ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
PAINTING
09 10 00 - 1
SECTION 09 91 00
PAINTING
GENERAL
1.1 SUMMARY
A. Provide painting as shown on the Finish Schedule in the Drawings and specified herein.
The type of material to be used and the number of coats to be applied are listed in the "Painting Schedule" in Part 3.00 of this Section of these Specifications. The term "paint", as used herein, included enamels, epoxies, paints, sealers, fillers, emulsions, and other coatings, whether used as prime, intermediate, or finish coats.
1.2 GENERAL REQUIREMENTS
A. This Section shall be performed in accordance with the General Conditions, Supplementary Conditions and all Sections in Division 1 of these Specifications. These documents must be read with the other Contract Documents and Sections as a whole to complete the intent of the contract.
1.3 SUBMITTALS
A. Make submittals to the Owner’s Representative in accordance with the provisions of Section 01 33 23 of these specifications.
1.4 INDOOR AIR POLLUTANT CONTORL REQUIREMENTS
A. VOC Limits
1. Architectural paints and coatings shall comply with VOC limits in Table 1 of the ARB Architectural Coatings Suggested Control Measure, as shown in Table 5.504.4.3 of the 2022 California Green Building Standards Code, unless more stringent local limits apply.
2. The VOC content limit for coatings that do not meet the definitions for the specialty coatings categories listed in Table 5.504.4.3 shall be determined by classifying the coating as a Flat, Nonflat or Nonflat-High Gloss coating, based on its gloss, as defined in Subsections 4.21, 4.36 and 4.37 of the 2007 California Air Resources Board, Suggested Control Measure, and the corresponding Flat, Nonflat or Nonflat-High Gloss VOC limit in Table 5.504.4.3 shall apply.
B. Aerosol Paints and Coatings
1. Aerosol paints and coatings shall meet the PWMIR Limits for ROC in Section 94522(a)(3) and other requirements, including prohibitions on use of certain toxic compounds and ozone depleting substances, in Sections 94522(c)(2) and (d)(2) of California Code of Regulations, Title 17, commencing with Section 94520; and in areas under the jurisdiction of the Bay Area Air Quality Management District additionally comply with the percent VOC by weight of product limits of Regulation 8 Rule 49.
1.5 PROJECT CONDITIONS
A. The General Contractor is responsible to ensure all materials used in this Section meet current California V.O.C. (volatile organic compounds/chemicals) Regulations. The Owner’s Representative shall be immediately notified of all V.O.C. conflicts. Work shall not proceed until conflicts are resolved.
1.6 EXTRA STOCK
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
PAINTING
09 10 00 - 2
A. Upon completion of this portion of the Work, deliver to the Owner an extra stock of one gallon of each color and gloss used in each coating material used, with all such extra stock tightly sealed in clearly labeled containers.
PRODUCTS
PAINT MATERIALS
A. Manufacturer
1. All paint materials selected for coating systems for each type of surface shall be the product of a single manufacturer.
2. Paint materials listed herein, unless otherwise designated in the "Painting Schedule", are the product of Dunn Edwards and require no further approval as to manufacturer or catalog number.
3. Equivalent products of other major paint manufacturers may be used subject to approval by the Owner’s Representative of the materials list and manufacturers' recommendations required to be submitted under Article 1.03 above. Equivalent product manufacturers must provide a manufacturers product reference guide demonstrating the equivalence of the product substituted to the one specified.
B. Compatibility
1. All paint materials and equipment shall be compatible in use; finish coats shall be compatible with prime coats; prime coats shall be compatible with the surface to be coated; all tools and equipment shall be compatible with the coating to be applied.
2. Thinners, when used, shall be only those thinners recommended for that purpose by the manufacturer of the material to be thinned.
C. Colors and glosses
1. All colors and glosses shall be indicated on the Painting Schedule and Finishes Schedule.
EXECUTION
3.1 PREPARATION OF SURFACES, GENERAL
A. Prior to all surface preparation and painting operations, completely mask, remove or otherwise adequately protect all hardware, accessories, machined surfaces, plates, lighting fixtures, and similar items in contact with painted surfaces but not scheduled to receive paint.
B. Spot prime all exposed nails and other metals which are to be painted with emulsion paints, using a primer recommended by the manufacturer of the coating system.
C. Before applying paint or other surface treatment, thoroughly clean all surfaces involved.
Schedule all cleaning and painting so that dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces.
3.2 PREPARATION OF WOOD SURFACE
A. Clean all wood surfaces until they are free from dirt, and all other foreign substance.
B. Unless specifically noted to be left rough, smooth all finished wood surfaces exposed to view, using the proper sandpaper. Where so required, use varying degrees of coarseness in sandpaper to produce uniformly smooth and unmarred wood surfaces.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
PAINTING
09 10 00 - 3
C. Knots
1. On small, dry, seasoned knots, thoroughly scrape and clean the surface and apply one coat of good quality knot-sealer before application of the priming coat.
2. On large, open, unseasoned knots, scrape off all pitch and thoroughly clean the area, followed by an application of one coat of good quality knot-sealer.
3. Remove and treat all pitch surfaces as required for large knots.
3.3 PREPARATION OF METAL SURFACES
A. Galvanized metal
1. Clean all surfaces thoroughly with solvent until they are completely free from dirt, soil, and grease.
2. Thoroughly treat the cleaned surface with phosphoric acid etch.
3. Remove all excess etching solution and allow to dry completely before application of paint.
B. Other metals
1. Thoroughly clean all surfaces until they are completely free from dirt, oil, grease and old paint.
2. Allow to dry thoroughly before application of paint.
3.4 PREPARATION OF MASONRY / CONCRETE SURFACES
A. Clean all masonry / concrete surfaces until they are free from dirt and all other foreign substances.
B. At existing exterior masonry / concrete to be sealed, water blast surfaces until they are free from dirt and all other foreign surfaces.
3.5 PAINT APPLICATION
A. General
1. Paint all surfaces, except glass, flat concrete, and similar items, not prefinished and not called out as unfinished.
2. Paint all grilles and other prefinished items where the factory prefinish is not in accordance with the Painting Schedule and color selection or where a prefinished item is not the same color as the adjacent surface. Paint to match adjacent surface.
B. Drying
1. Allow sufficient drying time between coats.
2. Modify the period as recommended by the material manufacturer to suit adverse weather conditions.
C. Environmental conditions
1. Comply with the manufacturer's recommendations as to environmental conditions under which the coating systems may be applied.
2. Do not apply paint in areas where dust is being generated.
D. Defects
1. Sand and dust between coats to remove all defects visible to the unaided eye from a distance of five feet.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
PAINTING
09 10 00 - 4
E. Color of undercoats
1. Slightly vary the color of succeeding coats.
3.6 INSPECTION
A. Do not apply additional coats until completed coat has been inspected and approved by the Owner’s Representative.
B. Only inspected and approved coats of paint will be considered in determining the number of coats applied.
3.7 RE-INSTALLATIN OF REMOVED ITEMS
A. Following completion of painting in each space, promptly reinstall all items removed for painting, using only workmen skilled in the particular trade.
3.8 CLEANING UP
A. During progress of the Work, do not allow the accumulation of empty containers or other excess items except in areas specifically set aside for that purpose. Prevent accidental spilling of paint materials and, in event of such spill, immediately remove all spilled material and the waste or other equipment used to clean up the spill, and wash the surfaces to their original undamaged condition, all at no additional cost to the Owner.
B. Upon completion of this portion of the Work visually inspect all surfaces and remove all paint and traces of paint from surfaces not scheduled to be painted.
3.9 PAINTING SCHEDULE
Apply the following finishes to the areas designated:
Type 1: Interior Metal (Ferrous – Semi-Gloss)
First Coat: DE Enduraprime ENPR00 Metal Primer
Second Coat: DE Endura-Coat ENCT50 DTM High Performance S/G Finish Third Coat: DE Endura-Coat ENCT50 DTM High Performance S/G Finish Type 2: Interior Drywall (Semi-Gloss)
First Coat: DE Vinylastic Select VNSL00 Zero VOC Wall Sealer Second Coat: DE Spartawall SWLL50 Interior Zero VOC Semi-Gloss Finish Third Coat: DE Spartawall SWLL50 Interior Zero VOC Semi-Gloss Finish Type 3: Interior CMU (Eggshell Sheen)
First Coat: DE Blocfil Premium SBPR00 Acrylic Block Filler Second Coat: DE Spartawall SSLL30 Zero VOC Eggshell Finish Third Coat: DE Spartawall SSLL30 Zero VOC Eggshell Finish PREVIOUSLY PAINTED SURFACES:
Spot prime bare or patched areas or prime entire surface.
First Coat: DE Ultra-Grip UGSL00 Acrylic Primer
Second Coat: DE Enduralastic 10 EDLX10 100% Acrylic Elastomeric Coating Third Coat: DE Enduralastic 10 EDLX10 100% Acrylic Elastomeric Coating END OF SECTION 09 91 00
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
SIGNAGE
10 14 00 - 1
SECTION 10 14 00
SIGNAGE
GENERAL
1.1 SUMMARY
A. Provide and install all signage as shown on the Drawings and as specified herein.
1.2 GENERAL REQUIREMENTS
A. This Section shall be performed in accordance with the General Conditions, Supplementary Conditions and all Sections in Division 1 of these Specifications. These documents must be read with the other Contract Documents and Sections as a whole to complete the intent of the contract.
1.3 SUBMITTALS
A. Make submittals to the Owner’s Representative in accordance with the provisions of Section 013323 of these specifications.
1.4 REGULATORY REQUIREMENTS
A. Comply with applicable provisions in the U.S. Architectural & Transportation Barriers Compliance Board's ADA-ABA Accessibility Guidelines and the State of California Building Code (CBC).
1.5 ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES
A. Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
PRODUCTS
MATERIALS
A. Acrylic Sheet: ASTM D 4802, Category A-1 (cell-cast sheet), Type UVA (UV absorbing).
B. Plastic Laminate: High-pressure laminate engraving stock with face and core in contrasting colors.
C. Applied Vinyl: Die-cut characters from vinyl film of nominal thickness of 3 mils (0.076 mm) with pressure-sensitive adhesive backing, suitable for exterior applications.
SIGNS
1. .
B. Interior Panel Signs] [Matte-finished opaque acrylic with adhesively applied vinyl film copy] with [square-cut] [beveled] edges and [square] [rounded] corners.
1. Finishes and Colors: Blue background panel to match existing
2. Tactile Characters: Characters and Grade 2 Braille raised 1/32 inch (0.8 mm) above surface with white contrasting color to match existing.
3. Provide signs for all rooms as indicated on the Drawings. a. Restroom Identification Signs
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
SIGNAGE
10 14 00 - 2
(1) Colored plexiglas with white contrasting lettering meeting State of California standards. Color to match existing as approved by Owner’s Representative.
Braille to meet State of California Regulations for braille size, height and spacing.
b. Room Occupancy Signs
(1) Colored plexiglas with white contrasting lettering meeting State of California standards. Color to be Blue to match existing as approved by Owner’s Representative. Sign size and wording to be approved by local Fire Department prior to fabrication
EXECUTION
3.1 INSTALLATION
A. Locate signs where indicated on the Drawings or directed by Owner’s Representative.
Install signs level, plumb, and at heights indicated, with sign surfaces free from distortion and other defects in appearance.
B. Wall-Mounted Signs
1. Two-Face Tape: Mount signs to smooth, nonporous surfaces, other than vinyl.
2. Silicone-Adhesive Mounting: Attach signs to irregular, porous, or vinyl-covered surfaces.
END OF SECTION 10 14 00
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TOILET COMPARTMENTS
10 21 00 - 1
SECTION 10 21 00
HDPE TOILET COMPARTMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Solid plastic toilet compartments including the following: (Hiny Hiders)
1. Floor-to-ceiling toilet compartments.
1.2 REFERENCES
A. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
B. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials.
C. National Fire Protection Association (NFPA) 286 - Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire Growth.
1.3 SUBMITTALS
A. Submit under provisions of Section 01 30 00 - Administrative Requirements.
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Shop Drawings: Provide layout drawings and installation details with location and type of hardware required.
D. Verification Samples: For each finish product specified, two samples representing actual product, color, and patterns.
E. Product Certification & Sustainable Design Submittals:
1. Recycled Content: Certify percentages of post-consumer and pre-consumer recycled content.
2. Regional Materials: Certify distance between manufacturer and Project.
3. NFPA 286 Testing & Certification: Supply full and complete 3rd party testing results to certify NFPA 286 compliance.
1.4 QUALITY ASSURANCE
A. Manufacturer Qualifications: A company regularly engaged in manufacture of products specified in this section, and whose products have been in satisfactory use under similar service conditions for not less than 5 years.
B. Installer Qualifications: A company regularly engaged in installation of products specified in this Section, with a minimum of 5 years experience.
C. Materials: Doors, panels and pilasters, constructed from high density polyethylene (HDPE) resins. Partitions to be fabricated from polymer resins compounded under high pressure, forming a single component which is waterproof, nonabsorbent and has a self-lubricating surface that resists marks from pens, pencils, markers and other writing instruments. Cover all plastic components with a protective plastic masking.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TOILET COMPARTMENTS
10 21 00 - 2
D. Performance Requirements:
1. Fire Resistance: Partition materials shall comply with the following requirements, when tested in accordance with ASTM E 84, Class B:
a. Tested to Meet ASTM E84, Class B flame spread/smoke developed rating.
2. Material Fire Ratings:
a. National Fire Protection Association (NFPA) 286: Pass. b. International Code Council (ICC): Class B.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
1.6 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
1.7 WARRANTY
A. Manufacturer guarantees its plastic against breakage, corrosion, and delamination under normal conditions for 25 years from the date of receipt by the customer. If materials are found to be defective during that period for reasons listed above, the materials will be replaced free of charge. Labor not included in warranty.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer: Scranton Products, which is located at: 801 E. Corey St.; Scranton, PA 18505; Toll Free Tel: 800-445-5148; Fax: 855-376-6161; Email:request info ([email protected]); Web:http://www.scrantonproducts.com
1. Fabricator: Santana Toilet Partitions.
2. Fabricator: Comtec Toilet Partitions.
3. Fabricator: Capitol Toilet Partitions.
B. Substitutions: Not permitted.
2.2 MATERIAL
A. Plastic Panels: High density polyethylene (HDPE) suitable for exposed applications, waterproof, non-absorbent, and graffiti-resistant textured surface.
1. Recycled Content; Post Industrial: 25 percent.
B. Zinc Aluminum Magnesium and Copper Alloy (Zamac): ASTM B 86.
C. Stainless Steel Castings: ASTM A167, Type 304.
D. Aluminum: ASTM 6463-T5 alloy.
2.3 SOLID PLASTIC TOILET COMPARTMENTS
A. Basis of Design: Hiny Hiders Toilet Partitions as manufactured by and supplied by Scranton Products.
1. Style: Floor-to-ceiling toilet compartments.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TOILET COMPARTMENTS
10 21 00 - 3
B. Doors, Panels, and Pilasters: 1 inch (25 mm) thick with all edges rounded to a radius. Mount doors and dividing panels based on height of specified system.
1. Door and Panel Height: 72 inches (1829 mm).
2. Panel Edge: Shiplap.
C. Panel Color: As selected by Owner’s Representative.
D. Pilaster Shoes: 3 inches (76 mm) high one-piece molded HDPE. Secured to pilasters with a stainless steel tamper resistant Torx head sex bolt.
1. Pilaster Plastic Shoe Color: Silver (Matches Stainless/Aluminum Hardware).
E. Wall Brackets:
1. Aluminum Brackets: Heavy-duty aluminum 6463-T5 alloy.
2. Brackets are fastened to pilasters with stainless steel tamper resistant Torx head screws and fastened to the panels with stainless steel tamper resistant Torx head hex bolts.
3. Bracket Type: Continuous 71 inches (1804 mm) aluminum.
F. Door Hardware:
1. Continuous Aluminum Hinge:
a. Length: 71 inches (1803 mm).
b. Ship Lapped
2. Latch Mechanism: Occupancy Indicator Latch and Housing:
a. Occupancy indicators: Green for occupied and red not occupied.
3. Doors supplied with one coat hook/bumper and door pull, clear anodized aluminum or stainless steel.
4. Equip outswing handicapped doors with second door pull and door stop.
2.4 SOLID PLASTIC PRIVACY SCREENS
A. Provide plastic privacy screens in urinal and entry toilet room applications as indicated or scheduled.
B. Panels, and pilasters, if required, 1 inch (25 mm) thick with edges rounded to a radius.
Screens to be mounted at 14 inches (356 mm) above the finished floor. Color as selected by Owner’s Representative from manufacturer's full line of current colors.
1. Aluminum heat sink fastened to bottom edges.
2. Recycled Content: Minimum 25 percent.
C. Screen Type: Pilaster supported.
1. Configuration: Floor to ceiling pilaster supported screen.
2. Urinal Screens: 24 inches (610 mm) wide by 55 inches (1397 mm) high.
3. Floor to Ceiling Supported Pilaster: A stainless steel angle to be used to attach pilasters to floor and ceiling. Attach angles to pilasters with 3/4 inch (19 mm) stainless steel tamper resistant Torx head screws. Pilaster sleeve height to be 4 inches (102 mm) high.
4. Pilaster Shoes: One-piece molded HDPE secured to the pilaster with a stainless steel tamper resistant Torx head sex bolt.
a. Pilaster Shoes Color: Silver; matches clear anodized hardware.
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TOILET COMPARTMENTS
10 21 00 - 4
B. If substrate preparation is the responsibility of another installer, notify Owner’s Representative of unsatisfactory preparation before proceeding.
3.2 PREPARATION
A. Clean surfaces thoroughly prior to installation.
B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
C. Examine areas to receive toilet partitions, screens, and shower compartments for correct height and spacing of anchorage/blocking and plumbing fixtures that affect installation of partitions. Report discrepancies to the Owner’s Representative.
3.3 INSTALLATION
A. Install in accordance with manufacturer's instructions.
B. Install partitions rigid, straight, plumb, and level manor, with plastic laid out as shown on shop drawings.
C. Clearance at vertical edges of doors shall be uniform top to bottom and shall not exceed 3/8 inch (9.5 mm).
D. No evidence of cutting, drilling, and/or patching shall be visible on the finished work.
E. Finished surfaces shall be cleaned after installation and be left free of imperfections.
3.4 PROTECTION
A. Protect installed products until completion of project.
B. Touch-up, repair or replace damaged products before Substantial Completion.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 1
SECTION 13 11 00
SWIMMING POOL GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 WORK INCLUDED
A. The scope of the work included under this Section of the Specifications shall include swimming pool(s) as illustrated on the Drawings and specified herein. The General and Supplementary Conditions of the Specifications shall form a part and be included under this Section of the Specifications. The Swimming Pool Subcontractor shall provide all supervision, labor, material, equipment, machinery, plant and any and all other items necessary to complete the work. ALL OF THE WORK IN SECTIONS 13 11 00 - 13 11 09 IS TO BE THE
RESPONSIBILITY OF ONE EXPERIENCED SWIMMING POOL SUBCONTRACTOR
PRIMARILY ENGAGED IN THE CONSTRUCTION OF COMMERCIAL PUBLIC-USE SWIMMING POOLS. A SWIMMING POOL SUBCONTRACTOR SHALL BE CONSIDERED
PRIMARILY ENGAGED AS REQUIRED HEREIN IF THE SUBCONTRACTOR DERIVED 50% OF ITS ANNUAL REVENUE FROM NEWLY CONSTRUCTED PUBLIC-USE SWIMMING POOL CONSTRUCTION FOR EACH OF THE LAST FIVE YEARS. THE
SUBCONTRACTOR MUST HAVE ALSO, IN THE LAST FIVE YEARS CONSTRUCTED AT LEAST FIVE (5) NEWLY CONSTRUCTED, COMMERCIALLY DESIGNED MUNICIPAL AND
PUBLIC-USE SWIMMING POOLS, EACH OF WHICH SHALL HAVE INCORPORATED A MINIMUM SIZE OF 6,000 SQUARE FEET OF WATER SURFACE AREA WITH A CONCRETE AND CERAMIC TILE PERIMETER OVERFLOW GUTTER AND SELFMODULATING BALANCE TANK. The Swimming Pool Subcontractor shall furnish and install the swimming pool structures, finishes, cantilever forming, swimming pool mechanical and electrical systems, and all accessories necessary for a complete, functional swimming pool system, as herein described. Work shall include start-up, instruction of Owner’s personnel, asbuilt drawings and warranties as required.
1.02 CODES, RULES, PERMITS, FEES
A. The swimming pools shall be constructed in strict accordance with the applicable provisions set forth by authorities having jurisdiction over swimming pool construction and operation in the State of California.
B. The Swimming Pool Subcontractor shall give all necessary notices, obtain all permits, and pay all government sales taxes, fees, and other costs in connection with their work; file all necessary plans, prepare all documents and obtain all necessary approvals of governmental departments having jurisdiction; obtain all required certificates of inspection for their work and deliver same to the Designated Representative before request for acceptance and final payment for the work.
C. The Swimming Pool Subcontractor shall include in the work any labor, materials, services, apparatus, or drawings in order to comply with all applicable laws, ordinances, rules and regulations, whether or not shown on Drawings and/or specified.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 2
D. The Contractor shall submit all required documents and materials to all Governmental Departments having jurisdiction for any deferred approval items or substituted materials or products to obtain final approval to installation.
1.03 DESCRIPTION OF WORK
A. Furnish and perform supervision, coordination, all layout, formwork, excavation, hand trim, disposing off-site of all unused material or debris to complete the swimming pool excavation to the dimensions shown on the plans.
B. Furnish and install complete swimming pool structures, including reinforcing steel and cast-inplace or pneumatically placed concrete walls and floors.
C. Furnish and install swimming pool finishes, including ceramic tile and marble plaster or other waterproof finishes.
D. Furnish and install complete swimming pool mechanical system(s), including, but not limited to, circulation systems, filtration systems, pool water heating systems, water chemistry control systems, domestic water fill line systems, booster pump and special effects systems, and all pumps, piping, valves, and connections between system(s) and swimming pool(s).
E. Furnish and install complete swimming pool electrical system(s) from P.O.C. in Mechanical Room, including, but not limited to, underwater lighting systems, water level control systems, timing systems, scoreboards, special effects systems, control circuitry, motor starters, time clocks, bonding, and all conduits, conductors, contactors, and switches between the system(s) and swimming pool(s).
F. Furnish and install all swimming pool cantilever forming, deck equipment and required anchors and inserts for the specified equipment as required by code, shown on the Drawings and specified herein.
G. After the initial filling of the swimming pool system(s), should any repairs, continuing work, or other Subcontractor responsibility require drainage or partial drainage of the swimming pool systems, the Swimming Pool Subcontractor shall be responsible for any subsequent refilling and shall complete the project with the swimming pool system(s) full of water, water in chemical balance, complete in every way, and in full operation.
H. For Competition Pools: The Contractor shall retain an independent licensed surveyor to provide proof of compliance for required pool lengths as follows:
1. 25 Yards: (Allows for touch pads at one end) 75’- 5/16” minimum, 75’-1 3/16” maximum.
2. 25 Meter: (Allows for touch pads at one end) 82’-9/16” minimum, 82’-13/16” maximum.
3. 50 Meter: (Allows for touch pads at both ends)164’-1 1/8” minimum, 164’-1 11/16” maximum.
Tolerance against length shall extend in a vertical plane 0.3M (12”) above and 0.8M. (2’-7 ½”) below the surface of the water at all points of both end walls typ. of all courses.
The independent licensed surveyor shall fill out, notarize and fill official certifications forms with USA Swimming.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 3
I. Contractor shall retain a licensed engineer to certify the field built main drain systems as VGB Compliant.
1.04 ASSIGNED RESPONSIBILITIES AND RELATED WORK
A. It is the intent of this section of the Specifications to clarify Work responsibilities of the trades directly and indirectly involved in construction of the pool systems. All labor, equipment, materials and supplies furnished by the Swimming Pool Subcontractor and other Subcontractors per the contractual agreement with the General Contractor and Owner and shall be as directed by the Owner through their Designated Representative.
B. THE SWIMMING POOL SUBCONTRACTOR SHALL NOT SUBCONTRACT ANY PORTION
OF THE SWIMMING POOL CONSTRUCTION OR SWIMMING POOL EQUIPMENT
INSTALLATION TO ANYONE OTHER THAN A SUBCONTRACTOR THAT SATISFIES THE REQUIREMENTS OF SECTION 13 11 00
C. References to “swimming pool systems” shall include the swimming pools, equipment, and accessories.
D. The Owner will provide one complete water filling of the swimming pool(s), but will not assume any responsibility for the swimming pool system(s) until they have been proved fully operational, complete in every way and accepted by the Designated Representative.
1.05 RESPONSIBILITIES OF THE CONTRACTOR
A. The Contractor shall grade the swimming pool site(s), establish benchmarks, cut and fill as necessary to provide as level an area as possible at swimming pool deck elevation before swimming pool layout.
B. The Contractor shall be responsible for horizontal dimensions and grade elevations accurately from established lines and benchmarks (as indicated on the Drawings) and be responsible for those grades.
C. The Contractor shall provide adequate temporary light, electric power, heat and ventilation per Federal and State OSHA requirements to construct the swimming pool system(s).
D. The Contractor shall not permit any heavy equipment activity over any area or within five (5) feet of any area under which swimming pool piping is buried. There shall be no exceptions to this requirement.
E. The Contractor shall keep the swimming pool excavation(s) and swimming pool structure(s) free of construction residue and waste materials of their workmen or Subcontractors, removing said material from the swimming pools as required.
F. The Contractor shall protect the swimming pool(s) from damage caused by their construction equipment and /or workmen and Subcontractors.
G. The Contractor shall provide a representative at time of swimming pool start-up to coordinate all trades related to swimming pool system(s).
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 4
1.06 RESPONSIBILITIES OF THE MECHANICAL SUBCONTRACTOR
A. The Mechanical Subcontractor shall be licensed in the State of California and provide written notifications to Swimming Pool Subcontractor and contractor when necessary to excavate and backfill within the swimming pool construction site.
B. The Mechanical Subcontractor shall not utilize any swimming pool piping trench for installation of any sanitary sewer, storm sewer, domestic water, hot water, chilled water or natural gas line.
C. The Mechanical Subcontractor shall furnish and install all sanitary sewer piping, including vent stacks (if necessary), for backwash pits, floor drains and floor sinks as required by code, shown on Drawings, and herein specified.
D. The Mechanical Subcontractor shall furnish and install all storm sewer piping and site drainage systems as required by code, shown on the Drawings, and herein specified.
E. The Mechanical Subcontractor shall provide a minimum 75 psi water supply for swimming pool construction work within fifty (50) feet of the swimming pool construction site(s).
F. The Mechanical Subcontractor shall furnish and install reduced pressure backflow protected domestic water lines to P.O.C. within swimming pool Mechanical Room as required by code, shown on the Drawings, and herein specified.
G. The Mechanical Subcontractor shall furnish and install natural gas piping, pressure regulation and valving to P.O.C. within swimming pool Mechanical Room as required by code, shown on the drawings, and herein specified.
H. The Mechanical Subcontractor shall furnish and install all ductwork, louvers, and all HVAC equipment within swimming pool Mechanical Room as required by code, shown on the Drawings, and herein specified.
I. The Mechanical Subcontractor shall provide a representative at time of swimming pool start-up to coordinate work related to swimming pool system(s).
1.07 RESPONSIBILITIES OF THE ELECTRICAL SUBCONTRACTOR
A. The Electrical Subcontractor shall be licensed in the State of California and shall furnish and install electrical service to swimming pool Mechanical Room sized to accommodate all necessary swimming pool equipment as shown on the Drawings and herein specified.
B. The Electrical Subcontractor shall furnish any temporary power needed by the Swimming Pool Subcontractor within fifty (50) feet of the swimming pool construction site(s).
C. The Electrical Subcontractor shall furnish and install all conduits, conductors, starters/disconnects, panels, circuits, switches and equipment as required for lighting, ventilation and HVAC equipment within swimming pool Mechanical Room as required by code, shown on the Drawings, and herein specified.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 5
D. The Electrical Subcontractor shall furnish and install all conduits, conductors, panels, circuits, switches and equipment for area lighting as required by code, shown on the Drawings, and herein specified.
E. All equipment, material and installation shall be as required under Division 16 of the Specifications and shall conform to NEC Article 680 (latest revision), State and Local Codes, and as may be required by all authorities having jurisdiction over swimming pool construction within the State of California.
F. The Electrical Subcontractor shall provide a representative at time of swimming pool start-up to coordinate work related to swimming pool system(s).
1.08 INTENT
A. It is the intention of these specifications and Drawings to call for finished work, tested and ready for operation. Wherever the word “provide” is used, it shall mean “furnish and install complete and ready for use.”
B. Minor details not usually shown or specified, but necessary for proper installation and operation, shall be included in the work, the same as if herein specified or shown.
1.09 SCHEDULE OF VALUES
A. Provide a Schedule of Values for all work specified in each of the technical specifications listed in the table below, regardless of whether the work is performed by the swimming pool contractor or others. Values listed shall be fully burdened, with contractor general conditions, overhead, profit and bonds included. Payments for swimming pool work completed shall not be approved until Schedule of Values has been submitted to and approved by Architect.
SWIMMING POOL SCHEDULE OF VALUES
No. Section # Description Value
1. 131102 Swimming Pool Concrete
2. 131104 Swimming Pool Ceramic Tile
3. 131105 Swimming Pool Plaster
4. 131106 Swimming Pool Equipment
5. 131107 Swimming Pool Mechanical
6. 131108 Swimming Pool Electrical
1.10 SUBMITTAL PROCEDURES
A. General: Electronic copies of CAD Drawings of the Contract Drawings will not be provided by Architect for Subcontractor's use in preparing submittals.
B. Coordination: Coordinate preparation and processing submittals with performance construction activities.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 6
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
C. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for schedules performance of related construction activities.
D. Processing Time: Allow enough time for submittal review, including time for re-submittals as follows. Time for review shall commence on Architect's receipt of submittal.
1. Initial Review: Allow fifteen (15) days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Architect will advise Contract when a submittal being processed must be delayed for coordination.
2. Concurrent Review: Where concurrent review of submittals by Architect's consultants, Owner, or other parties is required, allow twenty-one (21) days for initial review of each submittal.
3. Direct Transmittal to Consultant: Where the Contract Documents indicate that submittals may be transmitted directly to Architect's consultants, provide duplicate copy of transmittal to Architect. Submittal will be returned to Architect before being returned to Subcontractor.
4. If intermediate submittal is necessary, process it in same manner as initial submittal.
5. Allow fifteen (15) days for processing each submittal.
6. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
E. Identification: Place a title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on title block.
2. Provide a space on title block to record Subcontractor's review and approval markings and action take by Architect.
3. Include the following information on title block for processing and recording action taken:
(See Attached Sample)
a. Project name.
b. Date.
c. Name and address of Subcontractor.
d. Name of Subcontractor.
e. Name of Supplier.
f. Name of Manufacturer.
g. Unique identifier, including revision number.
h. Number and title of appropriate Specification Section. i. Drawing number and detail references, as appropriate. j. Other necessary identification.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 7
SUBMITTAL FOR: SUBMITTAL TO: SUBCONTRACTOR:
Item Number:
Section Number:
Section Description:
Subcontractor:
Supplier:
Manufacturer:
Product Code:
Quantity:
Subcontractor Certification: Contractor's Submittal Stamp:
It is hereby certified that the equipment or
material designated in this submittal is
proposed to be incorporated in the above
named project and is in compliance with the
contract drawings and / or specifications and is
submitted for approval.
Certified by:
Date:
Job
Superintendent:
Revisions:
Architect's Review Stamp and Comments
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 8
F. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract documents on submittal.
G. On all catalogue or cut sheets identify which model or type is being submitted.
H. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Product data and shop drawings shall be packaged within a three-ring binder and colored samples shall be packaged on a heavy cardboard. Transmit each submittal using a transmittal form.
1. On an attached separate sheet, prepared on Subcontractor's letterhead, record relevant information, request for data, revisions other than those requested by Architect on previous submittals and deviations from requirements of the Contract documents, including minor variations and limitations. Include the same label information as the related submittal.
2. Include Subcontractor's certification stating that information submitted complies with requires of the Contract Documents.
3. Transmittal Form: Provide locations on form for the following information:
a. Project name.
b. Date.
c. Destination (To:).
d. Source (From:).
e. Names of Subcontractor, manufacturer, and supplier.
f. Category and type of submittal.
g. Submittal purpose and description.
h. Remarks.
I. Distribution: Furnish copies of final submittals to manufacturers, Subcontractors, suppliers, fabricators, installers, authorities having jurisdiction and others as necessary for performance of construction activities. Show distribution on transmittal forms.
J. Use for Construction: Use only final submittals with mark indicating action taken by Architect in connection with construction.
1.11 SUBSTITUTIONS
A. To obtain approval to use unspecified products, bidders shall submit requests for substitution at least ten (10) days prior to bid date. Requests shall only be considered if they clearly describe the product for which approval is asked, including all data necessary to demonstrate acceptability. All unspecified products and equipment will be considered on an “or equal” basis at the discretion of the Designated Representative. Requests for substitution received after the specified deadline will not be considered. Where a conflict exists between the requirements of the General Conditions / Special Conditions / Division 1 concerning substitutions and the requirements of this Article, this Article (Section 13 11 00, Article 1.10) shall govern.
B. Where the Swimming Pool Subcontractor proposes to use an item of equipment other than that specified or detailed on the Drawings which requires any redesign of the structure, For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 9
partitions, foundations, piping, wiring, or any other part of the architectural, mechanical, or electrical layout, all such redesign and all new drawings (stamped by California Licensed Engineer) and detailing required shall be prepared by the Swimming Pool Subcontractor, at their own expense, submitted for review and approval by the Designated Representative prior to bid.
C. Where such approved deviation requires a different quantity and arrangement of piping, supports and anchors, wiring, conduit, and equipment from that specified or indicated on the Drawings, the Swimming Pool Subcontractor shall furnish and install any such piping, structural supports, controllers, motors, starters, electrical wiring and conduit, and any other additional equipment required by the system, at no additional cost to the Owner.
1.12 SURVEYS AND MEASUREMENTS
A. The Swimming Pool Subcontractor shall base all measurements, both horizontal and vertical, from benchmarks established by the Contractor. All work shall agree with these established lines and levels. The mechanical Drawings do not give exact details as to elevations of piping, exact locations, etc. and do not show all offsets, control lines, pilot lines and other installation details. Verify all measurements at site and check the correctness of same as related to the work.
1.13 DRAWINGS
A. Drawings are diagrammatic and indicate the general arrangement of the systems and work included in the Subcontractor. Drawings are not to be scaled. The architectural drawings and details shall be examined for exact dimensions. Where they are not definitely shown, this information shall be obtained from the Designated Representative.
1.14 SWIMMING POOL SUBSUBCONTRACTOR
A. The swimming pool construction work as herein described and specified in Division 13 of the Project Manual shall be the complete responsibility of a qualified and specifically licensed (C53 license classification within the State of California) Swimming Pool Subcontractor with extensive experience in commercial public use swimming pool installations.
B. The Contractor shall require the Swimming Pool Subcontractor to furnish to the Contractor performance and payment bonds in the amount of 100% of the Swimming Pool Subcontractor’s bid written by a surety Company properly registered in the State of California and listed by the U.S. Treasury. The expense of the bond(s) is to be borne by the Subcontractor. The Contractor shall clearly specify the amount and requirements of the bond(s) in the Contractor’s written or published request for subbids. The Contractor’s written or published request for subbids shall also specify that the bond(s) expense is to be borne by the Subcontractor.
C. Subcontractor certifies that it meets the qualifications and experience requirements established in Swimming Pool General Requirements, Section 13 11 00, as follows:
1. Subcontractor has derived 50% of its annual revenue from public-use swimming pool construction for each of the last five (5) years.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 10
2. Subcontractor has, in the last five (5) years, constructed at least five (5) commercially designed municipal and public-use swimming pools, each of which have incorporated a minimum size of 6,000 square feet of water surface area with a concrete and ceramic tile perimeter overflow gutter and self-modulating balance tank.
3. The following list of projects meet the requirements of section (b) above and the contact as reference by the Contractor, the Awarding Authority of their agent or designee. a. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
b. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
c. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
d. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
e. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
D. Swimming Pool Deck Subcontractor other than the swimming pool Subcontractor certifies that it meets the qualifications and experience requirements established in Swimming Pool General Requirements, Section 13 11 00, as follows:
1. Subcontract has, in the last five (5) years, constructed at least five (5) commercially designed cantilevered pool decks over perimeter gutters, each of which have incorporated a minimum size of 6,000 square feet of water surface area of the swimming pool.
2. The following list of projects meet the requirements of section (b) above and the contact as reference by the Contractor, the Awarding Authority of their agent or designee.
SWIMMING POOL DECK SUBCONTRACTOR
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 11
a. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
b. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
c. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
d. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
e. Owner:
Scope of Project:
Contact Person:
Phone Number:
Architect for Project:
1.15 OPERATING INSTRUCTIONS
A. The Swimming Pool Subcontractor shall determine from actual samples of pool water supplied by the Owner, the proper water management program necessary for maximum operating efficiency and comfort. The Swimming Pool Subcontractor shall provide the services of experienced personnel familiar with this type of pool system operation, in conformance with Section 13 11 05 of the Specifications.
1.16 MAINTENANCE MANUALS
A. The Swimming Pool Subcontractor shall provide six (6) bound sets for delivery to the Designated Representative of instructions for operating and maintaining all systems and equipment included in this Contract. Manufacturer’s advertising literature or catalog pictures will not be acceptable for operating and maintenance instructions.
B. Bound in ring binders shall be all parts lists, periodic maintenance instructions and troubleshooting guidelines for all pool equipment, including but not limited to filters, pumps, controllers, water chemistry control equipment, etc.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL GENERAL REQUIREMENTS
13 11 00 - 12
1.17 SECURE FROM THE OWNER
A. A complete Owner-furnished filling of the swimming pools.
B. The Owner’s assistance, as specified herein, from the time of start-up until final written acceptance of the swimming pool system(s).
C. Chemicals as required for swimming pool operation after Swimming Pool Subcontractor completes initial water chemistry balance and water treatment during the maintenance period described in Section 13 11 05 of the Specifications.
1.18 WARRANTY
A. The Swimming Pool Subcontractor shall warrant all swimming pool structures, finishes and systems against defects in material and workmanship for a period of one year after the date of acceptance by the Owner. Any repair or replacement required due to defective material or workmanship will be promptly corrected by the Swimming Pool Subcontractor.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 1
SECTION 13 11 02
SWIMMING POOL CONCRETE
PART 1 GENERAL
1.01 WORK INCLUDED
A. Forming for cast-in-place concrete and shotcrete associated with swimming pools.
B. Reinforcement for cast-in-place concrete and shotcrete associated with swimming pools.
C. Cast-in-place concrete for swimming pool structures. Do not use waterproofing admixture of any kind.
D. Provide labor, materials and equipment as required to install sealant for all pool deck expansion joints, or any other caulking, as indicated on the aquatic Drawings and herein specified.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years’ experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years’ experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Standards:
1. In addition to complying with the California Building Code (2022 edition), comply with all pertinent recommendations contained in “Guide to Formwork for Concrete" Publication ACI 347R-14 of the American Concrete Institute.
2. In addition to complying with California Building Code (2022 edition), comply with all pertinent recommendations contained in “Guide to Presenting Reinforcing Steel Design Details,” Publication ACI 315R-18 of the American Concrete Institute.
3. In addition to complying with all local codes and regulations, comply with all pertinent recommendations contained in American Society for Testing and materials (ASTM); ASTM C 920 “Standard Specification for Elastometric Joint Sealants.” C. Tolerances: Construct all swimming pool concrete straight, true, plumb and square within a tolerance horizontally and vertically of 1/8” in total distance.
1.03 SUBMITTAL AND SUBSTITUTIONS
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 2
A. Provide submittals in conformance with the requirements of Section 013300. Requests for substitution shall conform to requirements of Article 1.10.A of Section 131100.
B. Samples and Certificates, Concrete Reinforcement:
1. Provide all data and access required for testing as described in Section 01400 of the Specifications.
2. All material shall bear mill tags with heat number identification. Mill analysis and report shall be made available upon request.
3. Material not so labeled and identifiable may be required by the Owner to be tested by the testing laboratory selected by the Owner and at no additional cost to the Owner, in which case random samples will be taken for one series of tests from each 2-1/2 tons or fraction thereof of each size and kind of reinforcing steel.
4. Design mix from batch plant demonstrating previous use history and associated strengths at 28 days.
5. The Contractor shall submit a mix design stamped and signed by a licensed engineer for approval by the Owner’s Representative prior to any placement of concrete.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
D. Submit reinforcing shop drawings for pool walls, gutters, floors, dike walls and balance tank, etc. as shown on the construction drawing.
1.04 PRODUCT HANDLING
A. Delivery: Deliver materials to the Project Site in the manufacturer's original unopened containers with all labels intact and legible.
B. Storage: Store materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project Site.
C. Protection: Use all means necessary to protect the swimming pool concrete before, during, and after installation and to protect the installed Work specified in other Sections.
D. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner.
PART 2 PRODUCTS
2.01 CONCRETE FORMWORK
A. Form Materials:
1. Form Lumber: All form lumber in contact with exposed concrete shall be new except as allowed for reuse of forms in Part 3 of this Section, and all form lumber shall be one of the following, a combination thereof, or an equal approved in advance by the Owner’s Representative.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 3
a. "Plyform," Class I or II, bearing the label of the Douglas Fir Plywood Association; "Inner-Seal" Form as manufactured by Louisiana-Pacific, or approved equal. b. Douglas Fir-Larch, number two grade, seasoned, surfaced four sides.
2. Form Release Agent: Colorless, non-staining, free from oils; chemically reactive agent that shall not impair bonding of paint or other coatings intended for use.
B. Ties and Spreaders:
1. Type: All form ties shall be a type which do not leave an open hole through the concrete and which permits neat and solid patching at every hole.
2. Design: When forms are removed, all metal reinforcement shall be not less than two (2) inches from the finished concrete surface.
3. Wire Ties and Wood Spreaders: Do not use wire ties or wood spreaders.
C. Alternate Forming Systems: Alternate forming systems may be used subject to the advance approval of the Owner’s Representative.
2.02 CONCRETE REINFORCEMENT
A. Bars: Bars for reinforcement shall conform to “Specifications for Deformed Carbon-Steel Bars for Concrete Reinforcement,” ASTM A-615, Grade 60.
B. Wire Fabric: Wire fabric shall conform to “Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete”, ASTM A1064.
C. Tie Wire: Tie wire for reinforcement shall conform to “Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete”, ASTM A853 black annealed 16-gauge tie wire.
2.03 CAST-IN-PLACE CONCRETE
A. Concrete:
1. All concrete, unless otherwise specifically permitted by the Owner’s Representative, shall be transit-mixed in accordance with ASTM C94. Concrete for water retaining structures that do not receive a waterproofing finish such as ceramic tile or swimming pool plaster shall receive a topical waterproofing finish.
2. The control of concrete production shall be under the supervision of a recognized testing agency, selected by the Owner in accordance with Section 01 25 00 of the Specifications.
3. Quality: All concrete shall have the following minimum compressive strengths at twentyeight (28) days and shall be proportioned within the following limits a. 4,000 psi minimum compressive strength for cast-in-place swimming pool structures. b. 1” maximum size aggregate.
c. 6.0 minimum sacks of cement per cubic yard. *
d. Maximum water to cement ratio of 0.40 minimum-0.45 maximum.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 4
e. 4” maximum slump.
* For estimate only: to be determined by mix design.
4. Cement: All cement shall be Portland Cement conforming to ASTM C-150, Type II or V and shall be the product of one manufacturer.
5. Aggregates:
a. Shall conform to “Standard Specifications for Concrete Aggregates,” ASTM C33, except as modified herein.
b. Coarse Aggregate: Clean sound washed gravel or crushed rock. Crushing may constitute not more than 30% of the total coarse aggregate volume. Not more than 5% flat, thin, elongated or laminated material nor more than 1% deleterious material shall be present. 1" aggregate graded from 1/4” to 1”, fineness modulus 6.90 to 7.40. 1-1/2” graded from ½” to 1-1/2”, fineness modulus 7.80 to 8.20. c. Fine Aggregate: Washed natural sand of hard, strong particles and shall contain not more than 1% of deleterious material, fineness modulus 2.65 to 3.05. d. Aggregate must be certified, non-expansive from a “known” good source.
6. Water: ASTM C1602 Clean, fresh, free from acid, alkali, organic matter or other impurities liable to be detrimental to the concrete (potable).
7. Admixtures: Admixtures shall be used upon approval of the Owner's Representative. a. Air-entraining admixture: Conform to ASTM C260.
b. Water-reducing admixture: Conform to ASTM C494.
B. Construction Joints: Use keyform for slab pour joints. Either preformed galvanized or PVC construction joint forms of a standard manufacturer may be used. Install per manufacturer's recommendations and tool edges of slabs.
C. Waterstops: PVC bulb-type for use between concrete pours / lifts, conforming with ASTM D 570, D 624, and D 638. Provide in configuration(s) as recommended by manufacturer for specific application. Greenstreak, W.R. Meadows, or approved equal.
D. Curing Materials:
1. Liquid Membrane (covered slab): Chlorinated rubber membrane forming, curing-sealing compound conforming to ASTM C309.
2. Liquid Membrane (exposed slab): Clear methyl and butyl methacrylate non-staining, membrane forming, curing-sealing compound conforming to ASTM C309.
E. Cement Grout and Drypack:
1. Cement Grout: Mix 1 part by volume of Portland Cement, 1/2 part by volume of water and fine aggregate enough to make mixture flow under its' own weight.
2. Drypack: Mix 1 part by volume of Portland Cement, 1/2 part by volume of water and fine aggregate enough to make a stiff mix that will mold into a ball. Mix no more than can be used in 30 minutes.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 5
2.04 JOINT SEALANT MATERIALS
A. Caulking: Multipart, non-sag gun grade polyurethane based sealant meeting the requirements of ASTM C920-02, Type S or M, Mamemco International, Pecora, Sika Corp., Sonneborn Building Products, Tremco or approved equal. Self-leveling caulking materials are not allowed.
B. Primer: Non-staining type, recommended by sealant manufacturer to suit application.
C. Joint Cleaner: Non-corrosive and non-staining type, recommended by sealant manufacturer; compatible with joint forming materials.
D. Sealant Backer Rod: Provide compressible polyethylene or polyurethane backer rod as recommended by the sealant manufacturer.
E. Bond Breaker Tape: Provide polyethylene tape or other plastic tape as recommended by sealant manufacturer, to be applied to sealant-contact surfaces where bond to substrate or joint filler must be avoided for proper performance of sealant.
F. Sand: Cover the surface of the caulking with #30 silica sand.
2.05 OTHER MATERIALS
A. All other materials, not specifically described but required for proper completion of the work of this Section, shall be as selected by the Contractor subject to the advance review by the Owner’s Representative.
PART 3 EXECUTION
3.01 SURFACE CONDITIONS
A. Inspection:
1. Prior to all Work of this Section, carefully inspect the installed Work of other trades and verify that all such Work is complete to the point where this installation may properly commence.
2. Verify that all Work may be constructed in accordance with all applicable codes and regulations, the referenced standards, the original design, and in accordance with site specific Geotechnical Report.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Owner’s Representative.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.
3. Failure to notify the Owner’s Representative and give written notice of discrepancies shall constitute acceptance by the Contractor of existing conditions as fit and proper to receive work.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 6
3.02 CONCRETE FORMWORK
A. Construction of Forms:
1. General: Construct all required forms to be substantial, sufficiently tight to prevent leakage of concrete paste, and able to withstand excessive deflection when filled with wet concrete.
2. Layout:
a. Form for all required cast-in-place concrete to the shapes, sizes, lines and dimensions indicated on the Drawings.
b. Exercise particular care in the layout of forms to avoid necessity for cutting concrete after placement.
c. Make proper provisions for all openings, offsets, recesses, anchorages, blocking and other features of the Work as shown or required.
d. Perform all forming required for Work of other trades and do all cutting and repairing of forms required to permit such installation. e. Carefully examine the Drawings and Specifications and consult with other trades as required relative to providing for pipe and conduit penetrations, reglets, chases and other items in the forms.
3. Imbedded Items: Set all required steel frames, angles, bolts, inserts and other such items required to be anchored in the concrete prior to concrete being placed.
4. Bracings:
a. Properly brace and tie the forms together so as to maintain position and shape and to ensure safety to workmen.
b. Construct all bracing, supporting members and centering of ample size and strength to safely carry, without excessive deflection, all dead and live loads to which they may be subjected.
c. Properly space the forms apart and securely tie them together, using metal spreader ties that give positive tying and accurate spreading.
5. Wetting: Keep forms sufficiently wetted to prevent joints from opening up before concrete is placed.
B. Plywood Forms:
1. Design: Nail the plywood panels directly to studs and apply in a manner to minimize the number of joints.
2. Joints: Make all panel joints tight butt joints with all edges true and square.
C. Footing Forms:
1. Wood Forms: All footing forms shall be wood unless otherwise specifically approved by the Owner’s Representative, or as specified in paragraph 3.02(C)(2).
2. Earth Forms:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 7
a. Side walls for footings may be of earth provided the soil will stand without caving and the sides of the bank are made with a neat cut to the minimum dimensions indicated on the Drawings.
b. For excavation and backfill of earth forms, conform with applicable provisions of Section 13 11 01.
D. Reuse of Forms:
1. Reuse of forms shall be subject to advance approval of the Owner’s Representative.
2. Except as specifically approved in advance by the Owner’s Representative, reuse of forms shall in no way delay or change the schedule for placement of concrete from the schedule obtainable if all forms were new.
3. Except as specifically approved in advance by the Owner’s Representative, reuse of forms shall in no way impart less structural stability to the forms nor less acceptable appearance to finished concrete.
E. Removal of Forms:
1. General:
a. In general, side forms of footings may be removed seven (7) days after placement of concrete, but time may be extended if deemed necessary by the Owner’s Representative.
b. Forms for footings, foundations, grade beams, slabs, walls, and other formed concrete may be removed fourteen (14) days after placement of concrete.
2. Removal:
a. Use all means necessary to protect workers, passersby, the installed Work of other trades and the complete safety of the structure.
b. Cut nails and tie wires or form ties off flush, and leave all surfaces smooth and clean.
c. Remove metal spreader ties on exposed concrete by removing or snapping off inside the wall surface and pointing up and rubbing the resulting pockets to match the surrounding areas.
d. Flush all holes resulting from the use of spreader ties and sleeve nuts using water, and then solidly pack throughout the wall thickness with cement grout applied under pressure by means of a grouting gun; grout shall be one part Portland Cement to 2-1/2 parts sand; apply grout immediately after removing forms.
3.03 CONCRETE REINFORCEMENT
A. Bending:
1. General:
a. Fabricate all reinforcement in strict accordance with the Drawings. b. Do not use bars with kinks or bends not shown on the Drawings.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 8
c. Do not bend or straighten steel in a manner that will injure the material. (When opposite end is already encased in concrete.)
2. Design:
a. Bend all bars cold.
b. Make bends for stirrups and ties around a pin having a diameter of not less than two (2) times the minimum thickness of the bar.
c. Make bends for other bars, including hooks, around a pin having a diameter of not less than six (6) times the minimum thickness of the bar.
B. Placing:
1. General: Before the start of concrete placement, accurately place all concrete reinforcement, positively securing and supporting by concrete blocks, metal chairs or spacers, or by metal hangers.
2. Clearance:
a. Preserve clear space between bars of not less than one and one-half (1-1/2) times the nominal diameter of the round bars.
b. In no case let the clear space be less than one and one-half (1-1/2) inches nor less than one and one-third (1-1/3) times the maximum size of the aggregate. c. Provide the following minimum concrete covering of reinforcement:
1) Concrete deposited against earth: three (3) inches minimum. 2) Concrete below grade deposited against forms: two (2) inches minimum. 3) Concrete elsewhere: As indicated on Drawings or otherwise approved by the Owner’s Representative.
3. Splicing:
a. Horizontal Bars:
1) Place bars in horizontal members with minimum lap at splices sufficient to develop the strength of the bars.
2) Bars may be wired together at laps except at points of support of the member, at which points preserve clear space described above. 3) Whenever possible, stagger the splices of adjacent bars. 4) Splice forty (40) bar diameters minimum.
5) Provide non-contact lap slices for shotcrete.
b. Wire Fabric: Make all splices in wire fabric at least one and one-half (1-1/2) meshes wide.
c. Other Splices: Make only those other splices that are indicated on the Drawings or specifically approved by the Owner’s Representative.
4. Dowels: Place all required steel dowels and securely anchor them into position before concrete is placed.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 9
5. Obstructions: In the event conduits, piping, inserts, sleeves and other items interfere with placing reinforcement as indicated on the Drawings or otherwise required, immediately consult with the Owner’s Representative and obtain approval of a new procedure prior to placing concrete.
C. Cleaning Reinforcement: Steel reinforcement, at the time concrete is placed around it, shall be free from rust scale, loose mill scale, oil, paint and all other coatings which will destroy or reduce the bond between steel and concrete. Bend down all tie wire away from the top of the pool concrete. Maintain a 2” clear from top of concrete to the tie wire.
3.04 SHOTCRETE REINFORCEMENT
A. Shotcrete reinforcement shall be in accordance with the requirements of CBC 1908A and ACI 318-19, along with the provisions of ACI 506R and ACI 506.2. For parallel nonprestressed reinforcement in shotcrete members, the clear spacing between bars shall be at least the greater of 6 bar diameters and 2-1/2 in. Where two curtains of reinforcement are provided, the clear spacing between bars in the curtain nearer the nozzle shall be at least 12 bar diameters; the clear spacing between bars in the remaining curtain shall be at least the greater of 6 bar diameters and 2-1/2 in. Adequate encasement of bars larger than No. 5 shall be demonstrated by a preconstruction test shotcrete mockup panel.
B. Subject to the approval of the building official, it shall be permitted to use a clear spacing that does not meet the clear spacing provisions listed above provided that shotcrete mockup panels are used to demonstrate the proper reinforcement encasement in accordance with the following:
1. The shotcrete mockup panels shall be representative of the most complex reinforcement configurations to be encountered.
2. The licensed design professional shall specify the shotcrete mockup panel quantity, frequency of shooting per nozzleman and member type, and panel thickness to verify reinforcement encasement.
B. Non-contact lap splices for reinforcement in shotcrete shall have clear spacing in accordance with the following:
1. For No. 6 and smaller bars, the clear spacing between bars shall be at least greater of 6 bar diameters and 2-1/2” in.
2. For No. 7 and larger bars, the clear spacing shall be established using a shotcrete mockup panel to demonstrate that the reinforcement is properly encased.
Subject to the approval of the building official, contact lap splices for reinforcement in shotcrete shall be oriented with the plane of the spliced bars perpendicular to the surface of the shotcrete and approved by the licensed design professional based on a shotcrete mockup panel to demonstrate that the reinforcement is properly encased.
3.05 CAST-IN-PLACE CONCRETE
A. Conveying and Placing Concrete:
1. Before placing concrete, mixing and conveying equipment shall be well cleaned, and the For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 10
forms and space to be occupied by concrete shall be thoroughly cleaned and wetted.
Ground water shall be removed until the completion of the work.
2. No concrete shall be placed in any unit of work until all formwork has been completely constructed, all reinforcement has been secured in place, all items to be built into concrete are in place, and form ties at construction joints tightened.
3. Concrete shall be conveyed from mixer to place of final deposit in such a way to prevent the separation or loss of ingredients. It shall be placed as nearly as practicable in its’ final position to avoid rehandling or flowing. Concrete shall not be dropped freely where reinforcing bars will cause segregation, nor shall it be dropped freely more than six (6) feet.
Use tremies, spouts and dump boxes in deep sections. Vibrators are not acceptable for facilitating concrete transport.
4. Concrete shall be tamped and spaded to insure proper compaction into all parts of forms and around reinforcement. A mechanical vibrator shall be used to thoroughly compact the concrete. Vibration must be by direct action in the concrete and not against forms or reinforcement.
5. Mixing and transport time as indicated in ASTM C94 is required. If air temperatures are between 85° and 90° F the delivery time is to be reduced to 75 minutes. When air temperatures are in excess of 90° F the delivery time should be reduced to 60 minutes.
6. Truck mixes without batch certificates will be rejected.
B. Construction Joints / Expansion Joints: Construction joints and expansion joints shall be provided at locations and in the manner shown on the Drawings. With exception of existing concrete / new shotcrete joints, use PVC bulb-type waterstops appropriate for design condition between all concrete pours / lifts to avoid cold joints. Waterstops shall be placed in such a way to protect reinforcing steel from rust and oxidation. All expansion joints must be the full depth of the concrete section in which they are located.
C. Slab Finishes: Concrete slabs shall be compacted and screeded uniformly to grades shown.
Push large aggregates below the surface with a screen tamper, screed and bull float. As soon as the surface becomes workable, it shall be wood floated, then finished as indicated on the Drawings to a uniform smooth, true surface in a neat and workmanlike manner. Carefully coordinate slab finish requirements with other trades (ceramic tile, pool plaster) to insure concrete finish is appropriate substrate for final finish material.
1. Pool Floor Slab: Heavy Wire Broom Finish.
D. Protection and Curing:
1. Concrete shall be protected from injurious action of the elements and defacement of any nature during construction.
2. All forms must be kept wet to prevent drying out of the concrete.
3. All concrete surfaces including footings must be kept wet for at least seven (7) days after concrete is placed.
4. Apply the appropriate curing materials, as specified in 2.03 of this Section, immediately after finishing slabs. Application shall be as specified by the manufacturer.
E. Form Removal:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CONCRETE
13 11 02- 11
1. Take care in removing forms so that surfaces are not marred or gouged and that corners are true, sharp and unbroken.
2. No steel spreaders, ties or other metal shall project from or be visible on any concrete surfaces.
F. Defective Work:
1. Should the strength of any concrete for any portion of the work indicated by tests of molded cylinders and core tests fall below minimum 28 days strength specified or indicated, concrete will be deemed defective work and shall be replaced.
2. Concrete work that is not formed as indicated, is not true to intended alignment, not plumb or level where so intended, not true to intended grades or elevations, not true to specified or selected finish, contains sawdust shavings, wood, or embedded debris, which exhibits cracks or contains fine or coarse sulfide particles, or expansive aggregates detrimental to performance or appearance of the concrete shall be deemed defective.
3. Promptly perform work required to replace and properly clean (by sandblasting if necessary) any defective concrete panels (control joint or expansion joint to control joint or expansion joint), at Contractor's expense, including all expense of additional inspection, tests, or supervision made necessary as a result of defective concrete.
3.06 EXPANSION JOINTS
A. Temperatures: Do not install sealants when air temperature is less than 40°F.
B. Tooling: Tool exposed joints to a slightly concave surface using slicking materials recommended by the manufacturer. The tooling procedure shall press sealant against the sides of the joint. No materials shall be left “feathered” out or smeared on the abutting materials. Completed joints shall have a uniform professional appearance.
C. Joint Construction: Sealant joint width, thickness and cross-sectional profile to be constructed in strict accordance with the sealant manufacturer’s recommendations.
D. Sand: At the appropriate time cover the sealant with sand to provide a sanded finish.
3.07 CLEAN-UP
A. Upon completion of the Work of this Section, immediately remove all swimming pool concrete materials, debris and rubbish occasioned by this Work to the approval of the Owner’s Representative.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CERAMIC TILE
13 11 04 - 1
SECTION 13 11 04
SWIMMING POOL CERAMIC TILE
PART 1 GENERAL
1.01 WORK INCLUDED
A. Swimming pool ceramic tile detailed on the Drawings, including, but not limited to, the following:
1. Waterline Face Tile.
2. Gutter Cap Tile.
3. Lane Line / Target Tile / 4’-6” Depth Tile.
4. Trim Tile. (At Underwater Steps)
5. Floor Inlet Tile
6. 15M Marker Tile
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Standards: In addition to complying with all pertinent codes and regulations:
1. Manufacture of all tile shall be in accordance with ANSI A-137.1-1976.
2. Install ceramic tile in accordance with the recommendations contained in the 2025 “Handbook for Ceramic Tile Installation” of the Tile Council of America, Inc.
C. Tolerances: Install all swimming pool ceramic tile straight, true, plumb and square within a tolerance horizontally and vertically of 1/8”. Waterline and gutter bullnose tile shall be level to 1/8” (+/- 1/16”) around entire perimeter of swimming pools.
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 01 33 00. Requests for substitution shall conform to requirements of Article 1.10.A of Section 13 11 00.
B. Samples: Submit samples of each color and pattern in the specified groups. Character samples can be representative for review prior to screening of actual tile.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CERAMIC TILE
13 11 04 - 2
C. Master Grade Certificate: Prior to opening ceramic tile containers, submit a Master Grade Certificate, signed by the manufacturer of the tile used and issued when the shipment is made, stating the grade, kind of tile, identification marks for the tile containers, and the name and location of the Project.
D. Specifications: Submit manufacturer's recommended installation specifications for the Work.
E. Submit proof of qualifications as specified in Article 1.02.A of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver all materials to the Project Site in the manufacturer’s original unopened containers with all labels intact and legible.
B. Storage: Store all materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project site.
C. Protection: Use all means necessary to protect swimming pool ceramic tile before, during and after installation and to protect the installed Work specified in other Sections.
D. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner.
PART 2 - PRODUCTS
2.01 TILE
A. Waterline Face Tile:
1. Material: All waterline face tile shall be glazed ceramic tile (Group III standard) as manufactured by Dal-Tile or approved equal.
2. Size: 6 x 6 inches.
3. Color: Dal-Tile # #O-129, 'Sky Blue'. Contact Kylee Midura [email protected] (858) 344-0019. Color to match existing tile.
B. Gutter Cap Tile:
1. Material: All gutter cap tile shall be glazed ceramic tile (Group III standard) as manufactured by Dal-Tile or approved equal.
2. Size: 2-1/2 x 6 inches (#A-7250).
3. Color: Dal-Tile #D-129, 'Sky Blue'. Color to match existing tile.
4. EKO3 stainless steel gutter cap #DP108-00004 at all rope anchor and water polo rope anchor locations.
C. Lane Line / Target Tile / 4'-6" Depth Tile:
1. Material: Group 4 quality, frost proof unglazed porcelain mosaic tile with absorption rate of less than 1% as manufactured by Dal-Tile or approved equal.
2. Size: 1 x 1 inches.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CERAMIC TILE
13 11 04 - 3
3. Color: Dal-Tile #D-311, 'Black’ in 50M direction and target tile. #D-621 Nautical Blue in 25 yard direction and target tile.
4. Color: Dal-Tile #D-621 ‘Nautical Blue’ at 4’-6” depth tile.
D. Trim Tile (on underwater steps)
1. Material: Group 3 quality, frost proof unglazed ceramic mosaic tile with absorption rate of less than 1% as manufactured by Dal-Tile or approved equal.
2. Size: 1 x 1 inches, with S-812 quarter round. Color: Dal-Tile #D-311, ‘Black’.
3. Size: 1 x 2 with integral quarter round. Color: Black, non-slip. Inlays #CPC00022.
E. Floor Inlet Tile:
1. Material: Group 1 quality, frost proof unglazed porcelain mosaic tile with absorption rate of less than 1% as manufactured by Dal-Tile or approved equal.
2. Size: 2 x 2 inches. 18” x 18” around each floor inlet.
3. Color: Dal-Tile #D-617, ‘Artic White’.
F. 15 M Marker Tile
1. Material: Group S quality, frost proof unglazed mosaic tile with absorption rate of less than 1% as manufactured by Dal-Tile or approved equal.
2. Size: 1 x 1 inches.
3. Color: Dal-Tile #D-017 Red
2.02 MORTAR
A. Laticrete 3701 fortified mortar #LCR-37-1017.
B. Water: From a potable source.
C. Mortar shall meet ASTM C627.
2.03 WATERPROOFING
A. Laticrete HYDRO BAN
B. Install per manufacturer’s recommendations with other Laticrete products as listed.
2.04 THIN SET MORTAR
A. Laticrete 254 Platinum. Laticrete, Custom or equal.
B. Water from a potable source.
C. Mortar shall meet ASTM C627.
2.04 GROUT
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CERAMIC TILE
13 11 04 - 4
A. All tile grout shall be waterproof grout complying with the recommendations of referenced standards. Grout color shall be grey for dark backgrounds, white for light backgrounds (verify colors with Architect). Grout shall be per Laticrete Spectralock Pro Premium Epoxy Grout installed per manufacturer recommendations.
2.05 OTHER MATERIALS
A. All other materials, not specifically described but required for a complete and proper installation of ceramic tile as indicated on the Drawings, shall be new, first quality of their respective kinds, and subject to the approval of the Owner’s Representative.
PART 3 - EXECUTION
3.01 SURFACE CONDITIONS
A. Inspection:
1. Prior to all Work of this Section, carefully inspect the installed Work of other trades and verify that all such Work is complete to the point where this installation may properly commence.
2. Verify that ceramic tile can be installed in accordance with the original design and all referenced standards.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Owner’s Representative.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.
3. Failure to notify the Owner’s Representative and give written notice of discrepancies shall constitute acceptance by the Contractor of existing conditions as fit and proper to receive its Work.
3.02 INSTALLATION
A. Method:
1. Install all ceramic tile in strict accordance with installation method P601-90 of the 2025 Handbook for Ceramic Tile Installation of the Tile Council of America, Inc.
2. Be certain to install all ceramic tile perfectly level, flush, plumb, and to the finish grades and elevations indicated on the Drawings.
B. Interface:
1. Carefully establish and follow the required horizontal and vertical elevations to insure proper and adequate space for the work and materials of other trades.
2. Coordinate and cooperate as required with other trades to insure proper and adequate interface of ceramic tile Work with the Work of other trades.
3.03 GROUTING
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL CERAMIC TILE
13 11 04 - 5
A. Follow grout manufacturer's recommendations as to grouting procedures and precautions.
B. Remove all grout haze, observing grout manufacturer's recommendations as to use of acid and chemical cleaners.
3.04 EXTRA STOCK
A. Provide one (1) unopened box of extra tile for 2.01A, 2.01B, 2.01C and 2.01E for Owners use at a future time.
3.05 CLEAN-UP
A. Upon completion of the swimming pool ceramic tile installation, thoroughly clean and polish the exposed surfaces of tile work. Completely clean work area of debris and rubbish occasioned by this Work and dispose of to the approval of the Owner’s Representative.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 1
SECTION 13 11 05
SWIMMING POOL PLASTER
PART 1 GENERAL
1.01 WORK INCLUDED
A. Swimming pool plaster and waterproofing of swimming pool structures as indicated on the Drawings and herein specified.
B. Start-up and operation instructions to Owner’s operations and maintenance personnel and properly balance swimming pool water chemistry until the Owner takes occupancy.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Standards: Swimming pool plaster shall conform with requirements of Chapter 31B of California Building Code, 2022 edition. In addition, meet requirements of applicable portions of most current edition of the “Technical Manual,” National Plasterers Council, Wauconda, Illinois.
C. Start-up:
1. Furnish a swimming pool water chemistry consultant, with a minimum of five (5) years experience, possessing either AFO (Aquatic Facility Operator) or CPO (Certified Pool Operator) certification(s), to supervise and properly balance swimming pool water chemistry.
2. Demonstrate to the Owner that all systems are fully operational and that calcium hardness, total alkalinity, chlorine residual and pH levels are within specified limits.
3. Standards: Furnish labor and chemicals as required to condition the water properly to the following specifications:
a. Calcium Hardness: 200-400 parts per million (PPM)
b. Total Alkalinity: 80-100 PPM
c. Chlorine Residual: 1.00 to 2.0 PPM
d. pH Factor: 7.2 to 7.6
1.03 SUBMITTALS AND SUBSTITUTIONS
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 2
A. Provide submittals in conformance with the requirements of Section 01 33 00. Requests for substitution shall conform with requirements of Article 1.10.A of Section 13 11 00.
B. Submit proof of qualifications as specified in Article 1.02.A and 1.02.C.1 of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver materials to the Project Site in the manufacturer's original unopened containers with all labels intact and legible.
B. Storage: Store materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project Site.
C. Protection: Use all means necessary to protect the swimming pool plaster before, during, and after installation and to protect the installed Work specified in other Sections.
D. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner.
1.05 ENVIRONMENTAL CONDITIONS
A. No plastering shall be done under unsuitable conditions of weather or temperature. No plastering shall be done when prevailing temperature is 40 degrees Fahrenheit or less.
B. Do not install plaster during rain and, if rain commences after plastering has begun, immediately protect the plaster from rain by all means necessary until the plaster has set.
C. Do not install plaster during wind greater than 10 mph and, if wind commences after plastering has begun, immediately protect the plaster from wind by all means necessary until the plaster has set.
PART 2 PRODUCTS
2.01 CEMENT / AGGREGATE
A. Luna Quartz® tiny pebble finish by Wet Edge Technologies. Altima® quartz finish by Wet Edge Technologies. Pebble-Fina® pool finish by Pebble Technologies. Wet Edge Technologies, Pebble Technologies, Commercial Quartz or equal.
2.02 COLOR
A. All swimming pool plaster shall be white in color. Wet Edge Technologies shall be Luna Quartz® “Polar White”. Wet Edge Technologies shall be Altima® “White”. Pebble Technology shall be Pebble-Fina® “Classico”. Commercial Quartz ‘Commercial White’.
Contractor to obtain written approval on selected pebble color from the local Health Department prior to installation. Submit cut sheet, color sample and written approval for review by Architect and Owner.”
2.03 WATER
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 3
A. Water for swimming pool plaster shall be clean and free from injurious amounts of acid, alkali, and organics.
2.04 GUTTER, PUMP PIT, BACKWASH PIT & SURGE CHAMBER WATERPROOFING A. Xypex Concentrate, Miracote Miraflex Membrane C, Hycrete Waterproofing System or approved equal. Mix and apply per manufacturer’s recommendations for specific application. Color shall be Gray.
PART 3 EXECUTION
3.01 SURFACE CONDITIONS
A. Inspection:
1. Prior to Work of this Section, carefully inspect the installed Work of other trades and verify that all such Work is complete to the point where this installation can properly commence.
2. Verify that swimming pool plaster can be installed in accordance with the original design and all referenced standards, including proprietary application techniques and application training/certifications.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Owner's Representative.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.
3. Failure to notify the Owner's Representative and give written notice of discrepancies shall constitute acceptance by the Contractor of existing conditions as fit and proper to receive the Work.
3.02 INSTALLATION OF GUTTER, PUMP PIT, BACKWASH PIT & SURGE CHAMBER
WATERPROOFING
A. Provide two (2) coats of the specified gutter and surge chamber waterproofing prior to plastering the swimming pool. Prepare surfaces to receive waterproofing and cure in conformance with manufacturer's recommendations. Provide steel trowel application method to ensure uniform smooth, dense surface finish.
3.03 INSTALLATION OF POOL PLASTER
A. Outdoor Pools or Spas:
1. Completion of other work: DO NOT commence plastering of swimming pool(s) or spa(s) until the following conditions have been met:
a. The Health Department and/or other governing agencies have approved the pool(s) and/or spas) for plaster.
b. All concrete pool deck construction is complete and the pool decks have been For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 4
thoroughly cleaned.
c. All landscaping in areas adjacent to the pool(s) or spa(s) is complete and the landscape irrigation system is operable.
d. All painting in the pool area is complete.
e. All welding and grinding in locations adjacent to the pool area are complete. f. The backwash sewer connection is complete.
g. Pool(s) and/or spa(s) area(s) perimeter fencing installation is complete. h. All trash and debris have been removed from areas adjacent to the pool(s) or spa(s), particularly those areas that are normally upwind from the pool(s) or spa(s). i. All dust raising construction and/or activities in areas adjacent to the pool(s) or spa(s) are complete or mitigated.
j. The circulation pump(s) is/are operational.
k. The mechanical system has been flushed sufficiently to remove all dirt and debris from the piping system.
l. All necessary chemicals (Chorine, pH adjuster, Sodium Bicarbonate and Calcium Chloride or any other required chemicals) are on site and ready for use. m. Obtain written approval from the Owner and the Architect.
B. Indoor Pools or Spas:
1. Completion of Other Work: DO NOT commence plastering of swimming pool(s) or spa(s) until the following conditions have been met:
a. The Health Department has approved the pool(s) and/or spa(s) for plaster. b. All work above the pool(s) and/or spa(s) is complete. c. All painting in the pool area is complete.
d. All welding and grinding in locations adjacent to the pool area are complete. e. The backwash sewer connection is complete.
f. All concrete pool deck construction is complete and the pool decks have been thoroughly cleaned.
g. The circulation pump(s) is/are operation.
h. The mechanical system has been flushed sufficiently to remove all dirt and debris from the piping system.
i. All necessary chemicals (Chlorine, Acid, Sodium Bicarbonate and Calcium Chloride) are on site and ready to use.
j. Obtain written approval from the Owner and the Architect.
C. Contractor accepts all liability from damage done to the pool plaster if the pool(s) or spa(s) is (are) plaster before the completion of the above listed items or without the written approval of the Owner and the Architect.
D. POOL PLASTER AUTHORIZATION FORM:
1. The pool(s) and or spa(s) at Roseville Aquatics Complex is/are hereby approved for the installation of the pool plaster. Pursuant to the requirements of specification section 13 11 05, paragraph 3.03.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 5
Owner Date
Architect / Project Manager Date
E. Preparation:
1. Do not apply plaster over dirt, rust, scale, grease, moisture, scuffed surfaces or conditions otherwise detrimental to the formation of a durable plaster finish.
2. Consult with manufacturer on application to specific surfaces being treated. Follow manufacturer's recommendation for curing of cast-in-place concrete or shotcrete surfaces prior to application of plaster.
3. Protect ceramic tile, decking, deck equipment, gratings, fittings and other items by suitable covering or masking.
4. Mask or remove all hardware, hardware accessories, machined surfaces, plates, lighting fixtures and similar items in place not to receive pool plaster. Following completion of plaster for each space or area remove masking. Re-install all removed items utilizing workers skilled in the trades involved.
F. Application:
1. Finish shall be applied to a ½” minimum thickness over the entire surface. The walls shall be scratch-coated followed by a finish coat. Material applied to the floor after the walls have been applied shall be accelerated to assure uniform setting time throughout the pool surface.
2. Float the plaster to a uniform plane and trowel to a smooth, dense, impervious surface using extreme care to avoid stains.
3. Take special care in finishing around pool fittings, making sure to mask off or plug openings so as not to fill such openings with excess plaster. Be certain to completely enclose pool fittings with plaster to insure a leak-proof seal around pipes, fittings, lights, anchors, etc.
4. Accurately interface with the finish planes of items installed by other trades.
5. Quartz and pebble plaster finish is to be applied by a licensed applicator as approved by the manufacturer, and in accordance with manufacturer’s training.
3.04 CURING
A. Preparation: Anticipate the need for required equipment and have all such equipment immediately available for use upon completion of pool plastering.
B. Pool Filling:
1. After the plaster has sufficiently dried and before drying has proceeded to a damaging point, cure the plaster by gradually filling the pool with water, preventing all damage to finished plaster surfaces.
2. Flow the water continuously until the pool is filled.
3. When the weather is hot and/or water pressure is low, keep the pool walls damp while the pool is filling.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL PLASTER
13 11 05 - 6
4. Coordinate with Contractor to ensure that the pool is continuously monitored while filling to prevent overfill.
3.05 EQUIPMENT ACTIVATION
A. All water chemistry and filtration mechanical equipment shall be operational upon filling of pool after plaster. Chemicals and other related support items as supplied by Contractor, shall be in supply at start-up.
B. For the first fourteen (14) calendar days after completion of the pool plaster, brush all plastered surfaces at least twice a day and coordinate with General Contractor to ensure that the plaster is carefully maintained after the initial fourteen day period. In addition, coordinate with the Contractor to ensure that pool filtration equipment is continuously running during the initial fourteen day period.
C. Start-up and provide qualified personnel to operate pool equipment for a period not less than fourteen (14) days after the pool is placed in operation, or until the Owner takes occupancy of the facility or letter of substantial completion. During this time, Contractor shall instruct and supervise the Owner's personnel in the various operating and maintenance techniques involved. Contractor shall be responsible for supply of chemicals during this not less than fourteen (14) day period and at time of turnover to Owner, chemical storage tanks shall be full. (Owner's personnel shall be fully trained and capable of assuming swimming pool maintenance tasks, training may begin before Owner takes occupancy).
3.06 CLEAN-UP
A. Upon completion of swimming pool plaster, remove all materials, equipment and debris occasioned by this Work and leave the job site in a clean and presentable condition. Perform all such clean-up to the approval of the Owner’s Representative.
3.07 WARRANTY
A. All applicators must provide a minimum of five (5) year warranty for application and workmanship additional to the manufacturer’s warranty for product.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL EQUIPMENT
13 11 06 - 1
SECTION 13 11 06
SWIMMING POOL EQUIPMENT
PART 1 GENERAL
1.01 WORK INCLUDED
A. Swimming pool equipment items required for this Work as indicated on the Drawings and specified herein.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. All equipment supplied or work performed shall comply with regulations governing public swimming pools and spas as contained within Chapter 31 of California Building Code, 2022 edition.
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 01 33 00. Requests for substitution shall conform with requirements of Article 1.10.A of Section 13 11 00.
B. Required submittals include:
1. Swimming Pool Fittings as specified in Article 2.01 of this Section.
2. Swimming Pool Deck and Mechanical Equipment as specified in Article 2.02 of this Section.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
D. The equipment shown on the plans represent the first listed items in the technical specifications. The Contractor shall be responsible for all required field coordination and installation of any approved equal product to provide a fully working and warranted system.
The Contractor shall submit detailed shop drawings for any products used other than the first listed specified items. Contractor provided shop drawings shall include details and quality equal to the original plans and construction documents. The Contractor shall provide any and all required engineering including but not limited to structural and anchorage requirements for any proposed equipment other than the first listed specified equipment. The Contractor is For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL EQUIPMENT
13 11 06 - 2
responsible to provide a factory certified representative(s) to start-up and provide on-site training for all swimming pool mechanical equipment provided.
1.04 PRODUCT HANDLING
A. Protection: Use all means necessary to protect swimming pool equipment items before, during and after installation and to protect the installed work specified in other Sections.
B. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner’s Representative.
PART 2 PRODUCTS
2.03 FITTINGS
A. (N) Floor Inlet Covers 1-1/2” Adjustable: StaRite #08417-0000, United Industries, or approved equal. Seventy-six (76) total.
B. (N) Swimming Pool Underwater Lights: Jandy niched white LED lights #WPHV5LS100 large white LED LIGHT, 120V 500 kelvin, 65 watt bulb, 100’ cord (field verify cord length prior to ordering). Thirty-six (36) required. Provide with existing stainless-steel niche. Jandy, Pentair, or approved equal.
C. (N) Main Drain Sump & Grate (18” x 36”) Daldorado DALMAX-SG-183634; two (2) required. ‘Hayward’ 1-1/2” collector tubes #SP1056 and ‘Hayward’ 1-1/2” hydrostatic relief valves #SP1055, one per main drain sump. Contractor shall provide to the Owner a Certificate of Compliance, signed by a licensed design professional, for main drain sump(s) and frame(s) and grate(s), as required by the Virginia Graeme Baker Act.
2.03 DECK EQUIPMENT
A. (N) Handrails: Spectrum #35127-720, 1.90" O.D. x .145" wall, type 304 with 320 grit finish.
Spectrum, KDI-Paragon, S.R. Smith, or Aqua Creek. Five (5) required.
B. (N) Figure 4 Grabrails: Spectrum #35099-26-.145, 1.90" O.D. x .145" wall, Spectrum, KDIParagon, S.R. Smith, or Aqua Creek. Four (4) pairs required.
C. (N) Recessed Steps: Spectrum #183013, Sixteen (16) required. Spectrum, or equal.
D. (N) Crossed Braced Ladder: Cross-Braced Ladder: Paragon #42123 Custom, KDI-Paragon, S.R.
Smith, Paddock, Aqua Creek or Spectrum. Two (2) required.
E. (E) Anchors Sockets for Handrails, Grabrails and Ladders: Spectrum #24010-00, KDI-Paragon 28102, Spectrum, KDI-Paragon, S.R. Smith, or Paddock. Replace if damaged.
F. (N) Stainless steel Escutcheon Plates for Grab Rails, Hand Rails & Ladders: Spectrum Model #35214, Spectrum, KDI-Paragon, S.R. Smith, or Paddock.
PART 3 EXECUTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL EQUIPMENT
13 11 06 - 3
3.01 SURFACE CONDITIONS
A. Inspection:
1. Prior to installing the items of this Section, carefully inspect the installed Work of other trades and verify that all such Work is complete to the point where this installation may properly commence.
2. Verify that the swimming pool equipment items may be installed in strict accordance with original design, pertinent codes and regulations, and the manufacturers' recommendations.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Owner’s Representative.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies are fully resolved.
3. Failure to notify the Owner’s Representative and give written notice of discrepancies shall constitute acceptance by the Installer of existing conditions as fit and proper to receive its Work.
3.02 INSTALLATION
A. Supply and install items of swimming pool equipment in strict accordance with applicable codes and regulations, the original design, and the manufacturer's published recommendations, anchoring firmly and securely for long life under hard use.
B. Coordinate with other trades to insure all imbedded items are set plumb and flush. Railing ends must have anchor sockets and escutcheon plates. Be certain that deck equipment and railings are properly bonded prior to imbedding.
C. All equipment shall be braced and/or anchored to resist a horizontal force acting in any direction using the criteria shown on the Drawings.
3.03 INSTRUCTION
A. The Contractor shall provide a factory certified representative(s) to start-up and certify proper installation, operation and full warranty status of all swimming pool mechanical equipment. The Contractor shall provide not less than two 8-hour days of on-site training for facility staff in the operation and maintenance of the swimming pool mechanical equipment and systems. The two 8-hour days shall be separated by a minimum of seven calendar days and be completed within the 14-day start-up period.
3.04 EQUIPMENT ACTIVATION
A. All water chemistry and filtration mechanical equipment shall be operational upon filling of pool after plaster. Chemicals and other related support items as supplied by Contractor, shall be in supply at start-up.
B. For the first fourteen (14) calendar days after completion of the pool plaster, brush all plastered surfaces at least twice a day and coordinate with General Contractor to ensure that the plaster is For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL EQUIPMENT
13 11 06 - 4
carefully maintained after the initial fourteen day period. In addition, coordinate with the Contractor to ensure that pool filtration equipment is continuously running during the initial fourteen day period.
C. Start-up and provide qualified personnel to operate pool equipment for a period not less than fourteen (14) days after the pool is placed in operation, or until the Owner takes occupancy of the facility or letter of substantial completion. During this time, Contractor shall instruct and supervise the Owner's personnel in the various operating and maintenance techniques involved. Contractor shall be responsible for supply of chemicals during this not less than fourteen (14) day period and at time of turnover to Owner, chemical storage tanks shall be full. (Owner's personnel shall be fully trained and capable of assuming swimming pool maintenance tasks, training may begin before Owner takes occupancy).
3.05 CLEAN-UP
A. Upon completion of swimming pool equipment, remove all debris, materials and equipment occasioned by this Work to the approval of the Owner’s Representative.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 1
SECTION 13 11 07
SWIMMING POOL MECHANICAL
PART 1 GENERAL
1.01 WORK INCLUDED
A. Swimming pool mechanical piping as indicated on the Drawings for circulation and filtration systems, pool water heating systems, chemical control systems, booster pump systems and appurtenances.
B. Domestic water system from points of connection within swimming pool mechanical equipment room to make-up water system.
C. Filter backwash piping to point of connection with backwash retention pit as required.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Standards:
1. All equipment supplied or work performed shall comply with Chapter 31 of California Building Code,2022edition.
2. Work shall be performed in accordance with the applicable editions of all National, State and local codes, laws, regulations and ordinances, including the following:
a. American National Standards Institute (ANSI).
b. American Society for Testing Materials (ASTM).
c. American Waterworks Association (AWWA).
d. American Welding Society (AWS).
3. Do not construe anything in the Drawings or Specifications to permit Work not conforming to these requirements.
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 01 33 00. Requests for substitutions shall conform with requirements of Article 1.10.A of Section 13 11 00.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 2
B. Required submittals include:
1. Pipe and Fittings as specified in Article 2.02 of this Section.
2. Valves as specified in Article 2.03 of this Section.
3. Pressure / Vacuum Gauges as specified in Article 2.04 of this Section.
4. Pipe Hangers and Supports as specified in Article 2.05 of this Section.
5. Sleeves and Waterstops as specified in Article 2.06 of this Section.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver all materials to the Project Site in the manufacturer’s original unopened containers with all labels intact and legible.
B. Storage: Store all materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project site.
C. Protection: Use all means necessary to protect swimming pool mechanical items before, during and after installation and to protect the installed Work specified in other Sections.
D. Replacements: In the event of damage, immediately make all repairs and replacements necessary to the approval of the Owner and at no additional cost to the Owner.
1.05 JOB CONDITIONS
A. Cooperate with entities performing Work specified in other Sections to so that no conflict of new construction or occupied space may occur. Should any installation Work be done without such craft coordination, that Work so installed shall be removed and re-installed.
PART 2 PRODUCTS
2.01 PRODUCT QUALITY
A. Materials and equipment shall be new, of the best quality for the purpose intended, and shall be clearly marked with the manufacturer's name and nameplate data or stamp and rating. As far as practicable, materials and equipment shall be of one manufacturer.
2.02 PIPE AND FITTINGS
A. PVC Schedule 40: Type 1, normal impact, NSF approved for solvent welding applications, ASTM Specification D-1785, color shall be white. Dura, Lasco, or approved equal.
B. PVC Schedule 80: Type 1, normal impact, NSF approved for solvent welding applications, ASTM Specification D-1785, color shall be gray. Dura, Lasco, or approved equal.
C. CPVC Schedule 80 Influent/Effluent Heater Piping: Type 1, normal impact, NSF approved for solvent welding applications, ASTM Specification D-1785, color shall be gray. Dura, or Lasco.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 3
D. Cold plunge piping shall be schedule 80 throughout, from the cold plunge to the pool mechanical room. Install insulation on all cold-water PVC schedule 80 piping. Provide NBR/PVC closed-cell pipe insulation, pre-slit, pre-glued with overlap, ¾” wall thickness with a temperature range between -70° to 220°F for schedule 80 PVC pipe. Install pipe insulation per the manufacturer’s recommendations.
E. PVC SDR35: Conforming to ATSM D-1784, use with epoxy coated bell and spigot-type fittings or epoxy coated mechanical joint by flange adapters with epoxy coated cast iron fittings as specified in Article 2.02 (G), below. Johns-Manville "Big Blue", Diamond Plastics, or approved equal.
F. Copper Tubing: ASTM Specification B-88, hard drawn, with ANSI Standard B16.22 wrot copper fittings.
G. Steel: ASTM Specification A-120, Schedule 40 black or galvanized pipe with ASTM A-47 150 lb. banded malleable iron threaded fittings.
H. Cast Iron: ASTM Specification B16.1, cast iron flanged fittings, provide epoxy coating as required for use with chlorinated water.
2.03 VALVES
A. Ball Valves:
1. For pool system: True-Union design, PTFE seat material with FPM or FKM Double Oring stem seals, locking handle, NSF certified. PVC schedule 80 body for below grade installation. PVC Schedule 80 body for above grade installation. Furnish ball valves on all pip diameters 2 ½” or less with a rating of at least 200psi at 73° F, Asahi, Ipex or Nibco.
2. For copper pipe system: 3-piece full-port Bronze body valve with Teflon seat, ‘Apollo’, ‘Nibco’ or approved equal.
B. Butterfly Valves:
1. Epoxy coated cast or ductile iron body, 316 stainless steel disc and stem, viton seat material, furnish hand wheel/gear operators on all valves 8" and larger. DeZurick, Keystone, Ipex or equal.
2. PVC body, PVC disc and EPDM construction suitable for chlorinated water applications.
Stem shall be of 316 stainless steel and non-wetted. Valves shall be self-gasketed design with a convex sealing arrangement. Valves 1-1/2” – 10” shall be rated to 150 psi and 12” valves shall be rated to 100 psi at 70°F. Asahi Pool-Pro, no known equal.
C. Check Valves: Wafer-type, epoxy coated cast or ductile iron body, 316 stainless steel plates and shaft, viton seat material. Centerline, Metraflex, or approved equal.
D. Surge Chamber Float Valve: EPD #2-0020-019 Float Control Valve, " line size, as manufactured by Environmental Products Division of Doughboy Recreational, Rancho For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 4
Cucamonga, CA, no known equal.
E. Surge Chamber Isolation Valve: Butterfly valve, tapped lug style, bronze body, stainless steel stem, bronze disc, phenolic back-up ring, EPT seat material. Provide stainless steel shaft extension, shaft housing and tool operator located 2’-0” above floor level with deck access grate as required. DeZurick, Keystone, Asahi, Spears, Ipex or approved equal.
F. RP Backflow Preventer: Febco #835-B for 2" and smaller; #825 for 2-1/2" and larger. Febco, Watts, or approved equal.
G. Make-up Water Control: Cla-Val make-up water control valve with ductile iron body/cover, bronze trim, globe pattern, Buna-N rubber seals. Pilot system materials to consist of bronze/brass with stainless steel wetted parts and Buna-N rubber seals.
System to include: 100-01 Hytrol valve, CF1-C1KX float control, X46A flow clean strainers, and copper tubing with brass fittings. Float linkage and float rod shall be PVC and brass.
Base plate shall be 316 stainless steel. The plastic float shall be provided with 8’ PVC rod and stops and a brass counter weight. Provide model #124-01AKX available KSI (714) 754-044.
2.04 PRESSURE / VACUUM GAUGES
A. Furnish and install pressure and vacuum gauges on the discharge and suction sides of all pumps. 2” or 2 1/2" diameter dial, bottom connection, chrome ring, shut-off cock and snubber.
Ranges shall be selected to indicate between mid-point and two-thirds of maximum range under design conditions. Marsh, Trerice, or approved equal.
2.05 PIPE HANGERS AND SUPPORTS
A. General:
1. The requirements of this Section relates to various requirements of the Agreement, General and Supplementary Conditions, Specifications, Drawings, and modifying documents which are part of the Construction Contract. Responsibility for coordination of all such applicable requirements will be that of the Contractor.
B. Description:
1. This section provides guidelines and limitations for the support of all mechanical, electrical, plumbing or architectural items from the building structure, and for the seismic bracing of such items.
2. Design and install all support and bracing systems as required for the swimming pool systems. Provide for attachment to portions of the building structure capable of bearing the loads imposed. Design these systems to not overstress the building structure.
C. Quality Assurance:
1. Design and install all support systems to comply with the requirements of the 2022 California Building Code, Chapter 16A.
2. Seismic bracing is to be designed by a professional engineer licensed in the State of For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 5
California.
D. Submittals:
1. Submit shop drawings for all substructures and attachment methods.
2. Submit proposed alternative methods of attachment for review and approval by the Architects, prior to deviating from the requirements given below.
3. For all pipe hangers and support systems, submit structural calculations and details which include all resultant forces applied to the building structure and are prepared and signed by the Contractor’s licensed California professional engineer. Calculations will be reviewed for compliance with design criteria, not for arithmetic.
E. Materials:
1. Use Kin-Line, Grinnel, or approved equal.
2. Support all pipelines individually with hangers, each branch having at least one hanger.
Lateral brace as noted and required.
3. Support piping near floor with steel stanchions welded to end plates secured to pipe and floor.
4. Support vertical piping at each floor level. Install coupling in piping at each support.
Coupling shall rest on and transmit load to support. Isolate copper from steel supports with vinyl electrician's tape around pipe and coupling.
5. Use Stoneman "Trisolator," Unistrut, or approved equal, isolators at each hanger and other support points on bare copper tubing system.
6. For PVC pipe, space hangers four (4) feet apart for pipe sizes 1" and under, five (5) feet apart for pipe sizes 1-1/4" to 2", and six (6) feet apart for pipe sizes over 2". Space hangers for horizontal pipes at a maximum of six (6) feet for copper 2" and smaller and for steel 1-1/4" and smaller; ten (10) feet for copper 2-1/2" and larger and for steel 1-1/2" and larger.
7. Size hanger rods, screws, bolts, nuts, etc., according to manufacturer's sizing charts.
8. Trapeze hangers may be used for parallel lines.
9. Use galvanized or stainless steel hangers, attachments, rods, nuts, bolts, and other accessories in pool mechanical room, high humidity areas, or where exposed to weather. Hot dip galvanize all items which are not factory furnished. Plating for hinged movements must be done at the factory.
10. Lateral Bracing: To prevent swaying of the piping systems, provide angle iron bracing and anchor into wall or overhead framing. Piping shall be braced or anchored in such a way as to resist a horizontal force of 50% of its operating weight in any direction.
11. Do not use wire or other makeshift devices for hangers.
12. Furnish all substructures and fasteners required to comply with the limitations given below. Use material as specified in the various sections and as appropriate to their use.
13. Install stainless steel or FRP Unistrut, pipe clamps/hangers, supports/bracing with stainless steel hardware in the chemical storage rooms, surge/balance tanks, or any other corrosive environment.
F. Guidelines & Limitations:
1. Each Contractor will coordinate the load requirements from all subcontractors so that no combination of loads overstresses the building structure or exceed the limitations given For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 6
below.
2. Concrete Structure:
a. Support all loads hung from concrete structure with cast-in-place inserts, unless drilled-in anchors are specifically approved in writing prior to placing the concrete. b. Concrete anchors must not penetrate into reinforcing bars. Where the anchors boring indicates the presence of reinforcing bar, patch hole with an epoxy type grout and relocate anchor 12 diameters away.
c. Individual expansion anchors cannot support any loads greater than 300 pounds or manufacturer’s specified load capacity without approval.
3. Steel Structure:
a. Hang no more than 20 pounds per metal deck rib in any span. b. At beams, hang all beam loads greater than 40 pounds concentric to beam, not off the flanges.
c. Attached no loads to the beams or girders greater than the following without specific approval from the architect;
i. Roof beams and girders: 300 pound point load or 600 pound total load for a single span.
G. Seismic Bracing:
1. Design and install seismic bracing to not ground out vibration and sound isolation systems.
2. All items of mechanical and electrical equipment 60” or more in height are to be seismically braced whether such bracing is shown or not.
2.06 SLEEVES AND WATERSTOPS
A. Provide sleeves where work of this Section passes through fire rated partitions, floors and ceilings, concrete slabs or exterior of structure. Caulk clearance space using sealant appropriate for application in conformance with manufacturer's recommendations and Title 24 of California Code of Regulations. 3m, Dow Corning, or approved equal. In lieu of sleeves and caulking, "Link Seal" products may be used.
B. Provide prefabricated waterstops as indicated on the Drawings at all pipe penetrations through structures containing stored water (i.e., swimming pools, balance/surge tanks, etc.) to insure leak-proof seals.
PART 3 EXECUTION
3.01 SURFACE CONDITIONS
A. Inspection:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 7
1. Prior to Work of this Section, carefully inspect the installed Work of other trades and verify that such work is complete to the point where this installation may properly commence.
2. Verify that items of this Section may be installed in accordance with the original design and referenced standards.
B. Discrepancies:
1. In the event of discrepancy, immediately notify the Owner’s Representative.
2. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.
3. Failure to notify the Owner’s Representative and give written notice of discrepancies shall constitute acceptance by the Contractor of existing conditions as fit and proper to receive his work.
3.02 ABBREVIATIONS AND SYMBOLS
A. Abbreviations and symbols on the Drawings are those most commonly used. Obtain clarification from the Owner’s Representative on any questionable items before bid.
3.03 GENERAL PIPING REQUIREMENTS
A. Size any section of pipe for which size is not indicated or any intermediate section erroneously shown undersized the same size as the largest pipe connecting to it. Sizes listed are nominal.
B. Cut pipe accurately to job measurements and install without springing or forcing, true to line and grade, generally square with building and/or structures and adequately supported to prevent undue stress on pipe, fittings and accessories.
C. Make changes of direction with manufactured fittings. Street ells, bushings, reducing flanges, close nipples or bending of pipe is not allowed.
D. Use great care to install piping in accordance with best practice. Plastic pipe shall be “snaked” in trenches to allow for thermal expansion.
E. All above grade, below grade and buried or imbedded PVC shall be installed using solvent weld fittings. Also, each and every fitting and pipe end shall be prepared with solvent primer.
Fittings shall be joined individually and with enough time between assembly of adjacent joints to allow them to seal solidly. After joining, an even ring of primer must be visible around the entire fitting. If any fittings are installed without visible primer, the fitting shall be removed and discarded and piping recut, rechamfered and joint made up again using a new fitting. All procedures, methods and techniques used to make up solvent weld joints shall be in strict accordance with manufacturer's recommendations.
F. Arrange pipe and hangers to allow for expansion, contraction and structural settlement. No pipe shall contact structure except penetrations as shown on the Drawings.
G. Provide dielectric connections between copper and dissimilar metals. In copper systems, For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 8
threaded piping including connections to equipment shall be brass pipe and fittings. Install dielectric connections in vertical sections of piping only.
H. Run pipe full size through shut-off valves, balancing valves, etc. Change pipe size within three (3) pipe diameters of final connection to control valves, fixtures and other equipment.
I. Provide unions or flanges at connections to equipment, on service side of valves and elsewhere as required to facilitate ease of maintenance.
J. Locate equipment shut-off valves as close to equipment as possible maintaining easy valve access.
K. Make all connections between domestic water systems and equipment or face piping with approved backflow prevention devices as required.
L. All PVC pipe exposed to direct sunlight shall be painted with two coats of Exterior Acrylic Semi-gloss Paint, Sherwin Williams or equal. Color to be selected by the Architect. Prior to painting the PVC pipes, the exterior of all PVC pipes shall be wiped with Methyl Ethyl Ketone, or an approved equal, to remove the glaze from the pipes.
M. The Main Drain pipe must run either level or uphill from the main drain sump, through the surge pit (if applicable) and then to the circulation pump.
3.04 TRENCH EXCAVATION AND BACKFILL
A. Excavation:
1. Excavate and backfill trenches as required for the Work of this Section. Conform to requirements of Section 13 11 01.
2. The Contractor shall perform all excavation of every description and of whatever materials encountered, to the depths indicated on the Drawings or as necessary. The Contractor shall dispose of the excavated materials not required or suitable for backfill as directed, and shall perform such grading as may be necessary to prevent surface water from flowing into the trenches. The Contractor shall provide adequate equipment for the removal of storm or subsurface waters, which may accumulate in the excavated areas.
B. Trenching:
1. Excavate trenches to lines and grades as indicated on the Drawings and with banks as nearly vertical as practicable.
2. Bottoms of trenches shall be accurately graded to provide uniform bearing on undisturbed soil for the entire length of each section of pipe.
3. The width of the trench at and below the top of the pipe shall be such that the clear space between the barrel of the pipe and the trench wall shall not exceed 8” on either side of the pipe. The width of trench above the top of pipe may be wider if necessary.
4. Over-depth excavations shall be filled with tamped sand to required grades.
5. Excavations of five (5) feet or more in depth shall be shored or supported in conformance with rules, and regulations of State and Federal Governments. Shoring For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 9
shall be constructed, maintained and removed in a manner to prevent caving of the excavation walls or other load on the pipe.
C. Backfilling:
1. Material for backfilling of pipes shall be approved granular material less than two (2) inches in diameter obtained from the excavation. No material of a perishable, spongy or otherwise unsuitable nature shall be used as backfill.
2. Backfilling of pipe trenches shall commence immediately after installation and testing to preclude damage to the installed pipe. Backfill around pipe shall be carefully placed so as not to displace or damage the pipe, and shall be carried up symmetrically on each side of the pipe to one foot above the top of the pipe. The material shall be carefully compacted or consolidated before additional backfill is placed.
3. Backfill above an elevation of one foot above the top of pipe in conformance with requirements of Section 131101. Material for balance of backfill shall be approved granular material less than six (6) inches in diameter taken from the excavation.
4. Unless otherwise indicated on the Drawings, all pipe shall have a minimum of eighteen (18) inches of cover.
3.05 GENERAL EQUIPMENT REQUIREMENTS
A. Position equipment to result in good appearance and easy access to all components for maintenance and repairs.
B. Install piping, flues, breeching and ducts so that they do not interfere with equipment access.
C. Install level, secure and out of moisture. Provide shims, anchors, support straps, angles, grouted bases, or other items as required to accomplish proper installation.
D. All screws, nuts, bolts and washers shall be galvanized, or stainless steel. After fabrication, hot-dip galvanize unfinished ferrous items for outdoor, below grade or other use subject to moisture.
E. Extend 1/2” Schedule 40 black steel pipe lubrication tubes from all hard to reach locations to front of equipment or to access points. Terminate with proper type of lubrication fitting.
3.06 VALVES AND STRAINERS
A. If no shut-off is indicated, provide ball valves at inlet connections and balance valves at outlet connections to fixtures and equipment. Provide proper valve trim for service intended.
B. Use no solder end valves unless noted otherwise; provide adapters in copper tubing systems.
C. Locate valves with stems above horizontal plane of pipe. In general, locate valves within six (6) feet of floor, out from under equipment, in accessible locations with adequate clearance around hand wheels or levers for easy operation.
D. Provide all valves, cocks and strainers, full pipe size unless indicated otherwise.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 10
E. Provide hand wheel operators on all valves 6” and larger, under 6” lever operators may be used.
F. Provide tool operated valve with stainless steel shaft extension and 'on deck' tool operation for surge chamber butterfly isolation valve.
3.07 IDENTIFICATION OF PIPING
A. Pipe identification and direction of flow shall be in compliance with ANSI/ASME A13.1. Identify each valve by a numbered brass tag with hole and brass chain mounted on valve stem or handle. Tag to be a minimum of 1” in diameter and numbers at least 1/4” high stamped into tag. Valves and plumbing lines shall be labeled clearly with the source or destination descriptions.
B. Install an identification chart in a plastic or glass framed enclosure, which schematically illustrates the proper operation of all piping systems and indicates number and location of all valves and control devices within the system.
C. The direction of flow for the recirculation equipment shall be labeled clearly with directional symbols such as arrows on all piping in the equipment area. Where the recirculation equipment for more than one pool is located on site, the equipment shall be marked as to which pool the system serves.
3.08 TESTS
A. Perform tests in presence of Owner’s Representative with no pressure loss or noticeable leaks.
B. Do not include valves and equipment in tests. Include connection to previously tested sections if systems are tested in sections.
C. Perform tests as follows:
System Test
Pressure
Test
Medium
Duration
Skimmer Lines and
Main Drain sump lines
20psig Water* 4 hours
Pool Piping 50 psig Water* 4 hours
Pool Main Drains 30 psig Water* 4 hours
Domestic Water 150 psig Water* 4 hours
*Never test PVC pipe or fittings with air or other gases, always use water.
3.09 PIPE MATERIAL APPLICATION
A. PVC Schedule 40: Below grade swimming pool piping and domestic water piping up to 12” line size; use standard solvent weld fittings.
B. PVC Schedule 80: Above grade swimming pool piping up to 12” line size; use solvent weld Schedule 80 or epoxy coated cast iron fittings.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 11
C. Type L Hard Copper: Above grade domestic water piping.
D. CPVC Schedule 80; Pool Heater Piping.
E. Schedule 40 Steel: Natural gas piping.
F. Pipe Insulation for Heat Exchanger, Coolant Lines, Cold Plunge, Cold Water Interior Piping:
Install pipe insulation on all cold water PVC schedule 80 cold plunge circulation piping located in the pool mechanical room and exposed above grade piping. Provide NBR/PVC closed-cell pipe insulation, pre-slit, pre-glued with overlap, ¾” wall thickness with a temperature range between -70° to 220°F for schedule 80 PVC pipe.
G. Pipe Insulation for Heat Exchanger, Coolant Lines, Cold Plunge or Cold Water Exterior Piping:
Install pipe insulation on all cold water PVC schedule 80 cold plunge circulation piping located outside pool mechanical room and exposed above grade piping. Provide aluminum jacketed NBR/PVC closed-cell pipe insulation with a temperature range between -70° to 220°F for schedule 80 PVC pipe.
3.10 CUTTING AND DRILLING
A. Cutting or drilling necessary for installation of Work of this Section shall be done only with approval of Owner’s Representative.
3.11 CLOSING-IN OF UNINSPECTED WORK
A. Do not cover or enclose Work before testing and inspection. Re-open Work prematurely closed and restore all Work damaged.
3.12 QUIETNESS
A. Quietness is a requirement. Eliminate noise, other than that caused by specified equipment operating at optimum conditions, as directed by Owner’s Representative.
3.13 FLUSHING OF LINES
A. Flush or blow out pipes free from foreign substances before installing valves, stops or making final connections. Clean piping systems of dirt and dust prior to initial start-up.
B. Just prior to plastering the pool, under the observations of the IOR, the pool mechanical system shall be flushed using the pool circulation pump. Circulate water through the mechanical system until the effluent water from the pool return heads runs clean.
3.14 CLEAN-UP
A. After all Work has been tested and approved, the Swimming Pool Subcontractor shall thoroughly clean all parts of the equipment installations, including all pool pipe and fittings in the pool mechanical room. Exposed parts shall be cleaned of cement, plaster and other materials and all grease and oil spots removed with solvent.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL MECHANICAL
13 11 07 - 12
B. The Swimming Pool Subcontractor shall remove debris from the Project site. Cartons, boxes, packing crates and excess materials not used, occasioned by this work shall be disposed of to the satisfaction of the Owner’s Representative.
C. If the above requirements of clean up are not performed to the satisfaction of the Owner’s Representative, the Owner reserves the right to order the work done, the cost of which shall be borne by the Swimming Pool Subcontractor.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 1
SECTION 13 11 08
SWIMMING POOL ELECTRICAL
PART 1 GENERAL
1.01 WORK INCLUDED
A. Provide labor, materials and equipment as required to install the swimming pool electrical system including but not limited to:
1. A complete and operable system of service equipment, switchboards, panelboards, conduits, switches, time clocks and wiring for power and lighting, motor control centers.
2. Junction and/or pull boxes, conduits, disconnects, starters, contactors, wiring and connection of all motors and mechanical equipment, including connection and wiring of line voltage controls associated with the mechanical systems.
3. Swimming pool underwater lighting systems.
4. Swimming pool timing system outlets and scoreboard.
5. Complete grounding system as required and shown on the Drawings.
6. Complete equipotential bonding system as required and shown on the Drawings and in accordance with National Electric Code Article 680.
7. Adjusting and preliminary operation of the completed electrical system as described in Article 3.06, A of this Section.
8. Cleaning of all completed Work and installation adjustment of all trim and decorative items.
1.02 QUALITY ASSURANCE
A. Qualifications of Workers:
1. The entity performing the work of this Section shall have been successfully engaged in the respective trade for at least five (5) years immediately prior to commencement of the Work.
2. For actual construction operations, use only trained and experienced workers with a minimum of three (3) years experience with the materials and methods specified.
3. Provide at least one person who shall be present at all times during execution of the work of this Section, with a minimum of five (5) years experience with the type of materials being installed, the referenced standards, and who shall direct all Work performed under this Section.
B. Ordinances and Codes: Materials and construction shall conform with all applicable code requirements, including:
1. National Electrical Code, latest edition; Electrical Safety Orders of the State of California; Department of Industrial Relations; regulations of the State Fire Marshal; rules and regulations of the Board of Underwriters of the Pacific, UL 50, 50E and NEMA 250 rating.
2. Chapter 31 of California Building Code, 2022 edition.
C. Verification of Conditions:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 2
1. The locations shown on the Drawings are diagrammatic only and the exact finish location of equipment and materials cannot be indicated. Therefore, locations of all Work and equipment shall be verified to avoid interferences, preserve head room and keep openings and passageways clear. Changes shall be made in locations of equipment and materials which may be necessary to accomplish these purposes.
D. Preliminary Operations and Testing:
1. Motor driven equipment shall be tested for correct rotation and completion of all connections.
1.03 SUBMITTALS AND SUBSTITUTIONS
A. Provide submittals in conformance with the requirements of Section 01 33 00. Requests for substitutions shall conform with requirements of Article 1.10.A of Section 13 11 00.
B. Required submittals include:
1. Conduit and Fittings as specified in Article 2.02 of this Section.
2. Panelboards as specified in Article 2.08 of this Section.
3. Circuit Breakers as specified in Article 2.09 of this Section.
4. Motor Starters as specified in Article 2.12 and 2.13 of this Section.
5. Fuses as specified in Article 2.15 of this Section.
6. Time Clocks as specified in Article 2.16 of this Section.
7. Ground Fault Circuit Interrupters as specified in Article 2.17 of this Section.
8. NEMA Type 4x corrosion resistant UL 50, 50E & NEMA 250 rating for enclosures, cabinets and boxes as specified in Article 2.11 & 2.18 of this Section.
C. Submit proof of qualifications as specified in Article 1.02.A of this Section.
1.04 PRODUCT HANDLING
A. Delivery: Deliver all materials to the Project Site in the manufacturer’s original unopened containers with all labels intact and legible.
B. Storage: Store all materials under cover in a manner to prevent damage and contamination, and store only the specified materials at the Project site.
C. Protection: Use all means necessary to protect swimming pool electrical materials before, during, and after installation and to protect the installed Work specified in other Sections.
PART 2 PRODUCTS
2.01 MATERIALS, GENERAL
A. Materials shall be new, in unbroken packages and bear the U.L. label of approval.
B. Equipment of one type shall be by same manufacturer. One type of equipment for For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 3
classifications such as:
1. Switchboards, panels, buss duct, disconnect switches and allied items.
2. Conduit.
3. Wire.
4. Conduit fittings.
5. Fixtures of the same general type.
6. Wiring devices.
2.02 CONDUIT AND FITTINGS
A. Conduit within or under buildings or where exposed outdoors shall be rigid metal threaded, hot dipped galvanized, or U.L. approved plastic except where noted otherwise on the Drawings.
Metallic conduit shall be of the same metal between outlets or terminals.
B. Use flexible metallic conduit only for short connections of motors and where specifically called for on Drawings. Maximum length shall be 40". Use only liquid tight flexible metal conduit.
Install an unbroken #12 AWG insulated copper grounding conductor in each liquid tight flexible conduit with permanent connection at motor junction box and service panel ground.
C. Protect, before installation, metallic conduit runs in all slabs laid on grade or in contact with the earth or exposed in damp locations, with two (2) heavy coats of asphaltum rust-resisting compound.
D. Encase conduits 2-1/2" or larger run underground, outside, or under buildings, in concrete envelopes a minimum of 3" thick, except as indicated otherwise on Drawings or stubouts.
Conduits 2 and smaller laid 18" below finish surface in soil.
E. Low voltage runs underground outside buildings, 1-1/4" or smaller, may be G.I. or sherardized steel conduit, with machine applied wrapping equal to double wrap or Scotch-Wrap #50 tape, half lapped and quadrupled at joints in lieu of concrete encasement.
F. Service conduits through foundations or concrete members shall run through metal sleeves with adequate clearances for full movement of the conduit. Do not run conduits through footings.
G. Secure conduits run exposed on surfaces with one hole heavy-duty straps or fasten with matching fittings to inserts or trapezes, parallel to building walls and ceilings.
H. Cap all conduit or duct stub-outs with standard factory caps; except cap threaded steel conduit with B.I. water pipe caps in outdoor locations.
I. Use conduit fittings as manufactured by Crouse-Hinds Company, Appleton Electric Co., or approved equal.
J. Employ U.L. liquid tight fittings for use with liquid tight flexible metal conduit.
K. Use unions as manufactured by Appleton, O-Z/Gedney, or approved equal. The use of running threads will not be permitted.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 4
L. Exposed conduit and fittings in chemical rooms shall be nonmetallic rigid polyvinyl chloride, corrosion resistant rated suitable for installation in corrosive environments and in accordance with the latest NEC requirements.
2.03 EQUIPOTENTIAL BONDING/GROUNDING
A. Bond together and ground to a common ground at a single point all metallic conduit, piping systems, pool reinforcing steel, metal parts of ladders, lifeguard stands, handrails and their supports and the like. The solid copper bonding conductor shall not be smaller than #8 copper.
Provide equipotential bonding per Article 680 of the National Electrical Code. In instances where no deck reinforcement is present, Contractor shall provide a minimum of three feet of equipotential bonding material in conformance with Code. All bonding items shall be inspected prior to concrete pour.
2.04 WIRING CONNECTIONS
A. Make connections without strain on conductors, allowing the conductors to take a natural position after connections or taps are made. Include all strand of wire in making the connection.
B. Make connections for wiring by one of the following means:
1. Make all taps or connections to conductors with compression type connectors except those smaller than #8 B&S gauge may have soldered connections. Solderless connections for #10 AWG or smaller may be used and shall be "Scotchlok", Buchanan, or approved equal. For #8 AWG or larger, they shall be T&B "LockTite", Burndy "Versitaps", or approved equal.
2. All cable or conductor terminal lugs shall be Burndy "Quicklug", Ilsco, or approved equal.
Two piece stamped lugs and solder lugs will not be approved.
3. Paint taped splices in damp or outdoor locations with two (2) coats of insulating paint.
4. Tag all branch circuit wires with circuit number at the panelboard and at each point of use with linen or plastic tags.
2.05 CONDUCTORS
A. Copper RHW or THW. Do not make splices between boxes.
2.06 COLOR CODING
A. Neutrals (identified conductors shall be white).
B. Phase conductors shall be red for phase B; blue for phase C.
C. Green shall be used for mechanical equipment and receptacle grounds only.
2.07 MOTOR WIRING
A. Make final connections to motors with the required AWG (Minimum #12), Flamenol machine For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 5
tool wire, 19 strand. Control wiring for equipment shall be Flamenol machine tool wire, 19 strand of required AWG. Provide corrosion resistant junction boxes at each item of equipment to change from standard building wiring to machine tool wire.
B. Phase motors as proper in direction of rotation.
2.08 PANELBOARDS
A. Panelboards shall be flush or surface mounting as indicated with circuit breakers as shown on panel schedule, hinged lockable doors, index card holders and proper bussing.
B. Where indicated on the drawings, panelboards shall be furnished with subfeed breakers and/or lugs, split bussing, contractors, time switches, relays, etc., as required.
C. All panelboards shall be keyed alike.
D. All panelboard enclosures shall be corrosion resistant rated NEMA 4X in accordance with the latest NEC requirements.
E. Furnish corrosion resistant panelboard enclosures and terminal cabinets with Yale 46515 flush locks and LL806 keys except where indicated otherwise herein. Fasten the trim to panel boards and terminal cabinet by means of concealed, bolted or screwed fasteners accessible only when the door is open.
F. Panelboards 208/120 volt, three phase, 4 wire, S/N or 120/240 volt, single phase, 3 wire, S/N.
Panelboard types as manufactured by:
Westinghouse Type B10B
General Electric Type NLAB
Square D Type NQOB
G. Panelboards for 480/277 volt, three panes, 4 wire, S/N.
Panelboard types as manufactured by:
Westinghouse Type Pow-R-Line 2
General Electric Type AE
Square D Type NEHB
Sylvania Type NH1B
I.T.E. Type Approved Equal
H. Panelboard for bussing sizes thru 400 amp shall be 20" wide surface mounted type. Recess mounted type shall have a 20" wide (maximum) recess metal enclosure with trim plate cover extending 1" on all sides of enclosure. Depth shall be 5-3/4" nominal. Height of panel as required for devices.
I. Provide 6" additional gutter space in all panels where double lugs are required, or where cable size exceeds bus size. Minimum bottom gutter space shall be 6" high. 12" additional gutter space may be required for aluminum feeders where used.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 6
J. Panelboards shown on the drawings with relays, time clocks or other control devices shall have a separate metal barriered compartment mounted above panel with separate hinged locking door to match panelboard. Provide mounting sub-base in cabinet for control devices and wiring terminal strips.
K. Panelboard shall have a circuit index card holder removable type, with clear plastic cover. Index card shall have numbers imprinted to match circuit breaker numbers.
2.09 CIRCUIT BREAKERS
A. Breakers shall have a minimum short circuit interrupting rating of 10,000A symmetrical for panelboard voltage thru 240 volt and 14000A for panelboards thru 600 volts or as specified on the drawings. In no case shall the interrupting rating be less than the bus withstand rating unless noted otherwise on the drawings.
B. Circuit breakers as manufactured by the following companies only are acceptable:
1. General Electric Company
2. Square D Company
3. Westinghouse Company
4. I.T.E. Company
C. Circuit breakers shall be arranged in the panels so that the breakers of the proper trip settings and numbers correspond to the numbering in the panel schedules on the drawings. Circuit numbers of breakers shall be black-on-white micarta tabs or other previously approved method.
Circuit number tabs which can readily be changed from front of panel will not be accepted.
Circuit number tabs shall not be attached to or be a part of the breaker.
D. Where two or three pole breakers occur in the panels, they shall be common trip units. Single pole breakers with tie-bar between handles will not be accepted.
E. All circuit breakers shall be padlockable in the "off" position. Locking facilities shall be riveted or mechanically attached to the circuit breaker (submit sample for approval). Other means of attachment shall not be accepted without prior written approval of Architect.
F. Where branch circuit breakers supply the power to motors and signal systems, the breakers shall be furnished with lockout clips, mounted in the "on" position. The breakers shall be able to trip automatically with lockout clips in place.
G. Panelboard circuit breakers shall be bolt-on type.
2.10 BUSSING
A. Bussing shall be rectangular cross section copper, or full length silver or tin-plated aluminum.
B. Bussing shall be braces to withstand symmetrical short circuit ratings as follows or as noted on drawings. In no case shall bus short circuit bracing be less than specified circuit breakers.
C. Each panelboard shall be equipped with a ground bus secured to the interior of the enclosure.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 7
The bus shall have a separate lug for each ground conductor. No more than one conductor shall be installed per lug.
2.11 POOL MECHANICAL EQUIPMENT ENCLOSURES, TERMINAL CABINETS & MISC CABINETS A. All pool mechanical equipment enclosures, terminal cabinets and miscellaneous cabinets in the pool mechanical room or chemical storage rooms shall be corrosion resistant rated in accordance with the latest NEC requirements. Enclosures and all cabinets shall be flush mounted (except where noted a surface) of the size indicated on the drawings, and complete with hinged lockable doors and the number of 2-way screw terminals required for termination of all conductors.
Terminal cabinet locks to operated form same key used for panelboards. The trim to terminal cabinets shall be fastened by means of concealed bolted or screwed fasteners accessible behind door to terminal cabinets. Terminal cabinets shall have 5/8" plywood backing.
B. Provide engraved nameplate on each enclosure and cabinet indicating its designation and system (i.e., Swimming Pool - Panel ‘SP’).
2.12 MOTOR CONTROL INDIVIDUAL STARTERS
A. Manual Motor Starters:
1. Provide flush or surface mounting manual motor starters with number of poles and size of thermal overload heaters as required for the motor being controlled (equipped with overload heaters, one for each motor lead). Back boxes shall be supplied with all flush mounting starters whether they are toggle type requiring only a 4" square outlet box or the larger type requiring a special box and cover designed to accept the particular unit. All box types shall be corrosion resistant rated in accordance with the latest NEC requirements.
2. Unless otherwise noted on the drawings, all manual starters for single phase motors, smaller than 1 h.p., shall be the compact toggle type. Manual starters for all single phase motors, 1 to 5 h.p., and all three phase motors up to 5 h.p. shall be the heavy duty type.
3. Where manual motor starter is shown with pilot light, the pilot light shall be installed in a separate outlet box adjacent to the starter outlet, and engraved nameplate in indicate function of pilot light.
4. The following motor starters as manufactured by:
Manufacturer Single Phase
1HP and Below
Others
Arrow Hart Type RL Type LL
General Electric CR 101 Class CR 1062
I.T.E. Class C10, C11 or C12 Class C20
Square D Company Class 2510, Type A Class 2510, Type B & C Westinghouse Type MS Type A100
Allen Bradley Approved Equal Approved Equal.
B. Individual Magnetic Motor Starters:
1. Magnetic motor starters shall be A.C. line voltage, across-the-line units in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
2. All starters located outside of a building whether or not indicated shall be W.P.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 8
(weatherproof), and all starters noted W.P. shall be furnished in a corrosion resistant rated stainless steel enclosure in accordance with the latest NEC requirements.
3. Starter shall be horsepower rated for the motor controlled, and shall be equipped with properly sized overload elements. Every pole shall be with overload element.
4. Verify the exact motor current and voltage characteristics with the Contractor supplying the motor before installation of a starter.
5. Each starter shall be equipped with "Hand-Off-Auto" switch or stop-start pushbutton as required.
6. Coils shall be designed to operate on voltage indicated on control diagrams and have builtin-under the voltage release for coil circuit to drop motor starter off the line when the line voltage drops below normal operating voltage.
7. The coil control circuit shall be independently fused, sized to protect coil.
8. Starters to be equipped with running pilot light indication with a "Push-to-Test" feature.
9. Magnetic starters shall have a minimum of two auxiliary contacts. Additional auxiliary contacts shall be provided as required to comply with the requirements of the wiring diagrams on the electrical and mechanical drawings and the description of the function in the Mechanical Section of the Specifications.
10. Starters shall comply with NEMA standards, size and horsepower ratings as indicated on drawings.
11. The following types of magnetic motor starters as manufactured by:
Manufacture Type
General Electric Class CR 106
I.T.E. Class A20
Square D Company Class 8536
Westinghouse Type A200 (Size 4 Max.) or
Class II-200 (Sizes 5-8)
2.13 INDIVIDUAL COMBINATION MOTOR STARTERS
A. Combination starter shall incorporate fused disconnect switch and individual magnetic motor starter. Combination starters shall be mounted in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
B. Starters shall comply with NEMA standards, size and horsepower ratings as indicated on drawings General Electric, Square D, Westinghouse or I.T.E.
B. The disconnect handle used on combination starters shall control the disconnect device with the door opened or closed. The disconnect handle shall be clearly marked as to whether the disconnect device is "ON" or "OFF", and shall include a two-color handle grip, the black side visible in the "OFF" position indicating a safe condition, and the red side visible in the "ON" position indicating an unsafe or danger condition.
C. All starters used in combination starters shall be manufactured in accordance with the latest published NEMA standards, sizes, and horsepower ratings. These starters shall be furnished with three melting alloy type thermal overload relays.
D. Thermal units shall be of one-piece construction and interchangeable. The starter shall be inoperative if a thermal unit is removed.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 9
2.14 MOTOR CONTROL CENTER, INTERLOCKS AND CONTROL DEVICES A. Refer to mechanical and plumbing drawings and specifications and provide all control devices including timeswitches, relays and interconnection of starters as required.
B. Mount all relays and timeswitches in a separate compartment in motor control center unless otherwise indicated.
C. Whether shown on mechanical and plumbing drawings or control center schedules or not, where motors are controlled by external devices (i.e., thermostats, relays, float or pressure switches, etc.) or interlocked with other motors, each motor starter to be equipped with a "Hand-Off-Auto" selector switch in starter cover. Other starters equipped with a "Start' Stop" pushbutton station in starter cover. The Contractor shall be responsible to submit a complete and detailed set of shop drawings, electrical schematic design along with electrical component cut sheets from the MCC panel or the interlock control device manufacturer. RSD Total Control: Allan Pearson 949-380- 7878, South Coast Controls: Anthony Ellis 714-998-5656, H2O Integration Controls, Mike Macri, 253-244-1576 or approved equal.
2.15 FUSES
A. Fuses shall be dual element, current limiting type, U.L. Class RK5 unless otherwise indicated on the drawings. Provide one spare set of fuses of each size and type in each motor control center.
2.16 TIME CLOCKS
A. Time clocks shall be provided for all underwater lighting systems and swimming pool circulation pumps not controlled by filter microprocessors.
B. Contacts shall have a minimum rating of 40 amperes at 277V.
C. Timing motor shall be heavy duty synchronous, self starting, high torque type, and shall be rated at 120, 208, 240, 277 volt 60 Hz.
D. Motor shall operate normally at temperature range of -60 degrees Fahrenheit to +120 degrees Fahrenheit.
E. Dial shall be 3" diameter, clearly calibrated with day/night zones and 24 hour rotation, with gear to provide one revolution yearly which automatically varies the on/off settings each day according to seasonal changes. Day and month of the year shall show clearly through calendar window on the dial.
F. Time clocks shall be equipped with 7-spoke omitting wheel marked with days of the week.
G. Time clocks shall be housed in a corrosion resistant rated enclosure in accordance with the latest NEC requirements.
H. Acceptable manufacturers are Intermatic, Tork, Paragon, or approved equal.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 10
2.17 GROUND FAULT CIRCUIT INTERRUPTERS
A. Minimum rating shall be 20 amperes, 125V, 5 milliampere trip setting, Class A per UL943.
B. Manufacturer to be Crouse-Hinds, Leviton, or approved equal.
2.18 BOXES
A. Boxes shall be of the size required by ordinances or larger, must be corrosion resistant in accordance with the latest NEC requirements where concealed or exposed on ceilings or walls.
B. Outlets to be surface where wiring is exposed and flush in areas where conduit is concealed.
B. Provide surface outlets with proper corrosion resistant surface covers. Box and cover shall be deep enough to provide at least 1/4" clearance between back of device and back of box.
Where box contains more than one device, use a corrosion resistant rated gang box with proper cover in accordance with the latest NEC requirements. Surface outlet boxes shall be of the threaded hub type wherever below 8'0".
C. If necessary for cable installation, additional pull boxes or junction boxes may be installed in accessible locations. Exposed pull boxes and junction boxes shall be corrosion resistant rated in accordance with the latest NEC requirements.
E. Where exposed to weather pull boxes larger than outlet boxes are required, galvanized code gauge sheet steel boxes may be used with covers attached by brass machine screws may be used. Boxes exposed to the weather shall be approved for the purpose, and conduit entrances shall be on the bottom made by means of an interchangeable hub with gasket and adapter nut. Pull boxes not shown on Drawings may be added only after approval of size and location is obtained.
F. For outlets exposed to weather or where noted, cast outlet boxes shall be Crouse-Hinds, Appleton, or approved equal. Boxes shall have proper number and size hubs. Device plates, covers, adapters and boxes shall be as manufactured by Crouse-Hinds, Appleton, or approved equal.
G. Exposed junction boxes, outlet boxes and pull boxes for pool chemical rooms shall be non - metallic suitable for a corrosive environment and in accordance with the latest NEC requirements.
2.19 IDENTIFICATION MARKINGS
A. Plainly mark all motor and electrical appliance control equipment indicating the equipment controlled with engraved metal tags.
B. Provide laminated plastic nameplates on panelboards on the outside of the door at the top indicating panel designation and feeder source.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 11
C. Provide laminated plastic nameplates on distribution switchboards and motor control centers at the top center indicating panel designation and feeder source.
D. Identify each distribution switchboard and motor control center circuit breaker with a laminated plastic nameplate indicating its' use.
E. Type panelboard directories on the forms provided with the equipment, indicating the use of each branch circuit breaker.
F. Fasten all laminated plastic nameplates to surfaces with two (2) or more screws.
PART 3 EXECUTION
3.01 INSPECTION
A. Verify conditions at the Project site before submitting bid. Be responsible for providing all necessary wiring for the new electrical systems. Wherever wiring is being disrupted due to remodeling or changes, reconnect existing and provide new wiring circuits to accomplish a fully operable system at no additional cost to the Owner.
3.02 COORDINATION
A. The Drawings are essentially diagrammatic and indicate the desired location, size, routes, connection points, etc., and are to be followed as closely as possible. Proper judgment must be exercised in executing the Work so as to provide the best possible installation in the available space and to overcome difficulties, limitations or interference wherever encountered.
Be responsible for the correct placement of this Work, the proper location and connection in relation to Work of other trades, for determining the exact location of all conduits, outlets and equipment, and for installing the conduits in such a manner as to conform to the structure, avoid obstruction, preserve headroom and keep openings and passageways clear. Particular attention is directed to the close coordination required on exposed Work. Locations shown on Architectural or Mechanical Drawings if different than those shown on Electrical Drawings should be communicated to the Owner’s Representative in writing for clarification.
3.03 INSTALLATION
A. Trenching and Backfill: Conform with requirements of Section 131101. Provide minimum cover as required by Code.
B. Conduit Installation:
1. Conduit and metallic raceway systems shall be mechanically and electrically continuous from sources of current to all outlets in a manner to provide a continuous grounding path. Close ends of conduit during construction to prevent entrance of dirt or moisture.
2. Securely fasten conduit to the building construction within three feet of each outlet and within every ten feet thereafter. Secure it to boxes, cabinets, pull boxes, terminals with two locknuts and ends equipped with bushings or a terminal fitting. Cut square with ends For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 6, 2026
SWIMMING POOL ELECTRICAL
13 11 08 - 12
carefully reamed.
3. Make bends or elbows so that the conduit will not be injured or flattened.
4. Use insulated metallic bushings in all places where bushings are required.
5. Run exposed conduits level or plumb and parallel to the construction members of the building. No cutting across or diagonal runs will be permitted. Neatly surmount structural obstructions encountered on conduit runs by the use of fittings or pull boxes.
6. Identify feeder conduits by stamped metal tags secured to exposed section of conduit in main or sub-panels.
7. Make up all threaded conduit joints gas and watertight with conductive sealer except conduit above ground in dry indoor locations.
8. Rigidly support all boxes independently of the conduit system.
C. Connections to Equipment:
1. Fully connect, in an approved manner, all electrical outlets, apparatus, motors, equipment, fixtures, wiring devices and appliances whether they are installed under the Electrical Contract or not, which require electrical connections, to the corresponding electrical system outlet.
2. Where the Work of this Section requires connections to be made to equipment that is furnished and set-in-place under other Sections, obtain such roughing-in dimensions from the manufacturer or supplier of each item as required and assume full responsibility for the installation of the connections thereto.
3.04 ADJUSTMENT AND CLEAN-UP
A. Preliminary Operation: Should the Owner’s Representative deem it necessary to operate the electrical installation or any part thereof prior to Substantial Completion of the Work, consent to such preliminary operation and supervise conduction of same. Subcontractor shall pay all costs occasioned by such operation. Preliminary operation shall not be construed as an acceptance of any Work installed under this Contract.
B. Clean-up: Upon completion of the Work of this Section, immediately remove all swimming pool electrical materials, debris and rubbish occasioned by this Work to the approval of the Owner’s Representative.
END OF SECTION
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 1
SECTION 23 05 29
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Thermal-hanger shield inserts.
3. Fastener systems.
4. Equipment supports.
B. Related Requirements:
1. Section 230548 "Vibration and Seismic Controls for HVAC"] [Section 230548.13 "Vibration Controls for HVAC" for vibration isolation devices.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
1.4 QUALITY ASSURANCE
A. Structural-Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code, Section IX.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance: Hangers and supports for HVAC piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7
1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.
2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 2
3. Design seismic-restraint hangers and supports for piping and equipment
2.2 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Galvanized Metallic Coatings: Pregalvanized, hot-dip galvanized, or electro-galvanized.
3. Nonmetallic Coatings: Plastic coated, or epoxy powder-coated.
4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel B. Stainless Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel C. Copper Pipe and Tube Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-plated steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel
2.3 THERMAL-HANGER SHIELD INSERTS
A. Insulation-Insert Material for Cold Piping: ASTM C552, Type II cellular glass with 100-psi or ASTM C591, Type VI, Grade 1 polyisocyanurate with 125-psi minimum compressive strength and vapor barrier.
B. Insulation-Insert Material for Hot Piping: Water-repellent-treated, ASTM C533, Type I calcium silicate with 100-psi ASTM C552, Type II cellular glass with 100-psi or ASTM C591, Type VI, Grade 1 polyisocyanurate with 125-psi minimum compressive strength.
C. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
D. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
E. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.4 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
B. Mechanical-Expansion Anchors: Insert-wedge-type, zinc-coated steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 3
2.5 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbonsteel shapes.
2.6 MATERIALS
A. Aluminum: ASTM B221
B. Carbon Steel: ASTM A1011/A1011M.
C. Structural Steel: ASTM A36/A36M, carbon-steel plates, shapes, and bars; black and galvanized.
D. Stainless Steel: ASTM A240/A240M.
E. Grout: ASTM C1107/C1107M, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Nonstaining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
PART 3 - EXECUTION
3.1 APPLICATION
A. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping materials and installation for penetrations through fire-rated walls, ceilings, and assemblies.
B. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb
3.2 INSTALLATION OF HANGERS AND SUPPORTS
A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
B. Fiberglass Pipe-Hanger Installation: Comply with applicable portions of MSS SP-58. Install hangers and attachments as required to properly support piping from building structure.
C. Framing System Installation: Metal. Arrange for grouping of parallel runs of piping, and support together on field-assembled strut systems.
D. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
E. Fastener System Installation:
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 4
2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
F. Pipe Stand Installation:
1. Curb-Mounted-Type Pipe Stands: Assemble components or fabricate pipe stand and mount on permanent, stationary roof curb. See Section 077200 "Roof Accessories" for curbs.
G. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
I. Install lateral bracing with pipe hangers and supports to prevent swaying.
J. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.
K. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
M. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation. a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches long and 0.048 inch thick. b. NPS 4 (DN 100): 12 inches long and 0.06 inch thick.
5. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 5
3.3 INSTALLATION OF EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.4 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for equipment supports.
B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.
3.5 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches
3.6 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.
1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils B. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A780/A780M.
3.7 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 6
B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use carbon-steel pipe hangers and supports and attachments for general service applications.
F. Use stainless steel pipe hangers and fiberglass pipe hangers and fiberglass strut systems and stainless steel or corrosion-resistant attachments for hostile environment applications.
G. Use copper-plated pipe hangers and copper or stainless steel attachments for copper piping and tubing.
H. Use padded hangers for piping that is subject to scratching.
I. Use thermal-hanger shield inserts for insulated piping and tubing.
J. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30
2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F, pipes NPS 4 to NPS 24, requiring up to 4 inches of insulation.
3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.
4. Steel Pipe Clamps (MSS Type 4): For suspension of cold and hot pipes NPS 1/2 to NPS 24 if little or no insulation is required.
5. Pipe Hangers (MSS Type 5): For suspension of pipes NPS 1/2 to NPS 4, to allow off-center closure for hanger installation before pipe erection.
6. Adjustable, Swivel Split- or Solid-Ring Hangers (MSS Type 6): For suspension of noninsulated, stationary pipes NPS 3/4 to NPS 8.
7. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.
8. Adjustable Band Hangers (MSS Type 9): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.
9. Adjustable, Swivel-Ring Band Hangers (MSS Type 10): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.
10. Split Pipe Ring with or without Turnbuckle Hangers (MSS Type 11): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 8.
11. Extension Hinged or Two-Bolt Split Pipe Clamps (MSS Type 12): For suspension of noninsulated, stationary pipes NPS 3/8 to NPS 3.
12. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30.
13. Clips (MSS Type 26): For support of insulated pipes not subject to expansion or contraction.
14. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36, with steelpipe base stanchion support and cast-iron floor flange or carbon-steel plate.
15. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36, with steelpipe base stanchion support and cast-iron floor flange or carbon-steel plate, and with Ubolt to retain pipe.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 7
16. Adjustable Pipe Saddle Supports (MSS Type 38): For stanchion-type support for pipes NPS 2-1/2 to NPS 36 if vertical adjustment is required, with steel-pipe base stanchion support and cast-iron floor flange.
17. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30, from two rods if longitudinal movement caused by expansion and contraction might occur.
18. Adjustable Roller Hangers (MSS Type 43): For suspension of pipes NPS 2-1/2 to NPS 24, from single rod if horizontal movement caused by expansion and contraction might occur.
19. Complete Pipe Rolls (MSS Type 44): For support of pipes NPS 2 to NPS 42 if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is unnecessary.
20. Pipe Roll and Plate Units (MSS Type 45): For support of pipes NPS 2 to NPS 24 if small horizontal movement caused by expansion and contraction might occur and vertical adjustment is unnecessary.
21. Adjustable Pipe Roll and Base Units (MSS Type 46): For support of pipes NPS 2 to NPS 30 if vertical and lateral adjustment during installation might be required in addition to expansion and contraction.
K. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to NPS 24.
2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 if longer ends are required for riser clamps.
L. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
5. Steel Weldless Eye Nuts (MSS Type 17): For 120 to 450 deg F piping installations.
M. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.
6. C-Clamps (MSS Type 23): For structural shapes.
7. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.
8. Side-Beam Clamps (MSS Type 27): For bottom of steel I-beams.
9. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel Ibeams for heavy loads.
10. Linked-Steel Clamps with Eye Nuts (MSS Type 29): For attaching to bottom of steel Ibeams for heavy loads, with link extensions.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 8
11. Malleable-Beam Clamps with Extension Pieces (MSS Type 30): For attaching to structural steel.
12. Welded-Steel Brackets: For support of pipes from below or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb
b. Medium (MSS Type 32): 1500 lb
c. Heavy (MSS Type 33): 3000 lb
13. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams.
14. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.
15. Horizontal Travelers (MSS Type 58): For supporting piping systems subject to linear horizontal movement where headroom is limited.
N. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.
O. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Restraint-Control Devices (MSS Type 47): Where indicated to control piping movement.
2. Spring Cushions (MSS Type 48): For light loads if vertical movement does not exceed 1- 1/4 inches
3. Spring-Cushion Roll Hangers (MSS Type 49): For equipping Type 41, roll hanger with springs.
4. Spring Sway Braces (MSS Type 50): To retard sway, shock, vibration, or thermal expansion in piping systems.
5. Variable-Spring Hangers (MSS Type 51): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from hanger.
6. Variable-Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from base support.
7. Variable-Spring Trapeze Hangers (MSS Type 53): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from trapeze support.
8. Constant Supports: For critical piping stress and if necessary to avoid transfer of stress from one support to another support, critical terminal, or connected equipment. Include auxiliary stops for erection, hydrostatic test, and load-adjustment capability. These supports include the following types:
a. Horizontal (MSS Type 54): Mounted horizontally.
b. Vertical (MSS Type 55): Mounted vertically.
c. Trapeze (MSS Type 56): Two vertical-type supports and one trapeze member.
P. Comply with MSS SP-58 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.
Q. Use powder-actuated fasteners or mechanical-expansion anchors instead of building attachments where required in concrete construction.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230529 - 9
END OF SECTION 230529
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 1
SECTION 23 05 48
VIBRATION AND SEISMIC CONTROLS FOR HVAC
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Elastomeric isolation pads.
2. Elastomeric isolation mounts.
3. Elastomeric hangers.
4. Post-installed concrete anchors.
5. Concrete inserts.
B. Related Requirements:
1. Section 220548 "Vibration and Seismic Controls for Plumbing Piping and Equipment" for devices for plumbing equipment and systems.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Field quality-control reports.
1.4 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel in accordance with AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Seismic-Restraint Device Load Ratings: Devices to be tested and rated in accordance with applicable code requirements and authorities having jurisdiction. Devices to be listed by a nationally recognized third party that requires periodic follow-up inspections and has a listing directory available to the public. Provide third-party listing by one or more of the following: an agency acceptable to authorities having jurisdiction
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Consequential Damage: Provide additional seismic restraints for suspended HVAC components or anchorage of floor-, roof-, or wall-mounted HVAC components as indicated in ASCE/SEI For
7-05
Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 2
so that failure of a non-essential or essential HVAC component will not cause failure of any other essential architectural, mechanical, or electrical building component.
B. Fire/Smoke Resistance: Seismic-restraint devices that are not constructed of ferrous metals must have a maximum flame-spread index of 25 and maximum smoke-developed index of 50 when tested by an NRTL in accordance with ASTM E84 or UL 723, and be so labeled.
C. Component Supports:
1. Load ratings, features, and applications of all reinforcement components must be based on testing standards of a nationally recognized testing agency.
2. All component support attachments must comply with force and displacement resistance requirements of ASCE 7-05 Section 13.6
2.2 ELASTOMERIC ISOLATION PADS
A. Elastomeric Isolation Pads:
1. Fabrication: Single or multiple layers of sufficient durometer stiffness for uniform loading over pad area.
2. Size: Factory or field cut to match requirements of supported equipment.
3. Pad Material: Oil and water resistant with elastomeric properties. Neoprene rubber, silicone rubber, or other elastomeric material.
4. Surface Pattern: Smooth, ribbed, or waffle pattern.
2.3 ELASTOMERIC ISOLATION MOUNTS
A. Double-Deflection, Elastomeric Isolation Mounts:
1. Mounting Plates:
a. Top Plate: Encapsulated steel load transfer top plates, factory drilled and threaded with threaded studs or bolt
b. Baseplate: Encapsulated steel bottom plates with holes provided for anchoring to support structure.
2. Elastomeric Material: Molded, oil- and water-resistant neoprene rubber, silicone rubber, or other elastomeric material.
2.4 RESTRAINED ELASTOMERIC ISOLATION MOUNTS
A. Restrained Elastomeric Isolation Mounts:
1. Description: All-directional isolator with seismic restraints containing two separate and opposing elastomeric elements that prevent central threaded element and attachment hardware from contacting the housing during normal operation. a. Housing: Cast-ductile iron or welded steel.
b. Elastomeric Material: Molded, oil-resistant rubber, neoprene, or other elastomeric material.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 3
2.5 ELASTOMERIC HANGERS
A. Elastomeric Mount in a Steel Frame with Upper and Lower Steel Hanger Rods:
1. Frame: Steel, fabricated with a connection for an upper threaded hanger rod and an opening on the underside to allow for a maximum of 30 degrees of angular lower hangerrod misalignment without binding or reducing isolation efficiency.
2. Damping Element: Molded, oil-resistant rubber, neoprene, or other elastomeric material with a projecting bushing for the underside opening preventing steel to steel contact.
2.6 POST-INSTALLED CONCRETE ANCHORS
A. Mechanical Anchor Bolts:
1. Drilled-in and stud-wedge or female-wedge type in zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength for anchor and as tested according to ASTM E488/E488M.
B. Provide post-installed concrete anchors that have been prequalified for use in wind-load applications. Post-installed concrete anchors must comply with all requirements of ASCE/SEI 7- 05, Ch. 13
1. Prequalify post-installed anchors in concrete in accordance with ACI 355.2 or other approved qualification testing procedures.
2. Prequalify post-installed anchors in masonry in accordance with approved qualification procedures.
C. Expansion-type anchor bolts are not permitted for equipment in excess of 10 hp that is not vibration isolated.
1. Undercut expansion anchors are permitted.
2.7 CONCRETE INSERTS
A. Provide preset concrete inserts that are seismically prequalified in accordance with ICCES AC466 testing.
B. Comply with ANSI/MSS SP-58.
PART 3 - EXECUTION
3.1 APPLICATIONS
A. Multiple Pipe Supports: Secure pipes to trapeze member with clamps approved for application by an agency acceptable to authorities having jurisdiction Indicate on Drawings, in schedules, or a combination of both, the locations where hanger rods for individual pipes and hanger rods for trapeze hangers require hanger-rod stiffeners.
B. Hanger-Rod Stiffeners: Install where indicated or scheduled on Drawings to receive them and where required to prevent buckling of hanger rods due to seismic forces.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 4
C. Strength of Support and Seismic-Restraint Assemblies: Where not indicated, select sizes of components so strength is adequate to carry present and future static and seismic loads within specified loading limits.
3.2 INSTALLATION OF VIBRATION-CONTROL AND SEISMIC-RESTRAINT DEVICES A. Provide vibration-control devices for systems and equipment where indicated in Equipment Schedules or Vibration-Control Devices Schedules, where indicated on Drawings, or where Specifications indicate they are to be installed on specific equipment and systems.
B. Provide seismic-restraint devices for systems and equipment where indicated in Equipment Schedules or Seismic-Restraint Devices Schedules, where indicated on Drawings, where Specifications indicate they are to be installed on specific equipment and systems, and where required by applicable codes.
C. Coordinate location of embedded connection hardware with supported equipment attachment and mounting points and with requirements for concrete reinforcement and formwork specified in Section 033000 "Cast-in-Place Concrete."
D. Installation of vibration isolators must not cause any change of position of equipment, piping, or ductwork resulting in stresses or misalignment.
E. Comply with requirements in Section 077200 "Roof Accessories" for installation of roof curbs, equipment supports, and roof penetrations.
F. Equipment Restraints:
1. Install seismic snubbers on HVAC equipment mounted on vibration isolators. Locate snubbers as close as possible to vibration isolators and bolt to equipment base and supporting structure.
2. Install resilient bolt isolation washers on equipment anchor bolts where clearance between anchor and adjacent surface exceeds 0.125 inch
3. Install seismic-restraint devices using methods approved by an agency acceptable to authorities having jurisdiction that provides required submittals for component.
G. Piping Restraints:
1. Comply with requirements in MSS SP-127.
2. Space lateral supports a maximum of 40 feet o.c., and longitudinal supports a maximum of 80 feet o.c.
3. Brace a change of direction longer than 12 feet
H. Ductwork Restraints:
1. Install ducts with hangers and braces designed to support the duct and to restrain against seismic forces required by applicable building codes. Comply with SMACNA's "Seismic Restraint Manual: Guidelines for Mechanical Systems."
2. Space lateral supports a maximum of 40 feet o.c., and longitudinal supports a maximum of 80 feet o.c.
3. Brace a change of direction longer than 12 feet
4. Select seismic-restraint devices with capacities adequate to carry static and seismic loads.
5. Install cable restraints on ducts that are suspended with vibration isolators.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 5
I. Install seismic-restraint cables so they do not bend across edges of adjacent equipment or building structure.
J. Install seismic-restraint devices using methods approved by an agency acceptable to authorities having jurisdiction that provides required submittals for component.
K. Install bushing assemblies for anchor bolts for floor-mounted equipment, arranged to provide resilient media between anchor bolt and mounting hole in concrete base.
L. Install bushing assemblies for mounting bolts for wall-mounted equipment, arranged to provide resilient media where equipment or equipment-mounting channels are attached to wall.
M. Attachment to Structure: If specific attachment is not indicated, anchor bracing to structure at flanges of beams, at upper truss chords of bar joists, or at concrete members.
N. Mechanical Anchor Bolts:
1. Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors. Do not damage existing reinforcing or embedded items during coring or drilling.
Notify structural engineer if reinforcing steel or other embedded items are encountered during drilling. Locate and avoid prestressed tendons, electrical and telecommunications conduit, and gas lines.
2. Do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength.
3. Wedge-Type Anchor Bolts: Protect threads from damage during anchor installation.
Heavy-duty sleeve anchors to be installed with sleeve fully engaged in the structural element to which anchor is to be fastened.
4. Set anchors to manufacturer's recommended torque, using a torque wrench.
5. Install zinc-coated steel anchors for interior and stainless steel anchors for exterior applications.
3.3 ACCOMMODATION OF DIFFERENTIAL SEISMIC MOTION
A. Provide flexible connections in piping systems where they cross structural seismic joints and other point where differential movement may occur. Provide adequate flexibility to accommodate differential movement as determined in accordance with ASCE/SEI 7. Comply with requirements in Section 232113 "Hydronic Piping" and Section 232116 "Hydronic Piping Specialties" for piping flexible connections.
3.4 ADJUSTING
A. Adjust isolators after system is at operating weight.
B. Adjust limit stops on restrained-spring isolators to mount equipment at normal operating height.
After equipment installation is complete, adjust limit stops so they are out of contact during normal operation.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
B. Tests and Inspections:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
VIBRATION AND SEISMIC CONTROLS FOR HVAC
230548 - 6
1. Perform tests and inspections
2. Provide evidence of recent calibration of test equipment by a testing agency acceptable to authorities having jurisdiction.
3. Schedule test with Owner before connecting anchorage device to restrained component (unless postconnection testing has been approved), and with at least seven days' advance notice.
4. Obtain Owner Representative approval before transmitting test loads to structure. Provide temporary load-spreading members.
5. Test no fewer than four of each type and size of installed anchors and fasteners selected by Owner Representative.
6. Test to 90 percent of rated proof load of device.
7. Measure isolator restraint clearance.
8. Measure isolator deflection.
9. Verify snubber minimum clearances.
C. Remove and replace malfunctioning units and retest as specified above.
D. Units will be considered defective if they do not pass tests and inspections.
E. Prepare test and inspection reports.
END OF SECTION 230548
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 1
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing, adjusting, and balancing of equipment.
2. Testing, adjusting, and balancing of existing HVAC systems and equipment.
3. HVAC-control system verification.
1.2 DEFINITIONS
A. AABC: Associated Air Balance Council.
B. NEBB: National Environmental Balancing Bureau.
C. TAB: Testing, adjusting, and balancing.
D. TABB: Testing, Adjusting, and Balancing Bureau.
E. TAB Specialist: An independent entity meeting qualifications to perform TAB work.
F. TDH: Total dynamic head.
G. UFAD: Underfloor air distribution.
1.3 INFORMATIONAL SUBMITTALS
A. Qualification Data: Within 30 days of Contractor's Notice to Proceed, submit documentation that the TAB specialist and this Project's TAB team members meet the qualifications specified in "Quality Assurance" Article.
B. Contract Documents Examination Report: Within 30 days of Contractor's Notice to Proceed, submit the Contract Documents review report, as specified in Part 3.
C. Strategies and Procedures Plan: Within 30 days of Contractor's Notice to Proceed, submit TAB strategies and step-by-step procedures, as specified in "Preparation" Article.
D. System Readiness Checklists: Within 30 days of Contractor's Notice to Proceed, submit system readiness checklists, as specified in "Preparation" Article.
E. Examination Report: Submit a summary report of the examination review required in "Examination" Article.
F. Certified TAB reports.
G. Sample report forms.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 2
H. Instrument calibration reports, to include the following:
1. Instrument type and make.
2. Serial number.
3. Application.
4. Dates of use.
5. Dates of calibration.
1.4 QUALITY ASSURANCE
A. TAB Specialists Qualifications, Certified by NEBB or TABB:
1. TAB Field Supervisor: Employee of the TAB specialist and certified by NEBB or TABB.
2. TAB Technician: Employee of the TAB specialist and certified by NEBB or TABB B. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in ASHRAE 111, Section 4, "Instrumentation."
C. ASHRAE/IES 90.1 Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6.7.2.3 - "System Balancing."
D. Code and AHJ Compliance: TAB is required to comply with governing codes and requirements of authorities having jurisdiction.
1.5 FIELD CONDITIONS
A. Full Owner Occupancy: Owner will occupy the site and existing building during entire TAB period.
Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems designs that may preclude proper TAB of systems and equipment.
B. Examine installed systems for balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, balancing valves and fittings, and manual volume dampers. Verify that locations of these balancing devices are applicable for intended purpose and are accessible.
C. Examine the approved submittals for HVAC systems and equipment.
D. Examine design data, including HVAC system descriptions, statements of design assumptions for environmental conditions and systems output, and statements of philosophies and assumptions about HVAC system and equipment controls.
E. Examine ceiling plenums and underfloor air plenums used for HVAC to verify that they are properly separated from adjacent areas and sealed.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 3
F. Examine equipment performance data, including fan and pump curves.
1. Relate performance data to Project conditions and requirements, including system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.
2. Calculate system-effect factors to reduce performance ratings of HVAC equipment when installed under conditions different from the conditions used to rate equipment performance. To calculate system effects for air systems, use tables and charts found in AMCA 201, "Fans and Systems," or in SMACNA's "HVAC Systems - Duct Design." Compare results with the design data and installed conditions.
G. Examine system and equipment installations and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.
H. Examine test reports specified in individual system and equipment Sections.
I. Examine HVAC equipment and verify that bearings are greased, belts are aligned and tight, filters are clean, and equipment with functioning controls is ready for operation.
J. Examine terminal units, such as variable-air-volume boxes, and verify that they are accessible and their controls are connected and functioning.
K. Examine temporary and permanent strainers. Verify that temporary strainer screens used during system cleaning and flushing have been removed and permanent strainer baskets are installed and clean.
L. Examine control valves for proper installation for their intended function of isolating, throttling, diverting, or mixing fluid flows.
M. Examine heat-transfer coils for correct piping connections and for clean and straight fins.
N. Examine system pumps to ensure absence of entrained air in the suction piping.
O. Examine operating safety interlocks and controls on HVAC equipment.
P. Examine control dampers for proper installation for their intended function of isolating, throttling, diverting, or mixing air flows.
Q. Report deficiencies discovered before and during performance of TAB procedures. Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.
3.2 PREPARATION
A. Prepare a TAB plan that includes the following:
1. Equipment and systems to be tested.
2. Strategies and step-by-step procedures for balancing the systems.
3. Instrumentation to be used.
4. Sample forms with specific identification for all equipment.
B. Perform system-readiness checks of HVAC systems and equipment to verify system readiness for TAB work. Include, at a minimum, the following:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 4
1. Airside:
a. Verify that leakage and pressure tests on air distribution systems have been satisfactorily completed.
b. Duct systems are complete with terminals installed.
c. Volume, smoke, and fire dampers are open and functional. d. Clean filters are installed.
e. Fans are operating, free of vibration, and rotating in correct direction. f. Variable-frequency controllers' startup is complete and safeties are verified. g. Automatic temperature-control systems are operational. h. Ceilings are installed.
i. Windows and doors are installed.
j. Suitable access to balancing devices and equipment is provided.
2. Hydronics:
a. Verify leakage and pressure tests on water distribution systems have been satisfactorily completed.
b. Piping is complete with terminals installed.
c. Water treatment is complete.
d. Systems are flushed, filled, and air purged.
e. Strainers are pulled and cleaned.
f. Control valves are functioning in accordance with the sequence of operation. g. Shutoff and balance valves have been verified to be 100 percent open. h. Pumps are started and proper rotation is verified.
i. Pump gauge connections are installed directly at pump inlet and outlet flanges or in discharge and suction pipe prior to valves or strainers. j. Variable-frequency controllers' startup is complete and safeties are verified. k. Suitable access to balancing devices and equipment is provided.
3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING
A. Perform testing and balancing procedures on each system in accordance with the procedures contained in NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and in this Section.
B. Cut insulation, ducts, pipes, and equipment casings for installation of test probes to the minimum extent necessary for TAB procedures.
1. After testing and balancing, patch probe holes in ducts with same material and thickness as used to construct ducts.
2. Where holes for probes are required in piping or hydronic equipment, install pressure and temperature test plugs to seal systems.
3. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish in accordance with Section 230713 "Duct Insulation," Section 230716 "HVAC Equipment Insulation," and Section 230719 "HVAC Piping Insulation."
C. Mark equipment and balancing devices, including damper-control positions, valve position indicators, fan-speed-control levers, and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.
D. Take and report testing and balancing measurements in [inch-pound (IP)] [and] [metric (SI)] units.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 5
3.4 TESTING, ADJUSTING, AND BALANCING OF HVAC EQUIPMENT A. Test, adjust, and balance HVAC equipment indicated on Drawings, including, but not limited to, the following:
1. Fans and ventilators.
3.5 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS
A. Prepare test reports for both fans and outlets. Obtain manufacturer's outlet factors and recommended testing procedures. Crosscheck the summation of required outlet volumes with required fan volumes.
B. Prepare schematic diagrams of systems' Record drawings duct layouts.
C. For variable-air-volume systems, develop a plan to simulate diversity.
D. Determine the best locations in main and branch ducts for accurate duct-airflow measurements.
E. Check airflow patterns from the outdoor-air louvers and dampers and the return- and exhaust-air dampers through the supply-fan discharge and mixing dampers.
F. Locate start-stop and disconnect switches, electrical interlocks, and motor starters.
G. Verify that motor starters are equipped with properly sized thermal protection.
H. Check dampers for proper position to achieve desired airflow path.
I. Check for airflow blockages.
J. Check condensate drains for proper connections and functioning.
K. Check for proper sealing of air-handling-unit components.
3.6 PROCEDURES FOR CONSTANT-VOLUME AIR SYSTEMS
A. Adjust fans to deliver total indicated airflows within the maximum allowable fan speed listed by fan manufacturer.
1. Measure total airflow.
a. Set outside-air, return-air, and relief-air dampers for proper position that simulates minimum outdoor-air conditions.
b. Where duct conditions allow, measure airflow by main Pitot-tube traverse. If necessary, perform multiple Pitot-tube traverses close to the fan and prior to any outlets, to obtain total airflow.
c. Where duct conditions are unsuitable for Pitot-tube traverse measurements, a coil traverse may be acceptable.
2. Measure fan static pressures as follows:
a. Measure static pressure directly at the fan outlet or through the flexible connection. b. Measure static pressure directly at the fan inlet or through the flexible connection.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 6
c. Measure static pressure across each component that makes up the air-handling system.
d. Report artificial loading of filters at the time static pressures are measured.
3. Do not make fan-speed adjustments that result in motor overload. Consult equipment manufacturers about fan-speed safety factors. Modulate dampers and measure fan-motor amperage to ensure that no overload occurs. Measure amperage in full-cooling, fullheating, economizer, and any other operating mode to determine the maximum required brake horsepower.
B. Adjust volume dampers for main duct, submain ducts, and major branch ducts to indicated airflows.
1. Measure airflow of submain and branch ducts.
2. Adjust submain and branch duct volume dampers for specified airflow.
3. Re-measure each submain and branch duct after all have been adjusted.
C. Adjust air inlets and outlets for each space to indicated airflows.
1. Set airflow patterns of adjustable outlets for proper distribution without drafts.
2. Measure inlets and outlets airflow.
3. Adjust each inlet and outlet for specified airflow.
4. Re-measure each inlet and outlet after they have been adjusted.
D. Verify final system conditions.
1. Re-measure and confirm that minimum outdoor, return, and relief airflows are within design. Readjust to design if necessary.
2. Re-measure and confirm that total airflow is within design.
3. Re-measure all final fan operating data, speed, volts, amps, and static profile.
4. Mark all final settings.
5. Test system in economizer mode. Verify proper operation and adjust if necessary.
6. Measure and record all operating data.
7. Record final fan-performance data.
3.7 HVAC CONTROLS VERIFICATION
Coordinate requirements of this article with Project commissioning, and edit requirements to avoid duplication.
A. In conjunction with system balancing, perform the following:
1. Verify HVAC control system is operating within the design limitations.
2. Confirm that the sequences of operation are in compliance with Contract Documents.
3. Verify that controllers are calibrated and function as intended.
4. Verify that controller set points are as indicated.
5. Verify the operation of lockout or interlock systems.
6. Verify the operation of valve and damper actuators.
7. Verify that controlled devices are properly installed and connected to correct controller.
8. Verify that controlled devices travel freely and are in position indicated by controller: open, closed, or modulating.
9. Verify location and installation of sensors to ensure that they sense only intended temperature, humidity, or pressure.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 7
B. Reporting: Include a summary of verifications performed, remaining deficiencies, and variations from indicated conditions.
3.8 PROCEDURES FOR TESTING, ADJUSTING, AND BALANCING EXISTING SYSTEMS A. Perform a preconstruction inspection of existing equipment that is to remain and be reused.
1. Measure and record the operating speed, airflow, and static pressure of each fan and equipment with fan(s).
2. Measure and record flows, temperatures, and pressures of each piece of equipment in each hydronic system. Compare the values to design or nameplate information, where information is available.
3. Measure motor voltage and amperage. Compare the values to motor nameplate information.
4. Check the refrigerant charge.
5. Check the condition of filters.
6. Check the condition of coils.
7. Check the operation of the drain pan and condensate-drain trap.
8. Check bearings and other lubricated parts for proper lubrication.
9. Report on the operating condition of the equipment and the results of the measurements taken. Report deficiencies.
B. TAB After Construction: Before performing testing and balancing of renovated existing systems, inspect existing equipment that is to remain and be reused to verify that existing equipment has been cleaned and refurbished in accordance with renovation scope indicated by Contract Documents. Verify the following:
1. New filters are installed.
2. Coils are clean and fins combed.
3. Drain pans are clean.
4. Fans are clean.
5. Bearings and other parts are properly lubricated.
6. Deficiencies noted in the preconstruction report are corrected.
C. Perform testing and balancing of existing systems to the extent that existing systems are affected by the renovation work.
1. Compare the indicated airflow of the renovated work to the measured fan airflows, and determine the new fan speed and the face velocity of filters and coils.
2. Verify that the indicated airflows of the renovated work result in filter and coil face velocities and fan speeds that are within the acceptable limits defined by equipment manufacturer.
3. If calculations increase or decrease the airflow rates and water flow rates by more than 5 percent, make equipment adjustments to achieve the calculated rates. If increase or decrease is 5 percent or less, equipment adjustments are not required.
4. Balance each air outlet.
3.9 TOLERANCES
A. Set HVAC system's airflow rates and water flow rates within the following tolerances:
1. Supply, Return, and Exhaust Fans and Equipment with Fans: Plus or minus 10 percent. If design value is less than 100 cfm, within 10 cfm
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 8
2. Air Outlets and Inlets: Plus or minus 10 percent. If design value is less than 100 cfm, within 10 cfm
B. Maintaining pressure relationships as designed shall have priority over the tolerances specified above.
3.10 PROGRESS REPORTING
A. Initial Construction-Phase Report: Based on examination of the Contract Documents as specified in "Examination" Article, prepare a report on the adequacy of design for system-balancing devices. Recommend changes and additions to system-balancing devices, to facilitate proper performance measuring and balancing. Recommend changes and additions to HVAC systems and general construction to allow access for performance-measuring and -balancing devices.
B. Status Reports: Prepare monthly progress reports to describe completed procedures, procedures in progress, and scheduled procedures. Include a list of deficiencies and problems found in systems being tested and balanced. Prepare a separate report for each system and each building floor for systems serving multiple floors.
3.11 FINAL REPORT
A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.
1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.
2. Include a list of instruments used for procedures, along with proof of calibration.
3. Certify validity and accuracy of field data.
B. Final Report Contents: In addition to certified field-report data, include the following:
1. Pump curves.
2. Fan curves.
3. Manufacturers' test data.
4. Field test reports prepared by system and equipment installers.
5. Other information relative to equipment performance; do not include Shop Drawings and Product Data.
C. General Report Data: In addition to form titles and entries, include the following data:
1. Title page.
2. Name and address of the TAB specialist.
3. Project name.
4. Project location.
5. Architect's name and address.
6. Engineer's name and address.
7. Contractor's name and address.
8. Report date.
9. Signature of TAB supervisor who certifies the report.
10. Table of Contents with the total number of pages defined for each section of the report.
Number each page in the report.
11. Summary of contents, including the following:
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 9
a. Indicated versus final performance.
b. Notable characteristics of systems.
c. Description of system operation sequence if it varies from the Contract Documents.
12. Nomenclature sheets for each item of equipment.
13. Data for terminal units, including manufacturer's name, type, size, and fittings.
14. Notes to explain why certain final data in the body of reports vary from indicated values.
15. Test conditions for fans performance forms, including the following:
a. Settings for outdoor-, return-, and exhaust-air dampers. b. Conditions of filters.
c. Cooling coil, wet- and dry-bulb conditions.
d. Heating coil, dry-bulb conditions.
e. Face and bypass damper settings at coils.
f. Fan drive settings, including settings and percentage of maximum pitch diameter. g. Variable-frequency controller settings for variable-air-volume systems. h. Settings for pressure controller(s).
i. Other system operating conditions that affect performance.
16. Test conditions for pump performance forms, including the following:
a. Variable-frequency controller settings for variable-flow hydronic systems. b. Settings for pressure controller(s).
c. Other system operating conditions that affect performance.
D. Fan Test Reports: For supply, return, and exhaust fans, include the following:
1. Fan Data:
a. System identification.
b. Location.
c. Make and type.
d. Model number and size.
e. Manufacturer's serial number.
f. Arrangement and class.
g. Sheave make, size in inches, and bore.
h. Center-to-center dimensions of sheave and amount of adjustments in inches
2. Motor Data:
a. Motor make, and frame type and size.
b. Horsepower and speed.
c. Volts, phase, and hertz.
d. Full-load amperage and service factor.
e. Sheave make, size in inches, and bore.
f. Center-to-center dimensions of sheave and amount of adjustments in inches g. Number, make, and size of belts.
3. Test Data (Indicated and Actual Values):
a. Total airflow rate in cfm
b. Total system static pressure in inches wg
c. Fan speed.
d. Discharge static pressure in inches wg
e. Suction static pressure in inches wg
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 10
E. Round, Flat-Oval, and Rectangular Duct Traverse Reports: Include a diagram with a grid representing the duct cross-section and record the following:
1. Report Data:
a. System fan and air-handling-unit number.
b. Location and zone.
c. Traverse air temperature in deg F
d. Duct static pressure in inches wg
e. Duct size in inches
f. Duct area in sq. ft.
g. Indicated airflow rate in cfm
h. Indicated velocity in fpm
i. Actual airflow rate in cfm
j. Actual average velocity in fpm
k. Barometric pressure in psig
3.12 VERIFICATION OF TAB REPORT
A. The TAB specialist's test and balance engineer shall conduct the inspection in the presence of Construction Manager
B. Construction Manager shall randomly select measurements, documented in the final report, to be rechecked. Rechecking shall be limited to the lesser of either 10 percent of the total measurements recorded or the extent of measurements that can be accomplished in a normal 8- hour business day
C. If rechecks yield measurements that differ from the measurements documented in the final report by more than the tolerances allowed, the measurements shall be noted as "FAILED." D. If the number of "FAILED" measurements is greater than 10 percent of the total measurements checked during the final inspection, the TAB shall be considered incomplete and shall be rejected.
E. If recheck measurements find the number of failed measurements noncompliant with requirements indicated, proceed as follows:
1. TAB specialists shall recheck all measurements and make adjustments. Revise the final report and balancing device settings to include all changes; resubmit the final report and request a second final inspection. All changes shall be tracked to show changes made to previous report.
2. If the second final inspection also fails, Owner may pursue others Contract options to complete TAB work.
F. Prepare test and inspection reports.
3.13 ADDITIONAL TESTS
A. Within 90 days of completing TAB, perform additional TAB to verify that balanced conditions are being maintained throughout and to correct unusual conditions.
B. Seasonal Periods: If initial TAB procedures were not performed during near-peak summer and winter conditions, perform additional TAB during near-peak summer and winter conditions.
For Council Approval
Not for Bidding
ROSEVILLE AQUATICS COMPLEX RENOVATION
May 4, 2026
TESTING, ADJUSTING, AND BALANCING FOR HVAC
230593 - 11
END OF SECTION 230593
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 1
SECTION 23 07 13
DUCT INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes insulating the following duct services:
1. Indoor, concealed exhaust between isolation damper and penetration of building exterior.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Field quality-control reports.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Surface-Burning Characteristics: For insulation and related materials, as determined by testing identical products in accordance with ASTM E84, by a testing agency acceptable to authorities having jurisdiction. Factory label insulation, jacket materials, adhesive, mastic, tapes, and cement material containers with appropriate markings of applicable testing agency.
1. All Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.
2.2 INSULATION MATERIALS
A. Comply with requirements in "Duct Insulation Schedule, General," "Indoor Duct and Plenum Insulation Schedule," and "Aboveground, Outdoor Duct and Plenum Insulation Schedule" articles for where insulating materials are applied.
B. Products do not contain asbestos, lead, mercury, or mercury compounds.
C. Products that come in contact with stainless steel have a leachable chloride content of less than 50 ppm when tested in accordance with ASTM C871.
D. Insulation materials for use on austenitic stainless steel are qualified as acceptable in accordance with ASTM C795.
E. Foam insulation materials do not use CFC or HCFC blowing agents in the manufacturing process.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 2
F. Glass-Fiber Blanket: Glass fibers bonded with a thermosetting resin; suitable for maximum use temperature up to 450 deg F in accordance with ASTM C411. Comply with ASTM C553, Type II, and ASTM C1290, Type III with factory-applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.
2.3 FIRE-RATED INSULATION SYSTEMS
A. Fire-Rated Blanket: High-temperature, flexible, blanket insulation with FSK jacket that is tested and certified to provide a 1-hour fire rating by an NRTL acceptable to authorities having jurisdiction.
2.4 ADHESIVES
A. Materials are compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated unless otherwise indicated.
B. ASJ Adhesive, and FSK Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.
2.5 MASTICS AND COATINGS
A. Materials shall be compatible with insulation materials, jackets, and substrates.
B. Vapor-Retarder Mastic, Water Based, Interior Use: Suitable for indoor use on below ambient services.
1. Water-Vapor Permeance: Comply with ASTM C755, Section 7.2.2, Table 2, for insulation type and service conditions.
2. Service Temperature Range: Minus 20 to plus 180 deg F
3. Comply with MIL-PRF-19565C, Type II, for permeance requirements
4. Color: White
C. Breather Mastic: Water based; suitable for indoor and outdoor use on above ambient services.
1. Water-Vapor Permeance: ASTM E96/E96M, greater than 1.0 permat manufacturer's recommended dry film thickness.
2. Service Temperature Range: Minus 20 to plus 180 deg F
3. Color: White
2.6 SEALANTS
A. FSK and Metal Jacket Flashing Sealants:
1. Materials are compatible with insulation materials, jackets, and substrates.
2. Fire- and water-resistant, flexible, elastomeric sealant.
3. Service Temperature Range: Minus 40 to plus 250 deg F
4. Color: Aluminum.
2.7 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 3
1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing; complying with ASTM C1136, Type I.
2. ASJ-SSL: ASJ with self-sealing, pressure-sensitive, acrylic-based adhesive covered by a removable protective strip; complying with ASTM C1136, Type I.
3. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing; complying with ASTM C1136, Type II.
4. FSP Jacket: Aluminum-foil, fiberglass-reinforced scrim with polyethylene backing; complying with ASTM C1136, Type II.
5. Vinyl Jacket: White vinyl with a permeance of 1.3 perms when tested in accordance with ASTM E96/E96M, Procedure A, and complying with NFPA 90A and NFPA 90B.
6. ASJ+: All-service jacket composed of aluminum foil reinforced with glass scrim bonded to a kraft paper interleaving with an outer film leaving no paper exposed; complying with ASTM C1136, Types I, II, III, IV, and VII
7. PSK Jacket: Aluminum foil, fiberglass-reinforced scrim with polyethylene backing; complying with ASTM C 1136, Type II.
2.8 FIELD-APPLIED FABRIC-REINFORCING MESH
A. Woven Polyester Mesh: Approximately 1 oz./sq. yd. with a thread count of 10 strands by 10 strands/sq. in., in a Leno weave, for ducts.
2.9 TAPES
A. FSK Tape: Foil-face, vapor-retarder tape matching factory-applied jacket with acrylic adhesive; complying with ASTM C1136.
1. Width: 3 inches
2. Thickness: 6.5 mils
3. Adhesion: 90 ounces force/inch in width.
4. Elongation: 2 percent.
5. Tensile Strength: 40 lbf/inch in width.
6. FSK Tape Disks and Squares: Precut disks or squares of FSK tape.
2.10 SECUREMENTS
A. Aluminum Bands: ASTM B209, Alloy 3003, 3005, 3105, or 5005; Temper H-14, 0.020 inch, 1/2 inch wide with wing seal or closed seal.
B. Insulation Pins and Hangers:
1. Metal, Adhesively Attached, Perforated-Base Insulation Hangers: Baseplate welded to projecting spindle that is capable of holding insulation, of thickness indicated, securely in position indicated when self-locking washer is in place. Comply with the following requirements:
a. Baseplate: Perforated, galvanized carbon-steel sheet, 0.030 inch thick by 2 inches square.
b. Spindle: Copper- or zinc-coated, low-carbon steel, fully annealed, 0.106-inchdiameter shank, length to suit depth of insulation indicated. c. Adhesive: Recommended by hanger manufacturer. Product with demonstrated capability to bond insulation hanger securely to substrates indicated without damaging insulation, hangers, and substrates.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 4
2. Nonmetal, Adhesively Attached, Perforated-Base Insulation Hangers: Baseplate fastened to projecting spindle that is capable of holding insulation, of thickness indicated, securely in position indicated when self-locking washer is in place. Comply with the following requirements:
a. Baseplate: Perforated, nylon sheet, 0.030 inch thick by 1-1/2 inches in diameter. b. Spindle: Nylon, 0.106-inch-diameter shank, length to suit depth of insulation indicated, up to 2-1/2 inches.
c. Adhesive: Recommended by hanger manufacturer. Product with demonstrated capability to bond insulation hanger securely to substrates indicated without damaging insulation, hangers, and substrates.
3. Self-Sticking-Base Insulation Hangers: Baseplate welded to projecting spindle that is capable of holding insulation, of thickness indicated, securely in position indicated when self-locking washer is in place. Comply with the following requirements:
a. Baseplate: Galvanized carbon-steel sheet, 0.030 inch thick by 2 inches square. b. Spindle: Copper- or zinc-coated, low-carbon steel, fully annealed, 0.106-inchdiameter shank, length to suit depth of insulation indicated. c. Adhesive-backed base with a peel-off protective cover.
4. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch-thick, galvanized-steel sheet, with beveled edge sized as required to hold insulation securely in place but not less than 1-1/2 inches in diameter.
a. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap in exposed locations.
5. Nonmetal Insulation-Retaining Washers: Self-locking washers formed from 0.016-inchthick nylon sheet, with beveled edge sized as required to hold insulation securely in place but not less than 1-1/2 inches in diameter.
C. Staples: Outward-clinching insulation staples, nominal 3/4-inch-wide, stainless steel or Monel.
D. Wire: 0.062-inch soft-annealed, stainless steel
2.11 CORNER ANGLES
A. PVC Corner Angles: 30 mils thick, minimum 1 by 1 inch, PVC in accordance with ASTM D1784, Class 16354-C. White or color-coded to match adjacent surface.
B. Aluminum Corner Angles: 0.040 inch thick, minimum 1 by 1 inch, aluminum in accordance with ASTM B209, Alloy 3003, 3005, 3105, or 5005; Temper H-14.
PART 3 - EXECUTION
3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 5
3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of ducts and fittings.
B. Install insulation materials, vapor barriers or retarders, jackets, and thicknesses required for each item of duct system as specified in insulation system schedules.
C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, compress, or otherwise damage insulation or jacket.
D. Install insulation with longitudinal seams at top and bottom of horizontal runs.
E. Install multiple layers of insulation with longitudinal and end seams staggered.
F. Keep insulation materials dry during application and finishing. Replace insulation materials that get wet during storage or in the installation process before being properly covered and sealed in accordance with the Contract Documents.
G. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufacturer.
H. Install insulation with least number of joints practical.
I. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.
1. Install insulation continuously through hangers and around anchor attachments.
2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.
3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation material manufacturer.
J. Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.
K. Install insulation with factory-applied jackets as follows:
1. Draw jacket tight and smooth, but not to the extent of creating wrinkles or areas of compression in the insulation.
2. Cover circumferential joints with 3-inch-wide strips, of same material as insulation jacket.
Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.
3. Overlap jacket longitudinal seams at least 1-1/2 inches. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 2 inches o.c. a. For below ambient services, apply vapor-barrier mastic over staples.
4. Cover joints and seams with tape, according to insulation material manufacturer's written instructions, to maintain vapor seal.
5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends adjacent to duct flanges and fittings.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 6
L. Cut insulation in a manner to avoid compressing insulation.
M. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.
N. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.
3.3 PENETRATIONS
A. Insulation Installation at Roof Penetrations: Install insulation continuously through roof penetrations.
1. Seal penetrations with flashing sealant.
2. For applications requiring only indoor insulation, terminate insulation above roof surface and seal with joint sealant. For applications requiring indoor and outdoor insulation, install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.
3. Extend jacket of outdoor insulation outside roof flashing at least 2 inches below top of roof flashing.
4. Seal jacket to roof flashing with flashing sealant.
B. Insulation Installation at Aboveground Exterior Wall Penetrations: Install insulation continuously through wall penetrations.
1. Seal penetrations with flashing sealant.
2. For applications requiring only indoor insulation, terminate insulation inside wall surface and seal with joint sealant. For applications requiring indoor and outdoor insulation, install insulation for outdoor applications tightly joined to indoor insulation ends. Seal joint with joint sealant.
3. Extend jacket of outdoor insulation outside wall flashing and overlap wall flashing at least 2 inches.
4. Seal jacket to wall flashing with flashing sealant.
C. Insulation Installation at Interior Wall and Partition Penetrations (That Are Not Fire Rated): Install insulation continuously through walls and partitions.
D. Insulation Installation at Fire-Rated Wall and Partition Penetrations: Terminate insulation at fire damper sleeves for fire-rated wall and partition penetrations. Externally insulate damper sleeves to match adjacent insulation and overlap duct insulation at least 2 inches.
1. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping and fire-resistive joint sealers.
E. Insulation Installation at Floor Penetrations:
1. Duct: For penetrations through fire-rated assemblies, terminate insulation at fire damper sleeves and externally insulate damper sleeve beyond floor to match adjacent duct insulation. Overlap damper sleeve and duct insulation at least 2 inches.
2. Seal penetrations through fire-rated assemblies. Comply with requirements in Section 078413 "Penetration Firestopping."
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 7
3.4 INSTALLATION OF GLASS-FIBER AND MINERAL-WOOL INSULATION A. Blanket Insulation Installation on Ducts and Plenums: Secure with adhesive and insulation pins.
B. Comply with manufacturer's written installation instructions.
1. Apply adhesives according to manufacturer's recommended coverage rates per unit area, for 50 percent coverage of duct and plenum surfaces.
2. Apply adhesive to entire circumference of ducts and to all surfaces of fittings and transitions except the top surface of rectangular horizontal duct
3. Install either capacitor-discharge-weld pins and speed washers or cupped-head, capacitordischarge-weld pins on sides and bottom of horizontal ducts and sides of vertical ducts as follows:
a. On duct sides with dimensions 18 inches and smaller, place pins along longitudinal centerline of duct. Space 3 inches maximum from insulation end joints, and 16 inches o.c.
b. On duct sides with dimensions larger than 18 inches, place pins 16 inches o.c. each way, and 3 inches maximum from insulation joints. Install additional pins to hold insulation tightly against surface at cross bracing.
c. Pins may be omitted from top surface of horizontal, rectangular ducts and plenums. d. Do not overcompress insulation during installation.
e. Impale insulation over pins and attach speed washers. f. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching insulation facing.
4. For ducts and plenums with surface temperatures below ambient, install a continuous unbroken vapor barrier. Create a facing lap for longitudinal seams and end joints with insulation by removing 2 inches from one edge and one end of insulation segment. Secure laps to adjacent insulation section with 1/2-inch outward-clinching staples, 1 inch o.c. Install vapor barrier consisting of factory- or field-applied jacket, adhesive, vapor-barrier mastic, and sealant at joints, seams, and protrusions.
a. Repair punctures, tears, and penetrations with tape or mastic to maintain vaporbarrier seal. b. Install vapor stops for ductwork and plenums operating below 50 deg F at 18-foot intervals. Vapor stops consist of vapor-barrier mastic applied in a Z-shaped pattern over insulation face, along butt end of insulation, and over the surface. Cover insulation face and surface to be insulated a width equal to two times the insulation thickness, but not less than 3 inches.
5. Overlap unfaced blankets a minimum of 2 inches on longitudinal seams and end joints. At end joints, secure with steel bands spaced a maximum of 18 inches o.c.
6. Install insulation on rectangular duct elbows and transitions with a full insulation section for each surface. Install insulation on round and flat-oval duct elbows with individually mitered gores cut to fit the elbow.
7. Insulate duct stiffeners, hangers, and flanges that protrude beyond insulation surface with 6-inch- wide strips of same material used to insulate duct. Secure on alternating sides of stiffener, hanger, and flange with pins spaced 6 inches o.c.
C. Board Insulation Installation on Ducts and Plenums: Secure with adhesive and insulation pins.
1. Apply adhesives according to manufacturer's recommended coverage rates per unit area, for 50 percent coverage of duct and plenum surfaces.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 8
2. Apply adhesive to entire circumference of ducts and to all surfaces of fittings and transitions except the top surface of rectangular horizontal duct
3. Install either capacitor-discharge-weld pins and speed washers or cupped-head, capacitordischarge-weld pins on sides and bottom of horizontal ducts and sides of vertical ducts as follows:
a. On duct sides with dimensions 18 inches and smaller, place pins along longitudinal centerline of duct. Space 3 inches maximum from insulation end joints, and 16 inches o.c.
b. On duct sides with dimensions larger than 18 inches, space pins 16 inches o.c. each way, and 3 inches maximum from insulation joints. Install additional pins to hold insulation tightly against surface at cross bracing. c. Pins may be omitted from top surface of horizontal, rectangular ducts and plenums. d. Do not overcompress insulation during installation.
e. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching insulation facing.
4. For ducts and plenums with surface temperatures below ambient, install a continuous unbroken vapor barrier. Create a facing lap for longitudinal seams and end joints with insulation by removing 2 inches from one edge and one end of insulation segment. Secure laps to adjacent insulation section with 1/2-inch outward-clinching staples, 1 inch o.c. Install vapor barrier consisting of factory- or field-applied jacket, adhesive, vapor-barrier mastic, and sealant at joints, seams, and protrusions.
a. Repair punctures, tears, and penetrations with tape or mastic to maintain vaporbarrier seal. b. Install vapor stops for ductwork and plenums operating below 50 deg F at 18-foot intervals. Vapor stops consist of vapor-barrier mastic applied in a Z-shaped pattern over insulation face, along butt end of insulation, and over the surface. Cover insulation face and surface to be insulated a width equal to two times the insulation thickness, but not less than 3 inches.
5. Install insulation on rectangular duct elbows and transitions with a full insulation section for each surface. Groove and score insulation to fit as closely as possible to outside and inside radius of elbows. Install insulation on round and flat-oval duct elbows with individually mitered gores cut to fit the elbow.
6. Insulate duct stiffeners, hangers, and flanges that protrude beyond insulation surface with 6-inch- wide strips of same material used to insulate duct. Secure on alternating sides of stiffener, hanger, and flange with pins spaced 6 inches o.c.
3.5 FIRE-RATED INSULATION SYSTEM INSTALLATION
A. Comply with manufacturer's written installation instructions.
B. Where fire-rated insulation system is indicated, secure system to ducts and duct hangers and supports to maintain a continuous fire rating.
C. Insulate duct access panels and doors to achieve same fire rating as duct.
D. Install firestopping at penetrations through fire-rated assemblies. Fire-stop systems are specified in Section 078413 "Penetration Firestopping."
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 9
3.6 FINISHES
A. Insulation with ASJ or Other Paintable Jacket Material: Paint jacket with paint system identified below and as specified in Section 099113 "Exterior Painting" and Section 099123 "Interior Painting."
1. Flat Acrylic Finish: Two finish coats over a primer that is compatible with jacket material and finish coat paint. Add fungicidal agent to render fabric mildew proof. a. Finish Coat Material: Interior, flat, latex-emulsion size.
B. Color: Final color as selected by Owner’s Representative. Vary first and second coats to allow visual inspection of the completed Work.
C. Do not field paint aluminum or stainless steel jackets.
3.7 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Inspect ductwork, randomly selected by Owner’s Representative, by removing field-applied jacket and insulation in layers in reverse order of their installation. Extent of inspection is limited to one location for each duct system defined in the "Duct Insulation Schedule, General" Article.
C. All insulation applications will be considered defective Work if sample inspection reveals noncompliance with requirements.
3.8 DUCT INSULATION SCHEDULE, GENERAL
A. Plenums and Ducts Requiring Insulation:
1. Indoor, concealed exhaust between isolation damper and penetration of building exterior.
B. Items Not Insulated:
1. Fibrous-glass ducts.
2. Metal ducts with duct liner of sufficient thickness to comply with energy code and ASHRAE/IESNA 90.1.
3. Factory-insulated flexible ducts.
4. Factory-insulated plenums and casings.
5. Flexible connectors.
6. Vibration-control devices.
7. Factory-insulated access panels and doors.
3.9 INDOOR DUCT AND PLENUM INSULATION SCHEDULE
A. Concealed, Exhaust-Air Duct and Plenum Insulation: Glass-fiber blanket 1-1/2 inches thick and
0.75 lb/cu. ft. nominal density.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
DUCT INSULATION
230713 - 10
END OF SECTION 230713
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 1
SECTION 23 31 13
METAL DUCTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Single-wall rectangular ducts and fittings.
2. Single-wall round ducts and fittings.
3. Sheet metal materials.
4. Sealants and gaskets.
5. Hangers and supports.
B. Related Requirements:
1. Section 230548 "Vibration and Seismic Controls for HVAC" for seismic restraint devices and installation.
2. Section 230593 "Testing, Adjusting, and Balancing for HVAC" for testing, adjusting, and balancing requirements for metal ducts.
3. Section 233300 "Air Duct Accessories" for dampers, sound-control devices, duct-mounting access doors and panels, turning vanes, and flexible ducts.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of the following products:
1. Liners and adhesives.
2. Sealants and gaskets.
3. Seismic-restraint devices.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Field quality-control reports.
1.4 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel in accordance with the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel," for hangers and supports.
2. AWS D1.2/D1.2M, "Structural Welding Code - Aluminum," for aluminum supports.
3. AWS D9.1/D9.1M, "Sheet Metal Welding Code," for duct joint and seam welding.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 2
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance: Duct hangers and supports and seismic restraints are to withstand the effects of gravity and seismic loads and stresses within limits and under conditions described in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible". Seismically brace duct hangers and supports in accordance with SMACNA's "Seismic Restraint Manual: Guidelines for Mechanical Systems."
B. Seismic Performance: Ductwork to withstand the effects of earthquake motions determined in accordance with ASCE/SEI 7. See Section 230548 "Vibration and Seismic Controls for HVAC."
1. The term "withstand" means "the unit will remain in place without separation of any parts from the device when subjected to the seismic forces specified
2. Component Importance Factor: 1.0
C. Airstream Surfaces: Surfaces in contact with airstream comply with requirements in ASHRAE 62.1.
D. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 5 - "Systems and Equipment," and Section 7 - "Construction and System Startup." E. ASHRAE/IES Compliance: Applicable requirements in ASHRAE/IES 90.1, Section 6.4.4 - "HVAC System Construction and Insulation."
F. Duct Dimensions: Unless otherwise indicated, all duct dimensions indicated on Drawings are inside clear dimensions and do not include insulation or duct wall thickness.
2.2 SINGLE-WALL RECTANGULAR DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" based on indicated static-pressure class unless otherwise indicated.
1. Construct ducts of galvanized sheet steel unless otherwise indicated.
2. For ducts exposed to weather, construct of Type 304 stainless steel indicated by manufacturer to be suitable for outdoor installation.
B. Transverse Joints: Fabricate joints in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 2-1, "Rectangular Duct/Transverse Joints," for staticpressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
1. For ducts with longest side less than 36 inches, select joint types in accordance with Figure 2-1.
2. For ducts with longest side 36 inches or greater, use flange joint connector Type T-22, T24, T-24A, T-25a, or T-25b. Factory-fabricated flanged duct connection system may be used if submitted and approved by engineer of record.
C. Longitudinal Seams: Select seam types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 2-2, "Rectangular Duct/Longitudinal Seams," for static-pressure class, applicable sealing requirements, materials involved, ductsupport intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards For
- Metal
Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 3
and Flexible." All longitudinal seams are to be Pittsburgh lock seams unless otherwise specified for specific application.
D. Elbows, Transitions, Offsets, Branch Connections, and Other Duct Construction: Select types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Ch. 4, "Fittings and Other Construction," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
2.3 SINGLE-WALL ROUND DUCTS AND FITTINGS
A. General Fabrication Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Ch. 3, "Round, Oval, and Flexible Duct," based on indicated static-pressure class unless otherwise indicated.
1. Construct ducts of galvanized sheet steel unless otherwise indicated.
2. For ducts exposed to weather, construct of Type 304 stainless steel indicated by manufacturer to be suitable for outdoor installation.
B. Flat-Oval Ducts: Indicated dimensions are the duct width (major dimension) and diameter of the round sides connecting the flat portions of the duct (minor dimension).
C. Transverse Joints: Select joint types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-1, "Round Duct Transverse Joints," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
1. Transverse Joints in Ducts Larger Than 60 Inches in Diameter: Flanged.
D. Longitudinal Seams: Select seam types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-2, "Round Duct Longitudinal Seams," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
1. Fabricate round ducts larger than 90 inches in diameter with butt-welded longitudinal seams.
2. Fabricate flat-oval ducts larger than 72 inches in width (major dimension) with butt-welded longitudinal seams.
E. Tees and Laterals: Select types and fabricate in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-5, "90 Degree Tees and Laterals," and Figure 3-6, "Conical Tees," for static-pressure class, applicable sealing requirements, materials involved, duct-support intervals, and other provisions in SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
2.4 SHEET METAL MATERIALS
A. General Material Requirements: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for acceptable materials, material thicknesses, and duct construction methods unless otherwise indicated. Sheet metal materials are to be free of pitting, seam marks, roller marks, stains, discolorations, and other imperfections.
B. Galvanized Sheet Steel: Comply with ASTM
For
A653/A653M.
Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 4
1. Galvanized Coating Designation: G60
2. Finishes for Surfaces Exposed to View: Mill phosphatized.
C. Carbon-Steel Sheets: Comply with ASTM A1008/A1008M, with oiled, matte finish for exposed ducts.
D. Stainless Steel Sheets: Comply with ASTM A480/A480M, Type 304 or 316, as indicated in "Duct Schedule" Article; cold rolled, annealed, sheet. Exposed surface finish is to be No. 2B, No. 2D, No. 3, or No. 4 as indicated in "Duct Schedule" Article.
E. Aluminum Sheets: Comply with ASTM B209 Alloy 3003, H14 temper; with mill finish for concealed ducts, and standard, one-side bright finish for duct surfaces exposed to view.
F. Reinforcement Shapes and Plates: ASTM A36/A36M, steel plates, shapes, and bars; black and galvanized.
1. Where black- and galvanized-steel shapes and plates are used to reinforce aluminum ducts, isolate the different metals with butyl rubber, neoprene, or EPDM gasket materials.
G. Tie Rods: Galvanized steel, 1/4-inch- minimum diameter for lengths 36 inches or less; 3/8-inchminimum diameter for lengths longer than 36 inches
2.5 SEALANT AND GASKETS
A. General Sealant and Gasket Requirements: Surface-burning characteristics for sealants and gaskets are to be a maximum flame-spread index of 25 and a maximum smoke-developed index of 50 when tested in accordance with UL 723; certified by an NRTL.
B. Two-Part Tape Sealing System:
1. Tape: Woven cotton fiber impregnated with mineral gypsum and modified acrylic/silicone activator to react exothermically with tape to form hard, durable, airtight seal.
2. Tape Width: 3 inches.
3. Sealant: Modified styrene acrylic.
4. Water resistant.
5. Mold and mildew resistant.
6. Maximum Static-Pressure Class: 10-inch wg, positive and negative.
7. Service: Indoor and outdoor.
8. Service Temperature: Minus 40 to plus 200 deg F.
9. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum.
C. Water-Based Joint and Seam Sealant:
1. Application Method: Brush on.
2. Solids Content: Minimum 65 percent.
3. Shore A Hardness: Minimum 20.
4. Water resistant.
5. Mold and mildew resistant.
6. VOC: Maximum 75 g/L (less water).
7. Maximum Static-Pressure Class: 10-inch wg, positive and negative.
8. Service: Indoor or outdoor.
9. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum sheets.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 5
10. Maximum Static-Pressure Class: 10-inch wg, positive or negative.
11. Service: Indoor or outdoor.
12. Substrate: Compatible with galvanized sheet steel (both PVC coated and bare), stainless steel, or aluminum sheets.
D. Flanged Joint Sealant: Comply with ASTM C920.
1. General: Single-component, acid-curing, silicone, elastomeric.
2. Type: S.
3. Grade: NS.
4. Class: 25.
5. Use: O.
E. Flange Gaskets: Butyl rubber, neoprene, or EPDM polymer with polyisobutylene plasticizer.
F. Round Duct Joint O-Ring Seals:
1. Seal is to provide maximum leakage class of 3 cfm/100 sq. ft. at 1-inch wg and is to be rated for10-inch wg static-pressure class, positive or negative.
2. EPDM O-ring to seal in concave bead in coupling or fitting spigot.
3. Double-lipped, EPDM O-ring seal, mechanically fastened to factory-fabricated couplings and fitting spigots.
2.6 HANGERS AND SUPPORTS
A. Hanger Rods for Noncorrosive Environments: Galvanized-steel rods and nuts.
B. Hanger Rods for Corrosive Environments: Electrogalvanized, all-thread rods or galvanized rods with threads painted with zinc-chromate primer after installation.
C. Strap and Rod Sizes: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Table 5-1, "Rectangular Duct Hangers Minimum Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct."
D. Steel Cables for Galvanized-Steel Ducts: Galvanized steel complying with ASTM A603.
E. Steel Cables for Stainless Steel Ducts: Stainless steel complying with ASTM A492.
F. Steel Cable End Connections: Galvanized-steel assemblies with brackets, swivel, and bolts designed for duct hanger service; with an automatic-locking and clamping device.
G. Duct Attachments: Sheet metal screws, blind rivets, or self-tapping metal screws; compatible with duct materials.
H. Trapeze and Riser Supports:
1. Supports for Galvanized-Steel Ducts: Galvanized-steel shapes and plates.
2. Supports for Stainless Steel Ducts: Stainless steel shapes and plates.
3. Supports for Aluminum Ducts: Aluminum or galvanized steel coated with zinc chromate.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 6
PART 3 - EXECUTION
3.1 DUCT INSTALLATION
A. Drawing plans, schematics, and diagrams indicate general location and arrangement of duct system. Indicated duct locations, configurations, and arrangements were used to size ducts and calculate friction loss for air-handling equipment sizing and for other design considerations. Install duct systems as indicated unless deviations to layout are approved on Shop Drawings and coordination drawings.
B. Install ducts in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" unless otherwise indicated.
C. Install ducts in maximum practical lengths with fewest possible joints.
D. Install factory- or shop-fabricated fittings for changes in direction, size, and shape and for branch connections.
E. Unless otherwise indicated, install ducts vertically and horizontally, and parallel and perpendicular to building lines.
F. Install ducts close to walls, overhead construction, columns, and other structural and permanent enclosure elements of building.
G. Install ducts with a clearance of 1 inch, plus allowance for insulation thickness.
H. Route ducts to avoid passing through transformer vaults and electrical equipment rooms and enclosures.
I. Where ducts pass through non-fire-rated interior partitions and exterior walls and are exposed to view, cover the opening between the partition and duct or duct insulation with sheet metal flanges of same metal thickness as the duct. Overlap openings on four sides by at least 1-1/2 inches.
J. Install fire and smoke dampers where indicated on Drawings and as required by code, and by local authorities having jurisdiction. Comply with requirements in Section 233300 "Air Duct Accessories" for fire and smoke dampers and specific installation requirements of the damper UL listing.
K. Install heating coils, cooling coils, air filters, dampers, and all other duct-mounted accessories in air ducts where indicated on Drawings.
L. Protect duct interiors from moisture, construction debris and dust, and other foreign materials both before and after installation. Comply with SMACNA's "IAQ Guidelines for Occupied Buildings Under Construction," Appendix G, "Duct Cleanliness for New Construction Guidelines." M. Elbows: Use long-radius elbows wherever they fit.
1. Fabricate 90-degree rectangular mitered elbows to include turning vanes.
2. Fabricate 90-degree round elbows with a minimum of three segments for 12 inches and smaller and a minimum of five segments for 14 inches and larger.
N. Branch Connections: Use lateral or conical branch connections.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 7
3.2 INSTALLATION OF EXPOSED DUCTWORK
A. Protect ducts exposed in finished spaces from being dented, scratched, or damaged.
B. Trim duct sealants flush with metal. Create a smooth and uniform exposed bead. Do not use twopart tape sealing system.
C. Grind welds to provide smooth surface free of burrs, sharp edges, and weld splatter. When welding stainless steel with a No. 3 or 4 finish, grind the welds flush, polish the exposed welds, and treat the welds to remove discoloration caused by welding.
D. Maintain consistency, symmetry, and uniformity in arrangement and fabrication of fittings, hangers and supports, duct accessories, and air outlets.
E. Repair or replace damaged sections and finished work that does not comply with these requirements.
3.3 DUCT SEALING
A. Seal ducts for duct static-pressure, seal classes, and leakage classes specified in "Duct Schedule" Article in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
B. Seal ducts at a minimum to the following seal classes in accordance with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible":
1. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible."
2. Outdoor, Supply-Air Ducts: Seal Class A.
3. Outdoor, Exhaust Ducts: Seal Class C.
4. Outdoor, Return-Air Ducts: Seal Class C.
5. Unconditioned Space, Supply-Air Ducts in Pressure Classes 2-Inch wg and Lower: Seal Class B.
6. Unconditioned Space, Supply-Air Ducts in Pressure Classes Higher Than 2-Inch wg: Seal Class A.
7. Unconditioned Space, Exhaust Ducts: Seal Class C.
8. Unconditioned Space, Return-Air Ducts: Seal Class B.
9. Conditioned Space, Supply-Air Ducts in Pressure Classes 2-Inch wg and Lower: Seal Class C.
10. Conditioned Space, Supply-Air Ducts in Pressure Classes Higher Than 2-Inch wg: Seal Class B.
11. Conditioned Space, Exhaust Ducts: Seal Class B.
12. Conditioned Space, Return-Air Ducts: Seal Class C.
3.4 HANGER AND SUPPORT INSTALLATION
A. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Chapter 5, "Hangers and Supports."
B. Building Attachments: Concrete inserts, powder-actuated fasteners, or structural-steel fasteners appropriate for construction materials to which hangers are being attached.
1. Where practical, install concrete inserts before placing concrete.
2. Install powder-actuated concrete fasteners after concrete is placed and completely cured.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 8
3. Use powder-actuated concrete fasteners for standard-weight aggregate concretes or for slabs more than 4 inches thick.
4. Do not use powder-actuated concrete fasteners for lightweight-aggregate concretes or for slabs less than 4 inches thick.
5. Do not use powder-actuated concrete fasteners for seismic restraints. Coordinate with Section 230548 "Vibration and Seismic Controls for HVAC." C. Hanger Spacing: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Table 5-1, "Rectangular Duct Hangers Minimum Size," and Table 5-2, "Minimum Hanger Sizes for Round Duct," for maximum hanger spacing; install hangers and supports within 24 inches of each elbow and within 48 inches of each branch intersection.
D. Hangers Exposed to View: Threaded rod and angle or channel supports.
E. Support vertical ducts with steel angles or channel secured to the sides of the duct with welds, bolts, sheet metal screws, or blind rivets; support at each floor and at a maximum intervals of 16 feet.
F. Install upper attachments to structures. Select and size upper attachments with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
3.5 SEISMIC-RESTRAINT-DEVICE INSTALLATION
A. See Section 230548 "Vibration and Seismic Controls for HVAC" for seismic restraint installation requirements.
3.6 DUCTWORK CONNECTIONS
A. Make connections to equipment with flexible connectors complying with Section 233300 "Air Duct Accessories."
B. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for branch, outlet and inlet, and terminal unit connections.
3.7 PAINTING
A. Paint interior of metal ducts that are visible through registers and grilles and that do not have duct liner. Apply one coat of flat, black, latex paint over a compatible galvanized-steel primer. Paint materials and application requirements are specified in Section 099113 "Exterior Painting" and Section 099123 "Interior Painting."
3.8 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Leakage Tests:
1. Comply with SMACNA's "HVAC Air Duct Leakage Test Manual." Submit a test report for each test.
2. Test the following systems:
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 9
a. Ducts with a Pressure Class Higher Than 3-Inch wg (750 Pa): Test representative duct sections totaling no less than 25 percent of total installed duct area for each designated pressure class.
b. Supply Ducts with a Pressure Class of 2-Inch wg or Higher: Test representative duct sections totaling no less than 50 percent of total installed duct area for each designated pressure class.
c. Return Ducts with a Pressure Class of 2-Inch wg or Higher: Test representative duct sections totaling no less than 50 percent of total installed duct area for each designated pressure class.
d. Exhaust Ducts with a Pressure Class of 2-Inch wg or Higher: Test representative duct sections totaling no less than 50 percent of total installed duct area for each designated pressure class.
e. Outdoor-Air Ducts with a Pressure Class of 2-Inch wg or Higher: Test representative duct sections totaling no less than 50 percent of total installed duct area for each designated pressure class.
3. Disassemble, reassemble, and seal segments of systems to accommodate leakage testing and for compliance with test requirements.
4. Testing of each duct section is to be performed with access doors, coils, filters, dampers, and other duct-mounted devices in place as designed. No devices are to be removed or blanked off so as to reduce or prevent additional leakage.
5. Test for leaks before applying external insulation.
6. Conduct tests at static pressures equal to maximum design pressure of system or section being tested. If static-pressure classes are not indicated, test system at maximum system design pressure. Do not pressurize systems above maximum design operating pressure.
7. Give seven days' advance notice for testing.
C. Duct System Cleanliness Tests:
1. Visually inspect duct system to ensure that no visible contaminants are present.
2. Test sections of metal duct system, chosen randomly by Owner, for cleanliness in accordance with "Description of Method 3 - NADCA Vacuum Test" in NADCA ACR, "Assessment, Cleaning and Restoration of HVAC Systems." a. Acceptable Cleanliness Level: Net weight of debris collected on the filter media is to not exceed 0.75 mg/100 sq. cm.
D. Duct system will be considered defective if it does not pass tests and inspections.
E. Prepare test and inspection reports.
3.9 DUCT CLEANING
A. Clean new duct system(s) before testing, adjusting, and balancing.
B. Use duct cleaning methodology as indicated in NADCA ACR.
C. Use service openings for entry and inspection.
1. Provide openings with access panels appropriate for duct static-pressure and leakage class at dampers, coils, and any other locations where required for inspection and cleaning access. Provide insulated panels for insulated or lined duct. Patch insulation and liner as recommended by duct liner manufacturer. Comply with Section 233300 "Air Duct Accessories" for access panels and doors.
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 10
2. Disconnect and reconnect flexible ducts as needed for cleaning and inspection.
3. Remove and reinstall ceiling to gain access during the cleaning process.
D. Particulate Collection and Odor Control:
1. When venting vacuuming system inside the building, use HEPA filtration with 99.97 percent collection efficiency for 0.3-micron-size (or larger) particles.
2. When venting vacuuming system to outdoors, use filter to collect debris removed from HVAC system, and locate exhaust downwind and away from air intakes and other points of entry into building.
E. Clean the following components by removing surface contaminants and deposits:
1. Air outlets and inlets (registers, grilles, and diffusers).
2. Supply, return, and exhaust fans including fan housings, plenums (except ceiling supply and return plenums), scrolls, blades or vanes, shafts, baffles, dampers, and drive assemblies.
3. Air-handling unit internal surfaces and components including mixing box, coil section, air wash systems, spray eliminators, condensate drain pans, humidifiers and dehumidifiers, filters and filter sections, and condensate collectors and drains.
4. Coils and related components.
5. Return-air ducts, dampers, actuators, and turning vanes except in ceiling plenums and mechanical equipment rooms.
6. Supply-air ducts, dampers, actuators, and turning vanes.
7. Dedicated exhaust and ventilation components and makeup air systems.
F. Mechanical Cleaning Methodology:
1. Clean metal duct systems using mechanical cleaning methods that extract contaminants from within duct systems and remove contaminants from building.
2. Use vacuum-collection devices that are operated continuously during cleaning. Connect vacuum device to downstream end of duct sections so areas being cleaned are under negative pressure.
3. Use mechanical agitation to dislodge debris adhered to interior duct surfaces without damaging integrity of metal ducts, duct liner, or duct accessories.
4. Clean fibrous-glass duct liner with HEPA vacuuming equipment; do not permit duct liner to get wet. Replace fibrous-glass duct liner that is damaged, deteriorated, or delaminated or that has friable material, mold, or fungus growth.
5. Clean coils and coil drain pans in accordance with NADCA ACR. Keep drain pan operational. Rinse coils with clean water to remove latent residues and cleaning materials; comb and straighten fins.
6. Provide drainage and cleanup for wash-down procedures.
7. Antimicrobial Agents and Coatings: Apply EPA-registered antimicrobial agents if fungus is present. Apply antimicrobial agents in accordance with manufacturer's written instructions after removal of surface deposits and debris.
3.10 STARTUP
A. Air Balance: Comply with requirements in Section 230593 "Testing, Adjusting, and Balancing for HVAC."
For Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 11
3.11 DUCT SCHEDULE
A. Fabricate ducts with galvanized sheet steel except as otherwise indicated and as follows:
1. Fabricate all ducts to achieve SMACNA pressure class, seal class, and leakage class as indicated below.
2. Underground Ducts: Concrete-encased, galvanized sheet steel.
B. Exhaust Ducts:
1. Ducts Connected to Fans Exhausting (ASHRAE 62.1, Class 1 and 2) Air:
a. Pressure Class: Negative 1-inch wg
b. Minimum SMACNA Seal Class: A
c. SMACNA Leakage Class for Rectangular: 4
d. SMACNA Leakage Class for Round and Flat Oval: 4
C. Intermediate Reinforcement:
1. Galvanized-Steel Ducts: Galvanized steel
2. Stainless Steel Ducts:
a. Exposed to Airstream: Match duct material.
b. Not Exposed to Airstream: Galvanized
3. Aluminum Ducts: Aluminum or galvanized steel coated with zinc chromate D. Elbow Configuration:
1. Rectangular Duct - Requirements for Different Velocities: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-2, "Rectangular Elbows." a. Velocity 1000 fpm or Lower:
1) Radius Type RE 1 with minimum 0.5 radius-to-diameter ratio. 2) Mitered Type RE 4 without vanes.
b. Velocity 1000 to 1500 fpm:
1) Radius Type RE 1 with minimum 1.0 radius-to-diameter ratio. 2) Radius Type RE 3 with minimum 0.5 radius-to-diameter ratio and two vanes. 3) Mitered Type RE 2 with vanes complying with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-3, "Vanes and Vane Runners," and Figure 4-4, "Vane Support in Elbows."
c. Velocity 1500 fpm or Higher:
1) Radius Type RE 1 with minimum 1.5 radius-to-diameter ratio. 2) Radius Type RE 3 with minimum 1.0 radius-to-diameter ratio and two vanes. 3) Mitered Type RE 2 with vanes complying with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-3, "Vanes and Vane Runners," and Figure 4-4, "Vane Support in Elbows."
2. Rectangular Duct Requirements for All Velocities: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure
For
4-2, "Rectangular Elbows."
Council Approval
Not for Bidding
ROSEVILLE AQUATIC COMPLEX RENOVATION
May 4, 2026
METAL DUCTS
233113 - 12
a. Radius Type RE 1 with minimum 1.5 radius-to-diameter ratio. b. Radius Type RE 3 with minimum 1.0 radius-to-diameter ratio and two vanes. c. Mitered Type RE 2 with vanes complying with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-3, "Vanes and Vane Runners," and Figure 4-4, "Vane Support in Elbows."
3. Round Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-4, "Round Duct Elbows."
a. Minimum Radius-to-Diameter Ratio and Elbow Segments: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Table 3-1, "Mitered Elbows." Elbows with less than 90-degree change of direction have proportionately fewer segments.
1) Velocity 1000 fpm or Lower: 0.5 radius-to-diameter ratio and three segments for 90-degree elbow.
2) Velocity 1000 to 1500 fpm: 1.0 radius-to-diameter ratio and four segments for 90-degree elbow.
3) Velocity 1500 fpm or Higher: 1.5 radius-to-diameter ratio and five segments for 90-degree elbow.
4) Radius-to Diameter Ratio: 1.5.
b. Round Elbows, 12 Inches and Smaller in Diameter: Stamped or pleated. c. Round Elbows, 14 Inches and Larger in Diameter: Standing seam E. Branch Configuration:
1. Rectangular Duct: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 4-6, "Branch Connection."
a. Rectangular Main to Rectangular Branch: 45-degree entry. b. Rectangular Main to Round Branch: Conical spin in.
2. Round and Flat Oval: Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible," Figure 3-5, "90 Degree Tees and Laterals," and Figure 3-6, "Conical Tees." Saddle taps are permitted in existing duct.
a. Velocity 1000 fpm or Lower: 90-degree tap.
b. Velocity 1000 to 1500 fpm: Conical tap.
c. Velocity 1500 fpm or Higher: 45-degree lateral.
END OF SECTION 233113