Cities Index.
Agenda

Santa Maria City Council
November 17, 2026

Document
Agenda
Meeting
November 17, 2026
Body
Santa Maria City Council
Pages
20
Original file
288.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-santamaria.escribemeetings.com. That file is the official record.

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF SANTA MARIA, CALIFORNIA,

TO ADOPT AN INITIAL STUDY/MITIGATED NEGATIVE

DECLARATION FOR THE SANTA MARIA WASTEWATER

TREATMENT PLANT IMPROVEMENTS PROJECT
WHEREAS, the City of Santa Maria (City) proposes to expand and update its existing Wastewater Treatment Plant to accommodate anticipated growth, provide long-term reliable treatment, and adhere to applicable regulatory requirements including updated effluent discharge limits; and
WHEREAS, the City, in coordination with Carollo Engineers, prepared a Wastewater Treatment Plant Master Plan to provide a 35-year road map for the City’s wastewater treatment, disposal, and reuse needs, which replaces the City’s 1993 Master Plan; and
WHEREAS, as identified in the Wastewater Treatment Plant Master Plan, the proposed project includes three components: (1) near-term projects that must be completed prior to the initiation of Phase 1; (2) Phase 1 Improvements; and (3) Phase 2 Improvements; and
WHEREAS, the provisions of the California Environmental Quality Act of 1970 (CEQA), Public Resources Code Sections 21000 et. seq., as amended, require the evaluation of environmental impacts of said projects; and WHEREAS, an Initial Study/Mitigated Negative Declaration was prepared for said Project; the required notices were published and the Initial Study/Mitigated Negative Declaration was circulated for public review, sent to every responsible agency with jurisdiction over the project, and placed in a public location; and WHEREAS, the City Council has reviewed and considered the Initial Study/Mitigated Negative Declaration the Project; and
WHEREAS, there is no substantial evidence in the whole record before the City Council supporting a fair argument that the project as described in the Initial Study/Mitigated Negative Declaration will have a significant effect on the environment; and
WHEREAS, at the completion of the public hearing, the City Council duly considered all evidence presented at said hearing; and
WHEREAS, the Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program reflects the City Council’s independent judgment and analysis.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. The above recitals are true and correct and incorporated herein by reference.

SECTION 2. Adopt the Initial Study/Mitigated Negative Declaration (Attachment G of the City of Santa Maria Council Agenda Report dated November 17, 2026, incorporated herein by reference) for the Santa Maria Wastewater Treatment Plant Improvements Project.

SECTION 3. Adopt the Mitigation Monitoring and Reporting Program (Table A of the Initial Study/Mitigated Negative Declaration included as Attachment G to the City of Santa Maria Council Agenda Report dated November 17, 2026, incorporated herein by reference) for the Santa Maria Wastewater Treatment Plant Improvements Project.

SECTION 4. The records of these proceedings are located in the City of Santa Maria Utilities Department, 2065 East Main Street, Santa Maria, California 93454.

SECTION 5. Authorize the Chief Deputy City Clerk to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria, California, held this 17th day of November 2026.

ATTEST:

Chief Deputy City Clerk
Mayor
APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager
Attachment B

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF SANTA MARIA, CALIFORNIA,

ADOPTING THE WASTEWATER TREATMENT PLANT MASTER PLAN
WHEREAS, the City of Santa Maria (City) has operated wastewater treatment and disposal facilities at the Wastewater Treatment Plant since 1932, and improvements are necessary to address aging infrastructure, updated wastewater discharge requirements, limited disposal capacity, and anticipated future community growth; and WHEREAS, the Central Coast Regional Water Quality Control Board issued a Time Schedule Order on February 5, 2026, requiring the City to achieve compliance with applicable wastewater discharge requirements by September 30, 2034, and to submit an approved Wastewater Treatment Master Plan by December 31, 2026; and WHEREAS, the City, in coordination with Carollo Engineers, prepared the Wastewater Treatment Plant Master Plan to establish a long-term framework for maintaining, improving, and expanding the City's wastewater treatment and disposal system through approximately 2060, including a phased approach to modernizing treatment processes, rehabilitating and replacing aging infrastructure, increasing system capacity, and improving operational efficiency; and
WHEREAS, the Wastewater Treatment Plant Master Plan evaluates alternatives and identifies improvements to the existing Wastewater Treatment Plant as the preferred long-term approach, providing a coordinated framework for addressing the City's wastewater infrastructure needs, with individual projects to proceed through applicable environmental review, design, financing, and City approval processes.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. Adopt Wastewater Treatment Plant Master Plan, incorporated herein by reference, as the City's long-term planning framework for wastewater treatment and disposal system improvements; and
SECTION 2. Authorize the Director of Utilities or designee to make administrative and technical revisions to the Wastewater Treatment Plant Master Plan as necessary to meet updated regulatory or programmatic requirements; and SECTION 3. Authorize the Chief Deputy City Clerk to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

Attachment B

Page 2 of 2 ends

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on the 17th day of November 2026.

ATTEST:

Chief Deputy City Clerk
Mayor
APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager
Attachment C

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA,

AUTHORIZING AN APPLICATION FOR STATE WATER RESOURCES

CONTROL BOARD FINANCIAL ASSISTANCE FOR THE WASTEWATER

TREATMENT PLANT PERCOLATION POND EXPANSION PROJECT AND

DESIGNATING AN AUTHORIZED REPRESENTATIVE
WHEREAS, the City of Santa Maria (Entity) owns and operates a Wastewater Treatment Plant that requires improvements to address aging infrastructure, limited wastewater disposal capacity, updated regulatory requirements, and anticipated future community growth; and
WHEREAS, the Central Coast Regional Water Quality Control Board issued a Time Schedule Order requiring the City to achieve compliance with applicable wastewater discharge requirements by September 30, 2034, necessitating improvements to the City's wastewater treatment and disposal system; and
WHEREAS, the City identified the Percolation Pond Expansion Project, consisting of the construction of six additional percolation ponds totaling approximately 42 acres adjacent to the existing Wastewater Treatment Plant, as a near-term priority to increase wastewater disposal capacity and accommodate future needs; and WHEREAS, the City desires to pursue financing through the State Water Resources Control Board's Clean Water State Revolving Fund program to assist with the planning, design, and construction of the Percolation Pond Expansion Project.

NOW, THEREFORE, IT IS HEREBY RESOLVED by the City Council of the City of Santa Maria, California, as follows:

SECTION 1. The Director of Utilities (the “Authorized Representative”) or designee is hereby authorized and directed to sign and file, for and on behalf of the City of Santa Maria, a Financial Assistance Application for a financing agreement from the State Water Resources Control Board for the planning, design, and construction of the Wastewater Treatment Plant Percolation Pond Expansion Project (the “Project”).

SECTION 2. This Authorized Representative, or their designee, is designated to provide the assurances, certifications, and commitments required for the financial assistance application, including executing a financial assistance agreement from the State Water Resources Control Board and any amendments or changes thereto.

SECTION 3. The Authorized Representative, or their designee, is designated to represent the City of Santa Maria in carrying out the City's responsibilities under the financing agreement, including certifying disbursement requests on behalf of the City and compliance with applicable state and federal laws.

Attachment C

Page 2 of 2 ends

SECTION 4. Authorize the Chief Deputy City Clerk to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on the 17th day of November 2026.

ATTEST:

Chief Deputy City Clerk
Mayor
APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager
Attachment D

Page 1 of 2 ends

RESOLUTION NO.

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF SANTA MARIA, CALIFORNIA,
DECLARING THE CITY’S OFFICIAL INTENT TO REIMBURSE

CERTAIN PROJECT EXPENDITURES FROM FUTURE

STATE WATER RESOURCES CONTROL BOARD FINANCING PROCEEDS
WHEREAS, the City of Santa Maria (the "Agency") desires to finance the costs of constructing and/or reconstructing certain public facilities and improvements (the "Project"); and
WHEREAS, the Agency intends to finance the construction and/or reconstruction of the Project or portions of the Project with moneys ("Project Funds") provided by the State of California, acting by and through the State Water Resources Control Board (“State Water Board”); and
WHEREAS, the State Water Board may fund the Project Funds with proceeds from the sale of obligations the interest upon which is excluded from gross income for federal income tax purposes (the "Obligations"), and
WHEREAS, prior to either the issuance of the Obligations or the approval by the State Water Board of the Project Funds the Agency desires to incur certain capital expenditures (the "Expenditures") with respect to the Project from available moneys of the Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on and after the date hereof to pay the Expenditures are available only for a temporary period and it is necessary to reimburse the Agency for the Expenditures from the proceeds of the Obligations.

NOW, THEREFORE, IT IS HEREBY RESOLVED by this Agency of the City of Santa Maria, California, as follows:

SECTION 1. The Agency hereby states its intention and reasonably expects to reimburse Expenditures paid prior to the issuance of the Obligations or the approval by the State Water Board of the Project Funds.

SECTION 2. The reasonably expected maximum principal amount of the Project Funds is $50,000,000.

SECTION 3. This Resolution is being adopted no later than 60 days after the date on which the Agency will expend moneys for the construction portion of the Project costs to be reimbursed with Project Funds.

Attachment D

Page 2 of 2 ends

SECTION 4. Each Agency expenditure will be of a type properly chargeable to a capital account under general federal income tax principles.

SECTION 5. To the best of our knowledge, this Agency is not aware of the previous adoption of official intents by the Agency that have been made as a matter of course for the purpose of reimbursing expenditures and for which tax-exempt obligations have not been issued.

SECTION 6. This resolution is adopted as official intent of the Agency in order to comply with Treasury Regulation §1.150-2 and any other regulations of the Internal Revenue Service relating to the qualification for reimbursement of Project costs.

SECTION 7. All the recitals in this Resolution are true and correct and this Agency so finds, determines and represents.

SECTION 8. Authorize the Chief Deputy City Clerk to make minor changes herein to address clerical errors, so long as substantial conformance of the intent of this document is maintained. In doing so, the Chief Deputy City Clerk shall consult with the City Manager and City Attorney concerning any changes deemed necessary.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Santa Maria held on the 17th day of November 2026.

ATTEST:

Chief Deputy City Clerk
Mayor
APPROVED AS TO FORM:
_______________________________
City Attorney
APPROVED AS TO CONTENT:
_______________________________
Department Director
_______________________________
City Manager
Central Coast Regional Water Quality Control Board
February 5, 2026
Shad Springer, Director of Utilities
City of Santa Maria — Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:

TIME SCHEDULE ORDER R3-2026-0009
This letter transmits Time Schedule Order R3-2026-0009 for the City of Santa Maria’s (Santa Maria) wastewater treatment plant. The Time Schedule Order is effective on the date it is signed and requires Santa Maria to comply with the interim biochemical oxygen demand, total suspended solids, and total nitrogen effluent limitations presented in Time Schedule Order R3-2026-0009 no later than September 30, 2034. Santa Maria must continue to comply with General Waste Discharge Requirements Order R3- 2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day.

The Central Coast Water Board prepared and posted a Public Notice of the draft Time Schedule Order R3-2026-0009 for public consideration from December 30, 2025 through January 30, 2026. The Central Coast Regional Water Quality Control Board (Central Coast Water Board) did not receive any comments on the draft Time Schedule Order R3-2026-0009.

Please see Time Schedule Order R3-2026-0009 (attached) for detailed requirements, including, but not limited to specific tasks and due dates, and semiannual progress reports due August 1 and February 1 of each year. The first semiannual Time Schedule Order progress report is due August 1, 2026.

If you have any questions, please contact Cecile Blancarte at (805) 542-4789 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

Attachment E
City of Santa Maria WWTP - 2 - February 5, 2026
Sincerely,
for Ryan E. Lodge
Executive Officer
Attachment: Time Schedule Order R3-2026-0009
cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Chrisos Stoyos, City of Santa Maria, [email protected] Michelle Yankee, City of Santa Maria, [email protected] Graham Juby, Carollo, [email protected]
Lydia Holmes, Carollo, [email protected]
Rajesh Doppalapudi, Carollo, [email protected]
Rosemary Smud, Carollo, [email protected]
Jason Johnston, Santa Barbara County, [email protected] Angela Schroeter, Central Coast Water Board, [email protected] Sophie Froelich, Central Coast Water Board, [email protected] Kelsey DeLong, Central Coast Water Board, [email protected] Todd Stanley, Central Coast Water Board, [email protected] Tamara Anderson, Central Coast Water Board, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
ECM/CIWQS = CW-255678
GeoTracker = GT-WDR100029526
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant, Time Schedule Order
R:\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\8_TSO\Final\coverletter_TSO.docx

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 1: Executive Summary
FINAL / October 2026
Attachment F

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 1: Executive Summary
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.28 09:43:43-07'00'
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 1/ES.docx Master Plan Table of Contents
Volume 1 Executive Summary
Volume 2 Basis of Planning
Volume 3 Wastewater Characterization and Process Modeling Volume 4 Existing Facilities Condition Assessment
Volume 5 Wastewater Collection System
Volume 6 Liquid Treatment Approach for Addressing General Order Volume 7 Water Reuse and Liquid Disposal
Volume 8 Biosolids Handling and Disposal
Volume 9 Energy Management
Volume 10 Air Quality and Emissions Odor Control
Volume 11 Capital Improvement Program and Implementation Volume 12 Funding Opportunities
Volume 13 Support Facilities
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Contents

EXECUTIVE SUMMARY
ES.1 What Was Learned ES-1
ES.2 Outcomes & Impacts ES-2
ES.3 Recommendations & Next Steps ES-2
ES.4 Preliminary Timeline and Budget ES-3
ES.5 Summary of the Master Plan ES-4
ES.6 Guide to the Wastewater Master Plan Volumes ES-5
ES.6.1 Volume 1 – Executive Summary ES-5
ES.6.2 Volume 2 – Basis of Planning ES-5
ES.6.3 Volume 3 – Wastewater Characterization and Process Modeling ES-5 ES.6.4 Volume 4 – Existing Facilities Condition Assessment ES-5 ES.6.5 Volume 5 – Wastewater Collection System ES-6
ES.6.6 Volume 6 – Liquid Treatment Approach for Addressing General Order ES-6 ES.6.7 Volume 7 – Water Reuse and Liquid Disposal ES-6
ES.6.8 Volume 8 – Biosolids Handling and Disposal ES-6
ES.6.9 Volume 9 – Energy Management ES-7
ES.6.10 Volume 10 – Air Quality, Emissions, and Odor Control ES-7 ES.6.11 Volume 11 – Capital Improvement Program and Implementation ES-7 ES.6.12 Volume 12 – Funding Opportunities ES-8
ES.6.13 Volume 13 – Support Facilities ES-8
Tables
Table ES.1 Budget Summary for Short-Term CIP Implementation Through 2036 ES-4 Figures
Figure ES.1 Planning Level Schedule for Short-Term Projects ES-3 VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
City City of Santa Maria
CIP Capital Improvement Program
CWSRF California Clean Water State Revolving Fund
O&M operations and maintenance
WIFIA Water Infrastructure Finance and Innovation Act
WWTP wastewater treatment plant
VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-1

EXECUTIVE SUMMARY
The City of Santa Maria (City) must ensure its wastewater treatment system continues to protect public health, the environment, and groundwater while supporting a growing community. The last major plan was completed decades ago, and since then:
 New State regulatory requirements have been issued, including far stricter water quality limits. The City has secured a time extension until 2034 to implement improvements to the wastewater treatment plant (WWTP) which are required to meet the stricter water quality limits.  Wastewater strength has increased, leading to higher organic and nutrient (nitrogen) loading, because water conservation has resulted in lower water use per person.  Critical infrastructure is aging, with structures built as far back as the 1960s now approaching the end of their useful life.
 Population and economic growth will increase the quantity and strength of wastewater the City must treat through 2060.
 Receiving septage is critical to the region since the City is one of the last remaining WWTPs to receive and treat septage from residential, commercial, and industrial users.

This Master Plan provides a clear, long-term roadmap—spanning almost 35 years—to ensure the WWTP remains reliable, compliant, and capable of serving the community into the future.

ES.1 What Was Learned

1. The regulatory bar is rising significantly:

The City is now operating under a new statewide permit that sets much stricter limits on what can be released to groundwater, including a new limit on the total nitrogen content. Meeting these standards requires new treatment technology that the existing plant cannot provide.

2. Current facilities cannot meet future needs:

Several major treatment components are at or near their capacity due to increased organic loading caused by higher-strength wastewater. Even without population growth, the existing plant cannot meet regulatory requirements. Many critical structures are 40 to 60 years old and require rehabilitation or replacement to continue functioning safely.

3. Capacity increases are needed to keep pace with growth:

Projections show that Santa Maria’s flows and loads will exceed the plant’s design capacity by the early 2030s. Two future upgrades (Phase 1 and Phase 2) will be required to provide reliable treatment through 2060.

4. The best long-term solution is to stay at the existing site:

After evaluating multiple options—including a full relocation to a new site—the City determined that building the required new treatment facilities at the current WWTP is the most cost-effective, least disruptive, and operationally efficient path.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-2

5. A modern treatment process is needed:

Many alternatives were considered, and several options were tested in both the field and laboratory to verify treatment performance with the City’s wastewater. An organics-and-nitrogen-removal treatment system (the "Bardenpho" process) was identified as the alternative that reliably meets upcoming regulations while providing long-term operational flexibility and the lowest lifecycle cost.

ES.2 Outcomes & Impacts
Protecting Public Health and the Environment
 Ensures compliance with strict groundwater protection requirements.  Reduces nutrients (like nitrogen) and other constituents that can impact aquifers.

Maintaining a Reliable Essential Service
 Replaces aging infrastructure before failure occurs.
 Delivers a modern, efficient system that can reliably serve the community for decades.

Supporting Economic Growth
 Provides treatment capacity so homes, businesses, and industries can continue to grow without service constraints.

Improving Energy Efficiency and Resilience
 Includes on-site renewable energy generation and biogas recovery to reduce long-term operating costs.

Responsible Use of Ratepayer Funds
 Selects the most cost-effective solution after evaluating multiple options.  Aligns project phasing with financial capacity and available state/federal low-interest loans.

Limitations & Considerations
 Project cost is substantial and will require phased investments through 2060.  Construction must occur while the current plant stays in service, which adds complexity.  Future regulations may evolve, requiring flexibility in design and space for future treatment upgrades.
 Decisions on continued acceptance of septage have operational and financial implications for local haulers and the City.

ES.3 Recommendations & Next Steps
The Master Plan has identified Short-, Medium-, and Long-Term projects to satisfy the infrastructure needs through 2060. The following Short-Term projects are recommended for completion over the next 10 years:

1. Construct new percolation ponds:

These are needed to enhance disposal capacity and support future treatment changes.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-3

2. Move forward with Phase 1 WWTP upgrades:

Phase 1 provides new treatment facilities sized to meet regulatory deadlines and support the community through approximately 2052. This is the most urgent component of the plan and is a critical requirement to meet the new permit and timeline.

3. Rehabilitate existing aging infrastructure:

Address priority repairs that must occur before Phase 1 comes online.

In parallel with completing of the Short-term projects, the City should also do the following:
 Pursue state and federal low-interest financing.

The City should continue advancing Water Infrastructure Finance and Innovation Act (WIFIA) and State Revolving Fund loan applications to reduce the financial burden on ratepayers.  Engage the community.

Because wastewater projects are large, long-term investments, transparent communication with residents and elected officials is essential—particularly around timing, costs, and benefits.

ES.4 Preliminary Timeline and Budget
A planning-level schedule outlining the implementation of Short-Term projects to address immediate WWTP performance needs, the design and construction of new percolation ponds, and the Phase 1 upgrade is shown in Figure ES.1. The schedule is preliminary, and the City will strive to accelerate portions of the work to meet regulatory deadlines or seek regulatory time extensions as appropriate.

Figure ES.1 Planning Level Schedule for Short-Term Projects VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-4
The budget for the Short-Term capital improvements work developed through the master planning process is shown in Table ES.1.

Table ES.1 Budget Summary for Short-Term CIP Implementation Through 2036 Short-Term Project Description Budget Cost
Percolation Pond Expansion Build 46 acres of new percolation ponds on City-owned property east of Black Road
$76 million
Plant Rehabilitation Replace aging infrastructure at the existing plant $3 million Phase 1 WWTP Upgrade Build a new WWTP System at the existing WWTP Site to comply with the new State regulatory requirements
$536 million
ES.5 Summary of the Master Plan
This Master Plan lays out a clear path to modernize Santa Maria’s WWTP so that it remains safe, reliable, environmentally responsible, and financially sustainable through 2060. The recommendations in this plan strengthen the City’s ability to protect public health and local groundwater, meet new state regulatory requirements, and replace aging infrastructure before problems occur.

By investing in these improvements now, the City positions the community for long-term success— ensuring that future homes, businesses, and industries can continue to grow without service limitations.

The plan also reflects the City’s commitment to using ratepayer dollars responsibly by selecting cost-effective solutions and aligning major projects with available state and federal funding opportunities.

Overall, this Master Plan provides a forward-looking strategy to maintain a critical public service, safeguard environmental resources, and support the community’s needs for decades to come.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-5
ES.6 Guide to the Wastewater Master Plan Volumes
Each Volume of the Master Plan is summarized at a high level in this section. The purpose is to provide the reader with a reference guide to help find specific details.

ES.6.1 Volume 1 – Executive Summary
Purpose: Provides a high-level summary of the work performed, outcomes, and next steps.

What it covers: Focused Executive Summary of the 13 Volume WWTP Master Plan.

Use this volume if you want: A quick understanding of the work performed and the anticipated next steps.

ES.6.2 Volume 2 – Basis of Planning
Purpose: Establishes the planning framework, foundational assumptions, and approach used for the entire Master Plan.

What it covers: Planning horizon to 2060, service area, environmental setting and land uses, regulatory requirements, population, and assumptions for development of wastewater flows and loads, climate change adaptation, and the basis used to develop cost estimates used across subsequent volumes.

Use this volume if you want: An understanding of the foundational assumptions and framework that guide the analysis throughout the Master Plan.

ES.6.3 Volume 3 – Wastewater Characterization and Process Modeling Purpose: Defines the quality and strength of wastewater entering the system and evaluates how treatment processes perform under current and future conditions.

What it covers: Flow and loading characteristics, wastewater sampling data, modeling of treatment processes, projected changes in influent flow and load, and performance expectations for alternative treatment systems.

Use this volume if you want: Detailed information about the constituents of the wastewater, historical performance data, and the basis for developing the initial process models.

ES.6.4 Volume 4 – Existing Facilities Condition Assessment Purpose: Documents the physical and operational condition of existing infrastructure and remaining useful life.

What it covers: Structural evaluations, equipment age and reliability, capacity constraints, maintenance issues, and identification of critical assets needing repair or replacement, as well as which of the existing facilities/structures have potential for use in the next 20 to 40 years.

Use this volume if you want: A comprehensive look at current wastewater treatment facilities, their condition and remaining useful life, and a list of interim projects required to maintain plant performance until the new plant is operational.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-6
ES.6.5 Volume 5 – Wastewater Collection System
Purpose: Provides a high-level overview of the City’s sewer collection system that transports wastewater to the treatment plant.

What it covers: System layout, description of the existing septage receiving station, and major trunk lines entering the treatment plant.

Use this volume if you want: Information on sewer collection system layout, location of major trunk sewers, the existing septage receiving station, and the City’s Sewer System Management plan (in the Appendix). This volume does not include a detailed analysis of the collection system condition, its hydraulic capacity, or any limitations that will need to be addressed. The City is undertaking a separate, more detailed assessment of the sewer collection system to make such determinations.

ES.6.6 Volume 6 – Liquid Treatment Approach for Addressing General Order Purpose: Presents the detailed evaluation of treatment technologies and approaches to meet the requirements of the State's General Order for groundwater protection, for the flows and loads established in Volume 2.

What it covers: Regulatory requirements, development of process alternatives, technology screening and evaluation, technical evaluation of short-listed alternatives, preliminary siting and layout configurations, development and comparison of capital, operations, and maintenance (O&M) costs, and selection and preliminary layout of the preferred treatment strategy.

Use this volume if you want: A clear explanation of the methodology used to develop and evaluate alternative treatment configurations and sites for the new treatment plant to meet future regulatory standards, and why the chosen technology was selected.

ES.6.7 Volume 7 – Water Reuse and Liquid Disposal
Purpose: Identifies strategies for managing treated wastewater, including water reuse and the current approach of disposal via percolation ponds.

What it covers: Detailed evaluation of water reuse and development of alternatives for local agriculture and urban irrigation use, existing percolation pond percolation rates and history of performance, soils investigations, percolation pond water balance, percolation pond capacity, and long-term maintenance needs and costs to sustain percolation rates.

Use this volume if you want: Insight into where the treated water goes and why the disposal method will remain percolation ponds for the foreseeable future.

ES.6.8 Volume 8 – Biosolids Handling and Disposal
Purpose: Examine in detail alternatives for treating and disposing of solids produced during the wastewater treatment process.

What it covers: Existing and future biosolids disposal regulations, anticipated biosolids production from the alternative liquid stream treatment approaches, hauling and disposal alternatives and costs, and the recommended level of biosolids treatment.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-7
Use this volume if you want: Information about the current and future biosolids production, biosolids treatment and disposal strategies for the short-listed liquid treatment configurations, annual cost estimates, and the decision to maintain production of Class B biosolids for disposal for long-term sustainability.

ES.6.9 Volume 9 – Energy Management
Purpose: Analyze current and future energy needs, evaluate the potential for renewable energy use at the treatment plant, including beneficial use of biogas (digester gas), and recommend a suitable approach for the new treatment plant configuration.

What it covers: Current energy consumption, anticipated biogas production, life-cycle cost analyses, evaluation of multiple energy management approaches, including on-site power generation options, biogas utilization, and strategies for reducing long-term energy costs, including evaluation of a micro-grid.

Use this volume if you want: Details on how the plant can become more energy-efficient and reduce its reliance on PG&E power.

ES.6.10 Volume 10 – Air Quality, Emissions, and Odor Control Purpose: Assesses the plant’s air emissions profile and identifies strategies to manage odors and meet air permitting requirements, and presents a preliminary permitting plan for the new plant.

What it covers: Sources of odors and emissions, federal, state, and local air quality regulations, mitigation technologies, and recommended odor and emission control upgrades for the short and long-term to minimize community and regulatory impacts; in addition to a permitting plan which identifies anticipated permitting needs and timing for the new treatment plant.

Use this volume if you want: Information about air permitting, odor concerns, strategies to protect community air quality, which permit requirements have been identified, and the anticipated timeframe for obtaining such permits.

ES.6.11 Volume 11 – Capital Improvement Program and Implementation Purpose: Outlines the recommended projects, sequencing, and schedules to implement the Master Plan through 2060, and discusses alternatives for project delivery.

What it covers: Short-, medium-, and long-term project implementation periods, capital project descriptions, a preliminary implementation schedule through 2038, a tabular summary of the overall Capital Improvements Program through 2060, and the projected annual capital outlay by fiscal year through completion of the Phase 1 Project. Project delivery methods are analyzed in detail, and recommendations are given for the preferred approach to delivering the Phase 1 Project.

Use this volume if you want: A roadmap for what will be built and when, including cost and annual outlay expectations, and the proposed project delivery method for the Phase 1 Project.

VOLUME 1 / EXECUTIVE SUMMARY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ES-8
ES.6.12 Volume 12 – Funding Opportunities
Purpose: Provides details of current funding mechanisms that the City could pursue to assist with funding for the CIP.

What it covers: Federal and state funding opportunities, descriptions of each, typical loan or grant amounts, deadlines and constraints, recommended preferred funding approaches and timelines, general loan application timelines, and typical reporting requirements.

Use this volume if you want: Information about the funding programs (such as California Clean Water State Revolving Fund [CWSRF] and WIFIA) that the City is considering and how their timing works relative to the Phase 1 Project.

ES.6.13 Volume 13 – Support Facilities
Purpose: Addresses improvements needed for buildings, site infrastructure, and non-process systems that support the WWTP operations both now and in the future.

What it covers: Plant water systems and a proposed new Utility Water system, plant drainage and stormwater management, instrument air and propane facilities, the Utility building, Maintenance facilities, Administrative building and laboratory needs, and an evaluation of alternatives for upgrading the septage receiving area and treatment facilities.

Use this volume if you want: Information about the supporting systems and facilities that keep the plant operational beyond the treatment processes, and the proposed modifications to improve the septage handling and its impact on the treatment plant.

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 2: Basis of Planning
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 2: Basis of Planning
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:11:05-07'00'
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 3/Ch01 Contents
CHAPTER 1 INTRODUCTION/PLANT HISTORY

1.1 Purpose 1-1

1.2 Plant History 1-1

1.3 Master Plan Drivers 1-4

1.4 Goals and Objectives 1-5

1.5 Master Plan Organizational Structure 1-5
CHAPTER 2 PARTNERS, STAKEHOLDERS, AND SERVICE AREA

2.1 Location and Service Area 2-1

2.1.1 Climate/Geography 2-1

2.1.2 Service Area 2-2

2.2 Relevant Stakeholders 2-4

2.3 Consolidation 2-4

2.4 Laguna County Sanitation District Agreement 2-6

2.5 Land Acquisition, Leases, and Property 2-7

2.6 Conclusion 2-11
CHAPTER 3 ENVIRONMENTAL SETTING AND LAND USES

3.1 Introduction 3-1

3.1.1 Environmental Impact Reports 3-1

3.2 Land Use 3-3

3.2.1 City Land Use 3-3

3.2.2 WWTP Property Land Use 3-6

3.3 Preliminary Resource Analyses 3-7

3.3.1 Biological Resources 3-7

3.3.2 Cultural Resources 3-8
CHAPTER 4 REGULATORY REQUIREMENTS

4.1 Introduction 4-1

4.2 Water Quality 4-1

4.2.1 Regulatory Setting and Overview 4-1

4.2.2 Current Regulations and Practices 4-3

4.2.3 Future Regulations 4-7

4.2.4 Treatment Implications 4-11

4.3 Biosolids and Solids Handling 4-11

4.3.1 Regulatory Setting and Overview - Solids Handling 4-11

4.3.2 Current Regulations and Practices 4-16

4.3.3 Future Biosolids Regulations 4-22

4.3.4 Treatment Implications 4-24
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii

4.4 Air Quality 4-24

4.4.1 Regulatory Setting and Overview - Air Quality 4-24

4.4.2 Current Criteria Pollutant Regulations 4-27

4.4.3 Current Hazardous Pollutant Regulations 4-28

4.4.4 Current Climate Change Regulations 4-30

4.4.5 Current Practices 4-31

4.4.6 Future Air Quality Regulations 4-33

4.4.7 Treatment Implications 4-33

4.5 Water Reuse 4-34

4.5.1 Regulatory Setting and Overview - Water Reuse 4-34

4.5.2 Current Water Reuse Regulations 4-34

4.5.3 Current Practices 4-37

4.5.4 Treatment Implications 4-37

4.6 Key Takeaways 4-38
CHAPTER 5 POPULATION, LOADING, AND FLOW REQUIREMENTS

5.1 Purpose 5-1

5.2 Background 5-1

5.2.1 Master Plan Basis 5-2

5.2.2 Assumptions 5-2

5.3 Population 5-2

5.3.1 Historic Population 5-3

5.3.2 Projected Population 5-3

5.4 Service Area Land Use 5-4

5.5 Wastewater Flows 5-4

5.5.1 Wastewater Flow Components 5-4

5.5.2 Historic Flows 5-5

5.5.3 Peak Flows 5-6

5.5.4 Modeled Flow Scenarios 5-9

5.5.5 Wastewater Flow Factors 5-10

5.5.6 Buildout Determination 5-10

5.5.7 Wastewater Flow Projections 5-11

5.5.8 Contributing Agency Flows 5-11

5.5.9 Total Flows 5-12

5.6 Wastewater Loads 5-13

5.6.1 Carbonaceous Biochemical Oxygen Demand/Biochemical Oxygen Demand Ratio 5-13

5.6.2 Historic Loading Characteristics 5-13

5.6.3 Contributing Agency Loads and Septage 5-15

5.7 Water Reuse/Disposal 5-16

5.8 Loading Projections 5-17

5.8.2 Projected Concentrations 5-19

5.9 Basis of Design/Summary 5-21

5.9.1 Timing for Plant Expansions to 2060 5-22
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
CHAPTER 6 BASIS OF COST ESTIMATES AND FINANCIAL PLANNING

CONSIDERATIONS

6.1 Purpose 6-1

6.2 Background 6-1

6.3 Level of Accuracy 6-1

6.4 Operations and Maintenance Costs 6-1

6.5 Capital Costs 6-2

6.6 Life-Cycle Costs 6-3
Appendices
APPENDIX A 1948 HISTORICAL AERIALS
APPENDIX B 1967 HISTORICAL AERIALS
APPENDIX C 1981 HISTORICAL AERIALS
APPENDIX D 2006 HISTORICAL AERIALS
APPENDIX E 2016 HISTORICAL AERIALS

APPENDIX F BIOLOGICAL RESOURCES MEMO

APPENDIX G BASIN PLAN OBJECTIVES

APPENDIX H SANTA MARIA UPDATED NOTICE OF APPLICABILITY AND MONITORING AND

REPORTING PROGRAM

APPENDIX I TIME SCHEDULE COMPLIANCE PLAN

APPENDIX J GROUNDWATER MONITORING

APPENDIX K TDS SOURCE WATER IMPROVEMENT STUDY

APPENDIX L TIME SCHEDULE ORDER

APPENDIX M CLIMATE CHANGE ADAPTATION PLAN

APPENDIX N POTENTIAL FUTURE REGULATIONS FOR PERCOLATION POND OPERATION

APPENDIX O CITY OF SANTA MARIA RESIDENTIAL ORGANIC RECYCLING PROGRAM BROCHURE APPENDIX P CITY OF SANTA MARIA 2018 ANNUAL EPA SLUDGE REPORT APPENDIX Q STATEWIDE GENERAL COMPOSTING PERMIT (ORDER WQ201-0121-DWQ)

APPENDIX R SIGNIFICANT INDUSTRIAL USERS

APPENDIX S PERCOLATION PONDS
APPENDIX T AACE INTERNATIONAL RECOMMENDED PRACTICE NO. 18R-97 Tables
Table 1.1 Update to the Master Plan Volumes 1-5
Table 2.1 Relevant Stakeholders 2-4
Table 3.1 Land Use Percentages - 2020 3-3
Table 3.2 Current Land Uses in WWTP Area 3-7
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Table 4.1 City WWTP Interim Effluent Limitations (until June 16, 2025) and Historical Water Quality 4-4
Table 4.2 City WWTP Final Effluent Limitations (After June 16, 2025) 4-4 Table 4.3 Upper Guadalupe Groundwater Basin Options for Final Compliance (After June 16, 2025) 4-6
Table 4.4 Interim and Final Compliance Limits for BOD, TSS, and Total Nitrogen - Time Schedule Order (February 2026) 4-6
Table 4.5 Constituents of Interest for Future Regulations 4-7 Table 4.6 Summary of Solids and Biosolids Regulatory Agencies and Regulations 4-13 Table 4.7 State Permit (2004-0012-DWQ) - Biosolids Limits (Metals) 4-19 Table 4.8 State Permit (2004-0012-DWQ) - Biosolids Limits (Pathogens) 4-19 Table 4.9 Summary of Air Quality Regulatory Agencies and Requirements 4-26 Table 4.10 GHG Emissions Threshold for Reporting Years 2011 and Beyond 4-31 Table 4.11 Santa Maria Permit Potential to Emit Limits - Tons Per Year 4-32 Table 4.12 Flares and Boiler No. 1 Permitted Flows 4-32 Table 4.13 Summary of Water Reuse Regulatory Agencies, Legislation, and Requirements 4-34
Table 4.14 Title 22 Groundwater Recharge via Subsurface Injection Requirements for Potable Reuse 4-36
Table 4.15 Summary of Regulatory Requirements 4-38
Table 5.1 Historical and Projected Population Growth 5-3 Table 5.2 2020 Santa Maria Land Use 5-4
Table 5.3 Wastewater Collection System Commonly Used Terminology 5-5 Table 5.4 2020 Historical Flows Per Capita 5-5
Table 5.5 Daily Average Monthly Maximum Flows From 2018-2023 5-6 Table 5.6 Peak Hourly Monthly Maximum Flows From 2018-2023 5-8 Table 5.7 Sewer to Water Usage Factors With 2020 Water Consumption Data 5-9 Table 5.8 Flow Reduction Scenarios for Projection Modeling 5-10 Table 5.9 30-Day Maximum Peaking Factors for Wastewater Characteristics 5-14 Table 5.10 Septage Loading Characteristics 5-15
Table 5.11 Per Capita Loading Characteristics From 2018-2020 5-17 Table 5.12 2060 Peak Loading Estimates 5-19
Table 5.13 2060 Concentrations Across Flow Scenarios 5-19 Table 5.14 Basis of Design for Average Loading and Flows to 2060 5-21 Table 5.15 Basis of Design for Peak Loading and Flows to 2060 5-22 Figures
Figure 1.1 Aerial View of the WWTP in 1949 1-1
Figure 1.2 Aerial View of WWTP in 1967 1-2
Figure 1.3 Aerial View of WWTP Taken in 1981 1-3
Figure 1.4 Aerial View of the WWTP Taken in 2006 1-3
Figure 1.5 Aerial View of the WWTP Taken in 2016 1-4
Figure 2.1 Location of Santa Maria Within the State of California 2-2 Figure 2.2 City Limits and Service Area 2-3
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
Figure 2.3 City of Guadalupe City Limits and WWTP Locations 2-5 Figure 2.4 Land Areas Adjudicated Between LCSD and Santa Maria WWTP 2-7 Figure 2.5 Existing Property Owned by the Santa Maria WWTP for Potential Use in Facility Expansion 2-8
Figure 2.6 Existing Easements and ROW Present Alongside Santa Maria Property Line 2-9 Figure 2.7 Existing Property Leased to Agro-Jal Enterprises 2-10 Figure 3.1 Land Areas Evaluated for Use as Part of the 2006 EIR 3-2 Figure 3.2 Land Use Planning Alternatives (2020 General Plan Update) 3-4 Figure 3.3 Zoning Map in Santa Maria 3-5
Figure 3.4 Santa Maria Property Line for WWTP Expansions 3-6 Figure 4.1 Map of County Ordinances 4-21
Figure 5.1 Existing Sewer Lines in the City of Santa Maria 5-1 Figure 5.2 Expected Population Growth to 2060 5-3
Figure 5.3 Average Monthly Flows to Santa Maria WWTP (2018-2022) 5-6 Figure 5.4 Maximum Observed Daily Average Flow per Month Into Santa Maria WWTP (2018-2023) 5-7
Figure 5.5 Maximum Observed Hourly Flow per Month Into Santa Maria WWTP (2019- 2023) 5-8
Figure 5.6 Flow Projections With Selected Scenarios 5-11 Figure 5.7 Flow Projections of Contributing Agency Flows 5-12 Figure 5.8 Total Flow Projections at Selected Scenarios (Including Contributing Agency Flows) 5-13
Figure 5.9 Historical Monthly Loading Characteristics 5-14 Figure 5.10 Net Percolation Into the Percolation Ponds 5-16 Figure 5.11 Projected Annual Loading Characteristics 5-18 Figure 5.12 Projected Annual TSS Concentrations Over Different Flow Scenarios 5-20 Figure 5.13 Projected Annual BOD5 Concentrations Over Different Flow Scenarios 5-20 Figure 5.14 Projected Annual BOD5 Concentrations Over Different Flow Scenarios 5-21 Figure 5.15 Trigger Curve for Phased Plant Expansions to 2060 Based on Flow 5-22 Figure 5.16 Trigger Curve for Phased Plant Expansions to 2060 Based on Load 5-23 VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1
Abbreviations
AAF annual average flow
AAL annual average load
AB Assembly Bill
ADC alternative daily cover
ADMMF average daily maximum month flow
ADMML average daily maximum month load
ADU accessory dwelling unit
ATC Authority to Construct
BOD biochemical oxygen demand
BOD5 5-day biochemical oxygen demand
BWF base wastewater flow
CAA Clean Air Act
CAAQS California Ambient Air Quality Standards
CalRecycle California Department of Resources Recycling and Recovery CAP Climate Action Plan
CARB California Air Resources Board
Carollo Carollo Engineers
CBOD carbonaceous biochemical oxygen demand
CCL Contaminant Candidate List
CCR California Code of Regulations
CDWF California Department of Wildlife
CEC constituents of emerging concern
Central Coast Basin Plan Water Quality Control Plan for the Central Coast Basin CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CFU colony forming unit
CH4 methane
City City of Santa Maria
CO carbon monoxide
CO2 carbon dioxide
CO2e carbon dioxide equivalent
CPI Consumer Price Index
CTR Regulation for the Reporting of Criteria Air Pollutants and Toxic Air Contaminants CWA Clean Water Act
CWEA California Water Environment Association
CWSRF Clean Water State Revolving Fund
DAC disadvantaged community
DBCM chlorodibromomethane
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2
DCBM bromodichloromethane
DDW Division of Drinking Water
degrees C degrees Celsius
degrees F degrees Fahrenheit
DLR Detection Limit for Purposes of Reporting
DPR direct potable reuse
DPS Distinct Population Segment
EIR Environmental Impact Reports
Engel & Gray Engel & Gray, Inc.

EPA United States Environmental Protection Agency
FEMA Federal Emergency Management Agency
GHG greenhouse gas
gpcd gallons per capita per day
gpd gallons per day
H2S hydrogen sulfide
HAA5 haloacetic acids
HFPO-DA hexafluoropropylene oxide dimer acid
HI Hazard Index
IPR indirect potable reuse
lb/day pounds per day
LCSD Laguna County Sanitation District
MCL maximum contaminant level
mg/kg milligrams per kilogram
mg/L milligrams per liter
mgd million gallons per day
mL milliliter
µg/L micrograms per liter
mL/L milliliters per liter
MLE Modified Ludzak-Ettinger
mmBTU metric million British thermal units
MND Mitigated 3Negative Declaration
MPN most probable number
MRP Monitoring and Reporting Program
mt metric tons
MTBE methyl tert butyl ether
N2O nitrous oxide
N/A not applicable
NAAQS National Ambient Air Quality Standards
ND non detect
ND Negative Declaration
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3
NDMA N-Nitrosodimethylamine
NESHAP National Emission Standards for Hazardous Air Pollutants NH3-N ammonia nitrogen
NL notification level
NOA Notice of Applicability
NOx nitrogen oxides
NPDES National Pollutant Discharge Elimination System
O&M operations and maintenance
OEHHA Office of Environmental Health Hazard Assessment
PCB polychlorinated biphenyls
PDWWF peak average daily wet weather flow
PF Public Facilities
PFAS per- and polyfluoroalkyl substances
PFBS perfluorobutanesulfonic acid
PFHxS perfluorohexane sulfonate
PFNA perfluorononanoic acid
PFOA perfluorooctanoic acid
PFOS perfluorooctane sulfonate
PFU plaque forming unit
PHWWF peak hourly wet weather flow
PM particulate matter
Porter-Cologne Act Porter-Cologne Water Quality Control Act POTW publicly owned treatment works
ppmv parts per million as volume
PTO Permit to Operate
RL reporting limit
RO reverse osmosis
ROW right-of-way
RWQCB Regional Water Quality Control Board
SB Senate Bill
SBCAG Santa Barbara County Association of Governments
SBCAPCD Santa Barbara County Air Pollution Control District scf standard cubic feet
SIU significant industrial user
SMR self-monitoring report
SOx sulfur oxides
SRF State Revolving Fund
State State of California
SWRCB State Water Resources Control Board
TAC toxic air contaminant
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4
TCLP Toxicity Characterization Leaching Procedure
TDS total dissolved solids
TKN total Kjeldahl nitrogen
TOC total organic carbon
TSCP Time Schedule Compliance Plan
TSO Time Schedule Order Time Schedule Order
TSS total suspended solids
TTHM total trihalomethane
USACE United States Army Corps of Engineers
VS volatile solids
Water Board Central Coast Regional Water Quality Control Board WDR waste discharge requirement
WIFIA Water Infrastructure Finance and Innovation Act
WQO water quality objective
WWTP wastewater treatment plant
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 INTRODUCTION/PLANT HISTORY

1.1 Purpose
The purpose of this Volume is to present the basis for development of the Wastewater Treatment Plant (WWTP) Master Plan for the City of Santa Maria (City). This Master Plan has a planning horizon to 2060 (35 years) and will discuss the parameters that will define the upgrades to the City's WWTP.

Chapter 1 of the Basis of Planning Volume outlines the goals and objectives for the update of the Master Plan and presents the organizational structure of the update to the Master Plan Volumes.

1.2 Plant History
The City is responsible for the collection and treatment of wastewater flows generated within the City. It also accepts septage from customers and community members, and treats flows through swap agreements with the neighboring Laguna County Sanitation District.

The City has historically seen expansions of its wastewater plant to accommodate a growing population.

Originally constructed in 1932, the plant has undergone multiple expansions, including in 1948, 1961, 1982, 1996, and 2008. The appendices include historical aerial photographs from each time period.

Prior to 1961, the plant operated with a three-stage treatment train process. The liquid process consisted of primary sedimentation followed by a biofilter, and then a secondary clarifier (this structure later became known as the intermediate clarifier). The removed sludge was stabilized in two anaerobic sludge digesters, before being deposited on sludge drying beds. Figure 1.1 shows an aerial view of the WWTP taken in 1949, and Figure 1.2 shows the plant in 1967.

Figure 1.1 Aerial View of the WWTP in 1949
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
In 1961, in response to a growing population, multiple additions were made to expand the plant's capacity. Two sets of biofilters (trickling filters) were constructed, along with two additional clarifiers, one primary and one secondary. In addition, a new sludge digester and thickener was installed as shown in Figure 1.2, which is an aerial view from 1967, which also shows additional sludge drying beds and ten percolation ponds to the west of the treatment facilities.

Figure 1.2 Aerial View of WWTP in 1967
In 1980, additional percolation ponds were developed behind the plant to allow for discharge of the treated effluent, and the earlier ponds were reconfigured. Eight larger ponds were constructed to accommodate annual average design flows of 6.5 million gallons per day (mgd). The ponds provided a discharge point for the liquid stream, and an additional level of treatment prior to reentry back into the groundwater system. Further, a new primary clarifier, grit chamber, and primary trickling filter were installed, as well as additional sludge drying beds. The plant began to recirculate its flow here, with the installation of primary and secondary trickling filter pump stations. In addition, site buildings such as the administration building, the primary sludge building, and the digester control building were constructed in this expansion.

Figure 1.3 shows an aerial view of the plant from 1981.

VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
Figure 1.3 Aerial View of WWTP Taken in 1981
In 1996, the plant was expanded once again to accommodate an average daily flow of 9.5 mgd. The expansion included the addition of a new headworks screening system, a new thickener, and upgrades to the pump stations, thickeners, and other piping. Further, additional percolation ponds and sludge beds were constructed. Figure 1.4 shows an aerial photograph taken in 2006.

Figure 1.4 Aerial View of the WWTP Taken in 2006
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Most recently, in 2008, the plant expanded again to its current configuration, with a design capacity to treat an average annual flow of 12.5 mgd. This 3 mgd expansion consisted of an additional primary clarifier, an additional primary tricking filter, an additional sludge digester, and a pump station for future percolation ponds. Upgrades to the headworks also proceeded here, with one additional bar screen and a grit screw added to the process. Figure 1.5 presents an aerial view of the plant taken in 2016.

Figure 1.5 Aerial View of the WWTP Taken in 2016
The appendices include additional historical aerial views of the WWTP and historical property boundary lines.

1.3 Master Plan Drivers
In June 2023, the City received a Notice of Applicability (NOA) from the Central Coast Regional Water Quality Control Board (Water Board) informing the City of their enrollment in Order No. R3-2020-0020, General Waste Discharge Requirements (WDR) for dischargers from domestic wastewater systems with flows greater than 100,000 gallons per day (gpd).

The NOA terminated the individual WDR that the City had previously been operating under; Order No. R3-2010-0001, and set out new, significantly more stringent effluent discharge requirements that will require major changes to the wastewater treatment process to reach compliance. More details are provided in Volume 2, Chapter 4.

In addition to the significant discharge permit requirements in the new General Order, the WWTP has seen an increase in organic load to the plant. So, while influent wastewater flow rates have not reached levels anticipated in the last plant expansion, likely due to water conservation measures, the solids and organic loads to the plant have increased.

VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
Overall, there are two major drivers for the Master Plan update. Firstly, the new General Permit effluent limits driving the need for new treatment technologies, and secondly a need to increase the plant capacity to cope with future organic and solids loads.

1.4 Goals and Objectives
The purpose of the update to the Master Plan is to evaluate the City's existing wastewater treatment system, and to provide a comprehensive update to meet the updated General Permit which the City is now operating under. The Master Plan will assess alternatives for the City regarding the expansion or new construction of the WWTP. The Plan will also make recommendations for near-term improvements, rehabilitation of the facilities, and develop financial rate structures and funding to finance the upgrades. It will provide the basis for eventual design of a new facility and assess regulatory requirements.

This Master Plan is based on a 35 year planning period to the year 2060. The update of the Master Plan will incorporate the findings and recommendations of previous and ongoing plans and studies. More specific goals for the update to the Master Plan include:
 Analyzing the Santa Maria WWTP and developing a Master Plan that:
» Complies with regulatory requirements, both in the near-term and into the future. » Does not overburden rate payers.
» Is equitable to the development community.
» Accommodates current and future growth demands of the City. » Addresses anticipated future regulatory and climatic changes.

1.5 Master Plan Organizational Structure
This Master Plan Update is organized into 12 separate volumes. Each volume title and chapter contents are listed in Table 1.1.

Table 1.1 Update to the Master Plan Volumes
Volumes and Chapter Titles
Volume 1: Executive Summary
Volume 2: Basis of Planning
Chapter 1: Introduction/Plant History
Chapter 2: Partners, Stakeholders, and Service Area
Chapter 3: Environmental Setting and Land Uses
Chapter 4: Regulatory Requirements
Chapter 5: Population, Loading, and Flow Requirements
Chapter 6: Basis of Cost Estimates and Financial Planning Considerations Volume 3: Wastewater Characterization and Process Modeling Chapter 1: Wastewater Characterization and Process Modeling Volume 4: Existing Facilities Condition Assessment
Chapter 1: Condition Assessment
Volume 5: Wastewater Collection System
Chapter 1: Wastewater Collection System
VOLUME 2 / CHAPTER 1: INTRODUCTION/PLANT HISTORY
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Volumes and Chapter Titles
Volume 6: Liquid Treatment Approach for Addressing General Order Chapter 1: Screening and Evaluation of Liquid Treatment Process Alternatives Chapter 2: Screening and Evaluation of Solids Treatment Alternatives Chapter 3: Preliminary Layout Considerations and Evaluation Chapter 4: Capital and O&M Cost Development
Chapter 5: Treatment Alternative Selection
Chapter 6: Project Description
Volume 7: Water Reuse and Liquid Disposal
Chapter 1: Recycled Water Feasibility Plan
Chapter 2: Effluent Disposal
Volume 8: Biosolids Handling and Disposal
Chapter 1: Biosolids Handling and Disposal
Volume 9: Energy Management
Chapter 1: Energy Management
Volume 10: Air Quality and Emissions Odor Control
Chapter 1: Air Quality Emissions
Chapter 2: Permitting Plan
Volume 11: Capital Improvement Program and Implementation Chapter 1: Capital Improvement Program and Implementation Chapter 2: Project Delivery
Volume 12: Funding Opportunities
Chapter 1: Funding
Volume 13: Support Facilities
Chapter 1: Plant Water Systems
Chapter 2: Plant Drainage and Stormwater
Chapter 3: Instrument Air and Propane
Chapter 4: Utility Building, Maintenance, and Laboratory Chapter 5: Septage Handling
VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
CHAPTER 2 PARTNERS, STAKEHOLDERS, AND SERVICE
AREA

2.1 Location and Service Area

2.1.1 Climate/Geography
The Santa Maria Valley is a large coastal basin in northwestern Santa Barbara County, California, nestled between the Solomon Hills to the south, the San Rafael Mountains to the southeast, the Sierra Madre Mountains to the east, and the Pacific Ocean to the west. Figure 2.1 depicts the location of the City within Santa Barbara County and the state of California.

The area's topography is generally flat with foothills of coastal ranges to the east and a projection of transverse foothills to the north. The geology of the area consists of Paso Robles and Careaga Sand at depths typically greater than 300 feet below mean sea level, Quaternary Alluvium at depths from approximately 50 feet below mean sea level, and dune sand at the surface.

Santa Maria is located in a temperate climate, with close proximity to the Pacific Ocean. The average annual rainfall is about 12 to 13 inches with a range of low annual temperatures of near 40 degrees Fahrenheit (degrees F) to annual average highs around 80 degrees F. The WWTP is located outside of the Federal Emergency Management Agency (FEMA) 100-year flood plain, and groundwater is often found at depths of 70 feet or more below the surface, which provides low likelihood of liquefaction. The area does contain a region of perched aquifers near the airport; however, to date, perched aquifers have not been recorded near the WWTP, although geotechnical investigations in and around the percolation ponds show the presence of clay lenses of various sizes and thicknesses. The Santa Maria River drains the valley and is formed at the confluence of the Cuyama and Sisquoc Rivers.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
Figure 2.1 Location of Santa Maria Within the State of California

2.1.2 Service Area
The City has a service area of roughly 23 square miles with an approximate population of 110,000 people.

The City's service area is generally characterized by residential, commercial, and industrial land uses with a wastewater quality reflecting these sources. The City owns and operates both a wastewater collection system and a wastewater facility to collect and treat wastewater within their service area. The collection system is almost exclusively gravitational and flows from the east to the WWTP on the west of the City (see Figure 2.2). A portion of the wastewater generated by the Orcutt community in the south is served by Laguna County Sanitation District (LCSD), under the County. The location of the Santa Maria WWTP and the Laguna County WWTP, along with the Santa Maria city limits, are depicted in Figure 2.2.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3
Figure 2.2 City Limits and Service Area
VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4

2.2 Relevant Stakeholders
Relevant stakeholders can vary greatly and represent numerous groups including, but not limited to, the City and their ratepayers, regulatory agencies, private businesses, neighboring communities, and jurisdictional authorities. These various groups are often represented through municipal departments and regional agencies that have a vested interest and role in the planning and expansion of the existing WWTP. The stakeholders anticipated to play a role in the master planning and capital improvement process are as shown in Table 2.1.

Table 2.1 Relevant Stakeholders
Partners and Stakeholders
City of Santa Maria Department of Utilities
City of Santa Maria Department of Public Works
Central Coast Regional Water Quality Control Board
Laguna County Sanitation District
State of California Department of Water Resources
Santa Maria City Council
Engel and Gray Composting, Inc.

Agricultural Community
Private Landowners and Businesses
Grease, Septic, and Septage Liquid Waste Handlers
Significant Industrial Users (SIUs)
City of Santa Maria Community Development Department
City of Guadalupe
Notes:

SIU - significant industrial user
It is important that the perspectives of these stakeholders are included in the planning process.

Accordingly, the City will host stakeholder meetings to keep stakeholders informed and obtain their input and feedback as the planning process develops.

2.3 Consolidation
The implications of consolidation are numerous with potential to significantly impact future capital projects for the City's wastewater collection and treatment facilities. In-depth analysis of plausible consolidation alternatives is currently beyond the scope of this Master Plan, however some discussion of this topic is merited given recent communications with the neighboring City of Guadalupe. The City of Guadalupe has received a suggestion from the Water Board that they consider pumping their roughly

0.5 mgd of wastewater to the Santa Maria WWTP for treatment, rather than treat it themselves. This has been communicated to the City and a data request was subsequently submitted to the City of Guadalupe to obtain flow and wastewater quality information to enable an analysis to be performed. To date, the requested data has not been received.

The challenges of consolidation are clear: it will increase operation and maintenance (O&M) costs and complexity, change wastewater characteristics, and would require legal proceedings associated with the VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5
consolidation. Further, the City's capital improvement plan would need to be revised to include the design and construction of all necessary collection and treatment improvements needed for the consolidation.

However, the positives of such a consolidation cannot be overlooked. The customer base would increase, drawing more revenue into the system and expanding the staffing pool for operations. The City of Guadalupe may improve funding prospects from federal and state sources due to their status as a disadvantaged community (DAC). Further, geographical proximity is a significant boon; the location of the current Guadalupe WWTP is only 6 miles east of the City (Figure 2.3). This proximity would reduce piping and land acquisition costs, while allowing for community coordination.

Figure 2.3 City of Guadalupe City Limits and WWTP Locations VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
In addition, the benefits of consolidation are important from a regulatory perspective. If both cities can maintain a single plant that has sufficient capacity to serve both communities, the regulatory burden will be centralized on one facility, reducing overall efforts to maintain regulatory compliance through the continual upkeep at the Guadalupe WWTP.

As mentioned in the beginning of this section, the possibilities for consolidation are numerous, and may not be limited to the City of Guadalupe. The LCSD, who already have flow agreements with the City (discussed in the next section), may also offer some type of consolidation potential. LCSD has recently expanded their WWTP in 2023/2024, and thus may have additional capacity to accept flows from Santa Maria, although a limitation that LCSD has is the capacity to discharge effluent. Current effluent discharge is limited by the number of reuse customers.

The interim consolidation potential for LCSD may best be considered from the City's perspective. If the City proceeds with expansion, some of their current flows in this interim period of construction could be sent to the LCSD plant to address potential issues with biochemical oxygen demand (BOD) loading in the interim phase until construction. Treated effluent would need to be returned to the City's percolation ponds for disposal, making this a less attractive option.

Further investigation and an expanded master plan into the potential benefits of consolidation for the City would be needed if future agreements with neighboring wastewater entities are to be pursued.

2.4 Laguna County Sanitation District Agreement
It is important for the context of this Master Plan to discuss the current agreement LCSD has with the City.

LCSD currently operates a WWTP about 4 miles south of the Santa Maria WWTP, adjacent to Black Road.

The current agreement, signed in 2017, will proceed in effect until 2057, barring any changes by either party. The agreement is meant to use sewer lines owned by either entity to optimize the effect of gravity flows to either site. In Figure 2.4, the areas highlighted as Exhibit A1 and Exhibit A2, both located in the Santa Maria city limits, send flow to LCSD. The area labeled as Exhibit B, which is within the LCSD service area, has its flow diverted to Santa Maria WWTP. It is anticipated in the future that the area shown in Exhibit A1 will eventually be incorporated into the Laguna County Service Area.

The locations of the Exhibits and the destination of their respective flows are subject to change pursuant to piping upgrades and developments. The existing agreement provides a legal basis to make changes. It is expected that some of the Exhibits and the flows from each will be changed based on future plant capacities and locations.

As a result of the agreement, the City receives about 0.2 mgd of net flow from Laguna County unincorporated areas at a cost of about $1.85 per 1,000 gallons in Fiscal Year 2021-2022.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7
Figure 2.4 Land Areas Adjudicated Between LCSD and Santa Maria WWTP The importance of this agreement and this coordination between the two districts provides a future basis for cooperation between the two agencies. Considering the existing network of sewer lines and the proximity of the two treatment plants, future increases of net flows may be an option as an interim or permanent approach for achieving effluent permit limits.

2.5 Land Acquisition, Leases, and Property
The City intends to minimize the annexation and purchase of additional property for the development of any wastewater plant expansion. As a result, it must maximize the current property it owns. Figure 2.5 below illustrates the current property owned by the Santa Maria WWTP for use in expansion of facilities.

It is important to highlight the right-of-way (ROW) established on Black Road. There exist multiple state facilities allocated to that corridor, including a fiber optic cable, and a 42-inch diameter State Water Project pipeline. The total ROW currently allotted to accommodate the projected future uses along this easement spans 110 feet. Currently, the California Department of Water Resources easement is slated at 30 feet, the fiber optic cable easement is at 20 feet, and the future Black Road ROW is set at 60 feet.

Figure 2.6 illustrates the easement area. Further, the City has discussed potential plans for a road-widening project at Black Road, and a potential expansion into a full arterial of the street. As such, future expansions must consider this development, along with access points into a potential new facility east of the existing plant, north of Stowell Road.

VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
Figure 2.5 Existing Property Owned by the Santa Maria WWTP for Potential Use in Facility Expansion VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
Figure 2.6 Existing Easements and ROW Present Alongside Santa Maria Property Line VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
Currently, the land area east of Black Road and north and south of Stowell Road, is leased by the City to Agro-Jal Farming Enterprises, as shown in Figure 2.7. The current lease extends to December 31, 2028, and considering potential construction and permitting activities, may be cancelled by the City with nine months' written notice. Additional time allotted to notification of the lease termination may be necessary to reduce the negative impacts on Agro-Jal. It will be critical to consider the existing lease agreements when beginning any construction scheduling.

Figure 2.7 Existing Property Leased to Agro-Jal Enterprises VOLUME 2 / CHAPTER 2: PARTNERS, STAKEHOLDERS, AND SERVICE AREA OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
The roughly 233 acres east of Black Road owned by the City should be adequate for any plant expansion, including additional percolation pond area, through the planning horizon of 2060. However, the concerns posed to any individual and corporate landowners surrounding the site are important to consider during the planning and design phases of the project, both now and into the future. Community engagement will be a core feature of this planning process to educate ratepayers on the need for any proposed improvements, and to minimize any impacts the construction will have on the surrounding community.

To assist with this the Master Planning process includes preparation of review documentation pursuant to the California Environmental Quality Act (CEQA), as well as the necessary environmental documentation to satisfy the requirements of the Clean Water State Revolving Fund (CWSRF) Program Operating Agreement between the United States Environmental Protection Agency (EPA) and the State Water Resources Control Board (SWRCB); called CEQA plus. Further details are presented in Volume 2, Chapter 3.

2.6 Conclusion
The success of this project moving forward is dependent on productive coordination across all relevant stakeholders. Spearheaded by the City, the consultation of multiple agencies and individuals across all stages of the planning and construction phase will allow for a solution that is satisfactory to all and achieves the objectives of the project well into the future.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-1
CHAPTER 3 ENVIRONMENTAL SETTING AND LAND USES

3.1 Introduction
The environmental setting and existing land use of Santa Maria is important to evaluate. Land use availability, future growth, and potential historical or archaeological sites may affect expansion and construction of the Santa Maria WWTP.

The available and existing land use of the Santa Maria WWTP property play a large factor in the constructability and the permitting process for any proposed plant expansion. Further, any archaeological, biological, and historical resources that may be identified within the designated land area of the plant may affect the construction activities on the site.

As noted in Volume 2, Chapter 2, this Master Planning process includes preparation of review documentation pursuant to the CEQA, as well as the necessary environmental documentation to satisfy the requirements of the CWSRF Program Operating Agreement between the EPA and the SWRCB; called CEQA Plus. Details are provided in Volume 13 – CEQA/Environmental Process. The following sections summarize previous Environmental Impact Reports (EIRs) and their impacts, summarize the existing biological resources in the project area, and give a general overview of land use in the City and in the property currently slated to accommodate the plant expansion.

3.1.1 Environmental Impact Reports
Under California state law, if a project may cause a significant and unavoidable environmental impact, an EIR is required. Within the EIR, alternatives to the development are analyzed, and possible mitigation efforts provided. If no impacts exist, a Negative Declaration (ND) or a Mitigated Negative Declaration (MND) may proceed, and the project will not require an EIR. In 2006, an EIR was developed for the 2008 plant expansion due to the unavoidable and unmitigable effect on land currently used for agriculture.

Figure 3.1 indicates the areas that were evaluated as part of the 2006 EIR.

As of 2025, most of the proposed facilities east of Black Road (percolation ponds, a corporate yard, and an impound yard) were not built. The sole proposed facility that was constructed was the Santa Maria campus of the Santa Barbara Humane Society, an animal shelter. The remainder of the unused land is used for agriculture. The Humane Society building was constructed in the area of the Impound Yard designation in Figure 3.1.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-2
Figure 3.1 Land Areas Evaluated for Use as Part of the 2006 EIR The following list indicates the adverse environmental impacts identified in the 2006 EIR:
 Agricultural Resources (Significant and Unavoidable):
» Loss of prime agricultural farmland with construction of wastewater facilities and structures.  Aesthetics (Significant but Mitigable):
» New structures obstructed views and introduced glare and light to a trafficked area.  Biological Resources (Significant but Mitigable):
» Potential disturbance and loss of habitat for the California red-legged frog.  Geology and Soils (Significant but Mitigable):
» High susceptibility to "ground shaking" in the area could destabilize slopes. » Erosive soils in the area are susceptible to increased erosion from construction.  Air Quality (Significant but Mitigable):
» Construction related particulate emissions would increase during construction.

The 2006 EIR presented feasible mitigation measures to counteract the environmental effect on each category. These mitigation proposals were to be implemented during plant construction, but as noted above, none of the facilities east of Black Road were constructed.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-3
The 2006 EIR provides a good platform for the current CEQA work that will again look at constructing new facilities east of Black Road.

3.2 Land Use

3.2.1 City Land Use
As described in Chapter 2 of this Volume, the City is located in northwestern Santa Barbara County in southern California. Per the 2020 Census, the City has a population of 107,000, and is known for its agricultural uses. As part of a comprehensive General Plan update sponsored by the City, the City outlines existing land use as a benchmark for future development. In this memorandum, updated in 2022, the following land use designations are presented. Note that the acreages and proportions are as of 2022 and are subject to change. Table 3.1 highlights the existing land-use percentages in the City allocated to each desired use. Figure 3.2 highlights the associated land-use categories overlaid on the City limits.

Table 3.1 Land Use Percentages - 2020
Land Use Type Existing Acreage(2) Percentage of City Total Residential 3,486 27.3
Commercial 948 7.4
Industrial 1,082 8.5
Airport 1,411 11.1
Public 1,408 11
Conservation and Agricultural 1,828 14.3
Other/Special(1) 2,589 20.3
Notes:
(1) Other indicates vacant or private right of way land. (2) Source is from the 2022 General Plan update.

In addition to the land uses presented above, Santa Maria had provided projections for possible development scenarios for the City. The three development scenarios are defined below:

1. Alternative A - Annexation:

City growth will proceed through annexation of neighboring land, and be illustrated through the continuation of existing outward growth patterns. Employment will proceed along existing employment centers near the US-101.

2. Alternative B - Infill:

City growth will proceed with an overhaul of existing zoning regulations and patterns, where higher density buildings and plots will proceed on existing City land. Employment growth will occur along existing centers, with higher-density units and plazas. No annexation or growth in land would occur in this alternative.

3. Alternative C - Hybrid:

City growth will proceed with a mix of zoning changes and annexation, where some land is annexed for employment and commercial centers, and where existing residential usage is densified with more permits and accessory dwelling unit (ADU) developments.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-4
Projections of the growth of each land use category were identified in the memorandum in the Santa Maria General Plan. Based on the alternatives defined above, Figure 3.2 indicates the total number of acres dedicated to each form of land use compared with the 2020 land use figures presented in Table 3.1.

As can be seen in Figure 3.2, across each alternative, an increase in residential acreage is expected. This means that more sewer connections and more land use will be designated for homes and domestic uses.

Note too, the increase in the allocation of industrial space for any future growth of employment centers across each projection. More agricultural/conservation space is also expected to accommodate any growth in the agricultural sector.

The data in Figure 3.2 also shows that commercial and public space will remain stagnant or decrease in land acreage due to density increases.

Figure 3.2 Land Use Planning Alternatives (2020 General Plan Update) Figure 3.3 shows the zoning map for the City, indicating where the various zones are located. Currently, the property owned by the City around the WWTP and the area to the east of Black Road is zoned as Public Facilities. As noted in Chapter 2, the area to the east of Black Road is currently leased to a local farming operation.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-5
Figure 3.3 Zoning Map in Santa Maria
VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-6

3.2.2 WWTP Property Land Use
The existing WWTP occupies most of the area within the City's property line to the west of Black Road, as indicated in Figure 3.4. Moving forward the City will, at a minimum, need to expand the percolation pond area and potentially other treatment facilities to the east of Black Road, which is currently used for agriculture.

Figure 3.4 Santa Maria Property Line for WWTP Expansions VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-7
The WWTP expansion will likely take place primarily in the area north of West Stowell Road. The total property area on both sides of Black Road is 461.12 acres, encompassed by the yellow solid lines in Figure 3.4. Note that the property boundary extends a little further south of Stowell Road than is shown in Figure 3.4.

Table 3.2 indicates the areal use and land cover types for the property site.

Table 3.2 Current Land Uses in WWTP Area
Vegetation / Land Cover Type(1) Acreage(2)
Irrigation Ditch 0.91
Disturbed 18.7
Agricultural Row Crop 220
Developed 222
Total 461
Notes:
(1) Adapted from LSA Consultant Memorandum (Table A, Appendix F). (2) Acreages are approximate and based on geographic information system measurements.

In addition, the WWTP property is characterized by flat, cultivated agricultural lands. The Santa Maria Valley is underlain by a groundwater basin that experiences groundwater flow from a west to southwest direction. There exists a seismic fault called the Casmalia fault approximately 4.5 miles south of the site.

As noted, the site is currently zoned as Public Facilities (PF). However, due to the leasing agreements, the area to the east of Black Road is currently utilized as Agriculture, and is leased by Agro-Jal Farming Enterprises. Note that the area directly surrounding the City property to the east and west is outside city limits.

The soils in the area, as represented by the memorandum in Appendix F, are classified primarily by sandy loam to loamy sand. Table B in Appendix F provides more information on soil areas.

3.3 Preliminary Resource Analyses

3.3.1 Biological Resources
As part of the master planning effort, a preliminary analysis of biological resources within the existing property line of the WWTP was completed by LSA Associates, Inc. An important objective of the survey was to provide a baseline understanding of the resources in the project area, and to identify any "special-status" species under existing laws that may affect construction of new facilities.

The memorandum provides a biological survey of the site location to document the potential presence of sensitive biological resources. Biological resources include soils, plant and animal species, along with habitat for potentially endangered species. It also includes an analysis of areas within the project site that may be subject to regulatory actions.

The memorandum is included in Appendix F and summarized below.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-8

3.3.1.1 Memorandum Summary
LSA completed a literature review and a field survey of the designated WWTP project area.

The survey indicated the following:
 The project site may support nine special-status animal species and nesting birds within the project site due to the presence of suitable habitat for those species.  The project site does not support special-status plant species or sensitive natural communities.  The project site does not support critical habitat or wildlife movement corridors, and construction activities will not impede any corridors.
 WWTP treatment ponds are not considered to be jurisdictional aquatic resources. As a result, they are exempt from existing United States Army Corps of Engineers (USACE) and California Department of Wildlife (CDFW) regulations. However, they may be included in the regulations highlighted in the Porter-Cologne Act.
 There are no protected trees located within the project site, in accordance with City of Santa Maria General Plan Policy 3.

Completed mitigation and impact analyses for biological resources will proceed later to support the CEQA review process once the details of design and construction are finalized.

A list of the special status species is shown here:

1. California tiger salamander (Ambystoma californiense) - Santa Barbara County Distinct Population Segment (DPS) 2 – federally endangered and state listed as threatened.

2. California red-legged frog (Rana draytonii) - federally threatened and CDFW Species of Special Concern.

3. Western spadefoot (Spea hammondii) - proposed as federally threatened and CDFW Species of Special Concern.

4. Southwestern pond turtle (Actinmys pallida) - proposed as federally threatened and CDFW Species of Special Concern.

5. Tricolored blackbird (Agelaius tricolor) - State listed as threatened.

6. Northern California legless lizard (Anniella pulchra) - CDFW Species of Special Concern.

7. Coast horned lizard (Phrynosoma blainvillii) - CDFW Species of Special Concern.

8. Western burrowing owl (Athene cunicularia) - CDFW Species of Special Concern.

9. Yellow warbler (Setophaga petechia) - CDFW Species of Special Concern.

A full list of all the species identified in the project area are shown in the full memorandum in Appendix F.

3.3.2 Cultural Resources
An updated cultural resources analysis was not completed at this preliminary stage. This section summarizes the archaeological and cultural issues highlighted in the 2006 EIR. In that EIR, a literature review and field analysis of any excavated areas was conducted to assess any potential items of cultural significance in the area.

VOLUME 2 / CHAPTER 3: ENVIRONMENTAL SETTING AND LAND USES OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 3-9
Cultural resources, as defined by California law, are buildings, sites, structures, or objects that may have historical, prehistoric, archaeological, or cultural importance. Site disturbances such as those seen in construction have the potential to cause adverse effects to these sites.

In the 2006 EIR, there were no historical resources designated within the project area of the WWTP expansion. In any updated analyses and EIR's for plant expansions, it will be important to assess any newly developed structures that may have developed cultural significance on the property.

Further, considering the age of some of the structures currently in operation at the WWTP, an assessment of the cultural impact of those existing structures may be completed in the context of CEQA.

Other potential resources on the property include:
 Paleontological Resources - no human remains or Native American tribal remains/artifacts have been found on the property.
 Geological Resources - No unique geological features are located on the property.  Archaeological Resources - no culturally significant resources have yet been found in the area.

Understanding the existing cultural resources around the site will allow for context during construction and permitting of any expansions.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-1
CHAPTER 4 REGULATORY REQUIREMENTS

4.1 Introduction
The City's update of the Master Plan will be used to guide the City's decisions regarding expansion and modernization of the wastewater collection and treatment facilities. In addition to estimating the additional treatment capacity required to service the needs of a growing population, the update to the Master Plan attempts to anticipate the level of treatment required by the expansion to comply with state and federal regulations both now and in the future.

The purpose of this chapter is to assess how the current and future regulations could affect planning, design, construction, operations, and maintenance decisions at the City's WWTP. The focus of this assessment is on regulations relating to updates to the General Permit, emerging contaminant regulations, future water reuse requirements, air quality permits, and biosolids disposal restrictions and regulations.

For a quick summary of the key takeaways for this chapter, please refer to Table 4.15 in Section 4.6.

4.2 Water Quality
The following sections summarizes both current and potential future federal, state, and local regulations related to liquid streams, and describes the potential impact on the City's WWTP. It also summarizes the City's new WDR permit and its effects on treatment requirements.

4.2.1 Regulatory Setting and Overview
The water quality regulations that govern operation of the City's WWTP are described in the following sections.

4.2.1.1 Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act (Porter-Cologne Act, California Water Code Division 7) implements a comprehensive program to protect water quality and beneficial uses of surface waters, wetlands, and groundwaters of California. The Porter-Cologne Act prohibits the disposal of waste in a manner that causes or threatens to cause pollution, contamination, or nuisance, including the discharge of waste into groundwater or in areas where it may enter surface water or groundwater (California Water Code Section 13050(l)).

The Porter-Cologne Act established the nine Regional Water Quality Control Boards (RWQCBs) with oversight provided by the SWRCB. The SWRCB and the RWQCBs have enforcement authority, adopt water quality policies, and issue permits to regulate the discharge of pollutants into state waters. National Pollutant Discharge Elimination System (NPDES) permits are issued by the state but are part of the federal Clean Water Act (CWA) program and regulate discharges to waters of the United States. WDRs, on the other hand, are state-level regulations that cover discharges to land or groundwater. The SWRCB adopts statewide plans, policies, and permits. The RWQCBs designate beneficial uses for all water bodies within VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-2
their regions, assign water quality objectives (WQOs) to protect those beneficial uses, and adopt plans and policies specific to their hydrologic regions. The beneficial uses and WQOs are identified in the Water Quality Control Plans (or Basin Plans) that are adopted and periodically revised for each region. Each Basin Plan also includes the applicable policies adopted by the SWRCB.

4.2.1.2 Antidegradation Policy (SWRCB Resolution No. 68-16) New or changed waste discharges to California waters that may potentially degrade high quality water are only allowed if the change in water quality "(1) will be consistent with maximum benefit to the people of the State of California (State), (2) will not unreasonably affect present and anticipated beneficial use of such water, and (3) will not result in water quality less than that prescribed in state policies (e.g., WQOs in Water Quality Control Plans)". Such discharges are required to meet WDRs through application of best practicable treatment or control necessary to ensure that pollution or nuisance is avoided and that the discharge will not “unreasonably impact present and anticipated beneficial uses of the water."

4.2.1.3 Sources of Drinking Water Policy (SWRCB Resolution No. 88-63) Per the Sources of Drinking Water Policy, all surface waters and ground waters in California are designated with the beneficial use of municipal or domestic water supply (MUN) except for:

1. Surface and ground waters where:
a. The total dissolved solids (TDS) exceed 3,000 mg/L (milligrams per liter) (5,000 microsiemens per centimeter, electrical conductivity) and it is not reasonably expected by Regional Boards to supply a public water system, or
b. There is contamination, either by natural processes or by human activity (unrelated to the specific pollution incident), that cannot reasonably be treated for domestic use using either Best Management Practices or best economically achievable treatment practices, or c. The water source does not provide sufficient water to supply a single well capable of producing an average, sustained yield of 200 gpd.

2. Surface waters where:
a. The water is in systems designed or modified to collect or treat municipal or industrial wastewaters, process waters, mining wastewaters, or storm water runoff, provided that the discharge from such systems is monitored to assure compliance with all relevant WQOs as required by the Regional Boards, or
b. The water is in systems designed or modified for the primary purpose of conveying or holding agricultural drainage waters, provided that the discharge from such systems is monitored to assure compliance with all relevant WQOs as required by the Regional Boards.

3. Ground water where:
a. The aquifer is regulated as a geothermal energy producing source or has been exempted administratively pursuant to 40 Code of Federal Regulations (CFR) Section 146.4 for the purpose of underground injection of fluids associated with the production of hydrocarbon or geothermal energy, provided that these fluids do not constitute a hazardous waste under 40 CFR Section 261.3.

These stipulations govern the designation of MUN beneficial use for waterbodies and determine the regulatory restrictions that are triggered for discharges to these waterbodies.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-3

4.2.1.4 Water Quality Enforcement Policy (SWRCB Resolution No. 2023-0043) The SWRCB Water Quality Enforcement Policy outlines a transparent, fair, and consistent statewide program for enforcing requirements specified in the Porter-Cologne Act. The Water Quality Enforcement Policy establishes a process for ranking enforcement priorities, reaffirms progressive enforcement, provides a methodology for assessing administrative civil liabilities, recognizes the value of using alternatives to financial penalties (e.g., supplemental environmental projects), addresses the eligibility of small communities to implement compliance projects (rather than paying mandatory penalties), and establishes annual enforcement and planning requirements. The Enforcement Policy underwent a review in 2023 and was adopted on November 7, 2024.

4.2.1.5 Water Quality Control Plan for the Central Coast Basin The Water Quality Control Plan for the Central Coast Basin (Central Coast Basin Plan) is reviewed by the Regional Board at least every three years and updated as needed to incorporate water quality issues of concern and incorporate regulatory changes implemented by the SWRCB and EPA. The current version of the Central Coast Basin Plan is dated June 2019 and amendments are underway that will add pesticide water quality criteria and incorporate total maximum daily loads for various water bodies. The Santa Maria WWTP discharges to groundwater, specifically the Upper Guadalupe Sub-Area of the Santa Maria River Valley Groundwater Basin. The Central Coast Basin Plan designates the following beneficial uses for all groundwater within the Central Coast Basin: MUN, Agricultural Supply (AGR), and Industrial Service Supply (IND). The WQOs assigned for the MUN beneficial use include narrative objectives for taste and odor, as well as numeric WQOs for bacteria, primary maximum contaminant levels (MCLs), and radioactivity.

The WQOs assigned for the AGR beneficial use include irrigation guidelines from the University of California Agricultural Extension Service (Basin Plan Table 3-1) and specific objectives for irrigation and livestock watering (Basin Plan Table 3-2). In addition, WQOs are assigned to specific groundwater basins (Basin Plan Table 3-6). The median groundwater objectives for the Upper Guadalupe Sub-Area of the Santa Maria River Valley Groundwater Basin apply to discharges from the WWTP. See Appendix G for the numerical values associated with the WQOs.

4.2.2 Current Regulations and Practices
The Santa Maria WWTP receives wastewater from the City, the Santa Maria Airport District, and a part of the Laguna County Sanitation District. Secondary treatment is accomplished using trickling filters and the effluent is transported to percolation ponds for disposal.

4.2.2.1 General Order Waste Discharge Requirements (Order No. R3-2020-0020) Operation of the WWTP is currently regulated by General WDR Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 gpd. On June 16, 2023, the City received a NOA to enroll in the General Order WDR, replacing the previous individual WDR (Order No. R3- 2010-0001). The NOA implements applicable provisions of the General Order WDRs (i.e., discharge prohibitions, effluent limits for trickling filter systems, percolation pond disposal, pretreatment program, sludge handling/biosolids disposal).

In addition, Monitoring and Reporting Program (MRP) Order No. R3-2023-0032 was transmitted with the NOA that specifies monitoring locations, constituents, and sampling frequencies to demonstrate VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-4
compliance with the General Order WDRs. The NOA and the MRP prescribe requirements consistent with the Central Coast Basin Plan, Porter-Cologne Act, and SWRCB plans and policies. The City's NOA and MRP are included in Appendix H. Under the previous individual WDRs, the City was reporting carbonaceous biochemical oxygen demand (CBOD) and total suspended solids (TSS) results for effluent limit compliance.

After the NOA was received by the City, ongoing communications and discussions have taken place between the City and the Water Board. The following timeline highlights the major developments with regard to finalization of the City’s new General Order discharge permit requirements:

1. June 16, 2023 - The City received the NOA to enroll in General Order No. R3-2020-0020, updating the permit from the previous R3-2010-0001 that had governed the WWTP operation. a. The NOA provided the City two years to reach the targets stated in the new General Order. The interim limits are shown in Table 4.1.
b. After the two-year target, on June 16, 2025, the City was required to comply with the final limits shown in Table 4.2.

Table 4.1 City WWTP Interim Effluent Limitations (until June 16, 2025) and Historical Water Quality Parameter Unit Limit -
30-Day Average
Limit -
Daily Maximum
Historical Average
(2018-2023)
Annual Average
for 2022
BOD5 mg/L 60 100 44.4 CBOD(1)

70.1 BOD5
45 (CBOD)
TSS mg/L 60 100 38.6 37
Settleable Solids mL/L 0.1 0.4 <0.1 <0.1
TDS(2) mg/L 1,000 N/A 844 1,055
Sodium(2) mg/L 180 N/A 145 140
Chloride(2) mg/L 180 N/A 156 143
pH N/A 6.5 to 8.4 6.5 to 8.4 8 7.8
Notes:

BOD5 - 5-day biochemical oxygen demand; mL/L - milliliters per liter; N/A - not applicable (1) The City historically measured CBOD rather than BOD₅ for compliance. CBOD value shown is an average of 2018 to 2023. (2) Compliance is based on a three-year running mean.

Table 4.2 City WWTP Final Effluent Limitations (After June 16, 2025)(1)(2) Parameter Unit 30-Day Average 7-Day Average Sample Maximum BOD5 mg/L 30 45 N/A
TSS mg/L 30 45 N/A
Settleable Solids mL/L 0.1 0.3 0.5
pH N/A Between 6.5 and 8.4 N/A N/A
Notes:
(1) Timeline modified per the TSCP submitted to the Regional Water Board in June 2024. (2) Additional limits apply. See Table 4.3.

Since the City would not be able to comply with a number of the final effluent limits, the City has begun planning to design upgrades to the WWTP to address the effluent BOD5, TSS, and total nitrogen requirements, which is the driver for development of this Master Plan.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-5
Accordingly, because the City would require more than the two-year timeframe to achieve compliance with the effluent limitations, the City developed a Time Schedule Compliance Plan (TSCP), a requirement of the MRP.

1. January 2024 - The City had a meeting with the Water Board to discuss concerns about meeting the deadlines presented in the NOA and the presented progress that had already been made with respect to the Master Plan and development of the TSCP.

2. June 2024 - The City submitted a TSCP to the Water Board, highlighting actionable steps the City would take to reach the effluent targets stated in Table 4.2. A copy of the TSCP is included in Appendix I.
a. The TSCP indicated that the WWTP will be unable to meet BOD, TSS, and total nitrogen limits by June 2025, as specified in the General Order, and requested a time extension to achieve this. b. Actionable steps included the development of a TDS Source Water Improvement Study, a pilot tertiary filtration project to evaluate interim BOD removal, evaluation of percolation pond performance, and ongoing development of a Master Plan to modify and expand the WWTP to meet the new more stringent effluent discharge limits.

The General Order WDRs provide two options for compliance with the groundwater basin-specific limits.

Option 1 is to comply with effluent limits assigned for the designated groundwater basin. These effluent limits would be in effect after June 16, 2025. Option 2 is to implement a groundwater monitoring program and demonstrate the discharge does not cause underlying groundwater to exceed the groundwater basin-specific WQOs. The City was required to select either Option 1 or Option 2 by June 16, 2024, in the TSCP.

The Water Board also stated in the NOA that the current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trends for the City's wastewater disposal operations. Therefore, if Option 2 was selected, the City would need to submit a groundwater monitoring workplan and a hydrogeologic conceptual site model for RWQCB approval.

The new monitoring wells would need to be installed in shallow groundwater with at least three wells proposed in locations to represent upgradient, underlying, and downgradient groundwater quality.

In addition to not being able to comply with the final effluent limits for BOD5 and TSS, there was concern that the WWTP may not be able to comply with all the groundwater limitations in Option 2. A review of historical groundwater monitoring is presented in Appendix J. In the analysis, the three constituents that consistently measured over the groundwater objective for the Upper Guadalupe Sub-Area Basin were nitrogen, chloride, and TDS. For nitrogen, all well groundwater concentrations were above the median groundwater objective of 1.4 mg/L. Over the time period between 2018 and 2023, total nitrogen concentrations in the monitoring wells were measured over the observed background concentration 18 separate times. The average effluent nitrogen concentration was 43 mg/L. The groundwater data also showed issues with chloride and TDS, where the groundwater concentrations sampled were near or slightly above the groundwater basin objective.

Based on the analysis, Option 1, compliance with the effluent discharge limits, was selected for final compliance.

Table 4.3 shows the groundwater basin limits for the Upper Guadalupe Basin applicable for Options 1 and 2, the only difference being the total nitrogen limit of 10 mg/L for Option 1 and 1.4 mg/L for Option 2.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-6
Table 4.3 Upper Guadalupe Groundwater Basin Options for Final Compliance (After June 16, 2025) Constituent Unit Effluent Limitation (Option 1)(1) Groundwater Limitation (Option 2)(1) Boron mg/L 0.5 0.5
Chloride mg/L 165 165
Nitrogen, Total (as N) mg/L 10 1.4
Sodium, Total mg/L 230 230
Sulfate mg/L 500 500
TDS mg/L 1,000 1,000
Notes:
(1) Limitations are a 25-Month Rolling Median (mg/L).
(2) Option 1 was selected in the TSCP for compliance.

1. June 16, 2025 - The new effluent discharge limits (Table 4.2) became effective. But, as noted above, the WWTP is not able to achieve these limits, and the City began reporting violations of the limits in their quarterly Self-Monitoring Reports (SMRs).

2. September 2025 - The City submitted the TDS Source Water Improvement Study to the RWQCB.

A copy is included in Appendix K.

3. October 2025 - The Water Board accepted the results of the percolation pond investigation, updating the WWTP disposal limit to a monthly limit of 8.3 mgd to replace the daily average limit of 8.0 mgd.

4. November 2025 - The Water Board issued a Draft Time Schedule Order (TSO) for the City’s review.

This would take the place of the TSCP, once approved. The City responded to the Water Board with comments, and the revised TSO was issued for public comment in December 2025.

5. February 5, 2026 - The Water Board issued the final TSO, extending the interim effluent limits for BOD, TSS, and total nitrogen to a new final compliance date of September 30, 2034. The new Interim Effluent Limits are shown in Table 4.4. A copy of the Final TSO is included in Appendix L.

Table 4.4 Interim and Final Compliance Limits for BOD, TSS, and Total Nitrogen - Time Schedule Order (February 2026)
Constituent Unit New Interim Limits
(extended until September 30, 2034)
Final Limits
(after September 30, 2034)
BOD5
(1) mg/L 119 30
TSS(1) mg/L 43 30
Nitrogen, Total (as N)(2) mg/L 55 10
Notes:
(1) Limitations are a 30-day average (mg/L).
(2) Limitations are a 25-Month Rolling Median (mg/L).

The TSO does not exempt the WWTP from the limits of other constituents specified in the General Order, shown in Tables 4.2 and 4.3. It only applies to the constituents shown in Table 4.4. Limits for all other constituents are currently in effect.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-7

4.2.2.2 Monitoring and Reporting Program (Order No. R3-2023-0032) A project-specific MRP was included with the NOA that includes requirements to evaluate performance of the Santa Maria WWTP and demonstrate compliance with effluent and receiving water limitations. The City is required to conduct influent and effluent monitoring for technology-based effluent limits, nitrogen compounds, and minerals and water supply monitoring for nitrate and minerals (see Appendix H).

Percolation pond monitoring is required weekly to measure freeboard and monthly to evaluate dissolved oxygen, color, vegetation in the ponds, and berm condition.

As part of the MRP requirements, the City was required to prepare a Climate Change Adaptation Plan, which was prepared and submitted as a draft report to the Regional Water Board in July 2025. A final copy of this report is included as Appendix M.

4.2.3 Future Regulations
Future regulations applicable for operation of the Santa Maria WWTP include possible new effluent limits, prohibitions, and receiving water limits. Obtaining a credit for groundwater recharge within the adjudicated Santa Maria River Valley Groundwater Basin may require compliance with Title 22 indirect potable reuse (IPR) regulations (Article 5.1 Groundwater Replenishment - Surface Application).

Compliance with IPR regulations would include effluent limits for total organic carbon (TOC), requirements for pathogen removal, groundwater modeling to determine underground travel time to the nearest potable well, and monitoring for constituents of emerging concern (CECs).

As the groundwater basin is a drinking water source, all MCLs are applicable to the groundwater. The City may periodically monitor effluent and groundwater quality to evaluate if the effluent is contributing to any exceedances of MCLs in the groundwater basin. As more CECs, such as per- and polyfluoroalkyl substances (PFAS) compounds, are regulated as MCLs, it is possible the City's effluent could be a source of contamination to the groundwater basin. Compliance with any MCL will be in the groundwater, down gradient of the percolation ponds, and incorporating groundwater mixing. However, source control and/or treatment to remove emerging contaminants in the final effluent waste stream may be required.

Constituents of interest for future regulations are described in Table 4.5. Possible WQOs (current and future) applicable for the City's WWTP percolation pond operations are provided in Appendix N.

Table 4.5 Constituents of Interest for Future Regulations Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Phenol Phenol is a chemical component that exists in the environment from natural and anthropogenic
sources (e.g., manufacturing and industrial
wastes, combustion emissions, and tobacco
smoke) and is toxic to neurological development
and reproductive systems in humans.

Under Option 2, the NOA specifies
groundwater monitoring annually for
these three constituents with a
reduction to once in five years if not
detected in the initial sample.

Effluent monitoring may be required
if detected in groundwater. Formaldehyde Formaldehyde is a chemical compound found in some man-made products and, when released
into the air, can pose a carcinogenic risk to
humans.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-8
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Zinc The predominant anthropogenic sources of zinc
are from paints, galvanized materials, and tires.

Concentrations of zinc above WQOs can be toxic
to aquatic organisms and negatively impact
beneficial uses of California waters.

Chromium VI Hexavalent chromium, or Chromium VI, is a heavy metal that has been used in industrial applications
and can occur naturally in the environment. It is
known to be carcinogenic and toxic to the liver.

New MCL and DLR adopted on
April 19, 2024.

Mercury Concentrations of mercury can exceed naturally
existing background concentrations from human
activity (e.g., metal processing, coal incineration,
medical and other waste, and mining), and
negatively impact the beneficial uses of waters of
the state by making fish unsafe for human and
wildlife consumption. Mercury has been observed
to cause renal failure and negatively affect the
nervous system.

SWRCB identified priority to
develop a new MCL for mercury.

Selenium Anthropogenic sources of selenium are primarily from agricultural irrigation practices. Elevated
selenium levels can be toxic to fish and
aquatic-dependent birds.

No regulatory changes proposed,
but a typical groundwater concern.

TTHMs (bromoform,
chloroform, DBCM, DCBM)
TTHMs are a group of chemicals released into the
environment as disinfection byproducts and are
associated with increased cancer risk.

Drinking water MCLs for TTHMs,
HAA5s, bromate and chlorite exist.

SWRCB identified priority to
develop new MCLs for disinfection
byproducts. HAA5 (monochloroacetic acid,
dichloroacetic acid,
trichloroacetic acid,
monobromoacetic acid,
dibromoacetic acid)
HAA5 are a group of chemicals released into the
environment as disinfection byproducts. These
compounds can be toxic to DNA and increase
cancer risk.

Bromate Bromate is released into the environment as a
disinfection byproduct, when source waters
containing bromide are treated with ozone or
sodium hypochlorite. It can be toxic to DNA and
increase cancer risk.

Chlorite Chlorite is released into the environment as a disinfection byproduct, when source waters are
treated with chlorine dioxide. Chlorite toxicity can
cause red blood cell damage, hormone
dysfunction, and potentially delay
neurodevelopment.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-9
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Aluminum Anthropogenic sources of aluminum include
coagulation water treatment processes (e.g., via
aluminum sulfate), as well as leaching of
aluminum-containing waste streams (e.g.,
consumer goods, and waste incineration).

Aluminum is a non-essential metal and poses a
potential risk to human health. High
concentrations of aluminum above health
guidelines have been linked to certain
neurogenerative disorders.

No regulatory changes proposed,
but a typical groundwater concern.

Manganese Manganese is a naturally occurring element in the environment but is also released into the
environment from human activities such as mining
and industrial discharges. High manganese
concentrations can pose a neurotoxic risk,
particularly in children (e.g., cognitive disabilities
in children, and Parkinson's-like symptoms in
adults).

Manganese has a Secondary MCL
in California of 0.05 mg/L. SWRCB
proposed lower NL and RL on
February 16, 2023.

Perchlorate Anthropogenic sources of perchlorate
predominate from fuels used for rockets and
missiles. This contaminant can disrupt thyroid
function and has the greatest impact on pregnant
women and children.

Perchlorate has an MCL in
California of 0.006 mg/L. SWRCB
proposed lower DLR on April 23,
2020, and is a typical groundwater
concern.

MTBE MTBE is predominately used as a gasoline
additive. At low concentrations, MTBE present in
drinking water can cause unpleasant odor and
taste; in high concentrations studies suggest
ingestion of MTBE can cause impacts to the liver,
kidney, and the gastrointestinal and nervous
systems.

MTBE has an MCL in California of

0.013 mg/L. No regulatory changes
proposed, but a groundwater
concern.

Arsenic Arsenic is ubiquitous, commonly found in
California drinking water sources. Chronic arsenic
exposure is linked with increased risk for internal
cancers and other adverse health effects.

Arsenic has an MCL in California of

0.010 mg/L. SWRCB identified
priority to develop new MCL for
arsenic.

Cadmium Cadmium is a metal frequently used in batteries.

Chronic cadmium exposure may increase risk of
lung, prostate, and kidney cancer.

Arsenic has an MCL in California of

0.005 mg/L. SWRCB identified
priority to develop new MCL for
cadmium.

NDMA Though no longer produced or commercially used
in the United States, NDMA concentrations have
been found in drinking water sources. NDMA was
formerly used in the production of rocket fuel and
other consumer products and is also a disinfection
byproduct from water treatment. Exposure to
NDMA is linked with increased cancer risk and
liver damage.

There is no drinking water MCL for
NDMA in California, but the
SWRCB identified priority to
develop MCL for NDMA; NDMA is
also a CEC surrogate for IPR
projects.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-10
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Styrene Styrene is used primarily to make rubbers and
plastics. Exposure to styrene is known to increase
cancer risk.

Styrene has an MCL in California of

0.10 mg/L. SWRCB identified
priority to develop new MCL for
styrene.

Microplastics Microplastics are becoming more prevalent in the environment. Although numerous studies are
ongoing, initial studies suggest that microplastics
have an impact on human and animal health.

Microplastics also contain chemical additives
which when ingested may cause health concerns.

The Federal EPA formally added
microplastics to the draft
Contaminant Candidate List 6
(CCL 6), initiating a process for
integrating microplastics into future
regulations under the Safe Drinking
Water Act.

The California State Water Board
has adopted a standard
methodology for the testing and
reporting of microplastics for
potential future limits.
1,4-Dioxane 1,4-Dioxane is a synthetic compound used as a stabilizer in industrial applications (e.g., solvents,
greases, and waxes) and has been used in
personal care products like detergents, cosmetics,
and shampoos. It is a likely human carcinogen
and does not readily degrade in the environment.

California has a NL limit of

0.001 mg/L for 1,4 Dioxane but no
MCL yet. No regulatory changes
proposed, but could be a
groundwater concern. 1,4-Dioxane
is also a CEC surrogate for IPR
projects.

PFOA
PFOS
PFBS
PFHxS
Gen X (HFPO-DA)
PFNA
These are synthetic fluorinated chemicals that
belong to a group referred to as PFAS. These
chemicals are used in consumer products to make
materials stain-resistant, waterproof, and
non-stick. Many are no longer produced in the
United States, however because they do not
readily degrade in the environment,
concentrations have been found in surface waters
and drinking water sources. Chronic exposure to
low concentrations of PFASs may result in
adverse human health effects. Exposure to
PFASs can also negatively impact developmental
and reproductive systems.

EPA approved MCLs for PFOA and
PFOS on April 26, 2024. The
SWRCB is developing Primary
MCLs with expected adoption in
2025. The MCLs for PFOA and
PFOS have a compliance date of
April 26,2029, but this can be
extended by two years for approved
system.(1) PFOS and PFOA are
also CEC surrogates for IPR
projects.

EPA approved a HI MCL for the
mixture of PFBS, PFHxS, HFPO-DA, and PFNA on April 26, 2024.

As of May 18, 2026, the EPA has
proposed rescinding the MCL for
these compounds.(1)
VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-11
Constituent Significance to Water Quality(1) Regulatory Concern, Status, Timeline
Anatoxin-a
Saxitoxins
Microcystins
Cylindrospermopsin
These include persistently detected cyanotoxins
found in California surface waters. Under the right
conditions, proliferation can cause harmful
cyanobacterial blooms, and potentially contribute
to nutrient pollution, increased temperatures, and
drought.

OEHHA submitted NL
recommendations to SWRCB on
May 6, 2021.

Notes:

DBCM - chlorodibromomethane; DCBM - bromodichloromethane; DLR - Detection Limit for Purposes of Reporting; HAA5 - haloacetic acids; HFPO-DA - hexafluoropropylene oxide dimer acid; HI - Hazard Index; MTBE - methyl tert-butyl ether; ND - non detect; NDMA - N-Nitrosodimethylamine; NL - notification level; OEHHA - Office of Environmental Health Hazard Assessment; PFBS - perfluorobutanesulfonic acid; PFHxS - perfluorohexane sulfonate; PFNA - perfluorononanoic acid; PFOA - perfluorooctanoic acid; PFOS - perfluorooctane sulfonate; RL - reporting limit; TTHM - total trihalomethane (1) On May 18, 2026, the EPA announced a proposed rule to allow public water systems to seek a federal extension for two additional years to comply with the MCLs for PFOA and PFOS; and the extension would shift the compliance date to April 26,2031, for approved systems. In the same announcement, the EPA also proposed rescinding the MCLs for PFHxS, PFNA, and GenX, the HI for mixtures of these three, plus PFBS. At the time of writing, this was the most recent announcement from the EPA.

4.2.4 Treatment Implications
Improvements to the WWTP must adequately treat the effluent wastewater constituents shown in Tables 4.2 and 4.4. Currently, the system is not able to remove nitrogen. The new liquid stream treatment system will likely include:
 Activated sludge technologies that provide BOD₅ and nitrogen removal such as oxidation ditches, Bardenpho or Modified Ludzack-Ettinger (MLE) configurations.  Improvements to the water supply or the pretreatment system to reduce the influent levels of TDS.  Continued maintenance and operation of the percolation ponds.

A detailed discussion of the treatment alternatives evaluated and the selected treatment train to be implemented to meet the requirements of the new General Order and the anticipated growth in the City can be found in Volume 6 - Liquid Treatment Approach to Addressing General Order.

4.3 Biosolids and Solids Handling
The solids handling regulations that govern the operation of the Santa Maria WWTP are summarized in the following sections.

4.3.1 Regulatory Setting and Overview - Solids Handling

4.3.1.1 Federal Regulatory Agencies
At the federal level, the EPA establishes and enforces the federal regulations that govern biosolids generated at the Santa Maria WWTP. These rules and regulations are codified in CFR Title 40: Protection of the Environment. Most of the regulations impacting wastewater biosolids are based on the implementation of the CWA. The major sections of the CFR that apply to the biosolids generated at the Santa Maria WWTP are referenced throughout this report. The EPA's Pacific Southwest region (Region 9) is responsible for implementing and enforcing these federal regulations in California.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-12

4.3.1.2 State Regulatory Agencies
At the state level, the SWRCB and the Division of Water Quality establish statewide policy and additional rules, guidelines, criteria, and regulations for biosolids beneficial end use/disposal. The California Department of Resources Recycling and Recovery (CalRecycle) also has jurisdiction over biosolids disposal as it oversees and regulates California's solid waste disposal including co-disposal issues and use of biosolids as alternative daily cover (ADC) in landfills.

4.3.1.3 Local Regulatory Agencies
At the local level, the Central Coast RWQCB (Region 3) is responsible for rulemaking, permitting, and enforcement of federal and state requirements at the Santa Maria WWTP. The Central Coast RWQCB has jurisdiction over San Luis Obispo, Santa Barbara, and Monterey counties. Additionally, Santa Barbara County has jurisdiction to institute land application ordinances at the county level.

4.3.1.4 Regulatory Overview
Similar to the treated water effluent limits, the WWTP must comply with biosolids and solids handling regulations. Table 4.6 provides an overview of the current and future biosolids regulations, codes, policies, and agreements (requirements) that apply to the biosolids generated at the Santa Maria WWTP. The following sections expand on these requirements.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-13
Table 4.6 Summary of Solids and Biosolids Regulatory Agencies and Regulations Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
Federal EPA  Federal Water Pollution Control Act Amendments of 1972 (CWA).
 CFR Title 40: Chapter I Protection of Environment:
» Subchapter O: Sewage Sludge.
 40 CFR 501, State Sludge Management Program.
 Part 503, Standards for the Use or Disposal of Sewage Sludge:
» Subchapter I: Solid Wastes.
 Part 257, Criteria for Classification of Solid Waste
Disposal Facilities and Practices.
 Part 258, Solid Waste Disposal Facility Criteria:
» Subchapter R: Toxic Substances Control Act.
 Part 761, PCBs Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions.

Current  Establishes general requirements for the National Pollutant Discharge Elimination System Program.
 Establishes standards for biosolids disposal and
end use.
 Biannual Reviews of 40 CFR Part 503:
» Dioxins Risk Assessment.

Current/ Future  May result in biosolids limits for nine pollutants of potential concern.

EPA PFAS Strategic Roadmap Current/Future  Research of PFAS proliferation.  Restriction of PFAS from sources.
 PFAS Risk assessments.

EPA POTW Influent PFAS Study Data Collection Current/Future  Would require the 400 largest WWTPs to fill out a questionnaire about potential industrial sources of
PFAS.
 200 to 300 WWTPs will be selected to sample
influent, effluent, biosolids, and up to 10 industries
for 40 target PFAS and adsorbable organic
fluorine.
 One-time grab samples.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-14
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
State California
SWRCB
General Order (1) Current  Establishes standards for biosolids disposal and end use.
 Water Codes Sections 13267 and 13383 Order for the
Determination of the Presence of PFAS at POTWs
(Order WQ 2020-0015-DWQ).

Current/Future  Currently requires quarterly sampling of WWTP biosolids for PFAS analytes over a one-year
period.
 May result in PFAS limits for biosolids.

CalRecycle  CCR title 27, Division 2.
 Title 22, Division 4.5, Chapter 11: CWEA Manual of Good Practice.

Current  Establishes standards for solid waste disposal in the State of California.

California State
Legislature
 AB 876, Compostable Organics.
 AB 1826, Compostable Organics.
 AB 1594, Waste Management.
 AB 341, Solid Waste Diversion.
 AB 901, Solid Waste Reporting Requirements and
Enforcement.
 SB 1383, Short-Lived Climate Pollutants: Methane
Emissions, Dairy and Livestock, Organic Waste,
Landfills.
 SB 970, Greenhouse Gas Reduction Fund and Grant
Program.
 Healthy Soils Initiative.
 Executive Order N-82-20 (Protects 30 percent of
California's lands and waters by 2030, outlining initial actions to achieve this goal).

Current/Future  Expected to impact the biosolids disposal and end use market. For example:
» Availability of biosolids land application sites.
» Increased competition to convert biosolids to
compost.
» Increased incentive for land application.
 Increased incentive for co-digestion of organic
waste).
 SB 1422, California Safe Drinking Water Act.
 SB 1263, Ocean Protection Council: Statewide
Microplastics Strategy.

Future  May result in required testing of microplastics in biosolids.
 PFAS limits for land applications.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-15
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/Future
Impact
Impact on City's Wastewater Facilities
Local RWQCB WDRs for the City's Water Reclamation Facility (Order R3-2020-0020)
Current  References federal regulations contained in
40 CFR part 503 that apply to the WWTP's
solids/biosolids.
 References SWRCB Water Quality Order
No. 2004-0015-DWQ which applies to the WWTP's
solids/biosolids.

Notes:

AB - Assembly Bill; CCR - California Code of Regulations; CWEA - California Water Environment Association; PCB - polychlorinated biphenyls; POTW - publicly owned treatment works; SB - Senate Bill
(1) General Order - SWRCB's Order No. 2004-0012-DWQ, General WDRs for the Discharge of Biosolids to Land for Use as a Soil Amendment in Agriculture, Silviculture, Horticulture, and Land Reclamation Activities.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-16

4.3.2 Current Regulations and Practices
The following sections summarize the current federal, state and local regulations that impact treatment and disposal of biosolids generated at Santa Maria WWTP as well as the current practices used.

4.3.2.1 Federal Requirements
40 Code of Federal Regulations Part 503 Regulations
To implement a long-term biosolids program required by the Water Quality Act of 1987, the EPA expanded the WDR programs to include biosolids management. As part of this effort, the EPA initiated two rulemakings resulting in the promulgation of 40 CFR Part 503, Standards for the Use or Disposal of Sewage Sludge. The regulation establishes requirements, procedures, operational standards, and management practices for:
 Biosolids management in WDR permits.
 Implementing federal biosolids permit programs if a state so chooses.  Granting state biosolids management programs primacy over federal programs.  Land application of sewage sludge (which is biosolids in this context) for beneficial use.  Surface disposal in a monofill, surface impoundment, or another dedicated site.  Incineration of sewage sludge with or without auxiliary fuel.

The regulation applies to non-hazardous wastewater solids that are applied to land, fired in a sewage sludge incinerator, or placed on a surface disposal site. Approximately 25 percent of the City's biosolids are disposed of via the City's landfill and the remainder is composted. Some landfills require that biosolids meet some of the classifications established in 40 CFR Part 503 (such as Class B). The regulation establishes biosolids quality standards based on three parameters:
 Pathogen reduction: Pathogen reduction in biosolids is the removal of disease-causing organisms (i.e., harmful bacteria or viruses) through treatment practices.  Vector attraction reduction: Vector attraction reduction is the minimization of transport of pathogens to humans or other animals via vectors such as flies, mosquitos, rodents, or birds.  Pollutant (metals) concentration: Pollutant concentration refers primarily to metal concentration limits that must be met for applying biosolids to land.

Based on these parameters, the EPA classifies biosolids into Class B, Class A, and Exceptional Quality biosolids.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-17
Class B biosolids are treated with processes that significantly reduce, but do not fully eliminate, pathogens. As such, Class B biosolids may be land applied with restrictions. Land appliers must follow Class B biosolids land application and pollutant load requirements for concern of public contact, animal forages, and production of crops for human consumption. For example:
 Class B biosolids may only be applied to sites where there is no possibility of contact with the general public. These sites include areas with specific types of agriculture, land reclamation, landfills, etc.  Crop harvesting, animal grazing, and public access are restricted after biosolids land application for a defined period until environmental conditions have further reduced pathogens.

Class A biosolids are treated with processes designed to reduce pathogens to nearly undetectable levels.

Therefore, they may be beneficially used, such as fertilizer or compost, at public sites, such as in nurseries, gardens, and golf courses. Class A biosolids are treated by processes such as thermophilic anaerobic digestion, heat drying, and pasteurization.

Exceptional quality biosolids are the highest quality treated biosolids. Exceptional quality biosolids must meet or exceed Class A requirements for pathogen and vector attraction reduction as well as meet more stringent metal pollutant concentrations. Exceptional quality biosolids can be distributed in bulk or bag form and are not subject to general requirements and management practices with the exception of monitoring, recordkeeping, and reporting to substantiate the quality criteria have been met. 40 Code of Federal Regulations Part 501 Regulations
40 CFR Part 501, State Sludge Management Program, includes procedures for approving, revising, and withdrawing State sludge management programs. All State sludge management programs are required to include the following components:
 Authority to require compliance by any person who uses/disposes of sewage sludge.  Authority to issue permits to POTWs that apply and ensure compliance with Section 405 of the CWA, as well as procedures for issuing permits.
 Provisions for regulating use/disposal of sludge by non-permittees.  Authority to take action to protect public health and the environment from adverse effects from toxic pollutants in sewage sludge.
 Authority to enforce permits, including issuance of civil or criminal penalties. 40 Code of Federal Regulations Part 258 Regulations
In addition to the regulations set forth to govern sewage sludge use and disposal, 40 CFR Part 258, Solid Waste Disposal Facility Criteria, was promulgated in October 1991 to control the disposal of sewage sludge classified as solid waste. Sewage sludge is exempt from the definition of solid waste unless the sludge is co-disposed of with household solid waste. 40 CFR Part 258 sets forth criteria for landfills with respect to location, design, operation, groundwater monitoring, and closure with the intent of protection of ground and surface water from contamination. The main requirement for landfilling of sludge is that it must meet the Paint Filter Liquids Test (EPA Method 9095A) and the Toxicity Characterization Leaching Procedure (TCLP) test. The paint filter test method determines the presence of free liquids in a sample.

Well dewatered, stabilized wastewater solids and biosolids typically pass this test. The TCLP test determines whether the sewage sludge is hazardous.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-18
40 Code of Federal Regulations Part 257 Regulations
40 CFR Part 257, Criteria for Classification of Solid Waste Disposal Facilities and Practices, includes regulations for biosolids disposal practices not covered under 40 CFR Part 258 or 503. 40 Code of Federal Regulations Part 261 Regulations
Biosolids must be tested at a frequency dependent on the solids loading to determine if they are non-hazardous. Biosolids that are determined to be hazardous—as defined by 40 CFR Part 261, Identification and Listing of Hazardous Waste—must be disposed of in accordance with the Resource Conservation and Recovery Act and are subject to regulation as hazardous wastes under 40 CFR Parts 124, 262-265, 268, 270, and 271.
40 Code of Federal Regulations Part 761 Regulations
40 CFR Part 761, PCBs Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions, establishes prohibitions and requirements for the manufacturing, processing, distribution in commerce, use, disposal, storage, and marking of PCBs and PCB items. This regulation includes specific disposal requirements for sewage sludge containing more than 50 milligrams per kilogram (mg/kg) of PCBs. The presence of PCBs is detected when conducting the regular testing as required by 40 CFR Part 761 to verify that the sewage sludge is non-hazardous.

4.3.2.2 State Regulations
The following sections summarize the primary state regulations that impact treatment and disposal of biosolids.

State Water Resources Control Board General Waste Discharge Requirements for the Discharge of Biosolids - Order No. 2004-0012-DWQ
The treatment and disposal of Santa Maria WWTP biosolids must comply with the SWRCB Order No. 2004-0012-DWQ, General WDRs for the Discharge of Biosolids to Land for Use as a Soil Amendment in Agriculture, Silviculture, Horticulture, and Land Reclamation Activities (2004 General Order). Currently the City does not land apply biosolids, but if this were to change in the future then the City would need to comply. The 2004 General Order applies to Class B land application sites of all sizes and Class A Exceptional Quality sites where biosolids will be applied at rates greater than 10 dry tons per acre per year to a field that is larger than 20 acres in size.

The 2004 General Order goes beyond the requirements of 40 CFR Part 503 by requiring additional biosolids testing, soil testing, and groundwater sampling. For such a discharge to be allowed, the biosolids must meet these treatment and testing requirements, and must demonstrate capability to be beneficially used as a soil amendment as specified under 40 CFR Part 503. The General Order requires the same pathogen reduction and vector attraction reduction requirements as in 40 CFR Part 503. The 2004 General Order is intended to help streamline the regulatory process for discharges but may not be appropriate for all sites using biosolids due to site specific conditions or locations. Such sites are not precluded from being issued individual WDRs.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-19
Per the general order for biosolids SWRCB No. 2004-0012-DWQ, any biosolids product, including the composted product shall be measured regularly. If the biosolids comply with these limits, it may be permitted for land application. The limits for metals are shown in Table 4.7.

Table 4.7 State Permit (2004-0012-DWQ) - Biosolids Limits (Metals) Pollutant Monthly Average Concentration
(mg/kg)
Ceiling Concentration
(mg/kg)
Arsenic 41 75
Cadmium 39 85
Copper 1,500 4,300
Lead 300 840
Mercury 17 57
Molybenum - 75
Nickel 420 420
Selenium 100 100
Zinc 2,800 7,500
The composted biosolids shall also meet the pathogen and vector reduction standards in Table 4.8.

Table 4.8 State Permit (2004-0012-DWQ) - Biosolids Limits (Pathogens) Pollutant Class A Class B
Fecal coliform <1,000 MPN per gram total solids <2 million CFUs or MPN per gram total solids (dry weight)
Salmonella <3 MPN per 4 grams total solids (dry weight) Concentrations reduced by a factor of 10 Enetric viruses <1 PFUs per 4 grams total solids (dry weight) Concentrations reduced by a factor of 10 Viable helminth ova <1 viable ova per 4 grams total solids (dry weight) - Notes:

CFU - colony forming unit; MPN - most probable number; PFU - plaque forming unit To reach these pathogen reduction limits, time and temperature requirements for anaerobic digesters are provided. For Class B biosolids, anaerobic digesters must run with a minimum solids retention time of 15 days at 35 to 55 degrees Celsius (degrees C) - 95 to 131 degrees F; or 60 days at 20 degrees C (68 degrees F). In addition, 38 percent of volatile solids (VS) must be removed during the anaerobic digestion process.

The selected provisions detailed in the list represent a portion of the requirements detailed for land application. More provisions may be found by consulting the 2004-0012-DWQ permit and WQ 2015-0121-DWQ, the statewide composting permit mentioned above.

Biosolids Disposal Regulations
CalRecycle oversees and regulates California's solid waste disposal, including the disposal of biosolids with municipal solid waste and the use of biosolids as ADC material at landfills. Per the existing permits, Santa Maria WWTP is exempt from the requirements of Consolidated Regulations for Treatment, Storage, Processing, or Disposal of Solid Waste in CCR, Title 27, Division 2, Subdivision 1, Section 20005, et seq.

The Title 27 exemption is in effect so long as Santa Maria WWTP meets the preconditions for Sewage, VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-20
Wastewater, Underground Injection, Soil Amendments, and Fully Enclosed Units categories. Biosolids that are land discharged (disposed), including incineration ash, must also comply with the following regulations:
 CCR Title 23, Division 3, Chapter 15.
 Title 22, Division 4.5, Chapter 11; CWEA Manual of Good Practice for Agricultural Land Application of Biosolids.

PFAS Sampling
The state issued Order WQ 2020-0015-DWQ in July 2020, which requires WWTPs across the state to conduct PFAS sampling of their effluent and biosolids. Per this order, WWTPs must conduct a one year-long sampling of 31 PFAS analytes in the influent and effluent. Further, biosolids must be sampled for PFAS and moisture content once during the same year-long sampling period. As of now, Santa Maria has completed a yearlong sampling baseline for PFAS constituents.

Senate Bill 1383
CalRecycle SB 1383, which became effective on January 1, 2022, requires 50 percent diversion of organics (including wastewater solids and biosolids) from landfills by 2020 relative to 2014 levels and 75 percent diversion by 2025. Historically, both use of wastewater solids as ADC in landfills and land application were considered landfill diversion. However, with the enactment of SB 1383, use of wastewater solids as ADC no longer qualifies as diversion and is considered disposal. This could drive wastewater agencies that currently landfill their biosolids to investigate land application options, development of more anaerobic digestion and composting facilities (both in the public and private sector), increased co-digestion of organics at WWTP having excess anaerobic digestion capacity, and an increase in compost and biosolids products in the market. Furthermore, SB 1383 is expected to overturn county ordinances that overly restrict land application and expand the number of land application sites.

The City has responded to SB 1383 by developing an organic waste management program. This program includes an Edible Food Recovery Program which connects local food-generating businesses with local food recovery organizations to distribute leftover edible food to people in need. In addition, businesses and households have ways to dispose of organics though separate organics containers collected by the City and transported to the local composting facility. In 2023 the City recycled over 1.45 million pounds of organics through their Commercial Organics Recycling Program. An example of the City's annual organic waste newsletter is included in Appendix O.

4.3.2.3 Local Regulations
At a local level, counties across California have developed (or are developing/amending) ordinances governing biosolids land application. The stringency of these county regulations ranges from requiring high minimum insurance to banning biosolids land application altogether. Figure 4.1 summarizes the status of county ordinances affecting the use (specifically, land application) of biosolids. Currently, no regulations exist for land application of biosolids in Santa Barbara County. This is only one of two Southern California counties with no regulations. Just to the north, in San Luis Obispo county, and northeast in Kern county, there is a ban on Class B biosolids application. To the east in Ventura county a Conditional Use Permit would be required, and there are currently no counties south of San Francisco that VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-21
accept Class B solids for land application. Given this trend it can be anticipated that in future it will become more difficult to land apply sub-Class B and Class B solids in and around the Santa Maria area.

Figure 4.1 Map of County Ordinances
Further, Santa Barbara County’s 2030 Climate Action Plan (CAP) sets to reduce organic waste by 35 percent by 2030, and 90 percent by 2045. Although the Santa Barbara CAP does not directly apply to the City of Santa Maria, the goals stated under the target have an effect on land use within the county.

The County CAP aims to be complaint with the requirements of SB 1383, described above. These measures incentivize organic waste recycling and promote composting and land application initiatives that can be incorporated by the Santa Maria WWTP.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-22

4.3.2.4 Current Practices
The City currently operates a series of Gravity Thickeners, Anaerobic Digestors, and Sludge Drying Beds to treat solids. Approximately 75 percent of the dried solids are then sent to an offsite composting facility (operated by Engel & Gray, Inc. [Engel & Gray]) and the remainder to the Santa Maria landfill. The City reports on its solids production and disposal in an annual EPA Sludge Report. An example from 2018 is included in Appendix P. The Engel & Gray composting facility is regulated under a separate Statewide General Composting Permit, Order WQ 2015-0121-DWQ, that stipulates Class A, B and/or Exceptional quality biosolids as a Tier II allowable feedstock - see Appendix Q. Also, as noted above, the City transports organic food waste to the composting facility too. Vegetative and non-vegetative food materials are listed as Tier I and Tier II composting feedstocks, respectively.

The City reports the values of the constituents in Table 4.7 on a quarterly basis, along with total nitrogen and moisture content. In addition, the tonnages of biosolids sent to Engel & Gray Composting, Inc. and Santa Maria Regional Landfill are analyzed monthly.

In 2023, the Santa Maria WWTP anaerobic digesters reached an average VS reduction of 58 percent. The average detention time exceeded the regulatory limit of 15 days with average temperatures of about 35 degrees C. This means Santa Maria WWTP complies with time, temperature, and VS reduction requirements for Class B biosolids treated in anaerobic digesters.

4.3.3 Future Biosolids Regulations
Potential future wastewater solids regulations that may impact Santa Maria's biosolids management are discussed in this section.

4.3.3.1 Biannual Reviews of 40 Code of Federal Regulations Part 503 The CWA requires biannual review of 40 CFR Part 503. Since promulgation of the regulation in 1993, there have been no major changes or new pollutants added. However, as part of the 2009 Targeted National Sewage Sludge Survey, the EPA found nine pollutants of potential concern. These nine chemicals are barium, beryllium, manganese, silver, 4-chloroaniline, fluoranthene, pyrene, nitrate, and nitrite. Limits for these compounds could be included in Part 503 in the future. In addition, molybdenum limits could be introduced for exceptional quality biosolids and cumulative pollutant loading rate conditions.

4.3.3.2 United States Environmental Protection Agency Office of Inspector General Review of Biosolids Program
In November of 2018, the EPA's Office of Inspector General released a report based on their audit of the EPA's biosolids program. The goal of this audit was to assess whether the EPA's biosolids land application program adequately protected human health and the environment. The Office of Inspector General made 13 recommendations to improve the EPA's biosolids land application program, eight of which were accepted by the EPA. Of the five contested recommendations, most were not accepted due to language used on the EPA's website regarding the safety of biosolids. The Office of Inspector General found that chemical risk assessments have not been conducted for 352 pollutants detected in biosolids and stated more research is needed to determine the safety of biosolids.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-23

4.3.3.3 United States Environmental Protection Agency PFAS Biosolids Risk Assessment and PFAS Strategic Roadmap
The EPA developed a PFAS Strategic Roadmap to research, restrict, and remediate the extent of PFAS contamination throughout the United States. It directs local, tribal, and state agencies to identify the scale and the sources of PFAS contamination and identify actionable steps to reduce the harm on the environment and on public health. This has resulted in multiple actions: including banning of some PFAS manufacturing, national drinking water standards for six PFAS compounds, and the designation of two PFAS chemicals as Hazardous substances under the Comprehensive Environmental Response, Compensation, and Liability Act rules. These new rules, passed recently, illustrate the importance of PFAS regulation in the eyes of governing bodies.

In addition, the EPA has provided a finalized laboratory method for quantifying PFAS compounds in biosolids, wastewater, and environmental samples. Methods 1633 and 1621 provide a standardized federal method to track and report PFAS levels. Other analytical methods may be available/required in the future.

The EPA has further directed a Risk Assessment to be conducted for PFOA and PFOS, two significant PFAS compounds, in biosolids. The risk assessment is currently underway and will be published by the end of 2024. The risk assessment will define the scope and scale of PFAS contamination, develop conceptual models for possible exposure routes through land application, surface disposal, and incineration, and develop data-driven tools for analyzing risk in communities. The outcome of this risk assessment will likely lead to regulations aimed to limit human exposure. Overall, PFAS regulations are expected to develop in the short term and may need to be implemented within the planning horizon of this Master Plan.

4.3.3.4 Recently Adopted State Legislation Impacting Biosolids At the federal level, biosolids regulations are well established. In contrast, several recently implemented and anticipated state regulations may impact the future of biosolids land application in California, with some regulatory drivers potentially promoting land application and others potentially limiting land application.

The following recently implemented state-level regulations may promote biosolids land application:
 SB 1383 (2016, effective 2022):
» Is expected to incentivize co-digestion of organics at water resource recovery facilities (wastewater treatment plants) and beneficial use of biosolids and biogas. » Is expected to increase competition for anaerobic digestion and composting capacity. » May overturn overly restrictive county ordinances.
 Several climate initiatives may promote land application for its fertilizer offset and carbon sequestration benefits:
» Healthy Soils Initiative (2016).
» Executive Order N-82-20 (2020).
» AB 284 (2021).
» SB 27 (2021).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-24

4.3.4 Treatment Implications
From a treatment perspective, the legislative trends described above may have a significant impact on the current biosolids regime. Once the implementation of the laws proceed (in particular SB 1383 that requires 75 percent diversion of organics from landfills by 2025 relative to 2014, and the Santa Barbara County CAP that targets 85 percent reduction of organic waste by 2035), the City may face a situation where the Santa Maria landfill that receives some WWTP biosolids may no longer accept them for disposal. Further, increased demand for organics diversion by other businesses and individuals may cause strain on the capacity of the existing composting facilities in Santa Maria (such as Engel & Gray, the existing composting facility). This may further reduce the ability of Santa Maria to send their biosolids to the local composting operation.

This means that the City should explore different alternatives for the long-term disposal of their WWTP biosolids. This may mean producing a higher grade of biosolids, moving from Class B to Class A for example, and/or participating in a consolidated regional biosolids treatment/disposal system.

Participation in a regional treatment/disposal operation may be particularly relevant given the recent concerns over PFAS and microplastics, where consideration of incineration or other thermal processing that could destroy these compounds may be prudent or required as part of the future regulations. If stringent PFAS limits are implemented on biosolids in the future, processes to treat and destroy PFAS may be required. There are ongoing efforts by other WWTPs on the Central Coast to form a regional biosolids group to keep abreast of regulatory developments and technology advances with sludge drying and thermal processing. The City is participating in these regional discussions and efforts.

Further discussion of biosolids treatment processes and disposal alternatives for different biosolids Classes in presented in Volume 8 - Solids Treatment and Handling.

4.4 Air Quality
Air Quality regulations play an increasingly important role in the regulatory landscape in California, as the state attempts to reach its climate targets. WWTPs contribute significantly to meeting the statewide targets. Air quality and emissions are discussed in more detail in Volume 10 - Air Quality and Emissions.

4.4.1 Regulatory Setting and Overview - Air Quality

4.4.1.1 Federal Regulatory Agencies
At the federal level, the EPA establishes and enforces the federal regulations that govern air emissions generated by the Santa Maria WWTP facilities. These rules and regulations are codified in CFR Title 40:

Protection of the Environment. Most of the regulations impacting WWTP air emissions are based on the Clean Air Act (CAA). The major sections of the CFR that apply to air emissions generated at WWTPs are referenced in this chapter. As was the case for biosolids, the EPA's Pacific Southwest region (Region 9) is responsible for implementing and enforcing these federal regulations in California.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-25

4.4.1.2 State Regulatory Agencies
At the state level, the California Air Resources Board (CARB) develops statewide policy and regulations for the protection of public health from the effects of air pollution and enforces federal regulations to meet minimum air quality standards. Additionally, CARB sets state-level air quality standards, identifies pollutants that pose the greatest health risks, measures progress in reducing air pollutants researches the cause and effect of air pollution problems and potential solutions, studies the cost benefit of pollution controls, and leads California's efforts in reducing climate-changing emissions.

4.4.1.3 Local Regulatory Agencies
At the local level, 35 local air pollution control districts share responsibility with CARB to ensure that federal and state air quality requirements are met. The local air districts regulate emissions from factories, industrial facilities, and other stationary sources, such as combustion engines, boilers, and flares at WWTPs. Additionally, the local air districts provide permitting, air quality attainment planning, rulemaking, air quality monitoring, and incentive programs. The Santa Barbara County Air Pollution Control District (SBCAPCD) has jurisdiction over Santa Barbara County, including the City.

4.4.1.4 Regulatory Overview
Table 4.9 provides an overview of the current and anticipated air regulations, codes, policies, and agreements (requirements) that apply to the air emissions generated from the WWTP facilities. These requirements are described in further detail in the following sections:

1. Criteria Pollutant Regulations.

2. Hazardous Pollutant Regulations.

3. Stationary Emergency Standby Diesel-Fueled Combustion Engine Regulations.

4. Greenhouse Gas (GHG) Emissions.

5. Statewide Carbon Neutrality Requirements.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-26
Table 4.9 Summary of Air Quality Regulatory Agencies and Requirements Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/
Future
Impact
Impact on City's
Wastewater Facilities
Federal EPA  Federal CAA of 1970.
 CFR Title 40: Chapter I Protection of
Environment.
 Subchapter C: Air Programs:
» 40 CFR Part 50, National Primary and
Secondary Ambient Air Quality Standards.
» 40 CFR Part 51, Requirements for
Preparation, Adoption, and Submittal of
Implementation Plans.
» 40 CFR Part 52.21, Prevention of Significant
Deterioration of Air Quality.
» 40 CFR Part 53, Ambient Air Monitoring
Reference and Equivalent Methods.
» 40 CFR Part 58, Ambient Air Quality
Surveillance.
» 40 CFR Part 60, Standards of Performance
for New Stationary Sources.
» 40 CFR Part 61, National Emission
Standards for Hazardous Air Pollutants.
» 40 CFR Part 63, NESHAP for Source
Categories.
» 40 CFR Part 70, State Operating Permit
Programs.
» 40 CFR Part 98, Mandatory Greenhouse
Gas Reporting.
 NESHAP for POTW.

Current  Establishes standards
for implementation
plans to meet air quality
requirements.
 Establishes standards
for criteria and
hazardous air
pollutants.
 Establishes
requirements for GHG
emissions reporting and
reduction.
 Establishes standards
for primary hazardous
air pollutants.

State CARB  CAAQS. Current  Establishes standards
for criteria air pollutants.

California
State
Legislature
 AB 1807, Toxics Air Contaminant Identification
and Control (1983).
 AB 2588, Air Toxics "Hot Spots" Information and
Assessment Act (1988).
 SB 1731, Risk Reduction Audits and Plans (an
amendment to the "Hot Spots" Act) (1992).
 AB 617, Non-Vehicular Air Pollution: Criteria Air
Pollutants and Toxic Air Contaminants (2017).

Current/
Future
 Establishes standards
for hazardous air
pollutants.
 As part of
implementation, CARB
may establish new
emissions monitoring
and more restrictive
limits for TACs.
 AB 32, California Global Warming Solutions Act
of 2006.
 SB 32, California Global Warming Solutions Act
of 2006, Emissions Limit.
 Executive Order B-55-18 to Achieve Carbon
Neutrality.

Current  Establishes
requirements for GHG
emissions reporting and
reduction.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-27
Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or Agreement)
Current/
Future
Impact
Impact on City's
Wastewater Facilities
Local SBCAPCD  SBCAPCD Rules and Regulations:
» Regulation II, Permits - Operating and
Construction, New Source Review.
» Regulation IV, Prohibitions - General and
Source Specific Regulations.
 PTO No. 08390-R11 (for Santa Maria WWTP).

Current  Establishes standards
for air pollutant
emissions for Santa
Barbara County, that
the City's wastewater
facilities must comply
with.
 Establishes specific air
pollution emission
requirements for
equipment at the
WWTP.
 Santa Barbara CAP. Current/
Future
 Improve building
efficiencies and expand
usage of renewable
energy sources.

Notes:

CAAQS - California Ambient Air Quality Standards; NESHAP - National Emission Standards for Hazardous Air Pollutants; TAC - toxic air contaminant

4.4.2 Current Criteria Pollutant Regulations

4.4.2.1 Federal
The Federal CAA was put into law in 1970 to regulate and improve air quality in the United States. The CAA creates a comprehensive national framework designed to protect ambient air quality by limiting air emissions for both stationary and mobile sources. The CAA primarily regulates six common air pollutants which are referred to as "criteria air pollutants." Per the CAA, the EPA establishes National Ambient Air Quality Standards (NAAQS) for the six criteria pollutants to protect human health and welfare. These standards are codified in 40 CFR Part 50, National Primary and Secondary Ambient Air Quality Standards.

The six criteria pollutants are:
 Ozone.
 Particulate matter (PM) (PM10 and PM2.5).
 Lead.
 Carbon monoxide (CO).
 Sulfur oxides (SOx).
 Nitrogen oxides (NOx).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-28

4.4.2.2 State
The EPA requires states to adopt and enforce plans to achieve the NAAQS. As such, CARB has set CAAQS to enforce the NAAQS for the six criteria pollutants as well as four additional pollutants. The four additional pollutants include:
 Hydrogen sulfide (H2S).
 Sulfate.
 Vinyl chloride.
 Visibility-reducing particles (i.e., particles that reduce visibility for airport safety, scenic enjoyment, road safety, etc.).

4.4.2.3 Local
Air regulations are implemented locally by the SBCAPCD, which ensures compliance to safeguard air quality in the region.

There are two primary types of permits applicable to WWTPs: the Permit to Operate (PTO) and the Authority to Construct (ATC). The PTO authorizes the operation of equipment that emits pollutants and requires renewal every three years. For instance, the PTO for the City's WWTP, identified as PTO No. 08390-R11, is reevaluated triennially, with the most recent review conducted in September 2024.

The ATC permits the construction of new equipment or the modification of existing equipment that will emit pollutants and is renewed as needed based on the project's timeline.

The PTO comes with stringent requirements to ensure ongoing compliance with emission standards. This includes specific limits on pollutants such as NOx, CO, SOx, PM10, and PM2.5. There are also operational restrictions, including the volume of digester gas and propane that can be burned daily. The permit mandates proper maintenance and operation of equipment, and strictly prohibits the venting of digester gas except under breakdown conditions.

Monitoring and recordkeeping are essential components of compliance. Daily monitoring of digester gas and propane volumes combusted must be conducted using calibrated flow meters. Detailed records must be maintained, including daily volumes of fuel used, maintenance logs, and instances of leaks or H2S alarms. Additionally, annual reports documenting compliance with permit conditions must be submitted by March 1 of each year. These reports include data on emission levels, fuel usage, and any corrective actions taken. Compliance and enforcement mechanisms are in place to ensure adherence to the permit conditions. This includes the implementation of an SBC APCD-approved Inspection and Maintenance Plan, which details procedures for detecting and repairing leaks, maintaining equipment, and ensuring compliance with emission thresholds. Biennial source testing of emissions and process parameters is also required to verify compliance with emission standards.

4.4.3 Current Hazardous Pollutant Regulations

4.4.3.1 Federal
In addition to criteria air pollutants, the CAA requires the EPA to regulate emissions of 188 toxic materials defined as "hazardous air pollutants." Hazardous air pollutants are those suspected to cause serious health effects (such as cancer or birth defects) or adversely impact the environment. Hazardous air VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-29
pollutants are also referred to as "toxic air contaminants," TACs, or "air toxics." The EPA regulates emissions from air toxics by developing rules targeting specific industrial "source categories" under the NESHAP program. This program is codified under:
 40 CFR Part 61, NESHAP.
 40 CFR Part 63, NESHAP for Source Categories.

4.4.3.2 State
To reduce the emission of air toxics from stationary and mobile sources, CARB initiated the California Air Toxics Program in 1983 with the passage of AB 1807, TAC Identification and Control. Through the program, CARB has identified 200 toxic air pollutants and implemented 26 control measures for airborne toxics. The California Air Toxics Program was further developed with the passage of AB 2588 in 1987 and SB 1731 in 1992. The goals of AB 2588 include:
 Collecting toxic air emissions data.
 Identifying facilities with localized emission impacts.  Determining adverse health risks per methods developed by the California OEHHA.  Notifying impacted communities of significant risks.
 Reducing significant risks to acceptable levels.

In March 2015, OEHHA updated its health risk assessment procedure to better characterize exposure risks to children. Using the new procedures, the estimated risks increased up to six times those estimated with the former procedure, even when assuming no changes in air toxics exposure.

In 2017, AB 617, Non-Vehicular Air Pollution: Criteria Air Pollutants and TACs, was signed into law. The law established the Community Air Protection Program with the primary goal of reducing air pollution exposure in communities that experience high cumulative exposure to air pollutants, including air toxics.

In 2020, AB 617 was amended to update annual reporting of criteria air pollutant and TAC emissions data from facilities. In addition, the update established policies to improve emissions inventory data for better understanding of pollution sources and impacts. At the same time as the AB 617 updates, the AB 2588 "hot spots" program, which established a statewide program for inventorying air toxic emissions data from individual facilities, as well as requirements for risk assessments and public notification for those risks, was updated. As part of improving air toxic emissions reporting, the public's access to the data, and reduction strategies for priority communities, the updates to the CARB Emission Inventory Criteria and Guidelines and the Regulation for the Reporting of Criteria Air Pollutants and Toxic Air Contaminants (CTR) included:
 Expansion of the number of compounds to be validated for monitoring and reporting from a total of approximately 500 to over 1,700 for permitted waste facilities, including WWTPs.  Establishment of criteria for air monitoring and an approach for the waste sector (i.e., the "two-step" process) to identify a short list of toxics relevant to WWTPs.  Identification of strategies/timelines for emissions reductions (prioritizing overburdened communities).

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-30
Since most of the 1,700+ compounds do not have approved sampling or laboratory methods and have not been assessed by the OEHHA, health risks associated with these compounds cannot be quantified.

Thus, since the potential impacts are difficult to assess, they will not be included in this planning process.

4.4.4 Current Climate Change Regulations

4.4.4.1 Federal
The EPA's Mandatory GHG Reporting Rule (40 CFR Part 98) was adopted on October 30, 2009. The Reporting Rule explicitly states that centralized domestic wastewater treatment systems are not required to report emissions. However, any stationary combustion of fossil fuels taking place at a wastewater treatment facility may be considered a "large" source of GHGs if they emit a total of 25,000 metric tons (mt) or more of carbon dioxide equivalent (CO2e) emissions per year. Therefore, it is prudent for wastewater agencies to estimate their emissions relative to the reporting threshold.

4.4.4.2 State
Assembly Bill 32, Senate Bill 32, and Executive Order B-55-18 In September 2006, AB 32 Global Warming Solutions Act of 2006 was signed into law. AB 32 required CARB to act as the lead agency for implementing regulations requiring public and private agencies to reduce GHG emissions to 1990 levels by 2020. California met the AB 32 target of reducing GHG emissions to 1990 levels ahead of the goal.

Building on this success, SB 32 California Global Warming Solutions Act of 2006 was adopted in 2016 requiring the state to implement a target of reducing emissions by 40 percent below 1990 levels by 2030.

The intent of SB 32 was to set the state on track for achieving a reduction goal of 80 percent below 1990 levels by 2050. In addition to this, Governor Brown, at the time, issued Executive Order B-55-18 in 2018 to establish statewide carbon neutrality by 2045.

The GHGs regulated under both AB 32 and SB 32 that are most relevant to WWTPs are:
 Carbon dioxide (CO2).
 Methane (CH4).
 Nitrous oxide (N2O).

The legislation does not target wastewater treatment process emissions specifically, but it does cover electricity generating units and on-site general stationary combustion sources (e.g., engines, boilers, and flares). The City's WWTP currently operates flares and boilers.

Pursuant to AB 32, GHG estimates are based on CARB's Regulation for the Mandatory Reporting of GHG Emissions (Title 17, CCR, Sections 95100-95157). To align itself with the EPA's GHG Reporting Rule, CARB's regulation incorporated references from certain requirements of the EPA's Final Rule on Mandatory Reporting of GHGs (Title 40, CFR, Part 98). Specifically, Section 95100(c) of CARB's regulation incorporated those requirements promulgated by EPA as published in the Federal Register.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-31
CARB lists two thresholds that indicate whether WWTPs must report their GHG emissions. The reporting thresholds shown in Table 4.10 include emissions from both fossil fuel (i.e., natural gas and diesel) and non-fossil fuel or biogenic (e.g., biogas) sources. Note, the thresholds do not include emissions from emergency standby diesel engines.

Table 4.10 GHG Emissions Threshold for Reporting Years 2011 and Beyond Equipment Threshold
Electricity Generating Unit ≥10,000 mt CO2e per year
General Stationary Combustion ≥10,000 mt CO2e per year
The City's WWTP currently produces less than 10,000 mt CO2e per year and is, thus, not required to report.

Greenhouse Gas Cap-and-Trade Program
In addition to mandatory reporting of GHGs, CARB adopted a GHG cap-and-trade program that became effective in January 2012. This program states that agencies emitting 25,000 mt or more of fossil fuel-based (i.e., natural gas and diesel) CO2e emissions per year beginning in 2011 or any subsequent year will be capped and required to pay for allowances and eventually reduce their emissions over time. The City's WWTP does not exceed the GHG reporting threshold; therefore, the cap-and-trade threshold does not currently apply.

Statewide Carbon Neutrality Requirements
In 2021, at the Governor of California's request and in time for the next climate change scoping plan update, CARB began evaluating pathways for the state to achieve carbon neutrality by 2035, in advance of the 2045 target. This included strategies to reduce fossil fuel demand and supply and transition to 100 percent clean and renewable resources for all electricity retail.

4.4.4.3 Local
Under the published draft of the Santa Maria General Plan Update for 2045, there is language that seeks to align City of Santa Maria policy with statewide GHG reduction targets. There are no additional GHG ordinances from the local level.

4.4.5 Current Practices

4.4.5.1 Criteria Pollutants
The City operates anaerobic digesters to treat its biosolids. CH4 and CO2 are generated during the digestion process. The City primarily burns the biogas using a boiler (Boiler 1), or in one of two waste flares. The waste flares burn excess biogas not required by the boiler. Each flare is equipped with a pilot flare; and each are fueled by propane gas as a back-up. A second boiler has been exempt from the regulations. An iron sponge scrubber serves as a standby H2S treatment system. The iron sponge scrubber is not operated under standard conditions.

The local regulations, enforced by the SBCAPCD, take into account the state and federal rules on criteria and hazardous pollutants. The existing permit to operate the flares, digesters, and boilers onsite is VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-32
PTO No. 08390-R11. The permit regulates the amount of criteria pollutants and the quantity of fuel that may be burned.

Table 4.11 lists the permit potential to emit for recognized air quality pollutants under PTO No. 08390-R11.

Table 4.11 Santa Maria Permit Potential to Emit Limits - Tons Per Year Equipment NOx ROC CO SOx PM PM10 PM2.5 Maximum Fuel Input (mmBTU/hour)
Flare 1 1.38 1.75 7.5 4.55 0.41 0.41 0.41 4.63
Flare 2 3.56 4.52 19.37 11.74 1.05 1.05 1.05 12.0
Flare 1 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Flare 2 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Boiler (digester gas) 0.4 0.06 3.26 2.46 0.08 0.08 0.08 2.51 Boiler (propane) 0.4 0.06 3.26 0.18 0.08 0.08 0.08 Exempt Iron Sponge Scrubber - 0.01 - - - - - -
Total 4.02 4.66 22.94 14.30 1.15 1.15 1.15 N/A
Notes:
mmBTU - million British Thermal Units
In addition to the limits, H2S is monitored once daily using an ambient monitoring system. The current limit for H2S at atmospheric conditions is 796 parts per million as volume (ppmv). The typical daily average concentration of H2S in the treated biogas in 2023 is 197 ppmv. H2S concentrations are reduced due to the injection of ferrous chloride into the digesters. In the case of failure or downtime of the ferrous chloride injection system, the iron sponge scrubber is brought online to keep H2S concentrations below permitted limits.

In addition to the maximum fuel input shown, there are maximum volume limits for monthly digester gas production and for propane gas for boilers and flares.

The permit stipulates the maximum biogas flow to each of the flares and Boiler No. 1. See Table 4.12 for details. The total average biogas production in 2023 was 161,335 standard cubic feet (scf) per day. Typical biogas usage in Boiler No. 1 in 2023 was 35,400 scf per day. The combined energy that the flares can burn each day is 291.5 mmBTU/day.

Table 4.12 Flares and Boiler No. 1 Permitted Flows
Equipment SCF per Day SCF per Minute
Flare 1 185,200 128.6
Flare 2 293,000 203.5
Flare 1+2 Pilots (propane) 1800 1.25
Boiler 1 Maximum Flow (digester gas) 100,000 69.4
Boiler 1 Maximum Flow (propane) 24,000 16.6
Stringent monitoring is required for the system; annual reports are due to the SBCAPCD with information regarding waste gas production, flaring, and H2S concentrations.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-33

4.4.5.2 Greenhouse Gas Emissions
As discussed above, under California AB 32, an emission threshold of 10,000 mt of CO2-equivalents per year is in place. As a stationary source, the Santa Maria WWTP currently does not exceed that threshold and does not produce inventories for the state.

4.4.6 Future Air Quality Regulations
In the future it is expected that there will be more restrictive limits for TACs, NOx, CO2, fluorinated gases, and CH4. This may limit future on-site biogas management options (e.g., cogeneration). Increasing biogas production (such as through increased co-digestion) may trigger new source review and potential limits on production to limit criteria and TAC emissions, including odors. Because N2O is about 300 times more potent than CO2 as a greenhouse gas and is released by activated sludge treatment, there may be future regulations associated with off-gassing from this treatment technology. However, for the current planning horizon it is not anticipated that such regulations would be implemented.

This Master Plan assumes increasingly stringent emissions requirements and the need for emissions control equipment for stationary combustion units and other applicable process units, as thresholds are met.

4.4.7 Treatment Implications
As discussed in the previous sections, there is an ongoing push to reduce GHG emissions and improve air quality in the state of California. With regards to future treatment trains, there are multiple avenues to consider.

The emphasis by Santa Barbara County and SB 1383 to reduce landfill diversion will likely result in a treatment train that keeps anaerobic digestion. In this case, this would mean that biogas flaring and utilization of biogas as a boiler fuel would continue, and the beneficial use of biogas to generate renewable energy could be considered. As such, the criteria pollutants regulated under the existing permit would remain in effect. Currently, the City complies with the permit, and can expect to do so with standard maintenance and monitoring of its existing gas flaring system. The potential for stricter criteria pollutant laws may result in more scrubbers or the inclusion of more efficient flares and boilers.

Upgrading equipment also means that potentially stricter GHG emission limits may be reached in the future.

However, if anaerobic digestion is not incorporated as part of the future treatment train, then biogas will not be produced and beneficial use of the gas and flaring will not be implemented. Accordingly, the compliance burden of current and future air quality regulations will be reduced with respect to biogas, but may be increased depending on the method used to condition the plant biosolids prior to trucking and disposal.

Other design considerations include providing best management practices for the reduction of N2O and other non-regulated process emissions will be incorporated during the preliminary and final design of the selected treatment technologies.

In order to align the WWTP with state targets for decarbonization and clean energy, the City is currently constructing a solar power installation on the east side of Black Road as part of the WWTP upgrades.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-34

4.5 Water Reuse
Water reuse is being broadly implemented in California and other states as a strategy to utilize wastewater plant effluent for beneficial use. The potential regulatory requirements are key to consider during the planning horizon. This section presents an overview of the regulatory setting and current reuse regulations. A more detailed evaluation is presented in Volume 7 - Water Reuse and Disposal.

4.5.1 Regulatory Setting and Overview - Water Reuse
Table 4.13 summarizes the current regulations for water reuse.

Table 4.13 Summary of Water Reuse Regulatory Agencies, Legislation, and Requirements Regulation
Level
Enforcement
Agency
Requirement
(Regulation, Code, Applicable Policy, or
Agreement)
Current/Future
Impact
Impact on City's Wastewater
Facilities
Federal EPA  Safe Drinking Water Act
 CWA (1970)
 2012 Guidelines for Water Reuse
 Water Reuse Action Plan
Current/
Future
 Provides guidelines and
frameworks for reuse
networks on a
state-by-state basis.
 No actual regulatory
framework for reuse.

State DDW and
SWRCB
 California Code of Regulations, CCR
Title 22
 California DPR Regulations (2023)
 CCR Title 24
 California Water Code
 California Safe Drinking Water Act
Current  Establishes a framework
and standards for
multiple varieties of
recycled water.
 Sets quality benchmarks
and technologically
based targets for water
reuse.

California
State
Legislature
 AB 574, Potable Reuse (2017)
 SB 322, Amendment to SB 918- Water
Recycling (2013)
 SB 918, Water Recycling (2010)
Current/
Future
 Requires the State to
adopt and develop
uniform IPR and DPR
criteria.
 Develop technical and
science-based
recommendation for
potable reuse
implementation.

Notes:

DDW - Division of Drinking Water; DPR - direct potable reuse

4.5.2 Current Water Reuse Regulations

4.5.2.1 Federal
There are currently no federal standards regarding water reuse and water reclamation. The responsibility for regulation of water reuse has been delegated to individual states. Multiple states have begun to incorporate guidelines for water reuse.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-35

4.5.2.2 State
California has become one of the leaders of water reuse regulation. The SWRCB adopted multiple standards for water recycling under Title 22 and Title 27 in the CCR. These clauses are regulated by the SWRCB.

Title 22 - Recycled Water Standards
California state regulations have been some of the primary drivers in the water reuse domain nationwide.

The RWQCB provides permitting and implementation of statewide regulations.

There are different classes of recycled water that could be utilized in Santa Maria. For example, recycled water uses under Title 22 for non-potable reuse include:

1. Undisinfected Secondary:
a. Recycled water that has been oxidized but not disinfected:
i. Used in some agricultural irrigation where recycled water does not contact edible portions of the crops.

2. Disinfected Secondary-23:
a. Recycled water that has been oxidized and disinfected to achieve a median concentration of total coliform bacteria of less than 23 MPN per 100 milliliter (mL) utilizing the bacteriological results of the last seven days for which analyses have been completed, and the number of total coliform bacteria does not exceed an MPN of 240 per 100 mL in more than one sample in any 30-day period:
i. Used in agricultural and urban irrigation where recycled water does not contact edible portions.

3. Disinfected Secondary-2.2:
a. Recycled water that has been oxidized and disinfected to achieve a median concentration of total coliform bacteria of less than 2.2 MPN per 100 mL utilizing the bacteriological results of the last seven days for which analyses have been completed, and the number of total coliform bacteria does not exceed an MPN of 23 per 100 mL in more than one sample in any 30-day period:
i. Used in agricultural and urban irrigation where recycled water does not contact edible portions.

4. Disinfected Tertiary:
a. Recycled water that has been oxidized, filtered, and disinfected. The filtration and disinfection processes need to meet certain criteria, and the median concentration of total coliform bacteria measured in the disinfected effluent must not exceed an MPN of 2.2 per 100 mL utilizing the bacteriological results of the last seven days for which analyses have been completed and the number of total coliform bacteria does not exceed an MPN of 23 per 100 mL in more than one sample in any 30-day period. No sample shall exceed an MPN of 240 total coliform bacteria per 100 milliliters:
i. Can generally be used for the widest variety of applications, including landscape irrigation of publicly accessible areas, food crops, non-restricted recreational impoundments, dual VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-36
plumbed facilities, and various industrial and commercial processes where the water may come in contact with workers.

Beyond the non-potable uses are the potable uses, which include both IPR and direct potable reuse (DPR).

Standards for IPR, groundwater recharge to a potable water aquifer via surface spreading or injection, require at least tertiary treatment and disinfection (for surface spreading) and advanced treatment for groundwater injection. The standards for DPR are significantly greater. Potable reuse regulations establish extensive monitoring, treatment, and performance requirements. Table 4.14 notes examples of treatment standards for groundwater recharge (IPR).

Table 4.14 Title 22 Groundwater Recharge via Subsurface Injection Requirements for Potable Reuse Parameter Criteria
Enteric Virus 12-log Reduction(1)
Giardia Cyst 10-log Reduction(1)
Cryptosporidium oocysts 10-log Reduction(1)
TOC Maximum 0.25 mg/L in 95 percent of samples within first 20 weeks Maximum 0.5 mg/L in 20-week running average
Full Advanced Treatment RO and an advanced oxidation process that achieves 0.5 log reduction of 1,4-dioxane
Total Nitrogen 10 mg/L as N
Inorganic Chemicals in Table 64431-A(1) ≤MCLs
Radionuclide Chemicals in Tables 64442 and 64443 ≤MCLs
Organic Chemicals in 64444-A ≤MCLs
Disinfection Byproducts in Table 64533-A ≤MCLs
Lead and Copper ≤Action Levels
Constituents with NLs ≤NLs (2)
CEC Refer to Recycled Water Policy(3)
DDW-Specified Chemicals Case-by-Case Basis
Minimum Subsurface Relative Retention Time 2 Months
Notes:

RO - reverse osmosis
(1) Log reductions are from the point of raw wastewater to the point of finished water for public consumption. (2) Notable among which is the NDMA goal of 10 nanograms per liter or less. (3) Monitoring requirements for CECs are updated every five years following review by a science advisory panel. Requirements are published within an updated Recycled Water Policy.

The State has also established requirements for other types of potable reuse. These will be discussed in more detail in later sections of this master plan, specifically Volume 7- Reuse and Reclamation, where options for reuse will be considered.

Under Title 27 of the CCR, the combined code of regulations contains references to wastewater discharge in percolation ponds. The exemptions that permit the WWTPs to operate their percolation ponds are:
 If the applicable RWQCB has issued a WDR for the site.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-37
 If the discharge is in compliance with the applicable water quality control plan.  If the wastewater is not a hazardous waste as defined by clauses in Title 22, Chapter 11, Division 4.5 of the CCR.

Legislative Trends
Concerns about groundwater and surface water supplies persist in Santa Maria, and the Central Coast. The agricultural economy, the Mediterranean climate, and changing water supply conditions as part of a changing climate all suggest that recycling water may be an effective tool to reduce water demand in the City.

There are a number of state legislative and county-wide initiatives to reduce water consumption:
 Santa Barbara CAP Measure - Reduce per capita potable water consumption by 1.05 percent by 2030 and 1.58 percent by 2035.
 State SB 1157 - Reduce indoor residential water use to 42 gallons per capita per day.  California Sustainable Groundwater Management Act - Protect groundwater resources and reduce overdraft.
 Executive Water Supply Strategy - 1.8 million acre-feet of recycled water to be produced by 2040.

The existing legislative initiatives shown above indicate that recycled water and water reduction is a core component of California water policy.

4.5.3 Current Practices
Currently, Santa Maria treats the wastewater to Title 22 "Undisinfected secondary" treatment standards.

All water entering the WWTP is treated and then disposed of to the percolation ponds. No recycling is performed.

4.5.4 Treatment Implications
The regulations and legislation discussed above indicate that water reuse will continue to be important in the state. Due to the groundwater basin adjudication, it is unclear if there is a benefit for the City to pursue water reuse. As for now, the current percolation pond operation is acceptable and continued percolation should be incorporated into future planning.

However, in case of stricter mandates in the future, it is important to consider space and flexibility for tertiary water treatment trains such as filtration or disinfection in the planning process.

The opportunities for consideration of reuse may include:
 Identification of non-restricted crops that can be irrigated with current water quality (undisinfected, secondary).
 A disinfection/filtration tertiary process to expand irrigation beneficial uses for agricultural and/or urban customers.
 Alternative uses if some level of TDS removal via advanced treatment, such as reverse osmosis, becomes necessary in the future.

As noted, recycled water opportunities are further investigated in Volumes 7 and 13 of this Master Plan.

VOLUME 2 / CHAPTER 4: REGULATORY REQUIREMENTS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 4-38

4.6 Key Takeaways
The updated General WDR permit issued in June 2023 has prompted the City to improve their treatment operations to attain stricter water quality standards. The planned improvements will not only need to comply with the updated permit, but also consider a shifting regulatory landscape in the state of California.

In addition, changing biosolids, air quality, and water reuse regulations play an important role regarding what should be included in future plant expansions.

Table 4.15 summarizes the category of concern and the potential implications for future treatment at the WWTP facility.

Table 4.15 Summary of Regulatory Requirements
Category Treatment Implications
Water Quality  More stringent limits for effluent constituents such as TDS, Nitrogen, TSS, and BOD will require changes to treatment.
 Nitrogen removal technologies such as Activated Sludge in its various configurations should be considered.
 Stringent monitoring will be needed for future and current constituents at the effluent discharge point.

Biosolids  Digestion or other ancillary treatment technologies that treat to higher quality levels should be considered.
 Alternatives for existing landfill diversion should be considered.  PFAS monitoring is already required, and microplastics monitoring may be required in the future, along with possible regulations for both.
 Participation in regional efforts for thermal processing of biosolids would be beneficial to provide flexibility to position for possible future regional treatment systems required for addressing PFAS or other disposal factors.

Air Quality  Consider phasing-out/replacement of the existing gas flaring system and potential offsets for pollutants or the addition of additional gas treatment systems.  Beneficial use of excess biogas.
 Renewable energy power sources should be considered.

Water Reuse  Include space for tertiary disinfection/filtration treatment trains for improved quality to percolation ponds and for potential future reuse.
 Include space for advanced treatment trains for disposal to groundwater with IPR standards if required in future for TDS reduction.
 Continue use of percolation ponds for as long as possible.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-1
CHAPTER 5 POPULATION, LOADING, AND FLOW

REQUIREMENTS

5.1 Purpose
The purpose of this chapter is to present population projections and to use these projections to develop projected influent wastewater flow quantities and characteristics through the year 2060 for the WWTP.

This chapter assesses historical loading/flows, peaking factors, and wastewater characteristics. The flow quantities and characteristics projections are used as a basis for the design criteria in this update of the Master Plan.

5.2 Background
The City Service area is about 20 square miles. Within this area the sewer collection system conveys wastewater from the east almost entirely by gravity to the west, where the WWTP is located. There is one small lift station located in the southern area of the service area. The existing conveyance and sewer connection lines are depicted in Figure 5.1. Note that the location of the WWTP in the figure terminates on the western side of the service area, where the two 30-inch lines converge at the entrance to the WWTP on Black Road. Also note that the three large (>18 inch) trunk mains are located on county land outside the City's service area.

Source: City of Santa Maria Department of Utilities.

Figure 5.1 Existing Sewer Lines in the City of Santa Maria VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-2
The City has existing agreements with a neighboring county collection and treatment system, LCSD. In this partnership, the City receives about 0.2 mgd of net flow from LCSD (Santa Maria sends a small volume but receives 0.2 mgd more than what it receives). This agreement has a termination date of 2057. More details are included in Volume 2, Chapter 3.

The Santa Maria WWTP, has a septage receiving station. Permitted septic and septage haulers can discharge during operating hours and are charged a per gallon fee for each discharge. Existing permitted septage haulers service customers and areas within Santa Barbara and San Luis Obispo Counties. The City of Santa Maria WWTP is one of the only septage receiving stations within the two counties. The current volume of septage received is around 20,000 gpd on average, but can reach peaks of 35,000 gpd.

A major effort in the planning and development of facility expansions is the estimation of flow and loading projections. The City has furnished data and information relating to existing flows, land use, and population. Population projections will consider the existing service area and future development alternatives to determine per capita and base flow data.

5.2.1 Master Plan Basis
To set the basis for the treatment plant capacity, loading projections for BOD5, TSS, and ammonia nitrogen (NH3-N) were considered, in addition to flow for multiple scenarios that assess the effects of reduced flow patterns. The flow projections were developed based on population growth and existing per capita loading rates for each constituent.

5.2.2 Assumptions
For the purposes of this update to the Master Plan, the following assumptions were made to account for unknown information:

1. The historical and projected population of the Santa Maria community were assumed to be equivalent to the estimates found in the 2020 General Plan Update and the Santa Barbara County Association of Governments (SBCAG) 2050 Regional Growth forecast. Individual annual projections were developed using 10-year percentage growth rates from 2010 to 2060.

2. The agreement with LCSD will remain in effect, and the net flow projections to Santa Maria would scale at the same population growth rates as those developed for the remainder of the Santa Maria service area.

3. Septage receiving will increase by 100 gallons a day per year. In other words, every year, the total amount of septage received will be 100 gallons a day larger than the previous year.

4. Where BOD5 data is lacking and CBOD data is available, BOD5 was calculated based on historical CBOD to BOD5 ratios. Supplementing missing CBOD data through the use of a COD/BOD5 ratio is the only application of this ratio in this update to the Master Plan. The ratio utilized was 0.85.

5. Flow and loading projections were based on the 2018 through 2020 average loading per capita.

5.3 Population
This section summarizes the City's historic and projected collection system service area population.

Additionally, as mentioned, the City provides sewer services to the LCSD. The population projections in this section include areas within the City limits only.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-3

5.3.1 Historic Population
Historic population estimates for the City service area (and the area served to the LCSD plant) were developed based on the Santa Maria General Plan Update and the SBCAG Regional Growth forecast, which drew data from United States Census data, California population and land surveys, and Santa Barbara County data. The population estimates summarized in Table 5.1 were developed using 2000 to 2020 data as a basis. As shown in Table 5.1 the estimated total City population for the year 2020 was 107,407.

5.3.2 Projected Population
Also shown in Table 5.1 is the projected and historical population for Santa Maria.

The Santa Maria General Plan Update and the SBCAG forecast developed population, jobs, and housing projections until 2050. These values were used to project the population out to 2060, and provide an intermediate value for 2040. It is important to note that this projection accounts for reduced growth rates over time, meaning the population will grow more quickly initially before tapering off in later years. A population deviation of 10 percent is included to account for any potential changes in real-world conditions.

Table 5.1 Historical and Projected Population Growth
Year 2010(1) 2020(1) 2030(1) 2040(2) 2050(1) 2060(2)
Population 99,553 107,407 127,600 ± 12,000 135,350 ± 13,600 143,100 ± 14,500 152,200 ± 15,200 Notes:
(1) Sourced from Santa Maria General Plan Update (2020). (2) Estimated based on the Santa Maria General Plan Update (2020).

Figure 5.2 shows the envelope within which the Santa Maria population is expected to fall between 2020 and 2060.

Figure 5.2 Expected Population Growth to 2060
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-4

5.4 Service Area Land Use
The City provides wastewater collection service to residents, businesses, and other institutions within its service area. Table 5.2 provides the current acreage totals by land use classification within the City limits.

This table is based on data from the 2020 General Plan Update. The City currently provides sewer service to the majority of the existing acreage within the City limits.

Table 5.2 2020 Santa Maria Land Use
Land Use Type Existing Acreage(2) Percentage of City Total Residential 3,486 27.3
Commercial 948 7.4
Industrial 1,082 8.5
Airport 1,411 11.1
Public/Institutional 1,408 11
Conservation and Agricultural 1,828 14.3
Other(1) 2,589 20.3
Total 12,752 100
Notes:
(1) Other indicates vacant or private right-of-way land. (2) Source is from the 2020 General Plan Update.

The largest land-use category is residential, occupying the most significant portion of the city land use.

However, the remainder of land-uses are evenly distributed. As discussed elsewhere in these chapters, Santa Maria is a significant agricultural community, and thus the wastewater flows associated with agricultural growth, or conversion of agricultural land to residential, should be considered.

Future alternatives discussed in the 2022 General Plan Update Technical Memorandum indicated increases in agricultural and commercial land. Volume 2, Chapter 3 provides a more extensive look at land use.

5.5 Wastewater Flows
This section summarizes the existing and projected wastewater flows for the City wastewater collection system. Historical wastewater flows, as well as data obtained as part of recent sampling programs, are presented. Finally, future wastewater flow projections are presented.

5.5.1 Wastewater Flow Components
Table 5.3 presents definitions of commonly used terminology in the wastewater collection system analysis and evaluations conducted as part of this project. Wastewater flows vary according to the season.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-5
Table 5.3 Wastewater Collection System Commonly Used Terminology Term Definition Purpose
BWF The average base wastewater flow occurring during the dry season, between the months of May and October.

Used for permitting and to understand base
flows into the system without addition from wet
weather patterns.

AAF The average flow that occurs on a daily basis averaged for one year, including periods of dry and wet weather
conditions.

Sizing of unit processes or for performing
economic analysis of alternatives.

PDWWF The peak wet weather inflow over a 24-hour time period resulting from a rainfall event.

Sizing of hydraulic facilities, some liquid stream
facilities, and flow equalization facilities.

PHWWF The hourly peak of wet weather inflow over a one-hour time period.

Sizing of hydraulic facilities, some liquid stream
facilities, and flow equalization facilities.

AAL The average load occurring during the dry season,
typically between the months of May and October.

Used for permitting and to understand base
loads into the system without addition from wet
weather patterns.

ADMML The average daily organic, nitrogen or suspended solids load occurring during the maximum load month of the
year. This is calculated as the maximum 30-day average
for the year. The maximum monthly load does not
necessarily occur during the same period as the maximum monthly flow.

Sizing of secondary treatment facilities, sludge
thickening facilities, and anaerobic digesters.

Notes:

AAF - average annual flow; AAL - average annual load; ADMMF - average daily maximum month flow; ADMML - average daily maximum month load; BWF - base wastewater flow; PDWWF - peak average daily wet weather flow; PHWWF - peak hourly wet weather flow

5.5.2 Historic Flows

5.5.2.1 Annual Flows
Before discussing existing and future flows that were developed for this update to the Master Plan, it is important to first take a look at historical flows and trends over the last several years. The City provided historical influent flow data at the WWTP for period of 2018 through October 2023, with more data available through their existing reporting programs.

The WWTP monthly annual average flows for the five full-year data sets between 2018 and 2022 of 6.8 to

7.4 at the WWTP are summarized in Table 5.4.

Table 5.4 2020 Historical Flows Per Capita
Year(1) AAF at WWTP(2) (mgd) Annual Flow Per Capita (gpcd) 2018 7.39 69.9
2019 6.80 64.2
2020 7.30 66.6
2021 6.95 63.3
2022 7.31 66.4
Average 7.15 66.1
Notes:
gpcd - gallons per capita per day
(1) Population sourced from https://www.census.gov/ data. (2) Data supplied by City. Includes net flow from LCSD, septage flow, and tracks all other flows into the plant.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-6
Monthly average flows provide a glimpse of how the seasons and changing weather patterns affect the influent flow into the WWTP. Figure 5.3 provides the average flow per month over the last five years. In Santa Maria, contrary to other communities, monthly average flow increases in the summer months, and decreases in the winter months. This is an inverse correlation to precipitation, which is shown by the orange line in Figure 5.3. The anomaly is mainly due to the harvest season, during which there is significantly more crop processing and more seasonal workers employed by the agricultural community to help with the crop harvesting. The harvest season also correlates with higher wastewater flows from significant industrial users who discharge more wastewater from agricultural processing.

Figure 5.3 Average Monthly Flows to Santa Maria WWTP (2018-2022)

5.5.3 Peak Flows

5.5.3.1 Peak Daily Flows
The peak daily flows are important for sizing hydraulic facilities. Similar to the annual average, understanding the peak daily flows entering the plant on a monthly basis helps to size individual processes and treatment units. From this information, the peaking factor for each month of the year can be calculated. This section summarizes the peak 24-hour average flows (the days where the daily flow average sustained a maximum). Table 5.5 and Figure 5.4 illustrate the single maximum 24-hour flow observed in each month spanning from 2018 through 2023, and the associated peaking factor.

As shown, the peaking factors are lowest in the summer time (around 1.1) and highest in the winter time, corresponding to the rainy season. The largest peaking factor of 1.5 occurred in the month of January.

Table 5.5 Daily Average Monthly Maximum Flows From 2018-2023 Month Monthly Average Flow (mgd) Maximum Daily Average Flow (mgd) Peaking Factor January 6.9 9.3 1.4
February 7.2 10.2 1.3
March 7.4 9.9 1.3
April 7.1 8.5 1.2
May 7.0 9.1 1.5
June 7.5 9.3 1.1
July 7.6 9.0 1.1
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-7
Month Monthly Average Flow (mgd) Maximum Daily Average Flow (mgd) Peaking Factor August 7.6 9.5 1.1
September 7.4 10.2 1.3
October 7.4 9.6 1.2
November 7.1 9.7 1.4
December 6.8 8.9 1.2
Figure 5.4 Maximum Observed Daily Average Flow per Month Into Santa Maria WWTP (2018-2023)

5.5.3.2 Peak Hourly Flows
In contrast with the section above, the following peaking factors compare the highest hourly peak flow observed in a given month with the average flow for the respective month for the period of 2018 through 2023. The difference between peak hourly and peak daily average flows (presented in the previous section) is that this section finds the highest peak flow observed in a peak hourly loading event, while the previous section finds the highest daily average in a monthly period. Peak hour flows are used for confirming the hydraulic capacity of facilities.

Table 5.6 and Figure 5.5 summarizes the peaking factors relative to the annual average and the maximum peak hourly flows observed per month between 2019 through 2023. As shown, peak hour peaking factors ranged from 1.7 to 2.6. The highest hourly flow that the WWTP experienced over the 5-year period was

17.1 mgd, which occurred in the month of December. This peak flow mark corresponded with the maximum peaking factor of 2.6 observed over the time period.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-8
Table 5.6 Peak Hourly Monthly Maximum Flows From 2018-2023 Month Average Flow (mgd) Peak Hourly Flow (mgd) Peaking Factor January 6.9 15.0 2.0
February 7.2 12.9 1.7
March 7.4 14.9 2.0
April 7.1 12.7 1.8
May 7.0 12.9 1.7
June 7.5 11.5 1.5
July 7.6 11.9 1.6
August 7.6 12.5 1.7
September 7.4 13.3 1.7
October 7.5 12.6 1.8
November 7.2 12.8 1.7
December 6.8 17.1 2.6
Figure 5.5 Maximum Observed Hourly Flow per Month Into Santa Maria WWTP (2019-2023) VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-9

5.5.4 Modeled Flow Scenarios
Table 5.4, presented earlier, summarized the historical per capita wastewater generation within the City service area and the annual average flows to the WWTP. The annual average wastewater flow was variable over the five-year period, with an average of 7.15 mgd, and the per capita flow varied between 63 and 69 gpcd over the same period, with an average of 66.1. The observed fluctuations in the per capita flow and overall annual average flows are likely due to a number of factors including continued efforts towards water conservation, variable rainfall (inflow and infiltration), etc. For the purposes of this Master Plan update a per capita wastewater generation flow rate of 67 gpcd was assumed to represent status quo conditions; baseline, or no-change conditions.

5.5.4.1 Regulatory Considerations
The Regulatory Reduction flow projection scenario in Table 5.7 was developed using multiple sources, including the Santa Maria 2020 Urban Water Management Plan and the 2012 Utility Capacity Update, developed by Water Systems Consulting.

The impetus for this scenario was to find the water usage per capita of residential, commercial, and industrial sources, and then utilize known sewer flow data and water to sewer factors to develop a sewer projection considering mandatory reductions in per capita usage. In 2022, the California state Legislature passed an update to a 2018 water conservation law, mandating that residential water consumption must decrease to 42 gpcd by 2030. California Water Code §10609.4 states that until January 2025, the standard for indoor residential water use shall be 55 gpcd. Thereafter, until January 2030, the standard shall be 47 gpcd. After January 1, 2030, the standard shall be 42 gpcd. It is important that the State of California, in conjunction with this mandate, provides stipulations that give the City time to complete studies regarding communities and actual water usages. As a result, the Regulatory Reduction scenario is a low-end rate that may not ever be reached. However, it is important to consider with respect to future conservation and efficiency efforts.

5.5.4.2 Flow Projections
The projected sewer rates can be found by assuming only residential water usage declines, and industrial and commercial sources will remain at their existing levels of water consumption. The current 2020 water usage per capita, along with developed sewer to water usage factors are shown in Table 5.7.

Table 5.7 Sewer to Water Usage Factors With 2020 Water Consumption Data Source 2020 Water Usage Per
Capita (gpcd)
Sewer to Water Factor(1) 2020 Sewer Flow Per Capita
(gpcd)
Residential 60.5 0.825 50.0
Commercial 16.2 0.8 13.0
Industrial 6.8 0.6 4.0
Total - - 67
Notes:
(1) Appendix R illustrates how the Sewer to Water Factor Flow for industrial users was determined.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-10
The current 2020 sewer flow per capita, using the factors shown in Table 5.8, corresponds to the observed flow of 66.6 gpcd. By reducing the residential water usages linearly to 2060, we can project a per capita sewer flow considering the mandatory cuts that will be enforced in the time frame of this Master Plan.

When applying the sewer factors and the mandatory cuts shown for residential only, we obtain a total sewer flow rate of 51 gpcd. For conservative estimates, we assume 50 gpcd for the following flow projections.

Appendix R illustrates how the industrial sewer to water factor was determined.

In order to project future flows to the WWTP and to account for climate change, continued water conservation, and other potential reductions in wastewater flows, three per-capita wastewater flow scenarios were considered in addition to the "no-change" alternative discussed above. These are presented in Table 5.8 and result in a per-capita flow ranging from 50 gpcd to 67 gpcd.

Table 5.8 Flow Reduction Scenarios for Projection Modeling Scenario Description Per Capita Flow
(gpcd)
No-Change Wastewater flows will on-average remain the same until 2060. The 2018-2020 average per-capita rate will be projected as the baseline. 67 Mild Reduction Wastewater flows, due to mild droughts, and continued water conservation compliance, will reduce by 7 percent on average by 2060. 60 Moderate Reduction Wastewater flows, due to moderate droughts, along with stringent water conservation compliance, will reduce by 14 percent on average by 2060. 55 Regulatory Reduction Residential usage is mandated to reduce to 42 gpcd, corresponding to a 50-gpcd flow.
50 Therefore, for the purposes of this Master Plan, it was decided to estimate future wastewater flows based on the four per capita flow scenarios presented in Table 5.8. The lowest flow condition, corresponding to the Regulatory Reduction scenario shows a per capita flow value of 50, as noted, it takes into account the 2030 goal of 42 gpcd and assumes some increase based on contributions from industrial and commercial customers that brings up the value to 50 gpcd. All three scenarios below the "no-change" scenario are more conservative than the historical per capita rates and would include potential higher flow from non-residential users. Each of these scenarios was modeled to determine the projected future flowrates, presented below.

5.5.5 Wastewater Flow Factors
In order to develop the wastewater flow projections, the aforementioned per capita flow was utilized along with the previously developed population projections. The population projections take into account the expected growth in the City and assign individual wastewater flow factors on a per person basis.

5.5.6 Buildout Determination
On account of the Santa Maria General Plan Update, the provided horizon for buildout is 2045, wherein the General Plan shall allocate and permit sufficient space and buildings for the City's expected growth. As such, the plan allocates a minimum of 16,000 housing units, and a minimum of 8,500 jobs to be acquired by that timeframe. The WWTP must be able to accommodate the additional flow expected from such a buildout.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-11
Since this chapter assesses the growth to 2060, the projected total populations found in the General Plan have been extrapolated for 15 additional years, at modest growth rates. This will allow for a conservative estimate of what will be required for the City's WWTP, using per capita flows.

5.5.7 Wastewater Flow Projections
Figure 5.6 illustrates the AAF projections to 2060 considering the four conservation scenarios. The following figure depicts the increase in flow purely as a result of population growth and excluding any LCSD or septage flows.

Figure 5.6 Flow Projections With Selected Scenarios

5.5.8 Contributing Agency Flows
The two primary contributing entities to Santa Maria WWTP influent are LCSD, currently under agreement, and septage contributors. Per the assumptions, this projection assumes that septage and LCSD will remain largely the same, but with modest increases. The modest increases will be 100 gpd per year for septage, and increased flows of 0.001 mgd per year from LCSD. It was assumed that these contributors would not be subject to the water conservation restrictions and were therefore increased linearly in this modeling effort, as shown in Figure 5.7. Both of these contributing flows are minor compared to the City service area flows and not expected to impact the overall flow projections.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-12
Figure 5.7 Flow Projections of Contributing Agency Flows

5.5.9 Total Flows
This projection accounts for both the assumed growth in LCSD flows, and the projected increase in septage. The total projected flows estimated with population and considering the conservation scenarios are shown in Figure 5.8.

Note that the total flow is expected to reach 10.3 mgd in 2060 assuming current trends continue; baseline or no-change scenario. For the mild reduction to 60 gpcd, the flow will reach about 9.4 mgd. For the most aggressive flow reduction scenario (Regulatory Reduction), the average annual influent plant flow is not expected to exceed 8.0 mgd. However, the organic, solids and nitrogen concentrations will continue to increase as flows decrease and the population increases. This is discussed in the next section.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-13
Figure 5.8 Total Flow Projections at Selected Scenarios (Including Contributing Agency Flows)

5.6 Wastewater Loads
This section summarizes the existing and projected wastewater loads for the Santa Maria WWTP.

Historical wastewater loads were analyzed for the City service area only. Wastewater loading will provide the basis of design for the planned expansion.

5.6.1 Carbonaceous Biochemical Oxygen Demand/Biochemical Oxygen Demand Ratio
As noted in Volume 2, Chapter 4, the City is now under a new General Permit, which has set more stringent treated effluent limits.

Considering that CBOD was the previous reporting metric, a ratio comparing the two must be developed to assess the effect of future loads and permit requirements. The CBOD/BOD5 ratio has been tracked in both textbooks and projects of similar size to Santa Maria. A sampling event in December 2023 at the WWTP also tracked CBOD and BOD5. By comparing the ratio from the seven-day sampling event to historical values, and those reported in textbooks and research papers, the calculated value for use here is considered to be reasonably accurate.

Based on the sampling data and literature values, a 0.85 ratio between BOD5 and CBOD was used for this planning effort.

5.6.2 Historic Loading Characteristics

5.6.2.1 Average Annual Loading
The following indicates the loading characteristics into the WWTP from 2018 through 2022. Historical loading is separated on a monthly basis in order to track the seasonal variability of flow and loads to the WWTP.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-14
Figure 5.9 illustrates the loading of TSS, BOD5, CBOD, total Kjeldahl nitrogen (TKN), and NH3-N. The annual average design loading criteria for BOD5 and TSS upon which the WWTP was designed are also shown; both are approximately 33,000 pounds per day (lb/day). TKN and NH3-N are reported on a quarterly basis historically and thus are reflected as such in Figure 5.9.

Figure 5.9 Historical Monthly Loading Characteristics
Note that in the higher flow months from August to October, the design limit for BOD5 is approached.

This is a current metric and illustrates some of the existing challenges faced by the WWTP.

5.6.2.2 Maximum Monthly Loading
Maximum monthly loads are determined using historical data and peaking factors. Using average and maximum loads seen from 2018 through 2022, peaking factors can be developed for TSS, BOD5, TKN, and ammonia. TKN and ammonia have been reported quarterly on a historical basis, and thus only quarterly values were used to develop the peaking factors shown in Table 5.9.

Table 5.9 30-Day Maximum Peaking Factors for Wastewater Characteristics Month TSS BOD5 TKN Ammonia
January 1.88 1.56 1.47 1.17
February 1.33 1.28
March 1.23 1.31
April 1.19 1.42 1.66 1.14
May 1.27 1.21
June 1.46 1.40
July 1.23 1.43 1.55 1.09
August 1.34 1.42
September 1.26 1.15
VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-15
Month TSS BOD5 TKN Ammonia
October 1.40 1.43 1.37 1.17
November 1.51 1.23
December 1.18 1.17
Average 1.36 1.34 1.51 1.14

5.6.3 Contributing Agency Loads and Septage
The loads from LCSD and from septage are included in the per capita loading. Historical values reported for the WWTP include both sources, and as such are wholistically included in the per capita values.

5.6.3.1 Septage
It is important to track the septage loading, as septage varies over time, and can produce slug loads for the plant to treat. Table 5.10 shows the average and daily maximum BOD5 load entering the plant, and the impact of such loads as a percentage of the average incoming load. Note that the plant recorded BOD5 data for the septage concentrations between 2010 and 2015, but was not able to continue such monitoring thereafter. For the purposes of this Master Plan, it was assumed that the 2010-2015 BOD5 concentrations are representative of the period from 2018 through 2023. The plant continued recording septage flows to 2023. As indicated, on average, septage contributes about 2.2 percent of the incoming BOD5 load to the plant. During the 2008 plant expansion project, it was assumed that septage haulers would dump an average of 65,000 gpd with an average BOD5 concentration of 8,000 mg/L, resulting in a BOD5 load of 4,336 lb/day; significantly more than is shown in Table 5.10.

Further evaluation of the contributions of septage to the incoming BOD5 and nitrogen loads is underway.

Volume 13 Chapter 5 of this Master Plan provides an update on the additional analysis performed on the loading contributions from septage.

Table 5.10 Septage Loading Characteristics
Year Average Daily Septage
BOD5 (lb/day)(1)
Max Daily Septage BOD5
(lb/day)
Percentage of Average Daily
Loading(2)
2018 747 1,671 2.4%
2019 828 1,853 2.7%
2020 681 1,523 2.2%
2021 580 1,297 1.9%
2022 685 1,532 2.2%
2023 639 1,429 2.1%
Average 693 1,551 2.2%
Notes:
(1) Calculation based on the average BOD5 concentration for the years 2010-2015. (2) As compared to 2018-2023 average influent loads.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-16

5.6.3.2 Consolidation Loads
It was noted in Volume 2, Chapter 2 that the City of Guadalupe has received a suggestion from the Water Board that they consider pumping their roughly 0.5 mgd of wastewater to the Santa Maria WWTP for treatment, rather than treat it themselves. As of that date of writing this Chapter, flow and quality information from the City of Guadalupe has not been received, and therefore the impact of future loads from this source on the Santa Maria WWTP has not yet been accounted for.

5.7 Water Reuse/Disposal
Currently, the City sends all of their effluent to 15 percolation ponds for disposal and there is no off-site water reuse. All ponds are located within the property, and ponds in operational use are drained and refilled on a weekly to monthly basis to allow time for off-line ponds to dry out sufficiently for routine maintenance. As such, pond volumes vary throughout the year to account for seasonal and diurnal flow, along with offline periods. Appendix S includes an aerial view of the site that shows the current percolation ponds and their location relative to the treatment facilities.

In the most recent year, 2023 through 2024, the seasonal variation can be observed with net percolation rates. Net percolation accounts for average percolation and evaporation at the site, which was derived from an evaporation pan study conducted by GSI Water Solutions. Figure 5.10 illustrates the net percolation on a monthly basis in mgd for one full year from July 2023 through to June 2024.

Figure 5.10 Net Percolation Into the Percolation Ponds
The average net percolation into the ground for the one-year period was 7.1 mgd, with a seasonal high of 9 mgd in July. Overall, there was no net accumulation of volume in the percolation ponds, indicating that all incoming flow is able to percolate.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-17
However, moving forward and considering that the percolation ponds are aging, and their percolation rates have declined as solids accumulate within the soil, an additional pond area will be needed to address future flows. Further discussion of the existing pond condition and performance is presented in Volume 7 - Water Reuse and Disposal, together with a discussion regarding the additional pond area to be provided in the future and its location.

Volume 7 also includes a discussion on potential alternatives to provide recycled water as an option for treated effluent disposal.

5.8 Loading Projections

5.8.1.1 Projected Annual Loading
Historically, Master Planning focused on incoming flow as the metric for determining the need for WWTP expansions. That was a good metric when BOD5 and TSS concentrations were relatively stable. However, since increase of water conservation initiatives, WWTPs have seen declining flows and associated increases in organic, solids and nutrient concentrations. Accordingly, using the organics, solids and nutrient loads (expressed in lb/day) entering a WWTP has become a more accurate approach to assessing the need for treatment plant expansions, rather than considering flow alone. Consideration of flow is still required for assessing the hydraulic capacity of treatment facilities. Organic and nutrient loads (lb/day) produced by households should be relatively consistent and would be largely independent of the flow entering the sewer system from in-house uses such as bathing, cooking, washing, etc. As such, the per capita loading provides a reasonable measure of how the WWTP load will be expected to increase as the population increases. Using the values presented in Section 5.6, Table 5.11 presents the calculated historic loading per capita for TSS, CBOD, TKN, and NH3-N for the period of 2018 to 2020.

Table 5.11 Per Capita Loading Characteristics From 2018-2020 lb/day Per Capita 2018 2019 2020 Average
TSS 0.237 0.223 0.209 0.223
CBOD 0.239 0.223 0.229 0.230
TKN 0.042 0.040 0.041 0.041
NH3-N 0.027 0.030 0.029 0.029
Using the 2018 to 2020 averages from Table 5.11, the projected loading of TSS, BOD5, TKN, and ammonia was developed based on the population projects and is presented in Figure 5.11. A conversion factor of

0.85 (CBOD is 0.85 times smaller than BOD5) was used to estimate the BOD5 values based on the measured CBOD. The design averages from the 2008 expansion for the plant are also depicted to illustrate when the loading is expected to exceed the design values for the existing WWTP.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-18
Figure 5.11 Projected Annual Loading Characteristics
Based on the projected values, the BOD5 average design loading is expected to exceed the current plant capacity by 2031. This is important to note as any expansions will need to be operational by then, or other interim measures will need to be in place to maintain performance that meets the permit limits.

As discussed earlier, the existing plant already experiences BOD5 loads that are close to or at the design value (33,050 lb/day) during the peak agricultural season (August to October). This trend is expected to continue into the future, so there will be times between now and when the new plant is constructed that the plant will be overloaded and the effluent quality is expected to reflect this.

5.8.1.2 Projected Peak Loading
Using the peaking factors described in Section 5.6.2, we can determine the future peak flows using the projected annual loading values. The historical peak loading factors projected to 2060 are shown in Table 5.12, which will be used for planning purposes.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-19
Table 5.12 2060 Peak Loading Estimates
Constituent Historical Average Loading Factors 2060 Peak (lb/day) TSS 1.36 46,067
BOD5 1.34 55,083
TKN 1.51 9,508
NH3-N 1.14 5,012

5.8.2 Projected Concentrations
The anticipated concentrations of TSS, BOD5, and total nitrogen were estimated based on the calculated loads and the previously discussed per capita flow scenarios. Given the variability in the future flow projections (Figure 5.8), the concentrations will aid in determining removal efficiencies of individual treatment processes. As such, Table 5.13 indicates the projected concentration range for each parameter, and Figures 5.12 to 5.14 show how the concentrations are expected to vary for each flow scenario with time out to 2060.

Table 5.13 indicates, based on different flow projections, that TSS concentrations, for example, will range from 390 to 550 mg/L through to 2060. This means that removal efficiencies of plant process units shall be upwards of 95 percent for TSS by the target date of this Master Plan. Table 5.13 includes the required removal efficiencies of the three parameters to meet the permit limits.

Table 5.13 2060 Concentrations Across Flow Scenarios
Constituent Influent Concentration Range
(mg/L)
Regulatory Limit (2020 General Order)
(mg/L)
Required Removal Efficiency
to Achieve Limit (%)
TSS 390-550 30 94.5
BOD5 475-675 30 95.5
Total Nitrogen(1) 70-105 10 90.5
Notes:
(1) Total nitrogen includes TKN, nitrite, and nitrate.

This ultimately means that the future plant will need to achieve high removal efficiencies at different flow ranges, with up to 96 percent removal of BOD5 during the peak concentrations.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-20
Figure 5.12 Projected Annual TSS Concentrations Over Different Flow Scenarios Figure 5.13 Projected Annual BOD5 Concentrations Over Different Flow Scenarios VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-21
Figure 5.14 Projected Annual BOD5 Concentrations Over Different Flow Scenarios

5.9 Basis of Design/Summary
The flow and loading projections developed in this chapter will be used in subsequent chapters as the basis for the collection system and unit process capacity determinations. Table 5.14 summarizes the annual average flow projections and treatment capacity required for each constituent. The "mild reduction" flow scenario (60 gpcd) will be used as the basis and a conservative estimate. As shown in the table, the "mild reduction" flow scenario still results in a gradual increase in flow to the plant around

9.3 mgd (annual average) in 2060.

Table 5.14 Basis of Design for Average Loading and Flows to 2060 Year Flow (mgd) TSS (lb/day) BOD5 (lb/day) TKN (lb/day) NH3-N (lb/day) 2020 7.3 24,000 29,100 4,300 3,100
2030 8.0 27,000 32,800 5,000 3,500
2040 8.7 30,400 37,000 5,600 3,900
2050 9.1 32,300 39,200 6,000 4,200
2060 9.3 34,000 41,300 6,300 4,400
Table 5.15 lists the Basis of Design for Peak Loading and Flows to 2060. The "mild reduction" scenario (60 gpcd) was used as the starting point. The peak hourly flows were calculated based on a peaking factor of 2.0, which is the average of the maximums shown earlier. Peak loadings were based on the same peak loading factors shown above.

VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-22
Table 5.15 Basis of Design for Peak Loading and Flows to 2060 Year Flow (mgd) TSS (lb/day) BOD5 (lb/day) TKN (lb/day) NH3-N (lb/day) 2020 14.6 34,000 39,000 6,700 3,500
2030 16.0 38,000 44,000 7,600 4,000
2040 17.4 43,000 49,000 8,500 4,500
2050 18.2 45,000 52,000 9,000 4,800
2060 18.6 48,000 55,000 9,500 5,000

5.9.1 Timing for Plant Expansions to 2060
Based on the design basis information presented above, and understanding the timeline required for design, construction, and start-up of a new treatment facility, preliminary phasing trigger curves for annual average influent flow and loading were developed out to 2060. These are shown in Figures 5.15 and 5.16, respectively.

Figure 5.15 shows the flow-based trigger curve and indicates that two plant expansions are anticipated to address growth through 2060. A Phase 1 expansion coming online around 2033, followed by a Phase 2 expansion coming online about 20 years later. For each expansion, the anticipated duration for planning, design, and construction are shown. The Phase 1 expansion is currently in the planning phase and when constructed would take the plant capacity to a nominal 10 mgd. Under the "no change" per capita flow scenario, planning for the Phase 2 expansion to increase the hydraulic capacity to 11.5 mgd would need to begin in 2042.

Figure 5.15 Trigger Curve for Phased Plant Expansions to 2060 Based on Flow VOLUME 2 / CHAPTER 5: POPULATION, LOADING, AND FLOW REQUIREMENTS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 5-23
Corresponding constituent loads to the plant with time are shown in Figure 5.16. The dominant constituents are BOD5 and TKN. Completion of the Phase 1 expansion around 2033 corresponds to approximately when the current plant capacity will be exceeded. The Phase 1 expansion will increase BOD5 capacity to about 43,000 lb/day, which should carry the plant through to 2052 with about 10 percent remaining capacity when the Phase 2 expansion comes on line. Phase 2 will increase the BOD5 capacity further. The TSS loads will be addressed as part of the BOD5 load increases. For nitrogen removal, the Phase 1 plant will be designed with a TKN capacity of 6,600 lb/day. This should be sufficient to treat all loads to the plant through 2052, with about 10 percent excess capacity remaining when the Phase 2 expansion comes online.

Figure 5.16 Trigger Curve for Phased Plant Expansions to 2060 Based on Load VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-1
CHAPTER 6 BASIS OF COST ESTIMATES AND FINANCIAL

PLANNING CONSIDERATIONS

6.1 Purpose
The purpose of this chapter is to summarize the factors, assumptions, and methodology used for estimating O&M and capital costs for the update of the Master Plan. In addition, the methodology used for producing a life-cycle cost analysis to compare alternatives is summarized.

6.2 Background
This Master Plan, when completed, presents an updated plan that meets the expansion and replacement needs of the City's water treatment systems until 2060. Consistent assumptions and criteria for development of O&M and capital costs and life-cycle cost analyses are necessary to facilitate fiscal planning.

6.3 Level of Accuracy
The costs shown herein are estimates and are prepared as guidance for project evaluation and planning purposes using limited information available at the time of the estimate. More accurate and detailed cost estimates should be prepared during the preliminary design phase of each project in which alternative analyses would be conducted to determine the best alternative for the City using the most up-to-date information at that time. The criteria presented in this chapter were used to develop total costs for each project as a planning level estimate. For this reason, based on AACE International's definitions of the five "class estimates" in AACE International Recommended Practice No. 18R-97 (see Appendix T), the classification of costs presented in this update of the Master Plan are Class 4 estimates. The expected accuracy of any estimates included herein is 50 percent over the estimate to 30 percent under the estimate.

6.4 Operations and Maintenance Costs
O&M costs include the labor, supplies, and utility costs for operations, preventive and corrective maintenance, inspections, and repair and replacement of parts. O&M costs are based on the information provided by the following:
 Historical costs from recent Carollo Engineers (Carollo) projects.  Vendor-supplied costs.
 Costs supplied by City staff (i.e., power, labor, chemicals, and propane gas).  Calculations as necessary to supplement other sources.

VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-2
The cost estimates are generally based on applying the above information to flow diagrams for main process systems, plant schematic layouts, and equipment lists that will be developed for the integrated update of the Master Plan. O&M costs are escalated for inflation as described in the capital cost section that follows.

6.5 Capital Costs
Capital costs consist of all the items that will be constructed/purchased for the projects that are being evaluated for the update of the Master Plan. The direct cost of each equipment item or process area will be based on the following:
 Vendor-quoted information.
 Cost curves based on historical costs from other Carollo projects or scale up or scale down of similar sized projects.
 Scale-up of prior construction costs to account for inflation, using existing and historical Engineering News-Record factors to scale up costs to 2024 dollars.
 Quantity take-off and unit prices when applicable information is necessary and available.

For most projects, depending on applicability, general factors will be added to the direct costs derived from the information listed above. These factors include the following:
 The costs of site work and yard piping, and electrical and instrumentation are estimated as percentages of the subtotal direct cost. Typical percentages are 15 percent for site work and yard piping and 20 percent for electrical and instrumentation, respectively.  The contingency is an amount added to the construction cost estimate to provide for undefined project elements and to reduce the risk for underestimation. The contingency usually ranges from 0 to 30 percent. For planning level estimates, which is the case here, the contingency used is 30 percent of the total direct cost.
 The added amount for general conditions includes the costs of mobilization/demobilization, bonds and insurance, contractor temporary project facilities and supervisory personnel, testing, start-up, and other constraints. A general conditions allowance of 12.5 percent of the total direct cost plus contingency is added.
 General contractor overhead and profit refers to the general contractor's home office overhead and profit. It is estimated to be 15 percent of the subtotal of the above costs.  The cost of the project at approximate mid-point of construction is predicted by escalating current costs. Over the last 50 years, the average inflation rate determined by the Consumer Price Index (CPI) has been 3.7 percent. For the 12-month period ending May 2026, the annual inflation rate as determined by the CPI was 4.2 percent, higher than where the Federal Reserve would like it to be.

Given that the Federal Reserve is maintaining a restrictive monetary policy to reduce inflation, it seems reasonable for planning purposes to use the historical rates to estimate escalation to the mid-point of construction. Accordingly, for this Master Plan, a value of 3.7 percent will be used.  Based on the sales tax rate for Santa Barbara County, sales tax is estimated at 8.75 percent on materials. The materials cost is assumed to equal 50 percent of the total direct cost and contingency.

VOLUME 2 / CHAPTER 6: BASIS OF COST ESTIMATES AND FINANCIAL PLANNING CONSIDERATIONS OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 6-3
 Bid market allowance is an escalation factor intended to account for unfavorable bidding conditions due to the current construction market. Because this project will not bid for another four years, it is not possible to predict the bidding environment at that time. Therefore, no bid market allowance will be included.
 Engineering, management, and legal are also included to determine the total project cost. This covers engineering, design and construction oversight costs, regulatory compliance, legal fees, as well as City administration expenses to oversee the project from design through construction. For this project, a factor of 32 percent of the total construction cost is used, including all above items.

6.6 Life-Cycle Costs
In order to evaluate different alternatives for upgrading the existing Santa Maria facilities, life-cycle cost analyses will be performed to determine which alternative is the best from an economic standpoint.

Life-cycle cost analyses determine the present worth of both capital costs and annual O&M costs for each alternative over a 30-year period. Factors considered in the life-cycle costs include the escalation rate, cost of capital (discount rate), capital loan period, and the life-cycle period. These values are as discussed and defined below:
 Escalation rate – equal to the inflation rate of 3.7 percent and used to estimate the capital cost at the mid-point of construction, and the annual increase in O&M costs.  Interest rate – the rate at which the loan for the capital amount will be funded. The City is considering loans from the federal Water Infrastructure Finance and Innovation Act (WIFIA) and the California Clean Water State Revolving Fund (SRF). WIFIA loan interest rates are determined by the United States Treasury yield curve on the day the loan is closed. For 2026, the 30-year US Treasury yield curve varied between 4.7 and 5.2 percent. Recent rates for SRF loans have been between 1.7 and 2.3 percent.

Because the WIFIA program loans substantially greater sums than the SRF program (limited to $50 million), and because of the magnitude of the anticipated cost to upgrade the WWTP, the interest rate for repaying a potential loan has been based on repaying a WIFIA loan; at an assumed interest rate of 5 percent.
 Discount rate – the difference between the rate of inflation and the interest rate for repayment of the loan to fund the project. Based on the above, the Discount Rate was set at 1.3 percent.  Loan period – equal to 30-years for a WIFIA loan.
 Life-cycle period – 30-years.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX A 1948 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN A-1
The 1949 aerial shows the wastewater treatment plant after its 1948 expansion. The below image indicates the whole area with the current City of Santa Maria property line included.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX B 1967 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN B-1
1967 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX C 1981 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN C-1
1981 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX D 2006 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN D-1
2006 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN
APPENDIX E 2016 HISTORICAL AERIALS
VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN E-1
2016 historical aerials show the extent of the plant, with and without the existing property line.

VOLUME 2 / BASIS OF PLANNING
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX F BIOLOGICAL RESOURCES MEMO

CARLSBAD
CLOVIS
IRVINE

LOS ANGELES

PALM SPRINGS

POINT RICHMOND

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
285 South Street, Suite P, San Luis Obispo, CA 93401 805.782.0745 www.lsa.net

MEMORANDUM
DATE: July 8, 2024
TO: Graham J.G. Juby, Carollo Engineers
FROM: Kelly McDonald, LSA Biologist
SUBJECT: Biological Resources Technical Memorandum for the Santa Maria Wastewater Treatment Project located at 601 South Black Road, Santa Maria, incorporated Santa Barbara County, California
The Biological Resources Technical Memorandum describes and documents potential biological resources—including special-status species, sensitive habitats, and other regulated resources of concern—within the Santa Maria Wastewater Treatment Project (project) located at 601 South Black Road, Santa Maria, Santa Barbara County, California (see Figure 1, all figures are provided in Attachment B). This document provides a summary of existing survey information, identifies potentially sensitive areas within the project site, and discusses the suitability of the site to support habitat for special-status plant or animal species. Currently, no site plans are available; therefore, an impact analysis and recommended mitigation measures regarding biological resources cannot be determined at this time. Once project plans are finalized, a detailed impact analysis will be prepared in order to support the California Environmental Quality Act (CEQA) process.

PROJECT SETTING
The project site is located in Sections 17, 18, and 20 of Township 10 North, Range 34 West on the United States Geological Survey (USGS) Guadalupe and Santa Maria, California, 7.5-minute topographic quadrangles map (see Figure 1). The project site is located within the city limits of Santa Maria and consists of four legal parcels (Assessor’s Parcel Numbers [APNs] 113-120-034, 117-191-010, 117-820-002, and 117-191-013) including APN 113-120-034, which is the Santa Maria Wastewater Treatment Plant (WWTP). The project site discussed in this document refers to all areas within the approximately 461-acre property where future permanent and temporary construction-related ground disturbance could occur.

Approximately one half of the project site is developed consisting of treatment ponds, pumps, tanks, clarifiers, and associated buildings with the WWTP. The remainder of the site consists mainly of agricultural row crops with sparse cover of ruderal vegetation along the margins of the fields (see Figure 2). Several irrigation ditches are also present along the road shoulders and in the WWTP.

According to historic aerial imagery, vegetation within the project site is subject to regular anthropogenic disturbance associated with the operations of the existing facilities (i.e., vegetation clearing, facility maintenance, and agriculture), and the site has remained in its current condition for more than 20 years. Adjacent parcels consist of agricultural fields to the north, south, east, and 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 2 west; Ray Road to the west; an irrigated pasture and Atlas Performance Industries (API) Trailers to the east; Santa Maria Railroad right-of-way to the south; and an auto wrecking yard is located to the west. There are no undisturbed open spaces in the vicinity of the project site.

The project site is located within the Central Coast Sub-region of the California Floristic Province (Baldwin, et al. 2012) and within the Corralitos Canyon watershed (Hydrologic Unit Code 180600080503). The project site is relatively flat with almost no topographic variation and is at approximately 168 feet above mean sea level. There are several irrigation ditches present within the project site; however, these features are maintained and have no downstream connection to other waters.

METHODS
Literature Review and Records Search
LSA Biologist Kelly McDonald conducted a literature review and records search on May 6, 2024, to identify the existence and potential for occurrence of sensitive or special-status1 plant and animal species in the vicinity of the project site. Federal and State lists of sensitive species were also examined. Current electronic database records reviewed included the following:
• California Natural Diversity Database (CNDDB – RareFind 5), which is administered by the California Department of Fish and Wildlife (CDFW). This database covers sensitive plant and animal species as well as sensitive natural communities that occur in California. Records from nine USGS quadrangles including and surrounding the project site (Oceano, Nipomo, Huasna Peak, Guadalupe, Santa Maria, Twitchell Dam, Casmalia, Orcutt, and Sisquoc) were obtained from this database to inform the field survey (CDFW 2024a). • California Native Plant Society’s (CNPS) Electronic Inventory of Rare and Endangered Vascular Plants, which utilizes four specific categories or “lists” of sensitive plant species to assist with the conservation of rare or endangered botanical resources. All of the plants constituting California Rare Plant Ranks 1A, 1B, 2A, and 2B are intended to meet the status definitions of “threatened” or “endangered” in the California Endangered Species Act (CESA) and the California Fish and Game Code and are considered by CNPS to be eligible for State listing. At the discretion of the CEQA Lead Agency, impacts to these species may be analyzed as such, pursuant to the State CEQA Guidelines Sections 15125(c) and 15380. Plants in Rank 3 (limited information, review list), Rank 4 (limited distribution, watch list), or that are considered Locally Unusual and Significant may be analyzed under CEQA if there is sufficient information to assess potential significant impacts. Records from the nine USGS quadrangles surrounding the project site were obtained from this database to inform the field survey (CNPS 2024). 1 For the purposes of this report, the term “special-status species” refers to those species that are listed or proposed for listing under the CESA and/or the Federal Endangered Species Act (FESA), California Fully Protected Species, and California Species of Special Concern. It should be noted that “Species of Special Concern” is an administrative designation made by the CDFW and carries no formal legal protection status. However, Section 15380 of the CEQA Guidelines indicates that these species should be included in an analysis of project impacts if they can be shown to meet the criteria of sensitivity outlined therein. 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 3 • United States Fish and Wildlife Service’s (USFWS) Information for Planning and Conservation (IPaC) Online System, which lists all proposed, candidate, threatened, and endangered species managed by the Endangered Species Program of the USFWS that have the potential to occur on or near a particular site. This database also lists all known critical habitats, national wildlife refuges, and migratory birds that could potentially be impacted by activities from a proposed project. An IPaC Trust Resource Report (USFWS 2024a) was generated for the project site. ○ Designated and Proposed USFWS Critical Habitat Polygons were reviewed to determine whether critical habitat has been designated or proposed within or in the vicinity of the project site (USFWS 2024b).
○ The USFWS National Wetlands Inventory was reviewed to determine whether any wetlands or surface waters of the United States have been previously-identified in the project site (USFWS 2024c).
○ eBird: eBird is a real-time, online checklist program launched in 2002 by the Cornell Lab of Ornithology and National Audubon Society. It provides rich data sources for basic information on bird abundance and distribution at a variety of spatial and temporal scales. eBird occurrence records within the project site and within a 5-mile radius around the project site were reviewed in May 2024 (eBird 2024).

In addition to the databases listed above, historic and current aerial imagery, existing environmental reports for developments in the project vicinity, and local land use policies related to biological resources were reviewed.

Field Survey
LSA Biologist Kelly McDonald conducted a general biological survey of the project site on May 9, 2024, to document existing site conditions and the potential presence of sensitive biological resources. The project site was surveyed on foot, and all plant and animal species observed were recorded. Suitable habitat for any species of interest or concern was noted, and general site conditions were photographed (see Attachment C, Site Photographs). The field survey took place on a clear sunny morning with weather conditions conducive to the detection of plant and animal species.

RESULTS
Vegetation
Dominant vegetation within the project site consists of developed areas and agricultural row crops.

Other vegetation and land cover types include irrigation ditch, disturbed/ruderal, and disturbed/ barren. The identification and characterizations of vegetation communities generally follow the plant community descriptions in the Manual of California Vegetation (Sawyer et al. 2009).

Anthropogenic areas are those areas that have been converted from their natural habitat to ones that are subject to ongoing human maintenance and disturbance; these areas include roads, road shoulders, and areas that are disturbed or maintained. The acreages of each vegetation community 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 4 and land cover type occurring in the project site are provided in Table A, below, and are shown on Figure 3.

Table A: Vegetation and Land Cover Types Within the
Project Site
Vegetation / Land Cover Type Acreage1
Irrigation Ditch 0.91
Disturbed/Ruderal 2.51
Disturbed/Barren 16.17
Agricultural Row Crop 219.98
Developed 221.55
Total 461.12
Source: Compiled by LSA (2024).
1 All presented acreages are approximate and based on geographic information system measurements.

A total of 52 vascular plant species were identified within the project site during the 2024 field survey. See Attachment D for a complete list of plant species identified within the project site. The following describes the vegetation and land cover types occurring within the project site:
• Irrigation Ditch: Areas classified as irrigation ditch are features constructed in the uplands that carry stormwater and agricultural runoff the project site and adjacent agricultural properties.

Ruderal vegetation lines portions of the bottom and banks of these features. Commonly observed species include short pod mustard (Hirschfeldia incana), lamb’s quarter (Chenopodium album), Canadian horseweed (Erigeron canadensis), and other annual grasses. • Disturbed/Ruderal: The area classified as disturbed/ruderal is a storage area for agricultural equipment and contains non-native ruderal vegetation such sweet yellow clover (Melilotus officinalis), cheeseweed mallow (Malva parviflora), and short pod mustard. Because the area stores equipment and has worn equipment tracks, this area is considered disturbed. • Disturbed/Barren: Areas classified as disturbed/barren lack vegetation or support a very sparse cover of ruderal vegetation, with non-native plant species such as annual grasses being the most frequently encountered plant species. Several other invasive, pioneering plant species were also observed in these areas. These areas that surround the agricultural row crop and irrigation ditches are subject to regular vehicle use and disturbance associated with agricultural activities; therefore, this area is considered disturbed.
• Agricultural Row Crop: Areas classified as agricultural row crops consist of active food crops such as strawberries.
• Developed: Areas classified as developed consist of paved areas, buildings, and other areas that are cleared or graded for anthropogenic purposes. The WWTP is considered developed and is surrounded by paved roads, ornamental landscaping, or crushed gravel. 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 5 Soils
According to the Natural Resources Conservation Service (NRCS) online soil survey of northern Santa Barbara County, 11 soil types are mapped within the project site, as shown in Figure 4 and detailed in Table B, below. Based on the NRCS soil survey, Camarillo sandy loam is the only soil type considered hydric and is a Major Land Resource Area (MLRA). MLRAs are geographically associated land resource units that contain information regarding the physiography, geology, climate, water, soils, biological resources, and land use of each MLRA. Information described in each MLRA is used in statewide agricultural planning (NRCS 2024).

Table B: Soil Type Information
Map Unit
Symbol Map Unit Name Parent Material Drainage Class Hydric Soil Ca Camarillo sandy loam, 0 to 2 percent
slopes, MLRA 14
Alluvium derived from
sandstone and shale
Somewhat poorly
drained
Yes
CuA Corralitos loamy sand, 0 to 2 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
CuC Corralitos loamy sand, 2 to 9 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
CuD Corralitos loamy sand, 9 to 15 percent
slopes
Sandy alluvium Somewhat excessively
drained
No
MnA Metz loamy sand, 0 to 2 percent
slopes
Alluvium Somewhat excessively
drained
No
SeD Salinas and Sorrento loams, 9 to 15
percent slopes
Alluvium Well drained No
StA Sorrento sandy loam, 0 to 2 percent
slopes, MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
StC Sorrento sandy loam, 2 to 9 percent
slopes
Alluvium Well drained No
SvA Sorrento loam, 0 to 2 percent slopes,
MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
SvC Sorrento loam, 2 to 9 percent slopes,
MLRA 14
Alluvium derived from
sedimentary rock
Well drained No
TdF Terrace escarpments, loamy Loamy alluvium N/A No
Source: Source: Web Soil Survey (NRCS 2024).

MLRA = Major Land Resource Area
N/A = not applicable
NRCS = Natural Resource Conservation Service
Wildlife
A total of 27 wildlife species were observed on or near the project site during the 2024 survey.

Observed species included California scrub jay (Aphelocoma californica), white-crowned sparrow (Zonotrichia leucophrys), and California towhee (Melozone crissalis). Each of the 27 species observed commonly occur in and around Santa Barbara County. A list of wildlife species observed can be found in Attachment D.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 6 Resident and migratory bird species likely use the project site for foraging and nesting. However, the project site does not possess any characteristics that would indicate locally significant stopover points for migratory species, including raptors or waterfowl. Several common and special-status species are known to move throughout lands in the general vicinity.

Special-Status Biological Resources
The Santa Barbara region supports various special-status natural communities, plants, and animals.

Attachment E provides tables that identify those special-status plant and animal species known to occur or that potentially occur in the vicinity of the project (based on the literature review and experience in the region) and includes detailed information about each species’ habitat and distribution, State and federal status designations, and probability of occurrence within the project site. As stated in the methodology section above, the background research included occurrence records from nine USGS topographic quadrangles surrounding the project site. A USGS nine-quadrangle search covers a large, variable geographic and topographic area containing numerous habitat types not found within or around the project site. Special-status species that were observed or determined to potentially occur in the project site based on availability of suitable habitat or other factors such as plucking posts, scat, nests, dens, etc., are discussed below. Species determined unlikely to occur in the project site based on these same factors are documented accordingly in Attachment E and not discussed further in this report.

The following subsections provide specific discussions for special-status natural communities, plant and animal species, and habitats of concern (including critical habitat, jurisdictional aquatic resources, wildlife movement corridors, and regional and local habitat conservation plans).

Special-Status Natural Communities
The CNDDB search identified occurrences of five special-status natural communities within the nine-quad search area: central dune scrub, central foredune, coastal and valley freshwater, southern California threespine stickleback stream, and southern vernal pool. 2 None of these special-status
natural communities occur within the project site. The closest documented natural community, southern vernal pool is located west of the Santa Maria Airport approximately 3 miles south of the project site.

No special-status natural communities or conservation areas exist within the project site or in adjacent parcels. The project site is completely isolated and distant from all special-status natural communities that occur in the region.

Special-Status Plants
Based on the analysis and rationale provided in Attachment E, the project site is not expected to support any special-status plant species. The project site is extensively disturbed, developed, and 2 The CNDDB uses sensitive vegetation community names described in the Preliminary Descriptions of the Terrestrial Natural Communities of California (Holland 1986). No new sensitive natural community records have been added to the CNDDB since the 1990s. Therefore, natural communities mapped by the CNDDB are limited.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 7 routinely maintained due to WWTP operations and longstanding agricultural practices. Such anthropogenic disturbances have greatly altered the natural hydrologic regimes and have either eliminated or greatly impacted the pre-settlement habitats needed to support the special-status plant species identified in the CNDDB and CNPS queries. As such, the specific habitats, soil substrates, or “micro-climates” necessary for special-status plant species to occur are absent within the boundaries of the project site. Based on site observations coupled with the habitat suitability analysis, no special-status plant species are expected to occur within the project site. It is also unlikely that any source populations exist in adjacent or nearby parcels.

Special-Status Animals
Based on the analysis and rationale provided in Attachment E, nine special-status animal species have a potential to occur within the project site. These special-status animal species are discussed in further detail below:
• California tiger salamander (Ambystoma californiense) – Santa Barbara County Distinct Population Segment (DPS) pop. 2 – federally endangered and State listed as threatened • California red-legged frog (Rana draytonii) – federally threatened and CDFW Species of Special Concern
• Western spadefoot (Spea hammondii) – proposed as federally threatened and CDFW Species of Special Concern
• Southwestern pond turtle (Actinmys pallida) – proposed as federally threatened and CDFW Species of Special Concern
• Tricolored blackbird (Agelaius tricolor) – State listed as threatened • Northern California legless lizard (Anniella pulchra) – CDFW Species of Special Concern • Coast horned lizard (Phrynosoma blainvillii) – CDFW Species of Special Concern • Western burrowing owl (Athene cunicularia) – CDFW Species of Special Concern • Yellow warbler (Setophaga petechia) – CDFW Species of Special Concern Nesting birds are also afforded special protections under the California Fish and Game Code and Migratory Bird Treaty Act, and a discussion of nesting birds is included in this section.

Federally Listed Species
Of the species listed above, two are listed under the Federal Endangered Species Act (FESA), and two are proposed for listing as threatened. The species and components of critical/suitable habitat are discussed below.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 8 California tiger salamander. California tiger salamander (CTS) is listed as an endangered species under FESA and stated listed as threatened under CESA. The species is endemic to California and inhabits the Central Valley with small populations around Santa Barbara and Sonoma counties. CTS is found in low-elevation grassland-oak woodland communities of the valleys and foothills from near sea level up to 3,940 feet in elevation. Females lay eggs in vernal pools and other ephemeral aquatic features during November and February on submerged and emergent vegetation. Larvae transform during late spring or early summer, usually by the first week of July. Once a metamorph leaves its natal pond and enters a burrow, it will then spend the vast majority of its life underground in burrows made by other species. Adult CTS engage in mass migrations during a few rainy nights per year, typically from November through April, although migrating adults have been observed as early as October and as late as May. During these rain events, adults leave their underground burrows and return to breeding ponds to mate and will then return to their underground burrows. Several studies have shown that CTS can migrate up to 2 miles between breeding ponds and upland habitat.

There are nine CNDDB occurrences of CTS within 5 miles of the project site with the most recent record from 2014. The closest record is approximately 2.75 miles south of the project site from 2014 located at the Laguna Sewer District Wastewater Reclamation Plant at a known breeding pond. The other records occur around the Santa Maria Airport between 3 and 4 miles south of the project site.

While there are no known breeding ponds within 2 miles of the project site, there is the potential CTS could use the WWTP for aquatic habitat as adult CTS have been documented to use sewage treatment plants to breed (USFWS 2016). Additionally, Botta’s pocket gopher (Thomomys bottae) and California ground squirrel (Otospermophilus beecheyi) burrows were observed within the WWTP. The potential for CTS to occur within the project site, specifically the WWTP, is low due to the project site being outside of the dispersal range for CTS, regular disturbance, and the agricultural field would impede CTS migration. The irrigation ditches do not hold water long enough for CTS to breed and are routinely maintained, limiting suitable upland habitat. Other portions of the project site support agricultural row crops and do not contain aquatic or upland habitat to support CTS.

Nonetheless, occurrence cannot be ruled out and the project site, specifically the WWTP, could support breeding and upland habitat for CTS.

California Red-legged Frog. California red-legged frog (CRLF) is listed as a threatened species under FESA and is CDFW Species of Special Concern. This amphibian has declined in, or disappeared from, large portions of its former range in California (Stebbins 2003) but is still relatively common along the central coast of California, including portions of northern Santa Barbara County (USFWS 2002).

CRLF occurs in aquatic habitats such as creeks, ponds, and marshes. Suitable breeding habitat usually includes a minimum water depth of 10 to 20 inches and must contain water during the entire development period for eggs and tadpoles. Summer habitat may include upland areas and small mammal burrows close to a pond or a deep pool in a creek with emergent vegetation, undercut banks, or semi-submerged rootballs (USFWS 2005). CRLF enter a dormant state during summer or dry weather (estivate) in small mammal burrows and moist leaf litter. They have been found estivating up to 100 feet from water in adjacent dense riparian vegetation (USFWS 2017).

CRLF will disperse from their breeding habitat to forage and seek suitable upland and riparian habitat if aquatic habitat is not available (USFWS 2010). In one study referenced by the USFWS in the Final Rule for Designation of Critical Habitat for the California Red-Legged Frog, the majority of CRLF dispersed less than 1,640 feet away from breeding habitat, and the maximum dispersal 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 9 distance recorded was 1.7 miles (Fellers and Kleeman 2007, pp. 279–280). The study concluded that most CRLF move away from breeding sites, but only a few disperse farther than the nearest non-breeding habitat and that the distance moved is highly dependent on site conditions and local landscapes (Fellers and Kleeman 2007, p. 284). Movements of greater than 98 feet occurred mostly during winter rain events (Fellers and Kleeman 2007, p. 279). Other studies also suggest that CRLF dispersal distances from suitable breeding habitat are greatest during or following rain events.

During wet weather, CRLF often occurs in upland habitats near aquatic sites and can disperse widely over upland habitats during wet weather. For example, in Santa Cruz County, CRLF were documented to move through upland habitats for distances of over 2 miles, and these movements appear to be without regard to topographic features, vegetation communities, or riparian corridors (USFWS 2002).

There are 28 CNDDB occurrences of CRLF within 5 miles of the project site with most recent record from 2007. The closest record is located 0.24 mile northwest of the WWTP, and several other records are located between 0.4 and 1 mile from the project site within agricultural ponds. There are several agricultural ponds within the project site vicinity, and there are four agricultural ponds and an irrigated pasture located immediately east of the project site.

The WWTP ponds within the project site could provide marginal aquatic breeding, non-breeding, and dispersal habitat for CRLF. Small mammal burrows, those of Botta’s pocket gopher and California ground squirrel, were also observed within the portions of the WWTP that could potentially provide suitable upland sheltering habitat for CRLF.

At the time of the survey, the irrigation ditches did not contain water; however, there is potential for CRLF to use these ditches for dispersal and non-breeding aquatic habitat. These features lack the depth and hydroperiod required for breeding. The regular disturbance also reduces suitability within the irrigation ditches, but occurrence cannot be ruled out. Additionally, unknown small mammal burrows were observed along the margins of the eastern side of the project site adjacent to the agricultural ponds located outside of the project site boundary. This area could also provide upland sheltering habitat for CRLF. Due to the presence of suitable aquatic habitat and potentially suitable aquatic breeding habitats within the project vicinity, CRLF has a probability of occurring within the project site.

Western spadefoot. Western spadefoot is proposed for federal listing as threatened and listed as a CDFW Species of Special Concern. Western spadefoot ranges throughout the Central Valley and adjacent foothills. Western spadefoot inhabit areas ranging from near sea level to about 4,460 feet above mean sea level. This species occurs primarily in grasslands, but occasional populations also occur in valley-foothill hardwood woodlands. Some populations persist for a few years in orchard or vineyard habitats. Its prey base is comprised of insects, worms, algae, and other invertebrates.

Western spadefoots spend most of the year in underground burrows that either they construct themselves or are constructed by other mammal species. For breeding, the species uses temporary rain pools (vernal pools) that persist for more than three weeks. Tadpoles transform during late spring and disperse after spending a few hours or days near the pond margins.

There are 17 CNDDB occurrences of western spadefoot within 5 miles of the project site with the most recent record from 2010. There is one historic CNDDB occurrence of western spadefoot from 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 10 1923 that overlaps the project site, but the breeding habitat that the record refers to likely no longer exists. The closest record is approximately 2.3 miles north of the WWTP from 2007.

The WWTP may provide some breeding and upland dispersal habitat. The regular disturbance also reduces suitability within WWTP, but occurrence cannot be ruled out. The irrigation ditches could provide marginal breeding and dispersal habitat as western spadefoot have been documented to use irrigation ditches for breeding (Stebbins 2003). The upland habitat is highly disturbed from agriculture practices and reduces suitability, but occurrence cannot be ruled out. Overall, there is some potential for western spadefoot to use the irrigation ditches for breeding and/or dispersal.

Southwestern pond turtle. Southwestern pond turtle (SWPT) is proposed for federal listing as threatened and is listed as a CDFW Species of Special of Concern. SWPT is generalized in its habitat requirements, occurring in a broad range of aquatic water bodies including flowing rivers and streams, permanent lakes, ponds, reservoirs, settling ponds, marshes, and other wetlands. This species will also temporarily use semipermanent or ephemeral waterbodies, including stock ponds, vernal pools, and seasonal wetlands (Stebbins 2003, Germano and Bury 2009). This species is primarily aquatic; however, they typically leave aquatic habitats in the fall to reproduce and to overwinter (Jennings and Hayes 1994). Deep, still water with abundant emergent woody debris, overhanging vegetation, and rock outcrops is optimal for basking and thermoregulation. Although adults are habitat generalists, hatchlings and juveniles require shallow edgewater with relatively dense submergent or short emergent vegetation in which to forage. Eggs are deposited within excavated nests in upland areas, with substrates that typically have high clay or silt fractions (Jennings and Hayes 1994). When suitable nesting conditions are present, pond turtles typically lay approximately three to 11 eggs between March and August. The majority of nesting sites are located within 650 feet (200 meters) of aquatic sites; however, nests have been documented as far as 1,640 feet (500 meters) from aquatic habitat. Localized soil conditions and the frequency and degree of disturbance in the upland habitat limit their distribution. Soils need to be loose enough to allow nest excavation, while disturbance needs to be infrequent enough or of sufficiently low intensity that nests are not disturbed (Ernst and Lovich 2009). Furthermore, a study in the State of Washington found that urban, residential, and agricultural development of upland habitats within 325 feet (100 meters) of waterbodies effectively eliminated historical nesting areas (Holland and Bury 2004).

There is one CNDDB occurrence of SWPT located approximately 1.40 miles south of the project site from 1995. SWPTs are known to inhabit and thrive in sewage treatment facilities (Bury et al. 2012) and feed on human food waste (Germano and Riedle 2015, Germano 2016, Germano 2010).

Furthermore, a study conducted in the San Joaquin Valley documented 319 pond turtles breeding at two sewage-treatment facilities (Germano 2010). The WWTP ponds contain suitable breeding and upland habitat for SWPT. It is unlikely the irrigation ditches support SWPT due to the regular disturbance and lack of undisturbed upland habitat and aquatic habitat.

State Listed Species
Tricolored blackbird. Tricolored blackbird is State listed as threatened and colonial nesting sites are protected. This species is a resident of California and is found predominantly in the Central Valley and in coastal areas south of Sonoma County. Tricolored blackbirds primarily eat insects, seeds and cultivated grains in croplands, grassy fields, flooded land, and along edges of ponds. Tricolored 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 11 blackbird nests in dense cattails (Typha spp.) or tules (Schoenoplectus spp.), willows (Salix spp.), blackberry (Rubus spp.), wild rose (Rosa spp.), or tall herbs. Nests are located a few feet over or near fresh water. Breeding season occurs between mid-April through late July with a clutch size of three to four eggs. Tricolored blackbirds may raise two broods per year.

There are no CNDDB occurrences of tricolored blackbird in the project site or the vicinity. However, several eBird records have documented tricolored blackbird within the WWTP as recently as 2022 and as far back as 1991. Emergent vegetation is present along the perimeter of the some of the ponds within the WWTP and could provide suitable nesting and foraging habitat. The remainder of the project site does not contain suitable nesting habitat. However, the species may forage in and around these areas.

Non-Listed Special-Status Species
The following special-status species are not listed under the FESA or CESA, but have special-status designations, and impacts to these species warrant consideration under CEQA:

Northern California legless lizard. Northern California legless lizard is a CDFW Species of Special Concern. The range of this species is through the Coast Ranges in the vicinity of Antioch, Contra Costa County, south to the Mexican border. Northern California legless lizard usually forages at the base of shrubs or other vegetation either on the surface or just below it in leaf litter or sandy soil.

This species will also seek cover under surface objects such as flat boards and rocks where they lie barely covered in loose soil. They are often encountered buried in leaf litter and commonly burrow near the surface through loose soil. The reproductive season begins with mating activities in late spring or early summer. Live young are born in September, October, or even November. Legless lizard population densities have been reported associated with certain plant species that provide leaf litter and strong root structures attracting preferred prey and offering cover (Gallegos 2019).

Invasive ice plants (Carpobrotus edulis and Mesembryanthemum crystallinum) reduce soil moisture and the number of insects that inhabit the sand. They have no leaf litter and poor root structure, making the sand unsuitable for many herps, while outcompeting native plants that provide good microhabitats (Kuhnz et al. 2005, Jennings and Hayes 1994).

There are 15 CNDDB occurrences of northern California legless lizard within 5 miles of the project site with the most recent record from 2016. The closest record is approximately 0.27 mile south of the project site from 2010, and the remaining records are between 1.63 and 4 miles from the project site. CNDDB records of this species are associated with grassland habitats that contain native plants and sandy soils. The project site lacks native plants, contains ice plants, and has been heavily compacted due to agricultural practices and maintenance activities associated with WWTP. The site conditions reduce the suitability for northern California legless lizard. However, its presence cannot be completely ruled out.

Coast horned lizard. Coast horned lizard is a CDFW Species of Special Concern. It occurs in valley foothill hardwood, conifer and riparian habitats, as well as in pine-cypress, juniper, and annual grassland habitats. Its range extends through the Sierra Nevada foothills from Butte County to Kern County and throughout the central and southern California coast. Its elevational range extends up to 4,000 feet in the Sierra Nevada foothills and up to 6,000 feet in the mountains of southern 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 12 California. However, it is mainly found below 2,000 feet in the north and below 3,000 feet in the south. Coast horned lizards primarily eat ants and other insects like wasps, grasshoppers, and flies.

There are three CNDDB occurrences of coast horned lizard within 5 miles of the project site from 2008 and 2015. The closet record is approximately 3.98 miles northeast of the project site from 2008. The other two records are 4.5 miles east of the project site. Similar to the northern California legless lizard, the soils within the project site have been heavily compacted due to agricultural practices and maintenance activities associated with WWTP and lack native habitat, making it unlikely for this species to occur within the project site. However, its presence cannot be completely ruled out.

Western Burrowing Owl. Western burrowing owl is a CDFW Species of Special Concern. It is found in open, dry grasslands, agricultural and range lands, and desert habitats often associated with burrowing animals. Western burrowing owls nest in old ground squirrel, badger, or kit fox dens (i.e., burrows that are excavated by other species). These owls can be found at elevations ranging from 200 feet below sea level to 9,000 feet above mean sea level. Prey is primarily large arthropods as well as small mammals such as mice, rats, and gophers. The owls tend to perch on fence posts or on top of mounds outside their burrows. Western burrowing owls can migrate seasonally; the nesting season is typically between March and April. Burrowing owls have recently been documented within 5 miles of the project site.

There are two CNNDB occurrences of western burrowing owl within 5 miles of the project site from 2003 and 2009 located approximately 0.18 mile and 0.89 mile south of the project site, respectively.

Additionally, one eBird record has documented burrowing owl within the WWTP in 2010, and several other eBird records have been recorded in close proximity to project site. However, no sign that would indicate occupation or use by this species (e.g., scat, tracks, whitewash, prey remains, or any other sign) was identified during the field survey. Several small mammal burrows, including active California ground squirrel burrows, were observed within the WWTP. None of the small mammal burrows observed exhibited features typical of occupied burrowing owl burrows (e.g., whitewash and/or prey remains), although the species is highly mobile and there is some potential for future use of the project site by western burrowing owl. Western burrowing owl also may forage in and around the agricultural areas of the project site; however, the agricultural areas lack burrows and nesting habitat.

Yellow warbler. Yellow warbler is a CDFW Species of Special Concern. This species is found in riparian deciduous habitats such as cottonwoods, willows, alders, and other small trees and shrubs typical of low, open-canopy riparian woodland. It usually arrives in California in April and is mostly gone by October.

There are no CNDDB occurrences of yellow warbler within 5 miles of the project site. However, there are several eBird records documenting yellow warbler within the WWTP from 2020 and there are other records in the project vicinity. Emergent vegetation is present along the perimeter of some of the ponds within the WWTP and could provide suitable nesting and foraging habitat. The remainder of the project site does not contain suitable nesting habitat; however, the species may forage and in around the project site.
7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 13 Other Nesting Birds. Nesting birds are protected under the California Fish and Game Code and most native/migratory species are covered under the federal Migratory Bird Treaty Act. Construction activities that occur during the nesting bird season (typically February 1 through September 30) have the potential to result in the direct or indirect take of nesting birds. Several active nests were observed in the WWTP during the May 2024 survey and include barn swallow (Hirundo rustica), house finch (Haemorhous mexicanus), and American avocet (Recurvirostra americana).

Critical Habitat
The project site is not located within or adjacent to designated or proposed critical habitat for any species.

Aquatic Resources
There are several ponds associated with the WWTP as well as irrigation ditches within the project site as shown on Figure 3.

The WWTP ponds are artificially constructed and are regularly maintained and treated for wastewater management purposes. A majority of the ponds contained surface water at the time of the survey and do not contain any connection to other aquatic features. Under the current regulatory definition of Waters of the United States (WOTUS) and implementation guidance, the United States Army Corps of Engineers (USACE) does not assert Clean Water Act Section 404 jurisdiction over active wastewater treatment facilities, or features that lack a significant nexus with traditional navigable waters. In addition, the State Wetland Definition and Procedures for Discharge of Dredged or Fill Material of Waters of the State (State Water Resources Control Board [SWRCB] 2019) states that industrial or municipal wastewater treatment or disposal features are not considered jurisdictional waters of the State. Isolated wastewater treatment ponds are also not considered “streams, lakes, or rivers” subject to regulation under Section 1602 of the California Fish and Game Code. As such, the active wastewater treatment ponds within the WWTP are not considered to be jurisdictional aquatic resources under the aforementioned regulations.

Several of the irrigation ditches are located along the roadsides of both Stowell Road and Black Road, and one is located within the WWTP. These ditches carry stormwater and agricultural runoff within the project site and adjacent agricultural properties. Based on analysis of aerial imagery, the ditches do not have any connection to other aquatic features. Most of the ditches were either barren with a sandy bottom or contained ruderal vegetation lining the bottom/banks. Commonly observed species include short pod mustard, lamb’s quarter, Canadian horseweed, and other annual grasses. Ditches (including roadside ditches) excavated wholly in uplands and draining only uplands are not typically considered WOTUS by the USACE. The existing drainage ditches do not have a defined bed and bank, are regularly disturbed by agricultural practices, and provide little to no habitat value to wildlife. These ditches would not be considered jurisdictional by the CDFW as they are isolated features; do not likely meet the California Fish and Game Code definitions of a “stream,” “river,” or “lake;” and lack a defined bed/bank. However, the irrigation ditches could potentially be subject to the jurisdiction of the Regional Water Quality Control Board (RWQCB) as waters of the State under the Porter-Cologne Water Quality Control Act (Porter-Cologne Act) because these features convey ephemeral surface flows. Potential RWQCB jurisdiction under the Porter-Cologne 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 14 Act is broad, including “any surface water or groundwater, including saline waters, within the boundaries of the state” (Water Code section 13050(e)).

Wildlife Movement and Habitat Connectivity
Movement corridors may provide favorable locations for wildlife to travel between different habitat areas such as foraging sites, breeding sites, cover areas, and preferred summer and winter range locations. They may also function as dispersal corridors allowing animals to move between various locations within their range.

The project site is primarily developed and subjected to longstanding anthropogenic disturbances that would limit wildlife movement within the project site. Additionally, the project site is surrounded by converted lands used for residential uses, roads, recreation, and commercial uses and the project site has no connection to natural habitats, further limiting wildlife movement through the project site. However, migratory bird species may utilize the project site for transient migration or foraging and would be limited to species that forage over developed areas. The project site does not possess any characteristics that would indicate a locally significant stopover point for migratory species including raptors or waterfowl. However, several common and special-status species are known to move throughout lands in the general vicinity.

Regional Habitat Conservation Plans and Local Policies
The City of Santa Maria and the County of Santa Barbara currently do not have an adopted regional Natural Community Conservation Plan or Habitat Conservation Plan. The 2010 General Plan for the City of Santa Maria outlines local relevant policies related to biological resources applicable to the project.

CITY OF SANTA MARIA GENERAL PLAN
POLICY 3. Protect and preserve biological resources and expand the urban forest within the Planning Area in order to enhance the quality of life in the Santa Maria Valley.

Furthermore, no protected trees are located within the project site (City of Santa Maria 2016).

CONCLUSION
The proposed project does not have a site plan depicting ground disturbance activities within the project site. At this time, the impact analysis and recommended mitigation measures will be completed once a site plan is finalized and would then be used to support the CEQA review process.

Based on field observations coupled with the habitat suitability analysis conducted for this memorandum, the project site has potential to support nine special-status animal species and nesting birds within the project site due to the presence of suitable habitat. No special-status plants are expected to occur due to the extensive disturbances, developments, and maintenance associated with the WWTP and agricultural practices. Additionally, the project site does not support any sensitive natural communities. Furthermore, the active wastewater treatment ponds within the 7/8/24 (P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx) 15 WWTP are not considered to be jurisdictional aquatic resources under the current regulations. The irrigation ditches would also not be regulated by CDFW and USACE as jurisdictional features because they do not meet the current regulatory definitions. However, the irrigation ditches could potentially be subject to the jurisdiction of the RWQCB as waters of the State under the Porter-Cologne Act because these features convey ephemeral surface flows. The project site does not contain any critical habitat or wildlife movement corridors.

If you have any questions regarding this memorandum, please contact Kelly McDonald at (805) 324-6836.

Attachments: A: References
B: Figures
C: Representative Site Photographs
D: Vascular Plant and Animal Species Observed
E: Summary of Special-Status Species
A-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT A

REFERENCES
Baldwin, B.G., D.H. Goldman, D.J. Keil, R. Patterson, T.J. Rosatti, and D.H. Wilken, editors. 2012. The Jepson Manual: Vascular Plants of California, Second Edition. University of California Press, Berkeley.

Bury, R,B, H.H. Welsh, Jr., D.J. Germano, and D.T. Ashton. 2012. Western pond turtle: Biology, sampling techniques, inventory and monitoring, conservation, and management. Northwest Fauna 7. The Society for Northwestern Vertebrate Biology.

California Department of Fish and Wildlife (CDFW). 2024a. California Natural Diversity Data Base (CNDDB). Special Animals List. January 2024. Periodic publication. 67 pp. ______. 2024b. State of California, Department of Fish and Wildlife Biogeographic Data Branch.

California Natural Diversity Database (CNDDB). Rarefind Version 5. July 2021. Rarefind query of the USGS 7.5-minute quads seven-quad review area – Oceano, Nipomo, Huasna Peak, Guadalupe, Santa Maria, Twitchell Dam, Casmalia, Orcutt, and Sisquoc and GIS query of occurrences within a 5-mile buffer (project vicinity).

California Native Plant Society (CNPS). 2024. Inventory of Rare and Endangered Plants (online edition v8). Website: http://cnps.org/cnps/rareplants/inventory/ (accessed May 2024).

City of Santa Maria. 2011. City of Santa Maria General Plan. Website: https://www.cityofsantamaria. org/citygovernment/ departments/community-development/planning-division/planning-policies-andregulations/ general-plan (accessed May 2024). ______. 2016. Santa Maria Municipal Code. Website: http://www.qcode.us/codes/santamaria/ (accessed May 2024).

Crother, B.I., ed. 2012. Scientific and Standard English Names of Amphibians and Reptiles of North America North of Mexico. Society for the Study of Amphibians and Reptiles (SSAR) Herpetological Circular 39. Website: http://ssarherps.org/wp-content/uploads/2014/07/ HC_39_7thEd.pdf (accessed June 2024).
eBird. 2024. eBird: An online database of bird distribution and abundance. eBird, Cornell Lab of Ornithology, Ithaca, New York. Website: http://www.ebird.org (accessed May 2024).

Ernst, C.H., Lovich, J.E. 2009. Turtles of the United States and Canada. 2nd Edition. Baltimore: Johns Hopkins University Press.

Fellers, G.M. and P.M. Kleeman. 2007. California Red-Legged Frog (Rana draytonii) Movement and Habitat Use: Implications for Conservation. Journal of Herpetology, Vol. 41, No. 2, pp. 276286, 2007.

A-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Gallegos, M.A. 2019. Habitat Preference and Distribution of the Northern California Legless Lizard (Anniella pulchra) in Eastern Contra Costa County. U.C. Berkeley.

Germano, D.J. 2010. Ecology of Western Pond Turtles (Actinemys marmorata) at Sewage Treatment Facilities in the San Joaquin Valley, California. The Southwestern Naturalist 55(1): 89–97. (accessed June 2024).
______. 2016. The Ecology of a Robust Population of Actinemys marmorata in the San Joaquin Desert of California. Copeia 104(3): 663–676. (accessed June 2024).

Germano, D.J., and J.D. Riedle. 2015. Population Structure, Growth, Survivorship, and Reproduction of Actinemys marmorata from a High Elevation Site in the Tehachapi Mountains, California.

Herpetologica 71(2): 102–109.

Germano, D.J., and R.B. Bury. 2009. Variation in body size, growth, and population structure of Actinemys marmorata from lentic and lotic habitats in southern Oregon. Journal of Herpetology 43:510–520.

Google LLC. 2024. Google Earth Pro.

Holland. 1986. California Department of Fish and Game: Preliminary Descriptions of the Terrestrial Natural Communities of California.

Holland, D.C., and R.B. Bury. 2004. Clemmys marmorata (Baird and Girard 1852) western pond turtle. In P.C. H. Pritchard and A. G. J Rhodin (eds.), The conservation biology of freshwater turtles. Chelonian Research Monographs 2(2).

Jennings, M.R., and M.P. Hayes. 1994. Amphibian and reptile species of special concern in California.

Final Report to the California Department of Fish and Game, Inland Fisheries Division, Rancho Cordova, California.

Kuhnz, L.A., R.K. Burton, P.N. Slattery, and J.M. Oakden. 2005. Microhabitats and population densities of California legless lizards, with comments on effectiveness of various techniques for estimating numbers of fossorial reptiles. Journal of Herpetology 39(3):395-402 Natural Resource Conservation Service (NRCS). 2024. Web Soil Survey. Website http://websoil survey.nrcs.usda.gov/app/WebSoilSurvey.aspx (accessed June 2024).

Rincon Consultants, Inc. 2006. Santa Maria Wastewater Treatment Plant Expansion Final Environmental Impact Report.

Sawyer, J., T. Keeler-Wolf, and J. Evans. 2009. A Manual of California Vegetation. 2nd edition.

California Native Plant Society. Sacramento, California: California Native Plant Society. 1,300 pp.

SWCA Environmental Consultants. 2023. Stowell/Black Road Waterline Extension Initial Study Report. April.

A-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) State Water Resources Control Board (SWRCB). 2019. State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State [For Inclusion in the Water Quality Control Plans for Inland Surface Waters and Enclosed Bays and Estuaries and Ocean Waters of California]. Adopted April 2, 2019. Effective May 28, 2020. Website: https://www. waterboards.ca.gov/water_issues/programs/cwa401/docs/2021/procedures.pdf (accessed June 2024).

Stebbins, R.C. 2003. A Field Guide to Western Reptiles and Amphibians. Third Edition. Boston:

Houghton Mifflin Company.

United States Environmental Protection Agency (USEPA) and Department of the Army (DOA). 2020.

The Navigable Waters Protection Rule: Definition of “Waters of the United States.” 85 Federal Register 22250. Website: https://www.federalregister.gov/documents/2020/04/21/ 2020-02500/the-navigable-waters-protection-rule-definition-of-waters-of-the-united-states (accessed June 2024).

United States Fish and Wildlife Service (USFWS). 2002. Recovery Plan for the California Red-legged Frog (Rana aurora draytonii). Portland, Oregon.
______. 2005. USFWS Revised Guidance on Site Assessments and Field Surveys for the California Red-legged Frog. Sacramento, CA.
______. 2010. Revised Designation of Critical Habitat for the California Red-legged Frog Final Rule.

Federal Register 7 (1): 12816-12959.
______. 2015. Draft recovery plan for the Santa Barbara County Distinct Population Segment of the California tiger salamander (Ambystoma californiense). U.S. Fish and Wildlife Service, Pacific Southwest Region, Ventura, California. vi + 76 pp
______. 2015. USFWS Critical Habitat Mapper. Website: http://ecos.fws.gov/crithab/ (accessed June 2023).
______. 2016. Recovery Plan for the Central California Distinct Population Segment of the California Tiger Salamander (Ambystoma californiense). U.S. Fish and Wildlife Service, Pacific Southwest Region, Sacramento, California. v + 69pp.
______. 2017. Species Information. California Red-Legged Frog (Rana draytonii). Sacramento Fish & Wildlife Office. Updated December 20, 2017. Website: https://www.fws.gov/species/ california-red-legged-frog-rana-draytonii (accessed June 2024). ______. 2024a. Environmental Conservation Online System (ECOS). Information for Planning and Conservation (IPaC) Trust Resources Report. Website: http://ecos.fws.gov/ecp/ (accessed June 2024).
______. 2024b. USFWS Critical Habitat Polygons. Website: http://ecos.fws.gov/crithab/ (accessed May 2024).
______. 2024c. USFWS National Wetlands Inventory (NWI), Online Mapper Tool. Website:
https://www.fws.gov/wetlands/data/mapper.html (accessed June 2024).

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT B

FIGURES
Figure 1: Regional Location Map
Figure 2: Project Site
Figure 3: Vegetation
Figure 4: Soils
SOURCE: USGS The National Map (2018)
I:\20241463\GIS\Pro\Santa Maria WWTP Project\Santa Maria WWTP Project.aprx (4/30/2024) FIGURE 1
Santa Maria Wastewater Treatment
Plant Improvements Project

S A N L U I S

O B I S P O

C O U N T Y

S A N T A

B A R B A R A

C O U N T Y
£¤101
Ã1
Ã227
Ã135 Ã166
Project Vicinity
0 1000 2000
FEET
Project Location
Regional Location Map
Black Rd
Ray Rd
W Stowell Rd
Main St
E St
Prandini Way
Unnam
e
d Farm Rd
Bonita School Rd
SOURCE: Nearmap (6/2023)
I:\20241463\GIS\Pro\Santa Maria WWTP Project\Santa Maria WWTP Project.aprx (4/30/2024) FIGURE 2
Santa Maria Wastewater Treatment
Plant Improvements Project 0 750 1500
FEET
Project Site
Project Site

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT C

REPRESENTATIVE SITE PHOTOS
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Attachment C
Representative Site Photos
Santa Maria Wastewater Treatment Project

1. View of the developed area facing northwest. May 9, 2024. 2. View of the disturbed/ruderal area facing east. May 9, 2024.

3. View of agricultural- row crop area facing southwest. May 9, 2024.

4. View of irrigation ditch facing east. May 9, 2024.

Page 1 of 4 ends
← All documents from this meeting