Issuing Policies of Chicago Title Insurance Company
Order No.: FBSC2600762
TO:
City of Santa Ana
20 Civic Center Plaza
Santa Ana, CA 92701
Attn: Taig Higgins
Ref No.:
Title Officer: Jordan Curiel
Email: [email protected]
Phone No.: 213-488-4371
Fax No.: 213-612-4171
Escrow Office:
Escrow Officer:
Email:
Address:
Phone No.:
Fax No.:
Loan No.:
Property: 717 W Santa Ana Blvd, Santa Ana, CA 92701-4512 In response to the application for a policy of title insurance referenced herein, Chicago Title Company hereby reports that it is prepared to issue, or cause to be issued, as of the date hereof, a policy or policies of title insurance describing the land and the estate or interest therein hereinafter set forth, insuring against loss which may be sustained by reason of a defect, lien or encumbrance not shown or referred to as an exception herein or not excluded from coverage pursuant to the printed Schedules, Exclusions from Coverage, and Conditions of said policy forms.
With respect to any contemplated owner's policy, the printed Exceptions and Exclusions from the coverage and Limitations on Covered Risks of said policy or policies are set forth in Attachment One. The policy to be issued may contain an arbitration clause. When the Amount of Insurance is less than that set forth in the arbitration clause, all arbitrable matters shall be arbitrated at the option of either the Company or the Insured as the exclusive remedy of the parties. Limitations on Covered Risks applicable to the CLTA/ALTA Homeowner's Policy of Title Insurance, which establish a Deductible Amount and a Maximum Dollar Limit of Liability for certain coverages are also set forth in Attachment One. Copies of the policy forms should be read. They are available from the office which issued this report.
Please read the exceptions shown or referred to herein and the exceptions and exclusions set forth in Attachment One of this report carefully. The exceptions and exclusions are meant to provide you with notice of matters which are not covered under the terms of the title insurance policy and should be carefully considered.
It is important to note that this preliminary report is not a written representation as to the condition of title and may not list all liens, defects, and encumbrances affecting title to the land.
This report (and any supplements or amendments hereto) is issued solely for the purpose of facilitating the issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed prior to the issuance of a policy of title insurance, a binder or commitment should be requested.
Countersigned By:
Authorized Officer or Agent
Joe Goodman
City Council 21 – 64 5/5/2026
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
Effective date: January 12, 2026 at 07:30 AM, Amendment 1 Reissued: January 26, 2026 The form of Policy or Policies of Title Insurance contemplated by this Report is:
1. The estate or interest in the Land hereinafter described or referred to covered by this Report is:
Fee Simple
2. Title to said estate or interest at the date hereof is vested in:
County of Orange
3. The Land referred to in this Report is described as follows:
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF
City Council 21 – 65 5/5/2026
EXHIBIT A
Legal Description
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
For APN/Parcel ID(s): Portion of 008-067-45
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA AND IS DESCRIBED AS FOLLOWS:
THOSE PORTIONS OF LOTS 1, 8, 9 AND 10 IN BLOCK F OF ROSS ADDITION TO SANTA ANA, IN THE CITY OF SANTA ANA, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON MAP RECORDED IN BOOK 3, PAGES 534 AND 535 OF MISCELLANEOUS RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF LOS ANGELES COUNTY, AND THOSE PORTIONS OF PARTON STREET AND FIFTH STREET, VACATED PER RESOLUTION NO. 69-27 OF THE CITY OF SANTA ANA, RECORDED FEBRUARY 19, 1969, IN BOOK 8878, PAGES 863, OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY, DESCRIBED AS FOLLOWS:
THE EAST 42.40 FEET OF SAID LOTS 1 AND 10, EXCEPTING THEREFROM THE SOUTH 60 FEET OF SAID LOT 10; TOGETHER WITH THE SOUTH 60 FEET OF SAID LOTS 9 AND 10, AND THE SOUTH 60 FEET OF THE EAST 37.83 FEET OF SAID LOT 8;
ALSO TOGETHER WITH THE WEST ONE-HALF OF PARTON STREET (60-FEET WIDE) BOUNDED NORTHERLY BY THE EASTERLY PROLONGATION OF THE NORTH LINE OF SAID LOT 1, AND SOUTHERLY BY THE EASTERLY PROLONGATION OF THE SOUTH LINE OF SAID LOT 10;
ALSO TOGETHER WITH THE NORTH ONE-HALF OF FIFTH STREET (60-FEET WIDE), BOUNDED EASTERLY BY
THE FORMER CENTERLINE OF SAID PARTON STREET, AND WESTERLY BY THE SOUTHERLY PROLONGATION OF THE WEST LINE OF THE AFORESAID EAST 37.83 FEET OF SAID LOT 8.
City Council 21 – 66 5/5/2026
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
EXCEPTIONS
At the date hereof, items to be considered and exceptions to coverage in addition to the printed exceptions and exclusions in said policy form would be as follows:
1. Property taxes, which are a lien not yet due and payable, including any assessments collected with taxes to be levied for the fiscal year 2026-2027.
2. There were no taxes levied for the fiscal year 2025-2026 as the property was vested in a public entity.
3. The lien of supplemental or escaped assessments of property taxes, if any, made pursuant to the provisions of Chapter 3.5 (commencing with Section 75) or Part 2, Chapter 3, Articles 3 and 4, respectively, of the Revenue and Taxation Code of the State of California as a result of the transfer of title to the vestee named in Schedule A or as a result of changes in ownership or new construction occurring prior to Date of Policy.
4. Water rights, claims or title to water, whether or not disclosed by the public records.
5. Easement(s) for the purpose(s) shown below and rights incidental thereto as reserved in a document; Purpose: public utilities
Recording Date: February 19, 1969
Recording No.: Book 8878, Page 863, Official Records
Affects: that portion of said land described therein
6. Intentionally deleted.
7. A notice that said Land is included within a project area of the Redevelopment Agency shown below, and that proceedings for the redevelopment of said project have been instituted under the Redevelopment Law (such redevelopment to proceed only after the adoption of the redevelopment plan) as disclosed by a document Recording Date: July 18, 1973
Recording No.: Book 10807, Page 9, Official Records
Redevelopment Agency: City of Santa Ana Redevelopment Agency An agreement to modify the terms and provisions of the said document, as therein provided Recording Date: October 20, 2004
Recording No.: 2004-000948360 of Official Records
An agreement to modify the terms and provisions of the said document, as therein provided Recording Date: December 20, 2007
Recording No.: 2007-000744244 of Official Records
8. Intentionally deleted.
9. Intentionally deleted.
10. Please be advised that our search did not disclose any open Deeds of Trust of record. If you should have knowledge of any outstanding obligation, please contact the Title Department immediately for further review prior to closing.
11. Matters which may be disclosed by an inspection and/or by a correct ALTA/NSPS Land Title Survey of said Land that is satisfactory to the Company, and/or by inquiry of the parties in possession thereof.
City Council 21 – 67 5/5/2026
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
12. Any easements not disclosed by the public records as to matters affecting title to real property, whether or not said easements are visible and apparent.
13. Any rights of the parties in possession of a portion of, or all of, said Land, which rights are not disclosed by the public records.
The Company will require, for review, a full and complete copy of any unrecorded agreement, contract, license and/or lease, together with all supplements, assignments and amendments thereto, before issuing any policy of title insurance without excepting this item from coverage.
The Company reserves the right to except additional items and/or make additional requirements after reviewing said documents.
END OF EXCEPTIONS
PLEASE REFER TO THE "INFORMATIONAL NOTES" AND "REQUIREMENTS" SECTIONS WHICH FOLLOW FOR INFORMATION NECESSARY TO COMPLETE THIS TRANSACTION.
City Council 21 – 68 5/5/2026
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
REQUIREMENTS
1. Unrecorded matters which may be disclosed by an Owner’s Affidavit or Declaration. A form of the Owner’s Affidavit/Declaration is attached to this Preliminary Report/Commitment. This Affidavit/Declaration is to be completed by the record owner of the land and submitted for review prior to the closing of this transaction. Your prompt attention to this requirement will help avoid delays in the closing of this transaction. Thank you.
The Company reserves the right to add additional items or make further requirements after review of the requested Affidavit/Declaration.
2. This Company will require evidence of compliance with the statutory limitations incident to the governmental agency named below, with reference to any conveyance of an interest in the Land this Company will be asked to record and/or rely upon in the issuance of any form of title insurance.
Governmental agency: County of Orange
END OF REQUIREMENTS
City Council 21 – 69 5/5/2026
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
INFORMATIONAL NOTES
1. Note: None of the items shown in this report will cause the Company to decline to attach ALTA Endorsement Form 9 to an Extended Coverage Loan Policy, when issued.
2. Note: The Company is not aware of any matters which would cause it to decline to attach CLTA Endorsement Form 116 indicating that there is located on said Land a public facility, known as 717 W Santa Ana Blvd, Santa Ana, CA, to an Extended Coverage Loan Policy.
3. Notice: Please be aware that due to the conflict between federal and state laws concerning the cultivation, distribution, manufacture or sale of marijuana, the Company is not able to close or insure any transaction involving Land that is associated with these activities.
4. Pursuant to Government Code Section 27388.1, as amended and effective as of 1-1-2018, a Documentary Transfer Tax (DTT) Affidavit may be required to be completed and submitted with each document when DTT is being paid or when an exemption is being claimed from paying the tax. If a governmental agency is a party to the document, the form will not be required. DTT Affidavits may be available at a Tax Assessor-County Clerk-Recorder.
5. Note: The policy of title insurance will include an arbitration provision. The Company or the insured may demand arbitration. Arbitrable matters may include, but are not limited to, any controversy or claim between the Company and the insured arising out of or relating to this policy, any service of the Company in connection with its issuance or the breach of a policy provision or other obligation. Please ask your escrow or title officer for a sample copy of the policy to be issued if you wish to review the arbitration provisions and any other provisions pertaining to your Title Insurance coverage.
City Council 21 – 70 5/5/2026
CHICAGO TITLE COMPANY
PRELIM NO. FBSC2600762
AMENDMENT 1
CLTA Preliminary Report Form (02/03/2023) Printed: 04.06.26 @ 05:07 PM
6. The following Exclusion(s) are added to preliminary reports, commitments and will be included as an endorsement in the following policies:
A. 2006 ALTA Owner’s Policy (06-17-06).
6. Defects, liens, encumbrances, adverse claims, notices, or other matters not appearing in the Public Records but that would be disclosed by an examination of any records maintained by or on behalf of a Tribe or on behalf of its members.
B. 2006 ALTA Loan Policy (06-17-06)
8. Defects, liens, encumbrances, adverse claims, notices, or other matters not appearing in the Public Records but that would be disclosed by an examination of any records maintained by or on behalf of a Tribe or on behalf of its members.
9. Any claim of invalidity, unenforceability, or lack of priority of the lien of the Insured Mortgage based on the application of a Tribe’s law resulting from the failure of the Insured Mortgage to specify State law as the governing law with respect to the lien of the Insured Mortgage.
C. ALTA Homeowner’s Policy of Title Insurance (12-02-13) and CLTA Homeowner's Policy of Title Insurance (12-02-13).
10. Defects, liens, encumbrances, adverse claims, notices, or other matters not appearing in the Public Records but that would be disclosed by an examination of any records maintained by or on behalf of a Tribe or on behalf of its members.
D. ALTA Expanded Coverage Residential Loan Policy - Assessments Priority (04-02-15).
12. Defects, liens, encumbrances, adverse claims, notices, or other matters not appearing in the Public Records but that would be disclosed by an examination of any records maintained by or on behalf of a Tribe or on behalf of its members.
13. Any claim of invalidity, unenforceability, or lack of priority of the lien of the Insured Mortgage based on the application of a Tribe’s law resulting from the failure of the Insured Mortgage to specify State law as the governing law with respect to the lien of the Insured Mortgage.
E. CLTA Standard Coverage Policy 1990 (11-09-18).
7. Defects, liens, encumbrances, adverse claims, notices, or other matters not appearing in the public records but that would be disclosed by an examination of any records maintained by or on behalf of a tribe or on behalf of its members.
8. Any claim of invalidity, unenforceability, or lack of priority of the lien of the insured mortgage based on the application of a tribe’s law resulting from the failure of the insured mortgage to specify state law as the governing law with respect to the lien of the insured mortgage.
7. Note: There are NO conveyances affecting said Land recorded within 24 months of the date of this report.
END OF INFORMATIONAL NOTES
City Council 21 – 71 5/5/2026
Wire Fraud Alert Page 9
Original Effective Date: 5/11/2017
Current Version Date: 5/11/2017 FBSC2600762 - WIRE0016 (DSI Rev. 12/07/17) TM and © Fidelity National Financial, Inc. and/or an affiliate. All rights reserved
WIRE FRAUD ALERT
This Notice is not intended to provide legal or professional advice.
If you have any questions, please consult with a lawyer.
All parties to a real estate transaction are targets for wire fraud and many have lost hundreds of thousands of dollars because they simply relied on the wire instructions received via email, without further verification. If funds are to be wired in conjunction with this real estate transaction, we strongly recommend verbal verification of wire instructions through a known, trusted phone number prior to sending funds.
In addition, the following non-exclusive self-protection strategies are recommended to minimize exposure to possible wire fraud.
NEVER RELY on emails purporting to change wire instructions. Parties to a transaction rarely change wire instructions in the course of a transaction.
ALWAYS VERIFY wire instructions, specifically the ABA routing number and account number, by calling the party who sent the instructions to you. DO NOT use the phone number provided in the email containing the instructions, use phone numbers you have called before or can otherwise verify. Obtain the number of relevant parties to the transaction as soon as an escrow account is opened. DO NOT send an email to verify as the email address may be incorrect or the email may be intercepted by the fraudster. USE COMPLEX EMAIL PASSWORDS that employ a combination of mixed case, numbers, and symbols. Make your passwords greater than eight (8) characters. Also, change your password often and do NOT reuse the same password for other online accounts.
USE MULTI-FACTOR AUTHENTICATION for email accounts. Your email provider or IT staff may have specific instructions on how to implement this feature.
For more information on wire-fraud scams or to report an incident, please refer to the following links:
Federal Bureau of Investigation: Internet Crime Complaint Center:
http://www.fbi.gov http://www.ic3.gov
City Council 21 – 72 5/5/2026
Copyright © 2026. Fidelity National Financial, Inc. All Rights Reserved.
Privacy Statement Printed: 04.06.26 @ 05:07 PM
SCA0003004.doc Page 10 of 20 CA-CT-FBSC-02180.054674-FBSC2600762
FIDELITY NATIONAL FINANCIAL
CALIFORNIA PRIVACY NOTICE
Fidelity National Financial, Inc. and its majority-owned subsidiary companies (collectively, "FNF," "our," or "we") respect and are committed to protecting your privacy. This California Privacy Notice explains how we collect, use, and disclose Personal Information, when and to whom we disclose such information, and the rights you, as a California resident ("Consumer"), have regarding your Personal Information ("California Privacy Rights"). "Personal Information" means information that identifies, relates to, describes, and is reasonably capable of being associated with, or could reasonably be linked, directly or indirectly, with a particular consumer or household. If FNF has collected, used, or disclosed your Personal Information in relation to a job application or employment, independent contractor, officer, owner, or director relationship with FNF, FNF's practices are discussed in our Notice at Collection for Prospective Employees, available at Prospective California Employees.
Some subsidiaries maintain separate California Privacy Notices or privacy statements. If a subsidiary has a separate California Privacy Notice, it will be available on the subsidiary's website, and this California Privacy Notice does not apply.
Collection of categories of Personal Information:
In the preceding twelve (12) months FNF has collected, and will continue to collect, the following categories of Personal Information from you:
Identifiers such as name, address, telephone number, IP address, email address, account name, social security number, driver's license number, state identification card, passport number, financial information, date of birth, or other similar identifiers;
Characteristics of protected classifications under California or Federal law; Commercial information, including records of personal property, products or services purchased, or other purchasing or consuming histories;
Internet or other electronic network activity information including, but not limited to browsing history on FNF websites and information regarding a Consumer's interaction with an FNF website; Geolocation data;
Unique biometric data used to authenticate a specific individual such as a fingerprint, retina, or iris image; Professional or employment information;
Education Information.
This Personal Information is collected from the following sources:
Information we receive from you on applications or other forms; Information about your transactions with FNF, our affiliates, or others; Information we receive from consumer reporting agencies and/or governmental entities, either directly from these entities, or from internet service providers, data analytics providers, and social networks; Information from the use of our websites and mobile applications; Information we receive directly from you related to doing business with us.
This Personal Information is collected for the following business purposes:
To provide products and services to you or in connection with a transaction involving you; To perform a contract between FNF and the Consumer;
To improve our products and services;
To comply with legal obligations;
To detect and protect against fraudulent or illegal activity; To communicate with you about FNF or our affiliates;
To maintain an account with FNF or our affiliates;
City Council 21 – 73 5/5/2026
Copyright © 2026. Fidelity National Financial, Inc. All Rights Reserved.
Privacy Statement Printed: 04.06.26 @ 05:07 PM
SCA0003004.doc Page 11 of 20 CA-CT-FBSC-02180.054674-FBSC2600762 To maintain the security of our systems, tools, accounts, and applications; To verify and authenticate identities and credentials; To provide, support, personalize, and develop our websites, products, and services; To directly market our products to consumers;
As described to you when collecting your Personal Information or as otherwise set forth in the California Consumer Privacy Act.
Disclosures of Personal Information for a business purpose:
In the preceding twelve (12) months FNF has disclosed, and will continue to disclose, the categories of Personal Information listed above for a business purpose. We may disclose Personal Information for a business purpose to the following categories of third parties:
FNF affiliates and subsidiaries;
Non-affiliated third parties, with your prior consent; Businesses in connection with the sale or other disposition of all or part of the FNF business and/or assets; Service Providers and non-affiliated third parties such as data analytics providers; Law enforcement or authorities in connection with an investigation, or in response to a subpoena or court order.
Sale of Personal Information:
In the preceding twelve (12) months, FNF has not sold or shared Personal Information. FNF does not sell or share Personal Information.
Retention Periods:
Due to the breadth and variety of data collected by FNF, it is not possible for us to provide you with a comprehensive list of timeframes during which we retain each category of Personal Information. FNF retains categories of information as reasonably necessary to satisfy the purpose for which we collect the information. This time period varies depending on the purpose for which we collected the information, the nature and frequency of our interactions and relationship with you, whether we have a legal basis to continue retaining the information, industry practices, the value and sensitivity of the information, and state and federal recordkeeping requirements.
Personal Information of minors:
FNF does not knowingly collect the Personal Information of minors. FNF does not sell or share the information of consumers under sixteen (16) years of age.
Sensitive Personal Information:
FNF does not use or disclose sensitive Personal Information for any purposes other than those specified in the California Consumer Privacy Act.
Right to know:
Consumers have a right to know about Personal Information collected, used, disclosed, shared, or sold, including the categories of such Personal Information, as well as the purpose for such collection, use, disclosure, sharing, or selling, categories of third parties to whom Personal Information is disclosed, shared or sold, and the specific pieces of Personal Information collected about the consumer. Consumers have the right to request FNF disclose what Personal Information it collected, used, and disclosed in the past twelve (12) months.
Right to request deletion:
Consumers have a right to request the deletion of their Personal Information, subject to certain exceptions.
City Council 21 – 74 5/5/2026
Copyright © 2026. Fidelity National Financial, Inc. All Rights Reserved.
Privacy Statement Printed: 04.06.26 @ 05:07 PM
SCA0003004.doc Page 12 of 20 CA-CT-FBSC-02180.054674-FBSC2600762 Right to Correct:
Consumers have the right to correct inaccurate Personal Information.
Right to non-discrimination:
Consumers have a right not to be discriminated against because of exercising their consumer privacy rights. We will not discriminate against Consumers for exercising any of their California Privacy Rights.
Privacy Requests:
To exercise any of your California Privacy Rights, or if acting as an authorized agent on behalf of another individual, please visit California Privacy Request (FNF.com/California-privacy), call us Toll Free at 888-413-1748, or write to the address at the end of this notice.
Upon making a California Privacy Request, FNF will verify the consumer's identity by requiring an account, loan, escrow number, or other identifying information from the consumer.
The above-rights are subject to any applicable rights and obligations including both Federal and California exemptions rendering FNF, or Personal Information collected by FNF, exempt from certain CCPA requirements.
A Consumer may use an Authorized Agent to submit any CCPA request. Authorized agents’ requests will be processed like any other CCPA request, but FNF will also require the Consumer provide the agent written permission to make the request and verify his or her identity with FNF.
FNF website services for mortgage loans:
Certain FNF companies provide services to mortgage loan servicers, including hosting websites that collect customer information on behalf of mortgage loan servicers (the "Service Websites"). The Service Websites may contain links to both this Privacy Notice and the mortgage loan servicer or lender's privacy notice. The sections of this Privacy Notice describing the categories, sources, and uses of your Personal Information do not apply to the Service Websites. The mortgage loan servicer or lender's privacy notice governs use, disclosure, and access to your Information. FNF does not share Information collected through the Service Websites, except (1) as required or authorized by contract with the mortgage loan servicer or lender, or (2) as required by law or in the good-faith belief that such disclosure is necessary to comply with a legal process or applicable law, to enforce this Privacy Notice, or to protect the rights, property, or safety of FNF or the public.
California Privacy Notice - Effective Date:
This California Privacy Notice was last updated on January 1, 2026.
Contact for more information:
For questions or concerns about FNF's California Privacy Notice and privacy practices, or to exercise any of your California Privacy Rights, please visit California Privacy (FNF.com/California-privacy), call Toll Free 888-413-1748, or contact us by mail at the below address.
Fidelity National Financial, Inc.
601 Riverside Avenue
Jacksonville, Florida 32204
Attn: Chief Privacy Officer
City Council 21 – 75 5/5/2026
ATTACHMENT ONE
Attachment One (11/04/22)
CALIFORNIA LAND TITLE ASSOCIATION
STANDARD COVERAGE POLICY - 1990 (11-09-18)
EXCLUSIONS FROM COVERAGE
The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of:
1. (a) Any law, ordinance or governmental regulation (including but not limited to building or zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien, or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy.
2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without knowledge.
3. Defects, liens, encumbrances, adverse claims or other matters:
(a) whether or not recorded in the public records at Date of Policy, but created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the insured mortgage or for the estate or interest insured by this policy.
4. Unenforceability of the lien of the insured mortgage because of the inability or failure of the insured at Date of Policy, or the inability or failure of any subsequent owner of the indebtedness, to comply with the applicable doing business laws of the state in which the land is situated.
5. Invalidity or unenforceability of the lien of the insured mortgage, or claim thereof, which arises out of the transaction evidenced by the insured mortgage and is based upon usury or any consumer credit protection or truth in lending law.
6. Any claim, which arises out of the transaction vesting in the insured the estate or interest insured by this policy or the transaction creating the interest of the insured lender, by reason of the operation of federal bankruptcy, state insolvency or similar creditors' rights laws.
EXCEPTIONS FROM COVERAGE - SCHEDULE B, PART I
This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of:
1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records.
Proceedings by a public agency which may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the public records.
2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of the land or which may be asserted by persons in possession thereof.
3. Easements, liens or encumbrances, or claims thereof, not shown by the public records.
4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by the public records.
5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b) or (c) are shown by the public records.
6. Any lien or right to a lien for services, labor or material unless such lien is shown by the public records at Date of Policy.
EXCEPTIONS FROM COVERAGE - SCHEDULE B, PART II
(Variable exceptions such as taxes, easements, CC&R’s, etc., are inserted here) City Council 21 – 76 5/5/2026
ATTACHMENT ONE
(CONTINUED)
Attachment One (11/04/22)
CALIFORNIA LAND TITLE ASSOCIATION
STANDARD COVERAGE OWNER'S POLICY (02-04-22)
EXCLUSIONS FROM COVERAGE
The following matters are excluded from the coverage of this policy, and the Company will not pay loss or damage, costs, attorneys’ fees, or expenses that arise by reason of:
1. a. any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) that restricts, regulates, prohibits, or relates to:
i. the occupancy, use, or enjoyment of the Land;
ii. the character, dimensions, or location of any improvement on the Land; iii. the subdivision of land; or
iv. environmental remediation or protection.
b. any governmental forfeiture, police, regulatory, or national security power. c. the effect of a violation or enforcement of any matter excluded under Exclusion 1.a. or 1.b.
Exclusion 1 does not modify or limit the coverage provided under Covered Risk 5 or 6.
2. Any power of eminent domain. Exclusion 2 does not modify or limit the coverage provided under Covered Risk 7.
3. Any defect, lien, encumbrance, adverse claim, or other matter:
a. created, suffered, assumed, or agreed to by the Insured Claimant; b. not Known to the Company, not recorded in the Public Records at the Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; c. resulting in no loss or damage to the Insured Claimant; d. attaching or created subsequent to the Date of Policy (Exclusion 3.d. does not modify or limit the coverage provided under Covered Risk 9 or 10); or
e. resulting in loss or damage that would not have been sustained if consideration sufficient to qualify the Insured named in Schedule A as a bona fide purchaser had been given for the Title at the Date of Policy.
4. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors’ rights law, that the transaction vesting the Title as shown in Schedule A is a:
a. fraudulent conveyance or fraudulent transfer;
b. voidable transfer under the Uniform Voidable Transactions Act; or c. preferential transfer:
i. to the extent the instrument of transfer vesting the Title as shown in Schedule A is not a transfer made as a contemporaneous exchange for new value; or
ii. for any other reason not stated in Covered Risk 9.b.
5. Any claim of a PACA-PSA Trust. Exclusion 5 does not modify or limit the coverage provided under Covered Risk 8.
6. Any lien on the Title for real estate taxes or assessments imposed or collected by a governmental authority that becomes due and payable after the Date of Policy.
Exclusion 6 does not modify or limit the coverage provided under Covered Risk 2.b. 7 Any discrepancy in the quantity of the area, square footage, or acreage of the Land or of any improvement to the Land.
EXCEPTIONS FROM COVERAGE
Some historical land records contain Discriminatory Covenants that are illegal and unenforceable by law. This policy treats any Discriminatory Covenant in a document referenced in Schedule B as if each Discriminatory Covenant is redacted, repudiated, removed, and not republished or recirculated. Only the remaining provisions of the document are excepted from coverage.
This policy does not insure against loss or damage and the Company will not pay costs, attorneys’ fees, or expenses resulting from the terms and conditions of any lease or easement identified in Schedule A, and the following matters:
PART I
1. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records.
2. Any facts, rights, interests, or claims that are not shown by the Public Records at Date of Policy but that could be (a) ascertained by an inspection of the Land, or (b) asserted by persons or parties in possession of the Land.
3. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records at Date of Policy.
4. Any encroachment, encumbrance, violation, variation, easement, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records at Date of Policy.
5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records.
6. Any lien or right to a lien for services, labor, material or equipment unless such lien is shown by the Public Records at Date of Policy.
7. Any claim to (a) ownership of or rights to minerals and similar substances, including but not limited to ores, metals, coal, lignite, oil, gas, uranium, clay, rock, sand, and gravel located in, on, or under the Land or produced from the Land, whether such ownership or rights arise by lease, grant, exception, conveyance, reservation, or otherwise; and (b) any rights, privileges, immunities, rights of way, and easements associated therewith or appurtenant thereto, whether or not the interests or rights excepted in (a) or (b) appear in the Public Records or are shown in Schedule B.
PART II
(Variable exceptions such as taxes, easements, CC&R’s, etc., are inserted here) City Council 21 – 77 5/5/2026
ATTACHMENT ONE
(CONTINUED)
Attachment One (11/04/22)
CLTA/ALTA HOMEOWNER'S POLICY OF TITLE INSURANCE (7-01-21)
EXCLUSIONS FROM COVERAGE
The following matters are excluded from the coverage of this policy and We will not pay loss or damage, costs, attorneys' fees, or expenses that arise by reason of:
1. a. any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) that restricts, regulates, prohibits, or relates to:
i. the occupancy, use, or enjoyment of the Land;
ii. the character, dimensions, or location of any improvement on the Land; iii. the subdivision of land; or
iv. environmental remediation or protection.
b. any governmental forfeiture, police, or regulatory, or national security power. c. the effect of a violation or enforcement of any matter excluded under Exclusion 1.a. or 1.b.
Exclusion 1 does not modify or limit the coverage provided under Covered Risk 8.a., 14, 15, 16, 18, 19, 20, 23, or 27.
2. Any power to take the Land by condemnation. Exclusion 2 does not modify or limit the coverage provided under Covered Risk 17.
3. Any defect, lien, encumbrance, adverse claim, or other matter:
a. created, suffered, assumed, or agreed to by You;
b. not Known to Us, not recorded in the Public Records at the Date of Policy, but Known to You and not disclosed in writing to Us by You prior to the date You became an Insured under this policy;
c. resulting in no loss or damage to You;
d. attaching or created subsequent to the Date of Policy (Exclusion 3.d. does not modify or limit the coverage provided under Covered Risk 5,
8.f., 25, 26, 27, 28, or 32); or
e. resulting in loss or damage that would not have been sustained if You paid consideration sufficient to qualify You as a bona fide purchaser of the Title at the Date of Policy.
4. Lack of a right:
a. to any land outside the area specifically described and referred to in Item 3 of Schedule A; and b. in any street, road, avenue, alley, lane, right-of-way, body of water, or waterway that abut the Land.
Exclusion 4 does not modify or limit the coverage provided under Covered Risk 11 or 21.
5. The failure of Your existing structures, or any portion of Your existing structures, to have been constructed before, on, or after the Date of Policy in accordance with applicable building codes. Exclusion 5 does not modify or limit the coverage provided under Covered Risk 14 or 15.
6. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights law, that the transfer of the Title to You is a:
a. fraudulent conveyance or fraudulent transfer;
b. voidable transfer under the Uniform Voidable Transactions Act; or c. preferential transfer:
i. to the extent the instrument of transfer vesting the Title as shown in Schedule A is not a transfer made as a contemporaneous exchange for new value; or
ii. for any other reason not stated in Covered Risk 30.
7. Contamination, explosion, fire, flooding, vibration, fracturing, earthquake, or subsidence.
8. Negligence by a person or an entity exercising a right to extract or develop oil, gas, minerals, groundwater, or any other subsurface substance.
9. Any lien on Your Title for real estate taxes or assessments, imposed or collected by a governmental authority that becomes due and payable after the Date of Policy. Exclusion 9 does not modify or limit the coverage provided under Covered Risk 8.a or 27.
10. Any discrepancy in the quantity of the area, square footage, or acreage of the Land or of any improvement to the Land.
LIMITATIONS ON COVERED RISKS
Your insurance for the following Covered Risks is limited on the Owner’s Coverage Statement as follows:
• For Covered Risk 16, 18, 19 and 21 Your Deductible Amount and Our Maximum Dollar Limit of Liability shown in Schedule A.
The deductible amounts and maximum dollar limits shown on Schedule A are as follows:
Your Deductible Amount Our Maximum Dollar Limit of Liability Covered Risk 16: 1.00% of Policy Amount Shown in Schedule A or $2,500.00 (whichever is less)
$ 10,000.00
Covered Risk 18: 1.00% of Policy Amount Shown in Schedule A or $5,000.00 (whichever is less)
$ 25,000.00
Covered Risk 19: 1.00% of Policy Amount Shown in Schedule A or $5,000.00 (whichever is less)
$ 25,000.00
Covered Risk 21: 1.00% of Policy Amount Shown in Schedule A or $2,500.00 (whichever is less)
$ 5,000.00
City Council 21 – 78 5/5/2026
ATTACHMENT ONE
(CONTINUED)
Attachment One (11/04/22)
CLTA/ALTA HOMEOWNER'S POLICY OF TITLE INSURANCE (12-02-13)
EXCLUSIONS
In addition to the Exceptions in Schedule B, You are not insured against loss, costs, attorneys' fees, and expenses resulting from:
1. Governmental police power, and the existence or violation of those portions of any law or government regulation concerning:
a. building;
b. zoning;
c. land use;
d. improvements on the Land;
e. land division; and
f. environmental protection.
This Exclusion does not limit the coverage described in Covered Risk 8.a., 14, 15, 16, 18, 19, 20, 23 or 27.
2. The failure of Your existing structures, or any part of them, to be constructed in accordance with applicable building codes. This Exclusion does not limit the coverage described in Covered Risk 14 or 15.
3. The right to take the Land by condemning it. This Exclusion does not limit the coverage described in Covered Risk 17.
4. Risks:
a. that are created, allowed, or agreed to by You, whether or not they are recorded in the Public Records; b. that are Known to You at the Policy Date, but not to Us, unless they are recorded in the Public Records at the Policy Date; c. that result in no loss to You; or
d. that first occur after the Policy Date - this does not limit the coverage described in Covered Risk 7, 8.e., 25, 26, 27 or 28.
5. Failure to pay value for Your Title.
6. Lack of a right:
a. to any land outside the area specifically described and referred to in paragraph 3 of Schedule A; and b. in streets, alleys, or waterways that touch the Land.
This Exclusion does not limit the coverage described in Covered Risk 11 or 21.
7. The transfer of the Title to You is invalid as a preferential transfer or as a fraudulent transfer or conveyance under federal bankruptcy, state insolvency, or similar creditors’ rights laws.
8. Contamination, explosion, fire, flooding, vibration, fracturing, earthquake or subsidence.
9. Negligence by a person or an Entity exercising a right to extract or develop minerals, water, or any other substances.
LIMITATIONS ON COVERED RISKS
Your insurance for the following Covered Risks is limited on the Owner’s Coverage Statement as follows:
• For Covered Risk 16, 18, 19 and 21, Your Deductible Amount and Our Maximum Dollar Limit of Liability shown in Schedule A.
The deductible amounts and maximum dollar limits shown on Schedule A are as follows:
Your Deductible Amount Our Maximum Dollar Limit of Liability Covered Risk 16: 1.00% of Policy Amount Shown in Schedule A or $2,500.00 (whichever is less)
$ 10,000.00
Covered Risk 18: 1.00% of Policy Amount Shown in Schedule A or $5,000.00 (whichever is less)
$ 25,000.00
Covered Risk 19: 1.00% of Policy Amount Shown in Schedule A or $5,000.00 (whichever is less)
$ 25,000.00
Covered Risk 21: 1.00% of Policy Amount Shown in Schedule A or $2,500.00 (whichever is less)
$ 5,000.00
City Council 21 – 79 5/5/2026
ATTACHMENT ONE
(CONTINUED)
Attachment One (11/04/22)
ALTA OWNER’S POLICY (07-01-2021)
EXCLUSIONS FROM COVERAGE
The following matters are excluded from the coverage of this policy, and the Company will not pay loss or damage, costs, attorneys' fees, or expenses that arise by reason of:
1. a. any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) that restricts, regulates, prohibits, or relates to:
i. the occupancy, use, or enjoyment of the Land;
ii. the character, dimensions, or location of any improvement on the Land; iii. the subdivision of land; or
iv. environmental remediation or protection.
b. any governmental forfeiture, police, regulatory, or national security power. c. the effect of a violation or enforcement of any matter excluded under Exclusion 1.a. or 1.b.
Exclusion 1 does not modify or limit the coverage provided under Covered Risk 5 or 6.
2. Any power of eminent domain. Exclusion 2 does not modify or limit the coverage provided under Covered Risk 7.
3. Any defect, lien, encumbrance, adverse claim, or other matter:
a. created, suffered, assumed, or agreed to by the Insured Claimant; b. not Known to the Company, not recorded in the Public Records at the Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; c. resulting in no loss or damage to the Insured Claimant; d. attaching or created subsequent to the Date of Policy (Exclusion 3.d. does not modify or limit the coverage provided under Covered Risk 9 or 10); or
e. resulting in loss or damage that would not have been sustained if consideration sufficient to qualify the Insured named in Schedule A as a bona fide purchaser had been given for the Title at the Date of Policy.
4. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights law, that the transaction vesting the Title as shown in Schedule A is a:
a. fraudulent conveyance or fraudulent transfer;
b. voidable transfer under the Uniform Voidable Transactions Act; or c. preferential transfer:
i. to the extent the instrument of transfer vesting the Title as shown in Schedule A is not a transfer made as a contemporaneous exchange for new value; or
ii. for any other reason not stated in Covered Risk 9.b.
5. Any claim of a PACA-PSA Trust. Exclusion 5 does not modify or limit the coverage provided under Covered Risk 8.
6. Any lien on the Title for real estate taxes or assessments, imposed or collected by a governmental authority that becomes due and payable after the Date of Policy. Exclusion 6 does not modify or limit the coverage provided under Covered Risk 2.b.
7. Any discrepancy in the quantity of the area, square footage, or acreage of the Land or of any improvement to the Land.
EXCEPTIONS FROM COVERAGE
Some historical land records contain Discriminatory Covenants that are illegal and unenforceable by law. This policy treats any Discriminatory Covenant in a document referenced in Schedule B as if each Discriminatory Covenant is redacted, repudiated, removed, and not republished or recirculated. Only the remaining provisions of the document are excepted from coverage.
This policy does not insure against loss or damage and the Company will not pay costs, attorneys' fees, or expenses resulting from the terms and conditions of any lease or easement identified in Schedule A, and the following matters:
NOTE: The 2021 ALTA Owner’s Policy may be issued to afford either Standard Coverage or Extended Coverage. In addition to variable exceptions such as taxes, easements, CC&R’s, etc., the Exceptions from Coverage in a Standard Coverage policy will also include the Western Regional Standard Coverage Exceptions listed as 1 through 7 below:
1. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records.
2. Any facts, rights, interests, or claims that are not shown by the Public Records at Date of Policy but that could be (a) ascertained by an inspection of the Land or (b) asserted by persons or parties in possession of the Land.
3. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records at Date of Policy.
4. Any encroachment, encumbrance, violation, variation, easement, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records at Date of Policy.
5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records.
6. Any lien or right to a lien for services, labor, material or equipment unless such lien is shown by the Public Records at Date of Policy.
7. Any claim to (a) ownership of or rights to minerals and similar substances, including but not limited to ores, metals, coal, lignite, oil, gas, uranium, clay, rock, sand, and gravel located in, on, or under the Land or produced from the Land, whether such ownership or rights arise by lease, grant, exception, conveyance, reservation, or otherwise; and (b) any rights, privileges, immunities, rights of way, and easements associated therewith or appurtenant thereto, whether or not the interests or rights excepted in (a) or (b) appear in the Public Records or are shown in Schedule B.
City Council 21 – 80 5/5/2026
ATTACHMENT ONE
(CONTINUED)
Attachment One (11/04/22)
2006 ALTA OWNER’S POLICY (06-17-06)
EXCLUSIONS FROM COVERAGE
The following matters are expressly excluded from the coverage of this policy, and the Company will not pay loss or damage, costs, attorneys' fees, or expenses that arise by reason of:
1. (a) Any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) restricting, regulating, prohibiting, or relating to
(i) the occupancy, use, or enjoyment of the Land;
(ii) the character, dimensions, or location of any improvement erected on the Land; (iii) the subdivision of land; or
(iv) environmental protection;
or the effect of any violation of these laws, ordinances, or governmental regulations. This Exclusion 1(a) does not modify or limit the coverage provided under Covered Risk 5.
(b) Any governmental police power. This Exclusion 1(b) does not modify or limit the coverage provided under Covered Risk 6.
2. Rights of eminent domain. This Exclusion does not modify or limit the coverage provided under Covered Risk 7 or 8.
3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed, or agreed to by the Insured Claimant; (b) not Known to the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resulting in no loss or damage to the Insured Claimant; (d) attaching or created subsequent to Date of Policy (however, this does not modify or limit the coverage provided under Covered Risk 9 and 10); or
(e) resulting in loss or damage that would not have been sustained if the Insured Claimant had paid value for the Title.
4. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors’ rights laws, that the transaction vesting the Title as shown in Schedule A, is
(a) a fraudulent conveyance or fraudulent transfer; or
(b) a preferential transfer for any reason not stated in Covered Risk 9 of this policy.
5. Any lien on the Title for real estate taxes or assessments imposed by governmental authority and created or attaching between Date of Policy and the date of recording of the deed or other instrument of transfer in the Public Records that vests Title as shown in Schedule A.
EXCEPTIONS FROM COVERAGE
This policy does not insure against loss or damage, and the Company will not pay costs, attorneys’ fees, or expenses that arise by reason of:
NOTE: The 2006 ALTA Owner’s Policy may be issued to afford either Standard Coverage or Extended Coverage. In addition to variable exceptions such as taxes, easements, CC&R’s, etc., the Exceptions from Coverage in a Standard Coverage policy will also include the Western Regional Standard Coverage Exceptions listed below as 1 through 7 below:
1. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records.
2. Any facts, rights, interests, or claims that are not shown by the Public Records at Date of Policy but that could be (a) ascertained by an inspection of the Land, or (b) asserted by persons or parties in possession of the Land.
3. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records at Date of Policy.
4. Any encroachment, encumbrance, violation, variation, easement, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records at Date of Policy.
5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records.
6. Any lien or right to a lien for services, labor, material or equipment unless such lien is shown by the Public Records at Date of Policy.]
7. Any claim to (a) ownership of or rights to minerals and similar substances, including but not limited to ores, metals, coal, lignite, oil, gas, uranium, clay, rock, sand, and gravel located in, on, or under the Land or produced from the Land, whether such ownership or rights arise by lease, grant, exception, conveyance, reservation, or otherwise; and (b) any rights, privileges, immunities, rights of way, and easements associated therewith or appurtenant thereto, whether or not the interests or rights excepted in (a) or (b) appear in the Public Records or are shown in Schedule B.
City Council 21 – 81 5/5/2026
Notice of Available Discounts
Notice of Available Discounts Printed: 04.06.26 @ 05:07 PM SCA0003004.doc / Updated: 02.16.26 Page 19 of 20 CA-CT-FBSC-02180.054674-FBSC2600762 Pursuant to Section 2355.3 in Title 10 of the California Code of Regulations Fidelity National Financial, Inc. and its subsidiaries ("FNF") must deliver a notice of each discount available under our current rate filing along with the delivery of escrow instructions, a preliminary report or commitment. Please be aware that the provision of this notice does not constitute a waiver of the consumer's right to be charged the filed rate. As such, your transaction may not qualify for the below discounts.
You are encouraged to discuss the applicability of one or more of the below discounts with a Company representative.
These discounts are generally described below; consult the rate manual for a full description of the terms, conditions and requirements for such discount. These discounts only apply to transactions involving services rendered by the FNF Family of Companies. This notice only applies to transactions involving property improved with a one-to-four family residential dwelling.
Not all discounts are offered by every FNF Company. The discount will only be applicable to the FNF Company as indicated by the named discount.
FNF Underwritten Title Companies Underwritten by FNF Underwriters CTC - Chicago Title Company CTIC - Chicago Title Insurance Company CLTC - Commonwealth Land Title Company CLTIC - Commonwealth Land Title Insurance Co.
FNTC - Fidelity National Title Company FNTIC - Fidelity National Title Insurance Co.
FNTCCA - Fidelity National Title Company of California NTINY - National Title Insurance of New York TICOR - Ticor Title Company of California
LTC - Lawyer's Title Company
SLTC - ServiceLink Title Company
Available Discounts
CHURCHES OR CHARITABLE NON-PROFIT ORGANIZATIONS (CTIC, CLTIC, FNTIC, NTINY) On properties used as a church or for charitable purposes within the scope of the normal activities of such entities, provided said charge is normally the church's obligation the charge for an owner's policy shall be fifty percent (50%) to seventy percent (70%) of the appropriate title insurance rate, depending on the type of coverage selected. The charge for a lender's policy shall be forty percent (40%) to fifty percent (50%) of the appropriate title insurance rate, depending on the type of coverage selected.
DISASTER AREA TRANSACTIONS (CTIC, CLTIC, FNTIC, NTINY)
This rate is available for individuals or entities that were victims of a national or state disaster. The rate can be used for a Lender's Policy (Standard or Extended), or an Owner's Policy (Standard or Homeowners coverage). To qualify for this rate, the applicant must, prior to the closing of the applicable transaction, make a written request, including a statement meeting the following criteria:
A. The subject property is in a disaster area declared by the government of the United States or the State of California.
B. The subject property was substantially or totally destroyed in the declared disaster.
C. The subject property ownership has not changed since the time of the disaster.
The rate will be fifty percent (50%) of the applicable rate, and the transaction must be completed within sixty (60) months of the date of the declaration of the disaster.
DISASTER AREA ESCROWS (CTC, CLTC, FNTC, TICOR, LTC)
This rate is available for individuals or entities that were victims of a national or state disaster. The rate can be used for a loan or a sale escrow transaction. To qualify for this rate, the applicant must, prior to the closing of the applicable transaction, make a written request, including a statement meeting the following criteria:
A. The subject property is in a disaster area declared by the government of the United States or the State of California.
B. The subject property was substantially or totally destroyed in the declared disaster.
C. The subject property ownership has not changed since the time of the disaster.
City Council 21 – 82 5/5/2026
Notice of Available Discounts
(continued)
Notice of Available Discounts Printed: 04.06.26 @ 05:07 PM SCA0003004.doc / Updated: 02.16.26 Page 20 of 20 CA-CT-FBSC-02180.054674-FBSC2600762 The rate will be fifty percent (50%) of the applicable rate, and the transaction must be completed within sixty (60) months of the date of the declaration of the disaster. Standard minimum charge applies based upon property type. No other discounts or special rates, or combination of discounts or special rates, shall be applicable. Applies to a single transaction per property.
This rate is applicable to the following Zones/Counties:
Zone 1.A: Orange County
Zone 1.B: Riverside and San Bernardino Counties
Zone 2: Los Angeles County
Zone 3: Ventura County
Zone 10: San Diego County
Zone 12: Imperial County
If used for a sale transaction, the application of this rate assumes the charge for the Residential Sale Escrow Services (RSES) fee will be split evenly between buyer and seller. As such and regardless of how the calculated applicable RSES will be split between the disaster victim and the other principal, the rate will be applied only to one half (1/2) of the calculated applicable RSES fee, regardless of whether the disaster victim is paying half (1/2) of the RSES fee (as is customary) or paying the entire fee. The rate under this provision will be fifty percent (50%) of disaster victims' one half (1/2) portion only and shall not apply to any portion paid by non-disaster victim. Additional services will be charged at the normal rates.
MILITARY DISCOUNT RATE (CTIC, CLTIC, FNTIC)
Upon the Company being advised in writing and prior to the closing of the transaction that an active duty, honorably separated, or retired member of the United States Military or Military Reserves or National Guard is acquiring or selling an owner occupied one-to-four family property, the selling owner or acquiring buyer, as applicable, will be entitled to a discount equal to fifteen percent (15%) of the otherwise applicable rates such party would be charged for title insurance policies. Minimum charge: Four Hundred Twenty-Five And No/100 Dollars ($425.00) The Company may require proof of eligibility from the parties to the transaction verifying they are entitled to the discount as described. No other discounts or special rates, or combination of discounts or special rates, shall be applicable.
City Council 21 – 83 5/5/2026
EXHIBIT E
Project Name: Santa Ana Property Exchange
EXHIBIT E
Deed
City Council 21 – 84 5/5/2026
Project Name: Santa Ana Property Exchange
RECORDING REQUESTED BY
AND WHEN RECORDED RETURN TO:
City of Santa Ana
20 Civic Center Plaza
Santa Ana, California
Attn: City Manager
And
County of Orange
CEO Real Estate
400 W. Civic Center Drive, 5th Floor
Santa Ana, California
Attn: Chief Real Estate Officer
No Recording Fee Pursuant to Gov’t Code § 27383
No Documentary Transfer Tax Pursuant to
Revenue & Taxation Code § 11922
______________________________________________________________________________ (Space Above for Recorder’s Use)
QUITCLAIM DEED
The undersigned grantor declares:
Documentary transfer tax is shown on the
accompanying statement and is not for public record.
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, the County of Orange, a political subdivision of the State of California (“Grantor”), hereby quitclaims to the City of Santa Ana, a municipal corporation organized and existing under the laws of the State of California (“Grantee”), all right title and interest in the real property located in the City of Santa Ana, County of Orange, State of California, described in Schedule 1 attached hereto and incorporated herein by reference (the “Property”).
SUBJECT TO:
1. General and Special Real Property Taxes for the current fiscal year.
2. Covenants, conditions, restrictions, easements, reservations, rights and rights-ofway of record, including, without limitation, all water, water rights and water stock relating to the Property and any other easements, rights-of-way or appurtenances used in connection with the beneficial use and enjoyment of the Property or other real property held by the County.
3. County’s Right to Reversion. Except in the event of a “Permitted Delay”, the Grantor and Grantee acknowledge and agree that the Grantor’s quitclaim of the City Council 21 – 85 5/5/2026
Project Name: Santa Ana Property Exchange
Property to the Grantee is for the purpose of Grantee’s use of the Property in conjunction with Grantee’s Capital Improvement Program for Modification to the Law Library Deck (Plaza of the Fountains) and Access as set forth in that unrecorded Transfer Agreement between Grantor and Grantee dated ________ .
The Grantor and Grantee agree that Grantee shall commence the construction of the Project no later than five (5) years from the date of execution of this deed, and should the Grantee fail to do so, then the Property shall revert to the County, and it shall be lawful for Grantor to re-enter, to have, and to enjoy the Property as of its former estate. Title to the Property thereupon shall vest in Grantor and all right, title, and interest therein of Grantee shall terminate; but Grantee shall quitclaim all interest in the Property set forth in this deed, record such quitclaim deed related thereto, and provide a copy of the recorded quitclaim deed to the County no later than 60 days after such reversion. As used herein, the term "Permitted Delay" shall refer to any delay resulting from acts of God; fire; earthquake; flood; explosion; action of the elements; war; invasion; insurrection; riot; mob violence; sabotage; malicious mischief; inability (notwithstanding good faith and diligent efforts) to procure (or general shortage of) labor, equipment, facilities, materials, or supplies in the open market; failure of transportation; strikes (other than any strike resulting from acts of Grantee); lockouts; action of labor unions; condemnation laws; requisition or order of government or civil or military or naval authorities; or any other similar cause to those stated above, not within Grantee’s reasonable control. Notwithstanding anything to the contrary contained herein, in no event shall financial inability constitute Permitted Delay
4. Grantor shall also reserve and retain for itself an access easement(s) running north and south along the length of the Law Library and include a pathway of travel to connect adjacent County properties. The access easement will be legally described and granted after the City has completed their construction design and County reviews and approves said design and legal description. The parties agree to subsequently amend this deed to record the final legal description after the City’s completion of construction and County’s approval of the design and description.
City Council 21 – 86 5/5/2026
Project Name: Santa Ana Property Exchange
COUNTY OF ORANGE:
By:________________________________
Thomas A. Miller
Chief Real Estate Officer
Pursuant to Minute Order Dated ______________
Date:______________________________
APPROVED AS TO FORM:
By:_____________________________
County Counsel
Date: ___________________________
City Council 21 – 87 5/5/2026
Project Name: Santa Ana Property Exchange
STATE OF CALIFORNIA )
COUNTY OF __________________)
On ________________________, before me, ________________________________, personally appeared _______________________________, (or ___________________, who proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature_________________________________
City Council 21 – 88 5/5/2026
Project Name: Santa Ana Property Exchange
CERTIFICATE OF ACCEPTANCE
This is to certify that the interest in real property conveyed by the within deed or grant to the CITY OF SANTA ANA, a California municipal corporation, is hereby accepted by order of the City Council of Santa Ana, California, and the CITY OF SANTA ANA consents to recordation thereof.
ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL ALVARO NUÑEZ
City Clerk City Manager
City Council 21 – 89 5/5/2026
Project Name: Santa Ana Property Exchange
Schedule 1
to
Quitclaim Deed
Legal Description of Property
All that certain real property located in the City of Santa Ana, County of Orange, State of California, described as follows:
(Attached hereto and made part hereof)
City Council 21 – 90 5/5/2026
901 Via Piemonte, Suite 400,Ontario, CA 91764
909.477.6915 Fax: 909.477.6916 imegcorp.com
EXHIBIT "A"
EXHIBIT "A"
FACILITY NAME: SANTA ANA CIVIC CENTER
FACILITY NO.: GA401
PARCEL NO.: 289
City Council 21 – 91 5/5/2026
901 Via Piemonte, Suite 400,Ontario, CA 91764
909.477.6915 Fax: 909.477.6916 imegcorp.com
EXHIBIT "B"
EXHIBIT "B"
LEGEND:
City Council 21 – 92 5/5/2026
Public Works Agency
www.santa-ana.org/pw
Item # 22
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
May 5, 2026
TOPIC: Approve Appropriations Adjustments and a CIP Amendment, and Agreements with Mark Thomas, Southern California Regional Rail Authority (SCRRA), the U.S.
Department of Transportation, and Caltrans for Design Phase Services and Grant Funding for the Santa Ana Boulevard Grade Separation Project (No. 26-6718) (NonGeneral Fund).
AGENDA TITLE
Approve Appropriations Adjustments and a CIP Amendment, and Agreements with Mark Thomas, Southern California Regional Rail Authority (SCRRA), the U.S.
Department of Transportation, and Caltrans for Design Phase Services and Grant Funding for the Santa Ana Boulevard Grade Separation Project (No. 26-6718) (NonGeneral Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment recognizing Transit and Intercity Rail Capital Program (TIRCP) grant funding in the amount of $7,000,000 into the Select Street Construction, State Grant-Direct revenue account (05917660- 52025) and appropriate the same amount into the Select Street Construction, Improvements Other Than Building expenditure account (05917660-66220) (Requires five affirmative votes).
2. Approve an appropriation adjustment recognizing $134,176 in prior-year fund balance in the Transit Zoning Code, Prior Year Carry Forward revenue account and appropriate the same amount into the Transit Zoning Code, Improvements Other Than Buildings expenditure account (Requires five affirmative votes).
3. Approve an appropriation adjustment recognizing $90,742 in prior-year fund balance in the Local Drainage Area Fees – IV, Prior Year Carry Forward revenue account and appropriate the same amount into the Local Drainage Area Fees – IV, Improvements Other Than Buildings expenditure account (Requires five affirmative votes).
City Council 22 – 1 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
4. Approve an amendment to the Fiscal Year 2025-2026 Capital Improvement Program to include TIRCP grant funding in the amount of $7,000,000, Local Drainage Area Fees – IV in the amount of $90,742 and Transit Zoning Code funding in the amount of $134,176 for the inclusion of Santa Ana Boulevard Grade Separation Project. (Project No. 26-6718)
5. Authorize the City Manager to execute an agreement with Mark Thomas & Company, Inc. to provide Professional Design Phase Services in an amount notto-exceed $6,859,918, which includes $6,471,318 in Design costs and $388,600 for unanticipated or unforeseen work, for a three-year term beginning May 5, 2026 and expiring May 4, 2029, with provisions for two, one-year extensions (Agreement No. A-2026-XXX).
6. Authorize the City Manager to execute an agreement with Southern California Regional Rail Authority (SCRRA) to provide Design Support in an amount not-toexceed $315,000 for a three-year term beginning May 5, 2026 and expiring May 4, 2029, with provisions for two, one-year extensions (Agreement No. A-2026- XXX).
7. Authorize the City Manager to execute an agreement with U.S Department of Transportation (USDOT) and the California Department of Transportation (Caltrans) to receive RAISE Grant funds for the Santa Ana Boulevard Grade Separation project (Agreement No. A-2026-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
EXECUTIVE SUMMARY
On January 4, 2011, the City Council approved an agreement with AECOM Engineering Services to prepare a Project Study Report Equivalent (PSRE) and develop conceptual engineering plans for the Santa Ana Boulevard Grade Separation (SAGS) Project. At the time, staff secured $1,500,000 in funding from the Orange County Transportation Authority (OCTA) to complete the PSRE and conceptual engineering phase. Caltrans requires a PSRE for all transportation projects within local agency jurisdiction that would like to receive state or federal and be included in the State Transportation Improvement Program (STIP) and/or Federal Transportation Improvement Program (FTIP).
The proposed SAGS project (Exhibit 1) is adjacent to the Santa Ana Regional Transportation Center (SARTC) and will include a new four-lane underpass to replace the existing at-grade rail crossing at the Southern California Regional Rail Authority (SCRRA) double tracks on Santa Ana Boulevard. By eliminating the at-grade crossing, the project will allow for enhanced safety by separating vehicles, pedestrians, and cyclists from trains at the railroad crossing. It will reduce traffic congestion along a busy arterial, encourage a passenger rail mode shift, reduce air and noise pollution, provide City Council 22 – 2 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
unhindered access for emergency vehicles, and provide connectivity across Santa Ana Boulevard to SARTC. The improvements will include a raised median, bike lanes, sidewalks, pedestrian and rail bridges, storm water pump station, space for a transportation opportunity zone, and a pedestrian plaza. The total cost of this project is estimated to be $126,500,000 and can only be realized with grant funding, which is typical for transportation projects of this magnitude.
In 2014, the City Council approved the PSRE and environmental report for the proposed SAGS project. This action transformed SAGS from a concept to a formally identified capital improvement project for the City and allowed staff to pursue grant funding for the project.
On July 6, 2023, California State Transportation Agency (CalSTA) awarded a $7,000,000 grant from the TIRCP program to the City to fund the design phase of the project. Due to the highly complex nature of grade separation projects, staff is unable to perform the design phase scope in-house and requires the services of a highly experienced engineering firm that has demonstrated experience on grade separation projects. Staff performed an extensive, competitive Request for Proposals procurement process and recommends awarding a design phase services contract to Mark Thomas in an amount not to exceed $6,859,918. Their proposal and subsequent interview received the highest score due to their experienced team and proven track record on other grade separations in southern California. In addition, Mark Thomas submitted a highly competitive fee substantially below the industry standard of 10% of the construction cost estimate ($12,650,000 in this case), allowing the entirety of the design phase services to be paid for by the CalSTA grant.
To date, the City has received a total of $32,000,000 to fund the project including the following grants:
• $7,000,000 grant from the State Transit and Intercity Rail Capital Program (TIRCP)
• $25,000,000 grant from the Federal Rebuilding American Infrastructure with Sustainability and Equity (RAISE) program
Staff only seeks approval of design phase services and will continue to seek additional grants from both State and Federal programs to fully fund the SAGS project. Right-ofWay and construction phases of the project will not commence until the project is fully funded, likely no sooner than 2028.
TIRCP Grant
On July 6, 2023, California State Transportation Agency (CalSTA) awarded a $7,000,000 grant from the TIRCP program to the City to fund the engineering phase and the revalidation of the project’s environmental documentation. The original environmental report was approved by the City Council on December 2, 2014; however, City Council 22 – 3 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
due to its age and subsequent changes in the project area – including new developments, implementation of the OC Streetcar, and coordination with the County of Orange –the environmental analysis is required to be updated to reflect current conditions.
The TIRCP program requires a Master Agreement (MA) to allow agencies to receive funds from the program as well as a Program Supplement Agreement (PSA) defining the specifics of each individual project. On December 17, 2024, the City Council authorized execution of Master Agreement No. 64SantaAnaMA with the California Department of Transportation (Caltrans). The executed MA was received from Caltrans on December 18, 2025, authorizing the City to procure a contract for the described services. Additionally, on October 17, 2025, the project was approved by the California Transportation Commission (CTC), authorizing Caltrans to draft the PSA. Staff is currently working with Caltrans to finalize the PSA. The CTC action authorizes grantees to award contracts and begin expending funds until the PSA is executed.
RAISE Grant
On June 26, 2024, the United States Department of Transportation (USDOT) awarded the City $25,000,000 through the RAISE program to fund a portion of the project’s rightof-way (ROW) acquisition and construction phases. As a condition of the award, Caltrans will serve as the primary recipient of the grant and enter into a grant agreement with USDOT, while the City will execute a separate subrecipient agreement with Caltrans. The attached agreement (Exhibit 4) is the grant agreement between USDOT and Caltrans, to which the City is also a signatory as the subrecipient. Following execution of the recipient agreement and negotiation with Caltrans, the subrecipient agreement will be brought before City Council for approval.
Southern California Regional Rail Authority (SCRRA) Agreement Because the project entails major modifications to the railroad crossing and corridor, a Design Services Agreement with SCRRA is required. The agreement will provide comprehensive design support throughout the project, including participation in field reviews, detailed site inspections, and ongoing coordination during both the design and construction phases. SCRRA will review proposed improvements to ensure consistency with railroad operational requirements, safety standards, and applicable regulatory guidelines. This support will include evaluation of existing conditions, verification of design assumptions, coordination with Orange County Transportation Authority (OCTA), California Public Utilities Commission (CPUC), Metrolink, and review of plans, specifications, and construction activities to confirm compatibility with current and future rail operations. SCRRA will also provide technical input and recommendations to help minimize service disruptions, maintain safe rail operations, and ensure the project is delivered in accordance with established railroad criteria and best practices.
Staff recommends adding the TIRCP and RAISE grant, Drainage Area Fee, and Transit Zoning Code transportation system improvement funds to the Santa Ana Boulevard City Council 22 – 4 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
Grade Separation Project for the Design, Right-of-Way, and Construction Phases and amending the Fiscal Year 2025-26 Capital Improvement Program to include these funds. Additionally, staff recommends approval of the agreement with SCRRA for their support of the project.
Engineering Phase Consultant Procurement
To facilitate this highly complex project, consultant support is required to provide the requisite technical expertise as well as to advise and support the complicated regulatory and grant compliance requirements of the project. To provide these services, Request for Proposals (RFP) No. 25-131A was advertised on November 14, 2025 on the City’s online bid management and publication system, PlanetBids. A summary of vendor participation and results is as follows:
2,411 Vendors notified
117 Santa Ana vendors notified
117 Vendors downloaded the bid packet
5 Bids received
0 Bids received from Santa Ana vendors
Proposals were solicited, opened on January 14, 2026, and evaluated. Five proposals were submitted by the RFP deadline and all proposals were determined to be responsive to the specifications and met the City’s requirements. Proposals were subsequently evaluated by a selection committee comprised of City staff and OCTA staff. Based on criteria outlined in the RFP, the following summarizes the top responding firms:
Firm City Ranking
Mark Thomas Irvine, CA 1
RailPros, Inc. Irvine, CA 2
Kimley Horn Orange, CA 3
Moffatt & Nichol Costa Mesa, CA 4
T.Y. Lin International Irvine, CA 5
Staff recommends awarding an agreement to the highest-ranked firm, Mark Thomas.
Mark Thomas has had previous contracts with the City for the Grant Writing for this project and as the engineering consultant for the Standard Avenue Protected Bike Lane Project as well as serving as an on-call engineering consultant for the City. Their proposal and subsequent interview received the highest score due to their consistent team dynamic on many other grade separations as well as their innovative connectivity of pedestrians and bikes through the grade separation and connections to the north.
The RFP included Design, ROW, and Construction Support services. The fee for each of these services was negotiated, but the agreement proposes only to award Design Engineering services at this time. Future amendments for the ROW Engineering and City Council 22 – 5 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
Construction Support services will be recommended for City Council approval as future grant funding for the project materializes.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with the recommended action. As part of this proposed agreement, the Consultant will be preparing a revalidated environmental report for future consideration by City Council.
FISCAL IMPACT
With the approval of the requested appropriation adjustments, the funds will be budgeted and available per the accounts listed in the table below. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2026-2027.
Approval of the requested appropriation adjustments will recognize $7,000,000 in the Select Street Construction, State Grant-Direct revenue account (No. 05917002-52025) and appropriate for spending in the Select Street Construction, Improvements Other Than Building expenditure account (No. 05917660-66220).
A portion of the Transit Zoning Code Transportation System Improvements accumulated fund balance will be appropriated for spending in the Transit Zoning Code, Improvements Other Than Building expenditure account (No. 04817660-66220). The spendable portion of the fund balance is estimated to be $134,176 as of June 30, 2026, which is sufficient to allow for the recommended appropriation of $134,176.
A portion of the Drainage Area Fee IV accumulated fund balance will be appropriated for spending in the Public Works Storm Drain, Improvements Other Than Building expenditure account (No. 22417660-66220). The spendable portion of the fund balance is estimated to be $218,222 as of June 30, 2026, which is sufficient to allow for the recommended appropriation of $90,742.
Fiscal
Year
Accounting
Unit – Account
No.
(Project No.)
Fund
Description
Accounting Unit,
Account
Description
Amount
APPROPRIATION ADJUSTMENT
2025-26
04817660-
66220
(26-6718)
Transit Zoning
Code
Transit Zoning
Code,
Improvements Other
Than Buildings
$134,176
2025-26
05917660-
66220
(26-6718)
Select Street
Construction
Select Street
Construction,
Improvements Other
Than Buildings
$7,000,000
City Council 22 – 6 5/5/2026
Santa Ana Boulevard Grade Separation Project
May 5, 2026
2025-26
22417660-
66220
(26-6718)
Drainage
Area Fee IV
Public Works Storm
Drain,
Improvements Other
Than Buildings
$90,742
TOTAL $7,224,918
EXHIBIT(S)
1. Location Map
2. RFP No. 25-131A
3. Agreement with Mark Thomas
4. Subrecipient Agreement with Caltrans
5. SCRRA Agreement
6. CIP Amendment
Submitted By: Rodolfo Rosas, P.E, Acting Executive Director, Public Works Agency Approved By: Alvaro Nuñez, City Manager
City Council 22 – 7 5/5/2026
PWA
SANTA ANA
PUBLIC WORKS AGENCY
GRADE SEPARATION PROJECT
SANTA ANA BLVD.
EXHIBIT 1
SANTAANA
CIVICCENTER
WASHINGTON
CUSTER
FRUIT FRUIT FULLER
FULLER
LOGAN LOGAN
FRUIT
STAFFORD
POINSETTIA
ALLEY ALLEY
ALLEY
SANTIAGO
TER
M
INAL
SANTIAGO
LINCOLN
LOGAN
POINSETTIA
SANTIAGO
SANTAANA
WASHINGTON
TRAINSTATION
SANTAANA
Project Location
Legend
EXHIBIT 1
City Council 22 – 8 5/5/2026
EXHIBIT 2
City Council 22 – 9 5/5/2026
CITY OF SANTA ANA
TABLE OF CONTENTS
I. CITY BACKGROUND ..................................................................................................................... 4 II. OVERVIEW OF PROJECT ............................................................................................................ 4 III. MANDATORY/OPTIONAL PRE-PROPOSAL MEETING ............................................................... 4 IV. TERM OF AGREEMENT ................................................................................................................ 4 V. MINIMUM QUALIFICATIONS ........................................................................................................ 4 VI. RESPONSE TO RFP ..................................................................................................................... 5 VII. CERTIFICATIONS (ATTACHMENTS) ........................................................................................... 9 VIII. REFERENCES ............................................................................................................................. 10 IX. MINIMUM SCOPE AND LIMIT OF INSURANCE ......................................................................... 10 X. SELECTION PROCEDURES & CRITERIA .................................................................................. 10 XI. WITHDRAWALS ........................................................................................................................... 12 XII. GENERAL TERMS AND CONDITIONS ....................................................................................... 12 XIII. ADDITIONAL TERMS AND CONDITIONS FOR PUBLIC WORKS PROJECTS ......................... 17 XIV FEDERAL FUNDING REQUIREMENTS ...................................................................................... 19 XV. AWARD OF AGREEMENT .......................................................................................................... 20 XVI. IMPLEMENTATION ...................................................................................................................... 20
EXHIBITS
Exhibits provided herein for Proposers’ reference only.
EXHIBIT I – SCOPE OF SERVICES
EXHIBIT II – SAMPLE AGREEMENT
EXHIBIT III – FEDERAL REGULATIONS
EXHIBIT IV – COMMUNITY WORKFORCE AGREEMENT (CWA)
ATTACHMENTS
A PROPOSER’S CERTIFICATION, PROPOSAL ITEM PRICING
B PROPOSER’S STATEMENT
C NON-COLLUSION AFFIDAVIT
D NON-LOBBYING CERTIFICATION
E NON-DISCRIMINATION CERTIFICATION
F CARB FLEET COMPLIANCE CERTIFICATION
G STATEMENT REGARDING CWA REQUIREMENTS
H SAM.GOV UEI VERIFICATION
I CERTIFICATE REGARDING DEBARMENT, SUSPENSION, INEGIBILITY AND VOLUNTARY
EXCLUSION
J CALTRANS REQUIREMENTS
K NOTICE OF ESTABLISHMENT OF NEW QUIET ZONE - 2014
L PROJECT REPORT EQUIVALENT – 2014
EXHIBIT 2
City Council 22 – 10 5/5/2026
CITY OF SANTA ANA
M CEQA DETERMINATION – 2025
N NEPA CLEARANCE & TECHNICAL STUDIES – 2014
N1 NEPA CLEARANCE
N2 TRAFFIC/CIRCULATION STUDY
N3 NOISE STUDY REPORT
N4 AIR QUALITY ASSESSMENT REPORT
N5 INITIAL SITE ASSESSMENT REPORT
N6 PHASE I ENVIRONMENTAL SITE ASSESSMENT – NORTH AREA
N7 PHASE I ENVIRONMENTAL SITE ASSESSMENT- SOUTH AREA
N8 PHASE I ENVIRONMENTAL SITE ASSESSMENT- FRUIT STREET SHOPS N9 PHASE II ENVIRONMENTAL SITE ASSESSMENT- FRUIT STREET SHOPS N10 WATER QUALITY TECHNICAL MEMORANDUM
N11 NATURAL ENVIRONMENT STUDY
N12 VISUAL IMPACT ASSESSMENT
N13 RELOCATION IMPACT MEMORANDUM
N14 COMMUNITY IMPACT ASSESSMENT
N15 HISTORIC PROPERTY SURVEY REPORT
O PROJECT EXHIBIT
EXHIBIT 2
City Council 22 – 11 5/5/2026
CITY OF SANTA ANA
I. CITY BACKGROUND
The City of Santa Ana, California, is rich in culture and pride, the county seat of Orange County, and encompasses an area of approximately 27 square miles. For more information, please visit https://www.santa-ana.org/
II. OVERVIEW OF PROJECT
The City of Santa Ana (City) is seeking proposals from qualified firms and organizations (Proposers) to provide Environmental Revalidation, PS&E, and Right-of-Way Services. See EXHIBIT I for complete Scope of Services.
The term “Vendor”, “Proposer”, “Consultant”, “Firm”, and “Contractor” shall refer to any legal entity or entities submitting a proposal in response to this Request for Proposals (RFP).
Project may be funded with State and Federal grant funds administered by the California Department of Transportation (Caltrans). Special conditions shall apply. Refer to Scope of Work for further information.
State and Federal grant funds administered by the California Department of Transportation (Caltrans) will be used to fund all or a portion of this project. The successful proposer will be required to comply with all requirements associated with federal funding in carrying out the project. The Federal Funding Requirements and Attachment L of this RFP provides additional information on federal funding requirements.
III. MANDATORY/OPTIONAL PRE-PROPOSAL MEETING
Not Required
IV. TERM OF AGREEMENT
The anticipated term of the agreement is for an initial period of three (3) years. The City may, at its discretion, extend the agreement with the same or more limited scope of required services for two (2) additional one (1) year periods, upon mutual agreement contingent upon City Council approval, or City Manager or City Attorney authorization, as appropriate. The total term of the awarded agreement shall not exceed five (5) years.
Usage is not guaranteed. Execution of an agreement between the City and successful firm(s) and/or individual(s) does not guarantee work throughout the duration of the contract period.
Numerous factors will be evaluated by the City in its delivery of project and assignments, including technical expertise required.
V. MINIMUM QUALIFICATIONS
Add any minimum requirements as appropriate for project. Proposers not meeting the minimum requirements may be deemed non-responsive.
1) Consultant must have been in business continuously for the most recent five (5) years prior to the date of this RFP.
EXHIBIT 2
City Council 22 – 12 5/5/2026
CITY OF SANTA ANA
2) Minimum three (3) most recent years of experience performing similar services as those detailed in the Scope of Services section of this RFP.
VI. RESPONSE TO RFP
A. SUBMITTAL INSTRUCTIONS
It is the responsibility of the Proposer to ensure that any proposals submitted have been uploaded to PlanetBids prior to the RFP due date and time. Proposals, including all required sections and forms, shall be submitted electronically via the City’s Bid Management System, PlanetBids. Additionally, it is a requirement that five (5) hard copy proposals be delivered to the Public Works Agency drop box located on the first floor of Ross Annex across from the Development Permit counter in an enclosed sealed envelope and marked clearly with the following:
Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. For further instructions regarding hard copy submission of proposals, refer to PlanetBids.
PlanetBids will not accept late proposals and no exceptions shall be made. Proposers will receive an e-bid confirmation number with a time stamp from PlanetBids indicating that their proposal was submitted successfully. The City will only receive and consider those proposals that were transmitted successfully. Submit proposal online at:
http://www.planetbids.com/portal/portal.cfm?CompanyID=20137.
Proposer shall be solely responsible for informing itself with respect to the proper utilization of the bid management system, for ensuring the capability of their computer system to upload the required documents, and for the stability of their internet service. Failure of the Proposer to successfully submit an electronic proposal shall be at the Proposer’s sole risk and no relief will be given for late and/or improperly submitted proposals. Proposers experiencing any technical difficulties with the bid submission process may contact PlanetBids at (818) 992- 1771. Questions of an operational nature may be directed to the City’s assigned Buyer.
Neither the City, nor PlanetBids, makes any guarantee as to the timely availability of assistance, or assurance that any given problem will be resolved by the bid submission deadline.
Proposals shall NOT be sent via telegraphic, electronic, or facsimile means.
All notifications, updates and addenda will be posted online on PlanetBids at https://www.planetbids.com/portal/portal.cfm?CompanyID=20137. Proposers shall be “SEALED PROPOSAL FOR
SANTA ANA GRADE SEPARATION PROJECT
RFP NO. 25-131A
IN THE CITY OF SANTA ANA
DO NOT OPEN WITH REGULAR MAIL.”
City of Santa Ana
Attn.: Jason Gabriel, PE
Public Works Agency; M-36
20 Civic Center Plaza; Ross Annex
Santa Ana, CA 92701
EXHIBIT 2
City Council 22 – 13 5/5/2026
CITY OF SANTA ANA
responsible for monitoring the site to obtain information regarding this solicitation. Failure to respond to required updates may result in a determination of a nonresponsive proposal.
B. COMMUNICATION / CONTACT WITH CITY STAFF
Unless otherwise authorized herein, Proposers who are considering submitting a proposal in response to this RFP, or who submit a proposal in response to this RFP, are only to communicate with the assigned Project Coordinator(s), and no other City staff about this RFP from the date this RFP is issued until ais awarded. The City will provide all official communication concerning this RFP in writing via the City’s Bid Management System, PlanetBids.
The City will not be responsible for or bound by any oral communication or any other information or contact that occurs outside the official communication process specified herein, unless confirmed in writing by the designated Project Manager(s).
C. REQUEST FOR INFORMATION OR CLARIFICATION / QUESTIONS Questions regarding this RFP shall be submitted via PlanetBids. Responses to all questions will be posted on PlanetBids no later than the date and time shown at the schedule of key RFP dates on the cover page of this RFP. All prospective Proposers are advised to visit PlanetBids on a regular basis as responses may be posted earlier than the date above (if applicable). No verbal requests or responses will be accepted. Significant interpretations or clarifications will be addressed via addenda to this RFP.
Significant interpretations or clarifications and responses to questions received by the deadline will be addressed via addenda to this RFP, which will be released and posted on PlanetBids under the “Addenda/Emails” tab.
D. EXCEPTIONS
Requests submitted for City’s consideration of proposed terms and conditions, including modifications to the City’s RFP and/or Agreement terms and conditions must be submitted by the deadline for questions. Such requests should include an attachment in Word or PDF format on formal company letterhead that shows the requested modifications. Should the Proposer be considered for award recommendation and progress into the negotiations phase, the requests for exceptions or modifications to the City’s terms and conditions will be discussed at that time. The City will not accept any requests after the deadline for questions and reserves the right to reject or strike any requests for exceptions or additional terms and conditions related to Agreement, RFP, and insurance and indemnification terms and conditions.
E. ADDENDA
Any changes in RFP from the date of release to date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted on City’s PlanetBids system, https://www.planetbids.com/portal/portal.cfm?CompanyID=20137.
Proposers shall be responsible for monitoring the site to obtain information regarding this solicitation.
F. UNDERSTANDING PROPOSAL
It is the responsibility of each Proposer to inquire about any criteria, condition, term, provision, or requirement of the RFP that the Proposer does not understand. Responses to inquiries, if they significantly change or clarify the RFP requirements or any aspect of the procurement process, will be forwarded by addenda to all Proposers. The City will not be bound by any oral responses to inquiries. By submitting proposals, Proposers assert that they have fully EXHIBIT 2
City Council 22 – 14 5/5/2026
CITY OF SANTA ANA
read the RFP and any addenda issued by the City, the proposed Agreement and any other Agreement Documents, and affirm that the terms and conditions stated therein are fully understood and are acceptable to the Proposer. Each Proposer accepts the terms and conditions of the Agreement Documents and indicates their ability and willingness to perform the requested services under such terms and conditions. Any exceptions to the terms and conditions set forth in the Agreement Document shall be submitted to the City by the deadline to submit requests for information or clarification/questions set forth herein.
G. PROPOSAL CONTENTS
Proposals are to be prepared in such a way as to provide a straightforward, concise delineation of capabilities to satisfy the requirements of this RFP. Colored displays, promotional materials, photographs etc., are not necessary or desired. Emphasis should be concentrated on conformance to RFP instructions, responsiveness to the RFP requirements, and on completeness and clarity of content. Digital dividers and clear organization of content and material are encouraged.
1. Statement of Qualifications (SOQ)
SOQ must include a Table of Contents and be limited to a maximum of 20 pages (excluding City’s required Certifications listed in Section VII below; Proposal Cover Letter, section dividers, table of contents, front/back cover pages). Font size shall be no less than 11. The page limitation includes all appendices, attachments, and supplemental information. Additionally, SOQ must include the following:
a. Cover Letter
Proposals shall include a letter signed by a principal or authorized representative who can make legally binding commitments for the entity. Include type of business entity.
Cover Letter shall not exceed one page.
Cover letter must be addressed to the following City Project Manager:
Jason Gabriel, PE
CIP Engineering Manager
City of Santa Ana – Public Works Agency
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
b. Services Provided
Proposal shall include a Scope of Services and Schedule which detail the work phase to be completed, the tasks to be accomplished, the deliverables to be provided, the schedule/timeline to complete the project, and how they meet the needs of the City as described in Exhibit I – Scope of Services.
c. Agreement Statement
Proposal shall include a statement outlining your concurrence or reference to concerns previously submitted with any and all provisions as contained in EXHIBIT II – Sample Agreement of this RFP (if any).
d. Firm and Team Experience
Proposal shall include a profile of the firm’s experience including the following:
i. A general description of the firm, including size and number of employees working directly with the City on this agreement.
EXHIBIT 2
City Council 22 – 15 5/5/2026
CITY OF SANTA ANA
ii. Firm’s nearest address serving the City of Santa Ana and headquarters address.
iii. Name and contact information of the supervising Project Manager/Principal Agent, to be assigned to the agreement. The Project Manager/Principal Agent shall be the primary contact person to represent your firm and will be the person to conduct the presentation, if invited to an interview. iv. Resumes for all key staff proposed describing relevant experience. e. Proposed Work Plan
Proposal shall include a statement demonstrating the firm’s understanding of the Scope of Services.
Additionally, proposed work plan shall include Proposers’:
i. Anticipated approach to performing services as specified herein; ii. Suggestions or special concerns the evaluation committee should take into consideration (if any);
iii. Description of deliverables and implementation plan. Proposer shall submit a general description of the deliverables, implementation plan, and timeline. f. Relevant Project Experience
Proposal shall include a list of relevant projects, which your firm or personnel have completed within the last 5 years, including significant work with public agencies.
Project information should include project description, project location, year completed, and client name and contact information. City of Santa Ana staff may conduct site visits at select projects.
g. References
References shall be submitted for similar projects performed for state and/or similar government clients.
2. Cost Proposal
All Proposers are required to submit a fixed rate fee with their Cost Proposal. Pricing instructions should be clearly defined to ensure fees proposed can be compared and evaluated. Cost Proposal must include a payment schedule if applicable. City reserves the right to negotiate compensation and/or payment schedule prior to award of any resulting agreement.
If providing hourly rate sheets, Proposer shall not include rate ranges or averages.
The fee proposal shall be submitted separately and concurrently with the technical proposal, electronically in PlanetBids, and as a hard copy in a separately sealed enveloped, clearly labeled as “Fee Proposal.” This shall include the firm’s Standard Hourly Fee Schedule, a table outlining the tasks and team hourly effort for each of the major tasks, and a Project Fee Schedule, as outlined in the Scope of Work.
The City shall not provide reimbursement for travel-related expenses, mileage, parking, lodging, meals, incidental fees, insurance, freight/shipping and handling/delivery, and any EXHIBIT 2
City Council 22 – 16 5/5/2026
CITY OF SANTA ANA
other business expenses, supplies and materials related to providing services as specified herein. Additional costs will not be considered and will not be reimbursed by the City, therefore, such costs must be absorbed in Proposer’s cost proposal fee structure.
Any language related to travel reimbursement shall be stricken from the document by the City and if not stricken, shall be deemed invalid.
Proposals shall be valid for a minimum of one hundred eighty (180) days following Proposal deadline. The cost for developing the Proposal is the sole responsibility of the Proposer. All Proposals submitted become property of the City.
Pricing shall remain firm for the entire initial Agreement term. Thereafter, any proposed pricing adjustment for follow-on renewal periods shall be submitted to the City Representative in writing at least ninety (90) days prior to the new Agreement term. The City reserves the right to accept, reject, or negotiate any proposed pricing adjustment not to exceed the Bureau of Labor Statistics Consumer Price Index (CPI) data as follows:
Los Angeles-Long Beach-Anaheim, CA; All Urban Consumers; Not Seasonally Adjusted; annualized change comparing the most recent month’s reported data to the same month of the prior year. (This information may be found on the U.S. Department of Labor’s website at www.bls.gov.)
H. PROTEST PROCEDURES
Only respondents who have actually submitted a proposal may file a “protest” to an RFP with the City’s Purchasing Department. In order for a Proposer’s protest to be considered valid, the protest must:
1. Be filed in writing before 5:00 p.m. of the 5th business day following the posting of RFP Results/Notice of Intent to Award on the City’s online bidding system;
2. Clearly identify the specific irregularity or accusation;
3. Clearly identify the specific City staff determination or recommendation being protested;
4. Specify, in detail, the grounds of the protest and the facts supporting the protest; and
5. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, it will be rejected as invalid. If the protest is valid, the City’s Purchasing Manager, or other designated City staff member, shall review the basis of the protest and all relevant information. The decision from the Purchasing Manager, or her/her designee, is final and no further appeals will be considered.
VII. CERTIFICATIONS (ATTACHMENTS)
In addition to the SOQ, Narrative/Technical Proposal, and Cost Proposal, the following forms, included in this RFP, shall be signed and included as part of the proposal submittal package:
Attachment A: Proposer’s Certification and Proposal Item Pricing Attachment B: Proposer’s Statement
Attachment C: Non-Collusion Affidavit
Attachment D: Non-Lobbying Certification
EXHIBIT 2
City Council 22 – 17 5/5/2026
CITY OF SANTA ANA
Attachment E: Non-Discrimination Certification
Attachment F: CARB Fleet Compliance Certification
Attachment G: Statement Regarding CWA Requirements-
Attachment H: Sam.gov UEI Verification
Attachment I: Certification Regarding Debarment,
Suspension, Inegibility and Voluntary Exclusion
Attachment J: Federal Funding Requirements
The proposal must be completely responsive to the RFP. Incomplete proposals will be deemed as nonresponsive and will be rejected. The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any commitment will be awarded pursuant to this RFP or otherwise.
PLEASE NOTE:
All forms above must be signed by a representative of the Firm that is legally authorized to contractually bind the Proposer.
City will not waive notarization requirement when applicable on any of the required attachments.
VIII. REFERENCES
Consultant shall provide three (3) references from other similar public agencies for which services similar to those specified in this RFP have been performed, including contact names, telephone numbers and year(s) when performed work. Use ATTACHMENT B – References. The respondent grants permission for the City to contact any individuals listed as references.
City may disqualify a Proposer if:
References fail to substantiate Proposer’s description of services and deliverables provided; or
References fail to support that Proposer has a continuing pattern of providing capable, productive, and skilled personnel, or
City is unable to reach the point of contact with reasonable effort. It is the Proposer’s responsibility to inform the point of contact(s) of normal City working hours.
IX. MINIMUM SCOPE AND LIMIT OF INSURANCE
See Exhibit II – Sample Agreement
X. SELECTION PROCEDURES & CRITERIA
A. The City will establish a proposal review committee. The review committee will evaluate proposals based on the response to the RFP, which includes adherence to outlined directions and format, and the City evaluation criteria set forth below.
EXHIBIT 2
City Council 22 – 18 5/5/2026
CITY OF SANTA ANA
B. Proposers will be ranked by the review committee based on the following criteria:
C. Rankings: A final score will be calculated for each submitted proposal and used to rank Proposers. Based upon the foregoing criteria, all proposals shall be ranked by score. Only those proposals receiving a score above 70 will be considered for award. The City reserves the right to award the Agreement to any proposer(s) with a score above 70. The review committee will evaluate proposers based on their response to the RFP and the City evaluation criteria set forth above.
D. Interviews: The review committee may invite the Proposers to interview. If invited to interview, Proposers must be prepared to include key personnel in the interview and/or presentation.
The City reserves the right to seek additional information from any or all Proposers invited to present proposals. A final score will be calculated for each submitted proposal and used to rank Proposers. City reserves the right to begin negotiations and enter into an Agreement without holding interviews, or further discussions.
E. Selection: The City is under no obligation to accept any proposal and reserves the right to negotiate with respondents as to fees and terms. The City may reject proposals at its sole discretion. If proposal fails to satisfy any requirements outlined in this RFP, it may be considered non-responsive and may be rejected.
The City shall not be obligated to accept the lowest priced proposals, but will make awards in the best interests of the City after all factors have been evaluated. The review committee will recommend the qualified Proposers to the City Council or City Manager for award of Agreement, as appropriate.
CATEGORY POINTS
Firm and Team Experience 40
Proposed Work Plan 25
Relevant Project Experience 15
Schedule of Delivery 15
References 5
TOTAL POSSIBLE SCORE
(Before interviews – if held) 100
Interviews
The City reserves the right to conduct interviews with the highest-rated firm(s). In the event the City does perform an interview process, the following is the maximum number of additive points that may be applied to the proposal score.
20 EXHIBIT 2
City Council 22 – 19 5/5/2026
CITY OF SANTA ANA
XI. WITHDRAWALS
Proposers are responsible for verifying all prices and information before submitting a proposal.
Prior to the proposal due date, the Proposer or Proposer’s representative may withdraw the proposal by providing written notice of the proposal withdrawal to the City Contact/Project Manager. Verbal or telephonic withdrawals are not permissible.
XII. GENERAL TERMS AND CONDITIONS
A. AMERICANS WITH DISABILITIES ACT
The awarded Consultant hereby certifies that it will comply, as applicable, with the Americans with Disabilities Act of 1990 (“ADA”), 42 USC §§ 12101 et seq., and its implementing regulations, including Subtitle A, Title II of the ADA. Consultant will not discriminate against persons with disabilities nor against persons due to their relationship to or association with a person with a disability. Any Agreement entered into by the awarded Consultant (or any subcontract thereof), relating to this RFP, shall be subject to the provisions of this paragraph.
B. CITY BUSINESS LICENSE
The selected Proposer must obtain a City of Santa Ana Business License prior to the execution of an Agreement and must provide a copy to the Buyer assigned to this RFP. The awarded party shall maintain a current business license throughout the term of the resulting Agreement. Procedure to obtain a City of Santa Ana Business License is available by contacting the Finance and Management Services Agency, Business Tax Office at (714) 647- 5447 or on the City’s website: www.santa-ana.org
C. CITY RIGHT TO REJECT
The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any agreement will be awarded pursuant to this RFP or otherwise. The City reserves the right to accept or reject the combined or separate components of this proposal in part or in its entirety or to waive any minor inconsistency, informality or technical defect in the proposal.
D. CONFLICT OF INTEREST
Consultant shall exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict with the best interests of the City. This obligation shall apply to the Consultant; the Consultant’s employees, agents, and SubConsultants associated with accomplishing work and services hereunder. The Consultant’s efforts shall include, but not be limited to, establishing precautions to prevent its employees, agents, and SubConsultants from providing or offering gifts, entertainment, payments, loans or other considerations which could be deemed to influence or appear to influence City staff or elected officers from acting in the best interests of the City.
Each Proposer must disclose any existing or potential conflict of interest relative to the performance of the contractual services resulting from this RFP. Any such relationship that might be perceived or represented as a conflict should be disclosed. The City reserves the right to disqualify any Proposer on the grounds of actual or apparent conflict of interest.
No person, firm, or subsidiary thereof who has been awarded this Agreement may be awarded an Agreement for the provision of services, the delivery of supplies, or the provision of any other related action which is required, suggested, or otherwise deemed appropriate as an end product of this Agreement. Therefore, Consultant is precluded from contracting for any work recommended as a result of this Agreement.
EXHIBIT 2
City Council 22 – 20 5/5/2026
CITY OF SANTA ANA
E. CONSULTANT’S EXPENSE
Pre-Contractual Expenses: The City is not liable for any costs incurred by Proposers prior to entering into a formal Agreement. Costs of developing a response to this RFP, are entirely the responsibility of the Proposer, and shall not be reimbursed in any manner by the City.
Pre-contractual expenses are not to be included in the cost proposal. Pre-contractual expenses include, but are not limited to, preparation of the proposal, submission of the proposal and additional information, attendance at pre-proposal conference, negotiating any matter related to this RFP with City, and/or any other expenses incurred by the Proposer prior to the date of award and execution, if any, of the Agreement.
Other Expenses: The Consultant will be responsible for all costs related to photo copying, telephone communications, fax communications, overhead, travel, and parking while on City sites during the performance of work and services under this Agreement.
F. CONSULTANT’S PROJECT MANAGER/KEY PERSONNEL
Except as formally approved by the City, the key personnel identified in Consultant’s proposal shall be the individuals who will actually complete the work. Changes in staffing must be reported in writing and approved by the City. The City shall have the right to require the removal and replacement of the Consultant’s Project Manager and key personnel under the awarded Agreement. The City shall notify the Consultant in writing of such action. The City is not required to provide any reason, rationale, or additional factual information if it elects to request any specific key personnel be removed from performing services under the awarded Agreement. The City shall review and approve the appointment of the replacement for the Consultant’s personnel. Said approval shall not be unreasonably withheld.
Standards of Conduct: Consultant’s personnel shall be courteous and maintain good working relationships with all stakeholders, state or outside agencies, community members, other team members and staff within the City.
G. COST PROPOSAL
The awarded Consultant agrees to provide the purchased services at the costs, rates, and fees as set forth in their Fee Schedule in response to this RFP. No other costs, rates or fees shall be payable to the awarded SubConsultant for implementation of their proposal.
H. DATA RETENTION
Consultant shall be responsible for retaining data, records, and documentation for the preparation of required items. These materials shall be made available to and as requested by City.
All materials, documents, data or information obtained from the City Data files or any City medium furnished to Consultant in the performance of an awarded Agreement will at all times remain the property of the City. Such data or information may not be used or copied for direct or indirect use by Consultant after completion or termination of this Agreement without the express written consent of the City. All materials, documents, data or information, including copies, must be returned to the City at the end of the Agreement.
All data, documents and other products used, developed, or produced during response preparation of the RFP will become property of the City. All responses to the RFP shall become property of the City. Proposer information identified as proprietary shall be maintained confidential, to the extent allowed under the California Public Records Act.
EXHIBIT 2
City Council 22 – 21 5/5/2026
CITY OF SANTA ANA
I. DRUG-FREE WORKPLACE
The awarded Consultant certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. Failure to comply with these requirements may result in suspension of payments under the Agreement or termination of the Agreement or both, and the Consultant may be ineligible for award of any future City Agreements.
J. EXAMINATION
Proposer represents that it has thoroughly examined and become familiar with the services and responsibilities required by this RFP and that it is capable of effectively and efficiently performing quality work to achieve the City’s objectives. Any attachments referenced herein or any interpretations, clarifications or amendments subsequently posted in relation to this RFP are fully incorporated.
Any irregularities or lack of clarity in the RFP should be brought to the designated City Contact/Project Manager’s attention as soon as possible so that corrective addenda may be furnished to prospective Proposers.
Proposals which appear unrealistic in the terms of technical commitments, lack of technical competence, or are indicative of failure to comprehend the complexity and risk of this Agreement, may be rejected.
K. EXECUTION OF AGREEMENT
Upon successful negotiations, the City and the selected Proposer will enter into an Agreement similar to that as shown in EXHIBIT II – Sample Agreement of this RFP. If a Proposer is unwilling or unable to execute an Agreement within thirty (30) days after being notified of selection under this RFP, the City reserves the right to disqualify them without any further obligation
L. FEDERAL GRANT CONTRACT PROVISIONS
If applicable, proposer must agree to the federal contract provisions outlined in the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards at 2 CFR Part 200.326. These provisions will become part of the agreement resulting from this bid.
M. FISCAL NONFUNDING CLAUSE
In the event sufficient budgeted funds are not available for a new fiscal period, the City shall retain the right to notify the provider of such occurrence in writing at least thirty (30) days before the end of the current fiscal period and terminate the Agreement on the last day of the current fiscal period without penalty or expense to the City. The City’s fiscal period is July 1st through June 30th.
N. INDEPENDENT CONTRACTOR
Consultant is considered an independent Contractor and neither Consultant, its employees, nor anyone working under Consultant will be considered an agent or an employee of City.
Neither Consultant, its employees, nor anyone working under Consultant, will qualify for workers’ compensation or other fringe benefits of any kind through City.
O. JOINT OFFERS/SUBCONSULTANTS
Where two or more Proposers desire to submit a single proposal in response to this RFP, they should do so on a prime sub-consultant basis. The City intends to contract with a single firm, also known as the prime, and not with multiple firms doing business as a joint venture.
Should the use of sub-consultants be offered, the Proposer shall provide the same assurances of competence for the sub-consultant plus the demonstrated ability to manage EXHIBIT 2
City Council 22 – 22 5/5/2026
CITY OF SANTA ANA
and supervise the subcontracted work. Sub-consultants shall not be allowed to further subcontract with others for work under the Agreement. The provisions of the Agreement shall apply to all sub-consultants in the same manner as the Proposer. The proposer is responsible for all the actions taken by their sub-Consultant.
The City reserves the right to reject, replace and approve any and all SubConsultants. All SubConsultant(s) shall be identified in the response to the RFP and the City reserves the right to reject any proposed SubConsultant(s). SubConsultants shall be the responsibility of the prime Consultant and the City shall assume no liability of such SubConsultants.
P. LITIGATION STATUS
Each Proposer must include in its proposal a complete disclosure of any alleged significant prior or ongoing contract failures, any civil or criminal litigation or investigation pending which involves the Proposer or in which the Proposer has been judged guilty or liable. Failure to comply with the terms of this provision will disqualify any proposal. The City reserves the right to reject any proposal based upon the Proposer’s prior history with the City or with any other party, which documents, without limitation, unsatisfactory performance, adversarial or contentious demeanor, significant failure(s) to meet contract milestones or other contractual failures.
Q. NEGOTIATIONS
The City reserves the right to negotiate final Agreement terms with any Proposer selected.
The Agreement between the parties will consist of the RFP together with any modifications thereto, and the awarded Consultant’s proposal, together with any modifications and clarifications thereto that are submitted at the request of the City during the evaluation and negotiation process. In the event of any conflict or contradiction between or among these documents, the documents shall control in the following order of precedence: the final executed Agreement, the RFP, any modifications and clarifications to the awarded Consultant’s proposal, and the awarded Consultant’s proposal. Specific exceptions to this general rule may be noted in the final executed Agreement.
Negotiations shall be confidential and not subject to disclosure to competing Consultants unless and until an agreement is reached. If contract negotiations cannot be concluded successfully, the City reserves the right to negotiate a contract with another Consultant or withdraw the RFP.
R. NON-PAYMENTS
Note that payments will NOT be made for any unsatisfactory work until corrected. In the event of nonpayment of undisputed sums by the City, Consultant shall give the City thirty (30) working days to cure the alleged breach.
S. OWNERSHIP OF DOCUMENTS
The City has permanent ownership of all directly connected and derivative materials produced under this Agreement by the Consultant. All documents, reports and other incidental or derivative work or materials furnished hereunder shall become and remains the sole property of the City and may be used by the City as it may require without additional cost to the City.
Consultant shall provide the City copies of documents upon its request at any time. None of the documents, reports and other incidental or derivative work or furnished materials shall be used by the Consultant without the express written consent of the City.
EXHIBIT 2
City Council 22 – 23 5/5/2026
CITY OF SANTA ANA
T. PARKING
The City will not provide free parking and/or reimbursement for the cost of parking while providing services and conducting business with the City.
U. PROFESSIONAL STANDARDS
Consultant staff shall be courteous to the public and City staff utilizing facilities where Consultant is performing work, but shall be responsive only to the requests of the City’s Project Manager or designee. Consultant staff shall direct all inquiries to Project Manager or designee.
Consultant acknowledges that City locations consist of public-use facilities and recognizes the obligation to ensure Consultant personnel and agents maintain the highest level of professional standards in attire, decorum, and interaction with the public and City personnel.
V. PROJECT MANAGER
The selected Proposer will assume responsibility for all services in its proposal. The selected Proposer shall identify a sole point of contact, Project Manager, with the greatest knowledge in regard to the required service operations and contractual matters, including payment of any and all charges resulting from the Agreement.
W. PROPOSAL VALIDITY
Services, pricing, and warranties indicated in a Proposer’s Proposal must be valid for a period of 180 days at minimum after the submission of the Proposal.
X. PUBLIC AGENCIES
Other public agencies, as defined by California Government Code Section 6500, may choose to use the terms of this Agreement, subject to Consultant’s acceptance. The City is not liable or responsible for any obligations related to a subsequent Agreement between Consultant and another public agency.
Y. PUBLIC RECORDS
Proposals will become public record after the award of an Agreement unless the proposal or specific parts of the proposal can be shown to be exempt by law. Each Proposer may clearly label all or part of a proposal as "CONFIDENTIAL" provided that the Proposer thereby agrees to indemnify and defend the City for honoring such a designation. The failure to so label any information that is released by the City shall constitute a complete waiver of any and all claims for damages caused by any release of the information. Proposer information identified as proprietary shall be maintained confidential, to the extent allowed under the California Public Records Act.
Z. SUBCONSULTANTS
Proposals in response to this RFP must identify any Subconsultants, and outline the contractual relationship between the Awarded Subconsultant and each Subconsultant. An official of each proposed Subconsultant must sign, and include as part of the proposal submitted by the Prime Consultant, a statement to the effect that the Subconsultant has read and will agree to abide by the awarded Consultant’s obligations. Any Subconsultant proposed after award of Agreement must be approved by the City before commencement of work.
The City will look solely to the awarded Consultant for the performance of all contractual obligations which may result from an award based on this RFP, and the awarded Consultant shall not be relieved for the non-performance of any or all Subconsultants.
EXHIBIT 2
City Council 22 – 24 5/5/2026
CITY OF SANTA ANA
XIII. ADDITIONAL TERMS AND CONDITIONS FOR PUBLIC WORKS PROJECTS (AS
APPLICABLE)
A. PREVAILING WAGE
The Director of the Department of Industrial Relations of the State of California has ascertained the prevailing rate of per diem wages in dollars, based on a working day of eight hours, for each craft or type of worker or mechanic needed to execute any construction or maintenance contract, which may be awarded by Public Works. The current prevailing wage rates as adopted by the Director of the Department of Industrial Relations are incorporated herein by reference and may be accessed at http://www.dir.ca.gov/ (General Prevailing Wage determination made by the Director of Industrial Relations / Pursuant to California Labor Code Part 7, Chapter 1, Article 2, Section 1770, 1773 and 1773.1).
Consultant is required to pay the prevailing wage rate referred to above and is responsible for selecting the craft/classification of workers which will be required to perform this service in accordance with the Consultant's method of performing the work. Pursuant to Section 1775 of the Labor Code (State of California) Consultant shall forfeit $50 for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rates for any public work done under this Contract or by any subconsultant.
Prevailing Wage Compliance and Monitoring
Consultant is aware of the requirements of the California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirement on “public works” and “maintenance” projects. Since the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by Prevailing Wage Laws and since the total compensations is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement/Contact. Contact shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant’s principal place of business and at the job site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
B. DIR REGISTRATION
This project is a public work and subject to the following: No Consultant or subconsultant may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No Consultant or subconsultant may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Consultants are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations.
C. CAL-OSHA VEHICLE REGULATION
All vehicles must meet California Motor Vehicle and Cal-OSHA regulations and all other applicable codes required for vehicle use on the roads or highways in the state of California.
EXHIBIT 2
City Council 22 – 25 5/5/2026
CITY OF SANTA ANA
D. QUALITY ASSURANCE
Consultant shall provide laborers and supervisors who are thoroughly familiar with the type of construction involved and materials and techniques specified.
E. CHEMICALS
Handling and delivery of all materials must comply with all local, State, and Federal safety regulations and must maintain appropriate hazardous material transportation and handling certifications and licensing as applicable.
F. SAFETY PROGRAM REQUIREMENTS
Work Site Safety shall be as defined by the Standard Specifications and these special provisions:
Consultant shall be solely responsible for ensuring that all work performed under the contract is performed in strict compliance with all applicable Federal, State and local occupational safety regulations. Consultant/Contractor shall provide at its expense all safeguards, safety devices and protective equipment, and shall take any and all actions appropriate to providing a safe Project site.
The following is required in addition to the requirements of the Standard Specification:
a. Consultant shall train all employees, or subconsultant personnel in the work practices necessary to safely perform his or her job. b. Consultant shall identify all known potential hazards related to the work performed and train all employees and subconsultant personnel on how to handle the potential hazards.
c. Consultant, their employees and subconsultants shall follow all safety rules and safe work practices.
d. Consultant will immediately notify the City of any significant and/or unusual hazards found during the course of work.
e. Consultant shall submit copies of Safety Data Sheets (SDS) for all hazardous materials to be utilized on site in the performance of work. f. Consultant is solely responsible for the legal disposal of hazardous waste generated in the performance of their work.
Safety Indemnification: To the extent allowed by law, the Consultant agrees to defend, indemnify and hold harmless the City, its officers, employees and agents from and against any and all investigations, complaints, citations, liability, expense (including defense costs and legal fees), claims and/or causes of action for damages of any nature whatsoever, including but not limited to injury or death to employees of the Consultant, its subconsultants or City, attributable to any alleged act or omission of the Consultant or its subconsultants which is in violation of any Cal OSHA regulation. The obligation to defend, indemnify and hold harmless includes all investigations and proceedings associated with purported violations of Section 336.10 of Title 8 of the California Code of Regulations pertaining to multi-employer work sites. The City may deduct from any payment otherwise due the Consultant any costs incurred or anticipated to be incurred by the Agency, including legal fees and staff costs, associated with any investigation or enforcement proceedings brought by Cal OSHA arising out of the assigned work.
G. OTHER SAFETY REQUIREMENTS
Consultant shall take all reasonable precautions, as directed by the City, or in the absence of such direction, in accordance with sound industrial practices, to safeguard and protect City EXHIBIT 2
City Council 22 – 26 5/5/2026
CITY OF SANTA ANA
property and adjacent property. Damages to properties caused by Consultant’s negligence shall be repaired at no cost (both labor and material) to the City.
Consultant is responsible for advising and ensuring compliance by Consultant’s employees with all applicable environmental and hazardous materials handling laws and regulations.
Consultant shall provide City a full report of damage to City property and/or equipment by Consultant’s employees. All damage reports shall be submitted to the Site Coordinator within twenty-four (24) hours of occurrence.
Consultant shall provide, erect, and maintain all warning devices (i.e., barricades, cones, etc.) as required or necessary to ensure the safety of the public, City, and Consultant’s employees.
H. SPILL LIABILITY
The City does not assume liability for spills or other releases of hazardous wastes which are caused by the negligence of the Consultant once hazardous waste materials are in the possession of the Consultant or transported off site.
I. RECORDKEEPING AND REPORTS
Consultant is required to provide upon request, detailed data and information required by the City. Information may include: generator EPA ID, Consultant EPA ID, generator name, waste description, manifest number and line number, date waste shipped, disposal and recycling facilities utilized, final disposal method utilized, quantity shipped (pounds), waste profile number, and any additional information requested.
All records and reports shall be available in electronic (including Excel, Word, and PDF Format) and hard copy format at all times during the term of the contract.
XIV. FEDERAL FUNDING REQUIREMENTS
A. FEDERAL AID CONTRACT PROVISIONS
Proposers are advised that this project is federally funded and they shall comply with all federal requirements in the Agreement.
B. CALTRANS ATTACHMENTS
Attachment J includes the required forms for reference and submitting. The forms can be found at: https://dot.ca.gov/programs/local-assistance/forms/local-assistance-proceduresmanual-forms.
Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:https://dot.ca.gov/-/media/dot-media/programs/localassistance/documents/lapm/ch10.pdf XV. AWARD OF AGREEMENT
Selected Consultant(s) will be notified in writing. Any award is contingent upon the successful negotiation of final Agreement terms.
EXHIBIT 2
City Council 22 – 27 5/5/2026
CITY OF SANTA ANA
A. EXECUTION OF AGREEMENT
A standard agreement is included as EXHIBIT II Sample Agreement of this RFP. “Proposer” will hereinafter be referred to as “Consultant” or “Contractor” in standard agreement. The term of the agreement will begin after the agreement is fully executed, and all required bonds, insurance documents and contents of the payment information packet have been received and approved.
XVI. IMPLEMENTATION
A. KICK-OFF MEETINGS
The successful proposer will be required to meet with City staff prior to commencement of services or at any time as required by the City, to discuss and agree on operational issues including transition of services and scheduling.
B. NOTICE TO PROCEED
Prior to issuance of a formal Notice to Proceed (NTP), Consultants shall provide all required bonds, insurance documents, and contents of the Information Packet for review and approval by the City. “On-Call” contracts require the City Project Managers to request a project/task proposal from Consultants on an “as-needed” basis. Proposals will then be evaluated by City Staff and written NTPs will be issued accordingly per task order.
EXHIBIT 2
City Council 22 – 28 5/5/2026
CITY OF SANTA ANA
EXHIBIT I
SCOPE OF SERVICES
EXHIBIT 2
City Council 22 – 29 5/5/2026
SCOPE OF WORK
CITY OF SANTA ANA
REQUEST FOR PROPOSALS
FOR
ENVIRONMENTAL, RIGHT-OF WAY & ENGINEERING DESIGN
SERVICES FOR SANTA ANA BLVD. GRADE SEPARATION
RFP NO. 25-131A
INTRODUCTION/PROJECT DESCRIPTION
The Santa Ana Boulevard Grade Separation Project shall improve safety, pedestrian access, and improve connectivity by separating the existing rail crossing with the Southern California Regional Rail Authority (SCRRA) Orange Line double tracks at Santa Ana Boulevard adjacent to the Santa Ana Regional Transportation Center (SARTC) with a new multimodal underpass. The project shall also reduce the roadway from six- to four-lanes with Class IV protected bikeways and space for future transit expansion. Furthermore, the project enhances pedestrian access by retaining the pedestrian crossing at the intersection of Santa Ana Boulevard and Santiago Street and constructing a new pedestrian bridge spanning over Santa Ana Boulevard, along with sidewalks on both sides of the overcrossing. The current at-grade crossing and the resulting gate arm down time of 2.25 hours per day creates significant barriers within the City. The project addresses transportation challenges for the underserved community and vulnerable road users by improving safety and air quality, eliminating mobility barriers to reconnection, improving emergency response times, and increasing accessibility to intercity passenger rail, bus transit, and the future Orange County Streetcar (OC Streetcar).
The Project shall reconstruct the SCRRA Orange line rail crossing to become a safe, modern, sustainable, and multimodal hub for economic activity and mobility. The Project involves grade separating Santa Ana Boulevard and reducing travel lanes from six- to four-lanes, as well as providing a pedestrian bridge over Santa Ana Boulevard to SARTC, raised medians, protected bikeways, sidewalks, and space for a pedestrian plaza. This shall improve connectivity to nearby commercial opportunities and infill housing, SARTC, the SCRRA railroad corridor, Downtown Santa Ana, Interstate 5 (I-5), and the future OC Streetcar.
At this time, the City is proceeding with development of the Plans, Specifications, and Estimates (PS&E), Environmental Documentation including Technical Studies, Right-of-Way Engineering and Acquisition necessary to prepare for construction of the project.
SCOPE OF SERVICES
The following presents the scope of work for the Environmental Revalidation, PS&E, and Right-of-Way services based upon the selected preferred alternative identified. The selected Consultant is expected to prepare all reports, studies and plans to meet the requirements of all affected agencies. City staff shall provide overall project coordination and shall handle administrative and policy matters. Caltrans, OCTA, SCRRA, the County of Orange, and all other affected agencies shall provide oversight, guidance and interpretation on matters related to their respective policies and regulations.
EXHIBIT 2
City Council 22 – 30 5/5/2026
Services to be performed in response to this RFP include but not limited to:
1. Project Administration
2. Data Collection
3. Coordination
4. Standards
5. Site Survey
6. Environmental Documentation (ED)
7. Roadway Design
8. Railroad & Structural Design
9. Right-Of-Way
10. Utility Coordination & Relocation
11. Traffic Management Plan
12. Agreements & Permits
13. Construction Support
14. Optional Services
The Consultant services shall require review and approval of the design by SCRRA. Formal approval is expected to be provided through execution of both a Design Agreement and a Construction and Maintenance Agreement. The CPUC approval is also required for all modifications to rail crossings. It is anticipated that approval shall be provided through the CPUC General Order 88-B process. The successful team shall provide City staff with all necessary support, applications, drawings, exhibits, meetings, submittals and resubmittals to obtain approvals.
1. PROJECT ADMINISTRATION
This task includes the day-to-day management of the Project. The Consultant Project Manager shall maintain ongoing liaison with the City Project Manager, agency contacts, railroad, regulatory agencies and utility companies to promote effective coordination during the course of project development. The following management and administrative duties shall be performed:
Supervise project staff, subconsultants, coordinate, and monitor work for conformance with set standards and policies
Conduct internal meetings with project staff and subconsultants Apply for and obtain permits necessary for the design team to be on the jobsite Apply for and obtain County and/or City approvals and permits, as necessary Prepare, circulate, and file correspondence and memoranda as appropriate Maintain Project files using specified filing system
Project Development Team (PDT) meetings with the City Project Manager, and other representatives from affected agencies shall be held at least once a month and may be held on a bi-weekly basis. The Consultant shall prepare meeting agendas and minutes for each meeting.
The minutes shall be distributed within 5 working days after the meeting to all attendees. The minutes shall include, but not be limited to, a list of attendees with phone numbers and email, a synopsis of discussion items, any pertinent information, action items, and all follow-ups to the action items.
EXHIBIT 2
City Council 22 – 31 5/5/2026
The Consultant shall monitor quality on all deliverables, calculations, and other work products.
The Consultant shall prepare a Quality Control Plan for all prime and sub-consultant tasks for the project and submit a copy to the City within thirty (30) calendar days of Notice-to- Proceed.
This is not a separate task but shall be included as part of Project Administration. The Consultant shall attend meetings as required to complete the Project, including Caltrans Safety Review meeting, Design Review meetings, Constructability Review meetings, Quality meetings, and informational meetings with stakeholders. Provide the deliverables listed in other sections of the scope of work.
A. Budgeting
The Consultant shall prepare budgets for each task and milestone for the Project. Such budgets shall be entered into the Consultant’s Management Information System along with actual costs incurred and used as a basis for cost monitoring and control.
B. Cost Accounting
Consultant shall prepare monthly reports of expenditures for the Project by task and milestone. Expenditures include direct labor costs, other direct costs and subconsultant costs. These reports shall be included as supporting data for invoices presented to the City every month and shall be in accordance with the City’s invoicing requirements.
C. Quality Control Plan
The Plans, Specifications, and Estimate (PS&E) shall be subject to quality control reviews before submittal. These reviews shall assure conformance to Caltrans and City standards and criteria as well as minimize typographical omissions. Consultant shall submit documentation of the completed QA/QC review.
D. Progress Reporting
Progress reports shall be prepared in accordance with City and grant guidelines. Reports shall be required monthly and shall accompany the invoice.
E. Project Schedule (Critical Path Method Schedule)
Within two (2) weeks from the Notice to Proceed (NTP), the Consultant shall provide a detailed schedule of anticipated services to meet the Scope of Work. Provide a schedule using calendar days with a list of tasks and sub-tasks, milestones, major activities and deliverables, including agencies review time (assume 4 weeks for Caltrans review and agency review of each submittal package), submittal and issuance of needed permits.
Review of the schedule shall occur at subsequent trend meetings. Adjustments shall be made, as necessary, due to changing circumstances. Plans submitted to the City that are incomplete shall be returned to the Consultant unchecked and the Consultant shall be expected to maintain the Project delivery schedule at no additional cost to the City.
Consultant shall be familiar with Caltrans’ plan check submittal procedures and timelines and shall schedule plan check submittals in order to maintain the Project schedule.
EXHIBIT 2
City Council 22 – 32 5/5/2026
F. Risk Assessment
The Consultant shall identify all material risks and harms to the project and the strategies that the lead agency and any project partners need to undertake or will undertake to mitigate those risks, and describe the potential effects of each risk (if any) on meeting the key project delivery schedule milestones presented in the Proposed Schedule. The Consultant shall assess the greatest risks to the project and identify how the project parties will mitigate those risks. A report detailing identified risks shall be prepared by the Consultant and update throughout the project implementation.
2. DATA COLLECTION
The Project shall involve the review and assimilation of a large amount of existing data and the generation of new data. The Consultant shall perform all research of agency records, as necessary, to secure the information, clearances, and/or plan review services required to identify, locate, and accurately layout all of the improvements above and underground within City ROW; private properties affected with the Project; SCRRA; County of Orange; and with Caltrans ROW, Consultant shall accurately layout easements, centerline, ROW, addresses and private property lines.
Perform research of records including utilities and other agency records as necessary to secure information required to identify, locate, and accurately layout all existing utilities, improvements, easements, and rights-of-way within project limits that may interfere with the proposed improvements. The information to be researched shall be, as a minimum, the following:
Review existing utility and street record drawing plans. Perform utility investigation/utility coordination and provide utility relocation recommendations.
Perform an existing utility easement investigation (Prior Rights for proposed relocation).
Coordinate with Consultant’s Right-of-Way Acquisition subconsultant to perform field investigation and measurement to assess existing site conditions. Provide a copy of all utility notifications and responses prior to first progress payment request.
Coordination ROW permits
The Consultant shall determine the ownership rights (utilities in their own easement or utilities by City franchise agreement) of utilities affected by Project construction and shall coordinate and notify the City if any costs are to be paid by the City for utility relocations early in the design process. The Consultant shall track the progress/schedule of the utility company relocation plan preparation in order to have the utility facility relocated prior to construction (preferred) or to ensure final approved utility relocation plans are attached to the City construction plans including the number of working days required by the Utility to construct their facilities clearly identified in the Special Provisions. A utility matrix shall be prepared listing the facility type, construction material, location/depth and disposition of utilities within the Project limits.
EXHIBIT 2
City Council 22 – 33 5/5/2026
The Consultant shall perform all research of private development plans adjacent to or affecting the Project site, as necessary, to secure the information, clearances, and/or plan review services required to identify, locate, and accurately layout all of the above underground improvements and easements, centerline, ROW, and private property lines. The selected Consultant shall be expected to determine what data sources are necessary to gather and by what date, and to prioritize the gathering of that data. Consultant shall research and review all previous work performed to date in the Project vicinity that impacts the design of the improvements, including but not limited to:
Existing improvement plans/engineering reports of record Right-of-way mapping, ownership records (Title Reports) Preliminary engineering and reports for this Project
Environmental clearance and mitigation measures
City/other agency engineering design standards, codes, and plan processing procedures Existing topographic mapping, photos, reports, maintenance reports, “as-built” plans, record maps and surveys, study reports, assessor maps, contract documents, utility index maps, local street improvement/development plans and other pertinent data shall be obtained and reviewed.
In case of conflict, ambiguities, discrepancies, errors, or omissions among the reference materials obtained by Consultant from other agencies, Consultant shall submit the matter to City for clarification. Any work affected by such conflicts, ambiguities, discrepancies, errors or omissions which is performed by Consultant prior to clarification by City shall be at Consultant's risk and expense. In event that non-standard features become apparent during the initial design, Consultant shall prepare the necessary design exceptions following Caltrans or SCRRA and the respective city’s guidelines.
The Consultant shall positively locate all, both high- and low-risk (pothole) utilities in conformance with Government Code 4216 to determine the depth and size for clearance and connection points or conflicts for any underground improvements, such as gas lines and services, electrical lines and services, signal, street lighting, communication lines and services, sewer lines and services, storm drains, or potable and non-potable water lines and services.
The Consultant shall submit to each utility company a preliminary set of plans that provide the location, elevation of the utility, and the elevation of the improvement, with the conflict area clouded to show the utility companies the areas of conflict with the proposed improvement.
Potholing information and plan shall be submitted to the City after completion of this task. If an area of possible conflict was not potholed during the project design phase and the City determines that additional potholing is required, the Consultant shall pothole the area to verify any conflicts at no additional cost to the City. Consultant and Subconsultants shall obtain necessary training including applicable rail safety program prior to performing field investigations. All said training shall be at the sole cost of the Consultant and at no additional cost to the City.
The City expects that the selected team shall make the best use of existing data to minimize waste and duplication of work efforts.
EXHIBIT 2
City Council 22 – 34 5/5/2026
3. COORDINATION
The Consultant shall be fully responsible for the overall management and coordination for the project, which may include, but is not limited to project development team meetings, liaison with affected agencies, and utility companies. Prepare progress report and schedule, securing permits for all field studies and any other required permits from other agencies.
Consultant shall coordinate with City of Santa Ana and its various departments (such as Development Engineering, Traffic Engineering, Water Services, Santa Ana Regional Transportation Center (SARTC), etc..), other involved agencies, private property owners, business owners and developers to ensure a compatible design and phasing of construction with existing and proposed conditions. Coordination may include, but shall not necessarily be limited to the following:
SCRRA
Public Utilities Commission (PUC)
Caltrans District 12
Utility Companies
Orange County Transportation Authority (OCTA) including railroad ROW and bus operations
Other regional bus services
Property business owners and residents
Community engagement is a critical component of this Project. The Consultant team shall responsible to coordinate and manage the community engagement component in conjunction with the City. Consultant shall prepare for, schedule, produce, and manage Community Engagement Meetings at key decision points. Provide renderings for public meetings showing the selected plan. The City anticipates four community meetings, as many as twelve one-onone meetings with property owners and/or business owners, as well as two presentations to Infrastructure Committee, three presentations to the Planning Commission and the City Council of the design during the various progress phases. Based on input, the Consultant shall incorporate changes to the design (when possible) and present the final schematic design to the Community and City Council using colored 3D interactive viewing/navigation of project design alternatives and phases depicting overall look and feel to aide in stakeholders’ and public’s understanding of the proposed improvements.
Consultant shall maintain positive public relations during design through an effective public information program.
The 3D virtual model developed by the Consultant must have the ability to:
a. Interactively view, analyze and present the Project; b. Animate simulations to depict existing and proposed conditions within the Project boundary (buildings, landscape, signage, vehicles, signals, pavement, sidewalk, striping, relevant design features); create virtual tours for public access, create 360˚ and EXHIBIT 2
City Council 22 – 35 5/5/2026
Virtual Reality videos;
c. Present multiple viewpoints or animation paths;
d. View existing conditions and design alternatives;
e. Generate unlimited still images and clipped simulation videos; and f. Be accessible to City and public audiences from any web connected device. A cloud collaboration service shall be provided to enable City to view and navigate the visualization models using standard internet browsers. This service needs to be able to extend to public stakeholders and engage in web-based meetings with shared model viewing, view, and navigate on local desktop computers. The cloud collaboration service shall extend for approximately 24 months (with option to extend as needed).
Training shall also be provided to city staff in order to utilize the service.
Caltrans may exercise review and approval function through the City Project Manager at key points in the development process. All contacts with Caltrans shall be directed through the City Project Manager. Milestone Project design reviews shall be performed for the specific products and deliverables listed herein. The City Project Manager shall conduct these reviews, in addition to the monthly project status reports and meetings. All meetings with other outside reimbursed, and/or paid for, by the City for the amount stipulated on the permit or receipt.
4. STANDARDS
The Project plans, specifications, and estimates for the bridge shall be prepared in accordance with current AASHTO and Caltrans' regulations, policies, procedures, manuals, and standards.
Improvements of local roads may be prepared in accordance with City standards in lieu of Caltrans standards as directed by City. All Documents shall be prepared using US standards and dimensions. Also, compliance with American Railway Engineering and Maintenance-ofWay Association (AREMA) requirements, SCRRA, Railway-Union Pacific Railroad Guidelines for Railroad Grade Separation Project and/or County or City Standards as appropriate. SCRRA standard plans and specifications shall be used for applicable designs.
Roadway, water, sewer, lighting, signal, landscape, traffic striping and signage, traffic control, erosion control and drainage plans shall be prepared on City standard plan and profile sheets.
Design of improvements within Caltrans rights of way may be required per their standard drawings and plans.
Specifications shall be prepared in conformance with the current editions of the City Standard Plans and Specifications, Standard Specifications for Public Works Construction (Greenbook) and Caltrans’ Standard Special Provisions (SSP)s, latest edition. As part of the work involved in the preparation of the plans, specifications and estimates, the Engineer shall prepare and furnish to the City special provisions for items of work included in the plans which are not covered in the City’s Standard Specifications or Greenbook.
In case of conflict, ambiguities, discrepancies, errors, or omissions among the reference materials obtained by Consultant from other agencies, Consultant shall submit the matter to City for clarification. Any work affected by such conflicts, ambiguities, discrepancies, errors or omissions which is performed by Consultant prior to clarification by City shall be at Consultant's risk and expense.
EXHIBIT 2
City Council 22 – 36 5/5/2026
In event that non-standard features become apparent during the initial design, Consultant shall prepare the necessary design exceptions following SCRRA, Caltrans and the respective agency’s guidelines.
5. SITE SURVEY
All surveying work shall be performed by a Licensed Surveyor registered in the State of California and shall be performed by Consultant in accordance with the current Caltrans "Survey Manual" and its revisions. Work not covered by the manual shall be performed in accordance with accepted professional surveying standards. The Consultant shall be responsible to verify datum with the City. Consultant shall obtain applicable encroachment permits prior to beginning any field investigation. Consultant and Subconsultants shall obtain necessary training including applicable rail safety program prior to performing field investigations. All said training shall be at the sole cost of the Consultant and at no additional cost to the City. Additionally, if a traffic control plan is required, Consultant shall prepare the plan. Such documents shall be forwarded to the City, for review and concurrence prior to beginning any field investigation.
Consultant shall perform design surveys including mapping and mapping updates, necessary to complete a constructible PS&E. This includes horizontal and vertical control, drainage surveys, topographical surveys, cross sections, grid grades, open-ended traverses, profile data sheets and required documentation. Surveys performed by Consultant shall conform to the requirements of the Land Surveyors Act and per City’s direction. In accordance with the Act, "responsible charge" for the work shall reside with a Registered Civil Engineer registered prior to January 1, 1982, or a Licensed Land Surveyor, in the State of California.
The surveyor shall complete a topographic survey map of the site to prepare a base map for the project plans and right-of-way engineering. The field survey shall also be required to provide existing property corners (for determination of right-of-way acquisitions), spot elevations, identify any unknown features, identify all known existing utilities in the street and on private property, and cross sections,. Develop a base map of the proposed alignment, including public right-of-way and proposed right-of-way acquisitions with new legal descriptions. Plats, Record of Survey, property lot lines, street centerlines, bench marks, monuments, and control points shall be confirmed and shown on the plans. Consultant is to conduct site visits to identify all existing improvements and conditions that may affect the design and construction of the proposed project and existing site conditions. Provide one (1)- foot contours based on City of Santa Ana vertical datum. Establish street centerlines, right-ofway lines existing and proposed, and all easements from available record information. Provide the basis-of-bearing and benchmark information used for the survey and necessary for construction. Consultant shall locate and tie any features that would affect the design or construction.
Conduct a thorough independent field investigation of the project site to identify pre-existing site conditions and physical constraints of the project area. Consultant shall obtain Record of Surveys, benchmark and centerline tie information. The Consultant shall also coordinate and verify datum with SCRRA as the railroad ROW may not be on the same datum.
EXHIBIT 2
City Council 22 – 37 5/5/2026
6. ENVIRONMENTAL DOCUMENTATION (ED)
A Project Study Report Equivalent (PSRE) was completed and the project was cleared environmentally in 2014 (Appendix __). Coordination with the appropriate federal agencies is required to determine if an Environmental Revalidation or other appropriate level of clearance is necessary based on the passage of time and changed conditions to the project site.
The project funding plan includes Federal, State, and Local funds; therefore, preparation of documents and studies for obtaining compliance with NEPA are required. As all the project funding sources have not been finalized and additional grants are required, the Consultant shall assume NEPA compliance with environmental requirements for both Federal Rail Administration and Federal Highway Administration.
Since the Project is expected to eliminate an existing grade crossing, it is anticipated that the Project shall be statutorily exempt from compliance with CEQA. However, in order to ensure the City is minimizing potential effects on environmental resources, businesses and residents in the area, the Project shall require all technical studies that are typically performed as part of the environmental documentation process.
The Consultant shall prepare a thorough project description defining the limits of projectrelated activities, which shall be used as the basis for environmental technical studies conducted for this project. Pursuant to section 21080.13 of the California Environmental Quality Act (CEQA) and CEQA Guidelines Section 15282(g), the state legislature has determined that railroad grade separations shall be statutorily exempt from CEQA documentation and public disclosure requirements. Accordingly, a more formal CEQA environmental document is not required for this project. However, in certain instances and at the discretion of the sponsoring agency, it is sometimes prudent to undertake certain limited environmental studies in order to better understand and manage the consequences of a particular proposed railroad grade separation. Such is the case for the Santa Ana Blvd. Grade Separation, for which the City and Caltrans has determined that certain selected studies should be undertaken. This scope of work responds to that decision.
As part of the scope of services, the Consultant shall prepare a Notice of Exemption (NOE) and provide to the City for approval and submittal to the State Clearinghouse. In addition, once biological, cultural, noise, and community impact reports have been completed and approved by the City, the Consultant shall prepare a letter report summarizing the findings of these reports, as well as general information related to public outreach that was conducted in support of the project.
Consultant shall develop Project Vicinity and Project Location Maps, as well as a set of maps that clearly shows the location and features of the alternative under consideration. Additionally, base mapping of the environmental components/data. These components/data include Section hazardous materials sites, and land uses and right-of-way sites. Data from publicly available sources shall be used and adjusted, where appropriate, based on field surveys and observations conducted by the Consultant.
Environmental Clearance, Technical studies and other information may be required to be prepared include, but not limited to the following: Natural Environment Studies, Biological EXHIBIT 2
City Council 22 – 38 5/5/2026
Assessments, Initial Site Assessment, Aerial Deposited Lead Report, Asbestos Survey Report, Visual Impact Study, Right-of-Way Impact Study, Relocation Impact Study, Community Impact Assessment, Noise and Vibration Analysis and Technical Study, Cultural Resources Study, Area of Potential Effects (APE) Map. Noise Study/Noise Abatement Decision Report, Air Quality Study, Water Quality Study, Hazardous Waste/Material Phase II Study, Paleontology Study, Wetland Assessments, Protocol Surveys, Tribal Cultural Resources, Archeological Survey Report or other required studies.
Traffic/Circulation Study Update
In addition to the studies identified above, a focused traffic study is required that documents the methodology and results of an analysis performed to evaluate traffic operations for the proposed grade separation of the existing Santa Ana Boulevard/Orange County Transportation Authority (OCTA) Metrolink at-grade crossing in the City of Santa Ana, Orange County, California. The previous Traffic/Circulation Study, conducted in May 2012, evaluated a six-lane Santa Ana Boulevard (Major Arterial). However, the City of Santa Ana adopted the General Plan Mobility Element Update in April 2022. As part of that update, Santa Ana Boulevard between Santiago Street and the Interstate 5 (I-5) southbound off-ramp is proposed to be a four lane Primary Arterial per the Master Plan of Streets and Highways. The traffic study will therefore need to be updated to reflect a four-lane section of Santa Ana Boulevard. The project description is as follows:
East leg of Santiago Street/Santa Ana Boulevard to provide one left-turn, two throughs, and one right-turn lane
Termination of Logan Street north of Santa Ana Boulevard via construction of cul-de-sac Intersection of Fuller Street/Santa Ana Boulevard:
o One NB shared left/through/right
o One SB shared left/through/right
o One EB left-turn lane, one EB through lane, and one EB shared through/right-turn lane
o One WB left-turn lane, one WB through lane, and one WB shared through/rightturn lane West leg of I-5 SB off-ramp/Santa Ana Boulevard to provide dual left-turns and two through lanes
Focused Traffic Study Scenarios
1. Existing Conditions: This section will present an overview of the existing roadway system, transit network, and pedestrian/bicycle facilities within the study area, along with existing traffic volumes, and intersection and roadway levels of service.
2. Opening Year Conditions: Document methodology utilized to develop background opening year traffic forecasts, including ambient growth rates and traffic from future development projects
3. Future Year Conditions: Future year conditions to be based on OCTA’s latest travel demand model, Orange County Transportation Analysis Model (OCTAM).
4. Existing plus Construction Conditions: An analysis of potential impacts during construction of the proposed project (i.e., temporary reduction in capacity).
5. Opening plus Project Conditions: Opening year traffic volumes with project roadway configuration.
EXHIBIT 2
City Council 22 – 39 5/5/2026
6. Future plus Project Conditions: Future year traffic volumes with project roadway configuration.
Traffic Study Area Locations
Focused Traffic Study shall analyze the following intersections and roadway segments, consistent with the City of Santa Ana VMT and Traffic Impact Study Guidelines (September 2019).
1. Santiago Street/Santa Ana Boulevard
2. Fuller Street/Santa Ana Boulevard
3. I-5 SB Off-Ramp/Santa Ana Boulevard
4. Santa Ana Boulevard from Santiago Street to Fuller Street
5. Santa Ana Boulevard from Fuller Street to I-5 SB Off-Ramp Although the project is anticipated to screen out from a VMT analysis due to the reduction in travel lanes, a VMT screening analysis is still required.
Consultant shall prepare a list of the proposed technical studies that would support the benefits of the Project. Consultant shall coordinate and secure approval of Caltrans Environmental review group on the list of studies prior to start of work on the Environmental Clearance effort.
7. ROADWAY DESIGN
All engineering work shall be performed by a Professional Engineer registered in the State of California. All reports, plans, and cost opinions shall be to a level of professional competence that is common among engineers performing like services. All final reports, plans, technical specifications, and cost opinions shall be stamped and signed by the Civil Engineer responsible for the work.
Consultant shall incorporate all environmental requirements and mitigation measures into the design of the project, including, but not limited to, air/water quality, nesting birds/endangered species, etc. into the Project construction documents.
Prepare plans in AutoCAD 2022 .DWG or MicroStation Connect .DGN format and provide an electronic file submittal in the preferred format to the City containing the plans (including all xrefs) along with PDF files. Prepare final drawings for bidding and construction in PDF file format with an additional sets on 24-inch x 36-inch bond paper. The original drawings and digital files shall be the property of the City.
The special provisions and technical specifications section shall be prepared using Microsoft Word conform to the Greenbook and City of Santa Ana boilerplate specifications for the street and utilities portion of the project. Bridge Specifications shall be prepared in conformance with the Caltrans Bridge Design Specifications, Division of Structures current edition. The Consultant shall prepare and furnish special provisions for items of work included in the plans which are not covered in the Standard Specifications, Caltrans-approved standard special provisions, and City approved standard special provisions.
EXHIBIT 2
City Council 22 – 40 5/5/2026
Consultant shall prepare a preliminary cost estimate. Throughout development of the PS&E, Consultant shall update this estimate using the City's cost estimate format with the final estimate due with the plans and specifications. If this cost estimate, or any of the updates, exceeds the Project Cost Budget as provided by the City's project manager, Consultant shall recommend and implement alternatives for reducing the project costs to within the budget.
A. Roadway Design
Roadway or related facilities plans shall be prepared in conformance with the current City Design and Standard Plans for roadway within City right-of-way, and shall be per Caltrans standards and requirements within Caltrans right-of-way. All Roadway plans shall be on single sheet files. Graphic files shall conform to the Caltrans current standards and requirements for Data Format.
B. Drainage Design
Consultant shall prepare and submit hydrologic and hydraulic analyses to support any required storm drain relocation and realignment. Consultant shall prepare Hydraulics and Hydrology Reports as needed to address existing and proposed drainage conditions and any changes caused by the proposed design including mitigation. Consultant shall investigate hydrologic and hydraulic features of the site as necessary to accommodate the grade separation.
Hydraulic and Drainage Engineering, The Consultant’s analysis shall be closely coordinated with the affected properties, and agencies, including the County of Orange, Caltrans and SCRRA. The Design Drainage Report shall quantify the magnitude and frequency of design flows from adjacent areas to the PROJECT area, as well as the volumes attributable to the proposed improvements.
C. Water Quality Plans
Consultant shall prepare a Water Quality Management Plan (WQMP) for the project as required for urban runoff from municipal separate storm sewer systems (MS4 permit). The scope of the WQMP shall include recommendations for post-construction permanent best management practices (BMPs), including source control (structural and non-structural) and treatment BMPs. Recommendations for BMPs shall be incorporated into the project's PS&E. Consultant shall provide base Project data for SWPPP preparation (areas, slopes, etc.).
The construction documents shall require the construction Contractor to engage a licensed engineer to prepare a Storm Water Pollution Prevention Plan (SWPPP) for this Project that covers all items within the scope of work.
D. Landscape and Irrigation plans
Landscape and Irrigation plans shall be prepared in conformance with City’s standards and requirements.
EXHIBIT 2
City Council 22 – 41 5/5/2026
E. Deliverables:
Deliverables shall include, but not be limited to, the following:
1. Plans
Title sheet with location map
Typical sections
Key map and line index
Disposition and demolition plans
Roadway design plans and details
Profiles with super-elevation diagrams
Construction details and construction notes
Drainage layouts, profiles, and details
Signing & Striping plans
Stage construction and traffic handling plan
Detour layout plans
Street light electrical plans and details (temporary and permanent) Construction area sign details
Signal and signal details
Site control and fencing plan and details
Safety barriers plan and details
Sound wall and/or retaining wall plans and details
NPDES erosion control plans
Utility relocation plans and details
Landscaping and Irrigation plans and details
Structure plans and details
Water Quality Management Plan (WQMP)
Storm Water Pollution Plan Preparation (SWPPP)
Miscellaneous details
Aesthetic details
2. Other Deliverables
Construction Cost Estimate
Project Special Provisions and Technical Specifications Provide a minimally detailed construction Critical Path Method (CPM) schedule to support the calculation of the number of Working Days for the Project construction. All technical studies and reports
Drainage reports and calculations
Structural reports and calculations
Retaining Wall/Sound Wall reports and calculations
Traffic Management Plan
F. Plan Checks
Consultant shall submit (3) sets of 24-inch x 36-inch and (3) sets of 11-inch x 17- inch EXHIBIT 2
City Council 22 – 42 5/5/2026
plans on bond paper and the latest construction cost estimate with each submittal (35%, 65%, 95%, 100%, and Final). Consultant shall submit (3) sets of specifications (beginning with the 65% submittal). Paper submittals shall be accompanied by electronic copies (PDF and WORD files) of submittals. The final submittal shall include one (1) set of 24-inch x 36-inch original signed/sealed plans on bond paper, one (1) set of signed/sealed final specifications, appendices, bid form, construction cost estimate, and electronic files as described herein.
G. Bidding Phase Support
Assist the City in providing clarification and prepare information to be used in addenda as needed for questions that may arise during the bidding process. City shall prepare and make available to plan holders any required addenda. Attend the pre-bid meeting and assist the City with bid evaluations and recommendation of bid award.
H. Conformed Plans and Specifications
Prepare conformed plans and specifications for use in constructing the project. The conformed plans and specifications shall reflect changes made during bidding and shall be noted as a revision to the final design plans.
8. RAILROAD & STRUCTURAL DESIGN
A. Railroad & Bridge Design
Bridge plans shall be prepared in accordance with the Caltrans Bridge Design Details Manual, Bridge Design Aids Manual, Bridge Memos to Designers, Division of Structures current edition, and SCRRA standards and design manuals. Consultant shall prepare a concept submittal package as required under SCRRA Grade Separation Projects. The submittal package shall include the proposed plan, elevation, and typical sections of the proposed grade separation showing bridge width and location within the OCTA right-ofway. The submittal package shall also include existing and proposed track lay-outs and any proposed shooflies and construction phasing that shall impact SCRRA facilities or operations. Consultant shall prepare the Structures Memorandum bridge type report and the bridge general plan to comply with the most current SCRRA, AREMA, and CPUC guidelines. The memorandum shall state recommendations for retaining wall types, as required. Consultant shall submit to the City and SCRRA for review and approval.
The bridge type report shall include a discussion of foundation and falsework requirements, seismic and aesthetic considerations, traffic handling requirements and alternatives, and construction cost and staging. In addition, Consultant shall develop an order-of-magnitude construction cost estimate in a format to be specified by the City. Anticipated construction methods shall be identified in the Type Selection process and coordinated with the project geometry. Consultant shall submit Type Selection documents to the City and SCRRA for review and approval. Consultant shall discuss, review, and coordinate the bridge type and retaining wall type selections with the City and SCRRA. These discussions shall include pros and cons for each structure type being considered, including construction costs, schedule, constructability issues, maintenance, and aesthetics.
EXHIBIT 2
City Council 22 – 43 5/5/2026
Consultant shall submit railroad bridge concept and plans to SCRRA via the City for review and approval.
B. Geotechnical Design
Geotechnical design shall be conducted in conformance with current City, Caltrans, and SCRRA standards, design manuals, and requirements.
Consultant shall conduct a site visit to observe the topography and visualize the proposed improvements at the project location. Consultant shall review available subsurface data from nearby structures or published geologic maps, to determine general subsurface conditions at the project site. Geotechnical borings shall be performed by the Consultant.
Consultant shall provide geotechnical, geologic and seismic design recommendations.
Consultant shall provide geotechnical and foundation recommendations for roadway, bridge, retaining walls, and other structures as required.
Consultant shall prepare a geotechnical, materials and bridge foundation report with information gathered during the site visit and review of existing subsurface data, geotechnical borings, results obtained from the alternative analysis and the preliminary bridge and retaining wall foundation data.
Consultant shall prepare and submit a geotechnical review and exploration plan for the City to review. Consultant shall obtain right-of-entry permits prior to exploration. Geotechnical borings within the railroad ROW or adjacent with the potential to foul the tracks will require SCRRA review with right of entry permit, training, and flagging. Consultant shall conduct subsurface investigation and evaluate the results in accordance with specified testing criteria.
Consultant shall analyze the results and present them in the geotechnical report. The geotechnical report shall be prepared to include recommendations for design and construction of bridge foundations, bridge type selection, earth retaining structures, cut and fill slopes, pavement, and drainage facilities.
Results obtained from the field and laboratory testing shall be used to establish an idealized soil profile and strength parameters for bridge foundation design, and slope stability and settlement calculations for the approaches. Consultant shall provide information on remediation measures if the site soils are corrosive to concrete or steel structures. R-value shall be used to determine composite pavement structural sections using Traffic Indices. All reports shall be in accordance with Caltrans procedures, regulations, manuals, standards, policies, and format. The pavement structural sections shall be determined by a qualified Geotechnical Engineer in accordance with Caltrans policies and procedures.
A qualified geotechnical engineer shall prepare a Geotechnical Report for foundation design of the bridge, and roadway pavement and embankment in accordance with Caltrans requirements. Sufficient borings and material samples shall be taken to determine the road structural section and slope stability. Consultant shall propose a Traffic Index (TI) for the all lanes and obtain City and Caltrans concurrence. It shall be the responsibility of the Consultant to notify Underground Service Alert and provide traffic control. Consultant shall tie position EXHIBIT 2
City Council 22 – 44 5/5/2026
of boring locations, with elevation.
The Foundation Report shall also include:
Nature of materials found on the site.
Liquefaction potential.
Any geological hazards that may exist and recommend mitigation measures. Seismic design data in accordance with Caltrans seismic design criteria.
The report shall be developed in accordance with the guidelines for foundation studies and report as referenced in EFPB Information and Procedures Guide and the Bridge Design Aids Manual. It shall be assured that the design parameters and potential construction difficulties are identified and addressed, together with the proper mitigation measures in the Foundation Report. For the bridge structure, alternative types of foundations shall be evaluated to insure the selection of the most suitable type of foundation. A log of Test Borings sheet shall be prepared and included as part of the report and as part of the structure plans. This Foundation Report and Log Test Borings sheet shall be prepared in accordance with Caltrans Standard Procedures and shall be approved by Caltrans.
Laboratory Testing – Bulk and undisturbed samples shall be selected for laboratory testing. All tests shall be conducted in accordance with Caltrans Test Methods or ASTM Standards.
Engineering Analyses – Results obtained from the field and laboratory investigation program shall be used to establish idealized soil profiles and design soil parameters for bridge foundation design.
9. RIGHT-OF-WAY
This Project shall require the acquisition of additional right-of-way. Consultants must demonstrate the minimum qualifications as established in the California Department of Transportation (Caltrans) Right of Way Manual which can be accessed at:
http://www.dot.ca.gov/hq/row/rowman/manual/index
The acquisition process shall be conducted in accordance with applicable codes, procedures and regulations, including California Government Code, Code of Civil Procedure, California Relocation Assistance and the Uniform Relocation Assistance and Real Property Acquisition Policies Act (Uniform Act). City shall review and approve all right-of-way-related work and deliverables. Consultants must demonstrate ability to have successfully negotiated and closed escrow on acquisition of parcels and minimized the eminent domain process on similar projects.
In conjunction with the Environmental Review, the Consultant shall determine right-of-way needs and prepare maps for submittal to the City. The Consultant shall identify the need for new right-of-way, new access control, permanent easements, and temporary construction easements. The Consultant shall coordinate with affected agencies to determine right-of-way impacts (including utility right-of-way needs). The City shall approve right-of-way requirements prior to initiating preparation of right-of-way maps.
EXHIBIT 2
City Council 22 – 45 5/5/2026
The Consultant shall draft all escrow agreements, relocation agreements, temporary and permanent easements, and perform County recordation and all required notices associated with the acquisitions and permits.
The Consultant shall attend regular progress meetings and provide a status update on project progress, schedule, and any critical issues/items and the follow up action items necessary for all acquisitions, relocations, and property management throughout the duration of the ROW phase.
The right-of-way acquisition process shall include, but not be limited to the following:
A. Right-of-Way Maps
The Consultant shall prepare right-of-way base maps in accordance with Caltrans requirements. Base maps shall show existing features consisting of lots along Santa Ana Boulevard with all right-of-way and easement areas, assessor’s parcel numbers, addresses, types of businesses, property lines, footprints of buildings, setback distances from right- of-way to buildings, vegetation, and improvements in the acquisition areas and existing driveways.
The Consultant shall identify all utilities, including those that have prior rights. The Consultant shall identify all improvements including monument signs, cell towers, business signs etc. that shall be removed and or relocated as a part of the Project. The Consultant shall prepare right-of-way maps at a scale approved by Caltrans reflecting all right-of-way for the Project, including acquisitions and easements required for maintenance access, drainage, material sites, utilities, and construction work areas, as necessary. The Consultant shall also show access control. Dimensions are to be shown in English units.
B. Appraisal Maps, Plats, and Descriptions
The Consultant shall coordinate with City’s Right-of-Way Acquisition Consultant to prepare legal descriptions, plats, deeds, and maps for each parcel acceptable to Caltrans and the City for conveyance of marketable title interests and for accurate representation of right-of-way necessary for construction of the Project. The Consultant shall prepare legal descriptions, plats, and maps acceptable to utility companies (as required) and the City for conveyance of marketable title interests and accurate representation of easements necessary for construction of the Project. The Consultant shall prepare a right-of-way maps acceptable to Caltrans. A licensed Appraiser hired by the City shall be responsible preparation of appraisals as required by Caltrans. The appropriately licensed appraiser shall be used for cell towers (if any), signs, etc. Consultant shall provide required documentation to City’s Right-ofWay Acquisition Consultant to allow them to prepare the necessary appraisals for any property required for the Project.
An experienced Right-of-Way Acquisition Consultant hired by the City shall be responsible for right-of-way negotiations and coordination with City representatives. An experienced Relocation Consultant hired by the City shall be responsible for all effort associated with relocations, negotiations and coordination with City EXHIBIT 2
City Council 22 – 46 5/5/2026
representatives.
The Consultant shall prepare necessary Caltrans Local Assistance Paperwork associated with utility relocations.
C. Appraisal Services
Consultant shall prepare appraisal services that include full and partial acquisition for commercial property; industrial property; easements; special use or zoned property; and review appraisals. Appraisal Services shall be in accordance with federal, state, and local regulations, policies, procedures and standards. Consultant must make every effort to meet with the property owner prior to preparation of the report.
D. Acquisition & Relocation Services
The Consultant shall coordinate all the various aspects of the real property acquisition and relocation process, ensuring all work will be performed in accordance with the public agency’s policies and procedures and federal, state and local regulations.
All acquisition/relocation agents, performing work for the City, must hold a valid California Real Estate License. Salespersons must be registered with the California Department of Real Estate (DRE), as working solely under the Consultant’s supervising broker of record.
Consultant shall provide a complete relocation assistance program to comply with the Uniform Act or Title 25, California Code of Regulations, its amendments, and other pertinent laws and regulations. This scope includes the preparation of relocation plans, relocation guidelines, relocation cost estimates, project area surveys and other specialized reports.
E. Property Management Services
Consultant will coordinate all of the property management tasks with City staff and the demolition contractor as deemed necessary. Consultant shall provide post acquisition property management services during the transition from occupancy to demolition. This includes the coordination of utility connections and disconnections, preparing and facilitating short-term rental agreements, rent collections, providing eviction services, property maintenance and security, preparing and issuing notices to vacate in accordance with state law, coordination of final asbestos and lead surveys, and monitoring the demolition of structures and removal of underground storage tanks or other environmental concerns. The property management consultant is required to inspect all City owned properties and to confirm tenancy of occupants.
Consultant shall establish a separate checking account in the name of City and Consultant with the City to be co-owner of the account and have full access at a bank approved by City and conforming with all City policies and procedures.
F. Furniture, Fixtures, Machinery & Equipment (FFME) Appraisal Services EXHIBIT 2
City Council 22 – 47 5/5/2026
Consultant shall complete work under the direction of City staff. Consultant shall, throughout the life of the Agreement retain within Consultant’s firm a staff of qualified personnel to perform each of the work listed below. Consultants shall be responsive and maintain excellent working relationships with property owners, tenants, and City staff.
Consultant shall be committed to provide adequate staffing levels at all times in order to adhere to established schedules. Consultants shall be knowledgeable and very familiar with federal, state and local regulations, policies and procedures as pertain to the right of way services provided.
G. Business Goodwill Appraisal Services
Consultant shall perform professional and technical Loss of Goodwill Appraisal services on an as-needed basis to prepare reports for use during ROW negotiations for the project and settlement during condemnation proceedings. The Loss of Goodwill reports are to be prepared in accordance with all applicable regulations as determined by the City. These may include, but are not limited to local, state and federal regulations, policies, procedures, manuals, and standards including.
10. UTILITY COORDINATION & RELOCATION
This task involves the collection, assembly, and mapping of existing overhead and underground utility lines within the project limits. Perform necessary research to identify all existing utilities and potential conflicts. Pothole existing utilities to verify depth and location.
Provide all required traffic control and surface repair necessary for potholing work.
The intent of the City is that the services of the Consultant shall be complete and “turn-key” with respects to all utility coordination matters, including complete coordination for the protection and relocation of existing facilities as described herein, as well as coordination, preparation of applications, and all other matters pertaining to the relocation and installation of water and electric services, except for those procedures that must be performed by City.
The Consultant shall determine the ownership rights (utilities in their own easement or utilities in by City franchise agreement) of utilities affected by project construction and shall coordinate and notify the City if any costs are to be paid by the City for utility relocations early in the design process.
Consultant shall designate experienced dedicated staff who shall be responsible for all coordination work related to utilities for Project, including but not limited to relocations of existing trunk and mainline facilities, installation of new trunk and mainline facilities, relocation of existing sewer, drainage, communication, electric and water services, and installation of new services.
Consultant shall coordinate with utility owners and City with respect to all utility related matters. Consultant shall provide copies of all correspondence with utility companies and other utility related information to the City. Correspondence, as described herein, shall be prepared by Consultant for either Consultant or City signature, as appropriate, and as directed by the City’s Project Manager.
EXHIBIT 2
City Council 22 – 48 5/5/2026
Consultant shall coordinate with City staff to obtain record copies of utility maps from each utility owner within the project limits for existing and/or proposed utility facilities. Consultant shall include mapping and/or exhibits that clearly define the project limits as part of the requests for utility information. Consultant shall identify utility companies affected by the project and delineate utilities within the project’s sphere of influence on the plans. Consultant shall prepare preliminary plans, which shall include all existing utilities (above ground and below ground) identified by location, size, type, and owner, as appropriate. Consultant shall check horizontal and vertical clearances for utilities and coordinate design with the various utility companies to address conflicts. In addition to information provided by the owning utility companies and through research of other record maps, field surveys shall be used to locate utility features such as manholes, valves, fire hydrants, poles, risers, etc., which shall be reflected on the plans.
Focused coordination and meetings with OCTA and SCRRA on the disposition of utilities within and adjacent to the railroad ROW shall be required.
Consultant shall hire contractor to pothole all utilities that shall be affected with the Project.
Consultant shall coordinate the use of field survey crews to locate potholed utilities by coordinates and elevations based on the project’s survey controls.
Known utility conflicts shall be shown on the plans with construction notes indicating action to be taken and by whom. Inventory numbers of poles, vaults and other surface facilities shall be shown on the plans for those facilities that have such numbers attached to the facility and as provided on the owner’s inventory maps.
Consultant shall send preliminary design plans to owning utility companies within the project limits with requests for review and comments on the plans relevant to their respective facilities, and with requests for other project specific information.
The Consultant shall track the progress/schedule of the utility company relocation plan preparation in order to have the utility facility relocated prior to construction or to ensure final approved utility relocation plans are attached to the City construction plans including the number of working days required by the Utility to construct their facilities clearly identified in the Special Provisions.
A utility matrix shall be prepared listing the facility type, construction material, location/depth and disposition of utilities within the project limits. Consultant shall tie position of boring locations, with elevation.
Consultant shall monitor responses of utility notices received and make recommendations for mitigating conflicts. Consultant shall provide written responses to utility companies with regard to stated concerns and conduct design coordination meetings with utility companies as needed.
Unresolved issues shall be brought to the attention of the City’s Project Manager as early as practical.
Utility conflict issues shall be resolved prior to the completion of the final design plans as follows:
EXHIBIT 2
City Council 22 – 49 5/5/2026
Consultant, through City staff, shall request and obtain a written acknowledgement of any conflicts from the respective utility owners.
Reasonable efforts shall be taken to accommodate utility company requests for minor design changes to accommodate their facilities. Consultant understands that the utility companies are generally operating within the City right-of-way but may have prior rights to that of the City in some cases.
Consultant, through City staff, shall issue mid-design letters with 50% plans which requests utility owner to initiate relocation engineering, funding, property rights checks, etc.
Consultant shall monitor each utility owner that has conflicting facilities and shall obtain relocation plans and other relevant information from utility owner. Consultant shall review relocation plans for conformance with the requirements of the project. Consultant shall coordinate inclusion of special provisions in City’s bid documents for adjustments and relocations of utility facilities as alternate bid items, if requested by the owning utility. Said work may require that cooperative agreements be prepared by City between the City and the owning utility companies. Engineer shall provide information and exhibits as required to support the preparation of cooperative agreements, if needed. Consultant shall conduct utility coordination meetings, as needed, regarding adjustments and relocations, to resolve conflict issues. For utility conflicts that require relocating, Consultant staff shall submit the official notice / order to the utility companies to relocate conflicting facilities. Consultant shall make recommendations for special provision language with regard to utility issues, recommendations for construction windows of time for utility relocation activities, recommendations for inclusion of utility bid items, etc. For utility conflicts with City owned water, sewer, reclaimed pipelines, electrical, Fiber Optic lines, Signal electrical, or storm drain that require relocating, Consultant shall prepare the required relocation plans or new installation plans as necessary to provide biddable Plans and Specifications (turn-key service). City staff shall submit the official notice / order to the utility companies to relocate conflicting facilities. For utility conflicts or improvements within properties that shall be affected with the Project, the Consultant is responsible to prepare the needed plans for relocation or demolitions and re-establishment (such as irrigation, landscape, electrical services, lighting, gas services, communication, etc.) Consultant shall locate and tie any features that would affect the design or construction.
11. TRAFFIC MANAGEMENT PLAN
A Traffic Management Plan (TMP) shall be developed with the objective to provide continuous traffic circulation and access, with adequate space for safe and efficient construction. The TMP will be coordinated with project stakeholders to include but not be limited to:
Orange County Transportation Authority (OCTA)
Southern California Regional Rail Authority (SCRRA)
California Public Utilities Commission (CPUC)
California Department of Transportation (Caltrans)
Businesses
Local neighborhood associations, and
Other public or private agencies/utilities or parties.
EXHIBIT 2
City Council 22 – 50 5/5/2026
The development of the staged construction and traffic detours, closures or alterations to traffic patterns will be included. The plan must detail the use of temporary traffic control devices, such as cones, drums, barricades, and signs, all of which must comply with the California MUTCD. Any temporary roadway must be engineered to the same design standards as new construction, including alignment, pavement, markings, and pedestrian/bicycle facilities.
The TMP shall be developed according to Caltrans TMP Guidelines. TMP strategies include:
Project Description
Public Information
Motorist Information
Incident Management
Construction Strategies
Demand Management
Alternate Routes (or Detours)
Layout Sheets
Typical Cross Sections
Project Schedule
Although the TMP shall be prepared per Caltrans guidelines, it is anticipated that Caltrans review and approval of the TMP shall be limited to portions impacting their right-of-way only.
12. AGREEMENTS & PERMITS
The Consultant shall provide technical support to draft and prepare cooperative agreements, construction and maintenance (C&M) agreements, CPUC approvals, and all noticing required for the project. The Consultant shall provide technical support and prepare necessary documents for the City as required for obtaining all permits needed for construction of the Project.
Consultant shall, on behalf of the City, identify, prepare applications for, and assist in obtaining the permits, clearances and agreements required by OCTA, SCRRA, CPUC, Caltrans, and other public or private agencies/utilities or parties, for construction of the proposed facilities.
The Consultant shall submit permit applications as applicable; attend and organize meetings; revise, edit and resubmit permit applications, plans, and exhibits as needed; and follow up with the agencies as needed to assist the City in securing all required permits. The City shall pay all application and permit fees through the Consultant as part of the agreement.
13. CONSTRUCTION SUPPORT
Consultant shall assist the City during the construction of the project by performing the items below:
a. Engineering Support – Assist the City with the following:
i. Provide professional engineering services to address and respond to Requests for Information (RFI’s) from the contractor,
ii. Review shop drawing and materials submittals,
EXHIBIT 2
City Council 22 – 51 5/5/2026
iii. Prepare supplementary sketches and details as required to resolve field construction problems that may be encountered,
iv. Review and provide recommendations regarding proposed change orders, as needed.
b. Preparation of Record Documents (As-Builts)
The construction contract shall require the contractor to provide to the City for review and approval one set of as-built plans showing the design changes made during the course of construction. Consultant shall prepare record drawings from contractor and construction inspector as-built drawing, markups, and field notes. Submit the following:
i. One (1) electronic submittal with the record drawing files saved in AutoCAD 2022 .DWG or MicroStation Connect .DGN and .PDF formats.
14. OPTIONAL SERVICES
Consultant shall provide separate line items in the cost proposal for the “Optional Services”. City may exclude or include the optional services as part of the awarded contract at City’s discretion. The “Optional Services” shall include the following activities:
a. Construction Staking
b. Other optional service as determined by Consultant
EXHIBIT 2
City Council 22 – 52 5/5/2026
CITY OF SANTA ANA
CONSULTANT AGREEMENT
CITY OF SANTA ANA
THIS AGREEMENT is made and entered into on this day of , 20__ by and between ___________________________________________________________, (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. On _______________, the City issued Request for Proposal No. ______, by which it sought a consultant to provide:
B. Consultant submitted a responsive proposal that was among those selected by the City. Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP No. _______.
C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform the services that were described in the scope of work that was included in RFP No. _______ and as more specifically delineated in Consultant’s proposal, which is attached as Scope of Services – Exhibit A and incorporated in full.
2. ALLOWABLE COSTS AND PAYMENTS
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Compensation - Exhibit B. The total amount to be expended during the term of this Agreement shall not exceed $xxxxxx. This sum is comprised of (1) the base amount of $______________ and (2) a contingency in the amount of $_____________ for additional services at the City’s sole discretion.
b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals and Scope of Work which may reasonably be expected by City.
EXHIBIT II
SAMPLE AGREEMENT
EXHIBIT 2
City Council 22 – 53 5/5/2026
CITY OF SANTA ANA
3. COST PRINCIPLES AND ADMINISTRATIVE REQUIREMENTS
a. Consultant agrees that the Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31.000 et seq., shall be used to determine the cost allowability of individual items.
b. Consultant agrees to comply with federal procedures in accordance with 2 CFR, Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. c. Any costs for which payment has been made to Consultant that are determined by subsequent audit to be unallowable under 2 CFR, Part 200 and 48 CFR, Federal Acquisition Regulations System, Chapter 1, Part 31.000 et seq., are subject to repayment by Consultant to City.
4. TERM
This Agreement shall commence on [enter a Start Date or “the date first written above”] for a number (#) year term with the option for the City to grant up to a number (#)-year renewals, exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 15, below.
5. STATE PREVAILING WAGE RATES
a. If applicable, Consultant shall comply with the State of California’s General Prevailing Wage Rate requirements in accordance with California Labor Code, Section 1770, and all Federal, State, and local laws and ordinances applicable to the work.
b. Any subcontract entered into as a result of this Agreement, if for more than $25,000 for public works construction or more than $15,000 for the alteration, demolition, repair, or maintenance of public works, shall contain all of the provisions of this Section, unless the awarding agency has an approved labor compliance program by the Director of Industrial Relations. c. When prevailing wages apply to the services described in the scope of work, transportation and subsistence costs shall be reimbursed at the minimum rates set by the Department of Industrial Relations (DIR) as outlined in the applicable Prevailing Wage Determination. See http://www.dir.ca.gov.
6. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent Consultant and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employeremployee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
7. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”).
Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual EXHIBIT 2
City Council 22 – 54 5/5/2026
CITY OF SANTA ANA
license for any Documents & Data the subconsultant prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
8. INSURANCE
Prior to undertaking performance of work under this Agreement, Consultant shall maintain and shall require any subcontractors to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City. Total cost of such insurance shall be borne by Consultant.
MINIMUM SCOPE AND LIMIT OF INSURANCE
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence and $4,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies.
2. Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with limits no less than $1,000,000 combined single limits. In the event Consultant does not maintain commercial automobile liability insurance, City will accept evidence of personal automobile insurance, provided that such policy is endorsed for business use and provides coverage with a minimum limit of $1,000,000. Required policy limits can be met with primary and umbrella/excess insurance policies.
3. Workers’ Compensation (WC): as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident, policy or employee, for bodily injury or disease. Coverage is not required if Consultant has no employees and signs request to waive such insurance.
4. Professional Liability (PL) /Errors and Omissions(E&O): with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 aggregate.
If Consultant maintains broader coverage and/or higher limits than the minimum requirements for each line of coverage shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The above required insurance policies are to contain or be endorsed to contain the following provisions:
1. City, its City Council, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds, under Consultant’s CGL and AL policies, with respect to any liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, equipment, and personnel furnished in connection with such work or operations.
2. Consultant’s Insurance company(ies) agrees to waive all rights of subrogation against City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under the terms of Consultant’s CGL, AL, and WC policies which arise from work performed by Consultant under this Agreement.
3. For any claims related to this contract, Consultant’s insurance coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials, employees, agents, or volunteers shall not contribute with it.
4. A severability of interest provision must apply for all the additional insureds, ensuring that Consultant’s insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer’s limits of liability.
EXHIBIT 2
City Council 22 – 55 5/5/2026
CITY OF SANTA ANA
5. Insurance policies required herein shall provide that coverage shall not be canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the carrier, or materially changed except after thirty (30) days prior written notice has been given to City. Ten (10) days prior written notice shall be provided to City for policy cancellation or non-renewal due to non-payment of premium.
6. Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention:
(Name of Department Staff Responsible for Agreement), Address of Department Responsible for Agreement, M-XX, Santa Ana, CA 92701. The name and location of project must be included in the Description of Operations section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the State of California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to City.
Verification of Coverage
Consultant shall furnish City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements before work begins.
However, failure to obtain the required documents prior to the work beginning shall not waive Consultant’s obligation to provide them.
City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
9. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, consultants, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subconsultants, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
EXHIBIT 2
City Council 22 – 56 5/5/2026
CITY OF SANTA ANA
10. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
11. RETENTION OF RECORDS/AUDIT
For the purpose of determining compliance with Public Contract Code 10115, et seq. and Title 21, California Code of Regulations, Chapter 21, Section 2500 et seq., when applicable, and other matters connected with the performance of this Agreement, pursuant to Government Code 8546.7, Consultant, subconsultants, and City shall maintain and make available for inspection all books, documents, papers, accounting records, and other evidence pertaining to the performance of the Agreement, including but not limited to, the costs of administering the Agreement. All parties shall make such materials available at their respective offices at all reasonable times during the Agreement period and for three years from the date of final payment under the Agreement. The state, State Auditor, City, FHWA, or any duly authorized representative of the Federal Government shall have access to any books, records, and documents of Consultant and its certified public accountants work papers that are pertinent to the contract and indirect cost rates (ICR) for audit, examinations, excerpts, and transactions, and copies thereof shall be furnished if requested.
12. AUDIT REVIEW PROCEDURES
a. Any dispute concerning a question of fact arising under an interim or post audit of this Agreement that is not disposed of by mutual agreement shall be reviewed by City’s Executive Director of Finance. b. Not later than 30 days after issuance of the final audit report, Consultant may request a review by City’s Executive Director of Finance of unresolved audit issues. The request for review will be submitted in writing.
c. Neither the pendency of a dispute nor its consideration by City will excuse Consultant from full and timely performance in accordance with the terms of this Agreement.
13. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
14. CONFLICT OF INTEREST CLAUSE
a. Consultant shall disclose any financial, business, or other relationship with City that may have an impact upon the outcome of this Agreement, or any ensuing City construction project. Consultant shall also list current clients who may have a financial interest in the outcome of this Agreement, or any ensuing City construction project that will follow.
b. Consultant hereby certifies that it does not now have, nor shall it acquire any financial or business interest that would conflict with the performance of services under this Agreement.
EXHIBIT 2
City Council 22 – 57 5/5/2026
CITY OF SANTA ANA
15. REBATES, KICKBACKS, OR OTHER UNLAWFUL CONSIDERATION Consultant warrants that this Agreement was not obtained or secured through rebates kickbacks or other unlawful consideration, either promised or paid to any City employee. For breach or violation of this warranty, City shall have the right in its discretion; to terminate the contract without liability; to pay only for the value of the work actually performed; or to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration.
16. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
17. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City.
Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
18. SUBCONTRACTING
a. Nothing contained in this Agreement or otherwise, shall create any contractual relation between City and any subconsultant(s), and no subcontract shall relieve Consultant of its responsibilities and obligations hereunder. Consultant agrees to be as fully responsible to City for the acts and omissions of its subconsultant(s) and of persons either directly or indirectly employed by any of them as it is for the acts and omissions of persons directly employed by Consultant. Consultant’s obligation to pay its subconsultant(s) is an independent obligation from City’s obligation to make payments to the Consultant.
b. Consultant shall perform the work contemplated with resources available within its own organization and no portion of the work pertinent to this Agreement shall be subcontracted without written authorization by City, except that which is expressly identified in the approved Cost Proposal. c. Consultant shall pay its subconsultants within ten (10) calendar days from receipt of each payment made to Consultant by City.
d. All subcontracts entered into as a result of this Agreement shall contain all the provisions stipulated in this Agreement to be applicable to subconsultants.
e. Any substitution of subconsultant(s) must be approved in writing by City prior to the start of work by the subconsultant(s).
19. EQUIPMENT PURCHASE
EXHIBIT 2
City Council 22 – 58 5/5/2026
CITY OF SANTA ANA
a. Prior authorization in writing by City shall be required before Consultant enters into any unbudgeted purchase order, or subcontract exceeding $5,000 for supplies, equipment, or consultant services.
Consultant shall provide an evaluation of the necessity or desirability of incurring such costs. b. For purchase of any item, service or consulting work not covered in Consultant’s Cost Proposal and exceeding $5,000 prior authorization by City, three competitive quotations must be submitted with the request, or the absence of bidding must be adequately justified. c. Any equipment purchased as a result of this Agreement is subject to the following condition: “Consultant shall maintain an inventory of all nonexpendable property. Nonexpendable property is defined as having a useful life of at least two years and an acquisition cost of $5,000 or more. If the purchased equipment needs replacement and is sold or traded in, City shall receive a proper refund or credit at the conclusion of the Agreement, or if the Agreement is terminated, Consultant may either keep the equipment and credit City in an amount equal to its fair market value, or sell such equipment at the best price obtainable at a public or private sale, in accordance with established City procedures and credit City in an amount equal to the sales price. If Consultant elects to keep the equipment, fair market value shall be determined at Consultant’s expense, on the basis of a competent independent appraisal of such equipment. Appraisals shall be obtained from an appraiser mutually agreeable to by City and Consultant. If it is determined to sell the equipment, the terms and conditions of such sale must be approved in advance by City.” 2 CFR, Part 200 requires a credit to Federal funds when participating equipment with a fair market value greater than $5,000 is credited to the project.
20. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Consultants retained by City.
21. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
22. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
23. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the EXHIBIT 2
City Council 22 – 59 5/5/2026
CITY OF SANTA ANA
laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
24. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
25. STATEMENT OF COMPLIANCE
a. Consultant’s signature affixed herein, and dated, shall constitute a certification under penalty of perjury under the laws of the State of California that Consultant has, unless exempt, complied with, the nondiscrimination program requirements of Government Code Section 12990 and Title 2, California Administrative Code, Section 8103.
b. During the performance of this Agreement, Consultant and its subconsultants shall not unlawfully discriminate, harass, or allow harassment against any employee or applicant for employment because of sex, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition (e.g., cancer), age (over 40), marital status, and denial of family care leave. Consultant and subconsultants shall insure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment.
Consultant and subconsultants shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code §12990 (a-f) et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Consultant and its subconsultants shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other Agreement.
c. The Consultant shall comply with regulations relative to Title VI (nondiscrimination in federally-assisted programs of the Department of Transportation – Title 49 Code of Federal Regulations, Part 21 – Effectuation of Title VI of the 1964 Civil Rights Act). Title VI provides that the recipients of federal assistance will implement and maintain a policy of nondiscrimination in which no person in the state of California shall, on the basis of race, color, national origin, religion, sex, age, disability, be excluded from participation in, denied the benefits of or subject to discrimination under any program or activity by the recipients of federal assistance or their assignees and successors in interest. d. The Consultant, with regard to the work performed by it during the Agreement shall act in accordance with Title VI. Specifically, the Consultant shall not discriminate on the basis of race, color, national origin, religion, sex, age, or disability in the selection and retention of subconsultants, including procurement of materials and leases of equipment. The Consultant shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the U.S. DOT’s Regulations, including employment practices when the Agreement covers a program whose goal is employment.
26. DEBARMENT AND SUSPENSION CERTIFICATION
a. Consultant’s signature affixed herein, shall constitute a certification under penalty of perjury under the laws of the State of California, that Consultant has complied with Title 2 CFR, Part 180, “OMB Guidelines to Agencies on Government wide Debarment and Suspension (nonprocurement)”, which certifies that he/she or any person associated therewith in the capacity of owner, partner, director, officer, or manager, is not currently under suspension, debarment, voluntary exclusion, or determination EXHIBIT 2
City Council 22 – 60 5/5/2026
CITY OF SANTA ANA
of ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three (3) years. Any exceptions to this certification must be disclosed to City. b. Exceptions to the Federal Government Excluded Parties List System maintained by the General Services Administration are to be determined by the Federal highway Administration.
27. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
Clerk of the City Council
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
Fax: 714- 647-6956
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-21)
P.O. Box 1988
Santa Ana, California 92702
Fax:
To Consultant:
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
28. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the First & Last Name
Title
Consultant Firm Name
Address
City, State, Zip
Fax:
EXHIBIT 2
City Council 22 – 61 5/5/2026
CITY OF SANTA ANA
event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. The Agreement is the final and complete agreement and any prior or contemporaneous agreements for similar services between the parties is superseded by this Agreement. This shall not apply where the Parties are currently engaged and Consultant is providing services not contemplated by this Agreement.
c. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
Jennifer L. Hall Alvaro Nuñez
City Clerk City Manager
APPROVED AS TO FORM:
SONIA R. CARVALHO CONSULTANT:
City Attorney
By:
Assistant City Attorney
Tax ID#
RECOMMENDED FOR APPROVAL:
Rudolfo Rosas, P.E.
Acting Executive Director
Public Works Agency
SAMPLE ONLY
(name)
(title)
EXHIBIT 2
City Council 22 – 62 5/5/2026
CITY OF SANTA ANA
Federal Regulations – Recipient must comply with the government cost principles, uniform administrative requirements and audit requirements for federal grant program housed within Title 2, Part 200 of the Code of Federal Regulations.
b. Debarment and Suspension – As required by Executive Orders 12549 and 12689, and 2 CFR §200.212 and codified in 2 CFR Part 200, Recipient must provide protection against waste, fraud, and abuse by debarring or suspending those persons deemed irresponsible in their dealings with the Federal government.
c. Audit Records - With respect to all matters covered by this agreement all records shall be made available for audit and inspection by CITY, the grant agency and/or their duly authorized representatives for a period of three (3) years from the date of submission of the final expenditure report by the City of Santa Ana. For a period of three years after final delivery hereunder or until all claims related to this Agreement are finally settled, whichever is later, Recipient shall preserve and maintain all documents, papers and records relevant to the services provided in accordance with this Agreement, including the Attachments hereto. For the same time period, Recipient shall make said documents, papers and records available to City and the agency from which City received grant funds or their duly authorized representative(s), for examination, copying, or mechanical reproduction on or off the premises of Recipient, upon request during usual working hours.
d. Reports - Recipient shall provide to City all records and information requested by City for inclusion in quarterly reports and such other reports or records as City may be required to provide to the agency from which City received grant funds or other persons or agencies. e. Section 504 of the Rehabilitation Act of 1973 (Handicapped) - All recipients of federal funds must comply with Section 504 of the Rehabilitation Act of 1973 (The Act). Therefore, the federal funds recipient pursuant to the requirements of The Act hereby gives assurance that no otherwise qualified handicapped person shall, solely by reason of handicap be excluded from the participation in, be denied the benefits of or be subject to discrimination, including discrimination in employment, in any program or activity that receives or benefits from federal financial assistance. The Recipient agrees it will ensure that requirements of The Act shall be included in the agreements with and be binding on all of its consultants, subconsultants, assignees or successors.
f. Americans with Disabilities Act of 1990 - (ADA) Recipient must comply with all requirements of the Americans with Disabilities Act of 1990 (ADA), as applicable. g. Political Activity - None of the funds, materials, property, or services provided directly or indirectly under this agreement shall be used for any partisan political activity, or to further the election or defeat of any candidate for public office, or otherwise in violation of the provisions of the "Hatch Act". h. No Lobbying - Recipient will comply with all applicable lobbying prohibitions and laws, including those found in the Byrd Anti-Lobbying Amendment (31 U.S.C. 1352, et seq.), and agrees that none of the funds provided under this award may be expended by the Recipient to pay any person to influence, or attempt to influence an officer or employee of any agency, a Member of Congress, an officer
EXHIBIT III
FEDERAL REGULATIONS
EXHIBIT 2
City Council 22 – 63 5/5/2026
CITY OF SANTA ANA
or employee of Congress, or an employee of a Member of Congress in connection with any federal action concerning the award or renewal of any federal contract, grant, loan, or cooperative agreement. i. Non-Discrimination and Equal Opportunity - Recipient will comply, and all its consultants (or subrecipients) will comply, with Title VI of the Civil Rights Act of 1964, as amended; Section 504 of the Rehabilitation Act of 1964, as amended; Subtitle A, Title II of the Americans with Disabilities Act (ADA) (1990); Title IX of the Education Amendments of 1972; the Age Discrimination Act of 1975, as amended; Drug Abuse Office and Treatment Act of 1972, as amended; Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended; Section 523 and 527 of the Public Health Service Act of 1912, as amended; Title VIII of the Civil Rights Act of 1968, as amended; Department of Justice Non-Discrimination Regulations, 28 CFR Part 42, Subparts C, D, E, and G; and Department of Justice regulations on disability discrimination, 28 CFR Part 35 and 39. In the event a Federal or State court, Federal or State administrative agency, or the Recipient makes a finding of discrimination after a due process hearing on the grounds of race, color, religion, national origin, sex, or disability against a recipient of funds, the Recipient will forward a copy of the findings to CITY which will, in turn, submit the findings to the Office of Civil Rights, Office of Justice Programs, U.S. Department of Justice. If applicable, recipient will comply with the equal opportunity clause in 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375. j. Equal Employment Opportunity - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of the Executive Order 11246 of September 24, 1965, entitled “Equal Employment Opportunity,” as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60), as applicable. k. Public Contracts Code - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of the California Public Contract Code Section 10295.3, as applicable. l. Copeland Anti-Kickback Act - Recipient will comply, and all its consultants and subconsultants (or subrecipients) shall comply, with all requirements of the Copeland “Anti-Kickback” Act (30 U.S.C. 3145) as supplemented in Department of Labor regulations (29 CFR Part 3), as applicable.
c. Consultant – Consultants shall comply with 18 U.S.C. § 874, 40 U.S.C. § 3145, and the requirements of 29 C.F.R. pt. 3 as may be applicable, which are incorporated by reference into this contract.
d. Subcontracts – Consultant or subconsultant shall insert in any subcontracts the clause above and such other clauses as FEMA may by appropriate instructions require, and also a clause requiring the subconsultants to include these clauses in any lower tier subcontracts. The prime consultant shall be responsible for the compliance by any subconsultant or lower tier subconsultant with all of these contract clauses. e. Breach – A breach of the contract clauses above may be grounds for termination of the contract, and for debarment as a consultant and subconsultant as provided in 29 C.F.R. § 5.12.
m. Davis-Bacon Act - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable.
EXHIBIT 2
City Council 22 – 64 5/5/2026
CITY OF SANTA ANA
Consultants are required to pay wages to laborers and mechanics at a rate no less than the prevailing wages specified in a wage determination made by the Secretary of Labor.
Additionally, consultants are required to pay wages not less than once a week. n. Work Hours and Safety - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3702 and 3704) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable.
o. Clean Air Act - Recipient will comply, and all its consultants (or subrecipients) will comply, with all applicable standards, orders or requirements issued under the Clean Air Act (42 U.S.C. 7401-7671q), and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as applicable. p. Energy and Conservation - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of the Energy Policy and Conservation Act (42 U.S.C. 6201), as applicable.
q. Waste Disposal - Recipient will comply, and all its consultants (or subrecipients) will comply, with all requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as applicable.
r. Patent Rights - Recipient agrees that the Department of Homeland Security shall have the authority to seek patent rights for any process, product, invention or discovery developed and paid for with funding through this Agreement based on the requirements of 37 CFR§ 401 and any other implementing regulations, as applicable.
s. Copyright - Recipient may copyright any books, publications or other copyrightable materials developed in the course of or under this Agreement. However, the federal awarding agency, State Administrative Agency (SAA) and City reserve a royalty-free, non-exclusive, and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for federal government, SAA and/or City purpose:
(1) the copyright in any work developed through this Agreement; and (2) any rights of copyright to which the subconsultant purchases ownership with support through this grant. The Federal government’s, SAA’s and City’s rights identified above must be conveyed to the publisher and the language of the publisher’s release form must ensure the preservation of these rights.
t. Telecommunications (2 CFR 200.216) - Recipient will comply with FEMA Policy 405-143- 1, Prohibitions on Expending FEMA Award Funds on Covered Telecommunication Equipment or Services (Interim), which prohibits grant recipients and subrecipients from obligating or expending loan or grant funds to procure or obtain, extend or renew a contract to procure or obtain, or to enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
As described in Public Law 115-232, section 889, covered telecommunications equipment is:
EXHIBIT 2
City Council 22 – 65 5/5/2026
CITY OF SANTA ANA
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). (2) For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).
(3) Telecommunications or video surveillance services provided by such entities or using such equipment.
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
u. Domestic preferences for procurements (2 CFR 200.322) - Recipient agrees that as appropriate and to the extent consistent with law, it will, to the greatest extent practicable under a Federal award, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement, and other manufactured products). This requirement must be included in all subawards including all contracts and purchase orders for work or products under this award. For purposes of this provision: “produced in the United States” means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States; and “manufactured products” means items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber. v. Equal Employment in Construction Contracts - Pursuant to Equal Employment Opportunity requirements of 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375, as to any construction contract thereunder, if applicable, during the performance of this contract, the consultant agrees as follows:
(1) The consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
EXHIBIT 2
City Council 22 – 66 5/5/2026
CITY OF SANTA ANA
(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The consultant will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the consultant's legal duty to furnish information. (4) The consultant will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
(5) The consultant will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (6) The consultant will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders.
(7) In the event of the consultant's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
(8) The consultant will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subconsultant or vendor. The consultant will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance.
EXHIBIT 2
City Council 22 – 67 5/5/2026
CITY OF SANTA ANA
For projects with bids greater than $750,000 for prime multi-trade construction contracts (including all subcontractors) or over $100,000 for specialty contracts (contracts either limited to a single trade or craft or limited to a singular scope of work), the CONSULTANT shall adhere to the CITY’S Community Workforce Agreement (CWA). This project is considered a specialty contract. The CWA is a pre-hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONSULTANT to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA is incorporated by reference in the Construction Contract. A copy of the CWA may be on the City’s website at www.santa-ana.org/documents/community-workforceagreement/.
FOR PROPOSERS’ REFERENCE ONLY
EXHIBIT IV
COMMUNITY WORKFORCE AGREEMENT (CWA)
EXHIBIT 2
City Council 22 – 68 5/5/2026
CITY OF SANTA ANA
Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services (Exhibit I) and am qualified to provide services being requested as specified herein. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal.
PROPOSER’S STATEMENT: I have read, understood and agree to the terms and conditions on all pages of the Request for Proposals. Upon request, I will transfer and deliver goods or services to the City in accordance with said terms and conditions.
__________________________________________________________________________________
LEGAL NAME OF COMPANY PHONE AND FAX NUMBERS
__________________________________________________________________________________
BUSINESS ADDRESS
__________________________________________________________________________________
PRINTED NAME OF AUTHORIZED AGENT TITLE
__________________________________________________________________________________
SIGNATURE OF AUTHORIZED AGENT DATE E-MAIL ADDRESS
__________________________________________________________________________________
FEDERAL ID NUMBER (IF APPLICABLE) CONTRACTOR LICENSE NUMBER (IFAPPLICABLE)
__________________________________________________________________________________
CITY OF SANTA ANA BUSINESS LICENSE NUMBER
(PLEASE PROVIDE IF AVAILABLE, BUT NOT REQUIRED UNTIL AND IF AN AWARD IS MADE TO PROPOSER.) THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT A
PROPOSER’S CERTIFICATION, PROPOSAL PRICING
EXHIBIT 2
City Council 22 – 69 5/5/2026
CITY OF SANTA ANA
Proposer understands and agrees that this written RFP (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter City) shall constitute the entire agreement between proposer and the City only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Executive Director or his duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to proposer or deposited with the United States Postal Service properly addressed to the proposer with the correct postage affixed thereto.
Proposer further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish City all required bonds and certificate of liability insurance within ten (10) days (excluding Saturdays, Sundays and City’s legal holidays), or the funds, check, draft, or proposer’s bond substituted in lieu thereof accompanying this proposal shall become the property of the City and shall be considered as payment of damages due to the delay and other causes suffered by City because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered by City is difficult to ascertain; otherwise said funds, check drafts, or proposer’s bond substituted in lieu thereof shall be returned to the undersigned.
Proposer understands that a proposal is required for the entire work, that the estimated quantities set forth in the RFP schedule are solely for the purpose of comparing proposals, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed.
All terms contained in the specifications, the certification of nondiscrimination by contractors, and the required insurance certificates are to be incorporated by reference into this agreement and are made specifically as part of this RFP.
Firm________________________________________________________________________________ Signed and Printed Name: ______________________________________________________________ Title ________________________________________________________________________________ Date
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT B
PROPOSER’S STATEMENT
EXHIBIT 2
City Council 22 – 70 5/5/2026
CITY OF SANTA ANA
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham proposal.
Note: The above non-collusion affidavit is part of the proposal. Signing this proposal on the signature portion thereof shall also constitute signature of this non-collusion affidavit. Proposers are cautioned that making a false certification may subject the certifier to criminal prosecution.
Signed____________________________________________________________________________ State of ________, County of __________________________________________________________ Subscribed and sworn to (or affirmed) before me on this________ day of_____________, 20____, by ________________________, proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.
________________________
Notary Public Signature Notary Public Seal
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT C
NON-COLLUSION AFFIDAVIT
EXHIBIT 2
City Council 22 – 71 5/5/2026
CITY OF SANTA ANA
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT D
NON-LOBBYING CERTIFICATION
EXHIBIT 2
City Council 22 – 72 5/5/2026
CITY OF SANTA ANA
The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows:
1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
1. In the event of the Consultant’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.
2. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract
ATTACHMENT E
NON-DISCRIMINATION CERTIFICATION
EXHIBIT 2
City Council 22 – 73 5/5/2026
CITY OF SANTA ANA
or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a subconsultant or vendor as a result of such direction by the administering agency, the Consultant may request that the United States enter into such litigation to protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
EXHIBIT 2
City Council 22 – 74 5/5/2026
CITY OF SANTA ANA
Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:
The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.
The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.
Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third-party correspondence or vendor bids).
The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).
The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is as follows:
_________________________________________________________________ Bidder’s Company Name (please print or type)
__________________________________________________________________ Signature of Bidder
__________________________________________________________________ Print Name
__________________________________________________________________ Title
___________________________________
DOORS ID
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT F
CARB FLEET COMPLIANCE CERTIFICATION
EXHIBIT 2
City Council 22 – 75 5/5/2026
CITY OF SANTA ANA
This is to certify that the undersigned Proposer and subconsultants have read and undertand the CWA entered into by and between the City of Santa Ana, Los Angeles/Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Local Unions, effective as of June 6, 2023. The Undersigned Proposer hereby agrees to comply with all terms and conditions of the CWA, and are capable of completing construction of the project continuously, without interruptions or delays. If awarded any work covered by the CWA, Proposer will also be required to sign a Letter of Assent that appears as Attachment A to the CWA documents.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT G
STATEMENT REGARDING COMMUNITY WORKFORCE AGREEMENT (CWA)
REQUIREMENTS
EXHIBIT 2
City Council 22 – 76 5/5/2026
CITY OF SANTA ANA
On April 4, 2022, the federal government stopped using the DUNS Number to uniquely identify entities.
Now, entities doing business with the federal government use the Unique Entity ID created in SAM.gov.
They no longer have to go to a third-party website to obtain their identifier. This transition allows the government to streamline the entity identification and validation process, making it easier and less burdensome for entities to do business with the federal government.
This RFP includes federal funding, and as such, the proposer must provide verification of their SAM.gov UEI and registration status. Please attach your entity’s registration from SAM.gov, including UEI and active registration status.
Proposer’s UEI:_______________________________________________ SAM.gov Registration Expiration Date:
ATTACHMENT H
SAM.GOV UEI VERIFICATION
EXHIBIT 2
City Council 22 – 77 5/5/2026
CITY OF SANTA ANA
This certification is required by the regulations implementing Executive Order 12549, as amended, Nonprocurement Debarment and Suspension, 2 CFR Part 2998, Subpart C, Responsibilities of Participants Regarding Transactions. The regulations were published as Part VII of the May 26, 1988, Federal Register (Pages 19160-19211), and as subsequently amended in 81 Federal Register 25585. (Before completing certification, read instructions which are an integral part of certification)
1. Pursuant to 2 CFR 180.335, the prospective primary participant, (i.e. grantee) certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently excluded or disqualified;
b. Have not been convicted within the preceding three years of any of the offenses listed in 2CFR 180.800(a) or had a civil judgment rendered against them for one of those offenses within that time period.
c. Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses listed in 2 CFR 180.800(a);and
d. Have not had one or more public transactions (Federal, State or local) terminated within the preceding three years for cause or default.
2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.
Consultant
Name and Title of Official Authorized to Certify
On Behalf of the Consultant
Date
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
ATTACHMENT I
CERTIFICATE REGARDING DEBARMENT, SUSPENSION, INEGIBILITY AND
VOLUNTARY EXCLUSION
EXHIBIT 2
City Council 22 – 78 5/5/2026
CITY OF SANTA ANA
INSTRUCTION FOR CERTIFICATION
1. By signing and submitting this proposal, the prospective recipient of Federal assistance funds is providing the certification as set out below.
2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective recipient of Federal assistance funds knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the Department of Labor (DOL) may pursue available remedies, including suspension and/or debarment.
3. The prospective recipient of Federal assistance funds shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective recipient of Federal assistance funds learns that its certification was erroneous whom submitted or has become erroneous by reason of changed circumstances.
4. The terms “covered transaction”, “debarment”, “suspension”, “disqualified,” “ineligible”, “lower tier covered transaction”, “participant”, “person”, “primary covered transaction”, “principal”, “proposal”, and “voluntarily excluded”, as used in this cause, have the meanings set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the person to whom this proposal is submitted for assistance in obtaining a copy of those regulations.
5. The prospective recipient of Federal assistance funds agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, disqualified, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the DOL.
6. The prospective recipient of Federal assistance funds agrees by submitting this proposal, that it will include the clause title “Certification Regarding Debarment, Suspension, Ineligible, or voluntarily excluded from the covered transaction” unless it knows that the certification is erroneous.
7. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.
8. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntary excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the DOL may pursue available remedies, including suspension and/or debarment.
EXHIBIT 2
City Council 22 – 79 5/5/2026
CITY OF SANTA ANA
(Refer to the following Forms)
10Q – Disclosure of Lobbying Activities
10R – Sample Contract Language
10S – Consultant Performance Evaluation
10T – Conflict of Interest & Confidentiality Statement 10U – Consultant Management Conflict of interest Statement Link: https://dot.ca.gov/programs/local-assistance/forms/local-assistance-procedures-manual-forms
ATTACHMENT J
CALTRANS REQUIREMENTS
EXHIBIT 2
City Council 22 – 80 5/5/2026
CITY OF SANTA ANA
ATTACHMENT K
NOTICE OF ESTABLISHMENT OF NEW QUIET ZONE - 2014
EXHIBIT 2
City Council 22 – 81 5/5/2026
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
CERTIFIED MAIL RETURN RECEIPT REQUESTED
Distribution is indicated in Section 10 herein
Date: July 21, 2014
Subject: City of Santa Ana, California
Southern California Regional Rail Authority (Metrolink) – Orange Subdivision Quiet Zone
NOTICE OF ESTABLISHMENT (NOE) OF NEW QUIET ZONE
Notice is hereby provided that the City of Santa Ana, California, (City) will establish a New 24-hour Quiet Zone in accordance with the regulatory provisions contained in Title 49 of the Code of Federal Regulations, Parts 222 and 229 Use of Locomotive Horns at Highway-Rail Grade Crossings; Final Rule (Final Rule), effective August 27, 2014. The routine sounding of train horns at crossings will be restricted within the quiet zone.
The following sections describe contents required to be included in the Notice of Quiet Zone Establishment under 49 CFR §222.43(d).
SECTION 1 – AFFECTED HIGHWAY-RAIL CROSSINGS
Two (2) existing public highway-rail at-grade crossings are located within the proposed quiet zone as indicated in Table 1. All crossings are located within the City of Santa Ana in Orange County, CA. All affected streets are under the jurisdiction of the City of Santa Ana. There are no existing private highway-rail at-grade crossings and no pedestrian-exclusive rail at-grade crossings located within the proposed quiet zone.
Table 1: Crossings within the Proposed Quiet Zone
US DOT Crossing Number Milepost Crossing
026702V 101OR-175.10 Santa Ana Boulevard
026703C 101OR-175.40 Fourth Street
EXHIBIT 2
City Council 22 – 82 5/5/2026
.
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
The following railroads currently operate over some or all of the crossings within the proposed quiet zone:
Southern California Regional Rail Authority (SCRRA)
National Railroad Passenger Corporation (Amtrak)
BNSF Railway (BNSF)
Union Pacific Railway (UP)
SECTION 2 – REGULATORY PROVISION FOR ESTABLISHMENT
The quiet zone is proposed to be established based upon the regulatory provision described under 49 CFR §222.39(b). The implementation of Supplemental Safety Measures (SSMs) and Alternative Safety Measures (ASMs) at selected crossings reduces the Quiet Zone Risk Index to a level below the Risk Index with Horns.
The Federal Railroad Administration (FRA) notification of approval letter is attached herein as Exhibit A.
In the Application to the FRA for approval of the ASM treatment at Fourth Street, an effectiveness rate of 0.79 was assumed based on the railroad crossing improvements implemented. Previously, the commercial building on the south side of Fourth Street (east of the railroad tracks) in the southeastern quadrant of the railroad crossing had a private driveway. This access was secured by a locked gate as shown in the image taken from internet mapping (see Figure 1). Based on the previous driveway location, the FRA determined the effectiveness rate in Exhibit A to be a lower at 0.667. However, the image in Figure 1 is outdated because there is no longer a private driveway at that location. The property owner removed the private driveway and gate at this location and replaced both with fencing, sidewalk and curb as shown in the Figures 2 and 3.
Regardless of the existence of the driveway on the south side of Fourth Street, the at-grade railroad crossings qualify for a quiet zone:
either by the originally proposed effectiveness rate, or FRA’s lower effectiveness rate value.
The more conservative FRA effectiveness rate still qualifies this location for a quiet zone and this is acceptable to the City. As part of this NOE letter, the City is providing information regarding the driveway’s status simply as an update and is moving forward based on the FRA’s effectiveness rate value provided.
EXHIBIT 2
City Council 22 – 83 5/5/2026
..
Figure 1
Outdated Internet Image of South Side of Fourth Street Crossing, Looking West Figure 2
Current Image of South Side of Fourth Street Crossing, Looking West Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
EXHIBIT 2
City Council 22 – 84 5/5/2026
..
Figure 3
Current Image of South Side of Fourth Street Crossing, Looking South SECTION 3 – DIAGNOSTIC TEAM REVIEW AND COMMENTS
A diagnostic team review was held with the California Public Utilities Commission (CPUC) and all railroads affected by the proposed quiet zone, listed above in Section 1, were given opportunity to participate. The recommended improvements are addressed and shown in detail on the CPUC General Order 88B Approval documents (attached herein as Exhibit B).
Subsequent to the submission of the General Order 88B documents in Exhibit B, some changes or variations in the design and construction of the grade crossing safety improvements may have been implemented. The implemented improvements are listed in the CPUC Form G (see Exhibit C) and shown in the As-Built Drawings (see Exhibit D).
SECTION 4 – TIME RESTRICTION
Effective August 27, 2014 the routine sounding of horns will be restricted twenty-four (24) hours a day, seven (7) days a week.
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
EXHIBIT 2
City Council 22 – 85 5/5/2026
..
SECTION 5 – GRADE CROSSING INVENTORY PRE-SAFETY MEASURES The Grade Crossing Inventory Forms reflecting the existing conditions at each crossing, listed in Section 1, above, prior to the implementation of SSMs are shown in Exhibit E. The inventory sheets gathered from the FRA website do not reflect the pre-improvement condition. As such, corrections to the pre-safety measures grade crossing inventory sheets in Exhibit E are shown in red.
SECTION 6 – GRADE CROSSING INVENTORY POST SAFETY MEASURES The Grade Crossing Inventory Forms reflecting SSMs and ASMs implemented at each crossing at the time of establishment of the quiet zone are shown in Exhibit F. Updates that reflect the improvements to the crossings are shown in green.
SECTION 7 – PROVISION OF NOTICE OF INTENT
Notice of Intent (NOI) to establish a quiet zone was provided in accordance with 49 CFR §222.43(a)(1) on June 6, 2012.
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
EXHIBIT 2
City Council 22 – 86 5/5/2026
EXHIBIT 2
City Council 22 – 87 5/5/2026
..
SECTION 10 – DISTRIBUTION
This notice has been sent to the following individuals:
Monica M. Suter, PE, PTOE
City of Santa Ana
Senior Civil Engineer
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
Sonia R. Carvalho
City Attorney
City of Santa Ana
20 Civic Center Plaza, M-29
Santa Ana, CA 92701
Commander Ruben Ibarra
Police Department
City of Santa Ana
60 Civic Center Plaza, M-18
Santa Ana, CA 92701
Taig Higgins, PE
Acting City Engineer
City of Santa Ana
20 Civic Center Plaza, M-21
Santa Ana, CA 92701
Michael P. DePallo
Chief Executive Officer
SCRRA
One Gateway Plaza, 12th Floor
Los Angeles, CA 90012
W. Douglas Werner
Associate General Counsel
BNSF Railway Co.
2500 Lou Menk Drive
Fort Worth, TX 76131
John Shurson
Assistant Director, Public Projects
BNSF Railway Co.
740 East Carnegie Drive
San Bernardino, CA 92408-3571
Edwin “William” Galvez, PE
Interim Executive Director Public Works
City of Santa Ana
20 Civic Center Plaza, M-21
Santa Ana, CA 92701
David Cavazos
City Manager
City of Santa Ana
20 Civic Center Plaza, M-31
Santa Ana, CA 92701
Carlos Rojas
Chief of Police
City of Santa Ana Police Department
60 Civic Center Plaza, M-97
Santa Ana, CA 92701
Jennifer Bergener
Manager, Capital Programs
Orange County Transportation Authority
550 South Main Street
PO Box 14184
Orange, CA 92863
Naresh Patel
Manager, Civil Engineering
SCRRA
279 E Arrow Hwy, Suite A
San Dimas, CA 91773
Matthew Keim
Manager Public Projects
BNSF Railway Co.
740 East Carnegie Drive
San Bernardino, CA 92408-3571
Jo Strang
Associate Administrator of Safety
Federal Railroad Administration
RRS-23 Mail Stop 25
1200 New Jersey Avenue
Washington DC 20590
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
EXHIBIT 2
City Council 22 – 88 5/5/2026
..
Daren Gilbert
Rail Crossings Engineering Section
California Public Utilities Commission
180 Promenade Circle, Suite 115
Sacramento, CA 95834-2939
Chi Cheung To
Rail Crossings Engineering Section
California Public Utilities Commission
320 West 4th Street, Suite 500
Los Angeles, CA 90013
Ken Chiang
Rail Crossings Engineering Section
California Public Utilities Commission
320 West 4th Street, Suite 500
Los Angeles, CA 90013
Brian P. Kelly
Acting Secretary
Business, Transportation and Housing
980 9th Street, Suite 2450
Sacramento, CA 95814
Chris Keckeisen
Sr. Manager of Industry & Public Projects
Union Pacific Railroad
2015 S. Willow Avenue
Bloomington, CA 92316
Union Pacific Railroad
Engineering Department
Re: Quiet Zone Establishment
1400 Douglas Street, STOP 0910
Omaha, NE 68179-0910
Ronald Ries
Staff Director, Crossing Safety & Trespass
Prevention
Federal Railroad Administration
RRS-23 Mail Stop 25
1200 New Jersey Avenue
Washington DC 20590
Charles Hagood
Rail Crossing Manager
Federal Railroad Administration
P.O. Box 453
Oakhurst, CA 93944
Ryan Chamberlain
Director – District 12
California Department of Transportation
3347 Michelson Drive, Suite CN380
Irvine, CA 92612
Joseph Boardman
President & CEO
Amtrak
60 Massachusetts Avenue, NE
Washington, DC 20002
Stefan Gilmore
Senior Safety Coordinator
Amtrak
National Railroad Passenger Cooperation
40 Massachusetts Ave., N.E.
Washington, DC 20002
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
EXHIBIT 2
City Council 22 – 89 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibits
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
List of Exhibits:
Exhibit A – FRA Notification of Approval Letter
Exhibit B – CPUC General Order 88B
Exhibit C – CPUC Form G
Exhibit D – As-Built Drawings
Exhibit E – Grade Crossing Inventory Pre Safety Measures Exhibit F – Grade Crossing Inventory Post Safety Measures EXHIBIT 2
City Council 22 – 90 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit A – FRA Notification of
Approval Letter
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 91 5/5/2026
U.S. Department
of Transportation
Federal Railroad
Administration
APR 4 2014
Ms. Monica Suter
Senior Civil Engineer
City of Santa Ana
20 Civic Center Plaza, M-36
Santa Ana, CA 92701
1200 New Jersey Avenue, SE
Washington, DC 20590
Re: THR-000959 (U.S. DOT National Highway-Rail Grade Crossing Inventory Numbers 026702V and 026703C)
Dear Ms. Suter:
The Federal Railroad Administration (FRA) received the quiet zone application you submitted on behalf of the City of Santa Ana (City), California, per Title 49 Code of Federal Regulations (CFR) Section 222.39(b), Public authority application to FRA. FRA approves the application submitted by the City.
FRA finds that the implementation of the supplementary safety measure (SSM) and alternative safety measure (ASM) contained in this application will result in a Quiet Zone Risk Index of 38,502, which is below the Risk Index With Horns (the risk that would be present if the horns were still sounding) of79,385.
The City may submit its Notice of Quiet Zone Establishment in accordance with 49 CFR § 222.43, What notices and other information are required to create or continue a quiet zone? after successful installation of the proposed SSM and ASM and compliance with all applicable quiet zone requirements contained in 49 CFR § 222.35, What are the minimum requirements for quiet zones? The enclosed summary sheet provides a brief discussion ofFRA's comments to the City's application.
EXHIBIT 2
City Council 22 – 92 5/5/2026
If you have any questions or need additional information, please contact Mr. Ron Ries, Staff Director, Highway-Rail Crossing Safety and Trespasser Programs Division, at (202) 493-6285 or [email protected].
Sincerely,
Robert C. Lauby
Associate Administrator for Railroad Safety
Chief Safety Officer
Enclosure
cc: Ms. Sonia R. Varvalho, City of Santa Ana
Commander Douglas McGeachy, City of Santa Ana
Mr. Edwin Galvez, City of Santa Ana
Mr. Raul Godinez II, City of Santa Ana
Mr. David Cavazos, City of Santa Ana
Mr. Carlos Rojas, City of Santa Ana Police Department
Mr. Melvin Thomas, BNSF Railway
Mr. W. Douglas Werner, BNSF Railway
Mr. John Shurson, BNSF Railway
Mr. Brian P. Kelly, Business, Transportation and Housing Mr. Ryan Chamberlain, California Department of Transportation Mr. Daren Gilbert, California Public Utilities Commission Ms. Rosa Munoz, California Public Utilities Commission
Mr. Michael P. DePallo, Southern California Regional Rail Authority Mr. William Doran, Southern California Regional Rail Authority Mr. Naresh Patel, Southern California Regional Rail Authority Ms. Jennifer Bergener, Orange County Transportation Authority Mr. Kenneth Tom, Union Pacific Railroad
Mr. Stefan Gilmore, Amtrak
EXHIBIT
2 2
City Council 22 – 93 5/5/2026
Enclosure
Grade Crossing Application Summary for THR-000959
(For crossings that are considered for the calculation of the Quiet Zone Risk Index) All Crossings:
FRA encourages the City to provide additional traffic control devices (such as signage, pavement markings, etc.) and vegetation control as needed to encourage proper traffic movements for vehicles and/or pedestrians at or across the tracks.
NOTE: The City has provided the Annual Average Daily Traffic (AADT) counts for 2009 and 2011, but requested that FRA consider approval of this application with the 2009 counts.
The City believes that the lower 20 11 AADT reflected a temporary economic downturn in the area of the proposed quiet zone, but that the 2009 AADT provided a more accurate traffic count, and accounted for traffic once the area's economic "climate" returned to a more stable I status. FRA notes that using the City's 2009 AADT data provides a higher risk index related to the application, and will allow a one-time allowance for the use of this data, without establishing precedent for any future applications.
Crossing Number 026702V (Santa Ana Boulevard)
The City proposes a 100-foot non-traversable median curb on the north and south ofthe crossing. The City views this crossing treatment as an SSM with an effectiveness rate of
0.80, which FRA finds consistent with the information provided.
Crossing Number 026703C (4th Street)
The City proposes a 100-foot non-traversable median curb east of the crossing, and entrance and exit gates with vehicle presence detection west of the crossing. The City views this crossing treatment as an ASM with an effectiveness rate of0.79. FRA has determined that an effectiveness rate of 0.667 is more appropriate, given the existence of a commercial driveway in the southeast quadrant of the crossing that vehicles may use to access the crossing. The City is encouraged to use signage and/or engineering design features (e.g., "porkchop," ctirbing, etc.) as needed at or near the driveway to assist motorists with the proper inbound and outbound movements near the crossing.
EXHIBIT 2
City Council 22 – 94 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit B – CPUC General Order 88B
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 95 5/5/2026
EXHIBIT A-1
EXHIBIT 2
City Council 22 – 96 5/5/2026
EXHIBIT 2
City Council 22 – 97 5/5/2026
EXHIBIT 2
City Council 22 – 98 5/5/2026
EXHIBIT 2
City Council 22 – 99 5/5/2026
EXHIBIT A-2
EXHIBIT 2
City Council 22 – 100 5/5/2026
EXHIBIT 2
City Council 22 – 101 5/5/2026
EXHIBIT 2
City Council 22 – 102 5/5/2026
EXHIBIT 2
City Council 22 – 103 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit C – CPUC Form G
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 104 5/5/2026
FORM G
December 9, 2011 Page 1 of 2 Prepared by: M. Ghandehari, P.E./JLP
PUBLIC UTILITIES COMMISSION
OF THE
STATE OF CALIFORNIA
REPORT OF CHANGES AT HIGHWAY GRADE CROSSINGS AND SEPARATIONS MONTH OF December 2011
RAILROAD: SCRRA/METROLINK (CITY OF SANTA ANA - ORANGE SUBDIVISION) THE FOLLOWING CHANGES IN HIGHWAY GRADE CROSSINGS WERE MADE DURING THE YEAR 2011. The Common changes to approved GO-88-B include modifications of fencing and railing to accommodate field conditions. Added additional signage for the pedestrian swing gate and R 15-8 “LOOK” per SCRRA Standard Drawings. Detectable warning tiles were trimmed to clear the #9 counter weights. Future location of the W10-9 “NO TRAIN HORN” sign on 17th Street and Santa Clara to be installed by the City is shown on the as-built drawings. Field adjusted R8-8 to clear line of site for the flashers. (As-built drawings are attached).
Crossing No. County Nature of Change and Reference to Public Authority Date Effective 1 101OR-173.6
DOT 026697B
Orange Fairhaven Avenue Grade Crossing - Implemented safety improvements as authorized by GO-88-B letter dated
07/23/2009.
1. Street was closed into a Cul-De-Sac.
2 101OR-174.2
DOT 02698H
Orange Santa Clara Avenue Grade Crossing - Implemented
safety improvements as authorized by GO-88-B letter
dated 07/23/2009. Modification to the original GO-88-B
are as follows:
1. Added W10-2R and W10-2L signs.
2. Added R3-1 and R13-A signs “No right turn
and No right turn on Red’
3. Added W10-1 signs “RR symbols”.
4. 3 101OR-174.7
DOT 026699P
Orange 17th Street Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
4 101OR-175.1
DOT 026702V
Orange Santa Ana Boulevard Grade Crossing - Implemented safety improvements as authorized by GO-88-B letter
dated 07/23/2009. Modification to the original GO-88-B
are as follows:
1. City of SJC modified median island and striping
on the approaches to the crossing. As a result
of this change median was widened, a #9
median gate for the eastbound traffic was
added, and the traffic striping was changed to
accommodate the City’s improvements.
5 101OR-175.4
DOT 026703C
Orange 4th Street Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
EXHIBIT 2
City Council 22 – 105 5/5/2026
FORM G (continued)
December 9, 2011 Page 2 of 2 Prepared by: M. Ghandehari, P.E./JLP 6 7
8 9
10 101OR-175.8
DOT 026740E
101OR-176.2
DOT 026741L
101OR-176.6
DOT 026742T
101OR-176.7
DOT 026743A
101OR-176.8
DOT 026744G
Orange
Orange
Orange
Orange
Orange
Chestnut Avenue Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
Grand Avenue Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
Lyon Street Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
McFadden Avenue Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
Ritchey Street Grade Crossing - Implemented safety
improvements as authorized by GO-88-B letter dated
07/23/2009.
EXHIBIT 2
City Council 22 – 106 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit D – As-Built Drawings
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 107 5/5/2026
EXHIBIT 2
City Council 22 – 108 5/5/2026
EXHIBIT 2
City Council 22 – 109 5/5/2026
EXHIBIT 2
City Council 22 – 110 5/5/2026
EXHIBIT 2
City Council 22 – 111 5/5/2026
EXHIBIT 2
City Council 22 – 112 5/5/2026
EXHIBIT 2
City Council 22 – 113 5/5/2026
EXHIBIT 2
City Council 22 – 114 5/5/2026
EXHIBIT 2
City Council 22 – 115 5/5/2026
EXHIBIT 2
City Council 22 – 116 5/5/2026
EXHIBIT 2
City Council 22 – 117 5/5/2026
EXHIBIT 2
City Council 22 – 118 5/5/2026
EXHIBIT 2
City Council 22 – 119 5/5/2026
EXHIBIT 2
City Council 22 – 120 5/5/2026
EXHIBIT 2
City Council 22 – 121 5/5/2026
EXHIBIT 2
City Council 22 – 122 5/5/2026
EXHIBIT 2
City Council 22 – 123 5/5/2026
EXHIBIT 2
City Council 22 – 124 5/5/2026
EXHIBIT 2
City Council 22 – 125 5/5/2026
EXHIBIT 2
City Council 22 – 126 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit E – Grade Crossing Inventory
Pre Safety Measures
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 127 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing No.: 026702V Effective Begin-Date of Record:
Part I Location and Classification of Crossing
Railroad:
Division:
Subdivision:
State:
County:
County Map Ref. No.:
City:
Highway Type & No.:
Street or Road Name:
RailRoad I.D. No.:
Nearest RR Timetable Stn:
Branch or Line Name:
Railroad Milepost:
Part II Railroad Information
Southern California Regional Rail Authority [SCAX]
ORANGE
CA
ORANGE
TB 829 G2
SANTA ANA BLVD
OR-175.10
SANTA ANA
0175.10
Number of Daily Train Movements:
Day Thru:
Less Than One Movement Per Day:
Total Trains: Total Switching: 52
No
70 0
Typical Speed Range Over Crossing: From to mph 40 50 Maximum Time Table Speed: 50 Type and Number of Tracks: Main: Other 20
Does Another RR Operate a Separate Track at Crossing? No Does Another RR Operate Over Your Track at Crossing? Yes: ATK BNSF 03/01/12
SANTA ANA
AS OF 5/22/2013
Lat/Long Source:
Type and Positiion: Public At Grade
Update Reason: Changed Crossing
Initiating Agency Railroad
End-Date of Record:
In
HSR Corridor ID:
Latitude: 33.7580990
Longitude: -117.8611150
Parent Railroad: Southern California Regional Rail Authority [SCAX] Crossing Owner: Southern California Regional Rail Authority [SCAX]
ENS Sign Installed: Yes
Passenger Service: AMTRAK & Other
Avg Passenger Train Count: 62
Adjacent Crossing with
Separate Number:
Private Crossing Information:
Category:
Specify Signs:
Railroad Use:
ST/RR A ST/RR B ST/RR C ST/RR D
State Use:
Narrative:
Emergency Contact: Railroad Contact: State Contact: (213)576-7078 Specify:
SCAX
Specify Signals:
Quiet Zone: No
Public Access: Unknown
CHANGES IN EXISTING DATA
01/01/10
101OR-175.10
BNSF, ATK, UPRR
EXHIBIT 2
City Council 22 – 128 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing 026702V
Part III: Traffic Control Device Information
Type of Development: Smallest Crossing Angle:
Number of Traffic Lanes
Crossing Railroad:
Are Truck Pullout Lanes Present?
Is Highway Paved?
Pavement Markings:
Crossing Surface:
Does Track Run Down a
Street?
Nearby Intersecting
Highway?
Part IV: Physical Characteristics
Highway System:
Is Crossing on State
Highway System:
Functional Classification of
Road at Crossing:
Annual Average Daily
Traffic (AADT):
Estimated Percent Trucks:
6 Urban Minor Arterial Other National Highway
009000
10 Continued
Residential 60 to 90 Degrees
No
Yes
Stop Lines and RR Xing
Symbols
Yes
Concrete
No
N/A
No
Effective Begin-Date of Record: 03/01/12
End-Date of Record:
Crossbucks: Highway Stop Signs:
Other Signs:
Train Activated Devices:
Special Warning Devices Not
Train Activated:
Type of Train Detection:
Track Equipped with
Train Signals?
40 2
4 Specify: R15-2
Constant Warning Time
Yes
Gates: 4
Mast Mounted FL: 4
Highway Traffic Signals: 0 Wigwags: 0 Bells: 2
Other Flashing Lights:
Cantilevered FL (Over): 0 Cantilevered FL (Not over): 0 0 Signs:
Advanced Warning: Hump Crossing Sign:
R8-8
4 Quad or Full Barrier:
Total Number FL Pairs: 6
Specify Other Flashing Lights:
Other Train Activated
Warning Devices:
Is Commercial Power Available? Yes
Channelization: All
Traffic Light
Interconnection/Preemption:
Not Interconnected
Is it Signalized? No
Is Crossing Illuminated? Yes
Part V: Highway Information
AADT Year: 1995
Posted Highway Speed: 35
Avg. No of School Buses per Day: 0
If Other:
22500 2009
N/A
01/01/10
2 W48(CA)
EXHIBIT 2
City Council 22 – 129 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing No.: 026703C Effective Begin-Date of Record:
Part I Location and Classification of Crossing
Railroad:
Division:
Subdivision:
State:
County:
County Map Ref. No.:
City:
Highway Type & No.:
Street or Road Name:
RailRoad I.D. No.:
Nearest RR Timetable Stn:
Branch or Line Name:
Railroad Milepost:
Part II Railroad Information
Southern California Regional Rail Authority [SCAX]
ORANGE
CA
ORANGE
TB 829 G3
4TH STREET
OR-175.40
SANTA ANA
0175.40
Number of Daily Train Movements:
Day Thru:
Less Than One Movement Per Day:
Total Trains: Total Switching: 52
No
70 0
Typical Speed Range Over Crossing: From to mph 40 50 Maximum Time Table Speed: 50 Type and Number of Tracks: Main: Other 21
Does Another RR Operate a Separate Track at Crossing? No Does Another RR Operate Over Your Track at Crossing? Yes: ATK BNSF 03/01/12
SANTA ANA
AS OF 5/22/2013
Lat/Long Source: Neither
Type and Positiion: Public At Grade
Update Reason: Changed Crossing
Initiating Agency Railroad
End-Date of Record:
In
HSR Corridor ID:
Latitude: 33.7482990
Longitude: -117.8548970
Parent Railroad: Southern California Regional Rail Authority [SCAX] Crossing Owner: Southern California Regional Rail Authority [SCAX]
ENS Sign Installed: Yes
Passenger Service: AMTRAK & Other
Avg Passenger Train Count: 62
Adjacent Crossing with
Separate Number:
Private Crossing Information:
Category:
Specify Signs:
Railroad Use:
ST/RR A ST/RR B ST/RR C ST/RR D
State Use:
Narrative:
Emergency Contact: (888)446-9721 Railroad Contact: (213)452-0249 State Contact: (213)576-7078 Specify: SPUR
SCAX
Specify Signals:
Quiet Zone: No
Public Access: Unknown
101OR-175.40
CHANGES IN EXISTING DATA
BNSF, ATK, UPRR
0 01/01/10
EXHIBIT 2
City Council 22 – 130 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing 026703C
Part III: Traffic Control Device Information
Type of Development: Smallest Crossing Angle:
Number of Traffic Lanes
Crossing Railroad:
Are Truck Pullout Lanes Present?
Is Highway Paved?
Pavement Markings:
Crossing Surface:
Does Track Run Down a
Street?
Nearby Intersecting
Highway?
Part IV: Physical Characteristics
Highway System:
Is Crossing on State
Highway System:
Functional Classification of
Road at Crossing:
Annual Average Daily
Traffic (AADT):
Estimated Percent Trucks:
4 Urban Minor Arterial Other National Highway
007700
05 Continued
Residential 60 to 90 Degrees
No
Yes
Stop Lines and RR Xing
Symbols
Yes
Concrete
No
N/A
No
Effective Begin-Date of Record: 03/01/12
End-Date of Record:
Crossbucks: Highway Stop Signs:
Other Signs:
Train Activated Devices:
Special Warning Devices Not
Train Activated:
Type of Train Detection:
Track Equipped with
Train Signals?
20 2
0 Specify: R15-2
Constant Warning Time
Yes
Gates: 2
Mast Mounted FL: 2
Highway Traffic Signals: 0 Wigwags: 0 Bells: 2
Other Flashing Lights:
Cantilevered FL (Over): 0 Cantilevered FL (Not over): 0 2 Signs:
Advanced Warning: Hump Crossing Sign: No
4 Quad or Full Barrier: No
Total Number FL Pairs: 4
Specify Other Flashing Lights: MAST
Other Train Activated
Warning Devices:
Is Commercial Power Available? Yes
Channelization: None
Traffic Light
Interconnection/Preemption:
Not Interconnected
Is it Signalized? No
Is Crossing Illuminated? Yes
Part V: Highway Information
AADT Year: 1995
Posted Highway Speed: 30
Avg. No of School Buses per Day: 0
If Other:
35 18500 2009
N/A
01/01/10
W48(CA)
EXHIBIT 2
City Council 22 – 131 5/5/2026
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Sal Tinajero
COUNCILMEMBERS
Angelica Amezcua
P. David Benavides
Michele Martinez
Roman Reyna
Vincent F. Sarmiento
CITY OF SANTA ANA
PUBLIC WORKS AGENCY 20 Civic Center Plaza M-36 ● P.O. Box 1988 M-36 Santa Ana, California 92702
www.santa-ana.org
CITY MANAGER
David Cavazos
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Huizar
Miguel A. Pulido
Mayor
[email protected]
Sal Tinajero
Mayor Pro Tem, Ward 6
[email protected]
Vincent F. Sarmiento
Ward 1
[email protected]
Michele Martinez
Ward 2
[email protected]
Angelica Amezcua
Ward 3
[email protected]
P. David Benavides
Ward 4
[email protected]
Roman Reyna
Ward 5
[email protected]
SANTA ANA CITY COUNCIL
Exhibit F – Grade Crossing Inventory
Post Safety Measures
Orange Subdivision
Southern California Regional Rail Authority
Notice of Establishment of New Quiet Zone
EXHIBIT 2
City Council 22 – 132 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing No.: 026702V Effective Begin-Date of Record:
Part I Location and Classification of Crossing
Railroad:
Division:
Subdivision:
State:
County:
County Map Ref. No.:
City:
Highway Type & No.:
Street or Road Name:
RailRoad I.D. No.:
Nearest RR Timetable Stn:
Branch or Line Name:
Railroad Milepost:
Part II Railroad Information
Southern California Regional Rail Authority [SCAX]
ORANGE
CA
ORANGE
TB 829 G2
SANTA ANA BLVD
OR-175.10
SANTA ANA
0175.10
Number of Daily Train Movements:
Day Thru:
Less Than One Movement Per Day:
Total Trains: Total Switching: 52
No
70 0
Typical Speed Range Over Crossing: From to mph 40 50 Maximum Time Table Speed: 50 Type and Number of Tracks: Main: Other 20
Does Another RR Operate a Separate Track at Crossing? No Does Another RR Operate Over Your Track at Crossing? Yes: ATK BNSF 03/01/12
SANTA ANA
AS OF 5/22/2013
Lat/Long Source:
Type and Positiion: Public At Grade
Update Reason: Changed Crossing
Initiating Agency Railroad
End-Date of Record:
In
HSR Corridor ID:
Latitude: 33.7580990
Longitude: -117.8611150
Parent Railroad: Southern California Regional Rail Authority [SCAX] Crossing Owner: Southern California Regional Rail Authority [SCAX]
ENS Sign Installed: Yes
Passenger Service: AMTRAK & Other
Avg Passenger Train Count: 62
Adjacent Crossing with
Separate Number:
Private Crossing Information:
Category:
Specify Signs:
Railroad Use:
ST/RR A ST/RR B ST/RR C ST/RR D
State Use:
Narrative:
Emergency Contact: Railroad Contact: State Contact: (213)576-7078 Specify:
SCAX
Specify Signals:
Quiet Zone: No
Public Access: Unknown
CHANGES IN EXISTING DATA
01/01/10
101OR-175.10
BNSF, ATK, UPRR
9/30/13
CHANGED CROSSING
OTHER SIGNS NOT LISTED INPART III: 1-W10-2L, 1-W10-2R, 1-R4-7, 1-TYPE N, 1-R10-6(L), 1-R10-6(R), 4-R15-8. 100' MEDIANS. QUEUE-CUTTER SIGNAL. 68 74 57
24 HOUR
EXHIBIT 2
City Council 22 – 133 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing 026702V
Part III: Traffic Control Device Information
Type of Development: Smallest Crossing Angle:
Number of Traffic Lanes
Crossing Railroad:
Are Truck Pullout Lanes Present?
Is Highway Paved?
Pavement Markings:
Crossing Surface:
Does Track Run Down a
Street?
Nearby Intersecting
Highway?
Part IV: Physical Characteristics
Highway System:
Is Crossing on State
Highway System:
Functional Classification of
Road at Crossing:
Annual Average Daily
Traffic (AADT):
Estimated Percent Trucks:
6 Urban Minor Arterial Other National Highway
009000
10 Continued
Residential 60 to 90 Degrees
No
Yes
Stop Lines and RR Xing
Symbols
Yes
Concrete
No
N/A
No
Effective Begin-Date of Record: 03/01/12
End-Date of Record:
Crossbucks: Highway Stop Signs:
Other Signs:
Train Activated Devices:
Special Warning Devices Not
Train Activated:
Type of Train Detection:
Track Equipped with
Train Signals?
40 2
4 Specify: R15-2
Constant Warning Time
Yes
Gates: 4
Mast Mounted FL: 4
Highway Traffic Signals: 0 Wigwags: 0 Bells: 2
Other Flashing Lights:
Cantilevered FL (Over): 0 Cantilevered FL (Not over): 0 0 Signs:
Advanced Warning: Hump Crossing Sign:
R8-8
4 Quad or Full Barrier:
Total Number FL Pairs: 6
Specify Other Flashing Lights:
Other Train Activated
Warning Devices:
Is Commercial Power Available? Yes
Channelization: All
Traffic Light
Interconnection/Preemption:
Not Interconnected
Is it Signalized? No
Is Crossing Illuminated? Yes
Part V: Highway Information
AADT Year: 1995
Posted Highway Speed: 35
Avg. No of School Buses per Day: 0
If Other:
22500 2009
N/A
01/01/10
ADVANCE PREEMPTION
YES
W48(CA)
2 1
4 4
9 PED GATES
9/30/13
EXHIBIT 2
City Council 22 – 134 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing No.: 026703C Effective Begin-Date of Record:
Part I Location and Classification of Crossing
Railroad:
Division:
Subdivision:
State:
County:
County Map Ref. No.:
City:
Highway Type & No.:
Street or Road Name:
RailRoad I.D. No.:
Nearest RR Timetable Stn:
Branch or Line Name:
Railroad Milepost:
Part II Railroad Information
Southern California Regional Rail Authority [SCAX]
ORANGE
CA
ORANGE
TB 829 G3
4TH STREET
OR-175.40
SANTA ANA
0175.40
Number of Daily Train Movements:
Day Thru:
Less Than One Movement Per Day:
Total Trains: Total Switching: 52
No
70 0
Typical Speed Range Over Crossing: From to mph 40 50 Maximum Time Table Speed: 50 Type and Number of Tracks: Main: Other 21
Does Another RR Operate a Separate Track at Crossing? No Does Another RR Operate Over Your Track at Crossing? Yes: ATK BNSF 03/01/12
SANTA ANA
AS OF 5/22/2013
Lat/Long Source: Neither
Type and Positiion: Public At Grade
Update Reason: Changed Crossing
Initiating Agency Railroad
End-Date of Record:
In
HSR Corridor ID:
Latitude: 33.7482990
Longitude: -117.8548970
Parent Railroad: Southern California Regional Rail Authority [SCAX] Crossing Owner: Southern California Regional Rail Authority [SCAX]
ENS Sign Installed: Yes
Passenger Service: AMTRAK & Other
Avg Passenger Train Count: 62
Adjacent Crossing with
Separate Number:
Private Crossing Information:
Category:
Specify Signs:
Railroad Use:
ST/RR A ST/RR B ST/RR C ST/RR D
State Use:
Narrative:
Emergency Contact: (888)446-9721 Railroad Contact: (213)452-0249 State Contact: (213)576-7078 Specify: SPUR
SCAX
Specify Signals:
Quiet Zone: No
Public Access: Unknown
101OR-175.40
CHANGES IN EXISTING DATA
BNSF, ATK, UPRR
0 01/01/10
CHANGED CROSSING
68 74 57
OTHER SIGNS NOT LISTED INPART III: 2-R4-7, 2-TYPE N, 1-TYPE Q (CA), 1-R6-1, 100' MEDIAN. 3 QUAD GATES. 24 HOUR
9/30/13
EXHIBIT 2
City Council 22 – 135 5/5/2026
U.S. DOT - CROSSING INVENTORY INFORMATION
Crossing 026703C
Part III: Traffic Control Device Information
Type of Development: Smallest Crossing Angle:
Number of Traffic Lanes
Crossing Railroad:
Are Truck Pullout Lanes Present?
Is Highway Paved?
Pavement Markings:
Crossing Surface:
Does Track Run Down a
Street?
Nearby Intersecting
Highway?
Part IV: Physical Characteristics
Highway System:
Is Crossing on State
Highway System:
Functional Classification of
Road at Crossing:
Annual Average Daily
Traffic (AADT):
Estimated Percent Trucks:
4 Urban Minor Arterial Other National Highway
007700
05 Continued
Residential 60 to 90 Degrees
No
Yes
Stop Lines and RR Xing
Symbols
Yes
Concrete
No
N/A
No
Effective Begin-Date of Record: 03/01/12
End-Date of Record:
Crossbucks: Highway Stop Signs:
Other Signs:
Train Activated Devices:
Special Warning Devices Not
Train Activated:
Type of Train Detection:
Track Equipped with
Train Signals?
20 2
0 Specify: R15-2
Constant Warning Time
Yes
Gates: 2
Mast Mounted FL: 2
Highway Traffic Signals: 0 Wigwags: 0 Bells: 2
Other Flashing Lights:
Cantilevered FL (Over): 0 Cantilevered FL (Not over): 0 2 Signs:
Advanced Warning: Hump Crossing Sign: No
4 Quad or Full Barrier: No
Total Number FL Pairs: 4
Specify Other Flashing Lights: MAST
Other Train Activated
Warning Devices:
Is Commercial Power Available? Yes
Channelization: None
Traffic Light
Interconnection/Preemption:
Not Interconnected
Is it Signalized? No
Is Crossing Illuminated? Yes
Part V: Highway Information
AADT Year: 1995
Posted Highway Speed: 30
Avg. No of School Buses per Day: 0
If Other:
35 18500 2009
N/A
01/01/10
4 R15-8
W48(CA)
ONE
PED GATES
11 4
2 3
0 9/30/13
EXHIBIT 2
City Council 22 – 136 5/5/2026
CITY OF SANTA ANA
ATTACHMENT L
PROJECT REPORT EQUIVALENT – 2014
EXHIBIT 2
City Council 22 – 137 5/5/2026
EXHIBIT 2
City Council 22 – 138 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT
Vicinity Map
EXHIBIT 2
City Council 22 – 139 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT
This Project Report Equivalent (PRE) has been prepared under the direction of the following registered civil engineer. The registered civil engineer attests to the technical information contained herein and the engineering data upon which recommendations, conclusions, and decisions are based.
12/31/14
Chuanche Ting, P.E. DATE
Project Manager
EXHIBIT 2
City Council 22 – 140 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT i
Table of Contents
1 INTRODUCTION ...................................................................................................................3 2 RECOMMENDATION ...........................................................................................................3 3 BACKGROUND ....................................................................................................................3
3.1 Project History .............................................................................................................. 3
3.2 Community Interaction .................................................................................................. 4
3.3 Existing Facility ............................................................................................................. 4 4 PURPOSE AND NEED .........................................................................................................4
4.1 Need ............................................................................................................................ 4
4.2 Purpose ........................................................................................................................ 5
4.3 Deficiencies .................................................................................................................. 5
4.4 Regional and System Planning ..................................................................................... 5
4.5 Traffic ........................................................................................................................... 5 5 ALTERNATIVES ...................................................................................................................7
5.1 Alternative Description .................................................................................................. 8
5.2 Structure ....................................................................................................................... 9
5.3 Pedestrian Bridge ......................................................................................................... 9
5.4 Stage Construction ....................................................................................................... 9
5.5 Right of Way ................................................................................................................. 9
5.6 Drainage ..................................................................................................................... 10
5.7 Utilities........................................................................................................................ 10
5.8 Cost Estimate ............................................................................................................. 12 6 ENVIRONMENTAL DETERMINATION ...............................................................................13
6.1 Noise Study Report (NSR): ......................................................................................... 13
6.2 Air Quality Assessment Report: .................................................................................. 14
6.3 Initial Site Assessment (ISA): ..................................................................................... 15
6.4 Water Quality Memorandum ....................................................................................... 16
6.5 Natural Environmental Study-Minimum Impact (NES/MI)............................................ 17
6.6 Visual Impact Assessment .......................................................................................... 19
6.7 Relocation Impact Memo ............................................................................................ 20
6.8 Historical Properties Survey Report (HPSR) ............................................................... 20
6.9 Archaeological Survey Report (ASR) .......................................................................... 20
6.10 Historic Resources Evaluation Report (HRER) ........................................................... 21
6.11 Community Impact Assessment (CIA) ........................................................................ 21 7 RAILROAD INVOLVEMENT ...............................................................................................22 8 FUNDING ............................................................................................................................22 9 SCHEDULE ........................................................................................................................22 10 OTHER CONSIDERATIONS AS APPROPRIATE ...............................................................23
10.1 Permits ....................................................................................................................... 23
10.2 Involvement with a Navigable Waterway .................................................................... 23
10.3 Graffiti Control ............................................................................................................ 23
10.4 Geotechnical Investigation.......................................................................................... 23 11 PROJECT PERSONNEL.....................................................................................................24 12 ATTACHMENTS .................................................................................................................25 Attachment A: Highway-Rail Crossing Accident/Incident Reports ................................... A Attachment B: Project Layout, Typical Section, and Profile ............................................. B Attachment C: Bridge General Plan ................................................................................ C Attachment D: Pedestrian Bridge Typical Section ........................................................... D EXHIBIT 2
City Council 22 – 141 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT ii
Attachment E: Staging and Traffic Handling .................................................................... E Attachment F: Shoofly .................................................................................................... F Attachment G: Right-of-Way Acquisition Map .................................................................. G Attachment H: Existing & Proposed Utilities .................................................................... H Attachment I: Cost Estimate ............................................................................................ I Attachment J: Preliminary Environmental Study (PES) .................................................... J Attachment K: Categorical Exemption/Categorical Exclusion Determination Form .......... K Attachment L: Environmental Commitment Record ......................................................... L Attachment M: Project Schedule...................................................................................... M Attachment N: Geotechnical Technical Memorandum ..................................................... N List of Tables
Table 1 - Summary of Accident Data from the CPUC ..................................................... 5 Table 2 - Rail-Highway Grade Crossing Delay Analysis without Project ......................... 6 Table 3 - Intersection LOS .............................................................................................. 7 Table 4 - Cost Breakdown ............................................................................................. 13 Table 5 - Environmental Concerns ................................................................................ 16 Table 6 - Project Milestone Preliminary Dates .............................................................. 23 EXHIBIT 2
City Council 22 – 142 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 3
1 INTRODUCTION
The City of Santa Ana (City) and Orange County Transportation Authority (OCTA), in cooperation with Caltrans and the Federal Highway Administration (FHWA), propose to grade separate the current at-grade crossing of Santa Ana Boulevard with the Southern California Regional Rail Authority (SCRRA) double tracks. The project objective is to eliminate the at-grade crossing of the railroad traffic and the vehicular traffic; improve safety at the crossing for pedestrians, bicyclists and motorists; provide unimpeded access for emergency responders; and, enhance traffic operations and reduce existing traffic congestion and delay.
Both an overhead alternative and an underpass alternative were considered. The overhead alternative was deemed non-viable because of concerns and opposition expressed by members of an adjacent neighborhood. A No-Build Alternative was not considered, with the exception of within the traffic studies discussed later in this report, as it does not meet the project objective.
The preferred alternative will construct a railroad underpass structure to carry SCRRA trains over Santa Ana Boulevard, depressing the current grade of the roadway and maintaining the railroad profile. Project cost for the preferred alternative has been estimated to be approximately $73.3 million, which includes $45 million for construction, $15.6 million for right-of-way acquisition, and $12.7 million for administration support. Tentatively, the project will be funded by a combination of federal, state, and local funds.
2 RECOMMENDATION
It is recommended that the project be approved using the Preferred Alternative (underpass structure) and that the project proceed to the design phase. Local agency concurrence for the project has been obtained as the local agency (City of Santa Ana) is the lead agency. 3 BACKGROUND
3.1 Project History
This highway-rail at-grade crossing is located along the Los Angeles to San Diego (LOSSAN) Corridor, which is the primary north/south rail corridor connecting the cities of Los Angeles and San Diego, as well as cities in between including some within Orange County. The LOSSAN Corridor is owned by OCTA, with Metrolink commuter rail service maintained and operated by the SCRRA. The Burlington Northern Santa Fe (BNSF) Railway, the Union Pacific Railroad (UPRR), and Amtrak all have been granted user rights by OCTA.
Because it is the primary north/south rail corridor, the LOSSAN Corridor is becoming increasingly burdened due to the demand of commuter rail and freight rail, operations.
OCTA recently completed construction of a project for the purpose of increasing the capacity of the corridor, the Metrolink Service Expansion Project (MSEP). The MSEP will increase capacity to accommodate OCTA’s planned expansion of commuter rail operations, targeting a 30 minute headway resulting in rail service at each station within the corridor every 30 minutes for commuter rail service within the next couple of years. In addition, due to the increase in train movements resulting from the expansion of the Ports of Los Angeles and Long Beach, freight service has also increased. Finally, increased development, and accompanying traffic has increased delay at the existing highway-rail crossing.
OCTA has embarked on an ambitious program, which began in 2009 to grade separate 13 at-grade highway-rail crossings within Orange County. The first group of those, three are EXHIBIT 2
City Council 22 – 143 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 4
currently under construction and four others are scheduled to go to construction by 2014.
This project is part of the next group of projects to advance.
The City nominated this project with the California Public Utilities Commission (PUC) for the 2014-2015 Grade Separation Priority List and received a ranking of 26.
3.2 Community Interaction
A Project Development Team (PDT) was identified to foster collaborative communications among the stakeholders which includes representatives from OCTA, Caltrans, and City.
The representatives have actively participated in the engineering and environmental studies leading up to the development of this Project Report Equivalent A public informational meeting was held on December 18, 2013, in the City of Santa Ana.
The preferred alternative and technical studies were presented to approximately 33 attendees representing the local community. Representatives from OCTA, Caltrans, City of Santa Ana, AECOM, and ICF International were present to address questions from the general public. In general, the public expressed support for the project.
3.3 Existing Facility
Santa Ana Boulevard is listed in the City’s General Plan as a 6-Lane Primary Arterial, which is defined as a roadway with 100 feet of right-of-way width and includes 3 traffic lanes for a total of 35 feet of traveled way in each direction, a 14-foot median, and 8-foot parkways.
Currently, Santa Ana Boulevard is a six-lane street with left turn pockets located in each direction at the intersections with Santiago Street and the I-5 southbound on and off ramps.
The right of way along Santa Ana Boulevard is 104 feet in width.
The railroad right-of-way is owned by OCTA and the tracks are maintained by SCRRA. In addition, Amtrack commuter trains as well as freight rail service provided by BNSF have licenses with OCTA for use of the tracks.
The land use surrounding the project site varies and includes industrial uses in the northerly quadrant; various industrial uses, including parts of the Orange County maintenance yard and a junkyard in the easterly quadrant; the Santa Ana Regional Transportation Center (SARTC) in the southerly quadrant; and, single-family dwellings in the westerly quadrant. 4 PURPOSE AND NEED
4.1 Need
Increased traffic on Santa Ana Boulevard and increased train movements on the LOSSAN line have resulted in the increase of delays at the existing highway-rail crossing of Santa Ana Boulevard and the SCRRA double-track. These delays have not only affected the traveling public, but also have impacted access by emergency vehicles. This is compounded by the fact that there is currently only one other grade separation located at 1st Street, within the city limits, increasing the importance to the City’s traffic circulation as the project will provide another unimpeded access across the railroad.
Also, safety at the crossing is a major concern. Since 1977, there have been four separate accidents at this crossing, averaging about one every eight years. These four accidents are classified as follows: one involved an Atchison Topeka Santa Fe (ATSF) train striking a vehicle stopped on the tracks; two others involved a motorist driving around the gates and being struck by an ATSF train; and one involved an AMTRAK train hitting a pedestrian walking on the tracks. Please see Section 4.3.1, Accident Analysis-Vehicle/Train, of this EXHIBIT 2
City Council 22 – 144 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 5
report, and Attachment A for copies of the Highway-Rail Crossing Accident/Incident Reports for additional details.
4.2 Purpose
The primary project objective is to minimize potential conflicts between trains, vehicles, and pedestrians. The project also aims to alleviate traffic congestion and delayb and provide better connectivity by constructing a grade separation structure with the railroad and retiring the existing at-grade crossing. The proposed project is deemed required and necessary, and is supported by various public agencies.
4.3 Deficiencies
Safety at the crossing is a major concern to OCTA and the City. Accident/Incident Reports were obtained from the CPUC website. These reports, included as Attachment A, range from December 1977 to January 2000, and document four accident/incidents, described in Table 1.
Table 1 - Summary of Accident Data from the CPUC
Location Number of Accidents Primary Collision Factor Fatal Injury Non-Injury Total Santa Ana
Boulevard HighwayRail Crossing 1 0 3 4
Pedestrian 1
Stopped on Crossing 1
Drove Around/Through
Gate 2
Did Not Stop 0
Stopped and Then
Proceeded 0
Other 0
This table shows there was a fatality, as one person was killed while walking on the tracks.
4.4 Regional and System Planning
The project has been programmed in the Federal Transportation Improvement Program (FTIP) as Federal Project Number ORA082610, and in the Regional Transportation Plan (RTP) as project number 2TR0704.
4.5 Traffic
A Traffic Study was prepared and received technical approval from Caltrans on August 28, 2012. The study evaluated rail-highway grade crossing delay in the existing condition (2011), opening year (2016) and future year (2035). In addition, the study focused on locations that could be directly affected by the proposed grade separation project. Level of service (LOS) was conducted at these intersections in the existing condition (2011), opening year (2016) and future year (2035) with and without the project. Detailed methodologies and analysis results can be referenced in the traffic study.
One of the project's needs is to eliminate delays at the current at-grade crossing. Since the project eliminates the at-grade crossing, this analysis is not performed under "with project" conditions. The delays are summarized in Table 2.
EXHIBIT 2
City Council 22 – 145 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 6
Table 2 - Rail-Highway Grade Crossing Delay Analysis without Project Study Year
Train Frequency
(trains per day)
Daily Delay
(minutes/vehicle)
AM Peak Delay
(minutes/vehicle)
PM Peak Delay
(minutes/vehicle)
Existing
2011
66 0.10
8/10 (AM/PM)
trains per hour 0.28 0.32
Project
Opening
2016
71 0.13
8/10 (AM/PM)
trains per hour 0.34 0.41
Future
2035
105 0.20
8/10 (AM/PM)
trains per hour 0.43 0.48
Table 3 summarizes the intersection LOS with and without the project in the existing condition (2011), project opening (2016) and future condition (2035). Existing traffic volumes were collected at the study intersections. Opening year volume is composed of existing count data, background growth, and the traffic that is anticipated to occur based on known development projects within the vicinity of the study area. The future year condition accounts for major plans within the study area, including the Santa Ana Fixed Guideway (Streetcar), Santa Ana Regional Transportation Center (SARTC) Expansion, and Transit Zoning Code Environmental Impact Report.
As shown in Table 3, all study area intersections are forecast to operate at acceptable LOS with the project except for that of Fuller Street/Santa Ana Boulevard. It should be noted that this location experiences significant delays on the minor street approach (Fuller Street) due to the high volume on Santa Ana Boulevard that is not required to stop. Utilizing the Federal Highway Administration's (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) Signal Warrant 3 (Peak Hour Warrant), this location does not warrant a signal under existing, project opening, and future conditions. In addition, this location will operate at LOS F without the project; as such, the additional delay (less than the 1% threshold of significance) with the project would not constitute a significant impact.
At all other locations, the project will result in minimal changes to the intersection capacity utilization (ICU) values (none greater than the 0.010 ICU threshold) or the average delays (less than 1%) per vehicle. Overall, the project and associated improvements can be implemented without significantly impacting any of the study area intersections or roadway segments. The proposed project will provide a net benefit by reducing the congestion along Santa Ana Boulevard caused by daily train crossings by removing the existing at-grade conflict between vehicular traffic and rail traffic.
EXHIBIT 2
City Council 22 – 146 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 7
Table 3 - Intersection LOS
Notes:
AWSC – all-way stop controlled intersection; TWSC – two-way stop controlled intersection; Delay expressed in terms of seconds Bold denotes unacceptable LOS
1 ICU reported for all signalized locations, except Caltrans facilities. Delay (reported in seconds per vehicle) is reported for all unsignalized intersections and Caltrans facilities. For AWSC, the average delay is calculated whereas for TWSC, the delay of the worst approach is calculated.
5 ALTERNATIVES
The Project Development Team (PDT) explored various alternatives to address the need and purpose of this project, taking into account the constraints presented by the project area and the City’s desired traffic operations. Both an overhead alternative and an underpass alternative were discussed among the PDT members. However, the overcrossing alternative was deemed nonviable because of concerns and opposition expressed by members of an adjacent neighborhood.
A No-Build Alternative was not considered, with the exception of within the traffic studies Year
Intersection Traffic
Control
Without Project With Project
AM Peak
Hour
PM Peak
Hour
AM Peak
Hour
PM Peak
PM Peak
Hour
PM Peak ICU LOS ICU LOS ICU LOS ICU LOS
Existing (2011)
Santiago St/Santa Ana Blvd Signal 0.479 A 0.538 A 0.532 A 0.588 A Delay LOS Delay LOS Delay LOS Delay LOS
Grand Ave/Santa Ana Blvd Signal 28.1 C 25.7 C 28.1 C 25.7 C Santiago St/Civic Center Dr AWSC 11.4 B 12.3 B 11.6 B 12.4 B Logan St/Santa Ana Blvd TWSC 11.2 B 9.7 B n/a2 n/a2
SARTC Dwy/Santa Ana Blvd TWSC 9.7 A 11.8 B 9.7 A 11.8 B Fuller St/Santa Ana Blvd TWSC >50 F >50 F >50 F >50 F
I-5 SB Ramps/Santa Ana Blvd Signal 25.5 C 26.4 C 25.6 C 26.4 C Opening Year (2016)
ICU LOS ICU LOS ICU LOS ICU LOS
Santiago St/Santa Ana Blvd Signal 0.521 A 0.598 A 0.587 A 0.662 B Delay LOS Delay LOS Delay LOS Delay LOS
Grand Ave/Santa Ana Blvd Signal 28.8 C 26.4 C 29.4 C 26.7 C Santiago St/Civic Center Dr AWSC 12.3 B 13.3 B 12.8 B 13.9 B Logan St/Santa Ana Blvd TWSC 11.6 B 9.8 A n/a2n/a2 n/a2n/a2 SARTC Dwy/Santa Ana Blvd TWSC 9.9 A 12.5 B 10.0 A 12.7 B Fuller St/Santa Ana Blvd TWSC >50 F >50 F >50 F >50 F
I-5 SB Ramps/Santa Ana Blvd Signal 26.0 C 26.6 C 26.3 C 26.8 C Future Year (2035)
ICU LOS ICU LOS ICU LOS ICU LOS
Santiago St/Santa Ana Blvd Signal 0.771 C 0.774 C 0.771 C 0.773 C Santiago St/Civic Center Dr Signal 0.559 A 0.610 B 0.565 A 0.619 B Delay LOS Delay LOS Delay LOS Delay LOS
Grand Ave/Santa Ana Blvd Signal 32.1 C 37.8 D 32.1 C 37.8 D Logan St/Santa Ana Blvd TWSC 12.9 B 10.7 B n/a2n/a2 n/a2n/a2 SARTC Dwy/Santa Ana Blvd TWSC 9.7 A 14.7 B 9.7 A 14.7 B Fuller St/Santa Ana Blvd TWSC >50 F >50 F >50 F >50 F
I-5 SB Ramps/Santa Ana Blvd Signal 31.7 C 30.7 C 31.8 C 30.7 C EXHIBIT 2
City Council 22 – 147 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 8
discussed later in this report, as it does not meet the project objective. With this, the PDT members elected to study the underpass alternative as the single-build alternative and it was selected as the locally recommended alternative. Refer to Attachment B for the proposed layout, typical section and profile of the locally recommended alternative.
5.1 Alternative Description
5.1.1 Design Parameters
The governing standards for the horizontal and vertical roadway alignment alignments are Caltrans and American Association of State Highway and Transportation Officials (AASHTO) standards and practices. Caltrans Highway Design Manual (HDM) was used to determine the minimum inside radius for the horizontal curves and AASHTO's Policy on Geometric Design of Highways and Streets was used for to determine minimum curve length for crest and sag vertical curves.
Selected specific design parameters include the following:
x Design Speed: 45 mph
x Vertical Clearance: 16'-6"
x Cross-Section: 100' right-of-way width (minimum)
5.1.2 Horizontal Layout
The horizontal alignment of this alternative is based on the standards listed above. The alignment features a slight shift of the roadway centerline to the south to accommodate a utility corridor and a landscaped-retaining-slope area along the northerly right-of-way. The utility corridor will allow the relocation of the water and sewer line and preserves an existing underground electric transmission line. The landscaped-retaining-slope area would reduce the impact of the proposed retaining wall and provide an additional buffer adjacent to the residential properties. Shifting the alignment southward also eliminates the need to acquire right-of-way from residential properties to the north, given there is space available to the south at the City owned SARTC parking area.
5.1.3 Profile
This alternative will depress the roadway profile to allow for an underpass bridge that carries the railroad tracks over Santa Ana Boulevard. The proposed profile will join the existing grade at the Santiago Street intersection to the west and the I-5 southbound off-ramp to the east. The new Santa Ana Boulevard profile is designed to provide a minimum of 16.5 feet clearance to the soffit of the underpass structure utilizing 6% grades for the approaches.
5.1.4 Cross-Section
Santa Ana Boulevard is designed as a six-lane primary arterial with three traffic lanes and a total of 35 feet of traveled way in each direction, plus a 15-foot median. The northerly parkway will be widened to accommodate the utility corridor and the landscape-retainingslope area. The southerly parkway will remain at the standard width of eight feet.
Landscaping will not be proposed within the southerly parkway. However, a 50-foot landscaped embankment will be incorporated to the south to eliminate the need for a retaining structure against the SARTC. The 50-foot buffer will also accommodate future developments including a street car corridor and the SARTC Master Plan.
5.1.5 Adjacent Streets
Access from Logan Street to Santa Ana Boulevard will be terminated with a cul-de-sac on Logan Street. The intersection of Fuller Street and Santa Ana Boulevard will be reconfigured EXHIBIT 2
City Council 22 – 148 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 9
on the south side of Santa Ana Boulevard into a T-intersection that will allow full access to Santa Ana Boulevard from the south. The north leg will be terminated with a cul-de-sac and connectivity with Santa Ana Boulevard will be reestablished with a new access road. Due to the proximity to the southern leg of Fuller Street, access will be limited to right-in/right-out.
5.2 Structure
The proposed underpass structure will match the current horizontal and vertical alignment of the two existing Metrolink tracks and span Santa Ana Boulevard which will be depressed under the tracks at this location. In addition, the underpass structure is also designed to meet the needs of the City's SARTC Master Plan, which entails new station areas, additional parking, and improved pedestrian and bicycle access as well as a future street car corridor, resulting in a four-span, simply-supported structure. The proposed underpass superstructure is a steel girder bridge since this is the SCRRA preferred bridge type for span length between 15 feet to 72 feet. Refer to Attachment C for the Bridge General Plans.
5.3 Pedestrian Bridge
Two pedestrian bridges are proposed to flank both sides of the proposed railroad underpass structure. The proposed pedestrian bridges will provide connectivity between the residential neighborhood west of the railroad and potential mix-use developments east of the railroad bridge at the SARTC. The exact bridge type and configuration will be determined during the next phase of the project. Refer to Attachment D for a typical section of the proposed pedestrian bridge.
5.4 Stage Construction
Stage construction is a critical component of this project as it affects right-of-way acquisition and access to the local businesses and properties. A detailed analysis and design for staging should be completed during the next phase of the project. However, several critical components have been identified and incorporated into the overall design during this phase.
The following is a summary of construction staging. Attachment E contains plans of the concept.
The first phase of construction involves constructing the shoofly and shifting Santa Ana Boulevard south of its current alignment onto a detour road. The shoofly is needed to maintain railroad operations. The shoofly is designed to maintain existing design speeds. A copy of the shoofly layout is included in Attachment F. The detour road will provide two travel lanes in each direction for the duration of the stage for approximately 12 months.
Reducing the number of travel lanes will still allow Santa Ana Boulevard to operate at LOS A.
The second phase of the construction will require complete closure of the eastbound direction on Santa Ana Boulevard, detouring eastbound traffic to Fruit utilizing the detour road. Westbound traffic will be maintained on the newly constructed roadway.
The staging concept allows the railroad to remain fully operational during construction, although minor closures will be needed to allow switching over to the shoofly. The placement of the shoofly will allow the continued use of the easterly platforms at SARTC, greatly reducing the need for temporary platforms. It is noted that on June 3, 2014, Amtrak representatives agreed to a temporary platform length of 800 feet.
5.5 Right of Way
Right-of-way needs are driven by the staging concept. Additional right-of-way is needed to construct a temporary detour road south of existing Santa Ana Boulevard and temporary EXHIBIT 2
City Council 22 – 149 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 10
shoofly tracks east of existing railroad tracks. Nine parcels will require full acquisition, three parcels will require partial acquisition, and ten parcels will require temporary construction easements. Due the preliminary nature of this study, individual property owners were not consulted to determine the extent of the impacts to their properties. Full acquisition of a parcel is assumed where the proposed shoofly or detour road will impact an existing building, otherwise, temporary construction easements are assumed. Refer to Attachment G for a breakdown of the right-of-way requirements.
5.6 Drainage
The drainage designs for the preferred alternative of the project follows the current Orange County Hydrology Manual (1986) and City of Santa Ana engineering design standards.
Generally, 100-year and 25-year storm water discharges will be studied for sump conditions and gravity/flow-by conditions respectively.
The project site currently receives surface flows generally from northeast to southwest by means of street flow. There is an existing storm drain system consisting of a 24-inch reinforced concrete pipe (RCP) and catch basins at Santa Ana Boulevard near the existing railroad at-grade crossing that receives surface flow from the project site and offsite flows from north of Santa Ana Boulevard. The project site runoff then drains to Santa Ana Delhi Channel and eventually discharges to Upper Newport Bay and Lower Newport Bay.
In the proposed condition, a pump station and new catch basins are proposed to collect runoff in the newly created sump along Santa Ana Boulevard. The outflow from the pump station will be discharged to the existing 24-inch drainage system along Santa Ana Boulevard west of the project limit. A portion of the existing 24-inch RCP conflicting with the proposed improvements will be removed and a drainage system will be reestablished between the existing drainage system and the pump station. It is noted that the exact location and configuration of the pump station will be determined in the next phase of the project as details of the SARTC Master Plan and Street Car Corridor become available.
Tentatively, the pump station is located next to the Fuller Street cul-de-sac since this is the area least impact by future SARTC expansion.
The drainage pattern at Santiago Street near the project is not anticipated to be changed; however, additional catch basins should be considered at the northeast corner of the Santa Ana Boulevard / Santiago Street intersection to reduce surface flow traveling toward the proposed sump. The street flow along Logan Street and Lincoln Avenue north of Santa Ana Boulevard will be captured by an at grade swale before the underpass.
5.7 Utilities
Refer to Attachment H for exhibits showing existing and proposed utilities. There are numerous existing utilities within the project footprint. Based on field investigation, as-built plan research, and coordination with various utilities owners, the existing utilities are summarized below.
City of Santa Ana:
12” waterlines: A 12” waterline runs east-west along the Santa Ana Boulevard. It ties into a 16” waterline to near the intersection of the Santa Ana Boulevard and Santiago Street and tees into a 20” waterline running north-south direction along the Fuller Street to the east. A 20" waterline continues to the east under Santa Ana Boulevard until it connects to the 16" waterline along Grand Avenue.
EXHIBIT 2
City Council 22 – 150 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 11
8” water lines: Two 8” waterlines are identified within the proposed project area. Both are fed from the 12" waterline along the Santa Ana Boulevard. The first waterline flows northerly along Logan Street north of the Santa Ana Boulevard, the second one runs southerly along Fuller Street from the 20" waterline in Santa Ana Boulevard until it ties into the 8" waterline on Fruit Street.
6” waterline: A 6” waterlines have been identified in the north-south direction just west of the railroad. The waterline is also connected to the waterline underneath Santa Ana Boulevard. The waterline continues to the north underneath Lincoln Avenue. 20” waterline: A 20” waterline is located under Fuller Street that extends north from Santa Ana Boulevard.
Sewer: City of Santa Ana sewers are generally running in the north-south direction and are connected to the Orange County Sanitation District (OCSD) sewer main underneath Fruit Street. They are summarized as follows:
Santiago Street 8"
Logan Street 6"
Lincoln Avenue/Railroad 6"
Fuller Street 6"/8"
Orange County Sanitation District (OCSD):
18" sewer trunk main: The 18" sewer runs in the east-west direction underneath Fruit Street. The sewer line continues to the east passing under the SARTC parking area and under Santa Ana Boulevard east of Santiago Street.
Southern California Gas (SCG):
With the exception of a short segment between Santiago Street and Logan Street, all SCG gas lines are limited to side streets. The locations of existing gas lines are summarized as follows:
Santa Ana Boulevard 4" (between Santiago Street and Logan Street) Logan Street 2"
Lincoln Avenue/Railroad 2"
Fuller Street 2" (north of Santa Ana Boulevard)
Fruit Street 3"
Southern California Edison (SCE):
Underground cables: Underground cables are identified along the south side of Santa Ana Boulevard, west side of Lincoln Avenue, and west side of Fuller Street within the project area. Some underground SCE facilities can also be found on the north side of the Santa Ana Boulevard between Santiago Street and Fuller Street.
Aerial Facilities: Power poles and aerial wires are found along the east side of Fuller and north side of Santa Ana Boulevard.
EXHIBIT 2
City Council 22 – 151 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 12
AT&T
AT&T’s facilities are located along Santiago Street, Logan Street, Fuller Street, and Fruit Street. A short segment is also located under the SARTC parking area south of Santa Ana Boulevard.
Verizon
Verizon overhead lines are located along Lincoln Avenue, Fuller Street and Fruit Street.
Metrolink
Metrolink’s telecommunication and signal control cables are located within the railroad right of way and along the railroad tracks.
Impacts to existing utilities are mainly as a result of depressing Santa Ana Boulevard roadway profile limiting the ability of utilities along side streets to continue across Santa Ana Boulevard. To that end, the following strategies are proposed:
City of Santa Ana:
Water: The 12” waterline under Santa Ana Boulevard will be relocated to a proposed parallel utility corridor north of Sana Ana Boulevard. This will allow the waterline to maintain existing ground profile as the utility corridor will not be depressed. Minor waterlines along the side streets to the north will also be able to retain their connectivity to the 12" waterline. East of Fuller Street, the 20" waterline will be relocated behind the northerly retaining wall. Additional study is needed to determine if the 8" waterline under Fuller Street south of Santa Ana Boulevard can be removed.
Sewer: Although the existing OCSD trunk main can remain in place underneath the SARTC parking area, connectivity to sewer service lines from Logan Street, Lincoln Avenue, and Fuller Street will be disrupted by the depressed Santa Ana Boulevard roadway profile. As a result, a 12" sewer is proposed to be placed in the same utility corridor to collect service lines from the north and reconnect to the OCSD trunk line near Santiago Street. It is noted that since the proposed 12" line will be at a higher elevation at Lincoln Avenue/Railroad crossing, the existing sewer service line along Lincoln Avenue/Railroad will need to be reconstructed at a higher elevation as well.
Dry Utilities (Eletric, Telephone, and Gas):
Due to a general lack of dry utilities located within Santa Ana Boulevard, existing dry utilities can be generally protected in place. It is noted that the utility corridor will allow for the protection of existing SCE underground line paralleling Santa Ana Boulevard.
Additional coordination efforts are need in the next phase of the project.
5.8 Cost Estimate
A detailed cost breakdown for the preferred alternative is included as Attachment I. The following table summarizes the cost for the construction and support components.
EXHIBIT 2
City Council 22 – 152 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 13
Table 4 - Cost Breakdown
Construction Cost $45.0M
Roadway $32.9M
Structures $12.1M
Right-of-Way $15.6M
Total Project Capital Outlay $60.6M
Support (PS&E, Right-of-Way, Construction,
Program Management)
$12.7M
Total Project Cost $73.3M
6 ENVIRONMENTAL DETERMINATION
Caltrans is the National Environmental Policy Act (NEPA) Lead Agency for this project. Initially, Caltrans determined that the appropriate environmental documentation for NEPA compliance is an Environmental Assessment (EA). Refer to Attachment J for the Preliminary Environment Study (PES). However, upon the completion of the required technical studies and public meeting, it was determined that the project is Categorically Excluded (CE). The Categorical Exemption / Categorical Exclusion Determination Form is included as Attachment K. The project is also Statutorily Exempt (SE) from the California Environmental Quality Act (CEQA) per Section 15282(g). City has filed the Notice of Exemption (NOE) as the lead agency on June 23, 2014.
The PES recommended the following technical studies to support these documents: Traffic Study; Noise Study Report; Air Quality Assessment Report; Initial Site Assessment; Water Quality Memorandum; Natural Environmental Study-Minimum Impact; Visual Impact Assessment; Relocation Impact Memorandum; Historical Property Survey Report; Archaeological Survey Report, Historic Resources Evaluation Report, and Community Impact Assessment. The Environmental Commitment Record listing various mitigation measures is included as Attachment L. The result of the Traffic Study is included in Section 4.5 and the results of the remaining studies are included as follows:
6.1 Noise Study Report (NSR):
The NSR determined that six of the 16 modeled receivers (representative of six residences or noise-sensitive receptors) would approach or exceed the FHWA/Caltrans noise abatement criteria (NAC) for Activity Category B and C land uses with the implementation of the project. Noise abatement in the form of soundwalls was considered. Two soundwalls were found to be acoustically feasible and the estimated cost to construct was compared with the reasonable allowance. NB-2 was determined to be reasonable to construct at heights of 12 to 16 feet.
During construction of the proposed project, noise from construction activities would intermittently dominate the noise environment in the immediate area of construction.
Conventional construction equipment is expected to generate maximum noise levels ranging from 75 to 99 decibels (dB) at a distance of 50 feet, while noise from pile driving, if necessary, would generate maximum noise levels of approximately 101 dB at a distance of 50 feet. Noise produced by construction equipment would diminish over distance at a rate of about 6 dB per doubling of distance. No adverse noise impacts from construction are anticipated because construction would be conducted in accordance with the Department’s EXHIBIT 2
City Council 22 – 153 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 14
provisions in Section 14-8.02, “Noise Control” of the Draft 2010 Standard Specifications and Special Provisions (SSP S5-310), and applicable local noise standards.
The closest residences to the project site are within 50 feet from the project construction areas. Therefore, these residences may be subject to short-term noise reaching 95 dBA maximum sound level (L max) or higher generated by project construction activities.
Proposed avoidance and/or minimization measures include:
N-1 Comply with the construction hours specified in the City of Santa Ana Municipal Code, Noise Section 18-314.
N-2 Noise control will conform to the provisions in Section 14-8.02 and Standard Special Provision S5-310. The noise level from the contractor’s operations between the hours of 9:00 p.m. and 6:00 a.m. will not exceed 86 dBA L eq (h) at a distance of 50 feet.
This requirement in no way relieves the contractor from responsibility for complying with local ordinances regulating noise levels. The contractor should use an alternative warning method instead of a sound signal unless required by safety laws. In addition, the contractor will equip all internal combustion engines with the manufacturer-recommended mufflers and will not operate any internal combustion engine on the job site without the appropriate muffler.
N-3 The sound barriers that are determined to be reasonable and feasible shall be coordinated with the affected property owners. All benefited residents and property owners will be notified should a change in placement or removal of any soundwall occur during the design phase. Additionally, all residents/property owners will be notified of final soundwall locations prior to 100% PS&E.
N-4 The contractor will implement appropriate additional noise mitigation measures, including changing the location of stationary construction equipment, turning off idling equipment, rescheduling construction activity, notifying adjacent residents in advance of construction work, and installing acoustic barriers around stationary construction noise sources.
6.2 Air Quality Assessment Report:
The Air Quality Assessment Report determined that the project would have no adverse impacts under National Environmental Policy Act (NEPA). The determination is based on the following:
x during project construction, the implementation of exhaust and fugitive dust emission control measures would avoid and/or minimize impacts to air quality; x the project is included in the Southern California Association of Government’s (SCAG) 2008 Regional Transportation Plan (RTP) and SCAG 2011 Federal Transportation Improvement Program (FTIP) (Project ID ORA082610), which implies that project’s operational emissions (which include the ozone precursors reactive organic gases (ROG) and oxides of nitrogen (NOX) meet the transportation conformity requirements imposed by EPA and the South Coast Air Quality Management District (SCAQMD). As such, the project would not exceed the motor vehicle emissions budget for the region;
EXHIBIT 2
City Council 22 – 154 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 15
x Caltrans’ Carbon Monoxide (CO) protocol screening procedure demonstrated that the project would not have a material effect on localized CO concentrations; x the proposed project is not considered a project of air quality concern, as defined by 40 CFR 93.123(b)(1), and as such, a qualitative PM2.5/PM10 (particulate matter 2.5 and 10 microns or less in diameter) hot-spot evaluation is not required. It is unlikely that the proposed project would generate new air quality violations, worsen existing violations, or delay attainment of National Ambient Air Quality Standards (NAAQS) for PM2.5 or PM10; and
x the proposed project was found to have no potential for significant mobile-source air toxics (MSAT) emissions (using FHWA guidance) and is not linked with any special MSAT concern.
Proposed avoidance and/or minimization measures include:
AQ-1 The project would conform to Caltrans’ construction requirements, as specified in the Caltrans’ Standard Specifications, Section 7-1.01F (Air Pollution Control): “The Contractor shall comply with all air pollution control ordinances and statutes which apply to any work performed pursuant to the contract, including any air pollution control rules, regulations, ordinances and statutes, specified in Section 11017 of the Government Code.” AQ-2 The proposed project, although not a large operation under the Rule’s definition would be required to implement measures for each source of PM10 emissions, as specified in SCAQMD Rule 403 (Fugitive Dust) Implementation Handbook.
6.3 Initial Site Assessment (ISA):
Table 5 lists identified or potential environmental concerns based on site reconnaissance and review of historical information sources regarding the acquisition and temporary construction easement parcels (BOLD = Recognized Environmental Condition):
Follow up Phase I Environmental Site Assessments were conducted on the area along Fuller Street north of Fruit Street, the County maintenance facility and the industrial buildings at the south end of the acquisition area, south of Sixth Street. Additional Phase II Environmental Site Assessment was also performed on 1111 and 1143 Fruit Street (A-9).
The result of the Phase II Site Assessment did not indicate significant soil impacts that would require remediation. However, access to the remaining properties has limited further analysis. As a result, the following recommendations were made to be completed at a later date:
HAZ-1 A Phase II Environmental Site Assessment is recommended during the final design phase for parts of the study area as follows: parcel A-1 (1024 Fuller): currently the auto repair shop: sampling if indicated (interior inspection required); parcel A-2 (1022 Fuller):
former machine shop with degreaser, auto wrecking and auto repair shop; parcel A-4 (1020 Fuller): former paint manufacturer, former auto body shop, former metals recovery facility; parcel A-5 (1016 Fuller): former machine shop; parcel A-6 (1012 Fuller): former paint spray booth, former paint manufacturer (Jasco Chemical); parcel A-7 (1008 Fuller): Jasco Chemical. The Phase II ESA would include soil sampling for petroleum hydrocarbons, volatile organic compounds, heavy metals and/or those chemicals formerly stored on site by Jasco Chemical, as appropriate for each individual location.
EXHIBIT 2
City Council 22 – 155 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 16
HAZ-2 Perform a comprehensive survey for asbestos-containing materials, lead-based paint, PCBs and mercury switches during the final design phase at the buildings proposed for acquisition.
HAZ-3 Subsurface investigations are deemed to be unnecessary on Temporary Construction Easement parcels. However, in view of the former usage of Parcel T-9 for battery manufacturing, and the current presence of an automotive junkyard on the site, soil sampling for lead, cadmium and petroleum hydrocarbons should performed if any ground disturbance is contemplated in order to ensure worker and public safety during construction.
HAZ-4 The hazardous waste storage area and possible waste oil tank at J&H Drilling should be inspected for possible releases of waste oil or other environmental concerns.
HAZ-5 Removal of the three closed-in-place USTs at the former Jasco Chemical plant should be considered.
HAZ-6 Inspection and sampling for asbestos, lead-based paint, PCBs and mercury switches in the building in the acquisition area.
Table 5 - Environmental Concerns
Area Parcel Numbers Current Concerns Historical Concerns Fuller Street A-1 through A-8
(and T-1)
Industrial buildings Chemical plant with
removed and closedin-place USTs (closed
LUST case 2000)
County yard A-9 Repair/service facilities Former petroleum storage facility
South Warehouses A-11 Possible hazardous materials
usage
Former warehouses,
light-industrial buildings
and auto repair shops
East of Fuller Street T-4 Known low-level soil impacts
by heavy metals
Agriculture
County Yard T-8 Gas station, known low-level
impacts by PCE and TCEy to
soil vapor, repair/service
facilities
--
Auto Wrecking Yard T-9 Auto wrecking yard Battery manufacturer
6.4 Water Quality Memorandum
The following avoidance and minimization measures were included in the Water Quality Memorandum:
WQ-1 The project shall comply with the provisions of the National Pollutant Discharge Elimination System (NPDES) General Permit, Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activities (Order Number 2009-0009-DWQ, NPDES Number CAS000002) and any subsequent permit in effect at the time of construction.
Prior to construction, Permit Registration Documents (PRDs), which includes permit application fee, a Notice of Intent (NOI), a Storm Water Pollution Prevention Plan (SWPPP) EXHIBIT 2
City Council 22 – 156 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 17
and other compliance related documents required by the permit, shall be mailed to the State Water Quality Control Board.
The project SWPPP shall be prepared by a Qualified SWPPP Practitioner (QSP) or a Qualified SWPPP Developers (QSD) to address all construction related activities, equipment, and materials that have the potential to impact the water quality. The SWPPP shall identify the sources of pollutants that may affect the quality of storm water and include construction site BMPs to control pollutants and sediments. The SWPPP shall include erosion control, sediment control, wind erosion control, tracking control, and all other applicable non-stormwater management and material management BMPs. All construction site BMPs shall follow the latest edition of the CASQA Stormwater Best Management Practice Handbook for Construction. In addition, the project water quality risk level shall be identified. Rain Event Action Plan, Field Monitoring, and Reporting Guidance shall be prepared for effluent monitoring and receiving water monitoring.
The General Permit requires that permittees prepare, certify, and electronically submit an Annual Report no later than September 1st of each year. Reporting requirements are identified in Section XVI of the General Permit.
WQ-2 Treatment BMPs shall be implemented to the maximum extent practicable (MEP), consistent with the requirements of the Orange County MS4 Permit, Order R8-2009-0030 (amended by Order R8-2010-0062, NPDES No. CAS 618030). Biofiltration systems or catch basin filter inserts are proposed as the potential treatment BMPs for the project. Detailed design of the BMP and the location will be determined in the final engineering phase.
Removal of existing vegetation will be minimized to the greatest extent possible and any mature trees to be saved would be identified on final plans. The final siting and design of treatment BMPs will be designed in compliance with the 2010 OC Model Water Quality Management Plan (WQMP), the Technical Guidance Document (TGD) and the 2003 OC Drainage Area Management Plan (DAMP).
WQ-3 Design pollution prevention BMPs shall be implemented in accordance with Green Streets Municipal Handbook (EPA-833-F-08-009; 2008), such as preservation of existing vegetation, slope/surface protection systems (permanent soil stabilization), concentrated flow conveyance systems such as ditches, berms, dikes, and swales, overside drains, flared end sections, and outlet protection/velocity dissipation devices.
6.5 Natural Environmental Study-Minimum Impact (NES/MI) The NES-Minimal Impacts (NES/MI) found no natural vegetation communities occurring within the Biological Study Area (BSA). In addition, no impact to jurisdictional waters and wetlands would occur as these resources are not present within the BSA.
The following measures are avoidance and/or minimization measures to reduce impacts to species.
BIO-1 Preconstruction Nesting Bird Survey. If project-related site disturbances are scheduled to occur during the core nesting period (February 15 through September 1), a qualified biologist will perform preconstruction nesting bird surveys. The survey will be completed within seven days prior to any project-related disturbances. If native birds are nesting on or within 100 feet (as accessible) of the LOD, a 100-foot buffer (or an alternative width, as determined by a qualified ornithologist) should be flagged around the nest, and no EXHIBIT 2
City Council 22 – 157 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 18
project-related construction activities within the buffer will occur until it has been determined that all young have fledged or the nest is no longer active.
BIO-2 Preconstruction Nesting Raptor Survey. If project-related site disturbances are scheduled to occur during the core nesting period (February 15 through September 1), a qualified biologist will perform preconstruction nesting raptor surveys. The survey will be completed within seven days prior to any project-related disturbances. If raptors are nesting on or within 500 feet (as accessible) of the limits of disturbance (LOD), a 500-foot buffer (or an alternative width, as determined by a qualified ornithologist) should be flagged around the nest, and no project-related construction activities within the buffer will occur until it has been determined that all young have fledged or the nest is no longer active.
BIO-3 Preconstruction Bat Survey. To prevent impacts on daytime bat roosts and maternity roosts, a qualified biologist will be retained to conduct bat and bat roosting site surveys prior to commencement of building demolition or mature tree removal activities. This pre-construction survey will be conducted at any abandoned buildings, as well as any mature tree proposed for removal and within 100 feet of the LOD. If no roosting sites or bats are found, a report confirming their absence will be sent to the California Department of Fish and Wildlife (CDFW) and no further mitigation will be required.
If the pre-construction survey finds bats to be roosting, and building demolition/mature tree removal is scheduled to occur between October 1 and March 30 (outside of the maternity season of April 1st through September 30), the bats shall be evicted by the following methods. Eviction of bats shall be conducted using bat exclusion techniques, developed by Bat Conservation International (BCI) and in consultation with CDFW. These techniques allow the bats to exit the roosting site but prevent re-entry to the site. This process will include, but not be limited to, the installation of one-way exclusion devices on buildings and a two-step cutting process for trees. Sealing buildings at the time of abandonment may prevent the need for the exclusion process. Where exclusionary devices would be installed on buildings, the devices shall remain in place for seven days, and then the exclusion points and any other potential entrances shall be sealed. A visual inspection of each building would be required prior to demolition to verify that all bats have been successfully excluded.
Where the two-step cutting process would be applicable for tree roosts, surrounding branches, not housing bats, would be removed during step one. This would alter the condition of the roost tree, causing bats to abandon the roost. The tree can then be fully removed, as step two. A visual inspection of the roost tree would be required prior to removal to verify that all bats have been successfully excluded. This work shall be completed by a bat exclusion professional.
If the pre-construction survey finds bats to be roosting and building demolition/mature tree removal is scheduled to occur during the maternity season (April 1 through September 30), a qualified biologist will monitor the roost to determine if the roost site is a maternal roost.
This may be determined by either visual inspection of the roost for bat pups, if possible, or monitoring the roost after the adults leave for the night to listen for bat pups. If the roost is determined to not be a maternal roost, then the bats shall be evicted as described above. If the roost is determined to be a maternal roost, eviction of a maternal roost cannot occur during the nursery season, as bat pups cannot leave the roost until they have reached maturity. In this case, a 250-foot-wide buffer zone (or an alternative width, as determined in consultation with CDFW) shall be established around the roosting site, within which no construction-related impacts shall occur until the bat pups are mature enough to permanently leave the roost.
EXHIBIT 2
City Council 22 – 158 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 19
BIO-4 Standard Best Management Practices. Applicable Best Management Practices shall be implemented. These include but are not limited to:
x Water pollution and erosion control plans shall be developed and implemented in accordance with Regional Water Quality Control Board (RWQCB) requirements. x Equipment storage, fueling, and staging areas shall be located at sites with minimal risks of direct drainage into surface waters. Project related spills of hazardous materials shall be reported to appropriate entities, including but not limited to the City and/or RWQCB, and shall be cleaned up immediately and contaminated soils removed to approved disposal areas.
x Exotic species removed during construction will be properly handled to prevent sprouting or regrowth.
x Trucks with loads carrying vegetation will be covered, and vegetation materials removed from the site will be disposed of in accordance with applicable laws and regulations.
x Construction equipment will be cleaned of mud or other debris that may contain invasive plants and/or seeds and inspected to reduce the potential of spreading noxious weeds before mobilizing to the site and before leaving the site during the course of construction.
x To avoid attracting wildlife to the project site, the construction shall be kept as clean of debris as possible. All food related trash items shall be enclosed in sealed containers and regularly removed from the site(s).
6.6 Visual Impact Assessment
The report concluded that the proposed project will not result in substantial adverse effects on visual resources under the NEPA.
Since the project’s grade separation features are essentially at or below existing grade levels, they will not substantially affect either east or west-facing views along Santa Ana Boulevard. As motorist or pedestrians enter the underpass while travelling eastward on Santa Ana Boulevard, they will experience only the briefest interruptions in views of the Lomas Ridge and the more distant Santa Ana Mountains ridgelines. Hence, no significant changes to key views will occur. Residential viewers also will continue to have key eastfacing views of the mountain ridgelines available to them. The loss of mature trees will reduce visual quality over a period of five or more years; however, because comparable replacement landscaping will be installed per City and Caltrans’ best management practice, no adverse effects would occur under NEPA..
Caltrans and FHWA mandate that a qualitative aesthetic approach be taken to mitigate for visual quality loss in the project area. The proposed project fulfills these requirements because it is expected that it will address the actual loss of visual quality that will occur in the project viewshed within five to ten years of when the project is implemented by installing comparable replacement trees for those proposed for removal, where feasible, and groundcover where full right-of-way takes would necessitate demolition and/or where rightof-way design constraints will preclude installation of replacement trees. The project will be implemented in adherence to the guidance found in Caltrans’ Highway Design Manual and other Caltrans memoranda regarding landscape design policy, which mandates consideration of the local design context in which the work is proposed and obtaining the input of local governmental agencies. In addition, the project will be designed and EXHIBIT 2
City Council 22 – 159 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 20
implemented with the concurrence of the District Landscape Architect. In summary, substantial adverse effects under NEPA are not anticipated.
The following avoidance and minimization measures shall be implemented:
VIS-1 The project will be implemented in adherence to the guidance found in Caltrans' Highway Design Manual and other Caltrans memoranda regarding landscape design policy, which mandates consideration of the local design context in which the work is proposed and obtaining the input of local governmental agencies. In addition, the project will be designed and implemented with the concurrence of the District Landscape Architect.
6.7 Relocation Impact Memo
The project would affect 16 distinct nonresidential properties. Of these, seven nonresidential properties (composed of nine parcels) would be fully acquired and would result in displacement requiring relocation. An additional two nonresidential properties would be partially acquired (sliver takes) and would require some property reconfiguration but would not result in displacement. Nine properties, including portions of two of the partially acquired properties mentioned previously, would require a temporary construction easement. Based on real estate listings and the professional opinions of two local commercial real estate agents, there appear to be a sufficient supply of adequate sites to relocate all of the displacees within the immediate vicinity of the City of Santa Ana. Given the availability of suitable properties in the immediate vicinity of the project, displacement and relocation of businesses would not result in substantial hardship. Relocation assistance benefits or entitlements would be provided to displacees in accordance with the Uniform Relocation Assistance and Real Property Act of 1970, as amended.
Any person (individual, family, corporation, partnership, or association) who moves from real property or moves personal property from real property as a result of the acquisition of the real property, or required to relocate as a result of a written notice from the City of Santa Ana from the real property required for a transportation project is eligible for “Relocation Assistance.” All activities will be conducted in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended. Relocation resources shall be available to all displacees, in compliance with Title VI, free of discrimination.
6.8 Historical Properties Survey Report (HPSR)
The HSPR determined a finding of No Historic Properties Affected. Concurrence on this determination was received from the State Historic Prservation Officer on February 2, 2012.
6.9 Archaeological Survey Report (ASR)
No archaeological resources have been previously recorded within the project area of potential effect (APE), and no new cultural resources were observed within the project APE for the proposed project during the field survey. Given the geologic setting and the level of previous disturbance within the project APE, the potential to encounter buried prehistoric resources or historic-period archaeological resources within the project APE is considered to be low.
The following avoidance and minimization measure which is standard on all Caltrans’ project will be implemented:
CR-1 It is the Department’s policy to avoid cultural resources whenever possible. Further investigations may be needed if unanticipated cultural sites are encountered that cannot be EXHIBIT 2
City Council 22 – 160 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 21
avoided by the project. If cultural materials are discovered during construction, all earthmoving activity within and around the immediate discovery area will be diverted until a qualified archaeologist can assess the nature and significance of the find. If changes are made to the proposed project, an additional archaeological survey would be required to include areas not previously surveyed.
6.10 Historic Resources Evaluation Report (HRER)
Thirty-four built environment properties were evaluated in the HRER. The Burlington Northern Santa Fe Railroad was determined ineligible for the National Register and the California Register in 2007, as was 1102 East Fruit Street in 2004. 917 Logan Street was surveyed in 1980 and was determined to be a 5D2. Due to a lack of supporting documentation of that finding and because it was assessed more than 20 years ago, it has been re-evaluated and determined individually ineligible for the National Register and California Register. The Orange County Maintenance Yard was previously determined eligible for the National Register by State Historic Preservation Officier (SHPO) on December 27, 2004. A re-assessment of the determination and supporting documentation for 1102 East Fruit Street concluded that the finding in 2004 was in error and the Orange County Road Department Maintenance Yard is ineligible for the National Register and the California Register. All of the evaluated properties have been found to be ineligible for the National Register and the California Register and are not considered historical resources for the purposes of CEQA. All other properties within the APE meet the criteria for Section 106 PA Attachment 4 (Properties Exempt from Evaluation). No impacts were identified and no avoidance, minimization and/or mitigation measures were needed.
6.11 Community Impact Assessment (CIA)
The Community Impact Assessment considers how the proposed project would affect the people, neighborhoods, communities, businesses, and larger social and economic systems.
The findings of the CIA concludes that the proposed project would not introduce an incompatible use in the area, the pattern and rate of population and housing growth would be consistent with those contemplated in existing regional and local plans for the area, and the proposed project would have beneficial effect on community. Cumulative impacts are not expected to be cumulatively considerable.
The following avoidance and minimization measures shall be implemented:
TRF-1 Prepare and implement a Traffic Management Plan (TMP). The TMP will be provided to emergency service providers and school officials with construction plans prior to commencement of construction. The following shall be included in the TMP or carried out in coordination with the TMP:
x Implement a construction management program that maintains access to and from the project area community through signage, detours, flagmen, etc. x Coordinate with emergency services providers to ensure that alternative response routes to and from the project area community are in place during construction of the proposed project.
x Provide access to all fire hydrants along all access routes and provide and maintain fire department vehicle access roads along project site. x Consult with local school officials to indentify safe vehicular routes and pedestrian crossing for student traveling to and from schools in the project area community during construction of the proposed project.
x Coordinate with the utility providers for relocation of ut9ility lines and inform the utility users in advance about the date and timings of service disruptions.
EXHIBIT 2
City Council 22 – 161 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 22
x Prepare temporary detour plans during the Plans, Specifications, and Estimate (PS&E) phase.
x Provide notification to be sent to emergency service providers, local school officials, and any residents that may be substantially affected by any street closure (including partial and/or full closures) or traffic diversions at least two weeks in advance of the planned closure or diversion.
RELOC-1 In accordance with the federal Uniform Relocation Assistance and Property Acquisition Act of 1970 as amended (42 USC Secs. 4601-4655), provide compensation to eligible recipients for property acquisitions.
UT-1 The City will coordinate all utility relocation work with the affected utility companies to ensure minimum disruption to customers in the service areas during construction. 7 RAILROAD INVOLVEMENT
There are two SCRRA mainline tracks located within the project. OCTA owns the railroad right of way, while SCRRA maintains and operates the Metrolink service. SCRRA is an important stakeholder of the project. The PDT initially met with SCRRA on August 31, 2011. Additional meetings between February and August of 2014 were held to discuss structure type and shoofly alignment. In these meetings, SCRRA approved the proposed steel girder bridge in concept.
SCRRA also rejected a staging concept that would eliminate the need for a shoofly.
It was also determined that SCRRA will be responsible for all work related to shoofly installation, temporary at-grade crossing with the detour road, and removal of existing at-grade crossing.
Further coordination effort will be needed during the PS&E phase of the project to obtain design approval and finalization of the Construction and Maintenance Agreement. 8 FUNDING
It will be a priority of OCTA to securing funds for this project. Funding may be Federal, State, or Local or a combination of each..
9 SCHEDULE
A preliminary schedule for the entire project is included as Attachment M. It is important to know that this schedule is preliminary and subject to change as the project evolves and pending construction funding. The following table provides a summary of the project milestones.
EXHIBIT 2
City Council 22 – 162 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 23
Table 6 - Project Milestone Preliminary Dates
Begin PSRE June 2011
Complete PSRE February 2012
Begin Preliminary Engineering/Environmental
Document
June 2012
Complete Preliminary
Engineering/Environmental Document
December 2014
Begin Final Design and Right of Way
Acquisition
April 2016*
Complete Final Design and Right of Way
Acquisition
April 2018*
Begin Construction September 2018*
Complete Construction June 2020*
Complete Project Close-out December 2020*
*Pending available funding
10 OTHER CONSIDERATIONS AS APPROPRIATE
10.1 Permits
The potential permits are:
x Orange County General NPDES Permit (SWPPP)
x A Regional Water Quality Control Board (RWQCB) Permit.
Cooperative Agreements and Other Agreements:
x SCRRA Construction and Maintenance Agreement.
x CPUC Construction Agreement.
10.2 Involvement with a Navigable Waterway
There is no involvement with a Navigable Waterway within the limits of this project.
10.3 Graffiti Control
The bridge and retaining wall design will include a fractured-rib finish treatment for the abutments, retaining walls, and other vertical surfaces, and this shall be constructed from the finish surface to six (6) feet above the finish surface.
In addition, the columns shall be sprayed with graffiti protection, in accordance with Caltrans specifications.
10.4 Geotechnical Investigation
A Geotechnical Technical Memorandum is included within this report as Attachment N, which provides preliminary information and recommendations for the improvements. During the next phase of the project, geotechnical investigation, testing, and preparation of the Final Geotechnical Report will occur.
EXHIBIT 2
City Council 22 – 163 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 24
11 PROJECT PERSONNEL
Jason Lee ........................................................................................................ (714) 560-5883 OCTA
Project Manager/Rail
Charles Baker .................................................................................................. (949) 724-2252 Caltrans District 12
Local Assistance
Brian Liu .......................................................................................................... (949) 724-2014 Caltrans District 12
Local Assistance
Jason Gabriel, P.E. ......................................................................................... (714) 647-5664 City of Santa Ana
Project Manager
Chuanche Ting, P.E. ........................................................................................ (714) 567-2527 AECOM Technical Services, Inc
Project Manager
Robert Matthews, P.E. ..................................................................................... (714) 567-2754 AECOM Technical Services, Inc
Structural Design Leader
Michael Arizabal .............................................................................................. (714) 567-2427 AECOM Technical Services, Inc
Traffic Design Leader
Brian Calvert .................................................................................................... (949) 333-6618 ICF International
Environmental Project Manager
EXHIBIT 2
City Council 22 – 164 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT 25
12 ATTACHMENTS
Attachment A – Highway-Rail Crossing Accident/Incident Reports Attachment B – Project Layout, Typical Section, and Profile Attachment C – Bridge General Plan
Attachment D – Pedestrian Bridge Typical Section
Attachment E – Staging and Traffic Handling
Attachment F – Shoofly
Attachment G – Right-of-Way Acquisition Map
Attachment H – Existing & Proposed Utilities
Attachment I – Cost Estimate
Attachment J – Preliminary Environmental Study (PES)
Attachment K – Categorical Exemption/Categorical Exclusion Determination Form Attachment L – Environmental Commitment Record
Attachment M – Project Schedule
Attachment N – Geotechnical Technical Memorandum
EXHIBIT 2
City Council 22 – 165 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT A
Attachment A:
Highway-Rail Crossing Accident/Incident Reports
EXHIBIT 2
City Council 22 – 166 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATK
SCAX
060087
XXX
026702V 01/25/00 06:22 PM
Amtrak [ATK ]
Southern California Regional Rail Authority
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANA WSD ORANGE 06 CA
11. City (if in a city) SANTA ANA 12. Highway Name or No. SANTA ANA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) K
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
2 0
Code
1 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
1 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
2 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
1 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
4 1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 50
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
4 23. Weather (single entry) Code
3 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
2 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN TWO
27. FRA Track
Class
5 28. Number of
Locomotive
1 29. Number of
Cars
5 30. Consist Speed
R. Recorded
(Recorded if available)
39 mph
Code
Units E. Estimated R 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
2 01 03 06 07
1. Yes
2. No
3. Unknown
35. Location of Warning
1 3
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 1 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
2 1. Male
2. Female 48
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify)
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
47. Highway Vehicle Property Damage
(est. dollar damage) $0 1
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew) 98
1. Yes 2. No
45. Was Driver in the Vehicle? Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 1
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 2
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
TRAIN 782 STRUCK A PEDESTRIAN WALKING ON TRACK GUAGE AT SANTA ANA BLVD. CROSSING IN SANTA ANA, CA.
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 167 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATK
ATSF
ATSF
112881A
311181204
311181204
026702V 11/28/81 02:20 PM
Amtrak [ATK ]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANA ORANGE 06 CA
11. City (if in a city) SANTA ANA 12. Highway Name or No. SANTA ANA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) A
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
1 30
Code
1 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
2 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
3 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
2 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 50
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
2 23. Weather (single entry) Code
1 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
2 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN
27. FRA Track
Class
3 28. Number of
Locomotive
1 29. Number of
Cars
5 30. Consist Speed
R. Recorded
(Recorded if available)
30 mph
Code
Units E. Estimated R 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
01 03
1. Yes
2. No
3. Unknown
35. Location of Warning
1 2
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 2 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
1. Male
2. Female
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown 2
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify) 1
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
2 Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
3 47. Highway Vehicle Property Damage
(est. dollar damage) $2,300 0
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew)
1. Yes 2. No
45. Was Driver in the Vehicle?
1 Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 0
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 2
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 168 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATSF
ATK
ATSF
311181204
112881A
311181204
026702V 11/28/81 02:20 PM
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
Amtrak [ATK ]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANA ORANGE 06 CA
11. City (if in a city) SANTA ANA 12. Highway Name or No. SANTA ANA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) A
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
1 35
Code
1 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
2 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
3 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
2 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 50
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
2 23. Weather (single entry) Code
1 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
2 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN
27. FRA Track
Class
3 28. Number of
Locomotive
1 29. Number of
Cars
5 30. Consist Speed
R. Recorded
(Recorded if available)
30 mph
Code
Units E. Estimated R 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
01 03
1. Yes
2. No
3. Unknown
35. Location of Warning
1 2
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 2 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
1. Male
2. Female
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown 2
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify) 1
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
2 Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
3 47. Highway Vehicle Property Damage
(est. dollar damage) $2,300 0
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew)
1. Yes 2. No
45. Was Driver in the Vehicle?
1 Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 1
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 2
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 169 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATSF
ATK
ATSF
31019102
010579A
31019102
026702V 01/05/79 09:18 AM
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
Amtrak [ATK ]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANA ORANGE 06 CA
11. City (if in a city) SANTA ANA 12. Highway Name or No. SANTA ANA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) A
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
1 25
Code
1 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
2 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
3 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
2 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 49
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
2 23. Weather (single entry) Code
2 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
2 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN TRACK
27. FRA Track
Class
2 28. Number of
Locomotive
1 29. Number of
Cars
4 30. Consist Speed
R. Recorded
(Recorded if available)
40 mph
Code
Units E. Estimated E 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
01 1. Yes
2. No
3. Unknown
35. Location of Warning
1 2
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 2 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
1. Male
2. Female
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown 2
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify) 1
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
2 Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
3 47. Highway Vehicle Property Damage
(est. dollar damage) $900 0
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew)
1. Yes 2. No
45. Was Driver in the Vehicle?
1 Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 1
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 1
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 170 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATK
ATSF
ATSF
010579A
31019102
31019102
026702V 01/05/79 09:18 AM
Amtrak [ATK ]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANNA ORANGE 06 CA
11. City (if in a city) SANTA ANNA 12. Highway Name or No. SANTA ANNA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) A
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
1 25
Code
1 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
2 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
3 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
2 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 49
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
2 23. Weather (single entry) Code
2 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
2 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN
27. FRA Track
Class
2 28. Number of
Locomotive
1 29. Number of
Cars
4 30. Consist Speed
R. Recorded
(Recorded if available)
40 mph
Code
Units E. Estimated E 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
01 1. Yes
2. No
3. Unknown
35. Location of Warning
1 2
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 2 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
1. Male
2. Female
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown 2
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify) 1
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
2 Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
3 47. Highway Vehicle Property Damage
(est. dollar damage) $900 0
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew)
1. Yes 2. No
45. Was Driver in the Vehicle?
1 Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 1
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 1
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 171 5/5/2026
1. Reporting Railroad
FEDERAL RAILROAD ADMINISTRATION (FRA)
HIGHWAY-RAIL GRADE CROSSING
ACCIDENT/INCIDENT REPORT
OMB Approval No. 2130-0500
DEPARTMENT OF TRANSPORTATION
FORM FRA F 6180.57 * NOTE THAT ALL CASUALTIES MUST BE REPORTED ON FORM FRA F 6180.55A RR Accident/Incident No.
5. Date of Accident/Incident
3. Railroad Responsible for Track Maintenance
2. Other Railroad Involved in Train Accident/Incident
3a.
2a.
4. U.S. DOT-AAR Grade Crossing ID No.
2b.
3b.
6. Time of Accident/Incident
ATSF
ATSF
31127101
31127101
026702V 12/15/77 10:10 PM
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
Atchison, Topeka & Santa Fe Rwy Co. [ATSF]
7. Nearest Railroad Station 8. Division 9. County 10. State Code SANTA ANA LOS ANGELES 06 CA
11. City (if in a city) SANTA ANA 12. Highway Name or No. SANTA ANA BLVD Public Private Highway User Involved Rail Equipment Involved
13. Type Code Code C. Truck-trailer
D. Pick-up truck
E. Van
A. Auto
B. Truck
F. Bus
G. School Bus
H. Motorcycle
J. Other Motor Vehicle
K. Pedestrian
M. Other (specify) A
17. Equipment
14. Vehicle Speed
(est. mph at impact)
1. Train
2. Train
(units pulling)
(units pushing)
1. North 2. South 3. East
3. Train
4. Car(s)
5. Car(s)
(standing)
(moving)
(standing)
6. Light loco(s)
8. Other
(moving)
7. Light loco(s) (standing)
(specify)
1 0
Code
4 15. Direction (geographical)
4. West
18. Position of Car Unit in Train
1 16. Position 1. Stalled on crossing
2. Stopped on Crossing
3. Moving over crossing
4. Trapped
Code
2 19. Circumstance 1. Rail equipment struck highway user
2. Rail equipment struck by highway user
Code
1 20a. Was the highway user and/or rail equipment involved in the impact transporting hazardous materials?
1. Highway User 2. Rail Equipment 3. Both 4. Neither
Code
4 Code
1. Highway User 2. Rail Equipment 3. Both 4. Neither
20b. Was there a hazardous materials release by
20c. State the name and quantity of the hazardous materials released, if any
21. Temperature
(specify if minus) 52
22. Visibility (single entry)
1. Dawn 2. Day 3. Dusk 4. Dark
Code
4 23. Weather (single entry) Code
1 1. Clear 2. Cloudy 3. Rain 4. Fog 5. Sleet 6. Snow
24. Type of Equipment
(single entry)
1. Freight train
2. Passenger train
3. Commuter train
4. Work train
5. Single car
6. Cut of cars
7. Yard/Switching
9. Main./inspect. car
8. Light loco(s)
A. Spec. MoW Equip.
Consist
Code
1 25. Track Type Used by Rail
Equipment Involved
1. Main 2. Yard 3. Siding 4. Industry
Code
1 26. Track Number or Name
MAIN TRACK
27. FRA Track
Class
4 28. Number of
Locomotive
4 29. Number of
Cars
83 30. Consist Speed
R. Recorded
(Recorded if available)
20 mph
Code
Units E. Estimated E 1. North 2. South 3. East
31. Time Table Direction
4. West
Code
3 32. Type of
Warning
1. Gates
2. Cantilever FLS
3. Standard FLS
4. Wig wags
5. Hwy. traffic signals
6. Audible
7. Crossbucks
9. Watchman
Crossing 8. Stop signs
10. Flagged by crew
11. Other
12. None
(specify)
Code(s)
33. Signaled Crossing 34. Whistle Ban Code
01 03
1. Yes
2. No
3. Unknown
35. Location of Warning
1 2
1. Both Sides
2. Side of Vehicle Approach
3. Opposite Side of Vehicle Approach 1. Yes 2. No 3. Unknown
36. Crossing Warning Interconnected 37. Crossing Illuminated by Street 1 Code
with Highway Signals
Code
Lights or Special Lights
1. Yes 2. No 3. Unknown
Code
38. Driver's
Age
39. Driver's Code
1. Male
2. Female
40. Driver Drove Behind or in Front of Train
and Struck or was Struck by Second Train
1. Yes 2. No 3. Unknown 2
Code
1. Drove around or thru the gate
3. Did not stop
2. Stopped and then proceeded
4. Stopped on crossing
5. Other (specify) 4
41. Driver Code
Gender
Warning
20 sec warn min (1);
42. Driver Passed Standing
Highway Vehicle
1. Yes 2. No 3. Unknown
2 Code 43. View of Track Obscured by (primary obstruction) 8 Code
1. Permanent Structure
2. Standing railroad equipment
3. Passing Train
4. Topography
5. Vegetation
6. Highway Vehicles 8. Not Obstructed
7. Other (specify)
1a.
Name Of
1b.
Alphabetic Code
Abbr.
Casualties to:
46. Highway-Rail Crossing Users
49. Railroad Employees
52. Passengers on Train
Killed Injured
44. Driver was
1. Killed 2. Injured 3. Uninjured
Code
3 47. Highway Vehicle Property Damage
(est. dollar damage) $6,000 0
0 0
0 0
0 50. Total Number of People on Train
(include passengers and crew)
1. Yes 2. No
45. Was Driver in the Vehicle?
2 Code
48. Total Number of Highway-Rail Crossing Users
(include driver) 0
51. Is a Rail Equipment Accident /
Incident Report Being Filed
1. Yes 2. No 1
Code
53a. Special Study Block 53b. Special Study Block
54. Narrative Description
55. Typed Name and Title 56. Signature 57. Date
A. Train pulling- RCL
B. Train pushing- RCL
C. Train standing- RCL
°F
EXHIBIT 2
City Council 22 – 172 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT B
Attachment B:
Project Layout, Typical Section, and Profile
EXHIBIT 2
City Council 22 – 173 5/5/2026
EXHIBIT
2 City Council 22 – 174 5/5/2026
EXHIBIT
2 City Council 22 – 175 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT C
Attachment C:
Bridge General Plan
EXHIBIT 2
City Council 22 – 176 5/5/2026
ORANGE, CA 92868-4713
999 W. TOWN AND COUNTRY ROAD
PLANS PREPARED BY:
(714) 567-2501
CITY OF SANTA ANA
GRADE SEPARATION
SANTA ANA BOULEVARD
52 53
9+00 10+00 11+00 12+00
9+00
ELEVATION
1" = 20’
DATUM Elev XXX.X
10+00 11+00 12+00
BB
61’-10"
251’-9" MEASURED ALONG BRIDGE
61’-10" 61’-10" 66’-3"
EB
MAX
2:1
T/R UTILITY CORRIDOR
VERT CLR
16’-6" MIN
BARRIER
TYPE 60D
CAR CORRIDOR
BIKE LANE & STREET
FUTURE CLASS I
TYP
BENT
ROADWAY ROADWAY
FG
ABUT 1 BENT 2 BENT 3 BENT 4 ABUT 5
MEDIAN
1 3
4 RAILING (TYP)
TYP
(BETWEEN CIDH PILES)
RET WALL TIEBACKS
2 3
PILE (TYP)
6’-0" CIDH
NOTE: ELEVATION IS SHOWN LOOKING WEST.
FASCIA GIRDER
STEEL BEAM/
TYPICAL SECTION
3/16" = 1’-0"
BRIDGE
40’-10"
20’-5" 20’-5"
21’-10"– MAX TO 17’-10"– MIN
9’-6" MIN VARIES 9’-6" MIN
ENVELOPE (TYP)
CLEARANCE
TRACK 1
METROLINK
TRACK 2
METROLINK
COLUMN (TYP)
6’-0" `
TYP
STEEL BEAM
8’-0"
T/R
TYP
RAILING
60’– OCTA R/W
TIE
TYP
GIRDER WITH WALKWAY
DECORATIVE FASCIA
ARCHITECTURAL
CURB (TYP)
CONCRETE
8’ 12’ 11’ 12’ 15’
12’ 11’ 12’
60’–
20’
9’
Sta 52+37.44 E. SANTA ANA BLVD
Sta 10+89.50 BRIDGE
EB Sta 11+55.75
BB Sta 9+04.00
TRACK 1
METROLINK
TRACK 2
METROLINK
E. SANTA
ANA
BLVD
BRIDGE
SKEW (TYP)
MEDIAN
1" = 20’
PLAN
OCTA
R/W
PEDESTRIAN BRIDGE
PEDESTRIAN BRIDGE
OCTA R/W
OCTA R/W
GENERAL PLAN
LEGEND:
1 2
4 SW
SHOOFLY TRACKS NOT TO SCALE.
NOTE:
SHOOFLY TRACK #1 SHOOFLY TRACK #2
3 DIRECTION OF TRAFFIC
POINT OF MINIMUM VERTICAL CLEARANCE
CABLE RAILING
SIDEWALK
RETAINING WALL #2
RETAINING WALL #1
1 2
TOE OF SLOPE
TOP OF SLOPE
CORRIDOR
UTILITY
SW
EXHIBIT 2
City Council 22 – 177 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT D
Attachment D:
Pedestrian Bridge Typical Section
EXHIBIT 2
City Council 22 – 178 5/5/2026
TYPICAL SECTION
3/16" = 1’-0"
BRIDGE
40’-10"
20’-5" 20’-5"
21’-10"– MAX TO 17’-10"– MIN
VARIES
ENVELOPE (TYP)
CLEARANCE
TRACK 1
METROLINK
TRACK 2
METROLINK
COLUMN (TYP)
6’-0" `
TYP
STEEL BEAM
8’-0"
T/R TYP
RAILING
60’– OCTA R/W
TIE
30’-0" MIN & VARIES 30’-0" MIN & VARIES
BRIDGE
PEDESTRIAN
BRIDGE
PEDESTRIAN
-2% -2%
TYP
12’-0"
TYP
10’-0"
MIN
VERT CL
R, TYP
20’-6"
CURB (TYP)
12" HIGH
TYP
3’-0"
CONCRETE BOX GIRDER (TYP)
PRECAST/PRESTRESSED
UTILITY (TYP)
FUTURE
TYP
3" AC OVERLAY
TYP
METAL RAILING
TYP
PROFILE GRADE
COLUMN (TYP)
4’-0" `
MIN
VERT CL
R
16’-6"
ROADWAY
ORANGE, CA 92868-4713
999 W. TOWN AND COUNTRY ROAD
PLANS PREPARED BY:
(714) 567-2501
CITY OF SANTA ANA
GRADE SEPARATION
SANTA ANA BOULEVARD
TYPICAL SECTION
EXHIBIT 2
City Council 22 – 179 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT E
Attachment E:
Staging and Traffic Handling
EXHIBIT 2
City Council 22 – 180 5/5/2026
EXHIBIT 2
City Council 22 – 181 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT F
Attachment F:
Shoofly
EXHIBIT 2
City Council 22 – 182 5/5/2026
EXHIBIT
2 City Council 22 – 183 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT G
Attachment G:
Right-of-Way Acquisition Map
EXHIBIT 2
City Council 22 – 184 5/5/2026
EXHIBIT
2 City Council 22 – 185 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT H
Attachment H:
Existing & Proposed Utilities
EXHIBIT 2
City Council 22 – 186 5/5/2026
EXHIBIT
2 City Council 22 – 187 5/5/2026
EXHIBIT
2 City Council 22 – 188 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT I
Attachment I:
Cost Estimate
EXHIBIT 2
City Council 22 – 189 5/5/2026
City of Santa Ana
Santa Ana Boulevard Grade Separation Project
Preliminary Engineering Estimate
9/15/2014
No. Item Description Unit of
Measure Unit Cost Quantity Item Total
1 Mobilization (10%) LS $ 3,274,000 1 $ 3,274,000
2 Clearing and Grubbing LS $ 200,000 1 $ 200,000
3 Demolition LS $ 1,500,000 1 $ 1,500,000
4 Roadway Excavation CY $ 13 98,000 $ 1,274,000
5 Hot Mix Asphalt (HMA) TON $ 85 9,100 $ 773,500
6 Class 2 Aggregate Base CY $ 40 7,300 $ 292,000
7 PCC Curb & Gutter LF $ 25 6,100 $ 152,500
8 PCC Sidewalk SF $ 5 34,600 $ 173,000
9 Retaining Wall SF $ 70 26,500 $ 1,855,000
10 Retaining Wall (Raised Sidewalk) SF $ 70 3,470 $ 242,900 11 Underpass Structural LS $ 7,851,415 1 $ 7,851,415
12 Pedestrian Bridge SF $ 190 5,040 $ 957,600
13 Storm Drain System LS $ 350,000 1 $ 350,000
14 Pump Station LS $ 1,500,000 1 $ 1,500,000
15 Utility Relocation LS $ 2,500,000 1 $ 2,500,000
16 Street Lighting LS $ 300,000 1 $ 300,000
17 Railroad Shoofly TF $ 450 5,850 $ 2,632,500
18 Railroad Grade Crossing Work LS $ 1,600,000 1 $ 1,600,000 19 Temporary Railroad Station LS $ 2,688,000 1 $ 2,688,000 20 Permanent Railroad Station LS $ 640,000 1 $ 640,000
21 Rail Road Signal & Communication LS $ 2,500,000 1 $ 2,500,000 22 PTC LS $ 1,000,000 1 $ 1,000,000
23 Signing & Striping LS $ 50,000 1 $ 50,000
24 Detour Road & Traffic Control LS $ 1,000,000 1 $ 1,000,000 25 Signal Modification/Queue Cutter Signal EA $ 300,000 1 $ 300,000 26 Landscape LS $ 150,000 1 $ 150,000
27 Irrigation LS $ 150,000 1 $ 150,000
28 SWPPP and Implementation LS $ 100,000 1 $ 100,000
$ 36,007,000
$ 9,001,750
$ 45,008,750
Subtotal:
25 % Contingency:
Construction Total:
1 EXHIBIT 2
City Council 22 – 190 5/5/2026
City of Santa Ana
Santa Ana Boulevard Grade Separation Project
Preliminary Engineering Estimate
9/15/2014
No. Item Description Unit of
Measure Unit Cost Quantity Item Total
Engineering:
29 Final PS&E Design (10%) LS $ 4,500,875 1 $ 4,500,875 30 Construction Engineering (15%) LS $ 6,751,313 1 $ 6,751,313 $ 11,252,188
Right of Way:
31 Right of Way Acquisition LS $ 12,460,486 1 $ 12,460,486 $ 12,460,486
$ 3,115,122
$ 15,575,608
32 Right of Way Consultant Support LS $ 1,500,000 1 $ 1,500,000 $ 73,336,546
Engineering Total:
Total Project Cost (not including PA/ED):
25 % Contingency:
Subtotal:
Right of Way Total:
2 EXHIBIT 2
City Council 22 – 191 5/5/2026
Santa Ana Blvd. Grade Separation
PROJECT REPORT EQUIVALENT J
Attachment J:
Preliminary Environmental Study (PES)
EXHIBIT 2
City Council 22 – 192 5/5/2026
Local Assistance Procedures Manual Exhibit 6-A
Preliminary Environmental Study (PES) Form