VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A TM 1: EXISTING WWTP PROCESS,

HISTORICAL PERFORMANCE, AND

CONCEPTS FOR NEAR-TERM EFFLUENT

QUALITY IMPROVEMENT

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 1
Existing WWTP Process, Historical Performance,
and Concepts for Near-Term Effluent Quality
Improvements
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
TECHNICAL MEMORANDUM 1
Existing WWTP Process, Historical
Performance, and Concepts for
Near-Term Effluent Quality
Improvements
FINAL / October 2026
Digitally signed by Andre Gharagozian
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.22 14:54:18-07'00'
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/TM01/TM01 Contents
TM 1 EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND

CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY

IMPROVEMENTS

1.1 Purpose and Recommendations 1-1

1.2 Flow and Load Summary 1-2

1.3 Existing Facilities Description 1-7

1.4 Performance Evaluation 1-9

1.4.1 Permit Limits 1-9

1.4.2 Historical Performance 1-11

1.4.3 Effluent Nitrogen 1-12

1.4.4 Wastewater Sampling and Characterization 1-12

1.4.5 Unit Process Evaluation 1-15

1.5 Process Modeling 1-29

1.6 Optimization Elements 1-34

1.6.1 Influent Loading 1-34

1.6.2 Primary Clarifiers 1-35

1.6.3 PTFs 1-35

1.6.4 STFs 1-36

1.6.5 Secondary Clarifiers 1-36

1.6.6 Gravity Thickeners 1-37

1.7 Recommendations and Next Steps 1-37
Appendices
APPENDIX 1A DESIGN CRITERIA
APPENDIX 1B RECOMMENDED SAMPLING PLAN
APPENDIX 1C SK VALUE CALCULATIONS
Tables
Table 1.1 Historical Influent Flow and Peaking Factor Data 1-2 Table 1.2 Historical Influent Concentrations 1-3
Table 1.3 Historical Influent Loadings 1-4
Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) 1-9 Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 1-10
Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 1-10
Table 1.7 Summary of Historical Performance Through September 2023 1-11 Table 1.8 Summary of Wastewater Sampling Plan Data 1-14 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 1.9 Unit Process Performance 1-16
Table 1.10 Process Model Calibration Parameters 1-31
Table 1.11 Process Model Calibration Summary 1-32
Figures
Figure 1.1 Historical Influent Flow 1-3
Figure 1.2 Historical Influent CBOD, BOD₅ and TSS Concentrations 1-5 Figure 1.3 Historical Influent CBOD, BOD₅ and TSS Loadings 1-6 Figure 1.4 Historical Influent TKN and NH3-N Concentrations 1-6 Figure 1.5 Process Flow Diagram 1-8
Figure 1.6 Effluent TSS and CBOD 1-11
Figure 1.7 Effluent Ammonia, Nitrate, and Nitrite 1-12
Figure 1.8 Surface Overflow Rates for Primary Clarifiers 1-20 Figure 1.9 Thickened Sludge Flow Rate 1-23
Figure 1.10 Thickened Sludge Total Solids Concentration 1-23 Figure 1.11 Anaerobic Digester Hydraulic Retention Time 1-24 Figure 1.12 Anaerobic Digester Volatile Solids Loading Rate 1-25 Figure 1.13 Anaerobic Digester pH 1-26
Figure 1.14 Anaerobic Digester Volatile Acids 1-26
Figure 1.15 Anaerobic Digester Alkalinity 1-27
Figure 1.16 Anaerobic Digester Gas Production 1-27
Figure 1.17 Anaerobic Digester Temperature 1-28
Figure 1.18 Anaerobic Digester Volatile Solids Reduction 1-28 Figure 1.19 Anaerobic Digester Volatile Acids/Alkalinity Ratio 1-29 Figure 1.20 Process Model for City’s WWTP 1-30
Figure 1.21 Primary Clarifier Performance Improvement 1-35 Figure 1.22 Secondary Clarifier Performance Improvement 1-37 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
AA annual average
BOD₅ 5-day biochemical oxygen demand test
CaCO3 calcium carbonate
CBOD carbonaceous biochemical oxygen demand
City City of Santa Maria
ft2 square feet
ft3 cubic feet
gpd gallons per day
gpm gallons per minute
HRT hydraulic residence time
klb thousand pounds
lb pound
mg/L milligrams per liter
mgd million gallons per day
mL/L milliliters per liter
MM maximum month
mm millimeter
NH3-N ammonia
NO2-N nitrite
NO3-N nitrate
NOA Notice of Applicability
O&M operations and maintenance
PH peak hour
PTF primary trickling filter
PTFPS primary trickling filter pump station
RWQCB Regional Water Quality Control Board
SK Spulkraft
SOR surface overflow rate
STF secondary trickling filter
STFPS secondary trickling filter pump station
TKN total Kjeldahl nitrogen
TM technical memorandum
TN total nitrogen
TS total solids
TSS total suspended solids
VS volatile solids
VSS volatile suspended solids
WDR waste discharge requirements
WWTP wastewater treatment plant
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
TM 1 EXISTING WWTP PROCESS, HISTORICAL

PERFORMANCE, AND CONCEPTS FOR

NEAR-TERM EFFLUENT QUALITY

IMPROVEMENTS

1.1 Purpose and Recommendations
The purpose of this Technical Memorandum (TM) is to summarize the existing facilities at the City of Santa Maria (City) Wastewater Treatment Plant (WWTP), the facilities’ intended design basis, and to review historical wastewater influent and performance data. This TM also provides a basis for developing near-term recommendations to improve the WWTP’s performance and reliability for meeting the Waste Discharge Requirements (WDR).

As part of this assessment, Carollo Engineers has also developed a Wastewater Characterization Sampling Plan to supplement the routinely collected operating data. Once the results from that effort are complete, this TM will be updated. In addition, the results will be used to calibrate a plant process model, which will be leveraged to better evaluate near-term recommendations, establish unit process capacity, and evaluate future nitrogen removal alternatives.

The City should consider the following as opportunities to improve and optimize performance:
 Septage and Leachate Characterization - Characterize the loading impact of septage and leachate to determine if this is a contributing factor to recent performance changes. If so, the City may want to consider reducing or eliminating septage or leachate.
 Ferric Addition at Primary Clarifiers - Ferric chloride addition upstream of the primary clarifiers should improve liquid stream performance by removing biochemical oxygen demand. This was shown to be the case in the recently performed jar testing. But the cost to implement ferric chloride addition and the benefits should be considered once the wastewater characterization sampling results are available.
 Reduce Distributor Speed with Primary Trickling Filters (PTFs) and Secondary Trickling Filters (STFs) - A preliminary review of the Spulkraft (SK) values indicates the distributors on the PTFs are rotating much faster than typical recommended rates. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.
 STFs Feed Pumping - The wetting rate for the STFs is 0.3 gallons per minute (gpm)/square feet (ft2), which is on the low end of what is typically recommended for this type of filter (0.3 to 1.5 gpm/ft2).

Increasing the feed pumping rate and the wetting rate may improve flushing, oxygen transfer, and overall performance.
 Secondary Clarifier Performance - The City should consider the addition of a polymer at the secondary clarifiers to help reduce effluent total suspended solids (TSS) and 5-day carbonaceous TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
biochemical oxygen demand (CBOD) concentrations. Most polymer suppliers can offer support to perform jar testing and recommend a suitable polymer.

1.2 Flow and Load Summary
Table 1.1 summarizes the historical influent flow data for the City’s WWTP including annual average (AA), maximum month (MM), and peak hour (PH) flows from January 2018 through September 2023. The “design” values in the right-hand column show the design criteria taken from the most recent plant expansion project. Although the plant AA flow over the past six years is 7.3 million gallons per day (mgd) compared with the design flow of 12.5 mgd, the organic loading rates (discussed later) are relatively high.

Table 1.1 Historical Influent Flow and Peaking Factor Data Flow 2018 2019 2020 2021 2022 2023 Average Design
AA, mgd 7.4 6.8 7.3 7.0 7.3 7.7 7.3 12.5
MM, mgd 8.5 7.3 7.9 7.5 8.0 8.6 8.0 13.5
MM Peaking Factor
(i.e., MM/AA Flow)

1.15 1.07 1.08 1.07 1.10 1.08 1.10 1.08
PH, mgd -- 12.9 18.2 12.6 13.3 17.1 14.8 24
PH Peaking Factor
(i.e., PH/AA Flow)
-- 1.90 2.49 1.80 1.82 2.23 2.05 1.9
Figure 1.1 shows the average influent flow to the WWTP for the evaluation period. The solid black line represents the 30-day running average, which can be compared to the design MM flow. As seen in Figure 1.1, the average influent flow since 2018 has been fluctuating between 6 to 8 mgd and has slightly increased over the last couple of years. In general, influent flows are less than the design capacity, and MM and PH peaking factors are close to the original design basis.

The City regularly collects and analyzes 24-hour time-based (sampled every 20 minutes) composite samples of their influent just downstream of the bar screens. The CBOD and TSS are sampled biweekly, while influent nitrogen species are measured quarterly. Table 1.2 presents the historical concentration data, and Table 1.3 summarizes the average and maximum month historical loads of key constituents such as CBOD, TSS, total Kjeldahl nitrogen (TKN), and ammonia (NH3-N). The MM concentrations are calculated using MM loads and AA flow.

As shown in Table 1.2, the average annual CBOD over the last six years was 414 milligrams per liter (mg/L), roughly equal to a 5-day biochemical oxygen demand test (BOD₅) concentration of around 496 mg/L, assuming a ratio of 1.2. This ratio will be confirmed following the on-site sampling exercise referred to above. The average CBOD concentration so far for 2023 is 41 percent higher than the design value of 317 mg/L. So, although the current average influent flows are only about 64 percent of the design value, the influent CBOD load is more than 80 percent of the design value. Similarly, for TSS, the influent loads are currently more than 80 percent of the design value.

The NH3-N and TKN values are consistent with typical characteristics for domestic wastewater.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Figure 1.1 Historical Influent Flow
Table 1.2 Historical Influent Concentrations
Constituent 2018 2019 2020 2021 2022 2023 Average Design CBOD
AA, mg/L 410 411 413 380 407 412(2) 405 263(4)
MM(3), mg/L 469 453 527 450 496 521(2) 486 287(4)
BOD
AA, mg/L -- -- -- -- -- 504(5) 504 317
MM(3), mg/L -- -- -- -- -- --(6) -- 346
TSS
AA, mg/L 395 417 377 401 374 391 393 323
MM(3), mg/L 474 464 501 457 425 513 472 382
TKN
AA, mg/L 72 75 75 67 71 66 71 --
NH3-N
AA, mg/L 47 51 50 52 45 46 48 --
Notes:
(1) Samples analyzed once per week for CBOD and TSS, and quarterly for TKN and Ammonia-N. (2) Includes data through September only, City switched to sampling BOD₅ starting October 2023. (3) Back calculated using MM loading and average flows. (4) Calculated using the BOD₅ design values and an assumed CBOD to BOD₅ ratio of 0.83. (5) Includes data from October through December only.
(6) Not enough data to calculate MM concentration.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Table 1.3 Historical Influent Loadings
Constituent 2018 2019 2020 2021 2022 2023 Average Design CBOD
AA, klb/day 25.6 23.0 25.4 22.2 24.9 27.1(1) 24.7 27.4(2) MM, klb/day 28.9 25.7 32.1 26.1 30.2 33.4(1) 30.1 32.4(2) MM Peaking Factor
(MM/AA)

1.13 1.15 1.26 1.18 1.21 1.36 1.22 1.18(3)
BOD
AA, klb/day -- -- -- -- -- 28.0(4) 28.0 33.0
MM, klb/day -- -- -- -- -- --(5) -- 39.0
MM Peaking Factor
(MM/AA)
-- -- -- -- -- --(5) -- 1.18
TSS
AA, klb/day 24.7 23.4 23.1 23.4 22.8 24.9 23.7 33.6
MM, klb/day 29.2 26.3 30.5 26.5 25.9 32.9 28.5 42.8
MM Peaking Factor
(MM/AA)

1.33 1.12 1.32 1.13 1.16 1.30 1.23 1.27
Notes:
klb - thousand pounds
(1) Includes data through September only, City switched to sampling BOD₅ starting October 2023. (2) Calculated using the BOD₅ design values and an assumed CBOD to BOD₅ ratio of 0.83. (3) Assumed same design MM peaking factor as of BOD₅.
(4) Included data from October through December only.
(5) Not enough data to calculate MM loadings and peaking factor.

Figure 1.2 shows the historical average TSS and CBOD concentrations for the evaluation period. As seen in Figure 1.2, average TSS and CBOD concentrations have remained consistently in the range of 380 to 410 mg/L during the review period. However, TSS and CBOD concentrations are significantly higher than the original design values.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Figure 1.2 Historical Influent CBOD, BOD₅ and TSS Concentrations Figure 1.3 shows the historical average TSS and CBOD loadings at the WWTP. Although the TSS and CBOD concentrations are higher than the original design values, influent loads are still less than the design since the average influent flows are only 60 percent of the original design rating of 12.5 mgd AA flow. Both TSS and CBOD loadings have increased slightly in the last two years. Figure 1.4 shows the historical average TKN and NH3-N concentrations for the evaluation period. Average TKN and NH3-N concentrations have remained fairly consistent for the evaluation period.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.3 Historical Influent CBOD, BOD₅ and TSS Loadings Figure 1.4 Historical Influent TKN and NH3-N Concentrations TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7

1.3 Existing Facilities Description
The City’s WWTP is located at 601 Black Road, Santa Maria, California 93458. The WWTP is a two-stage trickling filter plant and is designed to treat 12.5 mgd of AA flow. The existing facilities description is primarily generated from the WWTP’s operations and maintenance (O&M) manual.

The influent wastewater flow is measured with a Parshall flume. The wastewater is then screened through a 0.5-inch bar screen to remove rags, sticks, and large objects that can clog pumps or damage equipment.

The screened wastewater then flows to two parallel aerated grit chambers to remove sand and grit followed by primary clarification. At the influent end of the grit chambers, plant recycle streams (digested solids decant from the drying beds, and underflow from the secondary clarifiers and the intermediate clarifier) blend with the raw influent flow before entering the grit chambers. Immediately downstream of the grit chambers, recycle from the two PTFs mixes with the flow leaving the grit chambers. This combined stream then flows to the two primary clarifiers.

The primary effluent further flows through the two-stage trickling filters including PTFs and STFs. The PTF stage includes two trickling filters with plastic media that operate in parallel. One PTF is followed by an intermediate clarifier that separates some of the solids to reduce the load on the STF system. A portion of the effluent from the PTFs is recirculated back through the primary clarifiers, as mentioned. The secondary stage includes two cross-flow, plastic media STFs that operate in parallel. The trickling filter effluent flows through the secondary clarifiers and a portion of the effluent is recirculated back to the secondary trickling filter pump station (STFPS) and the remainder is discharged to the percolation ponds.

There are a total of 17 percolation ponds of various sizes, with a total area of approximately 124 acres.

The ponds have various percolation rates and receive flow based on which are in operation at any given time. Flow is cycled between operating ponds. There are typically three or four ponds in drying mode preparing for discing and or re-grading.

Settled sludge and scum from the primary clarifiers is pumped to the gravity thickeners and the thickened sludge is then pumped to the digesters. Sludge removed from the intermediate clarifier and secondary clarifiers is pumped back to the grit chambers, and ultimately removed in the primary clarifiers. The digesters provide an anaerobic environment for the digestion of organic material. Digested sludge is dewatered in sludge drying beds where it can take several weeks or months to dry. Clear liquid, or supernatant from the beds is decanted back to the supernatant pit pump. Once the sludge is dried, it is removed from the sludge drying beds for disposal. Figure 1.5 shows the process flow diagram for the City’s WWTP as well as the estimated flow rates for the major process streams. Flow rates were developed based on the reported flows for the influent and thickened sludge and the design flows for the major pump stations. This information was incorporated into a preliminary process model of the WWTP, which was used to perform a flow balance of the WWTP and estimate recycle streams. The model was developed using EnviroSim’s commercially available software package, BioWin version 6.2. Appendix 1A includes a detailed summary of the WWTP’s original design criteria.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.5 Process Flow Diagram
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9

1.4 Performance Evaluation
Data from January 2018 to September 2023 was collected and analyzed to evaluate the WWTP's performance. In addition to monitoring influent data, the routine sampling includes the following constituents at the noted frequencies below:
 Effluent:
» CBOD and TSS are sampled weekly.
» NH3-N, nitrate (NO3-N), nitrite (NO2-N), TKN, and total nitrogen (TN) are sampled quarterly. » Boron, chloride, sodium, total dissolved solids, sulfate, pH, and settleable solids are sampled quarterly.
 Raw sludge:
» TSS and volatile suspended solids (VSS) are sampled weekly.  Digested sludge:
» TSS, VSS, alkalinity, volatile acids, methane production, hydrogen sulfide, temperature, and pH are sampled weekly.
 Solids hauled from the drying beds for disposal at landfill or composting operation (wet tons).

1.4.1 Permit Limits
The purpose of the City’s WWTP is to treat wastewater to a degree so that its disposal will not endanger public health or degrade groundwater quality. The degree of treatment is set by discharge requirements established by the Central Coast Regional Water Quality Control Board (RWQCB) Region 3. The 2011 treatment plant expansion allowed the City to comply with the WDR Order No. R3-2010-000, the limits of which are shown in Table 1.4.

Table 1.4 Summary of Previous Discharge Requirements (Order No. R3-2010-000) Constituent Monthly Average Daily Maximum
CBOD, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
Total Dissolved Solids(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
mL/L - milliliters per liter
(1) Compliance shall be based on a 3-year running mean.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
In June 2023, the City received a Notice of Applicability (NOA) from the RWQCB for enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements, for discharges from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd). The NOA terminated Order No. R3-2010-000. The City has been granted Interim Effluent Limits for two years, which are shown in Table 1.5. These are the same as those shown in Table 1.3, except that the effluent parameter has changed from CBOD to BOD₅. The City has requested that the RWQCB replace the BOD₅ limit for the interim period with CBOD.

After June 16, 2025, the limits in Table 1.6 will apply.

Table 1.5 Summary of New Interim Discharge Limits (Order No. R3-2020-0020) Until June 16, 2025 Constituent Monthly Average Daily Maximum
BOD₅, mg/L 60 100
TSS, mg/L 60 100
Settleable Solids, mL/L 0.1 0.4
Total Dissolved Solids(1), mg/L 1,000 --
Sodium(1), mg/L 180 --
Chloride(1), mg/L 180 --
pH within the range 6.5 to 8.4
Notes:
(1) Compliance shall be based on a three-year running mean.

Table 1.6 Summary of New Discharge Limits (Order No. R3-2020-0020) After June 16, 2025 Constituent 30-day Average 7-day Average Sample Maximum 25-month Rolling Median(1) BOD₅, mg/L 30 45 Not Applicable -
TSS, mg/L 30 45 Not Applicable -
Settleable Solids, mL/L 0.1 0.3 0.5 -
pH between 6.5 to 8.4 Not Applicable Not Applicable -
Total Dissolved Solids, mg/L - - - 1,000
Chloride, mg/L - - - 165
Sodium, mg/L - - - 105
Sulfate, mg/L - - - 500
Boron, mg/L - - - 0.5
TN, mg/L - - - 10
Notes:
(1) Based on the Upper Guadalupe Groundwater Basin. Rolling Median is the median from all data collected over the most recent 25 months.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11

1.4.2 Historical Performance
Table 1.7 provides a summary of the historical WWTP performance relative to the previous Order No. R3-2010-000 for TSS and CBOD concentrations. As can be seen, the WWTP was able to treat the influent flow and remain within the CBOD and TSS monthly average limit, however, there was one exceedance for TSS in 2019 based on the daily maximum limit. The monthly average concentrations for CBOD have increased over the last few years and the City has come close to exceeding the monthly limit in 2023. The cause for the increase is not known. The monthly average concentrations for TSS have remained consistent since 2020. Figure 1.6 presents the same information compared with monthly average and daily maximum limits for both CBOD and TSS concentrations.

Table 1.7 Summary of Historical Performance Through September 2023 Constituent Effluent Limit 2018 2019 2020 2021 2022 2023(1) CBOD, mg/L Monthly Maximum 60 42.5 42.6 41.9 45.4 45.1 50.4 Daily Maximum 100 63.3 72.6 57.7 88.0 59.0 79.0
TSS, mg/L Monthly Maximum 60 37.8 41.6 36.3 39.5 36.9 39.8 Daily Maximum 100 73.0 118.0 60.4 70.2 49.2 84.8
Notes:
(1) Includes data through September only.

Figure 1.6 Effluent TSS and CBOD
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12

1.4.3 Effluent Nitrogen
The City’s WWTP is a non-nitrifying two-stage trickling filter plant, therefore, nitrogen removal is not the main aim in terms of treatment, but will be by June 2025, unless this date can be extended for a period of time. Nevertheless, removal of nitrogen to achieve the new limit of 10 milligrams nitrogen per liter as TN will be required within the next 5 to 10 years. Therefore, it is important to assess the nitrogen constituents in the effluent.

Figure 1.7 shows the effluent NH3-N, NO3-N, and NO2-N concentrations. The average NH3-N is about 30 mg/L, NO3-N is about 4.0 mg/L, and NO2-N is about 2.0 mg/L. As seen in Figure 1.6 the higher NO3-N concentrations suggest some incidental nitrification may be occurring in the process.

Figure 1.7 Effluent Ammonia, Nitrate, and Nitrite

1.4.4 Wastewater Sampling and Characterization
A wastewater sampling plan was developed as part of this effort to supplement the routinely collected data. The additional data collected is utilized to assess the current performance of the WWTP and help in better characterizing the various process streams. The results from this effort are also used to calibrate a plant process model, which is leveraged to better evaluate near-term recommendations, establish unit process capacity, and further evaluate future nitrogen removal alternatives. The wastewater sampling plan was recommended for a period of one week. City staff performed wastewater sampling from December 13 through December 19, 2023. Composite samples were collected for all liquid streams and grab samples were collected for solid streams as shown in Table 1 in Appendix 1B. Since the composite samplers were not flow paced, they were programmed with a non-uniform time-weighted frequency to simulate the approximate flow characteristics. All samples were analyzed by FGL, Inc., located in San Luis Obispo.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Table 1.8 summarizes the results from the recommended sampling plan. The wastewater sampling data collected was generally found to be consistent during the sampling period except for a few data points.

Some of the anomalies were resolved by following up with FGL, Inc. The key findings from the wastewater sampling data analysis include:
 The influent CBOD and TSS concentrations during the sampling period were lower than the average historical data. This could likely be due to two possible reasons:
» The WWTP experienced lower incoming loads during the sampling period. » The influent samples were collected as flow-based composites during the sampling period, however, historically the influent samples have been collected as time-based composites.  The TSS concentrations in solids streams such as thickener underflow, digested sludge, and solids off hauled were also lower than the average historical data. This could again possibly be due to the lower incoming loads into the WWTP during the sampling period.  The average influent COD to BOD₅ ratio is about 2.6, which is high compared to the typical range of

1.8 to 2.2 for municipal wastewater. The higher ratio suggests the presence of industrial waste streams or other non-municipal components in the influent.
 The average particulate COD to VSS is about 2.0 which is high end of the typical range of 1.4 to 2.0.

The higher particulate COD to VSS also suggests the presence of industrial or other non-municipal components in the influent.
 The influent TKN and NH3-N averages around 64 and 51 mg/L, respectively. This results in a NH3-N to TKN ratio of 0.81 which is a little bit higher than the typical range of 0.5 to 0.75. Additionally, the presence of NO3-N and NO2-N at secondary trickling filter pump station and effluent suggests that some incidental nitrification is occurring in the process.  The soluble fraction for COD, BOD₅, and CBOD is in the range of 55 to 60 percent, which is higher than the typical range of 35 to 45 percent for municipal wastewater.  The primary clarifiers seem to be performing well within the typical range. The TSS and BOD₅ removal is approximately 64 and 36 percent, respectively compared to the typical TSS and BOD₅ removals of 55 to 65 percent and 25 to 35 percent, respectively.
 The primary trickling filters seem to be performing well based on the current organic loading excluding recycle flows.
» The CBOD removal is approximately 51 percent for PTF No. 1 based on the organic loading of 248 pounds (lbs) BOD/1,000 cubic feet (ft3)/day which is higher than the typical removal of 30 percent at the same organic loading.
» The CBOD removal is approximately 55 percent for PTF No. 2 based on the organic loading of 151 lbs BOD/1,000 ft3/day which is higher than the typical removal of 40 percent.  The intermediate clarifier provides about 13 percent TSS removal.  The secondary trickling filters seem to be performing below the typical based on the current organic loading. The CBOD removal is approximately 60 percent for the current organic loading of 43 lbs BOD/1,000 ft3/day which is a little bit lower than the typical removal of 70 percent at the same organic loading.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Table 1.8 Summary of Wastewater Sampling Plan Data
Sample Unit
Composite Samples(1)(2) Grab Samples(1)
Influent
Grit
Chamber
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
Primary
Trickling
Filter
Pump
Station
Primary
Trickling
Filter No. 1
Effluent
Primary
Trickling
Filter No. 2
Effluent
Intermediate
Clarifier
Effluent
Secondary
Trickling
Filter Pump
Station
Secondary
Trickling
Filter No. 1
Effluent
Secondary
Trickling
Filter No. 2
Effluent
Effluent Primary
Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow Digester Drying Bed Supernatant
Solids
Off-Hauled(3)
Field Measurements
Flow mgd 6.6(3)
Temperature degrees Celsius 21 18.7 34.6
pH 7.6 7.8 7.0
Gas Flow scfm -- 14(3)
Unfiltered
COD mg/L 915 1,001 610 390 418 382 392 326 280 201 209 165 703 1,339 BOD mg/L 358 146 101 66
CBOD mg/L 329 326 200 141 132 115 104 70 49 49 29 235 180 TSS mg/L 232 296 168 61 71 91 87 79 55 62 56 28 2,857 746 2,126 35,714 323 15,714 51 -- VSS mg/L 210 61 70 86 87 55 59 55 2,536 693 1,926 31,629 12,414 -- TKN mg/L 64
TP mg/L 10.8 8.7
Alkalinity mg/L CaCO3 354 386 346 310 18,833
Filtered(3)
sCOD mg/L 491 476 323 270 287 236 222 182 113
sBOD mg/L 209 90 39 18
sCBOD mg/L 195 93 54 53 36 17
sTKN mg/L 53 --
Ortho-P mg/L 5.1
Filtered(4)
NH3-N mg/L 51 55 45 40
NO3-N mg/L 0.2 0.1 1.3 3.3
NO2-N mg/L 0.0 0.03 1.3 2.4
TN mg/L 54 48 43
Flocculated/Filtered(5)
ffCOD mg/L 262
Notes:
(1) Average of one-week sample period (December 13 through 19, 2023). (2) Composite samples were time-based on December 13 and 14, and flow-based from December 15 to 19. (3) Based on routine sampling.
(4) Filtered through 1.2 to 1.5 micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45 micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with deionized water. (6) Sample preparation per Mamais et al., 1993.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
 The VSS to TSS ratio was consistent for primary sludge and was approximately 90 percent. However, there was a lot of variation in the TSS and VSS data for the sampling period.  The VSS to TSS ratio was also consistent for thickened sludge and was approximately 90 percent. The TSS and VSS data were mostly consistent for the sampling period except for one day (December 13, 2023).
 The VSS to TSS ratio was also consistent for digested sludge and was approximately 75 percent. The TSS and VSS data were fairly consistent throughout the sampling period.

The results from the wastewater sampling were used to evaluate performance and develop unit process ratings discussed in Section 1.4.5 and calibrate a process model discussed in Section 1.5.

1.4.5 Unit Process Evaluation
An understanding of the WWTP's unit process performance is critical to evaluating WWTP's performance.

The historical load and performance of each unit process was compared to the original design criteria and typical anticipated performance. The performance of each unit process provides a benchmark for the planning of new facilities and assessing capacity. Table 1.9 summarizes the results of the performance evaluation for City’s WWTP based on the historical as well as additional data collected during the wastewater sampling event. The rest of this section provides a focused discussion of the operating conditions and performance for the primary, secondary, and solids handling processes.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
Table 1.9 Unit Process Performance
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Influent Flow
AA, mgd 12.5 O&M Manual 7.3 Variable Projections to be developed MM, mgd 13.5 O&M Manual 8.1 Variable Projections to be developed PH, mgd 24.0 O&M Manual To be developed after receiving hourly data Variable Projections to be developed Primary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 379 O&M Manual 224 800 - 1,200 379 Overflow Rate at AA Flow With Recirculation,
gpd/ft2
925 O&M Manual 694 800 - 1,200 925
BOD5 Percent Removal 36 O&M Manual 30 30 - 35 30
TSS Percent Removal 54 O&M Manual 64 60 - 65 64
PTFPS
Flow Rate, mgd 19.5 O&M Manual 19.5 Variable 19.5
PTF No. 1
Flow Rate, mgd 11.7 O&M Manual 11.7 Variable 11.7
Hydraulic Loading, gpm/ft2 2.9 O&M Manual 2.9 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

2.9 Recirculation Ratio at AA Flow 0.67 O&M Manual 0.67 Variable, hydraulic and organic loading more critical

0.67 BOD5 Loading, lbs/1,000 ft3/day 385 with recycle
365 without recycle
O&M Manual 380 with recycle
248 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
248
Distributor Rotational Speed, secs/rotation 30 - 60 O&M Manual 45 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 30 - 60 Calculated based on Distributor Rotation and Flow Rate
45 Depends on BOD5 Loading, 200 -
600 mm/rotation recommended for BOD5
loading 200 lbs/1,000 ft3/day
200
Performance for BOD5 Removal, % 35 with recycle
55 without recycle
O&M Manual 13 with recycle
51 without recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
51 PTF No. 2
Flow Rate, mgd 7.8 O&M Manual 7.8 Variable 7.8
Hydraulic Loading, gpm/ft2 1.9 O&M Manual 1.9 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

1.9 Recirculation Ratio at AA Flow 1.0 O&M Manual 1.0 Variable, hydraulic and organic loading more critical

1.0 BOD5 Loading, lbs/1,000 ft3/day 255 with recycle
250 without recycle
O&M Manual 253 with recycle
151 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
151
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Distributor Rotational Speed, secs/rotation 60 O&M Manual 150 (July 19-20, 2023, visit) Variable 240 SK, mm/rotation 40 Calculated based on Distributor Rotation and Flow Rate
100 Depends on BOD5 Loading, 200 -
600 mm/rotation recommended for BOD5
loading 200 lbs/1,000 ft3/day
150
Performance for BOD5 Removal, % 35 with recycle
74 without recycle
O&M Manual 21 with recycle
55 without recycle
40 - 70% BOD5 Removal (Roughing)
< 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
55 Intermediate Clarifier
Flow Rate, mgd 3.6 O&M Manual 3.5 Variable 3.5
Nominal Overflow Rate at AA Flow, gpd/ft2 935 O&M Manual 909 800 - 1,200 909 STFPS
Flow Rate, mgd 23 O&M Manual 23 Variable 23
STFs
Hydraulic Loading, gpm/ft2 0.31 O&M Manual 0.31 1 - 3 (Roughing)

0.3 - 1.5 (CBOD and Nitrifying)

0.31 Recirculation Ratio at AA Flow 0.46 O&M Manual 0.68 Variable, hydraulic, and organic loading more critical

0.46 BOD5 Loading, lbs/1,000 ft3/day 111 with recycle
75 without recycle
O&M Manual 73 with recycle
43 without recycle
75 - 300 (Roughing)
20 - 75 (Carbon Oxidizing)
5 - 20 (CBOD and Nitrifying)
< 10 (Nitrifying)
43 Distributor Rotational Speed, secs/rotation 150 - 180 O&M Manual 150 (July 19-20, 2023, visit) Variable 480 SK, mm/rotation -- -- 15 - 20 Depends on BOD5 Loading, 100 - 300 mm/rotation recommended for BOD5
loading 100 lbs/1,000 ft3/day
50 Performance for BOD5 Removal, % 56 without recycle -- 60 without recycle 40 - 70% BOD5 Removal (Roughing) < 30 mg/L (Carbon Oxidizing)
< 10 mg/L (CBOD and Nitrifying)
60 Secondary Clarifiers
Nominal Overflow Rate at AA Flow, gpd/ft2 400 O&M Manual 240 400 - 800 400 Overflow Rate at AA Flow with Recirculation,
gpd/ft2
750 O&M Manual 750 800 - 1,200 750
Gravity Thickeners
Hydraulic Loading, gpd/ft2 462 O&M Manual 338 500 - 750 462 Solids Loading, lbs BOD5/1,000 ft2/day 24 O&M Manual -- 12 - 20 12 - 20 Solids Loading, lbs TSS/ft2/day 14.2 -- 9.3 <22 9.3
Thickened Sludge TSS, % 6.5 O&M Manual 4.5 5 - 9 4.5
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
Process/Parameter Original Design Capacity or Rating Source Average Performance From 2018 - Present(1) MOP 8(2) or Typical Values Recommended Operation for Performance Assessment
Digesters
HRT, days 20 O&M Manual 20.5 15 day minimum for single-stage mesophilic digesters (Class B)
20 Percent TS -- -- 2.3 1.5 - 2.5 Developed for Capacity Evaluation Percent VS -- -- 1.6 1.0 - 1.7 Developed for Capacity Evaluation VSS Loading, lbs/ft3/day 0.10 - 0.15 O&M Manual 0.12 0.15 - 0.20 0.15 - 0.20 VS Reduction, % 55% O&M Manual 58 Minimum 38 percent for Class B Minimum 38 percent for Class B Volatile Acids, mg/L 50 - 500 O&M Manual 147 500 Maximum 500 Maximum Alkalinity, mg/L as CaCO3 1,500 - 3,000 O&M Manual 3,404 1,500 - 5,000 1,500 - 5,000 Volatile Acids/Alkalinity Ratio -- -- 0.043 0.10 - 0.35 0.10 - 0.35 pH 6.8 - 7.4 O&M Manual 7.0 6.8 - 7.2 6.8 - 7.2
Gas Production, ft3/day -- -- 151,000 Variable Variable Gas Production, ft3/lb VS removed 12 - 17 O&M Manual 16.3 12 - 18 12 - 18 Sludge Drying Beds
Solids Loading, lbs/day 15,700 O&M Manual 11,000 Variable 15,700 Solids Loading, lbs/ft2/year 10.9 O&M Manual 7.6 15 to 25 (typical) 11 Solids Off Hauled From Beds (Wet
Tons/year)
-- -- 19,660 Variable --
Percent TS Off Hauled 60% O&M Manual 70% reported 50 to 90% 70 Notes:

CaCO₃ - calcium carbonate; HRT - hydraulic residence time; mm - millimeter; PTFPS - primary trickling filter pump station; TS - total solids; VS - volatile solids (1) Includes data through September only.
(2) Design of Water Resource Recovery Facilities, MOP8.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19

1.4.5.1 Primary Treatment
The primary treatment system includes both clarification and biological treatment. Primary clarifiers remove settleable solids and floatable from wastewater through quiescent conditions that allow sedimentation of heavier particles (sludge) and flotation of lighter solids (scum). Effluent from both primary clarifiers is pumped to both PTFs through the PTFPS. When influent flows to the plant are above

3.9 mgd, the total primary clarifier effluent will exceed 19.5 mgd. The excess flow to the PTFPS falls over a weir, mixes with intermediate clarifier effluent, and then flows to the secondary treatment process. The settled primary sludge is pumped to the gravity thickeners.

Primary Clarifiers
Following preliminary treatment, the primary influent flow is combined with recycle flow from the PTFs in the mixing box at the outlet end of the grit chamber. The primary influent also includes sludge from the intermediate and secondary clarifiers, which are returned to Junction Box C upstream of the grit chamber.

The settled primary sludge is moved inward toward the sludge pocket in the clarifier bottom by two rows of angled scrapers, one row mounted on each arm of the continuously rotating clarifier sweep mechanism. The primary sludge is withdrawn continuously by the primary sludge pumps which transfer it to the gravity thickeners.

Surface overflow rate (SOR) is a key parameter used for design and assessment of primary clarifiers.

Figure 1.8 shows the SOR for the primary clarifier at WWTP for the evaluation period. SOR for primary clarifiers was calculated using the average daily flow for the evaluation period and a constant recycle flow of 16 mgd. As seen in Figure 1.8, the SOR for primary clarifiers is below the average design value and well within the typical SORs for primary clarifiers. The average CBOD and TSS removal during the sampling period was 30 and 64 percent, respectively. The performance of the primary clarifier is also well within the typical range of 30 to 35 percent CBOD and 60 to 65 percent TSS removal.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Figure 1.8 Surface Overflow Rates for Primary Clarifiers Primary Trickling Filters
Both primary clarifiers discharge effluent through a common pipe to the PTFPS wet well. The pumping rate for PTF No. 1 is 11.7 mgd and for PTF No. 2 is 7.8 mgd. A portion of the flow from PTF No. 1 goes to an Intermediate Clarifier, discussed below, and the remainder is recycled, together with all flow from PTF No. 2.

The distributed wastewater trickles slowly down through the 12-foot depth of plastic media. The type of plastic media is not indicated in the O&M manual, although most plastic media for this type of filter would be a vertical configuration.

The trickling filters are typically characterized based on three parameters: BOD₅ removal efficiency, hydraulic loading, and organic loading. Both PTF No. 1 and PTF No. 2 have very high hydraulic and organic loadings (2.9 and 1.9 gpm/ft2; and 385 and 285 lbs BOD₅/1,000 ft3/day respectively) based on the design criteria and are therefore classified as “roughing” filters. Note that the organic loadings in the design criteria are calculated including recycle. The rotational speed for the distributor arm results in a SK value ranging from 45 to 100 mm/rotation. This is a measure of the amount of water applied per 1 revolution of the distributor arm. For trickling filters operating at such a high loading rate, a minimum SK value of 200 to 600 mm/rotation is recommended to maintain healthy biology. With too low of a SK alue, the trickling filter may be more susceptible to experiencing poor hydraulic distribution and flushing, which could result in septic conditions within the unit. Increasing the SK value can be achieved by reducing the rotational speed of the distributor.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
The filters are designed to achieve 35 percent BOD₅ removal and no nitrogen removal. Based on the wastewater sampling, the organic loading excluding recycle for PTF No. 1 and No. 2 is 248 and 151 lbs BOD₅/1,000 ft3/day, respectively. The organic loading with recycle for PTF No. 1 and No. 2 is 380 and 253 lbs BOD₅/1,000 ft3/day. The average CBOD removal for PTF No. 1 and No. 2 from the sampling plan is 51 and 55 percent, respectively.

Intermediate Clarifier
The Intermediate Clarifier is unique in that it only receives flow from PTF No. 1 and is the only clarifier at this treatment plant which does not have scum collection or removal equipment. All floatable material, which may be present in the intermediate clarifier will pass over the effluent weir and ultimately be removed in the secondary clarifiers.

Up to 3.9 mgd of the effluent from PTF No. 1 is sent to the intermediate clarifier to remove settleable solids. The clarified effluent from the intermediate clarifier flows through a 24-inch pipe to a small box at the outlet side of the PTFPS, where it is combined with the portion of the primary clarifier effluent which has not been pumped to either PTF.

The intermediate clarifier provides only 13% TSS removal and therefore, it is not performing well. As mentioned, this is probably as a result of the poor settling characteristic of the primary trickling filter solids.

1.4.5.2 Secondary Treatment
The secondary treatment system consists of two STFs, two secondary clarifiers, a STFPS, secondary pump station, and percolation ponds. Secondary treatment is a biological process that removes CBOD and TSS from the wastewater to meet regulatory requirements. Based on the O&M manual, at the end of the secondary process, more than 80 percent of the CBOD and TSS in the raw wastewater have been removed. The plant effluent is then discharged to percolation ponds, where the water is returned to the groundwater basin.

Secondary Trickling Filters
The STFs receive flow from the STFPS. The feed is a mixture of bypass flow from the PTFPS and overflow from the Intermediate Clarifier. The flow is distributed evenly over both STFs through rotary distributor arms. The filters are filled with modular plastic cross-flow media at a depth of 3.33 feet. As water flows through the filter media, biological organisms growing on the media draw remaining organic material from the wastewater and convert it to settleable solids.

To maintain the required wetting rate on the STFs, a portion of the secondary clarifier effluent is recycled to the pump station. The amount of recycled secondary effluent decreases as primary effluent flow increases.

With a design hydraulic loading rate of 0.31 gpm/ft2 and an organic loading rate (including recycle) of 111 lbs BOD₅/1,000 ft3/day, the STFs (like the PTFs) are classified in the high-rate range. The current hydraulic loading for the STFs is estimated to be 0.33 gpm/ft2, which is on the low range of the recommended hydraulic loading rate. Insufficient wetting rates could result in poor hydraulic distribution within the media, and reduced performance. The secondary distributors rotate at 2.5 to 3 minutes per revolution, which results in a SK value of 15 to 20 mm/rotation. At the design organic loading rate, the TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
recommended SK value is 100 to 300 mm/rotation. Like the PTFs, the secondary filters may benefit from reducing the distributor rotational speed.

The average organic loading (excluding recycle) for STFs is 43 lbs BOD₅/1,000 ft3/day and the average CBOD removal (excluding recycle) is 60 percent.

Secondary Clarifiers
The secondary clarifiers provide quiescent conditions for the sludge to settle and scum to float to the surface. Secondary clarifier effluent flow that is not recirculated back to the STFs is discharged to the percolation ponds. Settled secondary sludge or scum collected in the secondary clarifiers is pumped back to upstream of the grit chambers. The secondary clarifiers are operating at their design SOR rate of 750 gpd/ft2 (including recirculation), which is well within typical rates for clarifiers.

The secondary clarifiers are shallow with a depth of 10 ft. Typical depth for secondary clarifiers range from 14 to 16 ft. The shallow secondary clarifiers are suitable for a two-stage trickling filter process since the solids loading is typically lower than an activated sludge process.

1.4.5.3 Solids Handling
The solids handling system includes sludge and scum pumping, sludge thickening, sludge digestion, digested sludge settling, drying, and disposal. The purpose of the gravity thickeners is to receive all sludge pumped from the primary clarifier and provide quiescent conditions during which the sludge and scum will thicken until a concentration of solids is reached which is suitable for addition to the digesters, typically in the 3 to 5 percent range.

The purpose of the digesters is to retain the digesting sludge under anaerobic conditions for a minimum period in order to stabilize the biosolids sufficiently for disposal.

Gravity Thickeners
The gravity thickeners receive all the sludge pumped from the primary clarifiers. Gravity thickeners are evaluated based on hydraulic loading and solids loading. The current hydraulic loading rate for the gravity thickeners is approximately 338 gpd/ft2 compared to the design hydraulic loading rate of 462 gpd/ft2. The design organic loading rate is 24 lbs BOD₅/ft3/day. The thickened sludge is pumped to the digesters and the clarified thickener overflow is returned to the PTFPS.

Figure 1.9 shows the thickened sludge flow which is pumped to the digesters and Figure 1.10 shows the percent TS for thickened sludge during the evaluation period. The target percent TS for thickened sludge is 6.5 percent. However, for the evaluation period, the average percent TS for thickened sludge is about

4.5 percent as shown in Figure 1.10. While the overflow rate is below the design value and within typical rates for a thickener. The solids loading rate is approximately 9.3 lbs TSS/ft2 /day, which is below the
design rate of 14.2 lbs/ft2/day and well below the maximum loading rate of 22 lbs TSS/ft2/day.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.9 Thickened Sludge Flow Rate
Figure 1.10 Thickened Sludge Total Solids Concentration TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
Digesters
The anaerobic digestion of sludge by bacteria is a sequential process. The first stage is acid fermentation, and the second stage is methane fermentation. The organic acids produced during acid fermentation are subsequently utilized by bacteria resulting in release of methane and carbon dioxide gas. Both stages occur in the single stage mesophilic digesters operated by the City.

Stabilization of the sludge is accomplished during the methane fermentation stage. In this stage, the organic acids produced during acid fermentation are converted to methane and carbon dioxide resulting in a reduction of the organic material in the system.

VS loading and the HRT are key parameters used for assessing performance. The design HRT for the digesters at the WWTP is about 20 days. For the evaluation period, only two out of four digesters were in operation (No. 1 and No. 3). The average HRT for Digesters No. 1 and No. 3 is similar and approximately 20 days. Figure 1.11 shows the daily average HRTs for Digesters No. 1 and No. 3. While the average is above the regulatory required minimum HRT of 15 days to achieve a Class B biosolids, there are periods where the HRT approaches 15 days. This likely due to the lower percent solids of the thickened feed from the gravity thickeners (4.5 percent versus 6.0 percent).

Figure 1.11 Anaerobic Digester Hydraulic Retention Time VS loading rate for the evaluation period was about 0.12 lbs/ft3/day as shown in Figure 1.12. Typical values for VSS loading ranges from 0.12 to 0.16 lbs/ft3/day. The VSS loading is below the recommended maximum range of 0.15 to 0.20 lbs/ft3/day.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
Figure 1.12 Anaerobic Digester Volatile Solids Loading Rate Apart from the HRT and VSS loading, other operational parameters used to assess their health are illustrated in Figure 1.13 through Figure 1.19 below. In general, all of the parameters evaluated indicate the digesters are performing well and within their design and typical values. The typical maximum operating range for all the parameters is shown in the grey shaded zone.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
Figure 1.13 Anaerobic Digester pH
Figure 1.14 Anaerobic Digester Volatile Acids
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
Figure 1.15 Anaerobic Digester Alkalinity
Figure 1.16 Anaerobic Digester Gas Production
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
Figure 1.17 Anaerobic Digester Temperature
Figure 1.18 Anaerobic Digester Volatile Solids Reduction TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
Figure 1.19 Anaerobic Digester Volatile Acids/Alkalinity Ratio Sludge Drying Beds
Digested sludge is transferred from the digesters to drying beds. Each of the sludge beds is equipped with overflow rings that are used to decant clear liquid from the beds back to the decant pump at Supernatant Pit No. 1. By decanting clear liquid, the drying time in the bed can be reduced. The City’s WWTP has about 18 drying beds that cover 12 acres of land. The design solids loading rate is

10.9 lbs/ft2/year. Based on the reported digested sludge quantity and characteristics, the average solids loading during the review period is calculated to be 7.6 lbs/ft2/year and should have capacity to accommodate more sludge. Note that during wet years, the available capacity may be less. Reported TS concentration off hauled from the drying beds is 70 percent.

1.5 Process Modeling
A steady state plant wide model was developed using BioWin version 6.2 (Envirosim) to help evaluate the current performance, near-term recommendations, establish unit process capacity, and evaluate future nitrogen removal alternatives. Figure 1.20 shows a process flow schematic developed in BioWin for the WWTP.

The model was developed using custom-configured unit process modules that reflect the existing configuration and operation at the City’s WWTP. Physical dimensions (volume, area, and depth) of each unit process and flow rates for all process streams were used as inputs for the model. Historical operational data and data collected from the wastewater sampling plan were used to calibrate the model.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30
Figure 1.20 Process Model for City’s WWTP
The BioWin model utilizes COD modeling which uses influent COD data as an input as well as various COD fractions such as readily biodegradable, acetate, non-colloidal slowly biodegradable, unbiodegradable soluble, and unbiodegradable particulate. Constituents such as CBOD and TSS are calculated based on the influent COD and specified wastewater fractions.

Based on the sampling plan data, the COD to BOD₅ and COD to CBOD ratio in the influent was higher than the typical range for municipal wastewater. Therefore, three different process modeling approaches were used to match the influent wastewater characteristics and current plant performance.

The first approach focused on matching the influent COD concentrations while modifying wastewater fractions calculated from the sampling plan only. Since the COD to CBOD ratio during the sampling period was higher than the typical range, it was difficult to match the influent CBOD for this approach without calibrating additional parameters.

The second approach focused on matching influent COD, CBOD, and TSS concentrations while modifying wastewater fractions calculated from the sampling plan as well as additional parameters to help calibrate the influent wastewater characteristics and current plant performance. This approach provided a good match on the influent and secondary trickling filter performance; however, it didn’t provide a good match for the primary trickling filter performance. This approach provided an insight into the overall performance of the City’s WWTP. Based on the sampling plan results and model prediction results from approach 2 it was concluded that the primary trickling filters are performing better than their design values while the secondary trickling filters are performing worse than their design values.

To mimic the above conclusion, the third approach focused on matching the primary and secondary trickling filter performance by modifying the specific area for both primary and secondary trickling filters which directly affects the performance of the trickling filters.

The calibrated parameters for each of the approaches are listed in Table 1.10.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
Table 1.10 Process Model Calibration Parameters
Parameter Default / Design Approach 1 Approach 2 Approach 3 Fbs - readily biodegradable COD (including
acetate)

0.16 0.35 0.35 0.35
Fus - unbiodegradable soluble 0.05 0.1 0.1 0.1
Fna - ammonia 0.66 0.81 0.81 0.81
Fpo4 - phosphate 0.50 0.48 0.48 0.48
Particulate COD:VSS 1.63 2.00 2.00 2.00
BOD calculate rate constant for Xsc degradation 0.5 0.5 0.1 0.1 BOD calc rate constant for Xsp degradation 0.5 0.5 0.1 0.1 PTF No. 1 Specific Area, ft2/ft3 27 27 27 105
PTF No. 2 Specific Area, ft2/ft3 42 42 42 85
STF No. 1 and No. 2 Specific Area, ft2/ft3 42 42 42 18
Table 1.11 provides the model outputs for each of the three approaches. As described earlier, approaches 1 and 2 do not match the primary trickling filter performance and approach 3 matches the overall plant performance. A few observations worth noting from model calibration are:
 For approach 2, the BOD rate constants had to be modified significantly. The BOD rate constant account for BOD inhibition due to additional non-municipal influent load?  Approach 2 matches the sampling period data for most of the key process streams and parameters except for PTF No. 1 and No. 2 effluent.
 For Approach 3, the specific areas for PTFs and STFs had to be modified significantly to match the performance.
 Approach 3 matches the sampling period data the best (<10% difference) for key process streams and parameters.
 For each of the approaches the model predicted higher total solids (lbs/day) loading for sludge thickeners and anaerobic digesters compared to the data collected from the sampling plan. However, when compared to the historical data, the thickened sludge and digested sludge data better matches the model outputs. Since the primary, thickened, and digested sludge samples were analyzed as grab samples, it is possible that the data collected from the sampling period is not representative of the actual total solids loading. Furthermore, both primary, thickened, and digested sludge data showed a lot of variation during the sampling period.

The process model was used to evaluate the benefit of improving primary and secondary clarifier performance. For the purposes of this evaluation, either Approach 2 or 3 could be used to determine the benefits of different optimization elements as they predict the same relative improvements. The results from various recommended optimization elements are described in Section 1.6.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Table 1.11 Process Model Calibration Summary
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Influent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 915 915 915 915
CBOD, mg/L 317 447 320 320
TSS, mg/L 232 249 243 243
TKN, mg/L 64 64 64 64
Grit Chamber Influent
Flow, mgd 7.23 7.23 7.23 7.23
COD, mg/L 1,001 1,004 1,026 993
CBOD, mg/L 326 500 367 349
TSS, mg/L 296 369 349 323
Grit Chamber Effluent
Flow, mgd 23 23 23 23
COD, mg/L 610 642 626 538
CBOD, mg/L 200 305 239 180
TSS, mg/L 168 184 170 174
Primary Effluent
Flow, mgd 23 23 23 23
COD, mg/L 390 465 459 368
CBOD, mg/L 141 228 194 133
TSS, mg/L 61 68 63 64
CBOD Removal, % 30 27 21 28
TSS Removal, % 64 64
PTFPS
Flow, mgd 23 23 23 23
COD, mg/L 418 481 465 374
CBOD, mg/L 132 236 361 268
TSS, mg/L 71 78 67 68
PTF No. 1 Effluent
Flow, mgd 11.7 11.7 11.7 11.7
COD, mg/L 382 472 457 350
CBOD, mg/L 115 225 188 110
TSS, mg/L 91 91 80 100
CBOD Removal, % 51 55 35 56
Organic Loading, lbs BOD₅/1,000 ft3/day 248 244 309 267 TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 PTF No. 2 Effluent
Flow, mgd 7.8 7.8 7.8 7.8
COD, mg/L 392 448 432 314
CBOD, mg/L 104 209 174 96
TSS, mg/L 87 109 98 113
CBOD Removal, % 55 43 40 62
Organic Loading, lbs BOD₅/1,000 ft3/day 151 148 126 86
Intermediate Clarifier Effluent
Flow, mgd 3.4 3.4 3.4 3.4
COD, mg/L 326 465 449 341
TSS, mg/L 79 87 75 94
TSS Removal, % 13 9 10 10
STFPS
Flow, mgd 21 21 21 21
COD, mg/L 280 262 255 222
CBOD, mg/L 70 98 82 59
TSS, mg/L 55 52 47 45
STF No. 1 and No. 2 Effluent
Flow, mgd 21 21 21 21
COD, mg/L 205 216 208 198
CBOD, mg/L 49 60 50 45
TSS, mg/L 59 81 75 58
CBOD Removal, % 60 74 74 63
Organic Loading, lbs BOD₅/1,000 ft3/day 43 80 35 42
Effluent
Flow, mgd 6.6 6.6 6.6 6.6
COD, mg/L 165 156 153 154
CBOD, mg/L 29 32 27 28
TSS, mg/L 28 37 34 27
NH3-N, mg/L 37 48 48 49
NO3-N, mg/L 2.4 0 0 0
NO2-N, mg/L 3.3 0 0 0
TIN, mg/L
Primary Sludge
Flow, mgd 0.65 0.65 0.65 0.65
TSS, mg/L 2,857 4,198 3,880 3,977
TSS, lbs/day 15,489 22,760 21,032 21,560
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
Parameter Sampling Plan Data Approach 1 Approach 2 Approach 3 Thickener Underflow
Flow, mgd 0.06 0.06 0.06 0.06
% TS 3.6 4.5 4.4 4.5
TS, lbs/day 17,871 22,346 21,797 22,344
Digested Sludge
Flow, mgd
% TS 1.6 2.2 2.1 2.2
TS, lbs/day
% VS 0.69 0.76 0.79 0.79
HRT, days 19 19 19 19
VS Removed, % 58 58 58 58
VS Removed, lbs/day 10,406 10,540 10,575 10,861
Gas, scfm 79 131 133 133
Gas, scf/lbs VS Removed 17 18 18 18
Solids to Beds
TS, lbs/day 10,204 9,669 9,883
Solids Off-Hauled from Beds
TS, lbs/day 9,694 9,476 9,685

1.6 Optimization Elements
Based on the performance assessment and several conversations with the City, effluent CBOD has increased in 2023 and brought the City very close to exceeding the monthly CBOD limit. This section summarizes preliminary results of the performance assessment and various optimization elements for improving the performance of the existing system.

1.6.1 Influent Loading
While the influent loading is still within the plant’s original design basis, concentrations are significantly higher than the original design. In addition, higher flows the last two years have resulted in a significant increase in influent loads. While the source of the loading increase is not known (i.e., growth, increased septage, or increased landfill leachate), increased loadings on a fixed film process generally result in lower BOD₅ removal rates. The team should better characterize the loading impact of septage and leachate to determine if this is a contributing factor in recent performance changes. If so, the City may want to consider reducing or eliminating septage or leachate.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35

1.6.2 Primary Clarifiers
Reduced performance increases the solids loading on the PTFs, which can reduce their BOD₅ removal efficiency. Although, as mentioned in previous sections, primary clarifier performance is well within the typical range for both CBOD and TSS removals. However, improving the primary clarifier performance would reduce organic loading on both PTFs and STFs and therefore, reduce CBOD and TSS concentrations in the effluent. The process model was used to analyze the benefit of improving primary clarifier performance. Figure 1.21 shows the reduction in effluent CBOD and TSS concentrations with improved primary clarifier performance. However, the modeling results should be confirmed with jar testing.

Recently conducted jar testing indicates that ferric chloride addition can reduce the BOD₅ and TSS loading on the PTFs.

Figure 1.21 Primary Clarifier Performance Improvement

1.6.3 PTFs
The PTFs are very highly loaded and have a design organic loading of 255 to 385 lbs BOD₅/1,000 ft3/day.

This is higher than the typical range of 100 to 300 lbs BOD₅/1,000 ft3/day for roughing filters. A potential area of optimization would be to modify the distributor arm operation. If the trickling filter distributor arm is rotating too quickly, hydraulic short-circuiting can occur and biomass growth may not be adequately flushed, which can contribute to septicity and reduced performance. A preliminary review of the SK values based on the design organic loading indicates the distributors on the PTFs are rotating much faster than typical recommended rates.

Based on the wastewater sampling event, the organic loading for PTF No. 1 and No. 2 is 248 and 151 lbs BOD₅/1,000 ft3/day. The recommended SK values for PTF No. 1 is 200 to 600 mm/pass and for TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
PTF No. 2 is 150 to 450 mm/pass. Based on the recommended values, the distributor rotation time for PTF No. 1 and No. 2 is approximately 4 minutes. Additionally, for proper flushing, the recommended distributor rotation time for PTF No. 1 and No. 2 is approximately 11 minutes and the recommended daily flushing time is an hour. Detailed calculations for recommended distributor rotation times are shown in Appendix 1C. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.

1.6.4 STFs
The STFs are designed with an organic loading of 111 lbs BOD₅/1,000 ft3/day, which is more lightly loaded than the PTFs. Similar to the PTFs, the distributors on the STFs are rotating much faster than typical recommended rates.

Based on the wastewater sampling event, the organic loading for STF No. 1 and No. 2 is 40 lbs BOD₅/1,000 ft3/day. The recommended SK values for STF No. 1 and No. 2 is 50 to 150 mm/pass.

Based on the recommended values, the distributor rotation time for STF No. 1 and No. 2 is approximately 8 minutes. Additionally, for proper flushing, the recommended distributor rotation time for STFs No. 1 and No. 2 is approximately 23 minutes and the recommended daily flushing time is an hour. Detailed calculations for recommended distributor rotation times are shown in Appendix 1C. To optimize performance, the rotational speed can be reduced by adding braking nozzles on the hydraulic drives or replacing the hydraulic drives with motorized units.

The wetting rate for the STFs is 0.3 gpm/ft2, which is on the low end of what is typically recommended for this type of filter (0.3 to 1.5 gpm/ft2). Increasing the feed pumping rate and the wetting rate may improve flushing, oxygen transfer, and overall performance.

1.6.5 Secondary Clarifiers
Since a portion of the effluent BOD5 is particulate, improving clarifier performance should reduce effluent BOD5 too. Based on the wastewater sampling results, the average CBOD and TSS removal is 40 and 55 percent. The secondary clarifier performance can be improved which will help reduce the effluent BOD₅ concentration. The process model was utilized to analyze the benefits of improving secondary clarifier.

Figure 1.22 shows the reduction in effluent CBOD and TSS concentrations with improved secondary clarifier performance.

The City should consider the addition of a suitable polymer ahead of the secondary clarifiers to help reduce effluent TSS and CBOD concentrations. However, the modeling results should be confirmed with jar testing. Preliminary jar testing results showed floc formation and improved settleability. Additional pilot testing might help confirm the benefits.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37
Figure 1.22 Secondary Clarifier Performance Improvement

1.6.6 Gravity Thickeners
Reduced thickener performance (i.e., poor solids capture) may result in a large amount of solids in the supernatant, which could adversely affect liquid stream performance. The thickened sludge concentration is lower than the design target and typical ranges. Optimizing performance and increasing the thickened sludge concentration can translate to additional digester capacity, if needed.

1.7 Recommendations and Next Steps
If the proposed optimizations in this section do not result in improved effluent quality, the City will need to consider other more capital-intensive alternatives. Potential improvements could include:
 Replace trickling filter media.
 Construct another trickling filter.
 Modify process with the addition of aerated solids contact tanks to improve settleability and clarifier performance and reduce effluent suspended solids, including particulate BOD5.  Add tertiary effluent filters.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1A DESIGN CRITERIA
1A-1
Table 1A.1 Design Criteria
Item Values
Flows, mgd AA 12.5 MM 13.5 PH 24.0
Septage Contribution
Flow, gpd 65,000
BOD₅, mg/L 8,000
TSS, mg/L 13,500
Influent Loading
BOD₅
AA, mg/L 317
AA, lbs/day 33,050
MM, mg/L 346
MM, lbs/day 39,000
TSS
AA, mg/L 322
AA, lbs/day 33,600
MM, mg/L 380
MM, lbs/day 42,800
Primary Clarifiers
Number2
Diameter, feet 145
Depth, feet 10
Area, each, ft
2 16,505
Total Area, ft
2 33,009
Nominal SOR at AA Flow, gpd/ft
2 379
SOR with recycle, gpd/ft
2 925
Primary Effluent BOD
5 at AA Flow, lb
s/day 21,704
BOD
5 Removal, % 34.33%
Primary Sludge Pumping, gpm 300 PTFs
Number 2
Diameter, feet 60
Depth, feet 12
Media ft
2 /ft
3 25
Media type plastic
Area, each, ft
2 2,826
Area, total, ft
2 5,652
Media Volume, each, ft
3 33,912
Media Volume, total, ft
3 67,824
1A-2
Item Values
PTF No. 1
Pumped Flow, mgd 11.7
Hydraulic Loading, gpm/ft
2 2.9
lbs BOD₅/1,000 ft
3 /day 385.0
Influent BOD
5, lb
s/day 13,056
Influent BOD
5, mg/L 133.8
PTF No. 2
Pumped Flow, mgd 7.8
Hydraulic Loading, gpm/ ft
2 1.9
lbs BOD₅/1,000 ft
3 /day 255
Influent BOD
5, lb
s/day 8,648
Influent BOD
5, mg/L 133
Intermediate Clarifier
Number1
Flow, mgd 3.6
Overflow Rate, gpd/ft
2 935
Area, ft
2 3,850
Diameter, feet 70
Detention Time, hours2
Depth, feet 10
Sludge Pumping Rate, gpm 100
STFs
Number2
Diameter, feet 180
Depth, feet3
Media, ft
2 /ft
3 31
Media Type cross-flow
Area, each, ft
2 25,434
Area, total, ft
2 50,868
Media Volume, each, ft
3 84,695
Media Volume, total, ft
3 169,390
Pumped Flow, each, mgd 12
Hydraulic Loading, gpm/ft
2 0.31
Organic Loading, lbs BOD₅/1,000 ft
3 /day 111
Influent BOD
5, lb
s/day 5,646
Influent BOD
5, mg/L 29
Secondary Clarifiers
Number2
Diameter, feet 140
Area, each, ft
2 15,386
Area, total, ft
2 30,772
SOR, gpd/ ft
2 747
Depth, feet 10
1A-3
Item Values
Secondary Sludge Pumping, gpm 300
Design Percent TSS 0.50%
Sludge Thickeners
Number 2
Diameter, feet 35
Depth, feet 13
Area, each, ft2 962
Detention Time, hours 5
Hydraulic Loading, gpd/ft2 462
Solids Loading, lbs BOD₅/ ft3/day 24
Target Thickened Sludge, Percent TS 6.50%
Digesters
Number 1
Diameter, feet 65
Depth, feet 26
Volume, ft3 92,876
Number 2
Diameter, feet 50
Depth, feet 24
Volume, ft3 47,112
Number 1
Diameter, feet 65
Depth, feet 23
Volume, ft3 82,300
Total Volume 1-4, ft3 269,400
Total Volume Largest Out of Service, ft3 176,524
VSS Loading 0.15 to 0.20
Hydraulic Detention Time (days) 20
Sludge Drying Beds
Number 18
Area, each, acres 1
Total Area, acres 12
Solids Loading, lbs/ft2/year 11
Solids Loading, lbs/day 15,688
Notes:

AA - annual average; BOD₅ - 5-day biochemical oxygen demand test; ft2 - square feet; ft3 - cubic feet; gpd - gallons per day; gpm - gallons per minute; lbs - pounds; mg/L - milligrams per liter; mgd - million gallons per day; PH - peak hour; PTFs - primary trickling filters; MM - maximum month; SOR - surface overflow rate; STFs - secondary trickling filters; TSS - total suspended solids; VSS - volatile suspended solids TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1B RECOMMENDED SAMPLING PLAN
TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS JUNE 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1B-1
Table 1B.1 Summary of Sampling Plan
Sample Analytical Method(3)
Composite Samples(1) Grab Samples(2)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Influent
Grit
Chamber
Influent
Grit
Chamber
Effluent
Primary
Clarifier
Effluent
Primary
Trickling
Filter Pump
Station
Primary
Trickling Filter
No. 1 Effluent
Primary
Trickling Filter
No. 2 Effluent
Intermediate
Clarifier
Effluent
Secondary
Trickling
Filter Pump
Station
Secondary
Trickling
Filter No. 1
Effluent
Secondary
Trickling
Filter No. 2
Effluent
Effluent Primary
Sludge
Intermediate
Clarifier
Underflow
Secondary
Clarifier
Underflow
Thickener
Underflow
Thickener
Overflow
Digested
Sludge
Drying Bed
Supernatant
Sample Volume Required (liters) 5.5 2.5 2.5 3 5 3.5 3.5 2 5 2.5 2.5 5 1.5 2 2 Field Measurements
Flow ●(7)
Temperature SM 2550 B ●(7) ●(7) ●(7)
pH ●(7) ●(7) ●(7)
Gas Flow ●(7)
Unfiltered
COD SM 5220 B, C, or D ● ● ● ● ● ● ● ● ● ● ● ● ● ●
BOD SM 5210 B ● ● ● ●
CBOD SM 5210 B ●(7) ● ● ● ● ● ● ● ● ● ● ●(7) ● ●
TSS SM 2540 D ●(7) ● ● ● ● ● ● ● ● ● ● ●(7) ● ● ● ●(7) ● ●(7) ● VSS SM 2540 D,E ● ● ● ● ● ● ● ● ● ● ● ●(7) ●(7)
TKN EPA 351.1 ●
TP EPA 200.7/200.8 ● ●
Alkalinity SM 2320 B ● ● ● ● ●(7)
Filtered(4)
sCOD SM 5220 B, C, or D ● ● ● ● ● ● ● ● ●
sBOD SM 5210 B ● ● ● ●
sCBOD SM 5210 B ● ● ● ● ● ●
sTKN EPA 351.1 ● ●
Ortho-P SM 4500 PE ●
Filtered(5)
NH3-N SM 4500-NH3 H ● ● ● ●
NO3-N SM 4500/EPA 300.0 ● ● ●
NO2-N SM 4500/EPA 300.0 ● ● ●
TN SM 4500 N, E ● ● ●
Flocculated/Filtered(6)
ffCOD SM 5220 B, C, or D ●
Notes:

BOD - biochemical oxygen demand; EPA - Environmental Protection Agency; ffCOD - flocculated/filtered chemical oxygen demand; sBOD - soluble biochemical oxygen demand; sCBOD - soluble carbonaceous biochemical oxygen demand; sCOD - soluble chemical oxygen demand; SM - Standard Method; sTKN - soluble total Kjeldahl nitrogen
(1) Composite sampling will be flow-paced where possible. (2) Daily sample recommended.
(3) Listed references are Standard Methods for the Examination of Water and Wastewater, 21st edition (https://www.standardmethods.org/). (4) Filtered through 1.2-to-1.5-micron glass fiber filter (the same as those typically used to measure plant TSS/VSS). Filtration should occur immediately after collection before samples are shipped. (5) Filtered through 0.45-micron Millipore filter. Filtration should occur immediately after collection before samples are shipped. Prior to filtration, filters should be triple rinsed with deionized water. (6) Sample preparation per Mamais et al., 1993 (https://www.sciencedirect.com/science/article/abs/pii/004313549390211Y). (7) Red dots designate data that is currently collected by the City.

TM 1 - EXISTING WWTP PROCESS, HISTORICAL PERFORMANCE, AND CONCEPTS FOR NEAR-TERM EFFLUENT QUALITY IMPROVEMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX 1C SK VALUE CALCULATIONS
SK Value Calculations
Parameter PTF #1 PTF #2 STF #1 STF #2
Q + Qr, mgd 11.4 7.8 11.5 11.5
Diameter, ft 60 60 180 180
Media Depth, ft 12 12 3.33 3.33
Specific Area , ft2 27 42 42 42
# of arms 2 2 2 2
Area, ft2 2,826 2,826 25,434 25,434
Volume, ft3 33,912 33,912 84,695 84,695
Media Area, ft2 915,624 1,424,304 3,557,199 3,557,199
Hydraulic Loading, gpm/ft2 2.80 1.92 0.31 0.31
Hydraulic Loading, m3/m2/hr 7.00 4.79 0.79 0.79
Current Organic Loading, lb BOD/kcf/d 222 150 40 40
July 2023 Site Visit
Distributor Rotational Speed, rpm 1.33 0.40 0.40 0.40
Distributor Rotation Time, secs 45 150 150 150
Distributor Rotation Time, minutes 0.75 2.50 2.50 2.50
SK, mm/pass 42.8 97.6 16.0 16.0
February 2024 Meeting
Distributor Rotational Speed, rpm 0.15 0.26
Distributor Rotation Time, secs 390 230
Distributor Rotation Time, minutes 6.50 3.83
SK, mm/pass 41.6 24.5
Recommendations for Normal Operation
Recommended SK (mm/pass) for Operation in MOP-35 200 - 600 150 - 450 50 - 150 50 - 150 Recommended SK (mm/pass) target 200 150 50 50
Distributor Rotational Speed, rpm 0.29 0.26 0.13 0.13
Distributor Rotation Time, secs 211 231 469 469
Distributor Rotation Time, minutes 3.51 3.85 7.81 7.81
Recommendations for Daily Flushing (1 hr)
Recommended SK (mm/pass) for Operation in MOP-35 600 450 150 150 Recommended SK (mm/pass) target 600 450 150 150
Distributor Rotational Speed, rpm 0.10 0.09 0.04 0.04
Distributor Rotation Time, secs 630 691 1,408 1,408
Distributor Rotation Time, minutes 10.50 11.52 23.47 23.47 SK Value Calcs.xlsxSummary 8/9/2024
VOLUME 3 / CHAPTER 1: WASTEWATER CHARACTERIZATION AND PROCESS MODELING OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX B SUPPLEMENTAL SAMPLING PLAN
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/WWTPSupplementalSamplingPlan/ProjMemo-SuppSamplingPlan FINAL / 1

PROJECT MEMORANDUM

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Project No.: 202301-00
Date: October 21, 2026
Prepared By: Graham Juby, PhD, PE
Reviewed By: Toby Pizot/Komal Rathore
Subject: Supplemental Sampling Effort

1.0 INTRODUCTION AND BACKGROUND
This project memorandum outlines the recommended sampling plan for certain specific constituents at the City of Santa Maria (City) Wastewater Treatment Plant (WWTP). This wastewater Supplemental Sampling Effort is focused on two specific purposes. The first is to collect preliminary/baseline data for constituents not required under the current discharge permit but which may be regulated in the future.

The second is to gather additional information on the impact of septage discharges on the influent nitrogen concentrations. The data will be incorporated into Volumes 2 and 3 of the Master Plan.

The supplemental sampling plan is recommended for three weeks, with samples collected once per week. It is intended that all the samples will be collected by the WWTP staff on the same day, and during similar approximate times over the three week period. For example, the samples may all be collected on Wednesdays near 10 a.m. over three weeks.

2.0 SAMPLING PLAN
It is recommended that samples be taken during a one-to-two-hour time period on the same day of the week. This sampling event shall recur at this same period and day for three weeks. Samples will be collected at three locations: Junction Box A, the influent to Junction Box B, and the secondary effluent box.

A comparison of the concentrations between Junction Box A and B will provide information about the impact of septage on the wastewater quality.

Table 1 summarizes the volumes that will be collected from each sample location.

Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.21 18:20:57-07'00'

PROJECT MEMORANDUM
FINAL / 2
Table 1 Sampling Plan Locations
Location Grab Sample Volume (Liter) Constituents to be Sampled Junction Box A 2 TKN, NH3
Junction Box B 2 TKN, NH3
Secondary Effluent Box 8 See Table 2
Notes:

NH3 - ammonia; TKN - total Kjeldahl nitrogen
Each sample will be transferred into the sample bottles furnished by the external laboratory, FGL, Inc. (FGL). It is anticipated that City staff will collect all samples and transfer the grab samples into the sample bottles. It is also anticipated that the City staff will prepare the sample bottle labels and prepare the Chain of Custody form from the laboratory.

Note that actual sample volumes may differ depending on the number of bottles requested by the laboratory for the specific analysis to be performed. Bottles will be provided by the contract laboratory, and pickup of the samples will be coordinated by the City.

Table 2 summarizes the constituents that will be analyzed from samples collected at the Secondary Effluent Box.

Table 2 Constituents for Analysis in the Secondary Effluent Constituent Sampling Method(1)
Metals
Aluminum EPA 200.7/200.8
Arsenic EPA 200.7/200.8
Cadmium EPA 200.7/200.8
Chromium EPA 200.7/200.8
Manganese EPA 200.7/200.8
Selenium EPA 200.7/200.8
Zinc EPA 200.7/200.8
Haloacetic Acids
Monochloroacetic Acid EPA 552.2
Dichloroacetic Acid EPA 552.2
Trichloroacetic Acid EPA 552.2
Monobromoacetic Acid EPA 552.2
Dibromoacetic Acid EPA 552.2
Total Trihalomethanes
Bromoform EPA 624.1
Chloroform EPA 624.1
Dichlorobromomethane EPA 624.1
Dibromochloromethane EPA 624.1

PROJECT MEMORANDUM
FINAL / 3
Constituent Sampling Method(1)
PFAS
Perfluorooctanoic Acid EPA 537.1
Perfluorooctane Sulfonate EPA 537.1
Perfluorobutanesulfonic Acid EPA 537.1
Perfluorohexane Sulfonate EPA 537.1
Perfluorononanoic Acid EPA 537.1
Miscellaneous
Sytrene EPA 524.2
MTBE EPA 524.2
Phenols EPA 420.1
Mercury EPA 245.1
Perchlorate EPA 331.0
Chlorate/Chlorite/Bromate EPA 300.1

1.4 Dioxane EPA 8270
N-Nitrosodimethylamine Not Applicable
Formaldehyde – Water EPA 8315A
Notes:

EPA - United States Environmental Protection Agency; PFAS - per- and polyfluoroalkyl substances (1) FGL will prepare sample bottles with the appropriate volume needed for each specific analysis. The 8 liters of sample indicated in Table 1 will be distributed among various sample bottles provided by FGL.

The sampling methods are standard for each constituent and mandated by state and federal law. Note that there are specific sampling instructions for collecting samples for PFAS analysis. See Attachment A for information provided by FGL.

FGL will provide all the specific sample bottles and labels required for all of the constituents, including the volatile organic compounds (VOCs), so that the City can do all of the sample segregation.

3.0 SAMPLING COSTS
An estimate of the external laboratory sampling cost was based on a recent quote received from FGL, located in San Luis Obispo. The weekly cost is estimated to be $2,781, resulting in a total analytical cost of $8,950 for the three sampling events. Samples will be collected from the WWTP, and the cost of pickup is included in the total price.

A pricing summary from FGL is included in Attachment B.

3.1 Benefits of the Sampling Exercise
The primary goal of this sampling plan is to develop a baseline for constituents that may be regulated in the future. The state and local Regional Water Quality Control Boards have indicated that most of the constituents listed in Table 2 may be of regulatory concern in the future. As such, a record of the current levels of each constituent will be useful during future discussions about regulatory standards and the type of treatment that may be needed to remove them. Further, the baseline will help with the selection of

PROJECT MEMORANDUM
FINAL / 4
process alternatives for the Phase 1 expansion and provide an understanding of the flexibility which may need to be included in the treatment plant layouts to accommodate additional processes in the future.

The supplemental goal of this exercise is to ascertain the extent to which nitrogen and ammonia is being added to the facility’s influent streams by the septage station. The December 2023 sampling exercise indicated that the influent wastewater has a relatively high concentrations of both TKN and ammonia; higher than is typical of domestic wastewater. The source of the higher nitrogen is not known, but does impact the treatment process sizing and selection. If the septage is identified as the source then this would explain the higher values and may also lead to considering different ways to address this nitrogen load, and/or policies regarding septage receiving.

4.0 NEXT STEPS
Assuming that the City is in agreement with the proposed approach, the next step will be to schedule FGL for the first round of sampling so that they can prepare the bottles and the labels.

FGL will need about 5 business days to get the prolog set up and the sample kits put together.

As mentioned above, FGL will send all of the specific bottles and labels required for all of the constituents, including the VOCs, to the WWTP laboratory so that the City can collect the samples as needed for the specific analyses.

Again, please note the special sampling protocol for PFAS (Attachment A). This should be followed closely to avoid any external contamination of the sample.

PROJECT MEMORANDUM
FINAL

ATTACHMENT A SAMPLING INSTRUCTIONS FOR

PERFLUOROALKYL SUBSTANCES (PFAS)
Sampling Instructions for Perfluoroalkyl Substances (PFAS) SI-1 Rev#4.0 SFRY 09/2020
Methods and Matrices:

Drinking Water:
• EPA 537.1
• EPA 537.1-DoD ELAP-ISO 17025 (DoD-Department of
Defense)
Non-Potable Water & Solid/Soil:
• PFAS by LCMSMS- ESB SOP T-758
• PFAS By LCMSMS (QSM 5.3 Table B-15 Compliant)
Sample Containers and Volume Requirements Guidelines:

Sample
Matrix
Method Sample
Container++
Preservative Field Blank
Container/Preservative
(if required)
Drinking
Water
EPA 537.1
or
EPA 537.1-
DoD
One 250mL
Polypropylene bottle 1.25g Trizma
Preserved Reagent Water Bottle-250mL Polypropylene bottle w/reagent water and 1.25g Trizma
and
Field Blank bottle -250mL
Polypropylene bottle, empty
Non-Potable
Water √√
PFAS by

LCMSMS-ESB SOP
T-758
or
PFAS By
LCMSMS
(QSM 5.3
Table B-15
Compliant)
One 250mL
Polypropylene
bottle
and
One 50mL
Polypropylene
conical tube**
(Required for
sample dilution, if
needed, and
difficult matrices.)
None-Unpreserved
(Effluents do
not require
preservation
for
dechlorination)
Reagent Water Bottle- 250mL
Polypropylene bottle
w/reagent water
and
Field Blank bottle -250mL
Polypropylene bottle, empty
Note: FB are recommended
but not required except for
DOD method
Solid/Soil ◊
PFAS by

LCMSMS-ESB SOP
T-758
or
PFAS By
LCMSMS
(QSM 5.3
Table B-15
Compliant)
50mL Polypropylene
conical tube**
or
8 oz. jars w/
Polypropylene/HDPE
lids
None-Unpreserved
Container N/A
Please note: Laboratories submitting samples on behalf on their client will be responsible for providing client with appropriate sample containers and preservatives.
++ Required Quality Control: Collect two additional containers for at least one site per sample set in order to provide the laboratory with the required volume to perform Matrix Spike/Matrix Spike Duplicate batch QC.
**50mL conical tubes must be filled to the line noting 3 triangles- Headspace OK (Part# for 50mL tubes B0193234 used by Babcock)** Handling Instructions:
 The sample handler must wash their hands with Alconox® or Liqui-Nox® soap, rinsing with deionized water before sampling and wear nitrile gloves while filling and sealing the sample bottles. A fresh pair of gloves must be used with each sampling site. Never eat, drink or smoke during sampling activity. Fill gasoline in the vehicle the day before sampling and avoid sampling during rain if possible.
 PFAA contamination during sampling can occur from a number of common sources, such as: fast food packaging, aluminum foil, zip-loc® plastic bags, glass, Teflon®, cosmetics, moisturizers, sun block, fragrances, fabric softeners, Post-it® notes, Scotch® tape, waterproof markers or notebooks and new clothing or water resistant clothing such as Gore-tex®. It is recommended that these items be avoided at least 24 hours prior to sampling. It is a good idea to fill out bottle labels and chain of custodies ahead of time.

Sample Collection:
 Collect sample directly from a tap on the well discharge line, at a location prior to any treatment. Flush to waste at full flow for a minimum of 15 minutes before sample collection. Avoid taps with Teflon® tape.
 Fill sample bottles nearly full, taking care not to flush out the preservative. Do not touch the inside of the bottle or lid during sampling. Invert the bottle several times to mix the sample with the preservative. Keep the sample sealed from time of collection until delivery to laboratory.
 For solid or soil samples follow handling instructions above. Carefully fill conical tube with sample. Sub-samples collected should be representative of the original sample in which the sub-sample was taken.

Field Reagent Blank Instructions:

The following MUST occur at the sampling site and at the time of sampling:
1) Pour the contents of the “Preserved Reagent Water” bottle into the empty “Field Blank” bottle.
2) Keep the Field Blank bottles sealed and on ice along with the sample bottles until they are delivered to the laboratory.
3) Please return the empty Reagent Water bottle along with the samples. 4) Samples must be extracted within 14 days of the sampling date.

Storage and Transportation Instructions:

Pack samples in clean cooler inside ultra-clean polypropylene or HDPE material bags supplied by the laboratory. Tie the top of the bag to close. Surround samples with wet ice. Do not use blue ice or ice packs. Deliver to the laboratory as soon as possible.

Samples must arrive at the laboratory within 48 hours of sampling, at ≤ 10°C (50°F) but not frozen.

If samples are received more than 48 hours after sampling, they must be ≤ 6ーC (42.8°F) but not frozen. Samples received on the day of sampling need only be submitted on ice to meet the temperature requirement.
√√ For treatment facilities where equipment utilized is composed of or comes in contact with any Perfluoroalkyl Substances an Equipment Blank (Rinsate) is recommended: A sample of analyte free water poured over or through field sampling equipment prior to the collection of samples.

Upon request, a one gallon container of DI water will be provided by the laboratory in your bottle order for Equipment Blank sampling.
◊ Solid/Soil matrix please submit at least 20 grams of sample.

PROJECT MEMORANDUM
FINAL

ATTACHMENT B FGL PRICING SUMMARY

Page 1 of 2 ends

Date: June 3, 2024
To: Carollo Engineers - 8002014
Attn: Tobias Pizot E_Mail [email protected]
Subject: Price Quote No: CC 20240531-01 . . . Santa Maria Project Good day Toby ~ FGL appreciates the opportunity to provide a revised version of this quote; now including PFAS Analysis. Please contact the lab in San Luis Obispo at (805) 783-2940 to schedule your sampling events or obtain supplies. Please review footnotes for additional information. We look forward to being of service.

Quote For Time Period: May 31, 2024 through December 31, 2024 Sampled By: Client Sampling
Constituent Analytical Method Price per Sample
Analysis Fee
Prep for Total Metals Analysis EPA 200 29.00
Individual Metals - Al;As;Cd;Cr;Mn;Se;Zn EPA 200.7/EPA 200.8 32.00 Mercury (Hg) EPA 245.1 46.00
Perchlorate EPA 331.0 95.00
Total Nitrogen (TKN + NO3-N + NO2-N) Calculation 142.00 Nitrate (NO3 or NO3-N) EPA 300.0/SM4500 34.00
Nitrite (NO2 or NO2-N) EPA 300.0/SM4500 34.00
Total Kjeldahl Nitrogen (TKN) EPA 351.1 74.00
Ammonia (NH3-N) SM4500-NH3 H 43.00
Haloacetic Acids EPA 552.2 185.00
VOC - Two Compound (MTBE, Styrene) EPA 524.2 200.00
VOCs Full List (Including TTHMs) EPA 624.1 276.00
Phenols EPA 420.1 80.00
Subcontracted: EPA 300.1 - Chlorate EPA 300.1 96.00
Subcontracted: EPA 300.1 - Chlorite EPA 300.1 96.00
Subcontracted: 1,4, Dioxane by 8270M EPA 8270 250.00
Subcontracted: NDMA 290.00
Subcontracted: Formaldehyde - Water EPA 8315A 239.00
Subcontracted: EPA 537.1 PFAS (Primary Sample) EPA 537.1 295.00 *Subcontracted: EPA 537.1 PFAS (Field Blank) EPA 537.1 245.00 Group Price: 2781.00
Corporate Offices & Laboratory
853 Corporation Street
Santa Paula, CA 93060
TEL: (805)392-2000
Env FAX: (805)525-4172 / Ag FAX: (805)392-2063
CA ELAP Certification No. 1573
Office & Laboratory
2500 Stagecoach Road
Stockton, CA 95215
TEL: (209)942-0182
FAX: (209)942-0423
CA ELAP Certification No. 1563
Office & Laboratory
563 E. Lindo Avenue
Chico, CA 95926
TEL: (530)343-5818
FAX: (530)343-3807
CA ELAP Certification No. 2670
Office & Laboratory
9415 W. Goshen Avenue
Visalia, CA 93291
TEL: (559)734-9473
FAX: (559)734-8435
CA ELAP Certification No. 2810
Office & Laboratory
3442 Empresa Drive, Suite D
San Luis Obispo, CA 93401
TEL: (805)783-2940
FAX: (805)783-2912
CA ELAP Certification No. 2775

ENVIRONMENTAL AGRICULTURAL
Analytical Chemists

Page 2 of 2 ends

Constituent Analytical Method Price per Sample
Disposal Fee
Materials/Disposal Fee ENV (Charged per COC) 5.00
Group Price: 5.00
Constituent Analytical Method Price per Sample
Service Fee
**Ship/Drop-Off Bottles/Containers 50.00
**Pick up Fee 50.00
Group Price: 100.00
* The Field Blank for PFAS is required for regulatory compliance samples. There is a charge for the lab to extract and hold it. It will be reported only if there is a "hit" in the Primary Sample. ** Delivery of Bottles/Containers and Sample Pick up Fees are optional. Carollo may opt to pick up all sampling supplies and/or drop off samples at our SLO lab location for no charge. ● Expected TAT for analytical reports is 18-21 business days. ● A Quality Assurance/Quality Control report is supplied with all of our analyses. This assures our valued clients of accurate and defensible data.
● All work undertaken is subject to our terms and conditions, which are available upon request. ● Note: A $5.00 Materials/Disposal Fee is charged for each Chain of Custody submitted to the lab. ● Note: FGL provides our customers with sampling supplies at no charge, when picked up at the lab. A fee applies to have them delivered.
● Note: FGL may subcontract certain analyses whenever conditions impact the ability to provide results in a timely manner.

If you have any questions regarding this quote or require any modifications, please call (805) 392-2000 and ask to speak with a marketing associate. Thank you.

Reviewed and
Approved By
Glenn Olsen
Marketing Director
Prepared By: Glenn A. Olsen
Date: 2024-06-03 16:55

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 4: Existing Facilities Condition
Assessment
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 4: Existing Facilities Condition
Assessment
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:13:05-07'00'
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 4/Ch01.docx Contents
CHAPTER 1 CONDITION ASSESSMENT

1.1 Executive Summary 1-1

1.1.1 Summary of Findings 1-1

1.1.2 Near-Term Capital Improvement Program (CIP) 1-7

1.2 Methodology and Criteria 1-7

1.2.1 Purpose 1-7

1.2.2 Santa Maria Wastewater Treatment Plant Overview 1-9

1.2.3 Approach 1-9

1.2.4 Process Areas Assessed 1-10

1.2.5 Asset Condition Scoring 1-14

1.2.6 Scoring Criteria 1-15

1.2.7 Assessment Method 1-17

1.3 Condition Assessment Findings 1-18

1.3.1 Septage Receiving 1-18

1.3.2 Headworks (including Grit Chamber and Junction Box) 1-21

1.3.3 Primary Clarifiers, Primary Sludge Building, and Intermediate Clarifier 1-26

1.3.4 Primary Tricking Filters and Primary Trickling Filter Pump Station 1-32

1.3.5 Secondary Trickling Filters and Secondary Trickling Filter Pump Station 1-38

1.3.6 Secondary Clarifiers 1-42

1.3.7 Digesters and Thickeners 1-45

1.3.8 Operations/Administration/Plant Facilities 1-51

1.3.9 Piping and Underground Facilities 1-56

1.4 Summary and Recommendations 1-58
Appendices

APPENDIX A NEAR-TERM PROJECT CIP ESTIMATES
Tables
Table 1.1 Summary of Near-Term Projects Identified in the Condition Assessment 1-3 Table 1.2 Summary of Findings Indicating Potential Facilities for Consideration in the Phase 1 and/or Phase 2 Expansions 1-5
Table 1.3 Short-Term CIP 1-8
Table 1.4 Scoring Categories per Asset Type 1-14
Table 1.5 General Condition Scoring Descriptions 1-15
Table 1.6 Structural Specific Scoring Descriptions (Foundation and Coating) 1-16 Table 1.7 Mechanical Specific Scoring Descriptions (Corrosion and Exterior) 1-17 Table 1.8 Electrical and Instrumentation Specific Scoring Descriptions (Wiring/Cable Condition and Equipment) 1-17
Table 1.9 Septage Structural Asset Scoring Summary 1-19 VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 1.10 Septage Mechanical Asset Scoring Summary 1-20 Table 1.11 Septage Station Near-Term Projects Summary 1-20 Table 1.12 Headworks Electrical Asset Scoring Summary 1-21 Table 1.13 Headworks Structural Asset Scoring Summary 1-23 Table 1.14 Headworks Mechanical Asset Scoring Summary 1-24 Table 1.15 Headworks Area Near-Term Projects Summary 1-26 Table 1.16 Primary Clarifier Electrical Asset Scoring Summary 1-28 Table 1.17 Primary Clarifier Structural Asset Scoring Summary 1-28 Table 1.18 Primary Clarifier Mechanical Asset Scoring Summary 1-30 Table 1.19 Primary Clarifier Area Near-Term Projects Summary 1-32 Table 1.20 PTF Electrical Asset Scoring Summary 1-34
Table 1.21 PTF Structural Asset Scoring Summary 1-34
Table 1.22 PTF Mechanical Asset Scoring Summary 1-36
Table 1.23 PTF Area Near-Term Projects Summary 1-37
Table 1.24 STF Electrical Asset Scoring Summary 1-38
Table 1.25 STF Structural Asset Scoring Summary 1-38
Table 1.26 STF Mechanical Asset Scoring Summary 1-40
Table 1.27 STF Area Near-Term Projects Summary 1-41
Table 1.28 Secondary Clarifier Structural Asset Scoring Summary 1-42 Table 1.29 Secondary Clarifier Mechanical Asset Scoring Summary 1-44 Table 1.30 Secondary Clarifier Area Near-Term Projects Summary 1-45 Table 1.31 Solids Handling Electrical Asset Scoring Summary 1-47 Table 1.32 Solids Handling Structural Asset Scoring Summary 1-47 Table 1.33 Solids Handling Mechanical Asset Scoring Summary 1-49 Table 1.34 Solids Handling Area Near-Term Projects Summary 1-50 Table 1.35 Administration/Site Facilities Electrical Asset Scoring Summary 1-51 Table 1.36 Administration/Site Facilities Structural Asset Scoring Summary 1-53 Table 1.37 Administration/Site Facilities Mechanical Asset Scoring Summary 1-54 Table 1.38 Administration and Plant Facilities Area Near-Term Projects Summary 1-56 Table 1.39 Summary of Findings Indicating Potential Structural Facilities for Consideration in the Phase 1 and/or Phase 2 Expansions 1-60 Figures
Figure 1.1 Facilities for Consideration in Phase 1 and 2 Expansion 1-2 Figure 1.2 Santa Maria WWTP Process Flow Diagram 1-9
Figure 1.3 Condition Assessment Workflow 1-10
Figure 1.4 Assessed Process Areas 1-12
Figure 1.5 Primary Electrical Panels and Control Centers 1-13 Figure 1.6 Septage Receiving Process Area 1-18
Figure 1.7 Septage Station North Column 1-19
Figure 1.8 Headworks and Grit Chamber Process Area Locations 1-22 Figure 1.9 Headworks Structure South Slab 1-23
Figure 1.10 Inlet Isolation Gates at Headworks 1-25
Figure 1.11 Primary Treatment Process Area Locations 1-27 VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Figure 1.12 Cracks in the Intermediate Clarifier 1-29
Figure 1.13 Blowers for the Aerated Grit System Located in the Primary Sludge Building 1-31 Figure 1.14 PTF Process Area 1-33
Figure 1.15 PTF #1 Structure Showing Concrete Corrosion and Exposed Aggregate 1-35 Figure 1.16 PTF #1 Rotary Distributor to be Replaced 1-36 Figure 1.17 STFs Process Area 1-39
Figure 1.18 Secondary Clarifier Processed Area 1-43
Figure 1.19 Secondary Clarifier #1 Concrete 1-44
Figure 1.20 Solids Handling Process Area 1-46
Figure 1.21 Digester #3 Roof 1-48
Figure 1.22 Administration/Plant Facilities Process Area 1-52 Figure 1.23 Maintenance Shop Roof Ponding 1-54
Figure 1.24 Existing Facilities for Potential Use in Phase 1 and Phase 2 1-59 VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Abbreviations
AM asset management
Carollo Carollo Engineers
CCTV closed-circuit television
CIP Capital Improvement Program
City City of Santa Maria
EI&C electrical, instrumentation, and controls
MCC motor control center
N/A not applicable
PTF primary trickling filter
PTFPS primary trickling filter pump station
RCP reinforced concrete pipe
RUL remaining useful life
STF secondary trickling filter
STFPS secondary trickling filter pump station
VFD variable frequency drive
WWTP wastewater treatment plant
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 CONDITION ASSESSMENT

1.1 Executive Summary
The City of Santa Maria (City) is developing a Wastewater Master Plan to identify needed expansions/modifications to the existing treatment facilities to meet current and future regulations and growth in the City to the year 2060. This chapter summarizes the process and results of the visual condition assessment of the City's wastewater treatment plant (WWTP). The visual condition assessment will be used to prioritize future investments in the facilities to maintain their condition and performance until the first phase of the new facilities is built (roughly by 2033), assess facilities that require immediate upgrade, and determine what assets may potentially be reused as part of the overall master planned site.

1.1.1 Summary of Findings
The results of the condition assessment indicate that there are facilities within the existing plant that will require maintenance and/or replacement in the short term; that is before the new Phase 1 treatment facilities have been constructed. A list of these projects is included in Table 1.1. Individual repair projects are summarized at the end of each section. Also, the results show that there are a limited number of structures and facilities within the general process areas that should be considered for inclusion in the future plant expansions. Structural scores were the foundation for this summary due to the longer lifespan of concrete. There is an expectation that mechanical equipment will likely be replaced on a continual periodic basis as its condition demands.

Phase 1 of the plant expansion should be completed around 2033, and Phase 2 is expected to be completed around 2052. Using the "remaining useful life" (RUL) criteria as the base metric, Figure 1.1 was developed to illustrate which process areas should be considered for inclusion in the Phase 1 and Phase 2 expansion timelines. Typically, facilities that should be considered in Phase 1 are those with a score of 2 as RUL, that is a RUL of 10 to 20 years, and the facilities that should be considered in Phase 1 and Phase 2 are those with a score of 1, that is a RUL of greater than 20 years. There are some structures, such as the intermediate clarifier, not highlighted in Figure 1.1 that may ultimately be included as part of the expansion, depending on the outcome of the treatment system selected.

Table 1.1 presents a list of the near-term projects recommended for completion to extend and maintain plant facilities. They are listed in order of priority in the table.

Table 1.2 presents a summary of all the major facilities that could be considered for use during the Phase 1 or Phase 2 expansion of the treatment plant. The table lists the year of construction, the current age, the anticipated typical structural lifetime, the estimated RUL, and then whether the facility/structure should be considered as part of the Phase 1 and/or Phase 2 expansion. Some of these facilities are included in the near-term projects list. Their continued use in Phase 1 and Phase 2 assumes that the near-term repairs needed are made. Structures that are not listed here are not considered for Phase 1 or Phase 2 expansion. However, some of the structures now listed for Phase 1 or 2 expansion not highlighted are still under consideration as ancillary facilities.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
Figure 1.1 Facilities for Consideration in Phase 1 and 2 Expansion VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Table 1.1 Summary of Near-Term Projects Identified in the Condition Assessment Asset Relative Importance Suggested Repair Timeline
Septage Recirculation Area
Septage Station Overhang 1 5-10 years
Headworks Area
Bypass Headworks Structure 1 1-2 years
Headworks Structure 2 3-5 years
Grit Chamber Structure 3 5-10 years
Sump Pump #1 4 5-10 years
Proportional 36-inch Butterfly Valve 5 5-10 years
Proportional Valve Actuator 6 5-10 years
Primary and Intermediate Clarifier Area
Intermediate Clarifier Structure 1 10-20 years
Intermediate Clarifier Drive 2 3-5 years
Primary Sludge Building Blowers 3 3-5 years
Primary Sludge Pump #1 4 5-10 years
PTFPS Inlet Gates 5 5-10 years
Primary Sludge Building Structure 6 5-10 years
Intermediate Sludge Pump 7 5-10 years
Primary Trickling Filter Area
PTF #1 Rotary Distributor 1 1-2 years
PTF #1 Structure 2 3-5 years
PTF Pump Station Structure 3 3-5 years
PTF Pump Station Gate Operators 4 3-5 years
Secondary Trickling Filter Area
STF Structures #1 and #2 1 5-10 years
STF Pump Station Structure 2 10-15 years
STF Pump Pipe Supports 3 3-5 years
Secondary Sludge Pumps 4 5-10 years
Secondary Clarifier Area
Secondary Clarifier #1 and #2 Structure 1 10-20 years
Secondary Clarifier Pumps and Drives 2 10-15 years
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Asset Relative Importance Suggested Repair Timeline
Solids Handling Area
Digester #2 Structure 1 1-3 years
Digester #3 Structure 2 5-10 years
Digester #1 Structure 3 5-10 years
Sludge Thickener #1 Structure and Catwalk 4 5-10 years
Sludge Thickener #2 Structure and Catwalk 5 5-10 years
Digester Control Building 6 10-15 years
Administration/Plant Facilities Area
Storage Building Structure 1 3-5 years
Maintenance Shop Structure 2 3-5 years
Boiler Area Building Overhang 3 3-5 years
Facility Drainage Sump Pumps 4 3-5 years
Standby Water Well 5 5-10 years
Notes:

PTF - primary trickling filter; STF - secondary trickling filter VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Table 1.2 Summary of Findings Indicating Potential Facilities for Consideration in the Phase 1 and/or Phase 2 Expansions Process Area Structure Year of
Construction
Current Age
(years)
Typical Structural
Lifetime (years)
Estimated Structure
Remaining Lifetime
(years)
2033
(Phase 1
Expansion)
2052
(Phase 2
Expansion)
Septage Recirculation Area
Septage Receiving Station 2020 5 ~ 75 40-50 Yes Yes
Headworks Area
Junction Box B 1979/1996/
2019 (rehabbed)
38 50-70 20-40 Yes No
Headworks 1996 28 50-70 20-40 Yes No
Grit Chamber 1979 45 50-70 5-25 Yes No
Primary Clarifier Area
Primary Clarifier #1 1982 42 ~ 80 ~ 40 Yes Yes
Primary Clarifier #2 2009 15 ~ 80 ~ 65 Yes Yes
Primary Sludge Building 1982 42 ~ 75 ~ 30 Yes Yes
Primary Trickling Filter Area
PTF #2 2009 16 ~ 75 ~ 50 Yes Yes
Secondary Trickling Filter Area
STFPS 1980 44 ~ 75 ~ 10 Yes No
Secondary Clarifier Area
Secondary Clarifier #1 1964 61 ~ 80 ~20 Yes No
Secondary Clarifier #2 1964 61 ~ 80 ~20 Yes No
Percolation Pond Pump Station 2009 16 ~ 80 ~ 65 Yes Yes VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Process Area Structure Year of
Construction
Current Age
(years)
Typical Structural
Lifetime (years)
Estimated Structure
Remaining Lifetime
(years)
2033
(Phase 1
Expansion)
2052
(Phase 2
Expansion)
Solids Handling Area
Digester #4 2009 16 ~ 75 ~ 60 Yes Yes
Sludge Thickener #2 1998 26 ~ 75 ~ 50 Yes No
Digester Control Building #2 2009 16 ~ 80 ~ 65 Yes Yes
Administration and Plant Facilities Area
Operations Building 1982 42 ~ 80 ~ 40 Yes Yes
Maintenance Shop (Warehouse) 1982 42 ~ 80 ~ 40 Yes No
Storage Building 1996 28 ~ 80 ~ 50 Yes No
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7

1.1.2 Near-Term Capital Improvement Program (CIP)
Table 1.3 provides a compiled set of projects to be undertaken in the near-term prior to Phase 1 upgrades. Appendix A lists details and projects costs of each individual upgrade for utilization in the CIP.

The costs presented are preliminary and should be refined during the preliminary design phase. Certain projects identified from the condition assessment process were either consolidated with other projects or removed during discussions with the City as the CIP table was finalized.

1.2 Methodology and Criteria

1.2.1 Purpose
The visual condition assessments were completed over a two-day period from March 20, 2024, to March 21, 2024, by a multi-disciplinary team of engineers, including mechanical, structural, and electrical experts. The Carollo Engineers (Carollo) team was accompanied by engineering, maintenance, and operations staff from the City who provided additional input and institutional knowledge. The findings will aid in identifying capital improvement projects and master planning.

Assets and facilities were evaluated using a typical industry approach, adapted from the International Infrastructure Management Manual, with each asset being assigned a 1 through 5 score. In general, a score of 1 indicates that an asset is in excellent or like-new condition, while a score of 5 indicates that an asset is not serviceable and requires replacement or significant rehabilitation. The purpose of the score is to provide a common scale to rate all assets per discipline so they can be compared relative to one another. The results of the assessment were used as one source of information to develop capital plan recommendations, highlight deficient assets, and tabulate assets that may last for usage in any plant expansion.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Table 1.3 Short-Term CIP
Proposed
CIP Project
Number
Individual Project
Identifiers
Priority
(1 (high) to
3 (low) scale)
Project Name
CIP Cost
Estimate(1,2,3)
($)
Cost to
O&M
Budget
CIP Cost by Fiscal Year and
Phase ($) Notes
FY 2024-2028 FY 2029-2031
100 Area 1 3 Septage Station Rehabilitation $27,000 $- $27,000 Low priority 200 Area 2- 1A, Area 2- 1B,
Area 2- 1C, Area 2-1E
1 Headworks Rehabilitation -
Phase 1
$386,000 $18,000 $368,000
250 Area 2-1D 3 Headworks Rehabilitation -
Phase 2
$112,000 $- $- $112,000 May defer to
Phase 1
Contractor's Scope
300 Area 3- 1A, Area 3-1B,
Area 3-1C, Area 3-1D,
Area 4-1A, Area 4-1B,
Area 4-1C
2 Primary Trickling Filter, Pump
Station, and Primary Clarifier
Rehabilitation
$411,000 $154,000 $- $257,000
400 Area 5-1A, Area 5-1B,
Area 5-1C, Area 5-1D
1 Secondary Trickling Filter
Rehabilitation
$181,000 $- $181,000 $-
500 Area 6-1A, Area 6-1B,
Area 6-1C
2 Secondary Clarifier
Rehabilitation
$144,000 $- $144,000 $-
600 Area 7-1A, Area-7-1D 2 Digester Rehabilitation -
Phase 1
$580,000 $11,000 $569,000 $-
650 Area 7-1B, Area 7-1C 3 Digester Rehabilitation -
Phase 2
$156,000 $- $- $156,000
700 Area 8-1A, Area 8-1D 2 Plant Facilities Projects -
Phase 1
$459,000 $9,000 $450,000 $-
750 Area 8-1B, Area 8-1C 3 Plant Facilities Projects -
Phase 2
$118,000 $- $- $118,000
Notes:
(1) Los Angeles Engineering News-Record Construction Cost Index for February 2024 is 15,214. (2) Estimated Construction Cost includes a 30 percent contingency, 10 percent for general conditions, 15 percent for general contractor, and 4.375 percent for sales tax of the baseline cost.
(3) Total project cost includes a 30 percent markup of the estimated construction cost that accounts for engineering, management, and legal fees.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9

1.2.2 Santa Maria Wastewater Treatment Plant Overview
The City's Utilities Department operates and maintains the WWTP, which consists of headworks, primary clarifiers, PTFs, an intermediate clarifier, STFs, secondary clarifiers, percolation ponds, thickeners, digesters, and sludge drying beds. The WWTP provides preliminary, primary, and secondary treatment and discharges secondary effluent to a system of percolation ponds for disposal, all in compliance with the General Permit Order issued by the Central Coast Regional Water Quality Control Board. The upstream sewer system is almost 100 percent gravity flow to the WWTP. Figure 1.2 illustrates the process flow of the WWTP.

Figure 1.2 Santa Maria WWTP Process Flow Diagram

1.2.3 Approach
The condition assessment of the WWTP was conducted via visual assessment. Prior to the field assessments, Carollo compiled an assessment inventory based on information provided by the City. This inventory included a comprehensive asset list maintained by operators that listed names, process locations, costs, replacements, and ages of equipment.

For this assessment, City staff walked through the entire facility with the Carollo team to highlight deficiencies and provide operational and maintenance requirements on individual assets.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
The condition assessment focused on identifying the RUL of the assets, as well as to plan for future project expansions or modifications related to regulatory changes. Specifically, the goals of the assessment were to:
 Identify and judge assets based on RUL.
 Classify the probability of failure for multiple assets.  Identify poor-condition assets that require immediate action.  Identify assets and equipment that may potentially be considered for use during Phase 1 and Phase 2 plant expansions. Generally, Phase 1 is expected to be in place within 10 years, and Phase 2 would be in place approximately 30 years from now.
 Recommend capital repair and replacement projects for existing assets within the planning period.

Subsequently, Carollo utilized an Asset Management (AM) site titled Carollo AM, that functions as an effective tool to score assets, provide observations, and submit photos from the site. This site was used to help coordinate the results from the assessment and prove a cohesive receptacle for information.

The condition assessment utilized the workflow shown in Figure 1.3 to summarize and develop results.

Figure 1.3 Condition Assessment Workflow
The results are summarized in this document.

1.2.4 Process Areas Assessed
The condition assessment focused on the entirety of the WWTP, divided into the following process areas:

1. Septage receiving.

2. Headworks and grit chamber.

3. Primary clarifiers, primary sludge building, and intermediate clarifier.

4. PTFs and primary trickling filter pump station (PTFPS).

5. STFs and secondary trickling filter pump station (STFPS).

6. Secondary clarifiers.

7. Solids handling (digesters and thickeners).

8. Administration and plant facilities.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
Figure 1.4 highlights the division of these process areas based on their location on the site.

Figure 1.5 highlights the major electrical sources and control panels for the site equipment.

For reference on the electrical equipment, see the following list:
 Main switchboard in the operations building is connected to the grid and the Pacific Gas & Electric connection. The standby generator also connects to the switchboard here in the event of power failure.
 Motor control center (MCC)-BB primarily controls the equipment in process Area 2, with the headworks and grit chamber.
 MCC-B primarily controls the equipment in process Areas 3-6 and is located in the primary sludge building.
 MCC-D primarily controls the digesters, thickeners, and solids handling equipment (process Area 7), and is located in the northern digester control building.  MCC-E was installed with the plant expansion in 2008. It services a few recirculation pumps for the digesters, but will eventually service future mixing pumps and percolation pond pump station equipment.
 MCC-SB services equipment in the Storage Building and other various facility processes.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
Figure 1.4 Assessed Process Areas
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Figure 1.5 Primary Electrical Panels and Control Centers VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14

1.2.5 Asset Condition Scoring
Scoring the assets relies on two important factors: the available information, and the scoring system upon which the subject discipline leads rely to assess equipment or structures.

Assets were split into mechanical, structural, and electrical, instrumentation, and controls (EI&C) by the City, and then noted as such in Carollo AM.

Each asset has a list of questions to be scored. Some are consistent across each discipline, while others are specific to the type of asset. For the purposes of this condition assessment, Table 1.4 indicates the Categories that each asset was scored on.

The installation dates provided by the City indicate the most recent date at which the provided asset was either installed, replaced, or refurbished.

Table 1.4 Scoring Categories per Asset Type
Scoring Category
General/Comprehensive(1)
 General Condition.
 RUL.
 Performance.

Structural
 Foundation.
 Coating.

Mechanical
 Corrosion.
 Exterior.

EI&C
 Wiring/Cable Condition.
 Equipment Components.

Notes:
(1) Description of the scoring of the first three categories is presented in Section 1.2.6.

The first three categories regarding General Condition, RUL, and Performance form the foundation of this assessment.

The subsequent categories are discipline-specific and provide a sense of what specific aspects of the equipment are deficient. However, they serve as a secondary analysis to the primary three categories above. These discipline category analyses will be provided as an appendix to the first three.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15

1.2.6 Scoring Criteria
The scoring criteria for the general, structural, mechanical, and EI&C categories are shown in Table 1.5.

Note that the secondary categories for each discipline serve to provide supplemental information on defective or deteriorated equipment. The primary categories are the main tool by which the system is analyzed.

Table 1.5 General Condition Scoring Descriptions
Condition Score General Description
1 (Best)
New or Excellent Condition:
 Only normal maintenance required.
 Fully functional.
 Has a RUL of >20 years and may be considered for usage in the new WWTP. 2 Minor Defects Only:
 Minor maintenance required (5 percent).
 Fully functional.
 Has a RUL of up to 20 years and may be considered for usage in the new WWTP if cost-effective.
3 Moderate Deterioration:
 Moderate maintenance required (10 percent - 20 percent).  Function not significantly affected.
 Has a RUL of 10-20 years and will likely not be preserved for new construction. 4 Significant Deterioration:
 Significant renewal/upgrade required (20 percent - 40 percent).  Functions as needed but is unreliable.
 Has a RUL of up to 10 years given regular maintenance.  Will not be used for a new plant.
5 (Worst)
Severe Deterioration:
 Over 50 percent of asset requires replacement.
 Barely functional for current conditions.
 Has a RUL of 5 years or less.
 Requires replacement before consideration in a new site.

The current planning process indicates that the Phase 1 Expansion will have an estimated construction completion around 2033. The Phase 2 expansion will follow about 20 years later. Thus, it is important to note that assets with scores of 1 indicate a RUL of greater than 20 years, which puts them in a category to be considered for future use in both Phase 1 and Phase 2 expansions, assuming regular maintenance.

Scores of 2 places assets in a category to be considered for use during the Phase 1 expansion only. Scores of 3 may be considered for Phase 1 Expansion, depending on the application and need. Assets with scores of 4 and 5 have limited remaining life and should not be considered at all for future expansions at the site.

Phase 1 and Phase 2 schedules are discussed in more detail in Volume 2.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
A major aspect of this condition assessment is to identify assets that may be reutilized for plant expansion. For the assessment of future facilities to be preserved, there was a focus on structural assets.

This is due to the longer life spans of structures, and the understanding that mechanical equipment has a significantly shorter lifespan and will typically be replaced four or perhaps five times during the lifespan of the given structure. As such, although the RUL scores still apply to mechanical and electrical equipment, it is more of a relative score compared to the structural facilities.

The discipline-specific scoring systems for structural items are summarized in Table 1.6. Note that the bullet points represent descriptions for foundation and coating.

Table 1.6 Structural Specific Scoring Descriptions (Foundation and Coating) Condition Score General Description
1 (Best)
New or Excellent Condition:
 Foundation in excellent condition, no maintenance required.  No evidence of soil movement.
2 Minor Defects Only:
 Foundation in good condition, some maintenance required.  Some evidence of soil movement with no impact on structure. 3 Moderate Deterioration:
 Foundation in Moderate condition, significant maintenance required.  Measurable soil movement with minor impact on structure. 4 Significant Deterioration:
 Foundation in poor condition, rehabilitation required.  Displacement with impact on structure.
5 (Worst)
Severe Deterioration:
 Foundation in very poor condition, replacement required.  Major movement affecting structural integrity.

The discipline-specific scoring systems for mechanical items are summarized in Table 1.7. Note that the bullet points represent descriptions for corrosion and exterior.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17
Table 1.7 Mechanical Specific Scoring Descriptions (Corrosion and Exterior) Condition Score General Description
1 (Best)
New or Excellent Condition:
 No apparent wear, deterioration, or corrosion.
 Excellent exterior condition.
2 Minor Defects Only:
 Minor coating loss, rust, or corrosion (<10% of surface).  Good exterior condition, minor defects.
3 Moderate Deterioration:
 Some coating loss, apparent corrosion.
 Moderate exterior condition.
4 Significant Deterioration:
 Significant corrosion, damage, or wear not affecting performance.  Poor exterior condition.
5 (Worst)
Severe Deterioration:
 Corrosion, damage, or wear impacting operation.
 Very poor exterior condition.

The discipline-specific scoring systems for EI&C items are summarized in Table 1.8. Note that the bullet points represent descriptions for cable/wiring condition and equipment components.

Table 1.8 Electrical and Instrumentation Specific Scoring Descriptions (Wiring/Cable Condition and Equipment) Condition Score General Description(1)
1 (Best)
New or Excellent Condition:
 Fully operable equipment.
 Excellent wiring and cable condition.
2 Minor Defects Only:
 Operational interface inoperable.
 Wiring and cables have minor defects.
3 Moderate Deterioration:
 Some components inoperable.
 Wiring and cable require consistent maintenance.
4 Significant Deterioration:
 Equipment is running hot or intermittently.
 Wiring and cable require rehabilitation.
5 (Worst)
Severe Deterioration:
 Equipment is inoperable.
 Wiring and cable require replacement.

1.2.7 Assessment Method
In addition to the scoring methods above, the assessment of the assets in each process area was compared using a normalized comparison. The RUL score takes into account each of the previous scoring methods (General Condition, Exterior, Corrosion, Foundation, etc.) and provides a relative score based on the expected life of the asset.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
As such, the shown RUL scores incorporate the standard maximum lives of structural, mechanical, and electrical equipment. Typically, as mentioned, structures last much longer, and the shown scores reflect that difference.

1.3 Condition Assessment Findings

1.3.1 Septage Receiving
The Septage Receiving station is near the entrance to the plant and provides a location for permitted liquid waste hauler to dump septic and septage waste into the influent sewer. It consists of a valve connection, an overhang, and dump pads. Figure 1.6 illustrates the location of the septage relative to other locations on-site.

Figure 1.6 Septage Receiving Process Area
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19

1.3.1.1 Electrical
There were no electrical assets listed in this area. However, the observed instrumentation and controls within the cabinets appeared to be in good condition.

1.3.1.2 Structural
Table 1.9 provides a summary of the septage structural asset scoring.

Table 1.9 Septage Structural Asset Scoring Summary
Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Septage Receiving Station
Shade Overhang
2020 1 1 2 2 1 (>20 years)
Septage Receiving Dump Pads 2020 2 N/A 2 N/A N/A
Notes:

N/A - not applicable
Key observations/recommendations for structural equipment include:
 Septage Recirculation Station had moderate corrosion along the base of its north steel column that supports the overhang. It is recommended that coating and placing a protective curb around the base will preserve the condition.
 Septage Dump Pads were in use during assessment. There were no structural issues identified.

Figure 1.7 shows the Septage Station North Column.

Figure 1.7 Septage Station North Column
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20

1.3.1.3 Mechanical
Table 1.10 provides a summary of the Septage Mechanical Asset Scoring.

Table 1.10 Septage Mechanical Asset Scoring Summary
Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Septage Samplers 2020 1 1 2 2 2 (~20 years)
Septage Receiving
Valve 2020 2 1 1 2 2 (~20 years)
General observations for mechanical equipment include:
 Automatic Samplers are enclosed and used infrequently.  Septage Receiving Valves are in good condition.

1.3.1.4 Summary
Based on the scores above, the following pie chart depicts the RUL of the assets of all disciplines. This serves as a quick view for what areas and assets can be considered valuable for the near-term.

Near-Term Projects
The septage station, considering recent piping upgrades, does not need significant attention. Its facilities are likely to last up to the construction and development of the future expansion. The septage station may be considered for use during the Phase 1 expansion with routine maintenance, as noted.

The following near-term project that may be undertaken is shown in Table 1.11.

Table 1.11 Septage Station Near-Term Projects Summary
Asset Importance Repairs Needed Suggested Timeline
Septage Station
Shade Overhang 1
 Coat columns of existing Overhang structure.
 Place protective curb around the base to prevent
water infiltration.
5-10 years
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21

1.3.2 Headworks (including Grit Chamber and Junction Box) The current headworks, built in 1995, consists of an influent junction box, "Box B", bar screens, conveyor belts, valves, a Parshall flume, and a "bypass headworks" (shown as Old Headworks below) used for conveyance to the grit chamber. The grit chamber includes two aerated zones, grit screws, valves, and sump pumps. Figure 1.8 indicates the location of the headworks/grit chambers.

The grit chamber consists of grit screws, sump pumps, airlifts, and valves. The structure is concrete and receives flow from multiple sources in the plant, from headworks, PTFs, and secondary clarifiers. The large recycle flows from the PTFs return to the downstream end of the grit chamber, where the flows mix prior to splitting to primary clarification. The secondary clarifier sludge, intermediate clarifier sludge, and drying bed supernatant, as well as any plant drainage, all return to the head of the grit chamber.

Scores and rankings for the assets are summarized in the following sections per discipline. The discipline-specific scores, in addition to observations of the conditions, are provided.

1.3.2.1 Electrical
Table 1.12 summarizes the assets and the condition of each using the scores discussed above. Only EI&C assets in this area are shown in this section.

Table 1.12 Headworks Electrical Asset Scoring Summary
Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring
Cable
Condition
Equipment
Components Performance General Condition RUL
Gate Actuator G-211 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-212 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-221 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-222 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-231 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-232 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-241 2011 2 2 1 2 3 (10-20 years)
Gate Actuator G-242 2011 2 2 1 2 3 (10-20 years)
Parshall Flume
Flowmeter 2008 2 2 2 2 3 (10-20 years)
Grit Chamber
Flowmeters 2023 2 2 1 1 2 (~20 years)
Proportional Valve
Actuator 1982 2 2 2 2 4 (<10 years)
Selected observations for electrical equipment include:
 Actuators on the gates are in good condition. There is some corrosion on their stand and cover.

Monitor corrosion over time and replace in 10 to 20 years.  Proportional Valve Actuators are in adequate condition. However, they are aging and will likely need a replacement on account of the older equipment.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
Figure 1.8 Headworks and Grit Chamber Process Area Locations VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23

1.3.2.2 Structural
Table 1.13 summarizes the assets and the condition of each using the scores discussed above. Only Structural assets in this area are shown in this section.

Table 1.13 Headworks Structural Asset Scoring Summary
Asset Installation Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Junction Box B 1979/1996/2019 2 1 2 2 2 (~20 years)
Headworks
Structure 1996 3 1 3 3 3 (10-20 years)
Bypass Headworks 1961 2 5 5 5 5 (<5 year)
Grit Chamber
Structure 1982 1 1 2 2 2 (~20 years)
General observations for selected structural equipment include:
 Junction Box B has recently been rehabilitated.
 Headworks Structure has some significant issues. The south slab has settled, the subgrade has eroded, bar screen supports have broken and are missing, and the top slab has cracked in the north side. However, if these repairs are made, the structure should be good for another 20 years.  Bypass Headworks is severely deteriorated. Coatings have entirely degraded, surface corrosion is severe, and numerous spalls are present.

Figure 1.9 shows the Headworks Structure South Slab.

Figure 1.9 Headworks Structure South Slab
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24

1.3.2.3 Mechanical
Table 1.14 summarizes the assets and the condition of each using the scores discussed above. Only mechanical assets in this area are shown in this section.

Table 1.14 Headworks Mechanical Asset Scoring Summary
Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Bar Screen #1 1996 2 2 2 2 3 (~10-20 years)
Bar Screen #2 1996 2 2 2 2 3 (~10-20 years)
Bar Screen #3 2009 2 2 2 2 2 (~20 years)
Conveyor Belt 2009 2 1 1 1 3 (10-20 years)
Conveyor Belt Gear
Reducer N/A 1 2 2 2 3 (10-20 years)
Valve G-211 1996 2 3 2 2 3 (10-20 years)
Valve G-212 1996 2 3 2 2 3 (10-20 years)
Valve G-221 1996 2 2 2 2 3 (10-20 years)
Valve G-222 1996 2 3 3 2 3 (10-20 years)
Valve G-231 2009 2 3 2 2 2 (~20 years)
Valve G-232 2009 2 3 2 2 2 (~20 years)
Valve G-241 1996 2 3 2 2 3 (10-20 years)
Valve G-242 1996 2 3 2 2 3 (10-20 years)
Grit Screw #1 2013 1 1 2 2 3 (10-20 years)
Grit Screw #2 2009 1 1 2 2 3 (10-20 years)
Sump Pump #1 2002 3 3 2 3 4 (<10 years)
Sump Pump #2 2010 2 1 1 1 3 (10-20 years)
Grit Chamber Valve #1 2019 2 2 1 2 2 (~20 years)
Grit Chamber Valve #2 2022 2 2 1 2 2 (~20 years)
Airlifts 2021 1 1 2 1 2 (~20 years)
Proportional 36-inch
Butterfly Valve 1982 3 2 2 2 4 (<10 years)
Headworks Sampler N/A 3 1 2 2 2 (~20 years)
General observations for mechanical equipment include:
 Bar Screens need exterior cleaning.
 Conveyor Belt Gear Reducer rollers may require rehabilitation every 2 to 4 years.  Valves have some corrosion on their operators.
 Proportional 36-inch Butterfly Valve may require a replacement in the short term due to its age.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
Figure 1.10 shows the Inlet Isolation Gates at Headworks.

Figure 1.10 Inlet Isolation Gates at Headworks

1.3.2.4 Summary
Based on the scores above, the following bar chart depicts the RUL of the assets. This serves as a useful tool for what areas and assets can be considered valuable for the near-term.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
Near-Term Projects
The Headworks and Grit Chamber area has some deficiencies that should be addressed immediately.

Table 1.15 illustrates some near-term projects that should be completed in the near-and-medium-term.

Table 1.15 Headworks Area Near-Term Projects Summary
Asset Importance Repairs Needed Suggested Timeline
Bypass Headworks
Structure 1
 Abandon facility. Explore piping or channel alternatives for conveyance.
 If not abandoned, coat and repair concrete across the entire structure. Monitor continuously for leaks and spills.
1-2 years
(as needed)
Headworks Structure 2
 Seal cracks in the top slab. Restore grouting for bar screen supports at the deck.
 Backfill the subgrade of the headworks structure on the south end with pumped slurry. Stabilization of the slope with a retaining wall may be necessary
3-5 years
Grit Chamber
Structure 3
 Reseal all expansion joints along the east and south side of the structure. The east and south sides between the slab on grade and the retaining wall have failed sealants.
5-10 years
Sump Pump #1 4  Clean exterior and monitor the corrosion of the epoxy drive.

Monitor frequently for performance. 5-10 years
Proportional
36-inch Butterfly Valve 5  Due to age, clean exterior, and monitor frequently for performance. Replace if failure occurs. 5-10 years
Proportional Valve
Actuator 6  Due to age, clean exterior, and monitor frequently for performance. Replace if failure occurs. 5-10 years In general, most of the mechanical and electrical equipment is in adequate condition. However, there are many gates and gate actuators that are corroded and may need to be replaced within the next 20 years.

Routine maintenance, including epoxy coating and cleaning of the rust, should be done for almost all equipment, including valves, actuators, and sump pumps, in the next few years.

1.3.3 Primary Clarifiers, Primary Sludge Building, and Intermediate Clarifier The primary clarifiers were constructed in 1982 (#1) and in 2009 (#2), respectively. Each clarifier is of a circular orientation, and both are partially buried. The equipment in the primary sludge building conveys the settled sludge in the primary clarifiers across the plant to the gravity sludge thickeners. The intermediate clarifier is utilized as an additional clarification step. Figure 1.11 indicates where the primary clarifiers and sludge buildings are located.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
Figure 1.11 Primary Treatment Process Area Locations
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28

1.3.3.1 Electrical
The following electrical components analyzed in this process area are shown below. Major electrical equipment locations are shown in Figure 1.11. Table 1.16 provides a summary of the primary clarifier electrical asset scoring.

Table 1.16 Primary Clarifier Electrical Asset Scoring Summary Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring Cable
Condition
Equipment
Components Performance General Condition RUL
MCC-B 2022 2 2 1 2 2 (20 years)
MCC-BB 2022 2 2 1 2 2 (~20 years)
Primary Clarifier Control
Panel N/A 1 1 1 1 1 (>20 years)
General observations for structural equipment include:
 MCC-B and BB are in good condition and were replaced in 2022. The useful life score is based on typical length of electrical assets such as MCCs.

1.3.3.2 Structural
The following structures analyzed in this process area are shown in Table 1.17.

Table 1.17 Primary Clarifier Structural Asset Scoring Summary Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Primary Clarifier #1
Structure 1982 2 2 2 2 1 (>20 years)
Primary Clarifier #1 Bridge 1982 N/A N/A 1 2 1 (>20 years) Primary Clarifier #2
Structure 2009 1 1 1 1 1 (>20 years)
Primary Clarifier #2 Bridge 2009 N/A N/A 1 1 1 (>20 years) Intermediate Clarifier
Structure 1949 2 2 3 3 3 (10-20 years)
Intermediate Clarifier
Bridge 1964 N/A N/A 2 2 2 (~20 years)
Primary Sludge Building
Structure 1982 2 1 2 2 1 (>20 years)
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29
General observations for structural equipment include:
 Primary Clarifiers are in good condition and will last well past new expansions, particularly with regular maintenance.
 Intermediate Clarifier is beginning to show wear in its concrete. There were regularly spaced cracks in the concrete wall that should be sealed and repaired to prevent moisture ingress.  Pipe supports within the Primary Sludge Building have corrosion and missing components. Joint sealants on the perimeter have failed, and the sidewalk has settled a few inches.

Figure 1.12 shows cracks in the Intermediate Clarifier.

Figure 1.12 Cracks in the Intermediate Clarifier
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30

1.3.3.3 Mechanical
Table 1.18 provides a summary of the primary clarifier mechanical asset scoring.

Table 1.18 Primary Clarifier Mechanical Asset Scoring Summary Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Primary Clarifier #1
Mechanism 2012 2 1 1 2 2 (~20 years)
Primary Clarifier #1 Drive 2012 2 1 2 2 2 (~20 years)
Primary Clarifier #2
Mechanism 2009 1 1 1 2 2 (~20 years)
Primary Clarifier #2 Drive 2009 2 1 2 2 2 (~20 years)
Intermediate Clarifier
Mechanism 1964 2 2 2 2 2 (~20 years)
Intermediate Clarifier Drive 2011 2 3 2 2 3 (10-20 years) Primary Sludge Pump #1 1982 2 2 3 2 4 (<10 years)
Primary Sludge Pump #2 2012 2 2 2 2 2 (~20 years)
Primary Sludge Pump #3 2022 1 1 1 1 1 (>20 years)
Intermediate Sludge Pump 1982 2 2 2 2 4 (<10 years)
Blower #1 2009 1 2 3 2 3 (10-20 years)
Blower #2 2009 1 2 2 3 3 (10-20 years)
Blower #3 2022 1 2 1 2 2 (~20 years)
Primary Sump Pump #1 2010-2018 1 1 1 1 2 (~20 years)
Primary Sump Pump #2 2010-2018 2 1 1 1 2 (~20 years)
Primary Scum Pump
(Moyno 8") 2022 1 2 1 1 2 (~20 years)
PTFPS Inlet Gates N/A 2 3 2 3 3 (10-20 years)
General observations for mechanical equipment include:
 Primary Clarifier Mechanisms and Drives are in adequate condition and may last past twenty years into a Phase 1 expansion.
 Intermediate Clarifier Drive has some observable corrosion. Recommendation is to clean and epoxy coat drive and motor.
 Blowers have frequent downtime, leak oil, and their components require more frequent maintenance.

Figure 1.13 shows blowers for the Aerated Grit System located in the Primary Sludge Building.  Primary Sludge Pump #1 is in moderate condition due to its age and should be considered for replacement well before the other sludge pumps.
 PTFPS Inlet Gates have some corrosion on the operators and gates and may not last beyond Phase 1. Provide additional coatings and consider replacement.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31
Figure 1.13 Blowers for the Aerated Grit System Located in the Primary Sludge Building

1.3.3.4 Summary
Based on the scores above, the following bar chart depicts the RUL of the assets. If no number was selected, it is not shown on the chart. This serves as a useful tool for what areas and assets can be considered valuable for the near-term.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
Near-Term Projects
Table 1.19 provides an overview of Near-Term Projects.

Table 1.19 Primary Clarifier Area Near-Term Projects Summary Asset Importance Repairs Needed Suggested Timeline
Intermediate Clarifier
Structure 1
 Seal cracks along concrete exterior to prevent
moisture ingress.
 Monitor concrete condition and repair with
high-strength mortar as needed.
10-20 years
Intermediate Clarifier
Drive 2  Clean rust on the exterior and epoxy coat the drive.  Monitor performance due to age.
3-5 years
Primary Sludge Building
Blowers 3
 Blowers leak oil and experience frequent downtime.

Repair blowers per operations and maintenance
manual requirements if downtime issues persist.
 Monitor performance consistently.
3-5 years
Primary Sludge
Pump #1 4
 Clean exterior and monitor the corrosion.
 The advanced age of this pump may result in a failure; monitor frequently for performance.
5-10 years
PTFPS Inlet Gates 5  Inlet gates are mildly corroded. Provide additional coating for inlet gates. 5-10 years
Primary Sludge Building
Structure 6
 Joint sealants on the sidewalk have failed. Provide
new joint sealants and adjust sidewalk to slab
interface.
5-10 years
Intermediate Sludge
Pump 7
 Clean exterior and monitor the corrosion.
 The advanced age of this pump may result in a failure; monitor frequently for performance
5-10 years
In general, most of the mechanical and electrical equipment is in adequate condition. However, there are specific items of equipment shown in Table 1.19 that will need replacement within about 10 years, some sooner. Epoxy coating and cleaning of any corrosion should be done for most equipment, including valves, actuators, and pumps in the next few years.

The intermediate clarifier structure is currently under consideration for reuse as an equalization basin tank for a utility water system. Accordingly, the repair priority is highest on the list with potential for future repurposing.

1.3.4 Primary Tricking Filters and Primary Trickling Filter Pump Station The PTFs and their pump station serve an important purpose. As shown on Figure 1.2, the trickling filters work in concert with the primary clarifiers, and flow to the trickling filters is provided by pumps in the PTFPS. PTFs primarily consist of their structure, the rotary mechanism, and the media.

Figure 1.14 illustrates what areas the assets shown are located.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Figure 1.14 PTF Process Area
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34

1.3.4.1 Electrical
Table 1.20 provides a summary of the PTF Electrical Assets.

Table 1.20 PTF Electrical Asset Scoring Summary
Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring Cable
Condition
Equipment
Components Performance General Condition RUL
PTFPS Pump #1 Motor 2010 2 1 1 2 2 (~20 years)
PTFPS Pump #2 Motor 2009 3 3 2 2 3 (10-20 years)
PTFPS Pump #3 Motor 2009 2 1 1 2 2 (~20 years)
General observations for electrical equipment include:
 PTFPS Pump #2 Motor cuts out intermittently and causes other pieces of equipment elsewhere in the plant to trip simultaneously. Identified as an issue with the variable frequency drive (VFD). VFD service and investigation is scheduled.

1.3.4.2 Structural
Table 1.21 provides a summary of the PTF Structural Asset Scoring.

Table 1.21 PTF Structural Asset Scoring Summary
Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
PTF #1 Structure 1982 1 1 4 4 3 (10-20 years)
PTF #2 Structure 2009 1 1 1 1 1 (>20 years)
PTFPS Structure 1982 2 5 4 4 4 (<10 years)
General observations for structural equipment include:
 PTF #1 Structure concrete has severe signs of aging, including exposed aggregate, spalling, and cracks along its exterior. In the interior, there are additional cracks. Protective coating and wall rebuild may be required in the next 10 years. However, the condition should be monitored because this structure is not likely to be used once the Phase 1 facilities are in operation.  PTFPS Structure was reported to have interior concrete surfaces with exposed rebar when last observed in 2020. As such, interior concrete may be severely corroded, and coating absent. It is recommended to repair with mortar and protective coating in the near term. Again, this is a structure that is not likely to be needed once the Phase 1 facilities are in operation. But some spot repairs may be needed to maintain the functionality.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35
Figure 1.15 shows PTF #1 Structure showing concrete corrosion and exposed aggregate.

Figure 1.15 PTF #1 Structure Showing Concrete Corrosion and Exposed Aggregate VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36

1.3.4.3 Mechanical
Table 1.22 provides a summary of the PTF Mechanical Asset Scoring.

Table 1.22 PTF Mechanical Asset Scoring Summary
Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
PTF #1 Rotary Distributor 2013 4 4 5 5 5 (<5 years)
PTF #1 Media 2001/2013
(rehab)
N/A N/A 2 2 2 (~20 years)
PTF #2 Rotary Distributor 2009 2 2 1 2 2 (~20 years)
PTF #2 Media 2009 N/A N/A 2 2 2 (~20 years)
PTF Pump Station - Pump
#1
1979/ 2010
(rehab)
2 2 3 3 3 (10-20 years)
PTFPS - Pump #2 2009 1 1 1 2 2 (~20 years)
PTFPS - Pump #3 2009 1 1 1 2 2 (~20 years)
PTFPS - Gate Operators N/A 2 4 3 3 4 (<10 years)
General observations for mechanical equipment include:
 PTF #1 Rotary Distributor is severely corroded to the point of failure. The City noted that a replacement distributor system has been ordered.
 PTF #1 Media had the top two layers replaced in 2013.  PTFPS - Gate Operators have severe corrosion on the handwheel and column. Operators to be replaced in the near term.

Figure 1.16 shows PTF #1 Rotary Distributor to be replaced.

Figure 1.16 PTF #1 Rotary Distributor to be Replaced
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37

1.3.4.4 Summary
Based on the scores above, the following bar chart depicts the RUL of the assets per discipline. This serves as a useful tool for what areas and assets can be considered valuable for the near-term.

Near-Term Projects
The facilities in this area, including the PTFs and their pump station, are not likely to be used in the Phase 1 expansion project because more advanced treatment technology is required to meet the current and future effluent requirements. Generally, the mechanical and electrical equipment in this area, for the most part, is in reasonable condition and is likely to outlast completion of the new Phase 1 facilities, which is good. There are exceptions, and these are shown in Table 1.23. Structurally, however, there are some components that require regular evaluation to confirm that they will not fail prior to the Phase 1 facilities coming online. These are also summarized below.

Table 1.23 PTF Area Near-Term Projects Summary
Asset Importance Repairs Needed Suggested Timeline
PTF #1 Rotary
Distributor 1 Severe corrosion and welding failures. City has started the replacement process. 1-2 years PTF #1 Structure 2
 Repairs spalls and cracks on the exterior.
 Rebuild exterior and interior parapet wall surface
with high-strength mortar and protective coating.
3-5 years
PTF Pump Station
Structure 3
 Examine interior concrete for corrosion and coatings.  Repair interior with high-strength mortar and apply
protective coatings.
3-5 years
PTF Pump Station
Gate Operators 4
 Clean exterior and monitor the corrosion.
 Moderate corrosion observed on the operators.

Replace in the near-term.
3-5 years
The structural components listed above should be monitored closely, and actions should be taken to maintain the concrete integrity so that failure will not occur.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-38

1.3.5 Secondary Trickling Filters and Secondary Trickling Filter Pump Station STFs are two large circular structures with rotary mechanisms. They are of a different orientation than the PTFs, with less vertical height and a much larger diameter. They primarily consist of motors, rotary mechanisms, filter media and a concrete structure. The STFPS is a structure that houses the pumps and conveys flow to the STFs.

As with the PTFs, the STFs are an older treatment technology and on their own, would not be able to achieve the effluent quality needed to meet the new General Order requirements. Therefore, it is unlikely that these facilities will be considered for use in a Phase 1 treatment configuration. However, their performance must be maintained until the new Phase 1 facilities are fully operational.

Figure 1.17 shows the STFs Process Area.

1.3.5.1 Electrical
Table 1.24 provides a summary of the STF Electrical Asset Scoring.

Table 1.24 STF Electrical Asset Scoring Summary
Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring Cable
Condition
Equipment
Components Performance General Condition RUL
STFPS Pump #1 Motor 2010 2 2 2 2 2 (~20 years)
STFPS Pump #2 Motor 2010 2 2 2 2 2 (~20 years)
STFPS Pump #3 Motor 2010 2 2 2 2 2 (~20 years)

1.3.5.2 Structural
Table 1.25 provides a summary of the STF Structural Asset Scoring.

Table 1.25 STF Structural Asset Scoring Summary
Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
STF #1 Structure 1964 2 1 2 3 3 (10-20 years)
STF #2 Structure 1964 2 1 2 3 3 (10-20 years)
STFPS Structure 1961 2 1 2 2 2 (~20 years)
General observations for structural equipment include:
 STFs each have similar issues: longitudinal cracking along the top of the wall with rebar corrosion and spalling, water penetration in the concrete masonry units wall, and degradation of the interior surfaces of the effluent box. These units should be repaired as needed within the next 10 years with high-strength mortar and coatings in order to maintain their performance until the Phase 1 facilities are in operation.
 STFPS Structure has minor concrete cracking. Interior concrete is coated with coal tar epoxy. Unable to be shut down for inspection.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-39
Figure 1.17 STFs Process Area
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-40

1.3.5.3 Mechanical
Table 1.26 provides a summary of the STF Mechanical Asset Scoring.

Table 1.26 STF Mechanical Asset Scoring Summary
Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
STF #1 Rotary
Distributor
1961/2010
(rehab) 2 2 1 2 2 (~20 years)
STF #1 Media 1987 2 2 2 2 2 (~20 years)
STF #2 Rotary
Distributor
1961/2010
(rehab) 2 2 1 1 2 (~20 years)
STF #2 Media 1996 2 2 2 2 2 (~20 years)
STFPS - Pump #1 1979/2010
(rehab) 2 3 3 2 3 (10-20 years)
STFPS - Pump #2 1979/2010
(rehab) 2 3 3 2 3 (10-20 years)
STFPS - Pump #3 1979/2010
(rehab) 2 3 3 3 3 (10-20 years)
Secondary Sludge
Pump #1 2023 1 3 1 2 2 (~20 years)
Secondary Sludge
Pump #2 2012 2 3 1 2 3 (10-20 years)
Secondary Sludge
Pump #3 2024 1 3 1 2 2 (~20 years)
Secondary Scum Pump
(6" Moyno) 2022 1 1 1 1 2 (~20 years))
General observations for mechanical equipment include:
 STFPS Pumps are in moderate to poor condition. There is some corrosion on the baseplate and pipe supports. Piping and enclosures are in good condition, and performance is adequate. With ongoing maintenance, these pumps should maintain their performance until the Phase 1 facilities are in operation.
 STFs Mechanisms and Media are in acceptable condition due to rehabilitation and may last past the expected Phase 1 expansion date with continued monitoring and maintenance.  Secondary Sludge Pumps have significant corrosion on their enclosures. Performance is adequate.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-41

1.3.5.4 Summary
Based on the scores above, the following chart depicts the RUL of the assets in this area. The STF area is in adequate to moderate condition. Electrically, the facilities should last until the Phase 1 plant is in operation. Similarly, much of the mechanical equipment was replaced 12 to 15 years ago and should last for another 10 years with regular ongoing maintenance. The two trickling filter structures are likely to need some repairs to retain their integrity until the Phase 1 facilities are operational.

Near-Term Projects
Table 1.27 provides a summary of the Near-Term Projects. \ Table 1.27 STF Area Near-Term Projects Summary
Asset Importance Repairs Needed Suggested Timeline
STF Structures #1
and #2 1
 Repair cracks and spalls along STF Structures #1
and #2 with high-strength mortar.
 Monitor and track water penetration occurring on the
perimeter of each structure.
 Repair and rebuild interior surfaces of the effluent
boxes exiting from each structure with protective
coatings and high-strength mortar.
5-10 years
STF Pump Station
Structure 2
 Repair cracks on top deck.
 Inspect interior of pump station for coatings.
 Monitor interior for leaks and issues considering
importance of structure.
10-15 years
STF Pump Pipe
Supports 3
 Corrosion has begun to occur.

Clean exterior and coat supports with protective
coatings.
3-5 years
Secondary Sludge
Pumps 4  Clean exterior and monitor the corrosion.
 Monitor performance for potential replacement.
5-10 years
Secondary sludge mechanisms and media are in average to acceptable condition. Continued evaluation of these assets should be made on an ongoing basis.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-42

1.3.6 Secondary Clarifiers
Secondary clarifiers, located directly downstream of the STFs, are the final step of the liquid treatment process. Sludge from the bottom of the clarifier flows to the grit basins and is settled in the primary clarifiers. Effluent is recycled to the STFs via the STFPS, and excess flow is routed to the percolation ponds.

The secondary clarifiers consist of drives, mechanisms, and bridges.

These clarifiers could be considered for utilization as part of the Phase 1 facilities, depending on their condition.

Figure 1.18 indicates where the condition assessment took place in this area.

1.3.6.1 Electrical
There were no explicitly electrical items in the clarifiers. Although the mechanism and drive require electrical components, they are classified as mechanical due to its primary function.

1.3.6.2 Structural
Table 1.28 provides a summary of the Secondary Clarifier Structural Asset Scoring.

Table 1.28 Secondary Clarifier Structural Asset Scoring Summary Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Secondary Clarifier #1
Structure 1964 2 2 2 3 2 (~20 years)
Secondary Clarifier #1
Bridge 2012 2 2 1 1 1 (>20 years)
Secondary Clarifier #2
Structure 1964 2 2 2 3 2 (~20 years)
Secondary Clarifier #2
Bridge 2008 2 2 1 1 1 (>20 years)
Percolation Pond
Pump Station
Structure
2009 1 1 1 1 1 (>20 years)
General observations for structural equipment include:
 Secondary Clarifier Structures have large concrete spalls, minor coating damage, and neither has kickplates on the access platforms. These issues do not compromise the structure but should be repaired when practical.
 Bridges are in good condition.
 Percolation Pump Station Structure was constructed in 2009 and is in good condition, while it remains out of use.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-43
Figure 1.18 Secondary Clarifier Processed Area
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-44
Figure 1.19 shows wear on the Secondary Clarifier #1 concrete.

Figure 1.19 Secondary Clarifier #1 Concrete

1.3.6.3 Mechanical
Table 1.29 provides a summary of the Secondary Clarifier Mechanical Asset Scoring.

Table 1.29 Secondary Clarifier Mechanical Asset Scoring Summary Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Secondary Clarifier #1
Mechanism 1964 3 2 2 2 2 (~20 years)
Secondary Clarifier #1
Drive 2013 3 2 2 2 2 (~20 years)
Secondary Clarifier #2
Mechanism 1964 3 2 2 2 2 (~20 years)
Secondary Clarifier #2
Drive 2012 3 2 2 2 2 (~20 years)
General observations for mechanical equipment include:
 Secondary Clarifier Mechanisms are in adequate condition operationally. The exterior of the mechanism and the drive should be cleaned to reduce intrusion of contaminants to the internal components.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-45

1.3.6.4 Summary
Based on the scores above, the following chart depicts the RUL of the assets in this area of the plant.

Near-Term Projects
Secondary Clarifiers are in acceptable condition. Due to the long lifespan of the secondary clarifier structures and their current condition for all components, consideration of continued use through the Phase 1 expansion should be made. A further assessment will be required before considering these structures for Phase 2.

Table 1.30 provides a summary of some near-term projects.

Table 1.30 Secondary Clarifier Area Near-Term Projects Summary Asset Importance Repairs Needed Suggested Timeline
Secondary
Clarifier #1 and #2
Structure
1 Repair cracks and spalls along STF Structures #1 and #2 with high-strength mortar. Install kickplates on the access guardrail.
10-20 years
Secondary
Clarifier #1 and #2
Pumps and Drives
2 Clean exterior and monitor coating. 10-15 years

1.3.7 Digesters and Thickeners
Digesters and thickeners form the basis of the solids treatment system at the WWTP. This area consists of multiple pieces of equipment and structures that function together to achieve the desired level of treatment. Figure 1.20 indicates the large structures assessed in this area.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-46
Figure 1.20 Solids Handling Process Area
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-47

1.3.7.1 Electrical
Table 1.31 provides a summary of the Solids Handling Electrical Asset Scoring.

Table 1.31 Solids Handling Electrical Asset Scoring Summary Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring Cable
Condition
Equipment
Components Performance General Condition RUL
MCC-D 2022 1 1 2 2 2 (~20 years)
MCC-E 2009 1 1 2 2 3 (10-20 years)
General observations for electrical equipment include:
 MCC-D and E are in good condition.

1.3.7.2 Structural
Table 1.32 provides a summary of the Solids Handling Structural Asset Scoring.

Table 1.32 Solids Handling Structural Asset Scoring Summary Asset Installation
Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Digester #1 Structure 1964 2 2 3 3 4 (<10 years)
Digester #2 Structure 1949-1954 2 N/A 5 5 5 (<5 years)
Digester #3 Structure 1947 2 2 4 4 4 (<10 years)
Digester #4 Structure 2009 1 1 2 1 1 (>20 years)
Digester Control Building #1 Structure 1982 1 1 2 2 1 (>20 years) Digester Control Building #2 Structure 2009 1 2 2 2 1 (>20 years) Sludge Thickener #1 Structure 1964 2 2 2 2 3 (10-20 years) Sludge Thickener #1 Catwalk 1964 N/A 3 3 3 3 (10-20 years) Sludge Thickener #2 Structure 1998 2 2 2 2 2 (~20 years) Sludge Thickener #2 Catwalk 1998 N/A 3 3 3 3 (10-20 years) VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-48
General observations for structural equipment include:
 Digester #1 is one of the two larger-diameter digesters and is in moderate condition. However, it has numerous concrete cracks, spalls and leaks that should be repaired. The interior of the digester has not been assessed in a long time and thus should be inspected shortly. Given the age of the digester and its unknown rehabilitation history, it is possible that the interior may also require repairs and a new coating. Significant maintenance should take place in the short term to allow this digester to function for the next 10+ years.
 Digester #2 has severe issues regarding coating, interior condition, and concrete cracking. The unit is currently out of service and should remain out of service.  Digester #3 is currently in use but has significant coating and concrete issues. Multiple cracks are visible on the exterior, while the interior has not been inspected since installation. Further assessment of interior should be performed, but given that this structure is approaching 70 years old, it is not likely that it will be suitable for service as part of the Phase 1 facilities. Figure 1.21 shows Digester #3 Roof.
 Sludge Thickener Catwalks both have a moderate amount of coating failure. Blasting and recoating should be performed for this equipment in order for service to be maintained.  Digester Control Building #1 has severe corrosion on its pipe supports. Replace anchors, bolts, and other components with stainless steel.

Figure 1.21 Digester #3 Roof
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-49

1.3.7.3 Mechanical
Table 1.33 provides a summary of the Solids Handling Mechanical Asset Scoring.

Table 1.33 Solids Handling Mechanical Asset Scoring Summary Asset Installation
Date
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Sludge Thickener #1
Mechanism 1964 2 2 2 2 2 (~20 years)
Sludge Thickener #1 Drive 2012 2 1 1 1 1 (>20 years)
Sludge Thickener #2
Mechanism 1998 2 2 2 2 2 (~20 years)
Sludge Thickener #2 Drive 2018 2 2 2 2 2 (~20 years)
Gas Mixing Compressor #2 1979 2 2 2 2 4 (<10 years)
Gas Mixing Compressor #3 1979 2 2 2 2 4 (<10 years)
Grinder #1 2009 2 2 2 2 2 (~20 years)
Grinder #2 2009 2 2 2 2 2 (~20 years)
Recirculation Pump #1 1979 2 2 2 2 4 (<10 years)
Recirculation Pump #2 2022 2 2 2 2 2 (~20 years)
Recirculation Pump #3 2024 2 2 2 2 2 (~20 years)
Recirculation Pump #4 1979 2 2 2 2 4 (<10 years)
Recirculation Pump #4
Temp. Control Valve N/A 3 3 3 3 3 (10-20 years)
Heat Exchanger #1 2004 3 3 3 3 3 (10-20 years)
Heat Exchanger #2 2004 3 3 3 3 3 (10-20 years)
Heat Exchanger #3 2004 3 3 3 3 3 (10-20 years)
Heat Exchanger #4 2004 3 3 3 3 3 (10-20 years)
Moyno Thickened Sludge
Pump #1 2023 2 2 2 2 2 (~20 years)
Moyno Thickened Sludge
Pump #2 2019 2 2 2 2 2 (~20 years)
General observations for structural equipment include:
 Heat Exchangers have moderate corrosion and are not performing as well as they should.

Rehabilitation and replacement should be considered in the next 10 to 20 years.  Most of the mechanical equipment listed in this area is in acceptable condition.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-50

1.3.7.4 Summary
Based on the scores above, the following chart depicts the RUL of the assets per discipline in the solids handling area. As noted above, there are scores of 4 and 5 in this area, mostly associated with the structural condition of Digesters 1, 2, and 3. The exception is Digester 4, which is still in good condition with an anticipated RUL of more than 20 years. Electrical and mechanical equipment is in reasonable condition.

Near-Term Projects
Most of the mechanical equipment shown is in acceptable condition. However, continual maintenance and assessments of their performance should proceed.

Table 1.34 provides a summary of some of the major near-term projects to consider.

Table 1.34 Solids Handling Area Near-Term Projects Summary Asset Importance Repairs Needed Suggested Timeline
Digester #2 Structure 1
 Digester #2 Structure has severe issues with its
concrete and corrosion. It is out of service and should remain as such. Consider demolition in the near-term.
1-3 years
Digester #3 Structure 2
 Repair exterior, spalls and cracks with high-strength mortar. Inspect the interior of Digester #3 during an
offline period. Apply protective coatings to the interior.

Monitor for leaks when in service.
5-10 years
Digester #1 Structure 3
 Repair exterior, spalls and cracks with high-strength mortar. Inspect the interior of Digester #1 during an
offline period. Apply protective coatings to the interior.

Monitor for leaks when in service.
5-10 years
Sludge Thickener #1
Structure and Catwalk 4
 Clean exterior, replace corroded bolts or anchors, and monitor corrosion.
 Repair exterior, spalls and cracks with high-strength mortar.
5-10 years
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-51
Asset Importance Repairs Needed Suggested Timeline
Sludge Thickener #2
Structure and Catwalk 5
 Clean exterior, replace corroded bolts or anchors, and monitor corrosion.
 Repair exterior, spalls and cracks with high-strength mortar.
5-10 years
Digester Control
Building 6  Replace anchors, bolts and other components with stainless steel. 10-15 years Mechanical equipment in this area is in adequate condition but is beginning to deteriorate. Rehabilitation should be performed in the areas noted in the near-term to maintain structural integrity and performance until completion of the Phase 1 facilities. Regular monitoring of the condition of the pipe supports should also be performed. Realistically, only Digester 4, the two digester control buildings, and Solids Thickener #2 could be considered for potential inclusion in the facilities for the Phase 1 or Phase 2 plant configuration.

1.3.8 Operations/Administration/Plant Facilities
A condition assessment of the plant facilities was also conducted. A warehouse, plant facility water system, generators, and other administration sites were analyzed.

The general plant facilities are shown in Figure 1.22.

1.3.8.1 Electrical
Table 1.35 provides a summary of the Administrative/Site Facilities Electrical Asset Scoring.

Table 1.35 Administration/Site Facilities Electrical Asset Scoring Summary Asset Installation
Date
Electrical Specific Scores Overall Scores
Wiring
Cable
Condition
Equipment
Components Performance General Condition RUL
Emergency Generator #1 2009 2 3 1 2 2 (~20 years)
Operations Building AC
Units N/A 2 3 3 4 4 (<10 years)
General observations for electrical equipment:
 Emergency Generator #1 has had some observable corrosion on the exterior of the enclosure on its equipment components. It is functional otherwise.
 AC Units in the Operations Building are severely deteriorated and require replacement.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-52
Figure 1.22 Administration/Plant Facilities Process Area VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-53

1.3.8.2 Structural
Table 1.36 provides a summary of the Administration/Site Facilities Structural Asset Scoring.

Table 1.36 Administration/Site Facilities Structural Asset Scoring Summary Asset Installation Date
Structural Specific Scores Overall Scores
Foundation Coating Performance General
Condition RUL
Standby Water Well 1979/2022/2023 2 2 3 3 3 (10-20 years) Operations Building 1982 1 2 2 2 1 (>20 years)
Maintenance Shop
(Warehouse) 1947/1961/1979 1 2 2 3 3 (10-20 years)
Storage Building 1996 2 2 2 3 2 (~20 years)
Boiler Area Building N/A 2 2 4 3 3 (10-20 years)
Gas Flares N/A 2 2 3 3 3 (10-20 years)
Ferrous Chloride
Tank 2013 N/A N/A 2 2 2 (~20 years)
 Standby Water Well piping system has moderate to severe corrosion. Many of the pipe supports in this system are missing anchors and nuts. Replacement and repair of pipe supports should proceed to maintain the system in good condition as a standby water source. A new water pipeline has been constructed to the site and provides the primary source of water for the plant moving forward.  Maintenance Shop (Warehouse) does not have a standard roof drain resulting in water ponding and other issues. Figure 1.23 shows ponding on the Maintenance Shop Roof. Add a roof drain and replace the scuppers in lieu of the roof. The lintel above the roll-up door is damaged and needs to be repaired.
 Storage Building has some immediate maintenance concerns. Door vents, louvers, steel screws, and appurtenance support have severe corrosion. Further, there are roof leaks amongst ridge vents on the southern half of the building.
 Some Gas Flare Supports have spalling and require minor concrete repairs.  Boiler Area Building has moderate corrosion on steel framing and pipe supports. The exhaust stack requires structural bracing.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-54
Figure 1.23 Maintenance Shop Roof Ponding

1.3.8.3 Mechanical
Table 1.37 provides a summary of the Administration/Site Facilities Mechanical Asset Scoring.

Table 1.37 Administration/Site Facilities Mechanical Asset Scoring Summary Asset Installation
Dates
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Facility Water Pump N/A 2 1 1 2 2 (~20 years)
Propane Gas/Boiler 2005 3 4 2 3 3 (10-20 years)
Facility Drainage Sump Pump #1 2012 3 2 3 2 4 (<10 years) Facility Drainage Sump Pump #2 2012 3 2 3 2 4 (<10 years) Facility Air Compressor #1 2008 2 2 2 2 2 (~20 years)
Facility Air Compressor #2 2008 2 2 2 2 2 (~20 years)
Grinder #1 2009 2 2 2 2 2 (~20 years)
Grinder #2 2009 2 2 2 2 2 (~20 years)
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-55
Asset Installation
Dates
Mechanical Specific Scores Overall Scores
Exterior Corrosion Performance General
Condition RUL
Ferrous Chemical Feed System 1994/ 2020
(rehab) N/A N/A 2 2 2 (~20 years)
Flare #1 2010 N/A N/A 2 3 3 (10-20 years)
Flare #2 1990 N/A N/A 2 3 3 (10-20 years)
Flame Trap #1-6 1990 N/A N/A 2 2 2 (~20 years)
Sediment Trap #1-3 1990 N/A N/A 2 3 3 (10-20 years)
Supernatant pump 2013 2 2 2 2 2 (~20 years)
Most mechanical equipment is in reasonable condition. General observations about mechanical equipment in poorer condition include:
 Facility drainage sump pumps are aging, and the condition may deteriorate quickly without consistent maintenance. Replacement within 10 years may be required.  Flares #1-2 have some performance issues and may require replacement within 10 years.

1.3.8.4 Summary
Based on the scores above, the following chart depicts the RUL of the assets. As noted, for the most part, the assets have a remaining life expectancy of about 20 years. The operation building has a life expectancy of more than 20 years. There are some components that require maintenance in the short-term, as detailed below.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-56
Near Term Projects
To maintain the existing facilities the projects outlined in Table 1.38 should be considered.

Table 1.38 Administration and Plant Facilities Area Near-Term Projects Summary Asset Importance Repairs Needed Suggested Timeline
Storage Building
Structure 1
 Seal roof leaks on the southern half of the building.

Replace corroded steel screws across the entire
building.
 Replace ridge vents with corrosion.
 Replace all door vents, louvers, and appurtenance
supports. All have severe corrosion.
 Replace the satellite dish support above the east
entrance as soon as possible
3-5 years
Maintenance Shop
Structure 2
 Southern half of the roof has no roof drain.
 Add roof drain and replace corroded scuppers.
 Repair mid-span of the lintel above the roll-up door. 3-5 years
Boiler Area Building
Overhang 3  Replace corroded pipe supports in overhang.  Provide structural bracing on the exhaust stack.
3-5 years
Facility Drainage
Sump Pumps 4  Clean exterior, replace corroded bolts or anchors, and monitor corrosion. 3-5 years Standby Water Well 5  Clean exterior, replace corroded bolts or anchors, and monitor corrosion. 5-10 years

1.3.9 Piping and Underground Facilities
Throughout the condition assessment, there was concern expressed by plant staff and the engineers regarding the condition of buried piping and electrical conduits. Piping and electrical conduits have been installed and replaced intermittently alongside the construction of other plant facilities. However, the older facilities and structures have piping and conduits that have been in use since 1961. Considering the upcoming site expansion, identifying areas that have degraded piping and conduits will be critical for maintaining existing plant operations.

1.3.9.1 Piping
The City's WWTP, like other WWTPs, utilizes buried piping, and reinforced concrete pipe (RCP) is a common piping material used. RCP has a typical life expectancy of 75 to 100 years in a sewer collection system, so should last for a similar length of time in a WWTP. The oldest RCP installed at the plant was installed in 1961, making it 63 years old now, still well within its anticipated life expectancy.

However, observational factors at the plant suggest that corrosion has begun to degrade some of the existing piping. For example, the 1979 digester feed sludge piping had to be replaced after corroding from the outside.

Plant staff also indicate performance-based parameters that indicate degradation and corrosion. For example, the smell of odorous compounds at pipe discharges and reduced flow capacities during high flow events.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-57
The following list indicates the areas on site that still use buried RCP pipe installed in 1961:
 42-inch RCP pipe from STF #1 and #2 to SC #1 and #2.
 36-inch Effluent RCP pipe from SC #2 to overflow box and percolation ponds.  24-inch Bypass effluent RCP pipe from SC #2 to overflow box.  36-inch RCP piping to STFs from STFPS.
 36-inch RCP piping in between SC #1 and SC #2.

The following list indicates piping that has buried RCP pipe installed in 1979:
 Digester feed sludge piping was rotting from the outside-in and replaced.  42-inch RCP with polyvinyl chloride (PVC) liner to Bypass Headworks.  42-inch RCP pipe from Grit Chamber to Primary Clarifier #1.  42-inch RCP pipe from Primary Clarifier #1 to PTFPS (replaced with plastic in 2008).  36-inch RCP piping between STFPS and PTFPS.
 30-inch RCP from Secondary Clarifier launders to STFPS.

There is significant difficulty replacing buried piping during ongoing treatment operations. For example, the effluent 36-inch RCP pipe to the percolation ponds runs underneath the sludge drying beds and would require significant coordination to replace. As such, monitoring pipe performance will be vital to maintain potentially damaged pipe until plant expansions can be completed.

It is suggested that a closed-circuit television (CCTV) inspection of buried 1961 and 1979 RCP piping be conducted for the areas mentioned above. CCTV inspections involve placing a camera within the pipe with recorded video functionality. This permits engineers to review the extent of potential damage to underground piping.

1.3.9.2 Electrical Conduits and Conductors
The WWTP utilizes both aboveground and buried conduits. Conduits aboveground are typically encased in PVC, whereas underground conduits have concrete encasements and vaults. Due to the saline air in Santa Maria, the operations teams have observed that most aboveground conduits are beginning to degrade, even those installed within the last 20 years.

Most of the aboveground conduits are experiencing corrosion, including in the following locations:
 Thickener 2 conduits.
 Headworks conduits.
 Conduits to Primary Clarifier #1.
 Conduits to Digester #4.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-58
With regards to underground conduits, their condition is less obvious. Most of the older conduits were installed in 1979, so are now 45 years old. Typically, copper conductors have a life of about 30 years. The limiting factor is usually the coating around the copper, which begins to degrade. So, wiring installed in the 1979 expansion would be in need of replacement, irrespective of the condition of the conduit. The following underground conduits have failed, needed replacement, or are a cause for concern:
 Digester Control Building #1 to Supernatant pit conduits:
» The existing galvanized conduit shorted and was replaced with a replacement conduit.  Primary Sludge Building conduits to STF Pump Station conduit vault:
» Conduits shorted:
 A new vault and duct bank with three 2-inch conduits was installed below ground recently (2019-2022). One of those conduits is being used as a spare.

In general, underground conduits should be closely monitored. Any shorting may result in immediate emergency projects. Inspections and repairs of underground conduits should be included as part of new equipment installations.

1.4 Summary and Recommendations
The purpose of the condition assessment was twofold. Firstly, to identify existing facilities that would need to be repaired or replaced to provide an operating WWTP that would meet the interim permit limits until such time as the Phase 1 expansion facilities are built and operational.

Second, the purpose was to identify the facilities and assets on the existing WWTP site that may have the potential to be incorporated into the planning effort for the Phase 1 and possibly Phase 2 expansions, that would increase the plant capacity to meet the needs through 2060.

The results of the condition assessment indicate that there are facilities with the existing plant that will require maintenance and/or replacement in the short term. A list of those projects is included in Table 1.39 and in Appendix A. Also, the results show that there is a limited number of structures and facilities within the general process areas that should be considered for inclusion in the future plant expansions. Structural scores are the foundation for this summary due to the longer lifespan of concrete.

There is an expectation that mechanical equipment will likely be replaced on a continual periodic basis as its condition demands. Phase 1 of the plant expansion should be complete around 2033, and Phase 2 is expected to be completed around 2052. Using the RUL criteria as the base metric, Figure 1.24 was developed to illustrate which process areas should be considered for inclusion in the Phase 1 and Phase 2 expansion timelines. Typically, facilities that should be considered in Phase 1 are those with a score of 2 as RUL, that is a RUL of 10 to 20 years, and the facilities that should be considered in Phase 1 and Phase 2 are those with a score of 1, that is a RUL of greater than 20 years.

Table 1.39 presents a summary of all the major facilities. It lists the year of construction, the current age, the anticipated typical structural lifetime, the estimated RUL, and then whether the facility/structure should be considered as part of the Phase 1 and/or Phase 2 expansion.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-59
Figure 1.24 Existing Facilities for Potential Use in Phase 1 and Phase 2 VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-60
Table 1.39 Summary of Findings Indicating Potential Structural Facilities for Consideration in the Phase 1 and/or Phase 2 Expansions Process Area Structure Year of
Construction
Current Age
(years)
Typical Structural
Lifetime
(years)
Estimated Structure
Remaining Lifetime
(years)
2033
(Phase 1
Expansion)
2052
(Phase 2
Expansion)
Septage Recirculation Area
Septage Receiving Station 2020 4 ~ 75 40-50 Yes Yes
Headworks Area
Junction Box B 1979/1996/2019
(rehabbed)
38 50-70 20-40 Yes No
Headworks 1996 28 50-70 20-40 Yes No
Grit Chamber 1979 45 50-70 5-25 Yes No
Bypass Headworks 1961 63 50-70 <5 No No
Primary Clarifier Area
Primary Clarifier #1 1982 42 ~ 80 ~ 40 Yes Yes
Primary Clarifier #2 2009 15 ~ 80 ~ 65 Yes Yes
Intermediate Clarifier 1949 75 ~ 80 ~ 20 No No
Primary Sludge Building 1982 42 ~ 75 ~ 30 Yes Yes
Primary Trickling Filter Area
PTF #1 1982 42 ~ 75 ~ 30 No No
PTF #2 2009 15 ~ 75 ~ 50 Yes Yes
PTFPS 1982 42 ~ 75 ~ 30 No No
Secondary Trickling Filter Area
STF #1 1964 60 ~ 75 ~ 10 No No
STF #2 1964 60 ~ 75 ~ 10 No No
STFPS 1962 62 ~ 75 ~ 10 Yes No
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-61
Process Area Structure Year of
Construction
Current Age
(years)
Typical Structural
Lifetime
(years)
Estimated Structure
Remaining Lifetime
(years)
2033
(Phase 1
Expansion)
2052
(Phase 2
Expansion)
Secondary Clarifier Area
Secondary Clarifier #1 1964 60 ~ 90 ~ 30 Yes No
Secondary Clarifier #2 1964 60 ~ 90 ~ 30 Yes No
Percolation Pond Pump Station 2009 15 ~ 80 ~ 65 Yes Yes Solids Handling Area
Digester #1 1964 60 ~ 75 ~ 15 No No
Digester #2 1947-1954 ~68 ~ 75 0 No No
Digester #3 1947 77 ~ 75 ~ 10 No No
Digester #4 2009 15 ~ 75 ~ 60 Yes Yes
Sludge Thickener #1 1964 60 ~ 75 ~ 15 No No
Sludge Thickener #2 1998 26 ~ 75 ~ 50 Yes No
Digester Control Building #1 1982 42 ~ 80 ~ 40 No No
Digester Control Building #2 2009 15 ~ 80 ~ 65 Yes Yes
Administration and Plant Facilities Area
Operations Building 1982 42 ~ 80 ~ 40 Yes Yes
Maintenance Shop (Warehouse) 1982 42 ~ 80 ~ 40 Yes No
Storage Building 1996 28 ~ 80 ~ 50 Yes No
Boiler Area Building - - - 60 No No
VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-62
In summary, structures for potential use in Phase 1 and Phase 2 that have a RUL > 30 years - shaded green in Figure 1.24, are shown below:
 Septage Receiving Area.
 Percolation Pond Pump Station.
 Operations Building.
 Primary Sludge Building.
 Primary Clarifier #1 and #2.
 PTF #2.
 Digester #4.
 Digester Control Building #1 and #2 Structures.

The above structures were assessed to be in good condition and should last beyond 2050 with regular maintenance and upkeep.

Similarly, structures for potential use in Phase 1 only, that have a RUL of 10 to 20 years, and could last until the Phase 2 expansion takes place, are shaded orange in Figure 1.24 and are listed below:
 Junction Box B.
 Grit Chamber.
 Storage Building.
 Secondary Clarifier #1 and #2.
 STFPS.
 Sludge Thickener #2.

Other structures on the site could potentially be demolished once the Phase 1 facilities are built, which would provide space for construction of future technologies that align with the chosen treatment technology for Phase 1.

There are some structures that are not currently slated for re-use as part of the Phase 1 or Phase 2 expansions, but may be re-used given adequate rehabilitation. For example, the intermediate clarifier is under consideration for use as an equalization basin in a future utility water system. The details of some of these items are presented in later chapters, such as in Volume 13.

These results inform us what processes and design decisions should be made considering future treatment trains. Using the results, a phased approach to construction and implementation of new treatment may reduce costs and construction complexity. For example, if the secondary clarifiers can be preserved through the Phase 1 expansion, it will reduce capital outlays, improve funding prospects, and allow for a more targeted treatment train for permit compliance.

Appendix A identifies recommended short-term capital improvement projects to address to keep the facility in working condition until Phase 1 expansion upgrades are completed.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-63
This condition assessment provided a range of scores for mechanical and electrical equipment. Refer to individual sections above for analysis of mechanical and electrical equipment conditions. Generally, most equipment was in adequate/acceptable condition and may be considered for usage during Phase 1 expansion. However, replacements should proceed as needed for these components. Near-term repairs are listed for consideration in the near-term.

Finally, it is important for a condition assessment similar to this one to be repeated on a 3-year basis to track the status of individual assets.

VOLUME 4 / CHAPTER 1: CONDITION ASSESSMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A NEAR-TERM PROJECT CIP ESTIMATES
FY 2024-2028 FY 2029-2031 Notes
Priority
100 Area 1 3 Septage Station Rehabilitation $ 27,000 $ - $ 27,000 Low priority 200 Area 2- 1A, Area 2- 1B, Area 2- 1C, Area 2-1E 1 Headworks Rehabilitation - Phase 1 $ 386,000 $ 18,000 $ 368,000 250 Area 2-1D 3 Headworks Rehabilitation - Phase 2 $ 112,000 $ - $ - $ 112,000 May defer to Phase 1 Contractor's Scope300 Area 3- 1A, Area 3-1B, Area 3-1C, Area 3-1D, Area 4-1A, Area 4-1B, Area 4-1C 2 Primary Trickling Filter, Pump Station, and Primary Clarifier Rehabilitation $ 411,000 $ 154,000 $ - $ 257,000 400 Area 5-1A, Area 5-1B, Area 5-1C, Area 5-1D 1 Secondary Trickling Filter Rehabilitation $ 181,000 $ - $ 181,000 $ - 500 Area 6-1A, Area 6-1B, Area 6-1C 2 Secondary Clarifier Rehabilitation $ 144,000 $ - $ 144,000 $ - 600 Area 7-1A, Area-7-1D 2 Digester Rehabilitation - Phase 1 $ 580,000 $ 11,000 $ 569,000 $ - 650 Area 7-1B, Area 7-1C 3 Digester Rehabilitation - Phase 2 $ 156,000 $ - $ - $ 156,000 700 Area 8-1A, Area 8-1D 2 Plant Facilities Projects - Phase 1 $ 459,000 $ 9,000 $ 450,000 $ - 750 Area 8-1B, Area 8-1C 3 Plant Facilities Projects - Phase 2 $ 118,000 $ - $ - $ 118,000 Area 1 Area 1 3 Septage Station - Clean and coat Columns $ 27,000 $ - $ - $ 27,000 Area 2 - 1A Area 2 - 1A 1 Headworks - Repairs to slab and provide backfill $ 234,000 $ - $ 234,000 $ - Area 2 - 1B Area 2 - 1B 1 Grit Chamber Structure - Repairs to expansion joints $ 89,000 $ - $ 89,000 $ - Area 2 - 1C Area 2 - 1C See O&M Clean and Replace Sump Pump #1 $ 18,000 $ - budget incorporated into routine O&M Area 2 - 1D Area 2 - 1D 2 Clean and Replace Proportional Butterfly Valve $ 112,000 $ - $ - $ 112,000 Maintain until Phase 1 expansion Area 2 - 1E Area 2 - 1E 2 Proportional Valve Actuator $ 45,000 $ - $ 45,000 $ - Area 3- 1A Area 3- 1A 3 Intermediate Clarifier Structure $ 45,000 $ - $ - $ 45,000 Changed to Low Priority Area 3 - 1B Area 3 - 1B 3 Intermediate Clarifier Drive $ 20,000 $ - $ - $ 20,000 Changed to Low Priority Area 3 - 1C Area 3 - 1C See O&M Primary Sludge Building Blowers $ 47,000 budget incorporated into routine O&M Area 3 - 1D Area 3 - 1D 3 Primary Sludge Building Structure $ 27,000 $ - $ - $ 27,000 Area 3- 1E Area 3- 1E - Primary Sludge Pump #1 $ - $ - $ - $ - Project complete Area 4 - 1A Area 4 - 1A 3 PTF #1 Structure $ 89,000 $ - $ - $ 89,000 Monitor, reassess biannually.

Area 4 - 1B Area 4 - 1B 1 PTF Pump Station Structure $ 76,000 $ - $ - $ 76,000 Area 4 - 1C Area 4 - 1C See O&M PTF Pump Station Operators $ 107,000 $ - budget incorporated into routine O&M Area 4- 1D Area 4- 1D - PTF #1 Rotary Distributor $ - $ - $ - $ - Project complete Area 5 -1A Area 5 -1A 1 STF #1 Structure $ 67,000 $ - $ 67,000 $ - Area 5-1B Area 5-1B 1 STF #2 Structure $ 67,000 $ - $ 67,000 $ - Area 5 - 1C Area 5 - 1C 1 STF Pump Station Structure $ 27,000 $ - $ 27,000 $ - Area 5 - 1D Area 5 - 1D 1 STF Pump Pipe Supports $ 20,000 $ - $ 20,000 $ - Change to High Priority for grouping Area 5-1E Area 5-1E - Secondary Sludge Pumps 1 and 3 $ - $ - $ - $ - Project complete Area 5-1F Area 5-1F - Secondary Sludge Pump 2 $ - $ - $ - $ - Project complete Area 6 - 1A Area 6 - 1A 1 Secondary Clarifier #1 Structure $ 22,000 $ - $ 22,000 $ - Area 6 -1B Area 6 -1B 1 Secondary Clarifier #2 Structure $ 22,000 $ - $ 22,000 $ - Area 6 - 1C Area 6 - 1C 2 Mechanical Pumps and Drives $ 100,000 $ - $ 100,000 $ - Area 7-1A Area 7-1A 1 Digester #1 and 3 Structures $ 569,000 $ - $ 569,000 $ - Minimized expenditure on Dig #3 Area 7-1B Area 7-1B 3 Sludge Thickener #1 Structure and Catwalk $ 78,000 $ - $ - $ 78,000 ST #1 is from 1961 Area 7-1C Area 7-1C 3 Sludge Thickener #2 Structure and Catwalk $ 78,000 $ - $ - $ 78,000 Area 7-1D Area 7-1D See O&M Digester Control Building $ 11,000 $ - budget incorporated into routine O&M Area 8-1A Area 8-1A 2 Storage Building Structure $ 450,000 $ - $ 450,000 $ - Area 8-1B Area 8-1B 3 Maintenance Shop Structure $ 31,000 $ - $ - $ 31,000 Area 8-1C Area 8-1C 3 Maintenance Shop Structure $ 87,000 $ - $ - $ 87,000 Area 8-1D Area 8-1D See O&M Facility Drainage Sump Pumps $ 9,000 $ - budget incorporated into routine O&M CIP Total $ 2,574,000 $ 192,000 $ 1,712,000 $ 670,000
O&M costs $ 192,000Phase Totals $ 2,382,000 -- $ 1,712,000 $ 670,000 Priority (1 (high) to
3 (low) scale) Proposed CIP Project Number Individual Project Identifiers Project Name CIP Cost Estimate(1, 2,3) ($) Cost to O&M budget CIP Cost by Fiscal Year and Phase ($) List of Individual Projects
Notes:(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 4.375% for sales tax of the baseline cost. (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Table Detailed Capital Improvement Program
City of Santa Maria
Near-Term Improvements for WWTP

WASTEWATER TREATMENT PLANT PROGRAM
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 1
Project Name: Septage Station - Clean and coat ColumnsSystem Type: WastewaterProject Description:
$ 12,000 $ 21,000 $ 27,000 2030
Project Detail:

Percent Cost ($)
100% 27,000$
0% $ - 100% 27,000$
Notes on Cost Estimation:

Project
Schedule
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Miscellaneous
Project Cost Allocation:

Notes:(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Coat columns of existing Overhang structure. Place protective curb around the base to prevent water infiltration.

Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
Project Element ($/ft)Reimbursement Category
Existing Users
Total
Future Users
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 2 - 1A
Project Name: Headworks - Repairs to slab and provide backfillSystem Type: WastewaterProject Description:
$ 105,000 $ 180,000 $ 234,000 2026
Project Detail:

Percent Cost ($)
100% 234,000$
0% $ - 100% 234,000$
Notes on Cost Estimation:

Existing Users
Future Users
Total
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 This project involves sealing cracks in the top slab. Restore grouting for bar screen supports at the deck.

Backfill the subgrade of the headworks structure on the south end with pumped slurry. Stabilization of the slope with a retaining wall may be necessary. Add coating to headworks automatic valve actuators.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Miscelaneous Repairs
Notes:

Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 2 - 1B
Project Name: Grit Chamber Structure - Repairs to expansion jointsSystem Type: WastewaterProject Description:
$ 40,000 $ 69,000 $ 89,000 2027
Project Detail:

Percent Cost ($)
100% 89,000$
0% $ - 100% 89,000$
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Reseal all expansion joints along the east and south side of the structure. The east and south side between the slab on grade and the retaining wall have failed sealants.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Miscelaneous Repairs
Notes:

Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 2 - 1C
Project Name: Clean and Replace Sump Pump #1System Type: WastewaterProject Description:

Replace 1 $ 8,000 $ 14,000 $ 18,000 2030
Project Detail:

Percent Cost ($)
100% 18,000$
0% $ - 100% 18,000$
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Cost from Santa Maria provided Cost tables. Previous cost based on 2013 estimate. Replacement should occur by 2030 Project Cost Allocation:

Reimbursement Category
Existing Users
Future Users
Total
Notes:

Exterior of Sump Pump #1 needs to be cleaned. Included cost assumes full replacement by the project date.CProject Element Proposed
Power
(hp)
Proposed
Capacity
(gpm)
Replace/
New
Proposed
Number
of Pumps Unit Cost(1)
($/gpm)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Pump
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 2 - 1D
Project Name: Clean and Replace Proportional Butterfly Valve System Type: WastewaterProject Description:
$ 50,000 $ 86,000 $ 112,000 2030
Percent Cost ($)
100% 112,000$
0% $ - 100% 112,000$
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
https://www.ferguson.com/category/valves/butterfly-valves/?customsort=sku_sales_i%20desc&prefn1=sku_Valve_Size_ss&prefv1=36%2Bin&srsltid=AfmBOoqvxNvT6vzuGV7WwVRRCSjIohD96a2dK9o9aPJbWNtcmvWyPqK- (1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation: Project Detail:

Clean exterior and monitor performance. Replace at failure, expected in 2030. Butterfly valve is 36". Will require a complete shutdown to replace. May defer to Phase 1 contractor scope. Project Element Notes:

Project Details:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Butterfly Valve
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 2 - 1E
Project Name: Proportional Valve ActuatorSystem Type: WastewaterProject Description:
$ 20,000 $ 34,000 $ 45,000 2026
Project Detail:

Percent Cost ($)
100% 45,000 $
0% $ - 100% 45,000 $
Notes on Cost Estimation: Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Due to age, clean exterior and monitor frequently for performance. Replace if failure occurs.Project Details:Project Element Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Miscallenous
Notes:

Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 3 - 1A
Project Name: Intermediate Clarifier StructureSystem Type: WastewaterProject Description:
$ 20,000 $ 34,000 $ 45,000 2029
Project Detail:

Percent Cost ($)
100% 45,000 $
0% $ - 100% 45,000 $
Notes on Cost Estimation:Total
Project Cost Allocation:

Reimbursement Category
Existing Users
Future Users
Seal cracks along concrete exterior to prevent moisture ingress. Monitor concrete condition and repair with high strength mortar as needed.

Concrete Repairs
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Details:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Project Element Schedule
Notes:

Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 3 - 1B
Project Name: Intermediate Clarifier DriveSystem Type: WastewaterProject Description:
$ 9,000 $ 15,000 $ 20,000 2029
Percent Cost ($)
100% 20,000 $
0% $ - 100% 20,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation: Project Detail:

Project Element
Notes:

Clean rust on the exteror and epoxy coat the drive. Monitor performance due to ageProject Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Miscallenous repairs
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 3 - 1CProject Name: Primary Sludge Building BlowersSystem Type: WastewaterProject Description:
$ 4,000 $ 7,000 $ 9,000 2028
$ 17,000 $ 29,000 $ 38,000 2030
Percent Cost ($)
100% 47,000$
0% $ - 100% 47,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation: Project Detail:

Project Element
Notes:

Blowers leak oil and experience frequent downtime. Repair blowers per O&M methods manual requirements if downtime issues persist. Monitor performance consistently.Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Mechanical repairsReplacement
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 3 - 1D
Project Name: Primary Sludge Building StructureSystem Type: WastewaterProject Description:
$ 12,000 $ 21,000 $ 27,000 2029
Project Detail:

Percent Cost ($)
100% 27,000 $
0% $ - 100% 27,000 $
Notes on Cost Estimation:

Notes:

Joints sealants on the sidewalk have failed. Provide new joint sealants and adjust sidewalk to slab interface. Address basement vent fan, access hatch and eave issues Miscallenous
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
Future Users
TotalProject Details:

Proposed
Diameter
(in)
Replace/
New
Project
Project Element Schedule
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 3 - 1E
Project Name: Primary Sludge Pump #1System Type: WastewaterProject Description:
$ 11,000 $ 19,000 $ 25,000 2029
Percent Cost ($)
100% 25,000$
0% $ - 100% 25,000$
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation: Project Detail:

Project Element
Notes:

Clean exterior and monitor the corrosion. The advanced age of this pump may result in a failure; monitor frequently for performance. Project complete in 2024. Project Details:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Miscallenous Repairs
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 4 - 1A
Project Name: PTF #1 StructureSystem Type: WastewaterProject Description:
$ 40,000 $ 69,000 $ 89,000 2029
Project Detail:

Percent Cost ($)
100% 89,000 $
0% $ - 100% 89,000 $
Notes on Cost Estimation:

Notes:

Repair spalls and cracks on exterior. Rebuild exterior and interior parapet wall surface with high-strength mortar and protective coating. Assumes half surface is covered at 50$/SF. Structure is 60ft in diameter with 12ft media height. Full replacement may not be required at current level of severity .

Monitor and reassess biannually.

Concrete Repairs
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Existing Users
Capital
Improvement
Cost(3)
($)
Project
Project Element Schedule
Replace/
New
Project Details:

Proposed
Capacity
(gpm)
Unit Cost(1)
($)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Future UsersTotal
assumes 50$/SF per Carollo projects. About 1780 SF would be repaired in this scenario from 7918 SF of structure (2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 4 - 1B
Project Name: PTF Pump Station StructureSystem Type: WastewaterProject Description:
$ 34,000 $ 58,000 $ 76,000 2029
Project Detail:

Percent Cost ($)
100% 76,000 $
0% $ - 100% 76,000 $
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Examine interior concrete for corrosion and coatings. Repair interior with high-strength mortar and apply protective coatings. Interior is badly corroded. Will require bypass and coordination. Reapirs of inside concrete walls will require reinstallation of all media. Monitor and re-assess. Replacement of media may not be justified considering structure to be demolished in Phase 1Project Details:Project Element Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete repairs
Notes:

Existing Users
Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 4 - 1C
Project Name: PTF Pump Station OperatorsSystem Type: WastewaterProject Description:
$ 48,000 $ 82,000 $ 107,000 2027
Project Detail:

Percent Cost ($)
100% 107,000 $
0% $ - 100% 107,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
Project Cost Allocation:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Miscallenous
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project
Schedule
Clean exterior and monitor the corrosion. Moderate corrosion observed on the operators. Replace in the near-term. 3 repairs needed. Cost reflects rehab of some operators and pump replacement.Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
Project Element ($/ft)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 4 - 1D
Project Name: PTF #1 Rotary DistributorSystem Type: WastewaterProject Description:
$ 112,000 $ 192,000 $ 250,000 2025
Percent Cost ($)
100% 250,000$
0% $ - 100% 250,000$
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total actual cost provided by City.
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Project Element
Notes:

The City has begun replacing this. Severe corrosion and welding failures. Parts have been ordered and cost reflects actual price. Project complete in 2024/2025Project Details:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Distributor
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5- 1A
Project Name: STF #1 StructureSystem Type: WastewaterProject Description:
$ 30,000 $ 51,000 $ 67,000 2028
Project Detail:

Percent Cost ($)
100% 67,000 $
0% $ - 100% 67,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
TotalAssumes 50$/SF. The size of the STF is 180 ft diameter with 3.3 ft of height. Assumes about 1800 SF of repairs required.

Project Cost Allocation:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Concrete Repairs
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project
Schedule
Repair cracks and spalls along STF Structures #1 and #2 with high-strength mortar. Monitor and track water penetration occurring on the perimeter of each structure. Repair and rebuild interior surfaces of the effluent boxes exiting from each structure with protective coatings and high-strength mortar. Coat bypass manhole structures.Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
Project Element ($/ft)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5- 1B
Project Name: STF #2 StructureSystem Type: WastewaterProject Description:
$ 30,000 $ 51,000 $ 67,000 2028
Project Detail:

Percent Cost ($)
100% 67,000$
0% $ - 100% 67,000$
Notes on Cost Estimation:

STF #2 Structure
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
Future Users
Total
Capital
Improvement
Cost(3)
($)
Project
Schedule
Repair cracks and spalls along STF Structures #1 and #2 with high-strength mortar. Monitor and track water penetration occurring on the perimeter of each structure. Repair and rebuild interior surfaces of the effluent boxes exiting from each structure with protective coatings and high-strength mortar.Project Details:Project Element Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5 - 1C
Project Name: STF Pump Station Structure System Type: WastewaterProject Description:
$ 12,000 $ 21,000 $ 27,000 2027
Project Detail:

Percent Cost ($)
100% 27,000 $
0% $ - 100% 27,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total
Project Cost Allocation:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Concrete
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project
Schedule
Repairs cracking on top deck.Inspect interior of pump station for coatings. Flow cannot be shut down to the effluent box - shutdown would send untreated water to disposal ponds. Will need to assess work sequence when this work is scheduled.Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
Project Element ($/ft)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5 - 1D
Project Name: STF Pump Pipe SupportsSystem Type: WastewaterProject Description:
$ 9,000 $ 15,000 $ 20,000 2027
Project Detail:

Percent Cost ($)
100% 20,000 $
0% $ - 100% 20,000 $
Notes on Cost Estimation:Total
Unit Cost(1)
Project Element ($/ft)Reimbursement Category
Existing Users
Future Users
Corrosion has begun to occur. Clean exterior and coat supports with protective coatings.

Project
Schedule
Project Cost Allocation:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Miscallenous
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5 - 1E
Project Name: Secondary Sludge Pumps 1 and 3System Type: WastewaterProject Description:
$ 11,000 $ 19,000 $ 25,000 2030
Project Detail:

Percent Cost ($)
100% 25,000 $
0% $ - 100% 25,000 $
Notes on Cost Estimation:Reimbursement Category
Existing Users
Future Users
Total25k provided by City
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Project Element
Notes:

Clean exterior and monitor the corrosion. 2 pumps. Project completed in 2024/2025. Removed from O&M budget.Project Details:

Capacity (MG)
Replace/
New
Capacity
(MG)
Unit Cost(1)
($/gallon)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Replacement
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 5 - 1F
Project Name: Secondary Sludge Pumps 2System Type: WastewaterProject Description:
$ 9,000 $ 15,000 $ 20,000
Percent Cost ($)
100% 20,000 $
0% $ - 100% 20,000 $
Notes on Cost Estimation:Total25k provided by City
(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
Future Users
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).

Replace secondary sluge pump #2. Project completed in 2024/2025. Removed from O&M budget.Project Details:

Project Element Capacity (MG)
Replace/
New
Capacity
(MG)
Unit Cost(1)
($/gallon)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Replacement
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 6 - 1A
Project Name: Secondary Clarifier #1 StructureSystem Type: WastewaterProject Description:
$ 10,000 $ 17,000 $ 22,000 2027
Project Detail:

Percent Cost ($)
100% 22,000 $
0% $ - 100% 22,000 $
Notes on Cost Estimation:Total
Unit
Cost(1)
Project Element ($/ft)Reimbursement Category
Existing Users
Future Users
Repair cracks and spalls along Secondary Clarifier Structures #1 and #2 with high-strength mortar. Install kickplates on the access guardrail Project
Schedule
Project Cost Allocation:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
miscallenous
Notes:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 6 - 1B
Project Name: Secondary Clarifier #2 StructureSystem Type: WastewaterProject Description:
$ 10,000 $ 17,000 $ 22,000 2028
Project Detail:

Percent Cost ($)
100% 22,000 $
0% $ - 100% 22,000 $
Notes on Cost Estimation: Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Repair cracks and spalls along STF Structures #1 and #2 with high-strength mortar. Install kickplates on the access guardrailProject Details:Project Element Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit
Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
concrete repairs
Notes:

Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 6 - 1C
Project Name: Mechanical Pumps and DrivesSystem Type: WastewaterProject Description:
$ 45,000 $ 77,000 $ 100,000 2028
Project Detail:

Percent Cost ($)
100% 100,000 $
0% $ - 100% 100,000 $
Notes on Cost Estimation:

Notes:

Clean exterior and monitor/replace coatings. Annual maintenance required. Rehab of pumps required in next few years.

Miscallenous
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Project Element Schedule
Project Details:

Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Future UsersTotal
(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Existing Users
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 7-1A
Project Name: Digester #1 and 3 StructuresSystem Type: WastewaterProject Description:
$ 255,000 $ 438,000 $ 569,000 2027
Project Detail:

Percent Cost ($)
100% 569,000 $
0% $ - 100% 569,000 $
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Repair exterior, spalls and cracks with high-strength mortar. Inspect the interior of Digester #1 and #3 during an offline period. Apply protective coatings to the interior. Monitor for leaks when in service.

Includes gas valve, sludge valving, feed piping and gas handling maintenance.

Project requires repair of Digester 3 first to allow for Digester 1 repair, and Digester 3 operation. Then, once Digester 1 is maintained, Digester 3 will ramp down and be demolished in Phase 1. Limit expenditure on Digester #3. Digester 1 to be converted a sludge holding tank as part of Phase 1. Project Details:Project Element Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Demolition
Notes:

Existing Users
Future UsersTotalDigester #1 is in worse condition and thus it is assumed 20% of the surface will need coating (2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 7-1B
Project Name: Sludge Thickener #1 Structure and CatwalkSystem Type: WastewaterProject Description:
$ 35,000 $ 60,000 $ 78,000 2029
Project Detail:

Percent Cost ($)
100% 78,000 $
0% $ - 100% 78,000 $
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Clean exterior, replace corroded bolts or anchors, and monitor corrosion. Repair exterior, spalls and cracks with high-strength mortar. Replace 6 valves in sludge thickener Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Notes:

Existing Users
Future UsersTotalcost includes coating and some potential valve replacement (2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 7-1C
Project Name: Sludge Thickener #2 Structure and CatwalkSystem Type: WastewaterProject Description:
$ 35,000 $ 60,000 $ 78,000 2029
Project Detail:

Percent Cost ($)
100% 78,000 $
0% $ - 100% 78,000 $
Notes on Cost Estimation:

Notes:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Clean exterior, replace corroded bolts or anchors, and monitor corrosion.

Repair exterior, spalls and cracks with high-strength mortar.Project Details:Project Element Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Existing Users
Future Users
Totalcost includes coating and some potential valve replacement (1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 7-1D
Project Name: Digester Control BuildingSystem Type: WastewaterProject Description:
$ 5,000 $ 9,000 $ 11,000 2028
Project Detail:

Percent Cost ($)
100% 11,000 $
0% $ - 100% 11,000 $
Notes on Cost Estimation:

Notes:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Replace anchors, bolts and other components with stainless steel.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Existing Users
Future Users
Total
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 8-1A
Project Name: Storage Building StructureSystem Type: WastewaterProject Description:
$ 201,500 $ 346,000 $ 450,000 2026
Project Detail:

Percent Cost ($)
100% 450,000 $
0% $ - 100% 450,000 $
Notes on Cost Estimation:

Notes:

Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Full roof replacement required.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Existing Users
Future Users
Total
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost). (3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 8-1B
Project Name: Maintenance Shop StructureSystem Type: WastewaterProject Description:
$ 14,000 $ 24,000 $ 31,000 2029
Project Detail:

Percent Cost ($)
100% 31,000 $
0% $ - 100% 31,000 $
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Southern half of the roof has no roof drain. Add roof drain and replace corroded scuppers. Repair mid-span of the lintel above the roll-up door.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Notes:

Existing Users
Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 8-1C
Project Name: Maintenance Shop StructureSystem Type: WastewaterProject Description:
$ 39,000 $ 67,000 $ 87,000 2029
Project Detail:

Percent Cost ($)
100% 87,000 $
0% $ - 100% 87,000 $
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Replace corroded pipe supports of metal structure over the boiler. Provide structural bracing on the exhaust stack.

Project Details:Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Notes:

Existing Users
Future UsersTotalsystem is 30 x 60 ft - 180 ft of perimeter, with pipe supports and 4 columns to have corrosion repair. pipe support replacement estimated at 175$ per ft (direct cost, labor and materials only). 15ft tall column repair estimated at 125$/ft (4 columns) (2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category
Santa Maria Master Plan Condition Assessment | CITY OF SANTA MARIA Project Number: Area 8-1D
Project Name: Facility Drainage Sump PumpsSystem Type: WastewaterProject Description:
$ 4,000 $ 7,000 $ 9,000 2027
Project Detail:

Percent Cost ($)
100% $ 9,000
0% $ - 100% $ 9,000
Notes on Cost Estimation:
(1) Los Angeles ENR Construction Cost Index for February 2024 is 15,214 Clean exterior, replace corroded bolts or anchors, and monitor corrosion. Project Details:

Project Element
Proposed
Diameter
(in)
Replace/
New
Length
(ft)
Unit Cost(1)
($/ft)
Baseline
Construction
Cost
($)
Estimated
Construction
Cost(2)
($)
Capital
Improvement
Cost(3)
($)
Project
Schedule
Concrete
Notes:

Existing Users
Future UsersTotal
(2) Estimated Construction Cost includes a 30% contingency, 10% for general conditions, 15% for general contractor, and 8.75% sales tax applied to materials only (assumed 50% of the baseline cost).(3) Total project cost includes a 30% markup of the estimated construction cost that accounts for engineering, management, and legal fees.

Project Cost Allocation:

Reimbursement Category

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 5: Wastewater Collection System
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 5: Wastewater Collection System
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:14:30-07'00'
VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 5/Ch01.docx Contents
CHAPTER 1 WASTEWATER COLLECTION SYSTEM

1.1 Overview 1-1

1.2 Sewer Collection System Overview 1-1

1.3 Septage Receiving Station 1-6

1.4 Sewer System Management Plan 1-10

1.5 Other Collection System Resources 1-11
Appendices

APPENDIX A SEWER SYSTEM MANAGEMENT PLAN

APPENDIX B URBAN WATER MANAGEMENT PLAN

APPENDIX C SANTA MARIA GENERAL PLAN - ALTERNATIVES TECHNICAL MEMORANDUM APPENDIX D 2012 UTILITIES CAPACITY STUDY
Tables
Table 1.1 SSMP Sections 1-10
Figures
Figure 1.1 City Wastewater Collection System 1-2
Figure 1.2 Major Pipework in the Vicinity of the WWTP Headworks 1-4 Figure 1.3 Northwest and Southwest Sewer Hydraulic Profiles 1-5 Figure 1.4 Junction Boxes A' and A Hydraulic Profile 1-7 Figure 1.5 Junction Box B Hydraulic Profile 1-8
Figure 1.6 Improvements Made to the Septage Receiving Area in 2019 1-9 VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
SANTA MARIA WWTP PROGRAM MANAGEMENT SERVICES ii
Abbreviations
City City of Santa Maria
CIP Capital Improvement Plan
FOG fats, oils, and grease
GIS geographical information system
NW northwest
SSMP Sewer System Management Plan
WWTP wastewater treatment plant
VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 WASTEWATER COLLECTION SYSTEM

1.1 Overview
The purpose of this chapter is to present summary information regarding the existing wastewater collection system for the City of Santa Maria (City). The reader can then research the appropriate resources to obtain more detailed information needed. Several resources developed by the City relating to the collection system were used to obtain the information presented in this chapter.

Some of those resources include:
 Sewer System Management Plan (2023).
 Santa Maria General Plan (2020).
 Utilities Capacity Study (2012).
 Urban Water Management Plan (2020).

The wastewater collection system in Santa Maria is under the jurisdiction of the City’s Department of Utilities, Water Resources Division.

Other references that were drawn upon that are currently still in development are:
 2025 update to the Urban Water Management Plan.
 Modeling updates to the 2012 Utilities Capacity Study.

This chapter also includes a short description of the septage receiving station located near the terminal end of the collection system, just upstream of the wastewater treatment plant (WWTP) headworks. A more detailed discussion of Septage Receiving can be found in Volume 13, Chapter 5.

1.2 Sewer Collection System Overview
The City owns and operates approximately 250 miles of sewer pipeline and one sewer lift station. There are three major trunk lines accounting for roughly 22 miles out of the total, which include 12-inch, 14-inch, 24-inch, 27-inch, and 30-inch diameter segments. The majority of the system is 8-inch diameter or smaller, with 12- to 15-inch collection lines that feed the trunk sewers. The single sewer lift station is located near the Santa Maria Country Club and consists of duty and standby 2 horsepower (hp) pumps that lift a very small quantity of flow. The rest of the sewer system conveys flow by gravity to the wastewater treatment plant. The existing sewer system with associated pipeline sizes and the lift station are illustrated in Figure 1.1.

VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
Source: City of Santa Maria Department of Utilities.

Figure 1.1 City Wastewater Collection System
VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
The major trunk lines from the north and central areas of the City combine as shown in purple in Figure 1.1, and the two remaining trunk lines, the 30-inch Southwest Trunk main and the 30-inch Dejoy Trunk Main, combine in a junction box (Junction Box A') about 600 feet upstream of the headworks. In 2019, the City undertook a project to make improvements to the influent sewer pipes and the septage receiving station (see Figure 1.2). From Junction Box A', two parallel 42-inch pipes convey the influent flow through the septage receiving area, downstream of which they increase in size to two 48-inch diameter pipes at Junction Box A. These discharge independently into Junction Box B immediately upstream of the headworks. Two parallel 30-inch diameter pipes connect Junction Box B to the headworks. Figure 1.2 shows a layout of the influent sewers in the vicinity of the headworks.

The hydraulic profiles of the Southwest and DeJoy (Northwest [NW]) Trunk sewers, taken from a preliminary hydraulic model, are shown in Figure 1.3. The City is currently undertaking a study to update the hydraulic model of the collection system and conduct a sewer capacity analysis. The model is still in a preliminary phase and requires further calibration and verification. For example, the invert elevations shown at stations 17,000 through 19,000 do not appear to match the actual invert elevations at Junction Boxes A', A, and B.

The profiles shown in Figure 1.3 are based on current average daily flows (ADF). The vertical lines in the profiles represent existing manholes. It is understood that these profiles will be updated as part of the ongoing hydraulic model update.

For the NW trunk profile (top image in Figure 1.3), a 27-inch sewer line combines with the 30-inch trunk at Station 13,800. In addition, Station 16,700 of the NW trunk indicates the location of Junction Box A', whereas Station 18,000 indicates the location of Junction Box B.

VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Source:Taken from 2019 Influent Piping Improvements Project.

Figure 1.2 Major Pipework in the Vicinity of the WWTP Headworks VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Figure 1.3 Northwest and Southwest Sewer Hydraulic Profiles VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
The locations and invert elevations of Junction Box A' and A, along with the hydraulic profile of the 42-inch and 48-inch pipes, are illustrated in Figure 1.4, which is taken from the 2019 Influent Piping Improvements project. Note that Figure 1.4 only shows one of the two parallel lines. As can be seen, the 42-inch pipe expands into a 48-inch pipe at Junction Box A. The City typically operates with only one of the 48-inch lines in service downstream of Junction Box A. The septage receiving station indicated in this figure is described in more detail later in this chapter.

The location and invert elevation of Junction Box B, along with the hydraulic profile of the two 48-inch influent pipes, are illustrated in Figure 1.5. As noted earlier, there are parallel 30-inch pipes that connect Junction Box B to the headworks.

During the preliminary design phase of the Phase 1 Expansion Project, the hydraulic profile of the incoming sewers to the headworks will need to be updated and checked.

1.3 Septage Receiving Station
As part of the 2019 improvements to the influent sewer pipes, there were also improvements made to the septage receiving station. Figure 1.6 shows an overview of the improvements that were made. Two existing septage receiving areas were removed, and a new area was added east of the existing grease receiving area. The City currently uses both the grease receiving area and the newer one shown in Figure 1.6 for septage receiving. Following the 2019 improvements, the City added a separate dump area to the north of the labelled grease receiving area that includes a 1-1/4-inch screen. Septage loads containing large amounts of rags typically use the new receiving area, and other septage haulers use the updated area beneath the canopy structure. Septage flow from both areas combines in a new 48-inch manhole, which transfers flow to a new 60-inch diversion manhole that can feed flow to either of the incoming 42-inch sewers.

As part of the upcoming Phase 1 Expansion Project, modifications to the septage receiving station may be required to better control the flow of high-strength septage into the WWTP. The City has conducted some septage sampling exercises to gather additional information on the quality and quantity of septage that some of the major haulers are dumping at the treatment plant. The results of the sampling exercises are presented in detail in Volume 13, Chapter 5.

Also included in Volume 13, Chapter 5, are proposed improvements to the septage receiving station.

VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Figure 1.4 Junction Boxes A' and A Hydraulic Profile
VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.5 Junction Box B Hydraulic Profile
VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
Figure 1.6 Improvements Made to the Septage Receiving Area in 2019 VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10

1.4 Sewer System Management Plan
The existing Sewer System Management Plan (SSMP) provides construction specifications, legal obligations, performance and design standards, reporting procedures, and emergency response plans for the existing collection system. The plan summarizes important contact information and agencies responsible for the sewer system. This includes phone numbers and names of both City individuals and of regulatory agencies. A copy of the 2023 SSMP is included in Appendix A.

The plan is categorized into the following sections, described in Table 1.1.

Table 1.1 SSMP Sections
SSMP Section Description
Section 1 - Goals  Sets five overarching goals for the sewer system that aim to ensure effective and safe operation, provide adequate capacity, minimize sewer system spills, and ensure regulatory compliance.

Section 2 - Organization  Provides contact information of responsible parties, including Director of Utilities, managers, supervisors, and regulatory agencies.
 Provides the organizational hierarchy for the operation and management of the sewer system.
 Sets the chain of communication during spills and emergency situations.

Section 3 - Legal Authority  Sets the existing jurisdiction and authority of the City to manage the sewer system, including preventing illicit discharges, requiring proper design and construction of sewers, enforcing violations, and ensuring access to public sewer systems.  Provides existing legal agreements with Laguna County Sanitation District for accepting and treatment of sewer flows in certain areas of each other's service areas that can be more easily served by the adjacent agency.
 Provides the City specifications for sanitary sewers, including construction methods, materials, and operations.

Section 4 - Operations and
Maintenance Program
 Summarizes the existing operation and maintenance programs for the City, including a Collection System Map, details for its rehabilitation and replacement plan, contingency equipment inventory, and staff training.

Section 5 - Design and
Performance Standards
 Sets standards for installation, rehabilitation, and repair using City standard drawings and specifications.
 Sets standards for inspection and testing of new, rehabilitated, and repaired facilities.

Section 6 - Spill Emergency
Response Plan
 Summarizes the Emergency Response Plan and includes process for reporting sanitary sewer spills to the City, dispatching City staff to respond, training City staff, proper notification procedures, reporting requirements, protection of Waters of the State and water quality monitoring.

Section 7 - Fats, Oils, and
Grease Control Program
 Summarizes the FOG program for the City, including an implementation plan and schedules for programs, legal authority to implement FOG program, and identification of sections of the sewer system prone to FOG accumulation and scheduled for targeted frequent maintenance.
 Provides public education and outreach materials for the FOG program.

Section 8 - System
Evaluation and Capacity
Assurance Plan
 Describes the City's CIP to ensure adequate sewer system capacity by evaluating system performance, setting design standards, and implementing capacity enhancement measures based on known deficiencies.

VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
SSMP Section Description
Section 9 - Monitoring,
Measurement, and Program
Modifications
 Evaluation of the effectiveness of the SSMP is done by maintaining and compiling reports of various program activities, reviewing reports and activities, assessing system performance, and updating activities as needed to meet SSMP goals.

Section 10 - SSMP Program
Audits
 States the regulatory requirements for the sewer system audits.  Summarizes the guidelines of the Sewer System Audits, including training, targets and objectives, data management, and documented procedures.  Assesses SSMP goals and reports outcomes and, if needed, changes to the program to meet goals.

Section 11 - Communication
Program
 Summarizes all the potential stakeholders for the sewer system, and their involvement/input with the management of the sewer system.

Notes:

CIP - Capital Improvement Plan; FOG - fats, oils, and grease As part of Section 4 of the SSMP, the City maintains the existing sewer system and an online atlas through a geographical information system (GIS). The GIS includes critical information relating to pipeline sizes, materials, elevations, and depths of each sewer trunk.

The City also employs a cleaning and monitoring closed-circuit television program as part of its Operations and Maintenance Program.

1.5 Other Collection System Resources
Additional information about the collection system can be obtained from the following resources in the appendices:
 Santa Maria General Plan (2020) – see Appendix C.
 Utilities Capacity Study (2012) – see Appendix D. The Capacity study highlighted multiple segments of pipeline that failed recommended peak flow capacity analyses. Recommended capital projects to increase sewer collection system capacities were recommended. A utilities capacity update is currently in development.

The 2012 Utilities Capacity Study highlights:
 Existing water demands and capacities of the water distribution system.  Projected water demands, populations, sewage flows, and storage requirements.  Recommended capital improvements to sewer systems and water distribution systems.  Monitoring recommendations.

VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A SEWER SYSTEM MANAGEMENT PLAN

CITY OF SANTA MARIA

SEWER SYSTEM MANAGEMENT
PLAN
Prepared by:

CITY OF SANTA MARIA

UTILITIES DEPARTMENT
July 2009
April 2014 - 1st Revision
September 2020 – 2
nd Revision
May 2023 - 3rd Revision
City of Santa Maria
Sewer System Management Plan
Section I - Goals
The City of Santa Maria (“City” or “Santa Maria”) owns and operates the City's wastewater collection and treatment system and purposely pursues proper management, operation, and maintenance of all system elements in order to reduce and prevent sewer system spills. If overflows occur, the City's efforts go to mitigating the negative impacts to human health and the environment.

The City holds to a high standard in the day-to-day operation and maintenance of its valuable infrastructure assets through proper operation and maintenance of the system.

The City intends to honor the goals of this Plan, report overflows when they occur, and to respond effectively to the needs of its citizens.

The goals of the City’s Sewer System Management Plan are:

A. To properly manage, operate, and maintain all portions of the City's wastewater collection and treatment system.

B. To provide adequate capacity to convey the City's peak wastewater flows.

C. To minimize the frequency of sewer system spills.

D. To mitigate the impacts that are associated with any sewer spills that may occur.

E. To meet all applicable regulatory notification and reporting requirements.

City of Santa Maria
Sewer System Management Plan
This page intentionally left blank.

City of Santa Maria
Sewer System Management Plan
Section II - Organization
The Legally Responsible Official for the City's sanitary sewer collection system and wastewater treatment plant is the Director of Utilities.1 Through delegation of authority, the Wastewater Supervisor is also approved as Legally Responsible Official with the authority to enter and certify data into the online sanitary sewer overflow database on behalf of the City.

The following Sub-Sections describe:

A. The name of the responsible or authorized representative.

B. The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program, and lines of authority through an organizational chart with narrative explanation; and
C. The chain of communication for reporting sanitary sewer spills, from receipt of a complaint or other information including the person responsible for reporting spills to the State Office of Emergency Services ( Cal OES) and any other agencies if applicable (i.e., State and Regional Water Boards).
1 Individuals are identified by titles only in Sub-Sections II(a) and II(b). Names and personal phone numbers follow in Sub-Section II(c) for ease of revision.

City of Santa Maria
Sewer System Management Plan
Department of Utilities Sewer System
Management Plan Organization Chart
Legally Responsible Official
Director of Utilities
Water Resources Division
Water Resources Manager
Wastewater Supervisor
Alternate Legally
Responsible Official
(Issues work orders,
supervise activities of
others, submits data to
CIWQS)
First Responders
(Writes in-field incident reports,
takes pictures, provides clean-up,
mitigates spill damage, etc.)
Water Resources Lead Operators
(2)
Water Resources Operators
Wastewater Operators
Wastewater Operator Trainees
Regulatory Compliance Division
Regulatory Compliance Manager
Provides Specialized Follow-up
Activities
(Back-up to submit data to
CIWQS, provide notifications,
inspect, take samples, etc., as
necessary)
Laboratory Coordinator
Regulatory Compliance
Specialists
Regulatory Compliance Clerk
Sub-Section II(a) - Lines of Authority
City of Santa Maria
Sewer System Management Plan
The Director of Utilities is the primary Legally Responsible Official for the Sewer System Management Plan. By delegation of authority, the Wastewater Supervisor is the alternate Legally Responsible Official. Any of these individuals are authorized to certify the information entered into the State's online reporting system, California Integrated Water Quality System “CIWQS”.

The Water Resources Division as a whole, under the authority of the Water Resources Manager, is the first responder to a sewer incident or spill. Work Orders are prepared by the Wastewater Supervisor (“Supervisor”) or Water Resources Lead Operator (“Lead”), and the Supervisor or Lead delegates and directs the individuals and/or crews that will respond to the call, provide mitigation, and damage control, clean up as needed, and interact with any citizen who may be responsible for the incident or affected by it. The on-call crew will prepare an in-field incident report, including photos, and submit all documentation to their supervisor.

The Wastewater Supervisor or Water Resources Lead Operator will review the documentation received from the sewer response crew and enter the data into CIWQS.

Any necessary follow-up sampling and inspections will be performed and/or coordinated with Utilities Department Water Resources Regulatory Compliance staff.

City of Santa Maria
Sewer System Management Plan
Sub-Section II(b) – Chain of Communication
Vactor truck sucks up spill and crew
washes area. Crew determines spill
category (e.g., 1, 2, 3, or 4). NOTE: If
Category 1 occurs after hours or on
weekends, crew will immediately contact
the Water Resources Manager or
Wastewater Supervisor.

City of Santa Maria
Sewer System Management Plan
Sub-Section II(c) - Contact Names and Phone Numbers
Position Names Contact Numbers2
Director of Utilities Shad Springer ext. 7216
(cell) 748-9963
Water Resources Manager Alexandra Griffith ext. 7241
(cell) 332-0017
Principal Civil Engineer Christos Stoyos ext. 7256
(cell) 717-8579
Wastewater Supervisor Russ Newman ext. 1651
(cell) 266-1617 (H) 406-9103
Water Resources Lead Operator Lazaro Rosas
(Junior)
ext. 7414
(cell) 249-0067 (H) 868-7740
Water Resources Lead Operator Humberto Guerrero (cell) 310-1095 (H) 720-8260 Regulatory Compliance Manager Vacant
Laboratory Coordinator Todd Suter ext. 7417
Regulatory Compliance Specialists
Antonio Bravo
Sean Casey
John Maxson
ext. 7218 (cell) 264-9300
ext. 7246 (cell) 249-0060
ext. 7260 (cell) 602-2699
Water Resources Operators/ Wastewater
Operators/Wastewater Operator Trainees
NOTE: Only use home or personal cell phone
numbers for these individuals if no contact is made
through the on-call cell phone number: 264-9175
David Gonzalez
Issac Nogalez
Matthew Norling
Saul Ramirez
Steve Soto
Jesse Teniente
Richard Villegas
(cell) 621-2284
(cell) 249-0018
(cell) 345-5122
(cell) 868-5087
(cell) 878-6441
(cell) 478-2495
(cell) 598-0758
Vactor Truck (on-call business hours) 310-1155
(on-call after hours) 249-0102
Agency Phone Number
California Office of Emergency Services (800) 852-7550
Regional Water Quality Control Board 549-3147
Santa Barbara County Flood Control 681-5636 or 680-7356 Santa Barbara County Environmental Health 346-8460
The City shall notify the California Office of Emergency Services (Cal OES) within two hours of spills greater than 1,000 gallons that reach a drainage channel of a surface water. Category 1 and 2 draft reports to be submitted within three business days of learning of the spill and certified within 15 business calendar days of the spill end date and time. A technical report needs to be submitted within 45 calendar days after the end date of any Category 1 spill greater than 50,000 gallons, and all other reports are due within 30 calendar days after the end of the month, per General Order WQ 2022-0103-DWQ, attached as Appendix A.

Unless otherwise indicated, the area code for all phone numbers is 805. 2 All extensions correspond with the City's main line phone number: (805) 925-0951 City of Santa Maria
Sewer System Management Plan
This page intentionally left blank.

City of Santa Maria
Sewer System Management Plan
Section III - Legal Authority
Santa Maria is a California charter city and municipal corporation organized and operating under the laws of the State of California. As such, the City has the authority under the California Constitution and applicable general laws to make and enforce within its limits all local police, sanitary and other ordinances and regulations not in conflict with the general laws. In addition, the City has supreme authority under its charter, adopted November 7, 2000, to adopt, make, exercise, and enforce all legislation, laws, and regulations and to take all actions relating to municipal affairs. A copy of the City’s Charter follows as Sub-Section III(a).

The City’s Wastewater Collection, Treatment, and Disposal ordinance is included as Chapter 8-12 of the Santa Maria Municipal Code. The Municipal Code may be accessed online at http://www.qcode.us/codes/santamaria/.

The City has a working relationship with an adjacent system, Laguna County Sanitation District, in which some of the City’s wastewater discharges are treated by Laguna County Sanitation District, and some of the wastewater flows generated within Laguna’s jurisdiction are treated at the City’s Wastewater Treatment Plant. The City has a service agreement with Laguna County Sanitation District, which follows as Sub-Section III(b).

Through its sewer use ordinance, service agreements, and other legally binding procedures, the City has legal authority to carry out the following items:

A. Prevent illicit discharges into the sanitary sewer system, including inflow and infiltration (I & I) from satellite wastewater collections systems and laterals, storm water, unauthorized debris, etc.

The City’s ordinance includes prohibitions on discharge of storm water, swimming pool water, groundwater, rainwater, street drainage, roof drainage, subsurface drainage, unpolluted water, or yard drainage (Santa Maria Municipal Code Section 8-12.403). In addition, Santa Maria Municipal Code Section 8-12.402 includes prohibitions on discharges of solid or viscous pollutants in amounts that will cause obstruction to the flow in the publicly operated treatment works resulting in interference within the meaning of 40 CFR 403.6(d). Section 8-12 Article 14 includes enforcement actions that may be taken to address illicit discharges.

Section 8-12.1413 allows for termination of service if necessary.

Identification of I & I occurs as part of the operation and maintenance of the collections system. Collections system staff have a goal of videoing 10 miles of sewer line annually in order to identify system deficiencies including I & I.

City of Santa Maria
Sewer System Management Plan
Deficiencies are identified and prioritized, and corrective measures are taken with as needed to maintain system operation.

B. Require proper design and construction of sewers and connections.

Santa Maria Municipal Code Section 8-12, Article 2 outlines the requirements for connecting to the City’s sanitary sewer system. Section 8-12.302 requires that all sewers be constructed in accordance with the Standard Specifications for City of Santa Maria Sewer Pipelines in the City. Section S-82 of the City’s Standard Specifications outlines those requirements and follows as Sub-Section III(c).

C. Ensure access for maintenance, inspection, and repairs to publicly owned portions of laterals.

The authority to access the system for maintenance, inspection, and repairs of the publicly owned sewer system is found in Section 8-12.902 (a) of the Municipal Code and in easements of record. All laterals extending from a structure to the sewer main are privately owned and maintained, per Section 8-12.304 of the Municipal Code.

D. Limit the discharge of FOG and other debris that may cause blockages.

In Section 8-12.402 of the Municipal Code, the City prohibits discharge to a community sewer of any solid or viscous pollutants in amounts which will cause obstruction to the flow in the collections system resulting in interference. Potential major contributors, such as restaurants, are required to install grease traps (or interceptors) pursuant to Section 8-12.413 of the Municipal Code and are placed on an inspection and cleaning schedule. Other potential contributors include residential customers whose discharges can cause significant issues.

The City has the option to use a contract inspector or City Regulatory Compliance staff to perform restaurant inspections to verify restaurants are abiding by the City’s ordinance.

E. Enforce violations of its sewer ordinance.

Section 8-12 Article 14 includes provisions for enforcing the ordinance.

Enforcement provisions include declaration of public nuisance, injunction to restrain violation, charges for facilities damaged, correction by the City, civil penalties, permit revocation and termination of service. They are in addition to legal remedies provided elsewhere in the Municipal Code, which include criminal prosecution, administrative fines, and administrative penalties.

City of Santa Maria
Sewer System Management Plan
Sub-Section III(a) - City of Santa Maria Charter
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
Sub-Section III(b) - Laguna County Sanitation District Agreement City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
Sub-Section III(c) - Sanitary Sewer Standard Specifications City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
Section IV - Operations and Maintenance Program
Operations and Maintenance activities are critical to ensuring the long-term health of the sanitary sewer system. The following key areas describe the City’s efforts to operate and maintain its collections system in the most efficient and effective manner:

A. Collection System Map
The City has developed an atlas of its sanitary and storm sewer systems through its Geographical Information System (“GIS”). Conversion of the maps from AutoCAD to GIS was performed in 2007 and 2008. The converted database was turned over to the City in November 2008. The City now accesses the GIS system in the field with tablets. Corrections can be noted in the field and provided to appropriate staff for GIS updates.

The GIS maps include pipeline size, material type, date built, flow direction, elevation, flow line elevation, and depth to pipe. The slope of the line can be calculated from the available data. The length of the pipe can be quickly and accurately calculated using a measuring tool in the map application. Property lines are visible, so that location with reference to the property lines can be determined.

When new subdivisions or changes to the system are completed, data is input by Public Works Department Engineering Division using a protocol developed jointly with the Utilities Department to ensure updating activities do not adversely affect accuracy of the maps.

B. Preventive Operation and Maintenance
The City has experienced sewer blockages and overflows because of root intrusion, broken or offset pipes, pipeline bellies, grease deposition, or other debris in the sewer mains. The City adjusts its preventive maintenance schedule to address some of these issues.

The City owns three Vactor trucks (vacuum trucks) and one video inspection truck equipped with a robotic sewer inspection camera. Trucks and operators can be dispatched for customer service calls and sewer emergency call outs as needed.

The City performs its own cleaning and video operations. The City has approximately 250 miles of pipeline, 22 miles of which is greater than 12 inches in diameter and therefore considered a trunk line. The maintenance target is an average of 120 miles of sewer pipe cleaned and 10 miles of sewer pipe videoed City of Santa Maria
Sewer System Management Plan
per year. Trunk lines are cleaned on a less frequent basis. The goal is to visit each trunk line at least once every 20 years.

System operations and maintenance data are collected in an online database. The online database contains data on sewer cleaning details such as location, dates and times operations were performed, material found in pipes and specific operations and maintenance conditions such as manhole conditions.

C. Rehabilitation and Replacement Plan
System defects are identified through system cleaning and videoing or because of a clog or overflow. Staff review system conditions to determine if the system defect can be corrected through a spot repair of the system or by a larger construction project. Staff contract out for the completion of spot repairs on as needed. An average of $270,000 has been budgeted annually in the sewer maintenance account for sewer line repairs for the last five fiscal years. Larger construction projects are funded through the budget process and turned over to the City’s Department of Public Works Engineering Division for completion.

D. Training
Staff receives hands-on training from more experienced staff in the operation of the City’s vacuum truck and sewer inspection truck. Staff receive confined space training (which includes lock-out/tag-out and competent person training) and CPR training annually; first aid training every three years; and weekly safety tailgate trainings.

E. Contingency Equipment and Replacement Inventories
The City of Santa Maria collections system is comprised of approximately 250 miles of sewer line and one lift station. The City has adequate contingency equipment to address system problems.

The City's lift station has built-in redundancy with two pumps when only one is needed to meet demand flows. The lift station has the capability for emergency generator hookup. In the event a generator is unavailable, a vacuum truck can be used to pump down the influent chamber on a regular basis until electrical power or pump operation is restored.

The City has multiple vacuum trucks so there is adequate response in the event one truck fails. City staff have developed a good working relationship with neighboring Laguna County Sanitation District, and the two agencies have City of Santa Maria
Sewer System Management Plan
provided mutual aid assistance in times of need. The City has trash pumps and hoses to work around system failures. The City keeps basic repair parts at the Wastewater Treatment Plant for use in system failures. Repair parts include manhole lids and rings, multiple 6-inch and 8-inch compression couplers, wyes, and pipe. The City also has an after-hours contact number for a local contractors and underground supply companies to accomplish emergency sewer repairs after business hours.

City of Santa Maria
Sewer System Management Plan
This page intentionally left blank.

City of Santa Maria
Sewer System Management Plan
Section V - Design and Performance Standards
The following key areas describe the City’s efforts to ensure its design and performance standards are current, relevant, and applied:

A. Standards for Installation, Rehabilitation and Repair The City has established standard specifications and drawings for the major components of the sanitary system. These specifications and drawings are reviewed on a regular basis. The City Public Works Department Engineering Division coordinates with Water Resources field staff to ensure information in the specifications and drawings are accurate, and adequate for ensuring proper operation and maintenance of the sanitary sewer system. Engineering Division staff confers with local designers and engineers to receive input and feedback on recommended changes. This process is ongoing.

When needed, the City has opted for pipe replacement over rehabilitation. Therefore, there has yet to be a need to develop a standard for pipeline rehabilitation.

The City’s standard drawings and specifications are located on the City’s website with standard drawings specifically located at https://www.cityofsantamaria.org/city-government/departments/public-works-services/engineering-division/standard-drawings and standard specifications at https://www.cityofsantamaria.org/city-government/departments/public-works-services/engineering-division/standard-specifications-index.

The standard drawings include the following items:
• Manhole and details
• Sand or grease trap
• Sewer cleanout detail
• Drop manhole
• Sewer lateral installation
B. Standards for Inspecting and Testing of New, Rehabilitated, and Repaired Facilities All components of the sewer system are inspected, and tests are reviewed before a system is accepted by the City. Tests include air testing for gravity pipelines and pressure testing of force mains. Additionally, the City requires video inspections of sewer lines and the video must be reviewed by City staff and demonstrate that the sewer system is free from defects and constructed per City Standards prior to accepting. All major development projects are required to have performance bonds, which are not released for one year after acceptance of the project.

This serves as a one-year warranty period to resolve construction defects. The City has three full-time Public Works Inspectors and contracts out for additional inspectors as needed.

Inspection services are charged based on the engineer’s estimate or on the size of the lot being developed.

City of Santa Maria
Sewer System Management Plan
Section VI - Spill Emergency Response Plan
This spill emergency response plan has been developed pursuant to State Water Resources Control Board guidelines requiring all public wastewater collection system agencies in California to be regulated under General Waste Discharge Requirements.

This Spill Emergency Response Plan (ERP) includes:

A. Reporting sanitary sewer spills to the City
For reporting sewer emergencies during regular business hours, the public can call the Utilities Department at 805-925-0951 extension 7270 or 7411. Outside of regular business hours, the City’s 24-hour Dispatch Center is available either by direct line at (805) 928-3781 or through the 911 operator. The Dispatch Center has immediate radio and cell phone access to the field crews during normal working hours and the same access to the Emergency Call-Out list during non-working hours.

B. Dispatch of City Sewer Response Crews to ensure an appropriate response to all spills.

Upon notification from Utilities staff or Dispatch, operators assigned to collections respond to the sewer call. If additional resources are needed, operators are to contact the lead or supervisor for assistance. City policy is to respond to all spills within City limits, both on private and public property, and take all steps to mitigate and prevent the spills from reaching storm drains, flood control channels, and/or beneficial uses of Waters of the State in accordance with waste discharge requirements. When requested, the City will provide mutual aid to outside jurisdictions. "Section II - Organization" of this document details the lines of authority and responsibilities of City staff during an emergency. Since the City provides wastewater collection and treatment services to residents and businesses, the Utilities Department has equipment and manpower dedicated to sewer system maintenance, operation, and emergency response. For any spills that cannot be handled by the City’s Vactor trucks, the Utilities Department would make appropriate requests for assistance to nearby agencies (Laguna County Sanitation District) and outside contractors.

C. Procedures to ensure appropriate staff and contract personnel are aware of and follow the ERP and are appropriately trained.

The role of each person during an emergency is clearly and concisely established. The City has pre-established responsibilities for staff members that work concurrently with the field crews to provide an efficient response. If the emergency is during normal working hours, both field crews and the supervisor work to handle the emergency. City staff is positioned as follows:

1. Management staff maintains areas available for reference and where multiple phone lines can be used to arrange for contractors, pumper trucks, and other independent contractors.

2. Cell phones and/or radios utilized by field staff allows continuous communication and organization from the Water Resources office.

City of Santa Maria
Sewer System Management Plan

3. The Wastewater Supervisor or Lead is in the field documenting the situation and verbally reports back to the Water Resources office. The Supervisor immediately reports any sewer spills to the required agencies verbally and as soon as possible, files any necessary written reports. The Supervisor, while providing direction to field crews, reports continuously to the Water Resources Manager to ensure that the best possible actions are taken.

D. Procedures to address emergency operations, such as traffic, crowd control, and other necessary response activities.

Utilities Department sewer crews respond to all sewer emergencies. Assistance for traffic and crowd control is available from other crews within the Department and with other City Departments, including Public Works Department - Streets Division and the Fire and Police Departments. Requests for assistance are made through the City’s Dispatch Center.

E. Proper notification procedures so that the primary responders and regulatory agencies are informed of all sanitary sewer spills in a timely manner.

Per WQ 2022-0103-DWQ:

Within two hours of becoming aware of any Category 1 spill where 1,000 gallons or greater is discharged to surface water or the spill is in a location where it probably will be discharged to surface water, the California Office of Emergency Services (Cal OES) shall be notified by calling 1-800-852-7550. A California Office of Emergency Services Control Number shall also be obtained.

Category 1 spills that enter the storm drain system and are not fully recovered, staff are directed to call the Water Resources Manager immediately. If not available, then staff is directed to call the California Office of Emergency Services at 1-800-852-7550, within two hours of becoming aware of the spill.

For these same spills, any spill that enters a surface water, or one greater than 1,000 gallons, a draft report shall be submitted within three (3) business days of becoming aware of the spill and certified within 15 calendar days of the spill end date.

F. Procedures to ensure reporting to appropriate regulatory agencies and other potentially affected entities (i.e., health agencies, Regional Board, water suppliers) of all spills that potentially affect public health or reach the waters of the State in accordance with the Emergency Response Plan (“ERP”).

All spills shall be reported in accordance with the ERP, the California Water Code, other State Law, and other applicable WDRs or NPDES permit requirements. This SSMP identifies the officials who will submit and certify reports.

The following reporting requirements will be followed:
• Category 1 Spill: Submit draft report within three business days of becoming aware of the City of Santa Maria
Sewer System Management Plan
spill and certify within 15 calendar days of spill end date. • Category 2 Spill: Submit draft report within 3 business days of becoming aware of the spill and certify within 15 calendar days of the spill end date. • Category 3 Spill: Submit a certified report within 30 calendar days of the end of the month in which spill(s) occurred.
• Category 4 Spill: Submit a certified report within 30 calendar days after the end of the month in which spill(s) occurred. The report shall include the number of Category 4 spills that occurred and the estimated total spill volume exiting the sanitary sewer system. • Technical Report: Submit within 45 calendar days after the end date of any Category 1 Spill in which 50,000 gallons or greater are spilled to surface waters. • “No Spill” Certification: Certify that no spills occurred within 30 calendar days of the end of the month or, if reporting quarterly, the quarter in which no spills occurred. • By April 1 of each year, the previous year’s Annual Report (previously termed Collection System Questionnaire) shall be updated.

City policy is to report public spills as required under the current General Order from the State Water Resources Control Board and the Waste Discharge Requirements for the City’s Wastewater Treatment Plant.

G. A program to ensure all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to Waters of the State, including past, present, and probable future beneficial uses of water and the prevention of nuisance. Additionally, a program to minimize or correct any adverse impact on the environment resulting from the spills including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge.

City sewer crews are trained to use best management practices and other containment devices to block entrances to storm drains. Vactor trucks are utilized to vacuum up spills and to wash down contaminated areas. The City may use the storm drain system as a containment device if needed. The outlet to the storm drain can be blocked and the spill and wash down water are vacuumed from the conveyance system. The impact of spills is minimized by washing the spill down with water to the maximum extent possible. Disinfectants can be utilized also if determined to be appropriate and to not pose additional concerns. If necessary, the City will report spills immediately to the Santa Barbara County Department of Environmental Health for monitoring water quality and posting hazard notices.

H. Water quality monitoring
Water quality monitoring, including water quality sampling of the receiving water, shall be conducted within 18 hours of initial knowledge of a spill of 50,000 gallons or greater to surface waters.

City of Santa Maria
Sewer System Management Plan
This page intentionally left blank.

City of Santa Maria
Sewer System Management Plan
Section VII - Fats, Oils, & Grease Control Program
The City has experienced sanitary sewer spills associated with fats, oils, and grease (“FOG”). In response to these issues, the City has developed a comprehensive FOG source control program to address such issues.

Sources of grease in the City include restaurants and private residences. Grease is identified as an issue during preventative maintenance activities, such as cleaning and sewer line videoing, as well as in response to sanitary sewer clogs and spills.

The following items describe the City’s legal authority to develop and implement a FOG program and the specific elements of the City’s program:

A. An implementation plan and schedule for public education outreach program that promotes proper disposal of FOG.

The City’s FOG program has several elements to address the various sources and communication methods necessary to address the issue. The first element is a general public outreach program that includes promotional materials, public service announcements, and a general multi-media campaign. The second element is targeted grease outreach that focuses on neighborhoods that have specific grease issues. The third element is a restaurant FOG inspection program.

Each element is described in further detail below:

1. Public Outreach Program – The City budgets funds each year to purchase relevant promotional items (e.g. magnets, grease scrapers, pot holders, grease trappers, and aprons) to educate the public about FOG. Promotional items are distributed by City staff at community events such as Family Day in the Park, Las Fiestas Patrias, the Home and Garden Expo, Autumn Arts Grapes and Grains Festival, Kid’s Day in the Park, and the Chamber of Commerce Trade Show.

In addition, the Utilities Department has an ongoing multi-media campaign to educate the public about proper FOG disposal. Over $25,000 has been budgeted annually for utility billing inserts, billboards, and digital, newspaper, radio, and television advertisements. At minimum, this amount will be budgeted in future years to continue the public FOG outreach. The outreach program will be evaluated annually, and adjustments will be made in response to the effectiveness and costs of these communications methods.

The Utilities Department maintains an outreach program that documents promotional items and advertisements purchased each year.

City of Santa Maria
Sewer System Management Plan

2. Targeted Grease Campaign – The City developed a flyer (attached) that contains information in English and Spanish on the proper disposal of FOG.

When a sizable grease deposit is discovered during inspection or cleaning, or because of a blockage or spill, staff identifies the upstream contributors to the grease deposit. Residences receive the FOG flyer shortly after the grease deposit is detected. Notified residences are documented so the effectiveness of notifications can be evaluated over time.

3. Restaurant FOG Inspection Program – The City has a restaurant FOG inspection program. New restaurants are inspected twice the first year of operation. Once each restaurant has been inspected, it will be placed on an annual inspection schedule. Several business-specific outreach materials have been developed in conjunction with the FOG inspection program at restaurants (attached).

B. A plan and schedule for the disposal of FOG generated within the sanitary sewer system service area.

A septage receiving station is located at the City’s Wastewater Treatment Plant.

The City allows permitted grease haulers to temporarily store used grease in privately owned grease tanks located adjacent to the septage receiving station.

The stored grease will separate over time and the City allows the decanted water from the grease tanks to be discharged to the WWTP. The grease haulers are charged for the grease discharged into their tanks. Periodically, the grease haulers remove the grease and haul it to other treatment facilities equipped to handle grease disposal.

C. The legal authority to prohibit discharges to the system and identify measures to prevent SSOs and blockages caused by FOG.

Section 8-12.402(a)(3) of the Santa Maria Municipal Code prohibits the discharge of solid or viscous pollutants in amounts which will cause obstruction to the flow in the sewer system resulting in interference. Section 8-12.402(b)(2) prohibits the discharge of materials which cause or are capable of causing obstruction of flow in a community sewer system. Section 8-12.409(b) and (c) prohibits the discharge of wastewater containing more than 100 mg/L of oil or grease of animal, vegetable, mineral, or petroleum origin.

D. Requirements to install grease removal devices such as traps or interceptors design standards for the removal devices, maintenance requirements, BMP requirements, record keeping, and reporting requirements.

City of Santa Maria
Sewer System Management Plan
Section 8-12.413(a) of the Santa Maria Municipal Code requires grease, oil, and/or sand traps when, in the opinion of the Director of Utilities, they are necessary for the protection of the wastewater collection and treatment system from liquid wastes containing grease in excessive amounts. Traps are required on discharges from all food service establishments, such as restaurants, convalescent care facilities, hospitals, lodges, and event centers. Regulatory Compliance staff continually review building plans for all commercial facilities to enforce the City’s Municipal Code and have approval authority over the implementation of proper pretreatment installations. Certificate of Occupancy inspections of facilities with pretreatment devices such as grease traps or interceptors are performed to ensure that the required devices were installed properly and to provide notification when a new facility becomes active to be placed on the FOG inspection schedule.

E. Authority to inspect grease-producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the FOG ordinance.

Class III Users are defined in the Santa Maria Municipal Code Section 8-

12.104(16) as all industrial dischargers except those where it is determined by the Director of Utilities that the user discharges primarily sanitary sewage or is classified as a Class IV User (a Significant Industrial User). Class III users include restaurants, automotive repair facilities, and other facilities that may be required to install grease-removing devices. Section 8-12.701 of the Santa Maria Municipal Code requires all Class III users proposing to connect or discharge to the sewer system to obtain a wastewater discharge permit before doing so. Section 8-

12.901(a) and (c) requires Class III users, at the discretion of the Director of Utilities to install and maintain monitoring facilities to allow inspection, sampling, and/or measurements of the building sewer or plumbing systems and to make accommodations allowing access for City personnel.

Section 8-12.902(a) allows the City to inspect the facilities of any user to ascertain whether the requirements of the pertinent sections of the code are being met.

Persons or occupants of premises where wastewater is created or discharged shall allow the City or its representative ready access at all reasonable times to all parts of the premises for the purposes of inspection, sampling, records examination, copying, or in the performance of any of their duties.

F. An identification of sanitary sewer sections subject to FOG blockages and establishment of a cleaning schedule for each section.

G. The City has identified sections of the collection system that are particularly prone to blockages due to grease. These areas are primarily residential neighborhoods.

City of Santa Maria
Sewer System Management Plan
These locations are listed on a schedule for cleaning multiple times a year, as opposed to the annual cleaning for other sections of the sewer system.

The City has also installed over 30 manhole monitors in the sewer collection system in problem areas. The manhole monitors track manhole surcharges and spills and send real-time alarm notifications to City personnel. These early notification alerts allow operators to respond before a condition arises where a spill could occur.

H. Development and implementation of source control measures for all sources of FOG discharged to the sanitary sewer system for each section identified in (f) above.

Section "A" above lists the programs developed by the City to educate the public and businesses on methods for proper disposal of FOG.

City of Santa Maria
Sewer System Management Plan
Door Flyer/Brochure
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
SNIPE FOG Envelope
City of Santa Maria
Sewer System Management Plan
FOG Billboard
City of Santa Maria
Sewer System Management Plan
FOG Brochure for Food Service Establishments
City of Santa Maria
Sewer System Management Plan
City of Santa Maria
Sewer System Management Plan
This page intentionally left blank.

City of Santa Maria
Sewer System Management Plan
Section VIII - System Evaluation and Capacity Assurance Plan The City has implemented a capital improvement plan that ensures sewer adequate capacity. The following key points highlight the City’s efforts to ensure its capital improvement plan is sufficient to meet current and anticipated future needs:

A. Evaluation
The City has not experienced any recent sanitary sewer spills related to hydraulic deficiencies or wet weather flows. This is in large part due to capital improvements the City made to its sewer system in response to recommendations derived from the Utilities Capacity Study (“UCS”). The latest update was completed in February 2015. The most recent Utilities Capacity Study update identified several locations in which the sanitary sewer trunk lines required upgrades to meet current and future expected flows. Many of those locations have been addressed. For others, actual trunk line flow data is being collected using portable flow meters or Smart Covers to collaborate with the model data to verify current conditions to determine whether an upgrade is needed before undertaking a potentially unnecessary capital project.

B. Design Criteria
The most recent UCS updates used modeling software to model all City trunk lines 10 inches and greater in diameter and also installed flow monitors in various locations throughout the City to obtain data on actual existing baseline and peak sewer flows. Flow monitoring data combined with theoretical methods were utilized to determine an appropriate peaking factor.

The model was run to show current conditions and 5-year, 10-year, and build-out projections. Areas showing pipeline capacity deficiencies at the various stages of growth were highlighted and identified to be incorporated into the City’s Capital Improvement Program.

C. Capacity Enhancement Measures
Trunk line upgrades are completed on an ongoing basis. Upgrades specifically associated with growth are typically addressed by developers as new developments are built. If the land use for the development is different from that identified in the UCS, then a sewer study may need to be performed to identify how the change in land use will impact the sewer system. All growth-induced trunk line upgrades are incorporated into the City’s Growth Mitigation Program so that sufficient funds are collected from developers to fund the upgrades.

City of Santa Maria
Sewer System Management Plan
D. Schedule
Capital projects identified in the most recent UCS are prioritized based first on current deficiency, next on 0-5 year deficiency, then 5-10 year deficiency and finally, build-out deficiency. Priorities may change as development occurs and existing conditions are verified.

City of Santa Maria
Sewer System Management Plan
Section IX - Monitoring, Measurement, and Program Modifications The City has a mechanism for verifying that the Sewer System Management Plan goals are being met, and that these goals are adequate for meeting the intent of the program, which is to minimize sanitary sewer overflows.

A. Maintain relevant information to be used to establish and prioritize SSMP activities.

The City uses a GIS database program to track collection system maintenance activities. The City tracks sanitary sewer blockages and spills – including their causes, work orders, sewer line cleaning, and videoing. A monthly report is produced and filed with a monthly summary report of sewer activities.

FOG facility inspections are tracked in the City’s Pretreatment software, LINKO.

B. Monitor the implementation and measure the effectiveness of each element of the SSMP.

Monthly summaries of collections system activities are developed by collections system lead personnel. The summary contains the total length of sewer line flushed and videoed, the number and location of repairs made, the number of customer calls, and the number of spills. Monthly flushing, videoing, and repair goals are checked at the end of each month. Subsequent months’ workloads are adjusted to ensure that the yearly goals are met. Monthly summaries are also checked to see if maintenance activities are effective at reducing system spills.

Collections staff are clear on the City's maintenance and repair goals. They know the goal is to have fewer spills overall and are aware of the tools available to assist them in meeting that goal.

C. Assess the success of the preventive maintenance program.

The Water Resources Manager, or designee, is tasked with observing trends and verifying that preventive maintenance measures are implemented, goals are met, and overall aim of the program is achieved.

D. Update program elements based on monitoring or performance evaluations The Water Resources Division is committed to meeting the overall goals of the Sewer System Management Plan. Current data evaluation indicates that the preventive maintenance goals established to date will be effective at meeting the overall program goals. If current trends continue, there will be no need to adjust City of Santa Maria
Sewer System Management Plan
the maintenance goals. If the data indicates that certain elements of the program are not effective, staff will adjust the program to ensure overall goals are met.

E. Identify and illustrate spill trends including frequency, location, and volume.

Spill information is reviewed on an ongoing basis. The data includes the address, date, type, cause, location, pipe designation (e.g., main line or lateral), and whether responsibility falls on the City or private property owner. This information is used to watch trends, determine problem areas, and evaluate the effectiveness of preventive maintenance and other measures for reducing overflows.

City of Santa Maria
Sewer System Management Plan
Section X - SSMP Program Audits
The City conducts periodic internal audits. As required per General Order WQ 2022-0103- DWQ, audits are performed once every three years, and the audit report shall be prepared and maintained on the City’s shared drive in the same location as the sewer system management document. The audits focus on evaluating the effectiveness of the SSMP in preventing spills and the City’s compliance with the General Order, including identification of any deficiencies in the SSMP in addressing ongoing spills and discharges to Waters of the State and any necessary modifications to the SSMP to correct those deficiencies.

Documents are saved electronically on the City’s shared drive. When needed, hard copies are filed with the Utilities Department. These documents are available to all staff dealing with the management of the program.

A. Training
Water Resources Division field employees are provided financial incentives for obtaining certifications above those required for their positions.

B. Targets and Objectives
The City’s objective is to maintain the current downward trend in the number of spills. The City has been able to reduce spills to below the industry standard of six per year per one hundred miles of pipe.

C. Data Management
The City has a monthly summary report that summarizes sewer system activities.

This data is easily compared with historical trends to determine the effectiveness of the program. The data is also benchmarked with industry standards to determine how well the City is doing when compared with other cities.

D. Documented Procedures
Monthly data is collected by the Wastewater Supervisor and reviewed by the Water Resources Manager. Internal audits are performed a minimum of every three years by wastewater staff. The SSMP will serve as the basis for the audit. Documented activities and overflows will be compared with the SSMP to see whether the program is being followed. The results will be compared with the City’s goals to see if the program needs to be adjusted to meet those goals.

E. Outcomes
City of Santa Maria
Sewer System Management Plan
The program audit results will be documented in a report, which will serve as the basis for procuring funding and other resources to adjust the program to meet the long-term goals.

City of Santa Maria
Sewer System Management Plan
Section XI – Communication Program
Much of the City’s Sewer System Management Program was already in place prior to the requirement by the State to develop one. Stakeholder groups are given the opportunity to provide input to the City in the development of its standards, ordinances, and rates.

Each of the potential stakeholder groups is listed below, with a brief description of their involvement with the process:

Ratepayers and local neighborhood associations
Through the Proposition 218 process, ratepayers have input into proposed rate increases.

Through the environmental review process, both ratepayers and local neighborhood associations have input into the local impacts of capital programs.

Developers and Developer Associations
The City continues to have a positive working relationship with local developers, who provide regular input on design standards and drawings and fee increases.

Restaurants
The FOG program has been an element of the City’s Municipal Code for a number of years. The requirements for controlling fats, oils, and grease are clearly spelled out, and overall, restaurants have been cooperative in ensuring requirements are met.

Environmental Groups
The City has very little exposure to live streams or the ocean, and spills that have occurred within the service area tend to stay within the curb and gutter system of the City.

Environmental groups have not become directly involved in management of the City's sanitary sewer system.

Other City Departments
The City Attorney’s Office has been instrumental in ensuring the City’s Utilities Department has the legal authority to implement the SSMP. The City’s Public Works Department Engineering Division has developed standard specifications and drawings that achieve a working and maintainable sanitary sewer system.

Regulators
The City has implemented its Emergency Response Plan to the satisfaction of local regulators. As the implementation of the SSMP has resulted in a decrease in sanitary sewer overflows, the plan appears to be working as it should, and the City welcomes the oversight of local regulators to verify its effectiveness.

City of Santa Maria
Sewer System Management Plan
Industrial Dischargers
Pretreatment standards were first established within the City’s Municipal Code in 1983.

Being already regulated through the City's Municipal Code, the City's Industrial Dischargers have not had direct involvement in management of the City's sanitary sewer system.

Labor Unions and Employee Organizations
The City has prepared and implemented its SSMP within the confines of the City’s existing Memorandum of Understanding with the employee union. Therefore, the involvement of the labor unions and employee organizations has been minimal.

Engineering Consultants
The City maintains a positive working relationship with local engineering consultants, who provide regular input on design standards and drawings. Consulting opportunities are bid out to provide engineering consultants an opportunity to work with the City.

Contractors
The City maintains a positive working relationship with several local contractors that are willing to quote and work on City projects that may be beyond the scope of City staff.

Governing Council
Efforts to improve sanitary sewer operations have been fully supported by the City Council, who in turn fully funds programs to make sewer main repairs.

City of Santa Maria
Sewer System Management Plan
Appendix A
Monitoring and Reporting Program Order No. WQ 2022-0103-DWQ VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX B URBAN WATER MANAGEMENT PLAN

City of Santa Maria
2020 Urban Water
Management Plan
Utilities Department
Prepared by:

Provost & Pritchard Consulting Group
455 W Fir Ave, Clovis, CA 93611-0242
Date signed: 6-21-21

CITY OF SANTA MARIA
2020 URBAN WATER MANAGEMENT PLAN
i
Table of Contents
Lay Description of Urban Water Management in the City of Santa Maria..........................................1 Introduction and System Overview.................................................................................1-1 Introduction..............................................................................................................................1-1 2015 UWMP Organization ......................................................................................................1-1 System Overview.....................................................................................................................1-1 Plan Preparation ...............................................................................................................2-1 Basis for Preparing a Plan........................................................................................................2-1 UWMP Preparation..................................................................................................................2-1 System Description............................................................................................................3-1 Service Area Physical Description...........................................................................................3-1 Demographics..........................................................................................................................3-1 Service Area Population...........................................................................................................3-4 City of Santa Maria System Population Projections................................................................3-6 Service Area Climate ...............................................................................................................3-6 System Water Use .............................................................................................................4-1 Customer Connections.............................................................................................................4-1 Current and Projected Water Use.............................................................................................4-1 Low Income Projected Water Demands ..................................................................................4-2 Sales to Other Water Agencies ................................................................................................4-3 Additional Water Uses and Losses ..........................................................................................4-3 Estimating Future Water Savings ............................................................................................4-5 Climate Change Impacts to Water Demands...........................................................................4-5 Baselines and Targets .......................................................................................................5-1 Baseline and Targets................................................................................................................5-1

5.1.1 Baseline Water Use ........................................................................................................................5-1

5.1.2 Water Use Targets..........................................................................................................................5-1

5.1.3 Minimum Water Use Reduction Requirements........................................................................5-3

5.1.4 Target Attainment..........................................................................................................................5-3 System Supplies.................................................................................................................6-1 Water Sources..........................................................................................................................6-1

6.1.1 City Production Facilities..............................................................................................................6-2 Wholesale Supplies..................................................................................................................6-4

CITY OF SANTA MARIA
2020 URBAN WATER MANAGEMENT PLAN
ii
Return Flows............................................................................................................................6-4 Groundwater ............................................................................................................................6-4

6.4.1 Developed Basin Supplies.................................................................................................................6-5

6.4.2 Stipulated Judgment and Water Rights...........................................................................................6-5

6.4.3 Existing and Projected Groundwater Use......................................................................................6-6 Transfers and Exchanges .........................................................................................................6-8 Desalinated Water Opportunities.............................................................................................6-8

6.6.1 Brackish or Groundwater Desalination......................................................................................6-8

6.6.2 Seawater Desalination....................................................................................................................6-9 Recycled Water Opportunities.................................................................................................6-9

6.7.1 Wastewater Quantity, Quality, and Current Uses.....................................................................6-9

6.7.2 Potential Use................................................................................................................................ 6-10

6.7.3 Optimization and Incentives for Recycled Water Use.......................................................... 6-10 Climate Change Impacts to Water Supplies...........................................................................6-10 Future Water Projects.............................................................................................................6-11 Water Provided by Wholesale Agency ..................................................................................6-11 Energy Consumption .............................................................................................................6-12 Water Supply Reliability ..................................................................................................7-1 Supply Reliability ....................................................................................................................7-1

7.1.1 CCWA’s Water Supply Reliability ...............................................................................................7-1

7.1.2 Reliability of Return Flows...........................................................................................................7-1

7.1.3 Groundwater Supply Reliability...................................................................................................7-1

7.1.4 City of Santa Maria’s Water Supply Reliability ..........................................................................7-2 Normal Water Year Analysis...................................................................................................7-4 Single-Dry Year Analysis........................................................................................................7-5 Multiple-Dry Year Analysis.....................................................................................................7-5 Drought Risk Assessment ........................................................................................................7-6 Resource Optimization.............................................................................................................7-6

7.6.1 Water Quality..................................................................................................................................7-7 Climate Change Impacts to Water Reliability .........................................................................7-8 Water Shortage Contingency Planning...........................................................................8-1 Demand Management Measures .....................................................................................9-1 Water Waste Prevention Ordinances .......................................................................................9-1 Metering...................................................................................................................................9-1 Conservation Pricing................................................................................................................9-2

CITY OF SANTA MARIA
2020 URBAN WATER MANAGEMENT PLAN
iii
Public Education and Outreach................................................................................................9-2

9.4.1 Public Information Programs ......................................................................................................9-2

9.4.2 Education Programs......................................................................................................................9-3

9.4.3 Impacts of COVID-19 on Public Education and Outreach...................................................9-3 Programs to Assess and Manage Distribution System Real Loss............................................9-4 Water Conservation Program and Staffing Support.................................................................9-4 Other Demand Management Measures....................................................................................9-5

9.7.1 Other Demand Management Measures......................................................................................9-5 California Urban Water Conservation Council........................................................................9-6 Plan Adoption, Submittal, and Implementation ..........................................................10-1 Notice to Cities and Counties Regarding UWMP Review ....................................................10-1

10.1.1 Notification Requirement – 60 Days Prior to Review/Adoption Hearing ....................... 10-1 Plan Adoption, Submittal, and Implementation.....................................................................10-2 References........................................................................................................................11-1 List of Figures
Figure-1-1: City of Santa Maria System Location Map.............................................................................1-2 Figure 3-1: Santa Maria’s City Service Area.............................................................................................3-2 Figure 3-2: Zoning Map.............................................................................................................................3-3 Figure 3-3: Maria’s City Service Area .......................................................................................................3-5 Figure 3-4: Monthly Average Temperature Range in Santa Maria based on 69 Years Historical Data .....3-8 Figure 3-5: Monthly Average Precipitation in Santa Maria based on 69 Years Historical Data ................3-8 Figure 4-1: Customer Connections (2020).................................................................................................4-1 Figure 5-1: Historical Per Capita Water Use (excluding exports or sales to other agencies).....................5-4 Figure 6-1: City of Santa Maria Production Facilities...............................................................................6-3 List of Tables
Table 3-1: Population – Current and Projected..........................................................................................3-6 Table 3-2: Monthly Average Climate Data Summary for Santa Maria .....................................................3-7 Table 4-1: Water Use – Actual, 2020.........................................................................................................4-2 Table 4-2: Water Use – Projected, 2025, 2030, 2035, 2040, and 2045......................................................4-2 Table 4-3: Low-Income Projected Water Demands (AF) for City of Santa Maria ....................................4-3 Table 4-4: Sales to Other Water Agencies .................................................................................................4-3 Table 4-5: Water Loss Audits (2016-2020)...............................................................................................4-4 Table 4-6: Summary of Current and Projected Water Losses....................................................................4-4 Table 4-7: Impacts of Climate Change on the Region by Mid-Century. ...................................................4-6 Table 5-1: Summary of Base Period Ranges of the City of Santa Maria...................................................5-1 Table 5-2: Base Daily Per Capita Water Use (10- to 15-year Range) of the City of Santa Maria.............5-2 Table 5-3: Base Daily per Capita Water Use (5-year Range) of the City of Santa Maria..........................5-2 Table 6-1: Current and Projected Water Supplies (AF/YR) for the City of Santa Maria ..........................6-2 Table 6-2: Wholesale Supplies – Existing and Planned Sources of Water (long-term average)...............6-4 Table 6-3: Groundwater Pumping Rights..................................................................................................6-7

CITY OF SANTA MARIA
2020 URBAN WATER MANAGEMENT PLAN
iv
Table-6-4: Wells and Well Capacity in the City of Santa Maria System ..................................................6-7 Table 6-5: Groundwater Pumping History 2016-2020 ..............................................................................6-7 Table 6-6: Projected Groundwater Pumping Amounts by the City of Santa Maria from 2025 to 2045....6-8 Table 6-7: Transfer and Exchange Opportunities......................................................................................6-8 Table 6-8: Current and Projected Wastewater.........................................................................................6-10 Table 6-9: Retail Agency Demand Projections From Wholesale Suppliers ............................................6-12 Table 6-10: Energy Intensity ...................................................................................................................6-12 Table 7-1: Supply Reliability for the City of Santa Maria for Year 2040 .................................................7-3 Table 7-2: Basis of Water Year Data .........................................................................................................7-4 Table 7-3: Comparison of Projected Normal Year Supply (AF) and Demand for Normal Water Year (AF) ...................................................................................................................................................................7-5 Table 7-4: Comparison of Projected Supply (AF) and Demand for Single-Dry Year (AF).......................7-5 Table 7-5: Comparison of Projected Supply and Demand for Multiple-Dry Years...................................7-6 Table 10-1: Coordination with Agencies.................................................................................................10-1 Appendices
Appendix A – Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al., Case No. 770214 (Superior Court of the State of California, County of Santa Clara, June 30, 2005) Appendix B – AWWA Water Audit Loss Tables
Appendix C – DWR UWMP Tables
Appendix D – Central Coast Water Authority Future Projections Appendix E – Section 4.2, Regional Recycled Water – Excerpt from Santa Barbara County Long Term Water Supply Report
Appendix F – Reduced Delta Reliance Analysis
Appendix G – 2019 Water Quality Report
Appendix H – 2021 Water Shortage Contingency Plan
Appendix I – Ordinances, Resolutions, and Municipal Code Sections Appendix J – Supporting Documentation: Adoption, Submittal, and Implementation Appendix K – UWMP Checklist

CITY OF SANTA MARIA
2020 URBAN WATER MANAGEMENT PLAN
v
List of Abbreviations
AF Acre-Feet
AMI Advanced Metering Infrastructure
BMPs Best Management Practices
CCWA Central Coast Water Authority
CII Commercial, Industrial, Institutional
CUWCC California Urban Water Conservation Council
CWC California Water Code
DAC Disadvantaged Community
DOF Department of Finance, California
DWR Department of Water Resources, California
ETo Evapotranspiration
GPCD Gallons per Capita per Day
GPD Gallons per Day
GPM Gallons per Minute
GSWC Golden State Water Company
IRWM Integrated Regional Water Management
IRWMP Integrated Regional Water Management Plan
MOU Memorandum of Understanding
NCSD Nipomo Community Services District
SB Senate Bill
SBCAG Santa Barbara County Association of Governments
SMVWCD Santa Maria Valley Water Conservation District
SWP State Water Project
TOC Total Organic Carbon
TDS Total Dissolved Solids
ULFT Ultra Low-Flow Toilet
UWMP Urban Water Management Plan
WWTP Wastewater Treatment Plant
WRCC Western Regional Climate Center
YR Per Year

LAY DESCRIPTION OF URBAN WATER MANAGEMENT
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
1 Lay Description of Urban Water Management in
the City of Santa Maria
This 2020 Urban Water Management Plan (UWMP) has been prepared for the City of Santa Maria (City) in Santa Barbara County, California. This document describes the City’s water supply, water demands, water reliability, and water conservation efforts. This document provides estimated population growth and water demand through the year 2045 and serves as a long-range planning document for the City. This document is an update to the City’s 2015 UWMP.

In 2020, the City had an estimated population of 107,353 and served water to 22,888 homes, businesses, and other facilities. Currently, the City obtains its water from two sources: State Water Project surface water imported from northern California through a series of canals and pipelines and groundwater that is pumped to the surface with several wells. The groundwater basin is recharged with water from Twitchell Reservoir. These sources are expected to provide adequate water through the year 2045.

The State of California set a goal for all Cities to reduce their water use by 20% and to achieve this goal by the year 2020. To reach this goal, the City needs to limit water use to 118 gallons per day for each person. In 2020, the City met this goal with a per person use of 109 gallons per day and will continue water conservation programs to keep meeting this goal in the future.

The City has special water conservation programs that can be implemented in the event of drought or other water supply issues. The City is also prepared to respond to a water supply interruption from an emergency.

These measures are documented in an updated Water Shortage Contingency Plan, which is included in this document. The City will typically not experience water shortages unless there is a catastrophic interruption of supply.

CHAPTER ONE: INTRODUCTION AND SYSTEM OVERVIEW
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
1-1
Introduction and System Overview
Introduction
The Urban Water Management Plan (“UWMP”) for the City of Santa Maria (“City” or “Santa Maria”) is prepared in compliance with Division 6, Part 2.6, of the California Water Code (“CWC”) §§ 10610-10656 as last amended by Senate Bill (“SB”) 606, the Urban Water Management Planning Act (“Act”). The original bill was enacted in 1983 and has been amended more than 20 times since then. Increased emphasis on drought contingency planning, water demand management, reclamation, and groundwater resources has been provided through the updates to the original bill. In addition to some changes in the Act since the last UWMP was submitted in 2015, there is a continued focus on water use reduction strategies and drought preparation. 2015 UWMP Organization
The City last prepared its 2015 UWMP in 2016, as allowed by law. This document is an update to the 2015 UWMP. The 2020 UWMP was restructured following the California Department of Water Resources (“DWR”) 2020 UWMPs Guidebook for Urban Water Suppliers - Final, March 2021 (“Guidebook”) (California Department of Water Resources, 2021) and new elements required for the 2020 UWMP have been included.

Each chapter in this UWMP follows the outline provided in the Guidebook.

All reporting of water use throughout this report is on a calendar year basis, and all water figures are in units of acre-feet (“AF”).

System Overview
The City is a charter city located in the Santa Maria Valley of Santa Barbara County, about 180 miles north of Los Angeles. The City Utilities Department provides water distribution and wastewater collection, treatment, and disposal services to the City and to a few small areas outside its city limits. The unincorporated community of Orcutt receives its water supply primarily from Golden State Water Company (“GSWC”), a private entity.

The City’s Public Water System Number is CA4210011.

Historically, the City pumped water from the Santa Maria Valley Groundwater Basin (“Basin”) as its sole water supply. The City began receiving State Water Project (“SWP”) water from the Central Coast Water Authority (“CCWA”) via the Coastal Branch Aqueduct in 1997. The SWP water augments local groundwater supplies and is generally higher-quality water. The Basin is under a court-ordered settlement agreement, further described in Chapter 6 and a copy is included as Appendix A. Under this agreement, the City derives a portion of its water supply from local groundwater, associated return flows to the aquifer from imported SWP water that may be recaptured in the Basin, and a share of the yield of the recharge from Twitchell Reservoir operations.

The service area is primarily characterized by residential and commercial land use. Figure-1-1 illustrates the location of the City.

CHAPTER ONE: INTRODUCTION AND SYSTEM OVERVIEW
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
1-2
Figure-1-1: City of Santa Maria System Location Map
CHAPTER TWO: PLAN PREPARATION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
2-1
Plan Preparation
Basis for Preparing a Plan
Under current law, urban water suppliers with more than 3,000 service connections or water use of more than 3,000 AF annually are required to submit to the DWR an UWMP every five years. The City owns a public water system with 22,888 active domestic water service connections1 producing 13,107 AF of water in 2020.

Therefore, the City is required to complete this document as a retail water supplier. The deadline for adoption of a water supplier’s 2020 UWMP is July 1, 2021.

The City is preparing this UWMP independently and it covers the City water service area. This UWMP is not part of a regional effort or regional alliance.

UWMP Preparation
The City prepared this most recent update to its UWMP. During preparation, documents prepared by the City and other entities were reviewed, and the results of those documents were incorporated as applicable into this UWMP. The list of documents is provided in Chapter 11.

The adopted UWMP wase available for public review during regular business hours at the City Utilities Department located at 2065 East Main Street, Santa Maria, California, or on the City website2. Copies of the UWMP were submitted to the DWR, cities and counties within the service area, the California State Library, and other applicable agencies within 30 days as required by §§ 10644 and 10645. 1 As of December 31, 2020
2 http://www.cityofsantamaria.org/utilities
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-1
System Description
Service Area Physical Description
The City is bounded on the north by the Santa Maria River and the San Luis Obispo County line. Figure 3-1 illustrates the City’s service area and current planned expansion areas. The service area is primarily characterized by residential and commercial land use. The service area boundary also includes developed and undeveloped land area to the west, south, and east of the city limits.

Demographics
The City’s service area outside the city limits currently includes small portions of primarily undeveloped parcels in unincorporated Santa Barbara County. As those areas are generally not currently served with City water, the city limits were chosen to be demographically representative of the whole service area.

According to the United States Census Bureau (“US Census”) data estimates, Santa Maria has an average household size of 3.77 persons (United States Census Bureau, 2015-2019). The entire City does not meet the definition of a Disadvantaged Community (“DAC”). The definition of a DAC is a community with an annual median household income that is less than 80 percent of the statewide annual median household income. The estimated median household income for Santa Maria is $59,366 in 2018 dollars. The median household income for California is $63,783 in 2018 dollars. Therefore, the median household income for Santa Maria is 93.1 percent of the statewide annual median household income. However, the DAC Mapping Tool on the State website (California Department of Water Resources, 2018) shows Santa Maria as having mostly DAC status of one form or another.

Figure 3-2 is a Zoning Map for Santa Maria showing the distribution of different types of land uses.

Residential developments represent the majority of land use in Santa Maria with a predominance of single-family homes. The remaining portion of the City’s land use is divided among industrial and commercial uses.

This preference for single-family housing is expected to continue; however, the City has seen a significant increase in multi-family residences in recent years as property values have increased. In the future, development of affordable multi-family housing units may be constructed within the Santa Maria service area and planned expansion areas.

The City of Santa Maria area experienced average annual population growth of 2.38% between 1992 and 2015, and approximately 1.0% from 2015 to 2020. The City is expected to grow at an average annual rate of about

1.0% between 2020 and 2045; however, growth is expected to start at 1.8% and gradually decline to less than

0.5% per year by 2045.

CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-2
Figure 3-1: Santa Maria’s City Service Area
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-3
Figure 3-2: Zoning Map
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-4
Service Area Population
A portion of the City’s service area lies outside the city limits within unincorporated areas of Santa Barbara County. The City provides water to a portion of that unincorporated area, which is approximately 99 acres of land. A small portion comprised of about 96 acres within the City limits is served by GSWC. Overall, the City’s service area comprises more than 95 percent of the City area. Figure 3-3 illustrates the City’s service area and GSWC’s service area.

Following the Technical Methodology 2 described in Methodologies for Calculating Baseline and Compliance Urban per Capita Water Use (California Department of Water Resources, 2016), the service area population was estimated. The City is a retail water supplier that falls into the Category 1 supplier, which means the City’s actual distribution area overlaps substantially3 with the City boundary. A few residents may be served by private wells, but they represent less than 0.1% of the population and were not included in population estimates.

Past population data provided by the DOF was used for calculating the historic trends in population dynamics.

That data was also used for developing the baseline and target for the water conservation plan. The current population was based on estimates from Business Infoline. Data from the Santa Barbara County Association of Governments (“SBCAG”) Regional Growth Forecast (Santa Barbara County Association of Governments, 2012) was used to develop estimates of future population within the City. The SBCAG report projected different growth rates for each five-year period in the future. Water demand projections presented in Chapter 4 are based on the population projections provided by SBCAG. 3 Greater than 95%
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-5
Figure 3-3: Maria’s City Service Area
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-6
City of Santa Maria System Population Projections
The population served within the City’s boundaries was 107,535 in 2020 based on Business Infoline. This value was used in the UWMP. This value is similar to the Department of Finance population estimate of 107,205 for 2020. The population served within the City’s boundaries is expected to reach 135,410 by 2040. A summary of historic and projected population within the City’s service boundaries is presented in Table 3-1.

The City’s 2010 UWMP predicted the 2015 population to reach approximately 102,300, and 2020 population to reach 109,500. The population in 2015 and 2020, as presented in this report, are 102,087 and 107,353, respectively. The population for year 2015 was almost identical to the estimates in the previous 2010 report, whereas the population for year 2020 is slightly less than estimated in the previous 2010 report.

Table 3-1: Population – Current and Projected
Year Service Area Population Data Source
2010 99,553 DOF
2015 102,087 DOF
2020 107,353 Business Infoline
2025 116,907 SBCAG
2030 122,402 SBCAG
2035 127,910 SBCAG
2040 133,410 SBCAG
2045 135,411 SBCAG
Service Area Climate
The Western Regional Climate Center (WRCC) website maintains historical climate records for 69 years4 for Santa Maria (Western Regional Climate Center, 2016). Table 3-2 presents the monthly average climate summary based on this 69-year historical data for Santa Maria. In winter, the lowest average minimum monthly temperature is 39 degrees Fahrenheit while the highest maximum monthly average temperature reaches 74 degrees Fahrenheit in the summer, as presented in Figure 3-3. Figure 3-4 presents the monthly average precipitation based on the 69-year historical data.

The typical rainy season in Santa Maria is from November to March. Monthly precipitation during the winter months ranges from one to two inches. Average annual rainfall is about 13 inches. Low humidity occurs in the summer months from May to October. The moderately hot and dry weather during the summer months typically results in moderately high summer water demand.

Similar to the WRCC in the Santa Maria area, the California Irrigation Management Information System website tracks and maintains records of evapotranspiration (“ETo”). ETo statistics used for this system also come from the Santa Maria station (Santa Maria II, #232). ETo is a standard measurement of environmental parameters that affect the water use of plants. ETo is given in inches per day, month, or year, and is an estimate of the evapotranspiration of a large field of well-watered, cool-season grass that is four to seven inches tall. 4 January 1, 1948 to June 9, 2016
CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-7
The monthly average ETo is presented in inches in Table 3-2. As indicated, a greater quantity of water evaporates from May through August, which may result in higher water demand (California Irrigation Management Information System, 2020).

Table 3-2: Monthly Average Climate Data Summary for Santa Maria Month Standard Monthly
Average ETo(1) (inches)
Average Total Rainfall(2)
(inches)
Average Temperature(2)
(degrees Fahrenheit)
Max Min
January 2.2 2.53 63.3 39.0
February 2.7 2.73 64.3 40.9
March 3.9 2.31 64.8 42.0
April 4.8 1.06 66.9 43.5
May 5.6 0.28 68.3 46.8
June 5.6 0.05 70.6 50.1
July 5.5 0.03 72.8 53.1
August 5.2 0.03 73.2 53.6
September 3.7 0.19 74.4 52.2
October 3.6 0.52 73.5 48.1
November 2.3 1.32 69.2 42.6
December 1.8 1.96 64.3 38.7
Notes

1. Evapotranspiration Overview (ETo) from http://www.cimis.water.ca.gov

2. Rainfall and Temperature data from http://www.wrcc.dri.edu CHAPTER THREE: SYSTEM DESCRIPTION
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
3-8
Figure 3-4: Monthly Average Temperature Range in Santa Maria based on 69 Years Historical Data Figure 3-5: Monthly Average Precipitation in Santa Maria based on 69 Years Historical Data CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-1
System Water Use
Customer Connections
The City provides water for residential, commercial, industrial, and landscape irrigation customers. Figure 4-1 below shows the number of connections by customer category. The majority of connections are classified as single-family residential. From 2015 to 2020, the total number of connections increased by 13% from 20,288 to 22,888.

Figure 4-1: Customer Connections (2020)
Current and Projected Water Use
Actual water use data from 2020 was analyzed to estimate the City’s future water use. Past water use is not necessarily indicative of future water use due to water use changes brought about by conservation, such as turf removal and low-flow fixtures. Projections for future water use were calculated for the years 2025 through 2045 in five-year increments. Future water demands were estimated using a population-based approach.

Historical water use records from 2020 were sorted by customer type into the following categories: single-family, multi-family, industrial, commercial, landscape, sales to other agencies and a category for “other” uses.

Table 4-1 shows actual 2020 water use data for various categories. Table 4-2 shows projected water demands for years 2025 through 2045 based on population growth and the 2020 per capita water usage of 109 gallons per capita per day.

CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-2
Table 4-1: Water Use – Actual, 2020
Water use sectors Total Volume (AF)
Single-family 5,398
Multi-family 1,885
Commercial 1,950
Industrial 722
Landscape 1,430
Sales/exchanges to other agencies 1,117
Losses 488
Other 254
Total 13,244
Table 4-2: Water Use – Projected, 2025, 2030, 2035, 2040, and 2045 Water use sectors 2025 2030 2035 2040 2045
Single-family 5,878 6,155 6,432 6,708 6,809
Multi-family 2,053 2,149 2,246 2,343 2,378
Commercial 2,124 2,223 2,323 2,423 2,460
Industrial 786 823 860 897 911
Landscape 1,557 1,630 1,704 1,777 1,804
Sales/exchanges
to other agencies
1,820 3,420 3,420 3,420 3,420
Losses 531 556 581 606 615
Other 277 290 303 316 320
Total 15,026 17,247 17,869 18,490 18,716
Low Income Projected Water Demands
The estimated low-income water use projections for single-family and multi-family housing units are presented in Table 4-3. These projections are included in the overall water use projections provided in Table 4-1through Table 4-2.

Per 2010 US Census data, approximately 18 percent of households in Santa Maria belong to the low-income group (United States Census Bureau, 2010). Therefore, 18 percent of the projected water demands are assumed to be for households in the low-income group.

CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-3
Table 4-3: Low-Income Projected Water Demands (AF) for City of Santa Maria Low-Income Water
Demands
2020 2025 2030 2035 2040 2045
Single-family residential 972 1,058 1,108 1,158 1,207 1,226 Multi-family residential 339 369 387 404 422 428
Total 1,311 1,428 1,495 1,562 1,629 1,654
Sales to Other Water Agencies
Table 4-4 provides a summary of projected water sales to other agencies from the City’s system. These projected water sales include amounts that the City has agreed to supply to other agencies. The City’s water portfolio includes groundwater rights leases to the Orcutt area, interagency potable water exchanges with GSWC, and water sales to the Nipomo Community Services District (“NCSD”).

Orcutt groundwater leases are a long-term lease of groundwater rights and do not affect the City’s water supply infrastructure. Except for the first 20 AF per year (“YR”), GSWC’s potable water exchanges involve an exchange of GSWC’s State Water Project allocation for the City’s potable water supply.

Water sales to NCSD involve potable water delivery and use of the City’s water supply infrastructure. The agreement between NCSD and the City requires that the City deliver and NCSD pay for a minimum 645 AF for the first year of delivery (Fiscal Year 2015-2016); 800 AF for years 2 through 5 (FY 2016-2020); 1,000 AF for years 6 through 10 (FY 2020-2025); and 2,500 AF from year 11 (FY 2025-2026) through June 30, 2085.

The City’s projected sales to other agencies are included as a portion of the City’s total demands in Table 4-4.

Table 4-4: Sales to Other Water Agencies
Water
Sales
Water Distributed 2020 2025 2030 2035 2040 2045
GSWC 20 20 20 20 20 20
NCSD(1) 800 1,000 2,500 2,500 2,500 2,500
Orcutt(2) 600 800 900 900 900 900
Total 1,420 1,820 3,420 3,420 3,420 3,420
Notes:

1. NCSD may request delivery of Supplemental Water in excess of the above quantities up to an additional 3,200 AF/YR in accordance with the Wholesale Water Supply Agreement dated 05/07/2013 between the City of Santa Maria and Nipomo Community Services District (City of Santa Maria, 2013)

2. The City leases groundwater rights to Orcutt and their use does not impact City infrastructure Additional Water Uses and Losses
Water losses must be incorporated when projecting total water demand. Water losses are defined as the difference between annual production and supply, and annual sales. This includes system losses due to leaks, reservoir overflows, inaccurate meters, unauthorized (unmetered) use, and water used in operations.

CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-4
System water losses were calculated using American Water Works Association (AWWA) Free Water Audit Software. The software uses inputs from volume of water supplied, volume of water delivered, metering error percentage, and metering confidence levels to calculate apparent, unauthorized, and real losses.

The AWWA software assumes an additional 1.25% of the total volume supplied is used for authorized, unmetered activities such as line flushing for mains and hydrants and firefighting.

The difference between volume supplied and volume delivered plus the unmetered consumption is the calculated loss. This value is then broken into apparent loss, caused by metering errors and data handling inaccuracies, and real loss, leakage, and unauthorized, unmetered water consumption. Table 4-5 below shows total water loss calculated by AWWA software. Copies of the AWWA Audit Tables are presented in Appendix B.

Table 4-5: Water Loss Audits (2016-2020)
Reporting Period Volume of Water Loss
2016 511
2017 232
2018 670
2019 646
20201 488
Average 469
1 – 2020 audit has not been completed yet and is based
on the average of the 2016-2019 audits
Table 4-6 provides a summary of current and projected water losses in the City’s system. Water loss in 2015 was substantially higher than normal because of a significant water leak. In addition, an audit of accounts showed numerous water meters were not read. Rectifying these two issues resulted in a significant reduction in water loss after 2015.

Table 4-6: Summary of Current and Projected Water Losses Water Use Type 2015 2020 2025 2030 2035 2040 2045
Saline Barriers 0 0 0 0 0 0 0
Groundwater Recharge 0 0 0 0 0 0 0
Conjunctive Use 0 0 0 0 0 0 0
Raw Water 0 0 0 0 0 0 0
Recycled Water 0 0 0 0 0 0 0
Other 0 0 0 0 0 0 0
System Losses 1,211 488 531 556 581 606 615
Total 1,211 488 531 566 581 606 615
CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-5
Estimating Future Water Savings
The City of Santa Maria has adopted ordinances to reduce water waste. These ordinances and policies are described in Chapter 8 and Chapter 9. The City also meets its 2020 per capita goal, as described later in Chapter 5, and intends to continue meeting this goal.

Water savings from codes, standards, ordinances, or transportation and land use plans are also known as “passive savings.” These various factors generally decrease the water use for new and future customers, compared to historical customers. These codes and ordinances may include implementation of city ordinances, the California Energy Commission Title 20 appliances standards for toilets, urinals, faucets, and showerheads, and the CALGreen Building Code.

Passive savings have not been specifically incorporated into projected water demands. Instead, future water demands are projected based on population and the City's target per capita water use, as documented in Chapter 5, and discussed above. However, the City does expect that passive savings, such as continued implementation of city ordinances/codes and new building standards will help the City continue to meet its target per capita water demand in the future.

Climate Change Impacts to Water Demands
General Information
DWR guidelines require urban water suppliers to consider the potential effects related to climate change in the UWMP as it relates to water demands, water supply, and water supply reliability. These topics are addressed in Chapters 4, 6, and 7 of the UWMP, respectively. Climate change model projections indicate that California in general can expect to be impacted by the following:
• Increased temperatures
• Changes in the timing and quantity of precipitation
• Increased risk of wildfires
• Increased risk of flooding, and
• Sea-level rise
The Santa Barbara County Integrated Regional Water Management Plan (IRWMP, 2019, Dudek) presented a summary of climate change findings from various studies and models, which is included in Table 4-7.

CHAPTER FOUR: SYSTEM WATER USE
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
4-6
Table 4-7: Impacts of Climate Change on the Region by Mid-Century.

Impacts to Water Demands
The IRWMP identifies the primary effect expected from climate change in the future is an increase in average global temperature. By end of this century, temperatures in the Central Coast area are projected to increase 4°–5°Fahrenheit during the winter and 5°–6°Fahrenheit during the summer. Increases in temperature may be expected to impact water resources through changes to precipitation patterns, evapotranspiration rate increases, increased customer water use, increased wildfire potential, and faster snowmelt.

The IRWMP also noted the frequency of extreme hot days was also projected to increase significantly from 3 to 4 extreme hot days in the historical period (1985–2014), 6 to 10 extreme hot days by 2030, 9 to 18 extreme hot days by 2050, and 23 to 43 extreme hot days by 2090.

As climate change becomes noticeable and quantifiable, the City’s response will include reducing demands to match possible reduction of water supplies. At this point, impacts from possible climate change are not quantifiable. Reduction of the per capita demands in the system can help respond to climate change in two ways. Reduced water demands equate to less energy use through reduced groundwater pumping and/or movement of water supplies through the system. Further reduction of per capita water demands may be challenging to achieve, as the City has already implemented many demand management or conservation methodologies (discussed in further detail in Chapter 9).

It is anticipated climate change will result in increase in temperatures and more hot days will impact landscape water demands; however, as the City has a goal to maintain their per capita use, overall water demands are not anticipated to increase. Temperature rises will translate to increased evapotranspiration rates. Mitigating possible increased water demands for landscape may require less landscaping, increased use of drought tolerant plantings, or more efficient irrigation strategies. The City has landscaping policies in place to encourage water conservation in new developments as discussed in Chapter 9.

CHAPTER FIVE: BASELINES AND TARGETS
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
5-1
Baselines and Targets
Baseline and Targets
As part of the UWMP, regulations require that water suppliers quantify past and current water use and project the total water demand for the water system, including calculations of its baseline5 water use and interim and urban water use targets. Projections of future water demand allow a water supplier to analyze if future water supplies are adequate, as well as help the agency when sizing and staging future water facilities to meet water use targets. Projected water use, combined with population projections, provide the basis for estimating future water requirements. The complete SBX7-7 spreadsheet tables used to document this analysis are found in Appendix C.

5.1.1 Baseline Water Use
Baseline values are determined for the City per DWR methodologies included in the Methodologies for Calculating Baseline and Compliance Urban Per Capita Water Use (California Department of Water Resources, 2016). Target conservation is based on baseline water use. The baseline period is 10 years unless the water supplier provided at least 10 percent of its water supply as recycled water. The City does not meet this criteria; therefore, the City must use a 10-year range that ends no earlier than December 31, 2004, and no later than December 31, 2010. The City chose the 10-year baseline period of January 1, 1995 through December 31, 2004.

In addition, water suppliers are required to calculate water use for a five-year period ending no earlier than December 31, 2007, and no later than December 31, 2010. If 95 percent of this figure is over 100 gallons per person per day and less than the other baseline figure, then the 95 percent value becomes the 2020 target.

Table 5-1 summarizes the data associated with establishing the baseline period for the City.

Table 5-1: Summary of Base Period Ranges of the City of Santa Maria Base Parameter Value Units
10- to 15-year Base
Period
2008 Total Water Deliveries
2008 Total Volume of Delivered Recycled Water
2008 Recycled Water as a percent of Total Deliveries
Number of Years in Base Period
Year beginning Base Period Range
Year ending Base Period Range
14,472
0 0
10 1995
2004
AF
Years
5-year Base Period Number of Years in Base Period
Year beginning Base Period Range
Year ending Base Period Range
5 2003
2007
Years

5.1.2 Water Use Targets
The City adopted Method 1 described in the Guidebook to set its 2015 interim and 2020 water use targets.

This method uses 80 percent of the City’s baseline per capita water use to calculate the 2020 water use target. 5 Base daily per capita
CHAPTER FIVE: BASELINES AND TARGETS
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
5-2
Table 5-2 lists historic population and per capita water use for the 10-year base period. The base per capita water use estimate (as an average for 10 base years) is 148 Gallons per Capita per Day (GPCD). The 2020 target based on Method 1 is 0.8 x 148 GPCD = 118 GPCD.

Table 5-2: Base Daily Per Capita Water Use (10- to 15-year Range) of the City of Santa Maria Base Period Year Distribution System
Population
Daily System Gross
Water Use (AF)
Annual Daily Per
Capita Water Use
Sequence Year Calendar Year (GPCD)
Year 1 1995 69,720 13,050 167
Year 2 1996 71,127 12,773 160
Year 3 1997 72,283 12,515 155
Year 4 1998 73,891 11,079 134
Year 5 1999 75,379 11,852 140
Year 6 2000 76,913 12,714 148
Year 7 2001 78,903 12,606 143
Year 8 2002 81,434 13,340 146
Year 9 2003 83,828 13,496 144
Year 10 2004 87,732 13,650 139
Base daily per capita water use 148
Table 5-3 presents historic population and GPCD water use for the five-year period (2003 to 2007). This table indicates the population served and water supplied for each of those years within the five-year range and gross water use for each of the five years. The average base per capita water use estimated for five base years is 142.1 GPCD. This data is used to determine whether the 2020 per capita water use target meets the legislation’s minimum water reduction requirement per § 10688.22.

Table 5-3: Base Daily per Capita Water Use (5-year Range) of the City of Santa Maria Base Period Year Distribution System
Population
Daily System Gross
Water Use (AF)
Annual Daily Per
Capita Water Use
Sequence Year Calendar Year (GPCD)
Year 1 2003 83,828 13,496 144
Year 2 2004 87,732 13,650 139
Year 3 2005 91,313 13,845 135
Year 4 2006 93,385 13,615 130
Year 5 2007 94,408 14,847 140
Base daily per capita water use 138
CHAPTER FIVE: BASELINES AND TARGETS
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
5-3

5.1.3 Minimum Water Use Reduction Requirements
Since the five-year baseline per capita water use per § 10608.12(b)(3) is greater than 100 GPCD, the following calculations are used to determine whether the City’s 2015 and 2020 per capita water use targets met the legislation’s minimum water use reduction requirement per § 10608.22:

1. Calculate base daily per capita water use of 138 GPCD using a continuous five-year period ending in December 31, 2007, as presented in Table 5-3.

2. Multiply the 138-GPCD value by 0.95. The resulting value is 131 GPCD. This is the maximum allowable GPCD target in 2020.

3. The 2020 target under Method 1 is 0.8 x 148 = 118 GPCD.

4. Because Method 1 target of 118 GPCD is less than 138.0 GPCD, no further adjustment to the 2020 target is required.

5. Set 2020 target of 118 GPCD and 2015 (interim) target as 133 GPCD, halfway towards the 2020 goal.

The 2020 target of 118 GPCD for the City meets the legislation’s minimum water use reduction requirement.

The City did not adjust its compliance GPCD using weather normalization, economic adjustment, distribution area expansion, distribution area contraction, or other extraordinary events. The basis for determining these estimates include population estimates from the DOF website (California Department of Finance, 2015) and water production values from the DWR public water statistics, Form DWR 38.

5.1.4 Target Attainment
The per capita water use target for the City for 2020 is 118 GPCD (i.e., 80 percent of 148 GPCD) with an interim goal of 133 GPCD by the year 2015. Figure 5-1 shows the historical and current per capita water use.

This figure shows a 2020 water use of 109 GPCD, so the City met its 2020 goal of 118 GPCD. This is based on water use in Santa Maria and the estimated 2020 population and excludes water deliveries to other agencies.

The graph clearly shows that water conservation programs have been very successful in Santa Maria with a consistent decline in per capita water usage over the past thirty years.

CHAPTER FIVE: BASELINES AND TARGETS
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
5-4
Figure 5-1: Historical Per Capita Water Use (excluding exports or sales to other agencies) Baseline (148 gpc/day)
1994-2004
Interim Target (133 gpc/day) 2015
Target 118 gpc/day) 2020
100.00
110.00
120.00
130.00
140.00
150.00
160.00
170.00
180.00
1985 1990 1995 2000 2005 2010 2015 2020 2025
GPC/Day
Year
20 X 2020
Annual Water Use per Capita
CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-1
System Supplies
Water Sources
The City’s water portfolio is comprised of the following available water supply sources: local groundwater, purchased water from the SWP, associated return flows recaptured from the Basin, assigned rights to water from the Basin, and assigned rights to augmented yield from Twitchell Reservoir. Imported water supplies for the City are obtained from the SWP via a contract with CCWA.

Currently, groundwater is pumped from six active groundwater wells in the Basin. The City’s wells have a current total normal year active capacity of about 20,000 AF/YR. Over the period from 2016 through 2020, the extracted groundwater averaged 4,648 AF/YR. According to the latest annual hydrogeologic report (Luhdorff & Scalmanini, 2019), the groundwater basin continues to remain within historical range, which confirms the sufficiency of this water supply to meet the City’s domestic needs.

The local groundwater basin is adjudicated, and therefore, already managed. The City’s rights to rely on Basin water resources for both pumping and storage are governed by a settlement agreement (“Stipulation”) signed by a majority of the parties (Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al., Case No. 770214), commonly known as the “Santa Maria Groundwater Adjudication.” See Appendix A for Stipulation.

Table 6-1 summarizes the current and planned water supplies available to the City between 2020 and 2045.

This water supply information is based on the Stipulation and data provided by CCWA.

The City’s water supply is expected to reliably meet the projected demands through 2045. There is no direct recycled water supply planned for this system, although percolation of treated wastewater at the City’s Wastewater Treatment Plant (“WWTP”) is an indirect use of recycled water, which, in effect, improves the overall reliability of the City’s groundwater supplies.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-2
Table 6-1: Current and Projected Water Supplies (AF/YR) for the City of Santa Maria Source 2020 2025 2030 2035 2040 2045
Purchased
SWP Water(1)
10,492 10,399 10,305 10,212 10,118 10,025
Groundwater(2) 5,100 5,100 5,100 5,100 5,100 5,100
Twitchell Yield/
Commingled
Groundwater(3)
14,300 14,300 14,300 14,300 14,300 14,300
Return Flows
from SWP
Water(4)
6,820 6,759 6,698 6,638 6,577 6,516
Transfers In 0 0 0 0 0 0
Recycled
Water
0 0 0 0 0 0
Desalination
Water
0 0 0 0 0 0
Other 0 0 0 0 0 0
Total(5) 36,712 36,558 36,403 36,250 36,095 35,941
Notes:

1. Volumes shown for all years are based on the long-term reliability documented in The State Water Project Final Delivery Capability 2019 Report (California Department of Water Resources, Natural Resources Agency, 2020).

2. Groundwater supplies are based on prescriptive rights in Santa Maria Groundwater Basin as defined in the Judgement.

Pursuant to the Court’s Phase 5 Statement of Decision, the City has been assigned 5,100 AF/YR of prescriptive right.

3. Further details can be found in Exhibit “F” of the Stipulation.

4. Pursuant to the Stipulation, the City is entitled to recapture 65 percent of its SWP use in the Basin.

5. See Chapter 7 for details on these water supplies.

The City’s water supply is projected to remain relatively constant from 2020 to 2045 to meet water demands, with the majority of this demand being met by imported surface water. The City is expected to have an available supply in excess of projected demands through 2045.

6.1.1 City Production Facilities
Figure 6-1 shows the location of the City’s production facilities. The City measures flow at each of its production facilities using Water Specialties brand water meters. The City field calibrates production meters once annually. Flow is continuously measured through the City’s supervisory control and data acquisition system, and data is stored in a database. Production is calculated by averaging flow every five minutes.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-3
Figure 6-1: City of Santa Maria Production Facilities
CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-4
Wholesale Supplies
Santa Maria has a Water Supply Agreement with CCWA for 17,820 AF/YR of Table A imported SWP water.

SWP water originates within the Feather River watershed, is captured in Lake Oroville, and flows via the Sacramento-San Joaquin Delta, the California Aqueduct, and the Coastal Branch Extension, into CCWA’s treatment and conveyance facilities.

Pursuant to the Stipulation, Santa Maria agreed to import and use within the Basin no less than 10,000 AF/YR of available SWP water, or the full amount of available SWP water (yearly allocation) if the amount available is less than 10,000 AF in a given year.

Table 6-2 presents the contracted volumes available from CCWA to the City per Table A imported SWP water and the amount projected to be available to the City to meet the demands from 2025 through 2045. The average long-term reliability factor was used to determine available purchased water from CCWA. Appendix D contains CCWA-provided future projections of the volume of water to be delivered to the City.

Table 6-2: Wholesale Supplies – Existing and Planned Sources of Water (long-term average) Wholesale Sources Contracted
Volume
2020 2025 2030 2035 2040 2045
Purchased Water from SWP 17,820 10,492 10,399 10,305 10,212 10,118 10,025 Return Flows
Under the Stipulation, the City is entitled to groundwater that is a fixed percentage of the annual amount of SWP water it uses within the Basin. The fixed percentage for the City is 65 percent, based on a rolling average of the prior five years of imported water use. These return flows augment the groundwater yield in the Basin through the recharge that occurs when these sources are used within the Basin.

Groundwater
Groundwater for the City is supplied by six active wells in the Basin. The Basin has a surface area of approximately 184,000 acres, or 287.5 square miles. The Basin is bounded by the San Luis and Santa Lucia Ranges on the north, by the San Rafael Mountains on the east, by the Solomon Hills on the south, by the Casmalia Hills on the southwest, and by the Pacific Ocean on the west.

The water-bearing units are alluvium, dune sands, and the Orcutt, Paso Robles, Careaga, and Pismo Formations.

The alluvium consists of unconsolidated lenticular bodies of gravel, sand, silt, and clay. The dune sands consist of well-rounded, fine- to coarse-grained sand. The Orcutt Formation consists of sand interbedded with coarse gravel with minor amounts of silt and clay restricted to the upper parts of the unit. The Paso Robles formation consists of unconsolidated to poorly consolidated gravel, sand, silt, and clay. The Careaga Formation consists of unconsolidated fine- to medium-grained marine sand with some silt and unconsolidated to well consolidated coarse- to fine-grained sand, gravel, silty sand, silt, and clay. The Pismo formation consists of coarse- to fine-grained sand interbedded with discontinuous layers of silt and clay. Groundwater is generally unconfined, except in the coastal portions where it is confined (Luhdorff & Scalmanini, 2014).

Sources of native (natural) water to the groundwater basin include the following: infiltration of precipitation, inflow from adjacent areas, return flows from applied water (irrigation), percolation of water from streams flowing across the Basin, especially the Arroyo Grande Creek on the north and Santa Maria and Sisquoc Rivers in the south. In addition, two reservoirs, Lopez Reservoir on the Arroyo Grande Creek in the north, and CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-5
Twitchell Reservoir on the Cuyama River (a tributary to the Santa Maria River in the south), provide storage of stormwater for recharge of the Basin.

Water from the Lopez Reservoir is used directly by the coastal communities of Arroyo Grande, Pismo Beach, Grover Beach, and Oceano Community Services District, some return flows from irrigation recharges the groundwater basin locally. Reservoir releases are made to provide for groundwater recharge through the bed of the Arroyo Grande Creek into the groundwater basin underlying the Arroyo Grande area.

The Twitchell Reservoir is operated as a flood control and water conservation reservoir. Releases are controlled from Twitchell Reservoir to maximize recharge of the Basin through percolation in the Santa Maria Riverbed.

The Stipulation sets the amount of the Twitchell yield at 32,000 AF/YR. The City is entitled to 14,300 AF of that yield annually.

Groundwater discharges from the Basin includes consumptive use of groundwater by agricultural users, and municipal and industrial users (e.g., cities and the oil industry for secondary recovery of oil), and groundwater discharges to the ocean. Groundwater discharge to the ocean is required to prevent seawater intrusion into the Basin.

The total groundwater storage capacity of the Basin is approximately 2,300,000 AF (California Department of Water Resources, 2004). The large volume of groundwater in storage provides a buffer to drought conditions in the Basin.

6.4.1 Developed Basin Supplies
Since 1997, SWP water has been imported to the Basin by Oceano Community Services District and Pismo Beach in the north and the City of Santa Maria, the City of Guadalupe, and GSWC in the south. The importation of this water has reduced the stress on the Basin through a reduction in groundwater pumping by those parties relying instead on SWP water. Groundwater recharge is also augmented by the return flows of imported applied waters through irrigation and wastewater discharges to percolation ponds.

6.4.2 Stipulated Judgment and Water Rights
In 1997, the Santa Maria Valley Water Conservation District (“SMVWCD”) filed a lawsuit to adjudicate water rights in the Basin (Santa Maria Valley Water Conservation District vs. City of Santa Maria, et al., Case No. 770214 (Superior Court of the State of California, County of Santa Clara, June 30, 2005). The court divided the trial of the case into phases. In January 2001, the Court issued the Phase 1 Order, which established the outermost boundaries of the Basin. In December 2001, the Court issued the Phase 2 Order, which established the area constituting the Basin for purposes of the adjudication.

In May 2004, the Court issued a Partial Statement of Decision on Phase 3 regarding the hydrologic conditions in the Basin. As part of its Phase 3 Partial Statement of Decision, the court reserved jurisdiction over remaining water rights issues and management of the Basin.

Subsequent to the Phase 3 trial, the majority of the parties to the lawsuit, including the original plaintiff, the SMVWCD, negotiated a settlement agreement (referred to as the “Stipulation” throughout this document) that set forth terms and conditions for a physical solution concerning the overall management of Basin water resources, including rights to use groundwater, SWP water and associated return flows, the developed groundwater yield resulting from the operation of Twitchell and Lopez reservoirs, use of Basin storage space, and the ongoing monitoring and management of these resources consistent with common law water rights priorities and Article 10, Sec. 2 of the California Constitution. The Stipulation has been signed by a majority of overlying landowners in the Basin.

The Stipulation also subdivides the Basin into three Management Areas: the Northern Cities Management Area, Nipomo Mesa Management Area, and the Santa Maria Valley Management Area (Exhibit “C” of the Stipulation CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-6
contains a map of these management areas). The delineation of these areas was based on historical development and use of Basin water resources, as further delineated in the Stipulation and the record of the Court.

As noted above, the Stipulation provides the City certain rights to water in the Basin. These rights include a recognition of the City’s highest historical use of groundwater from the Basin; the right to recapture a preset portion of the return flows from the City’s use of SWP water in the Basin; and a share of 14,300 AF/YR of the developed groundwater yield resulting from Twitchell Reservoir recharge operations. In addition, the City may access additional supply through the transfer of Twitchell Yield. Return flows from SWP water are also assignable in whole or in part, subject to accounting.

The Stipulation also establishes certain preset water shortage response measures in anticipation of reduced availability of groundwater.

Although the Court has approved the Stipulation as between those who have signed it, not all parties to the adjudication have agreed to it. Phase 4 proceeded to trial in early 2006 between the public water suppliers, including the City, and a small number of landowners that opposed the Stipulation. The Phase 4 statement of decision issued by the Court stated that the City and GSWC met the burden of showing a prescriptive right during various periods prior to the time that the Twitchell Project began recharging the Basin.

Phase 5 occurred in July of 2006. The scope of the Phase 5 trial was to allow the remaining landowners to show that they had engaged in self-help during the applicable prescriptive periods and to determine whether, and in what form, the Court should impose a physical solution on the parties’ collective future use of the Basin.

The Phase 5 statement of decision reaffirms the prescriptive rights obtained by the City and GSWC; states that those rights are correlative to the rights of the overlying landowners; and provides that the City and GSWC are entitled to those specific quantities of water in the Basin, the same as any overlying landowner. The statement of decision also states that the monitoring program contained in the Stipulation will be incorporated into the Court’s final judgment and will be binding on all parties to the litigation. Further, the Phase 5 statement of decision provides that the Court will retain jurisdiction to enforce the judgment and to implement the physical solution as necessary. The Phase 5 statement of decision further confirms the ability of the SMVWCD to allocate Twitchell Yield in the manner provided in the Stipulation.

The Santa Maria Basin Monitoring and Management Program was prepared in 2008 to provide the fundamental data for ongoing annual assessments of groundwater conditions, water requirements, water supplies, and water disposition in the Santa Maria Valley Management Area (Luhdorff & Scalmanini, 2014) to ensure that the Basin is protected and managed as a source of water for beneficial uses.

6.4.3 Existing and Projected Groundwater Use
As described above, the Stipulation provides the City certain water rights within the Basin including, but not limited to, appropriative rights to Native Groundwater and the right to New Developed Water. In addition, the City has rights to Twitchell Development Water, return flows of its imported water, and prescriptive rights as defined in the Court’s Phase 5 Statement of Decision.

Table 6-3 presents the City’s water rights of Twitchell Development Water, prescriptive rights, and return flows of its imported water. The available return flow to the City is calculated on the average quantity the City imports in the previous five years. The return flow quantity in this table is based on the reliable amount of SWP water supplies as reported by CCWA in 2021.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-7
Table 6-3: Groundwater Pumping Rights
Basin Name Pumping Rights
Twitchell Yield(1) 14,300
Native Groundwater/Prescriptive
Rights(2)
5,100
Average Return Flows of Imported Water(3) 6,516 – 6,820 Notes:

1. Further details can be found in Exhibit “F” of the Stipulation.

2. Groundwater supplies are based on prescriptive rights in Santa Maria Groundwater Basin as defined in the Judgement. Pursuant to the Court’s Phase 5 Statement of Decision, the City has been assigned 5,100 AF/YR of prescriptive rights.

3. Return flows from 2020 through 2045 are based on the projected amount of the City’s contract for annual imported water deliveries presented in Table 6-1. Available return flows may be less if the total amount of imported water is not available.

Table-6-4 shows the City’s wells and current well capacities. The City’s current well system has a total production capability of about 13,950 gallons per minute (“GPM”).

Table-6-4: Wells and Well Capacity in the City of Santa Maria System Well Name Nominal Well Capacity
(GPM) (rounded)
Nominal Well Capacity
(AF/YR) Status
9S 1,800 2,904 Active
10S 2,500 4,033 Active
11S 2,150 3,468 Active
12S 2,500 4,033 Active
13S 2,500 4,033 Active
14S 2,500 4,033 Active
Total Capacity 13,950 22,503
Table 6-5 shows the City’s groundwater pumping history for calendar years 2016 to 2020. The groundwater was pumped from six active wells located in the Basin. The City’s use of groundwater since 1997 has been greatly reduced as the City maximized its use of SWP water. Groundwater use has increased in recent years due to a reduced SWP water allocation. It is possible that the City would need to provide its entire demand from the local groundwater supply.

Table 6-5: Groundwater Pumping History 2016-2020
Basin Name 2016 2017 2018 2019 2020
Santa Maria River Valley (AF) 1,911 1,668 3,622 3,105 7,492 Groundwater as Percent of Total City Water
Supply
16 13 28 24 57
Table 6-6 shows the projected groundwater pumping amounts for the City, assuming that groundwater pumping is approximately 28 percent of total supply, the average of the last five years. The water will be pumped from the City’s six active wells or from new or replacement wells as may be required to meet existing and projected demands. The groundwater pumping amounts include water sources described in the Stipulation and Judgement. These sources consist of Twitchell Yield, prescriptive and appropriative rights to groundwater, and return flows from imported SWP water.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-8
Table 6-6: Projected Groundwater Pumping Amounts by the City of Santa Maria from 2025 to 2045 Basin Name 2025 2030 2035 2040 2045
Santa Maria River Valley (AF) 3,698 3,871 4,046 4,220 4,282 Percent of Total City Water
Supply
28% 28% 28% 28% 28%
Note: Pumping based on City use and system loss, but excludes deliveries to other agencies.

Transfers and Exchanges
The Stipulation and Judgement provide the City with quantifiable and certain water rights. Prior to the groundwater adjudication, these rights were not quantifiable. The Stipulation also establishes a framework for both permanent and temporary transfers of water rights within the Basin. Because the City has obtained quantifiable water rights, the City has greater flexibility in facilitating transfers and exchanges. The Stipulation allows permanent or temporary transfer of the developed groundwater yield associated with the operation of the Twitchell Project. The Stipulation also allows temporary transfers of agricultural pumping rights (fallowing programs) during Severe Water Shortage Conditions. These assignments are summarized in Table 6-7.

As described above, these are mechanisms that could augment the reliability of supplies during a dry period.

For example, water available through transfers and exchanges with other State Water Contractors, purchases of water through DWR dry-year water purchase programs, short-term water transfers through DWR’s Turnback Pool programs, and groundwater recharge programs operated by some CCWA project participants. In any given year, additional water can be made available through the SWP system for the incremental cost of purchasing or exchanging the water from others in the SWP.

Table 6-7: Transfer and Exchange Opportunities
Transfer Agency Transfer or
Exchange
Short Term or Long
term
Proposed Volume
Twitchell Management Authority TBD(1) TBD TBD
CCWA TBD(2) TBD TBD
Notes:

1. Transfers and exchanges under these programs will occur on an as-needed basis.

2. Includes all exchanges, transfers, or purchased water delivered via CCWA infrastructure.

Desalinated Water Opportunities
The reliability of water supply for the City could be further augmented by the desalination of brackish water and seawater by CCWA.

6.6.1 Brackish or Groundwater Desalination.

CCWA and its project participants could coordinate with other SWP Contractors and provide a mechanism for financial assistance in construction of regional groundwater desalination facilities. A list summarizing the groundwater desalination plans of other SWP Contractors is not available; however, CCWA could begin this planning effort should the need arise.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-9

6.6.2 Seawater Desalination.

CCWA was specifically formed for the purpose of “designing, building, and operating the facilities needed to deliver water from the SWP to the various entities entitled to receive that water in Santa Barbara County,” (Central Coast Water Authority, 2011). At this time, CCWA does not consider desalination to be a cost-effective method of increasing the reliability of imported water. Two CCWA project participants, however, have constructed desalination facilities. The City of Morro Bay intermittently operates its 830,000 gallons per day (“GPD”) desalination facility and the City of Santa Barbara has reinstated a previously decommissioned desalination facility.

CCWA and its project participants could collaborate in the use and/or construction of seawater desalination facilities. CCWA has been following the existing and proposed seawater desalination projects along California’s Coast. The Seawater Desalination and the California Coastal Act (California Coastal Commission, 2004) provides a summary and status of the existing and proposed seawater desalination plants along the California’s Coast. Currently, most of those existing and proposed seawater desalination facilities would be operated by agencies that are not SWP Contractors (see CCWA’s 2020 UWMP for details).

There are no specific opportunities identified for using desalinated water as a source of water supply for the City.

Recycled Water Opportunities
The City does not currently use and has no plans to use recycled water in the near future; however, the City’s treated wastewater discharges to ponds that percolate into the subsurface and recharge the groundwater basin as return flows. These return flows and recharge to the groundwater basin help protect against seawater intrusion and improve groundwater quality by lowering total dissolved solids (“TDS”) concentrations.

The Santa Barbara County Board of Supervisors directed that the County Water Agency study local water supply options available currently and into the future, including recycled water supplies. This project took approximately one year to complete and was received by the Board of Supervisors in December 2015. The City coordinated with the County Water Agency in this effort. An excerpt from the Santa Barbara County Long Term Water Supply Report containing Section 4.2 Regional Recycled Water is included as Appendix E.

6.7.1 Wastewater Quantity, Quality, and Current Uses
The City Utilities Department owns and operates the water system and the wastewater system for the City. No other local water, wastewater, groundwater, or planning agency operates within the City’s service area.

A per capita wastewater generation factor was calculated based on the volume of wastewater currently generated by the customers in the City’s wastewater system. The per capita wastewater generation for the City service area is approximately 68 GPD. This per capita wastewater generation factor was used to estimate projected volumes of wastewater collected and treated in the City, as shown in Table 6-8. The City does not currently supply recycled water to its customers. However, under the Stipulation, the City receives credit for the return flows of the water imported through the SWP.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-10
Table 6-8: Current and Projected Wastewater
Type of Wastewater 2020 2025 2030 2035 2040 2045
Projected population in
service area
107,353 116,907 122,402 127,901 133,410 135,411
Wastewater collected and
treated in service area
8,204 AF
(7.32mgd)
8,934 AF
(8.0 mgd)
9,354 AF
(8.4 mgd)
9,775 AF
(8.7 mgd)
10,195 AF
(9.1 mgd)
10,348 AF
(9.1 mgd)
Volume that meets
recycled water standard

N/A N/A N/A N/A N/A N/A
Currently, the City disposes of all of its treated wastewater through percolation ponds under its Waste Discharge Requirements permit. The City plans to continue with its current method of wastewater treatment, as it allows for the use of imported water return flows. As noted above, return flows help to protect the Basin from seawater intrusion and improve groundwater quality by lowering TDS concentrations.

6.7.2 Potential Use
There are no existing recycled water customers in the City’s system. No potential future recycled water uses have been identified within the City’s service area. Under the Stipulation, the City receives credit for the return flows of imported water into the Basin. This imported water is indirectly recycled, as the City pumps a portion of the imported water as return flows.

6.7.3 Optimization and Incentives for Recycled Water Use Because the City maximizes the use of return flows from imported water, there are no plans in place to provide traditional uses of recycled water. All of the City’s wastewater effluent percolates into the local groundwater table for natural reuse. No additional financial incentives are needed to encourage the use of recycled water, as local farmers already use groundwater wells to extract their groundwater supply, which, near the WWTP, is commingled with wastewater effluent that is percolated into the groundwater table. Therefore, optimizing and encouraging the use of recycled water is not applicable.

Climate Change Impacts to Water Supplies
The Santa Barbara County IRWMP (Dudek, 2019) quoted the County’s Long Term Supplemental Water Supply Alternatives Report (Long Term Supplemental Water Supply Alternatives Report, County of Santa Barbara, 2015), which stated that future water availability for some municipal suppliers will be reduced by lost reservoir capacity and reduced reliability of SWP deliveries. In addition, climate change effects such as extended periods of drought and more frequent occurrences as well as variance in the frequency and intensity of rain and storm events and the increased frequency and intensity of fires could all further limit water supplies locally and throughout the state. SWP deliveries are affected each year by weather conditions within the source areas and measures to protect habitat in key water transport facilities, particularly within the Sacramento/San Joaquin River Delta.

The IRWMP said that imported water supply from the SWP is projected to decrease by 7% to 10% by 2050, and 21% to 25% by 2100. Seawater inundation in coastal aquifers; increased evapotranspiration rates due to increased temperatures; changes in the amount, timing, and quality of runoff and recharge as precipitation patterns change; increased sedimentation to reservoirs due to increased wildfires; more extreme storm events; longer and more frequent droughts; and damage to infrastructure due to increased flooding and sea-level rise CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-11
all present significant risk to local water supply. Although these risks have not been quantified, they are widely recognized. These impacts could be reduced through various mitigation measures.

The IRWMP states that sea-level rise has the potential to impact water supplies in Santa Barbara County through seawater intrusion into coastal aquifers, impacts to water infrastructure, and decreased deliveries from the SWP. Seawater intrusion has not been known to occur in the Santa Maria Groundwater Basin but did occur in the Santa Barbara Groundwater Basin due to heavy pumping in the late 1970s, which was later reversed by effective pumping practices and groundwater injection.

The City will need to meet these potential reductions in SWP surface water supplies by improved water efficiency measures, additional groundwater recharge or a reduction in groundwater pumping in wet years to leave water in the aquifer for drier years.

Future Water Projects
The City will construct new wells, pipelines, and treatment systems as needed as part of ongoing operations to maintain supply and meet distribution system requirements. The City’s plan is to maximize supplies from the SWP to provide increased water quality, then to provide treatment to groundwater supplies to meet water quantity objectives during peak-use and during shortages in the SWP.

The City has a number of planned water supply projects and programs intended to increase use of the City’s water supply. Potential water supply projects and programs being pursued by the City include the following:
• The construction of a new municipal potable water supply well. • Reactivation of an existing municipal potable water supply well and connection to the City’s water supply infrastructure.
• As part of the Stipulation, the City, City of Guadalupe, and GSWC receive 80 percent of the Twitchell yield of 32,000 AF/YR. The balance of the water is made available to the stipulating landowners within the Santa Maria Valley Water Conservation District. The Stipulation allows the City to purchase this supply from stipulating landowners and could be used to increase the City’s availability of local groundwater supply.

Water Provided by Wholesale Agency
The City projected deliveries by CCWA, its wholesale water supplier for the SWP. Table 6-9 reflects the water use demands for the City from 2020 through 2045 from CCWA. These reflect what the City will request but actual average deliveries are expected to be lower. The City’s water supplies for the future period can be met with a combination of supplies previously identified.

The City will generally request enough SWP water to meet their demands minus 2,000 AF/year to keep their well field active. This volume will change as demands increase. The water available is expected to be about 59% of the contract amount based on the 2019 DWR Water Delivery Capability Report. However, the City will request and use more than the average 59% deliveries when feasible since other years will have limited or possibly no allocations. In addition, according to the Stipulation, the City must use at least 10,000 AF of SWP water, when available, to help preserve groundwater resources.

Appendix F includes a Reduced Delta Allocation discussion for the City of Santa Maria. Overall, on average, the City does not expect their SWP usage to increase over their historical usage, which has been 9,943 AF/year.

CHAPTER SIX: SYSTEM SUPPLIES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
6-12
Table 6-9: Retail Agency Demand Projections From Wholesale Suppliers Year
Wholesaler Contracted
volume (AF)
2020 2025 2030 2035 2040 2045
CCWA 16,200 11,976 13,000 15,200 15,900 16,200 16,200
Energy Consumption
Energy intensity is defined as the amount of energy used to collectively divert, store, convey, treat, and distribute each unit volume of water and herein is reported as kilowatt hours per acre-foot (kW-hr/AF). An analysis was performed for the reporting period of January 1, 2020 through December 31, 2020. The City of Santa Maria has two sources of water: groundwater from the Santa Maria Valley Groundwater Basin that is pumped using the City's six active wells and State Water Project water delivered via CCWA. The wells are able to pump and treat water as well as maintain pressure throughout the City’s distribution system. For this analysis, energy use for treatment and conveyance from CCWA is not included but can be found in the CCWA 2020 UWMP.

The energy intensity analysis is shown below in Table 6-10. The final calculated energy intensity is 400 kWh/AF. The City does not generate any electricity to offset its electricity use. Also, this analysis excludes energy used for treating and processing wastewater.

Table 6-10: Energy Intensity
Energy Intensity (Year 2020)
Description
Water Management Process
Extraction
/Convey (wells)
Treatment State Water Total
Utility
Volume of Water
Entering Process (AF)
7,492 7,492 5,615 13,106
Energy Consumed
(kWh)
5,217,236 28,693 0 5,245,929
Energy Intensity
(kWh/AF)
696.4 3.8 0 400.3
CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-1
Water Supply Reliability
Supply Reliability
The City has water supply available to meet projected demands. Groundwater, including the City’s prescriptive rights, Twitchell Yield, right to return flows of imported State Water as identified in the Judgement and Stipulation are pumped from the Basin and imported supplies from the SWP are obtained via CCWA.

The City’s supplies are derived both from local groundwater and the SWP. Each source can supplement or replace the other. As a result, the City’s supply is expected to be 100 percent reliable through 2045. This reliability is a result of the projected reliability of imported water and associated return flows and reliable groundwater in the Basin.

7.1.1 CCWA’s Water Supply Reliability
CCWA’s water supply is imported water from the SWP. The actual amount of water available to be delivered by the SWP varies from year to year based on a combination of hydrologic conditions, water available in SWP storage reservoirs, and environmental regulations in the San Francisco Bay/Sacramento-San Joaquin River Delta. SWP water deliveries are subject to reduction when dry conditions occur in northern California.

CCWA is a SWP contractor through Santa Barbara County Flood Control and Water Agency. Each contractor submits a request to DWR by October 1 of each year for water in the following calendar year, in an amount up to the contractor’s full allotment.

The 2019 SWP Delivery Reliability report concluded that the SWP, using existing facilities operated under current regulatory conditions, and with all contractors asking for their full, allotted amount, could deliver 59 percent of total allotted amounts on a long-term average basis (California Department of Water Resources, Natural Resources Agency, 2020). CCWA provided an evaluation of long-term SWP reliability for Santa Maria (see Appendix D). Their analysis projected that SWP deliveries during multiple-dry year periods would be about 25 percent (five-year drought) of the allotted amounts, as low as seven percent of the allotted amounts during an unusually dry single year. Climate change and sea level rise have both been taken into account in determining the future reliability of this water supply.

7.1.2 Reliability of Return Flows
The City derives its return flows to the local groundwater basin from groundwater recharge that is credited from a percentage of the amount of imported water delivered to the City each year. The available return flows are based on a five-year rolling average of the amount of SWP water imported by the City. The City may then pump 65 percent of the five-year average of imported water as return flows through their groundwater wells.

Under the Stipulation, the City is required to import a minimum of 10,000 AF/YR of SWP water, when available. Based on projected demands, the City plans to import the required water to meet this requirement from its full allotment of 16,200 AF/YR of SWP water. As mentioned previously, the return flow water will also be impacted by the reliability of SWP water delivered by CCWA. In normal years, return flows are expected to be about 59 percent reliable; however, during single-dry years and multiple-dry years, reliabilities are expected to be about 7-12 and 10-43 percent, respectively (Central Coast Water Authority, 2011).

7.1.3 Groundwater Supply Reliability
The Basin, especially the Santa Maria Valley Management Area, is a reliable source of water for the City. This reliability is based on the City’s water rights in the Basin. In addition, the Basin has a large volume of CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-2
groundwater in storage as a buffer to drought conditions, that has been demonstrated historically to occur from time to time. The groundwater storage is augmented by Twitchell Reservoir, which can store stormwater from larger storms that may be anticipated with climate change.

As a part of the Stipulation, the City, along with GSWC and City of Guadalupe, has preferential appropriative rights to surplus native groundwater. Therefore, these parties may pump groundwater without limitation unless a Severe Water Shortage Condition exists, as defined and provided in the Stipulation. The four conditions that serve as the basis for determination of the existence of a Severe Water Shortage Condition are described below.

In the event of a Severe Water Shortage Condition, the Court may order GSWC, along with Santa Maria and the City of Guadalupe, to limit their pumping to their respective shares of groundwater derived from the Twitchell Yield, return flows, and any assigned rights, such as the City’s 5,100 AF/YR of prescriptive rights in the Basin.

The Stipulation has requirements for monitoring and management to ensure that water supplies continue to be sufficient to support water uses in the Basin. Annual monitoring is completed to report on water demands and water supplies. The Stipulation includes provisions to avoid Severe Water Shortage Conditions and a procedure to address such conditions. Given the historic reliability of Basin supplies, Severe Water Shortage Conditions shall be found to exist only when the Management Area Engineer, based on ongoing monitoring, finds the following:

1. Groundwater levels in the Management Area are in a condition of chronic decline over a period of not less than five years;

2. The groundwater decline has not been caused by drought;

3. There has been material increase in groundwater use during the five-year period; and

4. Monitoring wells indicated that groundwater levels in the Santa Maria Valley Management Area are below the lowest recorded levels.

The procedure for addressing Severe Water Shortage Conditions is described in the Stipulation, which may include limitations on groundwater use. The Stipulation also has provisions for the management and administration of the Twitchell Project. These provisions are designed to provide for funding and operation of the Twitchell Project to maintain water supply to the Basin.

As noted, the City has rights to rely on its highest historical use of groundwater in times of surplus, plus 14,300 AF/YR of groundwater derived from the Twitchell Project, its SWP return flows, and its prescriptive rights.

7.1.4 City of Santa Maria’s Water Supply Reliability
Reliability for the City depends upon the reliability of imported water, groundwater production, and maintenance of the Twitchell Project, as discussed previously. The City’s total water supplies and demands are presented in Chapters 6 and 4, respectively. Comparison of water supply with water demand shows that sufficient water supply is available to meet projected demands. The excess supply available to meet demand serves as a buffer and increases reliability.

Table 7-1 presents water supply projections from State Water, groundwater, and return flows during a normal year, single-dry year, and multiple-dry years for the City for 2040 (note that 2020 values will differ). The normal year supply represents the expected supply under average hydrologic conditions, the dry year supply represents the expected supply under the single driest hydrologic year, and the multiple-dry year supply represents the expected supply during a period of five consecutive dry years.

Each scenario in Table 7-1 demonstrates that the City has adequate water supply reliability to meet demand in 2040.

CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-3
Table 7-1: Supply Reliability for the City of Santa Maria for Year 2040 Source Normal
Water Year
Single-Dry
Water Year
(1977)
Multiple-Dry Water Years (1930-1934)
Year 1 Year 2 Year 3 Year 4 Year 5
Imported
Water from
SWP
10,118 1,960 4,633 4,336 1,782 7,603 2,079
Twitchell
Yield(1) 14,300 14,300 14,300 14,300 14,300 14,300 14,300 Groundwater
(4) 5,100 5,100 5,100 5,100 5,100 5,100 5,100
Return flows
from SWP
water(2,3)
6,577 5,516 6,577 5,864 5,112 4,028 3,701
Total 36,095 26,876 30,610 29,600 26,294 31,031 25,180
Notes:

1. Granted under the Stipulation; subject to adjustments that could be ordered by the Court.

2. Return flows are based on five-year rolling average of imported water. Single-dry year impacts will not affect availability of return flows for previous five-year average.

3. Multiple-dry year reliability of return flows considers the previous five-year rolling average of SWP imports.

These projections assume five years of normal water years before the beginning of the multiple-dry year period.

4. Groundwater supplies are based on prescriptive rights in Santa Maria Groundwater Basin as defined in the Judgement. Pursuant to the Court’s Phase 5 Statement of Decision, the City has been assigned 5,100 AF/YR of prescriptive right.

Table 7-2 lists single-dry year and multiple-dry year periods for both groundwater and purchased water supplies.

The single-dry year and multiple-dry year periods are based on CCWA’s analysis6 of the lowest average precipitation for a single year and the lowest average precipitation for a consecutive multiple-year period, respectively.

Based on the historical records of SWP water and reliability data specific to Santa Barbara County, CCWA has indicated that 1977 is the single-dry year hydrologic period and the years of 1930 through 1934 are representative of hydrologic conditions for the driest five consecutive years. A normal water year is based on the long-term average basis. The historic hydrologic periods were used to model SWP availability in future dry year scenarios.
6 CCWA’s analysis is based on SWP’s analysis
CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-4
Table 7-2: Basis of Water Year Data
Water Year Type Base Year(s)
CCWA(1)
Normal Water Year N/A (2)
Single-Dry Water Year 1977
Multiple-Dry Water Years 1930-1934
Groundwater(3)
Normal Water Year(4) 1988
Single-Dry Water Year 1972
Multiple-Dry Water Years 1970 through 1972
Notes:

1. Delivery reliability data provided by CCWA.

2. N/A = Not Applicable. Average of the entire hydrologic period.

3. Record of precipitation from Western Regional Climate Center at Santa Maria, California.

4. Normal water year calculated from median precipitation from water year 1949 through water year 2010.

CCWA has determined it can meet projected water demands for imported water for these years, so the 100 percent reliable supply is equal to the projected demands. In addition, other mechanisms could augment the reliability of supplies during a dry period. Additional water can be made available through the SWP system for the incremental cost of purchasing or exchanging the water from others in the SWP delivery system. For example, water may be available through transfers or exchanges with other State Water Contractors, purchases of water through DWR dry-year water purchase programs, short-term water transfers through DWR’s Turnback Pool programs, and groundwater recharge programs.

For the groundwater reliability analysis, precipitation data from 1949 through 2010 were reviewed. Data for the water year basis were obtained by the WRCC in Santa Maria, California. Precipitation data was evaluated from water year 1949 (October 1, 1948 through September 30, 1949) through water year 2010 (October 1, 2009 through September 30, 2010). The single driest water year was 1972 with 4.26-inches of precipitation. The normal water year was based on DWR’s description of the median water year over the period of record. The median annual precipitation between water year 1949 and water year 2010 was 12.07 inches. Based on the median precipitation, the normal water year was 1988. The multiple-dry year period of water year 1970 through water year 1972 recorded the lowest 3 -year total of precipitation.

The following sections present the current water sources: normal water year, single-dry year, multiple-dry year water supply, and demand assessments.

Normal Water Year Analysis
Table 7-3 summarizes the service reliability assessment for a normal water year based on water supply and water demand projections. The demands presented in Table 7-3 include projected water use within the City, sales to other agencies, and water loss. The supplies decrease slightly each year since the SWP is expected to gradually lose reliability over time. The City’s supplies exceed the amount needed to meet projected demands.

Chapter 6 provides details of available total water supplies.

CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-5
Table 7-3: Comparison of Projected Normal Year Supply (AF) and Demand for Normal Water Year (AF) 2020 2025 2030 2035 2040 2045
Water
Supply
Total
36,712 36,558 36,403 36,250 36,095 35,941
Water
Demand
Total
13,244 15,026 17,247 17,869 18,490 18,716
Single-Dry Year Analysis
The single-dry year reliable supplies for imported water delivered by CCWA may be significantly reduced to seven percent to twelve percent from 2020 through 2045. Any water demand that cannot be met with SWP water and associated return flows will be met by groundwater supplies.

Table 7-4 demonstrates the reliability of water supplies to meet projected annual water demands for the City in a single-dry year. The supplies slightly increase each year since the State believes dry year water will become slightly more reliable due to operation of the Delta. The single-dry year supplies will meet or exceed projected demands through 2045 because local groundwater supply will offset the deficit in imported water supply in a single-dry year.

Table 7-4: Comparison of Projected Supply (AF) and Demand for Single-Dry Year (AF) 2020 2025 2030 2035 2040 2045
Water Supply Total 26,265 26,419 26,571 26,724 26,876 27,029 Water Demand Total 13,244 15,026 17,247 17,869 18,490 18,716 Multiple-Dry Year Analysis
Table 7-5 presents the projected multiple-dry year water supply and demand assessment. As noted earlier, the multiple-dry year supplies from CCWA for imported water are about 100 percent reliable at 14 to 42 percent of available supplies from 2020 through 2045. Any water demands that cannot be met with the SWP water and associated return flows are expected to be met by groundwater supplies.

The multiple-dry year water supplies are less than the normal years; however, the projected total water supplies are much higher than the projected demands. A combination of groundwater and SWP water will meet projected water demands under multiple-dry years. Table 7-5 demonstrates that the water supplies are sufficient to meet the projected water demand for each multiple-dry year period because groundwater and SWP water can supply water reliably through 2045.

In summary, water supplies from local groundwater and purchased water exceed total future estimated water demands under normal, single-dry year, and multiple-dry years.

CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-6
Table 7-5: Comparison of Projected Supply and Demand for Multiple-Dry Years 2020 2025 2030 2035 2040 2045
First
year
Supply
totals 28,715 29,189 29,662 30,136 30,610 31,084
Demand
totals 13,244 15,026 17,247 17,869 18,490 18,716
Second
year
Supply
totals 30,220 29,605 28,989 28,374 27,758 27,143
Demand
totals 13,244 15,026 17,247 17,869 18,490 18,716
Third
year
Supply
totals 27,921 27,169 26,417 25,665 24,913 24,161
Demand
totals 13,244 15,026 17,247 17,869 18,490 18,716
Fourth
year
Supply
totals
30,131 30,126 30,121 30,116 30,111 30,106
Demand
totals
13,244 15,026 17,247 17,869 18,490 18,716
Fifth
year
Supply
totals 25,180 25,180 25,180 25,180 25,180 25,180
Demand
totals 26,073 25,735 25,396 25,058 24,720 24,382
NOTES: Units of volume in acre-feet
Drought Risk Assessment
A 5-year drought risk assessment is included in the DWR tables found in Appendix C. This assessment, however, is generally not applicable to Santa Maria since water supplies are sufficient even in a multiple year drought. In other words, in dry years, the City’s supply exceeds its demands. The City will impose water use restrictions due to a catastrophic emergency or other reasons as discussed in the Water Shortage Contingency Plan (Appendix H).

Resource Optimization
The City is committed to optimizing its available water resources, including groundwater, and implementing water conservation programs throughout its service area. In an effort to expand the breadth of offered programs, the City partners with wholesale suppliers, local retailers, and other agencies that support water conservation programs.

The City understands the importance of water conservation for California’s future. The City’s water conservation programs, in effect at all times, include the following:
• Irrigation System. The City Recreation and Parks Department initiated a program to improve the efficiency of irrigation programs of the City’s landscaped areas. Under this program, the CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-7
irrigation system is regularly upgraded by replacing antiquated lines, heads, and valves. In addition, a state-of-the-art computerized control system is installed at many sites to improve irrigation efficiency. Furthermore, a self-guided garden tour offers a variety of plants suggested for planting to reduce irrigation water demand.
• Public Information Programs. The City practices a comprehensive public education program that has led to lower water usage.
• Residential and System Water Audit Program. A comprehensive water audit program increases conservation in the City. The residential program includes home water visits in which the City inspects residential plumbing fixtures and irrigation systems. The system audit program includes a thorough water meter inspection plan and a notice of high water use policy. • Fixed Base Meter Reading System. The City installed a fixed-base meter reading system on 100 percent of its system. This meter reading system reduces water demand by identifying customer leaks.
• Water Conservation Outreach. The City continues to work with the community to encourage water conservation on a voluntary basis. Water conservation activities include bus ads, water conservation kits, soil moisture meters, shower timers, toilet tank banks, and other promotional items.

The City’s water conservation programs are discussed in more detail in Chapter 9 – Demand Management Measures.

The City optimizes the use of its water supply through innovative actions that use water information systems to conserve and use water efficiently. Conservation and sensible water use helps to increase the reliability of City’s overall water portfolio.

7.6.1 Water Quality
The quality of the City’s water supply depends on the blending proportion of the SWP water with local groundwater. Both water supplies meet state and federal drinking water standards, providing the City with maximum flexibility in managing its water supply. The lower TDS concentration of the SWP water, when blended with the local groundwater, helps the City to meet its wastewater discharge requirements.

In general, groundwater represents about 25 percent of the City’s current water supply. The City met all State and Federal drinking water standards in 2019. (City of Santa Maria, 2019). In addition, the City does not anticipate any future water quality issues that may affect supply or reliability. Annually, the City publishes a Water Quality Report detailing the water quality sampling results for the City’s wells and SWP water. The City’s most recent water quality report is provided in Appendix F – Reduced Delta Reliance.

7.6.1.1 Surface Water Quality
The City purchases water from CCWA. CCWA obtains its water supply from the coastal branch of the SWP California Aqueduct. The source water of the SWP originates in northern California’s mountains, rivers, and streams, and flows through the Sacramento-San Joaquin Delta before entering the SWP California Aqueduct.

The coastal branch of the SWP consists of a 101-mile-long aqueduct from Kern County to Vandenberg Air Force Base in Santa Barbara County and a 42-mile long CCWA pipeline from Vandenberg AFB to Lake Cachuma. Water is pumped from the West Branch of the SWP through a series of five pumping stations and ultimately delivered to the Polonio Pass Water Treatment Plant where the water is treated by conventional surface water filtration techniques.

CHAPTER SEVEN: WATER SUPPLY RELIABILITY
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
7-8
The Polonio Pass Water Treatment Plant is located in the Cholame Hills at an elevation of approximately 1,400 feet. This elevation allows the plant to distribute water to the Santa Ynez Pumping Facility in Santa Barbara County, approximately 120 miles away. Typically, there is no additional treatment of the SWP water. The interconnection, through which Santa Maria accepts water from CCWA, is located downstream of Polonio Pass Water Treatment Plant and upstream of the Santa Ynez Pumping Plant.

The main water quality concerns for the SWP water from CCWA are related to the water supply source. The water quality is generally excellent; however, it is affected by seawater intrusion and agricultural drainage from peat soil islands in the Bay Delta area. The water quality parameters that are of particular importance include total organic carbon (“TOC”) and bromide. An increase in TOC and bromide concentrations may result in an increased production of disinfection byproducts. Chloramines are used at Polonio Pass Water Treatment Plant to mitigate any potential disinfectant byproduct issues.

7.6.1.2 Groundwater Quality
The City operates six active groundwater wells, which extract groundwater from the Santa Maria Valley Groundwater Basin. The City blends its local groundwater supplies with imported SWP water at its blending facility, reducing the overall hardness and mineral content.

Climate Change Impacts to Water Reliability
As discussed herein, the City has the following water sources available for urban water supplies:
• State Water Project (SWP) surface water supplies
• Groundwater from an adjudicated basin
A significant portion of the County is occupied by forest land, and wildfire is a common occurrence in the Region due primarily to the warm, dry climate. Longer and warmer seasons are likely to result in a low to moderate increase in fire risk according to the IRWMP. This could result in increased sedimentation to reservoirs, negatively impacting water quality, reducing storage capacity, and potentially reducing deliveries due to operational impacts.

Statewide, rainfall and snowfall are expected to change in terms of both type and timing, also as indicated by the IRWMP. The state has experience decreased snowpack in the Sierra Nevada, which has implications for SWP deliveries. DWR is predicting that the Sierra snowpack will experience a 25% to 40% reduction by 2050 based on historical modeling, with additional decreases caused by warmer storms due to climate change. At the local level, changes in the timing and intensity of precipitation could negatively affect groundwater recharge, runoff flowing to rivers and reservoirs, flooding frequency, and length of the dry season and resulting increased risk of wildfires and vegetation die off.

The Coastal Branch of the SWP delivers water originating in Northern California to water agencies in Santa Barbara County including the City of Santa Maria. The Sacramento–San Joaquin River Delta is the central hub of the SWP. Potential impacts to the Delta resulting from climate change include increased risk of levee failure, reduced water quality, and reduced water supply, all of which could significantly impact SWP operations, and the reliability of the supply of water delivered to the City. Sea-level rise threatens to disrupt deliveries from the SWP if saltwater advances into the Delta and increased quantities of fresh water would need to be released to protect water quality.

Impacts to SWP from climate change and sea level rise have both been taken into account in determining the future reliability and future allocations as presented in the 2019 SWP Delivery Capability Report (DWR, 2020).

CHAPTER EIGHT: WATER SHORTAGE CONTINGENCY PLANNING
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
8-1
Water Shortage Contingency Planning
The Urban Water Management Planning Act requires that the UWMP include an urban water shortage contingency analysis that addresses stages of action to be undertaken by the urban water supplier in response to water supply shortages, including more than a 50 percent reduction in water supply, and an outline of specific water supply conditions which are applicable to each stage. In addition to the stages of action, the City of Santa Maria is required to develop mandatory prohibitions against specific water use during shortages and consumption reduction methods in the most restrictive stages.

The City’s Water Shortage Contingency Plan (WSCP) is an independent document from the UWMP and can be found in Appendix H. The previous WSCP was prepared in 2011. The WSCP has been reorganized and expanded based on new State requirements. Some of the main topics covered in the updated WSCP include:
• Procedures for evaluating water supplies
• Criteria for declaring a water shortage
• Water shortage stages
• Shortage response actions
• Seismic risk and mitigation actions
• Community outreach
• Customer compliance and enforcement
• Revenue impacts
• Monitoring and reporting requirements
• Monitoring and evaluating the WSCP
The primary change from the 2011 WSCP was the expansion of Water Shortage Stages from four levels to six levels, which was required by the State.

CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-1
Demand Management Measures
Water Waste Prevention Ordinances
City Ordinances, Resolutions, and Municipal Code sections mentioned throughout this document may be found in Appendix I.

City Municipal Code §§ 8-10.32 on leaking facilities and 8-10.33 on outdoor water use restrictions state that water may be shut off and sealed by the City Utilities Department if a customer is found to be willfully and negligently wasting water through the misuse of sprinklers.

City Municipal Code § 9-4.10 Section 423 states that all commercial car wash facilities, including self-wash, shall have a water recycling system, and the design and installation of these systems shall be approved by the administrative authority.

On November 18, 2014, the City Council adopted Resolution 2014-131 to modify and enact Stage 1 of its Water Shortage Contingency Plan (Chapter 8). The resolution amended Stage 1 to prohibit outdoor irrigation of ornamental landscapes or turf with potable water from 12:00 p.m. to 4:00 p.m. and to consider such violations to be a “willfully negligent waste of water.” On May 19, 2015, the City Council adopted Resolution 2015-46 to further modify Stage 1 to prohibit the following acts and consider them a willfully negligent waste of water:

1. Application of potable water to outdoor landscapes during or within 48 hours of measurable rainfall;

2. Irrigation with potable water of ornamental turf on public street medians; and

3. Irrigation with potable water outside newly constructed homes or buildings not in accordance with emergency regulations or other requirements established by the Building Standards Commission and the Department of Housing and Community Development.

The updated Water Shortage Contingency Plan also includes this requirement during a Stage 1 water shortage.

Metering
The City has approximately 23,000 meters in service, all of which are on Advanced Metering Infrastructure (“AMI”). The City recently upgraded the AMI system by upgrading all registers to read in cubic feet (instead of older registers reading in hundred cubic feet) to detect leaks early by monitoring changes in the hourly meter reads. This information can be used for conservation measures such as tracking customer leaks or excess water usage. AMI can also be used to identify issues like meter tampering or water theft. This also helps customers by identifying areas of potential concern prior to receiving the water bill. City software highlights high water usage that results in the City conducting onsite leak detection and notification. Leaks in City equipment are fixed, and customers are advised of any leaks in their equipment and advised to procure a plumber. The implementation of near real-time meter reading has enhanced these efforts and assisted the City in maintaining water use reduction.

The City replaced approximately 6,900 meters between 2015 and 2021 and is budgeted to replace 10 percent of the meters annually.

CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-2
Conservation Pricing
The City has adopted conservation pricing, including using water rates developed to recover the cost of providing service and billing customers for metered water use. The City revised its water and sewer rates through a Proposition 218 election in 2019. The water rates include both a fixed monthly charge and a variable consumption unit charge, which is conservation pricing. The fixed monthly charge, determined by meter size, recovers fixed operation and maintenance costs while the variable consumption charge, determined by actual water use, is based on the cost of providing water service such as purchasing and managing water resources.

The variable General Use rate for most customers has three tiers (0-5 units, 5-15 units, and over 15 units, with each unit representing 100 cubic feet) while the variable Mobile Home Park rate has two tiers (0-5 units and 6 or more units). The fixed monthly meter charge and the variable water consumption charges have an approved annual increase on the first day of the year for 2020 through 2023.

Public Education and Outreach
Following are summaries of public information and school education programs on water conservation.

9.4.1 Public Information Programs
The City of Santa Maria maintains a robust water awareness and conservation program that includes year-round community outreach and complementary water conservation visits by a Water Conservation Specialist, outreach booths at community events, and weekly notifications to customers of suspected leaks using analytical data from the City’s AMI system.

To promote and encourage water conservation to a population of more than 100,000, the Utilities Department utilizes social media platforms (Facebook, Instagram, Twitter), a water conservation webpage as well as radio, television, and various print advertisements in English and Spanish, including newspaper ads and informational brochures, large billboards and prominent bus advertisements, geotargeted online advertisements, printed ads in a monthly catalogue sent to City residents, and advertising on online music applications. Promotional items such as water drop magnets, reusable water bottles, home water conservation kits, and recycled tote bags with conservation messaging, among others, are also used for outreach on water conservation.

The water conservation webpages (www.cityofsantamaria.org/waterconservation) were redesigned in 2020 to provide fresh and relevant information regarding water conservation. Subpages include: Meet the Staff, Home Water Visits, Water Conservation Tips, Education & Outreach, Water Awareness, Landscape, Rebates & Water Restrictions, and Links & Resources. The landing page is easy to navigate, and many subpages contain links to email or call the Water Conservation Specialist.

The Utilities Department also utilizes other creative advertising tools, including an aerial banner that is flown over large community events promoting “Don’t Waste a Drop”, and “Drippy the Drop” an adult-size water drop costume worn during the City’s annual holiday parade walking alongside the Utilities Department’s float entry. Most recently, Drippy the Drop has been used on social media (Facebook, Instagram, and Twitter) to call attention to various conservation-related messaging, including “Fix a Leak Week” and “Water Tip Wednesdays.”
The City annually participates in the Environmental Protection Agency Fix-a-Leak Week program in March. The City issues press releases and shares information on social media about home water visits and educates customers on water wasted due to residential leaks.

CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-3
Information about drought tolerant landscaping and Smart Irrigation Controllers are available on the City’s water conservation website. Free self-guided tours of demonstration gardens are also available at the Santa Maria Valley Sustainable Garden.

The City sponsors and participates in Green Gardener classes at Allan Hancock College in Santa Maria.

Each spring and fall interested professional landscapers and residents participate in a four-week Green Gardener class designed to teach green gardening and landscaping techniques. Topics covered include irrigation efficiency, green waste reduction, pest and fertilizer management, proper plant maintenance and other sustainable, water-saving landscaping topics.

An annual Lawn & Garden Workshop is held in partnership with Harvest Blend Compost providing information to residents about drought tolerant planting, composting, and water-saving irrigation techniques. Although the workshop was cancelled in 2020 due to COVID-19, once COVID-19 restrictions are lifted, the City intends to continue the Lawn & Garden Workshop.

In 2018, the City adjusted utility billing cycles to level out the billing periods to align closer to the number of days in calendar periods. The billing period changed from a varying 28-day or 35-day billing cycle to consistent 30-to-31-day billing cycles. Updating the billing periods provided consistency, making it easier for customers to read and understand their bills and monitor their water consumption patterns.

Planned outreach for water conservation include the Mayor of Santa Maria asking residents to take the national Mayor’s Water Challenge for water conservation. The City will continue water conservation collaboration in the regional Santa Barbara County Water Efficiency Program with 18 local water purveyors.

9.4.2 Education Programs
Educational presentations for K-6 students on water conservation are provided throughout the school year in the form of four unique presentations by the Water Conservation Specialist and educational activity books provided to students. Approximately 750 students are reached annually through 25 classes. The Green Gardener Program held twice a year in both English and Spanish is composed of 15 two-and-a-half-hour sessions of classroom and field time. Additionally, the Project WET® Teacher Education Program is provided educators at all levels with education on diverse water topics, enabling educators to teach objective, experiential, science-based water education.

Since 2010 (except in 2020 due to school closures because of COVID-19), the Utilities Department has sponsored an annual Water Awareness Poster Contest for 3rd grade students. Students compete by creating colorful posters symbolizing Water Awareness Month and explaining the importance of water conservation.

The winners are announced at a City Council meeting and receive prizes and public recognition. In addition to managing and promoting its own programs and activities (including installation of a drought-tolerant landscape as a demonstration site at its administration building and upcoming Showerhead Exchange Program for City residents), the Utilities Department also collaborates with other local water purveyors to coordinate water conservation efforts and co-fund projects and programs, including the “Green Gardener” certification course offered at the local community college.

9.4.3 Impacts of COVID-19 on Public Education and Outreach Planned public education and outreach was impacted by the COVID-19 pandemic in 2020. School closures announced to adhere to the State’s “Stay at Home” order resulted in the cancellation of the annual Water Awareness Poster Contest and cancellation of school education programs related to water conservation.

Residential home water visits to evaluate water consumption and opportunities for water conservation were also suspended. Outreach opportunities were severely impacted because the Utilities Department was unable CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-4
to participate in planned public events in 2020. Despite reduced public events due to COVID-19, the Water Conservation Specialist remained available to evaluate consumption using real-time water meter data and answered questions from residents and businesses regarding conservation. Resumption of regular activities is expected as soon as health and safety orders allow a return to normal operations.

Programs to Assess and Manage Distribution System
Real Loss
The City has implemented a number of programs to assess and manage distribution system loss. These include meter testing, meter replacements, metering construction water, tracking water used for street sweeping, firefighter training, fixing water main leaks, and sewer maintenance. These are useful in helping the City to annually track water loss. In addition to tracking water production and use to determine water loss, the City has been pro-active in preventing leaks by installing anodes on copper service lines to reduce corrosion and pinhole leaks. To date, over 4,700 anodes have been installed.

Potential water leaks on the customers’ side are identified through the City’s AMI software for meter readings.

Potential leaks are classified as flows that are continuous for three consecutive days. Customers are notified of the potential leak via one or more of the following methods: phone call, door tag, and/or postcard. Additionally, a telephone hotline and email are established to allow customers to report water misuse or leaks, to request more information, or to schedule a free home water conservation visit. Customers can report wasteful watering anonymously. Hotline: (805) 925-0951 ext. 2801, Email: [email protected].

Water Conservation Program and Staffing Support
The City’s water conservation program is supported by one full-time employee:

Myra Ritchie, Water Conservation Specialist
2065 East Main Street, Santa Maria, CA 93454
(805) 925-0951 ext. 7235, [email protected] The position, which has existed since 1998, supports the Utilities Department with outreach and compliance.

Their role enables the City to consistently provide the community’s most essential and basic water services.

Duties include:
▪ Develop water conservation curriculum, and research, develop, and update pertinent water conservation and water reclamation ordinances, standards, policies, and practices. ▪ Monitor program compliance with laws, rules, and regulations related to provision of water conservation and related services.
▪ Maintain awareness of new developments in the field of water conservation and incorporate new developments as appropriate into programs.
▪ Develop, implement, and promote City programs related to water conservation. ▪ Conduct inspections, including home and business water visits. ▪ Establish schedules and methods for providing water conservation programs, including implementing policies and procedures.
▪ Participate in the preparation and administration of the water conservation program budget. ▪ Promote and coordinate specific public activities within the water conservation program to include seminars and workshops, prepare program event and facility marketing materials, including news releases, flyers, and schedules of events.

CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-5
The Water Conservation Specialist has completed training on Water Conservation and Water Efficiency offered by the American Water Works Association and the California Rural Water Association, the California Urban Water Conservation Council (“CUWCC”), and Forester Network. The Water Conservation Specialist has also received training on landscape water-use efficiency from the Green Gardens Group and the Santa Barbara County Green Gardener Program. The Water Conservation Specialist is also an active member of the Santa Barbara County Regional Water Efficiency Program.

Other Demand Management Measures

9.7.1 Other Demand Management Measures

9.7.1.1 Water Survey Programs
The City has developed and implemented a targeting/marketing strategy for residential water use surveys, providing indoor and outdoor water surveys, which have resulted in reduced water consumption.

The Water Conservation Specialist works closely with other City staff in responding to potential water leaks and providing complimentary in-home water visits to residents and completes an average of 35 visits annually.

During these visits, indoor and outdoor water use is assessed.

9.7.1.2 Residential Plumbing Retrofit
The City utilizes City events for distributing low-flow devices and uses a City webpage and other media outlets to provide information on low-flow kits. Kits include an ultra-low-flow showerhead, sink aerator, kitchen swivel aerator, leak detection tablets, and a toilet tank bank. The City runs a month-long Showerhead Exchange Program in January to promote water conservation indoors for City residents. Residents are given the opportunity to receive new low flow rated Watersense® showerheads in exchange for their old showerheads (limited to two showerheads per household). The program was extremely successful, with 175 showerheads exchanged for water-saving units, and public demand for another program, which is being planned to coincide with Water Awareness Month in May 2021. For Earth Day 2021, the Department held a landscape irrigation promotion whereby City residents received up to three new, water-saving sprinkler heads to replace old, water-wasting units.

9.7.1.3 Conservation Programs for Commercial, Industrial, and Institutional Accounts The City partners with the Santa Barbara County Water Agency to offer rebate programs to residents to replace ultra-low flush toilets for all commercial, industrial, and institutional accounts.

9.7.1.4 High-Efficiency Washing Machine Rebate Program and Residential Ultra-Low Flush Toilet Replacement Program
Rebates for High-Efficiency Washing Machine and a ultra-low flush toilet replacement program are not available for residential customers. However, other free items that promote water conservation, such as shower timers, toilet tank banks, moisture meter probes, sink aerators, rain gauges, and hose timers are distributed at community events and educational presentations.

The City is unable to subsidize customer accounts because of Proposition 218 requirements and obligations.

However, the Utilities Department regularly monitors the State website at www.saveourwaterrebates.com for water conservation-related rebates available to all Californians. Rebates are available to City residents through Santa Barbara County (Water Wise Santa Barbara, www.waterwisesb.org/rebate).

CHAPTER NINE: DEMAND MANAGEMENT MEASURES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
9-6
California Urban Water Conservation Council
The California Urban Water Conservation Council (CUWCC) no longer exists; however, the City was a signatory to the Memorandum of Understanding Regarding Urban Water Conservation in California (“MOU”) administered by the CUWCC and filed BMPs while CUWWCC was active.

CHAPTER TEN: PLAN ADOPTION, SUBMITTAL, AND IMPLEMENTATION CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
10-1
Plan Adoption, Submittal, and
Implementation
Notice to Cities and Counties Regarding UWMP Review
The City initiated agency coordination by mailing letters to cities and counties within its service area, wholesale agencies, wastewater agencies, and agencies with which the City has emergency connections. The initial letters notified the agencies of the City’s intent to prepare its UWMP and requested input. Table 10-1lists the agencies contacted during the preparation of this UWMP.

Table 10-1: Coordination with Agencies
Coordinating Agencies
Participated in UWMP DevelopmentCommented on the DraftAttended Public MeetingsWas Contacted for Assistance County of Santa Barbara ✓
Central Coast Water Authority ✓ ✓
Golden State Water Company ✓
Laguna County Sanitation District ✓
City of Guadalupe ✓
Nipomo Community Services
District
✓
Santa Maria Valley Water
Conservation District
✓
San Luis Obispo County Flood
Control and Water Conservation
District
✓
Santa Barbara County Flood
Control District
✓
General Public ✓

10.1.1 Notification Requirement – 60 Days Prior to Review/Adoption Hearing The City notified all of the agencies listed in the table above that the City’s 2020 UWMP was being reviewed and updated. The notification was sent on April 13, 2021, more than 60 days prior to the public hearing held on June 15, 2021. Appendix J includes copies of these notifications.

CHAPTER TEN: PLAN ADOPTION, SUBMITTAL, AND IMPLEMENTATION CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
10-2
Plan Adoption, Submittal, and Implementation
For this update to the City’s UWMP, a public hearing was held on June 15, 2021 to allow the public an opportunity provide input on the UWMP before adoption by City Council. No comments were received on the UWMP.

Legal notices for the public hearing were published in local newspapers in accordance with Government Code § 6066. Copies of the draft UWMP were made available for public inspection at the City Clerk’s Office, the City Utilities Department, and on the City website.

The final UWMP, adopted by the City Council on June 15, 2021, will be submitted electronically to the DWR, the California State Library, and any city or county for which the City supplies water within 30 days of adoption.

Adopted copies of the final UWMP are available for review by the public at the City Utilities Department during regular business hours and may also be viewed or downloaded from the City website.

Appendix J contains supporting documentation that: (i) the City made the draft UWMP available for public inspection; (ii) the City published notice of the public hearing; and (iii) the City held the public hearing. Also included is a copy of the resolution adopting the 2020 UWMP. These documents satisfy the submittals required by regulation associated with the adoption, submittal, and the limitation of an UWMP.

The City is committed to the implementation of this UWMP as required by § 10643 of the Act. The City has implemented many Demand Management Measures to help meet their per capita water use goal.

CHAPTER ELEVEN: REFERENCES
CITY OF SANTA MARIA 2020 URBAN WATER MANAGEMENT PLAN
11-1
References
California Coastal Commission. (2004, March). Seawater Desalination and the California Coastal Act.Retrieved 2015, from http://www.cacoastkeeper.org/document/seawater-desalination-and-the-california-coastal-act.pdf California Department of Finance. (2015). Projections of Population and Births. Retrieved 2015, from http://www.dof.ca.gov California Department of Water Resources. (2004, February 27). California's Groundwater: Bulletin 118.Retrieved 2015, from http://www.water.ca.gov/groundwater/bulletin118/basindescriptions/3-12.pdf California Department of Water Resources. (2015, May). Disadvantaged Communities Mapping Tool. Retrieved 2016, from https://gis.water.ca.gov/app/dacs
California Department of Water Resources. (2016, March). 2015 Urban Water Management Plans Guidebook for Urban Water Suppliers - Final.Retrieved 2016, from
http://www.water.ca.gov/urbanwatermanagement/docs/2015/UWMP_Guidebook_Mar_2016_FINAL.pdf California Department of Water Resources. (2016, February). Methodologies for Calculating Baseline and Compliance Urban Per Capital Water Use.Retrieved 2015, from
http://www.water.ca.gov/urbanwatermanagement/docs/2015/Methodologies%20- %20February%202016%20FINAL.pdf
California Department of Water Resources, Natural Resources Agency. (2015, July). The State Water Project Final Delivery Capability Report 2015.Retrieved from https://msb.water.ca.gov/documents/86800/144575dd-0be1-4d2d-aeff-8d7a2a7b21e4 California Irrigation Management Information System. (2015). ETo Maps. Retrieved 2016, from http://www.cimis.water.ca.gov
California Urban Water Conservation Council. (2016, January 4). Memorandum of Understanding.Retrieved from http://www.cuwcc.org/Portals/0/Document%20Library/About%20Us/MOU/MOU%2001-04-2016.pdf Central Coast Water Authority. (2011, June). 2010 Urban Water Management Plan.Retrieved from http://www.water.ca.gov/urbanwatermanagement/2010uwmps/Central%20Coast%20Water%20Authority/CC WA%202010%20Urban%20Water%20Management%20Plan.pdf
City of Santa Maria. (2013, May 7). City Council Agenda Archives.Retrieved from http://archive.cityofsantamaria.org/CouncilAgendas/2013/May_07/3K-a.pdf City of Santa Maria. (2015, June). 2014 Water Quality Report.Retrieved from http://www.cityofsantamaria.org/home/showdocument?id=296 Luhdorff & Scalmanini. (2014, April). 2014 Annual Report of Hydrogeologic Conditions, Water Requirements, Supplies and Disposition - Santa Maria Valley Management Area
Santa Barbara County Association of Governments. (2012, December). Regional Growth Forecast 2010-2040.Retrieved 2015, from http://www.sbcag.org/uploads/2/4/5/4/24540302/regional_growth_forecast_2010-2040.pdf United States Census Bureau. (2010). Quick Facts. Retrieved 2015, from http://www.census.gov/quickfacts United States Census Bureau. (2015). Fact Finder. Retrieved 2016, from http://factfinder.census.gov Western Regional Climate Center. (2016). Historical Data. Retrieved 2015, from http://www.wrcc.dri.edu VOLUME 5 / CHAPTER 1: WASTEWATER COLLECTION SYSTEM
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX C SANTA MARIA GENERAL PLAN -

ALTERNATIVES TECHNICAL

MEMORANDUM

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Introduction ........................................................................................................................................................................1 Role of Alternatives in the Planning Process ...............................................................................................................1 Key Factors Driving Alternatives ...................................................................................................................................12 Introduction to Land Use Alternatives........................................................................................................................18 Alternative A: Annexation...............................................................................................................................................27 Alternative B: City Infill ....................................................................................................................................................31 Alternative C: Hybrid .......................................................................................................................................................35 Growth Projections..........................................................................................................................................................39 Mobility Alternatives........................................................................................................................................................40 Public Realm Alternatives...............................................................................................................................................47 Appendix A: Mobility Alternatives Memorandum.....................................................................................................51 Appendix B: Public Realm Design Options ................................................................................................................52 Figure 1: Areas of Stability and Change ........................................................................................................................4 Figure 2: General Plan Land Use....................................................................................................................................7 Figure 3: Existing Land Use..............................................................................................................................................9 Figure 4: Alternative A Land Use Mix...........................................................................................................................29 Figure 5: Alternative A Land Use ..................................................................................................................................30 Figure 6: Alternative B Land Use Mix ..........................................................................................................................33 Figure 7: Alternative B Land Use ..................................................................................................................................34 Figure 8: Alternative C Land Use Mix ..........................................................................................................................37 Figure 9: Alternative C Land Use ..................................................................................................................................38 Figure 10: Cross Section of a Road Diet Concept.....................................................................................................42 Figure 11: Existing Typical Section for Secondary Arterial (Residential Street) .................................................44 Figure 12: Existing Typical Section for Secondary Arterial (Commercial Street) ...............................................44 Figure 13: Proposed Typical Section for Secondary Arterial (Parking-Protected Bike Lanes)........................44 Figure 14: Proposed Typical Section for Secondary Arterial (Buffered Bike Lanes and Parking)..................44 Figure 15: Existing Typical Section for Primary Arterial (Residential Street).......................................................45 Figure 16: Existing Typical Section for Primary Arterial (Commercial Street).....................................................45 Figure 17: Proposed Typical Section for Primary Arterial (Bicycle Lane with Raised Buffer)..........................45 Figure 18: Proposed Typical Section for Primary Arterial (Transit Only Lane) ...................................................46 Figure 19: Primary Arterial .............................................................................................................................................48 Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 20: Secondary Arterial........................................................................................................................................48 Figure 21: Toolkit..............................................................................................................................................................49 Table 1: General Plan Land Use .....................................................................................................................................8 Table 2: Existing Land Use.............................................................................................................................................10 Table 3: SBCAG Growth Projections............................................................................................................................15 Table 4: SBCAG Projected Jobs .....................................................................................................................................16 Table 5: Minimum Residential Growth to Plan for...................................................................................................18 Table 6: Commonalities Across Alternatives .............................................................................................................18 Table 7: Land Use Designations ...................................................................................................................................21 Table 8: Alternative A Land Use Mix ............................................................................................................................28 Table 9: Alternative B Land Use Mix............................................................................................................................32 Table 10: Alternative C Land Use Mix..........................................................................................................................36 Table 11: Projected New Dwelling Unit and Job Growth ........................................................................................39 Table 12: Projected Total Population, Dwelling Units, and Jobs............................................................................40 Table 13: Mobility Alternatives Comparison..............................................................................................................47 Alternatives Technical Memorandum
Alternatives Technical Memorandum
This Technical Memorandum is the deliverable for Task 4.4 of the General Plan Update scope of work and describes land use, mobility, and public realm Alternatives to address key issues identified so far in the Santa Maria General Plan Update process. The three land use Alternatives build off the areas of change identified as part of work undertaken per scope of work Task 4.2 as well as the working meeting held for Task 4.3 and Technical Advisory Committee input. The information summarized in this report will later be used to for community engagement that informs the selection of a preferred alternative (Task 4.8).

This Technical Memorandum first provides background information about Alternatives, including the role of Alternatives in the General Plan Update process, factors impacting Alternatives development, and growth the Alternatives must plan for. From there, the Technical Memorandum discusses the three land use Alternatives, including commonalities and differences between the Alternatives, land use designations, growth projections and the vision and direction of each Alternative. Mobility and public realm Alternatives are described in detail in Appendices A and B, respectively, but short synopses of these Alternatives are included in the body of the Technical Memorandum.

This Technical Memorandum will be followed by technical analysis on the Alternatives. This technical analysis, scoped as Tasks 4.5 and 4.7, will include an analysis of the fiscal impacts of the three land use Alternatives and an evaluation of the land supply and market demand of the three Alternatives, which is part of Task 4.4. The results of Task 4.6, the traffic analysis of land use Alternatives, is incorporated into Appendix A, the Mobility Alternatives Memorandum.

The City of Santa Maria is undertaking a multi-year effort to update its General Plan to establish strong and visionary policies that support economic development, sustainability, and improved quality of life in the city.

A General Plan is a policy document required by State law that provides long-range guidance for land use, development and other issues such as economic growth, open space, conservation, affordable housing, and employment. The General Plan also offers an opportunity for the community to engage in the planning process and to help define the long-term needs of residents, businesses, and employees.

The Santa Maria General Plan Update will cover topics that are important to the community including those mandated by State law. These include: Land Use and Community Design, Circulation and Mobility, Alternatives Technical Memorandum
Alternatives Technical Memorandum
Safety, Health and Environmental Justice, Conservation/Open Space, Noise, Public Facilities and Services, and Economic Development.

The General Plan Update has five major phases, which are designed as step-by-step building blocks (see the image below). The project is currently in the “Plan Alternatives” phase.

In 2020, during the Existing Conditions phase and to initiate the Listening + Visioning phase, City staff worked closely with the consultant team to systematically collect identify trends, issues, opportunities, and priorities, which are summarized in seven existing conditions reports (ECRs) that are available on the project website, www.ImagineSantaMaria.com.

Throughout the Listening + Visioning Stage, community members shared their vision for the future, qualities of Santa Maria to preserve, and issues to address. This engagement was conducted via nine Technical Advisory Committee meetings, three online surveys, one virtual community workshop, 17 stakeholder interviews, four community cafes conducted in partnership with Central Coast Alliance United for a Sustainable Economy (CAUSE), and meetings with City staff across departments. The City spread awareness of the General Plan Update in English and Spanish via a number of channels, including newsletter emails, utility bill mailers, communications with local non-profit organizations, social media posts, press releases, and updates to the project website, www.ImagineSantaMaria.com. Full results from community engagement, presented in engagement summary reports, can be found on the resources page of the project website, ImagineSantaMaria.com.

Using a systematic process of reviewing all the key findings from the Existing Conditions Reports and community input from the Listening + Visioning Stage, the planning team produced the Vision, Guiding Principles, and Areas of Change and Stability document, which was approved by City Council in April 2021. Specifically, for each General Plan topic (e.g., land use, mobility, hazards, environmental justice, etc.) and for each area of the city, qualities to preserve, opportunities to capitalize on, challenges to address, and changes to advance were organized. From there, key themes were summarized to prepare a concise Vision Statement, to develop topic-specific Guiding Principles, and to identify Areas of Change and Stability by neighborhood and corridor. The Vision, Guiding Principles, and Areas of Change and Stability discuss topics central to Santa Maria, including agricultural identity; culture, history, and art; Alternatives Technical Memorandum
Alternatives Technical Memorandum
community design; community health; natural environment and resilience; housing quality and choice; resilient economy; connected growth; transportation innovations; infrastructure, utilities, facilities, and services; and governance and engagement.

The Plan Alternatives stage builds off of the Vision, Guiding Principles, and Areas of Change and Stability document. The Areas of Change and Stability map identifies Areas of Stability, where limited physical changes are anticipated but improvements continue to be made, as well as areas of potential transformation, where transformational change is planned or should be considered. The Alternatives phase of the planning process focuses primarily on Areas of Potential Transformation. For Areas of Stability and Enhancement, the updated General Plan will incorporate strategies to preserve and enhance existing assets and address needed improvements. The Areas of Stability and Enhancement and Areas of Potential Transformation are shown in Figure 1.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 1: Areas of Stability and Change
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Alternatives identify different land use, mobility, and urban design options the City has to achieve the community’s Vision and implement the Guiding Principles. Land use Alternatives are the foundation.

The land use Alternatives are distinguished by where they propose changes in General Plan land use designations in different Areas of Change across the city. General Plan land use designations identify the intended future use of every parcel of land in the city. According to State law, land use designations must identify the allowed uses and the development intensity (measured in dwelling units per acre, floor area ratio (FAR) or jobs/residents per acre). Zoning districts must be consistent with the General Plan land use designations.

While land use designations provide for overall development intensity and allowed uses, they do not specify the form or character of the building. Different interpretations of the same density and FAR can result in buildings of very different character. To encourage similar interpretations of allowed FARs, other City regulations such as zoning height limits, building setbacks, or open space requirements are used to guide the form of buildings within a given FAR range.

It is important to note a few limitations of land use designations. Land use designations cannot require specific uses or tenants. This means that the General Plan cannot require the type of ownership of buildings (rental versus ownership, or specific tenants in buildings). For example, the General Plan cannot require or prohibit that specific parcels be used for affordable housing, senior housing, special-needs housing, or prohibit certain types of tenants in commercial spaces (such as chain stores). Further, land use designations do not identify specific locations for parks, schools, and public buildings.

The City’s existing General Plan Land Use Element (LUE) was adopted in 1970 and amended in 2011.

The LUE designates the proposed general distribution, general location, and extent of the uses of the land. The Land Use Classifications (designations) in the LUE provide for the distribution of varying uses as indicated on the Land Use Policy Map and specify the maximum density allowed per gross acre of land. Existing General Plan land use designations are mapped in Figure 2, and their acreages are shown in Table 1. The General Plan defers to the Zoning Ordinance to establish specific development standards, including minimum lot sizes. The existing LUE map and designations will be updated as part of this General Plan Update, though most parcels in the city are not likely to have significant changes to their designations, particularly those identified as Areas of Stability.

The existing General Plan land use map and designations are informed by existing LUE goals, which are as follows:

Goal L.U.1 - Community Character. Maintain and improve the existing character of the community as the industrial and commercial retail center for northern Santa Barbara County and southern San Luis Obispo County.

Goal L.U.2 - Urban Services. Provide all necessary urban services and facilities for present and future city residents, which include providing sufficient land for community facilities (i.e., fire station, police station, library, cultural center, and public transit).

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Goal L.U.3 - Urban Design. The City will promote quality urban design enhancing Santa Maria's character.

Goal L.U.4 - Industrial and Commercial Uses. New employment generating clean and low water demand industry and commercial uses will be encouraged to locate in Santa Maria, and activities of this type presently located in the city will be encouraged to remain.

Goal L.U.5 - Development Continuity. Discourage sprawl and "leapfrog" development.

Goal L.U.6a - Balance Growth. Accommodate new development, balancing social, environmental and economic considerations.

Goal L.U.6b - Preserve Agricultural Resources. Accommodate growth while making every effort to preserve agricultural resources in the surrounding region.

Goal L.U.6c - Urban/Agriculture Equilibrium. Achieve a balance between increased developments and the maintenance, management, and/or preservation of local resources.

Goal L.U.7 - Land Use Conflict Reduction. Reduce existing and potential land use conflicts.

Goal L.U.8 - Planning Coordination. Coordinate planning efforts both within the city and with other jurisdictions in the region.

Goal L.U.9 - Promote Adequate Housing Supply. The City will continue to promote an adequate supply of quality residential development within Santa Maria.

Goal L.U.10 - Promote High Quality Commercial and Industrial Development. Continue to promote quality commercial and industrial development in Santa Maria and encourage the upgrading and revitalization of the existing commercial and industrial areas.

Goal L.U.11 - Balance Land Use Supplies. The City will address the present imbalance between the land area designated for residential development and for those areas designated industrial and commercial development.

Goal L.U.12 - Water Supply. Participate in and implement programs and measures which effectively conserve water.

Existing land use refers to the way land is developed and currently being used in Santa Maria. Existing land use may differ from General Plan land use, which identifies intended future use of each parcel.

Existing land use is important to understand when developing land use Alternatives, particularly when considering existing uses of parcels surrounding areas where change is expected. Figure 3 and Table 2 show existing land use in Santa Maria.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 2: General Plan Land Use

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Table 1: General Plan Land Use

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 3: Existing Land Use

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Table 2: Existing Land Use

Alternatives Technical Memorandum
Alternatives Technical Memorandum
The Alternatives will be reviewed and evaluated by City staff, decision-makers, and the community. The purpose of the Alternatives evaluation is for the community and the City to assess trade-offs among the Alternatives and identify which Alternative (or combination of Alternatives) best fulfills the community’s Vision.

Objective metrics will be used to compare Alternative options for specific physical development and improvement, including the following:

Land use:

Land use mix
Acreage of greenfield development
Range of housing options and which types
Transportation:

Vehicle miles travelled per capita, household, and employees Level of service
Vehicle to capacity ratio
Environment:

Greenhouse gas impacts
Energy use
Development on agricultural land
Cultural resources
Hazards
Critical habitat
Noise
Impact on public services
Fiscal Impact:

City revenues
City expenses
Health and Environmental Justice:

Access to parks and open space
Access to healthy food
Access to transit
Access to retail
Air quality
The Alternatives and the results of the technical analysis will be presented to the community for review and evaluation. Following this step, the Alternatives and the results of engagement will be shared with the Planning Commission and City Council along with recommendations for a Preferred Alternative, Alternatives Technical Memorandum
Alternatives Technical Memorandum
which may be one of the three land use Alternatives or a combination of various components from two or more of the Alternatives. The City Council will approve the Preferred Alternative.

The Preferred Alternative will be evaluated relative to its impacts on infrastructure. If the Preferred Alternative includes annexation, the project team will conduct an Annexation Study to identify infrastructure and capital improvements needed to accommodate future growth in annexation areas.

This task will include a fiscal assessment, which will evaluate projected City revenues and expenses associated with land uses in annexation areas, as well as an evaluation of environmental features and constraints in the annexation area. This task will also include conversations with the Santa Barbara County Local Agency Formation Commission (LAFCO) to discuss annexation and determine the process of incorporation of the annexation area into City limits.

The following list of key factors was derived based on findings from existing conditions analysis, conversations with City staff, and review from the Technical Advisory Committee. This is not an exhaustive list of opportunities and constraints in the city, but instead a list of leading factors that shaped land use, mobility, and public realm Alternatives.

Downtown Santa Maria. Downtown is the most walkable part of the city, it has a diverse mix of land uses and housing types, and it has many of Santa Maria’s historic, civic, and cultural resources.

Implementation of the Downtown Specific Plan and the Downtown Multimodal Streetscape Plan could create opportunities for job and population growth and transformational improvements to the roadways and public realm.

ADUs and JADUs. ADU and JADUs are currently allowed in Santa Maria per State law and may be able to accommodate projected housing growth in Santa Maria over the General Plan horizon.

Corridor Revitalization. Either the General Plan or an updated Entrada Specific Plan could include circulation, mobility, streetscape, built form, design components, and incentives for higher densities, intensification, and mixed-use redevelopment along the Main and Broadway Corridors, as recommended by the regional Sustainable Communities Strategies (RTP/SCS). The City has limited authority over the Main Street and Broadway rights-of-way because these corridors are owned by the State, but the General Plan Update may be an opportunity to determine if the City should seek to assume responsibility over these corridors from the State.

Vacant land. There is vacant and developable land that can accommodate new housing and/or employment growth over the General Plan horizon.

Opportunity sites. Many developed areas have low improvement ratios and/or a low FAR, indicating redevelopment opportunities.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Character and Design. Commercial and industrial places and streets generally have the greatest potential for improved mobility, enhanced character, and placemaking due to low-slung development and large areas devoted to surface parking. Residential places and streets are generally more stable, although opportunities do exist for public realm, streetscape, and connectivity improvements.

Improving Access to Amenities, Schools, and Services. Residents in most areas of the city do not have convenient walking access to schools, parks, food, and/or retail. The GPU may be an opportunity to introduce more walking and biking infrastructure to better connect people with amenities, and introduce commercial land uses near primarily residential areas to provide more access to amenities Annexation. Annexation of land outside of City boundaries may be an opportunity for growth.

Land Use Conflicts. Industrial uses are occasionally located next to residential uses, creating abrupt transitions. Residents living next to industrial facilities may be exposed to emissions, odors, noise, and other factors detrimental to public health. Land use conflicts should be avoided when designing Alternatives.

Disconnected Development. Some recent subdivision developments have created urbanized, primarily residential areas disconnected from the rest of the city and many of its amenities. Residents often have no choice but to drive to reach their destinations. Outward expansion of the city may create other residential areas disconnected from the rest of the city.

Infrastructure. The City of Santa Maria’s wastewater treatment plant, water system, and stormwater system require improvements. Historically some of these costs have been passed on to developers, which makes development more expensive. Per the Downtown Specific Plan EIR, buildout of the Downtown Santa Maria Specific Plan would result in 424,300 gallons per day in wastewater, which would exceed the capacity of existing sewer pipes. Growth of the city through 2045, both within and outside City limits, will continue to strain the city’s infrastructure.

Hazardous Sites. The siting of hazardous, clean up, and solid waste facilities near residential neighborhoods, particularly low-income communities, poses a serious threat in case of a hazard release emergency. In Santa Maria, there are five hazardous waste generators and one treatment, storage, and disposal facility (TSDF) that impact disadvantaged communities, given the concentration of these facilities to homes and the large generation of waste they produce.

Groundwater Threats. A concentration of oil and gas wells exists in the city, particularly south of Stowell Road. Oil companies are leading various remediation efforts of old sites. However, the City will need to consider how to address the impacts of idle and plugged oil well sites, including cleanup and the threat of potential leaks.

Changing nature of retail. The growth of e-commerce has reduced consumer demand for brick and mortar retail.

Post-pandemic impacts. The long-term effects of the COVID-19 pandemic are not clear. In the short term, it has caused trends, including remote work, changing housing and living preferences, growth of Alternatives Technical Memorandum
Alternatives Technical Memorandum
food delivery services and some online retail services, that should be considered when planning for Santa Maria long-term.

Airport Land Use Compatibility. The Santa Maria Public Airport is located in the southwestern corner of Santa Maria. Land uses adjacent to the Airport may be exposed to hazards related to landing and approach zones, airplane accidents, and noise.

Biological Resources. The city is home to plant and animal species, particularly along the Santa Maria River, near the Santa Maria Public Airport, Area 9 Specific Plan area, and areas that pond in agricultural areas, that are protected due to their status as a State or federal species of concern. Per the Airport Business Park Specific Plan, the Department of Fish and Wildlife has issued a biological opinion which outlines mitigation measures to reduce impacts to Federal and State listed sensitive species and endangered species including vernal pool fairy shrimp, California Tiger Salamander, and the California Redlegged Frog found on site.

Major Noise Sources. The Santa Maria Public Airport, Santa Maria Valley Railroad, agricultural and industrial operations, and roadway noise (e.g. U.S. 101 and major arterials) are the city’s predominant noise sources.

The Vision and Guiding Principles represent consensus from community engagement, a shared Vision of the future and a common understanding of the direction the City needs to follow to achieve the Vision.

However, the Vision and Guiding Principles do not address some important questions that will be answered during the process of evaluating Alternatives and presenting them to the community for feedback. Some of these questions include:

Should the City grow outward (via annexation), inward (via infill development), or via some sort of hybrid approach?
What is the desired mix of new housing types (e.g., single-family residential, multi-family residential, ADUs, etc.)?
To what extent should the City aim to preserve its agricultural economy, and to what extent should it plan to transfer agricultural land into land uses that create jobs in the healthcare, education, industrial, and office-based sectors?
How should the City balance roadway needs for all roadway users, including trucks, public transportation, pedestrians, private automobiles, and bicyclists? A critical component of Alternatives development is understanding how much housing and employment growth the Alternatives should plan for.

Though the General Plan horizon is 2045, this analysis anticipates growth needs through the year 2050 to align with Regional Housing Need Allocation (RHNA) cycles and growth projections produced by the Santa Barbara County Association of Governments (SBCAG).

Alternatives Technical Memorandum
Alternatives Technical Memorandum
This analysis was based on an understanding of how much housing and employment growth to plan for, which were projected based on potential RHNA allocations through the year 2050, SBCAG growth projections, as well as input from the Technical Advisory Committee (TAC), City staff, and the Department Advisory Group (DAG).

General Plan growth also takes into account growth the City has already planned, via Specific Plans and current pipeline projects. The net result, growth projections minus planned growth, yields housing and employment numbers the three land use Alternatives must at a minimum attain.

Per SBCAG’s final RHNA sixth cycle allocation, the City of Santa Maria’s zoning must allow the production of 5,418 housing units by 2031.

The General Plan horizon (2045) will cover the sixth, seventh, and most of the eighth RHNA cycle. As a conservative estimate, the General Plan should account for three times the 2023 – 2031 cycle allocation totals, or about 16,200 units.

Cycle 5, 2015 – 2023: 1,400 of 4,100 units permitted
Cycle 6, 2023 – 2031: 5,418 units allocated
Cycle 7, 2031 – 2039 cycle: Units to be determined
Cycle 8, 2039 – 2047 cycle: Units to be determined
Per Table 3, SBCAG projects a 33 percent increase in population in Santa Maria from 2020 through 2050. SBCAG does not project total number of housing units in the year 2050. However, assuming a housing vacancy of about 5 percent (consistent with vacancy rates in 2010 and 2020), based on the household projection of 44,100 in 2050, one can estimate a total of about 46,400 housing units are needed in Santa Maria in 2050 to accommodate the projected number of households.

With a total of about 30,400 units in 2020, a net increase of approximately 16,000 units are needed to house projected population growth by 2050. This is roughly consistent with the conservative estimate to accommodate three RHNA cycles, about 16,200 units. Therefore, the General Plan land use Alternatives should identify adequate sites to allow for the development of at least 16,000 housing units by 2045.

Table 3: SBCAG Growth Projections

1990 2000 2010 2020 2030 2050
Population 61,5524 77,4234 99,5534 107,4071 127,6003 143,1003 Households 19,9954 22,1464 26,9084 29,0181 36,4003 44,1003 Housing Units 21,2374 22,8474 28,2944 30,4301- -
Jobs - 33,9022 38,4892 44,0632 47,3103 52,5503
Jobs/Housing Balance - 1.48 1.36 1.45 - -
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Notes:

1. Source: California Department of Finance E-5 City/County Population and Housing Estimates, 1/1/20

2. Source: Longitudinal Employer-Household Dynamics (LEHD), 2010, 2017.

3. Source: SBCAG Regional Growth Forecast 2050 Santa Barbara County, 2019.

4. Source: California Department of Finance E-8 Historical Population and Housing Estimates for Cities, Counties, and the State, 1990, 2000, 2010.

5. Jobs in 1990 not available. Job totals in 2000 column are from the year 2002.

Regarding employment, SBCAG projects a total of 52,550 jobs in 2050, an increase in about 8,500 jobs over 2020 totals. Per the SBCAG’s 2050 job projections, as shown in Table 4, about 8% of SBCAG’s projected jobs in 2050 are in the industrial sector, 19% are in the commercial (retail) sector, 51% are in the commercial (office) sector, and about 22% are in the other/non-land use based sector, meaning they are not tied to a specific land use (such as construction). Using jobs-to-square foot conversion, this means Santa Maria needs about 14 million non-residential square feet total in 2050 to support this job growth.

However, feedback from the TAC and DAG indicated that a growth of 8,500 jobs by 2050 may not be enough new jobs to ensure a vibrant economy in Santa Maria, particularly when comparing this job growth to an increase in 16,200 housing units. 16,000 new jobs, which would result in a jobs-to-housing units balance of 1.2, was identified by the City as a more desirable amount of job growth. As of 2017, the balance was roughly 1.4 jobs per housing units. Therefore, the City should plan for a minimum of 8,500 new jobs, with 16,000 jobs being the desired total, by 2050.

Table 4: SBCAG Projected Jobs
Sector

Jobs
5 Approximate Building Square Footage6
Commercial (Retail)l
1 10,068 3,020,400
Commercial (Office)2 26,855 6,713,750
Industrial3 4,223 4,323,000
Other/Non-Land Use Based4 11,303 -
Total 52,550 14,057,150
Notes:

1. Commercial (retail) job sector includes retail trade; and leisure/hospitality sectors.

2. Commercial (office) job sector includes information; financial activities; professional and business services; education and health services; other services; and government sectors.

3. Industrial job sector includes manufacturing; wholesale trade; and transportation, warehousing, and utilities sectors.

4. Other/Non-Land Use Based job sector includes self-employed; natural resources/mining; and construction sectors.

5. Jobs source: SBCAG Regional Growth Forecast 2050 Santa Barbara County, 2019.

6. Square footage estimated based on the following job/Square Foot assumptions: 1 job per 1,000 industrial square feet; 1 job per 300 commercial/retail square feet, and 1 job per 250 office square feet.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
The land use Alternatives lay out a framework for accommodating 16,000 new housing units and a minimum of 8,500 new jobs. The City of Santa Maria already has a number of unbuilt projects in its pipeline, including 2,026 housing units and about 1.1 million square feet of non-residential development. Non-residential development could create an estimated 6,900 jobs, about half of SBCAG’s projected job growth by the year 2050 and over 100% of the target of 8,500 new jobs1 The City of Santa Maria has a number of Specific Plans that are planned but not built out. Some of the housing and job growth needed by 2050 can be accommodated in these Specific Plan areas, reducing the need to find adequate sites for housing and jobs elsewhere in the city. In total, there are an estimated 3,605 units and 16,200,000 non-residential square feet that can be built under current Specific Plans. The 16,200,000 planned non-residential square feet will enable the City to make significant progress to achieve at least 8,500 jobs by 2050.2 This square footage is comprised of projects in a variety of sectors, including office, industrial, and retail.

Growth of accessory dwelling units (ADUs) and junior accessory dwelling units (JADUs) need to be considered when planning for growth of Santa Maria. Whereas the land use Alternatives will identify vacant or redevelopable parcels where new housing can be built as part of larger developments, ADUs and JADUs represent incremental housing growth on parcels where housing already exists. Thus, ADUs and JADUs must be factored in the growth calculation formula because they represent housing growth that is expected to occur over the General Plan horizon, but ADU and JADU growth differs from planned growth over the General Plan horizon because it is difficult to predict exact parcels where this growth may occur.

From April 2018 through June 2021, 266 ADUS or JADUS were built in the City, for about 88 per year.

Based on an evaluation of ADU permitting history, about 1,300 units, or about 55 units per year, are estimated to be developed over the General Plan horizon. This decrease in permitting rates from recent totals is based on conversations with City staff and overall trends, developments per year due to the recent boom in ADU growth slowing and less applicable properties being able to develop ADUs over time.

Based on an understanding of projections from SBCAG, input from the TAC and DAG, and an analysis of RHNA allocations, the General Plan should plan to accommodate a minimum of 16,000 new housing units and 8,500 (ideally 16,000) new jobs through the year 2050.

However, with planned growth in the City via pipeline projects and Specific Plans, the City already has plans in place to accommodate some of the necessary job and housing growth. In total, about 4,700 1 Job totals calculated by Urban Footprint based on non-residential pipeline square footage. 2 To produce at least 8,500 jobs the 16,200,000 square feet of employment land uses would average about 1,900 square feet per employee. 1,900 square feet per employee is higher than most industry standards of square feet per employee, therefore, 16,200,000 should provide sufficient capacity for at least 8,500 jobs.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
housing units are anticipated to be built in the City in current pipeline projects or in Specific Plan areas.

Factoring in projected growth of ADUs and JADUs yields about 1,300 additional units. With a total of 1,100,000 non-residential square feet currently in the development pipeline and about 16,200,000 non-residential square feet planned in the City via Specific Plans, the City should be able to achieve the minimum of 8,500 jobs needed.

Thus, the land use Alternatives need to accommodate a minimum of 9,270 housing units (see Table 5).

The Alternatives do not need to accommodate a minimum number of jobs because pipeline and Specific Plan projects already plan for at least 8,500 jobs across a variety of job sectors. However, the Alternatives should still aim to ensure job diversity and achieve a net increase of close to 16,000 jobs to exceed SBCAG job projections and arrive at a jobs to housing ratio of 1.2.

Table 5: Minimum Residential Growth to Plan for

Units
Minimum growth to accommodate 16,200
Minus
Planned Growth 5,631
Pipeline Projects 2,026
Unbuilt Specific Plans 3,605
Minus
Projected ADU and JADU Growth 1,300
Equals
Remaining minimum growth to plan for 9,269
Three land use Alternatives were designed with a number of characteristics in common. These common characteristics are based on areas where there was consensus among the community; State and local laws; technical analysis; and the Vision and Guiding Principles document. These characteristics are described in Table 6.

Table 6: Commonalities Across Alternatives
Characteristic

Implementation in Alternatives and the General Plan
Consistency with Vision
and Guiding Principles
All Alternatives are consistent with the Vision and Guiding Principles. The General Plan will include policies and actions to complement the Vision and Guiding Principles, specifically, the components of the Vision and Guiding Principles not explicitly addressed in the land use and mobility Alternatives.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Future conditions may
differ from today
The Alternatives represent the best-possible guess to plan for a growing City in 2022, but there is no way to predict how conditions will change through 2050. Potential factors that may affect the viability of the General Plan in the future include changes to State law, the development approvals process, economic conditions, and more.

Same minimum growth
targets
All land use Alternatives will accommodate a minimum growth of 16,200 housing units and 8,500 jobs.

Specific Plan growth Most Specific Plans will continue to develop as anticipated.

Growth assumed in vacant
and opportunity sites
Growth within City limits for all three land use Alternatives is assumed to occur on sites that are currently vacant and sites that have opportunity for redevelopment.

Opportunity sites were selected based on feedback from City staff and via an analysis of building value to land value. Vacant and opportunity sites are assumed to redevelop in all three Alternatives.

Land use designations will
be the same in most parts
of the city
Most areas of the city will retain the existing General Plan land use designation across the three land use Alternatives.

General Plan land use
designations may change
for parcels where existing
land use differs from
General Plan land use
General Plan Land Use designations will be adjusted for selected parcels where existing or proposed land use necessitates a change in designation (for instance, a parcel used for residential that currently has a commercial designation may be changed to a residential designation).

Increase in infrastructure
capacity
Infrastructure capacity needs to be improved throughout the City. It is assumed that infrastructure capacity will be increased to accommodate the growth pattern laid out in the three land use Alternatives. As part of the technical analysis of the Preferred Plan, infrastructure improvement needs will be analyzed to ensure growth is adequately served by water, wastewater, and stormwater infrastructure.

Public facilities, parks, and
public services are needed
for a growing city
Expansion of public facilities, parks, and community services are assumed to serve the growing community.

Emphasis on “complete
neighborhoods”
All three land use Alternatives would aim to create more “complete neighborhoods,” where residents have convenient access to daily amenities, such as shopping, healthy food, and parks and public facilities.

Emphasis on addressing
health and environmental
justice
The Alternatives address SB 1000 requirements, including promoting physical activity in disadvantaged communities, promoting food access in disadvantaged communities, and promoting public facilities in disadvantaged communities, by improving access to parks and public spaces throughout the city and developing complete neighborhoods.

Policies in the General Plan will further prioritize improvements in disadvantaged neighborhoods.

The Alternatives differ from each other based on a number of characteristics. These characteristics, outlined below, lend to the creation of three distinct land use Alternatives and will enable the community and decision-makers to weigh trade-offs between the three Alternatives.

Annexation. Two of the three land use Alternatives assume annexation of land beyond current City limits.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Agricultural and open space preservation. The land use Alternatives will preserve different amounts of agricultural and open space land. For the two Alternatives that assume annexation, agricultural and open space land outside of City limits is assumed to be developed.

Development densities and intensities. The land use Alternatives assume different densities and intensities for new development in different parts of the City and beyond City limits.

Area 9 Specific Plan. The Area 9 Specific Plan is anticipated to develop as planned in one of the three land use Alternatives. The other Alternatives assume revisions to allow for residential growth.

Infrastructure. Infrastructure upgrades are needed in different locations in the City and outside City limits, depending on the land use Alternative.

Transportation. Transportation networks will need to be adapted to each land use Alternative.

Location of new public facilities, parks, and services. The provision of new public facilities, parks, and services will vary among the three land use Alternatives, based on where population growth is expected to occur.

In order to better meet the vision of the community, the updated General Plan will have new land use designations. Some will be similar to existing designations from the current General Plan and some designations will introduce new development opportunities. Land use designations are shown in Table

7. The land use designations are divided into five basic categories:

1. Residential designations for the residential-only areas of the city.

2. Mixed use designations to allow for a mix of uses in an area.

3. Commercial designations to provide areas for retail, offices and service uses.

4. Industrial/Airport designations to allow for a range of job-producing uses including light industrial, manufacturing, and airport operations.

5. Public and Open Space uses including schools, parks, open spaces, and agricultural uses

6. Planned Development for areas covered by the Downtown Specific Plan and planned annexation areas.

Per State law, General Plan land use regulations must be consistent with zoning. Currently, the zoning districts and General Plan designations are not consistent. Therefore, following the General Plan Update process, a comprehensive zoning code update may be necessary to ensure consistency.

State law requires that General Plan land use designations provide a measurement of the maximum development intensity allowed within each designation. According to State law, land use designations must identify the allowed uses and the development intensity (measured in dwelling units per acre, floor area ratio (FAR) or jobs/residents per acre).

Alternatives Technical Memorandum
Alternatives Technical Memorandum
The land use designations in the land use Alternatives make some changes to existing General Plan land use designations. These include the following changes:

Eliminate the Medium Density Residential -10 (MDR-10) General Plan land use designation and reassign all parcels currently with this designation to Medium Density Residential -12 (MDR 12) to allow up to 12 du/ac.

Revise the existing High Density Residential (HDR) designation to allow up to 30 du/ac in Alternative A and 35 du/ac in Alternatives B and C from 22 du/ac. This increase in du/ac allowance is consistent with State affordable housing law.

Create three new land use designations: Broadway Mixed Use (BMU), Main Mixed Use (MMU) for Alternatives B and C; and Planned Annexation Area (PA) for Alternatives A and C.

The existing Central District 1 designation has been superseded by the area in the Downtown Specific Plan. Rename the current Central District 2 designation to Central District.

Land use descriptions and uses have been lightly revised.

Zoning regulations must be within the range of the allowed intensity and uses found in the General Plan.

Although land use designations and zoning districts must be compatible, they are not necessarily identical; where the documents differ, the General Plan takes precedence. Unlike the General Plan land use designations, which are broad in scope, the zoning districts provide more specific guidance about allowed and prohibited uses (including conditional uses), as well as dimensional requirements such as building setbacks, parking standards, and building heights. Following the General Plan Update, updates to the Zoning Ordinance will be necessary to ensure compliance.

Two of the Alternatives assume annexation of land outside of City limits. This land is assigned a Planned Annexation Area land use designation. For these two Alternatives, a mix of land uses, density, and intensity have been prescribed, based on jobs and housing targets, community and City staff input, land use compatibility, and environmental constraints. Future specific or master planning efforts related to uses, building design, public facilities, transportation, and infrastructure is expected to occur in the future, following adoption of the General Plan Update.

Table 7: Land Use Designations
Designation Description
Residential
Residential Agricultural
(RA)
To create a transition area between agricultural and strictly urban uses, as well as provide for a particular residential lifestyle.

Allowed uses: Low-density dwelling units, noncommercial agricultural activities, the keeping of horses and certain commercial agricultural activities on larger (suggested minimum of 5- to 10-acre) parcels.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Density: Max 2 du/ac
Height maximum: 25 feet
Alternatives: All
Lower-Density
Residential (LWDR-4)
Single-family detached dwelling units with overall (average) density not to exceed four dwelling units per acre with variable lot sizes for single family detached units up to one acre in size.

Allowed uses: Single-family detached dwelling units with variable lot sizes for single family detached units up to one acre in size.

Density: Max 4 du/ac
Height maximum: 30 feet
Alternatives: All
Low Density Residential
(LDR-5)
To encourage new areas with overall densities responsive to the economic considerations of providing new housing, on a wide range of standard sized lots. providing the amenities and open spaces associated with traditional single-family areas and stabilizing existing areas by discouraging intensification of density.

Allowed uses: Single-family detached dwelling units with variable lot sizes for single-family detached units up to one-fourth acre in size.

Density: Max 5 du/ac
Height maximum: 30 feet
Alternatives: All
Low Medium Density
Residential (LMDR-8)
To encourage densities that are responsive to the economic considerations of providing affordable single-family housing on small lots while at the same time maintaining adequate individual private open space, design flexibility, and the character of a single-family neighborhood.

Allowed uses: Single-family detached dwelling units, with variable lot sizes for single-family detached units. This development type would usually require zero side yard development to maximize private, usable yards. Developments without zero side yards may require the larger lots and setbacks typically found in the R-1 zones.

Density: Max 8 du/ac
Height maximum: 30 feet
Alternatives: All
Medium Density
Residential (MDR-12)
To encourage new development while stabilizing existing development. Allows a mixture of unit types. while maintaining the feeling of a single-family neighborhood. To encourage reinvestment in older areas, and provide a land conservation measure by inducing development away from yet undeveloped areas.

Allowed uses: Single-family, detached and attached, duplexes; triplexes; and larger multi-family complexes.

Density: Max 12 du/ac
Height maximum: 30 feet
Alternatives: All
Note: The existing Medium Density Residential – 10 (MDR-10) designation would be eliminated and all parcels with this designation to would be reassigned to Medium Density Residential -12 (MDR-12).

High Density Residential
(HDR-35 in Alternatives B
and C, HDR-30 in
Alternative A)
To provide for an urban residential environment, preferably close to shopping facilities and existing activity centers, as well as provide an incentive for reinvestment in older established areas.

Allowed uses: Duplexes, triplexes, and larger multi-family complexes.

Density: Max 35 du/ac in Alternatives B and C (HDR-35), maximum 30 du/ac in Alternative A (HDR-30) Height maximum: 35 feet
Alternatives: All
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Note: The existing High Density Residential (HDR) designation would be revised to allow up to 30 du/ac in Alternative A and 35 du/ac in Alternatives B and C from 22 du/ac. This increase in du/ac allowance is consistent with State affordable housing law.

Mixed Use
Main Mixed Use (MMU) To allow for multi-story, multi-use development along Main Street contextual with adjacent residential uses. The intent is to allow for the creation of commercial uses mixed with multi-family housing to create opportunities to live on the Main Street corridor and encourage activity and vitality on Main Street. Uses may be mixed horizontally or vertically, though active ground floor uses, such as restaurants and retail, are encourage. A mix of uses is not required in this district. Design requirements, such as building stepbacks, may be employed to transition to residential uses on adjacent streets.

Allowed uses: Retail, restaurants, service commercial (such as banks or real estate offices), service establishments (such as medical clinics and beauty shops), office buildings, hotels, multi-family housing, townhomes, duplexes.

Density: up to 70 du/ac in Alternative B and 35 du/ac in Alternative C.

Assumed intensity: 1.1 FAR in Alternative B and 1.6 FAR in Alternative B, inclusive of residential and non-residential uses.

Height maximum: 70 feet
Alternatives: B and C
Note: This is a new land use designation.

Broadway Mixed Use
(BMU)
To allow for multi-story, multi-use development along Broadway. The intent is to allow for the creation of commercial uses mixed with multi-family housing to create opportunities to live on the Broadway corridor and encourage activity and vitality Downtown. Uses may be mixed horizontally or vertically, though active ground floor uses, such as restaurants and retail, are encouraged on the ground floor. A mix of uses is not required in this district.

Allowed uses: Retail, restaurants, entertainment, bars, service commercial (such as banks or real estate offices), service establishments (such as medical clinics and beauty shops), office buildings, hotels, multi-family housing.

Density: Up to 70 du/ac in Alternative B and 35 du/ac in Alternative C.

Assumed intensity: 1.1 FAR in Alternative B and 1.6 FAR in Alternative C, inclusive of residential and non-residential uses.

Height maximum: 70 feet
Alternatives: B and C
Note: This is a new land use designation.

Central District (CD) To encourage pedestrian activities and amenities while revitalizing the Downtown core. A variety of mixed uses within multi-storied buildings with residences and office uses located on the upper floors and retail uses located on the first floor. An enhanced street environment would create a pleasant walking environment.

Allowed uses: Mixed Uses (residential, office, retail), services, and assembly. Residential densities would include a maximum of 40 dwelling units per acre.

Density: 40 du/ac
Assumed intensity: 0.5 FAR, or 3.0 FAR with residential Height maximum: 40 feet
Alternatives: All
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Note: The existing Central District 1 designation has been superseded by the area in the Downtown Specific Plan. The existing Central District 2 designation has been renamed to “Central District.” Commercial
Community Commercial
(CC)
To include the majority of retail uses outside the central core, particularly along the lineal development corridors which have emerged. The majority of these uses would be geared to the area-wide market.

Allowed uses: Variety of retail uses, excluding "heavy", land extensive or quasi-industrial commercial uses such as lumber yards, agricultural equipment yards, pipe supply works, etc.

Density: 30 du/ac in Alternative A with Mixed Use Overlay, 35 du/ac in Alternatives B and C with Mixed Use Overlay
Assumed intensity: 0.5 FAR, or 3.0 FAR with residential Height maximum: 70 feet
Alternatives: All
Commercial/
Professional Office (CPO)
To provide areas for offices, which may be compatible with a range of other uses.

Allowed uses: Office development for the following services: medical, legal, travel agencies, insurance, and real estate services, as well as a certain complementary commercial uses.

Density: 30 du/ac in Alternative A with Mixed Use Overlay, 35 du/ac in Alternatives B and C with Mixed Use Overlay
Assumed intensity: 0.35 FAR, 1.1 FAR with residential
Height maximum: 35 feet
Alternatives: All
Freeway Service (FS) To accommodate the needs of the traveling public along major transportation corridors.

Allowed uses: Motels, service stations, restaurants, and rest stops.

Height maximum: 40 feet
Assumed intensity: 0.25 FAR
Alternatives: All
Neighborhood
Commercial (NC)
To provide areas which offer convenience goods and services to local residents without disrupting the residential character of an area. These areas are intended to be small in size and not geared to providing a multitude of more specialized goods and services serving a community-wide or regional market.

Allowed uses: Supermarkets, convenience grocery stores, drug stores, laundromats, bakeries, shoe repair shops.

Density: 30 du/ac in Alternative A with Mixed Use Overlay, 35 du/ac in Alternatives B and C with Mixed Use Overlay
Assumed intensity: 0.3 FAR, 1.6 FAR with residential (Alternative A) and 1.1 FAR with residential (Alternatives B and C)
Height maximum: 30 feet
Alternatives: All
Industrial/Airport
Light Industrial (LI) To accommodate industrial uses which contain the process primarily within the building, do not generate negative environmental impacts, and which are most compatible with adjacent nonindustrial uses.

Allowed uses: Research facilities, light assembly plants, non-public-oriented-offices and industrial support offices, tractor sales and display when the property is adjacent to the freeway, and churches on a temporary basis.

Assumed intensity: 0.4 FAR
Height maximum: 35 feet
Alternatives: All
Alternatives Technical Memorandum
Alternatives Technical Memorandum
General Industrial (GI) To provide areas for all types of heavy industrial uses, but particularly those which need to be separated from other land uses because of the impacts associated with these activities, such as heavy truck traffic, noise, odor, or dust.

Allowed uses: Range of industrial uses, including heavy manufacturing, heavy trucking operations.

Assumed intensity: 0.5 FAR
Height maximum: 40 feet
Alternatives: All
Heavy Commercial/
Manufacturing (HCM)
To permit activities that manufacture and retail on the same site as well as other heavy commercial uses which may be land extensive, require transport of materials by heavy truck, require large loading and docking areas, and where the possibilities of heavy noise generation exist.

Allowed uses: Lumberyards, boat works, warehouses, building supply dealers, mobile home sales, farm equipment sales, equipment repair, and churches within an existing building.

Assumed intensity: 0.5 FAR
Height maximum: 40 feet
Alternatives: All
Airport Service (AS) To provide a broad category facilitating the airport and airport-related commercial and industrial uses not adversely affected by airport operations, to provide for specific areas for aircraft operation and navigation aids, and to minimize the hazard to safe landing and take-off of aircraft.

Allowed uses: Full range of uses, including airport operation and support activities.

Assumed intensity: 0.6 FAR
Alternatives: All
Public and Open Space
Primary Agricultural
Open Space (AOS-1)
To preserve certain areas for present and future agricultural production. It also provides for limited residential uses.

Allowed uses: Intensive crop agricultural uses. All land classified as prime agricultural (Class I and II soils).

Alternatives: All
Secondary Agricultural
Open Space (AOS-2)
To preserve certain areas for present and future agricultural production. It also provides for limited residential uses.

Allowed uses: Less intensive agricultural uses, including grazing. Includes some lands that are not prime agricultural but are an agricultural buffer and are not now considered suitable for urban expansion.

Alternatives: All
Conservation Open
Space (COS)
To protect natural resources, provide scenic protection, act as an urban agriculture buffer, allow mineral extraction, and act as a safety buffer between the urban land uses and the levee. It also provides for limited residential uses.

Allowed uses: Includes areas subject to flood hazard, significant groundwater recharge areas, well farms, areas adjacent to creekbeds, areas of surface and sub-surface mineral extraction, levee buffer, airport safety areas, and publicly owned landscaped areas.

Alternatives: All
Recreational Open Space
(ROS)
To provide for recreation and scenic protection and provide scenic areas along railroad rights-of-way Alternatives Technical Memorandum
Alternatives Technical Memorandum
Allowed uses: Existing and proposed recreational facilities, including neighborhood, community, and regional parks; bikeways; equestrian trails; jogging paths; selected public utility and railroad rights-of-way and associated uses where the right-of-way corresponds to the adopted Bikeways Plan; and publicly owned and operated sanitary landfill operations that have the potential for reclamation and development into the aforementioned recreational facilities.

Alternatives: All
Community Facilities (CF) To provide for necessary facilities for use by the public.

Allowed uses: Public facilities, including schools and government buildings.

Height maximum: 35 feet
Alternatives: All
Planned Development
Downtown Specific Plan
(SP)
To encourage implementation of the Downtown Specific Plan.

Allowed uses: The Downtown Specific Plan designates all land uses, and the geographic boundaries of each use, allowed in its boundary.

Density: Up to 70 du/ac in Alternative A, 100 du/ac in Alternative B, and 70 du/ac in Alternative C.

Assumed intensity: 0.5, up to 3.0 FAR with residential.

Height maximum: 40 to 70 feet, depending on Specific Plan district.

Alternatives: All
Planned Annexation Area
(PA)
To encourage comprehensive planning and urban design flexibility for large annexation land areas (over 60 acres) through the adoption of a specific plan or master plans following the General Plan Update process, as the City proceeds with annexation. Such flexibility allows the City to adopt a set of land use specifications and implementation programs tailored to the unique characteristics of each area.

Allowed uses: The specific plan or master plan will designate all land uses, and the geographic boundaries of each use, allowed in each area. Potential uses include residential (single-family homes, townhomes, duplexes, multi-family), public and institutional, parks and recreation, and non-residential (industrial, office, retail, services, etc.) Assumed density: Up to about 10 du/ac. Note, maximum density will be defined in the General Plan.

Assumed intensity: Up to about 0.2 FAR. Note, maximum FAR will be defined in the General Plan.

Alternatives: A and C
Note: This is a new land use designation.

Notes:

1. Single-family zones are subject to SB9, which was passed in 2021. This law allows for parcels in single-family zones to be subdivided and duplexes built on each lot.

2. The maximum residential density of any residential land use designation may be exceeded to complement General Plan Housing Element policy (in accordance with the City’s inclusionary housing ordinance and density bonus provisions of Section 65915 of the California Government Code).

3. Intensities given in this Table represent assumed FARs used in Urban Footprint growth projections. These were based on average FARs of current development, as calculated by City staff. The City does not currently regulate intensity in its zoning or the General Plan.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
The vision for this Alternative is to continue the City’s existing pattern of growth within City limits, while annexing about 1,770 acres to accommodate new housing and employment growth. New residential neighborhoods outside City limits would be “complete neighborhoods,” where residents have easy access to parks, public facilities, and neighborhood commercial within an easy walk or bike. Employment growth in annexation areas would create a range of jobs, including those in the industrial, office, and retail sectors. The annexation scenario would create focus new employment uses near US-101 and near existing employment areas. New employment areas near Marian Regional Medical Center and Hancock College would create opportunity for expansion of these campuses, or co-location of complementary land uses, like medical offices, housing, and retail. New parks and public facilities would be primarily located in annexed land outside of City limits, where population is expected to grow most significantly.

The key drivers of this Alternative were identified based on community engagement and technical analysis. They are as follows:

The City has a history of growth by expanding outward, and this Alternative would continue the historical pattern of outward expansion.

The City cannot accommodate needed growth within City limits without significant changes to allowed building form (e.g., height, density). This Alternative would continue the existing scale and pattern of development within City limits.

This Alternative would differ from the land use pattern established in the existing General Plan, primarily by expanding City limits outward. Compared to the existing General Plan, this Alternative would:

Create a larger General Plan Planning Area by assuming annexation of land outside City limits. o To the east of City limits, the annexation area would be roughly bordered by Vineyard Trail Road to the south, US-101 to the west, Main Street to the north, and Rosemary Road to the east. The annexation area would also include land bordered by Main Street to the south, Panther Drive to the west, and the Santa Maria River to the north and east. o On the west side of the city, this Alternative would annex land to the north of City limits between E Street and Hanson Way for industrial use.

Create one new land use alternative: Planned Annexation Area (PA).

Revise the High Density Residential (HDR) designation to allow up to 30 du/ac.

The proposed land use mix of Alternative A: Annexation, is shown in Table 8 and Figure 4.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Table 8: Alternative A Land Use Mix

Designation
Acres Percent
Residential 4,142 27.1%
Lower-Density Residential (LWDR-4) 478 3.1%
Low-Density Residential (LDR-5) 2,098 13.7%
Low-Medium Density Residential (LMDR-8) 515 3.4%
Medium Density Residential (MDR-12) 530 3.4%
High Density Residential (HDR-30) 521 3.4%
Mixed Use 11 0.1%
Central District (CD) 11 0.1%
Commercial 1,116 7.3%
Community Commercial (CC) 784 5.1%
Commercial/Professional Office (CPO) 272 1.8%
Freeway Service (FS) 34 0.2%
Neighborhood Commercial (NC) 26 0.2%
Industrial/Airport 4,083 26.7%
Light Industrial (LI) 1,488 9.7%
General Industrial (GI) 409 2.7%
Heavy Commercial/Manufacturing (HCM) 709 4.6%
Airport Service (AS) 1,477 9.7%
Public and Open Space 3,904 25.6%
Primary Agricultural Open Space (AOS-1) 66 0.4%
Secondary Agricultural Open Space (AOS-2) 929 6.1%
Conservation Open Space (COS) 50 0.3%
Recreation Open Space (ROS) 1,638 10.7%
Community Facilities (CF) 1,221 8.0%
Planned Development 2.020 13.2%
Downtown Specific Plan (DSP) 197 1.3%
Planned Annexation Area (PAA) 1,823 11.9%
Total 15,275 100%
Note: Numbers may not add due to rounding.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 4: Alternative A Land Use Mix
Figure 5 shows the distribution of land uses for Alternative A: Annexation throughout the city.

27.1%

0.1%

7.3%

26.7%

25.6%

13.2%
Alternative A: Annexation
Residential Mixed Use Commercial
Industrial/Airport Public and Open Space Planned Development Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 5: Alternative A Land Use
Alternatives Technical Memorandum
Alternatives Technical Memorandum
This Alternative would accommodate new residential and job growth entirely within existing City limits.

Most growth would be focused along the Main Street and Broadway corridors and in the few remaining large vacant and opportunity sites throughout the city. This Alternative would assume revisions to the Area 9 Specific Plan, accommodating new housing growth, commercial, and industrial uses.

Transportation improvements would be focused within City limits, particularly along the Main Street and Broadway corridors, where most new growth is expected to occur. However, transportation improvements would also be needed to connect areas of major growth, such as Area 9, with the core of the city. Downtown would be a focal point of this Alternative, where more residential and employment growth would lead to more activity and vibrancy. Downtown would be complemented with new plazas, gathering spaces, and attention to urban design, while new parks and public facilities would be distributed throughout the city where growth is expected to occur and need exists.

The key drivers of this Alternative were identified based on community engagement and technical analysis. They are as follows:

This Alternative would be consistent with the pattern of growth assumed in SBCAG’s Regional Transportation Plan/Sustainable Communities Strategy, which proposes densifying the Main Street and Broadway corridors where high-frequency transit exists.

It is not guaranteed that the City will annex land, therefore, this Alternative would not require annexation.

This Alternative would prioritize infill development, and in doing so would preserve farmland and open space outside City limits.

This Alternative would create more opportunities for living, working, and gathering Downtown This Alternative would differ from the land use pattern established in the existing General Plan and existing Specific Plans. Compared to the existing General Plan and existing Specific Plans, this Alternative would:

Revise the High Density Residential (HDR) designation to allow up to 35 du/ac.

Require revisions to the Downtown Specific Plan, Entrada Specific Plan, and the Area 9 Specific Plan to allow new uses and development density/intensity.

Create two new land use designations, Broadway Mixed Use (BMU) and Main Mixed Use (MMU).

Require revision of the existing Mixed-Use Ordinance to allow up to 35 du/ac.

Revise the High Density Residential (HDR) designation to allow up to 35 du/ac.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
The proposed land use mix of Alternative B: City Infill, is shown in Table 9 and Figure 6.

Table 9: Alternative B Land Use Mix

Designation
Acres Percent
Residential 4,317 32.1%
Lower-Density Residential (LWDR-4) 590 4.4%
Low-Density Residential (LDR-5) 2,065 15.3%
Low-Medium Density Residential (LMDR-8) 515 3.8%
Medium Density Residential (MDR-12) 568 4.2%
High Density Residential (HDR-35) 579 4.3%
Mixed Use 484 3.6%
Main Street Mixed Use (MMU) 88 0.7%
Broadway Mixed Use (BMU) 385 2.9%
Central District (CD) 11 0.1%
Commercial 625 4.6%
Community Commercial (CC) 356 2.6%
Commercial/Professional Office (CPO) 207 1.5%
Freeway Service (FS) 36 0.3%
Neighborhood Commercial (NC) 26 0.2%
Industrial/Airport 4,007 29.8%
Light Industrial (LI) 1,474 11.0%
General Industrial (GI) 400 3.0%
Heavy Commercial/Manufacturing (HCM) 656 4.9%
Airport Service (AS) 1,477 11.0%
Public and Open Space 3,825 28.4%
Primary Agricultural Open Space (AOS-1) 66 0.5%
Secondary Agricultural Open Space (AOS-2) 850 6.3%
Conservation Open Space (COS) 50 0.4%
Recreation Open Space (ROS) 1,638 12.2%
Community Facilities (CF) 1,221 9.1%
Planned Development 197 1.5%
Downtown Specific Plan (DSP) 197 1.5%
Planned Annexation Area (PAA) 0 0%
Total 13,455 100%
Note: Numbers may not add due to rounding.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 6: Alternative B Land Use Mix
Figure 7 shows the distribution of land uses for Alternative B: City Infill throughout the city.

32.1%

3.6%

4.6%

29.8%

28.4%

1.5%
Alternative B: Infill
Residential Mixed Use Commercial
Industrial/Airport Public and Open Space Planned Development Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 7: Alternative B Land Use

Alternatives Technical Memorandum
Alternatives Technical Memorandum
This Alternative allows increased residential development density within City limits, including along Main Street and Broadway and on major opportunity sites. This Alternative assumes annexation, though not as much land would be annexed in this alternative (about 720 acres) as Alternative A: Annexation due to intensification of land uses within City limits. New residential neighborhoods outside City limits would be “complete neighborhoods,” where residents have easy access to parks, public facilities, and neighborhood commercial within an easy walk or bike. New parks and public facilities would complement new residential development outside City limits. Annexed land would be focused along US-101 and near Marian Regional Medical Center. Transportation improvements would simultaneously accommodate growth within City limits and in the annexation areas.

The key drivers of this Alternative were identified based on community engagement and technical analysis. They are as follows:

This Alternative would be consistent with the pattern of growth assumed in SBCAG’s Regional Transportation Plan/Sustainable Communities Strategy, which proposes densifying the Main Street and Broadway corridors, though less consistent than Alternative B: City Infill.

This Alternative would facilitate infill development, though less infill development than Alternative B: City Infill.

This Alternative would preserve more farmland and open space outside City limits than Alternative A: Annexation.

This Alternative would create more opportunities for living, working, and gathering Downtown.

The City has a history of growth by expanding outward, and this Alternative would continue the historical pattern of outward expansion.

This Alternative would slightly increase the existing scale and pattern of development within City limits.

This Alternative would differ from the land use pattern established in the existing General Plan and existing Specific Plans. Compared to the existing General Plan and existing Specific Plans, this Alternative would:

Create a larger General Plan Planning Area by assuming annexation of land outside City limits. o To the east of City limits, the annexation area would be roughly bordered by Vineyard Trail Road to the south, US-101 to the west, Main Street to the north, and Suey Road to the east.

The annexation area would also include land bordered by Jones Street to the south, Suey Road to the west, Main Street to the north, and Panther Drive to the east.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Require revisions to the Downtown Specific Plan, Entrada Specific Plan, and Area 9 Specific Plan to for allow new uses and development density/intensity.

Create three new land use designations, Broadway Mixed Use (BMU), Main Mixed Use (MMU), and Planned Annexation Area (PA).

Require revision of the existing Mixed Use Ordinance to allow up to 35 du/ac.

Revise the High Density Residential (HDR) designation to allow up to 35 du/ac.

The proposed land use mix of Alternative C: City Hybrid, is shown in Table 10 and Figure 8.

Table 10: Alternative C Land Use Mix

Designation
Acres Percent
Residential 4,185 29.5%
Lower-Density Residential (LWDR-4) 478 3.4%
Low-Density Residential (LDR-5) 2,084 14.7%
Low-Medium Density Residential (LMDR-8) 515 3.6%
Medium Density Residential (MDR-12) 543 3.8%
High Density Residential (HDR-35) 565 4.0%
Mixed Use 484 3.4%
Main Street Mixed Use (MMU) 88 0.6%
Broadway Mixed Use (BMU) 385 2.7%
Central District (CD) 11 0.1%
Commercial 634 4.4%
Community Commercial (CC) 356 2.5%
Commercial/Professional Office (CPO) 207 1.5%
Freeway Service (FS) 34 0.2%
Neighborhood Commercial (NC) 26 0.2%
Industrial/Airport 4,059 28.6%
Light Industrial (LI) 1,474 10.4%
General Industrial (GI) 409 2.9%
Heavy Commercial/Manufacturing (HCM) 699 4.9%
Airport Service (AS) 1,477 10.4%
Public and Open Space 3,904 27.5%
Primary Agricultural Open Space (AOS-1) 66 0.5%
Secondary Agricultural Open Space (AOS-2) 929 6.6%
Conservation Open Space (COS) 50 0.4%
Recreation Open Space (ROS) 1,638 11.6%
Community Facilities (CF) 1,221 8.6%
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Planned Development 197 6.5%
Downtown Specific Plan (DSP) 197 1.4%
Planned Annexation Area (PAA) 724 5.1%
Total 13,455 100%
Note: Numbers may not add due to rounding.

Figure 8: Alternative C Land Use Mix
Figure 9 shows the distribution of land uses for Alternative C: Hybrid throughout the city.

29.5%

3.4%

4.4%

28.6%

27.5%

6.5%
Alternative C: Hybrid
Residential Mixed Use Commercial
Industrial/Airport Public and Open Space Planned Development Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 9: Alternative C Land Use
Alternatives Technical Memorandum
Alternatives Technical Memorandum
This section summarizes growth projections of the three Alternatives. Per the “Total Growth to Plan For” section of this report, the Alternatives need to plan for at least 9,300 housing units on vacant and opportunity sites or in potential areas of annexation. The Alternatives do not need to accommodate a minimum number of jobs because pipeline and Specific Plan projects already plan for at least 8,500 jobs across a variety of job sectors.

As shown in the Table 11, all three Alternatives achieve the minimum desired dwelling unit totals. In Alternative A, about 70% of new dwelling units and 50% of new jobs developed in vacant and opportunity areas would be developed outside of City limits, while in Alternative C only about 40% of dwelling units and 20% of jobs would be developed outside of City limits. Alternative B has the lowest amount of job growth of the three Alternatives because vacant land and opportunity sites in the city were prioritized for housing development.

Table 11: Projected New Dwelling Unit and Job Growth
Target
Alternative A:

Annexation
Alternative B: City
Infill
Alternative C:

Hybrid
Dwelling Units
New growth projected1 9,300 9,770 10,010 9,690
Within City limits - 3,020 (31%) 10,010 (100%) 5,810 (60%) Outside City limits - 6,750 (69%) - 3,880 (40%)
Jobs
New growth projected1 - 14,580 8,720 15,830
Within City limits - 7,790 (53%) 8,720 (100%) 13,010 (82%) Outside City limits - 6,790 (47%) - 2,820 (18%)
Notes:

1. Growth totals for each Alternative do not include projected growth from pipeline projects, ADUs/JADUs, and Specific Plans, with the exception of the Area 9 Specific Plan in Alternative B and C, which assume the Area 9 Specific Plan will be revised to allow residential use and additional commercial uses.

2. Data source: Urban Footprint
Table 12 summarizes total population, dwelling units, and job totals of the three Alternatives by the year 2050. Even with annexation in Alternatives A and C, the vast majority of total population, dwelling units, and jobs would still be located within existing City limits.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Table 12: Projected Total Population, Dwelling Units, and Jobs

Base
(2022)1
Alternative A:

Annexation
Alternative B: City
Infill
Alternative C:

Hybrid
Population
Total population 108,600 142,680 144,420 141,480
Within City limits 108,600 126,920 (89%) 144,420 (100%) 132,500 (94%) Outside City limits - 15,760 (11%) - 8,980 (6%)
Dwelling Units
Total 28,200 44,420 45,660 44,340
Within City limits 28,200 37,670 (85%) 45,660 (100%) 40,460 (91%) Outside City limits 6,750 (15%) - 3,880 (9%)
Jobs
Total 43,050 65,540 59,680 66,800
Within City limits 58,750 (90%) 59,680 (100%) 63,980 (96%) Outside City limits 6,790 (10%) - 2,820 (4%)
Notes:

1. Source: Urban Footprint
This section highlights key findings from the attached Mobility Alternatives Technical Memorandum (see Appendix A). That memorandum describes the existing circulation system and how existing facilities can inform improvements associated with each of the three land use Alternatives. The memorandum also evaluates mobility improvements for the three Alternatives, such as closing gaps in multimodal networks for transit, pedestrian, and bicycle, regional traffic needs, and recommended polices.

Each of the three land use Alternatives were evaluated to understand the existing multimodal facilities and future needs.

All Alternatives would need further infrastructure, including the Broadway and Main Street corridors as transit priority corridors with exclusive red bus lanes, proposed pedestrian and bicycle improvements as identified in the adopted Active Transportation Plan (ATP), operational improvements at intersections, and capacity improvements on the eastern end of Betteravia Road, western end of Main Street and Betteravia Road, and northern end of US 101 in Santa Maria.

In general, Alternative A (Annexation) would need more infrastructure due to the lack of existing transportation facilities for vehicles, bicycles, and pedestrians. In addition, no transit services are provided in the areas that are not in the current city limits. However, after annexation, there will be opportunities to provide the proper infrastructure with the new construction and development.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
In Alternative A (Annexation) and Alternative C (Hybrid), transit services would need to be added to the annexed parcels. For Alternative B (Infill), most of the parcels are already being serviced by transit.

Regardless of which Alternative is selected as the preferred Alternative, transit and alternative transit mobility options would continue to be enhanced due to anticipated population and job growth.

There are several proposed bikeways, pedestrian facilities, and enhanced crossings from the ATP within City limits, but there are no improvements identified in the proposed areas of annexation in Alternatives A and C. If either of those land use Alternatives are slated to move forward, further evaluation of the bicycle and pedestrian network (and recommended accommodations) will need to be performed.

Since Main Street and Broadway are under the jurisdiction of Caltrans, there are limited proposed improvements along these corridors. More improvements are suggested on lower speed and volume roadways. These roadways provide a better level of comfort but are not always the most convenient.

When comparing the LOS between the three land use Alternatives for roadway segments with existing volumes, both the Annexation and Infill scenarios are similar. However, the Annexation scenario has better LOS for four more segments than Infill. For the locations with failing LOS, multimodal and emerging technology strategies can be analyzed to reduce the vehicular impact on the roadways.

Overall, Alternative A (Annexation) will have the least impact on existing roadways but will require new roadways with the land use change from agriculture to higher density land uses (residential, commercial, etc.).

Vehicle to Capacity Ratios (V/C Ratios) are a measure of effectiveness (MOE) in assessing vehicle congestion and delay. When a V/C ratio is 0.91 or higher, there will be unfavorable congestion and delay (level of service E or worse) with it failing once is greater than V/C ratio of 1 (amount of vehicles exceeds roadway capacity).

V/C ratios were used to compare the different land use Alternatives. Using the City’s traffic demand model, the current roadways in Santa Maria were compared. In general, the V/C Ratio is adequate at most city roadways with exceptions along US 101, SR 135, Main Street (SR 166), and Betteravia Road.

Out of the different land use Alternatives, Alternative A (Annex) has the best V/C Ratio along the western end of Betteravia Road and Alternative B (Infill) has the best V/C Ratio along the western end of Main Street (SR 166) and the majority of US 101 in the city.

Vehicle Miles Traveled (VMT) was assessed for all land use Alternatives. Per the results of this analysis, Alternative B (Infill) has the best VMT of the three Alternatives per capita and household (HH), particularly if transit and active transportation options within the city are improved upon. Alternative C Alternatives Technical Memorandum
Alternatives Technical Memorandum
(Hybrid) was developed by using the worst case of Alternative A (Annexation) and Alternative B (Infill).

Therefore, the VMT for this Alternative was the highest per capita and household.

However, in selecting a preferred land use Alternative it is important to compare the overall increase of VMT to the base. With the proposed three land uses having an imbalance between jobs and housing, there is a significant increase in VMT with every Alternative in comparison to the base scenario. It is recommended in the preferred Alternatives that the land use follow the current Sustainable Communities Strategy (SBCAG 2050 RTP) that only allows jobs or housing in the future if they can be balanced.

The low VMT generating scenario, such as Alternative B (Infill) generates more volumes in high-speed bins (speeds between 40 and 60 miles per hour). High VMT generating scenarios such as Alternative A (Annexation) and Alternative C (Hybrid) generate more volumes in low-speed bins.

The traffic needs from the base model and future (2050 SBCAG’s Regional Transportation Plan forecast) scenarios show that US 101 north of Santa Maria would benefit from widening. US 101 through the City of Santa Maria widens to three lanes in each direction but drops back down to two lanes in each direction around the San Luis Obispo County line. With the current push to reduce greenhouse gas emissions (GHGs), it is unlikely a widening project will occur so it will be important to identify alternative modes such as Bus Rapid Transit, commuter rail, or ride sharing services.

There were no distinguishable traffic differentiators to the three land use Alternatives in relation to the congestion on the roadways. Therefore, it is recommended that the City implement various transportation policies that guide and lead the transportation infrastructure and complement the various recommendations from the City’s existing plans.

Recommendation: Implement a road diet policy to reallocate space for alternative transportation modes Road diets can reallocate travel lanes to space for alternative modes of transportation (bicycle lanes, transit lanes, and bus turnouts). Most common applications include converting a four-lane roadway to a three-lane roadway with a two-way left turn lane (TWLTL). Figure 10 shows a road diet with adjacent parallel parking.

Figure 10: Cross Section of a Road Diet Concept
Road diets can also improve safety by reducing the vehicle conflict points for left-turning movements at intersections and driveways. On a four-lane divided road, left-turning traffic from the major street must Alternatives Technical Memorandum
Alternatives Technical Memorandum
store in the through lane before making the turn. In addition, vehicles turning left out of the minor street or driveway will have to cross additional lanes and have more conflict points. A road diet can reduce the travel lanes a vehicle must cross and provide a painted median storage (TWLTL) for a vehicle to make a two-stage crossing.

The Federal Highway Administration (FHWA) advises that roadways with ADT of 20,000 vehicles per day (vpd) or less may be good candidates for a road diet and should be evaluated for feasibility. With a road diet, it is important to evaluate the intersections along the corridor, as well as the segments, as they can act as the bottlenecks. Therefore, road diets should consider additional intersection operational improvements.

Several roadway segments were identified in the Existing Conditions report for potential road diets, including segments of Alvin Avenue, A Street, Battles Road, Black Road, Blosser Road, Bradley Road, College Drive, Cook Street, Depot Street, Donovan Road, E Street, Fesler Street, Mahoney Road, McCoy Lane, Main Street, Miller Street, Panther Drive, Santa Maria Way, Stowell Road, Suey Road, and Union Valley Parkway. The LOS was determined using existing and forecasted ADT volumes. The resulting LOS for each of the Alternatives are shown in Appendix A of the Technical Memorandum. For all but seven locations, the LOS was A for the existing and Alternative scenarios, keeping lane geometry the same.

The locations classified as four-lane, secondary arterials were further analyzed to evaluate the difference in LOS if the number of lanes reduced to two. The results from this analysis are displayed in Appendix A.

Out of the 30 locations analyzed, 8 locations have a failing LOS after reducing the number of lanes in future scenarios. Those locations that fail in 2050 should be evaluated during the growth of the city as currently the traffic volumes support a road diet.

Recommendation: Encourage a mode shift due to the increased impact of vehicles in the future scenarios. One strategy to reduce the vehicular impact on the roadways is installing increased multimodal infrastructure.

Currently, the City’s Standard Drawings for typical sections are provided by land use, including residential, commercial, and industrial. These standard drawings are similar in nature and have limited accommodations for alternate modes of travel, especially bicycles (see Figures 11, 12, 15 and 16 below).

Existing residential and commercial typical sections are identical, except for sidewalk and ROW width.

Proposed alternative typical sections are proposed for commercial and residential land uses to provide a better level of traffic stress for bicycles. Some proposed changes to accommodate these alternate modes are displayed in Figures 13, 14, and 17. These typical sections show what can be done to repurpose the outside lanes for bikeways. With many of the city roadways varying in width, it will be important to evaluate each roadway on a case-by-case basis with the traffic volumes and current cross sections.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 11: Existing Typical Section for Secondary Arterial (Residential Street) Figure 12: Existing Typical Section for Secondary Arterial (Commercial Street) Figure 13: Proposed Typical Section for Secondary Arterial (Parking-Protected Bike Lanes) Figure 14: Proposed Typical Section for Secondary Arterial (Buffered Bike Lanes and Parking)

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 15: Existing Typical Section for Primary Arterial (Residential Street)

Figure 16: Existing Typical Section for Primary Arterial (Commercial Street)

Figure 17: Proposed Typical Section for Primary Arterial (Bicycle Lane with Raised Buffer) Recommendation: Support and implement projects with emerging technologies for improved multimodal operations.

Emerging technologies can include converting the existing traffic signals with inductive loop detection to video detection for bicycle detection. In addition, with new controllers at the signalized locations, leading pedestrian intervals can be implemented in giving the pedestrians 5 seconds of time before the vehicles, to establish their right of way in the crosswalks.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Recommendation: Incorporate transit priority routes
Prioritizing alternative modes can reduce vehicle congestion and greenhouse gases in high-density land use areas that support transit priority routes such as Broadway. Figure 18 below shows an example of a typical section for a primary arterial that dedicates a travel lane to buses (red bus lane). This typical section will be especially important along the Broadway corridor in the Infill Alternatives where there is proposed much high land use densities and a major bus route.

Figure 18: Proposed Typical Section for Primary Arterial (Transit Only Lane) The memorandum’s key findings are summarized in matrix format in Table 13. Per the traffic model, with the anticipated growth in 2050 for any land use scenario, many roadways will reach or exceed capacity thresholds. Therefore, it is very important to provide alternative modes of transportation as a priority, which shifts vehicle traffic to transit, biking, or walkable trips. Therefore, a variety of mobility improvements are needed citywide regardless of future development patterns, including congestion mitigation on major roadways, implementation of the ATP, incorporation of new roadway sections and road diets, and planning for emerging technologies.

The Preferred Alternative should be designed to mitigate VMT impacts. If the Preferred Alternative involves annexation, the expansion of roadway, ATP, and transit networks will need to accompany annexation.

From the level-of-service analysis, several roadways in Santa Maria have opportunities for road diets based on the existing and forecasted future volumes. A road diet can allow bikeways to be added with minimal cost and provide connectivity in the transportation system. With the suggested new typical sections for the secondary arterial, evaluation of the current road cross section would need to be further assessed to see what could feasibly be accommodated. These roadways could still function as a secondary arterial versus a collector roadway but can have the additional lanes repurposed for alternative modes.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Table 13: Mobility Alternatives Comparison
Mobility Factor
Mobility Improvements for All
Land Use Alternatives
Mobility Alternatives
Alternative A:

Annexation
Alternative B:

Infill
Alternative C:

Hybrid
Vehicular Network Requires new
roadways
Requires new
roadways
LOS & Congestion Congestion mitigation
required on SR 135, Main
Street (SR 166), and Betteravia
LOS mitigation
required
VMT Jobs-housing balance,
alternative commute modes,
and CEQA VMT Threshold
compliance
VMT mitigation
required
VMT mitigation
required
Active
Transportation
Network
Implement ATP Network
expansion
required
Network
expansion
required
Road Sections
and Diets
Update roadway sections;
Implement road diet policy
Transit System New services
required
New services
required
Emerging
Technologies
Adopt appropriate
technologies
This section includes highlights from the Public Realm Design Options slide deck (see Appendix B). The updated General Plan will include design guidance to preserve community character, including how public realm and urban design tools are to be applied citywide and by subarea or neighborhood. The Public Realm Design Options can serve as the basis for the design guidance in the General Plan.

The slide deck introduces 16 tools for enhancing the public realm and urban design for both open spaces and streets in Santa Maria. For each tool, the slide deck describes the intent, applicability in Santa Maria, and which land use designations it is intended for. The slide deck also geographically illustrates where particular tools would apply in key areas of change, unique to each land use Alternative, and how tools can be applied on primary and secondary arterials.

The sections below in Figures 19 and 20 illustrate how toolkit items can be applied on primary and secondary arterials, like Broadway and Main Street respectively. These sections are identical to those proposed in the Mobility Alternatives section (see Figures 13, 14, and 17) but enhanced to show possibilities for public realm design.

Alternatives Technical Memorandum
Alternatives Technical Memorandum
Figure 19: Primary Arterial
Figure 20: Secondary Arterial
Alternatives Technical Memorandum
Alternatives Technical Memorandum
The matrix below (Figure 21) matches toolkit items with General Plan land use designations, which regulate land use, density, and intensity. When considering potential future land use Alternatives, the matrix can be used to identify how different public realm and urban design tools could be applied in different parts of the city. Note, some toolkit items may be recommended in the General Plan regardless of the land use Alternative. Community engagement is needed to confirm if these tools are appropriate for Santa Maria in the locations proposed.

Figure 21: Toolkit
The maps below show key areas of change for each land use Alternative. The toolkit items listed next to the maps are open space and street concepts that can apply to land use designations in these change areas. This comparison shows how public realm applications vary between the three land use Alternatives.

Alternatives Technical Memorandum
Alternatives Technical Memorandum

Alternative A: Annexation
Open Space Toolkit Items: Natural Open Space, Parks, Plazas, Trails
Street Toolkit Items: Street Trees, Landscape Strip, Curb Extensions, Gateways, Public Art
Alternative B: City Infill
Open Space Toolkit Items: Parks, Food Truck Pods, Trails, Pocket Parks, Plazas
Street Toolkit Items: Slow Streets, Alleyway Activation Sidewalk Widening, Landscape Strips, Curb Extensions, Parklets, Street Trees, Furnishings, Gateways, Public Art
Alternative C: Hybrid
Open Space Toolkit Items: Open Space, Parks, Food Truck Pods, Trails, Pocket Parks, Plazas
Street Toolkit Items: Slow Streets, Alleyway Activation, Sidewalk Widening, Landscape Strips, Curb Extensions, Parklets, Street Trees, Furnishings, Gateways, Public Art
Alternatives Technical Memorandum
Alternatives Technical Memorandum
Technical Memorandum
This Technical Memorandum is provided as an interim output under our agreement with Raimi + Associates. It is provided to foster discussion in relation to technical matters associated with the project and should not be relied upon in any way.

The Power of Commitment
11208620 1
September 13, 2022
To Ron Whitmore, PhD, AICP
Meghan McNulty, AICP
Project No. 11208620
Copy to Don Hubbard, TE, AICP
Billy Park, TE
From Kathryn Kleinschmidt, PE, PTOE
Emily Darke, EIT
Project Name Santa Maria General Plan Update
Subject Subtask 4.4 – Prepare Land Use, Transportation, and Policy Alternatives

1. Introduction
This technical memorandum will outline the existing circulation system including the multimodal network and how these facilities can inform improvements with the three land use alternatives. Those alternatives are as follows:

1. Alternative A – Annexation (Annex)

2. Alternative B – Infill

3. Alternative C – Hybrid
These alternatives are further described below. This memorandum will include evaluating improvements such as closing gaps in multimodal networks for transit, pedestrian, and bicycle, regional traffic needs, and recommended polices.

1.1 Alternative A (Annex)
Alternative A proposes annexing approximately 1,770 acres to accommodate new housing and employment growth. This alternative distributed new housing and employment throughout the City of Santa Maria with new areas annexed, east of US 101 (south and north of Main Street (SR 166)) and west of US 101 on Stowell Road. The areas identified for annexation are currently agricultural or vacant land uses with limited transportation facilities.

1.2 Alternative B (Infill)
Alternative B is described as city infill with large concentrations of housing and employment (mixed use) along Broadway (SR 135) and Main Street (SR 166). With a concentration of mixed-use land uses, there is more interaction between the different modes of travel such as walking, biking, taking transit, and driving with likely lower vehicle miles of travel. Therefore, this alternative is modeled to capture the mode splits between 11208620 2
transportation options and subsequent vehicle trip reductions due to this type of land use which encourages shorter trips which naturally lend to alternative modes such as walking, biking, and taking transit.

1.3 Alternative C (Hybrid)
Alternative C is a hybrid of Alternative A (annexation scenario) and Alternative B (infill scenario). This hybrid alternative distributes new housing and employment within the current city limits and in new areas of annexation, east of US 101 and south of Main Street (SR 166). The area that is identified to be annexed is currently agricultural land uses with limited transportation facilities.

2. Multimodal Traffic Assessment
Each of the three land use alternatives were evaluated to understand the existing multimodal facilities and future needs. In general, Alternative A would need more infrastructure due to the lack of existing transportation facilities for vehicles, bicycles, and pedestrians. In addition, no transit services are provided in the areas that are not in the current city limits. However, after annexation, there will be opportunities to provide the proper infrastructure with the new construction and development. It would be recommended the city have multimodal typical sections for the different classifications of roadways to include local, collector, and arterial roadways.

All alternatives would need further infrastructure, including the Broadway and Main Street corridors as transit priority corridors with exclusive red bus lanes, proposed pedestrian and bicycle improvements as identified in the adopted Active Transportation Plan (ATP), operational improvements at intersections, and capacity improvements on the eastern end of Betteravia Road, western end of Main Street and Betteravia Road, and northern end of US 101 in Santa Maria.

Recently, the city updated the Short-Range Transit Plan, August 2020 for Santa Maria Area Transit and 2020 Active Transportation Plan. Recommendations from these plans will be summarized below.

2.1 Transit Operations
The City of Santa Maria’s transit service is Santa Maria Regional Transit (SMRT), formerly known as Santa Maria Area Transit (SMAT). There are also a variety of regional transit services with transit stops in the city including Clean Air Express, Guadalupe Flyer, and Route 10 of the San Luis Obispo Regional Transit Authority (RTA) and intercity Breeze bus service to Lompoc (Route 100) and to Buelton/Solvang (Route 200). Clean Air Express offers weekday commuter bus from Northern Santa Barbara County to Goleta and Santa Barbara.

Guadalupe Flyer offers transit services between Guadalupe and Santa Maria. Route 10 of RTA serves Santa Maria, Nipomo, Arroyo Grande, Pismo Beach, and San Luis Obispo. These services could be expanded with improved performance in capturing the demand of commuters.

2.1.1 Short Range Transit Plan

2.1.1.1 Service Recommendations
The Short Range Transit Plan had several service recommendations for Santa Maria’s transit that include performance improvements, service enhancements, policy recommendations, and innovative/technology recommendations. These service recommendations are summarized below.

Performance Improvements
• Improve local service on-time performance
• Increase transit staffing by 1 FTE
• Develop and implement 18- to 24-month Marketing Plan
11208620 3
• Expand SMAT’s social media presence
• Refine Breeze schedule to better match capacity with demand • Reconfigure Route 8 to provide service to Walmart
• Formalize or discontinue interlining of Routes 3 and 4 • Consider revising the city’s service delivery approach to include geographic-based neighborhood shuttles in lieu of low-productivity fixed-route service • Limit evening service on Routes 5 and 6 to the Broadway corridor • Consider replacing evening service with Lyft/Uber subsidized rides.

Service Enhancements
• Increase school tripper capacity
• Consider assumption of the Guadalupe Transit service
• Ensure a proportional payment for SLORTA Route 10 operations • Increase peak-hour service
• Adjust service to incorporate the proposed Allan Hancock College transit hub Policy Recommendations
• Update and expand the city’s Bus Stop Improvement Plan • Develop a Bus Stop Placement Policy
Innovation/Technology Recommendations
• Evaluate cost-benefit of mobile fare payment options
• Secure funding to AVL technology
• Introduce predictive arrival technology
• Define path for transition to battery-electric fleet

2.1.1.2 Ridership and Access
The ridership throughout the city, along with local routes and stops, is captured in Figure 1. This information is from Santa Maria Area Transit (SMAT), which is currently known as Santa Maria Regional Transit (SMRT). 11208620 4
Figure 1 SMAT Local Routes and Stops with Ridership Percentages Figure 2 displays the local routes with quarter mile and half-mile radii. There is a gap in southern central area of the city, north of E Clark Avenue.
11208620 5
Figure 2 SMAT Quarter Mile Buffer

2.1.2 Land Use Alternatives
The transit stops within the city are displayed below, along with the different land use alternatives (see Figures 3, 4, and 5). In Alternative A (Annex) and Alternative C (Hybrid), transit services would need to be added to the annexed parcels. For Alternative B (Infill), most of the parcels are already being serviced by transit. 11208620 6
Figure 3 Transit Stops and Alternative A (Annex)
11208620 7
Figure 4 Transit Stops and Alternative B (Infill)
11208620 8
Figure 5 Transit Stops and Alternative C (Hybrid)
11208620 9

2.2 Pedestrian and Bicycle Operations

2.2.1 Active Transportation Plan
The 2020 Active Transportation Plan was adopted by City Council in January 2021. This planning level study replaced the 2009 Bikeway Master Plan and is a performance-based plan following the six principles from the Smart Mobility Framework: Location Efficiency, Reliable Mobility, Health and Safety, Environmental Stewardship, Social Equity, and Robust Economy.

Table 1 shows the breakdown of existing and proposed length of bikeways by bikeway classification from the ATP. The total existing and proposed miles of bikeway in the city is 169.3 miles.

Table 1 Existing and Proposed Miles of Bikeways
Some citywide projects were identified in the ATP. These include:
– Wayfinding programs,
– Bicycle parking,
– Bicycle detection at signalized intersections (accomplished with video detection), – Pedestrian scale lighting (supports safer walkways), and – Amenities (seating, shade, water fountains, and trash/recycling containers).

There were also suggested education and encouragement projects. Some of these projects are summarized below.

Education projects
– Streetsmarts campaign
– Bicycle safety education for adults
– Safe Routes to School
– Ticket diversion program
Encouragement Projects
– Bicycle and pedestrian coordinator
– Social walks/rides
– Adopt-a-Trail program
– Bike rack program
– Bicycle-friendly business program
11208620 10

2.2.2 Land Use Alternatives

2.2.2.1 Pedestrian Facilities
The proposed and existing pedestrian facilities are mapped, along with the three land use alternatives in Figures 6, 7, and 8. Many intersection crossing improvements are proposed, along with a Class I shared use path on Battles Road, the southern end of Broadway, and along the Santa Maria Valley Railroad Trail. In all the land use alternatives, there are not may existing or proposed pedestrian facilities. Pedestrian facilities will need to be added to service the modified parcels, especially for the annexed parcels in Alternatives A (Annex) and C (Hybrid).

2.2.2.2 Bicycle Facilities
The proposed and existing bicycle facilities are mapped, along with the three land use alternatives in Figures 9, 10, and 11. Bicycle facilities serve most of the parcels in the land use alternatives. However, the only bicycle facilities that service the annexed parcels Alternatives A (Annex) and C (Hybrid) are a proposed shared use path along the city border and a Class II bike lane along Betteravia Road. If either of these alternatives are chosen, bicycle facilities are recommended to service the annexed parcels.

2.2.2.3 Summary
There are several proposed bikeways. pedestrian facilities, and enhanced crossings from the ATP within the city limits but there are no improvements identified in the proposed areas of annexation in Alternatives A and C.

If either of those land use alternatives are slated to move forward, further evaluation of the bicycle and pedestrian network (and recommended accommodations) will need to be performed.

Since Main Street and Broadway are under the jurisdiction of Caltrans, there are limited proposed improvements along these corridors. More improvements are suggested on lower speed and volume roadways.

These roadways provide a better level of comfort but are not always the most convenient. 11208620 11
Figure 6 Existing and Proposed Pedestrian Facilities with Modified Parcels from Alternative A (Annex) 11208620 12
Figure 7 Existing and Proposed Pedestrian Facilities with Modified Parcels from Alternative B (Infill) 11208620 13
Figure 8 Existing and Proposed Pedestrian Facilities with Modified Parcels from Alternative C (Hybrid) 11208620 14
Figure 9 Existing and Bicycle Facilities with Modified Parcels from Alternative A (Annex) 11208620 15
Figure 10 Existing and Bicycle Facilities with Modified Parcels from Alternative B (Infill) 11208620 16
Figure 11 Existing and Bicycle Facilities with Modified Parcels from Alternative C (Hybrid) 11208620 17

2.3 Planned or Constructed Road Diets
After identifying existing and proposed bikeways in the ATP, the city started to evaluate what roadways where bikeways could easily be added with a pavement rehabilitation and/or restriping project. These roadways are captured below with the tentative timeline.

1. N. Blosser Road, Atlantic to Taylor
– Existing: Two lanes each direction
– In Construction: One lane each direction. Raised median with turn pockets at intersections/driveways.
– Impact: Reduces lanes for vehicles and speed management.

2. Depot Street, Stowell Road to Carmen Lane
– Existing: Two lanes each direction
– In Construction: Reduced to one lane each direction. Class IV bicycle facilities with on-street parking between Stowell and Battles. Buffered Class II facility between Battles and Carmen.

Striped median/two-way left turn lanes where appropriate. – Impact: Reduces lanes for vehicles and adds buffered bicycle lanes.

3. Alvin Avenue, Blosser Road to Railroad Avenue
– Existing: Two lanes each direction.
– In Construction: One lane each direction with two-way left turn lane. Maintain on-street parking with a Buffered Class II facility.
– Impact: Reduces lanes for vehicles and adds buffered bicycle lanes.

4. Pine Street, Main Street to Cook Street
– Existing: Two lanes each direction.
– In Construction: One lane each direction, add on-street parking and Class II facility.

The N. Blosser Road and Depot Street segments had existing roadway segment volume counts at select locations, which allowed for corresponding level of service (LOS) to be calculated. The conversion from a four-lane roadway to two-lane roadway at these locations resulted in minimal to no change in LOS. Overall, these roadways operated at an LOS of B or better for existing and all alternative scenarios.

2.4 Other Safety Recommendations
In providing overall safe and convenient accommodations for bicycle, pedestrian, and transit, it is important to understand that the lack of facilities coupled with higher speeds and higher volume roadways that create a less than desirable mode choice and have safety issues. A complete streets approach is recommended to provide these recommendations. These improvements can complement the needs with the roadway functional classification and have different intersection safety features that would improve access and remove barriers.

Arterial and Collector Roadways
– Wider sidewalks (6-10 feet) on both sides of the roadways and evaluate providing a sidepath (shared use path adjacent to roadway) where right of way allows
– Provide curb extensions where feasible in reducing the pedestrian’s crossing distance and exposure to vehicles
– Dedicated bike lanes and buffered or protected bike lanes were feasible – Green conflict markings for vehicle to bicycle mixing zones and evaluate providing a protected intersection – At signalized intersections provide leading pedestrian intervals and video detection for bicycle detection – Provide overall roadway geometrics (narrow lanes to support lower speeds overall speed management).

This will help to remove barriers such as discontinuous routes or treacherous crossings with multiple conflicts points with vehicles.
11208620 18
– Provide planter buffers with trees for visually narrowing the roadway and lowering speeds. – Enhanced lighting at the intersections, mid-block crossings, and along the corridor – Pedestrian crossing enhancements at frequented locations – RRFBs, pedestrian hybrid beacons, high visibility crosswalk, yield lines, etc. – Areas of gather and placemaking with benches, art, murals, and local flavor Local Roadways
– Traffic calming measures to keep speed low
– Limited striping and bicycle pavement markings for shared use (sharrows). – Dedicated bike lanes if feasible.
– Sidewalks and enhanced crossing treatments at major intersections and any attractions and destinations (schools, parks, churches, etc.)
As shown in the Figure 12 below, the pedestrian-to-vehicle and bicycle- to-vehicle collisions, were primarily concentrated in the downtown core along Broadway and Main Street. Both these roadways are state highways that serve various transportations modes including heavy vehicles/trucks. Evaluating the appropriate facilities in these areas is important with the proposed increased housing and employment densities with all alternatives.

Figure 12 Pedestrian and Bicycle Collision Density (2013-2017) 11208620 19

2.5 Emerging Mobility
Emerging mobility covers different transportation options such as such as micromobility, Transportation Network Companies, autonomous/connected vehicles, smartphone app services, and ride sharing services.

These options will affect the transportation network and future travel with less dependence on vehicle ownership. To date, the city doesn’t have any shared bike or scooter services, but this could be a likely possibility in the future.

Per the Short Range Transit Plan, the goal is to have 100% of bus purchases be for zero emission buses by 2029 with a 100% zero emission bus fleet by 2040. These improvements are also coupled with the following recommendations:
– First/last mile solutions to get riders to bus stops
– Examples: shared bike/scooter service, door-to-bus smartphone app, reservation-based/shared-ride transit service – Automatic Vehicle Location (AVL) and Predictive Arrival – Variety of programs available to add to buses to monitor on-time performance using geographic data and schedules/actual time at each stop (automatic vehicle location) – There are also programs for passengers to see real-time bus data (predictive arrival)

3. Vehicular Traffic Assessment

3.1 Traffic Operations per Land Use Alternatives

3.1.1 Level of Service (LOS) at Select Locations
When comparing the LOS between the three scenarios (Annex, Infill, and Hybrid) for roadway segments with existing volumes, both the Annex and Infill scenarios are similar. However, the Annex scenario has better LOS for four more segments than Infill. The LOS for the three alternatives is displayed for select roadway segments in Figures 13, 14, and 15.

To view LOS for all analyzed locations, along with the associated forecasted volumes, see Attachment 1. For the locations with failing LOS, multimodal and emerging technology strategies can be analyzed to reduce the vehicular impact on the roadways. Overall, Alternative A (Annex) will have the least impact on existing roadways but will require new roadways with the land use change from agriculture to higher density land uses (residential, commercial, etc.).
11208620 20
Figure 13 Level of Service for Land Use Alternative A (Annex) 11208620 21
Figure 14 Level of Service for Land Use Alternative B (Infill) 11208620 22
Figure 15 Level of Service for Land Use Alternative C (Hybrid) 11208620 23

3.1.2 Vehicle to Capacity Ratio
Vehicle to Capacity Ratios (V/C Ratios) are a measure of effectiveness (MOE) in assessing vehicle congestion and delay. When a V/C ratio is 0.91 or higher, there will be unfavorable congestion and delay (level of service E or worse) with it failing once is greater than V/C ratio of 1 (amount of vehicles exceeds roadway capacity).

Therefore, this was used to compare the different land use alternatives. Using the city’s traffic demand model, the current roadways in Santa Maria were compared. In general, the V/C Ratio is adequate at most city roadways with exceptions along US 101, SR 135, Main Street (SR 166), and Betteravia Road.

Mapped V/C Ratios for each land use alternative in the PM peak hour and daily volumes are included in Attachment 2. Out of the different land use alternatives, Alternative A (Annex) has the best V/C Ratio along the western end of Betteravia Road and Alternative B (Infill) has the best V/C Ratio along the western end of Main Street (SR 166) and the majority of US 101 in the city.

3.1.3 Vehicle Miles Traveled
Vehicle Miles Traveled (VMT) was assessed for all alternatives and is summarized in Table 2 below. Per the results of this analysis, Alternative B (Infill) has the best VMT of the three alternatives per capita and household (HH). Alternative C (Hybrid) was developed by using the worst case of Alternative A (Annex) and Alternative B (Infill). Therefore, the VMT for this alternative was the highest per capita and household. However, in selecting a preferred land use alternative it is important to compare the overall increase of VMT to the base. With the proposed three land uses having an imbalance between jobs and housing, there is a significant increase in VMT with every alternative in comparison to the base scenario. It is recommended in the preferred alternatives that the land use follow the current Sustainable Communities Strategy (SBCAG 2050 RTP) that only allows jobs or housing in the future if they can be balanced.

Table 2 VMT Summary per Alternative
Figure 16 shows the VMT by speed bin. The low VMT generating scenario, such as Alternative B (Infill) generates more volumes in high-speed bins (see speeds between 40 and 60 miles per hour (mph) in Figure 16). High VMT generating scenarios such as Alternative A (Annex) and Alternative C (Hybrid) generate more volumes in low-speed bins (see speeds between 0 and 35 mph in Figure 16). 2018 Base 2050 Annex 2050 Infill 2050 Hybrid
VMT/Capita 24.9 41.4 40.0 42.8
VMT/HH 75.2 116.9 112.2 120.7
VMT/Emp 84.1 116.3 120.5 117.4
11208620 24
Figure 16 VMT by Speed Bin

3.2 Evaluate Functional Roadway Classifications for Declassification Once the preferred alternative is selected, further evaluation will occur on city roadways in evaluating the appropriate functional roadway classification for the Circulation Element. Per city and Existing Conditions analysis, some roads may be declassified such as Alvin Avenue, Donovan Road, E Street, Black Road, and Mahoney Road.
• Alvin Avenue – Secondary Arterial functioning at LOS A in existing conditions and all three alternative scenarios for 2050
• Donovan Road, east of Broadway (SR 135) – Secondary Arterial functioning at LOS A in existing conditions and all three alternative scenarios for 2050 • E Street – No existing roadway segment volumes at this location • Foster Road – Secondary Arterial functioning at LOS A in existing conditions but at LOS F in all three alternative scenarios for 2050
• Black Road – No existing roadway segment volumes at this location • Mahoney Road – No existing roadway segment volumes at this location

3.3 Recommendations
The traffic needs from the base model and future (2050 SBCAG’s RTP forecast) scenarios show that US 101 north of Santa Maria would benefit from widening. US 101 through the City of Santa Maria widens to three lanes in each direction but drops back down to two lanes in each direction around the San Luis Obispo County 11208620 25
line. With the current push to reduce greenhouse gas emissions (GHGs), it is unlikely a widening project will occur so it will be important to identify alternative modes such as Bus Rapid Transit, commuter rail, or ride sharing services.

4. Transportation Policies
There were no distinguishable traffic differentiators to the three alternatives in relation to the congestion on the roadways. Therefore, it is recommended that the city implement various transportation policies that guide and lead the transportation infrastructure and complement the various recommendations from the city plans.

4.1 Reduce Vehicle Miles Traveled
Support mixed use developments with infrastructure that supports all transportation modes.

In July 2017, California passed assembly bill (AB) 398 to reauthorize the state’s economy-wide greenhouse gas (GHG) reduction program. The goal is to reduce GHG of at least 40% before the 1990 level of emissions by 2030. In order to comply with the state’s greenhouse gases reduction metrics by 2030, it is important to create sustainable transportations systems for all modes with mixed land uses in reducing the overall need to travel.

In addition, Senate Bill (SB) 743 was signed into law in 2013, with the intent to better align CEQA practices with statewide sustainability goals related to efficient land use, greater multimodal choices, and greenhouse gas reductions. The provisions of SB 743 became effective Statewide on July 1, 2020. Under SB 743, automobile delay, traditionally measured as level of service (LOS), are no longer considered an environmental impact under CEQA. Instead, impacts are determined by changes to VMT. Based on Office of Planning and Research (OPR) guidance, this project would likely be screened out (see below).

4.2 Speed Management
Implement a Citywide speed management policy and program.

There is a direct correlation between vehicle speeds and pedestrian and bicycle injury or death. Therefore, it is important to have a transportation system that has the correct geometrics and safety improvements in place to control speeds. In addition, additional enforcement and speed education are important in managing speeds.

4.3 Road Diets
Implement a Road Diet Policy in Reallocating Space for Alternative Transportation Modes Road diets can reallocate travel lanes to space for alternative modes of transportation (bicycle lanes, transit lanes, and bus turnouts). Most common applications include converting a four-lane roadway to a three-lane roadway with a two-way left turn lane (TWLTL). Figure 17 shows a road diet with adjacent parallel parking.

Figure 17 Cross Section of a Road Diet Concept
Road diets can also improve safety by reducing the vehicle conflict points for left-turning movements at intersections and driveways. On a four-lane divided road, left-turning traffic from the major street must store in 11208620 26
the through lane before making the turn. In addition, vehicles turning left out of the minor street or driveway will have to cross additional lanes and have more conflict points. A road diet can reduce the travel lanes a vehicle must cross and provide a painted median storage (TWLTL) for a vehicle to make a two-stage crossing.

4.3.1 Average Daily Traffic (ADT) Volume Consideration
FHWA advises that roadways with ADT of 20,000 vpd or less may be good candidates for a road diet and should be evaluated for feasibility. With a road diet, it is important to evaluate the intersections along the corridor, as well as the segments, as they can act as the bottlenecks. Therefore, road diets should consider additional intersection operational improvements.

4.3.1.1 Level of Service Analysis at Select Roadway Segments Several roadway segments were identified in the Existing Conditions report for potential road diets. The LOS was determined using existing and forecasted ADT volumes. The resulting LOS for each of the alternatives are shown in Table 3. For all but seven locations, the LOS was A for the existing and alternative scenarios, keeping lane geometry the same.

The locations classified as four-lane, secondary arterial from Table 3 were further analyzed to evaluate the difference in LOS if the number of lanes reduced to two. The results from this analysis are displayed in Table 4.

Out of the 30 locations analyzed, 8 locations have a failing LOS after reducing the number of lanes in future scenarios. Those locations that fail in 2050 should be evaluated during the growth of the City as currently the traffic volumes support a road diet.
11208620 27
Table 3 Level of Service at Select Roadway Segments
11208620 28
Table 4 Resulting LOS from Two-Lane Reduction at Four-Lane Secondary Arterials

4.3.2 Changes to Typical Sections
Encouraging a mode shift is recommended due to the increased impact of vehicles in the future scenario. One strategy to reduce the vehicular impact on the roadways is installing increased multimodal infrastructure.

Currently, the city’s Standard Drawings for typical sections are provided by land use, including residential, commercial, and industrial. These standard drawings are similar in nature and have limited accommodations for alternate modes of travel, especially bicycles (see Figures 18, 19, 22 and 23 below). Existing residential and commercial typical sections are identical, except for sidewalk and ROW width. Proposed alternative typical sections are proposed for commercial and residential land uses to provide a better level of traffic stress for bicycles. Some proposed changes to accommodate these alternate modes are displayed in Figures 20, 21, and 24. These typical sections show what can be done to repurpose the outside lanes for bikeways. With many of the city roadways varying in width, it will be important to evaluate each roadway on a case by case basis with the traffic volumes and current cross section.

Road Location No Change Reducing
Lanes No Change Reducing Lanes No Change Reducing Lanes Alvin Ave W. of Railroad Ave A A A A A A
Alvin Ave W. of College Dr A C A B A C
Alvin Ave E. of Bradley Rd A C A A A B
Alvin Ave W. of Suey Rd A A A A A A
Battles Rd E. of Blosser Rd A B A C A C
Battles Rd W. of Blosser Rd A A A C A C
Battles Rd W. of Bradley Rd A D C F C F
Battles Rd W. of Broadway (SR 135) A B A B A C
Blosser Rd S. of Taylor St A B A B A C
Bradley Rd S. of Cottage Ln A A A A A A
Bradley Rd S. of Bello Rd A A A A A A
Bradley Rd S. of Battles Rd A E A B A C
College Dr N. of Battles Rd B F B F C F
College Dr N. of Main (SR 166) A F A E A F
College Dr N. of Alvin Ave A B A B A B
College Dr S. of Donovan Rd A C A B A C
Depot St N. of Carmen Ln A A A A A A
Depot St N. of Stowell Rd A D A F A F
Donovan Rd W. of Railroad Ave A C A D A C
Donovan Rd W. of Suey Rd A A A A A A
Fesler St E. of Broadway (SR 135) A A A A A A
Fesler St W. of Broadway (SR 135) A B A B A B
McCoy Ln E. of Skyway Dr A C A D A D
McCoy Ln E. of College Dr (roundabout) A A A A A A
McCoy Ln W. of College Dr (roundabout) A B A B A B
Panther Dr S. of Suey Crossing Rd A A A A A A
Santa Maria Wy S. of Miller Wy A F A F A F
Santa Maria Wy S. of Dauphin St A F A F B F
Stowell Rd W. of Blosser Rd B F A F B F
Suey Rd N. of Alvin Ave A A A A A A
Failing LOS (LOS E or LOS F)
City of Santa Maria Roadway Inventory
Existing Characteristics 2050 Annex LOS 2050 Infill LOS 2050 Hybrid LOS 11208620 29
Secondary Arterial
Figure 18 Existing Typical Section for Secondary Arterial (Residential Street) Figure 19 Existing Typical Section for Secondary Arterial (Commercial Street) Figure 20 Proposed Typical Section for Secondary Arterial (Parking-Protected Bike Lanes) Figure 21 Proposed Typical Section for Secondary Arterial (Buffered Bike Lanes and Parking) 11208620 30
Primary Arterial
Figure 22 Existing Typical Section for Primary Arterial (Residential Street) Figure 23 Existing Typical Section for Primary Arterial (Commercial Street) Figure 24 Proposed Typical Section for Primary Arterial (Bicycle Lane with Raised Buffer) Figure 23 show how you can repurpose space on wider arterials for a protected bike lane. Primary arterials typically have higher speeds and volumes so need a higher degree of protection from vehicles. In addition, lanes can be narrowed based on the vehicle needs (lower truck and heavy vehicle volumes support 11’ lanes).

4.3.3 Peak Hour Volume Feasibility
The peak hour volume in the peak direction will be the measure of volume driving the analysis and can determine where the Road Diet can be feasibly implemented. See Table 5 below for FHWA’s road diet feasibility based on vehicle per hour per direction (vphpd) thresholds during the peak hour.

Table 5 FHWA Road Diet Feasibility
Feasibility Thresholds During the Peak hour
Probably feasible ≤ 750 vphpd
Consider cautiously 750 – 875 vphpd
Feasibility Less Likely ≥ 875 vphpd
11208620 31

4.4 Emerging Technologies
Support and implement projects with emerging technologies for improved multimodal operations.

Emerging technologies can include converting the existing traffic signals with inductive loop detection to video detection for bicycle detection. In addition, with new controllers at the signalized locations, leading pedestrian intervals can be implemented in giving the pedestrians 5 seconds of time before the vehicles, to establish their right of way in the crosswalks.

4.4.1 Transit Priority Routes
Prioritizing alternative modes can reduce vehicle congestion and greenhouse gases in high-density land use areas that support transit priority routes such as Broadway. Figure 23 shows an example of a typical section for a primary arterial that dedicates a travel lane to buses (red bus lane). This typical section will be especially important along the Broadway corridor in the Infill Alternatives where there is proposed much high land use densities and a major bus route.

Figure 25 Proposed Typical Section for Primary Arterial (Transit Only Lane)

5. Conclusion
The results of the assessed information from this memorandum are summarized in matrix format in Table 6.

These results are categorized from best to worst alternative, given the corresponding analysis scenario.

According to this matrix, Alternative B (Infill) is the recommended alternative. However, Alternative B (Infill) has significant VMT increase when compared to the original Base model. This VMT increase is not favorable to decreasing GHGs. It is suggested that the preferred infill alternative follow the Sustainable Communities Strategy which promotes growth based on a balance between housing and jobs.

Table 6 Alternatives Evaluation Matrix
11208620 32
Per the model, with the anticipated growth in 2050 for any land use scenario, many roadways will reach or exceed capacity thresholds. Therefore, it is very important to provide alternative modes of transportation as a priority, which shifts vehicle traffic to transit, biking, or walkable trips.

From the level-of-service analysis, several roadways in Santa Maria have opportunities for road diets based on the existing and forecasted future volumes. A road diet can allow bikeways to be added with minimal cost and provide connectivity in the transportation system. With the suggested new typical sections for the secondary arterial, evaluation of the current road cross section would need to be further assessed to see what could feasibly be accommodated. These roadways could still function as a secondary arterial versus a collector roadway but can have the additional lanes repurposed for alternative modes. 11208620 32
Attachment 1
Roadway Level-of-Service
Road Direction Location Facility Type Lanes Year Volume LOS Volume LOS Volume LOS Volume LOS US 101 N-S N. of Clark Ave Freeway 4 (divided) 2017 45,500 B 65,900 D 64,670 D 66,180 D US 101 N-S S. of Clark Ave Freeway 4 (divided) 2019 35,800 B 45,870 B 45,770 B 46,070 B US 101 N-S N. of Santa Maria Wy
Junction Freeway 6 (divided) 2017 57,000 B 112,010 F 105,460 E 111,530 F US 101 N-S S. of Santa Maria Wy
Junction Freeway 4 (divided) 2017 59,000 C 92,440 F 90,110 F 92,690 F US 101 N-S N. of Betteravia Rd Freeway 6 (divided) 2017 68,000 B 117,820 F 112,700 F 115,900 F US 101 N-S S. of Betteravia Rd Freeway 6 (divided) 2017 57,000 B 112,010 F 105,460 E 111,530 F US 101 N-S N. of Stowell Rd Freeway 6 (divided) 2017 74,000 B 126,900 F 128,020 F 128,560 F US 101 N-S S. of Stowell Rd Freeway 6 (divided) 2017 68,000 B 134,540 F 125,860 F 132,400 F US 101 N-S N. of SR 166 (Main St) Freeway 6 (divided) 2017 70,000 B 171,210 F 160,430 F 171,370 F US 101 N-S S. of SR 166 (Main St) Freeway 6 (divided) 2017 74,000 B 157,770 F 156,530 F 161,910 F US 101 N-S N. of SR 135 (Broadway) Freeway 6 (divided) 2019 82,090 C 208,810 F 198,890 F 212,870 F US 101 N-S S. of SR 135 (Broadway) Freeway 6 (divided) 2017 67,000 B 170,420 F 160,720 F 170,080 F Orcutt Expressway
(SR 135) N-S N. of Clark Ave Arterial 4 (divided) 2017 29,500 C 32,780 D 33,500 D 33,430 D Orcutt Expressway
(SR 135) N-S S. of Clark Ave Arterial 4 (divided) 2017 20,100 A 23,830 A 24,280 B 23,440 A Orcutt Expressway
(SR 135) N-S N. of Foster Rd Arterial 4 (divided) 2017 37,000 E 74,250 F 76,290 F 76,030 F Orcutt Expressway
(SR 135) N-S S. of Foster Rd Arterial 4 (divided) 2017 24,600 B 37,560 E 39,830 E 39,410 E Orcutt Expressway
(SR 135) N-S N. of Lakeview Rd Arterial 4 (divided) 2017 32,000 D 50,670 F 51,870 F 52,020 F Orcutt Expressway
(SR 135) N-S N. of Miller St Arterial 4 (divided) 2017 43,000 F 51,970 F 52,410 F 52,010 F Orcutt Expressway
(SR 135) N-S S. of Miller St Arterial 4 (divided) 2017 37,500 E 54,660 F 56,140 F 56,300 F Orcutt Expressway
(SR 135) N-S N. of Santa Maria Way Arterial 4 (divided) 2017 41,000 F 62,490 F 63,190 F 63,410 F Orcutt Expressway
(SR 135) N-S S. of Santa Maria Way Arterial 4 (divided) 2017 44,500 F 53,580 F 54,020 F 53,630 F Broadway (SR 135) N-S N. of Betteravia Rd Primary
Arterial 6 (divided) 2017 47,000 F 63,180 F 63,780 F 64,860 F Broadway (SR 135) N-S S. of Betteravia Rd Primary
Arterial 6 (divided) 2017 47,500 F 75,850 F 76,170 F 78,580 F Broadway (SR 135) N-S N. of Stowell Rd Arterial 4 (divided) 2017 40,500 F 56,570 F 54,670 F 58,770 F Broadway (SR 135) N-S S. of Stowell Rd Arterial 4 (divided) 2017 44,500 F 71,920 F 72,980 F 76,820 F Broadway (SR 135) N-S N. of Main St Arterial 4 (divided) 2017 28,500 C 44,400 F 42,510 F 45,730 F Broadway (SR 135) N-S S. of Main St Arterial 4 (divided) 2017 26,500 B 38,860 E 37,730 E 41,100 F Broadway (SR 135) N-S N. of Donovan Rd Arterial 4 (divided) 2017 27,000 B 48,860 F 48,360 F 51,900 F Broadway (SR 135) N-S S. of Donovan Rd Arterial 4 (divided) 2017 27,500 B 40,890 F 39,980 F 42,780 F Broadway (SR 135) N-S W. of US 101 Arterial 4 2017 23,900 A 55,520 F 54,930 F 58,620 F Main St (SR 166) E-W W. of Blosser Rd Arterial 2 (TWLTL) 2018 14,200 C 23,700 F 22,180 F 23,320 F Main St (SR 166) E-W E. of Blosser Rd Arterial 4 (TWLTL) 2018 15,900 A 22,910 A 23,180 A 23,920 B Main St (SR 166) E-W E. of Suey Rd Arterial 4 (TWLTL) 2015 6,400 A 29,430 C 7,370 A 19,150 A Main St (SR 166) E-W W. of Suey Rd Arterial 4 (TWLTL) 2018 8,700 A 29,260 C 10,250 A 18,830 A Main St (SR 166) E-W US 101 SB-Off Ramp Arterial 2 2018 29,500 F 39,250 F 40,280 F 40,850 F Main St (SR 166) E-W E. of Broadway (SR 135) Arterial 4 (divided) 2018 26,500 B 32,970 D 30,700 C 32,800 D Main St (SR 166) E-W W. of Broadway (SR 135) Arterial 4 (divided) 2018 18,800 A 25,720 B 23,280 A 25,020 B A St N-S S. of Betteravia Dr Secondary
Arterial 2 (TWLTL) 2015 3,450 A 4,120 A 4,850 A 4,590 A A St N-S S. of Sonya Ln Secondary
Arterial 2 2019 3,650 A 5,690 A 10,420 A 9,410 A
Alvin Ave E-W W. of Railroad Ave Secondary
Arterial 4 2018 8,510 A 9,620 A 9,180 A 10,000 A
Alvin Ave E-W W. of College Dr Secondary
Arterial 4 2018 7,700 A 15,620 A 12,850 A 14,730 A
Alvin Ave E-W E. of Bradley Rd Secondary
Arterial 4 2018 6,670 A 14,550 A 11,720 A 13,640 A
Alvin Ave E-W W. of Suey Rd Secondary
Arterial 4 2018 3,440 A 9,760 A 7,050 A 8,670 A
Battles Rd E-W E. of Blosser Rd Secondary
Arterial 4 2018 10,740 A 13,690 A 15,610 A 15,810 A
Battles Rd E-W W. of Blosser Rd Secondary
Arterial 4 2018 9,320 A 10,370 A 14,400 A 14,140 A
Battles Rd E-W W. of Bradley Rd Secondary
Arterial 4 2018 7,670 A 17,170 A 28,320 C 28,470 C
City of Santa Maria Roadway Inventory
Characteristics Existing 2050 Annex 2050 Infill 2050 Hybrid Road Direction Location Facility Type Lanes Year Volume LOS Volume LOS Volume LOS Volume LOS City of Santa Maria Roadway Inventory
Characteristics Existing 2050 Annex 2050 Infill 2050 Hybrid Battles Rd E-W E. of Broadway (SR 135) Secondary
Arterial 4 2015 13,220 A 16,540 A 17,580 A 18,190 A
Battles Rd E-W W. of Broadway (SR 135) Secondary
Arterial 4 2019 11,650 A 12,700 A 13,680 A 14,120 A
Bay Ave N-S b/w Donovan Rd and
Harding Ave Local 2 2015 3,490 A 3,490 A 3,490 A 3,490 A Betteravia Dr E-S E. of A St Primary
Arterial 4 (divided) 2018 14,630 A 20,500 A 36,120 E 33,830 D Betteravia Dr E-S E. of Skyway Dr Primary
Arterial 4 (divided) 2018 15,390 A 26,920 B 35,200 D 34,600 D Betteravia Dr E-W E. of Bradley Dr Primary
Arterial 6 (divided) 2018 38,460 E 55,320 F 56,990 F 57,830 F Betteravia Dr E-W W. of College Dr Primary
Arterial 6 (divided) 2018 34,170 D 62,130 F 61,000 F 65,080 F Betteravia Dr E-W W. of Depot St Primary
Arterial 4 (TWLTL) 2018 20,620 A 39,440 E 45,310 F 45,130 F Betteravia Dr E-W E. of Broadway (SR 135) Primary
Arterial 6 (divided) 2018 30,350 C 48,580 F 49,690 F 51,440 F Blosser Rd N-S S. of Foster Rd Secondary
Arterial 2 2015 2,220 A 42,130 F 41,530 F 41,570 F
Blosser Rd N-S S. of Stowell Rd Secondary
Arterial 4 (TWLTL) 2018 24,120 B 41,890 F 47,450 F 48,930 F Blosser Rd N-S b/w Boone St and Cook St Secondary
Arterial 4 (TWLTL) 2018 23,530 A 31,860 C 39,390 E 40,390 F Blosser Rd N-S S. of Main St (SR 166) Secondary
Arterial 4 2015 24,960 B 33,480 D 40,160 F 40,990 F
Blosser Rd N-S S. of Alvin Ave Secondary
Arterial 4 2019 14,140 A 23,250 A 25,260 B 26,580 B
Blosser Rd N-S S. of Donovan Rd Secondary
Arterial 4 2018 15,200 A 23,770 A 25,180 B 26,000 B
Blosser Rd N-S N. of Taylor St Secondary
Arterial 2 2015 5,120 A 5,930 A 6,000 A 6,360 A
Blosser Rd N-S S. of Taylor St Secondary
Arterial 4 2018 7,970 A 13,010 A 13,390 A 14,500 A
Blosser Rd N-S N. of Canal St Secondary
Arterial 2 2018 2,700 A 2,610 A 2,690 A 2,790 A
Bradley Rd N-S S. of Cottage Ln Secondary
Arterial 4 (TWLTL) 2018 1,000 A 5,030 A 4,430 A 5,250 A Bradley Rd N-S S. of Bello Rd Secondary
Arterial 4 (TWLTL) 2019 4,960 A 6,360 A 5,800 A 6,200 A Bradley Rd N-S S. of Betteravia Dr Secondary
Arterial 4 2018 22,740 A 27,410 B 26,700 B 27,330 B
Bradley Rd N-S N. of Battles Rd Secondary
Arterial 4 (TWLTL) 2018 16,420 A 33,360 D 39,770 E 42,140 F Bradley Rd N-S S. of Battles Rd Secondary
Arterial 4 (TWLTL) 2018 10,760 A 18,410 A 13,460 A 15,670 A Bradley Rd N-S N. of Stowell Rd Secondary
Arterial 2 2018 14,860 F 18,170 F 17,610 F 18,730 F
Bradley Rd N-S b/w SR 101 SB-On Ramp
and Cypress St (one-way)
Secondary
Arterial 2 2018 3,750 A 7,830 B 3,940 A 6,590 A
Bradley Rd E-W E. of College Dr Secondary
Arterial 2 2015 3,950 A 3,950 A 3,950 A 3,950 A
Bull Canyon Rd N-S N. of Panther Dr Collector 2 2018 260 A 2,510 A 1,640 A 2,870 A California Blvd N-S S. of Foster Rd Local 2 2015 1,460 A 1,840 A 1,790 A 1,810 A Camino Colegio E-W E. of Miller St Local 2 2015 1,280 A 1,460 A 1,580 A 1,580 A Camino Colegio E-W W. of Miller St Local 2 2015 1,400 A 1,500 A 1,490 A 1,580 A Canal St E-W E. of Blosser Rd Collector 2 2019 1,140 A 1,910 A 1,900 A 2,050 A Carlotti Dr N-S b/w Noble Wy and Paden
St Collector 2 2015 5,490 A 19,590 F 20,070 F 19,740 F
Carlotti Dr N-S b/w Stanford Dr and
Murray Dr Collector 2 2015 3,700 A 19,380 F 19,780 F 19,470 F Carmen Ln E-W W. of Thornburg St Collector 2 2015 5,440 A 4,000 A 4,080 A 4,190 A Carmen Ln E-W W. of Broadway (SR 135) Collector 2 2015 7,580 A 8,630 A 8,420 A 8,630 A Centennial St N-S b/w Mt Whitney Wy and
Panther Dr
Collector
(proposed) 2 2015 1,480 A 1,480 A 1,480 A 1,480 A
Cesar E Chavez Dr N-S S. of Hidden Pines Wy Collector 2 2013 3,390 A 3,450 A 3,480 A 3,450 A College Dr N-S E. of Santa Maria Wy Secondary
Arterial 4 (divided) 2019 9,730 A 25,870 B 25,050 B 25,680 B College Dr N-S N. of McCoy Ln
(Roundabout)
Secondary
Arterial 4 2015 11,240 A 14,080 A 14,250 A 14,320 A
College Dr N-S S. of McCoy Ln
(Roundabout)
Secondary
Arterial 4 2019 8,230 A 17,690 A 18,690 A 18,960 A
Road Direction Location Facility Type Lanes Year Volume LOS Volume LOS Volume LOS Volume LOS City of Santa Maria Roadway Inventory
Characteristics Existing 2050 Annex 2050 Infill 2050 Hybrid College Dr N-S S. of Sunrise Dr Secondary
Arterial 4 (divided) 2018 10,960 A 21,210 A 21,600 A 22,260 A College Dr N-S N. of Betteravia Dr Secondary
Arterial 4 (divided) 2019 9,300 A 23,380 A 24,760 B 28,040 C College Dr N-S S. of Betteravia Dr Secondary
Arterial 4 (divided) 2018 10,840 A 14,070 A 14,150 A 14,220 A College Dr N-S N. of Battles Rd Secondary
Arterial 4 (divided) 2018 10,760 A 24,600 B 25,480 B 28,330 C College Dr N-S N. of Stowell Rd Secondary
Arterial 4 (TWLTL) 2018 12,310 A 31,400 C 30,170 C 33,430 D College Dr N-S N. of Boone St/Jones St Secondary
Arterial 2 2019 9,610 A 34,140 F 31,920 F 36,370 F
College Dr N-S S. of Boone St/Jones St Secondary
Arterial 2 2015 9,930 A 29,480 F 29,140 F 33,150 F
College Dr N-S N. of Main (SR 166) Secondary
Arterial 4 (TWLTL) 2019 8,620 A 20,780 A 18,820 A 21,930 A College Dr N-S N. of Alvin Ave Secondary
Arterial 4 2015 5,820 A 12,940 A 12,540 A 13,930 A
College Dr N-S S. of Donovan Rd Secondary
Arterial 4 2018 8,020 A 14,230 A 13,810 A 15,100 A
Concepcion Ave N-S N. of Jones St Collector 2 2018 970 A 920 A 1,140 A 920 A Cook St E-W W. of Depot St Collector 2 2018 6,190 A 6,800 A 7,100 A 7,300 A Cook St E-W W. of Broadway (SR 135) Collector 4 (divided) 2017 8,870 A 11,090 A 12,190 A 12,420 A Cook St E-W E. of Broadway (SR 135) Collector 4 (divided) 2018 8,990 A 11,550 A 11,810 A 11,610 A Cook St E-W b/w Miller St and School
St Collector 2 2015 3,150 A 6,090 A 6,170 A 6,310 A
Cook St E-W b/w East Ave and College
Dr Collector 2 2015 2,190 A 4,700 A 4,740 A 4,850 A
Crossroad Ln E-W W. of Bradley Rd Collector 2 2018 4,800 A 7,570 A 7,650 A 7,990 A Depot St N-S N. of Carmen Ln Secondary
Arterial 4 2015 4,500 A 6,020 A 5,870 A 6,420 A
Depot St N-S N. of Battles Rd Secondary
Arterial 2 2018 10,450 B 9,070 A 8,610 A 9,880 B
Depot St N-S N. of Stowell Rd Secondary
Arterial 4 2018 9,560 A 16,660 A 20,860 A 21,560 A
Depot St N-S N. of Main (SR 166) Secondary
Arterial 2 2018 8,940 A 10,740 A 10,620 A 10,960 A
Depot St N-S S. of Cook St Secondary
Arterial 2 2018 8,280 A 19,830 E 22,370 F 23,660 F
Donovan Rd E-W W. of Railroad Ave Secondary
Arterial 4 2018 11,580 A 14,490 A 16,130 A 15,970 A
Donovan Rd E-W W. of Broadway (SR 135) Secondary
Arterial 4 2015 17,390 A 26,280 B 26,540 B 28,230 C
Donovan Rd E-W E. of Broadway (SR 135) Secondary
Arterial 4 2018 16,580 A 18,050 A 17,090 A 17,780 A
Donovan Rd E-W W. of College Dr Secondary
Arterial 4 (divided) 2019 19,010 A 21,760 A 20,660 A 22,350 A Donovan Rd E-W E. of College Dr Secondary
Arterial 4 (divided) 2018 23,900 A 29,430 C 28,520 C 30,080 C Donovan Rd E-W W. of Carlotti Dr Secondary
Arterial 4 2018 23,040 A 34,270 D 33,560 D 34,920 D
Donovan Rd E-W W. of Suey Rd Secondary
Arterial 4 2018 7,530 A 8,980 A 7,650 A 9,190 A
Enos Dr E-W E. of College Dr Collector 2 2015 2,850 A 3,590 A 3,030 A 3,180 A Fairway Dr E-W E. of A St Collector 2 2015 2,700 A 3,740 A 4,040 A 3,920 A Fairway Dr E-W E. of Skyway Dr Collector 2 2015 3,490 A 5,540 A 5,230 A 5,670 A Farrell Dr N-S N. of Jones St Local 2 2018 2,740 A 2,750 A 2,740 A 2,750 A Fesler St E-W E. of Broadway (SR 135) Secondary
Arterial 4 2018 5,640 A 11,950 A 10,980 A 11,870 A
Fesler St E-W W. of Broadway (SR 135) Secondary
Arterial 4 2015 6,880 A 12,230 A 13,730 A 13,590 A
Fesler St E-W b/w Benwiley Ave and
Railroad Ave
Secondary
Arterial 2 2018 3,800 A 4,680 A 4,930 A 4,890 A
Foster Rd E-W W. of Orcutt Expressway
(SR 135) Collector 2 2019 4,190 A 30,930 F 31,700 F 31,470 F Foxenwood Ln N-S S. of Foster Rd Collector 2 2015 810 A 930 A 890 A 880 A Grant St E-W b/w Broadway (SR 135)
and River Ranch Dr Collector 2 2015 5,230 A 5,460 A 5,360 A 5,230 A Hidden Pines Wy E-W W. of Preisker Ln Collector 2 2015 7,950 A 8,730 A 8,670 A 8,770 A Industrial Pkwy N-S E. of Skyway Dr Collector 2 (TWLTL) 2019 1,870 A 3,920 A 3,610 A 4,050 A La Brea Ave E-W W. of Blosser Rd Collector 2 2015 1,910 A 2,730 A 10,300 B 10,320 B Lynne Dr N-S b/w Lee Dr and Donovan
Rd Collector 2 2015 5,670 A 6,040 A 6,050 A 6,360 A
Road Direction Location Facility Type Lanes Year Volume LOS Volume LOS Volume LOS Volume LOS City of Santa Maria Roadway Inventory
Characteristics Existing 2050 Annex 2050 Infill 2050 Hybrid Jones St E-W E. of Farrell Dr Collector 2 2018 7,990 A 22,970 F 13,750 D 20,820 F Jones St E-W W. of Bradley Rd Collector 2 2018 4,400 A 19,400 F 10,170 B 17,250 F McClelland St N-S S. of Cook St Collector 2 2015 3,330 A 4,000 A 3,960 A 4,270 A McCoy Ln E-W E. of A St Secondary
Arterial 2 2,880 A 3,010 A 3,330 A 3,320 A
McCoy Ln E-W E. of Skyway Dr Secondary
Arterial 4 (TWLTL) 2018 11,850 A 15,240 A 16,170 A 16,300 A McCoy Ln E-W E. of Broadway (SR 135) Secondary
Arterial 4 (divided) 2018 12,760 A 18,000 A 18,520 A 18,860 A McCoy Ln E-W W. of Broadway (SR 135) Secondary
Arterial 4 (divided) 2019 14,960 A 19,200 A 20,500 A 20,530 A McCoy Ln E-W E. of College Dr
(roundabout)
Secondary
Arterial 4 2015 5,330 A 5,400 A 5,370 A 5,410 A
McCoy Ln E-W W. of College Dr
(roundabout)
Secondary
Arterial 4 2019 6,380 A 12,350 A 13,320 A 13,680 A
Miller St N-S N. of Battles Rd Secondary
Arterial 4 (divided) 2018 14,540 A 26,250 B 27,520 B 28,780 C Miller St N-S N. of Stowell Rd Secondary
Arterial 2 2018 13,420 B 19,720 E 19,250 E 20,450 F
Miller St N-S S. of Main (SR 166) Secondary
Arterial 4 (divided) 2017 14,770 A 21,780 A 22,090 A 23,260 A Miller St N-S S. of Alvin Ave Secondary
Arterial 2 2015 8,520 A 11,140 A 11,070 A 11,460 A
Miller St N-S b/w Lee Dr and Donovan
Rd
Secondary
Arterial 2 2015 4,160 A 5,640 A 5,500 A 5,890 A
Miller St N-S S. of Donovan Rd Secondary
Arterial 4 2018 5,840 A 8,170 A 7,880 A 8,570 A
Miller St E-W E. of Santa Maria Wy Secondary
Arterial 4 (divided) 2018 11,120 A 23,190 A 23,890 A 24,070 B Miller St N-S S. of Betteravia Dr Secondary
Arterial 4 (divided) 2018 13,990 A 27,980 C 28,100 C 28,630 C Morrison Ave E-W W. of Broadway (SR 135) Collector 2 2015 5,140 A 6,430 A 6,830 A 6,310 A Morrison Ave E-W W. of Depot St Collector 2 2018 5,500 A 6,150 A 5,960 A 6,110 A Palisade Dr N-S S. of Main (SR 166) Local 2 2018 7,440 B 8,340 C 7,810 B 8,070 B Panther Dr N-S S. of Suey Crossing Rd Secondary
Arterial 4 2015 4,810 A 6,250 A 5,720 A 6,040 A
Preisker Ln N-S N. of Broadway (SR 135) Collector 2 2018 10,880 B 11,950 C 11,820 C 11,970 C Professional Pkwy N-S N. of McCoy Ln Collector 2 2015 2,760 A 3,150 A 3,150 A 3,180 A Railroad Ave N-S N. of Fesler Ave Secondary
Arterial 2 (TWLTL) 2019 8,750 A 11,410 A 11,390 A 11,700 A Railroad Ave N-S b/w Donovan Rd and
Harding Ave
Secondary
Arterial 2 2018 9,980 A 12,050 B 12,080 B 12,340 B
Railroad Ave N-S N. of Taylor St Secondary
Arterial 2 2015 6,160 A 10,240 A 9,880 A 10,600 A
Railroad Ave N-S S. of Taylor St Secondary
Arterial 2 2015 7,780 A 12,270 B 12,000 A 12,970 B
Santa Maria Wy N-S S. of Miller Wy Secondary
Arterial 4 (divided) 2017 10,470 A 21,810 A 22,050 A 22,900 A Santa Maria Wy N-S S. of Dauphin St Secondary
Arterial 4 (divided) 2018 10,420 A 22,890 A 22,710 A 24,910 B Shepard Dr N-S N. of Battles Rd Collector 2 2015 1,900 A 2,860 A 2,640 A 3,260 A Sierra Madre Ave E-W W. of Bradley Rd Collector 2 2015 1,350 A 4,880 A 3,250 A 4,020 A Skyway Dr N-S S. of Industrial Pkwy Secondary
Arterial 4 (divided) 2015 15,740 A 28,790 C 31,530 C 31,200 C Skyway Dr E-S W. of Orcutt Expressway
(SR 135)
Secondary
Arterial 4 (divided) 2018 17,350 A 31,070 C 33,180 D 32,510 D Skyway Dr N-S N. of Fairway Dr Secondary
Arterial 4 (divided) 2019 16,540 A 30,900 C 32,550 D 32,960 D Skyway Dr N-S S. of Fairway Dr Secondary
Arterial 4 (divided) 2019 15,260 A 27,940 C 30,570 C 30,430 C Skyway Dr N-S N. of Betteravia Dr Secondary
Arterial 4 (divided) 2018 20,010 A 35,450 D 33,650 D 34,880 D Skyway Dr N-S S. of Betteravia Dr Secondary
Arterial 4 (divided) 2018 19,530 A 31,040 C 32,120 D 32,460 D Sonya Ln E-W E. of A St Collector 2 2015 360 A 750 A 940 A 890 A Southside Pkwy E-S E. of Centerpoint Pkwy Collector 2 2015 1,400 A 1,400 A 1,370 A 1,380 A Southside Pkwy E-S W. of Bradley Rd
(Roundabout) Collector 2 2018 4,940 A 4,940 A 4,940 A 4,940 A Stowell Rd E-W W. of Bradley Rd Secondary
Arterial 4 (TWLTL) 2018 20,220 A 35,320 D 31,660 C 34,600 D Stowell Rd E-W W. of Depot St Secondary
Arterial 4 (TWLTL) 2018 14,020 A 27,360 B 28,530 C 30,490 C Road Direction Location Facility Type Lanes Year Volume LOS Volume LOS Volume LOS Volume LOS City of Santa Maria Roadway Inventory
Characteristics Existing 2050 Annex 2050 Infill 2050 Hybrid Stowell Rd E-W W. of Blosser Rd Secondary
Arterial 4 (TWLTL) 2018 9,510 A 27,160 B 21,850 A 24,190 B Stowell Rd E-W W. of Hanson Wy Secondary
Arterial 2 2018 8,020 A 14,560 C 14,210 C 16,460 D
Suey Rd N-S N. of Jones St Secondary
Arterial 2 2015 5,300 A 10,740 A 7,590 A 9,510 A
Suey Rd N-S N. of Main (SR 166) Secondary
Arterial 2 2018 7,590 A 10,740 A 10,180 A 11,320 A
Suey Rd N-S N. of Alvin Ave Secondary
Arterial 4 2019 4,850 A 9,140 A 8,280 A 9,100 A
Sunrise Dr E-W W. of College Dr Collector 2 2015 2,440 A 2,510 A 2,510 A 2,510 A Sunrise Dr E-W E. of Santa Maria Wy Collector 2 2018 2,910 A 3,160 A 3,160 A 3,160 A Taylor St E-W W. of Railroad Ave Collector 2 2018 5,740 A 9,190 A 9,470 A 10,080 B Taylor St E-W W. of Broadway (SR 135) Collector 2 2015 10,930 B 12,130 C 12,340 C 12,890 D Thornburg St N-S N. of Betteravia Dr Collector 2 2018 6,150 A 6,330 A 6,210 A 6,310 A Thornburg St N-S N. of Carmen Ln Collector 2 2015 3,710 A 5,080 A 5,090 A 5,500 A Thornburg St E-W S. of Battles Rd Collector 2 2015 3,590 A 6,020 A 5,740 A 6,360 A Union Valley Parkway E-S W. of Orcutt Expressway
(SR 135)
Primary
Arterial 4 (divided) 2015 5,990 A 35,670 D 36,410 E 36,490 E Union Valley Parkway E-S E. of Blosser Rd Primary
Arterial 2 2015 1,630 A 29,400 F 30,460 F 29,920 F
Western Ave N-S N. of Stowell Rd Collector 2 2018 8,330 A 9,900 B 9,890 B 10,060 B Western Ave N-S N. of Main (SR 166) Collector 2 2013 4,290 A 5,250 A 5,260 A 5,410 A Western Ave N-S S. of Main (SR 166) Collector 2 2019 4,390 A 5,220 A 5,240 A 5,260 A Westgate Rd N-S S. of Battles Rd Collector 2 2019 3,590 A 3,590 A 3,590 A 3,590 A Westgate Rd N-S N. of Carmen Ln Collector 2 2015 1,640 A 1,640 A 1,640 A 1,640 A 11208620 33