PILOT TEST REPORT
TEST LOCATION: SANTA MARIA WWTF
PILOT TEST FOR: BIOSOLIDS DEWATERING TRIAL
PILOT TEST DATE: SEPTEMBER 08 – SEPTEMBER 12, 2025
ISHIGAKI USA LTD.
280 HERITAGE AVE. UNIT #J
PORTSMOUTH, NH 03801
Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 2 of 12 ends

TABLE OF CONTENTS

1. Ishigaki’s Mobile Testing System Summary ........................................................................ 3

2. Facility Details..................................................................................................................... 3

3. Tested Treatment Process.................................................................................................. 4

4. Current Wastewater Treatment Details ............................................................................... 5

5. Polymer Jar Testing Results ............................................................................................... 5

6. Pilot Test Goals................................................................................................................... 5

7. Methods to Achieve Pilot Test Goals................................................................................... 6

8. Detailed Sludge Characteristics .......................................................................................... 6

9. Results................................................................................................................................ 7 a) Summary Plot ............................................................................................................ 7 b) Table.......................................................................................................................... 9

10. Observations and Conclusions...........................................................................................10

11. Test Pictures......................................................................................................................11 Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 3 of 12 ends

1. ISHIGAKI’S MOBILE TESTING SYSTEM SUMMARY
The Ishigaki Mobile Pilot Testing System is a self-contained screw press dewatering system, which can typically test 5 – 17 gallons per min and up to 150 pounds of dry solids per hour.

The mobile testing system is specifically designed for on-site evaluation to accurately determine the dewatering performance of a particular slurry, as well as appropriate sizing for a particular application. The system includes Ishigaki’s ISGK-A-0305 dewatering screw press, NETZCH progressive cavity sludge pump, Velodyne Liquid Polymer Blending Unit, Endress+Hauser Magnetic flow meter, Ishigaki’s Conditioning Tank, control panel, and 3 polymer injection points. Additionally, there are specific ports within the system to monitor the slurry condition.

2. FACILITY DETAILS
Facility: City of Santa Maria WWTF
Location: 601 Black Rd.

Santa Maria, CA 93458
Project Summary: Biosolids Facility Upgrade
Facility Contact Name: Russ Newman
Facility Contact Position: Wastewater Supervisor
Facility Contact Email: [email protected]
Facility Contact Phone: (805) 266-1617
Performed by: Ishigaki USA Ltd.

Test Lead: Nicholas Hall, Ishigaki USA Ltd.

Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 4 of 12 ends

3. TESTED TREATMENT PROCESS
Trickling
Filters
Additional
Treatment
Anaerobic
Digesters
Primary
Influent Clarifiers
Sludge
Drying Beds
Screens
Grit
Removal

= Raw Sludge Sample Location
Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 5 of 12 ends

4. CURRENT WASTEWATER TREATMENT DETAILS
Sludge Type: Anaerobically Digested Sludge
Thickening Method: Gravity, in digester
Facility Daily Flow (MGD): ~7.5 MGD influent per 2024 Plant Flow Schematic Volatile Solids (%): 69.55% (Average from Lab Data)
Sludge Solids Content (%): 2.2% (Average during testing) Dewatering Equipment: Natural Effects; Sludge Drying Beds Polymer Type: C-6285/FB-808
Current Dewatered Cake Solids As needed / as natural effects allow Requested for testing: ~20% Total Solids or better

5. POLYMER JAR TESTING RESULTS
Prior to the pilot testing, Ishigaki USA Ltd. jar tested multiple polymers to determine which created the most effective flocs with the feed sludge. Jar testing indicated that the Clarifloc C-6285 was the most effective polymer for this application.

6. PILOT TEST GOALS
1) To demonstrate the operational and performance benefits of the Ishigaki Screw Press for this application.
2) To provide relevant data used to scale up this specific Ishigaki Screw Press to a full-size design for this application.
3) To verify that the Ishigaki Screw Press technology, in this application, is capable of adequately dewatering the test sludge.

Pilot Test Report Santa Maria WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 6 of 12 ends

7. METHODS TO ACHIEVE PILOT TEST GOALS
The press was operated with the objective of minimizing polymer dosage and maximizing throughput, cake solids dryness and solids capture efficiency. Optimization occurred by varying sludge feed rate, polymer feed rate, and screw speed. Based on those objectives, the most important testing parameters were determined to be:
1) Feed sludge concentration (% DS)
2) Flow rate of feed sludge (GPM)
3) Active polymer dosage (lbs / ton DS)
4) Cake solids concentration (% DS)
5) Solids loading capacity (lbs DS/hr)
6) Solids capture Efficiency
The optimal choice of polymer(s) is discussed in section 5, “Polymer Jar Testing Results.” For your reference, a schematic of the system can be seen below.

8. DETAILED SLUDGE CHARACTERISTICS
Date TS% TVS%
09/9/2025 2.2% ~70*%
* Based on cake solids volatile data.

Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 7 of 12 ends

9. RESULTS
a) Summary Plot
0%
10%
20%
30%
40%
50%
60%
70%
80%
0 5
10 15
20 25
30 35
40 0 2 4 6 8 10 12 14
Screw Speed (% of 60 Hz)
Cake Solids (% DS)
Polymer Dosage (lbs Active / Ton DS)
Hydraulic Loading (GPM)
Test Number
Summary (Field Data)
Polymer Dosage Hydraulic Loading Screw Speed Cake Solids

22.0%

24.0%

26.0%

28.0%

30.0%

32.0%

34.0%
20 22 24 26 28 30 32 34 36
CAKE SOLIDS (%)

POLYMER DOSAGE (LBS ACTIVE / DT)
CAKE SOLIDS VS. POLYMER DOSAGE
Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 8 of 12 ends

0.0 10.0

20.0 30.0

40.0 50.0

60.0 70.0

80.0 90.0

0.150 0.200 0.250 0.300 0.350 0.400

SOLIDS LOADING (LBS DS / HR)

SPEED SCREW PRESS (RPM)
SOLIDS LOADING VS. SCREW SPEED

20.0%

22.0%

24.0%

26.0%

28.0%

30.0%

32.0%

34.0%

0.150 0.200 0.250 0.300 0.350 0.400
CAKE SOLIDS (%)

SPEED SCREW PRESS (RPM)
CAKE SOLIDS VS. SCREW SPEED
Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 9 of 12 ends

b) Table

Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 10 of 12 ends

10.OBSERVATIONS AND CONCLUSIONS
• Operational and performance benefits were demonstrated to key staff members during this plant’s specific application.
• Relevant data was acquired during the pilot test. This data will be analyzed by Ishigaki’s leading team of design engineers to properly scale up the pilot unit to a full-size unit for your operation.
• The pilot test proved the advanced technology of the ISGK-A screw press technology would be an excellent choice to successfully dewater this slurry. o Polymer dosage ranged from 22 – 35 lbs. active / ton DS. Polymer dosage throughout the entire range resulted in good performance. o Cake solids concentration throughout the pilot test ranged from 23.9 to 33.5% throughout the testing, averaging 27.9%. Screw speed (throughput) and polymer dosage effected cake solids as anticipated.
o Solids feed capacity in this ISGK-A-0305 unit, specifically sized for pilot testing, ranged from 41.8 – 77.1 lbs DS / hr.
o Capture efficiencies averaged 99.08% and ranged up to 99.77%.

Ishigaki USA Ltd. would like to thank you for the opportunity to present our screw press model ISGK-A-0305 at the City of Santa Maria WWTP. We appreciate all the help provided by the plant personnel to make this a successful test.

Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 11 of 12 ends

11.TEST PICTURES

1. Flocculated Sludge 2. Filtrate

Pilot Test Report
Palm Beach County WWTF
280 Heritage Ave • Portsmouth, NH 03801 • (603) 433-3334 • Fax (603) 433-3348

Page 12 of 12 ends

3. Cake Solids 4. Naturally Dried Cake

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 9: Energy Management
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 9: Energy Management
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:22:15-07'00'
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 9/Ch01 Contents
CHAPTER 1 ENERGY MANAGEMENT

1.1 Introduction 1-1

1.2 Data Gathering 1-2

1.2.1 Current Electrical Demand and Charges 1-2

1.2.2 Projected Electrical and Heating Demand for New/Modified WWTP 1-4

1.2.3 Current and Projected Digester Gas Production 1-7

1.3 Power/Heating Generation and Management Technologies 1-9

1.3.1 Emissions Regulation 1-9

1.3.2 Gas Engines 1-9

1.3.3 Microturbines 1-10

1.3.4 Pipeline Injection 1-11

1.3.5 Boilers 1-12

1.3.6 Microgrid 1-13

1.3.7 Wind Energy 1-15

1.3.8 Fuel Cells 1-16

1.4 Site Layouts 1-17

1.5 Digester Gas Beneficial Use Alternatives 1-18

1.5.1 Alternatives Evaluation Basis 1-19

1.5.2 Alternative 1 (Base Case and Current Operation): Heat Recovery With Boilers and Flare Remaining DG 1-20

1.5.3 Alternative 2: Alternative 1 + Power Management Using Microgrid and Battery 1-23

1.5.4 Alternative 3: Power and Heat Generation Using 635 kW Gas Engine + Power Management Using Microgrid and Battery 1-27

1.5.5 Alternative 4: Power and Heat Generation Using 400 kW Microturbine + Power Management Using Microgrid and Battery 1-33

1.5.6 Alternative 5: Power and Heat Generation Using 600 kW Microturbine + Power Management Using Microgrid and Battery 1-40

1.5.7 Alternative 6: Heat Recovery With Boilers + Compression of Remaining Biogas to CNG for Pipeline Injection + Power Management Using Microgrid and Battery 1-45

1.6 Alternative Analysis 1-50

1.6.1 Conclusions and Recommendations 1-52
Appendices

APPENDIX A ELECTRICAL POWER DRAW CALCULATIONS

APPENDIX B HOMER REPORT

APPENDIX C FINANCIAL ASSUMPTIONS AND PROCESS ASSUMPTIONS VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Tables
Table 1.1 Projected Daily Demand Based on Normal Operation 1-4 Table 1.2 Projected Average Daily Demand Based on Normal Operation 1-6 Table 1.3 WWTP Expansion Anaerobic Digester Heating Requirements 1-6 Table 1.4 Average Monthly Digester Gas Production and Yield (2018-2024)(1) 1-7 Table 1.5 Phase 1 Expansion Anaerobic Digester Design Criteria 1-7 Table 1.6 Gas Engine Specifications 1-9
Table 1.7 Microturbine Specifications 1-10
Table 1.8 Boiler Specifications 1-12
Table 1.9 Case 1 - Homer Software Results - Grid and Solar Only 1-14 Table 1.10 Case 2 - Homer Software Results - Grid, Solar, and Battery 1-15 Table 1.11 Financial Incentives for DG Beneficial Use Alternatives(1) 1-20 Table 1.12 Life Cycle Analysis Criteria - Alternative 1 1-21 Table 1.13 Life Cycle Cost Analysis - Alternative 1 (Base Case) 1-23 Table 1.14 Life Cycle Analysis Criteria - Alternative 2 1-24 Table 1.15 Financial Incentives for Alternative 2 1-25
Table 1.16 Life Cycle Cost Analysis – Alternative 2 (Base Case + Boiler, Battery, and Solar) 1-26 Table 1.17 Gas Conditioning Skid Specifications 1-28
Table 1.18 Life Cycle Analysis Criteria - Alternative 3 1-29 Table 1.19 Financial Incentives for Gas Engines 1-30
Table 1.20 Life Cycle Cost Analysis - Alternative 3 (Gas Engine) 1-33 Table 1.21 Gas Conditioning Skid Specifications 1-34
Table 1.22 Life Cycle Analysis Criteria - Alternative 4 1-35 Table 1.23 Financial Incentives for Microturbines 1-36
Table 1.24 Life Cycle Cost Analysis - Alternative 4 (400 kW Microturbine) 1-39 Table 1.25 Gas Conditioning Skid Specifications 1-40
Table 1.26 Life Cycle Analysis Criteria - Alternative 5 1-41 Table 1.27 Financial Incentives for Microturbines 1-42
Table 1.28 Life Cycle Cost Analysis – Alternative 5 (600 kW Microturbine) 1-45 Table 1.29 Life Cycle Analysis Criteria - Alternative 6 1-46 Table 1.30 Financial Incentives for Pipeline Injection 1-47 Table 1.31 Life Cycle Cost Analysis - Alternative 6 (Conversion to CNG for Pipeline Injection) 1-49
Table 1.32 Alternatives Analysis 1-51
Figures
Figure 1.1 Selected Treatment Alternative for Santa Maria WWTP 1-1 Figure 1.2 WWTP Average Monthly Usage (September 2023 - August 2024) 1-2 Figure 1.3 WWTP Peak Demand by Month (September 2023 - August 2024) 1-3 Figure 1.4 WWTP Cost per Kilowatt-Hour (September 2023 - August 2024) 1-4 Figure 1.5 WWTP Projected Hourly Demand 1-5
Figure 1.6 WWTP Projected Hourly Net Demand With Solar Output 1-6 Figure 1.7 Jenbacher J312 Gas Engine 1-10
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Figure 1.8 Capstone C600S Enclosure 1-11
Figure 1.9 Proximity of WWTP to SoCalGas Pipeline 1-12
Figure 1.10 Cleaver Brooks CBJT Boiler 1-13
Figure 1.11 Example Representation of a Microgrid 1-14
Figure 1.12 Available Space for Cogeneration Alternatives 1-17 Figure 1.13 Proposed Locations of the Power Management Systems at Santa Maria WWTP 1-18
Figure 1.14 Alternative 1 - Electrical Process Schematic 1-21 Figure 1.15 Alternative 1 - Biogas Process Schematic 1-21 Figure 1.16 Alternative 1 - Digester Gas End Uses 1-22
Figure 1.17 Alternative 1 - Annual O&M Costs 1-23
Figure 1.18 Alternative 2 - Electrical Process Schematic 1-24 Figure 1.19 Alternative 2 - Biogas Process Schematic 1-24 Figure 1.20 Alternative 2 - Digester Gas End Uses 1-25
Figure 1.21 Alternative 2 - Annual O&M Costs 1-26
Figure 1.22 Alternative 3 - Process Flow Schematic 1-27 Figure 1.23 Alternative 3 - Proposed Layout 1-28
Figure 1.24 Alternative 3 - Projected Electrical Consumption 1-31 Figure 1.25 Alternative 3 - Digester Gas End Uses 1-32
Figure 1.26 Alternative 3 - Annual O&M Costs 1-32
Figure 1.27 Alternative 4 - Process Flow Schematic 1-34 Figure 1.28 Alternative 4 - Proposed Layout 1-35
Figure 1.29 Alternative 4 - Projected Electrical Consumption 1-37 Figure 1.30 Alternative 4 - Digester Gas End Uses 1-38
Figure 1.31 Alternative 4 - Annual O&M Costs 1-39
Figure 1.32 Alternative 5 - Process Flow Schematic 1-40 Figure 1.33 Alternative 5 - Proposed Layout 1-41
Figure 1.34 Alternative 5 - Projected Electrical Consumption 1-43 Figure 1.35 Alternative 5 - Digester Gas End Uses 1-44
Figure 1.36 Alternative 5 - Annual O&M Costs 1-44
Figure 1.37 Alternative 6 - Electrical Process Schematic 1-46 Figure 1.38 Alternative 6 - Biogas Process Schematic 1-46 Figure 1.39 Alternative 6 - Digester Gas End Uses 1-48
Figure 1.40 Alternative 6 - Annual O&M Costs 1-49
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
Abbreviations
APCD Air Pollution Control District
BACT Best Available Control Technology
BTU/scf British thermal units per standard cubic foot
C Celsius
CEQA California Environmental Quality Act
cfd cubic feet per day
cfm cubic feet per minute
cfs cubic feet per second
City City of Santa Maria
CNG compressed natural gas
CO2e carbon dioxide equivalent
DG digester gas
FCE fuel cell energy
FOG fats, oils, and grease
ft foot or feet
ft3 cubic feet
H height
H2S hydrogen sulfide
hp horsepower
IRA Inflation Reduction Act
ITC Investment Tax Credit
kWh kilo-watt hour
L length
lb pound
LCFS Low Carbon Fuel Standard
LHV lower heating value
MG million gallons
mgd million gallons per day
MMBTU million British thermal units
MW megawatt
MWh megawatt hour
N/A not applicable
NOx nitrogen oxides
NREL National Renewable Energy Laboratory
O&M operations and maintenance
PG&E Pacific Gas and Electric
PPA Power Purchase Agreement
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN v
ppd pounds per day
ppm parts per million
PS primary sludge
PV photo-voltaic
RFS Renewable Fuel Standard
SB Senate Bill
scfm standard cubic feet per minute
SGIP Self-Generation Incentive Program
TOU Time of Use
VFD variable frequency drive
VOC volatile organic compounds
VSS volatile suspended solids
W width
WAS waste activated sludge
WWTP wastewater treatment plant
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 ENERGY MANAGEMENT

1.1 Introduction
The City of Santa Maria (City) runs a comprehensive liquid and solid wastewater treatment plant (WWTP) that treats flows of about 6.5 million gallons per day (mgd) on average in 2024. The liquid stream facilities consist of headworks, clarifiers, trickling filters, and percolation ponds. The solid stream facilities consist of thickeners, digesters, and sludge drying beds. A laboratory, an operations building, a modular building, and an administration building on-site house staff and permit management of the site. Per Volume 6 of this Master Plan, the City has selected the following treatment process for the Phase 1 expansion project:
 4-Stage Bardenpho Activated Sludge Process with Primary Clarifiers and Digesters.

Figure 1.1 shows the proposed process treatment layout for this alternative.

Figure 1.1 Selected Treatment Alternative for Santa Maria WWTP The expansion of the WWTP per the selected alternative will require a significant increase in electrical power demand, up to approximately 668 kilowatts (kW). The selected treatment alternative also includes upgrading the existing anaerobic digesters that will produce digester gas for beneficial use. As such, this Volume of the Master Plan will discuss alternatives for beneficial use of the digester gas, and develop process schematics, layouts, and cost estimates for each.

The City has identified and scoped a 720-kW solar array for use on its existing property adjacent to the WWTP. The energy alternatives considered in this Volume will proceed with the inclusion of that solar array. This means that each alternative will account for a corresponding reduction in electrical demand resulting from the solar array.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
The alternatives for beneficial use of biogas to be evaluated are as follows:

1. Alternative 1 (Base Case and current operation): Heat Recovery with Boilers and flare remaining digester gas (DG).

2. Alternative 2: Alternative 1 + Power Management using Microgrid and Battery.

3. Alternative 3: Power and Heat Generation using 635 kW Gas Engine + Power Management using Microgrid and Battery.

4. Alternative 4: Power and Heat Generation using 400 kW Microturbine + Power Management using Microgrid and Battery.

5. Alternative 5: Power and Heat Generation using 400 kW Microturbine + Power Management using Microgrid and Battery.

6. Alternative 6: Heat Recovery with Boilers + Compression of remaining biogas to Compressed Natural Gas (CNG) for Pipeline Injection + Power Management using Microgrid and Battery.

The goal is to evaluate the most feasible and cost-effective alternative for the beneficial re-use of biogas and energy recovery.

1.2 Data Gathering

1.2.1 Current Electrical Demand and Charges
To supply power to the site, the City is serviced by Pacific Gas and Electric (PG&E). A 1-megawatt (MW) backup generator is also available to provide standby power when needed. PG&E works with Central Coast Community Energy to procure and deliver the required electricity.

The historical energy use by month for the period of September 2023 to August 2024 for the Santa Maria WWTP is shown in Figure 1.2. As indicated, the highest power use occurred in the colder winter months, reaching an average of 185,000 kilowatt-hours (kWh) in January 2024.

Figure 1.2 WWTP Average Monthly Usage (September 2023 - August 2024) VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
The daily power usage averaged 5,600 kWh in 2023 to 2024; approximately 233 kW of continuous load. As noted, higher usage was seen in the winter months, but there is a lot of variation at the site.

Peak demand to the site provides insight into the maximum electrical loads required for the site. The peak demands are shown over the same period in Figure 1.3. Peak demand in this case is the highest instantaneous load provided to the site during the entire billing period.

Figure 1.3 WWTP Peak Demand by Month (September 2023 - August 2024) The peak demand per month showed less variation, reaching a maximum of 320 kW, with slightly lower peaks observed during the summer months.

1.2.1.1 Current Electrical Costs
The City is currently on a BS19-S Medium High Use plan. This "Medium-High" Use indicates demand consistently between 500-1,000 kW. The "S" option in the BS19 plan indicates the City has storage of a rated capacity of 10 percent of the peak demand. This is a Time-of-Use (TOU) plan, which states that the prices for each unit of energy delivered and utilized are dependent on the time of day and season.

Depending on the required electrical demands of the facilities after Phase 1 construction, and the potential for storage and renewable generation on-site, the City may need to enroll in a B20 High Use Plan, which is suited for sites that have peak demands greater than 1 MW over three consecutive months in a year. For the purposes of this evaluation, it will be assumed that the B19-S plan will remain in effect due to the potential demand reductions resulting from the new solar facility and energy management systems to be evaluated.

Monthly average rates for WWTP for year 2024 are presented in Figure 1.4. As shown, the average electricity cost per kWh on a monthly basis ranges from $0.18/kWh to $0.26/kWh.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
Figure 1.4 WWTP Cost per Kilowatt-Hour (September 2023 - August 2024) The electric plan also charges peak and maximum demand fees, based on the demand required to be supplied by the plant. This cost depends on the time of day, and on the max amount of power delivered to the plant (kW) in a time period. The peak demand cost varies from $2.5/kW to $53/kW.

1.2.2 Projected Electrical and Heating Demand for New/Modified WWTP The future WWTP peak electrical demand is based on the sum of equipment power demands in each process area. The loads for each pump and piece of mechanical equipment were estimated using a variety of methods, including pump power equations, similarly sized operating facilities, and other electrical loading estimators.

Based on the process units at each treatment area (included in Appendix A), the total connected load estimated for the Phase 1 treatment facilities is 1,670 kW, based on the design flow rates and loading.

Recently, due to the standardization of variable frequency drives (VFD's) and improved equipment efficiencies, demand factors are utilized to provide an accurate estimation of the power draw at the plant.

Demand factors are applied to the potential connected load, and provide an estimate of the average electrical load for a facility.

For normal operation, a 40 percent demand factor was applied. This further helps to temper the differences in electrical demand during the ramping up of equipment. As such, the projected electrical demand for the new upgraded WWTP are shown in Table 1.1.

Table 1.1 Projected Daily Demand Based on Normal Operation Connected Load (kW)(1) Expected Average Daily Demand (kW)(2,3) 1,670 668
Notes:
(1) Connected load is the sum of all the loads connected to a power source. (2) Maximum Demand is the loading after a 40 percent demand factor is applied, and represents the electrical demand for the site.
(3) Demand factors are typically 40 percent for WWTP plants.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
As illustrated above, the average demand of the site under normal operation is anticipated to reach 668 kW. This is approximately three times the existing usage at the facility.

In order to analyze the effect of energy alternatives on site power, the daily electrical demand was normalized to flow. The projected electrical demand curve for the site is illustrated in Figure 1.5.

Figure 1.5 WWTP Projected Hourly Demand
Using this projected daily demand curve, the impacts of renewable and cogeneration alternatives can be evaluated on an hourly basis.

1.2.2.1 Solar Array
The City has contracted with Forefront Power to design a solar array located on City property east of Black Road. Power generated by the new photo-voltaic (PV) solar array will be connected by an overhead line to the existing plant's electrical power supply. The power from the solar array will be connected downstream of the utility connection from Pacific Gas and Electric (PG&E) and directly feed the plant. The current design AC output of the solar array is 720 kW.

The solar will offset a significant portion of the daily electrical demand of the site. According to the National Renewable Energy Laboratory (NREL) PV Watts Calculator, which incorporates a site's weather patterns and array characteristics, a daily power output curve for the site can be produced. Using the relationship of electrical demand, as shown above, and the calculated PV output, the net demand can be determined, which is shown as the orange curve in Figure 1.6. During the daylight hours the net demand drops as a result of the output from the solar system, which is shown in the blue curve.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.6 WWTP Projected Hourly Net Demand With Solar Output As indicated in Figure 1.6, the net demand from 7 p.m. to 6 a.m. (night-time) is the highest at a little over 900 kW and then decreases to about 300 kW. The net demand during the day (7 a.m. to 6 p.m.), starts low due to the PV output and then begins to increase in the early evening when the plant electrical loads are expected to be the highest. The average solar production and net demand for the plant are shown in Table 1.2.

Table 1.2 Projected Average Daily Demand Based on Normal Operation Average Solar Production (kW) Average Net WWTP Demand (kW) 183 502

1.2.2.2 Projected Heating Demand for Solids Treatment
The Phase 1 Expansion will include the construction of an additional anaerobic digester. Based on design criteria highlighted in Volumes 3 and 6, there will be a total of 1.3 million gallons (MG) of anaerobic digestion constructed. This constitutes an increase of 0.25 MG of digester volume relative to current operation. The heating requirements corresponding to the expansion in volume and thickened sludge are shown in Table 1.3.

Table 1.3 WWTP Expansion Anaerobic Digester Heating Requirements System Anaerobic Digester Heating Requirement (MMBTU/day)(4) Current System 19.2 MMBTU/day(1)
Future System 26 MMBTU/day(2) - 34 MMTBU/day(3)
Notes:
(1) Digester 1 and 3 in operation. City staff have noted this may be over-rated for the heat capacity currently. Future heating load requirements may differ after Phase 1 expansion.
(2) Digester 4 and new digester in operation.
(3) All three digesters in operation.
(4) Assumed 94 percent boiler efficiency.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7

1.2.3 Current and Projected Digester Gas Production
The City currently uses digester gas in boilers for heating the digesters. Any excess gas not used by the boilers is flared. There are two hot water boilers on-site: the primary boiler (Boiler No. 1) burns digester gas with propane gas as a backup, while the standby unit (Boiler No. 2) burns only propane. Gas produced by the anaerobic digesters is sent to Boiler No. 1 as the primary heat source for the hot water system, which heats the anaerobic digesters to 35 degrees Celsius (C). The standby propane boiler (Boiler No. 2) is only utilized when Boiler No. 1 cannot keep up with the heat demand of the digesters or when it is out of service. Any excess gas not used by the boilers to maintain the temperature is flared. Waste Gas Flare 1 and 2 burn excess digester gas and are ignited by a propane pilot. Currently, approximately 22 percent of the gas (about 24.6 standard cubic feet per minute [scfm]) is sent to the boiler, and the remaining 78 percent is flared.

Table 1.4 summarizes the average amount of gas produced on a monthly basis and the average specific yield (gas CH3 produced/pound of volatile suspended solids [VSS] removed) of the digesters since 2018.

Table 1.4 Average Monthly Digester Gas Production and Yield (2018-2024)(1) Digester VSS Removal
Efficiency
Monthly Biogas Produced
(ft3) [cfm]
Biogas Yield
(ft3 of Gas Produced / lb VSS removed)
Biogas CH4
Content
Digester No. 1 57% 2,461,000 [57.0 cfm] 12.9 ~60%
Digester No. 3 56% 2,040,000 [47.2 cfm] 19.3 ~60%
Notes:
cfm - cubic feet per minute; ft3 - cubic feet; lb - pound (1) Includes 2024 data to September 2024.

Using historically observed yields and the currently developed preliminary design criteria for the 4-Stage Bardenpho with Primary Clarifiers, the amount of VSS destruction and the future digester gas production can be estimated.

Table 1.5 highlights the design criteria of the future Phase 1 digestion facilities derived from the BioWin process model presented in Technical Memo 01 and Volume 6.

Table 1.5 Phase 1 Expansion Anaerobic Digester Design Criteria Design Criteria
Estimated VSS Loading From PS
and Thickened WAS(1)
(lb/day)
Future Digester
Volume(2)
(ft3)
Anticipated Biogas
Production(3)
(cfd) [cfm]
Digestion System 32,225 173,780 227,000 to 258,000
[158 to 180 cfm]
Notes:
cfd - cubic feet per day
(1) Design estimates from Volume 6 of the Master Plan.
(2) Future Digester Volume from Volume 6 of the Master Plan, new digester to be built in Phase 1. (3) Biogas Production modelled in BioWin software based on design flow rates.

The projected amount of biogas produced for Alternative 4 under Phase 1 conditions is estimated to be between 227,000 and 258,000 cfd [158 and 180 cfm], in 2034 and 2054, respectively. Assuming a 60 percent methane concentration and 600 British Thermal Units per standard cubic feet (BTU/scf), the energy content inherent in that quantity of gas is between 136 and 155 million British thermal units (MMBTU)/day.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
For the purposes of evaluating the biogas reuse alternatives, the future amount of projected biogas will utilize the values indicated in this section.

1.2.3.1 Food Waste and Fats, Oil and Grease
Fats, oils, and grease (FOG) is a global term to describe the waste typically discarded from kitchens during cooking, food preparation, or cleaning. Most industrial kitchens have grease traps to prevent grease from being discharged to the sewers. FOG can harden in pipes and cause clogging and sewer flow backups.

Most cities, including the City of Santa Maria, have programs to educate residents and businesses about proper disposal practices. The City of Santa Maria’s FOG program includes grease trap inspections and enforcement measures for commercial establishments. Any captured grease under their existing program is cleaned by grease haulers and disposed outside of the City’s service area. Historically, FOG may be considered as a metered component of the feed stream to anaerobic digesters to enhance biogas production, but this impact may be minimal for the City’s operations.

The State of California introduced a food waste program via Senate Bill (SB) 1383, which was approved in 2016. SB 1383 is aimed at reducing landfill disposal and methane emissions from landfills, as well as diverting edible food to those in need. It mandates a 50 percent reduction in organic waste disposal by 2020 and a 75 percent reduction by 2025. Some agencies also choose to add pretreated and blended food waste to their anaerobic digesters in order to further enhance biogas production.

The City currently operates a Food Disposal program focused on reducing the quantity of food disposed in trash bins and promotes the disposal of food waste to yellow bins for composting. This waste is currently diverted along with other green waste to the Engel and Gray composting facility.

For the following reasons, food waste addition into the anaerobic digesters at the WWTP was not considered:
 Chemical Imbalances in Anaerobic Digesters:
» FOG primarily consists of lipids. At high concentrations, the increased loading of lipids into the digester can disrupt the existing bacteria present in the digesters and cause upsets to normal operation and gas production.
 Existing Composting Facility - Engel and Gray:
» Engel and Gray is an existing composting facility located adjacent to the WWTP. The facility currently processes the biosolids from the anaerobic digesters along with biosolids from many wastewater agencies on the Central Coast. Additionally, Engel and Gray also receives and processes green waste from the City and other various agencies and commercial businesses. » It is expected that food waste will continue to be treated by Engel and Gray or at the landfill well into the future. Therefore, an alternative disposal method is not needed.  Biogas Production:
» The projected rates of biogas production from plant primary sludge (PS) and waste activated sludge (WAS) are expected to be sufficient to meet projected plant electrical and heating demands. Therefore, enhancing biogas production via a FOG or food waste treatment program would not provide benefits as the additional gas would need to be flared.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9

1.3 Power/Heating Generation and Management Technologies This section summarizes the various technologies that were evaluated and considered to meet the plant's proposed power and heating demands.

1.3.1 Emissions Regulation
The technologies proposed are intended to remain in compliance with California climate legislation. As noted in Volume 2 Chapter 4 of the Master Plan, wastewater facilities are required to report greenhouse gas emissions to the California Air Resource Board if they produce greater than 10,000 metric tons of carbon dioxide equivalent (CO2e) per year. The City of Santa Maria WWTP currently does not produce that number of emissions under current operations.

The emissions potential for each of the technologies proposed under this section are considered for any net increase in CO2e emissions compared to existing conditions. The City currently utilizes flares and boilers to re-use biogas. Since combustion of biogas will proceed under existing conditions, the net increase of emissions from the implementation of cogeneration units like microturbines, boilers, fuel cells, and gas engines will be minimal. The largest net increase of emissions would result from higher amounts of methane slippage into the atmosphere, but this may be mitigated by keeping the existing flares as standby.

In addition, the other power generation technologies evaluated, including wind energy and a microgrid, both would reduce the overall emissions potential at the facility.

The final selected alternative for power management and generation will need to be incorporated into the CEQA process.

1.3.2 Gas Engines
The selected systems for this analysis are Jenbacher gas engines. Jenbacher is an international supplier of gas engines for the re-utilization of biogas. The product and its rated specifications are shown in Table 1.6. As shown, two alternatives were considered to meet the net demand.

Table 1.6 Gas Engine Specifications
Gas Engine
Model
Maximum
DG Usage
(cfm)
Electrical
Output
(kW)
Thermal Output
(MMBtu/
day)
Electrical
Efficiency
Thermal
Efficiency
Dimensions
(ft, L x W
x H)
Filled Weight
(lbs)
JenBacher
J208 87 335 kW 33.9 36.3%(1) 42.3%(1) 17 x 6.7 x 5.7 11,700 JenBacher
J312 164 635 kW 63.2 39.7%(2) 49.9%(2) 16 x 9 x 9 18,800 Notes:
ft - foot/feet; H - height; L - length; W - weight
(1) Efficiency percentages as reported by the manufacturer. To be conservative, efficiency values were reduced to 33 percent and 39 percent, respectively, in the calculations.
(2) Efficiency percentages as reported by the manufacturer. To be conservative, efficiency values were reduced to 33 percent and 43 percent, respectively, in the calculations.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
Ultimately, after receiving quotations from the vendor for the engines, the Jenbacher J208 analysis was discontinued - the quotation received for this smaller-sized engine had a larger capital cost than the larger engine. The smaller engine provides less electrical output and thus would recoup less cost than the larger engine.

An image of the Jenbacher J312 Gas Engine Unit is shown in Figure 1.7. The J312 model is a gas engine which combusts biogas for both heat and electricity. The J312 features a 12-cylinder V-engine configuration. The exhaust heat produced from this process can be captured using the internal heat exchangers, economizers, and radiators on the unit. The existing WWTP utilizes a hot water loop that is used to heat the thickened digester sludge; the exhaust heat from the engine could be configured to supply heat to the existing hot water loops to maintain current operational practices.

Figure 1.7 Jenbacher J312 Gas Engine

1.3.3 Microturbines
The selected systems for this analysis are Capstone microturbines. Capstone microturbines are an international supplier of microturbines for the re-utilization of biogas.

The manufacturer, Capstone Turbine Corporation, provides heat recovery modules and microturbines. The microturbines are provided within an enclosure that houses multiple modular microturbines. The following Table 1.7 indicates the rated specifications for the microturbines.

Table 1.7 Microturbine Specifications
Microturbine
Model
Electrical Output
(kW)
Thermal Output
(kW) Electrical Efficiency Thermal Efficiency Dimensions(ft, L x W x H) Capstone C400S 400 kW 414 kW 33% 42% 20 x 10 x 10
Capstone C600S 600 kW 760 kW 33% 42% 20 x 10 x 10
Notes:
(1) Efficiency values are rated values provided by the manufacturer. Efficiency values were reduced to 28 percent and 39 percent, respectively, in the calculations.

Figure 1.8 shows the enclosure that houses the turbines. The enclosure size for both the C400S and the C600S options is the same. The only difference between the two is that the C600 option includes 3x200 kW microturbines within the enclosure, whereas the C400 option includes the 2x200 kW microturbines within the same enclosure. Microturbines integrate turbine engines and magnetic generators to generate electricity. The exhaust heat is in the form of hot gas that can be sent to heat VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
recovery modules to reheat digester sludge streams. Similarly to the gas engine, this exhaust heat can be captured and subsequently exchanged with the existing closed hot water loop that currently heats the digesters. This permits existing WWTP process and operation to be preserved.

Figure 1.8 Capstone C600S Enclosure

1.3.4 Pipeline Injection
Pipeline injection refers to the cleaning and compression of biogas into CNG. CNG can be then injected back into existing SoCalGas distribution pipelines.

The nearest natural gas pipeline to the Santa Maria WWTP is illustrated in Figure 1.9. The SoCalGas distribution gas line reaches a terminus at Betteravia Road, about 2-miles from the WWTP, and may have capacity to accept additional compressed natural gas from the WWTP. Further, there is a CNG fuel station located about 0.6-miles from the proposed pipeline injection site. The proximity of the CNG fuel station and the pipeline to the plant provides a potential opportunity for this technology.

However, there are stringent requirements that are necessary for pipeline injection to proceed. To initiate a pipeline injection project, the following interconnection studies are needed:

1. Rule 45: Interconnection Studies:
a. Interconnection Screening Study: Evaluation of the closest pipeline's capacities and their corresponding injection volumes. This is completed by SoCalGas free of charge. b. Preliminary Engineering Study: A preliminary study to evaluate the feasibility and the constructability requirements for pipeline injection. This study has an estimated cost of $100,000. c. Detailed Engineering Study: A comprehensive study that provides engineering reports and recommendations for construction and injection. These studies are expected to cost $1.64 million. d. There must be sufficient demand for CNG at the Interconnection point for SoCalGas to permit the project.

2. Rule 30: Gas Specifications:
a. In order to be utilized, the gas must be conditioned prior to entry into the pipeline system. Water content, heating values, inert chemicals, and hydrogen sulfide levels are all carefully monitored by an online monitoring system. If the gas does not meet the on-line quality requirements a valve in the pipeline will automatically close and the gas will need to be flared.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
Figure 1.9 Proximity of WWTP to SoCalGas Pipeline
Pipeline injection would require the construction of a natural gas pipeline that can send any produced biogas to existing SoCalGas distribution lines.

1.3.5 Boilers
Boilers are the current form of heat recovery utilized by the site. The local distributor for firetube boilers in the region is RF Macdonald, which provides boilers from Cleaver Brooks. The model currently utilized by the City is a CB-700-60 firetube boiler with a rated heat input of 2.51 MMTBU/hour. The selected model for this analysis is the CBJT firetube boiler, shown in Figure 1.10. This firetube boiler runs on both natural gas and propane and achieves <30 parts per million (ppm) nitrogen oxides (NOx) in the exhaust.

The specifications for this boiler are indicated in Table 1.8.

Table 1.8 Boiler Specifications
Boiler Model Fuel Source Boiler Horsepower
(hp)
Possible Heat Output(1)
(MMBtu/hour)
Dimensions(1)
(ft, L x W x H)
CBJT-2D Natural gas, propane 50-200 2.01 13 x 5 x 4.5
Notes:
hp - horsepower
(1) 60-hp boiler dimension shown.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13
Figure 1.10 Cleaver Brooks CBJT Boiler
Firetube boilers combust biogas or propane to heat flue gases. The hot flue gas transmits heat to water within the boiler shell. As the heat is transferred from combustion to the water within the shell, the hot water/steam can subsequently transfer heat to any adjacent hot water loops that can heat the thickened sludge lines feeding the digesters.

1.3.6 Microgrid
For the purposes of this analysis, microgrids are considered as part of the energy management solutions.

A microgrid consists of battery storage and a control system that regulates on-site electrical generation and electrical demands from the treatment facility. A microgrid at the Santa Maria WWTP would include the new solar array and a battery system, which would store electricity generated by the solar panels and supply it to help meet the facility's energy demands. The microgrid would also match instantaneous plant demands with the generation of electrical power from a biogas beneficial reuse system.

Further, the City currently has a 1 MW standby generator that would remain and be connected to the microgrid system to provide backup power in the event of a failure. It is anticipated that a larger standby generator will be installed.

A microgrid combined with different alternatives for beneficial reuse of biogas would provide cost savings from the offset of peak purchase prices. It may also provide resilience in the case of blackouts. It is also considered for the analysis because of the net demand; it is optimal to recover and charge a battery with energy produced from biogas rather than returning energy back to the grid via a net metering program.

To evaluate the microgrid and its cost savings, the HOMER grid software was used. This software optimizes the cost savings that can be generated from a microgrid. More information on the HOMER software is be provided below.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Figure 1.11 provides a representation of a microgrid.

Source: DVL Group, 2024, https://www.dvlnet.com/blog/microgrids-part-1.

Figure 1.11 Example Representation of a Microgrid

1.3.6.1 HOMER Software
HOMER Grid is a simulation and optimization tool designed to help engineers, project developers, and energy planners design and analyze distributed energy systems. In this case, HOMER provided the optimal sizing of the battery for the site based on energy requirements and generated average cost reductions from peak load shaving. By using the electric inputs discussed above, an accurate representation of the cost savings from the battery and the microgrid can be developed.

Using the projected PV output, the existing BS-19S tariff structure, and the projected electrical demand as inputs, the software compared the costs and electrical production of the WWTP for two cases:

1. Purchasing electricity from PG&E and using the solar array.

2. Purchasing electricity from PG&E, using the solar array, and load shaving with a battery and microgrid.

Using the inputs, the software estimated a battery storage requirement of 3.5 MWh, with 4 hours of autonomy. This storage requirement corresponds to roughly a 1 MW battery, as a cost-optimal size for the electrical demand of the WWTP.

In Case 1, evaluating the grid and the solar array, HOMER produced the following average annual cost and electrical production in Table 1.9 (averaged over 20 years).

Table 1.9 Case 1 - Homer Software Results - Grid and Solar Only Rated Battery
Size
(kWh)
Electricity Purchased
From Grid
(kWh)
Consumption
Charge(1)
($)
Demand Charge(1)
($)
Fixed Cost(1)
($)
Total(1)
($)
N/A 3,684,727 445,138 307,859 4,105 757,101
Notes:

N/A - not applicable
(1) Average annual cost, 2025 dollars.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15
Based on the provided metrics from the software, the average annual cost per kWh may be determined.

By dividing the total cost by electrical production, the resultant cost per kWh is equal to $0.21/kWh.

In Case 2, evaluating the grid, the solar array, and a battery, HOMER produced the following average annual cost and electrical production in Table 1.10 (averaged over 20 years).

Table 1.10 Case 2 - Homer Software Results - Grid, Solar, and Battery Rated Battery
Size
(kWh)
Electricity Purchased
From Grid
(kWh)
Consumption
Charge(1)
($)
Demand Charge(1)
($)
Fixed Cost(1)
($)
Total(1)
($)
3,450 3,684,727 445,138 188,012 4,105 637,254
Notes:
(1) Average annual cost, 2025 dollars.

Based on the provided metrics from the software, the average annual cost per kWh may be determined.

By dividing the total cost by electrical production, the resultant cost per kWh is equal to $0.17/kWh.

As such, by comparing Case 1 and Case 2, the average cost savings from load shaving and battery storage are equal to $0.04/kWh. This value is applied to each alternative' electric consumption after cogeneration to evaluate the benefit of the battery system.

HOMER grid software also provided values for the operations and maintenance (O&M) cost of the batteries, their replacement cost, and their capital cost annualized over the lifespan. These values are provided in each individual section.

1.3.7 Wind Energy
For the purposes of this analysis, wind energy was considered as a possible power source. The WWTP is located about 9 miles from the ocean and regularly receives ocean breezes. However, after investigation, it was determined that wind energy will not provide sufficient value to justify its installation. This is due to multiple factors, including stringent siting requirements, available power demand, permitting challenges, and size constraints. Further, with the utilization of solar and the potential beneficial reuse of digester gas, the energy recovery from a wind turbine will not yield the necessary payback required for the system.

Some of the constraints associated with wind turbine systems are:
 Siting Requirements:
» Wind turbines occupy more vertical space than other renewable energy systems, such as solar, for example, making them subject to height and aesthetic restrictions that other systems may not be subject to.
» Wind turbines cause noise pollution that will require additional permitting notifications under California Environmental Quality Act (CEQA).
» Wind turbines at the size appropriate for the WWTP could become a hazard for the large number of birds that migrate to and from the site.
 Available Power Demand and Capital Cost:
» As mentioned above, the net power requirements for the facility are projected to range from 100-900 kW. As such, the wind turbine for this site would likely be sized around 600 kW. However, according to the Department of Energy, average wind turbine sizes range much larger in the VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-16
2,500-3,000 kW range. Due to the significant capital cost required, the 600 kW wind turbine required for the site would be less likely to provide sufficient value to recoup the capital cost.  Smaller-sized wind turbines are less efficient due to less wind capture and sweep area.  The variability of wind speed would decrease the efficiency of the turbines, further reducing the value of its investment.

1.3.8 Fuel Cells
Power and heat recovery by using biogas in Fuel Cells was also evaluated. After discussions with Fuel Cell Energy (FCE), a manufacturer of fuel cell systems in Southern California, internal experts, and with Power Purchase Agreement (PPA) purveyors, it was determined that this technology is not a feasible alternative.

The reasons for this are:

1. There would be insufficient biogas flow and associated energy savings for the energy provider to recoup the required capital. There are no known installations in WWTPs of small fuel cell systems of the size that would be applicable for this facility. Most systems in operation that have a reasonable track record are significantly larger.
a. Examples of fuel cell systems in operation at WWTPs in California include:
i. City of Sacramento - 2.8 MW.
ii. City of San Bernardino - 1.4 MW.
iii. City of Chino WWTP - 2.8 MW.
iv. City of San Diego South Bay - 1.4 MW.
v. City of Riverside - 1.4 MW.

2. Fuel cells are sensitive to fluctuations of biogas flows, more so than other alternatives, and fuel cells are sensitive to the quality of the biogas. This may develop into significant process challenges later on, particularly if any provider is not involved in the design process.

Based on this evaluation, it was concluded that suitably sized fuel cells with a good operational track record in WWTPs were not currently available. For these reasons, fuel cells were not considered any further.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-17

1.4 Site Layouts
On the existing WWTP, northwest of the digester control building, and southeast of the operations warehouse, there is space that would be available for the construction and development of Digester Gas Beneficial Use facilities. This space spans roughly 100 ft by 160 ft and is located just northwest of the digesters, with existing underground gas piping that can connect to the proposed treatment trains.

The available space is indicated in the following Figure 1.12.

Figure 1.12 Available Space for Cogeneration Alternatives VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-18
On the existing WWTP, there is also space to house the future battery storage and microgrid system. The microgrid and battery will be located on the existing site to facilitate connection to the CHP system and the PG&E interconnection point located in the administration building. The location of the solar array is located in the parcel of land east of Black Road and will be connected to the microgrid and the primary switchboard with transmission lines.

The locations are illustrated on Figure 1.13.

Figure 1.13 Proposed Locations of the Power Management Systems at Santa Maria WWTP

1.5 Digester Gas Beneficial Use Alternatives
As presented above, the following alternatives are evaluated for beneficial use of the digester gas:

1. Alternative 1 (Base Case and current operation): Heat Recovery with Boilers and flare remaining DG.

2. Alternative 2: Alternative 1 + Power Management using Microgrid and Battery.

3. Alternative 3: Power and Heat Generation using 635 kW Gas Engine + Power Management using Microgrid and Battery.

4. Alternative 4: Power and Heat Generation using 400 kW Microturbine + Power Management using Microgrid and Battery.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-19

5. Alternative 5: Power and Heat Generation using 600 kW Microturbine + Power Management using Microgrid and Battery.

6. Alternative 6: Heat Recovery with Boilers + Compression of remaining biogas to CNG for Pipeline Injection + Power Management using Microgrid and Battery.

1.5.1 Alternatives Evaluation Basis
For each alternative, the following will be developed:
 Preliminary treatment process layout.
 Preliminary sizing of equipment.
 Life Cycle Cost Estimate:
» Includes construction cost and O&M costs normalized over 20 years. » Net Present Cost and Compound Payback used as financial metrics.

The alternatives were compared based on cost, feasibility, and O&M implementation. The life-cycle costs of the cogeneration alternatives will utilize financial assumptions based on the values represented in Chapter 2 of this Master Plan. The starting point of the analysis is 2034, when construction of Phase 1 is expected to be completed.

The analysis will proceed using HOMER Grid software and Excel modeling that optimizes the electrical savings that can be generated from hybrid electrical systems. HOMER Grid software determines the optimal battery size for the required electrical output and calculates the annual cost savings of each option compared to using only the solar array and the grid. These savings are reflected as an average cost per kilowatt-hour ($/kWh) for either scenario.

To fully capture the utility of each cogeneration alternative, a 20-year life cycle analysis was completed in conjunction with the HOMER software reports. The following assumptions were used to guide the analysis:

1. All alternative savings are compared to the existing system, consisting of a solar array and purchasing from the grid.

2. Any excess gas flow not recovered by each system is flared or sent to a pipeline.

Appendix B provides details of the life cycle cost analysis tables and HOMER Grid reports developed for this section.

1.5.1.1 Grants and Power Purchase Agreements
Grants and financial aid were considered in the analysis. California and the federal government offer incentives for energy recovery. This applies to multiple forms of generation.

Although grants and financial aid are reported in this analysis, it is important to consider that the grants are not necessarily permanent. Subsidies may change and are reliant on continued funding from the California State Legislature. For example, the Biomethane Monetary Incentive Program is currently funded until 2026, well before the scope of the project, and the Self Generation Incentive Program (SGIP) is currently funded through 2025.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-20
Federal programs include the Renewable Fuel Standard (RFS) that mandates renewable fuels to be blended into the Nation's fuel supply and thus provides incentives for renewable fuel production. It also includes the Investment Tax Credit (ITC), which provides tax credits for the capital costs of battery storage systems. ITC funding is currently available until December 31, 2032, under provisions of the Inflation Reduction Act (IRA).

The following credits and incentives were considered for each alternative and are shown in Table 1.11.

Table 1.11 Financial Incentives for DG Beneficial Use Alternatives(1) Alternative Available Incentive
1 - CHP Gas Engine  SGIP
2 - Microturbines  SGIP
4 - Pipeline Injection  California's Low Carbon Fuel Standard (LCFS)  RFS
 BioMethane Monetary Incentive Program
5 - Solar and Batteries Microgrid  ITC
Notes:
(1) Refer to Alternative 3 Section Below.

In order for any generation technology to receive an SGIP grant, the project must be a local governmental agency wherein at least 50 percent of the census tracts that are served are disadvantaged, tribal, or low-income. According to the CPUC Non-Residential Eligibility Map that tracks the status of those criteria, the Santa Maria WWTP expansion qualifies for this program. As such, each alternative was evaluated for the benefits and grants provided under this program. The details of each incentive and whether the proposed technology or alternative would apply are discussed in each section.

It is important to note that the qualification of the incentives also requires an increase in the monitoring and reporting requirements of each alternative.

PPA's were also considered. In PPA's, a company provides the upfront cost, maintains the system, and owns the energy system, in exchange for higher fees and electrical costs from the utility (in this case, Santa Maria). However, discussions with various PPA vendors and cogeneration technology suppliers indicated there was not enough demand at this time for those companies to provide this service. PPA's may be a potential option moving forward, however the establishment of PPA's will require increased interest and continued discussions between a financial provider and City representatives.

1.5.2 Alternative 1 (Base Case and Current Operation): Heat Recovery With Boilers and Flare Remaining DG
This alternative represents a "no change" alternative to current operations with regards to heat recovery; a new boiler and flaring system will be installed as a direct replacement to the existing system. The boiler and flaring system will both be configured in a duty-standby system. There will be a minor fuel treatment system, including H2S and moisture removal, installed prior to the boilers to extend the operational life of the boilers, consisting of a single vessel, gas blower, and particulate filter.

Electrically, a solar array and purchase from the grid will power the plant. This alternative would not include a microgrid control system or batteries.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-21
The following process schematic for this alternative is illustrated in Figures 1.14 and 1.15.

Figure 1.14 Alternative 1 - Electrical Process Schematic Figure 1.15 Alternative 1 - Biogas Process Schematic

1.5.2.1 Life Cycle Cost Analysis
The following design parameters were modelled over a 20-year period. The annual life cycle assumptions utilized for the system were developed using the following baseline criteria in Table 1.12.

Table 1.12 Life Cycle Analysis Criteria - Alternative 1 Parameters Units Values
Estimated Average Biogas Production(1) cfm 158 - 180
Available Energy From Biogas MMBTU/hr 5.7 - 6.4
Boiler Heat Recovered(2) MMBTU/hr 1.1 - 1.4
Boiler Efficiency % 94
Gas Flared cfm 102 - 139
Notes:
(1) Range of values represents start of 20-year period to end of 20-year period, comment typical for every range illustrated. (2) Heating requirement of anaerobic digesters.

The capital cost for the new duty-standby boilers, gas conditioning and flares was developed using a budgetary cost estimate of the equipment. Indirect cost factors, contingencies and financial factors VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-22
presented in Volume 2 of this master plan were applied. The capital cost was escalated to 2034 dollars, the starting point of the analysis. The cost analysis did not include cost for the solar array as that system will be the same for all alternatives.

The power cost modeled in this scenario was based on Section 1.3.2 above. The net demand of 502 kW was averaged out over a 20-year period. Then, the 0.21$/kWh power cost was applied.

Financial Grants and Incentives
There were no financial grants and incentives considered because no energy generation or storage technologies are included in this alternative.

1.5.2.2 Results
The net demand for this alternative is 502 kW. This corresponds to an annual consumption of ~4,400 MWh per year based on net demand. The quantity of gas flared and re-used is illustrated in the following Figure 1.16.

Figure 1.16 Alternative 1 - Digester Gas End Uses
The Annual O&M costs for this alternative in 2034 are presented in Figure 1.17.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-23
Figure 1.17 Alternative 1 - Annual O&M Costs
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined and presented in Table 1.13. The Net Present Cost indicates the current cost of the alternative, represented as a lump sum to be paid at the outset.

Table 1.13 Life Cycle Cost Analysis - Alternative 1 (Base Case) Boiler and Solar 20-Year Average Annual Cost, 2025 Dollars Estimated Project Cost $13,300,000
20-year Life Cycle O&M Costs $13,200,000
Net Present Cost $26,500,000

1.5.2.3 Operational, Regulatory and Maintenance Considerations The operational requirements of this system are primarily based on the continued usage of the waste gas flare and the boiler. This system is familiar to current operational staff and thus would cause a minimal burden to continue to maintain.

The reporting and monitoring requirements of flaring would continue to be necessary. The current Air Pollution Control District (APCD) permitting process is typically renewed every 3 years. The current permitted flaring limit is about 335 cfm; this alternative would flare around 126 cfm in 2034.

1.5.3 Alternative 2: Alternative 1 + Power Management Using Microgrid and Battery
This alternative represents a "no change" alternative with regards to heat recovery; a new boiler and flaring system will be installed as a direct replacement to the existing system. There will be a minor fuel treatment system, including H2S and moisture removal, installed prior to the boilers to extend the operational life of the boilers, consisting of a single vessel, gas blower, and particulate filter. Electrically, a $1,350,000
$-
$1,260,000
$24,000
$42,000
$18,000
$3,000
Net Annual Cost
Power Cost
O&M costs for fuel treatment
O&M costs for boiler
O&M costs for solar
O&M costs for flare
Annual O&M Costs, 2034 dollars
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-24
battery and microgrid system will be installed in addition to the existing solar array. The following schematics depict the electrical and biogas process flows for this alternative (Figures 1.18 and 1.19).

Figure 1.18 Alternative 2 - Electrical Process Schematic Figure 1.19 Alternative 2 - Biogas Process Schematic

1.5.3.1 Life Cycle Cost Analysis
The following design parameters were modelled over a 20-year period. The annual electricity production generated for each system was developed using the following baseline criteria in Table 1.14.

Table 1.14 Life Cycle Analysis Criteria - Alternative 2 Parameters Units Values
Estimated Average Biogas Production(1) cfm 158 - 180
Available Energy From Biogas MMBTU/hr 5.7 - 6.4
Boiler Heat Recovered(2) MMBTU/hr 1.1 - 1.4
Boiler Efficiency % 94
Gas Flared cfm 102 - 139
Battery Size MWh 3.5
Notes:
(1) Range of values represents start of 20-year period to end of 20-year period, comment typical for every range illustrated. (2) Heating requirement of anaerobic digesters.

The capital cost for the battery system, with new duty-standby boilers and duty-standby flares, was developed using a budgetary cost estimate of the equipment. The cost of the batteries was developed from HOMER software. A small gas conditioning system installed prior to the boiler and its capital cost was developed similarly.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-25
Financial Grants and Incentives
Other assumptions incorporated into this analysis include the incorporation of incentives. The following Table 1.15 lists the incentives available for deployment of the battery system.

Table 1.15 Financial Incentives for Alternative 2
Selected Treatment Incentive Qualification? Current Rate(1,2) Projected Benefit Battery Storage  SGIP
» Large Scale Storage (>10
kW)
» Currently in Step 5
» Applied to capital cost
Yes -

3.5 MWh
system, 4-hour
duration
$ .25 / Watt-hour,
100% for first
2 hours of storage,
50% for hours 2-4
of storage
Not Applied - SGIP
funds not likely to be
available in the 2030s
Battery Storage  ITC
» 6% base credit
» Prevailing wage, low-income
community and domestic
content adders raise the
percentage by 10% each
» Applied to capital cost
Yes - federal
benefit
applicable to all
battery storage
projects

0.18% of capital
cost(3)
$316,000 - funds
expected to be
available until 2033
Notes:
(1) Current rates are subject to state subsidies and incentive programs and may not be applicable in the future. (2) Incentives based on continued compliance performance-based requirements, including efficiency and discharge. (3) Assumes domestic content and prevailing wage adders; 26 percent of the capital cost, available for ~70 percent of the total.

1.5.3.2 Results
The HOMER software sized the battery at 3.5 MWh of storage and an autonomy of 4.6 hours. As indicated in the site layout above, this sizing will be sufficient to manage the electrical loads into the site and provide peak shaving to reduce demand costs. The net demand for this alternative is the same as Alternative 1 at 502 kW. This corresponds to an annual consumption of ~4,400 MWh per year based on net demand.

The quantity of gas flared and reused is illustrated in Figure 1.20.

Figure 1.20 Alternative 2 - Digester Gas End Uses
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-26
The Life Cycle cost for this alternative was calculated utilizing multiple factors, including the cost of electricity saved by using load shaving from peak hours, the peak demand saved, and the cost O&M on the maintenance of the system. The annual O&M costs in the first year of operation are shown in Figure 1.21.

Figure 1.21 Alternative 2 - Annual O&M Costs
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined. and presented in Table 1.16.

Table 1.16 Life Cycle Cost Analysis – Alternative 2 (Base Case + Boiler, Battery, and Solar) Boiler, Battery and Solar 20-Year Average Annual Cost, 2025 Dollars Estimated Project Cost $15,100,000
20-Year Life Cycle O&M Costs $12,200,000
Net Present Cost $$27,300,000

1.5.3.3 Operational, Regulatory, and Maintenance Considerations The operational requirements of this system are primarily based on the continued usage of the waste gas flare and the boiler. This system is familiar to current operational staff and thus would cause a minimal burden to continue to maintain.

The reporting and monitoring requirements of flaring would continue to be necessary. The current APCD permitting process typically is renewed every 3 years. The current permitted flaring limit is about 335 cfm; This alternative would flare about 126 cfm of flaring in 2034.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-27
The maintenance of batteries requires battery management software and monitoring. The maintenance may also be outsourced to companies that specialize in battery management systems. However, it is important to consider that a battery will require additional monitoring.

Further, there is sufficient space, both in the facility, or near the solar array, to place the battery. Its small size and modularity allow for convenient installation.

1.5.4 Alternative 3: Power and Heat Generation Using 635 kW Gas Engine + Power Management Using Microgrid and Battery
Combined Heat and Power engines produce heat for re-use in anaerobic digesters, and electricity for re-use at the facility. Figure 1.22 presents the process flow diagram for this alternative.

The gas will be treated before entering the system to maintain high engine performance standards and meet APCD requirements for exhaust emissions. The proposed gas treatment system will include hydrogen sulfide (H2S), siloxane, and moisture removal. The specific technologies for each stage of the gas treatment shown are shown in the following list:
 Moisture Removal: knockout vessel that provides separation of gas and liquid phases of biogas.  H2S Removal: Iron sponge scrubber to remove excess H2S.  Siloxane and volatile organic compounds (VOC) Removal: Activated Carbon media vessels to remove siloxanes and VOCs in the gas that reduce longevity of the engines.  Gas Storage: In-line pressure-controlled tanks sized with 30-minute ramp down of flow (1,500 ft3).

There are other items that constitute the gas conditioning skid, including control systems, pressure regulators, temp and heat exchangers. These are considered to be integrated within the gas conditioning skid and CHP module.

The exhaust heat from the gas engines will be recovered through a series of hot water loops and used for anaerobic digesters heating. A duty-standby flare and a standby boiler will remain as a backup in the case of engine downtime.

Figure 1.22 Alternative 3 - Process Flow Schematic
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-28
The specifications for the biogas conditioning skid and their dimensions are indicated in the following Table 1.17. The conditioning skid and its dimensions are sufficient to handle the estimated biogas production.

Table 1.17 Gas Conditioning Skid Specifications
Conditioning Stage System Quantity Flow Rate
(cfm) Media Dimensions(ft, L x W x H)
Moisture Removal Knockout Vessel 1 50-350 N/A 5.5 x 3 x 5 Compression Blowers 3 15-300 N/A 10 x 5 x 5
H2S Removal Lead-Lag Vessels 2 up to 780 FerroSorp 8 x 8 x 7 Siloxane Removal GAC Vessels 2 up to 780 Calgon VPR 8 x 8 x 12 Gas Storage Pressurized Buffer Tanks 9 N/A N/A 16 x 4 x 7 Proposed site layout for this alternative is shown in Figure 1.23.

Figure 1.23 Alternative 3 - Proposed Layout
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-29

1.5.4.1 Life Cycle Cost Analysis
The following design parameters were modeled over a 20-year period. The annual electricity production generated for each system was developed using the following baseline criteria in Table 1.18.

Table 1.18 Life Cycle Analysis Criteria - Alternative 3 Parameters Units Values
Estimated Average Biogas Production(1) (cfm) 158 - 180
Available Energy Input(1) (MMBTU/hr) 5.7 - 6.4
1 x Jenbacher J312 series (kW) 635
Required Energy Input (at 100% capacity) (MMBTU/hr) 5.9 Required Input DG flow(at 100% capacity) (cfm) 164
Assumed Uptime (%) 88%
Electrical Efficiency % 33%
Power Produced (at 100% capacity) kW 615
Parasitic Electric Power kW 20
Heat Energy Recovered(2) (MMBTU/day) 26-34
Battery Size MWh 3.5
Notes:
(1) Range of values represents start of 20-year period to end of 20-year period. (2) Based on heat sent to anaerobic digester.

The capital cost for the gas engine, with a gas conditioning system, a microgrid, and a duty-standby flare, and a standby boiler was developed using a budgetary cost estimate of the equipment. The cost of the batteries and microgrid were developed from HOMER software. Indirect costs, contingencies and financial factors presented in Volume 2 of this master plan were applied. The capital cost was escalated to 2034 dollars, the starting point of the analysis.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-30
Grants and Incentives
Other assumptions incorporated into this analysis include the incorporation of incentives. The following Table 1.19 lists the incentives currently available for deployment of gas engines.

Table 1.19 Financial Incentives for Gas Engines
Selected Treatment Incentive Qualification? Current Rate(1) Projected Benefit CHP Gas Engines  SGIP
» Base Incentive
» Applied to capital cost of
equipment
Yes 2$ / Watt Not Applied - current
California funding
levels to expire by
2025
CHP Gas Engines  SGIP
» Resiliency Adder
» Applied to capital cost of
equipment
No - City does not
qualify

2.5$ / Watt Not Applied - current
California funding
levels to expire by
2025
Battery Storage  SGIP
» Large Scale Storage
(>10 kW)
» Currently in Step 5
» Applied to capital cost
Yes -

3.5 MWh system,
4 hour duration
$ .25 / Watt-hour,
100% for first
2 hours of storage,
50% for hours 2-4
of storage
Not Applied - SGIP
funds not likely to be
available in the 2030s
Battery Storage  ITC
» 6% base credit
» Prevailing wage, low-income community and
domestic content adders
raise the percentage by
10% each
» Applied to capital cost of
equipment
Yes - federal
benefit applicable
to all battery
storage projects

0.18% of capital
cost(3)
$316,000 - funds
expected to be
available until 2033
Notes:
(1) Current rates are subject to state subsidies and incentive programs and may not be applicable in the future. (2) Incentives based on continued compliance performance-based requirements, including efficiency and discharge. (3) Assumes domestic content and prevailing wage adders; 26 percent of the capital cost, available for ~70 percent of the total.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-31

1.5.4.2 Results
Figure 1.24 reflects the electrical consumption on the site over the time period. The figure illustrates the net utility purchase required based on net demand, the available electricity produced by the cogeneration, and the net utility purchase required after cogeneration. In this case, the 635 kW gas engine produces sufficient electricity to power the plant entirely from its first year of operation.

Figure 1.24 Alternative 3 - Projected Electrical Consumption VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-32
The electrical production above accounts for the following availability of biogas. In this scenario, there will be insufficient biogas for the engine to run at maximum capacity for the whole life cycle. The maximum capacity of the gas engine will be reached by 2044.

The amount of biogas and the flaring rates for this scenario over twenty years are shown in Figure 1.25.

Figure 1.25 Alternative 3 - Digester Gas End Uses
By the end of the 20 years, there will be excess biogas that needs to be flared. Based on the chart, roughly 21 cfm will need to be flared at the end of the 20-year period.

The Life Cycle cost for this alternative were calculated mainly including the cost of O&M of the equipment. Figure 1.26 describes the O&M costs for the first year of operation in 2034 dollars.

Figure 1.26 Alternative 3 - Annual O&M Costs
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-33
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined and presented in Table 1.20.

Table 1.20 Life Cycle Cost Analysis - Alternative 3 (Gas Engine) Gas Engine 20-Year Average Annual Cost, 2025 Dollars
Estimated Project Cost $21,800,000
20-year Life Cycle O&M Costs $3,100,000
Net Present Cost $24,900,000

1.5.4.3 Construction, Operational, and Regulatory Challenges Operationally, the manufacturer Jenbacher offers a renewable 10-year service agreement for the gas engines. The agreement will require City staff to monitor the system, provide daily inspections of its operation, and perform maintenance on standardized components of the system. However, any large repairs, work orders, and general maintenance of specialized tools will be conducted by the manufacturer through this agreement. The maintenance agreement will serve to minimize O&M needs for this alternative.

From a regulatory perspective, permitting a gas engine in Santa Barbara County must follow existing Best Available Control Technology (BACT) guidelines for the APCD. The Jenbacher gas engine, along with the gas conditioning skid, was selected to comply with these BACT guidelines. Regardless, the regulatory requirements of installing cogeneration under an APCD grant are stringent. There would also be a large degree of monitoring and compliance tasks to maintain compliance with the permits.

From a construction standpoint, there are benefits to this alternative. There is existing space onsite for construction, near to the existing digesters and gas systems. There is also sufficient space for the construction of the microgrid. Given the proximity to the source of the biogas (anaerobic digesters), there will be a minimal impact on construction.

1.5.5 Alternative 4: Power and Heat Generation Using 400 kW Microturbine + Power Management Using Microgrid and Battery
Combined Heat and Power microturbines produce heat for re-use in anaerobic digesters, and electricity for re-use at the facility. The following process flow diagram indicates the standard flow path of digester gas with a digester system (Figure 1.27).

The gas will be treated before entering the system to maintain high microturbine performance standards and meet APCD requirements for exhaust emissions. The proposed gas treatment system will include H2S, siloxane, and moisture removal. The specific technologies for each stage of the gas treatment shown are shown in the following list:
 Moisture Removal: knockout vessel that provides separation of gas and liquid phases of biogas.  H2S Removal: Iron sponge scrubber to remove excess H2S.  Siloxane and VOC Removal: Activated carbon media vessels to remove siloxanes and VOCs in the gas that reduce longevity of the engines.
 Gas Storage: In-line pressured controlled tanks sized with 30-minute ramp down of flow (1,500 ft3).

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-34
There are other items that constitute the gas conditioning skid, including control systems, pressure regulators, temp and heat exchangers. These are considered to be integrated within the gas conditioning skid and CHP module.

The exhaust heat will be recovered and used for anaerobic digesters heating. A backup flare will remain as a backup in the case of engine downtime.

Figure 1.27 Alternative 4 - Process Flow Schematic
The specifications for the biogas conditioning skid and their dimensions are indicated in the following Table 1.21.

Table 1.21 Gas Conditioning Skid Specifications
Conditioning Stage System Quantity Flow Rate
(cfm) Media Dimensions(ft, L x W x H)
Moisture Removal Knockout Vessel 1 50-350 N/A 5.5 x 3 x 5 Compression Blowers 3 15-300 N/A 10 x 5 x 5
H2S Removal Lead-Lag Vessels 2 up to 780 FerroSorp 8 x 8 x 7 Siloxane Removal GAC Vessels 2 up to 780 Calgon VPR 8 x 8 x 12 Gas Storage Pressurized Buffer Tanks 9 N/A N/A 16 x 4 x 7 The proposed layout and dimension of the system on-site is as shown in Figure 1.28.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-35
Figure 1.28 Alternative 4 - Proposed Layout

1.5.5.1 Life Cycle Design Criteria
The following design parameters were modelled over a 20-year period. The annual electricity generated was developed using the following baseline criteria in Table 1.22.

Table 1.22 Life Cycle Analysis Criteria - Alternative 4 Parameters Units Values
Estimated Average Biogas Production(1) scfm 158-180
Available Energy Input1 MMBTU/hr 5.7 - 6.4
2 x Capstone 200kW Microturbines (kW) 400
Required Energy Input (at 100% capacity)(1) (MMBTU/hr) 4.9 Required Input DG flow (at 100% capacity) (cfm) 135
Assumed Uptime (%) 88%
Electrical efficiency % 28
Power Produced kW 380
Parasitic Electrical Power kW 20
Heat Energy Recovered (MMBTU/day) 26-34
Battery Size MWh 3.5
Notes:
ppd – pounds per day; LHV - lower heating value
(1) Range of values indicates from start of 20-yr period to end of 20-yr period.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-36
The capital cost for the microturbines, with a gas conditioning system, a standby boiler, and a new duty-standby flare system, was developed using a budgetary cost estimate of the equipment. The cost of the batteries was developed from HOMER software. Indirect costs, contingencies, and financial factors presented in Volume 2 of this master plan were applied. The capital cost was escalated to 2034 dollars, the starting point of the analysis.

Grants and Incentives
Table 1.23 lists the incentives available for deployment of microturbines.

Table 1.23 Financial Incentives for Microturbines
Selected Treatment Incentive Qualification? Current Rate(1,2,3) Projected Benefit Microturbines  SGIP
» Base Incentive
» Applied to capital cost of
equipment
Yes 2$ / Watt Not Applied - current
California funding
levels to expire by
2025
Microturbines  SGIP
» Resiliency Adder
» Applied to capital cost of
equipment
No 2.5$ / Watt Not Applied - current
California funding
levels to expire by
2025
Battery Storage  SGIP
» Large Scale Storage
(>10 kW)
» Currently in Step 5
 Applied to capital cost
Yes -

3.5 MWh system,
4 hour duration
$ .25 / Watt-hour,
100% for first
2 hours of storage,
50% for hours 2-4
of storage
Not Applied - SGIP
funds not likely to be
available in the 2030s
Battery Storage  ITC
» 6% base credit
» Prevailing wage,
low-income community
and domestic content
adders raise the
percentage by 10% each
» Applied to capital cost of
equipment
Yes -
Federal benefit
applicable to all
battery storage
projects

0.18% of capital
cost(4)
$316,000 - funds
expected to be
available until 2033
Notes:
(1) Current rates are subject to state subsidies and incentive programs and may not be applicable in the future. (2) Incentives based on continued compliance performance-based requirements, including efficiency and emissions rates. (3) Incentives based on continued compliance with reporting and monitoring requirements. (4) Assumes domestic content and prevailing wage adders; 26 percent of the capital cost, available for ~70 percent of the total.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-37

1.5.5.2 Results
Figure 1.29 reflects the electrical consumption on the site over the time period. The figure illustrates the net utility purchase required based on net demand, the available electricity produced by the cogeneration, and the net utility purchase required after cogeneration. In this case, the 400 kW microturbine will never produce sufficient electricity to make the WWTP self-sufficient. The WWTP will continue to purchase utility power with this alternative.

Figure 1.29 Alternative 4 - Projected Electrical Consumption VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-38
In this scenario, there will be enough biogas for the engine to run at maximum capacity for the whole life cycle. This means that the biogas will continue to be flared despite full operation of this microturbine. The amount of biogas and the flaring rates for this scenario over twenty years are shown in Figure 1.30.

Figure 1.30 Alternative 4 - Digester Gas End Uses
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-39
There will be a consistent amount of flaring required for this alternative, starting from 43 cfm in 2034 to around 68 cfm in 2054.

The Life Cycle cost for this alternative was calculated mainly including the cost of O&M of the equipment.

Figure 1.31 describes the O&M costs for the first year of operation in 2034 dollars.

Figure 1.31 Alternative 4 - Annual O&M Costs
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined and presented in Table 1.24.

Table 1.24 Life Cycle Cost Analysis - Alternative 4 (400 kW Microturbine) 400kW Microturbine 20-Year Average Annual Cost, 2025 Dollars Estimated Project Cost $23,100,000
20-year Life Cycle O&M Costs $5,700,000
Net Present Cost $28,800,000

1.5.5.3 Construction, Operational, and Regulatory Considerations Operationally, the manufacturer Capstone offers a renewable 10-year agreement for the microturbines.

The agreement will still require City staff to monitor the system, provide daily inspections of its operation, and perform maintenance on standardized components of the system. However, it excludes City staff from performing planned and corrective maintenance of more integral parts over the span of the agreement. This reduces the burden on City staff.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-40
From a regulatory perspective, microturbines must follow existing BACT guidelines for the APCD. The technologies presented in this analysis were selected to comply with these BACT guidelines. However, the regulatory requirements of installing cogeneration are stringent. It will require significant monitoring and reporting requirements to both state and local agencies. Fuel treatment will be a significant driver of O&M and operational man-hours. Ensuring quality biogas will be essential for the operation of the plant, but may be reduced in reliability.

From a construction standpoint, there is existing space onsite for construction, near to the existing digesters and gas systems. Further, the size of the microturbine system is small and containerized, allowing for smooth integration into the existing system.

1.5.6 Alternative 5: Power and Heat Generation Using 600 kW Microturbine + Power Management Using Microgrid and Battery
This alternative will be the same as Alternative 4, but with three 200kW microturbines to ensure that all the biogas produced is beneficially used for power and heat generation. A duty-standby flare system and a standby boiler will remain as a backup in the case of engine downtime. Figure 1.32 shows the process flow schematic for this alternative.

Figure 1.32 Alternative 5 - Process Flow Schematic
The specifications for the biogas conditioning skid and their dimensions are indicated in the following Table 1.25.

Table 1.25 Gas Conditioning Skid Specifications
Conditioning
Stage System Quantity Flow Rate(cfm) Media Dimensions(ft, L x W x H) Moisture Removal Knockout Vessel 1 50-350 N/A 5.5 x 3 x 5 Compression Blowers 3 15-300 N/A 10 x 5 x 5
H2S Removal Lead-Lag Vessels 2 up to 780 FerroSorp 8 x 8 x 7 VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-41
Conditioning
Stage System Quantity Flow Rate(cfm) Media Dimensions(ft, L x W x H) Siloxane Removal GAC Vessels 2 up to 780 Calgon VPR 8 x 8 x 12 Gas Storage Pressurized Buffer
Tanks
9 N/A N/A 16 x 4 x 7
The proposed layout and dimension of the system on-site is shown in Figure 1.33.

Figure 1.33 Alternative 5 - Proposed Layout

1.5.6.1 Life Cycle Cost Analysis
The following design parameters were modelled over a 20-year period. The annual electricity production generated for each system was developed using the following baseline criteria in Table 1.26.

Table 1.26 Life Cycle Analysis Criteria - Alternative 5 Parameters Units Values
Estimated Average Biogas Production(1) scfm 158 - 180
Available Energy Input(1) MMBTU/hr 5.7 - 6.4
3 x Capstone 200kW Microturbines (kW) 600
Required Energy Input (at 100% capacity)(1) (MMBTU/hr) 6.4 Required Input DG Flow (at 100% capacity) (cfm) 179
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-42
Parameters Units Values
Electrical Efficiency % 28
Maximum Power Produced kW 580
Parasitic Electrical Power kW 20
Heat Energy Recovered (MMBTU/day) 26-34
Battery Size MWh 3.5
Notes:
(1) A range of values indicates from start of 20-yr period to end of 20-yr period.

As illustrated by the selected parameters and the net demand required by the site (Section 1.2), a sizing of 600 kW is more than the maximum power demand. However, the biogas generated is not sufficient to run this generator at 100 percent capacity.

The capital cost for the microturbines, with a gas conditioning system, a new duty-standby flare system, and a standby boiler was developed using a budgetary cost estimate of the equipment. The cost of the batteries were developed from HOMER software. Indirect costs, contingencies and financial factors presented in Volume 2 of this Master Plan were applied. The capital cost was escalated to 2034 dollars, the starting point of the analysis.

Grants and Incentives
Other assumptions incorporated into this analysis include the incorporation of incentives. The following Table 1.27 lists the incentives available for deployment of microturbines.

Table 1.27 Financial Incentives for Microturbines
Selected Treatment Incentive Qualification? Current Rate(1,2,3) Projected Benefit Microturbines  SGIP
» Base Incentive
» Applied to capital cost of
equipment
Yes 2$ / Watt Not Applied - current
California funding
levels to expire by
2025
Microturbines  SGIP
» Resiliency Adder
» Applied to capital cost of
equipment
No 2.5$ / Watt Not Applied - current
California funding
levels to expire by
2025
Battery Storage  SGIP
» Large Scale Storage
(>10 kW)
» Currently in Step 5
» Applied to capital cost
Yes - 3.5 MWh
system, 4 hour
duration
$ .25 / Watt-hour,
100% for first
2 hours of storage,
50% for hours 2-4
of storage
Not Applied - SGIP
funds not likely to be
available in the 2030s
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-43
Selected Treatment Incentive Qualification? Current Rate(1,2,3) Projected Benefit Battery Storage  ITC
» 6% base credit
» Prevailing wage, low-income community and
domestic content adders
raise the percentage by
10% each
» Applied to capital cost of
equipment
Yes - federal
benefit applicable
to all battery
storage projects

0.18% of capital
cost(4)
$316,000 - funds
expected to be
available until 2033
Notes:
(1) Current rates are subject to state subsidies and incentive programs and may not be applicable in the future. (2) Incentives based on continued compliance performance-based requirements, including efficiency and emissions rates. (3) Incentives based on continued compliance with reporting and monitoring requirements. (4) Assumes domestic content and prevailing wage adders; 26 percent of the capital cost, available for ~70 percent of the total.

1.5.6.2 Results
Figure 1.34 reflects the electrical consumption on the site over the time period. The figure illustrates the net utility purchase required based on net demand, the available electricity produced by the cogeneration, and the net utility purchase required after cogeneration. In this case, the 600 kW microturbine will produce sufficient electricity to make the WWTP self-sufficient by 2054. The WWTP will continue to purchase utility power with this alternative.

Figure 1.34 Alternative 5 - Projected Electrical Consumption VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-44
The available biogas for the microturbine operation is shown. The available biogas under current conditions will never be sufficient for continued utilization of the microturbine. There will be no flaring in this alternative. The amount of available biogas and the corresponding flaring rates for this scenario over twenty years are shown in Figure 1.35.

Figure 1.35 Alternative 5 - Digester Gas End Uses
The Life Cycle cost for this alternative was calculated mainly including the cost of O&M of the equipment.

Figure 1.36 describes the O&M costs for the first year of operation in 2034 dollars.

Figure 1.36 Alternative 5 - Annual O&M Costs
$432,000
$888,000
$80,000
$162,000
$45,000
$79,000
$48,000
$6,000
$18,000
$3,000
$0 $200,000 $400,000 $600,000 $800,000 $1,000,000
Net Annual Cost
Savings from Base Case
Power Cost
O&M costs for microturbine
O&M costs for fuel treatment
Annualized replacement cost for battery
O&M costs for battery
O&M costs for standby boiler
O&M costs for solar
O&M costs for flare
Annual O&M Costs, 2034 dollars
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-45
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined and presented in Table 1.28.

Table 1.28 Life Cycle Cost Analysis – Alternative 5 (600 kW Microturbine) 600kW Microturbine 20-Year Average Annual Cost, 2025 Dollars Estimated Project Cost $24,700,000
20-year Life Cycle O&M Costs $3,100,000
Net Present Cost $27,800,000

1.5.6.3 Construction, Operational, and Regulatory Considerations Operationally, the manufacturer Capstone, offers a renewable 10-year agreement for the microturbines.

The agreement will still require City staff to monitor the system, provide daily inspections of its operation, and perform maintenance on standardized components of the system. However, it excludes City staff from performing planned and corrective maintenance of more integral parts over the span of the agreement. This reduces the burden on City staff.

From a regulatory perspective, microturbines must follow existing BACT guidelines for the APCD. The technologies presented in this analysis were selected to comply with these BACT guidelines. However, the regulatory requirements of installing cogeneration are stringent. It will require significant monitoring and reporting requirements to both state and local agencies. Fuel treatment will be a significant driver of O&M and operational man-hours. Ensuring quality biogas will be essential for the operation of the plant, but may be reduced in reliability.

From a construction standpoint, there is existing space onsite for construction, near to the existing digesters and gas systems. Further, the size of the microturbine system is small and containerized, allowing for smooth integration into the existing system.

1.5.7 Alternative 6: Heat Recovery With Boilers + Compression of Remaining Biogas to CNG for Pipeline Injection + Power Management Using Microgrid and Battery
This alternative evaluates the potential for upgrading excess biogas to pipeline-quality natural gas that can be injected into the closest SoCalGas pipeline. It assumes that the digester biogas will first provide fuel to a new boiler for re-heating the digesters, and then the remainder of the biogas would be utilized for compression and injection into a natural gas pipeline. A new pipeline would be constructed from the WWTP to connect to an existing SoCalGas gas pipeline, and the gas would be sold. A microgrid system connected to the new solar array would remain to manage energy use.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-46
The following process flow schematics indicates the process layout of the proposed alternative (Figures 1.37 and 1.38).

A new waste gas flare would be provided as a backup in case the compressed natural gas does not meet the quality requirements for acceptance into the SoCalGas pipeline.

Figure 1.37 Alternative 6 - Electrical Process Schematic Figure 1.38 Alternative 6 - Biogas Process Schematic

1.5.7.1 Life Cycle Cost Analysis
The assumptions of this analysis are heavily based on shifting market dynamics and the continuation of subsidies and incentives provided to natural gas projects. The assumptions may not remain consistent in the long run.

It is assumed that SoCalGas will purchase the compressed biogas at their procurement price, which changes every month. An average value for CNG sale price is assumed.

The design criteria utilized for this process is shown in Table 1.29.

Table 1.29 Life Cycle Analysis Criteria - Alternative 6 Parameters Units Values
Estimated Average Biogas Production scfm 158 - 180
Available Energy Input MMBTU/hr 4.8 - 6.4
Boiler Heat Recovered MMBTU/hr 1.1 - 1.4
Heat Sent to Pipeline MMBTU/hr 4.56 - 5
Average CNG Sale Price ($/MMBtu) $4
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-47
Parameters Units Values
Gas Sent to Pipeline(1) cfm 127 - 139
Battery Size MWh 3.5
Notes:
(1) Dependent on available pipeline capacity and demand.

Electrically, there is no marginal benefit to this alternative, besides the existing solar array and battery.

Duty and standby boilers will be sufficiently sized to recover the necessary heat for the anaerobic digesters.

The capital cost for the pipeline injection, with a gas conditioning system, and new duty-standby boilers and flares, was developed using a budgetary cost estimate of the equipment. Indirect costs, contingencies and financial factors presented in Volume 2 of this Master Plan were applied. The capital cost was escalated to 2034 dollars, the starting point of the analysis.

Grants and Incentives
Other assumptions incorporated into this analysis include the incorporation of incentives. The following Table 1.30 lists the incentives available for deployment of a pipeline injection.

Table 1.30 Financial Incentives for Pipeline Injection
Selected
Treatment Incentive Qualification? Current Rate(1,2,3) Projected Benefit Pipeline
Injection
 Biomethane Monetary Incentive
Program
» Provides assistance with
interconnection costs and studies
» Provides assistance with some
compression equipment
Yes 50% of estimated
interconnection cost
(~1.925 million)
$965,000
Pipeline
Injection
 SoCalGas Procurement Price
» Purchase price of SoCalGas from
CNG suppliers
Yes $.4/therm or 4$/MMBtu Applied in Life
Cycle Cost
Analysis
Pipeline
Injection
 RFS
» Increased credits for biogas injection
when the end use is transportation
Yes - if CNG fuel
station is the
source of the
biogas

3.4$/RIN Not Applied -
federal benefits
uncertain
Pipeline
Injection
 California LCFS
» Increased credits for biogas injection
when the end use is transportation
Yes - if CNG fuel
station is the
source of the
biogas
60$/MTCO2e Not Applied -
federal benefits
uncertain
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-48
Selected
Treatment Incentive Qualification? Current Rate(1,2,3) Projected Benefit Battery
Storage
 SGIP
» Large Scale Storage (>10 kW)
» Currently in Step 5
» Applied to capital cost
Yes

3.5 MWh system,
4 hour duration
$ .25 / Watt-hour,
100% for first 2 hours of
storage,
50% for hours 2-4 of
storage
Not Applied -
SGIP funds not
likely to be
available in the
2030s
Battery
Storage
 ITC
» 6% base credit
» Prevailing wage, low-income
community and domestic content
adders raise the percentage by 10%
each
» Applied to capital cost of equipment
Yes - federal
benefit applicable
to all battery
storage projects

0.18% of capital cost(4) $316,000 - funds
expected to be
available until
2033
Notes:
(1) Current rates are subject to state subsidies and incentive programs and may not be applicable in the future. (2) Current rate values estimated to be steady and not escalate with inflation to account for market fluctuations. (3) Incentives based on continued compliance with reporting and monitoring requirements. (4) Assumes domestic content and prevailing wage adders; 26 percent of the capital cost, available for ~70 percent of the total.

1.5.7.2 Results
Since this alternative utilizes a battery, the cost per kWh determined by the HOMER section provide the basis of the electrical savings for this alternative.

The net demand for this alternative is based on 502 kW. This corresponds to an annual consumption of ~4,400 MWh per year. Based on the previous determination of battery cost savings per kilowatt-hour with HOMER software, the electrical utility costs were developed.

The average sale price per unit of gas was utilized to calculate the annual revenues of CNG sales to the system. As such, the revenues for the system are based on the core SoCalGas sale price described in Table 1.30 above.

The amount of gas available over the time period for compression is illustrated in Figure 1.39.

Figure 1.39 Alternative 6 - Digester Gas End Uses
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-49
The quantity of gas available for compression ranges from 127 to 139 cfm, based on the standard heating value of methane. Based on the current SoCalGas procurement price of approximately ~$4/MMBtu, the sale revenues can be developed for this alternative.

The Life Cycle cost for this alternative was calculated, including O&M cost of the equipment and power purchase from PG&E. Figure 1.40 describes the O&M costs for the first year of operation in 2034 dollars.

Figure 1.40 Alternative 6 - Annual O&M Costs
Based on the project costs, and the annualized life cycle O&M costs, the Net Present Cost is determined and presented in Table 1.31.

Table 1.31 Life Cycle Cost Analysis - Alternative 6 (Conversion to CNG for Pipeline Injection) Pipeline Injection 20-Year Average Annual Cost, 2025 Dollars Estimated Project Cost $30,000,000
20-year Life Cycle O&M Costs $11,100,000
Net Present Cost $41,100,000
The viability of the Net Present Cost is dependent on multiple factors. First, there must be sufficient demand from both SoCalGas to accept the CNG flow provided by WWTP. Second, it is also dependent on State market pricing for gas, which may not remain at current levels.

1.5.7.3 Operational and Regulatory Considerations
The primary operational consideration for this alternative would be the continued operation of the boiler/flare system in conjunction with an advanced fuel treatment system. This would result in an increase in the operational burden for City staff. There may be opportunities for an external company to VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-50
provide maintenance on the fuel treatment, but that has not yet been considered and may be unlikely without a corresponding recovery benefit.

Further, the natural gas quality limits highlighted under Rule 30 above will necessitate a significant upgrade of the fuel treatment system. If the biogas doesn't reach those standards at any point, the CNG will need to be flared. In addition, gasoline markets for sale in vehicles are tightly regulated, and the monitoring and reporting requirements would correspondingly increase.

For the constructability, there would be significant challenges in constructing a pipeline along Black Road.

The City does not own all the property extending from Black Road to the CNG injection point , and thus would need to acquire property and easement rights. This may pose challenges, considering there are existing utility easements from multiple stakeholders along Black Road, including a State Water Project water pipeline.

Integration of the pipeline within the CNG fuel station is also predicated on the acceptance of the natural gas. If SoCalGas deems there is insufficient demand for CNG, they would be unable to sell the gas at the listed credits. As such, the uncertainty of the markets may make this alternative infeasible.

1.6 Alternative Analysis
The analysis of the alternatives is summarized in Table 1.32. As indicated, Alternative 3 (Gas Engine + Boiler + Solar + Battery) is the only alternative that has a lower Net Present Cost than the Base Case alternative (Alternative 1). Thus, Alternative 3 is the only alternative that shows a financial payback, based on the capital investment and the anticipated savings due to significantly reduced energy purchases from the grid. It is important to note that none of the alternatives include any credit for potential incentive programs. Incentive programs are available, as discussed above during the analysis of each alternative, but have not been included in the financial analysis because such programs come and go, and it is not possible to ascertain what programs might be available if/when one of the alternatives is implemented.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-51
Table 1.32 Alternatives Analysis
Metric Alternative 1 (Base
Case)
Boiler + Solar
Alternative 2
Boiler + Solar +
Battery
Alternative 3
Alt 2 + Gas Engine
Alternative 4
Alt 2 + 400kW-Microturbine
Alternative 5
Alt 2 + 600kW-Microturbine
Alternative 6
Alt 2 + Pipeline
Injection
Capital Cost(1) $13,300,000 $15,100,000 $21,800,000 $23,100,000 $24,700,000 $30,000,000 Net Present Cost(2) $26,500,000 $27,300,000 $24,900,000 $28,800,000 $27,800,000 $41,100,000 Payback Period - - 14 - - -
Flaring Rates 126-139 cfm 126-139 cfm 0-21 cfm 43-68 cfm - 126-139 cfm Notes:
(1) Project Cost, 2025 dollars.
(2) 20-yr average annualized project costs discounted to 2025.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-52

1.6.1 Conclusions and Recommendations

1.6.1.1 Financial
The Net Present Cost gives a direct snapshot about how much each alternative will cost the City to run and operate over the course of the assumed 20-year project lifespan. For this analysis, the comparison of the Net Present Cost shows that the Gas Engine with the battery and microgrid (Alternative 3) is the most financially attractive alternative. Due to its higher efficiency and lower capital cost than the microturbines, it can recoup its capital investment quicker than the microturbine alternatives. Alternative 3 is the only alternative that is more financially viable than the "Boiler and Solar" base case (Alternative 1).

As such, the gas engine is the most financially viable option. The gas engine payback period ultimately means that the savings gained from the reduced power costs will recoup the capital cost after 14 years. As noted earlier, the alternatives do not include any credit for potential incentive programs. Therefore, assuming that some type of incentive program is still available when/if Alternative 3 is implemented, the payback period can be expected to be shorter, making this alternative more attractive.

1.6.1.2 Operational Considerations
To assist with the operational requirements of gas engines or microturbines, maintenance agreements with the equipment manufacturers are available, which would reduce the burden on City staff. Such agreements cover significant engine repairs, but the City will still be required to monitor and repair standard components. The terms for these agreements are typically 10 years and are renewable.

From a regulatory perspective, the gas conditioning skids will be compliant with current ACPD regulations.

However, there will continue to be significant monitoring requirements for each, including annual APCD permits, reports, and calibration. City staff would be expected to monitor and maintain the gas treatment systems surrounding the cogeneration options. This means that the City will be responsible for operational requirements compared to the base case alternative (Alternative 1) or Alternative 2.

The gas engine approach (Alternative 3) will begin to flare about four years into its operation, whereas the 600 kW microturbine will consume all available gas throughout the 20-year life cycle. Changes in biogas production can be accommodated by either system. This allows for ramp-up in energy production in the early years if there is more biogas than projected.

If the City is concerned about the operational burden of either option, the Base Case would reduce those stringent requirements. Although there would be an increased reliance on the grid for providing the bulk of electrical power, minimizing the operational requirements to run the gas conditioning skid and monitoring the cogeneration systems may be more beneficial to the City than the cost savings that can be achieved with a cogeneration alternative.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-53

1.6.1.3 Recommendations
The above analysis was presented to the City during Workshop No. 6 on April 30, 2025. After some discussion, the City felt that there would be significant environmental benefits to utilizing the biogas produced by the future WWTP once the Phase 1 expansion project is complete, thereby significantly reducing the reliance on the electrical grid for plant power needs. Also, based on the financial analysis, Alternative 3 would be the preferred approach.

Therefore, it was recommended that Alternative 3 (635 kW CHP Gas Engine with solar, battery and microgrid) is the preferred alternative and that it should be included as part of the Phase 1 project.

Appropriate incentive programs to reduce the financial burden will be investigated closer to the implementation time.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A ELECTRICAL POWER DRAW

CALCULATIONS
Power Draw Calcs
Phase 1
Phase 1 Power (hp) Remark
Headworks
Screens
conveyor 2 existing size
washer 5
pump 3
Grit Removal
grit pump 8
grit mixer 5 laguna
grit classifier 5 laguna
Primary Clarifiers
Flight drives 3
Skimmer drives 3
Sludge pumps 7.5 added
Aeration Tanks
AB Pump Station
flow, mgd 6.5
flow, gpm 4,514
head, ft 15
efficiency, % 0.7
power, hp 24
Drain pumps 30
Mixers 15
Blowers
average process air, scfm 8,500 based on volume 6 estimation discharge pressure, psig 7
efficiency, % 0.75
power, hp 330
Mech Aerators
power, hp
MLR pumping
flow, mgd 13
flow, gpm 9,259
head, ft 5
efficiency, % 0.7
power, hp 20
Secondary Clarifiers
Flight drives 2 given
Drain pumps 5
RAS pumping
For the following,standard motor sizes are utilized.

As such, the results are rounded up.
flow, mgd 10.0
flow, gpm 6,944
head, ft 30
efficiency, % 0.7
power, hp 75
WAS Pumping
flow, mgd 0.28
flow, gpm 194
head, ft 30
efficiency, % 0.7
power, hp 2
Filters
Filter Influent Pumps
flow, mgd 10
flow, gpm 6,944
head, ft 15
efficiency, % 0.7
power, hp 40
Filter effluent pumps
flow, mgd 10
flow, gpm 6,944
head, ft 30
efficiency, % 0.7
power, hp 75
Filter backwash pumping
flow, mgd 5
flow, gpm 3,472
head, ft 30
efficiency, % 0.7
power, hp 40
Sludge Thickeners
Thickeners 2.55 values based on similarly sized projects Thickened Sludge Pumps 10 values based on existing pumps Polymer Pumps 4 values based on similarly sized projects Drain Pumps 10 values based on similarly sized projects Sludge grinders 2
Anaerobic Digesters
Mixing Pumps 40 values based on similarly sized projects Sludge Transfer Pumps 11 values based on similarly sized projects Recirculation Pump 7.5 based on existing pumps
Sludge Storage
Sludge Transfer Pumps 12 values based on similarly sized projects Recirculation/Hot Water/Gas Mixing
hot water recirculation pumps 5 based on existing pumps, digester 4 gas mixing compressor 30 based on existing compressors
gas chillers/moisture removal 5
Dewatering Building
Screw Press 2.5 values based on similarly sized projects Polymer Metering Pump 1 values based on similarly sized projects Filtrate Pump 20 values based on similarly sized projects Cake Conveyor 10 values based on similarly sized projects Effluent Pump Station to percolation ponds
Effluent Pump Station
Flow, MGD 10 average
Flow, GPM 6940
Head, ft 25
efficiency 0.7
power (hp) 70
Utility Water Pump Station
Flow, MGD 1.5
Flow, GPM 1041
Head, ft 275
efficiency 0.7
power (hp) 110
PROJECT : Santa Maria WWTP Program Management Services
CLIENT: City of Santa Maria
ELEMENT #: 4
DESCRIPTION : Phase 1 Upgrade Electrical Projection
JOB # :

ASSUMPTIONS
Rated Capacity 0.75
1 hp= 0.7457 kW
Safety Factor 1.2
Future Electricity Consumption
No. of
Operating
Units
No. of
Standby
Units
Motor Power
(hp) per unit
Total
Operating
Motor Power
(hP)
Power Input
(KW)
Operation
Time (hr/day)
1 Headworks
Screens 2 1 10 20 15 24
Grit pumps 2 0 8 15 11 12
grit mixer 1 1 5 5 4 24
grit classifier 1 0 5 5 4 24
2 Primary Clarifiers
Flight drives 2 1 2 4 3 24
Skimmer drives 2 1 2 4 3 24
Sludge pumps 2 1 7.5 15 11 24
3 Aeration Basin
AB influent Pumps 3 1 24 73 55 24
Mixers 6 0 15 90 67 24
Blowers 2 1 330 660 492 24
Drain Pumps 1 0 30 30 22 1
MLR Pumping 3 0 20 60 45 24
4 Secondary Clarifiers
RAS pumping 2 1 75 150 112 24
WAS pumping 2 0 2 4 3 5
mechanism drives 2 0 2 4 3 5
5 Tertiary Filters
Filter influent pumps 1 1 40 40 30 24
Filter backwash pumping 1 1 40 40 30 2
6 Primary Scum
Scum Pumps 2 1 15 30 22 0.1
8 Secondary Scum
Process Normal Operations
Scum Pumps 2 1 10 20 15 0.1
9 Sludge Thickening
Thickeners 3 1 3 9 7 7
Thickened Sludge Pumps 2 1 10 20 15 7
Polymer Pumps 3 1 4 12 9 7
Drain Pumps 1 1 10 10 7 7
Sludge grinders 1 1 2 2 1 8
10 Anaerobic Digestion
Mixing Pumps 2 2 20 40 30 24
Sludge Transfer Pumps 2 1 11 22 16 7
Reciculation Pump 2 1 7.5 15 11 8
11 Sludge Storage
Sludge Transfer Pumps 1 1 12 12 9 7
Sludge mixing Pump 1 1 40 40 30 24
12 Dewatering Building
Screw Press 3 1 2.5 8 6 7
Polymer Metering Pump 3 1 1 3 2 7
Filtrate Pump 1 1 20 20 15 7
Cake Conveyor 3 0 10 30 22 7
13) Gas Mixing/Boilers
hot Water recirculation pumps 2 2 5 10 7 8
gas chillers/moisture removal 1 1 5 5 4 8
14) Effluent Pump Station
Finish water pump 1 1 70 70 52 24
15) Utility Water Pump Station 1 1 110 110 82 24
16) HVAC/Process/Misc 396.63 18
Connected Load (kW) 1670
AVERAGE DEMAND FACTOR 40%
Expected Average Daily Demand (kW) 668
Annual Consumption (MWh) 5851
VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX B HOMER REPORT
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 1 of 13 ends

Distributed
Generation
Proposal
PREPARED FOR:

City of Santa Maria, Wastewater Treatment Plant
751 Black Rd, Santa Maria, CA 93458, USA
PREPARED BY:

Tobias Pizot, Staff Professional
Carollo Engineers, [email protected]
3609094857
This proposal has been generated using HOMER Grid, a dynamic software engine that runs complex simulations and sensitivity analyses with your energy data. It evaluates thousands of variables to compare value streams, assess system options, and provide risk-mitigation and cost reduction strategies. Originally developed at the US Department of Energy’s National Renewable Energy Laboratory, the HOMER software is a risk-mitigation tool trusted by over 200,000 project developers and financial institutions to produce informed economic feasibility studies, system design and engineering insight, as well as energy cost savings.

Table of Contents
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 2 of 13 ends

Project Summary......................................................................................3 About Carollo Engineers .........................................................................4 Savings Summary ....................................................................................5 Savings Details.........................................................................................6 Consumption Summary...........................................................................7 Engineering Details..................................................................................8 Cashflow Section ...................................................................................10 Utility Bill Details....................................................................................11 Glossary Section....................................................................................12 HOMER Energy Section.........................................................................13 Carollo Engineers
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 3 of 13 ends

CURRENT SYSTEM
The electric needs of 751 Black Rd, Santa Maria, CA 93458, USA are met with a grid connection and 720 kW of PV. You currently spend $757,101 on your utility bill per year. 41% of your utility bill is demand charges.

PROPOSED SYSTEM
We propose adding 720 kW of PV and 3,421 kWh of battery capacity.

ABOUT CAROLLO ENGINEERS
Carollo Engineers is a consulting firm that specializes in water and wastewater engineering.

We focus on designing and implementing solutions for water treatment, wastewater treatment, water reuse, and infrastructure management.

Our work includes:

Water Treatment – Designing facilities to provide clean drinking water.

Wastewater Treatment – Developing systems to treat and safely discharge wastewater.

Water Reuse & Desalination – Finding ways to recycle water and remove salt for fresh water supply.

Stormwater Management – Controlling and treating runoff to prevent flooding and pollution.

Savings Summary
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 4 of 13 ends

The chart summarizes down your estimated annual savings in the following categories:

1. Demand: Savings from demand charge reduction

2. Energy: Consumption reduction and self-consumption

3. O&M: Operating and maintenance costs of the proposed components

4. Replacements: Cost to replace proposed system components over the project lifetime

5. Other: Cost differences not included in the other categories

6. Total: The total savings (annualized) of the proposed system Savings Details
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 5 of 13 ends

1. Utility Bill Savings
The facility at 751 Black Rd, Santa Maria, CA 93458, USA is served by Pacific Gas & Electric Co. The electricity tariff plan you are currently on is the Large General - Time of Use, Option S (NEM 3).

Your monthly electricity bill has two main parts:
1) Energy charges for the total amount of electricity you consume. 2) Demand charges—for “peak usage.” If your facility tends to use a lot of power over short periods, your demand charges will comprise a larger part of your bill. If you use power at a more consistent rate throughout the month, your demand charges will generally comprise a smaller part of your bill. Demand charges make up a significant portion of commercial and industrial customers’ total electricity costs: typically, between 30 and 70 %.

Your annual utility bills and savings by category:

Consumption
Charge Demand Charge Fixed Rate Total
Base Case $445,138 $307,859 $4,105 $757,101
Proposed Case $445,138 $188,012 $4,105 $637,254
Annual Savings $0.00 $119,846 $0.00 $119,847
Current System: Grid-Connection and Solar
Proposed System: Grid-Connection, Solar, Generator, and Storage Consumption Summary
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 6 of 13 ends

Electric Consumption
This facility uses 12250 kWh/day and has a peak of 946 kW. In the proposed system, the following generation sources serve the electrical load. 0 67
133
200
267
333
400
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Utility
Imported PV
Production (MWh)
Engineering Details
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 7 of 13 ends

PV: Imported PV Production
The Generic PV system has a nominal capacity of 720 kW. The annual production is 1,649,542 kWh/yr.

Rated Capacity 720 kW Total Production 1,649,542 kW
Specific Yield 2,291 kWh/kW LCOE 0 $/kWh
PV Penetration 36.9 %
Hour of Day
Day of Year
kW
Engineering Details
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 8 of 13 ends

Storage: Generic 1kWh Li-Ion [ASM]
The Generic storage system's nominal capacity is 3,421 kWh. The annual throughput is 962,852 kWh/yr.

Rated Capacity 3,421 kWh Expected Life 9.22 yr
Annual Throughput 962,852 kWh/yr Capital Costs $1.74M
Maintenance Cost 34,800 $/yr Losses 82,904 kWh/yr
Autonomy 4.69 hr
The following incentives improve the economics for Storage. Hour of Day Day of Year
%
Engineering Details
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 9 of 13 ends

Converter: System Converter
Capacity 720 kW Hours of Operation 4,352 hrs/yr
Mean Output 176 kW Energy Out 1,541,603 kWh/yr
Minimum Output 0 kW Energy In 1,622,740 kWh/yr
Maximum Output 720 kW Losses 81,137 kWh/yr
Capacity Factor 24.4 %
Hour of Day
Day of Year
kW
Cash Flows
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 10 of 13 ends

Project Lifetime 20 years Expected Inflation Rate 3.7%
Nominal Discount Rate 6.0% Real Interest Rate 2.2%
Year 1 2 3 4 5 6 7 8 9 10
Generic 1kWh Li-Ion [ASM] ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) Investment Tax Credit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Large General - Time of Use,
Option S (NEM 3)
($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) Year 11 12 13 14 15 16 17 18 19 20
Generic 1kWh Li-Ion [ASM] ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) ($34,800) Investment Tax Credit $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Large General - Time of Use,
Option S (NEM 3)
($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) ($528,185) Utility Bill Details
PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 11 of 13 ends

Utility Monthly Summary - Current System
Month Energy
Purchased
(kWh)
Energy
Sold
(kWh)
Net
Energy
Purchased
(kWh)
Peak
Load
(kW)
Energy
Charge
Demand
Charge
Demand
Response
Fixed
Charge
Minimum
Charge
Taxes Total
January 326,481 0 326,481 946 $27,159 $19,639 $0.0 $348.58 $0.0 $0.0 $47,146 February 288,232 0 288,232 946 $23,990 $19,639 $0.0 $314.85 $0.0 $0.0 $43,943 March 311,317 0 311,317 946 $25,024 $19,639 $0.0 $348.61 $0.0 $0.0 $45,011 April 297,330 0 297,330 946 $23,647 $19,580 $0.0 $337.37 $0.0 $0.0 $43,564 May 302,069 0 302,069 946 $24,027 $19,580 $0.0 $348.61 $0.0 $0.0 $43,956 June 290,501 0 290,501 946 $58,893 $37,731 $0.0 $337.37 $0.0 $0.0 $96,961 July 301,993 0 301,993 946 $60,444 $37,731 $0.0 $348.61 $0.0 $0.0 $98,524 August 305,037 0 305,037 946 $61,804 $37,731 $0.0 $348.60 $0.0 $0.0 $99,884 September 299,062 0 299,062 946 $60,773 $37,731 $0.0 $337.36 $0.0 $0.0 $98,842 October 317,914 0 317,914 946 $25,594 $19,580 $0.0 $348.60 $0.0 $0.0 $45,523 November 313,404 0 313,404 946 $26,204 $19,639 $0.0 $337.35 $0.0 $0.0 $46,180 December 331,387 0 331,387 946 $27,580 $19,639 $0.0 $348.59 $0.0 $0.0 $47,567 Annual 3,684,727 0 3,684,727 946 $445,138 $307,859 $0.0 $4,105 $0.0 $0.0 $757,101 Utility Monthly Summary - Proposed System
Month Energy
Purchased
(kWh)
Energy
Sold
(kWh)
Net
Energy
Purchased
(kWh)
Peak
Load
(kW)
Energy
Charge
Demand
Charge
Demand
Response
Fixed
Charge
Minimum
Charge
Taxes Total
January 326,481 0 326,481 946 $27,159 $11,961 $0.0 $348.58 $0.0 $0.0 $44,285 February 288,232 0 288,232 946 $23,990 $11,947 $0.0 $314.85 $0.0 $0.0 $41,178 March 311,317 0 311,317 946 $25,024 $11,803 $0.0 $348.61 $0.0 $0.0 $40,962 April 297,330 0 297,330 946 $23,647 $11,814 $0.0 $337.37 $0.0 $0.0 $49,886 May 302,069 0 302,069 946 $24,027 $11,765 $0.0 $348.61 $0.0 $0.0 $39,941 June 290,501 0 290,501 946 $58,893 $23,074 $0.0 $337.37 $0.0 $0.0 $74,601 July 301,993 0 301,993 946 $60,444 $23,074 $0.0 $348.61 $0.0 $0.0 $77,616 August 305,037 0 305,037 946 $61,804 $23,095 $0.0 $348.60 $0.0 $0.0 $78,304 September 299,062 0 299,062 946 $60,773 $23,009 $0.0 $337.36 $0.0 $0.0 $78,526 October 317,914 0 317,914 946 $25,594 $12,083 $0.0 $348.60 $0.0 $0.0 $37,611 November 313,404 0 313,404 946 $26,204 $12,179 $0.0 $337.35 $0.0 $0.0 $37,126 December 331,387 0 331,387 946 $27,580 $12,208 $0.0 $348.59 $0.0 $0.0 $37,218 Annual 3,684,727 0 3,684,727 946 $445,138 $188,012 $0.0 $4,105 $0.0 $0.0 $637,254 PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 12 of 13 ends

Glossary Section
Annualized Savings
The difference in annualized cost between the base case system and the proposed system.

The annualized cost is the cost that, if it were to repeat in every year of the project lifetime, would give the same net present cost as the actual cash flow sequence.

Capital Investment
The capital investment is the additional installed cost of the proposed system relative to the base case system at the start of the project.

Internal rate of return
Internal rate of return (IRR) is the discount rate at which the base case and proposed system have the same net present cost. HOMER calculates the IRR by determining the discount rate that makes the present value of the difference of the two cash flow sequences equal to zero.

Net Present Cost
The total net present cost (NPC) of a system is the present value of all the costs the system incurs over its lifetime, minus the present value of all the revenue it earns over its lifetime.

Costs include capital costs, replacement costs, O & M costs, fuel costs, emissions penalties, and the costs of buying power from the grid. Revenues include salvage value and grid sales revenue. HOMER calculates the total NPC by summing the total discounted cash flows in each year of the project lifetime.

Net Present Value
Net Present Value (NPV), also referred to as net present worth, is the difference between the net present costs of the base case system and the proposed system.

Return on Investment
Return on Investment (ROI) is the yearly cost savings relative to the initial investment. The ROI is the average yearly difference in nominal cash flows over the project lifetime, divided by the difference in capital cost.

Simple payback
Simple payback is the number of years at which the cumulative cash flow of the difference between the proposed system and base case system switches from negative to positive.

The payback is an indication of how long it would take to recover the difference in investment costs between the proposed system and the base case system.

Total Annualized Cost
Total Annualized Cost is the annualized value of the total net present cost. The annualized cost of a component is the cost that, if it were to occur equally in every year of the project lifetime, would give the same net present cost as the actual cash flow sequence associated with that component. HOMER calculates annualized cost by first calculating the net present cost, then multiplying it by the capital recovery factor.

PREPARED BY:

Tobias Pizot,
Staff Professional, Carollo Engineers,
[email protected],
3609094857

Page 13 of 13 ends

HOMER Energy

ABOUT HOMER ENERGY
HOMER software is used by
more than 200,000 users in
193 different countries.

HOMER Energy is the world’s leading microgrid modeling software company. The Hybrid Optimization of Multiple Energy Resources (HOMER) software helps engineers and project developers navigate the complexities of designing cost-effective and reliable microgrids that combine traditional and renewable generation sources.

HOMER evaluates thousands of variables to compare value streams, assess system options, and provide risk-mitigation and cost reduction strategies. The software includes hundreds of preconfigured components to offer detailed insight, while addressing the modeling requirements of all major microgrid segments.

HOMER software is utilized by over 200,000 users in 193 countries and is trusted by governments, financial institutions, military agencies, utilities, energy systems integrators, and NGOs to design hybrid power systems. In the last decade, HOMER has demonstrated its effectiveness for analyzing complex distributed energy systems, including grid-tied hybrid renewable microgrids and situations where the grid is insufficiently reliable, such as islands and remote communities.

ABOUT HOMER GRID
HOMER Grid is a powerful software solution for modeling hybrid energy systems and evaluating options to reduce electricity expenditures. It is a robust tool that combines engineering and economics information in one comprehensive model while rapidly performing complex calculations to determine the value of self-consumption, demand charge reduction, and energy arbitrage.

HOMER Grid allows users to compare multiple components and design outcomes, identify points at which different technologies become cost-competitive, and consider options for minimizing project risk and determining the most economic design. With integrated access to more than 20k tariffs in the US, Canada, and Mexico, and the ability to model any tariff, HOMER Grid simulates real-world performance to deliver informed choices for system design and optimization.

VOLUME 9 / CHAPTER 1: ENERGY MANAGEMENT
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX C FINANCIAL ASSUMPTIONS AND PROCESS

ASSUMPTIONS

FINANCIAL

ASSUMPTION VALUE UNIT REMARK
Present worth Year 2034end of evaluation 2054Inflation (capital) 3.7%Inflation (electricity) 3.7%Inflation (natural gas) 3.7%Inflation (O&M costs) 2.0% inflation applied once in 10 years due to fixed maintenance contractsGross discount rate 6%Digester Gas LHV, 600 btu/scfEngine availability 88%Turbine availability 88%Parasitic Power 5%O&M cost for gas engine $0.035 $/kWh based on quoted maintenance contracts and Riverside DG Life Cycle CostO&M cost for solar $0.011 $/kWhO&M cost for battery battery O&M cost done by HOMERO&M rate for microturbine $0.030 $/kWh based on quoted maintenance contracts and Riverside DG Life Cycle CostO&M rate for fuel treatment $0.900 $/mmBTU based on Riverside Life Cycle cost analysisO&M rate for flare $85.00 $/cfm based on existing costsO&M rate for fuel treatmentAve Natural gas sale price 0.40 $/therm quoted price from SoCalGas resourcesAve Natural gas sale price $4.0 $/mmBTU PROCESS PROJECTIONS Current Phase 1 End of Phase 1 Remark Year 2024 2034 2054 from Vol. 2Plant Flow (mgd) 7.5 8.5 9.9 from Vol. 2 and vol. 3 TWAS loading increaseGas production (scfd) 162000 227000 267000 accounts for ramp up in flow, switch from trickling filter to Activated Sludge increase production, BioWin Process ModelGas production (scfm) 112.5 157.6 185.4Average plant heat load (mmBTU/hr) 0.888 1.11 1.53 95% boiler efficiency, 2024 values assume 2 digesters in operation, 2054 value assumes all 3 in operation (25.3 mmBTU - 34.8 mmBTU)Peak heat load (mmBTU/hr) 1.136 1.42 1.95 peak heat value of 1.28 derived from existing digester dataAve. Electric usage - no solar (kWh/d) 5624 16440 16440Average electrical demand (kW) 234 685 685 flow weighted, demand remains steady over timePeak.Electrical demand (kW) 300 946 946 1.3x average, demand remains steady over timeAverage solar demand reduction (kW) - 183 183 calculated with NREL and HOMER grid softwareAverage electrical demand w/solar (kW) - 502 502 calculated with NREL and HOMER grid software

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 10: Air Quality and
Emissions Odor Control
FINAL / October 2026

CITY OF SANTA MARIA
Wastewater Treatment Plant Master Plan
Volume 10: Air Quality and
Emissions Odor Control
FINAL / October 2026
Digitally signed by Graham J.G. Juby
Contact Info: Carollo Engineers, Inc.

Date: 2026.10.24 11:23:18-07'00'
VOLUME 10 / AIR QUALITY AND EMISSIONS ODOR CONTROL
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN i
pw://Carollo/CA/Santa Maria/202301-000000/03 Reports and Studies/02 Deliverables/Master Plan/Volume 10/_Cover_TOC_Abbrevs_AppxCovers.docx Contents
CHAPTER 1 AIR QUALITY EMISSIONS

1.1 Introduction 1-1

1.2 Background 1-1

1.2.1 Federal 1-1

1.2.2 State 1-2

1.2.3 Local 1-2

1.3 Facilities Impacting Air Quality 1-3

1.3.1 Existing Facilities Impacting Air Quality 1-3

1.3.2 Future Facilities Impacting Air Quality 1-4

1.4 Facilities Impacting Odor 1-7

1.4.1 Existing Facilities Impacting Odor 1-7

1.4.2 Future Facilities 1-9
CHAPTER 2 PERMITTING PLAN

2.1 Introduction 2-1

2.2 Permits Requiring Modification 2-1

2.2.1 Central Coast Regional Water Quality Control Board 2-1

2.2.2 Biosolids 2-2

2.3 New Permits Required for Future Expansion 2-3

2.3.1 City of Santa Maria Community Development Department 2-3

2.3.2 Santa Barbara County Air Pollution Control District 2-3

2.3.3 Santa Barbara County Environmental Health Services Certified Unified Program Agency 2-5

2.3.4 State Water Resources Control Board 2-5

2.3.5 State of California Department of Industrial Relations Division of Occupational Safety and Health 2-6

2.3.6 Post Construction Additional Permits and Programs 2-6

2.3.7 Pretreatment Program 2-7

2.3.8 SWRCB Environmental Laboratory Accreditation Program 2-7

2.4 Permitting Plan Summary 2-7
Appendices

APPENDIX A EXISTING SANTA MARIA WWTP PERMITS
Tables
Table 1.1 Santa Maria Permit Potential to Emit Limits - Tons Per Year 1-3 Table 1.2 Flares and Boiler No. 1 Permitted Flows 1-4
Table 1.3 City WWTP SBCAPCD Permits Required for Expansion 1-7 VOLUME 10 / AIR QUALITY AND EMISSIONS ODOR CONTROL
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN ii
Table 1.4 Planning Level Cost for Odor Control Improvements 1-15 Table 2.1 Permitting Plan for Santa Maria WWTP Expansion Program 2-8 Figures
Figure 1.1 Facilities Impacting Air Quality 1-6
Figure 1.2 Existing Facilities Contributing to Odor 1-8 Figure 1.3 Phase 1 Expansion Odor Control Strategy - Reuse Primary Trickling Filter No. 2 1-11
Figure 1.4 Phase 1 Expansion Odor Control Strategy - Option to Construct a New TF Pump Station 1-12
Figure 1.5 Phase 2 WWTP Facilities Layout 1-14
Figure 2.1 Permitting Schedule for Phase 2-11
VOLUME 10 / AIR QUALITY AND EMISSIONS ODOR CONTROL
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iii
Abbreviations
APCD Air Pollution Control District
ATC Authority to Construct
BACT Best Available Control Technology
BMP Best Management Practices
BOD biochemical oxygen demand
CAA Clean Air Act
CAAQS California Ambient Air Quality Standards
Cal/OSHA California Division of Occupational Safety and Health CARB California Air Resources Board
CBC California Building Code
CEQA California Environmental Quality Act
CERS California Environmental Reporting System
CFR Code of Federal Regulations
CH4 methane
CHP combined heat and power
City City of Santa Maria
CO carbon monoxide
CO2 carbon dioxide
Cogen cogeneration
CUPA Certified Unified Program Agency
E&G Engel & Gray, Inc.

EHS Environmental Health Services
ELAP Environmental Laboratory Accreditation Program
EPA Environmental Protection Agency
H2S hydrogen sulfide
HMBP Hazardous Materials Business Plan
IGP Industrial General Permit
mgd million gallons per day
mmBTU million British Thermal Units
MS4 Municipal Separate Storm Sewer Systems
N/A not applicable
NAAQS National Ambient Air Quality Standards
NESHAP National Emissions Standards for Hazardous Air Pollutants NOx nitrogen oxides
NOA Notice of Applicability
NOI Notice of Intent
PCR Post Construction Requirement
VOLUME 10 / AIR QUALITY AND EMISSIONS ODOR CONTROL
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN iv
PM particulate matter
ppmv parts per million as volume
PTO Permit to Operate
ROC reactive organic compounds
ROWD Report of Waste Discharge
RWQCB Regional Water Quality Control Board
SBCAPCD Santa Barbara County Air Pollution Control District scf standard cubic feet
scfm standard cubic feet per minute
SMARTS Stormwater Multiple Application and Report Tracking System SOx sulfur oxides
SWCP Stormwater Control Plan
SWPPP Stormwater Pollution Prevention Plan
SWRCB State Water Resource Control Board
TNI The NELAC Institute
VAR vector attraction reduction
VOC volatile organic compound
WDR Waste Discharge Requirements
WWTP wastewater treatment plant
VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-1
CHAPTER 1 AIR QUALITY EMISSIONS

1.1 Introduction
Wastewater treatment plants (WWTPs) contribute significantly to meeting the statewide air quality targets; therefore, it is important for the City of Santa Maria's (City) WWTP to maintain compliance with all applicable air quality regulations. As the WWTP expands, managing air emissions and odors becomes increasingly important to comply with regulatory requirements and maintain positive community relations. This chapter outlines existing and future facilities and processes at the City's WWTP that impact air quality, regulatory context, and expected permitting requirements for the expansion of the WWTP. This chapter will also identify both existing and future odor sources and identify odor control strategies should these be needed as the plant expands in the future.

1.2 Background
The City's WWTP provides wastewater treatment services to residents and commercial dischargers and provides septage receiving services for the community and the surrounding area. The WWTP consists of septage receiving, headworks, primary clarifiers, primary trickling filters, an intermediate clarifier, secondary trickling filters, secondary clarifiers, percolation ponds, thickeners, digesters, and sludge drying beds. The WWTP operates under several environmental permits, including those issued by the Santa Barbara County Air Pollution Control District (SBCAPCD). Existing SBCAPCD permits primarily govern criteria pollutant emissions from combustion equipment and odor control systems. Facility upgrades and expansion efforts may require modifications to existing permits and trigger new permitting requirements based on emissions thresholds and control technologies. The following subsections provide an overview of current regulations on criteria pollutants at the federal, state, and local levels. For additional information regarding regulatory setting and overview, refer to Volume 2, Chapter 4 - Regulatory Considerations.

1.2.1 Federal
At the federal level, the Environmental Protection Agency (EPA) establishes and enforces the federal regulations that govern air emissions generated by the Santa Maria WWTP facilities. Most of the regulations impacting WWTP air emissions are based on the Clean Air Act (CAA). The CAA creates a comprehensive national framework designed to protect ambient air quality by limiting air emissions for both stationary and mobile sources. The CAA primarily regulates six common air pollutants, which are referred to as "criteria air pollutants." Per the CAA, the EPA establishes National Ambient Air Quality Standards (NAAQS) for the six criteria pollutants to protect human health and welfare. These standards are codified in 40 Code of Federal Regulations (CFR) Part 50, National Primary and Secondary Ambient Air Quality Standards, or NAAQS. The six criteria pollutants are:
 Ozone.
 Particulate matter (PM) (PM10 and PM2.5).
 Lead.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-2
 Carbon monoxide (CO).
 Sulfur oxides (SOx).
 Nitrogen oxides (NOx).

1.2.2 State
At the state level, the California Air Resources Board (CARB) develops statewide policy and regulations for the protection of public health from the effects of air pollution and enforces federal regulations to meet minimum air quality standards. The EPA requires states to adopt and enforce plans to achieve the NAAQS.

As such, CARB has set California Ambient Air Quality Standards (CAAQS) to enforce the NAAQS for the six criteria pollutants as well as four additional pollutants. The four additional pollutants include:
 Hydrogen sulfide (H2S).
 Sulfate.
 Vinyl chloride.
 Visibility-reducing particles (i.e., particles that reduce visibility for airport safety, scenic enjoyment, road safety, etc.).

1.2.3 Local
Air regulations are implemented locally by the SBCAPCD, which ensures compliance to safeguard air quality in the region. The local air districts regulate emissions from factories, industrial facilities, and other stationary sources, such as combustion engines, boilers, and flares at WWTPs. Additionally, the local air districts provide permitting, air quality attainment planning, rulemaking, air quality monitoring, and incentive programs.

There are two primary types of air quality permits applicable to WWTPs: the Permit to Operate (PTO) and the Authority to Construct (ATC). The PTO authorizes the operation of equipment that emits pollutants and requires renewal every three years. For instance, the PTO for the City's WWTP, identified as PTO No. 08390-R11, is reevaluated triennially, with the most recent review conducted in September 2024.

The ATC permits the construction of new equipment or the modification of existing equipment that will emit pollutants and is renewed as needed based on the project's timeline.

The PTO comes with stringent requirements to ensure ongoing compliance with emission standards. This includes specific limits on pollutants such as NOx, CO, SOx, PM10, and PM2.5, which are discussed below.

There are also operational restrictions, including the volume of digester gas and propane that can be burned daily. The permit mandates proper maintenance and operation of equipment, and strictly prohibits the venting of digester gas except under breakdown conditions.

Monitoring and recordkeeping are essential components of compliance. Daily monitoring of digester gas and propane volumes combusted must be conducted using calibrated flow meters. Detailed records must be maintained, including daily volumes of fuel used, maintenance logs, and instances of leaks or H2S alarms. Additionally, annual reports documenting compliance with permit conditions must be submitted by March 1 of each year. These reports include data on emission levels, fuel usage, and any corrective actions taken. Compliance and enforcement mechanisms are in place to ensure adherence to the permit conditions. This includes the implementation of an SBCAPCD-approved Inspection and Maintenance Plan, which details procedures for detecting and repairing leaks, maintaining equipment, and ensuring VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-3
compliance with emission thresholds. Biennial source testing of emissions and process parameters is also required to verify compliance with emission standards.

1.3 Facilities Impacting Air Quality
The Santa Maria WWTP has several facilities that impact air quality and require Air Pollution Control District (APCD) PTOs. This section summarizes the existing facilities that impact air quality and the existing APCD permit. Additionally, the expansion of the WWTP will include new and modified facilities that will impact air quality and require new PTOs and ATCs. This section also details future facilities planned as part of the expansion that will impact air quality and require new or modified APCD permits.

1.3.1 Existing Facilities Impacting Air Quality
Existing flares, digesters, and boilers at the City's WWTP impact air quality and require PTOs from the SBCAPCD. The City operates anaerobic digesters to treat its biosolids, generating methane (CH4) and carbon dioxide (CO2) during the digestion process. A portion of the biogas is burned in a boiler to make hot water for heating the digesters, and the remainder of the gas is flared. Boiler No. 1, the primary boiler, burns digester gas with propane gas as a backup, while the standby unit (Boiler No. 2) burns only propane gas and is exempt from regulations. There are two waste flares equipped with a pilot flare and fueled by propane gas as a back-up. An iron sponge scrubber is also a part of the system to remove hydrogen sulfide in the produced gas ahead of the boilers and flares.

The local regulations, enforced by the SBCAPCD, take into account the state and federal rules on criteria and hazardous pollutants. The existing permit to operate the flares, digesters, and boilers onsite is PTO No. 08390-R11. The permit regulates the amount of criteria pollutants and the quantity of fuel that may be burned. Table 1.1 lists the permit potential to emit for recognized air quality pollutants under PTO No. 08390-R11.

Table 1.1 Santa Maria Permit Potential to Emit Limits - Tons Per Year Equipment NOx ROC CO SOx PM PM10 PM2.5 Maximum Fuel Input (mmBTU/hour)
Flare 1 1.38 1.75 7.5 4.55 0.41 0.41 0.41 4.63
Flare 2 3.56 4.52 19.37 11.74 1.05 1.05 1.05 12.0
Flare 1 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Flare 2 (pilot) 0.03 0.04 0.15 0.05 0.01 0.01 0.01 0.095 Boiler (digester gas) 0.4 0.06 3.26 2.46 0.08 0.08 0.08 2.51 Boiler (propane) 0.4 0.06 3.26 0.18 0.08 0.08 0.08 Exempt Iron Sponge Scrubber - 0.01 - - - - - -
Total 4.02 4.66 22.94 14.30 1.15 1.15 1.15 N/A
Notes:
mmBTU - million British Thermal Units; N/A - not applicable; ROC - reactive organic compounds In addition to the limits, H2S is continuously monitored using an ambient monitoring system. H2S concentrations are reduced because of the iron sponge scrubbing and ferrous chloride injection system.

The current limit for H2S at atmospheric conditions is 796 parts per million as volume (ppmv).

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-4
The typical daily average concentration of H2S in the treated biogas in 2023, downstream of the iron sponge, was well below the limit, at 197 ppmv.

In addition to the maximum fuel input shown, there are maximum volume limits for monthly digester gas production and for propane gas for boilers and flares.

The permit stipulates the maximum biogas flow to each flare and Boiler No. 1, as shown in Table 1.2.

The total average biogas production in 2023 was 161,335 standard cubic feet (scf) per day. Typical biogas usage in Boiler No. 1 in 2023 was 35,400 scf per day. The combined energy that the flares can burn each day is 291.5 mmBTU per day.

Table 1.2 Flares and Boiler No. 1 Permitted Flows
Equipment SCF per Day SCFM
Flare 1 185,200 128.6
Flare 2 293,000 203.5
Flare 1+2 Pilots (propane) 1800 1.25
Boiler 1 Max Flow (digester gas) 100,000 69.4
Boiler 1 Max Flow (propane) 24,000 16.6
Notes:

SCFM - standard cubic feet per minute
Stringent monitoring is required for the system; annual reports are due to the SBCAPCD with information regarding waste gas production, flaring, and H2S concentrations.

1.3.2 Future Facilities Impacting Air Quality
The expansion of the City's WWTP includes modification of existing facilities and new facilities that impact air quality and will require new permits from the SBCAPCD. The Phase 1 Expansion requires a total of three anaerobic digesters. At least one additional anaerobic digester will be constructed as part of the Phase 1 project, and two of the existing digesters, Digester No. 1 and Digester No. 4, will either be rehabilitated and used as an anaerobic digester or converted to a sludge storage tank, depending on their condition. This would mean that biogas flaring and utilization of biogas as a boiler fuel would continue.

However, due to the age of existing components and the potential for stricter criteria pollutant laws, new methane boilers and waste gas flares will be constructed in Phase 1 of the project. As such, the criteria pollutants regulated under the existing permit would remain in effect, but a new SBCAPCD permit would be required.

Also planned as part of the WWTP expansion to meet the plant's proposed power and heating demands is a new co-generation facility. Further detailed in Chapter 1 of Volume 9 of the Master Plan, a combined heat and power combustion engine will be included as part of Phase 1 of the project and will produce heat for use in the anaerobic digesters and electricity for use at the facility. The gas will be treated before entering the system to maintain high engine performance standards and meet APDC requirements for exhaust emissions. The exhaust heat from the gas engines will be recovered and used for anaerobic digesters heating, and a duty-standby flare and a standby boiler will remain as a backup in the case of engine downtime. Permitting a gas engine in Santa Barbara County must follow existing Best Available Control Technology (BACT) guidelines for the APCD. There would be a large degree of monitoring and compliance tasks to maintain compliance with the permits. The gas conditioning skids will be compliant VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-5
with current APCD regulations and will have significant monitoring requirements, including annual APCD permits, reports, and calibration. Figure 1.1 highlights existing facilities that impact air quality and will require updates to the existing APCD permit, and new facilities that will require new permits. This information is also detailed in Table 1.3.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-6
Figure 1.1 Facilities Impacting Air Quality
VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-7
Table 1.3 City WWTP SBCAPCD Permits Required for Expansion Facilities Type of APCD Permit Required in Phase 1 Required in Phase 2 Flare 1 PTO Update Update
Flare 2 PTO Update Update
Flare 1 (pilot) PTO Update Update
Flare 2 (pilot) PTO Update Update
New Boiler ATC New Not Required
New Boiler PTO New Update
Iron Sponge Scrubber PTO Update Update
CHP Engine(1) ATC New Not Required
CHP Engine(1) PTO New Update
Waste Gas Flare ATC New Not Required
Waste Gas Flare PTO New Update
Notes:

CHP - combined heat and power
(1) BACT evaluation required.

1.4 Facilities Impacting Odor
Effective odor management is essential to the operation of the City WWTP. Odors generated from various treatment processes can lead to regulatory scrutiny and neighbor complaints if not properly controlled.

This section identifies current and future odor sources at the facility and evaluates future odor control strategies.

1.4.1 Existing Facilities Impacting Odor
Several existing treatment processes at the WWTP are known contributors to odor emissions, particularly during warmer months or periods of high organic loading. The facilities listed below and highlighted in Figure 1.2 are open to the atmosphere, allowing for the release of volatile organic compounds (VOCs), hydrogen sulfide (H2S), and other odorous compounds.
 Septage Receiving Station:
» High-strength loads contribute to strong odors.
 Headworks:
» Raw influent with turbulent flow can release VOCs and H2S.  Grit Chamber:
» Uncovered and allows for escape of odorous compounds.  Primary Clarifiers:
» Uncovered and allows for escape of odorous compounds.  Gravity Sludge Thickeners:
» Uncovered and allows for the escape of odorous compounds from primary sludge.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-8
Figure 1.2 Existing Facilities Contributing to Odor
VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-9
Currently, there are no odor control facilities at the WWTP. The plant is surrounded by agricultural processes and no residential areas, so there has not been a need for odor control facilities.

1.4.2 Future Facilities
As part of the plant's long-term odor management approach, both Phase 1 and Phase 2 expansion efforts will incorporate upgrades to reduce and control odor emissions.

1.4.2.1 Phase 1 Expansion
During Phase 1 of the plant expansion, the grit chamber will be replaced with a covered vortex de-gritting system, which will require foul air ventilation and probably an in-ground biofilter. This will reduce the potential for odor in this area. The existing sludge drying beds will be eliminated to create space for the new aeration basins and replaced by a new mechanical dewatering facility. The septage receiving station, headworks, and primary clarifiers will remain uncovered during Phase 1 of the project, and the primary clarifiers will likely be the largest source of odor.

As part of the Phase 1 expansion, there will be a reduction in the amount of recycled flow to the primary clarifiers because the existing trickling filters will be shut down, making it likely that only one of the two primary clarifiers will need to be operated under normal conditions. In order to mitigate potential odor issues from the operating primary clarifier, one mitigation strategy considered was to keep the existing Primary Trickling Filter No. 2 ( the most recently constructed) to help with odor control. The concept is that by retaining Primary Trickling Filter No. 2, oxygenated flow would be continuously recirculated to the primary clarifier in operation, thereby helping to suppress anaerobic conditions that generate H2S. This concept is shown schematically in Figure 1.3. To make this work, two options were considered for the pumping arrangement.
 Option 1: Rehab of Existing Primary Trickling Filter Pump Station:
» To provide odor mitigation for the existing uncovered primary clarifiers during Phase 1, this option would rehabilitate the existing primary trickling filter pump station so that it can pump primary effluent from the primary clarifier in service to the existing Primary Trickling Filter No. 2.

Rehabilitation of the pump station would include a new concrete liner, piping, pumps, and valves.

The rehabilitated pump station would receive primary effluent from the primary clarifier(s) and pump primary effluent to the primary trickling filter through already existing pipework. The effluent from the primary trickling filter would be circulated back to the primary clarifier feed through new pipework.
 Option 2: New Primary Trickling Filter Pump Station:
» This option would construct a new, smaller primary trickling filter pump station at a location where the primary effluent pipes from the primary clarifiers intersect. The new pump station would use H2S-resistant concrete admixture and would include an overflow weir to send excess primary clarified water to the new aeration basins when flow from the primary clarifiers exceeds the capacity of the primary trickling filter. For this option, because new pipework will be required, the primary trickling filters distributor mechanism would be upgraded to include two additional arms to increase capacity from 7.8 million gallons per day (mgd) to 11.7 mgd or more. Figure 1.4 illustrates this odor mitigation strategy for Phase 1 expansion.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-10
A possible negative outcome of the approach to keep Primary Trickling Filter No. 2 in operation is that, because of incidental biochemical oxygen demand (BOD) removal in the trickling filter, additional chemicals may be required to accomplish full denitrification in the new aeration basins. This aspect will need to be further evaluated during the preliminary design.

Other options for controlling potential odor from the primary clarifiers during Phase 1 will also be developed and considered during the preliminary design phase so that the City can compare options and select the most suitable approach.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-11
Figure 1.3 Phase 1 Expansion Odor Control Strategy - Reuse Primary Trickling Filter No. 2 VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-12
Figure 1.4 Phase 1 Expansion Odor Control Strategy - Option to Construct a New TF Pump Station VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-13

1.4.2.2 Phase 2 Expansion
In Phase 2 of the plant expansion, an odor control facility would be constructed to treat foul air from the septage receiving station, the future headworks and grit removal system, and the updated covered primary clarifiers. Space has been allocated in the Phase 2 layout, shown in Figure 1.5, for a new odor control system utilizing an in-ground biofilter. An in-ground biofilter uses organic media, such as wood chips and compost to biologically degrade odorous compounds, including H2S and VOCs. In-ground systems offer passive treatment with low energy demand and high removal efficiency and are well-suited for continuous odor sources.

VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-14
Figure 1.5 Phase 2 WWTP Facilities Layout
VOLUME 10 / CHAPTER 1: AIR QUALITY EMISSIONS
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 1-15

1.4.2.3 Cost Considerations
Odor control improvements for the Santa Maria WWTP will be implemented in a phased approach, balancing operational effectiveness with capital investment. Phase 1 focuses on leveraging existing infrastructure for low-cost odor mitigation, while Phase 2 anticipates construction of a centralized treatment system. Table 1.4 provides high-level planning costs for odor control improvements for both Phases 1 and 2 of the plant expansion. As noted, other mitigation measures for Phase 1 will be considered and evaluated during the preliminary design phase.

Table 1.4 Planning Level Cost for Odor Control Improvements Phase Odor Control Improvement Key Components Estimated Costs 1 Option 1: Primary Trickling
Filter Recirculation w/ Existing
Primary Trickling Filter Pump
Station
 Use of existing trickling filter
and pipework.
 Rehab of primary trickling
filter pump station includes
new concrete liner, piping,
pumps, and valves.
 Controls to adjust
recirculation rate based on
odor conditions.
$2-3 million
1 Option 2: Primary Trickling
Filter Recirculation w/ New
Primary Trickling Filter Pump
Station
 Use of existing trickling filter.
 New pipework and primary
trickling filter pump station.
 New pump station will use
H2S-resistant concrete
admixture and overflow weir.
 Controls to adjust
recirculation rate based on
odor conditions.
 Upgrade Primary Trickling
Filter No. 2 distributor
mechanism to add 2 more
arms.
$5-6 million
2 Biofilter Centralized Odor
Control System
 In-ground biofilter.
 Fiberglass ducting from
process areas.
 Fans/blowers for ventilation.
$3-4 million
VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-1
CHAPTER 2 PERMITTING PLAN

2.1 Introduction
The City of Santa Maria (City) is embarking on a large program to upgrade its existing wastewater treatment plant (WWTP) to meet the new General Permit requirements issued by the Central Coast Regional Water Quality Control Board (RWQCB). The first phase of the program (Phase 1) is expected to be complete by late 2033 or early 2034. Throughout this program, existing permits held by the City's WWTP will require modifications, and additional permits will be required during construction. This chapter provides a permitting plan for the program that includes a list of permits, contact persons, probable requirements, and an anticipated schedule for the permit applications and receipt of permits.

2.2 Permits Requiring Modification
The City's WWTP has several permits that are required under the current plant configuration that will require modification at some point during the Phase 1 program. The subsequent sections describe the existing permits that will need to be modified and the probable requirements for permit modification.

Table 2.1 at the end of the section provides a list of these permits, contact persons, and the anticipated schedule for the permit applications and receipt of permits and current copies of all existing permits are included in Appendix A.

2.2.1 Central Coast Regional Water Quality Control Board The City's WWTP operates under General Waste Discharge Requirements (WDR) Order No. R3-2020-0020, issued by the Central Coast RWQCB. This permit applies to domestic wastewater facilities with flows exceeding 100,000 gallons per day and regulates land-based discharges, including percolation ponds and land application systems. As the City moves forward with its Phase 1 treatment plant expansion, it will be necessary to update the facility's permit coverage under this general order to reflect increased flow capacity, revised treatment processes, and potential changes in discharge characteristics.

An update to the permit is triggered when there is a planned increase in average dry weather flow, modifications to the treatment process that may affect effluent quality, or changes to the discharge location or method. Wastewater system expansions must be made in accordance with the conditions of the General Permit and require re-evaluation of the existing Notice of Applicability (NOA). Pursuant to California Water Code Section 13260, the Discharger must inform the Central Coast Water Board Executive Officer at least 120 days prior to making a material change in the character, location, or volume of discharge.

The expansion project will require submittal of an updated Report of Waste Discharge (ROWD), which must detail both phases of construction, anticipated flow increases, revised treatment train configuration, updated influent and effluent characteristics, and any modifications to disposal methods. The ROWD should also include site plans, process flow diagrams, and environmental documentation under the California Environmental Quality Act (CEQA).

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-2
The City is also planning one or more near-term projects in preparation for the larger Phase 1 expansion.

One example is the construction of new percolation ponds. This will require a modification of the current permit. The City is planning to meet with the RWQCB regarding this project and other milestone requirements set out in the Time Schedule Compliance Plan, which will provide an opportunity to review the scope and timeline of the program and confirm permitting expectations. Depending on the scale and timing of individual projects, the RWQCB may issue an amended NOA with phase-specific conditions or flow triggers. To ensure regulatory compliance, the updated permit must demonstrate that the facility will continue to meet effluent limitations, avoid degradation of water quality, and incorporate appropriate monitoring and operational controls. The ROWD and associated materials will need to be submitted well in advance of Phase 1 construction, typically six months prior, to allow for adequate regulatory review and coordination with CEQA documentation.

2.2.2 Biosolids
The City's WWTP currently produces Class B biosolids and disposes of them at the City's landfill and the Engel & Gray, Inc. (E&G) composting facility. Any changes to solids production volumes, treatment processes, or end-use locations triggered by the plant expansion will require updates to the facility's biosolids management plan, possible revisions to the waste discharge permit, and applications for new hauling permits.

Phase 1 of the expansion is expected to increase solids digestion capacity. While this phase may not immediately change the final biosolids classification or end-use method, the increased digester volume may alter retention times, volatile solids reduction performance, or pathogen vector attraction reduction (VAR) strategies. Any change in these parameters must be documented and reported in accordance with the 40 Code of Federal Regulations (CFR) Part 503 requirements, including updated sampling and analysis data. Additionally, as detailed in Volume 8 of the Master Plan, the disposal destination for the biosolids produced by the WWTP may change, triggering an update to the biosolids management plan and the application for new land application permits during Phase 1 of the program.

The ultimate expansion of the WWTP around 2045, Phase 2, will introduce further solids processing impacts due to the addition of another digester and new gas handling systems. If biosolids production increases substantially or if operational changes affect stabilization, dewatering, or beneficial use pathways, the City will need to update its Biosolids Management Plan and possibly seek revised land application agreements or permits from receiving counties. Additionally, the RWQCB may request a revised biosolids handling section of the plant's ROWD or require updates under the general WDR order if biosolids storage or discharge to land areas are modified.

To remain in compliance, it is recommended that the City conduct an early review of biosolids treatment and performance projections for both phases and consult with the Central Coast RWQCB and any destination counties for land-applied biosolids. Annual biosolids reports submitted to the United States Environmental Protection Agency (EPA) and RWQCB under Part 503 will need to reflect the updated volumes and characteristics following each expansion phase.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-3

2.3 New Permits Required for Future Expansion
This section summarizes the new permits required for both phases of the expansion program at the City's WWTP. Table 2.1 at the end of the section provides a list of these permits, contact persons, and the anticipated schedule for permit applications and receipt of permits.

2.3.1 City of Santa Maria Community Development Department The City's Community Development Department oversees and guides land use, construction, and community planning within the city. The Building Division enforces building codes and inspects projects during construction. It conducts building plan reviews and issues building permits to ensure public health, safety, and structural compliance.

2.3.1.1 Building Permit
A building permit is required for the construction, alteration, or repair of any occupied structure at the WWTP. The permit ensures compliance with the California Building Code (CBC), electrical, mechanical, plumbing, and fire codes. Submittals typically include stamped construction drawings, structural calculations, and architectural layouts. The Building Division of the City's Community Development Department is mandated by State Law 17960 (Health & Safety Code) to be responsible for monitoring construction activity and to determine that any ongoing construction project has the required permits and conforms to the approved plans and any conditions of approval. Building permit applications should be submitted during the final design. The lead time for review/approval is typically four to eight weeks, depending on the complexity. For each phase of the proposed program, it is anticipated that a separate Building Permit will be required.

2.3.2 Santa Barbara County Air Pollution Control District The City's WWTP currently operates under Permit to Operate (PTO) No. 08390-R11, issued by the Santa Barbara County Air Pollution Control District (SBCAPCD). As part of the plant expansion, the PTO will need to be revised to reflect new emission sources and operational changes associated with both phases of the facility's planned expansion. The current permit governs existing digester gas and combustion-related operations, and any physical or operational modification that results in a change in emissions, control equipment, or process throughput requires Air Pollution Control District (APCD) approval through the Authority to Construct (ATC) process.

Phase 1 of the expansion involves the addition of one new anaerobic digester and the modification of an existing digester. These changes are expected to increase biogas generation and alter the load on existing gas-handling systems, thereby affecting emissions from flares, gas conditioning units, and any backup combustion systems. In addition, the Phase 1 project includes the addition of a biogas combustion engine for energy and heat recovery. APCD will require a permit modification to assess these impacts and ensure continued compliance with emission limits for volatile organic compounds (VOCs), methane, hydrogen sulfide, and other constituents.

Phase 2 introduces several new stationary sources, including an additional anaerobic digester, a new digester flare, hot water boilers, and a combined heat and power (CHP) cogeneration (Cogen) facility.

These sources will generate additional emissions of criteria pollutants as well as greenhouse gases. As such, they may be subject to APCD's New Source Review (Rule 370) Best Available Control Technology VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-4
(BACT) requirements and toxic air contaminant evaluation under Rule 802. Emissions modeling and stack parameters for the flare and Cogen system may be required to demonstrate compliance with ambient air quality standards and permit thresholds.

Coordination with APCD should begin early in the design process to confirm regulatory applicability and permitting pathways. For each phase of the program, the project team will need to prepare an ATC application that includes detailed descriptions of the new or modified equipment, manufacturer specifications, projected emissions data, proposed control technologies, and any required air dispersion modeling.

In summary, the Santa Maria WWTP operates and plans to construct several stationary air emissions sources that are subject to permitting through the SBCAPCD. These sources include combustion and gas handling equipment such as standby generators, sludge heating boilers, anaerobic digesters, flares, and Cogen engines. Under SBCAPCD rules, new equipment requires an ATC, and all equipment requires a PTO.

For the ATC permit application, submittal of design specs, emission estimates, fuel types, and operating scenarios must be submitted. ATC must be approved before the equipment installation. After installation and performance validation, an application for PTO can be submitted. Additionally, BACT may be required for new or modified sources emitting above the defined thresholds. The anticipated lead time for obtaining an updated ATC permit is six to twelve months.

2.3.2.1 Construction-Related Permits
For the Santa Maria WWTP two-phase upgrade project, construction activities will trigger several additional SBCAPCD permits. Portable construction equipment rated at 50 brake horsepower or greater (e.g., generators, pumps, compressors) must either be registered in the California Air Resources Board (CARB) Portable Equipment Registration Program or be permitted individually by SBCAPCD.

Additionally, because both phases will include multi-year grading, excavation, and demolition, the project must comply with Rule 345 (Control of Fugitive Dust). This rule applies to any activity associated with the construction or demolition of a structure or structures and includes requirements for visible fugitive dust beyond the property line, truck hauling, carry-out, and demolition. This rule is a standards-based rule with no recordkeeping, permitting, or dust control plant requirements. District Inspectors can issue Notices of Violation for sources that are causing a nuisance or failing to comply with the rule requirements.

Demolition activities also require compliance with the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) in accordance with the Clean Air Act (CAA). The Asbestos NESHAP specifies work practices to be followed during demolitions and renovations of structures and requires contractors to notify the SBCAPCD before demolitions or renovations of buildings that contain a certain threshold amount of asbestos. The contractor will be required to complete an asbestos survey and submit a notification to the SBCAPCD at least 10 working days before demolition that must include the scheduled starting and completion date of the work, the location of the site, the names of operators or asbestos removal contractors, methods of removal and amount of asbestos, and whether the operation is a demolition or renovation.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-5

2.3.3 Santa Barbara County Environmental Health Services Certified Unified Program Agency
The Santa Barbara County Environmental Health Services (EHS) Department, acting as the Certified Unified Program Agency (CUPA), regulates hazardous materials management at the Santa Maria WWTP under California's unified hazardous materials and waste program. Facilities that store or use hazardous substances above threshold quantities, such as sodium hypochlorite, polymers, diesel fuel, and waste oil, are required to maintain a Hazardous Materials Business Plan (HMBP). The HMBP includes a hazardous materials inventory, site map, and a Hazardous Material Release Response Plan to ensure proper notification, containment, and emergency response procedures in the event of a spill or release.

Submittals must be uploaded through the California Environmental Reporting System (CERS) and are subject to periodic review and on-site inspection by EHS. Updates to the HMBP are required annually or when significant changes to chemical use, storage volumes, or site operations occur. The WWTP must also comply with CUPA requirements related to hazardous waste generation, tank integrity, and employee training.

The Phase 1 project will introduce new chemicals to the site that will require regulation under the CUPA.

2.3.4 State Water Resources Control Board
The State Water Resources Control Board (SWRCB) is responsible for ensuring the proper allocation and quality of the state's water resources, and the Central Coast RWQCB is responsible for implementing the state's water resources locally. Stormwater flows and runoff from the site have not yet been determined for the Phase 1 project, but the permits discussed below will need to be considered during the preliminary and final design phases of the project.

2.3.4.1 Construction General Permit
The Construction General Permit is required for any construction activity that disturbs one acre or more of soil. Administered through the SWRCB and the Central Coast RWQCB and implemented locally under the City's Municipal Separate Storm Sewer Systems (MS4) program, the permit is intended to prevent sediment, debris, and other construction-related pollutants from entering local storm drains and receiving waters.

Permit compliance requires preparation of a Stormwater Pollution Prevention Plan (SWPPP), which identifies and implements Best Management Practices (BMPs) to address erosion control, sediment containment, materials storage, waste handling, and stormwater flow management. The permit must be obtained by submitting a Notice of Intent (NOI) through SWRCB's Stormwater Multiple Application and Report Tracking System (SMARTS) portal prior to the start of ground-disturbing activities. The SWPPP must be implemented throughout construction, with regular inspections, monitoring, and recordkeeping as required by the site's risk level classification.

2.3.4.2 MS4 Permit Post-Construction Requirements
City's MS4 Permit Post-Construction Requirements (PCRs) (R3-2013-0032) will need to be evaluated during the building plan submittal and review process. Based on the project scope, footprint, etc., VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-6
a determination will be made as to whether and or how the PCRs will be implemented. Evaluation will be initiated by the submittal of a Stormwater Control Plan (SWCP) with the Building Permit submittals.

The SWCP will document how the project will comply with the PCRs by documenting permanent site design features that retain, infiltrate, and treat stormwater runoff following project completion.

Post-construction BMPs should be finalized during the 90 to 100 percent design.

2.3.4.3 Industrial General Permit
The Santa Maria WWTP is subject to the Statewide Industrial General Permit (IGP) for stormwater discharges, issued by the SWRCB. The IGP applies to wastewater treatment facilities classified under Standard Industrial Classification Code 4952. Under this permit, a WWTP is required to implement a SWPPP specific to industrial operations, conduct quarterly visual observations, and perform annual stormwater sampling and reporting. All documentation, sampling results, and the annual report must be submitted through the SMARTS database. The WWTP must also implement BMPs to prevent industrial pollutants from being exposed to stormwater, including containment, housekeeping, and material handling protocols. The IGP is separate from the Construction General Permit and applies to ongoing operations.

Currently, the WWTP does not need coverage under the IGP because all stormwater is retained on site and there is no industrial discharge. For Phase 1 and Phase 2 of the upgrade project, the requirement for enrollment would need to be evaluated to determine if there are any changes that would require the new WWTP to enroll and be covered under the IGP. If determined that an IGP is required, the SWPPP and site map would need to be updated to reflect the new treatment processes and solids handling.

2.3.5 State of California Department of Industrial Relations Division of Occupational Safety and Health

2.3.5.1 Pressure Vessel Unit Permit to Operate
The WWTP operates certain equipment, such as boilers, propane storage, and may need a digester gas storage vessel in the future, each of which qualifies as a pressure vessel under the California Code of Regulations Title 8. These vessels are regulated by the California Division of Occupational Safety and Health (Cal/OSHA) Pressure Vessel Safety Program, which requires an annual PTO. Vessels must be registered with the state and inspected either by Cal/OSHA or an authorized third-party inspector.

Pressure vessels must comply with design, safety relief, and maintenance standards outlined in Title 8 Sections 450-560. A PTO must be displayed at or near the vessel and reviewed annually. As part of the expansion, any new pressure vessels installed will need to be permitted prior to operation and incorporated into the facility inspection and safety program.

2.3.6 Post Construction Additional Permits and Programs Following the completion and commissioning of the expanded WWTP, several regulatory programs and permits may require updates to reflect changes in treatment capacity, influent characteristics, and operational processes. These updates are critical to maintaining regulatory compliance and ensuring that new facilities are integrated into the plant's broader environmental management framework.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-7

2.3.7 Pretreatment Program
One key area requiring attention is the pretreatment program, which is regulated under 40 CFR Part 403 and administered by the Central Coast RWQCB. The City operates an approved pretreatment program to control the discharge of industrial and commercial pollutants that could interfere with treatment processes or pass through to the environment. With changes to plant flow rates, treatment capacity, and solids handling capabilities, a pretreatment program update study will be needed. The study will evaluate whether the plant's local limits remain protective of the upgraded treatment process and effluent quality.

If updates to the local limits are warranted, the City must submit revised calculations, public participation documentation, and a program modification package to the RWQCB for approval. Additionally, any structural or administrative changes to the pretreatment program must be documented and submitted.

2.3.8 SWRCB Environmental Laboratory Accreditation Program Another area requiring post-construction attention is the facility's participation in the Environmental Laboratory Accreditation Program (ELAP), managed by the California SWRCB. If laboratory facilities at the WWTP are expanded or upgraded, or if the analytical scope changes (new instrumentation, new permit-required parameters, etc.), the City must ensure the laboratory ELAP certification is updated accordingly.

Although the program does not directly expand or upgrade the laboratory facilities at the WWTP, there may be analytical scope changes that require an update to the ELAP certification. ELAP requires adherence to The NELAC Institute (TNI) 2016 Standard, including documented quality assurance procedures, staff competency records, and proficiency testing. Any significant changes to laboratory operations, methods, or equipment following construction must be reported to ELAP, and an amended application may be needed to maintain accreditation.

2.4 Permitting Plan Summary
Table 2.1 lists all permits that will be required as part of the two-phase expansion program and includes contact persons, probable requirements, and an anticipated schedule for the permit applications and receipt of permits. Additionally, Figure 2.1 illustrates the relative timing of the various permits listed in Table 2.1.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-8
Table 2.1 Permitting Plan for Santa Maria WWTP Expansion Program Permit Agency Contact Persons Probable Requirements Permit Application Schedule
Permit Receipt
Schedule
Permits Requiring Modification
WDR General
Permit (R3-2020-
0020)
Central Coast
RWQCB
Permit Engineer
(WDR Staff)
 Updated ROWD/NOI including phased flow
increases.
 Treatment diagrams.
 New disposal areas.
 CEQA documentation.
 Revised Monitoring and Reporting Program.
 Submit 6-12 months
prior to Phase 1
construction
completion.
 RWQCB review
~6-9 months.
 Amended NOA
issued when
construction is
complete, and the
Phase 1 project is
commissioned.

Sludge Management
Plan Update
Central Coast
RWQCB
Permit Engineer
(WDR Staff)
 Update description of biosolids treatment and
disposal.
 Compliance with CFR Part 503.
 Submit with WDR
amendment.
 Prior to digester
commissioning in
Phase 1.

New Permits Required for Phase 1 and Phase 2 of Program Building Permit City's Community
Development
Department Building
Division
Plan Check
Engineer
 Construction documents.
 Energy/mechanical calculations.
 Inspections.
 Fire/life safety compliance.
 Calculations.
 Equipment data.
 Submit 4-6 months
prior to construction.
 Review process
takes ~2-3 months.

Construction
General Permit
(SWPPP)
SWRCB
(via SMARTS)
Stormwater Permit
Engineer
 SWPPP.
 BMP design.
 NOI via SMARTS.
 Submit NOI 30 days
before Phase 1
ground disturbance.
 Coverage ~1 week
post-submittal.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-9
Permit Agency Contact Persons Probable Requirements Permit Application Schedule
Permit Receipt
Schedule
MS4 Permit PCRs City of Santa Maria
Community
Development
Department Building
Division
SWCP reviewed by
Public Works
Department
Principal Engineer in
Development as part
of Building Permit
plan check process.
 Site-specific BMP design.
 Hydrology report.
 Operations and maintenance plan.
 After submittal of
Stormwater Control
Plan with the
Building Permit
Submittals.
 Submit during
60-90% design
phase.
 Approved with
grading/building
plan check.

APCD ATC and
PTO Permit
SBCAPCD Engineering and
Permitting
Supervisor
 ATCs for digester modifications (Phase 1).
 ATC for new flare, boilers, and Cogen
(Phase 1).
 Emission estimates.
 BACT.
 CEQA review.
 Modeling.
 ATC Phase 1 due
prior to Phase 1
construction.
 ATC Phase 2 due
prior to Phase 2
construction.
 Receive PTO permit
~6-12 months after
submittal after install
and testing.

Hazardous Materials
Business Plan
Santa Barbara
County EHS CUPA
Hazardous Materials
Coordinator
 Hazardous materials inventory.
 Training plan for gas handling and new
flammable/combustible materials.
 Update site map.
 Emergency response plan.
 CERS upload.
 1-2 months before
chemical delivery.
 Approval in 1-2
weeks, requires
annual updates.

Pressure Vessel
PTO
Cal/OSHA Local Pressure
Vessel Inspector
 Registration of boilers.
 Plan review and inspection of new digesters,
gas piping, and boilers.
 The American Society of Mechanical
Engineers certification.
 Submit 2-3 months
prior to
commissioning
vessels.
 30-60 days
approval.

VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-10
Permit Agency Contact Persons Probable Requirements Permit Application Schedule
Permit Receipt
Schedule
IGP SWRCB (SMARTS) IGP Program Staff  SWPPP.
 Industrial Site Map.
 Visual/annual stormwater sampling.
 BMP implementation.
 Submit before new
processes become
active.
 Permit issued within
2-3 months.

Pretreatment
Program
Central Coast
RWQCB
Permit Engineer
(WDR)
 Local limits update study.
 Update sewer use ordinance.
 Local limits monitoring plan if influent
characteristics or side stream discharges
change.
 Sampling, analysis,
and development of
local limits may take
1-2 years to prepare
and submit after the
Phase 1 facilities
are online.
 Approval takes
3-6 months.

ELAP CA ELAP SWRCB ELAP Program
Manager
 Quality Assurance/Quality Control Manual.
 Staff certification.
 Modify laboratory scope or certification for
new testing methods or analytes.
 Submit 3 months
prior to new permit
compliance testing.
 Review takes
~2-3 months.

Notes:
~ - approximately; % - percent
VOLUME 10 / CHAPTER 2: PERMITTING PLAN
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA
WASTEWATER TREATMENT PLANT MASTER PLAN 2-11
Figure 2.1 Permitting Schedule for Phase
VOLUME 10 / AIR QUALITY AND EMISSIONS ODOR CONTROL
OCTOBER 2026 / FINAL / CAROLLO

CITY OF SANTA MARIA

WASTEWATER TREATMENT PLANT MASTER PLAN

APPENDIX A EXISTING SANTA MARIA WWTP PERMITS
Central Coast

SRWQCB WDR
Permit
Central Coast Regional Water Quality Control Board
June 16, 2023 Sent Via Electronic Mail
Shad Springer, Director of Utilities
City of Santa Maria – Utilities Department
2065 E. Main Street
Santa Maria, CA 93454
Email: [email protected]
Dear Shad Springer:

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT, 601 BLACK ROAD, SANTA MARIA, CA 93458, SANTA BARBARA COUNTY:
• NOTICE OF APPLICABILITY FOR ENROLLMENT IN ORDER NO. R3-2020- 0020, GENERAL WASTE DISCHARGE REQUIREMENTS FOR DISCHARGES

FROM DOMESTIC WASTEWATER SYSTEMS WITH FLOWS GREATER
THAN 100,000 GALLONS PER DAY;
• TRANSMITTAL OF MONITORING AND REPORTING PROGRAM NO. R3- 2023-0032; AND
• TERMINATION OF INDIVIDUAL PERMIT, WASTE DISCHARGE
REQUIREMENTS ORDER NO. R3-2010-0001 FOR THE CITY OF SANTA MARIA WASTEWATER FACILITY, SANTA BARBARA COUNTY.

The Central Coast Regional Water Quality Control Board (Central Coast Water Board) reviewed the August 5, 2022, notice of intent and available documents associated with City of Santa Maria’s domestic wastewater treatment facility (Wastewater System) located at 601 Black Road in Santa Maria, California. The Wastewater System, owned by the City of Santa Maria is currently regulated pursuant to Waste Discharge Requirements Order No. R3-2010-0001 for the City of Santa Maria Wastewater Facility, Santa Barbara County (Order No. R3-2010-0001).

On September 25, 2020, the Central Coast Water Board adopted General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

This letter serves as a notice of applicability for enrollment in the General Permit. This letter includes: wastewater system operation summary, specific requirements, and City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
limitations (Attachment 1); figures (Attachment 2); and City of Santa Maria’s monitoring and reporting program requirements (Attachment 3).

This letter also serves as a notice of termination of City of Santa Maria’s coverage in existing individual permit, Order No. R3-2010-0001.

City of Santa Maria must comply with the following:

1. General Permit – City of Santa Maria must comply with all conditions and requirements of the General Permit. As described in the General Permit, ongoing operation, maintenance, monitoring, and reporting are required. A copy of the General Permit can be found electronically at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/r32020_0020.pdf

2. Monitoring and Reporting Program – City of Santa Maria must comply with the requirements of the monitoring and reporting program enclosed with this letter (monitoring and reporting program no. R3-2023-0032, Attachment 3). City of Santa Maria must start implementing the monitoring on October 1, 2023. The first quarterly monitoring report is due February 1, 2024 and the first annual report is due March 1, 2024. City of Santa Maria is also required to submit an annual pretreatment program report1 due on March 1st and the annual volumetric reporting requirements2 established by the State Water Resources Control Board (State Water Board), due April 30th. Annual reports must be submitted to the GeoTracker database.

Quarterly monitoring reports and annual reports must be provided electronically in searchable PDF with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed. https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater _permitting/docs/transmittal_sheet.pdf
All annual reports must be formatted and completed as specified in the annual report template found at the following link:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf
City of Santa Maria must submit all reports/documents and laboratory data (using the transmittal sheet as the cover page) to the publicly accessible State Water 1 California Code of Regulations title 23 section 2233 View Document - California Code of Regulations (westlaw.com)
2 See: Volumetric Annual Reporting | California State Water Resources Control Board City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Board’s GeoTracker3,4 database with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System – specific global identification number WDR100029526 over the internet at:
https://geotracker.waterboards.ca.gov/esi/login.asp
The attached monitoring and reporting program outlines the GeoTracker electronic reporting requirements. The Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

3. Fees – City of Santa Maria paid an annual fee of $123,934.00 on January 24, 2023 for coverage in existing individual permit, Order No. R3-2010-0001. This payment covers City of Santa Maria‘s enrollment in the General Permit for the 2022-2023 fiscal year.

City of Santa Maria must pay an annual fee to maintain coverage in the General Permit. Annual fees are determined by the State Water Board’s fee program and cover the state fiscal year of July 1 through June 30. The Central Coast Water Board has lowered your assigned threat and complexity rating to 2A which will result in a reduced annual fee (currently $41,063) starting with the 2023-2024 fiscal year. A copy of the current state fee schedule is available electronically at the following link:
https://www.waterboards.ca.gov/resources/fees/water_quality/#wdr

4. Notification – The Central Coast Water Board will be notified of City of Santa Maria’s enrollment at a regularly scheduled public meeting on August 24-25, 2023. Details about that meeting are available on our website at:
https://www.waterboards.ca.gov/centralcoast/board_info/agendas/

5. Future Discharge Modifications – Pursuant to California Water Code section 13260, City of Santa Maria must inform the Central Coast Water Board at least 120 days prior to modifying your discharge. If there are any significant changes in either treatment or disposal methodologies, or the volume or character of the treated wastewater, City of Santa Maria must notify the Central Coast Water Board immediately of such changes.
3 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/ 4 Additional information available at: http://geotracker.waterboards.ca.gov/ City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Attachment 1 contains the Central Coast Water Board’s understanding of the Wastewater System located at 601 Black Road, Santa Maria, CA 93458. Please review Attachment 1 to determine if the description is representative of your current system. Pursuant to California Water Code section 13267, City of Santa Maria must notify the Central Coast Water Board if this information is out of date or incorrect. You are required to provide staff with your updated information within 30 days of issuance of this letter.

6. Responsible Party – City of Santa Maria is responsible for the management and disposal of the domestic wastewater in compliance with the conditions of the General Permit. Any noncompliance with this General Permit constitutes a violation of the California Water Code, and subjects City of Santa Maria to enforcement action, and termination of enrollment under this General Permit.

7. Change in Ownership - In the event of any change in control or ownership of the property, City of Santa Maria must notify the succeeding owner or operator of the existence of this General Permit by letter, a copy of which shall be immediately forwarded to the Central Coast Water Board so that the new owner or operator can be enrolled in the General Permit and City of Santa Maria’s enrollment in the General Permit can be terminated.

8. Certified Operator – City of Santa Maria is required to comply with the operator certification requirements5 administered by the State Water Board’s Office of Operator Certification, which currently requires a Grade IV certified operator onsite to maintain and operate the Wastewater System. The City of Santa Maria must:
a. Keep a current Wastewater Treatment Plant Classification Form on file with the Office of Operator Certification and update the form when modifications to the Wastewater System treatment processes occur. b. Provide the Office of Operator Certification with a Chief Plant Operator Acknowledgement Form and update this information within 30 days of a change of Chief Plant Operator.
c. If a contractor operator is used, the contract operator must register with the Office of Operator Certification and obtain a contract operator certificate for the Wastewater System.

Forms are available at the following link:
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/for m.html
5 Title 23 Division 3. Chapter 26 Wastewater Treatment Plant Classification, Operator Certification and Contract Operator Registration.
https://www.waterboards.ca.gov/water_issues/programs/operator_certification/docs/ocr_clean.pdf City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

9. Termination of Permit – The existing individual permit, Order No. R3-2010-0001 is terminated, except for enforcement purposes.6 City of Santa Maria is responsible for compliance with Order No. R3-2010-0001 prior to the date of this letter.

10.Compliance Plan – As required in the attached monitoring and reporting program, City of Santa Maria must, by June 16, 2024, prepare and submit for Central Coast Water Board review and approval a time schedule compliance plan.

If you have any questions, please contact Cecile Blancarte at (805) 542-4782 or by email at [email protected] or Jennifer Epp at (805) 594-6181 or by email at [email protected].

Sincerely,
for Matthew T. Keeling
Executive Officer
Attachments:

Attachment 1: Wastewater System Operation Summary, Specific Requirements, and Limitations
Attachment 2: Figures
Attachment 3: Monitoring and Reporting Program Order No. R3-2023-0032

cc:

Alexandra Griffith, City of Santa Maria, [email protected] Russ Newman, City of Santa Maria, [email protected] Office of Operator Certification, [email protected] Jennifer Epp, Central Coast Water Board, [email protected] Jesse Woodard, Central Coast Water Board, [email protected] Cecile Blancarte, Central Coast Water Board, [email protected] WDR Program, GeoTracker [email protected]
6 The General Permit states “… where a Wastewater System discharge is currently regulated by an individual permit, that permit is terminated upon the enrollment of the Wastewater System into this General Permit.”
City of Santa Maria - 6 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ECM/CIWQS = CW-255678
GeoTracker No. = GT- WDR100029526
Rev 12/21/2022
ECM Subject Name = City of Santa Maria Wastewater Treatment Plant NOA for R3- 2020-0020
\\ca.epa.local\rb\rb3\shared\wdr\wdr facilities\santa barbara co\santa maria wwtp\order 2020- 0020\final\santa maria r3-2020-0020 noa_final.docx
ATTACHMENT 1

WASTEWATER SYSTEM OPERATION SUMMARY, SPECIFIC REQUIREMENTS,

AND LIMITATIONS

1. OWNERSHIP AND WASTEWATER SYSTEM INFORMATION
Ownership and wastewater system information submitted by City of Santa Maria to the Central Coast Water Board is shown in Table 1.

Table 1. Ownership and Wastewater System Information
Name City of Santa Maria Wastewater
Treatment Plant
Physical Address 601 Black Road Santa Maria, CA 93458
Lattitude 34°56'54.93"N
Longitude 120°29'49.59"W
Mailing Address 2065 E. Main Street, Santa Maria, CA
93454
Owner City of Santa Maria
Operator
Russ P. Newman
phone: (805) 925-0951 x721
e-mail: [email protected]
Legally Responsible Official
Shad Springer
phone: (805) 925-0951 x7211
e-mail: [email protected]
Raw Wastewater
Characteristics
Sewer Connections: 22,020
Population Served: 107,407
Domestic (%): 91%
Industrial (%): 9%
Permitted Design Flow,
Average Monthly (Million
gallons per day, mgd)

8.0 Baseline Flow (average
annual flow) in mgd

7.2 Threat to Water Quality 2
Complexity B
For Internal Use
Fee Code 58
Primary Place Type Wastewater Treatment Facility
Facility Type Municipal/Domestic
Facility Waste Type Domestic Wastewater
Regulatory measure Type Enrollee - WDR
Reclamation Included No
EPA Approved Pretreatment
Program
Yes
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant

2. WASTEWATER SYSTEM OPERATION SUMMARY
The City of Santa Maria wastewater treatment facility (Wastewater System) is a Class IV wastewater system. City of Santa Maria must staff a Grade IV chief plant operator for proper operation of the Wastewater System. The current chief plant operator is Russ P.

Newman, Grade IV, Operator No. 29543, Certificate No. 28863 (expires 1/18/2026).

The Wastewater System is capable of treating 13.5 million gallons per day (mgd) to a secondary treatment level but is limited in disposal capacity to 8.0 mgd. The Wastewater System consists of the treatment technologies and treatment capabilities shown in Table 2.

Table 2. Treatment Technology and Capacity
Headworks/Preliminary
Treatment
The headworks consists of a Parshall flume flow meter,
three automatic bar screens followed by two aerated grit chambers.

Headworks capacity (mgd): 13.5
Primary Treatment
Clarifiers: Primary treatment consists of two primary
clarifiers that operate in parallel. The volume of each clarifying tank is 1.32 million gallons.

Primary treatment capacity (mgd): 27.92
Secondary Treatment
Trickling Filters: Secondary treatment is performed using two primary and two secondary aerobic trickling filters.

Each of the primary trickling filters has a volume of
543,000 gallons. Each of the secondary trickling filters has a volume of 170,000 gallons.

Secondary treatment capacity (mgd): 17.7
Tertiary Treatment Not Applicable
Tertiary treatment capacity (gpd): 0
Disinfection Not Applicable
Disinfection Capacity (gpd): 0
Wastewater Disposal
Method
Percolation Ponds, 123 acres
Disposal capacity (mgd): 8.0
Biosolids/Sludge
Production and
Handling
Gravity Thickeners (2), Anaerobic Digestors (4), and
Sludge Drying Beds, Offsite Composting, and Landfilling Annual production of biosolids: 1,811 tons
The final destination of biosolids produced is hauled off to Engel and Gray Composting, Inc. located at 468-594 Ray
Road, Santa Maria, California, and the City of Santa Maria Landfill, 2065 E. Main Street, Santa Maria, California
Non-Potable Recycled
Water
Non-potable recycled
water produced onsite: Not Applicable
Recycled water usage
areas: Not Applicable
City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Enrolled in WQ 2016-
0068-DDW: Not Applicable
Recycled water production
volume (gpd): Not Applicable
A summary of historic and recent average effluent concentrations is included in Table 3, which were reported in City of Santa Maria quarterly monitoring reports. The Central Coast Water Board used reported effluent water quality data to establish the effluent and groundwater limitations in section 3.

Table 3. Effluent Water Quality for Select Constituents Constituents Unit [1][2] Historical
Average[3]
Annual Average
for 2022[4]
Carbonaceous Biochemical
Oxygen Demand, 5-Day[5] mg/L 43 45
Total Suspended Solids mg/L 39 37
Total Dissolved Solids mg/L 844 1,055
Chloride mg/L 156 143
Sodium mg/L 145 140
Sulfate mg/L 196 320
Boron mg/L 0.35 0.41
Total Nitrogen mg/L 43 42
Settleable Solids ml/L[4] <0.1 <0.1
pH Standard
Units 8 7.8
[1] mg/L denotes milligrams per liter.
[2] ml/L denotes milliliters per liter.
[3] Based on water quality data reported by City of Santa Maria in their 2018 to 2022 monitoring reports. [4] Based on water quality data reported by City of Santa Maria in the 2022 Annual Monitoring Report. [5] The City of Santa Maria has been reporting carbonaceous biochemical oxygen demand (CBOD) instead of biochemical oxygen demand (BOD). Monitoring and reporting program no. R3-2023-0032 requires the City of Santa Maria to report BOD.

3. WASTEWATER SYSTEM SPECIFIC REQUIREMENTS AND LIMITATIONS City of Santa Maria must operate the Wastewater System in accordance with the General Permit and this notice of applicability. City of Santa Maria must comply with the wastewater specific limitations specified in Table 4 through Table 8.

Flow limitations are shown in Table 4. Interim effluent limitations shown in Table 5 apply until June 16, 2025. After June 16, 2025, effluent limitations shown in Table 6 and Table 7 apply.

A. Flow Limitations:

Table 4. Flow Limitations
Flow Units Limit Point of
Compliance
Maximum Daily Flow to Disposal Ponds mgd 8.0 Influent IS-1 City of Santa Maria - 4 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
B. Effluent Limitations:

Based on reported water quality data, effluent water quality for Carbonaceous Biochemical Oxygen Demand and Total Suspended Solids (TSS) (see Table 3) exceed the General Permit effluent limits for a trickling filter treatment system. Therefore, pursuant to the General Permit, City of Santa Maria can comply with their individual permit No. R3-2010-0001 5-day Biochemical Oxygen Demand (BOD5) and TSS limits for two years. After June 16, 2025, trickling filter effluent limitations shown in Table 6 apply.

Table 5. Interim Effluent Limitations: Trickling Filters (Until June 16, 2025) Constituent Units 30-Day
Average
Daily
Maximum
Biochemical Oxygen Demand, 5-Day mg/L 60 100
Total Suspended Solids mg/L 60 100
Settleable Solids mL/L 0.1 0.4
Total Dissolved Solids1 mg/L 1,000 Not Applicable
Sodium1 mg/L 180 Not Applicable
Chloride1 mg/L 180 Not Applicable
pH Standard
Units
Between 6.5
and 8.4
Between 6.5
and 8.4
[1] Compliance shall be based on a three-year running mean.

Table 6. Effluent Limitations[1] (After June 16, 2025)
Constituent Units 30-Day
Average
7-Day
Average
Sample
Maximum
Biochemical Oxygen
Demand, 5-Day mg/L 30 45 Not Applicable
Total Suspended Solids mg/L 30 45 Not Applicable
Settleable Solids mL/L 0.1 0.3 0.5
pH Standard
Units
Between 6.5
and 8.4
Not
Applicable Not Applicable
[1] The Central Coast Water Board understands that the City of Santa Maria will be upgrading the Wastewater System to comply with the new effluent limitations. Pursuant to General Permit Tables 3 through 5, the values in this table will vary depending on the treatment technology chosen. By June 16, 2024, the City of Santa Maria must report to the Central Coast Water Board the treatment technology chosen for the upgrades such that this notice of applicability can be updated as needed.

Table 7. Effluent Limitations (After June 16, 2025)
Based on - Upper Guadalupe Groundwater Basin
Constituents Units 25-Month Rolling Median[1]
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 105
Sulfate mg/L 500
Boron mg/L 0.5
City of Santa Maria - 5 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Constituents Units 25-Month Rolling Median[1]
Total Nitrogen mg/L 10
[1] Rolling Median is the median from all data collected over the most recent 25 months.

C. Groundwater Limitations:

Based on review of historical effluent water quality (see Table 3), City of Santa Maria is currently unable to consistently comply with the General Permit effluent limitations for total nitrogen. The Central Coast Water Board understands that the City of Santa Maria will be designing upgrades to the Wastewater System to comply with the General Permit and will be providing a time schedule compliance plan as described in monitoring and reporting program no. R3-2023-0032. In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent. Option 1 is to comply with the effluent limits in Table 7.

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan including the limitations listed in Table 8.

Table 8. Groundwater Limitations
for Designated Groundwater Basin – Upper Guadalupe Groundwater Basin Constituents Units 25-Month Rolling Median
Total Dissolved Solids mg/L 1,000
Chloride mg/L 165
Sodium mg/L 230
Sulfate mg/L 500
Boron mg/L 0.5
Total Nitrogen mg/L 1.4
City of Santa Maria - 1 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
ATTACHMENT 2

FIGURES
Figure 1 - Vicinity Map
City of Santa Maria
Wastewater
Treatment Plant
City of Santa Maria - 2 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 2- City of Santa Maria Wastewater Treatment Plant Site Map City of Santa Maria - 3 - June 16, 2023
City of Santa Maria Wastewater Treatment Plant
Figure 3 - Process Flow Schematic

CENTRAL COAST REGIONAL WATER QUALITY CONTROL BOARD
MONITORING AND REPORTING PROGRAM NO. R3-2023-0032
June 16, 2023
MODIFICATION OF MONITORING AND REPORTING PROGRAM NO. R3-2020-0020 FOR

CITY OF SANTA MARIA WASTEWATER TREATMENT PLANT

SANTA MARIA, SANTA BARBARA COUNTY
This Monitoring and Reporting Program applies to the monitoring and reporting requirements for the City of Santa Maria Wastewater Treatment Plant (Wastewater System) enrolled in General Waste Discharge Requirements Order No. R3-2020-0020 for Discharges from Domestic Wastewater Systems with Flows Greater than 100,000 Gallons per Day (General Permit).

The City of Santa Maria owns and operates the Wastewater System that is subject to the General Permit and notice of applicability. The City of Santa Maria must not implement any changes to this monitoring and reporting program unless and until a revised monitoring and reporting program is issued by the Central Coast Regional Water Quality Control Board (Central Coast Water Board).

The State Water Resources Control Board (State Water Board) and Regional Water Quality Control Boards are transitioning to the use of the publicly accessible State Water Board’s GeoTracker database for the tracking of environmental and regulatory data for sites that operate under waste discharge requirements. The monitoring and reporting program directs the City of Santa Maria to submit reports (both technical and monitoring reports) and analytical data electronically to the State Water Board’s GeoTracker database (see monitoring and reporting program section VI.C).

I. SAMPLING AND ANALYSIS
The City of Santa Maria must collect representative samples in accordance with the most recently approved sampling and analysis plan contained in the Operations and Maintenance Manual and validate analytical results prior to submittal to the Central Coast Water Board. All samples (e.g., wastewater, groundwater, soil, sludge) must be representative of the volume and nature of the discharge or matrix of materials sampled.

All samples must be collected by a qualified person, trained in proper procedures for collecting the samples. The name of the sampler, sample type (grab or composite), time, date, location, bottle/container type, and any preservative used for each sample must be recorded on the sample chain of custody form. The chain of custody form must also contain all custody information including date, time, and to whom samples were relinquished. If composite samples are collected, the basis for sampling (time or flow weighted) must be included in the sampling and analysis plan contained in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
2 Operations and Maintenance Manual for Central Coast Water Board review and approval.

A. Sampling Schedule – Unless otherwise specified below, sampling must be performed in accordance with Table 1.

Table 1. Sampling Schedule
Monitoring Period Sample Collection Time
Quarterly January, April, July, and October
Semiannual April and October
Annual October
Field test instruments (such as those used to evaluate pH, dissolved oxygen, and electrical conductivity) may be used if they are used by a State Water Board Environmental Laboratory Accreditation Program accredited laboratory, or:

1. The user is trained in proper use and maintenance of the instruments;

2. The instruments are field calibrated prior to monitoring events at the frequency recommended by the manufacturer;

3. Instruments are serviced and/or calibrated by the manufacturer at the recommended frequency; and

4. Field calibration reports are maintained and available for at least three years.

B. Monitoring Location Descriptions – All samples including influent samples (IS), effluent samples (ES), and groundwater monitoring wells (MW) must be collected at the locations described in Table 2. These locations must be consistent with the Central Coast Water Board approved sampling and analysis plan. The City of Santa Maria must upload the GeoTracker field point information for each sampling location in the GeoTracker database once, prior to uploading laboratory data (see Table 10).

Table 2. Sample Identification Details
GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Influent Sample IS-1 Raw wastewater sample collected
at the headworks
Effluent Sample ES-1
Treated wastewater sample
collected downstream of the
secondary clarifiers
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
3 GeoTracker Field
Point Class
GeoTracker Field Point
Name (Sample ID)
GeoTracker Field Point
Description [1][2]
Effluent Sample
ES-A, ES-1a, ES-2 through
ES-8, ES-11 through ES-15,
and ES-DKC
Treated wastewater sample
collected from the percolation
ponds
Monitoring Well MW-5H
Background Groundwater
Monitoring Well
Top of casing elevation unknown
Perforations 160 to 602 ft bgs
Monitoring Well MW-UMW1
Groundwater Monitoring Well
Top of Casing Elevation 175.6 ft
amsl
Screened elevations unknown
Monitoring Well MW-DMW1
Groundwater Monitoring Well
Top of Casing Elevation 158.16 ft
amsl Screened 87 to 135 ft bgs
Monitoring Well MW-DMW2
Groundwater Monitoring Well
Top of Casing Elevation 157.2 ft
amsl
Screened 82 to 155 ft bgs
Water Supply
Well
WSW-1[3] Representative sample from
potable well serving the city
[1] ft amsl denotes feet above mean sea level.
[2] ft bgs denotes feet below grade surface.
[3] Water supply sample data should be included in the annual report but does not need to be uploaded to GeoTracker if the Central Coast Water Board approves submittal of a Well Identification Number pursuant to the Water Supply Monitoring section below.

II. WATER SUPPLY MONITORING
Representative samples of the City of Santa Maria’s raw water supply (sampled before use or treatment) must be collected and analyzed, at a minimum, for constituents specified in Table 3.

In lieu of the required water supply sampling, the City of Santa Maria may request Central Coast Water Board approval to submit a Well Identification Number and the reporting year’s consumer confidence report (annual water quality report or drinking water quality report), as required by the State Water Board Division of Drinking Water and/or county, provided, at a minimum, all of the required constituents are sampled at the frequency specified in Table 3. The City of Santa Maria must report the results of any constituent monitored more frequently than is required by the monitoring program shown in Table 3. The City of Santa Maria must also report detectable concentrations (above the reporting limit) for any other constituent that has a published maximum contaminant level (MCL).

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
4 The City of Santa Maria must evaluate and provide a tabular summary of the water supply data with the annual monitoring report.

Table 3. Water Supply Monitoring
Constituent Units[1] Sample Type Sampling Frequency
Nitrate (as N) mg/L Grab Annually
Total Dissolved Solids mg/L Grab Annually
Chloride mg/L Grab Annually
Sodium mg/L Grab Annually
Sulfate mg/L Grab Annually
Boron mg/L Grab Annually
Carbonate mg/L Grab Annually
Bicarbonate mg/L Grab Annually
Calcium mg/L Grab Annually
Potassium mg/L Grab Annually
Magnesium mg/L Grab Annually
[1] mg/L denotes milligrams per liter.

III. INFLUENT AND EFFLUENT MONITORING
A. Influent Flow Monitoring – The City of Santa Maria must monitor and report flow in million gallons per day, as described in Table 4, with each monitoring report. See monitoring and reporting program section VI.A.4 for supplemental volumetric annual reporting requirements established by the State Water Board.

Table 4. Influent Flow Monitoring
Parameter Sample Type Sampling Frequency Sample Location Daily Flow Metered Daily IS-1
Maximum
Daily Flow Metered Monthly IS-1
Mean Daily
Flow Calculated Monthly IS-1
Percent of
Permitted
Flow [1]
Calculated Quarterly IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
5 [1] The General Permit notice of applicability specifies the Wastewater System’s maximum permitted flow. In the monitoring reports, the City of Santa Maria must evaluate and provide a comparison of monitored flow to the permitted flow.

B. Wastewater System Monitoring – Representative samples of The City of Santa Maria’s influent (raw wastewater) into the Wastewater System and effluent (treated wastewater) discharged to percolation ponds must be collected and analyzed in accordance with the treatment technology-based monitoring requirements (including sample type and frequency) summarized in the tables below. See Figure 1 for the location of samples and GeoTracker field points.

Figure 1. Process Flow Diagram and Sample Locations Referenced in Table 2 IS-1
ES-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
6 Figure 2. Percolation Pond and Groundwater Monitoring Well Sample Locations Referenced in Table 2
ES-2
ES-3
ES-4
ES-1a
ES-5
ES-6
ES-7
ES-8
ES-DKC
ES-12
ES-11
ES-14
ES-13
ES-15
MW-DMW1
MW-DMW2
MW-UMW1
ES-1
IS-1
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
7 Figure 3. Water Supply and Groundwater Monitoring Well Sample Locations Referenced in Table 2

1. Pond System Monitoring
i. Required Pond Monitoring – All wastewater treatment and treated wastewater storage/disposal ponds (lined and unlined) must be monitored as specified in Table 5. Sampling for dissolved oxygen must be a grab sample taken from 1 foot below pond surface1.

Observations do not need to be reported in the monitoring reports unless a violation, significant change, or treatment issue is observed. Photos of the pond(s) verifying the observations must be collected annually and included in the annual report, with the date and location of the photo clearly marked. Observations must be noted in a logbook or database and made available to the Central Coast Water Board upon request. Any problems must be promptly corrected and recorded.
1 Pond dissolved oxygen sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

MW-5H
MW-DMW2
MW-DMW1
MW-UMW1 MW-5H
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
8 Table 5. Wastewater Treatment/Storage/Disposal Pond Monitoring Parameter/
Constituent Units Sample Type Sampling/MonitoringFrequency Freeboard 0.1 feet Measured Weekly
Dissolved Oxygen
(in pond)[4] mg/L Grab Monthly
Sludge Depth[1] 0.1 feet Measured Annually
Color Not
applicable Observation Monthly
Vegetation in and
surrounding ponds
Not
Applicable Observation Monthly
Berm condition Not
Applicable Observation Monthly
Precipitation inches/day
and date Measured [2] Each precipitation event [3]
[1] Sludge depth will not be required at disposal ponds if the disposal pond was dried and scarified within the reporting year. The annual report must provide dates of when the disposal ponds have been dried and scarified.
[2] The City of Santa Maria may use a rain gauge or use a National Oceanic and Atmospheric Administration, United States Geological Survey, or California Irrigation Management Information System weather station, such as http://scacis.rcc-acis.org/. [3] A precipitation event is one producing precipitation of ½ inch or more. [4] Pond sample collection may be omitted if collection is deemed infeasible or unsafe to perform by the wastewater treatment plant chief plant operator.

2. Trickling Filter System Monitoring
i. Influent and Effluent Monitoring – At a minimum, influent and effluent constituent monitoring for the trickling filter system must be monitored as specified in Table 6.

Table 6. Influent and Effluent Monitoring for Trickling Filter Systems

INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
pH units Grab Weekly Grab Weekly
Biochemical
Oxygen Demand,
5-Day
mg/L 24-hour
composite Quarterly 24-hr composite Monthly
Total Suspended
Solids mg/L 24-hour composite Quarterly 24-hr composite Monthly Settleable Solids ml/L Not
Required Not Required Grab Weekly
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
9 INFLUENT
(IS-1)

INFLUENT
(IS-1)

EFFLUENT
(ES-1)

EFFLUENT
(ES-1)
Parameter/
Constituent Units Sample Type
Sampling
Frequency
Sample
Type
Sampling
Frequency
Total Nitrogen[2] mg/L Calculated Quarterly Calculated Monthly Nitrate (as N) +
Nitrite (as N) mg/L 24-hour composite Quarterly Grab Monthly Total Kjeldahl
Nitrogen (as N) mg/L 24-hour composite Quarterly Grab Monthly Ammonia (as N) mg/L 24-hour
composite Quarterly Grab Monthly
Total Dissolved
Solids mg/L 24-hour composite Quarterly Grab Monthly
Chloride mg/L 24-hour
composite Quarterly Grab Monthly
Sodium mg/L 24-hour
composite Quarterly Grab Monthly
Sulfate mg/L 24-hour
composite Quarterly Grab Monthly
Boron mg/L Not
Required Not Required Grab Monthly
Carbonate mg/L Not
Required Not Required Grab Semiannually
Bicarbonate mg/L Not
Required Not Required Grab Semiannually
Calcium mg/L Not
Required Not Required Grab Semiannually
Potassium mg/L Not
Required Not Required Grab Semiannually
Magnesium mg/L Not
Required Not Required Grab Semiannually
[1] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.

IV. SLUDGE/BIOSOLIDS DISPOSAL MONITORING
The City of Santa Maria must report the handling and disposal of all sludge/biosolids generated at the Wastewater System. Records must include the date removed from the Wastewater System, name/contact information for the hauling company, the type and volume of waste transported, the disposal facility name and address, and copies of analytical data required by the entity accepting the waste. These records must be submitted as part of the annual monitoring report.

The City of Santa Maria must also monitor sludge/biosolids consistent with a Central Coast Water Board approved sludge management plan and in accordance with the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
10 requirements specified by the receiving party, including a regulated landfill and/or regulated composting facility.

If sludge/biosolids are not removed during the year, the City of Santa Maria must explain the absence of this monitoring in the annual report.

V. GROUNDWATER MONITORING
A. General Permit section V.A.2 provides two choices for compliance, effluent limitations, or groundwater monitoring.

In the time schedule compliance plan, the City of Santa Maria must identify if it chooses General Permit section V.A.2 Option 1 or Option 2 for each constituent.

Option 1 is to comply with the effluent limits (refer to notice of applicability Table 7).

Option 2 is to implement a groundwater monitoring program to demonstrate that the discharge does not cause underlying groundwater to exceed the water quality objectives set forth in the Basin Plan (refer to notice of applicability Table 8).

Existing upgradient and downgradient groundwater monitoring wells are located within the percolated effluent mound at the Wastewater System. The current monitoring well network is not adequate for the assessment of upgradient background water quality and/or downgradient water quality trend for the City of Santa Maria Wastewater System (Fugro 2007)2.

By June 16, 2024, (with the time schedule compliance plan) the City of Santa Maria must notify the Central Coast Water Board of the city’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).

If the City of Santa Maria chooses Option 2 for any constituent, by October 16, 2024, the City of Santa Maria must:

1. Submit a groundwater monitoring workplan and preliminary hydrogeologic conceptual site model for Central Coast Water Board approval. At a minimum, the workplan must propose the installation of three shallow groundwater monitoring wells to establish groundwater gradient, groundwater flow velocity and direction, and evaluate downgradient groundwater quality influenced by the wastewater disposal. The number and location of the proposed groundwater monitoring well network must be on a scale sufficient to determine potential impacts and be sufficiently representative of groundwater conditions upgradient and downgradient of the permitted disposal/dispersal area. The groundwater 2 Hydrogeologic and Water Quality Review of Groundwater Conditions for the Wastewater Treatment Plant, Santa Maria, California. Fugro West, Inc. September 2007 MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
11 monitoring wells should not be installed prior to Central Coast Water Board approval of the groundwater monitoring workplan and preliminary hydrogeologic conceptual site model.

The groundwater monitoring wells must be installed within first encountered groundwater and in accordance with California Department of Water Resources Bulletin No. 74-81 and Supplement No. 74-90, California Water Code sections 13710 through 13755, and any local permitting requirements. The locations and top-of-casing elevations for the newly installed monitoring wells must be surveyed by a licensed land surveyor. The City of Santa Maria must install3 the Central Coast Water Board approved groundwater monitoring well network within 90 days of receiving Central Coast Water Board approval.

2. Once installed, all monitoring wells designated as part of the monitoring well network must be, at a minimum, sampled and analyzed as specified in Table 7 and the Central Coast Water Board approved sampling and analysis plan (see section VI.A.2.i of the General Permit).

Prior to sampling, depth to groundwater must be measured and groundwater elevations4 must be calculated. The monitoring wells must be purged of at least three well volumes and until measurements of the following parameters have stabilized (i.e., are reproducible within 10 percent): pH, temperature, dissolved oxygen, electrical conductivity, and turbidity. No-purge, low-flow, or other sampling techniques are acceptable only if they are approved in advance by the Central Coast Water Board and described in an approved sampling and analysis plan. Once the groundwater level in each of the wells has recovered sufficiently to ensure the collection of representative groundwater samples, a qualified individual (e.g., consultant, technician) trained in using proper sampling methods must recover samples using approved USEPA methods. Laboratories analyzing groundwater samples must be accredited by the State Water Board Environmental Laboratory Accreditation Program, in accordance with California Water Code section 13176, and must include quality assurance/quality control data with their reports.

The City of Santa Maria must provide monitoring well field sheets and report monitoring data, as described in Table 7, with each monitoring report.

3. Groundwater monitoring must include and must be consistent with Table 7 if Option 2 is chosen. Some constituents in Table 7 may be removed by the Central 3 Well installation must be supervised by a California licensed Civil Engineer or Professional Geologist. 4 The locations and top-of-casing elevations for the existing groundwater monitoring wells must be surveyed by a licensed land surveyor if not already completed at the time of installation.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
12 Coast Water Board if compliance for that constituent is chosen by the City of Santa Maria to be an effluent limitation.

Table 7. Groundwater Monitoring if Option 2 is Chosen
Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation [1] 0.01 ft amsl Calculated Quarterly Depth to Groundwater [1] 0.01 ft bgs Measurement Quarterly Gradient feet/feet Calculated Quarterly
Groundwater Flow Direction [2] degrees Calculated Quarterly Total Nitrogen[3] mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Total Dissolved Solids mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
Carbonate mg/L Grab Semiannually
Bicarbonate mg/L Grab Semiannually
Calcium mg/L Grab Semiannually
Potassium mg/L Grab Semiannually
Magnesium mg/L Grab Semiannually
pH pH Units Metered Quarterly
Dissolved Oxygen mg/L Metered Quarterly
Phenol [4] mg/L Grab Annual
Formaldehyde [4] mg/L Grab Annual
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
13 Constituent Units Sample
Type
Sampling
Frequency
Zinc [4] mg/L Grab Annual
[1] ft amsl denotes feet above mean sea level and ft bgs denotes feet below ground surface. [2] Calculations must be prepared by, or under the responsible charge of, a California licensed professional.
[3] Total nitrogen is the sum of total inorganic nitrogen (nitrate + nitrite + ammonium + ammonia) and organic nitrogen.
[4] Sampling required once every five years if not detected in initial sample.

4. Groundwater monitoring reports, workplans, and other technical reports that interpret groundwater data must be prepared and stamped by a California licensed civil engineer or professional geologist.

B. GROUNDWATER MONITORING PRIOR TO OCTOBER 16, 2024
Table 8. Groundwater Monitoring Prior to October 16, 2024 Constituent Units Sample
Type
Sampling
Frequency
Groundwater Elevation 0.01 ft amsl Calculated Quarterly Depth to Groundwater 0.01 ft bgs Measurement Quarterly
Total Nitrogen mg/L Calculated Quarterly
Nitrate (as N) mg/L Grab Quarterly
Nitrite (as N) mg/L Grab Quarterly
Total Kjeldahl Nitrogen (as N) mg/L Grab Quarterly
Ammonia (as N) mg/L Grab Quarterly
Chloride mg/L Grab Quarterly
Sodium mg/L Grab Quarterly
Sulfate mg/L Grab Quarterly
Boron mg/L Grab Quarterly
VI. REPORTING REQUIREMENTS
A. QUARTERLY AND ANNUAL MONITORING REPORTS
Quarterly and annual monitoring reports are due as described in Table 9.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
14 Table 9. Quarterly and Annual Monitoring Reporting
Report Monitoring Period Report Due Date
First Quarter Monitoring
Report January 1 to March 31 May 1
Second Quarter Monitoring
Report April 1 to June 30 August 1
Third Quarter Monitoring
Report July 1 to September 30 November 1
Fourth Quarter Monitoring
Report October 1 to December 31 February 1
Annual Monitoring Report January 1 to December 31 March 1 Annual Pretreatment
Program Report January 1 to December 31 March 1
State Water Board
Volumetric Annual
Reporting
January 1 to December 31 April 30

1. Quarterly Monitoring Reporting – At a minimum, the quarterly reports must include:
i. Results of all required monitoring in tabular format. ii. The results of any pollutant or parameter monitored more frequently than is required by this monitoring program. Values obtained through additional monitoring must be used in calculations as appropriate. iii. A comparison of monitoring data to the discharge specifications, applicable effluent limitations, disclosure of any violations of the notice of applicability and/or General Permit, and an explanation of any violation of those requirements. The City of Santa Maria must calculate 7-day averages, 30- day averages and 25-month rolling medians for select analytes when comparing monitoring data to applicable effluent limitations specified in the General Permit. Data must be presented in tabular format. iv. Copies of laboratory analytical report(s) and chain of custody form(s). v. An updated hydrogeologic conceptual site model with the groundwater monitoring reporting requirements based on new information generated from the monitoring well boring logs, groundwater elevation data, and water quality data.
vi. Copies of groundwater monitoring well field sheets with purge methods and data.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
15 2. Annual Monitoring Reporting – The City of Santa Maria must submit annual reports in compliance with Standard Provisions 20135, (and any updates to the Standard Provisions) Section C, General Reporting Requirements, Item 16 using the most recent annual report template provided by Central Coast Water Board.

The current annual report template can be found here:
https://www.waterboards.ca.gov/centralcoast/board_decisions/adopted_orders/2 020/wdr_annual_report_format.pdf

3. Annual Pretreatment Program Report – Pursuant to California Code of Regulations, title 23, section 2233, subdivision (a), because the City of Santa Maria’s Wastewater System is designed to treat over five million gallons a day, the city must have and enforce an adequate pretreatment program approved by the Central Coast Water Board. The City of Santa Maria’s Pretreatment Program was approved by the Environmental Protection Agency (EPA) in 1982. The Pretreatment Program monitors compliance of permitted facilities and attempts to identify and reduce pollutants to both sanitary and stormwater collection systems.

On occasion, there may be a need to modify an existing pretreatment program, as identified by either the City of Santa Maria or the Central Coast Water Board.

These modifications may be driven by a variety of factors such as, but not limited to, a change in conditions at the Wastewater System, a recalculation of local limits (or reallocation of the maximum allowable industrial loading), changes to federal pretreatment regulations, or a change in the industrial user base discharging to the Wastewater System. Substantial modification is defined in title 40 Code of Federal Regulations (CFR) 403.18(b).

For substantial modifications, the City of Santa Maria must submit in writing to the Central Coast Water Board the rationale for the substantial modification, a detailed description of the proposed modification, and other documents considered necessary by Central Coast Water Board staff.

The City of Santa Maria must submit an annual Pretreatment Program report in accordance with title 40 CFR 403.12(i) that describes the City of Santa Maria’s pretreatment program activities, including activities of all participating agencies, if more than one jurisdiction is involved in the program. The report must include, at a minimum, the applicable required data in appendix A to 40 CFR part 127 which requires the following data to be added or updated annually:
i. Pretreatment program approval or modification date
5 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/docs/wdr_standard_provi sions_2013.pdf
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
16 ii. Pretreatment program modification type
iii. Industrial user type
iv. Significant industrial user subject to local limits v. Significant industrial user subject to local limits more stringent than categorical standards
vi. Significant industrial user wastewater flow rate
vii. Industrial user causing problems at the Wastewater System viii. Receiving resource conservation and recovery act (RCRA) waste ix. Receiving remediation waste
The report must also include a summary of changes to the City of Santa Maria’s pretreatment program that have not been previously reported to the Central Coast Water Board and any other relevant information requested by the Central Coast Water Board.

4. State Water Board Volumetric Annual Reporting – The City of Santa Maria must electronically certify and submit a summary of the monthly influent and effluent flow volume by April 30th of each calendar year via the State Water Board’s Internet GeoTracker database.6
The following information is required:
i. Monthly volume of wastewater collected and treated by the wastewater treatment plant (i.e., total monthly influent volume).
ii. Monthly volume of wastewater treated, specifying level of treatment, including treated wastewater discharged.
iii. If applicable, monthly volume of recycled water distributed, and annual volume of treated wastewater distributed for beneficial use in compliance with California Code of Regulations, title 22 use categories.

Additional information about volumetric annual reporting of wastewater and recycled water and the Recycled Water Policy is available at the Recycled Water Policy Volumetric Annual Reporting Website7.
6 See: https://geotracker.waterboards.ca.gov/
7 See: Volumetric Annual Reporting | California State Water Resources Control Board MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
17 B. NON-COMPLIANCE REPORTING:

The City of Santa Maria must notify and report to Central Coast Water Board noncompliance of limits related to pond freeboard, flow rate, bypass or overflow, and wastewater containment failure, pursuant to General Permit section VI.C.2.

C. ELECTRONIC GEOTRACKER SUBMITTAL
All monitoring reports must be provided electronically in a searchable PDF format, with the Central Coast Water Board’s current transmittal sheet found at the link below as the cover page. The transmittal sheet must be signed.
https://www.waterboards.ca.gov/centralcoast/water_issues/programs/wastewater_permi tting/docs/transmittal_sheet.pdf
The City of Santa Maria must submit all reports/documents and laboratory analytical data to the State Water Board’s GeoTracker8,9 database consistent with applicable Electronic Submittal of Information (ESI) requirements under the Wastewater System-specific global identification number WDR100029526 at:
https://geotracker.waterboards.ca.gov/esi/login
For general questions, please contact the GeoTracker Help Desk at:

[email protected].

Table 10 summarizes all the GeoTracker electronic reporting requirements. Central Coast Water Board may request submittal of some documents on paper, particularly drawings or maps that require a large size to be readable, or in other electronic formats where evaluation of data is required.

Table 10. GeoTracker Electronic Submittal Information Data Requirements Electronic
Submittal Description of Action Action Frequency
8 Information for first-time GeoTracker users is available at:
https://www.waterboards.ca.gov/ust/electronic_submittal/docs/beginnerguide2.pdf 9 Additional information available at:
https://geotracker.waterboards.ca.gov/
MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
18 Electronic
Submittal Description of Action Action Frequency
Reports and
Documents
Complete copy of all
documents including
monitoring reports (in
searchable PDF format) and
any other associated
documents related to the
Wastewater System.

Upload directly to
GeoTracker all
monitoring reports (in
searchable PDF
format) and any
other associated
documents.

On or before the due
dates required by this
General Permit and for
other documents when
required by the Central
Coast Water Board.

Laboratory
Data
All analytical data (including
geochemical data) in
electronic deliverable format
(EDF). This includes all
water, soil, and vapor
samples collected when
monitoring a discharge.

Upload, or direct
your California
ELAP-accredited
laboratory staff to
upload, all EDF
laboratory data
directly to
GeoTracker.

On or before the due
date of the required
monitoring report.

Depth to
Groundwater
Monitoring wells must have
the depth-to-water
information reported. Report
data only for wells defined as
permanent sampling points.

Upload depth-to-water information to
the GeoTracker
GEO_WELL file.

On or before the due
date of the required
monitoring report.

Boring Logs
and Well
Screen
Intervals
Boring logs must be prepared
by a registered professional
and submitted in PDF format
separately (not only as
attachments to reports).

Upload boring logs
(in searchable PDF
format) to
GeoTracker
GEO_BORE file
whenever a new
boring is drilled.

Every time a new
boring is drilled.

Field Points,
Location Data
(Geo XY)[1]
Name, classify, and identify
the location (latitude and
longitude) of all sampling
points. Monitoring wells must
be surveyed, influent and
effluent sample locations
must be identified on the
GeoTracker mapping tool
under “non-surveyed data.”
These data points are
required prior to laboratory
data uploads.

Upload the location
data (surveyed and
non-surveyed) to the
GeoTracker Geo_XY
file.

Every time a
permanent monitoring
point is established.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
19 Electronic
Submittal Description of Action Action Frequency
Elevation
Data
(Geo Z)[2]
Survey and mark the
elevation at the top of
groundwater well casings for
all permanent groundwater
wells. These points are
required prior to depth-to-water data uploads.

Upload the survey
data to the
GeoTracker GEO_Z
file.

One-time, for all
groundwater
monitoring wells.

Geo Map
Site layout, map of facilities,
Wastewater System including
treatment and disposal
area(s).

Upload the Site
layout PDF to the
GeoTracker site plan
file.

Year one and every
five years thereafter
and when the facilities
are modified.
[1] Geo XY required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data. The City of Santa Maria must also upload sample locations (e.g., influent and effluent samples) that are not defined as a permanent monitoring well and have not been surveyed by a licensed professional.
[2] Geo Z required for all wells. New wells must be surveyed. For existing wells, use original well installation survey data.

VII. TECHNICAL REPORTS
The technical reports are due as described in Table 11.

Table 11. Technical Report Submittal Due Dates
Report Report Due Date
Operations and Maintenance Manual June 16, 2024
Climate Change Adaptation Plan June 16, 2025
Salt and Nutrient Management Plan Not Applicable
Time Schedule Compliance Plan June 16, 2024
Groundwater Monitoring Plan[1] October 16, 2024
[1] Required if the City of Santa Maria chooses Option 2 described in section V.A.

1. Operations and Maintenance Manual – In addition to the required components specified in Standard Provisions10 A.12 and A.28 (and any updates to the 10 See General Permit Attachment E, Standard Provisions, 2013:
https://www.waterboards.ca.gov/centralcoast/board_decisions/do-cs/wdr_standard_provisions_2013.pdf MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
20 Standard Provisions) and General Permit section VI.A.2, the Operations and Maintenance Manual must contain the following components. Each component must contain an implementation schedule and identification of adequate funding to implement the component.
i. Sampling and Analysis Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sampling and analysis plan that meets the requirements specified herein. Anyone performing sampling on behalf of the City of Santa Maria must be familiar with the sampling and analysis plan. At a minimum, the sampling and analysis plan must contain the following:
a. A wastewater treatment process flow schematic with the monitoring locations labeled and scaled Wastewater System maps with treatment components, discharge locations (both treated wastewater and non-potable recycled water), monitoring locations, groundwater wells, storage locations (e.g., chemical, sludge, emergency overflow ponds), and buildings. If the City of Santa Maria needs to update Figure 1 to comply with this requirement, a copy of the updated process flow schematic will also be included with the annual report. b. Sample identification details in tabular format. The table must include the sample titles, GeoTracker field point information, sample description(s), and sampling frequencies.
c. Sample chain-of-custody procedures and documentation. d. Sample handling/preservation procedures.
e. A description of the analytical methods.
f. A description of sample containers, preservatives, and holding times. g. For water supply monitoring, a description of the location and method of data collection (e.g., onsite well sampling, use of consumer confidence report).
h. For groundwater monitoring, a description of the well purging and field methods.
ii. Sludge Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a sludge management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the plan must describe the following:

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
21 a. An estimated volume/amount and quality of sludge and scum that will be generated.
b. How sludge, scum, and supernatant will be stored and disposed of to protect groundwater quality.
c. If sludge will be subject to further treatment, describe the treatment and storage requirements.
d. Procedures for cleaning of digesters or storage vessels and the treatment and disposal of the residuals. If drying of residuals is planned, describe how that will be performed to prevent nuisance odors, prevent vectors, and protect groundwater quality. iii. Wastewater Disposal Management Plan – The City of Santa Maria’s Operation and Maintenance Manual must contain a wastewater disposal management plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. At a minimum, the wastewater disposal management plan must include:
a. A description of the wastewater disposal area and a map denoting acreage.
b. Loading calculations based on flow volumes, applied acreage, and biochemical oxygen demand, salts (total dissolved solids, sodium, chloride, sulfate, boron), and nitrogen analytical results. c. A description of wastewater disposal and water quality protection practices.
iv. Spill Prevention and Emergency Response Plan –The City of Santa Maria’s Operation and Maintenance Manual must contain a spill prevention and emergency response plan that is sufficient to ensure compliance with the terms of the General Permit and the notice of applicability. The spill prevention and emergency response plan must describe operation and maintenance activities to prevent accidental releases of wastewater and to effectively respond to such releases and minimize the environmental impact. At a minimum, the spill prevention and emergency response plan must address the following:
a. Operation and Control of Wastewater System - A description of the wastewater treatment equipment, operational controls, flow measurement and calibration procedures, and treatment system schematic including valve/gate locations.
b. Sludge Handling - A description of the sludge handling equipment, operational controls, and disposal procedures.
c. Collection System Maintenance - A description of collection system cleaning and maintenance, equipment tests, and alarm functionality tests to minimize the potential for wastewater spills originating in the MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
22 collection system or headworks. For collection systems subject to State Water Board Order WQ 2022-0103-DWQ, Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (or its replacement), reports prepared to comply with State Water Board Order WQ 2022-0103-DWQ satisfy this requirement.
d. Emergency Response - A description of emergency response procedures including for emergencies such as power outage, severe weather, flooding, or inadequate freeboard (for systems with wastewater treatment, storage, or disposal ponds or treated non-potable recycled water storage ponds). An equipment and telephone list for contractors/consultants, emergency personnel, and equipment vendors.
e. Finance - At a minimum, discuss current fees, projected fees, current budget for spill prevention and emergency response, projected budget for spill prevention and emergency response.
f. Notification Procedures - Coordination procedures with fire, police, Governor’s Office of Emergency Services (CalOES), Central Coast Water Board, and local county health department personnel. v. Training Records Log – The City of Santa Maria’s Operation and Maintenance Manual must contain updated training records logs that demonstrate the City of Santa Maria is complying with General Permit section VI.B.3.

2. Climate Change Adaptation –The Climate Change Adaptation Plan must, at a minimum, include the following components:
i. Hazards and Vulnerabilities – Identify climate change hazards, at a minimum accounting for the hazards listed below, applicable to the Wastewater System. Using up-to-date tools, data, and guidance from the State of California (e.g., Cal-Adapt11, Sea-Level Rise Guidance from Ocean Protection Council, reports from the Climate-Safe Infrastructure 11 Cal-Adapt is an online resource with downscaled climate project data. It provides users with projections and more detailed downloadable data supporting a range of needs and array of climate models and emissions scenarios. Cal-Adapt offers climate projections for the major stressors facing California, including the following: temperature averages and extremes, precipitation averages and extremes, sea-level rise, wildfires, and drought. The Governor’s Office of Planning and Research (OPR) recommends agencies use Representative Concentration Pathway (RCP) 8.5 for analyses considering impacts through 2050, because there are minimal differences between emissions scenarios during the first half of the 21st century.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
23 Working Group, the Climate Adaptation Planning Guide, and California Climate Assessment Regional Reports), assess the Wastewater System’s vulnerability to identified hazards that could cause reduction, loss, or failure of treatment processes and/or critical structures at the Wastewater System. Identify and justify the resources (e.g., models and tools, design parameters) used to inform identification of these hazards and vulnerabilities.
a. Sea Level Rise – Saltwater intrusion, flooding and inundation, and increased coastal erosion.
b. Precipitation Pattern Changes.

I. Drought – Decreased influent quantity and quality.

II. Peak Events – Flooding and increased influent quantity. c. Temperature fluctuations and extremes.
d. Increased wildfires.
e. Increased power outages.
ii. Resiliency Actions – Identify actions to build Wastewater System and operational resilience to identified vulnerabilities, accounting for options that minimize resource impacts.
iii. Adaptation Strategy – For Wastewater Systems with design flows over 1,000,000 gallons per day, develop and implement a strategy to complete resiliency actions, at a minimum encompassing the following:
a. Prioritization – Prioritized resiliency actions based on risks to water quality, but also accounting for costs and benefits.
b. Schedule and Milestones – Timeframes to complete prioritized resiliency actions and/or climate change hazard triggers to inform when the City of Santa Maria must implement actions. Milestones to complete critical steps for prioritized resiliency actions, designed to demonstrate measurable progress at a steady, or accelerated, completion pace over the established timeframes.
c. Financial Planning – Projected costs necessary to implement and sustain resiliency actions and strategy to procure funds. iv. Recycled Water Feasibility Plan – Dischargers with Wastewater System design flows over 1,000,000 gallons per day must include a recycled water feasibility plan.

The recycled water feasibility plan will assess the viability of using the Wastewater System’s treated wastewater effluent for beneficial reuse including, but not limited to the following:
a. Beneficial Reuse Options – Identification of reuse opportunities for the City of Santa Maria’s treated effluent that would achieve the highest beneficial impact and best uses possible of non-potable recycled MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
24 water. Include assessment of the following non-potable recycled water benefits identified in the State Water Board Recycled Water Policy:
providing safe alternatives to fresh water or potable water for approved uses; supporting sustainable groundwater and surface water uses with the intent of substituting use of treated effluent for use of fresh water or potable water; and diversifying community water supplies and mitigating for the impacts of climate change.12
b. Viable Users – Identification and viability evaluation of all potential users of the Wastewater System’s treated effluent associated with identified beneficial reuse options. The City of Santa Maria must demonstrate it engaged potential water purveyors and customers about the viability of reusing the Wastewater System’s treated effluent. c. Infrastructure Upgrades – Assessment of infrastructure needs to produce non-potable recycled water for identified beneficial reuses and convey non-potable recycled water to beneficial reuse locations. d. Fiscal Analysis – Cost estimates for identified reuse options, at a minimum including project development, construction, and long-term maintenance and lifecycle costs. This analysis shall also include identification and evaluation of the following: 1) funding options, including at a minimum, revenues from recycled water sales, grant and loan funding opportunities, and financing from other benefitting parties and 2) funding limitations.
e. Schedule and Milestones for Next Steps – Timeframes to assess the feasibility of identified beneficial reuse options and to identify proposed beneficial reuse options based on prioritized water recycling and reuse opportunities, feasibility assessments, and other factors identified by the City of Santa Maria.
f. Identification of implementation schedule and adequate funding to implement the plan.

3. Salt and Nutrient Management Plan – The City of Santa Maria is an active cooperating partner of the Santa Barbara County Integrated Regional Water Management (IRWM) Plan’s regional water management group. The regional water management group prepared and submitted an assessment of the Santa Maria Valley Groundwater basin to the Central Coast Water Board. The assessment concluded that the dischargers participating in the workgroup were in balance for salts and nutrients in 2013. A salt and nutrient management plan is 12 Water Quality Control Policy for Recycled Water, State Water Board, adopted December 11, 2018, page 1.

MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
25 currently not required while the City of Santa Maria participates in the Santa Barbara County IRWM regional water management group.

4. Time Schedule Compliance Plan - As set forth in General Permit sections V.A and VI.A.5, if the City of Santa Maria anticipates that additional time is needed to achieve compliance with the effluent limitations, the City of Santa Maria must prepare and submit for Central Coast Water Board review and approval, a time schedule compliance plan. At a minimum, the time schedule compliance plan must address the following:
i. Comparison of the current effluent quality to the effluent and groundwater limitations in General Permit Tables 3-6.
ii. Identification of the City of Santa Maria’s choice for compliance for each constituent pursuant to General Permit section V.A.2 Option 1 or Option 2 (complying with an effluent limit or demonstrating compliance through a groundwater monitoring program).
iii. A detailed description and chronology of efforts, since issuance of the notice of applicability, to reduce wastes.
iv. Justification of the need for additional time to achieve the effluent limitations in General Permit Tables 3-6.
v. A detailed time schedule of specific actions the City of Santa Maria will take to achieve the effluent limitations.
vi. A demonstration that the time schedule requested is as short as possible, considering the technological, operation, and economic factors that affect the design, development, and implementation of the measures that are necessary to comply with the effluent limitation(s).
vii. If the requested time schedule exceeds one year, the proposed schedule shall include interim requirements and the date(s) for their achievement. The interim requirements shall include both of the following:
a. Effluent limitation(s) for the pollutant(s) of concern. b. Actions, measurable milestones, and tangible products leading to compliance with the effluent limitation(s).

VIII. LEGAL REQUIREMENTS
The Central Coast Water Board’s requirements that the City of Santa Maria submit the technical and monitoring reports described in this monitoring and reporting program are made pursuant to section 13267 of the California Water Code. Failure to submit reports in accordance with schedules established by this General Permit and notice of applicability with attachments or failure to submit a report of sufficient technical quality to be acceptable to the Central Coast Water Board may subject the City of Santa Maria to enforcement action pursuant to section 13268 of the California Water Code. Pursuant to section 13268 of the Water Code, a violation of a request made pursuant to section MRP No. R3-2023-0032 June 16, 2023
City of Santa Maria Wastewater Treatment System
26 13267 may subject the City of Santa Maria to civil liability assessment of up to $1,000 per day in which the violation occurs.

The Central Coast Water Board needs the required information to ensure compliance with the notice of applicability and the General Permit. The City of Santa Maria is required to submit this information because it is subject to the General Permit and is responsible for the discharge.

The burden, including costs, of the reports bears a reasonable relationship to their need and the benefits to be obtained. The requirement for the reports is necessary to ensure compliance with the General Permit, notice of applicability, and monitoring and reporting program to protect water quality.

The City of Santa Maria must implement the above monitoring program on October 1, 2023. The Central Coast Water Board may rescind or modify this monitoring and reporting program at any time.

Ordered By:

for Matthew T. Keeling
Executive Officer
\\ca.epa.local\RB\RB3\Shared\WDR\WDR Facilities\Santa Barbara Co\Santa Maria WWTP\Order 2020-0020\final\Santa Maria_MRP_ R3-2023-0032_final.docx Solids Waste
Facility Permit
Facility Number:

SOLID WASTE FACILITY PERMIT 42-AA-0016

1. Name and Street Address of Facility:

Santa Maria Regional Landfill
2065 East Main Street
Santa Maria, CA. 93454

4. Specifications:

2. Name and Mailing Address of Operator:

City of Santa Maria
2065 East Main Street
Santa Maria, CA. 93454

3. Name and Mailing Address of Owner:

City of Santa Maria
2065 East Main Street
Santa Maria, CA. 93454
a. Permitted Operations: Solid Waste Disposal Site D Transformation Facility D Transfer/Processing Facility (MRF) D Composting Facility D Other: __
b. Permitted Hours of Operation:
c. Permitted Maximum Tonnage:
d. Permitted Traffic Volume:
(Receipt of Refuse/Waste) 4:00 a.m. to 7:00 p.m. Sunday to Saturday, closed holidays. (Ancillary Operations/Facility Operating Hours) Agricultural Plastic Baling and the Concrete and Asphalt Recycling operations may operate 24 hours per day Sunday to Saturday, closed holidays.
8,820 Tons per Week (Disposal), (See EA Conditions 17-d). 810 Vehicles per Day
e. Key Design Parameters (Detailed parameters are shown on site plans bearing EA and CalRecycle validations):

Permitted Area (in acres)
Design Capacity ( cu. yds)
Max. Elevation (Ft. MSL) Max. Depth (Ft. MSL)
Estimated Closure Year
Total
290.88
Disposal
247.16
15,278,400
410
265
2034
Transfer/Processing Composting Transformation
Upon a significant change in design or operation from that described herein, this permit is subject to revocation or suspension. The attached permit findings and conditions are integral parts of this permit and supersede the conditions of any previously issued solid waste facility permit.

5. Approval:

Lars Seifert, Director Environmental Health Services
ag ~:tu,e

7. Date Received by CalRecycle:

May 16, 2024

6. Enforcement Agency Name and Address:

Santa Barbara County, Environmental Health Services
225 Camino de! Remedio
Santa Barbara, CA. 93110

8. CalRecyde Concurrence Date:

June 27, 2024

9. Permit Issued Date: 10. Permit Review Due Date: 11. Owner/Operator Transfer Date:

May 7, 2029

Page 1 of 4 ends
Page 2 of 4 ends

SOLID WASTE FACILITY PERMIT
Facility Number:
42-AA-0016

12. Legal Description of Facility:

The legal description of this facility is contained in Section 3.3.4 of the Joint Technical Document dated February 2, 2024.

Legal description of facility: Sections 7, 8, 16, and 17, Township 10 North, Range 33 West, and Sections 1 and 12, Township 10 North, Range 34 West, San Bernardino Baseline and Meridian (SBB&M).

13. Findings:
a. This permit is consistent with the Santa Barbara County Integrated Waste Management Plan, which was approved by the CIWMB on 5/98. The location of the facility is identified in the Countywide Sitting Element, pursuant to Public Resources Code (PRC), Section 50001(a).
b. This permit is consistent with the standards adopted by CalRecycle, pursuant to PRC 44010. c. The design and operation of the facility is consistent with the State Minimum Standards for Solid Waste Handling and Disposal as determined by the enforcement agency, pursuant to PRC 44009. d. The Santa Maria City Fire Department has determined that the facility is in conformance with applicable fire standards, pursuant to PRC, 44151.
e. The 1993 Final Environmental Impact Report (EIR), 1995 Supplement to the EIR, 2001 Addendum to the EIR, 2004 Second Supplemental EIR (SEIR), 2018 Addendum to the Second SEIR, 2021 second Addendum to the Second SEIR, and 2023 Addendum to the Second Final Supplemental EIR were certified or approved by the Santa Maria City Council on 12/93, 9/95, 5/01, 7/04, 5/18, 3/21 and 12/23. The 1993 EIR, 1995 Supplement to the EIR, and 2004 Second SEIR were filed with the State Clearinghouse (SCH #1992031045). A NOE was filed in September 2009 for a Co-gen Plant and to clarify the amount of Agricultural Plastic received. These documents describe and support the design and operation, which will be authorized by the issuance of this permit.

14. Prohibitions:

The permittee is prohibited from accepting the following wastes:

Hazardous, radioactive, medical (as defined in Health and Safety Code Sections 117600-118360), liquid, designated, burning waste, hot ashes, or other wastes requiring special treatment or handling, except as identified in the Joint Technical Document/Report of Facility Information and approved amendments thereto and as approved by the enforcement agency.

15. The following documents describe and/or restrict the operation of this facility:

Date Date
Joint Technical Document & Amendment 2/24 Preliminary and Partial Final Closure and Postclosure Maintenance Plan 02/05/24
Waste Discharge Requirements
Order No. R3-2020-0001
12/22 Closure Financial Assurance Documentation 06/30/23 APCD Permit to Operate #10318-R3 8/17 Operating Liability Certification 09/12/23 EIR, Supplemental EIR, EIR Addendum,
Final Second Supplemental EIR, Addendum
to Final Second SEIR, second Addendum to
Final Second SEIR and 2023 Addendum to
the Second Final Supplemental EIR.
(SCH # 1992031045)
12/93, 9/95,
5/01, 7/04,
5/18, 3/21 and
12/23
Land Use and/or Conditional Use Permit(s) 7/01
Notice of Exemption/Cat. Class 8 & 29 9/09
Static and Seismic Slope Stability Analysis Cell 1
Height Increase
Static and Seismic Slope Stability Analysis Cell 1
Extension
5/18
1/21&
12/23

Page 3 of 4 ends

SOLID WASTE FACILITY PERMIT
Facility Number:
42-AA-0016

16. Self Monitoring:

Unless otherwise specified, the owner/operator shall submit the results of all self monitoring programs to the Enforcement Agency within 30 days of the end of the reporting period (for example, 1st quarter = January – March, the report is due by April 30, etc.. Information required on an annual basis shall be submitted with the 4th quarter monitoring report, unless otherwise stated.)
Program Reporting Frequency
a. The types and quantities (in tons) of waste, including separated or commingled recyclables, entering the facility per day. In addition, the amount of materials used as on-site ADC must be reported.
b. The number and types of vehicles using the facility per day. c. Results of the hazardous waste load checking program, including the quantities and types of hazardous wastes, medical wastes or otherwise prohibited wastes found in the waste stream and the disposition of these materials. Include record of any waste loads rejected. d. Copies of all written complaints regarding this facility and the operator's actions taken to resolve these complaints.
e. Results of landfill gas monitoring program.
f. Wet weather preparedness report/winter operations plan. g. Fill sequencing plan for forthcoming year.
h. Remaining site capacity.
i. Special Occurrences (see condition 17-b)
j. The areas of the site that were used for disposal.
k. A current list of responsible personnel for this facility. This list shall include the name and emergency phone number for the following personnel; the Site Manager, the Duty Supervisor, and any on site Contractors.

Quarterly
Quarterly
Quarterly
Quarterly
Quarterly
Annually – due by October 1
Annually
Annually
Daily log maintained on site;
summary provided in quarterly
tonnage report
Quarterly
Annually

Page 4 of 4 ends

SOLID WASTE FACILITY PERMIT
Facility Number:
42-AA-0016

17. Enforcement Agency (EA) Conditions:
a. The operator shall comply with all State Minimum Standards for solid waste handling and disposal as specified in Title 27, California Code of Regulations.
b. The operator shall maintain a log of special/unusual occurrences. This log shall include, but is not limited to, fires, explosions, the discharge and disposition of hazardous or unpermitted wastes, and significant injuries, accidents or property damage. Each log entry shall be accompanied by a summary of any actions taken by the operator to mitigate the occurrence. The log shall be available to site personnel and the EA at all times.
c. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time frame specified by the EA.
d. The maximum permitted throughput for this facility is 17,640 tons per week (TPW) (based on an average of 2,520 tons per day (TPD)) with a 7-day maximum for solid waste disposal of 8,820 TPW of non-hazardous solid waste (based on an average of 1,260 TPD), and a 7-day maximum of 8,820 TPW for recyclables, diversion, and beneficial reuse (based on an average of 1,260 TPD). In addition to the daily limit, agricultural plastic received for recycling is limited to 15,000 tons per year. This facility shall not receive more than the amounts indicated above without a revision of this permit. The tonnage limits indicated above do not apply to clean earthen materials, Non-hazardous Hydrocarbon Impacted Soils (NHIS), biosolids used as final landfill cover soil amendment, biosolids used as erosion control repair material, or materials received ready for use as Alternative Daily Cover (ADC). e. This permit is subject to review by the EA and may be temporarily suspended or revoked at any time by the EA for sufficient cause, in accordance with Division 30 of the Public Resources Code, Part 4, Chapter 4 Article 2, Sections 44305 et seq. f. The EA reserves the right to suspend or modify waste receiving and handling operations when deemed necessary due to an emergency, a potential health hazard, or the creation of a public nuisance. g. Any change that would cause the design or operation of the facility not to conform to the terms and conditions of this permit is prohibited.

Such a change may be considered a significant change, requiring a permit revision. In no case shall the operator implement any change without first submitting a written notice of the proposed change, in the form of an RFI amendment, to the EA at least 180 days in advance of the change.
h. A copy of this permit shall be maintained at the facility. i. Site Elevation: - This site is designed into 4 sections; the Inactive Area, the Closed Active Area, the Active Area (Cell 1), and an Undeveloped Active Area (Cell 2). The Inactive Area has not received waste since the 1960’s. The Inactive Area has been graded and several feet of additional cover has been applied. The City of Santa Maria is currently using Non-Hazardous Impacted Soil (NHIS) as foundation material for closure construction of the Closed Active Area per approval of WDR R3-2020-0001. The Closed Active Area, the Active Area, and Undeveloped Cell 2’s elevations cannot exceed the maximum elevation, as specified in the Approved Preliminary/Partial Final Closure Plan.

The maximum elevation for the Active Area (Cell 1/Cell 1 Extension) will be 410’ MSL. j. The maximum depth for the Undeveloped Active Area (Cell 2) is 265’ MSL or at least 5 feet above the highest recorded groundwater level, whichever is highest.
k. Adequate lighting shall be provided for all operations conducted before sunrise or after sunset as described in the most current JTD. l. Site access shall be granted to the LEA for the purpose of inspection without prior notice from the LEA. m. Storage of baled and un-baled Agricultural Plastic shall be restricted to individual piles which do not exceed 5000 square feet of contiguous area and any pile shall not exceed 50,000 cubic feet nor 10 feet in height as described in the JTD.

Santa Barbara
County Air Pollution
Control District
Permit
Permit to Operate 08390 - R11

Page 1 of 14 ends

EQUIPMENT OWNER:

City of Santa Maria
EQUIPMENT OPERATOR:

City of Santa Maria
EQUIPMENT LOCATION:
601 Black Road, Santa Maria
STATIONARY SOURCE/FACILITY:

EQUIPMENT DESCRIPTION:

The equipment subject to this permit is listed in the table at the end of this permit.

PROJECT/PROCESS DESCRIPTION:

The City of Santa Maria treats its municipal wastewater (sewage) at this plant. Influent is separated by mechanical bar screens and a grit chamber. The wastewater is then sent through primary clarifiers and trickling filters and secondary clarifiers and trickling filters for aerobic treatment. Treated wastewater is then sent to percolation ponds for disposal.

Solids from the aerobic treatment system are sent to sludge thickeners, the sludge is treated anaerobically in the digesters. The anaerobic digesters are each equipped with a pressure and vacuum relief value to avoid under and over-pressurization. Anaerobic decomposition generates methane that is burned in a boiler or two waste gas flares.

Ferrous chloride is injected in the sludge as needed to reduce the concentration of hydrogen sulfide and sulfur compounds in the digester gas. An iron sponge scrubber is used as needed to further reduce hydrogen sulfide concentrations to permitted emission limits. The plant is currently rated for treating 13.5 million gallons per day of raw sewage in a peak month.

SSID: 02077
City of Santa Maria WWTP FID: 02077
Permit to Operate 08390 - R11

Page 2 of 14 ends

CONDITIONS:

1. Emission Limitations. The mass emissions from the equipment permitted herein shall not exceed the values listed in Table 1 and Table 2. Compliance shall be based on the operational, monitoring, recordkeeping and reporting conditions of this permit.

2. Operational Restrictions. The equipment permitted herein is subject to the following operational restrictions:
a. Maximum combined heat input to the waste gas flares and pilots shall not exceed

12.145 MMBtu/hr, 291.480 MMBtu/day, and 106,390.200 MMBtu/year. b. The volume of digester gas burned daily in the waste gas flares shall not exceed 478,200 scf/day (total monthly amount ÷ number of days per month of gas usage). c. The combined volume of propane burned daily in the Waste Gas Flare 1 and Waste Gas Flare 2 pilots shall not exceed 1,800 scf/day (total monthly amount ÷ number of days per month of gas usage).
d. Only digester gas shall be burned in the flares.
e. Only propane shall be used as fuel for the flare pilots. f. When not in operation, Waste Gas Flare 2 shall be maintained in a ready condition for immediate operation upon demand.
g. The flares shall be equipped with a shared, properly functioning flow meter for propane installed upstream the combustion units. This meter shall be calibrated in accordance with the manufacturer’s specifications and recommendations h. Heat Input Limits. The hourly, daily and annual heat input limits to Boiler 1 shall not exceed the values listed in Table 3. These limits are based on the design rating of the unit and the annual heat input value as listed in the permit application. Unless otherwise designated by the District, the following fuel content shall be used for determining compliance: Digester Gas = 600 Btu/scf, Propane = 2,522 Btu/scf. i. The volume of fuel burned daily in Boiler 1 shall not exceed any of the following:
i. 100,400 scf/day of digester gas
ii. 23,885 scf/day of gaseous propane
iii. 652.62 gals/day of liquid propane
Compliance shall be based on the total monthly amount ÷ number of days per month of fuel usage.

Permit to Operate 08390 - R11

Page 3 of 14 ends

j. Boiler 1 shall only combust digester gas or propane. k. Non-resettable totalizing fuel meters shall be used to measure the fuel input to Boiler 1.

This meter shall be calibrated at least annually in accordance with the manufacturer’s specifications and recommendations.
l. Boiler 1’s low emission kit shall be maintained and operated in accordance with the manufacturer’s specifications and requirements.
m. The total sulfur content (calculated as H2S at standard conditions, 60 °F and 14.7 psia) of gaseous fuels for all fuel burning equipment shall not exceed 50 grains per 100 cubic feet (796 ppmv).
n. The facility operator shall maintain a hydrogen sulfide awareness program so that its employees are aware of and are properly trained to respond to any emergency involving the release of hydrogen sulfide.
o. Incineration of sludge is prohibited.
p. Except for breakdown conditions defined in District Rule 505, venting of digester gas is prohibited.
q. Any replacement of the exempt boiler (Device ID: 104101) must comply with the requirements of District Rule 360 (Boilers, Water Heaters, and Process Heaters (0.075 – 2 MMBtu/hr).

3. Monitoring. The equipment permitted herein is subject to the following monitoring requirements:
a. Daily volume of digester gas combusted in the flares shall be monitored. The daily volumes shall be calculated by dividing the total monthly volume (scf) by the number of days per month. Flowmeters for quantifying the total volume (scf) of produced digester gas shall be checked weekly and maintained to ensure proper operation. b. Daily volume of propane combusted in the flares’ pilots shall be monitored. The daily volumes shall be calculated by dividing the total monthly volume (scf) by the number of days per month. Flowmeters for quantifying the total volume (scf) of propane shall be checked weekly and maintained to ensure proper operation.

Permit to Operate 08390 - R11

Page 4 of 14 ends

c. The volume (scf) of digester gas and propane combusted in Boiler 1 used shall be measured through the use of a dedicated District-approved fuel meters. The meters shall be temperature and pressure corrected. The fuel meters shall be accurate to within five percent (5%) of the full-scale reading. The meters shall be calibrated according to manufacturer’s specifications and the calibration records shall be made available to the District upon request. Additionally, flowmeters for quantifying the total volume (scf) of produced digester gas and propane shall be checked weekly and maintained to ensure proper operation.
d. Compliance Determination. The following compliance determinations are applicable to Boiler 1:
i. New/Modified Units Rated Between 2.0 - 5.0 MMBtu/hr – Not Fired on Utility Natural Gas. Any owner or operator of any unit not fired exclusively on utility natural gas shall perform District-approved source testing not less than once every 24 months using the source test methods listed in Section H of Rule 361. After the third required compliance source test, the District may, at its discretion, allow the owner or operator of the unit to perform tune-ups in lieu of source testing per the requirements of Section G.
ii. Rule 361 Non-Operational Test Firing. No tune-up is required during a calendar year for any unit subject to Rule 361 that is not operated during that calendar year.

This unit may be test fired to verify availability of the unit for its intended use but once test firing is completed it shall be shutdown. If test firing exceeds 24 hours per year, then tune-ups shall follow the requirements of Rule 361.G.1. e. Daily checks shall be performed to determine if, and when, the fuel supplied to Boiler 1 is switched to propane.
f. The permittee shall measure the hydrogen sulfide concentration of the digester gas on a daily basis in accordance with current ASTM-D1072 method, colorimetric gas detection tubes, or other District-approved equivalent method.

These measurements shall be taken every day between 4:00 am – 11:00 am. The operator shall record the date and time as well as initial the record to certify when the measurement was taken. These records shall be made available for District inspection upon request.
g. Three ambient H2S monitors shall be in place and operational at all times to detect releases of digester gas.
h. On an annual basis, the heating value (Btu/scf) of the digester gas fuel shall be measured using ASTM D-1945 method, or by a District-approved equivalent method.

Permit to Operate 08390 - R11

Page 5 of 14 ends

i. The daily volume (scf) of digester gas produced shall be monitored with gas totalizers and recorded digitally in accordance with the Emission and Digester Gas Monitoring Plan requirements.
j. The digesters, gas piping, and pressure regulators shall be inspected for leaks daily. The pressure safety valves shall be inspected for leaks quarterly. k. Daily logs detailing inspection and maintenance activities shall be maintained.

4. Recordkeeping. The permittee shall record and maintain the following information. This data shall be maintained for a minimum of three (3) years from the date of each entry and made available to the District upon request:
a. Daily volume (scf/day) of digester gas combusted in the waste gas flares for each month.

The daily volumes shall be calculated by dividing the total monthly volume (scf) by the number of days per month.
b. Daily volumes (scf/day) of propane gas combusted in the waste gas flare pilots for each month. The daily volumes shall be calculated by dividing the total monthly volume (scf) by the number of days per month.
c. Number of days that the waste gas flares operation.
d. The volumes (scf) of digester gas and propane combust each month in Boiler 1. e. The number of days that Boiler 1 operated on digester gas each month. f. The number of days that Boiler 1 operated on propane gas each month. g. The dates and times the fuel supplied to Boiler 1 is switched to propane and returned to digester gas.
h. Tuning Records. For units subject to Rule 361 tuning requirements, copies of all Rule 361 Tune-Up Reports as specified in Step 12 of Procedure A and/or Step 6 of Procedure B of the tuning Attachment to Rule 361.
i. Rule 361 Non-Operational Test Firing. A log that documents the date and number of hours that the unit was test fired in accordance with Rule 361.I.3. j. Measurements of the daily total sulfur content (ppmv) of the digester gas, taken in accordance with Condition 3.f of this permit.
k. The heating value of the digester gas fuel as measured in accordance with Condition 3.h.

Permit to Operate 08390 - R11

Page 6 of 14 ends

l. Records of the date and time of any leaks detected from the digesters, gas piping, pressure regulators, or pressure safety valves. Records of any repair actions taken to stop the leaks and the date and time that the leaks were stopped. m. The dates and times of any ambient H2S alarms, the cause of the alarms, and any corrective actions taken to stop the H2S release.
n. Maintenance and calibration records of Boiler 1, fuel flow meters, and burner (as applicable).
o. Source test reports for all District-required stack emission tests.

5. Reporting. By March 1st of each year, a written report documenting compliance with the terms and conditions of this permit for the previous calendar year shall be provided by the permittee to the District (Attn: Annual Report Coordinator). The report shall contain information necessary to verify compliance with the emission limits and other requirements of this permit.

The report shall be in a format approved by the District. All logs and other basic source data not included in the report shall be made available to the District upon request. The report shall include the following information:
a. The daily and yearly total volume (scf) of digester gas combusted in the waste gas flares. b. The daily and yearly total volume (scf) of propane gas combusted in the waste gas flare pilots.
c. The number of days of waste gas flare operation summarized monthly and annually. d. The monthly and yearly volumes (scf) of digester gas and propane combusted in Boiler 1.
e. The number of days that Boiler 1 operated on digester gas summarized monthly and annually.
f. The number of days that Boiler 1 operated on propane gas summarized monthly and annually.
g. The dates and times the fuel supplied to Boiler 1 is switched to propane and returned to digester gas.
h. Tune-Up Reports. Tuning Records as required in the Recordkeeping Condition above. i. Rule 361 Test Firing Records. A copy of the Rule 361 Non-Operational Test Firing log. j. Records of the daily digester gas sulfur concentration (as H2S) content measurements including the date and time that the sample was taken.

Permit to Operate 08390 - R11