Vendor · Energy
Motive Energy
Contract actions with Motive Energy in California city council documents since 2022 — also written as Motive Energy Storage Solutions LLC; Motive Energy Storage Solutions, Inc.; Motive Energy Storage Systems, Inc.; Motive Energy Storage Systems, Inc. (MESSI); Motive Energy Storage Systems, LLC.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
7actions
6cities
$11,585,116approved (recorded vote)
$949,474proposed, no vote in the index
2023-09-05first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-08-25 | Glendale | Glendale Water and Power, re: City Owned Solar Program – Brand Park Solar Photovoltaic System Project Contract Award check Solar and solar PPAs | Award | $3,790,797 not to exceed | 1.8 MW | Approved Ayes: Asatryan, Bartrosouf, Brotman, Kassakhian; Noes: Gharpetian; Absent:… | staff report · staff report · agenda · minutes · packet |
| 2026-08-17 | Pasadena | AUTHORIZE THE CITY MANAGER TO ENTER INTO A CONTRACT WITH MOTIVE ENERGY STORAGE SYSTEMS, LLC FOR THE MAINTENANCE YARDS ELECTRIC VEHICLE CHARGER EXPANSION PROJECT EV charging | Award | $949,474 not to exceed | No vote recorded | staff report · agenda · minutes · other · city original | |
| 2026-07-20 | Port Hueneme | AWARD OF A THREE-YEAR CONTRACT TO MOTIVE ENERGY, FOR THE CLEANING, MONITORING AND PREVENTATIVE MAINTENANCE OF THE CITY OWNED SOLAR PANELS Solar and solar PPAs | Award | $29,886 | 375 solar panels and 6 inverters at 3 locations $2,400 per cleaning visit; $1,800 monthly monitoring; $240 per inverte… | Approved Motion passed 5-0, by Roll Call Vote | agenda · minutes · packet · packet · packet |
| 2026-06-02 | Beaumont | Award of Contract for WWTP Solar Generation Project (CIP WW26-04) check Solar and solar PPAs | Award | $2,819,453 | 820 kW solar project $2,720.42 per KW for PV system installation annual cost savings conservatively estimated at $135,800 in 2027 | Approved Approved by a unanimous vote | minutes · packet · packet · packet · city original |
| 2024-11-05 | Big Bear Lake | DWP Monthly Update – July 2024 (Monthly & Miscellaneous Reports) Solar and solar PPAs | Award | $97,800 | Approved | packet · packet · packet · city original | |
| 2023-11-14 | Glendale | Motion authorizing City Manager to execute contract with Motive Energy Storage Systems, Inc. for EPC of solar PV design and engineering at Brand Landfill, not t check Solar and solar PPAs | Award | $173,965 | Approved Ayes: Asatryan, Devine, Kassakhian, Najarian, Brotman | staff report · agenda · minutes · packet · packet | |
| 2023-09-05 | West Covina | CONSIDERATION OF ACCEPTANCE OF WORK FOR SOLAR PV SYSTEM CONSTRUCTION PROJECT - PROJECT NO. 20418 Solar and solar PPAs | Other | $4,673,215 | 1285kW-DC rooftop mounted and carport solar systems at four sites | Approved 5-0 | agenda · packet · packet · city original |
Cities
Beaumont · Big Bear Lake · Glendale · Pasadena · Port Hueneme · West Covina