3/day 255 w/ recycle
250 w/o recycle
O&M Manual 253(2) w/ recycle
151(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
151
Distributor Rotational Speed, secs/rotation 60 O&M Manual 150 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 40 Calculated based on Distributor
Rotation and Flow Rate
100 Depends on BOD5 Loading, 200 to 600 mm/rotation recommended for BOD5 loading 200 lbs/1,000 ft3/day
150
Performance for BOD5 Removal, % 35 w/ recycle
74 w/o recycle
O&M Manual 21(2) w/ recycle
55(2) w/o recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
55 Intermediate Clarifier
Flow Rate, mgd 3.6 O&M Manual 3.5 Variable 3.5
Nominal Overflow Rate at AA Flow, gpd/ft2 935 O&M Manual 909 800 - 1,200 909 STFPS
Flow Rate, mgd 23 O&M Manual 23 Variable 23
STFs
Hydraulic Loading, gpm/ft2 0.31 O&M Manual 0.31() 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

0.31 Recirculation Ratio at AA Flow 0.46 O&M Manual 0.68 Variable, hydraulic, and organic loading more critical 0.46 BOD5 Loading, lbs/1,000 ft3/day 111 w/ recycle
75 w/o recycle
O&M Manual 73(2) w/ recycle
43(2) w/o recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
43 Distributor Rotational Speed, secs/rotation 150 to 180 O&M Manual 150 (July 19-20, 2023, visit) Variable 480 SK, mm/rotation -- -- 15 to 20 Depends on BOD5 Loading, 100 to 300 mm/rotation recommended for BOD5 loading 100 lbs/1,000 ft3/day
50 Performance for CBOD Removal, % 56 w/o recycle -- 60(2) w/o recycle 40 - 70% BOD5 Removal (Roughing) < 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
60 Secondary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 400 O&M Manual 232 400 - 800 400 Overflow Rate at AA Flow with Recirculation, gpd/ft2 750 O&M Manual 747 800 - 1,200 750 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
Process/Parameter Original Design
Capacity or Rating Source Average Performance From 2018 - 2024 MOP 8(1) or Typical Values Recommended Operation for Performance Assessment Gravity Thickeners
Hydraulic Loading, gpd/ft2 462 O&M Manual 338(2) 500 to 750 462 Solids Loading, lbs BOD5/ft2/day 24 O&M Manual -- 12 to 20 12 to 20 Solids Loading, lbs TSS/ft2/day 14.2 -- 9.3(2) <22 <22
Thickened Sludge TSS, % 6.5 O&M Manual 4.5(2) 5 to 9 4.5 Digesters
HRT, days 20 O&M Manual 15.9 15 day minimum for single-stage mesophilic digesters (Class B) 20 Percent TS -- -- 2.3 1.5 to 2.5 Developed for Capacity Evaluation Percent VS -- -- 1.6 1.0 to 1.7 Developed for Capacity Evaluation VSS Loading, lbs/ft3/day 0.10 - 0.15 O&M Manual 0.146 0.15 - 0.20 0.15 - 0.20 VS Reduction, % 55 O&M Manual 61 Minimum 38 percent for Class B Minimum 38 percent for Class B Volatile Acids, mg/L 50 to 500 O&M Manual 166 500 Max 500 Max Alkalinity, mg/L as CaCO3 1,500 to 3,000 O&M Manual 3,300 1,500 to 5,000 1,500 to 5,000 Volatile Acids/Alkalinity Ratio -- -- 0.05 0.10 to 0.35 0.10 to 0.35 pH 6.8 to 7.4 O&M Manual 7.0 6.8 to 7.2 6.8 to 7.2
Gas Production, ft3/day -- -- 151,000 Variable Variable Gas Production, ft3/lb VS removed 12 to 17 O&M Manual 17.4 12 to 18 12 to 18 Sludge Drying Beds
Solids Loading, lbs/day 15,700 O&M Manual 11,000 Variable 15,700 Solids Loading, lbs/ft2/year 10.9 O&M Manual 7.6 15 to 25 (typical) 11 Solids Off Hauled From Beds (Wet Tons/year) -- -- 19,660 Variable -- Percent TS Off Hauled 60% O&M Manual 70% reported 50 to 90% 70 Notes:

CaCO₃ - calcium carbonate; ft2 - square feet; gpm - gallons per minute; HRT - hydraulic residence time; mm - millimeter; PTFPS - primary trickling filter pump station; TS - total solids; VS - volatile solids; SK - Spulkraft. (1) Design of Water Resource Recovery Facilities, MOP8. (2) Determined from a special 1-week sampling event conducted in December 2023.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22

1.4.5.1 Primary Treatment
The primary treatment system includes both clarification and biological treatment. Primary clarifiers remove settleable solids and floatable from wastewater through quiescent conditions that allow sedimentation of heavier particles (sludge) and flotation of lighter solids (scum). Effluent from both primary clarifiers is pumped to both PTFs through the PTFPS. When influent flows to the plant are above

3.9 mgd, the total primary clarifier effluent will exceed 19.5 mgd. The excess flow to the PTFPS falls over a weir, mixes with intermediate clarifier effluent, and then flows to the secondary treatment process. The settled primary sludge is pumped to the gravity thickeners.

Primary Clarifiers
Following preliminary treatment, the primary influent flow is combined with recycle flow from the PTFs in the mixing box at the outlet end of the grit chamber. The primary influent also includes sludge from the intermediate and secondary clarifiers, which are returned to Junction Box C upstream of the grit chamber.

The settled primary sludge is moved inward toward the sludge pocket in the clarifier bottom by two rows of angled scrapers, one row mounted on each arm of the continuously rotating clarifier sweep mechanism. The primary sludge is withdrawn continuously by the primary sludge pumps which transfer it to the gravity thickeners.

Surface overflow rate (SOR) is a key parameter used for design and assessment of primary clarifiers.

Figure 1.10 shows the SOR for the primary clarifier at WWTP for the evaluation period. SOR for primary clarifiers was calculated using the average daily flow for the evaluation period and a constant recycle flow of 16 mgd. As seen in Figure 1.8, the SOR for primary clarifiers is below the average design value and well within the typical SORs for primary clarifiers. The average CBOD and TSS removal during the sampling period was 30 and 64 percent, respectively. The performance of the primary clarifier is also well within the typical range of 30 to 35 percent CBOD and 60 to 65 percent TSS removal. The removal rate is expressed in terms of CBOD since CBOD data was collected for all streams instead of BOD5.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.10 SORs for Primary Clarifiers
Primary Trickling Filters
Both primary clarifiers discharge effluent through a common pipe to the PTFPS wet well. The pumping rate for PTF No. 1 is 11.7 mgd and for PTF No. 2 is 7.8 mgd. A portion of the flow from PTF No. 1 goes to an Intermediate Clarifier, discussed below, and the remainder is recycled, together with all flow from PTF No. 2.

The distributed wastewater trickles slowly down through the 12-foot depth of plastic media. The type of plastic media is not indicated in the O&M manual, although most plastic media for this type of filter would be a vertical configuration.

The trickling filters are typically characterized based on three parameters: BOD5 removal efficiency, hydraulic loading, and organic loading. Both PTF No. 1 and PTF No. 2 have very high hydraulic and organic loadings (2.9 and 1.9 gpm/ft2; and 385 and 285 lbs BOD5/1,000 ft3/day respectively) based on the design criteria and are therefore classified as "roughing" filters. Note that the organic loadings in the design criteria are calculated including recycle. The rotational speed for the distributor arm results in an SK value ranging from 45 to 100 mm/rotation. This is a measure of the amount of water applied per 1 revolution of the distributor arm. For trickling filters operating at such a high loading rate, a minimum SK value of 200 to 600 mm/rotation is recommended to maintain healthy biology. With too low of an SK value, the trickling filter may be more susceptible to experiencing poor hydraulic distribution and VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
flushing, which could result in septic conditions within the unit. Increasing the SK value can be achieved by reducing the rotational speed of the distributor.

The filters are designed to achieve 35 percent BOD5 removal and no nitrogen removal. Based on the wastewater sampling, the organic loading excluding recycle for PTF No. 1 and No. 2 is 248 and 151 lbs BOD5/1,000 ft3
/day, respectively. The organic loading with recycle for PTF No. 1 and No. 2 is 380 and 253 lbs BOD5/1,000 ft3
/day. The average CBOD removal for PTF No. 1 and No. 2 from the sampling plan is 51 and 55 percent, respectively. The removal rates and loadings are calculated in terms of CBOD since CBOD data was collected for all streams instead of BOD5.

Intermediate Clarifier
The Intermediate Clarifier is unique in that it only receives flow from PTF No. 1 and is the only clarifier at this treatment plant which does not have scum collection or removal equipment. All floatable material, which may be present in the intermediate clarifier, will pass over the effluent weir and ultimately be removed in the secondary clarifiers.

Up to 3.9 mgd of the effluent from PTF No. 1 is sent to the intermediate clarifier to remove settleable solids. The clarified effluent from the intermediate clarifier flows through a 24-inch pipe to a small box at the outlet side of the PTFPS, where it is combined with the portion of the primary clarifier effluent which has not been pumped to either PTF.

The intermediate clarifier provides only 13 percent TSS removal and therefore, it is not performing well. As mentioned, this is probably as a result of the poor settling characteristic of the PTF solids.

1.4.5.2 Secondary Treatment
The secondary treatment system consists of two STFs, two secondary clarifiers, a STFPS, secondary pump station, and percolation ponds. Secondary treatment is a biological process that removes BOD5 and TSS from the wastewater to meet regulatory requirements. The plant effluent is then discharged to percolation ponds, where the water is returned to the groundwater basin.

Secondary Trickling Filters
The STFs receive flow from the STFPS. The feed is a mixture of bypass flow from the PTFPS and overflow from the Intermediate Clarifier. The flow is distributed evenly over both STFs through rotary distributor arms. The filters are filled with modular plastic cross-flow media to a depth of 3.33 feet. As water flows through the filter media, biological organisms growing on the media draw remaining organic material from the wastewater and convert it to settleable solids.

To maintain the required wetting rate on the STFs, a portion of the secondary clarifier effluent is recycled to the pump station. The amount of recycled secondary effluent decreases as primary effluent flow increases.

With a design hydraulic loading rate of 0.31 gpm/ft2 and an organic loading rate (including recycle) of 111 lbs BOD5/1,000 ft3/day, the STFs (like the PTFs) are classified in the high-rate range. The current hydraulic loading for the STFs is estimated to be 0.33 gpm/ft2, which is close to the design value but on the low range of typically recommended hydraulic loading rates. Insufficient wetting rates could result in poor hydraulic distribution within the media, and reduced performance. The secondary distributors rotate VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
at 2.5 to 3 minutes per revolution, which results in a SK value of 15 to 20 mm/rotation. At the design organic loading rate, the recommended SK value is 100 to 300 mm/rotation. Like the PTFs, the secondary filters may benefit from reducing the distributor rotational speed.

The average organic loading (excluding recycle) for STFs is 43 lbs BOD5/1,000 ft3 /day, and the average
CBOD removal (excluding recycle) is 60 percent. The removal rates and loadings are calculated in terms of CBOD since CBOD data was collected for all streams instead of BOD5.

Secondary Clarifiers
The secondary clarifiers provide quiescent conditions for the sludge to settle and scum to float to the surface. Secondary clarifier effluent flow that is not recirculated back to the STFs is discharged to the percolation ponds. Settled secondary sludge or scum collected in the secondary clarifiers is pumped back to upstream of the grit chambers. The secondary clarifiers are operating at their design SOR rate of 750 gpd/ft2 (including recirculation), which is well within typical rates for clarifiers.

The secondary clarifiers are shallow with a depth of 10 ft. Typical depth for secondary clarifiers ranges from 14 to 16 ft. The shallow secondary clarifiers are suitable for a two-stage trickling filter process since the solids loading is typically lower than an activated sludge process.

1.4.5.3 Solids Handling
The solids handling system includes sludge and scum pumping, sludge thickening, sludge digestion, digested sludge settling, drying, and disposal. The purpose of the gravity thickeners is to receive all sludge pumped from the primary clarifiers and provide quiescent conditions during which the sludge and scum will thicken until a concentration of solids is reached which is suitable for addition to the digesters, typically in the 3 to 5 percent range.

The purpose of the digesters is to retain the digesting sludge under anaerobic conditions for a minimum period in order to stabilize the biosolids sufficiently for disposal.

Gravity Thickeners
The gravity thickeners receive all the sludge pumped from the primary clarifiers. Gravity thickeners are evaluated based on hydraulic loading and solids loading. The current hydraulic loading rate for the gravity thickeners is approximately 338 gpd/ft2 compared to the design hydraulic loading rate of 462 gpd/ft2. The design organic loading rate is 24 lbs BOD5/ft3/day. The thickened sludge is pumped to the digesters, and the clarified thickener overflow is returned to the PTFPS.

Figure 1.11 shows the thickened sludge flow which is pumped to the digesters and Figure 1.12 shows the percent TS for thickened sludge during the evaluation period. The target percent TS for thickened sludge is 6.5 percent. However, for the evaluation period, the average percent TS for thickened sludge is about

4.5 percent as shown in Figure 1.12. The overflow rate is below the design value and within typical rates for the thickeners. The solids loading rate is approximately 9.3 lbs TSS/ft2/day, which is below the design rate of 14.2 lbs TSS/ft2/day and well below the typical maximum loading rate of 22 lbs TSS/ft2/day.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
Figure 1.11 Thickened Sludge Flow Rates
Figure 1.12 Thickened Sludge TS Concentration
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
Digesters
The anaerobic digestion of sludge by bacteria is a sequential process. The first stage is acid fermentation, and the second stage is methane fermentation. The organic acids produced during acid fermentation are subsequently utilized by bacteria, resulting in the release of methane and carbon dioxide gas. Both stages occur in the single-stage mesophilic digesters operated by the City.

Stabilization of the sludge is accomplished during the methane fermentation stage. In this stage, the organic acids produced during acid fermentation are converted to methane and carbon dioxide resulting in a reduction of the organic material in the system.

VS loading and the HRT are key parameters used for assessing performance. The design HRT for the digesters at the WWTP is about 20 days. For the evaluation period, only two out of four digesters were in operation (No. 1 and No. 3). The digesters operate in parallel, and the average HRT for Digesters No. 1 and No. 3 is approximately 16 days. Figure 1.13 shows the daily average HRTs for Digesters No. 1 and No. 3. While the average is above the regulatory required minimum HRT of 15 days to achieve a Class B biosolids, there are periods where the HRT approaches 15 days. This is likely due to the lower percent solids of the thickened feed from the gravity thickeners (4.5 percent versus 6.0 percent).

Figure 1.13 Anaerobic Digester Hydraulic Retention Time VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
VS loading rate for the evaluation period was about 0.15 lbs/ft3/day as shown in Figure 1.14. Typical values for VSS loading ranges from 0.12 to 0.16 lbs/ft3/day. The VSS loading is at the lower end of the recommended maximum range of 0.15 to 0.20 lbs/ft3/day.

Figure 1.14 Anaerobic Digester VS Loading Rate
Apart from the HRT and VSS loading, other operational parameters used to assess their health are illustrated in Figure 1.15 through Figure 1.21 below. In general, all of the parameters evaluated indicate the digesters are performing well and within their design and typical values. The typical maximum operating range for all the parameters is shown in the grey shaded zone.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
Figure 1.15 Anaerobic Digester pH
Figure 1.16 Anaerobic Digester Volatile Acids
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30
Figure 1.17 Anaerobic Digester Alkalinity
Figure 1.18 Anaerobic Digester Gas Production
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
Figure 1.19 Anaerobic Digester Temperature
Figure 1.20 Anaerobic Digester VS Reduction
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Figure 1.21 Anaerobic Digester Volatile Acids/Alkalinity Ratio Sludge Drying Beds
Digested sludge is transferred from the digesters to drying beds. Each of the sludge beds is equipped with overflow rings that are used to decant clear liquid from the beds back to the decant pump at Supernatant Pit No. 1. By decanting clear liquid, the drying time in the bed can be reduced. The City's WWTP has about 18 drying beds that cover 12 acres of land. The design solids loading rate is

10.9 lbs/ft2/year. Based on the reported digested sludge quantity and characteristics, the average solids loading during the review period is calculated to be 7.6 lbs/ft2/year and should have capacity to accommodate more sludge. Note that during wet years, the available capacity may be less. Reported TS concentration off hauled from the drying beds is 70 percent.

1.5 Process Modeling - Existing Facilities
A steady state plant wide model was developed using BioWin version 6.2 (EnviroSim) to help evaluate the current performance, near-term recommendations, and evaluate future nitrogen removal alternatives.

Figure 1.22 shows a process flow schematic developed in BioWin for the WWTP.

The model was developed using custom-configured unit process modules that reflect the existing configuration and operation at the City's WWTP. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model. Historical operational data and data collected from the wastewater sampling plan were used to calibrate the model.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Figure 1.22 Process Model for City's WWTP
The BioWin model utilizes COD modeling which uses influent COD data as an input as well as various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as CBOD, BOD5 and TSS are calculated based on the influent COD and specified wastewater fractions.

Based on the sampling plan data, the COD to BOD5 and COD to CBOD ratio in the influent was higher than the typical range for municipal wastewater. Therefore, three different process modeling approaches were used to match the influent wastewater characteristics and current plant performance.

The first approach focused on matching the influent COD concentrations while modifying wastewater fractions calculated from the sampling plan only. Since the COD to CBOD ratio during the sampling period was higher than the typical range, it was difficult to match the influent CBOD for this approach without calibrating additional parameters.

The second approach focused on matching influent COD, BOD, and TSS concentrations while modifying wastewater fractions calculated from the sampling plan as well as additional parameters to help calibrate the influent wastewater characteristics and current plant performance. This approach provided a good match on the influent and secondary trickling filter performance; however, it didn't provide a good match for the PTF performance. This approach provided an insight into the overall performance of the City's WWTP. Based on the sampling plan results and model prediction results from the second approach, it was concluded that the PTFs are performing better than their design values while the STFs are performing worse than their design values.

The third approach focused on matching the primary and secondary trickling filter performance by modifying the specific area for both primary and STFs which directly affects the performance of the trickling filters.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
The calibrated parameters for each of the three modeling approaches are listed in Table 1.10.

Table 1.10 Process Model Calibration Parameters
Parameter Default/Design Approach 1 Approach 2 Approach 3 Fbs - readily biodegradable COD (including acetate) 0.16 0.35 0.35 0.35 Fus - unbiodegradable soluble 0.05 0.1 0.1 0.1
Fna - ammonia 0.66 0.81 0.81 0.81
Fpo4 - phosphate 0.50 0.48 0.48 0.48
Particulate COD:VSS 1.63 2.00 2.00 2.00
BOD calculate rate constant for Xsc degradation 0.5 0.5 0.1 0.1 BOD calc rate constant for Xsp degradation 0.5 0.5 0.1 0.1 PTF No. 1 Specific Area, ft2/ft3 27 27 27 105
PTF No. 2 Specific Area, ft2/ft3 42 42 42 85
STF No. 1 & No. 2 Specific Area, ft2/ft3 42 42 42 18
Table 1.11 provides the model outputs for each of the three approaches. As described earlier, approach 1 and 2 do not match the PTF performance and approach 3 matches the overall plant performance. A few observations worth noting from model calibration are:
 For approach 2, the BOD rate constants had to be modified significantly. The BOD rate constant accounts for BOD inhibition due to additional non-municipal influent load.  Approach 2 matches the sampling period data for most of the key process streams and parameters except for PTF No. 1 and No. 2 effluent.
 For approach 3, the specific areas for PTFs and STFs had to be modified significantly to match the performance.
 Approach 3 matches the sampling period data the best (<10 percent difference) for key process streams and parameters.
 For each of the approaches the model predicted higher TS (lbs/day) loading for sludge thickeners and anaerobic digesters compared to the data collected from the sampling event. However, when compared to the historical data, the thickened sludge and digested sludge data better match the model outputs. Since the primary, thickened, and digested sludge samples were analyzed as grab samples, it is possible that the data collected from the sampling period is not representative of the actual TS loading. Furthermore, both primary, thickened, and digested sludge data showed a lot of variation during the sampling period. Additionally, the WWTP experienced lower incoming loads during the sampling event.

The process model was used to evaluate various near term process improvement recommendations and the findings from the evaluation are described in the draft of TM 1, included in Appendix A.

VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35
Table 1.11 Process Model Calibration Summary
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Influent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 915 915 915 915
CBOD, mg/L(1) 317 447 320 320
TSS, mg/L 232 249 243 243
TKN, mg/L 64 64 64 64
Grit Chamber Influent
Flow, mgd 7.23 7.23 7.23 7.23
COD, mg/L 1,001 1,004 1,026 993
CBOD, mg/L 326 500 367 349
TSS, mg/L 296 369 349 323
Grit Chamber Effluent
Flow, mgd 23 23 23 23
COD, mg/L 610 642 626 538
CBOD, mg/L 200 305 239 180
TSS, mg/L 168 184 170 174
Primary Effluent
Flow, mgd 23 23 23 23
COD, mg/L 390 465 459 368
CBOD, mg/L 141 228 194 133
TSS, mg/L 61 68 63 64
CBOD Removal, % 30 27 21 28
TSS Removal, % 64 64 64 64
PTFPS
Flow, mgd 23 23 23 23
COD, mg/L 418 481 465 374
CBOD, mg/L 132 236 361 268
TSS, mg/L 71 78 67 68
PTF No. 1 Effluent
Flow, mgd 11.7 11.7 11.7 11.7
COD, mg/L 382 472 457 350
CBOD, mg/L 115 225 188 110
TSS, mg/L 91 91 80 100
CBOD Removal, % 51 55 35 56
Organic Loading, lbs BOD5/1,000 ft3/day 248 244 309 267 VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 PTF No. 2 Effluent
Flow, mgd 7.8 7.8 7.8 7.8
COD, mg/L 392 448 432 314
CBOD, mg/L 104 209 174 96
TSS, mg/L 87 109 98 113
CBOD Removal, % 55 43 40 62
Organic Loading, lbs BOD5/1,000 ft3/day 151 148 126 86
Intermediate Clarifier Effluent
Flow, mgd 3.4 3.4 3.4 3.4
COD, mg/L 326 465 449 341
TSS, mg/L 79 87 75 94
TSS Removal, % 13 9 10 10
STFPS
Flow, mgd 21 21 21 21
COD, mg/L 280 262 255 222
CBOD, mg/L 70 98 82 59
TSS, mg/L 55 52 47 45
STF No. 1 & No. 2 Effluent
Flow, mgd 21 21 21 21
COD, mg/L 205 216 208 198
CBOD, mg/L 49 60 50 45
TSS, mg/L 59 81 75 58
CBOD Removal, % 60 74 74 63
Organic Loading, lbs BOD5/1,000 ft3/day 43 80 35 42
Effluent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 165 156 153 154
CBOD, mg/L 29 32 27 28
TSS, mg/L 28 37 34 27
NH3-N, mg/L 37 48 48 49
NO3-N, mg/L 2.4 0 0 0
NO2-N, mg/L 3.3 0 0 0
TIN, mg/L 42.7 48 48 49
Primary Sludge
Flow, mgd 0.65 0.65 0.65 0.65
TSS, mg/L 2,857 4,198 3,880 3,977
TSS, lbs/day 15,489 22,760 21,032 21,560
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Thickener Underflow
Flow, mgd 0.06 0.06 0.06 0.06
% TS 3.6 4.5 4.4 4.5
TS, lbs/day 17,871 22,346 21,797 22,344
Digested Sludge
Flow, mgd 0.055 0.055 0.055 0.055
% TS 1.6 2.2 2.1 2.2
% VS 0.69 0.76 0.79 0.79
HRT, days 19 19 19 19
VS Removed, % 58 58 58 58
VS Removed, lbs/day 10,406 10,540 10,575 10,861
Gas, scfm 107 131 133 133
Gas, scf/lbs VS Removed 14 18 18 18
Solids to Beds
TS, lbs/day 7,166 10,204 9,669 9,883
Solids Off-Hauled from Beds
TS, lbs/day -- 9,694 9,476 9,685
Notes:
(1) BioWin uses CBOD for its calculations.

1.6 Capacity Evaluation
The City is at a cross-roads in deciding whether to continue to invest in the trickling filter facilities or pivot to the planning and design of new activated sludge facilities. While the development of the existing trickling filter plant model was useful for characterizing the City's influent and evaluating unit process performance and optimization opportunities, there is little value in developing unit process capacity ratings for the existing facility due to the following reasons:
 The influent loads to the WWTP are nearing the original design capacity, and the WWTP is having issues complying with the previous discharge Requirements (Order No. R3-2010-000) for BOD5 and TSS. Furthermore, the future discharge limits (Order No. R3-2020-0020) are more stringent with respect to both BOD5 and TSS, and include a TN limit too. As a result, with future limits and WWTP capacity in mind, major modifications would be necessary. While interim optimization improvements will improve effluent quality, they are unlikely to be the most cost-effective solution for meeting future limits long term.

Developing unit process capacity criteria for the existing plant will not be useful to the City unless the City is committed to staying with trickling filter technology. Assuming the City is likely to move away from trickling filter technology, unit process capacities should be established for any facilities that will be retained once an alternative is selected. This is because the unit processes are designed to work in tandem, and the biological sludge production and capacity will be different depending on the secondary process technology in use. Ultimately this will impact the rated capacity for all biological and solids handling processes. It is recommended that unit process capacities be developed once an alternative selection is made. Discussion of treatment alternatives for meeting the future effluent discharge limits is presented in Volume 6 - Liquid Treatment.