I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

5. View of irrigation ditch facing east. May 9, 2024. 6. View of irrigation ditch facing east. May 9, 2024.

7. View of agricultural- row crop area facing west. May 9, 2024.

8. View of irrigation ditch facing west. May 9, 2024.

Page 2 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

9. View of irrigation facing north. May 9, 2024. 10. View of developed area within WWTP, facing northeast.

May 9, 2024.

11. View of ponds within WWTP facing west. May 9, 2024. 12. View of active barn swallow nest on WWTP structures.

May 9, 2024.

Page 3 of 4 ends

Attachment C
I:\20241463\G\Photos_Bio.cdr 6 7 24( / /20 )
Representative Site Photos
Santa Maria Wastewater Treatment Project

13. View of developed area within WWTP facing north. May 9, 2024.

14. View of active California ground squirrel burrow. May 9, 2024.

Page 4 of 4 ends

Attachment C
D-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT D

VASCULAR PLANT AND ANIMAL SPECIES OBSERVED
The following plant species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Vascular Plant Species Observed

EUDICOTS
Apiaceae Carrot Family
* Conium maculatum Poison hemlock
Amaranthaceae Amaranth Family
* Chenopodium album Lamb’s quarter
* Chenopodiastrum murale Nettle-leaved goosefoot
Asteraceae Sunflower Family
Baccharis pilularis Coyote bush
* Carduus pycnocephalus Italian thistle
Erigeron canadensis Common horseweed
* Helminthotheca echioides Bristly oxtongue
Heterotheca grandiflora Telegraphweed
Matricaria discoidea Pineapple weed
* Senecio vulgaris Common groundsel
* Sonchus arvensis Sow thistle
Aizoaceae Iceplant Family
* Carpobrotus edulis Iceplant
Boraginaceae Borage Family
Amsinckia intermedia Common fiddleneck
Brassicaceae Mustard Family
* Brassica nigra Black mustard
* Capsella bursa-pastoris Shepherd’s purse
* Coronopus didymus Lesser swine-cress
* Hirschfeldia incana Short pod mustard
* Raphanus raphanistrum Wild radish
* Sisymbrium irio London rocket
Caryophyllaceae Pink Family
* Stellaria media Common chickweed
Fabaceae Legume Family
* Medicago polymorpha Burr clover
* Melilotus indicus Yellow sweetclover
* Trifolium hirtum Rose clover
Fagaceae Oak Family
Quercus agrifolia Coast live oak
D-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Vascular Plant Species Observed
Frankeniaceae Frankenia Family
Frankenia salina Alkali heath
Geraniaceae Geranium Family
* Erodium botrys Big heron bill
Malvaceae Mallow Family
* Malva parviflora Cheesweed mallow
Myrsinaceae Myrsine Family
* Lysimachia arvensis Scarlet pimpernel
Onagraceae Evening Primrose Family
Camissonia strigulosa Sandysoil suncup
Enothera biennis Common evening primrose
Papaveraceae Poppy Family
Eschscholzia californica California poppy
Plantaginaceae Plantain Family
* Plantago lanceolata English plantain
Polygonaceae Buckwheat Family
* Rumex crispus Curly dock
Salicaceae Willow Family
Salix laevigata Red willow
Salix exigua Narrowleaf willow
Solanaceae Nightshade Family
* Nicotiana glauca Tree tobacco
Urticaceae Nettle Family
* Urtica urens Dwarf nettle

MONOCOTS
Cyperaceae Sedge Family
Schoenoplectus californicus California bulrush
Poaceae Grass Family
* Avena fauta Wild oats
Bromus madritensis Red brome
* Cynodon dactylon Bermuda grass
* Bromus diandrus Ripgut brome
* Ehrharta calycina Perennial veldt grass
* Hordeum murinum Mouse barley
* Festuca myuros Rattail sixweeks grass
* Festuca perennis Italian rye grass
* Lamarckia aurea Goldentop grass
* Polypogon monspeliensis Rabbitsfoot grass
* Schismus arabicus Mediterranean grass
Sorghum halepense Johnson grass
* Triticum aestivum Common wheat
D-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) The following animal species were observed in the specified survey area by LSA biologist Kelly McDonald during the survey conducted on May 9, 2024.
* introduced species not native to California
Animal Species Observed

REPTILIA REPTILES
Phrynosomatidae Phrynosomatid Lizards
Sceloporus occidentalis Western fence lizard
Colubridae Colubrid Snakes
Pituophis catenifer Gophersnake

AVES BIRDS
Anatidae Ducks, Geese, and Swans
Anas platyrhynchos Mallard
Oxyura jamaicensis Ruddy duck
Rallidae Rails, Gallinules, and Coots
Fulica americana American coot
Recurvirostridae Stilts and Avocets
Himantopus mexicanus Black-necked stilt
Recurvirostra americana American avocet
Charadriidae Plovers and Lapwings
Charadrius vociferus Killdeer
Scolopacidae Sandpipers
Tringa flavipes Lesser yellowlegs
Columbidae Pigeons and Doves
Zenaida macroura Mourning dove
Trochilidae Hummingbirds
Calypte anna Anna’s hummingbird
Tyrannidae Tyrant Flycatchers
Sayornis nigricans Black phoebe
Cathartidae New World Vultures
Cathartes aura Turkey vulture
Accipitridae Hawks, Kites, Eagles, and Allies
Buteo jamaicensis Red-tailed hawk
Falconidae Caracaras and Falcons
Falco sparverius American kestrel
Corvidae Crows and Jays
Corvus brachyrhynchos American crow
Alaudidae Larks
Eremophila alpestris Horned lark
Hirundinidae Swallows
Hirundo rustica Barn swallow
Petrochelidon pyrrhonota Cliff swallow
D-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Animal Species Observed
Mimidae Mockingbirds and Thrashers
Mimus polyglottos Northern mockingbird
Sturnidae Starlings
* Sturnus vulgaris European starling
Passeridae Old World Sparrows
* Passer domesticus House sparrow
Fringillidae Fringilline and Cardueline Finches and Allies Haemorhous mexicanus House finch
Passerellidae New World Sparrows
Melospiza melodia Song sparrow
Icteridae Blackbirds
Agelaius phoeniceus Red-winged blackbird
Euphagus cyanocephalus Brewer’s blackbird
Quiscalus mexicanus Great-tailed grackle
Parulidae Wood Warblers
Leiothlypis celata Orange-crowned warbler
Geothlypis trichas Common yellowthroat

MAMMALIA MAMMALS
Geomyidae Pocket Gophers
Thomomys bottae Botta’s pocket gopher
Sciuridae Squirrels, Chipmunks, and Marmots
Otospermophilus beecheyi California ground squirrel

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24)

ATTACHMENT E

SUMMARY OF SPECIAL-STATUS SPECIES
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Hoover’s
bentgrass
Agrostis hooveri US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in mostly sandy
soil within chaparral, closed-cone coniferous
forest, cismontane woodland and
valley/foothill grassland between 6 and 610
m in elevation. Found in San Luis Obispo and
Santa Barbara counties.

April–July Not expected. There is one known record of
occurrence in the project vicinity 1 (CNDDB
2013). The project site does not contain
chaparral, closed-cone coniferous forest,
cismontane woodland and valley/foothill
grassland habitats.

Aphanisma Aphanisma blitoides US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal dunes and coastal scrub in
sometimes gravelly and sandy soils between
1 and 305 m in elevation. Found in Los
Angeles, Orange, San Diego, Santa Barbara
and Ventura counties.

February–June Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent.

Santa
Margarita
manzanita
Arctostaphylos
pilosula
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
Broadleafed upland forest, Chaparral,
Cismontane woodland, and Closed-cone
coniferous forest between 75 and 1,100 m
in elevation. San Luis Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, coastal dunes and coastal scrub are
absent. This perennial species was not
observed within the project site.

La Purisima
manzanita
Arctostaphylos
purissima
US: –
CA: –
CNPS: 1B.1
Perennial evergreen shrub found in coastal
scrub and sandy chaparral between 60 and
390 m in elevation. Santa Barbara County.

November–May Not expected. There are no known records of occurrence in project vicinity and coastal
scrub and sandy chaparral are absent. This
perennial species was not observed within
the project site.

Refugio
manzanita
Arctostaphylos
refugioensis
US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub found in
chaparral (sandstone) between 274 and 820
m in elevation. Santa Barbara County.
(May)December–
March
Not expected. There are no known records of
occurrence in project vicinity and chaparral
(sandstone) is absent. This perennial species
was not observed within the project site.

Sand mesa
manzanita
Arctostaphylos rudis US: –
CA: –
CNPS: 1B.2
Perennial evergreen shrub occurring in
maritime, sandy chaparral between 25 and
322 m. Santa Barbara County.

November–
February
Not expected. There are no known records of
occurrence in project vicinity and maritime,
sandy chaparral is absent. This perennial
species was not observed within the project
site.

Marsh
sandword
Arenaria paludicola US: FE
CA: CE
CNPS: 1B.1
Perennial stoloniferous herb occurring in
marshes and swamps (brackish freshwater)
between 3 and 170 m in elevation. Found in
Los Angeles, Marin, Riverside and San Luis
Obispo counties.

May–August Not expected. There are no known records of
occurrence in project vicinity and marshes
and swamps (brackish freshwater) habitat is
absent.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Mile’s milk-vetchAstragalus
didymocarpus var.
milesianus
US: –
CA: –
CNPS: 1B.2
Annual herb found in coastal scrub on clay
soils between 20 and 90 m in elevation.

Found in San Luis Obispo, Santa Barbara and
Ventura County.

March–June Not expected. There are no known records of
occurrence in project vicinity and coastal
scrub habitat is absent.

San Luis Obispo
owl's-clover
Castilleja densiflora
var. obispoensis
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in meadows/seeps
and valley/foothill grassland between 10
and 430 m in elevation. San Luis Obispo
County.

March-May Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Santa Barbara
ceanothus
Ceanothus
impressus
var. impressus
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 40 and 470 m in
elevation. Santa Barbara County.

February- April Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Nipomo Mesa
ceanothus
Ceanothus
impressus var.
nipomensis
US: –
CA: –
CNPS: 1B.2
Perennial shrub occurring in chaparral,
sandy soils between 30 and 245 m in
elevation. Santa Barbara and San Luis
Obispo counties.

February- April Not expected. There is one known record of occurrence in the project vicinity (CNDDB
1974) and chaparral habitat is absent.

Coastal
goosefoot
Chenopodium
littoreum
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 10 and 30 m in elevation. Found in
Los Angeles, San Luis Obispo and Santa
Barbara counties.

April-August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Bolander's
water-hemlock
Cicuta maculata
var. bolanderi
US: –
CA: –
CNPS: 2B.2
Perennial herb occurring in marshes and
swamps (brackish, coastal, freshwater)
between 0 and 200 m in elevation. Found in
Contra Costa, Marin, Sacramento, Santa
Barbara and Solano counties.

July-September Not expected. There are no known records of occurrence in project vicinity and marsh
habitat is absent.

Surf thistle Cirsium
rhothophilum
US: –
CA: CT
CNPS: 1B.2
Perennial herb occurring in coastal bluff
scrub and coastal dunes between 3 and 60
m in elevation. Santa Barbara and San Luis
Obispo counties.

April-June Not expected. There are no known records of
occurrence in project vicinity and coastal bluff
scrub and coastal dunes habitat is absent.

La Graciosa
thistle
Cirsium scariosum
var.
loncholepis
US: FE
CA: CT
CNPS: 1B.1
Perennial herb occurring in mesic, sandy
cismontane woodland, coastal dunes,
coastal scrub, marshes, swamps (brackish),
and valley/foothill grassland between 4 and
220 m in elevation. Santa Barbara and San
Luis Obispo counties.

May–August Not expected. There are three known records
of occurrence in the project vicinity (CNDDB
1983, 1990, 1991) and cismontane woodland,
coastal dunes, coastal scrub, marshes,
swamps (brackish), and valley/foothill
grassland habitats are absent.

E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
California saw-grassCladium
californicum
US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
meadows, seeps, marshes and swamps
(alkaline, freshwater) between 60 and 1,600
m in elevation. Found in Southern California
counties.

June–September Not expected. There are no known records of occurrence in project vicinity and meadows,
seeps, marshes and swamps habitat is absent.

Pismo clarkia Clarkia speciosa ssp.
immaculata
US: FE
CA: CR
CNPS: 1B.1
Annual herb occurring in chaparral (margins,
openings), cismontane woodland, and
valley/foothill grassland between 25 and
185 in elevation. San Luis Obispo County.

May-July Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

Seaside bird's-beakCordylanthus
rigidus
ssp.
littoralis
US: –
CA: CE
CNPS: 1B.1
Annual herb (hemiparasitic) occurring in
closed-cone coniferous forest, maritime
chaparral, cismontane woodland, coastal
dunes, and coastal scrub between 0 and 515
m in elevation. Monterey and Santa Barbara
County.

April–October Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral,
cismontane woodland, coastal dunes, and
coastal scrub habitat is absent.

Gaviota
tarplant
Deinandra
increscens
ssp.
villosa
US: FE
CA: CE
CNPS: 1B.2
Annual herb occurring in coastal bluff scrub,
coastal scrub and valley/foothill grassland
between 20 and 430 m in elevation. Santa
Barbara County.

May–October Not expected. There are no known records of occurrence in project vicinity and suitable
habitat is absent.

Dune larkspur Delphinium parryi
ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring maritime chaparral
and coastal dunes between 0 and 200 m in
elevation. Found in Santa Barbara, San Luis
Obispo and Ventura counties.

April–June Not expected. There is one historical record of occurrence in the project vicinity (CNDDB
1943) and maritime chaparral and coastal
dunes habitat is absent.

Beach
spectaclepod
Dithyrea maritima US: –
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrubs (sandy)
between 3 and 50 m in elevation. Found in
San Luis Obispo, Santa Barbara and Ventura
counties.

March–May Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrubs habitat is absent.

Blochman’s
dudleya
Dudleya
blochmaniae ssp.
blochmaniae
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in coastal bluff
scrub, chaparral, coastal scrub and
valley/foothill grassland in often clay, rocky
and serpentinite soil between 5 and 450 m
in elevation. Found in Santa Barbara, San
Luis Obispo, Ventura, Orange, Los Angeles,
and San Diego counties.

April–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent. The project site does not
contain suitable soil types for this species.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Blochman's
leafy daisy
Erigeron
blochmaniae
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 3
and 45 m in elevation. Found in San Luis
Obispo and Santa Barbara counties.

June–August Not expected. There is one known record of
occurrence in project vicinity (CNDDB 1991)
and coastal dunes and coastal scrub habitat is
absent.

Lompoc yerba
santa
Eriodictyon
capitatum
US: FE
CA: CR
CNPS: 1B.2
Perennial evergreen shrub occurring in
coastal bluff scrub, closed-cone coniferous
forest, and maritime chaparral between 40
and 900 m in elevation. Santa Barbara
County.

May–September Not expected. There are no known records of occurrence in project vicinity and coastal bluff
scrub, closed-cone coniferous forest, and
maritime chaparral habitat is absent.

Mesa horkelia Horkelia cuneata
var. puberula
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in chaparral,
cismontane woodland, and coastal scrub on
sandy or gravelly soils between 70 and 810
m in elevation. Found in Central Coast and
Southern California counties.

February–July Not expected. There are no known records of occurrence in project vicinity and chaparral,
cismontane woodland, and coastal scrub
habitat is absent.

Kellogg's
horkelia
Horkelia cuneata
var. sericea
US: –
CA: –
CNPS: 1B.1
Perennial herb occurring in closed-cone
coniferous forest, maritime chaparral,
coastal dunes, and coastal scrub between
10 and 200 m in elevation. Found in Central
Coast and Bay Area counties.

April–September Not expected. There are no known records of occurrence in project vicinity and closed-cone
coniferous forest, maritime chaparral, coastal
dunes, and coastal scrub habitat is absent.

Beach layia Layia carnosa US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes and
coastal scrub (sandy) between 0 and 60 m in
elevation. Found in Santa Barbara, San
Francisco, Monterey, Marin, and Humboldt
counties.

March–July Not expected. There are no known records of
occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

Blushing layia Layia erubescens US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes and
coastal scrub between 10 and 245 m in
elevation. Santa Barbara and San Luis
Obispo County.

March-May Not expected. There is one historical record
of occurrence in project vicinity (CNDDB
1937) and coastal dunes and coastal scrub
habitat is absent.

Pale-yellow
layia
Layia heterotricha US: –
CA: –
CNPS: 1B.1
Annual herb occurring in cismontane
woodland, coastal scrub, pinyon/juniper
woodland, and valley/foothill grassland
between 300 and 1,705 m in elevation.

Found in Fresno, Monterey, San Benito,
Santa Barbara and Ventura counties.

March–June Not expected. There are no known records of
occurrence in project vicinity and suitable
habitat is absent.

San Luis Obispo
County lupine
Lupinus
ludovicianus
US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chapparal and
cismontane woodland between 50 and 525
m in elevation. San Luis Obispo County.

April-July Not expected. There are no known records of
occurrence in project vicinity and chapparal
and cismontane woodland habitat is absent.

E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Nipomo Mesa
lupine
Lupinus nipomensis US: FE
CA: CE
CNPS: 1B.1
Annual herb occurring in coastal dunes
between 10 and 50 m in elevation. San Luis
Obispo County.

December-May Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

Slender
bushmallow
Malacothamnus
jonesii var. gracilis
US: –
CA: –
CNPS: 1B.1
Perennial deciduous shrub occurring in
chaparral between 190 and 575 m in
elevation. San Luis Obispo and Santa
Barbara County.

May-October Not expected. There are no known records of occurrence in project vicinity and chaparral
habitat is absent.

Southern curly-leaved
monardella
Monardella sinuata
ssp.
sinuata
US: –
CA: –
CNPS: 1B.1
Annual herb occurring in chaparral, coastal
dunes, coastal scrub openings, and
cismontane woodland between 0 and 300 m
in elevation. San Luis Obispo and Santa
Barbara counites.

April–September Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal dunes, coastal scrub openings, and
cismontane woodland habitat is absent.

Crisp
monardella
Monardella
undulata ssp. crispa
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 120 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

April–August Not expected. There are no known records of occurrence in project vicinity and coastal
dunes and coastal scrub habitat is absent.

San Luis Obispo
monardella
Monardella
undulata ssp.
undulata
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
coastal dunes and coastal scrub between 10
and 200 m in elevation. Found in San Luis
Obispo and Santa Barbara counites.

May–September Not expected. There are two known records of occurrence in the project vicinity (CNDDB
1979) and coastal dunes and coastal scrub
habitat is absent.

Aparejo grass Muhlenbergia utilis US: –
CA: –
CNPS: 2B.2
Perennial rhizomatous herb occurring in
chaparral, coastal scrub, meadows, seeps,
marches/swamps, and cismontane
woodland between 25 and 2,325 m in
elevation. Found in Central Coast and
Central Valley counties.

March–October Not expected. There are no known records of occurrence in project vicinity and chaparral,
coastal scrub, meadows, seeps,
marches/swamps, and cismontane woodland
habitat is absent.

Gambel's water
cress
Nasturtium
gambelii
US: FE
CA: CT
CNPS: 1B.1
Perennial rhizomatous herb occurring in
marshes and swamps (brackish, freshwater)
between 5 and 330 m in elevation. Found in
Santa Barbara, San Luis Obispo, Los Angeles
and Orange counties.

April–October Not expected. There are no known records of occurrence in project vicinity and marshes
and swamps habitat is absent.

Coast woolly-headsNemacaulis
denudata var.
denudate
US: –
CA: –
CNPS: 1B.2
Annual herb occurring in coastal dunes
between 0 and 100 m in elevation. Found in
Los Angeles, Orange, San Diego, and San
Luis Obispo counties.

April-September Not expected. There are no known records of occurrence in project vicinity and coastal
dunes habitat is absent.

E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-1: Regional Special-Status Plant Species
Common
Name Scientific Name Status General Habitat Description Flowering Period Likelihood of Occurrence on the Project
Site and Rationale
Black-flowered
figwort
Scrophularia atrata US: –
CA: –
CNPS: 1B.2
Perennial herb occurring in chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub between
10 and 500 m in elevation. San Luis Obispo
and Santa Barbara counites.

March–July Not expected. There are no known records of
occurrence in project vicinity and chaparral,
closed-cone coniferous forest, coastal scrub,
coastal dunes, and riparian scrub habitat is
absent.

San Bernardino
aster
Symphyotrichum
defoliatum
US: –
CA: –
CNPS: 1B.2
Perennial rhizomatous herb occurring in
cismontane woodland, coastal scrub, lower
montane coniferous forest, meadows,
seeps, marshes and swamps and
valley/foothill grassland (vernally mesic)
between 2 and 2,040 m in elevation. Found
in Southern California counties.

July–November Not expected. There are no known records of occurrence in project vicinity and cismontane
woodland, coastal scrub, lower montane
coniferous forest, meadows, seeps, marshes
and swamps and valley/foothill grassland
(vernally mesic) is absent.
1 Project vicinity = Project plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (CFP), California Special Plant (CSP), California Special Animal (CSA) California Native Plant Society Designations:
1B = Rare, threatened, or endangered in California and elsewhere 2B = Rare, threatened, or endangered in California, but not elsewhere

0.1 = seriously endangered

0.2 = fairly endangered
CA = California
CNPS = California Native Plant Society
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States
E-1

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale

CRUSTACEANS
Vernal pool fairy
shrimp
Branchinecta lynchi US: FT
CA: –
Endemic to the grasslands of the Central Valley, Central Coast mountains, and South Coast mountains, in astatic
rain-filled pools. Inhabit small, clear-water sandstone-depression pools and grassed swale, earth slump, or basalt-flow depression pools.

Not expected. There is one known record
of occurrence in the project vicinity 1
(CNDDB 2006) and vernal pool habitat is
absent from the project site.

INSECTS
Monarch - California
overwintering
population
Danaus plexippus
pop. 1
US: FC
CA: SA
Winter roost sites extend along the coast from northern Mendocino to Baja California, Mexico. Roosts in wind-protected tree groves (eucalyptus, Monterey pine, cypress), with nectar and water sources nearby.

Not expected. There are six known
records of occurrence in the project
vicinity (CNDDB 1998, 2012, 2017,2022)
and suitable roosting trees and milkweed
are absent.

FISH
Tidewater goby Eucyclogobius
newberryi
US: FE
CA: –
Brackish water habitats along the California coast from Agua Hedionda Lagoon, San Diego County to the mouth of
the Smith River. Found in shallow lagoons and lower
stream reaches, they need fairly still but not stagnant water and high oxygen levels.

Not expected. There are no known
records of occurrence in the project
vicinity. No brackish water or lagoons are
present in the project site.

Unarmored
threespine
stickleback
Gasterosteus
aculeatus
williamsoni
US: FE
CA: CE
Weedy pools, backwaters, and among emergent
vegetation at the stream edge in small Southern California streams. Cool (<24 C), clear water with abundant
vegetation.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Arroyo chub Gila orcuttii US: –
CA: SSC
Native to streams from Malibu Creek to San Luis Rey River basin. Introduced into streams in Santa Clara, Ventura, Santa Ynez, Mojave and San Diego river basins. Slow
water stream sections with mud or sand bottoms. Feeds
heavily on aquatic vegetation and associated
invertebrates.

Not expected. There are no known
records of occurrence in the project
vicinity. No streams with emergent
vegetation is present within the project
site.

Steelhead - Southern
California DPS
Oncorhynchus
mykiss irideus pop.
10 US: FE
CA: –
Federal listing refers to populations from Santa Maria
River south to southern extent of range (San Mateo Creek in San Diego County). Southern steelhead likely have
greater physiological tolerances to warmer water and
more variable conditions.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project.

E-2

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
steelhead - south-central California
coast DPS
Oncorhynchus
mykiss irideus pop.
9 US: FT
CA: –
Federal listing refers to runs in coastal basins from the Pajaro River south to, but not including, the Santa Maria River.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project.

AMPHIBIANS
California tiger
salamander - Santa
Barbara County DPS
Ambystoma
californiense pop. 2
US: FE
CA: CT
Lives in vacant or mammal-occupied burrows throughout
most of the year; in grassland, savanna, or open woodland habitats. Needs underground refuges, especially ground
squirrel burrows, and vernal pools or other seasonal water sources for breeding.

Low probability of occurrence. There are
10 known records of occurrence in the
project vicinity with the most recent from
2014 (CNDDB 2024). While there are no
vernal pools present within the project
site, CTS have been documented to breed
in sewage treatment plants. Furthermore,
active California ground squirrel burrows
were observed within the WWTP that
could provide upland sheltering habitat.

The project site is just outside the 2-mile
dispersal range of known breeding ponds,
there is some potential that CTS could use
the WWTP for breeding and upland
habitat.

Arroyo toad Anaxyrus californicus US: FE
CA: SSC
Semi-arid regions near washes or intermittent streams,
including valley-foothill and desert riparian, desert wash, etc. Rivers with sandy banks, willows, cottonwoods, and sycamores; loose, gravelly areas of streams in drier parts of range.

Not expected. There are no records of
occurrence in the project vicinity and
suitable aquatic/stream habitat is absent
from the project site.

Foothill yellow-legged frogRana boylii US: –
CA: CE, SSC
Partly-shaded, shallow streams and riffles with a rocky substrate in a variety of habitats. Needs at least some cobble-sized substrate for egg-laying. Needs at least 15 weeks to attain metamorphosis.

Not expected. There are no known
historical records of occurrence in the
project vicinity. No aquatic habitat is
present in the project site.

California red-legged
frog
Rana draytonii US: FT
CA: SSC
Lowlands and foothills in or near permanent sources of
deep water with dense, shrubby or emergent riparian
vegetation. Prefers aquatic habitat with deep (2 feet or deeper) areas
with undercut banks, emergent aquatic vegetation, and
bank cover. Does not occur in salt marshes or wetland with brackish water.

Low to moderate probability of
occurrence. There are 28 records of
occurrence in the project vicinity with the
most recent from 2007 (CNDDB 2024).

CLRF have potential to use the WWTP as
breeding, non-breeding, and dispersal
habitat. Several active California ground
squirrel burrows were observed in the
E-3

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
WWTP that could provide upland habitat.

Furthermore, several burrows were
observed along the eastern margin of the
project site adjacent to the agricultural
row crops that could provide upland
dispersal/sheltering habitat. These
burrows are in close proximity to several
irrigation basins located immediately
outside the project site boundary that
could provide habitat for CRLF.

Western spadefoot Spea hammondii US: –
CA: SSC
Occurs primarily in grassland and other relatively open habitats. Found in elevations ranging from sea level to 4,500 ft. Requires temporary pools for breeding.

Low to moderate probability of
occurrence. There are 17 records of
occurrence in the project vicinity with the
most recent from 2010 (CNDDB 2024).

The project site does not contain aquatic
habitat suitable for breeding. However,
several burrows were observed along the
eastern margin of the project site that
could provide upland dispersal/sheltering
habitat. These burrows are in close
proximity to several irrigation basins
located immediately outside the project
site boundary.

REPTILES
Northern California
legless lizard
Anniella pulchra US: –
CA: SSC
Sandy or loose loamy soils under sparse vegetation. Soil moisture is essential. They prefer soils with a high moisture content.

Low probability of occurrence. There are
15 records of occurrence in the project
vicinity with the most recent from 2016
(CNDDB 2024). Portions of the WWTP site
could provide suitable habitat. Although,
the routine maintenance and
longstanding agricultural activities reduce
suitability.

E-4

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
Western pond turtle Emys marmorata US: –
CA: SSC
A thoroughly aquatic turtle of ponds, marshes, rivers,
streams and irrigation ditches, usually with aquatic
vegetation, below 6000 ft elevation. Needs basking sites and suitable (sandy banks or grassy open fields) upland habitat up to 0.5 km from water for egg-laying.

Low to moderate probability of
occurrence. There is one record of
occurrence in the project vicinity (CNDDB
1995). Pond turtles have been
documented to breed and thrive in
sewage plants. Therefore, the WWTP has
potential to support aquatic and breeding
habitat. The agricultural portions of the
site do not contain aquatic or upland
habitat.

Coast horned lizard Phrynosoma
blainvillii
US: –
CA: SSC
Frequents a wide variety of habitats, most common in
lowlands along sandy washes with scattered low bushes.

Open areas for sunning, bushes for cover, patches of loose soil for burial, and abundant supply of ants and other
insects.

Low probability of occurrence. There are
three records of occurrence in the project
vicinity (CNDDB 2008, 2015). Portions of
the WWTP site could provide suitable
habitat. Although, the routine
maintenance and longstanding
agricultural activities reduce suitability.

Two-striped garter
snake
Thamnophis
hammondii
US: –
CA: SSC
Coastal California from Salinas to northwest Baja,
California; sea level to 7,000-foot elevation. Found in and near permanent freshwater streams with rocky beds and
riparian growth.

Not expected. There are no known
records of occurrence in the project
vicinity. The project site does not contain
suitable aquatic habitat.

BIRDS
Tricolored blackbird
(breeding colony)
Agelalus tricolor US: –
CA: CT, SSC
Occurs in open country or marshes in large colonies
mainly in California’s Central Valley. Breeds in freshwater marshes with tall emergent vegetation, feeds on insects.

Low to Moderate probability of nesting
and foraging. There are no known records
of occurrence in the project vicinity.

Several eBird records have documented
tricolored within the WWTP as recently as
2022. Emergent vegetation is present
along the perimeter of the ponds within
the WWTP and could provide suitable
nesting and foraging habitat.

Burrowing owl Athene cunicularia US: –
CA: SSC
Open, dry annual or perennial grasslands, deserts, and
scrublands characterized by low-growing vegetation.

Subterranean nester, dependent upon burrowing
mammals, most notably, the California ground squirrel.

Low to Moderate probability of
occurrence. There are two known records
of occurrence in the project vicinity
(CNDDB 2003, 2009). Several eBird
records have documented tricolored
E-5

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the WWTP as recently as 2010.

California ground squirrel burrows were
observed within the WWTP and could
provide nesting habitat.

Swainson's hawk Buteo swainsoni US: –
CA: CT
Breeds in grasslands with scattered trees, juniper-sage flats, riparian areas, savannahs, and agricultural or ranch lands with groves or lines of trees. Requires adjacent
suitable foraging areas such as grasslands, or alfalfa or grain fields supporting rodent populations.

Low to moderate probability of foraging,
nesting not expected. There is one
historical of occurrence in the project
vicinity (CNDDB 1896). There are several
eBird records within the vicinity of the
project with the most recent from 2018.

Suitable foraging habitat is present within
the project site.

Western snowy
plover
Charadrius
alexandrines
nivosus
US: FT
CA: SSC
Sandy beaches, salt pond levees and shores of large alkali lakes. Requires barren areas with sandy, gravelly or friable soils for nesting.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

American peregrine
falcon
Falco peregrinus
anatum
US: FD
CA: CD, FP
Near wetlands, lakes, rivers, or other water; on cliffs, banks, dunes, mounds; also, human-made structures.

Nest consists of a scrape or a depression or ledge in an open site.

Moderate probability of foraging, nesting
not expected. There are no known
records of occurrence in the project
vicinity. Several eBird records have
documented the species as recently as
2022 and one eBird record documented
the species within the WWTP in 2013.

Suitable nesting habitat is absent from the
project site, marginal foraging habitat is
present.

California black rail Laterallus
jamaicensis
coturniculus
US: –
CA: CT, FP
Inhabits freshwater marshes, wet meadows and shallow
margins of saltwater marshes bordering larger bays.

Needs water depths of about 1 inch that do not fluctuate during the year and dense vegetation for nesting habitat.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Yellow warbler Setophaga petechia US: –
CA: SSC
Riparian plant associations in close proximity to water.

Also nests in montane shrubbery in open conifer forests in Cascades and Sierra Nevada. Frequently found nesting
and foraging in willow shrubs and thickets, and in other riparian plants including cottonwoods, sycamores, ash,
and alders.

Low to moderate probability of nesting
and foraging. There are no records of
occurrence in the project vicinity. There
are two eBird records of yellow warbler
within the WWTP as recently as 2020 and
several other eBird records from 2024
E-6

BIOLOGICAL RESOURCES T ECHNICAL MEMORANDUM
J ULY 2024

S ANTA MARIA WASTEWATER T REATMENT P ROJECT

S ANTA MARIA, C ALIFORNIA
P:\20241463 CPZ Santa Maria WWTP\TECHNICAL\Bio\Santa Maria WWTP Memo.docx (07/08/24) Table E-2: Regional Special-Status Animal Species
Common Name Scientific Name Status Listing Habitat and Comments Likelihood of Occurrence on the Project and Rationale
within the vicinity. The WWTP contains
suitable foraging and nesting habitat.

California least tern Sternula antillarum
browni
US: FE
CA: CE, FP
Nests along the coast from San Francisco Bay south to
northern Baja California. Colonial breeder on bare or
sparsely vegetated, flat substrates: sand beaches, alkali flats, land fills, or paved areas.

Not Expected. There are no records of
occurrence in the project vicinity. Suitable
habitat is absent from the project site.

There are no eBird records for this species
in the project vicinity.

Least Bell's vireo Vireo bellii pusillus US: FE
CA: CE
Summer resident of Southern California in low riparian in vicinity of water or in dry river bottoms; below 2000 ft.

Nests placed along margins of bushes or on twigs
projecting into pathways, usually willow, Baccharis,
mesquite.

Not Expected. There are no known
historical records of occurrence in the
project vicinity or documented eBird
records. Marginal nesting Suitable nesting
habitat is present in the WWTP.

MAMMALS
Pallid bat Antrozous pallidus US: –
CA: SSC
Deserts, grasslands, shrublands, woodlands and forests.

Most common in open, dry habitats with rocky areas for
roosting.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Townsend's big-eared batCorynorhinus
townsendii
US: –
CA: SSC
Throughout California in a wide variety of habitats. Most common in mesic sites. Roosts in the open, hanging from walls and ceilings. Roosting sites limiting. Extremely
sensitive to human disturbance.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

Western red bat Lasiurus blossevillii US: –
CA: SSC
Roosts primarily in trees, 2–40 ft above ground, from sea level up through mixed conifer forests. Prefers habitat edges and mosaics with trees that are protected from
above and open below, with open areas for foraging.

Roosting Not Expected. There are no
known records of occurrence in the
project vicinity and suitable roosting
habitat is absent.

American badger Taxidea taxus US: –
CA: SSC
Most abundant in drier open stages of most shrub, forest, and herbaceous habitats, with friable soils. Needs
sufficient food, friable soils and open, uncultivated
ground. Preys on burrowing rodents. Digs burrows.

Not Expected. There are four records of
occurrence in the project vicinity (CNDDB
1984, 1988, 1989, 1991) and suitable
habitat is absent.
1 Project vicinity = Project site plus a 5-mile buffer
Status: Federal Endangered (FE), Federal Threatened (FT), Federal Candidate (FC), Federal Proposed (FP, FPE, FPT), Federal Delisted (FD), California Endangered (CE), California Threatened (CT), California Species of Special Concern (SSC), California Fully Protected Species (FP), California Special Animal (CSA) CA = California
DPS= Distinct Population Segment
ft = foot/feet
m = meter/meters
mi = mile/miles
US = United States

CARLSBAD
CLOVIS

EMERYVILLE
IRVINE

LOS ANGELES

PALM SPRINGS

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
6001 Shellmound Street, Suite 425, Emeryville, California 94608 510.236.6810 www.lsa.net

MEMORANDUM
DATE: February 19, 2026
TO: Graham Juby, Carollo Engineers
FROM: David Muth, Wildlife Biologist
Mike Trueblood, Associate/Wildlife Biologist
SUBJECT: Results of Habitat Assessment – Santa Maria Wastewater Treatment Plant Improvements Project (LSA Project # 20241463)
On Wednesday, February 11, 2026, LSA wildlife biologist David Muth conducted a field survey/habitat asssessment of the Santa Maria Wastewater Treatment Plant (WWTP) Improvements Project site (site) located along the western edge of the City of Santa Maria in Santa Barbara County.

The entire site was assessed to determine the potential for California tiger salamander (CTS; Ambystoma californiense), western spadefoot (WST; Spea hammondi), California red-legged frog (CRFL; Rana draytonii), and/or southwestern pond turtle (SWPT; Actinemys pallida) to occur on the site.

The site consists of the existing 210-acre WWTP facility west of Black Road and approximately 42 acres of City-owned land east of Black Road currently being used for interim agricultural production.

The portion of the site west of Black Road includes the existing WWTP, which consists primarily of developed areas covered by asphalt or cement, excavated earthen ponds, and occasional ruderal vegetation. The portion of the site located east of Black Road consists of an agricultural field that is mostly barren, with small areas supporting ruderal vegetation.

The site is unsuitable to support CTS, WST, CRFL, or SWPT. There is no upland habitat or aquatic breeding habitat, nor are there corridors for individuals in nearby occupied locations to move onto the site.

The site and all the areas within the 0.5 mile surrounding it are located on lands that have been under intense agricultural use since at least 1984 and likely well before. By 2009, all the lands within 2 miles of the site had been converted to similar agricultural uses. The grassland habitats that would have historically occurred on the site have been replaced by monocrop agriculture, development, and small, disturbed ruderal patches. The portions of the site that are not covered by asphalt or cement are in a constant state of disruption, either (1) as percolation ponds are regularly filled with treated effluent, drained, dried out, ripped and re-filled in a continuous cycle or (2) due to annual agricultural practices, including repeatedly tilling the soil, watering plants, treating for weeds, and mechanized harvesting. While the original upland habitats would have been suitable for CTS or WST 2/25/26 «P:\2024\20241463.02 Santa Maria Herp Assessment\SantaMaria_Habitat Asessment_rev.docx» 2 prior to farming, the levelling of the land during initial farming would have extirpated all populations of these species if any were present. The pavement and constant continued disturbance of the soils on the site prevent recolonization by most grassland species should any individual access the site.

There is no opportunity for CTS or WST to occur on the site.

The original upland habitats on the site are unlikely to have ever supported populations of CRLF or SWPT, species that require perennial waterbodies. There are now three types of water features on the site: sludge drying beds, percolation ponds, and trickling filters/clarifiers. All three types are in active use for the treatment of wastewater. The trickling filters/clarifiers were built with vertical walls that include an 8-inch to 3-foot wall extending above the ground. The walls prevent entry by species on the outside of the ponds, and the vertical edges prevent the formation of upland retreats necessary for basking by CRLF and SWPT. The water regime used for the sludge drying beds and percolation ponds is to fill these features and then allow them to dry. The percolation ponds drain through the soil into the underground water table and are then refilled. The constant draining and refilling prevent the formation of suitable habitat for SWPT or CRLF. The sludge drying beds dry by evaporation in the sunlight. These are shallow, cement lined pools that are refilled with digested solids until the basins are completely inundated with solid waste. The partially dry solids material is then removed with large equipment. None of these features provide suitable aquatic habitat for CRLF or SWPT, nor can they be used as breeding habitat by CTS or WST.

The continual farming practices on the surrounding lands prevent the movement of CTS, WST, CRLF, or SWPT from existing off-site populations onto the site. Any individual moving across this landscape is likely to be killed by farm equipment, roadway traffic, or predators. The continual farming operations also prevent the formation of any corridors that would allow species movement. It is not possible for any of these species to reach the project site from outside localities.

The project as proposed should have no effect on CTS, WST, CRLF, or SWPT.

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26)

APPENDIX C

NOISE MEASUREMENT SHEETS

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26) This page intentionally left blank
Noise Measurement Survey – 24 HR
Project Number: 20241463 Test Personnel: Dana Kwan
Project Name: Santa Maria WWTP Equipment: Spark 706RC (SN:18907) Site Number: LT-1 Date: 7/8/25 Time: From 6:00 p.m. To 6:00 p.m.

Site Location: North of 410 Black Road, Santa Maria, CA 93458. On a utility pole, approximately 30 feet east of the Black Road centerline.

Primary Noise Sources: Vehicle traffic on Black Road, faint humming noise from Lazer Broadcasting across Black Road, occasional aircraft.

Comments:

Photo:

Long-Term (24-Hour) Noise Level Measurement Results at LT-1 Start Time Date Noise Level (dBA)
Leq Lmax Lmin
6:00 PM 7/8/25 70.2 89.9 48.2
7:00 PM 7/8/25 69.9 95.8 47.2
8:00 PM 7/8/25 65.3 86.1 45.9
9:00 PM 7/8/25 65.7 85.4 46.1
10:00 PM 7/8/25 64.0 87.9 37.8
11:00 PM 7/8/25 62.0 82.4 36.9
12:00 AM 7/9/25 60.2 85.3 36.8
1:00 AM 7/9/25 58.8 87.5 36.1
2:00 AM 7/9/25 54.8 80.4 35.0
3:00 AM 7/9/25 64.2 83.4 35.4
4:00 AM 7/9/25 66.9 83.8 36.6
5:00 AM 7/9/25 72.1 86.2 39.4
6:00 AM 7/9/25 72.4 92.0 39.1
7:00 AM 7/9/25 71.8 89.1 39.2
8:00 AM 7/9/25 71.4 87.9 38.0
9:00 AM 7/9/25 72.1 91.0 40.1
10:00 AM 7/9/25 71.0 91.0 41.7
11:00 AM 7/9/25 72.4 97.8 41.3
12:00 PM 7/9/25 73.8 97.7 50.4
1:00 PM 7/9/25 74.8 91.7 53.2
2:00 PM 7/9/25 74.5 91.7 51.4
3:00 PM 7/9/25 74.6 88.8 52.0
4:00 PM 7/9/25 74.0 96.2 51.7
5:00 PM 7/9/25 72.7 88.1 50.7
Source: Compiled by LSA Associates, Inc. (2025).
dBA = A-weighted decibel
Leq = equivalent continuous sound level
Lmax = maximum instantaneous noise level
Lmin = minimum measured sound level

0.0 20.0

40.0 60.0

80.0 100.0
120.0
6:00 PM7:00 PM8:00 PM9:00 PM
10:00 PM11:00 PM
12:00 AM
1:00 AM2:00 AM3:00 AM4:00 AM5:00 AM6:00 AM7:00 AM8:00 AM9:00 AM 10:00 AM11:00 AM
12:00 PM
1:00 PM2:00 PM3:00 PM4:00 PM5:00 PM
Noise Level (dBA Leq)
Time of Day
Long-Term (24-Hour) Noise Level Measurement
LT-1
Leq Lmax Lmin
Noise Measurement Survey – 24 HR
Project Number: 20241463 Test Personnel: Dana Kwan
Project Name: Santa Maria WWTP Equipment: Spark 706RC (SN:17119) Site Number: LT-2 Date: 7/8/25 Time: From 6:00 p.m. To 6:00 p.m.

Site Location: 1482 Black Road, Santa Maria, CA 93458. On a utility pole, approximately 20 feet east of the Black Road centerline.

Primary Noise Sources: Vehicle traffic on Black Road, wind.

Comments: Buzz from power line when retrieving monitor.

Photo:

Long-Term (24-Hour) Noise Level Measurement Results at LT-2 Start Time Date Noise Level (dBA)
Leq Lmax Lmin
6:00 PM 7/8/25 73.2 93.9 40.4
7:00 PM 7/8/25 68.4 87.0 40.1
8:00 PM 7/8/25 70.1 91.5 39.1
9:00 PM 7/8/25 64.6 83.4 39.6
10:00 PM 7/8/25 62.5 85.7 37.6
11:00 PM 7/8/25 64.9 87.8 36.2
12:00 AM 7/9/25 60.0 83.6 37.0
1:00 AM 7/9/25 61.2 88.4 35.4
2:00 AM 7/9/25 57.1 84.4 34.9
3:00 AM 7/9/25 65.5 83.6 34.5
4:00 AM 7/9/25 65.1 85.5 34.8
5:00 AM 7/9/25 72.7 88.5 38.0
6:00 AM 7/9/25 73.0 88.9 37.6
7:00 AM 7/9/25 71.5 90.1 38.6
8:00 AM 7/9/25 71.2 88.8 38.9
9:00 AM 7/9/25 72.7 90.6 41.8
10:00 AM 7/9/25 71.0 90.3 40.9
11:00 AM 7/9/25 74.0 95.7 40.1
12:00 PM 7/9/25 72.5 92.1 45.2
1:00 PM 7/9/25 75.5 95.1 50.3
2:00 PM 7/9/25 73.6 87.9 50.6
3:00 PM 7/9/25 73.9 88.6 49.6
4:00 PM 7/9/25 73.0 87.8 48.4
5:00 PM 7/9/25 74.4 94.3 47.3
Source: Compiled by LSA Associates, Inc. (2025).
dBA = A-weighted decibel
Leq = equivalent continuous sound level
Lmax = maximum instantaneous noise level
Lmin = minimum measured sound level

0.0 20.0

40.0 60.0

80.0 100.0
120.0
6:00 PM7:00 PM8:00 PM9:00 PM
10:00 PM11:00 PM
12:00 AM
1:00 AM2:00 AM3:00 AM4:00 AM5:00 AM6:00 AM7:00 AM8:00 AM9:00 AM 10:00 AM11:00 AM
12:00 PM
1:00 PM2:00 PM3:00 PM4:00 PM5:00 PM
Noise Level (dBA Leq)
Time of Day
Long-Term (24-Hour) Noise Level Measurement
LT-2
Leq Lmax Lmin
Noise Measurement Survey – 24 HR
Project Number: 20241463 Test Personnel: Dana Kwan
Project Name: Santa Maria WWTP Equipment: Spark 706RC (SN:17815) Site Number: LT-3 Date: 7/8/25 Time: From 6:00 p.m. To 6:00 p.m.

Site Location: North of 1689 West Stowell Avenue, Santa Maria, CA 93458. On a utility pole, approximately 2,210 feet north of West Stowell Road.

Primary Noise Sources: Very faint vehicle traffic from West Stowell Avenue, Hanson Way, Black Road, and West Main Street, faint noise from wind and from sprinkler system.

Comments:

Photo:

Long-Term (24-Hour) Noise Level Measurement Results at LT-3 Start Time Date Noise Level (dBA)
Leq Lmax Lmin
6:00 PM 7/8/25 64.5 77.9 47.4
7:00 PM 7/8/25 60.7 73.0 47.4
8:00 PM 7/8/25 55.3 68.1 43.0
9:00 PM 7/8/25 56.5 76.2 40.2
10:00 PM 7/8/25 43.2 60.0 39.3
11:00 PM 7/8/25 49.2 76.2 39.9
12:00 AM 7/9/25 43.2 50.5 40.2
1:00 AM 7/9/25 43.4 52.7 36.6
2:00 AM 7/9/25 46.1 72.1 36.6
3:00 AM 7/9/25 39.7 53.6 35.8
4:00 AM 7/9/25 43.1 68.0 36.9
5:00 AM 7/9/25 54.1 77.7 38.1
6:00 AM 7/9/25 56.1 80.9 38.0
7:00 AM 7/9/25 61.4 83.3 39.3
8:00 AM 7/9/25 51.8 64.1 38.8
9:00 AM 7/9/25 53.7 77.7 38.3
10:00 AM 7/9/25 66.2 87.8 43.2
11:00 AM 7/9/25 60.1 79.3 41.7
12:00 PM 7/9/25 67.6 81.7 48.1
1:00 PM 7/9/25 73.3 87.0 56.3
2:00 PM 7/9/25 74.5 83.7 60.5
3:00 PM 7/9/25 72.5 85.0 59.8
4:00 PM 7/9/25 70.2 89.9 54.6
5:00 PM 7/9/25 67.9 78.9 52.1
Source: Compiled by LSA Associates, Inc. (2025).
dBA = A-weighted decibel
Leq = equivalent continuous sound level
Lmax = maximum instantaneous noise level
Lmin = minimum measured sound level

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0
100.0
6:00 PM7:00 PM8:00 PM9:00 PM
10:00 PM11:00 PM
12:00 AM
1:00 AM2:00 AM3:00 AM4:00 AM5:00 AM6:00 AM7:00 AM8:00 AM9:00 AM 10:00 AM11:00 AM
12:00 PM
1:00 PM2:00 PM3:00 PM4:00 PM5:00 PM
Noise Level (dBA Leq)
Time of Day
Long-Term (24-Hour) Noise Level Measurement
LT-3
Leq Lmax Lmin

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26)

APPENDIX D

OPERATIONAL NOISE GRAPHIC

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26) This page intentionally left blank
PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: Project Noise and Runtime Estimates
DESCRIPTION : Barndepho w/ PCs and Digs
JOB # : 202301
* = rating typcially at 3 ft from unit
No. of Operating
Units
No. of Standby
Units
Motor Power
(hp)
Total Operating
Motor Power (hp)
Power Input
(KW)
Operation
Time (hr/day) Annual KWh
Max Noise Rating
(dBA) - based on
Specification *
Location
1 Headworks
Huber RotaSHIELD Septage 2 1 1 1 1 6 931 85 Outdoors
Huber WAP Compactor 2 1 5 10 7 6 9,306 85 Outdoors
Screens 1 0 7 7 5 24 45,726 85 Outdoors
Grit Pumps 1 0 5 5 4 12 16,331 85 Outdoors
2 Primary Treatment 1 1 42 42 31 24 274,358 85 Outdoors Influent Pumps 2 2 50 100 75 24 653,233 85 Outdoors
3 Aeration Basin
Mixers 6 0 15 90 67 24 587,910 85 Submerged in basins
Blowers 2 1 321 643 479 24 4,197,713 88 In sound-proof enclosure in a building Drain Pumps 1 0 30 30 22 1 8,165 85 Indoors
MLR Pumping 3 0 17 50 37 24 327,628 85 Submerged in basins 4 Secondary Clarifiers
Mechanism 2 1 10 20 15 24 130,647 85 Outdoors
RAS pumping 2 1 75 150 112 24 982,885 85 Outdoors in below grade pit WAS pumping 1 1 2 2 2 5 2,867 85 Outdoors in below grade pit 5 Filters
Filter Influent pumps 1 1 75 75 56 24 491,442 85 Outdoors Filter backwash pumping 1 1 38 38 28 1 10,238 85 Outdoors 6 Effluent Pump Station
Effluent pumps 3 1 50 150 112 12 489,925 85 Outdoors
7 Utility Water PS
UW pumps (large) 2 1 100 200 149 2 108,872 85 Outdoors
UW pumps (small) 1 1 50 50 37 12 163,308 85 Outdoors
8 Chemical Addition
Methanol << 85 Minimal - small dosing pump
9 Primary Scum
Scum Pumps 2 1 2 4 3 4 4,718 85 Outdoors submerged in a pit 10 Secondary Scum
Scum Pumps 2 1 2 4 3 4 4,718 85 Outdoors submerged in a pit 11 Sludge Thickening
Thickeners 3 1 2.55 8 6 7 10,382 85 Indoors
Thickened Sludge Pumps 2 1 6.375 13 10 7 17,304 85 Indoors Polymer Pumps 3 1 1.7 5 4 7 6,922 85 Indoors
Drain Pumps 1 1 8.5 9 6 7 11,536 85 Indoors
Grinders 3 1 5 15 11 7 20,358 85 Indoors
12 Anaerobic Digestion
Mixing Pumps 2 2 63.75 128 95 24 832,872 85 Outdoors
Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 85 Indoors Recirculation Pumps 2 1 63.75 128 95 7 242,921 85 Indoors 13 Sludge Storage
Sludge Transfer Pumps 2 1 21.25 43 32 7 80,974 85 Outdoors 14 Dewatering Building
Screw Press 3 1 6.375 19 14 7 25,956 85 Indoors
Polymer Metering Pump 3 1 1.7 5 4 7 6,922 85 Indoors
Filtrate Pump 1 1 17 17 13 7 23,072 85 Indoors
Cake Conveyor 3 0 8.5 26 19 7 34,608 85 Indoors
Process Power Noise
Santa Maria WWTP
Project No. 20241463
Project Operational Noise Levels
Hourly Noise
Level (dBA Leq)
<= 49.0

49.0< <= 51.0

51.0< <= 53.0

53.0< <= 55.0

55.0< <= 57.0

57.0< <= 59.0

59.0< <= 61.0

61.0< <= 63.0

63.0< <= 65.0

65.0< <= 67.0

67.0< <= 69.0

69.0<
Scale
0 50 100 200 300 400
feet
Signs and symbols
Point source
Limit line - 55 dBA
C:\Users\MAbushanab\OneDrive - LSA Associates\Documents\Desktop\SoundPLAN\20241463 - Santa Maria WWTP\ops.sgs - last edit 4/3/2026

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26)

APPENDIX E

RESPONSE TO COMMENTS

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26) This page intentionally left blank

CARLSBAD
CLOVIS

EMERYVILLE
IRVINE

LOS ANGELES

PALM SPRINGS

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
860 Walnut Street, Suite B, San Luis Obispo, California 93401 805.782.0745 www.lsa.net

MEMORANDUM
DATE: September 25, 2026
TO: Graham Juby, Carollo Engineers
FROM: Pam Reading, Principal
Shanna Guiler, AICP Associate/Senior Environmental Planner SUBJECT: Santa Maria Wastewater Treatment Plant Improvements Project Initial Study/Mitigated Negative Declaration - Response to Comments In accordance with Section 15074 of the State California Environmental Quality Act (CEQA) Guidelines, prior to approving a project, the decision-making body of the lead agency shall consider the proposed environmental document together with any comments received during the public review process. Although there is no legal requirement to formally respond to comments on a proposed Mitigated Negative Declaration (MND) as there is for an Environmental Impact Report (EIR), this memorandum provides a response to the written comments received on the Santa Maria Wastewater Treatment Plant Improvements Project Initial Study/Mitigated Negative Declaration (IS/MND) to aid the City of Santa Maria (City) decision-makers in their review of the project.

The IS/MND was circulated for public review for a period of 35 days, from July 21, 2026, to August 19, 2026. Two comment letters were received during the public review period. In the following pages, the comments and responses are enumerated to allow for cross-referencing of CEQA related comments. The enumerated comment letters are included in this memorandum, followed by the respective responses.

As noted above, CEQA does not require or provide guidance on responding to comments on MNDs; therefore, this memorandum follows State CEQA Guidelines Section 15088, applicable to responses to comments on EIRs, which requires that agencies respond only to significant environmental issues raised in connection with the project. Therefore, this document focuses primarily on responding to comments that relate to the adequacy of the information and environmental analysis provided in the IS/MND.

Written responses to all written comments on the IS/MND are provided below. The enumerated comment letters are included, followed by the respective responses. Mitigation measures identified 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 2 in the IS/MND are incorporated into the Mitigation Monitoring and Reporting Program (MMRP). The City will adopt the MMRP if it adopts the IS/MND.

COMMENTS AND RESPONSES
This section includes responses to each substantive CEQA-related comment. Each comment letter is assigned a letter (A, B) and individual comments within each letter are numbered consecutively. For instance, comment A-1 is the first numbered comment in Letter A. Please note that text within individual letters that has not been numbered does not raise environmental issues or relate to the adequacy of the information or analysis within the IS/MND, and therefore, no comment is enumerated or response required, per State CEQA Guidelines Section 15132.

The following comment letters were submitted:

Letter A
Department of Water Resources, Zack Ramsey, Manager
July 28, 2026
Letter B
Santa Barbara County Air Pollution Control District, Emily Waddington, Air Quality Specialist August 19, 2026
Where revisions to the IS/MND text are called for, the page is set forth followed by the appropriate revision. Added text is indicated with double underlined text, and deleted text is shown in strikeout.

As described herein, these changes have been made to clarify, amplify, or make minor edits to the IS/MND text for the proposed project. Such changes are a result of further review of, and public comments related to, the IS/MND. The changes are generally minor changes that do not constitute significant new information, change the conclusions of the environmental analysis, or require recirculation of the document (State CEQA Guidelines Section 15073.5).

A
A-3
A-1
A-2
A-3
cont.

A-4
9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 5

LETTER A
Department of Water Resources, Zack Ramsey, Manager
July 28, 2026
Response A-1 This comment provides a summary of the proposed project and does not address the adequacy of the information or analysis in the IS/MND.

Therefore, no further response is required.

Response A-2 This comment provides a summary of the project site and surrounding area and does not address the adequacy of the information or analysis in the IS/MND. Therefore, no further response is required.

Response A-3 This comment expresses concern that the proposed project may affect the State Water Project’s Coastal Branch Aqueduct and requests coordination with the Department of Water Resources (DWR) to determine whether the project would impact the pipeline. As described on page 2-9 of the IS/MND, the proposed project would include construction of six new percolation ponds, approximately 7 acres each, totaling approximately 42 acres on approximately 100 acres of City-owned land currently being used for interim agricultural production. The new ponds would be to the east of the existing wastewater treatment plant (WWTP) across Black Road. As part of this near-term project, at least one permanent entrance providing access to the ponds would be constructed along Black Road. This entrance would also be used for ingress and egress during project construction.

There is an existing 30-inch pipeline extending from the percolation pond pump station within the existing WWTP (west of Black Road) that travels under Black Road and crosses the easement established for the State Water Project’s Coastal Branch Aqueduct (SWP easement), which runs north-south along Black Road. This pipeline was installed in 2008 to support future pond construction east of Black Road. Although some piping would be installed on both ends of the existing pipeline to accommodate the proposed project; all work would occur within City owned property, outside of the SWP easement. Minimal driveway improvements would be constructed on Black Road to provide access to the new percolation ponds; however, these are not anticipated to encroach into the SWP easement or affect the Coastal Branch Aqueduct. As indicated in Response A-4, the City of Santa Maria will continue to coordinate with DWR as work proceeds. If needed, the City of Santa Maria will request an encroachment permit from DWR for any proposed work within DWR right of way or work that may affect SWP pipelines.

Response A-4 The comment states that the proposed project may require an Encroachment permit from DWR, provides information on encroachment 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 6 permit requirements, and requests coordination with the DWR for review of the proposed project. As requested, the City of Santa Maria will coordinate with DWR to determine if an encroachment permit is required. If needed, the City of Santa Maria will request an encroachment permit from DWR for any proposed work within DWR right of way or work that may affect State Water Project pipelines. No change to the IS/MND is required.

August 19, 2026
Cody Graybehl Sent Via Email: [email protected] City of Santa Maria
Community Development Department
110 South Pine Street, #101
Santa Maria, California 93458
Re: Santa Barbara County Air Pollution Control District Comments on the Draft Mitigated Negative Declaration for the Santa Maria Wastewater Treatment Plant Improvements Project, SP2025-0010
Dear Cody Graybehl:

The Santa Barbara County Air Pollution Control District (District) has reviewed the Draft Mitigated Negative Declaration (MND) for the referenced project, which consists of the expansion and updating of the existing wastewater treatment plant (WWTP) to accommodate anticipated growth and adhere to applicable regulatory requirements. Immediate work includes constructing six new percolations ponds totaling approximately 42 acres on 100 acres of City-owned land adjacent to the site. New percolation ponds are expected to require 879,000 square feet (SF) of soil excavation with 703,000 SF to be exported. Phase 1 improvements, occurring over an expected timeframe of 2030 to 2035, include upgrades to several structures (two primary clarifiers, two sludge digesters, a gravity thickener, a headworks, maintenance and operations building, and intermediate clarifier) and removal of existing structures (two primary trickling filters, two secondary trickling filters, eight sludge drying beds, two secondary clarifiers, and one grit chamber). Structures to be added during Phase 1 include four aeration basins, one grit chamber, three secondary clarifiers, one tertiary filter, two anaerobic digestors, one dewatering facility, one sludge storage, one digester gas flare (with cogeneration facility), two 2.0 MMBtu hot water boilers, and one cogeneration facility with battery. Demolition activities of Phase 1 are expected to result in 35,000 cubic yards (CY) of material and 46,000 CY of soil excavation for a total of 72,000 CY of material to be exported. Phase 2, occurring over an expected time frame of 2052 to 2060, includes modification and expansion of new constructed facilities including new headworks, expansion of aeration basins, installation of two secondary clarifiers, and sludge storage digestor, as required by the needs of the time. The subject property, a 310-acre parcel identified in the Assessor Parcel Map Book as APNs 113-120-034, 117-191-010, -013, and 117-820-002, and zoned Public Facilities, is located at 601 Black Road in the City of Santa Maria.

Based on the project description and information that has been provided, the proposed project includes equipment and operations subject to District permit requirements and prohibitory rules. Therefore, the District will be a Responsible Agency under the California Environmental Quality Act (CEQA), and will seek to rely on the City’s CEQA determination when evaluating District permits for proposed equipment.

To avoid additional CEQA documentation requirements related to District permit issuance, the CEQA document should include the air pollutant emissions for all proposed equipment and operations in the project’s air quality impact analysis, adequately analyze all potential air quality impacts (including health risk from toxic air contaminants) and include mitigation as appropriate to reduce the impacts.

B
B-1
B-2
District Comments on the Santa Maria Wastewater Treatment Plant Improvements Project, SP2025-0010 August 19, 2026

Page 2 ends

In order to ensure the MND complies with CEQA for the District’s use as a Responsible Agency, , we recommend the following revisions are made to the Draft MND (Section 4.3 Air Quality and Section 4.8 Greenhouse Gas Emissions):

1. Evaluation of Stationary Source Emissions: The analysis does not adequately evaluate emissions from stationary source equipment. To enable the District to rely on the City’s Final MND, all potential emissions from WWTP equipment and operations, including fugitive and combustion-related emissions, should be calculated and compared against the applicable air quality significance thresholds. The current analysis relies on CalEEmod, which only accounts for emissions from the electricity use of stationary source equipment (and fuel use of the boilers), and does not have the capability to comprehensively assess the complete inventory of the proposed project’s emissions sources. Accordingly, supplemental “off-model” emission calculations should be prepared. The District recommends that the following sources are quantified and properly evaluated:
a. Cogeneration engine/turbine combustion: Oxides of nitrogen (NOx), carbon monoxide (CO), reactive organic compounds (ROC), particulate matter (PM), oxides of sulfur (SOx), and greenhouse gases (GHGs) from firing digester gas
b. Digester gas flare combustion: NOx, CO, ROC, PM, SOx, and GHGs including flaring during cogeneration downtime/startup
c. Sludge handling: Fugitive ROC, PM, and GHGs from sludge handling including dewatering, cake storage, and sludge storage
d. Hydrogen sulfide (H2S) and biogas cleanup: including H2S emissions and the emission implications of the control approach (ferrous chloride injection and/or iron sponge/biogas cleanup)
e. Fugitive digester gas leaks: Methane/ROC from digesters, gas piping, pressure-relief valves, and regulators
f. Boilers: The CalEEMod analysis assumes that proposed boilers will use compressed natural gas (CNG). The analysis should be modified if the boilers will use biogas or a combination of biogas and natural gas.
g. Biogas and natural gas combustion for any other equipment: criteria pollutants and GHGs

2. Energy and Water Use: The CalEEMod analysis should be updated to model project-specific energy and water usage amounts for the proposed project. The current analysis is based on default rates for a “General Light Industry” use that are likely not representative of the project.

3. Greenhouse Gas Analysis: The City should consider whether the Draft MND adequately assesses GHG impact criteria “a,” which requires an analysis of whether the project would generate GHGs, either directly or indirectly, that may have a significant impact on the environment. The Initial Study states that the GHG significance determination is based on consistency with the 2022 CARB Scoping Plan and the SBCAG Connected 2050 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). It is our understanding that neither of these plans would meet the definition of a qualified GHG reduction plan consistent with CEQA Guidelines Section 15183.5. The project’s consistency with the 2022 Scoping Plan and RTP/SCS is more closely applicable to the evaluation of impact criteria “b,” whether the project conflicts with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs. In sum, the City should ensure that the project’s GHG impacts have been adequately disclosed, analyzed, and mitigated as necessary.

B-3
B-4
B-5
District Comments on the Santa Maria Wastewater Treatment Plant Improvements Project, SP2025-0010 August 19, 2026

Page 3 ends

4. Misstatement: Page 4-17 of the Air Quality Section states: “SBCAPCD would issue a Permit to Operate (PTO) that describes how the equipment must be operated to minimize air pollution, and would ensure emissions would be less than significant.” This statement is incorrect. The issuance of a PTO ensures that a project complies with District rule requirements and applicable regulatory requirements but does not require a project to result in a less than significant impact under CEQA. If the City of Santa Maria, as the Lead Agency under CEQA, approves a project with significant effects, the District, as a Responsible Agency, must make the findings required by CEQA Guidelines Section 15091 for each significant effect of the project and shall make the findings in Section 15093 if necessary. Please revise the discussion to remove or correct the referenced statement.

Lastly, the applicant is advised of the following regulatory requirements or analysis regarding the District permitting process:

5. Permitting Applicability: Prior to the construction, installation or use of the operations or equipment subject to District permitting requirements, rules, and regulations, the applicant will be required to obtain an Authority to Construction (ATC) permit from the District. Proof of receipt of the required ATC permit shall be submitted by the applicant to planning staff prior to building/grading permit issuance. After issuance of the initial ATC permit, the proposed project will be required to obtain a Permit to Operate (PTO) permit from the District for the ongoing operation/use of the regulated equipment following a Source Compliance Demonstration Period, as applicable. The following equipment will require District permits: anaerobic digesters, digester gas flare(s), cogeneration unit, biogas cleanup systems, and any new hydrogen sulfide (H₂S) control equipment, such as ferrous chloride injection systems. The following equipment will be evaluated to determine permitting applicability: boilers (dependent on fuel type and stacking configuration), and dewatering and sludge storage operations. All aerobic treatment equipment is exempt from permitting pursuant to District Rule 202, Section L.11.

6. Permit Timing and Coordination: To support an efficient permitting process and streamline CEQA documentation requirements, once project design parameters have been identified, the City is encouraged to submit Authority to Construct permit application(s) to the District at the earliest opportunity, ideally concurrent with the City’s environmental review/Master Plan approval process. Early coordination can ensure that emissions from stationary equipment and operations, as well as potential health risks, are adequately evaluated and appropriately reflected in the City’s final CEQA document. All required permit application materials can be downloaded at www.ourair.org/permit-applications.

7. Best Available Control Technology: During completeness review of the District permit application, the District will evaluate the emissions from the proposed project to determine which New Source Review requirements will apply. The project as proposed may have the potential to trigger the District’s threshold for requiring implementation of Best Available Control Technology (BACT). If BACT requirements are triggered, the applicant must propose emission controls that represent BACT for their processes. The applicant should refer to the District’s webpage www.ourair.org/bact for more information on BACT requirements.

B-6
B-7
B-8
B-9
District Comments on the Santa Maria Wastewater Treatment Plant Improvements Project, SP2025-0010 August 19, 2026

Page 4 ends

8. Health Risk Assessment: As part of the District’s permit issuance process, the proposed project will require an evaluation of health risk to ensure that project-related equipment will not result in a significant impact. The City is advised to coordinate with the District to ensure that health risk assessment (HRA) requirements are properly addressed. As noted in comment #6, if feasible a concurrent District permit application submittal will facilitate the timely completion of an HRA that can be utilized for both permitting and CEQA purposes. Please refer to the District’s webpage www.ourair.org/air-toxics-for-business for general information on HRAs and contact the District’s Toxics Group at [email protected].

If you or the project applicant have any questions regarding these comments, please feel free to contact me at (805) 979-8334 or via email at [email protected].

Sincerely,
Emily Waddington,
Air Quality Specialist
Planning Division
cc: David Harris, Manager, District Engineering Division [email only] William Sarraf, Supervisor, District Engineering Division [email only] Planning Chron File
Permitted Sources File SSID 02077
B-10
9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 11

LETTER B
Santa Barbara County Air Pollution Control District, Emily Waddington, Air Quality Specialist August 19, 2026
Response B-1 This comment is introductory, provides a summary of the proposed project, and does not address the adequacy of the information or analysis in the IS/MND. Therefore, no further response is required.

Response B-2 This comment states that the proposed project includes equipment and operations subject to Air Pollution Control District of Santa Barbara County (APCD) permit requirements and prohibitory rules; therefore, APCD will be a Responsible Agency under CEQA and the APCD will seek to rely on the City’s CEQA determination when evaluating APCD permits. This comment further recommends that the CEQA document include the air pollutant emissions for all proposed equipment and operations, adequately analyze all potential air quality impacts and include mitigation as appropriate to reduce the impacts. However, this comment does not provide specific comments related to the adequacy of the analysis provided in the IS/MND.

As noted in Table 2.E on page 2-18 of the IS/MND, the APCD is a designated Responsible Agency for the proposed project, and the City of Santa Maria will work with the APCD to amend or obtain any applicable air quality permits, as required.

Potential air quality emissions associated with operation of the proposed project are disclosed in Section 4.3, Air Quality. As described on page 4-16 of the Draft IS/MND, the proposed project would include the installation of various mechanical and electrical equipment, including pumps, blowers, and mixers, which would operate up to 24 hours per day. The equipment included in CalEEMod was based on an equipment list provided by the project team (Appendix D of the IS/MND). In addition, the proposed project would require two new boilers with a rating of 2 million British thermal units per hour, which was included in the California Emissions Estimator Model (CalEEMod). Where project-specific data were not available, default assumptions from CalEEMod were used to estimate project emissions.

Model results are shown in Table 4.B on page 4-17 of the Draft IS/MND. As shown in Table 4.B, long-term operational emissions associated with the proposed project would be minimal and would be well below APCD significance thresholds for criteria air pollutants. See Responses B-3 through B-6 for responses to specific comments provided on the analysis included in the IS/MND.

With the revisions and clarifications provided in this Response to Comments Memorandum, the City of Santa Maria has determined that the 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 12 environmental analysis as presented in the IS/MND is sufficient and satisfies the requirements of CEQA. Further, the IS/MND provides an adequate level of information to allow the decision-makers, including potential Responsible Agencies, to consider the potential physical changes to the environment associated with the project and make a determination of whether to approve the proposed project. In accordance with CEQA requirements, the City of Santa Maria will provide these written responses to the commenters at least 10 days prior to adoption of the Final IS/MND. Any public hearing(s) related to the proposed project will also be publicly noticed in accordance with California’s public noticing requirements.

Response B-3 The comment expresses concern that the analysis in the IS/MND does not adequately evaluate emissions from stationary source equipment and requests that the IS/MND include fugitive and combustion-related emissions. The comment further claims that the IS/MND’s use of CalEEMod to assess the project’s operational emissions is insufficient, and requests that “off-model” emission calculations be prepared. The comment provides a list of sources which the APCD recommends be quantified and evaluated in the IS/MND. Potential air quality emissions associated with operation of the proposed project are disclosed in Section 4.3, Air Quality using CalEEMod.

CalEEMod is the standardized, statewide land use emissions computer model developed by the California Air Pollution Control Officers Association (CAPCOA) in collaboration with California air districts. It serves as the standard tool for quantifying potential criteria air pollutant and greenhouse gas (GHG) emissions associated with land use development projects under CEQA and local air district review. Specific inputs to CalEEMod are described on page 4-16 of the Draft IS/MND. As described on page 4-16 of the Draft IS/MND, the proposed project would include the installation of various mechanical and electrical equipment, including pumps, blowers, and mixers, which would operate up to 24 hours per day. The equipment included in CalEEMod was based on an equipment list provided by the project team (Appendix D of the IS/MND). In addition, the proposed project would require two new boilers with a rating of 2 million British thermal units per hour, which was included in the California Emissions Estimator Model (CalEEMod). Where project-specific data were not available, default assumptions from CalEEMod were used to estimate project emissions. As such, CalEEMod included project-specific information as available to evaluate potential criteria pollutant and GHG emissions associated with the proposed project, consistent with industry standards. As the design of the project progresses and additional information is available on the actual equipment to be used, the City of Santa Maria will work with APCD as the Responsible Agency to amend or obtain any applicable air quality permits, as required.
9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 13 Response B-4 This comment requests that the CalEEMod analysis in the IS/MND be updated to model project-specific energy and water usage amounts, rather than default rates for “General Light Industry.”
The CalEEMod analysis included in the IS/MND used the “General Light Industry” land use as the closest available land use type. Project-specific energy and water usage amounts are not yet available; therefore, default assumptions in CalEEMod were used. Although the CalEEMod model allows the user to change the default values, CalEEMod uses widely accepted methodologies for estimating emissions combined with default data that can be used when site-specific information is not available. Sources of these methodologies and default data include the United States Environmental Protection Agency’s AP-42 emission factors, California Air Resources Board’s (CARB) vehicle emission models, and studies commissioned by California agencies such as the California Energy Commission and California Department of Resources Recycling and Recovery (CalRecycle). In addition, some local air districts provided customized values to support defaults and calculations for projects located in their jurisdictions. Further, when defaults are changed in the model, the user is required to provide justification for all changes made to the default settings (e.g., reference more appropriate data sources) in the Justification box. As such, since project-specific energy and water usage amounts are not yet available, use of model defaults is appropriate. No changes to the IS/MND are required.

Response B-5 This comment questions whether the project’s GHG impacts have been adequately disclosed, analyzed, and mitigated as necessary. Specifically, this comment asserts that consistency with the 2022 CARB Scoping Plan and the Santa Barbara County Association of Governments (SBCAG) Connected 2050 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) described in the IS/MND does not adequately address impact criteria “a” for Greenhouse Gas Emissions and that neither of these plans meet the definition of a qualified GHG reduction plan consistent with Section 15183.5 of the State CEQA Guidelines.

Section 15064.4 of the State CEQA Guidelines states: “A lead agency shall make a good-faith effort, based to the extent possible on scientific and factual data, to describe, calculate or estimate the amount of greenhouse gas emissions resulting from a project.” In performing that analysis, the lead agency has discretion to determine whether to use a model or methodology to quantify GHG emissions, or to rely on a qualitative analysis or performance-based standards. In making a determination as to the significance of potential impacts, the lead agency then considers the extent to which the project may increase or reduce GHG emissions compared to the existing environmental setting, whether the project emissions exceed a threshold of significance that the lead agency determines applies to the 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 14 project, and the extent to which the project complies with regulations or requirements adopted to implement a statewide, regional, or local plan for the reduction or mitigation of GHG emissions.

As discussed on page 4-47 of the IS/MND, the City of Santa Maria has not adopted a GHG reduction plan or qualified Climate Action Plan. While no numeric thresholds are currently adopted by the APCD, the CARB Statewide targets and the State CEQA Guidelines establish a framework for evaluating a project’s GHG impacts. As such, in the absence of an established GHG threshold, the City as lead agency has determined that consistency with Statewide GHG reduction goals applies to the proposed project. Therefore, the GHG analysis contained in the IS/MND evaluates the proposed project for consistency with applicable statewide reduction goals as the applicable thresholds of significance to establish whether the proposed project is achieving its “fair share” of emission reductions to support long-term State goals for GHG emissions and carbon neutrality.

The proposed project’s consistency with applicable Statewide reduction goals, including consistency with the 2022 CARB Scoping Plan and the RTP/SCS is included on pages 4-49 through 4-53 of the IS/MND. As demonstrated on pages 4-49 through 4-53 of the IS/MND, the proposed project would be consistent with the goals of the 2022 Scoping Plan and the SBCAG 2050 RTP/SCS. As such, operation of the proposed project would not generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment. Impacts would be less than significant and no change to the IS/MND is required.

Response B-6 This comment claims that the IS/MND contains a mis-statement that “SBCAPCD would issue a Permit to Operate (PTO) that describes how the equipment must be operated to minimize air pollution, and would ensure emissions would be less than significant”, stating that issuance of a PTO would not require a project to result in a less than significant impact under CEQA, and requests the statement be removed or revised.

As shown in Table 4.B of the IS/MND, long-term operational emissions associated with the proposed project would be minimal and would be well below APCD significance thresholds for criteria air pollutants. Further, as discussed on page 4-17 of the IS/MND, the proposed project would include a Cogeneration Facility with battery, digester gas flares, and sludge withdrawal within the WWTP boundary. Currently, the WWTP generates digester gas, which is flared under an existing SBAPCD permit. The Cogeneration Facility would also include installation of a battery to reduce the purchase of utility power during peak periods. The cogeneration engines would include emissions control equipment as needed to comply with the APCD requirements. It is assumed that the emission control equipment would remove hydrogen sulfide (H2S) and reactive organic compounds 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 15 (ROCs) from the digester gas to enhance the reliability of the cogeneration units. The cleaned biogas would then be piped to the cogeneration engine.

The Cogeneration Facility would be designed and operated to use as much digester gas as possible.

As stated on page 4-17, all stationary sources associated with the proposed project would be required to obtain an Authority to Construct (ATC) permit prior to installation. As part of the ATC, the APCD would evaluate the proposed sources for consistency with local, State, and federal air pollution control requirements. If proposed sources are found to be consistent with requirements, prior to operation, APCD would issue a PTO that describes how the equipment must be operated to minimize air pollution.

Further, as discussed on page 4-17 of the IS/MND, since the proposed project’s long-term operational emissions shown in Table 4.B would be well below the APCD significance thresholds for criteria air pollutants, operation of the proposed project would not result in a cumulatively considerable net increase of any criteria pollutant for which the proposed project region is in non-attainment under an applicable federal or State ambient air quality standard. As a result, impacts would be less than significant. Issuance of a PTO would be required as part of the project but would not be required to reduce emissions to a less-than-significant level.

Response B-7 This comment provides a summary of the APCD’s permitting requirements, including the ATC permit, which is required prior to building/grading permit issuance and the PTO, which is required for the ongoing operation/use of the regulated equipment. This comment is acknowledged. As noted in Table

2.E, on page 2-18 of the IS/MND, the APCD is a designated Responsible Agency for the proposed project, and the City of Santa Maria will work with the APCD to amend or obtain any applicable air quality permits, as required.

In response to this comment, Table 2.E on page 2-18 of the IS/MND has been revised as follows:

Table 2.E: Potential Permits and Approvals
Lead Agency Potential Permits/Approvals
City of Santa Maria • Environmental Review
• Project Approval
• Building Permit
Other Agencies
Regional Water Quality Control Board • Waste Discharge Permit Santa Barbara County Air Pollution Control District • Authority to Construct • Permit to Operate
State Water Resources Control Board • Construction General Permit • Industrial General Permit
9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 16 Table 2.E: Potential Permits and Approvals
Lead Agency Potential Permits/Approvals
Santa Barbara County Environmental Health Services
certified by the California Environmental Protection Agency as the Certified Unified Program Agency (CUPA)
• Unified Program Facility Permit
State of California Department of Industrial Relations
Division of Occupational Safety & Health
• Permit to Operate
Source: Compiled by LSA (2025).

The revisions identified above represent a minor change to the IS/MND in order to clarify the IS/MND analysis. As described below, because the pumps are electric powered, this clarification in the number of pumps does not change the results of the air quality analysis as the electric-powered pumps do not generate air quality emissions and were not included in the air quality modeling. Therefore, these revisions do not change the conclusions or analysis of impacts in the IS/MND necessitating recirculation of the IS/MND.

Response B-8 This comment provides regulatory requirements, including permit timing and coordination. The comment suggests that the City submit permit applications at the earliest opportunity. As indicated in Response B-7, the City of Santa Maria will work with the APCD to amend or obtain any applicable air quality permits, as required. No change to the IS/MND is required.

Response B-9 This comment indicates that the proposed project may have the potential to trigger ACPD’s threshold for requiring implementation of APCD’s Best Available Control Technology (BACT) requirements. If BACT requirements are triggered, the applicant must propose emission controls that represent BACT for their processes. This comment is acknowledged. As indicated in Response B-7, the City of Santa Maria will work with the APCD to amend or obtain any applicable air quality permits as required and comply with any permit condition, including implementation of BACT. No change to the IS/MND is required.

Response B-10 This comment states that the proposed project would require an evaluation of health risk, including a health risk assessment, as applicable, during the APCD’s permit issuance process. This comment is acknowledged.

As described on pages 4-17 and 4-18 of the IS/MND, the closest sensitive receptors include a single-family residence approximately 265 feet northeast of the project site boundary across Black Road. Construction of the proposed project may expose surrounding sensitive receptors to airborne particulates as well as a small quantity of construction equipment pollutants (e.g., usually diesel-fueled vehicles and equipment). However, construction 9/25/26 (P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\RTC\SantaMariaWWTP_RTC.docx) 17 contractors would be required to implement Mitigation Measure AIR-1.

With implementation of Mitigation Measure AIR-1, project construction pollutant emissions would not be a source of substantial emissions. Once the project is constructed, operational activities associated with the proposed project would not be a source of substantial emissions due to the distance to the nearest sensitive receptors and since the proposed project’s long-term operational emissions would be well below the SBCAPCD’s thresholds. Therefore, sensitive receptors are not expected to be exposed to substantial pollutant concentrations during project construction or operation, and with implementation of Mitigation Measure AIR-1, potential impacts associated with project construction would be considered less than significant. No change to the IS/MND is required.

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26)

APPENDIX F

MITIGATION MONITORING AND REPORTING PROGRAM

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

INITIAL S TUDY C HECKLIST
S EPTEMBER 2026
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\Final Draft\SantaMariaWWTP_ISMND.docx (09/25/26) This page intentionally left blank

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ATNA MARIA , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 1

MITIGATION MONITORING AND REPORTING PROGRAM
This Mitigation Monitoring and Reporting Program (MMRP) is formulated based upon the findings of the Initial Study/Mitigated Negative Declaration (IS/MND) prepared for the Santa Maria Wastewater Treatment Plant (WWTP) Improvements Project (project). The MMRP, which is found in Table A, lists mitigation measures recommended in the IS/MND and identifies mitigation monitoring requirements.

This MMRP has been prepared to comply with the requirements of State law (Public Resources Code Section 21081.6). State law requires the Lead Agency to adopt an MMRP when mitigation measures are required to avoid significant impacts. The MMRP is intended to ensure compliance with the mitigation measures identified in the IS/MND during implementation of the project.

The MMRP is organized in a matrix format. The first column identifies the recommended mitigation measures. The second column, entitled Implementation Actions, refers to the actions taken by the party responsible for implementing the mitigation measure. The third column, entitled Timing Requirements, refers to when the monitoring will occur and when the mitigating action must be completed. The fourth column, entitled Monitoring/Reporting Responsibility refers to the party responsible for seeing to it that the mitigation measure is implemented. The fifth column, entitled Verified By and Date, refers to the party and date the action was verified as complete.

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
2 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) This page intentionally left blank

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

RICHMOND , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 3 Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date

AIR QUALITY
Mitigation Measure AIR-1: During construction, the project contractor shall implement the following Santa Barbara County Air Pollution Control District (SBCAPCD) standard dust control and equipment exhaust measures:
 Water trucks or sprinkler systems shall be used to keep all areas of vehicle movement damp enough to prevent dust from leaving the site. At a minimum, this should include wetting down such areas in the late morning and after work is completed for the day. Increased watering frequency should be required whenever the wind speed exceeds 15 miles per hour (mph). Reclaimed water should be used whenever possible. However, reclaimed water should not be used in or around crops for human
consumption.
 On site vehicle speeds shall be no greater than 15 miles per hour when traveling on unpaved surfaces.
 A track-out prevention device shall be installed and operated where vehicles enter and exit unpaved roads onto paved streets.

The track-out prevention device can include any device or combination of devices that are effective at preventing track-out of dirt, such as gravel pads, pipe-grid track-out control devices, rumble strips, or wheel-washing systems.
 If importation, exportation and stockpiling of fill material is involved, soil stockpiled for more than 2 days shall be covered, kept moist, or treated with soil binders to prevent dust generation. Trucks transporting fill material to and from the site shall be tarped from the point of origin.
 The amount of disturbed area shall be minimized. After clearing, grading, earthmoving, or excavation is completed, the disturbed area shall be treated by watering, roll compaction, revegetating, or spreading soil binders until the area is paved or otherwise developed so that dust generation will not occur. All roadways,  Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Throughout the
construction period.
 The City of Santa Maria
(City) is responsible for
incorporating this
measure into contract
specifications and
monitoring compliance
during construction.
 The Construction
Contractor is responsible
for implementing this
measure.

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
4 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
driveways, sidewalks, etc., to be paved should be completed as soon as possible.
 Clearing, grading, earthmoving, and excavation activities shall be scheduled during periods of low wind speed to the extent feasible. During periods of high winds {>25 mph), clearing, grading, earthmoving, and excavation operations shall be minimized to prevent fugitive dust created by on site operations from becoming a nuisance or hazard.
 The contractor or builder shall designate a person or persons to monitor the dust control program and to order increased watering, as necessary, to prevent transport of dust off site. Their duties shall include holiday and weekend periods when work may not be in progress. The name and telephone number of such persons shall be provided to the Santa Barbara County Air Pollution Control District {SBCAPCD) prior to grading/ building permit issuance and/or map clearance.
 All portable diesel-powered construction equipment shall be registered with the State's portable equipment registration program or shall obtain an SBCAPCD permit.
 Fleet owners of mobile construction equipment are subject to the California Air Resource Board (CARB) Regulation for In-Use Off-Road Diesel Vehicles (Title 13, California Code of Regulations [CCR] §2449), the purpose of which is to reduce nitrogen oxides (NOx), diesel particulate matter (DPM), and other criteria pollutant emissions from in-use (off-road) diesel-fueled vehicles.

Off-road heavy-duty trucks shall comply with the State Off-Road Regulation. For more information, see
https://ww2.arb.ca.gov/our work/programs/use-road-diesel-fueled-fleets-regulation.  Fleet owners of mobile construction equipment are subject to the CARB Regulation for In-Use (On-Road) Heavy-Duty Diesel-Fueled Vehicles {13 CCR §2025), the purpose of which is to

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

RICHMOND , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 5 Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
reduce DPM, NOx, and other criteria pollutants from in-use (on-road) diesel-fueled vehicles. On-road heavy duty trucks shall comply with the State On-Road Regulation.
 All commercial off-road and on-road diesel vehicles are subject, respectively, to 13 CCR §2449{d){3) and §2485, limiting engine idling time. Idling of heavy-duty diesel construction equipment and trucks during loading and unloading shall be limited to 5 minutes; electric auxiliary power units should be used whenever possible.

BIOLOGICAL RESOURCES
Mitigation Measure BIO-1: Worker Environmental Awareness Program (WEAP). Prior to any ground disturbance or construction activities, a qualified biologist shall conduct a training session for all construction personnel. The training shall include a description of the western burrowing owl, tricolored blackbird, and yellow warbler and their habitats. The training shall also discuss the project mitigation measures described herein, including Mitigation Measure B1O-2, Mitigation Measure B1O-3, Mitigation Measure B1O-6, Mitigation Measure B1O-7, and Mitigation Measure B1O-8.

Following the training, all construction personnel receiving the training shall sign a WEAP log to document their training. The WEAP training shall be repeated periodically as needed throughout construction so that all construction personnel are trained prior to starting work.
 Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Prior to any ground
disturbance or
construction activities.
 The City is responsible for
incorporating this
measure into contract
specifications, hiring a
qualified biologist, and
for confirming
compliance prior to and
during construction.
 A qualified biologist is
responsible for
conducting training
sessions for all
construction personnel.
 The Construction
Contractor is responsible
for having all construction
personnel attend training
and sign WEAP
document.

Mitigation Measure BIO-2: Project Site Delineation. Prior to the start of construction, the contractor shall clearly delineate the work areas (e.g., t-posts and 0.25-inch yellow nylon rope and temporary  Incorporate
measure into
Prior to the
Construction period.
 The City is responsible for
incorporating this
measure into contract

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
6 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
signage) in or adjacent to sensitive biological areas to provide clear limits to the extent of the work area. A qualified biologist shall confirm that the work areas are clearly delineated prior to work. contract
specifications.
 Implementation
actions are
outlined in the
measure.
specifications, hiring a
qualified biologist, and
confirming compliance
prior to and during
project construction.
 A qualified biologist is
responsible for clearly
delineating project limits.
 The Construction
Contractor is responsible
for having all construction
personnel abide by
project limits.

Mitigation Measure BIO-3: Additional Construction Site
Housekeeping and Operational Requirements. The following measures will be implemented to avoid or minimize impacts on special-status species:
 No monofilament plastic (e.g., straw roll netting) shall be used for erosion control.
 All food-related trash items such as wrappers, cans, bottles, and food scraps shall be disposed of in securely closed containers and removed at least once a week from a construction or project site.  Pets, such as dogs or cats, shall not be permitted on the project site.
 Use of rodenticides and herbicides in project site shall be restricted. This is necessary to prevent primary or secondary poisoning of native predators (e.g., western burrowing owl) and the depletion of prey populations on which they depend. All uses of such compounds shall observe label and other restrictions mandated by the U.S. Environmental Protection Agency,
California Department of Food and Agriculture, and other State  Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Prior to and during
construction activities
 The City is responsible for
incorporating this
measure into contract
specifications and
confirming compliance
prior to and during
construction activities.
 The Construction
Contractor is responsible
for adhering to site
housekeeping and
operational requirements
throughout the
construction period.

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

RICHMOND , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 7 Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
and federal legislation. If rodent control must be conducted, zinc phosphide shall be used.
 Any nonnative plants removed during construction shall be contained and properly disposed of offsite.
 Any nonnative plants removed during construction shall be contained and properly disposed of offsite.
 No plant species listed on the California Invasive Plant Council (Cal-I PC) inventory shall be installed in the project site, and all plant palettes proposed to be installed on the project site(s) shall be reviewed and approved by a qualified biologist.

Mitigation Measure BIO-4: Tricolored Blackbird Preconstruction Survey and Avoidance Measures. If the initiation of construction or vegetation clearing would occur during the breeding season (February 1-September 15), a qualified biologist shall conduct preconstruction surveys for nesting tricolored blackbirds within 10 days prior to the initiation of construction activities or any vegetation clearing to evaluate the presence or absence of tricolored blackbird nesting colonies within 300 feet of project activities.

If an active tricolored blackbird nesting colony is found during preconstruction surveys, an initial minimum 300-foot no disturbance buffer shall be established by the biologist in accordance with the CDFW (2015) Staff Guidance Regarding Avoidance of Impacts to Tricolored Blackbird Breeding Colonies on Agriculture Fields in 2015. If the qualified biologist, in coordination with CDFW, determines that the 300-foot setback can be reduced, construction activities in the vicinity of the nest shall be monitored by the qualified biologist to verify that construction activities within the reduced setback are not adversely affecting nesting tricolored blackbirds. If it is determined that nesting is not affected by construction activities with the reduced setback area, work can proceed. If it is determined that construction activities are adversely  Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Prior to and during
construction activities
 The City is responsible for
incorporating this
measure into contract
specifications, hiring a
qualified biologist,
reviewing survey results,
precluding work from
occurring during the
breeding season, if
possible, and ensuring
buffers are established
and maintained, if
needed.
 A qualified biologist is
responsible for
conducting
preconstruction surveys
and establishing buffers
as necessary.
 The Construction
Contractor is responsible

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
8 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
affecting nesting tricolored blackbirds with the reduced setback, all construction within 300 feet of a nest shall be halted until the biologist, in coordination with CDFW, can establish an appropriate setback.

This buffer shall remain in place until the breeding season has ended or until a qualified biologist has determined that nesting has ended, the birds have fledged, and the birds are no longer reliant upon the colony or parental care for survival. It is important to note that tricolored blackbird colonies can expand over time; for this reason, the colony should be reassessed to determine the extent of the breeding colony within 10 days of project initiation.
for keeping work out of
any established buffers.

Mitigation Measure BIO-5: Western Burrowing Owl
Preconstruction Clearance Surveys. Preconstruction surveys following the protocol described in the CDFW (2012) Staff Report on Burrowing Owl Mitigation shall be conducted at least 14 days prior to construction but within 30 days prior to construction. If burrowing owls are identified on the project site, or immediately adjacent, an initial minimum 250-foot no disturbance buffer zone shall be established by the biologist around any occupied burrow.

The sizes of individual buffers may be modified through coordination with the CDFW based on site-specific conditions and existing disturbance levels. No work shall occur within the no-disturbance buffer during the nesting season (February 1 through August 31) unless a qualified biologist approved by the CDFW determines that the burrow is no longer active by verifying through non-invasive methods that (1) the burrow is no longer being actively used; or (2) juveniles from the occupied burrows are foraging independently and are capable of independent survival.

If an occupied western burrowing owl burrow is located within the impact area, and it cannot be avoided, the City of Santa Maria shall provide compensatory mitigation at a minimum 1:1 ratio (i.e., one acre of mitigation for each acre impacted) to obtain an Incidental Take Permit, pursuant to California Fish and Game Code Section 2081(b). Compensatory mitigation may include, but would not be  Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Prior to and during
construction activities
 The City is responsible for
incorporating this
measure into contract
specifications, hiring a
qualified biologist.
reviewing survey results,
requiring that work
avoids burrows, if
identified, and obtaining
any necessary
compensatory mitigation,
if needed.
 A qualified biologist is
responsible for
conducting
preconstruction surveys
and establishing buffers
as necessary.
 The Construction
Contractor is responsible

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

RICHMOND , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 9 Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
limited to, purchase of mitigation credits from an agency-approved mitigation bank; payment to an existing in-lieu fee program; conservation of occupied habitat (including establishment of a conservation easement or similar legal protections).
for keeping work out of
established buffers.

Mitigation Measure BIO-6: Nesting Birds Preconstruction Survey and Avoidance Measures. If the initiation of construction or vegetation clearing would occur during the active nesting bird season (February 1 through September 15), a qualified biologist shall conduct a preconstruction nesting bird survey within 3 days prior to the start of the initiation of construction activities or any vegetation clearing. The nesting bird survey shall include the work area and areas within 300 feet of work areas.

For any active nest(s) identified, the qualified biologist will establish an appropriate no-disturbance buffer zone around the active nest(s). The appropriate buffer shall be determined by the qualified biologist based on species, location, and the nature of the proposed activities. No work shall occur within the no-disturbance buffer until the biologist has determined that the nest is no longer active (i.e., the nest has fledged or the nest has failed).
 Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

Prior to and during
construction activities
 The City is responsible for
incorporating this
measure into contract
specifications, hiring a
qualified biologist,
reviewing survey results,
precluding work from
occurring during the
nesting bird season, if
possible, and confirming
compliance prior to and
during construction
activities.
 A qualified biologist is
responsible for
conducting
preconstruction surveys
and establishing buffers
as necessary.
 The Construction
Contractor is responsible
for keeping work out of
established buffers.

CULTURAL RESOURCES
Mitigation Measure CUL-1: Inadvertent Discovery of
Archaeological Resources. If previously undiscovered cultural resources (such as stone, bone, glass, ceramic, wood, or shell artifacts; fossils; hearths; structural remains; or historic dumpsites) are encountered during excavation or grading, all ground-disturbing  Incorporate
measure into
contract
specifications.

During ground-disturbing activities. The City is responsible for incorporating this
measure into contract
specifications, hiring a
qualified archaeologist,

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
10 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
work within 50 feet of the discovery shall cease immediately, and the City of Santa Maria (City) shall be notified. A qualified archaeologist, in consultation with locally affiliated Native American representatives, as appropriate, shall evaluate the discovery. If the resource is found to be potentially significant under the California Environmental Quality Act (CEQA), it shall be formally documented using California Department of Parks and Recreation (DPR) 523 forms. If the Project Archaeologist finds the deposit to be potentially significant (i.e., potentially eligible for listing in the California Register of Historical Resources), the City shall be responsible for funding and implementing appropriate mitigation measures.

Mitigation measures may include recording the archaeological deposit, data recovery and analysis, and public outreach regarding the scientific and cultural importance of the discovery. Upon completion of the selected mitigations, the Project Archaeologist shall prepare a report documenting methods, findings, and recommendations; shall submit the report to the City for review; and shall submit the final report to the Central Coast Information Center at the University of California, Santa Barbara. Recovered archaeological materials shall be submitted to an appropriate local curation facility and may be used for future research and public interpretive displays, as appropriate.
 Implementation
actions are
outlined in the
measure.
and for confirming
compliance during
construction.
 The qualified
archaeologist is
responsible for assessing
potential discoveries and
determining the
appropriate mitigation.
 The Construction
Contractor is responsible
for cooperating with the
qualified archaeologist if
resources are discovered.

Mitigation Measure CUL-2: Inadvertent Discovery of Human Remains. In the event that human remains are encountered at any time during project work, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to California Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be Native American, the County Coroner would notify the Native American Heritage Commission (NAHC) within 24 hours, which would determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection and make  Incorporate
measure into
contract
specifications.
 Implementation
actions are
outlined in the
measure.

During ground-disturbing activities. The City is responsible for incorporating this
measure into contract
specifications, contacting
the County Coroner and
for confirming
compliance during
construction.
 The Construction
Contractor is responsible
for stopping work and
contacting the City.

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

RICHMOND , C ALIFORNIA
P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) 11 Table A: Mitigation Monitoring and Reporting Program
Mitigation Measure
Implementation
Actions
Timing
Requirements
Monitoring/Reporting
Responsibility Verified By and Date
recommendations or preferences for treatment within 48 hours of being granted access to the site. The MLD's recommendations may include scientific removal and nondestructive analysis of human remains and items associated with Native American burials, preservation of Native American human remains and associated items in place, relinquishment of Native American human remains and associated items to the descendants for treatment, or any other culturally appropriate treatment.
 The qualified
archaeologist is
responsible for examining
the find and making
recommendations.
 The MLD is responsible
for reviewing the report
and making
recommendations
regarding reburial.

TRIBAL CULTURAL RESOURCES
Refer to Mitigation Measures CUL-1 and CUL-2 as described above.

Source: LSA (2026).

S ANTA MARIA WWTP I MPROVEMENTS P ROJECT

S ANTA MARIA , C ALIFORNIA

MITIGATION MONITORING AND REPORTING P ROGRAM
S EPTEMBER 2026
12 P:\2024\20241463 CPZ Santa Maria WWTP\PRODUCTS\Initial Study\MMRP\Santa Maria WWTP_MMRP.docx (09/25/26) This page intentionally left blank